&EPA
United States
Environmental Protection
Agency
      Envirogen Propane
      Biostimulation Technology for
      In-Situ Treatment of MTBE-
      Contaminated Ground Water

      Innovative Technology
      Evaluation Report

-------
                                                   EPA/600/R-02/092
                                                    November 2002
Envirogen Propane Biostimulation Technology
                            for
  In-Situ Treatment of MTBE-Contaminated
                    Ground Water

     Innovative Technology Evaluation Report
                           Prepared by:

                       Technical Project Manager

                        Ann Azadpour-Keeley
                Subsurface Protection and Remediation Division
                National Risk Management Research Laboratory
                    Office of Research and Development
                   U.S. Environmental Protection Agency
                          Ada, OK 74820
                National Risk Management Research Laboratory
                    Office of Research and Development
                   U.S. Environmental Protection Agency
                        Cincinnati, Ohio 45268

-------
                                               NOTICE

The U.S. Environmental Protection Agency (EPA) through its Office of Research and Development funded the
information described here by Ann Keeley, the EPA TPM and WAM for this demonstration, under contract 68-C-
98-138 to ManTech Environmental Research Services Corp. and 68-C-00-179 to SAIC.  It has been subjected to the
Agency's peer and administrative review and has been approved for publication as an EPA document. Mention of
trade names or commercial products does not constitute an endorsement or recommendation for use.

All research projects making conclusions or recommendations based on environmental data funded by the U.S.
Environmental Protection Agency are required to participate in the Agency Quality Assurance Program. This project
was conducted under an approved Quality Assurance Project Plan. The procedures specified in this plan were used
without exception.  Information on the plan and documentation of the quality assurance activities and results are
available from the principal Investigator.

-------
                                             FOREWORD

The U.S. Environmental Agency (EPA) is charged by Congress with protecting the nation's land, air, and water
resources. Under a mandate of national environmental laws, the Agency strives to formulate and implement actions
leading to a compatible balance between human activities and the ability of natural systems to nurture life. To meet
this mandate, EPA's research program is providing data and technical support for solving environmental problems
today and building a science knowledge base necessary to manage our ecological resources wisely, understand how
pollutants affect our health, and prevent or reduce environmental risks in the future.

The National Risk Management Research  Laboratory is the Agency's  center for investigation of technological and
management approaches for reducing risks from threats to human health and the environment.  The focus of the
Laboratory's research program is on methods for the prevention and control of pollution to air, land, water and
subsurface resources; protection of water quality in public water systems; remediation of contaminated sites and
ground water; and prevention and control of indoor air pollution.  The goal of this research effort is to catalyze
development  and implementation of innovative, cost-effective environmental technologies; develop scientific and
engineering information needed by EPA to support regulatory and policy decisions; and provide technical support
and information transfer to ensure effective implementation of environmental regulations and strategies.

The purpose of this publication is to present information that will  assist decision-makers in evaluating an innovative
remedial technology for application to cleanup of sites with contaminated ground water.  This ITER, which has been
produced as part of the Laboratory's strategic long-term research plan, describes the effectiveness and applicability
of the propane biostimulation technology developed by Envirogen as a potential in-situ remedial alternative for the
mineralization of MTBE from contaminated ground water. This technology was demonstrated and evaluated at the
Naval Base Ventura County at Port Hueneme, California.  Spatial and temporal data to evaluate the technology were
collected from a dense network of in-situ monitoring points over a period in excess of 300 days.  This comprehensive
evaluation of the Envirogen technology demonstrated that its application at this site did not meet the State of
California's treatability criteria.
                                                 Stephen G. Schmelling, Acting Director
                                                 Subsurface Protection and Remediation Division
                                                 National Risk Management Research Laboratory
                                                    in

-------
                                         ABSTRACT

The primary objective of the Biostimulation Technology Evaluation was to determine if enhanced
biodegradation was occurring in a ground-water Test Plot to a sufficient degree to reduce intrinsic methyl
tertiary butyl ether (MTBE) to the State of California's treatability criteria of 5 |ig/L or below. The
project was carried out at the National Environmental Technology Test Site (NETTS) at the (NBVC)
Naval Base Ventura County, Port Hueneme, California where a hydrocarbon release into ground water
occurred between September 1984 and March 1985 involving approximately 4,000 gallons of leaded and
6,800 gallons of unleaded premium gasoline.

The geology at the site consists of unconsolidated sediments composed of sands, silts, clays and minor
amounts of gravel and fill material. A shallow, perched, unconfined aquifer is the uppermost water-
bearing unit. The water table is generally encountered at depths between 6 to 8 feet below ground
surface (BGS), and has a saturated aquifer thickness of 16 to 18 feet.

The evaluation was carried out between June  2001 and March 2002 using Control and Test Plots and a
cadre of primary and secondary analytes through 15  sampling events. The goals of the project were
approached with the use of deuterated MTBE (d-MTBE) and ground-water tracers including bromide and
iodide.

An analysis of intrinsic MTBE, deuterated MTBE, daughter products, and geochemical parameters
demonstrated that the technology did not meet the State of California's treatability criteria.
                                              IV

-------
                             TABLE OF CONTENTS
Section
Pas
NOTICE	ii
FOREWORD	iii
ABSTACT	iv
LIST OF FIGURES	viii
LIST OF TABLES	ix
ACRONYMS, ABBREVIATIONS, AND SYMBOLS	x
ACKNOWLEDGEMENTS	xiii

EXECUTIVE SUMMARY	 1

SECTION 1   INTRODUCTION	5

            1.1  PURPOSE AND ORGANIZATION OF THE ITER	5
            1.2  DESCRIPTION OF THE MTBE DEMONSTRATION PROGRAM	6
            1.3  TECHNOLOGY DESCRIPTION	7
                  1.3.1  Principles of the Propane Biostimulation Technology	7
                  1.3.2  Demonstration System Design	11
            1.4  KEY CONTACTS	13

SECTION 2   DEMONSTRATION OBJECTIVE AND EVALUATION JUSTIFICATION	15

            2.1  BACKGROUND	15
                  2.1.1  NBVC Site Characterization	16
                  2.1.2  Site Description	 16
                  2.1.3  Hydrogeology	 16
                  2.1.4  Contaminant Distribution	17
            2.2  TECHNOLOGY DEMONSTRATION SITE PRE-CHARACTERIZATION	17
            2.3  DEMONSTRATION OBJECTIVE	 19
                  2.3.1  Primary Objective - A Critical Measurement	21
                  2.3.2  Secondary Objectives -Non-Critical Measurements	22
           2.4  SCHEDULE	28

SECTION 3   PERFORMANCE MONITORING APPROACH	30

            3.1  TRACER STUDY COMPOUNDS	30
                  3.1.1  Test and Control Design	35
                  3.1.2  Monitoring Parameters	36
                  3.1.3  Sampling Approach	36

SECTION 4   SAMPLING AND ANALYSIS PROTOCOL	38

            4.1  GROUND-WATER SAMPLING	38

                  4.1.1  Monitoring Well Specifications	 38
                  4.1.2  Low Flow Sampling 	38

-------
            4.2
           TABLES OF CONTENTS (Continued)

  4.1.3  Well Purging	39
  4.1.4  Well Sampling 	39
TRACER INJECTION SYSTEM OPERATION AND MAINTENANCE	41
SECTION 5   PRE-DEMONSTRATION INVESTIGATION	45

             5.1  BROMIDE TRACER TEST	45

SECTION 6    TREATMENT EFFECTIVENESS - RESULTS	49

            6.1  DEMONSTRATION OBJECTIVES AND APPROACH	49
            6.2  DEMONSTRATION PROCEDURES	49
                   6.2.1   MTBE Reduction	50
                   6.2.2   d-MTBE Reduction	54
                   6.2.3   Daughter Products	59
                   6.2.4   Water Quality Measurements	62
            6.3  WATER LEVEL MEASUREMENTS	64

SECTION 7   TREATMENT EFFECTIVENESS - CONCLUSIONS	71

            7.1  BACKGROUND	71
            7.2  PERFORMANCE ANALYSIS	72
                   7.2.1  Qualified Monitoring Points	73
                   7.2.2  Statistical Analysis of Results	74
            7.3  EVALUATION OF RESULTS AGAINST OBJECTIVE	85
            7.4  QUALITY ASSURANCE AND QUALITY CONTROL RESULTS	89

SECTIONS   ECONOMIC ANALYSIS	94

            8.1   INTRODUCTION	94
            8.2   APPLICATION ISSUES AND ASSUMPTIONS	95
                   8.2.1  Site-Specific Factors	97
                   8.2.2  Equipment and Operating Parameters	97
                   8.2.3  Base-Case Scenario	99
            8.3  COST CATEGORIES	100
                   8.3.1   Site Preparation Costs	100
                   8.3.2   Permitting and Regulatory Costs	 101
                   8.3.3   Mobilization and Startup Costs	102
                   8.3.4   Equipment Costs	 103
                   8.3.5   Labor Costs	103
                   8.3.6   Supply Costs	104
                   8.3.7   Utility Costs	104
                   8.3.8   Effluent Treatment and Disposal Costs	 105
                   8.3.9   Residual Waste Shipping and Handling Costs	105
                   8.3.10  Analytical Services Costs	105
                   8.3.11  Equipment Maintenance Costs	106
                   8.3.12  Site Demobilization Costs	106

                                       vi

-------
                      TABLES OF CONTENTS (Continued)

           8.4  CONCLUSIONS OF ECONOMIC ANALYSIS	106

SECTION 9   TECHNOLOGY APPLICATIONS ANALYSIS	108

           9.1  TECHNOLOGY PERFORMANCE VERSUS ARARS	108
           9.2  TECHNOLOGY OPERABILITY	109
           9.3  KEY FEATURES OF THE TREATMENT TECHNOLOGY	 110
           9.4  APPLICABLE WASTES	 110
           9.5  AVAILABILITY AND TRANSPORTABILITY OF EQUIPMENT	 Ill
           9.6  MATERIALS HANDLING REQUIREMENTS	Ill
           9.7  RANGE OF SUITABLE SITE CHARACTERISTICS	Ill
                 9.7.1   Site Support Requirements	 112
           9.8  LIMITATIONS OF THE TECHNOLOGY	 112
           9.9  POTENTIAL REGULATORY REQUIREMENTS	 113

SECTION 10  TECHNOLOGY STATUS	119

           10.1 PREVIOUS EXPERIENCE	 119
           10.2 SCALING CAPABILITIES	120

REFERENCES	 121

APPENDIX A VENDOR'S CLAIMS	A-l
                                   Vll

-------
                                        List of Figures
Number                                                                                Page

1-1    PortHueneme Plume Map	8
1-2    Site Location	9
1-3    In-Situ Application of Propane Biostimulation	10
1-4    Piping and Instrumentation Diagram	 14
3-1    Test and Control Plots Layout	32
3-2    Tracer Circulation Well	33
3-3    Tracer Circulation System Cross Section	34
3-4    Well Construction Specifications	37
6-1    MTBE Concentration in the Vicinity of the Envirogen Site on October 4,2000	50
6-2    MTBE Concentration in the Vicinity of the Envirogen Site on November 11, 2000	51
6-3    The Average Deep Screen MTBE Concentrations in the Test and Control Plots	52
6-4    MTBE by Flow Paths (Columns) in Test Plot	53
6-5    MTBE by Flow Paths (Columns) in Control Plot	54
6-6    d-MTBE in Downgradient Columns of Test Plot	56
6-7    d-MTBE in Downgradient Columns of Control Plot	56
6-8    Downgradient d-MTBE Concentration in Control and Test Plots	59
6-9    Static Water Levels in Test Plot	66
6-10   Maximum Water Levels in Test Plot	67
6-11   Static Water Levels in Control Plot	68
6-12   Maximum Water Levels in Control Plot	69
6-13   Pictures of Water Spouts at the Surface Through Monitoring Wells	70
7-1    Test Plot Normal Distribution	79
7-2    Control Plot Normal Distribution	80
7-3    Probability Plot MTBE in Test Plot	81
7-4    Probability Plot MTBE in Control Plot	82
7-5    MTBE Time Trends for Test and Control Plots	83
7-6    Time Trends of Total d-MTBE Mass in Test and Control Plots	84
7-7    Downgradient Test Plot MTBE Concentrations at the Bottom Screens	86
                                             Vlll

-------
                                        List of Tables
Number                                                                                Page

2-1    Summary of Site Characterization Analytical Results for Contaminants of
       Concern at the Middle Zone	25
2-2    Analyses to Support the Propane Biostimulation and Bioaugmentation
       Project Objectives	26
2-3    Applicable Regulatory Criteria for MTBE Treatment Technology
       Demonstration Program	27

2-4    U.S. EPA Performance Monitoring Sampling Schedule	29

4-1    Analytical Parameters and Method Requirements	44

5-1    Initial Breakthrough Periods for Downgradient Observation Points	47

6-1    Detection of d-MTBE in Upgradient Monitoring Wells	58

6-2    Daughter Products in  Control Plot	61

6-3    Daughter Products in  Test Plot	61

6-4    Water Quality Measurements in Control Plot	63

6-5    Water Quality Measurements in Test Plot	63

7-1    Qualified Monitoring Wells	75

8-1    Estimated Cost for Envirogen Propane Biostimulation and Bioaugmentation
       Project at a Typical Gas Station	96
                                              IX

-------
                     ACRONYMS, ABBREVIATIONS, AND SYMBOLS
ALSI         Analytical Laboratory Services, Inc.
ARAR        Applicable or relevant and appropriate requirement
BIPT         Bacterial injection point in the Test Plot
Br"           Bromide ion
BGS          Below ground surface
BTEX        Benzene, toluene, ethylbenzene, and xylenes
CAA         Clean Air Act
CERCLA      Comprehensive Emergency Response, Compensation, and Liability Act
CFR          Code of Federal Regulations
CPU          Colony Forming Units
Cl"           Chloride ion
CO2          Carbon dioxide
COC         Chain-of-Custody
CPT          Cone Penetrometer Technology
CWA         Clean Water Act
DBPR        Disinfection By-Product Rule
DO           Dissolved oxygen
DOC         Dissolved organic carbon
DOE         Department of Energy
d-MTBE      Deuterated methyl tert-butyl ether
EPA          U.S. Environmental Protection Agency
ITER         Innovative Technology Evaluation Report
LCS/LCSD    Laboratory control  samples and laboratory control sample duplicates
MCL/MCLG   Maximum Contaminant Level and Maximum Contaminant Level Goal
MDL         Method detection limit
l-ig/L          Microgram per liter
mg/L         Milligram per liter
MS/MSD      Matrix spike/matrix spike duplicate
MTBE        Methyl tert-butyl ether
NAAQS       National Ambient Air Quality Standard
NETTS       Department of Defense National Environmental Technology Test Site

-------
               ACRONYMS, ABBREVIATIONS, AND SYMBOLS (Continued)

NBVC        Naval Base Ventura County
NEX          Naval Exchange
NFESC       Naval Facilities Engineering Service Center
NRMRL       National Risk Management Research Laboratory
OIPC         Oxygen injection point in the Control Plot
OIPT         Oxygen injection point in the Test Plot
OSWER       Office of Solid Waste and Emergency Response
PIPT          Propane injection point in the Test Plot
PMO         Propane monooxygenase
POB          Propane oxidizing bacteria
ppm          Part per million
PQA          Pre-Quality Assurance Project Plan  Agreement
QA           Quality assurance
QAPP         Quality assurance project plan
QC           Quality control
RCRA        Resource Conservation and Recovery Act
RRF          Relative response factor
RPD          Relative percent difference
SAIC         Science Applications International Corporation
SDWA        Safe Drinking Water Act
SPRD         Subsurface Protection and Remediation Division
STDEV       Standard Deviation
SVE          Soil vacuum extraction
SVOC        Semi-volatile organic compound
TEA          fert-butyl alcohol
TCE          Trichloroethene
TPM          Technical Project Manager
TOC          Total organic carbon
TSCA         Toxic Substance Control Act
TSA          Technical system audit
                                            XI

-------
               ACRONYMS, ABBREVIATIONS, AND SYMBOLS (Continued)
UCL         Upper confidence limit
VMP         Vapor monitoring point
VOA         Volatile organic analysis
VOC         Volatile organic compound
WAM        Work Assignment Manager
WQCB       Water Quality Control Board
WQS         Water quality standard
                                          Xll

-------
                                  ACKNOWLEDGMENTS

This report was prepared for the U.S. Environmental Protection Agency (EPA) by Ann Keeley, the EPA
Technical Project Manager and Work Assignment Manager for this demonstration, at the National Risk
Management Research Laboratory (NRMRL) in Ada, Oklahoma.  The technology evaluation process was
a cooperative effort that involved personnel from the EPA Office of Research and Development (ORD),
EPA Region 9, U.S. Navy, California Water Quality Control Board (WQCB), and Envirogen.

The extensive effort of the following personnel during this project is gratefully acknowledged:
           •   Fran Kremer, Annette Gatchett, Bob Olexsey, and Steve Schmelling of NRMRL and
              Arlene Kabei of Region 9 for the composition of an outstanding management team for
              the overall MTBE demonstration evaluation program;
           •   The NRMRL QA Managers Ann Vega and Steve  Vandegrift for their crucial roles in
              association with the various aspects of the quality assurance and quality control of this
              demonstration;
           •   Drs. Carl Enfield, John Wilson, and Randall Ross for their technical advice;
           •   Peter Raftery as well as the WQCB management for their technical and administrative
              efforts in granting the project permits;
           •   ManTech, a SPRD  contractor for performing various tasks including system installation,
              sampling execution, and laboratory analytical services; and
           •   SAIC, a NRMRL contractor for the development of the project QAPP.

Special thanks are offered to the employees at the U.S. Navy, Naval Facilities Engineering Service
Center (NFESC) host site for their hospitality and assistance throughout this demonstration, especially,
Ernie Lory, Dorothy Cannon,  and James Osgood.
                                             Xlll

-------
                                  EXECUTIVE SUMMARY

The primary objective of the Biostimulation Technology Evaluation was to determine if biodegradation
was occurring in a ground-water Test Plot to a sufficient degree to reduce intrinsic MTBE to the State of
California's treatability criteria of 5 |ig/L or below.  The evaluation was carried out using Control and
Test Plots and a cadre of primary and secondary analytes through 15 sampling events over a 38-week test
period. An analysis of intrinsic MTBE, deuterated MTBE, daughter products, and geochemical
parameters  demonstrated that the technology did not meet the State of California's treatability criteria.

The National Environmental Technology Test Site (NETTS) at the (NBVC) Naval Base Ventura County,
Port Hueneme, California is the site of a hydrocarbon release into ground water (Everett et al., 1998)
between September 1984 and March 1985 involving, according to inventory records, approximately 4,000
gallons of leaded and 6,800 gallons of unleaded premium gasoline. The resulting ground-water plume
consists of approximately 9 acres of BTEX and approximately 36 additional acres of methyl tertiary butyl
ether (MTBE) contamination, extending approximately 4,500 feet downgradient from the site of the
release.  The Port Hueneme NETTS facility is located approximately 40 miles northwest of Los Angeles.

The geology at the site consists of unconsolidated sediments composed of sands, silts, clays and minor
amounts of gravel and fill material. A shallow, perched, unconfined aquifer is the uppermost water-
bearing unit. The shallow aquifer is comprised of three depositional units: an upper silty-sand, an
underlying fine- to coarse grained sand and a basal clay layer.  Based on CPT pushes, the  upper silty-sand
unit ranges  between 8 to 10 feet thick and the underlying sand is approximately 12 to 15 feet thick.  The
water table  is generally encountered at depths between 6 to 8 feet below ground surface (BGS), with
seasonal fluctuations  ranging between 1 and 2 feet, yielding a saturated aquifer thickness  of 16 to 18 feet
near the test area.

Methyl fert-butyl ether (MTBE) has become the most widely used automobile fuel oxygenate (Gullick
and leChevallier, 2002). As a consequence of fuel spills and leaking storage tanks, MTBE has become a
ubiquitous and recalcitrant ground-water contaminant (Pankow et al., 1997; Rice et al., 1995; Reuter et
al., 1998).

In an attempt to demonstrate ground-water remedial alternatives for MTBE, the U.S. Environmental
Protection Agency (EPA) and the U.S. Navy entered into a memorandum of understanding (MOU) to
conduct a demonstration of a treatment technology for MTBE in ground water. Technology vendors were

-------
chosen through an open solicitation requesting proposals for processes to treat MTBE. Proposals were
then selected using external and internal peer review.  Envirogen was selected to demonstrate their
propane biostimulation barrier technology as a mechanism to inhibit the migration of MTBE through
ground water.  The potential remedial action proposes the stimulation of cometabolism by the injection of
oxygen and propane into the aquifer along with MTBE degrading bacteria.

Project objectives were addressed through the establishment of treatment and control plots, a network of
conventional upgradient and downgradient monitoring points in the aquifer and vadose zone, and a
ground-water tracer mixing and injection system. The treatment plot received the vendor's biostimulation
technology consisting of oxygen, propane, and bacterial amendments.  The control plot received only
oxygen.

The goals of the project were multifaceted with the end result being the determination of the efficacy of
using propane and/or oxygen biostimulation and bioaugmentation as a potential remedial alternative for
the removal  of MTBE from ground water.  Achieving these objectives was approached with the use of
deuterated MTBE (d-MTBE) and ground-water tracers including bromide and iodide.  The ratios of
ground-water tracers between downgradient transects were designed to provide evidence concerning the
relative losses in MTBE concentrations resulting from dilution and degradation.  Likewise,  the use of d-
MTBE ratios in downgradient transects served as a tracer of anthropogenic MTBE.  More importantly,
the use of d-MTBE was selected to provide evidence of biodegradation by the realization of d-MTBE
daughter products.

Bromide was used in a preliminary study to determine the velocity as well as the distribution of ground-
water flow, and the degree of communication between the tracer injection system and each of the
downgradient monitoring locations. Bromide injection was started on February 1, 2001, and was stopped
on February 28, 2001. Monitoring continued in order to observe the return of bromide to background
concentrations.

Based on the results of the pre-demonstration bromide tracer study, the final project plan was developed
concerning the application rate of conservative and non-conservative tracers from the injection wells, and
called for 15 sampling events rather than the original 7 because it was determined that little ground-water
flow was taking place in other than the bottom portion of the aquifer. Periodic samples were taken from
the middle and upper monitoring screens, however, to assure that flow remained predominantly at the
bottom of the aquifer through the evaluation period.

-------
During the latter part of May 2001, the performance evaluation phase of the project was begun with the
addition of amendments of oxygen, propane, and bacteria. The injection of iodide started on June 8,
2001. Iodide was selected for use in this phase of the project because of its low level of detection and to
avoid possible problems associated with residual bromide concentrations. The first sampling event took
place on June 14, 2001.

Some significant observations were made concerning the period during the pre-characterization
investigation, beginning in late 2000, up to the beginning of the evaluation period in June 2001.  For
example, the overall intrinsic MTBE concentration in the vicinity of the plots dropped about 500 |ig/L
between October 4 and November 11, 2000, and MTBE concentrations in the Control Plot were
significantly higher than those in the Test Plot.  Most significantly, MTBE concentrations in the
downgradient Test Plot dropped from over 5,000 |ig/L in January 2001 to less than 1,000 |ig/L by the first
sampling event in June. This meant the remediation technology had to be effective in reducing the MTBE
concentration from less than 1,000 |lg/L to 5 |lg/L or below rather than starting with a MTBE
concentration of over 5,000 |lg/L.

During the 38-week period between June  14, 2001, and March 8, 2002, 15 sampling events took  place,
occurring biweekly for the first ten events and monthly thereafter.  Although sampling was concentrated
at the bottom well screens, the middle and upper screens were sampled periodically at each well  location.
In the Test Plot the sampling locations included 6 upgradient wells, 14 downgradient wells, and  19
injection wells.  The Control Plot consisted of 4 upgradient wells,  10 downgradient wells, and 19
injection wells.

In addition to the primary parameters of MTBE, d-MTBE, and iodide, samples were also analyzed for
appropriate secondary parameters in order to test for both MTBE and d-MTBE daughter products as well
as changes in geochemistry.  Following the evaluation period it was determined that geochemical
parameters in the upgradient and downgradient Test and Control Plots were unchanged. There was no
evidence of increases in alkalinity in the downgradient Test Plot as would be expected, nutrients were not
reduced, and most importantly, the total and dissolved organic carbon (electron donors) were not reduced.

The daughter products which were analyzed included: acetone; acetone-d6; 2-propanol; 2-propanol-
d6,d8; formaldehyde; tert-butyl alcohol; and fert-butyl alcohol-d9,dlO. Very low levels of daughter
products were detected in both the Test and Control Plots. While only TEA was detected at the

-------
upgradient wells, both d-TBA and TEA were detected in the downgradient wells.  It was not determined
whether biotic or abiotic processes produced these products.

The d-MTBE in both the Test and Control Plots increased throughout the evaluation period. Although the
concentrations were slightly higher in the Control Plot because of its higher hydraulic conductivity, the
increase in both Plots was the same as determined by a least squares fit of the data.

The intrinsic MTBE concentrations in the upgradient Test Plot and both upgradient and downgradient
portions of the control Plot decreased gradually through the evaluation period.  In the downgradient Test
Plot, the most significant site of the evaluation, the data remained between 300 - 600 |ig/L with a small
positive slope as determined by a least squares calculation.

-------
                                          SECTION 1
                                      INTRODUCTION

The Envirogen propane biostimulation technology (the technology) was demonstrated for the treatment of
ground water contaminated with methyl fert-butyl ether (MTBE) over a 300-day period at the Department
of Defense National Environmental Technology Test Site (NETTS) at the Naval Base Ventura County
(NBVC) at Port Hueneme, California. This Innovative Technology Evaluation Report (ITER) describes
the results of that demonstration and provides other pertinent technical and cost information for potential
users of this technology. For additional information about this technology, and the evaluation, refer to
key contacts listed at the end of this section.

1.1     PURPOSES AND ORGANIZATION OF THE ITER

Information presented in the ITER is intended to assist decision makers in evaluating specific
technologies for a particular cleanup situation. The ITER represents a critical step in the development
and commercialization of a treatment technology. The report discusses the effectiveness and applicability
of the technology and analyzes costs associated with its application.  The technology's effectiveness is
evaluated based on data collected during the demonstration.  The applicability of the technology is
discussed in terms of waste and site characteristics that could affect technology performance, material
handling requirements, technology limitations, and other factors.

The purpose of this ITER is to present information that will assist decision makers in evaluating the
Envirogen propane biostimulation technology for application to a particular site cleanup. This report
provides background information and  introduces the propane biostimulation technology (Section 1.0),
provides an overview of demonstration objective and evaluation justification of the technology
demonstration at the NBVC (Section 2.0), describes performance monitoring  approach and sampling and
analysis protocol (Sections 3.0 and 4.0), provides an overview of pre-demonstration tracer test (Section
5.0), analyzes the technology's applications (Sections 6.0 and 7.0), analyzes the economics of using the
propane biostimulation technology to treat contaminated ground water (Section 8.0), summarizes the
technology's applications analysis (Section 9.0), describes the technology's status (Section 10), and
presents a list of references used to prepare the ITER. Vendor's claims  for the propane biostimulation
technology are presented in Appendix A.

-------
1.2    DESCRIPTION OF THE MTBE DEMONSTRATION PROGRAM

In 1999, the U.S. Environmental Protection Agency (EPA) and the U.S. Navy entered into a
memorandum of understanding to conduct a multi-year program involving demonstration and evaluation
of several innovative technologies for the treatment of MTBE in ground water. Technology vendors were
identified through an open solicitation requesting proposals for processes to treat MTBE. Vendors
participating in the program were selected based on the results of external and internal EPA/Navy peer
review processes.

The site that was selected through an open solicitation to host the multiple-vendor MTBE demonstration
program was the Department of Defense National Environmental Technology Test Site (NETTS) at the
Naval Base Ventura County (NBVC) at Port Hueneme, California.  The Port Hueneme NETTS facility is
located approximately 40 miles northwest of Los Angeles. The Naval Exchange (NEX) service station is
the source of the petroleum plume that occurs at the Port Hueneme NBVC facility. The NEX service
station site is typical of similar gasoline service station sites throughout the country, where leaking
gasoline storage tanks and product delivery lines have contaminated surrounding ground water with
gasoline compounds and additives, including MTBE (Kostecki et al., 1997).   According to NEX
inventory records, approximately 4,000 gallons of leaded and 6,800 gallons of unleaded premium
gasoline were released from the distribution lines between September 1984 and March 1985. The MTBE
plume that emanates from the NEX service station at the NBVC site extends approximately 4,500 feet
from the contamination source in a shallow perched aquifer.

Three locations within the MTBE plume at the NEX service station site were identified as potential
locations for technology demonstrations.  These three locations are differentiated by their distance from
the source and are identified as follows:

       1.      The Source Zone: This zone  is located within the immediate vicinity of the source and is
               characterized by having a high concentration of MTBE as well as benzene, toluene,
               ethylbenzene, and xylenes (BTEX), and potentially contains free-phase gasoline.
       2.      The Middle Zone: This zone is the area mid-way downgradient along the MTBE plume
               and contains moderate concentrations of MTBE.
       3.      The Wellhead Protection  Zone:  This zone is farthest downgradient along the plume,
               and contains MTBE at lower concentrations than the first two zones.

-------
Figure 1-1 indicates the extent of the MTBE plume at Port Hueneme as of August 1999, and identifies the
three zones within the plume; Figure 1-2 provides an expanded view of the Middle Zone, the location of
the Envirogen technology demonstration.

1.3    TECHNOLOGY DESCRIPTION
This section describes the Envirogen propane bio stimulation technology that was demonstrated at the
NBVC, Port Hueneme, California.

1.3.1   Principles of the Propane Biostimulation Technology

The Envirogen technology that was applied in this demonstration was an extension of conventional
biosparging methodologies in that pure oxygen and propane sparging were applied in a bio stimulation
mode.  The conceptual approach involved the addition of oxygen (for aerobic respiration) and propane (as
a cosubstrate) to stimulate the propane oxidizing bacteria (POB) in the production of the enzyme propane
monooxygenase (PMO) that catalyzes the degradation of MTBE and its primary degradation product,
TEA, to carbon dioxide and water (Figure  1-3). Exogenous propane oxidizing bacteria (POB)
Rhodococcus ruber strain ENV425 was used to seed the aquifer at the onset of the demonstration to insure
activity and speed initiation of the treatment process.

Envirogen claims that oxygen and propane flow rates were designed to provide an adequate substrate to
create an aerobic treatment zone and stimulate enzyme production, while minimizing the stripping of
VOCs and off-gassing propane and oxygen. Therefore, much lower oxygen injection flow rates were
required for their process compared to conventional biosparging. Gases can be injected into conventional
sparging wells, using permeable membranes or tubing, or using in-well sparging or mixing techniques.
Because substrate mixing occurs within the saturated aquifer, soil vacuum extraction (SVE) operation is
typically not required.

A review of the technical literature suggests that the biostimulation technologies can be applied in a variety
of configurations to provide source area treatment or downgradient plume containment, depending on  site
characteristics and remediation needs including:
        1.      A modified multi-point air sparging system (Salanitro et al., 1999 and 2000; Benner et
               al, 2000; Clayton et al., 1995; Ji et al., 1993; Johnson, 1994; Johnson et al., 1993 and
               1996; Pankow et al., 1993) that delivers propane air or oxygen throughout a contaminated
               site (suitable for use with existing systems or specially designed systems),

-------
                                                                            MTBE Plume
                                                                         4575' long (45 acres)
                                                                                    Equilon Culture  BC-4
                                                                                    In-Situ Bioremediation
                                                       UC Davis Culture
                                                       Injection PM-1
BTEX Contour 1  ppm

MTBE Contour 25 ppb
                                              Figure 1-1. Port Hueneme Plume Map

-------
                                                Equilon/Culture  BC-
                                                In-Situ  Bioremediati
KPATerformance
Monitoring Plots
                          CBC-45
      UC Davis Culture
       Injection PM—1
           50   100
          FEET
                                                                              &EPA
                             Figure 1-2. Site Location

-------
                            O —  Bacteria— 1   Propane
                  MTBE
                  MTBE
MTBE
         MTBE
        = o
         MTBE
 MTBE   o
 Propane
°     o
 MTBE^o
 co
'co.
' co
.  co
                                         Propane Oxidizing Bacteria
                                                            Propane Oxidizing Bacteria
               Figure 1-3.  In-Situ Application of Propane Biostimulation.
    (Modified from Draft In-Situ Remediation of MTBE Contaminated Aquifers Using Propane Biostimulation, Technology
                                 Demonstration Plan, 2000, by Envirogen.)
(A variety of configurations to apply propane biostimulation technology continued from Page 7):
        2.      A series of oxygen/propane delivery points arranged to form a permeable treatment wall
               to prevent off site migration of MTBE,
        3.      A permeable treatment trench fitted with oxygen and propane injection systems, and
        4.      An in-situ recirculating treatment cell that relies on pumping and reinjection to capture
               and treat a migrating contaminant plume.
Envirogen further claims that propane biostimulation has several advantages over existing MTBE
remediation technologies.  The primary advantage is that the technology can be applied in-situ to
completely remediate MTBE and TEA without generation of waste products. Because propane
biostimulation technology is an extension of conventional air sparging and biosparging techniques, the
existing knowledge base regarding their design and implementation allows simplified application of the
technology. Moreover, the addition of propane injection to existing or new systems may be able to be
accomplished with minimal added equipment and costs.  Because the technology is complementary to air
sparging, biostimulation treatment zones can be developed in conjunction with source treatment measures
to address BTEX and other fuel hydrocarbons.  If inhibition arises due to the presence of these
                                                10

-------
compounds, the propane biostimulation treatment zone can be established downgradient by adding
additional oxygen and propane treatment, and applied sequentially after BTEX compound concentrations
are reduced.

For this demonstration, the propane and oxygen were injected into the saturated aquifer using sparging wells
and pressurized gas systems designed to provide flexible performance characteristics and safe operation.
Oxygen and propane were intermittently sparged into the aquifer using separate sparge points at a total rate of
approximately 1- to 10-pounds/day and 0.1- to 0.5- pounds/ day, respectively. The vendor (Envirogen)
claims that the frequency and duration of sparging were optimized based on the results from start-up
monitoring to minimize off gassing of oxygen and propane to the vadose zone and stripping of MTBE.

1.3.2   Demonstration System Design

The Envirogen's demonstration system consisted of a network of oxygen, bacteria, and propane injection
points, pressurized oxygen and propane gas delivery and control  systems, and ground-water and soil-gas
monitoring network.  Figure 3-1 illustrates the layout of the demonstration system.

The Test Plot consisted of a network of injection wells designed  to deliver oxygen and propane into the
ground water to stimulate the appropriate microbial metabolic processes.  Eight-oxygen injection points
(OIPTs) and 7-propane injection points (PIPTs) were installed as shown on Figure 3-1. The OIPTs were
spaced 1-meter (3.28 feet) apart on a line perpendicular to ground-water flow. The PIPTs were placed
approximately 1.5 meters (4.9 feet) downgradient of the OIPTs, and offset from the OIPTs. Eight-
bacterial  injection points (BIPT) were installed between OIPTs and PIPTs. The BIPT were used for a one
time release of bacterial suspensions that occurred 16 days after the start of oxygen injection.  On May 23,
2001, the equivalent of 5 liters of bacterial culture at a density of 1011 cfu/mL were injected into the
aquifer at the Port Hueneme site, resulting in a final bacterial density in the aquifer of approximately 10s
cfu/mL.

The Test Plot ground-water monitoring network consisted of 16 dual-level, nested wells.  A background
well nest was placed along the centerline of the OIPTs, approximately 2.5 meters (8.2 feet) upgradient of
the OIPTs. Envirogen wells were placed in 5-rows of two nested wells each, at downgradient distances
from the  PIPTs. The center well in each row was aligned with the centerline of the OIPTs. The soil-gas
monitoring network consisted of 6 vapor monitoring points (VMPs) distributed around the OIPTs and
PIPTs.
                                               11

-------
The Control Plot was similar in configuration to the Test Plot, except that no bacteria or propane injection
points and fewer monitoring points were installed. Figure 3-1 illustrates the Control Plot configuration.
Eight-OIPCs were installed at 1-meter (3.28 feet) spacing along a line-oriented perpendicular to ground-
water flow.  The ground-water monitoring network consisted of 10 dual-level, nested wells: 1-upgradient
well nest and 3-rows of performance monitoring wells, placed at 2.25, 4 and 6.5 meters (7.4, 13.1, and
21.3 feet) downgradient from the OIPCs.  The soil-gas monitoring network consisted of 4-VMPs placed
around the OIPCs.

Oxygen and propane injection points were installed using Geoprobe™ methods.  The OIPTs, OIPCs , and
PIPTs were installed through the direct push rods using an expendable tip to anchor the assembly in the
formation at the design depth. Oxygen and propane injection points were constructed using 1-inch ID,
Schedule 40 PVC casings from 2-feet above the ground surface to approximately 10-feet below the water
table. The well screens were constructed using 1-foot length Schumaprobe ™ screens composed of
sintered polyethylene. The design for the propane and oxygen biostimulation system was based on the
anticipated requirements associated with a relatively small area.  As such, the equipment required to
provide and  control oxygen and propane supply were portable. The system consisted of pressurized
oxygen and propane tanks, individual oxygen and propane control manifold assemblies and a control
panel equipped with timers to allow pulsed operation of the injection systems. Figure 1-4 illustrates the
piping and instrumentation diagram for the system.

Separate oxygen distribution systems were set-up for the Test and Control Plots.  Each plot utilized two
75-pound oxygen cylinders piped in series with appropriate pressure regulators to allow oxygen delivery
at approximately 60 pounds per square inch gage (PSIG).  Oxygen flow to the manifold was controlled
using a timer actuated solenoid valve. Flow and operating pressure at each oxygen injection point well-
head was controlled using individual needle valves, sized to allow oxygen flow rates of 1 to 60 standard
cubic feet per hour (SCFH) at operating pressures of up to 12 PSIG. Each wellhead was equipped with a
flow meter and pressure valve port to allow flow balancing and system performance monitoring. The
primary distribution line  from the oxygen tanks, manifold assembly and individual wellhead distribution
laterals were constructed of materials designed for oxygen. The oxygen tanks for the Control and Test
Plots were housed in separate cages located near each plot as shown on Figure 1-4.

The Test Plot propane distribution system consisted of one 35-pound propane cylinder with appropriate
pressure regulator to allow propane delivery at 30 PSIG. Propane flow to the manifold assembly was
controlled using a timer actuated solenoid valve. Flow and operating pressure at each propane  injection
                                               12

-------
point wellhead was controlled using individual needle valves, sized to allow propane flow rates of 0.5 to 5

SCFH at 12 PSIG. Each wellhead was equipped with a dedicated flow meter and pressure valve port to
allow flow balancing and system performance monitoring. The primary distribution line from the

propane tank, manifold assembly and individual wellhead distribution laterals were constructed of

materials specifically designed for propane. The propane tank was housed in a separate cage near the

Test Plot.


The control panel was mounted on the exterior wall of the EPA shed in proximity to the utility pole and

properly anchored and grounded. The demonstration system utilized 3-phase, 208V power supplied by

NETTS. The system controls operated using conditioned power reduced to 24V AC power to the

individual timers and solenoid valves. The system was fabricated and shipped to the demonstration site to

meet the demonstration startup.  The individual system components were pre-assembled in a modular

fashion for ease of shipping and field assembly.



1.4     KEY CONTACTS


Additional information about the propane biostimulation technology and the NBVC demonstration can be

obtained from the following sources:


       Ann Keeley, Ph.D.
        U.S. Environmental Protection Agency
        Office of Research and Development
       National Risk Management Research Laboratory
        Subsurface Protection and Remediation Division
        919 Kerr Research Drive
       Ada, Oklahoma 74820
        Telephone: (580) 436-8890
        FAX: (580)436-8614
        Email:  keeley.ann@epa.gov

        Rob Steffan, Ph.D.
        Envirogen
        4100 Quakerbridge Road
        Lawrenceville, NJ 08648
        Telephone: (609) 936-6300
        FAX: (609) 936-9221
        Email: steffan@envirogen.com
                                             13

-------
       KT • 40 Pfl
 Oa
Cyl
4r
Ca
Cyl
                                    I
        I
        ^
      Prep
      Cyl
                                                                 --(=)--
               TO TEST PLOT INJECTION
                                                                                                           I               I
                                                                                       1   «T * H ra 4
                                                                                       I	I.
                                                                                             -A
Oi
Cyl
                                                                   TO CONTROL PLOT INJECTION
                     1    1ET« « «  •


                     I	1
                                                                                                                        Oi
                                                                                                                       Cyl
                                                       Figure 1-4. Piping Instrumentation Diagram
                  (Adopted from Draft In-Silit Remediation ofMTBF. Omtamiiititeii Aquifers Uxing Propane Binslimiilalion. Technology Demonstration Plan, 200(1. by Envirogcn.)

-------
                                         SECTION 2
           DEMONSTRATION OBJECTIVE AND EVALUATION JUSTIFICATION

The overall objective of the MTBE demonstration program was to exhibit and evaluate the cost
and performance of innovative MTBE treatment technologies at MTBE source and wellhead areas.
Unequivocally, regardless of the technology type or its application within the source, middle, or wellhead
zone, the final selection for the treatability criteria was to achieve the California target cleanup goal of 5
|ig/L. Accordingly, each technology was evaluated on its own merit and was not compared to any other
technology.

The final selection of various technologies upon their acceptance  of meeting the cleanup goal of 5 |ig/L at
the NBVC was guided by the technical representatives of a group of stakeholders that included the
following organizations:

       U.S. EPA, National Risk Management Research Laboratory (NRMRL)
       U.S. Navy, Naval Facilities Engineering Service Center (NFESC)
       U.S. EPA, Region 9
       California Department of Health Services (DHS)
       California Water Quality Control Board (WQCB)

Each of the stakeholders participated in conference calls and a meeting at the site in September 2000, to
discuss the technical details of the demonstration and to assure that the technical approach to the
demonstration adequately addressed elements of interest to potential users of each technology.

2.1    BACKGROUND

The ground water at the demonstration location within the Middle Zone was known to be contaminated
with gasoline constituents. The primary components of environmental concern included MTBE, and
products of MTBE degradation, including primarily fert-butyl alcohol (TEA). To confirm the presence of
these components and their approximate concentrations in the ground water in the vicinity of the proposed
test plots, an overview of the host site characterization is described.
                                              15

-------
2.1.1   NBVC Site Characterization

This section provides information gathered at the Port Hueneme site prior to the detailed design of the in-
situ MTBE bioremediation performance monitoring work plan and QAPP.  Essentially the pre-
demonstration characterization consisted of a determination of the background concentrations of chemicals
of interest to the demonstration.

2.1.2   Site Description

The selected location (site) for the propane biostimulation technology demonstration is situated
approximately 2,400 feet southwest of the NEX station, adjacent to the U.C. Davis and Equilon
demonstration plots (Figure 1-2). The area surrounding Envirogen's biostimulation technology
demonstration site has been characterized during prior site investigation activities and includes 4
monitoring wells (CBC-43,  CBC-44, CBC-45 and CBC-46) and 9 cone penetrometer (CPT) pushes to
determine stratigraphy of the soil.

2.1.3   Hydrogeology

The geology at the site consists of unconsolidated sediments composed of sands, silts, clays and minor
amounts of gravel and fill material.  A shallow, perched, unconfined  aquifer is the uppermost water-
bearing unit. The shallow aquifer is comprised of three depositional  units: an upper silty-sand, an
underlying fine- to course grained sand and a basal clay layer. Based on CPT pushes, the upper silty-sand
unit ranges between 8 to 10 feet thick and the underlying sand is approximately 12 to 15 feet thick.  The
water table is generally encountered at depths between 6 to 8 feet below ground surface (BGS), with
seasonal fluctuations ranging between 1 and 2 feet, yielding a saturated aquifer thickness of 16 to  18 feet
near the test area.

Ground-water flow is generally to the southwest under hydraulic gradients between 0.001  and 0.003 ft/ft.
Transmissivity estimates for the  shallow aquifer were derived based on pumping tests and slug tests, with
results ranging between 2,500 and 6,500 ft2/day.  Based on an average saturated thickness of 17 feet,
hydraulic conductivity estimates range between  170 and 440  ft/day (6 x 10"2 to 1.6 x 10"1 cm/s). Estimated
ground-water flow velocity ranges between 230 and 330 feet/year, assuming an aquifer porosity of 0.35.
                                                16

-------
2.1.4   Contaminant Distribution

Ground-water contamination is limited to the perched aquifer across the NBVC facility.  Monitoring wells
CBC-45 and CBC-46 represent the ground-water quality conditions within the dissolved MTBE plume
near the demonstration site (Figure 1-2).  Historical ground-water sampling from these wells between
September 1998 and September 1999 indicate MTBE concentrations ranging between 6,300 to 3,500 ug/L
at CBC-45 and 4,000 to 1,100 ug/L at CBC-46. (CBC-45 is screened at IT - 18' BGS and CBC-46 is
screened at 12' - 13' BGS.) Apart from a fert-butyl alcohol (TEA), an intermediate metabolite, detection of
470 ug/L at CBC-45 in June 1999, none of the other samples exhibited TEA or gasoline (BTEX
compounds) concentrations above their respective practical analytical laboratory quantification limits.

Based on the initial hydrogeologic and contaminant characteristics, it was believed that the selected site
would provide an ideal setting for evaluating the performance of the propane biostimulation approach. In
order to confirm the presence of the primary components of environmental concern at the proposed
Envirogen demonstration site, EPA's Subsurface Protection and Remediation Division (SPRD), Ada,
Oklahoma, performed pre-characterization activities as described in the following section.

2.2    TECHNOLOGY DEMONSTRATION SITE PRE-CHARACTERIZATION

To characterize the contaminated ground water at the demonstration location within the Middle Zone, on
September 26, 2000, during EPA's pre-characterization activities at Port Hueneme, ten monitoring wells
were installed inside the in-situ bioremediation (Envirogen) fenced area.  The ten 2-inch wells were
constructed and developed using a direct push rig, 5 wells upgradient, in a straight line immediately inside
the east fence of the site (wells ID 6 - 10) and 5 wells downgradient, in a straight line immediately inside
the west fence (wells ID 1 - 5).  The two lines are approximately 50 feet apart.

Wells ID 2 - 5 were sampled twice, once with filtration and once without filtration. First, water samples
ID 1 - 5 were collected after passing through the water filter (water flow-through cell); and, second, ID
samples 2-5 were re-sampled directly from the wells.  Samples from wells ID 6 - 10 were collected
directly from the wells without filtration. The sampling direction was south to north (assuming an
increasing concentration gradient).  The samples were analyzed by CapCo Analytical Services Inc.,
Ventura, California, for MTBE and d-MTBE (Practical  Quantitation Limit of 5.0 ug/L),  TEA, and BTEX
                                               17

-------
by EPA Method 8260 (EPA 1995; 1996). The results indicated there was no d-MTBE or BTEX, while
MTBE ranged from 296 - 5,040 ug/L.  The wells were sampled again on October 4, 2000, and were
analyzed by ManTech Environmental Services (ManTech) in Ada, Oklahoma, according to RSKSOP-217
"Determination of Methyl Tertiary Butyl Ether, Tertiary Butyl Alcohol, and Volatile Aromatic Compounds
in Water by Automated Headspace Gas Chromatography/Mass Spectrometry."  The results of the
laboratory analysis of these ground-water samples are shown in Table 2-1 and confirmed the presence of
the expected gasoline components.  Based on the results of these analyses, the study participants concluded
that the proposed test area contained adequate levels of MTBE in the ground water to challenge
Envirogen's biological barrier technology. Non-detectable levels of BTEX compounds were also
confirmed for the process.

During the month of November 2000, additional pre-characterization samples were obtained from the site for
purposes of method proficiency testing. These samples were analyzed by 4 different laboratories in order to
confirm that MTBE analyses could be performed by conventional purge-and-trap procedures.  Summarized
in Table 2-1 are data from this study to further support the supposition that ground water at the site contain
adequate concentrations of MTBE and also show that no BTEX is present.

In addition to the gasoline components identified above, the stakeholders identified a number of potential
by-products of biochemical oxidation that may well be formed during treatment of ground water using the
Envirogen technology. Specifically, by-products from the microbial oxidation of MTBE were expected to
include TEA, acetone, 2-propanol, and formaldehyde as shown in Table 2-2.

The contaminants of interest identified above were, therefore, included on the list of parameters to be
determined in both upgradient and downgradient samples during the demonstration in order to assess the
effectiveness of the Envirogen treatment. Based on the review of the regulatory criteria for these
contaminants of interest and discussions among the stakeholders, treatment goals were established for
selected contaminants of interest as listed in Table 2-3.  The treatment goals for MTBE and TEA were
identified as the lowest maximum contaminant level (MCL) or action level (AL) promulgated by the State
of California. No treatment goal was set for the Disinfection By-Product Rule (DBPR) since ground water
was not to be used as a drinking water supply. The other regulatory criteria presented in Table 2-3 for
critical and non-critical parameters were used as advisory information and not as basis for setting the
treatment goals for the Envirogen demonstration.
                                               18

-------
The demonstration of the Envirogen technology was implemented in one phase, the technology was
evaluated over a ten-month period during June 2001 to March 2002 at presumably steady-state operating
conditions. For this demonstration, a specific set of objectives was formulated and a quality assurance
project plan (QAPP) was written to guide the EPA field sampling, laboratory analysis, and data evaluation
efforts.

2.3    DEMONSTRATION OBJECTIVES

The objectives of the demonstration were to determine the effectiveness of using propane and oxygen
biostimulation and bioaugmentation [exogenous propane oxidizing bacteria (POB) Rhodococcus ruber
strain ENV425] as a potential remedial alternative for the removal of MTBE from ground water. Although
MTBE concentrations upgradient and downgradient of the treatment system were evaluated, the
technology critique was centered on the fate of d-MTBE added to the system. The d-MTBE and iodide (a
conservative ground-water tracer) were used to evaluate biotic and abiotic (dispersion) attenuation as the
contaminant passed through the biological barrier. The ratio of the ground-water tracers between
downgradient transects provided evidence concerning the relative losses of MTBE resulting from
dispersion and degradation. The use of d-MTBE provided evidence  of biodegradation by tracking the
generation of d-MTBE daughter products.  For this demonstration, the deuterated daughter products that
were tracked include d-TBA, d-2-propanol, and d-acetone.  To meet the specific project requirements, the
determination of MTBE, d-MTBE, and their respective metabolites were accomplished by the analysis of
collected samples using GC/MS methodology with reporting limits (minimum quantitation limits) that
were, at the minimum, 100 times lower than the applied concentration of the tracers of interest.

Project objectives were met through the establishment of Test and Control Plots, a network of conventional
upgradient and downgradient monitoring points in the aquifer  and vadose zone, and a ground-water tracer
mixing and injection system.  The treatment plot received Envirogen's biostimulation technology
consisting of oxygen, propane, and POB amendments. The  Control Plot received only oxygen
amendments. A ground-water tracer injection system was used to determine spatial ground-water flow
patterns (vertical and horizontal) in the Test and Control Plots  before and during treatment.

The evaluation of the Envirogen demonstration consisted of two  phases including the pre-demonstration
tracer study and the long-term demonstration evaluation. During the first phase, bromide was used to
                                               19

-------
Characterize ground-water flow and time of travel. The second phase incorporated the use of d-MTBE and
iodide to address expected decreases in d-MTBE concentrations and determine the extent of the reductions
with respect to biodegradation or dilution.

Also, as noted above, a critical phase of this technology performance evaluation was a ground-water tracer
study utilizing a mixing and injection system. This system, designed and installed by SPRD delivered
bromide into the ground water at both the Test and Control Plots during the pre-demonstration period to
achieve two objectives. First, to validate the hydraulic properties at the site, and second, to determine the
efficacy of the tracer system for its use during the long-term performance demonstration period.

During the pre-demonstration activities consisting of approximately 4 weeks of bromide injection (January
31 - February 28) and subsequent on-going monitoring, the system operated adequately to allow an
evaluation of the effectiveness of the demonstration. This was supported by significant bromide
"hits"(concentration of approximately 2 ppm and above) throughout the test period in both the oxygen and
propane injection wells. All oxygen, propane, and first two downgradient transect monitoring wells in the
Test Plot received bromide hits.  Six of the eight oxygen wells and first two downgradient transect
monitoring wells in the Control Plot also received bromide hits.  However, all bromide hits occurred at the
deep (Blue) screen with one exception: that being an intermediate level screen in the Control Plot.  These
findings indicate that d-MTBE and tracers in the injection wells were in direct and constant
communication with the vendor treatment gases. Furthermore, the tracer injection system delivered the
proper concentration consistently and reliably for the duration of the injection period.

Based on the results of the pre-demonstration study, there was sufficient evidence that the system would
operate adequately during the long-term monitoring period. Preliminary evaluations of the pre-
demonstration bromide tracer study indicated that, aquifer properties in the test areas were consistent with
expectations.  Therefore, no deviation from the original design of the study was warranted in terms of the
rate and volume of samples collected. Furthermore, the pre-demonstration results were used by the SPRD
Technical Project Manager (TPM) in designing the monitoring plan for the performance evaluation phase
of the project as well as to determine the  amount of d-MTBE and iodide necessary for injection. Since it
was determined that most ground-water flow occurred in the lower part of the aquifer, the middle and
upper wells screens were sampled less frequently. By concentrating on the lower  aquifer sampling points,
the project was expanded to 15 sampling events rather than the originally planned 7, thereby increasing the
statistical strength of the project results.

                                                20

-------
For the concentrations of the tracer suites, bromide was introduced to the aquifer by adding 352 mg of
bromide ion to each well each day. Downgradient bromide concentration values were found to vary
significantly, due to the heterogeneity of the aquifer material between sampling points, with no bromide
being observed at some locations and concentrations as high as 25 mg/L at transects 2 and 3. Based upon
these values, a concentration of 15 mg/L was selected as a representative value for purposes of calculating
d-MTBE and iodide injection concentrations.  Therefore, the planned d-MTBE and iodide concentrations
and additions to the injections wells were based on direct ratios of the bromide results.

The planned concentration of d-MTBE in ground water was approximately 1 mg/L. To obtain this
concentration,  23 mg of d-MTBE was introduced into each injection well daily.  To assure adequate tracer
results, the concentration of iodide was approximately  10 mg/L in the aquifer. To obtain this
concentration,  235  mg of the iodide ion was introduced into each injection well daily.

In order to reduce d-MTBE losses to airspace within the tracer reservoir, two 3.8 liter Tedlar bags were
used: one for the Control Plot and one for the Test Plot. Consequently, there was no need to use Argon gas
as specified in  the previous Quality Assurance Project Plan (QAPP). The injection rate of d-MTBE was
planned at 10 ml/well/day in order to achieve the desired concentration of approximately 1 mg/L in the
aquifer. The total injection volume per plot (Test  and Control) for 14-days is equal to 10 ml x 19 wells x
14days which equals 2.66 liters.  In order to keep the bags from becoming empty, 3 liters of tracer solution
was used as the basis for calculating tracer concentrations in the Tedlar bags used for injection.  The d-
MTBE was prepared in laboratory ampules for addition to the bags in the  field.

Since the injection  of oxygen began on May 7, 2001, and the one-time release of the bacterial culture
occurred on May 23, 2001, it was assumed that the bacterial culture had been established in the  aquifer.
Therefore, uniformly labeled d-MTBE and iodide  was first introduced to the aquifer on June 8, 2001.

2.3.1           Primary Objective - A Critical  Measurement.

The primary project objective was for Envirogen to demonstrate that its in-situ technology could
effectively remediate the site under consideration.  The effectiveness of the technology was established by
examining multiple performance criteria. The critical measurement was whether the levels of d-MTBE
and MTBE were significantly less than 5 ug/L in the samples taken over a 10-month period. As shown in
                                               21

-------
Table 2-4, sampling took place during 15 separate events during the 10-month demonstration, however,
only events 4 through 15 were used to evaluate the primary objective.

The primary objective was, therefore, determined by degradation of MTBE in samples collected
downgradient of Envirogen's biological barrier over 10 months of continuous operation.  This degradation
was established by measuring d-MTBE concentrations in the "qualified samples" and determining
whether, with 80% confidence, the estimate of the population mean is at or below 5 |ig/L. A qualified
downgradient monitoring point was one that, at the time of sampling, contained detectable levels of iodide.
 Iodide and d-MTBE were injected at the onset of the demonstration. During all sampling events, each of
the samples collected were evaluated first to assess whether the sample contained iodide at concentrations
above the detection limit.

Ground-water samples from all the qualified downgradient monitoring points from the deep screen  portion
of the aquifer for events 4 through  15 were used for the purpose of quantifying the success of the
evaluation. The approved Pre-Quality Assurance Project Plan Agreement (PQA), May 2001, documented
the statistical justification and confidence levels associated with the determination of the number of critical
samples for the analytes of concern. These samples represented the experimental units for the evaluation
of the primary objective.

2.3.2    Secondary Objectives - Non-Critical Measurements

The evaluation was further supported by a number of secondary objectives which provided additional
information on treatment processes.
        1.      Determine time of travel to the sampling points using bromide: The pre-
               demonstration bromide tracer study was carried out to determine the time of travel to
               downgradient monitoring wells. This assessment has enabled a more in-depth analysis of
               ground-water velocity as well as provided information on the hydrologic properties of the
               system to allow a better understanding of the technology's performance. This information
               was used to design the sampling plan for the long-term demonstration evaluation.

        2.      Establish the absence of trace metals inhibitors: During the first sampling event, metals
               which may inhibit microbial metabolism were assessed to determine potential impact on
               the technology.
                                               22

-------
3.      Evaluate the formation of daughter products and determine if they were consistent
       with a microbiological transformation process:  The biodegradation of MTBE and d-
       MTBE was expected to result in by-products (i.e., TEA, 2-propanol, acetone, and
       formaldehyde) some of which may contain deuterium. These products would provide
       supporting evidence that microbial degradation was resulting from the reduction of MTBE
       and d-MTBE, as opposed to other abiotic processes (such as dispersion) which could be
       occurring.
       Evaluate changes in geochemical parameters and determine if they were consistent
       with the microbiological transformation processes: Parameters such as dissolved
       organic carbon (DOC), total organic carbon (TOC), alkalinity, sulfide, sulfate, Fe++,
       conductivity, dissolved oxygen (DO), pH, and water levels were measured to assess
       whether the ground-water characteristics will be in agreement with the changes expected
       based on aerobic degradation processes.
5.      Define operating costs over a 10-month period of stable operation: The cost analysis
       of the Envirogen technology demonstration at NBVC will be presented along with the unit
       cost to remediate the ground water contaminated with MTBE per gallon.
6.      Estimate exponential order of degradation and calculate MTBE degradation rate
       constant: Using the concentration of d-MTBE from the qualified samples collected
       during various time intervals, the rate of MTBE degradation would be calculated.  A first
       order degradation of the MTBE concentration will be assumed which allowed the
       degradation rate to be calculated using the log of the concentration versus time and
       determining the regression coefficient using a least squares analysis.
       Determine the fraction of d-MTBE removed at each sampling location at each
       sample time:  Using the concentration of d-MTBE in samples collected during the 15
       sampling events (Table 2-4), the change in the ratio of d-MTBE concentrations to the
       tracer concentrations were determined, in accordance with the following equation:

                              [(d-MTBEi/hdideO/Cd-MTBE^alide,)]
           where "i" is the initial concentrations of the tracers and "s" is the
                                subsequent values

       Samples found to meet the qualifications for MTBE reduction due to degradation (i.e.,
       samples containing iodide) will be used in determining the degradation rate constant. The
       purpose of this objective is to compare the relative magnitude of biodegradation between
       sampling events. Consider the following examples:

              A. At time (i) the d-MTBE concentration at a specific sampling point is 1 ppm
              and the halide concentration is 10 ppm, and that at time (s) the d-MTBE
              concentration is also 1 ppm and the halide concentration is 10 ppm.  This would
              yield a ratio of 1 and indicate that no degradation has occurred.
                                       23

-------
       B. At time (i) the d-MTBE concentration at a specific sampling point is 1 ppm
       and the halide concentration is 10 ppm, and that at time (s) the d-MTBE
       concentration is 0.5 ppm and the halide concentration is 5 ppm. This would also
       yield a ratio of 1 and indicate that no biodegradation has taken place even though
       there was a reduction in d-MTBE from 1 ppm to 0.5 ppm. A similar relative
       reduction in the halide tracer indicates that a portion of the ground water was
       diverted from the sampling point thus resulting in  lower concentrations of d-
       MTBE.

       C. At time (i) the d-MTBE concentration at a specific sampling point is 0.5 ppm
       and the halide concentration is 5 ppm, and at time  (s) the d-MTBE concentration
       is 0.1 ppm and the halide concentration is 5 ppm.  This would yield a ratio of 5
       and indicate that there is a relative 5x degradation  of d-MTBE.

       D.  At time (i) the d-MTBE concentration at a specific sampling point is 0.1 ppm
       and the halide concentration is 5 ppm, and at time  (s) the d-MTBE concentration
       is 0.5 ppm and the halide concentration is 5 ppm.  This would yield a ratio of 0.2
       which also indicates a 5x change; however, the level of degradation has
       decreased.

Therefore, the equation will be used to calculate the ratio between sampling events at each
location and interpreted as follows:  A ratio of 1  indicates no relative change in
degradation. Ratios of >1  indicate a relative increase in degradation between events.
Ratios of <1 indicate a relative decrease in degradation between events. These ratios will
be mapped  to visualize the relative spatial changes in degradation.

Evaluate d-MTBE reduction in the Control Plot receiving only oxygen injection.
Tracers were injected into the Control Plot in the same manner as the  Test Plot allowing
an assessment of changes in MTBE  and d-MTBE concentrations as a result of indigenous
bacteria relative to the changes observed in the Test Plot by the exogenous microflora.
According to the  PQA, concentrations of d-MTBE between the Test Plot and Control Plot
will be examined statistically.
                                24

-------
                                          Table 2-1
                          Summary of Site Characterization Analytical
                   Results For Contaminants of Concern at The Middle Zone
Pre-characterization Sampling Event, September 2000
Well
Number
1
2
o
J
4
5
6
7
8
9
10
Sample ID
MW- 1
MW-2
MW-3
MW-4
MW-5
MW-6
MW-7
MW-8
MW-9
MW- 10
MTBE
Hg/L
3,750
4,650
4,090
591
296
341
5,040
3,250
3,260
1,900
TEA
Hg/L
11.1
12.3
13.7
ND(10)
ND(10)
ND(10)
17.4
ND(10)
10.5
ND(10)
Ethyl
benzene
HS/L
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
Benzene
[ag/L
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
Toluene
Hg/L
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
Total
Xylenes
|ig/L
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
Results from Method Validation Study, November, 2000
Laboratory
Number
Lab 1
Lab 2
Lab 3
Lab 4
Sample ID
GWT
(lab 1)
GWT
(lab 2)
GWT
(lab 3)
GWT
(lab 4)
MTBE |J,g/L
2960-3010
2500 -2900
2200 -2840
2200 - 2550
TEA
ND-12
ND-69
60-80
10-21
2-Propanol
Hg/L
ND
ND
ND
ND
Acetone
Hg/L
ND
ND
ND
ND
BTEX
Hg/L
NA
NA
NA
ND
|jg/L   micro grams/Liter
NA    not analyzed
ND    not detect

-------
                                             Table 2-2

     Analyses to Support the Propane Biostimulation and Bioaugmentation Project Objectives
Matrix
Ground Water
(upgradient and
downgradient
monitoring wells in
treatment and control
plots)
Parameter
Deuterated-
MTBE/MTBE
Iodide
Deuterated-TBA/TBA
Deuterated-
Acetone/Acetone
Deuterated-2-
propanol/2-propanol
Formaldehyde
Alkalinity
TOC
DOC
Conductivity
Temperature
Sulfide
PH
Fe(II)
Water Level
Dissolved Oxygen
Phosphate
Sulfate
Nitrate
Nitrite
Metals
Ammonia
Classification
Critical
Critical
Non-critical
Non-critical
Non-critical
Non-critical
Non-critical
Non-critical
Non-critical
Non-critical
Non-Critical
Non-critical
Non-critical
Non-critical
Non-Critical
Non-critical
Non-critical
Non-critical
Non-critical
Non-critical
Non-critical
Non-critical
Type
Analytical
Analytical
Analytical
Analytical
Analytical
Analytical
Analytical
Analytical
Analytical
Field
Field
Field
Field
Field
Field
Field
Analytical
Analytical
Analytical
Analytical
Analytical
Analytical
Purpose
l°objective:MTBE
reduction.
1° objective: MTBE
reduction.
2° objective: ground-water
flow field determination
2° objective: Evaluate
biotic generation of MTBE
daughter products
2° objective: Geochemical
indicators of ground water .

2° objective: determine
presence of treatment gas in
ground water.
2° objective: Evaluate
characteristics for support
of biological processes
Note:
        Biostimulation included application of oxygen and propane to the Test Plot, and oxygen to the Control Plot.

        Bioaugmentation included one time release of Envirogen propane oxidizing bacteria (FOB) Rhodococcus
        ruber strain ENV425 into the aquifer at the Test Plot. The Control Plot was devoid of exogenous bacteria.
                                                 26

-------
                                                      Table 2-3
                                       Applicable Regulatory Criteria for
                           MTBE Treatment Technology Demonstration Program

PARAMETER GROUP
Volatile organics







DW parameters
(SDS Testing)

Aldehydes/glyoxals




Wet chemistry


MTBE*
TEA
Acetone
Benzene
Toluene
Ethylbenzene
Xylene0
TTHMS
HAAs
NDMA
Formaldehyde
Acetaldehyde
Heptaldehyde
Glyoxal
Methyl glyoxal

Bromate
CA
Primary
MCL
MCL
(mg/L)

0.013
NA
NA
0.001
0.15
0.7
1.75
0.1
NA
NA
NA
NA
NA
NA
NA

NA

CA
Secondary
MCL
(mg/L)

0.005
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA

NA

CA
Action
Level
(mg/L)

NA
0.012
NA
NA
NA
NA
NA
NA
NA
0.00002
NA
NA
NA
NA
NA

NA
CA
Public
Health
Goal
(mg/L)

0.013
NA
NA
0.00014"
0.15
0.3
1.8
NA
NA
NA
NA
NA
NA
NA
NA

NA

Stage 2
DBPR
MCLb
(mg/L)

NA
NA
NA
NA
NA
NA
NA
0.08
0.06
NA
NA
NA
NA
NA
NA

0.01

Demonstration
Treatment Goal
(mg/L)

0.005
0.012
NA
0.001
0.15
0.7
1.75
0.08
0.06
0.00002
NA
NA
NA
NA
NA

0.01
Abbreviations:

CA: State of California
DBPR: Disinfection Byproduct Rule
DO: Dissolved oxygen
DW: Drinking water

Notes:
* Critical parameter (associated with a
primary Envirogen demonstration
objective)

a.) Sources:   California DHS:

Stage 2 DBPR
b.) Draft or proposed values.
c.) Single isomer or sum of isomers
HAAS: Haloacetic aids
MTBE: Methyl terf-butyl ether
NA: Not Available
Primary MCLs and Lead and Copper
Action Levels (January 2001), Secondary
MCLs (May 2000), Action Levels
(February 2001),
Public Health Goals (January 2001)

Stage 2 Microbial and Disinfection
Byproducts Federal Advisory Committee
Agreement in Principle; 65 FR 83015
(December 29, 2000)
SDS: Simulated Distribution System
TEA: terf-Butyl alcohol
TTHMs: Total trihalomethanes
                                                           27

-------
2.4    SCHEDULE

The demonstration of Envirogen oxygen and propane biostimulation and bioaugmentation technology was
implemented in one phase; the technology was evaluated over a ten-month period during June 2001 -
March 2002 as shown in Table 2-4. While the injection of the vendor's gaseous substrates (oxygen and
propane), and SPRD tracers (d-MTBE and iodide) starting dates are provided in Table 2-4, their release
continued throughout the project period.

Prior to the start of the demonstration, Envirogen conducted a background-sampling event on May 2, 2001,
and requested a two-week period for the sparging system optimization (May 7 - May 21). At the
conclusion of this period, a second background-sampling event on May 22, was followed by the injection
of an exogenous culture on May 23, 2001. After the aquifer was presumably equilibrated, the injection of
EPA's tracer started on June 8, 2001.  Envirogen and EPA's first sampling event were conducted on June
12, 2001, and June  14, 2001, in accordance with the time of travel established during the bromide tracer
study.
                                              28

-------
                        Table 2-4
          U.S. EPA Performance Monitoring
                   Sampling Schedule
Event
Process
Optimization
Treatment
Treatment
Tracer
Event 1
Event 2
Event 3
Event 4
Event 5
Event 6
Event 7
Event 8
Event 9
Event 10
Event 1 1
Event 12
Event 13
Event 14
Event 15
Description
Oxygen Sparge
Propane and
Oxygen Sparge
B io augmentation *
d-MTBE/Iodide
GW Sampling
GW Sampling
GW Sampling
GW Sampling
GW Sampling
GW Sampling
GW Sampling
GW Sampling
GW Sampling
GW Sampling
GW Sampling
GW Sampling
GW Sampling
GW Sampling
GW Sampling
Date
05/07-20/01
05/21/01
05/23/01
06/09/01
6/14/01
06/28/01
07/09/01
07/17/01
07/30/01
08/13/01
08/27/01
09/10/01
09/24/01
10/08/01
11/05/01
12/03/01
01/07/02
02/11/02
03/08/02
GW: Ground Water
*:  Bioaugmentation included a one-time release of Envirogen propane oxidizing bacteria (FOB)
Rhodococcus ruber strain ENV425 into the aquifer at the Test Plot. The Control Plot was
devoid of exogenous bacteria.
                           29

-------
                                         SECTION 3
                        PERFORMANCE MONITORING APPROACH

The demonstration objectives outlined previously in Section 2 were achieved by a carefully designed
performance monitoring program, developed by the SPRD TPM, which provided data to evaluate the
technology. The evaluation of the Envirogen technology was accomplished by the sampling and analysis
of both the Test and Control Plots illustrated in Figure 3-1.  It is important to note that throughout the
report the well-screen designations are: Red (R) for shallow; Yellow (Y) for middle; and Blue (B) for
deep locations.  Both plots included a series of well clusters to allow the collection of ground-water
samples at discreet depth intervals.  Sample collection and analysis, in support of the various objectives,
included a suit of tracers injected as an integral part of this evaluation. The following sections provide
details on the experimental design used in the evaluation of Envirogen's biostimulation technology. These
sections include a discussion of how the design achieved project objectives, a description of the layout of
the Test and Control Plots and a description of the tracer injection system.

3.1     TRACER STUDY DESIGN COMPONENETS

The Envirogen technology demonstration was designed to determine the efficacy of using propane and
oxygen biostimulation and bioaugmentation (exogenous propane oxidizing bacteria Rhodococcus ruber
strain ENV425) as a potential remedial alternative for the removal of MTBE from ground water.
Achieving this objective resulted, in great measure, from the use of d-MTBE and ground-water tracers.
The ratios of ground-water tracers between downgradient transects provided evidence concerning the
relative losses in MTBE concentrations resulting from dilution and degradation.  Likewise, the use of d-
MTBE ratios in downgradient transects served as a tracer of anthropogenic MTBE.  More importantly,
the use of d-MTBE provided evidence of biodegradation by the realization of d-MTBE daughter products.

A critical element of this evaluation was the utilization of a ground-water tracer mixing and injection
system.  It was essential for delivering mixed tracers into the ground water at both the Test  and Control
Plots. A uniformly labeled d-MTBE was introduced through the ground-water tracer mixing and
injection system, upgradient of the oxygen and propane injection location at a concentration of
approximately 1 mg/L.  Section 2.3 discusses specifics of the tracer injection system that was designed to
be operational for the duration of the demonstration.
                                              30

-------
The ground-water tracer mixing and injection system consisted of 19 well injection points directly
upgradient of the oxygen and propane injection points in both the Test and Control Plots (total of 38
wells). Tracer materials, including d-MTBE and iodide or d-MTBE, iodide, and bromide were metered
into each well so as to deliver a known and constant concentration into the ground water. A pre-
demonstration ground-water flow study, using bromide as the tracer, was implemented prior to the start-
up of the vendor's technology to document natural ground-water flow gradients and provide a baseline for
the tracers in downgradient monitoring points. A configuration of the tracer mixing and injection  system
is shown in Figure 3-2.  Figure 3-3 depicts the cross section of the tracer circulation components.  Each
injection well was installed to a depth of 24 feet BGS.  The tracers were introduced to each well by a
metering pump connected to a 1/8" stainless steel line which discharged to the well below the top of the
water table.  Seasonal ground-water fluctuations were considered prior to positioning the line. In order to
recirculate ground water at approximately 100 milliliters per minute, each well was equipped with a
bladder pump.  Tubing was used to connect the bladder pumps to the compressor via air controllers. Each
controller operated two pumps and a total of 20 controllers were employed for the construction of the
system. Two 40-channel metering pumps were employed for the injection of the tracers  into the thirty-
eight 2-inch wells at an approximate flow rate of 10 ml/well/day.

A multiple-tracer approach was employed (Thierrin et al., 1992, 1993, and 1995; Poulson et al., 1997;
Aeschbach-Hertig et al., 1998; Davis et al., 2000; Parker and van Genuchten, 1984; Kenoyer, 1988;
Melville et al., 1991;  Meiri, 1989; Bowman and Gibbens, 1992; Bullivant and O'Sullivan,  1989; Stute et
al., 1987; Patrick and Barker, 1985; Gupta et al., 1994; Poulson et al., 1995;  Stevenson et al., 1989).
Iodide  or iodide and bromide were used in response to abiotic issues and deuterated-MTBE was used to
reliably quantify the biotic challenges. The d-MTBE tracer was identical to the primary contaminant of
concern. Since in practice, deuterated and non-deuterated species have the same fate and solute transport
properties (i.e., sorption, desorption, biodegradation), they can be employed  like internal standards for the
assessment of in-situ  intrinsic or enhanced bioremediation. The use of d-MTBE provided evidence to
determine if microbes metabolize MTBE partially to TEA (incomplete biodegradation) or completely to
CO2  The d-MTBE migrated  with the ground water containing the intrinsic MTBE. It was expected that
the cometabolic degradation (Gamier et al., 1999; Hyman et al., 1998) of d-MTBE would result in
daughter products (e.g., TEA, 2-propanol, acetone) containing deuterium which can easily be determined
by gas  chromatography/mass  spectroscopy (AWWA, 1998; Bianchi and Varney, 1989; Bonin et al., 1995;
Church et al., 1997a,b; Kanal et al., 1994; Nouri et al.,  1996;). The use of d-MTBE was accepted by the
stakeholders as a way to assure that a reduction in MTBE can be demonstrated to be a result of microbial
                                              31

-------
                      o
                  GWT-1s'1d
                                    PROPANE
                             VMPT-2  STORAGE     24 V Power for
                      A TV 11       A             Solenoid Corttrol
                      %T,4  $T'5  JTIC.    0
                                                                       .' '. UTILITY POLE
                                                                  CONTROL PANE
               XXXXXXXXX
             X  X  X  X  X  X  X  X  X  X
        QQQGpOQQQ
       OIFM-1  OIPT ^   OIP! "*   OIPTJ  OiPT-S  OlPI^.  OIPT.,'  OIPT^!
                                                                                                99    99
                                                                                                                                             O
                                                                                                                                          GW(Ms'1d
                                                                                                                     ,    ...  .    ,   ...........
                                                                                                                     XXXXXXXXX
                                                                                                                    x  x  x  x   x  x   x  x   x  x
                                                                                                           "OOpOQQOQ
                                                                                                              QlPC 1  OlPC '2 OlPC )_O'^C-i  Oif]C-*i  Ol?C*  Cn^-.r OiPC-«
           BACTERIAL INJECTION
   .    /K    ^N   xK    >T^    JN    /f*,
 IPT-'  PIPT-i  PiPT '1  PIPT-1  PIPT-5  P1PT-0  PiPT-7
A      TV}. A  • V-'-5''     '  4r>'5-' avMPT.6
      T;"  O    •*•*'  O    J"3  O
                Arv.n       Arvi2
    0r:,.  o    »T12  o    •Ti3  O

    *T.f  O    •"?  O    •"!  O

    • TV  Q    0-52  O    •T''1  O

          O    •'«'  O    0T62

               Test  Plot
                                                                                                                            «c-"  O
                                                                                                                                  0
O    ••;-':'  O
0    •«->  0
                                                                                                                                  O    •'-'  0
                                                                                                                                         Control  Plot
 LEGEND
 •  EPA Groundwater Monitoring Clusters
       Well Screen Designation
          Shallow Screen «Sj
          Deep Screen  <0|
 O  Envirogen Groundwater Monitoring Well / Probe (GWT1)
 O  Oxygen Injection Point (OIPT1)
 X  Propane Injection Point (PIPT1)
 x  d-MTBE and Hahde Tracers Injection I
 A  Vapor Monitoring Probe (VMPT1)
	 Oxygen Distribution System
                                                               Well Sampling Code
                                                            «c-!ICl.«l.«*'3^	— M,lllsSof»-,
                                                          0             2
                                                                "~     "
                                                                  SCALE IN METERS
                                                          0
                                                                           10
                                                                  SCALE IMFEET
                                          Figure 3-1.  Test  and Control Plots Layout
(Reprinted from I'ertoinuiiiif Muniloriiiif nf fciiluiim'tl l»-Sitii Hiorcnifiliiilion <>l MTBK in (imiiin! ll'tiii'r . Draft Work I'lan. 2(1110. by Ann Kceley. SI'RD. I :S1:I'A.)

-------
                                                                  Metering
                                                                   Pump
 Compressor
Air line to-
operate pump
• Line discharge below
 top of water table
                                  • Discharge Irne
                                   below top of water table
                                  • Pump
                                  - Pump inlet
                                    Figure 3-2.  Tracer Circulation Well
 (Modified from Performance \f(tnitoring of Knfitint'ctf In-Sim Binrcniet/ftiliatt af A/77?/:' in Ground \\ulct
 Draft Work Plan, 2000, by Ann Kcclcv, SPRD, USI-PA.)
                                                   33

-------
  1/8" stainless steel
  tub ing
    • taw
                • Line discharge below
                 !op of water tabfe
                - Discharge line
                 below lop of wate* tabfe
             • Bladder pump rate ~ 100 mL/mmute
One air compressor supplies air to
 38 separate bladder pumps.

20 air hoses connect the air compressor
to 20 controllers.  (Each controller can
operate two separate pumps.)
                                                  A total of 38 poly tubing lines
                                                  supply air to the bladder pumps.
                                                  2-40 channel metering pumps to inject
                                                  tracer into 38 separate 2" wells
                                                  All 38 wells extend 24 ft. below
                                                  ground surface, screened 9' to 24', 2" I.D.
                    • Pump inlet
                                                                                               1.'8 stainless steel
                                                                                               lubing
 Test   Plot
                                         Control   Plot
                       Figure 3-3.  Tracer Circulation System Cross Section
(Modified from Pi'ifonnaticc Monitoring <>/ Enlnim-ccl lit-Situ liion'inctHiiliiin oI'MTBK in Ground l\'uti-r.
Draft Work Plan. 20(10. hv Ann Kcoltv. SPRD, US1-PA.)
                                                34

-------
degradation rather than other processes such as dilution (since biosparging activity could be displacing the
MTBE contaminated ground water vertically and/or laterally) (Borden et al, 1997; Bernauer et al., 1998;
Church et al., 1999a,b, and 2000; Hanson et al., 1999; Hardison et al., 1997; Jensen and Arvin, 1990; Mo
et al., 1999; Connell, 1994; Ronen et al., 1993; Schirmer et al.,  1999; Suflita and Mormile, 1993; Yen and
Novak, 1994; White et al., 1996). In addition, the tracer injection system continuously delivered d-MTBE
at approximately 1 mg/L to the biological barrier as a challenge material for the technology evaluation.

Ground-water tracers were used to establish the direction and velocity of ground-water movement. Two
halides, which were present at background quantities (i.e., bromide and iodide), were added at upgradient
locations using the 38 tracer circulation wells: bromide prior to the start of the treatment and the iodide, or
iodide and bromide after the on-set of the treatment. As previously described in Section 2.3, the
approximate concentrations of iodide and d-MTBE were 10 mg/L and 1 mg/L, respectively.

3.1.1   Test and Control Plot Design

The Test and Control Plots were placed within the Middle Zone, a portion of the aquifer impacted by
moderate levels of MTBE with no BTEX compounds. The placement of the plots enabled an assessment
of the technology as a biological barrier to the migration of MTBE from the upgradient source area.
Figure 3-1 depicted the configuration of each plot within the study area, the type and position of
monitoring points, the position of the vendor's injection system, and the placement of the tracer injection
system. The plots (monitoring network transects) were aligned perpendicular to the ground-water flow.
According to the site pre-characterization activities, ground-water gradients were determined to be in the
direction shown in Figure 3-1.  Each plot measures 30 feet wide by 40 feet long and they are separated by
approximately forty feet.  Both the Test Plot and Control Plot contained upgradient and downgradient
transect well clusters (Smith et al., 1991). For the evaluation study, only SPRD monitoring points were
sampled. Envirogen collected samples from their designed monitoring points.

For the Test Plot, there  were a total of six upgradient ground-water monitoring clusters located in a single
transect.  Each cluster contained one well screened near the  bottom of the aquifer (21" screen), one
screened in the middle of the saturated zone (6" screen), and one screened near the top of the water table
(21" screen).  Downgradient of the biosparging and tracer injection systems, there were a total of 14
ground-water monitoring clusters located along five parallel transects. Each cluster contained wells
screened near the bottom, middle, and the top of the aquifer. Each screen was 27".  The exact position of
                                               35

-------
the screens was determined based on vertical hydraulic conductivity profiling prior to installation (See
Figure 3-4, Well Construction Specifications).

For the Control Plot, there were a total of four upgradient ground-water monitoring clusters located in a
single transect and ten downgradient monitoring clusters located along three parallel transects. Transects
for the Control Plot did not necessarily align with similar transect numbers for the Test Plot. The well
screen locations for both the upgradient and downgradient were located as described for the Test Plot.

3.1.2   Monitoring Parameters

Although various parameters were measured during this performance validation study, the determination
of the MTBE/d-MTBE and iodide were more  significant in terms of their role as the critical
measurements in support of the project's primary claims. Nevertheless, all other listed analytes (i.e.,
TEA, acetone, 2-propanol, and their deuterated forms) were measured and were used collectively as
supportive evidence for the biodegradation potentials. All samples were collected as described in Section
4 and analyzed according to the procedures referenced in Table 4-1.

3.1.3   Sampling Approach

There were a total of fifteen sampling and analysis events.  The first three took place in the first month
after the addition of tracers, as described in the schedule in Section 2.3. The final sampling took place at
approximately 10 months (event 15) after the  initiation of treatment (Table 2-4 details the schedule for all
the other intermediate  events).

Selected wells from both the Control and Test Plots were sampled during each event (see PQA NRMRL
QA Number 119-Q12  and QAPP Appendix B for specifics). Various parameters were sampled and
analyzed during each event, as noted in subsequent sections of this document. Each of the screened depth
intervals in the well clusters were considered to be independent for this demonstration and were based on
the radius of influence during sampling which was a function of the ground-water velocity.

Based on the results of the November 2000 aquifer tests conducted by SPRD hydrogeologists within the
demonstration plot, the sampling plan called for the completion of an event in three days or less using a
pumping rate of 30 ml/min.
                                               36

-------

i







1

L j





1
18
r

I j



i
1^
r


\
i JL
4
V
10
r
I



fV *\
\ //// /
\ 1/8" color coded sampling /
tubing
I 6" screen
Formation allowed to collapse around ^^^
sampling points below water table. Sand -"""""^
backfilled around samplers above water table.

21" screen

' 6" screen

21 "screen
y
////k

i 6" screen
T i

27" screen
t
1
1
27" screen

27" screen

\

8' nominal
depth to water
table
r


Drawing not
o scale all
naterial



                           Upgradient
Down-gradient
           Note: vapor screen present at selected locations only
                              Figure 3-4.  Well Construction Specifications

(Reprinted from Performance Monitoring of Enhanced In-Situ Bioremediation of MTBE in Ground Water, Draft Work Plan,
2000, by Ann Keeley, SPRD, USEPA.)
                                                      37

-------
                                         SECTION 4
                          SAMPLING AND ANALYSIS PROTOCOL

The following section provides details on the procedures used to collect samples for the SPRD long-term
performance monitoring of the Envirogen demonstration.  The collection of ground-water samples for d-
MTBE and iodide was critical for the achievement of the project's technical objectives.

4.1    GROUND-WATER SAMPLING

As noted earlier (Section 3 and Figure 3-1), there are a series of ground-water monitoring well clusters in
the Test Plot as well as the Control Plot, both upgradient and downgradient of the oxygen (Control Plot)
and oxygen/propane and bacterial injection wells (Test Plot). In the Test Plot there are 6 upgradient wells
and 14 downgradient SPRD wells.  In the Control Plot there were 4 upgradient wells and 10
downgradient SPRD wells. These wells, constructed as detailed below, were sampled during  15 events for
a variety of parameters in accordance with the schedules provided in the following subsections.

4.1.1   Monitoring Well Specifications

The installation of monitoring wells and tracer injection wells was accomplished using a Geoprobe™ unit
and Cone Penetrometer Technology (CPT).  The upgradient wells were installed using a Geoprobe™ rig
while the downgradient wells were placed with the CPT.  Initially, 3.25" O.D. or 2.125" O.D. rods with
an expandable point were advanced to a predetermined depth. The monitoring well was assembled then
lowered inside the probe rods which were then retracted.  As the rods were retracted, the natural
formation was allowed to collapse around the well. Sand was used to backfill around the wells above the
water table with a six-inch bentonite plug placed at the surface. After installation, the wells were
developed by purging and mechanical surging following ASTM D 5521 "Standard Guide for
Development of Ground-Water Monitoring Wells in Granular Aquifers."

4.1.2   Low Flow Sampling

The primary limitations to the collection of representative ground-water samples include: disturbance of
the water column above the screened interval; re-suspension of settled solids at the base of the casing
(e.g., high pumping rates); disturbance at the well screen during purging and sampling (e.g., high pump
rates); and the introduction of atmospheric gases or degassing from the water (e.g., sample handling,

                                              38

-------
transfer, vacuum from sampling device, etc.). Based on these limitations, low-flow sampling protocols
were employed for this demonstration evaluation.

4.1.3     Well Purging

The purging of monitoring wells for the purpose of obtaining representative samples is necessary since
ground-water chemistry can be altered through contact with the atmosphere, well casing materials, screen,
and surface seal.  However, due to flow limitations, sample volume restrictions and the desire to obtain
samples with as little disturbance as possible, a flow-through cell to establish well stabilization was not
used. The purge volume for each well was 30 mis.  Low flow rates were used, both during purging and
sampling.

To achieve minimum disturbance to the formation, direct push technology was used to install the
monitoring points. Since the wells were completed using natural formation collapse, the screen was in
direct contact with formation water. Based upon the experiences of SPRD personnel at a similar site using
identical screen types, it was determined that pumping one pore volume would provide a representative
sample of the intrinsic ground water. A peristaltic pump was used for purging and sample collection.
After 30 ml had been purged, sampling was initiated. The  purge volume was based on purging 1.5 times
the well bore volume of the screened interval and the associated tubing.

4.1.4    Well Sampling

The ground-water monitoring wells were 1/8-inch diameter stainless steel with tubing connected at the
top of each for sampling. Based on the results of the November 2000 aquifer tests conducted by SPRD
hydrologists within the demonstration plot, the sampling plan called for the completion of a full sampling
event in three days or less using a pumping rate of 30 ml/min.  Therefore, approximately one liter of
water was collected from each well per sampling event at a flow-rate of 30 ml/min.

Due to concerns associated with the loss of VOCs, after the third sampling event, samples were collected
at 30, 50, and 90 ml/min to determine an appropriate sampling rate. It was determined that a sample rate
of 50 ml/min for the shallow and intermediate zones and 90 ml/min for the deep zone would be used for
the remainder of the demonstration.
                                              39

-------
In order to confine each sampling event to three days or less, sampling began at the line of wells farthest
downgradient from the injection wells then moved to the next upgradient line of wells. Samples were
taken first from the deepest ground-water horizon until all of the wells had been sampled at that location,
followed by the middle horizon, and finally the top horizon. This procedure minimized disturbances to
the flow field and negates artifacts imposed by the sampling process. A trip blank accompanied each
shipment of VOC samples to the laboratory.

Table 4-1 indicates the parameters and analytical methods used for determination of the listed analytes.
Due to the limitations in the amount of water that could be collected the bottles were filled in the
following order:

        1.  Ammonia
       2.  Alkalinity
       3.  Dissolved gases
       4.  VOCs (MTBE, TEA, 2-propanol, acetone and deuterated isotopes)
       5.  Iodide
       6.  Formaldehyde
       7.  TOC/DOC
       8.  Nutrients
       9.  Metals

When samples for specific analytes were not scheduled to be collected, the sample stream was delivered
to a waste container for that analyte and then redirected back to the next sample bottle after the
appropriate volume of water had passed.  Each water sample for VOC analysis was collected in two 40
milliliter volatile organic analysis (VOA) vials containing hydrochloric acid to acidify the sample to a pH
of less than 2.  The water sample was gently introduced into the sample containers to reduce agitation and
loss of volatile compounds. Each vial was filled until a meniscus appears over the top of the vial. The
screw-top lid with the septum (Teflon side toward the sample) was then tightened onto the vial.  After the
lid was tightened, the vial was inverted and tapped to check for air bubbles. If any air bubbles were
present, the sample was recollected.  For all other analytes, water was introduced directly into the
appropriate container, as listed in Table 4-1,  and the lid was tightened immediately after filling.  Field
duplicates and other quality control (QC) samples were collected immediately following collection of the
original sample. After collection, each water sample was stored on ice in a cooler until readied for
overnight shipment to the analytical laboratory.  An exception was the formaldehyde samples that were

                                              40

-------
immediately being picked up by a DelMar laboratory dispatcher. All sample collection procedures were
in accordance with the reference method listed in Table 4-1. Following sample collection, each sample
was labeled with detailed information regarding the location, date, and time of collection.  Chain-of-
custody procedures were followed from sample collection through sample analysis.

In addition to the designed analytes that were used for the evaluation of the technology's
performance within the context of this ITER, shortly after the completion of each EPA sampling
event, the Navy personnel conducted the following ground-water quality field measurements:
conductivity, sulfide, pH, Fe++, dissolved oxygen (DO), water table elevations, and temperature from the
selected Envirogen monitoring wells. The determination of these measurements involved purging
for stability to provide an insight as to the general quality of the aquifer.

4.2    TRACER INJECTION SYSTEM OPERATIONS AND MAINTENANCE

As discussed in  Section 3.1, the tracer injection system played an integral role in the operation of the
demonstration assessment investigation.  The 19 wells in both the Control and Test Plots were used in the
initial bromide tracer study to characterize ground-water flow paths and monitor tracer concentrations.
During the evaluation phase of the project, the wells were used to inject the non-conservative and
conservative tracers d-MTBE and iodide.

In order to establish that the proper function of the tracer injection and circulation system was maintained
during the entire evaluation process, SPRD and NBVC personnel performed routine maintenance work
prior to injecting the d-MTBE/iodide tracer solution as well as during and after the termination of the
project.  In addition to close-of-day observations of the tracer reservoirs and metering pumps, a
regimented operation and maintenance program included; multiple flow rate tests at the wellhead to
insure the proper function of the metering pumps in delivering an exact amount of tracer solution;
monthly replacement of the Tygon tubing and an inspection of each of the balder pumps; monthly
ground-water sampling for d-MTBE/MTBE, iodide; and measurement of circulation flow rate prior to and
after the termination of the project within the 38 injection wells. Water levels and geochemical
parameters were established prior to the start of the demonstration and at its conclusion. Periodically
performed tests  included the determination of water levels and dissolved oxygen in the injection wells. A
brief description of system maintenance, with an emphasis on activities prior to the system startup, is
provided below.
                                              41

-------
Prior to the long-term performance monitoring and tracer system start up, on May 30, 2001, ground-water
samples were collected to establish intrinsic MTBE and bromide background. Furthermore, to confirm
that the previously determined flow rate of 10 ml/well/day was being injected, a number of bench and
field-scale flow rate tests were conducted from June 4-8, 2001. During these tests, the collected
reservoir solution volumes were measured and the measurements were used to determine or adjust the
pump settings. The field testing flow rate was confirmed by setting the metering pumps on 2.9 - 3.0
revolution per minute (rpm).

On June 8, 2001, the pumps were shut off and downhole tubing was disconnected. After all lines to the
wellhead were filled with the tracer solution, two samples were collected, each from the Test and Control
Plots for d-MTBE and iodide analysis.  After the system adjustment, a 12 hours flow rate test was
conducted. During the test, one end of each tracer delivery line was inserted into a 10 ml VOA vial at the
wellhead, while the other end was connected to the metering pumps.  Each VAO vial was then secured to
the wellhead. The flow rate at the wellhead was determined based on the volume of tracer solution
accumulated (total of 38 vials). The proper final readjustments to the pump settings were made. The
above procedure was repeated  during a 4-hour rate measurement that resulted in the replacement of some
Tygon tubing. Based on the result of the multiple flow rate tests, final metering pump settings of 2.9 -
3.0 rpm was revalidated based  on the  volume of the tracer collected in the VOA vials. The tracer
reservoirs were then sampled for d-MTBE and iodide just prior to the start  of the injection  process.

On June 9, 2001, the SPRD long-term injection of tracer solution containing d-MTBE and  iodide was
initiated and continued during the entire demonstration project. During a follow-up system inspection on
June 10, 2001, the visual examination of the Test and Control Plot metering pump components concluded
that the system was not clogged.  The inspector recorded that the system was working properly after
pulling out and inspecting all of the tubing. The inspection of the submersible pumps and control also
were recorded as working properly.

At the  onset of the EPA critical sampling, Event 4, a 5-hour flow test was also conducted on July 16,
2001, to determine if the optimal tracer delivery rate was maintained. If not, the sampling event was to be
terminated. This test, which superseded the QAPP sampling, demonstrated that the precise volume of the
tracer solution was being pumped into every injection well. The volume collected from each of the wells
was 2 ml (±  100 |il) which is consistent with the projected volume. Therefore, the metering pumps were
operating correctly.

                                             42

-------
As stipulated by the field Technical System Audit (TSA), the flow rate of the tracer injection pump was
measured at the termination of the Envirogen demonstration.  In an attempt to document the rate of the
tracer injection at the wellhead, on March 12, 2002, after the completion of the QAPP sampling, a 12-
hour rate test was conducted.  It is noted that during this period, the tracer injection into the well bores
was interrupted, as discussed in Section 6.2.2.  As a result, 5 ml of tracer was collected at each well head
(± 100 - 200 |il). This indicated that the flow rate was producing the required 10 ml/day.
                                               43

-------
                                                 Table 4-1
                           Analytical Parameters and Method Requirements
Target
Analytes
MTBE/
d-MTBE (1)
TBA/d-TBA
(1)
2-propanol/
d-2-propanol
Acetone/
d-acetone
Nitrate/Nitrite
Sulfate
Phosphate
Ammonia
Alkalinity
TOC
DOC
Formaldehyde
(2)
lodide/Iodate
(3)
Metals (5)
Mercury
Type
(4)
C
NC
NC
NC
NC
NC
NC
NC
NC
C
NC
NC
NC
NC
NC
Method
SW846-
5030/8260B
SW846-
5030/8260B
SW846-
5030/8260B
SW846-
5030/8260B
EPA 300.0
EPA 300.0
EPA 300.0
EPA 350.3
SM 2320B
SW
846/9060
SW
846/9060
SW 846-
8315
EPA 300.0
SW846
3010/6010
CVAA 7470
Minimum
Volume
2 x 40 mis
2 x 40 mis
50 mis
100 mis
2 x 40 mis
2 x 40 mis
200 mis
2 x 40 mis
100 mis
100 mis
Preservation"
HCL to pH<2
None
H2S04topH<2
None
HCL to pH<2
None (6)
None
None
HN03topH<2
HN03 to pH<2
Holding Time
14 Days
2 Days
28 days (same
sample as
above)
2 Days (same
as above)
28 Days
14 Days
28 Days
28 Days
3 Days
(ext.)(2)
7 Days (3)
6 Months
28 Days
Analytical
Laboratory
ALSI
ALSI
ALSI
ALSI
ManTech
ManTech
ManTech
ALSI
ALSI
ALSI
ALSI
DMA
ManTech
ALSI
ALSI
Abbreviations:

ALSI: Analytical Services, Inc.
DMA: DelMar Analytical Services
DOC: Dissolved organic carbon
d-MTBE: Deuterated methyl tert-butyl ether
d-TBA: Deuterated terf-butyl alcohol
HCL: Hydrochloric acid
HNO3: Nitric acid
mis: milliliters
MTBE: Methyl ten-butyl ether
SW 846: Test Method for the Evaluation of Solid Wastes (EPA 1996)
TEA: tert-Butyl alcohol
TOC: Total organic carbon
Notes:
a)      In addition to the chemical preservation methods  indicated above, all  samples were  cooled to 4°C for
        shipment and storage.
(1)     Includes deuterated forms MTBE-d3 and TBA-d10, d-MTBE is only critical
(2)     Liquid-liquid (separatory funnel) was used for the extraction. Formaldehyde hold time is 3 days for
        extraction and then 3 days for analysis.
(3)     To ensure that iodide was not converted to iodate, every fifteen samples were analyzed for iodate.
(4)     C: Critical, NC: Non-critical
(5)     Al, Sb, Ba, Be, Cd, Ca, Cr, Co, Cu, Fe, Mg, Mn, Mo, Ni, K, P, Ag, Na,  and Zn were analyzed by Method
        601 OB and Hg by Method 7470A.
(6)     ALSI filtered/preserved the DOC samples from 2 x 40 mL unpreserved VGA vials.
                                                     44

-------
                                          SECTION 5
                         PRE-DEMONSTRATION INVESTIGATION

This section describes the use of a conservative tracer, bromide, to investigate the hydraulic properties of
the demonstration plots as well as the reliability of the SPRD tracer injection system to deliver a precise
low volume, high concentration of the tracer during the long-term application. After various rounds of
bench top and field rate measurements ranging from 4 to 12 hours in duration, on February 1, 2001, in
accordance with a temporary permit granted from California Water Quality Control Board, SPRD
conducted a bromide injection test for approximately one month. The setup and startup of the test was led
by SPRD personnel and the subsequent sampling and daily inspection of the tracer circulation and
injection system was conducted by the NBVC staff.  In order to determine the breakthrough curve as
early as possible, two vials were collected from each sampling location; one was  analyzed on site using an
ion-specific probe, while the  second was shipped to the SPRD laboratory in Ada, Oklahoma, for analysis.
Daily probe readings were used by the SPRD TPM to estimate breakthrough curve at various transects in
the Test and Control plots.

5.1     Bromide Tracer Test

The demonstration stakeholders agreed to implement a tracer circulation and injection system equipped to
operate in a passive mode, thereby mimicking the site's natural conditions as closely as possible.  That is,
the system was able to deliver a small volume of concentrated tracer solution under a natural gradient
through multiple injection points which were spaced in proximity with two rows  to induce a curtain in the
aquifer. Since the system operated under natural conditions, there was no change in the hydraulic head
distribution or geochemistry of the demonstration plots. Therefore, the information generated was a true
representation of the transient ground water.

To establish the background water quality parameters at the initiation of the test, the demonstration
showed that the plots were anaerobic with DO measurements within the injection wells being less than 1
mg/L.  The background bromide concentration was about 1 mg/L. During the course of the tracer test, the
upgradient wells were also measured routinely for the determination of the background bromide
concentration.
                                              45

-------
The test was formulated to add up to 10 mg/L, the amount permitted by the State of California, of
bromide ion to the receiving aquifer.  Sodium bromide was used in the test which was initiated on
February 1,2001.

As discussed in Section 2-3, the pre-demonstration bromide tracer test was successful in determining the
extent of continuity between the 38 upgradient tracer injection wells, oxygen and propane sites, and
downgradient observation wells, as well as the efficiency of the injection wells.  It was also successful in
defining the relative permeability of vertical and horizontal flow paths through the Test and Control Plots.
The criteria selected for demonstrating the appearance of bromide at a monitoring point above
background was 2.0 mg/L.

The first observation based on the results of the pre-demonstration bromide test was that the injection
wells operated as  designed. This was supported by significant bromide occurrences in both the nearby
oxygen and propane injection wells. In all of the 8 oxygen injection wells in the Test Plot and 6 of the 8
oxygen injection wells in the Control Plot, bromide concentrations in  excess of 2.0 mg/L were detected.
The propane injection wells in the Test Plot did as  well with "hits" in all seven wells. It is significant in
that these findings demonstrated that d-MTBE and tracers introduced  by the injection wells would be in
direct and constant communication  with the  vendor treatment gases.  The tracer injection system
delivered the proper concentration consistently and reliably for the duration of the injection period. Based
on the results of the pre-demonstration study, there was sufficient evidence that the system would operate
adequately to complete the QAPP.

The second observation concerns continuity between the injection wells and downgradient observation
wells in the Test and Control Plots. Although most bottom-screen wells received bromide concentrations
above the 2.0 mg/L concentration, the variation was significant.  It was also determined that bromide
tracer activity in the middle and upper zones was very limited. This finding was reflected by generally
low concentrations of intrinsic MTBE, suggesting that the natural ground-water flow at these locations
was limited.

It was important to characterize flow paths through the Test and Control Plots, particularly with respect to
the design of the sampling plan. One approach was to characterize the relative time of travel by
determining the initial tracer breakthrough time between the injection wells and downgradient points of
observation as shown in Table 5-1.  The distances downgradient from the injection wells to observation
                                               46

-------
points are provided in Table 5-1 only to obtain a relative sense of hydraulic conductivity. Since the times
provided are initial breakthrough values, they cannot be used to calculate the true ground-water velocities.
                                           Table 5-1
                              Initial Breakthrough Periods for
                              Downgradient Observation Points
Control Plot
Location
OIPC1
OIPC2
OIPC3
OIPC4
OIPC5
OIPC6
OIPC7
OIPC8







C21B
C22B
C23B
C24B
C31B
C32B
C33B
Distance
Feet
3
3
3
3
3
3
3
3







8.5
8.5
8.5
8.5
11
11
11
Breakthrough
Days
ND
8
6
13
6
6
14
ND







7
9
13
26
26
13
26
Test Plot
Location
OIPT1
OIPT2
OIPT3
OIPT4
OIPT5
OIPT6
OIPT7
OIPT8
PIPT1
PIPT2
PIPT3
PIPT4
PIPT5
PIPT6
PIPT7
T21B
T22B
T23B

T31B
T32B
T33B
Distance
Feet
3
3
3
3
3
3
3
3
6
6
6
6
6
6
6
8.5
8.5
8.5

11
11
11
Breakthrough
Days
20
19
26
13
6
13
4
17
48
26
19
15
29
17
19
35
9
33

41
29
41
       Note: ND - Non-detect.

The data in Table 5-1 demonstrate the heterogeneity of the various flow paths and that tracer
breakthrough times in the Control Plot are lower than those in the Test Plot. However, the data further
illustrate that the hydraulic communication between the injection wells, vendor's treatment gases, and
downgradient treatment zone and observation points is adequate for evaluating the technology.
                                               47

-------
Another finding of importance to the design of the sampling plan was the vertical distribution and
frequency of bromide detection over 2.0 mg/L. Between February 1, 2001, and March 30, 2001, 586
samples were analyzed for bromide in the Control Plot.  Of these, 124 were 2.0 mg/L or greater in bottom
screens and 19 were 2.0 mg/L or greater in the middle and upper screens with the most frequent of these
being 9 at location C21Y. During the same period, 672 bromide analyses were made in the Test Plot of
which 111 were 2.0 mg/L or greater in the bottom screens and only 4 were 2.0 mg/L or greater in the
middle and upper screens.

The most significant finding of the pre-demonstration bromide tracer test was that ground-water flow was
primarily confined to the bottom of the aquifer. This allowed the sampling plan for the evaluation
demonstration to be expanded from the original 7 sampling events to 15 sampling events, within budget
limitations, thereby strengthening statistical confidence in the projects results.

Although the bromide tracer injection was halted  on February 28, 2001, the high frequency of sample
collection continued until March 30, 2001. The purpose of this portion of the investigation was to
observe the tracer to return to background. The sampling for bromide was conducted on two other
episodes prior to the start of the long-term monitoring, once on May 30, and the second time on August 1,
2001. It is noted that for the duration of the test (February 28, 2001 - March 30, 2001), over 5000
samples were analyzed by ManTech, a SPRD on-site analytical contractor.
                                              48

-------
                                         SECTION 6
                        TREATMENT EFFECTIVENESS - RESULTS

This section describes the results of Envirogen's demonstration evaluation at Port Hueneme National
Environmental Test Site. Section 7 is organized to discuss and conclude the technology vendor's
effectiveness against the project's objectives.

6.1    DEMONSTRATION OBJECTIVES AND APPROACH

The primary objective of the demonstration was to determine if biodegradation is occurring in the Test
Plot to the extent that MTBE is remediated at or below 5 |ig/L. The approach was to monitor Test and
Control Plots for a period of 38 weeks (June 2001 - March 2002) and make appropriate analyses as
outlined in the project PQA to determine if the objective had been met.

During the pre-demonstration investigation (February 1-28, 2001), all 38 injection wells were sampled 15
times for bromide analysis.  Although there were differences between the bromide concentrations within
the various injection wells, due in large measure to variations in hydraulic conductivity, the average
concentrations within the Test and Control Plots were remarkably equal.  The Test Plot had an average
bromide concentration of 51.9 mg/L (STDEV = 10.8) while the Control Plot had an average concentration
of51.0mg/L(STDEV= 10.9).

During the demonstration phase of the project the injection wells  were also sampled frequently for iodide
and d-MTBE. Although variations in concentrations between individual injection wells were observed, as
during the bromide test, averages over the duration of the project  were very similar.  The average iodide
concentration in the Test Plot injection wells was 30.2 mg/L (STDEV = 7.9) while that in the Control Plot
was 31.2 mg/L (STDEV = 9.4).  The results of d-MTBE sampling demonstrated similar behavior with an
average concentration of 3,217 |ig/L (STDEV = 382) in the Test Plot, while that of the Control Plot was
2,969 ng/L (STDEV =188).

6.2    DEMONSTRATION PROCEDURES

Conservative tracers were introduced into the aquifer by a series of injection wells to determine aquifer
flow paths in the Test and Control Plots. Deuterated MTBE (d-MTBE) was also introduced through the
injection wells to avoid possible complications resulting from variations in the intrinsic MTBE.  The
                                             49

-------
evaluation procedure involved sampling the Control and Test Plots at upgradient and downgradient
monitoring wells with screens located at the top, middle, and bottom of the aquifer.  Analyses were also
made to determine the presence of degradation (daughter) products, and geochemical parameters to
evaluate changes expected due to the biodegradation processes.

6.2.1   MTBE Reduction

The major parameter in evaluating the technology demonstration is MTBE. Understanding its behavior
before and during the tenure of the test is critical to evaluating the effectiveness of the enhanced in-situ
bioremediation of MTBE. For example, samples taken from 5 monitoring wells near the east fence and 5
monitoring wells on the west fence surrounding the EPA plots on October 4, 2000, indicated that MTBE
concentrations across the Test and Control Plots were varied, as shown in Figure 6-1.
      Figure 6-1. MTBE Concentration in the Vicinity of the Envirogen Site on October 4, 2000
                                              50

-------
On November 11, 2000, roughly five weeks later, the same wells were sampled again for intrinsic MTBE
with the results shown in Figure 6-2. The MTBE concentration throughout the test area was reduced by
about 500 |lg/L.  It is also noted that again, the Control Plot is roughly 2,000 |ig/L MTBE higher than the
Test Plot and that the downgradient area of the Test Plot is significantly lower in MTBE concentration
than upgradient areas.
     3   <°oo.
  Figure 6-2. MTBE Concentration in the Vicinity of the Envirogen Site on November 11, 2000
This observation can be supported by comparing the average bottom screen MTBE concentrations in all
of the upgradient and downgradient wells in the Test and Control Plots, as shown in Figure 6-3. This
figure is comprised of both Envirogen and EPA data. For well locations, see Figure 3-1.
                                              51

-------
                                     Bottom Screen MTBE
                                                                               - Down Test
                                                                               -Up Test
                                                                                Down Control
                                                                                Up Control
       11/20/00   1/9/01   2/28/01   4/19/01   6/8/01   7/28/01   9/16/01   11/5/01  12/25/01   2/13/02    4/4/02
                                       Date
       Figure 6-3. The Average Deep Screen MTBE Concentrations in the Test and Control Plots

As shown in Figure 6-3, on 01/09/01 the four locations contained relatively high concentrations
including: downgradient Test Plot at 5,329 |lg/L; upgradient Test Plot at 4,900 |lg/L; downgradient
Control Plot at 5,989 |ig/L; and upgradient Control Plot at 4,800 |ig/L.  When the evaluation test period
began on June 14, 2001, the downgradient Test Plot was at 1,493 |ig/L; upgradient Test Plot at 2,160
|lg/L; downgradient Control Plot at 3,471 |lg/L; and upgradient Control Plot at 4,580 |lg/L. The order of
increasing intrinsic MTBE concentrations reflected in Figure 6-3 is downgradient and upgradient Test
Plot followed by downgradient and upgradient Control Plot. This order is fairly well mirrored in Figures
6-1 and 6-2.

The injection wells in both the Test and Control Plots, which are upgradient from the treatment zone,
were also sampled for MTBE throughout the period of the demonstration evaluation. The results from
those analyses also confirm that nascent ground water entering the treatment zone continued to decrease
during the evaluation. For example, in the Test Plot injection wells the average  MTBE concentration
decreased from 1,102 |ig/L on  July 18, 2001, to 280 |ig/L on March  12, 2001. During this same period,
the average MTBE concentration in the Control Plot injection wells  decreased from 2,841 to 1,410 |lg/L.
                                               52

-------
Variations in the intrinsic MTBE concentrations at the bottom monitoring well screens can also be
depicted by downgradient columns such as T23B, T33B, T43B, T53B, and T62B as well as C23B, C33B,
and C42B. For example, the average MTBE concentration for each sampling event at the three Test Plot
downgradient columns, whose first wells are T21B, T22B, and T23B, are shown in Figure 6-4.
    o
    o
    O
    W
    PQ
    H
                               MTBE by Columns in Test Plot
-T21B
-T22B
 T23B
                                           Date
                    Figure 6-4. MTBE by Flow Paths (Columns) in Test Plot
Similarly, the average intrinsic MTBE concentration for each sampling event at the four Control Plot
downgradient columns, whose first wells are C21B, C22B, C23B, and C24B, is shown in Figure 6-5.
                                            53

-------
                              MTBE by Columns in Control Plot
                                       Date
                Figure 6-5. MTBE by Flow Paths (Columns) in Control Plot
6.2.2   d-MTBE Reduction

Although MTBE concentrations upgradient and downgradient of the treatment zone were evaluated in
both the Test Plot and Control Plot, a focus of the evaluation technology was on the fate of deuterated-
MTBE (d-MTBE) added to the system.  d-MTBE was used as a non-conservative tracer in part to avoid
possible uncertainties resulting from fluctuations in intrinsic MTBE concentrations. The use of d-MTBE
also could provide evidence of biodegradation by tracking the generation of d-MTBE daughter products.
For this demonstration the deuterated daughter products that were tracked included acetone-d6, 2-
propanol-d6,d8, and fert-butyl alcohol-d9,dlO. Although the presence of formaldehyde was tested, it was
not possible to distinguish between deuterated and non-deuterated formaldehyde. Therefore, the
generation of this daughter product will be representative of total formaldehyde.

Alterations in d-MTBE resulting from the demonstration can be considered in various ways by evaluating
changes in concentration upgradient and downgradient in the Test and Control Plots, and in downgradient
columns (i.e., T23B, T33B, T43B, T53B, T62B and C23B, C33B, and C42B) over the period of the 15
sampling events. Again, the evaluation  of results is confined to the bottom screens because of the
inactivity of the middle and upper screens.
                                              54

-------
For example, the average d-MTBE concentration for each sampling event at each of the three distinct

flow paths in the Test Plot referred to as downgradient columns, whose first wells are T21B, T22B, and

T23B, is shown in Figure 6-6. As demonstrated in other tracer tests, the T23B column is the most active

followed by T22B and T21B. It should be pointed out that some of the fluctuation in d-MTBE averages

is believed to be caused by the eight brief occasions when the injection system was not operating.


The following is a sketch of eight occurrences when the tracer injection system was inoperative:
       •      June 29, 2001 - down time was for 5 days only in the Control Plot due to operator failing
              to turn on the Control Plot metering pump.

       •      July 16, 2001 - down time was 5 hours due to a short pre-scheduled power outage for
              NBVC Port Hueneme Site and the performance of a 5-hour tracer injection flow-rate test.

       •      July 21, 2001 - down time 8 days Test Plot only due to operator failing to open the tracer
              reservoir valve.

       •      July 29, 2001 - down time was 3 hours due to a pre-scheduled power outage for NBVC
              Port Hueneme Site.

       •      November 26, 2001 - down time 24 hours caused by inability to locate two d-MTBE
              ampules which were available inside the refrigerator at the EPA shed.

       •      February 2, 2002 - down time 48 hours due to power outage caused by a storm.

       •      February 9, 2002 - down time 48 hours due to power outage caused by a storm.

       •      March 6, 2002 - down time 5 days because of power interruption at the  Base during the
              weekend. However, the operator failed to turn on the metering pumps.


Although these unfortunate down times resulted in a short interruption of the tracer events, it was
observed that the tracer wells cleared quickly indicating they were free from obstructions, and recovered

quickly indicating that the tracer injection systems operated as designed.
                                             55

-------
  00
  6
  g
  O
  PQ
  H
                            d-MTBE by Columns in Test Plot
                                       Date
 T21B
 T22B
 T23B
                   Figure 6-6. d-MTBE in Downgradient Columns of Test Plot

Similarly, the average d-MTBE concentration for each sampling event at the four Control Plot
downgradient columns, whose first wells are C21B, C22B, C23B, and C24B, is shown in Figure 6-7.
     1000	
  00
  6
  o
  O
                           d-MTBE by Columns in Control Plot
C21B
C22B
C23B
C24B
                                       Date
                 Figure 6-7. d-MTBE in Downgradient Columns of Control Plot

                                          56

-------
Again, as demonstrated by other tracer studies, the C23B column is the most active, followed by C22B,
C21B, and C24B (Figure 6-7). In addition to evaluating d-MTBE concentration changes over time along
flow paths in the Test and Control Plots, it is useful to compare the average of all downgradient bottom-
screen d-MTBE concentrations over the 15 sampling events.  In a way, this is like evaluating changes in
the total downgradient d-MTBE mass over time in both the Control and Test Plots. As shown in Figure
6.8, the least squares fit in both the Control and Test Plots indicates that downgradient d-MTBE
concentrations increased over the study period at about the same rate with those in the Control Plot being
somewhat higher.

It was noted that d-MTBE was detected at low levels in the upgradient monitoring wells. Table 6-1
describes the extent to which d-MTBE was detected in the upgradient  Control and Test Plots.  It is noted
that the determination of MTBE, d-MTBE was accomplished by the analysis of collected samples using
GC/MS methodology with reporting limits (minimum quantitation limit) of 1 |lg/L.  Consequently, the
numbers below 1 |ig/L are estimated values and have no bearing on the evaluation of project objectives.
                                              57

-------
                             Table 6-1
       Detection of d-MTBE in Upgradient Monitoring Wells
Control Plot
Well
C13B


C14B













Sample
Event
6
13

3
7
13











Cone.
UB/L
0.7
0.5

0.4
0.1
0.4











Test Plot
Well
TUB





T12B
T13B


T14B

T15B
T16B



Sample
Event
2
4
6
7
9

9
2
4
9
4
9
9
3
4
7
9
Cone.
Ug/L
0.19
1.2
0.2
0.3
1.9

0.5
0.22
0.7
0.4
0.4
0.3
0.2
0.3
0.2
0.1
0.2
Note:
Location and designation of well screens are provided in Figure 3-1.
Abbreviations:
C: Control
T: Test
B: Deep Screen
                                58

-------
                                      Downgradient d-MTBE
                                                  Date
            Figure 6-8. Downgradient d-MTBE Concentration in Control and Test Plots
6.2.3   Daughter Products

An indirect way to assess biodegradation processes is to determine the quantity of MTBE and d-MTBE
daughter parameters produced which must be directly associated with the reduction in mass of the
contaminant of concern.  During the processes involved in the biodegradation of contaminants,
degradation or daughter products are created. If the process proceeds to the mineralization endpoint, the
daughter products themselves will be further remediated until only CO2 and water remain.

During the demonstration evaluation, one would expect daughter product masses to be commensurate
with MTBE and d-MTBE mass reduction to the extent that the remediation process was effective in the
downgradient Test Plot.  It would also be expected that the production of daughter products in the
downgradient Test Plot would be significantly higher than in the downgradient Control Plot.

The results of the 15 sampling events are summarized in Table 6-2 for the Control Plot and Table 6-3 for
the Test Plot. It should be noted that these data refer only to those samples collected at the deep screens
since, as mentioned before, little activity was observed  in the upper and middle zones of the aquifer.
                                              59

-------
Examples of detections in the middle and upper screens (not reflected in Tables 6-2 and 6-3) demonstrate
that the highest average value of TEA over the 15 sampling events in the Control Plot was 111 |ig/L
(C12Y-middle screen) followed by 73 |ig/L (Cl lY-middle screen). The remainders of the screens were
below 40 |ig/L and most were non-detectable (ND).  TEA concentrations in the Test Plot were generally
lower with the highest average  15 sampling event value being 59 |ig/L at T32Y (middle  screen).  In
addition to TEA, low levels of other daughter products were detected at five medium and shallow screens.
For example, at T21R 8.1 |ig/L acetone (Event 15) and 6.8 |ig/L 2-propanol (Event 12) were detected.
Low levels of acetone were also detected at T31R (upper screen), T33Y (middle screen), T33R (upper
screen), and T51R (upper screen).

As shown in Tables 6-2 and 6-3, which represents only bottom-screen values, many of the reported
concentrations were very low (e.g., less than the practical quantitation limit and /or method detection
limit). Therefore, in order to calculate the descriptive statistics presented in Tables 6-2 and 6-3, these low
values were replaced with the method detection limit (MDL) for the parameters under consideration.
These detection limits included acetone/d-acetone, 10 |ig/L; 2-propanol/d-2-propanol, 4-20 |ig/L;
formaldehyde, 10 |ig/L; tert-butyl alcohol-d9 and -dlO,  10 |ig/L; fert-butyl alcohol, 4 |ig/L.

Three Injection Wells in the Test Plot (PI, P8, PI6) and in the Control Plot (P22, P28, P32) were also
sampled and analyzed for suspected daughter products.  Although these locations are upgradient  from the
treatment zone in each plot, the d-TBA average concentration over the 15 sampling events for these
injection wells was 125 |lg/L in the Test Plot and 168 |lg/L in the  Control Plot.
                                               60

-------
                                               Table 6-2
                                  Daughter Products in Control Plot
Target Analytes
Acetone
Acetone -d6
2-Propanol
2-Propanol-d6,d8
Formaldehyde
t-ButylAlcohol-d9,dlO
tert-Butyl Alcohol
All values are |J.g/L
Upgradient Control Plot
Mean
N.D.
N.D.
N.D.
N.D.
N.D.
N.D.
105

STDV



29

High



399

Low



13

Downgradient Control Plot
Mean
N.D.
N.D.
N.D.
N.D.
N.D.
25
63

STDV


10
46

High


237
348

Low


N.D.
N.D.

Average of bottom screens over 1 5 sampling events.
                                               Table 6-3
                                    Daughter Products in Test Plot
Target Analytes
Acetone
Acetone -d6
2-Propanol
2-Propanol-d6,d8
Formaldehyde
t-ButylAlcohol-d9,dlO
tert-Butyl Alcohol
All values are |J.g/L
Upgradient Test Plot
Mean
N.D.
N.D.
N.D.
N.D.
N.D.
N.D.
29

STDV



9

High



97

Low



N.D.

Downgradient Test Plot
Mean
10
N.D.
N.D.
N.D.
N.D.
29
29

STDV


13
29

High
11

215
290

Low
N.D.

N.D.
N.D.

Average of bottom screens over 1 5 sampling events.
Abbreviations:
STDV:  Standard Deviation        N.D.: Non Detect           ug/L: microgram per liter

Note:  The target analytes detection limit and PQLs are described within the text. See Section 6.2.3
                                                   61

-------
6.2.4   Water Quality Measurements

An indirect approach in evaluating remediation effectiveness is the assessment of alterations to ground-
water geochemistry resulting from biodegradation processes. Both the bacterial requirements for growth
and respiration, as well as degradation products, alter many intrinsic geochemical parameters.  The
requirements include nutrients and sources of energy while the degradation products include
mineralization end points.

In this case the assessment can be made between upgradient and downgradient parameter concentrations
within the Test Plot as well as comparisons between the Test Plot and the Control Plot. The following
parameters were selected to reflect geochemical alterations that might occur during the demonstration.

       •   Alkalinity is expected to increase due to the production of mineralization end products
           including carbonate ions;
       •   Electron  donors and nutrients including ammonia-nitrogen, nitrate and nitrite, phosphorus,
           orthophosphate, and sulfate are expected to be reduced in concentration after utilization by
           microbes; and
       •   Total and dissolved organic carbon (electron donors). Usually the mass of the electron donor
           compounds needed to stimulate bacterial growth is necessarily much larger than the mass of
           the contaminant being degraded.

The results of the ground-water geochemical analysis are presented in Table 6-4 for the Control Plot and
Table 6-5 for the Test Plot. The information is comprised of the average parameter concentrations at the
bottom screens as determined by the results of the 15 sampling events. The information is further divided
into upgradient and downgradient locations with respect to the treatment transects in each plot.
                                               62

-------
                                                   Table 6-4
                            Water Quality Measurements in Control Plot
Target Analytes
Alkalinity
Ammoni a-Nitro gen
Nitrate+Nitrite
Phosphorus, Total
TOC
TOC Dissolved
Nitrate
Nitrite
Orthophosphate
Sulfate
All values are mg/L
Upgradient Control Plot
Mean
533
0.55
0.13
0.1
3.3
3.0
0.3
0.32
0.02
1132

STDV
22
0.24
0.14
0.12
0.1
0.1
0.23
0.04
0
101

High
558
0.79
0.29
0.24
3.4
3.1
0.48
0.37
0.02
1241

Low
519
0.3
O.05
O.02
3.2
o
J
O.05
O.05
O.02
1041

Downgradient Control Plot
Mean
502
0.56
0.10
0.2
3.5
3.3
0.22
0.26
0.02
1167

STDV
31
0.21
0.12
0
0.4
0.3
0.28
0.22
0
37

High
544
0.76
0.44
0.2
4.1
3.8
0.69
0.59
0.02
1217

Low
452
0.3
O.05
0.2
2.8
2.7
O.05
O.05
O.02
1134

Average of Bottom Screens Over 1 5 Sampling Events.
                                               Table 6-5
                              Water Quality Measurements in Test Plot
Target Analytes
Alkalinity
Ammoni a-Nitro gen
Nitrate+Nitrite
Phosphorus, Total
TOC
TOC Dissolved
Nitrate
Nitrite
Orthophosphate
Sulfate
All values are mg/L
Upgradient Test Plot
Mean
485
0.89
0.06
0.08
3.3
3.0
0.05
0.56
0.02
1179

STDV
22
0.07
0.05
0.06
0.2
0.3
0.0
0.3
0.0
118

High
509
0.97
0.14
0.13
3.6
3.6
0.05
0.81
0.02
1300

Low
451
0.82
0.05
0.02
3.1
2.8
0.05
O.05
O.02
1016

Downgradient Test Plot
Mean
437
0.57
0.16
0.02
3.6
3.3
0.3
0.1
0.02
1189

STDV
34
0.28
0.15
0.0
0.3
0.3
0.3
0.1
0.0
119

High
478
1.08
0.51
0.02
4.4
4.2
1.17
0.59
0.02
1217

Low
475
0.3
0.05
0.02
2.8
2.7
0.05
O.05
O.02
1103

Average of Bottom Screens Over 1 5 Sampling Events.
Abbreviations:
STDV:   Standard Deviation
mg/L: milligram per liter
Note:
The numbers above detection limit and below practical quantitation limit are reported as less than (<).
                                                  63

-------
As shown in Tables 6-4 and 6-5, many of the reported concentrations were very low. In addition,
parameter concentrations were often reported as less than practical quantitation limit (
-------
Although these sparging events only last about 5 minutes and occur only 4 times a day, the natural
ground-water gradient of about 0.002 is increased orders of magnitude resulting in the detection of tracers
in the upgradient monitoring wells and causing considerable disruption to the natural ground-water flow
field and dispersal of the injected tracers. For example, the water in the injection wells was anaerobic
before the project began, and contained high concentrations of oxygen thereafter.  Shortly after the
termination of the injection of gases, the oxygen concentration dropped significantly.  For example, DO
measurement of the injection wells during the last QAPP sampling event (March  11, 2002) indicated that
14 out of the 19 Test Plot injection wells had concentrations >15 mg/L and 7 out of 19 injection wells
within the Control plots had concentrations of >15 mg/L.  The last oxygen measurements conducted on
April 30, 2002, indicated that 10 out of the  19 Test Plot injection wells were below 3 mg/L and 11 out of
the 19 Control Plot injection wells were below 1 mg/L. In any event, these mounds caused considerable
disruption to the natural ground-water flow paths.
                                               65

-------
            Decembers, 2001 Water Levels, Static Levels
            Test  Plot
                    OIPT-1
11874
11872
11870^
11868-
11866-
11864-
11862-
11860-
11858
11856
                 MW
                              ffi     8.82
                             8.81
    MW BIPT-1  +       *
           MWOIPT-2

MW PIPT-1
    8836812   6814   6816   6818   6820   6822   6824   6826   6828   6830   6832
                    Figure 6-9. Static Water Levels in Test Plot
                                  66

-------
11874
11872
11870
11868-
11866-
11864
11862
11860
11858-
11856-
         December 5, 2001 Water Levels Time = 11:58:17
         Maximum Water Levels During 1st Sparge Event
         Test Plot
                                           MW PJPT-7
   9186812  6814   6816   6818  6820   6822   6824  6826   6828  6830   6832
              Figure 6-10. Maximum Water Levels in Test Plot
                                 67

-------
     December 6,  2001  Water Levels, Static Levels
     Control Plot
11830
11825-
11820
     6810
6815
6825
6830
          Figure 6-11. Static Water Levels in Control Plot
                           68

-------
 December 6, 2001 Water Table Time = 09:17:30
 Maximum Water Levels During 1st Sparge Event
 Control Plot
11830
11825
11820
11815-
1181D
11805
    6810
6815
6825
6830
       Figure 6-12. Maximum Water Levels in Control Plot
                       69

-------
    Figure 6-13. Pictures of Water Spouts at the Surface Through
Monitoring Wells.  GWC 3D - Envirogen deep screen in downgradient
  center of first transect in Control Plot (top).  T14M - EPA middle
       screen in upgradint transect in Test Plot (bottom).
                              70

-------
                                         SECTION 7
                     TREATMENT EFFECTIVESNESS - CONCLUSIONS

This section addresses the statistical analysis of the results of the demonstration of the Envirogen
technology at the NBVC in Port Hueneme, California, and describes the effectiveness of the technology
in treating ground water contaminated with MTBE and other gasoline constituents. The technology
demonstration was implemented and evaluated in one phase at the Middle Zone within the MTBE plume
over a ten-month period, as shown in Table 2-4.

The EPA performed an independent evaluation of Envirogen's propane biostimulation technology
through a joint effort between the National Risk Management Research Laboratory's (NRMRL)
Subsurface Protection and Remediation Division (SPRD) and the Innovative Technology Evaluation
Program. Although SPRD led the technical design and the performance of the evaluation process, each of
the project stakeholders approved the SPRD-developed Work Plan entitled "Performance Monitoring of
Enhanced In-Situ Bioremediation of MTBE in Ground Water, 2000," and reviewed its Quality Assurance
Project Plan, SAIC, 2001, companion document.  California Water Quality Control Board (WQCB)
granted a project permit through a public hearing and NFESC and SPRD worked cooperatively to staff
the field sampling crews and to manage the evaluation. Prior to the implementation of the field
demonstration, the project PQA was approved by Envirogen (May, 2001).

7.1     BACKGROUND

As discussed in the previous sections (Section 5 and 6), the conceptual model to approach the evaluation
process was to employ ground-water tracers and a surrogate tracer to determine the efficacy of the
technology performance. In response, the pre-demonstration bromide tracer study was implemented
under a passive system to inject low volume, high concentration of a bromide tracer solution under the
natural gradient and anaerobic conditions prior to the operation of the Envirogen technology.  The essence
of the tracer study was to evaluate the intrinsic flow velocity, and communication of the various
components of the system including injection wells, downgradient monitoring wells and the vendor's
treatment gases injection points.

The second segment of the tracer injection, carried out during the evaluation process, was conducted
under an  active aerobic system resulting from the  injection of treatment gases.  The essence of the study
was to avoid the influence of mounding and diversion potentials and only select the monitoring points

                                             71

-------
that are intercepted by the flow lines. The selection of d-MTBE as a surrogate for intrinsic MTBE was
made to reduce the background fluctuations since biodegradation processes have the potential to be
sporadic in nature. Similarly, in order to avoid the potential chaotic behavior that may result from air
sparging, the selection of a conservative tracer alleviates the screening process thereby marking the flow
paths between the tracer injection system and monitoring wells downgradient from the treatment gases.  It
should be noted, however, that since the tracer studies were representative of two distinct environmental
conditions, passive and anaerobic as well as active and aerobic, their results cannot be readily compared.

7.2    PERFORMANCE ANALYSIS

The project participants agreed that the main focus of the EPA evaluation should be to determine the
behavior of intrinsic MTBE and the tracer d-MTBE.  The latter involved the iodide/d-MTBE ratio
discussed in Section 2.3.1, which was proposed to differentiate between abiotic and biotic reduction, as
well as provide the definition of qualified wells for analyses.

Of considerable importance in addressing these issues is the performance of selected conservative and
non-conservative tracers. The Work Plan identified the use of iodide as a conservative tracer in the
demonstration evaluation phase of the project because of its low background of approximately 20 |ig/L as
compared with bromide of approximately 1 mg/L, to avoid bromide residuals that could be present
following the pre-demonstration tracer test, and its widespread application as a ground-water conservative
tracer.

During the  evaluation phase of the project, as was evidenced and previously described in the bromide pre-
demonstration results (Section 5), intrinsic MTBE and d-MTBE fluctuated in time and locations within
the Control and Test Plots. Also, the behavior of the iodide tracer, with respect to characteristics of the
earlier bromide tracer (which increased in concentration throughout the test period) was evidenced in
essentially four ways:
               1.      Iodide appeared to duplicate the earlier bromide results,
               2.      Iodide had a protracted delay in appearance in downgradient wells compared to
                      that of bromide,
               3.      Iodide would increase in concentration followed by a concentration reduction,
                      and,
               4.      Iodide remained at undetected levels while the earlier bromide concentrations
                      attained and remained at various concentrations until being reduced after
                      injection ended.
                                               72

-------
In order to determine the presence of iodate, the most abundant species in brackish water, as was
stipulated by the QAPP, during the first three sampling events for iodide every sample was also analyzed
for iodate but it was never detected. This frequency was then reduced to 1 out of every 15 samples during
sampling events 4-15 with no detection.

It was also of interest to insure that the presence of other chemical species of iodide were determined.
Therefore, selected samples from the locations which historically have shown high bromide
concentrations were submitted to a laboratory to be analyzed for total iodine by ICPMS. In order to
confirm the stability of the samples, the same samples were reanalyzed for iodide and iodate. The results
have shown that (1) all of the samples were non-detect for iodate, (2) the same concentrations of iodide
resulted from the reanalyzed samples, and (3) a good correlation was evident between iodide and total
iodine.

In an attempt to determine the extent of ground-water flow alteration by the treatment system, a second
bromide tracer test was started on October 29, 2001, which was carried out according to the pre-
demonstration bromide tracer specifications. When compared, the October 29 tracer results  appeared to
have some of the same inconsistencies as those encountered when using iodide.

As was pointed out earlier, the original bromide tracer test was carried out prior to the initiation of the
remediation demonstration when the natural aquifer system was not disturbed by treatment gases, as
discussed in Section 4. It may be possible that this change in the natural flow system contributes to
alterations in tracer behavior. In support of this argument, it appears that 8 to 10 of the bottom screen
wells increased in iodide concentration after the treatment gases had been turned off.  Furthermore, the
injection of iodide continued until May 30, 2002, which was over 2  !/> months after the treatment system
was discontinued.

7.2.1   Qualified Monitoring Points

The approved Pre-Quality Assurance Project Plan Agreement (PQA), May 2001, documented the
statistical justification and confidence levels associated with the determination of the number of critical
samples for the analytes of concern. Project participants agreed that these samples represented the
experimental units for the evaluation of the primary objective.
                                               73

-------
To that end, each screen where iodide was detected at 500 |ig/L or greater (qualified monitoring well) was
located along with the corresponding d-MTBE concentration. This information for both the Control and
Test Plots is provided in Table 7-1.  It was determined that 93 qualified wells were in the Control Plot
and 54 were in the Test Plot.

7.2.2  Statistical Analysis of Results

The objective of this data examination is to perform a statistical analysis on the demonstration evaluation
d-MTBE data to determine if the bioremediation process (injecting propane, oxygen, and propane
oxidizing bacteria) has reduced d-MTBE concentrations in the treatment plot. The effectiveness of the
demonstration is determined by evaluating whether d-MTBE levels in the downgradient well samples of
the Test Plot are at or below 5 |ig/L over a 10-month period using one-sided hypothesis test on mean
(80% UCL).  This degradation is established by measuring d-MTBE concentrations in the "qualified
samples" and determining whether, with 80% confidence, the estimate of the population mean is at or
below 5 |ag/L.

Data Analysis

Iodide provides evidence of ground-water flow in downgradient sampling wells. d-MTBE data are
evaluated only for "qualified"  monitoring points where iodide concentrations are greater than the practical
quality detection limit, 500 |ig/L.  As specified in the PQA, sampling data from events 4 through  15 are
used for evaluation.  Based on this data selection criteria, there are 93 and 54 d-MTBE "qualified
samples" in the Control Plot and in the Test Plot, respectively (Table 7-1). The d-MTBE data are  neither
described by normal distribution nor by log-normal distribution (Figures 7-3 and 7-4). However,  the
square-root transformed d-MTBE [sqrt(d-MTBE)] are well described by normal distribution (Figures 7-1
and 7-2). Therefore, the results in the following are obtained from the statistical analysis of square-root
transformed data of d-MTBE.
                                              74

-------
       TABLE 7-1
Qualified Monitoring Wells
CONTROL TEST
Date
28-Jun

9-M
17-M



30-M





13-AiK






27-Aue





10-Sep










24-Sep







8-Oct
Days
21

32
40



53





67






81





94










109







123
Location
C22B
C23B
C22B
C22B
C23B
C32B
C33B
C22B
C23B
C32B
C33B
C41B
C42B
C22B
C23B
C31B
C32B
C33B
C41B
C42B
C22B
C23B
C32B
C33B
C41B
C42B
C21B
C22B
C23B
C31B
C32B
C33B
C41B
C42B
C21Y
C41Y
C22Y
C21B
C22B
C23B
C31B
C32B
C33B
C41B
C42B
C21B
Iodide
1.92
2.70
2.54
2.69
2.36
4.70
0.67
3.25
3.10
4.22
0.65
4.29
1.24
3.23
4.97
0.61
3.94
1.94
4.45
2.72
2.15
6.99
3.93
3.21
5.10
3.71
0.54
3.13
6.24
0.61
3.59
4.30
4.79
4.73
0.68
1.58
5.08
0.62
2.29
7.98
0.64
3.06
6.80
6.11
2.72
0.51
d-MTBE
243
1100
258
258
598
501
268
206
488
322
283
325
248
291
703
138
374
509
360
510
236
876
396
657
468
712
49
253
787
150
303
702
425
899
101
352
1420
72
144
840
129
251
756
487
911
32
Date



17-M



30-M





13-AiK






27-AiiR





10-Sep










24-Sep







8-Oct
Days



40



53





67






81





94










109







123
Location



T23B
T33B


T23B
T33B
T43B



T23B
T33B
T43B
T53B



T23B
T33B
T43B
T52B
T53B
T62B
T33B
T43B
T53B
T62B







T23B
T33B
T43B
T53B
T62B



T23B
Iodide



5.69
1.04


9.50
2.72
1.01



7.18
1.47
1.75
2.55



0.75
0.87
2.10
2.63
2.55
1.93
3.03
3.06
3.70
1.84







2.20
0.99
4.04
2.47
1.26



2.47
d-MTBE



385
30


1150
410
15



972
559
150
152



134
185
488
110
620
521
494
515
713
733







115
246
487
561
595



198
              75

-------









5-Nov







3-Dec








7- Jan




11-Feb






8-Mar

















151







179








214




249






274








C22B
C23B
C31B
C32B
C33B
C41B
C42B
C22Y
C41Y
C21B
C22B
C23B
C31B
C32B
C33B
C41B
C42B
C21B
C22B
C23B
C31B
C32B
C33B
C41B
C42B
C22Y
C22B
C32B
C33B
C41B
C42B
C21B
C22B
C23B
C32B
C33B
C41B
C42B
C22B
C23B
C24B
C31B
C32B
C33B
C41B
C42B
C22Y
2.30
5.63
0.54
2.68
4.83
6.56
4.00
9.56
1.29
0.61
2.25
9.78
0.71
5.78
1.05
6.97
1.61
1.31
8.26
11.78
1.10
12.80
5.18
8.55
8.58
1.63
9.98
13.94
5.56
9.43
2.92
0.57
3.68
6.03
6.00
5.78
7.36
0.98
7.29
14.20
1.16
0.70
2.08
1.81
1.75
1.52
0.72
190
612
62
238
732
582
813
1550
213
36
135
986
64
521
695
617
496
235
581
1210
128
811
755
499
483
532
838
1200
704
839
400
96
412
567
437
900
578
218
740
1830
0.6
19
247
704
337
469
297









5-Nov







3-Dec








7-Jan




11-Feb






8-Mai

















151







179








214




249






274








T33B
T43B
T53B
T62B





T23B
T33B
T43B
T52B
T53B
T61B
T62B

T23B
T33B
T43B






T23B
T33B
T43B
T53B
T62B
T23B
T33B
T43B
T53B
T62B


T23B
T33B
T43B
T53B
T62B




2.47
2.35
2.69
1.47





6.21
3.71
2.29
0.75
2.39
1.29
3.37

4.15
2.51
1.46






7.72
2.55
2.01
1.56
1.86
3.75
1.82
1.65
1.24
0.69


5.03
1.77
2.40
0.54
1.17




343
322
482
622





571
678
848
552
985
339
796

538
898
162






1400
592
337
444
356
1460
379
185
138
221


1380
734
328
285
253




Note:

(R) Red:  Shallow wells, (Y) Yellow: Middle wells, (B) Blue: Deep wells
Iodide is expressed as mg/L
d-MTBE is expressed as |-ig/L
                                    76

-------
Test of effectiveness of the treatment process on degradation of MTBE is given by:

              Upper Confidence Limit (UCL) = x + ^"'
where x  is the sample mean of SQRT(d-MTBE) in the Test Plot , tn.i,(i- a) is table look-up t value that
reflects the degree of confidence desired, (1-a, a = 0.2) with (n-1) degrees of freedom, s is the standard
deviation of the sample, and n is the sample size.

Results: Given x =21.12, n = 54, s = 7.64, t53,o.8o = 0.85 for SQRT(d-MTBE) in the Test plot, the UCL
is 22.0 which is equivalent to a d-MTBE concentration of 484 ug/L which is greater than the Total Target
Level (TTL) for d-MTBE of 5 ug/L.

The test statistic for the one-sided hypothesis test, H0: UsQRT(d-MTBE) < Ho (Ha: UsQRT(d-MTBE) > Ho) is given
by:
                                X-jU0
                             t =
here u.0 is the square-root of the Total Target Level (TTL) for MTBE  which is 5 ug/L. The calculated "t"
value is 18.2 and is greater than t540 so = 0.84. Therefore the H0 is rejected: that is, the statement that the
mean MTBE concentration in the Test Plot is smaller than 5  ug/L is not true and it is concluded that mean
MTBE concentration in the Test Plot is greater than 5 ug/L.

An independent t-test on the square root of d-MTBE concentrations in the Control Plot and in the Test
was also run giving the following results:


 INDEPENDENT SAMPLES  TJTEST  ON     SMTBE       GROUPED  BY     TCCODE
        GROUP                    N       MEAN             SD
          0.000  (Control)      93       20.50          8.26
          1.000  (Test Plot)    54       21.11          7.63
 SEPARATE VARIANCES T =        -0.452  DF  =  118.6  PROB  =        0.652
    POOLED VARIANCES T =        -0.443  DF  =    143  PROB  =        0.659


The test indicates that the difference between the Control Plot and the Test Plot is not significant;
therefore, the treatment process did not remediate d-MTBE.

                                             77

-------
Although the use of an AN OVA test to evaluate Test and Control Plots differences was described in the
PQA, there are a number of reasons as to why this analysis is not recommended for inclusion in the ITER
including:
              •   Due to the fact that not all monitoring wells provided "useable" data for all sampling
                  events, this becomes a very complicated analysis if performed correctly.  One reason
                  for this is that two estimates of experimental error are required, one for the plot type
                  (between monitoring wells) and one for the event (within monitoring wells).
              •   It is obvious from Figure 7-5 that any event effect has been swamped by variability.

              •   As shown in Figures 6-1 and 6-2 and Table 7-1, the initial concentrations of MTBE
                  in the Test and Control plots are different.
Discussion
Figure 7-5 shows the time trends of d-MTBE of the ground water in the Test Plot and the Control Plot.
The means (solid symbols) of d-MTBE in each sampling event (Event 4 to Event 15) with standard error
(error bar) are presented in Figure 7-5.  It indicates that the standard errors are so great that differences of
d-MTBE between from the Test Plot and the Control Plot are not statistically significant. The average d-
MTBE concentration in any sampling event is far greater than the TTL of 5 |ig/L.

An alternative way to evaluate if biodegradation of d-MTBE is occurring in the Test Plot is to examine
the time trend of total d-MTBE mass with time. Since the d-MTBE front had past the monitoring zone
(beyond the line of monitoring wells T61B  and T62B in the Test Plot, and C41B and C42B in the Control
Plot), time trend of total d-MTBE is not available. However, the time trends of d-MTBE in the transect
T23B, T33B, T43B, T53B in the Test Plot, and the transect of T62B,  as well as C22B, C32B, and C41B
in the Control Plot (Figures 7-6) show that d-MTBE concentrations are erratic and there is no obvious
decrease in d-MTBE (SYSTAT, 1990;  Keppel, 1982).
                                              78

-------
          Test Pbt
          Normal  Distribution
a
N
   -1
   -2
   -3
               10        20        30

                     SORTCMTBE)
40
             Figure 7-1. Test Plot Normal Distribution
                         79

-------
3
N
   -1
   -2
   -3
          Control Plot
          Normal Distribution
              10      20      30

                     SORTCMTBE)
40
50
          Figure 7-2. Control Plot Normal Distribution
                        80

-------
          Probability Plot
          MTBE m Test Rot
N
   -1
   -2



   -3
                  600         1000

                  MTBE Concentration
1500
         Figure 7-3. Probability Plot MTBE in Test Plot
                        81

-------
N
   -1
   -2
          Probability Plot
          MTBE in Test Plot
      23456

                        lh(MTBE)
8
         Figure 7-4. Probability Plot MTBE in Test Plot
                        82

-------
Time Trends of MTBE for Test and Control Plots
i^uu -
1000 -
'E
§- 800 -
c
o
03 600 -
"c
0)
o
c 400 -
o
O
LLJ
& 200 -
0 -




1



T




i-
1





»



• Test Plot
• Control Plot
_

(
l

-

i
I
(





i














-
-

l
<
_

I


l




i






(



-



»




     50
100        150       200
      Time (day)
250
300
 Figure 7-5. MTBE Time Trends for Test and Control plots
                 83

-------
  2000

  1750

  1500
'- 1250
o
£ 1000
O
O
   750
   500
Ld
5 250
5
      0
               50     100     150     200
                           Time  (day)
250
300
               50     100     150     200     250     300
                           Time  (day)
       Figure 7-6. Time Trends of Total d-MTBE Mass in Test and Control Plots
                            84

-------
7.3    EVALUATION OF RESULTS AGAINST OBJECTIVES

This section assesses the results of the Envirogen oxygen and propane biostimulation and
bioaugmentation demonstration in relation to stated primary and secondary objectives.

Primary Objective: Will the technology reduce the final levels of MTBE to less than the treatment
goals established for the demonstration program?

The primary objective was addressed by measuring d-MTBE concentrations in the "qualified samples "
and determining whether, with 80% confidence, the estimate of the population mean is at or below 5
jug/L.

As demonstrated by the t-test in Section 7.2.2, the hypothesis that the mean d-MTBE concentration in the
downgradient Test Plot is smaller than 5 |ig/L is not true and it is concluded that the mean d-MTBE
concentration in the downgradient Test Plot is greater than 5 |ig/L.

Because the treatment goal was not achieved for d-MTBE, the primary objective for d-MTBE was not
met. Furthermore, in achieving the primary objective, the development of the demonstration evaluation
plan centered on providing both direct and indirect means of evaluating the technology to increase
support for the study's conclusions. To this end the project plan called for measurements of direct
indicators including intrinsic MTBE and introduced d-MTBE, as well as indirect approaches including the
creation of daughter products and changes in geochemical parameters.

As discussed previously (Section 6.2.1), the major parameter for evaluating the effectiveness of the
technology is by the reduction of intrinsic MTBE. It is important to note that the concentration of MTBE
dropped about 0.5 mg/L in October and early November, 2000, and the average of the lower screens in
the first downgradient transect in the Test Plot (T21B, T22B, and T23B) dropped from over 5,000 |lg/L in
September 2000, to 935 |lg/L by the time of the first sampling event on June 14, 2001 (Section 6.1).  It is
also  significant, as shown in Figure 6-3 that, although of higher MTBE concentration, the average of the
bottom screens in the upgradient injection wells and downgradient Control Plot dropped consistently
throughout the period of the demonstration.
                                              85

-------
The primary goal of the demonstration was to reduce intrinsic MTBE concentrations in the downgradient
monitoring wells in the Test Plot to 5 |lg/L or below. During the planning stages of the project it was
expected that this reduction would necessarily result from intrinsic MTBE levels which, at that time, were
4-5 mg/L. At the beginning of the project, however, as mentioned above, the first transect had already
fallen to below 1 mg/L. The intrinsic MTBE in the bottom screens in the downgradient Test Plot for the
test period from June 14, 2001, through March 8, 2002, are shown in Figure 7-7 and a least squares line
of the data remains between 500 - 600 |ig/L (300-800 |ig/L actual values) with a small positive slope as
determined by a least squares calculation.
                               Downgradient MTBE in Test Plot
                                               Date
            Figure 7-7. Downgradient Test Plot MTBE Concentrations at the Bottom Screens
As discussed in Section 6.2.2, d-MTBE was added as a non-conservative tracer, used in part to avoid
possible problems associated with fluctuations in the intrinsic MTBE concentrations.  It was introduced
through the tracer injection wells in an amount to add about 1.0 mg/L to the downgradient aquifer. Its use
would provide direct evidence of the efficacy of remediation by the treatment technology.
                                              86

-------
As demonstrated by other tracers, its detection varied according to the diverse conductivity paths in both
the Test and Control Plots. In general, the more conductive downgradient bottom-screen monitoring
wells appeared to increase over the tenure of the project with pronounced variations most likely resulting
from periods when the injection wells were not operating, as discussed in Section 6.2.2.

The most important result is demonstrated in Figure 6.8 which shows that d-MTBE concentrations in the
lower screens in both the Test and Control Plots increased throughout the period of the evaluation
demonstration.  Although concentrations in the downgradient Control Plot were somewhat higher than
those in the Test Plot, due to zones of higher hydraulic conductivity, it should be noted that the rates of
increase, as shown by the least squares line, are the same.

As discussed in Section 6.2.3, the processes resulting in the remediation of intrinsic MTBE and d-MTBE
would necessarily result in the production of both deuterated and non-deuterated degradation or daughter
products with masses commensurate with the reduction of the parent compounds. Tables 6.2 and 6.3 in
Section 6.2.3 show that, as would be expected, only non-deuterated TEA was detected in the bottom
screens of both the upgradient Control and Test Plots with mean values of 105 and 29 |ig/L, respectively.
Non-deuterated TEA also was detected in the  downgradient bottom screens with mean values of 63 and
29 |ig/L, respectively. Almost identical values of d-TBA were also detected at the downgradient Control
and Test Plot with very low mean values of 25 and 29 |ig/L, respectively.  One other non-deuterated
daughter was detected in the downgradient Test Plot,  that being acetone with a mean value of 10 |ig/L.

Secondary Objective No. 1: Determine time of travel to the sampling points using bromide:

The objective was met as discussed in Section 5.1.  Ground-water velocities and associated times of travel
were highly variable in both the horizontal and vertical direction.  Although the time of travel in the
Control Plot was found to be significantly lower than that in the Test  Plot, considerable variance was
noted even along common transects.  A significant finding was that ground-water flow in both Plots was
almost totally confined to the lower part of the aquifer. Although highly variable in magnitude and
location, ground-water velocities in many locations ranged from 0.1-0.5 ft/day in the more conductive
zones.
                                               87

-------
Secondary Objective No. 2: Establish the absence of trace metals inhibitors:

The objective was met as the analytical results determined from ground-water samples collected from the
upgradient monitoring locations during the first sampling event confirmed the absence of the metal
inhibitors.

Secondary Objective No. 3: Evaluate the formation of daughter products and determine if they
were consistent with a microbiological transformation process:

As discussed in Section 6.2.3, very low levels of TEA and d-TBA were detected in almost equal amounts
in both Control and Test Plot downgradient wells.  Low levels of non-deuterated TEA were also detected
in the upgradient wells in both the Control and Test Plots.

Section 6.2.4 discusses observations in geochemical parameters as another indirect measure of the
effectiveness of the treatment technology. The biological processes involved in the reduction of MTBE
or d-MTBE would necessarily result in alterations to the alkalinity, nutrients, and electron donors such as
organic carbon. As shown in Tables 6.3 and 6.4, not only are the geochemical parameters very similar
between the Control and Test Plots, they remain virtually unchanged from upgradient to downgradient
monitoring locations.

Secondary Objective No. 4: Evaluate changes in geochemical parameters and determine if they
were consistent with the microbiological transformation processes:

As discussed in Section 6.2.4, water quality parameters such as alkalinity and nutrients remained constant
throughout the test period indicating that significant alterations resulting from biological processes were
not taking place. Of particular significance is the lack of utilization of organic carbon which is required by
bacteria as electron donors in considerably larger mass quantities than the mass  of the contaminant being
remediated.

Secondary Objective No. 5: Define operating costs over a 10-month period of stable operation:

Operating costs are discussed in the economic analysis of the Envirogen technology in Section 8. The
economic analysis utilized operating data from a previous demonstration as well as information collected
from field demonstrations at hazardous waste sites.

-------
Secondary Objective No. 6: Estimate exponential order of degradation and calculate MTBE
degradation rate constant:

According to the statistical analysis Section 7.2.2, an alternative way to evaluate if biodegradation of d-
MTBE is occurring in the Test Plot is to examine the time trend of total d-MTBE mass with time. Since
the d-MTBE front had passed the monitoring zone (beyond the line of monitoring wells T61B and T62B
in the Test Plot, and C41B and C42B in the Control Plot), time trend of total d-MTBE is not available.
However, the time trends of d-MTBE in the transect T23B, T33B, T43B, T53B in the Test Plot, and the
transect of T62B, as well as C22B, C32B, and C41B in the Control Plot (Figure 7.6) show that d-MTBE
concentrations are erratic and that there is no obvious decrease in d-MTBE.

Secondary Objective No. 7: Determine the fraction of d-MTBE removed at each sampling location
at each sample time:

As discussed in Section 6, the most persuasive evidence of this finding is shown in Figure 6.8 which
demonstrates that at downgradient bottom screens d-MTBE in both the Control and Test Plots increased
throughout the test period. Therefore there was no significant reduction of d-MTBE even though minor
levels (See Tables 6-2 and 6-3) of d-TBA at about the same concentration were detected in both the Test
and Control Plots.

Secondary Objective No. 8: Evaluate d-MTBE reduction in the Control Plot receiving only oxygen
injection:

As shown in Figure 6.8, the least squares fit in both the Control and Test Plots indicates that
downgradient d-MTBE concentrations increased over the study period at about the same rate, with those
in the Control Plot being somewhat higher.

7.4    QUALITY ASSURANCE AND QUALITY CONTROL RESULTS

A data quality review was conducted by SPRD to evaluate field and laboratory QC results, the
implications of QC on the overall data quality, document data use limitations for data users, and remove
unusable  values from the demonstration data sets. The results of this review were used to produce the
final data sets to assess the treatment technology and to draw conclusions. The QC data were evaluated
with respect to the quality assurance (QA) objectives defined in the project QAPP (SAIC 2001).

                                             89

-------
The analytical data for ground-water samples collected during the Envirogen demonstration were
reviewed to ensure that they are scientifically valid, defensible, and comparable. A data quality review
was conducted using both field and laboratory QC samples. The field QC samples included source water
blanks, field blanks, trip blanks, matrix spike/matrix spike duplicates (MS/MSD), and sample duplicates.
Laboratory QC checks included laboratory blanks, surrogate spikes, and laboratory control
sample/laboratory control sample duplicates (LCS/LCSD) (also known as blank spike/blank spike
duplicates). Initial and continuing calibration results were also reviewed to assure the quality of the data
and that proper procedures were used. The review focused on assessing the precision, accuracy,
completeness, representativeness, and comparability of the data.

All critical parameter data were reviewed with one hundred percent of the iodide samples by SPRD and at
least ten percent of d-MTBE samples by SAIC from the demonstration phase being fully validated
(recalculated from the raw instrument data). In addition to the above QC checks, reviews of sample chain
of custody, holding times, and critical parameter identification and quantification were performed by
SPRD.

Overall, the data quality review assessed the critical parameter data to be usable for the purpose of
evaluating the technology and the attainment of the primary objective for this demonstration. In some
instances, results for one or more  QC parameters were outside of control limits; however, deviations were
generally slight, and no broad qualifications of data or other actions were required. A description of the
more significant deviations from QC acceptance criteria and the limited impact of these deviations are
described below:

       •       During the fifteen sampling events iodide was not detected in any of the trip blanks.
               Another critical parameter, d-MTBE, was only detected in one trip blank during sampling
               Event 4 at 0.1 |ig/L.  Because this is an order of magnitude below the reporting limit, it
               does not have any impact on data quality.
       •       The laboratory (ALSI) that performed the MTBE and d-MTBE analysis routinely takes
               water for blanks and standards from an on-site well since the well-water contains very
               few detectable VOCs. This water does contain background concentrations of MTBE at
               about 0.3 |J.g/L. MTBE was detected at concentrations of approximately 0.3 |ig/L in
               many of the method blanks and in 13  of the trip blanks. Because this value is
               approximately 3 times less than the reporting limit for MTBE for this project (and
               approximately 16 times less than the treatment goal), it was determined very early on in
               the project that this water could be used without affecting project activities.
       •       For the VOC analyses, during Events 1-15, MS and MSD percent recoveries were
               generally (80/84 for MTBE/d-MTBE, 84/84 for 2-propanol, 84/84 for acetone, and 84/84

                                               90

-------
              for TEA) within the acceptance criteria of 80 to 120 percent, and no data were rendered
              unusable due to MS/MSD results. In some cases (4/84 for MTBE/d-MTBE), the percent
              recoveries for MTBE and other critical parameters were above the QC limits in
              MS/MSDs performed on water samples. However, these high recoveries were most likely
              due to the high native concentrations present in the sample (i.e., the spike concentration
              was too low) or in the case of iodide, it was due to using a small volume for spiking
              (again, the spike concentration was too low). Because the LCS/LCSD recoveries were
              generally (62/62 for MTBE/d-MTBE, 62/62 for 2-propanol, 62/62 for acetone, and 61/62
              for TEA) within the acceptance criteria, data were not disqualified based on the high
              MS/MSD recoveries. Relative percent differences (RPDs) between the MS and MSB
              samples were also generally (39/42 for MTBE) within the acceptance limits.

       •      For VOC, LCS/LCSD percent recoveries and RPDs were generally (62/62 for MTBE)
              within QAPP acceptance limits. Similar accuracy was observed from the recoveries of
              the VOCs surrogates from the demonstration samples.

       •      Field duplicates were collected and analyzed at a frequency of five percent or more for
              the fifteen demonstration sampling events. Field duplicate results uniformly met QAPP
              precision criteria of+/- 25% RPD for the critical parameters. Therefore, no qualification
              was added to the data.

SPRD also conducted a cursory quality control review for the conservative tracers used as non-critical

analytical parameters. This review was performed to confirm the overall usability of the data in the

evaluation of the secondary objectives. Based on this review, the non-critical data were assessed to be

usable for their intended uses.
During the third demonstration sampling event, QA supervisory personnel conducted a Technical

Systems Audit (TSA) of field sample collection and handling procedures. In order to verify that the

requirements of the EPA QAPP were met, QA supervisory personnel also completed two TSAs of the

laboratories responsible for analyzing the critical parameters (d-MTBE/MTBE and iodide). Given that

the three TSAs were conducted early on in the project, the non-conformance had minimal impact on data

quality.


Based on the information reviewed during the field TSA and requirements of the QAPP,  four findings and

three observations were noted. The field TSA also resulted in clarifications and modifications to the

sampling procedures established in the QAPP. These generally involved changes in documentation

practices, sampling order schedules, sample packing procedures, and sample identification number

formats. In addition, the field TSA corrective action included documentation of adequate field

observations so that various events could be reconstructed. The audit increased the frequency of operation

and maintenance activities performed by the NBVC personnel to a minimum of five times per week.  A
                                              91

-------
requirement to ensure that the correct concentration of d-MTBE and iodide is present in the tracer
reservoirs (Teldar bags) resulted in monthly sampling throughout the duration of the project.

The laboratory audit of ALSI for the analysis of d-MTBE/MTBE identified no finding or observation.
The only identified miscellaneous issues dealt with an on-site well that was used as the source water for
blanks and preparation of aqueous standards as described above.  The audit resulted in minor
modifications to the QAPP involving personnel name and title corrections as well as the addition of new
personnel responsible for COC issues.

For the analysis of iodide samples, it is paramount to note the circumstances surrounding the involvement
of ManTech in performing this task.  Since, initially, DelMar was retained to conduct the analysis, the
samples from the first sampling event (6/14/2001) were submitted and analyzed by DelMar. Prior to the
second sampling event on 6/20/2001, due to budgetary constraints, a decision was made to send all
subsequent samples to ManTech. Samples from the second sampling event on 6/28/2001, and all
subsequent events were submitted to ManTech. Therefore, ManTech had a very short lead time to
prepare to perform these analyses, which resulted in the following audit QAPP discrepancies.

During the ManTech TSA, while the third of fifteen sampling events was taking place, the following
procedures were audited: sample receipt and storage; iodide analysis; reporting, reduction, and validation
of data; and requirements of the  QAPP.  Four findings and six observations were identified. The findings
concerned the addition of the second source standard for iodide which was analyzed and was within
acceptance criteria but was not reported for four of the sampling events. Additional TSA
recommendations were to also perform LCS analysis for every sampling event with each MS/MSD, to
accumulate all data storage locations with respect to this evaluation project in one location and to identify
this location on Millennium Software. The TSA increased the frequency of the routinely performed raw
data backups on CDs with their inferences being referenced in the Lab notebook.

Therefore, as corrective actions, in response to the above noted findings, ManTech prepared an addendum
to the respective report letters for Events 2,3,6, and 7 that contained the results for the second source
standards. All other future reports included the second source standard values.  Laboratory Control
Samples (LCS) was analyzed for all the events that followed the audit debriefing and all subsequent
events with each MS/MSD.  Since the data acquisition computer is equipped with a CD writer, raw data
backups were performed after analyzing each sample event.  All backups and data locations were
identified in the Lab notebook.

                                              92

-------
The last finding of the laboratory audit described the spike recovery of the fourth sampling event.  The
report stated that MS/MSD recoveries on sample 4-T16d for iodide were incorrectly calculated due to
improper integration performed by the software and had to be done manually. Following the manual
corrections, MS recovery at this location (4-T16d) was at 129% which exceeded the QAPP acceptance
criteria of 80-120%.  This high recovery is probably due to the chemist using a small volume (10 |J,L) for
spiking because small volume measurements are subject to greater errors since all other QC during the
fourth sampling event met criteria. Consequently, it was determined that this non-conformance did not
negatively affect data quality and all data were used without qualification. Also a change in the true value
of the check standard from 10 ppm to 1 ppm was realized.  Therefore, as a corrective action, the
laboratory issued an amendment to the report letter for Event 4 which included the corrected values for
the spike recoveries on sample 4-T16d. The final concentration of spike added was 1.0 mg/L.  All values
for the check standards that were incorrectly reported were also changed.

Three of the observations noted during the ManTech laboratory TSA were (1) to provide a temperature
log book with daily temperature recordings for the sample storage room, (2) a need to issue a report to the
TLP to identify all analytical conditions for the 1C method used (based on EPA Method 300.0) with
detailed descriptions to be able to reproduce the method, and (3) a recommendation to perform a
calibration check for autopipets used for spiking according to  a draft SOP developed by the SPRD QA.
This corrective action was implemented following the audit debriefing and indicated the autopipets
calibration fell within the required criteria.

The ManTech TSA recognized a fourth observation that the MDL had not been determined for iodide.
The PQL was defined as 0.5 mg/L in the QAPP. Accordingly, all iodide data for samples with quantities
between 0.5 mg/L and the MDL were required to be reported (with qualifiers). Consequently, all sample
data previously reported as <0.5 mg/L were reviewed to determine if they fell in this range, and reports
were re-issued with these data. The TSA report stated that the non-conformance should have minimal
impact on the data quality for the primary objectives.

The only minor clarification and modification to the QAPP resulted from change of a personnel name to
correctly identify the  sample recipient personnel and duty performed. This change did not negatively
affect data quality.
                                              93

-------
                                         SECTION 8
                                   ECONOMIC ANALYSIS

This economic analysis presents cost estimates for using the Envirogen technology to treat contaminated
ground water. Cost data were compiled during the demonstration at the NBVC, during the
previous demonstration at a service station in New Jersey, and from Envirogen. The vendor claims
that because the demonstration at the NBVC project involved the application of their technology at pilot-
scale, it was not possible to evaluate the start-up costs based on data collected during the demonstration.
Therefore, the start-up costs were reviewed and scaled accordingly based on team member's experience
with full-scale remediation using related technologies (i.e., sparging and biostimulation) and lessons
learned  during the demonstration. This also is due, in part, because some of the demonstration's
associated costs such as installation of the ground-water monitoring wells and plots survey were handled
by EPA. As a National Environmental Technology Test Site (NETTS), NBVC was responsible for
providing access to pre-characterization data. Furthermore, the ground-water sampling and routine
operation and maintenance of the Envirogen system was performed in association with NBVC staff.
NETTS supplied utilities, handled waste disposal, and assisted in site demobilization activities. EPA
served as the interface between California Water Quality Board and the NBVC for the technical
justification and preparation of the project permit, therefore, the permitting cost for Envirogen was
reduced to attending a public hearing meeting.

This section describes a site, based on experience gained by Envirogen's previous demonstration at a gas
station as well as that gained at the Port Hueneme field demonstration.  These experiences were selected
for economic analysis, summarized the major issues involved and assumptions made in performing the
analysis, discussed costs associated with using the  Envirogen propane biostimulation and
bioaugmentation technology to treat ground-water contaminated with MTBE, and presented a conclusions
of the economic analysis.

8.1   INTRODUCTION

The vendor operated a system consisting of a network of oxygen, bacteria, and propane  injection points,
pressurized oxygen and propane gas delivery and control systems, and ground-water and soil-gas
monitoring network.  However, the vendor claims the system could operate with slight modifications at a
larger or smaller scale; therefore, the economic analysis presents and evaluates costs based on an
                                              94

-------
application involving the treatment of contaminated ground water at a typical gas station site. Table 8-1
summarizes estimated costs as determined by Envirogen.

8.2   APPLICATION ISSUES AND ASSUMPTIONS

Typically, costs are placed in 12 categories applicable to typical cleanup activities at Superfund and
RCRA sites (Evans 1990). These categories include: (1) site preparation, (2) permitting and regulatory,
(3) mobilization and startup, (4) equipment, (5) labor, (6) supplies, (7) utilities, (8)  effluent treatment and
disposal, (9) residual waste shipping and handling, (10) analytical services, (11) equipment maintenance,
and (12) site demobilization. Even with a detailed analysis, costs are considered to be order-of-magnitude
estimates with an expected accuracy of from 30 - 50 percent above to 30 -50 percent below actual costs.
Therefore, for this economic analysis, the categories applicable to hazardous waste sites are recognized
and discussed.  In the event that a determination of a distinct cost associated for each of the categories
was not possible due to the special circumstances of this project (see Section 8), an attempt was made to
provide an estimated cost at the hazardous waste  sites. However, based on Envirogen's past performance,
this section also describes the case of "atypical gas station" selected for economic analysis, summarizes
the major issues involved and assumptions made  in performing the analysis, discusses costs associated
with using the Envirogen technology to treat ground-water contaminated with MTBE, and presents the
conclusions of the economic analysis.

This section lists the major assumptions, site-specific factors, equipment and operating parameters, and
financial calculations used in this economic analysis of the Envirogen technology. Issues and
assumptions are presented in Sections 8.2.1 through 8.2.3. Certain assumptions were made to account for
variable site and waste parameters. Other assumptions were made to simplify cost estimating for
situations that actually would require complex engineering or financial functions. Section 8.2.3 provides a
hypothetical base-case scenario developed from the assumptions. In general, Envirogen system operating
issues and assumptions are based on information provided by Envirogen and observations made during
the demonstration.
                                               95

-------
                                      TABLE 8-1
Estimated Cost for Envirogen Propane Biostimulation and Bioaugmentation Project
                                at a Typical Gas Station
Activity

Design
Procurement and
Mobilization
Installation
Baseline
Monitoring
Startup
O&M and
Quarterly
Monitoring
Utilities Including
Electric and
Propane/ Quarter
Demobilization
Final Report
Total*
Event
No.
1
1

1
1

1
8

8

1
1

Labor

$ 21,700
$ 19,540

$ 31,660
$ 1,400

$ 4,360
$ 6,135



$ 3,325
$ 1,605

Pass
Through
$
$ 120

$ 1,350
$ 1,550

$ 480
$ 2,005

$ 430

$ 300
*t
j>

Subcontracted
Equipment
$
$ 2,625

$ 15,015
$ 1,208

$
$ 53



*t
j>


Materials

$
$

$ 1,815
$

$
$ 28



$
$

Total

$ 21,700
$ 22,285

$ 49,840
$ 4,158

$ 4,840
$ 65,760

$ 3,440

$ 3,625
$ 1,605
$ 177,253
        Abbreviation:

                O&M:   Operation and Maintenance

        Note:
            *:   Total estimate for remediation cost is based upon 2 years of operation.
             1.   The cost of oxygen is not provided in Table 8-1.
             2.   Design cost includes design and drawings, discharge permit application, and attending
                one meeting.
             3.   Procurement and mobilization include equipment and materials procurement,
                mobilization preparation, and mobilization.
             4.   Installation cost includes subcontractors' labor, materials, and equipment for site work
                including air sparging points, monitoring wells, trenching, and pipe installation,
                backfilling and surface restoration, system and electrical connection.
             5.   Baselines monitoring includes sampling 4 wells and VOC analysis.
             6.   Startup cost is based on  three days of monitoring and a letter report.
             7.   Quarterly monitoring includes sampling 4 wells and VOC analysis and a letter report.
             8.   Demobilization includes disconnection, dismantling, and system removal from site.
             9.   Final report includes final letter report prepared and submitted to client.

-------
8.2.1    Site-Specific Factors

Site-specific factors can affect the costs of using the Envirogen treatment system. These factors can be
divided into the following two categories: waste-related factors and site features. Waste-related factors
affecting costs include waste volume, contaminant types and levels, treatment goals, and regulatory
requirements. Waste volumes affect total project duration and, consequently, costs because a larger
volume takes longer to treat. However, economies of scale are realized with a larger-volume project when
the fixed costs are distributed over the larger volume. The contaminant types and levels in the ground
water and the treatment goals for the site determine (1) the appropriate Envirogen treatment system size,
which affects capital equipment costs , and (2) periodic sampling requirements, which affect analytical
costs. Regulatory requirements affect permitting costs and sampling as well as the ground-water
monitoring costs. Site features affecting costs include ground-water recharge rates, ground-water
chemistry, site accessibility, availability of utilities, and geographic location. Ground-water recharge rates
affect the time required for cleanup. Site accessibility, availability of utilities, and site location and size all
affect site preparation costs. Site-specific assumptions include the following:

        1.      The site is a located near an urban area. As a result, utilities and other infrastructure
               features (for example, access roads to the site) are readily available.
        2.      The site is located in a region that has relatively mild temperatures during the winter
               months resulting in potentially high bacterial metabolism.
        3.      Contaminated ground water is located in a shallow aquifer.

8.2.2  Equipment and Operating Parameters

The Envirogen biostimulation system can be used to treat shallow ground water contaminated with
MTBE. This analysis provides costs for treating contaminated ground water. Envirogen will provide the
appropriate system configuration based on site specific conditions, of which ground-water recharge rates
and contaminant concentration are the primary considerations. The Envirogen system can be configured
to meet certain site requirements by varying the sparge systems, which are  also dependent on site
conditions. The Envirogen system is modular in design, which allows for treatment units either in series
or in parallel to treat ground water. This analysis focuses on the estimated costs associated with the unit
demonstrated at the NBVC  Site. The vendor claims that their system can treat ground water contaminated
with BTEX/MTBE concentration in the source area at 60 mg/L with the maximum contaminant being
MTBE. The system operates on a continuous cycle, 24 hours per day, 7 days per week.
                                               97

-------
Based on these assumptions, this analysis assumes that about 81,000 gallons of water need to be treated to
complete the ground-water remediation project, which will take about 2 years to process. It is difficult in
practice to determine both the volume of ground water to treat and the actual duration of a project, but
these figures have been assumed to perform this economic analysis.

As expected in a full operation, neither depreciation nor salvage value is applied to the costs presented in
this analysis because the equipment is not purchased by a customer. All depreciation and salvage value is
assumed to be incurred by Envirogen and is reflected in the ultimate cost.  Equipment and operating
parameter assumptions are listed below.

        1.      The treatment system is operated 24 hours per day, 7 days per week, 52 weeks per year;
        2.      The treatment system operates automatically without constant attention of an operator;
        3.      Modular components consisting of the equipment needed to meet potential treatment
               goals are mobilized to the site and assembled by Envirogen;
        4.      Air emissions monitoring is necessary;  and
        5.      Envirogen equipment will be maintained by Envirogen and will last for the duration
               of the ground-water treatment project with proper maintenance.

Specifically, Envirogen claims that operation and maintenance costs shown in Table 8-1 are based on
typical monitoring requirements including:

        1.      Personnel training required to operate, maintain, and monitor the system;
        2.      Analytical costs;
        3.      Routine maintenance;
        4.      Waste handling and disposal; and
        5.      Utilities.

Envirogen believes that no specialized training costs are associated with the operation, maintenance, and
monitoring of this type of system.  An understanding of system operation and the importance of vapor
monitoring results as they apply to fugitive  VOC and propane emission is required.  Analytical costs for
MTBE analysis would not increase for the typical gas station site at which regular VOC analysis is
constructed, as MTBE is included in the standard VOC  scan. Additional analytical costs might include

-------
analysis for TEA, dissolved carbon dioxide, and propane.  Bacterial analyses may be required at some
sites, with associated additional costs, particularly at sites where bioaugmentation is performed. Routine
system maintenance, including that necessary to prevent silting and clogging of wells, is similar to that
required for a typical air sparge system at a comparable cost.  The labor costs for sampling and
monitoring activities would be slightly higher than those for a standard monitoring program, because low-
flow ground-water sampling methods would be employed.

8.2.3   Base-Case Scenario

A hypothetical base-case scenario has been developed using the issues and assumptions described above
for the purposes of formulating this economic analysis. Although the system under this evaluation was
not a portable unit, the costs presented are for an Envirogen system for the remediation of contaminated
ground water at a typical gas station. Thus, the following assumptions are made by Envirogen for the gas
station remediation.
        1.      The service station area is 100 feet, x 60 feet, with the remediation area measuring 60 x
               60ft.
        2.      The subsurface soil is a medium sand with a porosity of 0.3 and the depth to ground
               water is 10 ft. below grade (bg).
        3.      The vertical extent of ground water contamination is 10 feet, below the ground water.
               Thus, the volume of ground water to be treated is 81,000 gal.  The volume of saturated
               contaminated soil is 1330 yd3.
        4.      The BTEX/MTBE concentration in the ground water in the source area is 60 ppm with
               the maximum contaminant being MTBE.
Envirogen made additional assumptions for the installation, operation, and maintenance of their
biostimulation system:

        1.      6 air sparging/propane injection points installed to 10 feet, below ground water.
        2.      4 monitoring wells installed to 10 ft. below ground water.
        3.      4 monitoring points installed to 1 foot, above ground water.
        4.      Estimated 200 feet, of piping to injection points installed below grade.
                                               99

-------
       5.      Biostimulation system trailer with air sparging blower, propane tank, piping,
               instrumentation and control panel. The tasks for implementing the design, installation,
               and operation and maintenance of the system with a description of the subtasks with their
               associated costs are provided in Table 8-1.

Envirogen claims that the total cost is based on the time needed to remediate the ground water to a
cleanup objective of 70 |ig/L. The time to remediate the ground water to the cleanup objective is
estimated to be two years which was derived from degradation rates from other sites. Based on a two-
year remediation, the total cost for the project is estimated to be $177,000 +/- 20%.  Envirogen stated that
at a volume of contaminated ground water of 81,000 gallons, the unit cost to remediate this medium is
$2.35/gal.  Further assumptions used for this base-case scenario are listed below.

       •       The air sparging will operate four times a day at 0.5 hour each time for a total operating
               time of 2 hours/day.
       •       The site is near Envirogen's office and travel cost and per diems are not needed.
       •       If bacterial injection is needed, the additional cost is $1000 per event.
       •       The bio stimulation system will be leased to the project.

8.3    COST CATEGORIES

Table 8-1 presents  cost breakdowns as provided by Envirogen addressing the various cost  categories.
Cost data associated with the MTBE demonstration program and hazardous waste sites have been
presented for the following categories: (1) site preparation, (2) permitting and regulatory, (3) mobilization
and startup, (4) equipment, (5) labor, (6) supplies, (7) utilities, (8) effluent treatment and disposal, (9)
residual waste shipping and handling, (10) analytical services, (11) equipment maintenance, and  (12) site
demobilization. Each of these cost categories is discussed below.

8.3.1   Site Preparation Costs

Site preparation costs include administrative, treatment area preparation, treatability study, and system
design costs. Site preparation administrative costs, such as costs for legal searches, access  rights, and site
planning  activities, are usually estimated to be $35,000.
                                               100

-------
The treatment area preparation includes constructing a shelter building or purchasing a pre-manufactured
shed for the housing of the air sparging blower, propane tank, piping, instrumentation and control panel.
The shelter building needs to be constructed before mobilization of the technology system.

A building with a minimum of 200-square-foot is required for the system. Vendor will provide the shelter
building design specifications.  Construction costs will be varied based on the geographic location and the
need for installation of heating and cooling system. Construction cost for building a shelter is estimated
to be $90 per square foot, with a natural gas heating and cooling unit and ductwork costing  about $10,000
installed. The total shelter building construction cost system is estimated to be $28,000.
This analysis assumes that monitoring wells exist on site and are located 200 feet from the shelter
building. The total costs, including all electrical equipment and installation (air sparging blower and
instrumentation and control panel), are $7,000. Piping and valve connection costs are about $20 per foot,
which covers underground installation. Therefore, the total piping costs are $4,000. The total treatment
area preparation costs are estimated to be $74,000.

A treatability study and system design will be conducted by the vendor to determine the appropriate
treatment system. It is assumed that the vendor will transport its mobile system to the site to test the
equipment under site conditions. Six to eight samples will be collected from the influent and effluent and
will be analyzed off site for VOCs. The estimated treatability study cost is $15,000, including labor and
equipment costs. System design includes determining the size and configuration of the system to achieve
treatment goals and designing the configuration. The system design is estimated to cost $5,000. Total site
preparation costs are, therefore, estimated to be $94,000.

8.3.2   Permitting and Regulatory Costs

Permitting and regulatory costs depend on whether treatment is performed at a Superfund or a RCRA
corrective action site and on how treated water and any solid wastes are disposed. Superfund site remedial
actions must be consistent with all applicable environmental laws, ordinances, regulations,  and statutes,
including federal, state, and local standards and criteria. Remediation at RCRA corrective action sites
requires additional monitoring  and record keeping, which can increase the base regulatory costs.  In
general, applicable or relevant  and appropriate requirements (ARARs) must be  determined  on a
site-specific basis. The cost of this permit would be based on regulatory agency requirements and
treatment goals for a particular site. The discharge permit is estimated to cost $5,000.
                                               101

-------
8.3.3   Mobilization and Startup Costs

Mobilization and startup costs include the costs of transporting the system to the site, assembling the
system, and performing the initial shakedown of the treatment system. The vendor provides trained
personnel to assemble and conduct preliminary tests on the system. The vendor personnel are trained in
health and safety procedures, so health and safety training costs may not be included as a direct startup
cost. Initial operator training is needed to ensure safe, economical, and efficient operation of the system.
The vendor provides initial operator training to its clients as part of providing the system. Transportation
costs are site-specific and vary depending on the location of the site in relation to the system. For this
analysis, the system is assumed to be transported 1,000 miles. The vendor retains the services of a cartage
company to transport all of their treatment system equipment. Mobilization costs  are about $10 per mile,
for a total cost of $ 10,000. The costs of highway permits for overweight vehicles  are included in this total
cost. Assembly costs include the costs of unloading equipment from the trailers, assembling the system,
hooking up well piping, and hooking up electrical lines. A two-person crew will work three 8-hour days
to unload and assemble the system and perform the initial shakedown. The total startup costs are about
$10,000, including labor and hookup costs. Total mobilization and startup costs are therefore estimated to
be $20,000.

Specifically, for the purpose of this economic analysis, as described previously in the Section 8.0, the
startup costs were reviewed and scaled accordingly based on Envirogen team member's experience with
full-scale remediation using related technologies (i.e., sparging and biostimulation) and lessons learned
during the NBVC demonstration. Each of the costs is site-specific and will vary according to the degree
of design and installation required.  Startup costs that were evaluated include the  following:

        1.      System design and work plan preparation;
        2.      Permitting and regulatory approval;
        3.      Well installation costs including air sparge points and monitoring wells; and
        4.      Capital equipment costs including system components, and monitoring equipment, and
               well installation costs are not applicable if an existing system (e.g., an air sparge system)
               is being retrofitted to include propane injection and bioaugmentation.  In that case,
               existing monitoring wells would be used, and existing air sparge points could be used for
               substrate and bacterial injection.  According to Envirogen, capital equipment costs for
               system components associated with retrofitting an existing system are minimal.
                                               102

-------
               Envirogen further claims that in any propane biostimulation system, very little propane is
               required, with typical feed rates of less than 0.3 pounds of propane per day. When
               coupled with air or oxygen injection, the need for vapor extraction is typically eliminated,
               although the need for this contingency is site-specific. If a vapor extraction system is
               required, the cost for a standard SVE system would apply.

8.3.4   Equipment Costs

Envirogen provides the complete Envirogen treatment system configured for site-specific conditions. All
Envirogen treatment equipment is leased to the client. As a result, all depreciation and salvage value is
incurred by Envirogen and is reflected in the price for leasing the equipment. At the end of a treatment
project, Envirogen decontaminates and demobilizes its treatment equipment (see Section 8.3.12, Site
Demobilization Costs). Envirogen assumes that this equipment will operate for the duration of the
ground-water remediation project and will still function after the remediation is complete as a result of
routine maintenance and modifications. Equipment costs are determined by the size of the Envirogen
system needed to complete the remediation project and are incurred as a lump  sum; as a result, even
though the equipment is leased to the client, it is not priced at a monthly rate. For this analysis, Envirogen
estimates that the base capital equipment costs is $10,000 for a system employed at a typical gas station.

8.3.5   Labor Costs

Once the system is functioning, it is assumed to operate continuously except during routine maintenance,
which the vendor conducts (see Section 8.3.11, Equipment Maintenance Costs). One operator trained by
the vendor performs routine equipment monitoring and sampling activities. Under normal operating
conditions, an operator is required to monitor the system about once each week. This analysis assumes
that the work is conducted by a full-time employee of the site owner and is assigned to be the primary
operator to perform system monitoring  and sampling duties. Further, it is assumed that a second person,
also employed by the site owner, will be trained to act as a backup to the primary operator. Based on
observations made at the demonstration, it is estimated that operation of the system requires about 8 hours
per week of the primary operator's time. Assuming that the primary operator's burden labor rate is $50 per
hour, the total annual labor cost is estimated to be  $20,800.
                                              103

-------
8.3.6   Supply Costs

Except for oxygen, propane, and bacteria, no other chemicals or treatment additives are expected to be
needed to treat the ground water using the technology. Supplies that will be needed as part of the overall
ground-water remediation project include Level D, disposable personal protective equipment (PPE), PPE
disposal drums, and sampling and field analytical supplies. Disposable PPE typically consists of latex
inner gloves, nitride outer gloves, and safety glasses. This PPE is needed during periodic sampling
activities. Disposable PPE is assumed to cost about $600 per year for the primary operator.
Used PPE is assumed to be hazardous and needs to be disposed of in 24-gallon, fiber drums. One drum is
assumed to be filled every 2 months, and each drum costs about $12. The total annual drum cost is,
therefore, about $100.

Sampling supplies consist of sample bottles and containers, ice, labels, shipping containers, and
laboratory forms for off-site analyses. For routine monitoring, laboratory glassware is also needed. The
numbers and types of sampling supplies needed are based on the analyses to be performed. Costs for
laboratory analyses are presented in Section 8.3.10. The sampling supply costs are estimated to be $1,000
per year. Total annual supply costs are estimated to be $1,700.

8.3.7   Utility Costs

Electricity is the only utility used by the Envirogen system. Electricity is used to run the Envirogen
treatment system. This analysis assumes that electrical power lines are available at the site. Electricity
costs can vary considerably depending on the geographical location of the site and local utility rates.  Also,
the consumption of electricity varies depending on the Envirogen  system used, the total number of air
sparging units and other electrical equipment operating. This analysis assumes a constant rate of
electricity consumption based on the electrical requirements of the Envirogen treatment system.

For the demonstration at Port Hueneme, the Envirogen control panel system that utilized 110 volt power
was mounted on a portable, unitrust assembly that was anchored on an exterior wall of the U.S. EPA
shelter building. The demonstration system power was supplied by NETTS.  The total annual electrical
energy consumption provided by Envirogen was based on their project at a gas station in New Jersey with
the total annual electricity costs are therefore estimated to be about $ 6,276.
                                              104

-------
Water and natural gas usage are highly site specific but assumed to be minimal for this analysis. As a
result, no costs for these utilities are presented.

8.3.8   Effluent Treatment and Disposal Costs

Depending on the degree to which treatment goals for a site were met, additional effluent treatment may
be required, and thus additional treatment or disposal costs may be incurred. Because of the uncertainty
associated with additional treatment or disposal costs, this analysis does not include effluent treatment or
disposal costs.
The Envirogen system requires air monitoring because of the application of propane as a treatment
substrate.  As a result, additional air emission control may be required, and thus additional treatment or
disposal costs may be incurred. Because of the uncertainty associated with additional treatment costs, this
analysis does not include effluent treatment costs.

However, it is assumed that effluent monitoring (ground water leaving the treatment zone) and the air
emission at the vapor monitoring and the ground water points are routinely conducted by the primary
operator.

8.3.9   Residual Waste Shipping and Handling Costs

The only residuals produced during a successful propane biostimulation and bioaugmentation system
operation are fiber drums containing used PPE and waste sampling and field analytical supplies, all of
which are typically associated with a ground-water project. This waste is assumed to be hazardous and
requires disposal at a permitted facility. This analysis assumes that about six drums of waste are disposed
of annually. The cost of handling and transporting the drums  and disposing of them at a hazardous waste
disposal facility is about $1,000 per drum. The total drum disposal costs are, therefore, about $6,000 per
year.

8.3.10  Analytical Services Costs

Required sampling frequencies are highly site specific and are based on treatment goals and contaminant
concentrations.  Analytical costs associated with a ground-water treatment project include the costs of
laboratory analyses, data reduction, and QA/QC. This analysis assumes that one sample of untreated
(upgradient) water, one sample of treated water (downgradient), and associated QC samples (trip blanks,
                                               105

-------
field duplicates, and matrix spike/matrix spike duplicates) will be analyzed for VOCs every month.
Monthly analytical costs are estimated at $1,500. The total annual analytical costs are, therefore,
estimated to be $18,000.

8.3.11   Equipment Maintenance Costs

Typically, annual equipment maintenance costs are estimated to about 3% of the capital equipment costs.

8.3.12   Site Demobilization Costs

Site demobilization includes treatment system shutdown, disassembly, and decontamination; site cleanup
and restoration; utility disconnection; and transportation of the equipment off site. A two-person crew will
work about five 8-hour days to disassemble and load the system. This analysis assumes that the
equipment will be transported 1,000 miles either for storage or to the next job site. Generally, it is
estimated that the total cost of demobilization is about $15,000.  This total includes all labor, material, and
transportation costs.

According to Table 8-1, the vendor stated that demobilization costs were minimal due to the proximity of
the demonstration site to Envirogen's office. Elements of demobilization could include the following:

                   1.      Labor associated with equipment decommissioning and removal;
                  2.      Demobilization of staff;
                  3.      Subcontractor costs associated with abandonment of demonstration wells;
                  4.      Removal of above-grade distributions lines and equipment; and
                  5.      Site restoration.

Equipment decommissioning and removal and demobilization of staff at the NBVC demonstration site was
accomplished in one-half day due to assistance from NBVC staff and would not be expected to exceed 3 days at
the full scale.

8.4   CONCLUSIONS OF ECONOMIC ANALYSIS

This analysis presents cost estimates for treating contaminated ground water with the Envirogen treatment
system at pilot scale for a typical gas station. Table 8-1 presents the total cost as provided by Envirogen
                                              106

-------
for each cost category. Permitting and regulatory costs are not representative because they represent less
than the normal costs. In addition, Effluent Treatment and Disposal Costs are not included in Table 8-1,
since there are no cost estimates for this category. With Envirogen's assumptions (Section 8.2.3), the total
cost to treat 81,000 gallons of contaminated ground water was estimated to be $2.35 per gallon.

In parallel to a cost estimate for a typical gas station, a cost estimate for the field demonstration at
hazardous waste sites was presented. According to this analysis, one time costs (fixed costs) include site
preparation, permitting and regulatory, mobilization and startup, equipment, and site demobilization.
Annual costs include labor, supplies, utilities, effluent treatment and disposal, residual waste shipping and
handling, analytical services, and equipment maintenance. This analysis of the technology shows that
operating costs are strongly affected by the site specific environment, size and configuration of the vendor
system, distance from the Envirogen office location with most of the annual  costs per gallon being
proportionally higher than estimated during this cost analysis, as presented in Table 8-1.
                                               107

-------
                                         SECTION 9
                        TECHNOLOGY APPLICATIONS ANALYSIS

This section of the report addresses the general applicability of the Envirogen technology for treating
contaminated ground water at hazardous waste and petroleum release sites. The analysis is based
primarily on the demonstration results at the NBVC, and conclusions are based exclusively on these data
since only limited information is available on full-scale applications of the technology.  This
demonstration was conducted over a ten-months period during June 2001 to March 2002. Vendor's claims
regarding the effectiveness and applicability of the Envirogen technology are included in Appendix A.

This section also discusses the following topics regarding the applicability of the Envirogen technology:
technology performance versus Applicable or Relevant and Appropriate Requirements (ARAR),
technology operability, key features of the treatment technology, applicable wastes, availability and
transportability of equipment, material handling requirements, range of suitable site characteristics,
limitations of the technology, and potential regulatory requirements.

9.1    TECHNOLOGY PERFORMANCE VERSUS ARARS

The technology's ability to comply with existing federal,  state, or local ARARs (for example, MCLs)
should be determined on a site-specific basis.  The discussion below focuses on the demonstration at the
NBVC for MTBE-contaminated ground water.

For the MTBE technologies demonstration program at the NBVC, ARARs  were identified and
established by consensus among the stakeholders for the technology demonstration. ARARs included
EPA and California Primary and Secondary MCLs for drinking water and California Public Health Goals
for drinking water. For this demonstration, the contaminants initially present in the ground water which
were of primary concern included  MTBE and TEA (Table 2-3). Although TEA, a partially oxidized
organic compound resulting from MTBE degradation was of concern, for the demonstration of this
technology, MTBE was the only ground-water parameter that was identified as applicable.

In the demonstration at the NBVC, the Envirogen technology did not meet the treatment goals based on
MCLs for the primary contaminants of concern.  MTBE remained in the downgradient  monitoring wells
and was higher in concentration than potentially applicable ARARs.
                                             108

-------
In summary, according to the vendor, the Envirogen technology has been shown to be capable of reducing
85 percent of MTBE contaminants in ground water to below 70 |Jg/L in a pilot-scale study conducted at a
gas station in New Jersey. For hydrocarbons, including BTEX and MTBE, compliance with MCLs may
be problematic if BTEX compounds are the main contaminants of concern. Additionally, the presence of
TEA, partially oxidized organic compound, may be of concern to ARAR compliance at specific sites,
depending on the application and the planned disposal or reuse of the downgradient water from the
Envirogen system. The following were identified as additional potential technology performance issues
with respect to ARARs:

        •       The technology's ability to meet any future chemical-specific ARARs for by-products
               may be considered because of the potential for formation of TEA, partially oxidized
               organic during treatment.

        •       States may require SVE for system operation.

9.2     TECHNOLOGY OPERABILITY

The operation of the demonstration system involves the use of compressed gas cylinders to provide the
source of oxygen and propane and simple timer-actuated solenoid valves to control flow.  Therefore, the
principal factor affecting Envirogen system performance is the  delivery of the gases into solution. Tasks
associated with the operation and maintenance of the system included routine flow and pressure
measurements at the injection point, monitoring oxygen and propane use, and changing spent gas
cylinders.

Propane biostimulation technology uses commercially available, off-the-shelf components to  establish
bioreactive treatment zones.  Equipment used in the performance and monitoring of the demonstration is
available through standard suppliers. The routine monitoring of the control system by the study
participants indicated the use of a more sensitive control system would enhance optimum operating
conditions.

Although Envirogen claims that their system can treat shallow aquifers, the presence of a deep water table
could add to the cost and operating difficulties of the operation of the Envirogen technology.  Also, as
discussed earlier, the system would be less effective in aquifers with low hydraulic conductivities. The
type of aquifers for which the Envirogen process is most effective include those composed of sand to

                                              109

-------
cobbles and with hydraulic conductivities greater than 10~4 cm/sec.  The irregular distribution of oxygen
and propane caused by heterogeneities would result in zones where little or no treatment can occur.
Biochemical factors that must be present include microbes capable of degrading the contaminants of
concern, the availability of nutrients, and a neutral pH.  Other operating parameters that influence the
performance of the Envirogen technology include the presence of excess propane.

9.3    KEY FEATURES OF THE TREATMENT TECHNOLOGY

Common methods for treating ground water contaminated with organic compounds include air stripping,
steam stripping, carbon adsorption, biological treatment, and chemical oxidation. The Envirogen system
is an in-situ technology that allows on-site treatment of contaminated ground water without excavation
and with limited site preparation.

In situ treatment is advantageous, especially when volatile organic compounds are present since handling
activities may be minimized.  These technologies have the potential for the complete destruction of the
contaminants rather than transferring them to another medium.

Envirogen operation involves injecting propane and oxygen into an  MTBE-contaminated aquifer. The
addition of these substrates promotes the growth of propane oxidizing bacteria (FOB) and the production
of the enzyme propane monooxygenous that catalyzes the complete  destruction of MTBE and its primary
daughter product, TEA. The injection of exogenous FOB such as strain ENV 425 is used to seed the
aquifer to insure activity or speed initiation of the treatment process.

The Envirogen system does not generate residue,  sludge, or spent media that require  further processing,
handling, or disposal. As the target organic compound, MTBE is either mineralized or broken down into
low molecular weight compounds. When complete destruction occurs, produced intermediate species are
ultimately oxidized to CO2 and water.

9.4    APPLICABLE WASTES

Based on Envirogen's claim, as well as results from a pilot scale demonstration at a gas station in New
Jersey and other laboratory studies, the Envirogen technology may have applicability to treat MTBE in
liquids, including ground water and wastewater. Where stringent effluent requirements apply, such as the

                                              110

-------
demonstration at NBVC site, the technology does not appear to be particularly applicable to the treatment
of contaminated ground waters containing MTBE. However, the technology can achieve substantial
reductions in the concentrations of other petroleum hydrocarbons.

9.5      AVAILABILITY AND TRANSPORTABILITY OF EQUIPMENT

The vendor provides the complete Envirogen treatment system configured for site-specific conditions. All
Envirogen treatment equipment is leased to the client. As a result, all depreciation and salvage value is
incurred by Envirogen, which is reflected in the price for leasing the equipment. At the end of a treatment
project, Envirogen decontaminates and demobilizes its treatment equipment. Envirogen assumes that this
equipment will operate for the duration of the ground-water remediation project and will still function
after the remediation is complete as a result of routine maintenance and modifications.

9.6     MATERIALS HANDLING REQUIREMENTS

Other than the soil cuttings generated during installation of the demonstration injection points, monitoring
wells, and vapor monitoring points, and ground water derived from sampling during the demonstration,
the Envirogen system does not generate treatment residuals that require further processing, handling, or
disposal. Depending on various states, requirements, the Envirogen unit may require air emissions
specific controls.

If MCLs are achieved, treated water then may be  disposed of either on or off site, depending on
site-specific requirements and limitations. Examples of on-site disposal options for treated water include
ground-water recharge or temporary on-site storage  for sanitary use. Examples of off-site disposal options
include discharge  into surface water bodies, storm sewers, and sanitary sewers.  Bioassay tests may be
required in addition to routine chemical and physical analyses before the treated water is disposed.

9.7     RANGE OF SUITABLE SITE CHARACTERISTICS

In addition to the quality of ground water entering the system and downgradient discharge requirements,
site characteristics and support requirements are important when considering the Envirogen technology.
Site-specific factors can impact the application of the Envirogen technology, and these factors should be
considered before selecting the technology for remediation at a specific site. Site-specific factors
addressed in this section include site support requirements and utility requirements.

                                              Ill

-------
According to Envirogen, both transportable and permanently installed Envirogen systems are available
(see Section 10 Technology Status, and Appendix A, Vendor's Claims for the Technology). The support
requirements for these systems are likely to vary. This section presents support requirements based on the
information collected for the permanently installed system used during the demonstration.

9.7.1   Site Support Requirements

The main site requirement is the availability of electricity. For the unit used during the demonstration, a
3-phase, 206V power was utilized. The system controls operated using conditioned power reduced to
24V AC power to the individual timers and solenoid valves.  These voltages are standard unit grid
voltages available in the United States. Other utilities required for the use of Envirogen include water for
cleaning; only small amounts of potable water are required. Access to the site must be provided over
roads suitable for travel by heavy equipment. Personnel must also be able to reach the site without
difficulty. An additional area is required for an office or laboratory building and for the storage of the
equipment. A fence surrounds the Envirogen site to provide additional security. The fence should be
posted with signs for "explosion hazard," and no smoking should be permitted anywhere on site. During
the demonstration, an area of about 61 feet by 172 feet was used for the Envirogen plots, an EPA shed
area, and miscellaneous equipment.

If the portable unit is used, the site must be accessible for a tractor-trailer truck with an 8-foot by 28-foot
trailer weighing about 10 tons. An area 8 feet by 28 feet must be available for the trailer that houses the
Envirogen system, and additional space must be available to allow personnel to move freely around the
outside of the trailer. The area containing the Envirogen trailer should be paved or covered with
compacted soil or gravel to prevent the trailer from sinking into soft ground.

9.8    LIMITATIONS OF THE TECHNOLOGY

Because the biostimulation technology is an extension of conventional  air sparging and biosparging
techniques, its application is generally limited by the same hydrologic factors that prevent conventional
sparging.  Sites that are characterized by low permeability formations, such as silts or clays, or
heterogeneous soil conditions are the primary obstacles to successful treatment.

Another issue of concern for this technology is the risk of explosion caused by propane addition. Air
sparging technologies have long been used for remediating gasoline contamination, thereby generating

                                               112

-------
potentially explosive gaseous vapors of gasoline components and oxygen.  In addition to water table
mounding caused by the injection of treatment gases, system operation was limited in placing the gases
into solution with the exception of those parts of the aquifer in proximity to the injection locations.
During the time the propane injection system was operating, its odor was very pronounced at the surface.

Another limiting factor has been identified based on the principles of monoxygenous response to the
mixture of contaminants. Based on research studies performed by Envirogen and demonstration results,
the system is the most efficient if the MTBE concentrations significantly exceed the BTEX constituents in
contaminated ground water being treated by the Envirogen system. If treatment goals are not met while
the system operates, such a case would require operating additional Envirogen units in series, obtaining a
larger Envirogen unit, or adding pretreatment or post-treatment, any of which would increase costs.

9.9    POTENTIAL REGULATORY REQUIREMENTS

This section discusses regulatory requirements pertinent to use of the Envirogen technology at Superfund
and RCRA corrective action sites. The  regulations applicable to implementation of this technology
depend on site-specific  remediation logistics and the type of contaminated liquid being treated; therefore,
this section presents a general overview of the types of federal regulations that may apply under various
conditions. State requirements should also be considered because they vary from state to state and,
therefore, are not presented in detail in this section.

Depending on the characteristics of the ground water to be treated, pretreatment or post-treatment may be
required for the successful operation of the Envirogen system. Each pretreatment or post-treatment
process might involve additional regulatory requirements that would need to be determined in advance.
No direct air emissions  are generated by the Envirogen treatment process.  Therefore, only regulations
addressing contaminated ground-water treatment and discharge, potential fugitive air emissions, and
additional considerations are discussed below.

Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA)

The CERCLA of 1980, as amended by the Superfund Amendments and Reauthorization Act (SARA) of
1986, provides for federal funding to respond to releases or potential releases of any hazardous substance
into the environment, as well as to releases of pollutants or contaminants that may present an imminent or
significant danger to public health and welfare or to the environment.

                                              113

-------
As part of the requirement of CERCLA (EPA ,1988; 1989), the EPA has prepared the National Oil and
Hazardous Substances Pollution Contingency Plan (NCP) for hazardous substance response. The NCP is
codified in Title 40, Code of Federal Regulations (CFR), part 300, and delineates the methods and criteria
used to determine the appropriate extent of removal and cleanup for hazardous waste contamination.

SARA states a strong statuary preference for innovative technologies that provide long-term protection
and directs EPA to do the following:

       •       Use remedial alternatives that permanently and significantly reduce the volume, toxicity,
              or mobility of hazardous substances, pollutants, or contaminants;

       •       Select remedial options that protect human health and the environment, are cost-effective,
              and involve permanent solutions and alternative treatment or resource recovery
              technologies to the maximum extent possible; and

       •       Avoid off-site transport and disposal hazardous substances or contaminated materials
              when practicable treatment technologies exist [Section 121 (b)].

Although during this demonstration, the above stated criteria were not met, a successful in-situ
technology would meet each of these requirements. In general, two types of responses are possible under
CERCLA: removal and remedial action.  Superfund remedial actions are conducted in response to an
immediate threat caused by a release of hazardous substances. Removal action decisions are documented
in an action memorandum.  Many removals involve small quantities of waste or immediate threats
requiring quick action to  alleviate the hazard. Remedial actions are governed by the SARA amendments
to CERCLA.  As stated above, these amendments promote remedies that permanently reduce the volume,
toxicity, and mobility of hazardous substances, pollutants, or contaminants.

On-site removal and remedial actions must comply with federal and often more stringent state ARARs.
ARARs are determined on a site-by-site basis and may be waived under six conditions: (1) the action is
an interim measure, and the ARAR will be met at completion; (2) compliance with the ARAR would pose
a greater risk to health and the environment than noncompliance; (3) it is technically impracticable to
meet the ARAR;  (4) the standard of performance of an ARAR can be met by an equivalent method; (5) a
state ARAR has not been consistently applied elsewhere; and (6) ARAR compliance would not provide a
balance between the protection  achieved at a particular site and demands on the Superfund for other sites.
                                             114

-------
These waiver options apply only to Superfund actions taken on-site, and justifications for the waiver must
be clearly demonstrated.

Resource Conservation and Recovery Act

RCRA, an amendment to the Solid Waste Disposal Act (SWDA), is the primary federal legislation
governing hazardous waste activities and was passed in 1976 to address the problem of how to safely
dispose of municipal and industrial waste. Subtitle C of RCRA contains requirements for generation,
transport, treatment, storage, and disposal of hazardous waste, most of which are also applicable to
CERCLA activities. The Hazardous and Solid Waste Amendments of 1984 greatly expanded the scope
and requirements of RCRA.

EPA and RCRA-authorized states (listed in 40 Code of Federal Regulations [CFR] Part 272) implement
and enforce RCRA and state regulations. Some of the RCRA requirements under 40 CFR Part 264
Subpart F (promulgated) and Subpart S (partially promulgated) generally apply at Comprehensive
Emergency Response, Compensation, and Liability Act (CERCLA) sites that contain RCRA hazardous
waste because remedial actions generally involve treatment, storage, or disposal of hazardous waste.
Subparts  F and S include requirements for initiating and conducting RCRA corrective action, remediating
ground water, and ensuring that corrective actions comply with other environmental regulations. Subpart
S also details conditions under which particular RCRA requirements may be waived for temporary
treatment units operating at corrective action sites and provides information regarding requirements for
modifying permits to adequately describe the subject treatment unit.

According to Envirogen, the propane biostimulation technology can treat ground-water contaminated with
petroleum hydrocarbons and MTBE. Contaminated ground water treated by the system may be classified
as a RCRA hazardous waste or may be sufficiently similar to a RCRA hazardous waste that RCRA
regulations will be applicable requirements.

Clean Water Act

The objective of the Clean Water Act (CWA) is to restore and maintain the chemical, physical, and
biological quality of navigable surface waters by establishing federal, state, and local discharge standards.
If treated ground water is discharged to surface water bodies or publicly owned treatment works (POTW),
CWA regulations apply. On-site discharges to surface water bodies must meet substantive National

                                              115

-------
Pollutant Discharge Elimination System (NPDES) requirements but do not require an NPDES permit. A
direct discharge of (CERCLA) wastewater would qualify as "onsite" if the receiving water body is in the
area of contamination or in proximity to the site, and if the discharge is necessary to implement the
response action. Off-site discharges to a surface water body require an NPDES permit and must meet
NPD ES permit limits. Discharge to a POTW is considered to be an off-site activity, even if an on-site
sewer is used. Therefore, compliance with substantive and administrative requirements of the National
Pretreatment Program is required in such a case. General pretreatment regulations are included in 40
(CFR) Part 403.

Any applicable local or state requirements, such as local or state pretreatment requirements or water
quality standards (WQS), must also be identified and satisfied. State WQSs are designed to protect
existing and attainable surface water uses (for example, recreation and public water supply). WQSs
include surface water use classifications and numerical or narrative standards (including effluent toxicity
standards, chemical-specific requirements, and bioassay requirements to demonstrate no observable effect
level [NOEL] from a discharge) (EPA 1988). These standards should be reviewed on a state- and
location-specific basis  before discharges are made to surface water bodies.

Safe Drinking Water Act

The Safe Drinking Water Act (SOWA) of 1974, as most recently amended by the Safe Drinking Water
Amendments of 1986,  required EPA to establish regulations to protect human health from contaminants
in drinking water. EPA has developed the following programs to achieve this objective: (1) a drinking
water standards program, (2) an underground injection control program, and (3) sole-source aquifer and
well-head protection programs.

SDWA primary (or health-based) and secondary (or aesthetic) MCLs generally apply as cleanup
standards for water that is, or may be, used as drinking water. In some cases,  such as when multiple
contaminants are present, more stringent maximum contaminant level goals (MCLG) may be appropriate.
In other cases, alternate concentration limits (ACL) based on site-specific conditions may be applied.
CERCLA and RCRA standards and guidance should be used in establishing ACLs (EPA 1987). During
the demonstrations, Envirogen treatment system performance was tested for compliance with SDWA
MCLs for MTBE as  a critical VOC.
                                              116

-------
Water discharge through injection wells is regulated by the underground injection control program.
Injection wells are categorized as Classes I through V, depending on their construction and use.
Reinjection of treated water involves Class IV (reinjection) or Class V (recharge) wells and should meet
SDWA requirements for well construction, operation, and closure. If the ground water treated is a RCRA
hazardous waste, the treated ground water must meet RCRA Land Disposal Restriction (LDR) treatment
standards (40 CFRPart 268) before reinjection.

The sole-source aquifer and well-head protection programs are designed to protect specific drinking water
supply sources. If such a source is to be remediated using the Envirogen system, appropriate program
officials should be notified, and any potential regulatory requirements should be identified. State ground-
water antidegradation requirements and (WQSs) may also apply.

Clean Air Act

The Clean Air Act (CAA), as amended in  1990, regulates stationary and mobile sources of air emissions.
CAA regulations are generally implemented through combined federal, state, and local programs. The
CAA includes chemical-specific standards for major stationary sources that would not be applicable but
could be  relevant and appropriate for Envirogen system use. For example, because of the nature of the
Envirogen process, which is a biosparging, the potential for stripping of VOCs and off-gassing of propane
and oxygen may require SVE operation. Therefore, the Envirogen system may need to be controlled to
ensure that air quality is not impacted. The National Emission Standards for Hazardous Air Pollutants
(NESHAP) could also be relevant and appropriate if regulated hazardous air pollutants are emitted and if
the treatment process is considered sufficiently similar to one regulated under these standards. In addition,
New Source Performance Standards (NSPS) could be relevant and appropriate if the pollutant emitted and
the Envirogen system are sufficiently similar to a pollutant and source category regulated by an NSPS.
Finally, state and local air programs have been delegated significant air quality regulatory responsibilities,
and some have developed programs to regulate toxic air pollutants (EPA 1989). Therefore, state air
programs should be  consulted regarding Envirogen treatment technology installation and use.

Toxic Substances Control Act

Testing, premanufacture notification, and record-keeping requirements  for toxic substances are regulated
under the Toxic Substances Control Act (TSCA). TSCA also includes storage requirements for
polychlorinated biphenyls (PCB) (see 40 CFR §761.65). The Envirogen system may be used to treat

                                              117

-------
ground water contaminated with PCBs, and TSCA requirements would apply to pretreatment storage of
PCB-contaminated liquid. TCA was not an ARAR at the NBVC demonstration.

Occupational Safety and Health Act

OSHA regulations in 29 CFR Parts 1900 through 1926 are designed to protect worker health and safety.
Both Superfund and RCRA corrective actions must meet OSHA requirements, particularly § 1910.120
which describes safety and health regulations for construction sites. On-site construction activities at
Superfund or RCRA corrective action sites must be performed in accordance with 1926 of OSHA, which
describes safety and health regulations for construction sites. For example, electric utility hookups for the
Envirogen system must comply with Part 1926, Subpart K, Electrical.

In addition to meeting the OSHA requirements for the Envirogen treatment gases (for example, Part 1926,
Subpart D, Occupational Health and Environmental Controls, and Subpart H, Materials Handling,
Storage, and Disposal), all technicians operating the Envirogen system and all workers performing on-site
work must have completed the OSHA training course and must be familiar with all OSHA requirements
relevant to hazardous waste sites, in particular with those pertaining to the vendor's treatment gases,
oxygen and propane, material safety data information as stated in 29 CFR 1910, Subpart Z. State OSHA
requirements, which may be more stringent than federal standards, must also be met. In addition, health
and safety plans for site remediations should address chemicals of concern and include monitoring
practices to ensure that worker health and safety are maintained.

State and Community Acceptance

Because few applications of the Envirogen technology have been attempted beyond the bench or pilot
scale, limited information is available to assess state and community acceptance of the technology.
During the demonstrations at the NBVC, more than 100 people from regulatory agencies, nearby
universities, and the local community attended Visitors' Day to observe demonstration activities and ask
questions pertaining to the technology. The visitors expressed no concerns regarding operation of the
Envirogen system.
                                              118

-------
                                     SECTION 10
                               TECHNOLOGY STATUS

Envirogen claims that their technology can be used for the remediation of contaminated ground
water, especially when contaminated with MTBE and TEA.  However, at the NBVC
demonstration site, the Envirogen technology failed to remove MTBE to the compliance level of
5 |Jg/L.  There are currently no commercially operating systems in the United States.

The equipment and materials necessary to install the Envirogen technology are readily available.
Prior to  installation, the subsurface hydrogeology, waste distribution, waste characteristics, and
ground-water chemistry must be characterized. Envirogen uses a three-phase approach in
implementing its propane biostimulation technology.  During phase 1, a bench-scale treatability
study is  performed using aquifer materials and a small quantity of ground water to construct
microcosms.  The purpose of this phase is to determine the abundance of indigenous bacteria at a
site and  their potential for the removal of MTBE.  The results from microcosm studies are also
used to determine if bioaugmentation is required.  During phase 2, a pilot-scale treatability study
is conducted on site using Envirogen's trailer mounted system.  The results of this study will be
used to (1) determine the effectiveness of the technology under site conditions, (2) design a full-
scale system to meet treatment goals, and (3) provide duration and cost estimates for full-scale
system operation. During phase 3, a full-scale operation of the technology will be implemented.

10.1    PREVIOUS EXPERIENCE

In addition to this demonstration, Envirogen's bioaugmentation and biostimulation technology
has been applied for the remediation of MTBE contaminated ground water at an operating
gasoline service station in New Jersey. During that project, which was conducted following an
air sparging project, Envirogen utilized pre-existing sparging and SVE wells, with slight
modification, for the injection of oxygen and propane as well as capturing the excess of propane.
Envirogen claims that, as a result of the application of their technology at this service  station, a
significant amount of MTBE was reduced. Envirogen further claims that, although the TEA
concentrations in the ground water increased during MTBE degradation, it was orders  of
magnitude lower than the MTBE concentrations.
                                          119

-------
10.2   SCALING CAPABILITIES

The specifics of the components of the system utilized during this demonstration are provided in
Section 1.3 and the cost per unit estimate is provided in Section 8.  Additionally, the vendor
claims that a variety of the systems from a small portable to the large permanent systems are
available to accommodate sites with different volumes of contaminated ground water. Since the
systems are modular in nature, once the treatment design is completed, installation of the
equipment can take from one week to one month depending on regulatory requirements, the
number of injection wells, and the complexity of the treatment system.
                                         120

-------
                                 REFERENCES

Aeschbach-Hertig, W., Schlosser, P., Stute, M, Simpson, H. J., Ludin, A., and Clark, J. F.
1998. A 3Fi/3He Study of Ground Water Flow in a Fractured Bedrock Aquifer.  Ground Water
36(4): 661-670.

American Waterworks Association (AWWA). 1998. Standard Method for the Examination of
Water and Wastewater, 20th Edition. American Public Health Association, American Water
Works Association and Water Environmental Federation.

Benner, M. L., Stanford, S. M., Lee, L. S., and Mohtar, R. H. 2000.  Field and Numerical
Analysis of In-Situ Air Sparging: A Case Study. J. Hazard. Mater. 72(2-3): 217-236.

Bernauer, U., Amberg, A., Scheutzow, D., and Dekant, W. 1998. Biotransformation of 12C-
and 2-13C-Labeled Methyl fert-Butyl Ether, Ethyl fert-Butyl Ether, and fert-Butyl Alcohol in
Rats:  Identification of Metabolites in Urine by 13C Nuclear Magnetic Resonance and Gas
Chromatography/Mass Spectrometry. Chem. Res. Toxicol. 11: 651-658.

Bianchi, A. and Varney, M. S. 1989. Analysis of Methyl tert-Butyl Ether and 1, 2-
Dihaloethanes in Estuarine Water and Sediments Using Purge-and-Trap/Gas-Chromatography.
J. High Resolut. Chromatogr. 12: 184-186.

Bonin, M. A., Ashley, D. L., Cardinali, F. L., McCraw, J. M., Wooten, J. V.  1995.
Measurement of Methyl tert-Butyl Ether and fert-Butyl Alcohol in Human Blood by Purge-
and-Trap Gas Chromatography- Mass Spectrometry Using an Isotope-Dilution Method.  J.
Anal. Toxicol.  19: 187-191.

Borden, R. C., Daniel, R. A., LeBrun, L. E., and Davis, C. W.  1997. Intrinsic Biodegradation
of MTBE and BTEX in a Gasoline-Contaminated Aquifer. Water Resour. Res. 33(5): 1105-
1115.

Bowman, R. S. and Gibbens, J. F. 1992. Difluorobenzoates as Nonreactive Tracers in Soil and
Ground Water. Ground Water 30(1): 8-14.

Bullivant, D. P., and O'Sullivan, M. J. 1989. Matching a Field Tracer Test with some Simple
Models. Water Resour. Res. 25(8):  1879-1891.

Church, C. D., Isabelle, L. M., Pankow, J. F., Rose, D. L., and Tratnyek, P. G. 1997a.  Method
for Determination of Methyl tert-Butyl Ether and its Degradation Products in Water. Environ.
Sci. Technol. 31(12): 3723-3726.

Church, C. D., Isabelle, L. M., Pankow, J. F., Tratnyek, P. G., and Rose, D. L. 1997b.
Assessing the In Situ Degradation of Methyl  fert-Butyl Ether (MTBE) by Product
Identification at the Sub-PPB Level Using Direct Aqueous Injection GC/MS. Division of
Environmental Chemistry Preprint of Extended Abstracts 37(1): 411-413.

Church, C. D., Pankow, J. F., and Tratnyek, P. G. 1999a. Hydrolysis of tert-Butyl Formate:
Kinetics, Products, and Implications for the Environmental Impact of Methyl fert-Butyl Ether.
Environ. Toxicol. Chem. 18(12): 2789-2796.
                                       121

-------
Church, C. D., Tratnyek, P. G., Pankow, J. F., Landmeyer, J. E., Baehr, A. L., Thomas, M. A.,
and Schirmer, M. 1999b. Effects of Environmental Conditions on MTBE Degradation in
Model Column Aquifers. U. S. Geological Survey, Water Resources Investigations Report 99-
4018C, 3:93-101.

Church, C. D., Tratnyek, P. G., and Scow, K. M. 2000. Pathways for the Degradation of
MTBE and Other Fuel Oxygenates by Isolate PM1. Am. Chem. Soc. 40(1): 261-263.

Clayton, W. S., Brown, R. A., and Bass, D. H.  1995. Air Sparging and Bioremediation: The
Case for In Situ Mixing. In Situ Aeration: Air sparging, bioventing, and related remediation
processes 3(2):  75-85.

Code of Fedral  Regulations (CFR). 1002. Title 40. Part 136.

Connell, L. D.  1994. The Importance of Pulse Duration in Pulse Test Analysis. Water
Resour. Res. 30(8): 2403-2411.

Davis, G. B., Patterson, B. M., Thierrin, J., Benker, E.  2000. Deuterated Tracers for Assessing
Natural Attenuation in Contaminated Groundwater.  In Proceedings of Tracers and Modeling
in Hydrogeology of the TraM'2000 Conference in Liege, Belgium. IAHS no. 262: 241-247.
Englewood Cliffs, New Jersey.

EPA. 1987. Alternate Concentration limit (ACL) Guidance. Part 1: ACL Policy and
Information Requirements. EPA/530/SW-87/017.

EPA. 1988. CERCLA Compliance with Other Environmental Laws: Interim Final. OSWER.
EPA/540/G-89/006.

EPA. 1989. CERCLA Compliance with Other Laws Manual: Part II. Clean Air Act and Other
Environmental  Statutes and State Requirements. OSWER. EPA/540/G-89/006.

EPA. 1995. Methods for the Determination of Organic Compounds in Drinking Water, EPA
600/4-88/039. With Supplements II (1992) and III (1995).

EPA. 1996. Test Methods for Evaluating Solid Waste, Physical/Chemical Methods, Laboratory
Manual, Volumes 1A through 1C, and Field Manual, Volume 2. SW-846, Third Edition and
Update III, EPA document control no. 955-001-0000-1 Office of Solid Waste. September.

Evans, G. 1990. Estimating Innovative Treatment Technology Costs for the SITE Program. J.
Air Waste Management Assoc. 40(7): 69-83, July.

Everett, L. G., Cullen, S. J., Rice, D. W., McNab Jr., W. W. Dooher, B. P., Kavanaugh, M. C.,
Johnson, P. C.,  Kastenberg, W. E., Small, M. C.  1998. Risk-Based Assessment of Appropriate
Fuel Hydrocarbon Cleanup Strategies for the Naval Exchange Gasoline Station Naval
Construction Battalion Center Port Hueneme, California.  UCRL-AR-130891.

Gamier, P. M.,  Auria, R., Augur, C., and Revah, S.  1999.  Cometabolic Biodegradation of
Methyl t-Butyl  Ether by Pseudomonas Aeruginosa Grown on Pentane. Appl. Microbiol.
Biotechnol. 51: 489-503.
                                      122

-------
Gullick, R. W., and LeChevallier, M. W. 2002 Occurrence of MTBE in Drinking Water
Sources.  J. Am. Waterworks Assoc. 92(1): 100-113.

Gupta, S. K., Lau, L. S., and Moravcik, P. S.  1994. Ground-Water Tracing with Injected
Helium. Ground Water 32(1): 96-102.

Hanson, J. R., Ackerman, C. E., and Scow, K. M.  1999.  Biodegradation of Methyl tert-Butyl
Ether by a Bacterial Pure Culture. Appl. Environ. Microbiol. 65(11): 4788-4792.

Hardison, L. K., Curry, S. S., Ciuffetti, L.M., and Hyman, M. R.  1997.  Metabolism of Diethyl
Ether and Cometabolism of Methyl tert-Butyl Ether by a Filamentous Fungus, a Graphium sp.
Appl. Environ. Microbiol. 63(8): 3058-3067.

Hyman, M., Kwon, P., Williamson, K., and O'Reilly, K.  1998.  Cometabolism of MTBE by
Alkane-Utilizing Microorganisms.  In G. Wickramanayake, B. Hinchee, E. Robert (Eds.),
Natural Attenuation; Chlorinated and Recalcitrant Compounds, 3: 321-325. Battelle Press,
Columbus, OH.

Jensen, H. M. and Arvin, E.  1990.  Solubility and Degradability of the Gasoline Additive
MTBE, Methyl-fert.-butyl-ether, and Gasoline Compounds in Water. Contam. Soil: 445-448.

Ji, W.,  Dahmani, A., Ahlfeld, D. P., Lin, J. D., Hill III, E. 1993.  Laboratory Study of Air
Sparging: Air Flow Visualization. GWMR 13(4): 115-126.

Johnson, P. C., Johnson, R. L., Neaville, C.,  Hansen, E. E., Stearns, S. M., and Dortch, I. J.
1997. An Assessment of Conventional In Situ Air Sparging Pilot Tests. Ground Water 35(5):
765-774.

Johnson, R. L. 1994. Enhancing Biodegradation with In Situ Air Sparging:  A Conceptual
Model. Air Sparging for Site Remediation 2(5):  14-22.

Johnson, R. L., Johnson, P. C., McWhorter, D. B., Hinchee, R. E., and Goodman, I.  1993. An
Overview of In Situ Air Sparging. GWMR:  127-135.

Kanal,  H., Inouye, V., Goo, R, Chow, R, Yazawa, L., and Maka, J. 1994.  GC/MS Analysis
of MTBE, ETBE, and TAME in Gasoline. Anal. Chem. 66(6): 924-927.

Kenoyer, G. J. 1988. Tracer Test Analysis of Anisotropy in Hydraulic Conductivity of
Granular Aquifers. GWMR: 67-70.

Keppel, Geoffrey, Design and Analysis: A Researcher's Handbook, 1982, Prentice-Hall, Inc.,
New York, NY.

Kostecki, P. T. Calabrese, E. J.,  Bonazountas, M. 1997. Contaminated Soils Volume 2. Site
Assessment Chemical Analysis and Environmental Fate Risk Assessment, Remediation
Bioremediation, State Regulatory Federal and Military Considerations Federal and Military
Considerations Manufactured Gas Plant Sites, Radioactivity, MTBE. Amherst Scientific
Publishers. 661-679.

Meiri, D.  1989. A Tracer Test for Detecting Cross Contamination Along a Monitoring Well
Column.  GWMR: 78-81.
                                       123

-------
Melville, J. G., Molz, F. J., Guven, O., and Widdowson, M. A. 1991. Multilevel Slug Tests
with Comparisons to Tracer Data. Ground Water 29(6): 897-907.

Mo, K., Lora, C. O., Wanken, A. E., Javanmardian, M., Yang, X., and Kulpa, C. F. 1999.
Biodegradation of Methyl T-Butyl Ether by Pure Bacterial Cultures. Appl. Microbiol.
Biotechnol. 47: 69-72.

Nouri, B., Fouillet, B., Toussaint, G., Chambon, R., and Chambon, P. 1996. Complementary
of Purge-and-Trap and Head-space Capillary Gas Chromatographic Methods for Determination
of Methyl-fert.-Butyl Ether in Water.  J. Chromatogr. A, 726: 153-159.

Pankow, J. F., Johnson, R. L., and Cherry, J. A. 1993. Air Sparging in Gate Wells in Cutoff
Walls and Trenches for Control of Plumes of Volatile Organic Compounds (VOCs). Ground
Water 31(4): 654-663.

Pankow, J. F., Thomson, N. R., Johnson, R. L., Baehr, A. L., and Zogorski, J. S.  1997. The
Urban Atmosphere as a Non-Point Source for the Transport of MTBE and Other Volatile
Organic Compounds (VOCs) to Shallow Groundwater. Environ. Sci. Technol. 31(10): 2821-
2828.

Parker, J. C., and van Genuchten, M. Th. 1984.  Determining Transport Parameters from
Laboratory and Field Tracer Experiments. Virginia Agricultural Experiment Station, Virginia
Polytechnic Institute and State University Bulletin 84-3: 1-97.

Patrick, G. C., and Barker, J. F. 1985.  A Natural-Gradient Tracer Study of Dissolved
Benzene, Toluene and Xylenes in Ground Water.  Second Canadian/American Conference on
Hydrogeology. 141-147.

Poulson, S. R., Drever, J. I. and Colberg, P. J. S.  1997.  Estimation of Koc Values for
Deuterated Benzene, Toluene, and Ethylbenzene, and Application to Ground Water
Contamination Studies. Chemosphere 35: 2215-2224.

Poulson, S. R., Ohmoto, H. and Thomas, P. R.  1995. Stable Isotope Geochemistry of Waters
and Gases (CO2, CFL,) from the Overpressured Morganza and Moore-Sams Fields, Louisiana
Gulf Coast. Appl. Geochem.  10: 407-417.

Reuter, J. E., Allen, B. C., Richards, R. C., Pankow, J. F., Goldman, C. R., Scholl, R. L., and
Seyfried, J. S.  1998.  Concentrations, Sources, and Fate of the Gasoline Oxygenate Methyl
tert-Butyl Ether (MTBE) in a Multiple-Use Lake. Environ. Sci. Technol. 32(23): 3666-3672.

Rice, D. W., Grose, R. D., Michaelsen, J. C., Dooher, B. P., MacQueen, D. H., Cullen, S. J.,
Kastenberg, W. E., Everett, L. G., Marino, M. A. 1995.  California Leaking Underground Fuel
Tank (LUFT) Historical Case Analyses. California State Water Resources  Control Board
Underground Storage Tank Program and the Senate Bill 1764 Leaking Underground Fuel Tank
Advisory Committee UCRL-AR-122207.

Ronen, D., Berkowitz, B., and Magaritz, M.  1993. Vertical Heterogeneity in Horizontal
Components of Specific Discharge: Case Study Analysis. Ground Water 31(1): 33-40.
                                       124

-------
Salanitro, J. P., Johnson, P. C., Spinnler, G. E., Maner, P. M., Wisniewski, H. L., and Bruce, C.
2000. Field-Scale Demonstration of Enhanced MTBE Bioremediation Through Aquifer
Bioaugmentation and Oxygenation. Environ. Sci. Technol. 34: 4152-4162.

Salanitro, J. P., Spinnler, G. E., Neaville, C. C., Maner, P. M., Stearns, S. M., Johnson, P. C.,
and Bruce, C. 1999.  Demonstration of the Enhanced MTBE Bioremediation (EMB) In Situ
Process. In-Situ Bioremediation of Petroleum Hydrocarbon and other Organic Compounds
5(3): 37-46.

Schirmer, M., Butler, B. J., Barker, J. F., Church, C. D., and Schirmer, K. 1999. Evaluation of
Biodegradation and Dispersion as Natural Attenuation Processes of MTBE and Benzene at the
Borden Field Site. Phys. Chem. Earth (B) 24(6): 557-560.

Smith, R. L., Harvey, R. W., and LeBlanc, D. R.  1991. Importance of Closely Spaced Vertical
Sampling in Delineating Chemical and Microbiological Gradients in Groundwater Studies. J.
Contamin. Hydrol. 7: 285-300.

Stevenson, D., Paling, W. A. J. and De Jesus, A. S. M. 1989.  Radiotracer Dispersion Tests in
a Fissured Aquifer. J. Hydrol. 110:  153-164.

Stute, M., Deak, J., Revesz, K., Bohlke, J. K., Deseo, E., Weppernig, R., and Schlosser, P.
1987. Tritium/3He Dating of River Infiltration: An Example from the Danube in Szigetkoz
Area, Hungary. Ground Water 35(5): 905-911.

Suflita, J. M., and Mormile, M. R.  1993. Anaerobic Biodegradation of Known and Potential
Gasoline Oxygenates in the Terrestrial Subsurface. Environ. Sci. Technol. 27(5):  976-978.

SYSTAT, 1990. The System for Statistics, Evanston, IL, SYSTAT, Inc.

Thierren, J., Davis, G. B., Barber, C., and Power, T. R.  1992. Use of Deuterated Organic
Compounds as Groundwater Tracers for Determination of Natural Degradation Rates Within a
Contaminated Zone.  In H.  Hotzl and A. Werner (Eds.), Tracer Hydrology, 85-91.  A. A.
Balkema, Rotterdam.

Thierrin, J., Davis, G. B., and Barber, C. 1995. A Ground-Water Tracer Test with Deuterated
Compounds for Monitoring In Situ Biodegradation and Retardation of Aromatic
Hydrocarbons. Ground Water 33(3): 469-475.

Thierrin, J., Davis, G. B., Barber, C., Patterson, B. M., Pribac, F., Power, T. R., and Lambert,
M.  1993. Natural Degradation Rates of BTEX Compounds and Naphthalene in a Sulphate
Reducing Groundwater Environment. J. Sci. Hydrol. 38(4): 309-322.

White, G. F., Russell, N. J., and Tidswell, E. C. 1996. Bacterial Scission of Ether Bonds.
Microbiol. Rev. 60(1): 216-232.

Yen, C. K., and Novak, J. T.  1994. Anaerobic Biodegradation of Gasoline Oxygenates in
Soils. Water Environ. Res. 66(5): 744-752.
                                       125

-------
                                         APPENDIX A
                                     VENDOR'S CLAIMS

This appendix was generated and written solely by Envirogen. The statements presented herein represent
the vendor's point of view and summarize the claims made by the vendor, Envirogen (Lawrenceville,
New Jersey), regarding their in-situ propane biostimulation technology. Publication herein does not
represent the EPA's approval or endorsement of the statements made in this section; the EPA's point of
view is discussed in the body of this report.

A.I    Introduction

MTBE has been used extensively as a gasoline additive in the United States to enhance combustion
efficiency and reduced vehicle emissions, and its widespread use has ultimately led to its accidental
release in the environment.  Because it is present in high concentrations in reformulated gasoline and
highly soluble in groundwater (Kow 1.05), even small releases of gasoline can result in large MTBE
plumes. The incidence of spills of MTBE-containing fuels from confirmed leaking underground storage
tanks (USTs) in the United States has been estimated to be as high as 250,000. Sites contaminated with
MTBE can vary in size from large terminals owned by multinational corporations to small family-owned
service stations located near residential neighborhoods.  Remedial technologies for treating MTBE,
therefore, must be efficient, cost effective, and adaptable to a wide range of site conditions and
limitations.  Traditional remedial technologies such as activated carbon adsorption and air-sparging have
proven to be largely ineffective or expensive for treating MTBE contamination, and it is clear that no
single technology is suitable for every contaminated site. Recently, bioremediation has emerged as a
suitable remedial alternative for some sites, and it can be applied by stimulating indigenous MTBE-
degrading bacteria, or by adding exogenous bacteria, depending on conditions at the target site.

A.2    Biostimulation Technology Description

Biostimulation is a process by which the degradative activity of indigenous or added microorganisms is
enhanced by adding specific nutrients or co-substrates that might otherwise be lacking or limiting. Often,
indigenous microbes can be stimulated simply by adding a missing terminal electron acceptor like
oxygen. Because some contaminants are not good growth substrates for indigenous bacteria,
biostimulation sometimes can be facilitated by adding a co-metabolic growth substrates. Co-metabolism

                                              A-l

-------
is a process by which the same enzyme that degrades a good growth substrate also fortuitously degrades
the contaminant, often with little or no benefit to the degradative organisms.  We demonstrated that
propane oxidizing bacteria can co-metabolically mineralize MTBE to CO2 and H2O after growth on
propane (Steffan et al.,  1997). Because other hydrocarbon gases, such as methane and butane, have been
used to stimulate co-metabolic biodegradation processes in situ, it is likely that a similar application of
biostimulation, whereby propane and oxygen are injected to stimulate MTBE degradation by indigenous
organisms or seed cultures, is feasible at some sites (US Patent # 5,814,514, Sept. 29,  1998).

There are several potential advantages to using a co-metabolic biostimulation approach for degrading
MTBE in situ. Co-metabolism uncouples biodegradation of the contaminant from growth of the
organisms. That is, the microbes can be supplied sufficient co-substrate (e.g., propane) to support growth,
so they do not have to rely on the utilization of low levels of contaminants to maintain their survival.
Also, the technology can be applied in a number of configurations depending on site characteristics and
treatment needs. Possible application scenarios include: 1) re-engineered or modified multi-point
AS/SVE systems that deliver propane and air throughout a contaminated site (suitable  for use with
existing AS/SVE systems or specially designed systems); 2) a series of air/propane delivery points
arranged to form a permeable treatment wall to prevent off site migration of MTBE; 3) permeable
treatment trenches fitted with air and propane injection systems; 4) in situ recirculating treatment cells
that rely on pumping and reinjection to capture and treat a migrating contaminant plume; and 5) propane
and oxygen injection through bubble-free gas injection devices to minimize off-gas release and
contaminant stripping. Furthermore, propane is widely available, transportable even to remote sites,
already present at many gasoline stations, and relatively inexpensive. Thus, propane biostimulation has
the potential to be an attractive remediation option at a wide variety of MTBE-contaminated sites.

A.3    Demonstration results

During this project, we applied and evaluated propane biostimulation for MTBE remediation at the Port
Hueneme, CA National Environmental Technologies Test Site. The primary purposes of this field
demonstration included:
       •  Evaluating the effectiveness of propane biostimulation for MTBE remediation
       •  Optimizing sparging and SVE flow rates and injection/extraction cycles;
       •  Quantitatively assessing the impact of propane sparging on soil gas  and ambient air quality;
       •  Delineating the zone of influence of the treatment;
                                              A-2

-------
       •   Assessing the potential for subsurface gas migration and fugitive emissions; and,
       •   Assess our ability to degrade MTBE to less than 5 |ig/L with a single row of propane and
           oxygen injection points.

Microcosm testing with samples from the site revealed that the resident groundwater had low indigenous
MTBE degrading microbial activity, even though MTBE degradation by native organisms has been
observed during other demonstrations near our test plots. Consequently, we elected to seed our Test plot
with a seed culture of propane oxidizing bacteria to initiate biodegradation

During the demonstration MTBE was degraded in both our Test (propane, oxygen, and bacteria added)
and Control Plot (no propane added), but in neither case were the MTBE concentrations maintained at
below the desired level of 5 |ig/L. However, low levels of MTBE were achieved in many of the
monitoring wells. For example, MTBE concentrations in the first row of deep Test Plot monitoring wells,
GWT-2D, GWT-3D, and GWT-4D, went from 850, 1440, and 1440 |ig/L at the beginning of the
treatment (6/12/01) to 19, 46, and 440 |ig/L at the end of treatment (3/12/02), respectively. Mean MTBE
concentrations in the second row of monitoring wells went from 1967 |lg/L (+/- 556 |lg/L; n=3) to 148
|lg/L (+/- 88 |lg/L; n=3) during the same period. Likewise, MTBE concentrations of <5 |lg/L were
achieved in at least two of the shallow monitoring wells  in the test plot.  These low levels were achieved
despite the addition of dMTBE as a tracer by the EPA which increased the total load of MTBE to the test
plots. Variability in groundwater flow through the plots, and temporally during the course of the
demonstration, appeared to affect distribution of co-substrates and oxygen in the test plot, and it made it
difficult to accurately quantify the extent of MTBE degradation in the plots.

At the end of the field demonstration, experiments were  performed to isolate MTBE degrading organisms
from both the Test and Control Plot.  Enrichment culturing with propane as a carbon source allowed
growth of propane/MTBE degrading  microorganisms from the Test Plot, but not from the Control Plot.
Isolated propanotrophs from the  Test Plot were  phenotypically different (colony morphology and color)
than the Rhodococcus ruber ENV425 culture added to the aquifer. Organisms able to grow on MTBE as
a sole carbon source were isolated from both plots. These results suggest that the addition of propane to
the Test Plot did allow growth of indigenous propane oxidizing microorganisms that were able to degrade
MTBE. Similarly, addition of oxygen to both plots appeared to stimulate the growth of indigenous
microbes capable of growth on MTBE.
                                             A-3

-------
Response to oxygen addition in the Control Plot was more rapid than anticipated based on microcosm
studies performed by us, and based on prior demonstrations at the site.  This high level of activity
frustrated analysis of the effect of propane biostimulation on MTBE degradation at the site.  Likewise,
changes in the groundwater flow also made analysis of the data difficult.  For example, because
degradation rate calculations are dependent on groundwater flow, and because the hydraulic gradient was
flat and the flow was low at the site,  even small variations in flow could significantly affect degradation
rate calculations. Groundwater elevation data even suggested that groundwater flow may have reversed
its flow direction periodically during the study, especially in the Test Plot.  Thus, unlike our prior
demonstration where the positive effects of propane biostimulation were obvious (see below) the effects
are less apparent in results of this study.

This demonstration also demonstrated that propane biosparging can be safely and economically applied at
the field scale.  Application of the technology resulted in no measurable fugitive emissions of propane,
and in situ biodegradation and controlled propane addition maintained propane levels near or below its
detection limit in groundwater. Propane costs for the 10-month demonstration were only about
$50/month, indicating that application of this technology costs little more than a traditional air sparging
system. Because of low propane emissions, the technology should not require secondary containment
systems (e.g., soil vapor extraction) in most cases.  Thus, it may be cost effective to incorporate propane
biosparging equipment into MTBE remediation designs, even at sites where MTBE biodegradation by
indigenous organisms is suspected.  If indigenous bacteria prove to be inefficient or ineffective at
remediating the site, propane can be  injected to enhance activity at minimal additional cost.

Results of this demonstration also suggested that most of the active MTBE degradation that occurred in
both plots occurred near the oxygen injection points.  Thus, degradation activity may have been limited
by the availability of oxygen in the subsurface. Oxygen was likely consumed by both geochemical
oxygen sinks and biological activity. Because of the process monitoring and technology validation
procedures of both Envirogen and the EPA, we elected not to increase gas flows into the site during this
demonstration.  To reach even lower MTBE levels, however, either additional rows of oxygen injection
points or higher oxygen loading  rates may be needed.

A.4    Case Study

Introduction. Propane biostimulation for MTBE remediation was applied at an operating Camden
County, New Jersey service station site. A site investigation was initiated at the site after one of the site's

                                              A-4

-------
underground gasoline tanks failed a tightness test in July 1988. The site has since undergone a range of
remedial actions including soil excavation and air sparging. Six on-site groundwater monitoring wells
(MW-5 to MW-10) and two offsite wells (MW-11 and MW-12) were installed to monitor BTEX and
MTBE (Figure A-l). These wells are currently being monitored on a quarterly basis. Groundwater
samples collected on February 9, 1999 showed site MTBE concentrations ranging from 170 |lg/L (at
upgradient monitoring well MW-8) to 270,000 |lg/L (MW-6). Historical groundwater MTBE data from
1990 to 1999 indicate increasing concentrations  at monitoring wells MW-6, MW-7, MW-9 and MW-11.

Because of the failure of air sparging and soil vapor extraction to sufficiently remove MTBE from the site
groundwater, Envirogen was asked to perform propane biostimulation at the site.  A biosparging and
propane injection system was designed to allow  flexible and safe implementation in the field. The system
consisted of injection and SVE components, and utilize existing sparge wells (SP-1, SP-2 and SP-3) and
SVE wells (VP-1, VP-2 and MW-10) at the site. The injection system consisted of two separate
components; an air compressor and a propane supply system that was connected to the existing sparging
distribution lines via a common manifold. An in-line filter was installed on the injection line to remove
moisture and/or oil escaping the air compressor.  The SVE system consisted of a vacuum blower that was
connected to the existing SVE distribution lines  and a carbon  canister for treatment of the off-gas.
Operation of the system was controlled using a common control panel with redundant control switches to
ensure safe operations. An interlock devise was used to prevent propane injection unless the SVE system
was operational.

Because the existing air sparging wells were not designed and constructed for pulsed operation, operation
of the wells in a pulsed mode resulted in an accumulation of silt in the wells and reduced airflow.
Consequently, the sparging system was operated with a continuous low airflow of 13 scfm. A 10-pound
propane gas cylinder (e.g., similar in size to home barbecue propane tanks) was used as the propane
supply. The discharge from the propane cylinder was controlled by a flow valve and pressure indicator
mounted on the cylinder.  A pressure control valve set at 40 psi was utilized to monitor and control the
propane pressure in the line. An in-line propane lower explosive limit (LEL) detector was installed to
continuously monitor the LEL level and  ensure safe operation of the system. Dedicated flow meters were
installed on each line to control the flow to each sparge well.  Propane was added to the air stream for 10
min every three hours at a rate that ensured that the propane concentration did not exceed 0.2% propane
in air (10% of the propane LEL). Approximately 0.5 Ibs. of propane and 315 Ibs. of oxygen were added
to the site  each day.
                                              A-5

-------
Results.  Preliminary laboratory studies revealed that the site had low levels of indigenous
microorganisms, presumably because of the low groundwater pH (pH ~3.5 to 5). Therefore, we elected to
seed the aquifer with R. ruber ENV425.  The system was initially operated for approximately one month
without the addition MTBE degrading microorganisms.  A total of 17 L of culture of strain  ENV425 (~ 1
x 1011 cells/ml) was then added to the three sparge points.  Bacterial injection was followed by several
cycles of air sparging to help distribute the microbes into the treatment zone, and two days of continuous
propane and air sparging to aid in establishing an active MTBE degrading microbial population. Because
the low measured pH in ground water at the site, the ground water needed to be buffered to raise the pH to
a range more favorable to MTBE biodegradation.  A buffer solution of sodium bicarbonate  was added to
the sparge point periodically during the demonstration to achieve this goal.  During each buffering event,
a total of 120 gallons of a sodium bicarbonate solution was added to the sparge points followed
immediately by air sparging to disperse the buffer into the formation.The  system was operated for an
additional ~5 months before a scheduled shutdown.  MTBE and BTEX concentrations in the groundwater
were measured using EPA method 8260.

Groundwater monitoring during the project was performed in monitoring  wells MW-6, MW-7, MW-9,
and MW-11 (Figure A-l). MW-6 is located just upgradient of the treatment zone, but it was slightly
influenced by the treatment as indicated by increased dissolved oxygen in the groundwater during the
treatment system operation. MW-7 also was upgradient of the treatment wells, but clearly within the zone
of influence of the propane and oxygen injection system. MW-9 was immediately down gradient of the
sparging points, and MW-11 was far down gradient  of the treatment system.

MTBE concentrations in MW-6 were reduced by approximately 40% during the 5-month treatment
period (Figure  A-2A). Likewise, MTBE concentration is MW-7 were
reduced by as much as 76% during bio stimulation treatment (Figure A-2B). MTBE concentrations in
MW-9 were reduced by as much as 98%, from 88 mg/L to  1.7 mg/L, during the treatment period (Figure
A-2C). MTBE concentrations in MW 11 were relatively constant during the 5-month treatment period
(data not shown), presumably because it was  too far down gradient for treated water did not reach it
during the demonstration period.  First order rate  constants for MW-6, MW-7 and MW-9 were calculated
to be 0.0084, 0.0288, and 0.0027/day,  respectively.
                                             A-6

-------
                                                         Sparge Points
                                                         Monitoring Wells
                                                      A SVE Wells
Figure A-l. Field site and system layout. Propane and air were injected into three existing air sparging
points (Spl, Sp2, and Sp3), and MTBE concentrations were measured in MW6, MW7, MW9, and
MW11.
                                               A-7

-------
                      350
                          Jul/12 Jul/20 Sep/14Sep/28 Oct/12 Oct/27 Nov/28 Dec/14 Dec/20 Jan/3 Jan/I/Jan/Si

                                                     Date
                           Jul/12 Jul/20 Sep/14Sep/28 Oct/12 Oct/27 Nov/28 Dec/14 Dec/20 Jan/3 Jan/I/Jan/Si
                                                     Date
                    D)


                   LU
                   DQ
                                Treatment Initiated
                                                     MW9      Treatment Terminated
                        20
                           Jul/12 Jul/20 Seryi4Sep/28 Oct/12 Oct/27 Nov/28 Dec/14 Dec/20 Jan/3 Jan/I/Jan/Si
                                                      Date

Figure A-2.  MTBE concentrations in groundwater at on-site monitoring wells at a Camden County, New
Jersey service station before, during, and after propane biostimulation treatment.
                                                       A-8

-------
This corresponded to MTBE half-lives of 82, 24, and 30 days, respectively. After nearly 5 months of




operation the treatment system was shut down.  In each of the treatment zone monitoring wells the MTBE




concentration rebounded to near pre-treatment levels (see Figure A-2A-C). The rebound effect was




attributed to a continuing source of MTBE contamination at the site.  Ongoing work at the site has led to a




repair of the leakage source and implementation of an expanded treatment system for full-scale




remediation of the site, including the source area.









TEA concentrations in the site groundwater increased during MTBE biodegradation, but they were




typically several orders of magnitude lower than MTBE concentrations. During our initial work with




propane oxidizing bacteria, pure cultures produced nearly stoichiometric concentrations of TEA from




MTBE (Steffan et al., 1997).  TEA concentrations in the cultures decreased only after MTBE was




completely degraded. At this site, however, TEA was apparently degraded simultaneously with MTBE




because it did not accumulate to levels near the initial MTBE concentration.  Furthermore, TEA




concentrations declined rapidly after propane injection was terminated and MTBE degradation ceased.




The decline in TEA concentrations was accompanied by a decline in oxygen concentration. These data




suggest that the  propane oxidizers continued to degrade TEA after propane was no longer available to




induce MTBE degradation, or that other TEA degraders were present in the system.  During microcosm




studies with ENV425 the organisms degraded TEA to <5 |lg/L, indicating that similar levels will be




achieved in the field provided the treatment period is sufficiently long.









The results of the case  study showed that MTBE-contaminated groundwater can be biologically




remediated using propane oxidizing bacteria and propane biosparging.  This site presented a number of




unique challenges to this technology, including low pH, high MTBE concentrations, and a continuing




source of MTBE. Nonetheless, a significant mass of MTBE was removed during this demonstration, and




MTBE reductions of greater than 90% were achieved in a relatively short time. The results also suggest




that this treatment approach also supports the degradation of TEA.




                                             A-9

-------
Propane proved to be an excellent substrate for biostimulation applications; it is widely available,




transportable even to remote sites, and relatively inexpensive. Application of propane injection in the




field, however, may raise concerns about creating explosive mixtures of propane and air in situ. To




address these concerns we injected propane in pulses and did not exceed 10% of the LEL of propane in




the injection gas.  We also used SVE to prevent in situ accumulation of propane. The results of our




monitoring, however,  suggest that propane stripping is minimal and SVE is likely unnecessary at most




sites.









Technology Costs.  Estimates of the cost of implementing the propane biostimulation system are similar




to the costs of applying conventional air sparging/biosparging at a service station site. During the case




study, propane costs were only $240 for the entire 6 months of operation.  The primary equipment cost




for the application is a biosparging system that safely blends low levels  of propane with sparging air.  A




typical system, fully engineered, constructed and mounted in a trailer is expected to costs approximately




$35,000, but the mobile system is  suitable for repeated use at multiple sites, or it could be returned to a




site to remediate future MTBE releases.  Stationary systems can be installed at a lower cost.   Based on




the results of the project,  future applications of the technology probably will not require the use of SVE




during biosparging, saving both the equipment and discharge permit costs.  It also  is recommended that




pre-design treatability studies be performed with site groundwater and soil. These  tests are expected to




cost ~ $4,000.  Addition  of seed cultures, when needed, is expected to cost -$1000 to $2000 per




application depending on the size of the site. The technology also can be applied in a number of




alternative configurations — some employing existing systems — depending on site characteristics and




treatment needs.  Thus, the complexity of the site and the selection of an application design will




ultimately determine the total cost of the system.
                                              A-10

-------
A.5    Summary









Propane biostimulation is a useful and economical in situ treatment alternative for remediating MTBE




contaminated groundwaters.  The technology is very flexible and can be combined with other traditional




technologies like air sparging and soil vapor extraction to enhance the removal of MTBE from




groundwater. Importantly, the technology also promotes the removal of TEA from groundwater.




Because TEA is highly water soluble and not easily removed by air sparging, soil vapor extraction, or




carbon adsorption, the ability to simultaneously remove MTBE and TEA in a single treatment process,




and in situ, should present a considerable cost savings to users of the technology.  Demonstrations




performed to date show that the technology can be applied safely with little risk of fugitive propane




emissions or accumulation in the subsurface.









Propane biostimulation should be considered as a remedial alternative for sites where air sparging or the




addition of oxygen alone does not support MTBE remediation (see Case Study above).  Likewise, it




should be considered in regions of the country where TEA in groundwater also is tightly regulated.




Furthermore, the potential application of propane biostimulation should be considered when installing an




air sparging system at an MTBE contaminated site. By creating a flexible system that will allow the




subsequent application of propane injection in the event that air sparging alone is not sufficient,




considerable cost savings can potentially be realized in overall treatment costs.  Similarly, the subsequent




addition of propane for in situ biostimulation should be considered when planning the use of other




technologies such as cut-off trenches and bioaugmentation with MTBE degrading microbes. In all cases,




it is recommended that treatability studies be performed prior to designing and implementing propane




biostimulation systems. Treatability studies can provide information about the availability of indigenous




MTBE-degrading propane oxidizing microorganisms and provide insight regarding propane and oxygen




loading requirements and the presence of geochemical conditions that could limit microbial activity (e.g.,




low pH).




                                             A-ll

-------
A. 6   References Cited and Additional Suggested Information

Steffan, R. J., McClay, K., Vainberg, S., Condee, C. W., and Zhang, D. 1997. Biodegradation of the
Gasoline Oxygenates Methyl tert-butyl ether, Ethyl fert-butyl ether, and tert-Amyl ether by Propane-
Oxidizing Bacteria. Appl. Environ. Microbiol. 63: 4216-4222.

Steffan, R. J., Y. Farhan, C. W. Condee, and S. Drew. 2002. Bioremediation at a New Jersey Site Using
Propane-Oxidizing Bacteria. In: Ellen Moyer and Paul Kostecki (Eds.), Chapter 27: MTBE Remediation
Handbook, Amherst Scientific Publisher, Amherst, MA (in press).

Steffan, R. J., P.B. Hatzinger, Y. Farhan, and S. Drew. 2001. In Situ and Ex Situ Biodegradation of
MTBE and TEA in Contaminated Groundwater. In Proceedings of the 2001 Petroleum Hydrocarbons and
Organic Chemicals in Ground Water: Prevention, Detection, and Remediation Convention and
Exposition, Nov.  14-16, Houston, TX, The National Groundwater Association, Westerville, OH,  pp.252-
264.

Steffan, R.J., P.B. Hatzinger, Y. Farhan, and S.R. Drew. 2001.  In Situ and Ex Situ Biodegradation of
MTBE and TEA in Contaminated Groundwater. In Proceedings of the National Groundwater Association
Conference on Petroleum Hydrocarbons and Organic Chemicals in Ground Water: Prevention, Detection,
and Remediation. Nov. 14-16, Houston, TX, pp.252-264.

Steffan, R. J., C. Condee, J. Quinnan, M. Walsh, S. H. Abrams, and J. Flanders. 2000. In Situ Application
of Propane Sparging for MTBE Bioremediation. In G.B. Wickramanayake, A. R. Gavaskar, B.C.
Alleman, and V. S. Magar (Eds.), Bioremediation and Phytoremediation of Chlorinated and Recalcitrant
Compounds. Battelle Press, Columbus, OH,  pp. 157-165.

Steffan, R. J., S. Vainberg, C. W.  Condee, K. McClay and P. Hatzinger. 2000. Biotreatment of MTBE
with a New Bacterial Isolate. In G.B. Wickramanayake, A. R. Gavaskar, B.C. Alleman, and V. S. Magar,
(Eds.), Bioremediation and Phytoremediation of Chlorinated and Recalcitrant Compounds.  Battelle
Press, Columbus, OH,  pp.165-173.

Vainberg, S, A. P. Togna, P. M. Sutton, and R.J. Steffan. 2002. Treatment of MTBE-Contaminated
Water in a Fluid Bed Bioreactor (FBR). J. Environ. Engineer 128:842-851.
                                            A-12

-------
&EPA
       United States
       Environmental Protection
       Agency

       National Risk Management
         Research Laboratory
       Cincinnati, OH 45268

       Official Business
       Penalty for Private Use
       $300
Please make all necessary changes on the below label,
detach or copy, and return to the address in the upper
left-hand corner.

If you do not wish to receive these reports CHECK HERED;
detach, or copy this cover, and return to the address in the
upper left-hand corner.