EPA/540/2-89/054C
                          October 1989
Evaluation of Ground-Water
    Extraction Remedies

             Volume 3
         General Site Data
        Data Base Reports
            Interim Final
            October 1989
  Office of Emergency and Remedial Response
     U.S. Environmental Protection Agency
         Washington, D.C 20460

-------
                                   Notice
Development  of  this document was  funded by  the  United  States Environmental
Protection  Agency  in part  under  contract  No.  68-W8-0098  to  CH2M  HILL
SOUTHEAST. It has been subjected to the Agency's review process and approved for
publication as an  EPA document.

The policies and procedures  set out in this document are intended solely for the
guidance of response personnel. They are not intended, nor can they be relied upon,
to create any rights, substantive or procedural,  enforceable by any party in litigation
with the United States. The Agency reserves the  right to act at  variance witn these
policies and procedures and to change them at any time without public notice.

-------
                      INTRODUCTION
This volume is the third of a three-volume report document-
ing the results of an evaluation of ground-water extraction
remedies at hazardous waste sites.  It consists of a collec-
tion of 112 data base reports presenting general information
on sites where ground-water extraction systems are in vari-
ous stages of planning or implementation.  This information
was collected under EPA Contract No. 68-W8-009B.

Volume 1 is the summary report presenting the general conclu-
sions and observations of the study.  It is based on a theo-
retical review and on a series of detailed case studies of
individual sites.  Volume 1 describes the methodology of the
study, the factors that influence the effectiveness of
ground-water extraction systems, and the data requirements
for the design of extraction systems.

Volume 2 presents 19 case studies of individual sites where
ground-water extraction systems have been implemented.
The case studies discuss site characteristics and the per-
formance of the ground-water extraction  systems at the
selected sites in considerably greater detail than the data
base  reports presented here.
WDCR13/032.WP

-------
                                Table of Contents
     Site Name

25TH STREET WELLFIELD
AIR PRODUCTS & CHEMICALS
AIRCO
AMERICAN CYANAMID
AMERICAN CYANAMID
AMERICAN WOOD TREATING
AMPHENOL
ANDERSON CORPORATION
ANNISTON ARMY DEPOT
AREA D — McCLELLAN AFB
BALDWIN POLE & PILING
BAYOU BONFOUCA
BERKS SAND PIT
BF GOODRICH
BFI/CECOS
BLACK AND DECKER
BLOSENSKI LANDFILL
BOEING OF PORTLAND
BTL SPECIALTY RESINS CORP
BURLINGTON NORTHERN RR
CAPE FEAR WOOD PRESERVING
CAVENHAM CORPORATION
CAVENHAM CORPORATION
CHEMTRONICS SITE
CIBA - GEIGY
COLEMAN-EVANS WOOD PRESRV
CONOCO REFINING
COOPER BIOMEDICAL, INC.
DBS MOINES TCE
DISTLER BRICKYARD
DISTLER FARM
DRAKE CHEMICAL
DUPONT - AXIS
ELECTRONIC CONTROLS CORP.
ELECTRONIC INDUSTRIES
EMERSON ELECTRIC
ENSCO
EVANITE BATTERY SEPARATOR
FAIRCHILD SEMICONDUCTOR
FERNWOOD WOOD TREATING CO
FMC CORPORATION
FMC CORPORATION
FORD CO
FRONTIER HARD CHROME
FRUEHAUF CORPORATION
GEIGER/CSM OIL
GENERAL ELECTRIC/EAST ST
GENERAL ELECTRIC/PINNELAS
GENERAL MILLS
Page

  1
  2
  3
  4
  5
  6
  7
  8
  9
 10
 11
 12
 13
 14
 15
 16
 17
 18
 19
 20
 21
 22
 23
 24
 25
 26
 27
 28
 29
 30
 31
 32
 33
 34
 35
 36
 37
 38
 39
 40
 41
 42
 43
 44
 45
 46
 47
 48
 49

-------
                                 Table of Contents
Site Name

GENRAD CORPORATION
GILSON ROADS
GREAT LAKES CHEMICAL CORP
GROVELAND WELLS
HARRIS CORPORATION
HELEVA LANDFILL
HOECHST/CELANESE NPL SITE
IBM - DAYTON
IBM — SAN JOSE
INDIAN BEND WASH
INTERNATIONAL PAPER CO.
KURT MANUFACTURING
M-AREA SAVANNAH RIVER PLT
MEPCO/ELECTRA
MILLCREEK
MOBAY CORPORATION
MOBAY CORPORATION
NATIONAL STARCH & CHEM...
NICHOLS ENGINEERING
NORTHERN TELECOM
NORTHSIDE LANDFILL
OLIN CHEMICAL
OLIN CORP
PALMETTO WOOD
PENSACOLA NAVAL AIR STA.
PERDIDO
PERMAPOST PRODUCTS CO.
PHOENIX-GOODYEAR AIRPORT
PONDERS CORNER
REICHHOLD CHEMICAL
REICHHOLD PENSACOLA
ROCKY MOUNTAIN ARSENSAL
ROLLINS - BATON ROUGE
SAPP BATTERY
SCRDI/DIXIANA NPL SITE
SEYMOUR RECYCLING
SIDNEY MINE
SITE A
SODYECO SITE
SPARTAN TECHNOLOGY
STAUFFER - ICI
TEXAS EASTMAN
TEXAS ECOLOGISTS
TIME OIL SITE
TOMAH PRODUCTS
TOWER CHEMICAL
TUSCON INT'L AIRPORT AREA
UN-NAMED
UNION CARBIDE, PONCE
UNITED CHROME PRODUCTS
Page

  50
  51
  52
  53
  54
  55
  56
  57
  58
  59
  60
  61
  62
  63
  64
  65
  66
  67
  68
  69
  70
  71
  72
  73
  74
  75
  76
  77
  78
  79
  80
  81
  82
  83
  84
  85
  86
  87
  88
  89
  90
  91
  92
  93
  94
  95
  96
  97
  98
  99
                                     111

-------
                                Table of Contents
Site Name

UPJOHN
UTAH POWER & LIGHT CO.
VERONA WELL FIELD
VILLE MERCIER, QUEBEC
W.R. GRACE
WAMCHEM SITE
WESTERN PROCESSING
WHITTACKER SITE
WILSON CORNERS  (KSC)
WOOD TREATING, INC.
WURTSMITH AFB
WYCKOFF EAGLE HARBOR
ZELLWOOD
Page

100
101
102
103
104
105
106
107
108
109
110
111
112
                                      iv

-------
             EVALUATION OF GROUNDWATER EXTRACTION REMEDIES
                     EPA CONTRACT NO.  68-W8-009B
                           GENERAL SITE DATA

                            DATA BASE REPORT
 X.   Site name  and location/EPA Region
     25TH  STREET  WELLFIELD,  FL      IV

 2.   Program
     Other,  MUNICIPAL

 3.   Contact person
     ROBERT F.  CARR/FT.  PIERCE UTILITIES  AUTHORITY

 4.   Objective  of  Groundwater Extraction

     Interim objective(s)... Unknown
     Final objective(s)... Well  head treatment

 5.   Type of Extraction System and System Enhancements;
     Drilled Wells,  no system enhancements

 6,   Type of Site
     Other, WELL  FIELD

 7.   What type  of  contaminants are involved?
     Low sorption, Organics

 8.   Are nonaqueous liquids  present?
     No

 9.   What are the  aquifer materials?

      Sand     Other...SHELL

10.   Describe special features of interest.
11.  What stage in the study/design/implementation process is this site?
     Is extraction in progress?
      Extraction began in 1985.

12.  Dates of ROD or other milestones

-------
              EVALUATION OF GROUNDWATER EXTRACTION REMEDIES
                      EPA CONTRACT NO.  68-W8-009B
                            GENERAL SITE DATA

                             DATA BASE REPORT
 1.  Site name and location/EPA Region
      AIR PRODUCTS & CHEMICALS, NJ     II

 2.  Program
      State Lead, ECRA

 3.  Contact person
      KEN SMITH/NJ DEP

 4.  Objective of Groundwater Extraction

      Interim objective(s)... Unknown
      Final objective(s)...  Aquifer restoration

 5.  Type of Extraction System and System Enhancements;
      Drilled Wells,  Reinjection

 6.  Type of Site
      Manufacturing/processing plant

 7.  What type of contaminants are involved?
      Low sorption,  Organics

 8.  Are nonaqueous  liquids  present?
      Yes,  Less dense than water.

 9.  What are the aquifer materials?

      Silt   Sand

10.  Describe special features of interest.
      Soil  flushing  in the vadose zone with infiltration beds.

11.  What stage in the study/design/implementation process is this site?
     Is extraction in progress?
      In construction stage,  no extraction in progress

12.  Dates  of ROD or other milestones

-------
             EVALUATION OF GROUNDWATER EXTRACTION REMEDIES
                     EPA CONTRACT NO.  68-W8-009B
                           GENERAL SITE DATA

                            DATA BASE REPORT
1.  Site name and location/EPA Region
     AIRCO, WV     III

2.  Program
     RCRA, AND STATE LEAD

3.  Contact person
     JEROME CIBRIK/WV DNR

4.  Objective of Groundwater Extraction

     Interim objective(s)... Unknown
     Final objective(s)...  Aquifer  restoration

5.  Type  of Extraction  System and System Enhancements;
 6.
 Unknown,  no system enhancements

Type of Site
 Manufacturing/processing plant
 7.   what  type  of  contaminants  are involved?


 8.   Are nonaqueous  liquids  present?
      No

 9.   What  are the  aquifer materials?

      Interbedded  Sediments

10.   Describe special features  of interest.


11.   what  stage in the study/design/implementation process is this site?
     Is extraction in progress?
12.   Dates of ROD or other milestones

-------
              EVALUATION OF GROUNDWATER EXTRACTION REMEDIES
                      EPA CONTRACT NO.  68-W8-009B
                            GENERAL SITE DATA

                             DATA BASE REPORT
 1.  Site name and location/EPA Region
      AMERICAN CYANAMID, WV     III

 2.  Program
      Other, CWA

 3.  Contact person
      JON HUNDERTMARK/EPA REGION III WATER DIV

 4.  Objective of Groundwater Extraction

      Interim objective(s)... Unknown
      Final objective(s)...  Unknown

 5-  Type of Extraction System and System Enhancements:
      Drilled Wells,  no system enhancements

 6.  Type of Site
      Manufacturing/processing plant

 7.  What type of contaminants are involved?
      Organics and Metals

 8.  Are nonaqueous liquids  present?
      No

 9.  What are the aquifer materials?
     Describe special features of interest.
11 •   What stage in the study/design/implementation process is this site?
     Is extraction in progress?
     Dates of ROD or other milestones

-------
             EVALUATION OF GROUNDWATER EXTRACTION REMEDIES
                     EPA CONTRACT NO.  68-W8-009B
                           GENERAL SITE DATA

                            DATA BASE REPORT
1.  Site name and location/EPA Region
     AMERICAN CYANAMID, FL     IV

2.  Program
     RCRA

3.  Contact person
     NEIL SCHARITZ/AMERICAN CYANAMID, PENSACOLA, FL

4.  Objective of Groundwater Extraction

     Interim objective(s)... Plume containment
     Final objective(s)... Aquifer restoration

5.  Type of Extraction  System and System Enhancements;
     Drilled Wells, no  system enhancements
     SUBMERSIBLE PUMPS

6.  Type of Site
     Manufacturing/processing plant

7.  what type  of contaminants are involved?
     Low sorption,  Organics

8.  Are nonaqueous  liquids present?
     No

 9.  what are  the aquifer materials?

      Sand   Gravel

10.  Describe  special features  of interest.
11.   what stage in the study/design/implementation process  is  this  site?
     Is extraction in progress?
      o  Two recovery wells online since late 1986
      o  Third well is waiting for EPA approval

12.   Dates of ROD or other milestones

-------
              EVALUATION OF GROUNDWATER EXTRACTION REMEDIES
                      EPA CONTRACT NO.  68-W8-009B
                            GENERAL SITE DATA

                             DATA BASE REPORT
10.
Site name and location/EPA Region
 AMERICAN WOOD TREATING, MS     IV

Program
 RCRA

Contact person
 BEVERLY FOSTER/EPA REGION IV, RCRA BRANCH

Objective of Groundwater Extraction

 Interim objective (s) ... Nonaqueous liquid recovery
 Final objective(s)... Aquifer restoration

Type of Extraction System and System Enhancements:
 Drilled Wells, no system enhancements

Type of Site
 Manufacturing/processing plant

What type of contaminants are involved?
 Organics

Are nonagueous liquids present?
 Yes, More dense than water.

What are the aquifer materials?

 Sand

Describe special features of interest.
11.  What stage in the study/design/implementation process is this site?
     Is extraction in progress?
      Finalizing corrective action plan.

12.  Dates of ROD or other milestones

-------
              EVALUATION  OF  GROUNDWATER EXTRACTION REMEDIES
                      EPA CONTRACT NO.   68-W8-009B
                            GENERAL SITE DATA

                             DATA BASE  REPORT
10,
Site name and location/EPA Region
 AMPHENOL,  NY     II

Program
 RCRA,  AND STATE LEAD

Contact person
 WAYNE BARTO/AMPHENOL INC., SIDNEY, NEW YORK

Objective of Groundwater Extraction

 Interim objective(s)...  Aquifer restoration
 Final objective(s)...  Plume containment

Type of Extraction System and System Enhancements;
 Drilled Wells, no system enhancements

Type of Site
 Manufacturing/processing plant

What type of contaminants are involved?
 Organics

Are nonaqueous liquids present?
 No

What are the aquifer materials?

 Silt  Sand  Gravel

Describe special features of interest.
 Flow influenced by nearby river level
11.  What stage in the study/design/implementation process is this site?
     Is extraction in progress?
      o  Soil remediated in late 1986.
      o  Ground-water remediation began in January 1987.

12.  Dates of ROD or other milestones

-------
             EVALUATION OF GROUNDWATER EXTRACTION REMEDIES
                     EPA CONTRACT NO.  68-W8-009B
                           GENERAL  SITE DATA

                            DATA BASE REPORT
1.  Site name  and location/EPA  Region
     ANDERSON  CORPORATION, MN      V

2.  Program
     State  Lead
 3.  Contact  person
     MIKE VENNEWITZ/MPCA

 4.  Objective of Groundwater Extraction

     Interim objective(s)... Plume containment
     Final objective(s)...  Aquifer restoration

 5.  Type of  Extraction System and System Enhancements:
     Drilled Wells,  no system enhancements

 6.  Type of Site
     Manufacturing/processing plant

 7.  What type of contaminants are involved?
     Organics

 8.  Are nonaqueous liquids present?
     Yes, Less dense than water.

 9.  What are the aquifer materials?

     Clay  Sand  Gravel

10.  Describe special features of interest.
      PCP is more dense than water but the mixtures of milltreat E and
     milltreat F is less dense than water.

11.   What stage in the study/design/implementation process is this site?
     Is extraction in progress?
      Pumping in progress as part of interim remedial action:

      Phase  I   =3 wells started in 1982
      Phase  II  = 3 more wells started  in  1983
      Phase  III = 2 more wells started  in  1987

 12.  Dates of ROD or other milestones

-------
              EVALUATION OF GROUNDWATER EXTRACTION REMEDIES
                      EPA CONTRACT NO.   68-W8-009B
                            GENERAL SITE DATA

                             DATA BASE  REPORT
 1.   Site name and location/EPA Region
      ANNISTON ARMY DEPOT,  AL     IV

 2.   Program
      DOD

 3.   Contact person
      JEFF STARN/EPA REGION IV

 4.   Objective of Groundwater Extraction

      Interim objective(s)... Unknown
      Final objective(s)... Aquifer restoration

 5.   Type of Extraction System and System Enhancements;
      Drilled Wells, no system enhancements

 6.   Type of Site
      Ammunition dump,  MANUFAC. PLANT

 7.   What type of contaminants are involved?
      Organics

 8.   Are nonaqueous liquids present?
      No

 9.   What are the aquifer materials?

      Silt

10.   Describe special features of interest.
11.  What stage in the study/design/implementation process is this site?
     Is extraction in progress?
      Final planning for extraction well installation, wells not yet
      installed.

12.  Dates of ROD or other milestones

-------
              EVALUATION OF GROUNDWATER EXTRACTION REMEDIES
                      EPA CONTRACT NO.   68-W8-009B
                            GENERAL SITE DATA

                             DATA BASE REPORT
 1.   Site name and location/EPA Region
      AREA D — McCLELLAN AFB, CA     IX

 2.   Program
      DOD

 3.   Contact person
      ENVIRONMENTAL COORDINATOR/McCLELLAN AFB

 4.   Objective of Groundwater Extraction

      Interim objective(s)... Plume containment
      Final objective(s)...  Aquifer restoration

 5.   Type of Extraction System and System Enhancements:
      Drilled Wells, no system enhancements

 6.   Type of Site
      Hazardous waste dump

 7.   What type of contaminants are involved?
      Low sorption, Organics

 8.   Are nonaqueous liquids  present?
      No

 9.   What are the aquifer materials?

      Clay  Silt  Sand

10.   Describe special features of interest.
11.  What stage in the study/design/implementation process is this  site?
     Is extraction in progress?
      Extraction began in 1987

12.  Dates of ROD or other milestones
                                      10

-------
             EVALUATION OF GROUNDWATER EXTRACTION REMEDIES
                     EPA CONTRACT NO.  68-W8-009B
                           GENERAL SITE DATA

                            DATA BASE REPORT
1.  Site name and location/EPA Region
     BALDWIN POLE & PILING, AL      IV

2.  Program
     RCRA

3.  Contact person
     BEVERLY FOSTER, JOANNE BENANTE/EPA REG IV,  RCRA

4.  Objective of Groundwater  Extraction

     Interim objective(s)...  Nonaqueous liquid recovery
     Final objective(s)... Aquifer restoration

5.  Type of Extraction  System and System Enhancements;
     Drilled Wells, no  system enhancements
     AND TRENCHES

6.  Type of Site
     Manufacturing/processing plant

7.  what type of contaminants are involved?
     Organics

8.  Are nonaqueous  liquids present?
     Yes, More  dense than water.

 9.  What are the aquifer materials?

      Silt   Sand

10.  Describe special  features of interest.
11.   What stage in the study/design/implementation process is this site?
     Is extraction in progress?
      Design/permitting stage

12.   Dates of ROD or other milestones
                                       11

-------
              EVALUATION OF GROUNDWATER EXTRACTION REMEDIES
                      EPA CONTRACT NO.  68-W8-009B
                            GENERAL SITE'DATA'

                             DATA BASE REPORT
10.
Site name and location/EPA Region
 BAYOU BONFOUCA,  LA     VI

Program
 Superfund

Contact person
 ROBERT GRISWOLD/EPA REGION VI

Objective of Groundwater Extraction

 Interim objective(s)... Well head treatment, & NONAQUEOUS R
 Final objective(s)...  Plume containment

Type of Extraction System and System Enhancements;
 Drilled Wells,  no system enhancements

Type of Site
 Other, CREOSOTING

What type of contaminants are involved?
 Organics

Are nonaqueous liquids  present?
 Yes, Some more dense than water and some less dense than water.

What are the aquifer materials?

 Silt  Sand  Fractured Rock

Describe special features of interest.
11.  What stage in the study/design/implementation process is this site?
     Is extraction in progress?
      Pilot system operation just about to begin

12.  Dates of ROD or other milestones
                                       12

-------
 6.
             EVALUATION OF  GROUNDWATER EXTRACTION REMEDIES
                      EPA CONTRACT NO.   68-W8-009B
                            GENERAL  SITE DATA

                            DATA BASE  REPORT
Site name and location/EPA Region
 BERKS SAND PIT, PA     III

Program
 Superfund

Contact person
 PAT MCMANUS/EPA REGION III

Objective of Groundwater Extraction

 Interim objective(s)... Unknown
 Final objective(s)... Aquifer restoration

Type of Extraction System and System Enhancements;
 Drilled Wells, no system enhancements

Type of Site
 Other, OPEN PIT
 7.   What type of contaminants are involved?
      Organics

 8.   Are nonaqueous liquids present?
      No

 9.   What are the aquifer materials?

      Fractured Rock

10.   Describe special features of interest.
11.   What stage in the study/design/implementation process  is  this  site?
     Is extraction in progress?
      Remedial design workplan is in review.

12.   Dates of ROD or other milestones
                                        13

-------
              EVALUATION OF GROUNDWATER EXTRACTION REMEDIES
                      EPA CONTRACT NO.  68-W8-009B
                            GENERAL SITE DATA

                             DATA BASE REPORT
 1.  Site name and location/EPA Region
      BF GOODRICH, KY     IV

 2.  Program
      Superfund

 3.  Contact person
      DAVID KLUESNER, JEFF STARN/EPA REGION IV

 4.  Objective of Groundwater Extraction

      Interim objective(s)...  Unknown
      Final objective(s)...  Aquifer restoration

 5.  Type of Extraction System and System Enhancements
      Drilled Wells,  no system enhancements

 6.  Type of Site
      Manufacturing/processing plant

 7.  What type of contaminants are involved?
      Low sorption, Organics

 8.  Are nonaqueous liquids present?
      Yes, More dense than water.

 9.  What are the aquifer materials?

      Clay  Silt  Sand  Gravel  Interbedded Sediments

10.  Describe special features of interest.
Other...RIVER ALLUVIUM
11.  What stage in the study/design/implementation process is this site?
     Is extraction in progress?
      Design Stage
12.   Dates of ROD or other milestones
                                       14

-------
10,
              EVALUATION OF  GROUNDWATER EXTRACTION REMEDIES
                      EPA CONTRACT NO.   68-W8-009B
                            GENERAL SITE DATA

                             DATA BASE  REPORT
Site name and location/EPA Region
 BFI/CECOS,  LA     VI

Program
 RCRA

Contact person
 STEVE SLATEN/EPA REGION VI

Objective of Groundwater Extraction

 Interim objective(s)... Nonaqueous liquid recovery
 Final objective(s)... Plume containment

Type of Extraction System and System Enhancements:
 Drilled Wells, Pulsed Pumping

Type of Site
 Hazardous waste dump

What type of contaminants are involved?
 High and Low sorption, Organics and Metals

Are nonaqueous liquids present?
 Yes, Some more dense than water and some less dense than water.

What are the aquifer materials?

 Clay  Silt  Sand

Describe special features of interest.
 Downward gradient carrying contamination towards regional drinking
 water supply
11.   What stage in the study/design/implementation process is this site?
     Is extraction in progress?
      o  Some recovery of concentrated areas.
      o  System not complete.

12.   Dates of ROD or other milestones
                                       15

-------
              EVALUATION OF GROUNDWATER EXTRACTION REMEDIES
                      EPA CONTRACT NO.  68-W8-009B
                            GENERAL SITE DATA

                             DATA BASE REPORT
 1.   Site name and location/EPA Region
      BLACK AND DECKER,  NY     II

 2.   Program
      RCRA

 3.   Contact person
      PAUL HARE/DUNN GEOSCIENCE, ALBANY, NY

 4.   Objective of Groundwater Extraction                                ;

      Interim objective(s)... Unknown
      Final objective(s)...  Aquifer restoration

 5.   Type of Extraction System and System Enhancements;
      Drilled Wells, no system enhancements

 6.   Type of Site
      Manufacturing/processing plant

 7.   What type of contaminants are involved?
      Organics

 8.   Are nonagueous liquids  present?
      No

 9.   What are the aquifer materials?

      Fractured Rock    Other...SANDSTONE

10.   Describe special features of interest.           .                   .
      Two hydraulically interconnected aquifers.  Corrective action involves
      groundwater recovery from a single well located in an artificially
      produced fracture zone.

11.   What stage in the study/design/implementation process is this site?
     Is extraction in progress?
      Long term remediation initiated in May 1988.  Continuous remediation
      initiated in October 1988.  Maybe too soon to evaluate treatement
      system.
12.
Dates of ROD or other milestones
                                        16

-------
               EVALUATION OF GROUNDWATER EXTRACTION REMEDIES
                      EPA CONTRACT NO.   68-W8-009B
                            GENERAL  SITE DATA

                             DATA BASE  REPORT
 !•  Site name and location/EPA Region.
      BLOSENSKI LANDFILL, PAIII'  '

 2.  Program
      Superfund

 3.  Contact person
      JEFF WINEGAR/EPA REGION III      -•.-..•.

 4.  Objective of Groundwater Extraction            -

      Interim objective(s)... Plume containment, WELLHEAD  TREAT.
      Final objective(3)... Aquifer restoration

 5'  Type of Extraction  System and .System Enhancements;'
      Drilled Wells, no  system enhancements

 6.  Type of Site
      Hazardous waste dump                                   '

 7i  What type of contaminants are involved?
      Organics

 8.  Are nonaqueous liquids present?
      Yes, More dense than water.

 9-  What are the aquifer materials?        :  :   ."     ; , ,

      Fractured Rock

!0•  Describe special features of interest.  ,    :
      Over 60 lineament traces have been identified iri project area.

11•  What stage in the study/design/implementation process is this site?
     Is extraction in progress?
      Study (predesign)  stage . ' '  .     "•..-.,	,

12.  pates of ROD or -other milestones
                                       17

-------
             EVALUATION OF GROUNDWATER EXTRACTION REMEDIES
                     EPA CONTRACT NO.  68-W8-009B
                           GENERAL SITE DATA

                            DATA BASE REPORT
1.  Site name and location/EPA Region
     BOEING OF PORTLAND, OR     X

2.  Program
     RCRA

3.  Contact person
     WAYNE PIERRE, RENE  FUENTES/EPA REGION  X

4.  Objective of Groundwater  Extraction

     Interim objective(s)...  Plume  containment
     Final objective(s)... Aquifer  restoration

5.  Type of Extraction  System and System Enhancements:
     Drilled Wells, no  system enhancements

6.  Type of Site
     Manufacturing/processing plant
 7.   What type of contaminants are involved';
      Organics
 8.   Are nonaqueous liquids present?
      No

 9.   What are the aquifer materials?

      Silt  Sand

10.   Describe special features of interest.
      Potential multi-aquifer contamination

11.   what stage in the study/design/implementation process is this site?
     Is extraction in progress?
      Plan to begin extraction in 1989.

12.   Dates of ROD or other milestones
                                       18

-------
              EVALUATION OF GROUNDWATER EXTRACTION REMEDIES
                      EPA CONTRACT NO.  68-W8-009B
                            GENERAL SITE DATA

                             DATA BASE REPORT
 1.  Site name and location/EPA Region
      BTL SPECIALTY RESINS CORP, NY     II

 2.  Program
      RCRA

 3.  Contact person
      YAVUC ERK/NY STATE DEC

 4.  Objective of Groundwater Extraction

      Interim objective(s)...  Plume containment
      Final objective(s)...  Aquifer restoration

 5.  Type of Extraction System and System Enhancements:
      Drilled Wells,  no system enhancements

 6.  Type of Site
      Manufacturing/processing plant

 7.  What type of contaminants are involved?
      Organics

 8.  Are nonaqueous liquids  present?
      No

 9.  What are the aquifer materials?

      Sand  Gravel  Fractured Rock

10.  Describe special features of interest.
      No on-site treatment
      Discharge to wastestream (sewer)  to off-site treatment
      Pumping rate designed  not to exceed "allotment" to off-site sewer

11.  What stage in the study/design/implementation process is this site?
     Is extraction in progress?
      Extraction on-going since late February 1989.

12.  Dates of ROD or other milestones
                                       19

-------
10.
         EVALUATION OF GROUNDWATER EXTRACTION REMEDIES
                 EPA CONTRACT NO,.  68-W8-Q09B
                     ;  GENERAL SITE DATA

                        DATA BASE REPORT
Site name and location/EPA Region
 BURLINGTON NORTHERN RR, MN '    V '          "        ,  '

Program
 State Lead

Contact person
 KEN HABERMAN/MPCA

Objective of Groundwater Extraction         ,

 Interim objective (s) ... Unknown ,
 Final objective (s).. . . Plume containment    -.    .

Type of Extraction System and System. Enhancements :
 Drilled Wells,  no system .enhancements            !  '  '

Type of Site
 Manufacturing/processing plant                   .",  '

What type of contaminants are involved?
 High sorption,  Organics                   .

Are nonaqueous liquids present?
 Yes, More dense than water.                   .

What are the aquifer materials?

 Sand  Gravel    Other. . .GLACIAL TILL .

Describe special features of interest.
 Perched water below a treatment lagoon

What stage in the study/design/implementation process is this site?
Is extraction in progress?
 Pumping is in progress * .....          .    . "".'
Dates of ROD or other milestones
                                   20

-------
             EVALUATION OF GROUNDWATER EXTRACTION REMEDIES
                     EPA CONTRACT NO.  68-W8-009B
                           GENERAL  SITE  DATA

                             DATA BASE  REPORT
 1.   Site  name  and location/EPA Region
     CAPE FEAR WOOD  PRESERVING,  NC     IV

 2.   Program
     Superfund

 3.   Contact person
     RICH MUZA,  JON  BORNHOLM/EPA REGION IV

 4.   Objective  of Groundwater Extraction

     Interim objective(s)... Unknown
     Final objective(s)..;  Aquifer restoration

 5.   Type  of Extraction System and System Enhancements:
     Well Points, no system enhancements

 6.   Type  of Site
     Manufacturing/processing plant

 7.   What  type  of contaminants are involved?
     High sorption,  Organics and Metals

 8.   Are nonaqueous liquids  present?
     No

 9.   What  are the aquifer materials?           •

     Clay  Silt  Sand  Interbedded Sediments

10.   Describe special features of interest.
     Well point system planned to remediate 10,000 square  feet  subareas  of
      the surfiial aquifers  at a time

11.   What stage in the study/design/implementation process  is  this  site?
     Is extraction in progress?
      Pre-design stage
12.   Dates of ROD or other milestones
                                        21

-------
                             EVALUATION OF GROUNDWATER EXTRACTION REMEDIES
                                     EPA CONTRACT NO.  68-W8-009B
                                           GENERAL- SITE DATA

                                            DATA BASE REPORT
                1.  Site name and location/EPA Region
                     CAVENHAM CORPORATION, MS     IV

                2.  Program
                     RCRA

                3.  Contact person
                     BEVERLY FOSTER/EPA REGION IV, RCRA BRANCH

                4.  Objective of Groundwater Extraction

                     Interim objective(s)... Nonaqueous liquid  recovery
                     Final objective(s)... Aquifer restoration

                5.  Type of Extraction System and System Enhancements;
                     Drilled Wells, no system enhancements

                6.  Type of Site
                     Manufacturing/processing plant

                7.  What type of contaminants are involved?
                     Organics

                8.  Are nonaqueous  liquids present?
                     Yes, More  dense  than water.

                9.  What are the aquifer  materials?

                     Sand

                10.  Describe special  features of interest.
                     Well installation stage
                11.  What  stage  in the study/design/implementation  process  is this site?
                    Is  extraction in progress?
                      Well installation stage

                12.  Dates of ROD  or other milestones
                                                        22
_

-------
              EVALUATION OF GROUNDWATER EXTRACTION REMEDIES
                      EPA CONTRACT NO.  68-W8-009B
                            GENERAL SITE DATA

                             DATA BASE REPORT
 1.  Site name and location/EPA Region
      CAVENHAM CORPORATION, AL     IV

 2.  Program
      RCRA

 3.  Contact person
      BEVERLY FOSTER/EPA REGION IV, RCRA BRANCH

 4.  Objective of Groundwater Extraction

      Interim objective(s)... Nonaqueous liquid recovery
      Final objective(s)... Aquifer restoration

 5.  Type of Extraction System andSystem Enhancements;
      Drilled Wells,  no system enhancements

 6.  Type of Site
      Manufacturing/processing plant

 7.  What type^ of contaminants are involved?
      Organics

 8.  Are nonaqueous liquids present?
      Yes,  More dense than water.

 9.  What are the aquifer materials?

      Sand
10.   Describe special features of interest.
      Design/permitting stage
12,
11.   What stage in the study/design/implementation process is this site?
     Is extraction in progress?
      Well installation stage
     Dates of ROD or other milestones
                                       23

-------
             EVALUATION OF GROUNDWATER EXTRACTION REMEDIES
                     EPA CONTRACT NO.  68-W8-009B
                           GENERAL  SITE DATA

                            DATA BASE REPORT
1.   Site name  and  location/EPA Region
     CHEMTRONICS SITE, NC      IV

2.   Program
     Superfund

3.   Contact person
     RICH MUZA, JON BORNHOLM/EPA REGION IV

4.   Objective  of Groundwater Extraction

     Interim objective(s)... Plume containment
     Final  objective(s)... Aquifer restoration

5.   Type of Extraction System and System Enhancements:
 6.
 8.
 9.
10.
 Drilled Wells, no system enhancements

Type of Site
 Manufacturing/processing plant
 7.   What type of contaminants are involved?
 Low sorption, Organics

Are nonaqueous liquids present?
 No

What are the aquifer materials?

 Fractured Rock    Other...SAPROLITE
Describe special features of interest,
 Multi-aquifer contamination
11.  What stage in the study/design/implementation process is this site?
     Is extraction in progress?
      Design stage

12.  Dates of ROD or other milestones
                                        24

-------
              EVALUATION OF GROUNDWATER EXTRACTION REMEDIES
                      EPA CONTRACT NO.  68-W8-009B
                            GENERAL SITE DATA

                             DATA BASE REPORT
 1-  Site name and location/EPA Region
      CIBA - GEIGY, ALIV

 2.  Program
      Superfund, AND RCRA

 3.  Contact person
      BEVERLY FOSTER/EPA REGION IV, RCRA BRANCH

 4.  Objective of Groundwater Extraction             ,

      Interim objective(s)... Unknown
      Final objective(s)...  Aquifer restoration

 5-  Type of Extraction System and System Enhancements:
      Drilled Wells,  no system enhancements

 6.  Type of Site
      Manufacturing/processing plant

 7.  What type of contaminants are involved?
      Organics

 8.  Are nonagueous liquids  present?
      No

 9.  What are the aquifer materials?	

      Silt  Sand

10.  Describe special features of interest.  -    •  .
11-  What stage in the study/design/implementation process is this site?
     Is extraction in progress?                      ,
      There has been pumping at the site for about 2 years.  ':

12.  Dates of ROD or other milestones
                                       25

-------
             EVALUATION OF GROUNDWATER EXTRACTION REMEDIES
                     EPA CONTRACT NO.  68-W8-009B
                           GENERAL  SITE DATA

                            DATA BASE REPORT
 1.  Site name  and location/EPA Region
     COLEMAN-EVANS WOOD  PRESRV,  FL      IV

 2.  Program
     Superfund

 3.  Contact person
     CAMILLA WARREN,  BEVERLY HOUSTON/EPA REGION IV

 4.  Objective  of Groundwater Extraction

     Interim objective(s)... Unknown
     Final objective(s)...  Aquifer  restoration

 5.  Type o£ Extraction System and System Enhancements;
 6.
 Drilled Wells, no system enhancements

Type of Site
 Manufacturing/processing plant
 7.   What type of contaminants are involved?
      Organics and Metals

 8.   Are nonaqueous liquids present?
      No

 9.   What are the aquifer materials?

      Sand

10.   Describe special features of interest.
11.  What stage in the study/design/implementation process is this  site?
     Is extraction in progress?
      Remedial Design is greater than 90% complete.

12.  Dates of ROD or other milestones
                                        26

-------
              EVALUATION OF GROUNDWATER EXTRACTION REMEDIES
                      EPA CONTRACT NO.  68-W8-009B
                            GENERAL SITE DATA

                             DATA BASE REPORT
 1.  Site name and location/EPA Region
      CONOCO REFINING, OK     VI

 2.  Program
      RCRA

 3.  Contact person
      STEVE SLATEN/EPA REGION VI

 4.  Objective of Groundwater Extraction

      Interim objective(s)... Plume containment, Non-aqueous Rec
      Final objective(s)...  Aquifer restoration

 5.  Type of Extraction System and System Enhancements;
      Drilled Wells,  Reinjection

 6.  Type of Site
      Manufacturing/processing plant

 7.  What type of contaminants are involved?
      Organics and Metals

 8.  Are nonaqueous liquids  present?
      Yes,  Less dense than water.

 9.  What are the aquifer materials?

      Clay  Silt  Sand

10.  Describe special features of  interest.
      o  Offsite contamination in  residential basements
      o  Enhanced bioremediation to clean low levels
      o  Injection producing barrier mounds

11-  What stage in the study/design/implementation process is this site?
     Is extraction in progress?
      Implementation underway

12.  Dates of ROD or other milestones
                                       27

-------
             EVALUATION OF GROUNDWATER EXTRACTION REMEDIES
                     EPA CONTRACT  NO.   68-W8-009B
                           GENERAL SITE DATA

                            DATA BASE  REPORT
 1.   Site name and  location/EPA Region
      COOPER BIOMEDICAL,  INC.,  NJ     II

 2.   Program
      State  Lead, ECRA

 3.   Contact person
      KEN SMITH/NJ  DEP

 4.   Objective of Groundwater Extraction

      Interim objective(s)...  Unknown
      Final  objective(s)... Aquifer restoration

 5.   Type of Extraction  System and System Enhancements:
      Well Points,  no  system  enhancements

 6.   Type of Site
      Manufacturing/processing plant

 7.   What type of contaminants are involved?
      Low sorption,  Organics

 8.   Are nonaqueous liquids present?
      No

 9.   What are the aquifer materials?

      Clay   Sand Gravel

10.   Describe special  features of interest.
      Multiple well points attached to a vacuum system (21 well points).

11.   What stage  in  the study/design/implementation process is this site?
     Is extraction  in  progress?
      Extraction started in March, 1988.

12.   Dates of ROD or other milestones
                                       28

-------
              EVALUATION OF GROUNDWATER EXTRACTION REMEDIES
                      EPA CONTRACT NO.   68-W8-009B
                            GENERAL SITE DATA

                             DATA BASE  REPORT
 1.   Site name and location/EPA Region
      DES MOINES TCE,  IA     VII

 2.   Program
      Superfund

 3.   Contact person
      L.D. MACMILLAN/DES MOINES WATER WORKS

 4.   Objective of Groundwater Extraction

      Interim objective(s)... Unknown
      Final objective(s)...  Aquifer restoration

 5.   Type of Extraction System and System Enhancements:
      Drilled Wells,  no system enhancements

 6.   Type of Site
      Manufacturing/processing plant

 7.   What type of contaminants are involved?
      Organics

 8.   Are nonaqueous liquids present?
      No

 9.   What are the aquifer materials?

      Sand  Gravel

10.   Describe special features of interest.
      Near infiltration galleries supplying water to Des Moines

11.   What stage in the study/design/implementation process is this  site?
     Is extraction in progress?
      Full extraction system operation started December 17,  1987.

12.   Dates of ROD or other milestones
                                        29

-------
              EVALUATION OF GROUNDWATER EXTRACTION REMEDIES
                      EPA CONTRACT NO.   68-W8-009B
                            GENERAL SITE DATA

                             DATA BASE  REPORT
 1.   Site name and location/EPA Region
      DISTLER BRICKYARD,  KY     IV

 2.   P rogram
      Superfund

 3.   Contact person
      FELICIA BARNETT,  JEFF STARN/EPA REGION IV

 4.   Objective of Groundwater Extraction

      Interim objective(s)... Unknown
      Final objective(s)... Aquifer restoration

 5.   Type o£ Extraction System and System Enhancements;
      Drilled Wells,  Reinjection

 6.   Type o£ Site
      Hazardous waste dump

 7.   What type of contaminants are involved?
      Low sorption, Organics and Metals

 8.   Are nonaqueous liquids present?
      Yes, More dense than water.

 9.   What are the aquifer materials?

      Silt  Sand  Gravel    Other...RIVER ALLUVIUM

10.   Describe special features of interest.
      Two interconnected aquifers controlled by bedrock structure (erosional
      surface).

11.   What stage in the study/design/implementation process is this site?
     Is extraction in progress?
      Implementation in progress

12.   Dates of ROD or other milestones
                                        30

-------
              EVALUATION OF GROUNDWATER EXTRACTION REMEDIES
                      EPA CONTRACT NO.  68-W8-009B
                            GENERAL SITE DATA

                             DATA BASE REPORT
 1.   Site name and location/EPA Region
      DISTLER FARM,  KY     IV                                       '

 2.   Program
      Superfund

 3,   Contact person
      FELICIA BARNETT,  JEFF STARN/EPA REGION IV

 4.   Objective of Groundwater Extraction

      Interim objective(s)...  Unknown
      Final objective(s)... Aquifer restoration

 5.   Type of Extraction System and System Enhancements:
      Drilled Wells,  no system enhancements

 6.   Type of Site
      Hazardous waste dump

 7.   What type of contaminants are involved?
      Low sorption,  Organics

 8.   Are nonaqueous liquids present?
      Yes,  More dense than water.

 9.   What are the aquifer materials?

      Clay  Silt  Sand

10.   Describe special features of interest.
      Very large diameter wells actually function more like a trench but
      were cheaper to construct.  Low permeability aquifer.

11.   What stage in the study/design/implementation process is this site?
     Is extraction in progress?
      Implementation underway

12.   Dates of ROD or other milestones
                                       31

-------
                            EVALUATION OF GROUNDWATER EXTRACTION REMEDIES
                                    EPA CONTRACT NO.  68-W8-009B
                                          GENERAL SITE DATA

                                           DATA BASE REPORT
               1.  Site name and location/EPA Region
                    DRAKE CHEMICAL, PA     III

               2.  Program
                    Superfund

               3.  Contact person
                    ROY SCHROCK/EPA REGION III

               4.  Objective of Groundwater Extraction

                    Interim objective(s)... Unknown
                    Final objective(s)... Aquifer restoration

               5.  Type of Extraction System and System Enhancements:
                    Drilled Wells, no system enhancements

               6.  Type of Site
                    Manufacturing/processing plant

               7.  What type of contaminants are involved?
                    Organics and Metals

               8.  Are nonaqueous liquids present?
                    No

               9.  What are the aquifer materials?
              10.  Describe special features of interest.
                    Biological activated carbon treatment

              11.  What stage in the study/design/implementation process is this site?
                   Is extraction in progress?
                    Just beginning groundwater remedial design

              12.  Dates of ROD or other milestones
                                                     32
_

-------
             EVALUATION OF GROUNDWATER EXTRACTION REMEDIES
                     EPA CONTRACT NO.  68-W8-009B
                           GENERAL SITE DATA

                            DATA BASE REPORT
1.  Site name and location/EPA Region
     DUPONT - AXIS, AL     IV

2.  Program
     RCRA

3.  Contact person
     BEVERLY FOSTER/EPA REGION IV, RCRA BRANCH

4.  Objective of Groundwater Extraction

     Interim objective(s)... Unknown
     Final objective(s)... Plume  containment

5.  Type of Extraction System and System Enhancements:
     Drilled Wells, no system enhancements

6.  Type of Site
     Manufacturing/processing plant

7.  What type of contaminants are involved?
     Organics

8.  Are nonaqueous  liquids present?
     No

 9.  What are  the aquifer materials?

     Clay   Sand

10.  Describe  special features  of interest.
      Heavy pumping bordering propeerty may capture part of plume.   Source
      soils have not been removed

11.   What  stage  in  the study/design/implementation process is this site?
     Is extraction  in progress?
      First 2  extraction wells began in December 1985.  A third well was
      added in 1986.

12.   Dates of ROD or other milestones
                                        33

-------
              EVALUATION OF GROUNDWATER EXTRACTION REMEDIES
                      EPA CONTRACT NO.  68-W8-009B
                            GENERAL SITE DATA

                             DATA BASE REPORT
 1.  Site name and location/EPA Region
      ELECTRONIC CONTROLS CORP., MA     I

 2.  Program
      RCRA

 3.  Contact person
      JEFF CHORMANN/MASSACHUSETTS DEQE, BOSTON

 4.  Objective of Groundwater Extraction

      Interim objective(s)... Plume containment
      Final objective(s)... Aquifer restoration

 5.  Type of Extraction System and System Enhancements:
      Drilled Wells, no system enhancements

 6.  Type of Site
      Manufacturing/processing plant

 7.  What type of contaminants are involved?
      Organics

 8.  Are nonaqueous liquids present?
      No

 9.  What are the aquifer materials?

      Sand  Gravel

10.  Describe special features of interest.
      o  Losing stream adjacent to site
      o  Public Municipal well less than 500 feet downgradient with trace
      levels of organics
      o  Facility has its own pumping wells onsite for cooling water

11.  What stage in the study/design/implementation process is this site,?
     Is extraction in progress?
      Study stage — late stages of investigative — source/plume
      assessment.  Design phase expected this summer (pump testing of
      aquifer).

12.  Dates of ROD or other milestones
                                        34

-------
             EVALUATION OF GROUNDWATER EXTRACTION REMEDIES
                     EPA CONTRACT NO.  68-W8-009B
                           GENERAL SITE DATA

                            DATA BASE REPORT
1.  Site name and location/EPA Region
     ELECTRONIC INDUSTRIES, MN     V

2.  Program
     State Lead

3.  Contact person
     JERRY STONKE/MPCA

4.  Objective of Groundwater Extraction

     •Interim objective(s)... Plume containment
     Final objective(s)... Aquifer restoration

5.  Type of Extraction  System and System Enhancements;
 6.
 Drilled Wells, no system enhancements

Type of Site
 Manufacturing/processing plant
 7.   What  type  of  contaminants  are involved?
      Organics

 8.   Are nonaqueous  liquids present?
      No

 9.   What  are the  aquifer materials?

      Clay .Silt  Sand

10.   Describe special features  of interest.
11.  What stage in the study/design/implementation process is this site?
     Is extraction in progress?
      One well pumping at 2 to 3 gpm since 1985.

12.  Dates of ROD or other milestones
                                        35

-------
             EVALUATION OF GROUNDWATER EXTRACTION REMEDIES
                     EPA CONTRACT NO.  68-W8-009B
                           GENERAL SITE DATA

                            DATA BASE REPORT
 1.  Site name and location/EPA Region
     EMERSON ELECTRIC, FL     IV

 2.  Program
     State Lead

 3.  Contact person
     JAMES BRECK DALTON/FL DER

 4.  Objective of Groundwater Extraction

     Interim objective(s)... Unknown
     Final objective(s)... Aquifer restoration

 5.  Type of Extraction System and System Enhancements;
 6.
 Drilled Wells,  no system enhancements

Type of Site
 Manufacturing/processing plant
 7.   What  type  of  contaminants  are involved?
      Organics

 8.   Are nonaqueous  liquids  present?
      No
 9.   What are the  aquifer materials?

      Clay  Sand  Limestone

10.   Describe special features of interest.
11.  What stage in the study/design/implementation process is this site?
     Is extraction in progress?
      Remediation started in December 1984.

12.  Dates of ROD or other milestones
                                       36

-------
10.
              EVALUATION OF GROUNDWATER EXTRACTION REMEDIES
                      EPA CONTRACT NO.  68-W8-009B
                            GENERAL SITE DATA

                             DATA BASE REPORT
     Site name and location/EPA Region
      ENSCO,  AR     VI

     Program
      RCRA

     Contact person
      STEVE SLATEN/EPA REGION VI

     Objective of Groundwater Extraction

      Interim objective(s)... Plume containment
      Final objective(s)...  Aquifer restoration
Type of Extraction System and System Enhancements;
 Drilled Wells, no system enhancements
 AND TRENCHES

Type of Site
 Other, AMOCO REFINERY

What type of contaminants are involved?
 Organics and Metals

Are nonaqueous liquids present?
 Yes, Less dense than water.

What are the aquifer materials?

 Clay  Sand

Describe special features of interest.
 Site is on top of a major fault leading to regional drinking water.
11.  What stage in the study/design/implementation process is this  site?
     Is extraction in progress?
      Some extraction of high chlorides — french drains catching some
      floaters.  RCRA RFI in progress.

12.  Dates of ROD or other milestones
                                       37

-------
              EVALUATION OF GROUNDWATER EXTRACTION REMEDIES
                      EPA CONTRACT NO.   68-W8-009B
                            GENERAL SITE DATA

                             DATA BASE  REPORT
 1.   Site name and location/EPA Region
      EVANITE BATTERY SEPARATOR,  OR     X

 2.   Program
      RCRA,  AND STATE LEAD

 3.   Contact person
      CHRISTY AHLSTROM/EPA REGION X

 4.   Objective of Groundwater Extraction

      Interim objective(s)... Plume containment, NAPL RECOVERY
      Final objective(s)... Aquifer restoration

 5.   Type of Extraction System and System Enhancements:
 6.
 Drilled Wells, no system enhancements

Type of Site
 Manufacturing/processing plant
 7.   What type of contaminants are involved?
      Low sorption, Organics

 8.   Are nonaqueous liquids present?
      Yes, More dense than water.

 9.   What are the aquifer materials?

      Silt  Sand  Gravel

10.   Describe special features of interest.
11.  What stage in the study/design/implementation process is this site?
     Is extraction in progress?
      Extraction wells have been installed; full-scale implementation to
      begin upon permit issuance.

12.  Dates of ROD or other milestones
                                       38

-------
             EVALUATION  OF  GROUNDWATER EXTRACTION REMEDIES
                      EPA CONTRACT NO.   68-W8-009B
                            GENERAL  SITE DATA

                             DATA BASE  REPORT
 1.   Site name and location/EPA Region
      FAIRCHILD  SEMICONDUCTOR,  CA     IX

 2.   Program
      State  Lead
 3.   Contact person
      WILFRED  BRUHNS/REG WATER CONTR BOARD,  OAKLAND CA

 4.   Objective of  Groundwater Extraction

      Interim  objective(s)... Unknown
      Final objective(s)...  Plume containment

 5.   Type  of Extraction System and System Enhancements:
      Drilled  Wells,  no system enhancements

 6.   Type  of Site
      Manufacturing/processing plant

 7.   What  type of  contaminants are involved?
      Organics

 8.   Are nonaqueous  liquids  present?
      Yes, More dense than water.

 9.   What  are  the  aquifer materials?

      Clay Silt  Sand  Gravel

10.   Describe  special features of interest.
      The  A aquifer  is generally dry and is  connected to the B aquifer
      beneath  the  site.  The B-C aquitard is about 50 feet thick.   The B and
      C aquifers are areally extensive and ase used for drinking water.
      Only one drinking water production well is located within the area
      affected by the site.   The D aquifer is not areally extensive and is
      not  a major source of water.

11.   What  stage in the study/design/implementation process is this site?
     Is extraction in progress?
      Implementation stage;  extraction has been ongoing since 1982.
      Extraction from C aquifer was terminated on September 6, 1988.
      Interim remedial measures have been implemented.
12.   Dates of ROD or other milestones
                                       39

-------
                              EVALUATION OF GROUNDWATER EXTRACTION REMEDIES
                                      EPA CONTRACT NO.   68-W8-009B
                                            GENERAL SITE DATA

                                             DATA BASE  REPORT
               10.
Site name and location/EPA Region
 FERNWOOD WOOD TREATING CO, MS     IV

Program
 RCRA

Contact person
 JASON DARBY/EPA REGION IV

Objective of Groundwater Extraction

 Interim objective(s)... Nonaqueous liquid recovery
 Final objective(s)... Aquifer restoration

Type of Extraction  System and System Enhancements;
 Drilled Wells, no  system enhancements

Type of Site
 Manufacturing/processing plant

What type of contaminants are involved?
 Organics

Are nonaqueous liquids present?
 Yes, More dense than water.

What are the aquifer materials?

 Sand

Describe special features of interest.
                11.  What stage  in the  study/design/implementation process  is  this  site?
                    I3 extraction in progress?
                     Finalizing correction  action plan

                12.  Dates of ROD or other milestones
                                                       40
_

-------
             EVALUATION OF GROUNDWATER  EXTRACTION  REMEDIES
                     EPA CONTRACT NO.   68-W8-009B
                           GENERAL  SITE DATA

                            DATA BASE REPORT
 1.   Site name and location/EPA Region
     FMC CORPORATION, NY      II

 2.   Program
     Superfund, AND RCRA

 3.   Contact person
     YAVUS  ERK, MATTHEW MORTFOLIO/NY STATE DEC

 4.   Objective of Groundwater  Extraction

     Interim objective(s)...  Plume containment
     Final  objective(s)...  Aquifer restoration

 5.   Type of Extraction System and System Enhancements:
     Drilled Wells, no system enhancements
 6.   Type of Site
      Manufacturing/processing plant

 7.   What type of contaminants are involved?
      Organics and Metals

 8.   Are nonaqueous liquids present?
      Yes,  Unknown

 9.   What are the aquifer materials?

      Sand  Gravel  Fractured Rock  Limestone

10.   Describe special features of interest.
      4 pumping wells — 80 feet into Lockport limestone — since February
      1988 all wells were pumped at 4 gpm to off-site treatment (Seacoast
      International).  Later onsite treatment — ion exchange, carbon
      filters at 40 gpm

11.   What stage in the study/design/implementation process is this site?
     Is extraction in progress?
      Extraction on-going since February 1988

12.   Dates of ROD or other milestones
                                       41

-------
10.
              EVALUATION OF GROUNDWATER EXTRACTION REMEDIES
                      EPA CONTRACT NO.   68-W8-009B
                            GENERAL SITE DATA

                             DATA BASE  REPORT
Site name and location/EPA Region
 FMC CORPORATION, MN     V

Program
 State Lead

Contact person
 DALE THOMPSON/MPCA

Objective of Groundwater Extraction

 Interim objective(s)... Plume containment
 Final objective(s)... Aquifer restoration

Type of Extraction System and System Enhancements:
 Drilled Wells, no system enhancements

Type of Site
 Manufacturing/processing plant

What type of contaminants are involved?
 Organics

Are nonaqueous liquids present?
 Yes, Less dense than water.

What are the aquifer materials?

 Sand

Describe special features of interest.
 Surface aquifer and St. Peter sandstone are contaminated
11.  What stage in the study/design/implementation process is this  site?
     Is extraction in progress?
      Pumping started in 1987

12.  Dates of ROD or other milestones
                                       42

-------
2.
3.
 5-
 6.
 7«
 8 .
10.
11 •
               EVALUATION OF GROUNDWATER EXTRACTION REMEDIES
                       EPA CONTRACT NO.   68-W8-009B
                             GENERAL SITE DATA

                              DATA BASE  REPORT



      Site name and  location/EPA Region
      FORD MOTOR CO, NJII

      Program
      State Lead, ECRA

      Contact person
      KEN SMITH/NJ  DEP


      Objective of Groundwater Extraction

      Interim  objective(s)... Unknown
      Final objective(s)... Aquifer restoration
    Type of Extraction System and System Enhancements \
     Drilled Wells,  no system enhancements
    Type of Site
     Manufacturing/processing plant

    What type  of contaminants are  involved?
     Organics  and Metals

    Are  nonaqueous liquids  present?
     No

    What are the aquifer materials?

     Sand

    Describe special  features of interest.
     Little  data is in the  file about the design,  operation or
     effectiveness of the system


         stage in the study/design/implementation  process  is this  site'
     Is extraction in progress?
      Extraction began in October,  1986
      winter months.

i2.  Dates of ROD or  other milestones
                                        There is no extraction  in the
                                     43

-------
             EVALUATION OF GROUNDWATER EXTRACTION REMEDIES
                     EPA CONTRACT NO.  68-W8-009B
                           GENERAL SITE DATA

                            DATA BASE REPORT
1.  Site name and location/EPA Region
     FRONTIER HARD CHROME, WA     X

2.  Program
     Superfund

3.  Contact person
     KEVIN ROCHLIN, RENE FUENTES/EPA REGION X

4.  Objective of Groundwater Extraction

     Interim objective(s)... Plume containment
     Final objective(s)... Aquifer restoration

5.  Type of Extraction  System and System Enhancements:
     Drilled Wells, no  system enhancements

6.  Type of Site
     Manufacturing/processing plant

7.  What type of contaminants are involved?
     Organics and Metals

8.  Are nonaqueous  liquids present?
     No

9.  What are the aquifer  materials?

     Clay  Silt  Sand

10.  Describe special features of interest.
     Two shallow aquifers separated by clay aquitard with at least a few
     windows interconnecting them.

11.  What stage  in  the study/design/implementation process is this site?
     la extraction  in progress?
      Starting design stage

12.   Dates  of ROD  or other milestones
                                        44

-------
              EVALUATION OF GROUNDWATER EXTRACTION REMEDIES
                      EPA CONTRACT NO.  68-W8-009B
                            GENERAL SITE DATA

                             DATA BASE REPORT
 1.   Site name and location/EPA Region
      FRUEHAUF CORPORATION, AL     IV

 2.   Program
      RCRA

 3.   Contact person
      BEVERLY FOSTER/EPA REGION IV, RCRA BRANCH

 4.   Objective of Groundwater Extraction

      Interim objective(s)... Unknown
      Final objective(s)... Aquifer restoration

 5.   Type of Extraction System and System Enhancements;
      Drilled Wells, no system enhancements

 6.   Type of Site
      Manufacturing/processing plant

 7.   What type of contaminants are involved?
      Metals

 8.   Are nonaqueous liquids present?
      No

 9.   What are the aquifer materials?

      Silt

10.   Describe special features of interest.
11.  What stage in the study/design/implementation process is this site?
     Is extraction in progress?
      Well installation stage

12.  Dates of ROD or other milestones
                                        45

-------
                  6.
                              EVALUATION OF GROUNDWATER EXTRACTION REMEDIES
                                      EPA CONTRACT NO.  68-W8-009B
                                            GENERAL SITE DATA

                                             DATA BASE REPORT
Site name and location/EPA Region
 GEIGER/C&M OIL, SC     IV

Program
 Superfund

Contact person
 AL CHERRY, JEFF STARN/EPA REGION IV

Objective of Groundwater Extraction

 Interim objective(s)... Unknown
 Final objective(s)... Aquifer restoration

Type of Extraction System and System Enhancements;
 Drilled Wells, no system enhancements

Type of Site
 Manufacturing/processing plant
                 7.  What type of contaminants are  involved?
                       Low sorption, Organics

                 8.  Are nonaqueous liquids present?
                       No

                 9.  What are the aquifer materials?

                       Silt   Sand

                 10.  Describe special  features of interest.


                 11.  What stage  in the study/design/implementation  process  is this site?
                     Is extraction in  progress?
                       Study stage — pump and treat being re-evaluated.

                 12.  Dates  of ROD or other milestones
                                                        46
_

-------
             EVALUATION  OF  GROUNDWATER  EXTRACTION REMEDIES
                      EPA CONTRACT NO.   68-W8-009B
                            GENERAL  SITE DATA

                             DATA BASE REPORT
 1.  Site name  and  location/EPA Region
     GENERAL ELECTRIC/EAST  ST,  MA     I

 2.  Program
     RCRA,  AND STATE  LEAD

 3.  Contact person
     KEVIN  SHEEHAN/MASSACHUSETTS  DEQE,  SPRINGFIELD

 4.  Objective  of Groundwater Extraction           '

     Interim objective(s)... Nonaqueous liquid recovery
     Final  objective(s)...  Plume  containment

 5.  Type of Extraction System and System Enhancements;
     Trenches, no  system enhancements
 6.   Type of Site
      Manufacturing/processing plant

 7.   What type of contaminants are involved?
      Organics

 8.   Are nonaqueous liquids present?
      Yes,  Less dense than water.

 9.   What are the aquifer materials?

      Sand  Gravel

10.   Describe special features of interest.
      2 years in operation, evaluation of ROD requirement

11.   What stage in the study/design/implementation process is this site?
     Is extraction in progress?
      2 years in operation, evaluation of ROD requirement

12.   Dates of ROD or other milestones
                                        47

-------
              EVALUATION OF GROUNDWATER EXTRACTION REMEDIES
                      EPA CONTRACT NO...  68-W8-009B
                            GENERAL SITE DATA

                             DATA BASE REPORT
 1.   Site  name and location/EPA Region
      GENERAL ELECTRIC/PINNELAS,  FL     IV

 2.   Program
      DOE

 3.   Contact person
      ERIC NUZIE/FL DER

 4.   Objective of Groundwater Extraction

      Interim objective(s)... Unknown
      Final objective(s)...  Plume containment

 5.   Type  of Extraction System and System Enhancements:
      Drilled Wells, no system enhancements

 6.   Type  of Site
      Manufacturing/processing plant

 7.   What  type of contaminants are involved?
 8,
 Organics

Are nonaqueous liquids present?
 No
 9.   What are the aquifer materials?

      Silt  Sand

10.   Describe special features of interest.
      Well installation and some pumping

11.   What stage in the study/design/implementation process is this site?
     Is extraction in progress?
      Well installation and some pumping

12.   Dates of ROD or other milestones
                                        48

-------
               EVALUATION OF  GROUNDWATER EXTRACTION REMEDIES
                       EPA CONTRACT  NO.   68-W8-009B
                             GENERAL SITE DATA


                              DATA BASE  REPORT
 1.  Site name  and  location/EPA  Region
      GENERAL MILLS, MNV~

 2.  Program
      State Lead

 3.  Contact person
      KATHY KRAMER/MPCA

 4.  Objective  of Groundwater Extraction

      Interim objective(s)... Plume containment
      Final objective(s)... Aquifer restoration
 5-  Type of Extraction System and System Enhancements:
      Drilled Wells, no system enhancements
 6.  Type of Site
      Manufacturing/processing plant

 7.  What type of contaminants are involved?
      Organics

 8.  Are nonaqueous liquids present?
      No                           "~

 9.  What are the aquifer materials?

      Sand  Fractured Rock    Other...SANDSTONE

10.  Describe special features of interest.
      Multi-aquifer contamination — groundwater in different strata moves
      in different directions

11•  What stage in the study/design/implementation process is this site?
     Is extraction in progress?
      Some extraction of high chlorides — French drains catching some
      floaters.   RCRA RFI in progress.

12.  Dates of ROD or other milestones
                                      49

-------
             EVALUATION OF GROUNDWATER EXTRACTION REMEDIES
                     EPA CONTRACT NO.  68-W8-009B
                           GENERAL SITE DATA

                            DATA BASE REPORT
1.  Site name and location/EPA Region
     GENRAD CORPORATION, MA      I

2.  Program
     RCRA

3.  Contact person
     JEFF  CHORMANN,  CHET MASEWSKI/MA DEQE,  BOSTON

4.  Objective of Groundwater  Extraction

     Interim objective(s)...  Plume  containment
     Final objective(s)... Aquifer  restoration

5.  Type of Extraction System and System Enhancements:
     Drilled Wells,  no system enhancements

6.  Type of Site
     Manufacturing/processing plant

7,  What type  of contaminants are involved?
     Low sorption, Organics

8.  Are nonaqueous liquids present?
     No

 9.  What are  the aquifer materials?

      Sand   Gravel

10.  Describe special features of interest.
      Both  unconsolidated and bedrock aquifers are contaminated.  Near-by
      surface waters are intercepting a portion of the contamination.

11.   What stage in the study/design/implementation process is this site?
     Is extraction in progress?
      Extraction/plume containment entering third season.  Decisions on
      additional extraction wells within concentrated portions of plume are
      being considered.

12.  Dates of ROD  or other milestones
                                        50

-------
             EVALUATION OF GROUNDWATER EXTRACTION REMEDIES
                     EPA CONTRACT NO.   68-W8-009B
                           GENERAL  SITE DATA

                             DATA BASE  REPORT
 1.   Site name and location/EPA Region
     GILSON ROADS, MA      I

 2.   Program
     Superfund

 3.   Contact person
     DICK WILLEY/EPA REGION  I

 4.   Objective of Groundwater Extraction

     Interim objective(s)... Plume containment
     Final objective(s)... Aquifer restoration

 5.   Type of Extraction  System  and System Enhancements:
     Drilled Wells, no  system  enhancements

 6.   Type of Site
     Hazardous  waste dump

 7.   What type of contaminants  are involved?
     Organics and Metals

 8.   Are nonaqueous  liquids present?
     No

 9.   What are the aquifer materials?

     Sand  Gravel   Fractured Rock  Interbedded Sediments

10.   Describe special features  of interest.
     o Pump and treat  stripping tower/carbon filter
     o Slurry  wall surrounds  entire site

11.   What stage  in the  study/design/implementation process is this site?
     Is extraction in progress?
     2 years in operation, evaluation of ROD requirement

12.   Dates  of ROD or other  milestones
                                       51

-------
              EVALUATION OF GROUNDWATER EXTRACTION REMEDIES
                      EPA CONTRACT NO.  68-W8-009B
                            GENERAL SITE DATA

                             DATA BASE REPORT
 1.  Site name and location/EPA Region
      GREAT LAKES CHEMICAL CORP, AR     VI

 2.  Program
      RCRA, AND STATE LEAD

 3.  Contact person
      STEVE SLATEN/EPA REGION VI

 4.  Objective of Groundwater Extraction

      Interim objective(s)... Plume containment
      Final objective(s)... Aquifer restoration

 5.  Type of Extraction System and System Enhancements:
      Drilled Wells, no system enhancements
      AND TRENCHES
 6.  Type of Site
      Hazardous waste dump

 7.  What type of contaminants are involved?
      Organics

 8.  Are nonaqueous liquids present?
      No

 9.  What are the aquifer materials?

      Clay  Sand

10.  Describe special features of interest.
      200 feet thick "beach sand" — high contamination  (up to 400,000 ppm
      TDS) .   Off site contamination not yet addressed -<- 500 onsite
      monitoring wells.

11.  What stage in the study/design/implementation process is this site?
     Is extraction in progress?
      Study/design phase

12.  Dates of ROD or other milestones
                                       52

-------
             EVALUATION OF GROUNDWATER EXTRACTION REMEDIES
                     EPA CONTRACT NO.  68-W8-009B
                           GENERAL  SITE  DATA

                            DATA BASE REPORT
 1.   Site  nama  and  location/EPA  Region
     GROVELAND WELLS, MA     I

 2.   Program
     Superfund

 3.   Contact person
     JAY  NAPARSTEK/MASSACHUSETTS  DEQE,  BOSTON

 4.   Objective  of Groundwater Extraction

     Interim objective(s)... Well head treatment
     Final objective(s)...  Plume  containment

 5.   Type  of Extraction  System and System Enhancements:
     Drilled Wells,  no  system enhancements

 6.   Type  of Site
     Manufacturing/processing plant

 7.   What  type  of  contaminants are involved?
     Organics

 8.   Are nonaqueous liquids  present?
     No

 9.   What  are the  aquifer materials?

      Sand

10.   Describe special features of  interest.
      Shallow bedrock and overburden contamination

11.   What stage in the study/design/implementation process is this site?
     Is extraction in progress?
      Remedial design for operable unit I/Remedial investigation for
      operable unit II

12.   Dates of ROD or other milestones
                                        53

-------
               EVALUATION OF GROUNDWATER EXTRACTION REMEDIES
                       EPA CONTRACT  NO.   68-W8-009B
                             GENERAL SITE DATA

                              DATA BASE  REPORT
 1.  Site name and  location/EPA  Region
      HARRIS CORPORATION,  FL      IV

 2.  Program
      Superfund, AND RCRA

 3.  Contact person
      ROBERT SANDS/HARRIS  CORP.,  MELBOURNE, FL

 4.  Objective of Groundwater Extraction

      Interim objective(s)... Plume containment, WELL HEAD TRTMT
      Final objective(s)... Aquifer restoration

 5.  Type of Extraction  System and System Enhancements:
      Drilled Wells, no  system enhancements

 6.  Type of Site
      Manufacturing/processing plant

 7.  What type of contaminants are involved?,
      Organics and Metals

 8.  Are nonaqueous liquids present?
      No

 9.  What are the aquifer materials?

      Clay  Silt  Sand

10.  Describe special features of interest.
      Two separate treatment systems:  1) at GDU 2) at Harris

11.  What stage in the study/design/implementation process is this site?
     Is extraction in progress?
      GDU startup:  4/84
      Harris stage 1 and 2:  5/85
      Harris stage 3:  9/85

12.  Dates of ROD or other milestones
                                       54

-------
 6.
              EVALUATION OF GROUNDWATER EXTRACTION REMEDIES
                      EPA CONTRACT NO.   68-W8-009B
                            GENERAL SITE DATA

                             DATA BASE  REPORT
Site name and location/EPA Region
 HELEVA LANDFILL, PA     III

Program
 Superfund

Contact person
 RICHARD WATMAN/EPA REGION III

Objective of Groundwater Extraction

 Interim objective(s)... Plume containment
 Final objective(s)... Aquifer restoration

Type of Extraction System and System Enhancements:
 Unknown, no system enhancements

Type of Site
 Hazardous waste dump
 7.   What type of contaminants are involved?
      Organics

 8.   Are nonaqueous liquids present?
      Yes, More dense than water.

 9.   What are the aquifer materials?

      Limestone

10.   Describe special features of interest.
11.  What stage in the study/design/implementation process is this site?
     Is extraction in progress?
      Design stage

12.  Dates of ROD or other milestones

-------
                            EVALUATION OF GROUNDWATER EXTRACTION REMEDIES
                                    EPA CONTRACT NO.  68-W8-009B
                                          GENERAL SITE DATA

                                           DATA BASE REPORT
               1.  Site name and location/EPA Region
                    HOECHST/CELANESE NPL SITE,  NCIV

               2.  Program
                    Superfund

               3.  Contact person
                    MICHELLE GLENN/EPA REGION IV

               4.  Objective of Groundwater Extracti6n

                    Interim objective(s)... Unknown
                    Final objective(s)...  Aquifer restoration

               5.  Type of Extraction System and System Enhancements;
                    Drilled Wells,  Pulsed Pumping

               6.  Type of Site
                    Manufacturing/processing plant

               7.  What type of contaminants are involved?
                    Organics and Metals

               8.  Are nonaqueous liquids  present?
                    No

               9.  What are the aquifer materials?

                    Fractured Rock

              10.  Describe special features of interest.
                    Two-tiered extraction  system,  one set  of  wells  near the  source  areas,
                    another near the property boundaries.   Treated  ground-water  to  be
                    re-used and discharged through NPDES outfall.

              11.  What stage in the study/design/implementation process is  this site?
                   Is  extraction  in progress?
                    Final design  and  system start-up.
                    months.
Extraction to begin within 2-3
              12.   Dates  of  ROD  or  other milestones
                                                     56
_

-------
              EVALUATION  OF  GROUNDWATER EXTRACTION REMEDIES
                      EPA CONTRACT  NO.   68-W8-009B
                            GENERAL SITE DATA

                             DATA BASE  REPORT
 1.   Site  name  and location/EPA Region
      IBM  -  DAYTON,  NJ     II

 2.   Program
      State  Lead

 3.   Contact person
      GEORGE CAMPBELL/NJ DEP

 4.   Objective  of Groundwater  Extraction

      Interim objective(s)...  Unknown
      Final  objective(s)... Aquifer restoration

 5.   Type  of Extraction System and System Enhancements:
      Drilled Wells, no system enhancements

 6.   Type  of Site
      Manufacturing/processing plant

 7.   What  type  of contaminants are involved?
      Organics

 8.   Are nonaqueous liquids present?
      Yes, More dense than water.

 9.   What  are the aquifer materials?

      Clay  Sand  Gravel

10.   Describe special features of interest.
      Remediation appeared complete and was stopped in September 1984 but
      concentrations of contaminants rose.  System will be turned on again
      in 1989.   Containment,  not restoration will be the new objective
      because of DNAPLs

11.   What stage in the study/design/implementation process is this site?
     Is extraction in progress?
      Problem discovered:  December 1977
      Extraction:  March 1978 to Sepember 1984
      Shutoff:   September 1984

12.   Dates of ROD or other milestones
                                       57

-------
              EVALUATION OF GROUNDWATER EXTRACTION REMEDIES
                      EPA CONTRACT NO.  68-W8-009B
                            GENERAL SITE DATA

                             DATA BASE REPORT
 1.  Site name and location/EPA Region
      IBM — SAN JOSE, CA     IX

 2.  Program
      State Lead

 3.  Contact person
      PHIL MITCHELL/IBM CORP., SAN JOSE, CA

 4.  Objective of Groundwater Extraction

      Interim objective(s)... Plume containment, NONAQUEOUS
      Final objective(s)... Aquifer restoration

 5.  Type o£ Extraction System and System Enhancements:
      Drilled Wells, no system enhancements

 6.  Type of Site
      Manufacturing/processing plant

 7.  What type of contaminants are involved?
      Organics

 8.  Are nonaqueous liquids present?
      No

 9.  What are the aquifer materials?

      Clay  Silt  Sand  Gravel

10.  Describe special features of interest.
      Multi-aquifer contamination

11.  What stage in the study/design/implementation process is this site?
     Is extraction in progress?
      Extraction started at several locations.  Start dates were May 1982 to
      December 1985.

12.  Dates of ROD or other milestones
                                       58

-------
             EVALUATION OF GROUNDWATER EXTRACTION REMEDIES
                     EPA CONTRACT NO.  68-W8-009B
                           GENERAL SITE DATA

                            DATA BASE REPORT
'1.  Site name and location/EPA Region
     INDIAN BEND WASH, AZIX

 2.  Program
     Superfund

 3.  Contact person
     JEFF ROSENBLOOM/EPA REGION  IX

 4.  Objective of Groundwater Extraction

     Interim objective(s)... Plume containment
     Final objective
-------
             EVALUATION  OF  GROUNDWATER EXTRACTION REMEDIES
                     EPA CONTRACT  NO.   68-W8-009B
                            GENERAL SITE DATA

                            DATA BASE  REPORT
1.  Site name and location/EPA Region
     INTERNATIONAL PAPER CO . , MS     IV

2.  Program
     RCRA

3.  Contact person
     BEVERLY FOSTER/EPA REGION IV, RCRA BRANCH

4.  Objective of Groundwater Extraction

     Interim objective (s) ... Nonaqueous liquid recovery
     Final objective (s) ... Aquifer restoration

5-  Type of Extraction System and System Enhancements :
     Drilled Wells,  no system enhancements

6.  Type of Site
     Manufacturing/processing plant

7.  What type of contaminants are involved?
     Organics

8-  Are nonaqueous liquids present?
     Yes,  More dense than water.
 9-
    What are the aquifer materials?

     Silt  Sand
    Describe special features of interest.
     ACLs issued.
-1-1*
    What stage in the study/design/implementation process is this site?
    Is extraction in progress?
     Well installation and some pumping

    Dates of ROD  or other milestones
                                      60

-------
             EVALUATION OF GROUNDWATER EXTRACTION REMEDIES
                     EPA CONTRACT NO.  68-W8-009B
                           GENERAL SITE DATA

                            DATA BASE REPORT
1.  Site name and location/EPA Region
     KURT MANUFACTURING, MN     V

2.  Program
     State Lead

3.  Contact person
     ENRIQUE GENTZSCH/MPCA

4.  Objective of Groundwater Extraction

     Interim objective(s)... Unknown
     Final objective(s)... Unknown

5.  Type of Extraction  System and System Enhancements:
 6.
 Drilled Wells,  no system enhancements

Type of Site
 Manufacturing/processing plant
 7.   What type of contaminants  are involved?
      Organics

 8.   Are nonaqueous liquids present?
      No

 9.   What are the aquifer materials?
10.   Describe special features of interest.
      Unable to pump significant volumes of water

11.   what stage in the study/design/implementation process is this site?
     Is extraction in progress?
12.  Dates of ROD or other milestones
                                        61

-------
               EVALUATION OF GROUNDWATER EXTRACTION REMEDIES
                       EPA CONTRACT NO.  68-W8-009B
                             GENERAL SITE DATA

                              DATA BASE REPORT
  !•   Site name and location/EPA Region
       M-AREA SAVANNAH RIVER PLT,  SC     IV

  2.   Program
       DOE

  3.   Contact person
       HARRY MATHIS/SC DHEC

  4.   Objective of Groundwater Extraction

       Interim objective (s) ...  Plume containment
       Final objective (s) ...  Aquifer restoration

  5-   Type of Extraction  System and System Enhancements:
       Drilled Wells,  no  system enhancements

  6.   Type of Site
       Manufacturing/processing plant

  7*   What type of contaminants  are  involved?
       Low sorption, Organics
 8 .
 9.
11 •
     Are nonaqueous liquids present?
      No

     What are the aquifer materials?

      Clay  Silt  Sand  Interbedded Sediments

     Describe special features of interest.
      Water table 60 -120 feet below land surface ,(BLS)
     What stage in the study/design/implementation process is this  site?
     Is extraction in progress?
      Implementation phase
12.  Dates of ROD or other milestones
                                       62

-------
 6.
             EVALUATION OF GROUNDWATER EXTRACTION REMEDIES
                     EPA CONTRACT NO.  68-W8-009B
                           GENERAL  SITE DATA

                             DATA BASE REPORT
Site name and location/EPA Region
 MEPCO/ELECTRA, NJ     II

Program
 State Lead, NJ ECRA

Contact person
 KEN SMITH/NJ DEP

Objective of Groundwater Extraction

 Interim objective(s)... Plume containment
 Final objective(s)... Aquifer restoration

Type of Extraction  System and System Enhancements:
 Drilled Wells, no  system enhancements

Type of Site
 Manufacturing/processing plant
 7.   What type of contaminants are involved?
      Organics

 8.   Are nonaqueous liquids present?
      No

 9.   What are the aquifer materials?

      Silt  Sand

10.   Describe special features of interest.
11.  What stage in the study/design/implementation process is this site?
     Is extraction in progress?
12.   Dates of ROD or other milestones
                                        63

-------
              EVALUATION OF GROUNDWATER EXTRACTION REMEDIES
                      EPA CONTRACT NO.  68-W8-009B
                            GENERAL SITE DATA

                             DATA BASE REPORT
 1.  Site name and location/EPA Region
      MILLCREEK, PA     III

 2.  Program
      Superfund

 3.  Contact person
      ANTHONY KOLLER/EPA REGION III

 4.  Objective of Groundwater Extraction

      Interim objective(s)... Leachate collection
      Final objective(s)... Aquifer restoration

 5.  Type of Extraction System and System Enhancements:
      Trenches, no system enhancements

 6.  Type of Site
      Hazardous waste dump

 7.  What type of contaminants are involved?
      Organics and Metals

 8.  Are nonaqueous liquids present?
      No

 9.  What are the aqriifer materials?

      Silt  Sand  Gravel

10.  Describe special features of interest.
      Adjacent to Lake Erie
11.  What stage in the study/design/implementation process is this site?
     Is extraction in progress?
      Design phase

12.  Dates of ROD or other milestones
                                        64

-------
             EVALUATION OF GROUNDWATER EXTRACTION REMEDIES
                     EPA CONTRACT NO.  68-W8-009B
                           GENERAL SITE DATA

                            DATA BASE REPORT
1.  Site name and location/EPA Region
     MOBAY CORPORATION, TX     VI

2.  Program
     RCRA

3.  Contact person
     MARIA DANIEL/EPA REGION VI

4.  Objective of Groundwater Extraction

     Interim 'objective(s)... Unknown
     Final objective(s)...  Plume containment

5.  Type of Extraction  System  and System Enhancements:
     Trenches,  no  system enhancements

6.  Type of Site
     Manufacturing/processing  plant

7.  What type of  contaminants  are involved?
     Organics

8.  Are nonaqueous liquids present?
     No

 9.  What  are  the  aquifer materials?

      Silt   Sand  Interbedded Sediments

10.  Describe  special features  of interest.
11.  What stage in the study/design/implementation process is this site?
     Is extraction in progress?
      No extraction at the present time.  Study/design stage

12.  Dates of ROD or other milestones
                                       65

-------
              EVALUATION OF GROUNDWATER EXTRACTION REMEDIES
                      EPA CONTRACT NO.   68-W8-009B
                            GENERAL SITE DATA

                             DATA BASE  REPORT
     Site name and location/EPA Region
      MOBAY CORPORATION,  WV     III

     Program
      RCRA

     Contact person
      DOUG DONER/EPA REGION III

     Objective of Groundwater Extraction

      Interim objective(s)... Unknown
      Final objective(s)... Plume containment

     Type of Extraction System and System Enhancements:
      Unknown, no system enhancements

     Type o£ Site
      Manufacturing/processing plant

     What type of contaminants are involved?
 8.   Are nonaqueous liquids present?
      No

 9.   What are the aquifer materials?
10.  Describe special features of interest.
11.  What stage in the study/deaign/implementation process is this site?
     Is extraction in progress?
12.  Dates of ROD or other milestones
                                        66

-------
             EVALUATION OF GROUNDWATER EXTRACTION REMEDIES
                     EPA CONTRACT NO.  68-W8-009B
                           GENERAL SITE DATA

                            DATA BASE REPORT
1.  Site name and location/EPA Region
     NATIONAL STARCH & CHEM..., NCIV

2.  Program
     Superfund

3.  Contact person
     RICH MUZA, GIEZELLE BENNETT/EPA REGION IV

4.  Objective of Groundwater Extraction

     Interim objective(s)... Plume containment
     Final objective(s)... Aquifer restoration

5.  Type of Extraction  System  and System Enhancements:
     Drilled Wells, Pulsed. Pumping

6.  Type of Site
     Manufacturing/processing  plant

7.  What type of contaminants  are involved?
     Low sorption, Organics

8.  Are nonaqueous liquids present?
     No

 9.  what are the aquifer materials?

     Fractured Rock     Other...SAPROLITE

10.  Describe special  features  of interest.
     Multi-aquifer contamination

11.  What  stage in the study/design/implementation process is this site?
     Is extraction  in  progress?
     Pre-design stage

12.  Dates  of ROD or  other  milestones
                                       67

-------
             EVALUATION OF  GROUNDWATER EXTRACTION REMEDIES
                     EPA CONTRACT  NO,   68-W8-009B
                            GENERAL SITE DATA

                            DATA BASE  REPORT
1-  Site name and location/EPA Region
     NICHOLS ENGINEERING, NJII

2.  Program
     State Lead

3.  Contact person
     KEN SMITH/NJ DEP

4.  Objective of Groundwater Extraction

     Interim objective(s)... Unknown
     Final objective(s)... Aquifer restoration

5-  Type of Extraction System and System Enhancements:
     Drilled Wells,  no system enhancements

6.  Type of Site
     Other, COMBUSTION LAB

7-  What type of contaminants are involved?
     Organics

8.  Are nonao^ieous liquids present?
     Yes,  More dense than water.

9-  What are the aquifer materials?

     Fractured Rock     Other... SHALE
10 •
11 •
    Describe special features of interest.
     Flow is mainly fracture flow
    What stage in the study/design/implementation process is this site?
    Is extraction in progress?
     One well began January 22,  1988.   Two more extraction wells began in
     January 1989.

    Dates of ROD or other milestones
                                      68

-------
              EVALUATION OF GROUNDWATER EXTRACTION REMEDIES
                      EPA' CONTRACT NO.   68-W8-009B
                            GENERAL SITE DATA

                             DATA BASE  REPORT
 1.   Site name and location/EPA Region
      NORTHERN TELECOM,  FL     IV                                  "

 2.   Program
      Other,  NONE

 3.   Contact person
      JEFF STARN/EPA REGION IV

 4.   Objective of Groundwater Extraction

      Interim objective(s)... Plume containment
      Final objective(s)... Aquifer restoration

 5.   Type of Extraction  System and System Enhancements:
      Drilled Wells,  Reinjection

 6.   Type of Site
      Manufacturing/processing plant

 7.   What type of contaminants are involved?
      Organics

 8.   Are nonaqueous liquids present?
      Yes, More dense than water.

 9.   What are the aquifer materials?

      Silt  Sand

10.   Describe, special features of interest.
      Aquifer has high permeability, low organic carbon.  Pulsed pumping of
      nearby municipal well led to added dispersion of contaminants

11.   What stage in the study/design/implementation process is this site?
     Is extraction in progress?
      Extraction began in early 1988

12.   Dates of ROD or other milestones
                                        69

-------
              EVALUATION OF GROUNDWATER EXTRACTION REMEDIES
                      EPA CONTRACT NO.  68-W8-009B
                            GENERAL SITE DATA

                             DATA BASE REPORT
 1.  Site name and location/EPA Region
      NORTHSIDE LANDFILL, WA     X

 2.  Program
      Superfund

 3.  Contact person
      NEIL THOMPSON, RENE FUENTES/EPA REGION X

 4.  Objective of Groundwater Extraction

      Interim objective(s)... Plume containment
      Final objective(s)... Aquifer restoration

 5.  Type of Extraction System and System Enhancements:
      Drilled Wells, no system enhancements

 6.  Type of Site
      Other, LANDFILL

 7.  What type of contaminants are involved?
      Organics

 8.  Are nonaqueous liquids present?
      No

 9.  What are the aquifer materials?

      Sand  Gravel

10.  Describe special features of interest.
      Contamination appears to be found along contact with valley  wall  in
      shallower areas

11.  What stage in the study/design/implementation process is  this site?
     Is extraction in progress?
      Planned stage
     X
12.  Dates of ROD or other milestones
                                       70

-------
             EVALUATION OF GROUNDWATER EXTRACTION  REMEDIES
                     EPA CONTRACT NO.  68-W8-009B
                           GENERAL SITE DATA

                            DATA BASE REPORT
 1.  Site name and. location/EPA Region
     OLIN CHEMICAL,  KY     IV

 2.  Program
     State  Lead

 3.  Contact person
     LAURA  HOSKINS/EPA REGION IV

 4.  Objective of Groundwater Extraction

     Interim objective(s)... Unknown
     Final  objective(s)...  Plume containment

 5.  Type of Extraction System and System Enhancements;
     Drilled Wells,  no system enhancements

 6.  Type of Site
     Manufacturing/processing plant

 7.  What type  of contaminants are involved?
     Organics

 8.  Are nonaqueous liquids present?
     No

 9.  What are the aquifer materials?

     Clay   Silt  Sand  Gravel  Limestone

10.  Describe  special features of interest.
     Ranney wells used for extraction-

11.  What  stage in the study/design/implementation process is this site?
     Is extraction in progress?
     Ranney wells used for extraction

12.  Dates  of ROD or other milestones
                                       71

-------
                           EVALUATION OF GROUNDWATER EXTRACTION  REMEDIES
                                   EPA CONTRACT  NO.   68-W8-009B
                                         GENERAL SITE DATA

                                          DATA BASE  REPORT
               1.  Site name and location/EPA Region
                   OLIN CORP, AL     IV

               2.  Program
                   RCRA

               3.  Contact person
                   ARNOLD FELDMAN/EPA REGION IV

               4.  Objective of Groundwater Extraction

                   Interim objective(s)... Unknown
                   Final objective(s)... Aquifer restoration

               5.  Type of Extraction System and System Enhancements;
                   Drilled Wells, no system enhancements

               6.  Type of Site
                   Manufacturing/processing plant

               7.  What type of contaminants are involved?
                   Organics and Metals

               8.  Are nonaqueous liquids present?
                   Yea, More dense than water.

               9.  What are the aquifer materials?

                   Sand

             10.  Describe special features of interest.
                   Plume is 4000 feet long.  Four wells pumping 130 gpm each, each well
                   has individual treatment plant.

             11.  What stage in the study/design/implementation process is this site?
                  Is extraction in progress?
                   Have been pumping about 2 years.

             12.  Dates of ROD or other milestones
                                                    72
.

-------
              EVALUATION OF GROUNDWATER EXTRACTION REMEDIES
                      EPA CONTRACT NO.  68-W8-009B
                            GENERAL' SITE DATA

                             DATA BASE REPORT
 li   Site name and location/EPA Region
      PALMETTO WOOD,  SC     IV

 2.   Program
      Superfund

 3.   Contact person
      BART REEDY/EPA REGION IV

 4i   Objective of Groundwater Extraction

      Interim objective(s)... Unknown
      Final objective(s)...  Aquifer restoration

 5.   Type of Extraction System-and System Enhancements:
      Drilled Wells,  no system enhancements

 6.   Type of Site
      Manufacturing/processing plant

 7.   What type of contaminants are involved?
      Organics and Metals

 8.   Are nonaqueous liquids present?                 "
      No

 9.   What are the aquifer materials?                 :

      Silt  Sand

10.   Describe•special features of interest.  -
11.  What stage in the study/design/implementation process is this site?
     Is extraction in progress?                  ,
      Finalizing feasibility study, extraction system has been modelled.

12.  Dates of ROD or other milestones
                                       73

-------
10,
11,
              EVALUATION OF GROUNDWATER EXTRACTION REMEDIES
                      EPA CONTRACT NO.  68-W8-009B
                            GENERAL SITE DATA

                             DATA BASE REPORT
Site name and location/EPA Region
 PENSACOLA NAVAL AIR STA., FL     IV

Program
 DOD

Contact person
 K. MICHAEL GREEN/SOUTH DIV., NFEC, CHARLESTON SC

Objective of Groundwater Extraction

 Interim objective(s)...  Unknown
 Final objective(s)...  Plume containment

Type of Extraction System and System Enhancements;
 Drilled Wells, no system enhancements

Type of Site
 Other, WWTP

What type of contaminants are involved?
 Organics and Metals

Are nonaqueous liquids present?
 No

What are the aquifer materials?

 Clay  Sand

Describe apecial features of interest.
 Automatic standby pumps to maintain continuity of action

What stage in the study/design/implementation process is this site?
Is extraction in progress?
 Extraction has been ongoing since February 6, 1987
12.  Dates of ROD or other milestones
                                       74

-------
             EVALUATION OF GROUNDWATER EXTRACTION REMEDIES
                     EPA CONTRACT NO.   68-W8-009B
                           GENERAL  SITE DATA

                            DATA BASE  REPORT
 1.  Site name and location/EPA Region
     PERDIDO, AL      IV

 2.  Program
     Superfund

 3.  Contact person
     CAMILLA WARREN,  BEVERLY HOUSTON/EPA REGION IV

 4.  Objective of Groundwater Extraction

     Interim objective(s)...  Unknown
     Final objective(s)... Aquifer restoration

 5.  Type of Extraction  System and System Enhancements;
     Drilled Wells, no  system enhancements

 6.  Type of Site
     Other, TRAIN WRECK

 7.  What type of contaminants are involved?
     Organics

 8.  Are nonaqueous  liquids present?
     Yes, Less  dense  than water.

 9.  What are the aquifer materials?

     Sand

10.  Describe special  features of  interest.
     3 extraction wells pumping 10 gpm each

11.  What stage  in the study/design/implementation process is this site?
    Is extraction in  progress?
     Remedial Design

12.  Dates of ROD or other milestones
                                       75

-------
              EVALUATION, OF, GROUNDWATER EXTRACTION REMEDIES
                      EPA CONTRACT NO.  68-W8-009B
                            GENERAL SITE DATA

                            .DATA BASE REPORT
 1.  Site name and location/EPA Region
      PERMAPOST PRODUCTS CO., OR     X

 2.  Program
      RCRA, AND STATE LEAD

 3.  Contact person
      CHRISTY AHLSTROM/EPA REGION X

 4.  Objective of Groundwater Extraction
      Interim objective(s)... Plume containment
      Final objective(s)... Aquifer .restoration-,

 5.  Type of Extraction System and System Enhancements:
      Drilled Wells, no system enhancements

 6.  Type of Site
      Manufacturing/processing plant

 7.  What type of contaminants are involved?
      High sorption, Organics

 8.  Are nonaqueous liquids present?
      No                              . ,. . .   .

 9.  What are the aquifer materials?

      Silt  Sand

10.  Describe special features of interest.
11,
What stage in the study/design/implementation process is this site?
Is extraction in progress?
 Design completed; implementation to begin when, permit is issued.
12.  Dates o£ ROD or other milestones

-------
              EVALUATION OF GROUNDWATER EXTRACTION REMEDIES
                      EPA CONTRACT NO.  68-W8-009B
                            GENERAL SITE DATA

                             DATA BASE REPORT
 1.   Site name and location/EPA Region
      PHOENIX-GOODYEAR AIRPORT,  AZ     IX

 2.   Program
      Superfund

 3.   Contact person
      JEFF ROSENBLOOM/EPA REGION IX

 4.   Objective of Groundwater Extraction

      Interim objective(s)... Unknown
      Final objective(s)...  Plume containment

 5.   Type of Extraction System and System Enhancements;
      Drilled Wells,  Pulsed Pumping
      AND REINJECTION

 6.   Type of Site
      Manufacturing/processing plant

 7.   What type of contaminants are involved?
      Organics

 8.   Are nonaqueous liquids present?
      No

 9.   What are the aquifer materials?

        Other...ALLUVIAL MATERI

10.   Describe special features of interest.
      Aquifer interconnection

11.   What stage in the study/design/implementation process is this site?
     Is extraction in progress?
      Remedial action

12.   Dates of ROD or other milestones
                                        77

-------
              EVALUATION OF GROUNDWATER EXTRACTION REMEDIES
                      EPA CONTRACT NO.' 68-W8-009B
                            GENERAL SITE DATA

                             DATA BASE REPORT
 1.  Site name and location/EPA Region
      PONDERS CORNER, WA     X

 2.  Program
      Superfund

 3.  Contact person
      JANET O'HARA/EPA REGION X

 4.  Objective of Groundwater Extraction

      Interim objective(s)... Well head treatment
      Final objective(s)... Aquifer restoration

 5.  Type of Extraction System and System Enhancements;
      Drilled Wells, no system enhancements

 6.  Type of Site
      Other, DRY CLEANERS

 7.  What type of contaminants are involved?
      Low sorption, Organics

 8.  Are nonaqueous liquids present?
      No

 9.  What are the aquifer materials?

      Sand  Gravel

10.  Describe special features of interest.
      There is also a soil vapor extraction system

11.  What stage in the study/design/implementation process is this  site?
     Is extraction in progress?
      Implementation is underway

12.  Dates of ROD or other milestones
                                       78

-------
              EVALUATION OF GROUNDWATER EXTRACTION REMEDIES
                      EPA CONTRACT NO.  68-W8-009B
                            GENERAL. SITE DATA

                             DATA BASE REPORT
 1.  Site name and location/EPA Region
      REICHHOLD CHEMICAL, WA     X

 2.  Program
      RCRA

 3.  Contact person
      MARGARET SMALL/EPA REGION X, RCRA BRANCH

 4.  Objective of Groundwater Extraction

      Interim objective(s)... Plume containment
      Final objective(s)...  Aquifer restoration

 5.  Type of Extraction System and System Enhancements:
      Drilled Wells, no system enhancements
    ,  AND TRENCHES

 6.  Type of Site
      Manufacturing/processing plant

 7.  What type of contaminants are involved?
      High and Low sorption, Organics and Metals

 8.  Are nonaqueous liquids  present?
      No

 9.  What are the aquifer materials?

      Clay  Silt  Sand  Gravel  Interbedded Sediments    Other...DREDGE SPOILS

10.  Describe special features of interest.
      Upper aquifer - trench with extraction system to prevent runoff (plume
      containment)
      Intermediate aquifer - extraction systems to contain plume and restore
      aquifer

11.  What stage in the study/design/implementation process is this site?
     Is extraction in progress?
      Design and implementation stage

12.  Dates of ROD or other milestones
                                       79

-------
              EVALUATION OF GROUNDWATER EXTRACTION REMEDIES
                      EPA CONTRACT NO.  68-W8-009B
                            GENERAL SITE DATA

                             DATA BASE REPORT
 1.   Site name and location/EPA Region
      REICHHOLD PENSACOLA,  FL     IV

 2.   Program
      Other,  PRIVATE INDUSTR

 3.   Contact person
      ED CHILVERS/FL DER,  PENSACOLA, FL

 4.   Objective of Groundwater Extraction

      Interim objective(s)... Plume containment, AND NONAQUEOUS
      Final objective(s)... Aquifer restoration

 5.   Type of Extraction System and System Enhancements:
      Drilled Wells, Other

 6.   Type o£ Site
      Other,  SURFACE IMPOUND

 7.   What type of contaminants are involved?
      High sorption, Organics

 8.   Are nonaqueous liquids present?
      Yes, Less dense than water.

 9.   What are the aquifer materials?

      Sand

10.   Describe special features of interest.
      Innovative technology:  Pneumatic pump chosen as the remedy during the
      pilot study

11.   What stage in the study/design/implementation process is this site?
     Is extraction in progress?
      Construction phase (of the oil/water separator)

12.   Dates of ROD or other milestones
                                        80

-------
              EVALUATION OF GROUNDWATER EXTRACTION REMEDIES
                      EPA CONTRACT NO.  68-W8-009B
                            GENERAL SITE DATA

                             DATA BASE REPORT
 1.  Site name and location/EPA Region
      ROCKY MOUNTAIN ARSENSAL, CO     VIII

 2.  Program
      DOD

 3.  Contact person
      JAMES HANLEY/EPA REGION VIII'

 4.  Objective of Groundwater Extraction

      Interim objective(s)... Other, ALL: P,L,W,N
      Final objective(s)... Aquifer restoration

 5.  Type of Extraction System and System Enhancements:
      Drilled Wells, no system enhancements

 6.  Type of Site
      Other, NERVE GAS & PST

 7.  What type of contaminants are involved?
      High and Low sorption, Organics and Metals

 8.  Are nonaqueous liquids present?                      t
      Yes, Some more dense than water and some less dense than water.

 9•  What are the aquifer materials?

      Silt  Sand  Gravel

10.  Describe special features of interest.
11•   What stage in the study/design/implementation process is this site?
     Is extraction in progress?
      completing remedial investigation

12.   Dates of ROD or other milestones
                                       81

-------
              EVALUATION OF GROUNDWATER EXTRACTION REMEDIES
                      EPA CONTRACT NO.   68-W8-009B
                            GENERAL SITE DATA

                             DATA BASE  REPORT
 1.   Site name and location/EPA Region
      ROLLINS - BATON ROUGE,  LA     VI

 2.   Program
      RCRA

 3.   Contact person
      STEVE SLATEN/EPA REGION VI

 4.   Objective of Groundwater Extraction

      Interim objective(3)... Unknown
      Final objective(s)...  Plume containment

 5.   Type of Extraction System and System Enhancements:
      Drilled Wells,  no system enhancements

 6.   Type of Site
      Hazardous waste dump

 7.   What type of contaminants are involved?
      High and Low sorption,  Organics and Metals

 8.   Are nonaqueous liquids  present?
      No

 9.   What are the aquifer materials?

      Clay  Silt  Sand  Interbedded Sediments

10.   Describe special features of interest.
      3 "zones" of contamination — limited interconnection

11.   What stage in the study/design/implementation process is this site?
     Is extraction in progress?
      Pumping underway — studies to determine best system

12.   Dates of ROD or other milestones
                                        82

-------
10.
              EVALUATION OF GROUNDWATER EXTRACTION REMEDIES
                      EPA CONTRACT NO.  68-W8-009B
                            GENERAL SITE DATA

                             DATA BASE REPORT
Site name and location/EPA Region
 SAPP BATTERY, FL     IV

Program
 Superfund

Contact person
 MARTHA BERRY, JEFF STARN/EPA REGION IV

Objective of Groundwater Extraction

 Interim objective(s)... Unknown
 Final objective(s)... Aquifer restoration

Type of Extraction System and System Enhancements:
 Drilled Wells, no system enhancements

Type of Site
 Manufacturing/processing plant

What type of contaminants are involved?
 Metals

Are nonaqueous liquids present?
 Yes, More dense than water.

What are the aquifer materials?

 Silt  Sand    Other...SINKHOLE SEDIM.

Describe special features of interest.
 Numerous sinkholes onsite that may be pathways for vertical migration.
11.  What stage in the study/design/implementation process is this site?
     Is extraction in progress?
      Study stage

12.  Dates of ROD or other milestones
                                       83

-------
              EVALUATION OF GROUNDWATER EXTRACTION REMEDIES
                      EPA CONTRACT NO.  68-W8-009B
                            GENERAL SITE DATA

                             DATA BASE REPORT
 1.  Site name and location/EPA Region
      SCRDI/DIXIANA NPL SITE, SC     IV

 2.  Program
      Superfund

 3.  Contact person
      MICHELLE GLENN/EPA REGION IV

 4.  Objective of Groundwater Extraction

      Interim objective(s)— Unknown
      Final objective(s)... Aquifer restoration

 5.  Type of Extraction System and System Enhancements:
      Drilled Wells, Pulsed Pumping

 6.  Type of Site
      Manufacturing/processing plant

 7.  What type of contaminants are involved?
      Organics and Metals

 8.  Are nonaqueous liquids present?
      No

 9.  What are the aquifer materials?

      Interbedded Sediments

10.  Describe special features of interest.
11.
     What stage in the study/design/implementation process is this site?
     Is extraction in progress?
      Final design.  Extraction to begin in 3-6 months

12.  Dates of ROD or other milestones
                                       84

-------
             EVALUATION OF GROUNDWATER EXTRACTION REMEDIES
                     EPA CONTRACT NO.  68-W8-009B
                           GENERAL  SITE DATA

                            DATA BASE REPORT
 1.  Site name and location/EPA Region
     SEYMOUR RECYCLING,  IN     V

 2.  Program
     Superfund

 3.  Contact person
     MARGARET PEARCE/EPA REGION  V

 4.  Objective of Groundwater Extraction                   ., - : ..   .

     Interim objective(s)...  Plume containment
     Final objective(s)...  Aquifer restoration

 5.  Type of Extraction  System and System Enhancements:
     Drilled Wells, no  system enhancements

 6.  Type of Site
     Other, SOLVENT RECYCLE

 7.  What type of contaminants are involved?
     High and Low sorption, Organics and Metals

 8.  Are nonaqueous liquids  present?
     No

 9.  What are the aquifer materials?

     Clay   Silt Sand

10.  Describe special  features of interest.
     Multi-aquifer contamination — minimal contamination in the lower,
     cleaning up the  upper.  Treating the upper with 1)  air  stripping
     system 3)  multimedia  filter 3) carbon absorption columns 4)  discharges
     to Seymour sewer system

11.  What  stage  in the study/design/implementation process is this site?
     Is extraction  in progress?
      Starting design

12.   Dates  of ROD or  other milestones
                                       85

-------
              EVALUATION OF GROUNDWATER EXTRACTION REMEDIES
                      EPA CONTRACT NO.  68-W8-009B
                            GENERAL SITE DATA

                             DATA BASE REPORT
 1.  Site name and location/EPA Region
      SIDNEY MINE, FL     IV

 2.  Program
      RCRA

 3.  Contact person
      BEVERLY FOSTER/EPA REGION IV, RCRA BRANCH

 4.  Objective of Groundwater Extraction

      Interim objective(s)... Plume containment
      Final objective(s)... Aquifer restoration

 5.  Type o£ Extraction System and System Enhancements;
      Drilled Wells, Other
      Well Points & Trench
 6.  Type of Site
      Other, PHOSPHATE MINE

 7.  What type of contaminants are involved?
      Organics

 8.  Are nonaqueous liquids present?
      No

 9.  What are the aquifer materials?

      Clay  Sand

10.  Describe special features of interest.
      "Aquifer" is artificial product of mining process

11.  What stage in the study/design/implementation process is this site?
     Is extraction in progress?
      Implementation stage

12.  Dates of ROD or other milestones
                                       86

-------
             EVALUATION OF  GROUNDWATER EXTRACTION REMEDIES
                     EPA CONTRACT NO.  68-W8-009B
                            GENERAL  SITE DATA

                             DATA BASE  REPORT
 1.   Site  name  and location/EPA Region
      SITE A, FL      IV

 2.   Program
      Superfund

 3.   Contact person
      NICK CETO/EPA REGION IV

 4.   Objective  of Groundwater Extraction

      Interim objective(s)... Unknown
      Final  objective(s)...  Aquifer restoration
 5.   Type of Extraction System and System Enhancements;
      Drilled Wells,  no system enhancements
 6.   Type of Site
      Manufacturing/processing plant

 7.   What type of contaminants are involved?
      Organics

 8.   Are nonaqueous liquids present?
      No

 9.   What are the aquifer materials?

      Sand  Limestone

10.   Describe special features of interest.
      Plume extent not known to south of site.
      Monitoring network not dense

11.   What stage in the study/design/implementation process is this site?
     Is extraction in progress?
      Extraction in progress from August 1988 to January 1989

12.   Dates of ROD or other milestones
                                       87

-------
               EVALUATION OF  GROUNDWATER EXTRACTION REMEDIES
                       EPA CONTRACT  NO.   68-W8-009B
                             GENERAL SITE DATA

                              DATA BASE  REPORT
  1-   Site  name  and location/EPA Region
       SODYECO SITE, NCIV

  2.   Program
       Superfund, AND RCRA

  3.   Contact person
       RICH MUZA, GIEZELLE BENNETT/EPA REGION  IV

  4.   Objective  of  Groundwater Extraction

       Interim objective(s)... Plume containment
       Final  objective(s)... Aquifer restoration

  5-   Type  of Extraction  System  and System Enhancements;
       Drilled Wells, no  system  enhancements

  6.   Type  of Site
       Manufacturing/processing  plant

  7.   What  type of  contaminants  are involved?
       Low  sorption, Organics

  8.   Are nonao^ieous liquids present?
       No

  9.  What  are the  ao^iifer materials?

       Fractured Rock    Other...SAPROLITE

10.  Describe special features  of interest.
      Extraction networks designed for four CERCLA areas

11-  What  stage in the study/design/implementation process is this site?
     Is extraction in progress?
      Remedial design

12.  Dates of ROD or other milestones
                                       88

-------
             EVALUATION OF GROUNDWATER EXTRACTION REMEDIES
                     EPA  CONTRACT NO.  68-W8-009B
                           GENERAL  SITE DATA

                            DATA BASE REPORT
 1.   Site  name  and location/EPA Region
      SPARTAN TECHNOLOGY,  NM     VI

 2.   Program
      RCRA

 3.   Contact person
      BOBBY WILLIAMS/EPA REGION VI

 4.   Objective  of Groundwater Extraction

      Interim objective(s)... Unknown
      Final objective(s)...  Aquifer  restoration
 5.   Type of Extraction System and System Enhancements:
      Drilled Wells,  no system enhancements
 6.   Type of Site
      Manufacturing/processing plant

 7.   What type of contaminants are involved?
      Organics

 8.   Are nonaqueous liquids present?
      No

 9.   What are the aquifer materials?

      Sand  Gravel

10.   Describe special features of interest.
      Two aquifer layers are involved.  They are starting with the  shallow
      aquifer and will progress to the deep one later.

11.   What stage in the study/design/implementation process is  this  site?
     Is extraction in progress?
      Extraction started about 3 months ago.

12.   Dates of ROD or other milestones
                                        89

-------
              EVALUATION OF GROUNDWATER EXTRACTION REMEDIES
                      EPA CONTRACT NO.  68-W8-009B
                            GENERAL SITE DATA

                             DATA BASE REPORT
 1.  Site name and location/EPA Region
      STAUFFER - Id, AL     IV

 2.  Program
      Superfund, AND RCRA

 3.  Contact person
      BEVERLY FOSTER/EPA REGION IV, RCRA BRANCH

 4.  Objective of Groundwater Extraction

      Interim objective(s)... Unknown
      Final objective(s)— Aquifer restoration

 5.  Type of Extraction System and System Enhancements:
      Drilled Wells, no system enhancements

 6.  Type of Site
      Manufacturing/processing plant

 7.  What type of contaminants are involved?
      Metals

 8.  Are nonaqueous liquids present?
      Yes, More dense than water.

 9.  What are the aquifer materials?

      Silt  Sand

10.  Describe special features of interest.
11.  What stage in the study/design/implementation process is this site?
     Is extraction in progress?
      Have been pumping for several years

12.  Dates of ROD or other milestones
                                       90

-------
             EVALUATION; OF GROUNDWATER EXTRACTION REMEDIES
                     EPA CONTRACT NO.   68-W8-009B
                           GENERAL SITE DATA

                            DATA BASE REPORT
1.  site name and location/EPA Region
     TEXAS EASTMAN,  TXVI

2.  Program
     RCRA

3.  Contact person
     MARIA DANIEL/EPA REGION VI

4.  objective of Groundwater Extraction

     Interim objective(s)... Plume containment
     Final objective(s)... Aquifer restoration

5.  Type of Extraction System and System Enhancements:
 6.
 Drilled Wells,  no system enhancements

Type of Site
 Manufacturing/processing plant
 7.  what type of contaminants are  involved?
     Organics

 8.  Are nonaqueous liquids present?
     No

 9.  what are the ao^iifer materials?

     Silt   Sand  Interbedded Sediments

10.  Describe special  features of interest.


11.  what  stage in the study/design/implementation process is this site?
     la extraction in  progress?
     Extraction  in progress

12.   Dates  of ROD or other milestones
                                       91

-------
2.
3.
6.
8.
               EVALUATION OF GROUNDWATER EXTRACTION REMEDIES
                       EPA CONTRACT NO.  68-W8-009B
                             GENERAL SITE DATA


                              DATA BASE REPORT
      Site name and location/EPA Region
       TEXAS ECOLOGISTS,  TX     VI

      Program
       RCRA

      Contact person
       MARIA DANIEL/EPA REGION VI

      Objective of  Groundwater Extraction

       Interim  objective (s) . . .  Plume  containment,  LEACHATE  COLLEC
       Final objective (s) . . . Aquifer  restoration

      Type  of Extraction  System and System Enhancements :
       Drilled  Wells, no  system enhancements
       AND  TRENCHES

      Type  of Site
       Hazardous waste dump

      What  type of contaminants  are involved?
       Organics and Metals
                                                            /
      Are nonaqueous liquids present?
       No
 9-  What are the acruifer materials?
10•  Describe special features of interest.


11 *  What stage in the study/design/implementation process is this site?
     Is extraction in progress?
      Pumping/trench sump evacuation in progress.  Studies are required to
      determine adequacy/extent of plume.

12•  Pates of ROD or other milestones
                                       92

-------
             EVALUATION OF GROUNDWATER EXTRACTION REMEDIES
                     EPA CONTRACT NO.   68-W8-009B
                           GENERAL SITE DATA


                            DATA BASE REPORT
1.  Site name and location/EPA Region
     TIME OIL SITE, WA     X

2.  Program
     Superfund

3.  Contact person
     KEVIN ROCHLIN, RENE FUENTES/EPA REGION X

4.  Objective of Groundwater Extraction

     interim objective(s)... Aquifer restoration
     Final objective(s)— Plume containment

5.  Type  of Extraction  System  and  System Enhancements;
 6.
 Drilled Wells, Pulsed Pumping

Type of Site
 Hazardous waste dump
 7.   what type of contaminants  are involved?
      Organics

 8.   Are nonaqueous liquids present?
      Yes, More dense than water.

 9.   what are the aquifer materials?

      Silt  Sand  Gravel

10.   Describe special features of interest.


11.   what stage in the study/design/implementation process is this site?
     Is extraction in progress?
      Extraction in progress since May 1988

12.  Dates of ROD or other milestones
                                        93

-------
               EVALUATION OF GROUNDWATER EXTRACTION REMEDIES
                       EPA CONTRACT NO.  68-W8-009B
                             GENERAL SITE DATA

                              DATA BASE REPORT
      Site name and location/EPA Region
       TOMAH PRODUCTS, NJ     II

      Program
       State Lead,  ECRA

      Contact person
       KEN SMITH/NJ DEP
                                       .on
4-  Objective of Groundwater Bxtracti

     Interim objective(s)... Unknown
     Final objective(s)... Aquifer restoration

5-  Type of Extraction  System and System Enhancements
     Drilled Wells, no  system enhancements

6.  Type of Site
     Manufacturing/processing plant

7•  What type of contaminants are involved?
 8.
10.
     Organics

    Are nonaqueous liquids present?
    ~No

    What are the aquifer materials?

     Sand

    Describe special features of interest
11 •  What stage in the study/design/implementation process is  this  site?
     Is extraction in progress?
      Extraction started in 1984.  Documentation of system operation and
      progress is poor.

12.  Dates of ROD or other milestones
                                       94

-------
             EVALUATION OF GROUNDWATER EXTRACTION REMEDIES
                     EPA CONTRACT NO.  68-W8-009B
                           GENERAL SITE DATA

                            DATA BASE REPORT
1.  Site name and location/EPA Region
     TOWER CHEMICAL, FL      IV

2.  Program
     Superfund

3.  Contact person
     JOHN VARGO, JEFF  STARN/EPA  REGION  IV

4.  Objective of Groundwater Extraction

     Interim object!ve(s)— Unknown
     Final objective(s)...  Aquifer restoration

5.  Type of Extraction System and System Enhancements:
     Drilled Wells, no system enhancements

6.  Type of Site
     Manufacturing/processing plant

7.  What type of contaminants are involved?
     High  sorption, Organics and Metals

8.  Are nonaqueous  liquids present?
     Yes,  More  dense  than water.

 9.  What are the aquifer materials?

     Clay   Sand  Interbedded Sediments
10.  Describe special features of interest.
      Extraction well in relic sinkhole.
11.  What stage in the study/design/implementation process is this site?
     Is extraction in progress?
      Study stage

12.  Dates of ROD or other milestones
                                        95

-------
              EVALUATION OF GROUNDWATER EXTRACTION REMEDIES
                      EPA CONTRACT NO.  68-W8-009B
                            GENERAL SITE DATA

                             DATA BASE REPORT
 1.  Site name and location/EPA Region
      TUSCON INT'L AIRPORT AREA, AZ     IX

 2.  Program
      Superfund

 3.  Contact person
      DANIEL OPALSKI/EPA REGION IX

 4.  Objective of Groundwater Extraction

      Interim objective(s)— Plume containment
      Final objective(s)... Aquifer restoration

 5.  Type of Extraction System and System Enhancements;
      Drilled Wells,  Reinjection

 6.  Type of Site
      Manufacturing/processing plant

 7.  What type of contaminants are involved?
      Organics

 8.  Are nonaqueous liquids present?
      No

 9.  What are the aquifer materials?

      Interbedded Sediments

10.  Describe special features of interest.
      Multi-aquifer contamination.  Several extraction systems will be in
      operation within close proximity of one another.

11.  What stage in the study/design/implementation process is this site?
     Is extraction in progress?
      Implementation stage for DOD part of the site.
      Approaching design stage for remainder of the site
12.  Dates of ROD or other milestones
                                        96

-------
              EVALUATION OF  GROUNDWATER EXTRACTION  REMEDIES
                      EPA CONTRACT  NO.   68-W8-009B
                            GENERAL SITE DATA

                             DATA BASE  REPORT
 6.
 7.
 8.
 9.
10.
Site name and location/EPA Region
 UN-NAMED, FL     IV

Program
 Other, PRIVATELY OWNED

Contact person
 JEFF STARN, NICK CETO/EPA REGION IV        '

Objective of Groundwater Extraction

 Interim objective(s)... Unknown
 Final objective(s)... Aquifer restoration

Type of Extraction System and System Enhancements;
 Drilled Wells, no system enhancements

Type of Site
 Manufacturing/processing plant

What type of contaminants are involved?
 Low sorption, Organics

Are nonaqueous liquids present?
 Yes, More dense than water.

What are the aquifer materials?

 Sand

Describe special features of interest.
11.  What stage in the study/design/implementation process is this site?
     Is extraction in progress?
      Have been pumping for several months

12.  Dates of ROD or other milestones
                                        97

-------
              EVALUATION OF GROUNDWATER EXTRACTION REMEDIES
                      EPA CONTRACT NO.  68-W8-009B
                            GENERAL SITE DATA

                             DATA BASE REPORT
 1.  Site name and location/EPA Region
      UNION CARBIDE, PONCE, PR     II

 2.  Program
      RCRA

 3.  Contact person
      STEVE KNIGHT/EPA REGION II

 4.  Objective o£ Groundwater Extraction.

      Interim objective(s)... Unknown
      Final objective(s)... Plume containment

 5.  Type of Extraction System and System Enhancements;
      Drilled Wells, no system enhancements

 6.  Type of Site
      Manufacturing/processing plant

 7.  What type of contaminants are involved?
      Organics

 8.  Are nonaqueous liquids present?
      Yes, Some more dense  than water and some less dense than water.

 9.  What are the aquifer materials?

      Interbedded Sediments    Other...ALLUVIAL SEDIMT

10.  Describe special features of interest.
      Need to avoid emulsifying the NAPL

11.  What stage in the study/design/implementation process is this site?
     Is extraction in progress?
      Design stage

12.  Dates of ROD or other  milestones
                                       98

-------
             EVALUATION OF GROUNDWATER EXTRACTION REMEDIES
                     EPA CONTRACT NO.  68-W8-009B
                           GENERAL SITE DATA

                            DATA BASE REPORT
1.  site name and location/EPA Region
     UNITED CHROME PRODUCTS, ORX

2.  Program
     Superfund

3.  Contact person
     LOREN MCPHILLIPS/EPA REGION X

4.  Objective of Groundwater Extraction

     Interim objective(s)... Unknown
     Final objective(s)... Aquifer restoration

5.  Type of Extraction  System and System Enhancements:
     Well Points, Pulsed Pumping

6.  Type of Site
     Manufacturing/processing plant
 7.   what type of contaminants  are  involved?
      Metals
 8.   Are  nonaqueous  liquids  present?
      No

 9.   What are the  aquifer materials?

      Sand

10.   Describe special features of interest.
      Shallow aquifer highly contaminated, deeper aquifer somewhat
      contaminated.

11.   what stage in the study/design/implementation process is this site?
     Is extraction in progress?
      Implementation stage

12.   Dates of ROD  or other milestones
                                       99

-------
              EVALUATION OF GROUNDWATER EXTRACTION REMEDIES
                      EPA CONTRACT NO.  68-W8-009B
                            GENERAL SITE DATA

                             DATA BASE REPORT
 1.  Site name and location/EPA Region
      UPJOHN, PR     II

 2.  Program
      Superfund, AND RCRA

 3.  Contact person
      STEVE KNIGHT/EPA REGION II

 4.  Objective of Groundwater Extraction

      Interim objective(s)... Unknown
      Final objective(s)... Aquifer restoration

 5.  Type of Extraction System and System Enhancements;
      Drilled Wells, no system enhancements

 6.  Type of Site
      Manufacturing/processing plant

 7.  What type of contaminants are involved?
 8.


 9.



10.
 Organics

Are nonao^ieous lio^iids present?
 Yes, More dense than water.

What are the aquifer materials?

 Interbedded Sediments  Limestone
Describe special features of interest.
 Multi-aquifer, sediments and karst
11.  What stage in the study/design/implementation process is this site?
     Is extraction in progress?
      Construction stage

12.  Dates of ROD or other milestones
                                      100

-------
             EVALUATION OF GROUNDWATER EXTRACTION REMEDIES
                     EPA CONTRACT NO.  68-W8-009B
                           GENERAL SITE DATA

                            DATA BASE REPORT
1.  Site name and location/EPA Region
     UTAH POWER & LIGHT CO., ID     X

2.  Program
     RCRA

3.  Contact person
     MARGARET SMALL/EPA REGION X, RCRA BRANCH

4.  Objective of Groundwater Extraction

     Interim objective(s)... Unknown
     Final objective(s)..."'Plume containment

5.  Type of Extraction  System and System Enhancements;
     Drilled Wells, Pulsed  Pumping

6.  Type of Site
     Other, WOOD TREATER

7.  what type  of contaminants.are involved?
     Organics
 8.   Are nonaqueous liquids present?
      Yes,  More dense than water.
 9.   What are the aquifer materials?   '

      Sand  Gravel  Fractured Rock    Other...FRACT. BASALT

10.   Describe special features of interest.
      Ground water contamination 130 feet below the ground surface.
      Contamination in the two uppermost aquifers

11.   What stage in the study/design/implementation process is this site?
     Is extraction in progress?
      Extraction on-going

12.   Dates of ROD or other milestones
                                       101

-------
              EVALUATION OF GROUNDWATER EXTRACTION REMEDIES
                      EPA CONTRACT NO.  68-W8-009B
                            GENERAL SITE DATA

                             DATA BASE REPORT
 1.  Site name and location/EPA Region
      VERONA WELL FIELD, MI     V

 2.  Program
      Superfund

 3.  Contact person
      MARGARET GUERRIERO/EPA REGION V

 4.  Objective of Groundwater Extraction

      Interim objective(s)... Plume containment
      Final objective(s)... Unknown

 5.  Type of Extraction  System and System Enhancements;
      Drilled Wells, no  system enhancements

 6.  Type of Site
      Manufacturing/processing plant

 7.  What type of contaminants are involved?
      Organics

 8.  Are nonaqueous liquids present?
      Yes, Less dense than water.

 9.  What are the aquifer materials?

      Silt  Sand

10.  Describe special features of interest.
      Innovative technology:  Soil vapor extraction

11.  What stage in the study/design/implementation process is  this  site?
     Is extraction in progress?
      Innovative technology:  Soil vapor'extraction

12.  Dates of ROD or other milestones
                                       102

-------
              EVALUATION OF GROUNDWATER EXTRACTION REMEDIES
                      EPA CONTRACT NO.   68-W8-009B
                            GENERAL SITE DATA

                             DATA BASE  REPORT
 1.   Site name and location/EPA Region
      VILLE MERCIER,  QUEBE,

 2.   Program.
      Other,  ENVIR. CANADA

 3.   Contact person
      QUEBEC MINISTRY OF ENVIRONMENT

 4.   Objective of Groundwater Extraction

      Interim objective(s)... Unknown
      Final objective(s)...  Plume containment

 5.   Type of Extraction System and System Enhancements:
      Drilled Wells,  no system enhancements

 6.   Type of Site
      Hazardous waste dump

 7.   What type of contaminants are involved?
      High and Low sorption,  Organics

 8.   Are nonaqueous liquids present?
      Yes, More dense than water.
 9.  What are the aquifer materials?

      Fractured Rock  Interbedded Sediments

10.  Describe special features of interest.
Other...GLACIAL SEDIMNT
11.   What stage in the study/design/implementation process is this site?
     Is extraction in progress?
      Extraction started in 1984

12.   Dates of ROD or other milestones
                                       103

-------
              EVALUATION OF GROUNDWATER EXTRACTION REMEDIES
                      EPA CONTRACT NO.  68-W8-009B
                            GENERAL SITE DATA

                             DATA BASE REPORT
10.
Site name and location/EPA Region
 W.R. GRACE, MA     I

Program
 Superfund

Contact person
 JAY NAPARSTEK/MASSACHUSETTS DEQE, BOSTON

Objective of Groundwater Extraction

 Interim objective(s)... Well head treatment
 Final objective(s)...  Plume containment

Type of Extraction System and System Enhancements;
 Drilled Wells, no system enhancements

Type of Site
 Manufacturing/processing plant

What type of contaminants are involved?
 Organics

Are nonaqueous liquids present?
 Yes, More dense than water.

What are the aquifer materials?

 Sand  Gravel

Describe special features of interest.
11.  What stage in the study/design/implementation process is this site?
     Is extraction in progress?
      Implementation in progress
12.  Dates of ROD or other milestones
                                       104

-------
              EVALUATION OF GROUNDWATER EXTRACTION REMEDIES
                      EPA CONTRACT NO.   68-W8-009B
                            GENERAL SITE DATA

                             DATA BASE  REPORT
10
Site name and location/EPA Region
 WAMCHEM SITE, SC     IV

Program
 Superfund

Contact person
 RICH MUZA, GIEZELLE BENNETT/EPA REGION IV

Objective of Groundwater Extraction

 Interim objective(s)... Plume containment
 Final objective(s)... Aquifer restoration

Type of Extraction System and System Enhancements:
 Drilled Wells, no system enhancements

Type of Site
 Manufacturing/processing plant

What type of contaminants are involved?
 Low sorption, Organics

Are nonaqueous liquids present?
 No

What are the aquifer materials?

 Silt  Sand

Describe special features of interest.
11.  What stage in the study/design/implementation process is this site?
     Is extraction in progress?
      Pre-design stage

12.  Dates of ROD or other milestones
                                       105

-------
              EVALUATION OF GROUNDWATER EXTRACTION REMEDIES
                      EPA CONTRACT NO.   68-W8-009B
                            GENERAL SITE DATA

                             DATA BASE  REPORT
 1.   Site name and location/EPA Region
      WESTERN PROCESSING,  WA     X

 2.   Program
      Superfund

 3.   Contact person
      JUDI SCHWARZ/EPA REGION X

 4.   Objective of Groundwater Extraction

      Interim objective(s)... Plume containment
      Final objective(s)...  Aquifer restoration

 5.   Type of Extraction System and System Enhancements:
      Drilled Wells, Reinjection
      Well Points

 6.   Type of Site
      Hazardous waste dump

 7.   What type of contaminants are involved?
      High and Low sorption, Organics and Metals

 8.   Are nonaqueous liquids present?
      Yes, More dense than water.

 9.   What are the aquifer materials?

      Clay  Silt  Sand  Interbedded Sediments

10.   Describe special features of interest.
11.  What stage in the study/design/implementation process is this site?
     Is extraction in progress?
      Implementation stage

12.  Dates of ROD or other milestones
                                       106

-------
              EVALUATION OF GROUNDWATER EXTRACTION REMEDIES
                      EPA CONTRACT NO.  68-W8-009B
                            GENERAL  SITE DATA

                             DATA BASE REPORT
 1.  Site name and location/EPA Region
      WHITTACKER SITE, MN     V

 2.  Program
      State Lead

 3.  Contact person
      PAUL DURKEE/MPCA

 4.  Objective of Groundwater Extraction

      Interim objective(s)... Plume containment
      Final objective(s)... Aquifer restoration

 5-  Type of Extraction System and System Enhancements:
      Drilled Wells, no system enhancements
      EXCAVATED SUMP

 6.  Type of Site
      Manufacturing/processing plant

 7.  What type of contaminants are involved?
      Organics

 8.  Are nonaqueous liquids present?
      No

 9.  What are the aquifer materials?

      Clay  Silt  Sand

10.  Describe special features of interest.
11.
What stage in the study/design/implementation process is this site?
Is extraction in progress?
 Extraction began in 1985
12.   Dates of ROD or other milestones
                                      107

-------
              EVALUATION OF GROUNDWATER EXTRACTION REMEDIES
                      EPA CONTRACT NO.  68-W8-009B
                            GENERAL SITE DATA

                             DATA BASE REPORT
 1.   Site name and location/EPA Region,.
      WILSON CORNERS (KSC),  FL     IV

 2.   Program
      RCRA

 3.   Contact person
      DAVID BRENTZEL/EPA REGION IV

 4.   Objective of Groundwater Extraction

      Interim objective(s)...  Unknown
      Final objective(s)...  Aquifer restoration
 5.  Type of Extraction System and System Enhancements:
      Drilled Wells, no system enhancements
 6.  Type of Site
      Other, ROCKET PARTS

 7.  What type of contaminants are involved?
      Organics

 8.  Are nonaqueous liquids present?
      Yes, More dense than water.

 9.  What are the aquifer materials?

      Sand

10.  Describe special features of interest.
      Barrier Island setting

11.  What stage in the study/design/implementation process is this site?
     Is extraction in progress?
      Design stage

12.  Dates of ROD or other milestones
                                       IOC

-------
              EVALUATION OF GROUNDWATER EXTRACTION REMEDIES
                      EPA CONTRACT NO.  68-W8-009B
                            GENERAL SITE DATA

                             DATA BASE REPORT
 1. . Site name and location/EPA Region
      WOOD TREATING,  INC., MS     IV

 2.  Program
      RCRA

 3.  Contact person
      NANCY BETHUNE/EPA REGION IV

 4.  Objective of Groundwater Extraction

      Interim objective(s)... Nonaqueous liquid recovery
      Final objective(s)...  Aquifer restoration

 5.  Type of Extraction System and System Enhancements:
      Drilled Wells,  no system enhancements

 6.  Type of Site
      Manufacturing/processing plant

 7.  What type of contaminants are involved?
      Organics

 8.  Are nonaqueous liquids  present?               :
      Yes, More dense than water.

 9.  What are the aquifer materials?

      Sand

10.  Describe special features of interest.
11.  What stage in the study/design/implementation process is this site?
     Is extraction in progress?
      Finalizing corrective action plan.

12.  Dates of ROD or other milestones
                                       109

-------
 6.
              EVALUATION OF GROUNDWATER EXTRACTION  REMEDIES
                      EPA CONTRACT NO.   68-W8-OU9B
                            GENERAL SITE DATA

                             DATA BASE  REPORT
Site name and location/EPA Region
 WURTSMITH AFB, MI     V

Program
 DOD

Contact person
 ENVIRONMENTAL COORDINATOR/WURTSMITH AFB

Objective of Groundwater Extraction

 Interim objective(s)... Plume containment
 Final objective(s)... Aquifer restoration

Type of Extraction System and System Enhancements\
 Drilled Wells, no system enhancements

Type of Site
 UST
 7.   What type of contaminants are involved?
      Low sorption, Organics

 8.   Are nonaqueous liquids present?
      No

 9.   What are the aquifer materials?

      Sand  Gravel

10.   Describe special features of interest.
11.  What stage in the study/design/implementation process is this  site?
     Is extraction in progress?
      Extraction began in 1981
12.  Dates of ROD or other milestones
                                       110

-------
              EVALUATION OF GROUNDWATER EXTRACTION REMEDIES
                      EPA CONTRACT NO.  68-W8-009B
                            GENERAL SITE DATA

                             DATA BASE REPORT
 1.  Site name and location/EPA Region
      WYCKOFF EAGLE HARBOR, WA     X

 2.  Program
      Superfund

 3.  Contact person
      DAVID TETTA, RENE FUENTES/EPA REGION X

 4.  Objective of Groundwater Extraction

      Interim objective(s)... Plume containment, & AQUIFER RES
      Final objective(s)... Nonaqueous liquid recovery

 5.  Type of Extraction System and System Enhancements;
      Drilled Wells, Pulsed Pumping

 6.  Type of Site
      Manufacturing/processing plant

 7.  What type of contaminants are involved?
      Organics

 8.  Are nonaqueous liquids present?
      Yes, Some more dense than water and some less dense than water.

 9.  What are the aquifer materials?

      Clay  Silt  Sand

10.  Describe special features of interest.
      Site adjacent to Puget Sound where tidal fluctuations can be greater
      than 12 feet.

11-  What stage in the study/design/implementation process is this site?
     Is extraction in progress?
      ERA (expedited response action); extraction in progress for floating
      oils;  extraction for water planned for summer 1989, waiting for
      treatment plant design and construction

12.  Dates of ROD or other milestones
                                      111

-------
             EVALUATION OF GROUNDWATER EXTRACTION REMEDIES
                      EPA CONTRACT NO.   68-W8-OU9B
                            GENERAL SITE DATA

                             DATA BASE REPORT
1.  Site name and. location/EPA Region
     ZELLWOOD, FL     IV

2.  Program
     Superfund

3.  Contact person
     KAY CLEGHORN/EPA REGION IV

4.  Objective of Groundwater Extraction

     Interim objective(s)	 Unknown
     Final objective(s)...  Aquifer restoration

5.  Type of Extraction System and System Enhancements;
     Drilled Wells,  no system enhancements

 6.  Type of Site
     Manufacturing/processing plant, HAZ WASTE DUMP

7.  What type  of contaminants are involved?
     High  and Low sorption, Organics and Metals

 8.  Are nonaqueous liquids present?
     Yes,  Some more dense than water and some less dense than water.

 9.  What are  the aquifer materials?

      Silt   Sand

10.  Describe  special features of interest.
11.  What stage in the study/design/implementation process  is this site?
     Is extraction in progress?
      Study stage — pump and treat being  re-evaluated

12.  Dates of ROD or other milestones
                                        112
         
-------