This document is a summary of short-term actions (removals) undertaken by the U.S. Environmental
Protection Agency and the U.S. Coast Guard in response to hazardous substance incidents. This
document presents a historical perspective of the program, summarizing short-term actions completed
during the five-year authorized funding period of the Comprehensive Environmental Response,
Compensation and Liability Act (CERCLA), December 11,1980, through September 30,1985andthose
actions taken during October 1,1985 through September 30,1986 that were funded primarily by two
special appropriations from Congress. This Superfund Emergency Response Actions summary is the first
document to be published aggregating short-term response information for all six years. As the
Superfund removal program continues, EPA intends to publish annual updates of this document.
J. Winston Porter
Assistant Administrator
Office of Solid Waste and Emergency Response
-------
THE SUPERFUND REMOVAL
PROGRAM
In response to increasing national hazardous
waste disposal problems, in 1980 Congress
passed the Comprehensive Environmental
Response, Compensation, and Liability Act
(CERCLA), commonly known as Superfund.
Superfund authorizes the Federal
Government to work with State and local
governments and private parties to provide
responses to accidental releases of
hazardous substances and to inactive
hazardous waste sites.
Superfund cleanups were financed by a $1.6
billion trust fund collected overthe first five-
year period of the program. The fund was
collected through taxes paid by manufac-
turers, producers, and exporters and
importers of oil and designated chemical
substances. It can be used to provide both
short-term actions and long-term cleanup,
with the latter generally undertaken only at
inactive waste sites listed on the National
Priorities List (NPL). Short-term actions,
including emergency responses, occur in
response to hazardous substance releases
both at sites on the NPL and sites that are not
on the NPL (non-NPL sites). In addition, short
term actions conducted during the sixth year
of the program were funded through special
Congressional appropriations. These
appropriations were made so that the program
could continue activities during its sixth year
while Congress reauthorized the law.
The National Contingency Plan (NCP) details
the responsibilities of 14 Federal agencies
and State and local governments for cleaning
up releases of hazardous substances and oil
spills to all media: land, air, surface water, and
groundwater. The lead responsibility for other
emergencies occurring inland or in inland
waters belongs to the U.S. Environmental
Protection Agency (EPA). Primary
responsibility for addressing accidental re-
leases in or near coastal waters and the Great
Lakes rests with the U.S. Coast Guard
(USCG). Although other Federal agencies,
such as the Federal Emergency Management
Agency and the Agency for Toxic Substances
and Disease Registry, do not lead Fund-
financed actions, they provide assistance as
necessary. In addition, special technical
assistance teams and cleanup contractors
contribute to removal actions.
The Superfund removal program, which
manages the short-term actions and
emergency responses, is characterized by
cbse cooperation among Federal, State, and
local government agencies and between
government and industry. Approximately 90
percent of all removals, including emergency
responses, are conducted by the responsible
party (e.g., generator, transporter, or dis-
poser). Forthe remaining ten percent, EPA
either leads the cleanup, with support and
assistance from industry, the Coast Guard,
other Federal agencies, and State and local
agencies, or assists State and local agencies
in managing the response. EPA maintains a
technical team on call 24 hours a day to
respond to emergencies.
Although emergency responses, whether
undertaken by EPA or USCG, must be flexible
and tailored to the specific needs of each site
or release of hazardous substances, some
types of response activities are common to
many removal actions. Some of these typical
activities are noted below.
Sampling drums, storage tanks, lagoons,
surface water, groundwater, and the
surrounding soil and air
Installing security fencing and providing
other security measures
Removing and disposing of containers
and contaminated debris
Excavating contaminated soils and debris
and restoring the site
Pumping out the contaminated liquids
from overflowing lagoons
Collecting contaminants through drainage
systems or skimming devices.
Other activities might include provision of
alternate water supplies, installation of
decontamination devices, and temporary
evacuation of, and housing for, threatened
individuals.
Potential and actual releases of hazardous
substances are extremely van'able in size,
threat, and location. Superfund is available for
all situations meeting CERCLA and NCP
criteria no matter how large orsmall. Actions
under the removal program can range from
erecting a fence to removing and disposing of
-------
thousands of drums. Some responses can
be completed within several days at a cost of a
few thousand dollars.
A truck accident in Arlington, Wyoming,
resulted in a spill of 100 gallons of 3-1
amitrol, a herbicide that is a known
carcinogen. Surrounding soil was
contaminated and public health was
threatened, since the spill occurred
upstream from Rock Creek, the water
supply for Arlington. The U.S.
Environmental Protection Agency in
Denver, Colorado, immediately initiated
response actions underthe Superfund
authority. EPA constructed an earthen
dam to control runoff, removed the
remaining herbicide, excavated
contaminated soil, and disposed of these
contaminants. EPA then backfilled the
excavated area with clean soil and seeded
the area to restore the site to near on'ginal
conditions. This response action cost
approximately $6,000 to complete.
Abandoned hazardous waste sites or
facilities, by contrast, often present complex
technological problems and cost millions of
dollars.
The six-acre Liquid Disposal, Inc. site, in
Uttea, Michigan, has an incineratorfor
liquid wastes, various industrial liquids and
sludges in two lagoons, numerous
surface and buried tanks, over a thousand
drums and numerous small containers.
This inactive facility, ranked as one of the
nation's priorities for cleanup, is listed on
the National Priorities List and will receive
^-
long-term cleanup efforts under the
Superfund remedial program.
Emergency situations on-site existed
priorto the initiation of remedial action and
necessitated immediate attention. A tank
truck accident occurred while transferring
waste chemicals from the truck into an
incinerator at the facility. The accident
resulted in a release of hydrogen suitide
gas, which killed two workers and injured
seventeen others. Under Superfund
removal authority, EPA entered the
facility, stopped the release, and removed
the bodies. After this incident, the facility
was abandoned. Due to the condition of
the site and type of wastes, several
responses were required to mitigate
threats from a variety of hazardous
situations. Under the removal program,
EPA responded to a release of hazardous
substances from the lagoon that
contaminated soils outside of the facility
and threatened a State park, a quarter of a
mile away. EPA excavated contaminated
soils, lowered the level of the lagoon,
drained and repaired the incinerator pit,
installed a clay barrier to contain runoff,
repaired dikes, and secured tanks of
flammable chemicals.
Due to rising levels in a lagoon, EPA, also
underthe Superfund removal program
authority, drained the lagoon, removed
remaining sludges, and capped the
lagoon. In addition, deteriorating drums
were repackaged in secure containers.
Small containers, 1,600 drums, and
several tanks were removed and
disposedof and the site was restored.
Approximately $3,700,000 was
expended to mitigate threats from this
waste site. Further actions will be
undertaken by the remedial program.
Total Superfund removal completions and
associated costs for the period 12/11/80 to
09/30/86 are as follows:
TOTAL COMPLETIONS
NPL* SITES 122
NON-NPL SITES 4JA
TOTAL 596
TOTAL COSTS
NPL* SITES $43,641,900
NON-NPL SITES $75,950,800
TOTAL*
$119,592,700
National Priorities List (NPL) - List of
nationwide priority hazardous waste
sites requiring comprehensive, long-
term actions under Superfund.
Does not include funds for sites
where removal activities were
ongoing as of 09/30/86.
-------
USER'S GUIDE
This document summarizes short-term,
removal activities completed during the first
six years of the Superfund program and is
intended to provide the public with
information about the program.
EPA intends to update this document at least
annually to continue providing this information
to the public.
Inquiries regarding the information contained
in this document should be referred to the
appropriate EPA Regional office. A list of
contacts and a map delineating the States
within each Region are provided in this report.
Much of the work EPA and the USCG
undertake to respond to releases of
hazardous substances is highly technical.
Definitions of the information provided in the
matrices that follow are presented below.
Key To Historical Superfund
Emergency Response Actions Data
1. REGION: EPA Regions 01,02,03,04,
05,06,07,08,09,10
2. STATE: Standard State abbreviation
3. NAME/LOCATION: Site name and focal
jurisdiction
4. NPLSTATUS: (Y) Yes-on proposed
orfinalNPL when action
started
(N) No-not on
proposed or final NPL
when action started
5. INCIDENT CATEGORY:
Active Production Facility - any operation
which now manufactures, recycles,
handles, stores or transports hazardous
materials or waste as a primary ingredient,
product or by-product, or any location
contaminated due to off-site migration of
hazardous materials or wastes from such
ongoing operations.
Inactive Production Facility - any operation
which formerly manufactured, recycled,
handled, stored or transported hazardous
materials or wastes as a primary
ingredient, product or by-product, or any
location contaminated due to off-site
migration of hazardous materials orwastes
from such former operation.
Active Waste Management Facility- any
ongoing operation or site whose primary
purpose is to handle, exchange, transfer,
store, treat or dispose of hazardous
materials orwastes, orany location
contaminated due to off-s'rte migration of
hazardous materials or wastes from such a
facility or site.
Inactive Waste Management Facility - any
former operation or site whose primary
purpose was to handle, exchange,
transfer, store, treat or dispose of
hazardous materials orwastes, or any
locatbn contaminated due to off-site
migration of hazardous materials orwastes
from such a facility or site.
Midnight Dump - any illegal dumping
of hazardous materials into the air, land or
water, whether accidental or deliberate.
Transportation-Related - any release or
potential release of hazardous
substances during transport.
Other - any release of hazardous
substances that does not conform to any
of the above categories and/or where
sources of contamination are unknown.
6. THREAT CATEGORY:
Air contamination
Direct contact - skin contact, ingestion,
inhalation
Drinking water contamination
Ecological damage
Fire/explosion hazard
Food chain contamination
Groundwater contamination
Soil contamination
Surface water contamination.
-------
7. MITIGATIVE ACTIONS:
Migration control - specific measures used
to control or eliminate contaminants from
migrating off-site
Provision of alternate water supplies
- temporary or permanent
Temporary relocation/evacuation - of
nearby populations
Controlling source of threat
- securing containers: sealing open
containers and putting leaky, corroded
containers of hazardous substances into
new containers
- reducing volume of hazardous
substances in lagoons/containment areas
isolating incompatible substances
covering/capping: containment of
airborne threats, landfills, lagoons,
hazardous materials
extinguishing a fire
bulking materials
solidifying materials
neutralizing materials
collecting and/or retaining contaminants
other (specify).
Excavation - soil, contaminated materials,
containers
Site restoration - backfilling, grading.
seeding, repaving
Treatment/disposal of wastes - all
treatment/disposal done in accordance
with applicable hazardous waste
management regulations.
8. COST: Costs for cleanup contractor
services.
-------
-------
U.S.EPA REGION 1
For Information Contact:
Chief, Oil and Hazardous
Materials Section,
Environmental Services Division
60 Westview Avenue
Lexington, MA 02173
(617) 861-6700
-------
SUPERFUND EMERGENCY RESPONSE ACTIONS
HISTORICAL
|RG|ST| NAME | LOCATION |NPL| INCIDENT
III 1
|01|CT|BOURDEAUDHUI (WILLINGTON
III I
III I
I I I I
III I
|01|CT|KAPINOS SITE (WILLINGTON
III .
I I I
Ml I
Ml I
I I I |
| CATEGORY
N (OTHER
I
I
I
I
N (INACTIVE PRODUCTION FACILITY
I
I
!
I
| THREATS
I
(DIRECT CONTACT
(FOOD CHAIN CONTAMINATION
(SOIL CONTAMINATION
I
I
(DIRECT CONTACT
IGROUNDWATER CONTAMINATION
(SOIL CONTAMINATION
I
I
| MITIGATIVE ACTIONS
I
. (DISPOSAL
(EXCAVATION
(SECURITY
| SAMPLING, ANALYSIS
I
(DISPOSAL
(EXCAVATION
(SECURITY
| SAMPLING, ANALYSIS
I
| COST |
($(000) (
I*
I
I
I
I*
I
I
I
145 1
I
I
I
400 1
I
I
I
1 01 |CT|0' SULLIVAN'S ISLAND DRUM
I
I
I
I
I
(DERBY
I
I
I
I
I
N (INACTIVE WASTE MANAGEMENT FACILITY (DIRECT CONTACT
(AIR CONTAMINATION
(SOIL CONTAMINATION
(ECOLOGICAL DAMAGE
I
I
(DISPOSAL
(ORGANIZED MATERIALS
(EXCAVATION
(SECURITY
| SAMPLING .ANALYSIS
I
|$ 183)
I |
I I
I I
I |
I I
-------
SUPERFUND EMERGENCY RESPONSE ACTIONS
HISTORICAL
|RG|ST| NAME
1 1 1
| LOCATION |NPL|
INCIDENT
CATEGORY
| THREATS | MITIGATIVE ACTIONS | COST |
| | ($(000) |
|01|CT|RYE STREET PESTICIDE SITE
I I I
I I I
I I I
I I I
(EAST WINDSOR N (INACTIVE PRODUCTION FACILITY
(DIRECT CONTACT
(DRINKING WATER CONTAMINATION
(SOIL CONTAMINATION
I
I
(DISPOSAL
(ORGANIZED MATERIALS
(EXCAVATION
|SAMPLING,ANALYSIS
8451
|01|MA|BAIRD & MCGUIRE
(HOLBROOK
I
Y (ACTIVE PRODUCTION FACILITY
(DIRECT CONTACT
(SURFACE WATER CONTAMINATION
(GROUNDWATER CONTAMINATION
(SOIL CONTAMINATION
I
I
(DISPOSAL |S 897|
(CAPPED I
|CONTAMINANT CONTAINMENT/RETENTION)
(MIGRATION CONTROL |
(EXCAVATION
(SECURITY
(RESTORATION
|SAMPLING,ANALYSIS
|01|MA|CANNON ENGINEERING CORP (CEC)
I I I
I I I
I I I
I I I
(PLYMOUTH
I
Y (INACTIVE WASTE MANAGEMENT FACILITY(FIRE/EXPLOSION
| (AIR CONTAMINATION
| (SURFACE WATER CONTAMINATION
j (GROUNDWATER CONTAMINATION
| (SOIL CONTAMINATION
(DISPOSAL
|PUMPED OUT CONTAMINANTS
(EXCAVATION
(SECURITY
(SAMPLING,ANALYSIS
|$ 348|
-------
SUPERFUND EMERGENCY RESPONSE ACTIONS
HISTORICAL
|RG|ST| NAME | LOCATION |NPL| INCIDENT
III 1 || CATEGORY
| 01 |MA (CHARLES GEORGE RECLAMATION LANDFILL |TYNGSBORO
It ,
I I
I I I I
I I I
It 1 ,
II 1
III |
II 1 i
II |
III |
| 01 |MA [DEAN STREET (NORWOOD PCBS) | NORWOOD
It ,
1 1
If ,
1 1
11 1
I.I 1
1 1 1
1 1 1
|01|MA|HOUGELS NECK-CG |QUINCY
II ! i
1 1 1
111
1 1 1
III |
II 1 i
1 1 1
Y | INACTIVE WASTE MANAGEMENT
1
1
1
1
1
1
1
N*| INACTIVE WASTE MANAGEMENT
1
1
1
1
1
N IMIDNIGHT DUMP
1
1
1
1
| THREATS
1
FACILITY|DIRECT CONTACT
IFIRE/EXPLOSION
[DRINKING WATER CONTAMINATION
|AIR CONTAMINATION
[SURFACE WATER CONTAMINATION
IGROUNDWATER CONTAMINATION
[SOIL CONTAMINATION
1
FACILITY|DIRECT CONTACT
|SOIL CONTAMINATION
1
1
1
1
[DIRECT CONTACT
[SOIL CONTAMINATION
1
1
1
| MITIGATIVE ACTIONS
1
| CAPPED
[MIGRATION CONTROL
[WATER SUPPLIED
[SECURITY
|SAMPLING,ANALYSIS
1
1
1
[DISPOSAL
[EXCAVATION
[SECURITY
[RESTORATION
[SAMPLING.ANALYSIS
1
[DISPOSAL
| COST |
|$(000)|
|$ 600 |
1 |
1 |
1 1
1 I
1 1
I |
1 1
|$ 161 |
1 1
1 1
I |
1 |
1 1
|$ 51
[CONTAMINANT CONTAINMENT/RETENTION | |
| SECURITY
|SAMPLING,ANALYSIS
1
1 |
1 1
1 1
NOTE: NON-NPL SITE AT INITIATION OF REMOVAL. HOWEVER, CURRENTLY ON PROPOSED OR FINAL NPL.
-------
SUPERFUND EMERGENCY RESPONSE ACTIONS
HISTORICAL
RG|ST| NAME
1 1
01|MA|INDUSTRI-PLEX
I I
I I
III
01 | MA | I RON HORSE PARK
I I I
I I
I I
I I
I I
I I
I I
I I
|01|MA|MIDN1GHT DUMP
I I
I I
I I
I I
I I
LOCATION
UOBURN
BILLERICA
DIGHTON
I
I
NPL
Y
Y
H
I
INCIDENT | THREATS | MITIGATIVE ACTIONS
CATEGORY | I
ACTIVE PRODUCTION FACILITY (DIRECT CONTACT (SECURITY
IGROUNDWATER CONTAMINATION |
| SOIL CONTAMINATION |
I I
INACTIVE WASTE MANAGEMENT FACILITY [DIRECT CONTACT (DISPOSAL
|AIR CONTAMINATION (ORGANIZED MATERIALS
(SOIL CONTAMINATION (CAPPED
(MIGRATION CONTROL
(EXCAVATION
(SECURITY
(RESTORATION
| SAMPLING, ANALYSIS
I
MIDNIGHT DUMP (DIRECT CONTACT (DISPOSAL
(FIRE/EXPLOSION (CONTAMINANT CONTAINMENT/RETENTION
(SOIL CONTAMINATION (REPACKED DRUMS
(MIGRATION CONTROL
| (SAMPLING.ANALYSIS
I I
COST |
$(000) |
$ 28 1
I
$ 1048]
|$ 4|
I
I
-------
SUPERFUND EMERGENCY RESPONSE ACTIONS
HISTORICAL
|RG|ST| NAME LOCATION
|01|ME|PINETTE'S SALVAGE YARD [WASHBURN
I
I
I
|01|ME|SACO TANNERY WASTE PITS JSACO
|01|HE|UN!ON CHEMICAL CO., INC. (SOUTH HOPE
1
1
1
1
1
1
|NPL| INCIDENT THREATS | MITIGATIVE ACTIONS COST
1 1 CATEGORY | |$(000)
Y IACTIVE WASTE MANAGEMENT FACILITY [DIRECT CONTACT [DISPOSAL |$ 400
[SOIL CONTAMINATION [CONTAMINANT CONTAINMENT/RETENTION]
(EXCAVATION
[RESTORATION
[SAMPLING, ANALYSIS
1
Y [INACTIVE WASTE MANAGEMENT FACILITY|GROUNDWATER CONTAMINATION [DISPOSAL |$ 98|
ISOIL CONTAMINATION [NEUTRALIZED MATERIALS
| PUMPED OUT CONTAMINANTS
[CAPPED
[MIGRATION CONTROL
(SECURITY
[RESTORATION
[SAMPLING.ANALYSIS
1
N*|MIDNIGHT DUMP (FIRE/EXPLOSION [DISPOSAL |$ 1369|
[SOIL CONTAMINATION [ORGANIZED MATERIALS | |
[SOLIDIFIED MATERIALS |
[SECURITY |
[RESTORATION | |
ISAMPLING.ANALYSIS |
I I I
NOTE: HON-NPL SITE AT INITIATION Of REMOVAL. HOWEVER, CURRENTLY OH PROPOSED OR FINAL NPL.
-------
SUPERFUND EMERGENCY RESPONSE ACTIONS
HISTORICAL
|RG|ST| NAME
1 1 1
|01|MA|NEU BEDFORD SITE-CG
I I I
I I I
I I I
I I I
|01|HA|SILRESIM CHEMICAL CORP.
I I I
I I I
I I I
I I I
| 01 | ME | GREAT DIAMOND ISLAND-CG
I I I
I I I
I I I
|01|ME|KESUICK ROAD-CG
I I I
ill
I I I
| LOCATION |NPL| INCIDENT
| | | CATEGORY
| NEW BEDFORD
I
I
I
I
| LOWELL
I
I
I
I
| PORTLAND
I
I
I
| PORT LAND
I
I
I
Y [ACTIVE PRODUCTION FACILITY
I
I
I
I
Y [INACTIVE WASTE MANAGEMENT
I
I
I
I
N (MIDNIGHT DUMP
I
I
I
N (MIDNIGHT DUMP
I
I
I
| THREATS
| MITIGATIVE ACTIONS
| COST |
| | |$(000)|
(DIRECT CONTACT
(FOOD CHAIN CONTAMINATION
(SURFACE WATER CONTAMINATION
(ECOLOGICAL DAMAGE
I
FACILITY | SURFACE WATER CONTAMINATION
(GROUNDWATER CONTAMINATION
(SOIL CONTAMINATION
I
I
(DIRECT CONTACT
(AIR CONTAMINATION
(SURFACE WATER CONTAMINATION
I
(DIRECT CONTACT
(SOIL CONTAMINATION
I
I
(SECURITY
(SAMPLING, ANALYSIS
I
I
I
I*'
I
I
I
I
(CONTAMINANT CONTAINMENT/RETENTION |$
(MIGRATION CONTROL
(SECURITY
| SAMPLING, ANALYSIS
I
(DISPOSAL
(REPACKED DRUMS
(SAMPLING, ANALYSIS
I
(DISPOSAL
(REPACKED DRUMS
| SAMPLING, ANALYSIS
I
I
I
I
I
|$
I
I
I
|$
I
I
I
76 1
I
I
I
I
67|
I
I
I
I
11
I
I
I
1|
1
1
1
-------
SUPERFUND EMERGENCY RESPONSE ACTIONS
HISTORICAL
|RG|ST| NAME | LOCATION
Ml 1
| 01 |NH| BURNS HILL ROAD [HUDSON
I I I I
Ml I
III I
III I
|01|NH|BURSEY ASBESTOS | HUDSON
III I
III I
|01|NH|GONIC SITES (GONIC
III - I
iii r
Ml I
i i r i
Ml I
|01|NH| JOHNS MANVILLE ASBESTOS SITE (HUDSON
M I |
Ml I
III I
Ml I
Ml !
NPL| INCIDENT
| CATEGORY
N [MIDNIGHT DUMP
I
I
I
I
N [INACTIVE WASTE MANAGEMENT
I
I
N (INACTIVE WASTE" MANAGEMENT
I
I
I
I
i
N (INACTIVE WASTE MANAGEMENT
I
I
I
I
I
| THREATS
. I
[DIRECT CONTACT
[FIRE/EXPLOSION
(SOIL CONTAMINATION
| GROUNDWATER CONTAM I NAT I ON
I
FACILITY (DIRECT CONTACT
I
I
FACILITY (DIRECT CONTACT
(FIRE/EXPLOSION
I
I
I
I
FACILITY|AIR CONTAMINATION
[SURFACE WATER CONTAMINATION
I
I
I
I
| MITIGATIVE ACTIONS ( COST |
| | $(000) |
(ORGANIZED MATERIALS |$ 110|
[REPACKED DRUMS | |
[SECURITY | |
(STORAGE | |
I I I
[MIGRATION CONTROL |$ 22 1
[RESTORATION | |
I I I
[DISPOSAL |$ 150 |
[REPACKED DRUMS |
(ORGANIZED MATERIALS |
[SECURITY |
| SAMPLING, ANALYSIS |
I I
(CAPPED $ 864 |
(MIGRATION CONTROL |
(RELOCATION/EVACUATION |
(RESTORATION |
| SAMPLING, ANALYSIS |
I I
-------
SUPERFUND EMERGENCY RESPONSE ACTIONS
HISTORICAL
|RG[ST| NAME | LOCATION
III 1
|01|NH|MATARAZZO [HUDSON
M I I
Ml I
|01|NH|MOTTOLO PIG FARM [RAYMOND
III I
III I
Ml I
III I
III I
I I I I
|01|NH|OTTATI & GOSS/KINGSTON STEEL DRUM [KINGSTON
Ml I
Ml I
Ml I
I I I I
III I
It 1 1
II 1
iNPL| INCIDENT | THREATS
| CATEGORY |
N [INACTIVE WASTE MANAGEMENT FACILITY|DIRECT CONTACT
1 1
1 1
N*|INACTIVE WASTE MANAGEMENT FACILITY|DIRECT CONTACT
1 (DRINKING WATER CONTAMINATION
1 [SURFACE WATER CONTAMINATION
1 [GROUNDWATER CONTAMINATION
1 [SOIL CONTAMINATION
1 1
1 1
Y [INACTIVE WASTE MANAGEMENT FACILITY [FIRE/EXPLOSION
1 [DRINKING WATER CONTAMINATION
1 [DIRECT CONTACT
1 [SURFACE WATER CONTAMINATION
1 (GROUNDWATER CONTAMINATION
1 [SOIL CONTAMINATION
1 1
| MITIGATIVE ACTIONS
1
[MIGRATION CONTROL
[RESTORATION
1
[DISPOSAL
[REPACKED DRUMS
[ORGANIZED MATERIALS
(EXCAVATION
[SECURITY
[SAMPLING, ANALYSIS
1
[DISPOSAL
[CAPPED
(SOLIDIFIED MATERIALS
(EXCAVATION
[SECURITY
[SAMPLING.ANALYSIS
1
| COST |
[$(000) |
|$ 10|
I I
I I
|$ 509 |
I I
I I
I I
I I
I I
I I
|$ 1563 |
I |
I I
I I
I I
I I
I I
* NOTE: NON-NPL SITE AT INITIATION OF REMOVAL. HOWEVER, CURRENTLY ON PROPOSED OR FINAL NPL.
-------
SUPERFUND EMERGENCY RESPONSE ACTIONS
HISTORICAL
|RG|ST| NAME | LOCATION |NPL| INCIDENT | THREATS | MITIGATIVE ACTIONS
III | | CATEGORY | |
|01|NH|KEEFE ENVIRONMENTAL SERVICES (EPPING
|01|NH|LAKE SUNAPEE |SUNAPEE
III I
III I
III I
| 01 | NH | LOWELL ROAD (HUDSON
1 1 1 1
III 1
III 1
III 1
III 1
III 1
1 1 1
III 1
| COST |
($(000) |
Y (INACTIVE WASTE MANAGEMENT FACILITY|FIRE/EXPLOSION (DISPOSAL |$ 715|
[AIR CONTAMINATION (CONTAMINANT CONTAINMENT/RETENTION |
(DRINKING WATER CONTAMINATION (REPACKED DRUMS |
(SURFACE WATER CONTAMINATION (PUMPED OUT CONTAMINANTS |
(GROUNDWATER CONTAMINATION (MIGRATION CONTROL |
(SOIL CONTAMINATION (SECURITY |
| (SAMPLING, ANALYSIS |
1 1 1
N (MIDNIGHT DUMP (DIRECT CONTACT (DISPOSAL
| (DRINKING WATER CONTAMINATION (ORGANIZED MATERIALS
| (SURFACE WATER CONTAMINATION |SAMPLING,ANALYSIS
1 1 1
|$ 32|
I
- I
I
N (INACTIVE WASTE MANAGEMENT FACILITY|AIR CONTAMINATION (DISPOSAL |$ 418
(CONTAMINANT CONTAINMENT/RETENTION |
(MIGRATION CONTROL |
(EXCAVATION |
(RELOCATION/EVACUATION |
(SECURITY |
(RESTORATION |
(SAMPLING, ANALYSIS |
I I
-------
SUPERFUND EMERGENCY RESPONSE ACTIONS
HISTORICAL
|RG|ST| NAME
1 1 1
| 01 |NH| SHADY LANE ASBESTOS
I I I
I I I
I I I
I I I
I I I
| 01 | NH | SYLVESTER
I I I
I I I
I I I
I I i
|01|NH|TINKHAM GARAGE
I I I
I I I
I I I
I I I
| LOCATION |NPL| INCIDENT | THREATS
| || CATEGORY |
[HUDSON
I
I
I
I
I
| NASHUA
I
I
I
I
[LONDONDERRY
I
I
I
I
N [INACTIVE WASTE MANAGEMENT FACILITY|DIRECT CONTACT
| [AIR CONTAMINATION
| [SURFACE WATER CONTAMINATION
I I
I I
I I
Y [INACTIVE WASTE MANAGEMENT FACILITY [AIR CONTAMINATION
| [SURFACE WATER CONTAMINATION
| IGROUNDWATER CONTAMINATION
| [SOIL CONTAMINATION
I I
Y JOTHER (DRINKING WATER CONTAMINATION
| [SURFACE WATER CONTAMINATION
| IGROUNDWATER CONTAMINATION
| |SOIL CONTAMINATION
I I
| MITIGATIVE ACTIONS
I
| DISPOSAL
| COST |
($(000) |
|$ 655|
[CONTAMINANT CONTAINMENT/RETENTION] |
[MIGRATION CONTROL
| RELOCAT ION/EVACUAT I ON
[SAMPLING, ANALYSIS
I
[DISPOSAL
[MIGRATION CONTROL
[SAMPLING, ANALYSIS
I
I
(SAMPLING, ANALYSIS
I
I
I
I
I I
I I
I I
I I
|$ 675|
I I
I I
I I
I I
|$ 135|
I I
I I
I I
I I
-------
SUPERFUND EMERGENCY RESPONSE ACTIONS
HISTORICAL
|RG|ST| NAME | LOCATION (NPL| INCIDENT
1 1 1
|oi |NH|POINTER ASBESTOS (HUDSON
I I I I
III I
| 01 | NH | RIDGE AVE ASBESTOS , (HUDSON
I I I
II!
I I I
! I I
I I I
I I I
I I I
I I I
|01|NH|SAVAGE MUNICIPAL WATER SUPPLY (MILFORD
III I
III I
III I
| CATEGORY
N | INACTIVE WASTE MANAGEMENT
I
I
N (INACTIVE WASTE MANAGEMENT
I
I
I
I
I
I
I
I
N* | OTHER
I
I
I
( THREATS
I
FACILITY (DIRECT CONTACT
I
I
FACILITY (DIRECT CONTACT
(AIR CONTAMINATION
(SURFACE WATER CONTAMINATION
I
I
I
I
I
I
(DRINKING WATER CONTAMINATION
(DIRECT CONTACT
(GROUNDWATER CONTAMINATION
I
| MITIGATIVE ACTIONS
I
(MIGRATION CONTROL
(RESTORATION
I
(DISPOSAL
(CAPPED
| COST |
($(000) |
|$ 4|
I I
I I
|$ 104 |
I I
(CONTAMINANT CONTAINMENT/RETENTION] |
(MIGRATION CONTROL
(RELOCATION/EVACUATION
(SECURITY
(RESTORATION
|SAMPLING,ANALYSIS
I
| WATER SUPPLIED
| SAMPLING, ANALYSIS
I
I
I I
I I
I I
I I
I I
I I
($ 10|
1 1
1 1
1 1
* NOTE: NON-NPL SITE AT INITIATION OF REMOVAL. HOWEVER, CURRENTLY ON PROPOSED OR FINAL NPL.
-------
SUPERFUND EMERGENCY RESPONSE ACTIONS
HISTORICAL
|RG|ST| NAME | LOCATION |NPL| INCIDENT
Ml | || CATEGORY
|01|RI|CASTLE HILL-CG (NEWPORT | N [MIDNIGHT DUMP
Mi I II
Ml I ||
|01|RI (COOKS LANDFILL |EAST PROVIDENCE] N (INACTIVE WASTE MANAGEMENT
Ml I
III I
I I I I
I I I I
Ml I
III I
|01|RI (DAVIS LIQUID WASTE |SMITHFIELD
Ml I
III I
III I
III I
|01|RI|PICILLO FARM [COVENTRY
I I I I
I I I I
I I I I
M I I
Ml I
Ml I
I
I
I
I
I
I
Y (INACTIVE WASTE MANAGEMENT
I
I
I
I
Y (INACTIVE WASTE MANAGEMENT
i
I
I
I
I
I
| THREATS
I
(DIRECT CONTACT
(AIR CONTAMINATION
I
FACILITY (DIRECT CONTACT
(FIRE/EXPLOSION
(DRINKING WATER CONTAMINATION
(AIR CONTAMINATION
(SURFACE WATER CONTAMINATION
(SOIL CONTAMINATION
I
FACILITY [DIRECT CONTACT
IFIRE/EXPLOSION
(DRINKING WATER CONTAMINATION
I
I
FACILITY [DIRECT CONTACT
IFIRE/EXPLOSION
[AIR CONTAMINATION
[SURFACE WATER CONTAMINATION
[GROUNDWATER CONTAMINATION
[SOIL CONTAMINATION
I
| MITIGATIVE ACTIONS | COST |
| |$(000)|
(DISPOSAL |$ 1|
(SAMPLING, ANALYSIS | |
I I I
[DISPOSAL |$ 120|
(ORGANIZED MATERIALS |
[EXCAVATION |
(SECURITY |
(RESTORATION ; |
(SAMPLING, ANALYSIS |
1 1
(DISPOSAL |$ 230 |
(REPACKED DRUMS | |
(ORGANIZED MATERIALS | |
(SAMPLING, ANALYSIS | |
1 1 1
(DISPOSAL |$ 1127|
[ORGANIZED MATERIALS |
[EXCAVATION |
[SECURITY |
[RESTORATION | |
| SAMPLING, ANALYSIS |
I I I
-------
SUPERFUND EMERGENCY RESPONSE ACTIONS
HISTORICAL
|RG|ST| NAME
1 1 I
|01|RI|STAMINA MILLS, INC.
I ! I
I I I
I I I
(01 |RI (WESTERN SAND & GRAVEL
I I
I I
I I
I I
I I
I I
|01|VT|CYANIDE INCIDENT
I I I
I I I
I I I
|01|VT|PINE STREET CANAL
I I I
I I I
I I I
I I I
I I I
I I I
I I I
I I I
| LOCATION |NPL| INCIDENT | THREATS
| | CATEGORY j
|N. SMITHFIELD
I
I
I
IBURRILLVILLE
I
I
I
I
I
I
IVERGENNES
I
I
I
(BURLINGTON
I
I
I
I
I
I
I
I
Y [INACTIVE PRODUCTION FACILITY (DRINKING WATER CONTAMINATION
| JGROUNDWATER CONTAMINATION
I
!
N*| INACTIVE WASTE MANAGEMENT FACILITY (SURFACE WATER CONTAMINATION
| JGROUNDWATER CONTAMINATION
| | DRINKING WATER CONTAMINATION
I I
I I
I I
I I
N (ACTIVE PRODUCTION FACILITY (DIRECT CONTACT
(AIR CONTAMINATION
I
I
Y INACTIVE PRODUCTION FACILITY (DIRECT CONTACT
(FIRE/EXPLOSION
(DRINKING WATER CONTAMINATION
(SURFACE WATER CONTAMINATION
I
I
I
I
I
| MITIGATIVE ACTIONS
I
(WATER SUPPLIED
(RESTORATION
|SAMPLING,ANALYSIS
I
(DISPOSAL
(PUMPED OUT CONTAMINANTS
(SOLIDIFIED MATERIALS
(MIGRATION CONTROL
(WATER SUPPLIED
(SAMPLING, ANALYSIS
I
(DISPOSAL
(REPACKED DRUMS
| SAMPLING, ANALYSIS
I
(DISPOSAL
(ORGANIZED MATERIALS
(SOLIDIFIED MATERIALS
| COST |
($(000) |
|$ 309|
I I
I
I
|$ 31 1
I I
I I
I I
I I
I I
I
IS 2|
I
I I
I
|$ 815
I
I
| CONTAM I NANT CONTA I NMENT/RETENT ION |
(MIGRATION CONTROL
(EXCAVATION
(SECURITY
(SAMPLIHG.ANALYSIS
I
I
I
I
I
I
MOTE: H0M-HPL SITE AT INITIATION OF REKOVAL. HOWEVER, CURREHRY OH PROPOSED OR FtHAl MPL.
-------
U. S. EPA REGION 2
ALSO: PR
VI
For Information Contact:
Chief, Response and Prevention
Branch, Emergency and Remedial
Response Division
Woodbridge Avenue
Raritan Depot-Bldg. 209
Edison, NJ 08S37
(201) 321-6657
-------
SUPERFUND EMERGENCY RESPONSE ACTIONS
HISTORICAL
|RG|ST| NAME
1 1 1
| LOCATION |NPL|
1 1 1
INCIDENT
CATEGORY
| THREATS | MITIGATIVE ACTIONS | COST |
| | ($(000) |
|02|NJ|BEACH CONTAMINATION-CG
I I I
I I I
(LONG BRANCH | N (MIDNIGHT DUMP
I I I
I I I
I I I
(DIRECT CONTACT
(SURFACE WATER CONTAMINATION
(SOIL CONTAMINATION
I
|SAMPLING,ANALYSIS
I
1
|$ 1|
I I
|02(NJ|BLUE POLY DRUM-CG
I I I
I I I
(GLOUCESTER CITY| N (MIDNIGHT DUMP
I
I
I
(DIRECT CONTACT
(SOIL CONTAMINATION
(DISPOSAL
(REPACKED DRUMS
(SOLIDIFIED MATERIALS
(SAMPLING.ANALYSIS
|$
|02|NJ(BLUE SPRUCE INTERNATIONAL
I I I
I I I
I I I
I I I
I I I
(02 | NJ | BRADY METALS
I I I
I I I
I I I
I I I
I I I
I I I
(BOUND BROOK
I
I
I
I
I
(NEWARK
I
I
I
I
I
I
N (INACTIVE PRODUCTION FACILITY
I
I
I
I
I
N (OTHER
I
I
I
I
I
I
(DIRECT CONTACT
(SOIL CONTAMINATION
I
I
I
I
(DIRECT CONTACT
(SOIL CONTAMINATION
I
I
I
I
I
(DISPOSAL
(ORGANIZED MATERIALS
(MIGRATION CONTROL
(SECURITY
(SAMPLING, ANALYSIS
I
|$
I
I
I
I
I
(CONTAMINANT CONTAINMENT/RETENTION |$
(MIGRATION CONTROL
(EXCAVATION
(SECURITY
(RESTORATION
(STORAGE
I
I
I
I
I
I
I
3|
I
I
I
I
293 1
-------
SUPERFUND EMERGENCY RESPONSE ACTIONS
HISTORICAL
|RG|ST| NAME
1 1 1
| LOCATION |NPL|
1 1 1
INCIDENT
CATEGORY
| THREATS | MITIGATIVE ACTIONS | COST |
| | |$(000)|
|02|NJ|BRIDGEPORT RENTAL & OIL SERVICES (BRIDGEPORT
Y (INACTIVE WASTE MANAGEMENT FACILITY|DIRECT CONTACT
(DISPOSAL
|$ 106|
III I
III' I
III I
III I
I I I I
I I I I
III I
I I I I
III I
|02|NJ|BURNT FLY BOG (MARLBORO TUP.
I I I
I I I
I I I
II I
I I I
(02 |NJ (CHEMICAL CONTROL (ELIZABETH
I I I I
III I
I I I I
I I I I
III I
| (DRINKING WATER CONTAMINATION
| (SURFACE WATER CONTAMINATION
| (ECOLOGICAL DAMAGE
| | GROUNDWATER CONTAMINATION '
| (SOIL CONTAMINATION
I I
I
I
I
Y (MIDNIGHT DUMP (DIRECT CONTACT
Y
(SURFACE WATER CONTAMINATION
(GROUNDWATER CONTAMINATION
(SOIL CONTAMINATION
I
I
INACTIVE WASTE MANAGEMENT FACILITY (FIRE/EXPLOSION
| AIR CONTAMINATION
(DRINKING WATER CONTAMINATION
I
I
I
(PUMPED OUT CONTAMINANTS
(ORGANIZED MATERIALS
I I
I I
(CONTAMINANT CONTAINMENT/RETENTION | |
(MIGRATION CONTROL
(WATER SUPPLIED
(SECURITY
(RESTORATION
| SAMPLING, ANALYSIS
I
(DISPOSAL
(MIGRATION CONTROL
(SECURITY
(RESTORATION
| SAMPLING, ANALYSIS
I
(ORGANIZED MATERIALS
(REPACKED DRUMS
(MIGRATION CONTROL
(SECURITY
(STORAGE
I
I I
I I
I I
I I
I I
I I
(3 29|
I I
I I
I I
I I
I I
|$ 13|
I I
I I
I I
I I
I I
-------
SUPERFUND EMERGENCY RESPONSE ACTIONS
HISTORICAL
|RG|ST| NAME | LOCATION |NPL|
III 1 1
|02|NJ|DELANCY TRAILER | NEWARK
III 1
III 1
III !
Ill 1
III 1
|02|NJ|DUANE MARINE (PERTH AMBOY
III 1
III 1
III 1
III 1
III 1
|02|NJ (FRIED INDUSTRIES |E. BRUNSWICK
III 1
III 1
III 1
N (MIDNIGHT
N (INACTIVE
1
1
1
Y (INACTIVE
INCIDENT | THREATS
CATEGORY |
DUMP (DIRECT CONTACT
IFIRE/EXPLOSION
1
1
1
1
WASTE MANAGEMENT FACILITY|DIRECT CONTACT
(FIRE/EXPLOSION
1
1
1
1
PRODUCTION FACILITY (DIRECT CONTACT
(DRINKING WATER CONTAMINATION
(GROUNDWATER CONTAMINATION
1
( MITIGATIVE ACTIONS
1
[DISPOSAL
(REPACKED DRUMS
(ORGANIZED MATERIALS
(SECURITY
(SAMPLING, ANALYSIS
1
(DISPOSAL
| COST |
|$(000)|
|$ 94|
1 1
1 1
1 1
1 1
1 1
|$ 40 1
(CONTAMINANT CONTAINMENT/RETENTION | (
(MIGRATION CONTROL
(EXCAVATION
(SAMPLING, ANALYSIS
1
(SAMPLING.ANALYSIS
(PUMPED OUT CONTAMINANTS
1
1
1 1
1 1
1 1
1 1
|$ 0|
1 1
1 1
1 1
-------
SUPERFUND EMERGENCY RESPONSE ACTIONS
HISTORICAL
|RG|ST| NAME | LOCATION |NPL| INCIDENT
III | || CATEGORY
| THREATS | MITIGATIVE ACTIONS | COST |
| | |$(000)|
|02|NJ|GEMS LANDFILL (GLOUCESTER TWP
1 1
1 1
1 1
1 1
1 1
1 1
|02|NJ|GOOSE FARM (PLUMSTEAD TWP.
1
1
1
1
1
| 02 | N J | HAYES PARK POOL | NEWARK
1 1
1 1
1
1 1
1
Y (INACTIVE WASTE MANAGEMENT
1
1
1
1
1
1
N* (MIDNIGHT DUMP
1
1
1
1
N (OTHER
FACILITY|DIRECT CONTACT
(AIR CONTAMINATION
(FIRE/EXPLOSION
(GROUNDWATER CONTAMINATION
(SURFACE WATER CONTAMINATION
(SOIL CONTAMINATION
1
(AIR CONTAMINATION
(SURFACE WATER CONTAMINATION
f GROUNDWATER CONTAMINATION
1
1
1
(DIRECT CONTACT
(SOIL CONTAMINATION
1
1
1
1
(CONTAMINANT CONTAINMENT/RETENTION |$ 203
(MIGRATION CONTROL
(SECURITY
(SAMPLING, ANALYSIS
1
1
1
(DISPOSAL
(BULKED MATERIALS
1
1
1
1
1
1
|$ 1509
I
| CONTAM I NANT CONTAI NMENT/RETENT I ON |
(MIGRATION CONTROL
(EXCAVATION
1
(DISPOSAL
(REPACKED DRUMS
(EXCAVATION
(SECURITY
(RESTORATION
1
I
I
I
|$ 54 1
I I
I I
I I
I I
I
NOTE: NON-NPL SITE AT INITIATION OF REMOVAL. HOWEVER, CURRENTLY ON PROPOSED OR FINAL NPL.
-------
SUPERFUND EMERGENCY RESPONSE ACTIONS
HISTORICAL
|RG|ST| NAME | LOCATION |NPL| INCIDENT | THREATS
III | || CATEGORY |
| 02 |NJ| HORSESHOE ROAD DUMP (SAYREVILLE | N (MIDNIGHT DUMP [DIRECT CONTACT
1 1 'I III 1
1 1 ! Ill I
Ml III 1
Ml | || I
|02|NJ|KEARNY DRUM DUMP #1 & #5 (KEARNY | N |MIDNIGHT DUMP (DIRECT CONTACT
III | || (SURFACE WATER CONTAMINATION
Ml III I
Ml I || |
Ml III I
|02|NJ|KEARNY DRUM DUMP #2 |KEARNY | N (MIDNIGHT DUMP (DIRECT CONTACT
III | || [SURFACE WATER CONTAMINATION
III | || (SOIL CONTAMINATION
Ml I || |
I II I || I
Ml III I
Ml III I
| HITIGATIVE ACTIONS
I
(DISPOSAL
(ORGANIZED MATERIALS
(SECURITY
| SAMPLING, ANALYSIS
I
(DISPOSAL
(ORGANIZED MATERIALS
(EXCAVATION
(SAMPLING, ANALYSIS
I
(DISPOSAL
(REPACKED DRUMS
(ORGANIZED MATERIALS
(EXCAVATION
(SECURITY
| SAMPLING, ANALYSIS
I
| COST |
|$(000)|
|$ 60|
I I
I I
I I
I I
|$ 97|
I I
I I
I I
I I
|$ 42 1
I
I
I
I
I
I
-------
SUPERFUND EMERGENCY RESPONSE ACTIONS
HISTORICAL
|RG|ST| NAME
1 1 1
|02|NJ|KIN-BUC LANDFILL
1 1 1
1 1 1
1 1 1
|02|NJ|LIPARI LANDFILL
1 ! I
1 1 1
1 1 1
1 1 1
1 1 1
|02|NJ|LOCKUOOD STREET
1 1 1
1 1 1
1 I 1
1 1 1
1 1 1
| LOCATION |NPL| INCIDENT
| | | CATEGORY
IEDISON TOWNSHIP) Y (INACTIVE WASTE MANAGEMENT
I
1
1
| PITMAN
|
|
|
|
1
(NEWARK
I
|
I
1
1
1
1
1
Y (INACTIVE WASTE MANAGEMENT
1
1
1
1
1
N (OTHER
1
1
1
1
1
| THREATS
1
FACILITY|SURFACE WATER CONTAMINATION
(ECOLOGICAL DAMAGE
1
1
FACILITY (DIRECT CONTACT
(DRINKING WATER CONTAMINATION
(SURFACE WATER CONTAMINATION
(SOIL CONTAMINATION
(ECOLOGICAL DAMAGE
1
(DIRECT CONTACT
(SOIL CONTAMINATION
i
1
1
1
| MITIGATIVE ACTIONS | COST |
| |$COOO)(
(DISPOSAL |$ 1849|
(CONTAMINANT CONTAINMENT/RETENTION | (
| SAMPLING .ANALYSIS | |
I II
(MIGRATION CONTROL |$ 296|
[SECURITY | | 7.
| SAMPLING, ANALYSIS ( | >
I I I fi
I I I \
I II;
(ORGANIZED MATERIALS |$ 180|
(CONTAMINANT CONTAINMENT/RETENTION | |
(EXCAVATION | | ^
(SECURITY | |
(STORAGE | | :
I I I ;
-------
SUPERFUND EMERGENCY RESPONSE ACTIONS
HISTORICAL
|RG|ST| NAME | LOCATION
M 1 1
|02(NJ|MYERS PROPERTY ' (FRANKLIN TWP
III 1
III 1
Ml 1
|02|NJ (POMONA OAKS RESIDENTIAL WELLS [GALLOWAY TWP
III I
M 1 1
III 1
(02 |NJ (QUANTA RESOURCES [EDGEWATER
III 1
Ml 1
Ml 1
Ml 1
Ml 1
III 1
III 1
Ml i
M 1 1
M 1 1
NPL| INCIDENT | THREATS
| CATEGORY (
Y (INACTIVE PRODUCTION FACILITY (DIRECT CONTACT
| (SURFACE WATER CONTAMINATION
1 1
1 1
Y (OTHER (DRINKING WATER CONTAMINATION
| (AIR CONTAMINATION
| (GROUNDWATER CONTAMINATION
1 1
N (INACTIVE WASTE MANAGEMENT FACILITY [DIRECT CONTACT
| (FIRE/EXPLOSION
| (SURFACE WATER CONTAMINATION
| | GROUNDWATER CONTAMINATION
| (SOIL CONTAMINATION
1 1
1 1
1 1
1 1
1 1
1 1
| MITIGATIVE ACTIONS
1
(DISPOSAL
(REPACKED DRUMS
|SAMPLING,ANALYSIS
1
(WATER SUPPLIED
|SAMPLING,ANALYSIS
1
1
| COST |
($(000) |
|$ 75 1
1 1
1 1
1 1
|$ 13|
I I
I I
I I
(DISPOSAL |$ 1406 |
(PUMPED OUT CONTAMINANTS | |
(ORGANIZED MATERIALS | |
(SOLIDIFIED MATERIALS | |
(BULKED MATERIALS | |
(CONTAMINANT CONTAINMENT/RETENTION | |
(MIGRATION CONTROL | |
(EXCAVATION | |
(SECURITY | |
[SAMPLING, ANALYSIS | |
1 1 1
-------
SUPERFUND EMERGENCY RESPONSE ACTIONS
HISTORICAL
|RG|ST| NAME
1 1 !
|02|NJ|RENORA, INC.
1 1 1
1 1 1
1 1 I
1 1 1
1 1 1
|02|NJ|WALDICK AEROSPACE DEVICES
1 1 1
1 1 1
1 1 1
1 1 1
[02 [NY [ABANDONED DRUM
1 1 1
1 1 1
| 02 [NY (ABANDONED DRUMS-ERIE CANAL-CG
1 1 1
1 1 1
1 1 1
| LOCATION |NPL| INCIDENT | THREATS
1
| CATEGORY |
[EDISON TOWNSHIP] Y | INACTIVE WASTE MANAGEMENT FACILITY|FIRE/EXPLOSION
|
|
|
|
(WALL TOWNSHIP
|
I
|
I
| ROCKAWAY
I
|
[TONAWANDA
|
1
I
| [DIRECT CONTACT
1 1
1 1
1 1
1 1
Y [INACTIVE PRODUCTION FACILITY [DIRECT CONTACT
| [GROUNDWATER CONTAMINATION
| [SOIL CONTAMINATION
1 1
1 1
N [MIDNIGHT DUMP [DIRECT CONTACT
1 1
1 1
N [MIDNIGHT DUMP [SURFACE WATER CONTAMINATION
1 1
1 1
1 1
| MITIGATIVE ACTIONS | COST |
| [$(000) |
[DISPOSAL |$ 27 |
[REPACKED DRUMS | |
[BULKED MATERIALS | |
[SECURITY | |
[SAMPLING, ANALYSIS | |
1 1 1
[DISPOSAL [$ 35 | ,
[BULKED MATERIALS | | ;
[SECURITY | |
[SAMPLING, ANALYSIS | |
1 1 1
[DISPOSAL |$ 1|
[SAMPLING, ANALYSIS | |
I I I -;
[DISPOSAL |$ 1|
[ORGANIZED MATERIALS | |
[SAMPLING, ANALYSIS | |
I I I
-------
SUPERFUND EMERGENCY RESPONSE ACIIONS
HISTORICAl
|RG|ST| NAME | LOCATION
II 1
I 02 (NY (AMERICAN THERMOSTAT (SOUTH CAIRO
1 1 1
1 1 1
|02|NY|BAYSHORE (ISLIP
1 1
1 1 1
1
|02|NY|BERNCOLOR INC.-CG (POUGHKEEPS1E
1 1
1
1
1
1
1
|02|NY (BYRON BARREL & DRUM (BYRON
|NPL| INCIDENT | THREATS | H1TIGATIVE ACTIONS | COST
I CATEGORY | | |$(000)|
Y (ACTIVE PRODUCTION FACILITY (DRINKING WATER CONTAMINATION (WATER SUPPLIED |S 110|
| GROUNDUATER CONTAMINATION (SAMPLING, ANALYSIS | |
1 1
" (OTHER (DRINKING WATER CONTAMINATION [WATER SUPPLIED |$ 325|
I (AIR CONTAMINATION (RESTORATION | |
I IGROUNDWATER CONTAMINATION (SAMPLING .ANALYSIS | |
1 1 II
N (ACTIVE PRODUCTION FACILITY (FIRE/EXPLOSION (DISPOSAL |t 4Z7|
(DRINKING WATER CONTAMINATION (REPACKED DRUMS
(SURFACE WATER CONTAMINATION (MIGRATION CONTROL
I (EXCAVATION
I (RESTORATION
I (SAMPLING, ANALYSIS
1 1
N*| INACTIVE WASTE MANAGEMENT FACILITY|D1RECT CONTACT (DISPOSAL |$ 150|
(SOIL CONTAMINATION (REPACKED DRUMS
IGROUNDWATER CONTAMINATION (BULKED MATERIALS
| FIRE/EXPLOSION (EXCAVATION
| (SAMPLING, ANALYSIS
1 1
NOTEi NON-NPL SITE AT INITIATION OF REMOVAL. HOWEVER, CURRENTLY ON PROPOSED OR FINAL NPL.
-------
SUPERFUND EMERGENCY RESPONSE ACTIONS
HISTORICAL
|RG|ST| NAME | LOCATION |NPL| INCIDENT
III" " | || CATEGORY
|02|NY|CAYADUTTA CREEK (JOHNSTOWN | N (INACTIVE PRODUCTION FACILITY
III 1 II
III 1 II
III 1 II
III 1 II
|02|NY|FORT TOTTEN-CG (NYC-QUEENS | N (MIDNIGHT DUMP
1 1 1 1
111 1
|02|NY|JAGGER LANE | SOUTHAMPTON
III 1
III 1
| 02 | NY (KENTUCKY AVENUE WELL FIELD (HORSEHEADS
III 1
III 1
|02|NY (LINCOLN AVENUE (BOHEMIA
III 1
III 1
III 1
III 1
1
1
N (OTHER
1
1
Y [OTHER
1
1
N (OTHER
1
1
1
1
| THREATS
1
(DIRECT CONTACT
(SURFACE WATER CONTAMINATION
1
1
1
(SURFACE WATER CONTAMINATION
1
1
(DRINKING WATER CONTAMINATION
(GROUNDWATER CONTAMINATION
.1
(DRINKING WATER CONTAMINATION
| GROUNDWATER CONTAMINATION
1
(DIRECT CONTACT
(DRINKING WATER CONTAMINATION
(AIR CONTAMINATION
(GROUNDWATER CONTAMINATION
1
| MITIGATIVE ACTIONS
1
| COST |
($(000) |
(CONTAMINANT CONTAINMENT/RETENTION |$ 138|
(MIGRATION CONTROL
(SECURITY
(RESTORATION
1
(DISPOSAL
(SAMPLING, ANALYSIS
1
(WATER SUPPLIED
(RESTORATION
1
(WATER SUPPLIED
1
1
(WATER SUPPLIED
(RESTORATION
(SAMPLING, ANALYSIS
1
1
1 1
1 1
1 1
1 1
1$ 1(
I I
I I
|$ 476|
I I
I I
|$ 140|
I I
I I
|$ 102|
I I
I I
I I
I I
-------
SUPERFUND EMERGENCY RESPONSE ACTIONS
HISTORICAL .
|RG|ST| NAME
III
| 02 | NY (LONG ISLAND BEACH -CG
1 1 1
1 1 1
|02|NY|LOVE CANAL (BLACK CREEK)
1 1 1
III
1 1 1
1 1 1
1 1 1
1 1 1
|02|NY|MEK SPILL
1 1 1
1 1 1
1 1 1
1 1 1
1 1 1
| LOCATION |NPL| INCIDENT
| | | CATEGORY
|RYE
1
1
| NIAGARA FALLS
1
1
1
1
1
1
IHICKSVILLE
1
1
1
1
1
N (MIDNIGHT DUMP
1
1
N*| INACTIVE WASTE MANAGEMENT
1
1
1
1
1
1
N [TRANSPORTATION-RELATED
1
1
1
1
1
| THREATS
1
(DIRECT CONTACT
(DRINKING WATER CONTAMINATION
1
FACILITY (DIRECT CONTACT
(SURFACE WATER CONTAMINATION
(GROUNDWATER CONTAMINATION
1
1
1
1
(AIR CONTAMINATION
(FIRE/EXPLOSION
(DIRECT CONTACT
| GROUNDWATER CONTAM I NAT I ON
(SOIL CONTAMINATION
1
| MITIGATIVE ACTIONS
1
(SECURITY
(SAMPLING, ANALYSIS
1
| COST |
($(000) |
|$ 1|
I I
I I
(CONTAMINANT CONTAINMENT/RETENTION |$ 58 1
(CAPPED
(MIGRATION CONTROL
| RELOCAT ION/EVACUAT I ON
(SECURITY
(SAMPLING, ANALYSIS
1
(DISPOSAL
(SECURITY
| SAMPLING, ANALYSIS
1
1
1
I I
I I
I I
I |
I |
I I
|$ 900|
I |
I I
I I
I I
I I
NOTE: NON-NPL SITE AT INITIATION OF REMOVAL. HOWEVER, CURRENTLY ON PROPOSED OR FINAL NPL.
-------
SUPERFUND EMERGENCY RESPONSE ACTIONS
HISTORICAL
|RG|ST| NAME
LOCATION |NPL|
INCIDENT
CATiGORY
THREATS
MITIGATIVE ACTIONS
| COST |
|$(000)|
|02|NY|OLEAN WELL FIELD
IOLEAN
Y I OTHER
IDRINKING WATER CONTAMINATION [DISPOSAL
IGROUNDWATER CONTAMINATION |WATER SUPPLIED
| [SECURITY
| |SAMPLING,ANALYSIS
|$ 126|
1021NY|POLLUTION ABATEMENT SERVICES (PAS)
OSWEGO
N*|INACTIVE WASTE MANAGEMENT FACILITY[DIRECT CONTACT
| |FIRE/EXPLOSION
| IGROUNDWATER CONTAMINATION
| [SOIL CONTAMINATION
| [SURFACE WATER CONTAMINATION
[DISPOSAL
[REPACKED DRUMS
[PUMPED OUT CONTAMINANTS
[SOLIDIFIED MATERIALS
|CAPPED
[MIGRATION CONTROL
[SAMPLING,ANALYSIS
|$ 345|
I I
1021NY|SAG HARBOR
[SOUTHAMPTON
N [OTHER
[DRINKING WATER CONTAMINATION [WATER SUPPLIED
IGROUNDWATER CONTAMINATION [RESTORATION
| [SAMPLING,ANALYSIS
|$ 307|
NOTE: NON-NPL SITE AT INITIATION OF REMOVAL, HOWEVER, CURRENTLY ON PROPOSED OR FINAL NPL.
-------
SUPERFUND EMERGENCY RESPONSE ACTIONS
HISTORICAL
|RG|ST| NAME | LOCATION
III 1
|02|NY|SAMMIS AVENUE - DEER PARK | BABYLON
III |
Ml 1
Ml 1
M 1 |
|02|NY|SIGNO TRADING | WESTCHESTER
Ml I
M 1 |
Ml I
M 1 1
1 02 1 NY | WAD ING RIVER | SUFFOLK COUNTY
III |
Ml I
|02|NY|WALLKILL WELL |WALLKILL
Ml 1
Ml I
Ml |
NPL| INCIDENT | THREATS
| CATEGORY |
N | OTHER | DIRECT CONTACT
| [DRINKING WATER CONTAMINATION
| |AIR CONTAMINATION
| | GROUNDWATER CONTAMINATION
1 1
N | INACTIVE PRODUCTION FACILITY (DIRECT CONTACT
| [FIRE/EXPLOSION
1 1
1 1
1 1
N [OTHER [DRINKING WATER CONTAMINATION
| | GROUNDWATER CONTAMINATION
1 1
N [OTHER [DRINKING WATER CONTAMINATION
| | GROUNDWATER CONTAMINATION
1 1
1 1
| MITIGATIVE ACTIONS
1
[MIGRATION CONTROL
[WATER SUPPLIED
[RESTORATION
[SAMPLING, ANALYSIS
1
[DISPOSAL
[REPACKED DRUMS
[ORGANIZED MATERIALS
[SAMPLING, ANALYSIS
1
[WATER SUPPLIED
[SAMPLING, ANALYSIS
1
[PUMPED OUT CONTAMINANTS
[WATER SUPPLIED
[SAMPLING, ANALYSIS
1
| COST |
[$(000) |
|$ 36 1
1 1
1 1
1 1
1 1
|$ 134|
1 1
1 1
1 1
1 1
|$ 35 1
1 1
1 1
|$ 18|
I I
I I
I I
-------
SUPERFUND EMERGENCY RESPONSE ACTIONS
HISTORICAL
|RG|ST| NAME
LOCATION |NPL|
INCIDENT
CATEGORY
THREATS
MITIGATIVE ACTIONS
| COST |
|$(000)|
|02|NY|WIDE BEACH DEVELOPMENT
|BRANT
Y [OTHER
[DIRECT CONTACT [CONTAMINANT CONTAINMENT/RETENTION|$ 700|
|AIR CONTAMINATION [WATER SUPPLIED | |
[DRINKING WATER CONTAMINATION [SECURITY | |
|SOIL CONTAMINATION [RESTORATION | |
IGROUNDWATER CONTAMINATION [SAMPLING,ANALYSIS | |
|02|NY|WINDUS DRIVE
[SHIRLEY
N [OTHER
IDRINKING WATER CONTAMINATION [WATER SUPPLIED
IGROUNDWATER CONTAMINATION [SAMPLING,ANALYSIS
|$ 221
|02|NY|YORK OIL COMPANY
IMOIRA
INACTIVE WASTE MANAGEMENT FACILITY|SURFACE WATER CONTAMINATION
IGROUNDWATER CONTAMINATION
[SOIL CONTAMINATION
[DISPOSAL |$ 216]
[PUMPED OUT CONTAMINANTS | j
[SOLIDIFIED MATERIALS | |
[CONTAMINANT CONTAINMENT/RETENTION] |
[MIGRATION CONTROL | |
[EXCAVATION | |
[SECURITY | |
[RESTORATION | |
-------
SUPERFUND EMERGENCY RESPONSE ACTIONS
HISTORICAL
|RG|ST| NAME
1 1 1
| 02 | PR [DORADO DRUM SITE
1 1 1
1 1 1
1 1 1
1 1 1
| LOCATION |NPL| INCIDENT | THREATS
| | | CATEGORY |
[DORADO | N [MIDNIGHT DUMP [DIRECT CONTACT
1 1 1 [FIRE/EXPLOSION
1 I I [ECOLOGICAL DAMAGE
III 1
III 1
| MITIGATIVE ACTIONS | COST |
| |$(000)|
[DISPOSAL |$ 15 |
[REPACKED DRUMS | |
[SECURITY | |
|SAMPLING,ANALYSIS | |
1 1 1
|02|PR|PUERTO RICO ORGANIC INC
[ARECIBO | N [INACTIVE WASTE MANAGEMENT FACILITY|DIRECT CONTACT
I I I [FIRE/EXPLOSION
[DISPOSAL
[REPACKED DRUMS
[SAMPLING,ANALYSIS
|$ 310|
-------
U. S. EPA REGION 3
ALSO: DC
For Information Contact:
Chief, Super-fund Branch,
Hazardous Waste Management Division
841 Chestnut Street
Philadelphia, PA 19107
(215)597-8132
-------
SUPERFUND EMERGENCY RESPONSE ACTIONS
HISTORICAL
|RG|ST| NAME
1 1 1
| LOCATION |NPL|
1 1 1
INCIDENT
CATEGORY
| THREATS | MITIGATIVE ACTIONS | COST |
1 | |$(000)|
|03|DE(ARMY CREEK LANDFILL
I I I
I I I
|NEW CASTLE CTY
I
Y |INACTIVE WASTE MANAGEMENT FACILITY[DIRECT CONTACT
I IFIRE/EXPLOSION
[SAMPLING,ANALYSIS
401
|03|DE|DELAWARE SAND & GRAVEL LANDFILL |NEW CASTLE CTY
Y |INACTIVE WASTE MANAGEMENT FACILITY[DIRECT CONTACT [DISPOSAL
| [DRINKING WATER CONTAMINATION [ORGANIZED MATERIALS
I [AIR CONTAMINATION [EXCAVATION
| [SURFACE WATER CONTAMINATION [SECURITY
| [GROUNDWATER CONTAMINATION [RESTORATION
| [SOIL CONTAMINATION [SAMPLING,ANALYSIS
I I I
|$ 549|
|03|DE|DOVER AIR FORCE BASE
I I I
I I I
[DOVER
Y [OTHER
[DRINKING WATER CONTAMINATION [WATER SUPPLIED
| |SAMPLING,ANALYSIS
|$ 201
|03|DE|HARVEY & KNOTT DRUM SITE
IKIRKWOOD
Y [INACTIVE WASTE MANAGEMENT FACILITY[DIRECT CONTACT [REPACKED DRUMS
I [DRINKING WATER CONTAMINATION (WATER SUPPLIED
| [GROUNDWATER CONTAMINATION [SECURITY
I | [STORAGE
|$ 341
-------
SUPERFUND EMERGENCY RESPONSE ACTIONS
HISTORICAL
|RG|ST| NAME
LOCATION |NPL|
INCIDENT
CATEGORY
THREATS
MITIGATIVE ACTIONS
| COST |
|$(000)|
|03|DE|NEW CASTLE CONTAINERS |NEW CASTLE CTY
III 1
III 1
1 1 1 1
|03|DE|SEALAND LTD | MOUNT PLEASANT
II! 1
1 1 1
1 1 1
1 1 1
II 1
1 1 1
II .1
1 1 1
|03 DE|TYBOUTS CORNER LANDFILL |NEW CASTLE CTY
1 1 1
1 1 1
1 1 1
N
N
Y
INACTIVE WASTE MANAGEMENT FACILITY [DIRECT CONTACT
IFIRE/EXPLOSION
1
1
INACTIVE PRODUCTION FACILITY (DIRECT CONTACT
IFIRE/EXPLOSION
IFOOD CHAIN CONTAMINATION
|AIR CONTAMINATION
|SOIL CONTAMINATION
IGROUNDWATER CONTAMINATION
1
1
1
INACTIVE WASTE MANAGEMENT FACILITY [DRINKING WATER CONTAMINATION
[SURFACE WATER CONTAMINATION
IGROUNDWATER CONTAMINATION
1
[DISPOSAL
[ORGANIZED MATERIALS
[SAMPLING, ANALYSIS
1
[DISPOSAL
[ORGANIZED MATERIALS
[CAPPED
[MIGRATION CONTROL
[EXCAVATION
[SECURITY
[RESTORATION
[SAMPLING, ANALYSIS
1
[SAMPLING, ANALYSIS
1
1
1
|$ 95 1
1 1
1 1
1 1
|$ 732|
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 i
|$ 4|
1 1
1 1
1 1
-------
SUPERFUND EMERGENCY RESPONSE ACTIONS
HISTORICAL
|RG|ST| NAME
LOCATION |NPL|
INCIDENT
CATEGORY
THREATS
MITIGATIVE ACTIONS
| COST |
|$(000)|
|03|MD|BALTIMORE IRON & METALS-CG
I I I
| BALTIMORE
N (ACTIVE PRODUCTION FACILITY
1
IDIRECT CONTACT
(SURFACE WATER CONTAMINATION
1
[DISPOSAL 13
[CONTAMINANT CONTAINMENT/RETENTION|
[BULKED MATERIALS |
[EXCAVATION |
741
|03
[03
IMD
MD
[CALIFORNIA MD DRUM
CECIL COUNTY DUMP
|ST MARY'S CTY
NORTHEAST
N
N
[INACTIVE WASTE MANAGEMENT FACILITY|DIRECT CONTACT [DISPOSAL
[FIRE/EXPLOSION [ORGANIZED MATERIALS
|AIR CONTAMINATION (EXCAVATION
[GROUNDWATER CONTAMINATION [RESTORATION
|SOIL CONTAMINATION |SAMPLING,ANALYSIS
[ECOLOGICAL DAMAGE |
[SURFACE WATER CONTAMINATION
|AIR CONTAMINATION
INACTIVE WASTE MANAGEMENT FACILITY|DIRECT CONTACT "[DISPOSAL
[DRINKING WATER CONTAMINATION [REPACKED DRUMS
|AIR CONTAMINATION [BULKED MATERIALS
[SURFACE WATER CONTAMINATION [CAPPED
| [MIGRATION CONTROL
| | EXCAVATION
| [SECURITY
I [SAMPLING, ANALYSIS
1 1
|$ 468
$ 688
-------
SUPERFUMD EMERGENCY RESPONSE ACTIONS
HISTORICAL
|RG|ST| NAME | LOCATION
I 1 1
03 |MD| CHEMICAL METALS INDUSTRIES (BALTIMORE
1
1
1
1
03 |MD| COLUMBIA PARK DRUM [COLUMBIA PARK
1 1
1 1
1 1
III
1 1
j 03 |MD| EVANS TRAIL |CALVERTON
NPL| INCIDENT | THREATS | MITIGATIVE ACTIONS | COST |
| CATEGORY | 1 l$(000>l
N (INACTIVE PRODUCTION FACILITY (DIRECT CONTACT (DISPOSAL |* 197|
(AIR CONTAMINATION (CAPPED |
(FIRE/EXPLOSION (EXCAVATION |
(SURFACE WATER CONTAMINATION (SAMPLING, ANALYSIS |
(SOIL CONTAMINATION | |
I I I
N (MIDNIGHT DUMP (DIRECT CONTACT (DISPOSAL |$ 158J
(AIR CONTAMINATION (ORGANIZED MATERIALS |
| (SURFACE WATER CONTAMINATION (EXCAVATION |
| (GROUNDWATER CONTAMINATION (SECURITY |
| | SAMPLING, ANALYSIS |
I I I
N (INACTIVE PRODUCTION FACILITY (DIRECT CONTACT (DISPOSAL |$ 169
(SOIL CONTAMINATION (ORGANIZED MATERIALS |
( (MIGRATION CONTROL |
( (EXCAVATION |
| (RESTORATION |
( | SAMPLING, ANALYSIS |
I I I
-------
SUPERFUND EMERGENCY RESPONSE ACTIONS
HISTORICAL
|RG|ST| NAME LOCATION
1 1
|03|MD|KANE & LOMBARD STREET DRUMS (BALTIMORE
I
1
1
1
1
1
| 03 | MO (LOCOMOTIVE JUNKYARD -CG | BALTIMORE
1 1
1 1
03|MD|MIDDLETOWN ROAD DUMP (ANNAPOLIS
II
1
1 1
1 1
1 1
|NPL| INCIDENT
CATEGORY
N*| INACTIVE WASTE MANAGEMENT
N (ACTIVE PRODUCTION FACILITY
1
Y (INACTIVE WASTE MANAGEMENT
1
1
1
1
1
| THREATS
1
FACILITY (DIRECT CONTACT
(FIRE/EXPLOSION
(GROUNDWATER CONTAMINATION
(SOIL CONTAMINATION
1
1
1
(DIRECT CONTACT
(SOIL CONTAMINATION
1
FACILITY (DIRECT CONTACT
(SOIL CONTAMINATION
(SURFACE WATER CONTAMINATION
| GROUNDWATER CONTAMINATION
1
1
| MITIGATIVE ACTIONS
1
(DISPOSAL
(REPACKED DRUMS
(MIGRATION CONTROL
(SECURITY
(RESTORATION
(SAMPLING, ANALYSIS
1
(SAMPLING, ANALYSIS
1
1
(DISPOSAL
(REPACKED DRUMS
(EXCAVATION
(RESTORATION
(SAMPLING, ANALYSIS
1
| COST
($(000)
|$ 546|
1
1
|
|
1
1 1
|$ 1|
I I
I I
|$ 467|
I
I
I
|
I
* NOTE: NON-NPL SITE AT INITIATION OF REMOVAL. HOWEVER, CURRENTLY ON PROPOSED OR FINAL NPL.
-------
SUPERFUND EMERGENCY RESPONSE ACTIONS
HISTORICAL
|RG|ST| NAME
I I I
|03|MD|SAND, GRAVEL & STONE
LOCATION |NPL|
INCIDENT
CATEGORY
THREATS
MITIGATIVE ACTIONS
| COST |
[$(000)|
IELKTON
Y (INACTIVE WASTE MANAGEMENT FACILITY|DIRECT CONTACT
IFIRE/EXPLOSION
[DRINKING WATER CONTAMINATION
(SOIL CONTAMINATION
[SURFACE WATER CONTAMINATION
IGROUNDWATER CONTAMINATION
I
|SAMPLING,ANALYSIS
|$
|03|MD|SECURITY BOULEVARD
(BALTIMORE
N [INACTIVE WASTE MANAGEMENT FACILITY|DIRECT CONTACT
[FIRE/EXPLOSION
[AIR CONTAMINATION
[SOIL CONTAMINATION
[DISPOSAL
[REPACKED DRUMS
(BULKED MATERIALS
[MIGRATION CONTROL
[EXCAVATION
[SECURITY
[RESTORATION
|SAMPLING,ANALYSIS
|$
|03|MD|SOUTHERN MARYLAND WOOD TREATING [HOLLYWOOD
Y [INACTIVE PRODUCTION FACILITY
[DIRECT CONTACT
[SURFACE WATER CONTAMINATION
[GROUNDUATER CONTAMINATION
[DISPOSAL |$
[PUMPED OUT CONTAMINANTS |
[ORGANIZED MATERIALS |
[CAPPED |
[CONTAMINANT CONTAINMENT/RETENTION |
[MIGRATION CONTROL |
[EXCAVATION |
[SECURITY 1
[SAMPLING, ANALYSIS |
460 |
-------
SUPERFUND EMERGENCY RESPONSE ACTIONS
HISTORICAL
|RG|ST| NAME LOCATION
1
|03|MD|SPRINGER SEPTIC SERVICES-CG (CHAPTICO
II
1
|03|MD|UNION PLATING |BALTIHORE
1
1
1
1
1
|03|MD|UNITED RIGGING & HAULING (BELTSVILLE
|NPL| INCIDENT
| | CATEGORY
| N IMIDNIGHT DUMP
1 1
1 1
N [INACTIVE PRODUCTION FACILITY
N (ACTIVE PRODUCTION FACILITY |
1
1
THREATS | HITIGATIVE ACTIONS | COST
1 ($(000)
SURFACE WATER CONTAMINATION [DISPOSAL |$ 55]
SOIL CONTAMINATION |SAMPLING,ANALYSIS |
1 1 1
DIRECT CONTACT (DISPOSAL |$ 50 |
AIR CONTAMINATION |ORGANIZED MATERIALS |
(BULKED MATERIALS |
(EXCAVATION |
(SECURITY |
(RESTORATION |
1 1
DIRECT CONTACT (DISPOSAL |$ 450 |
ECOLOGICAL DAMAGE (ORGANIZED MATERIALS |
SURFACE WATER CONTAMINATION (CONTAMINANT CONTAINMENT/RETENTION |
(MIGRATION CONTROL |
(EXCAVATION |
(SECURITY |
(SAMPLING, ANALYSIS |
1 1
-------
SUPERFUND EMERGENCY RESPONSE ACTIONS
HISTORICAL
|RG|ST| NAME I LOCATION |NPL| INCIDENT
|| | II CATEGORY
|03|PA|ABM EDDYSTONE (DELAWARE COUNTY] N (INACTIVE WASTE MANAGEMENT
1 1 1
1 1 1
II 1
1 1 1
1 1 1
1 1 1
1 1 1
(03 (PA (AMBLER ASBESTOS PILES (AMBLER
1 1 1
1 1 1
1 1 1
1 1 1
1 1 I
(03 (PA (APACHE WASTE OIL | CONSHOHOCKEN
III 1
1 1 1
1 1 1
1 1 1
1 1 1
1
1
1
1
1
1
1
N*| INACTIVE WASTE MANAGEMENT
1
1
1
1
1
N (INACTIVE WASTE MANAGEMENT
1
1
1
1
1
| THREATS
| MITIGATIVE ACTIONS
COST
| | ($(000) |
FACILITY (DIRECT CONTACT
(SOIL CONTAMINATION
(SURFACE WATER CONTAMINATION
IGROUNDWATER CONTAMINATION
1
1
1
1
FACILITY (DIRECT CONTACT
(DRINKING WATER CONTAMINATION
(AIR CONTAMINATION
1
1
1
FACILITY (DIRECT CONTACT
(FIRE/EXPLOSION
(SURFACE WATER CONTAMINATION
1
1
1
.(DISPOSAL !
(REPACKED DRUMS
(ORGANIZED MATERIALS
(BULKED MATERIALS
(EXCAVATION
(SECURITY
(SAMPLING, ANALYSIS
1
$ 392 1
(CAPPED |$ 751 |
(MIGRATION CONTROL
(SECURITY
(RESTORATION
| SAMPLING, ANALYSIS
I
.;; "
(DISPOSAL |S 261
(PUMPED OUT CONTAMINANTS
| CONTAM I NANT CONTAI NMENT/RETENT I ON |
(SECURITY
(SAMPLING, ANALYSIS
I
* NOTE: NON-NPL SITE AT INITIATION OF REMOVAL. HOWEVER, CURRENTLY ON PROPOSED OR FINAL NPL.
-------
SUPERFUND EMERGENCY RESPONSE ACTIONS
HISTORICAL
|RG|ST| NAME | LOCATION
Ml I
|03|PA|BENSALEH DRUM [BENSALEM TWP
III 1
III" ' |
Ml I
M 1 I
|NPL| INCIDENT | THREATS
| CATEGORY |
N [INACTIVE WASTE MANAGEMENT FACILITY|DIRECT CONTACT
1 IFIRE/EXPLOSION
1 1
1 1
1 1
| MITIGATIVE ACTIONS
1
[DISPOSAL
[SAMPLING, ANALYSIS
| SECURITY
1
1
| COST |
|S(000)|
|$ 290 |
1 1
1 1
1 1
1 1
|03|PA|BERKS SAND PIT-VAN ELLSWYCK [LONGSWAHP TWP
1
1
1
1
1
[03|PA|BFG ELECTROPLATING JPUNXSUTAWNEY
1 1
1 1
1 1
1 1 1
1 1 1
1 1 1
1 1 1
Y [OTHER
1
1
1
1
1
N (INACTIVE PRODUCTION FACILITY
1
1
1
1
1
1
1
[DRINKING WATER CONTAMINATION
[SURFACE WATER CONTAMINATION
[GROUNDWATER CONTAMINATION
1
1
1
[DIRECT CONTACT
[AIR CONTAMINATION
[SOIL CONTAMINATION
[SURFACE WATER CONTAMINATION
1
1
1
1
[WATER SUPPLIED
[EXCAVATION
| RE LOCAT I ON/E VACUAT I ON
[RESTORATION
(SAMPLING, ANALYSIS
I
[DISPOSAL
[NEUTRALIZED MATERIALS
[MIGRATION CONTROL
(EXCAVATION
(SECURITY
(RESTORATION
[SAMPLING, ANALYSIS
1
|$
1
1
1
1
1
1$
1
1
1
1
1
1
1
783 1
1
1
1
1
1
130 1
1
1
1
1
1
1
1
-------
SUPERFUND EMERGENCY RESPONSE ACTIONS
HISTORICAL
RG|ST| NAME LOCATION
03|PA|BIEDLER ROAD [UPPER MERION TW
!
|03|PA|BOYERTOWN SCRAP METAL |BOYERTOWN
1
1
1
1
|03|PA|BRODHEAD CREEK [STROUDSBURG
1
1
1
NPLj INCIDENT | THREATS | MITIGATIVE ACTIONS |
| CATEGORY | 1
N [MIDNIGHT DUMP [DIRECT CONTACT [DISPOSAL
| [FIRE/EXPLOSION [REPACKED DRUMS
| [AIR CONTAMINATION [ORGANIZED MATERIALS
| [SOIL CONTAMINATION [EXCAVATION
| [GROUNDWATER CONTAMINATION [SECURITY
| [ECOLOGICAL DAMAGE [SAMPLING, ANALYSIS
| (SURFACE WATER CONTAMINATION |
1 1 1
N [INACTIVE WASTE MANAGEMENT FACILITY (DIRECT CONTACT [DISPOSAL
| [FIRE/EXPLOSION [ORGANIZED MATERIALS
| [SOIL CONTAMINATION [EXCAVATION
| | [SECURITY
| | [SAMPLING, ANALYSIS
1 1 1
N*|INACTIVE PRODUCTION FACILITY [DIRECT CONTACT [DISPOSAL
| [DRINKING WATER CONTAMINATION [MIGRATION CONTROL
| [FOOD CHAIN CONTAMINATION [SECURITY
| [ECOLOGICAL DAMAGE [RESTORATION
| [SURFACE WATER CONTAMINATION [SAMPLING, ANALYSIS
| |SOIL CONTAMINATION |
1 1 1
COST |
$(000) |
$ 5|
$ 35|
$ 427 1
1
!
* NOTE: NON-NPL SITE AT INITIATION OF REMOVAL. HOWEVER, CURRENTLY ON PROPOSED OR FINAL NPL.
-------
SUPERFUND EMERGENCY RESPONSE ACTIONS
HISTORICAL
IRG1STI NAME | LOCATION |NPL
1 1 II
|03
03
1
1
(PA
PA
BROWN'S BATTERY BREAKING
BRUIN LAGOON
SHOEMAKERSVILLE
BRUIN BOROUGH
| N*
Y
1 INCIDENT | THREATS | HITIGATIVE ACTIONS | COST |
CATEGORY | |$(000)|
[INACTIVE PRODUCTION FACILITY (DIRECT CONTACT (DISPOSAL |$ 1239|
(SURFACE WATER CONTAMINATION (BULKED MATERIALS | |
(SOIL CONTAMINATION (CAPPED | |
(CONTAMINANT CONTAINMENT/RETENTION] |
(EXCAVATION | |
(RELOCATION/EVACUATION | |
(RESTORATION | |
(SAMPLING, ANALYSIS | |
I I I
INACTIVE PRODUCTION FACILITY (DIRECT CONTACT (DISPOSAL |$ 878 |
(DRINKING WATER CONTAMINATION (CAPPED | j
(SURFACE WATER CONTAMINATION (CONTAMINANT CONTAINMENT/RETENTIONl |
(GROUNDWATER CONTAMINATION (PUMPED OUT CONTAMINANTS | |
(ECOLOGICAL DAMAGE (MIGRATION CONTROL | |
| (EXCAVATION | |
| (SECURITY | |
| (RESTORATION | |
| | SAMPLING, ANALYSIS | |
I I I
NOTE: NON-NPL SITE AT INITIATION OF REMOVAL. HOWEVER, CURRENTLY ON PROPOSED OR FINAL NPL.
-------
SUPERFUND EMERGENCY RESPONSE ACTIONS
HISTORICAL
|RG|ST| NAME | LOCATION |NPL| INCIDENT
III 1
(03 (PA (BUR I ED DRUM REMOVAL (MCKEAN COUNTY
III
1 1 1
1 1 1
1 1 1
III
|03|PA|BUTLER TUNNEL (PITTSTON
III 1
III 1
III -1
III 1
III 1
|03|PA|C & F CHEMICAL |W. GOSHEN
Ml 1
III 1
III 1
II 1 1
| CATEGORY
N (MIDNIGHT DUMP
1
1
1
1
1
N*| INACTIVE WASTE MANAGEMENT
1
1
1
1
1
N (ACTIVE PRODUCTION FACILITY
1
1
1
1
| THREATS
| MITIGATIVE ACTIONS | COST |
| | |$<000)|
(SURFACE WATER CONTAMINATION
(SOIL CONTAMINATION
1
1
1
1
FACILITY (DIRECT CONTACT
(DRINKING WATER CONTAMINATION
(SURFACE WATER CONTAMINATION
1
1
1
(AIR CONTAMINATION
(SOIL CONTAMINATION
1
1
1
(DISPOSAL |$
(REPACKED DRUMS |
(ORGANIZED MATERIALS |
(EXCAVATION |
(SAMPLING, ANALYSIS |
1 1
(ORGANIZED MATERIALS |$
(CONTAMINANT CONTAINMENT/RETENTION |
(MIGRATION CONTROL |
(SECURITY |
(SAMPLING, ANALYSIS |
1 1
(DISPOSAL |$
(REPACKED DRUMS |
(EXCAVATION |
(RELOCATION/EVACUATION |
1 1
0|
1
1
1
1
1
400 1
1
1
1
1
1
59|
1
1
1
1
* NOTE: NON-NPL SITE AT INITIATION OF REMOVAL. HOWEVER, CURRENTLY ON PROPOSED OR FINAL NPL.
-------
SUPERFUND EMERGENCY RESPONSE ACTIONS
HISTORICAL
|RG|ST| NAME
1
|03|PA|C.E. BRUBAKER
It 1
1 1
I 1 1
1 1 1
1 1
03 | PA | CAMP RUN DRUM
1
1 I 1
1 1 1
1 1
03 | PA | CAUSTIC MIDNIGHT DUMP
II |
1 1
1 1
1 1
03|PA|DORNEY ROAD LANDFILL
1
1
1
1
1
| LOCATION |NPL|
1
[LANCASTER
1
1
1
1
[MCKEAN COUNTY
1
1
I
1
(PHILADELPHIA
1
1
1
[UPPER MACUNGIE
1
1
1
1
1
N INACTIVE
1
1
1
N [MIDNIGHT
1
1
1
1
N [MIDNIGHT
1
1
Y (INACTIVE
INCIDENT | THREATS
CATEGORY |
PRODUCTION FACILITY [DIRECT CONTACT
1
1
1
1
DUMP [DIRECT CONTACT
[SURFACE WATER CONTAMINATION
1
1
1
DUMP (DIRECT CONTACT
[SURFACE WATER CONTAMINATION
[SOIL CONTAMINATION
1
WASTE MANAGEMENT FACILITY [DIRECT CONTACT
[DRINKING WATER CONTAMINATION
(GROUNDUATER CONTAMINATION
[SURFACE WATER CONTAMINATION
[SOIL CONTAMINATION
1
| MITIGATIVE ACTIONS
1
[DISPOSAL
(PUMPED OUT CONTAMINANTS
| RELOCATION/EVACUATION
[SECURITY
1
[DISPOSAL
[REPACKED DRUMS
[ORGANIZED MATERIALS
(SAMPLING, ANALYSIS
1
[DISPOSAL
(REPACKED DRUMS
|
I
| COST
|$(000)|
|$ 450 |
| j
| |
| |
I I
|$ 25 1
I |
| |
|
I I
|$ 1|
| |
| |
I 1
1 1
(CONTAMINANT CONTAINMENT/RETENTION |$ 140|
(MIGRATION CONTROL
(SECURITY
(RESTORATION
|SAMPLING,ANALYSIS
I
1
I
I
I
1
-------
SUPERFUND EMERGENCY RESPONSE ACTIONS
HISTORICAL
|RG|ST| NAME | LOCATION
1 1 1
|03|PA|DRACUP WAREHOUSE [YOUNGSVILLE
1 1 1
1 1 1
1 1 1
1 1 1
1 1 1
1 1 1
| 03 | PA | DRAKE CHEMICAL (LOCK HAVEN
II 1
II .1
II 1
1 1 1
1 1 1
1 1 1
1 1 1
1 1 1
II 1
NPL|
1
N | INACTIVE
1
1
1
1
1
1
Y (INACTIVE
1
1
1
1
1
1
1
1
1
INCIDENT | THREATS
CATEGORY |
WASTE MANAGEMENT FACILITY [DRINKING WATER CONTAMINATION
|AIR CONTAMINATION
IGROUNDWATER CONTAMINATION
(SOIL CONTAMINATION
| SURFACE WATER CONTAMINATION
1
1
PRODUCTION FACILITY [DIRECT CONTACT
IFIRE/EXPLOSION
|AIR CONTAMINATION
|SOIL CONTAMINATION
IGROUNDWATER CONTAMINATION
| SURFACE WATER CONTAMINATION
1
1
1
1
| MITIGATIVE ACTIONS COST |
| |$<000)|
(DISPOSAL |$ 467 |
[CAPPED | |
[MIGRATION CONTROL | |
[EXCAVATION | |
[RESTORATION | |
[SAMPLING.ANALYSIS |
1 1
[DISPOSAL |$ 879)
[ORGANIZED MATERIALS |
[BULKED MATERIALS |
[SOLIDIFIED MATERIALS |
[CONTAMINANT CONTAINMENT/RETENTION |
[MIGRATION CONTROL ' |
[EXCAVATION |
[SECURITY |
[SAMPLING, ANALYSIS |
1 1
-------
SUPERFUND EMERGENCY RESPONSE ACTIONS
HISTORICAL
|RG|ST| NAME
1 1 1
|03|PA|DUNCANSVILLE TANKER
1 1 1
1 1 1
1 1 1
|03|PA|DUNNING MOUNTAIN DRUM FIRE
1 1 1
1 1 1
I 1 1
1 I 1
1 1 1
|03|PA|EAST CUMBERLAND STREET
1 1 1
1 1 1
1 1 1
| 03 | PA | EWE ING ROAD DRUM SITE
1 1 1
1 1 1
1 1 1
1 1 1
1 1 1
| LOCATION |NPL| INCIDENT
I | | CATEGORY
IDUNCANSVILLE
1
1
1
| BLAIR COUNTY
1
1
1
1
1
(PHILADELPHIA
1
1
1
| COLLIER TUP
1
1
1
1
1
| THREATS
i
N [INACTIVE WASTE MANAGEMENT FACILITY [DIRECT CONTACT
1 (FIRE/EXPLOSION
1
1
N [MIDNIGHT DUMP
1
1
1
1
1
N | INACTIVE PRODUCTION FACILITY
1
1
1
N (MIDNIGHT DUMP
1
1
1
1
1
[SOIL CONTAMINATION
1
[DIRECT CONTACT
[FIRE/EXPLOSION
(SOIL CONTAMINATION
1
1
1
| DIRECT CONTACT
|AIR CONTAMINATION
[SURFACE WATER CONTAMINATION
1
[DIRECT CONTACT
IFIRE/EXPLOSION
[SURFACE WATER CONTAMINATION
[SOIL CONTAMINATION
1
1
| MITIGATIVE ACTIONS
1
[SAMPLING, ANALYSIS
[REPACKED DRUMS
1
1
[DISPOSAL
[REPACKED DRUMS
[BULKED MATERIALS
[EXCAVATION
[SAMPLING, ANALYSIS
1
[REPACKED DRUMS
[STORAGE
1
1
[DISPOSAL
[REPACKED DRUMS
[ORGANIZED MATERIALS
[SECURITY
[SAMPLING.ANALYSIS
1
| COST |
[$(000) |
1$
1
1
1
1$
1
1
1
1
1
1$
1
1
1
1$
1
1
1
1
1
73 1
1
1
1
20 1
1
1
1
1
1
1|
I
I
I
25 1
I
I
I
I
I
-------
SUPERFUND EMERGENCY RESPONSE ACTIONS
HISTORICAL
|RG|ST| NAME
1 1 1
| 03 | PA | FENNEL ROAD
1 1 1
1 1 1
1 1 1
1 1 1
1 03 (PA (GARAGE FIRE
1 1 1
1 1 1
1 1 1
|03|PA|GRADYVILLE MIDNIGHT DUMP
III
1 1 1
1 1 1
1 1 1
1 1 1
|03|PA|HIGH QUALITY PLATING
1 1 1
1 1 1
1 1 1
1 1 1
1 1 1
1 1 1
| LOCATION |NPL|
1 1 1
(BUCKS COUNTY
1
1
1
1
IGLENSIDE
1
1
1
IGLEN MILLS
|
1
1
1
(OLD ZIONSVILLE
1
1
1
1
1
1
N. (MIDNIGHT
1
1
1
1
N (INACTIVE
1
1
1
N (MIDNIGHT
1
1
1
1
1
N (INACTIVE
1
1
1
1
1
1
INCIDENT | THREATS
CATEGORY |
DUMP (DIRECT CONTACT
(FIRE/EXPLOSION
1
1
1
WASTE MANAGEMENT FACILITY|FIRE/EXPLOSION
(AIR CONTAMINATION
1
1
DUMP (DIRECT CONTACT
(FIRE/EXPLOSION
(AIR CONTAMINATION
(SOIL CONTAMINATION
1
1
PRODUCTION FACILITY (DIRECT CONTACT
(AIR CONTAMINATION
(SURFACE WATER CONTAMINATION
1
1
1
1
| MITIGATIVE ACTIONS
1
(DISPOSAL
(NEUTRALIZED MATERIALS
(REPACKED DRUMS
(SAMPLING, ANALYSIS
1
(DISPOSAL
(REPACKED DRUMS
(RELOCATION/EVACUATION
1
(DISPOSAL
(REPACKED DRUMS
| COST |
|$(000)|
|$
1
1
1
1
|$
1
1
1
|$
1
| CONTAM I NANT CONTA I NMENT/RETENT I ON |
(EXCAVATION
(SAMPLING, ANALYSIS
1
(DISPOSAL
(REPACKED DRUMS
(PUMPED OUT CONTAMINANTS
(ORGANIZED MATERIALS
(MIGRATION CONTROL
(SAMPLING, ANALYSIS
1
1
1
1
|$
1
1
1
1
1
1
10 1
1
1
1
1
8|
1
1
1
10|
I
I
I
I
I
15|
1
1
1
1
1
1
-------
SUPERFUND EMERGENCY RESPONSE ACTIONS
HISTORICAL
|RG|ST| NAME | LOCATION |NPL| INCIDENT
III 1
| 03 | PA (INTERSTATE TRANSFORMER JELLUOOD CITY
1 1
1 1
1 1
1 1
1 1
1 1
II
|03|PA|KRUM TRASH | DANVILLE
II
1 1 1
1 1 1
| CATEGORY
N [ACTIVE PRODUCTION FACILITY
1
1
1
1
1
1
1
| THREATS
1
[DIRECT CONTACT
(SURFACE WATER CONTAMINATION
[GROUNDWATER CONTAMINATION
1
1
1
1
1
N [ACTIVE WASTE MANAGEMENT FACILITY [DIRECT CONTACT
1
1
1
|03|PA|LACKAUANNA REFUSE [OLD FORGE BOROU| Y (INACTIVE WASTE MANAGEMENT
III ' | '
Ml' 1
III ' I
III 1
1 '
1
1
1
[DRINKING WATER CONTAMINATION
[SURFACE WATER CONTAMINATION
1
FACILITY [DIRECT CONTACT
[AIR CONTAMINATION
[SURFACE WATER CONTAMINATION
[GROUNDWATER CONTAMINATION
1
| MITIGATIVE ACTIONS
1
[DISPOSAL
[ORGANIZED MATERIALS
[BULKED MATERIALS
[EXCAVATION
[SECURITY
[RESTORATION
(SAMPLING, ANALYSIS
1
[DISPOSAL
[STORAGE
1
1
(SECURITY
(SAMPLING, ANALYSIS
1
1
1
| COST |
($(000) |
|$ 405 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
|$ 56|
1 1
1 1
1 1
|$ 102|
I I
I I
I I
I I
-------
SUPERFUND EMERGENCY RESPONSE ACTIONS
HISTORICAL
|RG|ST| NAME | LOCATION
II i 1
|03|PA|MALITOVSKY DRUM CO. |PITTSBURGH
Ml 1
Ml I
Ml 1
II 1 1
III 1
III 1
III 1
III 1
II 1 1
| 03 | PA | MERCER COUNTY DRUM DUMP (MERCER COUNTY
M 1 I
M 1 I
Ml 1
Ml 1
Ml 1
Ml 1
Ml 1
Ml 1
NPL| INCIDENT | THREATS
| CATEGORY |
N [INACTIVE PRODUCTION FACILITY [DIRECT CONTACT
| IFIRE/EXPLOSION
| |AIR CONTAMINATION
| [SOIL CONTAMINATION
1 1
1 1
1 1
1 1
1 1
1 1
N IMIDNIGHT DUMP [DIRECT CONTACT
| (FIRE/EXPLOSION
| (DRINKING WATER CONTAMINATION
| |AIR CONTAMINATION
| (SOIL CONTAMINATION
1 1
1 1
1 1
1 1
| MITIGATIVE ACTIONS
1
(DISPOSAL
(REPACKED DRUMS
(ORGANIZED MATERIALS
(SOLIDIFIED MATERIALS
(BULKED MATERIALS
(PUMPED OUT CONTAMINANTS
(EXCAVATION
(SECURITY
(SAMPLING, ANALYSIS
1
| COST |
|$COOO)|
|$ 787 |
1 1
1 1
1 1
1 1
1 i
1 1
1 1
1 1
1 1
(DISPOSAL |$ 8|
(REPACKED DRUMS | |
(ORGANIZED MATERIALS | |
(BULKED MATERIALS | |
(CONTAMINANT CONTAINMENT/RETENTION | |
(EXCAVATION | |
(RESTORATION | |
(SAMPLING, ANALYSIS | |
1 1 1
-------
SUPERFUND EMERGENCY RESPONSE ACTIONS
HISTORICAL
|RG|ST| NAME | LOCATION
II! 1
|03|PA|HT POCONO | MONROE COUNTY
III 1
III 1
III 1
1 03 1 PA (OLD AMERICAN GLYCERINE-LEWIS RUN [MCKEAN COUNTY
1 1 1
1 1 1
1 1 1
1 1 1
1 1 1
1 1 1
1 1 1
|03|PA|OLD GARAGE [MARION HEIGHTS
III 1
Ml 1
III 1
III . 1
1 1 1
NPL| INCIDENT | THREATS
| CATEGORY |
N [INACTIVE WASTE MANAGEMENT FACILITY|DIRECT CONTACT
| [FIRE/EXPLOSION
1 1
1 1
N [INACTIVE PRODUCTION FACILITY [DIRECT CONTACT
[FIRE/EXPLOSION
[DRINKING WATER CONTAMINATION
[SURFACE WATER CONTAMINATION
[SOIL CONTAMINATION
1
1
1
N [INACTIVE WASTE MANAGEMENT FACILITY|DIRECT CONTACT
| [FIRE/EXPLOSION
| [AIR CONTAMINATION
| [SOIL CONTAMINATION
1 1
1 1
| MITIGATIVE ACTIONS
1
[DISPOSAL
[BULKED MATERIALS
[SAMPLING.ANALYSIS
1
[DISPOSAL
[ORGANIZED MATERIALS
[REPACKED DRUMS
| PUMPED OUT CONTAMINANTS
[NEUTRALIZED MATERIALS
[SECURITY
[SAMPLING, ANALYSIS
1
[DISPOSAL
[REPACKED DRUMS
[EXCAVATION
[SECURITY
[SAMPLING, ANALYSIS
1
COST |
$(000) |
$ 46 1
$ 280 1
$ 7
1
1
-------
SUPERFUND EMERGENCY RESPONSE ACTIONS
HISTORICAL
|RG|ST| NAME | LOCATION |NPL| INCIDENT
1 1
|03|PA|PATRICK DIEHL |BLAIR COUNTY
1
I
1
I
I
03|PA|PINEY CREEK DRUM |BLAIR COUNTY
1 1 1
1 1 1
1 1 1
1 1 1
03|PA|POTTSTOWN ABANDONED TRAILER (POTTSTOUN
1 1 1
1 1 1
1
|03|PA|PRINTED CIRCUITS, INC. (BUCKS COUNTY
III 1
1 1 1
1 1 1
1 1
II 1
1 1 1
| CATEGORY
N (MIDNIGHT DUMP
N (MIDNIGHT DUMP
1
1
1
1
N (MIDNIGHT DUMP
1
1
1
N (INACTIVE WASTE MANAGEMENT
| THREATS
1
(DIRECT CONTACT
(FIRE/EXPLOSION
(SOIL CONTAMINATION
1
1
1
(DIRECT CONTACT
1
| MIT1GATIVE ACTIONS
1
(DISPOSAL
(REPACKED DRUMS
(EXCAVATION
(RESTORATION
(SAMPLING, ANALYSIS
1
(DISPOSAL
(PUMPED OUT CONTAMINANTS
| COST |
|$(000)|
|$ 26|
1
1
1
I
1
|$ 15|
1 1
| (CONTAMINANT CONTAINMENT/RETENTION) |
1
1
(AIR CONTAMINATION
(FIRE/EXPLOSION
(DIRECT CONTACT
1
FACILITY (DIRECT CONTACT
(FIRE/EXPLOSION
(SOIL CONTAMINATION
1
1
1
1
(SAMPLING, ANALYSIS
1
(DISPOSAL
(SECURITY
(SAMPLING, ANALYSIS
1
(DISPOSAL
(REPACKED DRUMS
(EXCAVATION
(SECURITY
(RESTORATION
(SAMPLING, ANALYSIS
1
1 1
1 1
|$ 188|
I I
I
I
|$ 352 |
I I
I I
I I
I I
I I
I
-------
SUPERFUND EMERGENCY RESPONSE ACTIOMS
HISTORICAL
|RG|ST| NAME
1 1
| 03 (PA (REVERE CHEMICAL CO.
1 1
1 1
1 1
1 1
1 1
03|PA|ROUTE 13 DRUM SITE
I I I
I I I
I I
I I
| LOCATION (1
1 . 1
INOCKAMIXON TOWN)
1 1
1 1
1 1
1 1
1 1
(BUCKS COUNTY |
1 1
1 1
1 1
1 1
JPL| INCIDENT
| CATEGORY
N*|INACTIVE PRODUCTION FACILITY
1
1
1
1
1
N (MIDNIGHT DUMP
1
1
1
1
| THREATS
1
(DIRECT CONTACT
(SURFACE WATER CONTAMINATION
| GROUNDWATER CONTAMINATION
(SOIL CONTAMINATION
I
1
(DIRECT CONTACT
(FIRE/EXPLOSION
(AIR CONTAMINATION
1
1
| MITIGATIVE ACTIONS
1
(DISPOSAL
(REPACKED DRUMS
(ORGANIZED MATERIALS
(EXCAVATION
(SAMPLING, ANALYSIS
1
(DISPOSAL
(REPACKED DRUMS
(SECURITY
(SAMPLING, ANALYSIS
1
| COST |
($(000) |
|$ 79|
1 1
1 1
1 1
1 1
1 1
|$ 15|
I I
I I
I I
I I
| 03 | PA | SATELLITE/AHMET INCENDIARY (ALLEGHENY COUNT] N (INACTIVE WASTE MANAGEMENT FACILITY (FIRE/EXPLOSION (DISPOSAL
I I
I I
I I
I I
I I
I I
I I
I I
I I
I I
(ORGANIZED MATERIALS
(NEUTRALIZED MATERIALS
(SECURITY
(SAMPLING, ANALYSIS
I
|$ 425|
I I
I I
I I
I I
I I
NOTE: NON-NPL SITE AT INITIATION OF REMOVAL. HOWEVER, CURRENTLY ON PROPOSED OR FINAL NPL.
-------
SUPERFUND EMERGENCY RESPONSE ACTIONS
HISTORICAL
|RG|ST| NAME | LOCATION
III 1
|03|PA|STARBRICK |CONEWANGO TWP
III 1
III 1
III 1
03|PA|SUNSET GOLF COURSE |HARRISBURG
III 1
III 1
III .1
03 | PA | TAYLOR BOROUGH DUMP (TAYLOR BOROUGH
1 1 1
1 1 1
1 1 1
1 1 1
1 1 1
II 1
1 1 1
1 I 1
NPL| INCIDENT | THREATS
| CATEGORY |
N | OTHER (DRINKING WATER CONTAMINATION
| [DIRECT CONTACT
I [GROUNDWATER CONTAMINATION
1 1
N [INACTIVE WASTE MANAGEMENT FACILITY|DRINKING WATER CONTAMINATION
[GROUNDWATER CONTAMINATION
[SOIL CONTAMINATION
1
Y INACTIVE WASTE MANAGEMENT FACILITY |DIRECT CONTACT
[FIRE/EXPLOSION
[AIR CONTAMINATION
[SOIL CONTAMINATION
1
1
1
1
1
| MITIGATIVE ACTIONS
1
[SAMPLING, ANALYSIS
1
1
1
[WATER SUPPLIED
[RESTORATION
[SAMPLING, ANALYSIS
1
[DISPOSAL
[REPACKED DRUMS
[ORGANIZED MATERIALS
[MIGRATION CONTROL ""
[EXCAVATION
[SECURITY
[RESTORATION
[SAMPLING, ANALYSIS
1
COST |
$(000) |
$ 681 1
I
I
I
$ 9|
I
I
I
$ 416|
I
I
I
I
I
I
I
I
-------
SUPERFUND EMERGENCY RESPONSE ACTIONS
HISTORICAL
|RG|ST| NAME | LOCATION
Ml 1
| 03 | PA | THORN RUN SPILL [CORAOPOLIS
III 1
III 1
III 1
III 1
III 1
III 1
NPL| INCIDENT
| CATEGORY
N (TRANSPORTATION-RELATED
1
1
1
1
1
1
| THREATS
1
[DIRECT CONTACT
[AIR CONTAMINATION
[SURFACE WATER CONTAMINATION
[ECOLOGICAL DAMAGE
1
1
1
| MITIGATIVE ACTIONS
1
[DISPOSAL
[REPACKED DRUMS
[ORGANIZED MATERIALS
| COST |
[$(000) |
|$
1
1
0|
1
1
[CONTAMINANT CONTAINMENT/RETENTION] |
[EXCAVATION
[SECURITY
1
1
1
1
1
1
1
|03|PA|TINICUM MARSH
1 1
1 1
1 1
1 1
1 1
1 1
1 1
| FOLCROFT
1
1
1
1
1
1
1
N [INACTIVE WASTE MANAGEMENT FACILITY [DIRECT CONTACT
| [SURFACE WATER CONTAMINATION
| [SOIL CONTAMINATION
1 1
1 1
1 1
1 1
1 1
[DISPOSAL |$ 55 |
[REPACKED DRUMS |
[CAPPED |
(EXCAVATION |
[SECURITY |
[RESTORATION |
| SAMPLING, ANALYSIS |
1 1
|03|PA|TRI-STATE ENGINEERING [WASHINGTON CTY
III 1
III 1
III 1
III 1
N [INACTIVE PRODUCTION FACILITY [DIRECT CONTACT
| [FIRE/EXPLOSION
1 1
1 1
1 1
[DISPOSAL
[REPACKED DRUMS
[SECURITY
[SAMPLING.ANALYSIS
1
|$ 338 |
1 1
1 1
1 1
1 1
-------
SUPERFUND EMERGENCY RESPONSE ACTIONS
HISTORICAL
|RG|ST| NAME LOCATION
1 I 1
|03|PA|TURCO COATINGS |PHOENIXVILLE
1 1
1 1
1 1
1 1
1 1
1 1
1 1
|03|PA|TYSONS DUMP [UPPER MERION
1 1 1
1 1 1
III
1 1 1
1 1 1
| 03 | PA | VULCAN I ZED RUBBER & PLASTICS (MORRISVILLE
1 1
1 1
1 1
1 I-
1 1
1 1
1 1
|NPL|
N | INACTIVE
1
1
1
1
1
Y [INACTIVE
1
1
1
1
N [INACTIVE
INCIDENT | THREATS
CATEGORY |
PRODUCTION FACILITY [DIRECT CONTACT
[FIRE/EXPLOSION
[SOIL CONTAMINATION
1
1
1
1
1
WASTE MANAGEMENT FACILITY [DIRECT CONTACT
[AIR CONTAMINATION
[SURFACE WATER CONTAMINATION
[SOIL CONTAMINATION
(ECOLOGICAL DAMAGE
1
PRODUCTION FACILITY [DIRECT CONTACT
IFIRE/EXPLOSION
[DRINKING WATER CONTAMINATION
[SURFACE WATER CONTAMINATION
[GROUNDWATER CONTAMINATION
[SOIL CONTAMINATION
[ECOLOGICAL DAMAGE
1
| MITIGATIVE ACTIONS | COST
| |*(000)
[DISPOSAL |$ 223
[REPACKED DRUMS
[ORGANIZED MATERIALS
[BULKED MATERIALS
[EXCAVATION
[SECURITY
[SAMPLING, ANALYSIS
1 1
(CAPPED |$ 265 |
[MIGRATION CONTROL |
[SECURITY |
(RESTORATION |
[SAMPLING, ANALYSIS |
1 1
[DISPOSAL |$ 40 j
(PUMPED OUT CONTAMINANTS
(SOLIDIFIED MATERIALS
[BULKED MATERIALS
[EXCAVATION
(SECURITY
(SAMPLING, ANALYSIS
1
-------
SUPERFUND EMERGENCY RESPONSE ACTIONS
HISTORICAL
RG|ST| NAME LOCATION
03|PA|WADE (ABM) (CHESTER
1
1
1
1
1
1
1
|03|PA|WESTINGHOUSE ELEVATOR CO. [GETTYSBURG
III 1
1 1 I
1 1
1 1
1
|03|PA|UESTLINE SITE [WESTLINE
1
1
1
1
1
1
1
1
NPL| INCIDENT | THREATS | MITIGATIVE ACTIONS COST
| CATEGORY | | |$(000)|
Y INACTIVE WASTE MANAGEMENT FACILITY] FIRE/EXPLOSION (DISPOSAL |$ 260|
[AIR CONTAMINATION [REPACKED DRUMS | |
[GROUNDWATER CONTAMINATION [ORGANIZED MATERIALS | |
|SOIL CONTAMINATION JBULKED MATERIALS | |
[ECOLOGICAL DAMAGE [MIGRATION CONTROL |
[SURFACE WATER CONTAMINATION [EXCAVATION
| [SAMPLING, ANALYSIS
1 1
N*| INACTIVE WASTE MANAGEMENT FACILITY|DIRECT CONTACT [SAMPLING.ANALYSIS |$ 43
| [FIRE/EXPLOSION |
| [DRINKING WATER CONTAMINATION |
| | GROUNDWATER CONTAMINATION |
(SOIL CONTAMINATION |
1
Y [INACTIVE PRODUCTION FACILITY [DIRECT CONTACT [DISPOSAL |$ 342
[FIRE/EXPLOSION [CAPPED
[DRINKING WATER CONTAMINATION [MIGRATION CONTROL
| [AIR CONTAMINATION |EXCAVATION
| (SOIL CONTAMINATION [SECURITY
| [SURFACE WATER CONTAMINATION [RESTORATION
[ | GROUNDWATER CONTAMINATION |
| [ECOLOGICAL DAMAGE |
1 1
MOTE: NOM-NPL SITE AT INITIATION OF REMOVAL. HOWEVER, CURRENTLY OH PROPOSED OR FINAL HPL.
-------
SUPERFUND EMERGENCY RESPONSE ACTIONS
HISTORICAL
|RG|ST| NAME | LOCATION
III |
| 03 |VA| HAMPTON CYLINDERS SITE (HAMPTON
It i
1 1
1 1 1
Ml 1
III |
|03|VA|RHINEHART TIRE FIRE DUMP (FREDERICK CTY
II |
1 1
II i
1 1
It i
1 1
III
1 1 1
1 1 1
NPL| INCIDENT
| CATEGORY
N (OTHER
1
1
1
1
N*| INACTIVE WASTE MANAGEMENT
1
1
1
1
1
1
| THREATS
1
(DIRECT CONTACT
(FIRE/EXPLOSION
(AIR CONTAMINATION
1
1
FACILITYJDIRECT CONTACT
(FIRE/EXPLOSION
(AIR CONTAMINATION
1
1
1
1
1 MITIGATIVE ACTIONS | COST |
1 |£<000)|
(DISPOSAL |$ 280 |
(ORGANIZED MATERIALS | |
(RELOCATION/EVACUATION | |
(SAMPLING, ANALYSIS | |
1 1 1
(DISPOSAL |$ H52|
(PUMPED OUT CONTAMINANTS | |
(EXTINGUISHED FIRE ( (
(CONTAMINANT CONTAINMENT/RETENTION | |
(RESTORATION ( |
(SAMPLING, ANALYSIS ( |
I I I
|03|VA|WALKERTON TIRE FIRE
(KING & QUEEN C0| N (ACTIVE WASTE MANAGEMENT FACILITY (AIR CONTAMINATION
I | | (SURFACE WATER CONTAMINATION
I | | IGROUNDWATER CONTAMINATION
|CONTAMINANT CONTAINMENT/RETENTION|$
[MIGRATION CONTROL I
0|
NOTE: NON-NPL SITE AT INITIATION OF REMOVAL. HOWEVER, CURRENTLY ON PROPOSED OR FINAL NPL.
-------
SUPERFUND EMERGENCY RESPONSE ACTIONS
HISTORICAL
1
1
1
1
|03|WV|BIG JOHN'S SALVAGE -HOULT ROAD | FAIRMONT
|03|WV|BITTLE WELL CONTAMINATION (CHARLES TOWN
III 1
III 1
III 1
1 1 1
1 1 1
| [SOIL CONTAMINATION
1 1
1
1
1
1
N (ACTIVE PRODUCTION FACILITY (DIRECT CONTACT
IFIRE/EXPLOSION
(AIR CONTAMINATION
(SURFACE WATER CONTAMINATION
(SOIL CONTAMINATION
1
N (OTHER (DIRECT CONTACT
(DRINKING WATER CONTAMINATION
(GROUND WATER CONTAMINATION
1
1
1
(CAPPED
(MIGRATION CONTROL
(EXCAVATION
(SECURITY
(SAMPLING, ANALYSIS
1
(DISPOSAL
(CONTAMINANT CONTAINMENT/RETENTION
(MIGRATION CONTROL
(EXCAVATION
(SAMPLING, ANALYSIS
1
(DISPOSAL
(CONTAMINANT CONTAINMENT/RETENTION
(MIGRATION CONTROL
(WATER SUPPLIED
(SAMPLING, ANALYSIS
1
$ 312|
I
I
I
I
$ 35 1
I
I
I
-------
SUPERFUND EMERGENCY RESPONSE ACTIONS
HISTORICAL
|RG|ST| NAME | LOCATION
III 1
| 03 |WV| CHESAPEAKE PCB SITE (CHESAPEAKE
II! 1
III 1
III 1
|NPL| INCIDENT
| CATEGORY
N (ACTIVE WASTE MANAGEMENT FACILITY
1
1
1
| THREATS | MITIGATIVE ACTIONS
1 |
(DIRECT CONTACT (SECURITY
(SOIL CONTAMINATION |
(SURFACE WATER CONTAMINATION |
1 1
! COST |
($(000) |
|$ 10|
I I
I I
I I
| 03 | WV ( CLARK PROPERTY
I I I
I I I
I I I
I I I
I I I
(KANAWHA COUNTY
I
I
I
I
I
N (INACTIVE PRODUCTION FACILITY
I
I
I
I
I
(DIRECT CONTACT
(FIRE/EXPLOSION
(AIR CONTAMINATION
I
I
I
(DISPOSAL
(BULKED MATERIALS
(REPACKED DRUMS
(EXCAVATION
| SAMPLING, ANALYSIS
I
|$ 1108|
1 1
1 1
1 1
1 1
1 1
| 03 |WV| COONS RUN
1 1 1
1 1 1
1 1 1
|03|WV|GREENBRIAR RIVER FLOOD
1 1 1
1 1 1
1 1 1
(ADAMSVILLE
1
1
1
(ALDERSON
1
1
1
N (INACTIVE WASTE MANAGEMENT
1
1
1
N (OTHER
1
1
1
FACILITY (DIRECT CONTACT
(SOIL CONTAMINATION
1
1
(DIRECT CONTACT
(DRINKING WATER CONTAMINATION
(SURFACE WATER CONTAMINATION
1
(DISPOSAL
(EXCAVATION
(SECURITY
1
(DISPOSAL
(ORGANIZED MATERIALS
(SAMPLING, ANALYSIS
1
|$
1
1
1
|$
1
1
1
109|
1
1
1
75 1
1
1
1
-------
SUPERFUND EMERGENCY RESPONSE ACTIONS
HISTORICAL
|RG
1
|03
!
ST | NAME
1
WV
HOLDER CORPORATION
LOCATION |NPL
1
ONA
03 |WV| INTERSTATE 70 ACID SPILL (WHEELING
1 1
1 1
1 1
1 1
1 1
N
"
INCIDENT | THREATS | MITIGATIVE ACTIONS | COST
CATEGORY | | |$(000)
ACTIVE PRODUCTION FACILITY (DIRECT CONTACT (DISPOSAL
(FIRE/EXPLOSION (REPACKED DRUMS
(DRINKING WATER CONTAMINATION (ORGANIZED MATERIALS
(AIR CONTAMINATION (BULKED MATERIALS
(DIRECT CONTACT (PUMPED OUT CONTAMINANTS
(SURFACE WATER CONTAMINATION (CAPPED
(SOIL CONTAMINATION (MIGRATION CONTROL
| ' (EXCAVATION
| (SECURITY
| (RESTORATION
| [SAMPLING, ANALYSIS
1 I
$ 678
TRANSPORTATION-RELATED (DIRECT CONTACT (DISPOSAL |$ 15
(AIR CONTAMINATION (ORGANIZED MATERIALS |
(SURFACE WATER CONTAMINATION (NEUTRALIZED MATERIALS |
| (REPACKED DRUMS |
| (MIGRATION CONTROL |
I I I
-------
SUPERFUND EMERGENCY RESPONSE ACTIONS
HISTORICAL
|RG|ST| NAME
1 1 1
| LOCATION |NPL|
1 1 1
INCIDENT
CATEGORY
| THREATS | MITIGATIVE ACTIONS | COST |
| | |S(000)|
|03|WV|KNAPP CREEK
ill
I I I
III
I I I
IPOCOHONTAS co. N [OTHER
(DIRECT CONTACT
JSURFACE WATER CONTAMINATION
[DISPOSAL
[REPACKED DRUMS
[ORGANIZED MATERIALS
[SAMPLING,ANALYSIS
0|
|03|WV|LEETOWN PESTICIDE [LEETOWN
1 1 1
II 1
1 1 1
1 1 1
1 1 1
| 03 |UV| MANILLA CREEK [POCA
1 1
1 1 1
1 1
1 1
1 1
Y (MIDNIGHT DUMP [DIRECT CONTACT
[ [DRINKING WATER CONTAMINATION
| [SURFACE WATER CONTAMINATION
[ (GROUNDWATER CONTAMINATION
| (ECOLOGICAL DAMAGE
1 i
fl (MIDNIGHT DUMP [DIRECT CONTACT
| {AIR CONTAMINATION
| [SURFACE WATER CONTAMINATION
| [SOIL CONTAMINATION
1 1
1 1
(DISPOSAL |$ 1]
(EXCAVATION | |
(SECURITY | |
(SAMPLING, ANALYSIS | |
I I I
I II
[DISPOSAL |$. 88 1
[REPACKED DRUMS | |
[MIGRATION CONTROL | |
[EXCAVATION | |
[SECURITY | |
I I I
-------
SUPERFUND EMERGENCY RESPONSE ACTIONS
HISTORICAL
|RG|ST| NAME | LOCATION
Ml 1
|03|WV|RICHARDSON PROPERTY [HUNTINGTON
ill 1
Ml 1
Ml 1
Ml 1
III 1
|03|WV|SEMCO PCB SITE [CHESAPEAKE
Ml I
M 1 1
M 1 I
M 1 1
Ml 1
M 1 1
M 1 1
|03|WV|STONEHAN PROPERTY | TYLER COUNTY
M 1 1
III 1
Ml 1
Ml 1
NPL| INCIDENT
CATEGORY
N [MIDNIGHT DUMP
1
1
1
1
1
N (INACTIVE WASTE MANAGEMENT
N j MIDNIGHT DUMP
1
| THREATS
1
[DIRECT CONTACT
[FIRE/EXPLOSION
[SOIL CONTAMINATION
1
1
1
FACILITY|DIRECT CONTACT
[DRINKING WATER CONTAMINATION
[SOIL CONTAMINATION
[GROUNDWATER CONTAMINATION
[SURFACE WATER CONTAMINATION
1
1
1
[DIRECT CONTACT
[FIRE/EXPLOSION
[SOIL CONTAMINATION
1
1
| MITIGATIVE ACTIONS
1
[DISPOSAL
[REPACKED DRUMS
[EXCAVATION
[SECURITY
[SAMPLING, ANALYSIS
1
[DISPOSAL
[ORGANIZED MATERIALS
[MIGRATION CONTROL
[EXCAVATION
[SECURITY
[RESTORATION
[SAMPLING, ANALYSIS
1
[DISPOSAL
[REPACKED DRUMS
[EXCAVATION
[SAMPLING, ANALYSIS
1
| COST |
[$(000) |
|$ 44 1
1 1
1 1
1 1
1 1
1 1
|$ 142|
1 1
1 1
1 1
1 1
1 1
1 1
1 1
|$ 5|
1 1
1 1
1 1
1 1
-------
SUPERFUNO EMERGENCY RESPONSE ACTIONS
HISTORICAL
|RG|ST| NAME | LOCATION |NPL| INCIDENT
III | || CATEGORY
| 03 |WV| WALTER TAYLOR (NITRO
III 1
III 1
III 1
III 1
III 1
1 03 |WV| WHEEL ING HILL [WHEELING
II 1 1
III 1
III 1
|03|WV|YOKUM CHLORDANE CONTAMINATION [PETERSBURG
II 1 1
M 1 1
Ml 1
N [MIDNIGHT DUMP
1
1
1
1
1
N [TRANSPORTATION-RELATED
1
1
1
N [MIDNIGHT DUMP
1
1
1
| THREATS
| MITIGATIVE ACTIONS
| COST (
| | ($(000) |
[DIRECT CONTACT
[FIRE/EXPLOSION
[AIR CONTAMINATION
[SOIL CONTAMINATION
1
1
(DIRECT CONTACT
1
1
1
(DRINKING WATER CONTAMINATION
| GROUNDWATER CONTAMINATION
1
1
(DISPOSAL
(REPACKED DRUMS
(ORGANIZED MATERIALS
(EXCAVATION
(SAMPLING, ANALYSIS
1
(DISPOSAL
(MIGRATION CONTROL
(SAMPLING, ANALYSIS
1
(DISPOSAL
(PUMPED OUT CONTAMINANTS
(SAMPLING, ANALYSIS
1
,$
1
1
1
1
1
|$
1
1
1
|$
1
1
1
16|
I
I
I
I
I
5|
I
I
I
18|
I
I
I
-------
-------
U. S. EPA REGION 4
For Information Contact:
Chief, Emergency and Remedial
Response Branch,
Waste Management Division
345 Courtland Street, N.E.
Atlanta, GA 30365
(404) 347-4097
-------
SUPERFUND EMERGENCY RESPONSE ACTIONS
HISTORICAL
|RG|ST| NAME | LOCATION |NPL| INCIDENT
Ml 1
|04|AL|CALLAHAN DRUM [PRATTVILLE
Ml 1
Ml 1
Ml 1
Ml 1
M 1 I
1 04 |AL| CHURCH OF GOD PROPERTY | MOODY
Ml 1
II 1 1
M 1 1
| 04 |AL| MCALLISTER DRUM SITE [ASHVILLE
Ml I
M 1 1
Ml I
M 1 1
|04|AL|MOWBRAY ENGINEERING CO. [GREENVILLE
Ml 1
Ml 1
M 1 1
| CATEGORY
N IMIDNIGHT DUMP
1
1
1
1
1
N IMIDNIGHT DUMP
1
1
1
N | INACTIVE PRODUCTION FACILITY
1
1
1
1
N* IMIDNIGHT DUMP
1
1
1
| THREATS
1
IDIRECT CONTACT
(DRINKING WATER CONTAMINATION
(SURFACE WATER CONTAMINATION
(SOIL CONTAMINATION
IGROUNDWATER CONTAMINATION
1
[DIRECT CONTACT
| SURFACE WATER CONTAMINATION
IGROUNDWATER CONTAMINATION
1
[DIRECT CONTACT
IGROUNDWATER CONTAMINATION
[SURFACE WATER CONTAMINATION
[SOIL CONTAMINATION
1
IGROUNDWATER CONTAMINATION
[SOIL CONTAMINATION
[ECOLOGICAL DAMAGE
1
| MITIGATIVE ACTIONS
1
[DISPOSAL
[MIGRATION CONTROL
|SAMPLING,ANALYSIS
1
1
1
[DISPOSAL
[EXCAVATION
[RESTORATION
1
[DISPOSAL
[BULKED MATERIALS
| COST |
|$(000)|
|$ 8|
1 1
1 1
1 1
1 1
1 1
|$ 397|
1 1
1 1
1 1
|$ 87[
1 1
[CONTAMINANT CONTAINMENT/RETENTION | |
[SAMPLING, ANALYSIS
1
[DISPOSAL
[SAMPLING, ANALYSIS
1
1
1 I
1 1
|$ 50|
1 1
1 1
1 1
NOTE: NON-NPL SITE AT INITIATION OF REMOVAL. HOWEVER, CURRENTLY ON PROPOSED OR FINAL NPL.
-------
SUPERFUND EMERGENCY RESPONSE ACTIONS
HISTORICAL
|RG|ST| NAME | LOCATION
III 1
(04 |AL| NEWFOUND ROAD |MT. OLIVE
II 1 1
III 1
III 1
III 1
|04|AL|PETRO CHEMICAL [ATHENS
III 1
III 1
III 1
III 1
III 1
| 04 |FL| ABANDONED DRUM-CG |FORT PIERCE
III 1
III 1
III 1
NPL| INCIDENT | THREATS
| CATEGORY |
N [MIDNIGHT DUMP [DIRECT CONTACT
[AIR CONTAMINATION
1
1
1
N INACTIVE PRODUCTION FACILITY [DIRECT CONTACT
[FIRE/EXPLOSION
[AIR CONTAMINATION
IGROUNDWATER CONTAMINATION
[SOIL CONTAMINATION
1
N [MIDNIGHT DUMP [DIRECT CONTACT
(SOIL CONTAMINATION
1
1
| MITIGATIVE ACTIONS | COST |
| |$(000)|
[DISPOSAL |$ 455 |
(REPACKED DRUMS | |
[EXCAVATION | |
[SAMPLING, ANALYSIS | |
1 1 1
(DISPOSAL |$ 176|
[EXCAVATION |
[SAMPLING, ANALYSIS |
I I
I I
I I
[DISPOSAL |$ 2|
[REPACKED DRUMS | |
(SAMPLING, ANALYSIS | |
I I I
|04|FL|ABANDONED DRUM/HILLSBOROUGH-CG [TAMPA
N (MIDNIGHT DUMP
[DIRECT CONTACT [DISPOSAL
(FIRE/EXPLOSION [REPACKED DRUMS
(AIR CONTAMINATION (MIGRATION CONTROL
(DRINKING WATER CONTAMINATION (EXCAVATION
(SOIL CONTAMINATION
(SURFACE WATER CONTAMINATION
|SAMPLING,ANALYSIS
|$
-------
SUPERFUND EMERGENCY RESPONSE ACTIONS
HISTORICAL
|RG|ST| NAME | LOCATION |NPL| INCIDENT THREATS | HITIGATIVE ACTIONS
1
1
|04|FL|ABANDONED DRUH/HARATHON-CG (MARATHON KEY
1 1
1
|04|FL (AMERICAN CREOSOTE/PENSACOLA (PENSACOLA
04 |FL| BEACHED DRUM-CG | COCOA BEACH
II
1
1
1 1 1
COST |
CATEGORY | | |$(000)|
N (MIDNIGHT DUMP (DIRECT CONTACT [DISPOSAL |$ 4|
(SOIL CONTAMINATION (REPACKED DRUMS | |
I (SAMPLING, ANALYSIS | (
1 1 1 II
Y (INACTIVE PRODUCTION FACILITY [DIRECT CONTACT (DISPOSAL |$ 781 |
(AIR CONTAMINATION (CONTAMINANT CONTAINMENT/RETENTION | |
(SURFACE WATER CONTAMINATION (CAPPED
(GROUNDWATER CONTAMINATION (PUMPED OUT CONTAMINANTS
(SOIL CONTAMINATION (SOLIDIFIED MATERIALS
[MIGRATION CONTROL
(EXCAVATION
(SECURITY
[RESTORATION
| SAMPLING, ANALYSIS
I
I
I
I
I
I
I
I
I
I
N (MIDNIGHT DUMP (SURFACE WATER CONTAMINATION (DISPOSAL |$ 1|
I (SOIL CONTAMINATION | | |
' I I II
-------
SUPERFUND EMERGENCY RESPONSE ACTIONS
HISTORICAL
|RG|ST| NAME
1 1
|04|FL|CITY INDUSTRIES INC.
1 1 1
1 1 "1
III
I I' 1
1 1 1
| 04 |FL|COLEMAN- EVANS WOOD PRES CO
| |
1 1
1 1
1 1
1 .1
1 1
| LOCATION |NPL| INCIDENT | THREATS
| || CATEGORY |
(ORLANDO | N*| INACTIVE WASTE MANAGEMENT FACILITY (DIRECT CONTACT
I II IFIRE/EXPLOSION
| | (DRINKING WATER CONTAMINATION
I | | (GROUNDWATER CONTAMINATION
| | | (SOIL CONTAMINATION
-.11 1
(WHITEHOUSE | Y (ACTIVE PRODUCTION FACILITY (DIRECT CONTACT
| (DRINKING WATER CONTAMINATION
( IGROUNDWATER CONTAMINATION
' ' 1 1
1 1
1 1
1 1
1 04*| FL| CREOSOTE TANKS RELEASE (TALLEYRAND)] JACKSONVILLE | N |INACTIVE PRODUCTION FACILITY (DIRECT CONTACT
1 1 1
III
| | | (SURFACE WATER CONTAMINATION
II 1
| MITIGATIVE ACTIONS | COST
| ($(000) |
(DISPOSAL |$ 435 |
(SOLIDIFIED MATERIALS
(MIGRATION CONTROL
(EXCAVATION
(SAMPLING, ANALYSIS
1
(DISPOSAL I* 325 |
(WATER SUPPLIED
(EXCAVATION
(SECURITY
(RESTORATION
(SAMPLING, ANALYSIS
1
j SAMPLING, ANALYSIS |$ 50
(SOLIDIFIED MATERIALS
1 II
* NOTE: NON-NPL SITE AT INITIATION OF REMOVAL. HOWEVER, CURRENTLY ON PROPOSED OR FINAL NPL.
-------
SUPERFUND EMERGENCY RESPONSE ACTIONS
HISTORICAL
|RG|ST| NAME
1 1 1
|04|FL|HIPPS ROAD LANDFILL
II i
1 1
1 1
1 1 1
|04|FL|LAKE WORTH INLET-CG
I 1 1
1 1 1
1 1
|04|FL|LUMMIS ISLAND-CG
1 l l
1 1 1
1 1
1 1
|04|FL|PCB MIDNIGHT DUMP
1 1 1
1 1 1
1 1
1 1
1 1 1
| LOCATION |NPL| INCIDENT
1 | I CATEGORY
IDUVAL COUNTY | Y | INACTIVE WASTE MANAGEMENT
1 1 1
1 1 1
1 1 1
ILAKE WORTH INLE| N (MIDNIGHT DUMP
1 1
1 1
|PORT OF MIAMI N (TRANSPORTATION-RELATED
1
1 1
1 1
IBALDWIN N (MIDNIGHT DUMP
1
1 1
1 1 1
1 1 !
| THREATS
1
FACILITY (DIRECT CONTACT
(DRINKING WATER CONTAMINATION
IGROUNDWATER CONTAMINATION
1
IDIRECT CONTACT
(SURFACE WATER CONTAMINATION
1
(DIRECT CONTACT
1
1
1
(DIRECT CONTACT
(SOIL CONTAMINATION
(SURFACE WATER CONTAMINATION
1
1
| MITIGATIVE ACTIONS | COST |
1 ($(000) |
(WATER SUPPLIED |$ 95 1
(RESTORATION |
ISAMPLING, ANALYSIS |
1 i 1
(DISPOSAL |$ 2|
(SAMPLING, ANALYSIS | |
1 1 1
(MIGRATION CONTROL |$ 25 |
(SECURITY |
(SAMPLING.ANALYSIS |
1 1
(DISPOSAL $ 36|
(PUMPED OUT CONTAMINANTS |
(EXCAVATION |
(SAMPLING, ANALYSIS |
1 1
-------
SUPERFUND EMERGENCY RESPONSE ACTIONS
HISTORICAL
|RG|ST| NAME
LOCATION |NPL|
INCIDENT
CATEGORY
THREATS
MITIGATIVE ACTIONS
| COST |
|$(000)|
|04|FL| PEMBROKE PINES | HOLLYWOOD
1 1 1
II 1
1 1 1
II 1 1
III 1
|04|FL|PEPPER STEEL & ALLOYS, INC. (MEDLEY
II 1
1 1 1
1 1 1
1 1 1
1 1 1
1 1 1
| 04 |FL| PETROLEUM PRODUCTS (PEMBROKE RD) |HALLANDALE
1 1 1
1 1 1
1 1 1
II '1
1 1 1
1 1 1
N IMIDNIGHT DUMP [DRINKING WATER CONTAMINATION
IDIRECT CONTACT
IGROUNDWATER CONTAMINATION
| SURFACE WATER CONTAMINATION
| (SOIL CONTAMINATION
1 1
N*|ACTIVE PRODUCTION FACILITY [DIRECT CONTACT
[SOIL CONTAMINATION
N [INACTIVE PRODUCTION FACILITY [DIRECT CONTACT
| (FIRE/EXPLOSION
j [DRINKING WATER CONTAMINATION
[SURFACE WATER CONTAMINATION
[SOIL CONTAMINATION
IGROUNDWATER CONTAMINATION
(DISPOSAL
1
1
I
1
1
[DISPOSAL
[PUMPED OUT CONTAMINANTS
[MIGRATION CONTROL
[EXCAVATION
[RESTORATION
[SAMPLING, ANALYSIS
1
[SAMPLING, ANALYSIS
1
1
1
1
1
1
$ 20 1
$ 233|
1
1 , 1
I*' 5|
* NOTE: NON-NPL SITE AT INITIATION OF REMOVAL. HOWEVER, CURRENTLY ON PROPOSED OR FINAL NPL.
-------
SUPERFUND EMERGENCY RESPONSE ACTIONS
HISTORICAL
|RG|ST| NAME
1 1 1
1 04 |FL| PIONEER SAND CO
1 1 1
1 1 1
|04|FL|SAND KEY-CG
I 1
1 1 1
1 1 !
| 04 |FL| SNAPPER LANE-CG
1 1
1 1
1 1 1
|04|FL|ST. JOHN RIVER-CG
1 1
III.
1 1
| LOCATION |NPL| INCIDENT
| | | CATEGORY
IWARRINGTON
1
1
IBISCAYNE BAY
1
1
1
IKEY LARGO
1
1
1
[JACKSONVILLE
1
1
1
Y (OTHER
1
1
N [MIDNIGHT DUMP
1
I
1
N IMIDNIGHT DUMP
1
I
1
N IMIDNIGHT DUMP
1
1
I
| THREATS
1
IGROUNDWATER CONTAMINATION
1
1-
(DIRECT CONTACT
[SOIL CONTAMINATION
I
1
(SURFACE WATER CONTAMINATION
1
1
(DIRECT CONTACT
(SURFACE WATER CONTAMINATION
1
1
| MITIGATIVE ACTIONS
1
(DISPOSAL -
| EXCAVATION '
1
(DISPOSAL
(REPACKED DRUMS
(SAMPLING ANALYSIS
1*
(DISPOSAL
(REPACKED DRUMS
|SAMPLING,ANALYSIS
1
(DISPOSAL
(REPACKED DRUMS
|SAMPLING,ANALYSIS
1
| COST
($(000)
|$ 9
1
1 1
|$ 1|
I
I
I I
|$ 3|
I
I
I
|$ 11
|
I
I
-------
SUPERFUND EMERGENCY RESPONSE ACTIONS
HISTORICAL
|RG|ST| NAME
1 1 1
| LOCATION |NPL|
1 1 1
INCIDENT
CATEGORY
| THREATS | MITIGATIVE ACTIONS | COST |
| | |$(000)|
|04|FL|TOWER CHEMICAL CO.
ICLERMONT
Y (INACTIVE PRODUCTION FACILITY
[DIRECT CONTACT
(SURFACE WATER CONTAMINATION
IGROUNDUATER CONTAMINATION
[SOIL CONTAMINATION
|ECOLOGICAL DAMAGE
I
I
(DISPOSAL |$ 758|
(CONTAMINANT CONTAINMENT/RETENTION|
(CAPPED
(EXCAVATION
(SECURITY
(RESTORATION
|04|FL|TRI-CITY OIL CONSERVATIONIST, INC (TAMPA
I I I I
Y (INACTIVE PRODUCTION FACILITY
(DRINKING WATER CONTAMINATION (DISPOSAL
IGROUNDUATER CONTAMINATION (EXCAVATION
(SOIL CONTAMINATION (RESTORATION
ISURFACE WATER CONTAMINATION |
|$ 421
I I
I I
I I
(04 |FL (UNKNOWN CHEMICAL DISCHARGE-CG (TAMPA
111 1
III 1
III 1
|04|FL|WHITEHOUSE OIL PITS (WHITEHOUSE
III 1
Ml 1
III 1
N (ACTIVE PRODUCTION FACILITY (DIRECT CONTACT
Y
(SURFACE WATER CONTAMINATION
(SOIL CONTAMINATION
1
INACTIVE PRODUCTION FACILITY (GROUNDWATER CONTAMINATION
[SOIL CONTAMINATION
1
1
(MIGRATION CONTROL
(SECURITY
(SAMPLING, ANALYSIS
1
(CAPPED
(MIGRATION CONTROL
(RESTORATION
1
|$ 4|
1 1
1 1
1 1
|$ 45 1
1 1
1 1
1 1
-------
SUPERFUND EMERGENCY RESPONSE ACTIONS
HISTORICAL
|RG|ST| NAME LOCATION |NPL| INCIDENT 1 THREATS
I'
CATEGORY |
|04|FL|WILLIAMS PESTICIDE SITE |ST. JOHNS COUNT| N [ACTIVE PRODUCTION FACILITY [DIRECT CONTACT
1 1 |
1
1 1
| 04 |FL| YELLOW WATER ROAD DUMP | BALDWIN
1
1
.
1
i 04 |GA| BARROW COUNTY DRUM SITE [BARROW COUNTY
1 ,
1 1
1 1 i
1 1 i
1 1 1
[SURFACE WATER CONTAMINATION
1 [GROUNDWATER CONTAMINATION
1 [SOIL CONTAMINATION
1
N*|INACTIVE WASTE MANAGEMENT FACILITY [DIRECT CONTACT
[DRINKING WATER CONTAMINATION
[SURFACE WATER CONTAMINATION
[GROUNDWATER CONTAMINATION
[SOIL CONTAMINATION
[ECOLOGICAL DAMAGE
1
N [MIDNIGHT DUMP [DIRECT CONTACT
1
1
1 1
| MITIGATIVE ACTIONS
1
[DISPOSAL
[REPACKED DRUMS
[SAMPLING.ANALYSIS
1
1
| COST
|$(000)
|$ 11|
| [
I
|
I
[CONTAMINANT CONTAINMENT/RETENTION |$ 515 1
[ORGANIZED MATERIALS
[EXCAVATION
[SECURITY
|SAMPLING,ANALYSIS
I
I
[DISPOSAL
[REPACKED DRUMS
|SAMPLING,ANALYSIS
I
I
I
I
I
I
I
|$ 5|
I I
| |
I I
NOTE: NON-NPL SITE AT INITIATION OF REMOVAL. HOWEVER, CURRENTLY ON PROPOSED OR FINAL NPL.
-------
SUPERFUND EMERGENCY RESPONSE ACTIONS
HISTORICAL
|RG|ST| NAME | LOCATION
Ml 1
|04|GA|BERRIEN PRODUCTS [NASHVILLE
III 1
III 1
III 1
III 1
|04|GA|BUFORD HIGHWAY |DORAVILLE
III 1
III 1
III 1
III 1
| 04 |GA| CASCADE ROAD [ATLANTA
III 1
III 1
III 1
III 1
|04|GA|CATOOSA COUNTY LABPACK |FT. OGLETHORPE
III 1
III 1
Ml 1
Ml 1
Ml 1
NPL| INCIDENT | THREATS
| CATEGORY |
N [INACTIVE PRODUCTION FACILITY [DIRECT CONTACT
| [AIR CONTAMINATION
| JGROUNDWATER CONTAMINATION
1 1
1 1
N [MIDNIGHT DUMP [DIRECT CONTACT
1 1
1 1
1 1
1 1
N [MIDNIGHT DUMP [DIRECT CONTACT
| [FIRE/EXPLOSION
| [SURFACE WATER CONTAMINATION
1 1
1 1
N [MIDNIGHT DUMP [DIRECT CONTACT
1 1
1 1
1 1
1 1
1 1
| MITIGATIVE ACTIONS
1
[DISPOSAL
[REPACKED DRUMS
[EXCAVATION
[SAMPLING, ANALYSIS
1
[DISPOSAL
(REPACKED DRUMS
[SOLIDIFIED MATERIALS
[SAMPLING, ANALYSIS
1
[DISPOSAL
[ORGANIZED MATERIALS
[EXCAVATION
[SAMPLING, ANALYSIS
1
[DISPOSAL
(BULKED MATERIALS
(REPACKED DRUMS
(SOLIDIFIED MATERIALS
[SAMPLING.ANALYSIS
1
| COST |
|$<000)|
|$ 65 1
1 1
1 1
1 1
1 1
|$ 5|
1 1
1 1
1 1
1 1
|$ 35 1
1 1
1 1
1 1
1 1
|$ 4|
1
1
1
1
1
-------
SUPERFUND EMERGENCY RESPONSE ACTIONS
HISTORICAL
|RG|ST| NAME | LOCATION
Ml 1
| 04 |GA| DAVIS FARM (NICKELSVILLE
III I
Ml ' . 1
Ml I
Ml 1
Ml 1
Ml I
Ml 1
| 04 |GA| EASTERN CHEMICAL CO. (LITHONIA
Ml I
|04(GA(FT. OGLETHORPE DRUM (FT. OGLETHORPE
Ml 1
III 1
Ml I
III 1
1 1 1 I
NPL| INCIDENT | THREATS
| CATEGORY |
N [INACTIVE WASTE MANAGEMENT FACILITY|DRINKING WATER CONTAMINATION
| (SURFACE WATER CONTAMINATION
| (GROUNDWATER CONTAMINATION
1 1
1 1
1 1
1 1
1 1
N [OTHER (DIRECT CONTACT
1 1
N [MIDNIGHT DUMP [DIRECT CONTACT
| [DRINKING WATER CONTAMINATION
| [SURFACE WATER CONTAMINATION
1 1
1 1
1 1
| MITIGATIVE ACTIONS
1
[DISPOSAL
[BULKED MATERIALS
(MIGRATION CONTROL
(EXCAVATION
[SECURITY
(RESTORATION
[SAMPLING, ANALYSIS
1
[SECURITY
1
[DISPOSAL
[REPACKED DRUMS
(ORGANIZED MATERIALS
(SECURITY
|SAMPLING,ANALYSIS
1
| COST |
[$(000) |
|$ 740|
1 1
1 1
1 1
1 1
1 1
1 1
1 1
|$ 1|
I I
|$ 6|
I I
I I
I I
I I
I I
-------
SUPERFUND EMERGENCY RESPONSE ACTIONS
HISTORICAL
|RG|ST| NAME
1 1 1
|04|GAlGAIL FOSTER PROPERTY
I 1 1
II!
1 1 1
| 04 |GA| GEORGIA HIGHWAY 138
III
III
I I I
III
1 04 1 GA | HAD AWAY ROAD
III
I I I
I I I
1 04 1 GA | HEAD PCB SPILL
III
| LOCATION |NPL| INCIDENT
| | | CATEGORY
IWADLEY | N [MIDNIGHT DUMP
I II
I I I
I II
ICLAYTON COUNTY | 'N (MIDNIGHT DUMP
I I I
I II
I I I
I II
[KENNESAW | N IMIDNIGHT DUMP
I II
I I I
I II
[COMMERCE | N [MIDNIGHT DUMP
I -II
| THREATS
I
[DIRECT CONTACT
[SURFACE WATER CONTAMINATION
I
I
- [DIRECT CONTACT
I
I
I
I
[DIRECT CONTACT
[FIRE/EXPLOSION
I
I
[DIRECT CONTACT
[SURFACE WATER CONTAMINATION
| MITIGATIVE ACTIONS
I
[DISPOSAL
[REPACKED DRUMS
[SOLIDIFIED MATERIALS
I
[DISPOSAL
[REPACKED DRUMS
[SOLIDIFIED MATERIALS
| SAMPLING, ANALYSIS
I
[DISPOSAL
[REPACKED DRUMS
| SAMPLING .ANALYSIS
I
[DISPOSAL
[EXCAVATION
| COST |
|$<000)|
|$ 3|
I I
I I
I I
|$ 6|
I I
I I
I I
I ' I
|$ 3|
I I
I I
I I
|$ 20 1
I I
I I I
[SOIL CONTAMINATION
|SAMPLING,ANALYSIS
-------
SUPERFUND EMERGENCY RESPONSE ACTIONS
HISTORICAL
|RG|ST| NAME | LOCATION
1 1 1
|04|GA|IVY ROAD (BESSIE RUNNER) (ATLANTA
'II 1
1 1 1
1 1 1
1 1 I I
| 04 |GA| JOHNSON PROPERTY SITE |STOCKBRIDGE
1 1 1
1 1 1
1 1 1
1 1 1
1 1 1
I 1 1
1 1 1
|04|GA|LAKE KATHY ROAD SPILL (DALTON
1 1 1 1
Ml 1
Ml I
NPL| INCIDENT | THREATS
CATEGORY |
N IHIDNIGHT DUMP (DIRECT CONTACT
1
1 1
1 1
1 1
N IMIDNIGHT DUMP [DIRECT CONTACT
IDRINKING WATER CONTAMINATION
JSURFACE WATER CONTAMINATION
JSOIL CONTAMINATION
1
1
1
1
N [MIDNIGHT DUMP (DIRECT CONTACT
I [FIRE/EXPLOSION
| (SOIL CONTAMINATION
1 1
| MITIGATIVE ACTIONS
1
(DISPOSAL
[ORGANIZED MATERIALS
[BULKED MATERIALS
[SAMPLING, ANALYSIS
1
(DISPOSAL
[ORGANIZED MATERIALS
[SOLIDIFIED MATERIALS
[EXCAVATION
[SECURITY
[RESTORATION
[SAMPLING.ANALYSIS
1
(DISPOSAL
(EXCAVATION
|SAMPLING,ANALYSIS
1
| COST |
[$(000) |
|$ 15|
1 1
1 1
1 I
1 1
|$ 50|
1 1
1 1
1 1
1 1
1 1
1 1
1 1
|$ 13|
I I
I I
I I
-------
SUPERFUND EMERGENCY RESPONSE ACTIONS
HISTORICAL
|R6|ST| NAME | LOCATION
III 1
|04|GA|MARIETTA ROAD | ATLANTA
III 1
III 1
III 1
III 1
|04|GA|MARZONE CHEMICAL CO. JTIFTON
III 1
III 1
III 1
III 1
III 1
III 1
| 04 |GA| NASHVILLE PESTICIDE SITE [NASHVILLE
1 1 1
1 1 1
1 1 1
1 1 1
1 1 1
NPL| INCIDENT | THREATS
| CATEGORY |
N (MIDNIGHT DUMP |SOIL CONTAMINATION
|
1
1
|
N INACTIVE PRODUCTION FACILITY (DIRECT CONTACT
(FOOD CHAIN CONTAMINATION
(AIR CONTAMINATION
(GROUNDWATER CONTAMINATION
1
1
1
N (MIDNIGHT DUMP (DIRECT CONTACT
| |AIR CONTAMINATION
| [SURFACE WATER CONTAMINATION
! (GROUNDWATER CONTAMINATION
(SOIL CONTAMINATION
1
| MITIGATIVE ACTIONS
1
(DISPOSAL
(REPACKED DRUMS
(ORGANIZED MATERIALS
[SAMPLING, ANALYSIS
1
(DISPOSAL
(ORGANIZED MATERIALS
(EXCAVATION
(SECURITY
(RESTORATION
(SAMPLING, ANALYSIS
1
(DISPOSAL
(BULKED MATERIALS
(EXCAVATION
(RESTORATION
1
1
| COST |
|*<000>|
|$ 6|
1 1
1 1
1 1
1 1
|$ 376|
1
1
1
1
1
1
|$ 225 |
1 1
1 1
1 1
1 1
1 1
-------
SUPERFUND EMERGENCY RESPONSE ACTIONS
HISTORICAL
|RG|ST| NAME
I 1 1
|04|GA|OLD LARAMORE LTD
1 1 1
1 I 1
III
|04|GA|PAYCO PALLET & DRUM
1 1 1
1 1 1
1 1 1
1 1 1
|04|GA[ROCK BRIDGE PARK
1 1
1 1
1 1
1 1
1 1
|04|GA|ROME COAL TAR
1 1 1
1 1 1
1 1 1
1 1 1
1 1 1
| LOCATION |NPL| INCIDENT | THREATS
| | | CATEGORY |
ILEESBURG
I
1
|
[ELLENWOQD
1
|
1
1
IDEKALB COUNTY
1
1
1
1
1
1
j ROME
1
1
1
1
1
N [MIDNIGHT DUMP |DIRECT CONTACT
1 1
1 1
1 1
N (MIDNIGHT DUMP |AIR CONTAMINATION
I [DRINKING WATER CONTAMINATION
| |SOIL CONTAMINATION
I ISURFACE WATER CONTAMINATION
1 1
N [MIDNIGHT DUMP (DIRECT CONTACT
1 1
1 1
1 1
1 . 1
1 ' 1
N [INACTIVE WASTE MANAGEMENT FACILITY [DIRECT CONTACT
| [AIR CONTAMINATION
| [SURFACE WATER CONTAMINATION
1 1
1 1
1 1
| MITIGATIVE ACTIONS
1
[DISPOSAL
[REPACKED DRUMS
[EXCAVATION
1
[DISPOSAL
[ORGANIZED MATERIALS
[SECURITY
[SAMPLING.ANALYSIS
1
[DISPOSAL
[ORGANIZED MATERIALS
| MIGRATION CONTROL
| SECURITY
[SAMPLING, ANALYSIS
1
[DISPOSAL
| COST |
[$(000) |
|$ 30 1
1 1
1 1
1 1
|$ 25|
1 1
1 1
1 1
1 1
|$ 25 1
1 1
1 1
1 1
1 1
1 1
|$ 100|
[CONTAMINANT CONTAINMENT/RETENTION) |
[EXCAVATION
[SECURITY
[SAMPLING, ANALYSIS
1
I I
I I
I I
I I
-------
SUPERFUND EMERGENCY RESPONSE ACTIONS
HISTORICAL
|RG|ST| NAME | LOCATION
III 1
| 04 |GA| ROOSEVELT HIGHWAY SPILL [COLLEGE PARK
III 1
III 1
III 1
III 1
III 1
|04|GA|SALVO PROPERTY [LITHIA SPRINGS
III 1
III 1
| 04 |GA| SIMPSON ROAD DRUM [ATLANTA
1 1 1 1
III 1
III I
III 1
III 1
III 1
NPL| INCIDENT
| CATEGORY
N [MIDNIGHT DUMP
1
1
1
1
1
N [MIDNIGHT DUMP
1
1
N [MIDNIGHT DUMP
1
1
1
1
1
1
| THREATS
1
[DIRECT CONTACT
[DRINKING WATER CONTAMINATION
1
1
1
1
[DIRECT CONTACT
[SOIL CONTAMINATION
1
[FIRE/EXPLOSION
1
1
1
1
1
1
| MITIGATIVE ACTIONS
1
[DISPOSAL
[BULKED MATERIALS
[ORGANIZED MATERIALS
[SOLIDIFIED MATERIALS
[SAMPLING, ANALYSIS
1
[DISPOSAL
1
1
(DISPOSAL
(REPACKED DRUMS
(EXCAVATION
(SECURITY
(RESTORATION
(SAMPLING, ANALYSIS
1
| COST |
|$(000)|
|$ 35 1
1 1
1 1
1 1
1 1
1 1
|$ 7|
1 1
1 1
|$ 27|
1 1
1 1
1 1
1 1
1 1
1 1
-------
SUPERFUND EMERGENCY RESPONSE ACTIONS
HISTORICAL
|RG|ST| NAME
1 1 1
|04|GA|SWAINSBORO PRINTWORKS
1 1 1
1 1 1
1 1 1
1 1 1
1 1 1
|04|GA|U.S. CUSTOMS PESTICIDE
1 1 1
1 1 1
1 1 1
|04|GA|VILLA RICA-HIGH POINT RD
1 1 1
1 1 1
1 1 1
1 1 1
| 04 |GA| WOODWARD MILL ROAD
1 1 1
1 1 1
| LOCATION
. 1
[SWAINSBORO
1
1
1
1
1
[SAVANNAH
1
1
1
[DOUGLAS COUNTY
1
1
1
1
IBUFORD
1
1
NPL| INCIDENT
| CATEGORY
N (INACTIVE WASTE MANAGEMENT
1
1
1
1
1
N [TRANSPORTATION-RELATED
1
1
1
N [MIDNIGHT DUMP
1
1
1
1
N (MIDNIGHT DUMP
1
1
| THREATS
1
FACILITY (DIRECT CONTACT
(SOIL CONTAMINATION
1
1
1
1
[DIRECT CONTACT
(AIR CONTAMINATION
[SOIL CONTAMINATION
1
[DIRECT CONTACT
[DRINKING WATER CONTAMINATION
[GROUNDWATER CONTAMINATION
[SOIL CONTAMINATION
1
[FIRE/EXPLOSION
1
1
| MITIGATIVE ACTIONS
1
[DISPOSAL
[REPACKED DRUMS
[ORGANIZED MATERIALS
[BULKED MATERIALS
[SAMPLING, ANALYSIS
1
[DISPOSAL
[SECURITY
1
1
(DISPOSAL
(ORGANIZED MATERIALS
(SOLIDIFIED MATERIALS
(SAMPLING, ANALYSIS
1
[DISPOSAL
(REPACKED DRUMS
1
| COST |
($(000) |
|$ 350 [
1 1
1 1
1 1
1 . 1
1 1
|$ 231 |
1 1
1 1
1 1
|$ 17|
I I
I I
I I
I I
|$ 2|
I I
I I
-------
SUPERFUND EMERGENCY RESPONSE ACTIONS
HISTORICAL
|RG|ST| NAME
Ml
| LOCATION |NPL|
1 1 1
INCIDENT
CATEGORY
| THREATS | MITIGATIVE ACTIONS | COST |
1 I |$(000)|
|04|KY|A.L. TAYLOR (VALLEY OF THE DRUMS) [BROOKS
Ml |
Y [INACTIVE WASTE MANAGEMENT FACILITY[FIRE/EXPLOSION
| [SURFACE WATER CONTAMINATION
| IGROUNDWATER CONTAMINATION
| (SOIL CONTAMINATION
ISAMPLING.ANALYSIS |$ 378|
[ORGANIZED MATERIALS | |
[CONTAMINANT CONTAINMENT/RETENTION) |
|04|KY|COAL BRANCH HOLLOW
I I I
I I I
IGREENUP
N [INACTIVE PRODUCTION FACILITY
[DIRECT CONTACT
[SURFACE WATER CONTAMINATION
I
[SAMPLING,ANALYSIS
I
I
|$ 321
|04|KY|DISTLER BRICKYARD
I I
[WEST POINT
N*|INACTIVE WASTE MANAGEMENT FACILITY|FIRE/EXPLOSION
[AIR CONTAMINATION
[DIRECT CONTACT
[DRINKING WATER CONTAMINATION
[SURFACE WATER CONTAMINATION
IGROUNDWATER CONTAMINATION
[SOIL CONTAMINATION
[DISPOSAL
[ORGANIZED MATERIALS
[SAMPUNG,ANALYSIS
|$ 269|
NOTE: NON-NPL SITE AT INITIATION OF REMOVAL. HOWEVER, CURRENTLY ON PROPOSED OR FINAL NPL.
-------
SUPERFUND EMERGENCY RESPONSE ACTIONS
HISTORICAL
|RG|ST| NAME | LOCATION
1 1
04|KY|DISTLER FARM (JEFFERSOH CO
1 1
1 1
1 1
1 1
1 1
04 |KY (GEORGE 0' BRYAN SITE (LOUISVILLE
1 1
1 1
1 1
1 1
1 1
04 IKY (HARRISON (CYNTHIANA
1
1
1
1
1
1
NPL| INCIDENT
| CATEGORY
Y (INACTIVE WASTE MANAGEMENT
N | INACTIVE WASTE MANAGEMENT
1
!
1
1
1
N (INACTIVE WASTE MANAGEMENT
1
1
1
1
1
| THREATS
1
FACILITY|DIRECT CONTACT
(DRINKING WATER CONTAMINATION
(SURFACE WATER CONTAMINATION
(GROUNDWATER CONTAMINATION
(SOIL CONTAMINATION
1
FACILITY|DIRECT CONTACT
(FIRE/EXPLOSION
1
1
1
1
FACILITY (DIRECT CONTACT
(FIRE/EXPLOSION
(AIR CONTAMINATION
(SURFACE WATER CONTAMINATION
(SOIL CONTAMINATION
1
1
| MITIGATIVE ACTIONS
1
(DISPOSAL
(NEUTRALIZED MATERIALS
(EXCAVATION
(RESTORATION
(SAMPLING, ANALYSIS
1
(DISPOSAL
(REPACKED DRUMS
(ORGANIZED MATERIALS
(PUMPED OUT CONTAMINANTS
(SAMPLING.ANALYSIS
1
(DISPOSAL
(ORGANIZED MATERIALS
(SOLIDIFIED MATERIALS
[EXCAVATION
(RESTORATION
(SAMPLING, ANALYSIS
1
| COST |
($(000) |
|$ 344|
1 1
1 1
1 1
1 1
1 1
|$ 355|
1 1
1 1
1 1
1 1
1 1
|$ 283 1
1 1
1 1
1 1
1 1
1 1
1 1
-------
SUPERFUND EMERGENCY RESPONSE ACTIONS
HISTORICAL
|RG|ST| NAME
1 1 1
|04|KY|KEITH FARM POND
! 1- 1
III
1 1 1
1 1 1
|04|KY|MIDNIGHT DUMPING (KY)
1 1 1
1 1 1
1 1 1
|04|KY|SMITH'S FARM
1 1 1
1 1 1
1 1 1
1 1 1
|04|KY|WHITLEY COUNTY
1 1 1
III
1 1 1
1 1 1
Ml
| LOCATION |NPL| INCIDENT
| | | CATEGORY
| BOWL ING GREEN
1
1
1
1
IHENDERSONVILLE
1
1
1
| BROOKS
1
1
1
1
ISILER
1
1
1
1
1
N [OTHER
1
1
1
1
N (MIDNIGHT DUMP
1 -
1
1
N*| INACTIVE WASTE MANAGEMENT
1
1
1
1
N [MIDNIGHT DUMP
1
1
1
1
1
| THREATS
| MIT I GAT I VE ACTIONS | COST |
| | |$COOO)|
IDIRECT CONTACT
[SURFACE WATER CONTAMINATION
|SOIL CONTAMINATION
1
1
IFIRE/EXPLOSION
1
1
1
FACILITY [DIRECT CONTACT
IFIRE/EXPLOSION
| SURFACE WATER CONTAMINATION
|SOIL CONTAMINATION
1
[SURFACE WATER CONTAMINATION
[SOIL CONTAMINATION
1
1
1
1
| DISPOSAL |$
| CONTAM I NANT CONTAI NMENT/RETENT I ON |
[MIGRATION CONTROL |
[EXCAVATION |
1 1
[DISPOSAL " |$
[REPACKED DRUMS |
[SAMPLING, ANALYSIS |
1 - 1
[DISPOSAL |$
[ORGANIZED MATERIALS |
[EXCAVATION ' +\
[SAMPLING, ANALYSIS |
1 1
[DISPOSAL |$
[BULKED MATERIALS |
[ORGANIZED MATERIALS |
[SOLIDIFIED MATERIALS |
[SAMPLING.ANALYSIS |
1 1
180 1
1
1
1
1
10|
I
I
I
890 1
I
I
I
I
76|
I
I
I
I
I
* NOTE: NON-NPL SITE AT INITIATION OF REMOVAL. HOWEVER, CURRENTLY ON PROPOSED OR FINAL NPL.
-------
SUPERFUND EMERGENCY RESPONSE ACTIONS
HISTORICAL
|RG|ST| NAME | LOCATION
III 1
(04 (MS (ABANDONED DRUM SITE (JACKSON
1 1 1
1 1 1
(04 (MS (AMERICAN CREOSOTE WORKS (MS) (LOUISVILLE
1
1
1
1
1 1
1 1
1 1
1 1
(04 (MS (BERGERON MARINE |PE ARLINGTON
1 1
1 1
1 1 1
1 1
1 1 1
1 1 1
NPL| INCIDENT
| CATEGORY
N (MIDNIGHT DUMP
1
1
N (INACTIVE PRODUCTION FACILITY
1
1
1
1
1
1
1
1
N (ACTIVE PRODUCTION FACILITY
1
1
1
1
1
1
| THREATS
1
(DIRECT CONTACT
(SOIL CONTAMINATION
1
(DIRECT CONTACT
(DRINKING WATER CONTAMINATION
(SURFACE WATER CONTAMINATION
(GROUNDWATER CONTAMINATION
(SOIL CONTAMINATION
1
1
1
1
(FIRE/EXPLOSION
(ECOLOGICAL DAMAGE
1
1
1
1
1
( MITIGATIVE ACTIONS
1
(DISPOSAL
| SAMPLING, ANALYSIS
1
(DISPOSAL
(PUMPED OUT CONTAMINANTS
(CAPPED
(SOLIDIFIED MATERIALS
(MIGRATION CONTROL
(EXCAVATION
(RESTORATION
[SAMPLING, ANALYSIS
1
(DISPOSAL
(BULKED MATERIALS
(EXCAVATION
(SECURITY
(RESTORATION
(SAMPLING, ANALYSIS
1
| COST |
($(000) |
|$ 2|
1 1
1 1
|$ 1325 |
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
($ 215|
1 1
1 1
1 1
1 1
1 1
1 1
-------
SUPERFUND EMERGENCY RESPONSE ACTIONS
HISTORICAL
|RG|ST| NAME
1
| 04 |MS| CANTON PLATING & BUMPER WORKS
.
04|MS|CAUSTIC CHEMICAL
1
1
04|MS|GULF BATTERY EXCHANGE
LOCATION
CANTON
WOODVILLE
FOUNTAINBLEAU
INPLI INCIDENT THREATS j MITIGATIVE ACTIONS | COST
CATEGORY | [$(000)
N [INACTIVE PRODUCTION FACILITY [DIRECT CONTACT [DISPOSAL |$ 200
[SOIL CONTAMINATION [SOLIDIFIED MATERIALS
[BULKED MATERIALS
[EXCAVATION |
[SECURITY |
[SAMPLING, ANALYSIS |
1 1
N [MIDNIGHT DUMP [DIRECT CONTACT [SAMPLING.ANALYSIS |$ 10
[SOIL CONTAMINATION [NEUTRALIZED MATERIALS
I I I
N (INACTIVE WASTE MANAGEMENT FACILITY [DIRECT CONTACT [DISPOSAL |$ 130
I [DRINKING WATER CONTAMINATION [CAPPED
[ECOLOGICAL DAMAGE [BULKED MATERIALS
I [SURFACE WATER CONTAMINATION [EXCAVATION
I [SOIL CONTAMINATION [RESTORATION
I [GROUNDWATER CONTAMINATION [SAMPLING.ANALYSIS
I
-------
SUPERFUND EMERGENCY RESPONSE ACTIONS
HISTORICAL
|RG|ST| NAME
1 1 1
|04|MS|MIDNIGHT DUMP
1 1 I
1 1 !
1 1 1
| 04 | MS | NATCHEZ DRUG SITE
III
1 1 1
1 1 1
|04|MS|NESBIT SCALE HOUSE
1 1 1
1 1 1
1 1 1
III
|04|MS|NEUSOME BROTHERS/OLD REICHOLD
1 1 1
1 1 1
1 1 1
1 1 1
1 LOCATION |NPL| INCIDENT
| II CATEGORY
IMCHENRY COUNTY
1
1
1
| NATCHEZ
1
1
1
INESBIT
i
i
I
|
1
(COLUMBIA
1
1
1
1
N (MIDNIGHT DUMP
1
1
1
N (ACTIVE PRODUCTION FACILITY
1
1
1
N (MIDNIGHT DUMP
1
1
1
1
N*| INACTIVE WASTE MANAGEMENT
1
1
1
1
| THREATS
1
(DIRECT CONTACT
1
1
1
(FIRE/EXPLOSION
1
1
1
(DIRECT CONTACT
(SOIL CONTAMINATION
1
1
1
FACILITY|DRINKING WATER CONTAMINATION
|SOIL CONTAMINATION
1
1
1
| MITIGATIVE ACTIONS
1
(DISPOSAL
(EXCAVATION
(SAMPLING, ANALYSIS
1
(SAMPLING, ANALYSIS
(NEUTRALIZED MATERIALS
(REPACKED DRUMS
1
[DISPOSAL
(REPACKED DRUMS
(ORGANIZED MATERIALS
(EXCAVATION
1
(DISPOSAL
| PUMPED OUT CONTAMINANTS
(NEUTRALIZED MATERIALS
(MIGRATION CONTROL
1
| COST |
|$(000)|
|$
1
1
1
|$
1
1
1
|$
1
1
1
1
1$
1
1
1
1
50|
1
1
1
15 1
1
1
1
43 1
1
1
1
1
162|
I
I
I
I
* NOTE: NON-NPL SITE AT INITIATION OF REMOVAL. HOWEVER, CURRENTLY ON PROPOSED OR FINAL NPL.
-------
SUPERFUND EMERGENCY RESPONSE ACTIONS
HISTORICAL
|RG|ST| NAME | LOCATION |NPL| INCIDENT | THREATS
III
| CATEGORY |
|04|MS|PLASTIFAX, INC. (GULFPORT | N (ACTIVE PRODUCTION FACILITY (DIRECT CONTACT
1
1
1
1
1
1
1
1
'
| (FIRE/EXPLOSION
| (AIR CONTAMINATION
| (SOIL CONTAMINATION
| (SURFACE WATER CONTAMINATION
I (GROUNDWATER CONTAMINATION
1 1
1 1 1
1 1
|04|HS|S. ELECTROFORMING (KOSCIUSKO | N (INACTIVE PRODUCTION FACILITY (DIRECT CONTACT
(II I I (FIRE/EXPLOSION
1 1 1 1 1 1
III 1 1
III 1 1
1 1 1
1
| 04 (MS |SON FORD PRODUCTS (JACKSON N (ACTIVE PRODUCTION FACILITY (AIR CONTAMINATION
| MITIGATIVE ACTIONS
1
.(DISPOSAL
| COST |
($(000) |
|$ 167|
(CONTAMINANT CONTAINMENT/RETENTION) |
(ORGANIZED MATERIALS
(REPACKED DRUMS
(MIGRATION CONTROL
(EXCAVATION
| RELOCAT I ON/E VACUAT I ON
(SAMPLING .ANALYSIS
1
(DISPOSAL
(BULKED MATERIALS
(SOLIDIFIED MATERIALS
1 1
1 1
1 1
1 1
1 1
1 1
1 1
|$ 28 1
1 1
1 1
(CONTAMINANT CONTAINMENT/RETENTION | |
(SAMPLING, ANALYSIS
1
(DISPOSAL
1 1
1 1
|$ 400|
IGROUNDWATER CONTAMINATION
|SOIL CONTAMINATION
(CONTAMINANT CONTAINMENT/RETENTION]
(ORGANIZED MATERIALS |
(EXCAVATION |
(SECURITY |
(RESTORATION |
(SAMPLING,ANALYSIS |
* NOTE: NON-NPL SITE AT INITIATION OF REMOVAL. HOWEVER, CURRENTLY ON PROPOSED OR FINAL NPL.
-------
SUPERFUND EMERGENCY RESPONSE ACTIONS
HISTORICAL
RG|ST| NAME | LOCATION |NPL| INCIDENT
1 1 1
( CATEGORY
THREATS | MITIGATIVE ACTIONS
1
| COST |
($(000) |
04 | MS | SOUTHERN LUMBER CO. (CROSBY | N (INACTIVE PRODUCTION FACILITY (DIRECT CONTACT (CONTAMINANT CONTAINMENT/RETENTION |$ 90|
I 1 1
11 1
1 1 1
| (FOOD CHAIN CONTAMINATION (MIGRATION CONTROL
| (SURFACE WATER CONTAMINATION |
1
1
04|NC|AHOSKIE MIDNIGHT DUMP (AHOSKIE | N (MIDNIGHT DUMP (DIRECT CONTACT (DISPOSAL
III 1
Ml 1
1
1
Ml 1 (1
04|NC|BUCKHORN PESTICIDE FIRE (BUCKHORN
III 1
Ml 1
Ml 1
M 1 1
04|NC|BUSH BROTHERS PLATING (REIDSVILLE
1 1 1
1 1 1
1 1 1
1 1 1
1 1 1
1 1 1
1 1 1
(REPACKED DRUMS
(SAMPLING, ANALYSIS
1
N (ACTIVE PRODUCTION FACILITY (DIRECT CONTACT (DISPOSAL
| IGROUNDUATER CONTAMINATION (EXCAVATION
| (SOIL CONTAMINATION (SECURITY
1
1
(SAMPLING .ANALYSIS
1
N (INACTIVE PRODUCTION FACILITY (DIRECT CONTACT (DISPOSAL
1 1
1 1
1
|$ 3(
1 1
1 1
1 1
|$ 15|
1 1
1 1
1
1
|$ 120
| (FIRE/EXPLOSION (CONTAMINANT CONTAINMENT/RETENTION |
1
1
I
1
1
I
(BULKED MATERIALS
(MIGRATION CONTROL
(EXCAVATION
(SECURITY
(SAMPLING, ANALYSIS
r
I
I
I
I
I
I
-------
SUPERFUND EMERGENCY RESPONSE ACTIONS
HISTORICAL
|RG|ST| NAME | LOCATION
Ml 1
|04|NC|CALDWELL COUNTY (LENOIR
Ml I
III 1
1 -1 1 1
III 1
III 1
|04|NC|CAPE FEAR WOOD PRESERVING (FAYETTEVILLE
1 1 1
1 1 1
III
1 1 1
1 1 1
1 1 1
1 1 1
|04|NC|CAPE HATTERAS NATIONAL SEASHORE-CG (ROOANTHE
Ml 1
Ml 1
M 1 I
NPL| INCIDENT | THREATS
| CATEGORY |
N (INACTIVE WASTE MANAGEMENT FACILITY [DIRECT CONTACT
| IFIRE/EXPLOSION
| | GROUND WATER CONTAMINATION
| [SOIL CONTAMINATION
| (SURFACE WATER CONTAMINATION
1 1
N*| INACTIVE PRODUCTION FACILITY (DIRECT CONTACT
| (FIRE/EXPLOSION
| (DRINKING WATER CONTAMINATION
| (SURFACE WATER CONTAMINATION
| (GROUNDWATER CONTAMINATION
1 1
1 1
1 1
N (MIDNIGHT DUMP (DIRECT CONTACT
| (SURFACE WATER CONTAMINATION
| (SOIL CONTAMINATION
1 1
| MITIGATIVE ACTIONS
1
(DISPOSAL
(ORGANIZED MATERIALS
(EXCAVATION
(RESTORATION
(SAMPLING, ANALYSIS
1
(DISPOSAL
(SOLIDIFIED MATERIALS
(WATER SUPPLIED
(EXCAVATION
(SECURITY
(RESTORATION
(SAMPLING, ANALYSIS
1
(DISPOSAL
(SECURITY
(SAMPLING, ANALYSIS
1
| COST |
($(000) |
|$ 40 1
1 1
1 1
1 1
1 1
1 1
|$ 160 |
1 1
1 1
1 1
1 1
1 1
1 1
! 1
|$ 2|
1 1
1 1
1 1
* NOTE: NON-NPL SITE AT INITIATION OF REMOVAL. HOWEVER, CURRENTLY ON PROPOSED OR FINAL NPL.
-------
SUPERFUND EMERGENCY RESPONSE ACTIONS
HISTORICAL
|RG|ST| NAME | LOCATION
1 1 !
| 04 |NC [CAROLINA TRANSFORMER [FAYETTEVILLE
1 1 I
1 I 1
1 1 1
1 1 1
I 1 1
! 1 I
|04|NC|CHEMTRONICS, INC. [SWANNANOA
III 1
1 1 1
II 1
| 04 |NC| CLAYTON BALLFIELD PESTICIDE ' [CLAYTON
III 1
III 1
III 1
III 1
III 1
NPL|
1
N [INACTIVE
1
1
1
1
1
1
Y (INACTIVE
1
1
1
N [INACTIVE
1
1
1
1
1
INCIDENT | THREATS
CATEGORY |
PRODUCTION FACILITY [SURFACE WATER CONTAMINATION
[GROUNDWATER CONTAMINATION
[SOIL CONTAMINATION
I
1
1
1
PRODUCTION FACILITY [DIRECT CONTACT
[AIR CONTAMINATION
1
1
WASTE MANAGEMENT FACILITY [DIRECT CONTACT
[SOIL CONTAMINATION
[SURFACE WATER CONTAMINATION
1
1
1
| MITIGATIVE ACTIONS -
1
[DISPOSAL
| CONTAM I NANT CONTA I NMENT/RETENT I ON
[SOLIDIFIED MATERIALS
[EXCAVATION
[RESTORATION
[SAMPLING, ANALYSIS
1
[DISPOSAL
[REPACKED DRUMS
[SAMPLING, ANALYSIS
1
[DISPOSAL
[BULKED MATERIALS
[EXCAVATION
[SECURITY
[RESTORATION
1
COST |
$(000) |
$ 300)
1
1
1
1
1
1
$ 10|
I
I
I
|$ 80 1
I
I
I
I
I
-------
SUPERFUND EMERGENCY RESPONSE ACTIONS
HISTORICAL
|RG|ST| NAME | LOCATION
III - 1
| 04 |NC [DAVENPORT CREOSOTE SPILL [PINETOPS
III 1
III - 1
III * 1
III - 1
III ' 1
|04|NC|DOCKERY PROPERTY | CORDOVA
III " 1
III 1
III . 1
III * 1
III ' 1
III 1
|04|NC|DOT MAINTENANCE, YARD JSHALLOTTE
III 1
III 1
III 1
NPL| INCIDENT
| CATEGORY
N | ACTIVE PRODUCTION FACILITY
1
1
1
1
1
N | INACTIVE PRODUCTION FACILITY
1
1
1
1
1
1
N JMIDNIGHT .DUMP
1
1
1
| THREATS
1
[DIRECT CONTACT
[DRINKING WATER CONTAMINATION
[SURFACE WATER CONTAMINATION
[GROUNDWATER CONTAMINATION
[SOIL CONTAMINATION
1
(DIRECT CONTACT
[AIR CONTAMINATION
IGROUNDWATER CONTAMINATION
(SOIL CONTAMINATION
1
1
1
(DIRECT CONTACT
1
1
1
| MITIGATIVE ACTIONS
1
[DISPOSAL
[EXCAVATION
[SAMPLING, ANALYSIS
1
1
1
[DISPOSAL
[NEUTRALIZED MATERIALS
[REPACKED DRUMS
[PUMPED OUT CONTAMINANTS
[ORGANIZED MATERIALS
[SOLIDIFIED MATERIALS
1
[DISPOSAL
[BULKED MATERIALS
[EXCAVATION
1
COST |
$<000)|
$ 55|
1
1
1
1
1
$ 110|
I
I
I
I
I
,,,. I
$ 9|
I
I
I
-------
SUPERFUND EMERGENCY RESPONSE ACTIONS
HISTORICAL
|RG|ST| NAME LOCATION
III 1
| 04 |NC (ELIZABETH CITY DRUM (ELIZABETH CITY
1 1 1
1 1
|04|NC|EVERHART LUMBER SITE |NEW BERN
III 1
III 1
III 1
1 1 1
1 1 1
|04|NC|GILLCREST ROAD |WAKE FOREST
1 1 1
1 1 1
III 1
|04|NC|LENOIR REFINING (LENOIR
1 1
1 1
1 1
1 1
1 1
NPL| INCIDENT
CATEGORY
N [MIDNIGHT DUMP
N (ACTIVE PRODUCTION FACILITY
1
1
1
1
N (MIDNIGHT DUMP
1
1
N (INACTIVE WASTE MANAGEMENT
| THREATS
1
(DIRECT CONTACT
1
1
(DIRECT CONTACT
(SOIL CONTAMINATION
1
1
1
1
(DIRECT CONTACT
1
1
1
FACILITY (AIR CONTAMINATION
(DIRECT CONTACT
(FIRE/EXPLOSION
(SURFACE WATER CONTAMINATION
(SOIL CONTAMINATION
1
| MITIGATIVE ACTIONS
1
(DISPOSAL
(SAMPLING.ANALYSIS
1
(DISPOSAL
(NEUTRALIZED MATERIALS
(MIGRATION CONTROL
(EXCAVATION
(SAMPLING, ANALYSIS
1
(DISPOSAL
(REPACKED DRUMS
| SAMPLING, ANALYSIS
1
(DISPOSAL
(ORGANIZED MATERIALS
| PUMPED OUT CONTAMINANTS
(EXCAVATION
(SAMPLING, ANALYSIS
1
COST |
$(000) |
$ 2|
1
1
$ 11|
I
I
I
I
I
$ 2|
I
I
I
$ 93 1
I
I
I
I
I
-------
SUPERFUND EMERGENCY RESPONSE ACTIONS
HISTORICAL
|RG|ST| NAME | LOCATION
III 1
|04|NC|MACON PROPERTY (CORDOVA
III 1
III 1
III 1
III . 1
II 1 1
II 1 1
II 1 1
III 1
|04|NC|MIDNIGHT DUMPING/GUILFORD (GUILFORD
III 1
III 1
III 1
| 04 |NC (ONE -HOUR KORETIZING (DURHAM
III 1
III 1
III 1
III 1
NPL| INCIDENT
| CATEGORY
N (INACTIVE PRODUCTION FACILITY
1
1
1
1
1
1
1
1
N (MIDNIGHT DUMP
1
1
1
N (ACTIVE PRODUCTION FACILITY
1
1
1
1
| THREATS
1
(DIRECT CONTACT
(SOIL CONTAMINATION
1
1
1
1
1
1
1
(DIRECT CONTACT
(SOIL CONTAMINATION
1
1
(DRINKING WATER CONTAMINATION
(GROUNDWATER CONTAMINATION
1
1
1
| MITIGATIVE ACTIONS | COST |
| |$(000)|
(DISPOSAL |$ 532 |
(SOLIDIFIED MATERIALS |
(PUMPED OUT CONTAMINANTS |
(CAPPED |
(EXCAVATION |
(SECURITY |
(RESTORATION |
| SAMPLING, ANALYSIS |
1 1
(DISPOSAL $ 2|
(NEUTRALIZED MATERIALS |
(SAMPLING, ANALYSIS |
1 1
(DISPOSAL |$ 14|
(MIGRATION CONTROL | |
(WATER SUPPLIED | |
| SAMPLING, ANALYSIS | |
I I I
-------
SUPERFUND EMERGENCY RESPONSE ACTIONS
HISTORICAL
|RG|ST| NAME | LOCATION
III 1
| 04 |NC| PLYMOUTH WOOD TREATMENT | PLYMOUTH
Ml I
Ml I
Ml 1
M 1 I
Ml 1
| 04 |NC| POTTERS PITS |MACO
Ml I
II 1 - 1
M 1 !
Ill 1
|04|NC|ROUTE 211 PESTICIDE SITE (ABERDEEN
I M I
M I I
I M I
I I I I
NPL| INCIDENT | THREATS
| CATEGORY |
N [INACTIVE PRODUCTION FACILITY |SOIL CONTAMINATION
I I
I I
I I
I I
I I
N [INACTIVE WASTE MANAGEMENT FACILITY [DIRECT CONTACT'
| (DRINKING WATER CONTAMINATION
| IGROUNDWATER CONTAMINATION
| | SOIL CONTAMINATION
I - I
N [MIDNIGHT DUMP " (DIRECT CONTACT
| (DRINKING UATEfc CONTAMINATION
| IGROUNDWATER CONTAMINATION
| | SOIL CONTAMINATION
I I
| MITIGATIVE ACTION
I
[DISPOSAL
(NEUTRALIZED MATERIALS
(EXCAVATION
(RESTORATION
(SAMPLING, ANALYSIS
I
(DISPOSAL
(EXCAVATION
(RESTORATION
(SAMPLING, ANALYSIS
I
(DISPOSAL
(BULKED MATERIALS
(EXCAVATION
I
I
S | COST |
\ | $(000) |
|$ 207|
I I
I I
I I
I I
I I
|$ 264 |
I I
I I
I I
I I
I* 50 1
I I
I I
I I
I I
-------
SUPERFUND EMERGENCY RESPONSE ACTIONS
HISTORICAL
|RG|ST| NAME | LOCATION
III 1
| 04 |NC| SALVAGE OIL OF AMERICA [ROCKINGHAM
III 1
III 1
III 1
III 1
III !
Ill 1
III 1
| 04 |NC| SAMPSON COUNTY DUMPSTER [ROSEBORO
III 1
III 1
|04|NC|SCOTTS CREEK 'BATTERY |NEW BERN
Ml 1
II 1 1
II 1 1
Ml 1
III 1
Ml 1
NPL| INCIDENT | THREATS
| CATEGORY |
N [INACTIVE PRODUCTION FACILITY [DIRECT CONTACT
| IFIRE/EXPLOSION
| |SOIL CONTAMINATION
1 1
1 1
1 1
1 1
1 1
N [MIDNIGHT DUMP [DIRECT CONTACT
| [AIR CONTAMINATION
1 1
N [INACTIVE WASTE MANAGEMENT FACILITY [DIRECT CONTACT
| [AIR CONTAMINATION
| [SURFACE WATER CONTAMINATION
| [GROUNDUATER CONTAMINATION
| [ECOLOGICAL DAMAGE
1 1
1 1
| MITIGATIVE ACTIONS |
1 1
[DISPOSAL |
[BULKED MATERIALS
[SOLIDIFIED MATERIALS
[ORGANIZED MATERIALS
[EXCAVATION
[SECURITY
[SAMPLING, ANALYSIS
1
[DISPOSAL
1
1
[DISPOSAL
[MIGRATION CONTROL
[EXCAVATION
[SECURITY
[RESTORATION
[SAMPLING, ANALYSIS
1
COST |
$(000) |
$ 88|
1
1
1
1
1
1
1
$ 3|
1
1
$ 87|
1
.1
1
1
1
1
-------
SUPERFUND EMERGENCY RESPONSE ACTIONS
HISTORICAL
|RG|ST| NAME
1 1 1
| 04 |NC| SOUTH RIVERDALE DRIVE
1 1 I
1 1 1
1 1 1
|04|NC|US HIGHWAY 1 TRUCK SITE
I I I
I I I
I I I
| LOCATION
I
(DURHAM
I
I
I
IVASS
I
I
I
NPL| INCIDENT | THREATS
' | CATEGORY |
N IOTHER IDRINKING WATER CONTAMINATION
I IGROUNDWATER CONTAMINATION
I I
I I
N (TRANSPORTATION-RELATED |DIRECT CONTACT
| [DRINKING WATER CONTAMINATION
| (SURFACE WATER CONTAMINATION
I I
| MITIGATIVE ACTIONS
I
(WATER SUPPLIED
(RESTORATION
(SAMPLING, ANALYSIS
I
(DISPOSAL
(ORGANIZED MATERIALS
(WATER SUPPLIED
(EXCAVATION
| COST |
($(000) |
|$ 370 |
I I
I !
I I
|$ 94 1
I I
I I
I I
I I I
1 04
NC
WESTERN CAROLINA SMELTING (MADISON COUNTY
I
I
I
I
I
I
I
I
I
N
I I II
INACTIVE PRODUCTION FACILITY (DIRECT CONTACT (DISPOSAL |$ 81 1
I (REPACKED DRUMS | |
I (SOLIDIFIED MATERIALS | |
I (NEUTRALIZED MATERIALS | |
I (BULKED MATERIALS | |
I (MIGRATION CONTROL | |
I | EXCAVATION ) |
I (SECURITY | |
I (SAMPLING, ANALYSIS | |
I I II
-------
SUPERFUND EMERGENCY RESPONSE ACTIONS
HISTORICAL
|RG|ST| NAME | LOCATION
1 1 1
|04|SC|BURKETT CYLINDER (CHARLESTON
1 1 1
1 1 I
i 1
|04|SC|C.D. BUFF (UNA
1 1
1 1
1 1
1 1
1 1
1 1
1 1
|04|SC|CAROLAWN, INC. (FORT LAWN
III
1 1 1
1
1
1
NPL| INCIDENT
CATEGORY
N (INACTIVE WASTE MANAGEMENT
1
1
1
N (INACTIVE WASTE MANAGEMENT
Y (INACTIVE WASTE MANAGEMENT
1
1
| THREATS
1
FACILITY (DIRECT CONTACT
(FIRE/EXPLOSION
(AIR CONTAMINATION
1
FACILITY (DIRECT CONTACT
(SOIL CONTAMINATION
1
1
1
1
1
1
FACILITY|DRINKING WATER CONTAMINATION
(GROUNDWATER CONTAMINATION
(SURFACE WATER CONTAMINATION
(SOIL CONTAMINATION
1
i
| MITIGATIVE ACTIONS | COST |
( |$(000)|
(DISPOSAL |$ 125 |
(EXCAVATION II
(SAMPLING, ANALYSIS |
1 1
(DISPOSAL |$ 20 |
(ORGANIZED MATERIALS |
(SOLIDIFIED MATERIALS |
(CONTAMINANT CONTAINMENT/RETENTION |
(EXCAVATION |
(SECURITY |
(SAMPLING ANALYSIS |
1 1
(DISPOSAL |$ 416
(ORGANIZED MATERIALS |
(WATER SUPPLIED |
(EXCAVATION |
(SAMPLING, ANALYSIS |
I I
-------
SUPERFUND EMERGENCY RESPONSE ACTIONS
HISTORICAL
|RG|ST| NAME | LOCATION
Ml 1
| 04 |SC| DREYFUS STREET | COLUMBIA
II 1 i
1 1 1
III i
1 1 1
III i
1 1 1
Ml I
|NPL| INCIDENT
| | CATEGORY
N (INACTIVE WASTE MANAGEMENT
1
1
1
1
I THREATS
1
FACILITY |D I RECT CONTACT
IFIRE/EXPLOSION
|AIR CONTAMINATION
|SOIL CONTAMINATION
1
| MITIGATIVE ACTIONS
1
(DISPOSAL
(EXCAVATION
(SAMPLING, ANALYSIS
|
1
| COST |
($(000)|
|$ 299|
1 1
1 1
| |
1 1
1 i
(04
1
'
(04
sc
sc
EARL ALLEN CHEMICAL SITES
HORRY CO. FIREUORKS
| NORTH AUGUSTA
1
MYRTLE BEACH
N
N
ACTIVE WASTE MANAGEMENT FACILITY (FIRE/EXPLOSION (DISPOSAL |$ 20
(DIRECT CONTACT (CONTAMINANT CONTAINMENT/RETENTION)
1 (ORGANIZED MATERIALS |
1 (EXCAVATION |
1 (SAMPLING .ANALYSIS |
1 1 1
TRANSPORTATION -RELATED (DIRECT CONTACT (DISPOSAL |$ 72]
(FIRE/EXPLOSION (ORGANIZED MATERIALS |
1 (REPACKED DRUMS |
1 (SECURITY |
1 (SAMPLING, ANALYSIS |
1 1 1
-------
SUPERFUND EMERGENCY RESPONSE ACTIONS
HISTORICAL
|RG|ST| NAME LOCATION |NPL| INCIDENT
III | CATEGORY
|04|SC| JIMMY'S TRUCK STOP (ORANGEBURG
1 1
1 I
1 I
1 1
1 1
|04|SC|MEOLEY FARM DRUM DUMP (GAFFNEY
1 I
1 1
1 1
1 1
1 1
1 1
N (MIDNIGHT DUMP
| THREATS
1
(FIRE/EXPLOSION
(SOIL CONTAMINATION
| MITIGATIVE ACTIONS
1
(DISPOSAL
(REPACKED DRUMS
| COST |
($(000) |
|$ 12|
I I
| (CONTAMINANT CONTAINMENT/RETENT I ON | |
N*( INACTIVE WASTE MANAGEMENT
| 04 |SC| NATIONAL GALVANIZING (TRAVELER'S REST) N (ACTIVE PRODUCTION FACILITY
1 1
1 1
1 1
1 1
1
1
1
1
1
1
1
1
1
FACILITY (DIRECT CONTACT
(AIR CONTAMINATION
(SURFACE WATER CONTAMINATION
(SOIL CONTAMINATION
1
1
1
(DIRECT CONTACT
(SOIL CONTAMINATION
| AIR CONTAMINATION
1
1
1
(SECURITY
(SAMPLING, ANALYSIS
1
(DISPOSAL
(BULKED MATERIALS
(ORGANIZED MATERIALS
(EXCAVATION
(RESTORATION
(SAMPLING, ANALYSIS
1
(DISPOSAL
(BULKED MATERIALS
(NEUTRALIZED MATERIALS
(EXCAVATION
(SAMPLING, ANALYSIS
1
I I
I I
I I
|$ 556|
I I
I I
I I
I I
I I
I I
|$ 260)
I I
I I
I I
I I
I I
* NOTE: NON-NPL SITE AT INITIATION OF REMOVAL. HOWEVER, CURRENTLY ON PROPOSED OR FINAL NPL.
-------
SUPERFUND EMERGENCY RESPONSE ACTIONS
HISTORICAL
|RG|ST| NAME | LOCATION |NPL| INCIDENT | THREATS | MITIGATIVE ACTIONS | COST
1
| | CATEGORY | | |$(000)
| 04 |SC| PALMETTO WOOD PRESERVING [DIXIANNA
1 1 I
1
|04|SC|REIMER DRUM [BATH
III 1
1 1 1
1 1
| 04 |TN| AMERICAN CREOSOTE/JACKSON PLANT [JACKSON
Y (ACTIVE PRODUCTION FACILITY [DRINKING WATER CONTAMINATION [WATER SUPPLIED |$ 3]
[GROUNDWATER CONTAMINATION | |
1 1 II
N [MIDNIGHT DUMP [DIRECT CONTACT [DISPOSAL |$ 60 |
1 [FIRE/EXPLOSION [RELOCATION/EVACUATION | |
1 | [SAMPLING, ANALYSIS | |
1 1 1 II
Y [INACTIVE PRODUCTION FACILITY [DIRECT CONTACT [DISPOSAL |$ 792]
1
[FIRE/EXPLOSION (CONTAMINANT CONTAINMENT/RETENTION]
[DRINKING WATER CONTAMINATION [PUMPED OUT CONTAMINANTS |
[AIR CONTAMINATION [CAPPED |
[SURFACE WATER CONTAMINATION [MIGRATION CONTROL |
| GROUNDWATER CONTAMINATION [SECURITY |
[SOIL CONTAMINATION [RESTORATION |
[ECOLOGICAL DAMAGE |SAMPLING,ANALYSIS |
1 1 1
-------
SUPERFUND EMERGENCY RESPONSE ACTIONS
HISTORICAL
|RG|ST| NAME
1 1 1
1 04 |TN| ARLINGTON BLENDING
III'
1 1 1
1 1 1
1 1 1
III
|04|TN|GALLAHAY PITS
1 1 1
1 1 1
1 1 1
1 1 1
1 1 1
1 1 1
|04|TN(HAMILL-HOOKER RD #3
1 1 1
1 1 1
III
1 1 1
1 1 1
1 1 1
| LOCATION
1
(ARLINGTON
1
1
|
1
1
(GALLAWAY
1
1
1
1
1
1
(CHATTANOOGA
1
1
1
1
1
1
NPL| INCIDENT | THREATS
| CATEGORY |
N (INACTIVE PRODUCTION FACILITY (DIRECT CONTACT
| (DRINKING WATER CONTAMINATION
| (SURFACE WATER CONTAMINATION
| | GROUNDWATER CONTAMINATION
| (SOIL CONTAMINATION
1 1
Y (INACTIVE WASTE MANAGEMENT FACILITY|DIRECT CONTACT
| (DRINKING WATER CONTAMINATION
| (SURFACE WATER CONTAMINATION
| | GROUNDWATER CONTAMINATION
| (SOIL CONTAMINATION
1 1
1 1
N (INACTIVE WASTE MANAGEMENT FACILITY (DIRECT CONTACT
| (FOOD CHAIN CONTAMINATION
1 (AIR CONTAMINATION
( (SURFACE WATER CONTAMINATION
1 1
1 1
1 1
| MITIGATIVE ACTIONS
1
(DISPOSAL
(ORGANIZED MATERIALS
(NEUTRALIZED MATERIALS
(EXCAVATION
(SAMPLING, ANALYSIS
1
(DISPOSAL
(PUMPED OUT CONTAMINANTS
(SOLIDIFIED MATERIALS
(NEUTRALIZED MATERIALS
(EXCAVATION
(SAMPLING, ANALYSIS
1
(DISPOSAL
(BULKED MATERIALS
(EXCAVATION
(SECURITY
(RESTORATION
(SAMPLING, ANALYSIS
1
| COST |
($(000) (
|$ 538|
1 1
1 1
1 1
1 1
1 1
|$ 243|
1 1
1 ' 1
1 1
1 1
1 1
1 1
|$ 175|
1 1
1 1
1 1
1 1
1 1
1 1
-------
SUPERFUND EMERGENCY RESPONSE ACTIONS
HISTORICAL
|RG|ST| NAME
1 1 1
|04|TN|J & L DRUM SITE
1 1
1 1
1 1
1 1
1 1
|04|TN|MILLER SITE
1 1 1
1 1 1
III
| LOCATION
1
| MEMPHIS
1
1
1
1
1
(ROAN MOUNTAIN
1
1
1
NPL| INCIDENT | THREATS
CATEGORY |
N [INACTIVE WASTE MANAGEMENT FACILITY|DIRECT CONTACT
|AIR CONTAMINATION
[SURFACE WATER CONTAMINATION
|SOIL CONTAMINATION
1
1
N [OTHER [DIRECT CONTACT
| [DRINKING WATER CONTAMINATION
| [GROUNDWATER CONTAMINATION
1 1
| MITIGATIVE ACTIONS
1
[DISPOSAL
[EXCAVATION
[SECURITY
[RESTORATION
[SAMPLING, ANALYSIS
1
[WATER SUPPLIED
[SAMPLING, ANALYSIS
1
1
| COST |
[$(000) |
|$ 41 1
1 1
1 1
1 1
1- 1
1 1
|$ 45 1
1 1
1 1
1 1
-------
U. S. EPA REGION 5
For Information Contact:
Chief, Emergency and Remedial
Response Branch,
Waste Management Division
230 S. Dearborn Street
Chicago, IL 60604
(312) 353-9773
-------
SUPERFUND EMERGENCY RESPONSE ACTIONS
HISTORICAL
|RG|ST| NAME | LOCATION
Ml 1
|05|IL|A & F MATERIALS RECLAIMING |GREENUP
Ml 1
NPL| INCIDENT | THREATS
| CATEGORY |
Y [INACTIVE PRODUCTION FACILITY [DIRECT CONTACT
| [DRINKING WATER CONTAMINATION
| MITIGATIVE ACTIONS
1
(DISPOSAL
[PUMPED OUT CONTAMINANTS
| COST |
[$(000) |
|$ 312|
1 1
I I
I I
I I
I I
I I
I I
[SURFACE WATER CONTAMINATION
[ECOLOGICAL DAMAGE
[CAPPED [
[SOLIDIFIED MATERIALS |
[CONTAMINANT CONTAINMENT/RETENTION|
[MIGRATION CONTROL |
[RESTORATION |
I I
| 05 |IL| ABANDONED DRUM [EAST ST. LOUIS
III I
Ml 1
Ml 1
[05 |IL [ALBURN INCINERATOR [CHICAGO
1 1 1
1 1 1
1 1 1
1 1 1
1 1 1
N [MIDNIGHT DUMP
1
1
1
N (INACTIVE WASTE MANAGEMENT
1
1
1
1
1
[DIRECT CONTACT
(SURFACE WATER CONTAMINATION
(SOIL CONTAMINATION
1
FACILITY [DIRECT CONTACT
(FIRE/EXPLOSION
(AIR CONTAMINATION
IGROUNDWATER CONTAMINATION
1
1
[DISPOSAL |$ 2|
[REPACKED DRUMS | |
|SAMPLING,ANALYSIS | |
1 1 1
[DISPOSAL |$ 1119|
[REPACKED DRUMS | |
[MIGRATION CONTROL | |
[EXCAVATION | |
|SAMPLING,ANALYSIS | |
I I I
-------
SUPERFUND EMERGENCY RESPONSE ACTIONS
HISTORICAL
|RG|ST| NAME I LOCATION
III 1
|05|IL|BLUE CYANIDE CHIPS [CHICAGO
III 1
III I
III 1
III 1
III 1
|05|IL (CHICAGO DRUM (CHICAGO
III !
Ill 1
III 1
|05|IL|CYANIDE INCIDENT (CHICAGO
III 1
III 1
III 1
III 1
|05|IL|DANVILLE PLATING (DANVILLE
III 1
III 1
III 1
III 1
Ml 1
Ml ' I
Ml 1
Ml 1
NPL|
1
N (INACTIVE
N (OTHER
1
1
1
N (MIDNIGHT
1
N (INACTIVE
1
1
1
INCIDENT | THREATS
CATEGORY |
WASTE MANAGEMENT FACILITY|DIRECT CONTACT
(SURFACE WATER CONTAMINATION
1
1
1
1
(DIRECT CONTACT
1
1
1
DUMP (DIRECT CONTACT
1
1
1
1
PRODUCTION FACILITY (DIRECT CONTACT
(AIR CONTAMINATION
(SOIL CONTAMINATION
1
1
1
1
1
1
| MITIGATIVE ACTIONS
1
(DISPOSAL
(ORGANIZED MATERIALS
(NEUTRALIZED MATERIALS
(SECURITY
(SAMPLING, ANALYSIS
1
(DISPOSAL
(ORGANIZED MATERIALS
(SAMPLING, ANALYSIS
1
(DISPOSAL
(REPACKED DRUMS
(RELOCATION/EVACUATION
(SAMPLING, ANALYSIS
1
(DISPOSAL
(REPACKED DRUMS
(ORGANIZED MATERIALS
(SOLIDIFIED MATERIALS
(NEUTRALIZED MATERIALS
(BULKED MATERIALS
(SECURITY
(SAMPLING, ANALYSIS
1
| COST |
|$<000)|
|$ 174 1
I I
I I
I I
I I
II
I
|$ 22|
I I
I I
I I
|$ 1|
I I
I I
I I
I I
|$ 81 (
I I
I I
I I
I I
I I
I I
I I
I I
-------
SUPERFUND EMERGENCY RESPONSE ACTIONS
HISTORICAL
|RG|ST| NAME | LOCATION
III 1
|05|IL|DEAD CREEK |SAUGET
Ml I
Ml I
Ml 1
Ml 1
| 05 |IL| FLOYD HUTTER [WILL COUNTY
Ml 1
Ml I
|NPL| INCIDENT
| | CATEGORY
N [INACTIVE WASTE MANAGEMENT
1
1
1
1
N [TRANSPORTATION-RELATED
1
1
| THREATS
1
FACILITY|DIRECT CONTACT
|AIR CONTAMINATION
IGROUNDUATER CONTAMINATION
ISOIL CONTAMINATION
1
IDIRECT CONTACT
1
1
| MITIGATIVE ACTIONS
1
[SECURITY
1
1
1
1
[MIGRATION CONTROL
|SAMPLING,ANALYSIS
1
| COST |
|$(000)|
|$ 31 1
1 1
1 1
1 1
1 1
|$ 1|
I I
I I
1 05
1 05
I".
IL
GEBHART FERTILIZER
HIXON PLATING
LATHAM
BUSHNELL
N
N
INACTIVE PRODUCTION FACILITY [DIRECT CONTACT (DISPOSAL |$ 106[
[FIRE/EXPLOSION [REPACKED DRUMS | |
[DRINKING WATER CONTAMINATION [ORGANIZED MATERIALS | |
I [BULKED MATERIALS | |
I [SECURITY | |
I |SAMPLING,ANALYSIS | |
I I II
INACTIVE PRODUCTION FACILITY [DIRECT CONTACT [DISPOSAL |$ 33|
[FIRE/EXPLOSION [REPACKED DRUMS | |
[AIR CONTAMINATION [ORGANIZED MATERIALS | |
I [SOLIDIFIED MATERIALS | |
I [NEUTRALIZED MATERIALS | |
I (SECURITY | |
I | SAMPLING, ANALYSIS | |
I I II
-------
SUPERFUND EMERGENCY RESPONSE ACTIONS
HISTORICAL
|RG|ST| NAME | LOCATION |NPL| INCIDENT | THREATS | MITIGATIVE ACTIONS
III 1 II CATEGORY | |
|05|IL|LASALLE ELECTRIC UTILITIES
1 1 1
1 1 1
1 1 1
1 1 1
1 1 1
1 1 1
1 1 1
1 1 1
|05|IL|LIQUID DYNAMICS
1 1 1
1 1 1
1 1 1
1 1 1
1 1 1
1 1 1
1 1 1
| COST |
[$(000) |
LASALLE | Y (INACTIVE PRODUCTION FACILITY [DIRECT CONTACT [DISPOSAL |$
|| | SOIL CONTAMINATION [CAPPED |
|| | [ORGANIZED MATERIALS |
| | | [CONTAMINANT CONTAINMENT/RETENTION |
| | | [MIGRATION CONTROL |
| | | [SECURITY |
|| | [RESTORATION |
| | | [SAMPLING, ANALYSIS |
II 1 1 1
SOUTHSIDE CHICA] N [INACTIVE WASTE MANAGEMENT FACILITY|DIRECT CONTACT [DISPOSAL |$
| | [FIRE/EXPLOSION [ORGANIZED MATERIALS |
|| | [SOLIDIFIED MATERIALS |
| | | [CONTAMINANT CONTAINMENT/RETENTION]
| | | [EXCAVATION |
| | | [SECURITY |
| | | [RESTORATION |
| | | [SAMPLING, ANALYSIS |
228 1
1
1
1
1
1
1
1
1
138|
I
I
I
I
I
I
I
-------
SUPERFUND EMERGENCY RESPONSE ACTIONS
HISTORICAL
|RG|ST| NAME
1 1 1
|05|IL| SORRENTO SITE
1 1 1
1 1 1
1 1 1
1 1 1
| 05 |IL| STEWART DRUM
1 1 1
|05|IL|US SCRAP
1 1 1
III
1 1 1
1 1 1
1 1 1
|05| IN (ABANDONED DRUM-CG
1 1 1
1 1 1
| LOCATION |NPL| INCIDENT
| | | CATEGORY
(SORRENTO
1
1
1
1
(CHICAGO
1
(CHICAGO
1
1
1
1
1
(OHIO RIVER
1
1
THREATS | MITIGATIVE ACTIONS
1
N (MIDNIGHT DUMP (DRINKING WATER CONTAMINATION (DISPOSAL
| (SURFACE WATER CONTAMINATION (REPACKED DRUMS
| (SOIL CONTAMINATION (EXCAVATION
1
1
(SAMPLING, ANALYSIS
1
N (MIDNIGHT DUMP (DIRECT CONTACT (SAMPLING, ANALYSIS
1
1
N (INACTIVE WASTE MANAGEMENT FACILITY (FIRE/EXPLOSION (DISPOSAL
1
1
1
|
1
N (MIDNIGHT DUMP
1
1
(CAPPED
(EXTINGUISHED FIRE
(SECURITY
(SAMPLING, ANALYSIS
1
DIRECT CONTACT (DISPOSAL
SURFACE WATER CONTAMINATION (SAMPLING.ANALYSIS
1
| COST |
|$(000)|
|$ 3|
1 1
1 1
1 1
1 1
|$ 10|
1 1
|$ 536 |
1 1
1 1
1 1
1 1
1 1
|$ 1|
I I
I I
-------
SUPERFUND EMERGENCY RESPONSE ACTIONS
HISTORICAL
|RG|ST| NAME | LOCATION
II 1
(05 (IN (BENNETT STONE QUARRY | BLOOMINGTON
1 1
1 1
1 1
1 1
1 1
1 1
1 1
|05|IN|BLOOMINGTON CAPACITOR SITE | BLOOMINGTON
III 1
III 1
III 1
1 1 1
1 1 1
|05|IN|DOUDEN LANDFILL | FORTVILLE
III 1
III 1
NPL| INCIDENT
| CATEGORY
N*| INACTIVE WASTE MANAGEMENT
1
1
1
1
1
1
N (INACTIVE WASTE MANAGEMENT
-
N (OTHER
I
1
| THREATS
1
FACILITY (FOOD CHAIN CONTAMINATION
(SURFACE WATER CONTAMINATION
| GROUNDWATER CONTAMINATION
(SOIL CONTAMINATION
1
1
1
1
FACILITY (DIRECT CONTACT
(SOIL CONTAMINATION
1
1
1
1
(DRINKING WATER CONTAMINATION
| GROUNDWATER CONTAMINATION
1
| MITIGATIVE ACTIONS | COST |
| |&(000)|
(DISPOSAL |* 182|
(ORGANIZED MATERIALS | |
(CAPPED | |
(EXCAVATION | |
(SECURITY | |
(RESTORATION | |
| SAMPLING, ANALYSIS | |
I I I
(DISPOSAL |* 54 |
(CAPPED | |
(MIGRATION CONTROL | |
(EXCAVATION | |
| SAMPLING, ANALYSIS | |
I I I
(WATER SUPPLIED |$ 20 |
[SAMPLING, ANALYSIS | |
I II
NOTE: NON-NPL SITE AT INITIATION OF REMOVAL. HOWEVER, CURRENTLY ON PROPOSED OR FINAL NPL.
-------
SUPERFUND EMERGENCY RESPONSE ACTIONS
HISTORICAL
RG|ST| NAME | LOCATION |NPL| INCIDENT
1 1
05|IN|ELKHART SITE (ELKHART
1
1
05|IN|ENVIROCHEM CORP. |ZIONSVILLE
1 05 1 IN (GARY DOG POUND [GARY
1 1
1 1
1 1
1
1
1
II! 1
1 1 1
1 1 1
CATEGORY
THREATS | MITIGATIVE ACTIONS | COST |
| ($(000) |
N | OTHER (DRINKING WATER CONTAMINATION (WATER SUPPLIED |$ 91 1
| IGROUNDUATER CONTAMINATION (SAMPLING, ANALYSIS
I
I I I
Y (INACTIVE WASTE MANAGEMENT FACILITY (DIRECT CONTACT (DISPOSAL |$ 1918|
(DRINKING WATER CONTAMINATION (REPACKED DRUMS
IFIRE/EXPLOSION (PUMPED OUT CONTAMINANTS
(SURFACE WATER CONTAMINATION (ORGANIZED MATERIALS
(CAPPED
(SOLIDIFIED MATERIALS
(MIGRATION CONTROL
(EXCAVATION
(SECURITY
(RESTORATION
(SAMPLING, ANALYSIS
I
N (INACTIVE WASTE MANAGEMENT FACILITY (DIRECT CONTACT (DISPOSAL |$ 25 1
I
I
I
I
I
I
(ORGANIZED MATERIALS
[PUMPED OUT CONTAMINANTS
(EXCAVATION |
(SECURITY ' |
(SAMPLING, ANALYSIS |
I I
-------
SUPERFUND EMERGENCY RESPONSE ACTIONS
HISTORICAL
|RG|ST| NAME
1 1 1
|05|IN|I-69
1 1 1
I 1 1
1 1 1
|05| IN | INDIANA REFINERY
1 1 1
1 1 I
1 1 I
1 1 1
| 05 | IN [LAKE SANDY JO (M&M LANDFILL)
1 1 1
1 1 1
Ml
1 1 1
|05|IN|LEMON LANE LANDFILL
1 1 1
III
1 1 1
| LOCATION |NPL| INCIDENT | THREATS
| | | CATEGORY |
| FISHERS
1
1
1
[PRINCETON
1
1
1
1
IGARY
1
1
1
1
IBLOOHINGTON
1
1
1
N IMIDNIGHT DUMP [DIRECT CONTACT
1 1
1 1
1 1
N [INACTIVE PRODUCTION FACILITY [DIRECT CONTACT
Y
Y
[FIRE/EXPLOSION
1
1
1
INACTIVE WASTE MANAGEMENT FACILITY|DIRECT CONTACT
[SURFACE WATER CONTAMINATION
[GROUNDWATER CONTAMINATION
[SOIL CONTAMINATION
1
INACTIVE WASTE MANAGEMENT FACILITY [DIRECT CONTACT
[GROUNDWATER CONTAMINATION
[SOIL CONTAMINATION
1
| MITIGATIVE ACTIONS
1
[DISPOSAL
[EXCAVATION
[SAMPLING, ANALYSIS
1
[DISPOSAL
[REPACKED DRUMS
[SECURITY
[SAMPLING, ANALYSIS
1
[SECURITY
[RESTORATION
1
1
1
[MIGRATION CONTROL
[SECURITY
[SAMPLING, ANALYSIS
1
| COST |
[$(000) |
|$ 16|
I I
I I
I I
|S 39 1
I I
I I
I I
I I
|$ 33 1
I I
I I
I I
I I
|S 23 1
| |
I I
I I
-------
SUPERFUND EMERGENCY RESPONSE ACTIONS
HISTORICAL
|RG|ST| NAME | LOCATION
1 I 1
f 05 | IN (MEYERS DUMP | SOUTH BEND
1 1
1 1
1 1
1 1 1
1 I 1
|05| IN (MICHIGAN CITY DRUMS (MICHIGAN CITY
Ml 1
III 1
III 1
III 1
|05|IN|MIDCO I (GARY
1 1
1 1
1 1
1 1
1 1
1 1
1 1
NPL| INCIDENT
| CATEGORY
N (INACTIVE WASTE MANAGEMENT
1
1
1
1
1
N (MIDNIGHT DUMP
1
1
1
1
N*| INACTIVE WASTE MANAGEMENT
1
1
1
1
1
1
1
( THREATS
1
FACILITY (DIRECT CONTACT
(FIRE/EXPLOSION
IGROUNDWATER CONTAMINATION
(SOIL CONTAMINATION
1
1
(FIRE/EXPLOSION
1
1
1
1
FACILITY (DIRECT CONTACT
IFIRE/EXPLOSION
(DRINKING WATER CONTAMINATION
(AIR CONTAMINATION
[SURFACE WATER CONTAMINATION
IGROUNDWATER CONTAMINATION
|SOIL CONTAMINATION
1
| MITIGATIVE ACTIONS
1
(DISPOSAL
(ORGANIZED MATERIALS
(EXCAVATION
(RESTORATION
(SAMPLING, ANALYSIS
1
(DISPOSAL
(MIGRATION CONTROL
(EXCAVATION
(SAMPLING, ANALYSIS
1
(DISPOSAL
(PUMPED OUT CONTAMINANTS
(ORGANIZED MATERIALS
(CAPPED
(EXCAVATION
(SECURITY
(SAMPLING, ANALYSIS
1
COST |
$(000) |
$ 73|
1
1
1
1
1
$ 15|
1
1
1
1
$ 909 1
1
1
1
1
1
1
1
* NOTE: NON-NPL SITE AT INITIATION OF REMOVAL. HOWEVER, CURRENTLY ON PROPOSED OR FINAL NPL.
-------
SUPERFUND EMERGENCY RESPONSE ACTIONS
HISTORICAL
|RG|ST| NAME LOCATION |NPL| INCIDENT | THREATS
II II CATEGORY |
|05|IN|MIDUEST PLATING [LOGANSPORT
1
1 1
1 1
1 1 1
1
1
|05|IN|POER FARM | HANCOCK COUNTY
|05|IN|R.J. TRUCKING [PRINCETON
1
1
N [INACTIVE PRODUCTION FACILITY [DIRECT CONTACT
1
1
1
1
1
1
N*| INACTIVE PRODUCTION FACILITY [DIRECT CONTACT
IFIRE/EXPLOSION
[AIR CONTAMINATION
[GROUNDWATER CONTAMINATION
[SOIL CONTAMINATION
1
1
N IOTHER [FIRE/EXPLOSION
1
1 ' 1
1
| MITIGATIVE ACTIONS
1
[DISPOSAL
[PUMPED OUT CONTAMINANTS
[ORGANIZED MATERIALS
[EXCAVATION
[SECURITY
[SAMPLING, ANALYSIS
1
[DISPOSAL
[REPACKED DRUMS
[ORGANIZED MATERIALS
[SOLIDIFIED MATERIALS
[BULKED MATERIALS
[SAMPLING, ANALYSIS
1
| COST |
|$COOO)|
|$ 846 1
I I
I I
I I
I I
I I
I I
|$ 83 1
I I
I I
I I
I I
I I
I I
[CONTAMINANT CONTAINMENT/RETENTION |$ 17|
[SECURITY
[SAMPLING, ANALYSIS
I
I I
I I
I I
NOTE: NON-NPL SITE AT INITIATION OF REMOVAL. HOWEVER, CURRENTLY ON PROPOSED OR FINAL NPL.
-------
SUPERFUND EMERGENCY RESPONSE ACTIONS
HISTORICAL
|RG|ST| NAME | LOCATION
Mi 1
| 05 | IN | SEYMOUR RECYCLING CORP. [SEYMOUR
1 1
1 1
1 1
1 1
1 1
1 1 1
1 i 1
| 05 | IN | STEEL CONTAINER | HAMMOND
III 1
III 1
III 1
III 1
III 1
III 1
III 1
|05 |MI| ABANDONED DRUMS- ECORSE [ECORSE
III 1
III 1
III 1
III 1
NPL|
1
N*| INACTIVE
1
1
1
1
1
1
1
N | INACTIVE
1
1
1
1
1
1
1
N (MIDNIGHT
1
1
1
1
INCIDENT | THREATS
CATEGORY |
WASTE MANAGEMENT FACILITY|FIRE/EXPLOSION
|AIR CONTAMINATION
|SOIL CONTAMINATION
(SURFACE WATER CONTAMINATION
| GROUNDWATER CONTAM I NAT I ON
1
1
1
PRODUCTION FACILITY | DIRECT CONTACT
IFIRE/EXPLOSION
| SURFACE WATER CONTAMINATION
[SOIL CONTAMINATION
1
1
1
1
DUMP [DRINKING WATER CONTAMINATION
[SURFACE WATER CONTAMINATION
1
1
1
| MITIGATIVE ACTIONS
1 1
[DISPOSAL
(ORGANIZED MATERIALS
[SOLIDIFIED MATERIALS
[MIGRATION CONTROL
[SECURITY
[RESTORATION
[SAMPLING, ANALYSIS
1
[DISPOSAL
[ORGANIZED MATERIALS
[WRONG CODE: CL
[BULKED MATERIALS
[MIGRATION CONTROL
[SECURITY
|SAMPLING,ANALYSIS
1
[DISPOSAL
[REPACKED DRUMS
| SECURITY
|SAMPLING,ANALYSIS
1
COST |
$( 000)|
$ 886 1
$ 293 j
1
1
1
1
1
$ 6|
1
-------
SUPERFUND EMERGENCY RESPONSE ACTIONS
HISTORICAL
|RG|ST| NAME LOCATION |NPL| INCIDENT
|| || CATEGORY
THREATS | MITIGATIVE ACTIONS
1
05|MI (BERLIN & FARRO |SWARTZ CREEK | Y [INACTIVE WASTE MANAGEMENT FACILITY (DIRECT CONTACT [DISPOSAL
II III
III 1
III 1
III 1
1 1 -1 1
1 1 1 1
III 1
1 1 1
05 |MI (CHEMICAL DRUM-CG (HESSEL
1 1 1
1 1 1
05 | HI | DRUMS ON BEACH- CG [MANISTIQUE
III 1
Ml 1
1
1
1
1
1
1
1
AIR CONTAMINATION [REPACKED DRUMS
GROUNDWATER CONTAMINATION [ORGANIZED MATERIALS
SOIL CONTAMINATION [NEUTRALIZED MATERIALS
SURFACE WATER CONTAMINATION [MIGRATION CONTROL
(EXCAVATION
(SECURITY
(SAMPLING, ANALYSIS
1
N (MIDNIGHT DUMP (AIR CONTAMINATION [DISPOSAL
| [DIRECT CONTACT [REPACKED DRUMS
1
1
N [MIDNIGHT DUMP (DIRECT CONTACT (DISPOSAL
1
1
(REPACKED DRUMS
1
|05|HI|DUELL AND GARDNER LANDFILL (DALTON TOWNSHIP) Y [INACTIVE WASTE MANAGEMENT FACILITY [DIRECT CONTACT [DISPOSAL
1 1 1
1 1 1
1 1 1
1 1 1
1 1 1
1
1
1
1
1
1
[ORGANIZED MATERIALS
[BULKED MATERIALS
| COST |
|S(000)|
|$ 800 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
|$ 4|
1 1
1 1
|$ 3|
1 1
1 1
|$ 104|
1 1
1 1
(CONTAMINANT CONTAINMENT/RETENTION) |
(MIGRATION CONTROL
(EXCAVATION
(SECURITY
(SAMPLING, ANALYSIS
1
1 1
1 1
1 1
1 1
1 1
-------
SUPERFUND EMERGENCY RESPONSE ACTIONS
HISTORICAL
RG|ST| NAME
1
LOCATION |NPL| INCIDENT | THREATS | MITIGATIVE ACTIONS
COST |
| | CATEGORY | | ($(000) |
05|HI|EAST BAY SITE [TRAVERSE CITY
1 1 1
III 1
III 1
05|MI|FORT & SCOTTEN STREETS [DETROIT
1 1
1 1
I
|05|HI| INTERNATIONAL DISC CORP [ELLSWORTH
|05 |HI [LIQUID DISPOSAL, INC [UTICA
N [OTHER (DIRECT CONTACT [WATER SUPPLIED |$ 138|
| [DRINKING WATER CONTAMINATION | | |
| [GROUNDWATER CONTAMINATION | |
I III
N [MIDNIGHT DUMP [DIRECT CONTACT (DISPOSAL |$ 9|
| [SOIL CONTAMINATION (REPACKED DRUMS
[ORGANIZED MATERIALS
| SAMPLING, ANALYSIS
I I
I
I
I
I
N [INACTIVE PRODUCTION FACILITY [DIRECT CONTACT [DISPOSAL |$ 20 1
| [SECURITY | |
I I I
Y (ACTIVE WASTE MANAGEMENT FACILITY [DIRECT CONTACT [DISPOSAL |$ 4054|
(FIRE/EXPLOSION [REPACKED DRUMS
(GROUNDWATER CONTAMINATION [PUMPED OUT CONTAMINANTS
(SURFACE WATER CONTAMINATION [CAPPED
[EXTINGUISHED FIRE
(SOLIDIFIED MATERIALS
(MIGRATION CONTROL
(EXCAVATION
(RELOCATION/EVACUATION
[RESTORATION
| SAMPLING, ANALYSIS
I
-------
SUPERFUND EMERGENCY RESPONSE ACTIONS
HISTORICAL
|RG|ST| NAME | LOCATION |NPL| INCIDENT
1 1
| | CATEGORY
THREATS | MITIGATIVE ACTIONS
COST |
| ($(000) |
|05|HI (MIDNIGHT DUMP ING -DETROIT (DETROIT | N (MIDNIGHT DUMP (DIRECT CONTACT (DISPOSAL |$ 24|
1 | | (AIR CONTAMINATION (ORGANIZED MATERIALS |
1 II IGROUNDWATER CONTAMINATION (SAMPLING .ANALYSIS |
| | (SURFACE WATER CONTAMINATION | |
1 I | (SOIL CONTAMINATION j |
1
|05|MI|HILLPOINT (SPRING LAKE) (SPRING LAKE
1 1 1
1 1 1
|05|MI|NILES TOWNSHIP (NILES TOWNSHIP
III 1
1 1 1
05|MI|NORTHERNAIRE PLATING (CADILLAC
1
1
1
1
1
1
1
1
1
N (MIDNIGHT DUMP (DIRECT CONTACT (DISPOSAL |S 3|
| (SURFACE WATER CONTAMINATION (SAMPLING .ANALYSIS
1
1
1
1
N (OTHER (DRINKING WATER CONTAMINATION (WATER SUPPLIED |S 16|
I IGROUNDWATER CONTAMINATION (SAMPLING, ANALYSIS | |
1
1
1
Y (INACTIVE PRODUCTION FACILITY (DIRECT CONTACT (DISPOSAL |S U0|
1 [FIRE/EXPLOSION (REPACKED DRUMS
1 (AIR CONTAMINATION (ORGANIZED MATERIALS
I (DRINKING WATER CONTAMINATION (SOLIDIFIED MATERIALS
I IGROUNDWATER CONTAMINATION (BULKED MATERIALS
| (SOIL CONTAMINATION (MIGRATION CONTROL
1 1
1
1 1
1 1
I 1
| WATER SUPPLIED
(EXCAVATION
(SECURITY
(SAMPLING, ANALYSIS
1
1
1
1
1
1
1
1
1
1
1
-------
SUPERFUND EMERGENCY RESPONSE ACTIONS
HISTORICAL
RG|ST| NAME |
1 1
LOCATION |NPL| INCIDENT | THREATS | MITIGATIVE ACTIONS | COST |
| | CATEGORY | 1 I$<°°°M
|05|MI|OTT/STORY/CORDOVA (DALTON TOWNSHIP| N*|INACTIVE WASTE MANAGEMENT FACILITYjFIRE/EXPLOSION (DISPOSAL |$ 267|
I
05|MI|PBM ENTERPRISES (ROMULUS
N
(DRINKING WATER CONTAMINATION (MIGRATION CONTROL |
(SURFACE WATER CONTAMINATION (WATER SUPPLIED |
(GROUNDWATER CONTAMINATION (SAMPLING.ANALYSIS |
(SOIL CONTAMINATION |
INACTIVE PRODUCTION FACILITY (DIRECT CONTACT (DISPOSAL |$ 714|
(AIR CONTAMINATION (BULKED MATERIALS | |
(SOIL CONTAMINATION (CONTAMINANT CONTAINMENT/RETENTION)
| (EXCAVATION
| (SECURITY |
| (RESTORATION
] (SAMPLING, ANALYSIS
1 1
(05(MI(PEERLESS PLATING
IMUSKEGON
N (INACTIVE PRODUCTION FACILITY
I
I
(DIRECT CONTACT
(FIRE/EXPLOSION
(AIR CONTAMINATION
(DISPOSAL
(REPACKED DRUMS
(ORGANIZED MATERIALS
|SAMPLING.ANALYSIS
I
131|
NOTE: NON-NPL SITE AT INITIATION OF REMOVAL. HOWEVER, CURRENTLY OH PROPOSED OR FINAL NPL.
-------
SUPERFUND EMERGENCY RESPONSE ACTIONS
HISTORICAL
|RG|ST| NAME | LOCATION
i 1
| 05 | M I | RASMUSSEN ' S DUMP | GREEN OAK TWP .
1 1 1
1 1 1
1 1 1
1 1 I
1 1
|05|MI|ROSE TOWNSHIP DUMP |ROSE TOWNSHIP
1 1
1 1 I
II 1
|05|MI|SAGINAW PAINTING CO [SAGINAW
1 1
1 1
1 1
1 1
1 1
|NPL| INCIDENT | THREATS
| CATEGORY |
Y [INACTIVE WASTE MANAGEMENT FACILITY|DIRECT CONTACT
I IFIRE/EXPLOSION
| |SOIL CONTAMINATION
1 1
1 1
1 1
Y [INACTIVE WASTE MANAGEMENT FACILITY|DIRECT CONTACT
[FOOD CHAIN CONTAMINATION
1
1
N INACTIVE PRODUCTION FACILITY [DIRECT CONTACT
[FIRE/EXPLOSION
1
1
1
1
| MITIGATIVE ACTIONS | COST |
| |$<000)|
[DISPOSAL |$ 506 |
[ORGANIZED MATERIALS | |
[EXCAVATION . | |
[SECURITY | |
[SAMPLING, ANALYSIS | |
1 I 1
[ORGANIZED MATERIALS |$ 76|
[SECURITY | |
ISAMPLING, ANALYSIS | |
1 I 1
[DISPOSAL |$ 86 |
[REPACKED DRUMS | |
[BULKED MATERIALS | |
[SECURITY | |
|SAMPLING,ANALYSIS | |
1 1 1
-------
SUPERFUND EMERGENCY RESPONSE ACTIONS
HISTORICAL
|RG|ST| NAME | LOCATION |NPL| INCIDENT
I 1 1 1
|05|HN|BOW CHEMICAL |ST PAUL PARK
1 1 1
1 1 1
1 1 1
1 1 1
1 1 1
1 1 !
I 1 1
|05|HN|ISANTI SOLVENT SITES (ISANTI COUNTY
1 1 1
1 1 1
III 1
III 1
Ml 1
| CATEGORY
N (OTHER
1
1
1
1
1
1
1
N (INACTIVE PRODUCTION FACILITY
1
1
1
1
1
|05|HN|LEHILLIER/HANKATO SITE |LEHILLIER/MANKA| Y |OTHER
III II
III II
| THREATS
1
(DIRECT CONTACT
(FIRE/EXPLOSION
(GROUNDWATER CONTAMINATION
1
1
1
1
1
(DIRECT CONTACT
(FIRE/EXPLOSION
(DRINKING WATER CONTAMINATION
| GROUNDWATER CONTAMINATION
(SOIL CONTAMINATION
1
(DRINKING WATER CONTAMINATION
| GROUNDWATER CONTAM I NAT I ON
1
j MITIGATIVE ACTIONS | COST
( ($(000) |
(DISPOSAL |$ 51
(REPACKED DRUMS |
(ORGANIZED MATERIALS |
[CONTAMINANT CONTAINMENT/RETENTION |
(EXCAVATION |
(SECURITY |
(SAMPLING, ANALYSIS |
I I
(DISPOSAL |$ 578 |
(BULKED MATERIALS |
ISAMPLING, ANALYSIS |
I i I
I I I
I I I
(WATER SUPPLIED |$ 21]
| SAMPLING, ANALYSIS |
I I I
-------
SUPERFUND EMERGENCY RESPONSE ACTIONS
HISTORICAL
|RG|ST| NAME
I 1 1
| 05 |MN| RUMPLE JUNKYARD
III
1 1 1
1 1 1
1 1 1
1 1 1
1 1 1
1 1 1
1 1 1
1 1 1
|05|MN|ST LOUIS RIVER-CG
1 1 1
1 1 1
| 05 |MN [UNION SCRAP IRON AMD METAL CO.
1 1 1
1 1 1
1 1 I
| LOCATION |NPL| INCIDENT
I | | CATEGORY
IISANTI
1
1
1
1
1
1
1
1
1
IDULUTH HARBOR
1
1
[MINNEAPOLIS
1
1
1
THREATS
N [INACTIVE WASTE MANAGEMENT FACILITY (DIRECT CONTACT
[FIRE/EXPLOSION
N [MIDNIGHT DUMP [DIRECT CONTACT
[SURFACE WATER CONTAMINATION
1
Y [INACTIVE PRODUCTION FACILITY [DIRECT CONTACT
I [AIR CONTAMINATION
1
| MITIGATIVE ACTIONS
1
[DISPOSAL
[REPACKED DRUMS
[ORGANIZED MATERIALS
[CAPPED
IPUMPED OUT CONTAMINANTS
[EXCAVATION
[SECURITY
[RESTORATION
[SAMPLING, ANALYSIS
1
[SAMPLING, ANALYSIS
[REPACKED DRUMS
1
| COST |
|$(000)|
|$ 177|
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1* 11
I I
I I
[CONTAMINANT CONTAINMENT/RETENTION |S 30|
[MIGRATION CONTROL
[SECURITY
1
I I
I I
I I
-------
SUPERFUND EMERGENCY RESPONSE ACTIONS
HISTORICAL
|RG|ST| NAME | LOCATION |NPL|
III 1 II
|05|OH|AEROQUIP/REPUBLIC HOSE [YOUNGSTOWN
III 1
III 1
III 1
III 1
|05|OH [AMERICAN STEEL DRUM [BEDFORD
III 1
III 1
III 1
III 1
III 1
III 1
| 05 | OH | ANACONDA ROAD SITE [AKRON
III 1
III 1
III 1
III 1
III 1
INCIDENT | THREATS
CATEGORY |
N [ACTIVE WASTE MANAGEMENT FACILITY [DIRECT CONTACT
1
1
1
1
N [INACTIVE
1
1
1
1
1
1
N [INACTIVE
1
1
1
1
1
[SURFACE WATER CONTAMINATION
1
1
1
PRODUCTION FACILITY [DIRECT CONTACT
[SURFACE WATER CONTAMINATION
|SOIL CONTAMINATION
1
1
1
1
WASTE MANAGEMENT FACILITY[DIRECT CONTACT
[FIRE/EXPLOSION
[GROUNDWATER CONTAMINATION
[SOIL CONTAMINATION
1
1
| MITIGATIVE ACTIONS
| COST |
| [$(000) |
[DISPOSAL
[ORGANIZED MATERIALS
[REPACKED DRUMS
[STORAGE
1
[DISPOSAL
[SOLIDIFIED MATERIALS
[BULKED MATERIALS
[EXCAVATION
[SECURITY
[SAMPLING, ANALYSIS
1
[DISPOSAL
| PUMPED OUT CONTAMINANTS
[SOLIDIFIED MATERIALS
[REPACKED DRUMS
|SAMPLING,ANALYSIS
1
|$
1
1
1
1
|$
1
1
1
1
1
1
|$
1
1
1
1
1
394 1
1
1
1
1
472 1
1
1
1
1
1
1
38 1
1
1
1
1
1
-------
SUPERFUND EMERGENCY RESPONSE ACTIONS
HISTORICAL
|RG|ST| NAME
1 1 1
| LOCATION |NPL|
1 1 1
INCIDENT
CATEGORY
| THREATS | HITIGATIVE ACTIONS | COST |
I I |$(000)|
|05|OH|CHEM-DYNE
1
1
1
1
1
1
1
1
1
1
1
1
1
1
[05 [OH (CHEMICAL MINERALS RECLAMATION
1
1
1
1
1
1
1
1
1
1
1
1
(HAMILTON
1
1
1
1
1
1
1
1
[CLEVELAND
1
1
1
1
1
1
Y [INACTIVE WASTE MANAGEMENT FACILITY [DIRECT CONTACT
[FIRE/EXPLOSION
[SURFACE WATER CONTAMINATION
[SOIL CONTAMINATION
1
1
1
1
1
N [INACTIVE PRODUCTION FACILITY [AIR CONTAMINATION
| (SOIL CONTAMINATION
| (FIRE/EXPLOSION
( (GROUNDWATER CONTAMINATION
( [SURFACE WATER CONTAMINATION
1
1
[DISPOSAL
(PUMPED OUT CONTAMINANTS
(SOLIDIFIED MATERIALS
|$
1
1
108|
I
I
[CONTAMINANT CONTAINMENT/RETENTION | |
[MIGRATION CONTROL
[EXCAVATION
[SECURITY
[SAMPLING, ANALYSIS
1
[DISPOSAL
[ORGANIZED MATERIALS
(BULKED MATERIALS
[EXCAVATION
[SECURITY
[SAMPLING, ANALYSIS
1
1
1
1
1
1
|$
1
1
4
1
1
1
I
I
I
I
I
418|
I
I
I
I
I
I
|05|OH|GP & K, INC.
|MENTOR
N [INACTIVE PRODUCTION FACILITY
[DIRECT CONTACT
ISOIL CONTAMINATION
[SURFACE WATER CONTAMINATION
[CONTAMINANT CONTAINMENT/RETENTION|$
|SAMPLING,ANALYSIS |
9|
-------
SUPERFUND EMERGENCY RESPONSE ACTIONS
HISTORICAL
|RG|ST| NAME
1 1 1
|05|OH|GREINERS LAGOON
1 1 I
1 1 1
1 1 1
1 1 1
1 1 1
1 1 1
|05|OH|HYTECH CHROME
1 1 I
1 1 I
1 1 !
|05|OH|J.C. HAYNES
1 1 1
1 1 1
1 1 1
1 1 1
| LOCATION |NPL|
1 1 1
| FREMONT
1
1
1
1
1
i
(LOGAN
1
1
1
(NEWARK
1
1
|
1
N (INACTIVE
1
1
1
1
1
1
N (INACTIVE
1
1
1
INCIDENT | THREATS
CATEGORY |
WASTE MANAGEMENT FACILITY (GROUNDWATER CONTAMINATION
(SOIL CONTAMINATION
1
1
1
1
1
PRODUCTION FACILITY (DIRECT CONTACT
(AIR CONTAMINATION
1
1
N (ACTIVE PRODUCTION FACILITY (DIRECT CONTACT
1
1
1
1
(FIRE/EXPLOSION
(AIR CONTAMINATION
1
1
| MITIGATIVE ACTIONS
1
(PUMPED OUT CONTAMINANTS
(CAPPED
| COST |
($(000) |
|$ 96 1
1 1
(CONTAMINANT CONTAINMENT/RETENTION] |
(EXCAVATION
(SECURITY
(RESTORATION
1
(DISPOSAL
(REPACKED DRUMS
(SECURITY
1
(DISPOSAL
1 1
1 1
1 1
1 1
|$ 10|
I I
I I
I I
|S 366|
(CONTAMINANT CONTAINMENT/RETENTION) |
(EXCAVATION
ISAMPLING.ANALYSIS
1
I I
I I
I I
-------
SUPERFUND EMERGENCY RESPONSE ACTIONS
HISTORICAL
|RG|ST| NAME | LOCATION |NPL| INCIDENT | THREATS
III 1
05|OH|J.V. PETERS (MIDDLEFIELD
III 1
III 1
III 1
III 1
III 1
| CATEGORY |
N (INACTIVE WASTE MANAGEMENT FACILITY|DIRECT CONTACT
( (FIRE/EXPLOSION
| (DRINKING WATER CONTAMINATION
| (GROUNDWATER CONTAMINATION
| (SOIL CONTAMINATION
1 1
05|OH|LASKIN/POPLAR OIL CO. (JEFFERSON TOWNS) Y (INACTIVE PRODUCTION FACILITY (DIRECT CONTACT
1 1 1
II 1
II 1
1 1 1
1 1 1
II 1
1 1 1
1 1 1
05 (OH (OLD MILL (ROCK CREEK
1 1 1
1 1 1
1 1 1
1 1 1
1 1 1
1 1 1
Y
(DRINKING WATER CONTAMINATION
(FOOD CHAIN CONTAMINATION
(SURFACE WATER CONTAMINATION
1 ..
1
1
1
1
INACTIVE WASTE MANAGEMENT FACILITY (DIRECT CONTACT
(FIRE/EXPLOSION
(AIR CONTAMINATION
[SURFACE WATER CONTAMINATION
| GROUNDWATER CONTAMINATION
(SOIL CONTAMINATION
1
| MITIGATIVE ACTIONS
1
(DISPOSAL
(SOLIDIFIED MATERIALS
(PUMPED OUT CONTAMINANTS
(EXCAVATION
(SAMPLING, ANALYSIS
1
(DISPOSAL
(CAPPED
(SOLIDIFIED MATERIALS
| COST |
($(000) |
|$ 174|
1 1
1 1
1 1
1 1
1 1
|$ 1514)
I I
I I
(CONTAMINANT CONTAINMENT/RETENTION] |
(MIGRATION CONTROL
(EXCAVATION
(SECURITY
(SAMPLING, ANALYSIS
1
(DISPOSAL
(MIGRATION CONTROL
(EXCAVATION
(SECURITY
(SAMPLING, ANALYSIS
1
1
I I
I I
I I
I I
I I
|$ 117|
1 1
1 1
1 1
1 1
1 1
1 1
-------
SUPERFUND EMERGENCY RESPONSE ACTIONS
HISTORICAL
|RG|ST| NAME | LOCATION
1 1
NPL| INCIDENT | THREATS | MITIGATIVE ACTIONS
| CATEGORY | |
COST
$(000)
|05|OH|RASER TANNERY (ASHTABULA | N (INACTIVE PRODUCTION FACILITY |DIRECT CONTACT (DISPOSAL |$ 26
1 1 1 IFIRE/EXPLOSION (PUMPED OUT CONTAMINANTS
1 II | (EXTINGUISHED FIRE
1 1 I (BULKED MATERIALS
1 1 | (MIGRATION CONTROL
1 II I (RELOCATION/EVACUATION
1 II 1 I
|05|OH|SEAWAY WAREHOUSE (WASHINGTON COUR
1 1
1 1
1
1 1
1 1
|05|OH|SKILJAN/DIAL (CLEVELAND
Ml 1
1 1 1 I
1 1
1 1 1
N (MIDNIGHT DUMP (DIRECT CONTACT (DISPOSAL
(SURFACE WATER CONTAMINATION (CONTAMINANT CONTAINMENT/RETENTION
(SOIL CONTAMINATION (MIGRATION CONTROL
(ECOLOGICAL DAMAGE (EXCAVATION
I (SAMPLING, ANALYSIS
1 \
$ 28|
N (INACTIVE PRODUCTION FACILITY (DIRECT CONTACT (DISPOSAL |$ 569|
I (SURFACE WATER CONTAMINATION (EXCAVATION |
I IGROUNDWATER CONTAMINATION (SAMPLING, ANALYSIS |
(SOIL CONTAMINATION | |
1 1 1
-------
SUPERFUND EMERGENCY RESPONSE ACTIONS
HISTORICAL
|RG|ST| NAME
1 1 1
|05 [OH (SUMMIT NATIONAL
1 1 1
III
1 1 1
1 1 1
1 1 1
|05|OH|T. P. LONG
III
1 1 1
III
1 1 1
III
1 1 1
1 1 1
1 05 1 OH | UN I TED SCRAP LEAD CO
1 1 1
1 1 1
1 1 1
1 1 1
LOCATION
DEERFIELD TWP
AKRON
TROY
|NPL|
1 1
N*| INACTIVE
1
1
1
1
1
N | INACTIVE
Y [INACTIVE
1
1
1
1
INCIDENT | THREATS
CATEGORY |
WASTE MANAGEMENT FACILITY (FIRE/EXPLOSION
(DRINKING WATER CONTAMINATION
(SURFACE WATER CONTAMINATION
IGROUNDWATER CONTAMINATION
| SOIL CONTAMINATION
1
PRODUCTION FACILITY [DIRECT CONTACT
[DRINKING WATER CONTAMINATION
[AIR CONTAMINATION
[SURFACE WATER CONTAMINATION
(SOIL CONTAMINATION
1
1
1
WASTE MANAGEMENT FACILITY [DIRECT CONTACT
|AIR CONTAMINATION
1
1
1
| MITIGATIVE ACTIONS
1
[DISPOSAL
[PUMPED OUT CONTAMINANTS
[EXCAVATION
1
1
1
[DISPOSAL
(REPACKED DRUMS
(NEUTRALIZED MATERIALS
(BULKED MATERIALS
(MIGRATION CONTROL
[EXCAVATION
[SAMPLING, ANALYSIS
1
[EXCAVATION
[SECURITY
[RESTORATION
[SAMPLING, ANALYSIS
1
| COST |
($(000) |
|$ 9|
1
1
1
1
1
|$ 24 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
|$ 430 |
1 1
1 1
1 1
1 1
* NOTE: NON-NPL SITE AT INITIATION OF REMOVAL. HOWEVER, CURRENTLY ON PROPOSED OR FINAL NPL.
-------
SUPERFUND EMERGENCY RESPONSE ACTIONS
HISTORICAL
|RG|ST| NAME ' | LOCATION |NPL|
III 1 II
|05|OH|VALLEYUOOD SUBDIVISION |VALLEYWOOD
III 1
III 1
|05|OH|W.58TH STREET DRUM SITE [CLEVELAND
III 1
III 1
|05|OH|WADE PARK CHEMICALS (ABANDONED CHEM| CLEVELAND
III 1
III 1
III 1
III 1
Ml 1
M 1 1
|05|wi|c-UAY ISPENCER
Ml 1
III 1
III 1
N | OTHER
1
1
N (MIDNIGHT
1
1
N [INACTIVE
1 .
1
1
1
1
1
N (INACTIVE
1
1
1
INCIDENT | THREATS
CATEGORY |
[DRINKING WATER CONTAMINATION
[GROUNDWATER CONTAMINATION
1
DUMP [DIRECT CONTACT
[FIRE/EXPLOSION
1
PRODUCTION FACILITY [DIRECT CONTACT
[FIRE/EXPLOSION
[AIR CONTAMINATION
1
1
1
1
WASTE MANAGEMENT FACILITY|DIRECT CONTACT
[FIRE/EXPLOSION
1
1
| MITIGATIVE ACTIONS | COST |
| [$(000) |
[WATER SUPPLIED |$
1 1
1 1
[DISPOSAL |$
ISAMPLING, ANALYSIS |
1 1
[DISPOSAL |$
[REPACKED DRUMS |
[NEUTRALIZED MATERIALS |
[CONTAMINANT CONTAINMENT/RETENTION]
[RESTORATION |
[SAMPLING, ANALYSIS |
1 1
[DISPOSAL |$
[SOLIDIFIED MATERIALS |
| CONTAMINANT CONTAINMENT/RETENTION |
1 1
57|
1
1
1|
I
I
46 1
I
I
I
I
I
I
22 1
I
I
I
-------
SUPERFUND EMERGENCY RESPONSE ACTIONS
HISTORICAL
|RG|ST| NAME
1 1 1
|05|UI|OAK CREEK
1 1 1
III
1 1 1
| LOCATION
1
(OAK CREEK
1
1
1
NPL| INCIDENT | THREATS | MITIGATIVE ACTIONS | COST |
| CATEGORY | 1 l$(000>l
N (INACTIVE PRODUCTION FACILITY [DIRECT CONTACT |SAMPLING,ANALYSIS |$ 1|
| [DRINKING WATER CONTAMINATION | | I
| (SURFACE WATER CONTAMINATION | I I
I I I II
05
1 05
WI
WI
RODGERS LABORATORIES
SCHMALZ DUMP
MILWAUKEE
HARRISON
N
Y
INACTIVE WASTE MANAGEMENT FACILITY (DIRECT CONTACT (DISPOSAL
(FIRE/EXPLOSION (REPACKED DRUMS
(AIR CONTAMINATION (ORGANIZED MATERIALS
(SOIL CONTAMINATION (MIGRATION CONTROL
| (RELOCATION/EVACUATION
| (SECURITY
| | SAMPLING, ANALYSIS
I I
INACTIVE WASTE MANAGEMENT FACILITY|DIRECT CONTACT (SECURITY
(DRINKING WATER CONTAMINATION (SAMPLING, ANALYSIS
IGROUNDWATER CONTAMINATION |
(SURFACE WATER CONTAMINATION |
(SOIL CONTAMINATION |
I I
$ 397 1
I
I
I
I
I
I
I
$ 11|
I
I
I
I
I
-------
SUPERFUND EMERGENCY RESPONSE ACTIONS
HISTORICAL
|RG|ST| NAME
LOCATION |NPL|
I I
INCIDENT
CATEGORY
THREATS
MITIGATIVE ACTIONS
| COST |
[$(000) |
|05|WI|SPECTRO CHEMICAL
| OREGON
N | ACTIVE PRODUCTION FACILITY
[DIRECT CONTACT
[FIRE/EXPLOSION
[DISPOSAL |$ 821
[CONTAMINANT CONTAINMENT/RETENTION| |
[MIGRATION CONTROL | |
[SECURITY | |
[SAMPLING,ANALYSIS | |
I I I
|05|WI|WAUSAU GROUNDWATER CONTAMINATION [WAUSAU
III |
I I I |
I I I I
N*| OTHER
[DIRECT CONTACT [DISPOSAL
[DRINKING WATER CONTAMINATION [SAMPLING,ANALYSIS
|GROUNDWATER CONTAMINATION |
I I
|$ 215|
I I
NOTE: NON-NPL SITE AT INITIATION OF REMOVAL. HOWEVER, CURRENTLY ON PROPOSED OR FINAL NPL.
-------
U. S. EPA REGION 6
For Information Contact:
Chief, Emergency Response
Branch, Environmental
Services Division
1445 Ross Avenue
Dallas, TX 75202-273
(214) 655-2270
-------
SUPERFUND EMERGENCY RESPONSE ACTIONS
HISTORICAL
|RG|ST| NAME | LOCATION
Ml I
| 06 | LA | BARGE STAR 7-CG (LAROSE
IM 1
III |
Ml 1
[NPL| INCIDENT
| CATEGORY
N | TRANSPORTATION-RELATED
1
1
1
| THREATS
1
IDRINKING WATER CONTAMINATION
|AIR CONTAMINATION
(SURFACE WATER CONTAMINATION
1
| MITIGATIVE ACTIONS
1
(DISPOSAL
(PUMPED OUT CONTAMINANTS
|SAMPLING,ANALYSIS
1
| COST |
|$(000)|
|$ 174|
1 1
1 1
1 1
|06|LA|CLEVE REBER [SORRENTO
|06|LA|OLD INGER OIL REFINERY |DARROW
1
1
1
1
Y (INACTIVE WASTE MANAGEMENT FACILITY|DIRECT CONTACT (DISPOSAL |$ 2|
(DRINKING WATER CONTAMINATION (ORGANIZED MATERIALS
(FOOD CHAIN CONTAMINATION (CAPPED
(AIR CONTAMINATION (BULKED MATERIALS
(SURFACE WATER CONTAMINATION (EXCAVATION
| (RESTORATION
I |SAMPLING,ANALYSIS
I I
I
I
I
I
I
I
I
Y (INACTIVE PRODUCTION FACILITY (DIRECT CONTACT (DISPOSAL |$ 135 1
| (SURFACE WATER CONTAMINATION (CONTAMINANT CONTAINMENT/RETENTION | |
| (SOIL CONTAMINATION (MIGRATION CONTROL | |
| (GROUNDWATER CONTAMINATION (EXCAVATION | |
I (SECURITY
I |SAMPLING,ANALYSIS
I I
I
I
I
-------
SUPERFUND EMERGENCY RESPONSE ACTIONS
HISTORICAL
|RG|ST| NAME
1 1 1
| 06 | LA | STONEWALL DRUG DUMP
1 1 1
1 1 1
|06|LA|W.J. OIL CO
1 1 1
1 1 1
1 ! 1
III
1 1 1
| 06 |NM| ARGENT CORPORATION
1 1 1
1 1 1
1 1 I
|06|NM|PRONTO SERVICES
1 1 1
1 1 1
1 1 1
1 1 1
1 1 1
1 1 1
1 i 1
| LOCATION
I
(STONEWALL
1
1
|L AROSE
1
1
1
I
1
|RIO RANCHO
1
1
1
(ALBUQUERQUE
1
1
1
1
1
1
1
NPL| INCIDENT | . THREATS
| CATEGORY |
N (MIDNIGHT DUMP (FIRE/EXPLOSION
i i
1 1
N (INACTIVE PRODUCTION FACILITY (DIRECT CONTACT
| (FIRE/EXPLOSION
| (SURFACE WATER CONTAMINATION
| (SOIL CONTAMINATION
1 1
1 1
N (ACTIVE PRODUCTION FACILITY (DIRECT CONTACT
| (SURFACE WATER CONTAMINATION
| (SOIL CONTAMINATION
1 1
N (INACTIVE WASTE MANAGEMENT FACILITY (DIRECT CONTACT
| (AIR CONTAMINATION
| (GROUNDWATER CONTAMINATION
| (SOIL CONTAMINATION
I 1
1 1
1 1
1 1
| MITIGATIVE ACTIONS
1
(DISPOSAL
(NEUTRALIZED MATERIALS
1
(DISPOSAL
(ORGANIZED MATERIALS
(EXCAVATION
(SECURITY
(SAMPLING, ANALYSIS
1
(DISPOSAL
(EXCAVATION
(RESTORATION
1
(DISPOSAL
(CAPPED
(SOLIDIFIED MATERIALS
(MIGRATION CONTROL
(EXCAVATION
(RESTORATION
|SAMPLING,ANALYSIS
1
COST |
K000)|
$ 7|
1
1
$ 55 1
1
1
1
1
1
$ 29 1
1
1 1
1 1
|$ 21 1
1
1
1
1
1
1
1
-------
SUPERFUND EMERGENCY RESPONSE ACTIONS
HISTORICAL
|RG|ST| NAME | LOCATION |NPL| INCIDENT
1 1 1
|06|NM|S VALLEY PCB TANK SITE [ALBUQUERQUE
1 1
1 1
1 1
1 1
1
1
|06|OK|DUNCAN TRANSFORMER SITE [DUNCAN
1
1
1
1
1
1
1
| 06 | OK [HADDOCK AIRPORT [ERRICK
1 1
1 1
1 1
1 1
1 i
CATEGORY
N [MIDNIGHT DUMP
1
1
1
!
N [INACTIVE WASTE MANAGEMENT
N (MIDNIGHT DUMP
1
1
1
| THREATS
1
[DIRECT CONTACT
[FOOD CHAIN CONTAMINATION
[SURFACE WATER CONTAMINATION
[SOIL CONTAMINATION
1
1
1
FACILITY[DIRECT CONTACT
|SOIL CONTAMINATION
[SURFACE WATER CONTAMINATION
1
I
1
I
1
[DIRECT CONTACT
[AIR CONTAMINATION
[SOIL CONTAMINATION
1
1
1
| MITIGATIVE ACTIONS
1
[DISPOSAL
[SOLIDIFIED MATERIALS
| COST |
[$(000) |
|$ 75[
1 1
[CONTAMINANT CONTAINMENT/RETENTION | |
[EXCAVATION
[RESTORATION
- [SAMPLING, ANALYSIS
1
[DISPOSAL
[REPACKED DRUMS
[CAPPED
[ORGANIZED MATERIALS
[EXCAVATION
[RESTORATION
|SAMPLING,ANALYSIS
1
[DISPOSAL
[EXCAVATION
[SECURITY
[RESTORATION
[SAMPLING, ANALYSIS
1
1 1
1 1
1 1
1 1
|$ 218|
I I
I I
I I
I I
I I
I I
I I
|$ 14|
I I
I I
I I
I I
I I
-------
SUPERFUND EMERGENCY RESPONSE ACTIONS
HISTORICAL
|RG|ST| NAME | LOCATION
III 1
|06|OK|JACK DENNIS PESTICIDE BURNSITE |MIDUEST CITY
III 1
III 1
III 1
III 1
III 1
III - 1
III 1
|06|OK|TAR CREEK (OTTAWA COUNTY) (OTTAWA COUNTY
III 1
III 1
III 1
|06|OK|WHEATLAND DRUM (OKLAHOMA CITY
III 1
III 1
III 1
III 1
III 1
NPL| INCIDENT
| CATEGORY
N | INACTIVE WASTE MANAGEMENT
1
1
1
1
1
1
1
Y (OTHER
1
1
: i
N (INACTIVE WASTE MANAGEMENT
1
1
1
1
1
| THREATS
1
FACILITY (DIRECT CONTACT
(DRINKING WATER CONTAMINATION
(GROUNDWATER CONTAMINATION
(SOIL CONTAMINATION
1
1
1
1
(DRINKING WATER CONTAMINATION
| GROUNDWATER CONTAMINATION
(SURFACE WATER CONTAMINATION
1
FACILITY (DIRECT CONTACT
(SOIL CONTAMINATION
1
1
1 :
1
| MITIGATIVE ACTIONS | COST |
| |$C 000)|
(DISPOSAL |$ 32 |
(MIGRATION CONTROL |
(EXCAVATION |
(RELOCATION/EVACUATION |
(SECURITY |
(RESTORATION |
(SAMPLING .ANALYSIS |
1 1
(CONTAMINANT CONTAINMENT/RETENTION |$ 332 1
(MIGRATION CONTROL | |
(WATER SUPPLIED | |
1 II
(DISPOSAL |$ 284 |
(ORGANIZED MATERIALS |
(BULKED MATERIALS | |
(EXCAVATION | |
(SAMPLING .ANALYSIS | |
1 1 1
-------
SUPERFUND EMERGENCY RESPONSE ACTIONS
HISTORICAL
|RG|ST| NAME | LOCATION
III 1
|06|TX|301 MAIN STREET [SOUTH HOUSTON
III I
III I
I I I I
III I
III I
III I
I I I I
NPL| INCIDENT | THREATS
| CATEGORY |
N [INACTIVE PRODUCTION FACILITY [DIRECT CONTACT
| [FIRE/EXPLOSION
| [AIR CONTAMINATION
| [SOIL CONTAMINATION
I I
I I
I I
I I
| MITIGATIVE ACTIONS | COST |
| |$(000)|
[DISPOSAL |$ 273 |
[REPACKED DRUMS j |
[ORGANIZED MATERIALS | |
[EXCAVATION | |
[SECURITY | |
[RESTORATION | |
[SAMPLING, ANALYSIS | |
I I I
|06|TX|ACRYLONITRIL SPILL-CG
|TEXAS CITY
N [TRANSPORTATION-RELATED
[SURFACE WATER CONTAMINATION
I
[DISPOSAL |$
|CONTAMINANT CONTAINMENT/RETENTION|
[SAMPLING,ANALYSIS |
2|
|06|TX|AGGIE CHEMICAL [SAN ANTONIO
I I I
I I I
I I I
I I I
I I I
N [INACTIVE WASTE MANAGEMENT FACILITY [DIRECT CONTACT
I [FIRE/EXPLOSION
I I
I I
' I I
I I
[DISPOSAL |$ 48 |
[REPACKED DRUMS | |
[CONTAMINANT CONTAINMENT/RETENTION) |
[SECURITY | |
[SAMPLING, ANALYSIS | |
I I I
-------
SUPERFUND EMERGENCY RESPONSE ACTIONS
HISTORICAL
|RG|ST| NAME | LOCATION
III 1
| 06 |TX| AMOCO DOCK 31 -CG (GALVESTON
III I
III I
III I
|06|TX [BARKER CHEMICAL [GRANDVIEW
III I
III I
III I
III I
III I
I I I I
|06|TX|BIO-ECOLOGY SYSTEMS, INC. (GRAND PRAIRIE
III I
III I
| 06 | TX | CARGO SHIP EXPLOSION-CG [HOUSTON
III I
III I
III I
NPL| INCIDENT | THREATS
| CATEGORY |
N [MIDNIGHT DUMP [DIRECT CONTACT
| [SURFACE WATER CONTAMINATION
| [ECOLOGICAL DAMAGE
I I
N [INACTIVE PRODUCTION FACILITY [DIRECT CONTACT
| [FIRE/EXPLOSION
| [SURFACE WATER CONTAMINATION
| [GROUNDWATER CONTAMINATION
I I
I I
I I
Y [INACTIVE WASTE MANAGEMENT FACILITY |DIRECT CONTACT
| | GROUNDWATER CONTAMINATION
I I
N [TRANSPORTATION-RELATED [FIRE/EXPLOSION
| [AIR CONTAMINATION
I I
I I
| MITIGATIVE ACTIONS | COST |
| |$COOO)|
.[DISPOSAL |$ 4 1
| SAMPLING .ANALYSIS | |
I I I
I I I
[DISPOSAL |$ 835 |
[ORGANIZED MATERIALS ' | |
[SOLIDIFIED MATERIALS | |
[CONTAMINANT CONTAINMENT/RETENTION | |
[EXCAVATION | |
[SAMPLING, ANALYSIS | |
I I I
(DISPOSAL |$ 3 |
(SECURITY | |
I I I
[DISPOSAL |$ 311 |
[NEUTRALIZED MATERIALS | |
[REPACKED DRUMS | |
I I I
-------
SUPERFUND EMERGENCY RESPONSE ACTIONS
HISTORICAL
|RG|ST| NAME
I I I
LOCATION |NPL|
INCIDENT
CATEGORY
THREATS
HITIGATIVE ACTIONS
| COST |
[$(000)|
|06|TX|CHEMICAL DRUMS-PADRE ISLAND-CG
I I I
I I I
I I I
[BROWNSVILLE
N [MIDNIGHT DUMP
(DIRECT CONTACT
(SOIL CONTAMINATION
[DISPOSAL
[REPACKED DRUMS
[SAMPLING,ANALYSIS
|$ 5|
I I
| 06 |TX| CRYSTAL CHEMICAL CO (HOUSTON
III 1
1 1 1
II 1
1 1 1
1 1 1
1 1 1
| 06 |TX| CRYSTAL CITY AIRPORT [CRYSTAL CITY
Ml 1
Ml I
Ml I
Ml I
Ml I
M 1 |
M 1 |
Ml I
Y [INACTIVE PRODUCTION FACILITY (DIRECT CONTACT
(SOIL CONTAMINATION
(SURFACE WATER CONTAMINATION
1
1
1
1
N* (MIDNIGHT DUMP (SOIL CONTAMINATION
1 1
1
1
1
1
1
1
1
[DISPOSAL
(CAPPED
(MIGRATION CONTROL
(EXCAVATION
(SECURITY
(RESTORATION
1
(DISPOSAL
(ORGANIZED MATERIALS
(CAPPED
(SOLIDIFIED MATERIALS
|$ 809 1
1 1
1 1
1 1
1 1
1 1
1 1
|$ 58|
1 1
1 1
1 1
(CONTAMINANT CONTAINMENT/RETENTION | |
(MIGRATION CONTROL
(SECURITY
(SAMPLING, ANALYSIS
1
1 1
1 1
1 1
1 1
NOTE: NON-NPL SITE AT INITIATION OF REMOVAL. HOUEVER, CURRENTLY ON PROPOSED OR FINAL NPL.
-------
SUPERFUND EMERGENCY RESPONSE ACTIONS
HISTORICAL
|RG|ST| NAME
1 1 1
| LOCATION |NPL|
1 1 1
INCIDENT
CATEGORY
| THREATS | MITIGATIVE ACTIONS | COST |
1 | |$COOO)|
|06|TX|FRENCH, LTD.
|CROSBY
|INACTIVE WASTE MANAGEMENT FACILITY|AIR CONTAMINATION
| |SURFACE WATER CONTAMINATION
| IGROUNDWATER CONTAMINATION
| [SOIL CONTAMINATION
I I
I I
[DISPOSAL |$ 617|
IPUMPED OUT CONTAMINANTS | |
|CAPPED | |
[CONTAMINANT CONTAINMENT/RETENTION] |
[MIGRATION CONTROL . II
[SECURITY | |
|SAMPLING,ANALYSIS | |
I II
|06|TX|GENEVA IND/FURHMANN ENERGY CORP. [HOUSTON
Y [INACTIVE PRODUCTION FACILITY
[DIRECT CONTACT
[FIRE/EXPLOSION
[DRINKING WATER CONTAMINATION
[AIR CONTAMINATION
[SURFACE WATER CONTAMINATION
IGROUNDWATER CONTAMINATION
[SOIL CONTAMINATION
[DISPOSAL
[PUMPED OUT CONTAMINANTS
[SOLIDIFIED MATERIALS
[MIGRATION CONTROL
[SECURITY
[RESTORATION
[SAMPLING,ANALYSIS
I
|$ 1983|
I I
|06|TX|HIGHLANDS ACID PIT
{HIGHLANDS
Y [INACTIVE WASTE MANAGEMENT FACILITY[DIRECT CONTACT
| [DRINKING WATER CONTAMINATION
| [SURFACE WATER CONTAMINATION
| IGROUNDWATER CONTAMINATION
[SECURITY
-------
SUPERFUND EMERGENCY RESPONSE ACTIONS
HISTORICAL
|RG|ST| NAME | LOCATION |NPL| INCIDENT | THREATS
III 1
| 06 |TX| HOUSTON SHIP CHANNEL-CG [HOUSTON
III 1
III 1
|06|TX|HATAGORDA ISLAND-CG |GULF COAST
III 1
III 1
III 1
III 1
| CATEGORY |
N IHIDNIGHT DUMP [SURFACE WATER CONTAMINATION
1 1
1 1
N [MIDNIGHT DUMP [DIRECT CONTACT
| [SURFACE WATER CONTAMINATION
| [SOIL CONTAMINATION
1 1
1 1
| MITIGATIVE ACTIONS
1
[DISPOSAL
[SAMPLING.ANALYSIS
1
[DISPOSAL
[ORGANIZED MATERIALS
[SECURITY
[SAMPLING, ANALYSIS
1
| COST |
|$(000)|
|$
1
1
|$
1
1
1
1
5|
1
1
45 1
1
1
1
I
|06|TX|MIDNIGHT DUMP-CG [PORT ARTHUR
III 1
III 1
III 1
III 1
III 1
III 1
|06|TX|MOTCO, INC. [LA MARQUE
III 1
III 1
III 1
III 1
III 1
N [MIDNIGHT DUMP [DIRECT CONTACT
Y
[SOIL CONTAMINATION
1
1
1
1
1
INACTIVE WASTE MANAGEMENT FACILITY [DIRECT CONTACT
[FOOD CHAIN CONTAMINATION
[SURFACE WATER CONTAMINATION
[ECOLOGICAL DAMAGE
1
1
(DISPOSAL |$ 243 |
[CONTAMINANT CONTAINMENT/RETENTION | |
[NEUTRALIZED MATERIALS
[MIGRATION CONTROL
[RESTORATION
|SAMPLING,ANALYSIS
1
I
I
I
I
I
[DISPOSAL |$ 126
[PUMPED OUT CONTAMINANTS
[MIGRATION CONTROL
[SECURITY
[SAMPLING, ANALYSIS
I
-------
SUPERFUND EMERGENCY RESPONSE ACTIONS
HISTORICAL
|RG|ST| NAME
1 1 1
| LOCATION |NPL|
1 1 1
INCIDENT | THREATS
CATEGORY |
| MITIGATIVE ACTIONS | COST |
1 |$(000)|
|06|TX|NEAR WILLS POINT
I I I
I I I
I I I
I I I
|VAN ZANDT CO. I N [MIDNIGHT DUMP
I I I
I I I
I I I
I I I
(SOIL CONTAMINATION
I
(DISPOSAL
[REPACKED DRUMS
(EXCAVATION
(SAMPLING,ANALYSIS
|06|TX|PADRE & MUSTANG ISLANDS I-CG (GULF COAST | N (MIDNIGHT DUMP (DIRECT CONTACT (DISPOSAL |$ 203
II 1 II (SOIL CONTAMINATION (REPACKED DRUMS |
Ml 1 1
Ml | |
1 1
I (ORGANIZED MATERIALS
I (SAMPLING, ANALYSIS
III I |
| 06|TX| PADRE & MUSTANG ISLANDS I I-CG (GULF COAST | N (MIDNIGHT DUMP (DIRECT CONTACT (DISPOSAL |$ 120
I
I
I
I
I
(SOIL CONTAMINATION (ORGANIZED MATERIALS
(SURFACE WATER CONTAMINATION (REPACKED DRUMS
I (SECURITY
I | SAMPLING, ANALYSIS
I I
-------
SUPERFUND EMERGENCY RESPONSE ACTIONS
HISTORICAL
|RG|ST| NAME | LOCATION |NPL| INCIDENT | THREATS
Ml | || CATEGORY |
|06|TX|PADRE & MUSTANG ISLANDS III-CG |GULF COAST
III 1
III 1
II 1 1
III 1
N (MIDNIGHT DUMP (DIRECT CONTACT
| (SOIL CONTAMINATION
| (SURFACE WATER CONTAMINATION
1 1
1 1
| MITIGATIVE ACTIONS
1
(DISPOSAL
(ORGANIZED MATERIALS
(SECURITY
(SAMPLING, ANALYSIS
1
| COST |
($(000) |
|$
1
1
1
1
99|
1
1
1
1
| 06 |TX| PADRE ISLAND IV (LEGUNA MADRE)-CG
1 1
1 1
1 1
1 1
1 1
IGULF COAST
1
1
1
1
I
N (MIDNIGHT DUMP
1
1
1
1
1
(DIRECT CONTACT
(SOIL CONTAMINATION
(SURFACE WATER CONTAMINATION
1
1
1
(DISPOSAL
(REPACKED DRUMS
| ORGAN I ZED MATERIALS
[SECURITY
|SAMPLING,ANALYSIS
1
|$ 75|
1 1
1 1
1 1
1 1
1 1
| 06 |TX| PANTHER CREEK- CG
1 1 1
1 1 1
1 1 1
|06|TX|PESSES CHEMICAL
1 1 1
1 1 1
1 1 1
1 1 1
1 1 1
1 1 1
(GALLENO PARK
1
1
1
(FORT WORTH
1
1
1
1
1
1
N (TRANSPORTATION-RELATED
1
1
1
N*| INACTIVE PRODUCTION FACILITY
1
1
1
1
1
1
[SURFACE WATER CONTAMINATION
| ECOLOGICAL DAMAGE
1
1
(FIRE/EXPLOSION
|AIR CONTAMINATION
ISURFACE WATER CONTAMINATION
|SOIL CONTAMINATION
1
1
1
[DISPOSAL
|$
[CONTAMINANT CONTAINMENT/RETENTION |
(MIGRATION CONTROL
1
| DISPOSAL
[BULKED MATERIALS
(EXCAVATION
[SECURITY
[RESTORATION
[SAMPLING, ANALYSIS
1
1
1
|$
1
1
1
1
1
1
3|
1
1
1
315J
MOTE: NOM-HPL SITE AT INITIATION OF REMOVAL. HOWEVER, CURRENTLY OH PROPOSED OP. FINAL NPL.
-------
SUPERFUND EMERGENCY RESPONSE ACTIONS
HISTORICAL
|RG|ST| NAME | LOCATION
III i
III |
|06(TX|PETRO-CHEMICAL SYSTEMS (LIBERTY COUNTY
III i
III |
1 1 1
|06|TX|SHIP CHANNEL-CG (HOUSTON
ill i
III |
III i
III 1
|06|TX|SIKES DISPOSAL PITS (CROSBY
ill i
III |
ill i
III |
1 1 1
| 06 |TX| SOUTH ACRES (SOUTH HOUSTON
III i
III |
III i
III |
III 1
III . |
II |
|NPL| INCIDENT | THREATS
| | CATEGORY |
Y (INACTIVE WASTE MANAGEMENT FACILITY (DIRECT CONTACT
1 ' 1
1 1
N (MIDNIGHT DUMP (SURFACE WATER CONTAMINATION
1 1
1 1
Y (INACTIVE WASTE MANAGEMENT FACILITY (SURFACE WATER CONTAMINATION
1 (SOIL CONTAMINATION
1 1
1 1
N (INACTIVE PRODUCTION FACILITY (DIRECT CONTACT
1 (SOIL CONTAMINATION
1 (SURFACE WATER CONTAMINATION
1 1
1 1
| MITIGATIVE ACTIONS
1
| SECURITY
(SAMPLING.ANALYSIS
1
[DISPOSAL
[SAMPLING, ANALYSIS
1
(DISPOSAL
(EXCAVATION
(RESTORATION
1
(DISPOSAL
(REPACKED DRUMS
(EXCAVATION
(SECURITY
1
| COST |
|$(QOO)|
|$ 18|
| |
I I
I* 2|
I I
I I
|$ 36|
I I
I |
I I
|$ 268 |
I I
I I
' I I
-------
SUPERFUND EMERGENCY RESPONSE ACTIONS
HISTORICAL
RG|
ST|
NAME | LOCATION |NPL| INCIDENT | THREATS | MITIGATIVE ACTIONS | COST
[ | | CATEGORY | 1 l$(000)l
06|TX|SOUTH OF WACO (MCCLENNAN CO.
1 1 1
1
1
|06|TX|STEWCO, INC
|06|TX
1 1
UASKOM
STYRENE SPILL-CG (TEXAS CITY
1
N (MIDNIGHT DUMP (SURFACE WATER CONTAMINATION (DISPOSAL |
| (SOIL CONTAMINATION (EXCAVATION
1 1 (SAMPLING.ANALYSIS
1 1
N*|INACTIVE WASTE MANAGEMENT FACILITY|DIRECT CONTACT (DISPOSAL
(DRINKING WATER CONTAMINATION (SOLIDIFIED MATERIALS
(GROUNDWATER CONTAMINATION (PUMPED OUT CONTAMINANTS
(SURFACE WATER CONTAMINATION (CAPPED
(MIGRATION CONTROL
(EXCAVATION
(RESTORATION
(SAMPLING, ANALYSIS
1 1
$ 4|
1
1
$ 530 1
N (TRANSPORTATION-RELATED (SURFACE WATER CONTAMINATION (DISPOSAL |* 7
(SAMPLING, ANALYSIS |
1 i
1 ! 1
NOTE: NON-NPL SITE AT INITIATION OF REMOVAL. HOWEVER, CURRENTLY ON PROPOSED OR FINAL NPL.
-------
SUPERFUND EMERGENCY RESPONSE ACTIONS
HISTORICAL
|RG|ST| NAME
1 1
LOCATION |NPL| INCIDENT | THREATS
1
|06|TX|TRIANGLE CHEMICAL CO. (BRIDGE CITY
1 1
1 1
Ii
1
1 1
1 1
Ii
1
II
1
1 1
|06|TX|W1NKLER ROAD |PEARLAND
III
1 1 1
1 1 1
III
1 1 1
I!
1
It
1
Ii
1
CATEGORY |
Y (INACTIVE PRODUCTION FACILITY (DIRECT CONTACT
(AIR CONTAMINATION
N (INACTIVE PRODUCTION FACILITY (DIRECT CONTACT
(FIRE/EXPLOSION
1
1
I
I
1
1
| MITIGATIVE ACTIONS | COST |
1 |$(000)|
(.DISPOSAL
(ORGANIZED MATERIALS
(SOLIDIFIED MATERIALS
(BULKED MATERIALS
| CONTAM I NANT CONTA I NMENT/RETENT I ON
(MIGRATION CONTROL
(EXCAVATION
(SECURITY
1
$ 91|
I
I
I
I
I
I
I
I
(DISPOSAL |$ 151 |
(ORGANIZED MATERIALS | |
(SOLIDIFIED MATERIALS | |
(BULKED MATERIALS | |
(CONTAMINANT CONTAINMENT/RETENTION | |
(EXCAVATION | |
(SECURITY | |
| SAMPLING, ANALYSIS | |
I I I
-------
-------
U.S. EPA REGION?
For Information Contact:
Chief, Emergency Planning
and Response Branch,
Environmental Services Division
25 Funston Road
Kansas City, KS 66115
(913) 236-3888
-------
SUPERFUND EMERGENCY RESPONSE ACTIONS
HISTORICAL
|RG|ST| NAME
I I 1
| LOCATION |NPL|
1 1 1
INCIDENT
CATEGORY
| THREATS | HITIGATIVE ACTIONS | COST |
| | [$(000) |
|07|IA|AIDEX CORP.
[COUNCIL BLUFFS
Y [INACTIVE PRODUCTION FACILITY
I
[DIRECT CONTACT
[SOIL CONTAMINATION
[ORGANIZED MATERIALS
(STORAGE
I
29|
07|IA|CURTIS ANIMAL PRODUCTS
CORNING
|07|KS|JOHN'S REFINERY JWICHITA
I
1 1 1
! 1 1
1
N
ACTIVE PRODUCTION FACILITY [DIRECT CONTACT (DISPOSAL |$ 192|
(DRINKING WATER CONTAMINATION [CONTAMINANT CONTAINMENT/RETENTION]
[AIR CONTAMINATION (MIGRATION CONTROL
[SOIL CONTAMINATION (EXCAVATION
(ECOLOGICAL DAMAGE [SECURITY
| (RESTORATION
| [SAMPLING, ANALYSIS
I I
N [INACTIVE PRODUCTION FACILITY (DIRECT CONTACT [DISPOSAL |$ 750|
[FIRE/EXPLOSION [CAPPED
| (EXCAVATION
( [SECURITY |
| [RESTORATION |
| [SAMPLING, ANALYSIS |
I I
-------
SUPERFUND EMERGENCY RESPONSE ACTIONS
HISTORICAL
|RG|ST| NAME | LOCATION |NPL| INCIDENT
1 1
| | | CATEGORY
|07|KS [RICHMOND STREET DRUM [KANSAS CITY
1 1
1
| 07 | MO | BL I SS/FRONTENAC | FRONTENAC
1 1
1 1
1 1
1 1
1 1
1
1
1
1
1
|07|MO|BLUE RIVER FLOOD [KANSAS CITY
1 1
1 1
1 1
1 1
1
1
1
1
|07|MO|CASHEL PROPERTY [JEFFERSON CO.
1 1
1 I
1 1
1
1
1
N [OTHER
1
N [INACTIVE WASTE MANAGEMENT
1
1
1
1
1
N (OTHER
1
1
1
1
N [OTHER
1
1
1
| THREATS
1
[FIRE/EXPLOSION
1
FACILITY|DIRECT CONTACT
[SOIL CONTAMINATION
1
1
1
1
(DIRECT CONTACT
IFIRE/EXPLOSION
[SURFACE WATER CONTAMINATION
1
1
[DIRECT CONTACT
(SOIL CONTAMINATION
1
1
| MITIGATIVE ACTIONS
1
(DISPOSAL
1
[DISPOSAL
| COST |
|$<000)|
|$ 1|
I I
|$ 60 1
(CONTAMINANT CONTAINMENT/RETENTION] |
(MIGRATION CONTROL
(RESTORATION
| SAMPLING, ANALYSIS
1
(DISPOSAL
(REPACKED DRUMS
[ORGANIZED MATERIALS
[SAMPLING, ANALYSIS
1
[EXCAVATION
(RESTORATION
(STORAGE
1
I I
I I
I I
I I
I* 35 1
I |
I I
I I
I I
|$ 890 |
I I
I I
I I
-------
SUPERFUND EMERGENCY RESPONSE ACTIONS
HISTORICAL
|RG|ST| NAME
1 1 1
| LOCATION |NPL|
1 1 1
INCIDENT | THREATS
CATEGORY |
| MITIGATIVE ACTIONS | COST |
| |$(000)|
|07|MO| COMMUNITY CHRISTIAN CHURCH (MANCHESTER | N (MIDNIGHT DUMP (DIRECT CONTACT
III 1 1
1 1 1
1
1
1 1 1
1
|07|MO|ELLISVILLE SITE (CALLAHAN) (ELLISVILLE
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
|07|HO|ERUIN FARM (VERONA
III 1
1
1 1
Y
(SOIL CONTAMINATION
1
1
1
INACTIVE WASTE MANAGEMENT FACILITY|DIRECT CONTACT
(AIR CONTAMINATION
(DRINKING WATER CONTAMINATION
(GROUNDWATER CONTAMINATION
(SURFACE WATER CONTAMINATION
(SOIL CONTAMINATION
1
1
1
N (OTHER (SOIL CONTAMINATION
1 1
1 1
(CAPPED |$ 80 |
(MIGRATION CONTROL
(RESTORATION
(SAMPLING, ANALYSIS
1
1
1
1
(DISPOSAL |$ 259 |
(REPACKED DRUMS |
(CONTAMINANT CONTAINMENT/RETENTION]
(ORGANIZED MATERIALS
(MIGRATION CONTROL
(EXCAVATION
(SECURITY
(SAMPLING, ANALYSIS
1
(DISPOSAL |* 300
(EXCAVATION |
1
1
-------
SUPERFUND EMERGENCY RESPONSE ACTIONS
HISTORICAL
|RG|ST| NAME
1 1 1
|07|MO| FLOOD DAMAGE
1 1 1
1 1 1
Ml
|07|«0|FRANKLIN/G1MBLIN ST
1 1 1
1 1 1
III
1 1 1
|07|MO|HOLLY STREET DRUM SITE
1 1 1
1 1 1
|07|MO|LACY MANOR DRIVE
1 1 1
1 1 1
1 1 1
1 1 1
1 1 1
1 1 1
| LOCATION |NPL| INCIDENT
I | | CATEGORY
|ST. LOUIS
1
1
1
|ST. LOUIS
1
1
1
|
(KANSAS CITY
1
1
(JEFFERSON CO.
1
1
1
1 N
1
1
N (OTHER
1
1
1
N (MIDNIGHT DUMP
1
1
1
1
N (MIDNIGHT DUMP
1
1
N (MIDNIGHT DUMP
| THREATS
1
(DIRECT CONTACT
[SURFACE WATER CONTAMINATION
(ECOLOGICAL DAMAGE
1
(DIRECT CONTACT
(SURFACE WATER CONTAMINATION
1
1
1
(DIRECT CONTACT
(SOIL CONTAMINATION
1
(DIRECT CONTACT
(SOIL CONTAMINATION
| MITIGATIVE ACTIONS
1
(DISPOSAL
(ORGANIZED MATERIALS
I
1
(DISPOSAL
(REPACKED DRUMS
(SECURITY
I SAMPLING, ANALYSIS
1
(DISPOSAL
(SAMPLING, ANALYSIS
I
(DISPOSAL
(REPACKED DRUMS
(ORGANIZED MATERIALS
| RELOCAT I ON/E VACUAT I ON
(RESTORATION
[SAMPLING, ANALYSIS
1
| COST |
($(000) |
1*
1
1
1
1*
1
1
1
1
|$
1
1
|$
1
1
1
1
1
1
31 1
1
1
1
27(
1
1
1
1
29 1
1
1
42 1
I
1
1
1
1
1
-------
SUPERFUND EMERGENCY RESPONSE ACTIONS
HISTORICAL
|RG|ST| NAME
1 1 1
|07|MO|MEXICO FEED & SEED
1 1 1
I 1 1
1 1 1
1 1 1
|07|MO|NEOSHO WASTEUATER TREATMENT SCHOOL
1 I 1
1 1 1
|07|MO|NORTH-U DRIVE WELL CONTAMINATION
1 1 1
1 1 1
1 1 1
|07|MO|ROCKWOOO SCHOOL DISTRICT
1 1 1
1 1 1
1 1 1
| LOCATION |NPL| INCIDENT
| | | CATEGORY
{MEXICO
1
1
1
1
INEOSHO
1
1
(SPRINGFIELD
1
1
1
|ST LOUIS
1
I
1
N (ACTIVE PRODUCTION FACILITY
1
1
1
1
N (ACTIVE WASTE MANAGEMENT FACILITY
1
1
Y (OTHER
1
1
1
N (MIDNIGHT DUMP
1
1
1
( THREATS
1
(DIRECT CONTACT
(FOOD CHAIN CONTAMINATION
(SOIL CONTAMINATION
1
1
(DIRECT CONTACT
1
1
(DIRECT CONTACT
(DRINKING WATER CONTAMINATION
(GROUNDWATER CONTAMINATION
1
(DIRECT CONTACT
(SURFACE WATER CONTAMINATION
| GROUNDWATER CONTAMINATION
1
| MITIGATIVE ACTIONS
| COST |
| |$<000)|
(DISPOSAL
(PUMPED OUT CONTAMINANTS
(EXCAVATION
(SAMPLING, ANALYSIS
1
(DISPOSAL
(EXCAVATION
1
(WATER SUPPLIED
1
!
!
(RESTORATION
|SAMPLING,ANALYSIS
1
1
|$
1
1
1
1
|$
1
1
1$
1
1
1
1*
1
I
1
816|
I
!
I
I
272|
I
I
533 1
I
I
I
49|
I
I
I
-------
SUPERFUND EMERGENCY RESPONSE ACTIONS
HISTORICAL
|RG|ST| NAME | LOCATION
Ml I
| 07 | MO (ROSE CHEMICAL (HOLDEN
ill 1
NPL| INCIDENT | THREATS
| CATEGORY |
N (INACTIVE PRODUCTION FACILITY (DIRECT CONTACT
1 1
|07|MO|RUSHA FARM (LAWRENCE COUNTY] N (MIDNIGHT DUMP (DIRECT CONTACT
Mi I
Ml I
M 1 |
| (SOIL CONTAMINATION
1 1
1 (
j MITIGATIVE ACTIONS | COST 1
1
(SECURITY
1
(DISPOSAL
(EXCAVATION
(RESTORATION
1
($(000) (
1* 67|
1 1
|$ 231 (
I I
I |
I I
|07|MO|SOLID STATE CIRCUITS (REPUBLIC
I I I
I I I
III
I I I
I I I
I I I
|07|MO|SULLINS RESIDENCE (JEFFERSON CITY
I
I
I
I
I
Y (ACTIVE PRODUCTION FACILITY
I
I
I
I
I
I
Y (OTHER
I
I
I
I
I
IGROUNDWATER CONTAMINATION
(SOIL CONTAMINATION
I
I
I
I
I
(DIRECT CONTACT
(SOIL CONTAMINATION
I
I
I
I
(DISPOSAL |$
(CONTAMINANT CONTAINMENT/RETENTION]
(MIGRATION CONTROL |
(EXCAVATION |
(SECURITY j
(RESTORATION j
I I
(DISPOSAL |$
(EXCAVATION |
(SECURITY |
(RESTORATION |
(SAMPLING, ANALYSIS |
I I
778J
442 1
-------
SUPERFUND EMERGENCY RESPONSE ACTIONS
HISTORICAL
|RG|ST| NAME
1 1 1
|07|MO|TALLEY FARM
1 1 1
1 1 1
1 1 1
|07|MO|THOLOZAN STREET SITE
1 1 1
1 1 1
1 1 1
1 1 1
|07|MO|VALLEY GARDEN DRIVE
1 1 1
1 1 1
1 ! 1
1 1 1
| 07 |NE| ECONOMY PRODUCTS
I I 1
1 1 1
1 1 1
1 1 I
| LOCATION |NPL|
1 1 1
(LAURENCE COUNTY) N (MIDNIGHT
I I 1
1 1 1
1 1 1
(ST. LOUIS
1
1
1
1
(KANSAS CITY
1
1
1
1
(OMAHA
1
1
|
1
N (INACTIVE
1
1
1
1
N (MIDNIGHT
1
1
1
1
N (INACTIVE
1
1
1
1
INCIDENT | THREATS
CATEGORY |
DUMP (DIRECT CONTACT
(SOIL CONTAMINATION
1
1
WASTE MANAGEMENT FACILITY (DIRECT CONTACT
1
1
1
1
DUMP (DIRECT CONTACT
(FIRE/EXPLOSION
1
1
1
PRODUCTION FACILITY (DIRECT CONTACT
IFIRE/EXPLOSION
1
1
1
| MITIGATIVE ACTIONS
1
(DISPOSAL
(EXCAVATION
(RESTORATION
1
(DISPOSAL
(REPACKED DRUMS
(NEUTRALIZED MATERIALS
| SAMPLING, ANALYSIS
1
(DISPOSAL
(BULKED MATERIALS
(ORGANIZED MATERIALS
(SAMPLING, ANALYSIS
1
(DISPOSAL
(EXCAVATION
(SECURITY
(SAMPLING, ANALYSIS
1
| COST |
($(000) |
|$ 123 |
1 1
1 1
1 1
|$ 40 1
1 I
1 1
1 1
1 1
|$ 81 1
I I
I I
I I
I I
|$ 1190 |
I I
I I
I I
I I
-------
SUPERFUND EMERGENCY RESPONSE ACTIONS
HISTORICAL
|RG|ST| NAME | LOCATION
III 1
| 07 |NE| ENVIRONMENTAL SERVICES, INC. | OMAHA
III 1
III 1
III 1
II! 1
III 1
III 1
|07|NE|MARCY STREET | OMAHA
III 1
III 1
III 1
NPL| INCIDENT | THREATS
| CATEGORY |
N [INACTIVE PRODUCTION FACILITY | DIRECT CONTACT
| " IFIRE/EXPLOSION
1 1
1 1
1 1
1 1
1 1
N [INACTIVE PRODUCTION FACILITY (DIRECT CONTACT
| [FIRE/EXPLOSION
| [SURFACE WATER CONTAMINATION
1 1
| MITIGATIVE ACTIONS
1
[DISPOSAL
[REPACKED DRUMS
[ORGANIZED MATERIALS
[BULKED MATERIALS
[EXCAVATION
| SAMPLING, ANALYSIS
1
{SAMPLING, ANALYSIS
1
1
1
| COST |
|$(000>|
|$ 352 |
i 1
1 1
1 1
1 1
1 1
1 1
|$ 3|
1 1
1 1
1 1
-------
-------
U. S. EPA REGION 8
For Information Contact:
Chief, Emergency Response
Branch, Waste Management
Division
One Denver Place
99918th Street, Suite 500
Denver, CO 80202-2405
(303)293-1723
-------
SUPERFUND EMERGENCY RESPONSE ACTIONS
HISTORICAL
|RG|ST|
1 1 1
NAME
|08|CO|CALIFORNIA GULCH - MAESTES WELL
| LOCATION
1
ILEADVILLE
|NPL|
1 1
Y IOTHER
INCIDENT
CATEGORY
| THREATS
1
IDRINKING WATER
CONTAMINATION
1
1
| WATER
MITIGATIVE ACTIONS
SUPPLIED
| COST |
|$(000)|
|$ 8|
|AIR CONTAMINATION
IGROUNDWATER CONTAMINATION
|08|CO|DENVER RADIUM-B&C METALS [DENVER
III 1
Ml '1
|08|CO|EAGLE MINE |MINTURN
1 1 1
II 1
1 1 1
1 1 1
II - 1
II -1
|08|CO|FREJONLEY [ROUTT COUNTY
III I
III 1
III 1
III 1
Y IACTIVE PRODUCTION FACILITY
1
1
N*|MIDNIGHT DUMP
1
1
1
1
1
1
N [INACTIVE PRODUCTION FACILITY
1
1
1
1
[DIRECT CONTACT [CONTAMINANT CONTAINMENT/RETENTION |$
| [SAMPLING, ANALYSIS |
1 1 1
[DIRECT CONTACT [DISPOSAL |$
[SURFACE WATER CONTAMINATION [PUMPED OUT CONTAMINANTS |
| [CONTAMINANT CONTAINMENT/RETENTION |
| [MIGRATION CONTROL |
| [SECURITY |
| [STORAGE |
1 1 1
[DIRECT CONTACT [DISPOSAL |$
| [NEUTRALIZED MATERIALS |
| [EXCAVATION |
| [SAMPLING, ANALYSIS |
1 1 1
26 1
1
1
39|
1
* NOTE: NON-NPL SITE AT INITIATION OF REMOVAL. HOWEVER, CURRENTLY ON PROPOSED OR FINAL NPL.
-------
SUPERFUND EMERGENCY RESPONSE ACTIONS
HISTORICAL
|RG|ST| NAME | LOCATION
II 1 1
|08|CO|GENE MURREN JERIE CO.
Ill 1
Ml 1
III 1
|08|co|poc SPAS (JEFFERSON co.
Ill 1
III 1
III 1
III 1
|08|CO|WOODBURY CHEMICAL CO [COMMERCE CITY
III 1
III 1
III 1
|08|MT|MOTHERLODE FACILITY (EAST HELENA
III 1
III 1
III 1
III 1
Ml 1
Ml 1
NPL|
1
N (INACTIVE
1
1
1
N IMIDNIGHT
1
1
1
1
Y (INACTIVE
1
1
1
N (INACTIVE
1
1
1
1
1
1
INCIDENT | THREATS
CATEGORY |
WASTE MANAGEMENT FACILITY (DIRECT CONTACT
1
1
1
DUMP (DIRECT CONTACT
(SOIL CONTAMINATION
1
1
1
PRODUCTION FACILITY (DIRECT CONTACT
(SOIL CONTAMINATION
(SURFACE WATER CONTAMINATION
1
PRODUCTION FACILITY (DRINKING WATER CONTAMINATION
(GROUNDWATER CONTAMINATION
(SOIL CONTAMINATION
1
1
1
1
| MITIGATIVE ACTIONS | COST |
| ($(000) |
(SAMPLING, ANALYSIS |$ 16|
(REPACKED DRUMS | |
(ORGANIZED MATERIALS | |
I 1 1
(DISPOSAL |$ 12|
(REPACKED DRUMS | |
(EXCAVATION | |
(SAMPLING, ANALYSIS | |
I I I
(MIGRATION CONTROL |$ 15 (
(SECURITY | |
I I I
I I I
(DISPOSAL |$ 214 |
(CAPPED | (
(MIGRATION CONTROL | |
(EXCAVATION | |
(RESTORATION | |
(SAMPLING, ANALYSIS | |
I I I
-------
SUPERFUND EMERGENCY RESPONSE ACTIONS
HISTORICAL
|RG|ST| NAME | LOCATION
111 1
| 08 | NO | GRAND FORKS DRUM SITE (GRAND FORKS
III 1
III 1
III 1
NPL| INCIDENT
| CATEGORY
N | OTHER
1
1
1
| THREATS | MITIGATIVE ACTIONS
1 1
IFIRE/EXPLOSION | REPACKED DRUMS
| (ORGANIZED MATERIALS
| (STORAGE
1 1
| COST |
($(000) |
|$ 25|
1 1
1 1
1 1
|08|ND|VAAGAN-DAHLE FARM (CARPIO
1
1
1 1
1 1
1 1
|08|SD|HELDT CHEMICAL (SD SERVICES) | BROOK INGS
1 1
1 1
1 1
1 1
1 1
1
1 1
N (MIDNIGHT DUMP (DIRECT CONTACT
I (FOOD CHAIN CONTAMINATION
| (AIR CONTAMINATION
| (DRINKING WATER CONTAMINATION
I (SOIL CONTAMINATION
1 1
N (ACTIVE PRODUCTION FACILITY (DIRECT CONTACT
I (DRINKING WATER CONTAMINATION
I ' (SOIL CONTAMINATION
| (GROUNDWATER CONTAMINATION
1 1
1 1
1 1 1
1 1
(DISPOSAL
(EXCAVATION
(RESTORATION
[SAMPLING, ANALYSIS
1
1
(DISPOSAL
|$
1
1
1
1
1
|$
24 1
1
1
1
1
1
1175|
(CONTAMINANT CONTAINMENT/RETENTION) |
(MIGRATION CONTROL
(EXCAVATION
[RELOCATION/EVACUATION
(RESTORATION
(SAMPLING, ANALYSIS
1
1
1
1
1
1
1
I
I
I
I
I
I
-------
SUPERFUND EMERGENCY RESPONSE ACTIONS
HISTORICAL
|RG|ST| NAME | LOCATION
III 1
| 08 |UT| GREEN RIVER CYANIDE (EMERY CITY
III 1
II! 1
| 08 |UT| MONTGOMERY WARD STORE (MONT I CELLO
1 1 1
1 1 1
1 1 1
1 1 1
1 1 1
1 1 1
| 08 |UT| RANDALL RESIDENCE | MONT I CELLO
III 1
III 1
III 1
III 1
III 1
III 1
NPL| INCIDENT
| CATEGORY
N (MIDNIGHT DUMP
1
1
N | OTHER
1
1
1
1
1
1
N | OTHER
1
1
1
1
1
1
| THREATS
1
[DIRECT CONTACT
1
1
[DIRECT CONTACT
(SURFACE WATER CONTAMINATION
1
1
1
1
1
(DIRECT CONTACT
(SURFACE WATER CONTAMINATION
1
1
1
1
1
| MITIGATIVE ACTIONS
1
(DISPOSAL
(SAMPLING, ANALYSIS
1
(DISPOSAL
| CONTAMI N ANT CONTA I NMENT/RETENT I ON
(EXCAVATION
| RELOCAT I ON/EVACUAT I ON
(RESTORATION
(SAMPLING .ANALYSIS
1
(DISPOSAL
(EXCAVATION
| RELOCAT ION/EVACUAT ION
(SECURITY
(RESTORATION
(SAMPLING, ANALYSIS
1
CQST |
$(000) |
$ 3|
1
1
$ 106|
1
1
1
1
1
1
!$ 220 1
1
1
I
1
1
1
-------
SUPERFUND EMERGENCY RESPONSE ACTIONS
HISTORICAL
|RG|ST| NAME | LOCATION
Ml 1
|08|WY|ELLERBY REFINING SITE [MORTON
1 1 1
1 1 1
1 ' 1
1 1 1
1 1 1
|08|WY [TRUCK ACCIDENT [ARLINGTON
1 1 1
Ml 1
Ml I
III |
|NPL| INCIDENT | THREATS
| CATEGORY [
N [INACTIVE PRODUCTION FACILITY [DIRECT CONTACT
I (SOIL CONTAMINATION
1 [AIR CONTAMINATION
1 1
1 1
1 1
N [TRANSPORTATION -RELATED [DRINKING WATER CONTAMINATION
| [SOIL CONTAMINATION
| [SURFACE WATER CONTAMINATION
1 1
1 1
| MITIGATIVE ACTIONS
1
[DISPOSAL
[REPACKED DRUMS
[EXCAVATION
[RESTORATION
[SAMPLING, ANALYSIS
1
[DISPOSAL
[MIGRATION CONTROL
[EXCAVATION
[RESTORATION
1
| COST |
[$(000) |
|$ 14|
I |
I I
| 1
I I
|$ 6|
| 1
I |
I |
I I
-------
U.S. EPA REGIONS
For Information Contact:
Chief, Emergency Response
Section, Field Operations
Branch, Toxic and Waste
Management Division
215FreemontStreet
San Francisco, CA 94105
(415)974-7466
-------
SUPERFUND EMERGENCY RESPONSE ACTIONS
HISTORICAL
|RG|ST| NAME
I 1 1
|09|AS|ASPA POWER PLANT
i 1 1
! 1 1
1 1 1
i 1 1
1 1 1
|09|AS|SATALA POUER PLANT
Ml
I i 1
I i 1
I ! 1
|09|AS|TAFUNA POWER PLANT
1 I 1
I ! 1
i ! 1
| LOCATION |NPL| INCIDENT
| | | CATEGORY
[PAGO PAGO
(PAGO PAGO
1
1
1
1
(AMERICAN SAMOA
1
1
1
N (INACTIVE WASTE MANAGEMENT
1
1
1
1
1
N (ACTIVE PRODUCTION FACILITY
1
1
1
1
N (INACTIVE WASTE MANAGEMENT
1
1
1
| THREATS
1
FACILITY (DIRECT CONTACT
(DRINKING WATER CONTAMINATION
(AIR CONTAMINATION
(SURFACE WATER CONTAMINATION
| GROUND WATER CONTAMINATION
1
(DIRECT CONTACT
(SURFACE WATER CONTAMINATION
(SOIL CONTAMINATION
(ECOLOGICAL DAMAGE
1
FACILITY (DIRECT CONTACT
(GROUNDWATER CONTAMINATION
1
1
| MITIGATIVE ACTIONS
1
(DISPOSAL
(REPACKED DRUMS
(ORGANIZED MATERIALS
(SAMPLING, ANALYSIS
1
1
(DISPOSAL
(REPACKED DRUMS
(ORGANIZED MATERIALS
(SAMPLING.ANALYSIS
1
(DISPOSAL
(REPACKED DRUMS
(SAMPLING.ANALYSIS
1
| COST |
|$(000)|
|$
1
1
1
1
1
1$
1
1
1
1
|$
1
1
1
27|
1
1
1
1
1
20)
1
1
1
1
40 1
1
1
1
|09|AS|TAPUTIMU FARM
! 1 1
1 1 1
1 1 1
I 1 1
1 I 1
(TUTU I LA
1
1
1
1
1
N (INACTIVE PRODUCTION FACILITY
1
1
1
1
1
| DIRECT CONTACT
(AIR CONTAMINATION
1
1
1
i
(DISPOSAL |$ 12|
(REPACKED DRUMS |
(MIGRATION CONTROL |
(SECURITY |
(SAMPLING.ANALYSIS |
I I
-------
SUPERFUND EMERGENCY RESPONSE ACTIONS
HISTORICAL
|RG|ST| NAME
1 1 1
| LOCATION |NPL|
1 * '
INCIDENT
CATEGORY
| THREATS | MITIGATIVE ACTIONS | COST |
| | |$(000)|
|09|AZ
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 I
GILA RIVER INDIAN RESERVATION
MARICOPA COUNTY
|09|AZ|TKE CHROME SHOP (TUCSON
III 1
III 1
III 1
III 1
III 1
N
N
INACTIVE WASTE MANAGEMENT FACILITYJDIRECT CONTACT [DISPOSAL
|AIR CONTAMINATION (CAPPED
| (NEUTRALIZED MATERIALS
| (EXCAVATION
| (RELOCATION/EVACUATION
| (SECURITY
| (RESTORATION
| (SAMPLING, ANALYSIS
1 1
INACTIVE PRODUCTION FACILITY (DIRECT CONTACT (DISPOSAL
(AIR CONTAMINATION (ORGANIZED MATERIALS
(FIRE/EXPLOSION (EXCAVATION
(SOIL CONTAMINATION (SECURITY
| | SAMPLING, ANALYSIS
1 1
$ 520 1
.
$ 120 1
1
1
1
1
|09|AZ|TUBA CITY ACID TANK
I I I
I I I
(COPPER MINE
I
N (INACTIVE WASTE MANAGEMENT FACILITY(DIRECT CONTACT
| (FIRE/EXPLOSION
( |AIR CONTAMINATION
I I
(DISPOSAL
(NEUTRALIZED MATERIALS
22|
-------
SUPERFUND EMERGENCY RESPONSE ACTIONS
HISTORICAL
|RG|ST| NAME LOCATION
1
| 09 |CA| ABANDONED DRUM-CG |ANTIOCH
1
1 1
1 1
| 09 |CA| ABANDONED DRUM-CG | CARLSBAD
1
09 |CA| ANGELES NATIONAL FOREST | PASADENA
' 1
1 1
1
09|CA|ARNOLD WEED CONTROL SITE (RIVERSIDE
NPL| INCIDENT | THREATS
CATEGORY |
N [MIDNIGHT DUMP (DIRECT CONTACT
| [SOIL CONTAMINATION
1
1 1
N (MIDNIGHT DUMP [DIRECT CONTACT
! (SURFACE WATER CONTAMINATION
| [SOIL CONTAMINATION
1 1
N (MIDNIGHT DUMP (DIRECT CONTACT
I (FIRE/EXPLOSION
| ' (DRINKING WATER CONTAMINATION
| (SOIL CONTAMINATION
(SURFACE WATER CONTAMINATION
1 1
N (INACTIVE PRODUCTION FACILITY (DIRECT CONTACT
(SOIL CONTAMINATION
1
1
1
1
1
I
| MITIGATIVE ACTIONS * |
1 1$
(REPACKED DRUMS |$
(EXCAVATION |
[SAMPLING, ANALYSIS |
1 1
(DISPOSAL |$
(REPACKED DRUMS |
1 I
1 1
(DISPOSAL |$
(EXCAVATION |
(SECURITY |
1 1
1 1
1 1
(DISPOSAL |$
(REPACKED DRUMS |
(ORGANIZED MATERIALS |
(SOLIDIFIED MATERIALS |
(CONTAMINANT CONTAINMENT/RETENTION |
(EXCAVATION |
(SAMPLING, ANALYSIS |
1 i
COST |
(000)|
2|
1
1
1
21
1
1
1
*l
1
1
1
1
1
27 1
1
1
1
1
1
1
1
-------
SUPERFUND EMERGENCY RESPONSE ACTIONS
HISTORICAL
RG|ST( NAME | LOCATION |NPL| INCIDENT | THREATS
III 1
| CATEGORY |
09|CA|BLOOMFIELD AVENUE (SANTA FE SPRING] N (INACTIVE WASTE MANAGEMENT FACILITY (FIRE/EXPLOSION
1 1 1 1
[09|CA|BROWN'S FIELD SITE JCHULA VISTA
1 1 1
1 1 1
1 1 1
1 1 1
1 1 1
1 1 1
1 ! 1
1 1 1
1 1 1
09 |CA| CHEROKEE TRUCKING (LOS ANGELES
III 1
III 1
III 1
1 1 1
1 1
N (INACTIVE WASTE MANAGEMENT FACILITY (DIRECT CONTACT
| IFIRE/EXPLOSION
| (AIR CONTAMINATION
| (SOIL CONTAMINATION
| (ECOLOGICAL DAMAGE
1 1
1 1
1 1
1 1
1 1
N (ACTIVE PRODUCTION FACILITY (DIRECT CONTACT
1 1
1 1
1 1
1 1
| MITIGATIVE ACTIONS
1
(SECURITY
1
IDISPOSAL
(REPACKED DRUMS
(ORGANIZED MATERIALS
(BULKED MATERIALS
(MIGRATION CONTROL
(EXCAVATION
(SECURITY
(RESTORATION
(SAMPLING .ANALYSIS
1
(DISPOSAL
(ORGANIZED MATERIALS
(SECURITY
(SAMPLING, ANALYSIS
1
| COST |
|$(QOO)|
|$ 3|
1 1
|$ 167|
1
1
1
1
1
1
1
1
1
|$ 106
I I
I I
I I
I I
-------
SUPERFUND EMERGENCY RESPONSE ACTIONS
HISTORICAL
|RG|ST| NAME
1 1 1
| 09 |CA| COPPEROPOLIS SITE
1 1 1
1 1 1
1 1 1
1 1 !
1 ! I
! 1 1
1 09 |CA| CRYSTAL COVE BEACH -CG
1 1 1
1 1 1
|09|CA|DIXCO CHEMICAL SALES
i 1 1
1 1 1
I 1 1
| 09 |CA| DRAINAGE DITCH-CG
1 1 1
1 I 1
Ml
| LOCATION [NPL| INCIDENT
I | | CATEGORY
| COPPEROPOLIS
1
1
1
1
1
1
[SAN ONOFRE
1
1
[ANAHEIM
1
1
1
[MOUNTAIN VIEW
1
1
1
N [OTHER
1
1
1
1
1
1
N [MIDNIGHT DUMP
1
1
N [ACTIVE PRODUCTION FACILITY
1
1
1
N [MIDNIGHT DUMP
1
1
1
| THREATS
1
[DIRECT CONTACT
[AIR CONTAMINATION
1
1
1
1
1
[DIRECT CONTACT
[SOIL CONTAMINATION
1
[DIRECT CONTACT
[FIRE/EXPLOSION
1
1
[DIRECT CONTACT
[SURFACE WATER CONTAMINATION
[SOIL CONTAMINATION
1
| MITIGATIVE ACTIONS
1
| COST |
[$(000) |
[CONTAMINANT CONTAINMENT/RETENTION |$
[MIGRATION CONTROL
[EXCAVATION
[SECURITY
[RESTORATION
[SAMPLING, ANALYSIS
1
[DISPOSAL
[SAMPLING, ANALYSIS
1
[REPACKED DRUMS
[SECURITY
[SAMPLING, ANALYSIS
1
[SAMPLING, ANALYSIS
1
1
1
1
1
1
1
1
1
|$
1
1
|$
1
1
1
|$
1
1
1
250 1
1
1
1
1
1
1
4|
1
1
10|
1
1
1
2|
1
1
1
-------
SUPERFUND EMERGENCY RESPONSE ACTIONS
HISTORICAL
|RG|ST| NAME
1 1 I
| LOCATION ]NPL|
1 1 1
INCIDENT
CATEGORY
| THREATS | MITIGATIVE ACTIONS | COST |
| | |$(000)|
|09|CA|EL MONTE SITE
I I
I I
I I
I I
I I
I I I
I I I
I I I
|EL MONTE
N |OTHER
I
I
I
I
I
I
I
[DIRECT CONTACT
IFIRE/EXPLOSION
(SOIL CONTAMINATION
I
I
(DISPOSAL
[REPACKED DRUMS
{ORGANIZED MATERIALS
|EXCAVATION
|SECURITY
(RESTORATION
(SAMPLING,ANALYSIS
(SURFACE WATER CONTAMINATION
(SOIL CONTAMINATION
(ORGANIZED MATERIALS
(CAPPED
(EXCAVATION
(SECURITY
(SAMPLING.ANALYSIS
|$
| 09 |CA| FLOAT ING DRUM-CG
1 ! 1
| 09 |CA| GENERAL DISPOSAL
(LOS ANGELES | N (MIDNIGHT DUMP (SURFACE WATER CONTAMINATION (DISPOSAL
III I 1
(SANTA FE SPRING) " (INACTIVE WASTE MANAGEMENT FACILITY (FIRE/EXPLOSION (DISPOSAL
|$ 0|
1 1
|$ 1371|
-------
SUPERFUND EMERGENCY RESPONSE ACTIONS
HISTORICAL
|RG|ST| NAME | LOCATION
III 1
|09|CA|L. FRICKER CO. [ANAHEIM
III 1
III 1
III 1
III 1
III 1
III 1
|09|CA|LAGUNA BEACH II-CG [ORANGE CITY
III 1
Ml 1
Ml 1
III 1
|09|CA|LONG BEACH DRUM-CG (LONG BEACH
Ml 1
Ml 1
III 1
NPL| INCIDENT | THREATS
| CATEGORY |
N [ACTIVE PRODUCTION FACILITY (DIRECT CONTACT
| (FIRE/EXPLOSION
| (AIR CONTAMINATION
1 1
1 1
1 1
1 1
N [MIDNIGHT DUMP (DIRECT CONTACT
| (SOIL CONTAMINATION
1 1
1 1
1 1
N [MIDNIGHT DUMP [SURFACE WATER CONTAMINATION
1 . 1
1 1
1 1
| MITIGATIVE ACTIONS
1
[DISPOSAL
[ORGANIZED MATERIALS
[BULKED MATERIALS
[EXTINGUISHED FIRE
| RELOCAT I ON/EVACUAT I ON
[SAMPLING, ANALYSIS
1
(DISPOSAL
(SOLIDIFIED MATERIALS
(REPACKED DRUMS
[SAMPLING, ANALYSIS
1
[DISPOSAL
[REPACKED DRUMS
[SAMPLING, ANALYSIS
1
| COST |
[$(000) |
|$ 187|
I I
I I
I I
I I
I I
I I
|$ 1|
I I
I I
I I
I I
I* 11
I I
I I
I I
-------
SUPERFUND EMERGENCY RESPONSE ACTIONS
HISTORICAL
|RG|ST| NAME | LOCATION |NPL| INCIDENT | THREATS
Ml 1 II CATEGORY |
|09|CA|MCCOLL |FULLERTON
III 1
Ml 1
Ml 1
| 09 |CA| MYSTERY DUMP | SACRAMENTO
III 1
III 1
Ml 1
1 1 1 ' I
III 1
|09|CA|N TULIP ST.- ESCONDIDO |ESCONDIDO
III I
III 1
M 1 1
|09|CA|NICKEL SOLUTION RECYCLING |LOS ANGELES
1 1 1 1
Ml 1
Ml 1
1 M 1
Ml 1
Y (INACTIVE WASTE MANAGEMENT FACILITY [DIRECT CONTACT
| |AIR CONTAMINATION
1 1
1 1
N [MIDNIGHT DUMP [DIRECT CONTACT
| [FIRE/EXPLOSION
| [DRINKING WATER CONTAMINATION
| [SURFACE WATER CONTAMINATION
| [SOIL CONTAMINATION
| | ECOLOGICAL DAMAGE
N [INACTIVE PRODUCTION FACILITY [DIRECT CONTACT
| (SURFACE WATER CONTAMINATION
1 1
1 1
N [INACTIVE WASTE MANAGEMENT FACILITY [DIRECT CONTACT
| |AIR CONTAMINATION
| [SOIL CONTAMINATION
| | ECOLOGICAL DAMAGE
i 1 '
1 1
| MITIGATIVE ACTIONS
1
| COST |
|$COOO)|
[CONTAMINANT CONTAINMENT/RETENTION]* 23|
[MIGRATION CONTROL
(RESTORATION
1
[DISPOSAL
(SAMPLING, ANALYSIS
1
1
1
1
[DISPOSAL
[SECURITY
[SAMPLING, ANALYSIS
1
[DISPOSAL
[ORGANIZED MATERIALS
[BULKED MATERIALS
[MIGRATION CONTROL
[SECURITY
[SAMPLING, ANALYSIS
1 1
1 1
1 1
|$ 7|
1 1
1 1
1 1
1 1
1 1
|$ 44|
1 1
I 1
1 1
|$ 174|
1 1
1 .. 1
1 1
1 1
1 1
-------
SUPERFUND EMERGENCY RESPONSE ACTIONS
HISTORICAL
|RG|ST| NAME | LOCATION
III 1
|09|CA|NORWALK DRUM SITE JNORWALK
1 I
I I
I I
1 1
1 1
1 1
1 1
1 1
| 09 |CA| PARKS IDE DRIVE (SALTON SEA
III 1
III ' 1
III 1
1. 1 1 1
III 1
|09|CA|PURITY OIL SALES, INC. [MALAGA
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
NPL|
N (INACTIVE
N IMIDNIGHT
1
1
1
1
Y (INACTIVE
1
1
1
1
1
1
1
1
INCIDENT | THREATS
CATEGORY |
WASTE MANAGEMENT FACILITY [FIRE/EXPLOSION
DUMP | DIRECT CONTACT
|SOIL CONTAMINATION
1
1
1
1
PRODUCTION FACILITY [DIRECT CONTACT
[DRINKING WATER CONTAMINATION
[GROUNDWATER CONTAMINATION
(SOIL CONTAMINATION
| MITIGATIVE ACTIONS
1
[DISPOSAL
[BULKED MATERIALS
[REPACKED DRUMS
[ORGANIZED MATERIALS
[MIGRATION CONTROL
[EXCAVATION
(SECURITY
[SAMPLING, ANALYSIS
1
[DISPOSAL
[REPACKED DRUMS
(ORGANIZED MATERIALS
[EXCAVATION
(SAMPLING, ANALYSIS
1
(DISPOSAL
(ORGANIZED MATERIALS
(SOLIDIFIED MATERIALS
(BULKED MATERIALS
[EXCAVATION
(SECURITY
(RESTORATION
(SAMPLING, ANALYSIS
1
COST |
$(000) |
$ 185 1
1
1
1
1
1
1
1
$ 6|
$ 417|
1
1
1
1
1
1
-------
SUPERFUND EMERGENCY RESPONSE ACTIONS
HISTORICAL
|RG|ST| NAME | LOCATION |NPL| INCIDENT | THREATS | MITIGATIVE ACTIONS (COST
| | | CATEGORY | | |$<000)|
|09|CA|ROIC-SUN VALLEY |SUN VALLEY | N (ACTIVE PRODUCTION FACILITY (DIRECT CONTACT (DISPOSAL |$ 100
I
I
I
I
I
I
I
I
(AIR CONTAMINATION (ORGANIZED MATERIALS |
(SOLIDIFIED MATERIALS |
(NEUTRALIZED MATERIALS |
(REPACKED DRUMS |
(RELOCATION/EVACUATION |
(SECURITY |
| SAMPLING .ANALYSIS |
I I
| 09 | CA | SACRAMENTO RIVER-CG (SACRAMENTO | N (MIDNIGHT DUMP (DIRECT CONTACT (DISPOSAL |$ 2|
I I I
I I I
| | (SURFACE WATER CONTAMINATION | | j
I
I I II
|09|CA|SOUTH HALF MOON BAY-CG (SAN MATED COUNT) N (MIDNIGHT DUMP (DIRECT CONTACT (SECURITY |$ 20 1
| | | (SURFACE WATER CONTAMINATION (STORAGE | |
| | | (SOIL CONTAMINATION | |
II I II
I I I
-------
SUPERFUND EMERGENCY RESPONSE ACTIONS
HISTORICAL
|RG|ST| NAME | LOCATION
III 1
| 09 |CA| STANDARD CHEMICAL CO |HUNTINGTON
III 1
III 1
III 1
III 1
III 1
III 1
III 1
III 1
|09|CA|STRINGFELLOW ACID PITS |GLEN AVON HGTS
III 1
III 1
III 1
III 1
III 1
III 1
III 1
III 1
III 1
NPL| INCIDENT | THREATS
| CATEGORY |
N | INACTIVE PRODUCTION FACILITY | FIRE/EXPLOSION
ISOIL CONTAMINATION
1
1
1
1
1
1
1
Y [INACTIVE WASTE MANAGEMENT FACILITY|DIRECT CONTACT
| [DRINKING WATER CONTAMINATION
| [SURFACE WATER CONTAMINATION
| [GROUNDWATER CONTAMINATION
| [SOIL CONTAMINATION
1 1
1 1
1 1
1 1
1 1
| MITIGATIVE ACTIONS
1
[DISPOSAL
[REPACKED DRUMS
[ORGANIZED MATERIALS
(SOLIDIFIED MATERIALS
[MIGRATION CONTROL
[EXCAVATION
[SECURITY
[SAMPLING, ANALYSIS
1
[DISPOSAL
[PUMPED OUT CONTAMINANTS
[CAPPED
[BULKED MATERIALS
[MIGRATION CONTROL
[EXCAVATION
[SECURITY
[RESTORATION
|SAMPLING,ANALYSIS
1
| COST |
[$(000) |
|$ 197|
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
|$ 298 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
-------
SUPERFUND EMERGENCY RESPONSE ACTIONS
HISTORICAL
|RG|ST| NAME | LOCATION
1 1
|09|CA|TECATE SITE (TECATE
1 1
1
09|CA|UNKNOWN CHEMICAL DRUHS-CG |LAGUNA BEACH
1 1
09 |CA| WESTERN STATES REFINING |FONTANA
|NPL| INCIDENT | THREATS
| | CATEGORY |
N (INACTIVE WASTE MANAGEMENT FACILITY|AIR CONTAMINATION
1 | DIRECT CONTACT
1 IFIRE/EXPLOSION
1 [SOIL CONTAMINATION
1 IFOOD CHAIN CONTAMINATION
1 1
1 1
N IMIDNIGHT DUMP JSURFACE WATER CONTAMINATION
1 1
1 1
N [INACTIVE PRODUCTION FACILITY [DIRECT CONTACT
1 JGROUNDWATER CONTAMINATION
1 [SOIL CONTAMINATION
1 1
1 1
1 1
| MITIGATIVE ACTIONS
1
[DISPOSAL
[BULKED MATERIALS
[REPACKED DRUMS
[EXCAVATION
[RESTORATION
[SAMPLING, ANALYSIS
1
[DISPOSAL
|SAMPLING,ANALYSIS
1
[DISPOSAL
[NEUTRALIZED MATERIALS
(BULKED MATERIALS
[SECURITY
| SAMPLING, ANALYSIS
1
COST |
$(000) |
$ 35|
1
1
1
1
1
1
$ 1|
I
I
$ 110|
I
I
I
I
I
-------
SUPERFUND EMERGENCY RESPONSE ACTIONS
HISTORICAL
|RG|ST| NAME
1 1 1
|09|CA|YUCAIPA DRUG LAB
1 1 1
III
1 1 1
III
|09|HI|F/V VICTORIA II KEEHI LAGOON
1 1 1
1 1 1
1 1 1
|09|HI|PCB TRANSFORMERS-CG
1 1 1
1 1 1
|09|HI|PIER 35-CG
1 1 1
1 1 1
1 1 1
1 1 1
| LOCATION |
1
|SAN BERNARDINO
|
1
1
1
IOAHU
1
1
1
IOAHU
1
1
| HONOLULU
I
I
1
1
NPL| INCIDENT
| CATEGORY
N | INACTIVE PRODUCTION FACILITY
1
1
1
1
N ITRANSPORTATION-RELATED
1
1
1
N (MIDNIGHT DUMP
1
1
N (MIDNIGHT DUMP
1
1
1
1
| THREATS
1
(DIRECT CONTACT
IFIRE/EXPLOSION
|SOIL CONTAMINATION
1
1
ISURFACE WATER CONTAMINATION
[ECOLOGICAL DAMAGE
1
1
(DIRECT CONTACT
(SOIL CONTAMINATION
1
(DIRECT CONTACT
1
1
1
1
| MITIGATIVE ACTIONS | COST |
( . ($(000) |
(DISPOSAL |$
(REPACKED DRUMS |
(EXCAVATION I
(SAMPLING, ANALYSIS |
1 1
(DISPOSAL |$
(CONTAMINANT CONTAINMENT/RETENTION |
(SAMPLING, ANALYSIS |
1 1
(DISPOSAL |$
(SAMPLING, ANALYSIS |
1 1
(CONTAMINANT CONTAINMENT/RETENTION |$
(NEUTRALIZED MATERIALS |
(MIGRATION CONTROL |
(SECURITY |
1 1
25 1
1
1
1
1
50|
1
1
1
5|
1
1
3|
1
1
1
1
-------
SUPERFUND EMERGENCY RESPONSE ACTIONS
HISTORICAL
|RG|ST| NAME | LOCATION
1 1
|09|NV|BIG SPRING RANCH | SMARTER
1 1
III |
|09|NV|CYANIDE SPILL |GLENDALE
1 1
1 1 1
|09|NV|ECHO BAY STATION [LAKE MEAD
1 1
1 . 1
1 1 1
1 1 1
II. |
|09|NV|WASHOE DRUM [RENO
1 1
III 1
NPL| INCIDENT
| | CATEGORY
N IMIDNIGHT DUMP
1
N (INACTIVE PRODUCTION FACILITY
N IMIDNIGHT DUMP
N [MIDNIGHT DUMP
| THREATS
1
IFOOD CHAIN CONTAMINATION
|SOIL CONTAMINATION
1
IDIRECT CONTACT
(SOIL CONTAMINATION
' 1
[SOIL CONTAMINATION
1
1
1
1
1
IDIRECT CONTACT
[SOIL CONTAMINATION
1
| MITIGATIVE ACTIONS
1
ISAMPLING, ANALYSIS
1
1
[DISPOSAL
[NEUTRALIZED MATERIALS
1
| DISPOSAL
[MIGRATION CONTROL
[EXCAVATION
[SECURITY
[RESTORATION
1
[SAMPLING, ANALYSIS
[REPACKED DRUMS
1
| COST |
|$< 000)|
1$ 4|
1 |
1 1
|$ 9|
1 1
1 1
|$ 9|
1 1
1 1
1 I
1 1
1 1
|$ 2|
1 1
1 1
-------
SUPERFUND EMERGENCY RESPONSE ACTIONS
HISTORICAL
|RG|ST| NAME
1 1 1
|09|TT|PCB WASTES (1-UNIVERSITY OF GUAM)
I I I
I I I
I I I
|09|TT|PCB WASTES (11 -HARMON)
I I I
III
|09|TT|PCB WASTES (13-GPA/NAVAL STATION)
I I I
|09|TT|PCB WASTES (14-CNMI PCB)
I I I
I I I
|09|TT|PCB WASTES (15-SAIPAN)
I I I
I I I
| LOCATION |NPL| INCIDENT
I
[PACIFIC
I
I
I
[PACIFIC
I
I
[PACIFIC
I
[PACIFIC
I
I
(PACIFIC
I
I
I
TRUST T| N
I
I
I
TRUST T| N
I
I
TRUST T| N
I
TRUST T| Y
I
I
TRUST T| Y
I
I
| CATEGORY
[OTHER
I
I
I
[MIDNIGHT DUMP
I
I
[INACTIVE WASTE MANAGEMENT
I
[OTHER
I
I
[OTHER
I
I
| THREATS
I
[DIRECT CONTACT
!
I
I
(DIRECT CONTACT
I
I
FACILITY [DIRECT CONTACT
I
[DIRECT CONTACT
I
I
[DIRECT CONTACT
I
I
| MITIGATIVE ACTIONS
I
[DISPOSAL
[REPACKED DRUMS
| SAMPLING .ANALYSIS
I
[DISPOSAL
| SAMPLING, ANALYSIS
I
[SAMPLING.ANALYSIS
I
[DISPOSAL
| SAMPLING, ANALYSIS
I
[DISPOSAL
|SAMPLING,ANALYSIS
I
| COST |
($(000) |
|$
I
I
I
|$
I
I
I*
I
|$
I
I
|$
I
I
15|
1
1
1
13|
I
I
68 1
I
32 1
I
I
219|
I
I
-------
SUPERFUND EMERGENCY RESPONSE ACTIONS
HISTORICAL
IRGISTI NAME 1 LOCATION |NPL| INCIDENT | THREATS .| HITIGATIVE ACTIONS
III | || CATEGORY | |
|09|TT|PCB WASTES (16-PALAU) (PACIFIC TRUST T| Y [OTHER [DIRECT CONTACT [DISPOSAL
Ml | || [SOIL CONTAMINATION [SAMPLING, ANALYSIS
Ml III I I
|09|TT|PCB WASTES (17-MARSHALL ISLAND) [PACIFIC TRUST T| Y [INACTIVE WASTE MANAGEMENT FACILITY|DIRECT CONTACT [DISPOSAL
''I I || . | [SAMPLING, ANALYSIS
I I I III I |
|09|TT|PCB WASTES (18-GUAM DEPT. OF PUB HE|PACIFIC TRUST T| N
Ml II
I I I | |
I I I I I
I I I ' | |
|09|TT|PCB WASTES (19-MARSHALL ISLAND) [PACIFIC TRUST T| Y
IM | |
I I I | |
I I I ||
I I I I I
OTHER [DIRECT CONTACT [DISPOSAL
I [ORGANIZED MATERIALS
I [MIGRATION CONTROL
I [SAMPLING, ANALYSIS
I I
INACTIVE WASTE MANAGEMENT FACILITY [DIRECT CONTACT [DISPOSAL
I [ORGANIZED MATERIALS
I [MIGRATION CONTROL
I [SAMPLING, ANALYSIS
I I
| COST |
|$<000)|
|$ 49 1
I I
I I
|$ 76 1
I I
I I
|$ 20 1
I I
I I
I I
I I
|$ 25 1
I I
I I
I I
l i
-------
SUPERFUND EMERGENCY RESPONSE ACTIONS
HISTORICAL
|RG|ST| NAME
1 I 1
|09|TT|PCB WASTES (2-UNIVERSITY OF GUAM)
1 1 1
1 I 1
|09|TT|PCB WASTES (20-MARSHALL ISLAND)
1 1 1
1 1 1
1 1 1
|09|TT|PCB WASTES (21-EBEYE PUB)
1 1 1
1 1 1
III
|09|TT|PCB WASTES (25-PONAPE ELECT)
1 1 1
1 1 1
|09|TT|PCB WASTES (26-PONAPE)
1 1 1
1 1 1
| LOCATION |NPL| INCIDENT
1
IPACIFIC
1
1
[PACIFIC
1
1
1
(PACIFIC
1
1
1
[PACIFIC
1
1
IPACIFIC
1
1
1
TRUST T| N
1
1
TRUST T| N
1
1
1
TRUST T| Y
1
1
1
TRUST T| Y
1
1
TRUST T| N
1
1
| CATEGORY
[OTHER
1
1
[OTHER
1
1
1
[OTHER
1
1
1
[OTHER
1
1
[OTHER
1
1
| THREATS
1
[DIRECT CONTACT
[FIRE/EXPLOSION
1
[DIRECT CONTACT
1
1
1
[DIRECT CONTACT
1
1
1
[DIRECT CONTACT
1
1
[DIRECT CONTACT
1
1
| MITIGATIVE ACTIONS
1
[DISPOSAL
[SAMPLING .ANALYSIS
1
[DISPOSAL
[MIGRATION CONTROL
[SAMPLING, ANALYSIS
1
[DISPOSAL
[MIGRATION CONTROL
[SAMPLING, ANALYSIS
1 '
[DISPOSAL
[SAMPLING, ANALYSIS
1
[DISPOSAL
[MIGRATION CONTROL
[SAMPLING, ANALYSIS
| COST |
[$(000) |
|$
1
1
|$
1
1
1
|$
1
1
1
1$
1
1
|$
1
1
14|
I
I
19|
I
I
I
17|
1
1
1
29|
1
1
29 1
1
1
I I
-------
SUPERFUND EMERGENCY RESPONSE ACTIONS
HISTORICAL
|RG|ST| NAME
1 1 1
|09|TT|PCB WASTES
1 1 1
1 1 1
(09 |TT [PCS WASTES
1 1 1
1 1 1
(09 |TT (PCS WASTES
1 1 1
1 1 1
| 09 |TT (PCS WASTES
III
1 1 1
|09|TT|PCB WASTES
1 1 1
1 1 1
| LOCATION |NPL| INCIDENT
1
(27-PONAPE DPFOR) [PACIFIC
1
1
(28-PONAPE) [PACIFIC
1
1
(29-KOSRAE) (PACIFIC
1
1
(3-GUAM MEMORIAL HOSPITA [PACIFIC
1
1
(30-TRUK) [PACIFIC
1
1
1
TRUST T| N
1
1
TRUST T| N
1
1
TRUST T| Y
1
1
TRUST T| N
1
1
TRUST T| Y
1
1
| CATEGORY
(OTHER
1
1
(OTHER
1
1
(OTHER
1
1
(OTHER
1
1
(OTHER
1
1
| THREATS
1
(DIRECT CONTACT
1
1
(DIRECT CONTACT
1
1
(DIRECT CONTACT
(SOIL CONTAMINATION
1
(DIRECT CONTACT
1
1
[DIRECT CONTACT
(SOIL CONTAMINATION
1
| MITIGATIVE ACTIONS
1
(DISPOSAL
[SAMPLING .ANALYSIS
1
(DISPOSAL
[SAMPLING, ANALYSIS
1
(DISPOSAL
(ORGANIZED MATERIALS
1
(DISPOSAL
[SAMPLING, ANALYSIS
1
(DISPOSAL
[SAMPLING, ANALYSIS
1
| COST |
|${000)|
|$ 15|
1 1
1 1
|$ 13|
I I
I I
|$ 18|
1 1
1 1
|$ 18|
1 1
1 1
|$ 89|
1 1
1 1
-------
SUPERFUND EMERGENCY RESPONSE ACTIONS
HISTORICAL
|RG|ST| NAME
1 1 1
|09|TT|PCB WASTES
1 1 1
1 1 .1
|09|TT|PCB WASTES
1 1 1
1 1 1
|09|TT|PCB WASTES
1 1 1
1 1 1
|09|TT|PCB WASTES
I 1 1
1 1 1
|09|TT|PCB WASTES
1 1 1
| LOCATION |NPL| INCIDENT
1
(32-YAP) [PACIFIC
1
1
(33-YAP) IPACIFIC
1
1
(4-GUAM PUBLIC HOSPITAL) [PACIFIC
1
1
(5-GUAM DEPT OF AGRICULT| PACIFIC
1
1
(7-GUAM DEPT OF ECONOMIC|PACIFIC
1
1
TRUST T| Y
1
1
TRUST T| N
1
1
TRUST T| N
1
1
TRUST T| N
1
1
TRUST T| N
1
| CATEGORY
IOTHER
1
1
IOTHER
1
1
IOTHER
1
1
IOTHER
1
1
IOTHER
1
| THREATS
1
| DIRECT CONTACT
|SOIL CONTAMINATION
1
| DIRECT CONTACT
1
1
(DIRECT CONTACT
1
1
IDIRECT CONTACT
1
1
[DIRECT CONTACT
[SOIL CONTAMINATION
| MITIGATIVE ACTIONS
1
[DISPOSAL
[SAMPLING, ANALYSIS
1
[DISPOSAL
[SAMPLING, ANALYSIS
1
[DISPOSAL
[SAMPLING, ANALYSIS
1
[DISPOSAL
[ORGANIZED MATERIALS
1
[DISPOSAL
[ORGANIZED MATERIALS
| COST |
[$(000) |
|$
1
1
|$
1
1
|$
1
1
|$
1
1
|$
1
62 1
1
1
24 1
1
1
20 1
1
1
'17|
I
I
21 1
I
III I II
[MIGRATION CONTROL
|SAMPLING,ANALYSIS
-------
SUPERFUND EMERGENCY RESPONSE ACTIONS
HISTORICAL
|RG|ST| NAME
1 1 1
|09|TT|PCB WASTES (8- GUAM PHYS)
1 1 1
1 1 1
1 1 1
|09|TT|PCB WASTES (9- GUAM PHL)
1 1 1
II!
|09|TT|PCB WASTES (A-GUAM DEPT OF
1 1 1
I 1 1
|09|TT|PCB WASTES (B-DELA CRUZ)
1 1 1
1 1 1
1 1 1
|09|TT|PCB WASTES (C-MAJURO HOSP)
| LOCATION |NPL| INCIDENT
1
[PACIFIC
1
1
1
(PACIFIC
1
1
EDUCATIO|PACIFIC
1
1
(PACIFIC
1
1
1
(PACIFIC
1
TRUST T| N
1
1
1
TRUST T| N
1
1
TRUST T| N
1
1
TRUST T| N
1
1
1
TRUST T| N
| CATEGORY
(OTHER
1
1
1
(OTHER
1
1
(OTHER
1
1
(INACTIVE WASTE MANAGEMENT
1
1
1
(OTHER
| THREATS
1
(DIRECT CONTACT
1
1
1
(DIRECT CONTACT
1
1
(DIRECT CONTACT
(SOIL CONTAMINATION
1
FACILITY (DIRECT CONTACT
1
1
1
(DIRECT CONTACT
| MITIGATIVE ACTIONS
1
[DISPOSAL
(REPACKED DRUMS
(SAMPLING, ANALYSIS
1
(DISPOSAL
(SAMPLING, ANALYSIS
1
(DISPOSAL
(SAMPLING, ANALYSIS
1
(DISPOSAL
(ORGANIZED MATERIALS
(SAMPLING, ANALYSIS
1
(DISPOSAL
| COST |
|$< 000)|
|$ 92 1
1 1
1 1
1 1
|$ 16|
I - I
I I
|$ 92 1
I I
I I
|$ 21 1
I I
I I
I I
|$ 92 1
I I
(SAMPLING,ANALYSIS
-------
SUPERFUND EMERGENCY RESPONSE ACTIONS
HISTORICAL
1
|RG|ST| NAME | LOCATION |NPL| INCIDENT
III | || CATEGORY
|09|TT|PCB WASTES (D-MEDICAL CLINIC) [PACIFIC TRUST T| N [OTHER
III 1 II
III 1 II
|09|TT|PCB WASTES (F-PROT YAP) [PACIFIC TRUST T| N [OTHER
III 1
III 1
|09|TT|PCB WASTES (G-USCG LORAN) [PACIFIC TRUST T
III '1
III 1
III 1
III 1
1
1
N [OTHER
1
1
1
1
| THREATS
1
[DIRECT CONTACT
1
1
[DIRECT CONTACT
1
1
[DIRECT CONTACT
|SOIL CONTAMINATION
1
1
1
| MITIGATIVE ACTIONS
1
[DISPOSAL
[SAMPLING, ANALYSIS
1
[DISPOSAL
(SAMPLING, ANALYSIS
1
[DISPOSAL
[MIGRATION CONTROL
[SECURITY
(SAMPLING, ANALYSIS
1
| COST |
($(000) |
|$ 10|
I I
I I
|$ 13|
I I
I I
|$ 92 1
I I
I I
I I
I I
-------
U. S. EPA REGION 10
ALSO:AK
For Information Contact:
Chief, Emergency Response
Section, Hazardous Waste Division
1200 Sixth Avenue
Seattle, WA 98101
(206)442-1196
-------
SUPERFUND EMERGENCY RESPONSE ACTIONS
HISTORICAL
|RG|ST| NAME LOCATION |NPL| INCIDENT
III || CATEGORY
|10|AK|BENDLE'S ROAD OILING CO. JCHUGIAK
Ml I
III I
III I
III I
|10|AK|OHLSON MOUNTAIN PCB SITE |HOMER
III I
III I
III I
III I
III I
|10|ID|ARRCOM (DREXLER ENTERPRISES) (RATHDRUM
I I I
I I I
I I I
I I I
I I I
N (ACTIVE PRODUCTION FACILITY
I
I
I
I
N [INACTIVE WASTE MANAGEMENT
I
I
I
I
I
| THREATS
I
| DIRECT CONTACT
[SURFACE WATER CONTAMINATION
|SOIL CONTAMINATION
I
I
FACILITY|DIRECT CONTACT
[GROUNDWATER CONTAMINATION
|SOIL CONTAMINATION
I
I
I
Y | INACTIVE PRODUCTION FACILITY [DIRECT CONTACT
[DRINKING WATER CONTAMINATION
| GROUNDWATER CONTAMINATION
[SOIL CONTAMINATION
I
I
| MITIGATIVE ACTIONS
I
[DISPOSAL
[PUMPED OUT CONTAMINANTS
| COST |
[$(000) |
|$ 139|
I I
[CONTAMINANT CONTAINMENT/RETENTION] |
| SAMPLING, ANALYSIS
I
[DISPOSAL
[REPACKED DRUMS
[ORGANIZED MATERIALS
[EXCAVATION
[SAMPLING, ANALYSIS
I
[DISPOSAL
| PUMPED OUT CONTAMINANTS
(EXCAVATION
[SECURITY
[RESTORATION
I
I I
I I
|$ 100|
I I
I I
I I
I I
I I
|$ 69 1
I I
I I
I I
I I
I I
-------
SUPERFUNO EMERGENCY RESPONSE ACTIONS
HISTORICAL
|RG|ST| NAME
1 1 1
| LOCATION |NPL|
1 1 1
INCIDENT
CATEGORY
I THREATS | MITIGATIVE ACTIONS | COST |
1 I [$(000) |
|10|ID|BUNKER HILL MINING AND METALLURGY [SMELTERVILLE
Y I INACTIVE PRODUCTION FACILITY
(DIRECT CONTACT
|AIR CONTAMINATION
[SOIL CONTAMINATION
IGROUNDWATER CONTAMINATION
(SURFACE WATER CONTAMINATION
I
[CONTAMINANT CONTAINMENT/RETENTION|$ 650|
|BULKED MATERIALS | |
[MIGRATION CONTROL | |
|EXCAVATION | |
(SECURITY | |
[RESTORATION | |
(STORAGE
I
|10|ID[COMEBACK MINE
[PIONEERVILLE
N [ACTIVE PRODUCTION FACILITY
[DIRECT CONTACT
[DRINKING WATER CONTAMINATION
[SURFACE WATER CONTAMINATION
IGROUNDWATER CONTAMINATION
[DISPOSAL [$ 132|
[PUMPED OUT CONTAMINANTS | |
[CONTAMINANT CONTAINMENT/RETENTION] |
[NEUTRALIZED MATERIALS | |
[MIGRATION CONTROL ,5 | |
[RESTORATION | |
|10|ID|EMMITT PCB
|EMMITT
N [OTHER
[DIRECT CONTACT
[SURFACE WATER CONTAMINATION
IGROUNDWATER CONTAMINATION
[SOIL CONTAMINATION
[DISPOSAL |$ 20|
[REPACKED DRUMS | |
[CONTAMINANT CONTAINMENT/RETENTION| |
[EXCAVATION | |
[SAMPLING,ANALYSIS | |
-------
SUPERFUND EMERGENCY RESPONSE ACTIONS
HISTORICAL
RG|ST| NAME LOCATION
1
|10|ID|MUNICIPAL LANDFILL (POCATELLO
I I I
I I I
I I I
I I I
| 10| ID [PACIFIC HIDE & FUR RECYCLING (POCATELLO
I
I
I
I
I
I
1 10 |OR | NORTHWEST DUST CONTROL (WHITE CITY
I I
I I I
III I
III I
NPL| INCIDENT
| CATEGORY
N (MIDNIGHT DUMP
I
I
I
I
Y (INACTIVE WASTE MANAGEMENT
N (ACTIVE PRODUCTION FACILITY
I
I
I
I
| THREATS
I
|AIR CONTAMINATION
| DIRECT CONTACT
(FIRE/EXPLOSION
(SOIL CONTAMINATION
I
FACILITY|DRINKING WATER CONTAMINATION
IGROUNDWATER CONTAMINATION
(SOIL CONTAMINATION
I
I
I
I
(DIRECT CONTACT
(SURFACE WATER CONTAMINATION
(SOIL CONTAMINATION
I
I
| MITIGATIVE ACTIONS
I
(DISPOSAL
I
I
I
I
(DISPOSAL
(REPACKED DRUMS
(ORGANIZED MATERIALS
(EXCAVATION
(SECURITY
| SAMPLING, ANALYSIS
I
(DISPOSAL
(PUMPED OUT CONTAMINANTS
(NEUTRALIZED MATERIALS
|SAMPLING,ANALYSIS
I
COST
$(000) |
$ 6|
!
$ 227]
|$ 245 1
I I
I I
I
I
-------
SUPERFUND EMERGENCY RESPONSE ACTIONS
HISTORICAL
|RG|ST| NAME
! 1 1
| 10 [OR (UNION AVE PCB SITE
I I I
I I I
| 10 | OR | UN I TED CHROME PRODUCTS INC.
I I I
I I I
I I I
I I I
I I I
I I I
I I I
| LOCATION
I
(PORTLAND
I
I
ICORVALLIS
I
I
I
I
I
I
I
NPL| INCIDENT
( CATEGORY
N (TRANSPORTATION-RELATED
I
I
Y [INACTIVE PRODUCTION FACILITY
I
I
I
I
I
I
I
| THREATS
I
(DIRECT CONTACT
(AIR CONTAMINATION
I
[DIRECT CONTACT
| GROUND WATER CONTAMINATION
(SOIL CONTAMINATION
I
I
I
I
I
| MITIGATIVE ACTIONS
I
(MIGRATION CONTROL
I
I
(DISPOSAL
(REPACKED DRUMS
(PUMPED OUT CONTAMINANTS
(ORGANIZED MATERIALS
(EXCAVATION
(SECURITY
(SAMPLING.ANALYSIS
I
| COST |
($(000) |
|$ 0|
I I
I I
|$ 78|
I I
I I
I I
I I
I I
I I
I I
| 10 |WA | ABANDONED DRUM
I ! I
I I I
I I I
| 10 | WA | AMERICAN SURPLUS
I I I
I I I
I I I
I I I
I I I
I I I
I I I
(KALAMA
I
I
I
(TACOMA
I
I
I
I
I
I
I
N (MIDNIGHT DUMP
I
I
I
N (INACTIVE WASTE MANAGEMENT
I
I
I
I
I
I
I
(DIRECT CONTACT
(SOIL CONTAMINATION
I
I
FACILITY | DIRECT CONTACT
(FIRE/EXPLOSION
(DRINKING WATER CONTAMINATION
(AIR CONTAMINATION
(SURFACE WATER CONTAMINATION
IGROUNDWATER CONTAMINATION
[SOIL CONTAMINATION
I
(DISPOSAL
(EXCAVATION
| SAMPLING, ANALYSIS
I
(DISPOSAL
(REPACKED DRUMS
(SOLIDIFIED MATERIALS
(SECURITY
[SAMPLING, ANALYSIS
I
I
I
|$ 1
I
I
I
|$ 131
I
I
I
I
I
I
I
-------
SUPERFUND EMERGENCY RESPONSE ACTIONS
HISTORICAL
|RG|ST| NAME | LOCATION
III 1
| 10 |WA| LITTLE LEAGUE PESTICIDE | ORCHARD
I I I I
III I
III I
|10|WA|MARROWSTONE ISLAND-CG |PUGET SOUND
III I
III I
III I
| 10 | WA | NORTHWEST TRANSFORMER |EVERSON
I I I I
III I
III I
III I
|10|WA|PCB CONTAMINATION |WOODENVILLE
III I
III I
Ml I
NPL| INCIDENT
| CATEGORY
N | OTHER
I
I
I
N | MIDNIGHT DUMP
I
I
I
Y | INACTIVE WASTE MANAGEMENT
I
I
I
I
N [MIDNIGHT DUMP
I
I
I
| THREATS
I
[DIRECT CONTACT
I
I
I
[SURFACE WATER CONTAMINATION
I
I
I
FACILITY [DIRECT CONTACT
[SOIL CONTAMINATION
I
I
I
[DIRECT CONTACT
[FIRE/EXPLOSION
[SOIL CONTAMINATION
I
| MITIGATIVE ACTIONS | COST |
| |$(000)|
[DISPOSAL |$ 7|
[EXCAVATION | |
[RESTORATION | |
I I I
[DISPOSAL |$ 14 |
[REPACKED DRUMS | |
[SAMPLING, ANALYSIS | |
I I I
[DISPOSAL |$ 597 |
[EXCAVATION | |
[SECURITY | |
[SAMPLING, ANALYSIS | |
I I I
[DISPOSAL |$ 9|
[REPACKED DRUMS | |
I I I
I I I
-------
SUPERFUND EMERGENCY RESPONSE ACTIONS
HISTORICAL
|RG|ST| NAME
1 1 1
| 10 |WA| SPOKANE DRUM FIRE
I I I
| 10 |UA {WESTERN PROCESSING CO., INC.
1 1 1
1 1 1
1 1 1
1 1 1
1 1 1
1 1 1
1 1 1
|10|UA|UILLIAMS & SON
I I I
I I I
I I I
I I I
| LOCATION
I
| SPOKANE
I
(KENT
I
I
I
I
I
I
I
IBUCADA
I
I
I
I
NPL| INCIDENT
| CATEGORY
N {MIDNIGHT DUMP
I
Y (ACTIVE WASTE MANAGEMENT FACILITY
I
I
I
I
I
I
I
N {ACTIVE PRODUCT I OH FACILITY
I
I
I
I
| THREATS
I
IFIRE/EXPLOSION
I
{DIRECT CONTACT
IFIRE/EXPLOSION
{SURFACE WATER CONTAMINATION
IGROUNDWATER CONTAMINATION
{SOIL CONTAMINATION
I
I
I
[DIRECT CONTACT
{SURFACE WATER CONTAMINATION
IGROUNDWATER CONTAMINATION
{SOIL CONTAMINATION
{AIR CONTAMINATION
| MITIGATIVE ACTIONS COST |
| {$(000) |
{EXTINGUISHED FIRE |$ 3|
I II
{DISPOSAL |$ 1018|
{PUMPED OUT CONTAMINANTS
{ORGANIZED MATERIALS
{CAPPED
{MIGRATION CONTROL
{SECURITY
| SAMPLING, ANALYSIS
I
{DISPOSAL |$ 138
{EXCAVATION
(SAMPLING, ANALYSIS
I I
I
ftU.S. Government Printing Office : 1987 -516-002/80507
-------
------- |