©EPA
           United States
           Environmental Protection
           Agency
                  Office of
                  Solid Waste and
                  Emergency Response
EPA 540-R-98-001
Publication 9200.3-14-1E-P
PB98-963201
July 1, 1998
           Superfund
Superfund/Oil Program Implementation Manual
Fiscal Year 99/00
          Program Implementation Guidance for OERR, OSRE, FFRRO,
          FFEO and the Oil Program

          Program Goals and Planning Requirements

          Program Implementation Procedures

-------

-------
                 UNITED  STATES ENVIRONMENTAL  PROTECTION AGENCY
                                WASHINGTON,  B.C. 20460
                                     26 JUNE 1998
MEMORANDUM
SUBJECT:   FY 1999/2000 Superfund/Oil Program Implementation Manual
FROM:
TO:
JjSP™)  	
 
-------
                                  DISTRIBUTION LIST
                                       Addressees
TO:   Superfund Branch Chiefs (Regions I - X)
      Office of Regional Counsel (Regions I -X)

CC:   Superfund National Policy Managers (Regions I - X)
      Information Management Coordinators (Regions I - X)
      Budget Coordinators (Regions I  - X)
      Steve Luftig
      Barry Breen
      Susan Bromm
      OERR Center Directors and Senior Process Managers
      Linda Garczynski (5101)
      Ben Hamm (5101)
      Linda Boornazian
      Sandra Connors
      Charles Breece
      Fredrick Stiehl (OECA/2222A)
      Jim Woolford
      Dan Dickson
      Dana Stalcup
      Walt Johnson
      Will Bowman (5103)
      Eric Burman (5103)
      Terry Eby
      Randy Hippen
      Dottie Pipkin
      Renee Wynn  (5101)
      Angelo Carasea
      Sharon Blandford
      Ken Lovelace
      Terry Keidan
      Richard Jeng
      Angelo Carasea

-------
 Superfund/Oil Program Implemenation Manual (SPIM), FY99/00
                                                                                         FY99/00 SPIM DEVELOPMENT SCHEDULE
                              DEVELOP SCHEDULE
                              COMPILE Frsi/WSUfERfWID fOCUS FORUM (SFF) MATERIALS
                              FmtOOSFF
                              LIST ACTION ITEMS from SFF
                              WRITE MINUTES FORUEETINQ
                                          TING
                              DEVELOP DRAFT MANUAL •SEEGPRACOMMENTBELOW
                              REVIEW DRAFT
                              CHANGE DRAFT & PRINT REVIEW COPIES
                              DISTRIBUTE DRAFT FOR REVIEW
                              SUBJECT MATTER EXPERT, 'ISMKt XKVIRW
                                                               Chapter I
                                                               Chapter 3
                                                               Chapter 3
                                                              Appendix C
                                                              AooenfixD
                                                              Appendix If
                              OSRE REVIEW/APPENDIXC
                              INCORPORATE CHANGES + COORDW.TE ISSUES aSSffl
                              REVIEWDRAFT
                              INCORPORATE CHANGES
                              DISTRIBUTE DRAFT
                              REVIEW DRAFT
                              PREPARE NOTEBOOKS
                              REVIEW NOTEBOOKS
                              REVIEW COMMENTS NOTEBOOKS viOSRE STAFF
                              REVIEW COMMENTS NOTEBOOKS w'SME + HOTRS STAFF
                              INCORPORATE CHANGES
                              REVIEW MANUSCRIPT                      ,   .
                              OBTAIN SIGNATURE FOR FINAL                    "
                              PRINT LOOTED NUMBER OF ADVANCE COPIKS   :   -
                              PREPARE RESPONSE SUMMARY  :::   .. '   :
                              PRIM Ffo&OOSCAP MANUAL                     ,        '
                              DISTRIBUTE LIMITEDNllMaER OFADVANCED CtiPMS
                             DISTRIBUTE FflS/OO SOAP MANUAL
                             PREPARE FnS/00 CODING* USER GUIDE
                             REVIEW DRAFT CODING USRSaUIDE
                             INCORPORATE CHANGES TO CODING GUIDE ;
                             PRINT FrS8/00 CODING + USER GUIDE. LIMITED NUMBER OF COPIES-
                             MAINTAIN n98M SPIM (CHANGE PAGES)
                                            * GPRA evokithn iilllparallel SPIM development Expect late SPIM changa to reflect GPRAdevelopme
SUBJECT
MATTER
EXPERTS (SUE)
RESP/PERSON
R While
r SAmUwa wuwn snjdu
ffgtrt+Reg't
R White, etal
R White
RWUtc
Contractor
R White
Contractor
R White
ffftn
R Whlte/etal
CarateatBlandfard
DPIpklnfALudtngto
R Hoogerhelae
R Whlte/etal
: SCallen
RWym
WJohwon
DStalap
WRou
ACaratea
RWhlte/OSRE
Coansaar
R White
Contractor
R White
Rephmi + Hqtri
Contractor
R White
ROWU+OSRS
fltwuu+THo stiff
Contractor^
R White - '
R White ..
Contractor ,
R While
R White
R White .
Contractor
Cullcn/Whlle
Contractor
R While
Contractor
PLANNED
START
DATE

20-Aug-97
m^ep-97
03-Nov-97
07-Nm-97
09-Nov-97
2S.Nm.97
24-Nov-97
OSJan-98
08Jan-9B
13Jan-98
H-Jan-9a
14Jon.9S
14Jon-98
14-Jort-98
14Jon-98
14Jan-9a
14Jan-98
14Jan-98
14-Jan-98
14Jan.98
H^an-fS
14-Jan-98
22Jan-98
10-Fti-SS
2S-Feb-98
27.Feb.98
03-Mar-98 •
OS-Mar-91
21-Apr-98
22-May-os
21Mr/-9a
27My-98
28-May-9S
IS-Jun-fS
24-Jua-98
28JUay-98: -
oijui.<>a
Ol-M-9/1
27-AUS-98
OlM-ia
13-Aug-!8
2i.Aag-fa -
31-Aug-9a
OlJul-98
ACTUAL
START
DATE

20-AuS-97
02-Scp-97
03-Nov-97
07-Nov-97
07-Nov-97
2S-Nov-97
24.Nov.97
31.Dec.97
31-Dec-97
tl-Dec-97

31-Dcc-97
31-Dcc-97
3l-Dcc-97
31-Dcc-97
31-Dec-97
31-TXC-97
31-Dcc-97
31-Dec-97
31-Dec-97
31.Dec.97
31-Dec-97
22Jon-98
lO-Feb-yS
24-Feb-98
03-Mor-98
04Mor-98
OS-M»r-98
2I-Apr-98
: . 22.Mty.9a
; , 21-May-98
21-k{ay-iS
2a-May-98 :
J9-Jan-98 •
24-Jun-98 .
. ; 28May.98








PLANNED
COMPLETION
DATE

13&P-97
ltJ)a-97
Oo.Nov-97
13-Nov-97
02-Dec-97
2S.Nov.97
31-Dec-97
07Jon.98
12-Jan-98
14Jan-98
09.Feb-98
09-Feb-98
09-Feb-9a
09-Feb-98
09-Feb-98
09-Feb-93
09-Feb-98
09-Feb-98
09-Feb-lS
09-Feb-98
09-Feb-9a
09-Feb-9a
22Jon-98
24-Feb-ia
2t-Feb-9a
02.Mor.98
04-Mor-9a
20-Apr-9»
21Moji-9a
2S.Mey.98
, . 22.May-ia
27.Moy.98
lSJun-98
lUini-HS
25Jun-98 ;
' 14-Jul-98
,,; 26-Aug-9a
',, 03-Jul-9a
. 31-Aug-98.
12-Aug-9B . •
• • 20^Aug.f8~
" 28-Atig.98'
03-Stp.}3
Ol-Jul-99
ACTUAL
COMPLETION
. DATE

124ep.97
lS-Ocl-97
Oi-Nov-97
13-Nov-97
02-Dec-97
2S-Nov-97
31-Dec-97
31-Dec-97
31-Dec-97
31-Dcc-97

09-Feb-98
26-Jon-9a
30Jon-98
04-Feb.S>a
09.Fet.98 ' -
09-Feb-9B
JSJho-PS
30Jon-9a '
ll-Feb.98-
Ol-Jon.98
3Mon-98
22Jon-98
24-Fcb-9a .
03-Mar-98 OSRE Signed letter 3 MAR 98
04Mar.98
04-Mar-98
20.Afr.9S • r . . .;
2I.May.f3
2i-Mcy-iS -. - .
21My-98 ..,'•• ,-,.
27-May-98' -•/•. '. " .' '
ia-Jun-98 !
M-Jm-PS
24-Jm-98









                                                                                                                                    file: 99tched.\tk4
Revised 27 JUN98
                                                                                                                                                                                                      FY99/00 SPIM

-------

-------
           United States
           Environmental Protection
           Agency
Office of
Solid Waste and
Emergency Response
EPA 540-R-98-001
Publication 9200.3-14-1E-P
PB98-963201
July 1, 1998
           Superfund
©EPA   Superfund/Oil Program Implementation Manual
          Fiscal Year 99/00
          Program Implementation Guidance for OERR, OSRE, FFRRO,
          FFEO and the Oil Program

          Program Goals and Planning Requirements

          Program Implementation Procedures


-------
                                          DISCLAIMER

    The policies and procedures established in this document are intended solely for the guidance of employees of the
U.S. Environmental Protection Agency. They are not intended and cannot be relied upon to create any rights, substantive
or procedural, enforceable by any party in litigation with the United States. EPA reserves the right to act at variance with
these policies and procedures and to change them at any time without public notice.
July 1, 1998

-------
                     USE AND STRUCTURE OF THE MANUAL

    The information in this Manual is targeted to Information Management Coordinators (IMCs), Remedial Project
Managers (RPMs), and On-Scene Coordinators (OSCs), and RegionapCounsels. Its primary purpose is to provide
guidance to this audience on management of the Superfund program.    "       '/_"'..,  '.'',.

    The FY 1999 Superfund Program Implementation Manual contains information on:

•   Managers'Schedule of Significant Events;

•   Program goals and priorities;

•   Program planning and reporting requirements; and

•   Financial management.

    In addition, the appendices at the end of the manual contain pipeline specific planning and reporting definitions.

•   Appendix A presents measure definitions for Site Screening and Assessment and Regional Decisions;

•   Appendix B provides measure definitions for Early and Long Term Actions;

•   Appendix C presents measure definitions for Enforcement;

•   Appendix D contains program priorities and measure definitions for Federal Facilities;

•   Appendix E provides information on Superfund Information Systems;

*   Appendix F contains program priorities, measures, definitions, planning and reporting requirements, and financial
    information for the Oil Program; and

•   Appendix G contains Superfund Reforms Measures of Success.

•   Appendix H contains Government Performance and Results Act (GPRA) objectives, subobjectives and reporting
    measures.

•   Appendix J contains measure definitions for Community Involvement.
                                                                                          July 1, 1998

-------
                                            This Page Left
                                          Intentionally Blank
July 1, 1998

-------
                                                                    OSWER Directive 9200.3-14-1E

                    Superfund Program Implementation Manual
                                     Fiscal Year 99/00

                                     Table of Contents


MANAGERS' SCHEDULE OF SIGNIFICANT EVENTS  ....................  ................ ... Xv

ACRONYMS [[[ . ................ xxi

ORGANIZATIONAL CHARTS
                              ......... . ...... ..... .................. ..................... xxxi
    OERR ---- ................... [[[  xxxjj
    OECA [[[ xxxiii
    OSRE [[[ xxxjv

REGIONAL MAP ....................... '. .................................. ............  xxxvii


PROGRAM GOALS AND PLANNING REQUIREMENTS

CHAPTER I PROGRAM GOALS AND PRIORITIES ............................ . .............. M
    I.A Introduction .................................................. . ..................... I_l
           Superfund and its History ........ : ....................................... . ......... i_j
           Reauthorization [[[ .            j_2

    I.B Current Program Priorities , ............... ............................................. j_2
           Superfund [[[       j_2
           Protect Public Health and the Environment .......................................... . . 1-2
                      Construction Completions ............................................... I_2
                      Innovative Technologies ................................................ 1-3
                      Improving Lead Risk Assessments and Cleanup Decisions ...................... 1-4
           Lead-based Paint and Property Transfer at BRAC Installations ............................. 1-4
           Promoting a Fairer Superfund Enforcement Program ............... ...................... 1-5
                      Enforcement First/Cost Recovery ............................ . ............ 1-6
           Maximizing Program Effectiveness and Efficiency ...................................... 1-6
                      Reinventing Site Assessment ............................................. 1-6
                      Base Closures  .......... . . . . .......................................... 1-7
                      Environmental Indicators  ............................................... I_7
                            Environmental Indicators and WasteLAN ........................... 1-9
                      Effective Contract Management ..................................... ..... 1-9

           Building Superfund Partnerships  [[[ 1-10

                      Enhancement of State/Tribal Role ........................................ 1-10
                      Superfund Block Funding/EPA Performance Partnership Grants ................ I-l 1

-------
OSWER Directive 9200.3-14-1E
                    Superfund Program Implementation Manual
                                      Fiscal Year 99/00
                                     Table of Contents
CHAPTER I (cont'd)
                                               •
                      Piloting State Remedy Selection	1-13

           Encouraging a Customer Orientation	1-13

           Brownfields			1-14
                      History	.'	.'	'..'	1-14
                      Brownfields Pilots	1-14
                      Brownfields National Partnership Action Agenda	1-14
                      Tax Incentive	1-14

           oil	":...'.	 i-is

    I.C Superfund Reforms (Previously Known as Administrative Reforms)	1-15

           Risk Based Priorities for Contaminated Sites	'	1-17

           National Risk Assessment Criteria	1-17
CHAPTER II PROGRAM PLANNING AND REPORTING REQUIREMENTS
...  II-l
    II.A Introduction	  II-l
    fl.B Integrated Planning	  II-l
    II.C Introduction to the Superfund Comprehensive Accomplishment Plan (SCAP)	  II-2
    II.D Relationship of Scap to Other Management Tools	  II-3

       Management Tools	;	  II-3
       Superfund Information Systems	  II-6

    II.E Overview of the Planning Process (SCAP)			  II-6

       Planning Year	.•-•••;• •.	•	  H'6
       Operating Year	...	  II-7

    II.F Change Control Requirements	,	  II-7
    II.O HQ/Regional Roles and Responsibilities	  II-8

       Maintaining Planning/Accomplishment Data in WasteLAN	•,••••	•»,•.;	  H-8
       Program Evaluation	'.	  II-9

    II.H Procedures for Annual Target Setting	  II-l 1
    III WorkPlanning	  11-11

       Planning Process  	".	  II-l 1


July 1, 1998                                      ii

-------
                                                                      OSWER Directive 9200.3-14-1E

                     Superfurid Program Implementation Manual
                                      Fiscal Year 99/00


                                      Table of Contents


 CHAPTER II (cont'd)

        WasteLAN Reports forPlanning/Target Setting		  n-12

    II.J Regional Accomplishment Reporting  	'...:	...	  11-14

        WasteLAN Reports for Accomplishment Reporting	  H-14

.    II.K HQ Evaluation of Regional Performance	  n-15

        Mid-Year Assessment	/	  H-15
        End-of-Year Assessment	  11-16
        Regional Reviews	  11-17
        Management Reporting	  H-17

            Superfund Management Reports	  H-17
            Annual Reporting Requirements	  11-18

    ILL Target and Definition Change Requests	.1	.'. '.'.	  IJ-19

        Maintaining the Planning Estimates/Targets	,	  H-20

    II.M Special Reporting Topics	  H-20

        Brownfields	'	  H-20
        Reinventing Site Assessment	..'......  11-21
        Base Closure 	..!.................	 .  11-21

    II.N General Work Planning and Reporting Requirements	  11-21
        Data Lockout on Historical Accomplishments	  11-21
        Data Validation and Verification	;.  H-21
        Action Lead Codes	  H-22 •
        Lead Changes	:	  n-24
        Action Qualifiers for Screening and Assessment Actions  	'.	  11-25
        Record of Decision (ROD)	  11-26

!            Non-Significant Changes		 .V 11-26
            Significant Changes to a Component of a Remedy	  11-27
            Fundamental Changes to the ROD	  H-27
  •          RODs Requiring No Physical Construction	'.'..............	  11-27

        Anomalies and Phased Projects	 .  H-28
                                                iii                            '         July 1, 1998

-------
OSWER Directive 9200.3-14-1E

                    Superfund Program Implementation Manual
                                    Fiscal Year 99/00


                                    Table of Contents


CHAPTER III SUPERFUND FINANCIAL MANAGEMENT	:	III-l
THIS CHAPTER IS BEING REVISED BY HQ AND WILL BE DISTRIBUTED AT A LATER DATE

INDEX	;	A

FY 99 Response Performance Measure	  1

PROGRAM IMPLEMENTATION PROCEDURES

APPENDIX A

SITE SCREENING AND ASSESSMENT/REGIONAL DECISION
FY 99/00 TARGETS AND MEASURES	  A-l

    Reinventing Site Assessment	  A-l
    Overview of FY99/00 Site Screening and Assessment/Regional Decision Targets and Measures	  A-l
    GPRA and Site Assessment	  A-2
    Superfund Durations	  A-3
    Site Screening and Assessment/Regional Decision Definitions Brownfields Assessment 	  A-6
       Pre-CERCLIS Screening Assessments	  A-6
       Site Discovery 	  A-9
       SSA-3 • Sites Archived	  A-10
       Preliminary Assessments (PA) at Non-Federal Facility Sites	  A-l 1
       Federal Facility Preliminary Assessment Reviews	  A-13
       Site Inspections (SI) at Non-Federal Facility Sites	  A-14
       Combined PA/SI Assessments at Non-Federal Facility Sites 	  A-16
       Site Inspection Prioritizations (SIPs) at Non-Federal Facility Sites	  A-18
       Expanded Site Inspections (ESI) at Non-Federal Facility Sites	  A-20
       Federal Facility SI/ESI Reviews	  A-21
       Integrated Expanded Site Inspection/remedial Investigation (ESI/RI)	  A-23
       State Deferral	  A-24
       Hazard Ranking System Package (HRS)	  A-25
       Integrated Removal/Remedial Evaluation	  A-26
       Regional Decisions	  A-29
       Engineering Evaluation/Cost Analysis (EE/CA)	  A-29

       Support Agency Assistance	  A-30
       Technical Assistance	  A-31

       NPL Listing			..............;:..,  A.32
       Remedial Investigation (RI) Starts	.;		..  A-33
       Feasibility Study (FS) Starts  	.....:......'....,. r		  A-35
       Combined RI/FS Start			.'..'.	;	  A-36
       Start of Public Comment Period (Proposed Plan to Public)	  A-38
       RI/FS Duration	  A-38

July 1, 1998                                     iv

-------
                                                                     OSWER Directive 9200.3-14-IE
                     Superfund Program Implementation Manual
                                      Fiscal Year 99/00


                                     Table of Contents


APPENDIX A (cont'd)

       Decision Document Signed	  A-39
       ROD Amendments and Explanation of Significant Differences (ESDs)	  A-39

APPENDIX B

RESPONSE ACTION FY 99/00 TARGETS AND MEASURES	  B-1

    Overview of FY 99/00 Response Action Targets/Measures	  B-1
    Superfund Durations	  B-1
    Respond Action Definitions  	  B-5

       Engineering Evaluation/Cost Analysis (EE/CA)	  B-5
       Support Agency Assistance	  B-5
       Technical Assistance	  B-6
       Remedial Investigation (RI) Starts	  B-6
       Feasibility Study (FS) Starts	  B-8
       Combined RI/FS Start	  B-9
       Treatability Studies	  B-10
       Start of Public Comment Period (Proposed Plan to Public)	  B-11
       RI/FS Duration	  B-ll
       Decision Document Signed	  B-12
       ROD Amendments and Explanation of Significant Differences  	  B-13
       Pre-Design Assistance	  B-13
       Remedial Design (RD) Start  .,	  B-14
       RD Completion  	:	  B-15
       Remedial Action (RA) Start	  B-16
       RA Contract Award	  B-17
       Start of Response Actions/Activities	;	  B-18
       Operational and Functional (O&F)	-.	  B-22
       Long-Term Response Action (LTRA)	  B-22
       Completion of a Response Action	  B-23
       NPL Site Construction Completions	  B-26
       Operation and Maintenance (O&M)	  B-32
       NPL Site Completions	„	 B-33
       Five-Year Reviews	   B-35
       Partial NPL Deletion	_ . . B-36
       Final NPL Deletion  	 B-37
       Non-NPL Site Completion	 B-38
       Indicator A • Populations Protected	 B-38
       Indicator B • Progress Through Environmental Indicators
           (Achieving Permanent Cleanup Goals) 	 B-40
       Indicator C • Technologies Used and Volumes Handled at NPL and Non-NPL Sites	 B-41
                                                                                     July 1, 1998

-------
OSWER Directive 9200.3-14-1E
                     Superfund Program Implementation Manual
                                      Fiscal Year 99/00

                                      Table of Contents
APPENDIX C
FY 99/00 TARGETS AND MEASURES FOR BASELINE ENFORCEMENT	 C-l
    Overview	•	 C-l
   Targets and Measures For Baseline Enforcement	 C-4
        Potentially Responsible Party (PRP) Search Starts	 C-4
        PRP Search Completions	 C-4
        Section  104(e) Letters Issued	 C-5
        Receipt of Responses to Section 104(e) Letters	'...:.'....'.	 C-6
        Section  104(e) Referrals and Orders Issued	 C-6
        Issuance of General Notice Letters (GNLs)	 C-7
        Issuance of Special Notice Letters (SNLs)	 C-7
        Expanded Site Inspection/Remedial Investigation/Feasibility Study (ESI/RI/FS) Negotiation Starts  ... C-8
        Remedial Design/Remedial Action (RD/RA) Negotiation Starts	 C-8
        Completion or Termination of Negotiations for RD/RA [formerly known as RD/RA Negotiation
           Completions} .. <	 C-9
        Completion or Termination of Negotiations for Cleanup (RD/RA, Removals, and Other) [formerly
           known as Cleanup Negotiation Completions]	 .  C-10
        State Order for ESI/RI/FS	  C-12
        State Consent Decree for RD/RA	  C-12
        Total Response Commitments (Including Dollar Value) [formerly known as Total Response
           Settlements (Including Dollar Value)]	  C-13
        De Minimis Settlements and Number of Parties	  C-14
        Cash Out Settlements	  C-16
        Section 106, 106/107, 107 Case Resolution	  C-17
        Administrative Record for Selection of Response Action	i	  C-l 8
        Issuance of Demand Letter	  C-l 8
        Total Cost Recovery Settlements (Including Dollar Value)	  C-l8
        Past Costs Addressed > $200,000 Via Settlements, Write-Offs, or Referrals [formerly known as
           Past Costs Addressed > $200,000]		.. J	.....:	  C-19
        Recoverable Past Costs That Have Been Addressed by Program to Date Via Settlements,
           Write-Offs, or Referrals [formerly known as Recoverable Past Costs That Have Been
           Addressed Program to Date]	  C-21
        Number and Amount of CERCLA Penalties Assessed  	  C-22
        Number and Amount of CERCLA Supplemental Environmental Projects (SEPs)  	  C-23
        Compliance Monitoring: Noncompliance with Active Enforcement Instrument for Response and
           Enforcement Action Taken [formerly known as Noncompliance with Consent Decrees,
           Administrative  Orders on Consent, and Unilateral Administrative Orders AND formerly
           known as Noncompliance with Consent Decrees, Administrative Orders on Consent, and
            Unilateral Administrative Orders That Have Been Addressed]	  C-24

FY 99/00 TARGETS AND  MEASURES FOR ENFORCEMENT REFORMS ....  ....',.  ...  • !:      C-26
    Overview of Enforcement Reforms	..:..:.'.	:...;...................  C-26
    Definitions of Enforcement Reforms	...,....,.	  C-26
        Use of Alternative Dispute Resolution  (ADR)	',.'. .,. . .'. ............ .'. .....  C-26
        Number of Settlements Where EPA Settled Based on Ability-to-Pay Determinations ..... i .......  C-27

July  1, 1998                                     vi

-------
                                                                      OSWER Directive 9200.3-14-IE
                     Superfund Program Implementation Manual
                                      Fiscal Year 99/00

                                      Table of Contents
 APPENDIX C (cont'd)
        Prospective Purchaser Agreements (PPAs) ... ____ ........ .............. , ..............    C-28
        Issuance of Comfort/Status Letters  ...................................                    C_29
        Orphan Share - EPA Offer and Compensation ... ____ ......... ........... . . . ...... :..'.'.'.'.'.'.  C-30
        Use of Interest Bearing Special Accounts ......................... ... ...............       C_31
        Issue Cleanup Orders to Parties in an Equitable Manner . . ......................... ,           C-32
        De Micromis Settlements and Number of Parties  ................... ... ........... . .         £.33
        PRP Oversight Administration .................... .............. ............... ......'.  C-35
APPENDIX D
FEDERAL FACILITIES PRIORITIES .... ............... ...... ......... .       ...             D_i
    Overview ....... ...... .......................................... _             ......... ^ i
    Superfund Federal Facility Goals and Priorities . . . . . ............................ .............. D-l

        Strategic Federal Facility Goals  ................................. ... ..... .                 D_l
        Streamlining Federal Facilities Cleanup and Oversight ......... ... ................. ........ D-2

    RCRA Activities at Federal Facility NPL Sites ...........................  ........... ......... D_3
    BRAC Budget and Financial Guidance ............................................... '.'.'.'.'.'.'. D-3
                                                                                           f
        Resources and Tracking Mechanisms  ...............................................      D-3
        Accountability for Resources ..................................... . .         ','.'.'.'.'.'"" D-4

FACILITIES FY 99/00 TARGETS AND MEASURES  ... ............... ....... •'. ...... . ..... ... D-7

    Overview of FY 99/00 Federal Facilities Targets and Measures  . ................... . ............. D-7

        Reporting of Non-NPL Federal Facilities Data .....................................         0.7

    Federal Facilities Definitions  .............. ........ ...... ......... ,-.. . ...............        D_9

        Base Closure Decisions  . . ............. .......................... .........              £>_9
        Federal Facility Agreement (FFA)/Interagency Agreement (TAG) Starts  ____ .......  . ......... '.','.  D-9
        FFA/IAG Completion  ....................................... ..............           D-10
        Federal Facility Dispute Resolution ...... ......... . . ....... - ...................... .......  D-10
        Use of Supplemental Environmental Projects (SEPs)  , ................ .................. . . ]  D-! 1
        Remedial Investigation/Feasibility Study (RI/FS) or RCRA Facility               ..........
    .   Investigation (RFI) Starts ...... . ....... ...........................................     D-! j
       Feasibility Study (FS), Corrective Measure Study (CMS), or EE/CA Starts . . ............ ____ . . .  D-12
       Decision Documents ............ , ........... .  ..................                       D-12
    :   Duration of ROD to IAG Negotiation Completion  ____ . ............. ____ . , ....... -....'.'.'.'.'.  D-13
    .   Remedial Action (RA) or RCRA  Corrective Measure Implementation (CMI) Starts ..... . . .......  D-13


                                              vii                                     July 1, 1998

-------
OSWER Directive 9200.3-14-1E
                    Superfund Program Implementation Manual
                                     Fiscal Year 99/00

                                     Table of Contents
APPENDIX D (cont'd)

       Timespan from ROD Signature to RA Start	  D-14
       RA or CMI Completions	  D-14
       Removal or RCRA Interim/Stabilization Measure (ISM) — Starts and Completions	  D-15
       NPL Site Construction Completions 	  D-16
       Federal Facility Five-Year Reviews	  D-22
       Federal Facility Partial NPL Deletion 	  D-22
       Federal Facility Final NPL Deletion 	  D-23

Community Involvement Definitions	  D-27

       Community Involvement Plan	  D-27
       Information Repository  	  D-27
       Public Meeting	  D-28
       Restoration Advisory Boards/Site-Specific Advisory Boards (RABs/SSABs)  	  D-28
       Technical Assistance Grants (TAGs)	  D-29
       Technical Outreach Services for Communities (TOSC) 	  D-29
APPENDIX E

SUPERFUND INFORMATION SYSTEMS	E-1
    The Purpose of WasteLAN	E-1
        Site Assessment	:	•	E-1
        Risk Assessment	E-2
        Remedy Selection  	E-2
        Federal Facilities  ....'	E-2
        Community Involvement	E-3
        Removal	•	E-3
        Enforcement	-	• • •  •, E-3
        Project Management  	E-4
        Program Management 	E-4

    Superfund Data Architecture	E-4

    Reporting Superfund Information	E-6
        WasteLAN Users	E-7

    Applicability of the Freedom of Information Act	• • • •	E-7
        Reports Releasable under Freedom of Information Act (FOIA)	.,..:... E-7
        Sensitive Information Not Releasable under FOIA	•	•	E-7
        Ad Hoc Reporting 	,	• •	.•••••.	E-10
        Accessing FOIA Information	.............	E-11

    Data Owners/Sponsorship	E-12


July 1,1998                                     viii

-------
                                                                   OSWER Directive 9200.3-14-1E
                    Superfund Program Implementation Manual
                                     Fiscal Year 99/00

                                     Table of Contents
APPENDIX F
OIL POLLUTION PREVENTION AND RESPONSE PROGRAM PRIORITIES	F-l
    Overview	 F-l

    Oil Program Initiatives	p_l
       Addressing Above-Ground Storage Facility (ASF) Leakage and Contamination  	F-l
       Implementing FRPs	;	;	F-l
       Implementing the NCP	F-2
       Developing and Maintaining Data Systems	F_3
       Improving the SPCC Program	F-3
       Coordinating with Other Agencies	F-4

    Oil Spill Prevention and Cleanup Activities		F-4

OIL POLLUTION PREVENTION AND RESPONSE PROGRAM PLANNING AND
REPORTING REQUIREMENTS 	  		F-5
    Overview	  	F-5
    National Oil and Hazardous Substances Pollution Contingency Plan	F-5
    Regional Contingency Plans	F-5
    Area Contingency Plans	'. p-5
    Federal Response Plan	F-6
    Communications Requirements Associated with a Release	 F-7

OIL POLLUTION PREVENTION AND RESPONSE PROGRAM FINANCIAL MANAGEMENT	F-8
    Overview	.....:	    F-8
    Budget Formulation	F-8
    Operating Plan Development	F-8
    Budget Execution		p.g

OIL POLLUTION PREVENTION AND RESPONSE PROGRAM FY 99/00 MEASURES	F-l 1
    Overview	_           p.| ]

OIL POLLUTION PREVENTION AND RESPONSE PROGRAM DEFINITIONS	F-l2
    Prevention/Preparedness Measures:  	F-12
       Spill Prevention, Control, and Countermeasure (SPCC) Inspections and Plan Reviews	F-12
       Spill Prevention, Control, and Countermeasure (SPCC) Facilities in Compliance  ..'.-/	F-12
       Oil Facility Response Plans Reviewed and Approved	F-13
       Area Contingency Plans	;	p_i3
       Preparedness for Response Exercise Program (PREP) Area Drills	:.... F-14
    Response Measures	p_i4
       Oil Spill Notifications	p_i4
       Oil Spill Investigations/Preliminary Assessments 	F-15
       Oil Spill Cleanups	p_15
       Oil Spill Monitoring/Directing	p.jg
       Cost Documentation	F-16


                                              ix                                    July 1, 19*98

-------
OSWER Directive 9200.3-14-1E
                   Superfimd Program Implementation Manual
                                   Fiscal Year 99/00

                                   Table of Contents
   APPENDIX F (cont'd)

   Enforcement Measures 	F-17
       Administrative Penalty Enforcement Actions for Spill Violations and Prevention Regulation
       Violations	F-17
       Judicial Penalty Enforcement Actions for Spill Violations and Prevention Regulation Violations	F-17
       Orders for Removal Issued to a Responsible Party	,	F-17
APPENDIX G

SUPERFUND REFORMS MEASURES OF SUCCESS (OERR & OSRE)	  G-l


APPENDIX H

EPA'S MISSION, GOALS, AND PRINCIPLES	  H-1

GOVERNMENT PERFORMANCE AND RESULTS ACT (GPRA) OF 1993	  H-1
    Strategic Plan Requirements	  H-2
       Comprehensive Mission Statement  	  H-3
       General Goals and Objectives	.,  H-3
       Description of How General Goals and Objectives Will Be Achieved	  H-3
       Relationship Between Goals in the Annual Performance Plan and in a Strategic Plan  	  H-3
       Key Factors Affecting Achievement of General Goals and Objectives	  H-4
       Program Evaluations	'..  H-4
    Annual Performance Plan	  H-4
       Performance Goals	  H-4
       Resources	  H-4
       Performance Indicators 	  H-4
       Verification and Validation	  H-5
    Program Performance Reports 	  H-5

GPRA GOALS, OBJECTIVES, SUBOBJECTIVES STRUCTURE 	  H-7


APPENDIX J

J.A FY 99/00 SCAP TARGETS AND MEASURES	J-l

    J.A.I  Overview of FY 99/00 Community Involvement Targets/Measures  	J-l
    J.A.2  Community Involvement Plan  	J-2
    J.A.3  Information Repository	J-3
July 1, 1998

-------
                                                                     OSWER Directive 9206:3'-14-1E'
                     Superftmd Program Implementation Manual
                                     Fiscal Year 99/00


                                     Table of Contents


APPENDIX J (cont'd )

    J.A.4 Public Meeting	..	 J-3
    J.A.5 Community Advisory Groups/Restoration Advisory Boards/
         Site-Specific Advisory Boards (CAGs/RABs/SSABs)		J-3
    J.A.6 Technical Assistance Grants (TAGs)		.		''..'...'...	        J-4
    J.A.7 Technical Outreach Services for Communities (TOSC)		.		j_5

J.B CIOC DATA SPONSOR RESPONSIBILITIES	j_5

    J.B.I Role of CIOC as a Data Sponsor		j_5
    J.B.2 National Program Requirements and the Data Sponsor Role		,		.,,. J-6

               Program Goals and Objectives	:	j_6
               Statutory Mandates  	.. j.g
               Regulatory and Policy Requirements	j_6
               Superfund Reforms  	,	...:.. ......	        ;    J-12
               Government Performance and Results Act (GPRA)	J-12
               Reauthorization, Congressional Inquiries and Audits ........	;..,.....-.,.:...... J-13

    J.B.3 CIOC Headquarters and Regional Organization	J-13
    J.B.4 Timeline  	,	~	          j_j4
    J.B.5 Program Monitoring and Reporting	             ;    J-16

               Data Quality	;    j-16
               Management Reports	 J-17
               Coding Guidance	,	;;  j.\j
               Modifications (Since Last Update)	 J-17
                                                                                    July 1, 1998

-------
OSWER Directive 9200.3-14-1E

                 Superfund Program Implementation Manual
                                Fiscal Year 99/00


                                 List of Exhibits


PROGRAM GOALS AND PLANNING REQUIREMENTS

CHAPTER II

EXHIBIT III FLEXIBILITY SCALE FOR BUDGETING/PLANNING	  II-4

EXHIBIT II.2 HQ/REGIONAL INTEGRATED PLANNING RESPONSIBILITIES	  II-5

EXHIBIT II.3 HQ/REGIONAL SCAP AND WasteLAN RESPONSIBILITIES .		  II-8

EXHIBIT II.4 EVALUATION RESPONSIBILITIES	  11-10

EXHIBITII.5 PROCEDURES FOR ANNUAL TARGET SETTING  	  11-13

EXHIBIT II.6 SCAP PLANNING/TARGET SETTING WasteLAN REPORTS 	  11-14

EXHIBIT II.7 PROGRAM EVALUATION WasteLAN REPORTS	  11-15

EXHIBIT II.8 THE REGIONAL EVALUATION PROCESS	  11-16

EXHIBIT II.9CFO PERFORMANCE MEASURES	  H-19

EXHIBIT II. 10 ACTION LEAD CODES IN WasteLAN	:	  11-23

EXHIBITII.il CODING OF TAKEOVERS 	  11-25

EXHIBIT 11.12 REMEDIAL EVENTS, ANOMALIES, AND PROJECT PHASING	  11-29


CHAPTER III

THIS CHAPTER IS BEING REVIEWED BY HQ AND WILL BE DISTRIBUTED AT A LATER DATE


PROGRAM IMPLEMENTATION PROCEDURES

APPENDIX A

EXHIBIT A.1 SITE SCREENING AND ASSESSMENT/REGIONAL DECISION ACTIVITIES ...'..'	  A-3

EXHIBIT A.2 SITE SCREENING AND ASSESSMENT/REGIONAL-     '     ':        '
      DECISION PLANNING REQUIREMENTS  	 A-41
July 1, 1998                               xii

-------
                                                         OSWER Directive 9200.3-14-1E

                 Superfund Program Implementation Manual
                               Fiscal Year 99/00


                                List of Exhibits


APPENDIX B

EXHIBIT B.I RESPONSE ACTION ACTIVITIES	 B-3

EXHIBIT B.2 LONG-TERM ACTION FLOW CHARTS	 B-42

EXHIBIT B.2 LONG-TERM ACTION FLOW CHARTS (continued)	 B-43

EXHIBIT B.3 RESPONSE ACTION PLANNING REQUIREMENTS 	 B-44


APPENDIX C

EXHIBIT C.I ENFORCEMENT ACTIVITIES 	 C-2

EXHIBIT C.2 ENFORCEMENT PLANNING REQUIREMENTS	 C-37


APPENDIX D

EXHIBIT D.I FEDERAL FACILITIES ACTIVITIES	 D-8

EXHIBIT D.2 FEDERAL FACILITIES PLANNING REQUIREMENTS	 •	 D-25

APPENDIX E

EXHIBIT E.I SUPERFUND DATA ARCHITECTURE	E-5

APPENDIX F

EXHIBIT F.I RELATIONSHIP OF OIL POLLUTION PREVENTION AND
RESPONSE PROGRAM PLANS	:.	F-6

EXHIBIT F.2 FY 98 OIL POLLUTION PREVENTION AND RESPONSE PROGRAM ACTIONS	F-l 1


APPENDIX J

EXHIBIT J.I .COMMUNITY INVOLVEMENT ACTIVITIES	J-2

EXHIBIT J.2 COMMUNITY INVOLVEMENT REQUIREMENTS	J-7

EXHIBIT J.3 CIOC HQ AND REGIONAL ROLES AND RESPONSIBILITIES	J-14
                                       xiii                              July 1, 1998

-------
                                             This Page Left
                                          Intentionally Blank
July 1, 1998

-------
                                           OSWER Directive 9200.3-14-1E
Superfund/Oil Program Implementation Manual FY 99/00
        Managers' Schedule of Significant Events
                                                       July 1, 1998

-------
OSWER Directive 9200.3-14-1E
             MANAGERS' SCHEDULE OF SIGNIFICANT EVENTS

           This schedule has been revised from previous versions to reflect the implementation of the new
           generation of WasteLAN. Data on program accomplishments is no longer pulled on the 5th
           working day of the month; the dates shown are key pull dates for Advice of Allowance issuance and
           planning dates.

           OCTOBER 1998 QUARTER 1 (FY 99)

     3*    The AAs and OC approve the first and second quarter AOA

     7     HQ pulls national Environment Indicators (El) data from WasteLAN

     7     HQ pulls 4th Quarter FY 98 accomplishment data from WasteLAN and provides for:
           1) Special program reports; and
           2) Initial FY 98 end-of-year Program Assessment

     24    HQ pulls 4th quarter FY 98 accomplishment data from WasteLAN for review of end of year
           accomplishments

           NOVEMBER 1998

     4-6    HQ/Regional Superfund Focus Forum Meeting

     14    OMB passback of FY 00 budget request

           DECEMBER 1998

     15    HQ appeal of the OMB FY 00 budget passback

           JANUARY  1999 QUARTER 2 (FY 99)

     8     HQ pulls 1st Quarter FY 99 accomplishments data from WasteLAN and provides for special
           program reports.

     8     Enforcement provides:
           1) Special program reports; and
           2) First quarter performance evaluations

     9     HQ submits FY 00 budget request to the President
   * Dependent on approval of final appropriations.
July 1, 1998                                    xvi

-------
                                                                    OSWER Directive 9200.3-14-IE
        FEBRUARY 1999

 20     HQ distributes FY 98 El analysis to HQ/Regional managers

        MARCH 1999

  6     HQ pulls data from WasteLAN for 3rd quarter AOA for FY 99

 24     HQ submits 3rd quarter AOA request to the AA/SWER and places it in WasteLAN

 31     Regions input AOA to IFMS                                   .   .           .        •.

        APRIL  1999 QUARTER 3 (FY 99)

  3     The AAs and OC approve the 3rd quarter AOA

  6     HQ pulls accomplishment data from WasteLAN and provides for:
        1) Special  program reports; and
        2) Mid-Year Work Planning evaluation

  7     HQ pulls national Environmental Indicators (El) data from CERCLIS

        MAY 1999

  6     HQ analysis of Regional pipeline (upcoming year and one year out) and historical performance
        trends

  6     HQ allocates preliminary FY 00 budget to Regions

  12     HQ program offices characterize and submit their FY 00 program initiatives

 25     HQ prepares preliminary Regional FY 00 operating plan based on projected budgets in WasteLAN

 29     HQ program offices meet with the Administrator to review FY 00 program goals

        JUNE 1999

1-26     Regions generate their plans for FY 00 by ensuring updated schedules and financial information in
        WasteLAN        ........                                        ..... ..'...   	

  5     HQ pulls planning information from WasteLAN:
        1) for fourth quarter AOA; and
        2) to support FYOO  and FY 01 budget request

  5     HQ pulls financial data for analysis of Regional obligation/commitment rates


                                             xvii            '                         July 1, 1998

-------
 OSWER Directive 9200.3-14-IE
            JUNE 1999(contd)

      8     HQ presents FY 00 Superfund goals and priorities and FY 01 investments to the Administrator and
            Regional Administrators

      12    Administrator and OC provide HQ program offices and Regions with policy for FY 01 budget
            formulation

      22    HQ submits 4th quarter AOA request to the AAs and places it in WasteLAN

      29    Regions input AOA to IFMS

            JULY 1999 QUARTER 4 (FY 99)

      2     The AAs and OC approve the fourth quarter AOA

      8     HQ pulls 3rd Quarter FY 99 accomplishments data from WasteLAN and provides for special
            program reports                         ;

      8     Enforcement provides:
            1) Special program reports; and
            2) Third quarter performance evaluations

      8     HQ submits FY 01 Superfund investment summaries to the Administrator and Budget to OC

      8     HQ pulls data from WsateLAN to review and analyze:
            1) GPRA accomplishments, internal measures, pipeline workload and FY 00 budget request;
            2) Past Regional accomplishments and planned durations/dollars; and
            3) Regional request for FY 00 budget reserve
                   i
    13-17   HQ program offices and lead Regions make presentation to Administrative/Deputy Administrator
            on FY 01 program priorities

    20-24   Regional conference call on HQ analyses

      31     Administrator passback of FY 01 budget request

            AUGUST 1999

    3-18    HQ develops FY 01 budget for submission to the Office of Management and Budget (OMB)

      7     HQ pulls WasteLAN data to assist in preparation of the FY 01 budget

      28     HQ develops strategy for presenting the FY 01 budget to OMB

      28     HQ sends memorandum to Regions on final budgets and GPRA targets/annual performance.goals i,.
            and internal measures
July 1, 1998                                      xviii

-------
                                                                     OSWER Directive 9200.3-14-JE
          SEPTEMBER 1999

    4     HQ submits FY 01 budget to OMB

    8     Regions revise WasteLAN to reflect final negotiated budgets and targets and measures

    8     HQ pulls data from WasteLAN for first quarter FY 00 AOA               -  ,, .,  .

   9-20   HQ/Regions conduct work planning sessions on the final FY 00 GPRA targets/annual performance
          goals and internal measures and budget

    15     HQ performs final FY 00 Full Time Equivalent (FTE) distribution

    21    HQ submits FY 00 first quarter AOA request to the AAs and places it in WasteLAN

   29*   Regions input AOA to IFMS


          OCTOBER 1999OUARTER 1 (FY 00)

    2*    The AAs and OC approve the Island 2nd quarter AOA

    6     HQ pulls 4th quarter FY 99 accomplishment data from WasteLAN and provides for:
          1) Special program reports; and
          2) Initial FY 99 erid-of-year Program assessment

    20    HQ pulls 4th quarter FY 99 accomplishment data from WasteLAN for review of end of year
          accomplishments                       '

    20    HQ pulls national Environment Indicator data from WasteLAN

          NOVEMBER 1999

    18    OMB passback of FY 01 budget request                .

          DECEMBER 1999                                               t

    7     HQ pulls WasteLAN data for 2nd quarter AOA                   ,,=..,

    14    HQ appeal of the OMB  FY 01 budget passback

    21    HQ submits 2nd quarter AOA request to AAs and places it in WasteLAN            ,

    28    Regions input AOA to IFMS
'Dependent on approval of final appropriations.
                                              xix                                     July 1, 1998

-------
OSWER Directive 9200.3-14-lE
                                            This Page Left
                                          Intentionally Blank
July 1, 1998

-------
                       OSWER Directive 9200.3-14-IE
Acronyms
                                       July 1, 1998

-------
  OSWER Directive 9200.3-14-IE
                                             This Page Left
                                           Intentionally Blank
July 1, 1998

-------
                                                                       OSWER Directive 920O:3-14-1E
AA —
AAOE —
AASWER—  '
AAOECA —
AAU —
AC —
ACP —
ADCR —
ADR —
AHRC —
AN —
AO —
AOA —
AOC —
AOG —
AR —
ARAR —
ARCS —
ARIP —
ARM —
ASF —
AST —
ASTM —
ASTSWMO —
ASTW —
ASU —
ATSDR —
ATSDR HAZDAT -
BC/AOA —
BLM —
BRAC —
BTAG —
BUREC —
CA —
CADD —
CAS No. —
CBD —
CD —
CEPP —
CEPPO —
CERCLA —
CERCLIS —

CERFA —
CFO —
CIAO —
CIOC —
CLP —
CN —
CO —
COI —
 CPCA —
 CR —
 CRCR —
Assistant Administrator
Assistant Administrator for the Office of Enforcement  ,
Assistant Administrator for the Office of Solid Waste and Emergency Response
Assistant Administrator for the Office of Enforcement and Compliance Assurance
Administrative Assistance Unit
Area Committee
Area Contingency Plan
Automated Document Control Register
Alternative Dispute Resolution
Allowance Holder/Responsibility Center
Account Number
Administrative Order
Advice of Allowance
Administrative Order on Consent
Agency Operating Guidance     •'•"••'
Administrative Record
Applicable or Relevant and Appropriate Requirements
Alternative Remedial Contracting Strategy
Accidental Release Information Program
Administration and Resources Management
Above-ground Storage Facility
Above-ground Storage Tank
American Society for Testing and Materials
Association of State and Tribal Solid Waste Management Organizations
Above-ground Storage Tank Workgroup
Administrative Support Unit
Agency for Toxic Substances and Diseases Registry
Agency for Toxic Substances and Diseases Registry Hazardous Data System
Budget Control/Advice of Allowance
Bureau of Land Management
Base Realignment or Closure
Biological Technical Assistance Group
Bureau of Reclamation
Cooperative Agreement
Corrective Action Decision Document
Chemical Abstract Number
Commerce Business Daily
Consent Decree
Chemical Emergency Preparedness and Prevention Program
Chemical Emergency Preparedness and Prevention Office (OSWER)
Comprehensive Environmental Response, Compensation, and Liability Act of 1980
Comprehensive Environmental Response, Compensation, and Liability Information
System
Community Environmental Response Facilitation Act
Chief Financial Officer
Citizen Information and Access Offices
Community Involvement & Outreach Center (OERR)
Contract Laboratory Program
Commitment Notice
Contracting Officer
Conflict of Interest
Core Program Cooperative Agreement
Community Relations
Cost Recovery Category Report
                                                xxm
                                                                  July 1, 1998

-------
 OSWER Directive 9200.3-14-1E
 CRP —
 CWA —
 CWG —
 DA —
 DAS —
 DCN —
 DNAPL —
 DOD —
 DoD —
 DOE —
 DOI —
 DOJ —
 DOT —
 DPO —
 DRG —
 BBS —
 EE/CA —
 El —
 EMSL —
 ENRD —
 EPA —
 EPA-ACH -
 EPA ID —
 EPCRA —
 EPI —
 EPIC —
 EPS —
 ERA —
 ERGS —
 ERNS —
 ERRS —
 ERT —
 ESAT —
 BSD —
 ESF —
 ESI —
 ESI/RI —
 ESS —
 FCO —
 FE —
 FEMA —
 FFA —
 FFCA —
 FFEO —
 FFRRO—
 FFIS —
 FFS —
 FINDS —
 FMC-Ci—
 FMD —
 FMFIA —
 FMO —
 FOIA —
 FOSL —

July 1, 1998
 Community Relations Plan
 Clean Water Act
 Community Work Groups
 Deputy Administrator
 Delivery of Analytical Services
 Document Control Number
 Dense Non-Aqueous Phase Liquids
 Deputy Office Director
 Department of Defense
 Department of Energy
 Department of the Interior
 Department of Justice
 Department of Transportation
 Deputy Project Officer
 District Response Group
 Environmental Baseline Survey
 Engineering Evaluation/Cost Analysis
 Environmental Indicators
 Environmental Monitoring Systems Laboratory
 Environment and Natural Resources Division (DOJ)
 Environmental Protection Agency
 EPA Automated Clearing House
 EPA Identification Number
 Emergency Planning and Community Right to Know Act of 1986
 Environmental Priorities Initiative
 Environmental Photographic Interpretation Center
 Environmental Protection Specialist
 Expedited Response Action
 Emergency Response Cleanup Services
 Emergency Response Notification System
 Emergency and Rapid Response Services
 Environmental Response Team
 Environmental Services Assistance Team
 Explanation of Significant Differences
 Emergency Support Function
 Expanded Site Inspection
 Expanded Site Inspection/Remedial Investigation
 Enforcement Support Services
 Funds Certifying Officer
 Federal Enforcement
 Federal Emergency Management Agency
 Federal Facility Agreement
 Federal Facility Compliance Agreement
 Federal Facilities Enforcement Office
 Federal Facilities Restoration and Reuse Office
 Federal Facilities Information System
 Focused Feasibility Study
 Facility Index  System
Financial Management Center - Cincinnati
Financial Management Division
Federal Managers Financial Integrity Act
Financial Management Office
Freedom of Information Act
Finding of Suitability to Lease
                                                xxiv

-------
                                                                       OSWER Directive 9200.3-14-IE
FOST-
ER-
ER?—
FS —
FTE —
FUDS —
FY —
FY/Q —
GAD —
GAO —
GFO —
GIGS —
GIS —
GNL —
GPRA —
HAZDAT —
HHS —
HI —
HQ —
HRS —
HSWA —
HWC —
IAG —
IFMS —
IG —
IMC —
IMPM —
IMS —
IOTV —
LAN —
LEPC —
LERP —
LOG —
LOE —
LTCS —
LTRA —
MARS —
MBO —
MM/DDA'Y -
MMS —
MOA —
MOHR  —
MORR —
MOD —
MSCA —
NAPL-
NBAR —
NCP	

NEEPPS —
NFRAP —
NOAA —
NPL —
NPM —
Finding of Suitability to Transfer
Federal Register
Facility Response Plan
Feasibility Study
Full-time Equivalent
Formerly Used Defense Sites
Fiscal Year
Fiscal Year/Quarter
Grants Administration Division
Government Accounting Office
Good Faith Offer
Grants Information Control System
Geographic Information System
General Notice Letter
Government Performance and Results Act
Hazardous Data System
Health and Human Services
Hazard Index
Headquarters
Hazard Ranking System
Hazardous and Solid Waste Amendments
Hazardous Waste Collection
Interagency Agreement
Integrated Financial Management System
Inspector General
Information Management Coordinator
Information Management/Program Measurement Center (OERR)
Integrated Management Strategy
Interoffice Transfer Voucher
Local Area Network
Local Emergency Planning Committee
Local Emergency Response Plan
Letter of Credit
Level of Effort
Long Term Contracting Strategy
Long Term Response Action
Management and Accounting Reporting System
Management by Objectives
Month/Day/Year
Minerals Management Service                 '      *
Memorandum of Agreement
Magnitude of Hazard Reduction
Magnitude of Risk Reduction
Memorandum of Understanding
Multi-Site Cooperative Agreement
Non-Aqueous Phase Liquid
Non-Binding Allocation of Responsibility
National Oil and Hazardous Substances Pollution Contingency
Plan or National Contingency Plan
National Environment Performance Partnership System
No Further Remedial Action Planned
National Oceanic and Atmospheric Administration
National Priorities List
National Program Manager
                                                 xxv
                                                                  July 1, 1998

-------
 OSWER Directive 9200.3-14-IE
 NRC —
 NRS —
 NRT —
 NSEP —
 NSFCC —
 NTC —
 NTIS —
 OAM —
 OARM —
 OC —
 OD —
 OE —
 OECA —
 OERR —
 O&F —
 OFFE —
 DIG —
 O&M —
 OMB —
 OPA —
 OPAC —
 OPC —
 OPPE —
 OPRP —
 ORC —
 ORD —
 OSC —
 OSPS —
 OSRE —
 OSW —
 OSWER —
 OU —
 OUST —
 PA —
 PAH —
 PARM —
   	
 PCB —
 PECB —
 PNRS —
 PO —
 POD —
 POLREP —
 POS —
 PPED —
 PPG —
 PQOP —
 PR —
 PPA —
 PREP —
 PRP —
 PRSC —
 PSO —
 QA-
 National Response Center
 National Response System
 National Response Team
 National Security Emergency Preparedness
 National Strike Force Communication Center
 Non-Time Critical
 National Technical Information Services
 Office of Acquisition Management
 Office of Administration and Resources Management
 Office of the Comptroller
 Office Director
 Office of Enforcement
 Office of Enforcement and Compliance Assurance
 Office of Emergency and Remedial Response (OSWER)
 Operational and Functional
 Office of Federal Facilities Enforcement (OE)
 Office of the Inspector General
 Operation and Maintenance
 Office of Management and Budget
 Oil Pollution Act of 1990
 On-line Payment and Collections
 Oil Program Center
 Office of Policy, Planning, and Evaluation
 Oil Pollution Response & Prevention Center (OERR)
 Office of Regional Counsel
 Office of Research and Development
 On-Scene Coordinator
 Outreach/Special Project Staff (OSWER)
 Office of Site Remediation and Enforcement
 Office of Solid Waste
 Office of Solid Waste and Emergency Response
 Operable Unit
 Office of Underground Storage Tanks (OSWER)
 Preliminary Assessment
 Polyaromatic Hydrocarbons
 Policy Analysis & Resources Management Center (OERR)
 Personal Computer
 Polychlorinated biphenyl
 Program Evaluation & Compliance Branch (OSRE)
 Preliminary Natural Resource Surveys
 Project Officer
 Program Operations Division (OFFE)
 Pollution Report
 Program Operations Staff (OSRE)
 Program Policy & Evaluation Division (OSRE)
 Performance Partnership Grants
 Pre-Qualified Officers Procurement
 Procurement Request
 Prospective Purchaser Agreement
Preparedness Response Exercise Program
Potentially Responsible Party
Post Removal Site Controls
Program Support Office
Quality Assurance
July 1, 1998
                        XXVI

-------
                                                                       OSWER Directive 9200.3-14-1E
QAPP —
QAT —
RA —
RAC —
RADS —
RAGS —
RCMS —
RCP —
RCRA —
RCRC —
RD —
RDT —
REMT —
RESAT —
RFP —
RI —
RI/FS —
RME —
ROC —
ROD —
RPM —
RPO —
RRT —
RTF—   .
SACA —
SACM—
SAM —
SARA —
SAS —
SB/RTC —
SCAP —
SCORES —
SEP —
SERC —
SERF —
SFO —
SI —
SIBAC —
SIP —
SITE —
SMOA —
SMP —
SMSA —
SNAP —
SNL —
SOL —
SOW —
SPCC —
SRA —
SRIS —
SSA —
SSAB —
SSC —
S/S ID —
Quality Assurance Project Plan
Quality Action Team
Remedial Action
Response Action Contract
Risk Assessment Data System
Risk Assessment Guidance for Superfund
Removal Cost Management System
Regional Contingency Plan
Resource Conservation and Recovery Act
Regional Cost Recovery Coordinator
Remedial Design
Regional Decision Team
Regional Emergency Preparedness Team
Regional Environmental Services Assistance Team
Request for Proposal
Remedial Investigation
Remedial Investigation and Feasibility Study
Reasonable Maximum Exposure
Remedial Oversight Contract
Record of Decision
Remedial Project Manager
Regional Project Officer
Regional Response Team
Research Triangle Park
Site Assessment Cooperative Agreement
Superfund Accelerated Cleanup Model
Site Assessment Manager
Superfund Amendments and Reauthorization Act of 1986
Special Analytical Services
Statement of Basis/Response to Comments
Superfund Comprehensive Accomplishments Plan
Superfund Cost Organization and Recovery Enhancement System
Supplemental Environmental Project
State Emergency Response Commission
State Emergency Response Plan
Servicing Finance Office
Site Inspection
Simplified Interagency Billing and Collection
Site Inspection Prioritization
Superfund Innovative Technology Evaluation
State Memorandum of Agreement
Site Management Plan
Standard Metropolitan Statistical Area
Superfund National Assessment Program
Special Notice Letter
Statute of Limitations
Statement of Work
Spill Prevention Control and Countermeasure
Superfund Reform Act
Superfund Report Information System
Site Screening and Assessment
Site Specific Advisory Board
Superfund State Contracts
Site/Spill Identification Number
                                               xxvn
                                                                 July 1, 1998

-------
OSWER Directive 9200.3-14-1E
SSP —
START —
STSI —
TAG —
TAT-
TED—
TDD —
TSCA —
TQM —
TRC —
TRW —
TSD —
UAO —
USCG —
USAGE —
USFWS —
USGS —
VRP —
WA —
WAM —
WasteLAN —
ZPO —
Site Safety Plan
Superfund Technical Assistance and Response Team
State, Tribal, & Site Identification Center (OERR)
Technical Assistance Grants
Technical Assistance Team
To Be Determined
Technical Direction Document
Toxic .Substances Control Act
Total Quality Management
Technical Review Committee
Technical Review Workgroup
Treatment, Storage, Disposal Facility
Unilateral Administrative Order
United States Coast Guard
U.S. Army Corps of Engineers
United States Fish and Wildlife Service
United States Geological Survey
Vessel Response Plan
Work Assignment
Work Assignment Manager
CERCLA Information System
Zone Project Officer
July 1, 1998
                        XXVlll

-------
                               OSWER Directive 9200.3-14-lE
Organizational Charts
                                               July 1, 1998

-------
OSWER Directive 9200.3-14-lE
                                            This Page Left
                                          Intentionally Blank
July 1, 1998

-------
                    Office of Solid Waste and Emergency Response
               Technology Innovation
                      Office
               Chemical Emergency
                Preparedness and
                 Prevention Office
            Office of Program
             Management
           Office of the Assistant
          Administrator (AA, DAA,
            DAA, Ombudsman,
         Superfund Reauthorization)
 Office of Emergency
   and Remedial
	Response
                Federal Facilities
             Restoration and Reuse
                    Office
                                      Outreach and Special
                                          Projects Staff
  Office of
 Underground
Storage Tanks
                                                                                 1
Office of Solid
   Waste
                                                                                                     O
                                                                                                     on
                                                                                                     3
                                                                                                     cn

                                                                                                     CO
                                                                                                     vo
                                                                                                    p
                                                                                                    OJ
vo
oo


-------
e
<<*
VD
VO
CO
                                                                        U.S.  EPA
                                           Office  of Emergency and  Remedial Response

                                                                                                               Region 4/10
                                                                                                         Accelerated Response Center
                                                                                                          John Cunningham 603-8708
                  Director Stephen Luftig
                  Deputy Director:  Larry Reed
                  Deputy Director:  Elaine Da vies
                  Special Assistant Jan Baker
                               Gershon Bergeisen
                  Attorney-Advisor: Phyllis Anderson
Superfund Reform Advocate: William ROSJ
Risk: David Bennett
Response Decision: Bruce Means
Pipeline Integration: John Smith
Emergency Response: Mark Mjoness
603-8798
603-8759
603-8815
603-8802
603-8727

-------
                    Office of Enforcement and Compliance Assurance
X
X
X
                     Administration and
                   Resource Management
                      Support Staff
                   Enforcement Capacity
                    and Outreach Office
Assistant Administrator for
     Enforcement and
  Compliance Assurance
                   Office of
                  Compliance
  Office of
  Federal
  Activities
                     Federal Facilities
                     Enforcement Office
                                                                               Planning Prevention
                                                                               and Compliance Staff
                                   Site Remediation and I
                                    Enforcement Staff
  National
Enforcement
Investigations
  Center
Office of Site
Remediation
Enforcement
                                                                                                             q
                                                                                                             '§'
                                                                                                             o
t-H
c
                                                                                                             ts3
VO
vo
oo
                                                                                                             w

-------
      Office of Site Remediation Enforcement
                                                                                             en
                                                                                             70
                                                                                             D
                                                                                         a
                                                                                         vo
                                                                                         to
                                                                                         o
                                                                                         p

Regional Support Division


Office of Site Remediation
Enforcement




Regions 1, 2,6 & 9
    Branch
Regions 5,7, & 10
    Branch
 Regions 3,4, & 8
    Branch
                                   Program Evaluation
                                    and Coordination
                                        Branch
                                       Program Evaluation
                                            Team
                                  Program Coordination
                                        Team
                                     Remediation
                                     Enforcement
                                   Management Team
                                                          Policy and Program
                                                          Evaluation Division
Policy and Guidance
     Branch
                                                             Policy and Guidance
                                                              Development Team
                                                                   Policy Integration
                                                                       Team

-------
                          OSWER Directive 9200.3-14-lE
Regional Map
                                          July 1, 1998

-------
OSWER Directive 9200.3-14-lE
                                          This Page Intentionally
                                               Left Blank

-------
                        OSWER Directive 9200.3-14-lE
XXXVll
                                         July 1, 1998

-------
OSWER Directive 9200.3-14-lE
                                              This Page Left
                                            Intentionally Blank
July 1, 1998

-------
                                      OSWER Directive 9200.3-14-1E
Program Goals and Planning Requirements
                                                   July 1, 1998

-------
OSWER Directive 9200.3-14-lE
                                        This Page Intentionally
                                              Left Blank
July 1, 1998

-------
                                          OSWER Directive 9200.3-rl4-lE
Superfund/Oil Program Implementation Manual FY 99/00




        Chapter I:  Program Goals and Priorities
                                                       My 1, 1998

-------
 OSWER Directive 9200.3-14-lE
                                        This Page Intentionally
                                              Left Blank
July 1, 1998

-------
                                                                         OSWER Directive 9200.3-14-1E.

                                              Chapter I
                                  Program Goals and Priorities

                                         Table of Contents

CHAPTER I PROGRAM GOALS AND PRIORITIES ........................................... I_l

        LA  Introduction ......................................... ...........                    j.j
                Superfund and its History ....................................... ............... j.j
                Reauthorization  ............................ ...............................    j_2

        I.B  Current Program Priorities  [[[ j_2
                Superfund [[[ j_2
                       Protect Public Health and the Environment .................................. 1-2
                               Construction Completions ........................................ I_2
                               Innovative Technologies  ......................................... 1-3
                               Improving Lead Risk Assessments and Cleanup Decisions  ........... ... 1-4
                       Lead-based Paint and Property Transfer at BRAC Installations .................. 1-4
                       Promoting a Fairer Superfund Enforcement Program .......................... 1-5
                               Enforcement First/Cost Recovery .................................. 1-6
                       Maximizing Program Effectiveness and Efficiency ............................ 1-6
                               Reinventing Site Assessment .............................. ........ 1-6
                               Base Closures  ..... , ....... . .................................... I_7
                               Environmental Indicators  ........................................ I_7
                                       Environmental Indicators and WasteLAN  .................... 1-9
                               Effective Contract Management  .............. '.  .................... 1-9
                       Building Superfund Partnerships
                               Enhancement of State/Tribal Role  ........................ . .......  I.-IQ
                               Superfund Block Funding/EPA. Performance Partnership Grants  _______ ____  1-1 1
                               RCRA/NPL Deferral of Federal Facility Sites  .......................  Ml
                                       Background ..................... . .....................  \.\\
                               Clarifying Policy for NPL Listing .................................  1-12
                               Policy for Deleting Sites from NPL Based Upon RCRA Deferral ........  1-12
                               Piloting State Remedy Selection ..................................  1-13

               Encouraging a Customer Orientation . . . . ........................... . .............  I_13

               Brownfields ........................................ . ............ ........ _    j. ^4
                       History [[[  j_14
                       Brownfields Pilots .................................... . ...............  1.14
                       Brownfields National Partnership Action Agenda ............................  1-14
                       Tax Incentive [[[  j_14

               Oil . .................... . ............................................... . .  !_15

       I.C Superfund Reforms (Previously Known as Administrative Reforms) ..................... ...  M5


-------
OSWER Directive 9200.3-14-IE
                                       This Page Intentionally
                                             Left Blank
July 1, 1998

-------
                                                                          OSWER Directive 9200.3-14-1E
                                             CHAPTER I
                             PROGRAM GOALS AND PRIORITIES
LA  INTRODUCTION
    The focus of the Superfund program is to maximize the protection of human health and the environment through
fast, effective cleanup of priority hazardous waste sites and releases.  In order to leverage the number of cleanups that
can be accomplished, maximizing PRP participation is a priority. The most essential principle of the Superfund program
is that the worst sites are cleaned up first. In addition, the acceleration of site cleanup and National Priority List (NPL)
construction completion is integral to the success of the program. Implementation of the program also will be facilitated
by a strong collaboration with the States and Indian Tribes. Partnerships are an integral part of the Brownfields program.
Furthermore, collaboration with the Department of Defense will be necessary as the Agency continues to assist in
assessing base closure properties.  Finally, the Superfund program will continue to employ Environmental Indicators
(Els)  as a crucial tool for evaluation and communication and, in FY 99/00,  the Superfund and Oil programs will
implement the Government Performance and Results Act (GPRA) of 1993.  The current SPIM is a biennial document
for the fiscal years of 1999 and 2000. This conforms to the Agency's two year planning cycles.

Superfund and its History

    The Superfund program began when Congress passed the Comprehensive Environmental Response, Compensation,
and Liability Act (CERCLA) in 1980. Prior to this, there was no authority for direct Federal response to hazards posed
by abandoned and uncontrolled hazardous waste sites.  Existing environmental laws, such as the Resource Conservation
and Recovery Act (RCRA),  provided regulatory requirements  to address  present activities and prevent future
catastrophes, but lacked authority to allow Federal emergency and long-term responses to past disposal problems.

    CERCLA is unique in that it provided the first Federal response authority to address the problem of uncontrolled
hazardous waste sites.  CERCLA, for the first time, required EPA to step  beyond its traditional regulatory role and
provide response authority to clean up hazardous waste sites.

    In October 1986, Congress reauthorized CERCLA by enacting the Superfund Amendments and Reauthorization Act
(SARA). The enactment of SARA resulted in the following changes to the Superfund program:

    •       Increased the size of the Trust Fund to $8.5 billion and refined its finances;
             (Note: The Fund was largely financed by a tax on crude oil and 42 commercially used chemicals. Expired
             12/31/95)

    •       Stressed the development and use of permanent remedies;

    •       Provided enforcement and settlement tools;

    •       Increased State involvement in the Superfund Program; and

    •       Included Title  III, a freestanding statute, that created the Emergency Planning and Community Right-to-
             Know Act (EPCRA).  EPCRA is designed to help communities prepare to  respond in the event of a
             chemical emergency, and to increase the public's knowledge of the presence and threat of hazardous
             chemicals.
                                                   1-1                                        July 1, 1998

-------
 OSWER Directive 9200.3-14-1E

 The National Oil and Hazardous Substances Pollution Contingency Plan (NCP) was revised based on SARA and is the
 major regulatory framework that guides the Superfund response effort. The NCP outlines a step-by-step process for
 implementing Superfund responses and defines roles and responsibilities of EPA, other Federal agencies, States, private
 parties, and the communities in response to situations in which hazardous substances are released into the environment.

     In 1992, EPA introduced the  Superfund Accelerated  Cleanup Model (SACM).  SACM was  responsible for
 expediting the cleanup of uncontrolled waste sites and redefining the way Superfund progress is measured.

     The Superfund program is comprehensive, yet flexible and innovative. Its mission is both immediate and long-range.
 Its focus is specific enough to handle individual site cleanup with precision, yet broad enough to encourage advances
 in a relatively new scientific and technical field.  Today the hazardous waste problem in the United States remains large,
 complex and long-term.

 Rcauthorization

     The Omnibus Reconciliation Act of 1990, which extended Superfund authority from FY 90, expired in 1994.
 Currently, discussions of Superfund reauthorization are on-going in sub-committees in both the U.S. Senate and the U.S.
 House of Representatives.  Through the act of appropriations, SARA authority for the Superfund program has been
 extended. Additional information will be provided following enactment of a revised Superfund law.
 LB  CURRENT PROGRAM PRIORITIES

 Superfund

    ^ The continued focus of the Superfund program in FY 99/00 is to maximize the protection of human health and the
 environment through fast, efficient cleanup of priority hazardous waste sites and releases.  Protecting public health and
 the environment, promoting a fundamentally fairer Superfund program, maximizing program effectiveness and efficiency,
 building Superfund partnerships, and encouraging a customer orientation are Superfund's highest priorities for FY 99/00.
 Superfund also shall work for reauthorization and show progress through Superfund Reforms and compliance with
 GPRA.

    Protect Public Health and the Environment

    EPA is committed to increasing the number of NPL construction completions. To accomplish this objective, the
    Agency will ensure  that available resources are disbursed in a fiscally sound  manner—according to  the risk
    prioritization scheme, and that appropriate contract vehicles (including performance based contracts and lAGs) are
    available.  In addition, the Superfund program will provide real time policy calls to promote efficient cleanup.
    Maximizing potentially responsible party (PRP) involvement will be imperative to meeting this goal.

         Construction Completions

        The goal established by the President is 900 construction completions by the end of calendar year 2001. There
        are a sufficient number of sites with final RODs signed to meet this goal. Sites in the RD/RA stages will be
        efficiently managed to ensure work continues in a timely manner through to construction completion.  Regions
        and States must continue to work together to identify opportunities for expediting construction completions and
        response actions.
July 1, 1998                                        1-2

-------
                                                                    OSWER Directive 9200.3-14-1E

The primary mission of the Superfund Federal facilities program is to ensure that the hazardous waste sites
owned or operated by the Federal government are addressed and cleaned up as quickly as possible. Regional
efforts should be focused on getting to completion of construction activities at Federal facilities whether they
are accomplished under remedial or removal authority. Meeting these goals will help build the program's
credibility, which is vital to Superfund's long-term success.

Innovative Technologies

Environmental technology  development and  commercialization  are  a top  national  priority  for 'this
Administration. EPA is committed to encouraging the use of new or innovative Technologies for contaminated
soils and ground water.  Over the next decade, the Superfund program and other Federal agencies will spend
billions of dollars each year to cleanup sites contaminated with hazardous wastes.  This commitment will require
the use of a  wide range of site remediation processes.  While existing Technologies to characterize and
remediate contaminated sites have ben successful, the investment in site clean up offers new opportunities for
the development of less expensive and more effective solutions.

The Agency has made considerable progress using new Technologies in Superfund.  More than half of the
recent remedial clean-up decisions for source control call  for Technologies that were not available when the
law was reauthorized in 1986. The large cleanup needs remaining in EPA programs, as well as the formidable
future requirements for State and other Federal agencies, provide a continuing impetus to find more effective
and less costly solutions.

The unique and varying problems posed by contaminated sites present a challenge that requires knowledge and
techniques from different technical disciplines.  The solutions to these problems are not to be found in existing
design manuals or standards of practice. Rather, EPA is developing procedures as it goes along by creatively
applying Technologies from various industrial applications to  unique site conditions. This field of hazardous
site remediation is rapidly evolving and requires considerable effort to remain informed of recent developments.

EPA is attempting to expand the participation of responsible parties in technology development by altering the
Agency's historical role and working more closely with the private sector as a partner  with shared objectives.
Conventionally, EPA has been viewed primarily as a regulator, permit issuer, and enforcer. These functions
have kept it at arms length from industry, which tended to view the Agency with a negative bias.  EPA has been
working to build new relationships with the private sector that are based on  other EPA roles including
technology broker, researcher, and grant maker. These cooperative efforts are' expected to result in better-
directed research and more joint demonstration projects. A number of significant collaborative endeavors in
the areas of technology development and evaluation  are currently under way.

The Agency is also very committed to the dissemination of information on technology development, evaluation
and deployment.  Electronic information resources offer the best hope for keeping pace with the  rapid
developments in this field. The Clean-Up Information (CLU-IN) web site at http://clu-in.com offers waste
professionals  a rich source of current information on Technologies and markets.  The TechDirect monthly
electronic-mail service offers subscribers up-to-date information on new remediation technology products and
services developed by EPA.

Federal facility sites provide an excellent testing ground for assessing and demonstrating the use of innovative
Technologies.  Many Federal facilities  offer a number of benefits: sole responsible party; acknowledged
liability; controlled sites; funding; and willingness. For these reasons, the Agency  expects to see more public-
private partnerships established at Federal facility sites.
                                            1-3                                         July 1, 1998

-------
 OSWER Directive 9200.3-14-1E

         Improving Lead Risk Assessments and Cleanup Decisions

         Superfund Reform 6c, utilize expert workgroup on lead (Pb), provides for making fuller use of the work of the
         Technical Review Workgroup (TRW) for lead. The TRW is a group of technical experts from EPA Regional
         Offices and several headquarters offices that provide advice on the assessment of lead risks. Two steps are
         being taken to improve better decisions.  First, a group named the Lead Sites Workgroup (LSW) has been
         formed. The LSW is made up of site managers from across the country that address lead contamination, some
         representatives of the TRW, and relevant headquarters offices.  Second, the activities of both of these groups
         are discussed with the Lead Sites Consultation Group (LSCG), which is composed of Regional Waste
         Management Division Directors or their designees.  This group is chaired by the Director of the Office of
         Emergency  and Remedial Response (OERR). The interactions among these groups should help to ensure that
         priorities are set according to program needs and better science will be communicated in the support of lead
         cleanup decisions.

         Lead-based Paint and Property Transfer at BRAC Installations

         Questions concerning the appropriate response to the potential release of lead in soil as a result of the  historic
         use of lead-based paint (LBP) is an issue that could delay the completion of cleanup and the transfer of property
         at BRAC installations. As a policy issue, however, it is not just limited to BRAC properties. This topic was
         discussed by the DERTF during FY 1997.

         Examples of issues that have arisen on LBP include:

         •       Type and quantity of information required to support the CERCLA 120(h)(3) covenant;
         •       Application of CERCLA and Title X (including TSCA Section 403) in residential areas;
         •       The need fora workable approach for non-residential/industrial areas including areas where children
                 may be present (e.g., recreational areas); and
         •       Language and basis for regulator concurrence on FOSTs and FOSLs.

         During the past year, HUD and EPA have continued to move forward to promulgate regulations under Title X.
         FY 98  should see finalization of the HUD's regulations and  proposal of EPA's regulations on LBP hazard
         reduction under TSCA Section 403. HUD also continues to update its guidelines. (EPA issued policies under
         CERCLA and TSCA on LBP in July 1994).  In 1994, DoD  issued a policy to the Services to comply with
         requirements of the Residential Lead Based Hazard Reduction Act of 1992 (Title X).  State governments, as
         well, continue to propose and enact LBP regulations, policies and guidance. EPA and DoD both want to ensure
         that the forthcoming regulations are applied in a manner which is fully protective of human health and the
         environment. DoD intends to comply with these regulations in  such a manner as to satisfy CERCLA 120 (h)(3)
         concerns. The objective for residential areas is to achieve an adequate level of CERCLA equivalence by use
         of the soon to be released HUD Title X regulations, existing HUD guideline, EPA's forthcoming TSCA Section
         403 Rule, and EPA's existing guidance on LBP.

         EPA and DoD in mid-January 1998 agreed to develop a framework to address the issue of LBP in residential
         areas and to  form a workgroup to compile existing laws, regulations, policies and guidance and then develop
         a guide book for field level use, e.g., a Fast Track to FOST-type document. EPA invited the participation of
         HUD and GSA, and the States of Indiana and California.  After several unsuccessful attempts to work together
         on the guide book, the interagency workgroup disbanded.
July 1, 1998
1-4

-------
                                                                            OSWER Directive 9200.3-14-1E

    Promoting a Fairer Super/and Enforcement Program

    EPA must assure fair treatment of all PRPs, especially small volume contributors and parties with a limited ability
to pay who will be targeted for early and prompt settlements. PRP searches to pursue parties identified by other PRPs
will be emphasized, as will Alternative Dispute Resolution (ADR).  Allocation of response costs will be emphasized
through pilots and mixed funding will be used where appropriate. Steps will be taken to reduce private sector transaction
costs associated with cleanup of contaminated sites.    '   ,

    EPA  has initiated  several reforms to address enforcement fairness  and reduce transaction costs, including
compensating settlors for a portion of the orphan share, adopting private party allocations, and using special accounts
in order to dedicate settlement funds to specific sites. These initiatives are now a part of the way the Agency does
business.

    The initiatives fall roughly into two categories: some are intended to reduce the transaction costs paid by PRPs as
part of the settlement process; others are designed to ensure that PRPs are only asked to assume a fair portion of the
response costs for the sites where they are involved.  Specific initiatives include:

    •        Orphan Share Compensation — EPA will help fund a portion of the Superfund cleanup costs attributable
             to parties that are financially insolvent as a way to ensure that remaining viable PRPs are not asked to pay
             for substantially more than their share of the site cost.

    •        PRP Oversight Administration — The purpose of the reform on PRP  oversight is to maximize the
             effectiveness and efficiency of PRP oversight while still ensuring that PRPs conduct high quality cleanups
             and the public's interest is protected. For FY 99, the focus of the PRP oversight administrative reform will
             be to implement practices to achieve or enhance good working relationships with capable and cooperative
             PRPs. Under this reform, Regions will meet with participating PRPs to:

                                 provide information on planned oversight activities;
                                 discuss potential future oversight costs;
                                 review oversight activities of the previous billing period, and
                                 commit to send timely bills for oversight costs incurred.

    •        "De Micromis" Settlements — EPA  has doubled the threshold amount of waste a  party may have
             contributed to a Superfund site without being held liable for cleanup costs. The new policy relieves these
             small contributors of  having to pay  for a portion of the cleanup at a site, virtually  eliminates their
             transaction costs, and protects them from "third-party" suits from larger waste contributors. While EPA
             will enter into "de micromis" settlements when requested, the  ultimate measure of success of this policy
             change will be that "de micromis" parties are no longer pursued and there is no  need to enter into such
             settlements.

    •        Alternative Dispute Resolution — EPA is expanding its use of ADR as a way to reduce  the costs of
             achieving settlement with PRPs.  PRPs who choose this alternative should see dramatically reduced
             transaction costs compared to what would have been encountered during litigation.  Also, ADR can be used
             in other context (e.g., dispute with States regarding cleanup sites).

    •        Equitable Issuance of UAOs — EPA will  issue UAOs to the maximum manageable number of PRPs
             wherever there is sufficient basis to include them. Issuance of these  UAOs will compel those PRPs to
             participate in, and share the cost of, the specific response actions. The participation of these PRPs, even
             if only through a financial contribution, will reduce the portion of the cleanup cost that is borne by PRPs
             who have settled with EPA.
                                                    1-5                                         My 1, 1998

-------
 OSWER Directive 9200.3-14-1E

     •       PPAs and Comfort/Status Letters — EPA will evaluate all  appropriate requests for prospective
             purchaser agreements and comfort/status letters to assist in the removal of liability barriers for sustainable
             development/Brownfields initiatives.

     •       Interest Bearing Special Accounts — As a result of a special agreement between OMB, the Treasury
             Department and EPA, EPA Special Accounts will now accrue interest.  Special Accounts are created when
             PRPs settle their liability at a site with a cash payment toward the future costs of the response. All funds
             in a Special Account must be applied to the direct costs of the response covered by the settlement. Now
             that  these accounts will accrue interest, the total amount of money available from the accounts will
             increase, providing EPA with more money to: 1) pay for part of an EPA led response; 2) defray costs EPA
             incurs at a PRP led site (e.g., past costs or oversight costs); 3) or help pay the costs of a PRP led response.

         Enforcement First/Cost Recovery

         In order to leverage the number of cleanups that can be accomplished, maximizing PRP participation is a
         priority. Key areas of emphasis are early initiation of PRP searches, negotiations to secure PRP-lead cleanup
         activities, maximizing PRP response leads, addressing cost recovery at all sites with total costs greater than
         $200,000 prior to the expiration of the Statute of Limitations (SOL), using ADR to resolve costs owed, and
         compliance monitoring to ensure violations are documented and addressed.  As a result to this approach, PRPs
         have undertaken the majority of new cleanup actions in past years, accelerating the pace of cleanup far beyond
         what could be done if only Superfund resources were used.  Early involvement by PRPs ensures that their
         transaction and cleanup costs are kept to a minimum.

     Maximizing Program Effectiveness and Efficiency

             To maximize the effectiveness and efficiency of the Superfund program, during FY  99/00, EPA HQ and
     Regions will work to:

         •        Develop appropriate long-term contract strategies;

         •        Implement fully the new generation WasteLAN system to improve project, program, and enforcement
                 management of Superfund,  and ensure that there are data sponsors for key areas;

         •        Enhance resource management controls;

         •       Adjust administrative and communication processes to suit the new organization;

         •       Strengthen  the program by incorporating quality assurance, peer review, and program evaluation
                components into rule makings, guidances, and policies;

         •       Make changes in the implementation of the program based on  these processes; and

         •       Enhance the Agency's approaches to post cleanup site management.

         Reinventing Site Assessment

         EPA is considering alternatives to the current site assessment approach (PA, SI,  ESI, HRS and integrated
         assessment). However, until that review is complete, Regions may use site assessment resources to explore
         innovative approaches. Among these are the review of readily available information to "prescreen" sites for
         potential CERCLIS entry, conduct streamlined assessments of non-CERCLIS sites in support of Brownfields,
         and streamlined risk assessments of CERCLIS sites. Past guidance limited assessments at non-CERCLIS sites.

July 1, 1998                                         1-6

-------
                                                                    O.SWER Directive 9200.3-14-1E

However, in FY 99/00, flexibility is appropriate, given the direction and needs of the program. Though a cost
limit will not be specified, those limited but more expensive assessments at non-CERCLIS sites (i.e., those
where costs exceed a PA or ASTM Phase I), will require a greater accounting and tracking, sufficient to justify
expenditures under audit conditions.  At a minimum, there needs to be a description of the assessment work
being conducted and the expected benefits of this work available for review upon request. Given the various
priorities and constrained site assessment resources, a careful balancing of activities is important.

Priorities for site assessment include listing appropriate sites on the NPL, evaluating the backlog of sites in the
CERCLIS inventory to  determine high-priority sites and those not requiring Federal response action, and
assessing non-CERCLIS sites in conjunction with EPA's Brownfields  initiatives. The percentage of site
assessment funding devoted to each of these priority areas will not be established given variations in Regional
workloads; however,  careful balancing  of these  priorities is important given constrained site assessment
resources. Regions and States with significant CERCLIS backlogs need to ensure steady progress is being made
addressing them.  Regions and States without such backlogs can give higher priority to non-CERCLIS sites.
In general, ten percent  of the site characterization funds distributed to the Regions may be  used for site
assessment activities at sites not in CERCLIS. EPA Headquarters must approve expenditure of funds beyond
this amount.

Base Closures

Under the Base Realignment and Closure Acts of 1988, 1991, 1993, and 1995, 205 military installations are
scheduled for closure or realignment. Of this total, 110 are part of President Clinton's Fast Track Cleanup
Program, and of those, 32 site are on the National Priorities List (NPL), and there are a number of non-NPL
sites requiring some degree of decontamination. The Agency must continue to assist the Department of Defense
(DoD) in assessing these properties, accelerating cleanup actions wherever possible, listing sites on the NPL
where appropriate, and ensuring that remedies selected reflect the views of affected communities at NPL sites
meet  Superfund  criteria.   HQ and  Regional managers must work with  DoD, Tribal,  State,  and local
governments, and private interests to expedite cleanup and support responsible transfers of Federal property
to non-Federal parties for reuse and economic development.

Environmental Indicators •

In 1989, EPA's Administrator directed all EPA programs, including Superfund, to develop Environmental
Indicators  (Els)  of program progress.  Superfund-related indicators were intended  to document and
communicate  incremental environmental progress towards cleaning up and restoring abandoned hazardous
waste  sites.  Substantial site cleanup progress towards reducing adverse effects to human health and the
environment was not  properly communicated by simply stating the number of sites deleted from the NPL.
Superfund Els are designed to communicate that the true measure of the program's success is tangible progress
in protecting human health and the environment through incremental site cleanup activities.  Today, El data are
fundamental to the effective evaluation and communication of the Superfund program. Els are the preeminent
means for EPA to show how, and to what extent, Superfund cleanups are reducing risks to people and the
environment.

Els are program-based indicators that measure efforts at each stage of Superfund's "cleanup pipeline" toward
addressing hazardous waste problems and achieving established goals. These measurements are achieved by
totaling the following site data:

•        Indicator A:  Populations Protected quantifies  efforts to  protect people  and the environment from
         immediate threats—including  supplying  safe water, securing sites, and relocating threatened
         populations.
                                            1-7                                        July 1, 1998

-------
 OSWER Directive 9200.3-14-IE

         •        Indicator B: Achieving Permanent Cleanup Goals qualitatively and quantitatively delineates efforts
                  to clean up sites permanently and to fully address persistent threats.

         •        Indicator C: Bringing Technology to Bear characterizes the volumes of waste handled and  the
                  application of appropriate treatment and containment Technologies to hazardous site cleanup.

         Data collected  via  these three indicators show how Superfund cleanup activities  are  continually and
         incrementally reducing the threats that hazardous waste poses to people and the environment. This incremental
         environmental progress reporting is critical to Superfund's efforts to move evaluations of the program away
         from total site cleanup and "deletion" from the NPL as being the only measure of Superfund's progress and
         success.

         Therefore, Els serve a number of important purposes for the Superfund program:

         •        A mechanism to improve understanding of site characteristics and cleanup activities on the part of the
                  community, media, elected officials, and other stakeholders, and to encourage community interest and
                  involvement in site decisions;

         •        A data  source to produce an extensive informational packet for ongoing Congressional testimony
                  towards Superfund Reauthorization—based on the compilation of national and regional data reports
                  and a general overview of current Environmental Indicators;

         •        A compendium of technical data on Superfund sites that supplements administrative and budgetary
                  data to enhance program management capabilities;

         •        Data points for consolidation into the larger Superfund and OSWER GPRA reporting structures.
                  National and Regional data are incorporated as important elements in overall Agency planning,
                  measuring, and reporting; and

         •        Current Els have served as a baseline for on-going discussions with the Association of State and Tribal
                  Solid Waste Management Organizations (ASTSWMO) Workgroup to develop a consistent and precise
                 set of metrics that can be used for all State and Tribal solid waste programs across the country.

         In addition to the three current Els, the Superfund program is developing three new Els.  These are based on
         data currently entered into WasteLAN or data  fields that will be included in WasteLAN.  Indicators being
         reviewed as prototypes include the following:

         •        Indicator D assesses the reduction in human health risks and the elimination of exposure pathways by
                 Superfund actions. A primary focus of Indicator D—documenting the protection of human health—is
                 accomplished through site-specific risk reduction case studies. Indicator D assesses  the degree to
                 which health threats have been reduced by the actions taken at hazardous waste sites in terms of cancer
                 risk reduction and non-cancer hazard reduction.

         •        Indicator E is being developed to account for the progress being made toward protecting ecological
                 resources.  Indicator E reports the effects of hazardous  wastes on flora and fauna surrounding and
                 within Superfund sites, the remedial actions taken to mitigate ecological stressors, and the actions
                 Superfund has taken to restore critical ecological resources.
July 1, 1998                                         1-8

-------
                                                                   OSWER Directive 9200.3-14-1E

•       Indicator L provides a metric of land that is returned—or potentially ready to be returned—to
        productive use through site cleanup. Because of the incremental stages inherent in site cleanup, land
        or acreage returned potentially can fall into one of four categories: (1) deleted from the NPL; (2)
        construction completion; (3) partial deletions (fully remediated parcels of land at sites that otherwise
        have not yet been entirely cleaned up); and (4) sites potentially ready to return to productive use. It
        is expected that this Indicator will not only show acreage returned, but will also be used in conjunction
        with Indicator B, medium goal attainment, to indicate future partial deletion sites.

Environmental Indicators and WasteLAN - With the implementation of the new generation of WasteLAN, a
number of system and architecture improvements have occurred that facilitate the update of El and reflect the
program's increased understanding of environmental progress tracking. Improvements to WasteLAN include:

•   El data entry aligned with quarterly SCAP reporting, and El audit reports (Site 12) provided to the Regions
    semi-annually;

•   Reduced El reporting requirements on the Regions due to increased sharing of data between functionally-
    linked areas in the new database;

•   All data, including goal attainment, tracked for non-NPL as well as NPL sites;

•   In some instances (for example, at the site level), goal attainment is automatically calculated;

•   Risk data is  used to support Indicator D reporting;

•   On-line El reports are available to Remedial Project Managers (RPMs) and Information Management
    Coordinators (IMCs) — for example, the national, Regional, and State-level El data compilation reports,
    and an El data quality report; and

•   An improved El Audit Report  (Site-12), to be provided to the Regions semi-annually, is expected to
    increase the  precision and accuracy of El data by allowing RPMs and IMCs to automatically review data
    points outside two statistical deviations, edit El data errors, and include El data omissions regarding their
    sites.

Effective Contract Management

Good contract management is a Superfund priority, as well as an Agency-wide priority.    The Agency is
completing the final phase of implementation of the Superfund Long-Term Contracting Strategy (LTCS).

LTCS provides the mechanisms for greater contractor flexibility and improved oversight and cost management
by giving Regions full responsibility for contract management.  For example, the national Special Analytical
Service (SAS) contracts  have been totally decentralized. Each Region has implemented its own strategy by
taking over the  management of the SAS contracts. In addition, Regional contracting officers and project
officers are currently managing a new stable of Regional Superfund contracts in the following areas: Superfund
Technical Assistance and Response Teams (START); Emergency and Rapid Response Services (ERRS);
Response Action Contracts (RACs); and Enforcement Support  Services (ESS).

The Agency established a national workgroup to develop a new Superfund acquisition strategy for the year 2000
and beyond. The Contracts 2000 strategy builds upon the LTCS paradigm. The new strategy retains two key
tenets  of LTCS—a one-program approach and decentralization of contracts management to the Regions.
However, it represents a,shift away from large umbrella contracts, such as ARCS and RACS, toward smaller
more functional  contracts.


                                            1-9                                         July 1, 1998

-------
 OSWER Directive 9200.3-14-1E

         Under the Contracts 2000 strategy, the Response Action Contracts (RACS) contract will be divided into two
         distinct contracts.  A remedial design contract to do Remedial Investigation/Feasibility Studies (RI/FS), and
         a remedial action contract for construction. The strategy will incorporate RI/FS into the new design contract
         rather than in the follow-on Superfund Technical Assessment and Response Team (START) contract.

         The new strategy will increase opportunities for fixed price, completion form, and other performance-based
         contracting mechanisms, as well as socioeconomic opportunities for small and disadvantaged businesses.
         Contracts 2000 retained the LTCS components of the Enforcement Support Services (ESS), START, and ERRS
         contracts. On the  other hand, the strategy will bring uniformity in the ordering and delivery of Analytical
         Services.

         The Contracts 2000 Strategy achieves national consistency through the development of uniform statements of
         work. Regional flexibility is obtained via a menu driven option allowing Regions to select only those activities
         from the SOW necessary to support program functions. However, items not selected must be explained in the
         acquisition plan as  to where these services will be obtained.

         On the other hand, contracts will be more efficient and effective as for time and cost,  and the potential for
         contract overlap across Superfund contracts will be reduced. The strategy continues to rely upon the U.S. Army
         Corps of Engineers and the Bureau of Reclamation to provide the Agency with significant resources for
         construction management support.

         At Federal facility sites, particular attention must be paid to potential or actual conflicts of interest involving
         EPA contractors who also may be working for another Federal agency.

     Building Superfund Partnerships

     FY 99/00 goals to support building Superfund partnerships and leveraging existing resources are:

     •    Provide tools for Regions to use to promote and  continue early community involvement in key clean-up
         decisions, specifically regarding land use, risk assessment,  and RODs;

     •    Work with State, Tribal, and business associations to determine ways to improve their capabilities to clean up
         hazardous substances and respond to spills; and

     •    Implement a cooperative program with oil companies to prevent and respond to leaking above ground tanks.

     Initiatives include continuing the implementation of the Brownfields Economic Redevelopment Initiative, enhancing
     the State/Tribal role, providing States/Tribes with increased funding allocation decision authority, clarifying the
     policy for NPL listings,  and providing States and Tribes with an increased role in remedy selection.

         Enhancement of State/Tribal Role

         The Superfund program places a very high priority on empowering States and Indian Tribes to play a greater
         role in the Superfund program's implementation. The Administration's Superfund reauthorization position and
         several Superfund reforms are evidence of this.

         Entering FY 98, EPA HQ, Regions and States/Tribes were completing a collaborative plan to enhance the role
         of States and Tribes in Superfund's implementation. This work is coordinated by the Leadership Integration
         Team, which includes the leaders of four HQ/Region/State-Tribal workgroups: (1) Readiness, (2) Assistance,
         (3) Agreements, and (4) Tribal programs. A State/Tribal Superfund Management Council (SMC) provided
         executive direction  and input to this effort.
July 1, 1998
1-10

-------
                                                                    OSWER Directive 9200.3-14-1E

 Proposed pilot recommendations call for pilot implementation of the plan's integrated process for enhancing
 the State/Tribal role during FY 98. This will entail work by EPA Regions and State/Tribes to assess current
 levels of readiness for various Superfund program functions, identification and negotiation of financial and
 technical assistance to enhance readiness, and development of new program agreements to foster increased
 State/Tribal responsibilities in Superfund implementation.

 Superfund Block Funding/EPA Performance Partnership Grants

 EPA has developed an Agency-wide system for providing States/Tribes with increased funding allocation
 decision authority. The National Environmental Performance Partnership System (NEPPS) establishes a
 structure for Performance Partnership Grants (PPG), a single grant made to a State or Tribe from grant funds
 allocated and otherwise available for existing categorical grants programs. PPGs are voluntary and provide
 States and Tribes with the option to combine funds from two or more categorical grants into one  or more
 PPG(s).

 The purposes of the PPG are to (1) increase State and Tribal flexibility to address their highest environmental
 priorities across all media and establish resource allocations based on those priorities, while continuing to
 address core program commitments; (2) more effectively link program activities with environmental goals and
 program outcomes; (3) develop innovative pollution prevention, ecosystem, and community based  strategies;
 and (4) develop  partnerships between EPA and the States  and Tribes where all parties share the same
 environmental and program goals, and deploy their unique resources and abilities to jointly accomplish those
 goals.

 By statute, Superfund monies cannot be included in PPGs, because these funds may not be expended for
 purposes other than Superfund. Nonetheless, several States are including their Superfund programs  in NEPPS
 agreements and, in time,  it may  be  feasible to include Superfund resources in PPGs.  In  the near-term,
 Superfund is exploring the feasibility of Superfund Block Funding awards to move in a direction  consistent with
 PPGs; initial block funding awards have been made to  Minnesota and Colorado. EPA will  be working to
 encourage further progress  toward the goals of flexible  funding within the context of strong program
 commitments to Superfund outcomes.

 RCRA/NPL Deferral of Federal Facility Sites

 Background - On March 31, 1989 (54 FR 10520) the Agency adopted a policy for listing Federal facility sites
 that are eligible for the NPL, even if they are also subject to the corrective action authorities of Subtitle C of
 RCRA.  The Agency based its decision on the view that CERCLA and its legislative history indicate that
 Congress intended that Federal  facility sites generally be placed on the NPL and  addressed  under the
 Interagency Agreement process set out in CERCLA section 120(e).

 CERCLA Section 120(d) - The Defense Authorization Act of FY 97, amended CERCLA section 120(d) and
 now provides in section 120(d)(2)(B) that:

    It shall be an appropriate factor to be taken into consideration for the purposes of section 105(a)(8)(A)
    [NPL listing] that the head of the department, agency, or instrumentality that owns or operates a facility
    has arranged with the Administrator or appropriate State authorities to respond  appropriately, under
    authority of a law other  than this Act  [CERCLA], to a release or threatened release of a hazardous
    substance.

The legislative history of this provision indicates that Congress sought to give the EPA Administrator  discretion
to "withhold National Priorities List designation of a Federal facility cleanup action if the site is already subject
to an approved Federal or State cleanup plan." In light of this amendment to CERCLA and the ongoing Agency
efforts for administrative reforms to CERCLA that allow greater flexibility to address Superfund sites, EPA is
revising its listing policy for Federal facility sites. The Agency believes that this revision may free CERCLA

                                           I-H                                        July 1,1998

-------
OSWER Directive 9200.3-14-1E

        oversight resources for use in situations where another authority is not available.

        Criteria for RCRA/NPL Deferral of Federal Facility Site - A site should satisfy all of these criteria to be eligible
        for deferral.  Where there is uncertainty as to whether the criteria have been met, deferral generally will be
        inappropriate. The criteria are as follows:

         1.  The CERCLA site is currently being addressed by RCRA corrective action authorities under an existing
            enforceable order or permit containing corrective action provisions.

        2.  The response under RCRA is progressing adequately.

        3.  The state and community support deferral of NPL listing.

         Clarifying Policy for NPL Listings

        During FY 97, OSWER issued two policy statements for listing sites on the NPL, which clearly showed EPA's
         intent to increase the role of States and Tribes in NPL site selection. These policies clarify the program's
        approach to coordinating listings with States and Tribes. The November 14, 1996, policy memorandum entitled
        "Coordinating  with the States  on National Priorities List Decisions" provided  information on OSWER's
        expectations that Regions consult with States and Tribes on sites the Region believes warrant consideration for
         listing on the NPL. It required Regions to query States/Tribes regarding their support for NPL listing as early
        as practical, ideally prior to initiating a Hazard Ranking System (HRS) package.

        A follow-up memorandum was issued on July 25, 1997, entitled "Coordinating with the States on National
        Priorities List Decisions — Issue Resolution Process."  This policy clarified the process to resolve any cases
        where the Region advocates listing a site on the NPL, but the affected State or Tribe is not supportive of NPL
         listing.  It calls for formal correspondence and  high-level negotiations between the Region and State, and
        provides a process for the AA SWER to decide any cases that can not be resolved directly between the Region
        and State/Tribe. Both of these policies will remain in effect in FY 99/00.

        The Superfund program is also considering means for streamlining the listing process. This initiative includes
        providing  greater autonomy to Regions to perform the actual site listings and developing  a  more concise
        documentation record to support NPL listings.  This streamlining initiative should  make the listing process
        quicker and more efficient.

         Current plans are to publish three combined Proposed and Final NPL Listing rules during the fiscal year. The
        preliminary schedule called for combined rules in January, May, and September, 1998. Also,  HQ is available
         to provide any early technical assistance Regions may desire for NPL listing actions. Any questions regarding
        NPL listing policies or technical assistance should be directed to the State, Tribal and Site Identification Center
        ofOERR.

        Policy for Deleting Sites from the NPL Based Upon RCRA Deferral

        Background - RCRA Deletion Policy- On March 20, 1995 (60 FR 14641), EPA announced the adoption of a
         policy for deleting RCRA facilities from the NPL before a cleanup is complete, if the site is being, or will be,
         adequately addressed by the RCRA corrective action program, and provided certain criteria were met. The
         Agency based its action on the goals of freeing CERCLA oversight resources for sites where another authority
         is not available and avoiding possible duplication of effort. The Agency made clear that such policy does not
         pertain to Federal facility sites, even if such facilities are also subject to the corrective action authorities of
July 1, 1998                                         1-12

-------
                                                                            OSWER Directive 9200.3-14-IE

        Subtitle C of RCRA.  The Agency noted that one of the primary goals of deferral — maximizing the use of
        limited Fund monies — did not apply to Federal facility sites since Federal facilities typically are not eligible
        for Fund financed remedial action. Furthermore, the goal of avoiding duplication of efforts could be resolved
        through the use of comprehensive Interagency Agreements.

        Revision to RCRA Deletion Policy - CERCLA section 120(d)  was amended by the Defense Authorization Act
        of FY 97.  The legislative history of this provision indicates that Congress sought to give the EPA Administrator
        discretion to "withhold National Priorities List designation of a Federal facility cleanup action if the site is
        already subject to an approved Federal or State cleanup plan." (Conference Report at 724). In light of EPA's
        express discretion under section 120(d), EPA believes that is also now appropriate to apply the Agency's RCRA
        deletion policy to Federal facility sites on the NPL. The first criterion under the RCRA deletion policy is that
        a site be eligible for RCRA deferral under EPA's current RCRA/NPL deferral policy.  Until EPA revised the
        1989 Federal facility site listing policy, no Federal facility could satisfy the RCRA deletion policy criteria. The
        Agency believes that revising the RCRA Deletion Policy to be applicable to Federal facility sites is consistent
        with CERCLA section 120(d),  as amended, and the ongoing  Agency efforts for administrative reforms to
        CERCLA that allow greater flexibility to address Superfund sites. The Agency believes that this revision may
        free CERCLA  oversight resources  for  use in situations  where  another  authority is  not  available.
        Notwithstanding this policy revision, EPA  still believes that  duplication of effort at Federal facility sites can
        be resolved through the use of comprehensive Interagency Agreements.

        Piloting State  Remedy Selection

        State remedy selection is a Superfund reform that will allow some States, through pilots to select remedies
        consistent with CERCLA and the National Contingency Plan (NCP) for some operable units  at non-Federal
        facility  sites.  The goal of this reform is to provide States with an increased role in remedy selection at NPL
        sites in certain circumstances. State remedy selection allows States to take the lead in selecting remedies while
        ensuring that the cleanup approach will be consistent with CERCLA and NCP. Under this pilot project, the
        State determines the cleanup approach for the ROD.

        EPA and selected States will enter into agreements through which the States will conduct the remedy selection
        process, consistent with applicable laws and regulations, at certain NPL sites. Participating States supervise
        the entire remedy selection process with minimal EPA oversight or involvement, giving States significantly
        more control over NPL site cleanup.

        An EPA HQ and Regional workgroup has developed criteria and a process to solicit new pilot proposals from
        States, and a standard evaluation approach to assess the results of previous  and new State remedy selection
        pilots.  The criteria and process will be communicated to the Regions in a  pending memorandum from the
        director of OERR.

        During FY 99/00, Regions will be working with interested States to review and approve new State remedy-
        selection pilots, to monitor ongoing pilots, and evaluate previous experiences.  This Superfund reform initiative
        will provide important lessons for implementation of a more broadly enhanced role for States and Tribes in the
        Federal Superfund  program.

Encouraging a Customer Orientation

    To provide superior customer service, the following priorities established in FY 98 will continue in FY 99/00:

    •   Enhance service to internal and external EPA Superfund customers,  as well as to Regional customers by
        providing timely, accurate information;
                                                   1-13                                        July 1,1998

-------
OSWER Directive 9200.3-14-1E

    •   Promote effective team performance by mentoring and providing leadership that adapts to the person and the
        situation,  and by providing tools for teams to use in becoming more effective and in solving performance
        problems; and

    •   Enhance the readiness of Regional staff in dealing with emergency situations.

Brownfields

    History
    EPA's Brownfields  Economic Redevelopment Initiative is a comprehensive approach to empower  states,
    communities, and other stakeholders to prevent, assess, safely clean-up, and sustainably reuse brownfields. EPA
    defines brownfields as abandoned, idled, or under-used industrial or commercial facilities where expansion
    or redevelopment is complicated by real or perceived environmental contamination. Through the Brownfields
    Action Agenda announced by EPA Administrator Carol Browner in January 1995, EPA and other federal agencies
    are focusing on clarifying environmental liability and clean-up issues through issuance of Prospective Purchaser
    Agreements and Comfort Status Letters, providing funding for demonstration pilot projects and other search efforts,
    initiating partnerships with key stakeholders, conducting outreach activities, implementing job development and
    training programs, and addressing environmental justice concerns.  The Agency has worked with States, cities,
    Federally recognized Indian Tribes, community representatives, other Federal Agencies, and other stakeholders to
    implement the many commitments made in January 1995. In mid-June, the Agency accomplished  100 percent of
    the commitments with the announcement of the last awards for Brownfields pilots and the signing  of the Soil
    Screening Level guidance. Some of the remaining issues on liability will require a new Superfund law.

    Brownfields Pilots

    As part of the Brownfields Action Agenda, the Agency has awarded  121 Brownfields Assessment Demonstration
    Pilots that are funded through cooperative agreements of up to $200,000 each for a two-year period. Of the 121
    pilots, 64 are national pilots selected and funded through EPA HQ. The Brownfields pilot program is intended to
    provide EPA, states, local governments, and federally recognized Indian tribes with useful information and new
    strategies for promoting a unified approach to environmental assessment, clean-up, and reuse.

    Brownfields National Partnership Action Agenda

    EPA convened an interagency working group of more than 20 Federal departments and agencies to coordinate
    brownfields activities.  The workgroup has developed the National Partnership Action Agenda, which includes
    specific commitments of resources and activities supporting brownfields from EPA and its Federal partners (HUD,
    HHS, DOC, GSA, DOT and others). The National Partnership demonstrates how coordinated action on brownfields
    cleanup and redevelopment at the Federal level an help support efforts at the local level.

    Tax Incentive

    In his January 23, 1996, State of the Union address, the President announced a brownfields tax incentive. Currently,
    tax expenditures that increase the value or extend the useful life of the  property must be capitalized for tax purposes,
    and the costs recovered over the life of the property.  This capitalization treatment contrasts with repair and
    maintenance expenditures, which are generally deducted in the year incurred. The time frame for the deductibility
    of environmental remediation expenditures has long been disputed between taxpayers and the Internal  Revenue
    Service (IRS). In 1994, the IRS passed a ruling that enables current owners to immediately write off environmental
    remediation costs. On August 5,1997, President Clinton signed the new tax incentive into law. It provides the same
July 1, 1998                                        1-14

-------
                                                                           OSWER Directive 9200.3-14-1E
    tax incentive for prospective purchasers, allowing them to "expense" their cleanup costs at brownfields sites over
    a relatively short period of time rather then "capitalize" them over the useful life of the property. The brownfields
    tax incentive sunsets after five years, thereby covering eligible costs incurred or paid from the date of enactment
    until December 31, 1999.   .


Oil

    The Agency shares responsibility with the United States Coast Guard (USCG) and other agencies for implementing
major provisions of the Clean Water Act (CWA) and the Oil Pollution Act of 1990 (OPA).  EPA will work on finalizing
proposed revisions  to the Oil  Pollution Prevention regulation, also known as  the  Spill Prevention, Control,  and
Countermeasure (SPCC) regulation; work with facilities on ensuring compliance with the SPCC regulation; continue the
review, inspection, and approval of facility response plans (FRP); continue the development and improvement of area
contingency plans (ACP) and participation in area drills and other exercises; and respond to oil spills, or direct, monitor
or support others' responses, in accordance with the National Oil and Hazardous Substances Pollution Contingency Plan
(NCP).


I.C SUPERFUND REFORMS (PREVIOUSLY KNOWN AS ADMINISTRATIVE
REFORMS)

    The Superfund program has achieved substantial progress in cleaning up hazardous waste sites and protecting human
health and the environment during its more than 16 year existence.  In addition, there have been serious proposals for
improvement of the program to make it faster, fairer, and more efficient. Since 1993, EPA has launched three rounds
of reforms to Superfund to address criticisms raised by affected parties and to improve the pace, cost, and fairness of the
program. Each set of reforms consists of various initiatives and pilots focusing on changes to the program that can be
implemented within the existing statutory framework.  These reforms were intended to accomplish different goals,
ranging from strengthening of the program prior to reauthorization to testing concepts developed during Congressional
debate on actual legislation. As a result of all the new and continuing reforms, Superfund is a dramatically different
program today than it was at its inception.

    EPA and other Superfund stakeholders have worked since the inception of the program to reduce risks posed by
abandoned and uncontrolled hazardous waste sites. Since 1980, EPA has evaluated more than 40,000 sites, conducted
nearly 5,000 early actions, and completed construction at over 500 of the more than 1,300 sites on the NPL in an effort
to protect human health and the environment.  Much has changed in the Superfund program since 1980. Not only did
SARA produce significant legislative changes, but EPA also instituted a substantial number of administrative changes.

    Since the implementation of Superfund reforms, it has strengthened the program and allowed concepts to be tested
prior to reauthorization. EPA has effectively reduced the pursuit of small volume (i.e., de minimis and de micromis)
contributors by private parties, increased public involvement in the cleanup process by Creating Regional Omibudsmen
to address public concerns, and promoted economic development and environment justice with Brownfields and job-
training initiatives.

    As a 'result, today's Superfund is dramatically different than  it was just five years ago. EPA has streamlined
cleanups, reduced litigation and bureaucracy and made common sense improvements to Superfund.

    On June 23,1993, EPA Administrator Carol Browner announced 17 initiatives aimed at: (1) increasing enforcement
fairness and reducing transaction costs; (2) improving cleanup effectiveness and consistency; (3) expanding meaningful
public involvement; and (4) enhancing the State role in the Superfund program. On September 30, 1994, EPA issued
the "Superfund Administrative Reforms Closeout Report," which identified lessons learned from the first round of
reforms. It also closed out several of the initiatives and identified a group of continuing initiatives to be integrated into
the Superfund program.


                                                   1-15                                        July 1, 1998

-------
OSWER Directive 9200.3-14-1E

In February 1995, EPA announced an additional 12 initiatives designed to improve the Superfund program.  This second
round of reforms encompassed six general areas: enforcement; economic redevelopment; community involvement and
outreach; environmental justice; consistent program implementation; and State and Tribal empowerment.  Many of these
initiatives included pilots that are continuing to furnish information on the operation and changes in the program. The
specific reforms in Round 2 are:

1.    PRP Search Pilots;
2.    Expedited Settlements;
3.    Allocation Process;
4a.   Brownfields Pilot Projects;
4b.   Community Outreach;
4c.   Refining CERCLIS;
4d.   Clarifying NPL Sites;
4e.   Removing Liability Barriers;
5a.   Community Advisory Groups (CAGs);
5b.   Technical Assistance Grants (TAGs);
6.    Community Involvement in the Enforcement Process;
7a.   Training and Health Service Assistance to Communities;
7b.   Job Training and Development;
8.    Guidance for Remedy Selection;
9a.   Risk-Sharing: Implementing Innovative Technology;
9b.   Risk-Sharing: Identifying Obstacles to Using Innovative Technology;
10.   Voluntary Cleanup Program;
11.   Integrated Federal/State/Tribal Site Management Program; and
12.   State/Tribal Superfund Block Funding.

    In October 1995, EPA Administrator Carol Browner announced the third and final round of "Superfund Reforms."
This third round of "common sense" reforms was intended to assist State and local governments, communities, and
industries involved in cleanups to more easily: (1) make cost-effective cleanup choices that protect public health and the
environment; (2) reduce  litigation so more time and money can be spent on cleanup and less on lawyers; and (3) help
communities become more informed and involved so that cleanup decisions make the most sense at the community level.
The specific reforms in Round 3 are:

1 a.   Establish National Remedy Review Board;
Ib.   Establish New Remedy Selection Management Flags ("Rules of Thumb");
2.    Update Remedy Decisions at Select Sites;
3a.   Clarify the Role of Cost in the Remedy Selection Process;
3b.   Directive on National Consistency in Remedy  Selection;
4.    Clarify Information Regarding Remedy Selection Decisions;
5a.   Community Participation in Designing Risk Assessments;
5b.   PRP Performance of Risk Assessments;
6a.   Establish National Criteria on Superfund Risk  Assessments;
6b.   Standardize Risk Assessments;
6c.   Utilize Expert Workgroup on Lead;
7.    Establish Lead Regulator for Federal Facilities;
8.    Consider Response Actions Prior to NPL Listing;
9.    Delete Clean Parcels from the NPL;
lOa.  Promote Risk-Based Priority Setting at Federal Facility Sites;
lOb.  Promote Risk-Based Priority for NPL Sites;
11.   Orphan Share Compensation;
12.   Site Specific Special Accounts;
13.   Equitable Issuance of UAOs;
14.   Revised De Micromis Guidance;
15.   Adopting Private Party Allocation;

July 1, 1998                                       1-16

-------
                                                                            OSWER Directive 9200.3-14-1E

 16.   Reduced Oversight for Capable and Cooperative PRPs;
 17.   Authorize Remedy Selection by States and Tribes;
 18.   Pilot Community-Based Remedy Selection Process;
 19.   Establish Superfund Ombudsman in Every Region; and
 20.   Improve Communication with Superfund Stakeholders.                        ,

    The FY 99/00 priorities for Superfund reforms are: (1) consistent implementation of reform initiatives in HQ and
 the Regions; (2) refinement of the reforms based  on experience to date; and (3) further evaluation of reforms and
 enhanced communication of impacts and results to stakeholders.  EPA will assure nationally consistent implementation
 of the reforms through the following measures: aggressive efforts to assure that program implementers and their managers
 are familiar with each reform; increased understanding of the circumstances giving rise to the reforms; and enhanced
 management accountability based on appropriate  monitoring of results and program accomplishments.  EPA will
 establish mechanisms to share reform experiences from site-to-site and Region-to-Region, as it continues to refine and
 improve the ways the Superfund program is implemented.

    The reforms of the second and third rounds have been implemented at various times over the last four years. For
 many of the reforms, sufficient time has elapsed to involve the Regions and HQ in collecting and evaluating  information
 in FY 99/00. Among other things, EPA will look at. the impact of the reforms on the program. The Agency must assure
 that reforms result in a  more successful program  at the  site level.  EPA HQ and the Regions must effectively
 communicate with stakeholders to increase their understanding of: why the initiatives were developed; what they are
 designed to accomplish; and how they have changed the way we implement the program in communities. [For additional
 information on this topic, please see the Superfund Reform and Measures of Success section of Appendix C (OECA)
 and Appendix G].

 Risk Based Priorities for Contaminated Sites

    EPA considers risk to be a major factor when establishing priorities and allocating resources to contaminated  sites.
 In order to develop this priority-setting system for funding cleanups, the Superfund program has established a National
 Risk-Based Priority Panel for reviewing new start construction activities and for recommending funding strategies for
 Fund-lead response actions based upon the principle of "worst problems first."

    The panel consists of representatives from the  ten Regions and HQ.  Panel  members are chosen  based  upon
 experience and expertise in construction cleanup and resource management.  The panel ranks projects using various
 factors such as human health risk, contaminant stability and characteristics, ecological risk, and program management
 considerations.  Risks  to human population exposed and contaminant stability are given  the greatest weights.  A
 cumulative score is tallied for each construction activity reviewed by the panel, and a prioritized list is  developed for new
 construction activities initiated during the FY. Funds are provided for new cleanup  work during the FY based primarily
 on the project evaluations and recommendations of the National Risk-Based Priority Panel.

National Risk Assessment Criteria

Administrative Reform #6A directed EPA to establish national criteria to plan, report, and review Superfund risk
assessments. The March 1995 Browner Risk Characterization Policy and Guidance Memorandum directed improvement
in the transparency, clarity, consistency, and reasonableness  of risk assessments at EPA.
                                                   1-17                                        July 1,1998

-------
 OSWER Directive 9200.3-14-IE

 Risk Assessment Guidance  for  Superfund (RAGS)	Volume I Human Health Evaluation Manual (Part  D,
 Standardized Planning, Reporting and Review of Superfund Risk Assessments) (Interim) fulfills the Administrative
 Reform #6A mandate and responds to the Risk Characterization Memorandum challenges.
 The RAGS Part D approach consists of three basic elements:

     •    Use of standard tools [includes standardized technical approach for risk assessment (TARA) and standard
         tables];

     •    Continuous involvement  of EPA risk assessors (from scoping through remedial action); and

     •    Electronic data transfer to WasteLAN (the national Superfund data base).

 RAGS Part D benefits include the following:

     •    Interim deliverables increase the likelihood that risk assessments are reasonable, transparent, and acceptable;

     •    Continuous involvement of EPA risk assessors improves consistency between project phases and provides real-
         time review of risk assessment deliverables;

     •    Clarity of standard tables presentation promotes easy use in risk management decision;

     •    Electronic data transfer simplifies WasteLAN data entry;

     •    Easy access to risk information promotes program consistency;

     •    More efficient EPA risk assessor review improves program quality; and

     •    Transparency of risk information facilitates program-level risk management evaluations.

 RAGs Part D is to be implemented in all  applicable Superfund risk assessment planning and development activities
 effective January 1, 1998. Evaluation of the standard tools took place in FY 98, and modifications will be made  as
 necessary in FY 99.

 Regional training was conducted in the spring of FY 98 in all EPA regions for RPMs and risk assessors.
July 1, 1998                                        1-18


-------
                                          OSWER Directive 9200.3-14-IE
 Superfund/Oil Program Implementation Manual FY 99/00





Chapter II: Program Planning and Reporting Requirements
                                                      My 1, 1998

-------
OSWER Directive 9200.3-14-lE
                                       This Page Intentionally
                                             Left Blank
July 1, 1998

-------
                                                                OSWER Directive 9200.3- 1 4- 1 E

                                       Chapter II
                     Program Planning and Reporting Requirements

                                    Table of Contents


CHAPTER II PROGRAM PLANNING AND REPORTING REQUIREMENTS ........................ II- 1

   II.A INTRODUCTION .............................................                    jj.j
   II.B INTEGRATED PLANNING ............................... ............./............ II-l
   II.C INTRODUCTION TO THE SUPERFUND COMPREHENSIVE ACCOMPLISHMENT PLAN .....
   (SCAP) [[[        n_2
   II.D RELATIONSHIP OF SCAP TO OTHER MANAGEMENT TOOLS .......................... II-3

      Management Tools [[[      jj_3
      Superfund Information Systems [[[  jj.g

   II.E OVERVIEW OF THE PLANNING PROCESS (SCAP) ....................................  H-6
       Planning Year
       Operating Year
   ILF CHANGE CONTROL REQUIREMENTS ..........................................      H-7
   II.G HQ/REGIONAL ROLES AND RESPONSIBILITIES  ................. '.'.'.'.'.'.'.'.'.'.'.'.'.'.'.'.'.'.'.'.  II-8

      Maintaining Planning/Accomplishment Data in WasteLAN  .......................... ....     H-8
      Program Evaluation [[[               jj_9

   II.H PROCEDURES FOR ANNUAL TARGET SETTING  ...........                          n- 11
   II.I WORK PLANNING  .......... ........................................ '.'.'.'.'.'.'.'.'.'.'.'.'.  11-11

      Planning Process  [[[  jj.j j
      WasteLAN Reports forPlanning/Target Setting ...........................................  H-12

   II.J REGIONAL ACCOMPLISHMENT REPORTING  ........................................  H-14

      WasteLAN Reports for Accomplishment Reporting  .......................................  H-14

   ILK HQ EVALUATION OF REGIONAL PERFORMANCE ..................................  IMS

      Mid- Year Assessment  [[[  jj_j5
      End-of-Year Assessment [[[  11-16
      Regional Reviews [[[           11-17
      Management Reporting [[[  jj. j7


-------
OSWER Directive 9200.3-14-1E

                                          Chapter II
                      Program Planning and Reporting Requirements

                                      Table of Contents

        Brownfields	  H-20
        Reinventing Site Assessment	  H-21
        Base Closure  	  H-21

    II.N GENERAL WORK PLANNING AND REPORTING REQUIREMENTS	  11-21
        Data Lockout on Historical Accomplishments	'• •  H-21
        Data Validation and Verification	  H-21
        Action Lead Codes	  11-22
        Lead Changes	• • • •  H-24
        Action Qualifiers for Screening and Assessment Actions  	  11-25
        Record of Decision (ROD) 	  H-26

           Non-Significant Changes 	  11-26
           Significant Changes to a Component of a Remedy	  11-27
           Fundamental Changes to the ROD  	  H-27
           RODs Requiring No Physical Construction	  11-27

        Anomalies and Phased Projects	  II-28
 July 1, 1998

-------
                                                             OSWER Directive 9200.3-14-1 E


                                      Chapter II
                    Program Planning and Reporting Requirements

                                    List of Exhibits

EXHIBIT II.l FLEXIBILITY SCALE FOR BUDGETING/PLANNING	 II-4

EXHIBIT II.2 HQ/REGIONAL INTEGRATED PLANNING RESPONSIBILITIES	 II-5

EXHIBIT II.3 HQ/REGIONAL SCAP AND WasteLAN RESPONSIBILITIES	 H-8

EXHIBIT II.4 EVALUATION RESPONSIBILITIES	,n-10

EXHIBITII.5 PROCEDURES FOR ANNUAL TARGET SETTING  			 H-13

EXHIBIT II.6 SCAP PLANNING/TARGET SETTING WasteLAN REPORTS	 11-14

EXHIBIT II.l PROGRAM EVALUATION WasteLAN REPORTS	  .... 11-15

EXHIBIT II.8 THE REGIONAL EVALUATION PROCESS	'....'	 H-16

EXHIBIT II.9 CFO PERFORMANCE MEASURES	  11-19

EXHIBIT 11.10 ACTION LEAD CODES IN WasteLAN	 H-23

EXHIBIT II.l 1 CODING OFTAKEOVERS	 H-25

EXHIBIT 11.12 REMEDIAL EVENTS, ANOMALIES, AND PROJECT PHASING	 11-29
                                                                            My 1, 1998

-------
OSWER Directive 9200.3-14-lE
                                        This Page Intentionally
                                              Left Blank
 July 1, 1998

-------
                                                                           OSWER Directive 9200.3-.14-1E

                                             CHAPTER II
               PROGRAM PLANNING AND REPORTING REQUIREMENTS

II.A INTRODUCTION

    The Government Performance and Results Act (GPRA) formalizes the process by which the Agency plans.  It
focuses the Agency on planning strategically, developing goals that are outcome-focused, consulting with both internal
and external customers when developing the Agency's strategic plan, and developing performance plans that look toward
intended results, not just inputs and outputs.

    The Office .of Emergency and Remedial Response (OERR), Office of Site Remediation Enforcement (OSRE), the
Federal Facilities Enforcement Office (FFEO), the Federal Facilities Restoration and Reuse Office (FFRRO), and the
Outreach and Special Project Staff (OSPS) are responsible for overall program planning, including implementing the
requirements of GPRA and reporting on Superfund  program accomplishments. The Superfund Comprehensive
Accomplishments Plan (SCAP) is the process by which the Assistant Administrator for the Office of Solid Waste and
Emergency Response (AA SWER), Assistant Administrator for the Office of Enforcement and Compliance Assistance
(AA OECA) and senior Superfund  managers monitor progress towards meeting the GPRA targets and annual
performance goals. In addition, SCAP will continue to be used as an management tool to project and track activities
that contribute to these GPRA goals and support resource allocation.  Regions should continue to plan and  report
accomplishments in WasteLAN as they have done traditionally.

    To more clearly reflect the  relationship between GPRA and the SCAP process, targets (GPRA targets/annual
performance goals) and measures (GPRA and program measures) are defined'as follows:

•   GPRA Targets/Annual Performance Goals are a subset of the overall planning and budgeting information that has
    traditionally been tracked by the Superfund program offices. They are numerical  goals that are established nationally
    prior to the start of the operating year; for example,  136 construction completions at Superfund National Priorities
    List (NPL) sites in FY 99.

•   Measures are activities deemed  essential to tracking overall program progress; there are no externally reported
    numerical goals or estimates associated with measures.  There are two types  of measures: GPRA measures and
    program measures.  GPRA measures simply track the  number  of actions that occur throughout the year
    (accomplishments) and are used to evaluate program progress; for example, the number of agreements negotiated
    with States and Tribes. Program measures are used to project the number of events and activities that each Region
    expects to perform during the year using anticipated resources; for example, the  number of sites where EPA settled
    based on ability-to-pay determinations.

    Successful planning requires the reflection and accurate costing of program priorities in the budget and workload
model, and translation of the priorities and resource requirements into specific output commitments via the SCAP.
Candid evaluation of performance against these commitments is essential to assess the viability of program priorities,
resource requirements and overall program effectiveness.
ILB INTEGRATED PLANNING

    Integrated planning is the responsibility of HQ and Regional program offices; Regional finance offices; the States;
Tribes; and affected communities; the Office of Regional Counsel (ORC); DOJ; and other Federal agencies. Information
on planned activities should also be coordinated  with,the Natural Resources Trustees and the Agency for Toxic
Substances and Disease Registry (ATSDR).  To provide adequate resources to achieve Superfund's GPRA objectives
and subobjectives,  HQ allocates resources within and between the site assessment, response, enforcement, Federal
facilities and Brownfields programs.  Regions are responsible for providing data on the level of resources needed to
accomplish those priority activities and negotiate commitments consistent with realistic site planning.  Regions should


                                                  II-1                                       July 1, 1998

-------
OSWER Directive 9200.3-14- IE

not accept targets that require completion of activities that cannot be funded or staffed within the resources provided.
This requires Regions to reconcile FY  99/00 targets and their Superfund pipeline with the financial operating plan
proposed by HQ.

    Flexibility is greatest in the budget planning years. Realistic outyear planning data (milestones and funding needs)
allows HQ to prepare requests for resources based on Regional needs. Exhibit II. 1 summarizes levels of flexibility as
the operating year is entered. Major phases in the decision making continuum include:

•   Formulation of the outyear GPRA annual performance plan and budget occurs 12 to 18 months prior to the FY.
    The GPRA annual performance plan includes objective, results-oriented, quantifiable and measurable performance
    goals; resources necessary to meet goals; performance indicators to assess outputs, services, and outcomes; and
    verification and validation procedures. Development of the budget includes identification of major program issues,
    analysis of program costs, and alignment of resources among competing priorities. The budget will be based upon
    (1) the President's budget, (2) Regional WasteLAN planning data, and (3) GPRA annual performance targets and
    the ability of a Region to contribute to the program's targets.  Activities receive resource allocations that are
    established by the Administrator and the Assistant Administrator for the Office of Solid Waste and Emergency
    Response (AA SWER) or the Assistant Administrator for the Office of Enforcement and Compliance Assurance (AA
    OECA). These allocations balance the needs of the Superfund program with the needs of other Agency programs.

•   Development of the initial operating plan occurs six months prior to  the FY and is finalized before the start of the
    FY. The proposed response, Federal facilities, and enforcement operating plans are developed based on the average
    amount of money obligated/tasked by the Region in each of the AOA categories during the current year, regional
    projections for the upcoming years and considering prior year expenditures.  OSWER and OECA negotiate the final
    operating plan based on Regional response to the initial operating plan, the Regional  pipeline, past  Regional
    accomplishments and planned durations/dollars, Regional requests for the budget reserve, and associated GPRA
    targets/annual performance goal commitments.  OSWER and OECA provide resources  to support the program
    through the Advice of Allowance (AOA) and workload process. Regions are expected to work within the annual
    Regional budgets established at the start of the year until the mid-year evaluation. Regions have flexibility within
    the general budget and AOA structure to shift funds as needed to meet  priority activities. (See Chapter III for
    additional information on shifting funds.) Once the operating plan is  established at the start of the year, additional
    resources generally can be shifted to a Region only at the expense of resources from other Regions. However, HQ
    may shift funds among the Regions depending on the level of use and need.

•   Use of the mid-year evaluation to realign resources in  the current FY. Current year resource adjustments focus on
    changes needed due to cost and project schedule modifications.  Changes may result in shifts within program areas
    and among Regions, and revised annual funding levels. Estimates developed in April/May for the upcoming FY
    represent the first formal  opportunity for changing resources among program areas at a national level. The revised
    resource estimates also serve as  a "baseline" for examining program needs in the budget year.

Exhibit II.2 describes the information flow and HQ and Regional responsibilities associated with integrated planning.
ILC INTRODUCTION TO THE SUPERFUND COMPREHENSIVE ACCOMPLISHMENT
PLAN (SCAP)

    The SCAP process is used by the Superfund program to plan, budget, track, and evaluate progress toward achieving
Superfund GPRA objectives and subobjectives.  The SCAP planning process is a dynamic, ongoing effort that has a
significant impact on Superfund resource allocation and program evaluation.  Planned obligations and reporting of GPRA
targets/annual performance goals and measures are generated through SCAP and influence the Superfund budget and
evaluation process.  Such planning is a day-to-day responsibility of the Regions. An annual process has been established
through which HQ and Regions formally develop work plans for the future.  WasteLAN serves as the conduit for the
SCAP process by providing both HQ and Regions with direct access to the same data. With the implementation of the
ne%v WasteLAN system, reports can be produced allowing for daily interactive updates of planning and site cleanup
progress information.

July 1, 1998                                        II-2

-------
                                                                           OSWER Directive 9200.3-14-1E

II.D RELATIONSHIP OF SCAP TO OTHER MANAGEMENT TOOLS

    The SCAP process is crucial to Superfund program planning, tracking, and evaluation. As the Superfund program's
central planning mechanism, it is interrelated with all Agency and Superfund program specific planning and management
systems, including the GPRA annual performance plan, the Superfund budget, Agency Operating Plan, Memorandum
of Agreement/Management Agreements and the Superfund workload models.  GPRA targets/annual performance goals
are designed to reflect the strategic plans and the Agency's goals, objectives, and subobjectives for the upcoming year
and, as such, is the Superfund Program's Memorandum of Agreement. In some cases, newcategories are developed, or
the projections for activities are adjusted, to match these goals.

Management Tools

    Most of the Superfund program's budget is based on planning and accomplishment data recorded in WasteLAN.
The operating year's budget is developed 18 months prior to its beginning. For example, data existing in the third quarter
of FY 99 will be used to formulate the FY 2001 budget. The site schedules reflected in SCAP serve as the foundation
for determining outyear budget priorities, such as the dollar levels to be requested in the budget and the total level of
FTEs to be made available for distribution.  Because dollars for Fund-financed .remedial actions , and RDs dominate
the overall Superfund budget,  it is critical that the Regions identify RD, and remedial action candidates and projected
funding needs. Cost estimates for remedial actions should be derived using the draft FS or ROD estimates. Brownfields
budgets are based on decisions during selection of pilot sites. Progress tracking of the Brownfields program is being led
by the Institute for Responsible Management (IRM) with support from individual Regions.

    The Superfund budget provides the basis for the Agency Operating Plan. The preliminary Operating Plan, which
is finalized prior to the FY, establishes the funds available to the Regions for performing Superfund work.  (The final
Operating Plan is established following Congressional approval). Enforcement operating plans are
-------
OSWER Directive 9200.3-14-IE
                                      EXHIBIT II.l
                     FLEXIBILITY SCALE FOR BUDGETING/PLANNING
• '•',-4'^: :"-:- •• '" ' / '
«- Minimum Maximum """*•
Operating Year Budget
(FY99 )
1. Operating Plan establishes funding
ceiling ( 98/4)
1 . Semi-annual targets are set -
Targets can be changed only through a
written request from the Regional
Division Director to the OERR or
OECA, FFRRO, or OSPS Office
Directors.
1 . Pricing factors are set - Cannot
change pricing on actions
1 . Additional funds can only be
obtained through special requests
1 . Regions have flexibility within
general budget and AOA structure to
shift funds to meet priority activities
1 . Mid- Year evaluation used to
realign current year resources
1 . Flexibility on dollars much greater
than FTEs through Regional
reprogramming
1 . Resources for response actions will
be funded based on the Priority Panel
decisions
Planning Year Budget " ,,
(FY 00 ) ~'
2. Development of Operating Plan
begins 6 Months Prior to FY and is
based on prior years obligations and
Regional projections for the upcoming
years (Begins 99/2)
2. Regional GPRA targets/annual
performance goals finalized in
September
2. Pricing factors can be changed
through Regional/HQ consensus
2. The budget is set but there is more
leeway to make adjustments based on
proven need
2. Regions request funds to meet
GPRA annual performance and
Regional pipeline goals
2. Final GPRA targets/annual
performance goals set final resource
levels (99/4)
2. Flexibility on dollars and FTE may
be constrained by President's budget
and/or appropriated levels.
2. Candidate sites are identified for
the Priority Panel
Outyear Budget
(FY2001)
3. Formulations Begins 12-18 months
prior to FY; largely dependent on
Regional planning data in WasteLAN
(Begins 99/3)
3. National targets are setbased on
schedules and estimated costs for
program activities, which drive budget
request
3. Pricing factors are subject to
review
3. Budget is constrained based on
resources cap imposed by A A and
Administrator unless exception can be
justified
3. Maximum flexibility to design
budget to optimize cross-program
priorities
3. N/A
3. N/A
3. N/A
July 1, 1998
II-4

-------
                                                                               OSWER Directive 9200.3-14-1E
                                                EXHIBIT II.2
                     HQ/REGIONAL INTEGRATED PLANNING RESPONSIBILITIES
               Regional Responsibilities
  Manage projects to integrate Enforcement and Fund
  milestones and to ensure schedules and timelines are met

  Involve the State, ORC, and finance offices in the planning
  process

  Provide accurate, complete, and timely project planning data
  in WasteLAN

  Follow established planning procedures and requirements so
  that HQ has a common basis with which to evaluate Regional
  proposals (See Chapter III and the Appendices)

  Assess Federal agencies environmental projects identified as
  part of the Office of Management and Budget (OMB)
  Circular A-l 1 process and the Federal  Agency
  Environmental Management Program Planning Guidance
  (FEDPLAN).

  Identify multi-media planning and cleanup opportunities

  Recognize that missed commitments severely impact
  resource availability

  Identify potential unused funds and return them to HQ within
  reasonable timeframe for redistribution
                HQ Responsibilities
Establish a combined Fund, Enforcement, Federal facilities,
and Brownfields hierarchy of program priorities in
consultation with the Regions to be used in workplanning
and adjustment of targets

Review integrated operating plans and site commitments
proposed by the Regions prior to workplanning

Coordinate OSWER, OECA, DOJ, Financial Management
Division (FMD), and the Office of Administration and
Resources Management (OARM) activities throughout the
planning process

Work with Regional managers to formulate preliminary
resource requests and determine how resources should be
adjusted to meet program priorities

Communicate with the Regions on changes/additions to
schedules

Provide funding consistent with each Region's active
pipeline phases, shifting Regional resources if needed to
support priority activities

Develop policy and guidance in response to Congressional or
Agency initiatives
    In FY 99/00, each Region's FTE distribution continues to be frozen at the FY 90 distribution ratio. While the freeze
ensures that the total Regional Superfund resources are not affected, shifting of resources within the Region among the
different program areas to support Agency/Regional program priorities may occur. This includes shifts between the
response and enforcement programs. All shifts will be based on the national budget (see Chapter III) and program
priorities (see  Chapter I).  [Note:  Shifts  between program  elements  (fields) in excess  of $500,000 requires
Congressional approval.]

    Executive Order 12088, Federal Compliance with Pollution Control Standards, directs the head of each executive
agency to ensure that all necessary actions are taken for the prevention, control, and abatement of environmental pollution
with respect to all facilities and activities under control of the agency. The Executive Order directs that an annual plan
be developed and submitted to the EPA Administrator and specifies that in preparing its plan, each executive agency will
ensure that the plan provides for compliance with all applicable pollution control standards.  The Federal Agency
Environmental  Management Program Planning Guidance  (FEDPLAN)  is a major compliance assistance tool that
implements the Executive Order, and is used to identify, track, and report environmental projects that will enable an
agency to meet existing requirements or correct identified compliance problems. OMB Circular A-l 1 further requires
that estimates for design and construction of Federal  facilities or remedial environmental projects be submitted (for
funding) only after consultation with EPA. EPA will then review each agency's pollution abatement plan during a formal
update cycle, using newly designed computer software called FEDPLAN-PC, that provides direct feedback  to each
Federal agency.
                                                     II-5
                                         July 1, 1998

-------
OSWER Directive 9200.3-14-1E

Superfund Information Systems

    Effective management of the Superfund program requires the availability of accurate information on Superfund sites
throughout the country.  CERCLIS was developed in the mid-1980s as an integrated system to hold national site
assessment, remedial, removal, enforcement, and financial information. In FY 97, all Regions began using the third
generation of CERCLIS, now called WasteLAN, to record Superfund planning and accomplishment information. (See
Appendix E for more information on WasteLAN.)


ILE OVERVIEW OF THE  PLANNING PROCESS (SCAP)

The SCAP process generates data that fulfill the following functions:

•   Tracking of accomplishments against GPRA targets/annual performance goals and measures;

•   Updating planning assumptions (schedules and funds) for the current FY;

•   Developing planning data for the upcoming FY; and

•   Providing data for outyear budget planning purposes.

    In FY 98, the SCAP planning process resumed a semi-annual work planning schedule.  The cycle begins in late
March/April with a review of program progress and ends with a formal work planning session in August/September.
Therefore, it is essential that planning and accomplishment data in WasteLAN remain current and up-to-date throughout
the year and accomplishments be reported as soon as they occur.  Site schedules and financial planning information
should be reviewed and updated on an ongoing basis (at a minimum on a monthly basis).

Following is a summary of the SCAP planning cycle for non-Federal facilities:

Planning Year

•   Mid-May/ June - Regions continue their site planning using WasteLAN.  The Regions should focus on their
    individual pipeline, the overall goals and priorities of the program as identified in the GPRA annual performance
    plan, and how they can achieve their portion of the national effort given proposed resources. In June, HQ issues
    a Call Memorandum that outlines the FY work planning process and the procedures for preparation for the upcoming
    work planning sessions.  The memorandum will  include the finalized AOA structure, GPRA annual program
    performance targets, and procedures to be used for developing the upcoming year's operating plan.

•   July- HQ pulls the current fiscal year actuals and planning data for the next two FYs from WasteLAN on the fifth
    working day  in July. In developing the FY operating plan (base budget), HQ will review current and upcoming
    years' financial planning data as well as historical obligation trends. Funding needs will be totaled in each of the
    AOAs.

    Regions can assume in FY 99 that their removal budget will be held at the same level as FY 98 and is unaffected
    by this proposal. Also, funding for anew start and on-going remedial actions will be unaffected by this proposal.

    HQ will review the funds requested for the activities falling under the Pipeline Operations AOA and then calculate
    the percentage of funds that each Regions is requesting compared to the total Pipeline Operations AOA. HQ will
    allocate 60 percent of these funds to the Regions [i.e., if a Region was to receive $30 million as their percentage of
    the Pipeline Operations AOA, $18 million (60 percent)  would be allocated as part of the base budget.] Each
    Region's base budget will consist of the funds from 1)  the straight-lined  Removal AOA based on the FY 98
    allocation and 2) 60 percent of its portion of the Pipeline Operations AOA.
    To develop targets and allocate the remaining funds for the Pipeline Operations AOA, HQ will conduct regional


July 1, 1998                                        II-6

-------
                                                                            OSWER Directive 9200.3-14-IE

    OU-specific pipeline analyses (upcoming year and one year out) and a historical trends analysis. The analyses will
    include a review of historical performance trends, a comparison of regional-specific targets to the national annual
    response program performance targets (e.g., 136 construction completions in FY 99), and a projection of resources
    needed to meet these targets. The results of the analyses will be used by the Regional Center Coordinators and the
    Planning,  Analysis  and Resources Management Center  (PARM) when conducting regional work planning
    negotiations as a tool to assess regional-specific target levels. The allocation of the remaining funds for the Pipeline
    Operations AOA (i.e., the remaining 40 percent) will be allocated based on the ability of a Region to contribute to
    the GPRA response program performance targets for FY 99.  The Superfund Federal facilities response program
    will conduct a similar analysis and share the results with the Regional Superfund Federal Facility Program Managers.

•   September- Regional work planning sessions will establish Regional budgets and targets (mid-year and end-of-
    year) and the operating plan (base budget plus increment) for the fiscal year.         ;

•   October - HQ will meet with the  Division .Directors to discuss the FY 99 regional-specific commitments and
    allocation of regional funds based on the national GPRA annual program performance targets. The Superfund
    Federal Facilities Response Program will issue a memo that outlines regional commitments and allocation of funds
    to both  the Division Directors and the Superfund Federal Facility Program Manager.

Operating Year

•   November - Enforcement extramural budget carryover amounts are calculated and the FY Regional enforcement
    budget  allocation is finalized. Regions revise their final targets based on commitments that were not met the
    previous year.                                                        •'       • .             .

•   April/May - At .mid-year, HQ and the Regions will discuss regional progress in achieving negotiated targets and
    regional budget utilization (obligation rates).  Based on these discussions, remaining funds will be allocated to the
    Regions to assure program targets are achieved. In some cases, this may involve a, realtocation and shifting of
    resources  among Regions. HQ will distribute up to 20% of the remaining funds at mid-year.

•   June - Prior to distributing the fourth quarter AOA, HQ will review WasteLAN target and accomplishment .data
    and regional obligation rates to assure national program targets are being achieved.

    Regions are required to manage their funds and operate within the annual budgets established. Non-RA funds within
the Region's budget must be reprogrammed to meet unexpected needs.


II. F CHANGE CONTROL REQUIREMENTS

    Stability  in the SCAP process through the year is essential to the success of  planning  and  accomplishment
 reporting/evaluation procedures. The following procedures are used to control changes to  items in SCAP:

 •   Changes (including additions or deletions) to targets, measures, definitions, methodologies, planning processes,
    accomplishment reporting, financial management, or any other process described in this Manual must be presented
    by the  Office Director for the program office proposing the  change, and receive the comments/concurrence Of
    OSRE, OERR, FFRRO, OSPS, andFFEO;                 '                  ,

 •   All proposed changes must be sent to the Regions and all other program offices for review and comment prior to
    implementation; and

 •   The decision on whether to proceed with the proposed change must be documented in writing. Copies of all final
    decisions should be provided to all program offices and Regions. If the proposed change will be implemented, an
    addendum to the Superfund Program Implementation Manual may be issued.
                                                    II-7                                        July 1, 1998

-------
 OSWER Directive 9200.3-14-1E


 ILG HQ/REGIONAL ROLES AND RESPONSIBILITIES


 Maintaining Planning/Accomplishment Data in WasteLAN


     Exhibit II.3 describes the HQ/Regional responsibilities for maintaining planning and accomplishment data in
     WasteLAN.


     The Information Management Coordinator (IMC) is a senior position which serves as Regional lead for all
 Superfund program andWasteLAN systems management activities.  The following lead responsibilities for Regional
 program planning and management rest with the IMC:


 •   Coordinate program planning, development, and reporting activities;


 •   Ensure Regional  planning and accomplishments are complete, current, and consistent, and accurately reflected in
     WasteLAN by working with data sponsors and data owners;


 •   Provide liaison to HQ on SCAP process and program evaluation issues;


 •   Coordinate Regional evaluations by HQ; and


 •   Ensure that the quality of WasteLAN data is such that accomplishments and planning data can  be accurately
     retrieved from the system.


                                               EXHIBIT II.3
   	HQ/REGIONAL SCAP AND WASTELAN RESPONSIBILITIES	
               Regional Responsibilities
  Planning and scheduling all actions from site assessment
  and PRP search through NPL deletion

  Keeping planning and ao^mplishment data in WasteLAN
  up to date, including updating site schedules established at
  the ESI/RI stage and cost estimates forremedial actions when
  better planning data become available

  Reporting accomplishments in WasteLAN as they occur

  Entering and maintaining quarterly planning, budget, and
  accomplishment reporting for non-site specific activities

  Preparing change requests

  Tracking and maintaining the enforcement extramural budget
  and the Federal facilities budget
                   HQ Responsibilities
    Negotiating final GPRA targets/annual performance goals

    Entering the final budget into WasteLAN

    Determining the AOA based on planned activities in
    WasteLAN

    Entering and maintaining AOA data in WasteLAN

    Responding to Regional requests for changes in plans
    through the change requests process

    Utilizing WasteLAN to obtain , budget and other Superfund
    site information to respond to special requests for
    information and planning data

    Communicating with Regions and HQ offices regarding
    changes in budget, SCAP process, Superfund/Oil Program
    Implementation Manual, and other program guidance that
    will impactWasteLAN, and subsequently implementing these
    changes in WasteLAN
    The Budget Coordinator serves as the Regional lead for all Superfund program resource activities. The Budget
Coordinator:


•   Coordinates the planning, development and reporting of resources;


•   Coordinates the planning and execution of Regional priorities;


•   Communicates and implements national and Regional Superfund budget policies;
July 1, 1998
H-8

-------
                                                                            OSWER Directive 9200.3-14-IE

•   Helps IMC to ensure Regional resources associated with accomplishments are complete, current, and consistent,
    and accurately reflected in WasteLAN; and

•   Provides liason to HQ on program issues.

    With the implementation of the the new WasteLAN,, two new roles, Data Sponsor and Data Owners, were identified
for improving the quality of data stored in WasteLAN. Data Sponsors include the Senior Process Managers or program
offices in HQ. Both HQ and the Regions are Data Owners. Following are the responsibilities assigned to each of these
roles:

•   Data sponsors

        Identify data needs;

        Oversee the process of entering data into the system;

        Use data for reporting purposes;

        Conduct focus studies of the data entered;

        Provide definitions for data elements;

        Promote consistency across the Superfund program;

        Initiate changes in WasteLAN as the program changes;

        Provide guidance requiring submittal of these data; and

        Support the development of requirements for electronic data submission.

•   Data owners

        Enter and maintain data in WasteLAN; and

        Assume responsibility fojr complete, current, consistent, and accurate data.

Program Evaluation

    HQ and the Regions have different roles and responsibilities in Superfund program evaluation and management, as
shown in Exhibit II.4.
                                                   II-9                                        July 1, 1998

-------
OSWER Directive 9200.3-14-1E
                                                EXHIBIT II.4
                                    EVALUATION RESPONSIBILITIES
               Regional Responsibilities
  Meet semi-annual program targets and solve performance
  problems when they arise

  Provide quarterly accomplishment and planning data to HQ
  through WasteLAN

  Maintain WasteLAN data quality at high levels for
  Superfund program and project management

  Negotiate performance standards that provide individual
  accountability for targets

  Assess Federal agency needs identified during the
  FEDPLAN and OMB Circular A-l 1  processes

  Participate in the Regional reviews
                    HQ Responsibilities
    Provide guidance to the Regions for the quarterly reporting,
    the mid-year assessment, the year-end assessment, and
    Regional reviews

    Implement and report on follow-up action items from the
    Superfund mid-year assessment and Regional reviews

    Review performance data reported by the Regions and assist
    Regions having difficulties in meeting targets

    Conduct Regional reviews

    Continually assess program performance and analyze
    timeliness and quality of work

    Recommend resource reallocation based on Regional needs
    and performance

    Assure that all staff are informed of results of performance
    reporting

    Compare Federal agency budget authorities, obligations, and
    outlays to monitor cleanup activities
The Superfund evaluation process provides managers with an opportunity to meet program objectives by:

•   Examining program accomplishments;

•   Analyzing and discussing issues that affect the successful operation of the Superfund program; and

•   Initiating changes in program operations or reallocating/redirecting resources.

The strategy for assessing the performance of the Superfund program is comprised of the following:

•   Establishing semi-annual and annual targets and planning measures;

•   Quarterly reporting of response and enforcement/program accomplishments and planning measures based on
    WasteLAN data;

•   Semi-annual reporting of response reporting and Federal facility accomplishments based on WasteLAN data;

•   Quarterly evaluation of enforcement accomplishments against measures;

•   Semi-annual performance evaluation; and

•   Regional reviews.


    This strategy enables management to recognize high performance, concentrate Superfund resources in those Regions
July 1, 1998
11-10

-------
                                                                            OSWER Directive 9200.3-14-1E

that demonstrate success, and provide training and technical assistance to those Regions that are experiencing difficulties.

    In addition to the program management and assessment tools traditionally used by OSWER, Executive  12088,
Federal Compliance and Pollution Control Standards, is applied to ensure that all necessary actions are taken for the
prevention, control and abatement of environmental pollution associated with all facilities and activities under the control
of every executive agency.  The  Executive Order requires the development of an annual plan, that provides for
compliance with all applicable pollution control standards. The FEDPLAN is the tool that is used to identify, track and
report on these environmental projects.


II.H PROCEDURES FOR ANNUAL TARGET SETTING

    The process for developing GPRA targets/annual performance goals and measures for a FY begins with the strategic
plan. Annual national performance goals are established to support the program's strategic plan and provide the basis
for outyear budget requests.  All regional targets/measures are established in August/September only after work planning
sessions with OERR, OSRE, FFRRO, FFEO, and the Regions.  In the Regions, a joint review of commitments should
be undertaken by the program office and ORC.  The dates for pulling WasteLAN data that will be used in developing
the proposed Regional operating plan, generating the Regional workload and budget, and work planning can be found
in the Manager's Schedule of Significant Events presented at the beginning of this Manual.

    The Region's focus in work planning should be on its individual pipeline (i.e., more site assessments or more
construction completion oriented), the overall goals and priorities of the program including GPRA objectives and
subobjectives, and how it can achieve its portion of the national effort given proposed resources. HQ compares Regional
plans with program goals and resource allocations.  In addition, HQ reviews past Regional accomplishments,  historical
obligation trends, and planned durations/dollars to ensure that the Region is planning the appropriate amount of work
given the dollars it is requesting. This provides HQ with a benchmark going into work planning on what the Region
should be able to accomplish based on its unique pipeline status.


//./  WORK PLANNING

    Regions are required to keep the planning and accomplishmentdata in WasteLAN current, complete, consistent, and
accurate. Changes in planning information (schedules and funds) should be entered into WasteLAN within five days
after the data owner [e.g., Remedial Project Manager (RPM)/On-Scene Coordinator (OSC)/Site Assessment Manager
(SAM)] are aware of the need for the change.                  ;       .             <                   .

Planning Process                                                            •

    Exhibit II.6 outlines the steps a Region  must go through as part of its work planning responsibilities.

    As a final check to ensure that planning data are current, complete, consistent, and accurate, Regions should
routinely generate  SCAP and Audit reports.  At an absolute minimum, reports  should be generated prior to HQ
development of the proposed operating plan and in late June for internal review of the planning data in WasteLAN.
These planning data should reflect any adjustments  made to the annual plan.

    As designated,  HQ pulls SCAP reports from WasteLAN.  The data  in these  reports serve as the basis for
HQ/Regional work planning. HQ  will perform all work planning sessions based on the information in WasteLAN on
these pull dates.

    WasteLAN data quality problems that affect the SCAP report update shall be resolved prior to the work planning
meetings.  These problems are to be resolved on a Region-specific basis through telephone calls between HQ and the
IMC or program manager.
WasteLAN Reports forPIanning/Target Setting


                                                   11-11                                       July 1, 1998

-------
 OSWER Directive 9200.3-14-1E


     Exhibit II.6 presents the WasteLAN reports used by HQ and the Regions in the establishment of Regional
 targets/measures. Following is a description of these reports:

 •   The Site Summary Report (SCAP-02) is used by EPA to display enforcement sensitive WasteLAN data for NPL and
     non-NPL sites.

 •   The SCAP Response Financial Report (SCAP-04R),  Federal Facility Financial Summary (SCAP-04F), and
     Enforcement Financial Summary (SCAP-04E) aggregate dollars by program area and provide both site-specific and
     non-site specific backup from WasteLAN. These reports should be used to compare the funding requests with the
     Regional budgets.

 •   The OP A Measures Report (SCAP-08) is used by EPA for tracking estimates and accomplishments for reporting
     progress made toward achieving program goals under the Oil Pollution Act (OPA).

 •   The Site Assessment Report (SCAP-13)  is used by EPA for reporting estimates, plans, and accomplishments for
     SCAP measures. The information provided by this report is used in conjunction with the SCAP-14 and SCAP-18
     reports to encompass the entire range of targets and measures.

 •   The Superfund Accomplishments Report (SCAP-14 and 14F) is used by EPA to track targeting, planning, and
     accomplishment actions in support of the response and Federal facility programs.

 •   The GPRA Report (SCAP-15) is used by EPA to track GPRA performance goals and measures.

 •   The Response Budget Control Report (SCAP-21) and Financial Report for Enforcement (SCAP-21E) are similar
     to the SCAP-04R and SCAP-04E. They are used by the Regions to track and balance their fiscal year budgets and
     by HQ to issue the quarterly Advice Of Allowance (AOA).  The report calculates the difference between each
     Region's current planned budget and its negotiated budget for each line item category.  The report also calculates
     the AOA against the amount of funds actually obligated (including open commitments).

 •   The SOL Management Report (ENFR-17)  identifies planned and actual completion  dates and obligations for
     response activities to assist in calculating the cost recovery  Statute of Limitation (SOL).
July 1, 1998                                      11-12

-------
                                          OSWER Directive 9200.3-14-1E
               EXHIBIT II.5
PROCEDURES FOR FY 99 TARGET SETTING
' ' ,~£*
r ' Month
March/April
April/May
May/June
July
August/September
September/October
November
•:.'-, Regional Ftesporisibilitles , ,!* 'jK £
, »^ , h *~^ * ^ >- -,?• •> V .<;

Consult with States and ORC on FY activities
Update site schedules and funding needs based
on plan, Regional pipeline, and national goals
and priorities
Identify primary candidates for each
target/measure activity by checking the target
icon box on the Regional Planning screen.
• Primary projects have the greatest
likelihood of meeting schedules and are
used to determine SCAP commitments.
Participate in HQ conference calls on analysis of
Regional plan
Enter proposed commitments for work planning.
Primary candidate counts become the basis for
committments once target lockout is selected.
These counts can be modified and non site
specific target/measure activity counts can be
added via the Regional Planning
estimates/targets screen.
Participate in work planning sessions to
establish final targets/measures and budget.
Update primary candidate designations and
budget data as necessary based on results of
work planning sessions.
Participate in one day national Division Director
meeting to communicate commitments and
allocation of Regional funds based on national
GPRA commitments
Revise targets during open season based on
appropriations
.^ •<&; '^Iwlle^njbili^s -.fr'';;!
Distribute draft SPIM for review and comment
Prepare program and enforcement Regional
operating plan based on average Regional
obligations/tasking in the current year, projections
for the upcoming years, and considering prior
year expenditures.
Analyze Regional pipelines
Issue Call Memorandum outlining work planning
process and procedures for work planning
sessions
Review Regional plans in WasteLAN and
pipeline workload and budget
Review past Regional accomplishments and
planned durations/dollars
Review Regional requests for budget reserve
Conduct Regional conference calls on the results
of the analyses
Participate in work planning sessions to establish
final targets/measures and budget
Send targets/measures and Regional budgets to
AAs for approval
Participate in one day national Division Director
meeting to communicate commitments and
allocation of Regional funds based on national
GPRA commitments
Revise Regional Enforcement operating plans
                    11-13
July 1, 1998

-------
 OSWER Directive 9200.3-14-1E
                                             EXHIBIT H.6
                         PLANNING/TARGET SETTING WASTELAN REPORTS
         SCAP-2:
         SCAP-4E:
         SCAP-4F:
         SCAP-4R:
         SCAP-08:
         SCAP-13:
         SCAP-14/14 F:
         SCAP-15:
         SCAP-21:
         SCAP-21E:
         ENFR-17:
Site Summary Report
Enforcement Financial Summary
Federal Facility Financial Summary
SCAP Response Financial Report
OPA Measures Report
Site Assessment Report
Superfund Accomplishments Report
GPRA Report
Response Budget Control Report
Financial Report for Enforcement
SOL Management Report
//./ REGIONAL ACCOMPLISHMENT REPORTING

     Accomplishments data are entered into WasteLAN by the IMC, RPM, OSC, SAM, or other designated program staff
(i.e., PRP search, cost recovery).  Data on accomplishments should be entered into WasteLAN within five working days
of the action occurring. Only accomplishments correctly reported in WasteLAN will be recognized by HQ. If a
Region feels that it has correctly recorded an accomplishment that is not showing in the Superfund Accomplishments
Report (SCAP-14), the GPRA Report (SCAP-15), or Site Assessment Report (SCAP-13), please contact the appropriate
HQ office.

     Regions should perform data quality checks and make adjustments to WasteLAN if the data base does not reflect
actual accomplishments. In any event, Regions need to be sure the information reflected in WasteLAN is up-to-date and
accurate.

     Preliminary end-of-year accomplishments will be pulled on the fifth working day of September; it is the starting
point for preparing for the end-of-year assessment in November. Since many senior managers and Congress request final
accomplishments immediately following the end of the year, CERCLIS accomplishment reports will be pulled on the
fifth and the tenth working days of October and reported in late October to  mid-November (see Manager's Schedule of
Significant Events at the beginning of this Manual for specific dates). This allows the Regions ample opportunity to
review cnd-of-year financial data, ensure that all accomplishments are accurately reflected in WasteLAN, and determine
which commitments were not met.

WasteLAN Reports for Accomplishment Reporting

     Exhibit II.7 presents the WasteLAN reports HQ uses to  evaluate Regional accomplishments. All are  used for
reporting and crediting accomplishments for targets and measures.  Following is a description of these reports:

•   The SCAP  Response  Financial Report (SCAP-04R), Federal Facility Financial Summary (SCAP-04F), and
    Enforcement Financial Summary (SCAP-04E) aggregate dollars by program area and provide both site-specific and
    non-site specific backup from WasteLAN. These reports should be used to compare the  funding requests contained
    in WasteLAN to the Regional budgets. Regions are prompted for "Primary" or "Alternate."

•   The Site Assessment Report (SCAP-13) is used by EPA for reporting estimates, plans, and accomplishments for
    SCAP measures.

•   The Superfund Accomplishments  Report (SCAP-14 and 14F) is used by EPA to track  targeting, planning, and
    accomplishment actions in support of the response and Federal facility programs.

•   The GPRA Report (SCAP-15) is used by EPA to track GPRA performance measures.

July 1,1998                                       II-14

-------
                                                                           OSWER Directive 9200.3-14-1E
    Settlements Master Report (ENFR-3) - This report lists all settlements to date.  Data are divided by settlement
    category and summarized by FY, Region, and remedy.

    Litigation Master Report (ENFR-6) - This report lists all litigation cases to date. Data are divided by litigation type
    and summarized by FY and Region.

    Administrative/Unilateral Orders Issued (ENFR-25) - This report lists AOs and UAOs that have been issued.

    Measures of Success Report (ENFR-62) - This report is intended to allow Regions to report progress on newly
    developed measures of success relating to enforcement fairness and trust fund stewardship.

    Environmental Indicators Report (ENVI-01) - This report provides EPA Regional management with a tool to easily
    monitor environmental indicators (El) data.

                                              EXHIBIT II.7
                            PROGRAM EVALUATION WASTELAN REPORTS
            SCAP-4E:
            SCAP-4F:
            SCAP-4R:
            SCAP-13
            SCAP-14/14F:
            SCAP-15:
            ENFR-3:
            ENFR-6:
            ENFR-25:
            ENFR-62:
            ENVI-01:
Enforcement Financial Summary
Federal Facility Financial Summary
SCAP Response Financial Report
Site Assessment Report
Superfund Accomplishments Report
GPR A Report
Settlements Master Report
Litigation Master Report
Administrative/Unilateral Orders Issued
Measures of Success
Environmental Indicators
 ILK  HQ EVALUATION OF REGIONAL PERFORMANCE

     Accomplishment data associated with targets/measures are pulled from WasteLAN at the close of business of the
 fifth working day of the quarter; therefore, it is necessary that the Regions update their accomplishments data as
 accomplishments occur, but in no case later than quarterly prior to the fifth working day pull date.  HQ
 management tracks and bases its evaluation of Regional program performance on these data. The data are pulled
• on a selected number of key indicators of progress in the Superfund program (e.g., construction starts and completions,
 early  action completions, site characterization starts, response settlements and referrals, RODs, and cost recovery
 activities). These numbers are the official numbers used in any reports of progress given to the Administrator, Deputy
 Administrator (DA), AAs, Congress, and the media. Detailed HQ management evaluation occurs at two points during
 the FY: after the second quarter (mid-year assessment) and after the fourth quarter (end-of-year assessment).  (See
 Exhibit II.8.) In addition, HQ will be conducting Regional reviews in FY 99and FY 00.

 Mid-Year Assessment

 The purpose of the mid-year assessment is to evaluate the utilization of Regional programmatic budgets.  Specifically,
 the mid-year assessment will be used to:

 •  Provide both HQ and the Regions with an opportunity to assess performance;

 •  Provide data to HQ and the Regions to make decisions on distribution of remaining budget;

 •  Consider the impact of Regional program performance on the Superfund pipeline;
                                                   11-15
                                                               July 1, 1998

-------
OSWER Directive 9200.3-14-IE
•   Work with Regions experiencing difficulty in meeting their targets; and

•   Identify trends in program performance and adjust program management strategies accordingly.

    On the fifth working day of April, second quarter SCAP data are pulled from WasteLAN. Following the mid-year
assessments, OERR, FFEO, FFRRO, OSRE, and OSPS Directors brief the AA SWER or AA OECA on the steps being
taken to ensure the accomplishment of annual targets.  To ensure that these actions are implemented, HQ will track
follow-up items and reallocate resources. The results of the mid-year assessment can result in increases or decreases to
third or fourth quarter AOAs based on Regional GPRA performance and obligation rates. The measure of a Region's
ability to meet their targets will be considered in August/September when final FY commitments and Regional budgets,
respectively, are established for the upcoming year.

End-of-Year Assessment

    Before the end of the fourth quarter, there is a preliminary pull for end-of-year accomplishments (the first week of
September).  This pull is used to project end-of-year accomplishments. It is important to stress that this is only a
projection and that the actual pulls, on the fifth and tenth working days of October, are likely to be somewhat different
than the projected numbers. Since many Superfund managers and Congress request final accomplishments immediately,
Regions should make every attempt to update WasteLAN at the earliest possible date and, in no event, any later than the
fifth working day after the end of the FY.

                                             EXHIBIT II.8
                              THE REGIONAL EVALUATION PROCESS










1st Quarter
* Pull WasteLAN
Reports on
GPRA/Program
Accomplishments


























2nd Quarter
Mid- Year Assessment
* Pull WasteLAN
Reports on
GPRA/Program
Accomplishments and
Internal Measures
* Perform Regional
Mid-Year Reviews

* Evaluate Program
Status

* Brief Senior
Management











3rd Quarter
* Pull WasteLAN
Reports on
GPRA/Program
Accomplishments
* Report on
Progress of
Regions Having
Difficulties
Meeting Targets














4th Quarter
End-of-Year
Assessment
* Pull WasteLAN
Reports on
GPRA/Program
Accomplishments
and Internal
Measures

* Develop Senior
Management
Reports Package

* Evaluate Program
Status
* Evaluate Annual
Performance and
Produce National
Progress Report
* Provide Input into
Next FY Work
Planning
* Brief Senior
Management Process




















July 1, 1998
II-16

-------
                                                                           :OSWER Directive 9200.3-14-IE

In November, HQ conducts the official end-of-year assessment. This assessment is an integrated analysis of program
performance activities for the year. The purpose of the end-of-year assessment is to emphasize pipeline issues (e.g.,
slipped targets and their impact on commitments for the next year). Missed targets may have resource implications for
the next FY, The end-of-year review also notes progress toward implementing strategies identified  in the mid-year
assessment, and identifies Regions that might require additional HQ assistance as the new FY begins.

    HQ considers the end-of-year assessment in developing the final GPRA targets/annual performance goals.  In this
way, the results of the end-of-year assessment have a double impact.

Regional Reviews

    Before the beginning of the FY, the program offices and Regions identify key program areas and issues in the
strategic plans or individual program management guidance. Those issues that HQ program managers believe to be
important to the general success of the program's mission are selected for discussion during the Regional reviews.

Management Reporting

        The following sections provide a brief description of the reports available to support Superfund program
management.

    Superfund Management Reports

    The implementation of an integrated WasteLAN data base, and the improvement of WasteLAN data quality led to
    the development of a series of senior management reports.  These management tools are designed to supplement
    conventional quarterly accomplishment reporting by providing a more comprehensive  examination of program
    activity. The format and content of the reports package has evolved over time to address a variety of project needs,
    providing EPA senior managers with summary graphic reports and backup site detail information.
    The FY 99 packages provide graphical representations of the status of targets and accomplishments, as well as
    analytic summaries of key aspects of the program including: status and duration of events; trend  analysis of PRP
    involvement; cost recovery  candidates; base closure  joint  indicators  of .progress;  and the current  status of
    negotiations, settlements, and litigation.

    The reports, produced semi-annually, illustrate the progress being made by the Agency  in both the movement of
    projects through the Superfund pipeline and in the trend toward increased involvement by PRPs. The semi-annual
    packages produced by OERR are. divided into three distinct sections:

        •   Report I: SCAP Estimates-and Accomplishments - This section graphically displays specific  program
            targets and accomplishments by Region, the percent of annual targets achieved in the major response and
            enforcement program areas, and annual target and accomplishment totals by activity for each Region.

        •   Report II: Trends Analysis - These graphs present the duration  analyses of pipeline events, including
            RI/FS, RD, and RA durations, durations from proposed to final listing, and proposed listing to first RI/FS
            start, first RD start, and first RA start, for both fund and enforcement.  Users can request that the duration
            reports be run for a  given FY or Region.

        •   Report III: Superfund Historical Performance - These reports provide graphical  presentations of progress
            made at NPL and non-NPL sites. Various information, including site, enforcement, budget, and project
            data, are used to present an overall picture of the Superfund program activities.
                                                  •H-17                                        July 1,1998

-------
 OSWER Directive 9200.3-14-IE

 Additional management reports produced by OSRE include:

         •    SOL Management Report (ENFR-17) - This report lists all planned and actual completion dates for
             removals, site assessments, and remedial activities by FY quarter. Planned and actual obligations for each
             activity are linked with cost recovery actions.

         •    Negotiation Master Report (ENFR-59) - This report lists all negotiations to-date.  Data are divided by
             negotiation category and summarized by FY, Region, milestones, completed negotiations, and ongoing
             negotiations.

 Additional management reports produced by FFRRO include:

         •    BRAC Pipeline Report (BRAC-OJ) - This report lists the pipeline actions within the current FY for any
             BRACsite.

         •    Environmental Baseline Study (EBS) Report (BRAC-02) - This report lists all BBS sites with starts or
             completions within the FY.

         •    Finding of Suitability of Transfer/Lease (BRAC-03) - This report lists all sites for which  a finding of
             suitability for transfer/lease is concurred within the current FY.

    Annual Reporting Requirements

    Commencing March 31, 2000, and each year thereafter, the Agency is required to submit to the President and
    Congress a GPRA program performance report that summarizes the program performance for the previous fiscal
    year. Specifically, each report will (a) review the success of achieving the program's objectives and subobjectives
    during the fiscal year, (b) evaluate the annual performance plan for the current fiscal year relative to the performance
    achieved toward the performance objectives and subobjectives in the fiscal year covered by the report, (c) explain
    and describe where a performance objective/subobjective has not been met, why it was not met, and those plans and
    schedules for achieving  it.

    In addition, the Chief Financial Officer's (CFO) Act of 1990 requires all agencies with a trust fund program to
    submit, in addition to an annual financial statement, a report on program performance measures.  Agencies have been
    directed to establish long-term goals and develop measures that are understandable to the general public. HQ relies
    heavily on accomplishment and reporting data in WasteLAN to develop and report on these measures. The  FY 99
    measures are presented in Exhibit II.9.
July 1, 1998                                        11-18

-------
                                                                           OSWER Directive 9200.3-14-1E
                                              EXHIBIT II.9
                                  CFO PERFORMANCE MEASURES
     Number of sites on the NPL where the first cleanup investigation has started compared to the total number of
     sites on the NPL                                  :
     Number of non-NPL sites with hazardous releases where EPA has begun a cleanup action
     Number of sites on the NPL where a decision has been made about how to proceed with the cleanup of at
     least a significant portion of the site compared to the total number of sites on the NPL
     Number of sites on the NPL where remedial action has been completed for at least a significant portion of the
     site compared to the total number of sites on the NPL  ,                                           ...
     Number of sites on the NPL where cleanup construction is completed compared to the total number of sites
     on the NPL                          •               '
     Number of enforcement actions  taken at NPL sites to have potentially responsible parties (PRPs) conduct or
     participate in response activities compared to the total number of sites on the NPL, and the percentage and
     estimated value of PRP commitments  for response activities at non-Federal facilities sites on the NPL
     The total value of cost recovery settlements and judicial actions achieved and past costs considered
     recoverable                                                 .
     The amount of money EPA has collected from PRPs compared to the total amount achieved in cost recovery
     settlements and judicial actions
     The estimated amount of money PRPs have committed legally to site cleanup compared to the total amount
     of funds obligated by the Superfund enforcement program
     The number of de minimis settlements, potential value of these settlements, and the estimated number of
     settlors                                             ,
NOTE: It is anticipated that separate reporting of CFO Performance Measures will occur in FY 98, but will probably
be merged with GPRA in FY 99.


ILL TARGET AND DEFINITION CHANGE REQUESTS

    After targets have been finalized and funding levels developed, the SCAP process provides the flexibility to modify
plans during the year. Modifications to planned GPRA targets/annual performance goals are termed change requests.
Regional requests for changes to targets  established in the annual plan must be forwarded in writing from the
Regional Division Director to HQ OERR, OECA, FFRRO, or OSPS, Office Directors, as applicable, when the Region
is unable to make a site substitution for a target,

    Any exceptions to the accomplishment definitions contained in the Appendices to this Manual are considered target
definition changes.   Regions also should note that changes made in WasteLAN to site schedules and other planning data
will not automatically result in changes to targets.

    Target changes that modify the Region's AOA require a financial change request. In these situations, the financial
change request becomes the target change request. Chapter III outlines the change request procedures.

    Although Regions have the flexibility to alter plans, they are still accountable for meeting the targets established at
the beginning of the FY. Changes  to commitments should not be made simply because targets will not be met.  Regions
should discuss  with HQ during the mid-year reviews any issues that may affect the meeting of negotiated annual targets.

    In some cases, however, changes to targets may be necessary and may be revised under the following conditions:

•   Major, unforeseen contingencies arise that alter established priorities (i.e., Congressional action, natural disasters);

•   Major contingencies arise to alter established Regional commitments (i.e., State legislative action);
                                                  11-19.                                       July 1, 1998

-------
 OSWER Directive 9200.3-14-IE

 •    Measure or definition in system is creating an unanticipated negative impact;

 •    Major shifts in project approach ; or

 •    Need to address newly identified site which represents a significant human health or ecological risk.

     OERR, OECA, FFRRO, and OSPS require that all target and definition changes be submitted to HQ no later than
 July, prior to the distribution of the fourth quarter AOA.  Optimally, such requests should be submitted during discussions
 with HQ during mid-year reviews..

     Regions should not initiate any obligations against change requests until the HQ Office of the Comptroller (OC) and
 the Director of the appropriate office approve the revised AOA in IFMS.  The site back-up in WasteLAN should be
 revised by the Region if the change is approved.

 Maintaining the Planning Estimates/Targets

     Regions are responsible for initiating the work planning process and for entering the preliminary and final  targets
 into WasteLAN. Prior to workload planning sessions with HQ, Regions can use the Regional Planning screen to identify
 which sites meet the planning logic as potential accomplishments for the upcoming FY. From this universe of sites
 (shown in red as Planning Data on the Regional Planning screen), Regions can identify primary candidate site— those
 that sites that are most likely to be accomplished. After identifying primary candidates (shown in blue on the Regional
 Planning screen), the Regions can then use the target lockout feature found on the Regional Planning screen to copy the
 primary candidate number to the Planning Estimates/Targets  screen.  This number is used as a  starting point in
 identifying the Region's planning estimates/targets during workload planning sessions. After workload planning sessions
 are completed, Regions use the Planning EstimatesATargets screen to make any necessary changes. Once changes have
 been made and final targets/planning estimates are reviewed by HQ, the Regions will be "locked out" from making any
 changes to these numbers. This final number is shown in red on the Accomplishments Tracking screen as the Planning
 Estimates/Target number. During the FY if changes have been made to the number of target commitments  approved,
 HQ will "unlock" the target numbers allowing the Region to make the approved change(s),  and then "relock" the screens.

     In general, HQ does not require site-specific targeting. The two exceptions are Cost Recovery actions at sites with
 upcoming Statute of Limitations (SOLs) so that they will be addressed prior to the expiration of the SOL, and de minimis
 settlements. Changes to sites identified as targets for these measures require HQ approval.


UM SPECIAL REPORTING TOPICS

 Brownfields

     The Brownfields Pilot Program is funded using Superfund money under EPA's CERCLA investigatory and removal
 authorities. These properties are generally not traditional Superfund sites as they are not highly contaminated and present
 lesser health risks.  The Brownfields Pilot Program is intended to provide EPA, States, local governments, and Federally
 recognized Indian Tribes with useful information and new strategies for promoting a unified approach to environmental
 assessment, cleanup, and  redevelopment. As such, this program leads to the cleanup of hazardous waste sites, but not
 in the traditional context. Therefore, a traditional approach such as the current SCAP process cannot capture the true
benefits of  the program. To do  this, EPA has signed a cooperative agreement with the Institute for Responsible
Management (IRM) to work with the pilots and track their progress. This progress tracking of the Brownfields program
 will not be done  via the WasteLAN database as all  other Superfund progress is reported.   IRM will have the
responsibility for reviewing  the goals and objectives, measures  of success, and progress of each pilot, and develop a
pilot-specific matrix that will track the progress at each pilot. Through this effort, EPA is capturing the progress at the
Brownfields pilots and  fulfilling the spirit of GPRA.
July I, 1998                                        11-20

-------
                                                                            OSWER Directive 9200.3-14-1E

Reinventing Site Assessment

    As the nature of site assessments change, new reporting and accountability challenges to accurately portray the extent
of State, Federal, and local government site assessment activities need to be addressed. Traditional  CERCLA reported
site assessments, including integrated assessments, should continue to have accomplishments entered into WasteLAN
when they occur. . As Regions provide States flexibility in Cooperative Agreement applications and work plans by
expanding the definition of types of assessment activities to be performed, the States also need to provide accountability
for the activities performed through quarterly or annual reporting of the number of sites assessed, types or nature of
assessments performed, and assessment results. Management systems at the State and probably Federal level will be
needed to provide the accountability necessary and, also, to identify program accomplishments.

Base Closure

EPA is providing resources to support the President's Fast Track Cleanup program. To facilitate EPA's justification
of these resources, Regions are required to support several data points for closing bases. WasteLAN has been modified
to include these items.


II.N GENERAL WORK PLANNING AND REPORTING REQUIREMENTS

    The following section discusses some of general work planning and reporting requirements of the various Superfund
offices.

Data Lockout on Historical Accomplishments

    WasteLAN  has a historical accomplishment lockout feature that logs and controls changes to Superfund data
sensitive to Congressional inquiry. This feature uses Change Log Smart Screens and reports that list all changes that have
been made to historical accomplishments  data.  A Regional Manager for Superfund shall approve either in writing, or
using the management review function in WasteLAN, each data change made by a Region to locked historical data. Only
Regional IMCs,  or individuals designated by the IMC, shall have access/authority to change/add/delete their own
Region's data via a WasteLAN Smart Screen once written approval has been received. All other regional personnel will
be denied access to the change system. Written approval documents or records of approval via WasteLAN management
review must be maintained by the IMC for the duration of the life cycle of the data changed (up to seven years).

    Each  Region will establish  a policy or procedure to ensure that the appropriate people have knowledge of and
approve of the change. All approval documents must bear a System Generated Reference Number or Document Number.

Data Validation and Verification

    GPRA requires that an agency address its verification and validation procedures for performance data in the annual
performance plan.  WasteLAN data verification and validation procedures were incorporated as part of Superfund
programs' submission to the EPA's annual performance plan.

    A key component of WasteLAN verification/validation procedures in the Regional CERCLIS Data Entry Internal
Control Plan.  The internal controls for WasteLAN data were previously cited as a weakness by the Office of  the
Inspector General.  In response  to this weakness, the Regions developed and submitted control plans in 1994. The
control plans include: (1) regional policies and procedures for entering data into WasteLAN; (2) a review process to
ensure that all  Superfund accomplishments are supported  by  source documentation; (3) delegation of authorities  for
approval  of data input  into WasteLAN; and (4)  procedures to  ensure that reported  accomplishments meet
accomplishment definitions. Also, Regions should document in their control plans the roles and responsibilities of key
regional  employees responsible for WasteLAN data (e.g., regional project  manager, information management
coordinator, supervisor, etc.), and the processes to assure that WasteLAN data is current, complete, consistent, and
accurate.
                                                  II-21                                        July 1, 1998

-------
OSWER Directive 9200.3-14-IE

    With the implementation of the new WasteLAN and the increased emphasis on verifiable and validated data by
GPRA, the program offices are requesting that the Regions review their current CERCLIS Data Entry Internal Control
Plans and update their control plans according to the requirements listed above.

    In addition, Regions are required to submit to their Regional Superfund Records Center the document that constitutes
or justifies an accomplishment date (actual start  or actual complete)  recorded  in WasteLAN.  (Documentation
requirements for these dates can be found in the Appendices to this Manual in the "Definition of Accomplishment"
section of the applicable target or measure.) When submitting the documentation to its record center, the Region should
provide the  target/measure category and the WasteLAN Operable Unit (OU)/action name/sequence number.  The
Regional Records Center is to include this SCAP data with the document index data, and provide the document index
number from its tracking system for  entry into  the WasteLAN  comments field associated with the applicable
accomplishment date.

Action Lead Codes

    Action lead codes identify the entity performing the work at the site.  Exhibit 11-12 shows the valid project/action
lead codes in CERCLIS/WasteLAN.

    A lead code must be placed in WasteLAN for all Actions. Only the leads that are valid for the chosen Action can be
entered . Leads are not required for SubActions.  Regions have the ability to code the lead for project support activities
(i.e., community relations, support agency assistance, etc.) based on Regional preference. All enforcement actions (i.e.,
orders, decrees, PRP searches, etc.) performed by EPA should have a lead of "FE"  (Federal Enforcement).  All
enforcement actions conducted by the State should have a lead of "SE" (State Enforcement). CERCLIS/WasteLAN
should not contain planned obligations for projects with "SR" or "SN" leads.  No funds will be provided for activities
with these leads.

    The Agency acknowledges that States can and have assumed the lead role in reaching an agreement with the PRPs
for response activities at NPL sites without negotiating a cooperative agreement or other formal agreement with EPA
(SR-lead). However, the NCP has determined that in the absence of a formal agreement the State will not be officially
recognized as the "lead agency" for the project and EPA will not concur on the remedy selected.
July 1, 1998                                       11-22

-------
                                                                        OSWER Directive 9200.3-14-1E
                                           EXHIBIT 11.10
                                 ACTION LEAD CODES IN WASTELAN
Lead        Definition
F            Fund-financed response actions performed by EPA (applies to response actions)

RP          PRP- financed response actions performed by the PRP under a Federal order/ CD (applies to
             response actions)

S            Fund-financed response actions performed by a State. Money provided through a Cooperative
             Agreement (CA) (applies to response actions)

PS          PRP-financed response actions performed by PRP under a State order/ CD with PRP oversight paid
             for or conducted by EPA through an EPA CA with the State, or, if oversight is not funded by EPA,
             a State Memorandum of Agreement (SMOA) or other formal document between EPA and the State
             exists which allows EPA review of PRP deliverables (applies to response actions)

SN          State-financed (no Fund dollars) response actions performed by the State (applies to response
             actions)

SR          PRP response under a State order/ CD and no EPA oversight support or money provided through a
             CA and no other formal agreement exists  between EPA and the State (applies to response actions)

CG          Work performed by the Coast Guard - Limited to  removals (applies to response actions)

MR          Work performed by PRP under a Federal  CD with an agreement that the Fund will provide some
             reimbursement to the PRP preauthorization mixed work, (applies to response actions)

SE          Enforcement actions performed by a State. Money provided through a CA or, if not funded by
             EPA, a comparable enforcement document exists  (applies to RODs and enforcement actions)

FE    '      Enforcement actions performed by EPA or work done by enforcement program at private or
             Federal Facilities sites (applies to RODs and enforcement actions). Historically (Pre-FY 89)
             applied to RI/FS and RD response actions.

EP          Response actions performed by EPA using in-house resources

FF          Response actions performed by the Federal Facility with oversight provided by EPA and/or the
             State at sites designated as Federal Facilities on the NPL (also applies to RODs at Federal
             Facilities)

TR          Indian Tribal Governments

CO          Community Organization (Only valid for Community Involvement Activities)

OH          Other

SD          State Deferral is a PRP- or State-financed response action at an NPL caliber or proposed NPL site
             overseen or conducted by the State pursuant to a deferral agreement with the Region.
                                                II-23                                      July 1,1998

-------
OSWER Directive 9200.3-14-1E

Lead Changes

    A takeover or lead change occurs when the entity performing a response action changes after the action has started
and credit has been given.  Typically, this occurs when a settlement with the PRP had been reached after the action
started.  It may also occur when the Fund assumes an RP-lead project because of non-compliance with an Administrative
Order (AO) or Consent Decree (CD).

    In order to avoid delays resulting from PRPs assuming the lead during a discrete phase of the project (a takeover),
a policy has been established that limits lead changes from EPA to PRPs in the middle of a phase of the Superfund
process, except in situations where the change will not cause undue delays (OSWER Directive 9800.1-01, Limiting Lead
Transfers to Private Parties During Discrete Phases of the Remedial Process, November 14, 1991). The policy applies
to lead changes from EPA to PRPs only, not EPA takeovers of PRP work or lead changes involving States.

    It is expected that much of the early site assessment activities will be Fund-lead. However, response lead changes
(i.e., changeovers) can occur at any of the following points in the process:  .

•   Prior to development of an EE/CA for a NTC removal action;

•   Prior to the ESI/RI or RI/FS;

•   Prior to the FS if the RI and FS are being done separately;

•   After the ROD is signed and prior to beginning the RD or RA or early action (remedial authority); and

•   Prior to RA contract solicitation, when funding the RA would have significant implications for the Fund and when
    no significant delays will occur.

    When circumstances warrant passing the lead to PRPs during a phase of cleanup, steps should be taken to minimize
potential causes of delay. For example, if PRPs assume the lead during the RI/FS, they should be given a limit of 60 days
to enter into an Administrative Order on Consent (AOC) for performing the work.

    If a PRP is allowed to take over a response action after dollars have been obligated,  the Region should retain the
funds needed for oversight of the entire PRP action and deobligate the rest. Funds that are deobligated may  be replaced
in the Region's AOA and used in accordance with the flexible funding priorities outlined in Chapter III. Deobligated
RA or early action under remedial authority funds must be returned to HQ for funding of other priority RA or early
actions  (remedial authority) projects.

    When dollars were originally obligated for Fund-financed actions  and a takeover occurs, Regions will have to
request a change  in the account number through their Regional Financial Management Office (FMO). The Action code
within the account number changes if the Agency is acting in an oversight role as opposed to performing the response
action.

    RP-lead projects that are deficient or where the PRPs are recalcitrant may be addressed by the response program.
If the project requires substantial Fund involvement to correct, it should be coded as a takeover  in CERCLISAVasteLAN.
If a takeover of an Action does occur, a new Action must be created in WasteLAN.  A takeover does not create a new
OU.  The completion date of the original  Action must be the same as the start date of the new Action. Takeover/Phased
Indicators must be entered with both Actions. The "Original Action Takeover (TO)" indicator is used to flag the original
Action which has the change in lead, whereas a "New Action resulting from Takeover (TN)" indicator is used to flag
the new Action.  Exhibit II-13 provides an example of the coding takeovers.
July 1,1998                                        11-24

-------
                                                                            OSWER Directive 9200.3-14-1E
                                              EXHIBIT IL11
                                       CODING OF TAKEOVERS
Event Takeover
OU


01


01

Action Seq.
Name

Combined 1
RI/FS

PRP RI/FS 1

Lead Actual Actual Takeover/
Start Comp. Phased
Indicator
F 8/1/97 9/1/97 TO


RP 9/1/97 TN

Comments


Fund-financed
Action being taken
over by PRPs
PRP Action
initiated
Action Qualifiers for Site Screening and Assessment Actions

    Site screening and assessment decisions are made upon completion of each site assessment action.' These decisions
identify how the Region will proceed with site response and are recorded in WasteLAN as action qualifiers (Qualifiers).
These decisions include:

•   No Further Remedial Action Planned (NFRAP)

    No further Superfund remedial assessment work will be taken at a site with a NFRAP determination [Qualifier =
    (N) No Further Remedial Action Planned] unless new information warranting such action is presented to EPA.

    NFRAP decisions should not be confused with WasteLAN archiving. NFRAP decisions are made from a site
    assessment perspective only; they simply denote that further Superfund assessment work is not required based on
    currently available information. In contrast, the archival of WasteLAN sites is made only when no further Superfund
    interest exists at a site.  This means that sites are not archived  if there are planned or  ongoing removal or
    enforcement activities, or if other Superfund interest still exists, even if a NFRAP decision was made at them during
    site assessment activities.

•   Further Evaluation

    Upon completion of each site assessment action, the Region may determine that additional, more complex evaluation
    activities are required to determine whether or not the site should be pursued for placement on the NPL. A decision
    to conduct further evaluations at a site is recorded differently in WasteLAN depending on what site assessment
    activity is being performed.

    For PAs, Sis, and SIPs, further evaluation is denoted by either making a decision of higher priority [Qualifier = (H)
    High], or lower priority [Qualifier = (L) Low] for further evaluation.

    For ESIs and  ESI/RIs, further evaluation is denoted by the decision of lower priority for further evaluation or to
    recommend the site for HRS scoring [Qualifier = (G) Recommended for HRS  Scoring].

    Further evaluation activities  upon completion of an HRS Package consist of HQ quality assurance and ultimately
    a decision on  whether to propose the site to the NPL [Qualifier = (0) Site is being considered for proposal to the
    NPL].
                                                  11-25
                                                                                              July 1, 1998

-------
OSWER Directive 9200.3-14-1E

•   Perform an Early Action

    Upon completion of PAs, Sis, SIPs, ESIs or ESI/RIs, the Region may determine that a time-critical or non-time
    critical (NTC) removal is necessary. The decision recorded for these actions are "Referred to Removal, Needs
    Further Remedial (Qualifier = F)" or "Referred to Removal, No Further Remedial (Qualifier = W)."

•   Aggregate the Site into Another "Parent"NPL Site

    Upon completion of PAs, Sis, SIPs, ESIs, or ESI/RIs, the Region may decide to collapse or combine a site into an
    existing "parent" NPL site.  This would be done when contamination at a non-NPL site is being addressed by
    cleanup actions at an existing NPL site. This most frequently occurs at Federal facilities and sites with an area-wide
    groundwater contamination problem resulting from multiple sources. The decision to aggregate a site into an
    existing NPL site requires the following information in CERCLIS/WasteLAN:

        Upon completion of the site assessment activity that led to the decision to aggregate the site, the Region should
        enter a qualifier of Site Being Addressed as Part of an NPL Site ( A);

        The EPA ID number of the parent site must be entered into the Parent Site ID field (Site Parent ID) for the site
        which has been aggregated; and
        The NPL Status for the site being aggregated must be changed to 'Site is part of NPL Site'.

    After a site is aggregated into the parent site, no further work should be recorded at the aggregate site. Instead, any
    further response work performed at the aggregated site should be recorded under the existing parent NPL site,
    possibly as a separate operable unit.

-   Defer the Site to RCRA (Subtitle C) or the NRC

    Upon completion of PAs, Sis, ESIs, or SIPs at non-Federal facilities, the Region may determine that the site is
    excluded from Superfund consideration under policy, regulatory, or legislative restrictions and defer it to either the
    RCRA program or to the NRC. [Qualifier = (D) Deferred to RCRA (Subtitle C) or NRC].

•   Site is being Remediated via a State or Tribal Program

    After completion of the SI, SIP, ESI or preparation of an HRS package, the Region may find that the site is being
    addressed by a State or Tribal government and requires no further Federal Superfund involvement.

Record of Decision (ROD)

    A ROD is prepared after completion of public comment period on the FS and proposed plan for an early action
(remedial authority) or long-term  action.. The ROD identifies the Agency's selected remedy.

    ROD Changes
    After a ROD is signed, new information may be generated that could affect the remedy selected.  Three types of
    changes can occur:

        •   Non-Significant Changes - Non-significant changes fall within the normal scope of changes occurring
            during the Remedial  Design (RD)/ RA or early action (remedial authority). These changes typically result
            from value engineering. This may cause minor changes in the  type/cost of materials, equipment facilities,
            services, and supplies. When such changes do not significantly affect the scope, performance, or cost of
            the remedy, they are considered minor or non-significant.

            Minor changes should be documented in the post-ROD files.  The documentation should  not be a part of
            the Administrative Record (AR) for the ROD.
July 1, 1998                                       11-26

-------
                                                                      OSWER Directive 9200.3-14-1E

    •   Significant Changes to a Component of a Remedy - Significant changes to a component of a remedy
        generally are incremental  changes to the hazardous waste approach selected for the site (i.e., a change in
        timing, cost and implementation). These changes do not fundamentally alter the overall approach intended
        by a remedy.  When significant changes are made to a  component of a remedy, an Explanation of
        Significant Differences (ESD) should be prepared.

        The ESD is made available to the public and placed in the AR.  A formal public comment period, public
        meeting, and responsiveness summary are not required.  While the ESD is being prepared and made
        available to the public, response activities should continue.  An ESD is not a new ROD and should not be
        coded as such in WasteLAN. It should be entered as a SubAction to the ROD (Action Name = Record of
        Decision and SubAction Name = Explanation of Significant Dif). ESDs are being tracked as an internal
        reporting measure.

    •   Fundamental Changes to the ROD - When the hazardous waste management approach selected in the
        ROD is reconsidered, it  is  a fundamental change.  For example, the innovative technology originally
        selected in the .ROD did not perform satisfactorily during the pilot scale testing, and a decision is made to
        switch to another remedy. This would represent a fundamental change. If, as a result of PRP negotiations,
        the remedy in the ROD is  changed from incineration to bioremediation, this also represents a fundamental
        change.  When such fundamental changes or amendments are made to a remedy, the ROD process (revised
        proposed plan, public comment period, public meeting, responsiveness summary, and amended ROD)
        should be repeated. The  amended ROD must be placed in the AR.  A fundamental change to the ROD
        should be recorded as a ROD amendment SubAction in WasteLAN (Action Name = Record of Decision
        and SubAction Name = ROD Amendment). Regions must enter the  actual completion date of the ROD
        Amendment along with the Alternative Name, Media Name, Media Type and Selected Response Actions.
        ROD Amendments are being tracked as an internal reporting measure.

RODs Requiring No Physical Construction

At some NPL sites, EPA may determine, through the Remedial Investigation/Feasibility Study (RI/FS) (or other
means), that no physical construction is necessary to protect human health  and the environment. Such determination
may be documented in no action/no further action RODs including RODs  that only require monitoring, and Limited
Action RODs requiring monitored natural attenuation or institutional controls, only.

These ROD events should be coded into CERCLIS/WasteLAN as follows:

    •   Action Name = Record of Decision;

    •   Alternative Name

    •   Media Name

    •   Media Type (Air, Groundwater, Leachate, Liquid Waste, Other,  Residuals, Sediment, Sludge, Soil, Solid
        Waste, Surface Waste); and

    •   Selected Response Actions

            No Action RODs:
            •   No Action
            •   No Further Action
            •   Monitoring

            Limited Action RODs:
            •   Natural Attenuation
            •   Institutional Controls  (Access  Restriction, Access Restriction-Guards, Access Restriction-

                                             11-27          '                            July  1, 1998

-------
 OSWER Directive 9200.3-14-1E

                     Fencing, Deed Restriction, Drilling Restriction, Fishing Restriction, Institutional Controls Not
                     Otherwise Specified (N.O.S.), Land Use Restriction, Monitoring; Recreational  Restriction,
                     Revegetation, Swimming Restriction, and Water Supply Use Restriction)

 Anomalies and Phased Projects

     Anomalies are those projects that do not fit the normal definitions of pipeline actions. Anomalies can be those
 projects that 1) do not receive SCAP credit, but still need to be tracked, or 2) occur out of the ordinary pipeline
 progression.

   .  An example of a SCAP anomaly occurs when different entities conduct FS work simultaneously that lead to a single
 ROD. Since it is inconsistent to give credit for more FS starts than completions (the Agency would have to explain why
 FS work is not leading to a ROD), only one FS can receive credit for a start and completion. These projects are coded
 under the same OU with multiple sequence numbers and those  FSs that will  not receive  credit are given a
 Takeover/Phased Indicator of "Other Start and Completion Anomaly (OA)."

     At the RD and RA stages, a project may be phased or time-sequenced to accelerate the cleanup effort. Phasing is
 complementary to OUs. Whereas OUs break large, complex projects into smaller, more manageable work elements,
 phasing is a method to accelerate the implementation of the OUs.  Phasing manipulates the internal steps required to
 complete each OU, thereby optimizing the overall schedule; for example, a RA that requires site clearing prior to
 constructing an incinerator. The clearing would be one phase of the RA, while the construction of the incinerator would
 be a second phase.

     Regions enter a separate RA for each phase. Phases of each response action are shown in CERCLIS/WasteLAN
 by the use of the Takeover/Phased Indicators of  Phased Start (PS) and Phased Complete (PC) or Phased  Start  and
 Completion (PB) (See Exhibit 11-14).  Funding required for each of the phases is tracked against the phase. However,
 the duration of the project is calculated from the date the first phase started to the date the last phase is completed.
July 1, 1998                                       11-28

-------
                                             OSWER Directive 9200.3-14-IE
                    EXHIBIT 11.12
REMEDIAL EVENTS, ANOMALIES, AND PROJECT PHASING
ou
01
01
01
01

01
01
01
01
Action Seq.
Name
PRP 1
RI/FS
PRP 1
FS
PRP 2
FS
R01 1
AN01
RD1
RD2
RA1
RA2
Lead
RP
RP
RP
FE

RP
RP
RP
RP
Plan
Start
96/2
97/3
97/3


99/1
99/2
QO/3
00/3
Plan
Comp
98/3
98/3
98/3
98/3

00/2
00/3
01/1
04/1
Takeover/
Phased
Indicator

OA
OA


PC
PS
PC
PS
Comment

No Credit for
Start or
Completion
No Credit for
Start or
Completion


PHASE I
PHASE II
PHASE I
PHASE II
                        11-29
July 1, 1998

-------
OSWER Directive 9200.3-14-IE
                                       This Page Intentionally
                                             Left Blank
July 1,1998                                     11-30

-------
                                         QSWER Directive 9200.3-14-1E
       Superfund/Oil Program Implementation Manual FY 99/00

           Chapter III: Superfuhd Financial Management
   THIS CHAPTER IS BEING REVISED BY HQ
AND WILL BE DISTRIBUTED AT A LATER DATE
                                                  July 1, 1998

-------
OSWER Directive 9200.3-14-IE
                                       This Page Intentionally
                                             Left Blank
My 1, 1998

-------
                                   OSWER Directive 9200.3-14-1E
Program Implementation Procedures
                                                July 1, 1998

-------
OSWER Directive 9200.3-14-lE
                                        This Page Intentionally
                                             Left Blank
July 1, 1998

-------
                                          OSWER Directive 9200.3-14-1E
Superfund/Oil Program Implementation Manual FY 99/00




         FY 99 Response Performance Measures

-------
OSWER Directive 9200.3-14-lE
                                        This Page Intentionally
                                              Left Blank

-------
                                                                         OSWER Directive 9200.3-14-1E
                                 FY 99 RESPONSE PERFORMANCE MEASURES

The following table represents the FY 99 Response Performance Measures. This table is only relevant for Appendix A: Site
Assessment and Appendix B: Response Actions.
REPORTS
PERFORMANCE
MEASURES
Sites Archived
Pre-CERCLIS Screening
Assessments
Site Discovery
Brownfields Assessment
Preliminary Assessments
(PA) at Non-Federal
Facility Sites
Federal Facility
Preliminary Assessments
Review
Site Inspections (SI)
Site Inspection
Prioritizations (SIPs)
Expanded Site Inspections
(ESI)
Integrated Expanded Site
Inspection/ Remedial
Investigation (ESI/RI)
Hazard Ranking System
Package (HRS)
Integrated
Removal/Remedial
Evaluation
Regional Decisions
Engineering
Evaluation/Cost Analysis
(EE/CA)
GPRA TARGET/
ANNUAL "
PERFORMNACE
GOAL - '
IG
IG
IG
IP
G
IP
IG
G
G
G
G
G
IP
IP
OFFICE OF
: THE CHIEF
FINANCIAL
OFFICER














EPA
SENIOR
MANAGER
•

•







•

•

CONGRESSIONAL
INQUIRIES
GAO/IG
OMB














RESOURCES
WORKPLANNING
•
•
•



•
•
•

•



  G
  IP
  IG
GPRA Target/Annual Performance Goal
Internal Program Measure
Internal GPRA Measure
                                 1
                                                                                         July 1, 1998

-------
   OSWER Directive 9200.3-14-1E
                                 FY 99 RESPONSE PERFORMANCE MEASURES

The following table represents the FY 99 Response Performance Measures. This table is only relevant for Appendix A: Site
Assessment and Appendix B: Response Actions.
REPORTS
PERFORMANCE
MEASURES
Support Agency
Assistance
Technical Assistance
Remedial Investigation
(RI) Starts
Feasibility Studies (FS)
Starts
Combined RI/FS Start
Start of Public Comment
Period (Proposed Plan to
Public)
RI/FS Duration
Decision Document Signed
ROD Amendments and
Explanation of Significant
Differences (ESDs)
Treatability Studies
Pre-Design Assistance
Remedial Design (RD)
Start
RD Completion
Remedial Action (RA)
Start
RA Contract Award
Start of Response Actions
GPRA TARGET/
ANNUAL , .
PERFORMNACE
GOAL
IP
IP
IP
IP
IP
IP
IG
IP
IP
IP
IP
IP
IP
G
IP
G
•
OFFICE OF
THE CHIEF
FINANCIAL
OFFICER


•




•








"' ;EPA, -••'
SENIOR
MANAGER


•

•

•
•
•


•
•
•
•
•
CONGRESSIONAL
1 INQUIRIES
GAO/IG
OMB






•
•



•
•
•
•

RESOURCES
WORKPLANISING
•
•
•
•
•


•
•


•
•
•
•
•
   G
   IP
   IG

   July 1, 1998
GPRA Target/Annual Performance Goal
Internal Program Measure
Internal GPRA Measure

-------
                                                                         OSWER Directive 9200.3-14-1E
                                 FY 99 RESPONSE PERFORMANCE MEASURES

The following table represents the FY 99 Response Performance Measures. This table is only relevant for Appendix A: Site
Assessment and Appendix B: Response Actions.
REPORTS
PERFORMANCE
MEASURES
Completion of a Response
Action/Activity
NPL Site Construction
Completions Through
Early Actions, Long-Term
Actions, or RODs
Operational and Functional
(O&F)
Long Term Response
Action (LTRA)
NPL Site Completions
Operation and
Maintenance (O&M)
Five- Year Reviews
Partial NPL Deletion
Non-NPL Site Completion
El 1A Populations
Protected
El IB Progress Through
Environmental Indicators
(Achieving Permanent
Cleanup Goals)
El 1C Technologies Used
and Volumes Handled at
NPL and Non-NPL Sites
Community Involvement
Plan
Information Repository
Public Meeting
GPRA TARGET/
ANNUAL
PERFORMNACE
GOAL
IG
G
IP
IP
G
IP
IP
IP
IG
IG
IG
IG
IP
IG
IP
OFFICE OF
THE CHIEF ,
FINANCIAL
OFFICER
•
•


•










,EPA
SENIOR
MANAGER
•
•

•
•
V
•


•
•
•



CONGRESSIONAL
INQUIRIES *
„ GAO/IG
OMB
•


-..
•

•


•
•
•



RESOURCES
WORKPLANNING
•
•



•
•








  G
  IP
  IG
GPRA Target/Annual Performance Goal
Internal Program Measure
Internal GPRA Measure
                                 3
                                                                                          July 1,1998

-------
   OSWER Directive 9200.3-14-1E
                                 FY 99 RESPONSE PERFORMANCE MEASURES

The following table represents the FY 99 Response Performance Measures.  This table is only relevant for Appendix A: Site
Assessment and Appendix B: Response Actions.
REPORTS
PERFORMANCE
MEASURES
Community Advisory
Groups
Technical Assistance
Grants (TAGs)
Technical Outreach
Services for Communities
(TOSC)
The number of Fund-lead
remedies selected by states
or tribes per year
The number of NPL sites
at which the states or tribes
are the lead for an operable
unit per year
The number of agreements
negotiated with states and
tribes (Superfund
Partnership Agreements,
Superfund included in a
(cross program)
Performance Partnership
Agreements, Voluntary
Cleanup Agreements)
Dollars provided to States
and Tribes through
cooperative agreements
(cumulative and per year
Duration from discovery to
removal start
GPRA TARGET/
ANNUAL
PERFORMNACE
GOAL
IG
IG
IP
IG
IG
IG
IG
IG
OFFICE OF
THE CHIEF
FINANCIAL
OFFICER ,








EPA ,
SENIOR
MANAGER








CONGRESSIONAL
INQUIRIES
GAO/IG .
OMB -








RESOURCES
WORKPLANNING

•






   G
   IP
   IG
GPRA Target/Annual Performance Goal
Internal Program Measure
Internal GPRA Measure
   July 1, 1998

-------
                                                                         OSWER Directive 9200.3-14-1E
                                 FY 99 RESPONSE PERFORMANCE MEASURES

The following table represents the FY 99 Response Performance Measures. This table is only relevant for Appendix A: Site
Assessment and Appendix B: Response Actions.
.REPORTS
PERFORMANCE
MEASURES'
Duration of completed
NPL and non-NPL
removal actions for Fund-
lead sites
Duration from NPL listing
ot first Record of Decision
(ROD)
Duration of completed
Fund-lead remedial actions
Duration from NPL final
list to RI/FS start at federal
facility sites
Duration from ROD to RA
start at federal facility sites
Duration from ROD to
Interagency Agreement
execution at federal facility
sites
Duration of ROD to RD
start for Fund
Cost of completed NPL
and non-NPL removal
actions for Fund-lead sites
Cost of completed Fund-
lead remedial actions
GPRA TARGET/
ANNUAL
PERFORMNACE
. GOAL '
IG
IG
IG
IG
IG
IG
IG
IG
IG
OFFICE OF
THE CHIEF
FINANCIAL
OFFICER" -









, -EPA .
SENIOR
MANAGER \









CONGRESSIONAL
INQUIRIES
, GAO/IG
OMB









RESOURCES
WORKPLANNING









   G
   IP
   IG
GPRA Target/Annual Performance Goal
Internal Program Measure
Internal GPRA Measure
                                                                                          July 1, 1998

-------
OSWER Directive 9200.3-14-lE
                                       This Page Intentionally
                                             Left Blank

-------
                                              OSWER Directive 9200.3-I4-1E
   Superfund/oil Program Implementation Manual FY 99/00




Appendix A: Site Screening and Assessment/Regional Decisions
                                                          July 1, 1998

-------
OSWER Directive 9200.3-14-lE
                                        This Page Intentionally
                                              Left Blank
July 1, 1998

-------
                                                                                OSWER Directive 9200.3-14-1E

                                                    Appendix A
                               Site Screening and Assessment/Regional Decision
                                              Targets and Measures

                                                Table of Contents

        Site Screening and Assessment/Regional Decision FY 99/00 Targets And Measures	 A-1
            Reinventing Site Assessment	,	 A-1
            Site Assessment Backlogs	 A-1
            Overview of FY 99/00 Site Screening and Assessment/Regional
               Decision Targets and Measures	 A-2
            GPRA and Site Assessment	•	 A-2
            Superfund Durations	 A-3
            Site Screening and Assessment/Regional Decision Definitions
               Brownfields Assessment 	 A-6
            Pre-CERCLIS Screening Assessments 	 A-6
            Site Discovery	 A-7
-    ,       SSA-3 • Sites Archived	 A-8
            Preliminary Assessments (PA) at Non-Federal Facility Sites	 A-9
            Federal Facility Preliminary Assessment Reviews 	;	 A-10
            Site Inspections (SI) at Non-Federal Facility Sites	 A-12
            Combined PA/SI Assessments at Non-Federal Facility Sites 	 A-13
            Site Inspection Prioritizations (SIPs) at Non-Federal Facility Sites  	 A-15
            Expanded Site Inspections (ESI) at Non-Federal Facility Sites 	 A-17
            Federal Facility SI/ESI Reviews	 A-18
            Integrated Expanded Site Inspection/Remedial Investigation (ESI/RI)
                at Non-Federal Facility Sites	 A-19
            State Deferral of Non-Federal Facility Sites	 A-21
            Hazard  Ranking System Package (HRS)	 A-22
            Integrated Removal/Remedial Evaluation	 A-23
            NPL Listing	 A-25
            Regional Decisions	,	 A-26
            Support Agency Assistance	 A-27
            Technical Assistance	 A-27
                                                                                                  July 1, 1998

-------
OSWER Directive 9200.3-14-1E
                                    Appendix A
                   Site Screening and Assessment/Regional Decision
                                Targets and Measures

                                   List of Exhibits
EXHIBIT A. I SITE SCREENING AND ASSESSMENT/REGIONAL DECISION ACTIVITIES	  A-4

EXHIBIT A.2 SITE SCREENING AND ASSESSMENT/REGIONAL
       DECISION PLANNING REQUIREMENTS  	  A-28
July 1, 1998

-------
                                                                          OS WER Directive 9200.3-14- IE

                                            APPENDIX A
              SITE SCREENING AND ASSESSMENT/REGIONAL DECISION
                             FY 99/00 TARGETS AND MEASURES

REINVENTING SITE ASSESSMENT

    Historically, the site assessment process consisted of completing Preliminary Assessment (PA), Site Inspection (SI),
and Hazard Ranking System (HRS) activities as needed, for the purpose of determining whether to place sites  on the
National Priorities List (NPL). EPA has been revisiting this process and purpose due to several developments including:
1) the need to encourage Brownfields redevelopment; 2) the unintended stigma associated with adding a site  into
WasteLAN; and 3) the increased expertise of States and Tribes in the Superfund program.  EPA has been implementing
various site assessment pilots to aid in developing a more efficient and effective Superfund site assessment program with
the overall purpose of determining the most appropriate cleanup mechanism for sites [e.g., NPL, State Voluntary Cleanup
Program (VCP), State  or federally implemented Resource Conservation and Recovery Act (RCRA) programs, etc.]. Key
goals of the pilots are to give States increased responsibility, encourage early/more efficient cleanups, reduce costs, and
promote environmental recovery and economic revitalization. Regions should follow the traditional site assessment
process for sites listed in WasteLAN unless sites are being addressed through approved pilots.


SITE ASSESSMENT BACKLOGS

    A key function of HQ is to report national progress made in the site assessment program. Workload estimates are
critical indicators of future program needs. HQ captures these workload estimates by identifying the number of sites at
various stages in the site assessment pipeline. These stages are commonly referred to as "backlogs".  For example, sites
needing completion of a CERCLA preliminary assessment are collectively termed the "PA Backlog".  Throughout this
appendix, the  derivation of backlogs used by HQ is provided for each action type; however, the NPL eligible backlog
is made up of sites spanning several different action types.  HQ derivation of the NPL eligible backlog consists of sites
where:

•   Site inspections or more comprehensive assessments (e.g., expanded site inspections) have been  recorded in
    WasteLAN with actual completion dates; or

•   A preliminary or final Hazard Ranking System (HRS) package generates a score equal to or greater than 28.5; or

•   The last assessment completed at the site has a decision of Low (L), High (H), Recommended for HRS Scoring (G),
    Being considered for proposal to the NPL (O); or

•   The site has not been proposed to the NPL; or

•   The site is not captured in any other assessment backlog.
                                                 A-l                                       July 1, 1998

-------
OSWER Directive 9200.3-14-1E

OVERVIEW OF FY 99/00 SITE SCREENING AND ASSESSMENT/REGIONAL
DECISION TARGETS AND MEASURES

    The Superfund Comprehensive Accomplishments Plan (SCAP) is used by the Assistant Administrator for the Office
of Solid Waste and Emergency Response (AA SWER), Assistant Administrator for the Office of Enforcement and
Compliance Assurance (AA OECA), and senior Superfund managers to monitor the progress each Region is making
towards achieving the  Government Performance and Results Act (GPRA) targets and annual performance goals. In
addition, SCAP will continue to be used as an internal management tool'to project and track activities that contribute
to these GPRA goals and support resource allocation.  The program will set national goals based on historical
performance and performance expectations within a limited budget for the performance goals in GPRA and  track
accomplishments  in  the activities contributing  to those goals.    Regions should continue to plan  and report
accomplishments in WasteLAN as they have traditionally.

    To more clearly reflect the relationship between GPRA and  the SCAP process, targets  (GPRA targets/annual
performance goals) and internal measures (GPRA and program measures) are defined as follows:

•   GPRA Targets/Annual Performance Goals are a subset of the overall planning and budgeting information that
    has traditionally been tracked  by the Superfund program offices. They are numerical goals that are established
    nationally prior to the start of the operating year; for example, 136 construction completions at Superfund  National
    Priorities List (NPL) sites in FY 99.

•   Measuresare activities deemed essential to tracking overall program progress. There are two types of measures:
    GPRA measures and program measures. GPRA measures simply track the number of actions that occur throughout
    the year (accomplishments) and are used to evaluate program progress; for example, the  number of agreements
    negotiated with States and Tribes.  Program measures are used to project the number of actions that each Region
    expects to perform during the year using anticipated resources; for example, the number of sites where EPA settled
    based on ability-to-pay determinations.

    The following pages contain,  in pipeline order, the definitions of the FY  99/00 site screening and assessment/
Brownfields targets and measures.  Exhibit A.I  displays the full list of site screening and assessment and Brownfields
activities defined in this Appendix.  Exhibit A.2,  at the end of this Appendix, identifies planning requirements for all site
screening and  assessment/Brownfields activities.
 GPRA AND SITE ASSESSMENT

     The current GPRA subobjective for site assessment is:

     "By 2005, EPA and its partners will decide whether Federal Superfund cleanup is needed at 85 percent of waste sites
 entered  into WasteLAN, using a decision-making  process that  assesses  potential risk  to human health and the
 environment, and which incorporates tribal cultural and subsistence value".
 July 1, 1998                                      A-2

-------
                                                                            OSWER Directive 9200.3-14-1E

 There is one aspect of Site Assessment included in the Agency's GPRA key performance measure relating to site
 assessment.  This measure focuses on the percent of sites brought to the attention of the Superfund Program where final
 assessment decisions have been made. The formula to derive this key measure is:

      # sites listed on the NPL+ # non-NPL sites with NFRAP/deferred/remediated decisions via State or Tribal
                          program/aggregated decisions/referred to removal program1
                             Total sites currently or formerly listed in WasteLAN

     The numerator in the above formula represents sites with final assessment decisions. Since sites may receive
 multiple assessment actions of the same type (e.g., as an initial preliminary assessment conducted in  1995, and a
 subsequent preliminary assessment conducted in 1997), final decisions focus on the last completed assessment action
 at a site (e.g., the 1997 preliminary assessment decision is used, not the 1995 decision).

     The following performance measures will be used in addition to the key measure shown above to support more
 comprehensive reporting of site assessment accomplishments in a given year:

 •    The number of sites pre-screened for WasteLAN entry per year;

 •    The number of sites added to WasteLAN per year;

 •    The total number of sites archived as of end-of-year;

 •    The number of sites with assessment work still  underway.

 SUPERFUND DURATIONS

    The Superfund program  has  tracked remedial pipeline durations for several years in  the  Superfund Senior
 Management Reports as  part of Superfund progress evaluation.  As program management  emphasis shifts from
 administrative progress to more comprehensive measurement of program progress, OERR will track additional durations
 besides the remedial pipeline  durations.  These durations include:  Engineering Evaluation/Cost  Analysis (EE/CA)
 duration; Expanded Site Inspection/Remedial  Investigation (ESI/RI) duration; removal  duration; average duration
 between  proposed listing to first removal or remedial action; and average duration from action memorandum to first
 removal  completion.  In FY 99/00, OERR will track the average action and site durations presented below.  These
 durations are not SCAP measures; they are presented here for informational purposes only.  HQ is responsible for
 calculating and publishing the durations in the Superfund Senior Management Reports; however, Regions are responsible
 for entering and maintaining accurate data from which durations can be derived.

    The durations only cover non-Federal facility actions and are calculated based on actual dates.. In addition, they do
 not include takeovers (within actions) or phased actions.

 •   Average Remedial Investigation/Feasibility Study (RI/FS) Duration

 •   Duration from  Record of Decision (ROD)  to Remedial Design (RD) Start

 •   Duration from  ROD to Remedial Action (RA)  Start
         NPL includes sites on the final NPL, sites deleted or withdrawn from final NPL, and final NPL sites
deferred to other program authorities (i.e., RCRA). NFRAP includes non-NPL sites with "no further remedial action
planned" decisions and sites removed from the proposed NPL with no further remedial action planned. Deferred
includes non-NPL sites deferred to RCRA, Nuclear Regulatory Commission (NRC), State, or other Federal
authorities for further action. Aggregated includes sites aggregated into existing NPL sites.

                                                  A-3                                        July 1, 1998

-------
OSWER Directive 9200.3-14-IE

                                   EXHIBIT A.I
     SITE SCREENING AND ASSESSMENT/REGIONAL DECISION ACTIVITIES
ACTIVITY
Brownfields Assessment
Pre-CERCLIS Screening Assessment
Site Discovery
Sites Archived
Preliminary Assessment (PA) Starts at Non-Federal Facility Sites
Federal Facility PA Review Starts
PA Completions at Non-Federal Facility Sites
Federal Facility PA Review Completions
Site Inspection (SI) Starts at Non-Federal Facility Sites
SI Completions at Non-Federal Facility Sites
Combined PA/SI Assessment Starts at Non-Federal Facilities
Combined PA/SI Assessment Completions at Non-Federal Facilities
Site Inspection Prioritization (SIP) Starts at Non-Federal Facility
Sites
SIP Completions at Non-Federal Facility Sites
Expanded Site Inspection (ESI) Starts at Non-Federal Facility Sites
ESI Completions at Non-Federal Facility Sites
Federal Facility SI/ESI Review Starts
Federal Facility SI/ESI Review Completions
Integrated ESI/RI Starts at Non-Federal Facility Sites
Integrated ESI/RI Completions at Non-Federal Facility Sites
State Deferral of Non-Federal Facility Sites
Hazard Ranking System (HRS) Package Starts (Non-Federal Facility
and Federal Facility)
HRS Package Completions (Non-Federal Facility and Federal
Facility)
Integrated Removal Assessment & PA Starts at Non-Federal Facility
Sites
GPRA
Target/Annual
Performance Goal
























MEASURE .
GPRA •;• :•?!

/
/
s




















| PROGRAM
/



S
/
S
/
/
s
s
s
s
s
s
s
s
s
/
s
s
/
/
s
  NOTE:  Accomplishments are pulled from WasteLAN on a semi-annual basis.
July 1, 1998
A-4

-------
                                                                       OSWER Directive 9200.3-14-IE
                                      EXHIBIT A.1(CONT'D)
             SITE SCREENING AND ASSESSMENT/REGIONAL DECISION ACTIVITIES
*,. ' ACTIVITY 1 " " >" -'^ ^
"i ' 
-------
OSWER Directive 9200.3-14-1E

SITE SCREENING AND ASSESSMENT/REGIONAL DECISION DEFINITIONS
BROWNFIELDS ASSESSMENT

Definition:
"A Brovvnfields Site Assessment is a site characterization activity used to address property transfer due diligence and
encompasses one or more of the following phases or activities: (1) site background and historical investigation to identify
past uses of the property to identify potential sources of contamination and waste generation activities (e.g., Preliminary
Assessment  or  Phase I);  (2) field investigation and sampling activities  to  identify contaminated areas (e.g., Site
Investigation or Phase II); (3) study to identify possible remediation options incorporating information on future uses
and redevelopment plans; and (4) development of cost estimates for remediation. The Brownfields Site Assessment is
designed and implemented to meet applicable laws and regulations, including state cleanup standards." (Source: Quality
Assurance for  Brownfields Site  Assessments Work Group, "Quality  Assurance Requirements  for Conducting
Brownfields Site Assessments",  DRAFT February,  1998.)  Types of  assessment activities captured  under the
"Brownfields Assessment" label include ASTM-based Phase I  and Phase II activities or hybrid versions thereof.

Generally, a Phase I assessment involves collecting available information about a site to identify the presence or likely
presence of an existing or past release of a hazardous substance  into the ground (i.e., soil), groundwater, surface water,
or air.  A Phase I assessment determines whether there is evidence or an indication that hazardous substance, pollutants,
or contaminants were ever  handled or disposed at the site either currently or  in the past. A Phase II assessment involves
collecting and analyzing waste and environmental samples to determine the hazardous substances present at a site and
whether they are being released into the environment.  Both Phase I and Phase II assessments identify site conditions
posing immediate health or environmental threats that require emergency response actions.

Definition of Accomplishment:
Brownfields assessments are complete when a determination is made whether hazardous substances are present at the
site and whether they are being released into the environment. These determinations are documented by a notification
in the site file describing the activities that were performed.  Regions should  enter the total number of Phase I and Phase
II and other Brownfields assessments that have been performed through the Non-Site Incident (NSI) screens in Program
Management.

Changes in Definition FY 98 - FY 99/00:
None.

Special Planning/Reporting Requirements:
Brownfields Assessments are reported non-site specifically in WasteLAN. The Region should enter the total number
of Brownfields Assessments (Phase I, Phase II, or other assessments) conducted each quarter. Brownfields Assessments
is a program measure.


PRE-CERCLIS SCREENING ASSESSMENTS

Definition:
Pre-CERCLIS screening is the process of reviewing data on a potential site to determine whether it should be entered
into WasteLAN for further evaluation. The process can be initiated through the use of several mechanisms, such as a
phone call or referral by a State or other Federal agency.

Definition of Accomplishment:
The Region will maintain a record upon completion of a pre-CERCLIS screening action containing the decision on
whether the site requires NPL assessment or removal activities under the Federal Superfund program.  The date of this
decision should be entered as the Site Discovery date if the site needs NPL assessment work or if the site  needs both NPL
assessment and removal work. The date of this decision should be entered  as the Site Initiation date if only Superfund
removal work is needed.  If no Superfund removal or NPL assessment work is needed, the site discovery date and the

July 1, 1998                                      A-6

-------
                                                                           OSWER Directive 9200.3- 14- IE

 site initiation date do not need to be entered. Information management aspects of recording pre-CERCLIS screening
 activities is still under development. Currently, Regions should enter the total number of sites screened, including those
 which are put into WasteLAN and those which are not, through the NSI screens in Program Management.

 If the decision is to add the site to WasteLAN, the Region should also add the Site Discovery action into WasteLAN
 (see below for definition).

 Changes in Definition FY 98 - FY 99/00:
 Change none.


 Special Planning/Reporting Requirements:
 Pre-CERCLIS Screening Assessments are reported non-site specifically in WasteLAN. The Region should enter the
 number of Pre-CERCLIS Screening Assessments performed each quarter.  If the decision is made that the site requires
 NPL assessment and/or cleanup under CERCLA authority, it should be entered into WasteLAN with a Discovery action.
 The Region will maintain a record based on a pre-screening action.  This is a GPRA measure.
 SITE DISCOVERY
                                                                     %
 Definition:
 Site discovery is the process by which a potential hazardous waste site is entered into WasteLAN for NPL assessment
 activities. All sites moving through the NPL assessment process must have a discovery action and actual completion
 date the site was discovered documented in WasteLAN. Entry of the site discovery date initiates the NPL assessment
 process and places the site on the Preliminary Assessment backlog.

 Backlogs
 Site discovery backlogs consist of those sites that have a pre-CERCLIS screening assessment (Action Name = Pre-
 CERCLIS Surveys) with an actual completion date; no pre-CERCLIS screening qualifier exists, and no other assessment
 or removal actions are recorded for the site.

 Definition of Accomplishment:
 Site discovery of non-Federal facilities  is the date the Region completes the pre-CERCLIS screening activities, and
 documents the decision  that the site warrants Superfund NPL assessment and/or cleanup attention.  The site discovery
 date for Federal facilities is the date the site is formally added to the Federal Facilities Hazardous Waste Compliance
 Docket indicating Superfund involvement is required. The Site Name and Discovery Date must be entered into
 WasteLAN for both Federal  and non-Federal sites.

 Changes in Definition FY 98  - FY  99/00:
 None.

 Special Planning/Reporting Requirements:
 Actual start and planning dates  are not required for site discovery.  Multiple discovery actions are not allowed  Site
 discovery is a GPRA measure.

Note: A separate field has been added to WasteLAN to record site initiation dates for removal-only sites. Sites that are
subject only to removal interest generally do not require a discovery date.  An exception is where a large scale removal
action has been completed and  the Region seeks credit for a non-NPL  site completion.  Non-NPL site completions
require site assessment review indicating  the site has no  further remedial actions planned. The discovery date for sites
referred from removal to assessment should be the date the referral decision is made.
                                                 A-?                                       July 1, 1998

-------
OSWER Directive 9200.3-14-1E

 SITES ARCHIVED

Definition:
Archiving represents a site-wide decision or status indicating that no further interest exists at the site under the Federal
Superfund program based on available information. It is a comprehensive decision in that archive status means that there
are no further site assessment, remedial, removal, enforcement, cost recovery, or oversight activities being planned or
conducted at the site.

Backlogs
The Archive site backlog consists of the potential archive candidate sites described above.

Definition of Accomplishment:
An archive decision is recorded in WasteLAN at the site level. To receive credit for an archive decision, the Archive
Indicator (Archive IND) must be checked, and the "Archive Date" entered.  A note must be prepared and placed in the
site file explaining that no further Federal Superfund interest exists at the site based on available information. The date
of the note is the Archive Date and automatically generates the Archive Indicator in WasteLAN. Although the underlying
basis for archiving a site is  whether or not Federal Superfund interest exists, several categories of sites are used to
generate lists of potential archive candidate sites. Based on review of sites in these categories, Regions should update
the " Archive IND" and "Archive Date" field as appropriate in a timely fashion. These categories are:

•  Sites that have only completed the site assessment process and have either been given a No Further Remedial Action
   Planned (NFRAP) or Deferred decision at the conclusion of the last completed site assessment event, and no other
   Federal Superfund activity is anticipated;

 •  Sites that have completed both the removal and site assessment process, or have completed the removal process and
   require   no  site assessment work  (removal-only sites),  and which have completed all  related  oversight, cost
   recovery/other enforcement work, and have no further Federal Superfund activity anticipated;

 •  Sites removed from the proposed NPL or final  NPL  (e.g., as a result of a lawsuit) that have no  further Federal
   Superfund activity anticipated;

 •  Sites deleted from the final NPL that have no further Federal Superfund activity anticipated; and

 •  Sites that have been entered into WasteLAN via entry of a site discovery and/or site initiation date which have not
   had any work started and, based on review, do not warrant any type of additional Superfund activity.  An abbreviated
   preliminary assessment (PA) should be completed for these sites prior to designating archive status.

 Note: NPL sites that have  achieved construction completion should not  be archived until a Notice of Deletion is
 published in the Federal Register, the Final  Deletion from NPL action with an actual completion date is entered into
 WasteLAN, and the NPL Status is changed from an "Currently on the Final NPL" to a "Deleted from the Final NPL".

 If site conditions change and/or new information becomes available on a site archived from WasteLAN, and the data
 indicate additional Superfund involvement is warranted, the site should be returned to WasteLAN.  This is accomplished
 by deleting the date in the Archive Date field. The Archive Indicator will automatically be deleted.  A note explaining
 why the site was returned  to WasteLAN must be prepared and placed in the site file.

 Changes in Definition FY 98 - FY  99/00:
 Sites Archived is a GPRA measure. NPL sites that have achieved construction completion should not be archived until
 the Notice of Deletion is published in  the Federal Register.
 July 1,1998                                        A-8

-------
                                                                           OS WER Directive 9200.3-14-IE

 Special Planning/Reporting Requirements:
 Planning dates for archiving sites are not available. It is important to note that an archive decision is not the same as no
 further remedial action planned (NFRAP) decision. [A NFRAP decision is recorded as an Action Qualifier, is made only
 at the conclusion of a site assessment action, and does not take into account any other Superfund programmatic activity
 that may be going on at a site such as removals or cost recovery.] Archived sites is a GPRA measure for both non-
 Federal and Federal facilities.
 PRELIMINARY ASSESSMENTS (PA) AT NON-FEDERAL FACILITY SITES

 Definition:
 A Preliminary Assessment (Action Name = Preliminary Assessment) is often the first phase of the NPL assessment
 process following site discovery.  The PA is used to determine what steps, if any, need to occur next at the site.  Federal,
 State, and local government files, geological and hydrological data, and data concerning site practices are reviewed to
 complete the PA report.  An on- or off-site reconnaissance also may be conducted, although it is not required.

 Regions may combine PA and SI activities where warranted by site conditions to reduce repetitive tasks and ultimately
 costs.  The combining of PA and SI activities is known as a "Combined Assessment" and is discussed in a  separate
 measure below. The decision to perfrom a "Combined Assessment" is made when site assessment activities are initiated.

 With the implementation of Superfund Accelerated Cleanup Model (SACM), Regions also have been encouraged to
 further reduce repetitive tasks and costs by combining site assessment and removal evaluation activities where warranted
 by site conditions. This integrated removal/remedial evaluation, is further discussed in a separate measure, below.

 Backlogs
 The Preliminary Assessment backlog consists of sites with discovery completion dates and no  other assessment
 completion dates recorded in WasteLAN.

 Definition of Accomplishment:
 PA Starts - A PA (Action  Name  = Preliminary Assessment) is started when the Region begins collecting data and
 performing other tasks related to development of the PA report; or when the Region signs a letter,  form, or memo to the
 EPA contractor or State/Tribal government (where applicable), requesting performance of a PA at a specific site or group
 of sites; or when EPA receives written confirmation from a State/Tribal government that the State/Tribal government
 will conduct  the PA; and WasteLAN contains the actual PA start date (Actual Start) and an action lead of: "Fund-
 Financed (F)"; "EPA-In House (EP)"; "State (S)"; or "Tribal (TR)". PA start dates are required and are used by HQ as
 an internal planning measure.

PA  Completions - A Preliminary Assessment (Action Name = Preliminary Assessment) is completed when:

 • A PA Report has been developed by EPA; or received by the Region from the Federal  contractor or State/Tribal
  government; and  the appropriate Regional official signs a letter, form, or memo approving the PA report.

• The PA actual completion date is the date the PA report is approved; and

• WasteLAN contains the actual PA completion date (Actual Complete),  a valid lead (Lead), and a "decision" on
  whether further activities are necessary in the Qualifier field; and

• The decision is documented by completing the Site Decision Form 9100-3  in WasteLAN, or an equivalent document.
  The decision document must be  printed, signed by the appropriate Regional official,  and placed in the file.
                                                 A-9                                       July 1, 1998

-------
OSWER Directive 9200.3-14-IE

Valid decisions to be recorded in WasteLAN upon completion of the PA include:

(H) High - Higher priority for further assessment Note: The next stage of assessment, would typically be an SI (Action
Name = Site Inspection); or

(L) Low - Lower priority for further assessment; or

(N) - No further remedial action planned; or

(D) - Deferred to RCRA (Subtitle C) or the NRC; or

(A) - Site is being addressed as part of a NPL site. A site having qualifier of "Aggregate" should have an NPL Status
Indicator (Site NPL Status) of 'A' and a valid value in the Site Parent ID field ; or

(F) - Referred to the removal program with further remedial assessment needed; or

(W) - Referred to the removal program with no further remedial assessment needed.

There are  instances when an abbreviated PA, as opposed to a full PA, is necessary. Sites in the WasteLAN inventory
determined ineligible for Superfund response by Regional EPA site assessment personnel, and purported sites that are
determined not to actually exist, do not undergo a complete PA. For such sites, the typical PA reporting requirements
are abbreviated. The narrative report remains  a requirement; however it may be limited to the Introduction Site
Description, Operational History, and Waste Characteristics, and Summary and Conclusions sections. The narrative
should present and fully support all of the information that led to EPA's decision to cease PA investigation at the site.
As with a full PA report, factual statements within the narrative must be documented, and appropriate references
of excerpts must be attached.

Only the first two pages of the PA data and site characteristics form, are required for abbreviated PA sites. These pages
provide necessary administrative information and general descriptive information about the site and associated wastes
(if any). In addition,  PA scoresheets or computerized PA-Score site scoring need not be completed for sites with
abbreviated Pas. The scope of work for an abbreviated PA is still under development.

Changes in Definition FY  98 - FY 99/00:
Created separate measures for Combined PA/SIs and Integrated removal/remedial evaluations.

Special Planning/Reporting Requirements:
Regions should attempt to complete PAs at non-Federal Facility sites listed in WasteLAN within one year of the site
discovery completion date.

For budget and resource allocations, separate projections must be made for EPA contractor, State, Tribal, and EPA in-
house  PA starts. PA starts and completions (Actual Start and Complete) are reported site-specifically in WasteLAN.
Only the first PA start  at a site will be given credit for SCAP funding purposes. Preliminary Assessment starts at non-
Federal Facility sites  is a program measure.  Preliminary Assessment completions at non-Federal  Facility sites is a
program measure.


FEDERAL FACILITY PRELIMINARY ASSESSMENT REVIEWS

Definition:
A Federal Facility Preliminary Assessment  Review is a quality assurance review qf a PA report submitted by another
Federal Agency. EPA's involvement in PAs at Federal facilities differs from that at non-Federal facilities.  While EPA
 July 1, 1998                                      A-10

-------
                                                                            OSWER Directive 9200.3-14-1E

  conducts or funds development of PAs at non-Federal facilities, EPA's role at Federal facilities is limited to reviewing
  PA reports developed and submitted by the Federal agencies responsible for a given Federal facility. Upon reviewing
  the PA for completeness, and working with the other Federal agency to address any deficiencies, EPA then determines
  what next steps are appropriate with respect to NPL listing.

  Backlogs
  The Federal Facility PA Review backlog consists of sites with discovery completion dates and no other assessment
  completion dates recorded in WasteLAN.

  Definition of Accomplishment:
  Federal Facility PA Review Starts - A Federal Facility PA Review (Action Name = Federal Facility Preliminary
  Assessment Review) is started when the EPA starts an in-house review of the Federal facility PA or sends a letter, form,
  or memo to the EPA contractor requesting review of the Federal facility PA report, and WasteLAN contains the actual
  PA start date (Actual Start) and an action lead of "Fund-financed (F)", or "EPA-In House (EP)".

 Federal Facility PA Review Completions - A Federal Facility PA Review (Action Name = Federal Facility Preliminary
 Assessment Review) is completed when:

 • The appropriate Regional official signs a letter, form, or memo approving the PA report.

 • The Federal Facility Preliminary Assessment Review actual completion date is the date the Federal facility PA report
   is approved.

 • WasteLAN contains the actual Federal Facility Preliminary Assessment Review completion date (Actual Complete),
   a valid lead and a "decision" on whether further activities are necessary in the Qualifier field; and

 • The decision is documented by completing the Site Decision Form 9100-3 in WasteLAN, or an equivalent document.
   The decision document must be printed, signed by the appropriate Regional official, and placed in the file.

 Valid decisions to be recorded in WasteLAN upon completion of a Federal  facility PA Review include:

 (H) High - Higher priority for further assessment Note: The next stage of assessment would typically be an SI (Action
 Name = Site Inspection); or

 (L) Low - Lower priority for further assessment; or

 (N) - No further remedial action planned; or

 (A) - Site is being addressed as part of an NPL site. A site having qualifier of  'A' should have an NPL Status Indicator
 (Site NPL Status) of 'A' and  a valid value in  the Site Parent ID field; or

 (D) - Deferred to RCRA (Subtitle C) or the NRC.

 Changes in Definition FY 98 - FY 99/00:
 Changed the qualifiers that are valid at the completion of a Federal facility PA review. Added language re«ardin" a new
 subAction that will be added  into WasteLAN.                                                        °

 Special Planning/Reporting Requirements:
 Regions should attempt to complete  PA reviews at Federal Facility sites listed in  WasteLAN within  18 months of the
 site discovery completion date.  Federal facility PA review starts and completions are reported site-specifically in
WasteLAN. Federal Facility Preliminary Assessment Review starts and completions are program measures.

If the Federal facility PA report does not provide sufficient information to make a NPL decision, the report should be


                                                 A-JI                                       July 1,  1998

-------
OSWER Directive 9200.3-14-IE

referred back to the Federal facility. A new subAction will be added to WasteLAN to track site assessment reports
referred back to the Federal facility. The actual completion date and qualifier for the Federal Facility Preliminary
Assessment Review should not be entered until all the report deficiencies have been addressed.


SITE INSPECTIONS (SI) AT NON-FEDERAL FACILITY SITES

Definition:
The SI (Action Name = Site Inspection) involves the collection of field data from a suspected hazardous waste site to
confirm or deny the presence of contamination and to  further characterize contaminants, migration pathways, and
background contaminant levels. The SI serves as a further screening activity to determine what steps, if any, need to
occur next at the site.  HQ recognizes Field Analytical Sampling  (FAS) techniques are a cost and time effective
alternative to the current Contract Laboratory Program (CLP) only process.  Regions are encouraged to move
implementation of FAS techniques from the pilot stage to standard operating procedures and employ these techniques
wherever practical during conduct of SI activities.

Regions may combine PA and SI activities where warranted by a site conditions to reduce repetitive tasks and, ultimately
costs.  The combining of PA and SI activities is known as a "Combined Assessment" and is discussed in a separate
measure. The decision to perform a "Combined Assessment" is made when site assessment activities are initiated.

Regions have also been encouraged to further reduce repetitive tasks and costs by combining site assessment and removal
evaluation activities where warranted by  site conditions. This "Integrated Removal/Remedial Evaluation" activity is
discussed in a separate measure.

Backlogs
The Site Inspection backlog consists of sites with a PA completion date, a PA decision of High (H), Low (L), or Referred
to Removal, with further remedial assessment needed (F),  and  the PA is the last completed site assessment action
recorded in WasteLAN.

Definition of Accomplishment:
SI Starts - A SI (Action Name = Site Inspection) start date at a non-Federal facility site is defined as the date when EPA
or the State/Tribal government signs a letter, memo or form approving the site-specific SI work plan, or a Technical
Direction Document (TDD) is issued to  the contractor at a site (refer to OSWER Publication #9345.1-03  FS for further
guidance on defining SI starts) and  WasteLAN contains the actual  SI start date (Actual Start) and an action lead of:
"Fund-Financed (F)"; "EPA-In House (EP)"; "State (S)"; or "Tribal (TR)".  SI start dates are required.

SI Completions - A SI (Action Name = Site Inspection) is completed when:

•  A SI Report has been generated by EPA; or  received by the Region from the Federal contractor or State/Tribal
   government; and the appropriate Regional official signs a letter, form, or memo approving the SI report.

•  The SI actual completion date is the date the PA report is approved; and

 •  WasteLAN contains the actual SI completion date (Actual Complete), a valid lead (Lead), and a "decision" on whether
   further activities are necessary in the Qualifier field; and

 •  The decision is documented by completing the Site Decision Form 9100-3 in WasteLAN, or an equivalent document.
   The decision document must be printed, signed by the appropriate Regional official, and placed in the file.
 July 1,1998                                       A-12

-------
                                                                            OSWER Directive 9200.3-14-IE

  activities must be recorded with the SIP and not at the last SI as previously required. Site Inspection Prioritization starts
  at non-Federal facility sites is a program measure. Site Inspection Prioritization completions at non-Federal facility sites
  is a program measure.



 EXPANDED SITE INSPECTIONS (ESI) AT NON-FEDERAL FACILITY SITES

 Definition:
 The ESI (Action Name = Expanded Site Inspection) collects additional data beyond that collected in the SI to evaluate
 the site for HRS scoring.  ESIs are reserved for more complex sites that cannot be adequately characterized using
 standard SI methodologies.  Installation of groundwater monitoring wells is typical of activities performed under the ESI.

 Regions also have been encouraged to further reduce repetitive tasks and costs by combining site assessment and removal
 evaluation activities where warranted by site conditions. This is called an integrated removal/remedial evaluation (Action
 Name = Integrated Assessment). Please note  that when ESIs are performed as part of an  Integrated Assessment
 information should be entered for both the Integrated Assessment and ESI  actions.

 HQ recognizes FAS techniques are a cost and time effective alternative to the current CLP only process Regions are
 encouraged to move implementation of FAS techniques from the pilot stage to standard operating procedures and employ
 these techniques wherever practical during conduct of ESI activities.

 Backlogs
 The Expanded Site Inspection backlog consists of sites where the last site assessment activity recorded at a site is an ESI
 with an actual start date but no actual completion date.

 Definition of Accomplishment:
 ESI Starts - An  ESI (Action Name = Expanded Site Inspection) start is defined as the date when EPA or State/Tribal
 government signs a letter, memo or form approving the site specific ESI work plan or a Technical Direction Document
 is issued to the contractor at a site and WasteLAN contains the actual ESI start date (Actual Start) and an action lead
 (Lead) of: "Fund-Financed (F)"; "EPA-In House (EP)"; "State (S)"; or "Tribal (TR)".

 ESI Completions - An ESI (Action Name = Expanded Site Inspection) is complete when:

 •  An ESI Report has been developed by EPA; or received by the Region from the federal contractor; or the State/Tribal
   government; and the appropriate Regional official signs a letter, form, or memo approving the ESI report;

 •  The ESI actual completion date is the date the ESI report is approved; and

 •  WasteLAN contains the actual  ESI completion date (Actual Complete), a valid lead (Lead), and a valid "decision"
   on whether further activities are necessary in the Qualifier field; and

 •  The decision is documented by completing the Site Decision  Form 9100-3  in WasteLAN, or an equivalent document
   The decision document must be printed, signed by the appropriate Regional official, and placed in the file.

 Valid decisions to be recorded upon completion of the ESI include:

 •  (G) - Recommended for HRS Scoring (i.e., development of HRS package, Action Name = Hazard Rankin" System
   Score Determi); or

•  (L) Low - Lower priority for further assessment; or

•  (N) - No further remedial action planned; or
                                                 A'17                                       July 1, 1998

-------
OSWER Directive 9200.3-14-1E

• (D) - Deferred to RCRA (Subtitle C) or the NRC; or

• (A) - Site is being addressed as part of an NPL site. A site having an event qualifier of 'A' should have an NPL Status
  Indicator (Site NPL Status) of 'A' and a valid value in the Site Parent ID field; or

• (F) - Referred to the removal program with further remedial assessment needed; or

• (W) - Referred to the removal program with no further remedial assessment needed; or

• (Code Pending) - Site is being remediated via a State or Tribal program.

Changes in Definition FY 98 - FY 99/00:
Added new action qualifier values.

Special Planning/Reporting Requirements:
Planning dates are not required for ESIs. Actual start and completion dates are required for ESIs.  ESI starts (Actual
Start) and completions (Actual Complete) are reported site-specifically in WasteLAN.  Only the first ESI start at a site
will be given  credit for SCAP funding purposes. ESI Starts is a program measure for non-Federal facilities.  ESI
Completions is a program measure.


FEDERAL FACILITY SI/ESI REVIEWS

 Definition:
 Federal facility SI/ESI Reviews (Action Names = Federal Facility SI Review and Federal Facility ESI Review) are an
 EPA quality assurance  review of a SI and/or ESI report submitted by another Federal agency.  EPA's involvement in
 SI  and ESI activities at Federal facilities differs from that at non-Federal facilities.  While EPA conducts or funds
 development of Sis and ESIs at non-Federal facilities, EPA's role at Federal facilities is limited to reviewing SI and ESI
 reports developed and submitted by the Federal agencies responsible for a given Federal facility. Upon reviewing the
 SI  and/or ESI for completeness, and working with the other Federal agency to address any deficiencies, EPA then
 determines what next steps are appropriate with respect to NPL listing.

 Backlogs
 The Federal Facility SI/ESI Review backlog is incorporated into the separate SI and ESI backlogs described above.


 Definition of Accomplishment:
 Federal Facility SI/ESI Review Starts - Federal facility SI/ESI review (Action Names = Federal Facility SI Review and
 Federal Facility ESI Review) are started when EPA starts in-house review of the Federal Facility SI or ESI report, or
 sends a letter, form, or memo to the EPA contractor requesting review of the Federal Facility SI or ESI report; and
 WasteLAN contains the actual Federal Facility SI/ESI Review start date (Actual Start) and an action lead  (Lead) of
 "Fund-Financed (F)" or "EPA-In House (EP)".

 Federal Facility SI/ESI Review Completions - A Federal Facility SI/ESI Review (Action Names =Federal Facility SI
 Review and Federal Facility ESI Review) are completed when:

 •  The appropriate Regional official signs a letter, form, or memo approving the Federal facility SI or ESI report.

 «  The date the Federal facility SI report or the Federal facility ESI report is approved is entered into WasteLAN as the
    actual completion date of the Federal Facility, SI or ESI report; and

 •  WasteLAN contains the actual completion date (Actual Complete) of the Federal Facility SI Review and/or Federal
    Facility ESI Review, a valid lead (Lead), and a valid "decision" on whether further activities are necessary in the
    Qualifier field; and

 July 1, 1998                                       A-18

-------
                                                                           OSWER Directive 9200.3-14-IE

  •  The decision is documented by completing the Site Decision Form 9100-3 in WasteLAN, or an equivalent document.
    The decision document must be printed, signed by the appropriate Regional official, and placed in the file.

  Valid decisions to be recorded upon completion of Federal facility SI/ESI reviews include:

  (H) High - Higher priority for further evaluation/HRS Scoring [applicable to Federal Facility SI reviews only]; or

  (G) - Recommended for HRS Scoring [applicable to Federal Facility ESI reviews only]; or

  (L) Low - Lower priority for further assessment; or

  (N) - No further remedial action planned; or

  (A) - Site is being addressed as part of an NPL site. A site having an event qualifier of 'A' should have an NPL Status
 Indicator (Site NPL Status) of 'A' and a valid value in the Site Parent ID field; or

 (D) - Deferred to RCRA or NRC.

 Changes in Definition FY 98 - FY 99/00:
 Federal Facility SI/ESI Reviews is a new measure for FY 99/00.

 Special Planning/Reporting  Requirements:
 Planning dates are not required for Federal facility SI/ESI reviews. Actual start and completion dates are required for
 Federal facility SI/ESI reviews. Federal Facility SI Review starts (Actual Start) and completions (Actual Complete) and
 Federal Facility ESI Review starts (Actual Start) and completions (Actual Complete) are reported site-specifically in
 WasteLAN.  Only the first Federal Facility SI or ESI Review start at a site will be given credit for funding purposes
 Federal Facility SI/ESI Review Starts is a program measure for Federal facility sites. Federal Facility SI/ESI Review
 Completions  is a program measure.



 INTEGRATED EXPANDED SITE INSPECTION/REMEDIAL INVESTIGATION (ESI/RI)
 AT NON-FEDERAL FACILITY SITES

 Definition:
 The integrated ESI/RI (Action Name = ESI/RI) is a SACM-initiated integrated assessment consisting of an ESI and a
 RI. The ESI/RI is used to expedite remedial response by gathering site characterization data common to both ESI and
 RI activities in one step, thereby expediting the later collection of data when comprehensive RI activities are performed.
 The goal of ESI/RIs is to save time and costs characterizing sites when compared to the traditional, sequential ESI-NPL
 Listing-RI process.  ESI/RIs facilitate but do not replace RIs, and are recommended at sites where conditions indicate
 that the HRS score will be above 28.5 and a remedial response will be needed. The RI portion of an ESI/RI is intended
 to be  a site-wide activity. ESI/RIs actions should be entered into WasteLAN at operable unit '00'.

 ESI/RIs may not always be feasible given known site conditions and activities completed to date. In some cases it may
 be more prudent to conduct a separate ESI or RI.  The definitions for RI/FS Completion and RI Completion (see
 definitions in Appendix B are different from the definition  for ESI/RI Completion.  The definition of an  ESI/RI
 Completion is the same as that of an ESI Completion. If an ESI/RI action  is recorded in WasteLAN, a stand-alone ESI
 event (Action  Name = Expanded Site Inspection) should not be recorded at that site.

With the implementation of SACM, Regions have also been encouraged to further reduce repetitive tasks and costs by
combining site assessment and removal evaluation activities where warranted by site conditions.  This is called an
                                                 A'19                                      July 1, 1998

-------
OSWER Directive 9200.3-14-1E

integrated removal/remedial evaluation (Action Name = Integrated Assessment) and is further discussed in a separate
section below. Please note that when ESI/RIs are performed as part of an Integrated Assessment, information should
be entered for both the Integrated Assessment and ESI/RI actions.

HQ recognizes FAS techniques are a cost and time effective alternative to the current CLP only process. Regions are
encouraged to move implementation of FAS techniques from the pilot stage to standard operating procedures and employ
these techniques wherever practical during conduct of ESI/RI activities.

Backlogs
The ESI/RI backlog consists of sites where the last site assessment activity recorded at a site is an ESI/RI with an actual
start date but no actual completion date.

Definition of Accomplishment:
ESI/RI Starts - ESI/RI (Action Name = ESI/RI) start date is defined as the date when EPA approves the site-specific
ESI/RI work plan and WasteLAN contains the actual ESI/RI start date (Actual Start) and  an action lead of: "Fund-
Financed (F)"; "EPA-In House (EP)"; "State (S)"; or "Tribal (TR)".

ESI/RI Completions - An ESI/RI (Action Name =ESI/RI) is complete when:

•  An ESI/RI Report has been reviewed and accepted by the Region and the appropriate Regional official signs a letter,
   form, or memo approving the ESI/RI report.
                                                    .
•  The ESI/RI actual completion date is the date the ESI/RI report is approved; and

•  The following has been recorded in WasteLAN: the actual  ESI/RI completion date (Actual Complete); a valid lead
   (Lead); and a "decision" on whether further activities are necessary in the Qualifier field; and

•  The decision is documented by completing the Site Decision Form 9100-3 in WasteLAN, or an equivalent document.
   The decision document must be printed, signed by the appropriate Regional official, and placed in the file.

Valid decisions to be recorded upon completion of the ESI/RI include:

(G) - Recommended for HRS Scoring (i.e., development of HRS package, Action Name = Hazard Ranking System Score
Dctermi); or

(L) Low - Lower priority for further assessment; or

(N) - No further remedial action planned; or

(A) - Site is being addressed as part of an NPL site. A site having an event qualifier of 'A' should have an NPL Status
Indicator (Site NPL Status) of 'A' and a valid value in the  Site Parent ID field; or

(F) - Referred to the removal program with further remedial assessment needed; or

(W) - Referred to the removal program with no further remedial assessment needed; or

(Code Pending) - Site is being remediated via a State or Tribal program.

Changes in Definition FY  98 - FY 99/00:
Added new action qualifier value.
 July 1, 1998                                       A-20

-------
OSWER Directive 9200.3-14-1E

Definition of Accomplishment:
SIP Starts - A SIP start is defined as the date the Region signs a letter, form, or memo requesting a SIP be performed
at a specific site. The date should be entered into WasteLAN as the actual start date (Actual Start) of the SIP SubAction.
SIP start dates are required, and are used by HQ as a program measure.

NOTE: Start dates cannot be entered into WasteLAN for SIPs.  Changes are needed in WasteLAN before this date can
be reported.

SIP Completions - A SIP (SubAction Name = Site Inspection Prioritization) is complete when:

• • A SIP Report has been developed by EPA; or received by the Region from the Federal contractor or State/Tribal
  government; and the appropriate Regional official signs a letter, form, or memo approving the SIP report.

• The SIP actual completion date is the date the SIP report is approved; and

• WasteLAN contains the actual SIP completion date (Actual Complete), and a "decision" on whether further activities
  are necessary is recorded in the Qualifier field for the SubAction; and

• The decision is documented by completing the Site Decision Form 9100-3 in WasteLAN, or an equivalent document.
  The decision document must be printed, signed by the appropriate Regional official, and placed in the file.

Valid decisions at the conclusion of a SIP include:

(H) High - Higher priority for further assessment Note: The next stage of assessment could be an expanded site
inspection (Action Name = Expanded Site Inspection), an integrated ESI/RI (Action Name = ESI/RI), or preparation of
an HRS package (Action Name = Hazard Ranking System Score Determi); or

(L) Low - Lower priority for further assessment; or

(N) - No further remedial action planned;  or

(D) - Deferred to RCRA (Subtitle C) or the NRC; or

(A) - Site is being addressed as part of an NPL site. A site having an event qualifier of 'A' should have an NPL Status
Indicator (Site NPL Status) of 'A' and a valid value in the Site Parent ID field ; or

(F) - Referred to the removal program with further remedial assessment needed; or

(W) - Referred to the removal program with no further remedial assessment needed; or               ,

(Code Pending) - Site is being remediated via a State or Tribal program.

SIPs are typically performed as stand-alone activities; that is, they are not integrated with removal evaluations .

Changes in Definition FY  98-FY 99/00:
Added new, action qualifier value.

Special Planning/Reporting Requirements:
Actual start and completion dates are required for SIPs.  SIP  starts (Actual Start)  and completions (Actual Complete)
are reported site-specifically  in WasteLAN.  Only the first SIP start at a site will be given credit for SCAP funding
purposes. No funding is provided by HQ for SIPs at Federal  facilities.  Decisions reached at the conclusion of SIP
July 1, 1998                              '         A-16

-------
                                                                           OSWER Directive 9200.3-14-1E

 Changes in Definition FY 98 - FY 99/00:
 Combined PA/SI Assessments starts is a program measure.  Combined PA/SI Assessment completions is a program
 measure.  Formerly, this activity was documented within the PA and SI measures.  Added new action qualifier value.

 Special Planning/Reporting Requirements:
 For Combined PA/SI Assessments, the PA start and completion dates (Actual Start and Actual Complete) entered into
 WasteLAN must be the same as the SI start and completion dates (Actual Start and Actual Complete).  Do not enter the
 PA completion date until there is a combined PA/SI report, even though a determination has already been made that an
 SI is needed. PAs performed as part of a Combined PA/SI Assessment should receive a qualifier of (H) High which
 represents a high priority for further assessment.

 Combined PA/SI Assessment starts at non-Federal Facility sites is a program measure.  Combined PA/SI Assessment
 completions at non-Federal Facility sites is a program measure.


 SITE INSPECTION PRIORITIZATIONS (SIPS) AT NON-FEDERAL FACILITY SITES

 Definition:
 SIPS (SubAction Name = Site Inspection Prioritization) require the gathering of additional information  to update site
 inspections performed under the original Hazard Ranking System (HRS).  SIPS are performed only at sites where the
 last SI was completed prior to August 1, 1992, and further evaluation is required to determine what steps, if any, need
 to occur next at the site.  For most Regions, the original SIP backlogs have been completed  although a few still remain.
 SIPs are currently recorded in WasteLAN as SubActions (SubAction Name = Site Inspection Prioritization) to the last
 completed site inspection event (Action Name = Site Inspection). A proposal has been made to change SIPs to an Action
 or allow a start date for the SIP subAction.  Once a decision is made, WasteLAN will be revised accordingly.

 In general, a finite  number of sites were originally identified as needing SIPs and EPA has completed SIPS at nearly all
 of these sites.  As a result, EPA expects few SIPs to be required in the current fiscal year since current PA and SI
 activities should be following the revised HRS methodology. Nonetheless, EPA anticipates a limited number of older
 sites addressed under the original HRS, which were not part of the original  universe of sites needing SIPs, may now
 require SIPs based on new information received by EPA.  This would apply to sites that were evaluated and assigned
 a NFRAP or Deferred decision under the original HRS prior to August 1, 1992, for which new information has been
 provided to EPA indicating further Superfund evaluation of the site is warranted.

 HQ recognizes FAS techniques are a cost and time effective alternative  to  the current CLP only process. Regions are
 encouraged to move implementation of FAS techniques from the pilot stage to standard operating procedures and employ
 these techniques wherever practical during conduct of SIP activities.

Backlogs
The Site Inspection Prioritization backlog consists of sites where the last SI was completed prior to August 1, 1992, the
 SI decision is High (H)  or Low (L), the SI was the last completed assessment action recorded in WasteLAN, and the
Region has indicated a SIP is warranted. WasteLAN has been modified to clearly reflect which sites still need SIPS
completed.  This  information is displayed on  the Site  Program Priorities  screen  in  WasteLAN.   On the Site
Description/Operable Units screen, if "Site Inspection Prioritization Needed" is in the Special Initiative box, this
 indicates the site still needs a SIP completed.  Regions are responsible for deleting "Site Inspection  Prioritization
Needed" value once a SIP is completed, or if a decision not to perform a SIP at the site is made.  HQ will use this table
 to calculate the size of the remaining SIP backlog.
                                                 A-15                                       July 1, 1998

-------
                                                                           OSWER Directive 9200.3-14-1E

 Valid decisions to be recorded upon completion of a SI include:

 (H) High - Higher priority for further assessment Note:  The next stage of assessment could be an ESI (Action Name
 = Expanded Site Inspection), an integrated ESI/RI (Action Name = ESI/RI), or preparation of an HRS package (Action
 Name = Hazard Ranking System Score Determi); or

 (L) Low - Lower priority for further assessment; or

 (N) - No further remedial action planned; or

 (D) - Deferred to RCRA (Subtitle C) or NRC; or

 (A) - Site is being addressed as part of an NPL site. A site having an event qualifier of 'A' should have an NPL Status
 Indicator (Site NPL Status) of 'A' and a valid value in the Site Parent ID field ; or

 (F) - Referred to the removal program with further remedial assessment needed; or

 (W) - Referred to the removal program with no further remedial assessment needed; or

 (Code Pending) - Site is being remediated via a State or Tribal program.

 Changes in Definition FY 98 - FY  99/00:
 Added new action qualifier value.

 Special Planning/Reporting Requirements:
 Planning dates are not required for Sis. Actual start and completion dates are required for Sis.  For budget and resource
 allocations, separate projections must be made for EPA contractor, State, Tribal, and EPA in-house SI starts. SI starts
 (Actual Start) and completions (Actual Complete) are reported site-specifically in WasteLAN. Only the first SI start
 at a site will be given credit for SCAP funding purposes.  Site Inspection starts at non-Federal Facility sites is a program
 measure.  Site Inspection completions at non-Federal Facility sites is a program measure.


 COMBINED PA/SI ASSESSMENTS AT NON-FEDERAL FACILITY SITES

 Definition:
 With the implementation of SACM, Regions are encouraged to combine PA and SI activities where warranted by site
 conditions to reduce repetitive tasks and, ultimately, costs. The combining of PA and SI activities is known as a
 "Combined PA/SI  Assessment"  (Action Name = Combined Assessment).  A combined PA/SI assessment  can  be
 contained in one physical report, as long as the report contains all of the elements that would have been addressed under
 separate PA and SI reports. The report should state specifically that it covers both the PA and SI. The decision to
 conduct an SI as part of a combined assessment is made prior to initiation of the PA and is documented in the initial task
 assignment provided to the contractor, by correspondence between EPA and the State, or by a form or memo to the file
 As is the case with its individual components, a combined PA/SI is performed to determine what steps, if any, need to
 occur next at a site.

 HQ recognizes FAS techniques are a cost and time effective alternative to the current CLP only process. Regions are
 encouraged to move implementation of FAS techniques from the pilot stage to standard operating procedures and employ
 these techniques wherever practical during conduct of Combined PA/SI activities.

 SACM also encourages Regions to further reduce repetitive tasks and costs by combining site assessment and removal
 evaluation activities where  warranted by site conditions.  Combined PA/SI assessments may also be  applied in an
 integrated  removal/remedial evaluation  approach.  Integrated Assessment and Combined PA/SI (Action  Name  =
Integrated Assessment and Combined Assessment) activities are tracked as an internal planning measure. Please note


                                                A-!3                                      July 1, 1998

-------
OSWER Directive 9200.3-14-1E

when Combined PA/SIs are performed as part of an integrated removal/remedial evaluation, information should be
entered for the Removal Assessment, PA, and SI.  Special reporting requirements also apply to PA actions when they
are performed as part of a combined assessment, as noted below.

Backlogs
The Combined PA/SI Assessment backlog is incorporated into the PA backlog.

Definition of Accomplishment:
Combined PA/SI Starts - A Combined PA/SI starts when the Region begins collecting data and performing other tasks
related to development of the combined PA/SI report; or when the Region signs a letter, form, or memo to the EPA
contractor or State/Tribal government (where applicable), requesting performance of a combined PA/SI assessment at
a specific site or group of sites; or when EPA receives written confirmation from State/Tribal government that the
State/Tribal government will conduct the Combined PA/SI Assessment; and WasteLAN contains identical actual start
dates (Actual Start) for both the PA and SI action, and identical leads for both PA and SI actions of: "Fund-Financed
(F)"; "EPA-In House (EP)"; "State (S)"; or "Tribal (TR)". Start dates are required.

Combined PA/SI Completions - A Combined PA/SI Assessment is completed when:

•  A Combined PA/SI  Report has been developed by EPA; or received by the Region  from the Federal contractor or
   State/Tribal government; and the appropriate Regional official signs a letter, form, or memo approving the Combined
   PA/SI report.

•  The date the Combined PA/SI report is approved is entered into WasteLAN as the actual completion date of the PA
   and actual completion date of the SI; and

•  WasteLAN contains identical actual PA and SI completion dates (Actual Complete), identical and valid PA and SI
   leads (Lead), a "High priority (H)" decision in the PA Action Qualifier field, and a "decision" on whether further
   activities are necessary in the SI Action Qualifier field; and

•  The decision is documented by completing the Site Decision Form 9100-3 in WasteLAN, or an equivalent document.
   The decision document must be printed, signed by the appropriate Regional official, and placed in the file.

Valid decisions to be recorded in WasteLAN with the SI action upon completion of the Combined Assessment include:

(H) High - Higher priority for further assessment  Note: The next stage of assessment could be an ESI (Action Name
=: Expanded Site Inspection), an  integrated ESI/RI (Action Name = ESI/RI), or preparation of an HRS package (Action
Name = Hazard Ranking System Score Determi); or

(L) Low - Lower priority for further assessment; or

(N) - No further remedial action planned; or

(D) - Deferred to RCRA (Subtitle C) or the NRC; or

(A) - Site is being addressed as part of an NPL site. A site having an event qualifier of 'A' should have an NPL Status
Indicator (Site NPL Status) of 'A' and a valid value in the Site Parent ID field; or

(F) - Referred to the removal program  with further remedial  assessment needed; or

(W) - Referred to the removal program with no further remedial assessment needed; or

(Code Pending) - Site  is being remediated via a State or Tribal program.
 July 1, 1998                                       A-14

-------
                                                                           OSWER Directive 9200.3-14-1E

 Special Planning/Reporting Requirements:
 Planned start and completion dates are not required for ESI/RIs.  Actual start and completion dates are required for
 ESI/RIs. ESI events (Action Name = Expanded Site Inspection) should not be recorded separately in WasteLAN if they
 are conducted as part of an ESI/RI.  ESI/RI starts at non-Federal Facility sites is a program measure. ESI/RI completions
 at non-Federal Facility sites is a program measure.               .


 STATE DEFERRAL OF NON-FEDERAL FACILITY SITES

 Definition:
 State Deferral (Action Name = State Deferral) is an administrative mechanism enabling States and Tribes, under their
 own laws, to respond at WasteLAN sites that EPA would otherwise not soon address. Under the State Deferral program,
 EPA anticipates that responses may be quick and efficient, yet still be protective of the environment and of communities'
 rights to participate in the decision-making process. Refer to the "Guidance on Deferral of NPL Listing Determinations
 While State Oversee Response Actions" (OSWER Directive 9375.6-11, May 1995) for additional information on this
 program.

 Backlogs
 The State Deferral backlog consists of sites where the last site assessment activity recorded at a site is a state deferral
 action with an actual start date but no actual completion date recorded in WasteLAN.

 Definition of Accomplishment:
 State Deferral Starts - The State Deferral (Action Name = State Deferral) process start is defined as the date when the
 Regional Superfund program director and the State program director sign a document deferring the site to the State under
 the terms established in the deferral guidance. A State Deferral action must be recorded in WasteLAN with an action
 lead (Lead) of "State Deferral (SD)". State deferrals are applicable only to non-Federal facility sites that are not on the
 NPL.

 State Deferral Completions - The State Deferral  (Action Name = State Deferral) completion date is defined as either:
 1) the signature date of a formal Regional document confirming that the deferral has been completed successfully, or
 terminating the deferral agreement; or 2) 90 days after the date EPA receives State certification that the deferral has been
 completed.  The outcome (Qualifier) of the State deferral must be entered with the completion date.

 Valid outcomes (Qualifiers) to be recorded upon completion of the State Deferral include:

 •  (Code Pending) Region has formally confirmed successful completion of. State deferral; or

 •  (Code Pending) Region has terminated the  status of the deferral.

 Changes in Definition FY 98 - FY 99/00:
This is a new measure in FY 99/00.

Special Planning/Reporting Requirements:
Planned start and completion dates are not required for State Deferral actions. Actual start and completion dates are
required. Sites as which a deferral has been successfully completed are eligible for archiving (removal) from WasteLAN.
State Deferral starts and completions is a program measure.
                                                 A-21                                       July 1,1998

-------
OSWER Directive 9200.3-14-IE

HAZARD RANKING SYSTEM PACKAGE (HRS)

Definition:
The HRS Package (Action Name = Hazard Ranking System Score Determi) documents a numeric score of the relative
severity of a hazardous substance release or potential release based on: (1) the relative potential of substances to cause
hazardous situations; (2) the likelihood and rate at which the substances may affect human and environmental receptors;
and (3) the severity and magnitude of potential effects. The HRS Package also includes references and documentation
in support of the score.  The score is computed using the revised Hazard  Ranking System (HRS).  Regions are
responsible for preparing HRS packages for both Federal and non-Federal facility sites. Regions submit a draft version
of the HRS package to HQ for quality assurance review. Regions and HQ work together to address issues and agree on
a final version of the HRS package.  Based on results of the completed HRS package and other factors, Regions
determine what the next steps, if any, are appropriate for a site (e.g., NPL listing, NFRAP, etc.)
                                                                      j
Definition of Accomplishment:
HRS Package Starts - An HRS Package (Action Name = Hazard Ranking System Score Determi) start is defined as the
date when EPA  signs a memo,  form, or letter requesting development of an HRS Package for a specific site and
WasteLAN contains the actual HRS Package start date (Actual Start) and an action lead (Lead) of: "Fund-Financed (F)";
"EPA-In House (EP)"; "State (S)"; or 'Tribal (TR)".  HRS Package start dates are  required for both Federal and non-
Federal facility sites, and are used to identify  the status of sites in the site assessment pipeline and to measure activity
durations.

HRS Package Completions - An HRS Package (Action Name = Hazard Ranking System Score Determi) is complete
when:

•  An HRS Package has completed HQ quality assurance review and HQ and the Region agree to a final version; and

•  The following has been recorded in  WasteLAN: the approval date for the final version of the HRS Package date as
   the actual HRS Package completion date (Actual Complete); a valid lead (Lead); and a "decision" on whether further
   activities are necessary in the Qualifier field. Since HRS Packages  are pre-decisional, entry of HRS Package
   completion dates in WasteLAN may be delayed until after the HRS Package is proposed to the NPL, if applicable;
   and

•  The decision is documented by completing the Site Decision Form 9100-3 in WasteLAN, or an equivalent document.
   The decision document must be printed, signed by the appropriate Regional official, and placed in the file.

Note: Submission of HRS Packages to HQ for technical assistance does not represent an HRS Package completion.

Valid decisions to be recorded upon completion of the HRS Package include:

(O) - Site is being considered for proposal to the NPL; or

(N) - No further remedial action planned.

Changes in Definition FY  98 - FY  99/00:
Regions will be entering the HRS action qualifier into WasteLAN.

Special Planning/Reporting Requirements:
Planned Start and completion dates are  not required for HRS Packages. Actual start and completion dates are required
 for HRS Packages. HRS Package starts at both Federal and non-Federal Facilities is a program measure. HRS Package
completions at both Federal and non-Federal Facilities is a program  measure.
 July 1, 1998                                       A-22

-------
                                                                            OSWER Directive 9200.3-14-1E

INTEGRATED REMOVAL/REMEDIAL EVALUATION

Definition:
Integrated Removal/Remedial Evaluations (Action Name = Integrated Assessment), are SACM-originated actions
integrating both site assessment (e.g., Preliminary Assessment, Site Inspection)  and removal assessment activities to
reduce the overall time and money spent characterizing site conditions.   The scope of the Integrated Removal/Remedial
Evaluation will depend  on which  activities are being jointly conducted.   Three  specific types of Integrated
Removal/Remedial Evaluations will be tracked:

•  Integrated Removal Assessments and Preliminary Assessments (PA);
•  Integrated Removal Assessments and Site Inspections (SI); and
•  Integrated Removal Assessments and Combined PA/SI Assessments.

Regions are encouraged to make use of integrated assessment approaches wherever appropriate and can initiate ESI and
ESI/RI activities. SPIM discussion is limited to three types of integrated assessments listed above for brevity purposes
only. Requirements of a stand-alone PA, SI, and removal assessment must still be  met, even though they are conducted
in an integrated fashion. Refer to appropriate sections of the SPIM and Superfund assessment guidance documents for
further requirements of stand-alone assessment activities.  The definitions and special planning/reporting requirements
for all three types of Integrated Removal/Remedial Evaluations listed above follow the same general concept.  Generic
definitions and requirements are provided below.

Although the Integrated Assessment action is intended  to track integrated removal  and site assessment actions, it should
not  take the  place of coding  individual  site assessment  and removal actions.  In other words, if an Integrated
Removal/Remedial Evaluation is conducted, it should be coded in WasteLAN along with the actions represented by that
Integrated Removal/Remedial Evaluation, such as a Removal Assessment and a Site Inspection. The individual actions
represented by Integrated Removal/Remedial Evaluation must still be recorded separately in WasteLAN.

HQ recognizes FAS techniques are a cost and time effective alternative to the current CLP only process. Regions are
encouraged to move implementation of FAS techniques from the pilot stage to standard operating procedures and employ
these techniques wherever practical during conduct of Integrated Removal/Remedial Evaluation activities.

Backlogs
Sites on an Integrated Removal/Remedial Evaluation backlog are incorporated into the PA and SI backlogs.

Definition of Accomplishment:
Starts - An Integrated Removal/Remedial Evaluation (Action Name ~ Integrated Assessment) start date is defined as the
date when EPA approves the site-specific Integrated Removal/Remedial Evaluation  work plan (e.g., Removal Assessment
and SI work plan) and  WasteLAN contains:

•  The actual Integrated Assessment start date (Actual Start) and an action lead (Lead) of: "Fund-Financed (F)"; "EPA-
  In House (EP)";  "State (S)"; or "Tribal  (TR)"; and

•  The actual start date and lead for the  related assessment actions (Preliminary Assessment, Site Inspection, Removal
  Assessment). The start date and lead for these actions and for the Integrated Assessment action must be the same.

Completions - An Integrated Removal/Remedial Evaluation (Action Name = Integrated Assessment) is complete when:

•  The Integrated Removal/Remedial Evaluation report has been reviewed and accepted by the Region and an appropriate
  Regional official  signs a letter, form, or memo approving the  report. The report must contain  all of the information
  required for the related site assessment  and must document the completion of a Removal Assessment to determine
  whether a removal action is necessary.  A note to the site file must also be prepared indicating that the Integrated
  Removal/Remedial Evaluation report meets all the requirements for the related assessment activities; and
                                                  A-23                                       My 1, 1998

-------
OSWER Directive 9200.3-14-1E

• The Integrated Removal/Remedial Evaluation report approval date is entered into WasteLAN as the actual Integrated
  Assessment completion date (Actual Complete) with a valid lead (Lead); and

• An actual complete date and lead for the related assessment  actions (Preliminary Assessment, Site Inspection,
  Removal Assessment) equal to that recorded for the Integrated Assessment action is entered into WasteLAN; and
                                                                      i
• The decision is documented by completing the Site Decision Form 9100-3 in WasteLAN, or an equivalent document.
  The decision document must be printed, signed by the appropriate Regional official, and placed in the file.

A "decision" on whether further activities are necessary is entered into WasteLAN in the Action Qualifier field for the
related site assessment event (Preliminary Assessment, Site Inspection).  Note that action qualifiers are allowed for
Integrated Assessment actions but are not required. If entered, an Integrated Assessment action qualifier should be the
same as that entered for the related site assessment action.

 Valid Integrated Assessment action qualifiers include:

(H) High - Higher priority for further assessment. Note: The next stage of assessment could be an SI (Action Name
= Site Inspection), expanded site inspection (Action Name =Expanded Site Inspection), an integrated ESI/RI (Action
Name =ESI/RI), or preparation of an HRS package (Action Name =Hazard Ranking System Score Determi); or
                                                                      1
(L) Low - Lower priority for further assessment; or

(N) - No further remedial action planned; or

(D) - Deferred to RCRA (Subtitle C) or the NRC; or
                                                                      I
(A) - Site is being addressed as part of an NPL site. A site having an event qualifier of 'A' should have an NPL Status
Indicator (Site NPL Status) of 'A' and a valid value in the  Site Parent ID field; or

(F) - Referred to the removal program with further remedial assessment needed; or

(W) - Referred to the removal program with no further remedial assessment needed; or

(G)  - Recommended for  HRS scoring.  This qualifier should be used only when the site assessment portion of an
Integrated Assessment consists of an ESI or ESI/RI; or

 (Code Pending) - Site is being remediated via a State or Tribal program. NOTE: This qualifier is not valid for Integrated
 Removal and Preliminary Assessments.

 Changes in Definition FY  98 - FY  99/00:
 Added language on three different types of Integrated Removal/Remedial Evaluations. Added new action qualifier value.

 Special Planning/Reporting Requirements:
 Planning dates are not required for Integrated Assessments.  Actual start and completion dates are required for Integrated
 Assessments. Integrated Assessment action qualifiers  are allowed but  are not  required.  If entered, an Integrated
 Assessment action qualifier should be the same as that entered for the related site assessment event. Integrated Removal
 Assessment and PA, Removal Assessment and SI, and Removal Assessment and Combined PA/SI starts at non-Federal
 facilities are program measures. Integrated Removal Assessment and PA, Removal Assessment and SI, and Removal
 Assessment and Combined PA/SI completions are program measures.
 July 1,1998                                      A-24

-------
                                                                          OSWER Directive 9200.3-14-IE

NPL LISTING

Definition:
The NPL is a list of national priorities among the known or threatened releases of hazardous substances, pollutants, or
contaminants throughout the United States and trust territories.  There are three mechanisms for placing sites on the NPL
for possible remedial action:

•  A site may be included on the NPL if it scores sufficiently high on the Hazard Ranking System (HRS).  The HRS
   serves as a screening device to evaluate the relative threat that uncontrolled hazardous substances pose to human health
   or the environment. As a matter of Agency policy, those sites that score 28.50 or greater on the HRS are eligible for
   the NPL.

•  Each State may designate a single site as its top priority to be listed on the NPL, regardless of the HRS score.

•  Certain sites may be listed regardless of their HRS score, if all of the following conditions are met:

           The Agency for Toxic Substances and Disease Registry (ATSDR) of the U.S. Public Health Service has
           issued a health advisory that recommends dissociation of individuals from the release; and

           EPA determines that the release poses a significant threat to public health; and

           EPA anticipates that it will be more cost-effective to use its remedial authority than to use its removal
           authority to respond to the release.

Definition of Accomplishment:
Proposed NPL Listing - The process of proposing a site for placement on the NPL is complete (Actual Complete date)
when a Proposed Rule proposing the site to the NPL [Action Name = Proposal to NPL] is published in the Federal
Register.

Removal of Proposed NPL Listing - The process of removing a site from the list of proposed NPL sites starts (Actual
Start date) when a proposal to remove the site is.published in the Federal Register and is complete (Actual Complete
date) when final notice of the removal is published in the Federal Register [Action Name = Removed from the Proposed
NPL].

Final NPL Listing - The listing process for a site is complete (Actual Complete date) when a Final Rule adding the site
to the NPL [Action Name = Final Listing on NPL] is published in the Federal Register.

Changes in Definition FY 98 - FY 99/00:
NPL Listing is a new measure for FY 99/00.

Special Planning/Reporting Requirements:
HQ staff are responsible for entering and/or updating, if applicable, the following data in WasteLAN:

•  The NPL Status (P = Proposed for NPL; R = Removed from list of proposed NPL sites; F = Currently on the NPL;
   (Code Pending) Withdrawn from NPL);

•  The NPL listing Actions (Proposal to NPL, Removed from Proposed NPL, and Final Listing on NPL) and their actual
   start and/or completion date(s);

•  The Federal Register citations; and
                                                 A-25                                       July 1, 1998

-------
OSWER Directive 9200.3-14-IE

• Site related information including:

           Site name
           EPA Site ID
           Street Address
           City
           County
           State
           Zip Code
           Region
           Congressional district
           Federal facility status
           Site setting
           Latitude and Longitude
           Site Characteristics
           HRS Score
           Chemical information
                                           _
                                                                    i
NOTE: Currently, WasteLAN does not support HQ entry of these data. Further information on Deletion and Partial
Deletion from the NPL can be found in Appendix B of this Manual. NPL Listing is a GPRA Target/Perfornance Goal.


REGIONAL DECISIONS

Definition:
This measure will track decisions made by the Region [including the Regional Decision Team (RDT)] on whether to
perform site assessment, enforcement, and early and long-term actions. The RDT is empowered by the Region to make
those decisions that are delegated to its level.  This body serves as a tool to ensure early and effective communication
and should provide input for the traditional line decision-making authorities.  Though the structure and responsibilities
of the RDT vary from Region to Region, the RDT generally should provide policy and strategic direction to designated
site managers.

Definition of Accomplishment:
The Regional decisions are reported in WasteLAN as a SubAction (SubAction Name = RDT Decision) to the point in
the assessment or response pipeline where the decision was made (i.e., PA, SI, ESI, ESI/RI, or Integrated Assessment)
to perform additional site assessment activities, early or long-term actions, or take enforcement action [e.g., Potentially
Responsible Party (PRP) negotiations].  These decisions are documented in  a letter, form, or memo to the file.

The dates of the Region's decisions (SubAction Name = RDT Decision) are entered as the actual SubAction completion
dates (Actual  Complete). Each decision must be documented in a memo to  the file and reported separately. HQ will
identify the activities the Region documented they would perform in the Regional decision based on the SubAction
(SubAction Name = RDT Decision) completion date (Actual Complete) and the start dates (Actual Start) of subsequent
actions.                                                             \

Changes in Definition FY  98-FY 99/00:
None

Special Planning/Reporting Requirements:
This is a program measure. This definition is-for regional tracking purposes only.
July 1, 1998                                      A-26

-------
                                                                         OSWER Directive 9200.3-14-IE

SUPPORT AGENCY ASSISTANCE

Definition:
Support agency assistance are the activities performed by another entity in support of EPA. The support agency furnishes
necessary data to EPA, reviews response data and documents, and provides other assistance to EPA.

EPA may provide States, political subdivisions, and Indian Tribes with funding to carry out a variety of management
responsibilities via a support agency Cooperative Agreement  to ensure the meaningful and substantial involvement in
response activities.  Unless otherwise specified in the Cooperative Agreement, all support agency costs, with the
exception of RA support agency costs, may be planned under a single Superfund account number designated specifically
for support agency activities. RA or support agency activities must: be planned site- specifically and require cost share
provisions.

Definition of Accomplishment:
The start of support agency assistance (Action Name - Management Assistance) is the signature of the Cooperative
Agreement  by the Regional Administrator or designee. The completion of support agency assistance is the completion
of all remedial activities at the site.


Changes  in Definition FY 98 - FY 99/00:
Deleted reference to early action (remedial authority).

Special Planning/Reporting Requirements:
Funds for support agency assistance are contained in the site characterization, enforcement or Federal facility AOA.
Planned and actual start and completion dates are not required in WasteLAN.  Funds may be planned or obligated site
 or non-site specifically; however, they must be putlayed site-specifically. This is a program measure.


TECHNICAL ASSISTANCE

Definition:
Technical assistance is support provided by a third party to EPA to conduct response activities.  Third parties that may
provide assistance include the U.S. Army Corps of Engineers (USAGE), the U.S. Fish and Wildlife Service, other Federal
agencies and federal contractors.

Definition of Accomplishment:
The start of technical assistance (Action Name = Technical Assistance)is the obligation of funds for technical assistance.
The completion is defined as the completion of the response activities for the stage at which technical assistance was
requested.                                   •

Changes  in Definition FY 98 - FY 99/00:
None

Special Planning/Reporting Requirements:
Funds  for Technical Assistance are contained in the site characterization or enforcement AOA  or Federal facility.
Planned and actual start and completion dates are not required in WasteLAN. Funds  may be planned or obligated site-
or non-site specifically; however, they must be outlayed site-specifically. This is a program measure.
                                                 A-27                                      July 1, 1998

-------
OSWER Directive 9200.3-14-1E
                                   EXHIBIT A.2 (1 OF 8)
    SITE SCREENING AND ASSESSMENT/REGIONAL DECISION PLANNING REQUIREMENTS
Planning
Requirements
GPRA Target/Annual
Performance Goal
GPRA or Program
Measure?
Planned Site-
Specifically?
Planned/Reported on
Operable Unit or
Whole Site Basis?
Reported Site-
Specifically or in
Non-Site Specific
Portion of WasteLAN
orCERCLIS?
AOA Category, if
Fund-Financed?
AOA Category for
Oversight?
Basis for AOA?
Brownflelds
Assessment
-
Program Measure
No
Whole Site
Non-
Site-specific
Site
Characterization
N/A
Non-Site Specific
Plans
Pre-CERCLK
Screening
Assessments
-
GPRA Measure
No
Whole Site
Non-Site Specific
Site Characterization
N/A
Non-Site Specific
Plans
Site Discovery
-
GPRA Measure
No
Whole Site
Site-Specific
N/A
N/A
N/A
'Sites Archived
-
GPRA Measure
No
Whole Site
Site-Specific
N/A
N/A
N/A
  NOTE:  Accomplishments are pulled from WasteLAN on a semi-annual basis.
July 1,1998
A-28

-------
                                                             OSWER Directive 9200.3-14-1E
                                 EXHIBIT A.2 (2 OF 8)
    SITE SCREENING AND ASSESSMENT/REGIONAL DECISION PLANNING REQUIREMENTS
Planning Requirements
GPRA Target/Annual
Performance Goal
GPRA or Program Measure?
Planned Site-Specifically?
Planned/Reported on
Operable Unit or Whole Site
Basis?
Reported Site-Specifically or
in Non-Site Specific portion
ofWasteLAN?
AOA Category, if Fund-
Financed?
AOA Category for
Oversight?
Basis for AOA?
,PA Starts at ISfpn-
Federal Facilities
-
Program Measure
No
Whole Site
Site-Specific
Site
Characterization
N/A
Non-Site Specific
Plans
FF PA Review
- Starts
-
Program Measure
No
Whole Site
Site-Specific
Site
Characterization
N/A
Non-Site Specific
Plans
PA Completions
at Non-Federal
Facilities '
-
Program Measure
No
Whole Site
Site-Specific
N/A
N/A
N/A
FF PA Review
Completions
-
Program Measure
No
Whole Site
Site-
Specific
N/A
N/A
N/A
                                  EXHIBIT A.2 (3 OF 8)
    SITE SCREENING AND ASSESSMENT/REGIONAL DECISION PLANNING REQUIREMENTS
Planning Requirements
•y
GPRA Target/Annual
Performance Goal
GPRA or Program Measure
Planned Site-Specifically?
Planned/Reported on
Operable Unit or Whole
Site Basis?
Reported Site-Specifically
or in Non-Site Specific
Portion ofWasteLAN?
AOA Category, if Fund-
Financed?
AOA Category for
Oversight?
Basis for AOA?
SI Starts at Non
Federal Facilities
-
Program Measure
No
Whole Site
Site-Specific
Site Characterization
N/A
Non-Site Specific
Plans
SI Completions at
Non Federal
' N Facilities
-
Program Measure
No
Whole Site
Site-Specific
N/A
N/A
N/A
Combined PA/SI
Assessment Starts
at Non Federal
Facilities
-
Program Measure
No
Whole Site
Site-Specific
Site
Characterization
N/A
Non-Site Specific
Plans
Combined PA/SI
Assessment Starts
at Non Federal
Facilities
-
Program Measure
No
Whole Site
Site-Specific
Site
Characterization
N/A
Non-Site Specific
Plans
NOTE:    Accomplishments are pulled from WasteLAN on a semi-annual basis.
                                         A-29
July 1, 1998

-------
 OSWER Directive 9200.3-14-1E
                                    EXHIBIT A-2 (4 OF 8)
     SITE SCREENING AND ASSESSMENT/REGIONAL DECISION PLANNING REQUIREMENTS
Planning Requirements
GPRA Target/Annual
Performance Goal
GPRA or Program
Measure?
Planned Site-Specifically?
Planned/Reported on
Operable Unit or Whole
Site Basis?
Reported Site-Specifically
or in Non-Site Specific
Portion of WasteLAN?
AOA Category, if Fund-
Financed?
AOA Category for
Oversight?
Basis for AOA?
SIP Starts at
Non Federal
Facilities
-
Program
Measure
No
Whole Site
Site-Specific
Site
Characterization
N/A
Non-site
Specific Plans
SIP Completions
at Non Federal
Facilities
-
Program Measure
No
Whole Site
Site-Specific
N/A
N/A
N/A
ESI Starts at Non
Federal Facilities
-
Program Measure
Yes
Whole Site
Site-Specific
Site
Characterization
N/A
Site-Specific Plans
ESI Completions at
Non Federal
Facilities
-
Program Measure
No
Whole Site
Site-Specific
N/A
N/A
N/A
   NOTE:  Accomplishments are pulled from WasteLAN on a semi-annual basis.
July 1, 1998
A-30

-------
                                                             OSWER Directive 9200.3-14-IE
                                 EXHIBIT A.2 (5 OF 8)
  SITE SCREENING AND ASSESSMENT/REGIONAL DECISION PLANNING REQUIREMENTS
Planning Requirements
GPRA Target/Annual
Performance Goal
GPRA or Program
Measure?
Planned Site-Specifically?
Planned/Reported on
Operable Unit or Whole
Site Basis?
Reported Site-Specifically
or in Non-Site Specific
Portion of WasteLAN?
AOA Category, if Fund-
Financed?
AOA Category for
Oversight?
Basis for AOA?
Federal"
' Facility
SI/ESI
Review Starts
-
Program
Measure
No
Whole Site
Site-Specific
N/A
N/A
N/A
,- Federal
Facility SI/ESI
-•^Review
Completions
-
Program
Measure
No
Whole Site
Site-Specific
N/A
N/A
N/A
,/, Integrated
ESI/RI Starts
« ' /
-
Program Measure
Yes
Whole Site
Site-Specific
Site
Characterization
N/A
Site-Specific
Plans
Integrated*
ESI/RI
Completions
-
Program
Measure
No
Whole Site
Site-Specific
N/A
N/A
N/A
State
Deferral
/
-
Program
Measure
Yes
Whole Site
Site-
Specific
N/A
N/A
N/A
NOTE:     Accomplishments are pulled from WasteLAN on a semi-annual basis.
                                        A-31
July 1, 1998

-------
 OSWER Directive 9200.3-14-1E
                                    EXHIBIT A.2 (6 OF 8)
     SITE SCREENING AND ASSESSMENT/REGIONAL DECISION PLANNING REQUIREMENTS
Planning Requirements
GPRA Target/Annual
Performance Goal
GPRA or Program Measure?
Planned Site-Specifically?
Planned/Reported on Operable
Unit or Whole Site Basis?
Reported Site-Specifically or in
Non-Site Specific Portion of
WasteLAN?
AOA Category, if Fund-
Financed?
AOA Category for Oversight?
Basis for AOA?
HRS Package
Starts
-
Program
Measure
Yes
Whole Site
Site-Specific
Site
Characterization
N/A
Site Specific
Plans
HRS Package
Completions

Program
Measure
No
Whole Site
Site-Specific
N/A
N/A
N/A
Integrated
Removal
Assessments and PA
Starts at non-
Federal Facilities -
-
Program Measure
Yes
Whole Site
Site-Specific
Removal and Site
Characterization
N/A
Non-Site Specific
Plans
Integrated
Removal
Assessments and
PA Completions at
non-Federal
Facilities

Program Measure
No
Whole Site
Site-Specific
N/A
N/A
N/A
 NOTE:    Accomplishments are pulled from WasteLAN on a semi-annual basis.
July 1, 1998
A-32

-------
                                                            OSWER Directive 9200.3-14-IE
                               EXHIBIT A.2 (7 OF 8)
SITE SCREENING AND ASSESSMENT/REGIONAL DECISION PLANNING REQUIREMENTS
Planning Requirements r ~
,'- /f
a -f " /•
•j
GPRATarget/Annual
Performance Goal
GPRA or Program Measure?
Planned Site-Specifically?
Planned/Reported on Operable
Unit or Whole Site Basis?
Reported Site-Specifically or in
Non-Site Specific Portion of
WasteLAN?
AOA Category, if Fund-
Financed?
AOA Category for Oversight?
Basis for AOA?
Integrated
y Removal, >*•'
Assessment & SI
Starts at Non-
Federal Facility*
Sites
'<', , :> '*•
-
Program Measure
Yes
Whole-Site
Site-Specific
Removal and Site
Characterization
N/A .
Non-Site Specific
Plans
' Integrated
R.emoval ^
Assessment & SI
Completions at
/ Non-Federal „. >
Facility *Sitesj4
' t
-
Program Measure
Yes
Whole Site
Site-Specific
Removal and Site
Characterization
N/A
N/A
;^ Integrated,
Removal
Assessment and
Combined PA/SI
Starts at Non-
Federal Facility
, Sites
-
Program Measure
Yes
Whole Site
Site-Specific
Removal and Site
Characterization
N/A
Non-Site Specific
Plans
',' Integrated
Removal
Assessment and
Combined PA/S]
• Completions at
Non-Federal ,
Facility Sites
-
Program Measure
Yes
Whole Site
Site-Specific
Removal and Site
Characterization
N/A
N/A
NOTE: Accomplishments are pulled from WasteLAN on a semi-annual basis.
                                       A-33
July 1, 1998

-------
 OSWER Directive 9200.3-14-1E
                                  EXHIBIT A.2 (8 OF 8)
     SITE SCREENING AND ASSESSMENT/REGIONAL DECISION PLANNING REQUIREMENTS
Planning Requirements
GPRATarget/Annual
Performance Goal
GPRA or Program
Measure?
Planned Site-Specifically?
Planned/Reported on
Operable Unit or Whole
Site Basis?
Reported Site-Specifically
or in Non-Site Specific
Portion of WasteLAN?
AOA Category, if Fund-
Financed?
AOA Category for
Oversight?
Basis for AOA?
NPL Listing
GPRA Target
-
Yes
Whole Site
Site-Specific
Other Response/
Federal Facility
N/A
Site-Specific Plans
Regional
Decisions*
-
Program
Measure
No
Operable Unit
Site-Specific
N/A
N/A
N/A
Support Agency
Assistance -,
-
Program Measure
Not Required
Whole Site or Operable
Unit
Not Required
Site Characterization
Enforcement or
Federal Facility
Site- or Non-Site
Specific Plans
Technical
Assistance
-
Program
Measure
Not Required
Operable Unit
Not Required
Site
Characterization
Enforcement
Site- or Non-Site
Specific Plans
    NOTE:
Accomplishments are pulled from WasteLAN on a semi-annual basis.
July 1, 1998
                          A-34

-------
                                          OSWER Directive 9200.3-14-1E
Superfund/Oil Program Implementation Manual FY 99/00




             Appendix B: Response Actions
                                                       July 1, 1998

-------
 OSWER Directive 9200.3-14-IE
                                        This Page Intentionally
                                              Left Blank
July 1, 1998

-------
                                                                       OSWER Directive 9200.3-14-IE
                                           Appendix B
                                        Response Action
                                     Targets and Measures

                                        Table of Contents
RESPONSE ACTION FY 99/00 TARGETS AND MEASURES	 B-l

       Overview of FY 99/00 Response Action Targets/Measures 	 B-l
       Superfund Durations	 B-l
       Respond Action Definitions	 B-5

               Engineering Evaluation/Cost Analysis (EE/CA) ..	 B-5
               Support Agency Assistance	 B-5
               Technical Assistance	 B-6
               Remedial Investigation (RI) Starts	 B-6
               Feasibility Study (FS) Starts	 B-8
               Combined RI/FS Start	'	:	 B-9
               Treatability Studies 	 B-10
               Start of Public Comment Period (Proposed Plan to Public)  	 B-l 1
               RI/FS Duration  	 B-l 1
               Decision Document Signed	 B-12
               ROD Amendments and Explanation of Significant Differences  	 B-13
               Pre-Design Assistance	 B-13
               Remedial Design (RD) Start 	,.	 B-14
               RD Completion	 B-15
               Remedial Action (RA) Start	 B-16
               RA Contract Award	 B-17
               Start of Response Actions/Activities	 B-18
               Operational and Functional (O&F) 	 B-22
               Long-Term Response Action (LTRA)	 B-22
               Completion of a Response Action	,	 B-23
               NPL Site Construction Completions  	 B-26
               Operation and Maintenance (O&M)  	 B-32
               NPL Site Completions	 B-33
               Five-Year Reviews	 B-35
               Partial NPL Deletion	 B-36
               Final NPL Deletion 	 B-37
               Non-NPL Site Completion	 B-38
               Indicator A • Populations Protected	 B-38
               Indicator B • Progress Through Environmental Indicators
                       (Achieving Permanent Cleanup Goals)  	 B-40
               Indicator C • Technologies Used and Volumes Handled at NPL and Non-NPL Sites	 B-41
                                                                                        July 1, 1998

-------
OSWER Directive 9200.3-14-1E

                                     Appendix B
                                   Response Action
                                Targets and Measures

                                   List of Exhibits

EXHIBITS.1 RESPONSE ACTION ACTIVITIES	 B-3

EXHIBITB.2 LONG-TERM ACTION FLOW CHARTS	 B-42

EXHIBIT B.2 LONG-TERM ACTION FLOW CHARTS (continued)	.'	 B-43
                                                       i
EXHIBIT B.3 RESPONSE ACTION PLANNING REQUIREMENTS	 B-44
July 1, 1998

-------
                                                                          OSWER Directive 9200.3-14-IE
                                           APPENDIX B
                                      RESPONSE ACTIONS
                     FY 99/00 RESPONSE TARGETS AND MEASURES
OVERVIEW OF FY 99-00 RESPONSE ACTIONS TARGETS/MEASURES

    The Superfund Comprehensive Accomplishments Plan (SCAP) is used by the Assistant Administrator for the Office
of Solid Waste and Emergency Response (AA OSWER), Assistant Administrator for the Office of Enforcement and
Compliance Assurance (AA OECA), and senior Superfund managers to monitor progress each Region is making towards
achieving the Government Performance and Results Act (GPRA) targets and annual performance goals. In addition,
SCAP will continue to be used as an internal management tool to project and track activities that contribute to these
GPRA goals and support resource allocation. The program will set national goals based on historical performance and
performance expectations within a limited budget for the performance goals in GPRA and track accomplishments in the
activities contributing to those goals.  Regions should continue to plan and report accomplishments in WasteLAN as
they have traditionally.

To more clearly reflect the relationship between GPRA and the SCAP process, targets (GPRA  targets/annual
performance goals) and measures (GPRA and program measures) are defined as follows:

•       GPRA Targets/Annual Performance Goals are a subset of the overall planning and budgeting information that
        has traditionally been tracked by the Superfund program offices.  They are numerical goals that are established
        nationally prior to the start of the operating year; for example, 136 construction completions at Superfund
        National Priorities List (NPL) sites in FY 99.

•       Measures are activities deemed essential to  tracking  overall  program progress.  There are two types of
        measures: GPRA measures and program measures. GPRA measures simply track the number of actions that
        occur throughout the year (accomplishments) and are used to evaluate program progress; for example, the
        number of agreements negotiated states and tribes. Program measures are used to project the number of actions
        that each Region expects to perform during the year using anticipated  resources; for example, the number of
        sites where EPA settled based on ability-to-pay determinations.

    The  following pages contain, in pipeline order, the definitions of the FY 99/00 removal and remedial action
activities, GPRA Targets/Annual performance goals,  GPRA & Program measures, and removal and remedial action
project support activities.  Exhibit B.I displays the full list of removal and remedial action activities defined in this
Appendix. Exhibit B.2, at the end of this Appendix, illustrates the remedial action process.  Exhibit B.3, also at the end
of this Appendix, identifies planning requirements for all removal and remedial action activities.

SUPERFUND DURATIONS

    The  Superfund program has tracked  remedial pipeline durations for several years  in the  Superfund Senior
Management Reports as part of Superfund progress  evaluation.  As program management emphasis shifts from
administrative progress to more comprehensive measurement of program progress, OERR will track additional durations
besides the remedial pipeline durations.  These durations include: Engineering Evaluation/Cost Analysis (EE/CA)
duration; Expanded Site Inspection/Remedial Investigation (ESI/RI) duration; removal duration; average duration
between proposed listing to first removal or remedial action; and average duration from action memorandum to first
removal completion.  In FY 99/00, OERR will track the average action and site durations presented below. These
durations are not SCAP measures; they are presented  here for informational purposes only. HQ is responsible for
calculating and publishing the durations in the Superfund Senior Management Reports; however, Regions are responsible
for entering and maintaining accurate data from which durations can be derived.
                                                  B-l                                       July 1, 1998

-------
OSWER Directive 9200.3-14-IE

    The durations only cover non-Federal actions and are calculated based on actual dates.  In addition, they do not
    include takeovers (within actions) or phased actions.  These durations are tracked by the response and enforcement
    programs.

•        Average Remedial Investigation/Feasibility Study (RI/FS) Duration

•        Duration from Record of Decision (ROD) to Remedial Design (RD) Start
                                                                        ,
•        Duration from ROD to Remedial Action (RA) Start
July 1, 1998
B-2

-------
                                                                   OSWER Directive 9200.3-14-IE
                                         EXHIBIT B.I
                               RESPONSE ACTION ACTIVITIES
"-*- &- .,- /: **
— - , ^ -- >? ^ % ,
ACTIVITY?. "" •> '''{
/ * •"" N
" - ~ j, J. * ^ V, t*V
", '''*•* ^ S *
f f^.
Engineering Evaluation/Cost Analysis (EE/CA)
Support Agency Assistance
Technical Assistance
Remedial Investigation (RI) Starts
Feasibility Study (FS) Starts
Combined RI/FS Starts
Treatability Studies
Start of Public Comment Period (Proposed Plan to Public)
RI/FS Duration
Decision Document Signed
ROD Amendments and Explanation of Significant Differences
Pre-Design Assistance
RD Start
RD Completion
RA Start
RA Contract Award
Start of Response Action/ Activity
Operational and Functional (O&F)
Long-Term Response Action (LTRA)
Completion of a Response Action/ Activity
NPL Site Construction Completions
Operation and Maintenance (O&M)
IGPBA,
Target/Annual
Performance"
Goal, /
"'s. "














S

S



S

:' .'MEASURE
/ «L
GPRA








^










/


PROGRAM
t *
S
S
/
/
/
/
/
/

/
/
/
/
/

/

/
^


/
NOTE: Accomplishments are pulled from WasteLAN on a semi-annual basis.
                                             B-3
July 1, 1998

-------
OSWER Directive 9200.3-14-1E
                                    EXHIBIT B.I (continued)
                               RESPONSE ACTION ACTIVITIES
ACTIVITY
NPL Site Completions
Five- Year Reviews
Partial NPL Deletion
Final NPL Deletion
Non-NPL Site Completion
Indicators A-C Progress Through Environmental Indicators
GPRA
-Target/Annual
Performance
Goal






MEASURE
GPRA
/



/
,/
PROGRAM

/
/
/


NOTE: Accomplishments are pulled from WasteLAN on a semi-annual basis.
July 1, 1998
B-4

-------
                                                                        OSWER Directive 9200.3-14-1E

RESPONSE ACTION DEFINITIONS

ENGINEERING EVALUATION/COST ANALYSIS (EE/CA)

Definition:
The EE/CA identifies objectives for a Non-Time Critical (NTC) response action, and includes an analysis of cost,
effectiveness, and implementability of the various alternatives that may be used to satisfy these objectives.

Definition of Accomplishment:
The actual start date of an EE/CA is the date that the appropriate Regional official signs the EE/CA Approval
Memorandum. This information should be recorded in WasteLAN as the actual start date (Actual Start) of the EE/CA
(Action Name = Engineering Eval/Cost Analysis).  The actual completion date of an EE/CA is the date that the
appropriate Regional official signs the Action Memorandum. This information should be recorded  as the actual
completion date (Actual Complete) of the EE/CA (Action Name = Engineering Eval/Cost Analysis).

Changes in Definition FY 98 - FY 99/00:                                                      }
None
                                                                               /
Special Planning/Reporting Requirements:
EE/CAs are planning measures. They are reported site-specifically in WasteLAN. Funds for EE/CAs are contained in
the site characterization AOA. This is a program measure.

SUPPORT AGENCY ASSISTANCE

Definition:
The activities performed by another entity to support an EPA response is support agency assistance. The support agency
furnishes necessary data to EPA, reviews response data and documents, and provides other assistance to EPA.

EPA may provide States, political subdivisions, and Indian Tribes with funding to carry out a variety of management
responsibilities via a support agency Cooperative Agreement to ensure the meaningful and substantial involvement in
response activities.

Unless otherwise specified in the Cooperative Agreement, all support agency costs, with the exception of RA support
agency costs, may be planned under a single Superfund account number designated specifically for support agency
activities.  RA support agency activities must be planned site-specifically and require cost share provisions.

Definition of Accomplishment:
The start of support agency assistance (Action Name = Management Assistance) is the signature of the Cooperative
Agreement by the Regional Administrator or his designee.  The completion of support agency assistance is the
completion of all remedial activities at the site.

Changes in Definition FY 98 - FY 99/00:
None

Special Planning/Reporting Requirements:
Funds for support agency assistance are contained in the site characterization, enforcement, or Federal facility AOA.
Planned and actual start and completion dates are not required in WasteLAN. Funds may be planned or obligated site
or non-site specifically; however, they must be outlayed site-specifically. This is a program measure.
                                                B-5                                     July 1, 1998

-------
OSWER Directive 9200.3-14-IE

TECHNICAL ASSISTANCE

Definition:
Technical assistance is support provided by a third party to EPA regions to conduct response activities. Third parties
that may provide assistance include U.S. Army Corps of Engineers (USAGE), US EPA laboratories, U.S. Fish and
Wildlife Service, Alternative Remedial Contracting Strategy (ARCS), Superfund Technical Assistance and Response
Team (START) and Response Action Contracts (RAC) contractors.

Definition of Accomplishment:
The start of technical assistance (Action Name = Technical Assistance) is the obligation of funds for technical assistance.
The completion is defined as the completion of the response activities for the stage at which technical assistance was
requested.

Changes in Definition FY 98 - FY 99/00:
None
                                                                   i
Special Planning/Reporting Requirements:
Technical assistance is paid for by the response program and is contained in the site characterization AOA.  Planned and
actual start and completion dates are not required in WasteLAN. Funds may be planned or obligated site- or non-site
specifically; however, they must be outlayed site-specifically. This is a program measure.

REMEDIAL INVESTIGATION (RI) STARTS

Definition:
The purpose of the RI is to collect data necessary to adequately characterize the site for the purpose of developing and
evaluating effective remedial alternatives. The RI provides information to assess the risks to human health and the
environment and to support the development, evaluation, and selection of appropriate response alternatives.

The RI may be conducted alone,  as part of a site-wide integrated ESI/RI assessment, or as a combined Remedial
Investigation/Feasibility Study (RI/FS). The  start of an RI/FS is a program measure.  The RI start  and RI/FS start
definitions are the same.  Regions  are not required to enter the RI start date if the RI is being conducted as part of an
ESI/RI or RI/FS.

Obligation of funds for forward planning, community relations and/or other support activities do not constitute a RI start.

Definition of Accomplishment:
Fund-financed  (Including F-, TR - and S-lead actions) - Credit for a Fund-financed RI (Action Name = Remedial
Investigation) start is  received when funds are obligated and the actual start date (Actual Start) has been recorded in
WasteLAN. Funds are obligated when:

•       The contract modification  or work assignment for the RI has been signed by the EPA Contracting Officer (CO);
        or

•       An IAG has been signed by the other Federal agency  [ Bureau of Reclamation (BUREC) or USAGE]; or

•       A Cooperative Agreement has been signed by the Regional Administrator or designee to conduct a RI.
                                                                   I
If a subsequent RI is initiated without a new obligation of funds, the start date as recorded in WasteLAN is defined as
EPA's written approval of the work plan for the subsequent RI.


PRP-financed under Federal enforcement (Includes RP- and MR-lead actions) -  A PRP- financed RI (Action Name

July 1, 1998                                        B-6

-------
                                                                           OSWER Directive 9200.3-14-1E

= PRP RI) under Federal enforcement starts when one of the following enforcement actions occurs:

•       An Administrative Order on Consent (AOC), in which the Potentially Responsible Parties (PRPs) agree to
        conduct the RI, is signed by the Regional Administrator or delegatee. The RI start date (Actual Start) is the date
        the AOC is signed .  This is reported in WasteLAN as the AOC (Action Name = Administrative Order on
        Consent) completion date (Actual Complete); or

•       A Consent Decree (CD),  in which the PRPs agree to conduct the RI, is referred by the Region to Department
        of Justice (DOJ) or HQ. The RI start date (Actual Start) is the date the Regional Administrator signs the memo
        transmitting the CD to HQ or DOJ. This is recorded in WasteJ_AN as the CD (Action Name = Consent Decree)
        actual start date (Actual Start).

PRP-financed under State enforcement (PS-lead actions) -  A PRP-financed RI (Action Name = PRP RI) under State
enforcement starts when a State order or comparable enforcement document (Action Name = State Order or State
Decree), in which the PRPs agree to conduct the RI, is signed by the last appropriate State official or party (Actual
Complete) and the site is covered  by one of the following:

•       State enforcement Cooperative Agreement signed by the Regional Administrator; or

        Superfund Memorandum of Agreement  (SMOA) signed by the appropriate State and  Regional official
        containing a schedule for RI work at the site;  or

•       A general SMOA signed by the appropriate State and Regional officials covering remedial  work to be
        undertaken with schedules defined before work commences; or

•       Other State/EPA agreement signed by the appropriate State and Regional official.

If a subsequent RI is initiated without a new or amended AOC, CD, State order, or other comparable State enforcement
document, the start date for the RI as recorded in  WasteLAN is documented by a letter, form, or memo from EPA or
the State approving the work plan for the subsequent RI.

If an AOC, State order, or other comparable State enforcement document is amended for the subsequent RI, the start date
is the date the last State official or Regional Administrator/delegatee signs the amendment. If a Federal CD is amended,
the start date is the date on which the memo transmitting the CD to HQ or DOJ is signed by the Regional Administrator.

In-house (EP-lead action) - Credit for an in-house RI (Action Name = Remedial Investigation) start is received on the
date that the Region conducts the initial RI scoping meeting.  The start (Actual Start) is documented by a memo to file
containing the minutes from the meeting.

Changes in Definition FY 98 - FY 99/00:
For PRP-financed actions, the enforcement instrument is signed by the Regional Administrator or delegatee.

Special Planning/Reporting Requirements:
Regions are not required to enter the RI start date if the RI is being conducted as part of an RI/FS or site-wide ESI/RI.
The RI actual start date is reported site-specifically in WasteLAN. For PRP-financed RIs, both the RI start (Actual Start)
and the CD start (Actual Start) or AOC , State Order, or State Decree completion dates (Actual Complete) must be
entered into WasteLAN.  These  dates should be the  same. Funds for RIs and RI oversight are found  in the site
characterization AOA. This is a program measure.
                                                  B-7                                       July 1, 1998

-------
OS WER Directive 9200.3-14-1E

FEASIBILITY STUDY (FS) STARTS

Definition:
The primary objective of a FS is to ensure that appropriate remedial alternatives are developed and evaluated such that
an appropriate remedy may be selected.

The FS may be conducted alone or as part of a combined RI/FS. Combined RI/FS starts are program measures. Regions
are not required to enter the FS start date if the FS is being conducted as part of a combined RI/FS.
                                                                   i        .  \
Obligation of funds for forward planning, community relations and/or other support activities does not constitute a FS
start.

Definition of Accomplishment:
Fund-financed (Including F-, TR- and S-lead actions) - Credit for a Fund-financed FS (Action Name = Feasibility
Study) start is received when funds are obligated and the actual start date (Actual Start) is entered into WasteLAN.
Funds are obligated when:
                                                                         .
•       The contract modification or work assignment for the FS has been signed by the EPA CO; or

•       An IAG has been signed by the other Federal agency (USAGE or BUREC); or

•       A  Cooperative Agreement has been signed by the Regional Administrator or his designee to conduct a FS.


If a first or subsequent FS is initiated without a new obligation  of funds, the start date as recorded in WasteLAN is
defined as the date of EPA's written approval of the work plan for the FS.
                                                                   i
PRP-financed under Federal enforcement  (Including RP- and MR-lead actions ) -  A PRP- financed FS (Action
Name = PRP FS) under Federal enforcement starts when one of the following enforcement actions occurs:
                                                                   j
•       An AOC that addresses FS activities is signed by the Regional Administrator or delegatee.  The FS start date
        (Actual Start) is the date the AOC  is signed . This is recorded in WasteLAN as the AOC (Action Name =
        Administrative Order on Consent) actual completion date (Actual Complete); or

•       A CD that addresses FS activities is referred by the Region to DOJ or HQ. The FS start date (Actual Start) is
        the date (Actual Start) of signature by the Regional Administrator on the memo transmitting the CD (Action
        Name = Consent Decree) to DOJ or HQ.

PRP-financed under State enforcement (PS- lead actions) -  A PRP-financed FS (Action Name = PRP FS) under State
enforcement starts when a State order or comparable enforcement document (Action  Name =  State Order or State
Decree), in which the PRPs  agree to conduct the FS, is signed by the last appropriate State official or party (Actual
Complete),  and the site is covered by one of the following:

•       State enforcement Cooperative Agreement signed by the Regional Administrator; or

•       SMOA sighed by the appropriate State and Regional official containing a schedule for FS work at the site; or

•       Other State/EPA agreement signed by the appropriate State and Regional official.

If a first or subsequent FS is initiated  without a new or amended AOC, CD, State order, or other comparable State
enforcement document, the  start date  of the FS  is documented by a letter, form, or memo from EPA or the State
approving the work plan for the subsequent FS.
July 1, 1998                                       B-S

-------
                                                                           OSWER Directive 9200.3-14-IE

 If an AOC, State order, or other comparable State enforcement document is amended for the first or subsequent FS, the
 actual start date is the date the last State official or the Regional Administrator/delegatee signs the amendment. If
 Federal CD is amended, the start date is the date the Regional Administrator signs the memo transmitting the CD to HO
 orDOJ.

 In-house (EP-lead action) - Credit for an in-house FS (Action Name - Feasibility Study) start is received on the date
 that the Region conducts the initial FS scoping meeting. The start date (Actual Start) is documented by a memo to file
 containing the minutes from the meeting.

 Changes in Definition FY 98 - FY 99/00:
 For PRP-financed actions, the enforcement instrument is signed by the Regional Administrator or delegatee.

 Special Planning/Reporting Requirements:
 Regions are not required to enter the FS start date if the FS is being conducted as part of a combined RI/FS.  The FS or
 combined RI/FS actual start date is entered into WasteLAN site-specifically.  For a PRP-financed FS, both the FS start
 date (Actual Start) and the CD start date (Actual Start), or the AOC, State Order or State Decree actual completion date
 (Actual Complete) must be entered into WasteLAN. These dates should be the same.  Funds for FS and FS oversight
 are contained in the site characterization AOA. This is a program measure.

 COMBINED RI/FS START

 Definition:
 The purpose of the RI/FS is to assess site conditions and evaluate alternatives to the extent necessary to select a remedy.

 The start of an RI/FS is a program measure. The RI/FS start and the RI start definition are the  same.  Regions are not
 required to enter the RI start date if the RI is being conducted as part of an RI/FS or a site-wide ESI/RI.  Regions are not
 required to enter the FS start date if the FS is being conducted as part of a RI/FS.

 Obligation of funds for forward planning, community relations and/or other support activities do not constitute  a RI/FS
 start.
Definition of Accomplishment:
Fund-financed (Including F-, TR- and S-lead actions) - Credit for a Fund- financed RI/FS (Action Name = Combined
RI/FS) start is received when funds are obligated and the actual RI/FS start date (Actual Start) is reported in WasteLAN.
Funds are obligated when:

•       The contract modification or work assignment for the RI/FS has been signed by the EPA CO; or

        An IAG has been signed by the other Federal agency (USAGE or BUREC); or

        A  Cooperative Agreement has been signed by the Regional Administrator or designee to conduct a RI/FS.

If a first or subsequent RI/FS is initiated without a new obligation of funds, the start date is defined as the date of EPA's
written approval of the work plan for the RI/FS.

PRP-financed under Federal enforcement (Includes RP- and MR-lead actions) - A PRP-financed RI/FS (Action
Name = PRP RI/FS) under Federal enforcement starts when one of the following enforcement actions occurs:

        An  Administrative Order on Consent (AOC), in which the potentially responsible parties (PRPs) agree to
        conduct the RI/FS,  is signed by the Regional Administrator or delegatee.  The RI/FS start date (Action Name
        = PRP RI/FS) is the date the AOC is signed.  This  is recorded in  WasteLAN as the AOC (Action Name =
        Administrative Order on Consent) completion date (Actual Complete); or


                                                 B-9                                       July 1, 1998

-------
OSWER Directive 9200.3-14-IE
                                                                     !
•       A Consent Decree (CD) in which the PRPs agree to conduct the RI/FS, is referred by the Region to DOJ or HQ.
        The RI/FS start date (Actual Start) is the date the Regional Administrator signs the memo transmitting the CD
        to HQ or DOJ. This is recorded in WasteLAN as the CD (Action Name = Consent Decree) actual start date
        (Actual Start).

PRP-flnanced under State enforcement (PS-lead actions) - A  PRP-financed RI/FS (PRP  RI/FS) under  State
enforcement starts when a State order or comparable enforcement document (Action Name = State Order or  State
Decree), in which the PRPs agree to conduct the RI/FS, is signed by the last appropriate State official or party (Actual
Complete) and the site is covered by one of the following:
                                                                       t
•       State enforcement Cooperative Agreement signed by the Regional Administrator; or

•       SMOA signed by the appropriate State and Regional official containing a schedule for RI/FS work at the site;
        or                                                           '.

•       Other State/EPA agreement signed by the appropriate State and Regional officials.

If a first or subsequent RI/FS is initiated without a new or amended AOC, CD, State order, or other comparable State
enforcement document, the start date of the RI/FS is documented by a letter, form, or memo from EPA or the State
approving the work plan for the subsequent RI/FS.

If an AOC, State order, or other comparable State enforcement document is  amended for the first or subsequent RI/FS,
the start date is the date on which the last State official or Regional Administrator/delegatee signs the amendment.  If
an  CD is amended, the start date is the date on which the memo transmitting the CD to HQ or DOJ is signed by the
Regional Administrator.

In-house (EP-lead action) - Credit for an in-house RI/FS (Action Name = Combined RI/FS) start is received when the
Region has the initial RI/FS  scoping  meeting and the date is entered into WasteLAN. The start (Actual Start)  is
documented by a memo to file containing the minutes from the meeting.

Changes in Definition FY 98 -  FY 99/00:
For PRP-financed actions, the enforcement instrument is signed by the Regional Administrator or delegatee.

Special Planning/Reporting Requirements:
Regions are not required to report a combined RI/FS start if a separate RI and FS are being conducted. The combined
RI/FS actual start date is entered into  WasteLAN site-specifically. For a PRP-financed RI/FS, the  RI/FS start date
(Actual Start) and the CD start date (Actual Start), or AOC State Order, or State Decree actual completion date (Actual
Complete) must be entered into WasteLAN. These dates should be the same. Funds for RI/FS and RI/FS oversight are
contained in the site characterization AOA. This is a program measure.


TREATABILITY STUDIES
                                                                     i
Definition:
Treatability studies are laboratory or field tests used to evaluate and implement one or more remedial alternatives.

Definition of Accomplishment:
Fund-financed (F-, S- or TR- lead) -  The start date is the date of EPA's written approval, as reflected in WasteLAN,
of the treatability study work plan.  The completion is the written approval of the report on the results of the treatability
study.
 July 1, 1998                                      B-10

-------
                                                                          OSWER Directive 9200.3-14-IE

 PRP-financed (RP-, MR- or PS-lead) - The treatability study starts when EPA approves, in writing, the treatability
 study work plan submitted by the PRP. The completion is the approval of the report on the results of the treatability
 study.

 Changes in Definition FY 98 - FY 99/00:
 None

 Special Planning/Reporting Requirements:
 Treatability study (Action Name = Treatability Studies) planned and actual start (Planned Start and Actual Start) and
 completion (Planned Complete and Actual Complete) dates are not required in WasteLAN.  Treatability studies are
 funded as part of an ES1/RI, RI/FS, or RD. Dollars are not budgeted, planned, or obligated separately. This is a program
 measure.
 START OF PUBLIC COMMENT PERIOD (PROPOSED PLAN TO PUBLIC)

 Definition:
 The FS or RI/FS report is released to the public when the contamination at the site has been characterized and alternatives
 for remediation have been evaluated.

 Definition of Accomplishment:
 The Start of Public Comment Period (Proposed Plan to Public) is accomplished either (1) on the date the appropriate
 Regional official signs a letter transmitting RI/FS reports and the proposed plan to the site repository for public review,
 or (2) when the first page of the approved proposal plan, which lists the dates the public comment period starts and ends!
 is included in the site file.  This date must be recorded in WasteLAN as the actual completion date (Actual Complete)
 of the SubAction, Start of Public Comment (Action Name = Feasibility Study or Combined RI/FS or PRP FS or PRP
 RI/FS and SubAction Name = Start of Public Comment).

 Changes in Definition FY 98 - FY 99/00:
 None

 Special Planning/Reporting Requirements:
 Accomplishments are based on the first proposed plan released to the public for each FS or RI/FS, regardless of lead
 This is a program measure.


 RI/FS DURATION

 Definition:
 The purpose of the RI/FS is to assess site conditions and evaluate alternatives to the extent necessary to select a remedy.

 The RI/FS starts with the obligation of Fund monies; or the signature of an AOC, State Order, or State Decree for the
 RI or RI/FS or the transmittal of a CD for RI or RI/FS to HQ or DOJ; or the conduct of the RI/FS scoping meetina and
 culminates with the signature of the ROD.

The objective of this measure is to focus on good project management of critical portions of the traditional remedial
pipeline and establish  a methodology which  accurately assesses program  performance. Duration trends provide
indicators of areas that require attention.

Only RI/FS projects that started post-SARA will be used  for comparison and evaluation purposes.
                                                B-ll                                      July 1, 1998

-------
OSWER Directive 9200.3-14-IE

Definition of Accomplishment:
This measure includes all RI/FS projects that have a targeted completion date in FY 99/00.  The RI/FS duration will be
calculated based on the RI or Combined RI/FS Start and Decision Document Signed (ROD completion) definitions
specified in this Manual. Regional performance in FY 99/00 will be compared to:

       The Regional and national average duration of RI/FS projects completed in FY 97 and FY 98 or FY 99/00;

       The Regional and national average duration of RI/FS projects completed in previous quarters of FY 99/00

Changes in Definition FY 98 - FY 99/00:
None

Special Planning/Reporting Requirements:
WasteLAN will automatically look at actual RI or RI/FS start dates and actual ROD completion dates. HQ will perform
the analysis of the average durations. Fund and PRP durations will be tracked. RI/FS duration  is a GPRA measure.

DECISION DOCUMENT  SIGNED
                                                                   I

Definition:
A "Decision Document" is developed to identify each decision (at NPL, non-NPL, and NPL caliber sites) to:

•       Perform an emergency, time-critical, or Non-Time Critical (NTC) removal; or

•       Perform a remedial action
                                                                   I
                                                                   j
Definition of Accomplishment:
Removals (Emergency, Time Critical, or NTC) - The date the On-Scene Coordinator (OSC), AA OSWER, or designated
Regional official signs the first or original Action Memorandum for each removal.  (Regions will not receive credit
 for subsequent Action Memos, e.g., ceiling increases at the same removal.) The date of the signature is recorded in
WasteLAN as the actual completion date (Actual Complete) of the SubAction, Approval of Action Memo or Removal
Action Memo Document. To receive credit for the Action Memo, the Region must enter the response technologies to
 be implemented in the removal.

Remedial Actions - The date the Regional Administrator/Deputy Regional Administrator or the  AA OSWER signs the
 ROD for each RA.  This date must be reported in WasteLAN as the actual RI/FS (Action Name = Combined RI/FS or
 PRP RI/FS) or FS (Action Name = Feasibility Study or PRP FS) and ROD (Action Name = Record  of Decision)
 completion dates (Actual Complete). Final RODs will be tracked as a component of this target. To receive credit for
 the ROD, the Region must enter the technologies selected and their estimated cost (RA Cost Estimate).

 For State-lead, State-signed RODs, where the ROD also is signed by EPA, accomplishments are reported as the date the
 State signs the ROD (as  long as the date of the EPA signature precedes or is the same as the date  of the State signature).

 These decisions will be tracked separately but reported on a combined basis.

 Changes in Definition FY 98 - FY 99/00:
 Decision Document signed is no longer a target.  It is a program measure.  Early actions (remedial authority)  were
 deleted.  Changed early actions (removal authority) to removals.
 July 1,1998                                     B-12

-------
                                                                       OSWER Directive 9200.3-14-IE

 Special Planning/Reporting Requirements:
 In order to identify the response technologies selected in the Action Memo, the Region must enter the media addressed
 through the action (Media Type and Media Name) and the Selected Response Actions into WasteLAN.  To identify the
 response technologies selected in the ROD, the Region must enter the name of the selected alternative (Alternative
 Name), the media addressed in the ROD (Media Type and Media Name) and the Selected Response Actions into
 WasteLAN.  This is a program measure.


 ROD AMENDMENTS AND EXPLANATION OF SIGNIFICANT DIFFERENCES (ESDs)

 Definition:
 ROD Amendments
 A ROD Amendment occurs when there are fundamental changes to the remedy. A fundamental change is when the
 hazardous waste management approach selected in the ROD is reconsidered. For each ROD Amendment the ROD
 process (revised proposed plan, public comment period, public meeting, responsiveness summary, and amended ROD)
 should be repeated.

 ESDs
 When significant changes are made to a component of a remedy, an explanation of significant differences (ESDs) should
 be prepared.  ESDs do not fundamentally alter the overall approach intended by a remedy. The BSD is made available
 to the public  and placed in the Administrative Record.

 Definition of Accomplishment:
 ROD Amendments - The date the Regional Administrator/Deputy Regional Administrator signs the amended ROD
 should be recorded in WasteLAN as the actual completion date (Actual Complete) of the ROD Amendment subAction
 (Action Name = Record of Decision and SubAction Name = ROD Amendment).

 ESDs - The date the BSD is placed in the Administrative Record is reported as the actual completion date  (Actual
 Complete) of the BSD SubAction (Action Name = Record of Decision and SubAction Name = Explanation of Significant
 Diff).

 Changes in Definition FY 98 - FY 99/00:
 None

 Special Planning and Reporting Requirements:
 ESDs and ROD amendments are being tracked as program measures. Regions should enter the following information
 into WasteLAN for the amended ROD and ESDs: Alternative Name; Media Type;  Media Name; Response Actions
 Selected; and RA Cost Estimate. This is a program measure.


PRE-DESIGN ASSISTANCE

Definition:
Pre-design assistance activities are undertaken by the USAGE in preparation for initiating RD activities. This includes:

•       Synopsizing RD requirements in the Commerce Business Daily (CBD);

•       Developing architect/engineer (A/E) firm pre-election list;
                                              B-13                                     July 1, 1998

-------
OSWER Directive 9200.3-14-IE

•        Contacting A/E firms on the pre-selection list to ascertain interest in project;

•        Developing A/E selection list; and

•        Tentatively selecting A/E firm.

Definition of Accomplishment:
The initiation of pre-design assistance (Action Name = Design Assistance) is the signature of the IAG by USAGE
(obligation of funds).  The completion of design assistance is the start of RD.

Changes in Definition FY 98 - FY 99/00:
None

Special Planning/Reporting Requirements:
Funds for pre-design  assistance should be obligated prior to the signature of the ROD. Planned and actual start and
completion dates are not required in WasteLAN. Funds may be planned site-or non-site specifically; however, they must
be obligated site-specifically.  Funds for design assistance are in the site characterization AOA. This is a program
measure.

REMEDIAL DESIGN (RD) START

Definition:                                                         ;
The RD converts the remedy selected in the ROD into a final design document for the RA. The obligation of funds for
design assistance or technical assistance does not constitute a RD start.

Pre-design activities will not be counted as a RD start.

Definition of Accomplishment:
Fund-Financed (F-, TR-, and S-lead actions) - A Fund-financed RD (Action Name = Remedial Design) is started
(Actual Start) when funds are obligated.  An obligation is made when:

•         The EPA Contracting Officer (CO) signs the contract modification or work assignment for the RD; or

 •         A Cooperative Agreement is signed by the Regional Administrator or his designee; or

 •         An IAG is signed by the other Federal agency.

 In those instances where design assistance is conducted prior to ROD signature, and there is not a new obligation of funds
 for a subsequent RD, the start of RD is defined as the written approval of the work plan to conduct these activities.  If
 there is a new obligation of funds, the start of RD is defined as the date funds are  obligated. When a RD has been
 prepared by other parties (e.g., water lines where the city already prepared plans and specifications) or plans developed
 for a similar site will  be used, the RD actual start date is the same as the RA actual start date.
                                                                     i          I
 PRP-financed under Federal enforcement (RP-lead) - The start (Actual Start) or a RP-lead RD (Action Name= PRP
 RD) is credited on the date the earlier of the following actions takes place:

 •       The enforcement document under which the RD is to be conducted becomes effective:

        For an Administrative Order on Consent (AOC), this is the date of signature of the AOC for RD by the Regional
        Administrator or his delegatee, or the date of signature of an amendment to an existing AOC to include RD;
        For a Unilateral Administrative Order (UAO), this is the date of the PRP's written notice of intent to comply with
        theUAO;


 July 1, 1998                                      B-14

-------
                                                                        OSWER Directive 9200.3-14-1E

       For a CD, this is either the date the CD is lodged by the DOJ, or the date the CD is entered with the court
       (depending on the wording of the CD); or

 •       An official written notice to proceed is issued by EPA to the PRP.

 PRP-financed under Federal enforcement (MR-lead) - The start (Actual Start) of a MR-lead RD (Action Name = PRP
 RD) is credited on the date the earlier of the following actions takes place:

 •       The enforcement document under which the RD is to be conducted becomes effective:

       For an Administrative Order on Consent (AOC), this is the date of signature of the AOC for RD by the Regional
       Administrator or his delegatee, or the date of signature of an amendment to an existing AOC to include RD;

       For a CD, this is either the date the CD is lodged by the DOJ, or the date the CD is entered with the court
       (depending on the wording of the CD); or

 •       An official written notice to proceed is issued by EPA to the PRP.

 •  PRP-financed under State enforcement (PS-lead actions) - Credit will be given (Actual Start) for a PS-lead RD
   (Action Name=PRP RD) based on the issuance or effective date of a State order or other comparable State
   enforcement document for RD (or combined RD/RA).  If the RD is covered by a pre-existing State order, credit will
   be based on the notice to proceed date.


 Changes in Definition FY 98 - FY 99/00:
 Deleted the UAO for MR-lead RD actions.

 Special Planning/Reporting Requirements:
 The actual start date (Actual Start) of the RD (Action Name = Remedial Design or PRP RD) must be entered into
 WasteLAN. Accomplishments are reported site-specifically. Funds for RDs are in the site characterization AOA. This
 is a program measure.

 RD COMPLETION

 Definition:
 The RD converts the remedy selected in the ROD into a final design document for RA.

 Definition of Accomplishment:
 A RD is complete when:

 •   Fund-financed (F-, TR-, and S-lead actions) - EPA approves, in writing, the final design document.

 •  PRP-flnanced under Federal enforcement (MR- and RP-lead actions) - EPA approves, in writing, the final design
   document.

 •   PRP-financed under State enforcement (PS-lead actions) - the State approves the final design document.

 Changes in Definition FY 98 - FY 99/00:
None

Special Planning/Reporting Requirements:
The actual completion date (Actual Complete) of the RD (Action Name = Remedial Design or PRP RD) must be entered
into WasteLAN.  Accomplishments are reported site-specifically. This is a program measure.


                                               B-15.                                     July 1, 1998

-------
OSWER Directive 9200.3-14-IE
                                                                     I


REMEDIAL ACTION (RA) START
                                                                     i
Definition:
A RA is the implementation of the remedy selected in the ROD. Remedial actions can only be funded at sites that are
final on the NPL.

Definition of Accomplishment:
Remedial Action

•      Fund-financed (F-, TR-, and S-lead actions) - Credit for a RA start is given on the date a contract modification
       for the RA is signed by the EPA CO or the IAG is signed by the other Federal agency or Cooperative Agreement
       is awarded, and funds are obligated.
                                                                     I

       Credit for a subsequent RA start under an existing IAG is given on the date the amendment to the IAG to include
       the new work is approved.

       The actual start date (Actual Start) of the RA (Action Name = Remedial Action) is entered into WasteLAN.

•      PRP-financed under Federal enforcement (MR- and RP- lead actions) - Credit for a RA (Action Name=PRP
       RA start (Actual Start)is given when one of the following occurs and has been recorded in WasteLAN:

       -   If work is performed by the PRPs under the same CD or UAO (RP-lead RA only) as the RD, the RA start
           is the date EPA approves,  in writing, the PRP RD document (RD completion); or

       Where the Fund performed the RD or the RD was done under a settlement/order for RD and the PRPs are doing
       the RA under the terms of a CD, UAO (RP-lead RA only) or judgment for RA only, the RA start date (Actual
       Start) is the same as the date (Action Complete) of the PRP's written notice of intent to comply with the UAO
       for the RP-lead RA (Action Name = Unilateral Admin Order and SubAction Name = PRPs Ntfy EPA, Intent
       to Comply); or the date (Actual Start) the CD (Action Name = Consent Decree) is transmitted by the Regional
       Administrator to  HQ or the DOJ; or the date (Actual Complete) the judgment (Action Name = Judicial/Civil
       Judgment) was signed by the Federal judge. Where the PRP is in significant non-compliance with the UAO for
       the RP-lead RA, credit will be withdrawn.

 •     PRP-financed under State enforcement (PS-lead actions) - If the  PRP is doing v/ork under a State order or
       comparable enforcement document, and the site is covered by a State enforcement cooperative agreement or
       State Memorandum of Agreement (SMOA) with a schedule for remedial action work at  the site, and EPA
        approved the ROD, the RA (Action Name = PRP RA) start (Actual Start) is the date the  State  approves, in
        writing, the PRP RD document.
                                                                     |
For both Fund- and PRP-financed actions - The Region must identify the technologies to be constructed. To do this,
the following information must be entered into WasteLAN: the Alternative Name, Media Name, Media Type, and the
technology of the RA into the Response Action Type field (Selected Response Actions). Regions must also indicate the
RA is a long-term action  (Critical Indicator = Long-Term Action).

Limited Remedial Action - RODs where the only action selected is Monitored Natural Attenuation and/or Institutional
Controls.  Limited actions are distinguished from No Action/No Further Action RODs, such as those where groundwater
monitoring is the only response activity selected.

 •      Fund-financed (F-, TR-, and S-lead actions) - Credit for a Limited Action RA start is given on the date ROD
        selecting a limited remedial action is signed. The actual start date (Actual Start) is entered into WasteLAN with
        the RA (Action Name = Remedial Action).
 July 1, 1998                                      B-16

-------
                                                                        OSWER Directive 9200.3-14-IE

•      PRP-financed under Federal enforcement (RP-lead actions) - When the PRPs are doing the Limited Action
       RA (Action Name = PRP RA) under the terms of a CD, UAO or judgment for RA only, the RA start date (Actual
       Start) is the same as the date  (Action Complete) of the PRP's written notice of intent to comply with the UAO
       (Action Name - Unilateral Admin Order and SubAction Name = PRPs Ntfy EPA, Intent to Comply); or the date
       (Actual Start) the CD (Action Name = Consent Decree)  is transmitted by the Regional Administrator to HQ or
       the DOT; or the date (Actual Complete) the judgment (Action Name = Judicial/Civil Judgment) was signed by
       the Federal judge. Where the PRP is in significant non-compliance with the UAO, credit will be withdrawn.

•      PRP-financed under Federal enforcement (MR-lead actions) - When the PRPs are doing the Limited Action
       RA under the terms of .a CD or judgment for RA only, the RA start date (Actual Start) is the same as the date
       (Actual Start) the CD (Action Name = Consent Decree)  is transmitted by the Regional Administrator to HQ or
       the DOT; or the date (Actual Complete) the judgment (Action Name = Judicial/Civil Judgment) was signed by
       the Federal judge.

•      PRP-financed under State enforcement (PS-lead actions) - When the PRPs are doing the Limited Action RA
       (Action Name = PRP RA)  under a State order or comparable enforcement document, and the site is covered by
       a State cooperative agreement or SMOA with a schedule for work at the site, and EPA approved the ROD, the
       Limited Action RA starts (Actual Start) on the issuance or effective date of the enforcement instrument.

   For both Fund- and PRP-financed actions - The Region must identify the technologies to be constructed. To
   do  this, the following information must be  entered into WasteLAN:   the Alternative  Name,  Media Name,
   Media Type,  and the technology of the RA into the Response Action Type  field (Selected Response Actions).
   Regions must also indicate the RA is a limited remedial action (Critical Indicator = Limited Remedial Action).

Changes in Definition FY 98 - FY 99/00:
 Deleted early actions (remedial authority). Added language that RAs can only be performed at sites that are final on
the NPL

Special Planning/Reporting Requirements:
This is a GPRA target/annual performance goal. The actual start date (Actual Start) of the RA (Action Name = Remedial
Action or PRP RA), the critical indicator (Long-Term Action or Limited Remedial Action), and, for PRP-lead RAs, the
appropriate enforcement information must be entered into WasteLAN. The Region must enter the Alternative Name,
Media Name, Media Type, and the remedial response actions (Selected Response Actions) associated with the RA into
WasteLAN. Funds for Fund-financed RAs are planned on a site-specific basis and are placed by name in the RA AOA.
Funds for oversight of RP-lead RAs are planned on a site-specific basis and are found in the site characterization AOA.
See Long-Term Action Flow Chart at the end of this Appendix  (Exhibit B.2).


RA CONTRACT AWARD

Definition:
Award of RA contract is the date a contract for construction of the remedy is awarded.

Definition of Accomplishment:
Fund-financed (F-,TR-, and S-lead actions) - Date (recorded  in WasteLAN as an Actual Complete) when the EPA,
State, USAGE, or Bureau of Reclamation (BUREC) awards (signs) a contract to initiate a Fund-financed RA.

If the RAC or ARCS contractor is assigned RA responsibility, the award of RA contract is defined as the date the RA
subcontract is signed by the contractor. If the Emergency Response Cleanup Services (ERCS) or Emergency and Rapid
Response Services (ERRS) contractor will be performing the RA, award of RA contract is defined as the date (Actual
Complete) the contract modification for the RA is signed by the EPA CO.
                                                B-17                                      July 1, 1998

-------
OSWER Directive 9200.3-14-1E

PRP-financed under Federal enforcement (MR-, RP-, and PS-lead actions) - Date (recorded in WasteLAN as an
Actual Complete) when the PRP awards a contract to initiate the RA, as documented in a memorandum to the site file.

Changes in Definition FY 98 - FY 99/00:
None

Special Planning/Reporting Requirements:
The actual completion date (Actual Complete) must be placed in WasteLAN with the RA SubAction, Award of RA
Contract (Action Name = Remedial Action or PRP RA and SubAction Name = Award of Contract).  See Long-Term
Action Flow Chart at the end of this Appendix (Exhibit B.2). This is a program measure.
                                                                   i
                                                                   i

START OF RESPONSE ACTIONS/ACTIVITIES
                                                                   i           i
                    1 •                          '  •                  !           '

THE FOLLOWING DEFINITIONS ARE UNDER REVIEW.

Definition:
This measure counts all removal actions, remedial actions, limited remedial actions, or RODs for groundwater monitoring
only.

Removal Actions - Removal actions are responses performed at NPL, non-NPL, or NPL caliber sites that eliminate or
reduce threats to public health or the environment from the release, or potential release, of hazardous substances. These
risk reduction activities can be conducted as emergency responses, time-critical or NTC removal actions. This measure
tracks each early action (removal or remedial) start at a site.
                                                                              '
Remedial Actions - Remedial actions are cleanup responses intended to achieve the completion of more extensive site
remediation .  This measure tracks each remedial action  start at a site.
                                                                     .1
Limited Remedial Action - Limited remedial actions result from RODs which select monitored natural attenuation to
restore the groundwater and/or institutional controls as the only response actions. Limited actions are distinguished from
No Action/No Further Action RODs, such as those where groundwater monitoring is the only response activity selected.
Regions should enter monitored natural attenuation and institutional  controls as remedial actions (Action Name =
Remedial Action or PRP RA) in WasteLAN.

Groundwater monitoring is defined as the collection and analysis of groundwater samples as a result of a ROD that
addresses groundwater contamination at a site or operable unit. The ROD will specify that (1) groundwater monitoring
is the only activity that will be taken at the site, or (2) groundwater monitoring is the only activity that will be
implemented during a operable unit groundwater cleanup.  A ROD that specifies  groundwater monitoring with no
other activity anticipated is a no action ROD. Do not enter a groundwater monitoring action [Action Name =
Grndwtr Monitor (Post-ROD)] into WasteLAN if monitored natural attenuation to restore groundwater is the
only response action selected to address groundwater at the site or operable unit.
                                                                   i
Definition of Accomplishment:
Removal Action - A site is addressed by an removal action when the EPA, RAC, ARCS, ERRS, ERGS, State, or PRP,
or their contractors, have mobilized for construction of the removal action specified in the ROD or Action Memorandum.
                                                                   i
   •      Fund-financed (F-, TR-, S-, or CG- lead) actions - EPA, State or their contractors have begun work at a
          site for construction of the removal (emergency, time-critical,  or non-time critical) as documented by a
          Pollution Report (POLREP).  The date of on-site construction is reported in WasteLAN as the removal
          (Action Name = Removal Action) actual start date (Actual Start).
July 1, 1998                                     B-18

-------
                                                                         OSWER Directive 9200.3-14-lE

   •      PRP-financed (RP- and MR- lead) actions  under the terms of an AOC, UAO, CD, or judgment -  The
          PRPs or their contractors have begun work on-site for construction of the removal (emergency, time critical,
          or non-time critical) as documented in a POLREP and the PRPs provide written notice of intent to comply
          with a UAO, or an enforcement instrument has been signed by EPA and the PRPs, or a judgment has been
          signed by a Federal judge.

   The date of on-site construction is reported in WasteLAN as the removal (Action Name = PRP Removal) actual start
   date (Actual Start). The following information must be entered into WasteLAN for the enforcement instrument:

     -  The date the AOC (Action Name = Admin Order on Consent) was  signed by the PRPs and the designated
        Regional official (Actual Complete), and the Response Actions Achieved of "PRP Removal"; or

     -  The date (Actual Complete) the PRPs provide notice of intent to comply (Action Name = PRP Notfy EPA of
        Intent to Comply) with a UAO for a RP-lead removal signed (Actual Complete) by the designated Regional
        official (Action Name = Unilateral Admin Order), and the Response Actions Achieved of "PRP Removal"; or

     -  The date the CD (Action Name = Consent Decree) was signed by the PRPs, the designated Regional official,
        and the Federal judge (Actual Complete), and the Response Actions Achieved of "PRP Removal"; or

     -  The date a judgment (Action Name = Judicial/Civil Judgment) was signed by the Federal judge (Actual
        Complete), and the Response Actions Achieved of "PRP Removal".

   •    PRP-financed (PS-lead actions) under terms of a State Order or decree - The PRPs or their contractors have
        begun work on-site for construction of the removal (emergency, time critical, or  non-time critical) as
        documented in a POLREP and the  State enforcement instrument has been signed by the appropriate State
        official.

   •    PRP-financed (RP- lead actions) voluntary actions (no enforcement instrument exists) - The PRPs or their
        contractors have begun work at a site for construction of the removal (emergency, time-critical, or non-time
        critical) and EPA is part of the unified command as documented by a Pollution Report (POLREP). The date
        of on-site construction is reported in WasteLAN as the removal (Action Name = PRP Removal) actual start date
        (Actual Start). [This definition is under review]

For both Fund- and PRP-financed removals, the following additional information must be entered into WasteLAN:

  -  The Critical Indicator classification of the removal [(1) Time Critical, (2) Non-Time Critical, or (3) Emergency];

  -  The media addressed through the removal (Media Type);

  -  The Media Name; and

  -  The Response Action being conducted (Selected Response Actions).

 Remedial Action (RA On-Site Construction) - A site is addressed through a remedial action when the EPA, ARCS,
 RAC, the USAGE, BUREC, State or PRP, or their contractors, have begun work at a site for on-site construction of the
 remedial action remedy selected in the ROD.              -

 •    Fund-financed (F-, TR-, and S- lead actions) - EPA, the State or their contractors have begun  work for on-site
      construction of the remedy at a  site on the final NPL. A memo to file documenting that the contractor has
      mobilized to begin construction or a report of mobilization from the contractor is required. This date is entered
      into WasteLAN as the RA on-site construction subAction (Action Name = Remedial Action and SubAction Name
      = RA On-Site Construction) actual completion date (Actual Complete).  A Critical Indicator which classifies the
      RA as a Long-Term Action [Critical Indicator = (5) Long-Term Action] must be entered into WasteLAN.


                                                 B-19                                      July 1, 1998

-------
OSWER Directive 9200.3-14-1E
 •    PRP-financed under Federal enforcement (RP- and MR- lead actions) - The PRPs or their contractors have
      begun work at a site for on-site construction of the remedy. The date of on-site construction must be documented
      in a memorandum to the site file stating when the contractor began substantial and continuous remedial activity.
      A copy of a report of start up from the contracting party is also acceptable. The date of on-site construction must
      be entered into WasteLAN as the RA on-site construction SubAction (Action Name = PRP RA and Sub Action
      Name = RA On-Site Construction) actual completion date (Actual Complete).  Also, the RA must be classified
      as a Long-Term Action (Critical Indicator = (5) Long-Term Action).
                                                                   i
 In addition, to receive credit under this measure, the PRPs must be in compliance with a UAO, or an enforcement
 instrument signed by EPA and the PRPs, or a judgment signed by a Federal judge. The following information must
 be entered into WasteLAN for the enforcement instrument:

      -  The date (Actual  Complete) the PRPs provide notice of intent to comply (Action Name = PRP Notfy EPA
         of Intent to Comply) with a UAO for the RP-lead RA signed (Actual Complete) by the designated Regional
         official (Action Name = Unilateral Admin Order), and the Response Actions Achieved  of "PRP RA"; or

      -  The date the CD (Action Name = Consent Decree) was signed by the PRPs, the designated Regional official,
         and the Federal judge (Actual Complete), and the Response Actions Achieved of "PRP RA"; or

         The date a judgment (Action Name = Judicial/Civil Judgment) was signed by the Federal judge (Actual
         Complete), and the Response Actions Achieved of "PRP RA".

 •    PRP-financed under State enforcement (PS-lead actions) - The PRPs or their contractors have begun work at
      a site for on-site construction of the remedy.  The  date of  on-site construction must be documented in a
      memorandum to the site file stating when the contractor began substantial and continuous remedial activity.  A
      copy of a report of start up from the contracting party is also acceptable. The date of on-site construction must
      be entered into WasteLAN as the RA on-site construction SubAction (Action Name = PRP RA and SubAction
      Name = RA On-Site Construction) actual completion date (Actual Complete).  Also, the RA must be classified
      as a Long-Term Action (Critical Indicator = (5) Long-Term Action) in WasteLAN. In addition, to receive credit
      under this measure, the PRPs must be working under a State enforcement instrument.
                                                                   !
 For both Fund- and PRP-financed actions, the Region must identify the technologies being constructed. To do this,
 the following information must be entered into WasteLAN:

   -   The name of the Alternative being constructed (Alternative Name);

   -   The media addressed (Media Type);

   -   The Media Name; and

   -   The response actions being constructed  (Selected Response Actions) .

   Limited Remedial Action - RODs where the only action selected is Monitored Natural Attenuation and/or
   Institutional Controls. Limited actions are distinguished from No Action/No Further Action RODs, such as
   those where groundwater monitoring is the only response activity selected.

 •    Fund-financed (F-, TR-, and S-lead actions) - Credit for a Limited Action RA start is given on the date ROD
      selecting a limited remedial action is signed. The actual start date (Actual Start) is entered into WasteLAN with
      the RA (Action Name = Remedial Action).

 •    PRP-financed under Federal enforcement (MR- and RP- lead actions) - When the PRPs are doing the Limited
      Action RA under the terms  of a CD, UAO or judgment for Limited Action RA only, the RA start date (Actual
      Start) is the same as the date (Action Complete) of the PRP's written notice of intent to comply with the UAO
July 1, 1998
B-20

-------
                                                                        OSWER Directive 9200.3-14-1E

     for the RP-lead RA (Action Name = Unilateral Admin Order and SubAction Name = PRPs Ntfy EPA, Intent to
     Comply); or the date the CD is transmitted by the Regional Administrator to HQ or the DOT [as recorded in
     WasteLAN as the actual CD (Action Name = Consent Decree) start (Actual Start) and actual RA start (Actual
     Start)]; or the date a judgment (Action Name=Judicial/Civil Judgment) was signed by the Federal judge (Actual
     Complete). Where the PRP is in significant non-compliance with the UAO for the RP-lead RA, credit will be
     withdrawn.

•    PRP-financed under State enforcement (PS- and SD-lead) - If the PRP is doing work under a State order or
     comparable enforcement document, and the site is covered by a State enforcement cooperative agreement or State
     Memorandum of Agreement (SMOA) with a schedule for remedial work at the site, and EPA approved the ROD,
     the RA start is the date the State approves, in writing, the PRP RD document;

For both Fund- and PRP-financed actions - The Region must identify the technologies being constructed. To do this,
the following information must be entered into WasteLAN: the Alternative Name, Media Name, Media Type,  and the
technology of the RA into the Response Action Type field (Selected Response Actions) and indicate the RA is a limited
remedial action (Critical Indicator = Limited Remedial Action).

Groundwater Monitoring (as the only activity taken at the site or groundwater operable unit)
Credit is given for a groundwater monitoring [Action Name = Grndwtr Monitor (Post-ROD)] start (Actual Start) when:

•    Fund-financed (F-, TR-, and S- lead actions) - Funds are obligated for the groundwater monitoring.  Funds are
     obligated when:

  -  A contract modification or work assignment for groundwater monitoring is signed by the EPA CO; or

  -  A Cooperative Agreement  for groundwater monitoring is signed by the Regional Administrator  or his/her
     designee; or

  -  An IAG for groundwater monitoring is signed by the other Federal agency.

•    PRP-financed under Federal enforcement (MR- and RP- lead actions) - PRP-financed groundwater monitoring
     under Federal enforcement starts when:

  -  An AOC which includes groundwater monitoring is signed by the PRPs and the designated Regional official; or

  -  PRPs provide notice of intent to comply with a UAO which includes groundwater monitoring

•    PRP-financed under State enforcement (PS-lead actions) - PRP-financed groundwater monitoring under State
     enforcement starts when a State order or  comparable State enforcement document is signed by the last State
     official.

Changes in Definition FY 98 -  FY 99/00:
Expanded definitions for PRP-financed action under state enforcement.

Special Planning/Reporting Requirements:
Fund, PRP with enforcement instrument, and  PRP voluntary removal starts, RAs, limited remedial  actions, and
groundwater monitoring (post-ROD) starts will be tracked separately for management purposes. The date of RA on-site
construction (Action Name = Remedial Action  and SubAction Name - RA On-site Construction)  will be used for
purposes of establishing the Statute of Limitation  (SOL) determination. This is a GPRA target/annual performance goal.
                                               B-21                                      July 1, 1998

-------
OSWER Directive 9200.3-14-IE

 OPERATIONAL AND FUNCTIONAL (O&F)

 THE FOLLOWING DEFINITION IS UNDER REVIEW.
                                                                  I
 Definition:
 O&F activities are conducted after physical construction of the remedy is complete to ensure that it is functioning
 properly  and operating as designed. The NCP provides for a maximum timeframe of one year for performing O&F
 activities, though EPA may extend the one-year period, as appropriate.

 Definition of Accomplishment:
 O&F starts (Actual Start)  occurs after  the State/EPA conduct a joint inspection and concur, through a joint
 memorandum, that the O&F period can occur.

 O&F is complete either one year after the construction of the remedy is complete, or when the remedy is determined
 concurrently by EPA and the State to be functioning properly and performing as designed, whichever is earlier. The
 date is documented in the RA Report. If the remedy requires LTRA, the completion of O&F is documented in the
 interim RA Report.

 Changes in Definition  FY 98 - FY 99/00:
  The O&F Start was changed to reflect the NCP language. The O&F Completion definition was expanded to include
 LTRA.                                                          !

 Special Planning/Reporting Requirements:
 The start  (Actual Start) and completion (Actual Complete) of O&F (Action Name = Operational and Functional) are
 reported site specifically in WasteLAN.  This is a program measure.

 LONG-TERM RESPONSE ACTION (LTRA)
                                                                  |
 THE FOLLOWING DEFINITION IS UNDER REVIEW.
                                                                  i
 Definition:
 LTRAs are response actions undertaken for the purpose of restoring ground or surface water quality.  These actions
 require a continuous period of on-site activity before cleanup levels, specified in the ROD or Action Memorandum, are
 achieved.
                                                                  I  .        !
 The operation of treatment facilities or other measures to restore contaminated ground- or surface- water quality to a
 level that assures protection of human health and the environment for a period up to 10 years after completion of the
 operational and functional period (see definition of O&F) will  be considered part of RA. Monitored natural attenuation
 is considered a LTRA.
                                                                  I
 Activities required to maintain the effectiveness of such treatment or measures following the 10-year period shall be
 considered O&M. Ground- or surface- water measures initiated for the primary purpose of providing drinking water,
 not for the purpose of restoring ground- or surface- water shall not be considered LTRA.

 Definition of Accomplishment:
 LTRA (Action Name = Long Term Response or PRP LR) begins (Actual Start Date) when the O&F period is complete
 (See definition of O&F). LTRA is complete (Actual Complete Date) 10 years after it begins or when performance goals
 are reached as documented by EPA acceptance of the final RA Report.

 If the only action being conducted at the site or operable unit is Monitored Natural Attenuation, LTRA begins (Actual
 Start Date) when the ROD is signed. LTRA is complete (Actual Complete bate) when the Final Close Out Report
 is signed by the Region.
                                                                  I          i
July 1, 1998                                     B-22

-------
                                                                       OSWER Directive 9200.3-14-1E

If LTRA is the only remedy implemented at the site or operable unit (i.e., a RA was not performed), LTRA starts (Start
Date) when the ROD is signed. LTRA is complete (Actual Complete Date) 10 years after the ROD is signed or when
performance goals are reached as documented by EPA acceptance of the final RA Report.

Changes in Definition FY 98 - FY 99/00:
The completion of Monitored Natural Attenuation is defined as the date the Final Superfund Site Close-Out Report is
prepared.

Special Planning/Reporting Requirements:
LTRA is planned on a site-specific basis (Action Name = Long-term Response or PRP LR) in WasteLAN and is used
for resource allocation purposes only.  Funds for LTRA are issued site-specifically in the RA AOA. Funds for oversight
of the PRP LTRA are contained in the site characterization AOA.  LTRA may not be required at all sites. Where LTRA
is not being conducted, Regions should not enter the action into WasteLAN. See Long-Term Action Flow Chart at the
end of the Appendix (Exhibit B.2). This is a program measure.

COMPLETION OF A RESPONSE ACTION/ACTIVITY

THE FOLLOWING DEFINITIONS ARE UNDER REVIEW.

Definition:
Removal Actions - Removal actions are responses performed at NPL, non-NPL, or NPL caliber sites that eliminate or
reduce threats to public health or the environment from the release, or potential release, of hazardous substances. These
risk reduction activities can be conducted as emergency responses, time-critical or NTC removal actions.  This measure
tracks each removal completion at a site.

Remedial Actions - Remedial actions are cleanup responses intended to achieve the completion of more extensive site
remediation at NPL sites. This measure tracks each remedial action completion at a site.

Limited Remedial Action - Limited remedial actions result from RODs which select monitored natural attenuation to
restore the groundwater and/or institutional controls as the only response actions. Limited actions are distinguished
from No Action/No Further Action RODs, such as those  where groundwater monitoring is the only response activity
selected.   Regions should enter-monitored natural attenuation and institutional controls as remedial actions (Action
Name = Remedial Action or PRP RA) in WasteLAN.

Groundwater Monitoring (Post-ROD) - This measure tracks the completion of groundwater monitoring when the ROD
specifies  that groundwater monitoring is the only activity that will be taken at the site or groundwater monitoring is
the only  activity that will be implemented during an operable unit groundwater cleanup. This measure tracks each
groundwater monitoring (post-ROD) completion at a site.

Removal action, remedial action, limited remedial action and groundwater monitoring (post ROD) completions will
be tracked separately but accomplishments will be reported on a combined basis.

Definition of Accomplishment:
Removal Actions
•    A Fund-financed removal is considered complete when the actions specified in the Action Memorandum are met,
     OR when a ROD is signed which encompasses the actions specified in the Action Memorandum, (the ROD actual
     complete date should be the same as the Removal actual complete date) OR when the contractor has demobilized
     and left the site (as documented in the POLREP) and recorded as the removal (Action Name = Removal Action)
     actual completion date (Actual Complete) in WasteLAN.

•    A PRP-financed  removal  performed by the PRP under  the terms of a Federal enforcement instrument, is
     considered complete when the Region has certified that the PRPs have fully met the terms of an AOC, UAO, CD,


                                                B-23                                      July 1, 1998

-------
OSWER Directive 9200.3-14-IE

      or judgment and EITHER have completed the actions specified in the Action Memorandum (as documented in
      the POLREP) and recorded as the removal (Action Name = PRP Removal) actual completion date (Actual
      Complete) in WasteLAN OR a ROD (Action Name = Record of Decision) is signed which encompasses the
      actions specified in the Action Memorandum (the ROD actual complete date should be the same as the PRP
      Removal actual complete date).

 •    A PRP-financed removal performed by the PRPs under the terms of a State enforcement document is considered
      complete when the State has certified the PRPs have fully met the terms of the instrument AND EITHER have
      completed the actions specified in the Action Memorandum (as documented in the POLREP) and recorded as the
      removal (Action Name = PRP Removal) actual completion date (Actual Complete) in WasteLAN OR a ROD
      (Action Name =  Record of Decision)  is signed which encompasses the actions specified  in the  Action
      Memorandum (the ROD actual complete date should be the same as the PRP Removal actual complete date).
                                                                      !
                                                                      I
 •    A PRP-financed removal performed voluntarily by the PRPs without an enforcement instrument is considered
      complete when the actions specified in the Action Memorandum are met, OR when a ROD is signed  which
      encompasses the actions specified in the Action Memorandum, (the ROD actual complete date should be the same
      as the PRP Removal actual complete date) OR when  the contractor has  demobilized and left the site (as
      documented in the POLREP) and recorded as the removal  (Action Name = PRP Removal) actual completion date
      (Actual Complete) in WasteLAN. [This definition is under review]

 In order to receive credit for a removal completion an endangerment assessment must be performed. This endangerment
 assessment may be documented in an Action Memo, Removal Action Decision Document or enforcement instrument.
 Regions must identify which of these actions contain the endangerment assessment and their actual completion date
 (Actual Complete) into WasteLAN.

 For either Fund- or PRP-financed removals, an action qualifier (Qualifier) must be recorded to identify whether the
 action resulted in the site being " Cleaned Up" or " Stabilized."
                                                                      i
 Action qualifiers are defined as follows:

   -  Cleaned Up: All threats have been addressed as defined in the Action Memo and the Region determines that it
      has addressed all  threats posed by the site (will not be returning  for subsequent response activity).  Also, all
      removal obligations and related work have been completed.

   -  Stabilized:  All threats identified in the Action Memo have been addressed and the Region may take additional
      removal actions as new threats are identified/investigatory information is^available. Example: Site is fenced to
      preclude entry/exit and drums are segregated  and overpacked to prevent  a release/contamination.  Site is
      stabilized.

 Exceptions:
 Temporary demobilization and temporary storage on-site are not considered completions, unless temporary storage
 is the only action specified in  the Action Memorandum to mitigate threats to public health, welfare, and the
 environment. Likewise, temporary off-site storage of hazardous substances at a Treatment, Storage, and Disposal (TSD)
 facility other than the facility of ultimate disposal is a continuation of the action, not a completion, unless temporary
 off-site storage at a TSD is the only action specified in the Action Memorandum. In addition, a removal would not be
 considered complete if:

 •    The Action  Memorandum requires the EPA contractor to  monitor the hazardous substances stored on-site or
      additional contractor expenditures are anticipated; or

 •    Hazardous substances are being stored at an off-site facility, other than the ultimate TSD facility required in the
      Action Memorandum.

 A removal would be considered complete if:

July 1, 1998                                      B-24

-------
                                                                          OSWER Directive 9200.3-14-IE

•   The scope of work for the action does not specify final off-site disposal of hazardous substances; the substances
    have  been stabilized and are stored  on-site due  to circumstances such  as  the  unavailability of a final
    treatment/disposal remedy; and no additional Comprehensive Environmental Response, Compensation, and
    Liability Act (CERCLA) removal authority funds are anticipated to be expended on this action. In this instance,
    no CERCLA removal authority funds will be expended for remedial-term site O&M. Any remedial-term site O&M
    (greater than 6 months) should be performed by the PRP or another agency (e.g., the State); or

•   Hazardous substances are being stored off-site at the location of final disposal, and no additional contractor
    expenditures are anticipated for this action.

Remedial Action - (Fund- or PRP-financed)

These actions are considered complete for each OU when the designated Regional  official (Branch Chief or above)
signs a letter accepting the RA Report. The date of the acceptance of the RA Report must be entered into WasteLAN
as the RA (Action Name = Remedial Action or PRP RA) actual completion date (Actual Complete). The date the RA
Report is accepted varies depending on the remedy that was implemented. The following table provides example RAs
and indicates when the RA Report would be prepared.
Completion of RAor Removal Action - '
Example RAs
Excavation and off-site disposal of contamination
Landfill caps or other remedies where Long-Term
Response Action (LTRA) is not required
Groundwater pump and treat or other remedies where
LTRA is required
RA Complete
After the final inspection
After physical construction is complete and the
remedy is Operational and Functional (O&F) (see
definition of O&F).
When the LTRA performance goals/cleanup standards
are met. The timeframe for these actions may extend
beyond the LTRA 10-year period and into the
Operation and Maintenance (O&M) phase before
cleanup goals are met and the final RA Report is
accepted by EPA. An interim RA Report should be
prepared when the construction is complete.
                                                B-25
                                                                                           July 1, 1998

-------
OSWER Directive 9200.3-14-1E

 Limited Remedial Actions (Fund- or PRP-financed)

 The following table shows the definition of accomplishment dates:
Limited Remedial Action 4 * ..'-,',
Type of Action/Activity
Institutional Controls
Monitored Natural Attenuation to restore the
groundwater
Completion Definition
The institutional controls specified in the ROD are in
place as documented in the RA Report.
Groundwater cleanup goals are met through
monitored natural attenuation as documented in the
RA Report.
 Groundwater Monitoring (as the only activity taken at the site or groundwater operable unit)
 Groundwater monitoring [Action Name = Grndwtr Monitor (Post-ROD)] completion is defined as the date (Actual
 Complete) EPA determines that groundwater monitoring is no longer necessary.  This determination may by included
 in the Final Superfund Close-Out Report, five-year review report, or memorandum signed by the appropriate Regional
 official.

 Changes in Definition FY 98 - FY 99/00:
  Expanded the definition for PRP-financed under State enforcement. The RA Report is prepared after the remedy is
 O&F at RAs with landfill caps or other remedies where LTRA is not required. Limited Remedial Actions are complete
 when the institutional controls are in place or groundwater cleanup goals have been met through monitored natural
 attenuation.

 Special Planning/Reporting Requirements:
 Removal action, remedial action, limited remedial action and groundwater monitoring (post ROD) completions
 will be tracked separately but accomplishments will be reported on a combined basis. For removals, an action
 Qualifier must be recorded to identify whether the removal resulted in the site being " Cleaned Up" or " Stabilized."
 See Long-Term Action Flow Chart at the end of this Appendix (Exhibit B.2). This is a GPRA measure.
 NPL SITE CONSTRUCTION COMPLETIONS

 Definition:
 Construction at a NPL site is considered complete when physical construction is complete for the entire site as a result
 of one or several removal or remedial actions; and a Preliminary or Final Close Out Report has been signed by the
 Region and recorded at HQ.

 Sites that receive credit under this measure will have no further response actions, other than the ongoing "long-
 term response action" (LTRA) component of the cleanup actions being performed. Regions receive credit for
 construction completion only once per site.

 Accomplishments under this measure will count toward the goal of 900 site construction completions by the end of the
 year 2001.
                                                                 I
 Definition of Accomplishment:
 The following tables have been provided to more clearly depict coding and accomplishment requirements.
July 1, 1998
B-26

-------
                                                                       OSWER Directive 9200.3-14-IE
                              .,  NPL Site Construction ConSplettohC
                              IT*  ' J Through Remedial Actions
Definition of Accomplishment
    Construction activities at all
    OUs are complete; or

    Institutional controls
    specified in the final Limited
    Remedial Action ROD are in
    place

            AND

    A Preliminary Site Close-Out
    Report (PCOR)* has been
    prepared and signed by the
    designated Regional official;
    or

    A Final Site Close-Out
    Report has been prepared
    and signed by the designated
    Regional official;
AND
    HQ has received appropriate
    documentation of
    construction completion**
Actual Completion Date
Date  the  designated  Regional
official signs the Preliminary or
Final  Superfund Site Close-Out
Report
Coding Requirements
Region:
The completion date of the report
must be entered into WasteLAN as
the actual completion date (Actual
Complete) of the Preliminary
Superfund Site Close-Out Report
[Action Name = Remedial Action or
PRP RA and SubAction Name =
Prelim Close-Out Rep Prepared], or
the actual completion date (Actual
Complete) of the Final Superfund
Site Close-Out Report [Action Name
= Remedial Action or PRP RA and
SubAction Name - Close Out
Report]

               AND

HQ:
HQ enters the Construction
Completion indicator and
construction completion date into
WasteLAN.**
*   A PCOR is not required if the Region immediately prepares a Final Superfund Site Close-Out Report.  Refer
    to "Close-Out Procedures for NPL Sites" for additional information.

**  Documents for construction completions, received by Headquarters after the fiscal year close-out date, will be
   dated effective the first work day of the new fiscal year.
                                               B-27
                                                        July 1, 1998

-------
OSWER Directive 9200.3-14-IE
                             NPL Site Consffiiction Completion as a result of
                               No Action/Groundwater Monitoring ROPs
  Definition of Accomplishment
  ROD is signed for the final
  Operable Unit (OU) with no
  previous RAs stating that no
  physical construction is required
  or the only activity performed is
  groundwater monitoring and a
  Preliminary* or Final Superfund
  Site Close-Out Report is prepared
  and signed by the designated
  Regional official.

               AND

  HQ has received appropriate
  documentation of construction
  completion**
Actual Completion Date
Date the designated Regional
official signs the Preliminary
or Final Superfund Site
Close-Out Report.
Coding Requirements
Region:
Regions enter the following into
WasteLAN:  The completion date of
the close-out report is the actual
completion date (Actual Complete) of
the PCOR (Action Name = Record of
Decision and SubAction Name =
Prelim Close-Out Report Prepared) or
the actual completion date (Actual
Complete) of the Final Superfund Site
Close-Out Report (Action Name =
Record of Decision and SubAction
Name = Close Out Report).

               AND

HQ:
HQ enters the Construction Completion
indicator and construction completion
date into WasteLAN.**
  NOTE: The Region must prepare a Preliminary or Final Superfund Site Close-Out Report.

  *   A PCOR is not required if the Region immediately prepares a Final Superfund Site Close-Out Report. Refer
      to "Close-Out Procedures for NPL Sites" for additional information.

  **  Documents for construction completions, received by Headquarters after the fiscal year close-out date, will
      be dated effective the first work day of the new fiscal year.
July 1, 1998
             B-28

-------
                                                                       OSWER Directive 9200.3-14-1E
                           NPL Site Construction Completion as,a result of <-
                         No'FurtherAction/Groundwater MonitorinsfRODs  *
Definition of Accomplishment
ROD is signed for the final OU
stating that all physical
construction is complete or the
only activity performed is
groundwater monitoring and a
Preliminary* or Final Superfund
Site Close-Out Report is prepared
and signed by the designated
Regional official.

             AND

HQ has received appropriate
documentation of construction
completion**
Actual Completion Date
Date the designated Regional
official signs the Preliminary or
Final Superfund Site Close-Out
Report.
 Coding Requirements
Region:
The completion date of the close-
out report is the actual completion
date (Actual Complete) of the
PCOR (Action Name = Record of
Decision and SubAction Name =
Prelim Close-Out Report
Prepared) or the actual completion
date (Actual Complete) of the
Final Superfund Site Close-Out
Report (Action Name = Record of
Decision and SubAction Name =
Close Out Report).

             AND

HQ:
HQ enters the Construction
Completion indicator and
construction completion date into
WasteLAN.**
NOTE: The region must prepare a Preliminary or Final Superfund Site Close-Out Report.

*   A PCOR is not required if the Region immediately prepares a Final Superfund Site Close-Out Report. Refer
    to "Close-Out Procedures for NPL Sites" for additional information.

**  Documents for construction completions, received by Headquarters after the fiscal year close-out date, will
    be dated effective the first work day of the new fiscal year..
                                              B-29
                                                                                        July 1, 1998

-------
OSWER Directive 9200.3-14-1E
                               NPL Site Construction Completion thrwigE?
                        Limited Remedial Actions - Monitored Natural Attenuation
  Definition of Accomplishment
  Groundwater cleanup goals are
  met through monitored natural
  attenuation and a Preliminary* or
  Final Superfund Site Close-Out
  Report is prepared and signed by
  the designated Regional official.

               AND

  HQ has received appropriate
  documentation of construction
  completion**
Actual Completion Date
Date the designated Regional
official signs the Preliminary or
Final Superfund Site Close-Out
Report.
Coding Requirements
Region:
The completion date of the close-
out report is the actual completion
date (Actual Complete) of the
PCOR (Action Name = Remedial
Action or PRP RAand SubAction
Name = Prelim Close-Out Report
Prepared) or the actual completion
date (Actual Complete) of the
Final Superfund Site Close-Out
Report (Action Name — Remedial
Action or PRP RA and SubAction
Name = Close Out Report).

             AND

HQ:
HQ enters the Construction
Completion indicator and
construction completion date into
WasteLAN.**
   NOTE: The Region must prepare a Preliminary or Final Superfund Site Close-Out Report.

   *  A PCOR is not required if the Region immediately prepares a Final Superfund Site Close-Out Report. Refer
      to "Close-Out Procedures for NPL Sites" for additional information.

   ** Documents for construction completions, received by Headquarters after the fiscal year close-out date, will
      be dated effective the first work day of the new fiscal year.
July 1, 1998
             B-30

-------
                                                                      OSWER Directive 9200.3-14-1E
                             NPL Site Construction Completion through
                                         Removal Action     "'   ',    '
Definition of
Accomplishment
Fund-Financed:
Contractor demobilized
(recorded in POLREP)

PRP-Financed:
Region certifies that PRPs or
their contractor have
completed the removal
specified in the Action
Memorandum and fully met
the terms of the AO,> CD or
judgment

Both Fund- and PRP-
Financed:
A Preliminary * or Final
Superfund Site Close-Out
Report has been prepared and
signed by the designated
Regional official
           AND

HQ has received appropriate
documentation of
construction completion**
Actual Completion Date
Region:
Date the designated
Regional official  signs the
Preliminary or Final
Superfund Site Close-Out
Report
Coding Requirements
Region:
The  Region  enters  the  following  into
WasteLAN:
The removal (Action Name = Removal
Action or PRP Removal) actual completion
date (Actual Complete) as reported in the
POLREP; and the Qualifier that indicates
that the site is Cleaned Up; and the actual
completion date (Actual Complete) of the
PCOR (Action Name = Removal or PRP
Removal and SubAction Name = Prelim
Close-Out Report Prepared) or the actual
completion date (Actual Complete) of the
Final Superfund Site Close-Out Report
(Action Name = Removal Action or PRP
Removal and SubAction Name = Close Out
Report);

                 AND
HQ:
HQ enters the Construction Completion
indicator and construction completion date
into WasteLAN.**
NOTE: The Region must prepare a Preliminary or Final Superfund Site Close-Out Report.

*       A PCOR is not required if the Region immediately prepares a Final Superfund Site Close-Out Report.
        Refer to "Close-Out Procedures for NPL Sites" for additional information.

**      Documents for construction completions, received by Headquarters after the fiscal year close-out date,
        will be dated effective the first work day of the new fiscal year.
                                             B-31
                                                                                       July 1, 1998

-------
OSWER Directive 9200.3-14-IE

 Changes in Definition FY 98 - FY 99/00:
 Added a NOTE emphasizing that the Region must prepare a Preliminary or Final Superfund Site Close Out Report to
 receive credit for a construction completion.

 Special Planning/Reporting Requirements:
 Regions will not receive credit for a NPL Site Construction Completion until the actual completion date of the
 Preliminary or Final Superfund Site Close-Out Report is entered  into  WasteLAN and  the necessary
 documentation is submitted to HQ, and HQ enters the construction completion indicator into WasteLAN.
 Accomplishments under this measure will count toward the goal of 900 NPL Construction Completions by the end of
 the year 2001. Regions identify sites to meet the goal prior to the start of the FY.  There is only one NPL construction
 completion at a site. Regions may receive credit under this measure and the NPL Site Completion measure as a result
 of the same remedial action or removal action. This is a GPRA target/annual performance goal.

 OPERATION AND MAINTENANCE (O&M)

 THE FOLLOWING DEFINITION IS UNDER REVIEW.

 Definition:
 O&M are the  activities required to maintain the effectiveness or the integrity of the remedy, and, in the case of
 measures to restore ground- or surface- waters, continued operation of such measures beyond the LTRA period until
 remediation levels  are achieved. Except for ground- or surface- water restoration actions covered under Section
 300.435(0(4) of the NCP, O&M measures are initiated after the remedy has,achieved the remedial action objectives
 and remediation goals in the ROD, and is determined to be O&F (see definition of O&F).

 Depending on the remedy that was implemented at the site/OU, O&M may not be required, may only be required for
 a defined timeframe, or may be required to be performed indefinitely. Examples of sites/OUs where O&M may have
 an indefinite period of performance include sites where waste is contained on-site and the integrity of the cap must be
 maintained; or sites where groundwater monitoring is either the only activity, a component of the selected remedy, or
 is required after completion of LTRA; or sites where institutional controls must be maintained.  In  some instances,
 O&M may be complete when the ground- or surface-  water restoration goals are met. The State or PRP is totally
 responsible for O&M.

 Definition of Accomplishment:
 O&M [Action Name = Operations and Maintenance]  starts when the State or PRPs assume responsibility for all
 activities necessary to operate and/or maintain the long-term effectiveness or integrity of the actions selected in the
 ROD.

 For OUs that do not require LTRA, O&M starts on the date (Actual Start) the designated Regional  official accepts
 the RA Report.  For OUs where LTRA is required, O&M (Action Name = Operation and Maintenance) begins when
 LTRA is complete [see Definition of Long-Term Response Action (LTRA)]. For OUs where institutional controls must
 be maintained, O&M starts when all controls required by the ROD are in place. Copies of the institutional controls must
  be placed in the Administrative Record.

  Where appropriate, the completion of O&M is defined as the date (Actual Complete) specified in the Cooperative
  Agreement  that provides funds for the RA,  Superfund State Contract (SSC), or CD signed by EPA, the PRPs and
  Federal judge.  If O&M must be conducted indefinitely, Regions should not enter an actual completion date.

  Changes  in Definition FY 98 - FY 99/00:
   None
 July 1, 1998                                      B-32

-------
                                                                        OSWER Directive 9200.3-14-IE

Special Planning/Reporting Requirements:
O&M is planned site-specifically (Action Name = Operation and Maintenance) in WasteLAN and is used for resource
allocation purposes only. Funds for oversight of O&M are contained in the site characterization AOA. If O&M is not
required, Regions should not enter the action into WasteLAN. Where O&M must be conducted indefinitely, Regions
should not enter a planned or actual completion date for the O&M action. See Long-Term Action Flow Chart at the
end of this Appendix (Exhibit B.2). This is a program measure.

NPL SITE COMPLETIONS

Definition:
An NPL site is completed when:

•   Performance goals are reached as  a result of one or several remedial actions, including LTRA. Performance goals
    may be met at the completion of the removal or RA, at the completion of LTRA, or at the completion of O&M,
    where O&M is necessary for completion of ground- or surface-water remediation post-LTRA; or

•   A determination is made that the  site is available for industrial, residential or recreation use; and/or

•   A Final Superfund Site Close Out Report has been signed by the Regional Administrator

Definition of Accomplishment:
The following tables have been provided to more clearly depict coding and accomplishment requirements:
                                               B-33                                      My 1, 1998

-------
OSWER Directive 9200.3-14-IE
NPL Site Completions
Through Remedial Action or Long Term Remedial Action
Definition of Accomplishment
• Construction activities at all
OUs are complete; and
• Performance goals at all OUs
have been met, including the
groundwater restoration goals
associated with monitored
natural attenuation or ground-
or surface-water restoration
goals associated with LTRA
and, if necessary, O&M; and
• Institutional controls
specified in ROD(s) are in
place; and
• A Final Superfund Site Close-
Out Report has been signed
by the Regional
Administrator.
Actual Completion Date
Date the Regional Administrator
signs the Final Superfund Site
Close-Out Report.




CERCLIS Data Entry
Requirements
The completion date (Actual
Complete) of the Final Superfund
Site Close-Out Report [Action
Name — Remedial Action or PRP
RA or Long-Term Response or
PRP LR and SubAction Name =
Close Out Report]




NOTE: The Final Superfund Site Close-Out Report documents that the cleanup goals have been achieved
and no further response actions are necessary, including LTRA and O&M activities to restore
ground- or surface-water quality.
 July 1, 1998
B-34

-------
                                                                         OSWER Directive 9200.3-14-1E
                                  /,  •'  \NPESite Completions*   ,„ :   '.
                                a Result of the Site Being Available for Reuse
   Definition of Accomplishment
       Construction activities at all
       OUs are complete; and

      . A Preliminary Superfund Site
       Close-Out Report has been
       prepared and signed by the
       designated Regional official;
       and

       The Region has determined
       that the site is available for
       reuse.
Actual Completion Date
Memo to the file or other
document that provides the
determination that the site may be
used for industrial, residential or
recreational purposes.
CERCLIS Data Entry
Requirements
The actual completion date
(Actual Complete) of the
determination that the site is
available for reuse (Action Name
= Land Reuse Determination)
 Changes in Definition FY 98-FY  99/00:
 Combined all Remedial Actions including Limited Remedial Actions into one table.  Deleted RODs that documented
 Site Completion and No Action RODs.  Only Remedial Actions can be used to document an NPL Site Completion.

 Special Planning/Reporting Requirements:
 See Long-Term Action Flow Chart at the end of this Appendix (Exhibit B.2).  Regions may receive credit under this
 measure and the and NPL Site Construction Completion measure, as a result of the same remedial action..  There is
 only one site completion at a site. This is a GPRA measure.

 FIVE-YEAR REVIEWS

 Definition:
 Five-year reviews are intended to evaluate whether the response action implemented at a NPL site remains protective
 of public health and the environment, is functioning as designed,  and necessary operation and maintenance is being
 performed. Every five years, EPA will review any  site at which  a remedy, upon attainment of the ROD or Action
 Memorandum cleanup levels, will not allow unlimited use and unrestricted exposure.  Five-year reviews generally
 involve a site visit or documentation of conditions noted through ongoing presence at the site.

 EPA is responsible for conducting five-year reviews at all sites where required. Consistent with relevant settlement
 agreements, a lead agency may authorize PRPs to visit sites for five-year review purposes and to conduct studies and
 investigations for EPA. Five-year reviews are conducted on an OU  basis until the site reaches construction completion.
 After that time, five-year reviews are conducted on a site-wide basis.

 Definition of Accomplishment:
Five-Year Review Starts - Credit is given for a  five-year review start when:

•   Fund-financed (F-, TR-, S- or EP-lead actions) - EPA or the  State begins any of the tasks discussed in  the five-
    year review guidance, "Structure and Components of Five-Year Reviews," OSWER Directive 9355.7-02 (May
    23, 1991) or its first supplement, OSWER Directive 9355.7-02A (July 24, 1994). This action may be documented
    by a memo to the file or EPA approval of a workplan for the five-year review.
                                               B-35
                                                                                         July 1, 1998

-------
OSWER Directive 9200.3-14-1E

 •   PRP-financed (MR-, RP- or PS-lead actions) - EPA approves the five-year review workplan submitted by the
     PRPs under the terms of a settlement agreement.

 The actual start date (Actual Start) for the five-year review (Action Name = Five-Year Remedy Assessment) must be
 entered into WasteLAN.

 Five-Year Review Completions

 The five-year review is complete on the date the designated Regional Official signs the five year review report stating
 whether the remedy is, or is not, protective of human health and the environment. The actual completion date (Actual
 Complete) for the five-year review (Action Name = Five-Year Remedy Assessment) must be entered into WasteLAN.

 Changes in Definition FY 98 - FY 99/00:
 Five-year reviews are conducted on an OU basis until the site reaches construction completion.

 Special Planning/Reporting Requirements:
 Five-year review starts and completes must be planned and  reported site-specifically (Action Name = Five-Year
 Remedy Assessment) in WasteLAN. Funds are allocated in the RA AOA.  See Long-Term Action Flow Chart at the
 end of this Appendix (Exhibit B.2). This is a program measure.


 PARTIAL NPL DELETION

 Definition:
 EPA will consider partial deletion for portions of sites when no further response is appropriate for that portion of the
 site. Such portion may be a defined geographic unit of the site, perhaps as small as a residential unit, or may be a
 specific medium at the site (e.g., groundwater), depending on the nature or extent of the release(s).  The criteria for
 partial deletion are the same as for final deletion. Given State concurrence, EPA considers:

  •    Whether responsible or other parties have implemented all appropriate and required response actions;

  •    Whether all appropriate Fund-financed responses under CERCLA have been implemented and EPA has determined
      that no further cleanup by responsible parties is appropriate; or

  •    Whether the release of hazardous substances poses no significant threat to the public health, welfare, or the
      environment, thereby eliminating the need for remedial action.

  Partial deletion should only be used when the deletion does  not address the remaining release listed on the NPL.  If a
  deletion does cover the remaining release listed  on  the NPL, the action should be treated as a Final NPL Deletion,
  discussed below.

  Definition of Accomplishment:
  The partial NPL deletion process (Action Name  = Partial Deletion from NPL) starts (Actual Start) when a Notice of
  Intent to Partially Delete is published in the Federal Register for the specified portion of a site on the NPL.

  The partial NPL deletion process (Action Name = Partial Deletion from NPL) is complete (Actual Complete) when the
  Notice of Partial Deletion is published in the Federal Register for the specified portion of a site on the NPL.

  HQ will enter the Partial Deletion from the NPL Action and the actual start and completion dates into WasteLAN.

  Changes in Definition FY 98 - FY 99/00:
  HQ is responsible for entering partial deletion starts and completions into WasteLAN.


 July 1, 1998                                       B-36

-------
                                                                           OSWER Directive 9200.3-14-1E

  Special Planning/Reporting Requirements:
  Partial NPL deletions are tracked separately from final NPL deletions. Partial site NPL deletions will be entered by
  HQ if a portion, or portions of the release remain listed on the NPL following completion of the partial deletion When
  the Notice of Partial Deletion is published, HQ will change the NPL Status to "Partially Deleted from NPL".

  A site deletion (Action Name = Final Deletion from NPL) will be entered by HQ if the deletion activity addresses the
  remaining release listed on the NPL (either as a one-time deletion activity for the entire site as originally listed or as
  the last deletion activity associated with a site subject to previous partial deletions). This is a program measure'.

  FINAL NPL DELETION

  Definition:
  With State concurrence, EPA may delete sites from the NPL when it determines that no further response is appropriate
  under CERCLA. In making that determination, EPA considers:

  •   Whether responsible or other parties have implemented all appropriate and required response actions;

  •   Whether all appropriate Fund-financed responses under CERCLA have been implemented and EPA has determined
     that no further cleanup by responsible parties is appropriate; or

 •   Whether the release of hazardous substances poses no significant threat to the public health, welfare, or the
     environment, thereby eliminating the need for remedial action.

 EPA will  consider deleting the entire site or portions of sites from the NPL, as appropriate. EPA will consider partial
 deletion for portions of sites when no further response is appropriate for that portion of the site.  Such portions may be
 a defined geological unit of the site,  or may be a specific medium at the site.  If a decision does cover the remaining
 release listed  on the NPL, the action should be treated as a Final NPL Deletion. State concurrence will be required for
 any deletion.                                                                                   ^

 Definition of Accomplishment:
 The deletion process for the entire site [Action Name = Final Deletion from the NPL] starts (Actual Start) when a Notice
 of Intent to Delete is published in the Federal Register.

 The deletion process for the entire site [Action Name = Final Deletion from the NPL] is complete (Actual Complete)
 when the Notice of Deletion is published in the Federal Register.

 HQ will enter the Final Deletion from the NPL Action and the actual start and completion dates into WasteLAN.

 Changes in Definition FY 98  - FY 99/00:
 HQ is responsible for entering final deletion starts and completions into WasteLAN.

 Special Planning/Reporting Requirements:
An entire site deletion action (Action Name = Final Deletion from NPL) will be entered by HQ if the deletion activity
addresses  the  remaining release listed on the NPL (either as a one-time deletion event for the entire site as originally
hsted, or as the last deletion activity associated with a site subject to previous partial deletions).  When the Notice of
Deletion is published, HQ will change the NPL Status in CERCLIS to "Deleted from Final NPL." This is a program
mp.asnrp.                                                                                        r  a
                                                B-37                                       July 1, 1998

-------
OSWER Directive 9200.3-14-1E
                              t
 NON-NPL SITE COMPLETION

 Definition:
 A non-NPL site is complete as a result of a completed removal action that has mitigated all threats and cleaned up the
 site and no further site assessment work or remedial actions are required or planned.

 Definition of Accomplishment:
 Fund-financed (F-, TR-, S- or CG-lead actions) - The actions specified in the Action Memorandum are met, OR the
 contractor has demobilized and left the site (as documented in the POLREP) and recorded the removal (Action Name
 = Removal Action) actual completion date (Actual Complete) in WasteLAN.

 PRP-financed under Federal enforcement (MR- and RP- lead actions) - The Region has certified that the PRPs have
 fully met the terms of an AOC, UAO, CD, or judgment and have completed the actions specified in the Action
 Memorandum (as documented in the POLREP) and recorded the removal (Action Name = PRP Removal) actual
 completion date (Actual Complete) in WasteLAN.

 PRP-Jinanced under State enforcement (PS-lead actions) - The state has certified the PRPs have fully met the terms
 of the instrument and have completed the actions specified in the Action Memorandum (as documented in the POLREP)
 and recorded the removal (Action Name = PRP Removal) actual completion date (Actual Complete) in WasteLAN.

 PRP-fmanced (RP-lead) voluntary actions (no enforcement instrument exists) - The actions specified in the Action
 Memorandum are met OR the contractor has demobilized and left the site (as documented in the POLREP) and
 recorded the removal (Action Name = PRP Removal) actual completion date (Actual Complete) in WasteLAN.
 [This definition is under review.]

 For either Fund- or PRP-fmanced removals, an action qualifier (Qualifier) of "Cleaned Up" must be recorded to
 identify all threats have been addressed as defined in the Action Memo and the Region has determined that it has
 addressed all threats posed by the site (will not be returning for subsequent response  activity). Also, all removal
 obligations and  related work have been completed.

  Under a Non-NPL Site Completion, the latest site assessment action (PA, SI, ESI or ESI/RI) must have a qualifier of
  "No further remedial action planned (N)" or "Referred to Removal (W)". The completion date of the site assessment
  action should be the same as or after the removal completion date.

  A Non-NPL Site Completion requires a memo to the site file signed by both the removal and site assessment programs.

  Changes in Definition FY 98 - FY 99/00:
  This is a new activity in the FY 99/00 SPIM.
                                                                  i
  Special Planning/Reporting Requirements:
  The removal must have a qualifier of "Cleaned Up" (C). Under a Non-NPL Site Completion, the latest site assessment
  action (PA, SI, ESI or ESI/RI) must have a qualifier of  "No further remedial action planned (N)" or "Referred  to
  Removal (W)".' The completion date of the site assessment action should be the same as or after the removal completion
  date. This is a GPRA measure.

   INDICATOR A • POPULATIONS PROTECTED


   Definition:
   This measure tracks the environmental progress achieved at NPL, NPL-caliber and non-NPL sites through the
   completion of removal actions taken to prevent human exposure to contaminated materials. The following will  be
   reported under this measure:
                                                                  !          '

 July 1, 1998                                     B-38

-------
                                                                           OSWER Directive 9200.3-14-IE
     Total number of sites where a removal was conducted, and
•   The number of people and receptors protected during removals that provide for:
         Implementation of site security measure;
         Relocation of affected populations; or
         Provision of an alternate water supply.

Definition of Accomplishment:
A removal action (Action Name = Removal or PRP Removal) is complete (Actual Completion) when the actions
specified in the Action Memo are met or when a ROD is signed which encompasses the actions specified in the Action
Memo (see Completion of Response Actions).  The response actions taken, and number of people and receptors
protected, should be documented in the file, in a POLREP or in the OSC's after action report.

A remedial action (Action Name = Remedial Action or PRP.RA) is complete (Actual Completion) for each OU when
the designated Regional official (Branch Chief or above) signs a letter accepting the RA Report.

The following table identifies the medium-specific information that must be entered into WasteLAN for each category
of protection provided:
 Site Security Measures
 Implemented
 Media Type  (groundwater,  soil,
 sediment, surface water, air, liquid
 waste, solid waste, leachate, debris,
 residuals, or other)
 Media Name
 Site Security/Institutional Control
 Response Actions Selected
 [Access Restriction, Access
 Restriction - Guards, Access
 Restriction - Fencing, Deed
 Restriction, Drilling Restriction,
 Fishing Restriction, Institutional
 Controls (N.O.S.), Land Use
 Restrictions, Swimming
 Restrictions and Water Supply
 Use Restrictions]
The predominant receptor type
protected (Receptors =
Recreational, Residential,
Industrial, Agricultural
(Residential), Agricultural
(Industrial), Other, Not
Documented, Commercial,
Trespassing, Hospital, or School)
Population Protected (number)
 Population" Relocated
 Media Type (groundwater, soil,
 sediment, surface water, air, liquid
 waste, solid waste, leachate, debris,
 residuals, or other)
                                    Media Name
 Population Relocated Response
 Actions Selected [Population
 Relocation - Temporary,
 Population -  Relocation Returned,
 Population Relocation -
 Permanent, Population  Relocation
 (N.O.S.)]
The predominant receptor type
protected (Receptors =
Recreational, Residential,
Industrial, Agricultural
(Residential), Agricultural
(Industrial), Other, Not
Documented, Commercial,
Trespassing, Hospital, or School)
Population .Protected (number)
 Alternate, Water-supply Provided
 Media Type (groundwater, surface
 water)
                                                                       Media Name
 Alternative Water Supply
 Response Actions Selected
 [Alternative Drinking Water
 (N.O.S.), Alternative Drinking
 Water - Temporary Replacement,
 Alternative Drinking Water -
 Supply Reinstated, Alternative
. Drinking Water - Permanent
 Replacement]
 The predominant receptor type
 protected (Receptors =
 Recreational, Residential,
 Industrial, Agricultural
 (Residential), Agricultural
 (Industrial), Other, Not
 Documented, Commercial,
 Trespassing, Hospital, or School)
                                                                      Population Protected (number)
                                                B-39
                                                                                           July 1, 1998

-------
OSWER Directive 9200.3-14-1E

 Changes in Definition FY 98 - FY  99/00:
 None

 Special Planning/Reporting Requirements:
 See Definition of Accomplishment. The WasteLAN data may be entered using the Smart Screen for the Action Memo.
  This is a GPRA measure.

 INDICATOR B • PROGRESS THROUGH ENVIRONMENTAL INDICATORS
 (ACHIEVING PERMANENT CLEANUP GOALS)

 Definition:
 This measure tracks environmental progress at NPL, NPL-caliber and non-NPL sites by categorizing the cleanup goals
 attained for each medium addressed by a removal action or remedial action. Cleanup goals are established in the ROD
 or Action Memo.

 Goal attainments categories are defined as follows:

 •    Fully achieved - All goals established in the ROD or Action Memo for a specific medium have been achieved
      through one or more cleanup actions and no further cleanup activities are anticipated for that medium. Sites that
      have achieved this goal for a specific medium may be candidates for partial NPL deletion (see Partial NPL Deletion
      definition);

 •    Partially achieved - One or more cleanup actions that address a specific medium have been completed and one or
      more of the cleanup goals established in the ROD or Action Memo for a specific medium have be achieved;

 •    Underway - At least one cleanup action to address a  specific  medium has been initiated; or

 •    Media affected - A medium has been affected at a site, but cleanup actions have not been initiated.

 Definition of Accomplishment:
 Fully Achieved and Partially Achieved - A removal action or a remedial action has been completed as defined in
 "Completion of Response Actions." Regions must document in the RA Report, final POLREP or in a memo to the
 file the cleanup goals that have been achieved for a specific medium.

 Underway - A removal or remedial action has started as defined in "Start of Response Actions/Activities."
 Regions must document in a POLREP, memo to the file or other documentation that work has begun on-site to
 address a specific medium.

 Media Affected - A ROD that identifies permanent cleanup goals for a specific medium has been signed (as defined
  in Decision Documents Signed) or a removal was completed as defined in  "Completion of Response Actions" that
  partially cleaned up or stabilized a medium or site. Regions must document in the ROD, POLREP or memo to the
  file the specific medium that is affected.
                                                                j
  The following information must be entered into WasteLAN for each medium addressed by a planned, ongoing or
  completed response action:

  •   Media Name;

  •   Media Type (groundwater, soil, sediment, surface water, air, liquid waste, solid  waste, leachate, debris, residuals,
      or other);

  •   Goal Attainment (fully achieved, partially achieved, cleanup underway, or medium affected);

 July 1, 1998                                      B-40

-------
                                                                      OSWER Directive 9200.3-14-IE


 •   Goal Description, including an identification of whether the goal is based on human health standards, ecological
    standards or both; and

 •   Threat Addressed (direct contact threat was addressed, direct contact threat remains, or direct contact threat does
    not exist).

 Changes in Definition FY 98 - FY 99/00:
 None


 Special Planning and Reporting Requirements:
 See Definition of Accomplishment. The El data are entered into WasteLAN by selecting Views, Remedy Selection
 or Removal, and Site Characterization. On the Site Characterization screen, select Options and Add/Edit El Data.
 This is a GPRA measure.

 INDICATOR C • TECHNOLOGIES  USED AND VOLUMES HANDLED AT NPL AND
 NON-NPL SITES

 Definition:
 This measure tracks the technologies selected and the volume of hazardous waste handled during each removal
 action or remedial action conducted at a NPL or non-NPL site.

 Definition of Accomplishment:
 A removal action or a remedial action has been completed as defined in "Completion of a Response
 Action/Activity."  Regions must document in the RA Report or final POLREP the technologies that were
 implemented and the volume of hazardous waste handled.

 The following information must be entered into WasteLAN for each medium addressed by  the completed response
 action:

 •   Media Name;

 •   Media Type (groundwater, soil, sediment, surface water, air, liquid waste, solid waste, leachate, debris, residuals,
    or other);

 •   Response Actions Selected; and

 •   Volume High/Volume Low and Units.

 Changes in Definition FY 98 -  FY 99/00:
 None

Special Planning and Reporting Requirements:
See Definition of Accomplishment.  The technologies selected and the volume of hazardous materials addressed through
a removal  action can be entered into  WasteLAN through  the  Removal Screen or the El screen (Views, Remedy
Selection or Removal, Site Characterization, Options, Add/Edit El). The technologies selected  and the volume of
hazardous materials addressed through a removal action or RA can be entered into WasteLAN through the ROD Screen
or El screen (Views, Remedy Selection, Site Characterization, Options, Add/Edit El).  This is a GPRA measure.
                                              B-41                                     My 1, 1998

-------
 OSWER Directive 9200.3-14-1E


                           THESE FLOWCHARTS ARE UNDER REVIEW
  CO
  H
  n
  u
HO
*•<

WS
  PS
  w
  H
  O
           o

           X
           •Si
           q


           «3
            Q
            U
/



83
£


--a tJ
CJ O
"J3 4?
^0 p^
1?
S°
two
i-J-3
sl
                                                    fc.
                                                   •Mk
                                                    s
                                                    K
                                                    Q
                                                   s
  July 1, 1998
B-42

-------
                                                  EXHIBIT B.2

                                LONG TERM ACTION FLOWCHARTS - continued
      Ms with LIRA
                                                                   O&M
w
-U
OJ
RA
Start
i

->
Contract
Award

->
RA Mobilization/
On-Site Construction
Start (ACT-5)
No
                              NPL Site Construction Completion/

                                Preliminary Close-Out Report
                                      (ACT-7)	
LIRA
i
t
' V >

RA Completion/
RA Report
(ACT-6)
NPL Deletion

YV,

Archive Site
fromCERCLIS

                                                                                                            r
                                                                                                            o
                                                                                                            a
                                                                                                                m
                                                                                                                o
                                                                                                                to
                                                                                                                O
                                                                                                                p
                                                                                                                Lo
                                                                                                               ffl

-------
OSWER Directive 9200.3-14-1E
                                    EXHIBIT B.3(l of 7)
                       RESPONSE ACTION PLANNING REQUIREMENTS
Planning Requirements
GPRA Target/Annual Perf. Goal
GPRA or Program Measure?
Planned Site-Specifically
Planned/Reported on Operable Unit
or Whole Site Basis?
Reported Site-Specifically or in Non-
site Specific Portion of CERCLIS?
AOA Category, if Fund-Financed?
AOA Category for Oversight?
Basis for AOA?
Engineering
Eval/Cost
Analysis „
-
Program
Measure
Yes
Whole Site
Site-Specific
Site
Characterization
Site
Characterization
Site-Specific
Plans
Support
Agency
Assistance ,
-
Program
Measure
Not Required
Whole Site
Not Required
Site
Characterization
Enforcement
Federal Facility
Site- or Non-
specific Plans
„' / Technical
• Assistance
-
Program
Measure
Not Required
Operable Unit
Not Required
Site
Characterization
Enforcement
Site- or Non-
Specific Plans
' Remedial
Investigation
Starts
-
Program
Measure
Yes
Operable Unit
Site Specific
Site
Characterization
Site
Characterization
Site-Specific
Plans
                                    EXHIBIT! B.3 (2 of 7)
                       RESPONSE ACTION PLANNING REQUIREMENTS
Planning Requirements
GPRA Target/Annual Perf. Goal
GPRA or Program Measure?
Planned Site-Specifically?
Planned/Reported on Operable Unit or
Whole Site Basis?
Reported Site-Specifically or in Non-
site Specific Portion of CERCLIS?
AOA Category, if Fund-Financed?
AOA Category for Oversight?
Basis for AOA?
Feasibility Study'
Starts
-
Program Measure
Yes
Operable Unit
Site-Specific
Site
Characterization
Site
Characterization
Site-Specific Plans
, Combined RI/FS
Starts
-
Program Measure
Yes
Operable Unit
Site-Specific
Site Characterization
Site Characterization
Site-Specific Plans
Treatability
Studies
-
Program Measure
Not Required
Operable Unit
Not Required
N/A
N/A
N/A
July 1, 1998
                NOTE:  Accomplishments are pulled from WasteLAN on a semi-annual basis.
B-44

-------
                                                OSWER Directive 9200.3-14-1E
                     EXHIBIT B.3 (3 of 7)
        RESPONSE ACTION PLANNING REQUIREMENTS
v ,*••„
'Planning Requirements * ^
, ' *
GPRA Target/Annual
Performance Goal
GPRA. or Program Measure?
Planned Site-Specifically?
Planned/Reported on
Operable Unit or Whole Site
Basis?
Reported Site-Specifically or
in Non-site Specific Portion
of WasteLAN?
AOA Category, if Fund-
Financed?
AOA Category for
Oversight?
Basis for AOA?
', ~ Sta|t of Public ,
Comment:Period ~
v' s
-
Program Measure
Yes
Operable Unit
Site-Specific
N/A
N/A
N/A
- RI/FSDuration '
**^. / f^f ?
-
GPRA Measure
No
Operable Unit
Site-Specific
N/A
N/A
N/A
Decision
Document
•Signed
-
Program Measure
Yes
Operable Unit
Site-Specific
N/A
N/A
N/A
ROD Amends.
andESDs •
-
Program
Measure
No
Operable Unit
Site-Specific
N/A
N/A
N/A
                     EXHIBIT B.3 (4 of 7)
       RESPONSE ACTION PLANNING REQUIREMENTS
/ * ~
Planning Requirements
GPRA Target/Annual
Performance Goal
GPRA or Program Measure?
Planned Site-Specifically?
Planned/Reported on
Operable Unit or Whole Site
Basis?
Reported Site-Specifically or
in Non-site Specific Portion of
WasteLAN?
AOA Category, if Fund-
Financed?
AOA Category for Oversight?
Basis for AOA?
Pre-Design
"Assistance-^
-
Program
Measure
Not Required
Operable Unit
Not Required
N/A
N/A
N/A
\ s
'~ RD'Starf^
*; ' '-
-
Program Measure
Yes
Operable Unit
Site-Specific
Site
Characterization
Site
Characterization
Site-Specific
Plans
s
RD Completion
-
Program
Measure
Yes
Operable Unit
Site Specific
N/A
N/A
N/A
RA Start *,
GPRA Target
-
Yes
Operable Unit
Site Specific
Remedial
Action
Site
Characterization
Site-Specific
Plans
NOTE: Accomplishments are pulled from WasteLAN on a semi-annual basis.
                           B-45
                                                               July 1, 1998

-------
OSWER Directive 9200.3-14-1E
                                   EXHIBIT B.3 (5 of 7)
                      RESPONSE ACTION PLANNING REQUIREMENTS
Planning Requirements
GPRA Target/Annual Performance
Goal
GPRA or Program Measure?
Planned Site-Specifically?
Planned/Reported on Operable Unit
or Whole Site Basis?
Reported Site-Specifically or in Non-
site Specific Portion of WasteLAN?
AOA Category, if Fund-Financed?
AOA Category for Oversight?
Basis for AOA?
RA Contract Award
-
Program Measure
Yes
Operable Unit
Site-Specific
N/A
N/A
N/A
Start of
Response
- Action/Activity
GPRA Target
-
Yes
Operable Unit
Site-Specific
Removal or
Remedial Action
Site
Characterization
Site- or Non-Site
Specific Plans
O&F
-
Program Measure
No
Operable Unit
Site-Specific
Remedial Action
N/A
Site-Specific Plans
                                    EXHIBIT B.3 (6 of 7)
                      RESPONSE ACTION PLANNING REQUIREMENTS
Planning Requirements
GPRA Target/Annual Performance
Goal
GPRA or Program Measure?
Planned Site-Specifically?
Planned/Reported on Operable Unit
or Whole Site Basis?
Reported Site-Specifically or in Non-
site Specific Portion of WasteLAN?
AOA Category, if Fund-Financed?
AOA Category for Oversight?
Basis for AOA?
LTRA
-
Program Measure
Yes
Operable Unit
Site-Specific
Remedial Action
Site
Characterization
Site-Specific
Plans
,7. Completion of
> a Response "
Action/ Activity
-
GPRA Measure
Yes
Operable Unit
Site-Specific
N/A
N/A
N/A
NPL Site
Construction
Completion
GPRA Target
-
Yes
Whole Site
Site-Specific
N/A
N/A
N/A
O&M
-
Program
Measure
Yes
Operable Unit
Site-Specific
N/A
Site
Characterization
Federal Facility
Site-Specific
Plans
July 1,1998
                NOTE: Accomplishments are pulled from WasteLAN on a semi-annual basis
B-46

-------
                                                   OSWER Directive 9200.3-14-1E
                      EXHIBIT B.3 (7 of 7)
        RESPONSE ACTION PLANNING REQUIREMENTS
•?<<•; y-( & . ,.v " ",>,
-.^Planning Requirements "
' ."'.-"•' '"5 ";&
GPRA Target/Annual
Performance Goal
GPRA or Program
Measure?
Planned Site-Specifically?
Planned/Reported on
Operable Unit or Whole
Site Basis?
Reported Site-Specifically
or in Non-Site Specific
Portion of WasteLAN?
AOA Category, if Fund-
Financed?
AOA Category for
Oversight?
Basis for AOA?
% ^N^Site*.
j| Completions-
s- w; ;'"• %-A
... - •-.!_.• - . • ,,
t* -', " '•&
-
GPRA
Measure
Yes
Whole Site
Site-Specific
N/A
N/A
N/A
' ">'?*«-ii
•^^m-
„/ -'Reviews *fi
\m&t^
-
Program
Measure
Yes
Whole
Site
Site-
Specific
Remedial
Action
Remedial
Action
Federal
Facility
Site-
Specific
Plans
•" Fiye-YiaEii-
vr*- 'i?&* -^
?j.:,, Ij&vie,w_ .^:
^Completions
v'' 5«* '•Cft'"'^-1-
-
Program
Measure
Yes
Whole Site
Site-Specific
N/A
N/A
N/A
• Ik"**-'.
&^?&4
^.Delefaonv/
^
-
Program
Measure
Yes
Portion of
Site as
identified
Site-
Specific
N/A
N/A
N/A
%^|||fp]Sti '
x tfeletidn:-
1?- -* Mi
-
Program
Measure
Yes
Whole
Site
Site-
Specific
Other
Response
N/A
Site-
Specific
Plans
'•"... .--Non-NPLff
%4*$fte"-S;
^Completions
-.:-ft - •- '•<'"•{
-
GPRA
Measure
Yes
Whole Site
Site-Specific
N/A
N/A
N/A
Planning Requirements
GPRA Target/Annual
Performance Goal
GPRA or Program
Measure?
Planned Site-Specifically?
Planned/Reported on
Operable Unit or Whole
Site Basis?
Reported Site-Specifically
or in Non-Site Specific
Portion of WasteLAN?
AOA Category, if Fund-
Financed?
AOA Category for
Oversight?
Basis for AOA?
Indicators
- A-C
-
GPRA
Measure
No
Whole Site or
Operable Unit
Site-Specific
N/A
N/A
N/A
NOTE: Accomplishments are pulled from WasteLAN on a semi-annual basis.
                            B-47
                                                                  July 1, 1998

-------
OSWER Directive 9200.3-14-lE
                                        This Page Intentionally
                                              Left Blank
July 1, 1998
B-48

-------
                                          OSWER Directive 9200.3-14-1E
Superfund/Oil Program Implementation Manual FY 99/00




              Appendix C: Enforcement
                                                       July 1, 1998

-------
 OSWER Directive 9200.3-14-IE
                                        This Page Intentionally
                                             Left Blank
July 1, 1998

-------
                                                                        OSWER Directive 9200.3-14-1E

                                           Appendix C
                                           Enforcement

                                        Table of Contents

FY 99/00 TARGETS AND MEASURES FOR BASELINE ENFORCEMENT	 C-l
    Overview	 C-l
    Targets and Measures For Baseline Enforcement	:	 C-4
        Potentially Responsible Party (PRP) Search Starts	 C-4
        PRP Search Completions	 C-4
        Section 104(e) Letters Issued	 C-5
        Receipt of Responses to Section 104(e) Letters	,	,	 C-6
        Section 104(e) Referrals and Orders Issued	 C-6
        Issuance of General Notice Letters (GNLs)	 C-7
        Issuance of Special Notice Letters (SNLs)	 C-7
        Expanded Site Inspection/Remedial Investigation/Feasibility Study (ESI/RI/FS) Negotiation
           Starts	,	 C-8
        Remedial Design/Remedial Action (RD/RA) Negotiation Starts	 C-8
        Completion or Termination of Negotiations for RD/RA [formerly known as RD/RA
           Negotiation Completions]	 C-9
        Completion or Termination of Negotiations for Cleanup (RD/RA, Removals, and Other) [formerly
           known as Cleanup Negotiation Completions]	C-10
        State Order for ESI/RI/FS	 C-12
        State Consent Decree for RD/RA	 C-12
        Total Response Commitments (Including Dollar Value) [formerly known as Total Response
           Settlements (Including Dollar Value)}	 C-13
        De Minimis Settlements and Number of Parties	 C-14
        Cash Out Settlements	 C-16
        Section 106, 106/107, 107 Case Resolution	 C-17
        Administrative Record for Selection of Response Action	 C-18
        Issuance of Demand Letter	 C-18
        Total Cost Recovery Settlements (Including Dollar Value)	 C-18
        Past Costs Addressed > $200,000 Via Settlements, Write-Offs, or Referrals [formerly known as
           Past Costs Addressed >_ $200,000]	 C-19
        Recoverable Past Costs That Have Been Addressed by Program to Date Via Settlements,
           Write-Offs, or Referrals [formerly known as Recoverable Past Costs That Have Been
           Addressed Program to Date]	 C-21
        Number and Amount of CERCLA Penalties Assessed	 C-22
        Number and Amount of CERCLA Supplemental Environmental Projects (SEPs)	 C-23
        Compliance Monitoring: Noncompliance with Active Enforcement Instrument for Response and
           Enforcement Action Taken [formerly known as Noncompliance with Consent Decrees,
           Administrative Orders on Consent, and Unilateral Administrative Orders AND formerly
           known as Noncompliance with Consent Decrees, Administrative Orders on Consent, and
           Unilateral Administrative Orders That Have Been Addressed]	 C-24

FY 99/00 TARGETS AND MEASURES FOR ENFORCEMENT REFORMS	 C-26
    Overview of Enforcement Reforms	 C-26
    Definitions of Enforcement Reforms	'	 C-26
                                                                                         July 1, 1998

-------
 OSWER Directive 9200.3-14-IE

                                            Appendix C
                                           Enforcement

                                    Table of Contents (cont'd)

        Use of Alternative Dispute Resolution (ADR)	  C-26
        Number of Settlements Where EPA Settled Based on Ability-to-Pay Determinations 	  C-27
        Prospective Purchaser Agreements (PPAs) ...;	  C-28
        Issuance of Comfort/Status Letters  	  C-29
        Orphan Share - EPA Offer and Compensation	  C-30
        Use of Interest Bearing Special Accounts 	  C-31
        Issue Cleanup Orders to Parties in an Equitable Manner	  C-32
        De Micromis Settlements and Number of Parties 	  C-33
        PRP Oversight Administration	  C-35
July 1, 1998

-------
                                                             OSWER Directive 9200.3-14-IE

                                     Appendix C
                                    Enforcement

                                   List of Exhibits

EXHIBIT C.I ENFORCEMENT ACTIVITIES	  C-2

EXHIBIT C.2 ENFORCEMENT PLANNING REQUIREMENTS 	  C-37
                                                                           July 1, 1998

-------
 OSWER Directive 9200.3-14-lE
                                        This Page Intentionally
                                             Left Blank
July 1, 1998

-------
                                                                          OSWER Directive 9200.3-14-IE
                                           APPENDIX C
                            FY 99/00 TARGETS AND MEASURES
                                      FOR ENFORCEMENT
OVERVIEW
    The Superfund Comprehensive Accomplishments Plan (SCAP) is used by the Assistant Administrator for the Office
of Solid Waste and Emergency Response (AA OSWER), Assistant Administrator for the Office of Enforcement and
Compliance Assurance (AA OECA), and senior Superfund managers to monitor the progress each Region is making
towards achieving the Government Performance and Results Act (GPRA) targets and annual performance goals. In
addition, SCAP will continue to be used as an internal management tool to project and track activities that contribute
to these GPRA goals and support resource allocation. The program will set national goals based on historical
performance and performance expectations within a limited budget  for the performance goals in GPRA and  track
accomplishments in the  activities contributing  to those  goals.   Regions  should continue to plan  and report
accomplishments in WasteLAN as they have traditionally.

    To more clearly reflect the relationship between GPRA and the SCAP process, targets (GPRA targets/annual
performance goals) and  measures (GPRA and program  measures) are defined as follows:

•   GPRA Targets/Annual Performance Goals are a subset of the overall planning and budgeting information that has
    traditionally been tracked by  the Superfund program offices.   They are numerical goals that are  established
    nationally prior to the start of the operating year; for example, 136 construction completions at Superfund  National
    Priorities List (NPL) sites in FY 99.

•   Measures are activities deemed essential to tracking overall program progress. There are two types of measures:
    GPRA measures and program measures. GPRA measures simply track the number of actions that occur through
    the year (accomplishments) and are used to evaluate program progress; for example, the number of  agreements
    negotiated with States and Tribes. Program measures are used to project the number of actions that each Region
    expects to perform during the year using anticipated resources; for example, the number of sites where EPA settled
    based on ability-to-pay determinations.

    This appendix includes the enforcement Measures  of Success that were devised by HQ in consultation with the
Regions to address Enforcement reforms.  These measures, which  can be found following the description of the
targets/internal measures for the baseline enforcement program, have been developed to respond to an increasing demand
for information that is not currently tracked or reported. By supplementing the baseline targets and measures with these
Measures  of Success, the program hopes to produce a  more complete picture of enforcement-related successes and
accomplishments at Superfund sites.

    In addition to  the measures in this manual, the Regions should continue to provide information in  WasteLAN
regarding Potentially Responsible  Parties (PRPs) as requested in OSWER directive 9200.3-14-1A and Compliance
Monitoring as requested in OSWER directive 9872.50.
                                                  C-l                                       My 1, 1998

-------
 OSWER Directive 9200.3-14-1E
                                       EXHIBIT C.I
                               ENFORCEMENT ACTIVITIES
ACTIVITY
GPRA TARGET/
ANNUAL
PERFORMANCE
GOAL
MEASURE
GPRA
PROGRAM
ACTIVITIES FOR BASELINE ENFORCEMENT
Potentially Responsible Party (PRP) Search Starts
PRP Search Completions
Section 104(e) Letters Issued
Receipt of Responses for Section 104(e) Letters Issued
Section 104(e) Referrals and Orders Issued
Issuance of General Notice Letters (GNLs)
Issuance of Special Notice Letters (SNLs)
Expanded Site Inspection/Remedial Investigation/Feasibility Study
(ESI/RJ/FS) Negotiation Starts
Remedial Design/Remedial Action (RD/RA) Negotiation Starts
Completion or Termination of Negotiations for RD/RA [formerly known as
RD/RA Negotiation Completions]
Completion or Termination of Negotiations for Cleanup (RD/RA, Removals,
and Other) [formerly known as Cleanup Negotiation Completions]
State Order for ESI/RI/FS
State Consent Decree for RD/RA
Total Response Commitments (Including Dollar Value) [formerly known as
Total Response Settlements (Including Dollar Value)]
De Minimis Settlements and Number of Parties
Cash Out Settlements
Section 106, 106/107, 107 Case Resolution
Administrative Record for Selection of Response Action
Issuance of Demand Letter
Total Cost Recovery Settlements (Including Dollar Value)













^
/












,
,/
/










/
/
/
/
/
/
/
/


T
/
/


^
/
/
/
^
July 1, 1998
C-2

-------
                                                                      OSWER Directive 9200.3-14-IE
                                           EXHIBIT C.I
                               ENFORCEMENT ACTIVITIES (cont'd)
ACTIVITY , ^ '' Vj~
Past Costs Addressed > $200,000 Via Settlements, Write-Offs, or Referrals
[formerly known as Past Costs Addressed >_ $200,000]
Recoverable Past Costs That Have Been Addressed by Program to Date Via
Settlements, Write-Offs, or Referrals [formerly known as Recoverable Past
Costs That Have Been Addressed Program to Date]
Number and Amount of CERCLA Penalties Assessed
Number and Amount of CERCLA Supplemental Environmental Projects
(SEPs)
Compliance Monitoring: Noncompliance with Active Enforcement
Instrument for Response and Enforcement Action Taken [formerly known as
Noncompliance with Consent Decrees, Administrative Orders on Consent,
and Unilateral Administrative Orders AND formerly known as
Noncompliance with Consent Decrees, Administrative Orders on Consent,
and Unilateral Administrative Orders That Have Been Addressed]
//
GPRA TARGET/-
> c ANNUAL
PERFORMANCE
f GOAL
/




MEASURE
GPRA
f|<
1




PROGRAM

/
/
S
/
ACTIVITIES FOR ENFORCEMENT REFORMS
Use of Alternative Dispute Resolution (ADR)
Number of Settlements Where EPA Settled Based on Ability-to-Pay
Determinations
Prospective Purchaser Agreements (PPAs)
Issuance of Comfort/Status Letters
Orphan Share - EPA Offer and Compensation
Use of Interest Bearing Special Accounts •
Issue Cleanup Orders to Parties in an Equitable Manner
De Micromis Settlements and Number of Parties
PRP Oversight Administration


^



,/


S
/

S
/
/

/









S
NOTE:  Accomplishments are pulled from WasteLAN on a quarterly basis. Measures are planned and reported quarterly.
                                                  C-3
July 1, 1998

-------
 OS WER Directive 9200.3-14-IE

 TARGETS AND MEASURES FOR BASELINE ENFORCEMENT

 Note:  WasteLAN coding requirements contained in the  definitions are only for key data elements.  For a full list of
 requirements and suggested data elements, see the SCAP/Oil Coding Guide for the current FY.


 POTENTIALLY RESPONSIBLE PARTY (PRP) SEARCH STARTS

 Definition:
 A PRP search identifies PRPs at the site and establishes PRP  liability, capability, and financial viability.  At all sites, the PRP
 search activities should be initiated as soon as possible after  the Region decides that a response (removal or remedial) action
 is likely to be required at the site. For sites where remedial actions will be conducted, the PRP search should be initiated in time
 to send a SNL (at least 90 days prior to the obligation of funds for an ESI/RI, RI/FS or RA). For sites where removal actions
 will be conducted, the PRP search should be initiated as sqon as the need  for the removal has been identified in order to give
 a verbal notice of potential liability or to issue a general notice letter.

 Definition of Accomplishment:
 If the National Priorities List (NPL) PRP search (Action Name = NPL RP Search) or non-NPL PRP search (Action Name =
 Non-NPL PRP Search) is being conducted by a contractor, the actual start date (Actual Start) is considered to be the date the
 PRP search work assignment or procurement request is signed by the Contracting Officer (CO) or the designated Contracting
 Officer Representative (COR). The start for both the NPL and non-NPL PRP search is documented by the signed procurement
 request or work assignment.  If the NPL or non-NPL PRP search is conducted by EPA in-house, the actual start date  (Actual
 Start) is the date EPA staff develops the PRP search plan, the date the On-Scene Coordinator (OSC) receives confirmation of
 a spill identification number from the Regional  Finance Office, or the date EPA initiates and documents search activities by
 some other means.

 Changes in Definition FY 98  - FY 99/00:
 The stated goal of the PRP search in the Definition was expanded. The work assignment may be signed by the Contracting
 Officer (CO) or the designated Contracting Officer Representative (COR).

 Special Planning/Reporting Requirements:
 PRP searches (Action Name = Non-NPL PRP Search or NPL RP Search) are planned and funds requested on a site-specific
 basis.  PRP Search Starts is a program measure.


 PRP SEARCH COMPLETIONS

 Definition:
 A PRP search  completion constitutes the completion of the activities taken by the Region  to identify PRPs at a site. In
 conducting the PRP search, the Region must consider which of the criteria outlined below are cost effective and reasonable to
 meet relative to the anticipated overall cleanup costs at the site. Upon completion, Regions should document in the site file that
 they have met all reasonable achievable criteria. Criterion 1  is mandatory for all PRP search completions. The PRP search
 should ideally be completed prior to completion  of cleanup negotiations; however, it is recognized that this may  not be
 achievable in all situations.
July 1, 1998                                         C-4

-------
                                                                         OSWER Directive 9200.3-14-1E

The recommended criteria for a thorough PRP search are:

1.   Initiate a dialogue with early identified PKPs for the purpose of providing an opportunity for PRP input into the PRP
    search;

2.   Collect the financial and contribution data needed to perform equitable share calculations;

3.   Follow-up on all leads as a way to identify parties to the site;                                           •

4.   Make de_ minimis and de micromis determinations for all parties at the site;

5.   Categorize all parties [e.g., Generator/Transporter, Owner/Operator, Small Business ($2 million or less gross annual
    revenue and 25 or less employees), Municipal Solid Waste Contributor, etc.]; and

6.   Perform a financial viability determination on all PRPs asserting ability-to-pay problems.

Definition of Accomplishment:
The PRP search (Action Name = NPL RP Search or Non-NPL PRP Search) is complete when all applicable activities described
in the Agency's PRP Search Manual have been completed and documentation has been placed in the site file that the Region
has met all reasonable achievable criteria for the PRP search, a PRP search outcome report with a list of PRPs has been prepared
and both the actual completion date (Actual Complete) and the outcome (Qualifier) of the search have been entered into
WasteLAN.  If no PRPs are found, the Region must document in the site file that it has met all reasonable achievable criteria
for the PRP search and enter the actual completion date (Actual Complete) and the Qualifier of 'No PRPs Identified (NP)' into
WasteLAN. This definition applies to both Phase I (single owner, operator site) and Phase II (multi-generator site) PRP
searches.

Changes in Definition FY  98 - FY 99/00:                        !
Deleted the requirement that an ability to pay determination is required for recalcitrant parties.

Special Planning/Reporting Requirements:
PRP search completions (Action Name = Non-NPL PRP Search or NPL RP Search) are planned on a site-specific basis. The
search outcome (Qualifier) is to be entered into WasteLAN. The number of PRPs found may be system generated by entering
and associating PRPs with sites and selecting an Identification Source of "PRP Search." PRP search completions is a program
measure.


SECTION 104(E) LETTERS ISSUED

Definition:
This is a letter issued under Section 104(e) of CERCLA. It requests information from PRPs on matters such as: the  nature and
extent of a release or threatened release at a site; the nature and quantity of hazardous materials at the site; and the financial
ability of the PRP to  pay for possible response actions.  Section  104(e) letters issued are tied to a PRP search and other
enforcement actions.

Definition of Accomplishment:
This activity is accomplished on the date the information request letter is signed by the appropriate EPA official and entered
into WasteLAN as the SubAction, Issue Req Lttrs - 104(e), with an actual completion date (Actual Complete).
                                                     C-5                                    July 1,1998

-------
 OSWER Directive 9200.3-14-1E

 Changes in Definition FY 98 - FY 99/00:
 None.
                                               .                  I          ;                        ;

 Special Planning/Reporting Requirements:
 Section 104(e) letters issued is a program measure. Issue Req Lttrs - 104(e) is a valid SubAction for PRP search, negotiation,
 and enforcement instrument actions.  Follow-up 104(e) letters are not tracked under this measure but may be entered into
 WasteLAN through the Document Compliance screens.

                                                                 i

 RECEIPT OF RESPONSES TO SECTION 104(E) LETTERS

 Definition:
 This is a response to a letter issued under Section 104(e) of CERCLA. The response from the recipients may include: the
 nature and extent of a release or threatened release at a site; the nature and quantity of hazardous materials at the site; and
 the financial ability of the PRP to pay for possible response actions.

 Definition of Accomplishment:
 Date the response to a 104(e) letter is received from a recipient and entered into WasteLAN as the Response Received Date
 on the Document Compliance Tracking screen.

 Changes in Definition FY 98 - FY 99/00:
 This is a new program measure.

 Special Planning/Reporting Requirements:
 Receipt of responses to Section 104(e) letters will be tracked through the Document Compliance screens in WasteLAN.  This
 is a program measure.


 SECTION 104(E) REFERRALS AND ORDERS ISSUED

 Definition:
 Section 104(e) referrals/orders are enforcement actions to compel PRPs to respond to EPA requests for information or to obtain
 site access.

 Definition of Accomplishment:
 The date the memo from the Regional Administrator transmitting the Section 104(e) referral to HQ or to the Department of
 Justice (DOJ) is recorded in WasteLAN as the actual start date (Actual Start) of the Section 104(e) referral (Action Name =
 Section 104(e) Ref.  Litigation). The date a Section 104(e) Unilateral Administrative Order (UAO) is signed by the Regional
 Administrator or delegatee is recorded in WasteLAN as the actual completion date (Actual Complete) of the UAO (Action
 Name = Unilateral Admin Order).

 Changes in Definition FY 98 - FY 99/00:
The order may be signed by the Regional Administrator or delegatee.
July 1, 1998                                       C-6

-------
                                                                      OSWER Directive 9200.3-14-IE

Special Planning/Reporting Requirements:
The actual start date (Actual Start) of the referral (Action Name = Section 104(e) Ref. Litigation) or the actual completion date
(Actual Complete) of the order (Action Name = Unilateral Admin Order) is entered into WasteLAN site-specifically. The
Law/Section reported in WasteLAN should be "CERCLA 104(e)" [(Law/Section = CERCLA  104(e)]. This is a program
measure.


ISSUANCE OF GENERAL NOTICE LETTERS (GNLs)

Definition:
Letter sent by EPA under Section 122 of CERCLA informing recipients of their potential liability for cleanup actions at the site.
It is usually sent out during the PRP search or during preparation for negotiations.

Definition of Accomplishment:
This activity is accomplished on the date the GNL is signed by the appropriate EPA official and entered into WasteLAN as the
SubAction, Notice Letters Issued, with an actual completion date (Actual Complete).

Changes in Definition FY 98 - FY 99/00:
None.

Special Planning/Reporting Requirements:
General Notice Letters are recorded as a SubAction to PRP search or negotiation actiqns. GNL  is a program measure.


ISSUANCE OF SPECIAL NOTICE LETTERS (SNLs)

Definition:
A SNL is a letter from EPA to the PRPs informing them of their potential liability and inviting  them to offer to conduct the
planned response action(s) at the site. This letter, under Section 122(e) of CERCLA, triggers a negotiation moratorium allowing
the PRPs to consider EPA's invitation to negotiate. The moratorium period varies depending on the response action (ESI/RI/FS,
RD, or RA) and can be extended if necessary.

Definition of Accomplishment:
This activity is accomplished on the date the SNL is signed by the appropriate EPA official and entered into WasteLAN as a
SubAction, Special Notice Issued, with an actual completion date (Actual Complete). The date  of issuance of the SNL also
constitutes the start of negotiations [Action Name = RI/FS Negotiations, RD/RA  Negotiations, Negotiations (Generic), or
Removal Negotiations].

Changes in Definition FY 98 - FY 99/00:
None.

Special Planning/Reporting Requirements:
SNLs are recorded as a SubAction to PRP search or negotiation actions. The actual completion  date of the SNL is the same
as the actual start date (Actual Start) of the applicable negotiation action. Issuance of SNLs is a  program measure.
                                                  C-7                                  July 1, 1998

-------
OSWER Directive 9200.3-14-IE

EXPANDED SITE INSPECTION/REMEDIAL INVESTIGATION/FEASIBILITY STUDY
(ESI/RI/FS) NEGOTIATION STARTS

Definition:
ESI/RI/FS negotiations are discussions between EPA and the parties on their liability, willingness, and ability to conduct the
ESI/RI/FS.

Definition of Accomplishment:
ESI/RI/FS negotiations start when:

•   The first SNL is signed by the appropriate EPA official. This date is reported in WasteLAN as the start (Actual Start) of
    negotiations [Action Name = Negotiations (Generic) or RI/FS Negotiations] and the completion (Actual Complete) of the
    SNL SubAction (SubAction Name = Special Notice Issued); or
                                                                      1
•   A Section 122(a) waiver of SNL is signed by the appropriate EPA official with the intent to pursue negotiations without
    moratorium procedures.  This date is reported in WasteLAN as the start (Actual Start) of negotiations [Action Name =
    Negotiations (Generic) or RI/FS Negotiations] and  the completion (Actual Complete) of the SNL waiver SubAction
    (SubAction Name = Notice of S 122 Waiver Issued).

Changes in Definition FY 98 - FY 99/00:
None.
                                                  !                 |          I
Special Planning/Reporting Requirements:
If the Region does not plan to perform ESI/RI/FS negotiations at a site, negotiation dates should not be placed in WasteLAN.
The start of ESI/RI/FS negotiations [Action Name = Negotiations (Generic) or RI/FS Negotiations] should be planned site-
specifically. The "Response Actions Sought" and "Response Actions to be Reimbursed" (if applicable) are to be entered into
WasteLAN.  The actual start of the negotiation action is the same as the actual complete date (Actual Complete) of the SNL
or waiver of SNL. ESI/RI/FS negotiation starts is a program measure.
                                                                   i                ' '

REMEDIAL DESIGN/REMEDIAL ACTION  (RD/RA) NEGOTIATION STARTS

Definition:
RD/RA negotiations are discussions between EPA and the parties on their liability, willingness, and ability to implement the
long-term remedy selected in the ROD for the site or Operable Unit (OU).

Definition of Accomplishment:
RD/RA negotiations start when:

•   The first SNL is signed by the appropriate EPA official. This date is reported in WasteLAN as the start (Actual Start) of
    negotiations [Action Name = Negotiations (Generic)  or RD/RA Negotiations] and the completion (Actual Complete) of
    the SNL SubAction (SubAction Name = Special Notice Issued); or

•   A Section 122(a) waiver of SNL is signed by the appropriate EPA official with the intent to pursue negotiations without
    moratorium procedures.  This date is reported in WasteLAN as the start (Actual Start) of negotiations [Action Name =
    Negotiations (Generic) or RD/RA Negotiations] and the completion (Actual Complete)  of the SNL waiver SubAction
    (SubAction Name = Notice  of S 122 Waiver Issued).
July 1, 1998                                        C-8

-------
                                                                         OSWER Directive 9200.3-14-IE

Changes in Definition FY 98 - FY 99/00:
None.

Special Planning/Reporting Requirements:
If the Region does not plan to conduct RD/RA negotiations, dates should not be entered into WasteLAN.  The start of RD/RA
negotiations [Action Name = Negotiations (Generic) or RD/RA Negotiations] is planned site-specifically. The "Response
Actions Sought" and "Response Actions to be Reimbursed" (if applicable) are to be entered into WasteLAN. The "Response
Actions Sought" must include one or more of the following actions: Remedial Design, Remedial Action, PRP RD or PRP RA.
The actual start of the negotiation action is the same as the actual completed date (Action Complete) of the SNL or waiver of
SNL. RD/RA negotiation starts is  a GPRA measure.


COMPLETION OR TERMINATION OF NEGOTIATIONS FOR RD/RA  [FORMERLY KNOWN AS
RD/RA NEGOTIATION COMPLETIONS]

Definition:
RD/RA negotiations are discussions between EPA and the parties on their liability, willingness, and ability to implement the
long-term remedy selected in the ROD for the site or Operable Unit (OU).

RD/RA negotiations end when the  Region decides how to proceed with the RD/RA.

Definition of Accomplishment:
Credit is given at NPL and NPL-caliber sites when:

•   A signed Consent Decree (CD) under Section 106 of Section 106/107  and a 10-point analysis for RD or RA is referred by
    the Regional Administrator to either DOJ or HQ. The negotiation [Action Name = Negotiations (Generic) or RD/RA
    Negotiations] actual completion date (Actual Complete) is the date of the signed transmittal memo, which is the CD (Action
    Name = Consent Decree) actual start date (Actual Start); or

•   A Unilateral Administrative Order (UAO) for RD or RA is signed by the Regional Administrator or delegatee.  The
    negotiation [Action Name = Negotiations (Generic) or RD/RA Negotiations] actual completion date (Actual Complete)
    is the date the UAO (Action Name = Unilateral Admin Order) is signed, which is the UAO actual completion date (Actual
    Complete); or

•   A Section 106 or Section 106/107 injunctive referral to compel the PRP  to perform the RD or RA as specified in a UAO
    is referred by the Regional Administrator to DOJ or HQ. The negotiation [Action Name = Negotiations (Generic) or
    RD/RA Negotiations] actual completion date (Actual Complete) is the date of the Regional Administrator's transmittal
    memo, which is the litigation [Action name = Litigation (Generic), Section 106 & 107 Litigation, or Section 106 Litigation]
    actual start date (Actual Start); or

•   EPA and PRPs are notified by a letter from DOJ of the date on which they will proceed to trial under an existing case. The
    negotiation [Action Name = Negotiations (Generic) or RD/RA Negotiations] actual completion date (Actual Complete)
    is the same as the date (Actual Complete) the trial begins (SubAction Name - Trial Started); or

•   An Administrative Order on Consent (AOC) for RD only is signed by the Regional Administrator or delegatee. Where an
    AOC for RD only is issued, no credit will be given for the subsequent RA negotiation starts and completions.  Credit will,
    however, be given under Total Response Settlements for the referral of a CD for RA to DOJ or HQ. The negotiation
    [Action Name = Negotiations (Generic) or RD/RA Negotiations] actual completion date (Actual Complete) is the date the
    AOC is signed, which is the AOC (Action Name = Admin Order on Consent) actual completion (Actual Complete).


                                                    C-9                 .                   July 1,  1998

-------
OSWER Directive 9200.3-14-1E

    If Special Notice Letters are issued specifically to initiate RD/RA negotiations and the negotiations result in an amendment
    to  an existing settlement to include RD/RA, the  negotiation [Action Name = Negotiations (Generic) or RD/RA
    Negotiations] actual completion date (Actual Complete) is the date the amended settlement is signed. This amendment date
    is tracked as the actual completion date (Actual Complete) of the settlement SubAction, Enforcement Action Amended;
    or

For NPL sites only:

•   Funds are obligated through a contract modification or work assignment signed by the CO, an IAG signed by the other
    Federal agency, or a Cooperative Agreement signed by the designated Regional official for a Fund-financed RD or RA.
    The negotiation [Action Name = Negotiations (Generic) or RD/RA Negotiations] actual completion date (Actual Complete)
    is the date funds are obligated. If funds are not available and  the Region decides a UAO is not appropriate, the negotiation
    [Action Name = Negotiation (Generic) or RD/RA Negotiations] actual completion date (Actual Complete) is the date of
    the written documentation of the Region's decision not to issue a UAO.

This measure will track and report NPL and NPL-caliber sites separately.

Changes in Definition FY 98 - FY 99/00:
HQ is not required to concur on a decision by the Region not to issue a UAO. Administrative Orders may be signed by the
Regional Administrator or delegatee. Measure name has been changed.

Special Planning/Reporting Requirements:
This is a GPRA measure. RD/RA negotiation completions are planned site-specifically. The negotiation completion date is
reported in WasteLAN as the actual completion date (Actual Complete) of either generic negotiations or RD/RA negotiations
[Action Name = Negotiations (Generic) or RD/RA Negotiations].  The "Response Actions Sought" and the outcome of the
negotiations [Outcome(s) Selected or Outcome Actions Selected] also must be reported in WasteLAN.  The "Response Actions
Sought" must include one or more of the following actions: Remedial Design, Remedial Action, PRP RD or PRP RA.


COMPLETION OR TERMINATION OF NEGOTIATIONS FOR CLEANUP (RD/RA,
REMOVALS, AND OTHER) [FORMERLY KNOWN AS CLEANUP NEGOTIATION COMPLETIONS]

Definition:
Cleanup negotiations are discussions between EPA and the parties on their liability, willingness, and ability to conduct the
cleanup. Negotiations are complete (for NPL and NPL-caliber sites) when a decision has been made as to how the Region will
proceed with the cleanup.

Definition of Accomplishment:
Credit is given at NPL and NPL-caliber sites when:

•   A signed CD under Section 106 or Section 106/107 and a 10-point analysis for RD, RA, groundwater monitoring activities
    post ROD, institutional controls, or a time-critical or NTC removal is referred by the Regional Administrator to either DOJ
    or HQ. The negotiation [Action Name = Negotiations (Generic), RD/RA Negotiations, or Removal Negotiations] actual
    completion date (Actual Complete) is the date of the signed transmittal memo, which is the CD (Action Name = Consent
    Decree) actual start date (Actual Start); or
July 1,1998                                        C-10

-------
                                                                           OSWER Directive 9200.3-14-1E

•   A UAO for RD, RA, groundwater monitoring activities post ROD, institutional controls, or a time-critical or NTC removal
    is signed by the Regional Administrator or delegatee. The negotiation [Action Name = Negotiations (Generic), RD/RA
    Negotiations, or Removal Negotiations] actual completion date (Actual Complete) is the date the UAO (Action Name =
    Unilateral Admin Order) is signed which is the UAO actual completion date (Actual Complete); or

•   A Section 106 or Section 106/107 injunctive referral to compel the PRP to perform the cleanup (RD or RA) as specified
    in a UAO is referred by the Regional Administrator to DOJ or HQ.  The negotiation [Action Name = Negotiations
    (Generic) or RD/RA Negotiations] actual completion date (Actual Complete) is the date of the Regional Administrator's
    transmittal memo, which is the litigation [Action Name = Litigation (Generic), Section 106 & 107 Litigation, or Section
    106 Litigation] actual start date (Actual Start); or

•   A Prospective Purchaser Agreement (PPA) implementing the entire remedy is signed by the Regional Administrator or
    delegatee. Credit is not given for negotiation completions as a result of a PPA which implements part of the remedy. The
    negotiation [Action Name = Negotiations (Generic), Removal Negotiations or RD/RA Negotiations] actual completion date
    (Actual Complete) is the date the PPA (Action  Name = Admin Order on Consent or Consent  Agreement and Enf.
    Instrument Category - Prospective Purchaser Agreement) is signed by the Regional Administrator or delegatee which is
    the actual completion date (Actual Complete) of the AOC or Consent Agreement; or

•   EPA and PRPs are notified by a letter from DOJ of the date on which they will proceed to trial under an existing case. The
    negotiation [Action Name = Negotiations (Generic) or RD/RA Negotiations] actual completion date (Actual Complete)
    is the same as the date (Actual Complete) the trial begins (SubAction Name = Trial Started); or

•   An AOC for RD only, for groundwater monitoring  activities post ROD or institutional controls is signed by the Regional
    Administrator  or delegatee.  Where  an AOC for RD only is  issued, no credit will be given for the subsequent RA
    negotiation start and completion. Credit will be given under Total Response Settlements for the referral of a CD for RA
    to DOJ or HQ.  The negotiation [Action Name = Negotiations (Generic) or RD/RA Negotiations] actual completion date
    (Actual Complete)  is the date the AOC is signed, which is the AOC (Action Name = Admin Order on Consent)  actual
    completion date (Actual Complete).

•   An AOC for a time-critical or NTC removal is signed by the Regional Administrator or delegatee. The negotiation [Action
    Name = Negotiations (Generic) or Removal Negotiations] actual completion  date (Actual Complete) is the date the AOC
    is signed, which is the AOC  (Action Name = Admin Order on Consent) actual completion date (Actual Complete); or

•   For settlements that are amended to include cleanup actions, the negotiation [Action Name = Negotiations (Generic),
    RD/RA Negotiations, or Removal Negotiations]  actual completion  date (Actual Complete) is the date the  amended
    instrument is signed. This amendment date is tracked as the actual completion date (Actual  Complete) of the SubAction,
    Enforcement Action Amended; or

•   Funds are obligated through a contract modification or work assignment signed by the CO, an IAG signed by the other
    Federal agency, or a Cooperative Agreement signed by the designated Regional official for a Fund-financed time-critical
    or NTC removal or RA.  Only those sites that are final on the NPL are eligible for Fund-financed RAs. The
    negotiation [Action Name = Negotiations (Generic), Removal Negotiations, or RD/RA Negotiations] actual completion
    date (Actual Complete) is the date funds are obligated.  If funds are not available and the Region decides a UAO is not
    appropriate, the negotiation [Action Name = Negotiations (Generic), Removal  Negotiations, or RD/RA Negotiations]  actual
    completion date (Actual Complete) is the date of the written documentation  of the Region's decision not to issue the  UAO.

This measure will track and report NPL and NPL-caliber sites separately.
                                                     C-ll                                    July 1,1998

-------
OSWER Directive 9200.3-14-IE

Changes in Definition FY 98 - FY 99/00:
HQ is no longer required to concur on the Region's decision not to issue a UAO. Administrative Orders may be signed by th
Regional Administrator or delegatee. Regions will only receive credit for negotiation completions as a result of a PPA if the
prospective purchaser implements the entire remedy. Measure name has been changed. Consistent with revisions to Appendix
B, early actions (remedial authority) were deleted and early actions (removal authority) was changed to removals.

Special Planning/Reporting Requirements:
This is a program target. Cleanup negotiation completions are planned site-specifically. The negotiation completion date is
reported in WasteLAN as the actual completion date (Actual Complete) of either generic negotiations, RD/RA negotiations,
or removal  negotiations [Action Name = Negotiations  (Generic), RD/RA Negotiations, or Removal Negotiations].  The
"Response Actions Sought" and the outcome of the negotiations [Outcome(s) Selected or Outcome Actions Selected] also must
be reported in WasteLAN. Regions will receive credit for the completion of cleanup negotiations that result in the signature
of an AOC or Consent Agreement with a prospective purchaser that is implementing the entire remedy.


STATE ORDER FOR ESI/RI/FS

Definition:
Administrative Order (AO) or CD signed by the State  and  the PRPs for  the PRPs to conduct the Expanded  Site
Inspection/Remedial Investigation/Feasibility Study (ESI/RI/FS).

Definition of Accomplishment:
The date the last State official signs the order or CD. All WasteLAN coding requirements for Federal AOs and CDs apply. The
enforcement action type should be State decree or State order (Action Name = State Consent Decree or State Order) and the
actual completion date should be entered in the "Actual Complete" field in WasteLAN. The "Response Actions Achieved" and
"Response Actions to be Reimbursed" (if applicable) also must be reported in WasteLAN.

Changes in Definition FY 98 - FY 99/00:
None.

Special Planning/Reporting Requirements:
See Definition of Accomplishment. Projections for AOs for ESI/RI/FS are made site-specifically. State Orders for ESI/RI/FS
is a program measure.
                                                                             i

STATE CONSENT DECREE FOR RD/RA

Definition:
A State CD is a judicial agreement between the State and the PRPs when fully or partially settling a claim under CERCLA.
The settlement may be for response work or both response work and cost recovery.
July 1, 1998
C-12

-------
                                                                        OSWER Directive 9200.3-14-IE

Definition of Accomplishment:
The date the State CD is signed by the PRPs and all appropriate State officials. All WasteLAN coding requirements for Federal
CDs apply. The Region should enter the State Consent Decree Action with an actual completion date (Actual Complete) and
the "Response Actions Achieved." The "Response Actions Achieved" fields must include one or more of the following actions:
PRP RD, PRP RA or Groundwater Monitoring (post ROD). If the State CD includes a cost recovery agreement the "Costs
Achieved" and "Response Actions to be Reimbursed" also should be entered into WasteLAN.

Changes in Definition FY 98 -  FY 99/00:
Regions must select a Response Action Achieved of PRP RD or PRP RA or Groundwater Monitoring (post ROD) in order to
receive credit under this measure.

Special Planning/Reporting Requirements:
See Definition of Accomplishment. State CD for RD/RA is a program measure.


TOTAL RESPONSE COMMITMENTS (INCLUDING DOLLAR VALUE) [FORMERLY KNOWN AS
TOTAL RESPONSE SETTLEMENTS (INCLUDING DOLLAR VALUE)]

Definition:
Total Response Commitments is the total universe of CERCLA enforcement instruments where the parties agree to conduct
cleanup work. This measure will require reporting of both the number of enforcement instruments as well as the estimated value
of the response work pursuant to each of those instruments.

Definition of Accomplishment:
Enforcement Instruments at NPL, NPL-caliber, and non-NPL sites include:

•   A Consent Decree (CD) signed by the Regional Administrator and  PRPs and 10-point analysis is transmitted by the
    Regional Administrator to DOJ or HQ, under Section 106 or 106/107 for PRPs to conduct or pay for the response action
    [ESI/RI, RI, RI/FS, FS, RD, RA, groundwater monitoring activities post ROD, institutional controls, time-critical or NTC
    removal.  Credit for the CD referral (Action Name = Consent Decree)  is given on the date on which the Regional
    Administrator's transmittal memo is sent to DOJ or to HQ as recorded in WasteLAN as the actual start date (Actual Start).
    This includes CDs for mixed work, preauthorized mixed funding, and cashout settlements. The appropriate Enforcement
    Instrument Category (Enf Instrument Category Selected = Cashout, De minimis/Cashout. De micromis, Preauthorization,
    or Mixed Funding) also must be entered into WasteLAN; or

•   A Unilateral Administrative Order (UAO) is signed by the Regional Administrator or delegatee for RD or RA, and at least
    one of the PRPs has provided notice of intent to comply unconditionally.  For UAOs for RD/RA, commitment credit is
    given on the date of the PRP's written notice of intent to comply with the order. This is reported in WasteLAN as the actual
    completion date (Actual Complete)  of the notice of intent to comply SubAction (SubAction Name = PRPs Ntfy EPA, Intent
    to Comply).  The actual completion date (Actual Complete) of the order (Action Name = Unilateral Admin Order) is the
    date it is signed.

    If a PRP initially complies with a UAO credit will be given for the UAO when the first PRP provides written notice of
    intent to comply. If, at  a later date, the PRP agrees to a CD for the same work, credit will be given for the CD when it is
    referred by memo to DOJ or HQ.  At this point the UAO Converted  Indicator should be activated on the Enforcement
    Instrument screen and the Region will receive credit for the CD only and not the UAO. When adding the Consent Decree
    Action, the Region should identify the UAO as the predecessor Action through Action Relationships and enter the estimated
    value of the UAO as the estimated value of the CD if the CD covers the same work. If the CD covers more work than the
    UAO it replaces, a revised estimate may be necessary. The WasteLAN reporting requirements for the CD apply; or


                                                   C-13                              .     July  1, 1998

-------
OS WER Directive 9200.3-14- IE

•   For all other response activities, commitment credit is given the date the UAO (Action Name = Unilateral Administrative
    Order) is signed by the Regional Administrator or delegatee as the actual completion date (Actual Complete).
                                                    i                      .
•   An Administrative Order on Consent (AOC) is signed by the Regional Administrator or delegatee for an ESI/RI, RI, RI/FS,
    FS, time-critical or NTC removal or RD.  The date the AOC is signed (Action Name = Admin Order on Consent) is
    reported in WasteLAN as the actual completion date (Actual Complete).

•   Commitment credit is also given when an AOC or Consent Agreement is signed that provides protection from potential
    future liability to a prospective purchaser that is implementing the remedy. The actual completion date (Actual Complete)
    is the date the AOC or Consent Agreement (Action Name = Admin Order on Consent or Consent Agreement and Enf
    Instrument Category Selected = Prospective Purchaser Agreement) is signed by the Regional Administrator or delegatee.

Total  Response Commitments will be reported as a combined total of CDs, Consent Agreements with prospective purchasers,
AOCs, and UAOs, where response  actions have been  achieved.  The value of Total Response Commitments is based on the
estimated value of PRP response work.

Changes in Definition FY 98 - FY 99/00:
Regions will receive credit for UAOs issued for response activities other than RD or RA when the  UAO is signed by the
Regional Administrator or delegatee.  Administrative Orders may be signed by the Regional Administrator or delegatee.
Consistent with revisions to Appendix B, early actions (remedial authority) were deleted and early actions (removal authority)
were changed to removals.  The W,asteLAN data entry instructions reflect the redesign of the Enforcement Instrument screens.
                                                                      I           '             .

Special Planning/Reporting Requirements:
See Definition of Accomplishment. The applicable "Response Actions Achieved," the "Estimated Present Worth Value" of
the response actions the PRPs are performing (see supplement to: OSWER Directive #9200.3-14-la) and, if necessary, the "Enf
Instrument Category" are to be reported in WasteLAN.  Settlement credit will be given for an AOC or Consent Agreement with
a prospective purchaser if "Prospective Purchaser Agreement"  is the selected enforcement instrument category. Existing
settlements for ESI/RI, RI/FS or FS that are amended to include RD should be reported in WasteLAN. The date the amendment
is signed is the actual completion date (Actual Complete) of the SubAction "Enforcement Activity Amended." The Region
should also check the amended instrument flag (Amended Instrument?) and indicate the "Response Actions Added" under the
settlement. Total Response Commitments will be reported  in the ENFR-03 report.  This is a GPRA target/annual performance
goal.


DE M1NIMIS SETTLEMENTS AND NUMBER OF PARTIES

Definition:
This measure reports the total number of administrative  or judicial settlements that are reached under Section 122 of CERCLA,
with PRPs qualified as de_ minimis.  This type of settlement results in PRPs paying a minor portion of the estimated response
costs al the site, and is embodied in a CD or an AOC. If the total response costs at the site exceed $500,000 (excluding interest),
the AOC can only be signed by the Regional Administrator or delegatee after prior written approval from DOJ. If DOJ does
not approve or disapprove the order within 30 days, the order is considered approved and can then be signed by the Region.
The DOJ and the Regional Administrator or delegatee can agree  to extend the 30-day period if necessary.

This measure will examine  the total  number of de minimis settlements under Section 122, the number of PRPs who join such
settlements, and the number of sites at which de, minimis settlements were signed.

Definition of Accomplishment:
Credit is given for de. minimis settlements in the following two categories.


July 1, 1998                                          C-14

-------
                                                                          OSWER Directive 9200.3-14-1E

Category 1: De minimis settlements include:

•   An AOC (Action Name = Admin Order on Consent) signed by the Regional Administrator or delegatee, as reported in
    WasteLAN, as the actual completion date (Actual Complete); or

•   When the Regional Administrator signs the memorandum transmitting the CD (Action Name = Consent Decree) signed
    by the de_ minimis parties to DOJ or HQ, as reported in WasteLAN, as the actual start date (Actual Start).

The number of signatories to the settlement will be system generated in WasteLAN from the identification of the PRPs who
have signed the settlement.

Category 2: Early de_ minimis settlements include:

•   An AOC (Action Name = Admin Order on Consent) signed by the Regional Administrator or delegatee prior to the first
    remedy selection (ROD) at the site, or prior to a subsequent ROD v/hich addresses response costs that are included in the
    settlement. The date the AOC is signed is reported in WasteLAN as the actual completion date (Actual Complete) of the
    AOC (Action Name = Admin Order on Consent).

•   When the Regional Administrator signs the memorandum transmitting the CD (Action Name = Consent Decree) signed
    by the de_ minimis parties and the Regional Administrator to DOJ or HQ prior to the first remedy selection (ROD) at the
    site or prior to a subsequent ROD which addresses response costs that are included in the settlement. The date the CD is
    signed  is  reported in WasteLAN as the actual start date (Actual Start)  of the CD (Action Name - Consent Decree).

The number of signatories to the settlement will be system generated from the identification of the PRPs who have signed the
settlement.

The following information should be entered into WasteLAN for both Category 1 and Category 2 settlements:

•   Enf Instrument Category Selected of De minimis;

•   Law/Section Selected of CERCLA 122(g) or 122(h);

•   PRPs or PRP group that signed settlement (PRPs Associated with Enforcement Instrument or PRP Groups Associated with
    Enforcement Instrument); and

•   Dollar  amount that will be used for future or past work covered by the settlement [Past Costs Achieved and/or Cashout
    Funds Achieved (as applicable)].

To indicate  the de minimis parties that signed the settlement, the following  information must be entered for each party on the
Involvement screen:

•   PRP Involvement Status of "De Minimis Party"; and  .

•   Involvement Type of "Owner", "Generator" or "Transporter".

Changes  in Definition FY 98 - FY 99/00:
The AOC may be signed by  the Regional Administrator or delegatee. An Operator cannot be a de_ minimis  party.  The
WasteLAN data entry instructions reflect the design of the Enforcement Instrument screens.
                                                    C-15                                    My 1, 1998

-------
OS WER Directive 9200.3-14-1E

Special Planning/Reporting Requirements:
See Definition of Accomplishment. This is a GPRA target/annual performance goal.
                                                                   ]          !
Since many de_ minitnis settlements are cashouts, Regions also must enter the Enforcement Instrument Category for "Cashout"
(Enf Instrument Category Selected = Cashout). Dollars received made, minimis cashout settlement should be deposited in an
interest bearing special account. See the Use of Interest Bearing Special Accounts measure for additional information.

The number of signatories to the settlement will be system generated from the identification of the PRPs who have signed the
settlement.
                                                                             !
                                                                   I
                                         '
Regions are requested to provide site-specific targets for de_ minimis settlements.
                                                                   i
See Enforcement Reforms for De Micromis Settlements and Number of Parties.


CASHOUT SETTLEMENTS

Definition:
This measure reports the total number of administrative or judicial settlements where the parties agree to make cash payments
toward future response costs at a site.

Definition of Accomplishment:
Credit is given when:

•   The Regional Administrator transmits the cashout CD (Action Name = Consent Decree) to DOJ or HQ as recorded in
    WasteLAN as the actual start date (Actual Start); or

•   The Regional Administrator or delegatee signs the AOC (Action Name = Admin Order on Consent) for the cashout
    settlement as recorded in WasteLAN as the actual completion date (Actual Completion).

Changes in Definition FY 98 - FY 99/00:
The AOC may be signed by the Regional Administrator or delegatee. The WasteLAN data entry instructions reflect the redesign
of the Enforcement Instrument screens.

Special Planning/Reporting Requirements:
This is a program measure. The Enforcement Instrument Category of "Cashout" (Enforcement Instrument Category Selected
= Cashout and "Cashout Funds Achieved" and "Response Actions Achieved" must be entered into WasteLAN. Dollars received
in a cashout settlement should be deposited in an interest bearing special account.  See the measure, Use of Interest Bearing
Special Accounts, for more information.
July 1, 1998
C-16

-------
                                                                         OSWER Directive 9200.3-14-IE

 SECTION 106,106/107,107 CASE RESOLUTION

 Definition:
 Case resolution is the conclusion of a Section 106, 106/107, or 107 judicial action by full settlement, final judgment, case
 dismissal, or case withdrawal.                                                         •

 Definition  of Accomplishment:
 Credit for case resolution is given when:

 •   A CD is entered in the court and signed by the judge fully addressing the complaint with  all parties; or

 •   The Region receives a memo or letter from DOT withdrawing the case; or

 •   A decision document is submitted by the judge dismissing the case; or

    A trial has concluded and a judgment rendered and signed by the judge fully addressing the complaint.

 The Litigation or case resolution (Action Name = Litigation (Generic), Section 106 & 107 Litigation, Section 107 Litigation,
 or Section 106 Litigation) actual completion date (Actual Complete) is defined as follows:

    Date full settlement CD is entered. This is the actual completion date (Actual Complete) of the CD, SubAction = Entered
    by Court, and the litigation action actual completion date (Actual Complete);   •       , .

 •   Date case is withdrawn (SubAction Name = Case Withdrawn) as the SubAction completion and litigation actual completion
    date (Actual Complete);

    Date case is dismissed (SubAction Name = Case Dismissed) as the SubAction and litigation actual completion date (Actual
    Complete); or

 •   Date judgment is entered (Action Name = Judicial/Civil Judgment) as the judgment and the litigation actual completion
    date (Actual Complete).

 Changes in Definition FY 98 - FY 99/00:
The WasteLAN data entry instructions reflect the redesign of the Enforcement Instrument screens.

Special Planning/Reporting Requirements:
The Outcome Actions Selected or Outcome(s) Selected are entered v/ith the litigation  action. In addition, if the litigation
resulted in a CD or judgment, the "Response Actions Achieved" with their "Estimated Present Worth Value" or Past Costs
Achieved and, if the settlement includes cost recovery, "Response Actions to be Reimbursed," with Future Costs Achieved also
must be entered into WasteLAN with the CD or judgment action. This is a program measure.
                                                   C-17                                   My 1, 1998

-------
OSWER Directive 9200.3-14-IE                                  ;

ADMINISTRATIVE RECORD FOR SELECTION OF RESPONSE ACTION
Definition:
An Administrative Record (AR) is a compilation of all documents EPA used to make a specific decision on the appropriate
response action to be taken at a Superfund site, regardless of whether the document supports or opposes the Agency's selected
action. SARA specifies that such ARs be compiled at sites where responses under remedial or removal authority are planned
or are occurring, or where EPA is issuing a UAO or initiating litigation.

Definition of Accomplishment:
The AR compilation (Action Name = Administrative Records) begins when the letter is signed transmitting the AR to the site
repository and the actual start date (Actual Start) is entered into WasteLAN,

Changes in Definition FY 98 - FY 99/00:
The AR compilation completion definition was deleted.

Special Planning/Reporting Requirements:
This is a program measure.  The start of the compilation of the AR must be reported site-specifically  (Action  Name =
Administrative Records) in WasteLAN. An Action Qualifier indicates whether the AR is for  a remedial or a removal activity
[Qualifier = (E) Admin Record Compiled For a Remedial Event, or (V) Admin Record Compiled For a Removal Event].


ISSUANCE OF DEMAND LETTER

Definition:
A Section 122(e) letter issued from EPA to the PRP requesting that the PRP reimburse the Fund for a specific amount associated
with one or more response activities. Demand  letters are typically sent for each separate response activity.

Definition of Accomplishment:
This SubAction is accomplished on the date (Actual Complete) the demand letter is signeci by the appropriate EPA official and
recorded in WasteLAN as  a SubAction  (SubAction Name = Demand Letters Issued) to the negotiation   actions,
Administrative/Voluntary Cost Recovery action, UAO, Litigation actions, or Decision Documents.

Changes in Definition FY 98 - FY 99/00:
Demand letters is now a valid SubAction for UAOs.
  „                                           I                  !          I                         :

Special Planning/Reporting Requirements:
This is a program measure.


TOTAL COST RECOVERY SETTLEMENTS (INCLUDING DOLLAR VALUE)

Definition:
Total Cost Recovery Settlements is the total  universe of CERCLA enforcement cost recpvery settlements where the parties
agree to pay past costs to the Agency. This measure will require reporting of both the number of settlements as well as the, value
of the past costs to be recovered pursuant to  each of these settlements.
 July 1, 1998
C-18

-------
                                                                          OSWER Directive 9200.3-14-IE
 Definition of Accomplishment:
 Settlements at NPL, NPL-caliber, and non-NPL sites include:

 •   Consent Decrees - Credit is given for CD settlements (Action Name = Consent Decree) for RD/RA with a cost recovery
     component, or CDs for cost recovery only that were not a result from a previous litigation referral, on the date of the
     Regional Administrator's memo transmitting the settlement to DOJ or HQ and recorded in WasteLAN as the actual start
     date (Actual Start).

     For CD settlements that are for cost recovery only and result from a previous litigation referral, Regions should not add
     a start date (Actual Start). Only the lodged (SubAction Name = Lodged by DOJ) and entered (SubAction Name =. Entered
     by Court) SubActions, their actual completion dates (Actual Complete), and the actual completion date (Actual Complete)
     of the CD are recorded. The actual completion date of the CD is the date it is entered by the court.

 •    Administrative Settlements - Credit is given on the date that the Regional office or DOJ receives payment from the PRPs
     in direct response to a demand letter for voluntary cost recovery or the date the Regional Administrator or delegatee signs
     the AOC or Consent Agreement for cost recovery.  The date must be reported in WasteLAN as the actual completion d'ate
     (Actual Complete) of the administrative/voluntary cost recovery (Action Name = Admin/Voluntary Cost Recovery), AOC
     (Action Name = Admin Order on Consent), or Consent Agreement (Action Name - Consent Agreement).

 Total Cost Recovery Settlements will be reported as the combined total of CDs, Consent Agreements, Administrative/Voluntary
 Cost Recovery actions and AOCs where cost recovery has been achieved.

 Changes in Definition FY 98 - FY 99/00:
 An Administrative enforcement instrument may be signed by the Regional Administrator or delegatee.

 Special Planning/Reporting Requirements:
 This is a program measure. The "Costs Achieved" or "Other Activities for Cost Recovery" must be entered into WasteLAN.
 This is measure will be reported in the ENFR-03 report.


 PAST COSTS ADDRESSED > $200,000 VIA SETTLEMENTS, WRITE-OFFS, OR REFERRALS
 [FORMERLY KNOWN AS PAST COSTS ADDRESSED > $200,000]

 Definition:
 Past costs addressed z $200,000 is the decision either to take cost recovery action by use of administrative cost recovery
 settlement, to transmit a Section 106/107 or 107 judicial referral for cost recovery, including settlements for past costs under
 a CD (with no prior litigation referral); to prepare a decision document or 10-point settlement analysis document not to pursue
 cost recovery, or to file a claim in bankruptcy.

 It only covers cases where EPA has incurred costs > $200,000. It is vital to the management of the cost recovery program, that
 sites with upcoming Statute of Limitations (SOLs) be addressed prior to the expiration of the SOL. Therefore, Regions will
 not be allowed to substitute FY 99/00 targeted sites that have SOLs occurring in FY 99/00 or before.

 Definition of Accomplishment:
Administrative Settlements - Credit is given on the date the Regional office or DOJ receives payment from the PRPs in direct
 response to a demand letter for voluntary cost recovery, or the date the Regional Administrator or delegatee signs the AOC or
 Consent Agreement that recovers 100 percent of the Trust Fund expenditures or settles a claim where the total response cost
 are less than $500,000. The accomplishment of the administrative settlement is recorded in WasteLAN as the actual completion
 date (Actual Complete) of the administrative/voluntary cost recovery (Action Name = Admin/Voluntary Cost Recovery), AOC
                                                   C-19
                                                                                           July 1, 1998

-------
OSWER Directive 9200.3-14-IE

(Action Name = Admin Order on Consent), or Consent Agreement (Action Name = Consent Agreement). If the settlement is
compromised and total response costs are more than $500,000, the AOC must be sent to DOI for approval prior to signature
by the Regional Administrator or delegatee.

Section 107 or 106/107 Judicial Referrals - Credit is given on the date of the Regional Administrator's memo transmitting the
referral  to DOJ or HQ [Action Name = Litigation (Generic), Section  107 Litigation, or Section 106 & 107 Litigation] as-
recorded in WasteLAN as the actual start date  (Actual Start).

This includes CD settlements (Action Name = Consent Decree) for RD/RA with a cost recovery component or CD settlements
for cost recovery only that were not the result of a prior litigation referral. Credit is given for these CD settlements on the date
of the Regional Administrator's memo transmitting the settlement to DOJ or HQ and recorded in WasteLAN as the actual start
date (Actual Start).

CD settlements that are for cost recovery only and result from a previous litigation referral do not count towards this
target.  The start date (Actual Start) for these actions is not reported in WasteLAN.  Only the lodged (SubAction Name =
Lodged by DOJ) and entered (SubAction Name = Entered by Court) SubActions, the SubAction actual completion date (Actual
Complete), and the actual completion date (Actual Complete) of the CD are recorded. The actual completion date of the CD
is the date it is entered by the court.

Decision Documents not to Pursue Cost Recovery - Credit is given when the decision document (Action Name = Cost Recvry
Decsn Docmt - No Sue) is signed by the Regional office and recorded in WasteLAN as the actual completion date (Actual
Complete). The decision not to pursue cost recovery also may be documented in a 10-point settlement analysis.  For both the
Cost Recovery Decision Document Not to Sue and the enforcement instrument 10-point settlement analysis, the past costs that
will not be recovered (Past Costs) and the reason the costs were written off should be reported in WasteLAN.

Bankruptcy Filing - Credit is given based on the date that the bankruptcy strategy package is prepared or on the date of the first
creditor committee meeting as documented by the summary of the meeting. These dates are reported in WasteLAN as the
SubAction "Creditors Committee Meeting" and/or "Bankruptcy Strategy Package" actual completion dates (Actual Complete).
These SubActions are entered with the Claim  in Bankruptcy action.  For each Claim in Bankruptcy, the "Past Costs Sought"
must be entered into WasteLAN.

Changes in Definition FY  98 - FY 99/00:
The Regional Administrator or delegatee may sign the administrative settlement document.   The WasteLAN  data entry
instructions  reflect the redesign of the Enforcement Instrument screens. "Response Action Costs Written Off is no longer a
requirement for Decision Document not to Pursue Cost Recovery.

Special Planning/Reporting Requirements:
All dates must be entered into WasteLAN.  Credit for referrals is based on the referral package,  not on the number of sites.
Credit will be withdrawn if a case is returned to the Region by DOJ or HQ for additional work, but will be reinstated upon
 re-referral. For each settlement, the Region  must enter the following information into WasteLAN: " Costs Achieved" or
 "Other Activities for Cost Recovery". For each judicial referral, Regions must enter the following information: "Amount
 Sought" or "Other Activities for Cost Recovery." For each decision not to pursue  cost recovery, the following information
 must be entered: "Past Costs" (Costs Written Off) and Rationale for Cost Write-Off. Accomplishments are reported  on a
 site-specific basis. Any changes to the target require prior approval by the Office of Site Remediation and Enforcement
 (OSRE). This is a GPRA target/annual performance goal.
 July 1,1998                                         C-20

-------
                                                                           OSWER Directive 9200.3-14-1E

 RECOVERABLE PAST COSTS THAT HAVE BEEN ADDRESSED BY PROGRAM TO DATE
 VIA SETTLEMENTS,  WRITE-OFFS, OR REFERRALS [FORMERLY KNOWN AS RECOVERABLE
 PAST COSTS THAT HAVE BEEN ADDRESSED PROGRAM TO DATE]

 Definition:
 This measure supports the goal of Trust Fund Stewardship by reporting the amount and percentage of recoverable past costs
 that were addressed versus all recoverable past costs (i.e., past costs eligible for recovery, program-to-date). The Regions are
 encouraged to address all of the recoverable  past costs through enforcement activities  so that the maximum  amount of
 recoverable funds can be  obtained to support Superfund cleanups.                                                   '

 Recoverable past costs are past costs that are considered potentially recoverable. These costs include EPA direct and indirect
 costs, plus contractor program management costs which are allocated to sites annually.

 Some  Superfund past costs  are considered unrecoverable, including funds  expended  at orphan sites, costs  that were
 compromised during previous cost recovery efforts, and costs that were previously written off.  Indirect costs over and above
 those that are recoverable under the current indirect rates are also considered not recoverable.

 Past Costs Addressed are costs addressed through administrative settlements, Section 107 or 106/107 judicial referrals including
 settlements  for past costs under a CD, decision documents or  10-point settlement analysis documents not to pursue cost
 recovery, or bankruptcy filing. Depending on the enforcement action, the "Past Costs Achieved," "Past Costs Written Off"
 or "Past Costs Sought" must be entered into WasteLAN.

 Recoverable Past Costs include all past costs at the site, regardless of cost recovery status  or previous cost recovery efforts.
 Recoverable costs include direct response costs, indirect costs allocated to the site using the applicable indirect rates, an estimate
 of contractor program management costs as allocated to the site, and any other costs charged to the site, as indicated by the
 Integrated Financial Management System (IFMS) or the Superfund Cost Organization  and Recovery Enhancement System
 (SCORES).

 The percentage of recoverable past costs addressed is the amount of past costs addressed compared to the estimated total amount
 of recoverable past costs.

 Definition of Accomplishment:
 Cost may be addressed through one or more of the following actions:

Administrative Settlements - Credit is given on the date the Regional office or DOJ receives  payment from the PRPs in direct
 response to a demand letter for voluntary cost recovery, or the date the Regional Administrator or delegatee signs the AOC or
 Consent Agreement that recovers 100 percent of the Trust Fund expenditures or settles a claim where the total response cost
 are less than $500,000. The accomplishment of the administrative settlement is recorded in WasteLAN as the actual completion
date (Actual Complete) of the administrative/voluntary cost recovery (Action Name = Admin/Voluntary Cost Recovery), AOC
(Action Name = Admin Order on Consent), or Consent Agreement (Action Name = Consent Agreement).  If the settlement is
compromised and total response costs are more than $500,000, the AOC must be sent to DOJ for approval prior to signature
by the Regional Administrator.

Section 107 or 106/107 Judicial Referrals - Credit is given on the date of the Regional Administrator's memo transmitting the
referral  to DOJ or HQ [Action Name = Litigation (Generic), Section 107 Litigation, or Section  106 & 107 Litigation] as
recorded in WasteLAN as  the actual  start date (Actual Start).
                                                    C-21                                    July 1, 1998

-------
OSWER Directive 9200.3-14-1E

This includes CD settlements (Action Name = Consent Decree) for RD/RA with a cost recovery component and CD settlements
for cost recovery only. For CD settlements for RD/RA with a cost recovery component and CD settlements that were not the
result of prior litigation, credit is given on the date of the Regional Administrator's memo transmitting the settlement to DOT
or HQ. This date is reported in WasteLAN as the actual start date (Actual Start) of the CD (Action Name = Consent Decree).
For CD settlements that are for cost recovery only and result from a previous litigation referral, the actual start date (Actual
Start) is not reported in WasteLAN. Only the lodged (SubAction Name = Lodged by DOJ) and entered (SubAction Name =
Entered by Court) SubActions, the SubAction actual completion date (Actual Complete),  and the actual completion date (Actual
Complete) of the CD are recorded. The actual completion date of the CD is the date it is entered by the court.

Decision Documents not to Pursue Cost Recovery - Credit is given when the decision document (Action Name = Cost Recvry
Decsn Docmt - No Sue) is signed by the Regional office and recorded in WasteLAN  as the actual completion date (Actual
Complete).  The decision not to pursue cost recovery also may be documented in a 10-point settlement analysis. For both the
Cost Recovery Decision  Document Not to Sue and the enforcement instrument 10-point settlement analysis, the past costs that
will not be recovered (Past Costs) and the reason(s) the costs were written off should be reported in WasteLAN.
                                                                       i           i  '
Bankruptcy Filing -  Credit is given based on the date that the bankruptcy strategy package is prepared or on the date of the first
creditor committee meeting as documented by the summary of the meeting.  These dates are reported in WasteLAN as the
SubAction "Creditors Committee Meeting" and/or "Bankruptcy Strategy Package"  actual completion dates (Actual Complete).
These SubActions are entered with the Claim in Bankruptcy action.  For each Claim in Bankruptcy, the "Past Costs Sought"
must be entered into WasteLAN.

Changes in Definition FY 98 - FY 99/00:
 Administrative settlements may be signed by the Regional Administrator or delegatee. The WasteLAN data entry
instructions reflect the redesign  of the Enforcement Instrument screens. "Response Action Costs Written Off is no longer
a requirement for Decision Document not to Pursue Cost Recovery.

Special Planning/Reporting Requirements:
This is a program measure. See Definition and Definition of Accomplishment.


NUMBER AND AMOUNT OF CERCLA PENALTIES ASSESSED

Definition:
This measure supports  the goal of Trust Fund Stewardship by providing information on the amount and  number of final
CERCLA penalties assessed. The measure identifies monies that are provided for the Trust Fund as a result of penalties
assessed for violations  of the CERCLA statute. The measure also supports the systematic reporting on the programmatic
impacts of compliance and enforcement.

This measure is expressed as the dollar amount of the final assessed  penalty under CERCLA. For civil judicial cases, this
amount is the penalty assessed against the defendant(s) as specified in the Consent Decree or Court Order entered by the court
or agreed to by the defendant(s).  For administrative cases, it is the penalty agreed to in the final AOC or assessed directly by
EPA under Section  109(a) and (b) of CERCLA.

The number of CERCLA penalties assessed is the number of civil, judicial, or administrative enforcement actions where a
penalty was assessed under a CERCLA statute.
 July 1, 1998                                        C-22

-------
                                                                        OS WER Directive 9200.3-14-1E

 Definition of Accomplishment:
 •   The number of CERCLA penalties assessed is the total number of enforcement actions (CDs, AOCs, judgements, or court
    orders) where a penalty was assessed under a CERCLA statute, including actions that are only for CERCLA or multi-media
    actions that contain a CERCLA component.

 •   The value of CERCLA penalties assessed is the total dollar amount of penalties assessed under the CERCLA statute for
    violations of requirements contained in civil, judicial, and administrative enforcement actions. If the enforcement action
    consists of multi-media actions, this measure will only include the amount that is assessed under the CERCLA statute, to
    the extent that it can be specified.

 Changes in Definition FY 98 -  FY 99/00:
 Deleted UAOs. WasteLAN data entry instructions reflect the redesign of the Enforcement Instrument screens.

 Special Planning/Reporting Requirements:
 The "Penalty Assessed Amount" should be entered into WasteLAN through the Compliance screens associated with the
 enforcement instrument. The number and value of CERCLA penalties will be obtained from the Office of Compliance using
 information reported in the Enforcement Docket System.  This is a program measure. .



NUMBER AND AMOUNT OF CERCLA SUPPLEMENTAL ENVIRONMENTAL PROJECTS
 (SEPs)

 Definition:
SEPs are environmentally beneficial projects which a violator agrees to undertake in settlement of an enforcement action, but
 which the violator is not otherwise legally required to perform. The SEP could be for public health, pollution prevention,
pollution reduction, environmental restoration and protection, assessments and audits, environmental compliance promotion^
emergency planning and preparedness, or other program-specific projects.

This measure supports the goal of Trust Fund Stewardship by measuring the number and value of SEPs under CERCLA. The
measure provides the opportunity for the violator to undertake environmentally beneficial projects that will potentially prevent
the creation of additional Superfund sites, thus avoiding the need for using Trust Fund monies for future cleanups.  The measure
also supports the systematic reporting on the programmatic impacts of compliance and enforcement.

Definition of Accomplishment:
•   The number of CERCLA SEPs is the total number of cases where a SEP was agreed upon under a CERCLA statute,
    including cases that are only for CERCLA or multi-media cases that contain a CERCLA component.

•   The value of the CERCLA SEPs agreed upon is  the estimated value of the SEP under the CERCLA statute for civil,
    judicial, and administrative enforcement actions. If the action is a multi-media action, the SEP will be the total value for
    all media not just media covered under CERCLA.

Changes in Definition FY 98 - FY 99/00:
WasteLAN data entry instructions reflect the redesign of the Enforcement Instrument screens.
                                                  C-23                                  My 1, 1998

-------
OSWER Directive 9200.3-14-1E

Special Planning/Reporting Requirements:
The following information should be entered into WasteLAN through the Compliance screens associated with the enforcement
instrument:  the SEP "EPA Estimated Value" and SEP "Category."  The number and value of SEPs agreed upon under
CERCLA will be obtained from the Office of Compliance using the information reported in the Enforcement Docket System.
This is a program measure.


COMPLIANCE MONITORING: NONCOMPLIANCE WITH ACTIVE ENFORCEMENT
INSTRUMENT FOR RESPONSE AND ENFORCEMENT ACTIONS [FORMERLY KNOWN AS
NONCOMPLIANCE WITH CONSENT DECREES, ADMINISTRATIVE ORDERS ON CONSENT, AND
UNILATERAL ADMINISTRATIVE ORDERS AND FORMERLY KNOWN AS NONCOMPLIANCE WITH
CONSENT DECREES, ADMINISTRATIVE ORDERS ON CONSENT, AND UNILATERAL ADMINISTRATIVE
ORDERS THAT HAS BEEN ADDRESSED]

Definition:                                         '
This measure identifies the number and  percentage of enforcement  instruments where PRPs  have not complied with a
requirement of the instrument, and where the EPA has either taken no enforcement action, planned enforcement action, or taken
action to address violations. Enforcement instruments include only CDs, AOCs, and UAOs with a response action component.
"Noncompliance" is defined as the PRP being in violation of a provision(s) of an enforcement instrument, or a provision(s) of
an incorporated reference document such as a work plan.

Definition of Accomplishment:
This measure is to be reported on a quarterly fiscal year basis for each type of formal enforcement instrument as follows:

•    Consent Decrees - The number of active lodged CDs (Action Name = Consent Decree) with response action provisions
     (Response Actions Achieved) where the settling PRP has failed or refused to comply with one or more provisions of the
     active entered CD, or with provisions of any other document incorporated by reference (Compliance Status = In Violation -
     No Action Planned, or In Violation - Action Planned, or In Violation - Action Taken). The actual date (Actual Complete)
     the CD is entered (Sub Action Name = Entered by Court) is the earliest date that could trigger the settling PRP's- response
     action obligation. The measure will be reported by fiscal year and quarter (Current FY/Q).

     The following universes will be reported (Regionally and Nationally): a) the number and percentage of active signed CDs
     with response action provisions that qualify as being "In Violation" (Compliance Status = In Violation - No Action
     Planned, or In Violation - Action Planned, or In Violation - Action Taken) calculated relative to the total number of active
     CDs with response action provisions;  b) the number and percentage of active entered CDs with response action provisions
     in violation, where action is taken (Compliance Status = In Violation - Action Taken) calculated relative to the total number
     of active entered CDs with response action provisions where there are  violations (Compliance Status = In Violation - No
     Action Planned, or In Violation - Action Planned, and In Violation - Action Taken).

 •    Administrative Orders on Consent (AOCs) - The number of active signed AOCs (Action Name = Administrative Order
     on Consent)  with response action provisions (Response Actions Achieved) where the PRP has failed or refused to comply
     with any provision of the AOC, or provisions of any other document incorporated by reference ( Compliance Status = In
     Violation - No Action Planned, or In Violation - Action Planned, or In Violation - Action Taken). The date the Regional
     Administrator signs the AOC (Actual Complete) is the earliest date that could trigger the settling PRPs response action
     obligation. The measure will be reported by fiscal year and quarter (Current FY/Q).
 July 1, 1998                                        C-24

-------
                                                                            OSWER Directive 9200.3-14-1E

     The following universes will be reported (Regionally and Nationally): a) the number and percentage of active signed AOCs
     with response action provisions that qualify as being "In Violation"(Compliance Status = In Violation - No Action Planned,
     or In Violation - Action Planned, or In Violation - Action Taken) will be calculated relative to the total number of active
     signed AOCs with response action provisions; b) the number and percentage of active signed AOCs with response action
     provisions in violation, where action is taken (Compliance Status =.In Violation - Action Taken) calculated relative to the
     total number of active signed AOCs  with response action provisions where there are violations (Compliance Status = In
     Violation - No Action Planned, or In Violation - Action Planned, and In Violation - Action Taken).

 •    Unilateral Administrative Orders (UAOs) - The total number of active UAOs (Action Name = Unilateral Administrative
     Order) with response action provisions (Response Actions Achieved) where the PRP has failed or refused to comply with
     any provision of the UAO, or provisions of any other document incorporated by reference (Compliance Status  = In
     Violation - No Action Planned, or In Violation - Action Planned, or In Violation - Action Taken).  The date the Regional
     Administrator signs the UAO (Actual Complete) is the earliest date that could trigger the settling PRPs response action
     obligation. The measure will be reported by fiscal year and quarter (Current FY/Q).

     The following universes will be reported (Regionally and Nationally): a) the number and percentage of active signed UAOs
     with response action provisions that qualify as being "In  Violation" (Compliance Status  =  In Violation - No  Action
     Planned, or In Violation - Action Planned, or In Violation -  Action Taken) will be calculated relative to the total number
     of active signed UAOs with response action provisions; b) the number and percentage of active signed UAOs with response
     action provisions in violation, where action is taken (Compliance Status = In Violation - Action Taken) calculated relative
     to the total number of active signed UAOs with response action provisions where there are violations (Compliance Status
     = In Violation - No Action Planned, or In Violation - Action Planned, and In Violation - Action Taken).

 An enforcement instrument is active until the provisions of the instrument or another document  incorporated by reference is
 completed including payment provisions and monitoring (with the exception of any activity related to record retention). (The
 CD, AOC, or UAO has a Compliance Status of "Closed Order/Settlement".) In addition, a UAO that is converted to a CD is
 no longer active.

 Changes in Definition FY 98 - FY  99/00:
 This measure combines the  two  measures found in the FY 98 SPIM of Noncompliance with Consent Decrees, Administrative
 Orders on Consent, and Unilateral Administrative Orders and Noncompliance with Consent Decrees, Administrative Orders
 on Consent, and Unilateral Administrative  Orders That Have Been Addressed.  WasteLAN data entry requirements reflect the
 redesign of the Enforcement Instrument screens.

 Special Planning/Reporting Requirements:
 This is a program measure.  Regions must enter the Current FY/Q and the Compliance Status for  all enforcement instruments
 on a quarterly basis.  The Compliance Status is based on the compliance status of the individual milestones of the enforcement
 instrument.

The "Response Actions Achieved" for the enforcement instrument must be entered into WasteLAN.

The universes of enforcement instruments where PRPs are in compliance (Compliance Status = In Compliance), in violation
(Compliance Status = In Violation - No Action Planned, or In Violation - Action Planned, or In Violation - Action Taken), or
compliance status is unknown (Compliance Status = Unknown) with respect to the requirements of the instrument, will be
calculated quarterly.
                                                     C-25                                    July 1, 1998

-------
OSWER Directive 9200.3-14-1E
                                                   :                  i   '        '                          :
           FY 99/00 TARGETS AND MEASURES FOR ENFORCEMENT REFORMS
                                                   i                •  !           !                          !
                                                   !              '    !           '
OVERVIEW OF ENFORCEMENT REFORMS

    Over the past several years, EPA's Superfund Enforcement Program has been very successful in reaching settlements with
PRPs and issuing UAOs. PRPs now conduct the majority of cleanups throughout the United States.

    Despite this  success, the Superfund program has been criticized in the past by the Inspector General (IG), General
Accounting Office (GAO), the PRP community, and the general public.  To  improve the Superfund program pending
reauthorization by the U.S.  Congress, EPA has issued three rounds of administrative reforms.  These rounds highlight
enforcement reforms, improved cleanup effectiveness and efficiency, expanded community involvement and environmental
justice, and enhanced State and local government roles in the Superfund program. In October, 1995, EPA issued the third round
of Superfund Reforms. These reforms were intended to assist Regions, State and local governments, communities, and private
parties involved in Superfund cleanups to more easily make cost effective choices that protect human health and environment.
The reforms also sought to increase fairness, reduce transaction costs and help communities to become more involved and
informed during the cleanup decision making phase of the process.

    The initial Measures of Success (MOS) were developed in  FY 96 to address these reform requirements. Additional
measures were added in FY 97 to address the third round of reforms. Two of the measures were identified as targets in FY 98.
These measures seek to provide a more complete picture of enforcement-related  successes and accomplishments at Superfund
sites.

Note:  Information that is in bold and italicized type is currently being translated into discrete, reportable data elements.  It
cannot be reported in WasteLAN as of the  date,of distribution of this manual.


DEFINITIONS OF ENFORCEMENT REFORMS

USE OF ALTERNATIVE DISPUTE RESOLUTION (ADR)

Definition:
This measure reports the number of sites where ADR techniques are employed in an attempt to reach settlement under CERCLA
or to resolve disputes over cleanup standards and Applicable or Relevant and Appropriate Requirements (ARARs). Sites using
ADR tools are divided into two categories: sites where the Agency employs and funds ADR in the CERCLA process; and  sites
where the Agency supports private party use of ADR in the CERCLA process. It does not include cases where the private
parties use ADR without the Agency's support. This measure includes use of ADR in disputes regarding allocation of liability;
in disputes with PRPs regarding alleged noncompliance with a settlement agreement; and in disputes with States and tribes
regarding ARARs and cleanup standards.  This measure will report site-specific use of ADR.

Definition of Accomplishment:
Credit is given for ADR activities when:

•   Allocation of Shares of Responsibility - The parties involved choose a neutral allocator. The date on which the allocator
     is chosen is recorded in WasteLAN as the actual start date (Actual Start) of the Alternative Dispute Resolution action.  The
     ADR type of "Allocation" should also be entered.
 July 1, 1998                                         C-26

-------
                                                                            OSWER Directive 9200.3-14-1E

•   Arbitration- The parties involved in binding or advisory negotiation (in a judicial setting) choose an arbitrator.  The date
    on which the arbitrator is selected is recorded in WasteLAN as the actual' start date (Actual Start) of the Alternative Dispute
    Resolution action.  The ADR type of "Arbitration" should also be entered.

•   Convening - A neutral third party is selected to organize disputants for negotiations, assist them in the decision to use
    ADR, and assist in the selection of an ADR professional. The date on which the neutral third party is selected is recorded
    in WasteLAN as the actual  start date (Actual Start) of the Alternative Dispute  Resolution action.  The ADR type of
    "Convening" should also be entered.

•   Fact Finding - A specialized neutral party with subject matter expertise is selected to resolve technical or factual issues.
    The date that the specialized neutral party is selected is recorded in WasteLAN as the actual start date (Actual Start) of the
    Alternative Dispute Resolution action.  The ADR type of "Fact Finding" should also be entered.

•   Mediation  - The  parties select  a neutral third party with no decision-making  authority to assist during non-binding
    negotiations. The date on which the neutral party is selected is recorded in WasteLAN as the actual start date (Actual Start)
    of the Alternative Dispute Resolution action.  The ADR type of "Mediation" should also be entered.

•   Mini-Trial- The involved parties begin the mini-trial. The  date on which the mini-trial begins is recorded in WasteLAN
    as the actual start date (Actual Start) of the Alternative Dispute Resolution action.  The ADR type of "Mini-Trial" should
    also be entered.

•   Neutral Evaluation - A neutral party is selected to assist  a negotiation team in evaluating the potential for settlement or
    use of ADR professionals. The date on which the neutral party is selected is recorded in WasteLAN-as the actual start date
    (Actual Start) of the Alternative Dispute Resolution action.  The ADR type of "Neutral Evaluation" should also be entered.

•   Settlement Judge - A settlement judge (other than the one hearing the case) is selected (or agreed upon) to act as a mediator
    during the negotiation and settlement discussions of the parties.  The date on which the settlement judge is selected is
    recorded in WasteLAN as the actual start date (Actual Start) of the Alternative Dispute Resolution action.  The ADR type
    of "Settlement Judge" should also be entered.

Changes in Definition FY  98 - FY 99/00:
This measure does not include cases where the private parties  use ADR without Agency support.

Special Planning/Reporting Requirements:
This is a Federal enforcement-lead (FE) activity with an action name of "Alternative Dispute Resolution".  The response actions
being discussed during the ADR process ("Response Actions Selected") and the ADR type are to be entered into WasteLAN.
Credit will be based on the start date (Actual Start) of the ADR (Action Name = Alternative Dispute Resolution). This is a
GPRA measure.


NUMBER OF SETTLEMENTS WHERE EPA SETTLED BASED ON ABILITY-TO-PAY
DETERMINATIONS

Definition:
The measure will help assess the extent to which EPA is using ability-to-pay determinations to achieve its goal of Enforcement
Fairness. The measure will report the number of administrative or judicial settlements that are reached under CERCLA with
PRPs qualified as limited ability-to-pay parties. This type of settlement results in:  (1) PRPs paying less than their respective
portion of the cost for site cleanup based on an ability-to-pay  determination; (2) Payment over time for parties with limited
ability to raise annual revenues; or (3) Parties providing in-kind service in lieu of cash payments.


                                                      C-27                                     July 1,1998

-------
OSWER Directive 9200.3-14-IE

Definition of Accomplishment:
Total ability-to-pay settlements are counted as follows:

•   When an AOC (Action Name = Admin Order on Consent) with the ability-to-pay PRPs is signed by the Regional
    Administrator or delegatee and reported in WasteLAN as the actual completion date (Actual Complete).

•   When the Regional Administrator signs the memorandum transmitting the CD (Action Name = Consent Decree) signed
    by the ability-to-pay parties (and the Regional Administrator) to DOJ or HQ as reported in WasteLAN as the actual start
    date (Actual Start).
                                                                    i           i
Changes in Definition FY 98 - FY 99/00:
The Regional Administrator or delegatee may sign the AOC. WasteLAN data entry instructions reflect the redesign of the
Enforcement Instrument screens.

Special Planning/Reporting Requirements:
The following information should be entered into WasteLAN:
                                                  !                  I           I ,
    An Enforcement Instrument Category Selected of "Ability to Pay";

    "Past Cost Achieved" and "Response Actions to be Reimbursed" or "Other Activities for Cost Recovery"; and/or

    "Cashout Funds Achieved" and "Response Actions Achieved".

This is a GPRA measure.


PROSPECTIVE PURCHASER AGREEMENTS (PPAs)

Definition:
This measure will report progress toward the goals of Enforcement Fairness and redevelopment of contaminated properties.
Redevelopment of contaminated properties is facilitated by providing protection from CERCLA liability to prospective
purchasers of contaminated property.
                                                                               l
This measure counts the total number of AOCs or Consent Agreements that include prospective purchaser provisions.

For EPA to consider entering into a PPA, the agreement must result in: (1) A substantial direct benefit to the Agency in terms
of cleanup or funds for cleanup; or (2) A substantial indirect benefit to the community coupled with a lesser direct benefit to
the Agency.

Definition of Accomplishment:
Credit is given based on the date (Actual Complete) the AOC or Consent Agreement (Action Name = Admin Order on Consent
or Consent Agreement) is signed by the Regional Administrator or delegatee.  Regions also  must enter the Enforcement
Instrument Category to indicate a PPA (Enf Instrument Category Selected = Prospective Purchaser Agreement).

Changes in Definition FY 98 - FY 99/00:
The AOC or Consent Agreement may be signed by the Regional Administrator or delegatee.
July 1, 1998
C-28

-------
                                                                          OSWER Directive 9200.3-14-IE

Special Planning/Reporting Requirements:
For each settlement, the Region should enter the following information into WasteLAN "Estimated Present Worth Value" and/or
"Cashout Funds Achieved" and "Response Actions Achieved;" and/or "Past Cost Achieved", "Response Actions to be
Reimbursed", and/or "Other Activities for Cost Recovery"; and an Enforcement Instrument Category Selected of "Prospective
Purchaser Agreement". This is a GPRA measure.


ISSUANCE OF COMFORT/STATUS LETTERS

Definition:
This measure supports the Superfund Reform goals of brownfields cleanup and redevelopment, by identifying situations where
the Agency can provide information to parties interested in purchasing, developing, or operating on Brownfields properties and
provide some assurance regarding the potential for an EPA action at the property.  Comfort/status letters are intended solely
for informational purposes and only communicate  EPA's intent  with  regard to enforcement or response  authorities.
Comfort/status letters do not provide a release from CERCLA  liability, and therefore, are not considered no action assurances.
The following qualify as comfort/status letters:                                                        '

•   "No Previous Federal Superfund Interest Letter" - is a letter provided to parties when there is no historic proof of
    Superfund Program involvement at the property/site in question.

•   "No Current Federal Superfund Interest Letter" - is provided to parties interested in a property/site which has been
    "archived" and is no longer in WasteLAN; a property/site which has been deleted from the NPL; or a property/site which
    is near, but not within the boundaries of a Superfund site.

•   "Federal Interest Letter" - is provided to parties interested in a property/site where the EPA is either already responding
    in  some manner, or plans to respond in the future.  This  letter also provides language reassuring a party that a particular
    EPA policy, based on the information known to EPA applies to that party's circumstances.

•   "State Action Letter" - is provided to parties interested in a property/site where the state has  the lead for oversight of
    response actions.

Definition of Accomplishment:
A comfort/status letter is accomplished the day it is signed by the appropriate Regional or State Official.

Changes in Definition FY 98 - FY 99/00:
This is a new GPRA measure.

Special Planning/Reporting Requirements:
This is a GPRA measure.  To keep reporting requirements to a minimum, Regions will only be required to enter the number
of comfort/status letters signed.
                                                    C-29                                    July 1, 1998

-------
OSWER Directive 9200.3-14-IE

ORPHAN SHARE - EPA OFFER AND COMPENSATION

Definition:
Definition:
This measure reports on EPA efforts to compensate parties for the portion of the response costs attributable to insolvent and
defunct parties (orphan share).
For negotiations and settlements that include RD/RA or time-critical or NTC removals, this measure will report: 1) the number
of negotiations where EPA offered to compensate for a portion of the orphan share; 2) the Maximum Amount Appropriate for
Compensation (MAAC) under the 1996 Interim Guidance on Orphan  Share Compensation for  Settlers of Remedial
Design/Remedial Action and Non-Time-Critical Removals; 3) the actual amount of compensation offered (could be MAAC
or less than MAAC); 4) the number of settlements where EPA compensated for a portion of the orphan share; and 5) the actual
dollar amount of the orphan shares compensated by EPA.

Orphan share compensation offers are subject to the adequacy of cleanup program funding.  The method for determining the
appropriate compensation to be offered by EPA is provided in the "Interim Guidance on Orphan Share Compensation for
Settlers of Remedial Design/Remedial Action and Non-Time-Critical Removals" dated June 3, 1996.

Definition of Accomplishment:
Credit is given at sites for negotiations where EPA offered to compensate for a portion of the orphan share as follows:
                                                                                i
•   The General Notice Letter (GNL) (for removals), first Special Notice Letter (SNL), or Letter of Eligibility for Orphan
    Share Compensation (for on-going negotiations) is signed by the appropriate EPA official.  This date is reported in
    WasteLAN as the  actual start date (Actual Start)  of negotiations [Action Name =  RD/RA Negotiations, Removal
    Negotiations, or Negotiations (Generic)] and the actual completion date (Actual Complete) of the appropriate SubAction
    (SubAction Name = General Notice Issued, Special Notice Issued, or Eligibility Letter Issued); or
                                                                                i                         ii
•   A Section 122(a) waiver of SNL signed by the appropriate EPA official with the intent to pursue negotiations without
    moratorium procedures. This date is reported in WasteLAN as the actual start date (Actual Start) of negotiations [Action
    Name = RD/RA Negotiations, Negotiations (Generic), or Removal Negotiations] and the actual completion date (Actual
    Complete) of the SNL waiver (SubAction Name = Notice of S 122 Waiver Issued).

Credit is given at sites where EPA compensated for a portion of the orphan share as follows:

•   A CD (Action Name = Consent Decree) and a 10-point analysis for RD or RA is signed  under Section 106,  106/107,
    104(a), or 104(b). The date when the Regional Administrator signs the memorandum transmitting  the CD, signed by the
    parties and the Regional Administrator, to DOJ is reported in WasteLAN as the actual start date (Actual Start); or
                                                .
•   An AOC (Action Name =  Admin Order on Consent) for a time-critical  or NTC removal is signed by the Regional
    Administrator or delegatee. The date on which the AOC is signed is reported in WasteLAN as the actual completion date
    (Actual Complete).  For AOCs that are amended to include a time-critical or NTC removal, the SubAction "Enforcement
    Activity Amended" and the SubAction actual completion date (Actual Complete) must be entered into WasteLAN. To
    signify that the AOC has been amended, the amended  instrument flag (Amended Instrument?) and the "Response Actions
    Added" must be entered.

Changes in Definition FY 98 - FY 99/00:
The AOC may be signed by the Regional Administrator or delegatee. Changes were made to  reflect the  MAAC under the FY
1996 guidance.
July 1, 1998                                        C-30

-------
                                                                         OSWER Directive 9200.3-14-IE

Special Planning/Reporting Requirements:
Orphan share offered compensated settlements is a GPRA measure.  The applicable "Response Actions Achieved," and
"Law/Section Selected" must be entered into WasteLAN. Indicators on the existence of an orphan share at a site include
whether an orphan share package was offered or compensated by EPA, the MAAC, the past costs offered and compensated
by EPA, and the anticipated future costs to be compensated by EPA will be added to WasteLAN.


USE OF INTEREST BEARING SPECIAL ACCOUNTS

Definition:
This measure will help assess the extent to which EPA is able to use Special Accounts under CERCLA Section 122(b)(3)in its
efforts to increase fairness and promote PRP settlements. Special Accounts became interest-bearing in FY 96.  EPA is able to
retain and apply the interest from these accounts to clean up the site at which the settlement occurred.  Funds deposited in
Special Accounts are immediately accessible for response costs, but may only be used to support response actions at the site(s)
covered by the settlement. This type of arrangement gives EPA more flexibility in settling the response costs that performing
PRPs are required to pay and promotes fairness by providing a way for non-performing parties, especially small  parties, to
contribute to the response without long-term involvement. Funds deposited into a special account may be the result of future
costs achieved under de minimis, de micromis, or cashout settlements. Refer to De Minimis Settlements and Number of Parties,
De Micromis Settlements and Number of Parties, and Cashout Settlements for more information.

For all CERCLA settlements where PRPs agree to make cash payments toward future response costs at a site (cash out), the
measure will report the following:

•   The total number of settlements, ,and the amount of future response costs achieved;

•   The number of settlements which designate funds to Special Accounts;

•   The percentage of settlements that also require funds to be deposited in Special Accounts;

•   The amount of funds deposited in Special Accounts; and

•   The percentage of the dollars dedicated to  future work that are deposited in Special Accounts.

Definition of Accomplishment:
This measure counts all settlements where any part of a PRP cash settlement is for future costs as follows:

•   A signed CD (Action Name = Consent Decree) under Section 107 or 106/107 that includes a cashout provision. The date
    on which the Regional Administrator signs the  memorandum transmitting the CD, signed by the parties and the Regional
    Administrator, to DOJ or HQ is reported in WasteLAN as the actual start date (Actual Start); or

•   An AOC or Consent Agreement (Action Name  = Admin Order on Consent or Consent Agreement) that includes a cashout
    provision.  The date the Regional Administrator or  delegatee signs the AOC or Consent  Agreement is reported in
    WasteLAN as the actual completion date (Actual Complete).

WasteLAN will be changed to allow Regions to  indicate that the enforcement instrument includes provisions for establishing
a special account and cashout funds  designated to a Special Account.

The percentages will be calculated as  follows:
                                                    C-31                                   July 1, 1998

-------
 OSWER Directive 9200.3-14-IE

 •   The percentage of cash settlements that contain provisions for payment of future response costs that also require these funds
     to be deposited in Special Accounts is the number of settlements that designate future response costs to Special Accounts
     divided by the number of settlements that contain provisions for payment of future response costs.

 •   The percentage of dollars dedicated to future work that are deposited in Special Accounts is the total dollars in Special
     Accounts under all settlements divided by the total cash out dollars achieved under all settlements that contain provisions
     for payment of future response costs.

 Changes in Definition FY 98 - FY 99/00:
 The administrative enforcement instruments may be signed by the Regional Administrator or delegatee. Identified all the data
 elements that need to be added to WasteLAN for full reporting under this measure. WasteLAN data entry requirements reflect
 the redesign of the Enforcement Instrument screens. Deleted the requirement to enter the Special Account Established
 SubAction.

 Special Planning/Reporting Requirements:
 Data that must be entered into WasteLAN for these settlements include:

 •   Cash Out Funds Achieved;

 •   Enforcement Instrument Category (Enf Instrument Category Selected = Cashout;

 •   Response Actions Achieved; and

 •   Law/Section Selected.

 This is a GPRA measure. The date (Actual Complete) the Special Account is established (SubAction Name = Establish Special
 Account) may be entered as a SubAction to the CD, AOC or Consent Agreement.  This is not an accomplishment requirement.


 ISSUE CLEANUP ORDERS TO PARTIES IN AN EQUITABLE MANNER

 Definition:
 This measure shall support the Superfund Reform goal of enforcement fairness by seeking to ensure reasonable and fair issuance
 of Unilateral Administrative Orders (UAOs) in accordance with the memorandum dated August 2, 1996, which establishes
 procedures for documenting reason(s) for not issuing CERCLA 106 UAOs to certain PRPs. The Agency's policy on who should
 receive UAOs remains that: UAOs should be issued to the "largest manageable number" of PRPs, following consideration of
 the three major factors listed below.

    Evidence of the PRP's potential liability,

    Financially viability of PRP, and

    PRP's contribution  to the site, (e.g., volumetric contribution or contribution in the form of prior work).
July 1, 1998
C-32

-------
                                                                        OSWER Directive 9200.3-14-IE

Definition of Accomplishment:
This measure will include both NPL and non-NPL sites and will report:

•   The number of Unilateral Administrative Orders issued at the site. Credit is given on the date a UAO is signed by the
    Regional Administrator or delegatee for RD/RA, groundwater monitoring activities post ROD, institutional controls, or
    time-critical or NTC removal.  This date is reported in WasteLAN as the actual completion date (Actual Complete) of the
    order (Action Name = Unilateral Admin Order).

•   The total number of parties receiving the UAO.

•   The number of parties excluded from the UAO.

The following information must be entered into WasteLAN:

•   PRPs that were issued the UAO (Parties Associated with Site that were Selected); and

•   Response Actions Achieved under the UAO.

When available in WasteLAN, the PRPs that were excluded from the UAO and one or more of the following reasons why the
PRP was not issued a UAO:

•   Financially Non-Viable;

•   Lack of Evidence;

•   Minor Contributions to Site Conditions;

•   Contributed "Fair Share"; and

•   Manageability Concerns.                                           -

Changes  in Definition FY 98 - FY 99/00:
The UAO may be signed by the Regional Administrator or delegatee. The WasteLAN data entry instructions reflect the design
of the Enforcement Instrument screens.

Special Planning/Reporting Requirements:
This is a GPRA Target/Annual Performance Goal.


DE MICROMIS SETTLEMENTS AND NUMBER OF PARTIES

Definition:
This measure reports the total number of administrative or judicial settlements that are reached solely under Section 122 of
SARA, with PRPs qualified  as de micromis. It is rather unusual in that it measures success inversely. The lower the number
of de micromis settlements, the more successful the Agency's de rnicromis policy.
                                                   C-33                                   July 1, 1998

-------
 OSWER Directive 9200.3-14-IE

 Definition of Accomplishment:
 De micromis settlements include:
                                                                       i
 •    An AOC (Action Name = Admin Order on Consent) signed by the Regional Administrator or delegatee, as reported in
     WasteLAN, as the actual completion date (Actual Complete).

 •    When the Regional Administrator signs the memorandum transmitting the Consent Decree (Action Name = Consent
     Decree), signed by the de micromis parties and the Regional Administrator to DOJ or HQ, as reported in WasteLAN, as
     the actual start date (Actual Start).

 The number of signatories to the settlement will be system generated in WasteLAN from the identification of the PRPs
 associated with the settlement.

 The following information should be entered into WasteLAN:

 •    Enf Instrument Category Selected of De Micromis;

 •    Law/Section Selected of CERCLA 122(g) or 122(h);

 •    PRPs or PRP group that signed settlement (PRPs Associated with Enforcement Instrument or PRP Groups Associated with
     Enforcement Instrument); and

 To indicate the de micromis parties that signed the settlement, the following information must be entered for each party on the
 Involvement screen:

 •    PRP Involvement Status of "De Micromis Party"; and

 •    Involvement Type of "Owner", "Generator" or "Transporter".

 Changes in Definition FY 98 - FY 99/00:
 The AOC may be signed by  the Regional Administrator or delegatee.  Added CERCLA Section 122(h) to the Law/Section
 Selected. WasteLAN data entry instructions reflect the redesign of the Enforcement Instrument screens.

 Special Planning/Reporting Requirements:
 Accomplishments count toward the Superfund Reform "Measures of Success" for de micromis settlements.  While EPA will
 enter into de micromis settlements when requested, the ultimate measure of success of this policy will be that de micromis
 parties are no longer pursued and there is no need to enter into such settlements (see above). This is a GPRA measure.

 Dollars received in a de micromis cashout settlement should be deposited in an interest bearing special account. See the
 measure, Use of Interest Bearing Special Accounts, for more information.

The number of signatories to the settlement will be system generated from the identification of the PRPs associated with the
settlement.

Sec Enforcement Targets and Measures for De Minimis Settlements and Number of Parties.
July 1, 1998                                        C-34

-------
                                                                             OSWER Directive 9200.3-14-IE

PRP OVERSIGHT ADMINISTRATION

Definition:
This measure assesses EPA's efforts to maximize the effectiveness and efficiency of its efforts to oversee PRP activities while
still ensuring that high quality cleanups are conducted by PRPs and that the public's interest is protected.  Successful PRP
oversight administration results from the use of good working relationship practices that may save oversight as well as overall
cleanup time/costs for the Superfund program and PRPs. Good working relationship practices include, but are not limited to:

•   Oversight kick-off meetings at which EPA describes its expectations for PRP performance and oversight;

•   Annual end-of-year discussions during which EPA and PRPs review the past year's oversight activities and discuss future
    work and oversight expectations;

«   Inclusion of States who have an oversight role in oversight discussions to minimize duplication of oversight efforts;

•   Regular communication between PRPs and EPA on the progress of work and the oversight being conducted;

•   Timely communication with PRPs when the level of oversight is increased or decreased and reasons for such changes; and

•   Timely oversight billing to PRPs that includes explanation of oversight activities conducted during the billing period, and
    delineation of EPA's direct in-house costs, indirect costs, extramural site-specific costs, and annual allocation costs.

Meetings on oversight expectations should include, to the extent practicable, discussion of: 1) oversight activities anticipated
during the next billing period; 2) possible oversights costs to be incurred (which should include consideration of projected direct
oversight, State oversight, other enforcement-related, indirect, and annual allocation costs for the site, or an estimate based on
the Region's oversight experience at other sites;  3) PRP feedback about the planned oversight; 4) consideration of other
stakeholder interests; and 5) parameters for EPA decisions to reduce or increase oversight.

The concept of PRP oversight administration extends the scope of the July 31, 1996, OSWER Directive (No. 9200.4-15)
"Reducing Federal Oversight at Superfund Sites with Cooperative and Capable Parties."  This guidance provides criteria for
determining  whether PRPs are  capable and cooperative, and requires Regions to identify  candidate sites for reduced EPA
oversight.

Definition of Accomplishment:
The following site-eligibility criteria should be used-as an initial screen to identify si,tes that are eligible for this measure. Once
sites pass through this initial screen, the Regions will determine whether the sites should participate in  this reform based  upon
the PRPs' cooperativeness and capability, as well as, site-specific criteria. For any site that the Region believes should be
included in this reform but does not meet the following criteria, the Region must document the rationale for including the site.
Sites eligible for this measure should:

•   Be in the removal, RI/FS, RD, RA, or Long-Term Remedial Action (LTRA) phase of cleanup;

•   Be PRP-lead under Federal oversight; and

•   Have an AOC,  CD, or other enforcement document in place that anticipates EPA will bill PRPs during this fiscal year.
                                                       C-35                                     July 1, 1998

-------
 OSWER Directive 9200.3-14-1E
                                                     !                   i.
 The target for this reform is the number of sites for which the Regions will accomplish the following objectives:

     1)  a)   Conduct a kickoff meeting to discuss EPA's expectations for PRP performance and planned oversight activities,
             including cost estimates (required for PRPs newly participating in reform); or

         b)   Conduct an end-of-year discussion with the PRPs on previous and planned oversight activities, including cost
             estimates (required for PRPs continuing to participate in reform); and

     2)  Issue an oversight bill to the participating capable and cooperative PRPs; and
                                                     i'                   I   -        i
     3)  Send a letter to the PRPs documenting EPA's expectations for planned oversight, including any anticipated reductions
         in  oversight costs and/or describing efforts to control/reduce  oversight during the billing period, whichever is
         applicable.

 The date of the accomplishment  for this reform is the latest of the dates documenting completion of each of the actions.  In
 exceptional circumstances (e.g.,  the Region does not have  an enforceable agreement to bill the PRPs for oversight or the
 agreement specifies that the oversight bill will be issued at the end of the project, which will occur in a later fiscal year), the
 Region may document its rationale to achieve the accomplishment without sending a bill to the PRPs during the calendar year.

 Changes in Definition FY  98 - FY 99/00:
 None.

 Special Planning/Reporting Requirements
 For sites included in this measure during FY 99/00, Regions will use a manual reporting form, to be provided by Headquarters,
 for reporting achievement of the accomplishment.

 In addition to providing documentation to achieve the accomplishment of this reform, the Regions should also document to the
 file any decision,  including the rationale, for terminating a PRP's participation in this reform.  This is a program measure.
July 1, 1998                                          C-36

-------
                                    OSWER Directive 9200.3-14-IE
           EXHIBIT C.2(l OF 5)
ENFORCEMENT PLANNING REQUIREMENTS
Planning Requirements
*s?
4
GPRA Target/Annual
Performance Goal?
GPRA or Program
Measure/Target?
Planned Site-Specifically?
Planned/Reported on
Operable Unit or Whole
Site Basis?
Reported Site-Specifically
or in non-Site Specific
Portion of WasteLAN?
AOA Category, if Fund-
Financed?
AOA Category for
Oversight?
Basis for AOA?
, PRPSear^li
*; ..Starts '
// ff t f
••*T
-
Program
Measure
Yes
Whole Site
Site-Specific
Enforcement
N/A
Site-Specific
Plans
PRPSeiircHr
Completions
-
Program
Measure
Yes
Whole Site
Site-Specific
N/A
N/A
N/A
Section 104(e)
Letters Issued
: i' ' ' -
* .
> , * ./ ,„" "&
-
Program
Measure
No
Whole Site
<&
Site-Specific
N/A
N/A
N/A
y" Receipt of;
. Responses for -
Section 104(e)
* Betters /,
-
Program
Measure
No
Whole Site
Site-Specific
N/A
N/A
N/A
Section 104(e^
Referrals and
Orders Issued
*. * ^ £"v J ^
-
Program
Measure
No
Whole Site
Site-Specific
Enforcement
N/A
Site- or non-Site
Specific Plans
                  C-37
July 1, 1998

-------
 OSWER Directive 9200.3-14-IE
                                     EXHIBIT C.2 (2 OF 5)
                          ENFORCEMENT PLANNING REQUIREMENTS
Planning Requirements
GPRA Target/Annual
Performance Goal?
GPRA or Program
Measure/Target?
Planned Site-Specifically?
Planned/Reported on
Operable Unit or Whole
Site Basis?
Reported Site-Specifically
or in non-Site Specific
Portion of WasteLAN?
AOA Category, if Fund-
Financed?
AOA Category for
Oversight?
Basis for AOA?
Issuance of
General Notice
Letters
-
Program
Measure
No
Operable Unit
Site-Specific
N/A
N/A
N/A
Issuance of
Special
Notice"
Letters' J '
-
Program
Measure
No
Operable
Unit
Site-Specific
N/A
N/A
N/A
ESI/RI/FS
Negotiation
Starts
-
Program
Measure
Yes
Operable Unit
Site-Specific
Enforcement
N/A
Site-Specific
Plans
RD/RA
Negotiation
Starts
-
GPRA
Measure
Yes
Operable Unit
Site-Specific
Enforcement
N/A
Site-Specific
Plans
Completion or
Termination of
Negotiations for
RD/RA
-
GPRA
Measure
Yes
Operable Unit
Site-Specific
N/A
N/A
N/A
July 1, 1998
C-38

-------
                                   OSWER Directive 9200.3-14-1E
           EXHIBIT C.2 (3 OF 5)
ENFORCEMENT PLANNING REQUIREMENTS
Planning Requirements
f>f*
" /
f > c i "
GPRA Target/ Annual
Performance Goal?
GPRA or Program
Measure/Target?
Planned Site-Specifically?
Planned/Reported on
Operable Unit or Whole
Site Basis?
Reported Site-Specifically
or in non-Site Specific
Portion of WasteLAN?
AOA Category, if Fund-
Financed?
AOA Category for
Oversight?
Basis for AOA?
Completion or
Termination of
Negotiations
for Cleanup '
(RD/RA,
Removals, and
Other) '
-
Program
Target
Yes
Operable Unit
Site-Specific
N/A
N/A
N/A
Slate Orders
for
, ESI/RI/FS
,//
- •
Program
Measure
No
Operable
Unit
Site-Specific
N/A
-N/A ,
N/A
State Consent
Decrees for
; RD/RA ; ,
t j
-
Program
Measure
No
Operable Unit
Site-Specific
N/A
N/A
N/A
Total
- Response , ,
' Commitments ^
_ (Including
DoUar Value)
Yes
-
Yes
Operable Unit
Site-Specific
Enforcement
N/A
Site-Specific
Plans
De Minimis
Settlements and
Number of
Parties
Yes
-
Yes
Operable Unit
Site-Specific
Enforcement
N/A
Site-Specific
Plans
                 C-39
July 1, 1998

-------
OSWER Directive 9200.3-14-IE
                                     EXHI)BITC.2(40F5)
                          ENFORCEMENT PLANNING REQUIREMENTS
Planning Requirements
GPRA Target/Annual
Performance Goal?
GPRA or Program
Measure/Target?
Planned Site-Specifically?
Planned/Reported on
Operable Unit or Whole
Site Basis?
Reported Site-Specifically
or in non-Site Specific
Portion of WasteLAN?
AOA Category, if Fund-
Financed?
AOA Category for
Oversight?
Basis for AOA?
Cash Out
Settlements
-
Program
Measure
Yes
Operable Unit
Site-Specific
Enforcement
N/A
Site-Specific
Plans
Section 106,
106/107, 107
Case
Resolution
-
Program
Measure
No
Operable
Unit
Site-Specific
N/A
N/A
N/A
Administrative
Record for
Selection of
Response
Action
-
Program
Measure
No
Operable Unit
Site-Specific
Enforcement or
Other Response
N/A
Site- or non-
Site Specific
Plans
Issuance of
Demand
« Letter
-
Program
Measure
No
Operable Unit
or Whole Site
Site-Specific
N/A
N/A
N/A
Total Cost
Recovery
Settlement
(Including
Dollar Value)
Yes
Program
Measure
Yes
Operable Unit or
Whole Site
Site-Specific
Enforcement
N/A
Site-Specific
Plans
July 1, 1998
C-40

-------
                                                                     OSWER Directive 9200.3-14-IE
                                         EXHIBIT C.2 (5 OF 5)
                             ENFORCEMENT PLANNING REQUIREMENTS
Planning Requirements
GPRA Target/Annual
Performance Goal?
GPRA or Program
Measure/Target?
Planned Site-Specifically?
Planned/Reported on
Operable Unit or Whole
Site Basis?
Reported Site-Specifically
or in non-Site Specific
Portion of WasteLAN?
AOA Category, if Fund-
Financed?
AOA Category for
Oversight?
Basis for AOA?
Past Costs
Addressed >
$200kvia */
Settlements,
Write-Offs, or
Referrals
//
v/ /
^ - -,
Yes
-
Yes
Operable Unit
or Whole Site
Site-Specific
Enforcement
N/A
Site-Specific
Plans
Recoverable
Past Costs -
That Have
Been
Addressed
by Program
to Date Via
Settlements,
Write-Offs,
or Referrals
-
GPRA
Measure
No
Operable
Unit or
Whole Site
Site-Specific
N/A
N/A
N/A
Number and
Amount *of
CERCLA^,
- Penalties
Assessed
* /
*t
"- ''\
" *', -
-
Program
Measure

Operable Unit
Site-Specific
N/A
N/A
N/A
Number and
'- Amount of
CERCLA
Supplemental
Environmental
Projects
'(SEPs)

-------
 OSWER Directive 9200.3-14-IE
                                           This Page Intentionally
                                                 Left Blank
July 1, 1998                                         C-42

-------
                                             OSWER Directive 9200.3-14-E
Superfund/Oil Program Implementation Manual FY 99/00




             Appendix D: Federal Facilities
                                                         July 1, 1998

-------
OSWER Directive 9200.3-14-E
                                        This Page Intentionally
                                              Left Blank
July 1, 1998

-------
                                                                         OSWER Directive 9200.3- 14-E

                                            Appendix D
                                         Federal Facilities

                                         Table of Contents

FEDERAL FACILITIES PRIORITIES	 D-1
        Overview	 D-1
        Superfund Federal Facility Goals and Priorities	.'	 D-1

               Strategic Federal Facility Goals	 D-1
               Streamlining Federal Facilities Cleanup and Oversight	 D-2

        RCRA Activities at Federal Facility NPL Sites	 D-3
        BRAC Budget and Financial Guidance	 D-3

               Resources and Tracking Mechanisms  	 D-3
               Accountability for Resources	 D-4

FACILITIES FY 99/00 TARGETS AND MEASURES	 D-7

        Overview of FY 99/00 Federal Facilities Targets and Measures	 D-7

               Reporting of Non-NPL Federal Facilities Data	 D-7

        Federal Facilities Definitions	 D-9

               Base Closure Decisions	 D-9
               Federal Facility Agreement (FFA)/Interagency Agreement (IAG) Starts	 D-9
               FFA/IAG Completion	  D-10
               Federal Facility Dispute Resolution	  D-10
               Use of Supplemental Environmental Projects (SEPs)	  D-11
               Remedial Investigation/Feasibility Study (RI/FS) or RCRA Facility
               Investigation (RFI) Starts	:	  D-11
               Feasibility Study (FS), Corrective Measure Study (CMS), or EE/CA Starts	  D-12
               Decision Documents  	: ...	  D-12
               Duration of ROD to IAG Negotiation Completion  	  D-13
               Remedial Action (RA) or RCRA Corrective Measure Implementation (CMI) Starts	  D-13
               Timespan from ROD Signature to RA Start  	  D-14
               RA or CMI Completions	  D-14
               Removal or RCRA Interim/Stabilization Measure (ISM) — Starts and Completions	  D-15
               NPL Site Construction Completions	  D-16
               Federal Facility Five-Year Reviews	  D-22
               Federal Facility Partial NPL Deletion	  D-22
               Federal Facility Final NPL Deletion 	  D-23
                                                                                          July 1, 1998

-------
OSWER Directive 9200.3- 14-E
                                               i                  '          i
                                                                           I
                                          Appendix D
                                       Federal Facilities

                                  Table of Contents (Cont'd)

       Community Involvement Definitions	,	  D-27

               Community Involvement Plan	  D-27
               Information Repository 	  D-27
               Public Meeting	  D-28
               Restoration Advisory Boards/Site-Specific Advisory Boards (RABs/SSABs)	  D-28
               Technical Assistance Grants (TAGs)	  D-29
               Technical Outreach Services for Communities (TOSC) 	  D-29
July 1, 1998

-------
                                                               OSWER Directive 9200.3-14-E


                                     Appendix D
                                   Federal Facilities

                                    List of Exhibits

EXHIBIT D.I  FEDERAL FACILITIES ACTIVITIES	 D-8

EXHIBIT D.2  FEDERAL FACILITIES PLANNING REQUIREMENTS  	  D-25
                                                                            July 1, 1998

-------
OSWER Directive 9200.3-14-E
                                        This Page Intentionally
                                              Left Blank
 July 1, 1998

-------
                                                                            OSWER Directive 9200.3-14-E
                                            APPENDIX D
                              FEDERAL FACILITIES PRIORITIES
OVERVIEW
    To manage the Superfund Federal facilities program, the Federal Facilities Enforcement Office (FFEO) and the
Federal Facilities Restoration and Reuse Office (FFRRO) use the Federal Facilities Leadership Council (FFLC) to help
identify and resolve issues unique to the management of EPA's Federal facility program.  The FFLC is comprised of
Superfund  and/or  the  Resource Conservation  and Recovery  Act (RCRA) program and  enforcement/counsel
representatives from all Regions, as well as representatives from the Federal facilities Headquarters (HQ) offices and
other HQ offices that handle Federal facilities issues. The FFLC is currently co-chaired by FFEO, FFRRO, Region 3,
(lead region for Superfund Federal facilities), and Region 1  (lead Region for Base Realignment and Closure (BRAC)
program). The FFLC provides a forum for policy advice and direction on various Federal facility program issues.

    Federal agencies conducting the cleanups have seen their budgets level out or reduced over the last few years. The
FY 99 Department of Defense's (DoD) cleanup budget request is approximately $1.6 billion —not accounting for work
at Base Closing installations, and the FY 99 Department of Energy's (DOE) environmental management budget request
is about $6.1 billion. Cleanups performed under the authority  of the Comprehensive Environmental Response,
Compensation, and Liability Act (CERCLA) comprise about 25 percent of DOE's budget, while Waste Management
activities—many of which are CERCLA-like—encompass greater than 50 percent of DOE's budget.  Other Federal
agencies' budgets are considerably smaller.

    With the latest round of Base Realignment and Closure (BRAC 95), there are now approximately 108 Fast Track
Cleanup Bases where EPA supports the DoD cleanup and transfer process.  For FY 99, DoD provided approximately
$13 million to fund 141 Full Time Equivalent (FTE) positions and related support.  Comparatively speaking, this
program is 75 percent the size of the Superfund Federal facilities program, excluding the contracts base. While FFRRO
has provided specific program implementation guidance for EPA's BRAC Fast Track Program, several of these program
management components are reiterated below.


SUPERFUND FEDERAL FACILITY GOALS AND PRIORITIES

Strategic Federal Facility Goals

    Superfund Federal facilities activities have high visibility because of the significant threats posed by military and
weapons sites, the impact of military base closings, the resources needed to implement DoD/DOE cleanup efforts at
facilities listed on the NPL and other non-NPL facilities, and heightened State, tribal and other stakeholder interests.
Federal facilities program goals for FY 99/00 are based on a number of related factors, including overall Superfund
program  community  involvement goals,  anticipated  resource constraints, Congressional interest,  and statutory
requirements. Program activities and resources should be planned to achieve the following goals of the Federal facilities
program's strategic plan:

•       Involving Citizens in Environmental Decision Making - The publication of the Final Report of the Federal
        Facilities Environmental Restoration Dialogue Committee in April 1996 was a watershed event for public
        involvement in Federal facility cleanups. As a result of'the report, Federal  agencies are now actively forming
        Restoration Advisory Boards (RABs) at DoD installations and Site Specific Advisory Boards (SSABs) at DOE
        facilities. Other Federal agencies are also starting to form advisory boards.  EPA Regional and HQ programs
        need to continue  to promote the  formation of citizen advisory boards at NPL facilities and support, where
        requested, the boards. As facility circumstances vary, the level of support will vary as well. Regional staff and
        management are expected to be especially sensitive to the requests at NPL facilities and at the BRAC Fast Track
        facilities. Because of resource constraints, participation and support for non-NPL facilities is expected to be
        minimal. In addition, since many of the communities surrounding the Federal facilities are communities of
        color, low-income, and have been historically politically and economically disenfranchised, Regions should give

                                                  D-l                                        July 1,  1998

-------
OSWER Directive 9200.3-14-E
                                                 i                    :           j
        close scrutiny to environmental justice issues at the NPL Federal facilities. Regions need to work closely with
        State agencies and their Federal counterparts to ensure that the President's Executive Order on Environmental
        Justice is successfully carried out (E.O. 12898).

•       Enforcing the Laws - The public needs to know that it will be protected from environmental hazards through
        vigorous enforcement by the EPA and the States for violations of environmental laws and situations that put
        people and natural resources at risk. EPA intends to use its Federal facility enforcement authorities not only
        to compel compliance, but also to promote long-term policy objectives such as greater citizen involvement,
        pollution prevention, technology development, and natural resource management.
                                                 !     ,               i
•       Preventing Pollution - Focus on pollution prevention solutions at the source instead of "at the end of the pipe."
        Investing in pollution prevention saves money, minimizes environmental liability, and provides legitimate relief
        from operating under onerous pollution control regulation.  Executive Order 12856, signed by President Clinton
        on August 3, 1993, requires Federal agencies to develop comprehensive pollution prevention strategies and seek
        to reduce by 50% their emissions of toxic chemicals or toxic pollutants by 1999.

•       Implementation of the Base Closure Five Point Plan -  Pursuant to the Congressional mandate, numerous
        military bases are undergoing realignment or complete closure, with the potential for severe economic impacts
        on the affected local communities. Rapid redevelopment and job creation are the top goals of this community
        reinvestment program, commonly referred to as  the "Five Point Plan."  The  program calls for the Federal
        government to give priority to local economic redevelopment, provide transition  and redevelopment assistance
        to workers and communities, put cleanup on a Fast Track, provide transition coordinators at major bases
        scheduled for closure or substantial realignment, and allocate more funds for economic development planning
        grants.

•       Establishing BRAC Cleanup Teams - Environmental experts from EPA, DoD, and the State, working as a
        team, will  be assigned  to BRAC bases identified  by DoD as Fast Track Cleanup sites, i.e.,  bases with
        environmental contamination where property will be available for transfer to a community. Decision making
        authority will be placed at the lowest practical level within each organization, and team members will be
        empowered to make decisions to expedite  the process. The teams will conduct  "bottom-up" reviews of the
        environmental conditions of the base, with the objective of accelerating cleanup while integrating base reuse
        priorities.

Streamlining Federal Facilities Cleanup and Oversight
                                                 i                    i
    Considerable progress has been made in streamlining the cleanup and oversight processes at Federal facilities. FY
99/00 will see continued efforts in this area. To adequately address environmental issues  while continuing streamlining
and downsizing activities, the following directions were formed to aid in appropriate program management:

•       Lead Regulator - This guidance  was issued  on November  7,  1997.  It  complements RCRA/CERCLA
        integration guidance and provides the framework for EPA Regions to work closely with their State counterparts
        to eliminate or minimize overlapping regulatory jurisdictions (RCRA or CERCLA) and establish, to the extent
        practicable, a lead  or sole regulator at a site.

        Because the overall goal of the Administration is to build  partnerships with the States and have them assume
        a greater role in protecting human health and environment, Regions should work closely with their States to
        have them assume a greater lead at Federal facility NPL sites where they have  the capacity, desire, and the
        ability  to do so.  We recognize that each facility has a  unique set of circumstances, but we are expecting
        Regional program offices to make a bona fide effort to work through the lead regulator and oversight issues with
        their State counterparts.
July 1, 1998                                        D-2

-------
                                                                              OSWER Directive 9200.3-14-E

         The guidance recommends that the process focus on up-front scoping and identification of what is actually
         needed with a bias for document reduction. In general, less documentation should be required at sites that are
         less complicated, sites that are using presumptive remedies, and sites  where EPA, the States and external
         stakeholders believe that less oversight is required.

 •       Prioritization - This guidance is expected by the end of FY 98. DoD Services and DOE have developed
         schemes to prioritize site activities based on risk and other factors.  EPA needs to work with other Federal
         agencies, States and outside stakeholders to ensure that the most important activities are being addressed. As
         budgets are established on an annual basis, Regions should begin to develop approaches for annual review and
         consider adjusting milestones based on Federal budget constraints,  new site information, cleanup progress, and
         other factors.

     There is an important caveat to prioritization. EPA and the States are not bound to absolutely follow the results
 of DoD's relative risk model or DOE's qualitative risk evaluation model in establishing milestones; they should
 only be used to consider the outcomes in setting priorities.  Both DOE's and DoD's approaches for priority setting
 call for active regulatory and stakeholder involvement. They also call for the explicit consideration of other factors such
 as existing enforceable agreements, community interest, environmental justice, and project implementation efficiencies.
 If a particular facility or installation is championing a "lock-step" adherence to their model's outcome, Regions should
 first work to resolve the issue at the site level; however, if there is no progress, Regions need to bring such situations to
 the attention of HQ. Based on Regional information, we have identified bases that have misinterpreted DoD guidance
 and corrections have been made.

     Regions should continue to strive to place these priorities and project milestones in enforceable Federal Facility
 Agreements(FFAs)/lnteragency Agreements (lAGs) at NPL sites. FFAs and  lAGs should be viewed as living, dynamic
 documents reflecting not only the best judgments by all parties  of cleanup priorities and milestones at the time of
 agreement, but also that reflect the changing circumstances of environmental cleanup.  Regions should consider adding
 into either existing or new FFAs/IAGs the process for annual review and consider adjusting enforceable milestones.


 RCRA ACTIVITIES AT FEDERAL FACILITY NPL SITES

     EPA has long  recognized that because most of the  Federal facilities  sites are also active facilities, RCRA
 requirements may also apply to certain site cleanup activities. Regions must strive to eliminate RCRA/CERCLA
 duplications wherever appropriate.  To get a better overall picture of a facility's cleanup activities, FFRRO has
 integrated into the Government Performance and Results Act (GPRA) and program measures several RCRA activities
 that are generally analogous with CERCLA activities.  They include: RCRA Facility Investigation (RFI); Corrective
 Measures Study (CMS); Corrective Measure Design (CMD); Interim/Stabilization Measure (ISM); and Corrective
 Measure Implementation (CMI).  FFEO has already accomplished a similar exercise through  the Federal Facility
 Tracking System.


BRAC BUDGET AND FINANCIAL GUIDANCE

 Resources and Tracking Mechanisms

    Program management guidance is included in the BRAC Fast Track guidance.  Beginning in FY 94, DoD provided
EPA, via an interagency funding agreement, with reimbursable resources to support EPA's cleanup activities.  DoD,
EPA, and the Office of Management and Budget (OMB) worked together to develop the details of this agreement, which
included 100 additional reimbursable work years for EPA and $7 million starting in FY 94. In early FY 96, EPA reached
agreement with DoD to fund EPA support for BRAC 4 (1995) installations designated as Fast Track Cleanup sites. As
a result, interagency funding agreement for BRAC rounds 1, 2, 3 and 4 extends from FY 94 through FY 2000, and totals
$13 million to fund  141 workyears forFY98.
                                                                                             July 1, 1998

-------
OSWER Directive 9200.3- 14-E

    The majority of EPA's Fast Track resources (92 percent) are invested in the Regions.  Regional personnel provide
technical assistance and guidance to DoD and States at Fast Track Cleanup sites.  EPA uses Base Closure funding for
EPA personnel that participate on BRAC Cleanup Teams as either the EPA designated team member or as technical
experts and support personnel that assist the teams. EPA relies upon in-house expertise; no BRAC funds are used for
contractor support.

    Regions are allocated, via a workload model, work years and personnel, travel, and administrative funding.  The
level of EPA support varies depending on Regional and base specific circumstances. (EPA's base closure workload
model takes into account relevant data to assess the environmental condition and economic status of a Fast Track site.)

    The Agency monitors these DoD reimbursable resources via the Office of the Comptroller's (OC) Integrated
Financial Management System (IFMS), which tracks HQ and Regional expenditures separately for each BRAC round.
EPA utilizes site-specific charging to track resource utilization back to actual site work. This separate tracking of BRAC
round expenditures is required by BRAC legislation. EPA reports quarterly on their utilization to DoD and annually to
the OMB.  [OC, Financial Management Division (FMD), Cincinnati, Ohio invoices DoD on actual program obligations
incurred by EPA.]

    HQ receives regular program activity reports from the Regional offices, every two months, on the progress of work
at all Fast  Track installations. These reports are generated by the EPA Regional BRAC Cleanup Team personnel and
provide HQ and DoD with pertinent program and personnel information related to cleanup and reuse. The OC Budget
Division also proyides  FFRRO with a monthly "BRAC Utilization Report" generated from their agency-wide Resource
Management Integration System (RMIS).

    This RMIS report  details the status of expenditures by the Regional Base Closure resources, work years, personnel,
travel, and administrative funding. This reporting is done for overall program management purposes and to track
resource expenditures in each BRAC round.  Regional Waste Management Directors are provided copies of the reports
and are expected to monitor the use of all BRAC resources within their respective Region.

Accountability for Resources

    BRAC reimbursable work years and funding must be used only for EPA related military Base Closure activities.
Military Base Closure activities are activities related to Fast Track Cleanup  of specific bases identified by the Office of
Solid Waste and Emergency Response (OSWER) (in consultation with DoD).  These activities include: accelerating the
identification of clean parcels under the Community Environmental  Response Facilitation Act (CERFA); developing
BRAC Cleanup Plans (BCP); promoting community involvement in cleanup decision-making; preparing and reviewing
site documents [e.g., BCP, Environmental Baseline Survey (BBS), RI/FS, RODs, RD, and RAs] and RCRA documents
(e.g., RFI Starts, CMD Starts, and ISM  Starts and Completions); studying  and sampling  field data; National
Environmental Protection Act (NEPA) review and analysis; assisting DoD or States with BRAC site issues; and activities
supporting EPA personnel participation in Fast Track Cleanup.  These activities are outlined in the Memorandum of
Understanding between EPA and DoD dated February 3, 1994, and subsequent memorandums and guidance related to
EPA BRAC resources.

     As the signatory and executing agent for the reimbursable agreement with DoD, the Assistant Administrator for
OSWER (AA  SWER)  will rely on Regional Administrators and, as the primary focus of the EPA BRAC resources, the
Regional RCRA/Superfund National Program Managers to ensure reimbursable costs are accurate and appropriate. Each
Region should identify an individual in the appropriate division that  will coordinate the Regional BRAC program and
resources, and can act as a day-to-day liaison with OSWER and DoD. FFRRO, within OSWER, will provide the AA
SWER with programmatic and financial reviews of specific Regions. Reprogramming of "funds submitted to the OC
require notification of FFRRO for their approval.

     HQ and Regional  personnel utilizing BRAC resources should receive authorization from their appropriate EPA HQ
or Regional senior managers and  use the established BRAC budget program. The EPA Remedial Project Manager
(RPM) and the support team are empowered  to make decisions locally to the maximum  extent possible.  EPA has
delegated certain authorities to the Regional Administrators (e.g., CERFA concurrence), who have in turn redelagated

July 1,  1998                                        D-4

-------
                                                                            OSWER Directive 9200.3-14-E

the authorities to other levels within their organizations.  Regional personnel should be familiar with their internal
delegation of authorities.  Should the need arise, the RPM and support team will have the ability to raise issues
immediately to senior EPA officials for resolution.

    EPA Regional Superfund or RCRA Divisions, in conjunction with the Office of Regional Counsel, Regional NEPA
teams, State environmental regulatory agencies, and DoD, will form a BRAC Cleanup Team (BCT) for each base
designated by DoD as a Fast Track base. The BCT will be comprised of one representative from the EPA Region, one
representative from the State, and one representative from DoD. The BCT will serve as the primary forum in which
issues affecting the execution of cleanup to facilitate reuse will be addressed.

Note: Additional specific BRAC information can be found in the Fast Track Program Guidance.
                                                  D-5                                       My 1, 1998

-------
OSWER Directive 9200.3-14-E
                                        This Page Intentionally
                                              Left Blank
July I, 1998
D-6

-------
                                                                           OSWER Directive 9200.3-14-E

              FEDERAL FACILITIES FY 99/00 TARGETS AND MEASURES

OVERVIEW OF FY 99/00 FEDERAL FACILITIES TARGETS AND MEASURES

    The Superfund Comprehensive Accomplishments Plan (SCAP) is used by the AA SWER, Assistant Administrator
for OECA (AA OECA), and senior Superfund managers to monitor the progress each Region is making towards
achieving the GPRA targets and annual performance goals.  In addition, SCAP will continue to be used as an internal
management tool to project and track activities that contribute to these GPRA goals and support resource allocation.
The program will  set national goals based on historical performance and performance expectations within a limited
budget for the performance goals in GPRA and track accomplishments in the activities contributing to those goals.
Regions should continue to plan and report accomplishments in  WasteLAN as they have traditionally.

    To more clearly  reflect the relationship between GPRA and the SCAP process, targets (GPRA targets/annual
performance goals) and measures (GPRA and program measures) are defined as follows:

•   GPRA Targets/Annual Performance Goals are a subset of the overall planning and budgeting information that
    has traditionally been tracked by the Superfund program offices.  They are numerical goals that are established
    nationally prior to the start of the operating year; for example, 136 construction completions at Superfund
    National Priorities List (NPL) sites in FY 99.

•   Measures are activities deemed essential to tracking overall program progress. There are two types of measures:
    GPRA measures and program measures. GPRA measures simply track the number of actions that occur
    throughout the year (accomplishments) and are used to evaluate program progress; for example, the number of
    agreements negotiated with States and Tribes. Program measures are used to project the number of actions that
    each Region expects to perform during the year using anticipated resources; for example, the number of sites
    where EPA settled based  on ability to pay determinations.

    The  following pages contain, in pipeline  order, the definitions  of the  FY 99/00 Federal facilities  targets and
measures.  Exhibit D. 1 displays the full list of Federal facilities activities that are defined in the  remainder of the
Appendix, and identifies the FY 99/00 targets and measures.  Exhibit D.2, at the end of this Appendix, describes the
planning requirements for Federal facilities activities.

    Community Involvement  requirements for Federal facilities  have been included at the end of this appendix.

Reporting of Non-NPL Federal Facilities Data

    Regions  are responsible for entering data into WasteLAN for non-NPL Federal facility sites, especially the BRAC
Fast Track Sites.
                                                 D-7                                       July 1, 1998

-------
OSWER Directive 9200.3-14-E
                                         EXHIBIT D.I
                              FEDERAL FACILITIES ACTIVITIES
ACTIVITY
Base Closure Decision
FFA/IAG Starts
FFA/IAG Completions
Federal Facility Dispute Resolution
Use of Supplemental Environmental Projects (SEPs)
RI/FS or RCRA Facility Investigation (RFI) Starts
FS or Corrective Measure Study (CMS) or EE/CA Start
Decision Documents
Duration of ROD to IAG Negotiation Completion
RA or Corrective Measure Implementation (CMI) Starts
Timespan from ROD Signature to RA Start
RA or CMI Completion
Removal or RCRA Interim/Stabilization Measure (IMS)
Starts & Completions
NPL Site Construction Completions
Federal Facility Five- Year Reviews
Federal Facility Partial NPL Deletion
Federal Facility Final NPL Deletion
/
GPRA
Target/Annual
Performance .. -
Goal

/
/










/



MEASURE
GPRA
/
















PROGRAM



/
/
/
/
/
/
/
^
/
/

/
/
/
NOTE: Accomplishments are pulled from WasteLAN on a quarterly basis
July 1, 1998
D-8


-------
                                                                         OSWER Directive 9200.3-14-E

 FEDERAL FACILITIES DEFINITIONS

 BASE CLOSURE DECISIONS

 Definition:
 A base closure action occurs when EPA is involved in either a CERFA Section 120(h)(4) uncontaminated parcel
 determination, a Finding of Suitability to Transfer (POST), a Finding of Suitability to Lease (FOSL), or a determination
 is made by EPA that an approved remedy is operating properly and successfully at BRAG locations pursuant to
 CERFA/CERCLA Section 120(h)(3). Under CERFA/CERCLA Section 120(h)(4), the military service must designate,
 and EPA/State is required to concur, property that is uncontaminated. A POST documents the conclusion that real
 property made available through the BRAC process is environmentally suitable for transfer by deed under Section 120(h)
 of CERCLA. A FOSL documents that property at a BRAC location is environmentally suitable for lease, i.e., that the
 reuse does not impede the environmental response at the location and that the use of the property is  limited to a manner
 which  will protect human health and the environment.  Under CERCLA Section 120(h)(3), before property can be
 transferred by deed, the military service must demonstrate to EPA that the approved remedy is operating properly and
 successfully.

 Definition of Accomplishment:
 Base Closure Decision Start Date: Date that a document is received by EPA that identifies a facility or a parcel as a
 candidate to be transferred by deed or lease (e.g., BBS submitted); or a clean parcel determination  is received by EPA
 for concurrence as required by CERFA; or the date of the written request submitted by the other Federal agency for
 concurrence on suitability to transfer or lease; or the date on which a written request for EPA concurrence is received
 that a 120(h)(3) remedy is operating properly and successfully.

 Base Closure Decision Completion Date: The date the appropriate Regional official signs a letter, form, or memo stating
 that EPA has completed its review and provided comments or concurrence on the POST or FOSL; or the date the
 appropriate Regional official signs a  letter, form, or  memo stating that EPA  has completed its  review of the
 demonstration that a remedy is operating properly and successfully for purposes of CERCLA section 120(h)(3); or the
 date the appropriate Regional official signs a letter concurring on a clean parcel identified under CERFA.

 Changes in Definition FY 98 - FY 99/00:
 None                                          .

 Special Planning/Reporting Requirements:
 This is a GPRA measure.


 FEDERAL FACILITY AGREEMENT (FFA)/INTERAGENCY AGREEMENT (IAG)
 STARTS

 Definition:
 FFAs/IAGs are legal agreements between Federal agencies responsible for cleanup, EPA, and the States. A State may
 elect not to participate in FFA/IAG negotiations. FFA/IAGs set forth detailed requirements for performance of site
 response activities as well as appropriate enforcement responses to non-compliance with the FFA/IAG. FFA/IAG
 requirement is set forth in Section  120(e) of CERCLA.                                                 •

 Definition of Accomplishment:
FFA/IAG Start Date: Date notice letter is sent by EPA to the Federal facility, reported in WasteLAN as the actual start
date (Actual Start) of FFA/IAG negotiations (Action Name = IAG Negotiation).

 Changes in Definition FY  98 - FY 99/00:
None


                                                D-9                                      July 1, 1998

-------
OSWER Directive 9200.3-14-E

Special Planning/Reporting Requirements:
FFA/IAG starts will be tracked as IAG negotiations (Action Name = IAG Negotiation). This is a GPRA target/annual
performance goal.


FFA/IAG COMPLETION

Definition:
FFAs/IAGs are legal agreements between Federal agencies responsible for cleanup, EPA, and the States.  A State may
elect  not to participate in FFA/IAG negotiations. FFA/IAGs set forth detailed requirements for performance of site
response activities as well as appropriate enforcement responses to  non-compliance with the FFA/IAG.  FFA/IAG
requirement is set forth in Section  120(e) of CERCLA.

Definition of Accomplishment:
FFA/IAG Completion Date: Latter of the dates that the Federal agency, EPA, and/or State sign the IAG, or the date
the Letter of Intent to sign an IAG is signed by all parties.  This date must be reported in WasteLAN as the actual
completion date (Actual Complete) of the FFA/IAG negotiations (Action Name = IAG Negotiation) and the actual
completion date (Actual Complete) of the FFA/IAG (Action Name =  Federal Interagency Agreements).

Changes in Definition FY 98-FY 99/00:
None

Special Planning/Reporting Requirements:
FFA/IAG completions will be tracked as both the completion (Actual Complete) of IAG negotiations (Action Name =
IAG Negotiation) and the completion  (Actual Complete) of the FFA/IAG (Action Name = Federal Interagency
Agreement).  For those FFAs/IAGs that are elevated for dispute resolution, record the date elevated as the actual
completion date of the SubAction  "IAG Dispute Admin Referral" and not as the FFA/IAG completion date.  Regions
do not receive credit for FFA/IAG completion when the FFA/IAG is  elevated to HQ for dispute resolution. This is a
GPRA target/annual performance goal.
 FEDERAL FACILITY DISPUTE RESOLUTION

 Definition:
 When the Federal agency, State, and/or EPA make an effort to formally or informally resolve a FFA/IAG dispute after
 the FFA/IAG is signed.

 Definition of Accomplishment:
 Dispute Resolution Start Date: Date that any party to the FFA/IAG sends a letter to the other parties notifying them as
 to the issue in dispute. This is reported in WasteLAN as the actual start date (Actual Start) of dispute resolution (Action
 Name = Alternative Dispute Resolution).

 Dispute Resolution  Completion Date: Date the document resolving the  issue  is  signed (e.g., letter of agreement,
 agreement document). This is reported in WasteLAN as the actual completion date (Actual complete) of dispute
 resolution (Action Name = Alternative Dispute Resolution).

 Changes in Definition FY 98 - FY  99/00:
 None
 July 1, 1998                        •            D-10

-------
                                                                         OSWER Directive 9200.3- 14-E

Special Planning/Reporting Requirements:
Federal Facility Dispute Resolution is reported in WasteLAN as Alternative Dispute Resolution (Action Name =
Alternative Dispute Resolution) with a Federal facility (FF) lead. This is a program measure.



USE OF SUPPLEMENTAL ENVIRONMENTAL PROJECTS (SEPs)

Definition:
SEPs are environmentally beneficial projects which a Federal agency agrees to undertake to mitigate a monetary penalty,
but which the violator is not otherwise legally required to perform. The SEP could be for public health, pollution
prevention, pollution  reduction, environmental restoration and protection, assessments and audits, environmental
compliance promotion, emergency planning and preparedness, or other program-specific projects.

Definition of Accomplishment:
The date of agreement between EPA and Federal agency to implement a SEP is reported in WasteLAN as the SubAction
"Supplemental Envir Projects". The estimated dollar value of the SEP must also be entered.

Changes in Definition:
This is a new measure.

Special Planning/Reporting Requirements:
This is a program measure.  Both the number of SEPs and their estimated value will be tracked.  The estimated value
of the SEP is reported  on the Penalty/SEP screen in the Federal Facilities module in WasteLAN.
REMEDIAL INVESTIGATION/FEASIBILITY STUDY (RI/FS) OR RCRA FACILITY
INVESTIGATION (RFI) STARTS

Definition:
The RI/FS is a CERCLA investigation designed to characterize the site, assess the nature and extent of contamination,
evaluate potential risks to human health and the environment, and develop and evaluate potential remedial alternatives.
An RFI is a RCRA investigation designed to evaluate thoroughly the nature and extent of the release of hazardous wastes
and hazardous constituents and  to gather necessary data to support the Corrective Measure Study (CMS) and/or
Interim/Stabilization Measure (ISM).

Definition of Accomplishment:
The RI/FS (Action Name = FF RI/FS or FF RI) or RFI (Action Name = RCRA Facility Investigation) start is defined
as follows:

•   Sites where there has been no RI/FS or RFI work started prior to the effective date of the FFA/IAG, the actual start
    date (Actual Start) is the EPA or State receipt of a draft workplan for the RI/FS or RFI; or

•   Sites where RI/FS or RFI work has been started prior to the FFA/IAG effective date and there has been substantial
    EPA or State involvement (EPA or the State has reviewed and commented, approved/concurred, or accepted the
    workplan); the actual start date (Actual Start) is also the date of receipt of a draft RI/FS or RFI workplan (Note: this
    date will be prior to IAG completion date); or

    Sites where RI/FS or RFI work starts prior to the FFA/IAG effective date and there has been limited EPA or State
    involvement, the date of the RI/FS or RFI actual start date (Actual Start) is the latter date that EPA or the State and
    the other agency sign the FFA/IAG.


                                               D-ll                                     July 1,1998

-------
OSWER Directive 9200.3- 14-E

Changes in Definition FY 98 - FY  99/00:
None

Special Planning/Reporting Requirements:
This is a program measure.
FEASIBILITY STUDY (FS), CORRECTIVE MEASURE STUDY (CMS), OR EE/CA
STARTS
                                                                   ;     '     j
Definition:
The CERCLA FS is used to develop and evaluate all potential remediation alternatives to clean a hazardous waste site.
The RCRA CMS is used to develop and evaluate corrective measure alternatives and to recommend the final corrective
measure. The Engineering Evaluation/Cost Analysis (EE/CA) identifies objectives for non-time critical (NTC) response
actions, and includes an analysis of cost, effectiveness, and implementability of the various alternatives that may be used
to satisfy these objectives.

Definition of Accomplishment:
The FS  (Action Name = FF FS), CMS (Action name = Corrective Measure Study), or EE/CA (Action Name =
Engineering Eval/Cost Analysis) start is defined as follows:

•   Sites where there has been no FS or CMS work started prior to the effective date of the FFA/IAG, the actual start
    date (Actual Start) is the EPA or State receipt of a draft workplan for the FS or CMS; or
•   Sites where FS or CMS work  has been started prior to the FFA/IAG effective date and there has been substantial
    EPA or State involvement (EPA or the State has reviewed and commented, approved/concurred, or accepted the
    workplan), the actual start date (Actual Start) is also the date of receipt of a draft FS or CMS workplan (Note: this
    date will be prior to the IAG completion date); or
•   Sites where FS or CMS work starts prior to the FFA/IAG effective date and there has been  limited EPA or State
    involvement, the FS or CMS actual start date (Actual Start) is the latter date that EPA or the State and the other
    agency sign  the FFA/IAG; or
•   EPA concurrence/approval of the EE/CA workplan.

Changes in Definition FY 98 - FY   99/00:
 None

Special Planning/Reporting Requirements:
This is a program measure. FS, CMS,  or EE/CA start dates are reported  site specifically (Action Name = FF FS,
Corrective Measure Study, or Engineering Eval/Cost Analysis) in WasteLAN.
DECISION DOCUMENTS

Definition:
Upon completion of a Federal facility RI/FS, CMS, or EE/CA, the Federal agency selects a remedy that is presented in
a cleanup decision document (e.g., ROD, RCRA Statement of Basis/Response To Comments or Action Memo).  EPA
may either approve or concur on the remedy selection or, in the case of a dispute, EPA may select the remedy. For EPA,
this authority has been delegated to the Regional Administrator or her/his delegatee.
July 1, 1998                                     D-12

-------
                                                                       OSWER Directive 9200.3- 14-E

Definition of Accomplishment:
Date (Actual Complete) the  ROD (Action Name = Record of Decision), the appropriate RCRA Statement of
Basis/Response To Comments (Action Name = RCRA SB/RTC), or Action Memo (Action Name = Approval of Action
Memo) is signed by the Regional Administrator or delegatee, or the date of EPA concurrence/approval on the clean-up
decision document pursuant to an FFA/IAG or other enforceable decision document, or the date of EPA's letter of
concurrence.

Changes in Definition FY 98 - FY 99/00:
None

Special Planning/Reporting Requirements:
The ROD Completion date is the same as the RI/FS completion date. The EE/CA Completion date is the same as the
Action Memo Completion date. The date of the RCRA Corrective Measure decision document is the CMS  Completion
date. This is a program measure.
DURATION OF ROD TO IAG NEGOTIATION COMPLETION

Definition:
The objective of this measure is to focus attention on the statutory requirement for an IAG to be entered into within 180
days after signature of the ROD.

SARA Section 120(e) (2) states that "within 180 days [after signature of the ROD], the head of the department, agency,
or instrumentality concerned shall enter into a IAG with the administrator for the expeditious completion by such
department, agency, or instrumentality of all necessary remedial action at such facility." This measure tracks compliance
against the CERCLA Section 120 statutory requirements.

Definition of Accomplishment:
The duration of ROD to IAG will be calculated based on the actual completion date of the ROD (Action name = Record
of Decision) and the latter of the dates that the Federal agency, EPA, and/or State sign  the IAG, or the date the Letter
of Intent to sign an IAG is signed by all parties, as reported in WasteLAN as the actual completion (Actual Completion)
of FFA/IAG negotiations (Action Name = IAG Negotiation).

Changes in Definition:
This is a new program measure.

Special Planning/Reporting Requirements:
This is a program measure. Data in WasteLAN will be used to calculate the timespan on a semi-annual basis. HQ will
perform the analysis.


REMEDIAL ACTION (RA) OR RCRA CORRECTIVE MEASURE IMPLEMENTATION
(CMI) STARTS

Definition:
A RA or CMI is the implementation of the remedy selected in  the ROD or appropriate RCRA  corrective measure
decision document at NPL sites to ensure protection of human health and the environment.
                                               D-13                                    July 1, 1998

-------
OSWER Directive 9200.3-14-E
                                               i                 '           i

Definition of Accomplishment:
Date on which substantial, continuous, physical, on-site, remedial actions begin pursuant to SARA Section 120(e) as
documented by a memo or letter to EPA. This date is reported in WasteLAN as the actual RA (Action Name = FF RA)
or CMI (Action Name = Corrective Measure Implementation) start date (Actual Start).

Changes in Definition FY  98-FY  99/00:
 None

Special Planning/Reporting Requirements:
This is a program measure.  RA or CMI starts are reported site specifically (Action Name = FF RA or Corrective
Measure Implementation) in WasteLAN.
TIMESPAN FROM ROD SIGNATURE TO RA START

Definition:
The objective of this measure is to focus attention on the statutory requirement for an RA start within 15 months of the
ROD signature.

SARA Section 120(e) states that "substantial, physical, on-site remedial action shall be commenced at each Federal
facility no later than 15 months after completion of the investigation and study." This measure tracks compliance against
the CERCLA Section 120 statutory requirements.

Definition of Accomplishment:
This measure will look at Federal agency performance by comparing the average timespan from ROD signature to RA
start for all sites where  an RA actually started in FY 99 or 2000.  Sites exceeding the 15 month requirement will be
identified.  Comparisons will be made to previous Agency performance to determine trends.
                                                                   •        i
The durations will be calculated using the actual ROD  (Action Name = Record of Decision) completion dates (Actual
Complete) and the actual RA (Action Name = FF RA) start dates (Actual Start) in WasteLAN. The ROD signature and
RA start definition contained in Decision Documents and RA or Corrective Measure Construction Starts, respectively,
will be used in the analysis.

Changes in Definition FY 98 - FY  99/00:
None

Special Planning/Reporting Requirements:
This is a program measure. Data in WasteLAN will be used to calculate the timespan on a semi- annual basis. HQ will
perform the analysis.
RA OR CMI COMPLETIONS

THIS DEFINITION IS UNDER REVIEW.

Definition:
A RA or CMI is complete when construction activities are complete, a final inspection has been conducted, and a RA
Report or appropriate CMI reporting vehicle has been prepared and approved by EPA. This report summarizes site
conditions and construction activities. Note: this date may be later than 120(h)(3) BRAC requirements for base closure.

July 1,1998                                     D-14

-------
                                                                        OSWER Directive 9200.3- 14-E

Definition of Accomplishment:
The RA or CMI is complete the date that the designated Regional official signs a letter accepting the RA Report or
appropriate CMI reporting vehicle for the RA or CMI or the date the Federal facility's construction manager submits
a signed RA Report or appropriate CMI reporting vehicle that documents the completion of construction activities, and
that the remedy is  Operational and Functional (O&F). In lieu of a report from the contractor's construction manager,
the Region must prepare a report to document the completion. The appropriate date must be recorded in WasteLAN as
the actual completion date (Actual Complete) of the RA (Action Name = FF RA) or CMI (Action Name = Corrective
Measure Implementation).

Changes in Definition FY 98 - FY 99/00:
None

Special Planning/Reporting Requirements:
This is a program  measure.  RA or CMI (Action Name = FF RA or Corrective Measure Implementation) completions
are reported site specifically in WasteLAN.
REMOVAL OR RCRA INTERIM/STABILIZATION MEASURE (ISM) — STARTS AND
COMPLETIONS

Definition:
Removal actions are defined as the cleanup or removal of released hazardous substances from the environment, and the
necessary actions taken in the event of the threat of release of hazardous substances into the environment.  ISMs are
defined as RCRA removal actions that are intended to abate threats to human health and the environment from releases
and/or to prevent or minimize the further spread of contamination while long-term remedies are pursued. Regions need
to report removal actions conducted in response to emergency, time-critical, and non-time critical (NTC) situations at
BRAC Fast Track non-NPL or NPL sites. Under the Defense Environmental Restoration Program (DERP), DoD is
required to notify EPA of its removal actions. Long-term O&M  should not be conducted under the removal.

Definition of Accomplishment:
Removal ISM Start Date:  Date the Federal agency begins actual on-site removal work,  or the  date of Action
Memorandum signature, or the date the lead Federal agency provides notice to EPA, or other decision document
signature/approval. The date must be reported in WasteLAN as the actual start date (Actual Start) of the removal (Action
Name = FF Removal) or ISM (Action Name = RCRA Interim/Stabilization Measure).

Removal/ISM Completion Date: Actual date the Federal agency has demobilized and notified EPA, completing the
scope of work delineated in the Action Memorandum or other decision document. The date must be reported in
WasteLAN as the actual completion date (Actual Complete) of  the removal  (Action Name = FF Removal), or ISM
(Action Name = RCRA Interim/Stabilization Measure).

Changes in Definition FY 98 - FY 99/00:
Removed Early Action (Remedial Authority) from the definition.

Special Planning/Reporting Requirements:
See Definition of Accomplishment. This is a program measure.
                                               D-15                                     July 1, 1998

-------
OSWER Directive 9200.3-14-E

 NPL SITE CONSTRUCTION COMPLETIONS

Definition of Target/Measure:
Construction at a NPL site is considered complete when physical construction is complete for the entire site as a result
of one or several removal or remedial actions; and a Preliminary or Final Superfund Site Close Out Report has been
signed by the Region and recorded at HQ. Sites that receive credit under this measure will have no further response
actions, other than the ongoing "long-term response action" (LTRA) component of the cleanup actions being
performed. Regions receive credit for construction completion only once per site.

Accomplishments under this measure will count toward the goal of 900 site construction completions by the end of the
year 2000.

Definition of Accomplishment:
The following tables have been provided to more clearly depict coding and accomplishment requirements.
July 1, 1998
D-16

-------
                                                                         OSWER Directive 9200.3-14-E
                   ,          „  SNPL Site Construction Completion/           ^
                  Through EariyActJonstRemedial Authority) or Long-Term Actions
Definition of Accomplishment
    Construction activities at all
    OUs are complete; or

    Institutional controls specified
    in the final Limited Remedial
    Action ROD are in place

             AND

    A Preliminary Site Close-Out
    Report (PCOR)* has been
    signed by the designated
    Regional official; or

    A Final Site Close-Out Report
    has been prepared and signed
    by the designated Regional
    official

             AND

    HQ has received appropriate
    documentation of construction
    completion**
Actual Completion Date
Date  the  designated  Regional
official signs the Preliminary  or
Final  Superfund Site  Close-Out
Report

             AND
Coding Requirements
Region:
The completion date of the report
must be entered into WasteLAN as the
actual completion date (Actual
Complete) of the Preliminary
Superfund Site Close-Out Report
[Action Name = Remedial Action or
PRP RA and SubAction Name =
Prelim Close-Out Rep Prepared], or
the actual completion date (Actual
Complete) of the Final Superfund Site
Close-Out Report [Action Name =
Remedial Action or PRP RA and
SubAction Name = Close Out Report]

               AND

HQ:
HQ enters the Construction
Completion indicator and
Construction Completion date into
WasteLAN.**
NOTE: The Region must prepare a Preliminary or Final Superfund Site Close-Out Report.

*   A PCOR is not required if the Region immediately prepares a Final Superfund Site Close-Out Report. Refer
    to "Close-Out Procedures for NPL sites" for additional information.

**  Documents for construction completions, received by Headquarters after the fiscal year close-out date, will be
    dated effective the first work day of the new fiscal year.
                                                D-17
                                                         July 1, 1998

-------
 OSWER Directive 9200.3-14-E
                             NPL Site Construction Completion as a result of
                               No Action/Groundwater Monitoring RODs
  Definition of Accomplishment
  ROD is signed for the final
  Operable Unit (OU) with no
  previous RAs stating that no
  physical construction is required or
  the only activity performed is
  groundwater monitoring and a
  Preliminary* or Final Superfund
  Site Close-Out Report is signed by
  the designated Regional official.

               AND

  HQ has received appropriate
  documentation of construction
  completion.**
Actual Completion Date
Date the designated Regional
official signs the Preliminary
or Final Superfund Site Close-
Out Report.
Coding Requirements
Region:
Regions enter the following into
WasteLAN: The completion date of the
close-out report is the actual completion
date (Actual Complete) of the PCOR
(Action Name = Record of Decision and
SubAction Name = Prelim Close-Out
Report Prepared) or the actual
completion date (Actual Complete) of
the Final Superfund Site Close-Out
Report (Action Name = Record of
Decision and SubAction Name = Close
Out Report).

               AND

HQ:
HQ enters the Construction Completion
indicator and Construction Completion
date into WasteLAN.**
  NOTE: The Region must prepare a Preliminary or Final Superfund Site Close-Out Report.

  *   A PCOR is not required if the Region immediately prepares a Final Superfund Site Close-Out Report. Refer
      to "Close-Out Procedures for NPL Sites" for additional information.

  **  Documents for construction completions, received by Headquarters after the fiscal year close-out date, will
      be effective the first work day of the new fiscal year.	
July 1, 1998
             D-18

-------
                                                                         OSWER Directive 9200.3-14-E
                           'NPL Site Construction Cdjmpletioiu asxa result of;-s£$S Jj ".:  '*".• *|  ^^j-
                          No Further Actjon/Groundwater Monitoring RODS,-"- ,:.^ ^. ..u g.  '%f$
Definition of Accomplishment
ROD is signed for the final OU
stating that all physical construction
is complete or the only activity
performed is groundwater
monitoring and a Preliminary* or
Final Superfund Site Close-Out
Report must be signed by the
designated Regional official.

             AND

HQ has received appropriate
documentation of construction
completion**
Actual Completion Date
Date the designated Regional
official signs the Preliminary or
Final Superfund Site Close-Out
Report.
Coding Requirements
Region:
The completion date of the close-out
report is the actual completion date
(Actual  Complete)  of the PCOR
(Action Name — Record of Decision
and  SubAction  Name  =  Prelim
Close-Out Report Prepared)
or the actual completion date (Actual
Complete)  of  the Final  Superfund
Site Close-Out Report (Action Name
= Record of Decision and SubAction
Name = Close Out Report).

              AND

HQ:
HQ enters the Construction
Completion indicator and
Construction Completion date into
WasteLAN.**
NOTE: The Region must prepare a Preliminary or Final Superfund Site Close-Out Report.

*   A PCOR is not required if the Region immediately prepares a Final Superfund Site Close-Out Report. Refer
    to "Close-Out Procedures for NPL Sites" for additional information.

**  Documents for construction completions, received by Headquarters after the fiscal year close-out date, will
    be effective the first work day of the new fiscal year.
                                                D-19
                                                         July 1, 1998

-------
OSWER Directive 9200.3-14-E
                               NPL Site Construction Completion through
                            Limited Remedial Actions - Institutional Controls
  Definition of Accomplishment
  Grounwater cleanup goals are met
  through natural attenuation and a
  Preliminary* or Final Superfund
  Site Close-Out Report is signed by
  the designated Regional official.

               AND

  HQ has received appropriate
  documentation of construction
  completion**
Actual Completion Date
Region:
Date the designated Regional
official signs the Preliminary or
Final Superfund Site Close-Out
Report.
Coding Requirements
Region:
The completion date of the close-out
report is the actual completion date
(Actual Complete) of the PCOR
(Action Name = Remedial Action and
SubAction Name = Prelim Close-Out
Report Prepared) or the actual
completion date (Actual Complete) of
the Final Superfund Site Close-Out
Report (Action Name = Remedial
Action and SubAction Name = Close-
Out Report).

               AND

HQ:
HQ enters the Construction Completion
indicator and Construction Completion
date into WasteLAN.**
  NOTE: The Region must prepare a Preliminary or Final Superfund Site Close-Out Report.

  *   A PCOR is not required if the Region immediately prepares a Final Superfund Site Close-Out Report. Refer to
     "Close-Out Procedures for NPL Sites" for additional information.

  ** Documents for construction completions, received by Headquarters after the fiscal year close-out date, will be
     effective the first work day of the new fiscal year.
July 1, 1998
             D-20

-------
                                                                        OSWER Directive 9200.3-14-E
                             NPL Site Construction Completion through v
                                 Early Action (Removal Authority)  -
Definition of Accomplishment
Fund-Financed:
Contractor demobilized
(recorded in POLREP)

PRP-Financed:
Region certifies that PRPs or
their contractor have completed
the removal specified in the
Action Memorandum and fully
met the terms of the AO, CD or
judgment

Both Fund- and PRP-
Financed:
A Preliminary* or Final
Superfund Site Close-Out
Report has been signed by the
designated Regional official

            AND

HQ has received appropriate
documentation of construction
completion**
Actual Completion Date
Region:
Date the designated Regional
official signs the Preliminary
or Final Superfund Site
Close-Out Report
Coding Requirements
Region:
The   Region  enters   the  following   into
WasteLAN:

The removal (Action Name = Removal
Action or PRP Removal) actual completion
date (Actual Complete) as reported in the
POLREP; and the early action Qualifier that
indicates that the site is Cleaned Up; and the
actual completion date (Actual Complete) of
the PCOR (Action Name = Removal or PRP
Removal SubAction Name = Prelim Close-
Out Report Prepared) or the actual
completion date (Actual Complete) of the
Final Superfund Site Close-Out Report
(Action Name = Removal Action or PRP
Removal and SubAction Name = Close Out
Report);

                  AND

HQ:
HQ enters the Construction Completion
indicator into WasteLAN.**
NOTE: The Region must prepare a Preliminary or Final Superfund Site Close-Out Report.

*   A PCOR is not required if the Region immediately prepares a Final Superfund Site Close-Out Report. Refer to
    "Close-Out Procedures for NPL Sites" for additional information.

**  Documents for construction completions, received by Headquarters after the fiscal year close-out date, will be
    effective the first work day of the new fiscal year.
                                               D-21
                                                           July 1, 1998

-------
 OSWER Directive 9200.3- 14-E

 Changes in Definition FY  98 - FY 99/00:
 Added NOTE emphasizing that the Region must prepare a Preliminary or Final Superfund Site Close Out Report to
 receive credit for a construction completion.

 Special Planning/Reporting Requirements:
 Regions will not receive credit for a NPL Site Construction Completion until the actual completion date of
 the Preliminary or Final Superfund Site Close-Out Report is entered into WasteLAN and the necessary
 documentation is submitted to HQ, and HQ enters the Construction Completion indicator into WasteLAN.
 Accomplishments under this measure will count toward the goal of 900 NPL Construction Completions by the end of
 the year 2001. Regions identify sites to meet the goal prior to the start of the FY. There is only one NPL
 construction completion at a site. Regions may receive credit under this measure and the NPL Site Completion
 Measure as a result of the same remedial or, removal action.  This is a GPRA target/annual performance goal.


 FEDERAL FACILITY FIVE- YEAR REVIEWS

 Definition:
 Five-year reviews are intended to evaluate whether the response action implemented at NPL site remains protective
 of public health and the environment, is functioning as designed, and necessary operation and mainenance is being
 performed. Every five years, EPA will review any site at which a remedy, upon attainment of the ROD or Action
 Memorandum cleanup levels, will not allow unlimited use and unrestricted exposure. Five-year reviews generally
 involve a site visit or documentation of conditions noted through ongoing presence at the site.

 EPA is responsible for conducting five-year reviews  at all sites where required.  Consistent with relevant settlement
 agreements, a lead agency may authorize PRPs to visit sites for five-year review purposes and to conduct studies and
 investigations for EPA. Five-year reviews are conducted on an OU basis until the site reaches construction
 completion. After that time, five-year reviews are conducted on a site-wide basis.

 Definition of Accomplishment:
 Five-Year Review Starts - Credit  is given for a five-year review start when EPA approves the five-year review
 workplan submitted by the other Federal agency, or when the Federal facility actually starts the review or submits the
 draft document for review, as outlined in the ROD or IAG. The actual start date (Actual Start) for the five-year
 review (Action Name = Five-Year Remedy Assessment) must be entered into WasteLAN.

 Five-Year Review Completions -  The five-year review is complete on the date the designated Regional official signs
 the five year review report stating whether the remedy is, or is not, protective of human health and the environment.
 The actual completion date (Actual Complete) for the five-year review (Action Name = Five-Year Remedy
 Assessment) must be entered  into  WasteLAN.

 Changes in Definition FY  98-FY 99/00:
 None

 Special Planning/Reporting Requirements:
 Five-Year Review Starts and Completes is a program measure.  Five-year review starts and completes must be
 planned and reported site-specifically (Action Name  = Five-Year Remedy Assessment) in WasteLAN.


 FEDERAL FACILITY PARTIAL NPL DELETION

 Definition:
 EPA will consider partial deletion for portions of sites when no further response is appropriate for that portion of the
 site. Such portion may be a defined geographic unit of the site, perhaps as small as a residential unit, or may be a
 specific


July 1, 1998                                     D-22

-------
                                                                            OSWER Directive 9200.3-14-E


medium at the site (e.g., groundwater), depending on the nature or extent of the release(s). The criteria for partial
deletion are the same as for final deletion. .Given State concurrence, EPA considers:

•  " Whether responsible or other parties have implemented all appropriate and required response actions;

•   Whether all appropriate Fund-financed responses under CERCLA have been implemented and EPA has
    determined that no further cleanup by responsible parties is appropriate; or

•   Whether the release of hazardous substances poses no significant threat to the public health, welfare or the
    environment, thereby eliminating the need for remedial action.

The partial deletion action should only be used when the deletion does not address all releases listed on the NPL. If
a deletion does cover the remaining release listed on the NPL, the action should be treated as a Final NPL Deletion
(Action Name = Final Deletion from NPL), discussed below.

Definition of Accomplishment:
The partial NPL deletion process (Action Name = Partial Deletion from NPL) starts (Actual Start) when a Notice of
Intent to Delete is published in the Federal Register for that specified portion of the site.

The partial NPL deletion process (Action Name = Partjal Deletion from NPL) is complete (Actual Complete) when
the Notice of Partial Deletion is published in the Federal Register for that specified portion of the site.

HQ will enter the Partial Deletion from the NPL Action and the actual start and completion dates into WasteLAN.

Changes in Definition FY  98 - FY 99/00:
 HQ is responsible for entering partial deletion starts and completions into  WasteLAN.

Special Planning/Reporting Requirements:
Partial NPL deletions are tracked separately from final NPL deletions (Action Name = Final Deletion from NPL).
Partial site deletions will be entered by HQ if a portion, or portions, of the release remain listed on the NPL
following completion of the partial deletion. When  the Notice of Partial Deletion is published, HQ will change the
NPL Status to "Partially Deleted from the NPL".

A site deletion (Action Name = Final Deletion from NPL) will be entered by HQ if the deletion activity addresses all
remaining'releases listed on the NPL (either as a one-time deletion action for the entire site as originally listed, or as
the last deletion activity associated with a site subject to previous partial deletions).  This is a program measure.


FEDERAL FACILITY FINAL NPL DELETION

Definition:
With State concurrence, EPA may delete sites from the NPL when it determines that no further response is appropriate
under CERCLA.  In making that determination, EPA considers:

•   Whether responsible or other parties have implemented all appropriate and required response actions;

•   Whether all appropriate Fund-financed responses under CERCLA have been implemented and EPA has determined
    that no further cleanup by responsible parties is appropriate; or

•   Whether the release  of hazardous substances  poses no significant threat to the public health, welfare or the
    environment, thereby eliminating the need for remedial action.

EPA will consider deleting the entire site or portions of sites from NPL, as appropriate.  EPA will consider partial

                                                 D-23                                      July  1,  1998

-------
OSWER Directive 9200.3-14-E

deletion for portions of sites when no further response is appropriate for that portion of the site. Such portions may be
a defined geological unit of the site, or may be a specific medium at the site. If a decision does cover the remaining
release listed on the NPL, the action should be treated as a Final NPL Deletion.  State concurrence is required for any
deletion.

Definition of Accomplishment:
The deletion process for the entire site [Action Name = Final Deletion from the NPL] starts (Actual Start) when a Notice
of Intent to Delete is published for the Federal Register.,

The deletion process for the entire site [Action Name = Final Deletion from the NPL] is complete (Actual Complete)
when the Notice of Deletion is published in the Federal Register.

HQ will enter the Final Deletion from NPL Action and actual start and completion dates into WasteLAN.

Changes in Definition FY  98 - FY 99/00:
 HQ is responsible for entering partial deletion starts and completions into WasteLAN.

Special Planning/Reporting Requirements:
An entire site deletion action (Action Name = Final Deletion from the NPL) will be entered by HQ if the deletion activity
addresses the remaining release listed on the NPL (either as a one-time deletion event for. the entire site as originally
listed, or as the last deletion activity associated with a site subject to previous partial deletions). When the Notice of
Deletion is published, HQ will change the NPL Status in WasteLAN to "Deleted from Final NPL."  This is a program
measure.
July 1, 1998
P-24

-------
                                                                  OSWER Directive 9200.3-14-E
                                    EXHIBIT D.2(l OF 4)
                      FEDERAL FACILITIES PLANNING REQUIREMENTS
Planning Requirements
GPRA Target/Annual
Performance Goal
GPRA or Program
Measure?
Planned/Reported
Semi-Annually, Annually,
or Both?
Planned Site-Specifically?
Planned/Reported on
Operable Unit or Whole
Site Basis?
Reported Site-Specifically
or in Non-Site Specific
Portion of WasteLAN?
' Base Closure
Decisions
-
GPRA Measure
Both
No
Operable Unit
or Parcel
Site-Specific
FFA/IAG Starts
•& *
GPRA Target
-
Both
Yes
Whole Site
Site-Specific
, FFA/IAG
Completions
GPRA Target
-
Both
Yes
Whole Site
Site-Specific
Federal Facility ;
- Dispute Resolution
-
Program Measure
Both
No
Operable Unit
Site-Specific
NOTE: Accomplishments are pulled from WasteLAN on a semi-annual basis.

                                    EXHIBIT D.2 (2 OF 4)
                     FEDERAL FACILITIES PLANNING REQUIREMENTS
Planning Requirements
GPRA Target/Annual
Performance Goal
GPRA or Program
Measure?
Planned/Reported
Semi-Annually, Annually,
or Both?
Planned Site-Specifically?
Planned/Reported on
Operable Unit or Whole
Site Basis?
Reported Site-Specifically
or in Non-Site Specific
Portion of WasteLAN?
- Use of
Supplemental
Environmental
Projects
(SEPs) ":
-
Program
Measure
Both
No
Whole Site or
Operable Unit
Site-Specific
RI/FS or RFI
- Starts >
-
Program
Measure
Both
Yes
Operable Unit
Site-Specific
FS, CMS, or
EE/CA Starts
-
Program
Measure
Both
Yes,
Operable Unit
Site-Specific
Decision
' Documents
-
Program
M.easure
Both
Yes
Operable
Unit
Site-Specific
Duration of
ROD to IAG
Completion
-
Program
Measure
Both
N/A
Operable
Unit
Site-Specific
NOTE: Accomplishments are pulled from WasteLAN on a semi-annual basis.
                                           D-25
July 1, 1998

-------
OSWER Directive 9200.3- 14-E
                                   EXHIBIT D.2 (3 OF 4)
                     FEDERAL FACILITIES PLANNING REQUIREMENTS
Planning Requirements
GPRA Target/Annual
Performance Goal
GPRA or Program
Measure?
Planned/Reported
Semi-Annually, Annually,
or Both?
Planned Site-Specifically?
Planned/Reported on
Operable Unit or Whole
Site Basis?
Reported Site-Specifically
or in Non-Site Specific
Portion of WasteLAN?
RA Starts or
CMI
-
Program Measure
Both
Yes
Operable Unit
Site-Specific
Timespan From -
ROD Signature
to RA Start
-
Program Measure
Annual
N/A
Operable Unit
Site-Specific
RA or CMI
Completions
-
Program Measure
Both
Yes
Operable Unit
Site-Specific
Removal
ISM Starts and
Completions
-
Program Measure
Both
No
Based on Individual
Incident
Site-Specific
NOTE: Accomplishments are pulled from WasteLAN on a semi-annual basis.

                                   EXHIBIT D-2 (4 OF 4)
                     FEDERAL FACILITIES PLANNING REQUIREMENTS
Planning Requirements
GPRA Target/Annual
Performance Goal
GPRA or Program
Measure?
Planned/Reported
Semi-Annually, Annually,
or Both?
Planned Site-Specifically?
Planned/Reported on
Operable Unit or Whole
Site Basis?
Reported Site-Specifically
or in Non-Site Specific
Portion of WasteLAN?
NPL Site
Construction
Completions
GPRA Target
-
Both
Yes
Whole Site
Site-Specific
Federal Facility
Five- Year
Reviews
-
Program Measure
Both
Yes
Whole Site
Site-Specific
Federal Facility
Partial NPL
Deletion
-
Program Measure
Both
Yes
Portion of Site as
Identified
Site-Specific
Federal Facility
' Final NPL
Deletion
'
Program Measure
Both
Yes
Whole Site
Site-Specific
NOTE: Accomplishments are pulled from WasteLAN on a semi-annual basis.
July], 1998
D-26

-------
                                                                         OSWER Directive 9200.3-14-E

 COMMUNITY INVOLVEMENT DEFINITIONS

 The following Community Involvement requirements for Federal facilities have been included as a reference.
 Community Involvement requirements for non-Federal facility sites are included in Appendix J.


 COMMUNITY INVOLVEMENT PLAN

 Definition:
 The National Contingency Plan (NCP) requires a Community Involvement Plan for all remedial response actions
 and for all removals longer than 120 days. Community Involvement Plans document concerns identified during
 community interviews and provide a detailed description of the community involvement activities planned on the
 basis of these interviews. For remedial actions, the plan must be prepared before the Remedial
 Investigation/Feasibility Study (RI/FS) begins. A revised plan that identifies additional activities during Remedial
 Design and remedial construction should be prepared before RD begins.

 Definition of Accomplishment:
 Community Involvement Plan:
 Date the Community Involvement Plan is published/issued (e.g., date stamped on document) by the appropriate
 Regional official is reported in WasteLAN as the actual completion date (Actual Complete) of the SubAction
 "Community Involvement Plan."

 Amended Community Involvement Plan:
 The date  the Amended Community Involvement Plan is published/issued (e.g., date stamped on document) by the
 appropriate Regional official is reported in WasteLAN as the actual completion date (Actual Complete) of the
 SubAction "Rev Community Involvement Plan."

 Changes in Definition FY 98 - FY 99/00:
 This is a new program measure.

 Special Planning/Reporting Requirements:
 These SubActions  are valid for the following Actions in WasteLAN: PRP Community Relations, Federal Facility
 Community Relations, Remedial Community Relations, and Removal Community Relations.  Funds for Community
 Involvement Plans are in the Federal facility, site characterization, removal, or enforcement AOAs. This is a
 program measure.


INFORMATION REPOSITORY

Definition:
The information repository is a project file or repository containing site information, documents on site activities,
and general information about the Superfund program. EPA requires an information repository at all sites where
remedial activities  are being performed and any sites  where a removal action is being conducted that is likely to
extend  beyond 120 days.

Definition of Accomplishment:
The date the Information Repository is established is-reported in WasteLAN as the actual completion date (Actual
Complete) of the Subaction "Info Repository Established."

Changes in Definition FY 98 - FY 99/00:
This is  a new program measure.
                                               D-27                             '        July 1,1998

-------
OSWER Directive 9200.3-14-E

Special Planning/Reporting Requirements:
These SubActions are valid for the following Actions in WasteLAN: PRP Community Relations, Federal Facility
Community Relations, Remedial Community Relations, and Removal Community Relations. This is a program measure.
PUBLIC MEETING

Definition:
Public meeting is a forum to inform citizens of ongoing response activities, and to discuss and receive citizen feedback
on the proposed course of action.  The Agency must offer to hold a public meeting before adopting a plan for remedial
action or ROD.

Definition of Accomplishment:
The date the public meeting is held is reported in WasteLAN as the actual completion date (Actual Complete) of the
SubAction "Public Meeting."

Changes in Definition FY 98 - FY 99/00:
This is a new program measure.

Special Planning/Reporting Requirements:
This is a program measure. These SubActions are valid for the following Actions in WasteLAN: PRP Community
Relations, Federal Facility Community Relations, Remedial Community Relations, and Removal Community Relations.
RESTORATION ADVISORY BOARDS(RABs)/SITE-SPECIFIC ADVISORY
BOARDS(SSABs)

Definition:
Site-Specific Advisory Boards (SSABs) are a forum for experts and concerned stakeholders to provide advice and
recommendations on DOE's Environmental Management strategic decisions. Restoration Advisory Boards (RABs)
provide a forum through which members of nearby communities can provide input to DoD's environmental restoration
program.

RABs and SSABs complement other community involvement activities, such as public meetings, mailings, and local
information repositories.

Definition of Accomplishment:
RAB/SSAB Established Date: The establishment of the RAB/SSAB is defined as the actual complete date (Actual
Complete) of the initial RAB/SSAB information meeting. (SubAction Name = Site-Specific Advisory Board Meeting
or SubAction Name = Restoration Advisory Board Meeting).

RAB Adjourned Date: Date the RAB is adjourned by DoD.

SSAB Terminated Date: Date the SSAB is terminated by the Secretary of Energy.
                                                               !          I
 Changes in Definition FY 98 - FY  99/00:
This is a new program measure.
 July 1, 1998                                    D-28

-------
                                                                        OSWER Directive 9200.3-14-E

 Special Planning/Reporting Requirements:
 This is a GPRA measure. The data management approach for tracking the adjournment of RABs and the termination
 of SSABs is still under development.  Site Specific Advisory Board Meeting and Restoration Advisory Board Meeting
 are valid SubActions under Federal Facility Community Relations.


 TECHNICAL ASSISTANCE GRANTS (TAGs)

 Definition:
 The Superfund Amendments and Reauthorization Act of 1986 (SARA) established the TAG program to provide technical
 assistance to eligible communities.  The technical assistance allows communities to improve the decision making process
 at their sites.

 Definition of Accomplishment:
 The start of the TAG (Action Name = Community Relations TA Grants) is the signature of the award agreement to the
 community group which is the obligation of funds for the TAG. The completion of the TAG is the date the grant is
 closed out by the Region.

 Changes in Definition FY 98 - FY 99/00:
 The completion of the TAG is the date it is closed out by the Region.

 Special Planning/Reporting Requirements:
 TAG Starts is a GPRA measure. The Region must also enter the following information into WasteLAN:
 •   Total Dollar Amount of Grant;
 •   Initial Dollar Amount of Grant; and
 •   Waiver Amount if applicable; or
 •   Deviation Amount, if applicable.

 Planned start and completion dates are not required in WasteLAN. Funds may be planned site-or non-site specifically;
 however, they must be obligated site specifically. Funds for TAGs at non-Federal facility sites are contained in the
 response budget and found in the other response AOA.  Funds for TAGs at Federal facility sites are contained in the
 Federal facility budget and found in the Federal facility AOA.


 TECHNICAL  OUTREACH SUPPORT FOR COMMUNITIES (TOSC)

 Definition:
 TOSC provides independent scientific and technical assistance to communities  dealing with hazardous substance
 contamination questions. TOSC provides information and education to empower communities with an understanding
 of technical issues  to more effectively participate in environmental decisions. TOSC is a service of the University-based
 Hazardous Substance Research Centers (HSRCs) which are, in part, supported by grants from EPA.

 Definition of Accomplishment:
 The date of the commitment between the community and the  HSRCs is reported in WasteLAN as the actual start date
 (Actual Start) of the TOSC (Action Name = Technical Outreach Services to Communities).

 Changes in Definition FY 98 - FY 99/00:
 This is a new program measure.

Special Planning/Reporting Requirements:
The Region must indicate on the Community Organizations Information screen that the organization is a TOSC recipient.
This is a program measure.
                                               D-29                                    My 1, 1998

-------
OSWER Directive 9200.3-14-E
                                       This Page Intentionally
                                             Left Blank
July 1, 1998
D-30

-------
                                          OSWER Directive 9200.3-14-IE
Superfund/Oil Program Implementation Manual FY 99/00




      Appendix E: Superfund Information Systems
                                                      July 1, 1998

-------
OSWER Directive 9200.3-14-lE
                                        This Page Intentionally
                                              Left Blank
 July 1,1998

-------
                                                                     OSWER Directive 9200.3-I4-IE

                                          Appendix E
                               Superfund Information Systems

                                       Table of Contents

SUPERFUND INFORMATION SYSTEMS	E-1
    The Purpose of WasteLAN	,	E-1
       Site Assessment	E-1
       Risk Assessment	E-2
       Remedy Selection	E-2
       Federal Facilities	 E-2
       Community Involvement	E-3
       Removal	E-3
       Enforcement	'.	E-3
       Project Management	E-4
       Program Management	E-4

    Superfund Data Architecture	E-4

    Reporting Superfund Information	 E-6
       WasteLAN Users	E-7

    Applicability of the Freedom of Information Act	E-7
       Reports  Releasable under Freedom of Information Act (FOIA) 	E-7
       Sensitive Information Not Releasable under FOIA	E-7
       Ad Hoc  Reporting	E-10
       Accessing FOIA Information	E-11

    Data Owners/Sponsorship	E-12
                                                                                      July 1, 1998

-------
OSWER Directive 9200.3-14-1E



                                       Appendix E
                             Superfund Information Systems

                                     List of Exhibits

EXHIBIT E.I Superfund Data Architecture	E-5
July 1, 1998

-------
                                                                           OSWER Directive 9200.3-14- IE
                                            APPENDIX E
                           SUPERFUND INFORMATION SYSTEMS
 THE PURPOSE OF WasteLAN

    WasteLAN is the official repository of nationally defined and nationally required data for planning, tracking, and
 describing all activities at sites and removal incidents.

 The following types of site/incident activity have national definitions and national requirements:

 •   Site Assessment

 •   Risk Assessment

 •   Remedy Selection

 •   Federal Facilities

 •   Community Involvement

 •   Removal

 •   Enforcement

 •   Project Management

 •   Program Management

 Site Assessment

 To support the site assessment process, WasteLAN supports the following activities:

    Enter, store, and retrieve basic site discovery information, including site identification (name and location), narrative
    description, contaminants, and site setting;
 •   Distinguish between removal program or site assessment program discoveries;
 •   Import site  scoring data for the PA, SI, ESI, and SIP from PA-Score and PREscore through an Electronic Data
    Submission (EDS) utility;
•   Review and compare results of the PA, SI, ESI, and SIP, including overall HRS site score and component pathway;
    scores;
•   Access to detailed information on each pathway score;
•   Enter, store, and retrieve site assessment decision information, including qualifiers and text rationale and referrals
    to States or  other program areas;
•   Manage site assessment schedules through the Project Management module; and
•   Generate site assessment reports and perform ad hoc queries on basic site level and decision information, as well
    as site and pathway score information.
                                                  E-l                                        July 1, 1998

-------
OSWER Directive 9200.3-14-1E

Risk Assessment

To support the risk assessment process, WasteLAN supports the following activities:

•   Track, plan, redefine, and review project milestones on an operable unit basis;
•   Record and review risk  assessment overview information for each action by media, including the worst risk
    scenarios;
•   Record, revise, reuse, and review information from the PA, SI, ESI, removal evaluation, or HRS;
•   Record, review and edit  contaminants of concern versus relevant standards and a summary of the contaminant-
    specific risks for each medium;
•   Review and evaluate the use of exposure assumptions in the human health and ecological risk assessment;
•   Record, review and update scenarios by time frame for each medium area; scenarios contain pertinent factors (i.e.
    land use, exposure time frame, location, receptor, exposure route) and reflect at least one scenario for each land use
    assessed;
•   Compile, review, revise, and view a summary of pertinent ecological risk assessment information including potential
    receptors, sensitive habitats, and endangered/threatened species; and
•   Record, review, and compare risk assessment information contained in remedial and removal decision documents.

Remedy Selection

To support the remedy selection process, WasteLAN supports the following activities:

•   Add and delete Actions to the site schedule and add new operable units;
•   Add, edit, and review  an Action and its associated operable unit, actual and planned start dates, and actual and
    planned completion dates;
• ' View and update site  information, including media, contaminants, concentrations, and regulations that possibly apply
    to the contaminant;
•   View and  update a site synopsis which can be used to aid  in the development of remedial documents, such as
    proposed plans and Records of Decision (ROD);
•   View cost and performance information on treatability studies, if available;
•   Upload contractor developed electronic information contained in the RI/FS to support the development of the ROD
    or use the ROD information in the development of the Remedial Design (RD) report;
•   View and compare analyses  among pipeline actions  for  site contaminants, contaminated medium, and site
    risk/threats;
•   Identify program initiative sites, such as contaminated sediments or presumptive remedy sites;
•   Perform queries to identify "like sites";
•   View selected remedies at sites with signed RODs including remedial response actions associated with the selected
    remedy; and
•   Create ROD abstracts.

Federal Facilities

To support Federal facilities, WasteLAN supports the following activities:

 •    View, edit, and track information pertaining to dispute resolutions such as the issue triggering dispute, compliance
     status, and dispute phase (i.e., informal or formal);
 •    Record, display,  and view information pertaining to IAG/FFA negotiations and agreements;
 •    Record, display,  and update information pertaining to BRAC-NPL, non-NPL sites, and program initiative sites;
 •    See listings of all IAG milestones to be reviewed within a user-specified time frame;
 •    Record and display a site abstract feature;
 •    Record and display information pertaining to sites requiring information on the FFTS and Docket;
 •    Provide the capability  to display and search on penalty and formal dispute resolution information; and
 •    Access to all subject  area modules in CERCLIS (e.g., Risk Assessment, Remedy  Selection, etc.) to view all
     technical and administrative data pertaining to a site.

 July  1, 1998                                        E-2

-------
                                                                             OSWER Directive 9200.3-14-1E


  Community Involvement

  To support the community involvement process, WasteLAN supports the following activities:

  •   Enter and access online directions to the site;
  •   Enter and view information on public meetings, including public meeting location and directions;
  •   Access current site information from any user view;
  •   Enter and view the address of site information repositories and identify which repositories contain Administrative
     Records; and
  •   Export site locational data for use in developing maps in GIS packages.

  Removal

  To support the removal process, WasteLAN supports the following activities:

  •   Document OSCs  assigned to the removal, EPA branch, operable unit name, incident category, event qualifier,
     attorney assigned  to the removal, event category, planning status, removal media, and site funding rank;
  •   Track Action Memo types, support the Action Memo approval process, and capture response action scientific and
     location information;
  •   Develop removal  fact sheets;
  •   Assist in the management of removal budgets for various contract vehicles and other EPA costs;
  •   Enter and store regional removal assessment detail description information including date assigned to OSC, where
     the site was referred from, referral date, response date, site visit date, OSC assigned, removal media, and flags for
     sampling performed, eligibility for removal, referred to remedial program office, and returned to State;
  •   Generate regional cost/financial management reports; and
  •   Create Headquarters removal reports (e.g., reports that replicate current mainframe reports).

  Enforcement

 To support the enforcement process, WasteLAN supports the following activities:

  •   Capture and retrieve information about PRPs (the "PRP Profile") and associate PRPs with all sites and enforcement
     actions with which they have been involved;
 •   Generate PRP-related summary statistics;
 •   Group PRPs for enforcement actions or correspondence mailings;
 •   Document a PRP's involvement with a site;
 •   Track liens against a PRP's property;
 •   Track PRP compliance with letters and settlement terms;
i •   Track negotiations, including type of, response actions sought, cost recovery amount sought, and outcome;
 •   Track ADR usage, identifying sites where ADR was used, the outcome of the ADR, and the mediator used;
 •   Track settlements, including type of response actions to be performed by the PRPs, statutes, and cost recovery
     amount achieved, and identify full or partial settlements;
     Log case files, including EPA Docket and DOJ case numbers and names and district court location docket number;
 •   Track referrals, including the type of referral, statutes, response actions sought, cost recovery amount sought, and
     outcome;
 •   View costs written off and the rationale behind a decision not to pursue cost recovery; and
 •   Track oversight costs.
                                                   E-3                                         My i, 1998

-------
OSWER Directive 9200.3-14-1E

Project Management

To support site management, WasteLAN supports the following activities:

•   Maintain schedule by project segment and set a default project segment for site schedules;
•   View and edit action-specific information including operable unit, sequence number (system generated), lead,
    planned and actual start/complete dates, and planned start/complete Fiscal Year/Quarter (system generated); and
    add and delete actions and new operable units to/from the schedule;
•   View the targeted Fiscal Year/Quarter for actions defined as regional targets;
•   Generate custom planned complete dates based on user-defined durations, or system generate planned complete
    dates based on preset durations;
•   Define associations among actions and add "public" or "private" user-defined actions to schedules;
•   Reorder actions on the schedule and create what-if scenarios by "cascading" planned dates (automatically updating
    subsequent dates based on a schedule change);
•   Add and view action-specific comments;
•   Prepare Gantt charts, generate reports such as a Site Summary report, a Management Review report, and a Target
    Comparison report, and create/print weekly "notes" to keep managers apprised of "hot" issues;
•   Access Smart screens, which provide online SCAP definitions;
•   View financial data by site, action, or financial transaction and track Superfund State Contracts (SSC) cost share
    payment information; and
•   Allow reviewers (e.g., Section Chiefs) to approve or disapprove schedule changes and financial  transactions before
    they become official and notify RPMs if any of their sites have been reviewed.

Program Management

To support overall program management, WasteLAN supports the following activities:

•   View allowance and budget information for a comparison of regional spending plans to the negotiated budget for
    each allowance;
•   Record and access all site and non-site financial details associated with an allowance;
•   Track allowance change requests by viewing existing change request data used to issue/reprogram an allowance and
    generate a new change request online;
 •   View aggregate site planning data to support program planning and reporting measures and access data on a national
    (at Headquarters only), regional, branch, or section level, or by program office;
 •   Access project schedule details for sites included in the aggregated information on planning and reporting measures
    and identify target candidates;
 •   Track progress in meeting targets and planning estimates, view details on target and alternate sites that support these
    targets/estimates for each planning and reporting measure, and substitute target and alternate sites when necessary;
 •    Identify the funding priority for RAs and Removals based on factors such as the status of PRP negotiations, whether
     the RD has reached 95% complete, and estimated cost;
 •   Associate sites with a specific national and/or regional priority; and
    Enter El data at the site/action level,  and view summary information for Indicators A, B, and C at the national (at
     Headquarters only) and regional levels.


 SUPERFUND DATA ARCHITECTURE

 The Superfund data architecture is comprised of various components that reside in the Regions or at Headquarters. The
 goal of this architecture is to allow regions, the data owners, to enter data locally while still ensuring a national database
 is maintained for national reporting purposes.

 Exhibit E-1 outlines the relationship among various components of the Superfund data architecture. Each Region
 enters their information into the Regional WasteLAN system.  Each night, data from the Regional systems are sent


 July  1, 1998                                        E-4

-------
                                                                        OSWER Directive 9200.3-14-1E

via the "snapshot" process to the Agency Information Management (AIM) repository, which is the Superfund
program's comprehensive data repository. Data from AIM is then divided into different, single purpose datasets to
meet specific needs of the program.  These datasets include, but are not limited to:

 •  CERCLIS 3: This dataset contains active sites and related program management information tracked through the
    SCAP process.

 •  FOIA: This dataset contains active sites and related information that is releasable to the public.

 •  Archive: This dataset contains archived sites and related information.

 •  Others, as needed: Additional datasets can be created to meet additional program needs and special initiatives as
    they are defined. For example, a "Pre-Discovery" dataset could be created to track information on sites prior to
    beginning the listing process.


In addition, each day, financial data from the Integrated Financial Management System (IFMS) is transferred via AIM
to the Regional WasteLAN databases.
                                           EXHIBIT E-l
                               SUPERFUND DATA ARCHITECTURE
    Regional WasteLAN
National IFMS
  Data from
    FMD
                                                                            Headquarters
         WasteLAN
            (C3PR)
                                                    ,   Agency
                                                    Information
                                                    Management
                                                    ^ -.(AIM) *
                                                    Repository
                                                                            Other Initiatives
                                               E-5
                                                                                        July 1, 1998

-------
OSWER Directive 9200.3-14-1E

REPORTING SUPERFUND INFORMATION
                 	ii            ,                  i                              I
    The WasteLAN Reports Module is accessible by all users, and will contain both nationally- and Regionally-defined
reports.  The reports are categorized by the following program areas: Site Assessment, Risk Assessment, Remedy
Selection, Federal Facilities, Community Involvement, Removal, Enforcement, Project Management, and Program
Management. Headquarters program managers and staff will have access to the database and the ability  to use the
application to display data and print reports. In many cases the application can be used by program managers in lieu of
contacting regional staff.
                                                                                  i
    Reports  in the Reports Module are being developed from a Select Logic Database  (SLDB).  The SLDB is a
warehouse of select logic queries; because each query has been created using pieces of reusable code (RC), the select
logic stored in the SLDB can be reused across multiple reports. The SLDB approach to developing reports has many
benefits.  By reusing select logic queries that have already undergone testing and validation, the  SLDB approach
promotes consistency and accuracy in program-wide reporting. In addition, because all select logic queries reside in
one location, the effort required to maintain the Reports Library is significantly reduced.

    The SLDB  stores nationally- and Regionally-defined queries.  Queries that are  nationally defined and used in
national reports will be tested and validated by third-party testers.  National queries will be sponsored by query owners
at Headquarters. Query owners are responsible for updating queries in a timely manner  when new system requirements
are established to ensure that queries remain consistent with programmatic changes.

    The Regions can use national queries from the SLDB for Regional reporting purposes. The Regions also have the
ability to develop and store Regionally-defined queries in the SLDB. Regionally defined queries and reports are
managed and maintained by the Regions themselves. The Reports Steering Committee is currently working on
developing a process for developing and sharing queries and reports between Regions.

     If a particular report is similar in several Regions, that report may be identified as a candidate for a national report.
Also, if a Regional query is identified for national implementation, the query will be validated, tested, and released as
a national query. National  queries and reports are managed by the Headquarters Reports Librarian.

     The Reports Librarian role has been expanded to include the coordination and management of all national queries
and reports.  The Reports Librarian will continue to coordinate with query and report owners and developers, ensuring
 that reports and queries are developed consistently, in accordance with standards, and  third-party tested. It is also the
Reports Librarian's responsibility to see that all national queries and reports are unique (but reused when appropriate)
and released to the user community on schedule.

     The  Reports Librarian  is  responsible  for coordinating  all steps  of the reports development  life cycle:
 requirements/design, specifications, coding, testing, maintenance, change management, standards development/adherence
 and documentation. This includes coordinating and facilitating bi-weekly Reports Status meetings with the reports team,
 maintaining the Lotus Notes Reports Status database, and communicating status with the reports community.

     The Reports Librarian coordinates the addition of new national and/or HQ reports to the database. This process is
 framed by the forms available in the Reports Status Notes Database: the Reports Request form; Specifications, Code
 Delivery form; and the Sign-off form.   The Reports Librarian ensures the Reports Request form  is  completed
 comprehensively and that the report being requested is not duplicative of an existing report.  The Reports Librarian
 ensures that specifications are completed prior to a report being installed on the national menu, and assists in the
 coordination of hanging a report by ensuring that all the information on the Code Delivery form is completed by the
 reports developer. It is the Reports Librarian function to ensure that the process is documented by ensuring that the
 Sign-Off form  is completed.  All members of the reports community can contact the Reports Librarian for  status
 information on any national and/or HQ report.
 July 1, 1998                                        E-6

-------
                                                                            OSWER Directive 9200.3-14-1E

     In addition to coordinating the addition of new reports, the Reports Librarian is responsible.for monitoring changes
 to existing national and/or HQ reports and deleting obsolete reports from the menu. This means coordinating with the
 development team at large on behalf of the reports team.  Attending Configuration Control Board meetings, reviewing
 change requests and monitoring regional comments in Lotus Notes, the suggestion box and e-mails are some of the
 methods used by the Reports Librarian to monitor changes. Usage reports and feedback from the regions and HQ are
 the methods used to determine obsolescence of a report.

 WasteLAN Users

     The WasteLAN application is for use by EPA staff with Superfund program responsibilities.  The information
 collected via the application is for unrestricted use by all parties except for that portion of the information identified as
 sensitive and not releasable under FOIA.                                                           •
APPLICABILITY OF THE FREEDOM OF INFORMATION ACT

Reports Releasable under Freedom of Information Act (FOIA)
                                                                        i
    There is a set of system-generated reports that have sensitive information (records or information that are protected
under FOIA and cannot be released to the public) removed and may be released under FOIA. These reports include:

            SCAP 11 (Site Summary Report for NPL Sites);
         •   SCAP 12 (Site Summary Report for Non-NPL Sites);
         •   List 8E (Site/Response Action Listing Report/External);
         •   List 8T (Site/Event Listing, Archived Sites);
         •   List 9 (Site Comprehensive Listing);
         •   Enforcement 10 (The Settlements Master Report Public Version); and
         •   Enforcement 25 (Administrative and Unilateral Orders Issued).

Note: The SCAP 11, SCAP 12, List 8T, and List 9 are currently available to the public on the Superfund Home Page.

    In addition, the Records of Decision System (RODS) may be released under FOIA. It provides the justification for
the remedial action (treatment) chosen under the Superfund program and stores information on the. technologies being
used to clean up sites.

Sensitive Information Not Releasable under FOIA

    FOIA is intended as a disclosure law, not a withholding law.  In handling all FOIA requests, there should be a
presumption in favor  of releasing information.  There are certain types of information, particularly enforcement
information, that have been designated as confidential and, therefore, are not releasable to the public because disclosure
could cause significant harm to the Agency., All planning data fit into this category including:

        •   Section 106 and 107 litigation and Consent Decrees (CD) and all related information where the planning
            information indicates that the action has or will be referred to Headquarters (HQ) or to the Department of
            Justice (DOJ). If the case is filed, the information may be released.

        •   Potentially Responsible Party (PRP) lead Remedial Investigation/Feasibility Study (RI/FS) projects and
            all related information where only planning data exist. If there is an actual PRP  RI/FS start, the planned
            completion date (Fiscal Year/Quarter)  can be released.  However, no subsequent response dates are
            releasable.
                                                  E-7                                       My 1, 1998

-------
OSWER Directive 9200.3-14-1E

        •   Remedial Design (RD)/Remedial Action (RA) - Administrative Order/CD and all related information
            where only planning data exist. This information is only releasable where an actual completion date exists.

        •   Planned obligation amounts related to Regional enforcement extramural budget activity associated with
            the following activities:

                 Litigation (106, 106/107, 107) support;
                 Removal Negotiations;
                 Non-NPL and NPL PRP search;
                 RI/FS negotiations;
                 RD/RA negotiations; and
                 Cost recovery negotiations.

        •   RD and RA planned events where the lead is the RP with no actual starts. When there is an actual start,
            the planned completion can be released.

        •   RI/FS and RD/RA negotiations planned start and completion dates.  When there is an actual start, the
            planned completion can be released.

        •   Planned removal/remedial obligations.

        •   All planned activities for sites that have not been designated as final or proposed NPL sites in the Federal
            Register.

The following enforcement data also cannot be released:

        •   Information pertaining to the financial viability of PRPs.

        •   Comments

        •   PRP identification under Section 104(e)

        •   Compliance data

This following information is protected from mandatory disclosure by the following FOIA exemptions and provisions:

         •   EXEMPTION  7: Records  or  information compiled for law enforcement purposes.   Specifically,
            EXEMPTION 7 (a) - could reasonably be expected to interfere with enforcement proceedings.

         Exemption 7 - Records or Information Compiled For Law Enforcement Purposes
         This  exemption provides that records or  information compiled for law enforcement purposes need  not be
         disclosed in six specific  instances.  Even though a document falls under Exemption 7, the  Agency, in its
         discretion, encourages release of the document unless release would significantly harm the Agency.  Under this
         section, records or information can be withheld  from disclosure if:

                 Exemption 7 (a) - Disclosure could reasonably be expected to interfere with enforcement proceedings.
                 Harm to the government's case in court by premature release of evidence or information or damage
                 to the Agency's ability to conduct an investigation constitutes interference under the exemption.

                 Exemption 7 (b) - Disclosure would deprive a person of a right to fair trial.


 July 1,1998                       '                 E-8

-------
                                                                             OSWER Directive 9200.3-14-1E

                Exemption 7 © - Disclosure could reasonably be expected to constitute an unwarranted invasion of
                personal privacy.

                Exemption 7 (d) - Disclosure could reasonably be expected to disclose the identity of a confidential
                source. This includes protection of information provided by the source on a criminal law enforcement
                investigation.

                Exemption 7 (e) - Disclosure would reveal a special technique or procedure for law enforcement
                investigations or prosecutions.

                Exemption 7 (f) - Disclosure could reasonably be expected to endanger the life or safety of any person.

As a result of 1986 Amendments to FOIA Exemption 7, the general coverage of Exemption 7 is no longer investigatory
records but records of information compiled for law enforcement purposes.  As long as some law enforcement authority
exists and the record meets the threshold test for exemption 7, the record need no longer reflect or result from specifically
focused inquiries by the Agency.

        •   EXEMPTION 5: Privileged Interagency or Intra-Agency Memoranda. Specifically, EXEMPTION 5,
            Privilege 1 - Deliberate Process Privilege, and EXEMPTION 5, Privilege 4 - Government Commercial
            Information Privilege.

    Exemption 5 - Privileged Interagency or Intra-Agency Memoranda
    Intra-agency records include reports prepared by outside consultants at the request of the agency. Recommendations
    from State officials to Environmental Protection Agency (EPA) may be considered intra-agency records when EPA
    has solicited State comments, has a formal relationship with the State, and the records concern a specific deliberative
    process.

        This exemption allows the Agency to withhold from disclosure interagency or intra-agency memoranda or
    letters which fall under the following privileges:

                •    The Deliberative Process  Privilege protects  the quality of the Agency's decision-making process
                     (i.e., to protect against premature disclosure of proposed policies before they are adopted), to
                     encourage candid discussions among Agency officials, and to avoid premature disclosure which
                     could mislead the public.

                Only pre-decisional, deliberative documents may be withheld. These are written prior  to the
                Agency's final decision, and are not likely to be those that are written by a person with  final
                decision-making authority. Drafts of documents usually fall under this category, and documents
                transmitted between the government and third parties during settlement negotiations are
                occasionally protected under this privilege.

                The deliberative process privilege does not allow the withholding of purely factual portions of
                documents.  These portions must be released if they can be segregated from the remainder of the
                document (partial denial). This requirement presents a problem where the facts themselves reflect
                on the Agency's deliberative process; in this instance, the factual portions may be withheld.

                •    The Attorney-Work  Product  Privilege allows the withholding of  documents  prepared in
                     anticipation of possible litigation. Litigation need not have commenced but it must be reasonably
                     contemplated.  This privilege does not extend to purely factual documents unless they reflect the
                     results of an attorney's evaluation.
                                                   E-9                                        July 1, 1998

-------
OSWER Directive 9200,3-14-lE

                 «    The Attorney-Client Privilege applies to confidential communications between attorney  and
                     client, including communications between an Agency attorney and Agency employee.

                 »    The  Government Commercial  Information Privilege  is available  to the government  for
                     information it generates in the process leading up to the award of a contract.  This privilege
                     expires once the contract is awarded or upon withdrawal of the contractual offer. An example of
                     this privilege is cost estimates prepared by the government and used to evaluate the construction
                     proposals of private contractors.

                 •    Trie Expert Witness Privilege is commonly invoked to allow the withholding of records generated
                     by an expert witness.

                 •    The Confidential Witness Statement Privilege allows  statements obtained from confidential
                     witnesses to be withheld.

    The Agency encourages the discretionary release of documents falling under any of the privileges, unless release
would significantly harm the Agency's decision-making process. All of the privileges may be waived if the Agency has
disclosed the document to third parties.

    The sensitive information listed above covers the information restricted from public disclosure as of the compilation
of this Manual. Additional  information may be added  to this category and information may be restricted in specific
instances (though  the prior disclosure rule must be satisfied). If requested information is potentially able to be restricted
under a FOIA provision (in this case, under Exemptions 5, or 7),  the official receiving the request should contact the
appropriate FOIA office to determine whether the information should be restricted.  Recently, a letter was sent to the
Regions requesting  their input  as  to  what  information should be considered enforcement sensitive  and, thus,
non-FOIAable. After Regional feedback has been analyzed, and guidance has been finalized, more detailed information
will be provided.

Ad Hoc Reporting
                                                                                   i
    In general, all Regional requests for ad hoc reporting, a special request for records, or information that is not  part
of the approved public reports should be referred to the  Office of Site Remediation and Enforcement (OSRE) Director
immediately. The Regional official receiving the request should inform the  requestor of this policy and advise the
requestor to contact HQ for a decision on whether this information may be released. If the requested information is only
available from a specific Region, and HQ has decided to release this information, HQ will inform the responsible Region
that the information should be compiled and disclosed  to the requestor.

Ad hoc reporting requests should be treated like FOIA requests. And the following guidelines apply:

•   If the information is protected under one of the FOIA exemptions, the information will not  be disclosed (except in
    cases of discretionary release).

•   Absent FOIA exemption protection, the information will be disclosed if it can be compiled or  obtained  in a
    reasonable amount of time by an Agency employee familiar with the subject area.

•   Fees for ad hoc reporting requests will be charged in accordance with the fee structure used for FOIA requests.
 July 1,1998                                        E-10

-------
                                                                            OSWER Directive 9200.3-14-1E

Accessing FOIA Information

There are several methods to access FOIA reports.

•   On the Internet, via the World Wide Web,  several standard  reports can be downloaded from the Superfund
    Information home page (http://www.epa.gov/superfund/), accessed under the header "Standard Site Reports."  To
    view downloaded reports, use the Report Browser, a DOS-based browsing tool, also available from the home page.
    Standard reports include:

        Inventory of WasteLAN  and Archived Sites by State.  This report displays the number of sites by
        State/possession that are currently in WasteLAN; it also displays the number of sites by State/possession that
        have been archived or require no further  remedial action.

        List 8T- Archive (NFRAP) Listing.This report lists all sites that were previously listed as contaminated or were
        suspected of being contaminated, but have subsequently been cleared  of co'ntamination or are no longer
        suspected of contamination.  The report lists the sites/incidents, addresses, and Congressional districts, and the
        remedial, removal, and community relations events associated with each site/incident.  This report was
        previously called the "Transition Site/Event Listing."

        List 9- Site Comprehensive Listing. This report lists all Superfund sites/incidents, addresses, and Congressional
        districts, and the remedial, removal, and community relations events associated with each site/incident.

        SCAP 11- Site Summary Report for NPL Sites.This report provides detailed information on Superfund
        sites/incidents on the  National Priorities List (NPL).  Only the sites/incidents that have planned or actual
        remedial/removal activities are selected for inclusion on the report.  The remedial/removal activities (planned
        or actual) as well as the enforcement activities (actual) related to each site/incident are listed.

        SCAP 12- Site Summary Report for Non-NPL Sites. This report provides detailed information on Superfund
        sites/incidents that are not on the NPL.  Only the sites/incidents that have planned or actual remedial/removal
        activities are selected for inclusion on the report. The remedial/removal activities (planned or actual) as well
        as the enforcement activities (actual) related to each site/incident are listed.

•   The Superfund Automated Phone and Fax Information System (1-800-775-5037) is an interactive phone/fax system
    that provides information about WasteLAN and the Record of Decisions  System (RODS). By following voice
    prompts, the Superfund Automated Phone System allows users to request List 8T, List 9, SCAP 11, and SCAP 12
    reports on diskette.  Paper copies of these reports may also be requested using the Superfund Automated Phone
    System. Some products can be delivered immediately by fax; other products must be mailed.

•   FOIA requests may also be submitted to a Region or HQ office for any one of the FOIA reports.  FOIA report
    requests should include the state, zip code, county, and/or city they are requesting, as well as which FOIA report
    they want.

•   Enforcement 10 (The Settlements Master Report  Public Version) and  Enforcement 25 (Administrative and
    Unilateral Orders Issued) are available by contacting OSRE. These reports  are not available from Superfund's
    World Wide Web site or the Superfund Automated Phone and Fax Information System.
                                                   E-ll                                        My 1,1998

-------
 OSWER Directive 9200.3-14-1E
                                                                                 !

 DATA OWNERS/SPONSORSHIP

     HQ Senior Process Managers (SPMs) are taking an active role in improving the quality of data stored in WasteLAN
 by acting as data sponsors. Data sponsors ensure that the data they need to monitor performance and compliance with
 program requirements is captured and stored properly in WasteLAN.  To meet this goal, HQ data sponsors identify their
 data needs, develop data field definitions, distribute guidance requiring submittal of these data, and oversee the process
 of entering data into the system. In addition, sponsors support the development of the requirements for electronic data
 submission (EDS).

     Data sponsorship promotes consistency and communication across the Superfund program. HQ data sponsors
 communicate and gain consensus from data owners on data collection and reporting processes. Periodically, data
 sponsors will verify the data entered and maintained by the Regions through focused data studies.

     HQ data sponsors assist data owners in maintaining and improving the quality of Superfund program data.  These
 data are available for data evaluation and reporting. Data sponsorship helps promote consistency in both national and
 Regional reporting. In addition, it provides a tool to improve data quality through program evaluation and adjustments
 in guidance to correct weaknesses detected.
July 1, 1998
E-12

-------
                                            OSWER Directive 9200.3-14-1E
  Superfund/Oil Program Implementation Manual FY 99/00




Appendix F:  Oil Pollution Prevention and Response Program
                                                        July 1, 1998

-------
 OSWER Directive 920Q.3-14-1E
                                        This Page Intentionally
                                              Left Blank
July 1, 1998

-------
                                                                   OSWER Directive 9200.3-14-1E

                                         Appendix F
                      Oil Pollution Prevention and Response Program

                                      Table of Contents

OIL POLLUTION PREVENTION AND RESPONSE PROGRAM PRIORITIES	F-l
    Overview	F-l
    Oil Program Initiatives 	F-l
       Addressing Above-Ground Storage Facility (ASF) Leakage and Contamination 	F-l
       Implementing FRPs	F-l
       Implementing the NCP	F-2
       Developing and Maintaining Data Systems	F-3
       Improving the SPCC Program	F-3
       Coordinating with Other Agencies	F-4

    Oil Spill Prevention and Cleanup Activities	F-4

OIL POLLUTION PREVENTION AND RESPONSE PROGRAM PLANNING AND
REPORTING REQUIREMENTS	,	.F-5
    Overview	F-5
    National Oil and Hazardous Substances Pollution Contingency Plan	F-5
    Regional Contingency Plans	F-5
    Area Contingency Plans . .	F-5
    Federal Response Plan	F-6
    Communications Requirements Associated with a Release	 F-7

OIL POLLUTION PREVENTION AND RESPONSE PROGRAM FINANCIAL MANAGEMENT	F-8
    Overview	F-8
    Budget Formulation	F-8
    Operating Plan Development	F-8
    Budget Execution 	F-8

OIL POLLUTION PREVENTION AND RESPONSE PROGRAM FY 99/00 MEASURES	F-l 1
    Overview	F-l 1

OIL POLLUTION PREVENTION AND RESPONSE PROGRAM DEFINITIONS 	F-12
    Prevention/Preparedness Measures: 	F-12
       Spill Prevention, Control,  and Countermeasure (SPCC) Inspections and Plan Reviews	F-12
     .  Spill Prevention, Control,  and Countermeasure (SPCC) Facilities in Compliance  	F-12
       Oil Facility Response Plans Reviewed and Approved	F-13
       Area Contingency Plans	F-13
       Preparedness for Response Exercise Program (PREP) Area Drills	,	F-l4
    Response Measures	;	F-14
       Oil Spill Notifications	F-14
       Oil Spill Investigations/Preliminary Assessments 	F-15
       Oil Spill Cleanups	F-15
       Oil Spill Monitoring/Directing	F-16
       Cost Documentation	F-16
                                                                                    July 1, 1998

-------
OSWER Directive 9200.3-14-1E

                                           Appendix F
                       Oil Pollution Prevention and Response Program

                                   Table of Contents (cont'd)

    Enforcement Measures  	F-17
        Administrative Penalty Enforcement Actions for Spill Violations and Prevention Regulation
        Violations	F-17
        Judicial Penalty Enforcement Actions for Spill Violations and Prevention Regulation Violations	F-17
        Orders for Removal Issued to a Responsible Party  	F-17
July 1, 1998

-------
                                                            OSWER Directive 9200.3-14-1E

                                    Appendix F
                    Oil Pollution Prevention and Response Program

                                   List of Exhibits

EXHIBIT F.I RELATIONSHIP OF OIL POLLUTION PREVENTION AND
RESPONSE PROGRAM PLANS 	F-6

EXHIBIT F.2 FY 99/00 OIL POLLUTION PREVENTION AND RESPONSE PROGRAM ACTIONS	F-l 1
                                                                           July 1, 1998

-------
 OSWER Directive 9200.3-14-lE
                                        This Page Intentionally
                                              Left Blank
July 1, 1998

-------
                                                                          OSWER Directive 9200.3-14-1E
                                            APPENDIX F
                     OIL POLLUTION PREVENTION AND RESPONSE
                                     PROGRAM PRIORITIES
OVERVIEW
    The Agency shares responsibility with the United States Coast Guard (USCG) and other agencies for implementing
major provisions of the Clean Water Act (CWA) and the Oil Pollution Act of 1990 (OPA). EPA will work on finalizing
proposed revisions to the Oil Pollution Prevention regulation, also known as the Spill Prevention, Control, and
Countermeasure (SPCC) regulation; work the facilities on ensuring compliance with the SPCC regulation; continue the
review, inspection, and approval of facility response plans (FRP); continue the development and improvement of area
contingency plans (ACP) and participation in area drills and other exercises; and respond to oil spills, or direct, monitor
or support others' responses, in accordance with the National Oil and Hazardous Substances Pollution Contingency Plan,
or NCP. In addition, Regional offices will assist State Emergency Response Commissions (SERCs), Tribes, and Local
Emergency Planning Commissions (LEPCs) in coordinating and linking ERPs with Community Response Plans (CRPs)
developed pursuant to the Emergency Planning and Community Right Act of 1986 (EPCRA).


OIL PROGRAM INITIATIVES

    In Fiscal Year (FY) 99/00, the Office of Solid Waste and Emergency Response (OSWER) will focus on addressing
the following: above-ground storage tank/facility leakage and contamination; overseeing the continued implementation
of FRPs through review, approvals, and inspections; overseeing implementation of the oil spill response provisions of
the revised NCP; developing and maintaining data systems; improving the Spill Prevention Control and Countermeasures
(SPCC) Program; conducting EPA-lead  area exercises and participating in industry-lead inland area  exercises, and
enhancing coordination within and between government agencies. These initiatives, which will improve response and
enforcement activities related to oil spills and leaks, are described in more detail in the remainder of this section.

Addressing Above-Ground Storage Facility  (ASF) Leakage and Contamination

    In FY 96, the Agency completed a study to determine whether liners or other secondary containment means will help
prevent and detect leaks at above-ground storage facilities. As a result of this study and related  research, the Agency
will propose initiation of a cooperative program for industry, States, and environmental groups to investigate existing
contamination, current facility design and procedures, and possible initiatives for contamination prevention and cleanup.
EPA will also seek to initiate a pilot program while the proposal is pending.

Implementing FRPs

    The OPA of 1990 requires that certain facility owners and operators prepare plans to respond to worst-case
discharges of oil or a substantial threat of such  a discharge. Owners/operators of such "substantial harm facilities"
must submit their plans or stop handling,  storing, or transporting oil. To ensure that such plans are implemented and
response readiness maintained, OSWER will engage in the following activities:

•   Coordinate  with the Office of Enforcement and Compliance Assurance (OECA) on Oil Program Enforcement
    of the Spill Prevention Control and Countermeasures (SPCC)/FRP Rule — The primary goal of this initiative is
    to ensure that Program regulations, policy,  implementation, and enforcement are consistently applied and support
    the same basic program objectives.
                                                  F-l                                        July 1, 1998

-------
OSWER Directive 9200.3-14-1E

•   Implement Inspector Training to Ensure Consistent Implementation and Enforcement of the SPCC Prevention
    and Response Program — The goal is to give training to all EPA Regions to achieve nationally consistent
    inspection of SPCC and FRP facilities.

•   Develop Preparedness Response Exercise Program (PREP) Guidance/Scheduling — To ensure that facilities are
    able to fully implement their FRPs, the OPC will provide guidance on procedures and scheduling of periodic
    exercise sessions during which a facility puts into practice its FRP and ensures its effectiveness.

•   Continue to Review FRPs and  Inspect Facilities — Inspections of facilities and FRPs will continue.  FRPs
    submitted after 2/18/93 will have to be reviewed, inspected, and approved.  The 5-year cycle of review and approval
    of the FRP also will continue. The OPC also may observe internal facility drills/exercises.

Implementing the NCP

    The revised NCP of 1994 implements several new regulations that directly affect the policies and procedures
governing the Oil program. The NCP also redefines the roles and responsibilities of several program offices within the
Oil program.  These new regulations include a revision of Subpart J, which outlines technical requirements for chemical
countermeasures, approval, and use on oil spills. They also include requirements for ACPs that ensure efficient responses
to potential worst-case oil spills or discharges.  The Oil Spill Program will have an integral role in the implementation
of Subpart J and the monitoring of ACPs, and will be assisted by several other offices in these efforts. The following
activities will be implemented as a result of the revised NCP:

•   Response—In  accordance with the NCP, EPA will respond to all oil spills to U.S. waters in the Inland Zone that
    are beyond the response capabilities of the Responsible Party and the state or local responders, or that otherwise
    require a Federal response.  In addition, EPA will monitor or direct the response by others, as  appropriate, or
    provide various types of technical and response support.
                                                                                  ,
•   Subpart J — Subpart J of the NCP requires EPA to prepare a product schedule of dispersants, chemicals, and other
    spill mitigating devices and substances, if any, that may be used in carrying out the NCP. Regional Response Teams
    (RRTs) and Area Committees (ACs), whose members are appointed by the President and consist of personnel from
    qualified Federal, State and local agencies, will address as part of their planning activities the desirability of using
    dispersants, surface washing agents, surface collecting agents, bioremediation agents, or miscellaneous spill control
    agents such as those listed on the NCP product schedule.  This effort requires submission of effectiveness and/or
    toxicity testing for all product categories currently listed on the NCP product schedule. The Oil Program conducts
    validation testing for all dispersants.
                                                                                :
    The OPC is responsible for coordination, correspondence, and product review in support of Subpart J initiatives.
    In addition to this role, the OPC provides outreach to vendors, RRTs, and the general public regarding the use of
    chemical countermeasures.
                                                                                :  i         .    .
•   Enhance the OPC's Involvement in Area Planning — The OPC works with the Chemical Emergency Preparedness
    and Prevention Office (CEPPO) by monitoring area contingency planning efforts to ensure that they are providing
    the necessary  link between the FRPs and the NCP, and that all contingency plans are coordinated to control a
    worst-case discharge of any size. OPC and CEPPO will ensure that plans are integrated and compatible, to the
    greatest extent possible, with all appropriate response plans of State, local,  and non-Federal entities, and especially
    with Title IE local emergency response plans.
July 1, 1998                                        F-2

-------
                                                                            OSWER Directive 9200.3-14-IE

Developing and Maintaining Data Systems

    The availability of complete and comprehensive data on oil spill incidents and facilities is an integral component
of the Oil program's planning and response efforts. During the upcoming year, the Oil program will focus its efforts in
this area on the further development of pilot projects may lead to a new comprehensive Oil program database that records
and track information on incidents (spills) and facilities.  The program also will continue to  maintain the current
Emergency Response Notification  System (ERNS), so that release notification  information on oil and hazardous
substances can be accessed quickly and efficiently. To achieve these goals, the Oil program will engage in the following
activities:

•   Collection of Environmental Data — Oil Spill Program will continue to assist the Regions in  gathering spatial data
    for area contingency planning purposes. This data will include environmentally sensitive areas, such as wetlands,
    drinking water intakes, endangered species locations and similar areas.  Oil Spill Program also will work with the
    Regions to incorporate this data and other spatial data, such as facility locations and spill locations, into a useable
    geographic information system (GIS) format, for both planning and response support purposes.

•   Develop Oil Information Management tools — The Oil program information system will  be developed for the
    purpose of recording and tracking information  on Oil program actions at a site-specific level. The  information
    system will interface with CERCLIS as necessary, and will be used primarily by the Regions to facilitate the flow
    of information within and between Regions.  The .system also will likely interface with some of the GIS applications
    described above.

•   Enhance and Maintain ERNS — ERNS provides the most comprehensive data compiled on release notification
    of oil and hazardous substances nationwide. Information should be recorded  in ERNS when a release is initially
    reported; when more specific data is verified, more detailed data on the spill should be entered into the system.

Improving the SPCC Program

    The owners/operators of any facility subject to oil pollution prevention  regulations are required to prepare and
implement a SPCC plan. Plans must detail the procedures put into place to prevent and control oil spills. To ensure that
such plans are developed and adhered to, the Office of Emergency and Remedial Response (OERR) will engage in the
following activities:

•   Facilitate Regional Consistency — The Oil program is working to facilitate consistency among the Regions in their
    implementation of SPCC inspections. (See the discussion on FRPs earlier in the chapter.)

•   Provide Regional Outreach — Regional outreach efforts will be in the form of Headquarters (HQ) support of the
    Regions' efforts to successfully implement their oversight of the SPCC program.

•   Reduce Paperwork Burden — In FY 98, the Agency proposed revisions to reduce the SPCC paperwork burden by
    over 25%.  In FY 99, OPC will work on finalizing this proposal, as well as 1991 and 1993  proposed prevention
    provisions.
                                                    F-3                                        July 1, 1998

-------
OSWER Directive 9200.3-14-IE

Coordinating with Other Agencies

    The success of the Oil program relies heavily on the continued cooperation of several different agencies including
the United States Coast Guard (USCG), the Department of Transportation (DOT), the Minerals Management Service
(MMS), the National Oceanic and Atmospheric Administration (NOAA), and the Department of the Interior (DOI).
Cooperation among these agencies ensures the efficient implementation of the NCP and FRP rule. To better instill this
cooperation, a national bulletin board that will provide a means to share information on oil spill prevention and responses
will be developed, a Memorandum of Understanding (MOU) with the USCG will be prepared, and model MOUs for
Regions/States will be developed.


OIL SPILL PREVENTION AND CLEANUP ACTIVITIES

    HQ and the Regions will continue to work to decrease the environmental damage caused by oil spills. The following
measures will be taken in an effort to prevent oil spills:

•   Targeting Inspections at the Higher Risk Facilities — Where inspections disclose violations, enforcement actions
    will be taken in an effort to prevent problems before they occur.

•   Increasing the Amount of Cost Recovery Documentation submitted to NPFC following completion of spill
    response efforts.

•   Planning and Conducting Responses to  Oil Spills — Response actions  will be conducted with the goal of
    minimizing pollution and subsequent environmental damage, including increasing the number of removal orders
    issued.

•   Increasing the Number of Enforcement Penalty Actions taken as a result of oil or hazardous substances discharge.

•   Evaluating the Agency's Response to Spills to determine the most appropriate response to spills of varying severity.

•   Improving the Science of Oil Spill Response Through Efforts with Other EPA Offices and Industry Groups to
    Sponsor Such New Technologies as In-Situ Oil Burning and Surface Cleaning Agents — The Oil program will
    work through the National Response Team (NRT) to address national oil issues including participation in the
    Science and  Technology,  Preparedness, and Response Committees.  The  OPC will  participate in special
    projects/reports  such as a proposal for the review and approval of response plans to be done by the Federal
    On-Scene Coordinator (OSC) with jurisdiction for response.
July 1, 1998                                       F-4

-------
                                                                        OSWER Directive 9200.3-14-1E

             OIL POLLUTION PREVENTION AND RESPONSE PROGRAM
                     PLANNING AND REPORTING REQUIREMENTS

OVERVIEW

    In FY 99/00, the Oil Pollution Prevention and Response Program will continue to work on the further refinement
of its planning,  prevention, and response activities and incorporation of these activities into the existing National
Response System (NRS) framework.


NATIONAL OIL AND HAZARDOUS SUBSTANCES POLLUTION CONTINGENCY PLAN

    The cornerstone of the Oil program's planning activities is the revised NCP, which outlines procedures and
responsibilities for addressing potential oil and hazardous substance spills and discharges. This plan coordinates with,
and is bolstered by, a number of similar Federal contingency plans, all of which are capable of handling "worst case
discharges" of varying sizes and magnitudes. Exhibit F. 1 displays the relationship of the Oil Pollution Prevention and
Response Program plans and their relationship with the NCP.


REGIONAL CONTINGENCY PLANS

    The Regions' plans for oil and hazardous waste spill responses are outlined in Regional Contingency Plans (RCPs).
RCPs are  developed by Regional Response Teams (RRTs) in conjunction with the States, and provide for timely,
effective,  and coordinated  responses to oil and hazardous  waste spills by  various Federal agencies  and  other
governmental organizations. In addition. RCPs must follow the format and the intent of the NCP and be coordinated
with State Emergency Response Plans (SERPs), ACPs, and the Local Emergency Response Plans (LERPs) provided for
under Title III of the Superfund Amendments and Reauthorization Act of 1986 (SARA).


AREA CONTINGENCY PLANS

    ACPs are locality-specific  oil and  hazardous waste spill  response plans.  All. ACPs are under the supervisory
authority of a federally appointed OSC, and are formulated by a body known as an Area Committee (AC). The ACs
work in conjunction with the appropriate RRTs, Coast Guard  District Response Groups (DRGs), the National Strike
Force Communication Center (NSFCC), Scientific Support Coordinators (SSCs), LEPCs, SERCs, and Tribes to ensure
consistency and prevent duplication of response efforts and responsibilities. The ACP also should be implemented in
conjunction with provisions of the NCP and be effective in responding to a worst case discharge and mitigating or
preventing a substantial threat of such a discharge from a vessel or facility operating within or near the area.  The OSC
may conduct emergency response drills to ensure that existing contingency plans and mechanisms are effective in dealing
with a potential worst case discharge.
                                                F-5                                      July 1, 1998

-------
OSWER Directive 9200.3-14-1E

                                            EXHIBIT F.I
      RELATIONSHIP OF OIL POLLUTION PREVENTION AND RESPONSE ^ROGRAM PLANS
                                       National Oil and Hazardous
                                          Substances Pollution
                                        Contingency Plan (NCP)
        International Joint Plans
                               Federal Response Plan
                                               Regional
                                           Contingency Plans
                                                (RCPs)
              Federal Agency
               Internal Plans
Area Contingency
  Plans (ACPs)
Facility Response
  Plans (FRPs)
                      State/Local Plans
               Plans of the MRS
               Points of Coordination with the NRS
               Plans Integrated with the ACP
                Vessel Response Plans (VRPs)
FEDERAL RESPONSE PLAN
                                                                                \
    If and when an oil or hazardous material spill is declared a national disaster by the President, the Federal Response
Plan is the instrument used to ensure effective response and cleanup. The Federal Response Plan is an agreement signed
by the 27 Federal  departments and agencies responsible for responding to oil and hazardous  waste spills.  It is
implemented only when an existing discharge is beyond the capabilities of the State  and local authorities and/or the
statutory authority of Federal agencies. Interagency Agreements (lAGs) may be utilized when necessary to ensure that
Federal resources will be available for a timely response to a discharge or release.
July 1, 1998
       F-6

-------
                                                                            OSWER Directive 9200.3-14-1E

         There are also several smaller governmental plans and organizations that play an integral role in the NRS.
 SERCs are responsible for designating emergency planning districts, appointing LEPCs for each district, and
 supervising the creation of LERPs in accordance with Title III, Section 303 of SARA. LERPs should be reviewed
 and updated at least once a year to ensure their accuracy and effectiveness. The SERCs and LEPCs also are
 responsible for receiving and processing information requests from the public regarding discharges or subsequent
 response actions. CRPs set forth provisions and guidelines for communication within and between communities in
 the event of a spill or discharge.  These plans should be coordinated as closely as possible with other response plans
 and ensure fluid transfer of necessary information from the lead agency to the members of the local community.

     The final components of the NRS are the SPCC Plans, FRPs, and Vessel Response Plans (VRPs), produced by
 owners or operators of facilities or vessels that are subject to the OPA. All owners and operators of OP A regulated
 facilities must produce and implement a SPCC plan, which outlines procedures for preventing and controlling oil spills.
 FRPs, which focus on reactive measures, such as how facility personnel are to respond to a discharge, are not required
 unless it is deemed that a specific facility could cause  "substantial and or significant harm"  to  the surrounding
 environment.  FRPs must be consistent with the NCP as well as with the appropriate RCPs and  ACPs, and must be
 updated periodically to ensure effective response. Finally, all "tank vessels," as defined  by section 31 l(j)(5) of the Clean
 Water Act (CWA) (as amended), must prepare and submit a VRP for responding to a worst case discharge, or to a
 substantial threat of such a discharge of oil or hazardous substances.

     An NCP  product schedule  must be  kept for all dispersants, surface  washing agents,  surface collecting agents,
 bioremediation agents, and miscellaneous oil spill control agents that may be used  in mitigating oil and hazardous
 substance spills. Under Subpart J of the NCP, effectiveness testing and/or revised toxicity  testing are required for all
 product categories listed on the NCP product schedule.


 COMMUNICATIONS REQUIREMENTS ASSOCIATED WITH A RELEASE

     The National Response Center (NRC), located at USCG HQ, is the national communications center for handling
 activities related to oil response actions. It acts as the single point of contact for all pollution incident reporting, and as
 the NRT communications center. Any oil  spills or discharges must be reported by telephone to the NRC.  The NRC is
 responsible for notifying the appropriate Federal OSC and any participating NRT member agencies of the release, and
 communicating all of the information that it has received to ensure that an appropriate response may be implemented.
 All of the information received from the initial notification report also must be entered into ERNS. This information can
 then be  used  by decision makers to solve emergency response and release prevention issues.  When notification
 information is verified, more detailed data on the release should be added to ERNS.  ERNS also  can be accessed by
 enforcement personnel to determine whether or not timely notification of spills have been reported.

     Specific reporting requirements must be met to ensure efficient communication and coordination during response
 actions. The Federal OSC must report any significant developments that occur during response actions to the RRT and
 other appropriate agencies through communications networks or other pre-approved channels. This  information should
 be made available to the trustees of  affected natural resources so that they remain informed during the course of the
 response action.  The OSC also is required to produce (if the RRT or NRT  deems it beneficial) a more detailed report
 on the removal actions taken, resources committed (financial and manpower), and problems encountered in responding
 to the spill or discharge. This report should be submitted first to the RRT, and then subsequently to  the NRT within 30
 days of its initial submission.  In addition, Title III of SARA requires the reporting of information, as it becomes
available, to community representatives that have a  stake in the response actions.  Two of the more commonly used
mechanisms for ensuring compliance with Title III requirements are the establishment of a  Joint Information Center,
 and/or an on-scene news office to report important developments as they occur. Finally, after the appropriate response
action has been implemented,  the lead agency is responsible for preparing a report that details the source of the release,
PRP involvement, and the  impacts or potential impacts on human health, welfare,  and the environment posed by the
discharge or spill.

                                                   F-7                                        July 1,  1998

-------
OSWER Directive 9200.3-14-1E

              OIL POLLUTION PREVENTION AND RESPONSE PROGRAM
                                 FINANCIAL MANAGEMENT

OVERVIEW

    The CWA as amended by the OPA established a dedicated trust fund for EPA to use for implementing many OPA
provisions. The USCG administers the trust fund.  The oil. budget, which includes oil spill prevention, preparedness,
and response is (like the Superfund budget) multi-year money that conforms to  the Agency's administrative and
programmatic budget structure.


BUDGET FORMULATION

    The Oil program's budget formulation process begins approximately 20 months before the budget execution year.
Currently, the Oil program establishes and defines goals and initiatives for the budget year in support of the Agency's
strategic plan. In line with Agency guidance, the Oil program also develops a budget strategy to achieve these goals and
establishes success. Examples include the number of oil spill cleanups.


OPERATING PLAN DEVELOPMENT

    Once the Agency receives the Oil program appropriation, development of the finalized operating plan begins. The
appropriated resources are allocated to Oil program activities, including response and regulatory support, enforcement,
emergency response teams, and prevention.


BUDGET EXECUTION

    During the budget execution year, Regions request programmatic funds for specific oil spill activities including:

•   Responding to oil spills, monitoring private party responses, and investigation oil spill notifications;

•   Conducting SPCC inspections including plan reviews, site visits, and follow-up;

•   Participating in SPCC/FRP Inspector Training in regions as students and instructors;

•   Reviewing FRPs to ensure safety and compliance and to provide early identification of potential oil spill dangers;
           1                                     '                    . .'       '
•   Inspecting FRP facilities for plan implementation as part of the 5-year review cycle;

•   Providing technical assistance to the USCG in response to coastal oil spills; and

•   Performing and participating in ACP drills through PREP.
 July 1, 1998                                       F-8

-------
                                                                            OSWER Directive 9200.3-14-IE

    HQ reprograms the funds for Regional expenditure based on required requests. Oil spill activities also are performed
by and funded directly out of HQ for such purposes as:

•   Promoting bioremediation implementation with the Regions.

 .   As the budget execution year closes, the Oil program uses actual obligations as the framework for developing the
next year's budget to ensure that the formulation process most closely reflects program trends.
                                                   F-9                                        July 1, 1998

-------
OSWER Directive 9200.3-14-IE
                                        This Page Intentionally
                                             Left Blank
July 1,1998                                     F-10

-------
                                                                    OSWER Directive 9200.3-14-IE
             OIL POLLUTION PREVENTION AND RESPONSE PROGRAM
                                   FY 99/00 MEASURES

OVERVIEW

    The following pages contain the definitions of the FY 99/00 Oil Pollution Prevention and Response Program
measures. The measures are grouped under the following three program areas: Prevention/Preparedness; Response; or
Enforcement.  Exhibit F.2 displays these Oil program actions and indicates the program area grouping under which each
measure falls. All oil program measures are reported semi-annually on a site- or facility-wide basis. Oil program
measures are not reported site-specifically.
                                         EXHIBIT F.2
          FY 99/00 OIL POLLUTION PREVENTION AND RESPONSE PROGRAM ACTIONS
MeasureName ~ - ^
Spill Prevention, Control, and Countermeasure (SPCC) Inspections
and Plan Reviews
SPCC Facilities in Compliance
Oil Facility Response Plans Reviewed and Approved
Area Contingency Plans
PREP Area Drills
Oil Spill Notifications
Oil Spill Investigations/ Preliminary Assessment
Oil Spill Cleanups
Oil Spill Monitoring/Directing
Cost Documentation
Administrative Penalty Enforcement Actions for Spill Violations and
Prevention Regulation Violations
Judicial Enforcement Actions for Spill Violations and Prevention
Regulation Violations
Orders for Removal Issued to a Responsible Party
Program Area - -,
Prevention/
Preparedness
Prevention/
Preparedness
Prevention/
Preparedness
Prevention/
Preparedness
Prevention/
Preparedness
Response
Response
Response
Response
Response
Enforcement
Enforcement
Enforcement
                                             F-ll
                                                                                    My 1, 1998

-------
OSWER Directive 9200.3-14-1E

      OIL POLLUTION PREVENTION AND RESPONSE PROGRAM DEFINITIONS

PREVENTION/PREPAREDNESS MEASURES:
                 • ,                          '                          j

SPILL PREVENTION, CONTROL, AND COUNTERMEASURE (SPCC) INSPECTIONS
AND PLAN REVIEWS

Definition:
For this measure, SPCC inspections include site inspections and SPCC plan reviews performed by EPA and/or the
support contractors. For both actions listed below, each separate facility or SPCC plan will count as a single credit, no
matter how extensive or complex the facility is.

Definition of Accomplishment:
Two actions are counted separately for SPCC inspections (Action Name = SPCC Inspections/Reviews):

•   Site inspection, which may include separate counts for an initial visit and for a follow-up compliance inspection;
    or                                   .'                      ,'"       ' '

•   The completion of the review of a written SPCC plan, as documented by the submittal of correspondence to a facility
    regarding the review of the SPCC plan.

Changes in Definition FY 98 - FY 99/00:
None.

Special Planning/Reporting Requirements:
See Definition of Accomplishment. The number of inspections and plan reviews are reported non-site specifically in
CERCLIS.


SPILL PREVENTION, CONTROL, AND COUNTERMEASURE (SPCC) FACILITIES IN
COMPLIANCE

Definition:
For this measure, SPCC inspections include site inspections performed by EPA and/or the support contractors. Each
separate facility will count as a single credit, no matter how extensive or complex the facility is.

Definition of Accomplishment:
The SPCC Plan is in compliance with the SPCC requirements of the Oil Pollution Prevention Regulation, and the SPCC
Plan has been fully implemented at the facility.

Changes in Definition FY 98 - FY 99/00:
None.

Special Planning/Reporting Requirements:
See Definition of Accomplishment. The number of facilities in compliance is reported non-site specifically in CERCLIS.
July 1, 1998                                  F-12

-------
                                                                          OSWER Directive 9200.3-14-IE

 OIL FACILITY RESPONSE PLANS REVIEWED AND APPROVED

 Definition:
 Under the OPA, facilities that store oil and have the potential to cause "substantial harm" to the environment must
 prepare a response plan for a worst-case discharge. The subset of those facilities that have the potential to cause
 "significant and substantial harm" to the environment require review and approval by EPA, although all facilities may
 be reviewed by EPA. This measure counts the number of oil Facility Response Plans (FRPs) reviewed and approved
 by the Region.

 Definition of Accomplishment:
 The initial evaluation, detailed review, site inspection, and approval of one response plan will each be counted separately
 (Action Name = Facility Response Plan Review).

 Initial Evaluation:  Date of the first piece of correspondence from EPA to  the facility that includes an  initial
 determination of whether the plan is complete and identification of "significant and substantial harm" facilities.  Regions
 will receive credit for an initial evaluation only once for each plan received.

 Detailed Review:  Date of the first piece of correspondence from EPA to the facility after completion of a review
 checklist or  equivalent level of review. Regions  will receive credit for detailed review of each plan once for each
 approval cycle or each material change and subsequent resubmission.

 FRP Site Inspections: Date of each site visit made as part of a FRP review, as recorded in site files or inspection report.
 Regions will receive credit for each separate site visit as part of a FRP review.               '

 Final Approval: Date of the letter from EPA to the facility approving the response plan. Regions will receive credit
 for each new approval during each review cycle.

 Changes in Definition  FY 98 - FY 99/00:
 None.

 Special Planning/Reporting Requirements:
 See Definition of Accomplishment.  The number of response plans evaluated, reviewed, and approved are reported
 non-site specifically in CERCLIS.


AREA CONTINGENCY PLANS

Definition:
Under the OPA, Regions are required to work  with Area Committees (ACs) and develop Area Contingency Plans
(ACPs). Regions vary as to whether they will publish a single plan with several sub-area annexes, or several separate
ACPs.  A Region that publishes  one ACP with four sub-area annexes will receive  the same credit as a Region that
publishes four separate ACPs.

Definition of Accomplishment:
Regions will receive credit for each publication of a contingency plan for an area or sub-area within that Region.
Publication consists of submission to the National Technical Information Service (NTIS) for public distribution, or an
equivalent level of finalization for distribution (Action Name = Area Contingency Plans).
                                                 F-13                                      My 1, 1998

-------
OSWER Directive 9200.3-14-1E

Changes in Definition FY 98 - FY 99/00:
None.

Special Planning/Reporting Requirements:
See Definition of Accomplishment. The number of ACP publications are reported non-site specifically in CERCLIS.


PREPAREDNESS FOR RESPONSE EXERCISE PROGRAM (PREP) AREA DRILLS


Definition:
OPA requires periodic drills and exercises of ACPs and FRPs. To satisfy this requirement, EPA in conjunction with
other Federal agencies helped establish PREP Area Drills, a key part of the PREP program, bring together one or more
industry groups (e.g., facilities, vessels) and usually several Federal and State agencies on complex drill scenarios. Each
year, six inland (one EPA-lead) and fourteen coastal area drills will be scheduled.

Definition of Accomplishment:
Two actions are counted separately for PREP Area Drills (Action Name = PREP Area Drills):

•   EPA-lead PREP Area Drills, which will typically be one per year nationally; and

•   Participation in non-EPA lead PREP Area Drills, which can include industry-lead drills or drills led by other Federal
    agencies. Region receives credit the date a letter, form, or memo documenting that the Region has participated in
    the drill. EPA's role will likely include some level of participation during drill preparation as well as participation
    during the actual drill.

Changes in Definition FY 98 - FY 99/00:
None.

Special Planning/Reporting Requirements:
See Definition of Accomplishment. The number of PREP Area Drills are reported non-site specifically in CERCLIS.


RESPONSE MEASURES:

OIL SPILL NOTIFICATIONS

Definition:
An oil spill notification is defined as a report to EPA of an oil discharge into the environment. This measure includes
the number of sites or incidents where an oil spill notification is received.
                                                                        i
Definition of Accomplishment:
A release notification is counted when a report of an oil spill is received, processed, and logged by EPA through ERNS
(Action Name = Oil Spill Notification).

Changes in Definition 98 - FY 99/00:
None.
 July 1, 1998                                    F-14

-------
                                                                       OSWER Directive 9200.3-14-1E

 Special Planning/Reporting Requirements:
 See Definition of Accomplishment. The number of oil spill notifications is reported non-site specifically in CERCLIS.


 OIL SPILL INVESTIGATIONS/PRELIMINARY ASSESSMENTS

 Definition:
 An Oil Spill Investigation is the process of collecting field data on an actual or potential oil release for the purpose of
 characterizing the magnitude and severity of the hazard. This Preliminary Assessment is typically related to "mystery
 spills." It is geared towards determining the source of such spills and potential impacts prior to actually taking a response
 action (if one is needed).

 Definition of Accomplishment:
 Regions will receive credit for the site visit to investigate and conduct a Preliminary Assessment of a spill or potential
 spill. Oil Spill Investigations/Preliminary Assessments (Action Name = Oil Spill Investigations) are documented by a
 letter, form, or memo to the file recording the site visit.

 Changes in Definition FY 98 - FY 99/00:
 None.

 Special Planning/Reporting Requirements:
 See Definition of Accomplishment. The number of oil spill investigations is reported non-site specifically in CERCLIS.


 OIL SPILL CLEANUPS

 Definition:
 This measure is  defined as an oil spill cleaned up by EPA using OPA response funds. A single incident should be
 counted only once regardless of how many times an EPA OSC goes back on-scene or how many phases the response
 entails.

 Definition of Accomplishment:
 For this measure, oil spill cleanup starts and completions will serve as two separate counts.

 Oil Spill Cleanup Start Date:  Date the contract modification, delivery order, or Pollution Reimbursement Funding
 Authorization for an oil spill cleanup at a site is signed (Action Name = Oil Spill Cleanup Starts).

 Oil Spill Cleanup Completion Date: Date the final Pollution Report (POLREP) is issued (Action Name = Oil Spill
 Cleanup Completions).

 Changes in Definition FY 98 - FY 99/00:
None.

Special Planning/Reporting Requirements:
See Definition of Accomplishment.  The number of oil spill cleanups started and completed are reported  non-site
specifically in CERCLIS.
                                              F-15                                     My 1, 1998

-------
OSWER Directive 92QQ.3-14-1E

OIL SPILL MONITORING/DIRECTING

Definition:
EPA may use OP A and CWA §311 authority to provide oversight and technical assistance to PRPs or other Federal,
State, or local agency responses to oil spills.

Definition of Accomplishment:
The issuance of the first POLREP at a spill where the PRPs or other Federal, State, or local agencies are performing a
response  will be considered the  start of a monitoring/directing  action activity  (Action Name = Oil Spill
Monitoring/Directing).

Changes in Definition FY 98 - FY 99/00:
Clarification added to definition of parties to which EPA may provide oversight/technical assistance.

Special Planning/Reporting  Requirements:
See Definition of Accomplishment. The number of spills where EPA is providing oversight and technical assistance is
reported non-site specifically in CERCLIS.


COST DOCUMENTATION

Definition:
In conducting responses to oil spills, the Agency can access the Oil Spill Liability Trust Fund's (OSLTF) emergency
response allocation, which is managed by the U.S. Coast.Guard (USCG).  Based on EPA's agreements with USCG, the
Agency must submit cost documentation packages within a reasonable amount of time after the completion of the oil spill
response, and sometimes interim reports based on the duration of the response and the ends of fiscal years. This measure
counts two actions: how many times the Region accessed the OSLTF [based on federal project numbers (FPNs) issued];
and how many cost documentation packages  the Region prepared  and submitted to the Cincinnati financial office.
Although the account numbers established and cost documentation packages may not match the FPNs issued one-for-one,
this measure will provide a good indicator of progress toward submitting the required documentation.

Definition of Accomplishment:
For this measure, two actions are counted:
                                                                            j
•   Number of FPNs issued to the Region (date FPN issued) (Action Name = Federal Project Number Issued ); and
                                                1                     '       I  '
•   Number of cost documentation packages the Region prepared and submitted to the Cincinnati financial office (date
    package submitted) (Action Name = of Cost Docm Pkge Issued).

Changes in Definition FY 98 - FY 99/00:
None.

Special Planning/Reporting Requirements:
See Definition of Accomplishment. The number of FPNs issued and cost documentation packages submitted are reported
non-site specifically in CERCLIS.
 July 1, 1998                                     F-16

-------
                                                                  OSWER Directive 9200.3-14-1E

 ENFORCEMENT MEASURES:


 ADMINISTRATIVE PENALTY ENFORCEMENT ACTIONS FOR SPILL VIOLATIONS
 AND PREVENTION REGULATION VIOLATIONS

 Definition:
 Administrative enforcement actions are taken by the Region as a result of violations of Section 31 l(b)(3) and 31 l(j) of
 the Clean Water Act.


 Definition of Accomplishment:
 Date that the complaint is filed in the administrative docket (Action Name = Administrative Penalty Enforcement Actions
 for Spill Violations and Prevention Regulation Violations).


 Changes in Definition FY 98 - FY 99/00:
 None.


 Special  Planning/Reporting Requirements:
 See Definition of Accomplishment.  The number of complaints filed is reported non-site specifically in CERCLIS.



 JUDICIAL PENALTY ENFORCEMENT ACTIONS FOR SPILL VIOLATIONS AND
 PREVENTION REGULATION VIOLATIONS


 Definition:
 Judicial enforcement cases are initiated by the Regions in response to violations of Section 311 (b)(3) and 3 1 1 (j) of the
 Clean Water Act.


 Definition of Accomplishment:
 Date of the letter or memo referring the case to the Department of Justice (DOJ) (Action Name = Judicial Penalty
 Enforcement Actions for Spill Violations and Prevention Regulation Violations).

 Changes in Definition FY 98 - FY 99/00:
 None.


 Special Planning/Reporting Requirements:
 See Definition of Accomplishment.  The number of judicial referrals is reported non-site specifically in CERCLIS.



 ORDERS FOR REMOVAL ISSUED  TO A RESPONSIBLE PARTY

 Definition:
 This measure counts the number of Administrative Orders (AO) for removal issued to a party under Section 31 1 of the
 Clean Water Act.


Definition of Accomplishment:
An order is counted on the date it is signed by the appropriate Regional official (Action Name = Orders for Removals
Issued to a Responsible Party).
                                                                                 July 1, 1998

-------
OSWER Directive 9200.3-14-1E

Changes in Definition FY 98 - FY 99/00:
None.

Special Planning/Reporting Requirements:
See Definition of Accomplishment. The number of orders issued is reported non-site specifically in CERCLIS.
 July 1, 1998
                                             F-18

-------
                                         OSWER Directive 9200.3-14-1E
Superfund/Oil Program Implementation Manual FY 99/00

  Appendix G: Superfund Reforms Measures of Success
                 (OERR and OSRE)
                                                    July 1, 1998

-------
OSWER Directive 9200.3-14-lE
                                        This Page Intentionally
                                              Left Blank
 July 1,1998

-------
                                                    OSWER Directive 9200.3-14-IE
                              Appendix G
        Super-fund Reforms Measures of Success (OERR and OSRE)

                            Table of Contents
SUPERFUND REFORMS MEASURES OF SUCCESS (OERR & OSRE)	 G-1
                                                                July 1, 1998

-------
OSWER Directive 9200.3-14-lE
                                        This Page Intentionally
                                              Left Blank
 July 1, 1998

-------
                                                                          OSWER Directive 9200.3-14-1E

                                            APPENDIX G
           SUPERFUND REFORMS MEASURES OF SUCCESS (OERR & OSRE)


The following measures of success have been identified for FY 99/00 to evaluate the impact that Superfund reforms have
had on the program.  For more information on this topic, please see Superfund Reforms and Current Program Priorities
in Chapter I, and the Superfund Reforms and Measures of Success section in Appendix C, Enforcement.

1.      Number of proposed cleanup decisions reviewed by the National Remedy Review Board and the estimated
        impact of reviews.

2.      Number of existing records of decision for site cleanups updated based on (1) the latest in scientific information
        and technological advancements, or (2) non-scientific changes and the estimated dollar savings as a result of
        reviews.

3.      Of the new KUFS starts this year, the number (and percentage) where the community was substantively involved
        in the design of the risk assessment or where the risk assessment was conducted by PRPs.

4.      Of the new RI/FS starts this year, the number (and percentage) of risk assessments performed using the generic
        risk assessment statement of work and the number utilizing standard risk data reporting tables.

5.      Number of sites considered as low priority for listing on the NPL or NFRAP because cleanup activities were
        considered  in setting priorities; the number of partial site deletions (Federal facility and other NPL sites)
        initiated by EPA to return property to productive uses return, and the economic and other impacts on the
        community.

6.      Number of Federal Facility Agreements revised to reflect changes in priority  activities within DoD and DOE
        facilities (i.e., number of agreements and number of milestones revised).

7.      Number of non-Federal facility, NPL sites ranked (prioritized and funded) under the Superfund Risk-Based
        Priority Setting System.

8.      Number of  negotiations where EPA offered to compensate a portion of the orphan share  and the total dollar
        amount offered; and number of settlements where EPA compensated for a portion of the orphan share and the
        total dollar amount compensated.

9.      Number of settlements establishing interest-bearing special accounts for future site costs  and the total dollar
        amount set aside in such accounts.

10.     For each section 106 UAO issued, the number of parties identified at the site,  the number  of parties excluded
        and documentation of the reasons for exclusion.

11.     Number of settlements with de micromis parties and number of de  micromis parties  entering into such
        settlements.

12.     Number of Prospective Purchaser Agreements (PPAs) issued.

13.     Number of sites where EPA discussed  its previous and planned  oversight  activities  with capable  and
        cooperative PRPs, sent a letter to the PRPs describing efforts to control/reduce oversight, and issued an
        oversight bill as appropriate.
                                                                                            July 1, 1998

-------
OSWER Directive 9200.3-14-1E

14.     Number of NPL sites where the community was involved in the remedy selection process, beyond commenting
        on the record of decision.  Number of NPL and non-NPL sites where the State (or Tribe) has the lead role in
        the responses, including selection of the cleanup remedy, consistent with CERCLA and the NCP.

15.     Number of major cases completed by the Regional Superfund Ombudsman.
July 1, 1998
G-2

-------
                                            OSWER Directive 9200.3-14-1E
   Superfund/Oil Program Implementation Manual FY 99/00




Appendix H: Government Performance and Results Act (GPRA)
                                                        July 1, 1998

-------
OSWER Directive 9200.3-14-lE
                                        This Page Intentionally
                                              Left Blank
July 1, 1998

-------
                                                                      OSWER Directive 9200.3-14-1E

                                          Appendix H
                      Government Performance and Results Act (GPRA)

                                       Table of Contents

GOVERNMENT PERFORMANCE AND RESULTS ACT (GPRA) OF 1993	  H-1
        Strategic Plan Requirements  	  H-2
               Comprehensive Mission Statement	  H-2
               General Goals and Objectives	  H-2
               Description of How General Goals and Objectives Will Be Achieved	  H-3
               Relationship Between Goals in the Annual Performance Plan and in a Strategic Plan	  H-3
               Key Factors Affecting Achievement of General Goals and Objectives	  H-3
               Program Evaluations	  H-3
        Annual Performance Plan	 ...	  H-4
               Performance Goals	  H-4
               Resources	.'....  H-4
               Performance Indicators 	  H-4
               Verification and Validation	  H-4
        Program Performance Reports	  H-4

EPA'S MISSION STATEMENT	'.H-5

EPA'S GOALS  	  H-6
        Clean Air:	;	  H-6
        Clean and Safe Water	  H-6
        Safe Food	  H-6
        Preventing Pollution and Reducing Risk in Communities, Homes, Workplaces and Ecosystems	  H-6
        Better Waste Management, Restoration of Contaminated Waste Sites, and Emergency Response	  H-6
        Reduction of Global and Cross-Border Environmental Risks	  H-6
        Expansion of Americans' Right to Know About Their Environment	  H-7
        Sound Science, Improved Understanding of Environmental Risk, and Greater Innovation to Address
               Environmental Problems	  H-7
        A Credible Deterrent to Pollution and Greater Compliance with the Law	  H-7
        Effective Management	  H-7

GPRA GOALS, OBJECTIVES, SUBOBJECTIVES STRUCTURE  	  H-8

DEFINITION OF TERMS	:	 H-10
                                                                                      July 1, 1998

-------
OSWER Directive 9200.3-14-lE
                                        This Page Intentionally
                                              Left Blank
 July 1, 1998
                                                                                                         f	

-------
                                                                           OSWER Directive 9200.3-14-1E
                                             Appendix H
                       Government Performance and Results Act (GPRA)
GOVERNMENT PERFORMANCE AND RESULTS ACT (GPRA) OF 1993

"The Law... requires that we chart a course for every endeavor...see how well we are progressing, tell the public
how we are doing, stop the things that don't work, and never stop improving..."
                                   President William Clinton, 3 AUG 93

    Superfund's program planning and reporting requirements have evolved and matured from intricate, internally
focused measures, to aligning and measuring resources with activities and reporting the environmental outcomes of the
work undertaken at hazardous waste sites. The National Goals Project of 2005 and the Chief Financial Officer's (CFO)
Act are legislative and administrative initiatives that have guided the evolution of Superfund program management by
gradually shifting the focus from  administrative  program success  to a results-oriented  future  (e.g., Superfund
Environmental Indicators) in which the program is held accountable for its actions. These various initiatives will be the
starting point for finalizing the Congressionally-mandated  GPRA, which provides the  overarching principles for
Superfund program  management now and in future years. For additional information regarding GPRA, please see
Appendix G: Superfund Reforms Measures of Success.

    In 1993, Congress enacted the Government Performance and Results Act of 1993 (Public Law 103-62) based on
its findings that:

    •       Waste  and  inefficiency in Federal programs undermine the confidence of the American people in the
            government and reduces the Federal government's ability to adequately address  vital public needs;

    •       Federal managers  are seriously disadvantaged in their efforts to improve program efficiency and
            effectiveness because of insufficient articulation of program goals and inadequate information on program
            performance; and

    •       Congressional policy making, spending decisions, and program oversight are seriously handicapped by
            insufficient attention to program performance and results.1

    The purposes of the Act are to:

    •       Improve  the  confidence of the  American people in the capability of the Federal  government, by
            systematically holding  Federal agencies accountable for achieving program results;

    •       Initiate program performance reform with a series of pilot projects in setting program goals, measuring
            program performance against those goals, and reporting publicly on their progress;

    •       Improve Federal program effectiveness and public accountability by promoting a new focus on results,
            service, quality, and customer satisfaction;

    •       Help Federal managers improve service delivery, by requiring that they plan for meeting program
            objectives and by providing them with information about program results and service quality;
                Public Law 103-62, section 2(a)

                                                  H-l                                        July 1, 1998

-------
OSWER Directive 9200.3-14-IE

    •       Improve Congressional decision making by providing more objective information on achieving statutory
            objectives, and on the relative effectiveness and efficiency of Federal programs and spending; and

    •       Improve internal management of the Federal government.2

    To carry out the provisions of GPRA, agencies are required to generate strategic plans, annual performance plans,
and program performance reports.

Strategic Plan Requirements

    Agencies  were required to submit their strategic plan no later than September 1997.  The strategic plan must be
updated once every three years or when there are significant policy, programmatic, or other changes to any element of
the current plan.  Minor changes to the strategic plan can be incorporated in advance of the three-year cycle by including
the changes in the annual performance plan.3

    The strategic plan covers a period of six years — the current fiscal year (FY) and the five fiscal years following the
current fiscal year. For example, if the strategic plan is submitted for FY 1998, the plan would cover the fiscal years
1998 through 2003.4  The elements of the strategic plan required by GPRA are as follows:
                                                                                    ;

    Comprehensive Mission Statement

    The mission statement is a brief statement which defines the basic purpose of the agency. It focuses on the core
    programs and activities, including a brief discussion of the enabling or authorizing legislation and issues Congress
    specifically charged the agency to address.5

    General Goals and Objectives

    The strategic plan documents the long-term programmatic, policy, and management goals of the agency, including
    the planned accomplishments and the schedule for their implementation. The general goals and objectives elaborate
    how the agency is carrying out its mission. Often this will be in the form of outcome-type goals.6'7
        2       Public Law 103-62, section 2(b)

        3       OMB Circular A-l 1  (revised 1995), part 2, section 200.4

        4       OMB Circular A-l 1  (revised 1995), part 2, section 200.5

        5       OMB Circular A-l 1  (revised 1995), part 2, section 200.8

                An outcome goal is defined as a description of the intended result, effect, or consequence that
                occur from carry out a program or activity.
                                                      1
        7       OMB Circular A-l 1, (revised 1995), part 2, section 200.9

July 1, 1998                                         H-2

-------
                                                                          OSWER Directive 9200.3- 14- IE
The criteria for the general goals and objectives are as follows: (a) the goals/objectives need to be precise in order
to direct and guide the staff to fulfill the mission of the agency; (b) the goals/objectives should be within the
agency's span of influence; and © the goals/objectives should be defined in a manner that allows future assessment
to be made on whether the goals/objectives were or are being achieved.8

Description of How General Goals and Objectives Will Be Achieved

This section describes the means the agency will use to meet the general goals and objectives. This includes, when
applicable: (a) operational processes; (b) skills and technologies; and (c) human, capital, information and other
resources.9

Relationship Between Goals in the Annual Performance Plan and in a Strategic Plan

The strategic plan should briefly outline: (a) the type, nature, and scope of performance goals to be included in a
performance plan; (b) the relationship between the performance goals and the general goals and objectives; and (c)
the relevance and use of performance goals  in helping determine the achievement of general goals and objectives.10

Key Factors Affecting Achievement of General Goals and Objectives

The strategic plan identifies key external factors" that are beyond the Agency's control that could significantly affect
the achievement of the general goals and objectives.  The external factor needs to be linked to a goal(s) and describe
how the achievement of the goal could be affected by the factor.12

Program Evaluations

Program evaluations that were used in preparing the strategic plan should be briefly described. Also, a schedule for
future program evaluations needs to be included.13  The development of the strategic plan is considered to be an
inherently governmental function; therefore, it can only be performed by Federal employees.14
             OMB Circular A-11, (revised 1995), part 2, section 200.9

    9        OMB Circular A-11, (revised 1995), part 2, section 200.10

    10       OMB Circular A-l 1, (revised 1995), part 2, section 200.11

             External factors may be economic, demographic, social or environmental and the factors may
             remain stable or change within a predicted rate or vary to an unexpected degree. Achievement of
             goals can also depend on the action of Congress, other Federal agencies, States, local governments,
             Tribes, or other non-Federal entities.

    12       OMB Circular A-11, (revised 1995), part 2, section 200.12

    13       OMB Circular A-11 (revised 1995), part 2, section 200.13
    14      Public Law 103-662, section 306(e)
                                                H-3                                         July 1, 1998

-------
OSWER Directive 9200.3-14-1E

Annual Performance Plan

    Agencies were required to submit a performance plan to Office of Management and Budget (OMB) by
September 1997. Beginning with fiscal year 1999, the performance plan must be submitted to Congress.  The plan must
be submitted annually thereafter, and it must be consistent with the agency's strategic plan.15  The performance plan
includes the following:

    Performance Goals

    Objective, quantifiable, and measurable performance goals  should  be established that define the level  of
    performance to be achieved by a program activity. If it is not feasible to express the  goals in an objective,
    quantifiable, and measurable form, then OMB may authorize an alternate  form.

    Resources

    A brief description of the operational processes, skills and technology, and the human, capital, information, or other
    resources required to meet performance goals.

    Performance Indicators

    Performance indicators to assess the relevant outputs, service levels, and outcomes of each activity.

    Verification and Validation

    A basis for comparing actual program results with the established performance goals, and a description of the
    methodology to be used to verify and validate measured values.16

    The development of the annual performance plan is considered to be an inherently governmental function; therefore,
    it can only be performed by Federal employees.17

Program Performance Reports

    Agencies are required to submit the program performance report to the President and Congress no later than
March 31,2000.l8  The performance report includes:

    •   The performance indicators in the agency performance plan with a comparison of the program performance
        achieved against the performance goal(s) that were set;

    •   A review of the success in achieving the performance goals;
        15      Public Law 103-62, section 4(a)(29)

        16      Public Law 103-62, section 1115(a)

        17      Public Law 103-662, section 1115(e)

        18      Public Law 103-62, section 1116(a)

July 1, 1998                                        H-4

-------
                                                                            OSWER Directive 9200.3-14-IE

    •   An assessment of the performance plan for the current fiscal year relative to the performance achieved in the
        preceding fiscal year;

    •   An explanation and description where a performance goal was not met, of: (a) why the goal was not met; (b)
        plans and schedules for achieving the performance goal; or (c) recommended action if the performance goal
        is impractical or infeasible (e.g., current or future funding is inadequate, an unforeseen occurrence impedes
        achievement);

    •   A description of the use and effectiveness of a managerial flexibility waiver in achieving the performance goal.

            An indication  of any individual or organizational consequences resulting from a failure, after using the
            waiver, to maintain the previous level of performance.                   ,

            A brief explanation of the reasons for suspending or ending prematurely any waiver that was in effect for
            the fiscal year;

    •   The summary of the program evaluations completed during the fiscal year;

    •   Performance trend data for the three preceding fiscal years. These data will phase into the report (e.g., for FY
        2000, FY 1999 data; for FY 2001, FY 1999 - FY 2000 data; for FY 2002, FY 1999 - 2001 data; for FY 2003,
        FY 2000 - 2002 data); and

    •   An acknowledgment of the role, and a description of the contributions made by non-Federal entities in the
        preparation of the report.19                                    '

    Agencies may elect to report on program performance under GPRA using the annual financial statement required
by the Chief Financial Officer's Act, but the report must be submitted by March 31 of the year following the FY covered
by the report.20 The development of the program performance report is considered to be an inherently governmental
function; therefore, it can only be performed  by Federal employees.21
EPA'S MISSION STATEMENT

    The mission of the U. S. Environmental Protection Agency is to protect human health and to safeguard the
    natural environment—air, water, and land—upon which life depends.

    EPA's purpose is to ensure that:
                                                                               f
    •   All Americans are protected from significant risks to human health and the environment where they live, learn,
        and work.

    •   National efforts to reduce environmental risk are based on the best available scientific information.
        19      Public Law 103-62, section 1116(d)

        20      Public Law 103-62, section 1116(e)

        21      Public Law 103-662, section  1116(f)
                                                  H-5                                        July 1, 1998

-------
OSWER Directive 9200.3-14-IE

    •   Federal laws protecting human health and the environment are enforced fairly and effectively.

    •   Environmental protection is an integral consideration in U. S. policies concerning natural resources, human
        health, economic growth, energy, transportation, agriculture, industry, and international trade, and these factors
        are similarly considered in establishing environmental policy.

    •   All  parts  of  society—communities,   individuals,   business,  state  and   local  governments,  tribal
        governments—have access to accurate information sufficient to effectively participate in managing human
        health and environmental risks.

    *   Environmental protection contributes to making our communities and ecosystems diverse, sustainable and
        economically productive.

    •   The U. S. plays a leadership role in working with other nations to protect the global environment.
                                                                        • '        !   I


EPA'S GOALS

1. Clean Air:
The air in every American community will be safe and healthy to breathe. In particular, children, the
elderly, and people with respiratory ailments will be protected from health risks of breathing polluted air.
Reducing air pollution will also protect the environment, resulting in many benefits, such as restoring
life in damaged ecosystems and reducing health risks to those whose subsistence depends directly on those
ecosystems.

2. Clean and Safe Water:
All Americans will have drinking water that is clean and safe to drink. Effective protection of America's
rivers, lakes, wetlands, aquifers, and coastal and ocean waters will sustain fish, plants, and wildlife, as
well as recreational, subsistence, and economic activities. Watersheds and their aquatic ecosystems will be restored and
protected to improve public health, enhance water quality, reduce flooding, and provide habitat for wildlife.

3. Safe Food:
The foods Americans eat will be free from unsafe pesticide residues. Children especially will be protected from the health
threats posed by pesticide residues, because they are among the most vulnerable groups in our society.

4. Preventing Pollution and Reducing Risk in Communities, Homes, Workplaces and Ecosystems:
Pollution prevention and risk management strategies aimed at cost-effectively eliminating, reducing, or
minimizing emissions and contamination will result in cleaner and safer environments in which all Americans can reside,
work and enjoy life. EPA will safeguard ecosystems and promote the health of
natural communities that are integral to the quality of life in this nation.

5. Better Waste Management, Restoration of Contaminated Waste Sites, and Emergency Response:
America's wastes will be stored, treated, and disposed of in ways that prevent harm to people and to the natural
environment. EPA will work to clean up previously polluted sites, restoring them to uses appropriate for surrounding
communities, and respond to and prevent waste-related or industrial accidents.

6. Reduction of Global and Cross-Border Environmental Risks:
The United States will  lead other nations in successful, multilateral efforts to reduce significant risks to human health
and ecosystems from climate change, stratospheric ozone depletion, and other hazards of
international concern.


July 1, 1998                                         H-6

-------
                                                                          OSWER Directive 9200.3-14-1E

7. Expansion of Americans' Right to Know About Their Environment:
Easy access to a wealth of information about the state of their local environment will expand citizen involvement and
give people tools to protect their families and their communities as they see fit. Increased information exchange between
scientists, public health officials, businesses, citizens, and all levels of government will foster greater knowledge about
the environment and what can be done to protect it.

8. Sound Science, Improved Understanding of Environmental  Risk, and Greater Innovation to Address
Environmental Problems:
EPA will develop and apply the best available science for addressing current and future environmental hazards, as well
as new approaches toward improving environmental protection.

9. A Credible Deterrent to Pollution and Greater Compliance with the Law:
EPA will ensure full compliance with laws intended to protect human health and the environment.

10. Effective Management:
EPA will establish a management infrastructure that will set and implement the highest quality standards for effective
internal management and fiscal responsibility.
                                                 H-7                                       July 1, 1998

-------
OSWER Directive 9200.3-14-IE

GPRA GOALS, OBJECTIVES, SUBOBJECTIVES STRUCTURE
GOAL 5: BETTER WASTE MANAGEMENT, RESTORATION OF CONTAMINATED
WASTE SITES, AND EMERGENCY RESPONSE

America's wastes will be stored, treated, and disposed of in ways that prevent harm to people and to the natural
environment. EPA will work to clean up previously polluted sites, restoring them to uses appropriate for surrounding
communities, and respond to and prevent waste-related or industrial accidents.	
 OBJECTIVE 1: Reducing or Controlling Risks to
 Human Health and the Environment - By 2005, EPA
 and its partners will reduce or control the risks to
 human health and the environment at over 375,000
 contaminated Superfund, RCRA, UST and brownfields
 sites.
       OBJECTIVE 2: Prevent Releases by Proper Facility
       Management and Respond to Emergencies — By 2005,
       282,000 facilities will be managed according to
       practices to prevent releases to the environment, and
       EPA and its partners  will have the capabilities to
       successfully respond  to all known emergencies to
       reduce the risks to human health and the environment.
 Superfund, Federal Facilities and Brownfields
 Subobjectives
                 Oil Program Subobjective
      Respond to Superfund Hazardous Waste Sites
        Oil Pollution Prevention, Preparedness and Response
              Superfund Enforcement
              Federal Facilities lAGs
 Respond to Requests for Transfer of Federal Properties
           Address Brownfields Properties
July 1, 1998
H-8

-------
                                                                           OSWER Directive 9200.3-14-IE

SUPERFUND, BROWNFIELDS, AND OIL GPRA SUBOBJECTIVES AND PERFORMANCE
MEASURES
 Respond to Superfund Hazardous Waste Sites: By 2005, EPA and its state, tribal, and Federal partners will
 reduce the risks that Superfund sites pose to public health and the environment by: (1) completing construction at
 a total of 1,200 National Priorities List sites; (2) conducting 2,400 additional removal actions; (3) determining if
 Superfund cleanup is needed at 85% of the sites entered into the Superfund site data base (CERCLIS); (4)
 maximizing Potentially Responsible Party participation in conducting/funding response actions; (5) meeting
 statutory deadlines for Federal facility activities.  EPA will  collaborate with States and Indian Tribes to enhance
 the Federal, state, and tribal Superfund program, reduce overlap among the programs, and leverage public and
 private resources to promote cost-effective, efficient cleanups of Superfund sites.
 Superfund Enforcement—By 2005, EPA will continue to maximize the participation of potentially responsible
 parties in conducting/funding response actions at Superfund sites while promoting fairness during the enforcement
 process. Based on the urgency of the situation and/or the capabilities of the PRPs, EPA will optimize PRP
 removals. More than 70% of the long-term cleanup actions are now financed by PRPs, and EPA's goal is to
 maintain or increase that level of participation.  EPA will do this through orphan share compensation, de_ minimis
 settlements, cash-out, mixed funding, mixed work, alternative dispute resolution, ability-to-pay settlements, PRP
 oversight, and interest bearing special accounts where applicable.  At sites where EPA decides to issue Unilateral
 Administrative Orders (UAOs), EPA will issue or document non-issuance of UAOs to 100 percent of non-settling
 parties (except UAOs for time critical or emergency removal actions). In addition, EPA will address cost
 recovery at 100 percent of all NPL and non-NPL sites with total past costs equal to or greater than $200,000
 which need to be addressed prior to the expiration of the Statute of Limitations (SOL).
 Federal Facility Enforcement
  - By 2005, EPA will ensure compliance with Federal facility statutes and CERCLA agreements and ensure
 completion of current NPL CERCLA.IAGs.
 Respond to Request for Transfer of Federal Properties - By 2005, the Federal facility program will respond
 to 100 percent of all known requests to facilitate and assist with the transfer of Federal properties for use, reuse or
 redevelopment.
 Address Brownfields Properties - By 2005, EPA and its partners will facilitate the reuse of 300 Brownfields
 properties by providing technical and financial assistance to communities.
 Oil Pollution Prevention. Preparedness, and Response - By 2005, (1) 3,000 additional facilities will be in
 compliance with the spill prevention, control, and countermeasure provisions of the oil pollution prevention
 regulation and therefore better prepared to prevent oil spills; (2) 1,600 additional facilities will be adequately
 prepared to respond to oil spills as measured by the number of approved response plans prepared in compliance
 with statutory and regulatory requirements, and to the maximum extent practicable, tribal traditions and customs;
 and (3) EPA will demonstrate significant improvements in area contingency planning for oil spills. Each year, all
 significant oil spills in the inland zone will be responded to in an effective manner by the responsible party, the
 state or local spill responders, or if necessary, EPA.
                                                  H-9                                        July 1,1998

-------
OSWER Directive 9200.3-14-lE
                                        This Page Intentionally
                                              Left Blank
July 1, 1998

-------
                                            OSWER Directive 9200.3-14-E
Superfund/Oil Program Implementation Manual FY 99/00




         Appendix J: Community Involvement
                                                         July 1, 1998

-------
OSWER Directive 9200.3-14-E
                                        This Page Intentionally
                                              Left Blank
 July 1, 1998

-------
                                                                        OSWER Directive 9200.3- 14-E

                                           Appendix J
                                    Community Involvement

                                        Table of Contents

J.A FY 99/00 SCAP TARGETS AND MEASURES	:	j_!

        J.A.I   Overview of FY 99/00 Community Involvement Targets/Measures	J-1
        J.A.2   Community Involvement Plan	        j_2
        J.A.3   Information Repository  	                  j_3
        J.A.4   Public Meeting	                   [	j_3
        J.A.5   Community Advisory Groups/Restoration Advisory Boards/
               Site-Specific Advisory Boards (CAGs/RABs/SSABs) 	j_3
        J.A.6   Technical Assistance Grants (TAGs)	     j_4
        J.A.7   Technical Outreach Services for Communities (TOSC) 	j_5

J.B CIOC DATA SPONSOR RESPONSIBILITIES	 	j_5

        J.B.I   Role of CIOC as a Data Sponsor	j_5
        J.B.2   National Program Requirements and the Data Sponsor Role 	j-6

                       Program Goals and Objectives 	    j_6
                       Statutory Mandates 	,	        j_g
                       Regulatory and Policy Requirements	j.g
                       Superfund Reforms 	  j. j2
                       Government Performance and Results Act (GPRA) .	j-12
                       Reauthorization, Congressional Inquiries and Audits	jr. 13

        J.B.3   CIOC Headquarters and Regional Organization	•	         j_13
        J.B.4   Timeline	'.'.'.'.'.'.'.'.'.'.'.'.'.'.	J-14
        J.B.5   Program Monitoring and Reporting	           j. jg

                      Data Quality 	           j_jg
                      Management Reports	        j_j7
                      Coding Guidance	      j. jy
                      Modifications (Since Last Update) 	      j_17
                                                                                      July 1, 1998

-------
OSWER Directive 9200.3-14-E

                                    Appendix J
                              Community Involvement

                                   List of Exhibits

EXHIBIT J.I COMMUNITY INVOLVEMENT ACTIVITIES	

EXHIBIT J.2 COMMUNITY INVOLVEMENT REQUIREMENTS	

EXHIBIT J.3 CIOC HQ AND REGIONAL ROLES AND RESPONSIBILITIES
. J-2

. J-7

J-14
 July 1, 1998
             i'h	1,

-------
                                                                           OSWER Directive 9200.3-14-E
                                            APPENDIX J
                                 COMMUNITY INVOLVEMENT
 J.A  FY 99/00 TARGETS AND MEASURES


 J.A.1   OVERVIEW OF FY 99/00 COMMUNITY INVOLVEMENT
 TARGETS/MEASURES

 The Superfund Comprehensive Accomplishments Plan (SCAP) is used by the Assistant Administrator for the Office of
 Solid Waste and Emergency  Response (AA SWER), Assistant Administrator for the Office of Enforcement and
 Compliance Assurance (AA OECA), and senior Superfund managers to monitor progress each Region is making towards
 achieving the GPRA targets and annual performance goals. In addition, SCAP will continue to be used as a management
 tool to project and track activities that contribute to those GPRA goals and support resource allocation.  The program
 will set national goals based on historical performance and performance expectations within a limited budget for the
 performance goals  in GPRA and track accomplishments in the activities contributing to those goals.  Regions should
 continue to plan and report accomplishments in WasteLAN as they have traditionally.

 To more clearly reflect the  relationship between GPRA and the SCAP process, targets  (GPRA targets/annual
 performance goals) and measures (GPRA and program measures) are defined as follows:

        GPRA Targets/Annual Performance Goals are a subset of the overall planning and budgeting information that
        has traditionally been tracked by the Superfund program offices. They are numerical goals that are established
        nationally  prior to the start of the operating year; for example, 136 construction completions at Superfund
        National Priorities List (NPL) sites in FY 99.

        Measures are activities deemed essential to tracking overall program progress; there are no externally reported
        numerical goals or estimates associated with measures. There are two types of measures: GPRA measures and
        program measures.  GPRA measures simply track the number of actions that  occur throughout the year
        (accomplishments) and are used to  evaluate program progress; for example, the  number of agreements
        negotiated  with States and Tribes. Program measures are used to project the number of events and activities
        that each Region expects to perform during the year using anticipated resources; for example, the number of
        sites where EPA settled based on ability-to-pay determinations.

The following pages contain,  in pipeline order, the definitions of the FY 99/00 community involvement activities
Exhibit J.I displays the full list of community involvement activities defined in this Appendix. These measures are
tracked at Federal and non-Federal facility sites.
                                                                                          July 1, 1998

-------
OSWER Directive 9200.3-14-E
                                           EXHIBIT J.I
                            COMMUNITY INVOLVEMENT ACTIVITIES
ACTIVITY
Community Involvement Plan
Information Repository
Public Meeting
Community Advisory Groups/Restoration Advisory
Boards/Site-Specific Advisory Boards
Technical Assistance Grants (TAGs)
Technical Outreach Services for Communities (TOSC)
GPRA
Target/ Annual
Performance
Goal. .






MEASURE
GPRA

/

/
/

PROGRAM
/

S


S
NOTE: Accomplishments are pulled from WasteLAN on a semi-annual basis.

J.A.2  COMMUNITY INVOLVEMENT PLAN

Definition:
The National Contingency Plan (NCP) requires a Community Involvement Plan for all remedial response actions and
for all removals longer than 120 days. Community Involvement Plans document concerns identified during community
interviews and provide a detailed description of the community involvement activities planned on the basis of these
interviews. For remedial actions, the plan must be prepared before the Remedial Investigation/Feasibility Study (RI/FS)
begins. A revised plan that identifies additional activities during Remedial Design (RD) and remedial construction
should be prepared before RD begins.

Definition of Accomplishment:
Community Involvement Plan: Date the Community Involvement Plan is published/issued (e.g. date stamped on
document) by the appropriate Regional official is reported in WasteLAN as the actual completion date (Actual Complete)
of the SubAction "Community Involvement Plan."

Amended Community Involvement Plan: The date the Amended Community Involvement Plan is published/issued (e.g.,
date stamped on document) by the appropriate Regional official is reported in WasteLAN as the actual completion date
(Actual Complete) the SubAction "Rev Community Involvement Plan."

Changes in Definition FY 98 - FY 99/00:
This is a new program measure.

Special Planning/Reporting Requirements:
these SubActions are valid for the following Actions in WasteLAN: PRP Community Relations, Federal Facility
Community Relations, Remedial Community Relations, and Removal Community Relations.  Funds for Community
Involvement Plans are in the Federal facility, site characterization, removal, or enforcement AOAs. This is a program
measure.
 July 1, 1998
3-2

-------
                                                                       OSWER Directive 92003-14-E

 J.A.3  INFORMATION REPOSITORY

 Definition:
 The information repository is a project file or repository containing site information, documents on site activities, and
 general information about the Superfund program. EPA requires an information repository at all sites where remedial
 activities are being performed and any sites where a removal action is being conducted that is likely to extend beyond
 120 days.

 Definition of Accomplishment:
 The date the Information Repository is established is reported in WasteLAN as the actual completion date (Actual
 Complete) of the SubAction "Info Repository Established."

 Changes in Definition FY 98 - FY 99/00:
 This is a new GPRA measure.

 Special Planning/Reporting  Requirements:
 This is a GPRA measure. This SubAction is valid for the following Actions in WasteLAN: PRP Community Relations
 Federal Facility Community Relations, Remedial Community Relations, and Removal Community Relations.


 J.A.4 PUBLIC MEETING

 Definition:
 Public meeting is a forum to inform citizens of ongoing response activities, and to discuss and receive citizen feedback
 on the proposed course of action. The Agency must offer to hold a public meeting before adopting a plan for remedial
 action or ROD.

 Definition of Accomplishment:
 The date the public meeting is held  is reported in WasteLAN as the actual completion date (Actual Complete) of the
 SubAction "Public Meeting."

 Changes in Definition FY 98 - FY 99/00:
 This is a new program measure.

 Special Planning/Reporting Requirements:
 This is a program measure. This SubAction is  valid for the following Actions in WasteLAN: PRP Community Relations
 Federal Facility Community Relations, Remedial Community Relations, and Removal Community Relations.


 J.A.5  COMMUNITY ADVISORY GROUPS (CAGs)/RESTORATION ADVISORY
        BOARDS (RABs)/SITE-SPECIFIC ADVISORY BOARDS (SSABs)

 Definition:
 Community Advisory Groups (CAGs) are public forums for people with diverse community interests to formally present
 and discuss their needs and concerns about a site in their neighborhood.  CAGs may receive help from EPA; state, tribal
 and local governments; and universities in such areas as supporting and participating in training, and assisting with
 administrative support and meeting facilitation.


Site-Specific Advisory  Boards (SSABs) are a forum for experts and concerned stakeholders to provide advice and
recommendations on DOE's Environmental Management strategic decisions.  Restoration Advisory Boards (RABs)

                                              J-3                                    July 1, 1998

-------
OSWER Directive 9200.3- 14-E

provide a forum through which members of nearby communities can provide input to DoD's environmental restoration
program.

RABs and SSABs complement other community involvement activities, such as public meetings, mailings, and local
information repositories.

Definition of Accomplishment:
CAG Established Date:  The establishment of the Community Advisory Group is defined as the date of the tirst
meaningful (not interest finding) Community Advisory Group Meeting (Action Name Pending).

RAB/SSAB Established  Date: The establishment of the RAB/SSAB is defined as the actual complete date (Actual
Complete) of the initial RAB/SSAB information meeting.  (SubAction Name = Site-Specific Advisory Board Meeting
or SubAction Name = Restoration Advisory Board Meeting).

RAB Adjourned Date: Date the RAB is adjourned by DoD.

SSAB Terminated Date: Date the SSAB is terminated by the Secretary of Energy.

Changes in Definition FY 98 - FY 99/00:
This is a new GPRA measure.

Special Planning/Reporting Requirements:
This is a GPRA measure. The data management approach for tracking the adjournment of RABs and the termination
of SSABs is still under development. Site Specific Advisory Board Meeting and Restoration Advisory Board Meeting
are valid SubActions under Federal Facility Community Relations.

   *                                                                         !
J.A.6  TECHNICAL ASSISTANCE GRANTS (TAGs)

 Definition:                                                                            .,    ,  .  .
The Superfund Amendments and Reauthorization Act of 1986 (SARA) established the TAG program to provide technical
 assistance to eligible communities. The technical assistance allows communities to improve the decision making process
 at their sites.

 Definition of Accomplishment:
 The start of the TAG (Action Name = Community Relations TA Grants) is the signature of the award agreement to the
 community group which is the obligation of funds for the TAG.  The completion of the TAG is the date the grant is
 closed out by the Region.

 Changes in Definition FY 98 - FY 99/00:
 The completion of the TAG is the date it is closed out by the Region.

 Special Planning/Reporting Requirements:
 TAG Starts is a GPRA  measure. The Region must also enter the following information into WasteLAN:
         •   Total Dollar Amount of Grant; and
         •   Initial Dollar Amount of Grant; and
         •   Waiver Amount, if applicable; or
         •   Deviation  Amount, if applicable.
                                                                            I

 Planned start and completion dates are not required in WasteLAN. Funds may be planned site-or non-site specifically;
 however, they must be  obligated site specifically. Funds for TAGs at non-Federal facility sites are contained in the


 July 1, 1998                                     J-4

-------
                                                                          OSWER Directive 9200.3-14-E

 response budget and found in the other response ADA.  Funds for TAGs at Federal facility sites are contained in the
 Federal facility budget and found in the Federal facility AOA.



 J.A.7  TECHNICAL OUTREACH SERVICES FOR COMMUNITIES (TOSC)

 Definition:
 TOSC provides independent scientific and technical assistance to communities dealing with hazardous substance
 contammation questions. TOSC provides information and education to empower communities with an understanding
 of technical issues to more effectively participate in environmental decisions.  TOSC is a service of the University-based
 Hazardous Substance Research Centers (HSRCs) which are, in part, supported by grants from EPA.

 Definition of Accomplishment:
 The date of the commitment between the  community and the HSRCs is reported in WasteLAN as the actual start date
 (Actual Start) of the TOSC (Action Name = Technical Outreach Services to Communities).

 Changes in Definition FY 98 - FY 99/00:
 This is a new program measure.

 Special Planning/Reporting Requirements:
 The Region must indicate on the Community Organizations Information screen that the organization is a TOSC recipient
 This is a program measure.


 J.B  CIOCDATA SPONSOR RESPONSIBILITIES

 J.B.1  ROLE OF CIOC AS A DATA SPONSOR

 This document clarifies the relationship  among data sponsors and data owners. Under the direction of the Community
 Involvement and Outreach Center (CIOC), this document presents Superfund data and reporting requirements needed
 to accomplish the following goals:

        •   Enhance discussion among data sponsors and data owners;
        •   Improve data quality; and
        •   Update Superfund reporting  requirements by fully employing the information in WasteLAN to meet all
            statutory and management reporting requirements (e.g., GPRA, CFO  Act, CERCLA) on a real-time basis.

 In the past, Headquarters has pulled CERCLIS data on the fifth working day of each month to support national reporting
 and significant calendar events. During FY 97, WasteLAN was implemented nationally and is the official data source
 for all national reporting. The transition to WasteLAN enables EPA to conduct real-time reporting which requires data
 to be current, complete,  and consistent.  Real-time reporting supports ad hoc requests, as well as statutory and
 management reporting requirements.

 Community Involvement data are to be made  available to Headquarters to support the purpose and to assist the data
sponsor in meeting the program objectives.  Significant calendar events for Community Involvement are included to
identify what is current (i.e., reporting, special initiatives, etc.), complete (i.e., planned project schedules), and consistent
with programmatic drivers.
                                                J-5                                      July 1, 1998

-------
OSWER Directive 9200.3-14-E

J.B 2  NATIONAL PROGRAM REQUIREMENTS AND THE DATA SPONSOR ROLE

The following statutory,  policy and  management requirements establish the mandate for meeting the program
requirements described in the rest of this Appendix. A description of program goals and objectives, statutory mandates,
regulatory and policy requirements, as well as subsequent program reforms and redirection in measuring program results
are included in this section.

Program Goals and Objectives

The goal of Superfund's community involvement program is to encourage communications with affected citizens and
participation in decision-making. Community involvement is not a phase in Superfund, like a removal or remedial
cleanup action, but rather it is an integral part of the entire process that benefits both the public and EPA. The program
has three main objectives:

        •   Giving the public the opportunity to comment on and provide input into technical decisions that affect their
            lives;
        •   Informing the public of planned or,ongoing activities and  keeping them apprised of the nature of the
            environmental problem, the threats it  may pose, the responses under consideration, and the progress that
            is being made; and
        •   Focusing and resolving conflict (conflict may be unavoidable in some circumstances, but it can  be
            constructive if it brings into the open alternative viewpoints).

Statutory Mandates

Sections 113, 117 and  122 of CERCLA, as amended by the Superfund Amendments and Reauthorization Act (SARA),
established eight principle requirements for community involvement:

         •   Developing a locally available administrative record;
         •   Establishing a locally available information repository;
         •   Notifying the public of the release of the Remedial Investigation/Feasibility Study (RI/FS) and Proposed
            Plan, and in the case of removal actions with a planning period of at least six months, the engineering
            evaluation/cost analysis (EE/CA);
         •   Providing a public comment period on the RI/FS, Proposed Plan, and EE/CA ;
         •   Holding a public meeting on the RI/FS and Proposed Plan;
         •   Developing a meeting transcript;
         •   Providing notice and comment period on the Administrative Order on Consent or Consent Decree;
         •   Developing a responsiveness summary on comments received on the RI/FS, Proposed Plan and EE/CA.

 Regulatory and Policy Requirements

 Section 300 of the National Oil and Hazardous  Substances Pollution Contingency Plan (NCP) and subsequent policy
 directives  and guidance documents establish the  requirements for community involvement through every phase of
 Superfund's cleanup process. These requirements are presented Exhibit J.2.
 July 1, 1998
                                                    J-6

-------
                                                                           OSWER Directive 9200.3-14-E
                                              Exhibit J.2
                                 Community Involvement Requirements
 Site Activity
j| Requi
irement(s)
[ Citation (Source)
 Designate an
 Agency
 Spokesperson
 (Community
 Involvement
 Coordinator)
 Administrative
 Record
                             ? '.MFor All Removal Actions
  The Agency must designate a spokesperson to
  inform the public about the release and actions
  taken, to respond to questions, and to notify
  immediately affected citizens, State and local
  officials and, when appropriate, civil defense or
  emergency management agencies.
  The Agency must establish an administrative record
  and make the administrative record available to the
  public at a central location at or near the site, if
  applicable.
                                            NCP, Section 300.415(m)(l)
                                            SARA Section 113(k); NCP
                                            Section 300.820
                       FOJT Removal Actions with Planning Period of
                         \-*,"/  JCess Than 6 months  •-,  $"-J*"*'
 Notice and
 Availability of
 Administrative
 Record
Public Comment
Period
Response to
Significant
Comments
  Within 60 days of the start of on-site removal
  activity, the lead Agency must make the
  administrative record available to the public and
  issue a notice of availability in a major local
  newspaper of general circulation.
  The Agency must provide a public comments
  period, if appropriate, of not less than 30 days from
  the time the administrative record is made available
  for public inspection.
  The Agency must prepare a written response to
  significant comments.
                                           NCP Sections
                                           300.415(m)(2)(I) and
                                           300.820(b)(l)
                                           NCP Section 300.415(m)(2)(ii)
                                           NCP Section
                                           300.415(m)(2)(iii)
  ommunity
Interviews
Community
delations Plan
(CRP)
                         For Removal Actions Expected to Extend
                                ,   Beyond 120 Days
 By the end of the 120-day period, the Agency must
 conduct interviews with local officials, public
 interest groups, or other interested parties to
 determine their concerns and information needs,
 and to learn how citizens would like to be involved
 in the Superfund process.
 The Agency must prepare a CRP, based on
 community interviews and other relevant
 information, that specifies the community
 involvement/outreach activities the Agency plans to
 undertake during the response.  The Agency must
 complete this CRP within 120 days of the start of
 on-site removal activity.
                                           NCP Section 300.415(m)(3)(I)
                                           NCP Section 300.415(m)(3)(ii)
                                                 J-7
                                                                                           July 1, 1998

-------
OSWER Directive 9200.3- 14-E
 Site Activity
  n formation
  lepository
  istablishment and
  Notification/
  Notice of
  Availability of
  Administrative
  Record
Requirement(s)
Within 120 days of the start of on-site removal
activity, the Agency must establish at least one
information repository at or near the location of
removal actions that contains items available for
public inspection and copying. The Agency must
inform the public of the establishment of the
information repository and provide notice of the
availability of the administrative record in the
repository.
                                                                       Citation (Source)
                                                                       NCP Section 300.415(m)(3)(iii)
                         For Removal Actions with a Planning Period/
                                   of at Least Six Months   ,
  Community
  Interviews and
  Community
  Relations Plan
  (CRP)
  Information
  Repository
  Establishment and
  Notification/
  Notice of
  Availability of
  Administrative
  Record
  Notice of
  Availability/
  Description of
  EE/CA
  Public Comment
  Period
  Responsiveness
  Summary
The Agency must follow the same procedures as
outlined in the previous section, except that staff
must conduct interviews and prepare a CRP prior to
completion of the engineering evaluation/cost
analysis (EE/CA)                        	
 The Agency must follow the same procedures as
 outlined in the previous section, except that staff
 must establish the information repository and make
 the administrative record available no later than the
 signing the EE/CA approval memorandum
 The Agency must publish a notice of availability
 and a brief description of the EE/CA in a major
 local newspaper of general circulation.
 Upon completion of the EE/CA, the Agency must
 provide at least 30 days for the submission of
 written and oral comments. The Agency must
 extend this comment period at least 15 days upon
 timely request.
 The Agency must prepare a written response to
 significant comments and make this responsiveness
 summary available to the public in the information
 repository.
                                                                        NCP Section 300.415(m)(4)(I)
                                                                        NCP Section 300.415(m)(4)(I)
                                                                        NCP Section 300.415(m)(4)(ii)
                                                                        NCP Section 300.415(m)(4)(iii)
                                                                        NCP Section 300.415(m)(iv)
 July 1, 1998
                                                    J-8
                                                                                                          „'	'„  :r :',:!;:,
                                                                                                                   _

-------
                          OSWER Directive 9200.3-14-E
Site Activity || Requirement(s) || Citation (Source)
- v ^ r^^,^ii^;"fijNp«"&p&ii^ ,?'-";£ ',*v>i*' * '- ' • X-
-------
OSWER Directive 9200.3-14-E
Site Activity || Requirement(s) II Citation (Source)
Public Meeting
Meeting Transcript
Responsiveness
Summary
The Agency must provide an opportunity for a
public meeting to be held at or near the site during
the comment period.
The Agency must prepare a meeting transcript and
make it available to the public
The Agency must prepare a response to significant
comments, criticisms, and new data submitted on
the proposed plan and RI/FS, and ensure that this
response document accompanies the ROD.
SARA Sections 1 13 and 1 17(a)(2);
NCP Section 300.430(f)(3)(I)(E)
SARA Section 122(1); NCP
Section 300.430(c)(5)(I)
SARA Sections 1 13 and 1 17(b);
NCP Section 300.430(f)(3)(I)(F)
Pre-ROD Significant Changes
Discussion of
Significant Changes
Revised Proposed
Plan and Public
Comment
Upon determination that such changes could be
reasonably anticipated by the public, the Agency
must include in the ROD a discussion of significant
changes and the reasons for such changes.
Upon determination that such changes could not
have been reasonably anticipated by the public, the
Agency must issue a revised proposed plan that
includes a discussion of the significant changes and
the reasons for such changes. The Agency must
seek additional public comment on the revised
proposed plan.
NCP Section 300.430(f)(3)(ii)(A)
NCP Section 300.430(f)(3)(ii)(B)
After the ROD is Signed
ROD Availability
and Notification
Revision of the CRP
Site Activity
The Agency must make the ROD available for
public inspection and copying at or near the site
prior to the commencement of any remedial action.
Also the Agency must publish a notice of the
ROD'S availability in a major local newspaper of
general circulation. The notice must state the basis
and purpose of the selected action.
Prior to the remedial design, the Agency should
revise the CRP, if necessary, to reflect community
concern, as discovered during interviews and other
activities, that pertains to the remedial design and
construction phase.
NCP Section 300.430(f)(6)
NCP Section 300.435(c)(l)
 July 1, 1998
J-10

-------
                          OSWER Directive 9200.3- 14-E
Site Activity || Requirement(s) || Citation (Source)
Post-ROD Significant Changes
Differs significantly from remedy in terms of scope,
performance or costs: .
Notice and
Availability of
Explanation of
Significant
Differences
The Agency must publish a notice that briefly
summaries the explanation of significant differences
and the reasons for such differences in a major local
newspaper, and make the explanation of significant
differences and supporting information available to
the public in the administrative record and
information repository.
NCP Section 300.435(c)(2)(I)(A)
and(B)
Fundamentally alters the basic features of the
selected remedy with respect to scope,
performance or cost;
Notice of
Availability/Brief
Description of
Proposed ROD
Amendment
Public Comment
Period, Public
Meeting, Meeting
Transcript, and
Responsiveness
Summary
Notice and
Availability of
Amended ROD
The Agency must propose an amendment to the
ROD and issue a notice of availability and a brief
description of the proposed amendment in a major
local newspaper of general circulation.
The Agency must follow the same procedures as
that required for completion of the FS and proposed
plan.
The Agency must publish a notice of availability of
the amended ROD in a major local newspaper and
make the amended ROD and supporting
information available for public inspection and
copying in the administrative record and
information repository prior to commencement of
the remedial action affected by the amendment.
NCP Section 300.435(c)(2)(ii)(A)
NCP Section 300.435(c)(2)(ii)(B)-
(F),
NCP Section 300.435(c)(2)(ii)(G)
and (H)
Remedial Design (RD)
Fact Sheet and
Public Briefing - -
Upon completion of the final engineering design,
the Agency must issue a fact sheet and provide a
public briefing, as appropriate, prior to beginning
remedial action.
NCP Section 300.435(c)(3)
NPL Additions
Publication of
Proposed Rule and
Public Comment
Period
EPA must publish the proposed rule in the Federal
Register and seek comments through a public
comment period.
NCP Section 300.425(d)(5)(I)
J-ll
                                          July 1, 1998

-------
OSWER Directive 9200.3-14-E
Site Activity |j Requirement(s) II Citation (Source)
Publication of Final
Rule and Response
to Comments
EPA must publish the final rule in the Federal
Register and respond to significant comments and
significant new data submitted during the public
comment period.
NCP Section 300.425(d)(5)(ii)
NPL Deletions
Public Notice and
Public Comment
Period
Public Access to
Information
Response to
Significant
Comments
Availability of Final
Deletion Package
EPA is required to publish a notice of intent to
delete in the Federal Register and provide notice of
the availability of this announcement in a major
local newspaper. EPA must also provide a
comment period of at least 30 days on the proposed
deletion.
Copies of information supporting the proposed
deletion must be placed in the information
repository for public inspection and copying.
EPA must respond to each significant comment and
any significant new data submitted during the
comment period and include these responses in the
final deletion package.
The final deletion package must be placed in the
local information repository once the notice of final
deletion has been published in the Federal Register.
NCP Section 300.425(e)(4)(I) and
(ii)
NCP Section 300.425 (e)(4)(iii)
NCP Section 300.425(e)(4)(iv)
NCP Section 300.425(e)(5)
Supcrfund Reforms

Since 1993, EPA has launched three round of reforms to address criticisms raised by affected parties and to improve the
pace, cost and public participation aspects of the program. Each set of reforms consists of various initiatives and pilots
focusing on changes to the program that can be implemented within the existing statutory framework. The following are
reforms related to the Community Involvement area: Community Advisory Groups; Technical Assistant Grants (TAGs),
Community Involvement in the Enforcement Process Pilots, Pilot Remedy Selection by Selected States and Tribes, Pilot
Community Based Remedy Selection, Superfund Ombudsman in Every Region, and  Improve Communication with
Supcrfund Stakeholders.

Government Performance and Results Act (GPRA)

GPRA was enacted to gradually shift the focus of Superfund program management from administrative program success
to a results-oriented future in which the program is held accountable for its actions.  Community involvement data is used
to support GPRA Objective #1: Reducing or Controlling Risks to Human Health and the Environment.

The Community Involvement GPRA performance measures are located under: Subobjective  1.02 Respond to Superfund
Hazardous Waste Sites - By 2005, EPA and its state, tribal, and federal partners will reduce the risks that Superfund sites
pose to public health and the environment by: (1) completing construction at a total of 1,200 NPL sites; (2) conducting
2,400 additional Superfund removal actions; (3) determining if Superfund cleanup is needed at 85% of the sites entered
into the Superfund database (CERCLIS); (4) maximizing PRP participation in conducting/funding response actions; (5)
meeting statutory deadlines for Federal facility activities. EPA will collaborate with States and Indian Tribes to enhance
the Federal, state, and tribal Superfund program, reduce overlap among the programs, and  leverage public and private
resources to promote cost-effective, efficient cleanups of Superfund sites.
July 1, 1998
J-12

-------
                                                                           OSWER Directive 9200.3-14-E

Also, the Superfund Federal facilities program will meet statutorily mandated deadlines for various Superfund activities.

Listed below are the actual Community Involvement performance measures:

        •   A representative number of Superfund communities surveyed.
        •   The number of RABs/SSABs at DOD and DOE NPL sites per year.
        •   The number of RABs at non-NPL BRAC Fast Track Installations per year.
        •   The number and value of Technical Assistance Grants.
        •   The number of information repositories.
        •   The number of Community Advisory Groups.
        •   The percent (low/high) of communities with strong understanding of site risks based upon the Superfund
            communities surveyed.
        •   The percent (low/high) of citizen satisfaction with fairness and openness of the decision-making process
            based upon the Superfund communities surveyed.

Reauthorization, Congressional Inquiries and Audits

WasteLAN is the primary data source to support Reauthorization and Congressional inquiries, as well as questions from
the Inspector General (IG), and General Accounting Office (GAO). An example of inquires specific to the Community
Involvement program area is the number of Technical Assistance Grants provided.
                                           /

J.B.3   CIOC HEADQUARTERS AND REGIONAL ORGANIZATION

To meet these  national  program requirements, specific roles and responsibilities have been identified  for the
Headquarters' and Regional staff that work in the Community Involvement program area. The table below summarizes
each of these positions along with their responsibilities.
                                                J-13                                      July 1, 1998

-------
OSWER Directive 9200.3-14-E
                                             EXHIBIT J.3
                     ClOC HQ AND REGIONAL ROLES AND RESPONSreiLiTIES
"Title " 	 	
Community Involvement and
Outreach Center (CIOC) (HQ)
Director, CIOC (HQ)
CIOC Staff (HQ) and Community
Involvement Managers (CIMs)
(Regions)
CIMs, Remedial Project
Managers (RPMs) and On Site
Coordinators (OSCs) (Regions)
Community Involvement
Coordinators (CICs) (Regions)
Information Management
Coordinator (IMC) (Regions)
Budget Coordinator (Regions)
Responsibilities "
Facilitate WasteLAN staying closely aligned with the Superfund program,
including developing and updating guidance that requires submission of
these data for national reporting needs, maintaining and updating data
element definitions, and developing and implementing the process of
gathering, reviewing and entering the data into WasteLAN. '
Provide a synergy to create useful program policy and guidance to help the
Regions achieve program goals. Act as the central point of contact for the
Regions and is responsible for providing Regional coordination support.
Participate in program reviews, as well as prepare periodic reports on
Regional accomplishments, progress on problems, and respond to quick
turn-around, site specific requests for information from senior management
for Congressional requests, Regional visits or other needs. Serves as a forum
for sharing information, lessons learned and issues on community
involvement activities.
Ensure all data necessary to meet the requirements(s) are in WasteLAN to
support their Regional reporting needs and commitments to Headquarters.
As the data owner, provide current, complete, and consistent data into
WasteLAN that are necessary to met real-time reporting requirements and
review data that are provided in hard copy or electronically submitted.
Coordinate with the CICs to ensure all data necessary to support reporting
requirements are in WasteLAN on a real-time basis.
Ensure all data necessary to support the Regional budget are in WasteLAN
prior to specified calendar events.
J.B.4   TIMELINE

As EPA transitions to real-time reporting, the calendar of significant events will continue to drive specific program needs.
However, in order to support ad hoc requests, data must be current, complete, consistent, and accurate at all times, which
necessitates entry of data as they become available. Data owners have the additional responsibility of reviewing their
data as they are available electronically to ensure data quality.  Both real-time data entry and data review are to be
completed prior to Headquarters Community Involvement significant calendar events which are listed below.
 My 1, 1998
J-14

-------
                                                                   OSWER Directive 9200.3-14-E
       OCTOBER  1998 QUARTER 1 (FY 99)


 7      HQ pulls 4th Quarter FY 98 accomplishment data from WasteLAN and provides for:
       1) Special program reports; and
       2) Initial FY 98 end-of-year Program Assessment


24     HQ pulls 4th quarter FY 98 accomplishment data from WasteLAN for review of end-of-year
       accomplishments


       JANUARY 1999 QUARTER 2 (FY 99)


 8      HQ pulls 1st Quarter FY 99 accomplishments data from WasteLAN and provides for special
       program reports.                                              •


       MARCH 1999


 6      HQ pulls data from WasteLAN for 3rd quarter AOA for FY 99


       APRIL  1999 QUARTER 3 fFY 99)


 6      HQ pulls accomplishment data from WasteLAN and provides for:
       1) Special program reports; and
       2) Mid-year work planning evaluation


       JUNE 1999


 5      HQ pulls planning information from WasteLAN:
       1) for fourth quarter AOA; and
       2) to support FY 00 and FY 01 budget request

 5      HQ pulls financial data for analysis of Regional obligation/commitment rate


       JULY 1999 QUARTER 4 (FY 99)


 8      HQ pulls 3rd Quarter FY 99 accomplishments data from WasteLAN and provides for special
       program reports
                                          J-15                                     July 1, 1998

-------
OSWER Directive 92Q0.3-14-E
            JULY 1999(cont'd)

      8      HQ pulls data from WasteLAN to review and analyze:
            1) GPRA accomplishments, measures, pipeline workload, and FY 00 budget request;
            2) Past Regional accomplishments and planned durations/dollars; and
            3) Regional request for FY 00 budget reserve

            AUGUST 1999

      7      HQ pulls WasteLAN data to assist in preparation of the FY 01 budget

            SEPTEMBER 1999

      8      HQ pulls data from WasteLAN for first quarter FY 00 AOA


            OCTOBER 1999 QUARTER 1 fFY 00)

      6      HQ pulls 4th quarter FY 99 accomplishment data from WasteLAN and provides for:
            1) Special program reports; and
            2) Initial FY 99 end-of-year Program assessment

     20     HQ pulls 4th quarter FY 99 accomplishment data from WasteLAN for review of end-of-year
            accomplishments

            DECEMBER 1999

      7      HQ pulls WasteLAN data for 2nd quarter AOA
J.B.5   PROGRAM MONITORING AND REPORTING

Each reporting and associated data acquisition requirement specific to Community Involvement is discussed below. The
detail includes: data quality objectives, data needs, as well as reports and associated coding guidance.

Data Quality

One of the goals of the Community Involvement data sponsor is to ensure data quality which requires data to be correctly
entered into WasteLAN.  Although the methodology of acquiring and reviewing data may change over time, both will
contain a quality assurance (QA) process to ensure data quality.
July 1, 1998                                     J-16

-------
                                                                            OSWER Directive 9200.3-14-E

Current, complete, and consistent data in WasteLAN will meet the Community Involvement data sponsor goals and
objectives, as well as support real-time reporting. The following defines what the Community Involvement data sponsor
    views as current, complete, and consistent data:

        Current - Data need to be entered as actions occur.

        Complete - For the particular data element, all needed information is provided.

        Consistent - Data should be consistent nationally. Also,  within WasteLAN, data should be entered consistent
        with the data element definitions.  The data entered should be entered using the same standard across all
        Regions/HQ.

Management Reports

SCAP-04 (TAGs)
SCAP-15 (GPRA report)

WasteLAN provides the data necessary to support ad hoc requests as they relate to Reauthorization, GAO, and IG.

Coding Guidance

The coding guidance for SCAP measures will be reflected in the FY 99/00 Coding Guide.

Modifications (since last update)

Send all proposed changes to the appropriate data sponsor for review and approval and copy the Regional IMC. After
the review of the proposed changes is completed, the data sponsor will send the changes to Robert White for review by
Headquarters and Regional principals including Subject Matter Experts, Data Sponsors, and Senior Process Managers,
if applicable. The preferred method is to mark-up a photo-copy of text you seek to change. The SPIM is a numbered
EPA publication  in loose leaf 3-ring binder format so that changes can be incorporated accordingly.     ;'
                                                  J-17                                       July 1, 1998

-------
OSWER Directive 9200.3-14-E
                                         This Page Intentionally
                                                Left Blank
July 1, 1998                                        J-18      &u.s. GOVERNMENT PRINTING OFHCE.-1998-621-983/93354

-------