United States
                   Environmental Protection
                   Agency
Office of Solid Waste
and Emergency Response
(5104)
EPA 550-B99-001
February 1999
www.epa.gov/ceppo/
                   RMP*SUBMIT™
                   USER'S  MANUAL
                   for RMP*Submit Version 1.07, issued January 4, 1999
Chemical Emergency Preparedness and Prevention Office
                      Printed on recycled paper

-------

-------
                         RMP*Submit™  User  Manual

1.     RMP*SUBMIT TECHNICAL HELP  	  Ch. 1 Pg. 2

2.     DATA ELEMENT INSTRUCTIONS	  Ch. 2 Pg. 3

3.     GETTING READY TO SUBMIT	  Ch. 3 Pg.
             A. TO HELP ANSWER YOUR QUESTIONS	  Ch. 3 Pg.
             B. WHEN is MY RMP DUE?  	  Ch. 3 Pg.
             C. CAN I SUBMIT MY RMP BEFORE THE JUNE 21, 1999, DEADLINE? 	  Ch. 3 Pg.
             D. ELECTRONIC WAIVER-FORM AND INSTRUCTIONS	  Ch. 3 Pg.
             E. SUBMITTING A "COMPLETE" RMP	  Ch. 3 Pg.
             F. CERTIFICATION	  Ch. 3 Pg. 3
             G. HOW TO LABEL YOUR SUBMISSION DISKETTE	  Ch. 3 Pg. 4
             H. HOW TO ASSEMBLE YOUR COMPLETE RMP SUBMISSION PACKAGE	Ch. 3 Pg. 4
             i. WHERE TO SEND COMPLETED RMP REPORTS:  	  Ch. 3 Pg. 5
             j. RECORD KEEPING 	  Ch. 3 Pg. 5
             K. PAPERWORK REDUCTION ACT NOTICE	  Ch. 3 Pg. 5
             L. Y2KPROBLEMS	  Ch. 3 Pg. 6

4.     SUBMITTING CBI & TRADE SECRETS    	  Ch. 4 Pg. 2

5.     WHAT TO EXPECT AFTER YOU SUBMIT	  Ch. 5 Pg. 1

6.     REVISIONS TO YOUR RMP	  Ch. 6 Pg. 1
             A. CORRECTIONS	  Ch. 6 Pg. 1
             B. RE-SUBMISSIONS	  Ch. 6 Pg. 2
             c. De-registration  	  Ch. 6 Pg. 3

7.     STATE-SPECIFIC INFORMATION	  Ch. 7 Pg. 1

8.     GLOSSARY OF ACRONYMS & TERMS 	  Ch. 8 Pg. 1
APPENDICES
A     RMP Form
B     Electronic Waiver Form
C     Sample Certification Letters
D     CBI Substantiation Form
E     CBI Unsanitized Data Element Form
F     How to Report your Facility Latitude and Longitude
G     State RMP Contacts
H     EPA Regional RMP Contacts
I     RMP* SUBMIT Related Materials
J     3 Digit NAICS Codes
RMP* Submit User Manual February 1999

-------
Introduction

The RMP* Submit User Manual provides assistance in preparing and submitting Risk Management Plans
(RMPs) under Section  112(r) of the Clean Air Act.  RMP* Submit software is designed to significantly
reduce errors in submission through "checks " for each data element.

The RMP*Submit User Manual includes:
Technical help on using RMP* Submit;
        -Instructions on how to complete each data element;
        -Details on how to submit your RMP; and
        -What to expect after you submit.

Also included are ten Appendices, including a copy of the RMP paper form (Appendix A) for those who
need to submit their RMP on paper.  Appendices C and D include the necessary forms  for claiming
Confidential Business Information (CBI), since these may not be submitted electronically. In addition to
this User Manual, you should refer to other RMP guidance documents, which are listed in Appendix I.

For software questions or installation problems,  contact the RMP Reporting Center at (703) 816-4434
(8am-4:30pm M-F) or via e-mail at:  userrmp.usersupport@epcra.org. For RMP compliance assistance,
call the Hotline at (800) 424-9346 or (703) 412-9810.

This is the first edition  of RMP*Submit (version 1.07), dated January 1999. We welcome your comments
and suggestions for improving RMP*Submit.  Send your comments to:

RMP* Submit Comments
Chemical Emergency Preparedness and Prevention Office (MC 5104)
U.S. Environmental Protection Agency
401M St., SW
Washington, DC 20460

Email: homepage.ceppo@epa.gov
RMP* Submit User Manual February 1999

-------
1.     RMP * SUBMIT USER HELP

A.     INTRODUCTION

This technical user manual provides instructions for using the RMP*Submit software program.
RMP*Submit is an automated tool for reporting Risk Management Plan (RMP) information.

A.I.   On-line Help

RMP*Submit Windows Help provides on-line access to the Risk Management Plan Data Element
Instructions for each field, as well as for keyboard equivalents and shortcut keys.

To get context-sensitive Help
Press   to get context-sensitive Help for the data entry field in which the cursor is located.

To display the Help Table of Contents
Choose Contents from the Help menu or in the Help window, click the Contents button. The Table of
Contents provides an overview of Help and access to all Help topics.

To search for information
The Search command enables you to quickly find Help topics about a particular subject.  To get Help for a
specific item or task, choose Search for Help on... from the Help menu, or in the Help window, click the
Search button from the Help Menu. As you type the first few letters of the subject you are interested in,
RMP*Submit scrolls through a list of subjects to locate a matching entry. Double-click your subject, or
select the subject and choose Show Topics.

To see a list of Help topics you looked up
Click  Options from the Help menu and click Display History Window. The History list shows the help
topics you have looked up in the current Help session only. Each time you open Help, it begins a new
History list.

To print a topic
Click  the Print button or select Print Topic from the File  menu in the Help Window.

To return to the previous Help topic
Click  the Back button.

To keep Help on  top
Normally the Help window displays behind the application when you click outside the window.  However,
in Windows 3.1 you can choose Always on Top from the  Help window's Options menu to keep the Help
window in view while you work. Choosing Always on Top toggles the  option on and off.  In Windows 95,
select Keep Help on Top to keep the Help window in view and Not on  Top to turn the option off.

To exit Help
Select Exit from  the File menu. Windows 95 users can press  to close the current Help window.
RMP* Submit User Manual    February 1999                                                Ch. 1 Pg. 1

-------
A.2.   Saving Your Work

Since RMP*Submit automatically saves the information you enter, there are no explicit "SAVE" buttons or
menu options. For more information on how data is saved, and how to cancel or un-do entries, see section
C.4.6.,  "Reversing Data Entry Changes."

A.3.   Document Conventions

The conventions used in this manual are as follows:

•      Computer commands are bolded (e.g., select Print).

•      Keystrokes to be typed are bolded and enclosed within less than (<) and greater than (>) symbols
       (e.g., press ).

•      Two keystrokes joined by a plus sign (+) indicates that the two keys should be pressed
       simultaneously (e.g., ).

The RMP"Submit User Manual assumes that users are familiar with basic Microsoft Windows concepts.
For additional help, see the Microsoft Windows User's Guide.


B.     GETTING STARTED

This section describes the hardware and software requirements, installation procedures, and instructions for
starting and exiting the application.

B.I.   System Requirements

The RMP*Submit software program is supplied on four 3.5-inch,  1.44-MB diskettes in compressed format
or CD-ROM.  To install and run RMP*Submit, you  will need 6 to 10 MB of available hard disk space and
a minimum of 16 MB of Random Access Memory (RAM). Listed below are the minimum computer
hardware and  software requirements for installing and running RMP*Submit.

Hardware/Software Requirements
Personal Computer: IBM-compatible with a 486 DX2 or higher  Central Processing Unit (CPU) (Pentium
is recommended).

Monitor:  Video Graphics Adapter (VGA) or compatible  displays (SVGA is recommended).

Operating Environment: Microsoft Windows Version 3.1 or Windows 95.

Printer: Hewlett-Packard LaserJet or compatible printers  are recommended. InkJet printers may be used;
however, their report printing performance is not as  reliable as the LaserJet.

Mouse: Microsoft compatible mouse or other compatible pointing device.


RMP* Submit User Manual   February 1999                                               Ch. 1 Pg. 2

-------
Using a slower processor and/or less memory will significantly impact performance, with memory being
the greater factor.

RMP*Submit may also be run under Windows 95; however, users may cause General Protection Faults

(GPF) to occur if they use Windows 95 graphical elements such as the E3 (Close) button in the right-hand
corner of the title bar. As a result, users may experience unexpected results if they do not close
RMP*Submit forms under program control by using the Close button. Additionally, installing some
Microsoft Office 95 or Microsoft Office 97 applications after RMP*Submit has been installed may cause
the Jet 2.5 Dynamic Link Library (DLL) to be replaced with the 32 bit Jet 3.0 or Jet 3.5 database DLL. As
a result, users may experience unexpected results. Section 2.2 further addresses this issue.

B.2    Installation Procedures

The RMP*Submit installation disks will install the software on your computer's hard drive.

                       Instructions for Installing and Running RMP*Submit

To install RMP*Submit from the four-disk set:
2.1nsert diskette 1 into your floppy disk drive (drive A:).

3.1n Windows 95, click the Start Button, then click Run. In Windows 3.1, choose Run from the Program
Manager File menu.

4.EnterA:SETUP.EXE

5.Click OK to start the setup program, then follow the setup program instructions.	
To install RMP*Submit from CD:
1.Insert the RMP*Submit/RMP*Comp CD into your CD-ROM drive.

2.1n Windows 95, click the Start Button, then click Run. In Windows 3.1, choose Run from the Program
Manager File menu.

3.Enter d:\SUBMIT\RMPSUBMT.EXE   [where "d" is your CD-ROM drive letter].

4.Click OK to start the setup program, then follow the setup program instructions.	
RMP* Submit User Manual   February 1999                                               Ch. 1 Pg. 3

-------
To install RMP*Submit from Internet download:
1.Download the file RMPSUBMT.EXE and save it to directory of your choice. Information on
RMP* Submit can be found at http://www.epa.gov/ceppo/rmpsubmit.html

2.1n Windows 95, click the Start Button, then click Run. In Windows 3.1, choose Run from the Program
Manager File menu.

S.Enter c:\path\RMPSUBMT.EXE  [replace c:\path with the directory location where
RMPSUBMT.EXE was saved}. Alternatively, you may click Browse to locate the file.

4.Click OK to start the setup program, then follow the setup program instructions.	
B.3    Starting and Exiting RMP*Submit

To Run RMP*Submit from Windows 95:
1 .Click the Start Button, and point to Programs to get a list of all your installed programs.
2.Point to RMP Submit, and click on RMP-Submit.

Or, if you have the RMP Submit explorer window open, simply double click on the RMP-Submit icon.
To Run RMP*Submit from Windows 3.1
1 .In the Program Group window RMP Submit double-click on the RMP-Submit icon.
To exit RMP*Submit
1. Click Exit from the Main Menu or select  from the menu bar.

2. The application will prompt you with the message, "Are you sure you want to exit RMP* Submit?"
Click Yes.
C.     BASIC CONCEPTS

C.I    Risk Management Plan Structure

The RMP is comprised of nine sections and an Executive Summary.  Section 1 Registration Information
has three additional sub-sections. These entities are: 1) the covered processes that are being reported, 2)
the process chemicals that are being reported for each covered process, and 3) the North American
Industrial Classification System (NAICS) codes associated with each covered process.  Additionally,
Section 1 has an entity that contains the flammable chemicals in a flammable mixture registered for a
covered process.  Sections 2 through 5 contain data reported for the following four Off-site Consequence
Analysis  (OCA) scenarios: Toxics Worst Case, Toxics Alternative Releases, Flammables Worst Case,
and Flammables Alternative Releases. Section 6 contains Accident History data. Accident History also

RMP* Submit User Manual   February 1999                                               Ch. 1  Pg. 4

-------
has an entity for reporting the chemicals that were involved in the accident. The Accident Chemical entity
has another entity for reporting the flammable chemicals that were part of the flammable mixtures
involved in the accident. Section 7 contains prevention program data for Program Level 3 covered
processes, and Section 8 contains prevention program data for Program Level 2 covered processes.  Each
prevention program section has an entity that lists one or more chemicals reported for the prevention
program.  Section 9 defines the facility's Emergency Response Plan.

RMP*Submit is designed to ensure that chemicals reported in Sections 2 through 5 are related to the
chemicals that were previously registered for covered processes. Similarly, chemicals and NAICS codes
reported in Sections 7 and 8 must be related to chemicals and NAICS codes that were previously
registered for covered processes. To accomplish this, RMP*Submit will allow users to select only
logically correct chemical and NAICS code information for Sections 2 through 5, 7, and 8.  To the user
this means that covered processes must be created first, and these registered chemicals and NAICS codes
must be used for reporting in the later sections. Since Section 6, Accident History, does not limit the user
to the selection of chemicals and NAICS codes that were reported for the covered processes, any chemical
or NAICS code in the RMP*Submit lookup tables provided may be selected.

C.2     Navigating RMP'Submit

This section describes how to navigate within RMP*Submit using either a mouse or keyboard.
RMP*Submit functions can be accessed from either the menu bar or command buttons. You can access
functions from the menu bar or the command buttons on each screen.

C.2.1 Command Button Footer

The footer to the List of Risk Management Plans Screen contains command buttons that provide access to
the primary capabilities within RMP*Submit.  Each command button has an underlined accelerator key
associated with it.  Pressing the Alt key and the underline key is the same as clicking on the button with
the mouse. For example, press  on your keyboard to select Print.

The List of Risk Management Plans Screen footer displays the following command buttons, which are
described in Exhibit 1.
            Hew
Edit
Delete |
Check |
Print |
Submit 1
Close
1
These command button functions are described in Exhibit 1.
Button
New
Edit
Delete
Check
Function
Create a new RMP for a
facility.
View or edit an RMP.
Delete the selected RMP.
Validate the selected RMP.
RMP* Submit User Manual   February 1999
                                                              Ch. 1 Pg. 5

-------
Print
Submit
Close
Print the selected RMP.
Create a submission file
text file.
for the selected RMP by exporting RMP data to an ASCII
Return to Main Menu.
                              Exhibit 1. Command Button Functions
C.2.2  Menu Bars

Menu bars contain commands within RMP*Submit.  Any of the menu items may be invoked by using your
mouse to click on the item or pressing the underlined accelerator key corresponding to the function.

RMP*Submit provides menu bars for the Main Menu; List of Risk Management Plans; Data Entry
(Sections 1 through 9 and the Executive Summary); and Report Options screens.  The screens contain the
following menu items;  their functions are summarized in Exhibit 2.

•      Main Menu - File, Edit, and Help.

•      List of Risk Management Plans - File, Tools, and Help. The list of Risk Management Plans does
       not appear until after an RMP file has been created.

•      Data Entry (Sections 1 through 9 and the Executive Summary) - File, Edit, and Help.
       Registration Information (Section 1) contains a Sections menu in addition to File, Edit, and Help.

•      RMP Report Options - File and Help.
Menu/Submenu Item
Function
Main Menu File Menu
Import
Exit RMP'Submit
Import an RMP from an ASCII file.
Close the RMP'Submit application.
Main Menu Edit Menu
RMP
Data Entry
Options
User Settings
Go to RMP submenu items.
Go to RMP Data Entry form.
Go to Options submenu items.
Display user settings.
List of Risk Management Plans File Menu
New
Edit
Create a new RMP.
View or edit a selected RMP.
RMP* Submit User Manual    February 1999
Ch. 1 Pg. 6

-------
Menu/Submenu Item
Delete
Submit
Print
Close
Exit RMP'Submit
Function
Delete a selected RMP from the database.
Create a submission file for a selected RMP.
Display the RMP Report Options Screen to print an entire RMP or
section of an RMP.
Close the current form and return to the Main Menu.
Close the RMP'Submit application.
List of Risk Management Plans Tools Menu
Check
Validate the selected RMP.
Data Entry File Menu
Print
Close
Exit RMP'Submit
Display the RMP Report Options Screen from which you can print an
entire RMP or section of an RMP.
Close the current form.
Close the RMP'Submit application.
Data Entry Edit Menu
Undo / Esc
Cut/Ctrl+X
Copy / Ctrl+C
Paste / Ctrl+V
Find / Ctrl+F
Replace / Ctrl+H
Undo your data entry; clear data in current field.
Cut selected text and copy to the Windows clipboard.
Copy selected text to the Windows clipboard.
Paste selected text from the Windows clipboard.
Search for a string of text within the current RMP.
Search for a string of text within the current RMP and replace it with
another string of text.
Data Entry Sections Menu (Registration Information only)
2. Toxic Worst Case
3. Toxic Alt. Release
4. Flamm. Worst Case
5. Flamm. Alt. Release
6. Accident History
7. Prev. Prog. Level 3
8. Prev. Prog. Level 2
Go to Section 2 - Toxics Worst Case for the current RMP.
Go to Section 3 - Toxics Alternative Release for the current RMP.
Go to Section 4 - Flammables Worst Case for the current RMP.
Go to Section 5 - Flammables Alternative Release for the current RMP.
Go to Section 6 - Accident History for the current RMP.
Go to Section 7 - Prevention Program 3 for the current RMP.
Go to Section 8 - Prevention Program 2 for the current RMP.
RMP* Submit User Manual   February 1999
Ch. 1 Pg. 7

-------
Menu/Submenu Item
9. Emergency Response
Executive Summary
Function
Go to Section 9 - Emergency Response Plan for the current RMP.
Display the Executive Summary for the current RMP.
RMP Report Options File Menu
Print Setup
Close
Exit RMP'Submit
Open the Print Setup Dialog Box.
Close the current form.
Close the RMP'Submit application.
Help Menu (all sections)
Contents
Search for Help on...
Technical Support
About RMP'Submit
Go to on-line Help Contents Screen.
Go to on-line Help Search Index.
Display information on CEPPO Technical Support.
Display information on RMP* Submit.
                           Exhibit 2. RMP Submit Menu Item Functions
C.3.3  Navigating with a Mouse and Command Buttons

Use the Back and Next buttons to move forward and backward between "pages" of a data entry form.
Click the Close button to close the form. The Back, Next, and Close buttons appear at the footer of
Sections 1 through 9 data entry screens.
                                 < Back  11  Next > |   Close  |
Use the Sections buttons to go to Sections 2 through 9 or the Executive Summary from the Registration
Information section.  In Sections 2 through 9 and the Executive Summary, when you reach the end of a
data entry form, you must close the form and return to the Registration Information section before
proceeding to another section.
2. Toxic
Worst Care
3. Toxic fk. 1 4. Flamm.
Release | Worst Case
5. Flamm. 1 6. Aicident
fk. Release | History
7. Prev. I 8. Prev.
Prog. Level 3 | Prog. Level 2
9. Briergency 1 Executive
Response | Summary
RMP* Submit User Manual   February 1999
Ch. 1 Pg. 8

-------
C.3.4  Navigating with a Keyboard
Exhibit 3 describes the keyboard equivalents that can be used to navigate within RMP*Submit.  Notice
that the  key can be used to navigate between fields, much like using a mouse. Press  to go
to the next field or  to go to the previous field.  Using  is preferable to using ,
which can cause previously entered data to be lost.
To navigate between sections of a form:
Press
F6
Shift+F2
Shift+F6
To
Cycle forward through the header, detail section, and footer of a form.
For computers attached to Novell servers, this key may be disabled.
Zoom - to increase the size of a data entry box.
Cycle back through the footer, detail section, and header of a form.
To navigate in forms with more than one page:
Press
Page Down
Page Up
To switch between modes:
Press
F2
To
Move down one page. At end of record, moves to top of next record.
Move up one page. At top of record, moves to top of previous record.

To
Switch between editing mode (with insertion point displayed) and
navigation mode (entire field selected).
To navigate between fields and records (in navigation mode):
Press
Tab, Right Arrow, or Enter
Ctrl+Tab
Shift+Tab
Ctrl+Shift+Tab
Ctrl+Shift+Home
End
Ctrl+End
Home
Ctrl+Home
Ctrl+Page Down
Ctrl+Page Up
To
Move to the next field. Note: The Enter key will behave differently if
you have changed the default using the View menu Options command.
Exit the subform and move to the next field in the master form; if not
in a subform, move to the next field.
Move to the previous field.
Exit the subform and move to the previous field in the Master form; if
not in a subform, move to the previous field.
Move to the first field in the master form.
Move to the last field in the current record.
Move to the last field in the last record.
Move to the first field in the current record.
Move to the first field in the first record.
Move to the current field in the next record.
Move to the current field in the previous record.
To navigate in a combo box or list box:
Press
F4 or Alt+Down Arrow
Down Arrow
Page Down
Up Arrow
Page Up
Tab
To
Open a combo box or list box.
Move down one line.
Move down one set of values.
Move up one line.
Move up one set of values.
Exit the box.
To navigate within a text box (when data is not selected):
Press
Down Arrow
To
Move down one line.
RMP* Submit User Manual    February 1999
Ch. 1 Pg. 9

-------
Up Arrow
End
Ctrl+End
Home
Ctrl+Home
Move up one line.
Move to the end of the current line.
Move to the end of the last line.
Move to the beginning of the current line.
Move to the beginning of the first line.
                            Exhibit 3. RMP Submit Keyboard Equivalents

C.4  Entering Data in RMP'Submit

C.4.1  Drop Down Lists

Drop down lists are provided to ensure that users select appropriate choices for RMP data elements where
applicable.  Lookup tables used to populate drop down lists are part of the PvMP*Submit application, not
the RMP database.  To select a value from a drop down list, click the down arrow to the right of the list to
see the list and click the desired value to enter it in the field. Pressing  will also open the drop down
list that currently has the focus. Long drop down lists have up and down arrows for scrolling through the
list.  You may also type in the  first character of the value you want to select from the list. RMP*Submit
will fill in the selection with the first value from the list that matches the characters you type. Exhibit 4
indicates drop down list data fields with values restricted to the list.  Exhibit 5 shows drop down list data
fields that allow the user to enter other values not limited to list (i.e., you can either select a value from the
list or enter your own).
 Section 1 Facility:
 Facility State
 Facility County
 Owner/Operator State
 Latitude/Longitude Method
 Latitude/Longitude Description
 NAICS
 Chemical Name
Section 5 Flammables Alternative Release:
Chemical Name
End Point Used
 Section 1 Flammable Mixture:
 Chemical Name
Section 6 Accident History:
NAICS Code
Chemical Name
Weather Conditions: Wind Speed Unit Code
Weather Conditions: Wind Direction
Initiating Event
 Section 2 Toxics Worst Case:
 Chemical Name
 Physical State
 Scenario
 Topography
Section 6 Flammable Mixture:
Chemical Name
 Section 3 Toxics Alternative Release:
 Chemical Name
 Physical State
 Topography
Section 7 Prevention Program 3:
NAICS
Chemical Name
RMP* Submit User Manual    February 1999
                                   Ch. 1 Pg. 10

-------
Section 1 Facility:
Facility State
Facility County
Owner/Operator State
Latitude/Longitude Method
Latitude/Longitude Description
NAICS
Chemical Name
Section 4 Flammables Worst Case Scenario:
Chemical Name
Section 5 Flammables Alternative Release:
Chemical Name
End Point Used
Section 8 Prevention Program 2:
NAICS
Chemical Name
Exhibit 4. Drop Down List Data Fields With Restricted Values
Section 1 Facility:
LEPC
Last Safety Inspection Performed By
Section 2 Toxics Worst Case:
Model Used
Section 3 Toxics Alternative Release:
Model Used
Scenario
Section 4 Flammables Worst Case Scenario:
Model Used
Section 5 Flammables Alternative Release:
Model Used
Scenario

                  Exhibit 5. Drop Down List Data Fields With Unrestricted Values

C.4.2  Entering Date and Time
Date fields can be entered in several different formats as shown by the following examples.
 8/16/98                 8/16/1998

 aug-16-1998            aug-16-98

 aug-16 (inserts current year)
August 16, 1998         August-16-1998

aug 16 98               16 aug  1998

 inserts current date into field
No matter which format is used to enter the date, it will display in the format 08/16/1998. Check to
ensure that you have entered a valid date.  RMP*Submit also validates the date field as follows: If you
enter a year between 100 and 1899, RMP*Submit will not save your entry. If you enter a year between
1900 and 1949, RMP*Submit will add 100 years to the  date. Any date greater than 1949 will be accepted
as is.
RMP* Submit User Manual    February 1999
                                   Ch. 1  Pg. 11

-------
C.4.3  Facility Address Carry-Over

If your owner/operator mailing address is the same as your facility address, RMP*Submit provides a
simple way to fill in the address fields.  Click the Copy Facility Address button to automatically fill in
this information.

C.4.4  Check Boxes

Many of the data fields in RMP*Submit are check boxes. In RMP*Submit, check boxes are yes/no fields
that default to "no." A check indicates a response of "yes." Clicking inside the boxes or pressing the
space bar toggles the check mark (X) on and off.

C.4.5  Status bar

The status bar displays helpful formatting information and brief instructions about selected fields,
command buttons, or menu items.  The status bar appears in the lower left-hand corner of the
RMP*Submit window.  More detailed field help is available by pressing , as described elsewhere in
this document.

C.4.6  Reversing Data Entry Changes

RMP*Submit provides two ways to undo keyboard inputs using the  and  keys.
 is used to undo a previous action in almost all Windows (and DOS) programs. Its behavior is
the same in RMP*Submit. If you inadvertently delete, type over, or copy into a data field, its previous
value can be restored by pressing the Ctrl and Z keys simultaneously, which will  either undo or redo your
last action.  This keyboard editing technique may also be performed using the Edit, Undo menu item.
Note that the menu item displays Undo Delete or Undo Typing depending on what you did last.

Some data entry forms allow you to enter many instances of data, such as several  Program Level 2
prevention programs where data for each prevention program is stored in a record in the database table for
Prevention Program 2 data.  When you open one of these data entry forms you can view and edit all
existing records, one at a time. A record navigation control is provided on the bottom left portion of the
data entry form. Each time you bring up an existing record from the database, its contents are put into a
copy buffer. As you edit existing data or enter new data, the data is written to this copy buffer. When the
current record loses focus such as when you go to the next or a new record or when you close the form,
the contents of the copy buffer are written back to a record in the appropriate database table. This
automatic saving of data is why you do not see any Save buttons in RMP*Submit as you might in other
database programs.  The Esc key has a special relationship to the copy buffer. If you want to undo the
last entry of data into a field, press the Esc key. This will re-establish the previous contents of the field.
If you want to undo all edits to a record, press the  Esc key twice.  For example, let's say during an edit
session you bring up a record and begin to edit several fields.  You suddenly realize that this is the wrong
record. Simply press the Esc key twice and the copy buffer will be refreshed with the original data,
enabling you to safely leave the record without destroying its original contents.
RMP* Submit User Manual   February 1999                                               Ch. 1 Pg. 12

-------
C.5.   Saving/Backing Up RMP'Submit Data

It is important that you create backup copies of your RMP* Submit data, to avoid having to re-enter the
information after a system malfunction. There are several circumstances that can result in the loss of your
data:

               A hard drive failure may require you to re-format or to replace your drive.
               If your computer is turned off while the system is updating the RMP database, the
               database can become corrupt and unusable.
               If, for any reason, you re-install the RMP* Submit application, the RMP database will be
               overwritten with a new, empty database file.

To backup your RMP data, simply copy the file SRMPDATA.MDB to an alternate location.
SRMPDATA.MDB can be found in the directory or folder to which you installed the RMP* Submit
application, usually C:\RMP.  It is recommended that you copy this file to a diskette  (the A drive), or to
some other removable media (such as a zip drive).  You may also choose to copy the file to a network file
server drive. The important point is that the file be copied to a drive that is different  from the one you are
using to run RMP* Submit. You should exit the RMP* Submit application before making the backup
copy.  The frequency of backup depends on how much time you spend entering data. Making a backup
after each hour of data entry means that you will have, at most, one hour of data re-entry after restoring
from the backup copy.

To restore your data, copy the file  SRMPDATA.MDB from the backup location into the directory of
folder to which you installed the RMP* Submit application, usually C:\RMP, overwriting if necessary the
SRMPDATA.MDB file that may already be there.  In case of re-installation of RMP*Submit, perform the
re-installation before copying the SRMPDATA.MDB backup copy.

D.     USING RMP'SUBMIT

D.I    Welcome to RMP'Submit

When you start RMP*Submit, the Welcome to RMP*Submit Screen appears. The Welcome Screen
(Exhibit 6) summarizes the steps for entering and submitting RMP data. Click the Close button to close
the Welcome Screen and go to the Main Menu. To disable the Welcome Screen so that it does not display
again, click the "Don't display this message again" box at the bottom of the Welcome screen.  To re-
enable the display of this dialog box, select Edit -> Options - > User Settings from the menu bar of the
Main Menu.
RMP* Submit User Manual   February 1999                                              Ch. 1 Pg. 13

-------
                    RMP'Sutait
                       Don't display this message again. l~
Close
                                Exhibit 6. Welcome to RMP*Submit
        Tip    When the Welcome to RMP*Submit Screen first appears, clicking the vertical scroll bar
               may cause all the text to be highlighted (selected). If so, simply click inside the text box
               or press  to clear (unselect).
RMP* Submit User Manual    February 1999
         Ch. 1 Pg. 14

-------
D.2     Main Menu
The Main Menu form (Exhibit 7) provides access to three major functions: Data Entry; Import; and Exit.
The Main Menu form is a "switchboard" type form used to access all of the features of RMP*Submit.
        II £'l«  Edit  look

                                     for

              Ctawnical En»eifl«wcf Pwpatwtlwe** wid Pt*¥*wliott Qffc*
                                                                      ijDatajErrtrj;]
                                                                        Import
                                                                      De Register
                                                                         Bat
         Edit existing (or ^dd n&w] Risk Management Plan (RMP)
                                                                             HUM
Exhibi
      t7.
                                            Main Menu
D.3     Data Entry
The Data Entry function allows you to add new or edit existing RMPs.  The Data Entry function provides
the capability to capture data elements for the Executive Summary, Registration, Worst Case, and
Alternative Release Scenarios, Five-Year Accident History, Program Level 2 and Program Level 3
Prevention Programs, and Emergency Response Plan sections of the RMP.

1.       From the Main Menu, click the Data Entry button. If you have not previously created an RMP
        or if there are no existing RMPs, you will go directly to the Section 1 Registration Information
        Screen.  If you have existing RMPs, the List of Risk Management Plans Screen will be displayed
        (Exhibit 8).  The List of Risk Management Plans Screen displays a list of previously entered
        RMPs, by facility name.

2.       Double-click a facility name to go to the Section  1 Registration Information Screen.

3.       Single-click a facility name to select an RMP and execute any of the following RMP functions:
        edit selected RMP, delete selected RMP, check selected RMP, print selected RMP, or submit
        selected RMP.  Section 4.1 describes the check, print, and submit functions.

4.       To delete a selected RMP, click the Delete button. All records related to the selected RMP are
        deleted.
RMP* Submit User Manual    February 1999
Ch. 1  Pg. 15

-------
5.
Click New to create a new RMP for this, or another facility.
lit (IMF-Submit - [Data Enlrel

iJjFte loots Help .JjJ^
...>-.-.«. , -- . F©flri flppfQutd: 7/1998
— :- 	 -' : "• 'v-': : • r -•''"•-: ^.; --." : •'-'' '. •- -. "- QMS Control Nucntxr: 2050-014*
Single click on Facility name to select its RMP.
Double click on Facility name to edit its RMP.
Facility Name
i '• c '•'• "'--•i-':!^ '•

Description (click heie to change il]

Press iyt key •*• underlined letter to execute ene ©f the f ©lie wino eemmands:
| jew ] | EcB ] | Belete ] | Cheefc
Double click on facily to view registration data.
| Erlnt ] | Submit ] | Close ]
I 	 NU!M 	
                             Exhibits.  List of Risk Management Plans

D.3.1   Adding and Editing RMP Data

The Section 1 Registration Information Screen (Exhibit 9) is the cornerstone for assembling your RMP
data.  RMP Sections 2 through 9 and the Executive Summary for a given facility are only accessible while
the Registration Information Screen for the facility is open. This approach ensures that the data you enter
is for the correct facility when using RMP*Submit to create RMPs for more than one facility.

        Tip    Pressing  selects/deselects previously entered data in the field that has the focus and
               switches between editing mode (with insertion point displayed) and navigation mode
               (entire field selected).
RMP* Submit User Manual    February 1999
                                                                               Ch. 1  Pg. 16

-------
                 HMP'Submil - [New Facility]
                     Ed       Help
                           'I,
                  I. Toil
£ |i,      1       I       rj
                                                                   1 i»
ȴ I       1
                      x ktontfestteni
                   M* FtaiMM^

                   h. Pai f rrt Company H ll.imp:

                   e. Parent l^empanif S Harnei




                 1.3   :PA          •;

                    i and in^treiA Mumb^r^
                                     I
                   h.Paieirt Company ai HI MIS: ['"

                   c. Parent Comp.iny ?3 DUIIS: |

                Erter Fadlllf Mans.

                            Exhibit 9.  Section 1 Registration Information

To further assist you in preparing your RMP, the application will not allow you to enter data for Sections
2 through 5, 7, and 8 until you have created processes, registered chemicals, and selected NAICS codes
that are logical for each section.

Using the  and  keys or the mouse to move from field to field, enter data in Section 1
as indicated in the Risk Management Plan Data Element Instructions using the navigation and data entry
concepts described in Section 3.0 of this document.  For data elements l.S.g through 1.5.J, you must enter
the latitudinal and longitudinal coordinates for your facility, the method for determining latitude and
longitude, and the description of location identified by the latitude and longitude.  To obtain Help in
enteringygurfacili^datitude and longitude information, click the Latitude Longitude Help button.
 Latitude Longitude Help
Further, only Process chemicals and NAICS codes that are appropriate for an RMP section will be
available through drop down lists in each section.  For example, you will not be able to prepare Toxics
Worst Case scenarios until you have registered some toxic chemicals. Conversely, you will never be
allowed to select a flammable chemical or substance when you are preparing a Toxics Worst Case
scenario.  To register chemicals in a covered process:

1.       Click the Processes button located at the bottom of the last page of the Registration Data Entry
        form. (The number in parentheses indicates the number of processes that you have already
        entered.)  The 1.17 Processes Dialog Box is shown in Exhibit 10. You cannot access other menu
        commands or switch to another form while the dialog box is open.
RMP* Submit User Manual    February 1999
              Ch. 1 Pg. 17

-------
        Enter a description for your process (optional).  This description may be helpful in selecting
        chemicals in other sections of the RMP, but the description will not be submitted to EPA with the
        RMP data.

        Enter a program level: 1, 2, or 3.  You will not be allowed to enter NAICS codes or chemicals
        until you enter the program level for the process.  The program level that you enter here relates to
        other sections of the RMP, so once you have entered the program level, the only way you can
        change it is by deleting the Process record and entering a new Process record.  For further
        information, see Program Eligibility Criteria in the Risk Management Plan Data Element
        Instructions.

        Click the NAICS Codes button.  The NAICS Codes button displays the total number of NAICS
        codes you have selected for the process.

        Select the NAICS code associated with the process or select a NAICS code from the drop down
        list. To delete a NAICS code, click the Delete NAICS Code button, while the NAICS code has
        the focus. Click Close to return to the Processes Dialog Box.

        From within the Process/Chemicals subform, select a Chemical Name to register for the process.
        Chemicals are restricted to the drop down list.

        Enter the quantity (in pounds) of each chemical in the process.

        Select a chemical and click the Delete Chemical button to delete a previously entered chemical
        from a process.  RMP*Submit displays a message box stating the chemical name to delete.

        Click the Close button at the bottom of the screen to return to Section 1 Registration Information.

 Exhibit 10.

                                                      &t® pin olainmg CttnlhfanlU Business  f-
                                                      Infoimation (Oil) in this section?      *
                        1

                                                                                (1)
                          /

                 ID  ChemteBl Nmn@
                                 Ttt ®dcl nn®tii@r pr«e*»»     Hm "Jltfti" button nt the Kwttmn wf the »«r«en.
                           PlI-VIOIIS
                                      IS  I I       I


                Opionai Betciplion to hnlp you tack myliple      as you ill out tie FSMP,   pfpf
  Processes
                                            Dialog Box
RMP* Submit User Manual    February 1999
Ch. 1  Pg. 18

-------
The table in Exhibit 11 describes the functions of the command buttons located at the bottom of the
Processes Dialog Box. These functions apply to the entire process, not just the process chemicals in the
subform.
Button
Back
Next
Add
Delete
Close
Function
Go to previous process.
Go to next/ new process.
Add a new process.
Delete a process (including all related NAICS code and chemical
data).
Close the Processes dialog box and return to the form.
                           Exhibit 11.  Processes Dialog Box Functions

To enter chemicals in a flammable mixture:

1.      Select Flammable Mixture from the Chemical Name drop down list.  The Chemicals in
       Flammable Mixture Dialog Box appears (Exhibit 12).

2.      From the drop down list, select the chemicals that comprise the flammable mixture.

3.      Click Close to return to the Processes dialog box.
RMP* Submit User Manual    February 1999
Ch. 1 Pg. 19

-------
Note: Each time a chemical is registered for a specific process, it is removed from the drop down list.  The
only exception is "Flammable Mixture," which may be selected more than once.
             RMP'Submil - [Covered processes for Facility: New Facility]
           3 file Edit Help
                                                      Are you claiming Confidential Business  i—
                                                      Information (CBI) in this section?
                    Chemicals in Flammable Mixture
           Process ID
              Delete Chemical
                               To add another process, press the "Add" button at the bottom of the screen.
                                                       Delete
                                                      Process
            Enter Quantity in pounds. (Use 2 significant digits.)
                                                              iFLTR i
                                                                               :NUM (
                        Exhibit 12. Entering Chemicals in Flammable Mixture

To enter data in Sections 2 through 9 and the Executive Summary:
1.       Click one of the Section buttons at the top of the screen to go to a particular section of the RMP.

2.       Enter data as indicated in the Risk Management Plan Data Element Instructions and using the
        navigation and data entry concepts described in Section 3 of this document.

To enter chemicals reported in an accident history:

1.       Click the Chemicals button in Section 6 Accident History. The Chemicals in Accident Fiistory
        Dialog Box displays (Exhibit 13).

2.       Enter the chemical name, quantity, and percent weight (optional) for each chemical reported in
        your Accident Fiistory,  as appropriate.

3.       If the release was a flammable mixture containing regulated flammables, list it as a flammable
        mixture and list all of the regulated substances contained in the mixture.  Follow the instructions
        in Help for entering a flammable mixture  for registering a chemical for a covered process.
RMP* Submit User Manual   February 1999
Ch. 1  Pg. 20

-------
4.
5.
Select a chemical and click the Delete Selected Chemical button to delete a previously entered
chemical.

Click the Close button to close the Chemicals in Accident History Dialog Box and return to the
Accident History form.

                a. Chemical Name
                                              CAS Number
jVinylidene chloride [Ethene, 1,1-dichloro-J
                                                       75-36-4
 b. Quantity    c. %
tele as ed (Ib g)  Weight
                                                                       20
                23.0!
       J1 -Chloropropylene [1 -Propene, 1 -chlora-]
                                            *  59B-21-6
          45
                                                                             12.0!
                    Delete Selected Chemical
                             Exhibit 13. Chemicals in Accident History

To enter a chemical name for all regulated substances held above the threshold in the covered units
(Sections 1 and 8):

1.      Click the Chemicals button in Section 1 or Section 8. The Chemicals from Covered Process
        Dialog Box appears (Exhibit 14).

2.      Enter the chemical name using the scroll bar to the right of the field.

3.      To delete a chemical from the list of Chemicals from Covered Process, select a chemical, and
        click the Delete Chemical button.

4.      Click the Select All button to select all the Prevention Program 3 (Section 7) or Prevention
        Program 2 (Section  8) chemicals and add them to the Chemicals from Covered Process.

5.      Click the Close button to close the Chemicals from Covered Process Dialog Box.
RMP* Submit User Manual    February 1999
                                                                                Ch. 1 Pg. 21

-------

                        Chemical Hame
               l -Butene
                lammatale Mixture
               Delete Chemical
Select All
Close
                    Exhibit 14. 7.2 Chemicals from Covered Process Dialog Box

Required data in Sections 1 through 8 can be claimed as Confidential Business Information (CBI) in
accordance with CBI rules and regulations.  RMP*Submit Help provides further information on RMP data
that can be claimed as CBI and how to make a claim.  To claim CBI:

1.       Click the CBI check box to claim required data as CBI for that section (Exhibit 15).  A warning
        message will appear that briefly states the conditions for claiming CBI.  Click the "Don't display
        this message again" box to disable the warning message.

2.       If claiming chemicals as CBI in the Registration Section (data element 1.17), check the CBI check
        box at the top right-hand corner of the dialog box.  This adds CBI generic chemical categories to
        the chemical drop down list.

3.       If claiming chemicals as CBI in Accident History (data element 6.5), check the CBI check box on
        the Section 6 Accident History form. This adds CBI generic chemical categories to the chemical
        drop down list.

4.       If claiming the chemical quantity as CBI in the Registration Section (data element 1.17), check the
        Qty CBI box in the Process Chemicals subform and leave the quantity field blank. The Qty CBI
        check box will only be visible when the CBI check box in the Processes Dialog Box is displayed.
RMP* Submit User Manual    February 1999
                                         Ch. 1  Pg. 22

-------
                  DMP-Gubmil - [New FacStji]
                     Edl Help

                 FremUanPMiriiiilD;  1             1
                      Desriplioic
                  (Us      to
                            Julia       ysj
                  u
                   it file                   or                       j       '
                   h. Select all l-ederal ar           ar                   nil
                   to demonsti ,ite comiiliance with the -satetv iiitoi mation requirement     at least ens):
                          i 1 (•    ]••    an   mi F               F
                                    (• CFR      r               r
                                               r           Hone: F

                 Isreenlnfl
                                                                     I
                Bll|Record:[l
of 1
                 Eritor
                               j jeggipfa
                                          POM
                    Exhibit 15.  Claiming Confidential Business Information
To enter Executive Summary text:
1.      Click the Executive Summary button from the Section 1 Registration Information Screen or
        select Executive Summary from the Sections menu. The Executive Summary Screen will appear.

2.      Enter a brief description of your facility's risk management program. The text will wrap around
        to the next line as you type.  To create a new line press .

D.3.2   Checking RMP Data

To help ensure that your RMP is complete and accurate, RMP*Submit checks many (but not all) data
fields as you enter data.

•       If you skip an essential field, RMP*Submit prompts you to enter data before proceeding.

•       If you enter a value outside the acceptable range of values, RMP*Submit prompts you to enter an
        acceptable value before proceeding.

•       If you attempt to leave a record that contains blanks in required fields, RMP*Submit asks if you
        want to identify the required fields in the form that have not been filled in.

•       RMP*Submit has an extensive validation function that checks an entire RMP and allows you to
        create a report of all errors.
RMP* Submit User Manual   February 1999
                                                          Ch. 1  Pg. 23

-------
To have RMP*Submit check your RMP data for errors:
1.      Select an RMP and click the Check button from the List of Risk Management Plans Screen.  If
       RMP*Submit finds any errors it will prompt you to view the error report.

2.      The validation function will also be executed automatically each time you "Submit" an RMP as
       described in Section D.3.4.

D.3.3  Printing RMP Data
RMP*Submit provides the capability to print an entire RMP or selected parts of an RMP from within any
section of the current RMP.
1.


2.

3.


4.

5.
Click Print from the List of Risk Management Plans Screen or select  from the
Menu bar. The RMP Report Options Dialog Box will appear (Exhibit 16).

Click Entire RMP or select a section or subsection of the RMP to print.

Click the Preview button to view your RMP before printing.  When you preview an RMP, each
section is displayed as a separate report. You may print or close each report as appropriate.

Click the Print button to send the RMP directly to the printer without previewing it.

Click the Cancel button to return to the previous Data Entry screen.
• RMP Report Options
Of

Entire RMP
Facilit
Off site
IX: Include Validation Error Report
y Information [Section 1) P
Registration Information
Processes
s Consequence Analysis P
p
p

Toxics Worst Case Scenario (Section 2] P
Toxics Alternative Release (Section 3) P
Flammables Worst Case Scenario (Section 4) P
Flammables Alternative Release (Section 5) P
Accident History (Section 6) P
Preve
ntion Programs P
Program 3 (Section 7)
Program 2 (Section 8)

p
p
Emergency Response Plan (Section 9) P
Executive Summary P

I*

Preview
Print |
Cancel

                                Exhibit 16. RMP Report Options

RMP* Submit User Manual   February 1999
                                                                             Ch. 1 Pg. 24

-------
D.3.4  Submitting RMP Data
Once you have completed entering your RMP data, you can create a disk for submitting your RMP to
EPA.

1.      Insert a formatted 3.5-inch disk into the appropriate drive.

2.      Select an RMP from the List of Risk Management Plans Screen and click the Submit button.

3.      A message box will display, asking if this is your first submission, a correction or a re-
       submission. If you answer "Correction" or "Resubmission," RMP*Submit will check to make
       sure that you have  entered your RMP Facility Identifier. See Chapter 5 for more information
       about submitting.

4.      Next, RMP*Submit prompts you to enter an output drive letter (Exhibit 17).

5.      Enter the drive where you want to save your RMP (Drive A: is the default), and click OK. For
       example, if your 3.5-inch disk drive is drive B:, you would enter "b". Next, another message box
       will display that  says, "RMP will be  output to file a:\rmp.txt. Is diskette in Drive?" (A:
       represents the  output drive you have  chosen).  Make sure that your disk is in the correct drive and
       click OK.  Your RMP is output (saved) to your submission disk with the filename rmp.txt.  The
       Submit function  will automatically validate the selected RMP. If there are no critical errors,  the
       RMP will be exported to a text file. You will also be asked if you would like to preview the error
       report described  in Section 4.3.2.  If critical errors are found during validation, the submission
       will be terminated. View the error report to see where errors exist in your RMP.

                              Entei Output Drive Letter
                                                                Xl!
                                                          OK
                                                        Cancel
                                  Exhibit 17.  Submitting RMP
RMP* Submit User Manual   February 1999
Ch. 1 Pg. 25

-------
D.4    Import

You may have RMP data from another source that you want to import into RMP*Submit to utilize its
validation functions. The data must be in an ASCII file formatted in accordance with the SRMP ASCII
Interface Control Document.

1.      Click the Import button from the Main Menu Screen.  The Select File Dialog Box appears.
2.      Select the drive, folder, and specific file name of the RMP to import into RMP*Submit.
3.      If errors are detected in importing your text file, you will receive an error message.
4.      Click OK to display the error message log for your RMP. The RMP Import Error Log Screen
       will display. Select  to view or print the RMP Import Error Log.
RMP* Submit User Manual    February 1999                                              Ch. 1 Pg. 26

-------
2.     DATA ELEMENT INSTRUCTIONS

EXECUTIVE SUMMARY
The executive summary must include a brief description of your facility's risk management program. You
determine the length; it may be as short as two or three pages or, if you have many processes, it may need
to be more lengthy. You should view the Executive Summary as an opportunity to communicate in your
own words the nature of the risks posed by your facility to your community and to explain what you have
done to minimize that risk.  The summary can be an excellent vehicle to display the effort and resources
your facility has put into its accident prevention program.

Your executive summary can not be claimed as CBI. Do not include any CBI data in your executive
summary.

If your executive summary is short, it can be "cut" from the word processing program you are using and
"pasted" into the text box on the Executive Summary screen.  Alternatively, you may type the executive
summary straight into the text box. To expand the visual size of the text box, press  [shift-F2].

In order for RMP*Submit to be able to operate on a very low end computer (386, Windows 3.x), very long
executive summaries (those over about 10 pages  long) can not be cut and pasted into the text box on the
Executive Summary screen. To report long executive summaries, you have 2 options:

       1) Attach your entire executive summary in a separate ASCII file: While you are using your
       word processing program, save the executive summary as an ASCII Text file (most word
       processing program allow you to do this).  Then, in RMP*Submit's Executive Summary screen,
       click on the box with the 3 dots (...) at the bottom of the screen to "browse" your system and locate
       the ASCII Text file. Select the ASCII Text file containing your executive summary, and
       RMP*Submit will store that filename. When you are ready to submit your RMP, choose "Submit"
       from the "List of Risk Management Plans" screen, and the executive summary file will be
       automatically stored on the submirtal disk along with the rest of the RMP.

       2) Cut and paste part of the executive summary and attach the rest: Enter part of your
       executive summary into the text box on the Executive Summary page in RMP* Submit by either
       cutting and pasting text or typing it in. Then, attach the rest of the executive summary in a
       separate ASCII Text file using the instructions in #1 above.

The Executive Summary must briefly describe the following elements:

The accidental release prevention and emergency response policies at your facility
Describe your facility's overall approach to chemical safety.  You may want to include any corporate
policies (if applicable) and an overview of senior management commitment to safety and implementation of
safe procedures.

Your facility and the regulated substances handled
Provide a description of your facility so that the public has a clear picture of the facility, its processes, and
products. Describe the primary activities at the facility (e.g., manufacturer of polyethylene, pulp mill, etc.)
and the regulated substances used. In addition, you may want to mention the quantities of these substances
handled or stored at your facility.
RMP* Submit User Manual February 1999                                                   Ch. 2 Pg. 1

-------
The worst-case release scenario(s) and the alternative release scenario(s)
Describe each of your release scenarios and indicate whether the release has offsite impact, if applicable.
You may want to indicate whether you used the OCA Guidance, an industry-specific guidance, or
conducted your own modeling.

For the worst-case, if your analysis considers administrative controls that limit the quantity released to
below the maximum capacity of the largest vessel, you must identify both the amount of the reduction and
the control mechanisms (e.g., "Written operating procedures and high-level alarms prevent more than 6,000
gallons from being present in the  10,000 gallon tank."). In addition, if you considered passive  mitigation
measures in your analysis, you must identify both the mitigation systems in use and their effect (e.g., "A
concrete  dike around the tank limits the exposed surface area of a pool and thus reduces the release rate to
X.").  You may also want to discuss any systems or procedures you have that make a worst-case release
unlikely.

For the alternative scenarios, if you considered either active or passive mitigation measures in your
analysis,  you must identify both the mitigation systems in use and their effect (e.g., "An automatic water
spray is expected to knock down approximately 50 percent of the vapor released from the end of the
delivery pipeline."). You may also want to discuss why you selected the particular scenario.

The general accidental release prevention program and chemical-specific prevention steps
You may wish to mention the rules and regulations with which your facility complies, such as the OSFIA
PSM  rule. You should also highlight practices that you believe are important to your prevention program.
The steps you list may be either technological (e.g., backup systems) or procedural/managerial (e.g.,
improved maintenance or training).

The five-year accident history
Do not present accident history information in table form here; more details will be provided in the data
elements. This should be a written summary; for example, "We have had five accidental releases of
chlorine in the past five years; the largest release was 1,500 pounds. No one offsite was injured, but
several houses were evacuated as a precautionary measure during the October 1995 and May 1996
releases."

The emergency response program
Briefly describe the elements of your response program such as coordination with local emergency
responders, training received by personnel, drills conducted by your facility, public notification and  alert
systems,  as appropriate.

Planned changes to improve safety
List any upcoming events such as training, installation of new mitigation or control equipment or
technology, organizational changes, etc., that will improve safety at your facility.
RMP* Submit User Manual February 1999                                                    Ch. 2 Pg. 2

-------
SECTION 1:  REGISTRATION
If you are covered by the Risk Management Program rule, you must complete the registration portion of the
RMP even if you have only Program 1 processes. The registration consists of facility identification
information like that you provide under the Emergency Planning and Community Right to Know Act
(EPCRA) Tier I or II reports and Toxic Release Inventory (TRI) Form R reports.

l.l.a. Facility Name.  Provide the name of your facility. The name must be specific to the site; if the site
is part of a large corporation, the name may be the corporate name plus the location (for example ABC
Chemicals - Hightown Plant).

l.l.b. Parent Company #1 Name. Your parent company is the corporation or other business entity that
owns at least 50 percent of the voting stock of your company. If you are owned by a joint venture, enter
the first of your two  major owners here. If your company does not have  a parent company, leave this data
element blank.

l.l.c. Parent Company #2 Name. If you are owned by a joint venture, enter the name of the second major
owner here.

1.2 EPA  Facility Identifier.  EPA is working toward streamlining facility reporting by creating a new
EPA Facility ID for  all facilities that report to EPA that would be used across all of EPA's program
systems.  Each facility will be assigned a unique, 12 character, identifier called the "EPA  Facility ID"; this
number will  not be any of the ID numbers that you may already have.  The RMP program is the first to
adopt this ID for use by reporting facilities. The EPA Facility ID must be left blank for first-time
submissions  in June  of 1999, and will be assigned to you after your first submission.  It will be needed for
all subsequent submissions and  administrative changes. EPA will notify the facility after its first
submission of its new EPA Facility ID number.

1.3. Other EPA Systems Facility Identifier. In EPA's efforts to streamline facility reporting, incoming
facility information needs to be linked with existing facility information across different environmental
programs. To help ensure your facility's RMP data is properly linked and that your facility does not
receive multiple EPA Facility IDs, please enter one of the following Facility Identification numbers in the
following priority order:

First, if you have a TRI (Toxic Release Inventory) ID number (15 characters), enter it here. If you know
you have a TRI ID, but do not know what it is, you can find it by  doing a search of the TRI database on the
Internet at: http://www.epa.gov/enviro/html/tris/tris_query_java.html or calling the EPCRA Hotline at
800-535-0202.

Second, if you do not have a TRI ID, but report to EPA under another program and have  a number referred
to as a "FINDS" or Unique Identification Number (UIN), (these will be 12 characters), enter it here. If you
know you have a "FINDS" or "UIN" number, but do not know what it is, you can find it by doing a search
of EPA's  Facility Identification Initiative (FII) database on the Internet at:
http://www.epa.gov/enviro/html/fii/fii_query.html

Third, use any one of the following numbers:
If your facility is covered by hazardous waste regulations under the Resource Conservation and Recovery
Act (RCRA), enter your RCRIS Handler ID (12 characters). You can find your RCRIS ID  on the Internet
at: http://www.epa.gov/enviro/html/rcris/rcris_queryjava.html.

RMP* Submit User Manual February 1999                                                   Ch. 2 Pg. 3

-------
If your facility is covered by regulations under the Comprehensive Environmental Response,
Compensation, and Liability Act (CERCLA), enter your CERCLIS Site ID (7 characters). You can find
your CERCLIS ID on the Internet at: http://www.epa.gov/enviro/html/cerclis/cerclis_query.html.

If your facility does not have an ID Number as described above, leave this data element blank.

1.4.a. Facility Dun and Bradstreet Number (DUNS).  A Dun and Bradstreet Number (DUNS) is a nine-
digit identification number that allows your facility to be cross-referenced to various business information.
If you have a DUNS number, it should be available from your treasurer or financial officer. You can also
obtain the number from your local Dun and Bradstreet office (check the telephone book White Pages). If
you don't have a DUNS number, leave this data element blank.

1.4.b-c. Parent Company Dun & Bradstreet Number(s) (DUNS). Enter the DUNS number of your
parent company(ies), if applicable. If you are owned by a j oint venture, enter the numbers for your two
major owners. If you do not have a parent company or your parent company does not have a DUNS
number, leave this item blank.

1.5.a-e. Facility Location Address.  Enter your facility location address, including the street, city, state,
and zip code (including the 4 digit extension, if applicable) of your facility.  This is the location where
regulated substances are present.  The city  should be the local legal jurisdiction, for example, a township or
village. Use local street and road designations, not post office or rural box numbers.  This location may
not represent the mailing address. EPA will not attempt to mail correspondence to this address. All
correspondence will be mailed to the address provided at 1.6.c-h. If your location and mailing address are
the same, then you will fill in the same  address at 1.6.c-h.

l.S.f. Facility County.  Enter the county in which the facility is located.

1.5.g-h. Facility Latitude and Longitude. Enter the latitudinal and longitudinal coordinates of your
facility in "degrees, minutes, and seconds." Enter both latitude and longitude to the nearest second (at
least). Instructions on how to determine these coordinates can be found in Appendix F.

Enter only numerical data.  Do not preface numbers with letters such as N or W to denote the hemisphere.
For RMP* Submit, the default for the hemisphere is "+" for east and north. However because "+" is
assumed by the system, you must leave that space blank for east and north.  For west and south, enter a
negative,"-," as the first character. Enter both latitude and longitude to the nearest second.

Be careful not to reverse your latitude and longitude coordinates. Latitude in the 48 contiguous states
ranges from  25° to 49°, while longitude ranges from 72° to 124°.

The following table illustrates the acceptable response for a particular latitude and longitude value.

Boston
Chicago
Oakland
Honolulu
Latitude
42° 17' 55"
41° 53' 49"
37° 47' 50"
21° 18' 00"
Longitude
- 71° 06' 03"
- 87° 42' 11"
- 122° 18' 08"
- 157° 54' 00"
RMP* Submit User Manual February 1999
Ch. 2 Pg. 4

-------
It is important to provide accurate latitude and longitude values in your RMP. RMP*Submit will help you
by letting you know if the value that you enter falls outside of the range of values for the county in which
your facility is located.

l.S.i. Method for determining Latitude and Longitude. You also must indicate the method that you
used to determine your latitude and longitude data. The table below lists the codes to be used for this
element and provides a brief description of each method.

The most common methods for determining Latitude and Longitude are II (Interpolation-Map), and 14
(Interpolation-Digital Map Source). Use II if you obtained your latitude and longitude from a paper map.
Use 14 if you obtained your latitude and longitude from a computer-based geographic information system
(GIS), such as LandView.

Code   Description of Method
Al      Address Matching -House Number: derived from a point corresponding to a house or building number
        along a street segment.
A2      Address Matching - Block Face: derived from a calculated midpoint of one side of a street segment with
        regard to odd or even addresses.
A3      Address Matching - Street Centerline: derived from a calculated midpoint and centerpoint of a street
        segment.
A4      Address Matching - Nearest Intersection: derived from the intersection closest to a house or building
        number.
A5      Address Matching - Primary Name: derived from the primary name of a township or city.
A6      Address Matching - Digitized: derived from hands-on use of computer-based mapping tools.
AO     Address Matching - Other: derived through the use of non-specific matching techniques.

Cl      Census Block - 1990 - Centroid: derived from the calculated centerpoint of a 1990 Census Block as
        defined by the U.S. Bureau of the Census
C2      Census Block/Group - 1990 - Centroid: derived from the calculated centerpoint of a 1990 Census
        Block/Group as defined by the U.S. Bureau of the Census
C3      Census Block Tract - 1990 - Centroid: derived from the calculated centerpoint of a 1990 Census Tract as
        defined by the U.S. Bureau of the Census.
CO     Census - Other: derived from other Census-defined areas, such as Metropolitan Statistical Areas (MSAs).
Gl      Global Positioning System (GPS) Carrier Phase Static Relative Positioning Technique: derived through
        the use of a GPS device employing Carrier Static Relative Positioning Technique.
G2      GPS Carrier Phase Kinematic Relative Positioning Technique: derived through the use of a GPS device
        employing Phase Kinematic Relative Positioning Technique.
G3      GPS Code Measurements (Pseudo Range) Differentially Corrected: derived through the use of a GPS
        device where measurements have been corrected for error based on the existence of known base stations
        relative to the  study area.
G4      GPS Code Measurements (Pseudo Range) Precise Positioning Service: derived through the use of a GPS
        device employing real-time precise positioning techniques.
G5      GPS Code Measurements (Pseudo  Range) Standard Positioning Service SA OFF: derived through the use
        of a GPS device when the Department of Defense Selective Ability was turned off.
G6      GPS Code Measurements (Pseudo  Range) Standard Positioning Service SA ON:  derived through the use
        of a GPS device when the Department of Defense Selective Ability was turned on.
G7      GPS Code Measurements (Pseudo  Range) Standard Positioning Service Corrected using Canadian Active
        Control System: derived through the use of a GPS device employing the Canadian Active Control System.
GO     GPS-Other/ Unspecified: derived through the use of an unspecified GPS device.
II       Interpolation - Map: derived from a paper or other non-digital map
12       Interpolation - Photo: derived from an aerial photograph
13       Interpolation - Satellite: derived from a satellite image.

RMP* Submit User Manual February 1999                                                      Ch. 2 Pg.  5

-------
14      Interpolation - Digital map source (TIGER):  derived from a digital map, mapping software or mapping
        tool.
15      Interpolation - SPOT: derived from a SPOT image.
16      Interpolation - MSS (Multi-spectral Scanner): derived from a MSS image
17      Interpolation - TM (Thematic Mapper): derived from a thematic mapper
IO      Interpolation - Other
LI      LoranC: derived from the use of a Loran-C positioning device
PI      Public Land Survey-Section: a coordinate pair corresponding to a point from a public land survey.
P2      Public Land Survey-Quarter Section: a coordinate pair corresponding to a point from a public land survey
P3      Public Land Survey-Eighth Section: a coordinate pair corresponding to a point from a public land survey.
P4      Public Land Survey-Sixteenth Section: a coordinate pair corresponding to a point from a public land
        survey.
P5      Public Land Survey-Footing: a coordinate pair corresponding to a point from a public land survey.
SI      Classical Surveying Techniques: derived from traditional surveying techniques associated with
        construction activities.
Zl      ZIP Code-Centroid: derived from the calculated center of a U.S. postal ZIP code.
Z2      ZIP+2 Code-Centroid: derived from an averaging of multiple street segments.  Approximately the size of
        a Census Block Group.
Z4      ZIP+4 Code-Centroid: derived from a calculated midpoint of one side of a street segment with regard to
        odd or even house or building numbers.
OT     Other
UN     Unknown

l.S.j. Description of location identified by Latitude and Longitude.  You must also describe the exact location
your latitude and longitude values represent. The table below lists the codes to be used for this element.

The most common Latitude and Longitude location descriptions are  PG (Plant Entrance - General) and CE (Center
of Facility).

Code   Description of Location
AB     Administrative Building: a building, structure, or portion thereof that houses the administrative functions
        of a facility as opposed to production or manufacturing activities.
AE     Atmospheric Emissions Treatment Unit: equipment installed for the  express purpose of treating chemical
        emissions prior to their release into the atmosphere.
AM     Air Monitoring Station: equipment installed at a predetermined location for the automatic, manual, or
        periodic collection of environmental air samples.
AS     Air Release Stack: a free-standing vertical structure  constructed for the conveyance and release of
        chemical emissions into the air.
AV     Air Release Vent: a horizontal structure constructed for the  release of chemical emissions into the air,
        typically from the side or roof of a building.
CE     Center of Facility: a representative center point within the boundary of a facility.
FC     Facility  Centroid: the calculated center of a contiguous facility.
IP      Intake Pipe: a pipe or intake opening constructed for the collection and conveyance of water.
LC     Loading Area Centroid: the calculated center of a portion of a facility associated with loading activities.
LF      Loading Facility: the portion of a facility associated with loading and/or transshipment activities.
LW     Liquid Waste Treatment Unit: Equipment installed for the express purpose of treating chemical emissions
        prior to their release to water, publicly owned treatment works (POTW)  or off-site transfer.
NE     NE Corner of Land Parcel: the northeast most corner or boundary of a land parcel.
NW     NW Corner of Land Parcel: the northwest most corner or boundary of a land parcel.
OT     Other: see descriptive comment field.
PC     Process  Unit Area Centroid: the calculated center of a portion  of a facility associated with processing
        and/or manufacturing activities.
PF      Plant Entrance (Freight): the entrance to a facility associated with transshipment activities.


RMP* Submit User Manual February 1999                                                        Ch. 2 Pg. 6

-------
PG     Plant Entrance (General): the front gate or general entrance of a facility.
PP      Plant Entrance (Personnel): the entrance to a facility associated with employees.
PU     Process Unit: the portion of a facility associated with processing and/or manufacturing activities.
SD     Solid Waste Treatment/Disposal Unit: the portion of a facility associated with the treatment and/or
        disposal of solid waste.
SE      SE Corner of Land Parcel: the southeast most corner or boundary of a land parcel.
SP      Lagoon or Settling Pond: the portion of a facility designed to accommodate sedimentation or settling of
        chemical by-products necessitated by the manufacture, production, or use of chemicals.
SS      Solid Waste Storage Area: the portion of a facility associated with the storage of solid waste.
ST      Storage Tank: a receptacle or chamber used for storing bulk fuels or chemicals.
SW     SW Corner of Land Parcel: the southwest most corner or boundary of a land parcel.
WA     Wellhead Protection Area: an area at the earth's surface buffering a wellhead.
WL     Well:  a shaft drilled in the earth for purposes such as obtaining subsurface drinking water, or collecting
        groundwater monitoring samples.
WM    Water Monitoring Station: a location or study area for the automatic, manual, or periodic collection of
        water samples.
WR     Pipe Release to Water: the point at which a pipe constructed for the conveyance and release of water-borne
        chemical emissions reaches a water body.
UN     Unknown

1.6.a. Owner or Operator Name.  Enter the name of the legal owner or operator of the facility (person,
company, association, or government agency).

1.6.b. Owner or Operator Phone.  Enter the owner or operator's business phone number, including area
code.

1.6.c-h. Owner or Operator Mailing Address.  Enter the owner or operator's business mailing address,
including street or P.O. or rural box, city, state, and zip code (including 4 digit extension, if applicable).
The city should be the local legal jurisdiction, for example, a township or  village.  In this instance, you
should use post office and rural box numbers, if appropriate. This is the address that all correspondence
will be mailed to.

1.7.a. Name of person responsible for RMP (part 68) implementation
1.7.b. Title of person or position responsible for RMP (part 68) implementation
Enter the name and title of the person  or position with overall responsibility for the risk management
program at your site. Although the individual's name is not required, the title of the person or the position
that has this responsibility is required.

1.8. Emergency Contact.
1.8.a-b. Name and Title.  Enter the name and title or job classification of the person designated as the
emergency contact. If you have a toxic regulated substance, you already may have designated a facility
emergency coordinator in your notification to your Local Emergency Planning Committee (LEPC) under
EPCRA section 312. If you have more than one contact person, provide just one name for this entry. You
may want to list the others in your Executive Summary.
RMP* Submit User Manual February 1999                                                      Ch. 2 Pg. 7

-------
      Your emergency contact should be:
      4- An employee or contract employee of your facility;
      4- Knowledgeable about your site;
      4- Aware of all emergency plans; and
      4- Able to provide emergency response support or direct response personnel to provide support.
l.S.c. Phone Number. Enter the phone number, including area code, where the emergency contact can be
reached during normal business hours.  You most likely will enter the facility phone number here. If your
facility does not have a phone number,  you may enter the business phone number of the emergency contact,
the phone number of a dispatcher, or the customer service phone number.

1.8.d-e. 24-Hour Phone Number & Extension or Pin Number. Enter the phone number, including area
code, where the emergency contact can be reached during non-working hours.  You most likely will enter
the emergency contact's 24-hour "beeper" number.  There is a space for an extension or pin number, if
applicable.

1.9.a. Facility or Parent Company E-Mail Address (Optional). You may choose to provide an e-mail
address to which inquiries from the public could be sent. The e-mail address could be for the person who
developed your RMP or your public liaison office.

1.9.b. Facility Public Contact  Phone Number (Optional). You may choose to provide a phone number
for public inquiries.  It could be the phone number of the person who developed your RMP or of your
public liaison office.

1.9.c. Facility or Parent Company WWW Homepage Address (Optional). You may choose to provide
an Internet address where the public can obtain more details on your accident prevention program, offsite
consequence analysis, or other  facility or corporate information. In  RMP*Info, your homepage address
will be hot-linked to your homepage, meaning a user can just click on this data element and automatically
go to your homepage.

1.10. LEPC (Optional). Enter the name of your Local Emergency Planning Committee (LEPC) for your
planning  district. LEPCs were  created to do local planning under the Emergency Planning  and Community
Right to Know Act (EPCRA) of 1986.  In RMP*Submit, you will select your LEPC's name from a pick list
based on the facility county and zip code information that you have provided.  If you do not know your
LEPC's name, you can call your local fire department or refer to the LEPC Database on the Internet at
http://www.rtk.net/www/data/lepc.html. This data element will help your LEPC find the facilities in its
jurisdiction when searching in RMP*Info.

1.11. Number of full-time employees on site. Enter the number of full-time  equivalent employees who
work at your facility. To determine the number of full-time equivalent employees at your facility, add
together the fractions of full-time work performed by part-time or seasonal employees and round to the
nearest whole number (see example below).  Do not include contract employees. If your facility is un-
manned or is only staffed by part-time employees, you should briefly explain these circumstances in the
executive summary.
RMP* Submit User Manual February 1999                                                   Ch. 2 Pg. 8

-------
For example, suppose a facility has 10 regular full-time employees, two part-time employees that each
work 30 hours per week, and seven seasonal employees that each work 40 hours per week for three months
of the year. You should count the two part-time employees as 3/4 of an employee each because they work
3/4 that of a full-time employee and the seven seasonal employees as a 1/4 of a full-time employee each, for
the same reason.  As shown in the table below you get 13.25,  which you should round to the nearest whole
number. You should enter "13" for the number of full-time employees.

                                         EXAMPLE 4
Type of Employee
Full-time (40 Hours)
Part-Time (30 hours)
Seasonal (3 months/year)
Total
Number of Employees Times the
Fraction of a Full-Time Employee
10x1
2x0.75
7x0.25

Full- Time Equivalent
Employees
10
1.5
1.75
13.25 (rounded to 13)
1.12.a. Covered by OSFIA's Process Safety Management (PSM) Standard. This data element applies
to your facility as a whole and is not a process-by-process determination.  Therefore, if one process at your
facility is subject to the OSFiA PSM standard, select this data element, even if the PSM process is not
covered by this rule.

1.12.b. Covered by EPCRA section 302. If you have on site more than a threshold quantity of a
substance that is an extremely hazardous substance (EHS), you are subject to EPCRA §302 notification
requirements (a one time notification to the State Emergency Response Commission (SERC) and LEPC
that you have one of the listed EHSs on site). If you are subject to those requirements, check this element,
regardless of whether the EHS is an RMP regulated substance or is held in a process below the 112(r)
threshold quantity.  Two quick hints:

(1)      If you are subject to the RMP rule because you have more than a threshold quantity of a toxic
        substance listed under Section 112(r), you are subject to EPCRA section 302 and must select this
        data element.
(2)      If you are subject to the RMP rule only as a result of flammable substances, you are not subject to
        EPCRA section 302, and you can leave this data element blank.

1.12.C. CAA Title V Air Operating Permit ID.  Title V of the Clean Air Act requires major sources of
air pollution to obtain permits. If your facility has been issued a Title V operating permit by a federal,
state, or local permitting agency, check this element and enter your permit number.

1.13. OSFIA Star or Merit Ranking (Optional). Check the box if your facility has received a Star or
Merit Ranking under OSHA's Voluntary Protection Program and thus is exempt from audits conducted
pursuant to § 68.220(b)(2) and (7).

1.14. Last Safety Inspection (by an External Agency) Date
1.15. Last Safety Inspection Performed by an External Agency (select one )
Record the date of your last safety inspection by an external agency here and select the agency (or
agencies) that performed the inspection.  Choose from the following:  OSHA; State occupational safety
RMP* Submit User Manual February 1999
Ch. 2 Pg. 9

-------
organization; EPA; State environmental agency; fire department; or "Never had one." RMP*Submit will
also let you enter your own answer.  If your last safety inspection was a joint inspection, enter multiple
agencies by typing them into the field.

1.16. Will this RMP involve Predictive Filing?
Predictive Filing is an RMP filing option that allows your facility to submit an RMP which includes
regulated substances which may not actually be present at the facility at the time the RMP is submitted.
This option is intended to assist facilities such as chemical warehouses, chemical distributors, batch
processors and the like  whose operations involve highly variable types  and quantities of regulated
substances but who are able to forecast their inventory with some degree of accuracy. Under 40 CFR
§68.190, a facility is required to update and re-submit its RMP no later than the date  on which a new
regulated substance is first present in a covered process above a threshold quantity. By using Predictive
Filing, you will not be required to update and re-submit your RMP when you receive a new regulated
substance if that substance was included in your latest RMP submission (as long as you receive it in a
quantity that does not trigger a revised offsite consequence analysis as  provided in 40 CFR §68.36).

If you use Predictive Filing, you should  implement your Risk Management Program and prepare your RMP
in exactly the same way as if all of the substances included in the RMP were actually present. This means
that you must meet all rule requirements for each regulated substance for which you file, whether or not
that substance is actually present on site at the time you submit your RMP. Depending on the substances
for  which you file, this  may require you to perform additional worst-case and alternative-case scenarios and
to implement additional prevention program elements. Note that if your facility uses this option you must
still update and resubmit your RMP if you receive a new regulated substance which was not included in
your latest RMP. Your facility must also continue to comply with the other update requirements stated in
40 CFR §68.190.

If your facility uses Predictive Filing, the RMP* Info data for your facility on the Internet will indicate that
your facility has filed a predictive RMP.  This will inform the user that some of the chemicals in your RMP
may not actually be present on site, but will not indicate which specific chemicals are on site at any given
time.  Therefore, you may receive more  frequent questions from the public, local officials, or implementing
agencies about your actual chemical inventory.  EPA encourages you to engage in more frequent dialogue
with these parties, and in particular with local emergency planners, emergency responders, and community
officials to update them on your current inventory of regulated substances.

1.17. Process-Specific  Information

In this section of the registration, answer five questions for EACH covered process at your facility. A few
examples follow the descriptions  of the data elements below.
Process ID #. This field is provided to help you (if you need to) track multiple processes as you fill out the
remaining sections of your RMP. In RMP*Submit, this number is automatically generated.

Process Description. This description is optional. It is provided to help you (if you need to) track
multiple processes as you fill out the remaining sections of your RMP.
RMP*Submit User Manual February 1999                                                   Ch. 2 Pg. 10

-------
1.17.a. Program Level.  The rule imposes different requirements on processes based on the potential for
public impacts and the level of effort needed to prevent accidents. EPA has set three levels of requirements
that apply to covered processes:

 Program Eligibility Criteria	
 Program 1
Program 2
Program 3 (unless eligible for
Program 1)
 No offsite accident history,

  No public receptors in
  worst-case circle, and

 Emergency response coordinated
 with local responders.
The process is not eligible for
Program 1 or subject to
Program 3.
Process is subject to OSHA PSM,
or

Process is in NAICS code 32211,
32411,32511,325181,325188,
325192, 325199, 325211, 325311,
or 32532.
If you can qualify a process for Program 1, it is in your best interests to do so, even if the process is
already subject to OSHA PSM. For Program 1 processes, the implementing agency will inspect and
enforce only on compliance with the minimal Program 1 requirements.  If you assign a process to Program
2 or 3 when it might qualify for Program 1, the implementing agency will inspect or enforce for compliance
with all the requirements of the higher program levels. If, however, you are already in compliance with the
prevention elements  of Program 2 or Program 3, you may want to use the RMP to inform the community of
your prevention efforts.

KEY POINTS TO  REMEMBER

       In determining program levels for your process(es), keep in mind the following:

       (1)    The program levels apply to individual processes and generally indicate the risk
              management measures necessary to comply with this regulation for the process, not the
              facility as a whole.  The eligibility of one process for a program level does not influence
              the eligibility of other covered processes for other program levels.

       (2)    Any process can be eligible for Program 1, even if it is subject to OSHA PSM or is in
              one  of the NAICS codes subject to Program 3.

       (3)    Program 2 is the default program level.  There are no "standard criteria"  for Program 2.
              Any process  that does not meet the eligibility criteria for either Programs 1 or 3 is subject
              to the requirements  for Program 2.

Refer to Chapter  2 of the General Guidance for Risk Management Programs for more information on
determining the Program levels of your processes.  Once you determine the Program level, simply enter 1,
2, or 3 for this data element.

l.lT.b. NAICS Code(s).  The North American Industry Classification  System (NAICS) categorizes
businesses by fitting them into descriptive categories that correspond to five-digit or six-digit codes.
NAICS codes have replaced SIC codes, which you may be familiar with.  For example, pulp mills are
NAICS code 32211, paper mills  are 322121 or 322122, and metal platers are  332813. The first three
RMP* Submit User Manual February 1999
                                                    Ch. 2Pg. 11

-------
digits of a five or six-digit code define a major business sector and the last two or three digits indicate an
establishment's specialty within the major sector.

For this data element you should provide the NAICS code that most closely corresponds to the process; it
will not necessarily be the same NAICS code for you facility as a whole. For example, if you manufacture
chlorine, then process it to make cleaners, the chlorine manufacturing is in NAICS code 325818 and the
cleaner manufacturing is in NAICS code 325612.  If your chlorine manufacturing vessel is connected by
pipes to, or co-located with, the cleaner manufacturing vessel, they are considered one "process" by the
RMP rule.  In such a case, you should enter the NAICS code that describes the primary activity of the
"process." In the example above, if the chlorine and cleaner vessels  are interconnected, the primary activity
of the "process" is manufacturing cleaner, since that is the ultimate product of the "process."  You may also
enter additional NAICS codes if you wish to identify other aspects of a process not captured by the NAICS
codes for the primary activity. In the example above, you could also enter NAICS code 325181 for
chlorine manufacturing, if you so desire.  If you do enter multiple NAICS codes, be sure to enter your
primary NAICS code first.

You should determine the NAICS codes for your processes based on your activities on site using the 1997
North American Industry Classification System Manual. Appendix B of the General Guidance for Risk
Management Programs provides the NAICS codes for the industry sectors most likely to be subject to 40
CFR Part 68. RMP* Submit also contains the full list. You may also access the  full list online at
www.census.gov/epcd/www/naics.html and a cross-walk between SIC codes and NAICS codes at
http://www. census.gov/epcd/www/naicstab. htm.

To simplify your search, a list of the three-digit NAICS codes is presented in Appendix J.

Below is the conversion from SIC codes to NAICS codes for the Program 3 NAICS codes. Note there are
2 duplicates listed in the NAICS column because of the conversion.  The 9 SIC codes translate into a total
of 10 SIC codes.

SIC	NAICS	Sector	
2812          325181        Alkalies and chlorine
2821          325211        Plastics and resins
2873          325311        Nitrogen fertilizer
2879          32532         Pesticide and other agricultural chemicals
2911          32411         Petroleum refineries
2611          32211         Pulp mills only
2819          325188        All other basic inorganic chemical manufacturing
2865          32511         Aromatics have been combined with aliphatics from 2869 to form the new
                             petrochemical manufacturing
               325192        Other covers the  cyclic crude and intermediate manufacturing
2869          32511         Aliphatics, joined with aromatics in petrochemical manufacturing;
               325188        Carbon bisulfide, moved to "All other basic inorganic chemical
                             manufacturing" (covered from old 2819);
               325199        Other, moved to  "All other basic organic chemical manufacturing."
RMP*Submit User Manual February 1999                                                  Ch. 2 Pg. 12

-------
1.17.C.1. Chemical Name.  For each covered process, provide the names of all regulated substances held
above the threshold.  Many regulated substances have synonyms; however, you must enter the name of the
regulated substance as it appears in § 68.130.  If you have aNFPA-4 flammable mixture containing
regulated flammables, you may list it as a "flammable mixture." List all of the regulated substances
contained in the mixture; however, only report the quantity of the entire mixture, not the individual
substances.  RMP* Submit contains a pick list of all regulated substances.

1.17.C.2. CAS Number.  Provide the Chemical Abstracts Service (CAS) registry number for each
corresponding chemical name in 1.17.C.1 above. CAS numbers are listed in 40 CFR § 68.130 and in
EPA's General Guidance for Risk Management Programs .  RMP*Submit will automatically generate the
CAS # based on the chemical name chosen. Because there is no CAS # for flammable mixtures, leave this
field blank.  RMP* Submit will assign a "dummy" CAS number of all zeros for flammable mixtures.

1.17.C.3. Quantity. For each chemical reported in 1.17.C.1, estimate the maximum quantity (in pounds)
held in the covered process at any one time during the calendar year to two significant digits.  For example:
        5,333 pounds           should be reported as...  5,300 pounds
        107,899 pounds         should be reported as...   110,000 pounds
        128,000 pounds         should be reported as...   130,000 pounds
 Can I use Maximum Quantity On-Site Data from my EPCRA Tier II Reports?

 Not directly. EPCRA Tier II reports require maximum quantity on-site in specified ranges. The RMP
 registration asks for the maximum quantity in a process. Therefore, if your facility has several covered
 processes containing the same regulated substance above the threshold, estimate on a process-by-process basis
 the maximum quantity of the regulated substance in each process.

 You may be able to use raw Tier II data to estimate the quantity of a regulated substance in a process.  It is
 likely that in preparing your Tier II reports you estimated the quantity of a regulated substance in each process
 or building  and then added the quantities together to estimate the total maximum on-site. Therefore, you can
 take the estimates you used to calculate your Tier II ranges for your RMP registration.

 How do I Report Maximum Quantity in a Process for Mixtures or Trade Name Products?

 Toxics.  If the regulated toxic substance present in a process is part of a mixture or trade name product,
 determine the maximum quantity of the mixture or trade name product and then calculate the weight percent of
 the regulated toxic substance to report for quantity. Do not include the weight of the entire mixture or trade
 name product.

 Flammables. If the regulated flammable substance is part of the mixture and the mixture meets the criteria of
 NFPA-4, report the weight of the mixture.
RMP* Submit User Manual February 1999                                                    Ch. 2 Pg. 13

-------
                                         EXAMPLE 2
Suppose you have 21,365 pounds of ammonia in a covered process classified as other basic inorganic
chemicals (NAICS code 32518) and do not have ammonia in any other covered processes.  Report your
ammonia maximum as:
Process Number:
Process Description:
1.17.a. Program Level:
1.17.b. NAICS Code(s):
1.17.C. Chemical
1
Basic Inorganic Chemicals
2
32518
1.17.C.1. Name: 1.17.C.2. CAS #: 1.17.C.3. Quantity (Ibs.):
Ammonia 7664-41-7 21,000
Now suppose that in addition to the 21,365 pounds, you also have 25,600 pounds of ammonia in another
covered process classified as nitrogenous fertilizers (NAICS code 325311). In this case, report a second
process as:
Process Number:
Process Description:
1.17.a. Program Level:
1.17.b. NAICS Code(s):
1.17.C. Chemical
2
Nitrogenous fertilizer
2
325311
1.17.C.1. Name: 1.17.C.2. CAS #: 1.17.C.3. Quantity (Ibs.):
Ammonia 7664-41-7 26,000
RMP* Submit User Manual February 1999
Ch. 2 Pg. 14

-------
                                          EXAMPLE 3
You received one shipment of a nitric acid solution last year that filled your 5,000-gallon storage tank.
You know that the solution contains 95% nitric acid, which is a regulated chemical with a threshold
quantity of 5,000 pounds.

First, convert gallons to pounds:
The density of 95% nitric acid is about 12 pounds per gallon, so you calculate the total weight of solution
by multiplying 5,000 gallons by 12 to get 60,000 pounds.

Then, calculate the portion of the solution attributable to the regulated toxic substance:
To calculate the weight of nitric acid, you multiply 60,000 pounds by 0.95 to get 57,000 pounds.

Report the nitric  acid in this process as follows:
Process Number:
Process Description:
1.17.a. Program Level:
1.17.b. NAICS Code(s):
1.17.C. Chemical
o
J
Storage - nitric acid
2
325311
1.17.C.1. Name: 1.17.C.2. CAS #: 1.17.C.3. Quantity (Ibs.):
Nitric Acid 7697-37-2 57,000
RMP* Submit User Manual February 1999
Ch. 2 Pg. 15

-------
E.      OVERVIEW OF THE RMP SECTIONS ON
        OFFSITE CONSEQUENCE ANALYSIS (OCA) (SECTIONS 2-5)

You must submit data on:

1.       A worst-case release scenario analysis for all covered processes as follows:

        Report one worst-case release scenario for each Program 1 process. Program 1 processes must
        have no public receptors within the distance to the endpoint in the worst-case analysis.

        If your facility has Program 2 or Program 3 processes, provide information on one worst-case
        release scenario representing all toxic regulated substances present above the threshold quantity,
        and one worst-case release scenario representing all flammable regulated substances present above
        the threshold quantity. You may also need to submit an additional worst-case scenario for either
        hazard class (i.e., toxic or flammable), if a worst-case release from elsewhere  at your facility
        would potentially affect a different set of public receptors than those affected by your initial worst-
        case scenario(s).

2.       An alternative release scenario, for Program 2 and Program 3 processes as follows:

        Alternative release scenarios should be those that will reach an endpoint offsite, unless no such
        scenario exists.

        Present one alternative release scenario for each regulated toxic substance held above the threshold
        quantity, including the substance considered in the worst-case analysis.

        Present one alternative release scenario to represent^// flammable substances  held above the
        threshold quantity.

You may include one graphic (map or diagram) in electronic format for each release scenario that you
report, but it is not required.

Using a flammable mixture for your OCA: You may have registered a flammable mixture  for a process,
even if the entire flammable mixture does not ever occur together in one vessel in the process. When
reporting the OCA, choose the flammable mixture from the registration section, but do the modeling based
on the specific components of the flammable mixture that are contained in the vessel that you are modeling
for the OCA.

Refer to Chapter 4 of the General Guidance for Risk Management Programs for more details on the
requirements of the Offsite Consequence Analysis.
RMP*Submit User Manual February 1999                                                   Ch. 2 Pg. 16

-------
SECTION 2   TOXICS: WORST-CASE
Complete this section for each toxic worst-case scenario you report.

2.1.a. Chemical name. Enter the name of the regulated toxic chemical you evaluated in the worst-case
scenario.

2.1.b. Percent weight  of chemical (if in a mixture). If your worst-case scenario involves the release of a
mixture containing a regulated substance, enter the percentage weight of the regulated substance in the
mixture. Leave blank  if it is not a mixture.

2.2. Physical state.  Select the physical state of the chemical in the vessel that you are modeling.
        a. Gas.
        b. Liquid.
        c. Gas liquified by pressure.
        d. Gas liquified by refrigeration.

2.3. Model used (select one). Select the source of your results for your worst-case release analysis or
enter another model name in "Other":
        a. EPA's OCA Guidance Reference Tables or Equations
        b. EPA's RMP Guidance for Ammonia Refrigeration Reference Tables or Equations
        d. EPA's RMP Guidance for Waste Water Treatment Plants Reference Tables or Equations
        e. EPA's RMP Guidance for Warehouses Reference Tables or Equations
        f EPA's RMP Guidance for Chemical Distributors Reference Tables or Equations
        g. EPA's RMP*Comp™
        h. Areal  Locations of Hazardous Atmospheres  (ALOHA®)
        z. Other model (specify)

2.4. Scenario. Select one of the following which describes your worst-case release scenario.
        a. Gas release. A release of the substance in a vapor state.
        b. Liquid spill and vaporization. A release of the substance in a liquid state with subsequent
        vaporization.

2.5. Quantity released (Ibs). Enter the quantity of toxic chemical you used for your worst-case scenario
analysis in pounds to 2 significant digits. This is the total amount that would be lost from a vessel or
pipeline, even if the release location was inside a building or into other containment.  The "release rate" or
the rate at which the chemical actually gets into the outside air for the downwind dispersion analysis, is
reported in 2.6 below.  See Chapter 2 on Determining Worst-Case Scenarios in the RMP Offsite
Consequence Analysis Guidance for more details. Here's how to report the quantity to 2 significant digits:
          5,333  pounds        should be reported as...  5,300 pounds
        107,899  pounds        should be reported as...  110,000 pounds
If you have less than 1 pound released, round up to 1 pound. You may want to clarify that in your
Executive Summary.

2.6. Release rate (Ibs/minute).  Indicate the rate of release to the outside air in pounds per minute to 1
significant digit.  For example:
         4.3 pounds            should be reported as...  4 pounds
        19 pounds             should be reported as...  20 pounds
RMP*Submit User Manual February 1999                                                   Ch. 2 Pg. 17

-------
For gases, a gas liquefied by pressurization alone, or a gas liquefied by refrigeration where the released
refrigerated liquid forms a pool of 1 cm or less in depth, the release rate should be the total quantity
released divided by 10 minutes and multiplied by the appropriate mitigation factor if a mitigated release.

The worst-case release scenario for liquid substances assumes that the liquid is instantaneously spilled on
the ground or other surface followed by volatilization into the air. For the release of a liquid or a gas
liquefied by refrigeration where the refrigerated liquid forms a pool deeper than 1 cm, the release rate to the
air should be the rate of volatilization based on the properties of the substance and size of the liquid pool
formed by the released substance, multiplied by the appropriate release mitigation factor if a mitigated
release.

2.7. Release duration (minutes). Indicate the length of time in minutes to the nearest 10 minutes for the
entire quantity released from the vessel, pipeline, or other source to be released to the outside air.

For gases, a gas liquified by pressurization alone, or a gas liquified by refrigeration where the released
refrigerated liquid forms a pool of 1 cm or less in depth, you should assume that the release duration is  10
minutes.

For a liquid or a gas liquified by refrigeration where the released refrigerated liquid forms a pool deeper
than 1  cm, the release duration should be the time required for a pool formed by the released substance to
completely vaporize.

Although in some cases it may take longer than 60 minutes for the pool to completely volatilize, most
dispersion models use the release rate and calculate the maximum downwind dispersion distance within 60
minutes;  therefore, you may enter 60 minutes for your duration even if the duration  from your modeling is
longer than 60 minutes.  You can also enter the exact duration from your modeling up to 9999 minutes.

2.8. Wind speed (meters/second).  This value has been set by EPA at 1.5 meters per second, unless you
can demonstrate that local meteorological data applicable to your facility show a higher minimum wind
speed at all times during the last three years. If you can demonstrate higher minimums existed, these
minimums may be used. Provide the wind speed in meters per second.

2.9. Atmospheric Stability Class.  This value has been set by  EPA at "F" stability class, unless you can
demonstrate that local meteorological data applicable to your facility  show a less stable atmosphere at all
times during the last three  years.  If you can demonstrate less stable conditions existed, you may use the
appropriate stability class.

2.10. Topography (select one).  Indicate whether the local topography is urban or  rural.  Urban means
that there are many obstacles in the immediate area; obstacles include buildings or trees. Rural means that
the terrain is generally flat and unobstructed in the immediate area.
RMP* Submit User Manual February 1999                                                    Ch. 2 Pg. 18

-------
2.11. Distance to endpoint (miles). Indicate the distance to the endpoint in miles to 2 significant digits,
using the endpoint specified for the chemical in 40 CFR Part 68, Appendix A.  Convert your modeling
results into miles by dividing the distance in feet by 5280 or yards by 1760. Refer to the following to
determine 2 significant digits:
            .397 miles          should be reported as...   .40 miles
          9.345 miles          should be reported as...  9.3 miles
         20.764 miles          should be reported as...  21 miles

2.12. Residential population within distance to endpoint. Estimate the population within the circle with
a center at the point of the release and  a radius determined by the distance to the endpoint to two significant
digits (e.g., 5,500 people rather than 5,483).  Population estimates include only residential populations.

2.13. Public receptors within distance to endpoint. Public receptors must be identified within the circle
with a center at the point of the release and a radius determined by the distance to the endpoint.  Public
receptor means locations where members of the public may be exposed to toxic concentrations, radiant
heat, or overpressure as a result of the release.  Public receptors include locations within the facility's
property boundary to which the public has routine and unrestricted access during or outside business hours
(e.g. a recreation field).  Locations inhabited or occupied by the public at any time without restriction by
the source (such as fences or security guards) are public receptors (see the General Guidance for Risk
Management Programs for more information on identifying public receptors).  You do not need to list
specific locations or estimate populations at these locations. The  presence of these receptors may be
determined using local street maps.  Select all that apply.
        a. Schools. Public and private elementary, secondary,  or post-secondary educational institutions
        (e.g., colleges).
        b. Residences
        c. Hospitals
        d. Prisons or Correctional facilities
        e. Recreation areas. Including stadiums, parks, and public pools.
        f. Major commercial, office,  or industrial areas. Including industrial parks, office buildings,
        shopping malls, commercial areas, and commercial farms.
        g. Other (Specify). Include any other additional information here.

2.14. Environmental receptors within distance to endpoint.  Environmental receptors must be identified
within the circle with a center at the point of the release and a radius determined by the distance to the
endpoint.  Environmental receptor means natural areas, such as national or state parks, forests, or
monuments; officially designated wildlife sanctuaries, preserves, refuges, or areas; and federal wilderness
areas, that could be exposed at any time to toxic concentrations, radiant heat, or overpressure as a result of
the release.  Environmental receptors can be identified on local  U.S. Geological Survey maps, which can be
found at many libraries.  Select all that apply.
        a. National or state parks, forests, or monuments
        b. Officially designated wildlife sanctuaries, preserves, or refuges
        c. Federal wilderness areas
        d. Other (Specify). Include any other additional information here.
RMP* Submit User Manual February 1999                                                    Ch. 2 Pg. 19

-------
2.15. Passive mitigation considered. Mitigation means specific activities, technologies, or equipment
designed or deployed to capture or control substances that have been released to minimize exposure of the
public or the environment.  Passive mitigation means equipment, devices, or technologies that function
without human, mechanical, or other energy input.  Select all passive mitigation measures that were
considered in defining the release quantity or rate to the worst-case scenario.
       a. Dikes. A low wall that acts as a barrier to prevent a spill from spreading.
       b. Enclosures. Physical containment of the release within a structure (e.g., a building).
       c. Berms.  A mound or wall of earth at the top or bottom of a slope that prevents a spill from
       spreading.
       d. Drains. A channel that carries off surface water.
       e. Sumps.  A pit or tank that catches liquid  runoff for drainage or disposal.
       f. Other (specify)

2.16. Graphics file name  (Optional). You may submit one graphic file to illustrate each release scenario.
Entering a graphics file name in this field will not automatically cause that file to be included in your RMP
submission.  You must take the extra step of copying the graphics file from your hard drive to a diskette.
This diskette can be either the same one that includes your RMP submission ASCII file, or an additional
diskette that contains just your graphics file(s).

Graphics will be accepted in either GIF or JPEG file format. These are the most popular graphics formats
in use today on the Internet. Most commercial drawing, painting, or scanning software supports these two
graphics file formats.  You may want to search www.shareware.com for a list of graphics programs that
are available for download, either as shareware or evaluation versions.

JPEG (pronounced "jay-peg") is a standardized image compression mechanism. JPEG stands for Joint
Photographic Experts Group, the original name of the committee that wrote the standard.  JPEG is
designed for compressing either full-color or gray-scale images of natural, real-world scenes.  It works well
on photographs, naturalistic artwork, and similar material.

GIF (tm) is a standard for defining generalized color "raster" images.  This "Graphics Interchange Format"
allows high-quality, high-resolution graphics to be displayed on a variety of graphics hardware and is
intended as an exchange and display mechanism for graphics images.
RMP* Submit User Manual February 1999                                                   Ch. 2 Pg. 20

-------
SECTIONS   TOXICS: ALTERNATIVE RELEASES
Complete this section for each toxic regulated substance held above the threshold quantity in a Program 2
or Program 3 process.

3.1.a. Chemical Name. Enter the name of the regulated toxic chemical you evaluated in the alternative
release scenario.

3.1.b. Percent weight of chemical (if in a mixture). If your alternative scenario involves the release of a
mixture containing a regulated substance,  enter the percentage weight of the regulated substance in the
mixture. Leave blank if it is not a mixture.

3.2. Physical state.  Select the physical state of the chemical in the vessel that you are modeling.
        a. Gas.
        b. Liquid.
        c. Gas liquified by pressure.
        d. Gas liquified by refrigeration.

3.3. Model used (select one).  Select the source of your results for your alternative release analysis or
enter another model name in "Other."
        a. EPA's OCA  Guidance Reference Tables or Equations
        b. EPA's RMP Guidance for Ammonia Refrigeration Reference Tables or Equations
        d. EPA's RMP Guidance for Waste Water Treatment Plants Reference Tables or Equations
        e. EPA's RMP  Guidance for Warehouses Reference Tables or Equations
        f EPA's RMP Guidance for Chemical Distributors Reference Tables or Equations
        g. EPA's RMP*Comp™
        h. Areal Locations of Hazardous Atmospheres (ALOHA®)
        z. Other model  (specify)

3.4. Scenario. Select one of the following which describes your alternative release scenario or enter
another scenario in Other:
        a. Transfer Hose Failure.  Failure  of the connection between two or more vessels.
        b. Pipe Leak. Release through a rupture in a pipe.
        c. Vessel Leak. Release through a rupture in a vessel.
        d. Overfilling.  Release due to filling a pipe, vessel, or other container past its capacity.
        e. Rupture Disk/Relief Valve. Release due to failure of a rupture disk/relief valve to function
        properly.  A rupture disk/relief valve is a valve that relieves pressure beyond a specified limit; a
        relief valve recloses upon return to normal operating conditions.
        f. Excess Flow Valve Failure. Release caused by the failure of excess flow device to function
        properly and prevent surges from reaching downstream equipment.
        g. Other (specify)

3.5. Quantity released (Ibs).  Enter the quantity of toxic chemical you used for your alternative scenario
analysis in pounds to 2 significant digits.  If you have less than 1 pound released, round up to 1 pound.
You may want to clarify that in your Executive Summary.
RMP* Submit User Manual February 1999                                                   Ch. 2 Pg. 21

-------
3.6. Release rate (Ibs/minute).  Enter the rate of release to the outside air in pounds per minute to 1
significant digit. For example:
         4.3 pounds           should be reported as...  4 pounds
        19 pounds             should be reported as...  20 pounds
See Chapter 4 of the General Guidance for Risk Management Programs  for more information.

3.7. Release duration (minutes).  Indicate the length of time in minutes to the nearest minute for the
released quantity to be released to the outside air (from the time the release starts to the time it is mitigated
or stopped).  See Chapter 4 of the General Guidance for Risk Management Programs  for more
information.

3.8. Wind speed (meters/second). If you used the OCA Guidance or one of EPA's model program
guidance documents, indicate 3 meters per second. If you modeled your scenario separately, indicate the
wind speed used.

3.9. Atmospheric Stability Class.  If you used the OCA Guidance or one of EPA's model program
guidance documents, list "D" stability. If you modeled your scenario separately, indicate the stability class
used.

3.10. Topography (select one). Indicate whether the local topography is urban or rural.  Urban means
that there are many obstacles in the immediate area; obstacles include buildings or trees. Rural means that
the terrain is generally flat and unobstructed in the immediate  area.

3.11. Distance to endpoint (miles). Indicate the distance to the endpoint in miles to 2 significant digits,
using the endpoint specified for the chemical in 40 CFR Part 68, Appendix A.  Convert your modeling
results into miles by dividing the distance in feet by 5280 or yards by 1760. Refer to the following to
determine 2 significant digits:
           .397 miles          should be reported as...   .40 miles
          9.345 miles          should be reported as...  9.3 miles
         20.764 miles          should be reported as...  21 miles

3.12. Residential population within distance to endpoint.  Estimate the population within the circle with
a center at the point of the release and a radius determined by the distance to the endpoint to two significant
digits (e.g., 5,500 people rather than 5,483). Population  estimates include only residential populations.
RMP* Submit User Manual February 1999                                                   Ch. 2 Pg. 22

-------
3.13. Public receptors within distance to endpoint. Public receptors must be identified within the circle
with a center at the point of the release and a radius determined by the distance to the endpoint.  Public
receptor means locations where members of the public may be exposed to toxic concentrations, radiant
heat, or overpressure as a result of the release.  Public receptors include locations within the facility's
property boundary to which the public has routine and unrestricted access during or outside business hours
(e.g. a recreation field). Locations inhabited or occupied by the public at any time without restriction by
the source (such as fences or security guards) are public receptors (see the General Guidance for Risk
Management Programs for more information on identifying public receptors).  You do not need to list
specific locations or estimate populations at these locations. The presence of these receptors may be
determined using local street maps.  Select all that apply.
        a. Schools. Public and private elementary, secondary,  or post-secondary educational institutions
        (e.g., colleges).
        b. Residences
        c. Hospitals
        d. Prisons or  Correctional facilities
        e. Recreation  areas. Including stadiums, parks, and public pools.
        f. Commercial, office, or industrial areas.  Including  industrial  parks, office buildings, shopping
        malls, commercial areas, and commercial farms.
        g. Other (Specify). Include any other additional information here.

3.14. Environmental receptors  within distance to endpoint.  Environmental receptors must be identified
within the circle with a center at the point of the release and a radius determined by the distance to the
endpoint.  Environmental receptor means natural areas, such as national or state parks, forests, or
monuments; officially designated wildlife sanctuaries, preserves, refuges, or areas; and federal wilderness
areas, that could be exposed at any time to toxic concentrations, radiant heat, or overpressure as a result of
the release. Environmental receptors can be identified  on local  U.S. Geological Survey maps, which can be
found at many libraries. Select all that apply.
        a. National or state parks, forests, or monuments
        b. Officially designated wildlife sanctuaries, preserves, or refuges
        c. Federal wilderness areas
        d. Other (Specify). Include any other additional information here.

3.15. Passive mitigation considered.  Select all passive mitigation measures that were considered in
defining the release quantity or rate of the alternative release scenario.
        a. Dikes. A low wall that acts as a barrier to prevent a spill from spreading.
        b. Enclosures. Physical containment of the release within a structure (e.g., a building).
        c. Berms. A mound or wall of earth at the top or bottom of a slope that prevents a spill from
        spreading.
        d. Drains. A channel that carries off surface water.
        e. Sumps. A pit or tank that catches liquid runoff for drainage or disposal.
        f. Other (specify). List  a type other than what is listed above.
RMP* Submit User Manual February 1999                                                    Ch. 2 Pg. 23

-------
3.16. Active mitigation considered. Active mitigation means equipment, devices, or technologies that
need human, mechanical, or other energy input to function. Select all that were considered in defining the
release quantity or rate of the alternative release scenario.
        a. Sprinkler systems.  A system for protecting a building against fire by means of overhead pipes
        which convey an extinguishing fluid through heat activated outlets.
        b. Deluge systems. A system to overflow an area of a release with water or other extinguishing
        fluid.
        c. Water curtain.  A spray of water from a horizontal pipe through nozzles; the curtain may be
        activated manually or automatically.
        d. Neutralization. Making a toxic chemical harmless through chemical reaction.
        e. Excess flow valve. A system for diverting overflow.
        f. Flares. A device for disposing of combustible gases from a chemical process by burning them in
        the open.
        g. Scrubbers. A pre-release protection measure that uses water or aqueous mixtures containing
        scrubbing reagents to remove discharging liquids and possibly also treating the discharging
        chemical.
        h. Emergency shutdown systems. Controls that are triggered when process limits are exceeded
        and that shut down that process.
        i. Other (specify)

3.17. Graphics file name (Optional). You may submit one graphic file to illustrate  each release scenario.
Entering a graphics file name in this field will not automatically cause that file to be included in your RMP
submission. You must take the extra step of copying the graphics file from your hard drive to a diskette.
This diskette can be either the same one that includes your RMP submission ASCII file, or an additional
diskette that contains just your graphics file(s).

Graphics will be accepted in either GIF or JPEG file format.  See 2.16 for an explanation of GIF and
JPEG.
RMP* Submit User Manual February 1999                                                   Ch. 2 Pg. 24

-------
SECTION 4   FLAMMABLES: WORST-CASE
Complete this section for each flammable worst-case scenario you report.

4.1. Chemical.  Enter the name of the regulated flammable chemical you evaluated in the worst-case
scenario.

4.2. Model used (select one).  Select the source of your results for your worst-case release analysis or
enter another model name in "Other."
        a. EPA's OCA Guidance Reference Tables or Equations
        c. EPA's RMP Guidance for Propane Storage Facilities Reference Tables or Equations
        d. EPA's RMP Guidance for Waste Water Treatment Plants Reference Tables or Equations
        e. EPA's RMP Guidance for Warehouses Reference Tables or Equations
        f EPA's RMP Guidance for Chemical Distributors Reference Tables or Equations
        g. EPA's RMP*Comp™
        z. Other model (specify)

4.3. Scenario. This data element is fixed. The worst-case release scenario for a flammable substance is a
vapor cloud explosion, which is an explosion of a cloud containing  a flammable vapor or gas and air.

4.4. Quantity released (Ibs). Enter the quantity of flammable substance you used for your worst-case
scenario analysis in pounds to 2 significant digits.  This is the  total amount that would be lost from a vessel
or pipeline used in the calculation of distance to 1 psi reported in 4.6. See Chapter 2 on Determining
Worst-Case Scenarios in the RMP Offsite Consequence Analysis Guidance for more details.  Here's how
to report the quantity to 2 significant digits:
          5,333 pounds        should be reported as...  5,300 pounds
        107,899 pounds        should be reported as...  110,000 pounds

If you have less than 1 pound released, round up to 1 pound. You may want to clarify that in your
Executive Summary.

4.5. Endpoint used. This data element is fixed. For vapor cloud explosions, the endpoint is 1 psi
overpressure.

4.6. Distance to endpoint (miles). Indicate the distance to the endpoint in miles to 2 significant digits,
using the endpoint specified for the chemical in 40 CFR Part 68, Appendix A.  Convert your modeling
results into miles by dividing the distance in feet by 5280 or yards by 1760. Refer to the following to
determine 2 significant digits:
           .397 miles          should be reported as...   .40 miles
          9.345 miles          should be reported as...  9.3 miles
         20.764 miles          should be reported as...  21 miles

4.7. Residential population within distance to endpoint. Estimate  the population within the circle with a
center at the point of the release and a radius determined by the distance to the endpoint to two significant
digits (e.g., 5,500 people rather than 5,483). Population estimates include only residential populations.
RMP* Submit User Manual February 1999                                                   Ch. 2 Pg. 25

-------
4.8. Public receptors within distance to endpoint.  Public receptors must be identified within the circle
with a center at the point of the release and a radius determined by the distance to the endpoint.  Public
receptor means locations where members of the public may be exposed to toxic concentrations, radiant
heat, or overpressure as a result of the release. Public receptors include locations within the facility's
property boundary to which the public has routine and unrestricted access during or outside business hours
(e.g. a recreation field). Locations inhabited or occupied by the public at any time without restriction by
the source (such as fences or security guards) are public receptors (see the General Guidance for Risk
Management Programs for more information on identifying public receptors). You do not need to list
specific locations or estimate populations at these locations. The presence of these receptors may be
determined using local street maps.  Select all that apply.
        a. Schools. Public and private elementary, secondary, or post-secondary educational institutions
        (e.g., colleges).
        b. Residences
        c. Hospitals
        d. Prisons or  Correctional facilities
        e. Recreation areas. Including  stadiums, parks, and public pools.
        f. Commercial, office, or industrial areas.  Including industrial parks, office buildings,  shopping
        malls, commercial areas, and commercial farms.
        g. Other (Specify).  Include any other additional information here.

4.9. Environmental receptors within distance to endpoint.  Environmental receptors must be identified
within the circle with a center at the point of the release and a radius determined by the distance to the
endpoint.  Environmental receptor means natural areas,  such as national or state parks, forests, or
monuments; officially designated wildlife sanctuaries, preserves, refuges, or areas; and federal wilderness
areas, that could be exposed at any time  to toxic concentrations, radiant heat, or overpressure as  a result of
the release. Environmental receptors can be identified on local U.S. Geological Survey maps, which can be
found at many libraries. Select all that apply.
        a. National or state parks, forests, or monuments
        b. Officially designated wildlife sanctuaries, preserves, or refuges
        c. Federal wilderness areas
        d. Other (Specify).  Include any other additional information here.

4.10. Passive mitigation considered.  Select all passive mitigation measures that were considered in
defining the release quantity or rate for the worst-case scenario.
        a. Blast Walls. A heavy wall used  to isolate buildings or areas that contain highly combustible or
        explosive materials.
        b. Other (specify)

4.11.  Graphics file name (Optional). You may submit one graphic file to illustrate each release scenario.
Entering a graphics file name in this field will not automatically cause that file to be included in your RMP
submission. You must take the extra step of copying the graphics file from your hard drive to a diskette.
This diskette  can be either the same one that includes your RMP submission ASCII file, or an additional
diskette that contains just your graphics file(s).

Graphics will be accepted in either GIF or JPEG file format.  See 2.16 for an explanation of GIF and
JPEG.
RMP* Submit User Manual February 1999                                                    Ch. 2 Pg. 26

-------
SECTIONS   FLAMMABLES:  ALTERNATIVE RELEASES
Complete this section for each flammable alternative release scenario you report.

5.1. Chemical.  Enter the name of the regulated flammable chemical you evaluated in the alternative
release scenario.

5.2. Model used (select one).  Select the source of your results for your alternative release analysis or
enter another model name in "Other."
       a.  EPA's OCA Guidance Reference Tables or Equations
       c.  EPA's RMP Guidance for Propane Storage Facilities Reference Tables or Equations
       d.  EPA's RMP Guidance for Waste Water Treatment Plants Reference Tables or Equations
       e.  EPA's RMP Guidance for Warehouses Reference Tables or Equations
       f EPA's RMP Guidance for Chemical Distributors Reference Tables or Equations
       g.  EPA's RMP*Comp™
       z.  Other model (specify)

5.3. Scenario. Select one of the  following or enter another scenario in Other:
       a.  Vapor Cloud Explosion. An explosion of a cloud containing a flammable vapor or gas and air.
       b. Fireball.  The atmospheric burning of a fuel-air cloud in which the energy is mostly emitted in
       the form of radiant heat.  As the buoyancy forces of the hot gases begin to dominate, the burning
       cloud rises and becomes  spherical in shape. Often caused by the ignition of a vapor cloud of a
       flammable substance.
       c.  BLEVE.  Boiling Liquid Expanding Vapor Explosion (BLEVE) is used to describe the sudden
       rupture  of a vessel/system containing liquefied flammable gas under pressure due to radiant heat
       flux. The pressure burst and the flashing of the liquid to vapor creates a blast wall and potential
       missile damage, and immediate ignition of the expanding fuel-air mixture leads to an intense
       combustion creating a fireball.
       d. Pool  Fire. The combustion of material evaporating from a layer of liquid at the base of the fire.
       e.  Jet Fire.  Gas discharging or venting from a rupture will form a gas jet that "blows" into the
       atmosphere in the direction the hole is facing, all the while entraining and mixing with air. If the
       gas is flammable and encounters an ignition source, a flame jet may form.
       f. Vapor Cloud Fire.  A flash fire results from the ignition of a released flammable cloud in which
       there is  essentially no increase in the combustion rate.
       g.  Other (specify)

5.4. Quantity released (Ibs).  Enter the quantity of the flammable substance you used for your alternative
scenario analysis in pounds to 2 significant digits. If you have less than 1 pound released, round up to 1
pound. You may want to clarify that in your Executive Summary.

5.5. Endpoint used. For vapor cloud explosions, the endpoint is 1 psi overpressure; for a fireball the
endpoint is 5 kW/m2 for 40 seconds; for vapor cloud fires or jet fires, a lower flammability limit (expressed
as a percentage) may be listed as specified in NFPA documents or other generally recognized sources.
These are listed  in the OCA Guidance.
RMP* Submit User Manual February 1999                                                  Ch. 2 Pg. 27

-------
5.6. Distance to endpoint (miles). Indicate the distance to the endpoint in miles to 2 significant digits,
using the endpoint specified for the chemical in 40 CFR Part 68, Appendix A.  Convert your modeling
results into miles by dividing the distance in feet by 5280 or yards by 1760.  Refer to the following to
determine 2 significant digits:
            .397 miles          should be reported as...   .40 miles
          9.345 miles          should be reported as... 9.3 miles
         20.764 miles          should be reported as... 21 miles

5.7. Residential population within distance to endpoint.  Estimate the population within the circle with a
center at the point of the release and a radius determined by the distance to the endpoint to two significant
digits (e.g., 5,500 people rather than 5,483).  Population estimates include only residential populations.

5.8. Public receptors within distance to endpoint.  Public receptors must be identified within the circle
with a center at the point of the release and a radius determined by the distance to the endpoint. Public
receptor means locations where members of the public may be exposed to toxic concentrations, radiant
heat, or overpressure as a result of the release.  Public receptors include locations within the facility's
property boundary to which the public has routine and unrestricted access during or outside business hours
(e.g. a recreation field). Locations inhabited or occupied by the public at any time without restriction by
the source (such as fences or security guards) are public receptors (see the General Guidance for Risk
Management Programs for more information on identifying public receptors). You do not need to list
specific locations or estimate populations at these locations. The presence of these receptors may be
determined using local street maps.  Select all that apply.
        a. Schools. Public and private elementary, secondary,  or post-secondary educational institutions
        (e.g., colleges).
        b. Residences
        c. Hospitals
        d. Prisons or  Correctional facilities
        e. Recreation areas. Including stadiums, parks, and public pools.
        f. Commercial, office, or industrial areas.  Including industrial parks, office buildings, shopping
        malls, commercial areas, and commercial farms.
        g. Other (Specify). Include any other additional information here.

5.9. Environmental receptors within distance to endpoint. Environmental receptors must be identified
within the circle with a center at the point of the release and a radius determined by the distance to the
endpoint.  Environmental receptor means natural areas, such as national or state parks, forests, or
monuments; officially designated wildlife sanctuaries, preserves, refuges, or areas; and federal wilderness
areas, that could be exposed at any time to toxic concentrations, radiant heat, or overpressure as a result of
the release.  Environmental receptors can be identified on local U.S. Geological Survey maps, which can be
found at many libraries.  Select all that apply.
        a. National or state parks, forests, or monuments
        b. Officially designated wildlife sanctuaries, preserves, or refuges
        c. Federal wilderness areas
        d. Other (Specify). Include any other additional information here.
RMP* Submit User Manual February 1999                                                    Ch. 2 Pg. 28

-------
5.10. Passive mitigation considered.  Select all passive mitigation measures that were considered in
defining the release quantity or rate for the alternative scenario.
       a. Dikes. A low wall that acts as a barrier to prevent a spill from spreading.
       b. Fire Walls. A wall constructed to prevent the spread of fire.
       c. Blast Walls.  A heavy wall used to isolate buildings or areas that contain highly combustible or
       explosive materials.
       d. Enclosures.  Physical containment of the release within a structure (e.g., a building).
       f. Other (specify)

5.11. Active mitigation considered.  Active  mitigation means equipment, devices, or technologies that
need human, mechanical, or other energy input to function.  Select all that were considered in defining the
release quantity or rate of the alternative release scenario.
       a. Sprinkler Systems. A system for protecting a building against fire by means of overhead pipes
       which convey an extinguishing fluid through heat activated outlets.
       b. Deluge Systems. A system to overflow an area of a release with water or other extinguishing
       fluid.
       c. Water Curtain. A spray of water from a horizontal pipe through nozzles, the curtain may be
       activated manually or automatically.
       d. Excess Flow Valve.  A system for diverting overflow.
       e. Other (specify)

5.12.  Graphics file name (Optional).  You may submit one graphic file to illustrate each release  scenario.
Entering a graphics file name in this field  will not automatically cause that file to be included in your RMP
submission. You must take the extra step of copying the graphics file from your hard drive to a diskette.
This diskette can be either the same one that includes your RMP submission ASCII file, or an additional
diskette that contains just your graphics file(s).

Graphics will be accepted in either GIF or JPEG file format.  See 2.16 for an explanation of GIF and
JPEG.
RMP* Submit User Manual February 1999                                                   Ch. 2 Pg. 29

-------
SECTION 6:   FIVE-YEAR ACCIDENT HISTORY

Although much of the RMP is a summary of the risk management program at your facility, this portion of
the RMP includes all of the five-year accident history information required under § 68.42. Therefore, for
this section of the RMP you can simply insert the data you compiled for § 68.42. Only report accidents
involving listed substances.

Did your facility have any reportable accidents in the last 5 years? If your facility did not have any
reportable accidents in the last five years, then check no to confirm and leave the rest of this section blank.
If your facility did have reportable accidents in the last five years, then fill in this section for each.

6.1. Date of accident.  Indicate the date on which the accident occurred.

6.2. Time accident began.  Indicate the time the release began.

6.3. NAICS Code of process involved. Enter the NAICS code that most closely corresponds to the
process; it will not necessarily be the same NAICS code for your facility as a whole.  As described in
Registration, the NAICS code system classifies businesses by fitting them into descriptive categories that
correspond to five-digit or six-digit codes. Appendix B of the General Guidance for Risk Management
Programs provides the NAICS codes for the industry sectors most likely to subject to 40 CFR Part 68.
You may also access the full list on-line at http://www.census.gov/epcd/www/naics.html.

Although you are only required to report accidents on covered processes, you may choose to report other
accidents as well. Therefore, RMP*Submit provides the full list of NAICS codes to choose from.

6.4. Release duration. Indicate the approximate length of time of the release in hours and minutes.
(Format: HHHMM)

6.5.a.i. Chemical name.  Indicate the regulated substance(s) released. Use the name of the substance as
listed rather than a synonym.  If the release was aNFPA-4 flammable mixture containing regulated
flammables, you may list it as a "flammable mixture" and list all of the regulated substances contained in
the mixture. For the quantity released, you only report the quantity of the entire mixture, not the individual
substances. Only report chemicals that are listed substances.

6.5.a.ii. CAS number. Provide the  Chemical Abstracts Service (CAS) registry number for each chemical
name in 6.5.a.i. above. CAS  numbers are listed in 40  CFR § 68.130 and in EPA's General Guidance for
Risk Management Programs  . RMP* Submit will automatically generate the CAS # based on the chemical
name chosen.  For flammable mixtures, because there is no CAS #, leave this field blank.  RMP* Submit
will assign a "dummy" CAS number of all zeros for flammable mixtures.

6.5.b. Quantity released.  Estimate the amount of each substance released in pounds. The amount should
be estimated to two significant digits, or as close as possible. For example, if you estimate that the release
was between 850 and 900 pounds, provide a best guess.  EPA recognizes that you may not know precise
quantities.

For toxics in a  mixture, determine the maximum quantity of the mixture and then multiply the weight of the
regulated toxic substance to determine the quantity; do not report the weight of the entire mixture.  For
example, if you have a 100,000 pound mixture of ammonia at 20% concentration, then you would multiply

RMP*Submit User Manual February 1999                                                  Ch. 2 Pg. 30

-------
the weight percent (20%) by the total quantity (100,000 pounds) to determine the quantity released of
ammonia was 20,000 pounds.

For flammables in a mixture that meets the criteria of NFPA-4, report the entire weight of the mixture.

6.5.c. Percent weight of toxic chemical in mixture. If a toxic substance was in a mixture when released,
indicate the percentage weight of the regulated substance in the mixture.

6.6. Release event. Indicate which of the following release events best describes your accident.  Select at
least one:
        a. Gas Release.  A gas release is a release of the substance in a vapor state.  If you hold a gas
        liquefied under refrigeration, report the release as  a liquid spill.
        b. Liquid Spill/Evaporation. A liquid spill/ evaporation is a  release of the substance in a liquid
        state  with subsequent vaporization.
        c. Fire.
        d. Explosion.

6.7. Release source. Select at least one.
        a. Storage Vessel. A storage vessel is a container used only to store or hold (as opposed to react,
        mix,  or move) a regulated substance.  Storage vessels  include transportation containers (e.g.,
        railcars or tank trucks) being used for on-site storage.
        b. Piping. Piping refers to a system of pipes used to carry a fluid or gas.
        c. Process Vessel. A process vessel is a container in which regulated substances are
        manufactured, reacted, or mixed.
        d. Transfer Hose. A transfer hose is a flexible tube used to connect, often temporarily, two or
        more vessels.
        e. Valve. A valve is a device used to regulate the  flow in piping systems or machinery. Relief
        valves open to release pressure in vessels.
        f. Pump. A pump is a device that raises, transfers, or  compresses fluids or that attenuates gases by
        suction or pressure or both.
        g. Joint. The surface at which two or more mechanical components are united.
        h. Other.  Specify other source of the release.

6.8. Weather conditions at time of event (if known).  This information is important to those concerned
with modeling the effects of accidents. Reliable information from those involved in the incident or from an
on-site weather station is ideal. However, the rule does not require your facility to have an on-site weather
station. If you do not have an on-site weather station, use  information from your local weather station,
airport, or other source of meteorological data. Historical wind speed and temperature data (but not
stability data) can be obtained from the National Climatic Data Center (NCDC) at (828) 271-4800; NCDC
staff can also provide information on the nearest weather station. To the extent possible, complete the
following:

        a.i. Wind speed.  Wind speed is an estimate of how fast the wind is traveling.

        a.ii. Wind speed units.  Indicate the units in which the speed is expressed as either miles per hour,
        meters per second, or knots.
RMP* Submit User Manual February 1999                                                    Ch. 2 Pg. 31

-------
        a.iii.  Wind direction. Wind direction is the direction from which the wind comes. For example, a
        wind that blows from east to west would be described as having an eastern wind direction.
        Describe wind direction as one of the  16 standard compass readings [N, S, E, W, NE, SE, NW,
        SW, NNE, ENE, ESE, SSE, SSW, WSW, WNW, NNW], using the abbreviation. For example,
        wind direction must be reported as S for South, NE for Northeast, or SSW for South-Southwest.

        b. Temperature. The ambient temperature at the scene of the accident in degrees Fahrenheit. If
        you did not keep a record, you can use the high (for daytime releases) or low (nighttime releases)
        for the day. Local newspapers publish these data.

        c. Atmospheric Stability Class.  Depending on the amount of incoming solar radiation as well as
        other factors, the atmosphere may be more or less turbulent at any given time. Meteorologists have
        defined six atmospheric stability classes, each representing a different degree of turbulence in the
        atmosphere.  When moderate to strong incoming  solar radiation heats air near the ground, causing
        it to rise and generating large eddies, the atmosphere is considered unstable, or relatively turbulent.
        Unstable conditions are associated with stability classes A and B. When solar radiation is
        relatively weak, air near the surface has less of a tendency to rise and less turbulence develops. In
        this case, the atmosphere is considered stable or less turbulent with weak winds; the stability class
        is E or F.  Stability classes D and  C represent conditions of more neutral stability, or moderate
        turbulence.  Neutral conditions are associated with relatively strong wind speeds and moderate
        solar radiation.  Enter either A, B, C, D, E, or F.

                                   Atmospheric Stability Classes
SURFACE WIND SPEED
AT 10 METERS
ABOVE GROUND
Meters per
second
<2
2-3
3-5
5-6
>6
Miles per
hour
<4.5
4.5-7
7-11
11-13
>13
DAY
Incoming Solar Radiation
Strong* *
A
A-B
B
C
C
Moderate
A-B
B
B-C
C-D
D
Slight***
B
C
C
D
D
NIGHT*
Thinly
Overcast or
> 4/8 low
cloud

E
D
D
D
< 3/8 Cloud

F
E
D
D
*Night refers to one hour before sunset to one hour after dawn.
** Sun high in the sky with no clouds.
*** Sun low in the sky with no clouds.

       d. Precipitation present. Hail, mist, rain, sleet, or snow.  Check the box to indicate there was
       precipitation at the time of the accident.
RMP* Submit User Manual February 1999
Ch. 2 Pg. 32

-------
        e. Unknown weather conditions.  If you have no record for any of the weather data, indicate
        "unknown".  EPA recognizes that you may not have weather data for accidents that have occurred
        prior to June 1996. You must, however, collect these data during future accident investigations.

6.9. On-site impacts. Complete each of the following about on-site effects.  Enter a number for each
entry; if there were no impacts, enter 0.
        a. Deaths. Indicate the number of on-site deaths that are attributable to the accident or mitigation
        activities. On-site deaths include anyone who was killed by direct exposure to toxic
        concentrations, radiant heat, or overpressures from the accidental release or from indirect
        consequences of a vapor cloud explosion from an accidental release (e.g., a window shattering after
        an explosion).  If there were no on-site deaths, enter 0.  Specify the deaths as:
               a.i.  Employees & contract employees
               a.ii. Public responders (example, fire department personnel)
               a.iii. Public (example, visitors)

        b. Injuries. An injury is any effect that results either from direct exposure to toxic concentrations,
        radiant heat, or overpressures from the accidental release or from indirect consequences of a vapor
        cloud explosion from an accidental release (e.g., a window shattering after an explosion) and that
        requires medical treatment or hospitalization. Medical treatment means treatment, other than first
        aid, administered by a physician or registered professional personnel under standing orders from a
        physician (OSHA  Oil Log, 1904.12). Your OSHA occupational injury and illness log will help
        complete these items. If there were no on-site injuries, enter 0.  Specify the injuries as:
               a.i.  Employees & contract employees
               a.ii. Public responders (example, fire department personnel)
               a.iii. Public (example, visitors)

        c. Property damage. Estimate the value of the equipment or business structures at your facility
        that were damaged by the accident or mitigation activities.  Record the value in American dollars.
        Insurance claims may provide this information.  Do not include any losses that you may have
        incurred as a result of business interruption.  If there was no on-site property damage or no known
        damage, enter 0.

6.10. Known off-site impacts.  These are impacts that you should be aware of (e.g., from media reports)
or that were reported to your facility. You are not required to conduct an additional investigation to
determine off-site impacts. Enter a number for each entry; if there were no impacts, enter 0.

        a. Deaths. Indicate the number of off-site deaths that are attributable to the accident or mitigation
        activities. Off-site deaths include anyone who was killed by direct exposure to toxic
        concentrations, radiant heat, or overpressures from the accidental release or from indirect
        consequences of a vapor cloud explosion from an accidental release (e.g., a window shattering after
        an explosion).  Responders killed while on site responding to the release are considered  on-site
        deaths and should not be reported here. If there were no known off-site deaths, enter 0.
RMP* Submit User Manual February 1999                                                    Ch. 2 Pg. 33

-------
       b. Hospitalizations. Indicate the number of people requiring hospitalization. Hospitalization
       means any effect that results either from direct exposure to toxic concentrations, radiant heat, or
       overpressures from accidental releases or from indirect consequences of a vapor cloud explosion
       from an accidental release (e.g., a window shattering after an explosion) and that requires
       hospitalization. If there were no known off-site hospitalizations, enter 0.

       c. Other medical treatment. Indicate the number of people requiring medical treatment.  Medical
       treatment means any effect that results either from direct exposure to toxic concentrations, radiant
       heat, or overpressures from accidental releases or from indirect consequences of a vapor cloud
       explosion from an accidental release (e.g., a window shattering after an explosion) and that
       requires medical treatment. If there was  no known medical treatment, enter 0.

       d. Evacuated.  Estimate the number of people who were evacuated to prevent exposure that might
       have resulted from the accident. A total  count of the number of people evacuated is preferable to
       the number of houses evacuated. People who were ordered to move simply to improve access to
       the site for emergency vehicles are not considered to have been evacuated. If there were no
       evacuations, enter 0.

       e. Sheltered-in-place.  Estimate the number of people who were sheltered-in-place during the
       accident.  Sheltering-in-place occurs when the incident commander orders residents to remain
       inside their home or place of work until the emergency has ended to prevent exposure to the
       substance. Usually these are associated with an emergency broadcast or similar method of mass
       notification by response agencies.   If no one sheltered in place, enter 0.

       f. Property damage. Estimate the value of the equipment or structures offsite that were damaged
       by the accident or mitigation activities.  Record the value in American dollars. Insurance claims
       may provide this information. There is no lower limit below which you would not have to  report.
       If there was no property damage, enter 0.

       g. Environmental damage.  Indicate whether any environmental damage occurred and specify the
       type. The damage is not limited to environmental receptors listed in the rule.  Any damage to the
       environment (e.g., dead or injured animals, defoliation, water contamination) must be considered.
       You are not, however, required to conduct surveys to determine whether such impact occurred.
       Select all that apply.
               g. 1.    Fish or animal kills.
               g.2.    Tree, lawn,  shrub, or crop damage
               g.4.    Water contamination
               g.4.    Soil contamination
               g.5.    Other (specify)
RMP*Submit User Manual February 1999                                                    Ch. 2 Pg. 34

-------
6.11. Initiating event.  Select the one initiating event that best describes the immediate cause of the
accident.
        a. Equipment Failure.  A device or piece of equipment failed or did not function as designed. For
        example, the vessel wall corroded or cracked.
        b. Human Error. An operator performed a task improperly, either by failing to take the necessary
        steps or by taking the wrong steps.
        c. Natural (weather conditions, earthquake). Weather conditions, such as lightning, hail, ice
        storms, tornados, hurricanes, earthquakes, floods, or high winds, caused the accident.
        d. Unknown.

6.12. Contributing factors. These are factors that contributed to the accident occurring, but were not the
initiating event. If you conducted  an investigation of the release, you should have identified factors that led
to the initiating event. Select all that apply.

        a. Equipment failure. A  device or piece of equipment failed to contain substance or did not
        function as designed, thereby allowing a substance to be released.

        b. Human error. An operator performed an operation improperly or made a mistake which
        resulted in an accident.

        c. Improper procedures. The procedure did not reflect the proper method of operation, the
        procedure omitted steps that affected the accident, or the procedure was written in a manner that
        allowed for misinterpretation of the instructions.

        d. Overpressurization. The process was operated at pressures exceeding the design working
        pressure.

        e. Upset condition.  Release was caused by incorrect process conditions (e.g., increased
        temperature or pressure).

        f. By-pass condition. The failure occurred in a pipe, channel, or valve that diverts fluid flow from
        the main pathway when design process or storage conditions are exceeded (e.g., overpressure).
        By-pass conditions may be designed to release the substance to restore acceptable process or
        storage conditions and prevent more severe  consequences (e.g., explosion).

        g. Maintenance activity or inactivity. The failure occurred because of maintenance activity or
        inactivity.  An example  of maintenance activity is putting the wrong gasket on a tank fitting.  An
        example of maintenance inactivity is storage racks that remained unpainted for so long that
        corrosion caused the metal to fail.

        h. Process design failure. The failure resulted from an inherent flaw in the design of the process
        (e.g., pressure needed to make product exceeds the design pressure of the vessel).

        i. Unsuitable equipment.  The equipment used was incorrect for the process.  For example, the
        forklift was too large for the corridors.

        j. Unusual weather conditions. Weather conditions, such as lightning, hail, ice storms, tornados,
        hurricanes, earthquakes, floods, or high winds caused the accident.

RMP* Submit User Manual February 1999                                                    Ch. 2  Pg. 35

-------
        k. Management error. The failure occurred because management did not exercise its managerial
        control to prevent the situation from arising.  This is usually used to describe faulty procedures,
        inadequate training, inadequate oversight, or failure to follow existing administrative procedures.

        1. Other (specify)

6.13. Off-site responders notified (select one).  Indicate whether response agencies (e.g., police, fire,
medical services) were notified.  Check one of the following choices:
        a. Notified Only
        b. Notified and Responded
        c. No, not notified
        d. Unknown.

6.14. Changes introduced as a result of the  accident. Indicate any measures that you have taken at the
facility to prevent recurrence of the accident.  Select at least one.
        a. Improved/upgraded equipment.  A device or piece of equipment that did not function as
        designed was repaired or replaced.
        b. Revised maintenance. Maintenance procedures were clarified or changed to ensure appropriate
        and timely maintenance including inspection and testing (i.e., increasing the frequency of inspection
        or adding a testing method).
        c. Revised training.  Training programs were clarified or changed to ensure that employees and
        contract employees are aware of and  are practicing correct safety and administrative procedures.
        d. Revised operating procedures. Operating procedures were clarified or changed to ensure that
        employees and contract employees are trained on appropriate operating procedures.
        e. New process controls. New process designs and controls were installed to correct problems
        and prevent recurrence of an accidental release.
        f. New mitigation systems.  New mitigation systems were initiated to limit the severity of
        accidental releases.
        g. Revised emergency response plan.  The emergency response plan was  revised.
        h. Changed process. Process was altered to reduce the risk (e.g., process chemistry was
        changed).
        i. Reduced inventory. Inventory was reduced at the facility to reduce the potential release
        quantities and the magnitude of the hazard.
        j. None. No changes initiated at facility as a result of the accident (i.e., none were necessary or
        technically feasible).  There may be some accidents that could not have been prevented because
        they were caused by events that are too rare to merit additional steps. For example, if a tornado hit
        your facility and you are located in an area where tornados are very rare, it may not be reasonable
        to design a "tornado-proof process even if it is technically feasible.
        k. Other (specify).
RMP*Submit User Manual February 1999                                                   Ch. 2 Pg. 36

-------
OVERVIEW OF PREVENTION PROGRAMS (SECTIONS 7-8)

How Must Prevention Program Data Be Reported?

Prevention program data must be reported on a process-by-process basis. In other words, you must fill out
the prevention program section of the RMP for each Program 2 or Program 3 process you have that is
subject to the RMP rule.

How to report the prevention program for a process depends on how many units the process contains and
whether the prevention program applies different safeguards to different units in the process.  The RMP
rule broadly defines "process" to include interconnected or co-located production and storage units. Under
the definition, multiple units and, in some cases, whole sources may be a single "process" for purposes of
the RMP rule. For multiple unit processes, EPA recognizes that prevention program implementation may
involve different safeguards for different units in the process.  For example, different production units may
have different operating procedures. At the same time, some safeguards, such as management of change
procedures, may apply to all the units in the process. To accommodate these circumstances, RMP*Submit
includes two features which make it easier to indicate how a prevention program applies to a multiple-unit
process.

If your process consists of two or more units and different safeguards apply to different units  in that
process, you can report the prevention program for that process in one of the two following ways. You
must, however, use one of the two ways to report your program.

       Use the description field in the prevention program to describe in narrative form how  your
       prevention program is implemented with respect to the different units in the process. You could
       start by listing the common prevention program elements you implement for all of the units (e.g.,
       use of an alarm system or standard management of change procedures). You would then indicate
       what additional prevention program elements you employ for specified units (e.g., use of a dike for
       certain process units).

       Report your prevention program for the process on a unit-by-unit basis by filling out the prevention
       program portion of the RMP for every unit in the process, rather than for the process as a whole.
       That way, the differences in the program as it relates to each unit will be clear from the report.
       However, as noted above, some aspects of a prevention program may be common to all units.  To
       simplify the reporting of common elements, RMP* Submit has an autocopy feature that allows you
       to enter data elements only once.  This feature works by entering the common elements into
       RMP* Submit and then hitting the COPY function at the bottom of the screen to copy that
       information to another prevention program  "record."  (If you are submitting on paper, you can
       achieve the same effect by filling in the common data elements first and then copying the pages
       containing the common data elements.) To complete the prevention program record for each unit,
       enter the remaining data which is unique to each.

If your process consists of only one unit, or you apply every element of your prevention program to all the
units in the process, you are not required to complete the description section of this portion of the RMP or
report on a unit-by-unit basis.  However, you may use the description field to elaborate on your prevention
program.
RMP*Submit User Manual February 1999                                                   Ch. 2 Pg. 37

-------
Many prevention program data elements ask you to enter the date for the most recent "review or revision"
of a prevention program element required by part 68.  For your first RMP submission, if you are subject to
prevention program requirements only under the RMP rule (as opposed to other federal or state laws), you
should enter the date by which you completed the prevention program element being addressed. For
instance, for data element number 7.5, "Date of most recent review or revision of operating procedures, "
you should enter the date by which you met the operating procedures requirements of section 68.69(a) of
the  RMP rule (if applicable to you).  Since this requirement must be met by the time your first RMP is
due, you may enter the date you complete or  submit your first RMP. In the case of data element number
7.3  ("Date on which safety information was last reviewed or revised"), you should enter the date you met
the  requirement of section 68.65(a) (if applicable to you), since section 68.65(a) requires you to meet the
requirement before you conduct the process hazard analysis for the process.

If you are subject to prevention program requirements under other federal or state laws, you may be in
compliance with RMP prevention program requirements as a result of complying with the other laws.
Sources subject to OSHA PSM, for example, may already meet RMP prevention program requirements for
Program 3 processes, since those requirements are identical to OSHA PSM prevention program
requirements.  For your first RMP submission, if you have fulfilled RMP prevention program requirements
in complying with other federal or state laws, you should enter the date you complied with the requirement
or the date you last reviewed or revised the relevant aspect of your program, whichever is later. For
example, OSHA PSM and the RMP rule both require covered sources to compile and update (under
specified circumstances) process safety information. If you previously compiled the information for
purposes of complying with OSHA PSM and you have not updated it since, you should enter the date you
compiled it for OSHA in your RMP.  If you have updated the information since compiling it, you should
enter the date of the update.

For subsequent RMP submissions, you should enter the date by which you completed any review or
revision of a prevention program element.  Several prevention program elements must be reviewed and, if
necessary, revised following a change affecting the process (see, e.g.,  requirement to update safety
information in section 68.75(d)). Under the compliance  audit requirement of sections 68.58 or 68.79 of the
RMP Program, all prevention program elements must be reviewed and, if appropriate, revised every three
years.  When you re-submit your next RMP (due every 5 years or more frequently based on the
requirements in section  68.190), you are required to fully update and certify all nine sections of the RMP.
If, by the time  you re-submit, you have reviewed or revised one or more prevention program elements as a
result of a change  or an audit, you must enter the date of your review  or revision.
RMP* Submit User Manual February 1999                                                   Ch. 2 Pg. 38

-------
SECTION 7:  PREVENTION PROGRAM FOR PROGRAM 3 PROCESSES
Complete this section for each prevention program you report.

Prevention program description. If different safeguards apply to different units in your process, use this
field to explain how the prevention program for the process relates to the different units in the process.  For
example, "This process includes three interconnected production units, A, B, and C. Everything in this
prevention program applies to all three units, with the following exceptions:
- The dates of the PHA, which are 01/02/97, 6/5/96 and 4/3/96 for units A, B and C, respectively.
- Production unit A uses only a scrubber as a process control, while units B and C have relief valves and
scrubbers.
- The water curtain indicated as a mitigation measure applies only to production unit C."

If you have so many "exceptions" that it gets too complicated to explain as above, but you still have many
common data elements, you can report your prevention program on a unit-by-unit basis. To simplify such
reporting, you can use the autocopy feature in  RMP* Submit so that you only have to enter the common
data elements once. First, enter the common elements into RMP* Submit (or the paper form, if you are
submitting in paper), then hit the COPY function at the bottom of the screen to copy that information to
another prevention program "record" (if you are submitting in paper, photocopy the pages). To complete
the prevention program record for each unit, enter the remaining data which is unique to each.

7.1. NAICS code for the process. Enter the NAICS code that most closely corresponds to the process; it
will not necessarily be the same NAICS code for your facility as a whole. The NAICS code that you
choose must be one that you've already entered in the Registration Section for the covered process. If you
have two processes with the same NAICS code, explain in the above description field which of the two
processes this prevention program relates to.  RMP* Submit will produce a list of the NAICS codes that
you have already entered for your registered processes as a pick list for this data element.  As described in
the Registration section of this manual, the NAICS code system classifies businesses by type using
descriptive categories that correspond to five-digit or six-digit codes.

7.2. Chemical name(s).  For each prevention program, provide the names of all regulated substances held
above the threshold in the covered units. If you have an NFPA-4 flammable mixture containing regulated
flammables, you may list it as a flammable mixture.  You do not need to list the individual substances in
the flammable mixture.

7.3. Date on which the safety information was last reviewed or revised.  The safety information
requirements for Program 3 processes can be found at 40 CFR §68.65. For your first RMP submission,
enter the  date you complied with the requirement of §68.65(a) (compile safety information) for the process
or the date you last reviewed or revised the safety information, whichever is later.  (As explained in the
introduction to Section 7, the date you enter may depend on whether you are subject to the same or similar
requirement under other federal or state laws.) For subsequent RMPs, enter the date the safety  information
was most recently reviewed or revised.  Safety information may be reviewed or revised as a result of,
among other things, a change to the process (see §68.75(d)) or a periodic audit of the prevention program
(see  §68.79(a)). If the safety information was  not reviewed or revised  since the previous RMP was
submitted, reenter the date provided in the  previous RMP.

7.4. Process Hazard Analysis (PHA). The PHA requirements for Program 3 processes can be found at
40 CFR §68.67. Provide the following information about the PHA you conducted for the process.
RMP* Submit User Manual February 1999                                                   Ch. 2 Pg. 39

-------
       a. Date of last PHA or PHA update.  The date you completed or updated your most recent PHA.
       b. Technique used.  Check any of the following techniques that you used to evaluate the hazards
       of your process or part of the process (see Chapter 7, Appendix 7-A, of the General Guidance for
       Risk Management Programs for a description of these techniques).  Select at least one:
              b.l. What If
              b.2. Checklist
              b.3. What If/Checklist (combined)
              b.4. HAZOP
              b.5. Failure Mode & Effects Analysis
              b.6. Fault Tree Analysis
              b.7. Other (specify)

       7.4.c. Expected or actual date of completion of all changes resulting from last PHA or PHA
       update. Enter the date you completed or expect to complete any changes resulting from the PHA.
       This may be blank if there were no changes.

       7.4.d. Major hazards identified (select at least one). Any major hazards that were identified for
       the process or part of the process as a result of the PHA.  Major hazards are described below.
7.4.d. Major Hazard
1. Toxic Release
2. Fire
3. Explosion
4. Runaway reaction
5. Polymerization
6. Overpressurization
7. Corrosion
8. Overfilling
9. Contamination
Description
If an accidental release occurred, a regulated toxic substance could be
released. For listed toxics, a toxic release will always be a major hazard.
Process upsets, leaks, equipment failure, etc., could result in a fire. For
listed flammables, fire will always be a major hazard. Fire may also be a
hazard for some listed toxics, and in some processes could cause a toxic
release.
Confined or unconfmed vapor cloud explosions. For listed flammables,
explosion will generally be a major hazard. Explosion may also be a
hazard for toxics, especially those handled under extreme conditions.
An uncontrolled reaction that proceeds at an increasing rate.
A chemical reaction that produces the bonding of two or more monomers.
Instantaneous energy release or detonation.
Corrosion could lead to destruction of equipment and release of a
regulated substance. Corrosion is likely to be a major hazard for
substances identified as corrosives on MSDSs unless the equipment used
limits the hazard.
Filling a tank or vessel beyond its maximum safe capacity.
A release could occur if inappropriate substances are introduced into
storage or process vessels. Contamination may be a major hazard when
controlling inappropriate substances (e.g., H2O) is difficult.
RMP* Submit User Manual February 1999
Ch. 2 Pg. 40

-------
7.4.d. Major Hazard
10. Equipment failure
11. Loss of cooling,
heating, electricity,
instrument air
12. Earthquake
13. Floods (Flood Plain)
14. Tornadoes
15. Hurricanes
16. Other
Description
Equipment failure is likely to be a major hazard for most processes,
because such failure could lead to a release. Equipment failure includes
cracks, weld failures, disk failures, ruptures, pump/gauge/control system
failures, etc.
These losses could be major hazards if they could lead to a release. For
example, loss of cooling could lead to an increase in pressure and failure
of a vessel or pipe, and a loss of heating or power could lead to unstable
processes. These conditions are less likely to be major hazards for
substances handled at atmospheric temperatures and pressures.
Report earthquakes as a major hazard only if there is a great enough risk
of their occurring at your site that you plan and design for them.
Report floods as a major hazard only if there is a great enough risk of
their occurring at your site that you plan and design for them.
Report tornadoes as a major hazard only if there is a great enough risk of
their occurring at your site that you plan and design for them.
Report hurricanes as a major hazard only if there is a great enough risk
of their occurring at your site that you plan and design for them.
Specify any other major hazards not listed above.
        7.4.e. Process controls in use (select at least one). All of the process controls used on the process
        or part of the process.  Process controls are equipment and associated procedures used to prevent
        or limit releases and are described below.  If none are applicable, check "none."
7.4.e. Process Controls
1. Vents
2. Relief valves
3. Check valves
4. Scrubbers
5. Flares
6. Manual shutoffs
Description
An opening provided for the discharge of pressure or release of
pressure from tanks, vessels, or processing equipment.
A valve that relieves pressure beyond a specified limit and recloses
upon return to normal operating pressure.
A device for automatically limiting the flow in a piping system to a
single direction.
A pre-release protection measure that uses water or aqueous mixtures
containing scrubbing reagents to remove discharging liquids and may
treat the discharging chemical.
A pre-release protection measure used for flammable gases and
vapors to remove and possibly treat discharged liquids.
Manual controls of the shutoff flow to a pipe or vessel.
RMP* Submit User Manual February 1999
Ch. 2Pg. 41

-------
7.4.e. Process Controls
7. Automatic shutoffs
8. Interlocks
9. Alarms and procedures
10. Keyed bypass
11. Emergency air supply
12. Emergency power
13. Backup pump
14. Grounding equipment
15. Inhibitor addition
16. Rupture disks
17. Excess flow device
18. Quench system
19. Purge system
20. None
21. Other
Description
Controls the shutoff flow to a pipe or vessel and are triggered
automatically when process conditions are exceeded.
A switch or other device that prevents activation of a piece of
equipment when a protective door is open or some other hazard
exists.
Systems that trigger a warning device after the occurrence of a
hazardous condition and procedures to activate an alarm system.
A bypass system that is activated by a control signal.
A backup system to provide air to a process when the regular air
supply fails.
Backup power systems.
A secondary pump intended to serve the same function as the primary
pump if the primary pump fails.
Devices that ground electrical equipment to avoid explosions.
A substance that is added to a reaction that is capable of stopping or
retarding a chemical reaction.
A device that relieves pressure beyond a specified limit.
Flow-limiting equipment that protects downstream equipment from
surges.
A system that cools by removing excess heat or immersing liquid into
a cooling medium.
A system that replaces the atmosphere in a container with an inert
substance to prevent the formations of an explosive mixture.
None are applicable.
Specify any other process controls that you may use on your process
and that are not specified above.
RMP* Submit User Manual February 1999
Ch. 2 Pg. 42

-------
        7.4.f. Mitigation systems in use (select at least one).  All of the mitigation systems you have in
        place to control a release from the process or part of the process.  Mitigation systems are described
        below.  If none are applicable, check "none."
7.4.f. Mitigation Systems
1. Sprinkler systems
2. Dikes
3. Fire walls
4. Blast walls
5. Deluge system
6. Water curtain
7. Enclosure
8. Neutralization
9. None
10. Other
Description
A system for protecting a building against a fire by means of
overhead pipes that release an extinguishing material through heat
activated outlets.
A low wall that acts as a barrier to prevent a spill from spreading.
A wall constructed to prevent the spread of fire.
A heavy wall used to isolate buildings or areas that contain highly
combustible or explosive materials.
A system to overflow an area with a release of water or other
extinguishing fluid.
A spray of water from a horizontal pipe through nozzles. The
curtain may be activated manually or automatically.
Something that facilitates the physical containment of a release
within a structure (e.g., a building).
Controlling a release by neutralizing the released chemical.
None are applicable.
Specify any other mitigation systems you may have in place on your
process and that are not listed above.
        7.4.g. Monitoring/detection systems in use (select at least one).  All of the monitoring and
        detection systems you have installed to detect a release of a regulated substance from the process
        or part of the process. Monitoring and detection systems are described below.  If none are
        applicable, check "none."
7.4.g. Monitoring & Detection
Systems
1. Process area detectors
2. Perimeter monitors
3. None
4. Other
Description
Detection systems located on or close to process equipment.
Detection systems include indicator tubes, and chromatographic,
spectrometric, electrochemical, and colorimetric gas analysis.
Integrated detection networks at the source boundary. Detection
systems can include fluorescent SO2 analyzers, photoelectric tape
sensors, or electrolytic chlorine detectors.
None are applicable.
Specify any other monitoring and detection systems you have in place
and that are not listed above.
RMP* Submit User Manual February 1999
Ch. 2 Pg. 43

-------
        7.4.h. Changes since last PHA or PHA update (select at least one). All of the changes made to
        the process or part of the process since the last PHA. If none are applicable, check "none."
7.4.h. Changes Since Last
PHA or PHA Update
1. Reduction in chemical
inventory
2. Increase in chemical
inventory
3. Change in process
parameters
4. Installation of process
controls
5. Installation of process
detection systems
6. Installation of perimeter
monitoring systems
7. Installation of mitigation
systems
8. None recommended
9. None
10. Other
Description
A decrease in the quantity of regulated substances stored on-site.
An increase in the quantity of regulated substances stored on-site.
Examples of changes in process parameters include an increase or
decrease in temperature, pressure, flow rates, etc.
The addition of controls such as those described in 7.4.e.
The addition of systems such as those described in 7.4.g.
The addition of systems such as those described in 7.4.g.
The addition of systems such as those described in 7.4.f
Select "none" if the PHA team did not recommend any changes to the
process.
None are applicable.
Specify any other changes made to the process since the last PHA
that are not listed above.
7.5. Date of most recent review or revision of operating procedures.  The operating procedures
requirements for Program 3 processes can be found at 40 CFR §68.69. For your first RMP submission,
enter the date you complied with the requirement of §68.69(a) (develop and implement written procedures)
for the process or the date you last reviewed or revised the operating procedures, whichever is later. (As
explained in the introduction to Section 7, the date you enter may depend on whether you are subject to the
same or similar requirement under other federal or state laws.) For subsequent RMPs, enter the date of the
most recent review or revision of the operating procedures.  Operating procedures may be reviewed or
revised as a result of, among other things, a change to the process (see §§68.69(c) and 68.75(e)), annual
certification of the operating procedures (see 68.69(c)), or a periodic audit of the prevention program (see
§68.79(a)).
RMP* Submit User Manual February 1999
Ch. 2 Pg. 44

-------
7.6. Training.  The training requirements for Program 3 processes can be found at 40 CFR §68.71.
       7.6.a. Date of most recent review or revision of training programs. For your first RMP
       submission, enter the date you ensured that the training you provide the employees operating the
       process meets the requirements of §68.71 (a), or the date you last reviewed or revised your training
       programs, whichever is later. (As explained in the introduction to Section 7, the date you enter
       may depend on whether you are subject to the same or similar requirement under other federal or
       state laws.)  For subsequent RMPs, enter the date of the most recent review or revision of the
       training you provide. Training programs may be reviewed or revised as a result of, among other
       things, a change to the process (see § 68.75(c)) or a periodic audit of the prevention program (see
       §68.79(a)).  If the training was not reviewed or revised since the previous RMP was submitted,
       reenter the date provided in the previous RMP.

       7.6.b. Type of training provided (select at least one).
             1. Classroom
             2. On the job
             3. Other (specify)

       7.6.c. Type  of competency testing used (select at least one).  Identify how employees were tested
       to determine and evaluate comprehension of the training materials.
             1. Written test
             2. Oral test
             3. Demonstration
             4. Observation
             5. Other (specify)

7.7. Maintenance. The maintenance requirements for Program 3 processes can be found at 40 CFR
§68.73.  Enter the  following:
       7.7.a. The date that you most recently reviewed or revised the maintenance procedures. For
       your first RMP submission, enter the date you complied with the requirements of §68.73(b)
       (establish  and implement written maintenance procedures) for the process, or the date you last
       reviewed or revised the maintenance procedures, whichever is later. (As explained in the
       introduction to Section 7, the date you enter may depend on whether you are subject to the same or
       similar requirement under other federal or state laws.)  For subsequent RMPs, enter the date of the
       most recent review or revision of the maintenance procedures. Maintenance procedures may be
       reviewed or revised as a result of, among other things, a change to the process (see § 68.75(c)) or a
       periodic audit of the prevention program (see §68.79(a)). If the procedures were not reviewed or
       revised  since the previous RMP was submitted, reenter the date provided in the previous RMP.
       7.7.b. The date of the most recent equipment inspection or test
       7.7.c. The equipment that were inspected or tested  (list equipment).

7.8. Management of change. The management of change requirements for Program 3 processes can be
found at 40 CFR §68.75. Enter the following:
       7.8.a. The date of the most recent change (if any) that triggered the management of change
       procedure.
       7.8.b. The date that you most recently reviewed or revised the management of change
       procedures at your site.  For your first RMP submission, enter the date you complied with the
       requirements of 68.75(a) (establish and implement written procedures) for the process, or the date
       you last reviewed or revised the management of change procedures, whichever is later. (As

RMP* Submit User Manual February 1999                                                  Ch. 2 Pg.  45

-------
       explained in the introduction to Section 7, the date you enter may depend on whether you are
       subject to the same or similar requirement under other federal or state laws.) For subsequent
       RMPs, enter the date of the most recent review or revision of the procedures. Management of
       change procedures may be reviewed or revised as a result of, among other things, a periodic audit
       of the prevention program (see §68.79(a)). If the procedures were not reviewed or revised since the
       previous RMP was submitted, reenter the date provided in the previous RMP.

7.9. Date of most recent pre-startup  review.  The pre-startup review requirements for Program 3
processes can be found at 40 CFR §68.77. Enter the date of the most recent pre-startup review (if any)  for
this process.

7.10. Compliance audits.  The compliance audit requirements for Program 3 processes can be found at 40
CFR §68.79.  If you did not conduct a compliance audit prior to submitting your first RMP (you are not
required to do so), leave these fields blank.
       7.10.a. Date of most recent compliance audit
       7.10.b. Expected or actual date of completion of all changes resulting from the compliance
       audit. This may be left blank if there were no changes.

7.11. Incident investigation. The incident investigation requirements for Program 3 processes can be
found at 40 CFR §68.81. Enter the following:
       7.11.a. Date of your most recent incident investigation (if any).  If you have not had an incident
       investigation, leave this field blank.
       7.1 l.b. The expected or actual date of completion of all changes resulting from the incident
       investigation. This may be blank if there were no changes.

7.12.  Date of most recent review or revision of employee participation plans. The employee
participation requirements for Program 3 processes can be found at 40 CFR §68.83. For your first RMP
submission, enter the date you complied with the  requirements of §68.83(a) (develop a written plan) for the
process, or the date you last reviewed or revised the employee participation plans, whichever is later. (As
explained in the introduction to Section 7, the date you enter may depend on whether you are subject to  the
same or similar requirement under other federal or state laws.) For subsequent RMPs, enter the  date of the
most recent review or revision of the plan.  Employee participation plans may be reviewed or revised as a
result of, among other things, a periodic audit of the prevention program (see §68.79(a)).  If the plan was
not reviewed or revised since the previous RMP was submitted, reenter the date provided in the previous
RMP.

7.13.  Date of most recent review or revision of hot work permit procedures.  The hot work permit
requirements for Program 3 processes can be found at 40 CFR §68.85.  For your first RMP submission,
enter the date you complied  with the requirement of §68.85 for the process or the date you last reviewed or
revised the hot work permit procedures, whichever is later.  (As explained in the introduction to Section 7,
the date you enter may depend on whether you are subject to the same or similar requirement under other
federal or state laws.) For subsequent RMPs, enter the date of the most recent review or revision of your
hot work permit procedures.  Hot work permit procedures may be reviewed or revised as a result of, among
other things, a periodic audit of the prevention program (see §68.79(a)). If the procedures were not
reviewed or revised since the previous RMP was  submitted, reenter the date provided in the previous RMP.
RMP* Submit User Manual February 1999                                                   Ch. 2 Pg. 46

-------
7.14.  Date of most recent review or revision of contractor safety procedures.  The contractor safety
requirements for Program 3 processes can be found at 40 CFR §68.87. Leave this field blank if you do not
have any contractors. Otherwise, for your first RMP submission, enter the date you complied with the
requirements of §68.87(b)(4) (develop and implement safe work practices for contractors) for the process,
or the date you last reviewed or revised the contractor safety procedures, whichever is later.  (As explained
in the introduction to Section 7, the date you enter may depend on whether you are subject to the same or
similar requirement under other federal or state laws.)  For subsequent RMPs, enter the date of the most
recent review or revision of the procedures.  Contractor safety procedures may be reviewed or revised as a
result of, among other things, a change to the process (see §68.75(c)) or a periodic audit of the prevention
program (see §68.79(a)). If the procedures were not reviewed or revised since the previous RMP was
submitted, reenter the date provided in the previous RMP.

7.15.  Date of most recent evaluation of contractor safety performance.  Leave this field blank if you do
not have any contractors or have not yet evaluated contractor performance. Otherwise, enter the date of
your most recent evaluation of contractor safety performance.  If you have more than one contractor
involved in operating or maintaining the process, enter the date you completed your evaluations of all the
contractors.
RMP* Submit User Manual February 1999                                                   Ch. 2 Pg. 47

-------
SECTION 8:   PREVENTION PROGRAM FOR PROGRAM 2 PROCESSES
Complete this section for each prevention program you report.

Prevention program description. If different safeguards apply to different units in your process, use this
field to explain how the prevention program for the process relates to the different units in the process. For
example, "This process includes three interconnected production units, A, B, and C. Everything in this
prevention program applies to all three units, with the following exceptions:
- The dates of the hazard review, which are 01/02/97, 6/5/96 and 4/3/96 for units A, B and C, respectively.
- Production unit A uses only a scrubber as a process control, while units B and C have relief valves and
scrubbers.
- The water curtain indicated as a mitigation measure applies only to production unit C."

If you have so many "exceptions" that it gets too complicated to explain as above, but you still have many
common data elements, you can report your prevention program on a unit-by-unit basis. To simplify such
reporting, you can use the autocopy feature in RMP* Submit so that you only have to enter the common
data elements once. First, enter the common elements into RMP* Submit (or the paper form, if you are
submitting in paper), then hit the COPY function at the bottom of the screen to copy that information to
another prevention program "record" (if you are submitting in paper, photocopy the pages). To complete
the prevention program record for each unit, enter the remaining data which is unique to each.

8.1. NAICS code for the process. Enter the NAICS code that most closely corresponds to the process; it
will not necessarily be the same NAICS code for your facility as a whole. The NAICS code that you
choose must be one that you've already entered in the Registration Section for the covered process. If you
have two processes with the same NAICS code, explain in the above description field which of the two
processes this prevention program relates to. RMP* Submit will produce a list of the NAICS codes that
you have already entered for your registered processes as a pick list for this data element. As described in
the Registration section of this manual, the NAICS code  system classifies businesses by type using
descriptive categories that correspond to five-digit or six-digit codes.

8.2. Chemical name(s).  For each prevention program, provide the names of all regulated substances held
above the threshold in the covered units. If you have an NFPA-4 flammable mixture containing regulated
flammables, you may list it as a "flammable mixture" and list all of the regulated substances contained in
the mixture.

8.3. Safety information.  The safety information requirements for Program 2 processes can be found at 40
CFR §68.48. Enter the following:

8.3.a. The date that you most recently reviewed or revised the safety information. For your first RMP
submission, enter the date you complied with the safety information requirements of §68.48(a) (compile
safety information) for the process, or the date you last reviewed or revised the safety information,
whichever is later.  (As explained in the introduction to Section 7, the date you enter may depend on
whether you are subject to the same or similar requirement under other federal or state laws.)  For
subsequent RMPs,  enter the date the information was most recently reviewed or revised. Safety
information may be reviewed or revised as a result of, among other things, a major change to the process
(see  §68.48(c)) or a periodic audit of the prevention program (see §68.58(a)).  If the safety information
RMP* Submit User Manual February 1999                                                   Ch. 2 Pg. 48

-------
was not reviewed or revised since the previous RMP was submitted, reenter the date provided in the
previous RMP.

8.3.b. Federal or state regulations or industry-specific design codes and standards used to
demonstrate compliance with the safety information requirement (select at least one). Are you subject
to any of the following Federal or state regulations? Do you use any of the following industry-specific
design codes and standards to demonstrate compliance with the safety information requirement? If none
are applicable, check "none."
        8.3.b.l. NFPA 58 (or state law based on NFPA 58). - NFPA stands for National Fire Protection
        Association; NFPA 58 is a propane (LP gas) handling code. Note that state propane laws are
        generally based on NFPA 58. Select "NFPA 58" if your process is subject to a state or local law
        based on NFPA 58 or if you follow NFPA 58 in any event.

        8.3.b.2. OSHA (29 CFR 1910.111) - OSHA's rule for operations handling anhydrous ammonia.
        Select "29 CFR 1910.111" if your process is subject to this rule.

        8.3.b.3. ASTM Standards - Select this if you follow American Society of Testing Materials
        standards. ASTM establishes standards for materials, products, systems, test methods,
        specifications, classifications, definitions, and recommended practices.

        8.3.b.4. ANSI Standards - Select this if you follow American National Standards Institute
        standards. ANSI nationally coordinates voluntary standards. ANSI standards cover areas as
        definitions, terminology, symbols, and abbreviations; materials, performance characteristics,
        procedure, and methods of rating; methods of testing and analysis; size, weight, and volume,
        safety, health, and building construction.

        8.3.b.5. ASME Standards - Select this if you follow American Society of Mechanical Engineers
        standards. ASME conducts research and develops boiler, pressure vessel, and power test codes.  It
        also develops safety codes and standards for equipment.

        8.3.b.6. None - If your facility does not apply to the Program 2 process any national standards
        such as those noted above, and is not subject to any federal or state rules or laws such as those
        noted above, select "none."

        8.3.b.7. Other (specify) - If you apply any other standards to your process safety equipment,
        select "other" and specify the standards you apply.  Some examples of other standards include the
        National Electrical Manufacturers Association (NEMA) standards and the American Petroleum
        Institute (API) standards. There may also be other codes that apply.

        8.3.b.8. Comments - In this section, please explain how federal, state or local regulations or
        industry-specific design codes and standards are being used to demonstrate compliance with the
        safety  information requirement.
RMP* Submit User Manual February 1999                                                   Ch. 2 Pg. 49

-------
8.4. Hazard Review.  The hazard review requirements for Program 2 processes can be found at 40 CFR
§68.50. Enter the following:

       8.4.a. The date of completion of the most recent hazard review or update (must be within the
       five years prior to submission of the RMP).

       8.4.b.  The expected or actual date of completion of all changes resulting from the hazard
       review. This may be blank if there were no changes.

       8.4.c. Major hazards identified (select at least one). All major hazards that were identified for
       the Program 2 process or part of the process at your facility as a result of the hazard review.
       Major hazards are  described in 7.4.d.

       8.4.d. Process controls in use (select at least one). All of the process controls used on the
       Program 2 process or part of the process. Process controls are equipment and procedures used to
       prevent or limit releases. Process controls are described in 7.4.e. If none are applicable, check
       "none."

       8.4.e. Mitigation systems in use (select at least one).  All of the mitigation systems you have in
       place to control a release should one occur from the Program 2 process or part of the process.
       Mitigation systems are described in 7.4.f If none are applicable, check "none."

       8.4.f. Monitoring/detection systems in use (select at least one). All of the monitoring and
       detection systems installed to detect a release of a regulated substance from the Program 2 process
       or part of the process. Monitoring and detection systems are described in 7.4.g.  If none are
       applicable, check "none."

       8.4.g. Changes since last hazard review or hazard review update (select at least one). All of
       the changes made to the process or part of the Program 2 process since the last hazard review.
       Hazard review changes are described in 7.4.h. If none are applicable, check "none."

8.5. Date of most recent review or revision of operating procedures.  The operating procedures
requirements for Program 2 processes can be found in the RMP regulation at 40 CFR §68.52.  For your
first RMP submission, enter the date you complied with the requirements of §68.52(a) (prepare written
procedures) for the process, or the date you last reviewed or revised the operating procedures, whichever is
later.  (As explained in the introduction to Section 7, the date you enter may depend on whether you are
subject to the same or similar requirement under other federal or state  laws.) For subsequent RMPs, enter
the date of the most recent review or revision of the operating procedures.  Operating procedures may be
reviewed or revised as a result of, among other things, a major change to the process (see §68.52(c)) or a
periodic audit of the prevention program (see §68.58(a)).  (See Chapter 7 of the General Guidance for
Risk Management Programs for a discussion of what constitutes a major change.) If the operating
procedures were not reviewed or revised since the previous RMP was submitted, reenter the date provided
in the previous RMP.
RMP* Submit User Manual February 1999                                                   Ch. 2 Pg. 50

-------
8.6. Training. Training requirements for Program 2 processes can be found at 40 CFR §68.54.  Enter the
following:
       8.6.a. Date of most recent review or revision of training programs. For your first RMP
       submission, enter the date you complied with the requirements of §68.54(a) (training) for the
       process, or the date you last reviewed or revised the training programs, whichever is later.  (As
       explained in the introduction to Section 7, the date you enter may depend on whether you are
       subject to the same or similar requirement under other federal or state laws.)  For subsequent
       RMPs, enter the date of the most recent review or revision of the training you provide. Training
       programs may be reviewed or revised as a result of, among other things, a major change  to the
       process (see § 68.54(d)) or a periodic audit of the prevention program (see §68.58(a)). If the
       training was not reviewed or revised since the previous RMP was submitted, reenter the date
       provided in the previous RMP.

       8.6.b. Type of training provided (select at least one).
              1.  Classroom
              2.  On the job
              3.  Other (specify)

       8.6.c. Type of competency testing used (select at least one). Identify how employees were tested
       to determine and evaluate comprehension of the training materials.
              1.  Written test
              2.  Oral test
              3.  Demonstration
              4.  Observation
              5.  Other (specify)

8.7. Maintenance. The maintenance requirements for Program 2 processes can be found at 40 CFR
§68.56.  Enter the following:
       8.7.a. The date that you most recently reviewed or revised the maintenance procedures. For
       your first RMP submission, enter the date you complied with the requirements of §68.56(a)
       (prepare and implement maintenance procedures) for the process, or the date you last reviewed or
       revised the maintenance procedures, whichever is later.  (As explained in the introduction to
       Section 7, the date you enter may depend on whether you are subject to the same or similar
       requirement under other federal or state laws.)  For subsequent RMPs, enter the date of the most
       recent review or revision of the maintenance procedures.  Maintenance procedures may be
       reviewed or revised as a result of, among other things, a major change to the process (see
       §68.56(a)) or a periodic audit of the prevention program (see §68.58(a)). If the procedures were
       not reviewed  or revised since the previous RMP was submitted,  reenter the date provided in the
       previous RMP.
       8.7.b. The date of the most recent equipment inspection or test
       8.7.c. The equipment that were inspected or tested (list equipment).

8.8. Compliance Audits.  The compliance audit requirements for Program 2 processes can be  40 CFR
§68.58.  If you did conduct a compliance audit prior to submitting your  first RMP (you are not required to
do so), leave these fields blank.
       8.8.a. The date of your most recent compliance audit.
       8.8.b. The expected or actual date of completion of all changes resulting from the compliance
       audit. This may be blank if there were no changes.

RMP* Submit User Manual February 1999                                                  Ch. 2 Pg. 51

-------
8.9. Incident Investigation.  The incident investigation requirements for Program 2 processes can be found
at 40 CFR §68.60. Enter the following:
       8.9.a. The date of your most recent incident investigation (if any).  If you have not had an
       incident investigation, leave this field blank.
       8.9.b. The expected or actual date of completion of all changes resulting from the incident
       investigation. This may be blank if there were no changes.

8.10.  Date of most recent change that triggered review or revision. Enter the date of the most recent
change that triggered a review or a revision of safety information, the hazard review, operating or
maintenance procedures, or training.
RMP* Submit User Manual February 1999                                                   Ch. 2 Pg. 52

-------
SECTION 9:   EMERGENCY RESPONSE PROGRAM
Complete this section once for all covered processes.

The extent to which you need to fill out this portion of the RMP depends on whether your employees will
respond to releases of regulated substances at your facility. Under §68.90(b), if your employees will not
respond to releases, you are not required to comply with the requirements for an emergency response
program provided you meet the following criteria: (1) if you hold one or more regulated toxic substances
over threshold quantities, your facility must be included in the community emergency response plan
developed under the Emergency Planning and Community Right-to-Know Act (EPCRA); (2) if you hold
only one or more regulated flammable substances over threshold quantities, you must have coordinated
response actions with the local fire department; and (3) you must have appropriate mechanisms in place to
notify emergency responders when there is a need for a response.

If your employees will respond to releases of regulated substances at your facility, you are subject to
§68.95 and must fill out all the data items in this section of the RMP. If your employees will not respond
to releases of regulated substances at your facility, you need only respond to the first two (9.1.a & 9.1.b)
and last three (9.7.a, 9.7.b, & 9.8) emergency response data elements.

9.1.   Written emergency response (ER) plan

9.1.a. Is your facility included in the community emergency response plan? If your facility is subject to
part 68 because it has one or more regulated toxic substances above threshold quantities,  it is probably
included in a local emergency response plan under the Emergency Planning and Community Right-to-Know
Act (EPCRA).  Under §303 of EPCRA, local emergency planning committees (LEPCs) must prepare an
emergency  response plan for facilities in their planning district having toxic substances listed under
EPCRA §302 in excess of the threshold planning quantity established under that section.  Most of the toxic
substances listed in part 68 are also listed under EPCRA §302, and the EPCRA thresholds for those
substances are generally the same or lower than the part 68 thresholds for the same substances.
Consequently, part 68 facilities with toxic substances listed under both EPCRA and part 68 should be
included in community emergency response plans.

In addition, facilities subject to part 68 as a result of flammable substances may also be covered by
community emergency response plans, since LEPCs can, and sometimes do, include other hazardous
substances, including  flammables, in their plans. If you are not sure whether your facility is included in
your community's local emergency plan, check with your LEPC.

As noted above, if your employees are not going to respond to releases of regulated substances at your
facility and you have  one or more part 68 regulated toxic  substances over threshold quantities, your facility
must be included in the local emergency response place under EPCRA.

Check this question if your facility is included in the community's emergency response plan.

9.1.b. Does your facility have its own written emergency response plan? Check this question if you
have a response plan (not just an emergency action plan as required by OSHA under 29 CFR 1910.38).
RMP*Submit User Manual February 1999                                                  Ch. 2 Pg. 53

-------
9.2. Does your facility's ER plan include specific actions to be taken in response to accidental releases
of regulated substance(s)?
9.3. Does your facility's ER plan include procedures for informing the public and local agencies
responding to accidental releases?
9.4. Does your facility's ER plan include information on emergency health care?
These data elements (9.2, 9.3, 9.4) reflect the three mandatory components of the emergency response plan
required under §68.95(a)(l). For an emergency response plan to be in compliance with this requirement,
you must be able to answer "yes" to each of these questions.

9.5. Date of most recent review or update of your facility's ER plan.
Indicate the date on which you most recently reviewed or updated your plan.  Section 68.95(a)(4) requires
that ER plans be reviewed and updated "as appropriate" to reflect changes at the facility and to ensure that
employees are informed of changes.

9.6. Date of the most recent ER training for your facility's employees.
Indicate the date of the most recent emergency response training at your facility.  Emergency response
training includes drills involving your personnel with or without outside emergency response agencies and
tabletop exercises of your emergency response plan.  Single purpose drills (e.g., alarm system drills) may
be listed, but exercises that test more aspects of the plan are preferable.

Part 68 does not specify a schedule for conducting employee response training. You should note, however,
that other planning requirements (e.g., HAZWOPER) may establish a more formal  schedule for conducting
training (e.g., eight hours of annual refresher training).

9.7.a-b. Local agency with which your facility's ER plan or response actions are coordinated. If you
have an ER plan, indicate the name and phone number of the agency with whom you have coordinated your
plan.  Section 68.95(c) requires that a facility's ER plan be coordinated with the community emergency
response plan under EPCRA for the facility's community.  The LEPC for the facility's community will
typically be the agency with which ER plans are coordinated.

If you do not have an ER plan, indicate the agency with which you have coordinated response activities.
As noted above, §68.90(b) provides that if you have regulated toxic substances and your employees will
not be responding to releases of those substances, your facility must be included in the community
emergency response plan developed by the LEPC for your community. If that is the case for your facility,
indicate the name  and phone number of your LEPC here. If you have only regulated flammable substances
and your employees will not be responding to releases of those substances, you must have coordinated
response actions with the local fire department. If that is case for your facility, indicate the name and
phone number of your local fire department here.
RMP* Submit User Manual February 1999                                                   Ch. 2 Pg. 54

-------
9.8. What other Federal or State emergency plan requirements is the facility subject to? Indicate all
of the federal and state emergency response regulations or statutes to which your facility is subject.  Select
at least one. All RMP facilities are subject to OSHA emergency planning requirements at either 29 CFR
1910.38 or 29 CFR 1910.120.

       a. OSHA Regulations at 29 CFR 1910.38. These are OSHA's Emergency Action Plan
       regulations. All RMP facilities are subject to either these OSF£A regulations or OSF£A regulations
       at 29 CFR 1910.120.
       b. OSHA Regulations at 29 CFR 1910.120. These are OSHA's Hazardous Waste Operations
       and Emergency Response (HAZWOPER) Plan regulations.  All RMP facilities are subject to either
       these OSHA regulations or OSHA regulations at 29 CFR 1910.38.

       c. Clean Water Act Regulations at 40 CFR 112. These are EPA's Oil Spill Prevention Control
       and Countermeasures (SPCC) regulations under the Clean Water Act.

       d. RCRA Regulations at 40 CFR 264, 265, and 279.52. These are EPA's permitting regulations
       for solid waste under the Resource Conservation and Recovery Act (RCRA).

       e. OPA 90 Regulations at 40 CFR 112, 33 CFR 154, 49 CFR 194, or 30 CFR 254. These are
       EPA, U.S. Coast Guard, Department of Transportation, and Department of the Interior facility
       response plan regulations under the Oil Pollution Act of 1990 (OPA 90).

       f. State EPCRA Rules or Laws. These are state emergency planning and community right-to-
       know (EPCRA) laws.  Federal EPCRA does not require facility response plans, but some state
       laws may.

       g. Other. Specify any other emergency response regulations or laws to which your facility is
       subject.
RMP*Submit User Manual February 1999                                                  Ch. 2 Pg. 55

-------

-------
3.     GETTING READY TO SUBMIT

       A. TO HELP ANSWER YOUR QUESTIONS...
       For RMP policy interpretations and questions on specific data elements, call the Hotline at (800)
       424-9346 or (703) 412-9810.

       For answers to software questions or solutions to installation problems, contact the RMP
       Reporting Center at (703) 816-4434 (8am-4:30pm M-F) or via e-mail at:
       userrmp .usersupport@epcra. org.

       B. WHEN is MY RMP DUE?
       Your RMP is due no later than the latest of the following dates:
              June 21,1999;
              The date on which a regulated substance is first present above  a threshold quantity in a
              process at your facility; or
              Three years after the date on which a substance at your facility is first listed by EPA.

       The postmark date will be used to determine whether you have submitted your RMP by the
       applicable due date and your 5-year anniversary date (§68.190 requires that your RMP be updated
       at least every five years).  The RMP Reporting Center will record both the postmark date and the
       date your RMP was received. If the postmark date  is illegible, the postmark date will be left blank
       and the date received will be used for purposes of determining compliance with the requirement to
       submit the RMP by the due date. Both "postmark date" and "date received" will be viewable in
       RMP* Info.

       C. CAN I SUBMIT MY RMP BEFORE THE JUNE 21, 1999, DEADLINE?
       RMP* Submit and the RMP paper form will  be available January 4, 1999. You may submit your
       RMP any time after January 4, 1999. Your next RMP update will be due no later than 5 years
       from the postmark date of your last submission, even if you submit months prior to the June 21,
       1999 deadline. RMPs will be posted to RMP*Info  as they are received.

       D. ELECTRONIC WAIVER - FORM AND INSTRUCTIONS.
       Submit your RMP electronically on diskette.  If you are unable to submit on diskette, you may use
       the paper form (provided in Appendix A).  If you use the paper form, complete the Electronic
       Waiver Form (Appendix B) and submit it with your RMP.

       E. SUBMITTING A "COMPLETE" RMP.
       One advantage of submitting electronically (using RMP* Submit or a commercial RMP software
       package) is that you will be able to check whether your RMP is  "complete" in the sense that you
       have provided information for the RMP data elements that every facility must complete. Using
       RMP* Submit, you can run the CHECK function (from the RMP List screen) to verify the
       "completeness" of your RMP at any time.  The CHECK function will create an Error Report if
       your RMP is "incomplete." It is important to note,  however, that the "completeness" check
       provided by RMP*Submit is not a compliance check. It will not indicate whether your RMP meets
       all applicable part 68 requirements; it will only indicate that you have provided the right type of
       information for those data elements that every facility submitting an RMP must at a minimum
       complete.  RMP* Submit cannot discern if you have provided correct information or if you should
       have completed data elements in addition to those required of every facility.

RMP* Submit User Manual February 1999                                                  Ch. 3 Pg. 1

-------
       Consequently, you should not rely on RMP* Submit's "completeness" check to determine whether
       your RMP fully complies with the requirements of part 68.

       When you are ready to submit your RMP, run the SUBMIT function (from the RMP List screen)
       to create your ASCII file for submission.  RMP* Submit will once again run the validation program
       to check for "completeness."

       If you used a commercial RMP software program, you can still use RMP* Submit to verify the
       "completeness" of your RMP. RMP*Submit can import an RMP ASCII file. Once a new ASCII
       file is imported, run the CHECK function to verify the "completeness." RMP* Submit will
       produce an Error Report if it detects that the RMP is not "complete" or that it contains any of the
       following errors:

           1) Data elements which are needed for ASCII file generation have not been completed.
           RMPs that are missing the following data elements will not generate the ASCII file for
           submission:
           —Facility name and address;
           -For each process (section 1): program level, chemical name, CAS # and NAICS code;
           —For each OCA section (sections 2-5): chemical name;
           -For each Accident History (section 6): chemical name, CAS #, & date;
           —For each Prevention Program (sections 7-8): NAICS, chemical name, CAS #.

           2) Data elements which do not meet specific "validation" criteria. All data elements
           required for an RMP to be "complete" must contain a response that is appropriate for the kind
           of information requested or RMP* Submit will generate an Error Report. For example, all date
           fields must contain a 2-digit month between 01 and 12, a 2-digit day between 01 and 31, and a
           4-digit year (MM/DD/YYYY).  RMP* Submit will not indicate whether the date or other
           information provided is correct or meets regulatory requirements.

           3) Data elements are inconsistent across sections of the RMP. For example, for every toxic
           chemical reported in the registration section for Programs 2 and 3, there must be a toxic
           alternative release scenario reported.

       Errors generated in #2 & #3 above will still generate the ASCII file for submission.  Therefore,
       you can choose to submit an RMP that is  "incomplete," meaning it contains errors.  However, if
       you submit an "incomplete"  RMP, you  will not be in compliance with the part 68 requirement to
       submit a RMP meeting all applicable regulatory requirements by the applicable due date.

       The Reporting Center will process all RMPs using the same validation program found in
       RMP* Submit. If any of the  fields needed for ASCII file generation are missing (which you will
       know if you use RMP* Submit), the Center will be unable to process your RMP and you will be so
       notified. If any other errors  (like those in #2 & #3 above) are detected, an Error Report will be
       generated and the RMP will be marked as "incomplete."  Both "complete" and "incomplete" RMPs
       will be posted on RMP* Info; those that are incomplete will include their Error Report. A copy of
       any Error Report generated for your RMP will be mailed to you with your notification letter.  A
       list of RMPs that cannot be processed will also be posted  on the Internet.
RMP* Submit User Manual February 1999                                                   Ch. 3 Pg. 2

-------
       In addition to missing required fields, an RMP submitted on diskette will be unable to be processed
       for the following reasons:
               -There is a virus on the diskette you submitted that could not be removed at our Reporting
               Center.

               —The submitted diskette, or the ASCII file on the diskette you submitted, is unreadable.

               —More than one Risk Management Plan was reported in a single submission.

       F. CERTIFICATION.
       Part 68 specifies that a signed certification statement must be sent with each RMP:	
        68.185  Certification.
               (a) For Program 1 processes, the owner or operator shall submit in the RMP the
               certification statement provided in § 68.12(b)(4) of this part.

               (b) For all other covered processes, the owner or operator shall submit in the RMP a
               single certification that, to the best of the signer's knowledge, information, and belief
               formed after reasonable inquiry, the information submitted is true, accurate, and
               complete.
       The certification statement must be signed by the owner or operator or a senior official with
       management responsibility for the person (or persons) completing the RMP. The owner, operator,
       or official must certify the accuracy and completeness of the RMP by signing and dating the
       certification statement. The statement applies to all the information supplied in the RMP and
       should be signed only after the form is complete. The name and title of the person signing the
       statement should be printed or typed on the certification. The certification statement submitted
       must bear the original signature of the person making the certification.

       Sample certification letters are provided in Appendix C. In addition, RMP*Submit contains the
       text of the sample letters under the "Main Menu," -> "Tools," -> "Edit Certification Letters."
       You can cut and paste this text into your own word processing package to finalize and print the
       letter.

       G. HOW TO LABEL YOUR SUBMISSION DISKETTE.
       You must attach a label to each diskette (not the diskette's jacket). The label must be typed or
       legibly handwritten. A sample label with the necessary information is shown below. The types of
       packaging and shipping to use for submitting diskettes are left to your discretion.
RMP
Facility
Name
Date: 6/1/1999
Contact

DiskJ_of J_
: RMP Contact Name &
Phone Number
RMP* Submit User Manual February 1999
Ch. 3 Pg. 3

-------
       H. HOW TO ASSEMBLE YOUR COMPLETE RMP SUBMISSION PACKAGE.
       Your package must include at least two items:
               1. The RMP submitted on a diskette using either RMP* Submit or a commercial RMP
               software product in the required format, unless you do not have the capability to submit
               electronically. If you do not have the capability to submit electronically, you may submit
               your RMP using the RMP paper form, staple all the pages together and include a signed
               electronic waiver form (Appendix B). Include only 1 RMP on each diskette or form.

               2. A certification statement for the entire RMP, signed (with an original signature) and
               dated.

       Submit only 1 RMP and accompanying certification statement per envelope to ensure that the
       certification statement is applied to the appropriate RMP. If you are claiming CBI, additional
       items are requires; see Chapter 4: Submitting CBI & Trade Secrets for more information. Do not
       send other correspondence with your RMP.

       If you have implementation questions, please contact your Implementing Agency. See Appendix G
       for a list of all State contacts.  If your State is not listed in Appendix G, call your EPA Regional
       Office.  See Appendix H for a list of EPA Regional contacts.

       i. WHERE TO SEND COMPLETED RMP REPORTS:
       Send reports by regular mail to:
               RMP Reporting Center
               P.O.  Box 3346
               Merrifield, VA 22116-3346
               Attention: Risk Management Plans

       Send certified mail, overnight mail, and hand-delivered submissions only to:
               RMP Reporting Center
               c/o Computer Based Systems, Inc., Suite 300
               4600 North Fairfax Drive
               Arlington, VA 22203
               Attention: Risk Management Plans

       j. RECORD KEEPING
       You are required to maintain records that support what is reported in your RMP and your
       implementation of the  Risk Management Program for five years (40 CFR §68.200).  EPA will
       maintain RMPs in RMP*Info for 15 years.

       K. PAPERWORK REDUCTION ACT NOTICE
       CAA section 112(r)(7)(B)(iii) requires that sources subject to this rule develop and submit an
       RMP.  The information in the plan will be used by local agencies to improve response
       preparedness and response. Federal, state, and local agencies and the public will use the
       information to understand the hazards present at sources and to work with sources to improve
       prevention practices.  EPA and states will use the data to determine whether additional efforts,
       either regulatory or voluntary, are needed to prevent accidents and to target those efforts. Except
       for confidential business information, information in the plan is available to the public under CAA
       section 114(c) and 40 CFR part 2.  This information collection requirement complies with EPA's

RMP* Submit User Manual February 1999                                                   Ch. 3 Pg. 4

-------
       confidentiality regulations (40 CFR Part 2).

       The public reporting burden of the RMP requirement will depend on which part 68 program level
       applies to how many of the 64,200 sources subject to the RMP requirement.  The public reporting
       burden for rule familiarization is estimated to range from 4 to 68 hours per source for all three
       program levels.  The public reporting burden to prepare and submit the registration and other RMP
       elements is estimated to be 0.5 hours for sources with only Program 1 processes, between 6.0 and
       11.25 hours for Program 2 sources, and between 6.25 and 30.5 hours for Program 3 sources. The
       public record keeping burden to maintain on-site documentation is estimated to range from  10 to
       180 hours for Program 2 sources and from 52 to 1,200 hours for Program 3 sources. On-site
       documentation basis, which varies by rule element, must be developed and maintained on an
       ongoing; documentation must generally be maintained for five years.

       The public reporting burden for the new RMP data elements published in the Federal Register
       January 6, 1999  (64 FR 964) is estimated to be 0.25 hours for all 64,200 sources, and the burden
       for CBI claims is estimated to be 9.5 hours for certain chemical manufacturing sources with
       Program 3 processes.  Of the 9.5 hours of estimate, 8.5 hours is the burden estimated for
       documenting and submitting a CBI claim, and 1 hour is estimated for submitting the actual RMP
       CBI data.

       Burden means the total time, effort, or financial resources expended by persons to generate,
       maintain, retain,  or disclose or provide information to or for a Federal agency.  This includes the
       time needed to review instructions; develop, acquire, install, and utilize technology and systems for
       the purposes of collecting,  validating, and verifying information, processing and maintaining
       information, and disclosing and providing information; adjust the existing ways to comply with any
       previously applicable instructions and requirements; train personnel to be able to respond to a
       collection of information; search data sources; complete and review the collection of information;
       and transmit or otherwise disclose the information. An agency may not conduct or sponsor, and a
       person is not required to respond to, a collection of information unless it displays a currently valid
       OMB control number.

       Send comments on the Agency's need for this information, the accuracy of the provided burden
       estimates, and any suggested methods for minimizing respondent burden, including through the use
       of automated collection techniques to the Director, Regulatory Information Division, U.S.
       Environmental Protection  Agency (2137), 401 M St., S.W., Washington, D.C. 20460; and to the
       Office of Information and  Regulatory Affairs, Office of Management and Budget, Washington,
       D.C. 20503, "Attn.: Desk Officer for the EPA." Include the OMB control number in any
       correspondence.  Do not send the completed RMP form to this address.

       L. Y2K PROBLEMS
       Be sure to consider the impact of Year 2000 (Y2K) related date changes on your facility. The
       Y2K "bug" could affect your computer or process control systems.  It could also affect water and
       electric supply, communications, and deliveries to or from customers. Make sure that possible
       disruptions do not lead to an accidental release.
RMP* Submit User Manual February 1999                                                    Ch. 3 Pg. 5

-------

-------
4.     SUBMITTING CBI & TRADE SECRETS

On January 6, 1999, EPA published a final rule in the Federal Register specifying which RMP data
elements may not be claimed as confidential business information (CBI) or trade secret and what
procedures must be followed to claim information as CBI. The new regulatory provisions, at sections
68.151 and  68.152, provide that if you claim any RMP information as CBI, you must submit to EPA a
sanitized RMP (either on diskette or paper), a Substantiation Form (for explaining why you believe the
information meets the criteria for CBI), and an Unsanitized Data Elements Form (on paper only) (see
Appendices D & E for forms).  The sanitized, or redacted, RMP should not include any CBI. Any CBI
included in  a sanitized RMP (either in diskette or paper form) will be automatically loaded into RMP* Info
and will be  available to the public. Report any information claimed as CBI only on the Unsanitized Data
Elements Form.  The Unsanitized Data Elements Form is only for those data elements that you are claiming
as CBI, not for the entire RMP.

For a data element that requires you to report information that you believe meets the applicable criteria for
CBI, you may claim the information as CBI in one of the following ways:

       If you are submitting on diskette - Check the CBI box at the top of the screen where that data
       element appears and leave the field blank.

       If you are submitting on the RMP Paper Form - Write "CBI" in the space provided  for that data
       element on the  sanitized RMP.

However, if you are claiming chemical name as CBI, you must report one of the following generic
chemical categories. These will appear in the chemical pick  lists in RMP*Submit once you check the CBI
box at the top of the screen.
           CBI Acids
           CBI Amines, Ammonia, and Hydrazines
           CBI Arsenic and Phosphorus Compounds
           CBI Boron Compounds
           CBI Carbonyl Compounds
           CBI Cyanides and Nitriles
           CBI Esters, Alcohols, Aldehydes,  and Furans
           CBI Halogenated Organic Compounds
           CBI Halogens and Halogen Oxides
           CBI Isocyanates and Isothiocyanates
           CBI Nitrogen Oxides and Organic Nitro Compounds
           CBI Organic Silanes
           CBI Oxiranes and Azirdines
           CBI Selenium and Sulfer Compounds
           CBI Flammable Substance
RMP* Submit User Manual February 1999                                                  Ch. 4 Pg. 1

-------
In summary, a complete RMP package with a CBI claim must include #1, #2, #4 & #5, and possibly #3:
        1. A sanitized, complete RMP in which the data elements claimed CBI are left blank except for an
        indication that the information has been claimed as CBI (e.g., for RMPs on diskette, the "CBI" box
        has been checked).  This should be submitted on diskette or on the paper RMP form.  This version
        of the RMP will be in RMP*Info, the publicly accessible database.

        2. Sanitized CBI Substantiation Form(s) (Appendix D). If your explanation of why information is
        CBI entails providing other information you believe is CBI,  you must complete two versions of the
        CBI Substantiation Form ~ a sanitized version and an unsanitized version. The sanitized version
        should omit the information you claim is confidential and leave in its place the notation
        "information claimed confidential." The sanitized form should be submitted on paper only.  If you
        are claiming multiple data elements as CBI, you may need multiple  substantiation forms. All
        pages of all forms must be stapled together. Sanitized Substantiation Forms will  be available to
        the public on request.

        3. Unsanitized CBI Substantiation Form(s) (Appendix D).  If your substantiation includes CBI,
        you must also include an unsanitized version of a completed CBI Substantiation Form that
        provides the information that you claim is CBI. This should be submitted on paper only. If you
        are claiming multiple data elements, you will need multiple  substantiation forms.  All pages of all
        forms must be stapled together.

        4. An Unsanitized  CBI Data Elements Form (Appendix E) that provides the RMP information that
        you claim is CBI.  This should be submitted on paper only.  Staple all pages together.

        5. Certification Letter - signed and dated.

An RMP submission that claims CBI and does not contain the proper forms, will be considered
"incomplete."
RMP* Submit User Manual February 1999                                                    Ch. 4 Pg. 2

-------
5.     WHAT TO EXPECT AFTER YOU SUBMIT.

Once your RMP is processed, you will be notified regarding the submission status of your RMP.
Notification should be within several weeks, except in the first several months following the June 21, 1999
submission deadline.  It is expected that the majority of RMPs due by June 21, 1999 will be sent to the
RMP Reporting Center just before the deadline.  EPA anticipates it will take until the end of August to
process those RMPs.  As a result, your notification letter may be delayed.  EPA apologizes for any delay
and encourages submitters to submit their RMP well  before the June 1999  deadline to avoid the delayed
notification. Remember, you should "CHECK" your RMP using RMP* Submit before it is submitted to be
sure you are submitting a plan that is free of the kinds of errors described previously. The notification will
contain the  following information:

(1)  Your new RMP Identification Number.
       Each facility  will be assigned a unique RMP Identification Number. Save this Identification
       Number.  You will need it for all subsequent RMP submissions, corrections , and correspondence.

(2)  Complete/Incomplete Status of your submitted RMP.
       Once your RMP is received at the RMP Reporting Center, it will be screened for the kind of errors
       described previously. If any such errors are  found, you will receive an Error Report. Please note
       that this Error Report will also be posted with your RMP on the Internet.  Refer to Chapter 6:
       Revisions to your RMP, for instructions on how to correct any errors you may have.

(3)  The postmark date of your RMP.
       You must update your RMP at least every five years. The five-year anniversary for updating your
       RMP will be calculated based on the postmark date of your last RMP submission.  Since you may
       not know the exact postmark date, we will provide it to you for your records. Note, however, that
       §68.190(b) requires you to update your RMP under several different circumstances, some or all of
       which could occur before the fifth anniversary of your last RMP submission.

(4) If you submitted on paper, we willsendyou apaper copy oftheprintout of your RMP.  Paper
       submittals will be entered into RMP* Info manually by data entry staff.  You will receive a print
       out of your RMP as it appears in RMP*Info, the publicly accessible database.
RMP* Submit User Manual February 1999                                                    Ch. 5 Pg. 1

-------

-------
6.     REVISIONS TO YOUR RMP

       A. CORRECTIONS
       If you receive a notification letter from the RMP Reporting Center that informs you that your RMP
       was "incomplete," you will want to correct the errors noted in the accompanying Error Report.
       You may also discover other errors on your own or want to make minor administrative changes
       such as provide a new phone number or contact name.  You do not have to update your entire
       RMP when you make such corrections or administrative changes.  Further, making corrections or
       administrative changes will not affect the five-year anniversary date for updating your RMP.

       To make corrections or administrative changes to an electronically submitted RMP, revise the
       original RMP as needed and submit the revised RMP on diskette.  If you submitted on paper, make
       the changes in red ink on the printout of your RMP submission (which the Reporting Center will
       mail back to you with your notification letter). You must also submit a new certification letter for
       these corrections. A sample certification letter for corrections/updates can be found in Appendix
       C.

       When you  are ready to "Submit" your corrected RMP,  RMP*Submit will prompt you for:
       Submission Type:
               • First-time RMP Submission
               is Correction to my current RMP
               • Re-Submission (all 9 sections are updated  and certified)

       Be sure to check the "correction" box.  The RMP Reporting Center will treat correction RMPs in
       the same manner as initial RMPs and re-submissions.  It will read the diskette, run the validation
       program, post the new RMP (and a new Error Report if there  is one) in RMP* Info, and notify you
       of the results. It will not change the five-year anniversary date for updating your RMP.
RMP* Submit User Manual February 1999                                                    Ch. 6 Pg. 1

-------
        B. RE-SUBMISSIONS
        You must fully update your RMP no later than 5 years after the postmark date of your last
        submission, or sooner if any of the changes specified in §68.190(b) (see box below) occur.
           68.190  Updates.
           (b) The owner or operator of a stationary source shall revise and update the RMP
           submitted under § 68.150 as follows:
                   (1)  Within five years of its initial submission or most recent update required
                   by paragraphs (b)(2)-(b)(7) of this section, whichever is later.
                   (2)  No later than three years after a newly regulated substance is first listed
                   by EPA;
                   (3)  No later than the date on which a new regulated substance is first present
                   in an already covered process above a threshold quantity;
                   (4)  No later than the date on which a regulated substance is first present
                   above a threshold quantity in a new process;
                   (5)  Within six months of a change that requires a revised PHA or hazard
                   review;
                   (6)  Within six months of a change that requires a revised offsite consequence
                   analysis as provided in §68.36; and
                   (7)  Within six months of a change that alters the Program level that applied
                   to any covered process.
       To submit a "re-submission," you must update all nine sections of your RMP. If you submitted
       electronically, revise your previous RMP as appropriate and submit the updated RMP on diskette.
       You must also submit a new certification letter for the updated RMP that covers all the information
       in the RMP. A sample certification letter can be found in Appendix C. Re-submissions will re-set
       the 5-year anniversary date by which you must next update your RMP.

       When you are ready to "Submit" your updated RMP, RMP*Submit will prompt you for:
       Submission Type:
               • First-time RMP Submission
               • Correction to my current RMP
               is Re-Submission (all 9 sections are updated and certified)

       Be sure to check the "Re-Submission" box. The RMP Reporting Center will treat all RMPs in the
       same manner.  It will read the diskette, run the validation program, post the new RMP (and a new
       Error Report if there is one) in RMP* Info, and notify you of the results.
RMP* Submit User Manual February 1999
Ch. 6 Pg. 2

-------
       c. DE-REGISTRATION
       Changes may occur at your facility that make it no longer subject to part 68 (e.g., you replace the
       regulated substances in your processes with unregulated substances).  In that event, you should
       submit a letter to the RMP Reporting Center within six months and include the effective date of the
       de-registration (the date on which your facility was no longer covered by part 68). The letter
       should be signed by the owner or operator and include your RMP ID number.  RMP* Submit will
       generate this letter for you by running the DE-REGISTER function (from the Main Menu).

       Mail the signed letter to:
               RMP Reporting Center
               P.O. Box 3346
               Merrifield, VA 22116-3346
               Attention: Risk Management Plans

       If your facility de-registers and later becomes subject to the RMP regulation again , you will need
       to submit a new RMP.  Submit the new RMP as a re-submission (see RE-SUBMISSIONS above)
       using your previous EPA Facility ID#.

       De-registered facilities will be noted as such in RMP*Info.  De-registered RMPs will  remain in
       RMP*Info for 15 years.
RMP* Submit User Manual February 1999                                                   Ch. 6 Pg. 3

-------

-------
7.      STATE-SPECIFIC INFORMATION

States may take delegation of the RMP Program under section 112(1) of the Clean Air Act by adopting a
program that is at least as stringent as the federal program and obtaining EPA approval of that program.
The aspects of a state RMP program that are submitted under section 112(1), once approved by EPA, are
federally enforceable. See 40 C.F.R. Part 63, Subpart E.

A number of states are taking delegation of the section 112(r) program in their state.  Several of these
states will regulate chemicals that are not listed in the federal section 112(r) program. At least two states
(Louisiana and Rhode Island) are including some of those additional chemicals in their section 112(1)
submittal to EPA; those chemicals will become part of the federally enforceable program in those states if
EPA approves the programs. Louisiana and Rhode Island have worked with EPA to include those
additional chemicals in RMP* Submit.  Below is a list of the chemicals Louisiana and Rhode Island are
adding and that you will see in RMP* Submit if your facility is located in either of those states. Louisiana
and Rhode Island facilities should use RMP*Submitto report both EPA and State-only chemicals.

New Jersey is also taking delegation of the section 112(r) program and, will regulate some chemicals that
are not listed in the federal section 112(r) program. Unlike Louisiana and Rhode Island, however, New
Jersey is not including its additional chemicals in its section 112(1) submittal to EPA. As a result, those
additional chemicals will not be part of the federally approved program and will not be subject to federally
enforceable RMP requirements.  At New Jersey's request, EPA has included the state's additional
chemicals in RMP* Submit's "pick list" of chemicals so that New Jersey facilities may use RMP* Submit
for reporting on those chemicals to New Jersey. (All State-only chemicals are identified as such in the
chemical pick list.) However, the RMP sent to EPA should not contain any information pertaining to New
Jersey's additional chemicals. Facilities in New Jersey that have both EPA-listed and New Jersey-listed
chemicals in more than threshold quantities must fill out two RMPs:  one to be sent to EPA and one to be
sent to New Jersey.  The RMP to be  sent to EPA should include only information relating to EPA-listed
chemicals. The RMP to be sent to New Jersey should include information on both EPA-listed and New
Jersey-listed chemicals (because New Jersey, if it obtains delegation,  will have authority to enforce both the
federal and state-only aspects of the  RMP program in that state).  It is important that the RMP sent to EPA
not include the New Jersey-only information for two reasons. First, EPA's electronic program for
processing RMPs will not be able to process RMPs containing information on New Jersey's  additional
chemicals. Second, certain information, such as the worst-case scenario submitted for compliance with the
federally enforceable program cannot be based on a New Jersey-only chemical.  For example, the overall
worst-case scenario for a facility with both EPA-listed and New Jersey-listed chemicals might  involve a
New Jersey-listed chemical, but the federally enforceable RMP must address the worst-case  scenario for
the federally enforceable (i.e. EPA-listed) chemicals. It would thus be advisable for New Jersey facilities
with both EPA-listed and New Jersey-listed chemicals to fill out their federally enforceable RMP first, and
then use that as the basis for filling out the RMP to be sent to New Jersey covering both EPA-listed and
New Jersey-listed chemicals. For additional guidance for those chemicals that are listed on both the EPA
and New Jersey RMP list at different concentrations levels, contact New Jersey  DEP, Bureau of Chemical
Release Information and Prevention  at (609) 633-7289.

Besides adding chemicals, states taking delegation of the section 112(r) program may establish additional
control or procedural requirements for facilities in their states (e.g., requirements to alert specified agencies
in case of release). If submitted  (as part of the delegation package) and approved, those additional
requirements will become federally enforceable. RMP*Submit, however, does not have a mechanism for
providing any information with respect to such additional requirements. Check with your Implementing
RMP* Submit User Manual February 1999                                                    Ch. 7 Pg. 1

-------
Agency to see if there are any additional requirements applicable to your facility and what reporting
requirements might apply. A list of State contacts can be found in Appendix G. New Jersey will publish
an addendum to the RMP* Submit User Manual for New Jersey facilities which will include instructions for
additional questions required by New Jersey. The addendum will be available after March 1999 from the
NJ DEP web site (www.state.nj.us/dep/enforcement/relprev/tcpa/) or by calling (609) 633-7289.

Additional State Chemicals to be addressed in RMP sent to EPA
Nitrogen tetroxide (LA)
Hydrochloric acid (cone 30% or greater) (RI)
Hydrogen fluoride/Hydrofluoric acid (cone 40% or greater) (RI)
Nitric acid (cone 40% or greater) (RI)
Additional State Chemicals to be addressed in RMP sent to EPA
Nitrogen tetroxide (LA)
Hydrochloric acid (cone 30% or greater) (RI)
Hydrogen fluoride/Hydrofluoric acid (cone 40% or greater) (RI)
Nitric acid (cone 40% or greater) (RI)
Toxic or Flammable
Toxic
Toxic
Toxic
Toxic
RMP* Submit User Manual February 1999
Ch. 7 Pg. 2

-------
8.
GLOSSARY OF ACRONYMS & TERMS
CBI           Confidential Business Information
CPU          Central Processing Unit
DLL          Dynamic Link Library
EPA          Environmental Protection Agency
EPCRA       Emergency Planning and Community Right-to-Know
GPF          General Protection Fault
MB           Megabyte(s)
NAICS        North American Industrial Classification System
OCA          Offsite Consequence Analysis
Pick List      A list of items to choose for an answer.
POTWs       Publicly Owner Treatment Works
RAM         Random Access Memory
RMP          Risk Management Plan
VGA          Video Graphics Adapter
RMP* Submit User Manual February 1999
                                                                          Ch. 8 Pg. 1

-------

-------
  vvEPA
Risk Management  Plan  Form
          Section 112(r) of the Clean Air Act
                                                                            Form Approved: 2/22/1999
                                                                       OMB Control Number: 2050-0144
IMPORTANT: Type or print; read instructions before completing form.
 Submission Type:

 Q First-Time RMP Submission

 Q Correction to My Current RMP

 Q Re-Submission (all 9 sections are updated and certified)
                        Where to Send Completed Forms:

                             RMP Reporting Center
                             P.O. Box 3346
                             Merrifield, VA 22116-3346
                             Attention: RMP*Submit
Facility Name:
       Executive Summary
       (attach a separate piece of paper if you need additional space)
                                     I  I   I  I   l-l   I  I   I  l-l  Ml
                                     EPA Facility ID# (leave blank for first submission only)
EPA Form 8700-25 (Date 2/1999)
                                           Page ES-_
                                                              Appendix A

-------
  vvEPA
Risk Management Plan
Facility Name:
      Section 1. Registration
 1.1 Source Identification
                                                        EPA Facility ID# (leave blank for first submission only)
 1.1.a. Facility Name (maximum 50 characters)
 1.1 .b. Parent Company #1 Name (maximum 50 characters)
 1.1 .c. Parent Company #2 Name (maximum 50 characters)
 1.2. EPA Facility Identifier (12 characters)
                                         I  I   I   -I  I   I  I   -I  I  I  I
                                       (leave blank for first submission only)
 1.3. Other EPA Systems Facility Identifier (15 characters)
                              I   I   I   I  I   I   I   I   I   I   I   I   I   I   I   I
 1.4. Dun and Bradstreet Numbers (DUNS) (9 characters)
1.4. a. Facility
I I I I
DUNS
I I I I I I
1.4.b. Parent Company #1 DUNS
I 1 1 1 1 1 1 1 1 I
1 Ac. Parent Company #2 DUNS
I 1 1 1 1 1 1 1 1
I
 1.5 Facility Location
1.5
1.5
1.5
1.5
I
a. Street - Line 1
b. Street - Line 2
c. City (maximum
e. Zip Code
I I I I
(maximum 35 characters)
(maximum 35 characters)
19 characters)
Zip +4 Code
I I I I I I

1.5
1.5
for
g. Facility Latitude
I I I I I
+/- D D
(report in degrees, minutes, and seconds)
1 I I I LI I
MM S S S
i. Method for determining Lat/Long (see User Manual
codes)
I I I
1.5.d. State
I I I

1.5.f. County (maximum 20 characters)
1 .5.h. Facility Longitude (report in degrees, minutes, and seconds)
I I I 1 I I I I I 1 I.I I
+/-DDD MM SS S
1.5.J. Description of location identified by Lat/Long (see
User Manual for codes)
I I I
EPA Form 8700-25 (Date 2/1999)
                                         Page 1-1

-------
  xvEPA
Facility Name:
       Section 1. Registration
 1.6. Owner or Operator
Risk Management Plan
            i  i  iii  1-1  i   i  i  1-1  i  i   i  i
         EPA Facility ID# (leave blank for first submission only)
 1.6.a.  Name (maximum 35 characters)
 1.6.b. Phone
               M   I   I   I/I   I   I   l"l  I   I   I   I
 Owner or Operator Mailing Address
 1.6.C.  Street- Line 1 (maximum 35 characters)
 1.6.d. Street - Line 2 (maximum 35 characters)
 1.6.e. City (maximum 19 characters)
 1.6.f. State
                                                             I   I   I
 1.6.g. Zip Code         Zip+4 Code

    I   I   I  I   I   I - I   I   I   I   I
 1.7. Name and title of person or position responsible for RMP (part 68) implementation
 1.7.a. Name of person (maximum 35 characters)
 1.7.b. Title of person or position (maximum 35 characters)
 1.8. Emergency Contact
1.8. a. Name (maximum 35 characters)
1.8.C. Phone
V| I I |)| I I f| 1 1 1 1

1.8.b. Title of person or position (maximum 35 characters)
1.8.d. 24-Hour Phone
V| I I |)| I I f| 1 1 1 1

1.8.e. 24-Hour Phone Extension/PIN # (maximum 35 characters)
 1.9. Other Points of Contact (Optional)
1.9.8.
1.9.C.
Facility or Parent Company E-mail Address
(maximum 100 characters)
1.9.b. Facility Public Contact Phone Number
(\ I I I/I I I fl 1 1
1 1

Facility or Parent Company WWW Homepage Address (maximum 100 characters)

EPA Form 8700-25 (Date 2/1999)
                                         Page 1-2

-------
  xvEPA
Facility Name:
                                              Risk Management  Plan
                                                             i   i i
       Section 1. Registration
                                                        EPA Facility ID# (leave blank for first submission only)
 1.10. Local Emergency Planning Committee (LEPC) (optional) (maximum 30 characters)
 1.11. Number of full-time employees (FTEs) on site
                                                I   I   I   I   I   I
 1.12. Covered by (select all that apply)
 a 1.12.a. OSHAPSM
 a 1.12.b. EPCRA section 302
 Q 1.12.C. CAA Title V Air Operating Permit Program. If covered, specify permit ID# below.

         I   I   I   I   I   I   I   I   I  I   I    I   I   I   I   I
 1.13. OSHA Star or Merit Ranking (optional)
                                a Yes
                                           a NO
 1.14. Last Safety Inspection (by an External Agency) Date
                                                  i   i   i   i   i   i    i   i   i   i   i
                                                   MM     DD      YYYY
1.15. Last Safety Inspection Performed by an External Agency (select one)
Q 1.15.8. OSHA                                   LI 1.15.f. Never had one
Q 1.15.b. State occupational safety agency
a 1.15.C. EPA
Q 1.15.d. State environmental agency
Q 1.15.e. Fire department
                                                   1.15.g. Other (specify) (maximum 50 characters)
 1.16. Will this RMP involve Predictive Filing? (optional)
                                                    Yes
                                                              a NO
EPA Form 8700-25 (Date 2/1999)
                                           Page 1-3

-------
  xvEPA
  Risk  Management Plan
Facility Name:
       Section 1. Registration
                                                        EPA Facility ID# (leave blank for first submission only)
 1.17. Process Specific Information. For each covered process, fill in this page. If you are reporting more than one
 process, make a photocopy of this page and report each process on a separate sheet.
 Process ID# (optional-for your reference only)
 Process Description (optional-for your reference only)
 1.17.a. Program Level (select one)
                                a  1
a  2
a  3
 1.17.b. NAICS Code(s) (five or six digits)

 I   I   I   I   I    I   I   I   I   I   I   I   I   I   I   I    I   I   I   I   I   I   I   I   I   I   I   I
 1.17.C. Chemical(s) (regulated substance(s))
1.17.C.1. Name (maximum 100 characters)









1.17.C.2. CAS Number (10 characters)

I I I I I I I I I I I


I I I I I I I I I I I


I I I I I I I I I I I


I I I I I I I I I I I


I I I I I I I I I I I


I I I I I I I I I I I

I I I I I I I I I I I

I I I I I I I I I I I

I I I I I I I I I I I
1.17.C.3.
Quantity (Ibs)
(max. 12 chars.)









      If you need more space to list NAICS codes or chemicals, please make a photocopy of this sheet.
EPA Form 8700-25 (Date 2/1999)
                                           Page 1-4
                     Are you claiming confidential business
                            information in this section?

-------
  vvEPA
Facility Name:
    Risk Management  Plan
                                                            EPA Facility ID# (leave blank for first submission only)
       Section 2. Toxics:  Worst Case

       (If you need to report a worst-case scenario, make a photocopy of pages 2-1 and 2-2 and report each scenario separately)

 2.1. Chemical
2.1.a. Name (maximum 100 characters)
2.1 .b. Percent weight of chemical (if in a mixture)
I I I.I l%


2.2. Physical state (select one)
a 2.2.a. Gas
a 2.2.b. Liquid
LI 2.2.c. Gas liquified by pressure
LI 2.2.d. Gas liquified by refrigeration
 2.3. Model Used (select one or enter another model name in Other below)
 LI 2.3.a. EPA's OCA Guidance Reference Tables or Equations
 LI 2.3.b. EPA's BMP Guidance for Ammonia Refrigeration Reference Tables or Equations
 LI 2.3.d. EPA's RMP Guidance for Waste Water Treatment Plants Reference Tables or Equations
 LI 2.3.e. EPA's RMP Guidance for Warehouses Reference Tables or Equations
 LI 2.3.f. EPA's RMP Guidance for Chemical Distributors Reference Tables or Equations
 a 2.3.g. EPA's RMP*Comp™
 LI 2.3.h. Areal Locations of Hazardous Atmospheres (ALOHA®)
 LI 2.3.z. Other model (specify) (maximum 255 characters)
 2.4. Scenario (select one)
 LI 2.4.a. Gas Release
       LI 2.4.b. Liquid Spill and Vaporization
2.5.
Quantity released (Ibs)
I I I I I I I I I I I I I


2.7.
Release duration (minutes)
I I I I I . I I
2.6. Release rate (Ibs/minute)
lllllllll.il


2.8. Wind speed (meters/second)
I I I I I . I I
 2.9. Atmospheric stability class (A-F)
 2.10. Topography (select one)
 a 2.10.a. Urban
         2.10.b. Rural
 2.11. Distance to endpoint (miles)
                                   J	L
EPA Form 8700-25 (Date 2/1999)
Page 2-1
                                                                      Are you claiming confidential business
                                                                             information in this section?

-------
  vvEPA
Facility Name:
       Section 2. Toxics:  Worst Case
    Risk Management Plan
                 I  I   III  l-l  I   I  I   l-l  I   I  I   I
              EPA Facility ID# (leave blank for first submission only)
 2.12. Estimated residential population within distance to endpoint (numeric)
                                                              I   I   I  ,  I   I   I   I  ,  I   I   I   I
 2.13. Public receptors within distance to endpoint (select all that apply)
 LI 2.13.a. Schools                                     Q 2.13.g. Other (specify) (maximum 200 characters)
 a 2.13.b. Residences
 a 2.13.C. Hospitals                                    	
 Q 2.13.d. Prison/Correctional Facilities
 Q 2.13.e. Recreation Areas
 Q 2.13.f. Major commercial, office, or industrial areas       	
 2.14. Environmental receptors within distance to endpoint (select all that apply)
 Q 2.14.a. National or State Parks, Forests, or               Q 2.14.d. Other (specify) (maximum 200 characters)
         Monuments
 Q 2.14.b. Officially Designated Wildlife Sanctuaries,         	
         Preserves, or Refuges
 Q 2.14.C. Federal Wilderness Area                       	
 2.15. Passive mitigation considered (select all that apply)
 a 2.15.a. Dikes
 LI 2.15.b. Enclosures
 a 2.15.c. Berms
 a 2.15.d. Drains
 a 2.15.e. Sumps
         2.15.f. Other (specify) (maximum 200 characters)
 2.16. Graphics file name (optional) (maximum 12 characters)
EPA Form 8700-25 (Date 2/1999)
Page 2-2
                                                                     Are you claiming confidential business
                                                                             information in this section?

-------
  vvEPA
Facility Name:
    Risk  Management  Plan
                                                              EPA Facility ID# (leave blank for first submission only)
        Section 3. Toxics: Alternative Releases

         : you need to report more than one alternative release scenario, make a copy of pages 3-1 and 3-2 and report each scenario separately)

 3.1. Chemical
 3.1.a. Name (maximum 100 characters)
 3.1 .b. Percent weight of chemical (if in a mixture)
 3.2. Physical State (select one)
 a 3.2.a. Gas
 a 3.2. b. Liquid
       LI 3.2.c. Gas liquified by pressure
       LI 3.2.c. Gas liquified by refrigeration
 3.3. Model Used (select one or enter another model name in Other below)
 LI 3.3.a. EPA's OCA Guidance Reference Tables or Equations
 LI 3.3.b. EPA's BMP Guidance for Ammonia Refrigeration Reference Tables or Equations
 LI 3.3.d. EPA's RMP Guidance for Waste Water Treatment Plants Reference Tables or Equations
 LI 3.3.e. EPA's RMP Guidance for Warehouses Reference Tables or Equations
 LI 3.3.f. EPA's RMP Guidance for Chemical Distributors Reference Tables or Equations
 a 3.3.g. EPA's RMP*Comp™
 LI 3.3.h. Areal Locations of Hazardous Atmospheres (ALOHA®)
 LI 3.3.z. Other model  (specify) (maximum 200 characters)
 3.4. Scenario (select one)

 LI 3.4.a. Transfer hose failure
 a 3.4.b. Pipe leak
 LI 3.4.c. Vessel leak
 a 3.4.d. Overfilling
 LI 3.4.e. Rupture disk/relief valve failure
       LI 3.4.f. Excess flow device failure
       LI 3.4.g. Other (specify) (maximum 35 characters)
3.5. Quantity released (Ibs)
I I I I I I I I I I I I I
3.7. Release duration (minutes)
I I I I I.I I

3.9. Atmospheric stability class (A-F)
I 	 I
3.6. Release rate (Ibs/minute)
lllllllll.il
3.8. Wind speed (meters/second)
I I I I.I I


EPA Form 8700-25 (Date 2/1999)
Page 3-1
                                                                        Are you claiming confidential business
                                                                               information in this section?

-------
 vvEPA
   Risk  Management  Plan
Facility Name:
                                                 I  I
                        I  I
I  I  I
      Section 3. Toxics: Alternative Releases
                                             EPA Facility ID# (leave blank for first submission only)
3.10. Topography (select one)
a 3.10.a. Urban G 3.10. b. Rural

3.11. Distance to endpoint (miles)
I I I I.I I I



3.12. Estimated residential population within distance to endpoint
I I I i \ \
\\i\\\\

3.13. Public receptors within distance to endpoint (select all that apply)
Q 3.13.a. Schools Q 3.13.e. Recreation areas
Q 3.13.b. Residences Q 3.13.f. Major commercial, office, or industrial areas
Q 3.13.C. Hospitals Q 3.13.g. Other (specify) (maximum 200 characters)
Q 3.13.d. Prisons/Correctional facilities


3.14. Environmental receptors within distance to endpoint
Q 3.14.a. National or State Parks, Forests, or
Monuments
Q 3.14.b. Officially Designated Wildlife Sanctuaries,
Preserves, or Refuges
Q 3.14.C. Federal Wilderness Area
(select all that apply)
Q 3.14.d. Other (specify) (msximum


200 characters)



3.15. Passive mitigation considered (select all that apply)
LI 3.15.a. Dikes
Q 3.15.b. Enclosures
LI 3.15.C. Berms
a 3.15.d. Drains
LI 3.15.e. Sumps
Q 3.15.f. Other (specify) (msximum

200 characters)

3.16. Active mitigation considered
Q 3.16.a. Sprinkler systems
Q 3.16.b. Deluge systems
LI 3.16.C. Water curtain
a 3.16.d. Neutralization
Q 3.16.e. Excess flow valve
a3.16.f. Flares
(select all that apply)
a
a
a


3.16.g. Scrubbers
3.16.h. Emergency shutdown systems
3.16.L Other (specify) (maximum 200 characters)



3.17 Graphics file name (optional)
(maximum 12 characters)

EPA Form 8700-25 (Date 2/1999)
Page 3-2
                                                     Are you claiming confidential business
                                                          information in this section?

-------
  vvEPA
 Risk Management Plan
Facility Name:
                                                   EPA Facility ID# (leave blank for first submission only)
      Section 4. Flammables: Worst Case

        you need to report more than one worst-case scenario, make a photocopy of pages 4-1 and 4-2 and report each scenario separately)
4.1. Chemical Name (maximum 100 characters)
4.2. Model Used (select one or enter another model name in Other below)
Q 4. 2. a. EPA's OCA Guidance Beference Tables or Equations
Q 4.2.c. EPA's BMP Guidance for Propane Storage Facilities Beference Tables or Equations
Q 4.2.d. EPA's BMP Guidance for Waste Water Treatment Plants Beference Tables or Equations
Q 4.2.e. EPA's BMP Guidance for Warehouses Beference Tables or Equations
Q 4.2.f. EPA's BMP Guidance for Chemical Distributors Beference Tables or Equations
a 4.2.g. EPA's BMP*Comp™
Q 4.2.z. Other model (specify) (maximum 235 characters)


4.3. Scenario (only one option)
Vapor Cloud Explosion

4.4. Quantity released (Ibs)
I I I I I I I I I I I I I


4.6. Distance to endpoint (miles)
I I I I.I I I


4.8. Public receptors within distance to endpoint (select
a 4.8.a. Schools
Q 4.8.b. Besidences
Q 4.8.C. Hospitals
Q 4.8.d. Prisons/Correctional Facilities
Q 4.8.e. Becreation Areas

4.5. Endpoint Used (only one option)
1 PSI

4.7. Estimated residential population within distance
to endpoint
1 M 1 1 M 1 1


all that apply)
Q 4.8.f. Major commercial, office, or industrial areas
Q 4.8.g. Other (specify) (maximum 200 characters)



4.9. Environmental receptors within distance to endpoi
Q 4. 9. a. National or State Parks, Forests, or Monuments
Q 4.9.b. Officially Designated Wildlife Sanctuaries,
Preserves, or Befuges
Q 4.9.c. Federal Wilderness Area
it (select all that apply)
Q 4.9.d. Other (specify) (maximum 200 characters)


EPA Form 8700-25 (Date 2/1999)
Page 4-1
                                                           Are you claiming confidential business
                                                                  information in this section?

-------
  xvEPA
Facility Name:
 Risk  Management Plan
                                                         i   i i
      Section 4. Flammables: Worst Case
                                                     EPA Facility ID# (leave blank for first submission only)
 4.10. Passive mitigation considered (select all that were considered in defining the release quantity or rate for
 the worst-case scenario)
   4.10.a. Blast walls
     4.10.b. Other (specify) (maximum 200 characters)
 4.11. Graphics file name (optional) (maximum 12 characters)
EPA Form 8700-25 (Date 2/1999)
Page 4-2
                                                             Are you claiming confidential business
                                                                    information in this section?

-------
  vvEPA
Facility Name:
 Risk  Management  Plan
                                                          EPA Facility ID# (leave blank for first submission only)
       Section 5. Flammables: Alternative Releases

         you need to report more than one alternative release scenario, make a copy of pages 5-1 and 5-2 and report each scenario separately)
 5.1. Chemical Name (maximum 100 characters)
 5.2. Model Used (select one or enter another model name in Other below)
 LI 5.2.a. EPA's OCA Guidance Reference Tables or Equations
 LI 5.2.c. EPA's  BMP Guidance for Propane Storage Facilities Reference Tables or Equations
 LI 5.2.d. EPA's BMP Guidance for Waste Water Treatment Plants Reference Tables or Equations
 LI 5.2.e. EPA's BMP Guidance for Warehouses Reference Tables or Equations
 LI 5.2.f. EPA's BMP Guidance for Chemical Distributors Reference Tables or Equations
 a 5.2.g. EPA's RMP*Comp™
 LI 5.2.z. Other model (specify) (maximum 255 characters)
5.3. Scenario (select one)
LI 5. 3. a. Vapor cloud explosion
a 5.3.b. Fireball
a 5.3.C. BLEVE
a 5.3.d. Pool fire
a 5.3.e. Jet fire
LI 5.3.f. Vapor cloud fire
LI 5.3.g. Other (specify) (maximum 30 characters)



5.4. Quantity released (Ibs)
I I I I I
I I I I I I I I


5.5. Endpoint used (select one)
a 5.5.3. 1 PSI
LI 5.5.b. 5 kw/m2 for 40 seconds
LI 5. 5. c. Lower flammability limit (specify) i i i i i


5.6. Distance to endpoint (miles)
I I I I.I
5.7. Estimated residential population within distance
to endpoint
II I I \,\ I I \,\ \ \ I

EPA Form 8700-25 (Date 2/1999)
Page 5-1
                                                                    Are you claiming confidential business
                                                                           information in this section?

-------
 vvEPA
Risk Management Plan
Facility Name:
                                                 I  I
                      I  I
I  I  I
     Section 5. Flammables: Alternative Releases
                                             EPA Facility ID# (leave blank for first submission only)
5.8. Public receptors within distance to endpoint (select a
Q 5. 8. a. Schools
Q 5.8.b. Residences
a 5.8.C. Hospitals
Q 5.8.d. Prisons/Correctional facilities
Q 5.8.e. Recreation areas
II that apply)
Q 5.8.f. Major commercial, office, or industrial areas
Q 5.8.g. Other (specify) (maximum 200 characters)



5.9. Environmental receptors within distance to endpoint
Q 5. 9. a. National or State Parks, Forests, or
Monuments
Q 5.9.b. Officially Designated Wildlife Sanctuaries,
Preserves, or Refuges
Q 5.9.C. Federal Wilderness Area
(select all that apply)
Q 5.9.d. Other (specify) (maximum 200 characters)



5.10. Passive mitigation considered (select all that apply)
LI 5.10.a. Dikes
LI 5.10.b. Fire walls
LI 5.10.C. Blast walls
Q 5.10.d. Enclosures
Q 5.10.e. Other (specify) (maximum 200 characters)


5.11.
a 5.
a 5.
n 5
a 5.

Active mitigation considered (select all that apply)
1 1 .a. Sprinkler system Q
1 1.b. Deluge system
1 1 c Water curtain
1 1 .d. Excess flow valve


5.1 1 .e. Other (specify) (maximum 200 characters)





5.12.
Graphics file name (optional) (maximum 12 characters)

EPA Form 8700-25 (Date 2/1999)
Page 5-2
                                                    Are you claiming confidential business
                                                          information in this section?

-------
  vvEPA
Facility Name:
 Risk  Management  Plan
       Section 6. Five-Year Accident History
                                                           EPA Facility ID# (leave blank for first submission only)
        : you need to report more than one accident history, make a photocopy of pages 6-1 through 6-3 and report each accident separately)
 Would you like to certify that your facility did not have any reportable accidents in the last 5 years?
 O Yes; leave the rest of this section blank    O No; fill out this section for each accident
6.1.
Date of accident (day, month, and year)
i i i i i i i i i i i
MM DD YYYY

6.3.
NAICS code of process involved
I I I I I I I

6.2. Time accident began (hours and minutes)
Q a.m.
i i i i i i Q p.m.
H H MM

6.4. Release duration (hours and minutes)
i i i i i i i
H H H MM
 6.5. Chemical(s) released (if you need more space to list chemicals, please make a photocopy of this sheet)
6.5.a.i. Chemical name (maximum 100 char-
acters)




6.5.a












.ii CAS number
I

I

I

I
























I I I I

I I I I

I I I I

I I I I
6.5.b.
Quantity
released (Ibs.)




6.5.C. Percent
weight of chemical
if in a mixture
(toxics only)
I I I . |_| %
I I I . |_| %
I I I . |_| %
I I I . |_| %
 6.6. Release event (select at least one)

 0 a. Gas release
 0 b. Liquid spill/evaporation
 0 c. Fire
 O d. Explosion
 6.7. Release source (select at least one)
 0 a. Storage vessel
 0 b. Piping
 O c. Process vessel
 O d. Transfer hose
 O e. Valve
 a f. Pump
 0 g. Joint
 O h. Other (specify) (maximum 200 characters)
EPA Form 8700-25 (Date 2/1999)
Page 6-1
                                                                     Are you claiming confidential business
                                                                             information in this section?

-------
  xvEPA
Facility Name:
 Risk Management  Plan
                                                            i   i i
       Section 6. Five-Year Accident History
 6.8. Weather conditions at time of event
                                                       EPA Facility ID# (leave blank for first submission only)
a.i. Wind speed (numerical) Wind s
1 1 1 1. 1 1 PI mile

b. Temperature m
1 1 1 1

peed unit
s/hr. Q knots Q meters/sec.
c. Atmospheric stability class (A-F)
1 	 1
a.ii. Wind direction
1 1 1 1

Q d. Precipitation present
Q e. Unknown weather conditions (check if a-d are all unknown)
 6.9. On-site Impacts
a. Deaths (enter numbers)
a i Fmployppc; or rr>ntra<~tr>rc: 1 1 1 1 1 1
a.ii. Public responders 1 1 1 1
a.iii. Public 1 1 1 1 1 1

c. Property damage
$ 1 1 1 I.I 1 1

b. Injuries (enter numbers)
b i Fmployppc; r>r mntra^ton; 1 1 1 1 1 1
b.ii. Public responders 1 1 1 1
b.iii. Public 1 1 1 1 1 1

Jill

 6.10. Known off-site impacts (enter numbers)
 a. Deaths              	d. Evacuated       	

 b. Hospitalizations        I   I   I   I   I   I   I   I    I e. Sheltered-in-place  I   I   I   I   I   I   I   I   I

 c. Other medical treatment I   I   I   I   I   I   I   I    I f. Property damage ($):

                                                  I   I   I   I   I   I   I   I   I   I   I   I   I
 6.10.g. Environmental damage (select all that apply)
 Q g.1. Fish or animal kills
 Q g.2. Tree, lawn, shrub, or crop damage
 Q g.3. Water contamination
 Q g.4. Soil contamination
 Q g.5. Other (specify) (maximum 200 characters)
EPA Form 8700-25 (Date 2/1999)
Page 6-2
                                                                Are you claiming confidential business
                                                                       information in this section?

-------
  vvEPA
Facility Name:
 Risk  Management  Plan
                                                                i   i
                             i  i
i   i  i
       Section 6. Five-Year Accident History
                                                           EPA Facility ID# (leave blank for first submission only)
 6.11. Initiating event (select one)
 Q a. Equipment failure
 Q b. Human error
     c. Natural (weather conditions, earthquake)
     d. Unknown
 6.12. Contributing factors (select all that apply)
 Q a. Equipment failure
 Q b. Human error
 Q c. Improper procedure
 Q d. Overpressurization
 Q e. Upset condition
 Q f. By-pass condition
 Q g. Maintenance activity/inactivity
 Q h. Process design failure
     i. Unsuitable equipment
     j. Unusual weather conditions
     k. Management error
     I. Other (specify) (maximum 200 characters)
 6.13. Off-site responders notified (select one)
 Q a. Notified only
 Q b. Notified and responded
     c. No, not notified
     d. Unknown
 6.14. Changes introduced as a result of the accident (select at least one)
   a. Improved/upgraded equipment
   b. Revised maintenance
   c. Revised training
   d. Revised operating procedures
   e. New process controls
   f. New mitigation systems
   g. Revised emergency response plan
   h. Changed process
   i. Reduced inventory
     j. None
     k. Other (specify) (maximum 200 characters)
EPA Form 8700-25 (Date 2/1999)
Page 6-3
                                                                     Are you claiming confidential business
                                                                            information in this section?

-------
  vvEPA
 Risk  Management Plan
Facility Name:
                                                     EPA Facility ID# (leave blank for first submission only)
      Section 7. Prevention Program:  Program 3

      (If you need to report more than one prevention program, make a photocopy of pages 7-1 through 7-4 and report each separately)
 Prevention program description:
7.1 NAICS code for process
7.2 Chemical name(s)
(maximum 100 characters)
I I I I I I I






            If you need more space to list chemicals, please make a photo copy of this sheet.
7.3
7.4
7.4
. Date on which the safety information
. Process Hazards Analysis (PHA)
.a. Date of last PHA or PHA update
i i i
M M
was last reviewed or revised
i i i i i i i i i i i
MM DD YYYY

1 1 1 1 1 1 1 1
D D YYYY

7.4
a
.b. Technique used (select at least one)
7.4.b.1. What If
7.4.b.2. Checklist
7.4.b.3. What If/Checklist (combined)
7.4.b.4. HAZOP
7.4.b.5. Failure Mode & Effects Analysis
Q 7.4.b.6. Fault Tree Analysis
Q 7.4.b.7. Other (Specify) (maximum 200 characters)


EPA Form 8700-25 (Date 2/1999)
Page 7-1
                                                             Are you claiming confidential business
                                                                    information in this section?

-------
  vvEPA
Facility Name:
 Risk Management  Plan
                                                                     i   i
                               i  i
i   i   i
        Section 7.  Prevention Program:  Program 3
                                                               EPA Facility ID# (leave blank for first submission only)
 7.4.c. Expected or actual date of completion of all changes resulting from last PHA or PHA update
                                                                   I    I   I    I   I   I   |	L
                                                                     M  M
 7.4.d. Major hazards identified (select at least one)
 LI  7.4.d.1. Toxic release
 a  7.4.d.2. Fire
 LI  7.4.d.3. Explosion
 LI  7.4.d.4. Runaway reaction
 LI  7.4.d.5. Polymerization
 LI  7.4.d.6. Overpressurization
 LI  7.4.d.7. Corrosion
 a  7.4.d.8. Overfilling
 LI  7.4.d.9. Contamination
   LI 7.4.d.10. Equipment failure
   LI 7.4.d.11. Loss of cooling, heating, electricity,
              instrument air
   LI 7.4.d.12. Earthquake
   a 7.4.d.13. Floods (flood plain)
   a 7.4.d.14. Tornado
   LI 7.4.d.15. Hurricanes
   LI 7.4.d.16. Other (specify) (maximum 200 characters)
 7.4.e. Process controls in use (select at least one)
 a  7.4.e.1. Vents
 a  7.4.e.2. Relief valves
 LI  7.4.e.3. Check valves
 LI  7.4.e.4. Scrubbers
 a  7.4.6.5. Flares
 LI  7.4.6.6. Manual shutoffs
 LI  7.4.e.7. Automatic shutoffs
 a  7.4.6.8. Interlocks
 LI  7.4.6.9. Alarms and procedures
 LI  7.4.e.10. Keyed bypass
 LI  7.4.e.11. Emergency air supply
   LI 7.4.e.12. Emergency power
   LI 7.4.e.13. Backup pump
   LI 7.4.6.14. Grounding equipment
   LI 7.4.e.15. Inhibitor addition
   a 7.4.6.16. Rupture disks
   LI 7.4.6.17. Excess flow device
   LI 7.4.e.18. Quench system
   LI 7.4.6.19. Purge system
   a 7.4.e.20. None
   LI 7.4.e.21. Other (specify) (maximum 200 characters)
 7.4.f. Mitigation systems in use (select at least one)
 LI  7.4.f. 1. Sprinkler system
 a  7.4.f.2. Dikes
 a  7.4.f.3. Firewalls
 a  7.4.f.4. Blast walls
 LI  7.4.f.5. Deluge system
 LI  7.4.f.6. Water curtain
   LI 7.4.17. Enclosure
   a 7.4.18. Neutralization
   a 7.4.19. None
   LI 7.4.110. Other (specify) (maximum 200 characters)
 7.4.g. Monitoring/detection systems in use (select at least one)
 LI  7.4.g.1. Process area detectors                        LI 7.4.g.4. Other (specify) (maximum 200 characters)
 LI  7.4.g.2. Perimeter monitors
 a  7.4.g.3. None                                        	
EPA Form 8700-25 (Date 2/1999)
Page 7-2
                                                                          Are you claiming confidential business
                                                                                  information in this section?

-------
  xvEPA
 Risk Management Plan
Facility Name:
      Section 7. Prevention Program: Program 3
                                                    EPA Facility ID# (leave blank for first submission only)
7.4.h. Changes since last PHA or PHA update (select at
Q 7.4.M. Reduction in chemical inventory
Q 7.4.h.2. Increase in chemical inventory
Q 7.4.h.3. Change in process parameters
Q 7.4.h.4. Installation of process controls
Q 7.4.h.5. Installation of process detection systems
Q 7.4.h.6. Installation of perimeter monitoring systems
Q 7.4.h.7. Installation of mitigation systems
least one)
Q 7.4.h.8. None recommended
a 7.4A9. None
LI 7.4.h.10. Other (specify) (maximum 200


characters)



7.5 Date of most recent review or revision of operating
procedures
i i i i i i i i i i
MM D D Y Y Y
i
Y
 7.6 Training
7. 6. a. Date of most recent review or revision of training programs


i i i i i i i i i i i
MM DD YYYY

7.6.b. Type of training provided (select at least one)
a 7.6.b.1. Classroom
a 7.6.b.2. On the job
Q 7.6.b.3. Other (specify) (maximum 200 characters)







7.6.C. Type of competency testing used (select at least one)
LI 7.6.C.1. Written test Q
a 7.6.C.2. Oral test a
Q 7.6.C.3. Demonstration

7.6.C.4. Observation
7.6.C.5. Other (specify) (maximum 200 characters)


 7.7. Maintenance
 7.7.a. Date of most recent review or revision of maintenance procedures
                                                     i   i   i   i  i   i   i   i   i   i   i
                                                      MM     DD     YYYY
 7.7.b. Date of most recent equipment inspection or test
                                                     i   i   i   i  i   i   i   i   i   i   i
                                                      MM     DD     YYYY
 7.7.c. Equipment most recently inspected or tested (list equipment) (maximum 200 characters)
EPA Form 8700-25 (Date 2/1999)
Page 7-3
                                                             Are you claiming confidential business
                                                                   information in this section?

-------
  xvEPA
 Risk Management Plan
Facility Name:
      Section 7. Prevention Program: Program 3
 7.8. Management of Change
                                               EPA Facility ID# (leave blank for first submission only)
7
7
7
7
7
7
8. a. Date of most recent change that triggered
8.b. Date of most recent review or revision of
9. Date of most recent pre-startup review
10. Compliance audits
10. a. Date of most recent compliance audit
10.b. Expected or actual date of completion of
management of change procedures
i i i i i i
MM D D
management of change procedures
i i i i i i
MM D D
i i i i i i
MM D D

1 1 1 1 1 1
MM D D
all changes resulting from the compliance audit
i i i i i i
MM D D
i i i i i
Y Y Y Y
1 1 1 1 1
Y Y Y Y
1 1 1 1 1
Y Y Y Y

1 1 1 1 1
Y Y Y Y
1 1 1 1 1
Y Y Y Y
 7.11. Incident investigation
7


7


1 1.a. Date of your


1 1.b. Expected or


most recent incident investigation (if any)
i i i i i i
MM D D
actual date of completion of all changes resulting from the incident investigation
i i i i i i
MM D D

I I I I I
Y Y Y Y

I I I I I
Y Y Y Y

7


12. Date of most


recent review or revision of employee participation plans
i i i i i i
MM D D

I I I I I
Y Y Y Y

7


13. Date of most


recent review or revision of hot work permit procedures
i i i i i i
MM D D

I I I I I
Y Y Y Y

7


14. Date of most


recent review or revision of contractor safety procedures
i i i i i i
MM D D

I I I I I
Y Y Y Y

7


15. Date of most


recent evaluation of contractor safety performance
i i i i i i
MM D D

I I I I I
Y Y Y Y
EPA Form 8700-25 (Date 2/1999)
Page 7-4
                                                      Are you claiming confidential business
                                                            information in this section?

-------
  vvEPA
Facility Name:
                                                Risk Management  Plan
       Section 8. Prevention Program: Program 2
                                                          EPA Facility ID# (leave blank for first submission only)
        : you need to report more than one prevention program, make a photocopy of pages 8-1 through 8-4 and report each separately)
 Prevention program description:
 8.1. NAICS Code for process:
                           I   I   I   I    I   I   I
 8.2. Chemical name(s):
 (maximum 100 characters)
             If you need more space to list chemicals, please make a photo copy of this sheet.

 8.3. Safety information
 8.3.a. Date of most recent review or revision of safety information
                                                        i   i   i   i   i    i   i   i   i   i    i
                                                         MM      DD     YYYY
8.3.b. Federal/state regulations or industry-specific design codes and standards used to demonstrate
     compliance with the safety information requirement (select at least one)
a 8.3.b.1. NFPA 58 (or state law based on NFPA 58)        Q 8.3.b.7. Other (specify) (maximum 200 characters)
a 8.3.b.2. OSHA(29CFR 1910.111)
a 8.3.b.3. ASTM Standards                            	
a 8.3.b.4. ANSI Standards
a 8.3.b.5. ASME Standards
a 8.3.b.6. None
                                                     8.3.b.8. Comments (maximum 100 characters)
EPA Form 8700-25 (Date 2/1999)
                                               Page 8-1
                                                                    Are you claiming confidential business
                                                                           information in this section?

-------
  vvEPA
Facility Name:
 Risk Management  Plan
                                                                                               i  i   i
        Section 8. Prevention Program: Program 2
                                                              EPA Facility ID# (leave blank for first submission only)
 8.4. Hazard review
 8.4.a. Date of completion of most recent hazard review or update
                                                            i   i    i   i    i   i    i   i   i    i   i
                                                             MM      DD      YYYY
 8.4.b. Expected or actual date of completion of all changes resulting from the hazard review
                                                            i   i    i   i    i   i    i   i   i    i   i
                                                             MM      DD      YYYY
 8.4.c. Major hazards identified (select at least one)
 LI  8.4.C.1. Toxic release
 a  8.4.C.2. Fire
 LI  8.4.C.3. Explosion
 LI  8.4.C.4. Runaway reaction
 LI  8.4.C.5. Polymerization
 LI  8.4.C.6. Overpressurization
 LI  8.4.C.7. Corrosion
 a  8.4.C.8. Overfilling
 LI  8.4.C.9. Contamination
 LI  8.4.C.10.  Equipment failure
   LI 8.4.C.11.  Loss of cooling, heating, electricity,
              instrument air
   LI 8.4.C.12. Earthquake
   a 8.4.C.13. Floods (flood plain
   a 8.4.C.14. Tornado
   LI 8.4.C.15. Hurricanes
   LI 8.4.C.16. Other (specify) (maximum 200 characters)
 8.4.d. Process controls in use (select at least one)
 a  8.4.d.1. Vents
 a  8.4.d.2. Relief valves
 a  8.4.d.3. Check valves
 a  8.4.d.4. Scrubbers
 a  8.4.d.5. Flares
 a  8.4.d.6. Manual shutoffs
 LI  8.4.d.7. Automatic shutoffs
 a  8.4.d.8. Interlocks
 LI  8.4.d.9. Alarms and procedures
 a  8.4.d.10. Keyed bypass
 LI  8.4.d.11. Emergency air supply
 LI  8.4.d.12. Emergency power
   a 8.4.d.13. Backup pump
   LI 8.4.d.14. Grounding equipment
   LI 8.4.d.15. Inhibitor addition
   a 8.4.d.16. Rupture disks
   LI 8.4.d.17. Excess flow device
   LI 8.4.d.18. Quench system
   LI 8.4.d.19. Purge system
   a 8.4.d.20. None
   LI 8.4.d.21. Other (specify) (maximum 200 characters)
EPA Form 8700-25 (Date 2/1999)
Page 8-2
                                                                         Are you claiming confidential business
                                                                                 information in this section?

-------
  xvEPA
                                             Risk Management  Plan
Facility Name:
       Section 8. Prevention Program:  Program 2
                                                           EPA Facility ID# (leave blank for first submission only)
 8.4.e. Mitigation systems in use (select at least one)
 Q 8.4.e.1. Sprinkler system
 a 8.4.e.2. Dikes
 a 8.4.e.3. Firewalls
 a 8.4.e.4. Blast walls
 Q 8.4.6.5. Deluge system
 LI 8.4.e.6. Water curtain
 Q 8.4.6.7. Enclosure
                                                  8.4.6.8. Neutralization
                                                  8.4.6.9. None
                                                  8.4.6.10. Other (specify) (maximum 200 characters)
 8.4.f. Monitoring/detection systems in use (select at least one)
8.4.f.1. Process area detectors
8.4.f.2. Perimeter monitors
8.4.f.3. None
                                                      8.4.f.4. Other (specify) (maximum 200 characters)
8.4.g. Changes since last hazard review or hazard reviev
Q 8.4.g.1. Reduction in chemical inventory
Q 8.4.g.2. Increase in chemical inventory
Q 8.4.g.3. Change in process parameters
Q 8.4.g.4. Installation of process controls
Q 8.4.g.5. Installation of process detection systems
Q 8.4.g.6. Installation of perimeter monitoring systems
Q 8.4.g.7. Installation of mitigation systems
\i update (select at least one)
Q 8.4.g.8. None recommended
a 8.4.g.9. None
LI 8.4.g.10. Other (specify) (maximum 200


characters)



8.5. Date of most recent review or revision of operating
procedures
i i i i i i i i
MM D D Y Y
i i i
Y Y
 8.6. Training
8.6.a.
Date of most recent
review or revision of training programs
i i i i i i i i i i i
MM DD YYYY
 8.6.b. Type of training provided (select at least one)
 a 8.6.b.1. Classroom
 a 8.6.b.2. On the job
 Q 8.6.b.3. Other (specify) (maximum 200 characters)
EPA Form 8700-25 (Date 2/1999)
                                             Page 8-3
                                                                    Are you claiming confidential business
                                                                            information in this section?

-------
SEPA Risk Management Plan
Facility Name: — ' — ' — ' —
1 1 1 - 1 1 1
EPA Facility ID# (leave blank for first submission only)
Q Section 8. Prevention Program: Program 2
8.6.c. Type of competency test used (select at least one)
a 8.6.C.1. Written test Q 8.6.C.5. Other (specify) (maximum 200 characters)
a 8.6.C.2. Oral test
Q 8 6 r* 3 Ppmonstrstion
a 8.6.C.4. Observation


8.7. Maintenance
8. 7. a. Date of most recent review or revision of maintenance procedures
iii i
MM D
8.7.b. Date of most recent equipment inspection or test
iii i
MM D
i i i i i i
D Y Y Y Y
1 1 1 1 1 1
D Y Y Y Y
8.7.C. Equipment most recently inspected or tested (list equipment) (maximum 200 characters)
8.8. Compliance audits
8. 8. a. Date of most recent compliance audit
iii i
MM D
1 1 1 1 1 1
D Y Y Y Y
8.8.b. Expected or actual date of completion of all changes resulting from the compliance audit
iii i i i i i i i
MM D
D Y Y Y Y
 8.9.  Incident investigation
8.9.a.
8.9.b.
Date of your most recent incident investigation (if any)
Expected or actual date of completion of all changes resulting from
i i i i i i i i i i
MM D D Y Y Y
the incident investigation
i i i i i i i i i i
MM D D Y Y Y

Y

Y

8.10.
Date of most recent change that triggered a review or a revision of safety information, the hazard
review, operating or maintenance procedures, or training
i i i i i i i i i i i

MM D D Y Y Y
Y
EPA Form 8700-25 (Date 2/1999)
Page 8-4
                                                                                          Are you claiming confidential business
                                                                                                   information in this section?

-------
  vvEPA
Facility Name:
    Risk Management Plan
  !• Section 9. Emergency Response
                                                       EPA Facility ID# (leave blank for first submission only)
 9.1. Written emergency response (ER) plan
9.1. a. J Is your facility included in the written community emergency response plan?
9.1.b. J Does your facility have its own written emergency response plan?

9.2.
J Does your facility's ER plan include specific actions to be taken in response to accidental releases of
regulated substance(s)?

9.3.
J Does your facility's ER plan include procedures for informing the public and
to accidental releases?
local agencies responding

9.4.
J Does your facility's ER plan include information on emergency health care?


9.5.
Date of most recent review or update of your facility's ER plan
i i i i
M M
i i i i i i i
D D Y Y Y Y

9.6.
Date of most recent ER training for your facility's employees
i i i i
M M
I I I I I I I
D D Y Y Y Y
 9.7. Local agency with which your facility's ER plan or response activities are coordinated
 9.7.a. Name of agency (maximum 35 characters)
 9.7.b. Phone number
                           I   I   I/I  I   I    I I   I   I   I   I
 9.8. Subject to (select all that apply)
 a 9.8.a. OSHA Regulations at 29 CFR 1910.38
 a 9.8.b. OSHA Regulations at 29 CFR 1910.120
 a 9.8.C. Clean Water Act Regulations at 40 CFR 112
 a 9.8.d. RCRA Regulations at 40 CFR 264, 265, 279.52
 a 9.8.e. OPA-90 Regulations  at 40 CFR 112, 33 CFR 154, 49 CFR 194, 30 CFR 254
 a 9.8.f. State EPCRA Rules or Laws
 LI 9.8.g. Other (specify) (maximum 200 characters)
EPA Form 8700-25 (Date 2/1999)
Page 9-1
                                                                Are you claiming confidential business
                                                                       information in this section?

-------

-------
                                                                       APPENDIX B
                                                           Form Approved: February 22, 1999
                                                           OMB Control Number: 2050-0144
                       ELECTRONIC WAIVER FORM
Facility Name:
EPA Facility ID#:
(Leave blank for first submission only)
 Risk Management Plan Electronic Waiver Form

 Note: check all that apply.

 (1)    The reason(s) I am not submitting in electronic format is:
        •      I have no computers on site
              The software is incompatible (Ex: I only have access to a Macintosh computer)
        •      Other (specify)	
 (2)    I considered alternative means to file electronically (visiting a local copy store which
 rents computers, going to my State or local government office to use their computer, etc.), but
 for the following reason I am not submitting in electronic format:
        •      No commercial or public computer access available within 5 miles
              Contractor costs too great
        •      Computer use rental/lease costs too great
              No trained personnel
        •      Other (specify)	
 Signature                                      Print Name
 Title                                          Date
EPA Form 8700-26 (Date 2/1999)
RMP*Submit User Manual   February 1999                                      Appendix B  B-l

-------

-------
                                                                             APPENDIX C
                     SAMPLE CERTIFICATION LETTERS
 Certification Statement for Program 1 Process(es):

 Based on the criteria in 40 CFR 68.10, the distance to the specified endpoint for the worst-case
 accidental release scenario for the following process(es) is less than the distance to the nearest public
 receptor:

 •       [insert description for first program 1 process from executive summary]

 •       [insert description for second program 1 process from executive summary]]

 •       etc.

 Within the past five years, the process(es) has (have) had no accidental release that caused offsite
 impacts provided in the risk management program rule (40 CFR 68.10(b)(l)). No additional measures
 are necessary to prevent offsite  impacts from accidental releases. In the event of fire, explosion, or a
 release of a regulated substance from the process(es), entry within the distance to the specified endpoints
 may pose a danger to public emergency responders. Therefore, public emergency responders should not
 enter this area except as arranged with the emergency contact indicated in the RMP. The undersigned
 certifies that, to the best of my knowledge, information, and belief, formed after reasonable inquiry, the
 information submitted is true, accurate, and complete.
 Signature                                          Print Name
 Title                                              Date
 Certification Statement for Program Level 2 & 3 Processes:

 To the best of the undersigned's knowledge, information, and belief formed after reasonable inquiry, the
 information submitted is true, accurate, and complete.
 Signature                                          Print Name
 Title                                              Date
RMP* Submit User Manual   February 1999                                          Appendix C   C-l

-------
 Certification Statement for a Correction:

 To the best of the undersigned's knowledge, information, and belief formed after reasonable inquiry,
 these corrections and/or administrative changes are true, accurate, and complete.
 Signature                                           Print Name
 Title                                                Date
 EPA Facility ID #
RMP* Submit User Manual   February 1999                                           Appendix C  C-2

-------
                                                                               APPENDIX D
                                                                  Form Approved: February 22, 1999
                                                                  OMB Control Number: 2050-0144

                           CBI SUBSTANTIATION FORM

       If you are claiming Confidential Business Information (CBI) in your Risk Management plan
(RMP), you must substantiate your claim at the same time that you submit your RMP.  To qualify for CBI
protection, the substantive criteria in 40 CFR 2.301 must be met.  Certain RMP data elements cannot be
claimed CBI, as stated in 40 CFR 68.151.
 Fill out this form for each data element or set of data elements that have a discrete substantiation. You
 may use one CBI Substantiation Form to report multiple data elements as CBI if the basis for
 substantiation is the same.  That means the answers to the questions in Part IV must be the same for all
 the data elements. If you need more space in Part III, please attach a separate piece of paper.
Burden Statement
       The public reporting and recordkeeping burden for this collection of information is estimated to
average 8.5 hours per claim. Burden means the total time, effort, or financial resources expended by
persons to generate, maintain, retain, or disclose or provide information to or for a Federal agency. This
includes the time needed to review instructions; develop, acquire, install, and utilize technology and systems
for the purposes of collecting, validating, and verifying information, processing and maintaining
information, and disclosing and providing information; adjust the existing requirements; train personnel to
be able to respond to a collection of information; search data sources; complete and review the collection of
information; and transmit or otherwise disclose the information. An agency may not conduct or sponsor,
and a person is not required to respond to, a collection of information unless it displays a currently valid
OMB control number.

       Send comments on the Agency's need for this information, the accuracy of the provided burden
estimates, and any suggested methods for minimizing respondent burden, including through the use of
automated collection techniques to the Director, OPPE Regulatory Information Division, U.S.
Environmental Protection Agency (2137), 401 M  St., S.W., Washington D.C. 20460.  Include the OMB
control number in any correspondence. Do not send the completed CBI substantiation to this address.

Part I  ~ Facility Identification Information
The information given here must correspond to the information that you provided in the registration section
of your RMP.  If you have an EPA Facility ID #,  please include this  information. If you are resubmitting,
updating or correcting your RMP, you should already have received an EPA Facility ID#.	
 a. Facility Name:
 b. EPA Facility ID # (if assigned):
EPA Form 8700-27 (Date 2/1999)
RMP* Submit User Manual - February 1999                                            Appendix D  D-1

-------
c. Facility Location Address:
d. City, State and Zip Code:
e. Dun and Bradstreet Number:
Part II - Is this substantiation a sanitized or an unsanitized version?
If this substantiation contains any CBI, you must also submit a sanitized substantiation (without CBI
data) as stated in 40 CFR 68.152. In this case, submit 2 copies of this form, one sanitized and one
unsanitized. Please indicate here whether this form is sanitized or unsanitized.
Sanitized • Unsanitized
Part III - List the RMP Data Elements which you are claiming CBI that are covered in this
substantiation form. List the data element number and its descriptive name, but NOT the actual
CBI data. Please note that you may use one substantiation form for more than one data element only if
the answers to all of the questions in Part IV are the same for those data elements.
Data Element #









Data Element Name









EPA Form 8700-27 (Date 2/1999)
RMP* Submit User Manual - February 1999
Appendix D D-2

-------
 Part IV - The following are criteria set forth in 40 CFR §§ 2.204, 2.208 and 2.301 for
 substantiating CBI claims.  Provide answers to each of the following questions to substantiate your
 claim.  If you need additional space, use separate sheets of paper.
 (a)    For any data elements that you wish to claim CBI that are listed in Part III, please indicate
        whether your business has previously submitted a CBI claim for this data element to EPA
        and whether that claim has expired, been waived, or been withdrawn.
 (b)    What reasonable measures have you taken to protect the confidentiality of the information
        and do you intend to continue to take these measures?
EPA Form 8700-27 (Date 2/1999)
RMP* Submit User Manual - February 1999                                            Appendix D  D-3

-------
 (c)     Have you disclosed the information to anyone other than a governmental body? If so, why
        should the information still be considered confidential? If not, is the information
        reasonably obtainable without your consent?  Has EPA or another Federal agency made a
        determination as to the confidentiality of the information? If so, please attach a copy of the
        determination.
 (d)    Does any statute require public disclosure of the information for which you are claiming
        CBI?  If so, identify the law.
EPA Form 8700-27 (Date 2/1999)
RMP* Submit User Manual - February 1999                                           Appendix D  D-4

-------
 (e)
(1)  For each data element claimed as CBI in Part III, discuss with specificity why release
of the information is likely to cause substantial harm to your competitive position. Explain
the nature of those harmful effects, why they should be viewed as substantial, and the
causal relationship between disclosure and such harmful effects. For example, how could
your competitors make use of this information to your detriment?
        (2) Do you assert that the information is "voluntarily submitted" as defined at 40 CFR
        2.201(i)?  If so, explain why, and how disclosure would tend to lessen the Governments's
        ability to obtain necessary information in the future.
 Part V - Certification (Read and sign after completing all sections)
 To the best of the undersigned's knowledge, information, and belief formed after reasonable inquiry, the
 information submitted is true, accurate, and complete.
 Name and official title of owner or operator or senior management official
Signature (All signatures must be original)
Official Title
Print Name
Date Signed
EPA Form 8700-27 (Date 2/1999)
RMP* Submit User Manual - February 1999
                                                                      Appendix D  D-5

-------

-------
                                                                         APPENDIX E
                                                             Form Approved: February 22, 1999
                                                             OMB Control Number: 2050-0144


              CBI UNSANITIZED DATA ELEMENT FORM

If you are claiming Confidential Business Information (CBI) in your RMP, you must submit in paper form
both the information being claimed CBI and a substantiation for your claim at the time you submit your
redacted or "sanitized" RMP .  This form should be used to submit the confidential information. The
redacted RMP will be made available to the public in RMP*Info.

If you need additional space, make a copy of page 2 of this form.

Part I.  Facility Identification Information
The information given here should correspond to the information that you filled out in the registration
section of your RMP. If you have an EPA Facility ID#, please include this information. You will have
received the number after your first submission.
a. Facility Name:


b. EPA Facility ID # (if assigned): - - - - _wwww _ « « « «
c. Facility Location Address:
d. City, State and Zip Code:
e. Dun and Bradstreet Number:
Part II - Information claimed as CBI
Please list the data element number(s) from the RMP form (paper form or electronic form), the name(s)
of the element(s) you are claiming CBI, and the actual CBI data.
Data Element
Number


Name of Data Element


RMP Data Claimed as CBI


EPA Form 8700-28 (Date 2/1999)
RMP* Submit User Manual - February 1999
Appendix E  E-l

-------
 Data Element
  Number
Name of Data Element
RMP Data Claimed as CBI
EPA Form 8700-28 (Date 2/1999)
RMP* Submit User Manual - February 1999
                                                          Appendix E  E-2

-------
                                                                               APPENDIX F


  HOW TO REPORT YOUR FACILITY LATITUDE AND LONGITUDE

There are four data elements to report for latitude and longitude:
        l.S.g. Latitude
        l.S.h. Longitude
        1.51  Lat/Long Method
        1.5.j.  Lat/long Description

^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^sfcsfcsfcsfcsfcsfcsfcsfcsfcsfcsfcsfcsfcsfcsfc
                                   Choosing your Description

You will first  need to choose your Lat/Long "Description" which represents the exact location of your
latitude and longitude values.  The most common Lat/Long "Descriptions" are "PG" for Plant Gate or
entrance and "CE" indicates the CEnter of your facility. RMP* Submit and the User Manual contain a list
of codes to be used for this element.

&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&&
                                    Choosing your Method

Next, you need to choose a "Method" for determining your Lat/Long. RMP*Submit and the User Manual
contain a list of codes to be used for this element. There are four general methods to determine your site
latitude and longitude: Global Positioning Systems (GPS); Geographic Information Systems (GIS);
Internet-based address finders; and paper maps.  These methods  are described below in order of accuracy
(GPS is the most accurate way to determine a lat/long, paper maps is the least accurate method). Although
it is preferable that you use the most accurate method available to you, all four methods are acceptable.

1.     Global Positioning Systems (GPS). If you have access to a GPS unit, take the reading at the
       place  specified by the Lat/Long "Description" that you  choose. Most GPS units allow you to
       choose between display in decimal degrees and degrees/minutes/seconds. You should choose
       degrees/minutes/seconds, since that is the required format for latitude and longitude. If you can
       only get the reading in decimal degrees, you will have to convert it (see conversion instructions
       below or RMP*Submit's conversion tool).

       To answer l.S.i. "Method" for determining Lat/Long , enter one of the values "Gl" through
       "G7"  from the list which represent specific types of GPS unit, or "GO" (GPS-Other/ unspecified).

2.     Geographic Information Systems (GIS). If you have your own GIS, navigate to your street and
       pinpoint the  exact location that you choose for your Lat/Long "Description" field (1.5.J). Your
       GIS should report (usually on a status bar) the latitude and longitude of the  focus point or map
       marker. Your GIS should also allow a preference for display in degrees/minutes/seconds rather
       than decimal degrees.  If you can only get the reading  in decimal degrees, you will have to convert
       it (see conversion instructions below or RMP*Submit's conversion tool).
       If you do not own a GIS,  you can download a free "mini" GIS system called LandView™. It will
       give you a map of your county with lat/long coordinates. Visit the CEPPO Homepage  at

RMP* Submit User Manual- February 1999                                            Appendix F  F-l

-------
       http://www.epa.gov/ceppo/tools.html for more information.

       To answer l.S.i. "Method" for determining Lat/Long on your RMP, enter "14" which represents
       "Interpolation - Digital map source (TIGER): derived from a digital map, mapping software or
       mapping tool."
3.     Internet-based address finders. There are numerous Internet sites for viewing maps and finding
       specific locations. The one that seems best suited for quick determination of latitude and longitude
       is at:
                      http://www.etakguide.com/#FindLocation

       This system requests an address, and optionally a cross street.  Since exact address matching is not
       available for many parts of the country, supplying a cross street helps the system to draw a map
       that is near your location.  Once the map is drawn, click on the "Lat/Long" button above the map,
       then click on the map at the location that you choose for your Lat/Long "Description" field
       (l.S.j). The system will display the latitude and longitude in decimal degrees. You will have to
       convert to degrees/minutes/seconds (see conversion instructions below or RMP*Submit's
       conversion tool).  Other Internet-based mapping tools can be found at:

                      http://www.mapblast.com
                      http://tiger.census.gov/cgi-bin/mapbrowse-tbl

       To answer l.S.i. "Method" for determining Lat/Long, enter "14" which represents  "Interpolation
       - Digital map source (TIGER): derived from a digital map, mapping software or mapping tool."

4.     Paper maps. Choose a map that shows a relatively small area, and that has latitude/longitude tick
       marks along the edges. A county map book with a small section of the county on each page,  or a
       USGS topographic map is  ideal.  County map books are available in many public libraries,
       bookstores and office supply stores.  USGS maps are available in many libraries or may be
       purchased directly from the USGS by submitting a written request to:

               Distribution Branch of the USGS
               P.O. Box 25286
               Denver Federal Center
               Denver, CO 90225
               Phone: (303)236-7477.

       Do not use a common road atlas with one state map per page or state highway maps because  they
       generally show too large an area to obtain adequate latitude/longitude value.

       After finding your exact location on the map, see where that point lies in relation to the latitude and
       longitude tick marks.  Latitude runs north-south and longitude runs east-west. As an example, if
       your latitude is halfway between 38° 40'  00" (translated as  38 degrees, 40 minutes, 0 seconds),
       and 38° 50' 00", your latitude would be halfway between the two latitude values, or 38° 45'  00".
       If your latitude is three-quarters of the way between the two tick marks, it would be 38° 47' 30".
       Perform the same  exercise  to determine longitude.

RMP* Submit User Manual- February 1999                                             Appendix  F  F-2

-------
       To answer l.S.i. "Method" for determining Lat/Long, enter "II" which represents "Interpolation
       - Map: derived from a paper or other non-digital map."
                                Reporting Latitude and Longitude
Once you have your latitude and longitude values, you'll need to make sure they are in the proper format,
you will report latitude and longitude coordinates in "degrees, minutes, and seconds."

The format for the RMP is: Latitude: +/-D D MM S S  . S     Longitude:  +/-D D D  MM  S S . S

Enter only numerical data.  Do not preface numbers with letters such as N or W to denote the hemisphere.
For RMP* Submit, the default for the hemisphere is "+" for east and north. However because "+" is
assumed by the system, you must leave that space blank for east and north. For west and south, enter a
negative,"-," as the first character. Enter both latitude and longitude to the nearest second.

Be careful not to  reverse your latitude and longitude coordinates. Latitude in the 48 contiguous states
ranges from 25° to 49°, while longitude ranges from 72° to 124°.
                      Converting decimal degrees to degrees/minutes/seconds
If your GIS, GPS, or Internet-based mapping tool provides latitude and longitude only in decimal degrees,
you must convert to degrees/minutes/seconds.  RMP* Submit has an automatic latitude/longitude
conversion utility.

These instructions use the following decimal degree values as an example:
       latitude        38.327654  [38.327654 degrees North Latitude]
       longitude      -98.887435  [98.887435 degrees West Longitude]

Step one:  The value for Degrees is the same for both decimal degrees and degrees/minutes/seconds.  Use
the number to the left of the decimal point for degrees.  Reserve the remainder (after the decimal point) for
steps two and three. For this example,
       latitude degrees =       38    [38 degrees North Latitude]
       longitude degrees =     -98    [98 degrees West Longitude]

Step two: The value for Minutes is the decimal portion of the degrees times 60.  For this example,
       latitude minutes:        60 minutes times .327654 = 19.65924, or 19 minutes
       longitude minutes:       60 minutes times .887435 = 53.2461,  or 53 minutes.

Use the numbers to the left of the decimal point for minutes.  The remainder to the right of the decimal
point are used to determine the seconds.
Step three: The value for Seconds is the decimal portion of the minutes calculation times 60. For this
example,
       latitude seconds:        60 seconds times .65924 = 39.5544 seconds

RMP* Submit User Manual- February 1999                                            Appendix F  F-3

-------
       longitude seconds:      60 seconds times .2461 = 14.766 seconds

If your result contains more than one decimal place, you should round to a single decimal place.

End Result: The coordinates in degrees/minutes/seconds for this example are
       latitude:         38° 19' 39.6"         [38 degrees 19 minutes 39.6 seconds north latitude]
       longitude      -98° 53' 14.8"         [98 degrees 53 minutes 14.8 seconds west longitude]
RMP* Submit User Manual- February 1999                                             Appendix F  F-4

-------
                                                                            APPENDIX G
                              STATE RMP CONTACTS
Alaska (currently, is not be seeking delegation)
John Stone
Alaska Department of Environmental
Conservation, Air Division
410 Willoghby Avenue, Suite 105
Juneau,AK 99801-1795
phone 907-465-5103
jstone@envircon.state.ak.us

Arizona (will not be seeking delegation)
Daniel Roe, Executive Director
AZ State Emergency Response Commission
(AZSERC)
5636 East McDowell Road
Phoenix, AZ 85008
phone 602-231-6345
fax   602-392-7519
roed@dem.state.az.us

California (will be seeking delegation)
Steve DeMello
CA Office of Emergency Services
P.O. Box 419047
Rancho Cordova, CA 95741-9047
phone 916-464-3281
fax   916-464-3205
Steven_DeMello@oes.ca.gov

Connecticut
Greg Fitzpatrick
Department of Environmental Protection
Bureau of Air Management
79 Elm St.
Hartford, CT 06106
phone 860-424-3962
fax   860-424-4063
Delaware (will be seeking delegation)
Robert Barrish/ Richard Antoff/ Jay Brabson
DE Department of Natural Resources
and Environmental Control
Division of Air and Waste Management
715 Grantham Lane
Newcastle, DE  19720
phone 302-323-4542
fax   302-323-4561/4598
bbarrish@state .de .us, rantoff@state.de .us
jbrabson@state.de .us

District of Columbia (will be seeking delegation)
Stan Tracey, Abraham Hagos
Air Quality Division
Environmental Health Administration
2100 Martin Luther King, Ave, S.E., Suite 203
Washington, DC  20020
phone 202-645-6093
fax   202-645-6102
stracey@mail .environ, state .dc .us
ahagos@mail.environ.state.dc.us

Florida (will seek delegation for all sources,
except those with propane as their only regulated
substance and covered process)
Dept. of Community Affairs
FL Division of Emergency Management
2555 Shumard  Oak Boulevard
Tallahassee, Fla.  32399
phone 850-413-9970
fax   850-488-1739

Georgia
Kent Howell
Georgia Dept. of Natural  Resources
Environmental Protection Division
7 M.L. King Jr. Drive, Suite 139
Atlanta, Ga. 30334
phone 404-656-6905
fax   404-657-7893
kent_howell@mail.dnr.state.ga.us
RMP* Submit User Manual- February 1999
                            Appendix G   G-l

-------
Hawaii (will be doing partial implementation and
will seek delegation in 2000)
Marsha Graf
Hawaii State Department of Health
919 Ala Moana Blvd., Rm 206
Honolulu, Hawaii 96814-4912
phone 808-586-4694
fax   808-586-7537
mgraf@eha.health.state .hi.us@IN

Kentucky - Jefferson County
Art Williams
Air Pollution Control District of Jefferson
County
850 Barrett Avenue, Suite 200
Louisville, KY 40204
502 574-6000 phone
502 574-5306 fax
awilliam@iglou.com

Mississippi (is seeking delegation)
Danny Jackson
Mississippi Dept. of Environmental Quality
Office of Pollution Control, Air Division
P.O. Box 10385
Jackson, Ms.  39289-0385
phone 601-961-5225
fax   601-961-5725
Jackson_Danny@deq. state .ms .us

Nevada (will be seeking delegation)
Mark Zusy, P.E.
Nevada Department of Conservation and Natural
Resources
Division of Environmental Protection
333 W. Nye Lane, Room 138
Carson City, NV 89706-0851
phone 702-687-4670 x3012
fax   702-687-6396
mzusy@ndep.carson-city.nv.us
New Jersey
Reginald Baldini
NJ Bureau of Chemical Release Information and
Prevention
22 South Clinton Avenue
P.O. Box 424
Trenton, N.J. 08625-0424
phone 609-633-7289
fax   609-633-7031
sschiffman@dep. state .nj .us

North Carolina (will be seeking delegation)
Mike Chapman
NC Dept of Environment
P.O. Box 29580
Raleigh, N.C. 27626-0580
phone 919-715-3467
fax   919-733-1812
michael_chapman@ncair.net

North Carolina - Forsvth County
Carol Curran / Keith Tart
Forsyth County Environmental Affairs Dept.
537 North Spruce  Street
Winston-Salem, N.C. 27101-1362
phone 336-727-8060
fax   336-727-2777
currancm@co. forsyth .nc .us.
tartkf@co .forsyth .nc .us

North Carolina - Asheville/ Western NC
Regional Air Pollution Control Agency
James L. Cody
49 Mt. Carmel Road
Asheville, North Carolina 28806
phone(704)255-5655
fax   (704) 255-5226

Oregon (currently, is not be seeking delegation)
John Kinney
Oregon Department of Environmental Quality
Air Quality Division
811 Sw Sixth Avenue
Portland, OR 97204
phone 503-229-6819
Kinney.John@deq.state.or.us
RMP* Submit User Manual- February 1999
                            Appendix G  G-2

-------
Pennsylvania - Allegheny County (will be
seeking delegation)
Tom Puzniak
Allegheny County Health Department
Bureau of Air Pollution Control
301 39th Street
Pittsburgh, PA  15201
phone 412-578-8319 or 7960
fax   412-578-8144
TJPUZ1 @Bellatlantic .net

Pennsylvania - Philadelphia
Thomas Huynh
Air Management Services
Spelman Building, 2nd Floor
321 University Avenue
Philadelphia, PA  19104
phone 215-685-7572
fax   215-685-7593
THOMAS .HUYNH@PHILA.GOV

Puerto Rico
Nelson Moreno, Program Manager
Puerto Rico Environmental Quality Board
Air Program
Ponce de Leon Avenue #431
Hatorey, Puerto Rico 00917
phone 787-767-8025

Rhode Island
Gina Friedman
Dept. of Environmental Management
Division of Air Resources
291 Promenade St.
Providence, RI  02908
phone 401-222-2808 Ext. 7016
fax   401-222-2017

South Carolina
Rhonda B. Thompson
Bureau of Air Quality Control
SC Dept of Health and Environmental Health
2600 Bull Street
Columbia, S.C. 29201-1708
phone 803-898-4391
fax   803-898-4117
thompsrb@columb31 .dhec.state.sc.us
Virgin Islands
Leonard Reed
Virgin Islands Department of Planning and
Natural Resources
Bldg. 1118, Water Gut Homes
Christiansted, St. Croix
U.S. Virgin Islands 00820
phone 340-774-3320

Washington (currently, is not be seeking
delegation)
Peter Lyons
Washington Deptartment of Ecology
Air Quality Program
PO Box 47600
Olympia,WA  98504-7600
phone 360-407-7530
fax   360-407-6802

John Ridgway
Washington Department of Ecology
Community Right-to-Know Unit
PO Box 47659
Olympia,WA  98504-7659
phone 360-407-6713
fax   360-407-6715
jrid461 @ecy .wa.gov
RMP* Submit User Manual- February 1999
                            Appendix G  G-3

-------

-------
                                                                              APPENDIX H
                        EPA REGIONAL RMP CONTACTS
REGION 1
Office of Environmental Stewardship (SPP)
JFK Federal Building
One Congress St.
Boston, MA. 02203-2211
(617) 565-9232
(617) 565-4939 FAX
Email: dinardo.ray@epa.gov

REGION 2
Emergency Response and Remedial Division (MS211)
2890 Woodbridge Avenue
Edison, NJ 08837-3679
(732) 321-6620
(732) 321-4425 FAX
Email: ulshoefer.john@epa.gov

REGION 3
CEPP and Site Assessment Section (3HS33)
1650 Arch Street
Philadelphia, PA 19103-2029
(215)-814-3033
(215)-814-3254FAX
Email: shabazz.mikal@epamail.epa.gov

REGION 4
Air Pesticides and Toxics Management Division
Atlanta Federal Center
6 IForsyth Street, SW
Atlanta, GA 30303
(404) 562-9121
(404) 562-9095 FAX
Email: patmon.michelle@epa.gov

REGION 5
Superfund Division (SC6J)
77 W.Jackson Blvd.
Chicago, IL 60604
(312)886-4061
(312) 886-6064 FAX
Email: mayhugh.robert@epa.gov
REGION 6
Superfund Division (6SF-RP)
1445 Ross Avenue
Dallas, TX 75202-2733
(214) 665-2292
(214) 665-7447 FAX
Email: mason.stephen@epa.gov

REGION 7
Air, RCRA, and Toxics Division (ARTD/TSPP)
726 Minnesota Ave.
Kansas City, KS 66101
(913)551-7876
(913) 551-7065 FAX
Email: smith.marka@epa.gov

REGION 8
Ecosystems Protection and Remediation (8EPR-ER)
One Denver Place
999-18th Street, Suite 500
Denver, CO 80202-2405
(303)312-6760
(303) 312-6071 FAX
Email: benoy.barbara@epa.gov

REGION 9
Superfund Division (SFD-5)
75 Hawthorne Street
San Francisco, CA 94105
(415) 744-2320
(415) 744-1916 FAX

REGION 10
Emergency Response & Site Cleanup Unit (ECL-116)
Office of Environmental Cleanup
U.S. EPA Region 10
1200 Sixth Ave.
Seattle, WA 98101
206-553-0285
RMP* Submit User Manual- February 1999
                            Appendix H  H-l

-------

-------
                                                                             APPENDIX I


                 RMP*SUBMIT RELATED MATERIALS

Documents

In the following list, materials marked with an asterisk (*) can be downloaded directly from the Internet
homepage of EPA's Chemical Emergency Preparedness and Prevention Office (CEPPO) at
http://www.epa.gov/swercepp/acc-pre.html. Most are available in Adobe Portable Document Format
(PDF) — accessible with the free downloadable Adobe Acrobat Reader software, as text files, or in Corel
WordPerfect 6.1.  You can download a free Adobe Acrobat Reader from www.adobe.com. Alternatively,
one or more copies of documents developed by EPA may be ordered from EPA's National Center for
Environmental Publications and Information (NCEPI):

       US EPA/NCEPI
       PO Box 42419
       Cincinnati, OH 45242-2419
       Phone: (800)490-9198
       Fax: (513)489-8695
       www.epa.gov/epahome/publications

General Guidance for Risk Management Programs* (EPA 550-B98-003)
       This document provides guidance to help facility owners and operators determine if their processes
       are subject to regulation under section 112(r) of the Clean Air Act and 40 CFR part 68 and to help
       them comply with the regulations. An appendix to this document provides the latest, final
       regulatory text.

RMP Offsite Consequence Analysis  (OCA) Guidance* (EPA 550-B96-014)
       The OCA Guidance provides simple methods and reference tables for use in preparing both worst-
       case and alternate release scenarios. This document will be updated in early 1999.

CAA Section 112(r) Frequently Asked Questions.*
       This document is a list of commonly asked questions with answers provided by EPA.  Categories
       of questions include the General Duty Clause, applicability, program level screening, hazard
       assessment, prevention program, emergency response program, enforcement, and implementation.

Industry-Specific Risk Management Programs and Plans

       Generic guidance has been developed to help owners and operators of facilities in various
       industries comply with the RMP regulation. Each guidance includes sections on hazard assessment
       and emergency response, along with appendices relating to industry-specific issues. The following
       model plans have been developed by EPA and are available free of charge:

       •      Risk Management Program and Plan for Ammonia Refrigeration Facilities.* This
              guidance is intended for facilities with ammonia refrigeration systems  (e.g., food
              processors and distributors, refrigerated warehouses). The guidance covers only

RMP* Submit User Manual- February 1999                                           Appendix I  1-1

-------
               anhydrous ammonia and provides offsite consequence analyses that are specific to the
               ways in which ammonia is handled in an ammonia refrigeration system. Because virtually
               all covered ammonia refrigeration systems will be subject to either Program 1 or Program
               3, this document provides no guidance on the Program 2 prevention program. The EPA
               publication number is 550-B98-014.  It is available on the Internet at:
               http://www.epa.gov/swercepp/acc-pre.htmlffAmmonia

               RMP Guidance for Propane Storage Facilities.* This document (developed under an
               EPA grant by the State of Delaware)  is intended as comprehensive RMP guidance for
               large propane storage or distribution facilities who already comply with propane industry
               standards. This guidance assumes that propane is the ONLY regulated substance stored at
               the facility.  The EPA publication number is 550-B98-011.  It is available on the Internet
               at: http://www.epa.gov/swercepp/acc-pre.htmlffLong Propane

               RMP Guidance for Propane Users  and Small Retailers.* This document is intended as
               condensed guidance for smaller businesses who store or use propane and who already
               comply with propane industry standards.  The guidance and sample RMPs assume that
               propane is the ONLY regulated substance stored at the facility. It is intended as a
               "bare-bones" guidance for small businesses  - it includes sample RMPs for program 1 and
               2 facilities.  The EPA publication number is 550-B98-022. It  is available on the Internet
               at: http://www.epa.gov/swercepp/acc-pre.htmlffShort Propane

               Risk Management Program Guidance for Wastewater Treatment Plants.* This
               guidance document (developed with input from the Association of Metropolitan Sewerage
               Agencies (AMSA)) is intended for wastewater treatment plants (public and private) that
               use chlorine, sulfur dioxide, ammonia, methane, and propane.  It includes guidance specific
               to these substances as used and produced at wastewater treatment plants. The guidance
               provides chemical-specific offsite consequence analyses as well as industry-specific
               information on prevention programs.  The EPA publication number is 550-B98-010. It is
               available on the Internet at:
               http://www.epa.gov/swercepp/acc-pre.htmlffPOTW Guidance

               Risk Management Program Guidance for Warehouses* (January 1999)
               This guidance document (developed with input from the International Warehouse Logistics
               Association (PvVLA)) contains comprehensive  RMP implementation guidance for chemical
               warehouse owner/operators.  The guidance includes simplified methods for conducting
               offsite consequence analyses on regulated substances commonly handled and stored at
               warehouses, as well as industry-specific information on accident prevention programs.
               The EPA publication number is 550-B90-004. It is available on the Internet at:
               http://www.epa.gov/swercepp/acc-pre.htmlffWarehouses
RMP* Submit User Manual-  February 1999                                             Appendix I 1-2

-------
              Risk Management Program Guidance for Chemical Distributors* (January 1999)
              This guidance document (developed with input from the National Association of Chemical
              Distributors (NACD)) contains comprehensive RMP implementation guidance for owners
              and operators of chemical distribution facilities. The guidance includes simplified methods
              for conducting offsite consequence analyses on regulated substances commonly handled
              and stored at chemical distribution facilities, as well as industry-specific information on
              accident prevention programs.  The EPA publication number is 550-B99-005. It is
              available on the Internet at: http://www.epa.gov/swercepp/acc-pre.htmWDistributors
       The following model plans have been developed by other groups and may include a fee:

       •      Generic Risk Management Plan for Chlorine Packaging Plants and Sodium
              Hypochlorite Production Facilities (Chlorine Institute Pamphlet 162)  This document can
              be ordered for a fee from the Publications Coordinator, The Chlorine Institute, Inc., 2001
              L Street, NW, Washington, D.C. 20036, phone 202-775-2790, fax 202-223-7225.

       •      Model Risk Management Plan Guidance for Petroleum Refineries—Guidance for
              Complying with EPA's RMP Rule (40 Code of Federal Regulations 68), First  Edition,
              August 1997 (API Publication 760) This document can be ordered from the American
              Petroleum Institute, Order Desk, 1220 L Street, NW, Washington, DC 20005.

              Model Risk Management Plan Guidance for Exploration and Production
              Facilities-Guidance for Complying with EPA's RMP Rule (40 Code of Federal
              Regulations 68), First Edition, August 1997 (API Publication 761) This document can
              be ordered from the American Petroleum Institute, Order Desk, 1220 L Street, NW,
              Washington, DC 20005.

       •      Compliance Guideline for EPA's Risk Management Program Rule.  This document can
              be ordered from the Chemical Manufacturers Association Publications Fulfillment, PO
              Box 522, Annapolis Junction, MD 20701-0552, phone 301-617-7822.

       •      Compliance Guidance and Model Risk Management Program for Water Treatment
              Plants (AWWARF order number 90760) This document can be ordered from the
              American Waterworks Association Research Foundation, 6666 W. Quincy Ave., Denver,
              CO 80235, phone 303-347-6121.
RMP* Submit User Manual- February 1999                                            Appendix I  1-3

-------
Electronic Resources

CEPPO Homepage
       The CEPPO homepage at www.epa.gov/ceppo/ provides access to many of the documents listed
       above and includes links to information on accident prevention and risk management planning,
       EPCRA, CRTK, databases and software, and much more.

RMP*Submit™  Program and Instructions
       Software for the RMP* Submit program, installation and operation instructions, and the latest
       updates can be downloaded from the RMP* Submit homepage at:
       http://www.epa.gov/swercepp/rmp-dev.html. RMP*Submit can be ordered from NCEPI in
       either CD-ROM (EPA publication #: 550-C99-001) or diskettes (EPA publication #:
       550-C99-002).  Both CD-ROM and diskettes come with the RMP*Submit User Manual (EPA
       publication #: 550-B99-001).  The CD-ROM version also has RMP*Comp.

RMP*Comp™
       RMP*Comp is an electronic tool developed by the U.S. National Oceanic and Atmospheric
       Administration (NOAA) to simplify performing the offsite consequence analysis required under the
       RMP rule. The program guides you through the process of making an analysis and eliminates the
       need to make any calculations by hand. Software and installation and operation instructions can be
       downloaded from the NOAA website at:
       http://response.restoration.noaa.gov/chemaids/rmp/rmp.html

LandView™ III
       LandView III is a desktop mapping system.  It includes data compiled by EPA, the Bureau of the
       Census, and other federal agencies. Data is presented in a geographic context on maps displaying
       jurisdictional boundaries; networks of roads, rivers, and railroads; census block group and tract
       polygons; and other landmarks. Hardware and software requirements, prices, and ordering
       information are available from the Bureau of the Census website at
       www.census.gov/geo/www/tiger/lv3desc.html

Computer-Aided Management of Emergency Operations (CAMEO®  ) and Areal Location of
Hazardous Atmospheres (ALOHA®)
       CAMEO was developed jointly by EPA and the National Oceanic and Atmospheric Administration
       (NOAA) to help emergency planners and responders in government and industry plan for and
       mitigate chemical accidents.  The CAMEO software suite supports chemical emergency
       management with chemical safety and  emergency response data, digitized mapping, and air
       dispersion modeling; ALOHA is the air dispersion modeling component within CAMEO. A demo
       version of the software  is available from the National Safety Council website at
       www.nsc.org/ehc/cameo.htm. where you can also find out about system requirements, how to
       order CAMEO, and when CAMEO workshops and training are being held, as well as join the
       CAMEO User's Forum.
RMP* Submit User Manual- February 1999                                            Appendix I  1-4

-------
                                                                            APPENDIX J

                            3 DIGIT NAICS CODES
NAICS
Code  Business Activity
111    Crop Production
112    Animal Production
113    Forestry and Logging
114    Fishing, Hunting and Trapping
115    Support Activities for Agriculture and Forestry

211    Oil and Gas Extraction
212    Mining (except Oil and Gas)
213    Support Activities for Mining
221    Utilities
233    Building, Developing and General Contracting
234    Heavy Construction
235    Special Trade Contractors

311    Food Manufacturing
312    Beverage and Tobacco Product Manufacturing
313    Textile Mills
314    Textile Product Mills
315    Apparel Manufacturing
316    Leather and Allied Product Manufacturing
321    Wood Product Manufacturing
322    Paper Manufacturing
323    Printing and Related Support Activities
325    Chemical Manufacturing
326    Plastics and Rubber Products Manufacturing
327    Nonmetallic Mineral Product Manufacturing
331    Primary Metal Manufacturing
332    Fabricated Metal Product Manufacturing
333    Machinery Manufacturing
334    Computer and Electronic Product Manufacturing
335    Electrical Equipment, Appliance and Component Manufacturing
336    Transportation Equipment Manufacturing
337    Furniture and Related Product Manufacturing
339    Miscellaneous Manufacturing

421    Wholesale Trade, Durable Goods
422    Wholesale Trade, Nondurable Goods
441    Motor Vehicle and Parts Dealers
443    Electronics and Appliance Stores
444    Building Material and Garden Equipment and Supplies Dealers
445    Food and Beverage Stores
446    Health and Personal  Care Stores

RMP* Submit User Manual - February 1999                                         Appendix J    J-1

-------
447    Gasoline Stations
452    General Merchandise Stores
453    Miscellaneous Store Retailers
454    Nonstore Retailers

481    Air Transportation
482    Rail Transportation
483    Water Transportation
484    Truck Transportation
485    Transit and Ground Passenger Transportation
486    Pipeline Transportation
487    Scenic and Sightseeing Transportation
488    Support Activities for Transportation
491    Postal Service
493    Warehousing and Storage Facilities

511    Publishing Industries
512    Motion Picture and Sound Recording Industries
513    Broadcasting and Telecommunications
532    Rental and Leasing Services
541    Professional, Scientific and  Technical Services
561    Administrative and Support Services
562    Waste Management and Remediation Services

611    Educational Services
621    Ambulatory Health Care Services
622    Hospitals

712    Museums, Historical Sites and Similar Institutions
713    Amusement, Gambling and Recreation Industries
721    Accommodation
722    Foodservices and Drinking Places

811    Repair and Maintenance
812    Personal and Laundry Services

922    Justice, Public Order, and Safety
924    Administration of Environmental Quality Programs
927    Space Research and Technology
928    National Security and International Affairs
999    Unclassified Establishments
RMP* Submit User Manual - February 1999                                            Appendix J    J-2

-------