                               RECORD OF DECISION DECLARATION
                                  GROUNDWATER OPERABLE UNIT
                                     FINAL REMEDIAL ACTION

                                            Better Brite Site
                                              DePere, WI
Site Name and Location
The Better Brite Chrome and Zinc Shops are located about 2,000 feet apart at 519 Lande Street and 315 South Sixth
Street, respectively, in De Pere, Wisconsin.  The Chrome Shop property comprises 3.7 acres and the Zinc Shop
property comprises 0.61 acre. Both sites are situated approximately Vt mile west of the Fox River, and are in
primarily residential areas, with some light industrial land uses.

Statement of Basis and Purpose

This decision document represents the selected final remedial action for the Better Brite site.  This action was
developed pursuant to the Comprehensive Environmental Response, Compensation, and Liability Act of 1980
(CERCLA), as amended by the Superfund Amendments and Reauthorization Act of 1986 (SARA), and the National
Contingency Plan (NCP).  This decision is based on the administrative record for the site.

Assessment of the Site

Actual or threatened releases of hazardous substances from the site, if not addressed by implementing the remedial
action selected in this Record of Decision, may present an imminent and substantial danger to public health,
welfare, or the environment.

Description of the Remedy

The selected remedy for the groundwater, Alternative F, includes:

        • Moving the existing groundwater pretreatment equipment from the Chrome Shop to the Zinc Shop and
        constructing a new building to house it;

        • Continued removal, treatment and discharge to the sanitary sewer of contaminated groundwater from an
        existing groundwater collection sump at the Zinc Shop;

        • Conducting in-situ stabilization and/or solidification treatment of the chromium contaminated soils and
        groundwater at the Chrome Shop;

        • Continued groundwater monitoring; and

        • Implementation of proper institutional controls and site access restrictions.

The selected remedy for the basement/foundation drain exposure, Alternative BE, includes:

        • Sealing the interior access points of existing foundation drains;

        • Waterproofing existing exterior foundation walls;
                                                -  1  -

-------
        • Construction of new exterior building foundation drains with collected water treated at the Zinc Shop
        pretreatment facility;

        • Necessary predesign investigations of the structural integrity of the existing buildings near the zinc shop
        to determine if the above actions are feasible. If it is found that the buildings do not have the structural
        integrity to construct the actions, the actions will be modified to remove as much risk as possible without
        endangering building structural integrity;

        • Continued groundwater monitoring; and

        • Removal and proper treatment/disposal of any contaminated soil that pose health risks or could cause
        additional groundwater contamination near the Zinc Shop after a predesign soil investigation.

Statutory Determinations

This final remedy is protective of human health and the environment, complies with Federal and State requirements
that are legally applicable or relevant and appropriate to the  remedial action, and is cost effective. This remedy
satisfies the statutory preference for remedies which reduce the toxicity, mobility or volume of hazardous
substances.

Because this remedy will result in hazardous substances remaining on-site, a review will be conducted to ensure that
the remedy continues to provide adequate protection of human health and the  environment within 5 years after the
commencement of this remedial action.
William' E. Muno, Director^                                             Date
Superfund Division
U. S. Environmental Protection Agency
           Li-j >j_ V	-•   f  ~ ~L*^\	                	f I	"
George Meye^/Secretary       //                                      Daje
Wisconsin Department of Natural Resources
                                                  -  2  -

-------
                                RECORD OF DECISION DECLARATION
                                  GROUND WATER OPERABLE UNIT
                                     FINAL REMEDIAL ACTION

                                            Better Brite Site
                                              DePere, WI
Site Name and Location
The Better Brite Chrome and Zinc Shops are located about 2,000 feet apart at 519 Lande Street and 315 South Sixth
Street, respectively, in De Pere, Wisconsin. The Chrome Shop property comprises 3.7 acres and the Zinc Shop
property comprises 0.61 acre. Both sites are situated approximately % mile west of the Fox River, and are in
primarily residential areas, with some light industrial land uses.

Statement of Basis and Purpose

This decision document represents the selected final remedial action for the Better Brite site.  This action was
developed pursuant to the Comprehensive  Environmental Response, Compensation, and Liability Act of 1980
(CERCLA), as amended by the Superfund Amendments and Reauthorization Act of 1986 (SARA), and the National
Contingency Plan (NCP). This decision is based on the administrative record for the site.

Assessment of the Site

Actual or threatened releases of hazardous substances from the site, if not addressed by implementing the remedial
action selected in this Record of Decision,  may present an imminent and substantial danger to public health,
welfare, or the environment.

Description of the Remedy

The selected remedy for the groundwater, Alternative F, includes:

        • Moving the existing groundwater pretreatment equipment from the Chrome Shop to the Zinc Shop and
        constructing a new building to house it;

        • Continued removal, treatment and discharge to the sanitary sewer of contaminated groundwater from an
        existing groundwater collection sump at the Zinc Shop;

        • Conducting in-situ stabilization and/or solidification treatment of the chromium contaminated soils and
        groundwater at the Chrome Shop;

        • Continued groundwater monitoring; and

        • Implementation of proper institutional controls and site access restrictions.

The selected remedy for the basement/foundation drain exposure, Alternative BE, includes:

        • Sealing the interior access points of existing foundation drains;

        • Waterproofing existing exterior foundation walls;
                                                -  1  -

-------
        • Construction of new exterior building foundation drains with collected water treated at the Zinc Shop
        pretreatment facility;

        • Necessary predesign investigations of the structural integrity of the existing buildings near the zinc shop
        to determine if the above actions are feasible. If it is found that the buildings do not have the structural
        integrity to construct the actions, the actions will be modified to remove as much risk as possible without
        endangering building structural integrity;

        • Continued groundwater monitoring; and

        • Removal and proper treatment/disposal of any contaminated soil that pose health risks or could cause
        additional groundwater contamination near the Zinc Shop after a predesign soil investigation.

Statutory Determinations

This final remedy is protective of human health and the environment, complies with Federal and State requirements
that are legally applicable or relevant and appropriate to the remedial action, and is cost effective. This remedy
satisfies the statutory preference for remedies which reduce the toxicity, mobility or volume of hazardous
substances.

Because this remedy will result in hazardous substances remaining on-site, a review will be conducted to ensure that
the remedy continues to provide adequate protection of human health and the  environment within 5 years after the
commencement of this remedial action.
William E. Muno, Director^                                            Date
Superfund Division
U. S. Environmental Protection Agency
George Meyef/Secretary      ^                                 '    Daje
Wisconsin Department of Natural Resources
                                                 -  2  -

-------
                               RECORD OF DECISION SUMMARY
                                  FINAL REMEDIAL ACTION
                                        Better Brite Site
                                         DePere, WI

                                       Table of Contents

I.      SITE DESCRIPTION, HISTORY AND ENFORCEMENT ACTIVITIES ........................  2
       A. Chrome Shop [[[  2
       B. Zinc Shop [[[  5

II.     COMMUNITY PARTICIPATION  ........................................ ...............  7

III.    SCOPE AND ROLE OF THE RESPONSE ACTION ..........................................  8

IV.    SUMMARY OF SITE CHARACTERISTICS ..............................................  8
       A. Nature and Extent of Wastes [[[  9
       B. Hydrogeologic Conditions [[[  10
       C. Contaminant Summary [[[  12

V.     SUMMARY OF SITE RISKS [[[  18
       A. Qualitative Risk Characterization  [[[  18
       B. Public Health Consultation [[[  19
       C. Rationale for Further Action  [[[  19

VI.    Description of the Remedial Alternatives .................................................  19
       A.     Remedial Action Objectives  [[[  19
       B.     Development of Alternatives [[[ 20
       C.     Description of Alternatives  [[[ 20

VII.    SUMMARY OF COMPARATIVE ANALYSIS OF ALTERNATIVES ......................... 28
       A.     Introduction [[[ 28
       B.     Evaluation of the Remedial Alternatives ........................................... 29

VIII.   THE SELECTED REMEDY

-------
Administrative Record Index
                                                 -  2  -

-------
                                   RECORD OF DECISION SUMMARY

                                             Better Brite Site
                                               DePere, WI

 I.       SITE DESCRIPTION, HISTORY AND ENFORCEMENT ACTIVITIES

 A. Chrome Shop

 1. Site Description

 The former Better Brite Chrome Shop is located at 519 Lande Street within the City of De Pere, Brown County,
 Wisconsin and occupies approximately 3.7 acres (Figure 1).  The site is bordered to the north by Lande Street, to the
 east by a railway, and to the south and west by residences. The Chrome Shop lies within a residential area; the
 nearest homes are about 100 feet from the former facility property boundary.  The Chrome Shop is located
 approximately V* mile west of the Fox River, which flows northeast to Green Bay.

 2. Site History

 Better Brite began its chrome plating division in the mid 1970's at 519 Lande Street, De Pere, Wisconsin.  The
 Chrome Shop primarily engaged in chrome plating 15 to 20 foot rollers for paper mills in the area.  Vertical in-
 ground dip tanks were used to plate the paper rollers.

 Based on aerial photographs, a private residence, two large buildings (apparently an elevator and a storage
 building) and a smaller building (possibly a utility building) were present on the northern portion of the property in
 1963.  The southern half of the property was open field. In a September 1972 aerial photograph, the southern half
 of the property had been cleared, possibly in preparation for construction of the building which would house the
 Chrome Shop. The Site property was deeded to Better Brite in early 1973. A September 1973 aerial photo shows
 the production building for Better Brite is under construction.

 By 1978  the chrome plating operations had begun at the site. The first reported spill documented in WDNR
 records, estimated at 2,200 gallons, occurred in February 1979. As a result of this spill, a subsurface loading dock
 on the northwest corner of the building was filled with 2 to 3 feet of frozen yellow water. The WDNR ordered the
 frozen rinse water be moved inside the facility to be thawed before discharging the melted water to the sanitary
 sewer. The company was also ordered to remove the contaminated soils located below the frozen water. WDNR
 records indicate contaminated soils were not removed, and fresh sandy soil was brought to the site and the loading
 dock filled in to grade without WDNR approval. Better Brite was subsequently ordered to install a groundwater
 collection and pretreatment system.

 Initially, it was thought that most of the contamination at the site resulted from spillage above grade. Therefore, in
 August 1979, the WDNR ordered the installation of shallow groundwater monitoring wells, a collection trench
 system, often referred to as the "French Drain" and a surface-water holding pond to intercept any contaminated
groundwater and surface water resulting from these spills. This work was performed by Better Brite. In addition,
contaminated soils from neighboring properties were removed and stockpiled on the Chrome Shop property.

Better Brite filed for bankruptcy in October 1985. Plating operations were also discontinued at the site at this time.
During the bankruptcy proceedings, the WDNR discovered that the vertical tanks located under the building had
been leaking. By 1985 it was estimated that between 20,000 and 60,000 gallons of chrome plating solution leaked
from the tanks during  the time the plant was in operation.
                                                -  3  -

-------
 3.  Corrective Measures

 Several corrective measures have been implemented since 1979 to remove hazardous materials, contaminated soil,
 and groundwater. The purpose of these removal activities was to reduce the threat of public exposure to
 contaminants. The following sections provide a summary of the corrective measures conducted at the Chrome
 Shop.

 3.1 Removal Activities

 In 1980, contaminated soil from a neighboring property west of the facility was excavated and deposited on the
 Chrome Shop property.  The contaminated soil was disposed of in a licensed landfill as part of the United States
 Environmental Protection Agency (U.S. EPA) removal activities in 1986.

 In April 1986, the U.S. EPA's Technical Assistance Team (TAT) removed four subsurface plating and cleaning
 tanks from inside the building.  Better Brite had previously attempted to remove the tanks and only removed
 portions of them. Three of the tanks contained approximately 1-1/2 feet of liquid material.  Tank #1 had contained
 a degreaser. Waste plating solutions were stored in tanks #2 and #3. The fourth tank, which had stored muriatic
 acid (hydrochloric acid), contained about 14 feet of liquid.

 The U.S. EPA Emergency Enforcement and Response Branch (EERB) then conducted the Phase I removal activities
 at the Chrome Shop from September 1986 until April 1987.  Activities included the removal of all on-site hazardous
 materials contained in drums, tanks, and vats,  the installation of a site "monitoring well," the removal of visibly
 stained soils from the south and southwest sides of the building, and removal of wastes from the facility plating pits.
 The "monitoring well" consisted of a 6-inch diameter pipe placed in the void created by removal of the vertical in-
 ground tanks.  Visibly contaminated soils were excavated around the plating pits and all tanks, vats, and drums were
 removed and scrapped. In total, the U.S. EPA EERB removed approximately 83 tons of contaminated soil, 9,270
 gallons of chromic acid, 3,600 gallons of base/neutral liquids, 550 gallons of cyanide solution, 150 pounds of
 cyanide sludge, and 500 gallons of flammable liquids.

 In the summer of 1989, the Chrome Shop building and contents were sold by the owner of the building, Mr. John
 Zenner. The City of De Pere and WDNR stipulated to the buyer that the area beneath the building had to be capped
 and the surface water holding pond closed off by filling with soil. The Chrome Shop facility building was removed
 and the former building area was capped with  clay by the WDNR and the buyer. The area was fenced by the
 WDNR to prevent public access to possible contaminated soils.

 In 1993, the U.S. EPA TAT excavated impacted  soil from the area located  adjacent to the southwest corner of the
 former location of the Chrome Shop building (Phase II removal). The approximate limits of this excavation are
 depicted by the sump boundary on Figure 2. Soil was excavated to a depth of approximately 20 feet below ground
 surface (bgs).  Soil samples collected from the bottom of the excavation confirmed that the soil left in place was not
 impacted with metals.

 During Phase II removal activities, the portion of the concrete foundation of the Chrome Shop that remained in
 place after previous removal activities was removed and taken off-site for proper disposal. Impacted sand fill
 beneath the foundation was also excavated and taken off-site for proper disposal.

The U.S. EPA TAT also removed impacted surface soil from around the Chrome Shop and on properties adjacent to
the site. Surface soil was excavated to depths of approximately 1.0 to 1.5 feet bgs. Analytical data for surface (0 to
0.5 feet bgs) and subsurface (2.5 to 3.0 feet bgs) soil samples collected from across the Chrome Shop and adjacent
properties were used to define the extent of surface soil impacts and direct the excavation activities. At the
completion of excavation activities, clean soil was placed over the area from which the impacted surface soil was


                                                -  4  -

-------
 removed.

 A total of approximately 4,236 tons of chromium contaminated soil, concrete, and debris classified as characteristic
 D007 hazardous waste were removed from the Chrome Shop during the Phase II removal activities.  In addition,
 approximately 6,103 tons of chromium contaminated special waste soil, concrete, and debris were removed from the
 Chrome Shop.

 3.2  Water Treatment

 In 1979 and 1980, Better Brite installed ten shallow groundwater monitoring wells, a groundwater collection
 system, and a surface water control system. The groundwater collection system consisted of a collection trench on
 the southern and western edge of the southwestern corner of the property (groundwater flow was determined to be
 to the west), and a 500-gallon sump for temporary storage of the contaminated groundwater. The surface water
 control system consisted of a retention berm on the south and western sides of the trench alignment that directed
 water to a surface water holding pond located in the northwest corner of the Chrome Shop property.  Surface water
 could be pumped from the surface water holding pond to the sanitary or storm sewer depending on the
 concentration of chromium in the water.

 The collection trench installed by Better Brite along the southern and western edges of their property had not been
 pumped since approximately 1986. Groundwater levels had risen during the spring thaw event in 1988, which
 caused flooding in the low areas between the residences and the Chrome Shop. Chromium-contaminated surface
 water was collecting in the adjacent neighbors' backyards, causing chromium to deposit in soils and gardens on their
 properties. Therefore, in March 1988, the U.S. EPA EERB authorized pumping of the water from the previously
 installed collection trench system into the City of De Pere sanitary sewer as an interim measure to eliminate
 ponding.

 In an effort to eliminate the threat of groundwater contamination and continued off-site movement of contaminants
 at the Chrome Shop, the U.S. EPA EERB installed an on-site water pretreatment system in September, 1990. The
 system included a recovery well, a 5,500-gallon holding tank, a 5,000-gallon reaction vessel (tank) and a protective
 building to house the equipment.  The recovery well was the "monitoring well" installed within the void created by
 the removal of the vertical in-ground tanks in  1986.

 Groundwater was pumped via the recovery well and collection trench (French Drain) to the holding tank for
 temporary storage. Groundwater is then transferred to the reaction tank in batches where the pH is initially lowered
 to approximately 2.5 by adding sulfuric acid.  Reduction of hexavalent chrome to trivalent chrome is  facilitated by
 adding sodium bisulfite (NaHSO3), which is followed by addition of sodium hydroxide to raise pH to approximately
 8.5 and precipitate chromium hydroxide. A polymer is added at this point in the treatment process to settle the
 precipitate. The treated water is decanted off and discharged to the sanitary sewer. The precipitate (sludge) is sent
through a filter press. Water produced by the filter press dewatering process is returned to the head of the treatment
 system. The dewatered sludge is placed in  drums and has been determined by laboratory analysis to be hazardous
waste.

The system was designed in cooperation with the City of De Pere and is capable of pre-treating approximately 2,000
gallons of chromium-contaminated water per day for discharge into the De Pere sanitary sewer. Contaminants
(chromium hydroxide sludge predominantly) removed from the water were initially transported to the Zinc Shop
building for temporary storage and then to a metal recovery facility. Currently, Chemical Waste Management is
contracted by WDNR to transport the sludge to its Menomonee Falls, Wisconsin facility for appropriate disposal.

After completing the Phase II removal activities, the U.S. EPA TAT replaced the existing recovery well and french
drain with a groundwater collection system in  1993. The groundwater collection system was constructed in the pit


                                                -  5  -

-------
 created by the excavation of impacted soil located adjacent to the southwest comer of the former location of the
 Chrome Shop building.

 An impermeable membrane was placed on the bottom of the pit and 6-inch diameter perforated pipe was then
 installed on top of the impermeable membrane. Pea gravel was placed around the perforated pipe and a filter fabric
 was then placed on top of the pea gravel. The excavation was then filled with 3/4-inch diameter washed limestone
 gravel to approximately 6 feet bgs.  Filter fabric was then placed on top of the limestone gravel and a clean clay cap
 was placed above the filter fabric to ground level. The perforated pipe was connected to a large diameter perforated
 standpipe (sump) from which the groundwater that collects in the collection system can be extracted. A submersible
 pump attached to a float is used to pump the groundwater that collects in the groundwater collection system. The
 groundwater pumped from the groundwater collection system is piped to the on-site pre-treatment plant for removal
 of chromium before being discharged to the City of De Pere sanitary sewer. Construction of the groundwater
 collection system is described in Appendix C of the Remedial Investigation report (RI) for the site.

 B.  Zinc Shop

 1. Site Description

 The Zinc Shop is located at 315 South Sixth  Street in the City of De Pere, Wisconsin (Figure 1). The parcel of land
 occupied by the Zinc Shop covers approximately 0.61 acre. There are private residences immediately to the  north
 and south of the property and a car detailing  facility, leased by a farmers' cooperative, to the east. Across Sixth
 Street, to the west, are private residences. The municipal well closest to the site is located slightly beyond the homes
 to the west, approximately 250  feet from the site. The Fox River is approximately 1/4 mile to the north and  east of
 the Zinc Shop. An elementary school, a high school, and a small private college are all located within 1/8 mile of
 the site.

 2. Site History

 Better Brite began operations at the 315 South Sixth Street facility in the late 1960s.  When the business opened,
 vertical in-ground dip tanks were used for chromium plating operations.

 A 1925 Sanborn map shows the Albers and Rupiper Lumber and Millwork facility at the present day Zinc Shop site.
 At this time, a bulk station of the Winona Oil Company was located to the southeast of the lumber and millwork
 facility. The 1951 Sanborn maps indicate that a bulk oil station owned by Standard Oil Company was located to the
 east of the Zinc Shop site. The  gas tanks from the Winona Oil Company were still present to the southeast, but in
 1951 they were labeled as belonging to the Progressive Farmers Oil Company.  On the 1953 Sanborn map oil tanks
 are  listed to the northeast but not shown.

 In February, 1967 Better Brite purchased, by land contract, the Sixth Street property from Leland Rupiper. At this
time, the lumber yard at 315 South Sixth Street was converted into a chromium plating operation by Better Brite. In
March of 1973 the land contract was satisfied and the deed to the property transferred to Better Brite. Better Brite
opened an additional chromium plating facility in the mid 1970's at 519 Lande Street, and in the late 1970's,  the
main function of the Sixth Street facility shifted from chromium to zinc plating.  The Sixth Street facility is now
referred to as the Better Brite Zinc Shop (ID# 006132088) and the Lande Street facility as the Better Brite Chrome
Shop (ID# 560010118).

Through the 1970's poor operational practices allowed plating solutions and rinse water to flow from the building
between the floor and sill plate along the south and east sides of the building. On February  13, 1980, in response to
a complaint from a neighbor, the first samples of ponded water were collected by the WDNR and analyses of the
soils established the presence of contamination at the site. These samples were collected near the south edge of the


                                                 -  6  -

-------
 Zinc Shop building along the property line. Laboratory analysis confirmed that the water contained between 8.1
 and 56 parts per million (ppm) zinc, between less than 0.1 and 0.6 ppm chromium, and between 0.1 and 0.6 ppm
 cyanide.

 On April 21, 1983, a neighbor complained about spillage of wastewater from the Zinc Shop. WDNR investigated
 and observed that a hose, extending from a pump in a below grade loading dock to a sanitary sewer, was leaking
 and forming a puddle. The puddle ultimately flowed to a storm sewer about 150 feet away. Analyses of the water
 samples collected by the WDNR revealed a concentration of 8.4 ppm dissolved zinc in the puddle; 4.9 ppm
 dissolved zinc and 25 ppm cyanide at the loading area;  and 5.6 ppm total zinc at the inlet to the storm sewer.
 Analysis for chromium content was not completed.

 On May 30, 1983, an inspection of the facility was conducted by personnel from the Air Management Section of
 WDNR. They observed rinse waters from within the building mixing with spilled chemicals around drums and
 running out the door, as well as dead vegetation between the sidewalk and South Sixth Street.  Two composite
 surface soil samples were collected and analyses of the  soils revealed that the samples contained between 270 and
 380 mg/kg cyanide, 2,800 and 2,600 mg/kg sodium, 1,500 and 2,600 mg/kg zinc, 100 and 170 mg/kg chromium
 and 28 and 38 mg/kg cadmium. Based on this information, it appears sodium cyanide and a mixture of plating
 solution was spilled out the door of the facility.

 On or about September 5, 1985, Better Brite filed a voluntary petition for corporate reorganization under Ch. 11 of
 the Bankruptcy Code.  Between September 16, 1985 and August 27, 1986, John Zenner operated the Zinc Shop as
 examiner/trustee.  During this time, Better Brite installed and operated an industrial wastewater treatment facility.
 Operation of this system commenced on or about May 11, 1986, and continued until approximately July 14, 1986.
 During this time, drums of sludge waste were generated. The actual effectiveness of this system is unknown.

 On September 27, 1985, a sampling program was conducted by the WDNR around the Zinc Shop facility.  Six soil
 samples were collected at locations where liquids were observed leaking from the building and areas with stressed
 or no vegetation. Three samples were collected along the southern property line from 0 to 6 inches in depth. The
 fourth  sample was collected  immediately adjacent to the Zinc Shop building from 0 to 6 inches in depth from about
 the middle of the building along its east side.  The fifth and sixth samples were collected along the middle of the
 east wall of the building from depths of 0 to 6 inches and 6 to 12 inches. Analysis of these samples revealed that the
 soils contained between 410 and 13,000 mg/kg zinc, 6.9 and 64 mg/kg cyanide, 55 and 1,100 mg/kg chromium, 18
 and 460 mg/kg lead, and 1 to 43 mg/kg cadmium.

 The U.S. EPA air photo review indicated that the building seen along the northern site boundary had been removed
 by the time the June, 1986 photograph had been taken.  On June 27, 1986, the WDNR collected two water samples
 from the sump in the basement of the 401 South Sixth Street residence, located immediately south of the Zinc Shop.
 The samples contained chromium concentrations of 1.1  and 5.8 mg/L

 On August 8, 1986, the WDNR documented a "toxic and hazardous materials incident" at the Zinc Shop facility in
 which the treatment tank overflowed and approximately 15 gallons of liquid flowed into Sixth Street. The incident
 was addressed by the facility personnel and the  liquid was cleaned up.

 In December 1986, John Zenner officially purchased the Zinc building and its equipment (with exception of the
hazardous waste accumulated at the site). He leased the property underlying the building and incorporated under
the name, The Zinc Shop, TJIC.  Operations at The Zinc Shop, Inc. continued until July 1989.

 Since 1980, there have been  ongoing investigations and litigation between the State of Wisconsin and The Zinc
 Shop, Inc.; Platers, Inc.; Better Brite Plating, Inc.; David Matyas (Bankruptcy Trustee for Better Brite); and John
Zenner (Bankruptcy Examiner for Better Brite Plating, Inc. and owner of Platers Inc. and The Zinc Shop, Inc.) in


                                                -  7  -

-------
 regard to spills, hazardous waste and wastewater violations.

 3. Corrective Measures

 During the initial investigations, several corrective measures were implemented to remove and/or contain heavy
 metal and VOC contaminants at the Zinc Shop property.  Plating operations at the Zinc Shop were discontinued in
 1989, ending the generation of additional hazardous material at the site.

 The disposal of hazardous material at the Zinc Shop was completed by the U.S. EPA EERB in early 1990. The
 disposal included hazardous material stored or abandoned on-site including plating solutions and sludge stored in
 drums, vats, and tanks. Some of this material had been stored on site in excess of the legal holding time (Wisconsin
 Administrative Code Chapter NR 600).

 The U.S. EPA EERB constructed a groundwater collection sump along the east side of the Zinc Shop building. The
 sump began operation in August of 1990. Between August of 1990 and March of 1991, approximately 40,000
 gallons of contaminated groundwater had been pumped from the underlying aquifer. Between February 1991, and
 September 1991, approximately 33,000 gallons were transferred from the Zinc Shop to the Chrome Shop for
 pretreatment in the U.S. EPA constructed pretreatment facility. Extracted groundwater was transported via a tanker
 truck to the water pre-treatment facility constructed at the Chrome Shop for treatment prior to discharge to the De
 Pere sanitary sewer.

 In March of 1991, the floor of the Zinc Shop building and the carousel plating machinery were decontaminated by
 U.S. EPA contractors using a steam cleaner.  Two floor sumps were also cleaned. Once the building had been
 decontaminated a sealant was applied to the building floor to limit the potential for exposure.

 A fire destroyed the Zinc shop in September of 1992.  Because all hazardous substances had been removed from the
 building during initial removal activities, the fire did not result in the release of any hazardous substances to the
 environment. After the fire, the ERGS, the TAT and the subcontractor crew began dismantling the remains and
 removing the foundation.  The foundation was finally removed in November 1992.  In addition, the two 15-foot
 long vertical in-ground dip tanks found beneath the foundation  of the Zinc Shop were removed, emptied, and
 disposed of as scrap.

 After the foundation was removed, the crew began excavating the soils in the area of the former foundation. The
 purpose of this excavation was to remove the soils with the highest contaminant concentrations. The final
 excavation had a total depth of approximately 20 feet and encompassed the area of the former foundation. The
 approximate limits of the excavation are shown as the boundary of the groundwater collection system completed in
 1993 on Figure 3.

 The soil excavated from beneath the former location of the Zinc Shop was segregated into characteristic (D007)
 hazardous waste and special waste soil piles and taken off-site for proper disposal. Approximately 2,752 tons of
 D007 chromium contaminated soil, concrete, and building debris and 3,280 tons of chromium contaminated special
 waste soil, concrete, and building debris were removed from the site. Soil samples were collected from the bottom
 of the pit and submitted for laboratory analyses.  The analytical results indicated that no soils were present above
 allowable concentrations at the bottom of the pit. Excavation activities were completed in January 1993.

 The U.S. EPA installed a groundwater extraction sump in the former excavation to facilitate recovery of
contaminated groundwater. This system replaced the smaller groundwater collection system constructed at the site
during the initial phase of removal activities. Upon completion of excavation activities, a 40-mil liner was spread
 over the pit bottom.  Six-inch diameter perforated pipe and two vertical clean out pipes were installed in trenches at
the base of the excavation. The trenches were backfilled with pea gravel and covered with filter fabric.  The pit was


                                                 -  8  -

-------
 then backfilled with 3/4-inch washed limestone.  The collection pipe for the groundwater collection system is a
 large vertical standpipe which was placed at the low point of the excavation. The standpipe was wrapped with filter
 fabric and surrounded with 1 '/2-inch gravel.  Groundwater is pumped out of the sump using a vacuum tank truck.
 The impacted water is then taken to the existing Chrome Shop pretreatment plant for removal of chromium impacts
 before being discharged to the City of De Pere sanitary sewer.

 Two monitoring wells (MW-4 and MW-4 A) were installed on a residential property to the west of the Zinc Shop in
 February  1993 as part of Phase II removal activities (Figure 3). The monitoring wells are located on the west side
 of South Sixth Street, directly across the street from the Zinc Shop.  One well was completed as a water table
 monitoring well  and the second well was completed as a piezometer screened near the top of the bedrock surface.
 Both wells were  constructed of 4-inch inside diameter (ID) poly vinyl chloride (PVC) well materials and were
 intended for possible use as groundwater extraction wells if impacted groundwater was detected at this location.  As
 a protective measure, the Grant Street municipal well has also been sampled semi-annually instead of the usual
 annual frequency. The frequency of the well sampling was increased to allow for detection in the event
 contamination should enter the well head from the site. To date no elevated levels of contaminants of concern have
 been detected in  this well.  Sampling for chromium, zinc, and cyanide  is currently performed in addition to  standard
 sampling (bacteria, etc.). VOC samples are collected and analyzed periodically.

 II.     COMMUNITY PARTICIPATION

 A Community Relations Plan for the site was finalized in 1991. This document lists contacts and interested parties
 throughout the local and government community. It also establishes communication pathways to ensure timely
 dissemination of pertinent information. An information repository has been established at the Brown County
 Library, DePere  Branch. The administrative record is available to the public at the Department's Madison and
 Northeast Regional offices in Green Bay.

 The 7/22/91 Community Relations Plan for the Better Brite site was prepared to outline the methods to be used to
 solicit and use public participation in the Superfund process for the site.  It included the initial mailing list to be used
 for the site. In May, 1991, the Wisconsin Division of Health (DOH) published and sent out for comment a
 preliminary Health Assessment. This health assessment included a review of available contaminant data and
 interview results  from residents in the area, and made recommendations for future study and action to better define
 and reduce risk from exposure to contamination from the site, through  surface water, soils and groundwater. On
 May,  1991, a public meeting was held to discuss the upcoming removal actions, designed to reduce risk of exposure
 to chromium contaminated soil.  This meeting was well attended.  On May 22, 1991, a proposed plan was published
 outlining the interim action/removal action to address site contaminated soils.

 In September, 1992, EPA prepared and sent an update on site activities to those on the mailing list. This letter
 briefly described the interim action and ongoing removal activities.

 In February, 1993, the DOH published a health information fact sheet regarding the soil removal activities at the
 site, and the subsequent impact to risk of resident exposure, and was made available to those people attending the
 public meeting held on February 16, 1993. The purpose of this meeting was to provide an update on the ongoing
 soil removal activities and to discuss future cleanup plans. EPA prepared and sent a factsheet announcing this
public meeting in February, 1993. Thirty seven people attended this public meeting.

A public meeting was held on June 27,  1994, to provide another update on removal activities and the ongoing
remedial investigation. A factsheet was prepared and mailed to those on the mailing list in June 1994, announcing
the public meeting. The DOH also prepared an update on health information for this public meeting.

The Proposed Plan for the site was made available for public comment on July 26, 1996.  A public meeting to


                                                 -  9  -

-------
 explain the Proposed Plan, and to receive public comments was held on August 8, 1996. All comments which were
 received by the Department prior to the end of the public comment period, including those expressed verbally at the
 public meeting, were considered in making the final decision and are addressed in the Responsiveness Summary,
 which is attached to this decision document.

 The Proposed Plan described Alternative BE, Basement Isolation with External Control, to include the construction
 of new internal walls and floors in the buildings.  Based on the comments received during the public comment
 period, it was determined that new internal walls and floors would not be feasible due to concerns about access to
 monitor the walls and the past history of basement flooding in the buildings.

 The public participation requirements of s. 144.442(6)(f), Wisconsin Statutes, and the community relations
 requirements in the National Contingency  Plan under 40 CFR s. 300.430(f)(3) have been met in this remedy
 selection process. All the documents listed above are available in the Administrative Record maintained at the
 Department's Madison and Northeast Regional offices.

 HI.      SCOPE AND ROLE OF THE RESPONSE ACTION

 Contaminated groundwater and soil at the  site are the affected media that pose a threat to human health and the
 environment because of the current and future risks identified.  Contaminated groundwater at the site poses a
 possible future threat to human health and  the environment because of the risks from possible ingestion of or dermal
 contact with the groundwater should a well be installed at the site or should the contaminated groundwater reach the
 bedrock aquifer, which is used as a regional drinking water source.

 The selected groundwater remedial action, described as alternative F, addresses the threats posed by the site
 conditions by containing and/or controlling the groundwater contamination at the site and reducing the levels of
 contamination in the groundwater. The selected groundwater action also actively restores the groundwater at the
 Chrome Shop. The selected basement/foundation drain action, described as alternative BE, addresses the threats
 posed by site conditions by eliminating the potential for direct contact with contaminants of concern in the
 groundwater and the existing basements.

 IV.     SUMMARY OF SITE CHARACTERISTICS

 A. Nature and Extent of Wastes

 1.  Chrome Shop

 Better Brite began plating activities at the Chrome Shop  facility at 519 Lande Street in the mid 1970s. In 1973, the
 519 Lande Street property (residence) was  purchased by M. J. Hintz with the remainder of the property purchased
 by Better Brite Plating, Inc.  The facility primarily engaged in chrome plating of 15 to 20 foot rollers for paper mills
 in the area. The site contained four vertical underground storage tanks (USTs) which were believed to contain
muriatic acid (hydrochloric acid; one tank), degreaser believed to be composed of chlorinated organic solvents (one
tank), and chrome plating solution (two tanks).  The rollers were reportedly plated in the vertical USTs which
 extended 18 to 20 feet below grade.

Chromic acid (H2Cr04) utilized at the Better Brite plating facility contained chromium which was predominantly in
the hexavalent form.  During the electroplating process, extremely low pHs are produced in the plating solution. At
these pHs and chromium concentrations, the main hexavalent forms of chromium are the dichromate ion (Cr207'2)
and undissociated chromic acid. These substances, commonly used to plate metal products, are powerful oxidizing
agents.
                                                -  10  -

-------
 The WDNR documented numerous Resource Conservation and Recovery Act (RCRA) violations and spills at the
 Chrome Shop since December 1978. The first reported spill, estimated to have been 2,200 gallons of chromic acid,
 occurred in February 1979 at a subsurface loading dock. Numerous allegations by neighboring residents cited
 frequent dumping outside the loading dock doors. Site inspections conducted by WDNR also document the
 presence of contaminated soil and ponded surface water in the vicinity of the loading dock.

 According to WDNR records, Better Brite released cyanide waste and zinc sludge on the Chrome Shop property
 during the winter of 1978/1979.  In a letter dated August 7, 1979, a former Better Brite employee explained that
 three 55-gallon drums of cyanide waste and zinc sludge were dumped behind the Chrome Shop building. This
 event was reported anonymously to the WDNR shortly following the release.

 In a signed statement by another Better Brite employee, approximately eight or nine 55-gallon drums of chromic
 acid were stored in an old grain elevator on the property during the summer of 1981. At least one of the drums
 allegedly had split along a seam and spilled the contents of chromic acid.  The contaminated soil was allegedly
 covered with clean material. The employee also stated in the months following the alleged spill he noticed yellow
 surface water ponding in the area.  The statement also discussed a separate spill event that allegedly occurred on the
 same day the employee noted the ruptured 55-gallon drum of chromic acid. The employee stated that a plating bath
 of chromic acid was spilled on the property, but no further documentation of a spill during the summer of 1981 is in
 the WDNR files.

 In 1985 it was determined that the vertical plating USTs inside the building had been leaking.  It was estimated that
 between 20,000 and 60,000 gallons of chrome plating solution had been released due to the  leaking USTs during the
 Chrome Shop's seven years of operation.

 On August 4, 1986, the Chrome Shop was reportedly vandalized which resulted in a spill of rinse water or plating
 solution. Approximately 300 gallons of rinse water or plating solution was spilled into one of the holes created by
 removing the vertical USTs and the sanitary sewer.

 2. Zinc Shop

 In the late 1960s, Better Brite began its electroplating operation at the Zinc Shop location in De Pere.  Originally,
 the facility conducted electroplating with chrome, then in 1978, the focus of the operation shifted to primarily zinc
 plating. The items which were plated at the facility included large 15 to 20 foot rollers for the paper industry as
 well as a variety of smaller items.

 Since 1980, when the investigation of suspected contamination at the site was initiated, WDNR has documented
 numerous RCRA violations. On August 8, 1986, 15 gallons of liquid were released from a treatment tank . Specific
 information pertaining to the types and amounts of the numerous other alleged releases which  have occurred at the
 site are absent from the WDNR file, primarily, it is expected, because most of the releases were never reported by
 Better Brite (leakage along sill plate, etc.).

 Due to the nature of the operation and the products used at the site, the main contaminants at the site are likely to
 include heavy metals, solvents and acids.  The metals consist of primarily zinc and chromium used for plating as
well as lead and cadmium which are contained in the electrodes required in the plating process. The solvents used
at electroplating facilities typically contain VOCs. Except for a reference to a drum of methyl  ethyl ketone (MEK)
in 1986, no use or presence of solvents has been documented at the Zinc Shop. However, VOCs have been detected
in groundwater at the site. In addition, cyanide is a contaminant of concern, as sodium cyanide solution was used
along with the acids in the zinc plating process.

Specific information pertaining to the various chemical compounds used at the site are known from inventories


                                                -  11  -

-------
 completed by U.S. EPA. In October of 1986, during an inventory of the facility, representatives of U.S. EPA noted
 approximately 40 drums containing solid plating sludge, sodium hypochlorite, or unknown solids, six vats
 containing cyanide solutions with varied compositions, acids or other caustic materials, and five tanks with acid,
 cyanide, or treated effluent.

 B. Hydrogeologic Conditions

 The groundwater flow regime beneath both sites consists of three distinct water bearing units.  These units include
 the following:

         +      The saturated thickness of the unconsolidated glacial lacustrine and till deposits,

         +      Dolomite of the Sinnipee Group consisting of Ordovician-age dolomite, and

         4      Underlying aquifers consisting of Ordovician and Cambrian-age sandstones.

 The glacial deposits are of low productivity and are not utilized for domestic water supply. The dolomite bedrock is
 not commonly used for water production in the area, although some private wells utilize this aquifer. Based on data
 gathered during the drilling of the bedrock piezometers, the upper 10 to 15 feet of the dolomite bedrock is capable
 of producing adequate volumes of water for residential water supplies in localized areas. During bedrock drilling at
 the Zinc Shop, water-bearing  dolomite was intersected within 15 feet of the top of the bedrock while at the Chrome
 Shop no water was produced from the dolomite during drilling.  The sandstone aquifer is the main aquifer for this
 region and is noted for its high productivity for water supply purposes. The top of the sandstone is estimated at  170
 feet bgs based on the well log for the Grant Street Municipal Well.

 1. Flow Directions and Gradients

 The wells at the Chrome Shop and Zinc Shop can be generally grouped into three categories: water table monitoring
 wells, shallow piezometers, and bedrock piezometers.  The water table wells range in depth between 15 and 17 feet
 bgs. The configuration of the water table and the direction of groundwater flow in the upper portion of the
 unconsolidated deposits at the Chrome Shop as measured on October 17, 1994 and May 2 and 3, 1995 are shown on
 Figures 4 and 5, respectively.  The water table configuration and direction of groundwater flow at the Zinc Shop on
 November 15, 1994 and May  2 and 3, 1995 are shown on Figures 6 and 7, respectively. The water table maps show
 that the directions of groundwater flow across both sites are affected by the groundwater collection systems
 indicating that groundwater near the water table at both former shop locations is captured by the extraction systems.
 The general direction of shallow groundwater flow beyond the control of the groundwater collection systems is to
 the west at both sites.

 Horizontal groundwater gradients vary considerably across both sites. As the groundwater contours show, gradients
 are highest near the groundwater collection systems and decrease away from systems. Gradients near the Chrome
 Shop groundwater collection system as calculated are between 0.3 ft/ft and 0.6 ft/ft using the October 17, 1994 and
 May 2-3,  1995 water level data.  Gradients north and south of the Chrome Shop  groundwater collection system
range between 0.03 ft/ft and 0.05 ft/ft west for both the October 17, 1994 and the  May 2 - 3, 1995 water level data.
At the Zinc Shop, gradients in the vicinity of the groundwater collection system were calculated to be between 0.07
 ft/ft and 0.3 ft/ft for the November 15, 1994 water level data, and between 0.04 and 0.2 ft/ft for the May 2 - 3, 1995
water level data.  Gradients north and south of the Zinc Shop groundwater collection system were calculated
between 0.01 ft/ft and 0.03 ft/ft west using the November 15, 1994 data. Seasonal variations in  gradients are
probable.

At the Chrome Shop, the potentiometric surface slopes gradually to the south at nearly a 90° angle to the bedrock


                                                -  12 -

-------
 surface slope. At the Zinc Shop, the potentiometric surface mimics the bedrock topography with a potentiometric
 high west of the site and flow in an easterly direction across the site. The horizontal gradient across both sites is
 approximately 0.03 ft/ft.

 The shallow piezometers are completed near the base of the unconsolidated deposits, within 2.5 feet of the top of
 the bedrock surface.  The shallow piezometers range in depth from 24 to 40 feet bgs. A comparison between the
 potentiometric surface elevations in the shallow piezometers and the groundwater elevations measured in
 corresponding nested water table monitoring wells indicates that the dominant direction of vertical groundwater
 flow at both sites is downward.  Downward vertical gradients occur at all well nest locations with the exception of
 well nest MW-4/MW-4A at the Zinc Shop.  At the MW-4/MW-4A well nest, the groundwater elevations in MW-4
 and MW-4 A were identical on two of the dates that water level measurements were collected (11/15/94 and
 11/25/94); the vertical gradient was slightly downward on October 17, 1994 and March 20, 1995, and slightly
 upward on September 28, 1994 and May 2-3, 1995. The calculated vertical gradients at the remaining Zinc Shop
 well nests ranged from 0.08 ft/ft to 0.93 ft/ft downward. Based on the water level data gathered during this RI, the
 magnitude of the vertical gradients is between 0.18 ft/ft and 0.56 ft/ft downward at the Chrome Shop.

 Because the hydraulic conductivity of the glacial deposits is low, the water levels measured in the shallow
 piezometers purged for development and sampling may not be representative of static conditions. The water level
 data was collected after all of the monitoring wells installed for the RI were developed, between sampling rounds,
 and after the second sampling round. Approximately one week to one month elapsed between the time the
 monitoring wells were purged and water levels were measured.  The time interval between purging and water level
 measurements may not have been long  enough for the water levels in the piezometers to recover to static conditions.
 Following complete recovery, the direction of vertical groundwater flow (downward) is not expected to change;
 however, the actual magnitude of vertical gradients are likely  less than the calculated vertical gradients.

 The bedrock piezometers are completed approximately 30 feet below the top of the bedrock surface and range in
 depth between 59.5 and 71.1 feet bgs.  The water levels in the bedrock piezometers did not reach   static conditions
 following  development and sampling based on the water level data gathered at both sites for the RI, which was
 completed in 1995. Initial water levels  in some of the bedrock piezometers ranged from 13.48 feet bgs (MW-5B) to
 51.28 feet bgs (MW-107B) prior to development but did not recover significantly after development. Pre-
 development water levels are not considered to be valid because water could have entered the well from  more
 permeable units above the screened interval during construction prior to seal placement, or from water used to
 hydrate the bentonite annular space seal. The initial water level  from existing Chrome Shop bedrock piezometer B-
 101 was at approximately 26.2 feet bgs, which indicates that given enough time the water levels in the bedrock
 piezometers will rise significantly over  what has been measured in the bedrock piezometers as part of the RI.
 Because of the uncertainty of the actual potentiometric surface elevations for the bedrock piezometers, the direction
 of the horizontal component of groundwater flow within the upper bedrock cannot be accurately determined using
 the  existing data. Also, the magnitude of vertical gradients cannot be estimated with great confidence. The water
 level data  and slow recovery rates in the bedrock piezometers indicate that downward vertical gradients likely exist
 between the unconsolidated deposits and the dolomite bedrock.

2. Hydraulic Properties and Flow Velocities

The glacial deposits in the vicinity of the Better Brite sites have very low hydraulic conductivity values ranging
 from 4 x 10-5to  1.2x 10'7 cm/sec. The geometric mean hydraulic conductivity for the Chrome Shop glacial deposits
monitoring wells is 3.8 x 10* cm/sec and 2.8 x 10* cm/sec for the Zinc Shop glacial deposits monitoring  wells.  A
comparison of the hydraulic conductivity values between the water table monitoring wells and shallow piezometers
 shows that there is not a significant difference in the values between the two sets of wells. The average hydraulic
conductivity for the shallow piezometers and the average hydraulic conductivity for the water table monitoring
wells are within approximately an order of magnitude for both sites.


                                                - 13  -

-------
 Hydraulic conductivity test data was calculated for one bedrock piezometer at the Chrome Shop (MW-106B) and
 one bedrock piezometer at the Zinc Shop (MW-4B). No other hydraulic conductivity test data were analyzed for
 the bedrock piezometers due to the very slow rate of water level recovery in the wells. For the dolomite bedrock, a
 hydraulic conductivity of 1.0 x 1Q-8 cm/sec was calculated at MW-106B, and at MW-4B, a hydraulic conductivity of
 3.2 x 10'7 cm/sec was calculated. The hydraulic conductivity measured at MW-4B is an order of magnitude higher
 than at the other bedrock piezometers. This was anticipated, as during drilling within the dolomite at the Zinc Shop,
 a water-producing zone was intersected in the upper 10 to 15 feet of the dolomite which likely represents a
 weathered zone or fracture zone within the dolomite.

 Estimates of average linear groundwater flow velocity for the glacial deposits beneath the Zinc Shop and Chrome
 Shop were made. At the Chrome Shop, the average horizontal hydraulic gradient to the north and south of the
 groundwater collection system was 0.04 ft/ft and  the average horizontal gradient within the radius of influence of
 the extraction sump was 0.45 ft/ft.  Estimated groundwater flow velocity values for the area not influenced by the
 extraction sump at the Chrome Shop are between 0.4 feet/year and 1.3 feet/year. Groundwater within the radius of
 influence of the extraction system has an average linear velocity of 5.0 feet/year to 15.1 feet/year.

 The average horizontal hydraulic gradient for the portions of the Zinc Shop not influenced by the groundwater
 collection system was 0.02 ft/ft and the average horizontal gradient within the radius of influence of the extraction
 sump was 0.1 ft/ft.  Estimated groundwater flow velocity values for the area not influenced by the extraction sump
 at the Zinc Shop are between 0.2 feet/year and 0.7 feet/year. Groundwater within the radius of influence of the
 extraction system has an average linear velocity of 1.1 feet/year to 3.4 feet/year.

 Vertical groundwater flow velocity values cannot be accurately estimated because vertical hydraulic conductivity
 values were not measured. Based on the slow recovery rates of the bedrock piezometers and the water level in
 Chrome Shop bedrock piezometer B-101 prior to being purged for sampling, downward movement of groundwater
 from the glacial deposits to the dolomite bedrock constitutes a component of groundwater flow at both sites.  The
 slow recovery rates of the bedrock piezometers also indicates that groundwater movement, including a downward
 migration of contaminated groundwater, occurs at an extremely slow rate.

 C. Contaminant Summary

 Two rounds of groundwater samples were collected approximately one month apart from monitoring wells installed
 during the RI, selected existing site monitoring wells, and the Grant Street municipal water supply well.  In addition,
 one groundwater sample was collected from a nearby private water supply well.  Groundwater samples were
 submitted for laboratory analysis through U.S. EPA Central Regional  Laboratory's (CRL's) contract laboratory
 procedure (CLP) program for target analyte list (TAL) metals, hexavalent chromium, target compound list (TCL)
 VOCs, cyanide, and total organic carbon (TOC).  The samples were also analyzed in the field for pH, temperature,
 conductivity, color, odor and clarity. Because of the low hydraulic conductivity of the geologic materials at the site,
 sufficient groundwater was not available at all locations for collection of all parameters.

 A summary of all compounds with confirmed detections above enforcement standards (ES) is presented in Table 1.

 1.  Chrome Shop

 1.1  Hexavalent Chromium

The Chrome Shop sump and all monitoring wells  installed during the RI and B-101 were sampled on two events for
hexavalent chromium except MW-106B, MW-107B, and MW-108B.  The three listed bedrock wells did not contain
sufficient water for collection of a sample for analysis.
                                                -  14  -

-------
 Hexavalent chromium was detected in samples collected from the Chrome sump (620,000 and 300,200 parts per
 billion ppb)), the French drain (25,800 and 32,000 ppb), MW-109 (6,780, 2,400, and 3,100 (duplicate) ppb) and
 MW-113 (140, and <10 ppb). A third sample was collected at MW-113 to confirm the presence of hexavalent
 chromium at this location. The third sample contained 43 ppb hexavalent chromium.

 1.2 Inorganic Compounds

 The quantity of water in some monitoring wells was not sufficient for collection of samples for metals and cyanide
 analysis. As a result, monitoring wells MW-106B, MW-107B, MW-108B, and MW-109B were not sampled for
 metals and cyanide during the RI and B-101 was sampled once for metals (8/94) but never for cyanide. Sampling
 results are summarized below. Of the 24 inorganic analytes, nine were detected at concentrations in excess of
 current or proposed NR140 Groundwater Quality Enforcement Standards (ESs) and/or Preventive Action Limits
 (PALs).

 The ES for antimony is 6.0 ppb, and the NR140 PAL is 1.2 ppb.  The ES was exceeded in samples collected from
 the Chrome Shop sump, the french drain, MW-106, MW-109, MW-112, and MW-113 during one sampling event.
 The laboratory data may be falsely positive and antimony may not be present in groundwater at the Chrome Shop in
 concentrations of concern. However, the groundwater monitoring plan should include collection of samples for
 antimony analysis until it is possible to prove or disprove that antimony contamination is present at concentrations
 of concern in area groundwater.

 The samples collected from the Chrome Sump and the french drain in October 1994, exceed the ES of 50 ppb for
 arsenic; however, arsenic  was not detected in the previous sampling event in either sample. Arsenic is not a primary
 contaminant of concern in groundwater at the Chrome Shop because of its limited extent.

 Beryllium was detected in excess of the 4 ppb ES in the October 1994 sample collected from the Chrome Shop
 sump; however, the beryllium was not detected in the sump sample collected previously (August 1994).  Beryllium
 is not expected to be a primary contaminant of concern at the Chrome Shop site. The groundwater plan for the site
 should include beryllium analyses until a time when it is possible to prove or disprove that beryllium contamination
 is present at concentrations of concern in the area groundwater.

 Cadmium was detected at 17.7 ppb in the August 1994 sample from the Chrome sump which is in excess of the 5
 ppb ES. The August 1994 french drain sample contained cyanide at 74.9 ppb which is in excess of the NR140 40
 ppb PAL.  Iron was detected at 315 ppb in the October 1994 sample collected from MW-110 which is in excess of
 the 300 ppb ES.  Lead was detected in excess of the 1.5 ppb PAL in August 1994 samples collected from B-101,
 MW-106, MW-106A, MW-107, MW-110, and MW-113.  These were the only cadmium,  cyanide,  iron and lead
 detections in excess of NR140 standards at the Chrome Shop.

 The NR140 welfare based ES for manganese is 50 ppb; the PAL is 25 ppb. The PAL and  ES was exceeded in one
 or more samples collected from the following locations: french drain, MW-106, MW-107A, MW-108, MW-108A,
MW-109A, MW-110, MW-110A, MW-111, MW-113, and MW-114. Only the PAL was exceeded for one or more
samples collected from MW-107 and MW-109.

The ES for nickel is 100 ppb; the PAL for nickel is 20 ppb. The August 1994, Chrome Shop Sump sample and the
October 1994, MW-107 sample exceed the ES for nickel.  The October 1994, Chrome Shop sump sample and the
August 1994 MW-110 sample exceeded the PAL for nickel. Silver was detected in excess of the NR140 50 ppb ES
in the August 1994 Chrome Shop sump sample. The October 1994 samples collected from the Chrome Shop Sump,
the french drain, and MW-106 exceeded the 2 ppb ES for thallium. These were the only nickel, silver, and thallium
detections in  excess of the current NR140 standards.
                                              -  15  -

-------
 The ES for total chromium is 100 ppb; the PAL is 10 ppb. Both samples collected from the Chrome Shop sump, the
 french drain, and MW-109 exceeded the NR104 ES for total chromium. In addition, the August, 1994 sample
 collected from MW-113 exceeded the PAL for total chromium. Chromium is the primary contaminant of concern at
 the Chrome Shop site.  The extent of chromium impacts in groundwater is identical to the area affected by
 hexavalent chromium as shown on Figure 8.

 1.3 Volatile Organic Compounds

 Due to an insufficient quantity of water, VOC samples could not be collected from B-101, MW-106B, MW-107B,
 MW-108B, and MW-109B. Results for the remaining  samples are summarized below. The August 1994 sample
 collected from the Chrome Shop sump exceeded the ES for 1,1-dichloroethene (1,1-DCE). The August 1994
 sample collected from MW-110A exceeded the ES for 1,2-dichloroethane (1,2-DCA). Both the August and October
 1994 samples collected from the Chrome Shop sump exceeded the ESs for 1,1,1-trichloroethane (1,1,1-TCA),
 trichloroethene (TCE). and tetrachloroethene (PCE). There were no other VOC detections in excess of NR140
 standards at the chrome shop site. Only samples collected from the chrome sump and french drain contained VOCs
 in more than one sampling event. Thus, the presence of VOCs at other locations is suspect because the detections
 have not been confirmed.  The groundwater monitoring plan for the site should include VOC analyses until a time
 when it is possible to prove or disprove that VOCs are present at concentrations of concern in the groundwater.
 Figure 9 presents the extent of VOCs in the groundwater surrounding the Chrome Shop site.

 2.  Zinc Shop

 2.1 Hexavalent Chromium

 The Zinc Shop sump and all monitoring wells installed during the RI were  sampled on two events for hexavalent
 chromium except MW-5B, MW-6B, and MW-11.  The two bedrock wells, MW-5B and MW-6B, did  not contain
 sufficient water for collection of a sample for analysis.  MW-11 was not accessible during one sampling event.

 Hexavalent chromium was detected in samples collected from the Zinc sump (89,000 and 144,900 ppb), MW-5
 (1,590, 460 and 510 (duplicate) ppb), MW-6 (15,900 and 47,000 ppb), MW-9 (400 and 470 ppb), and MW-10
 (60,300 and 60,800 ppb).

 The highest detected concentration of hexavalent chromium was 144,900 ppb in the October 1994 Zinc Shop  sump
 sample.

2.2 Inorganic Compounds

The quantity of water in some monitoring wells was not sufficient for collection of samples for metals and cyanide
analysis.  As a result, monitoring wells MW-5B and MW-6B were not sampled for metals and cyanide during the
RI, and MW-4B was sampled twice for metals but only once for cyanide. MW-11 was only sampled once for
metals and cyanide because the well was inaccessible during one sampling  event.  Sampling results are summarized
below.  Of the 24 inorganic analytes, 10 were detected at concentrations in  excess of NR140 Groundwater Quality
ESs or PALs.

The NR140 ES for antimony is 6.0 ppb, and the PAL is 1.2 ppb. The ES for antimony was exceeded in samples
collected from the Zinc Shop sump, MW-4, MW-4A, MW-4B, MW-5, MW-6, MW-7, MW-8, and MW-10 during
one sampling event. None exceeded the ES for both sampling events. The groundwater monitoring plan for the site
should include continued antimony analysis until it is possible to prove or disprove that antimony contamination is
present at concentrations of concern in the groundwater.
                                              -  16  -

-------
 The ES for beryllium is 4 ppb; the PAL for beryllium is 0.4 ppb. Beryllium was detected in excess of the ES in one
 of the two samples collected from the Zinc Shop sump and MW-8.  Beryllium is not a likely primary contaminant
 of concern at the Zinc Shop site.  However, the groundwater monitoring plan for the site should include beryllium
 analysis until it is possible to prove or disprove that beryllium contamination is present at concentrations of concern
 in area groundwater.

 Cyanide was detected in excess of the ES for both samples collected from the Zinc Shop sump, and for one of the
 two samples collected from MW-10. One of the two Zinc Shop sump samples and one sample from MW-8, MW-
 12, and MW-13 exceeded the ES for iron. The NR140 ES for lead was exceeded in one of the two samples
 collected from MW-6A and MW-9. These were the only cyanide, iron, and lead detections in excess of NR140
 enforcement standards at the Zinc Shop.

 The NR140 welfare based  standard for manganese is 50 ppb; the PAL is 25 ppb. The ES was exceeded in one or
 more samples collected from the following locations: MW-4, MW-4A, MW^4B, MW-6, MW-7, MW-10, MW-12,
 and MW-13. Nickel was detected in excess of the ES in both samples collected from MW-10. Thallium was
 detected in excess of the NR140 ES of 2 ppb  in one of the two samples collected from the Zinc Shop sump, MW-4,
 MW-4A, MW-4B, MW-6, MW-10, and MW-13. These were the only manganese, nickel and thallium detections in
 excess of NR140 enforcement standards.

 The ES  for chromium is 100 ppb; the PAL is  10 ppb. Both samples collected from the Zinc Shop sump, MW-5,
 MW-6, MW-9, and MW-10 exceeded the ES for chromium. Chromium is the primary contaminant of concern at
 the Zinc Shop site. The extent of chromium impacts in groundwater is identical to the area affected by hexavalent
 chromium as shown on Figure 10.

 2.3 Volatile Organic Compounds

 Due to an insufficient quantity of water, VOC samples could not be collected from MW-5B during the October,
 1994 sampling event and from MW-6B during either sampling event. MW-11 was sampled for VOCs only once
 because the well was not accessible during one sampling event. The October, 1994 Zinc Shop sump sample
 contained 5 ppb carbon tetrachloride which is equal to the ES of 5 ppb. The PAL for TCE is 0.5 ppb. The sample
 collected from MW-5 in August 1994 exceeded the ES of 5 ppb for 1,2-DCA (6 ppb) and the ES of 0.6 ppb for
 1,1,2-TCA (3 ppb). MW-13 contained benzene above the 5 ppb ES in both sampling rounds (11 and 7 ppb) and as
 many as 28 tentatively identified compounds (TICs). MW-13 also had levels of ethylbenzene, toluene, and xylene
 below groundwater standards in the March 1995 sample.  BETX compounds are not found in the Zinc Shop sump
 area and so the VOCs detected at MW-13 are probably from another source, most likely the former aboveground
 tank storage area formerly located along the railroad tracks or some other petroleum related source. There were no
 other VOC detections in excess of NR140 standards at the Zinc Shop site. The extent of VOC impacts in
 groundwater at the Zinc Shop Site is presented in Figure 11.

 3. Municipal Well Water Quality

 Two rounds of samples were collected from the Grant Street Municipal well located 250 feet northwest of the Zinc
 Shop (Figure 2-1).  A sample and a duplicate were collected during each sampling event. The samples were
 analyzed for TAL metals, hexavalent chromium, cyanide, and TCL VOCs. Hexavalent chromium and cyanide were
not detected in any of the municipal well samples. The August 1994 sample and duplicate sample both contained an
estimated 1 ppb chloroform. The PAL for chloroform is 0.6 ppb; the ES is 6 ppb. There were no other VOCs
detected in any of the municipal well samples. The October 1994 sample and duplicate sample contained 154 ppb
iron. The NR140 welfare based ES is 150 ppb.  There were no other metals detected in the municipal well samples.
The municipal well was found to be unaffected by the contamination at the Chrome or Zinc Shops at the time of the
sampling.


                                              - 17 -

-------
4. Private Well Water Quality

One private well, located near the Chrome Shop (Figure 1) was sampled as part of the RI. The sample was analyzed
for TAL metals, hexavalent chromium, cyanide, and TCL VOCs. There was no hexavalent chromium, cyanide, or
VOC compounds detected in the private well sample. There were no TAL metal compounds detected in excess of
NR140 groundwater quality standards. The private well was found to be unaffected by the contamination at the
Chrome Shop at the time of the sampling.

5. Basement Sump (Foundation Drain') Water Quality

In 1986, three rounds of samples were collected from the 401 S. Sixth Street basement sump south of the Zinc Shop.
The samples all contained chromium in excess of groundwater ESs. Ten basement sumps surrounding the Chrome
and Zinc shops were sampled as part of the September 1991, WDNR resident basement survey/sampling project.
The samples were analyzed for chromium, zinc and cyanide. The chromium.concentration in the sample collected
from 548 Butler Street, located near the Zinc Shop, exceeded the groundwater ES. This was the only ES exceeded
during this sampling event. The sump at 401 S. Sixth Street was dry during this event so it could not be resampled.
Eight basement sumps were sampled as part of the RI. Of these, the sample collected from 548 Butler Street
(located near the Zinc Shop) exceeded the ES for total chromium and iron; the 1030 Sixth Street (located near the
Chrome Shop) sample exceeded the ES for iron and manganese; and the 1031 S. Sixth Street (located near the
Chrome Shop) sample exceeded the ES for iron, lead, and manganese.  The iron, manganese, and lead detections are
not likely related to the former plating operations, but rather the result of natural background conditions in
groundwater.

6. USGS Well Background Water Quality

Two wells (USGS and USGS-A) had previously been installed on the West De Pere High School property,
approximately 2,000 feet from the Chrome Shop site by the USGS.  These wells were sampled as part of the RI to
evaluate the background water quality. Well USGS was sampled for TAL metals, hexavalent chromium, TCL
VOCs, and TOC.  Well USGS-A was sampled for TAL metals, hexavalent chromium, cyanide, TCL VOCs, and
TOC. There were no VOC, hexavalent chromium, and cyanide detections in these wells. The highest detected TOC
concentration was 9.4 ppb in USGS-A. The USGS-A sample contained 6.5 ppb antimony (ES 6.0 ppb); 1.0 ppb
beryllium (PAL 0.4 ppb); 11.9 ppb chromium (ES 10 ppb); 2,790 ppb iron (ES 300 ppb); 4.9 ppb lead (PAL 1.5
ppb); and 38.6 ppb manganese (PAL 25 ppb). The sample collected from well USGS exceeded the PAL for
antimony and beryllium. There were no other detections in excess of NR140 standards.

7. Extent of Groundwater Impacts

7.1 Chrome Shop

Nine inorganic compounds were detected at concentrations in excess of NR140 ESs:  antimony, arsenic, beryllium,
cadmium, chromium, iron, lead, manganese, nickel, silver, and thallium. Antimony, arsenic, beryllium, cadmium,
iron, lead, nickel,  silver, and thallium detections were present at concentrations in excess of NR140 ESs during only
one of the sampling events; thus, the presence of concentrations of these constituents above NR140 ESs was not
confirmed. Manganese and chromium, however, were detected above NR140 ES levels at sampling points for more
than one sampling event. Manganese concentrations ranged from 10.2 ppb to  197 ppb. Manganese concentrations
as high as 50 ppb have been detected in De Pere water supply wells. Variations in manganese concentration do not
appear to be related to known site source areas.  Based on the widespread, variable occurrence of manganese, and
the lack of any known site sources for manganese contamination, it appears likely the detected manganese is related
to naturally occurring conditions in the area.
                                              -  18  -

-------
 Therefore, chromium (both total and hexavalent) is the primary inorganic contaminant.  Chromium was not detected
 above NR140 PALs in any of the intermediate piezometers, thus, the vertical extent of contamination is limited to
 the upper 25 feet or less of the unconsolidated deposits. Figure 8 presents the approximate lateral extent of
 chromium contamination at the Chrome Shop site.  The highest total chromium and hexavalent chromium
 concentrations were detected in the Chrome Shop sump and the french drain. The western extent of the
 contaminant plume reaches into the yards of the residential properties adjacent to the site, extending to a point
 between MW-109 and MW-110. The northern extent of the contaminant plume lies between the Chrome Shop
 sump and MW-106, the eastern extent of the contaminant plume lies between the sump and MW-107, and the
 southern extent of the contaminant plume lies between the french drain and MW-11 l/MW-108. Another separate
 plume is present in the MW-113 location; however, average concentrations calculated from the three samples
 collected from this location do not appear to exceed NR140 ESs. This plume is likely related to the former drum
 storage  area and is relatively small in extent.

 Four volatiles were detected in excess of NR140 ESs in the Chrome Shop sump (1,1-DCE, 1,1,1-TCA, TCE, and
 PCE). Of these, 1,1,1-TCA, TCE, and PCE were detected during both sampling events. The only other VOC
 detected at NR140 standard level was an estimated 5 ppb 1,2-DCA (PAL 0.5 ppb, ES 5 ppb) in the August 1994
 sample collected from MW-110. No VOCs were confirmed in a later sample collected from MW-110; thus, VOC
 contaminants in this area are suspect and may not represent actual site conditions. As the VOC detection in MW-
 110 was only a low, estimated, one-time detection, and the compound is not found at any of the other Chrome Shop
 sampling locations, it is unlikely that this detection is related to site activities. Therefore, the VOC contaminant
 plume is limited to the area of the Chrome Shop sump, and is probably related to solvents used while the plant was
 in operation.  However, the groundwater monitoring plan for the site should include collection  of samples from
 MW-110 for VOC analysis until it is possible to prove or disprove that VOC contamination is present at
 concentrations of concern in the groundwater in this area.  Figure 9 presents the extent of VOC impacts in
 groundwater at the Chrome Shop.

 The groundwater extraction sump currently captures much of the groundwater from within the  area identified as
 impacted and captures all impacted groundwater within the main contaminant plume on the Chrome Shop property.
 However,  the groundwater within the impacted area furthest to the west in the vicinity of MW-109 is not likely
 captured by the existing system. The small chromium contaminant plume at MW-113 is also not likely to be
 addressed by the existing groundwater extraction and pretreatment system.

 7.2 Zinc Shop

 Ten inorganic compounds were detected at concentrations in excess of NR140 ESs - antimony, beryllium,
 chromium, iron, lead, manganese, nickel, selenium, thallium, and cyanide. Of these, only manganese, nickel,
 cyanide, and chromium were detected above ESs at a given sampling point for more than one sampling event.
 Manganese concentrations ranged from 1.9  ppb (Zinc Sump, August 1994) to 764 ppb (MW-13, March 1995).
 Manganese concentrations as high as 50 ppb have been detected in De Pere water supply wells. Variations in
 manganese concentrations do not appear to be related to known site source areas.  Based on the widespread, variable
 occurrence of manganese, and the lack of any known site source areas for manganese contamination, it appears
 likely the detected manganese is related to naturally occurring conditions in the area.

 Therefore, chromium (both total and hexavalent), cyanide, and nickel are the primary inorganic contaminants.
None of these compounds were detected above NR140 PALs in any of the intermediate piezometers, thus the
vertical extent of contamination is limited to the upper 25 feet of the consolidated deposits. Figure 10 presents the
approximate lateral extent of hexavalent and total chromium contamination at the Zinc Shop site. The chromium
concentration exceeded the ES of 100 ppb for both samples collected from the Zinc Shop sump, MW-5, MW-6,
MW-9, and MW-10. The ES for cyanide was exceeded for both sump samples  and for the August, 1994, MW-10
sample.  The ES for nickel was exceeded in both of the samples collected from MW-10.  Based on these results, the


                                               -  19 -

-------
 lateral extent of the contaminant plume has been defined by the current monitoring network, and extends across the
 Zinc Shop property, partially encompassing adjacent properties to the south, southeast, and east.

 Two volatiles were detected in excess of NR140 PALs (1,2-DCA and 1,1,2-TCA) for the August 1994 sample
 collected from MW-5.  The October, 1994 Zinc Sump sample exceeded the ES for carbon tetrachloride. These
 VOC detections were qualified as estimated by the data validator. Based on the small, one-time detections, there
 appears to be only limited VOC contamination at the Zinc Shop site. MW-13 contains benzene at concentrations of
 7 and 22 ppb which exceeds the 5 ppb ES. MW-13 also has detectable concentrations of petroleum type tentatively
 identified compounds (TICs) indicating a source other than Better Brite for the groundwater impacts.  Figure 11
 shows the extent of VOC impacts in groundwater which exceed NR140 standards.

 The groundwater extraction sump currently appears to capture the groundwater impacted with chromium.  The
 capture zone created by the extraction sump, combined with the natural groundwater flow pattern, will likely also
 result in the capture of VOC impacts in the vicinity of MW-13. However, petroleum related impacts near MW-13
 likely originated from a source other than the Zinc  Shop and their extent has not been completely determined to the
 north, east, or south.

 V.       SUMMARY OF SITE RISKS

 A.  Qualitative Risk Characterization

 A qualitative assessment was completed for the site as the remedy to be selected must be protective of human health
 and the environment, and comply with ARARs. The state groundwater quality standards are protective of human
 health and the environment. A quantitative risk assessment serves two primary purposes: 1) to indicate whether the
 risks a site poses to humans and the environment justify further action; and 2) to help determine what levels of
 environmental remediation are needed. At this site, because these issues are already addressed through the health-
 based ARARs, it was determined that a qualitative risk assessment was sufficient. Selection of a remedy which
 complies with state administrative codes therefore will be protective of human health and the environment.

 1. Selection of Contaminants of Concern

 Contaminants of concern (COCs) are those contaminants migrating from the sites that have the  potential to affect
 human health. Isolating these contaminants from the list of those that may be present at the site allows the assessor
 to focus on fewer, more important contaminants. COCs for the groundwater pathway are selected by comparing
 sample results to state standards.  These are health based standards developed by the Wisconsin Department of
 Health (WDOH) and the WDNR to be protective of public health. A contaminant may also be retained as a COC if
 a health based standard has not been established.

 2. Land Use. Water Supplies and Groundwater Use

 Both the Chrome and Zinc Shops are located in a mixed residential/commercial area in the City of DePere, WI.
 Land use is comprised primarily of single family homes.  Commercial businesses near the Zinc  Shop include a seed
 company, and overnight freight company, a heating and cooling company and a foundry (located on South Sixth
 Street). Basic land use near the sites is expected to  remain the same into the forseeable future.

 The City of DePere water system is comprised of six municipal wells, all of which are within 3 miles of the Better
 Brite sites. An additional municipal well in the City of Allouez is  also within 3 miles of the Better Brite sites.  The
population of the City of DePere is approximately 16,500 and the population of the City of Allouez is
approximately 15,000.  City of DePere Well #2 (aka Grant Street Well) is the closest municipal well to both sites.
It is located approximately 250 feet from the Zinc Shop and supplies approximately 13% of the  City of DePere's


                                                -  20  -

-------
 water. This well was sampled for contaminants of concern during the RI and is currently sampled annually for
 chromium and volatile organic compounds (VOCs).

 In September, 1991 a door to door survey was conducted by the WDNR and City of DePere to identify any private
 wells near the Better Brite sites. The results indicated the presence of five unused and two in use private wells. One
 in use well (located ate 1026 South Seventh Street) was sampled without detection of contamination related to the
 sites. The other in use well was not sampled because it was located over 3,300 feet from the sites. Of the unused
 wells, one or two may require abandonment.

 The current source of city drinking water is the deep sandstone aquifer. Half of the private wells in the city are
 generally less than 105 feet deep, indicating that the wells draw water from the dolomite aquifer. Monitoring wells
 indicate that the contamination at the Zinc and Chrome Shops is restricted to the upper clay till unit and that
 contamination extends approximately 20 to 25 feet deep. The clay unit is approximately 30 feet deep and is
 underlain by dolomite. The  clay unit can not produce usable quantities of water. However, groundwater gradients
 at both sites are downward,  indicating that if the contaminated groundwater in the clay is not controlled, the deeper
 dolomite and sandstone units are at risk of contamination.  A future risk to the city water supply does exist because
 of the proximity of private and municipal wells to the sites.

 3. Groundwater

 There are five unused water supply wells and two actively used private wells in the area of the Better Brite sites.
 The actively used wells are  located at  1026 S. Seventh  Street and 1700 Patriot Way (Figure 1).  The well at 1026 S.
 Seventh Street has been sampled without detection of contamination related to the Better Brite site. The 1700
 Patriot Way well has not been sampled because it is located approximately 3,300 feet  south of the Chrome Shop
 site. Exact well construction reports are not available.  The primary aquifer for the area is the sandstone aquifer that
 supplies drinking water to all the municipalities in the Lower Fox River Valley. The sandstone aquifer annually
 receives approximately 2 to 4 inches of recharge from the overlying material. The City of De Pere's Grant Street
 municipal well, which  is completed in the sandstone aquifer,  is only 250 feet from the Zinc Shop. The municipal
 well was sampled as part of the RI.  There was no contamination detected in the municipal well  related to the Better
 Brite sites.

 As of the date of the RI work, sampling has not detected contamination from the Chrome and Zinc Shops in either
the municipal or private wells.  Based on contaminant extent and distance from water supply wells, area residents
have not been exposed, and  are not currently at risk of exposure, to the groundwater impacts except via basement
 sumps at 401  S. Sixth and 548 Butler,  as detailed above. If the migration of the contaminants is not controlled,
there is the potential for exposure to contaminated groundwater through water supply wells and  additional basement
sumps in the future. Residents using untreated contaminated groundwater could ingest contaminants when drinking
water, inhale contamination released from the water during  domestic uses (cooking, showering,  etc.), and absorb
contaminants through the skin while bathing and washing in contaminated water. It should be noted that the
operation of the groundwater collection systems at each of the sites greatly reduces the likelihood of these future
potential exposures. The possibility is discussed to emphasize the necessity for continued control of the
groundwater contaminant plume.

Because contaminated  groundwater is  a potential future exposure pathway, groundwater COCs need to be
identified. The standard for determining groundwater COCs is the ES. This is a health based standard developed by
the WDOH and the WDNR to be protective of human health and is based on a risk level of 10"6.  The PAL is used to
identify potential contamination problems. An exceedance of the PAL is not necessarily an indication of a short or
long term health hazard.  Detected compounds without  state standards have also been retained as potential COCs.
The highest concentration of each contaminant detected in the groundwater is evaluated as a worst case future
exposure scenario.


                                                -  21  -

-------
 3.1 Chrome Shop

 Table 2 summarizes the compounds which have been detected above the ES in groundwater samples collected at the
 Chrome Shop as well as other COCs, and the compounds' highest detected concentration.  The health (or welfare)
 based groundwater standard is also presented for those contaminants for which a standard has been developed.

 The following compounds are identified as VOC COCs for the future groundwater exposure pathway because the
 highest detected concentration exceeded the ES: 1,1-DCE; PCE; 1,1,1-TCA; and TCE.  Carbon disulfide was also
 retained as a VOC COC because an ES for this compound has not been developed. Analysis of the groundwater
 samples for inorganics detected many commonly occurring parameters in groundwater. Of these, the following
 were identified as inorganic COCs for the future groundwater exposure pathway because the highest detected
 concentration exceeded the ES: antimony, arsenic, beryllium, chromium,  iron, manganese, nickel, silver, and
 thallium. Aluminum, cadmium, calcium, cobalt, hexavalent chromium, magnesium, potassium, sodium, and
 vanadium were also included because an ES has not been developed for these compounds. However, many of these
 compounds exist at background levels for this aquifer. Compounds that exist at background levels are potential site
 related COCs, not primary COCs.

 3.2 Zinc Shop

 Table 3 summarizes the compounds which have been detected above the ES in groundwater samples collected at the
 Zinc Shop as well as other COCs, and the compounds' highest detected concentration. The health (or welfare)
 based groundwater standard is also presented for those contaminants for which a standard has been developed.

 The following compounds are identified as VOC COCs for the future groundwater exposure pathway because the
 highest detected concentration exceeded the ES: carbon tetrachloride; 1,2-DCA; and 1,1,2-TCA.  Carbon disulfide
 was also retained as a VOC COC because an ES for this compound has not been developed. Analysis of the
 groundwater samples for inorganics detected many commonly occurring parameters in groundwater. Of these, the
 following were identified as inorganic COCs for the future groundwater exposure pathway because the highest
 detected concentration exceeded the ES: antimony, beryllium, chromium, cyanide, iron, lead, manganese, nickel,
 and thallium. Aluminum, calcium, cobalt, hexavalent chromium, magnesium, potassium, sodium, and vanadium
 were also identified because an ES has not been developed for these compounds. However, many of these
 compounds exist at background levels for this aquifer. Compounds that exist at background levels are potential site
 related COCs, not primary COCs.

 B.  Public Health Consultation

 The Wisconsin Department of Public Heath, with the concurrence of the Agency for Toxic Substances and Disease
 Registry, completed an evaluation of the public health risks for the private residences near the Zinc Shop. This
 evaluation is entitled "Public Heath Consultation, Basement Seepage Near the Better Brite Zinc Shop".  The
 evaluation found that the chromium contaminated dust and water seepage within the basements of the homes poses
 a public heath hazard and recommended that steps  be taken to prevent people from being exposed to the
 contaminants.

C. Rationale for Further Action

Actual or threatened releases of hazardous substances from this site, if not addressed by the response action selected
 in this ROD, may present an imminent and substantial endangerment to public health, welfare, or the environment.

VI.     Description of the Remedial Alternatives
                                               - 22 -

-------
 A.      Remedial Action Objectives

 Remedial action objectives were developed for this site to address the groundwater and soil contamination and to
 provide short and long-term protection of human health and the environment and to meet applicable or relevant and
 appropriate requirements.

 The NCP at Section 300.430(a)(l)(iii)(F), provides that under CERCLA, U.S. EPA will return usable groundwaters
 to their beneficial uses wherever practicable, within a time frame that is reasonable, given the particular
 circumstances of the site.  When restoration of groundwater to its beneficial uses is not practicable, U.S. EPA
 expects to prevent further migration of the contaminant plume, prevent exposure to the contaminated groundwater,
 and to evaluate further risk reduction.

 The initial groundwater objective is to protect the underlying bedrock aquifer and contain and/or control the further
 migration of contaminants. The long term remedial objective for the Better Brite site is to reduce the contaminant
 concentration in groundwater to meet state  and/or federal groundwater quality standards, whichever are more
 stringent. An action that meets both objectives quickly may be selected for the site or a portion of the site, if it is
 feasible and practicable.

 In addition to federal standards, or Maximum Contaminant Levels (MCLs), the State of Wisconsin has established
 groundwater quality standards in NR 140, Wisconsin Administrative Code (Wis. Adm. Code). Wisconsin's
 groundwater code, which is an applicable requirement for remediation of the site, is more stringent than federal
 standards. NR 140, Wis. Adm. Code, requires remediation of groundwater to meet numeric health based standards.

 The purpose of the basement/foundation portion of the remedy is to prevent human contact with the contaminated
 soil, dust and groundwater at the residences near the Zinc Shop.

 B.      Development of Alternatives

 The Focused Feasibility  Study (FFS) for the site developed a list of possible remedial technologies to address the
 remedial action objectives which were screened and narrowed down based on cost, implementability and
 effectiveness.  Alternatives were assembled from the  technologies that survived the screening process. In addition
 to remedial action alternatives, the NCP requires that a no-action alternative also be considered for the site.  The no-
 action alternative serves  primarily as a point of comparison for the other alternatives.

 C.      Description of Alternatives

 Groundwater Control Alternatives

 1  Alternative A - No Action

Evaluation of a No Action alternative is required by CERCLA guidance in order to provide a baseline against which
other alternatives can be compared. This alternative consists only of continued groundwater monitoring at the
Better Brite sites. No action would be performed to collect or treat groundwater. The No Action alternative would
rely on natural processes such as dilution, dispersion,  adsorption, precipitation, and degradation to attenuate the
impacted groundwater. The time to fully attenuate  the plumes as a result of these natural processes is difficult to
predict for several reasons. The attenuation is dependent on a host of soil properties such as cation exchange
capacity, effective porosity, and other parameters defining the subsurface geochemistry.  All of these properties
would also be expected to change with soil type.  The actual geochemical processes which work to attenuate the
chrome are also subject to much uncertainty. Thus  further definition of the downgradient soils and testing of the
pertinent soil properties would be helpful but still would not eliminate some of the considerable uncertainty  in


                                                 - 23 -

-------
 predicting the attenuation. Additionally the impermeable nature of the soil makes travel times through the aquifer
 extremely lengthy.  Estimates indicate this will likely take in excess of 20,000 years for the No Action alternative to
 comply with ARARs. Thus, under this alternative, the plume would spread considerably before the concentrations
 are reduced to within allowable limits.

 Semi-annual groundwater sampling and analysis at select monitoring wells would be conducted to document trends
 in contaminant concentrations. Locations of the wells will be selected to characterize variations in contaminant
 concentrations near the center of the contaminant plumes, and also near the  leading edge of contamination as
 definable with existing monitoring wells.

 To accomplish this monitoring, 14 monitoring wells and the sump would be used at the Chrome Shop and 13
 monitoring wells and the sump would be monitored at the Zinc Shop.  In addition there is one private and one
 municipal water supply wells which would also be monitored. All of the selected wells were monitored during the
 Remedial Investigation (RJ) in 1994 and 1995. These wells provide both a representation of the existing plume as
 well as the most likely contaminant migration pathways.

 Groundwater samples will be analyzed for field parameters,  VOCs, metals, cyanide, and hexavalent chromium.
 Additionally, groundwater elevations will be measured at all monitoring wells during each sampling event. This
 information will be used to confirm groundwater flow direction in the various hydrogeologic units and to confirm
 previous identification of likely contaminant migration routes. There are no capital costs for this alternative. The
 annual O&M costs for the alternative are $87,200, and the total present worth cost is $ 1,082,100, based on
 monitoring over 30 years.

 2 Alternative B - Limited Action

 This alternative is comprised of the recovery and treatment activities which are currently in operation at the Better
 Brite sites, that is, recovery of groundwater from the existing sumps and pretreatment at the existing precipitation
 pretreatment facility. Water is discharged to the local POTW. Institutional controls would be used to supplement
 these actions and prohibit any land use which might interfere with the remedial activities.  Specifically, this is
 assumed to include fences around the existing sumps and clay cap to restrict access, and deed restrictions to prevent
 installation of wells within the impacted aquifer. Inclusion of this alternative in the FS  is intended to allow
 assessment of the feasibility of continued operation and maintenance of the existing recovery and pretreatment
 equipment.

 At the Zinc Shop site, groundwater is collected in the existing sump and is transported via vacuum truck to the
 holding tank of the water pretreatment system located at the Chrome Shop site. Impacted groundwater from the
 Chrome Shop site is collected in the sump and is pumped to the holding tank of the water pretreatment system. The
 total volume of groundwater collected for pretreatment between April 1994 and March  1995 from the Chrome  Shop
 site and the Zinc Shop site was approximately 48,000  gallons and 80,000 gallons, respectively.

 Hydrogeological studies have determined that the sump at the Zinc Shop is providing complete capture of the
 impacted groundwater at the Zinc Shop site.  The sump at the Chrome Shop is not providing capture of all of the
 impacted groundwater from the Chrome Shop site. A small plume  of impacted groundwater located west of the
 Chrome Shop sump is not being completely captured by the existing sump.  It should be noted that natural
 attenuation processes such as dilution, dispersion, adsorption, precipitation, and biodegradation will tend to reduce
the organic and inorganic contaminant concentrations  present hi the groundwater with time. Estimates indicate it
will likely take in excess of 1,800 years to comply with ARARs under the limited action alternative. Thus, under
this alternative, the non-captured portion of the Chrome Shop plume would spread considerably before the
concentrations are reduced to within allowable limits.
                                                -  24  -

-------
 The existing batch pretreatment plant, which is housed in a prefabricated building, has a holding tank which is used
 to store water prior to batch pretreatment. Once the tank is nearly full, the contents of the tank are pumped to the
 batch pretreatment tank for pretreatment.  Typically, a volume of 5,600 gallons of water is pretreated at a time.

 Sulfuric acid, sodium bisulfite, and sodium hydroxide are the chemicals used in the precipitation process.  The
 resulting chromium hydroxide precipitate is allowed to settle in the batch pretreatment tank with the aid of an
 anionic polymer flocculating agent.  Other insoluble heavy metal hydroxides such as cadmium, lead, nickel, and
 silver hydroxides are also insoluble at a pH of approximately 8.5 standard units and also form precipitates during
 this process.

 Metal hydroxide sludge is dewatered in a plate and frame filter press, thus reducing the volume, toxicity and
 mobility of the waste stream compared to the volume of impacted groundwater being treated.  The dewatered metal
 hydroxide sludge cake is transported and disposed off-site at a licensed RCRA treatment, storage and disposal
 facility as characteristic hazardous waste (D007).  According to the U.S. EPA document entitled "A Water
 Treatment System For Removal of Chromium from Groundwater", one drum (55  gallons) of dewatered sludge is
 formed for every 5,000 gallons of groundwater treated. This is confirmed by records of the initial period  of
 operation.  Therefore, given an estimated groundwater influent rate of approximately 130,000 gallons per year, the
 amount of dewatered sludge formed annually is expected to be 26 drums.

 Pretreated water is decanted from the batch pretreatment tank and is discharged to the City of De Pere sanitary
 sewer for final treatment at the De Pere POTW. Chromium is the only constituent that requires treatment prior to
 discharge.  Available information from the existing operation indicates that the concentration of total chromium in
 the treated water is below 1 mg/C which is well below the pretreatment limit of 7.0 mg/{. Therefore, the existing
 pretreatment system performance adequately meets the pretreatment limits for the De Pere POTW.

 The VOCs  present in the groundwater are not actively treated by the existing pretreatment plant. It is expected that
 some of the VOCs are volatilized during the pretreatment process, or possibly adsorbed on the sludge, and the
 remaining VOCs are discharged for final treatment at the De Pere POTW.  The low levels of VOCs in the discharge
 do not pose a problem at the De Pere POTW. However, VOC removal could become necessary in the future should
 pretreatment standards for VOCs be  established that are below the current discharge concentrations.

 The De Pere POTW, which currently operates the pretreatment system, has  indicated that there are no indications of
 problems with the existing pretreatment system. While historical data indicate that some minor difficulties were
 experienced upon system startup, it appears that the operation of the system is now essentially trouble-free.

 The current O&M agreement with the City of De Pere POTW expires during 1996. The extension of the agreement
 between the WDNR and the City of De Pere to operate the system appears possible based on discussions with both
 parties.  However, there are administrative issues related to manifest responsibilities, monitoring, and maintenance
 which would need to be addressed if the system is used as a permanent pretreatment alternative. With the City of
 De  Pere's POTW approval, continued discharge of pretreated groundwater to the sanitary sewer would be a more
 attractive alternate than other discharge alternatives because of the availability of the current infrastructure and the
 current experience.

 Institutional controls and access  restrictions would be used to provide additional protection for human health and the
 environment. These include the construction offences around both sites to  limit access to the wells, equipment, and
 clay caps; posting warning signs; and obtaining deed restrictions  on the present and the future use of the Better Brite
sites or other affected properties.

Under this alternative, the only capital costs would be those associated with implementing the institutional controls.
This is estimated at $5,000.  Groundwater monitoring would also be required under this option as it would be under


                                                 -  25 -

-------
 the No Action alternative.  Annual operation and maintenance costs as obtained from WDNR for the existing
 groundwater extraction and pretreatment system include:

         1)       Discharge fees to the De Pere POTW;
         2)       Labor (Plant O&M, Administration, Clerical);
         3)       Expenses (Phone and Utilities, chemical analyses, supplies);
         4)       Sludge Transport and Disposal; and,
         5)       Water transport from Chrome Shop to Zinc Shop.

 The estimated annual O&M costs are $118,760 and the 30-year present worth cost is $1,478,700.

 3  Alternative C - Supplemental Groundwater Recovery and Treatment

 This alternative includes a feasible method of providing supplemental groundwater recovery at the Chrome Shop
 site to extract groundwater not currently captured by the existing system.  It also contains an evaluation of the
 existing groundwater recovery system and potential alternatives.

 Currently, groundwater is collected at both the Chrome Shop and Zinc Shop at each site's respective groundwater
 sump. The radius of influence of the sump at the Zinc Shop appears to be adequate in capturing the contaminant
 plume. Therefore, no additional groundwater recovery system is necessary at the Zinc Shop.  The sump at the
 Chrome Shop leaves a small portion of the contaminant plume unaffected. At the Chrome Shop, a comparison of
 the established groundwater capture zone to the known chromium contaminant plume indicates that the impacted
 groundwater to the west, in the vicinity of MW-109, is not captured by the existing system.

 A groundwater recovery trench is the most appropriate means of recovering groundwater, based on the site's
 characteristics.  The installation of a groundwater extraction trench at the western edge of the contaminant plume
 would provide the necessary capture to control the entire plume. Based on the groundwater flow direction and the
 extent of contamination, the groundwater recovery trench should be approximately 100 feet long, 20 feet deep, and
 should be located as shown on Figure 12. Calculations indicate that a trench of this design would recover
 approximately 10,000 gallons per year (27 gallons per day).

 While treatment technologies other than the existing precipitation system are available with the capacity to meet the
 standards for discharge, the existing system  is the most appropriate for the following reasons:

        1)      precipitation is a common and proven method for metals removals and the existing system has no
                operating problems in meeting the discharge limit;

        2)      no additional capital expenditures are required for the existing system, and

        3)      alternative technologies do not offer appreciably lower operation and maintenance costs to offset
                their initial capital expenditures.

One option which was considered was whether a separate pretreatment facility at the Zinc Shop would be
economical.  An initial cost estimate was completed for a separate precipitation unit at the Zinc Shop.  Capital costs
were estimated at $195,000, annual operating costs at $26,400, and present worth costs over a 30 year period at:
$366,000. This compares with the present worth costs for transporting the water and pretreating it at the existing
facility of $230,000.

There is little incentive to explore or implement other pretreatment schemes when the existing system is working
adequately and has acceptable operating costs.  As long as the system can handle the additional load, it appears to be


                                                - 26  -

-------
 the preferred option for on-site pretreatment of the chromium in the groundwater for both the Chrome Shop and the
 Zinc Shop.

 The batch pretreatment plant, which is housed in a prefabricated building, would be used to pretreat the current
 130,000 gallons from the sumps plus an additional 10,000 gallons of groundwater from the proposed supplemental
 trench. Since a volume of 5,600 gallons of water is pretreated at a time, an additional two batches of groundwater
 will require pretreatment each year.  Given that the existing pretreatment plant processes approximately 24 full
 batches, each requiring less than one 8-hour shift, the processing of the additional groundwater would require only a
 minimal increase in time and materials for pretreatment and is well within the capacity of the existing system.

 With the addition of the proposed trench, the volume of groundwater pretreated under this alternative would be
 increased by approximately 8%. It is expected that the required quantities of sulfuric acid, sodium bisulfite, sodium
 hydroxide, polymer, and labor used on an annual basis would also increase by a similar percentage.   Sludge
 disposal would also increase by a similar factor resulting in an annual total of 28 drums of sludge.

 The current system discharges to the De Pere POTW.  For reasons discussed under Alternative B, this is the most
 appropriate discharge option, provided the current discharge agreement can be extended. Infiltration is not a
 technically feasible option in a clay till environment.  Discharge to the storm sewer is a viable option, but would
 require construction of a line from the existing pretreatment facility to the storm sewer and would also require
 permitting of the off-site discharge. Discharge standards for this option might dictate that cyanide and VOCs also
 be pretreated, thus increasing the costs of pretreatment.

 As noted with Alternative B, the VOCs present in the groundwater are not actively treated by the existing
 pretreatment plant. It is expected that some of the VOCs are volatilized during the pretreatment process, or possibly
 adsorbed on the sludge, and the remaining VOCs are discharged for final treatment at the De Pere POTW. The low
 levels of VOCs in the discharge do not pose a problem at the De Pere POTW. However, VOC removal could
 become necessary in the future should pretreatment standards for VOCs be established that are below the  current
 discharge concentrations.

 Institutional controls and access restrictions would also be used under this alternative to provide additional
 protection for human health and the environment as noted in the previous alternatives.  Groundwater monitoring
 would also continue as noted under the No Action alternative.

 Capital costs for this alternative consist of the construction of the new trench and sump and the costs for
 implementing the institutional controls. The capital cost associated with this alternative is $142,600.

 Annual operation and maintenance costs are similar to those under Alternative B with an allowance for the added
 flow. The estimated annual O&M costs are $121,200 and the 30-year present worth cost is $1,646,100.

 4 Alternative D - Groundwater Recovery and Off-site Disposal

 Under this option, groundwater collected would be treated with an evaporation system located at the Chrome Shop
to reduce the volume  of water which requires disposal. Groundwater would be collected as noted under the other
options.

Evaporation involves the vaporization of a liquid from a solution or a slurry. All evaporation systems require the
transfer of sufficient heat from a heating medium to the process fluid to vaporize the volatile solvent which in this
case is water. The vaporized water would be discharged to the atmosphere while the inorganic contaminants would
be concentrated in the water remaining. Evaporator suppliers indicate that up to 95% of the water could be
evaporated but the unit would require frequent cleaning. For the purpose of evaluating this option it has been


                                                - 27  -

-------
 assumed that a 70% reduction in volume is achievable with only monthly cleaning.

 A small evaporator with a capacity of approximately 700 gallons a day would be used and is readily available from
 several suppliers. The units run on propane or natural gas. Waste water is fed into unit based on water level in the
 evaporator until the desired concentration is achieved. The unit then shuts down and is drained. A programmable
 logic controller would be installed to automate the process and reduce operator requirements.  It would, however,
 run almost continuously in an automatic mode.  No pretreatment is necessary. A storage tank would be installed
 downstream of the unit to store the concentrated waste. VOCs in the water would also be vaporized and discharged,
 but emissions would be well below Wisconsin VOC emission limits.

 The capital costs for this alternative, which include an evaporator system, a groundwater recovery trench, storage
 facilities and institutional controls/access restrictions, is estimated at $237,700.  The O & M costs are $164,300 per
 year.  The total 30-year present worth costs of this option are estimated to be $2,275,800.

 5  Alternative E - In-situ Enhancements for Groundwater Remediation

 This alternative includes using the groundwater recovery and treatment system described under Alternative C and
 adding the  necessary equipment to condition the treated water and inject some of it back into the aquifer.  The water
 would require addition of a reducing agent capable of the in-situ reduction of hexavalent chromium  to trivalent
 chromium. As  this water flows through the impacted aquifer towards the recovery sump or trench it would enhance
 the in-situ attenuation of chrome and thus result in a reduction of chromium concentrations in the groundwater.

 This technique  is considered experimental but has had some reported success  in actual applications.  For the Better
 Brite  locations the impermeable soil may have adverse impacts on the treatment, and chromium concentrations,
 which are considerably higher than those cited in the literature, may exceed the ability of the soil to attenuate the
 chrome. The urban environment and surrounding land uses at the Zinc Shop make use of this technique impractical
 because installation of injection trenches through public thoroughfares and private property at the plume boundary
 isn't feasible. Implementation is possible at the Chrome Shop.

 Any effort to implement this technology at the Better Brite site will require a somewhat sophisticated design and
 study effort to determine important parameters related to injection method and capacity, impacts to groundwater
 flow patterns, regulatory requirements for injection, attenuation capacity of the soils, and the optimum chemicals
 and their addition rate. The testing would most likely include a series of laboratory evaluations of potential
 chromium attenuation to soil using different chemical reductants, followed by a field demonstration  of the approach.
 Field  testing might include a yield test on the recovery trench and tracer test in the injection trench to provide data
 on the time of travel between the trenches and determine the effectiveness of the injection of the conditioned water.

 To alleviate concerns associated with the injection, it has been assumed that an additional four monitoring wells will
 be installed in the vicinity of the trenches to ensure that flow is not migrating away from the trenches to
 uncontaminated areas. It has also been assumed that monitoring costs for this alternative will be higher than that for
 other  alternatives in order to assess the impact of the injected water.

Two infiltration trenches are proposed at the Chrome Shop as shown on  Figure 13. They are approximately 80 feet
 long extending along the eastern and western sides of the existing sump. The trench on the western side would
allow  infiltration both towards the sump and towards the recovery trench. The infiltration gallery on the eastern
side of the trench would be sealed with geomembrane on all sides except the one facing the sump to minimize
 infiltration in other directions. The trenches would be filled with pea gravel and a sump to monitor water level.
Based on information obtained during the RI, each open face of the trench will theoretically allow infiltration of
approximately 40 and 50 gallons per day.  For purposes of this analysis  it is assumed that 30 gallons per day will
infiltrate through the three proposed open faces. Thus infiltration is estimated at 32,800 gallons annually while


                                                 -  28 -

-------
 recovery is estimated at 50,000 gallons. The remaining 17,200 gallons will be discharged to the sanitary sewer after
 treatment in the existing system.

 The treatment system would be identical to that currently in-place with some additions to the water stream being
 injected. The water slated for injection would be pumped through an air stripper for removal of residual VOCs.
 The remaining constituents in the water should then match those concentrations which naturally exist in the aquifer.
 Following the air stripper, the reducing agent would be injected into the stripper effluent and stored in a tank with a
 mixer. Water would be pumped from the mix tank to the injection trenches to maintain the desired water level.

 All of the elements of Alternative C would be  included here along with the added treatment equipment and
 construction of the trenches. Operation and Maintenance would require little additional work over the basic pump
 and treat system.  The capital cost for this alternative is $517,300. The annual O&M cost is $170,700 and the total
 present worth cost is $2,635,300.

 6  Alternative F - In-Situ Soil Stabilization and/or Solidification

 This alternative includes using the institutional controls described in Alternative B and in-situ soil stabilization
 and/or solidification. At the Chrome Shop, shallow soil mixing would be used to mix  a dry or fluid treatment
 chemical with the in-place soil to produce a solidified or stabilized end product. This technique has been used
 successfully at many sites across the country.  This technique is not considered feasible for the Zinc Shop since the
 groundwater contaminant plume extends below residences, streets, and other structures.  Thus, this alternative
 assumes Alternative B would be implemented  as it pertains to the Zinc Shop.

 A treatability study would be performed on representative samples of the Chrome Shop soil (including both the
 native clay and, if necessary, the pea gravel used to backfill the sump area) to determine the feasibility of this
 alternative. The treatability study would assess the best stabilization agent for the site, the leachability of the
 contaminants after treatment, the effect of residual VOCs in the groundwater upon stabilization and/or
 solidification,  and the projected permeability of the clay stabilized and/or solidified soils.

 In the event that the treatability study indicates that implementation  of this alternative may reduce the concentration
 of groundwater to below the PALs as specified in the Wisconsin groundwater ARAR, WAC NR140, within a
 reasonable amount of time, then implementation of this alternative may be feasible.  Following the treatability
 study, a field test may also be appropriate to provide additional information as to the permeability of the stabilized
 and/or solidified soil and the leachability of the contaminants.  Should the treatability study find that the alternative
 will achieve enforcement standards (ES), or a level between the ES and the PAL, a NR 140.28 exemption would be
 considered. The granting of a NR 140.28 exemption would not require a revision to this decision document, but
 would be announced to the public, with comments requested. Should the study find that the alternative will not
 achieve remediation goals, then other alternatives would be evaluated (a likely alternative in this instance would be
 alternative C, with a reexamination  of contaminated groundwater conveyance options).

 During construction, a crane-mounted bottom-opened cylinder is lowered into the soil. Inside the cylinder, mixing
 blades mix down to the required depth (approximately 20 feet at the Chrome Shop site) in an up and down motion.
Meanwhile, fluid or powdered stabilization and/or solidification agent is added into the subsurface. A suction is
kept on the head space of the bottom-opened cylinder to pull any dust and vapors to the vapor treatment system
 comprised of a dust collector and activated carbon treatment tanks. The construction method consists of creating
alternating primary columns which are  allowed to set. Secondary columns are then installed which overlap the
primary columns resulting in continuous treatment of the impacted area. The total volume of soil at the Chrome
 Shop site which is estimated to  require treatment is 10,000 cubic yards. Note that some of this area is on residential
property, where access must be obtained. The  extent of the area to be treated corresponds to the area of the
groundwater contaminant plume, which exceeds WAC NR 140 PALs. The depth to which the treatment would


                                                 -  29 -

-------
 occur is 20 feet bgs, which is coincident with the base of impacted groundwater.

 As a result of the stabilization process, the volume of material treated will increase by 10% to 30% depending on the
 treatment chemicals used. This will result in a mound in the treated area or would require excess material be
 shipped off site to return the site to its original grade. For purposes of evaluating this alternative, it is assumed that
 the extra material can be graded and left at the Chrome Shop site. It should also be noted that the nature of the
 solidified soil left in place will restrict future uses of the property in that future subsurface excavation will not be
 possible.

 Under the existing groundwater recovery and treatment program at the Better Brite sites, groundwater collected at
 the Zinc Shop site is transported to the existing pretreatment plant at the chrome Shop site for pretreatment and
 discharge to the DePere POTW. Once stabilization and/or solidification is completed, the groundwater at the
 Chrome Shop should not require recovery and treatment.  However, because stabilization and/or solidification is not
 feasible for the Zinc Shop site, groundwater extraction and pretreatment will still be necessary for the Zinc Shop
 site. Therefore, the existing groundwater pretreatment system at the Chrome Shop will be transported and
 reassembled at the Zinc Shop site as part of Alternative F. Materials and equipment which could be reused at the
 Zinc Shop include two tanks, a filter press, chemical feed tanks, a control panel, an air compressor, desk and
 bathroom fixtures. A new concrete pad would need to be constructed at the Zinc Shop site for installation of a new
 metal walled pretreatment building.

 Operation and maintenance of the pretreatment system at the Zinc Shop would be  required. The capital cost for this
 alternative is $1,318,300.  The annual O&M cost is $103,400 and the total present worth cost is $2,601,400.

 Basement/Foundation Drain Exposure Mitigation Alternatives

 1  Alternative BA - No Action

 Under this alternative no action would be taken to notify residents of potential risks nor remediate the seepage
 occurring into the structures currently. The existing exposures would continue and the potential for future exposure
 would remain. There  are no costs associated with this alternative.

 2  Alternative BB - Limited Action

 Under this alternative  the occupants of the affected structures would be notified of the seepage and the potential
 health risks. Signs warning of possible health impacts could also be provided for posting in the affected structures.
 It would be up to the residents to heed these warnings and reduce exposure to the contaminants. Deed restrictions
 on the affected structures and property to limit use and exposure to the impacted areas would be pursued,  to ensure
 that future occupants would be notified of the potential problems. Responsibility to minimize exposure would fall
 solely on the occupants of the affected structures.

 Letters describing the hazards to all the affected property  owners and occupants would be sent, signs posted either at
the basement entrances or in the impacted basements, and lastly deed restrictions would be placed on the properties
 limiting the uses of the basements and notifying any prospective purchasers of the  potential risks associated with
occupancy of the basements.  The capital cost for this alternative  is $6,400.

3  Alternative BC - Sump (Foundation Drain") Isolation

Under this alterative the institutional controls discussed under alternative BB would be implemented,  and, in
addition, the necessary actions to seal the basement foundation drain openings in the basements.  Impacted
groundwater collected in the foundation drains would be routed to the sanitary sewer.  This would avoid any casual


                                                 - 30  -

-------
 exposure to the impacted groundwater.

 The drains already contain suitable pumps and the only actions necessary to properly seal them is installation of a
 plexiglass cover with silicone caulking to seal the edges.  Additionally the drains would be cleaned, any sediment
 properly disposed and the sump pump discharge would be rerouted to the sanitary sewer discharge. It is assumed
 that this can be accomplished by installing approximately 20 feet of pipe with appropriate  fittings and valves in the
 basement without having to do any outside excavation. Ongoing maintenance of the sump pump enclosure is
 assumed to be the owner's responsibility. The capital cost for this alternative is $8,900.

 4 Alternative BD - Wall and Floor Isolation

 This alternative includes the institutional controls and the foundation  drain isolation included in Alternative BC but
 also adds the construction of walls and floors within the  impacted structures to isolate and reduce exposure not only
 to the water collected in the drains but also to seepage through the masonry foundation, walls and floors.  The
 construction of secondary walls and floors within the structures will isolate the masonry and the seepage from
 occupied areas of the basements.

 The estimated capital cost for this alternative is $23,900.  Maintenance is assumed to be the owners responsibility.

 5  Alternative BE - Basement Isolation with External Control

 This alternative includes the institutional controls and the foundation  drain  isolation included in Alternative BC and
 also adds the sealing of the exterior and interior of the basement walls with impermeable, waterproof substances and
 constructing a foundation drain with a sump along the base of the exterior basement walls. The area near the
 basement walls would be regraded to assure surface water drains away from the walls, and roof downspouts would
 be extended/redirected to prevent surface water from ponding near the walls and being collected  in the new
 foundation drains. Pending a determination of the soundness of the building structures and foundations, soil from
 the vicinity of the outside walls would require excavation, sampling, and characterization for off-site disposal in
 order to allow sealing of the outside portions  of the walls and construction of foundation drains.  There is the
 possibility that areas  of  contaminated soil exist near the buildings.  A predesign investigation would be performed
 to determine the  extent of any soil contamination that could pose a health risk or cause additional groundwater
 contamination. If these areas are found, the soil will be removed and  properly treated and disposed of.  This
 alternative would isolate and reduce exposure not only to the water collected in the drains,  but also to seepage
 through the masonry foundation, walls, and floors.

 Both the outdoor and indoor walls would be waterproofed once with a waterproof plaster and once with a tar
 substance.  Additionally, 4-inch diameter drain tile would be installed and pitched to a collection sump.
 Accumulated water from the interior and exterior foundation drains would be discharged to the Zinc Shop sump for
 treatment.  The excavated areas would then be restored with gravel, filter fabric, and black dirt to grade.
 Maintenance is assumed to be the owner's responsibility.

 A predesign investigation of the structural integrity of the existing buildings near the Zinc Shop will be undertaken
to determine if the above actions are feasible.  If it is found that the buildings do not have the structural integrity to
 construct the actions, the actions will be modified to remove as much  risk as possible without endangering building
 structural integrity. The final determination on this will be made as part of the predesign investigation during the
design phase.

The estimated capital cost for this alternative  is $44,800.

VII.    SUMMARY OF COMPARATIVE ANALYSIS OF ALTERNATIVES


                                                 - 31 -

-------
 A.      Introduction

 U.S. EPA has established in the NCP nine criteria that balance health, technical, and cost considerations to
 determine the most appropriate remedial alternative.  The criteria are designed to select a remedy that will be
 protective of human health and the environment, attain ARARs, utilize permanent solutions and treatment
 technologies to the maximum extent practicable, and be cost effective. The relative performance of each of the
 remedial alternatives listed above has been evaluated using the nine criteria set forth in the NCP at 40 CFR
 300.430(e)(9)(iii) as the basis of comparison.  These nine criteria are summarized as follows:

 THRESHOLD CRITERIA - The selected remedy must meet the threshold criteria.

 1. Overall Protection of Human Health and the Environment
        A remedy must provide adequate protection and describe how risks are eliminated, reduced or controlled
        through treatment, engineering controls or institutional controls.

 2. Compliance with Applicable or Relevant and Appropriate Requirements (ARARs)
        A remedy must meet all applicable or relevant and appropriate requirements of federal/state laws.  If not, a
        waiver may be applied.

 PRIMARY BALANCING CRITERIA are used to compare the effectiveness of the remedies.

 3. Long-term Effectiveness and Permanence
        Once clean up goals have been met, this refers to expected residual risk and the ability of a remedy to
        maintain reliable protection of human health and the environment over time.

 4. Reduction of Toxicity, Mobility or Volume Through Treatment
        The purpose of this criterion is to anticipate the performance of the treatment technologies that may be
        employed.

 5. Short-term Effectiveness
        This refers to how fast a remedy achieves protection. Also, it weighs potential adverse impacts on human
        health and the environment during the construction and implementation period.

 6. Implementability
        This criterion requires consideration of the technical and administrative feasibility of a remedy, including
        whether needed services and materials are available.

 7. Cost
        Capital, operation and maintenance, and 30 year present worth costs are addressed.

MODIFYING CRITERIA deal with support agency and community response to the alternatives.

8. State or Federal Acceptance
        After review of the Feasibility Study and the Proposed Plan, the support agency's concurrence or objections
        are taken into consideration.

9. Community Acceptance
        This criterion summarizes the public's response to the alternative remedies after the public comment
        period. The comments from the public are addressed in the Responsiveness Summary attached to this
        document.


                                                -  32 -

-------
 B.       Evaluation of the Remedial Alternatives

 THRESHOLD CRITERIA - The selected remedy must meet the threshold criteria.

 1. Overall Protection of Human Health and the Environment

 a. Groundwater Control and Remediation Options

 1. Alternative A - No Action

 This alternative does not prevent the migration of contaminated groundwater nor return groundwater at the site to its
 beneficial use, as an actual or potential groundwater source, within a reasonable period of tune, nor prevent human
 contact or ingestion of impacted groundwater above NR140, Wis. Adm. Code, standards.  Therefore, it does not
 meet the threshold criteria and will not be considered further.

 2. Alternative B - Limited Action

 This alternative does not prevent the migration of contaminated groundwater nor return groundwater at the Chrome
 Shop to its beneficial use, as an actual or potential groundwater source, within a reasonable period of time, nor
 prevent human contact or ingestion of impacted groundwater above NR140, Wis. Adm. Code, standards at the
 Chrome Shop. Therefore, it does not meet the threshold criteria and will not be considered further.

 3. Alternative C - Enhanced Groundwater Recovery and Treatment
 4. Alternative D - Groundwater Recovery and Off-Site Disposal
 5. Alternative E - In-situ Enhancements for Groundwater Remediation
 6. Alternative F - In-situ Stabilization and/or Solidification

 These 4 alternatives contain all the contaminated groundwater at the site and prevent human contact or ingestion of
 contaminated groundwater through remediation and institutional controls.  Alternative F restores groundwater at the
 Chrome Shop in a much shorter time frame than the other 3 alternatives.

 b. Basement/Foundation Drain Exposure Mitigation Options

 1. Alternative BA - No Action

 This alternative does not prevent human contact with the contaminated soil, dust and groundwater near the
 residences near the Zinc Shop, so it does not meet the threshold criteria and will not be considered further.

 2. Alternative BB - Limited Action

 This alternative depends on the residents to heed posted warnings to prevent exposure to the contaminants.

 3. Alternative BC - Sump Isolation
4. Alternative BD - Wall and Floor Isolation
 5. Alternative BE - Basement Isolation with External Control

These 3 alternatives offer greater protection by  constructing physical barriers to reduce exposure to contaminants in
the basements and foundation drams. Option BE goes further by preventing seepage through the walls,  and by
collecting and treating contaminated water on the exterior of the walls.
                                                - 33  -

-------
 2. Compliance with ARARs

 a. Groundwater Control and Remediation Options

 Ch. NR 140 is the major factor in determining compliance with ARARs. Alternatives C, D, E, and F all contain and
 control the further migration of contaminants into groundwater and ultimately reduce the contaminant
 concentrations in groundwater. Alternatives E and F actively restore the groundwater at the Chrome Shop. The
 remaining ARARs are met for all the alternatives with the possible exceptions of Alternatives E and F. Under
 Alternative E, injection of groundwater that may not meet NR 140 standards may be necessary to enhance the
 remediation in an effective manner. Therefore, this alternative may require a temporary exemption under NR
 140.28(5) if it is implemented. Under Alternative F, there would need to be a determination as to whether stabilized
 and/or solidified soil will prevent chromium from leaching in concentrations greater than NR 140 standards.

 b. Basement/Foundation Drain Exposure Mitigation Options

 Alternative BB has no ARARs associated with it. Alternatives BC and  BD may not meet ARARs for a discharge to
 the sanitary sewer, if the foundation drain water does not meet POTW pretreatment limits. The future
 characteristics of this water are unknown. Under alternative BE, the water from the foundation drain would be
 treated to meet POTW pretreatment standards prior to discharge to the sanitary sewer, so it would meet all ARARs.

 PRIMARY BALANCING CRITERIA - Alternatives which satisfy the two threshold criteria are then evaluated
 according to the five primary balancing criteria.

 3. Long-term Effectiveness and Permanence

 a. Groundwater Control and Remediation Options

 Alternatives C and D contain and remove for treatment the entire volume of contaminated groundwater over a very
 long period of time - more than 200 years.  Alternative E contains the plume and removes a majority of the
 contaminated groundwater but leaves some portion of the chromium at the Chrome Shop stabilized in-situ.
 Alternative F contains the plume at the Zinc Shop site and stabilizes the contamination at the Chrome Shop site.
 The residual chrome under Alternatives E and  F could represent a potential risk if the soil is ever excavated.

 b. Basement/Foundation Drain Exposure Mitigation Options

 Alternative BB has uncertain effectiveness because it relies on the residents to heed written warnings. There are no
 assurances that such warnings will be followed. Alternatives BC through BE provide physical barriers to the
 contamination, with BC providing the least reliable methods, while BE provides the greatest reliability.

 4. Reduction of Toxicity, Mobility or Volume through Treatment

 a. Groundwater Control and Remediation Options

Alternatives C, D, E, and F all offer a substantial reduction in mobility, toxicity, and volume through the removal
 and treatment of a majority of the dissolved subsurface contaminants. All of these alternatives include disposal of
 inorganic residuals at a licensed RCRA facility. All of these alternatives offer removal of VOCs from the
subsurface environment and treatment, disposal, or dispersion in the atmosphere, none of which reduces the toxicity
of these compounds.  Alternatives E and F include the immobilization of chrome within the subsurface thus
reducing both its toxicity and mobility.
                                                -  34  -

-------
 b.  Basement/Foundation Drain Exposure Mitigation Options

 Alternative BB provides no treatment. Alternatives BC through BE all provide some treatment of the contaminated
 foundation drain water though treatment at the POTW. Alternative BE provides additional treatment at the
 pretreatment facility prior to discharge to the POTW.

 5.  Short-term Effectiveness

 a.  Groundwater Control and Remediation Options

 Alternatives C and D require some mitigation of dust during construction of the proposed trench. Alternative E,
 with three trenches, also requires dust controls during construction. Alternative F, with 10,000 cubic yards of
 shallow soil mixing will require dust and VOC control during construction.  Institutional controls will be used with
 all alternatives except the no action alternative, to reduce risks associated with the recovery and treatment
 operations. Workers would be protected under all alternatives by following standard health and safety procedures.
 Alternative E will require some additional monitoring to ensure that recharge does not impact areas outside of the
 current plume boundaries. Alternative F will require bench scale testing to verify the effectiveness of the
 stabilization and/or solidification. The construction time for all alternatives is essentially equal, requiring only two
 to six months.

 The time to remediate the plumes is difficult to predict; however, Alternative F is expected to be the fastest for the
 Chrome Shop.  Alternative E would be fastest for the Zinc Shop and second quickest for the Chrome Shop.
 Alternatives C and D would probably require two to five times longer than Alternative E.  Even under the most
 optimistic case using Alternative E, the remediation may require as long  as 250 - 500 years. This results from the
 fact that the soils at the site are very impermeable and do not yield groundwater in sufficient quantities to remediate
 the aquifer in a shorter time frame. No technologies, short of digging up or stabilizing the impacted areas,  are
 available to speed the remediation appreciably.

 b.  Basement/Foundation Drain Exposure Mitigation Options

 Alternatives BB though BE can be implemented in a few months. Alternatives BD and BE have additional possible
 short-term risks to construction workers. These risks may be significantly reduced by following proper health and
 safety procedures and by restricting access to unauthorized persons during construction.

 6.  Ease of Implementation

 a. Groundwater Control and Remediation Options

 Alternatives C and D use proven technologies and disposal options. Alternatives E and F use innovative techniques
 to speed remediation and the feasibility and effectiveness would require testing prior to implementation.
 Administrative issues such as determining property ownership, obtaining deed restrictions, negotiating a discharge
 and operating agreement with the local POTW, and obtaining a disposal agreement with a licensed RCRA facility
 are common to all the alternatives. All these issues appear to be fairly simple to resolve, although access to these
 services cannot be guaranteed for the lengthy time frames over which they may be required.

b. Basement/Foundation Drain Exposure Mitigation Options

All the alternatives use standard, established construction methods.  Building access would have to be obtained from
the owners for alternatives BC through BE.
                                                 - 35  -

-------
 7.  Cost

 The costs for the groundwater alternatives are presented in Table 4.  The costs for the basement/foundation drain
 alternatives are presented in Table 5.

 8.  Agency Acceptance

 Both the Department of Natural Resources and U.S. Environmental Protection Agency agree with the selection of
 alternative F for the groundwater and alternative BE for the basement/foundation drain remediation. The heads of
 both agencies have signed this decision document.

 9.  Community Acceptance

 A Proposed Plan was prepared and released to the public on July 26, 1996. A 30 day public comment period was
 conducted between July 28, 1996 and August 26, 1996. A public hearing was held on the proposal on August 8,
 1996.  The substantive concerns of the public included: excluding interior frame walls and floor from the affected
 basements near the Zinc Shop; existence of "hot spots" of chrome contaminated soil near the Zinc Shop; the long
 time frame for groundwater cleanup at the Zinc Shop; impact on development potential for the Zinc Shop area; State
 and Federal experience in using stabilization/solidification for chromium contaminated groundwater;  the extent of
 chromium contaminated groundwater; affected private property owners near the Chrome Shop want assurance
 (through a clean closure certificate) that their property will be "clean" when groundwater treatment is complete;
 landscaping of property after stabilization/solidification; use of chemicals for in-situ treatment of chromium and
 residual effect on groundwater; monitoring of local residents for possible heath effects; possibility of the remedial
 activities causing health problems to local residents; effect of pumping sumps over the last 3 years on chromium
 concentrations in groundwater; and a time frame for removing monitoring wells from private property near the
 Superfund sites. See the responsiveness summary, attached to this decision summary, for additional information on
 community comments and the WDNR responses to comments.

 VIII.   THE SELECTED REMEDY

 Based upon consideration of the requirements of CERCLA, as amended by SARA, and the NCP, the detailed
 analysis of the alternatives and public comments, the Wisconsin Department of Natural Resources and U.S. EPA
 believe that alternative F, the selected remedy for groundwater, and alternative BE, the selected alternative for the
 basement/foundation drain remediation, are the most appropriate remedy for this site.  The selected remedy for the
 site includes the following:

 The contaminated groundwater at the Chrome Shop would be treated in-place by adding solid or liquid treatment
 chemicals that would stabilize the chromium. If necessary, the soil and groundwater would then be solidified by
 adding a cement-like substance. Stabilization and/or solidification should also address any other inorganic
 contaminants present at the site, in addition to chromium. A treatability study must be completed before using this
treatment technology.  Should the treatability study find that the alternative will achieve the enforcement standards
(ES), or a level between the ES and the PAL, an MR 140.28 exemption would be considered. The granting of a NR
 140.28 exemption would not require a revision to this decision document, but would be announced to the public,
with comments requested. Should the study find that the alternative will not achieve remediation goals,  then other
alternatives would be evaluated (a likely alternative in this  instance would be alternative C, with a reexamination of
contaminated groundwater conveyance options). Stabilization and/or solidification cannot be used at the Zinc Shop
because buildings, roads and utilities overlie the contaminated groundwater.  After treatment, groundwater
contamination should no longer exist at the Chrome Shop and the property can be put back into use.

The pretreatment building at the Chrome Shop would be removed and its equipment would be installed in a new


                                                -  36 -

-------
 building on the Zinc Shop property, eliminating the need to truck contaminated groundwater. The existing
 groundwater extraction system would continue to operate at the Zinc Shop.

 A deed restriction would be placed on the Zinc and Chrome Shop properties to prevent activities which could affect
 or disturb the effectiveness of the remedy, including future subsurface excavation and water well installation.
 Groundwater monitoring would be conducted semi-annually at both sites, but the frequency of this monitoring
 could be modified in the future.

 The basement walls and floors of two buildings near the Zinc Shop will be isolated from chromium seepage and
 foundation drains will be installed. If necessary, any additional soil contamination found near the Zinc Shop will be
 removed, treated and disposed of.

 The remedial action objectives and cleanup goals for the site are presented in Section VI of this Decision Summary.
 The remedial action objectives include:

 •      Prevent migration of contaminants in groundwater and in the long term, to remediate the groundwater to
        protect human health and the environment and to meet state and federal standards; and

 •      Prevent human exposure to contaminated soils and groundwater that pose unacceptable risks.

 In light of the site hydrogeologic conditions at the Zinc Shop, achievement of NR 140 Wis. Adm. Code standards
 may take a very extended period of time using currently existing technology. As a result, five (5) year reviews
 conducted pursuant to Sections 300.430 (f)(4)(ii) and 300.430 (f)(5)(iii)(C) of the NCP will assess whether newly
 developed technologies exist to achieve NR 140 Wis. Adm. Code standards in a significantly shorter time frame at
 the Zinc Shop. Should a review determine that it is not possible at that time to achieve the groundwater standards or
 to achieve further reductions at the Zinc Shop, then one of the options discussed  in Section IX. A., below, may be
 exercised. The granting of a NR 140.28 exemption would not necessarily require a revision to this decision
 document, but would be announced to the public, with comments requested.  A decision to invoke a technical
 impracticability waiver may require an amendment to this decision document.

 The WDNR and the U.S. EPA believe the selected remedy will achieve the remedial action objectives for the site.

 The estimated capital cost for this remedy is $1,363,100. Annual O&M cost estimate is $103,400.  The total present
 worth cost estimate for the selected alternative is $2,646,200,  based on operation over 30 years.

 IX. STATUTORY DETERMINATION

 A.      Protection of Human Health and the Environment

 The selected remedy provides adequate protection of human health and the environment through the
 implementation of the remedy components, including stabilization and/or solidification, groundwater extraction and
treatment, basement isolation and monitoring.  The remedy is expected to prevent persons from being exposed to
contaminated soil and groundwater and contaminants inside of homes. The remedy is expected to restore
groundwater quality to meet ch. NR 140 requirements and to minimize the movement of additional contaminants
 into groundwater at the Chrome Shop. The remedy is expected to contain and/or control contaminated
groundwater, and ultimately meet ch. NR 140 requirements at the Zinc Shop.

Given the nature of the selected remedy and the site hydrogeologic conditions at the Zinc Shop, achievement of NR
 140 Wis. Adm. Code standards and MCLs may take a very extended period of time at the Zinc Shop using  currently
existing technology. As a result,  five (5) year reviews conducted pursuant to Sections 300.430 (f)(4)(ii) and


                                               -  37  -

-------
 300.430 (f)(5)(iii)(C) of the NCP will assess whether newly developed technologies exist to achieve NR 140 Wis.
 Adm. Code standards in a significantly shorter time frame. Should a review determine that it is not possible at that
 time to achieve the groundwater standards or to achieve further reductions at the Zinc Shop, then one of the
 following options may be exercised:

        • Continue with the action without modifications and wait until the next review to reassess the situation;

        • Consider establishing an Alternative Concentration Limit under the substantive requirements of NR
        140.28 Wis. Adm. Code, which can be no higher than the ES;

        • Consider a technical impractibility waiver under Section 121(d) of CERCLA, which may be used to set
        an alternative groundwater goal higher than the ES or establish other approaches to groundwater
        containment or remediation that are protective of human health and the environment.

 The granting of a NR 140.28 exemption would not necessarily require a revision to this decision document, but
 would be announced to the public, with comments requested.  A decision to invoke a technical impracticability
 waiver may require an amendment to this decision document.

 B.      Attainment of ARARs

 The selected remedy will be designed to meet all applicable, or relevant and appropriate  requirements under federal
 and state environmental laws.  The primary ARARs that will be achieved by the selected alternative are:

 1.      Action Specific ARARs

 Resource Conservation and Recovery Act, as amended [42  U.S.C. Sec. 6901 et seq.], Subtitle C; Wisconsin
 Environmental Protection Law, Hazardous Waste Management Act [Wis. Stat. Sec. 144.60-74]

 Most RCRA Subtitle C (hazardous waste) requirements are administered under the State of Wisconsin's
 implementing regulations. Contaminated soil and groundwater and spoils from any construction and any other
 contaminated material or waste that is to be managed  as part of any remedy construction and operation shall be
 managed in accordance with applicable solid and/or hazardous waste requirements.

 The selected remedy will comply with the following requirements:

 Wis. Adm. Code NR 605; 40 CFR 261 - Identification of Hazardous Wastes. These regulations provide
 requirements for determining when a waste is hazardous. The substantive requirements of these regulations will
 apply to any on-site TCLP testing of residuals which may be disposed of off-site.

 Wis. Adm. Code NR 615; 40 CFR 262 - Standards Applicable to Generators of Hazardous Waste. These
regulations provide requirements for the shipment of wastes to treatment, storage or disposal facilities. These
 requirements may apply to on-site preparations for off-site shipment of treatment residuals and other wastes.

Wis. Adm. Code NR 620; Department of Transportation Hazardous Materials Transportation Act [49 U.S.C. Sec.
 1801];  40 CFR 263  - Standards Applicable to Transporters of Hazardous Waste. These statutes and regulations:
require record keeping, reporting and  manifesting of waste shipments.  These requirements may apply to on-site
preparations for off-site shipment of treatment residuals and other wastes.

Wis. Adm. Code NR 630.10-17; 40 CFR 264, Subpart B - General Facility Requirements. These regulations
establish substantive requirements for security, inspection, personnel training, and materials handling which are


                                                -  38  -

-------
 relevant and appropriate to on-site activities involving handling of hazardous materials. These requirements may
 apply to on-site preparations for off-site shipment of treatment residuals and other wastes.

 Wis. Adm. Code NR 630.21-22; 40 CFR 264, Subpart D - Contingency Plan and Emergency Procedures.  These
 regulations establish substantive requirements for emergency planning which are relevant and appropriate for on-
 site activities which may involve handling of hazardous substances.

 Wis. Adm. Code NR 675; 40 CFR 268 - Land Disposal Restrictions. These regulations require that hazardous
 wastes cannot be land disposed unless they satisfy specified treatment standards.  These regulations also impose
 record keeping requirements on such wastes. These requirements apply to on-site activities related to off-site
 disposal of any treatment residues or other hazardous wastes. Wis. Adm. Code NR 605; 40 CFR 261 - Identification
 of Hazardous Wastes. This code provides requirements for determining when a waste is hazardous. The substantive
 requirements of these regulations will apply to any on-site TCLP testing of residuals which may be disposed of off-
 site.

 Resource Conservation and Recovery Act, as amended [42 U.S.C. Sec. 6901 et seq.],  Subtitle D; Wisconsin
 Environmental Protection Law, Subchapter IV - Solid Waste [Wis. Stat. Sec. 144.43-47]

 Contaminated soil and groundwater and spoils from any construction and any other contaminated material or waste
 that is not a hazardous waste that is to be managed as part of any remedy construction and operation shall be
 managed in accordance with applicable ch.  NR 500, WAC series solid waste requirements.  It may be possible to
 dispose of such material or waste in a solid  waste landfill facility, provided that facility is approved by the WDNR
 to accept such material or waste. Hauling companies licensed by WDNR to transport solid waste would be used to
 take such waste or material to the approved solid waste facility.

 Occupational Safety and Health Administration (OSHA) - Regulates worker safety.

 Clean Water Act of 1977, as amended [33 U.S.C. Sec. 1317]

 Wis. Adm. Code 108 and 211; 40 CFR 403  - Pretreatment Standards -  These regulations  prohibit discharges to
 POTWs which pass through or interfere with the operation or performance of the POTW. The requirements of these
 regulations apply to the groundwater which is collected and discharged to the City of DePere POTW.

 2.      Chemical Specific ARARs

 Safe Drinking Water Act [40 U.S.C. Sec. 300 et  seq.]

 Wis. Adm. Code NR 109; 40 CFR 141 - Maximum Contaminant Levels (MCLs) - MCLs  establish drinking water
 standards for potential and actual drinking water sources. The selected remedy is intended to achieve compliance
with MCLs and non-zero Maximum Contaminant Level Goals.

Wis. Adm. Code NR 140 - Groundwater Quality Standards - This code provides for groundwater quality standards
including Preventive Action Limits (PALs), Enforcement Standards (ESs) and (Wisconsin) Alternative
Concentration Limits (WACLs). The selected remedy is intended to achieve compliance with PALs at and beyond
the point of standards application. To the extent the Department subsequently determines that it is not technically or
economically feasible to achieve PALs, NR 140.28 provides substantive standards for granting exemptions from the
requirement to achieve PALs.  Such exemption levels may not be higher than the ESs, for the compounds of
concern at this site.

In light of the site hydrogeologic conditions at the Zinc Shop, achievement of NR 140 Wis. Adm. Code standards


                                               - 39  -

-------
may take a very extended period of time using currently existing technology.  As a result, five (5) year reviews
conducted pursuant to Sections 300.430 (f)(4)(ii) and 300.430 (f)(5)(iii)(C) of the NCP will assess whether newly
developed technologies exist to achieve NR 140 Wis. Adm. Code standards in a significantly shorter time frame at
the Zinc Shop.  Should a review determine that it is not possible at that time to achieve the groundwater standards or
to achieve further reductions at the Zinc Shop, then one of the options discussed in Section IX.A., above, may be
exercised. The granting of a NR 140.28 exemption would not necessarily require a revision to this decision
document, but would be announced to the public, with comments requested.   A decision to invoke a technical
impracticability waiver may require an amendment to this decision document.

C.      Cost Effectiveness

The selected remedy provides for overall  cost effectiveness. It has a total present worth cost that is similar to some
of the other alternatives evaluated, but provides the most protection and effectiveness in the least amount of time of
all the alternatives.

D.      Use of Permanent Solutions and  Alternative Treatment Technologies

The selected alternative utilizes a permanent and alternative treatment technology, in-situ stabilization and/or
solidification.  The existing collection sump and new external foundation drains at the Zinc Shop and residences
will reduce the amount of contaminants in the groundwater over time.

E.      Preference for Treatment as a Principal Element

By treating the contaminated soil in place at the Chrome shop and treating extracted groundwater at the Zinc Shop
prior to discharge to the POTW, the remedy satisfies the statutory preference for remedies that employ treatment of
the principal contaminant threat to permanently and significantly reduce toxicity, mobility  or volume through
treatment.
                                                -  40  -

-------
                                    RESPONSIVENESS SUMMARY

 This Responsiveness Summary has been prepared to meet the requirements of Sections 113 (k) (2) (B) (iv) and
 117(b) of the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA), as
 amended by the Superfund Amendments and Reauthorization Act of 1986 (SARA), which requires the United
 States Environmental Protection Agency (EPA) or the state, for state lead sites, to respond "... to each of the
 significant comments, criticisms, and new data submitted in written or oral presentations" on a proposed plan or
 draft Record of Decision for the remedial action. The Responsiveness Summary addresses concerns by the public
 and potentially responsible parties (PRPs) in written and oral comments received by the state regarding the proposed
 remedy at the Better Brite site.

 A.      Proposed Plan (PP) and Public Comment Period

 The Proposed Plan for the site was made available for public comment in July, 1996. A public meeting to explain
 the Proposed Plan, and to receive public comments was held on August 8,  1996. All comments which were
 received by the Department prior to the end of the public comment period, including those expressed verbally at the
 public meeting, were considered in making the final decision and are addressed in this Responsiveness Summary.

 B.      Community Interest

 Interest by residents near the site is high.

 C.      Summary of Significant Public Comments

 Comments received during the public comment period are summarized below. Some of the comments are
 paraphrased to effectively summarize them in this document.

 Comment: Alternative BE in the Proposed Plan includes constructing interior wood frame walls with sheet
 rock and a plywood floor in two affected basements near the Zinc Shop. The wood frame walls would restrict
 access to and monitoring of the basement foundation for chromium infiltration.  In addition, the basements
 have a history of flooding and the wood walls/floors would exacerbate cleanup efforts if future flooding
 occurs. Finally, the basement in the home at 401 S. 6th Street is quite small and would be even more
 restricted in space if interior walls were built.

 Response: Due to the above comments, the Agency has chosen to eliminate construction of interior walls  and floors
 from the chosen basement/foundation dram mitigation option, Alternative BE.

 Comment: The owner of the property at 548 Butler Street believes chrome contaminated soil exists  on his
 property east of the Zinc Shop.

 Response:  Soil testing off the Zinc Shop property was not conducted in 1993 during the soil removal action.
 Therefore, this ROD proposes that additional soil testing be conducted on properties surrounding the Zinc  Shop.  If
 contaminated soil is discovered, it will be excavated and properly treated and disposed.

 Comment: What kind of time frame can be expected for cleanup at the off-site areas at the Ziric Shop?

Response: We estimate that the cleanup time will be greater than 200 years. One flushing of contaminated
groundwater at the Zinc Shop is estimated to take 50 years and several flushings will be necessary to reduce
chromium levels to State groundwater standards.  It is very difficult to accurately estimate the cleanup tune in the
tight clay soils that exist at the Zinc Shop.


                                               -  1  -

-------
 Comment:  The continuing contamination at the Zinc Shop will have some impact on the salability of affected
 off-site areas near the Zinc Shop.

 Response: This may well be the case. City water is provided to the entire area. The only real limitation on use of
 off site properties within the groundwater contamination zone is that foundation drains need to be provided for
 basements below the water table.

 Comment:  What is the success rate for stabilization and/or solidification? Does it totally cleanup the
 contamination?

 Response: The use of stabilization and/or solidification  is very site specific. Treatability testing will be done before
 the technology is designed for the Chrome Shop to ensure the most effective treatment occurs. Only after the
 treatability tests will we be able to determine "how clean" the groundwater and soils will be after treatment. We
 have not used this technology to treat chromium in the State of Wisconsin. We have used stabilization/solidification
 successfully on other types of contaminants and chromium has been successfully treated in other states.

 Comment:  How does the WDNR know the western extent of groundwater contamination at the Chrome
 Shop?

 Response: We know the extent of contamination lies between well nests 109 and 110. In addition, a bedrock divide
 and a storm water drain runs between these two well locations and we believe the divide and storm water drain are
 defining the  western extent of groundwater contamination at this time.

 Comment:  Will off-site property owners at the Chrome Shop be given a document saying their land is clean
 and no one in the future has to do any additional cleanup?

 Response: The WDNR does give "clean closure letters"  to property owners where contamination has been cleaned
 to applicable standards. Such a letter could be given to the landowners where the stabilization and/or solidification
 will be performed. We will be confirming that  the groundwater has been cleaned up by groundwater monitoring
 after treatment.

 Comment:  Will the property that is treated at the Chrome Shop be landscaped after treatment?

 Response: The property at the Chrome Shop as well as off-site property that is affected by the treatment process
 will be re-landscaped to ensure useability and aesthetics  of the land.

 Comment:  It seems strange that you have to use chemicals to get rid of chemicals.

 Response: One of the important aspects of the  treatability study is to find suitable treatment chemicals that won't
 cause harm to the environment. Usually a chemical called ferrous sulfate is used to change the chromium from the
toxic hexavalent type to the non-toxic trivalent kind. In the  treatment process, the ferrous iron is changed to ferric
 iron, which holds tightly to the soil particles and doesn't migrate in the groundwater. Neither ferrous nor ferric iron
 is toxic. Likewise, sulfate is not toxic.

Comment:  Is there any provision for residents near the Better Brite sites that get  sick and need long-term
care?

Response: There are no provisions for such care.  Rather, the Division of Health works hard to ensure that residents
are not exposed to conditions that cause ill health effects. Advise is given to residents (such as those with chromium
exposure in their basement) on how to reduce their exposure. In addition, our proposed course of action should


                                                 -  2  -

-------
eliminate exposure for those residents.

Comment: Is there a possibility that remedial activities will cause ill health effects for local residents?

Response: The treatment process at the Chrome Shop provides for protection of workers and residents by using a
volatile hood to control dust and emissions. Any excavation of contaminated soil at the Zinc Shop will provide for
dust control, which is the main concern for chromium contaminated soil.

Comment: Is the groundwater showing a decrease of toxicity now?

Response: The large sumps have been operating at the Zinc and Chrome Shops for approximately 3 years. Because
groundwater travels so slowly in these clay soils, we would not expect to see reduced chromium concentrations in
the groundwater monitoring wells near the sites. We have only collected the water closest to the sumps, which is the
most contaminated groundwater. Toxicity has been reduced by removing this water, but the reduction is likely not
demonstrated  in the groundwater monitoring wells.

Comment: When will the monitoring wells that are currently located on private property be removed?

Response: The WDNR's consultant is evaluating which wells can be removed and which need to be retained for
future monitoring. We know that it can be an inconvenience to have the wells on private property, as well as raise
red flags for potential buyers.
                                                - 3  -

-------
                                                   TABLE 1
         SUMMARY OF CONFIRMED NR 140 GROUND WATER ENFORCEMENT STANDARD EXCEED ANCES
                                         BETTER BRITE CHROME SHOP
CONSTITUENTS
DATE
Chromium
Manganese*
ES

100
50
PAL

10
25
Chrome Sump
8/94
694,000

10/94
297,000

French Drain
8/94
22,000
123
10/94
31,700
197
MW-108
8/94

55.9
10/94

67.1
MW-108 A
8/94

55.0
10/94

132
VOCS
1,1,1 -Trichloroethane
Tetrachloroethene
Trichloroethene
200
5
5
40
0.5
0.5
1,100
59
59
950
22
39


















CONSTITUENTS
DATE
Chromium
Manganese*
ES

100
50
PAL

10
25
MW-109
8/94
9,570

10/94
1,980

MW-110
8/94

64.3
10/94

126
MW-113
8/94

191
10/94

391
5/95

545
* = Public Welfare Standard
Units are in ug/1 (ppb)
Blank spaces = ES not exceeded
NOTE: This table summarizes all NR 140, WI Adm. Code, Enforcement Standard Exceedances that were detected in two rounds of
sampling. Enforcement Standards were exceeded in one sampling round (but not confirmed) for: Antimony; Arsenic; Beryllium;
Cadmium; Silver; Thallium; 1,1-Dichloroethene; 1,1,1-Trichloroethane; Carbon Tetrachloride; 1,2-Dichloroethane; and 1,1,2-
Trichloroethane.

-------
                                           TABLE 1 (p. 2 )
        SUMMARY OF CONFIRMED NR 140 GROUNDWATER ENFORCEMENT STANDARD EXCEEDANCES
                                      BETTER BR1TE ZINC SHOP
CONSTITUENTS
DATE
Chromium
Manganese*
ES

100
50
PAL

10
25
MW-4
8/94

387
10/94

160
MW-4A
8/94

255
10/94

258
MW-4B
8/94

103
10/94

86.1
MW-5
8/94
827

10/94
299

CONSTITUENTS
DATE
Chromium
Nickel
Manganese*
ES

100
100
50
PAL

10
20
25
MW-6
8/94
39,000

63.6
10/94
41,900

59.8
MW-7
8/94


103
10/94


55.8
MW-9
8/94
697


10/94
442


MW-10
8/94
53,100
146

10/94
43,500
137

CONSTITUENTS
DATE
Chromium
Iron*
Manganese*
Cyanide
ES

100
300
50
200
PAL

10
150
25
40
MW-12
3/95


84.5

5/95


77.4

MW-13
3/95

732
764

5/95

6,240
1,250

Zinc Sump
8/94
209,000


939
10/94
277,000


570
* = Public Welfare Standard