PB96-964202
                                EPA/ROD/R06-96/100
                                March 1997
EPA Superfund
      Record of Decision:
       Longhorn Army Ammunition Plant,
       (No Further Action at LHAAP 13 and 14)
       Karnack, TX
       2/14/1996

-------

-------
  RECORD OF DECISION
         FOR
  NO FURTHER ACTION
         AT
    LHAAP13AND14
      LONGHORN
ARMY AMMUNITION PLANT

    KARNACK, TEXAS
    FEBRUARY 1996

-------

-------
                               LHAAP 13 AND 14
                    LONGHORN ARMY AMMUNITION PLANT
                             RECORD OF DECISION

                             NO FURTHER ACTION

                                FEBRUARY 1996
A.  SITE NAME AND LOCATION

LHAAP 13 and 14, Longhorn Army Ammunition Plant
Karnack, Texas
B. STATEMENT OF BASIS AND PURPOSE
This decision document presents the selected No Further Action alternative for LHAAP 13 and
14, Longhom Army Ammunition Plant (LHAAP), in Karnack, Texas.  This selection is made in
accordance with the Comprehensive Environmental Response, Compensation, and Liability Act
of 1980 (CERCLA), as amended by the Superfund Amendments and Reauthorization Act of 1986
(SARA) and, to the  extent practicable, the National Oil and Hazardous Substances Pollution
Contingency Plan (NCP). This decision is based on the administrative record for this site.

The State of Texas  concurs  with the selected remedy.  A copy of the concurrence letter is
attached.
C. ASSESSMENT OF THE SITES

There are no actual or threatened releases of hazardous substances as a result of suspected previous
activities from these sites that may present an imminent and substantial endangerment to public
health, welfare, or the environment.
D.  DESCRIPTION OF THE SELECTED REMEDY
The Record of Decision for the sites addresses No Further Action.

-------
E.  STATUTORY DETERMINATION

Based on previous studies and surveys, no remedial action is warranted to protect human health
and the environment at LHAAP 13 and LHAAP 14.  This decision complies with Federal and
State applicable or relevant and appropriate requirements and is cost effective.

There will be no further action at LHAAP 13 and LHAAP 14.
Jane w. Saginaw
Regio^aj/Admin:
EPA Region 6
Date

-------
Signature sheet for the foregoing LHAAP 13 and 14 No Further Action Record of Decision
between the Department of the Army and the U.S. Environmental Protection Agency,  with
concurrence by the Texas Natural Resource Conservation Commission.


                                                                /(
                          _
Mr. #unes A. McPherson                                         Date
Commander's Representative,
   Louisiana and Longhorn
   Army Ammunition Plants
Darrell Chinn                                                   Date
Captain, U.S. Army
Executive Officer
Longhorn Army Ammunition Plant

-------

-------
           Record of Decision
            No Further Action
         Sites LHAAP 13 and 14
     Longhorn Army Ammunition Plant
            Lisa Marie Price
            ROD Peer Review
           Gustavo Ghavarria
  Superfund Texas Section Chief (6SF-AT)
         " Willfam K. Honker
AK/OK/TX Superfund Branch Chief (6FS-A)
            Michael C. Barra
Litigation and Enforcement Branch (6SF-DL)
              Mark Peyckjb
Litigation and Enforcement Branch (6SF-DL)
           Myron O. Knudson
     Superfund Division Director (6SF)

-------

-------
                              TABLE OF CONTENTS


A.  Location and Description	1

B.  Site History and Enforcement Activities	6

C.  Highlights of Community Participation	7

D.  Summary of Site Characteristics	7

F.  Summary of Site Risks	8

G.  Summary of The Comparative Analysis of Alternatives 	10
       1.  Overall Protection of Public Health and the Environment	10
       2.  Compliance with ARARs	10
       3.  Long-term Effectiveness or Permanence	10
       4.  Reduction of Toxicity, Mobility, or Volume of Contaminants	11
       5.  Short-term Effectiveness   	11
       6.  Implementability  	11
       7.  Cost  	11
       8.  State Acceptance  	11
       9.  Community Acceptance	11

I.  Selected Remedy	12

J.  Statutory Determination	12
APPENDIX A, The State of Texas, Letter of Concurrence                            A-l
APPENDIX B, Responsiveness Summary                                           B-l
APPENDIX C, Index of Administrative Record                                      C-l

-------

-------
 DECISION SUMMARY

 A. Location and Description

 Longhorn Army Ammunition Plant (LHAAP) is located in central east Texas in the northeast
 corner  of Harrison County,  approximately  14 miles northeast of Marshall,  Texas,  and
 approximately 40 miles west of Shreveport, Louisiana (Figure 1). The installation occupies 8,493
 acres between State Highway 43 and the western shore of Caddo Lake and is accessed by State
 Highways 43 and 134.  LHAAP 13 and LHAAP 14 are located in the south-central portion of
 LHAAP (Figure 2).

 LHAAP 13 encompasses approximately l/2 acre and is located in a clearing 130 feet north of
 Avenue Q.   The site  is an open  area of grass bounded by heavy timber.  LHAAP 14 is
 approximately 150 feet by 115 feet and is located approximately 330 feet southwest of the Retail
 Sales Area and 350 feet north-northwest of Building 49-W.  The area contains a small 25 feet by
 30 feet asphalt parking lot serving four or five vehicles. LHAAP 14 is bounded on the north by
 Avenue Q, on the east by the access road to Building 49-W, and on the south and west by a
 mowed grass strip separating it from heaw forest.

 LHAAP is situated on gently rolling land with an average slope of 3 percent towards the northeast.
 Most of the terrain slopes 3 percent or less, but slopes as steep as 12 percent are common in the
western and northwestern portions of the installation and along the Harrison Bayou floodplain.
Elevations on LHAAP vary from 335 to 170 feet above mean sea level (msl).

LHAAP 13 is situated on a topographic high between the Harrison Bayou and the Central Creek
drainage basins.  The site is relatively flat with no ditches or surface drainage channels in the
immediate vicinity to divert runoff.  A good stand of vegetation surrounding the site inhibits any
erosion of surface soils at the site.

 LHAAP 14 topography is essentially flat with little or no  surface drainage.  Limited drainage
existing at the site is toward the east in a ditch running along Avenue Q and eventually discharging
 into Harrison Bayou.

 LHAAP is located in a region commonly called the Pineywoods, a deep inland extension of the
 Gulf Coastal Plain that extends into Texas, Louisiana, Arkansas, and Oklahoma.  The area is
 characterized by mixed pine hardwood forests that cover gently rolling to hilly terrain.  Mild
 temperatures and ample rainfall in east Texas provide excellent conditions to support an abundant
 and diverse plant community. This, in turn, provides a number of niches for a rich faunal

-------
                                                DALLAS   MARSHALL
       NO SCALE
                 FIGURE 1
LONGHORN ARMY  AMMUNITION PLANT  AREA MAP
              KARNACK, TEXAS

-------
                   ELEVATED
                   WATER
                 STORAGE
                  AREA
                  FIGURE 2   LOCATION MAP FOR LHAAP 13 & LHAAP 14
                                SCALE IN FEET
                   4000'  2000'  0         4000'
8000'
RBP/I6DEC94/LHJEPI-2.DGN

-------
 community. LHAAP is forested with loblolly and shortleaf pines, a variety of oaks, sweet gum,
 black tupelo, ash, bald cypress, and a few scattered willows. Pine trees predominate throughout
 the installation.  Both LHAAP 13 and 14 are cleared areas within a heavily wooded section of
 LHAAP.

 Caddo Lake,  Caddo Lake State Park, and the small unincorporated town of Karnack border
 LHAAP. Other surrounding land is forested, with an oil and natural gas field located to the east
 of LHAAP along the Louisiana border.  Caddo Lake State Park is located approximately 2.8  miles
 west-northwest of the installation.  Other recreational facilities and nearby lake shore communities
 are within 5 miles.  The town of Uncertain is 1.9 miles north of LHAAP.

 All surface water from LHAAP drains into Caddo Lake via four drainage  systems that  cross
 portions of the installation (Figure 3).  These systems are known as Saunders Branch, Harrison
 Bayou, Central Creek,  and Goose Prairie Bayou.

 The surface drainage at the LHAAP 13 is very limited.  No water bodies or water courses run
 through the site.  The site is relatively remote, with no signs of significant erosion or obvious
 signs of water leaching into nearby  tributaries, and is not expected to be developed as a drainage
 way or for surface water use.

 The surface drainage at the LHAAP 14 flows to the east. Runoff from the site may collect in the
 drainage ditch along Avenue Q and eventually flow into Harrison Bayou and then Caddo Lake.
 Erosion of surface soils during heavy rainfall could produce sediment that would be carried by
 surface water runoff into the collection ditch along Avenue Q where it could be deposited  or be
 carried into Harrison Bayou. However, a good stand of vegetation at the site,  as well as asphalt
pavement, retains the soil and minimizes erosion by water or wind.

 LHAAP, including  LHAAP 13 and 14, is situated on an outcrop of the Wilcox Group, which
 crops out over a large part of the eastern half of Harrison County. "TV. Wilcox consists mostly
 of fine- to medium-grained sands interbedded with a considerable amount of clay and seams of
 lignite.  The Wilcox Group is underlain conformably by the predominantly calcareous clay of the
 Midway Group.  Regional dip of the Wilcox is to the northwest into the East Texas Syncline,
 while the ground surface generally dips to the southeast.

 The Wilcox Group has been identified by the Texas Water Development Board as the basal unit
 of the regional  Cypress aquifer, also known as the Carrizo-Wilcox aquifer.  The Cypress aquifer
 outcrops over most of Harrison County and is comprised  of, in ascending order, the Wilcox
 Group, the Carrizo Sand, the Reklaw Formation, and the Queen City Sand.  All units are believed
 to be hydraulically connected.  All of these units dip  to  the northwest into  the East Texas
 Syncline. At LHAAP, only the Wilcox Group of the Cypress aquifer is present.

 The availability of ground water in Harrison County is largely dependent on the hydrologic
 characteristics of the units comprising the Cypress aquifer.  The Wilcox Group outcropping  in the

-------
    U.S.  ARMY CORPS OF ENGINEERS
          TULSA DISTRICT

 LONGHORN ARMY AMMUNITION PLANT
         KARNACK, TEXAS


    DRAINAGE  MAP
 Date:  OCT  1994
                   Figure:  3
           SCALE IN FEET
   2000' 1000'  0      2000'
     I  I—J  I—I       I—
4000'
/ utxwa.acu i !!Xr.<

-------
 area of LHAAP yieMs small (less than 50 gallons per minute (gpm) to moderate (50-500 gpm)
 quantities of fresh water to wells throughout the county. As the basal unit of the Cypress aquifer,
 the Wilcox is also considered as the base of fresh water in the area. The Midway Group, which
 does not yield usable quantities of water, tends to serve as a relatively impermeable basement to
 the overlying water-bearing Wilcox.

 B. Site History and Enforcement Activities

 Longhorn Army Ammunition Plant is a government-owned, contractor-operated (Longhorn
 Division of Thiokol Corporation) industrial facility under the jurisdiction of the U.S. Army
 Armaments, Munitions, and Chemical Command. Its primary mission is to load, assemble, and
 pack pyrotechnic and illuminating/signal ammunition and solid propellant rocket motors.

 Longhorn Army Ammunition Plant was established in October 1942 with the primary mission of
 producing trinitrotoluene (TNT) flake in the Plant 1 area.  Production of TNT continued through
 World War II until August 1945 when the plant went on standby status until February 1952.
 Pyrotechnic ammunition, such as photoflash bombs,  simulators, hand signals, and tracers  for
 40mm ammunition were manufactured ^ LHAAP from  1952 until 1956. The Plant 3 area rocket
 motor facility began operation in November of 1955.  Production of rocket motors continued to
be the  primary mission of LHAAP until  1965,  when the production of pyrotechnic and
 illuminating ammunition was re-established.

 Recent  operations  consist of compounding  pyrotechnic and propellant mixtures;  loading,
assembling and packing activities; accommodating receipt and shipment of containerized cargo;
 and maintenance and/or layaway of standby facilities and equipment as they apply to mobilization
planning.  The installation has also been responsible for the static firing and elimination of
 Pershing I and II rocket motors in compliance with the Intermediate-Range Nuclear Force Treaty
 in effect between the United States and the former Soviet Union.

Based on a records search by USAEHA, a one-time disposal of TNT or waste acid was suspected
 to have occurred at LHAAP 13. Other than this suspect incident, no other waste disposal activities
 have taken place at the site.

 The Area 54 Burial Ground, LHAAP 14, was suspected of having demolition debris, building
 rubble, explosives, and acidic wastes disposed during the 1940's and early 1950's.  The disposal
 site is reportedly beneath the asphalt parking area adjacent to Building 49-W.  Other than  this
 period of operation, no other waste activities have taken place at  the site.
As part of the U.S. Army Installation Restoration Program, the LHAAP began an environmental
investigation of current and previously used waste disposal sites in 1976.  The LHAAP installation
was added to the National Priorities List (NPL) on August 30, 1990 (54 Federal Register 35509).
After being listed on the NPL, The U.S. Army, U.S. Environmental Protection Agency (EPA),

-------
 and Texas Natural Resource Conservation Commission (TNRCC) - formerly known as the Texas
 Water  Commission  (TWC)  -  entered  into  a  Comprehensive  Environmental Response
 Compensation, and Liability Act (CERCLA) Section 120 Agreement for remedial activities at the
 facility. The CERCLA Section 120 Agreement, referred to as the Federal Facility Agreement
 (FFA), became effective on December 30, 1991.
 C. Highlights of Community Participation

 The U.S. Army, EPA, and TNRCC have provided public outreach to the community surrounding
 LHAAP concerning the LHAAP 13 and 14 and other sites on the facility.  The outreach program
 has included fact sheets, media interviews, site visits, invitations to attend quarterly technical and
 regulatory review meetings, and public meetings.

 Copies of the Administrative Record documents have been made available to the public at several
 information repository locations, including LHAAP, EPA Region VI Library, TNRCC, and
 Marshall Public Library.  On August 1, 1995, the Administrative Record at LHAAP was moved
 to the Karnack High School Library to facilitate and encourage public review.  Notice of this
 change was published in the Marshall Messenger. The Proposed Plan for No Further Action was
 released to the public on July 7, 1995. Copies of the Proposed Plan were placed at the Karnack
 Post Office, Marshall Library, Uncertain City Hall, and LHAAP.  In addition, copies of the
Proposed Plan were sent to members of the community that have shown interest in activities at
LHAAP and attended other public meetings. Approximately 1,500 Fact Sheets identifying the
sites under review, the preferred alternative, and the date of the public meeting were mailed to
people living near LHAAP.  Notice of the public meeting was also published in the Marshall
Messenger. A public comment period was designated from July 7, 1995, to August 6,1995, and
a public meeting was held on July 18,  1995, at the Karnack High School. The purpose of the
meeting was to discuss the proposed plan and to solicit public comments on the No Further Action
alternative for LHAAP 13 and 14.

 Representatives of the U.S. Army and TNRCC answered several questions at the public meeting.
 No written comments were received during the public comment period.  Comments expressed at
 the public meeting are addressed in the Responsiveness Summary which is attached to the Record
 of Decision (ROD) as Appendix B.

 D. Summary of Site Characteristics

 Soils in the area consist predominantly of medium plasticity clays with some high plasticity zones
 (CL, CH) from the surface to a depth of 4 to 10 feet. Below the surface stratum, and extending
 to the total depth investigated of 35 feet, the soils are typically low plasticity clays (CL) or silty,
 clayey sands (SC, SM-SC). This stratum is distinguished from the surface stratum by typically
 being much sandier and less plastic; however, it does contain some medium to high plasticity clay
 zones.

-------
 There does not appear to be any layering of soils in the lower stratum. These materials are typical
 of the Wilcox Group.

 Ground water at both sites generally occurs under unconfmed conditions. The elevation of the
 ground water at both sites fluctuates with seasonal variations in rainfall.  The ground water  is
 encountered at depths of 7 to 8 feet below ground surface.

 LHAAP 13 was first reported by the U.S. Army Environmental Hygiene Agency (AEHA) in
 1987.  The site was identified through review of aerial photographs showing changes in the site
 topography. LHAAP 14 was first reported by AEHA in 1980.  Since then, several investigations
 have been performed and reports generated regarding LHAAP 13 and 14. Investigation results
 are provided in the Administrative Record.

 Soil and water samples were taken at LHAAP 13 and 14 and analyzed for volatile organics, semi-
 volatile organics, explosives, metals (arsenic, barium, chromium, mercury, nickel, lead, selenium,
 and thallium), and anions. Nothing was detected at LHAAP 13, except metals, in the soil or
 groundwater.  All metals in the soil and groundwater investigations at LHAAP 13  were below
 LHAAP background levels, established in the LHAAP Background Concentration Reports, June
 1995, except for barium, selenium, and mercury in the soil. Although these constituents slightly
 exceeded established background levels,  they occur naturally and are  not indicative  of soil
 contamination.

 No contaminants were detected in the groundwater at LHAAP 14 except for some metals and
anions.   All metals in the  groundwater investigation  at LHAAP 14  were below LHAAP
background levels except for chromium and nickel.   Nitrate-nitrite was the only anion detected.
Although the constituents slightly exceeded established background levels, they occur naturally
and are not indicative of soil contamination.

Nc contaminants were detected in the soil at LHAAP 14 except for tr?   unounts of toluene, butyl
benzyl phthalate and a few metals. All metals were below background levels, occur naturally and
 are not indicative of soil contamination.  Butyl benzyl phthalate is a common plastic additive and
 is most likely a field contaminant resulting from the interaction of decontamination fluids with plastic
 gloves on the workers (leaching out the phthalate).  Toluene is only found as a trace contaminant in
 one sample.

 F.  Summary of Site Risks

 An evaluation of potential risks to human health and the environment from any site contaminants was
 conducted as part of a risk analysis. The Risk Analysis for Sites 13 and 14  is presented as part of
 the RI/FS and  is available in the Administrative Record. A summary of the findings follows.

-------
 CURRENT AND FUTURE HEALTH RISKS

 A human health risk analysis is a procedure which uses a combination of facts and assumptions to
 estimate the potential for adverse effects on human health from exposure to contaminants found at
 a particular site.  Risks are determined by evaluating known chemical exposure limits and actual
 chemical concentrations at the site.  The actual concentrations are compared to the exposure to a
 concentration known to have an adverse impact.  Carcinogenic risks are expressed in terms of the
 chance of developing cancer after a lifetime of exposure to the contaminants.  Non-carcinogenic risks
 are based on exposures to concentrations of contaminants greater than concentrations known to have
 an adverse lifetime non-cancerous impact. Conservative assumptions are used in calculation risks that
 weigh in favor of protecting human health.

 The national risk, or probability, that an individual may develop some form of cancer from everyday
 sources, over a 70-year life  span, is estimated at one-in-four.  This one-in-four probability is
 considered the "natural incidence" of cancer in the United States. To protect human health, the EPA
 has set the range from one in ten thousand to one in one million (expressed as IxlO"4 to IxlOr6)
 lifetime excess cancer incidents as the remedial goal for Superfund sites.  A risk of one in one million
 means that one person out of one million people could develop cancer as  a result of a lifetime
 exposure to the site contaminants.

The level of concern for non-carcinogenic contaminants is determined by calculating a hazard index.
If the hazard index exceeds one (1), there may be concern for potential non-cancer effects for lifetime
 exposure to the site contaminants.

The site-specific risk assessment process begins by evaluating the current site risk, also called the
 baseline risk, posed to human health.
Chemicals of Concern (Site Related Contaminants)

An initial step  in selection of chemicals of potential  concern is comparison of site data with
background  concentrations.  Comparison of all Site 13  metals data from surface  soils with
background concentrations indicate that all metals in surface soils at the site approximate naturally-
occurring levels. Concentrations of the two metals detected in groundwater (barium and selenium)
are below background concentrations and are at or below established Maximum Contaminant Levels
(MCLs) for these metals. These data, combined with extreme distances to potential human receptors
for groundwater, do not justify selection of any chemicals of potential concern at Site 13.

Risk Analysis

Based on an analysis of site data, no findings of chemicals of concern, and criteria for performing a
risk analysis, it  was concluded that the site does not pose an unacceptable risk to human health.

-------
 Ecological Risk Assessment

 Based on previous findings in the risk analysis for human health, it was determined that the site does
 not pose an unacceptable risk to ecological receptors.
LHAAP 14

Chemicals of Concern

Comparison of Site 14 metals data from surface soils with background concentrations indicates that
all metals in surface soils at the site approximate naturally-occurring levels.   The concentration of
the one detected metal in groundwater (barium) most likely approximates background concentrations
and is at or below established MCLs for this metal.  The concentration of phthalates could be a result
of field contamination due to sampling procedures. Toluene is found in a trace amount. These data,
combined with extreme distances to  potential human receptors for groundwater,  do not justify
selection of any chemicals of concern at Site 14.

Risk Analysis

Based on an analysis of site data, no findings of chemicals of concern, and criteria for performing a
risk analysis, it was concluded that the site does not pose an unacceptable risk to human health.

Ecological Risk Assessment

Based on previous findings in the risk analysis for human health, it was determined that the site does
not pose an unacceptable risk to ecological receptors.
G. Summary of The Comparative Analysis of Alternatives

CERCLA regulations require that remedial  alternatives be evaluated against nine criteria to
determine which alternative(s) provide the best balance between the criteria and, therefore, should
be implemented at the site.  The following presents an explanation of the criteria:

1. Overall Protection of Public Health and the Environment
This criteria addresses the way in which a potential remedy would reduce, eliminate, or control the risks posed by the
site to human health and the environment. The methods used to achieve an adequate level of protection may be through
engineering controls, treatment, techniques, or other controls such as restrictions on the future use of the site.

2. Compliance with ARARs
Compliance with applicable or relevant and appropriate requirements (ARARs) assures that a selected remedy will meet
all related Federal, State, and local requirements. The requirements may specify maximum concentrations of chemicals
that can remain at a site; design or performance requirements for treatment technologies; and restrictions that may limit
potential remedial activities at a site because of its location.


                                              10

-------
 3.  Long-term Effectiveness or Permanence
 This criteria addresses the ability of a potential option to reliably protect human health and the environment over time,
 after the cleanup goals have been accomplished.

 4.  Reduction of Toxicity, Mobility, or Volume of Contaminants
 This criteria assesses how effectively a proposed remedy will address the contamination problem. Factors considered
 include: the nature of the treatment process; the amount of hazardous materials that will be destroyed by the treatment
 process; how effectively the process reduces the toxicity, mobility, and volume of waste; and the type and quantity of
 contamination that will remain after treatment.

 5.  Short-term Effectiveness
 This criteria assesses short-term risks to the workers, the community, and the time factor.  Cleanup technologies often
 require several years for implementation.   A potential remedy is evaluated for the length of time required  for
 implementation and the potential impact on human health and the environment during the remedial action.

 6. Implementability
 Implementability addresses the ease with which a potential remedy can be put in place.  Factors such as technical
 feasibility and availability of materials and services are considered.

 7. Cost
 Costs (including estimated capital costs required for design and construction and projected long-term maintenance costs)
 are considered and compared to the benefit that will result from implementing the remedy.

 8. State Acceptance
The State has an opportunity to review the documents in the Administrative Record and the Proposed Plan and offer
comments. The State may agree with, oppose, or have no comment on the preferred alternatives.

9. Community Acceptance
During the public comment period, interested persons or organizations may comment on the alternatives.   These
comments are considered in making the final remedy selection.  The comments are addressed in a document called
Responsiveness Summary which is part of the Record of Decision.


The following is a narrative analysis for the alternatives considered:


 Overall Protection of Human Health and the Environment: Based on an analysis of site data,  no
 findings of chemicals of concern, and criteria for performing a risk analysis, it was concluded that the
 site does not pose an unacceptable risk to human health or the environment.  There is no risk
 identified as a result of past activities.

 Compliance with Applicable or Relevant and Appropriate Requirements  (ARARs): The RI/
 FS was conducted in accordance with the CERCLA as amended by the SARA and the National Oil
 and Hazardous Substances Pollution Contingency Plan.   Since  no further  action is  being
 proposed, further compliance with ARARs is not necessary.

 Long-term Effectiveness or Permanence:  Since no chemical of concern was found, no future
 remedial activity is necessary. Therefore, this criterion is  not applicable.
                                                11

-------
 Reduction of Toxicity, Mobility or Volume through Treatment: This criteria is not applicable
 since no remedial action is warranted.

 Short-Term Effectiveness:  No short term risks were identified during the RI/FS. Since no further
 action is recommended, short term risks of exposure from future response actions are not present.

 Implementability:  Since no further action is recommended, implementability is not an issue.

 Cost: Since no further action is recommended, cost is not an issue.

 Regulatory Acceptance: TNRCC and EPA have been consulted throughout the investigations at
 Site 13  and  14.  Both agencies have reviewed the Proposed Plan for No Further Action.  The
 preferred alternative of No Further Action was fully evaluated during the public comment period, and
 support for the alternative has been indicated.
Community Acceptance:  Community comments will be an important consideration in the final
decision for the site. A public meeting was held July 18, 1995 and verbal public comments were
received. No written comments were received during the public comment period.  These comments
have been addressed in the Responsiveness Summary included as Appendix B.

I.  The Selected Remedy

Based on the information available and studies performed, the U.S. Army believes that no further
remedial action is warranted at Sites 13 and 14.

J.  Statutory Determination

The primary responsibility at CERCLA sites is to select actions that are protective of human health
and the environment.  Section  121 of CERCLA requires that the selected action for the site
comply with applicable or relevant and appropriate environmental standards established under
Federal and State environmental laws, unless a waiver is granted.  The selected remedy must also
be cost effective.  The following sections discuss how the selected alternative for LHAAP 13 and
14 meet the statutory requirements.

Protection of Human Health  and the Environment:

Based on an analysis of site data,  no findings of chemicals of concern, and criteria for performing
a risk analysis, it was concluded  that the site does not pose an unacceptable risk to human health
or the environment.
                                          12

-------
 Compliance with Applicable or Relevant and Appropriate Requirements:

 The RI/FS was conducted in accordance with the CERCLA as amended by the SARA and the
 National Oil and Hazardous Substances Pollution Contingency Plan.  Since no further action is
 being proposed,  further compliance with ARARs is not necessary.

 Cost Effectiveness:

 Since no further  action is recommended, cost is not an issue.

 Use of Permanent Solutions and Alternative Treatment Technologies  or Resource Recovery
 Technologies to the Maximum Extent Practicable:

 Since no further action is recommended, this is not an issue.

Preference for Treatment as a Principal Element:

Since no further action is recommended, this is not an issue.
                                          13

-------

-------
      APPENDIX A

  THE STATE OF TEXAS
LETTER OF CONCURRENCE

-------

-------
Barry R. McBee, Chairman
R. B. "Ralph" Marquez, Commissioner
John M. Baker, Commissioner
Dan Pearson, Executive Director
            TEXAS NATURAL RESOURCE CONSERVATION COMMISSION
                          Protecting Texas by Reducing and Preventing Pollution

                                 October  30,  1995
   Mr. Myron O. Knudson, P.E., Director
   Superfund Division
   U. S. Environmental Protection Agency
   Region 6
   1445 Ross Avenue
   Dallas, TX 75202-2733

   RE:   Record of Decision for Areas Referred to as Sites 13 and 14
         Within the Longhorn Army Ammunition Plant

   Dear Mr. Knudson:

   We have reviewed the proposed Record of Decision (ROD) for the No Further Action at Sites 13
   and 14 within the Longhorn Army Ammunition Plant (or "LHAAP").  We concur that the remedy
   described in the December 1995 ROD is the most appropriate for these sites.

   Based on previous studies and surveys, no remedial action is "'arranted to protect human health
   and the environment at LHAAP Sites 13 and 14.  This decision complies with Federal and State
   applicable or relevant and appropriate requirements and is cost effective.

   Sincerely,
   Dan Pearson
   Executive Director

   DP/MM/mm

   cc:    David Tolbert, LHAAP (SIOLH-OR)
         Jonna Polk, COE Tulsa District (CESWT-PP-EA)
         Lisa Price, EPA Region 6 (6SF-AT)
                      P.O. Box 13087  •  Austin, Texas 78711-3087  •  512/239-1000

-------

-------
           APPENDIX B

    RESPONSIVENESS SUMMARY

       NO FURTHER ACTION
          LHAAP 13 & 14
LONGHORN ARMY AMMUNITION PLANT

-------

-------
                               NO FURTHER ACTION
                                   LHAAP 13 & 14
                     LONGHORN ARMY AMMUNITION PLANT
 This Community Relations Responsiveness Summary provides written responses to comments
 submitted during the public comment period (6 July to 7 Aug 1995) regarding the Proposed Plan
 of Action for LHAAP 13 & 14.

 Section I: Background of Community Involvement and Concerns. This section provides a brief
 history of community interest and concerns raised during the remedial planning activities at the
 sites.

 Section II: Summary of Major Comments Received. The comments (both oral and written) are
 summarized. The U.S. Army responses are provided.

 I.  Background of Community Involvement and Concerns

 The community surrounding the Longhorn Army Ammunition Plant (LHAAP) is aware of
 histories associated with Sites  13 & 14.  This awareness is evident by the community participation
 in the public meeting held at Karnack High School on 18 July 1995, and by participation of local
 officials and community activists in the Technical Review Committee meetings held quarterly at
LHAAP since 1992.  The community has not expressed any opposition to the proposal for no
further action at the sites. However, the community has raised some concerns through comments
made during the public meeting. The comments received from the community concentrated
mainly on technical aspects of the previous Remedial Investigation (El).

II. Summary of Major Comments Received

The Proposed Plan of Action was released to the general public on 6 July 1995. The public
 comment period began 6 July and ended 7 August 1995. A public meeting was held on 18 July
 1995 at Karnack High School. The purpose of the meeting was to discuss the proposed plan and
to solicit public comments on  no further action at LHAAP 13 & 14. Representatives of the U.S.
 Army made presentations about the history  of the sites and answered public comments during the
public meeting. Representatives of the Texas Natural Resource Conservation Commission
 (TNRCC) attended the meeting and assisted in the responses to public comments. Notice of the
 comment period and  public meeting was given  in the Marshal News Messenger and approximately
 1,500 invitation letters and fact sheets were mailed to local citizens.

 The following comments and questions were received during the public meeting. A full account
 of the public meeting can be found in the public meeting transcripts that are documented in the
 LHAAP Administrative Record. There  were no written comments submitted during the public
 comment period.

-------
 1.     Comment by Ms. Gail Masters:
       What type of contaminants were you looking for? Was soil and water investigated?

       Response:
       The Remedial Investigation field work conducted in 1993 investigated soil and
       groundwater. Analytes tested were explosives, volatile organics, semi-volatile organics,
       eleven metals, and anions.

 2.     Comment by Ms. Gail Masters:
       How far from the site do they test?

       Response:
       The area of investigation is based on interviews with past employees familiar with the site
       and from historical documentation (aerial photo's, etc.). Generally, if this information is
       limited initial field screening techniques are used to delineate the site.  The actual size of
       the sampling area (borings and monitoring wells) was 100'x75'forLHAAP 13 and
       75'x50'for LHAAP 14.l
3.      Comment by Ms. Ruth Culver:
       Is it correct that there were three core samples taken from each suspected site?

       Response:
       There were four soil borings taken at LHAAP 13 and three soil borings taken at LHAAP
       14.

4.      Comment by Ms. Culver:
       How do you decide within a suspected area where these soils borings will be placed?

       Response:
       Since these were suspected sites with undocumented activities, and the exact size and
       location of them are not known, the process for selecting boring locations was a random
       distribution across the suspect area.

5.      Comment by Ms. Culver:
       How deep are the borings? How big is it?

       Response:
       The borings were drilled with a 6 3/4" diameter hollow stem auger to depths of 35 feet.
       lText in italics are additions for clarification to original answers given at the public
       meeting.

-------
 6.     Comment by Mr. Rick Michaels:
       When you say "suspected site," that is a suspected site because someone, a past employee,
       says they remember some time ago pouring or storing something there? Do you have any
       other documentation of site other than that?
       Response:
       No, that is the only information found in the search in the early 1980s.

7.     Comment by Ms. Culver:
       There were no aerial photographs?

       Response:
       Aerial photos were used in the initial investigations.  The only things shown were minor
       changes in topography.  Some years there were trees, and other years there weren't.

8.     Comment by Mr. Michaels:
       Is there access to these photos?

       Response:
       Aerial photos are located in the Thiokol Library . Mr. David Tolbert may be contacted for
       access to these.

9.     Comment by Ms. Culver:
       Is that the Thiokol or Longhorn library?

       Response:
       It is actually located at LHAAP in the Thiokol library.

10.    Comment by Mr. Bill Robertson:
       Do you have any speculation as to what happened to the material that was supposedly
       dumped here since there seems to be no evidence even under the ground?

       Response:
       The proximity of the suspected sites to Landfill 16 leads us to believe that the person
       interviewed could have been unsure of the locations of the landfill and indicated,
       erroneously, the new Sites LHAAP  13 and 14.

11.    Comment by Mr. Robertson:
       So, a "wild goose chase" sounds like a phrase that may have been used in this
       investigation.

-------
       Response:
       Indications from former employees, regardless of how minute they may be, must be
       followed up on. It is better to search and find nothing now, than to delay the search and
       find out twenty years from now that there was something there.

 12.    Comment by Mr. Robertson:
       With regard to the bare patches that show up on site 13, do these types of bare patches
       show up elsewhere on the plant site right now?

       Response:
       On the currently investigated sites, including LHAAP 13 and 14, there are no bare
       patches.  Other areas on the plant that have been reported to have activities are currently
       under investigation. However, other areas have not been surveyed.
13.     Comment by Mr. Baling:
       Were the bare patches themselves analyzed? What was found?

       Response:
       The bare patches were analyzed and no contamination was found.

14.     Comment by Ms. Culver:
       There were 1,350 notices mailed out?

       Response:
       There were 1,350 Fact Sheets mailed out, along with notice of the meeting.

15.     Comment by Ms. Culver:
       What area do you mail those to?

       Response:
       Everyone in the 75661 zip code.

16.     Comment by Ms. Culver:
       Then why is the repository information put in the Marshall Library, when those people are
       not included in the notification?

       Response:
       Records are also located on LHAAP for people in this zip code.

17.     Comment by Ms. Culver:
       Access to those records are not readily accessible due to the level  of security on the plant.
       I would like to make a suggestion that the Karnack High School library be used for the
       repository for this area. (If it is alright with the school).

-------
       Response:
       The LHAAP copy could be moved to the school library.  However, it would have to be
       investigated to assure that the library had sufficient room for the repository and not have a
       negative impact on the room needed for the students. Accessability during summer break
       would also be difficult. Asofl August the Administrative Record is in the KarnackHigh
       School Library. Public notice of this change was in the Marshall Messenger 20 August
       1995.

 18.    Comment by Ms. Culver:
       It was simply a suggestion. Wilma Subra, technical adviser for the community, and I
       spoke to the Marshall Lions Club today. Approximately 30 people were in attendance.
       Some of those in attendance expressed concern over not being notified personally of the
       meetings and other activities associated with the environmental program at LHAAP. I
       reminded them that notice was provided in the newspaper.

       Response:
       In addition to people hi this zip code, people who have attended previous meetings and
       have provided their mailing address are notified.  We will consider all options to
       providing better access to the public.

19.    Comment by Ms. Culver:
       For the record, I would like to emphasize the concern for using as many local people as
       possible  for the work force hi the environmental program at LHAAP.

       Response:
       An emphasis is placed on all our contractors to use as many local sub-contractors as
       possible.  This is sometimes difficult, however, because of the degree of technical
       knowledge and safety requirements needed to work on environmental projects.

20.    Comment by Ms. Culver:
       We are talking about dirt haulers.

       Response by citizen (R. Michaels):
       You would be surprised at the level of training and certification that is required of even a
       "dirt hauler" on an environmental site.

21.    Comment by Ms. Wilma Subra:
       The following comments are based on a very limited review of the data from the RI for
       LHAAP 13 and 14.

       A. Groundwater appears to be very shallow in some places,  five to eight feet below
       ground surface.  If the suspected waste such as explosive compounds, acidic waste,
       contaminated demolition and herbicide waste were previously dumped at the site, the
       potential exists for contamination that would impact the groundwater.

-------
 Response:
 Monitoring wells were installed at each site. Groundwater was tested and no site related
 contaminants were found.

 B.  The borings that were reported from these two locations range from a depth of five to
 thirty-five feet. Not one boring encountered any visible signs of waste or contamination
 at either site. After a limited review, it is my opinion that additional borings should have
 been performed to further investigate the possibility of waste material at the  sites.

 Response:
 Since this is a "suspected" site and no concrete information has been found to assure
 us that actual waste disposal activities occurred on either of these sites, the borings
 installed have adequately addressed any concern at this site.

 C. The author of the RI report actually delineated the extent of each site, or the potential
 extent of each site, and it is quite a bit larger than the area where the borings performed to
 determine whether or not they encountered any visible traces.

Response:
 The size of each site was a very "rough" estimate based on site interviews and limited
aerial photographs.  "Delineation of the extent" of each site is actually determined by
the investigation of the site through chemical analysis of soil samples.

D. Site 13 was described as having bare patches.  Five bare patches were actually
delineated on the site map.  I think that additional analysis of the parameters  should be
performed in order to determine what caused the lack of vegetation in the area called
"bare spots."

Response:
Samples were taken and analyzed in the areas designated as "bare patches" (these no
longer exist on the site). Contaminants related to suspected site activities were not found
in these areas. Patches could have been a result of many activities, such as little rain or
inadequate soil conditions.

E. In addition, soils at site 13 exceeded the background level for chromium  and nickel.
Now, these levels were not judged to be high enough to be a risk factor but they were
higher than background.

F. At site 14, the chemicals that exceeded the background were barium, chromium, and
nickel. The source of these contaminants should have been identified as part of this
limited investigation.

Response:
E&F.  These parameters slightly exceed calculated background levels.  However, they
are naturally occurring elements which exhibit a high degree of variability  in the area

-------
 and as such the slightly elevated concentrations should not be considered a result of
 plant activities.

 G. The Proposed Plan, RI/FS report section, made recommendations that no further
 action be performed at these two locations and a no further action decision document be
 prepared for each of these two sites. The report also recommended that the sites be
 removed from further consideration. I think these are pre-mature at this point.  Prior to
 making the final decision on no further action, additional studies should be performed at
 each of these two sites. Additional studies should be performed at each of these two sites.
 Additional borings should be performed at each of the two sites to further investigate the
 possibility of physical waste material buried in these sites.

 If physical waste is determined, then chemical analysis of the groundwater should be
 performed similar to ones performed on the four and three borings. Additional chemical
 parameters should be performed on the soil located in the bare spots. These analysis
 should determine  without a doubt what caused the lack of vegetated growth.

 Currently, the data appears inadequate to make a final decision of no further actions and
 recommendation that the sites be removed from further consideration.

 Response:
Due to the sketchy information on the undocumented activities of these two sites, the
proper amount of investigation has been accomplished at these sites. Soil borings -were
 analyzed for suspected contaminants and nothing was found. If the suspected activities
 had taken place, contaminants would have shown up in the groundwater. However, none
-were detected.   Based on the investigations performed, no further action is required at
 the two sites.
Additional written comments were not received.

-------

-------

-------

-------