PB96-964502
                                 EPA/ROD/R09-96/144
                                 May 1996
EPA  Superfund
       Record of Decision:
       Treasure Island Naval Station,
       Hunters Point Annex, Parcel A,
       San Francisco, CA
       11/28/95

-------

-------
1
                      HUNTERS POINT ANNEX
                               PARCEL A
                       RECORD OF DECISION
                   (Pursuant to the Comprehensive Environmental
                    Response, Compensation, and Liability Act)
                              November 16, 1995
                          U.S. Department of the Navy
                         Engineering Field Activity West
                      Naval Facilities Engineering Command
                        San Bruno, California 94066-2402
               Department of the Navy • Engineering Field Activity West

-------

-------
 i
 I
j
                                        HUNTERS POINT ANNEX

                                               PARCEL A
                                         RECORD OF DECISION
                            (Pursuant to the Comprehensive Environmental Response,
                                      Compensation, and Liability Act)
                                            November 16, 1995

  J


 J
                                       U.S. Department of the Navy,
                                      Engineering Field Activity West,
                                    Naval Facilities Engineering Command

-------

-------
                                 CONTENTS

Section                                                                 Page

1.0   DECLARATION FOR NO ACTION AT PARCEL A  	  1

      1.1    SITE NAME AND DESCRIPTION 	  1

      1.2    STATEMENT OF BASIS AND PURPOSE  	  1

      1.3    DESCRIPTION OF THE SELECTED REMEDY:  NO ACTION  	. .  1

      1.4    DECLARATION STATEMENT	  2

2.0   DECISION SUMMARY FOR PARCEL A  	  4

      2.1    SITE NAME, LOCATION, AND DESCRIPTION	  4

      2.2    SITE HISTORY   	  8

            2.2.1  Background	  8
            2.2.2  Site Inspection Activities at Parcel A	  9
            2.2.3  Remedial Investigation Activities at Parcel A	   12

      2.3    HIGHLIGHTS OF COMMUNITY PARTICIPATION	   12

      2.4    SCOPE AND ROLE OF THE NO ACTION ALTERNATIVE  	   13

      2.5    SITE CHARACTERISTICS  	   14

            2.5.1  IR-59  	   14
            2.5.2  IR-59 JAI		   15

      2.6    SUMMARY OF SITE RISKS	   17

            2.6.1  Human Health Risk Assessment	   17
            2.6.2  Qualitative Ecological Risk Assessment	   22

      2.7    DESCRIPTION OF "NO ACTION" ALTERNATIVE	   24

      2.8    EXPLANATION OF SIGNIFICANT CHANGES	   24

REFERENCES	   25

Appendices

A     RESPONSIVENESS SUMMARY

-------
 1

J

J
                                         FIGURES

          Figure                                                             Page

          1    FACILITY LOCATION MAP	  5

          2    HUNTERS POINT ANNEX PARCEL LOCATION MAP	  6

          3    PARCEL A SITE MAP . . .	  7



                                         TABLES

          Table                                                             Page

          1    SUMMARY OF SITE INSPECTION RESULTS FOR PARCEL A SITES
               REQUIRING NO FURTHER INVESTIGATION	  11

          2    SUMMARY OF GROUNDWATER ANALYTICAL RESULTS,
               IR-59 GROUNDWATER INVESTIGATION PARCEL A,
               HUNTERS POINT ANNEX	  16

          3    SUMMARY OF SOIL ANALYTICAL RESULTS FOR SVOCs
               AND PESTICIDES AFTER INVESTIGATION BY EXCAVATION
               AT IR-59 JAI PARCEL A, HUNTERS POINT ANNEX .	  18

          4    SUMMARY OF SOIL ANALYTICAL RESULTS FOR TPHs
               AFTER INVESTIGATION BY EXCAVATION AT IR-59 JAI
               PARCEL A, HUNTERS POINT ANNEX  	  19

          5    SUMMARY OF SOIL ANALYTICAL RESULTS FOR METALS
               AFTER INVESTIGATION BY EXCAVATION AT IR-59 JAI
               PARCEL A, HUNTERS POINT ANNEX  	  20

          6    RESULTS OF HUMAN HEALTH RISK ASSESSMENT, IR-59 JAI	  23
11

-------
                             1.0   DECLARATION FOR NO ACTION AT PARCEL A

  (           1.1           SITE NAME AND DESCRIPTION

  |                        Hunters Point Annex, Parcel A
                          San Francisco, California

             Hunters Point Annex (HPA) was deactivated and placed in industrial reserve in 1974.  In 1989, this
             federal facility was placed on the National Priorities List (NPL).  In  1991, HPA was selected and
             approved for closure under the Base Realignment and Closure (BRAC) program.

If           1.2           STATEMENT OF BASIS AND PURPOSE
  i
  (           This decision document presents the selected remedial action for Parcel A at HPA.  The selected
             remedy was chosen in accordance with the Comprehensive Environmental Response, Compensation,
  ~i
  I           and Liability Act of 1980 (CERCLA), as amended by the Superfund Amendments and
             Reauthorization Act of 1986 (SARA), and the National Oil and Hazardous Substances Pollution
  1           Contingency Plan (NCP). This decision is based on the administrative record for the site.

  j           The U.S. Environmental Protection Agency (EPA) and the California Environmental Protection
             Agency (Cal/EPA) concur with the selected remedy.

             1.3          DESCRIPTION OF THE SELECTED REMEDY: NO ACTION

             The U.S. Department of the Navy (Navy) and EPA Region IX have selected no action for the
 |           following sites at Parcel A of HPA:
 !
 |                 •     IR-59:  The ground water underlying Parcel A
                   •     IR-59 Jerrold Avenue Investigation (JAI): The soil at a residential lot on Jerrold
4                       Avenue within Parcel A
 i
i

-------
  !           These sites are the only two sites at Parcel A that were carried through to the remedial investigation
             (RI) stage.  All other sites investigated at Parcel A were determined by the Navy, EPA, and
  1           Cal/EPA to require no action at the conclusion of the site inspection (SI) stage of investigation. In
             selecting no action for the RI sites, the Navy has determined that the overall condition of Parcel A is
             protective of human health and the environment.

             1.4           DECLARATION STATEMENT

  I           Based on an evaluation of analytical data and other information, the Navy has determined that no
             remedial action is necessary to ensure the protection of human health and the environment at Parcel
 .; |           A.  EPA Region IX and Cal/EPA concur with the Navy's determination.  Specifically, this ROD
             selects the final remedy for sites IR-59 and IR-59 JAI at Parcel A.  The groundwater underlying
  j           Parcel A (IR-59) does not meet the present and probable municipal supply criteria as defined by the
             single well supply criteria in the San Francisco Bay Regional Water Quality Control Board (RWQCB)
  j           Resolution No. 89-39 (incorporation of "Sources of Drinking Water Policy"). The concentrations of
  *           semivolatile organic compounds (SVOC) and metals detected in groundwater samples  did not exceed
  ,           EPA Region IX preliminary remediation goals (PRO).  The only other substance detected, motor oil,
  I           is a petroleum product specifically excluded from the definition of "hazardous substance" and
             "pollutant or contaminant" in Section 101 of CERCLA  and is, therefore, outside the scope of this
  !           ROD. Although the  State of California has authority to regulate the remediation of motor oil in
             groundwater, the State does not intend to require further investigation, remediation, or groundwater
  i
  ;           monitoring (RWQCB 1995b). This parcel, however, will be subject to a deed notification so that
             future users of the parcel  will be informed that motor oil  was detected  in groundwater.  The
  I
  j           concentrations of hazardous substances in the soil at IR-59 JAI are either within or below EPA's
             acceptable risk levels or, for metals, are at ambient levels.  There are no other sites in Parcel A that
 i
 j
j

-------
i
i
j
             require investigation or remediation.  Hazardous substances are not present at Parcel A at
             concentrations above acceptable risk levels and, therefore, the 5-year review requirement of CERCLA
             Section 121(c) is not applicable.
            Mr. Michael McClelland                                          Date
            Navy BRAC Environmental Coordinator
            Naval Facilities Engineering Command, Engineering
            Field Activity West
                                                                               If' 3-?-
                v Julie Anderson                                               Date
              iief, Federal Facilities Cleanup Office
            'EPA Region IX
                ,
            Mr. 'Anthony J^Landis^Date
            Chief of Operation, Office of Military Facilities
            Department of Toxic Substances Control
            Cal/EPA
                                              	
            itis. lLoretta E(^rsamian                                            Date
            Executive Officer
            California Regional Water Quality Control Board
            San Francisco Bay Region

-------

-------
 .1
 i
j
                                   2.0    DECISION SUMMARY FOR PARCEL A

             2.1           SITE NAME, LOCATION, AND DESCRIPTION

             HPA is located on a promontory in southeast San Francisco (Figure 1).  The promontory is bounded
             on the north and east by the San Francisco Bay and on the south and west by the Bayview-Hunters
             Point district of the City of San Francisco.  The entire HPA covers 936 acres, 493 of which are on
             land and 443 of which are under water.  To  facilitate the environmental investigation and remediation,
             and ultimate transfer of the property, HPA was divided into several parcels (Parcels A through F)
             (Figure 2).  This ROD addresses the remedy for  sites at Parcel A.

             Parcel A is  bounded by the other portions of HPA and the Bayview-Hunters Point district (Figure 3).
             Parcel A covers approximately 88 acres.  Land to the northwest of Parcel A is used for residential
             purposes. The other HPA parcels that bound Parcel A are currently undergoing investigation  and
             remediation for future redevelopment. Under the local reuse authority's current land-use plan, those
             parcels will ultimately be used primarily for commercial and industrial purposes, whereas Parcel  A
             will be used for residential  as well as for light  commercial purposes.

             Parcel A consists of the upland area of HPA and  a portion of the lowlands. Ground surface
             elevations at Parcel A range from 0 to 18 feet above mean sea level (msl) in the lowlands to 180  feet
             above msl at the ridge crest.

             The peninsula forming HPA is within a northwest-trending belt of Franciscan bedrock.  Bedrock  is
             present at the ground surface over most of Parcel A.  In localized areas, the bedrock is overlain by
             fill material. There is evidence of past landslides on Parcel A.

             No wetlands or surface waters are located at Parcel A.  Limited quantities of groundwater are present
             in localized  fractures of the bedrock. However, Parcel A  groundwater is not suitable as  a potential
             source of drinking water because of low  well yield.  Groundwater from the bedrock discharges
             through springs and seeps along Parcel A slopes.

-------
HUNTERS  POINT  ANNEX
                 HUNTERS POINT ANNEX
               SAN FRANCISCO. CALIFORNIA
                     FIGURE  1
                     FACILITY
                 LOCATION  MAP
               ENVIRONMENTAL MANAGEMENT. INC.

-------
                                                         BAT VIEW HUNTERS
                                                          POINT DISTRICT
Legend
          PARCEL BOUNDARY
400'     0       400'    800*
     i-E>
     SCALE* l'=800'
                                                             NOTE.PARCEL F IS OFFSHORE AREA OF hPA

-------
\
 \
   \
    \
     \
                              FRANCISCO
                           BAY
                                HUNTERS POINT ANNEX
                              SAN FRANCISCO, CALIFORNIA
                                     FIGURE 2
                          HUNTERS  POINT ANNEX PARCEL
                                  LOCATION MAP
                                ENVIRONMFNTAI  MANAGFMFNT  INC.

-------
                                                BAYVIEW
                                           HUNTERS   POINT
                                                DISTRICT
STEAM LINE CSI-45D

PARCEL BOUNDARY

TRANSFORMER LOCATION CSI-5D

SEWER LINES CSI-5OD

STORM LINES CSI-5O}
                                      NON-UTILITY SI SITE
IR SITE
                         NOTES*
                         1. 1^46. SAN FRANCI
                           CONTROL DIAGRAM
                           LINES. P.W. DRAW^

                         2. AN ADDITIONAL SI-
                           UNDERLIES THE EN
                           NOT SHOWN.

-------
D NAVAL SHIPYARD.
'EAM AND GONDENSATE
^CX 1GO13-137

!R-5^ GROUNDWATER.
" PARGEL AND IS
                     15O'
  HUNTERS POINT ANNEX
SAN FRANCISCO,  CALIFORNIA
        FIGURE 3
       PARCEL  A
       SITE  MAP
                                                       ENvlRONMENTAL MANAGEMENT, INC

-------
No underground storage tanks (UST), aboveground tanks, drums, or hazardous materials storage
areas remain on Parcel A. Sewer lines, storm drains, and steam lines located in Parcel A were
included in the early investigations of the property, which found no further investigation was
required.

2.2            SITE HISTORY

2.2.1          Background

Hunters Point  was first developed for dry dock use in 1867. The Navy acquired title to the land in
1940 and began developing the area for various shipyard activities.  In 1942, the Navy began using
HPA for shipbuilding, repair, and maintenance.  From 1945 to  1974, the shipyard was primarily used
as a repair facility by the Navy.  The Navy discontinued activities at HPA in 1974.  From 1976 to
1986, the Navy leased 98 percent of HPA, including all of Parcel A, to the Triple A Machine Shop
(Triple A), a private ship repair company. In 1986, the Navy reoccupied the property.  Currently,
portions of Parcel A are subleased for use as artists' studios.

Throughout its history, both  the Navy and Triple A used Parcel A primarily for residential purposes.
In addition,  the Navy used one building on Parcel A as a radiation laboratory.  Most of the other
structures were used as offices and warehouses.  Currently, approximately 61 buildings are located on
the property, 45 of which are former residences.  In addition, the foundations of 43 other structures
are located on  Parcel A.

The Navy began environmental studies at HPA in 1984 under the U.S. Department of Defense's
Installation Restoration Program.  Between 1984 and 1991, the Navy performed a  series of
installation-wide investigations to identify potential source areas of contamination and to investigate
air quality (WESTEC Services, Inc. 1984; Aqua Terra Technologies [ATT11987;  EMCON
Associates 1987; Environmental Resources Management, West 1988; YEI Engineering, Inc. 1988a
and 1988b; Harding Lawson  Associates [HLA] 1992; Brown &  Caldwell  1995). In addition, the
Navy conducted investigations in discrete areas of Parcel A (HLA 1987 and 1988;  ATT 1987).

-------
 i
 i
j
In 1989, EPA added HPA to the NPL. In 1990, the Navy, EPA Region IX, and the State of
California entered into a Federal Facilities Agreement  (FFA) to coordinate environmental activities at
HPA.   In 1991, the U.S.  Department of Defense designated HPA for closure as an active military
base under its BRAC program.

2.2.2          Site Inspection Activities at Parcel A

As the first phase in the CERCLA process, the Navy conducted a preliminary assessment/site
inspection (PA/SI) of seven potential source areas identified during the Navy's previous
investigations.  Site-specific histories of each of these areas, referred to as SI sites, are provided
below.

        Parking medians in front of Building 901:  The landscaped medians in front of Building 901,
        the Officers* Club, were identified as a potential source because the medians  were filled in
        part with sandblast waste and oily materials. The medians are referred to as  site SI-19, which
        is shown on Figure 3.

        Buildings 816 and  818: Building 816 is the former Naval Radiological Defense Laboratory
        (NRDL) High Voltage Accelerator Laboratory. The NRDL conducted operations at the
        building until 1976. Because of the presence of a former drum storage area behind Building
        816, the area was identified as a potential  source area.  Building 818 is the former
        Chlorinating Plant used for chlorinating water.  These buildings and the surrounding areas are
        designated as site SI-41, which is shown on Figure 3.

        Former Building 906:  Building 906, the Gardening Tool House, was used to store pesticides.
       For this reason, the building was identified as a potential source area. It is designated as site
        SI-43, which is shown on Figure 3.

       Portions of the steam line system within Parcel A:  The steam line system, constructed  in
        1950, spans the entire installation.  The system was used to supply steam to heat facility
       buildings and docked ships and to facilitate the flow of oil through oil lines.  Steam for Parcel
       A was generated at boiler plants located on other parcels. The Navy identified the lines as a

-------
        potential source based on the remote possibility that waste oil was transported through the
        Parcel A steam lines. The HPA-wide steam line system is designated as site SI-45. The
        steam lines in Parcel A  are shown on Figure 3.

        Portions of the storm drain and sanitary sewer systems within Parcel A: The storm drain and
        sanitary sewer systems for HPA were constructed in the 1940s and 1950s as a combined
        system.  By 1976, the two systems had been separated.   Currently, the storm drains at Parcel
        A flow into storm drains at other parcels, eventually discharging into San Francisco Bay.
        Flow from the sanitary sewer system is directed to Pump Station A, which pumps sewage off
        site for treatment and ultimate discharge through the City of San Francisco's publicly-owned
        treatment works.  The HPA-wide system is referred to as site SI-50; the storm drains and
        sanitary sewer lines are shown on Figure 3.

        Locations of transformers containing polychlorinated biphenyls:   Buildings and areas
        throughout HPA where transformers containing polychlorinated biphenyls (PCB) were located
        are referred to as site SI-51.  At Parcel A, a visual inspection conducted as part of the SI
        identified one former transformer location near Building 819 and nine current transformer
        locations. SI-51 is shown on Figure 3.

        Former underground storage tank S-812: A steel UST installed in 1976 was used to store fuel
        for a boiler located in Building 813.  It is unknown when the UST was taken out of service.
        In August 1991, the UST and its associated piping were excavated and removed from the site.
        The former UST location is designated as site SI-77, which is shown on Figure 3.

An SI was performed  on each of these sites  in 1993 (PRC and HLA 1993).  The SI results are
summarized on Table 1.  The Navy concluded that no further action was required at the seven SI sites
described  above because the sites do not pose a risk to human health and the environment.  The EPA
and Cal/EPA concurred that  no  action is required at these sites.
                                              10

-------
TABLE 1    SUMMARY OF SITE INSPECTION RESULTS FOR PARCEL A SITES REQUIRING
            NO FURTHER INVESTIGATION
SITE
Building 901
Parking Medians
Buildings 816 & 818
Former Building 906
Steam Lines
Storm Drains &
Sanitary Sewer
Transformers
UST S-812
SI
DESIGNATION
SI-19
SI-41
SI-43
SI-45
SI-50
SI-51
SI-77
CONSTITUENTS
DETECTED DURING SITE
INSPECTIONS
SVOCs
Pesticides
PCBs
Petroleum hydrocarbons
Metals
VOCs
SVOCs
Petroleum hydrocarbons
Metals
VOCs
SVOCs
Pesticides
Herbicides
PCBs
Petroleum hydrocarbons
Metals
No contamination was found.
Pesticides
Herbicides
No contamination was found.
VOCs
SVOCs
Petroleum hydrocarbons
Metals
RISK ASSESSMENT RESULTS
Soil characterized during the investigation by
excavation* was replaced with clean soil.
Soils remaining do not pose a threat to
human health or the environment.
Soil characterized during the investigation by
excavation* was replaced with clean soil.
Soils remaining do not pose a threat to
human health or the environment.
Soil characterized during the investigation by
excavation* was replaced with clean soil.
Soils remaining do not pose a threat to
human health or the environment.
No threat to human health or the
environment.
No threat to human health or the
environment.
No threat to human health or the
environment.
No threat to human health or the
environment.
Note:
      An investigation technique combining soil excavation and site characterization.
                                          11

-------
2.23         Remedial Investigation Activities at Parcel A

Based on data collected during the SI investigation at site SI-50 (the storm drains and sanitary sewer
systems), the Navy conducted an RI of the groundwater underlying Parcel A (referred to as the IR-59
site).  During the groundwater investigation, the Navy discovered sandblast grit waste containing
paint chips in the backfill of a sanitary sewer line in a lot along Jerrold Avenue.  As a result, the
Navy included this area (referred to as the IR-59 JAI site) in the RI.  The results of the RI are
presented in Section 2.5.

2.3           HIGHLIGHTS  OF COMMUNITY PARTICIPATION

In the late 1980s, the Navy formed a technical review committee (TRC) consisting of community
members and representatives of regulatory agencies.  The TRC met to discuss environmental issues
pertaining to HPA.  In 1993, pursuant to the Defense Environmental Restoration Program, 10 U.S.C.
Section 2705(d), the Navy formed a Restoration Advisory Board (RAB),  which replaced the TRC.
The RAB is composed of members of the community, the Navy, and the regulatory agencies.  The
RAB meets monthly to discuss environmental progress at HPA.

The draft RI report for Parcel A was released to the public in June 1995. The proposed plan for
Parcel A was released to the public in August 1995.  Both the draft RI report and the proposed  plan
were made available to the public in the administrative record file and in information  repositories
located at the City of San Francisco Main Library and the Anna E. Waden Branch Library.  In
addition, the proposed plan was mailed to the more than  1,100 people on the HPA project mailing
list.  A notice of availability of the proposed plan was published in The San Francisco Sunday
Examiner/Chronicle on August 6, 1995; in The Independent on August 15, 1995; and in The New
Bayview on August 20, 1995.  A 30-day public comment period on the proposed plan was held  from
August 7,  1995, through September 5, 1995. A public meeting was held on August 22, 1995.  At
that meeting, representatives of the Navy presented the basis for the proposed no action alternative
and were available to answer questions about the proposed plan.  A response to the comments
received at the public meeting and during the public comment period is included in the
Responsiveness Summary, which is Appendix A of this ROD.  These community participation
activities fulfill the requirements of Section 113(k)(2)(B)(i-v) and Section 117(a)(2) of CERCLA.

                                             12

-------
2.4            SCOPE AND ROLE OF THE NO ACTION ALTERNATIVE

HPA is a large federal facility containing numerous potential source areas. To facilitate the
investigation, remediation, and property transfer process under BRAC, sites on HPA have been
grouped into geographical parcels.

In addition to Parcel A,  five other parcels have been designated and are undergoing assessment
activities.  Under the current FFA schedule, the final ROD approval dates for the other parcels are as
follows:

               Parcel Designation                          Final ROD Approval Date
                    Parcel B                                   February 1997
                    Parcel C                                   December 1997
                    Parcel D                                      July 1997
                    Parcel E •                                      May 1998    _

The Navy also intends to perform an ecological  risk assessment for the recently designated Parcel F,
which encompasses the submerged portions of HPA.

The Navy's site management  strategy is to accelerate actions at sites while identifying and closing out
assessment activities at sites not requiring action. This strategy meets  President Clinton's goal of
quickly identifying parcels of property that can be transferred to the community or other agencies
under the BRAC program.

Parcel A is the first HPA parcel for  which a remedy has been selected. Only two sites (IR-59 and
IR-59 JAI) on Parcel A were  carried through to  the RI stage.  This ROD selects the  remedy for these
two sites. As a result of the site investigation activities conducted during the RI, the soil at IR-59 JAI
does not pose a significant risk to human health  or the environment; therefore, no action is necessary
for the site.  Similarly, no action is necessary for IR-59, the groundwater underlying Parcel A.
Because the groundwater does not meet the present and probable municipal supply  criteria as defined
by the single well supply criteria in the RWQCB Resolution No. 89-39 (incorporation of "Sources of

                                              13

-------
Drinking Water Policy"), it is unlikely to be used as a source of drinking water.  Moreover, historical
records indicate groundwater  at Parcel A has never been used as a drinking water source, and water
in the bedrock is found only in limited  quantities and in isolated areas. For these reasons, there is no
complete pathway for exposure to groundwater. The SVOCs and metals detected in groundwater
samples  did not exceed EPA Region IX PRGs.  The only other substance detected was total petroleum
hydrocarbons (TPH) as motor oil, at concentrations of 600 micrograms per liter or less.  TPH is not
a hazardous substance as defined in CERCLA.  Although the State of California has authority to
regulate  the remediation of motor oil  in groundwater, the State does not intend to require further
investigation, remediation, or groundwater monitoring (RWQCB 1995b).  This parcel, however, will
be subject to a deed notification so that future users of the parcel will be informed that motor oil was
detected  in groundwater. In summary,  based on current information, no action is required at Parcel
A because the sites do not pose an unacceptable risk to human health and  the environment.

2.5            SITE CHARACTERISTICS

2.5.1          IR-59

The Parcel A groundwater investigation was initiated as part of the SI for the Parcel A storm drain
and sanitary sewer systems (SI-50).  During the groundwater assessment of these systems,
groundwater collected from a boring was analyzed and found to contain SVOCs,  TPH as motor  oil,
and metals.  As a result, the preliminary investigation conducted during the SI was expanded to  an
RI, and the groundwater under Parcel A was designated as  site IR-59. Although  TPH is not defined
as a hazardous substance under CERCLA,  TPH analysis was included in the RI analytical program.

The only aquifer present at Parcel A is  the bedrock aquifer, which is the upper weathered and deeper
fractured portions of the Franciscan bedrock.  Groundwater in bedrock at Parcel A  is present in
localized fractures that are sporadic and discontinuous.

Parcel A groundwater does not meet the present and probable municipal supply criteria as defined by
the single well criteria in RWQCB Resolution No. 89-39 (incorporation of "Sources of Drinking
Water"). Under the RWQCB definition, groundwater is not a suitable or potentially suitable source
of water  for municipal or domestic water supply if it does not provide sufficient water to supply a

                                              14

-------
single well capable of producing an average, sustained yield of 200 gallons per day (gpd).  Based on
aquifer tests, Parcel A ground water wells are unable to produce 200 gpd.  The RWQCB agrees that
Parcel A groundwater does not meet the criteria as a source of drinking water under the RWQCB's
definition (RWQCB 1995a).

During the RI, the Navy collected groundwater grab samples from open boreholes and trenches as
well as samples from six monitoring wells. Samples were analyzed for volatile organic compounds
(VOC), SVOCs, TPH,  pesticides, PCBs, and metals.   To evaluate whether further action was
appropriate, analytical results were compared against EPA Region IX PRGs and federal and state
maximum contaminant  levels (MCL) for drinking water.

No VOCs were detected in any groundwater samples.  The only SVOCs detected (naphthalene, 2-
methylnaphthalene, and n-nitrosodiphenylamine) were present at concentrations below EPA Region IX
PRGs. The highest concentrations of the SVOCs  detected and their respective PRGs are shown on
Table 2.  Arsenic was detected in groundwater samples at levels above its PRG but below MCLs.
Low concentrations of TPH as motor oil were detected in two small areas on Parcel A.  A
comprehensive discussion of the groundwater investigation and the nature and extent of the
compounds detected in  groundwater is presented in the RI report (PRC 1995b).  In summary, no
hazardous substances as defined under CERCLA  were detected above health-based levels in any of the
groundwater samples.

2.5.2         IR-59 JAI

The RI at IR-59 JAI was initiated upon the discovery of sandblast grit containing paint chips during
the groundwater investigation at a lot along Jerrold Avenue.  A sample of mixed sandblast grit and
soil was analyzed and found to  contain pesticides, low  levels of SVOCs, TPH as diesel fuel and as
motor oil, and metals.

The Navy used field screening analysis and "investigation by excavation" to characterize the nature
and extent of chemicals of concern in soil and to accelerate the overall investigation of IR-59 JAI.
                                             15

-------
TABLE 2    SUMMARY OF GROUNDWATER ANALYTICAL RESULTS",
            IR-59 GROUNDWATER INVESTIGATION PARCEL A,
            HUNTERS POINT ANNEX
Notes:
Delected Analyte
PRGb
Maximum Detected
Concentration
SVOCs
2-Methylnaphthalene
Naphthalene
n-Nitrosodiphenylamine
NEC
240
14
42
12
12
TPHs
TPH as motor oil
' NE
600
Metals
Aluminum
Antimony
Arsenic
Barium
Calcium
Magnesium
Manganese
Molybdenum
Nickel
Potassium
Sodium
Vanadium
37,000
15
0.038
2,600
NE
NE
180
180
730
NE
NE
260
216d
2.1d
3.1d, 3.8e
440d, 449*
44,700d, 45,500*
38,600*, 39,300*
28.4d, 19.9°
12.4d, 14.5e
2.3d-*
7,310d, 7,440*
82,048d, 83,400*
3.0*, 2.8*
      Concentrations in micrograms p>er liter
      EPA Region IX PRGs (EPA Feb 1995a)
      NE = Not established
Unfiltered samples
Filtered samples
                                      16

-------
 !           During the investigation, soil and sandblast grit were excavated and disposed of at an approved off-
            site facility, and confirmation samples were collected and tested using an EPA-approved
 ;           immunoassay-based test method.  Soil excavation and confirmation sampling continued until field
            testing resulted in pesticide concentrations below the detection limit.  In addition, samples were sent
 i           to a laboratory and analyzed for SVOCs, pesticides,  PCBs, TPH as motor oil and diesel, and metals.
            Soil excavated during the investigation was replaced  with clean soil.  Tables 3, 4, and 5 summarize
            data on the compounds in soil after the completion of the investigation. A comprehensive discussion
            of the soil investigation and the nature and extent of  compounds detected in soil is presented in the
            Parcel  A RI report (PRC 1995b).

 i           2.6            SUMMARY OF SITE RISKS

            2.6*1           Human Health  Risk Assessment

 ,           During the RI, the Navy considered the potential human health risks associated with sites IR-59 and
 1           IR-59 JAI. The RI risk analysis is described below.
 j
 1           Human exposure to groundwater at Parcel A is highly unlikely for the following reasons:

 I                  •       Parcel A groundwater is present only in limited fractures or in poorly interconnected
                           and sporadic fractures in the bedrock.
 1                  •       In areas where groundwater was detected, individual wells are capable of yielding
                           only insignificant and nonsustainable  quantities of water.
 |                  •       Historical records  confirm that groundwater in Parcel A bedrock has never been used
                           as a source  of drinking water.
 1                  •       The City of San Francisco's current groundwater policy excludes groundwater in
                           Parcel A bedrock from future development based on the distribution of water in the
                           bedrock and its characteristics.

            For these reasons, there is no complete pathway for exposure to groundwater.  Based on this fact and
|           the fact that CERCLA-regulated substances were not detected above PRGs, no human health risk
            assessment (HHRA) for exposure to groundwater was performed.  EPA and Cal/EPA concur that an
 I           HHRA for groundwater is unnecessary (EPA 1995b).
                                                          17

-------
           TABLE 3     SUMMARY OF SOIL ANALYTICAL RESULTS FOR SVOCs AND
                        PESTICIDES AFTER INVESTIGATION BY EXCAVATION^ AT IR-59 JAP
                        PARCEL A, HUNTERS POINT ANNEX
Detected Analyte
Detected Concentration
Range
Sample Detection
Frequency1*
PRGC
SVOCs
Benzo(a)anthracene
Benzo(a)pyrene
Benzo(b)fluoranthene
Benzo(k)fluoranthene
Chrysene
Fluoranthene
Indeno(l,2,3 -cd)py rene
Naphthalene
Phenanthrene
Pyrene
39-61
38-50
38-49
51 - 67
56 - 180
53 -200
22 -24
27
21 -91
78 - 270
4 of 6
4 of 6
3 of 6
3 of 6
4 of 6
6 of 6
3 of 6
1 of 6
6 of 6
6 of 6
610
61
610
6,100(610)d
24,000 (6,100)d
2,600,000
610
800,000
NEC
2,000,000
Pesticides
4,4'-DDD
4,4'-DDE
4,4'-DDT
Aldrin
alpha-BHC
alpha-Chlordane
gamma-Chlordane
Heptachlor
Heptachlor epoxide
0.64
0.94 - 250
1.2-420
0.38
1.5
0.5 - 97
0.46 - 97
1.7 - 37
0.94
1 of 25
21 of 25
23 of 25
1 of 25
1 of 25
13 of 25
12 of 25
2 of 25
1 of 25
1,900
1,300
1,300
26
71
340f
340f
99
49
           Notes:
                 Concentrations in micrograms per kilogram
                 Only samples of soil in which SVOCs or pesticides were detected after investigation by excavation are
                 listed.
                 EPA Region IX PRGs (EPA Feb 1995a)
                 Cal-modified PRGs (EPA 1995a)
                 NE = Not established
                 EPA Region IX PRG for chlordane (plain)
                                                   18
J

-------
1
           TABLE 4    SUMMARY OF SOIL ANALYTICAL RESULTS FOR TPHs AFTER
                       INVESTIGATION BY EXCAVATION AT IR-59 JAI" PARCEL A, HUNTERS
                       POINT ANNEX
Detected Analyte
TPH as diesel
TPH as motor oil
Detected Concentration
Range
8.6
7.1 -720
Sample Detection Frequency1*
1 of 4
4 of 4
           Notes:
                 Concentrations in milligrams per kilogram
                 Only samples of soil in which TPHs were detected after investigation by excavation are listed.
                                                 19

-------
TABLE 5    SUMMARY OF SOIL ANALYTICAL RESULTS FOR METALS AFTER
             INVESTIGATION BY EXCAVATION AT IR-59 JAI"
             PARCEL A, HUNTERS POINT ANNEX
Detected Analyte
Antimony
Arsenic
Barium
Beryllium
Chromium
(not speciated)
Cobalt
Copper
Lead
Manganese
Nickel
Zinc
Detected
Concentration
Range
0.98 - 10.7
0.43 - 8.1
54.1 - 810
0.24 - 0.56
42.4 - 1,790

10 - 173
6.2 - 609
3.7 - 101
286 - 1,075
41.7 - 2,928
25.2-423
PRGsb
31
0.32
5,300
0.14
210°

NEf
2,800
400(130)*
380
1,500(150)*
23,000
Detection
Frequency
Above PRGC
Oof 41
40 of 41
Oof 41
36 of 41
19 of 41

NE
Oof 41
Oof 41
35 of 41
1 of 41
Oof 41
HPALd
9.05
11.1
314.36
0.71
82 - 1,258

17 -129
124.31
8.99
NE
71 -3,061 *
109.86
Detection
Frequency
Above HPALC
1 of 41
Oof 41
1 of 41
Oof 41
1 of 41

1 of 41
Iof41
20 of 41
NE
Oof 41
9 of 41
Notes:
      Concentrations in milligrams per kilogram
      EPA Region IX PRGs (EPA Feb 1995a)
      Only samples of soil in which metals were detected after investigation by excavation are listed.
      Hunters Point Annex ambient  level (PRC 1995a)
      EPA Region IX PRG for total chromium
      NE =  Not established
      Cal-modified PRGs (EPA 1995a)
                                         20

-------
The Navy conducted an HHRA based on exposure to soil remaining at IR-59 JAI following the
investigation under both a commercial/industrial worker scenario and a residential scenario.  The
industrial/commercial assessment considered surface soils (0 to 2 feet below ground surface [bgs]),
whereas the residential assessment considered all soil samples (0 to 5.5 feet bgs). To evaluate human
health risks, EPA has established an acceptable range of risk levels that are presented as hypothetical
excess lifetime cancer risks (CR) for carcinogens. Acceptable exposure levels are generally
concentration levels that represent a hypothetical excess upper-bound lifetime cancer risk to an
individual of between 10"4 and 10"6 or less. EPA has also established hazard indices (HI) to evaluate
the risks associated with noncarcinogens.  An HI of less than 1 is generally considered protective of
human health. If the HI is greater than  1, an assessment of the chemicals is performed to determine
whether the HI represents an unacceptable noncarcinogenic human health risk.

EPA Region IX PRGs were used as reference concentrations to evaluate potential risks from exposure
to soils. The PRGs assume the reasonable maximum exposure (RME) to an individual that is
expected to occur. Risk-based PRGs use RME parameter values to estimate concentrations in
environmental media that correspond to  a CR of 10"6 or an HI of 1.0. The Region IX PRGs are used
to convert exposure point concentrations for each  chemical detected at each site to a CR or HI as
appropriate.  To characterize the CR, the Region IX PRG is used to convert the exposure point
concentration for each chemical of concern into a  CR number.

Commercial and industrial workers may be exposed to compounds detected at IR-59 JAI  through
direct soil exposure.  Direct soil exposure includes ingestion and dermal contact with soil and
inhalation of fugitive dusts.  The potential risks associated with direct soil exposure were determined
using EPA Region IX PRGs; for chromium, the PRG for total chromium was used.  The total HI was
calculated to be 0.1 under the commercial/industrial worker scenario. Because this value is less  than
1, noncarcinogenic health effects are not expected under the commercial/industrial worker scenario.
The estimated CR for all detected chemicals from soil exposure is 5 x 10"7, which is below the lower
end of EPA's acceptable risk range of 10"4 to 10"6. Therefore, no significant carcinogenic risks are
expected from exposure to the remaining IR-59 JAI soils under a commercial/industrial worker
scenario.
                                              21

-------
Future residents may be exposed to chemicals through direct soil exposure and through ingestion of
homegrown produce.  The potential risks associated with direct soil exposure were determined using
the EPA Region IX PRGs; for chromium, the PRG for total chromium was used. The potential risks
related to ingestion of homegrown produce were calculated using standard risk assessment
methodology.  To account for all potential risks, the residential HI was calculated for exposure of
children to soil, and the residential CR was calculated for the first 30 years of life.  Nickel,
chromium, and manganese primarily drive the noncarcinogenic risk (the HI).  Using the toxicity value
for manganese based on food ingestion, the HI is estimated to slightly exceed 1.0.  However, this HI
includes chromium and nickel which are present at concentrations similar to ambient levels (see Table
5). Excluding ambient concentrations of chromium and nickel, the HI is estimated to be less than
1.0. The CR is primarily driven by chromium, benzo(a)pyrene, and heptachlor. The total estimated
CR at IR-59 JAI under the residential use scenario is estimated to be 7 x 10"6, which is within EPA's
acceptable risk range. Accordingly, under a residential use scenario, no significant carcinogenic risks
are expected from exposure to IR-59 JAI soils.

Table 6 summarizes the HHRA results. The RI report presents a comprehensive analysis and
discussion of the human health risk assessment (PRC 1995b).  Based on the results of the risk
assessment, the Navy, EPA, and Cal/EPA agree that site IR-59 JAI does not pose a significant threat
to human  health. The Navy, EPA, and Cal/EPA further agree that, because no exposure to
groundwater will occur, site IR-59 does not pose a threat to human health.

2.6.2          Qualitative Ecological Risk Assessment

Potential risks to ecological receptors from Parcel A were qualitatively evaluated by the Navy as part
of the Basewide Phase 1A ecological risk assessment (PRC 1994) and by the EPA in a screening level
qualitative ecological risk  assessment (QERA)(EPA 1994). Because most of Parcel A is developed
and covered by manmade  structures, such as housing and roads, the Basewide Phase  1A ecological
risk assessment does not identify any significant exposure routes for terrestrial species.  Accordingly,
the ecological risk assessment report concludes that the risk to ecological receptors is minimal.
Likewise, in the QERA, EPA concludes that the risks to terrestrial ecological receptors are minimal.
based on the limited availability of habitat, the scarcity of potential receptors, and the low  level of
compounds detected.

                                              22

-------
1
          TABLE 6    RESULTS OF HUMAN HEALTH RISK ASSESSMENT,
                      IR-59 JAI
Exposure Scenario
Industrial/Commercial
(Current)
Residential
(Future)
Exposure Pathway
Soil ingestion
Dermal contact
Inhalation of dust
Soil ingestion
Dermal contact
Inhalation of dust
Ingestion of produce
HP
0.1

-------
2.7            DESCRIPTION OF "NO ACTION" ALTERNATIVE

Based on the results of the RI, as described in this ROD, the two RI sites, IR-59 and IR-59 JAI, do
not pose an unacceptable risk to human health or the environment.  Specifically, IR-59, the
groundwater underlying Parcel A, does not meet the present and probable municipal supply criteria as
defined by the single well supply criteria in RWQCB Resolution No. 89-39 (incorporation of
"Sources of Drinking Water Policy"); therefore, it is unlikely to be used as a source of drinking
water.   Moreover, the concentrations of SVOCs and metals detected in groundwater samples did not
exceed EPA Region IX PRGs. The only other substance detected, motor oil, is a petroleum product
specifically excluded from the definition of "hazardous substance"  and "pollutant or contaminant" in
Section 101 of CERCLA and is, therefore, outside the scope of this ROD.  Although the State of
California has authority to regulate the remediation of motor oil in groundwater, the State does not
intend to require further investigation, remediation, or groundwater monitoring (RWQCB 1995b).
This parcel, however, will be subject to a deed notification so that future users of the parcel  will be
informed that motor oil  was detected in groundwater.  After the investigation by excavation, the
concentrations of hazardous substances in the soil at IR-59 JAI are either within or below EPA's
acceptable risk levels or, for metals, are at ambient levels.  Accordingly, no action is appropriate for
the RI sites.  The EPA and Cal/EPA agree with this determination. All other SI sites investigated in
Parcel A were determined to require no further action at the conclusion of the SI stage of
investigation. The Navy's selection of no action for the RI sites reflects the determination that the
overall condition of Parcel A is protective of human health and the environment.

2.8            EXPLANATION OF SIGNIFICANT CHANGES

The proposed plan for the Parcel A RI sites was released for public comment in August 1995.  The
proposed plan identifies no  action as the preferred alternative for the sites.  The Navy and EPA
reviewed all written and oral public  comments submitted during the public comment period.  Upon
review of these  comments, it was determined that no significant changes to the remedy originally
identified in the proposed plan were necessary.
                                             24

-------

-------
                                       REFERENCES
Aqua Terra Technologies (ATT).  1987.  "Risk Assessment, Proposed Housing Areas 1 and 2,  Naval
       Station Treasure Island, Hunters Point Annex."  December.

Brown & Caldwell. 1995.  "Final Draft Report for Air Monitoring Project, Hunters Point Annex."
       Phase II.  January.

California Regional Water Quality Control Board, San Francisco Bay Region (RWQCB). 1989.
       Resolution 89-39, Sources of Drinking Water Policy.

RWQCB.  1995a.  Letter Regarding Response to Navy's Proposal to Designate Parcel A as a Non
       Drinking Water Source at Hunters Point Annex, San Francisco, California.  From Steven R.
       Ritchie to Michael McClelland, Base Realignment and Closure Environmental Coordinator,
       Engineering Field Activity West.  May 10.

RWQCB. 1995b.  Letter Regarding Draft Proposed Plan - Hunters Point Annex.  From Richard Hiett
       to Cyrus Shabahari, Department of Toxic Substances Control.  July 27.

EMCON Associates.  1987.  "Area Study for Asbestos-Containing Material and Organic and
       Inorganic  Soil Contamination, Hunters Point Naval Shipyard (Disestablished), San Francisco,
       California." July.

Environmental Resources Management, West. 1988.  "Fence-to-Fence Hazardous Materials  Survey,
       Naval Station Treasure Island, Hunters Point Annex, San Francisco, California." Volumes I
       and II. July.

Harding Lawson Associates (HLA).  1987.  "Subsurface Investigation, Proposed Housing Areas 1  and
       2, Ex-Hunters Point Naval Shipyard, San Francisco, California."  October 30.

HLA.  1988.  "Officers Club Investigation, Naval Station Treasure Island, Hunters Point Annex, San
       Francisco, California." November 2.

HLA.  1992.  "Draft Final Air Sampling Report and Work Plan, Naval Station Treasure Island,
       Hunters Point Annex,  San Francisco, California."  Phase I.  July 31.

PRC Environmental Management,  Inc. (PRC) and HLA. 1993.  "Parcel A Site Investigation Report,
       Draft Final, Naval Station, Treasure Island, Hunters Point Annex, San Francisco, California."
       October.

PRC. 1994.  "Phase IA Ecological Risk Assessment, Volumes 1 and 2: Task  1, 2, and  3 Summary
       Reports, Naval Station Treasure Island, Hunters Point Annex, San Francisco, California."
       September.

PRC. 1995a.  "Calculation  of Hunters Point Ambient Levels." Draft.  April  11.
                                             25

-------
j
                                             REFERENCES (Continued)

            PRC.  1995b.  "Draft Final Parcel A Remedial Investigation Report, Hunters Point Annex, San
                   Francisco, California." September 22.

            U.S. Environmental Protection Agency (EPA).  1994.  "Screening-Level Ecological Risk Assessment
                   of Hunters Point Annex, Parcel A, Naval Station, Treasure Island, Hunters Point Annex, San
                   Francisco, California." Draft.

            EPA.  1995a.  "Region IX Preliminary Remediation Goals First Half 1995." February 1.

            EPA.  1995b.  "Comments on Parcel A Remedial Investigation Report Outlines/  Letter from Alydda
                   Mangelsdorf, EPA Remedial Project Manager, to Richard Powell,  EFA WEST. April 13.

            WESTEC Services, Inc.  1984.  "Initial Assessment Study Hunters Point Naval Shipyard."

            YEI Engineering, Inc. (YEI).  1988a.   "Sanitary Sewer System, Utilities Technical Study, Naval
                   Station Treasure Island, Hunters Point Annex, San Francisco, California."  Volume V.
                   April.

            YEI.  1988b. "Storm Drain System, Utilities Technical Study, Naval Station Treasure Island,
                   Hunters Point Annex,  San Francisco, California."  Volume VI.  December.
                                                        26

-------
      APPENDIX A
RESPONSIVENESS SUMMARY

-------

-------
                                        APPENDIX A
                               RESPONSIVENESS SUMMARY

                                      1.0 OVERVIEW

As set forth in its proposed plan, the U.S. Department of the Navy (Navy) selected no action for the
following sites at Parcel A of Hunters Point Annex (HPA):

       •      IR-59:  The groundwater underlying Parcel A
       •      IR-59 Jerrold Avenue Investigation (JAI):  The soil at a residential lot on Jerrold
              Avenue within Parcel A

These sites are the only two sites at Parcel A that were carried through to the remedial investigation
(RI)  stage.  All other sites investigated at Parcel A were determined by the Navy to require no action
at the conclusion of the site inspection (SI) stage of investigation.  U. S. Environmental Protection
Agency (EPA) Region IX and the California Environmental Protection Agency (Cal/EPA) concur
with the decision on the SI sites and the selection of the no action remedy for the RI sites.

                            2.0  COMMUNITY INVOLVEMENT

The Navy is responsible for conducting the community relations program for HPA. A community
relations plan was established in 1989 as a means of obtaining community input into the remedial
program at the installation. In addition, the Navy  formed a technical review committee (TRC),
consisting of community members and  regulatory agency representatives, to discuss environmental
conditions at HPA; in 1993, the TRC was replaced by a restoration advisory board (RAB) that meets
monthly to discuss environmental activities  at HPA.

The Navy has established  two information repositories for HPA.  One  information repository is at the
Anna E. Waden Branch Library located at 5075 Third Street in San Francisco.  The second
information repository is at the  City of San Francisco Main Library located at the Civic Center in San
Francisco.
                                            A-l

-------
A draft remedial investigation/feasibility study (RI/FS) for Parcel A was released to the public in June
1995.  Based on the conclusion in the RI that Parcel A does not pose a risk to human health and the
environment, the Navy, EPA, and Cal/EPA agreed that the Feasibility Study (FS) report was not
necessary.  Therefore, the final Parcel A RI report did not include an FS.

Prior to public release of the proposed plan, a draft of the proposed plan was provided to the
regulatory agencies for review and comment.  As explained in the responses to specific comments,
comments from Department of Toxic Substances Control (DTSC) and the Regional Water Quality
Control Board (RWQCB) placed in the record during the public meeting were on the earlier draft of
the proposed plan. As these comments were included during the public comment period, responses
are provided in this responsiveness summary.

In August 1995, the proposed plan for Parcel A was mailed to the more than 1,100 people on the
HP A project mailing list.  This mailing list has been developed over the years to include all interested
community members that the Navy has been able to reach through its community outreach efforts.  A
notice of availability of the proposed plan was published in  The San Francisco Sunday
Examiner/Chronicle on August 6, 1995;  in The Independent on August 15, 1995; and in The New
Bay view on August 20, 1995.  Copies of the proposed plan  were placed in the administrative record
and the information repositories.

A public comment period on the proposed plan was held from August 7, 1995, through September 5,
1995.  A public meeting was held on August 22, 1995.  A transcript of the public meeting is
available to the public at the information repositories. These community participation activities fulfill
the requirements of Section 113(k)(2)(B)(i-v)  and Section 117(a)(2)  of CERCLA.

The purpose of the responsiveness summary is to document public comments and questions during the
public comment period (August 7, 1995 to September 5, 1995) on the proposed no action remedy for
Parcel A and the Navy's responses to those comments.  Specifically, this responsiveness summary
provides responses to oral comments received on the proposed plan during the public meeting held on
August 22, 1995, at the Southeast Community Center located in the Bayview Hunters Point
neighborhood and written comments received during that meeting as well as written comments
                                             A-2

-------
            received from the City and County of San Francisco Department of Public Health (August 30, 1995)
            and ARC Ecology (September 2, 1995).

i
                                    3.0  SUMMARY OF MAJOR COMMENTS
  )
            Concerns raised during the public comment period focused on the results of the human health risk
  I          assessment and the appropriateness of a deed notification. In particular, members of the local
            community expressed concerns about the timing of the public meeting and the perceived slowness in
            the cleanup process.  The six major issues raised during the public comment period are summarized
            below.

i
 ^          Issue: Why did the Navy  hold a public meeting for the proposed plan for Parcel A prior to the
            restoration advisory board  (RAB) meeting?
  i
            The RAB meetings, held monthly, and the public meeting on the proposed plan for  Parcel A, held on
;;.]          August 22, 1995,  serve different purposes.   The RAB meetings allow community members to
            participate in the technical  aspects of the environmental program at HP A.  Approximately 20
  I          community members participate in these meetings.  The public meeting on the proposed plan,
            provided for under CERCLA, is intended to obtain comment  from a much broader cross section of
  j          the community. In this case, the  proposed plan was sent to approximately  1,100 community members
            to reach a broad cross-section of the community.  In addition, notice of the meeting was published in
  i
            three  different newspapers.

            To facilitate RAB involvement in the Parcel A remedy selection decision, the Parcel A RI report was
  ?
            sent to the RAB members in June 1995 and the RAB members had the opportunity to present their
            comments at the public meeting.  The Navy scheduled a RAB meeting to discuss the proposed plan
 <
            prior  to the general public  meeting on the proposed plan.  However, due to circumstances beyond the
            Navy's control, that meeting could not be held prior to the August 22, 1995 general public meeting
            and was, instead, held on August 23, 1995.
                                                        A-3

-------
Issue: Did the Navy adequately investigate Parcel A?

Yes.  The Navy investigated those areas on Parcel A that were suspected and/or reported to be
contaminated. The Navy collected soil and groundwater data from each suspected source area.  Based
on those data, the Navy performed human health risk assessments using EPA methodologies.  Those
assessments found that the sites do not pose an unacceptable human health risk.  Specifically, there is
no complete pathway for exposure to groundwater.  Additionally, at several sites, excavation  and
disposal of soil during  investigation activities reduced the risk.  The results of those investigations are
contained in the 1993 Parcel A site investigation report and the 1995 Parcel A remedial investigation
report.

Under CERCLA Section 120(h)(3), a deed for the transfer of property owned by the United States on
which hazardous substances were stored for one year or more, known to have been released, or
disposed of must contain a covenant warranting  that all remedial actions necessary to protect human
health and the environment have been taken before transfer and that any additional remedial actions
found to be necessary after transfer shall be conducted by the United States. At Parcel A, the Navy
has determined that all  known contamination has been investigated and addressed as appropriate and
the site conditions on Parcel A are protective of human health and the environment.

Issue: Can the Navy speed up the process of transferring the property at Hunters Point Annex?

The Navy's primary goal is a speedy transfer of property at HPA for reuse by the local community.
However, property cannot be transferred before the Navy is certain that all cleanup actions necessary
to protect human health and the environment have been taken.  To speed up the cleanup process, the
Navy has  formed a BRAC Cleanup Team (BCT) and a RAB to include the regulatory agencies and
the public in virtually every aspect of its planning  and execution.   The Navy has requested that the
agencies participate in the preparation of documents to minimize review and comment time and to
promote cooperation in the cleanup process, thereby accelerating cleanup and providing the basis for
property transfer. The Navy and the agencies have recently renegotiated the FFA schedules with the
intent of speeding up the cleanup process.
                                             A-4

-------
Issue: Will the Navy abandon the wells at Parcel A?

If the wells are not transferred to the new owners,  the Navy will abandon the wells at Parcel A in
accordance with applicable regulations prior to transfer of the property.

Issue: Will the Navy prepare a deed notification for the motor oil in groundwater at Parcel A?

The Navy will work with the RWQCB, San Francisco Redevelopment Agency (SFRA), and San
Francisco City Attorney staffs to negotiate and draft language that would be acceptable to all parties
concerning deed notification of the motor oil in groundwater at Parcel A. This process will occur as
part of the real estate transfer process.

Issue: Is the human health risk assessment (HHRA) adequate for the Parcel A investigations?

Yes.  The no action alternative was selected for Parcel A based on conclusions drawn from an
investigation to determine the nature and extent of  chemicals of concern and the HHRA.  The Parcel
A RI  HHRA, which was prepared using a methodology developed by the EPA, assumed current
industrial and future residential use of the parcel. The conclusions of the HHRA indicate that the
Parcel A sites are protective of human  health under both a current industrial and a future residential
scenario.

                 4.0  SPECIFIC COMMENTS RECEIVED AND RESPONSES

The comments or questions are extracted from the  transcript of the public meeting or from letters
received by the Navy, and the Navy has provided written responses below.   Unedited comments
from RWQCB, ARC Ecology, and individuals from the community are presented below in bold text,
followed by the Navy's responses.  The Navy  received comments that covered a range of issues.

Comments Received at the Public Meeting:

Oral comments from the public meeting from a member of the Restoration Advisory Board for
Hunters Point Annex.
                                             A-5

-------
                  Comment:    During the question and answer portion of the public meeting an
                                individual asked about the appropriateness of the Navy holding the public
                                meeting on the proposed plan before the plan was discussed with the
                                restoration advisory board.

                  Response:     The RAB was formed pursuant to Department  of Defense guidance to
                                facilitate community involvement in the environmental issues pertaining to
                                HP A.  The RAB consists of community individuals who provide input on
                                technical issues  pertaining to Hunters Point Annex. A public meeting,  which
                                is required by EPA's community relations guidance for proposed plans, is
                                intended to reach a broader cross section of the community. In fact,  the
                                proposed plan was distributed to approximately 1,100 community members on
                                August 4,  1995.
 ,                               To facilitate RAB involvement in the remedy selection process, the Navy
 I                               scheduled a RAB meeting to discuss the proposed plan prior to- the general
                                public meeting.  However, due to circumstances beyond the Navy's control,
 I                               the RAB meeting was held on August 23, 1995, the day after the August 22,
                                1995 public meeting.

           ARC Ecology had the following comments on the RI/FS:

           1      Comment:     Given the somewhat accidental discovery of the IR-59 JAI site, there are a
•v I
 j                               few statements in the IR/FS that give us some concern,  like "numerous
                                small, artificial silt is  present on the site as a result of filling, past
 i
 |                               construction, underground utility installation, and possibly filling ravines
 s
                                and swales."  And the statement "relatively small and unmapped silt
 I                               deposits" is the phrase.  Those give us some concerns, because we wonder
                                what the likelihood is  that those unmapped silt deposits are, in fact,
I                               contaminated. And I  would like to see this addressed somewhere in the
*                               RI/FS.
J
j
                                                       A-6

-------
                  Response:     There is a very low possibility of widespread use of sandblast grit material in
                                the artificial fill areas referred to in the Parcel A Remedial Investigation (RI)
                                report because the areas were filled in the early 1940's as part of the
                                preparation of the Hunters Point facility for use by the Navy or possibly even
                                earlier by prior owners. The sandblast grit material discovered at IR-59 JAI
                                was probably used to backfill a utility connection to a temporary building, and
                                was unassociated with the filling of ravines and swales.
I
Comment:     This involves the Work Plan Addendum that is presented in Appendix K,
              and this addendum was prepared to address Agency and Redevelopment
              Agency concerns about VOC's in the groundwater around the former
              underground storage tank at SA-12.  According to this addendum, four
              groundwater samples were to be taken on each side of the pit, some
              distance from the pit, to determine the extent of groundwater, possible
              groundwater contamination.  In fact, only one groundwater sample was
              collected.  The three other borings were dry. And I have a few questions
              about that sample.  First, I would like to know where it is.  It was not in
              the RI/FS where that groundwater was drawn from, which of the four
              borings it was taken from,  so I would like to have that addressed.  And
              I'm wondering if the sampling location that actually had water in it
              satisfied the  San Francisco  Redevelopment Agency's concern about
              groundwater contamination west of the site.  They were quite specific
              about wanting to understand that there is the plume traveling to the west;
              and since I don't know where the sample was taken, I don't know if that
              concern was  addressed.  And then, based on this one sample, one
              groundwater sample, the RI/FS concludes that no substantial groundwater
              contamination was found at that tank site. And I would need some help
              understanding how that one sample proves that there is no groundwater
              contamination as a result of that underground storage tank, former tank,
              that has been removed.
                                                      A-7

-------
Response:     The Navy is confident that there is no groundwater contamination problem at
               Parcel A.  Soil samples were taken from the underground storage tank (UST)
               excavation and around the former UST location.  Only very low levels of
               VOCs were detected in one of the soil samples.  The groundwater samples
               from the excavation indicated very low levels of VOCs in one sample and the
               duplicate  sample indicated no VOCs present. Because of this isolated
               detection, and to address the San Francisco Redevelopment Agency's
               concerns, four additional borings were drilled around  the UST.  Only the
               boring to  the west of the former UST encountered groundwater.  Samples
               from that  boring contained no chemicals of concern.  Section 3.0 of the draft
               final Parcel A RI report concerning former UST S-812 has  been revised to
               include more information about the locations of the borings and the
               groundwater sample.

Comment:     The RI/FS also does not address adequately the uncertainty associated
               with the conclusions presented in the RI/FS. I would like to see a little
               discussion about how adequate the sampling program was statistically to
               answer the questions that the RI/FS is supposed to answer, which is to
               describe the contamination at the Parcel A site.  So I would like a little
               discussion about the uncertainty associated with the sampling and the
               sampling  methodology and also the Risk Assessment part of the RI/FS.

Response:      The regulatory agencies and the Navy believe the conclusions of the draft final
               Parcel A RI report are  supported by the data collected during the site
               inspections and remedial  investigations. The sampling methodologies were
               discussed  with the regulatory  agencies prior to field activities.  The RI report
               describes the sampling  methodology, including the number and distribution of
               samples collected at each of the sites at Parcel A. Appendix E contains the
               human health risk assessment, which discusses the methodology and approach
               used by the Navy and approved by the agencies.   The  risk assessment also
               discusses the uncertainties associated with that analysis.
                                      A-8

-------
Comment:     The RI/FS did a weak job of explaining to me, anyway, what the extent of
               the motor oil contamination is all over the Parcel A site; and I would like
               to see a summary in the RI/FS that addresses specifically motor oil
               contamination on Parcel A.

Response:      Section 5.0 of the draft final Parcel A RI report addresses the distribution of
               total petroleum hydrocarbons as motor oil detected in all  IR-59 groundwater
               samples.  Total petroleum hydrocarbons as motor oil were detected at low
               levels, sporadically in borings and wells in the upland portion of Parcel A and
               in the well in the parking lot in front of Building  101.

Comment:     Lead contamination appears to be a problem at two sites SI-43 and SI-41.
               And I would like to see these areas addressed in the RI/FS, and I would
               like to know what action the Navy intends to take on those alleged
               contaminated sites.  I understand that the Investigation by Excavation
               covered these areas with soil, but in most cases only a couple of feet of
               clean soil is put over these contaminated areas. And we are concerned
               that,  as the site is developed and graded and rearranged to put buildings
               on it, that these areas will be exposed to the air, exposure with children
               and gardens and that sort of thing.  They won't remain covered forever,
               that is the point.
Response:     Lead is not a problem at sites SI-41 or SI-43.  These sites were investigated
              by the technique of investigation by excavation.  This process reduced the
              levels of contaminants at the sites.  Lead concentrations detected in soils at SI-
              41 and SI-43 are presented in the Parcel A SI HHRA. Lead was detected in
              seven soil samples left in place ranging from 9.1 to 186 mg/kg at site SI-41.
              Lead was detected in 34 soil samples left in  place ranging from 0.26 to  311
              mg/kg at site SI-43.  Based on the health protective level  developed using an
              EPA methodology and comparison to EPA Region IX PRGs, the
              concentrations of lead detected at SI-41 and  SI-43 do not pose a risk to human
              health and the environment.
                                      A-9

-------
Written Comments Received at the Public Meeting

Comments from an individual from the Bayview Hunters Point neighborhood.

1       Comment:     Is there any way to speed up the process? So many issues are to be
                      resolved, and time is of the essence.  When???

        Response:     In an effort to accelerate the cleanup process, the Navy has formed a BRAC
                      Cleanup Team  (BCT) comprised of Navy, EPA, and DTSC representatives.
                      The BCT is continually looking for ways to accelerate the  investigation and
                      cleanup process.  The purpose of the BCT is to accelerate  cleanup by
                      including the agencies in virtually every aspect of planning and execution of
                      the cleanup process. The Navy has requested that the agencies participate in
                      the preparation of documents to help minimize the number of comments and
                      promote cooperation in the cleanup process, which should  shorten the cleanup
                      program. However, the cleanup process is not a rapid process^  By law,
                      many steps are required to ensure that  human health and the environment are
                      adequately protected.  Nevertheless, when possible,  the BCT will continue  to
                      expedite the process by, for example, reducing document review times. The
                      Navy and the agencies have recently renegotiated the FFA  schedules with the
                      intent of speeding up the cleanup process.

Comments from Mr.  Richard Hiett, the California Regional Water Quality Control Board.  These
comments were read into the public meeting transcript and  received in writing in a letter  from the
DTSC and RWQCB dated July 28, 1995, from Mr. Cyrus Shabahari of DTSC to Mr. William
Radzevich of the Navy.
1      Comment:    As described in the Summary of Proposed Alternatives, it is unclear if
                     monitoring wells will be abandoned (closed) in both alternatives or only in
                     Alternative 2.  Both alternatives should properly close all monitoring wells
                     that will not be in service.  Further clarification is required.  The costs
                     associated with well closing are nominal in comparison to the overall
                                            A-10

-------
                                  project and should not be the reason for alternative selection. Therefore
                                  the difference in these "alternatives" appears to be the deed notification.

                   Response:     This RWQCB comment refers to the draft Parcel A RI/FS report.  In the draft
                                  version of the report an FS was included which had two no action alternatives,
                                  as mentioned above.  Following EPA guidance on preparation of a Record of
                                  Decision (ROD), only one no action alternative is discussed in the proposed
                                  plan for Parcel A. Closing of the wells was only considered in Alternative 2
                                  in the draft Parcel A RI/FS report. The FS was deleted from the draft final
                                  Parcel A RI report after the Navy received concurrence from the agencies that
                                  it was not necessary.

                                  The Navy will discuss with the future owner the option to use  the wells for
                                  monitoring. If the wells are not transferred, the Navy will abandon them in
                                  accordance with applicable  regulations prior to transfer of Parcel A. At
                                  present, the wells are covered and locked  to prevent tampering with them.

                                  The cost of closing the wells was not a major  consideration for selecting
                                  Alternative 1.  As noted, the deed notification is the major difference between
                                  Alternatives 1  and 2.

                   Comment:     Board staff have previously discussed property transfer concerns and deed
                                  notification requirements,  for the residual motor oil pollution in
                                  groundwater, with Navy staff and their  consultants.  Board staff concur
                                  that based on the level of effort expended in these investigations and the
                                  type of pollution found, the concentrations of motor oil detected in
                                  groundwater within the Parcel A bedrock does not require further
                                  investigation,  remediation or groundwater monitoring.  However, as
                                  stated in the draft RI, the groundwater at Parcel A is not well
                                  characterized due to the inherent complexities within the bedrock
                                  formation.  Because of these complexities Board staff have always
                                  maintained that deed notification should be included as part of any no
                                                        A-ll
j

-------
i
 i
j
                     action alternative for Parcel A. The purpose of a deed notice is to alert
                     potential buyers and developers. It is not intended to thwart development
                     or stigmatize the property. Disclosure of past and present environmental
                     problems is part of the most, if not all, real estate transactions. HPA is
                     no exception.  Board staff are available to work with the City and Navy
                     staff to  draft acceptable language that meets all parties needs.

       Response:     The RWQCB concurred with the Navy that motor oil detected in groundwater
                     within the Parcel A bedrock does not require further investigation,
                     remediation, or groundwater monitoring. The Navy will work with the
                     RWQCB staff to negotiate and draft  language that would be acceptable to all
                     parties concerning deed notification for the  motor oil in groundwater at Parcel
                     A for the real estate transfer process.

Other Written Comments Received During the Public Comment Period

Comments from Ms. Amy Brownell, City and County of San Francisco Department of Public Health.

1      Comment:     We have reviewed the draft final proposed plan for Parcel A and have the
                     following comments. As proposed  by the Navy, the difference between
                     the "no  action" alternative versus a "limited action" alternative (as
                     described in the Parcel A RI/FS) is the deed notification and the
                     abandonment (closing) of wells on Parcel  A.  The Navy should properly
                     abandon the wells on Parcel A regardless of the decision it makes  for the
                     proposed plan and the well abandonment should not be part of the
                     proposed plan decision.  The proper abandonment of all wells on Parcel A
                     should be considered part of completing the environmental cleanup and
                     properly closing the site. Contaminated sites under the oversight of the
                     Department of Public Health are issued final closure notices only when
                     well abandonment has been completed, as required under California Well
                     Standards, Bulletin 74-90.  These standards should be considered an
                     ARAR for the Navy on Parcel A.

                                           A-12

-------
                                 The well abandonment should not be a factor in the proposed plan,
                                 because it has no impact on environmental contaminants or exposures.
                                 The wells themselves are not contributing to or reducing environmental
                                 contaminants or exposures, they are just a way to monitor and take
                                 samples of the groundwater. If left in place, wells can become conduits
                                 for further groundwater contamination (e.g., if someone accidentally
                                 pours something down the wells) and therefore are required to be
                                 properly removed in order to complete closure of a site. The only  reason
                                 to consider leaving the wells in place is if the San Francisco
                                 Redevelopment Agency (SFRA), as part of the reuse planning, is
                                 interested in keeping and reusing these wells on the property. The Navy
                                 should discuss this issue with the SFRA.

                   Response:     The Navy will discuss with the future owner the  option to use the wells for
                                 monitoring.  If the wells are not transferred, the  Navy will abandon them in
                                 accordance with applicable regulations prior to the transfer of Parcel A.

                   Comment:     As far as the deed notification is concerned, we understand from the
                                 Regional Water Quality Control Board's (RWQCB) comments of July 27,
                                 1995, that the RWQCB has  requested that deed notification be included as
                                 part of the Navy's proposed plan.  RWQCB staff also stated that they will
                                 work with City and Navy staff to draft acceptable language that meets all
                                 parties needs. The Navy should consult with the SFRA and the City
                                 Attorney to  draft deed notification language that will be acceptable to all
                                 parties.

                   Response:     The Navy will work with the RWQCB,  SFRA, and San Francisco City
                                 Attorney staffs to negotiate and draft language  that would be acceptable to all
                                 parties concerning deed notification for the motor oil  in groundwater at Parcel
                                 A  for the real estate transfer process.
                                                       A-13
j

-------
 3      Comment:     In addition to these comments about the overall proposed plan, we have a
                      concern with the statements on page five concerning the risks from
                      ingestion of fruits and vegetables. An example is given comparing the
                      risk to that of a child eating 30 pounds of fruits and vegetables grown at
                      the site each year. If you are going to have such an example you should
                      describe why this scenario is unlikely or why it is not of concern and give
                      a comparison of the amount of fruit and vegetables that an average child
                      eats per year.

        Response:     Under EPA guidance, risk assessments are generally conducted using both
                      reasonable maximum exposures (RME) and average exposures. The HHRA
                      for Parcel A was conducted using only a RME scenario which assumes the
                      highest exposure that is reasonably expected to occur at a site.

                      Using RME exposure parameters, a child is assumed to consume 30 pounds of
                      fruits and vegetables per year, 12 pounds of fruits and  18 pounds of
                      vegetables,  grown at the site. The RME assumption overestimates the hazards
                      because a garden in a residential  plot in San Francisco  is not expected to
                      produce enough fruits and vegetable for a child to consume such quantities.  If
                      average exposure factors were used to estimate risk, the amount of home-
                      grown produce that is consumed  is estimated to be 1.2  pounds of fruit and 1.8
                      pounds of vegetables, or an order of magnitude less than the exposure
                      parameters used in the HHRA.  Using these parameters, the carcinogenic risks
                      and noncarcinogenic hazards associated with the ingestion of home-grown
                      produce would fall below EPA's  acceptable level.

Arc Ecology had two broad areas of concern:  residual contamination at five of the nine Site
Investigation (SI) and Remedial Investigation (RI) sites and poor characterization of issues concerning
the parking lot spring.  These comments, and the Navy's responses to these comments, are presented
below.
                                            A-14

-------
Comment:     Arc supports prompt transfer of clean properties that maximize reuse
              options to the City of San Francisco. Since the City of San Francisco
              anticipates that Parcel A will be redeveloped for residential purposes, it
              seem only prudent that all of Parcel A be cleaned to residential standards.
              The Navy must ensure that filled areas remain protective of health, even
              when uncovered as a result of site grading and excavation for new
              foundations during planned reconstruction.

              Arc supports remediation that protects the health of potential users and
              honors their concerns over the long term.  Residents of the Hunters Point
              neighborhood continue to express concern about contamination in the
              area.  That the San Francisco Department of Health conducted a study in
              1995 to compare incidence of cancer in the Bayview Hunters  Point
              neighborhood to those in the San Francisco Bay Area largely in response
              to residents' concern over possible exposure to harmful chemicals shows
              that people in the community take seriously threats to their health
              resulting from local contamination.  Potential Parcel A residents ought to
              feel confident that they  will be able to live in their new homes, allow their
              children to play, garden, and eat their homegrown vegetables without fear
              of illness or shortened lifespan resulting from residual  contamination.

              Arc Ecology finds little evidence to support "no action11 as the appropriate
              remedial action alternative for Parcel A.  The information presented in
              the Navy's Draft Final Proposed Plan for Parcel A, Hunters Point Annex,
              and supporting documents, do not support the Navy's contention that all
              of the nine Site Investigation (SI) and Remedial Investigation (RI) sites
              indeed "do not pose a threat to human health or the environment."

              The Navy reports in the RI document:
                     hazard indices 1.4 to 36 times above health-protective standards
                     for children exposed to soils given a residential exposure scenario
                     at sites SI-19, SI-41, SI-43, SI-50, and IR-59 JAI
                                    A-15

-------
                                 •      hazard indices 2 to 100 times above health-protective standards for
                                        vegetable consumption for both children and adults at sites SI-19,
                                        SI-41, SI-43, IR-59, and IR-59 JAI
                                 •      soil lead contamination above California-modified Preliminary
                                        Remediation Goals at sites SI-41 and SI-43
                                 •      cancer risk of 2 x 103 at IR-59-JAL  Generally risks below 10~* to
                                        10"6 are  considered protective of human health by the
                                        Environmental Protection Agency.

                                 We based our comments on information presented in the DRAFT Parcel
                                 A Remedial Investigation/Feasibility Study Report, Dated June 30, 1995.
                                 We understand that PRC intends to substantially revise this report before
                                 producing the Draft Final RI/FS.  This, too, causes us to question the
                                 appropriateness of proposing  "no action'1 at this time.

                                 Since the remaining contaminated areas are small compared to total
                                 Parcel A acreage, Arc sees no reason why cleaning these sites to
                                 residential standards should delay transfer of title to the City, or for that
                                 matter delay redevelopment efforts.  In the meantime, before full cleanup,
                                 the Navy should post warnings and restrict activities on the still-
                                 contaminated SI/RI sites until they indeed pose no threat to human
                                 health.

                   Response:     The Navy would like to emphasize that residual soil contamination at Parcel A
                                 does not pose a risk to human health and the environment.  The no action
                                 alternative was selected for Parcel A based on conclusions drawn from an
                                 investigation conducted to determine the nature and extent of chemicals of
                                 concern and the  HHRA.  The Parcel A RI HHRA was prepared using a
                                 methodology developed by the  EPA for the residential scenario.  The
                                 conclusions of the HHRA indicate that the Parcel A sites are protective of
                                 human health for a residential scenario.
1
1
                                                       A-16

-------
 i
j
                                  As discussed below, because of the conservative assumptions used in risk
                                  assessments, the hazard indices (HI) and carcinogenic risks (CR) are often
                                  over estimated.  For example, His were probably overestimated because of the
                                  assumptions on which the calculations were based.  First, the HHRA assumed
                                  that chemicals were spread evenly throughout the site. In fact, most
                                  chemicals of potential concern are extremely localized and are primarily
                                  located beneath 0.5 to 5.5 feet of clean soil.  Second, because organics were
                                  detected in relatively few samples (less than 10 percent), the maximum
                                  detected value was used in the HHRA. Accordingly, because the maximum
                                  detected value was used, the risks and hazards for these organic chemicals is
                                  overestimated.  Third, for the inorganic chemicals of concern detected above
                                  ambient concentrations in at least one  sample, the exposure point
                                  concentration of these inorganics were used in the risk calculations.
                                  Manganese and chromium were detected above their ambient concentrations in
                                  less than 10 percent of the samples and were therefore included in the risk
                                  calculations.  Because manganese and  chromium are present largely at ambient
                                  concentrations, the risks and hazards calculated overestimate risks  to human
                                  health.

                                  In addition,  the use of EPA Region IX PRG toxicity factors for manganese
                                  and chromium — two of the primary risk drivers - overestimate the risk
                                  related to the ingestion of home-grown produce.  For example, the toxicity
                                  factor used for manganese was 0.005 which was developed for the ingestion
                                  of manganese through drinking water. A more appropriate toxicity factor for
                                  the ingestion of manganese through food is 0.14 — a difference of
                                  approximately 2 orders of magnitude.  Using the 0.14 toxicity factor, the
                                  hazard due to manganese would fall well below EPA's acceptable risk levels.
                                  Chromium was evaluated assuming that chromium is present as chromium VI.
                                  In general, chromium in soils is present as either elemental chromium or
                                  chromium III. Using the toxicity factor for chromium III (1) rather than the
                                  toxicity factor for chromium VI (0.005) would reduce the hazard by at least 2
                                                         A-17

-------
                                orders of magnitude. Therefore, the hazards associated with chromium would
                                be well below EPA's acceptable level.

                                For information concerning lead concentrations see oral comment and
 I                               response from ARC Ecology Comment 5.

 I                               Finally, although the future residential risk was calculated to be 2 x 10"3 in
                                the RI, this CR overestimates the actual site risk for several reasons. The CR
                                is primarily driven by chromium, benzo(a)pyrene, and heptachlor.  The
                                chromium risk was calculated on the assumption that chromium is present at
;j:j                               chromium VI. In general, chromium in soil is present as either elemental
•3                               chromium or chromium III.  Using the PRO for total  chromium (which is
 I                               more  representative), the total estimated CR at IR-59 JAI under the residential
 I
 J                               use scenario is estimated to be 7 x 10"6, which is within EPA's acceptable risk
 .                               range. Accordingly, under a residential use scenario,  no significant
. j
 j                               carcinogenic risks are expected  from exposure to IR-59 JAI soils.
 1
 j                               The draft final Parcel A RI report was revised to incorporate comments from
                                the EPA, Cal/EPA,  RWQCB, and ARC Ecology.  The Navy, with
 I                               concurrence from EPA and Cal/EPA, has determined  that no action is
                                required at Parcel A because current site conditions are protective of human
 I
                                health and the environment.  Therefore, the Navy is preparing to transfer the
                                parcel in mid-1996.
 j
           2      Comment:     The parking  lot spring area presents Arc with another source for concern.
                                One water sample collected at the spring showed motor oil contamination.
                                Although the Draft RI/FS gives little reason to suspect that groundwater
 1                               contributes to contamination around the spring.  Arc believes it is too
                                early  to conclude that contamination in or around the spring poses no
I                               threat to human health or the  environment.  Was this contamination an
~m
                                isolated incident?  If not,  where is  the motor oil coming from? Could the
                                spring offer a pathway for contaminants to enter the groundwater? Is the

                                                      A-18

-------
 j
j
                                  area biologically sensitive?  Arc requests that access by children to the
                                  spring be restricted, that the area be protected from development, and
                                  that a program of quarterly monitoring be maintained until these
                                  questions are answered.

                   Response:     The presence of total petroleum hydrocarbons as motor oil in groundwater has
                                  only been observed in isolated areas on Parcel A. The water samples
                                  collected from the spring contained concentrations of motor oil ranging from
                                  250 pgll to 600 /ig/1; the source of motor oil is  unknown.  The spring, which
                                  is located in the middle of a parking lot, is not in an environmentally sensitive
                                  area.  Because the spring is present only occasionally, it is not  believed to act
                                  as a pathway for chemical transport. Based on these factors, the Navy, with
                                  concurrence from the EPA and RWQCB, has concluded  that the
                                  concentrations of total petroleum hydrocarbons as motor oil detected in
                                  groundwater within the Parcel A bedrock do not pose a threat to human health
                                  or the environment,  or require further investigation, remediation, or
                                  groundwater monitoring.
                                                         A-19

-------

-------

-------

-------