INNOVATIVE  METHODS  OF MANAGING
     ENVIRONMENTAL  RELEASES
           AT  MINE SITES
              April  1994
        U.S. Environmental Protection Agency
             Office of Solid Waste
             Special Wastes Branch
               401 M Street, S.W.
             Washington, D.C. 20460

-------
                            Innovative Methods of Managing Environmental Releases at Mine Sites
                         DISCLAIMER AND ACKNOWLEDGEMENTS

                This document was prepared by the U.S. Environmental Protection
                Agency (EPA).

                The mention of company or product names is not to be considered an
                endorsement by the U.S. Government or the U.S. Environmental
                Protection Agency (EPA).
\
t

-------
                     Innovative Methods of Managing Environmental Releases at Mine Sites

                           TABLE OF CONTENTS
                                                                     Page
1.0 INTRODUCTION  	  1

2.0 SOURCE REDUCTION  	  3
2.1 FLOTATION PROCESS CONTROL 	  3
      2.2 PYRITE FLOTATION  	  17
      2.3 METAL CLEANING TECHNOLOGY	  27

3.0 RECYCLING	  32
      3.1 SLAG REPROCESSING	  32
      3.2 TAILINGS REPROCESSING OPERATION	  45
      3.3 PIPE RECYCLING/REUSE	  57
      3.4 RECYCLING MINE TIRES	  69

4.0 OTHER PRACTICES	  79
      4.1 WATER MANAGEMENT AT MINE SITES  	  79
      4.2 CYPRUS BAGDAD POLLUTION PREVENTION PLAN	  99
                                         U.S. Environmental Protection Agency
                                         Region 5, Library (PL-12J)
                                         77 West Jackson Boulevard, 12th Floor
                                         Chicago, IL  60604-3590
                                    n

-------
                           Innovative Methods of Managing Environmental Releases at Mine Sites

                                    LIST OF TABLES
                                                                                       Page

Table 1.  List of Measured Variables Monitored by the System at ASARCO's Sweetwater
         Mill	   12
Table 2.  Copper Values from Slag at San Manuel  	   35
Table 3.  IMC Inventory of Pipe In Use or Available,  July 1992	   59
Table 4.  Sizes and Uses of Pipe by  IMC	   60
Table 5.  Size and length of matrix pipelines (September 1992)  	   61
Table 6.  Hayden Hill Control Measures  	   83
Table 7.  Cyprus Bagdad Control Strategies  	   87
Table 8.  Costs of Drainage Management Systems for  Construction Sites	   89
Table 9.  Sediment and  Erosion Control Costs	   90
                                    LIST OF FIGURES
                                                                                       Page

Figure 1.  Doe Run Fletcher Flow Diagram Showing Location of Process Control
          Measurements	  6
Figure 2.  Fletcher Mill Daily Report  	    10
Figure 3.  Map of the Superior Mine and Mill	    18
Figure 4.  Pyrite Flotation Circuit Flowsheet	    22
Figure 5.  Location Map  	    33
Figure 6.  Process Flow Diagram for Slag Cooling	    37
Figure 7.  Flotation Operation Flow Diagram	    38
Figure 8.  Pinto Valley Miami Unit, Location  Map	    46
Figure 9.  Pinto Valley Miami Unit, Process Flow Diagram	    48
Figure 10. Pinto  Valley Miami Unit, Computer-Controlled Tailings Reprocessing Operation
           Instantaneous Flow Rates	    49
Figure 11. Pinto  Valley Miami Unit, Copper Cities  Deep Pit Well and Seep Locations	    51
                                             111

-------
                            Innovative Methods of Managing Environmental Releases at Mine Sites

        INNOVATIVE METHODS OF MANAGING ENVIRONMENTAL RELEASES
                                      AT MINE SITES

1.0  INTRODUCTION

As a National policy, the Environmental Protection Agency (EPA) is integrating the concept of source
reduction and recycling  in many of its activities.  Both the Resource Conservation and Recovery Act
(RCRA) and  the Pollution Prevention Act of 1990 (PPA), encourage the reduction in volume, quantity
and toxicity of waste.  While RCRA focuses primarily on the reduction in volume and/or toxicity of
hazardous waste, the PPA encourages maximum possible elimination of all waste through source
reduction.

In addition to source reduction and recycling, environmental improvement may come from the
development  of new and innovative ways to manage wastes and prevent releases.  Recognizing that
unique issues are associated with the mining industry, such as large volumes of raw materials used
and waste generated, EPA has prepared this report to describe source reduction and recycling
practices and innovative techniques for waste management currently used in mining.  Many of these
practices may, in addition to their environmental benefit, realize significant cost savings. It is EPA's
intent to identify these practices and foster technology and information transfer throughout the mining
industry.  In  addition,  the  Agency is seeking additional sites where new and innovative practices or
technologies are currently  being implemented.

In the Pollution Prevention Act of 1990, Congress defined source reduction as any practice that:

       (i) reduces  the amount of any hazardous substance,  pollutant, or contaminant entering any
       waste stream or  otherwise releases into the environment (including fugitive emissions) prior to
       recycling, treatment, or disposal; and

       (ii) reduces the hazards to public health and the environment associated with the release of
       such substances, pollutants, or contaminants.

       The term includes  equipment or technology modifications, process or procedure
       modifications,  reformulation or  redesign of products, substitution of raw materials, and
       improvements  in housekeeping,  maintenance, training, or inventory control.

According to the statute, "source reduction does not include any practice that alters the physical,
chemical, or biological characteristics or the volume of a hazardous substance, pollutant, or
contaminant through a process or activity which itself is not integral to and necessary for the
production of a product  or the providing of  a service."

-------
	   Innovative Methods of Managing Environmental Releases at Mine Sites

This report is organized into the following sections:

       Source Reduction,
       Recycling,
       Other Practices.

In the context of non-coal mining  (extraction and beneficiation), source reduction can include process
control to produce a purer product while reducing hazardous constituents in a waste stream (Process
Control at DOE Run and ASARCO) and production of a new saleable product while reducing
hazardous constituents in a waste stream (Pyrite Flotation at Superior Mine). Each of these practices
reduces the amount of a hazardous substance being released to the environment and is integral to
production of a product.  Although the overall reduction of hazards to public health and the
environment is not easily measured, improvement is at least incrementally positive in nature.  The
section on metal  parts washing also presents source reduction opportunities.

Recycling opportunities unique to mining include slag reprocessing at San Manual, tailings
reprocessing at Pinto Valley and pipe recycling at an IMC Phosphate mine in Florida. Recycling
opportunities that are more generic include used oil burned for energy recovery and tire recycling,
although  these may have  unique implementation considerations at mine sites. The "Other Practices"
section addresses topics of a more general nature and includes a description of best management
practices for water management and the facility pollution prevention plan prepared by the Cyprus
Baghdad  Mine. Each of  these practices may present a better alterative to simple disposal of wastes
and, in addition to reducing the threat to human health and the environment, may result in substantial
cost savings to industry.

In preparing these reports, EPA collected information from site visits to specific facilities,
conversations with interested  parties, and from publicly available documents.  EPA has not conducted
an independent verification of the data. Detailed economic analyses were not obtained due to
confidential business information concerns. Each of the subsections of this report were released as
separate reports for comment and have been revised accordingly.  These reports were first presented
to the public at the Pollution Prevention Conference held in Snowmass, Colorado in August, 1993.
Two reports initially prepared as part of this effort have not been included in this compendium.  EPA
found that utilization of used  oil in ANFO is not currently practiced, therefore this report has not
been presented here.  In addition, a report on the INCO cyanide treatment process was prepared; this
report has been integrated into another draft report on treatment methods for cyanidation wastes.

To assist with technical questions and issues,  a list of technical contacts familiar with each technology
is provided, however, this listing  is not to be considered an endorsement by the U.S. Government or
the U.S.  Environmental Protection Agency (EPA).

-------
                            Innovative Methods of Managing Environmental Releases at Mine Sites

2.0 SOURCE REDUCTION

2.1 FLOTATION PROCESS CONTROL

An automatic process control system can be defined as any arrangement of sensors, computing
elements, and  control units designed to minimize the difference between the observed and desired
behavior of the process in question.  In general, the operator specifies the desired values of process
variables as a set of setpoints, and the sensors measure the current values of those same variables as a
set of numbers describing the state of the process.  The differences between the setpoints and the
current state are known as the variances.  The computing elements  in the control system attempt to
minimize the complete set of errors by altering the positions of valves, changing the speeds of
motors, or manipulating other variables which may affect the state of the process.  Controllers may be
as simple as a float valve, which reduces the flow of liquid to a tank as it approaches the desired
level. Alternatively, they may involve a host of sensors feeding information to one or more
computers which interpret the observed state of the system via detailed models before deciding on  a
set of appropriate responses.  Simple control schemes are usually reliable and  easy to maintain.
However, they cannot provide the sorts of optimum response to plant-wide upsets that are required in
process  industries today.  The level of control obtainable from a control scheme is generally related to
the level of process knowledge incorporated into its design.  This report focuses on the application of
relatively advanced process control technology to mineral flotation.

Application to Flotation Mills

Flotation mills separate metalliferous minerals from waste rock (gangue) by causing finely  ground
mineral particles to float  to the top of a frothing bath of aerated ore slurry.  Surfactants are used to
cause air bubbles to attach themselves to the valuable minerals, but not to the  gangue. Froth from the
final stage of a cascade of floatation cells is dewatered to produce an ore concentrate, which is
shipped to a smelter. The goal of flotation mill operators is twofold; they must maximize the amount
of material  floated to the concentrate, while simultaneously minimizing the concentrate's gangue
content.  In addition, many of the major resource suppliers have stated their intention of improving
environmental quality (e.g., The Doe Run Company, 1987). In order to meet this commitment, the
mill operators must also minimize the amount of surfactants and heavy metals in the waste stream  fed
to the tailings  pond.  Parameters that may be varied in order to achieve this goal include the rate of
addition of surfactants, the rate of sparging of air into the flotation cells, relative pumping  rates of
overflow and recycle streams within the cascade, and the particle size distribution  in the incoming ore
slurry.  The problems of control are compounded when the ore contains more than one valuable
mineral and each must be separated from the others and from the gangue to form a high-purity
concentrate. Reliable on-line measurements of metals content at various points throughout the mill is
necessary in order to effect control of the operation.

-------
	Innovative Methods of Managing Environmental Releases at Mine Sites

X-Ray Fluorescence

X-Ray Fluorescence (XRF) is an analytical technique designed to rapidly measure the metals content
of a sample.  When atoms of the heavier metals are bombarded with X-rays, electrons lying in low
orbitals close to the nucleus may be ejected.  Electrons from the outer shells will jump to fill the
gaps,  emitting radiation in the form of X-rays.  Radiation emitted by electrons in these high-energy
transitions is characteristic of the atom and is essentially unaffected by the atom's chemical
environment.  In a XRF analyzer, the intensities of the emitted X-rays are measured  by  spectrometers
coupled to diffracting crystals.  One crystal/spectrometer assembly is provided for each  metal to be
measured.  A typical arrangement for an analyzer in a lead-zinc mill would include assemblies for
lead, zinc, copper, and iron.  Excitation of the sample is provided  by an X-ray tube incorporated in
the analyzer. When slurry samples are to be analyzed, the  sample is passed through a sample cell.
Since fluorescence is a surface phenomenon, the sample cell is designed to induce thorough mixing  so
that the average metal content determined  over the measuring period is characteristic of the bulk
sample.

In industrial X-ray analyzers, sample lines are constructed to bring slurry samples from various parts
of the mill to the analyzer.   A sequencer within the analyzer causes the machine to switch from one
sample to the next every 1-2 minutes.  The switching may be done by opening valves to feed the
desired slurry sample through a single sample cell, or by causing the analyzer unit to move along a
line of sample cells depending on the analyzer used.  Output from  the analyzer is in  the form of a
digital electronic signal, suitable for input to a computer.  Units of this type are marketed in North
America.

Evolving Level of Control

In flotation mills without X-ray analyzers, mill operators typically collect slurry samples from
flotation cells by hand.  They then swirl each sample in a pan similar to those used by gold miners  to
remove the lighter constituents.  Visual inspection of the minerals  left behind gives them an indication
of the mineral content and the particle size.  Armed with this information, they can manually adjust
surfactant addition rates and other parameters in order to meet their operating goals. This approach
to process control has the advantage of requiring the operators to become intimately familiar with the
characteristics of the ore and the behavior of the mill.  Over time, the operators collectively become a
valuable repository of process information, not all of which can easily be quantified.

In mills with on-line X-ray analyzers, operators  can base their responses to process upsets on absolute
determinations  of the metals content of each stream sampled.  In the simplest scheme, the operator
reads the output from the analyzer, which is generally updated every 10-15 minutes, and uses that
information together with readings from flowmeters and level gauges in making manual adjustments
to valve settings and motor speeds. Few, if any, mills with X-ray analyzers operate in  this manner.
In most cases, the operators establish setpoints for low-level controllers which regulate  flowrates and

-------
                            Innovative Methods of Managing Environmental Releases at Mine Sites

levels as desired. In the next stage of development, the low-level control loops are implemented in
software by a central process control computer, which also provides a visual display of the state of
the mill.  This level of control is the focus of this section of the report.  At the present time, some
mills are moving to a more advanced approach in which the central computer uses historical data
and/or a detailed model of the total process to establish new setpoints automatically. This  is typically
referred to as an expert system.  The operator may override the computer when necessary, or may
alter the process model.  The same sequence of developments has occurred in many other sectors of
industry, including power generation, oil refining, and chemical manufacturing.

A large number  of companies market process control hardware and software for a variety of
applications. X-ray analyzers can be interfaced with hardware from most of these companies.  Some
purchasers may appreciate the possibilities made available by buying components from more than one
company.  Others may prefer to purchase an integrated package from a manufacturer that specializes
in mining applications.

Review of Current Implementation

Figure 1 shows the main features of the control scheme implemented at the Doe Run Fletcher mill.
The arrangement reflects the mill circuit as of November, 1992.  The facility beneficiates a mixed
sulfide ore that averages 5.5% galena (PbS), 1% sphalerite (ZnS), and 0.3% chalcopyrite (CuFeSj).
Gangue minerals include dolomite, calcite, pyrite, and marcasite.  The ore is extracted by
underground mining, and lead content may vary by  50%  over a short period of time.  The mill has
only one ore feed from the mine to the grinding  circuit, providing limited buffering of variations in
mine output. The flotation system must therefore be capable of adjusting rapidly to cope with
substantial changes in feed composition.

Coarsely crushed ore from the underground primary crusher is stored in a single ore bin on the
surface.  Ore from the bin is fed to a secondary cone crusher.  The temperature inside the  crusher,
the pressure on the cone, oil pressure, and electric power consumption are monitored to ensure that it
is operating within its mechanical limits. Crushed ore is  fed to a rod mill, together with water and
flotation reagents. The  flotation reagents introduced at this point are a xanthate collector to float
sulfide minerals, zinc  sulfate (ZnSO4) to depress sphalerite (ZnS), and sodium cyanide (NaCN) to
depress pyrite (FeS).  The rate of addition of these components is monitored by flowmeters on each
line and controlled by pneumatically  driven valves.  Each valve is connected to a pressure/current
(P/I) converter, which receives a 4-20 mA analog signal from the process control computer.  Output
from the rod mill goes to a cyclone.  Oversize material falling through the cyclone is reground in a
ball mill.  Material leaving the grinding circuit averages 53 % < 200 mesh.  This stream passes
through a nuclear density gauge and a particle size monitor before entering the first flotation unit.  A
sample of this slurry is drawn off every 10 minutes  and fed automatically to a XRF analyzer.

-------
                            Innovative Methods of Managing Environmental Releases at Mine Sites
       Or* Bin
    levels arc msjnta^od by
on each set of eatfa. as molested. Al
measurements are fed to the Proacene) system.
which controls the flow of reagents. Pumps and
other etectncstfy dnven units (not shown) are
controlled by an AUcn-arsdey motor central pan*.
Assay samples taken at the mooted poma arc fed
to the Couner 30 X-ray fluorescence (XNF) urn for
real-time analys*.  XMF data is sent to the Proscon«
system.
                        Crwher                              cydcne  |~H

                       3|	1          tfatt>                     \/
Figure 1. Doe Run Fletcher Flow Diagram Showing Location of Process Control Measurements

-------
       Innovative Methods of Managing Environmental Releases at Mine Sites
                        Control v*vt
Omrty
T«npcntur«
                      Soolum •opropy iimtwtt
01 flow
Motor
                  |^y  MtKnyf
                  (J)  Mhi«« tfcoM (C, to <;)
                  (D
Ammonfeud eupnc cNondt
Myortttdlm*
Sutt*
Stireh
                                                      Soolum detvomatt
                Figure 1, Continued.

-------
                            Innovative Methods of Managing Environmental Releases at Mine Sites

The feed slurry is fed together with a frothing agent to the lead rougher cells. Air is sparged into the
cells from below.  The lead rougher consists of two sets of three cells; each set has its own pulp level
control.  In each of the two control loops, pulp level is monitored by a float.  The position of this
float is input to a simple Proportional-Integral-Derivative (PID) controller, which adjusts the position
of a dart valve within the cells.  The tailings stream leaving the lead rougher is assayed by the XRF
analyzer.  The froth collected in the launder is fed to a lead cleaner and recleaner cells.  The cleaner
is equipped with pulp level control, but the recleaner is not (pulp level control is to be added to the
recleaner in the future).  Tailings from the cleaner are recycled to the rougher.

Overflow from the recleaner launder is piped to a lead-copper absorber unit.  Sulfur dioxide, starch,
and caustic soda are added at this stage to depress the floatation of galena while allowing the
chalcopyrite to float in the copper circuit. The copper circuit is run as warranted to separate
chalcopyrite from galena.  Slurry leaving the absorber is fed to the copper rougher.  Overflow from
this unit is piped to the copper cleaner and thence to the recleaner.  Each of these units has automatic
pulp level control.  Sodium dichromate  is added between the cleaner and recleaner to depress galena.
The tailings stream from the copper rougher is assayed by the XRF analyzer before entering the lead
thickener.  In the thickener, the suspended solids settle out to form a lead concentrate.  A level
indicator and a torque indicator are mounted on the  shaft of the thickener rake. The level indicator
gives some indication of the depth of settled material and  the torque indicator provides warning
should the rake begin to  seize.  The lead concentrate is dewatered on a rotary vacuum filter.  Filter
cake is collected in a bin which is mounted on a load cell. Froth leaving the copper recleaner is
similarly thickened and dewatered to produce copper concentrate.

The zinc flotation circuit is fed by tailings from the lead rougher.  Ammoniated cupric chloride is
added to activate the previously depressed sphalerite before the slurry enters the zinc rougher.
Frothing agent and additional collector are also added at this point.  Tailings from the rougher are
assayed by XRF and pumped to the tailings  pond.  The zinc circuit differs from the other two circuits
in that cleaning is performed by a pair of air-sparged column cells.  Differential pressure is measured
at three levels within each  of the cells.  The pH is monitored on the first column.  Lime may be
added to the rougher launder if the pH is too low.  Froth  from the second column is assayed before
being thickened and dewatered to form zinc concentrate.  Copper and zinc concentrates are produced
using the same filter.  Since copper is a minor  constituent of the ore, the filter is devoted to zinc
concentrate production for most of its operating hours.

Assay data from the XRF unit is sent to a process control computer.  Flowmeter readings  from all of
the reagent addition lines are also sent to the computer, as are the outputs from the panicle size
monitor on the grinding  circuit, the pH meter on the zinc circuit,  outputs from the thickener level
and torque indicators, and  the concentrate bin load  cells.  The computer also  receives signals
representing the position of the valves on each reagent line.  The computer displays most of this data
on an operator console in the mill control room. Based on the data presented, the operator can vary

-------
	Innovative Methods of Managing Environmental Releases at Mine Sites

the reagent addition rates to try to obtain a better separation among the minerals.  Warnings of
abnormal conditions are also displayed on the console.  An example of the computer printout for the
Fletcher mill from September 23, 1991, is presented in Figure 2.  The  report shows recoveries of
lead and zinc from the ore feed to be 97.22 percent, and 76.29 percent, respectively.  Because of the
low copper content in the feed assays, the copper circuit was not running on this day.  The computer
system maintains an archive of the systems's state as a function of time.  Electric motors, including
those on pumps and blowers throughout the mill, are controlled by a motor control center. With
appropriate controller cards, the computer could also be used to control the speeds of some of these
motors.  Where the historical behavior of the mill has been recorded and analyzed, mill managers can
specify empirical formulae relating reagent needs to assay results.

The ASARCO Sweetwater mine extracts a lead/zinc/copper ore similar  to Fletcher's mine. The mill
currently beneficiates only lead and zinc minerals, but is planning to add a copper circuit  in the near
future (the ore averages 0.3 to 0.4 percent copper).  The mill through put is 290 tons per hour
nominally, and operates four days per week. The Sweetwater mill has  two fine ore bins.   Each bin
has three feed hoppers  from which the mill selects ore.  This ability gives the operator more control
in preparing a uniform feed to the grinding and subsequent flotation circuits.  A more uniform feed to
the  flotation circuit improves recovery.  The system, with information from the XRF, provides
immediate warning of changes in  ore grade and allows the operator to respond by adding  or reducing
reagents as needed.

-------
                                  Innovative Methods of Managing Environmental Releases at Mine Sites

                                    Figure 2.  Fletcher Mill Daily Report
                                          (Source: The Doe Run Company)
                                                                                              DAV ENDING
                                                                                            24-SEP-91 06:30
             ROD MILL RUN TIME:     11.40     HRS
             TONS MILLED (WET):      2645     TONS
             MILLING RATE.           232.1     TPH
                                                 % OPERATING TIME:          47.5
                                                 % COPPER CIRCUIT ON:        56.0

FEED
PB CONC
ZN CONC
CU CONC
TAIL

%PB
6.07
81.07
3.89
4.14
0.21

ASSAYS
%ZN %CV
0.46
0.72
54.79
0.23
0.15

0.08
0.46
1.14
29.67
0.05

SFE
1.52
1.51
2.66
27.62
1.52

DRY TONS
PRODUCED
2566.1
170.2
14.5
0.0
2383.8
2568.6
%PB

97.22
0.37
0.00
2.46

RECOVERIES
%ZN %CU %FE

9.87
76.29
0.00
13.75


37.51
8.63
0.20
52.58


6.51
1.42
0.01
91.79

BACK CALCULATED
BULK CONC
ZINC FEED
81.32
0.66
0.62
0.46
0.45
0.06
1.39
1.53
7.3
102.7
TPH
TPH






PB REAGENTS

XANTHATE
ZNSO4
NACN
FROTHER-PB
cc/min
313
1151
58
60
Ib/ton
1.53
345.60
00083
0.061

3894
CUSO4
DICHROMATE
FROTHER-ZN
ZN REAGENTS
cc/min
12
108
484
37
Ib/ton
3.24
36.15
6.43
0.404

STARCH
DICHROMATE

pH/S02
CU REAGENTS
cc/min
4103
368

5.67
Ib/ton
2.51
0.56


                          MINIMUM ASSAYS
                                                            MAXIMUM ASSAYS

FEED
PB CONC
ZN CONC
CU CONC
TAIL
%PB
3.44
75.57
1.67
3.45
0.10
%ZN
0.11
0.34
48.86
0.20
0.03
%CU
0.04
0.09
0.67
29.12
0.01
%FE
0.43
0.96
0.58
27.47
0.82
%PB
9.46
82.77
7.02
4.15
1.90
%ZN
0.81
1.74
57.89
0.25
3.70
%CU
0.14
1.05
4.38
30.18
0.14
%FE
1.93
6.44
7.42
27.96
1.74
RECOVERIES
94.42
          26.40
0.00
0.00 TPH
                                                                    97.90
                                                              84.50
                                                                                         16.01
                                                                                                  264.2 TPH
COURIER 30       PB       ZN       CU       FE       SO
NORM FACTOR   0.9677     0.9832     0.9527     0.9800     0.9396
H2ODIAGNOS     17.3       10.9       5.8       7.3      68.7
                                                    PB       ZN      CU     FE       SO
                                                   1.0571     1.0544    1.0386   1.0413     1.0338
                                                    251.5      73.5      27.2    30.2     1380.7
                                                       10

-------
	Innovative Methods of Managing Environmental Releases at Mine Sites

Information provided by the ASARCO Sweetwater mill was limited due to Company proprietary
information.  Consequently, only information pertaining to integration with existing equipment and
inputs and outputs to the process control equipment are discussed here. Measured variables (inputs
and outputs) for the system are listed in Table 1.  When known, the type of sensor and manufacturer
are identified.  In addition to these variables, five samples are pumped to the XRF analyzer every  10
minutes.  The relative concentrations of metals are then sent from the analyzer to the system.  The
first sample is taken from the cyclone overflow before it inters the  lead circuit.  The second sample is
taken from the lead scavenger tailings prior to entering the zinc circuit. The third sample is from  the
second lead cleaner launderer.  The two remaining samples  for XRF analysis are taken from the
second zinc rougher tails and the third cleaner tail.  Two additional sampling points will be added
when the copper circuit comes on line.

Operational Requirements

Use of an on-line X-ray analyzer coupled with a process control computer greatly simplifies the
operation  of a mill.  One mill  required 24 operators, 3 engineers, and  3 supervisors before this
technology was introduced.  It now requires about 8 staff to operate.  Some additional skills are
needed to  use the new technology effectively.  The mill managers should have some familiarity with
the basic concepts of computer programming in order to be able to customize the software to their
best advantage.  The XRF unit is very reliable. From time to time, X-ray tubes will degrade and
must be replaced.  The mill will need to stock a variety of spare pans  for sensors and  control
elements.  Most of the electronic signals both to and from the computer are in analog form, and
maintenance of the wiring will not present any difficulty to an industrial instrument technician.

Costs and Benefits

Benefits associated with process control technology may  include the following:  1) a decrease in
reagent consumption as a result of rapid response in reagent addition rates in accordance with mill
feed grade and throughput fluctuations;  2) a stabilized process resulting in increases in the amount of
lead and zinc produced through higher metal recoveries (constrained by concentrate grade); and 3)
more effective grinding control which would allow an increase in mill  tonnage throughput (Jones
1991, Heitman, undated).  The reduced use of reagents is viewed as an environmental  benefit.
Further, since more metal is recovered using this system the ratio of waste to final product has been
reduced.
                                              11

-------
          Innovative Methods of Managing Environmental Releases at Mine Sites

Table 1.  List of Measured Variables Monitored by the System
              at ASARCO's Sweetwater Mill
                     (Source. ASARCO)
Description
Rod Mill Feed
Rod Mill Water (Fisher valve,
Honeywell flowmeter)
Sump Level (Mittronics)
Sump Water (Mittromcs Sonic Ear)
Flotation Feed Density (Texas Nuclear)
Lead A Tub Level
Lead B Tub Level
Zinc Tub Level
Lead Cyanide
Zinc Cyanide
Lead Xanthate
Zinc Xanthate
Lead Frother
Zinc Frother
Range
0-400TPH
0 - 750 GPM
0- 100 %
0 - 1500 GPM
32.0 - 47.0 % solids
0- 100 %
0 - 100 %
0- 100 *
0 - 1000 cc/min
0 - 300 cc/min
0-1920 cc/min
0 - 500 cc/min
0 - 200 cc/min
0-120 cc/min
Description
Copper Sulfate
Zinc Sulfate
Crusher Tonnage
Cyclone Feed Density (Texas
Nuclear)
Cyclone Feed Flow (Fisher Porter)
Particle Size (Autotromcs)
Parade Size (Autotronics)
Secondary Crusher Motor
Tertiary Crusher Motor
Rod Mill Motor
Ball Mill Motor
Cyclone Feed Motor
Final Tail Motor
Speed Hydrastroke
Range
0-2100 cc/min
0 - 6000 cc/mm
0 - 100 TPH
1.000- 1.875 S.G.
0 - 500 GPM
5 - 25 % 100 MES
0.0 - 55.0 % Solids
0-75 Amps
0 - 75 Amps
0 - 300 Amps
0 - 300 Amps
0 - 300 Amps
0 - 300 Amps
0 - 100 %
                            12

-------
                            Innovative Methods of Managing Environmental Releases at Mine Sites

Installation

Purchase and installation of the process control system for the Fletcher mill cost approximately
$600,000 in 1989. Only a limited amount of additional money was spent on training because many of
the staff had already worked with the system at the Buick mill. The actual installation was completed
by Doe Run personnel.

Integration with Existing Facility

The process control system at the Fletcher facility was installed between 1989 and 1990. The Doe
Run Company had gained experience with the use of X-ray analyzers and process control at their
Buick mill facility.  The Buick mill installed a computerized process control system in 1981,  using a
XRF unit and a computer system.  Construction of the control system at Buick required much time
and effort.  Once the Buick system was completed, transferral of the technology to the Fletcher mill
was relatively straightforward.

Operational Requirements

Prior to the installation of the control system, operation of the mill required 3 operators and 1 .
supervisor per shift.  Currently they are using 2 operators and  1 supervisor per shift.  The reduction
in staff needs was much more dramatic at Buick, where the mill is larger.  Other requirements, such
as energy, are negligible.  Doe  Run maintains a stock of parts for all their mill facilities on the Trend
totaling $200,000 to respond to equipment failures.  Most of these are sensor parts; the balance are
X-ray tubes and computer equipment.

Benefits

The.new control system has allowed Doe Run to obtain a better separation of metalliferous minerals
from gangue. This means, in principle, that lesser amounts of gangue and other wastes are being sent
to the smelter.  There is also a slight reduction in the average metal load disposed of in the tailings
impoundment. From the operators' point of view, the new system has made it easier to respond
smoothly to sudden changes in ore grade.  The main benefit perceived by the company is an
economic one: the metal concentrates are of higher purity than they were before the mill was
modernized.  Costs savings are summarized as follows:

       • Reduced reagent costs by 14 percent per year, saving $75,000,
       • Improved lead metallurgy by $100,000 per year,
       • Improved zinc metallurgy by $330,000 per year,
       • Improved copper metallurgy by $270,000 per year.

These amount to a total annual savings of $785,000 (Jones 1991). Savings in labor costs were not
identified.
                                               13

-------
                            Innovative Methods of Managing Environmental Releases at Mine Sites
Waste Reduction

Use of the control system has resulted in production of higher quality concentrates being sent to the
smelter.  Thus, by reducing the gangue content of the final concentrate, the volume of slag generated
at the smelter is reduced.  In addition, Doe Run estimates that the metal concentration in the tailings
waste stream was 0.2 percent before the process control system was installed.  The average metal
concentration in the tailings now is 0.15 percent.  This amounts to a reduction of 4,500 to 5,000
pounds of metal entering the tailings pond per day.

Limitations

The use of on-line XRF analysis and computerized process control will not necessarily solve all of a
mill's control problems.  The XRF unit determines the total content of each metal in a stream.  In
some cases,  the same metal may be present as two different minerals which behave differently in the
flotation cells.  Such a situation could occur in copper mines, where both sulfide and oxide ores are
encountered. It may be necessary to use another type of probe to obtain additional information about
the feed before determining the required dosage of reagents.

Future trends in flotation mill control seem to be in the direction of incorporating more and more of
the mill functions into  a centralized control scheme and toward the use of expert systems.  Many mill
owners who have invested  in a centralized control system initially configured it to control reagent
addition rates based on XRF assay data.  These are the most critical parameters affecting the flotation
process. Some of these owners are now planning to add additional control loops, for example, motor
speed control and pulp level control to their process  control system.

For mill owners who have built up  an archive of operating data, the use of an expert system may
offer new possibilities.  An expert system is a software tool that can be interfaced with the mill
control software.   Based upon analysis of historical operator responses to changes in the behavior of
the mill, the expert system can propose a  set of responses to a new situation.  The operator can then
choose to accept the system's judgement or try an alternative course of action.  Over time, the system
builds an increasingly reliable empirical model of the process in the form of rules and equations.  In
theory, the  system should allow novice operators to benefit from all of the accumulated wisdom of
their colleagues.  However, effective use of an expert system requires a commitment on the part of
both mill managers and operators to work with the system on a regular basis until it has been
"trained" sufficiently.

Conclusions

Process control is applicable  and probably advantageous to many milling systems requiring continuous
monitoring. The benefits include better information, and thus control of a mill, depending on the
level of instrumentation available.  Examples presented here relate specifically to flotation of
                                                14

-------
                                      Innovative Methods of Managing Environmental Releases at Mine Sites

           lead/zinc/copper ores. Different sensors may be more suitable for monitoring other mill systems.
           Process control equipment is particularly well suited to underground mines where the ore grade
           received by the mill is variable. On-line monitoring of mill feed allows quick, and in some cases
           instantaneous,  response to changing feed grades. In a simple cost/benefit analysis, the facilities
           visited to prepare this report suggest that payoff can occur quickly with increased concentrate quality
           and reduced reagent consumption.


           Environmental benefits can also be realized. While the metal  load to the tailings impoundment was
           reduced in one of the facilities visited, the reduction was marginal compared to the total volume
           generated per unit time.  Greater reductions in wastes  are seen at the smelter, where a higher purity
           concentrate generates less waste in the form of slag.  Also, the reduction in reagent usage is
           significant and has  its own benefits in the form  of costs savings and a reduction  in the total waste
           stream either to the tailings  impoundment or the smelter.   The facilities visited contend  that the
           reagents stay with the concentrate (adhering to the mineral surfaces) and do not generally end up in
           the tailings impoundment.


           Contacts

           The Doe Run Company
                  John Carter
                  Environmental Manager
                  (314) 244-8152

                  Terry Perkins
                  Mills and Metallurgy Manager
                  (314) 244-8612

           ASARCO
                  Aaron  Miller
                  Environmental Engineer
                  (314) 924-2222

                  Brian McKeever
                  Mill Manager
                  (314) 924-2222

           References

Jones, James A., Robert D. Deister II, Charles W. Hill, Derek R. Barker and Patrick B. Crummie,  December
                  1991.  Process Control at Doe Run's Fletcher Concentrator.  Mining Engineering, Vol. 43,
                  Number 12, pages 1407-1411.

Heitman, David A., Undated.   Development and Installation of the Buick  Concentrator Process Control System.
                  Prepared by AMAX Lead Company of Missouri, Boss Missouri.

The Doe Run Company, 1987.  (untitled brochure describing lead production activities).  The Doe Run Company,
                  St. Louis, Missouri.
                                                         15

-------
	Innovative Methods of Managing Environmental Releases at Mine Sites

EPA Response to Comments

The Doe Run Company submitted comments on this report, requesting minor editorial changes. EPA
responded to these comments and revised the report.

The U.S. Bureau of Mines submitted comments, which have been addressed as appropriate.
                                            16

-------
                           Innovative Methods of Managing Environmental Releases at Mine Sites

2.2 PYRITE FLOTATION
At the Superior Mine in Superior, Arizona (Figure 3), Magma Copper Company is currently
producing a high grade pyrite product by subjecting  copper tailings to an additional flotation circuit.
Instead of generating a tailings high in sulfide, the facility produces less reactive tailings and two
products, a fine micronized pyrite (99% iron disulfide) and a coarse pyrite concentrate (45 -47% iron
and 48 - 50 %  sulfur). The pyrite products are packaged and sold for a variety of uses.

The ore body is a vein deposit, and according to  facility personnel, has one of the highest copper
concentrations of any ore mined.  The ore body is unique, with total copper concentrations of 4.32 to
4.48 percent, compared to other copper mines  in Arizona where the total copper concentration
average is 0.58 percent for the same time period1  (Arizona Department of Mines and Mineral
Resources 1990).  Another factor making the ore body unique is its pyrite content.  Most copper
operations are typically mining ore with up to 5 percent pyrite;  on the other hand, the Superior ore
body has as much as 25 percent pyrite. According to facility personnel, the ore has little or no
impurities which  also contributes to its uniqueness.  Specifically, the ore is high in pyrite (FeSj) with
little or no arsenopyrite (FeAsS) and unusually low concentrations of heavy metals other than copper.
This allows a high quality pyrite product to be produced containing little or no undesirable heavy
metals.

Mining was conducted at the facility from 1912 until 1982 when the mill and mine shut down due to
depressed copper prices.  The mine was reopened in 1990. Current underground mining uses the
undercut  and fill method and is conducted at the 3400 - 4200 levels. Present production is 1000 tons
of ore per day which yields 50,000 tons of concentrate per year. From this, approximately  15,000
tons of copper  is  produced annually.  The volume of pyrite produced was not available.  Gold and
silver by-products are also produced from the Superior Mine operations (6300 and 275,000  ounces,
respectively) (Magma Undated).
       1   Reported for  the years  1980-1982,  when Superior  was
operating.  The  average  is  the  weighted average  grade  of ore
milled,  based generally on  an  assay of total  copper.
                                            17

-------
               	Innovative Methods of Managing Environmental Releases at Mine Sites

                   Figure 3. Map of the Superior Mine and Mill
                Source: Geologic Map of Superior Mining Area, Arizona
                         Arizona Bureau of Mines, 1943
GEOLOGIC MAP OF SUPERIOR  MINING AREA  ARIZONA
         ._       .       	  tab I* • 1000 ft
                                   18

-------
 	Innovative Methods of Managing Environmental Releases at Mine Sites

 General Description
 In  1986, while the mine remained shut down, Magma started a unique pyrite flotation circuit using
 existing equipment to remove pyrite from tailings at the site.  In August of 1990, the mine re-opened
 and the operation re-started copper production.  At this time, the feed to the pyrite flotation was
 changed from old tailings to the newly generated tailings as they exit the copper flotation circuit, with
 no other operational changes in the pyrite flotation operation.  In either case, this operation served to
 recover as a saleable product, a material (pyrite) typically discharged as a  component of waste.
 Currently, the operation of pyrite flotation is demand driven, with the pyrite circuit used only as
 needed to meet the demand for the pyrite product.  At other times, the pyrite is discharged with the
 tailings to the tailings impoundment.

 Magma produces pyrite in two sizes.  The coarse pyrite product ( + 200 mesh) is sold in 50, 100, and
 200 pound bags for use in the steel and glass industries.  The fine, micronized pyrite is pulverized to
 50 percent passing 2.34 microns  and sold for use in the manufacture of grinding wheels.   At times,
 pyrite is also sold in bulk form.

 Pyrite, (FeS2) easily oxidizes to form sulfuric acid and, at many mine sites, is associated with acid
 generation from tailings piles and other mining activities.  Removing the pyrite prior to discharging
 the tailings will decrease the potential for acid generation from tailings, which may  in turn, minimize
 possible waste treatment and remediation costs.  These activities can be conducted while  generating
 additional income for the facility. Because this  facility is currently operating the pyrite flotation
 circuit on an as  needed basis to supply demand, pyrite-bearing tailings are discharged periodically to
 the tailings impoundment.  A description of the technical aspects of the pyrite flotation operation is
 provided below.

 Pyrite Flotation and Drying

 The pyrite flotation operation at Superior uses pre-existing equipment.  The system  manipulates  the
 pH of a normal  copper flotation operation in order to float pyrite.  After first adding collectors and
 frothers and raising the pH to depress pyrite and to concentrate copper (typical practice), Magma adds
 sulfuric acid to drop the pH of the copper tailings, making the pyrite float. According to facility
 personnel, the tailings generated after pyrite flotation are primarily hematite.  Using existing
 equipment idle during the mill shutdown, Magma purchased little new equipment other than a
 holoflight furnace for drying the pyrite concentrate.  The same operation was used to float both the
 old tailings and to float tailings currently being generated. Presented below is a detailed  description
 of the flotation operation in the context of current operating procedures.

 Ore is mined underground and then brought to the surface for processing.  The ore  is crushed and
 ground to 70 percent passing 200 mesh and sent for initial copper flotation.  The copper  froth
 flotation circuit is  similar to that used at most other copper flotation facilities, with both rougher and
scavenger circuits. The Superior operation uses Minerec (M200) as the collector and MIBC as the
                                                19

-------
	Innovative Methods of Managing Environmental Releases at Mine Sites

frother.  The equipment used for this initial copper flotation consists of standard froth flotation cells
installed at the facility in the 1970s. The estimated capacity of the Superior copper operation is
42,000 short tons of recoverable copper per year2.  Available data from 1980 and 1981 set copper
recovery efficiencies at approximately 95 % and 93 % respectively (Arizona Department of Mines and
Mineral Resources 1990). Data on current copper recovery efficiencies and the number of flotation
cells in use for copper were not obtained.

The tailings from the scavenger copper flotation circuit are discharged to a cyclone  where sands are
separated from slimes.  When the pyrite flotation is not operating, the copper tailings sands go to the
underground mine area and the tailings slimes are discharged to the tailings impoundment.  When the
pyrite flotation is in  operation, the tailings sands, which are the underflow of the cyclone, go to the
pyrite flotation circuit.

The pyrite flotation circuit is similar to the copper flotation circuit and uses existing flotation
equipment, which was available due to over capacity of the mill compared to the current  rate of
mining.  To produce pyrite concentrate, Magma introduces the copper tailings sands into standard
flotation cells,  adding water, additional flotation reagents (the same reagents used in the copper
flotation circuit) and sulfuric acid (See Figure 4).  The sulfuric acid causes the pH of the copper .
tailings to drop from the pH of 11 or 12 used for copper flotation to a pH of 5.5.  At pH 11, pyrite is
depressed  and does not float,  making concentration of the copper possible; however, as the pH drops
below 9, pyrite begins to float.  At pH 5.5, pyrite is no longer depressed and floats in a manner
similar to  copper. In the pyrite flotation operation, Magma uses seven 100-cubic foot flotation cells
in the rougher  circuit and two 50-cubic foot flotation cells  in the cleaner circuit.  According to facility
personnel, the  rougher circuit discharges tailings for disposal and provides a pyrite concentrate
product with 48 to 50 percent sulfur. The pyrite flotation  tailings are primarily hematite although
specific constituent analysis was not obtained.  Adding the cleaner circuit produces a pyrite
concentrate of  99 percent purity, with underflow or tailings from the cleaner circuit directed back to
the rougher circuit for additional flotation. The pyrite removal efficiency of the flotation circuits was
not obtained.

Once pyrite concentrate exits the flotation circuit, it is pumped to a settling pond for dewatering.
Retention time for concentrate in the pond was not determined.  As the pyrite dries, it is excavated
from the pond and sent to the plant, where it is dried, sized, and bagged for sale.   Equipment at the
plant reflects the only capital expenditure for this project, with the purchase of a "used" holoflight
dryer, "used" bagging equipment, and design and development of pulverizing equipment. The
holoflight dryer, where a large internal screw pulls material through a heated compartment, dries the
       2   Represents  an  estimate of  the productive  capacity  of
primary  recoverable  copper in  concentrates,  precipitates  and
cathodes based  on  historic production  figures and  capacity  of
concentrator.    Does  not represent smelter  or  refinery  capacity.
                                             20

-------
	   Innovative Methods of Managing Environmental Releases at Mine Sites

concentrate to four percent water content.  The coarse pyrite concentrate product, separated from the
fines by screening, is immediately bagged for sale while additional grinding takes place to produce the
fine concentrate product.  The fine concentrate is produced by pulverizing or "micronizing" the finer
panicles to 50 percent passing 2.34 microns, with the  overall size specification range of 1.9 to 3.1
microns.  This material is sorted and bagged, with special care taken to avoid the addition of
moisture.  At this grain size, pyrite is a hazardous material because it is flammable and will ignite
with the addition of moisture.  Specific details on the micronizing operation were withheld due to
confidential business information concerns.

The coarse pyrite products are bagged in 50, 100 or 200 pound bags  and in some cases coarse pyrite
is sold in bulk form where the pyrite is loaded directly onto the customer's truck. Fine pyrite product
is containerized under special conditions (due to flammability) into 30-gallon drums.

The copper flotation circuit operates on a 10 and 4 schedule (10 days on, 4 days off) with
maintenance conducted while the mill is down.  Operation of the pyrite circuit is dependent on
product demand; the specific operating frequency was  not obtained. Drying and bagging the pyrite
concentrate typically occurs 5 days per week with overtime during the wet season due to the increased
drying time necessitated by weather conditions.  Magma sells a total of approximately 500 tons of
pyrite concentrate per month. The majority of the pyrite product is sold through a broker.

Costs

Magma initiated the pyrite flotation project using existing flotation equipment and limited capital
investment in a "used" dryer and bagging system. The only  new equipment purchased was that used
for "micronizing," sorting and packaging the fine concentrate product.  Details on capital and
operational cost,  as well as revenues, were withheld due to confidential business information concerns
on the part of Magma; however, the existing equipment and characteristics of the ore and available
tailings were significant in making  the project financially feasible.

According to facility personnel,  no special permitting requirements or compliance costs are associated
with the project and some savings were potentially realized by cutting down on tailings water
treatment  costs by reducing the amount of tailings and tailings discharge water that is treated under
the facility's existing NPDES permit.
                                               21

-------
                         Innovative Methods of Managing Environmental Releases at Mine Sites


                       Figure 4.  Pyrite Flotation Circuit Flowsheet
                                  Source:  Magma 1992
                                    PvriU Clreifl Ftow«h««t
      Oootno        Overflew to tUna*
      Cycton*
prom Mavongor
float t«li
                                           22

-------
                            Innovative Methods of Managing Environmental Releases at Mine Sites

Benefits
Conceptually, the pyrite flotation operation provides the opportunity for benefits, both financially and
environmentally. Magma sells approximately 500 tons of pyrite concentrate per month. The price of
the concentrate and other information on costs and revenues generated by this operation were withheld
due to confidential business concerns.  However, according to facility personnel, financially "breaking
even" with the pyrite flotation project is a satisfactory result because  of the resultant savings or
avoidance of waste treatment costs associated with acid generation caused by the pyrite in the tailings.
Specific waste treatment costs and the amount of saving generated by avoiding those costs was not
obtained.

With respect to environmental benefits, removing pyrite prior to discharging tailings may serve to
prevent acid generation by removing one of the agents of acid drainage. Because the Superior facility
is currently operating the pyrite flotation circuit on an as needed basis to supply demand, details on
the effectiveness of this operation in preventing acid generation  typically associated with high sulfide
tailings were not available.  Data on the removal efficiency of the pyrite flotation, the amount of
pyrite remaining in the tailings after pyrite flotation, the frequency of operation of the pyrite flotation
circuit, the rate of flow through the pyrite flotation circuit, and  the total amount of tailings generated
compared to the amount of tailings subjected to pyrite flotation  were  not obtained.

Limitations

Limitations to Technology Transfer
According to facility personnel, the Superior pyrite operation has some unique characteristics that
make it especially feasible  to float and produce pyrite as a product.  According to facility personnel,
one of the main factors is the uniqueness of the Superior Mine ore.  At most copper mines, pyrite
concentration in the ore is  on the order of 5 percent, with pyrite in the Superior ore reaching as  high
as 25 percent.  The lower pyrite concentrations in other ore may make pyrite flotation more difficult
and at the least, relatively more expensive.   In addition, according to facility personnel, the Superior
Mine has a unique ore in that there is little or no arsenopyrite and other heavy metal constituents in
the ore, making it simpler  to produce a purer product.  With the above described flotation operation,
the fine pyrite is 99 percent iron disulfide (pyrite, FeSj), with 0.2 to  0.3 percent silica (quartz) and
less than 1 percent of remaining constituents (Magma 1992a). Specific constituent concentrations
were not obtained.

Another potential limitation to wide implementation of the type  of operation practiced at Superior
Mine includes the fact that the operation is demand driven.  The operation removes pyrite only from a
portion of the copper flotation tailings (exact amount not obtained).  According to facility personnel,
some marketing studies show that Magma may have cornered approximately 90 to 95 percent of the
U.S. pyrite market.  Although removing pyrite from tailings by flotation may be a viable option to
prevent or minimize acid generation at certain sites, managing the concentrated pyrite may become an
                                               23

-------
                            Innovative Methods of Managing Environmental Releases at Mine Sites

issue.  Managing large volumes of concentrated pyrite may pose challenges in terms of containment
and final disposition.  Information on other uses or markets for pyrite or its derivatives was not
obtained.

Site-specific Technical Issues

The specific technical problems or limitations of Magma's Superior pyrite operation include the
holoflight dryer.  Because the pyrite is extremely abrasive, the stainless steel screw in the holoflight
dryer receives excessive wear that causes the dryer to require a lot of maintenance.  In addition,
during the wet season, use of the drying operation approaches its design limits. With drying  capacity
identified  as a major concern by facility personnel, the first major change in the system would be to
revise the drying procedures.   Additional technical considerations  include managing the fine  pyrite
concentrate, due to its ignitability when in contact with water or in high dust conditions.  The
availability of equipment, such as excess flotation circuits, at other facilities would also be  a factor in
determining suitability.

Conclusions
In 1986, Magma started a pyrite flotation circuit to recover the pyrite as a saleable product; the
operation  used existing equipment to remove pyrite from existing tailings and from newly generated
tailings.  Prior to this development, pyrite was typically discharged as a component of the waste.
Production of pyrite generated additional income for the facility.

With respect to environmental  benefits, removing pyrite prior to discharging the tailings may reduce
acid generation in tailings.  At the Superior Mine, data on the removal efficiency of the pyrite
flotation,  the amount of pyrite  remaining in the tailings after pyrite flotation, the frequency of
operation  of the pyrite flotation circuit, the rate of flow through the pyrite flotation circuit, and the
total  amount of tailings generated compared to the amount of tailings subjected to pyrite flotation were
not obtained.  Because the operation is demand driven, with the pyrite circuit used only as  needed to
meet the pyrite demand,  tailings containing pyrite continue to be sent to the tailings impoundment.
As a result, details on the effectiveness of this operation in reducing acid generation typically
associated with high sulfide tailings were not  assessed.

According to Magma  personnel, they have secured the majority of the U.S. pyrite market with sales
of approximately 500 tons per  month.  However, at the Superior Mine financially "breaking  even"
with the pyrite flotation project may be a satisfactory result because of the resultant savings or
avoidance of waste treatment costs or remediation associated with acid generation potentially caused
by the pyrite in the tailings.  Although removing pyrite from tailings by flotation may be a viable
option to  prevent or minimize  acid generation at certain sites, managing the concentrated pyrite will
still need  to be addressed.
Contacts
                                                24

-------
                                    Innovative Methods of Managing Environmental Releases at Mine Sites

          Magma Copper Company
                 Eldon Helmer
                 Director of Environmental Affairs
                 (602) 575-5644

          Arizona
                 Roger W. Kennett
                 Environmental Program Supervisor
                 Water Permit Unit
                 Arizona Department of Environmental Quality
                 (602) 207-4607

          Bureau of Mines
                 Janice Jolly
                 Copper Commodities Specialist
                 (202) 501-9414

                 David Forshey
                 Associate Director for Research
                 (202) 501-9291

                 Phillip Meikle
                 Mining Technology, Health & Safety
                 (202) 501-9321

          References

Arizona Bureau of Mines, University of Arizona Bulletin, "Geology and Ore Deposits of the Superior Mining
                 Area, Arizona," Geological Series No. 16, Bulletin No. 151, M.N.  Short, F.W. Galbraith,
                 E.N. Harshman, T.H. Kuhn, and Eldred D. Wilson, October, 1943.

Arizona Department of Mines and Mineral Resources, Richard R. Beard, Mining Engineer, Special Report 16:
                 The Primary Copper Industry of Arizona in 1989,  October 1990.

Magma Copper Company,  San Manuel Division, Material Safety Data  Sheet for Fine Pyrite Concentrate,
                 Micronized Pyrite, August 27, 1992. 1992a

Magma Copper Company,  San Manuel Division, Material Safety Data  Sheet for Coarse Pyrite Concentrate,
                 August 27, 1992.  1992b

Magma Copper Company, Superior Mining Division, Pamphlet, two pages, re: Superior Mining Division, The
                 Mill and Concentrator, and Magma Arizona Railroad Company, Undated.
                                                       25

-------
                          Innovative Methods of Managing Environmental Releases at Mine Sites

EPA Response to Comments
Magma Copper Company submitted written comments on this report to EPA in a letter dated July 6,
1993. Magma requested that minor editorial changes be made to correct factual information
regarding their operations. EPA corrected the draft to incorporate all of Magma's recommended
changes.  The U.S.  Bureau of Mines submitted comments on this report, which have been addressed
appropriately.
                                            26

-------
	Innovative Methods of Managing Environmental Releases at Mine Sites

2.3  METAL CLEANING TECHNOLOGY
Metal parts cleaning is a surface preparation process used to remove organic compounds, such as
grease, waxes, soils, metal fines, fluxes, and oils from the surface of parts made of metal such as
diesel engine or electric motor parts.  The predominant chlorinated solvents used in metal cleaning are
trichloroethylene (TCE), methyl chloroform, perchloroethylene, methylene chloride, and CFC-113
(D'Ruiz, 1991).

Competing alternatives for reducing chlorinated solvents  in metal cleaning operations include control
practices such as solvent conservation and recovery, and  alternative cleaning processes that use non-
chlorinated solutions (D'Ruiz, 1991).  Conservation and  recovery has evolved into a logical short-
term response to a chlorinated solvent supply that is rapidly diminishing due to increased regulation.
Since alternative cleaning solutions are subject to less regulation and appear to exhibit less harmful
environmental and human health effects than chlorinated  solvents,  their use will most likely continue
to increase. In fact, many industries that rely on metal parts cleaning are switching from chlorinated
solvents to alternative cleaners.

In addition, many metal parts cleaner manufacturers produce non-chlorinated cleaning solutions for
use in their cleaning equipment. These companies are promoting their cleaners as  environmentally
compatible alternatives to chlorinated solvents currently used in the metal cleaning industry.  Non-
chlorinated cleaners can be grouped in two general categories:   semi-aqueous and aqueous cleaners.

Semi-Aqueous Cleaners

This section briefly describes the two categories of semi-aqueous cleaners:  terpenes and
hydrocarbons.

Terpene Cleaning Solutions

Terpenes are chemical compounds extracted from plants such as the bark of trees or citrus fruit skins.
While possessing excellent solvency characteristics, there are factors, such as safety that must be
considered.  In general, terpenes cannot be sprayed  in an open tank because the vapor has a relatively
low flashpoint.  This generally limits open tank liquid heating to 100 F degrees or less (CFC
Alternatives, July 1991).  In addition, terpenes are not as easily recycled as aqueous cleaners. (Waste
Reduction Resource Center, August 1992)

Hydrocarbon Cleaning Solutions

Hydrocarbons, usually combined with a surfactant and rust inhibitor, are effective  in removing soils,
coolants, greases, and waxes.  These compounds can be effectively recycled.  But, like terpenes, all
hydrocarbon cleaners have low flash points that must be considered and planned for in equipment
selection.  (Waste Reduction Resource Center, August  1992)
                                               27

-------
                            Innovative Methods of Managing Environmental Releases at Mine Sites

Aqueous Cleaners
Aqueous cleaning is a process that combines the cleaning action of a water-based cleaning solution
with some type of mechanical cleaning action.  Aqueous cleaning technology is widely available and
used by many types of industries to clean metal parts.  Aqueous cleaning is currently viewed as a
viable alternative to solvent-based cleaning because the majority of aqueous cleaning solutions are not
formulated with solvents and do not result in solvent emissions.  (D'Ruiz, 1991)

Chemical detergents used in aqueous cleaning are available in many different formulations and may
also be custom formulated for particular applications. Formulations may be powders or liquids that
are added to water in concentrations that depend on the formulation and the cleaning application.
These detergents are available from aqueous cleaning equipment manufacturers as well as from
companies that specialize in formulating cleaning solutions.  The size of equipment and type of
cleaning (automatic or  manual) depend on the operation and the degree of cleanliness needed.
Aqueous cleaners can be grouped into three categories:  acidic, emulsion, and  alkaline.

Acidic Cleaning Solutions
Acidic cleaners are commonly used to remove rust and scale, but can also be used to remove oxides,
flux residues, corrosion products, and tarnish films.  Acidic cleaners can also be used to clean
aluminum, a metal susceptible to etching when cleaned with strong alkaline detergents (D'Ruiz,
1991). However, acidic cleaners are not widely used by industry.

Emulsion Cleaning Solutions
Aqueous cleaners that contain emulsifiable solvents are classified as emulsion cleaners.  These
cleaners consist of a solvent suspended in a water-based cleaning solution.  Emulsion cleaners
combine the cleaning abilities of solvent and  aqueous cleaners, and tend to be  used in applications
involving organic contaminants. The solvents used in emulsion cleaners are usually organics such as
alcohol, methylene chloride, or methyl chloroform. (D'Ruiz, 1991) Emulsion cleaners are not widely
used.

Alkaline Cleaning Solutions
Alkaline cleaners are formulated and used with appropriate cleaning equipment to remove the same
organic or inorganic contaminants as chlorinated solvents.  Contaminants encountered in maintenance
cleaning operations, including din and carbonized oil and grease, can be removed by alkaline
cleaners. (D'Ruiz, 1991) However, most cleaning situations require the addition of other compounds
to increase the solution's cleaning  efficiency.  These additives perform functions such as:

        • Penetrate soils to wet surface
        • Emulsify solids  into solution (can be filtered out or rinsed off)
        • Neutralize
                                               28

-------
	      Innovative Methods of Managing Environmental Releases at Mine Sites

        • Saponify (change insoluble fats and fatty acids into water soluble soaps)
        • Oxidize  (loosen rust and stains for easy  removal)
        • Precipitate (convert soils to heavier form for removal as sludge)

        • Coagulate (to assist in removal of suspended soils by filtration)

        • Float (cause soils to migrate to surface for skimming) (W.R. Grace and Company).3

Metal Cleaning Equipment

Switching to aqueous or semi-aqueous cleaners and processes generally requires modified or
additional equipment, multiple cleaning and rinsing steps, and drying equipment depending on the
cleaning level needed (Waste  Reduction Resource Center, August 1992).  Metal pans cleaning
equipment manufacturers produce various sizes of cleaning equipment along with the necessary
cleaning solutions.  The company purchasing the services of the cleaning equipment manufacturer can
select whatever size of equipment and cleaning solution that would best handle the needs of their
operation.  In fact,  many metal cleaning equipment manufacturers customize their equipment for
specific facility needs.  Some of this  equipment has been used at mine sites.  The Newmont Rain
facility staff indicated to EPA their satisfaction with their equipment.

In reference to cleaning applications attainable with aqueous cleaning, various types of equipment are
available for  use. (This report only elaborates on cleaning applications used with aqueous solutions
because they are the most widely used cleaning solutions.) The main differences between the types of
aqueous cleaning equipment is the way in which they generate the mechanical energy to clean the
parts, and their size.  This class of cleaning equipment is divided broadly into two categories:
immersion and spray cleaners.

Immersion Cleaners

Aqueous immersion cleaning usually  depends on aqueous detergents used in a mechanical cleaning
process (D'Ruiz, 1991).  Immersion cleaning equipment consist of one or more tanks, with still or
agitated solutions.  Immersion cleaning equipment  varies widely in size and can have wash tank
capacities anywhere from several gallons to hundreds of gallons; however, immersion cleaning
equipment is generally too small to use at a mine site.
   3 However, problems can result from the use of alkaline cleaners with additives. Special handling, health, safety,
treatment, and disposal must be considered in a process design and cleaner selection. Some additives,  such as certain glycol
ethers and esters have unanswered health and safety questions.  When selecting any cleaning solution, a facility should
review its material safety data sheet (MSDS), biological oxygen demand (BOD), and chemical oxygen demand (COD).
(Waste Reduction Resource Center, August 1992)
                                               29

-------
	   Innovative Methods of Managing Environmental Releases at Mine Sites

Spray Cleaners

Immersion cleaning equipment tends to deliver less mechanical energy to contaminated parts than
spray cleaners.  This is because spray machines run at higher pressures and allow faster travel of
contaminated parts through the machinery.  Three general types of spray machines exist: rotary,
conveyor, and batch.

Rotary Spray Equipment
Rotary spray equipment employs a drum with a partition that spirals along the inner surface of the
drum.  As the drum rotates, the metal parts are transported along the length of the drum.  Rotary
spray machines  are designed to clean small equipment parts, such as screw machine pans.  Rotary
equipment can clean a large volume of parts, but the parts must be able to tolerate the rumbling action
of the rotating drum. (CFC Alternatives, February 1991)

Conveyor Spray Equipment
Conveyor spray equipment is generally used in manufacturing applications in which the parts only
need a quick cleaning cycle and the parts have flat, controlled surfaces (CFC Alternatives, February
1991). Conveyor spray equipment is not well suited for mine operations.

Batch Spray Equipment
Batch spray  machines are typically used in maintenance applications.  This is because cleaning
equipment for maintenance purposes usually requires lower cleanliness standards than other cleaning
applications, such as manufacturing.  Batch spray cleaning may be done in a single spray chamber
(CFC Alternatives, February 1991). Batch  spray cleaning is excellent for heavy greases and tars.  In
addition, batch  spray machines are readily designed to accommodate objects as large as train electric
motors and engines (D'Ruiz, 1991; CFC Alternatives, February 1991).  Batch spray equipment is
essentially the only type of spray unit suited for large maintenance applications, such as those found  at
mine .sites.
                                               30

-------
	Innovative Methods of Managing Environmental Releases at Mine Sites

References

CFC Alternatives, Aqueous Cleaning, Environmental Program Office, Irvine, CA, 7 pp., February
       1991.

CFC Alternatives, Semi-Aqueous Cleaning, Environmental Program Office, Irvine, CA, 5 pp., July
       1991.

Cleaning Handbook, W.R. Grace and Company, 9 pp., No date.

D'Ruiz, Carl, Aqueous Cleaning as an Alternative to CFC and Chlorinated Solvent-Based Cleaning,
       Noyes Publications, Park Ridge, NJ, 119 pp., 1991.

U.S. Environmental Protection Agency,  Mine Site Visit Report, Newmont Rain Facility, 1992.

Solvents:  The Alternatives, Waste Reduction Resource Center for the Southeast, 10 pp., August
       1992.
                                            31

-------
                            Innovative Methods of Managing Environmental Releases at Mine Sites

3.0  RECYCLING

3.1  SLAG REPROCESSING
Magma Copper Company operates the San Manuel mine, mill, and smelter facilities located in Final
County, north of Tucson, Arizona.  Operations began at San Manuel in the  1950's.  The facility
encompasses  approximately  12,000 acres of patented land with operations that extract, beneficiate,
and process both sulfide and oxide ores  to recover copper and molybdenum (See  Figure 5). Oxide
ore operations consist of an open pit mine and an in situ leach operation, a lined  leach pile containing
ore mined from the open pit, and a solvent extraction/electrowinning facility.  The sulfide  ore
operations consist of an underground mine, a mill facility for copper and molybdenum flotation, and a
smelter and electrolytic refinery.

The facility is located in the semi-arid southwest desert; annual rainfall is 13 inches  with an
evaporation rate of  117 inches per  year.  A mining town, also named San Manuel, was built near the
mill and houses up to 5000 residents.  Deep wells supply drinking and process water for the town and
facility.

In general, the copper smelting process  has several features. Heat is applied to melt ore, flux, and
other copper  bearing materials, principally in a primary smelting furnace.  The furnace produces
copper matte, slag containing waste products, and impurities. The molten copper matte, containing
copper, iron, sulfur, and minor impurities, is processed in a separate converting  furnace where
metalic copper is separated and a converter slag produced.  The metalic copper may be further
purified in a  refining furnace with  return of molten impurities to prior process steps.

The separation of copper from sulfur is  one of the more important aspects of the smelting  process.
Sulfur in ore, and consequently in  slag,  is important because it provides a fuel value as well as acting
as a reducing agent during smelting. In a flash furnace, the type of smelter used at  San Manuel, dry
concentrates are fed to the furnace. Sulfide reacts with forced oxygen (an exothermic reaction)
causing oxidation of the concentrate material and melting of the reacting particles.  A matte is formed
containing primarily copper, iron,  and sulfur with lesser amounts of impurities such as arsenic,
bismuth, nickel, lead, antimony, zinc, gold, and silver. From the flash furnace,  the matte goes to the
converters where it is oxidized and impurities, primarily iron and sulfur,  are removed. Slag is
generated in both the flash furnace and the converters; typically, copper concentrations in converter
slag are much higher than in flash  furnace slag (Weiss, 198S; Wiley and Sons, 1980).

At San Manuel,  the slag reprocessing operation was designed to extract copper values from slag using
an existing flotation operation.  Prior to flotation, slag is cooled, crushed, and milled. The flotation
operation uses one of the eight existing  ore flotation circuits in the mill to produce a copper
concentrate which is then re-smelted.
                                               32

-------
           Innovative Methods of Managing Environmental Releases at Mine Sites
                                     SAN  KANUZL

                                     KAQtA COPPER COMPANY
                  Figure 5.  Location Map
Source: Arizona Department of Mines and Mineral Resources, 1990.
                           33

-------
	    Innovative Methods of Managing Environmental Releases at Mine Sites

Slag from the converter at San Manuel contains from 5 to 7 percent copper. Slag generated from the
flash smelter furnace contains approximately 2 percent copper  (1.8% to 2,36% are mentioned in
various references) (Weiss, 1985; Magma, 1992c; Magma, 1988).  Both slags generally contain a
higher copper concentration than the original ores, with ore currently mined from the underground
San Manuel mine containing approximately 0.7 percent copper.  Because of the comparatively high
copper content of the slag (both furnace and converter slag), Magma is reprocessing this waste for
material recovery.

Slag Reprocessing
The opportunity for slag reprocessing at Magma's San Manuel facility came about because of excess
capacity caused by a decrease in the production of ore, the availability of stockpiled slag, and the
decrease in the quantity of copper within the ore.  The number of flotation circuits to allocate to slag
was determined by the  excess capacity of the flotation operation.

Initially, the facility was disposing of slag on the ground without any containment.  Currently, to
recover copper, Magma grinds the slag,  removes the copper through the flotation process, and
disposes of the remaining  finely ground material in the tailings impoundment.  Although the copper
has been removed, information on remaining constituent concentrations  and their mobility in the
tailings was not assessed.

Prior to the implementation of their slag reprocessing operation, slag generated from Magma's
original reverberatory furnaces was considered a waste and disposed of  in piles at an unspecified
onsite location.  No information was provided indicating the volume of accumulated slag prior to
1974.

In 1974, Magma began reprocessing piles of reverberatory slag.  Between  1974  and 1988, the
existing stockpiled reverberatory slag was reprocessed through the grinding, flotation, and smelting
stages. An Outokumpu flash furnace replaced the reverberatory furnaces in 1988.  This technological
upgrade uses less fuel,  produces a richer grade of copper mane, emits less offgas, and is beneficial
for the sulfuric acid plant.  All slag generated from  the flash furnace is  currently reprocessed.

At San Manuel,  the Outokumpu  flash furnace and the converter furnace together generate slag at a
rate of approximately 1900 short tons per day (stpd), or 693,000 short tons per  year. The flash
furnace generates a larger percentage of the total at  approximately 1500 stpd, while the converter
furnace generates the remaining 400 stpd.  (See Table 2) Prior to 1988, the reverberatory furnaces
yielded 1500 stpd of slag.
                                               34

-------
                            Innovative Methods of Managing Environmental Releases at Mine Sites

                       Table 2.  Copper Values from Slag at San Manuel
                                     Source: Magma, 1992c
Type of Slag
Flash Furnace Slag
Convener Slag
Combined Slags
Slag Concentrate
Slag Tailings
stpd
1526
396
1922
163
1759
% Copper
1.80
7.00
2.87
30.0
0.35
stpd Copper
27.5
27.7
55.2
49.0
6.2
Based on information obtained from Magma's response to EPA's National Survey of Solid Waste from
Mineral Processing Facilities, slag from the flash furnace contains  the following constituents: copper
(2.39%); iron (46.95%); total sulfur (0.77%); aluminum (1.70%); and silicon (14.71%).  The survey
did not include a list of concentrations of constituents in converter furnace slag, however, main
constituents are similar with the copper content being higher (5 to  7%).  Additional data on slag
constituent concentration was not available (Magma, 1988).

Slag Cooling
Copper recovery from slag is dependent on the treatment of the material  prior to beneficiation at the
mill.  Slow cooling in the initial stages is imperative to allow copper particles to coalesce and
crystallize.  According to facility personnel, the first eight hours of cooling are the most critical for
optimum copper recovery.

Molten slag from the flash smelter and converter furnaces is transferred to slag cooling pits to allow
slag to harden and for copper minerals to crystallize.  Slag from the flash furnace is transported in a
40 ton ladle carrier (Kress slag pot  carrier) to one of 168 flash furnace cooling pits, each
approximately 26.5 feet long and 14.5 feet wide. Each pit holds one ladle; slag from one ladle
typically forms a layer 20 to 24 inches thick.

Slag from the converter furnaces is  placed in one of 72 converter slag cooling pits which are smaller
than the flash furnace pits: the converter  slag pits have a capacity of only 26.6 tons and are each 26.5
feet long and 11 feet wide.

Both the converter and the flash furnace slag pits are arranged in large blocks. Each block  is
separated by areas large enough to allow vehicle access.  The cooling pits are constructed of crushed
slag that creates berms around each pit.  The pits are rilled on a continuous cycle to optimize their
usage so at any one time there is likely to be pouring of molten slag, air cooling, water cooling,
dozer ripping and preparing of pits  for the next cycle occurring.
                                               35

-------
                            Innovative Methods of Managing Environmental Releases at Mine Sites

After slag has been placed in the cooling pits, the slag is left to air cool for 8 hours. This is followed
by variable periods of water cooling and additional air cooling for a total of 2-3 days.  A water spray
system is used for the water cooling sequence.  A main  water line (6" to 8" diameter) delivers water
to 18 spray nozzles that run down the center of each block of cooling pits.  Water spray to individual
blocks can be controlled so that spray is kept off unused pits.  A process flow diagram provided by
Magma (Figure 6) lists the normal flow rate of water used in slag cooling as  1100 gallons per minute
(gpm), with a design  flow of 1500 gpm. The timing of water application is dependant on smelter
demands;  originally, 96 hours of cooling was planned, but due to the increased rate of slag
generation, Magma decreased the total period of cooling.

When the slag has hardened, a dozer-ripper is used to break up the solidified slag.  A front-end
loader then picks up crushed slag and transfers  it via trucks to a 50-ton hopper.  The hopper is
equipped with a 24-inch grizzly, with a crushing plant underneath.  Slag is reduced in  size to minus
8-inch pieces by a 32 x 42-inch jaw crusher.  The jaw crusher is dedicated to the slag processing
system, although it is the same type as that used for ore.  Crushed slag is discharged from the jaw
crusher to a 36-inch belt conveyor that passes to a 48-inch belt conveyor before discharging to the
crushed slag  stockpile, which has a 2000 ton capacity.   Front end loaders remove crushed slag from
the stockpile for transport to the concentrator crushing and grinding circuit (Magma, 1992c).   .

Until 1991,  Magma operated a vibrating screen (5 x 16-foot single deck) for  separation of fines less
than 1/2-inch size.  This separating equipment was a high maintenance item,  with frequent
breakdowns requiring frequent repairs;  therefore it was  removed from  the crushing system.  Although
the fines were initially reused as building material for berms between individual cooling pits, they are
no longer segregated  and all material, including material less than 1/2-inch is subjected to flotation.

Flotation
San Manuel operates  two separate,  two-stage froth flotation systems, one for ore and another for slag.
Of the eight flotation circuits at  San Manuel, one is dedicated to slag flotation. The ore and slag
flotation circuits are exactly the  same except that a different primary collector, Dithiophosphate
55741, is used in slag flotation.   Methylisobutyl carbonol (MIBC) is used as a frother in both
flotation circuits.  Collectors in the ore circuit include sodium xanthate, fuel  oil (jet fuel A, which is
used as a molybdenum  collector), and VS M8,  a proprietary flotation agent containing carbon
disulfide. The underflow from both the slag and ore flotation circuits  is sent to the tailings thickener
and onto the tailings  impoundment.

The eight flotation circuits include  a total of ten 2,000 cubic foot rougher cells, and 143 rougher cells
of smaller dimensions (300 cubic feet). Cleaner flotation takes place in sixteen 39-foot high column
flotation cells that concentrate the slag/ore to 30 percent copper.  The  overflow from rougher flotation
is transferred to a cleaner/column flotation stage in each circuit, while underflow goes to Magma's
tailings thickeners (Figure 7). In each  circuit,  the second stage of flotation occurs  in the  39-foot high,
                                                36

-------
   Innovative Methods of Managing Environmental Releases at Mine Sites
Figure 6.  Process Flow Diagram for Slag Cooling
            Source: Magma, 1992.
                     37

-------
           Innovative Methods of Managing Environmental Releases at Mine Sites
w
«nar   V~^
JM> Gwnv  \  /
«••*»       i
           | •• Be*
                                                                   F-MO
                                                               r i a-
                                                               wr i r **•
                    Or*
•M
4000 T
Rv
Or*
MOOT

1
^^^1
!
f
/
8ymn«
rc«M
>«* 1
\
1

1
/
1 1

                                                                         \

                                                                         Symom
                                                                         ream
         Figure 7.  Flotation Operation Flow Diagram
                    Source: Magma, 1992.
                             38

-------
 	Innovative Methods of Managing Environmental Releases at Mine Sites

 40 cubic feet cleaner/column cells. In seven of the eight circuits (ore circuits), the overflow from the
 ore cleaner cells goes to separate collection launders for transport to the molybdenite plant.  (The
 underflow goes to the ball mills and is returned to the rougher for additional flotation.)  Slag
 concentrate, produced in one of the eight flotation circuits, goes directly to dryers and is not sent
 through the molybdenite plant.  Slag concentrate  has  a copper concentration of approximately 30
 percent; identification and concentrations of other constituents was not obtained.

 Slag concentrate fed to the furnace composes approximately 7 percent of the total furnace feed.  The
 exact amount of slag concentrate feed ranges from 3 to 10 percent and is adjusted as necessary for the
 proper feed composition.  Variables affecting the furnace feed rate include the amount of sulfur,  iron,
 and silica in the slag concentrate.  Details on how furnace feed is controlled were not discussed.

 According to facility personnel, the slag reprocessing system now operates at a slag feed rate of  110-
 120 tons/hour, but Magma will soon process 130 tons of slag per hour.  Because of the  increase  in
 slag generation,  Magma plans to expand the number of slag cooling pits.

 Slag reprocessing generates slag tailings which are combined with the ore tailings.  According to
 Magma, primary constituents in slag tailings are silica, iron, magnesium, sodium, and smaller
 amounts of copper, lead, and zinc, as well as other trace elements.   Specific data on the constituents
 were not discussed.

 The amount of slag tailings as a percentage of total tailings disposal at San Manuel is approximately 3
 to 6 percent. According to Magma, 65,000 short tons of slag tailings were generated and  disposed in
 1990, and 69,200 short tons in 1991.  The total quantity of tailings generated (slag and ore combined)
 in 1990 was 17,000,000 short tons and  17,689,000 short tons in  1991.

 Tailings from the mill are typically 30 percent solids  and after the thickeners, are sent to the tailings
 impoundments as 50 percent solids slurry.   Slag tailings are co-disposed with ore tailings into tailings
 impoundments, located approximately 1/2 mile west of the San Pedro River.  According to Magma,
 San Manuel's water reclaim system reclaims most tailings water, leaving only 12.5 percent moisture
 content in the tailings.  The tailings liquid has a pH of 8.4.

 Because all slag is reprocessed, there is  no permanent disposal of slag at the Magma site.  Slag pits
 are used to allow cooling of the slag prior to crushing, flotation,  and re-smelting.  According to
facility personnel most of the cooling water evaporates. Any remaining water runs off the cooling
pits through unlined  washes or shallow culverts to the tailings ponds. During the site visit white
evaporite residue was observed in and along the drainage.
                                               39

-------
	          Innovative Methods of Managing Environmental Releases at Mine Sites

Costs
According to facility personnel, since the slag reprocessing operations involve the use of existing
equipment, no purchase of new equipment/materials, installation/site preparation, or engineering and
procurement costs were necessary for application of the process to begin.  No specific cost
information on the construction of the cooling pits or equipment was obtained.

Detailed breakdown of costs were not provided by Magma, but facility personnel indicated a general
cost of $5/ton of slag processed through  the mill circuit. No information was provided on energy or
labor costs.  Water costs were reported by Magma to be minimal; the facility reuses water from its
tailings  ponds for use in cooling water, dust suppression, plant make-up water, etc.

Magma stated that there were no  cost savings  that it was aware of, such as reduced disposal fees,
decrease in raw materials, etc.  During the site visit, however, facility representatives pointed out that
the reprocessing of slag reduced the volume of ore that needs to be mined, thus resulting in an
unspecified savings in mining costs. By reducing the volume of ore required for full mill operation,
the facility is also extending the life of mine based on the existing volume of minable ore.  According
to facility personnel, approximately one ton of slag displaces two tons of ore; however, resolution of
this ratio is unclear as slag has a  copper  concentration  of 2.8% while the ore has approximately 0.7%
copper.

Benefits
The key benefit derived from San Manuel's slag reprocessing operation has been the economic
recovery of additional copper. Not only has the slag reprocessing operation provided a source of
copper, but it has been provided by what is normally a waste material.  It is important to note
however,  that while the facility has eliminated one waste stream (slag), there is an increase in tailings
disposal.

Currently, to recover copper, Magma grinds the slag,  removes the copper and disposes of the
remaining finely ground material in the tailings impoundment.  Although the copper has been
removed,  no  data were  available  on the remaining constituents in the tailings and their mobility.

According to the Magma representatives, since all revenues (from processing of slag into concentrate)
are accounted for as internal toll  costs between the  smelting and milling units, it is impossible at this
time to  determine a set  value on revenues generated or saved due to the reprocessing of slag.

Limitations
The success of copper recovery from slag reprocessing operations at San Manuel is due in large part
to the availability of an existing,  fully integrated facility with both a mill and a smelter. At other
locations, without such  a set-up,  the operation would be much more difficult to establish and
                                               40

-------
                            Innovative Methods of Managing Environmental Releases at Mine Sites

potentially cost prohibitive.  A substantial capital investment would be required if the equipment were
not already on-site; Magma's capital costs related to reprocessing were low.

Obviously, the percent copper in slag, or other waste  material,  is a significant factor in determining
its suitability for reprocessing.  As for the minimum content of copper that could feasibly be
recovered, Magma indicated that there were too many variables, including distance from slag source
to mill and smelter, rate of cooling, type of furnace, and economic factors such as the selling price of
copper, etc. to identify a specific concentration.

The rate of slag cooling and subsequent crystal growth was identified as a major technical factor
determining the success of slag reprocessing.  Because the cooling rate of the slag is crucial to the
successful recovery of copper, not all slag is suitable  for slag reprocessing.  This is especially so
when considering reprocessing of existing stockpiles of slag as  opposed to reprocessing of currently
generated  slag.

Other limitations that may be encountered include rising  energy and maintenance costs.  Other sites
may have  additional technical limitations, for example, reprocessing with reverberatory slag is not as
favorable as with flash furnace slag: reverberatory slag is harder to grind and to crush.

Conclusions
The opportunity for slag reprocessing at Magma's San Manuel  facility came about because of excess
capacity caused by a decrease  in the production of ore, the availability of stockpiled slag, and the
decrease in the quantity of copper within the ore.  The number of flotation circuits to allocate to slag
was determined by the excess capacity in the process.  Based on available information presented by
Magma, with the general cost  of $5/ton of slag quoted by Magma and a derived copper value (from
the slag) of approximately $0.082/pound, slag reprocessing appears to be a profitable operation.

According to the 7990 Repon to Congress on Special Waste from Mineral Processing, two other
facilities, in addition to San Manuel, utilize the concentrator to recover copper values from smelter
slag:  Copper Range in Michigan and the Kennecott Mine in Utah. Unlike the Utah facility that
operates a separate slag flotation operation,  San Manuel and Copper Range each use similar
operations for slag and ore which result in co-generation of slag tailings (another special waste) and
ore tailings from the operation.

Contacts

Magma Copper Company
        Eldon Helmer
        Director of Environmental Affairs
        (602) 575-5644
                                               41

-------
	Innovative Methods of Managing Environmental Releases at Mine Sites

Arizona
       Roger W. Kennett
       Environmental Program Supervisor
       Water Permit Unit
       Arizona Department of Environmental Quality
       (602) 207 - 4607

Bureau of Mines
       Janice Jolly
       Copper Commodities Specialist
       (202) 501-9414

       David Forshey
       Associate Director for Metallurgy Research
       (202) 501-9291

       Phillipe Meikle
       Mining Technology, Health & Safety
       (202) 501-9321

References

Arizona Department  of Mines and Mineral Resources. 1990.  The Primary Copper Industry of
       Arizona in 1989, Special Report No. 16, by Richard R. Beard, October,  1990.

EPA, 1990.  Report  to Congress on Special Wastes from Mineral Processing; Summary  and Findings,
       Methods and Analyses, Appendices. EPA/530-SW-90-070C, July 1990.

Magma, 1992.  Correspondence from Alfred Celaya,  Senior Environmental Engineer, Magma Copper
       Company to  Robert Tonetti, Special Waste Branch, U.S. Environmental Protection Agency,
       October 21,  1992.

Magma, 1992b. Description of Mining and SX/EW Operations. Undated.

Magma, 1992c. Slag Reprocessing Operations: Acid Plant Operations. Undated.

Magma, 1988.  National Survey of Solid Wastes from Mineral Processing Facilities,  EPA
       questionnaire, as responded to by Magma Copper Company, San Manuel Division. June
       1989.

Magma, 1988a. Pamphlets re: Operations at San Manuel, including "The Underground  Mine"; "The
       Smelter"; "Concentrating at San Manuel"; "The Open Pit Oxide Mine"; "In situ  Leaching";
       "Solvent Extraction/Electrowinning"; "Electrolytic Refining"; and "Continuous Cast Copper
       Rod".  1988.

Weiss, 1985.  Society of Mining Engineers, Mineral Processing Handbook, Volumes 1  and 2; by
       SME of the American Institute of Mining, Metallurgical, and Petroleum Engineers, Inc.,
       Norman L. Weiss, Editor-in-Chief; 1985.

         Volume I, Section 5: Flotation, N. Arbiter, Section Ed., H. Cooper, M.C. Fuerstenau,
         C.C. Harris,  M.C. Kuhn, J. D. Miller, and R.F.  Yap, Associate Eds., pp. 5-1 to 5-110.
                                            42

-------
                          Innovative Methods of Managing Environmental Releases at Mine Sites

         Volume II, Section 14H: Copper - Processing of Concentrates and Development Trends,
         D.C.Moore, pp. 14H-3 to  14H-14.

Wiley and Sons, Encyclopedia of Chemical Technology, Third Edition, Volume 9, Extractive
       Metallurgy, pp. 749-750, Kirk-Othemer, 1980.
                                            43

-------
                          Innovative Methods of Managing Environmental Releases at Mine Sites

EPA Response to Comments

Magma Copper Company submitted written comments on this report to EPA in a letter dated July 6,
1993. Magma requested that minor editorial changes be made to correct factual information
regarding their operations.  EPA corrected the draft to incorporate all of Magma's recommended
changes.

The U.S. Bureau of Mines submitted comments on the report. These have been responded to as
appropriate.
                                             44

-------
 	Innovative Methods of Managing Environmental Releases at Mine Sites

 3.2 TAILINGS REPROCESSING OPERATION

 Magma Copper Company's Pinto Valley Division (Pinto Valley) consists of two operations.  The
 Miami Unit, located adjacent to the town of Miami, in Gila County, Arizona, is a tailings
 reprocessing operation, the focus of this section of the report, and an in situ leaching operation.
 Pinto Valley's second operation, the Pinto  Valley Unit, consists of an open pit mine and associated
 facilities located five miles west of Miami.  The reprocessing operation started in 1989 and is
 proposed to continue through 1997. The reprocessing operation, including the in situ leaching
 operation, employs 70 people.   The site is located approximately 60 miles east of Phoenix,  Arizona
 (Figure 8). The area is characteristic of the semi-arid southwest region. The tailings reprocessing
 operation involves reprocessing the Miami  #2 tailings pile, which covers 210 acres  and contains 38
 million tons of tailings.  The pile was deposited between 1911 and 1932 (McWaters, 1991).

 Pinto Valley hydraulically mines the tailings pile, leaches the tailings and produces  copper by using a
 solvent extraction/electrowinning facility.   After leaching and washing  of the slurried tailings, the
 remaining slurry is piped overland approximately five miles to the Copper Cities Deep Pit for final
 disposal.

 Miami #2 Tailings Pile

 The Miami #2 tailings pile was deposited during the operation of a Miami Copper Company mine and
 mill. The operation used a gravity mill and later flotation to separate copper from the ore.  The
 tailings were deposited in six canyons adjacent to the mill using  launders and spigot valves.
 Eventually, five canyons filled and  one tailings pile was formed; it is now referred to as the  #2
 tailings pile.

 The efficiency of the gravity separation method at the time  is reflected  in the copper content of the
 tailings through the depth of the pile.  The  oldest tailings contain 0.72  percent copper while  those
 deposited most recently contain 0.11 percent copper; the average copper content is 0.33 percent.
 Typically, the oldest deposits are at the lowest portions of the #2 tailings pile. Approximately 55
 percent of the copper is in an oxide form with the remainder being in the form of sulfides.

 Because the top lifts of tailing deposition have very low copper contents (due to increased efficiency
 of copper concentration),  Magma pre-strips the top layer in order to get to an economically
 recoverable zone.  In general, the copper content increases  with depth (and age) in the tailings pile.
 Magma still reprocesses this pre-stripped layer, although the copper recovered is extremely low.

Hydraulic Mining

The hydraulic mining system simplifies the remining operation in three ways.  First, the hydraulic
system eliminates the need for excavating and  hauling equipment normally associated with
conventional mining.  Second, the energy produced by the water jets serves to break down clay
aggregates allowing more efficient separation,  and finally, the hydraulic action and acidic solution
                                               45

-------
           Innovative Methods of Managing Environmental Releases at Mine Sites

                                     LOCATION MAP
        Figure 8.  Pinto Valley Miami Unit, Location Map
Source: (Modified from The Primary Copper Industry of Arizona, 1990.)
                            46

-------
                            Innovative Methods of Managing Environmental Releases at Mine Sites

provide the appropriate slurry necessary for the subsequent hydrometallurgical  beneficiation.

Two sets of two, four-inch monitors (water canons) apply solution (raffinate), with a pH of 1.8, to
the upstream face of the tailings pile at a pressure of 300 to 350 psi at a rate of 2,400 gpm.
Originally, the system was designed to operate at a pressure of 435 psi, but Magma has reduced the
operating pressure.

The monitors wash tailings down the face of the pile into a sump.  Eductors, a type of vacuum pump
that can pump air and water, generate a slurry that contains approximately 32 percent solids by
weight. The two eductors pump the slurry at a rate of approximately 500 tons per hour (MeWaters,
1991).

The monitors, sumps and eductors advance as the face of the tailings pile recedes.  The equipment is
advanced frequently so that the slurry paths are kept short, which in turn, prevents the solution from
migrating through the pile and into the groundwater (Hartman, 1992).  The eductors move the slurry
from the sumps to a grizzly.  The  grizzly is equipped with a screen that  rejects material such as
scraps of wood and other debris in the tailings,  larger than 1/2 inch.  The undersized material passes
through the grizzly into a tank where it is pumped to the processing plant.

Magma conducts  periodic blasting  of the tailings face to prevent large, unstable blocks from
sloughing.  The blasting is done for safety reasons and to protect the monitor stations from being
buried.

Leaching
The low pH of the solution used in the monitors actually begins the leaching as the slurry is washed
off the face of the tailings pile.  The first step within the plant is the leach tank (dimension of 20' x
30'), where the pH of the slurry is lowered to 1.5 using sulfuric acid.  The initial plan of the
operation called for 14.5 Ib of sulfuric acid and 0.04 Ib of flocculent per ton of tailing.  The
maximum capacity was proposed to be 12,000 tons per day.  Figure 9 shows the leach tank and
thickeners in a process flow diagram. From the leach tank, the slurry goes to the first of two
thickeners.   The overflow from this thickener becomes the pregnant leachate solution (PLS), which
goes into a vessel where it is flocculated and clarified at a rate of 3,000 gpm. This solution is then
sent to a pregnant leach solution pond and on to the solvent extraction circuit.  The underflow from
the first thickener is pumped to a second vessel, washed with raffinate, and pumped to the second
thickener.   The overflow from the  second thickener  is ultimately returned to the mining circuit as feed
for the monitors.  The underflow is pumped into a vessel, washed with raffinate, and then pumped
into the tailings disposal area (McWaters,  1991). The first and second thickeners are 375 feet and
180 feet in  diameter, respectively.
Through a single  control room, a computer is used to monitor and control most of the operations
throughout  the facility.  A printout of the computer screen showing instantaneously adjusted flow
rates is presented in Figure 10.  Explanation of volumes and rates depicted in the Figure were not
                                              47

-------
                    Innovative Methods of Managing Environmental Releases at Mine Sites
                        PROCESSING PUNT
ttUCTOB
                                                                         FU HMtt
                          DISPOSAL/RCCUIM
                                                               ELECTROWINNINC
             Figure 9. Pinto Valley Miami Unit, Process Flow Diagram
                          Source: (McWaters, 1991).
                                    48

-------
                              Innovative Methods of Managing Environmental Releases at Mine Sites
                    PLS
                                                     L,No.2  ^J
    1786
                       79.5
              1886
Mass Flow  564.2
                                      8.8
                                                             1   ,:lc,
                                                                   48.32
                                                                  TK82
 7TAG
486-PP18
Copper Cities
          EXPIRED
                                                     PB81
                                                                                    58.14
          Figure 10. Pinto Valley Miami Unit, Computer-Controlled Tailings Reprocessing Operation
                                     Instantaneous Flow Rates
                    Source: (Print Out from Magma Computer Screen, October 28, 1992).
                                              49

-------
	  Innovative Methods of Managing Environmental Releases at Mine Sites

obtained.

Solvent Extraction
The pregnant solution pond (HDPE-lined) is fed by both the overflow from the first thickener and the
pregnant solution from the in situ operation (McWaters, 1991).  The 6,000 gpm combined flow is fed
into four "trains" of solvent extraction. Within the solvent extraction tanks, over 90 percent of the
copper is transferred into the  organic phase. The organic phase solution consists of a 7 percent (by
volume) liquid ion exchange agent (LIX* 984) in kerosene.

After loading, the organic phase is pumped through two trains of mixer/settler vessels in series that
cause the copper to transfer to an electrolyte. The barren organic is then returned to the extractor
vessels.  Magma uses the same SX/EW operation for reprocessed tailings and its in situ leach
operation.  There is no difference between the SX/EW operation for the reprocessed tailings solution
and other SX/EW plants in use at other copper sites.

Electrowinning
The amount of copper in the pregnant solution is concentrated approximately fifty fold in the process
of being transferred to the electrolyte. Prior to electrowinning,  the electrolyte is subject to flotation
to remove any entrained organic; additional  information on the type of flotation was not available.
The electrolyte solution is then heated using steam and the internal heat of electrolysis. Prior to
passing into the electrowinning tanks, particulates are removed from the electrolyte as it is passed
through a bedded filter. In electrowinning cells, the copper in the electrolyte is readily electro won
onto stainless steel cathodes.  The copper cathodes produced are normally shipped to Magma's San
Manuel facility for manufacture of copper rod.

Wastes
It is assumed that tailing reprocessing will continue as long as copper prices  warrant.  Ultimate
disposal of the reprocessed mine tailings is in the Copper Cities Deep Pit. The Copper Cities Deep
Pit is an abandoned, open copper pit approximately 700-feet deep. The bottom of the pit is  at 3250-
feet mean sea level (Figure 11). The pit will ultimately be filled to the 3760' level.  According to
Magma and its consultants, Dames and Moore, this disposal was made  possible due to the
hydrogeologically isolated location of the deep pit.

Waste generated from the tailings reprocessing system consists of the underflow from the second
thickener.  Four centrifugal pumps direct the underflow from the second thickener through a 4.7 mile
long pipeline to the Copper Cities Deep Pit. Magma worked with the U.S. Bureau of Land
Management and Inspiration Consolidated Copper Company to procure right-of-way easements.
The tailings slurry consists of 50 percent solids,  and is pumped at a rate of 2,710 gpm and has a pH
of 2 to 2.2. The 13-inch diameter, high density  polyethylene (HDPE) pipeline is placed in unlined
containment ditches, and operates at  a maximum pressure  of 360 psi.
                                               50

-------
                    Innovative Methods of Managing Environmental Releases at Mine Sites
Figure 11.  Pinto Valley Miami Unit, Copper Cities Deep Pit Well and Seep Locations
                       Source: (Dames and Moore, 1987).
                                      51

-------
                            Innovative Methods of Managing Environmental Releases at Mine Sites

After the tailings slurry is discharged, solids settle out in the Copper Cities Deep Pit. Barge pumps
located in the Copper Cities Deep Pit pump liquid from the surface back to the facility through 12
and 14 inch HDPE pipelines that parallel the slurry pipeline. The liquid returning from the  pit is
added back into the system at the mining supply stage, i.e., the monitors. The pipelines' pressures
and flows are monitored to identify and limit leaks within the system (McWaters, 1991).

According to Dames and  Moore (1987), because of the geology and faulted conditions that isolate the
area of the Copper Cities Deep Pit from surrounding rock masses, and the relatively high aquifer
level; water or other liquids placed in the pit will  not flow/commingle or contaminate the underlying
and surrounding aquifers.  EPA did not obtain additional information; technical review of the
hydrogeologic reports was not conducted.

Prior to initiating tailings reclamation at the #2 tailings pile, Magma was required to prepare a
Groundwater Protection Plan  in order to obtain the necessary permit from the State of Arizona.  The
permit states how full the Deep Pit may be filled.  There are five groundwater monitoring wells that
are sampled quarterly at the Copper Cities Deep Pit; data were not available for this review.

Costs
In 1981, a site-specific study  showed that 57 percent total copper recovery could be economical, but
that additional recovery would not be economically justified (McWaters, 1991).  Magma started the
operation in July  1989.  Details were not made available because of confidential financial business
information concerns.

In order to reprocess the  Miami #2 tailings, Magma had to expand its existing SX/EW plant and
refurbish two thickeners.  Capital expansions involved increasing the number  of electrowinning
tankhouse cells from 60 to 104. The plant was estimated to cost $19.6 million in 1988 (McWaters,
1991).  In order to run the plant continuously, handling  12,000 stpd of tailings, Magma needed  to
hire 23 additional people. Additional cost information was not provided.

Operating costs are 50 to 55 cents per pound of copper;  with depreciation, the cost is 84 cents per
pound.  According to facility personnel, this is one of the highest operating costs of any Magma
operation.  The cost of power is $100,000 per month. Initially, the electrical energy consumption per
pound of cathode copper was calculated by Magma to be 3.0 kwh. Additional operating cost
information was not obtained.

According to facility personnel, the Pinto Valley operation is essentially a closed loop system for
water usage.  Because there is a high evaporation rate in the area, 66+ inches annually, there is
speculation by some Magma representatives that towards the end of the life of the reprocessing
operation there may be a problem with excessive  evaporative loss from the surface of the Copper
Cities Deep Pit.
                                               52

-------
                            Innovative Methods of Managing Environmental Releases at Mine Sites

Benefits

The environmental benefit derived from the operation results from the removal of the tailings pile
located in a drainage adjacent to the town of Miami and redepositing the tailings in an abandoned
open pit in a relatively remote location. Information confirming whether this removal and redeposit
will provide a net environmental benefit was not obtained.  According to facility personnel, recently,
the operation has been economically profitable due to the recovery of copper and is expected to
continue to be profitable in the future.

Limitations
Limitations to Technology Transfer
Magma credits two reasons for success of tailings reprocessing at this facility: (1) the high
concentration and amount of copper that is present in the tailings, and (2) the tailings have had a long
time to oxidize,  thus making the copper more readily available.  Other sites may have a lower
percentage of copper in the tailings, which may make reprocessing less economical. Newer deposits
may also be less economical.

Additional copper recovery may be possible by extra oxidation, flotation or elevated temperature
leaching circuits, however, at Pinto Valley, they were not determined to be economically attractive.

Site-Specific Technical Issues
Some of the problems encountered at Magma's Pinto Valley tailings reprocessing operation have been
moving the hydromonitors around.  Placement of the monitors involves careful planning in choosing a
site where there  is an even mix of slimes and coarse grain material.  The high pressure hoses
experience frequent leaks and require constant attention.

A critical  factor  is the amount of time the slurried solution is in the tanks.  The consistency of the
slurry is another important operating parameter and is described as the slime  vs. coarse content of the
slurry.  For example, if there is  not enough slimes, the slurry sticks and does not flow smoothly
through the system.  If there is not a good mix of slimes and coarse grain then it is difficult to control
the thickeners.  In order to control the  grain mixture, Magma tries to keep two of the four monitors
in the slimes and two in a sandy area.

Magma reports that initially, there were start-up problems associated with the electro winning circuit,
and with the refurbished thickeners (details not provided).  Earlier attempts to mine and then slurry
the tailings by conventional methods proved unsuccessful in part because of clay balling.  The use of
a hydraulic monitoring system avoids clay balling by breaking down the strong clay bonds between
particles through use of the high energy, high pressure monitor stream.
                                               53

-------
                           Innovative Methods of Managing Environmental Releases at Mine Sites

There have been occasional releases and spills from the slurry pipeline system and Magma has
responded as necessary to such releases.

Conclusions

Since 1989, Magma has recovered copper from a waste source, its Miami #2 tailings pile at Pinto
Valley.  Recently, the operation has been economically profitable.  By reprocessing the tailings,
Magma is removing a large volume of waste that sits adjacent to the Bloody Tanks Wash, which is
perched on the edge of the town of Miami.


According to Magma facility personnel, the Copper Cities Deep Pit, where the reprocessed waste will
be disposed of, is a hydrogeologically isolated unit and that waste will not be in contact with  the
surrounding aquifers.  However, sufficient information to provide an independent evaluation of the
environmental impact of the final deposition of waste tailings is not available.


Contacts

Magma Copper Company
       Eldon Helmer
       Director of Environmental Affairs
       (602) 575-5600

Arizona
       Roger W. Kennett
       Environmental Program Supervisor
       Water Permit  Unit
       Arizona Department of Environmental Quality
       (602) 207-4697

References

Arizona Department of Environmental Quality.  1991.  Incident Report, March 15, 1991.

Arizona Department of Environmental Quality.  1989.  Inter-Office Memorandum from B.K.
       Thatcher Jr. to T. Levandowsky dated July 20, 1989.

Arizona Department of Mines and Mineral Resources.  1990.  The Primary Copper Industry of
       Arizona in 1989, Special Report No. 16, by Richard R. Beard, October, 1990.

Dames and Moore. 1987.  Hydrogeologic Evaluation: Disposal of Tailings in Copper Cities Deep
       Pit, for Pinto  Valley Copper  Corporation.

Hartman, Howard L.   1992.  SME Mining Engineering Handbook, 1992.  Society for Mining
       Metallurgy and Exploration Inc.

Magma Copper Company, Informational brochure. Undated.

Magma Copper Company, Pinto Valley Division.  1991. Spill Reports submitted to Arizona
       Department of Environmental Quality, June 1989 to March 1991.
                                             54

-------
                          Innovative Methods of Managing Environmental Releases at Mine Sites

Magma Copper Company, Pinto Valley Division.  1987.  Conceptual Notice of Disposal, Miami
       Tailings Mine Site.  Submitted to Arizona Department of Environmental Quality.

Magma Copper Company, Pinto Valley Division.  1987.  Groundwater Quality Protection Permit
       Application, Miami Tailings Reprocessing Project.

McWaters, T. 1991.  Developing Magma's Tailings Leach Operation.  Prepared for presentation at
       the AIME Hydrometallurgical Meeting, Spring 1991, San Manuel, AZ.

Site Visit, 10-28-92.  EPA Site Visit to Magma Copper Company, Pinto Valley - Miami Operation,
       Arizona, October 28, 1992.

Smith, H.C.  1991. Report of Abnormal Discharge Dated September 5, 1991.  Letter to Wayne
       Hood (ADEQ) from Harry Smith (Magma).

Smith, H.C.  1991. Response to 308-FY92-37 Letter Requesting Information, Letter to Harry
       Seraydarian (EPA) from Harry Smith (Magma).

Southwestern Pay Dirt.  1992.  "Produced 9 Million Pounds of Copper Last Year: Unique Hydraulic
       Operation is Recovering Assets, Removing an Old Dump", October, 1992.

U.S. Environmental Protection Agency.  1992. Findings of Violation and Order, Docket No. IX-
       FY92-08, issued to Magma Copper Company.
                                           55

-------
                          Innovative Methods of Managing Environmental Releases at Mine Sites

EPA Response to Comments
Magma Copper Company submitted written comments on this report to EPA in a letter dated July,
15, 1993.  Magma requested that minor editorial changes be made to correct factual information
regarding their operations.  EPA corrected the draft to incorporate all of Magma's recommended
changes.

The U.S. Bureau of Mines submitted comments.  These have been addressed as appropriate.
                                             56

-------
                            Innovative Methods of Managing Environmental Releases at Mine Sites

3.3  PIPE RECYCLING/REUSE
IMC operates eight phosphate rock mines and plants that cover an area of 115,854 acres in Polk,
Hillsborough, and Manatee counties in West Central Florida (this includes leased and owned land
under IMC's control, of which only portions are actively mined at any one time).  Phosphate rock is
the raw material used for the manufacture of phosphate fertilizer, animal feed supplements, and
industrial chemicals including phosphoric acid, trisodium phosphate, and sodium tripolyphosphate.
IMC's Florida operations have a capacity of 23 million tons per year, which is 13 percent  of world
capacity and 35 percent of U.S. capacity.

The climate, availability of water, topography, and physical characteristics of the deposit make the
use of large dragline excavators and hydraulic pumping systems the most economical mining method
to mine the phosphate zone, which consists of a mixture of phosphate, sand, and clay, normally
containing 20 to 25 percent moisture (collectively known as "matrix").  IMC operates up to 18
draglines (14 at the time of the site visit).  The draglines have a reach of up to several hundred feet
and buckets with capacities up to 65 cubic yards.  A dragline excavates a 200 to 400 foot wide
semicircular area before moving and mining the area it evacuates.  The ore or matrix, which is
typically 5 to 20 feet thick, lies under 20 to 40 feet of overburden. The dragline first strips the
overburden, placing it into adjacent mined areas for later use  in reclamation.  Alternatively, when
mining at the perimeter of an area that will later be used as a clay settling pond (whose cells are
typically about one mile square), overburden may be used  to construct the raised dams that surround
the pond.

Once the overburden is removed from over the matrix, the dragline excavates the matrix itself.  With
each bucketful, the dragline pivots and dumps the matrix from the bucket into a "well."  The well is
simply an excavation about 50 feet in diameter and 10 to 15 feet deep.  In the well,  two hydraulic
monitors blast the matrix with 10,000 to 15,000 gpm of water at 150-250 psi, which further breaks
up the matrix and forms a slurry. Water from the monitors is pumped through steel pipelines  from
clay ponds near the beneficiation plants.

After being blasted by the monitors, the matrix slurry passes through an 8-inch grizzly to screen out
oversize materials, which are further broken up by the monitors.  A pit pump lifts the slurry, which
has 30-40 percent solids, from the well into a steel pipeline at a rate of 1,800-2,000 gpm for transport
to the beneficiation plant.  Because the areas being mined and the beneficiation plants are some
distance apart-from one to over six miles as of mid-1992-a number of intermediate "lift pumps" are
necessary to keep the matrix moving through the pipelines at  about 19 feet per second.   The first lift
pump is generally within 1,500 feet of the well and additional lift pumps are placed  every 2,900 to
4,000 feet along the pipeline's length.  Because the dragline moves, the well, pit pump,  and the first
section of the pipeline (i.e., the section between the well and the first lift pump) are moved every
three to four days to allow the well to remain in the dragline's boom reach.
                                               57

-------
                            Innovative Methods of Managing Environmental Releases at Mine Sites

Once it reaches the beneficiation plant, the matrix is separated into clays, fine product, pebble
product, and oversized debris.  The two major wastes, tailings (which are fine,  well-sorted rounded
sands) and clay are transported to their respective disposal sites.  The tailings are transported by
pipeline to areas that will be reclaimed after mining is completed, and then used to backfill the mined
areas; they also may be transported and stored in piles prior to being used for such purposes as dam
construction. The clays-again as a slurry-are transported by pipeline to the onsite clay disposal
impoundment.  As can be seen, pipelines are used for nearly all materials that are transported on and
around IMC's operations.

Program  Description
IMC's waste minimization program that was the focus of EPA's examination involves the reuse  and
recycling  of the steel pipe that is used to transport matrix slurry, water, tailings, clay, and other
materials. At IMC's operations in July 1992, there were approximately 194 miles of steel and
polyethylene pipe in use and in inventory.

IMC obtains maximum  use from steel pipe in a number of ways:

    •  Pipe used for matrix and clay transport is periodically rotated to ensure that wear is evenly
       spaced over the  full diameter of the pipe
    •  To the extent possible, pipe no longer suitable for the most demanding use, in matrix
       pipelines, is then used in other less demanding pipelines, such as tailings or hydraulic
       pipelines

    •  Pipe no longer suitable for use in pipelines is  either used for other purposes (e.g., culverts) or
       sold for off-site  reuse or as scrap.

Table 3 shows the amount of the various types of pipe on hand in July 1992.  Information on how
much of the total inventory consisted of steel pipe and how much was polyethylene was not available.
Each year, IMC purchases approximately  183,000 feet (35 miles) of 3/8-inch thick steel pipe in 50-
foot sections.  The pipe has a 75,000 psi tensile strength, 45,000 psi yield strength,  and a Brinell
hardness of 180 minimum.  Pipe with varying diameters is purchased, with most pipe purchased in
1991 being  18-inch. The 18-inch size steel pipe is  the most  widely used, as can be seen in Table 4:
in 1991, 110,000 feet or 60 percent of all pipe purchased was the 18-inch size, but the amounts and
sizes needed reportedly varies from year to year. Table 4 shows the various sizes and uses as of
September 1992.
                                                58

-------
                            Innovative Methods of Managing Environmental Releases at Mine Sites

                Table 3.  IMC Inventory of Pipe In Use or Available,  July 1992
Type of pipe
Matrix
Hydraulic
Tailings
Feed
Debris
Waterjack
Overburden
Clays
Spare
Scrap
Purpose
Slurry from mines to plants
Water from clay ponds to mines
Slurry from plants to storage/ reclamation areas
In-plant, from washers to float plant
From old debris area to plant
Transport mine water from pit to system or discharge
Slurry from deeper mines (below where dragline can reach)
Transport clays from plant to clay ponds
Stored for use in pipelines-some new, some used
Stored for other on-site uses or sale to scrap dealer
TOTAL
Length (feet)
248,350
129,800
190,625
^_ 41,900
8,750
30,625
19,200
70,600
233,775
51,050
1,024,675
Once purchased in 50-foot lengths, IMC joins the lengths of steel pipe using one of two methods. If
the pipe is to be used in applications that will be subject to excessive wear or moving, IMC first
welds steel flanges to both ends of each length (an undetermined percentage of pipe is flanged).  The
flanges allow lengths of pipe to be bolted together, using 20 or more 1-inch diameter bolts, and then
unbolted for movement or replacement. Once a length of flanged pipe can no longer be used because
of wear or damage, the flanges are removed by IMC and the pipe itself may then be used for another
onsite purpose (e.g., as culvert) or sold to a scrap dealer.  Lengths of pipe that are expected to
remain in the same use throughout their useful lives, on the other hand,  are not flanged but are
welded together.  This occurs  with an undetermined percentage of the steel pipe.

Not all pipe is used at all times, even pipe not classified as "spare" or "scrap," since draglines and
mines may go out of service for short or extended periods and pipelines remain in place. The amount
of pipe used in any area also changes over time as different areas are mined, as draglines move,  and
as operations change. For example,  the specific operations underway at any one time affect pipe
usage:  overburden pipe is used only when mining deeper deposits that lie below a dragline's reach
(and is used to move the overburden that lies below the dragline's reach), and debris pipe is used to
mine material that was formerly disposed as debris from one or a few areas.

As Table 4 indicates, IMC also uses  various sizes of hard polyethylene plastic pipe.  Although less
expensive than steel, the plastic pipe cannot take the pressures necessary for matrix transport  due to
its 150 psi burst strength.  In addition, the plastic pipe is not as mobile and is more expensive to cut
and reattach than  steel pipe.  It also is much more responsive to  changes in temperature, becoming
                                               59

-------
                           Innovative Methods of Managing Environmental Releases at Mine Sites

                           Table 4.  Sizes and Uses of Pipe by IMC
Diameter
(inches)
8
10
12
16
18
20
22
24
30
32
36
40, 48
42
Type of pipe
Not determined
Not determined
Steel
Polyethylene
Steel
Steel
Polyethylene
Steel
Steel
Steel
Steel
Polyethylene
Steel
Polyethylene
Not determined
Steel
Polyethylene
Approximate
footage
1,000
1,000
34,000
18,000
328,000
131,000
33,000
104,000
8,000
< 1,000
7,000
3,000
50,000
Major Uses
(> 10 %)
Hydraulic (100%)
Feed (100%)
Matrix (51%)
Tailings (67%)
Matrix (32%), Tailings
(41%), Feed (12%)
Matrix (70%), Tailings
(21%)
Matrix (100%)
Hydraulic (94%)
Hydraulic (63%)
Clay (100%)
Minor Uses


Tailings (30%), Waterjack (6%),
Debris (13%)
Hydraulic (25%), Waterjack
(7%)
Waterjack (5%), Overburden
(6%), Hydraulic (4%), Debris
(<1%)
Hydraulic (<1), Waterjack (3),
Debris (2%), Overburden (4%)

Clays (4%), Waterjack (1%)
Waterjack (37%)

NOTE: Figures reflect pipe in use, July 1992, not spare pipe, scrap pipe, or pipe in inventory. Thus, the
total here does not match Table 1 since Table 1 includes those categories of pipe.
too inflexible and brittle for some uses in cold weather and too flexible for some uses in the heat of
summer.  In cases where pipe is laid more or less permanently,  and where the disadvantages are
overcome by economics,  however, plastic pipe has proved satisfactory. Each of the major uses of
pipe at IMC's central Florida operations is described below.

Matrix Pipe

Matrix slurry is pumped  from the well adjacent to the mine to the beneficiation plant in steel pipelines
at a rate of 19 feet per second.  The matrix,  which is basically one-third phosphate,  one-third sand,
and one-third clay, is mixed with enough water to ensure movement over the long distances necessary
(up to eight miles) to the beneficiation plant.  Because of the morphology of the matrix components
coupled with the line pressure, there is considerable scouring and wear on the inside of the pipe.
Scouring is most severe on the bottom quadrant of the pipe and  over a period of months can simply
wear through the  entire thickness of the pipe.  If not prevented or avoided, pipe failure interrupts the
                                               60

-------
                            Innovative Methods of Managing Environmental Releases at Mine Sites

flow of matrix to the plant and necessitates unscheduled and costly shutdowns. To obtain the
maximum length of service possible for matrix pipe while minimizing pipe failure, IMC has
developed a matrix pipe management program, which  involves the periodic rotation of matrix pipe.

IMC's matrix pipelines ranged from slightly over one  mile to 6.2  miles in length in September 1992,
and can reach eight miles or more depending on the area being mined.  The pipelines are made of
steel pipe 12, 18, 20,  or 22 inches in diameter, as shown in Table 5. The size is based on the rate at
which matrix is pumped from the mine(s) to the plant, which in turn is  a function of the capacity of
the specific dragline serving the mine (in some cases,  matrix from two draglines enters the same
pipeline). Each 50-foot length of matrix pipe is flanged on both ends; the flange on each end of each
50-foot length of pipe is joined to the flange on the next length by 20 or more bolts that are 1  to  1.5
inches in diameter.

                  Table 5.  Size and length of matrix pipelines  (September 1992)
Mine
Noralyn
Phosphoria
Kingsford
Haynsworth
Four Comers
Hopewell
Clear Springs
Number of
draglines
2
2
4
2
4
1
2
Size pipe
(inches in diameter)
18 inches
20 inches
18 inches
18 inches
22 inches
20 inches
12 inches
20 inches
TOTAL
Length of
pipeline(s)
21,250 feet
23,300 feet
47,650 feet
37,700 feet
32,800 feet
43,650 feet
17,400 feet
24,600 feet
248,350 feet
During the service life, sections of matrix pipe are turned three times to encompass four positions.
The first roll is 180°, the second roll is 90°, and the third and final roll is 180°. This ensures that
each quadrant of the pipe is subject to more or less equal scouring and wear.  The sections of bolted
50-foot lengths that are tracked and rotated together consist of the sections between lift pumps, which
can be several thousand feet, as well as shorter sections across streams or under roads.

IMC has developed a computerized model to predict the amount of tune a section of pipe can remain
in each position and when it needs to be turned.  This is based on the specific matrix being pumped,
the  pipe size, and other factors: the key variable for each pipeline is the amount of matrix pumped
through the pipeline, in millions of cubic yards.  Pipe used in the Hopewell pipeline, for example, is
estimated to have an average life of four to seven million cubic yards, while the Four Corners line is
expected to allow an average of 20 to 25 million cubic yards to be pumped before replacement.  The
                                              61

-------
                            Innovative Methods of Managing Environmental Releases at Mine Sites

actual length of service can range from 15 months to over two years, depending on the amount and
nature (e.g., pebble content) of matrix pumped through the pipe.  Under ideal circumstances,
according to IMC, matrix pipe would be worn from its original 3/8 inch thickness (0.375 inches) to
0.009 inches at the four thinnest spots in its circumference (i.e.,  at the four locations that had been at
the bottom) after a full rotation schedule.  In practice, this ideal pattern of wear may not be
attainable, although the rotation schedule does allow greatly extended  service (for example, if pipe is
worn through in its first position, IMC would only have gained one fourth of the  maximum use that
the length of pipe could otherwise provide). IMC's database contains information, on each section of
pipe in each matrix pipeline, the amount of matrix that has been pumped through each section and the
date(s) on which the section has been rotated.

When each section (this typically means the section between each pumping station, up to several
thousand feet) of pipe is laid, the installation date is recorded and a code to indicate the pipe's
position (i.e., how many times, if at all, it has been turned) and  the date is painted directly on each
50-ft length in the section. This information is then entered into IMC's computer program. Each
month, IMC issues a monthly yardage statement that inventories the pipe at each  mine and indicates
which sections of pipe are due to be rolled and when.  This is based on the amount of matrix that has
been pumped through the pipe, with about one-fourth of the "yardage life" allocated per quadrant.

When the turn date approaches, or when field measurements or judgment indicate that pipe should be
rotated, the line foreman awaits a routine  shutdown (generally, the beneficiation plant shuts down for
eight hours every three weeks for routine  maintenance, and there also are other unscheduled
shutdowns that may provide opportunities) so that the pipe section can be turned  without disrupting
operations.  Because of the weight of the pipe,  a specially modified piece of equipment is used.
When the pipe has been rolled, a new code and position marker  are painted on each 50-foot length of
pipe in the section and the information is  recorded to ensure an accurate inventory.  While the rolling
schedule is pre-established based on the model's predictions, unforeseen circumstances (e.g., ruptures,
leaks) can require that a section of pipe be rolled sooner or later than planned or be replaced.  Thus,
an aggressive field program is critical to IMC's operations: line crews  inspect and measure the
remaining thickness of pipe with a calibrated sonic sensor to assess the degree  of wear (the schedule
of inspection/measurement was not determined) and the results of these measurements often requires
early rotation or replacement.   When individual lengths of pipe within a section require replacement,
the remaining lengths of pipe in the section are used in "mixed pipe"  sections,  as described below.

Rolling a section of matrix pipe is not a trivial task.  Each 50-foot length of pipe in a several
thousand foot section must be unbolted from its neighboring length, turned 90  or 180 degrees
depending on the schedule, realigned with connecting lengths, and rebolted.  This all must occur
within the relatively short scheduled downtimes, which generally are  about eight hours, and several
sections  may require rolling during  these  short periods.  Thus, the entire exercise is carefully planned
and  executed by IMC.
                                                62

-------
                            Innovative Methods of Managing Environmental Releases at Mine Sites

In general, pipe nearest the dragline/well is subject to the most wear, with wear decreasing with
distance from the mine (this is the result of coarser materials being broken up as they travel through
the pipeline and thus subjecting the pipe to somewhat less wear).  The first section of pipe in each
matrix pipeline, the one running between the well and the first lift pump, is not only subject to
especially heavy scouring but also must be moved periodically to accommodate the moving dragline
and well.  This frequent handling often damages 50-foot lengths of this section:  besides the risks
inherent in moving such pipe (new 18-inch pipe weighs about 72 pounds per foot, or 3,600 pounds
per 50-foot length), after such pipe has been rolled one  or more times, portions of it are less than full
thickness and is much more subject to bending or other damage when being lifted and  moved.  Thus,
individual 50-foot sections of pipe in the first  section often require replacement.  Because IMC rotates
entire sections of pipe at one time, and because this can be accomplished only with equal-age sections
(i.e., sections with equal-age 50-foot lengths), the first section of matrix pipelines is generally
composed of what IMC calls "mixed pipe" (which generally consists of lengths of pipe from sections
that were previously broken up, as noted above).  It was not determined how IMC establishes a
rotation schedule for "mixed pipe" sections, although it may be based entirely on line crew
inspections.  (Because these sections are typically within the disturbed areas near the draglines, IMC
noted that failures in these sections could present more  operational than environmental problems.)

After a section  of matrix pipe is sufficiently worn in its fourth position, the pipe section is scheduled
to be replaced.   When the operation is shut down, as noted above, the pipe is replaced with new pipe.
All or some of the 50-foot lengths of the pipe may then be made available for use for other purposes,
depending on the structural integrity of the pipe.  Pipe that is still fairly strong, for example, may be
used for water or tailings transport.  Otherwise, it may  be used for culverts or other on-site purposes
or sold for reuse or recycling.  Information on the amount and proportions of matrix pipe that are
reused in other applications was not available, although IMC did indicate that "most" has some reuse
potential.

Tailings Pipe
Since the tailings consist of a sand slurry, much less scouring of tailings pipe occurs since the sands
are well weathered and graded (rounded), which reduces the amount of scouring.  Of the 190,625 feet
of tailings pipe, an undetermined amount is polyethylene.  Of the steel pipe, some has previously
been used for matrix transport (the percentage was not available).  Previously used matrix pipe is
used for tailings transport only within the actual tailings disposal area, where failure of the pipe would
not release tailings to undisturbed areas. After use for tailings transport, which can be for six years
or more, if the  pipe still has structural integrity, it may be used to transport water, or  it can be sold
as scrap, sold as piping, or used for culverts onsite. No information was obtained on the amount  of
tailings pipe that is reused or recycled,  on-site or otherwise.
                                               63

-------
	Innovative Methods of Managing Environmental Releases at Mine Sites

Clay Pipe

Only large pipe is used for clay transport (nearly all is over 32 inches in diameter, as shown in Table
2).  Some pipe lengths are flanged similarly to matrix pipe, and others are butt-welded into long
sections; information on the amounts and proportions  that are flanged was not available.  Clays also
scour the inside of pipe a  certain amount, but the wear is more evenly spread than in matrix pipe.  As
a result, flanged pipe used to move clays is rotated  twice, so that  clay pipelines occupy three positions
during their lives (except butt-welded pipelines, which remain in the same position and are not
rotated).  Apparently, the  clay pipe rotation schedule is less well developed than the  matrix schedule-
at least, IMC did not provide information on the rotation schedule.  After pipe used  for clay transport
reaches the end of its useful life, which is generally after three to ten years of service, it is sold as
scrap or for piping, or used as culverts, depending on the degree  of wear.  No information was
obtained on the amount of clay pipe that is  reused or recycled, on-site or otherwise.

Water Pipe
A total of 129,800 feet of pipe is used  to transport water from the clay ponds  to the  wells adjacent to
each dragline; as  Table 2  indicated, many different  sizes  of pipe are used.  IMC indicated that at least
some hydraulic pipelines contained lengths  of hard polyethylene pipe as well as steel pipe.  These
hydraulic lines, as might be expected, experience relatively little wear.  The end nearest the draglines
do require  moving as the wells move, so some pipe in these areas is occasionally damaged.  Because
it is the least demanding use, much of the steel pipe used in hydraulic pipelines has been used for
other purposes previously; an undetermined amount of the 129,800 feet has been used for other
purposes.   Lengths of pipe in hydraulic lines are often welded together, although some sections,
including those nearest the draglines, are flanged. No information was obtained on the amount, if
any, of hydraulic pipe  that is reused or recycled, on-site  or otherwise.

Other Pipe Uses
As shown in Table 3, pipe is used for a number of other purposes by IMC. These include in-plant
feed pipe from washers to flotation circuits, debris  pipe,  waterjack pipe, and overburden pipe.
Although some portions of these lines consist of previously used pipe, the precise amount was  not
determined.  In addition, IMC has over 233,000 feet of "spare" pipe in inventory, ready for use in
pipelines.   Some  of this is new pipe, but much has  been  used for other purposes previously.  Finally,
IMC's mid-1992  inventory showed over 50,000 feet of scrap pipe on hand, ready for off-site sale.

Flange Reuse/Recycling
IMC purchases new steel  pipe and attaches recycled flanges through an assembly-line welding
process.  Pipe that is to be sold as scrap or as piping  first has its  flanges cut off. A service contractor
picks up the flanges, removes the welded pipe section, cleans  the flange, and returns the cleaned
flange back to IMC for reuse on new piping. Because the flanges are not subjected  to scouring, they
have a significantly longer service life.
                                               64

-------
                            Innovative Methods of Managing Environmental Releases at Mine Sites

Off-site Reuse and Recycling
Matrix pipe and other pipe that can no longer be used for materials transport (e.g., the pipe is worn
out, thinned too much, bent, or broken) is sent to a staging area.  At the staging area, any undamaged
portions of pipe are removed.  These portions can then be either reused onsite  as culvert or sold to a
local scrap dealer as useable pipe (reportedly for culverts,  fence corner posts, gateposts, and low-
volume water pumping).  Damaged pipe is sold to the scrap dealer to be remelted into other steel
products.  A single contractor takes all the pipe except for that reused onsite.   IMC reported that
reusable pipe fetches a higher price than pipe sold for scrap.  According to IMC, pipe scale has not
proved to be a problem.  The scouring experienced  in matrix  pipelines prevents any buildup in pipe
used for that purpose.  Some clay lines may experience sufficient ferrous oxide scaling to impede
flow somewhat, but rotating the pipe allows any buildup to be scoured.  IMC indicated that water
lines generally do not experience a significant buildup and in  no  cases is buildup serious enough to
impede flow.  No information was obtained on scaling in tailings or other lines.

No information was obtained on the occurrence of naturally occurring radioactive materials (NORM)
in IMC pipe or scale.   The Florida Department  of Health and Rehabilitation Services (HRS) regulates
some scrap dealers because of concern over NORM but does not regulate radioactive materials at
mineral operations (i.e., mines).  According to HRS, there have  been isolated problems with various
isotopes (of uranium,  thorium, and  radium, particularly radium-226 in metal) from phosphate mining,
but there was no indication that this was true of IMC operations.  Scrap dealers that do not have an
HRS license (which is required, for example, if they do handle 15 pounds or more of radioactive
material at any one time) are not required to monitor for NORM and are inspected or otherwise
monitored by HRS on a case-by-case basis (e.g., as the result of a tip or complaint).  It was not
determined if the dealer who receives  IMC pipe is licensed by HRS.

Costs and Benefits
Piping represents a significant operational cost to IMC. For example, in 1991, 183,000 feet (35
miles) of piping was purchased at a cost of $5.5 million.   Expenditures for pipe would be
dramatically greater if the piping were not reused or recycled. The cost of new pipe (1991) averages
about $38 per foot. By reusing pipe onsite, IMC estimates that approximately  $1.5 million is saved
each year. IMC does not track the cost of the pipe  rotation program,  so the costs of implementation
were not available.

Most pipe that is sold to the area scrap dealer for reuse as pipe fetches approximately $1.50 per foot
although  scrap pipe that is still round fetches up to $2.25 per  foot. In 1991, $316,000 was received
for pipe that could be reused offsite. Finally, 4,200 tons of scrap piping was sold (for remelting) at
the market price of about $10 to $20 a ton, or an estimated total of $42,000 to $84,000.  Other reuses
on site (e.g., culverts) have not been calculated,  but certainly  result in a cost savings. The hard
polyethylene pipe is not recycled.
                                               65

-------
                            Innovative Methods of Managing Environmental Releases at Mine Sites

Although not quantifiable, costs avoided are a direct benefit of IMC's pipe management program.
That is, pipe that is properly inspected and/or is rotated on time is less apt to suffer from excessive
deterioration and subsequent failure.

Other Waste Minimization Activities
IMC reported that the pipe flange recycling program results in an estimated 60 to 80 percent cost
savings  over purchasing new flanges (amounts were not available).  This cost savings takes into
account the costs of having a contractor pick up, clean, and deliver the recycled flanges.

In addition,  IMC is assessing the potential to recycle pump shells.  Each matrix lift pump has a useful
life of approximately seven months.  The shell, which comes  into contact with the matrix, and is
subject to heavy wear, is a cast alloy of molybdenum, nickel, and chromium.  It is possible that the
shells may be melted and recast, thus realizing potentially significant cost savings.

As noted above, IMC uses "flexibles" as connections between various pieces of equipment, wells,
pumps,  and  piping. Many of these flexibles cannot be reused because of their unique configuration.
Although they could be resold as scrap, IMC has donated these pieces to environmental groups to be
used as  artificial reefs in estuaries.

Conclusion
The pipe reuse/recycling program at IMC  was reported to be  necessary to ensure and/or enhance
economic profitability.  IMC originally introduced the program more than ten years ago solely for
economic reasons.  The program reduces capital expenditures (i.e., reduces the amount of pipe that
must be purchased) as well as  operating costs (i.e., by avoiding costly shutdowns when pipes fail).
IMC staff are currently seeking to improve the pipe management system by further automating the
system.  To improve efficiency of the system, for example, IMC intends to establish a more accurate
inventorying/tracking system of the miles  of pipe,  particularly pipe not in use.  IMC indicated that
they needed to refine the system of determining  where certain sections are, the amount of wear
sections have experienced (e.g., by including field measurements or other data in the pipe rotation
calculations), and projecting future uses of certain  sections of pipe. While the current method
involves painting codes on each pipe length and maintaining a computer database that tracks each
section, IMC indicated they were considering a project that would assess the feasibility of a bar code
system; it was hoped that  such increased automation could reduce  labor costs and increase  the
efficiency and accuracy of the system by extending the automated tracking system to individual pipe
lengths  and  by increasing  the amount of information on each  length and section.

Contacts

IMC Fertilizer
      Janet  Roth
      Manager,  Public Affairs
                                               66

-------
                    Innovative Methods of Managing Environmental Releases at Mine Sites

(813) 646-5061

Jay Allen
Manager, Environmental Affairs
(813)533-1121

Ron Hartung
Manager, Mobile Equipment
(813)533-1121

Bob Brossart
Chief Engineer
(813)533-1121
                                      67

-------
	   Innovative Methods of Managing Environmental Releases at Mine Sites




EPA Response to Comments



The U.S. Bureau of Mines provided comments, which have been responded to as appropriate.
                                           68

-------
                            Innovative Methods of \fanaging Environmental Releases at Mine Sites

3.4  RECYCLING MINE TIRES
Heavy equipment at mine sites using these large tires include earth movers, graders,  and loaders.
The  tires vary in size  depending on the type of equipment, ranging in size from five  feet to more than
ten feet in diameter and two to three or more feet in width.  These vehicles typically endure long
hours on unpaved roads, and in the case of haul trucks, operate up to 24-hours per day. Tire
manufacturer and mining industry personnel refer to this type of tire as off-the-road,  off-highway, and
giant.  For this discussion they  will simply be referred here  to as large tires.

Data on the number of large tires scrapped each year are not widely  available.  However,  the Rubber
Manufactures Association (RMA) does maintain sales statistics on "Off-The-Road" tires (these
statistics include a wide range of non-standard tires).  According to the RMA, 284,967 OTR tires
were sold domestically in 1992.  Of these,  15,526 tires had  a rim diameter of 48  inches or more.
Tread  life of large tires and the rate at which scrap tires accumulate  are important variables to
consider when assessing alternatives.

Diligent maintenance  practices increase tire life resulting in  fewer scrap tires.  Also,  a strong
incentive to properly  maintain tires and road surfaces is the  cost of new tires.  For example, mine
representatives have estimated the price of one large tire to range from $10,000 to $16,000, or over
$100,000 to fit one large piece of equipment (Rayrock Yellowknife Resources Inc. 1992).   The
Barrick Goldstrike mine, moving 315,000 tons of ore per day, purchases an estimated 300 to 400 new
tires (all sizes) per year (American  Mines Handbook 1992, American Barrick Resources, Inc.  1992).

Economic variables that affect the potential for resource recovery include primarily the availability of
markets, sources of supply, and costs associated with generating a marketable product.  Two major
impediments to the recycling of mine vehicle tires are  the distance to existing resource recovery
markets and the size of these large  scrap tires.  In particular, large mining operations are not usually
located near their potential markets in larger cities. Encouraging exceptions to this relationship are
sand and gravel and crushed stone operations.  Also, tires from facilities may be  suitable for use as
either tire derived fuel (TDF), or as construction material.   At least  two companies in Minnesota
process scrap mine tires from the iron range for profit. For remote  mine location, some ingenuity
and  encouragement may be necessary to find or develop markets.

Two new Federal regulations will increasingly effect the scrap tire industry markets.  The new Clean
Air  Act Amendments have redefined TDF as a fuel, no longer considering it a waste fuel.  Indications
that this and other regulatory driven changes will increase the demand for TDF are already visible.
In 1990, about 10 percent (27 million) of the scrap tires were used as TDF or in  civil engineering
application.  In 1992, about 27 percent, or 65 million  scrap tires were used.  Projections for 1994 are
that 50 to 55 percent of scrap tires, or 141 million tires, will be needed to meet market demand.
According to the Scrap Tire Management Council (STMC), the market  is just starting to takeoff.
Similarly, the Intermodal Surface Transportation Efficiency Act (ISTEA) requires that five percent of
                                               69

-------
                            Innovative Methods of Managing Environmental Releases at Mine Sites

all Federally  funded road projects use rubber from scrap tires in 1994.  Use of scrap tires must
expand five percent annually until  1997,  when it tops out at 20 percent.  By 1995,  17 million scrap
tires will be required in Federal road projects; by  1997 the number increases to 50 million.

Recycling and resource recovery alternatives address both whole tire and processed (reduction in size)
tire options.  Whole tire recycling includes retreading, for example; whole tire resource recovery
includes all civil engineering applications, and tire derived fuel (TDF).  Processed tires are sheared or
shredded for  use in civil engineering or as TDF.  This report provides information on these and other
alternatives to disposal of large mining tires.

Management Options Scrap Large Tires

This Section  discusses several recycling/resource recovery alternatives for scrap large tires that are
currently available to mining companies.  Retreading whole tires seems to be the most promising
option for  large tires.  However, the market for processed tires of any size is increasing according to
the Scrap Tire Management Council.  Most of the demand will be for TDF and in civil engineering
needs.
Recycling Options for Whole Tires
Several alternatives for recycling or reuse of whole large tires exist.  One alternative is retreading the
tires for reuse. Market indicators show a recent increase in truck tire retreading (EPA 1991).  There
are also a number of other potential uses for whole tires that are discussed below.
Retreading:
Tire retreading reduces the demand for new tires and thus conserves resources; retreading  a used tire
requires less  than 40 percent of the fossil fuel used to manufacture a new tire (Getz and Teachey
1992).  A  worn tire may be retreaded provided the tire is not overworn and still has a good casing.
Retreaded  tires typically have manufacturer guarantees and performance ratings comparable to new
tires (Getz and Teachey 1992).  The Tire Retread Information Bureau (TRIB) reported that retreaded
truck tires  may deliver more miles than new truck tires (Getz and Teachey 1992).  In fact, most truck
tires are designed  to be retreaded (Martin 1991).  The purchase price for retreaded tires is less than
new tires,  providing an additional savings incentive.

Mining companies may be able to access the tire retreading market through their current tire vendors
who may be  willing to accept used tires  suitable for retreading.  Depending upon their condition and
suitability  for retreading,  some vendors may offer reimbursement for used tires (Rayrock Yellowknife
Resources, Inc. 1992). Other vendors may still require payment for scrap tire removal. Cobre, a tire
vendor for the Dee Gold Mine, performs evaluations of used tires on site to determine each tires
potential for retreading. If a tire is retreadable, Dee Gold mine is reimbursed $500 per tire.
However,  if the tire is unsuitable for retreading,  Cobre will  remove the tire from the site for no
                                                70

-------
                            Innovative Methods of Managing Environmental Releases at Mine Sites

additional fee.  The primary limitations to retreading large tires are costs to transport tires to a
retreading facility and the market potential for retreaded tires.
Other Whole Tire Reuse Options
In addition to retreading, whole scrap tires are used in civil engineering applications, including
construction, erosion control, and agricultural uses.  However, the potential for reuse of whole large
tires in any of these applications depends  on proximity of the mine to the user since transportation
costs increase with distance.  With the exception of retreading, all of the potential markets for whole
tire reuse appear to be small in comparison to recycling/resource recovery markets for  shredded tires.

Construction: Waste tires can be used to build artificial reefs and breakwaters. Though a popular
method of reuse in the 1970's,  minimal numbers of scrap tires are currently being used to construct
artificial reefs; most of the tires being used for this purpose are passenger car tires.  The demand is
met by local supply.  Other uses include tieing scrap truck tires together to make  heavy rubber mats
("Terra Mats") for use as temporary roads for heavy trucks.   Construction, logging, and oil and gas
industries may find terra-mats particularly useful (BioCycle 1991). Some whole tires are used as play
equipment (EPA 1991).

Erosion Control: Scrap  tires are used as  erosion control devices in highway construction projects to
stabilize soils on disturbed slopes.  They  are low cost alternatives jto other erosion controls,  such as
rock, gabon, and concrete.  However, the demand is limited with fewer than  10,000 scrap tires per
year used as erosion control devices. The large size of mine  tires may discourage their use  for this
application (EPA 1991).

Agricultural  Uses:  In the mid-west, the agricultural industry has found a use for  large scrap tires by
splitting them in half to create livestock feed troughs.
Resource Recovery Options for Processed Tires
Processing scrap tires increases the options for resource recovery and thus the number  of potential
markets.  The major market for processed tires are as TDF and hi civil engineering applications. In
1991,  10 percent of all tires scrapped were used, in 1994 this number is projected to grow to 50 or
55 percent (STMC  1993).  Processing involves shearing, cutting and/or shredding tires into smaller
pieces.  Processing tires on-site may reduce transportation costs by 30 to 60 percent. According to an
EPA estimate, transportation costs for 100 whole tires ranges from $.15 to $.20 per mile.  In
contrast, transportation costs for processed tires range from $.045 to $.12 per mile (EPA 1991).
Transportation cost estimates for large tires from mining facilities were not available.
Large Tire Processing
There are approximately 200 commercial shredders operating in the United States that  accept used
tires for shredding.  The only states in which there are no commercial shredders are North Dakota,
South Dakota, Rhode Island, Delaware and Alaska.  In order to shred most whole large tires, a
                                                71

-------
                            Innovative Methods of Managing Environmental Releases at Mine Sites

shredder must be custom built.  Typically, costs for shredders are based on the size of the item to be
shredded. A representative from one of the companies that supply shredding equipment indicated that
used shredders (size not specified) are available for sale, or lease, and would be less costly than new
equipment.  A representative from Bridgestone/Firestone recommended that mining companies
explore leasing options for shredders,  since the volume of scrap tires generated at mining sites is not
sufficient to warrant purchase of a very  large shredder.

A cost effective  alternative to a large custom shredder may be shears used to cut large tires into
pieces more suited to a standard size shredder.  One company manufactures mobile shears which
attach to the hydraulic articulated arm of an excavator type Caterpillar.  These shears have been used
in the past to snip steel I-beams and can be used to reduce large tires down to manageable size.  The
shears are powered by the hydraulic system on standard mining equipment. They are more portable
than shredders and generally less expensive.   Reducing the size of large mine tires by shearing may
address some of the problems associated with size and handling difficulties.

Capital/Operating Costs for  Processing Equipment:  Although the Agency does not have accurate cost
data, in general, shear costs increase with tire size and operation costs increase with tire size.

Markets For Processed Tires
Markets for processed large tires include major energy users  as well as those  for construction
applications.  Heat energy from TDF  is currently being used  by power plants and cement kilns, both
energy intensive industries.   Incentives in the Clean Air Act Amendments and ISTEA will encourage
these markets to develop in  the future.  Three categories of processed tire markets are discussed
below: use as TDF; crumb rubber; and pyrolysis.

Use as Tire Derived Fuel (TDF):  Scrap tires are an excellent fuel source.  Rubber tires average
between 12,000 and 16,000 BTUs per pound, or about 80 percent as much as crude oil (EPA 1991).
A scrap tire (weighing 20 pounds) from a standard vehicle contains as much energy as 2.5 gallons of
gasoline. According to one source, the energy value per ton  of tire is approximately 30 million Btu,
which is 50 percent more than an equivalent weight of coal (Mecozzi 1988).  In recent years, there
have been major increases in the use of scrap tires as fuel by a number of industries, including power
plants, cement kilns, pulp and paper mills, and tire manufacturing facilities.

Some facilities burn TDF mixed with another fuel such as coal; others burn only TDF.  For some
uses, the steel cable beading and belts must be removed, increasing costs.  While most facilities burn
shredded rubber, some  incinerators are capable of burning whole tires.  Whole tire incinerator
combustion chambers are typically best suited to conventional sized tires; large mine tires may not be
compatible in the combustion chamber. Consequently, large tires usually need to be reduced in'size
 for use as TDF.
                                               72

-------
                            Innovative Methods of Managing Environmental Releases at Mine Sites

     r Plants:  Existing steam electric plants can be adapted to burn tires in place of, or in addition
to, traditional fossil fuels such as coal,  oil and natural gas.  According to a Goodyear representative,
cyclone boilers, wet bottom boilers, and other systems at fossil fuel-burning power plants can be
retrofitted to burn used tires for  less than $1 million dollars.  For $450,000,  Ohio Edison retrofitted
one of its oldest coal-fired steam electric plants, making it capable of burning six million scrap tires
per year.  Some power plants are built  specifically to burn whole tires to convert waste to energy
such as those operated by Oxford Energy of New York.  Another company, Continental Power
Systems, has plans to build a similar tires-to-energy plant in Ohio (Cooney and Davis, undated,
Mattheis 1988).

Oxford Energy operates a number of whole tire-to-energy facilities throughout the country.  The
largest of these plants is their Sterling,  Connecticut facility, which is capable of burning 9-10 million
tires per year, generating 26.5 megawatts of power (EPA 1991).  Most of Oxford Energy's plants
accept whole tires, but the tires.must be less than 48  inches in diameter.  The Sterling plant also
accepts shredded tires. Factors involved when weighing the feasibility of tire to energy facilities
include ample supply, buy-backs from utilities, and controlled air emissions (EPA 1991).

Cement Kilns:  Cement kilns must maintain a very high temperature (2,600 °F) during the calcining
phase, making them well suited to burning TDF.  Ash from the combustion process is typically
incorporated into the cement product. Of the cement kilns operating in the United States, about 50
are equipped with precalciner/preheaters that make them best  suited for burning TDF. According to
statistics compiled by EPA, seven cement  kilns are currently using TDF successfully in combination
with other fuel.  This number represents an increase in TDF use by cement kilns, with only four
operating in 1989, and is an indication of a growing market.  The primary limiting factor to this
expansion is the current low cost of petroleum-based fuels.  (EPA 1991)

Pulp and Paper Mills: For relatively low capital costs, pulp and paper mill furnaces can be retrofitted
to burn tire chips in place of wood chips.  There are approximately a dozen pulp and paper mills
(concentrated in Washington, Oregon, and Wisconsin) burning TDF in the United States according to
1991 data.  Like cement kilns, pulp and paper mills may be discouraged from retrofitting due to the
low cost of alternative fuels.  In addition, because the wire in TDF tends to clog  the feeding system,
some mills will only use wire-free TDF, which costs more (EPA 1991).

Crumb Rubber:  Crumb rubber is made by reducing the tire size either mechanically or cryogenically,
using liquid nitrogen, into 3/4 inch tire chips (EPA 1991, Martin 1991).  The source of the rubber is
tire buffings and peels obtained from retread shops.  Making crumb rubber requires the removal of
steel wires and polyester fragments contained in the tires.  Primary uses of crumb rubber include the
production of rubberized asphalt and miscellaneous rubber products.

Rubberized Asphalt:  There are two basic types of asphalt that use processed tires:  rubber modified
asphalt concrete (RUMAC) and asphalt rubber. RUMAC is produced by combining crumb rubber in
                                               73

-------
                            Innovative Methods of Managing Environmental Releases at Mine Sites

place of aggregate or stone in asphalt paving mixtures.  Before it can be used as aggregate, wire and
polyester must be removed from the rubber.  Asphalt rubber is produced by mixing crumb rubber
with asphalt at high temperatures and is often used to make and repair damaged road surfaces (Getz
and Teachey  1992).  The addition of rubber in either of these asphalt products improves their
longevity, strength, and wear properties such as  skid resistance and de-icing (Cooney undated,
BioCycle  1989).  The use of rubberized asphalt for highway construction is currently being evaluated
by several states and the federal government.

Rubber Products:  Crumb rubber is incorporated into a variety of rubber sheet and molded plastic
products,  including floor mats, vehicle mud guards, garbage cans, athletic surfaces such as running
tracks  and rubber play surfaces, and carpet padding (EPA 1991).  Crumb rubber may be used in
place of asphalt or wood timbers as a road surface adjacent to railroad crossings. Although the initial
cost to produce rubber railroad crossings is higher than that for asphalt or wood, one manufacturer
claims that rubber railroad crossings may last up to 15 years longer (EPA 1991).

Pvrolysis:  Pyrolysis involves subjecting used tires to high temperatures in order to chemically
decompose the tires into their primary components of oil, carbon black, and gas. To date, this
process has not demonstrated commercial success, hindered by the  low cost of oil and the soft market
for carbon black (Cooney and Davis, undated).  Additionally, the carbon black must be upgraded to
be marketable, which further increases cost of the product (EPA. 1991).

According to data compiled by EPA, only one commercial pyrolysis plant was operating in the United
States in  1990, although several other companies were experimenting with the process (EPA 1991).
While pyrolysis may not presently represent a viable market for large mine tire recycling, the market
may expand in the future.

Texaco, Inc. has tested a method using tires and waste oil as feed stocks in a multistage process to
make  electricity cleanly.  Texaco believes the process is both technically and economically feasible.
By-products include gas and light oil for refining and steel for recycling.  In the process, tires are
heated in an oil bath to 700 degrees F.  This melts the rubber from the steel belts and produces a
thick oily slurry that can be gasified.  In the gasification reactor the slurry is converted into gases and
 sulfur, as well as some ash and slag. (Wald 1992)

 Conclusions
 There are several recycling/resource recovery alternatives available for managing scrap tires at mine
 sites.  In the past, recycle markets were essentially non-existent and landfilling was the most effective
 form  of tire disposal.  While whole large tire recycling options are limited, markets for processed
 tires may offer cost effective options for resource recovery.  Markets for TDF and other processed
 rubber products are available and growing (STMC 1993). Some of this expansion is a result of
 changes in Clean Air and  other Federal regulations.
                                                74

-------
                            Innovative Methods of Managing Environmental Releases at Mine Sites

Two major impediments to pursuing these alternatives include the distance to recycling markets and
the large size of these scrap tires.  The costs associated with scrap tire recycling or resource recovery
and proximity of the mines to markets will be significant factors  in determining the overall  viability of
these options.  The economic feasibility for the options presented here is not readily available and
must be taken into account.  In addition to economic considerations, the potential environmental
impacts on air quality from burning waste tires should be considered.

Several mines in a region may consider sharing one set of shears and/or a portable shredder thereby
reducing capital  and operating/maintenance costs.  Use of a tire shear in conjunction with a standard
size shredder on site could produce a marketable  resource.  Once reduced in size,  tire pieces are more
easily handled and less expensive to transport off-site than whole tires.  They would also be more
acceptable in existing commercial markets.  For example, the product could be suitable for  direct sale
to the TDF market.  The decision to purchase shearing or shredding equipment would be based on a
solid understanding of market prices for used tires, the distance to markets, and the number of tires
needed to cover  equipment costs.

Several on site alternatives to disposal may exist for scrap tires.  Whole tires may be used to construct
temporary road surfaces, similar to the "Terra-Mats".  Processed tires could be used in rubberized
asphalt for building new access roads in an area where mining is concentrated.   This would require
cooperation between mining companies and an asphalt supplier. .Alternatives must be  analyzed on a
site-specific basis, weighing the cost of equipment against the number of used tires generated per year
and the distance to and  availability of potential markets.
                                               75

-------
                          Innovative Methods of Managing Environmental Releases at Mine Sites

References

BioCycIe,  1991 (July). "Scrap Tires and Temporary Roads." BioCycle. Unauthored, 41.

BioCycle,  1991 (April)  "Scrap Tire Recycling: What's the  Future for Rubberized Asphalt."
      BioCycle.  Unauthored, 63.

BioCycle,  1989 (February)   "Shredded Tire Applications: Recycled Rubber Roads."  BioCycle.
      Unauthored. 34.

Cooney and Davis, undated. "Whole Tire-Burning Facility Will Help Fight Dealer Problem."  Tire
      Review. By Tom Cooney and Jim Davis.

Dewan, M. 1992.  Personal Communication between Mr. Madhu Dewan, Bridgestone/Firestone, Off-
      Road Division, Akron, OH, and S. McCarter from Science Applications International
      Corporation (October 23/November 16, 1992).

Eidal, 1992.  Assorted marketing and cost information. Provided by Eidal Shredders: Eidal
      International Sales Corporation,  West Linn, OR.  Undated and 1992 information provided.

Getz and Teachy,  1992 (October).  "Options in Scrap Tire Management."  Waste Age.  By Norman
      Getz and Mary Fran  Teachy, 81.

Jones, M.  1992 (November 16).  Personal communication between M. Jones, Dee Gold  Mine, NV,
      and  S. McCarter, Science Applications International Corporation.

Martin,  1991.  "The Bumpy Road to Tire Recycling."  Garbage Magazine.  By Amy Martin,
      May/June 1991, 28.

Mattheis,  1988.  "How to Make 40 Million Tires Disappear." Waste Age.  By Ann H.  Mattheis,
      January 1988, 46.

Mecozzi,  1988. "Making Tracks: Wisconsin Gets Rolling on Tire Recycling." By Maureen Mecozzi,
      Wisconsin Department of Natural Resources.

Shamley,  R. 1992. Personal Communication between Mr. Roy Shamley, Michelin Tire Corporation,

STMC (Scrap Tire Management Council),  1993. Personal communication between Mr.  Michael
      Blumenthal, Executive Director  of the Scrap Tire Management Council, and J. Rissing, SAIC
      (February 2, 1993).

Greenville, SC, and P. Smith, Science Applications International Corporation, (October 23 and
      November 19, 1992).

EPA (Environmental Protection Agency), 1991  (September).  "Markets for Scrap Tires." U.S. EPA,
      Office of Solid Waste.  Document No. EPA/530-SW-90-074B.


Wald, Matthew L.,  1992.  Turning a Stew of Old  Tires Into Energy.  In:  The New York Times,
      December 27,  1992.
                                             76

-------
                          Innovative Methods of Managing Environmental Releases at Mine Sites

Zimmer.  1992 (October/November).  Personal communication between Mr. Jack Zimmer, the
     Goodyear Tire and Rubber Company. Akron, OH, to P. Smith, Science Application
     International Corporation (October 26/November 12, 1992).
                                            77

-------
                            Innovative Methods of Managing Environmental Releases at Mine Sites

                                         Attachment 1
                                  Activities at Dee Gold Mine


EPA contacted Dee Gold Mine to inquire about a tire return agreement with their tire supplier as
cited in a September/October 1992 issue of Mining World News.  Mr. Jones of Dee Gold explained
that Ravrock Yellowknife Resources, Inc., operator for  mine (as well as for Pinson and Marigold
mines), has  a contract with COBRE, a  tire supplier, who provides new tires and removes old tires  for
retreading or disposal.   The contract pertains only to large mine tires, and does not include smaller
tires used on their fleet of lighter vehicles.  Cobre's contract with mine covers the entire fleet of
loaders and  haul trucks.  (It is not clear if "fleet" pertains to equipment used at Pinson and  Marigold
Mines.) Through the "fleet deal" the cost of each large tire ranges from approximately $8,000 to
$10,000.  According to Mr. Jones, more mainstream prices could range from approximately $14,000
to $16,000 per tire.  (Barrick-Goldstrike also quoted tires in the $14,000 to $16,000 price range.)

Cobre  supplies the  mine site with a stockpile of new tires and a tire-changing truck with which to
replace old tires.  Mr. Jones did not  know how often the stockpile was replaced or the number of
tires used/removed per year. The fleet of vehicles includes 3 loaders, using 4 tires per vehicle, and 5
large haul trucks  using 6 tires  per vehicle.

Cobre  performs onsite evaluations of used tires and pays $500 for each tire that can be retread.  If
the tire is used to the extent that retreading is not an option, Cobre will still remove the tire for
disposal, but will not reimburse for them.  Dee Gold Mine does not purchase retreads from Cobre.
According to Mr. Jones, they have had better success with new tires which tend to last longer.
                                               78

-------
                            Innovative Methods of Managing Environmental Releases at Mine Sites

4.0 OTHER PRACTICES

4.1 WATER MANAGEMENT AT MINE SITES

Water management provides opportunities  for innovative methods of managing environmental releases
at  mine  sites. Current programs exist for the management of water at mine sites, and new ones are
presently being  developed.  Each program has its own regulatory definitions of terms such as "storm
water",  'discharge",  etc. Terms used in this  report are not based on  statutory definitions to allow for
a broader discussion  of the  topic.  This report focuses on a broad picture that overlaps many aspects
of the existing programs.


Non-process water discharge sources may be the result of any water flow, however diffuse, at the
site. Precipitation is the primary source, resulting  from rainfall and/or snow melt.  Intermittent
creeks and arroyos are apt to carry runoff.  Groundwater seeps may also form runoff at the surface.
In addition, some water sources may be created by the operator, such as irrigation, equipment
washing, dust suppression and cooling waters. Any area.that is disturbed by excavation, road
building or other activities is a potential source of contaminated runoff. One of the major concerns
regarding runoff from mining activities is the potential for acid generation and metals mobilization in
waste associated with mining.  In addition,  sediment (without toxic constituents) can cause significant
adverse impacts on stream quality and thus, is regarded as a pollutant when discharged.


Sources of potentially contaminated non-process waters at a mine site include, but are not limited to:

      Seepage from underground mine workings
      Runoff/seepage from abandoned/inactive mine workings
      Runoff from waste rock, overburden, and sub-ore piles
      Runoff from tailings piles
      Overflow from ponds or pits, especially during high precipitation or snow melt events
      Seepage from dump piles and tailings
      Runoff from chemical storage areas
      Runoff from co-located slag dumps
      Runoff from contaminated soil areas near co-located smelter operations
      Flue dust pile runoff
      Runoff from smelters, mills and other structures
      Former mining & processing areas with contaminated residue
      Vehicle access and haul roads, rail lines
      Truck and vehicle equipment maintenance wash
      Leaks from liquid/slurry transport lines
      Runoff from other areas disturbed by mining operations
                                              79

-------
                            Innovative Methods of Managing Environmental Releases at Mine Sites

Facility areas and activities not traditionally associated with mining activities:
      Infiltration and runoff from irrigation and grounds maintenance
      "Urban runoff"  from parking lots, roadways, contains salts, oils, mining residue
      Site construction projects,  will produce increase sediment load, greater erosion
      Landfills (municipal/solid  waste type or hazardous)
      Sewage/wastewater treatment facilities
      Vehicle  fueling  locations
      Petroleum tank storage areas
      Dust suppression activities
      Cooling water
      Boiler blowdowns
      Floor drains & wash downs

In controlling or preventing contaminated water discharges there are two principal factors:  (1) the
volume of water discharged and  (2) the  water quality, or concentration of pollutants in the water.
Discharges to surface  water caused by runon/runoff can be reduced by  addressing one or both of
these  factors.   Many of the control techniques available for management and control of runoff are
described in Appendix A.

Regulatory Background

The Clean Water Act  regulates discharges to waters of the United States. Discharges from mine sites
are addressed under two principal regulatory programs:  the NPDES permit program (for process
water and storm water point source discharges) and the Non Point Source program.

NPDES Point Source Program

A Point Source is defined in Section 502(14)  of the Clean Water Act as "any discernable, confined
and discrete conveyance, included but not limited to, any pipe, ditch, tunnel, conduit, well, discrete
fissure, container, rolling stock,  concentrated animal feeding operation, or vessel or other floating
craft from which pollutants are or may be discharged." The Water Quality Act amendments of 1987
added discharges from "landfill leachate collection systems"  to this definition. All point source
discharges  to waters of the U.S.  must be addressed by NPDES permits.

Per the Clean Water Act Sections 304(b),  304(c) and 306, EPA has promulgated effluent limitation
guidelines for discharges from mine sites mining metalliferous ores  (see 40 CFR Section 440).  These
guidelines include specific  technology-based numeric effluent limits  that must apply to point source
discharges  of process wastewater as well as most  storm water generated at mine sites.

Storm Water is defined in 40 CFR 122.26(b)(13) as "storm water runoff, snow melt runoff, and
surface runoff and drainage."  Storm water associated with industrial activity is defined in 40 CFR
Section 122.26(b)(14) as the discharge from any conveyance which is used  for collecting and
conveying  storm water and which is directly related to manufacturing,  processing, or raw materials
storage areas at an industrial plant.  Section 402(p) of the Clean Water Act generally requires EPA to
issue NPDES permits for point source discharges of storm water associated with industrial activity,
including active and inactive mines.  At mine sites, Section 402(1)(2) specifically limits the permit
                                               80

-------
                            Innovative Methods of Managing Environmental Releases at Mine Sites

requirements for storm water that has come into contact with any overburden, raw material,
intermediate products, finished products, byproducts, or waste products located on the site of the
operation.

EPA is currently developing a storm water program for those point source discharges from active and
inactive mines not already permitted.  Several states are also currently developing general storm water
permits  for mine sites and anticipate facility applications during the next year.  A few states have
issued draft  permits.

Won Point Source Program
Non-point sources of pollution are addressed  under sections 208 and 303(d) of the Clean Water Act of
1972.  Non-point source pollution is caused by  runoff from diffuse sources, and is generally caused
by rainfall or snow melt.  Non-point source discharges may be to streams, lakes, rivers, wetlands,  or
to groundwater. Major non-point source pollutants include sediments, oil and grease, metals, and
nutrients.

Section 319 of the Clean Water Act requires EPA and states to take a variety of actions to address
non-point source discharges. However, non-point source program development and implementation is
almost exclusively performed by states. EPA's  role is generally limited to providing guidance and
issuing grants to states to implement non-point  source management programs.

Specific best management practices (BMPs) requirements for non-point source control at mine sites
have not been promulgated at the national level nor has any national guidance manual been issued,
however, individual states are currently developing programs for storm water management at mine
sites. Idaho recently (November  1992) prepared a document entitled "Best Management Practices for
Mining in Idaho"  that describes practices to minimize non-point source water quality impacts.

General BMPs have been developed for other non-mining industries and sources of non-point
discharges such as urban and agricultural runoff.  Many state programs have focused on their
applicability to a specific watershed or body of water.

Case Studies
Four case studies were selected as examples of  how some facilities are approaching water
management at their operations.  The facilities selected include one new facility that has been
operating for less than a year and has incorporated water management into its reclamation plan; a
facility with an existing seepage problem that is using capping and wetlands treatment methods; a site
that diverted a stream channel; and one that has taken an integrated facility-wide approach.
                                               81

-------
                            Innovative Methods of Managing Environmental Releases at Mine Sites

Hayden Hill Project, LGMI/Amax Gold, Lookout California
Hayden Hill is a new mining operation; construction began in October 1991 and operations started  in
June 1992.  The Hayden Hills project is operated by Lassen Gold Mining, Inc.  (LGMI), a subsidiary
of Amax Gold Inc.  The site is approximately 55 miles northwest of Susanville, in Lassen County,
California.

Amax Gold won the 1992 DuPont/Conoco Environmental  Leadership Award for environmental
excellence in the precious metals industry  and a California Mining Association award for its facility
reclamation plan. (Mining Engineering, Dec. 1992).

Process operations include an open pit mine (gold and silver), waste rock disposal area, one heap
leach pad, mill  processing facilities, a gold and silver processing plant, solution containment ponds,
one tailings impoundment, and ancillary facilities.  The heap leach will be used for lower grade ore,
while higher grade ore will be milled  (carbon-in-pulp circuit).  Life of the mine (ore production) is
forecast as 8 years.  (EIS, 1991)

Activities at the site will disturb 6.55  acres of wetlands, 80 linear feet of permanent stream and 1,315
linear feet of intermittent stream. Hayden's obstacle was to design a mining facility that would least
impact the surrounding  area. Proposed actions  include creation of 18.5 acres of seasonally inundated
wetlands adjacent to the site. Activities will meet Clean Water Act Section 404 permit requirements.
Several of the storm water control measures incorporated into the Hayden Hill project design are
included in Table 8 or described below.
                                               82

-------
                            Innovative Methods of Managing Environmental Releases at Mine Sites

                            Table 6. Hayden Hill Control Measures
  Double liner and leak detection for heap leach pad
  Double liner and leak detection for the processing ponds
  Lined tailings impoundment
  Erosion control measures throughout construction and operation of the mine, i.e.,
        retention ponds to intercept runoff and promote settling,
        stream crossing constructed during low flow periods
  Stream crossing design had least change to stream bottom
  Protection of 500 feet of stream bank (near road crossing) to protect from grazing impacts
  Groundwater seeps (springs) near the open mine pit will be rerouted
  Diversion of natural drainage around the heap leach pad
  Solution pipes located in lined ditches
  Routine inspection of sediment control devices to ensure proper functioning (i.e. no blockage)
As part of the design studies, modeling of sediment yields was performed to evaluate cumulative
watershed impacts.  The study concluded that there would be no significant increases in sediment
impacts downstream of the project. (EIS, 1991, by reference FES, 1991) The design involves
extensive erosion control methods, both as interim measures during operations and as part of the
facility's permanent concurrent reclamation plan.  The facility has incorporated baseline and continual
monitoring of groundwater and surface water (pre-, during,  and post- mining activities) to ensure
BMP measures are working according to design standards.

Diversion ditches will surround the heap leach pad and the tailings facility.  The heap leach area has
process solution ponds, the perimeter ditch and the heap leach pad.  Reclamation activities will add
riprap chutes to channel runoff from  the heap leach area to a series of sedimentation ponds.  The
tailings facility is self-contained, with solutions and storm water remaining within the tailings
impoundment itself or a process water pond located nearby.  The tailings impoundment has a
freeboard berm surrounding  the area of deposition to protect against runon and overflow.

All runoff from the shop and warehouse areas are collected  in a storm water collection ditch.  The
design includes perimeter containment berms around the fuel loading and wash bays, to protect
against runon and to keep its storm water separate from other areas of the facility.  Above the mill
area are storm water diversion ditches to route storm water  around the mill to avoid potential contact
with material  at the mill.

A waste rock dump basin is  designed with interior benches that slope in a "V" towards the inside of
the basin to allow storm water to be  captured as it flows across the bench.  "V" ditches will drain the
runoff to a heap toe drain.  The waste rock dump drainage system incudes storm runoff chutes for
                                                83

-------
                            Innovative Methods of Managing Environmental Releases at Mine Sites

long vertical stretches.  An energy dissipation basin is located at the toe of the dump; it is a widened
channel constructed-with riprap that flows via natural  drainage channels to  a sedimentation basin.

As the concurrent reclamation activities begin, grading will be conducted to create suitable drainage
patterns to facilitate collection of storm water and break up of the overland flow.  Revegetation will
be an important step in  the concurrent reclamation and, to aid in that effort, various erosion controls
will be used including:  riprap in shallow interception ditches, sediment collection basins, rock dikes,
and straw bales as check dams around culverts.

Expectations are to return the site to livestock grazing, watershed protection, wildlife habitat, and
recreational use after completion of mining activities.   In its reclamation plan, LGMI focused on
designing seed mixtures tailored to specific areas and  specific post-mining land uses, realizing that
regrowth on disturbed land can differ from growth on the original undisturbed lands. As part of this
effort, LGMI studied  historic mining  disturbances in the area and their regrowth patterns.

Costs of implementing this program were not obtained. The Hayden Hill Project represents storm
water control measures, or BMPs, that are incorporated into  the initial design of the facility and into
its concurrent reclamation activities (concurrent with mining).  LGMI/Amax Gold won a recent award
from the California Mining Association for its reclamation plan that addressed these concerns.

Dunka Mine, LTV SMCo, Minnesota

Background
The Dunka mine site  is an example of a facility using wetlands treatment methods to mitigate an
existing seepage problem.  Although  the activities at Dunka are the result of enforcement actions
taken by the State, the measures that  are being used could be appropriate at other sites.  Because of
the potential applicability of  these measures,  a discussion of the Dunka site is highlighted below.

The Dunka site is an  iron ore mine operated  by LTV  Steel Mining Company (LTV SMCo).  Mining
activities at the site have generated vast stockpiles of waste rock, lean taconite ore stockpiles, and
surface material stockpiles.   A specific type of waste rock found at the site is the Duluth Complex,  an
acid generating gabbro, which is unique to the Dunka site.

The facility has experienced  seepage from the Duluth Complex waste rock stockpiles.  The seepage
has shown elevated levels of copper,  nickel,  calcium, magnesium, and sulfate.  Most of the seepage
from the waste rock piles has flowed to an unnamed creek that flows into Bob Bay  in Birch Lake.  A
 1977 study found elevated concentrations of  metals (copper,  nickel, cobalt, zinc) in Bob  Bay.  The
study estimated 500 million gallons a year discharge from the Dunka watershed to the creek.

The facility is currently working with the state on a strategy to mitigate leachate generation and
releases of trace metals specifically associated with the Duluth Complex materials.  Technologies
                                               84

-------
                            Innovative Methods of Managing Environmental Releases at Mine Sites

currently under study include pile capping, channeling to limit infiltration, active wetlands treatment
to remove metals, and neutralization of collected runoff to increase pH and precipitate metals.  These
measures are discussed further below.  The ultimate goal is a system of passive controls that will
require little or no maintenance.

Stockpile Capping

The facility is developing methods to cap the Duluth Complex stockpiles to reduce infiltration.
Surface materials at the site have been screened to three  sizes. Oversized material  (plus 3-inch) is
used to cover the side slopes of the stockpile.   A buffer layer of plus 1/2-inch to minus 3-inch
material is placed on  top of the stockpile followed by a primary barrier capping of 18 inches of minus
1/2-inch material. The cap is finished with a layer of the plus 1/2-inch to minus 3-inch material as a
growth media.  LTV  SMCo then seeds the top of the pile.

Channel Diversion
As part of the mitigation plan, the facility constructed a channel in the unnamed creek.  Originally,
the headwaters of the unnamed creek flowed directly through one of the Duluth material stockpiles
and into the pit.  Upstream of the stockpiles, the unnamed creek now has been diverted to the pit.
Additional ditches have been constructed to divert runoff from the Duluth material  stockpiles.  The
facility has also contoured slopes in the area to further reduce the runon to the Duluth Complex
materials. Total  rechanneling costs have been estimated to be $600,000.

Wetlands Treatment
Studies conducted at the site indicated effectiveness of wetlands treatment methods  for removal of
metals from runoff/seepage from the Duluth Complex stockpiles.  Water analyses indicated 30 percent
removal of nickel and 100 percent removal of copper by peat sequestration.  Overall mass analyses
indicated more than 80 percent of copper entering the wetlands were retained.

Neutralization/Metals Precipitation
The facility also operates a lime treatment system for removal of metals from collected waste rock
runoff/seepage. The system includes lined equalization basins to contain the seepage material until it
is pumped to a treatment plant where lime is added.  Flocculants are added and the material flows to
a thickener.  Overflow passes through a sand filter prior to discharge to the unnamed creek, while the
thickened sludge  is sent to a filter press.  As of August 1991, the facility  was evaluating markets for
the thickened sludge.

The Dunka mine site  is using wetlands treatment, neutralization, metals precipitation, capping, and
stream diversion  methods to mitigate existing seepage problems and to control future discharges.
Measures used at the  Dunka site can be appropriate as strategies at other mining facilities when
adapted to individual  site characteristics.
                                               85

-------
                            Innovative Methods of Managing Environmental Releases at Mine Sites

Bagdad Mine, Cyprus Bagdad Copper Corporation, Baghdad, Arizona
The Cyprus Bagdad facility is an example of an integrated approach to water management at an
existing facility.  Cyprus Bagdad's water management plan is included as part of its pollution
prevention plan.  The pollution prevention plan was prepared in response to Arizona  Department of
Environmental Quality (ADEQ) requirements.  The pollution prevention plan addresses many areas of
the facility including non-mining activities such as  vehicle fueling stations,  and provides
implementation strategies, such as  training and inspections.  The pollution prevention plan describes
an NPDES Best Management Practices Program.

A non-storm water discharge assessment was conducted by facility personnel in August  1992
identifying areas of potentially contaminated runoff at the utilities and facility support operations.
The assessment was conducted during a rainfall event in order to observe actual contaminated runoff
and areas of potentially contaminated runoff.  Observed releases included oil film in runoff entering a
storm drain from a vehicle storage area (leakage from a parked truck); oil film and food debris in
runoff from an unloading zone behind a facility grocery; and small amounts of sludge from a sludge
drying bed associated with the facility wastewater treatment plant.  Potential sources of contaminated
runoff included:  tank filling  areas; vehicle fueling; equipment storage area located  100 feet from a
creek (assorted scrap pipe, anodes, old tanks,  etc.); and open drums at chemical storage areas.

The committee addressed each of the identified sources  and potential sources of contaminated runoff
and suggested appropriate controls. Resolutions included modifying trash pickup schedules and
repairing hydraulic leak problems  in trucks and continual visual monitoring of the vehicle storage
area.  Facility operators notified the gas station lessee to use drip pans under leaking valves at the
diesel tank, to check once a day for leaks until a new tank  is installed, and required lessee to replace
and upgrade rubber used oil hoses. Other controls implemented at the Cyprus Bagdad facility are
listed below and in Table 9.

Cyprus uses diversion ditches to carry runoff away from the solvent exchange (SX) leach and tailings
disposal areas. The pollution prevention plan  calls for regular inspections and necessary repairs of
the ditches.  At other areas, runoff or spills are directed to collection  basins and surge ponds.  Cyprus
has plans for upgrading many of its existing ponds with double liners and leak detection systems.  A
sloped concrete pad was suggested as a simple, low-cost solution for containment of the kerosene
unloading pad in order to prevent  spillage from being discharged and to contain runoff.

Cyprus uses earthen berms around petroleum tanks to prevent runon from coming in contact with the
tank and surrounding area.  Additionally, if any spills or discharges from the tank occurs, the berms
would contain any contaminated runoff.

To reduce hydrocarbon and product residues from adhering to vehicles and to reduce potentially
contaminated runoff from being discharged, Cyprus plans for construction  of truck washes equipped
                                               86

-------
                             Innovative Methods of Managing Environmental Releases at Mine Sites

                           Table 7.  Cyprus Bagdad Control Strategies
 Construction of a lined impoundment and oil/water separator, at truck wash area
  Diversion ditches to carry potential storm runon away from SX leach and tailings disposal areas
  Maintenance of pumping systems for the prevention of accidental discharges from collection
  sv stems
  Visual leak/spill inspections of tailing disposal, reclaim water, seepage return, and leaching systems
  Redirection and control of water from mine shop parking lot
  Upgrade fuel islands & refueling practices (new containment structures for hoses, automatic shut-
  offs)
  Collection & recycling of spilled fuel and oil
  Berm area for mothballing old equipment
  Monitor equipment areas for oil contamination
  Develop procedures for decommissioning of equipment (washing, draining, etc.)
  Construct transformer receiving & handling area at the mine electrical shop storage area
  Cover copper-concentrate trucks with heavy tarps and bag molybdenum to prevent in transit losses
  Store molybdenum bags on pallets (polyethylene bags)
  Store copper concentrate on concrete and asphalt pads
  Recycle water at the tailings dam back to mill process
with lined impoundments and oil/water separators to collect wash-water and runoff.  Chlorinated
solvents will no longer be used at the truck wash, which eliminates a contaminant source.

The facility has designated and bermed an area for mothballing old equipment.  Berming protects
against oil and other residue from being discharged to surface water.  This area will be monitored for
contamination and procedures for decommissioning, washing, draining of equipment will be
developed to prevent further contamination.

Copper concentrate  trucks are covered with heavy tarps and molybdenum is bagged in polyethylene
bags to prevent in transit losses to road ways (losses can become contaminated runoff).  Molybdenum
bags are stored on pallets  and copper concentrate on concrete and asphalt pads in order to  reduce
contact with runoff.

Part of Cyprus's integrated approach is its wide variety of activities throughout its operations; another
aspect of its integrated approach is the level of detail.  The Cyprus pollution prevention plan clearly
states project descriptions, rationale, and performance goal summaries for each suggested control
measure.  Goals includes percent volume  reduction and target dates. The plan provides measures for
tracking progress via environmental  steering committee meetings,  tracking of construction projects
                                                 87

-------
                            Innovative Methods of Managing Environmental Releases at Mine Sites
through budgetary process, supervisors keeping monitoring logs, periodic management reviews.
tracking assigned projects via employee performance reviews, and training of employees.  Strategies
identified  include outlining the frequency of routine maintenance and inspections, and identifying what
items should be  inspected such as testing of emergency backup systems, monitoring pump rates, pond
and dam elevations, depth measurements  of liquid present in collection systems, visually inspecting
HOPE liners, checking pump performance  by motor amperage readings, piping and sumps to ensure
all systems are performing to design.

Valdez Creek Mine, Cambior Alaska, Inc, Cantwell, Alaska
The  Valdez Creek Mine is a placer gold mine operated by Cambior Alaska and Camindex Mines, and
is located  110 miles south of Fairbanks, near Cantwell, Alaska.  Mining in the Valdez Creek area has
occurred since 1903.  The current pit has been in service since  1984.

In 1990-1991, operational changes occurred at the mine site.  In order to access additional ore sources
beneath the active stream channel, Valdez Creek was diverted.  A diversion dam was constructed
upstream  of the  active pit. The dam impounds water, which then flows through the diversion channel
approximately one mile until rejoining with the stream.  The diversion channel is  lined with a
synthetic  liner and rip-rap to prevent erosion and incision (downcutting) of the channel.  The creek is
then returned to its original channel below the mine, before entering the Susitna River.

To assist  water management in the active area of the pit, the facility maintains two small diversion
ditches on either side of the valley above the mined area to intercept runoff before it reaches the pit.
Water from these diversion ditches flows to two settling ponds.  The facility's diversion system is
designed  to control flows produced by up to a 25 year storm event.  By utilizing the lined diversion
channel for Valdez Creek and the two small diversion ditches and settling ponds, the impact to the
downstream environment is minimized by  the reduction in turbidity and sedimentation in Valdez
Creek caused by the mining operation.

Like many placer mines in Alaska, Cambior  Alaska Inc, has used stream diversion techniques at the
site. However, at this facility the stream diversion not only prevents stream discharges, but also
 improves access to the ore and has lowered operating costs by reducing pit dewatering requirements.
 Specific operating costs  and construction costs were not obtained.

 Costs
 Costs were not  obtained for the specific  activities described in the above-mentioned case studies.
 Although cost data for the case studies are not available, there are some general costs that can be
 considered to be similar.  The following tables present costs associated with certain water
 management and control technologies.
                                                88

-------
                            Innovative Methods of Managing Environmental Releases at Mine Sites
Cost estimates for construction activities that may apply to mining can be consulted, in order to
provide a relative cost comparison.  Two major costs associated with discharge control activities
include the costs of drainage management systems (see Table 10),  and the cost of sediment and
erosion controls (see Table 11).  The cost estimates were developed by EPA's storm water program
Baseline General Permit.  It should be noted that the costs  have not been adjusted to reflect the
accessibility issues that frequently arise at mine sites.

                       Table 8.  Costs of Drainage Management Systems
                                     for Construction Sites
                  Source:   EPA Storm Water Program  Baseline General Permit
Drainage Management System
Wet ponds
Dry ponds
Dry ponds with extended detention
Infiltration trenches
Cost for 5 acre developed area
$5,770
$12,000
$5,950
$8,500
Cost for 20 acre developed
area
$16,300
$29,330
$15,500
$34,100
                                               89

-------
                         Innovative Methods of Managing Environmental Releases at Mine Sites




                       Table 9.  Sediment and Erosion Control Costs
Temporary Seeding
Permanent Seeding
Mulching
Six) stabilization
Vegetative buffer strip
Earth dikes
Straw bale dikes
Silt fences
Drainage swales - grass
Drainage swales - sod
Drainage swales - riprap
Drainage swales - asphalt
Drainage swaJes - concrete
Check dams - rock
Check dams - covered straw bales
Level spreader - earthen
Level spreader - concrete
Subsurface dram
Pipe slope drain
Temporary storm drain diversion
Storm drain inlet protection
Rock outlet protection
Sediment traps
Temporary sediment basins
Sump pit
Entrance stabilization
Temporary waterway crossing
55 .(JOG per acre
$5, (XX) per acre
56,000 per acre
54 00 per yard
$5,000 per acre
$5 50 per linear foot
$5.00 per linear foot
$6.00 per linear foot
$3.00 per yard
$4.00 per yard
$45.00 per yard
$35.00 per yard
$65.00 per yard
$100 per dam
$50.00 per dam
$4.00 per yard
$65.00 per yard
$2.25 per linear foot
$5.00 per linear foot
Variable
$300 per inlet
$45.00 per yard
$500 to $7,000 per trap
$5,000 to $50,000 per basin
$500 to $7,000
$1,500 to $5,000 per entrance
$500 to $1,500
Source:  EPA Storm Water Program Baseline General Permit
                                           90

-------
                           Innovative Methods of Managing Environmental Releases at Mine Sites

Conclusions

It is possible to minimize releases of wastes by managing runon/mnoff in a manner that avoids or
minimizes generation of potentially contaminated water. In cases where  contact of water with
contaminant sources has occurred, or cannot be feasibly or cost effectively prevented, measures can
be employed to collect, contain, and treat the runoff.  These activities can be accomplished by
developing, implementing, and maintaining an integrated approach to water management at a mining
facility.


This report has briefly outlined a few case studies where many practices  have been implemented.
Actual facility implementation of the reclamation and water management plans, however, was not
investigated for this study.  Activities like those discussed in the case studies, as well as many other
techniques, can be incorporated into existing facilities throughout the mining  industry.  Initial facility
design considering runon/runoff controls is a good example of planning.   In addition, one important
aspect to success is the daily, routine implementation of the correct management practices.
Contacts:  EPA Nonpoint Source Coordinators

Region 1
      Bob Moorehouse
      Jack F. Kennedy Federal Building
      Boston, Massachusetts 02203
      (617) 565 - 3545

Region 2
      Mack Henning
      26 Federal Plaza, Room 813
      New York, New York  10278
      (212) 264 - 2055

Region 3
      Hank Zygmunt
      Chestnut Building
      841 Chestnut Street
      Philadelphia, Pennsylvania  19107
      (215) 597 - 8429

Chesapeake Bay Program, Region 3
      Lynn Shuyler
      410 Severn Ave, Suite  109
      Annapolis, Maryland 21403
      (410) 267 - 0061
Region 6
      Brad Lamb
      1445 Ross Ave
      Dallas, Texas 75202
      (214) 655 - 6683

Region 7
      Julie Elfving
      726 Minnesota Ave
      Kansas City, Kansas 66101
      (913) 551 - 7475

Region 8
      Carol Russell
      One Denver Place
      999 18th Street
      Denver, Colorado
      (303) 293 - 1449

Region 9
      Jovita E. Pajarillo
      75 Hawthorne Street
      San Francisco, California 94105
      (415) 744 - 2011
                                              91

-------
                           Innovative Methods of Managing Environmental Releases at Mine Sites

Region 4                                                Region 10
      Mary Ann Gerber                                         Robert Moore
      345 Courtland Street, NE                                  1200 6th Ave
      Atlanta. Georgia 30365                                    Seattle, Washington 98101
      (404)347-2126                                          (206)553-4181

Region 5                                                Idaho Operations Office. Region 10
      Tom Davenport                                           Don Martin
      77 West Jackson Street                                    422 West Washington Street
      Chicago. Illinois 60604                                    Boise, Idaho 83702
      (312) 886 - 0209

References

American Mines Handbook 1991-1992.

Best Management Practices for Mining in Idaho, Idaho Department of Lands in Conjunction with
      Other State and Federal Agencies through the Idaho Mining Advisory Committee, November
      16, 1992.

Cambior Alaska, Inc Response to EPA's September 1992 Draft Mine Site Visit Report, November
      13, 1992.

Checklist for NEPA Reviewers - Non-Coal Mine Sites, Draft Final, prepared by Science Applications
      International Corporation for U.S. Environmental Protection Agency, April 25, 1991.

Coastal  Nonpoint Program, Program Development and Approval Guidance, Appendix B, Overview of
      Existing National Efforts To Control Nonpoint Pollution, pages 37 - 40.

Controlling Urban Runoff: A Practical Manual for Planning and Designing Urban BMPs, Tom R.
      Schueler, Metropolitan Washington Council of Governments,  Department of Environmental
      Programs, July 1987.

Cyprus  Bagdad Copper Corporation, Pollution Prevention Plan, Submitted to the  Arizona Department
      of Environmental Quality,  Pollution Prevention Unit, December 1992.

Environmental Impact Report/Environmental Impact Statement for the Hayden Hill Project, Lassen
      County,  California, Final,  prepared by Steffen Robertson and Kirsten, Inc., for Lassen Gold
      Mining,  Inc., Two Volumes, State Clearing House No.  89020079, September  1991.

Environmental Management for the 1990s. Introduction to  Evaluation, Design and Operation of
      Precious Metal Heap Leaching Projects.  Editors Dirk J.A. van Zyl, Ian P.O.  Hutchinson, Jean
      E. Kiel, published by  Society of Mining Engineers, Inc. Littleton, Colorado, 1988.

EPA Journal, "The Problem: Introducing NPS Water Pollution, We Can't Write Permits on Parking
      Lots", Robert Griffin, Jr., pages 6 - 9, November/December  1991.

Idaho Nonpoint Source Management Program, Idaho Department of Health and Welfare,  Division of
      Environmental Quality, Water Quality Bureau, prepared by Stephen B. Bauer, 1989.

Managing Nonpoint Source Pollution,  Final Report to Congress on Section 319 of the Clean Water
      Act (1989), U.S. Environmental Protection Agency, Office of Water, Doc  No EPA-506/9-90,
      January  1992.
                                             92

-------
                           Innovative Methods of Managing Environmental Releases at Mine Sites

Mining Site Visit: LTV Steel Mining Company, U.S. Environmental Protection Agency. June  1992.

Mine Site Visit: Valdez Creek Mine, Cambior Alaska Incorporated, Draft, prepared by Science
     Applications International Corporation, for U.S. Environmental Protection Agency, September
      1992.

Mining Engineering, Industry Newswatch "Amax Gold Wins DuPont/Conoco Environmental Award"
     page"40, December. 1992.

Mining Engineering, "Gold Mining  From the Perspective of a Chief Executive Officer", page 987,
     August,  1992.

Mining Engineering, U.S. and International Mineral News Briefs, January, 1992, page 40.

Noncoal Reclamation,  Audit Report, Abandoned Mine Land Program, Office of Surface Mining
     Reclamation and Enforcement, U.S. Department of the Interior, Office of Inspector General,
     Report No. 91-1-1248, September,  1991.

Nonpoint Source Control Program,  Chapter 10, pages 161 - 166, document title not specified.

Northern Miner, "Amax Gets Permit for Hayden Hill After Two Year Wait," John Kilburn, page 1,
      ISSN 0029-3164, November 25,  1991.

Report To Congress, Wastes From the Extraction and Beneficiation of Metallic Ores, Phosphate
      Rock, Asbestos, Overburden from Uranium Mining, and Oil  Shale, U.S.  Environmental
      Protection Agency, Office of Solid Waste, December 31, 1985.

Skillings Mining Review,  "Amax Gold and U.S. Gold To Go Ahead with Hayden Hill," ISSN 0037-
      6329, page 13, October 21, 1989.

SME Mineral Processing Handbook, N.L. Weiss, Volume 2, published by Society of Mining
      Engineers, 1985.

State Regulation of Mining Wastes: Current State of the Art, Draft, Environmental Law Institute,
      April, 1992.

Storm Water Management for Construction Activities, Developing Pollution Prevention Plans and
      Best Management Practices, U.S. Environmental Protection Agency, Office of Water, EPA
      832-R-92-005, September 1992.

Storm Water Management for Construction Activities, Developing Pollution Prevention Plans and
      Best Management Practices, Summary Guidance, U.S. Environmental Protection Agency,
      Office of Water, EPA 833-R-92-001, October, 1992.

Storm Water Management for Industrial Activities, Developing Pollution Prevention Plans and Best
      Management Practices, U.S.  Environmental Protection Agency, Office of Water,  EPA 832-R-
      92-006, September  1992.

Tailings Management: Problems and Solutions in the Mining Industry, G.M. Ritchy,  Process
      Metallurgy 6, published by Elsevier, 1989.
                                             93

-------
                            Innovative Methods of Managing Environmental Releases at Mine Sites

                                          Attachment

                      Techniques for Management and Control of Runoff

Management and Control of Runoff


Effective practices for the management and control of runon/runoff are also known as best
management practices, or BMPs.  BMPs can be defined as measures or practices used to reduce the
amount of pollution entering surface water, air, land, or groundwater, and may take the form of a
process, activity, or physical  structure.  BMPs may include schedules of activities, prohibitions of
practices, maintenance procedures, and other management practices to prevent or reduce discharges of
pollutants to waters of the United States.   BMPs include treatment requirements, operating
procedures, and practices to control plant site runoff, spillage or leaks, waste disposal, drainage from
raw material storage or other disturbed areas.


There are two ways to reduce the potentially contaminated discharges from a facility.  First is
avoidance;  it is often preferable to minimize contact of water with contaminant sources. Second is to
reduce the  volumes of wastewater and pollutant concentrations in the wastewater.  BMPs applicable to
mine site discharges can  be divided into three general areas:  (1) construction/reclamation, (2)
management and housekeeping, and (3) treatment.   Specific techniques in each of these areas include:


Construction/Reclamation Techniques
    diversion ditches and drainage systems
    rip-rap
    dikes & berms
    grading or terracing
    collection basins
    capping or sealing
    vegetation & mulching
    silt fences

Management & Housekeeping Techniques
    proper handling procedures
    immediate spill cleanup
    inspection
    training & education
    routine maintenance
    comprehensive pollution prevention plan
    periodic reviews of systems

Treatment  Techniques
    sedimentation basins
    oil/water separators
    neutralization
    artificial wetlands

 In a hierarchy of preferred strategies, it is generally most desirable to avoid contact with exposed
 materials.  This is done  by preventing runon from  flowing onto the site or coming into contact with
                                                94

-------
                            Innovative Methods of Managing Environmental Releases at Mine Sites

individual contamination sources (using practices such as dikes or berms).  Second if contamination
does occur,  BMPs can be used to promote infiltration and reduce contaminant loadings.  Finally,
runoff can be collected in basins for sedimentation or treated by other means.  A brief discussion of
[he various construction/reclamation techniques and treatment systems follows.

Construction/Reclamation Techniques

Construction/reclamation techniques are divided into structural,  vegetative, and capping/sealing
practices in  the following subsections.

Structural Practices

Discharge diversions provide the first line of defense in preventing the contamination of discharges
and are installed to divert flow, store flow, or limit runoff.  Diversion structures are often designed to
prevent water from crossing disturbed areas where contact may  occur between run-on and significant
materials. These measures may be particularly effective for former mining areas and stockpiles.
Measures to prevent contact include diversion structures, such as dikes, berms, or ditches to channel
runon  away  from or around a potential contaminant source.   Materials used to construct dikes, curbs,
and berms include earthen materials (eg. clay), concrete, synthetics, metal or other low permeability
substances.  Additionally, diversion structures can be used to collect or divert waters for later
treatment, if necessary. The usefulness of diversion measures are limited by such factors as the size
of the  area to be controlled, and volumes  of runoff to be diverted.

Drainage Systems

Drainage systems are designed to control  drainage by redirecting channel flow, slowing velocity and
controlling volume, in order to improve or prevent infiltration or reduce erosion.  A drainage system
may consist of structures such as subsurface drains, leachate  collection systems, etc.  Drainage
systems may be lined with grass, rip-rap, asphalt, or concrete.

Drainage systems are effective  when used in conjunction with outlet velocity dissipation devices
designed to  slow the flow of water discharged from a site in order to lessen the amount of erosion.
Some examples of the more effective velocity dissipation devices include check dams, rock outlet
protection, and level spreaders.  These are discussed below.

Check Dams.  Check dams are small temporary dams constructed across swales or drainage ditches to
reduce the velocity of runoff flows, thereby reducing erosion and potential failure of the swale or
ditch.  This  slowing also allows sediments to settle. Materials used to construct check dams include:
rock, timber, sandbags filled with pea gravel, and straw bales.

Check dams also may be used as a passive treatment mechanisms, particularly for acid mine drainage.
By incorporating alkaline containing materials (i.e., limestone rock or mix materials with neutralizing
                                               95

-------
                             Innovative Methods of Managing Environmental Releases at Mine Sites

properties with pea gravel  in the sand bags), acid mine drainage can be treated.  Additionally,
incorporating a sorbent into the sand bags  will assist in absorbing organics.

Rock Outlet Protection.  Rock protection at the outlet of culverts, channels,  or ditches reduces  the
depth, velocity,  and destructive energy of  water. As with check dams, rock outlet protection may
also be used as a passive treatment mechanism by using rocks containing limestone or other alkaline
materials to neutralize acidic discharges.

Level Spreaders.  Level spreaders are outlets for dikes and diversions consisting of an excavated
depression constructed at zero grade across a slope.  Level spreaders convert concentrated high
velocity, concentrated flows  into diffuse runoff that is released onto areas stabilized by existing
vegetation (thereby promoting infiltration).

Infiltration Controls

Infiltration controls are surface or subsurface measures such as trenches and basins, that promote
rapid infiltration of precipitation and runoff.  Infiltration devices can be used to reduce discharge
volumes and provide for groundwater recharge. Treatment may be incorporated within the
trench/basin.  Limestone or soda ash can be used for neutralization of potentially acidic discharges.

Straw bale dikes, silt fences,  and brush barriers are temporary barriers used to intercept sediment in
runoff from small areas of disturbed soil.  Silt fences consist of geotextile fabric (filter cloth).  Silt
fences are generally more  effective in preventing discharges of sediment than straw bales.  Brush
barriers are temporary sediment barriers composed of tree limbs, weeds, vines, root mat, soil, rock,
and other cleared materials placed at the toe of a slope. A brush barrier is effective only for small
drainage areas,  usually less than 1/4 acre, where there is sheet flow, and the slope is minimal.

Vegetative Practices

Vegetative practices involve covering or maintaining an existing cover over soils.  The cover may
consist of grass, trees, vines, shrubs, bark, mulch  and/or  straw.  A vegetative cover reduces the
potential for erosion at a site by reducing  flow through infiltration. Vegetative practices include
permanent seeding, mulching, soil conditioning, contouring or grading, and the use of vegetative
strips.

Permanent seeding stabilizes the soil to reduce sediment in runoff from the site.  Mulching is most
effective when used in conjunction with a permanent seeding program.  When permanent seeding is
not feasible, exposed soils can be stabilized by applying plant residues or other suitable materials  to
the soil surface. Soil conditioning or topsoiling may be necessary to improve the area on which
permanent vegetative practices will be established.  Conditioning is often necessary where soil is of
poor quality. Surface contouring creates horizontal grooves, depressions, or steps that run with the
                                                96

-------
                            Innovative Methods of Managing Environmental Releases at Mine Sites

contour of the land.  Slopes may also be left in a roughened condition to reduce discharge flow and
promote infiltration.

In some cases,  revegetation of an entire sue is unfeasible.  In such cases, revegetation in buffer strips
may he a more appropriate control  measure.  Vegetative buffer strips are strips of vegetation at the
top and bottom of the slope of a disturbed site.  Vegetative buffer strips can slow runoff flows at
critical areas, decreasing erosion and promoting sedimentation.

Capping and Sealing

Elimination of a pollution source through capping, plugging, or sealing contaminant sources may be
the most cost effective control measure for discharges from former and inactive mining  operations,
including tunnels, adits,  and surface mine  workings as well as from waste rock and tailings.

Capping/sealing is designed to prevent infiltration, as well as to limit contact between runoff and
potential sources of contamination.  Ultimately, capping should reduce or eliminate the  contaminants
in discharges.  In addition, by reducing infiltration, the potential for seepage and  leachate generation
may also be lessened.  This practice could be applicable to pits, waste  rock piles and tailings piles
(particularly acid producing materials). Cap/liner materials include soil, clay, and/or synthetics.

Plugging of mine adits provides control and reduction of waste generation and migration. Once the
adits are plugged, water will rise and flood the void space behind the plugs.  Inundation of high
sulfide mineral zones behind the plugs will prevent or reduce the chemical reactions that generate acid
and release metals from the minerals, thereby reducing the contamination of water within the
mineralized zones. Plugs will serve to prevent surges of water, sludge, and sediment from tunnels to
surface waters, as well  as preventing the introduction of precipitation into subsurface areas.

Leachate Control and Collection

Leachate control and collection  techniques may be appropriate for managing leachate/seepage from
mine adits,  mine waste units, and heap and dump leach piles.  Leachate collection and removal
systems are commonly  sand drainage layers, synthetic drainage nets (i.e., geonets) or granular
drainage layers with perforated  collection pipes installed in gravel-filled trenches above the liner at the
base of the  disposal unit. The collection system is drained by gravity to a sump or series of sumps or
to storage tanks or ponds from  which the leachate  is withdrawn for treatment or disposal.

Treatment Techniques

Treatment practices are those controls that result in a reduction of pollutant  concentrations in
discharges. Most treatment systems are based on relatively simple passive technologies such as
settling of solids, and neutralization, and are  designed to collect and temporarily store on-site runoff
to meet the demands  of a 10-year,  24-hour storm,  or 25-year, 24-hour storm event.
                                                97

-------
                            Innovative Methods of Managing Environmental Releases at Mine Sites

Discharge Detention Structures (Sediment ponds)

Discharge detention structures can achieve  a high removal rate of sediment and metals.  Additionally.
ponds have the capacity to promote degradation of organic contaminants.  Detention ponds may  also
act as surge ponds to reduce or eliminate discharges during major storm events or high  snow melt
periods.

Organic Treatment

Biological processes are typically used to remove organic contaminants.  These processes can include
anaerobic filters, anaerobic sludge bed reactors, aerated lagoons, rotating biological conductors and
trickling filters.  Organic removal can also be effectively accomplished by other physical/chemical
treatment methods, including air and steam stripping, carbon absorption, and oxidation  with calcium
hypochlorite or ozone.

Chemical Treatment for Metals

Physical/chemical treatment can also be accomplished in the detention structures described above.
This most common type of chemical/physical treatment involves the addition of lime or other caustics
to provide neutralization and/or precipitation of metals.  Typically, pH levels of 9 to 12 standard units
are required to achieve desired precipitation rates.  Acid addition may be necessary to reduce the pH
if discharge to surface waters is necessary.  Polymer addition can also be used to enhance settling.

Lime and calcium fluorophosphate admixing provide an alkaline environment that helps to prevent
bacterial oxidation of pyrites in waste materials while neutralizing the pyritic material that is oxidized.
Admixing is most effective when used in infiltration trenches filled with different gradients of
limestone or soda ash.

Oil/Water Separation

Oil and water separation can be accomplished by use of an API or similar type of treatment device
which acts to skim oil and settle sludge. Passive oil/water separators constructed of concrete can also
be used to separate oil and water by gravity separation.  Absorbent booms are also sometimes used to
collect any oil contained in runoff.

Artificial Wetlands

 Artificial wetlands are designed to maintain a permanent pool of water.  Artificial wetlands will be
 most cost-effective when used to control runoff from larger, heavily developed sites. Artificial
 wetlands are created to provide treatment.   Artificial wetlands  are currently being researched by the
 Bureau of Mines as a means of mitigating  acid mine drainage.
                                                98

-------
                            Innovative Methods of Managing Environmental Releases at Mine Sites

4.2 CYPRUS BAGDAD POLLUTION  PREVENTION PLAN
Arizona has established a multifaceted pollution prevention program to encourage generators of
hazardous waste to prepare a  Pollution Prevention Plan.  The Company issued a Plan in December
1992 that integrates pollution  prevention planning for the entire facility with existing emergency
response plans, such as their Spill Prevention Control and Countermeasures (SPCC) Plan  and others.

The State encourages companies to prepare pollution prevention plans by reducing environmental
permit filing fees 50 percent.  Cyprus estimates that this amounts to a saving of $10,000 to $20,000
per year.  As stated in the Plan, Cyprus is committed to identifying,  measuring, and reducing
pollution from its facilities. While acknowledging the need to use chemicals  in many phases of their
operation, they have obligated themselves to reduce  the amount of hazardous substances used and
hazardous wastes generated.

According  to a facility representative, Cyprus management initiated preparation of the Pollution
Prevention Plan in response to the State requirement.  The Company Vice President on site issued a
statement promoting the importance of pollution prevention and requesting full employee  support.
Cyprus Bagdad's Plan was designed as a workforce  based plan with the environmental department
acting more as a facilitator in the process. The Plan was implemented through top-down  and bottom-
up training. Management was trained in pollution prevention concepts and an environmental steering
committee  was formed.  The  environmental steering committee coordinated employee training in
pollution prevention and enlisted their help at their regular safety meetings in implementing the Plan.
Both management and employees worked to  identify projects. The facility's environmental staff
conducted an internal audit for regulatory compliance and made recommendations to management.
Their current function is  to help management setup a tracking system for new ideas submitted by the
employees  and to monitor the status of ongoing projects.  According to Cyprus, they are  receiving
one or more ideas each week. A status report was submitted to the State in July, 1993.

Plan  Components
The Cyprus Pollution Prevention Plan was structured as a composite of existing plans and new
material combined into three  new plans.  The three plans, prepared by the Mine, Mill (with the SX-
EW plant as a sub-area),  and Community Services operations, were designed to encourage
departmental initiatives, identifying projects  within their area that support the Company's goal of
pollution prevention.  Projects identified for the Community Services Operation are not included in
this report since they are not  related to mining activity.  For existing plans (e.g. SPCC plan) best
management practices and waste minimization  goals were also identified.  The general goals of the
Pollution Prevention Plan, as stated by Cyprus are:  (1) inventory all chemical and petroleum
products at each location; (2) identify and develop substitute product recommendations; (3) develop
methods for mass balance on chemical and petroleum products, and; (4) develop employee training
and heighten awareness.  New contract language with contractors, vendors, or service companies
requires compliance with Cyprus Bagdad's Pollution Prevention Plan.
                                               99

-------
                            Innovative Methods of Managing Environmental Releases at \fine Sites

In this summary, projects identified in each operation's plan are grouped into one of two categories;
those unique to mining and those best described as good housekeeping.  The following text
summarizes these projects grouped by these two categories.  Within these categories,  the project's
orientation is identified (e g.  source reduction, spill prevention, etc.). Descriptions of the projects
include information as it  is available from the Plan in the individual operation's description.  Where
applicable, planned completion dates and regulatory  requirements are given.

Projects Unique to Mining
Of the projects identified as part of the Plan,  none are uniquely related to the operation of the mine.
However, one project planned for the mill  and three projects planned for the Solvent  Extractton-
Electrowinning (SX-EW) plant can be considered unique to extraction and beneficiation operations.

Mill personnel have observed that the zinc  liners in the secondary crushers could be recycled more
effectively.  While zinc mantle liner pieces are currently recycled at the facility (the method of
recycling was  not discussed), they sometimes get misplaced in the scrap metal bin used for steel.
According to Cyprus, more careful  segregation could reduce 1993 zinc purchases as much  as 20
percent of those in  1992 (up to 1,900 pounds at $0.87 per pound).

Two of the projects are identified for the SX-EW facility involve upgrading solution impoundments
and adding leak detection systems.  The pregnant leach solution (PLS) surge pond is to be  upgraded
to double-lined containment with a leak detection system. The raffmate pond will be  upgraded by
adding a leak  detection system.  Work on the PLS surge pond and the raffinate pond  are required for
compliance with Arizona Department of Environmental Quality (ADEQ) aquifer protection limits.  A
third project is to recover kerosene exiting the solvent extraction  stream (the method was not
specified).  Personnel are investigating installation of a recovery system for entrained organics in the
raffinate stream.

Good Housekeeping Projects
Most of the projects proposed by the plan are good housekeeping measures. The predominant source
reduction techniques employed are product changes and source control.  Recycling and waste
treatment are  also employed  in addition to  source reduction.  Of the 25 good housekeeping measures,
the mine identified seven, the mill identified  eleven, and the SX-EW plant identified seven. All of the
practices could potentially be applied at other mine sites.

Mine
Of the seven projects identified by the mine,  some are currently underway. Fuel spillage will be
controlled (source control) around the fuel islands and new re-fueling procedures are  to implemented.
This project calls for design and installation of a containment structure for hoses and  an evaluation of
automatic shut-offs. Spilled fuel and oil will be collected and recycled whenever possible.  Cyprus
also plans to site, design, and construct a bioremediation facility  for petroleum contaminated soil.
                                               100

-------
                            Innovative Methods of Managing Environmental Releases at Mine Sites

According to the Plan, soil will be returned to the waste dump  or used as landfill cover when
hydrocarbon contamination drops below the current regulated level  of 100 ppm.

The mine is investigating using bulk containers instead of 55 gallon drums for  lubricants to eliminate
residual product in the drums.  Lubricant suppliers will be contacted to determine if bulk reusable
containers are available and written procedures will be developed for their use.  Other projects call
for elimination of chlorinated solvents in the truck wash facility.  The mine shop will reduce use of
chlorinated solvents 25  percent.  As part of this activity, the sedimentation basin will be closed and
remediated and a lined impoundment with an in-line oil/water separator will be built.  Storm drains
from the mine shop parking lot will be controlled and diverted to the impoundment.  Water will be
redirected to  the mine (additional details on this project were not provided in the Plan).

Another project to be implemented will be selecting a storage site and developing written procedures
for decommissioning  used equipment (e.g. washing, draining fluids, etc.).   The storage area is to
bermed and monitored for oil contamination.  Finally, a transformer receiving  and handling area at
the mine electrical shop storage area will be built.

Mill
Mill projects focus on recycling and source reduction.  Like the mine, some of these are intended to
meet ADEQ  regulatory requirements.  The Company is asking lubricant suppliers to recycle spent
products. As part of this project, the purge and collection system for oil and grease will be revised to
use bins. The current system was not described.  Freon from refrigeration units will be recycled  to
minimize evaporation of chlorinated compounds.  Cleaning solvents in the maintenance area will also
be recovered and recycled.  Safety Solvent will be filtered and recycled; this should reduce purchases
by 20 percent.

The maintenance shop will recover and recycle metal scrap. Bins for metal were placed in the shop
area. Cyprus estimates that 10,000 Ibs of scrap bolts etc. should be collected annually.  Scrap metal
is recycled off-site.

Truck washes will collect hydrocarbons and sediment.  Hydrocarbons will be recycled wheriever
possible or sent to the bioremediation facility.  The warehouse is also investigating options to sell
paper and cardboard  to a recycling plant and plans to reuse packing materials where possible.

Examination of source  reduction opportunities have resulted in a number of projects.  The mill uses
lime to condition water reclaimed from the tailings impoundment.  By adjusting the pH of feed water
from 10.5 to  10.0, lime consumption will be reduced 5 percent.  This will  result in a minor cost
savings and should not pose a scaling problem. In the past, the mill has added chlorine to tailing
seepage water to prevent excessive biogrowth; 800 pounds  of calcium hypochlorite was added in
 1992).  Cyprus will discontinue this practice since no benefit was observed. Another goal for source
reduction is the elimination of chlorinated solvents.  Some chlorinated solvents have already been
                                               101

-------
                            Innovative Methods of Managing Environmental Releases at Mine Sites

eliminated from stock (e g. tnchloroethane was eliminated), and others were reduced 50 to 70 percent
(usage was not specified).  Storage and use of toluene-based spray paint will also be discontinued.
Hand painting with non-toluene based paint will be encouraged.

The  mill's laboratory inventoried their chemicals on hand. A selected stock of chemicals have been,
or will be, reduced or eliminated.  Following a January 1992  inventory,  a licensed chemical disposal
firm removed 122 chemical species from the laboratory.  Additional chemicals are to be removed.
The  laboratory also eliminated use of xylenes to dilute analysis oils and substituted kerosene.

SX-EW Plant
Projects at the SX-EW plant are intended to control surface contamination and encourage source
reduction.  Several of the projects at the facility are designed  to meet ADEQ requirements.  The
Flood Basin will be upgraded by installing double-lined containment with a leak detection system.
The  facility also plans to build a containment structure around the kerosene unloading pad to contain
any  spills which occur during unloading.  The acid storage area will be relocated and upgraded so
that  drainage would enter the leach feed solution.  Details on  the design  were not specified.  Spills
outside the Electrowinning (EW) facilities, and from the sulfuric acid storage tanks, will report to the
raffmate pond in the future.

A variety of source reduction projects are underway. To eliminate-empty waste drums and the need
for disposal on  site, Cyprus  is investigating the use of recyclable containers for bulk chemical
delivery.  The laboratory is revising their analytical techniques to reduce reagent consumption.  For
example, potassium iodide consumption could be reduced 60  percent each year by  optimizing the
short iodide method for copper analysis.  Atomic  absorption and chloride colorimetric methods for
copper analysis will be investigated as replacements for the short iodide  method.

Costs and Benefits
According to a facility representative, the current costs associated with implementing the Plan exceed
savings.  Cyprus expects that the  benefits of the program to equal the costs hi the long term. The
search for substitutes to replace chlorinated solvents and the costs for disposal of these existing
solvents has its associated costs.  When the chlorinated solvents are replaced, these costs are expected
to be reduced substantially.  Environmental benefits are realized by containing process solutions in
 lined impoundments and bioremediation onsite. The potential to reduce costs by recycling zinc liners,
scrap metal, and other material  and the reduction or elimination of chemicals such as lime, calcium
hypochlorite, and chlorinated solvents are also incentives. Current savings are in the form of
 incentives from the State for having prepared the Plan.  The Company estimates they are saving
 between $10,000 and $20,000 in  State hazardous  waste disposal fees as  a result of a 50 percent  .
 discount on these fees (the type and volume of wastes transported off site were not specified).
                                                102

-------
                            Innovative Methods of Managing Environmental Releases at Mine Sites

Summary and Conclusions
The Cyprus Bagdad Copper Company prepared an integrated Pollution Prevention Plan.  This was
accomplished and continues to evolve with the support of Company management and individual
employees. Based on implementation of all the Plan's activities, information on the inventory and
mass balance  of all chemical and petroleum products would provide a solid basis to organize and
focus future projects.  A portion of the Plan consists of other plans (e.g. Spill Prevention Control and
Countermeasures) required  at mine sites as part of State regulations.  These Plans are integrated into
the Pollution  Prevention Plan and themselves contain Best Management Practices.

The approach used by Cyprus of evaluating all operations is sound. Cyprus is not only reducing its
environmental liability, but may also reduce its operating costs.

Phone Contacts
Cyprus Bagdad Copper Corporation
    Colleen D.  Kelly (602) 633-2241, Extension 204.   '
                                              103

-------
                           Innovative Methods of Managing Environmental Releases at Mine Sites

Comments

The U S. Bureau of Mines and the Cyprus Minerals Company submitted comments to EPA on an
earlier draft of this document.

EPA Response to Comments

The U.S. Bureau of Mines submitted comments.  These have been responded to as appropriate.

EPA Response to Cyprus Comments

Comment  1:  The introduction implies that there is uncertainty as to whether or not pollution
prevention/waste minimization is currently practiced  in the mining industry.

Response:  EPA believes that the introduction clearly states that the mining industry is currently
practicing forms of pollution prevention/waste minimization. The purpose of these reports is to
identify practices currently in use at mine sites, and encourage  their use where ever possible.

Comment  2:  The Background section  leaves the pejorative implication that the only reason a
pollution prevention plan was prepared was that it was  required by the State and makes a point that it
was not conceived  and prepared as part of the environmental program.

Response:  The text has been amended to reflect the  fact that Cyprus went to considerable lengths to
involve its workforce in the preparation and implementation of it's plan.  EPA is aware that the
submittal of such a plan is a requirement established by the state! EPA is not implying however, that
Cyprus prepared the plan only because it was a regulatory requirement.

Comment 3:  Section 3: Cyprus Bagdad deliberately structured its Plan for each separate area as
separate plans.  ADEQ disagreed with this approach.

Response:  Text has been changed to reflect this position.

Comment 4:  Section 3: Cyprus has gone beyond notice to contractors, vendors, and service
companies.  Language has been inserted into their contracts to  require them to comply with the Plan.

Response:  Text has been changed to reflect this information.

Comment 5:  Section 3: Cyprus sends its scrap metal off-site for recycling.  Reference to ore in this
section is unclear.

Response:  Text has been changed to reflect this information.

Comment:  Section 3:  Page 4 states that truck washes  collect hydrocarbons and product residuals.
Only hydrocarbon residuals and sediment are collected. The sediment is  not recyclable.

Response:  Text has been changed to reflect this information.

Comment: Section 4:  The summary and conclusions section does not seem to offer any summary
and conclusions.

Response:  EPA believes this section adequately summarize the Cyprus Bagdad Copper Corporation's
Pollution Prevention Plan.


                                              104    U.S.  Environmental Protection Agency
                                                      Region 5, Library (PL-12J)
                                                     77 West Jackson Boulevard, 12th Floor
                                                     Chicago, IL  60604-3590

-------
                           Innovative Methods of Managing Environmental Releases at Mine Sites

Comment:  Section 4: The summary erroneously states that Bagdad is not in compliance with
existing Arizona environmental regulations.

Response:  Text has been changed to reflect this information.

Comment:  Section 4: The discussion of cost savings appears out of place.  Cyprus expects the
benefits of the program to equal the  costs in the long term.

Response:  The discussion of costs and benefits has been moved from the Summary to a new
subsection in Chapter 3.
                                             105

-------