»EPA
United States
Environmental Protection
Agency
Solid Waste And
Emergency Response
(5102 G)
SUPERFUND:
EPA/540/R-93/002
December 1992
PB93-963202
Progress at
National
Priority
List Sites
ALASKA
1992 UPDATE
Print fd on Recycled Paper
-------
Publication #9200.5-7036
December 1992
NATIONAL PRIORITIES LIST SITES:
Alaska
UNITED STATES ENVIRONMENTAL PROTECTION AGENCY
Office of Emergency & Remedial Response
Office of Program Management
Washington, DC 20460 tion Agency
U s. Environmental rroi
SSrssaf1—
-------
If you wish to purchase copies of any additional State volumes, contact:
National Technical Information Service (NTIS)
U.S. Department of Commerce
5285 Port Royal Road
Springfield, VA 22161
(703) 486-4650
The complete set of the 49 State reports may be ordered as PB93-963250.
-------
TABLE OF CONTENTS
INTRODUCTION
A Brief Overview of Superfund v
Streamlining Superfund: The Superfund Accelerated Cleanup Model ix
How Superfund Works x
THE VOLUME
How to Use the State Book ,xi
A SUMMARY OF THE STATE PROGRAM
.XV
THE NPL REPORT
Progress to Date xix
THE NPL FACT SHEETS i
THE GLOSSARY
Terms used in the NPL Book G-l
-------
INTRODUCTION
A BRIEF OVERVIEW OF SUPERFUND
During the second half of the Twentieth
Century, the environmental conse-
quences of more than 100 years of industrial-
ization in the United States became increas-
ingly clear. Authors such as Rachel Carson
wrote passionately about the often-hidden en-
vironmental effects of our modern society's
widespread use of chemicals and other haz-
ardous materials. Their audience was small at
first, but gradually their message spread.
Growing concern turned to action, as people
learned more about the environment and be-
gan to act on their knowledge
The 1970s saw environmental issues burst
onto the national scene and take hold in the
national consciousness. The first Earth Day
was observed in 1970, the year that the U.S.
Environmental Protection Agency (EPA) was
founded. By the end of the 1970s, Love Canal
in New York and the Valley of the Drums in
Kentucky had entered the popular lexicon as
synonyms for pollution and environmental
degradation.
Superfund Is Established
The industrialization that gave Americans the
world's highest standard of living also created
problems that only a national program could
address. By 1980, the U.S. Congress had
passed numerous environmental laws, imple-
mented by the EPA, but many serious hazard-
ous waste problems were slipping through the
cracks.
Responding to growing concern about public
health and environmental threats from uncon-
trolled releases of hazardous materials, the
U.S. Congress passed the Comprehensive En-
vironmental Response, Compensation, and
Liability Act (CERCLA). Popularly known as
Superfund, CERCLA had one seemingly
simple job—to uncover and clean up hazard-
ous materials spills and contaminated sites.
A Big Job
Few in Congress, the EPA, the environmen-
tal community, or the general public knew in
1980 just how big the nation's hazardous ma-
terials problem is. Almost everyone thought
that Superfund would be a short-lived pro-
gram requiring relatively few resources to
clean up at most a few hundred sites. They
were quite mistaken.
As the EPA set to work finding sites and
gauging their potential to harm people and
the environment, the number of sites grew.
Each discovery seemed to lead to another,
and today almost 36,000 hazardous waste
sites have been investigated as potential haz-
ardous waste sites. They are catalogued in
the EPA's computerized database, CERCLIS
(for the Comprehensive Environmental Re-
-------
INTRODUCTION
sponse, Compensation, and Liability Informa-
tion System).
The damage to public health and the environ-
ment that each site in CERCLIS might cause
is evaluated; many sites have been referred to
State and local governments for cleanup. The
EPA lists the nation's most serious hazardous
waste sites on the National Priorities List, or
NPL. (These Superfund sites are eligible for
federally-funded cleanup, but whenever pos-
sible the EPA makes polluters pay for the
contamination they helped create.) The NPL
now numbers 1,275 sites, with 50 to 100
added each year. By the end of the century,
the NPL may reach as many as 2,100 sites.
Superfund faces some of the most complex
pollution problems ever encountered by an
environmental program. Improperly stored or
disposed chemicals and the soil they contami-
nate are one concern. More difficult to correct
are the wetlands and bays, and the groundwa-
ter, lakes, and rivers often used for drinking
water that are contaminated by chemicals
spreading through the soil or mixing with
storm water runoff. Toxic vapors contaminate
the air at some sites, threatening the health of
people living and working near by.
Superfund aims to control immediate public
health and environmental threats by tackling
the worst problems at the worst sites first.
Wherever possible, Superfund officials use
innovative treatment techniques—many de-
veloped or refined by the EPA—to correct
hazardous materials problems once and for
all. Many of the treatment techniques they use
did not exist when the program was created.
The EPA Administrator had challenged Su-
perfund to complete construction necessary
for cleanup work at 130 NPL sites by the end
of the 1992 federal fiscal year. By September
30, 1992, the end of fiscal year 1992, con-
struction had been completed at a total of 149
NPL sites. Superfund is well on its way of
meeting the Administrator's goal of complet-
ing construction at 200 NPL sites by the end
of fiscal year 1993, and 650 sites by the end
of fiscal year 2000.
Quick Cleanup at
Non-NPL Sites
Long-standing hazardous waste sites are not
Superfund's only concern. The EPA also re-
sponds to hazardous spills and other emergen-
cies, hauling away chemicals for proper treat-
ment or disposal. Superfund teams perform or
supervise responses at rail and motor vehicle
accidents, fires, and other emergencies in-
volving hazardous substances. They also
evacuate people living and working near by,
if necessary, and provide clean drinking water
to people whose own water is contaminated.
Removal crews also post warning signs and
take other precautions to keep people and ani-
mals away from hazardous substances.
Superfund employee prepares equipment for groundwater
treatment.
VI
-------
INTRODUCTION
Quick Cleanups, or Removals, are not limited
to emergencies. When cleanup crews at con-
taminated sites find hazardous substances that
immediately threaten people or the environ-
ment, they act right away to reduce the threat
or to remove the chemicals outright. As the
EPA implements the Superfund Accelerated
Cleanup Model (SACM), more and more sites
will undergo quick cleanups, and many of
these will be cleaned up completely without
ever being included on the NPL. (See
"Streamlining Superfund: The Superfund Ac-
celerated Cleanup Model.")
Some of Superfund's most significant gains in
public health and environmental protection
have been won by the removal program. As of
March 31, 1992, the Emergency Response
Superfund employee removing drums from a Superfund site.
Program had logged more than 2,300 removal
completions since Superfund was established.
The Public's Role
Superfund is unique among federal programs
in its commitment to citizen participation. Al-
though the EPA is responsible for determin-
ing how dangerous a site is and how best to
clean it up, the Agency relies on citizen input
as it makes these decisions.
Community residents are often invaluable
sources of information about a hazardous
waste site, its current and previous owners,
and the activities that took place there. Such
information can be crucial to experts evaluat-
ing a site and its potential dangers.
Residents also comment on EPA cleanup
plans by stating their concerns and prefer-
ences at public meetings and other forums and
in formal, written comments to Agency pro-
posals. The EPA takes these comments and
concerns seriously, and has modified many
proposals in response to local concerns. For,
ultimately, it is the community and its citizens
that will live with the results of the EPA's de-
cisions and actions; it is only fair that citizens
participate in the process.
A Commitment to
Communication
The Superfund program is very serious about
public outreach and communication. Com-
munity relations coordinators are assigned to
each NPL site to help the public understand
the potential hazards present, as well as the
cleanup alternatives. Local information re-
positories, such as libraries or other public
buildings, have been established near each
NPL site to ensure that the public has an op-
portunity to review all relevant information
and the proposed cleanup plans.
The individual State volumes contain sum-
mary fact sheets on NPL sites in each State
and territory. Together, the fact sheets provide
a concise report on site conditions and the
progress made toward site cleanups as of
March 1992. The EPA revises these volumes
periodically to provide an up-to-date record of
program activities. A glossary of key terms
relating to hazardous waste management and
Superfund site cleanup is provided at the back
of this book.
VII
-------
INTRODUCTION
Superfund is, of course, a public program, and
as such it belongs to everyone of us. This vol-
ume, along with other State volumes, com-
prises the EPA's report on Superfund
progress to the program's owners for the year
1992.
VIII
-------
INTRODUCTION
STREAMLINING SUPERFUND: THE SUPERFUND
ACCELERATED CLEANUP MODEL
Historically, critics and supporters alike
have measured Superfund's progress
by the number of hazardous waste sites de-
leted from the NPL. Although easy enough to
tally, this approach is too narrow. It misses
the major gains Superfund makes by reducing
major risks at the nation's worst hazardous
sites long before all clean-up work is done
and the site deleted. It also ignores the Re-
moval Program's contributions to meeting
Superfund's twin mandates of maximizing
public health and environmental protection.
Renewing Superfund's commitment to rapid
protection from hazardous materials, the EPA
is streamlining the program. The Superfund
Accelerated Cleanup Model, or SACM, will
take Early Actions, such as removing hazard-
ous wastes or contaminated materials, while
experts study the site. SACM also will com-
bine similar site studies to reduce the time re-
quired to evaluate a site and its threats to
people and the environment. This way, imme-
diate public health and environmental threats
will be addressed while long-term cleanups
are being planned.
Emergencies such as train derailments and
motor vehicle accidents will continue to be
handled expeditiously. Teams of highly
trained technicians will swing into action
right away, coordinating the cleanup and re-
moval of hazardous substances to ensure pub-
lic safety as quickly as possible.
Breaking With Tradition
The traditional Superfund process begins with
a lengthy phase of study and site assessment,
but SACM will save time by combining sepa-
rate, yet similar, activities. Each EPA Region
will form a Decision Team of site managers,
risk assessors, community relations coordina-
tors, lawyers, and other experts to monitor the
studies and quickly determine whether a site
requires Early Action (taking less than five
years), Long-term Action, or both.
While the site studies continue, the Decision
Team will begin the short-term work required
to correct immediate public health or environ-
mental threats from the site. Besides remov-
ing hazardous materials, Early Actions in-
clude taking precautions to keep contaminants
from moving off the site and restricting access
to the site. Early Actions could eliminate most
human risk from these sites, and Superfund
will further focus its public participation and
public information activities on site assess-
ment and Early Action.
Long-Term Solutions
While Early Actions can correct many hazard-
ous waste problems—and provide the bulk of
public health and environmental protection—
some contamination will take longer to cor-
rect. Cleanups of mining sites, wetlands, estu-
aries, and projects involving incineration of
contaminants or restoration of groundwater
can take far longer than the three to five years
envisioned for Early Actions. Under SACM,
these sites will be handled much as they are
now.
Also under SACM, the EPA will continue its
pursuit of potentially responsible parties who
may have caused or contributed to site con-
tamination. Expedited enforcement and
procedures for negotiating potentially respon-
sible party settlements will secure their par-
ticipation. Superfund personnel will continue
to oversee clean-up work performed by poten-
tially responsible parties.
IX
-------
INTRODUCTION
HOW SUPERFUND WORKS
Each Superfund site presents a different
set of complex problems. The same haz-
ardous materials and chemicals often con-
taminate many sites, but the details of each
site are different. Almost always, soil is con-
taminated with one or more chemicals. Their
vapors may taint the air over and around the
site. Contaminants may travel through the soil
and reach underground aquifers which may be
used for drinking water, or they may spread
over the site to contaminate streams, ponds,
and wetlands. The contaminating chemicals
may interact with each other, presenting even
more complicated cleanup problems.
Superfund's cleanup process is arduous and
exacting. It requires the best efforts of hun-
dreds of experts in science and engineering,
public health, administration and manage-
ment, law, and many other fields.
The average NPL site takes from seven to ten
years to work its way through the system,
from discovery to the start of long-term
cleanup. Actual cleanup work can take years,
decades if contaminated groundwater must
be treated. Of course, imminent threats to
public health or the environment are cor-
rected right away.
The diagram to the right presents a simplified
view of the cleanup process. The major steps
in the Superfund process are:
• Site discovery and investigation to iden-
tify contaminants and determine whether
emergency action is required;
• Emergency site work such as removing
contaminants for proper treatment or dis-
posal, and securing the site to keep people
and animals away, if warranted by condi-
tions at the site;
• Site evaluation to determine how people
living and working nearby, and the envi-
ronment, may be exposed to site contami-
nants;
• Detailed studies to determine whether con-
ditions are serious enough to add the site to
the National Priorities List of sites eligible
for federally funded cleanup under Super-
fund;
• Selection, design, and implementation of a
cleanup plan, after a thorough review of
the most effective cleanup options, given
site conditions, contaminants present, and
their potential threat to public health or the
environment.
• Follow-up to ensure that the cleanup work
done at the site continues to be effective
over the long term.
The Superfund Process
From the earliest stages, EPA investigators
work hard to identify those responsible for the
contamination. As their responsibility is es-
tablished, the EPA negotiates with these "re-
sponsible parties" to pay for cleaning up the
problem they helped create. This "enforce-
ment first" policy saves Superfund Trust Fund
monies for use in cleanups where the respon-
sible parties cannot be identified, or where
they are unable to fund cleanup work.
-------
THE VOLUME
How to Use the State Book
The site fact sheets presented in this book
are comprehensive summaries that cover
a broad range of information. The fact sheets
describe hazardous waste sites on the NPL and
their locations, as well as the conditions
leading to their listing ("Site Description").
The summaries list the types of contaminants
that have been discovered and related threats
to public and ecological health ("Threats and
Contaminants"). "Cleanup Approach" pres-
ents an overview of the cleanup activities
completed, underway, or planned. The fact
sheets conclude with a brief synopsis of how
much progress has been made in protecting
public health and the environment. The
summaries also pinpoint other actions, such as
legal efforts to involve polluters responsible
for site contamination and community con-
cerns.
The fact sheets are arranged in alphabetical
order by site name. Because site cleanup is a
dynamic and gradual process, all site informa-
tion is accurate as of the date shown on the
bottom of each page. Progress always is being
made at NPL sites, and the EPA periodically
will update the site fact sheets to reflect recent
actions and will publish updated State vol-
umes. The following two pages show a ge-
neric fact sheet and briefly describe the infor-
mation under each section.
How Can You Use
This State Book?
You can use this book to keep informed about
the sites that concern you, particularly ones
close to home. The EPA is committed to
involving the public in the decision making
process associated with hazardous waste
cleanup. The Agency solicits input from area
residents in communities affected by Super-
fund sites. Citizens are likely to be affected
not only by hazardous site conditions, but also
by the remedies that combat them. Site clean-
ups take many forms and can affect communi-
ties in different ways. Local traffic may be
rerouted, residents may be relocated, tempo-
rary water supplies may be necessary.
Definitive information on a site can help
citizens sift through alternatives and make
decisions. To make good choices, you must
know what the threats are and how the EPA
intends to clean up the site. You must under-
stand the cleanup alternatives being proposed
for site cleanup and how residents may be
affected by each one. You also need to have
some idea of how your community intends to
use the site in the future, and you need to know
what the community can realistically expect
once the cleanup is complete.
The EPA wants to develop cleanup methods
that meet community needs, but the Agency
only can take local concerns into account if it
understands what they are. Information must
travel both ways in order for cleanups to be
effective and satisfactory. Please take this
opportunity to learn more, become involved,
and assure that hazardous waste cleanup at
"your" site considers your community's
concerns.
XI
-------
THE VOLUME
NPL LISTING HISTORY
Provides the dates when the
site was Proposed, made Final,
and Deleted from the NPL.
SITE RESPONSIBILITY
Identifies the Federal, State,
and/or potentially responsible
parties taking responsibility
for cleanup actions at the site.
ENVIRONMENTAL
PROGRESS
Summarizes the actions to
reduce the threats to nearby
residents and the surrounding
environment and the progress
towards cleaning up the site.
SITE NAME
EPA REGION XX
COUNTY NAME
LOCATION
STATE
EPA ID# ABCOOOOOOO
Threats and Contaminants
Response Action Status
Site Facts:
xxxxxxxxx xxxxxxxxxxxxx xxxxxxxxxx xxxx xxxxxxxx xxxx xx xxxx:
Environmental Progress
Site Repository
SITE REPOSITORY
Lists the location of the primary site repository. The site
repository may include community relations plans, public
meeting announcements and minutes, fact sheets, press
releases, and other site-related documents.
XII
-------
THE VOLUME
SITE DESCRIPTION
This section describes the location and history of the site. It includes descrip-
tions of the most recent activities and past actions at the site that have con-
tributed to the contamination. Population estimates, land usages, and nearby
resources give readers background on the local setting surrounding the site.
THREATS AND CONTAMINANTS
The major chemical categories of site contamination are noted, as well as
which environmental resources are affected. Icons representing each of the
affected resources (may include air, groundwater, surface water, soil, and
contamination to environmentally sensitive areas) are included in the margins
of this section. Potential threats to residents and the surrounding environ-
ments arising from the site contamination also are described.
CLEANUP APPROACH
This section contains a brief overview of how the site is being cleaned up.
RESPONSE ACTION STATUS
Specific actions that have been accomplished or will be undertaken to clean
up the site are described here. Cleanup activities at NPL sites are divided
into separate phases, depending on the complexity and required actions at the
site. Two major types of cleanup activities often are described: initial,
immediate, or emergency actions to quickly remove or reduce imminent
threats to the community and surrounding areas; and long-term remedial
phases directed at final cleanup at the site. Each stage of the cleanup strategy
is presented in this section of the summary. Icons representing the stage of
the cleanup process (initial actions, site investigations, EPA selection of the
cleanup remedy, engineering design phase, cleanup activities underway, and
completed cleanup) are located in the margin next to each activity descrip-
tion.
SITE FACTS
Additional information on activities and events at the site are included in this
section. Often details on legal or administrative actions taken by the EPA to
achieve site cleanup or other facts pertaining to community involvement with
the site cleanup process are reported here.
XIII
-------
THE VOLUME
The "icons," or symbols, accompanying the text allow the reader to see at a glance which envi-
ronmental resources are affected and the status of cleanup activities at the site.
Icons in the Threats
and Contaminants
Section
Contaminated Groundwater resources
in the vicinity or underlying the site.
(Groundwater is often used as a drink-
ing water source.)
Contaminated Surface Water and
Sediments on or near the site. (These
include lakes, ponds, streams, and
rivers.)
Contaminated Air in the vicinity of
the site. (Air pollution usually is
periodic and involves contaminated
dust particles or hazardous gas emis-
sions.)
Contaminated Soil and Sludges on or
near the site. (This contamination
category may include bulk or other
surface hazardous wastes found on the
site.)
Threatened or contaminated Environ-
mentally Sensitive Areas in the vicinity
of the site. (Examples include wet-
lands and coastal areas or critical
habitats.)
Icons in the Response
Action Status Section
Initial, Immediate, or Emergency
Actions have been taken or are
underway to eliminate immediate
threats at the site.
Site Studies at the site to determine
the nature and extent of contamination
are planned or underway.
Remedy Selected indicates that site
investigations have been concluded,
and the EPA has selected a final
cleanup remedy for the site or part of
the site.
Remedy Design means that engineers
are preparing specifications and
drawings for the selected cleanup
technologies.
Cleanup Ongoing indicates that the
selected cleanup remedies for the
contaminated site, or part of the site,
currently are underway.
Cleanup Complete shows that all
cleanup goals have been achieved for
the contaminated site or part of the
site.
XIV
-------
A SUMMARY OF THE STATE PROGRAM
xv
-------
Superfund Activities
in Alaska
The State of Alaska is located within EPA Region 10,
which also includes three northwestern States. The State
covers 586,412 square miles. According to the 1990
Census, Alaska experienced a 37 percent increase in
population between 1980 and 1990, and is ranked
forty-ninth in U.S. population with approximately
550,000 residents.
The State of Alaska has three statutes that provide enforcement authority for
.•r" site cleanup. The Alaska Oil and Hazardous Substance Releases Law, enacted in 1986 and
amended in 1989, authorizes a fund and grants the State the authority to compel polluter participation
in site cleanup, collect civil and criminal penalties, and recover the costs of State actions. The Haz-
ardous Substance Release Control Law of 1986 covers enforcement and other related provisions. The
Liability and Cost for Oil and Hazardous Substances Discharge Law, enacted in 1989 as a result of
the Exxon Valdez spill, grants the State the authority to compel polluters who are liable for contami-
nation to conduct or pay for cleanup activities, regardless of fault or amount of contributing pollution.
In addition to the 10 percent contribution from the State required by the Federal Superfund program,
the Oil and Hazardous Substance Release Response Fund may be used for emergency response
activities and long-term cleanup actions. The money in this fund is derived from a 5 cent per barrel
tax on oil. Monies from forfeited performance bonds, cost recovery, and penalties are placed into an
account separate from the Fund to support the same purposes. The State involves the community by
forming a citizen advisory panel for major cleanups and by establishing a Citizens' Oversight Council
on Oil and Hazardous Substances. Currently, 6 sites in the State of Alaska have been listed as final on
the NPL. No new sites have been proposed for listing in 1992.
The Department of Environmental Conservation
implements the Superfund Program in the State of Alaska
Activities responsible for hazardous
waste contamination in the State of
Alaska include:
Federal
Facilities
Facts about the six NPL sites
in Alaska:
Immediate Actions (such as removing
hazardous substances or restricting
site access) were performed at four
sites.
Three sites endanger sensitive envi-
ronments.
Five sites are located near residential
areas.
XVII
March 1992
-------
ALASKA
Most Sites Have Multiple Contaminants and
Contaminated Media:
Media Contaminated at Sites
Contaminants Found at Sites
Air
Surface
Water
Sediments
Soil
Ground-
water
10 20 30 40 50 60 70 80 90 100
Percentage of Sites
The Potentially Responsible
Party Pays...
In the State of Alaska, potentially responsible
parties are paying for or conducting cleanup
activities at one site.
Percentage of Sites
Heavy Metals
VOCs
PCBs
Dioxin
Creosotes
Pesticides/Herbicides
Other*
Acids
Petrochemicals/Explosives
Asbestos
100%
67%
67%
33%
33%
33%
33%
17%
17%
17%
'Other contaminants include tetrahydrofuran,
nitrate, and sulfate.
For Further Information on NPL Sites and Hazardous
Waste Programs in the State of Alaska Please Contact:
^ EPA Region 1 0 Superfund
Community Relations
ff National Response Center
"H* Department of Environmental
Conservation: Division of
Environmental Quality, Solid and
Hazardous Waste Program
«* EPA Region 1 0 Superfund Branch
* EPA Superfund Hotline
For information concerning
community involvement
To report a hazardous
waste emergency
For information about the
State's responsibility in the
Superfund Program
For information about the
Regional Superfund Program
Federal Superfund Program
For information about the
Federal Superfund Program
(206) 553-6901
(800) 424-8802
(907) 465*5150
(206)553-1987
(800) 424-9068
March 1992
xviii
-------
THE NPL REPORT
PROGRESS TO DATE
The following Progress Report lists all
sites currently on, or deleted from, the
NPL and briefly summarizes the status of ac-
tivities for each site at the time this report was
prepared. The steps in the Superfund cleanup
process are arrayed across the top of the chart,
and each site's progress through these steps is
represented by an arrow (O) indicating the
current stage of cleanup.
Large and complex sites often are organized
into several cleanup stages. For example,
separate cleanup efforts may be required to
address the source of the contamination,
hazardous substances in the groundwater, and
surface water pollution, or to clean up differ-
ent areas of a large site. In such cases, the
chart portrays cleanup progress at the site's
most advanced stage, reflecting the status of
site activities rather than administrative ac-
complishments.
^> An arrow in the "Initial Response" cate-
gory indicates that an emergency
cleanup, immediate action, or initial ac-
tion has been completed or currently is
underway. Emergency or initial actions
are taken as an interim measure to pro-
vide immediate relief from exposure to
hazardous site conditions or to stabilize
a site to prevent further contamination.
O A final arrow in the "Site Studies" cat-
egory indicates that an investigation to
determine the nature and extent of the
contamination at the site currently is on-
going or planned.
O A final arrow in the "Remedy Selection"
category means that the EPA has se-
lected the final cleanup strategy for the
site. At the few sites where the EPA has
determined that initial response actions
have eliminated site contamination, or
that any remaining contamination will
be naturally dispersed without further
cleanup activities, a "No Action" rem-
edy has been selected. In these cases,
the arrows are discontinued at the
"Remedy Selection" step and resume in
the "Construction Complete" category.
O A final arrow at the "Remedial Design"
stage indicates that engineers currently
are designing the technical specifica-
tions for the selected cleanup remedies
and technologies.
£> A final arrow in the "Cleanup Ongoing"
column means that final cleanup actions
have been started at the site and cur-
rently are underway.
O A final arrow in the "Construction Com-
plete" category is used only when all
phases of the site cleanup plan have
been performed, and the EPA has deter-
mined that no additional construction
actions are required at the site. Some
sites in this category currently may be
undergoing long-term operation and
maintenance or monitoring to ensure
that the cleanup actions continue to pro-
tect human health and the environment.
/ A check in the "Deleted" category indi-
cates that the site cleanup has met all
human health and environmental goals
and that the EPA has deleted the site
from the NPL.
Further information on the activities and
progress at each site is given in the site "Fact
Sheets" published in this volume.
xix
-------
CO
••^
>
IS
^^
^^^
o
0)
to
C/>
CD
*^
C
•^
***
0)
• HM
en
_i
0.
2
"co
Q.
3
C
CO
—
O
•o
CO
>
o
1-
co
0)
O)
E
Q.
I
01
0)
Q
c
.0.2
§0.
11
go
o
Q.O)
3.C
C0
s°>
oo
•o"^
•o *
11
Q) Q)
(0
CO 3
CO
0)
(A
11
c in
— «u
nr
Q)
(Q
Q
_j
Q.
Z
^
C
o
o
0)
E
ra
Z
CO
a
ti
ON
S
CJ2.
o
13
c
u.
oo
z
oo
CQ
U-
W
2
&
S
Z
UJ
S
| ALASKA BAT1
n
(i
o
c^
o
13
c
u.
oo
Z
00
CQ
eg
ou
oo
. 1
| ARCTIC SURP1
0
0
S
§
— I
13
c
u.
00
Z
oo
CQ
ti.
U4
<
CQ
pq
U
| EffiLSONAIR I
ft
f)
o
^1
oo
o
13
c
U-
uj
o
1
X
U
-------
ALASKA BA
ENTERPRISE
ALASKA
EPA ID# AKD004904215
EPA REGION 10
Fairbanks North Star County
1 1/2 miles south of Fairbanks
Site Description
Alaska Battery Enterprises manufactured batteries on a 1-acre site approximately 1 1/2 miles
south of Fairbanks. Used batteries were accepted for recycling, and battery parts and acid
were stored in a fenced, unpaved yard and inside a building on the site. Operations began in
1961, with the filling in of marshland with battery casings. Wash water, spills, and domestic
wastewater generated inside the building were discharged to an on-site septic tank and drain
field. Prior to 1988, used batteries were broken open on site, the acid was reused, and the
lead was shipped out of State. In 1986, the Alaska Department of Transportation, whose
right-of-way completely surrounds the site, found lead and acid in soil on and off the site.
The City of Fairbanks has a population of approximately 22,600. There are 12 schools within
3 miles of the site, as well as the Alaskaland Theme Park. Wetlands covering more than 5
acres are located within 1/2 mile to the northeast of the facility.
Site Responsibility: The site is being addressed through
Federal actions.
NPL LISTING HISTORY
Proposed Date: 06/24/88
Final Date: 03/31/89
Threats and Contaminants
The groundwater is believed to be contaminated with lead, nitrate, and sulfate.
The soil contains lead and acid. A potential hazard exists if individuals accidentally
ingest or come into direct contact with contaminated soil and groundwater. The
groundwater is shallow and the soil is permeable, conditions that facilitate the
movement of contaminants into the groundwater. Contamination from the site also
could adversely affect the freshwater wetland.
March 1992
-------
Cleanup Approach
The site is being addressed in two stages: an immediate action and a single long-term
remedial phase focusing on cleanup of the entire site.
Response Action Status
Immediate Action: In 1988, the EPA excavated contaminated soil and
stockpiled it in a lined trench on site. Test pits were dug to the shallow water
table, and water samples were collected for analysis. A total of 39 gondola rail
cars were loaded with 2,900 cubic yards of lead-contaminated soil, which were disposed of in
a federally approved facility. Areas of high lead content were capped with a liner and a foot
of topsoil. The EPA removed the remaining 800 cubic yards of soil in 1989.
Entire Site: In early 1990, the EPA began a detailed investigation to determine
the nature and the extent of the contamination. Field work was completed in late
1991. The results of the study indicated that there are no elevated levels of lead in
the groundwater. This will be confirmed by future groundwater monitoring activities. The
conclusions from this study and additional studies underway will assist in determining the final
cleanup method. In the summer of 1992, the EPA is scheduled to conduct a demonstration of
an innovative technology. This technology, soil washing, can potentially remove lead from the
remaining contaminated soil.
Environmental Progress
Excavating contaminated soil and capping parts of the Alaska Battery Enterprises site have
reduced the threat to human health and the environment while the investigation is taking
place and final cleanup actions are being planned.
Site Repository
Alaska Department of Environmental Conservation, 1001 Noble Street, Suite 350,
Fairbanks, AK 99701
March 1992 2 ALASKA BATTERY ENTERPRISES
-------
ARCTIC SURPfc
ALASKA
EPAID#AKD980988158
EPA REGION 10
Fairbanks North Star County
Fairbanks
Other Names:
McPeak Salvage
Site Description
The Arctic Surplus site occupies approximately 25 acres in southeast Fairbanks. Salvage
operations at the site were conducted from 1958 to 1989 by a number of parties. The
Department of Defense (DOD) owned a portion of the site from 1944 to 1957. On site are a
variety of buildings, storage trailers, and surplus military equipment. In 1988, the Alaska
Department of Environmental Conservation conducted a site inspection and detected
elevated levels of metals on site. In 1989, the EPA conducted a removal, fencing the site and
disposing of 2,200 pounds of bulk asbestos. Approximately 1,700 drums containing various
oils, fuels, and chemicals were removed from the site in 1990, along with quantities of
asbestos, batteries, PCB transformers, and ash piles from the incineration of transformer
casings. On-site groundwater monitoring indicates elevated levels of certain organic
compounds and metals. An unnamed shallow aquifer, which underlies the Tanana-Chena
flood plain, is the primary source of drinking water for residents near the site. The 1,000
residents within a 3-mile radius of the site are dependent on private domestic wells or bottled
water. Drinking water supplies off site are monitored twice yearly and have not exceeded safe
drinking water standards. In 1991, soil sampling identified areas of surface soil containing high
levels of polychlorinated biphenyls (PCBs) and lead. The Defense and Logistics Agency
(DLA) of DOD will begin an investigation of the site in 1992.
Site Responsibility:
The site is being addressed through
Federal and potentially responsible
parties' actions.
NPL LISTING HISTORY
Proposed Date: 10/26/89
Final Date: 08/30/90
Threats and Contaminants
On-site groundwater contains heavy metals including zinc and lead. On-site soil is
contaminated with heavy metals, polychlorinated biphenyls (PCBs), polycyclic
aromatic hydrocarbons (PAHs), asbestos, and pesticides. People ingesting or
coming into direct contact with contaminated groundwater and soil may suffer
adverse health effects. The Tanana and the Chena Rivers flow approximately 1
mile away from the site and could become polluted by the contaminants.
March 1992
-------
Cleanup Approach
The site is being addressed in two stages: emergency actions and a long-term remedial phase
focusing on cleanup of the entire site.
Response Action Status
Emergency Actions: In 1989, EPA emergency staff assessed the site and found
approximately 1,700 drums containing liquids and sludges, some flammable or
corrosive. The EPA overpacked leaking drums, removed and disposed of 2,200
pounds of loose asbestos, and erected a chain-link fence. In 1990, the DOD tested the drums
and disposed of hazardous liquids and sludges. Contaminated soils also were excavated and
disposed of in 1990. The EPA conducted additional activities in 1991, including a survey of
soil contamination, capping of contaminated soils, and removal and an investigation of
possible drum burial pits. On-site and off-site wells are monitored every six months by the
DLA.
Entire Site: An investigation to determine the nature and extent of
contamination at the site is scheduled to begin in late 1992. Based on the results
of the investigation, a remedy will be selected to cleanup the site.
Site Facts: Under an EPA Consent Order, the DLA within the DOD assumed responsibility
for emergency actions.
Environmental Progress
Overpacking leaking drums, removing loose asbestos, and installing a fence significantly
reduced the threat to human health and the environment posed by the Arctic Surplus site.
Additional emergency actions have addressed the potential for migration of contaminated
soils and ash to off-site residential areas.
Site Repository
Defense Reutilization & Marketing Office, Building 5001, 1/4 Mile Badger Road,
Fairbanks, AK 99703
March 1992 4 ARCTIC SURPLUS
-------
EIELSON Al
FORCE BAS
ALASKA
EPA ID#AK1570028646
EPA REGION 10
Fairbanks North Star County
Fairbanks North Star Borough
Site Description
The Eielson Air Force Base site covers 19,780 acres in Fairbanks North Star Borough, 24
miles southeast of Fairbanks. Since its establishment in 1944, its primary mission is providing
tactical support to the Alaskan Air Command. The site contains both closed and active
unlined landfills which extend into the groundwater, shallow trenches where weathered tank
sludge was buried, a drum storage area, and other disposal or spill areas. Sampling has
indicated numerous contaminants in the groundwater and soil. Several monitoring wells have
been converted into static recovery wells to remove floating petroleum products from area
groundwater, but to date only small quantities have been recovered. Approximately 6,000
people obtain drinking water from wells within 3 miles of hazardous substances on the base.
Surface water 3 miles downgradient of the base is used for fishing. The base is the flood plain
of the Tanana River.
Site Responsibility: The site is being addressed through
Federal actions.
NPL LISTING HISTORY
Proposed Date: 07/14/89
Final Date: 11/21/89
Threats and Contaminants
Groundwater contains lead and volatile organic compounds (VOCs) such as
benzene, xylene, and toluene. Soil is contaminated with heavy metals including
lead, arsenic, chromium, and zinc. Ingesting or coming into direct contact with
contaminated groundwater or soil may pose a potential health threat. If
contaminants leach into the nearby Tanana River, wildlife in and around the river
may be harmed.
March 1992
-------
Cleanup Approach
The site is being addressed in seven long-term remedial phases focusing on cleanup of three
fuel contamination areas, one group of landfills, one group of TCE spills, a group of drum
burial sites, and the entire site.
Response Action Status
Fuel Contamination: In 1991, the Air Force began investigating the nature and
extent of fuel contamination at one of three areas. The two other fuel
contaminated areas are expected to be investigated in 1993. Once the studies are
completed, measures for final cleanup will be recommended. Two interim actions to remove
floating petroleum products at two of the areas are scheduled to be determined; one in 1992
and the other in 1993.
TCE Spills: In 1992, the Air Force is scheduled to investigate the TCE spill areas
of the base to determine the type and extent of contamination. The investigation
will conclude with recommendations for cleanup.
Drum Burial Sites: In 1992, the Air Force is expected to begin conducting an
investigation into the nature and extent of contamination at the drum burial sites.
This investigation will conclude with recommendations for final site cleanup.
Landfills: In 1992, the Air Force is expected to begin an investigation into the
nature and extent of contamination at the landfill areas on the site. The completed
study will identify and recommend final cleanup alternatives for this area.
Entire Site: In 1991, the Air Force began an investigation to determine the
nature and extent of contamination at the entire Eielson Air Force Base. Once
remedies have been selected at all individual areas, the base will be evaluated
under this site-wide investigation scheduled for completion in 1996.
Site Facts: Eielson Air Force Base is participating in the Installation Restoration Program, a
specially funded program established by the Department of Defense (DOD) in 1978 to
identify, investigate, and control the migration of hazardous contaminants at military and
other DOD facilities. In May 1991, the Air Force and the EPA signed an Interagency
Agreement for this site.
Environmental Progress
Preliminary investigations have determined that the Eielson Air Force Base site does not
pose a threat to human health or the environment while investigations leading to the
selection of cleanup activities continue.
March 1992
EIELSON AIR FORCE BASE
-------
Site Repository
Not established.
EIELSON AIR FORCE BASE 7 March 1992
-------
ELMENDORF
FORCE BAS
ALASKA
EPA ID# AK8570028649
EPA REGION 10
Anchorage County
Immediately north of Anchorage
Other Names:
USAF-Elmendorf AFB
Site Description
The Elmendorf Air Force Base site covers approximately 13,130 acres near Anchorage. More
than half of the area at the site is undeveloped, including 1,416 acres of wetlands, lakes and
ponds. The remaining area has been developed for airfield operations (runways, taxiways, and
main tenance buildings), base support operations, housing, and recreational facilities. The Air
Force has identified 53 areas of possible site contamination. Initially, the focus was on five
areas including landfills D-5 (now closed) and D-7 (still active), which received a variety of
hazardous wastes, including lead acid batteries and waste solvents. The landfills, which are
not lined or bermed, are in sandy and heavily graveled soils. Shop wastes, including solvents
and paint thinners, were disposed of in an unlined trench designated as site D-17. Site IS-1 is
where fuel in Building 42-400 spilled into floor drains that feed into gravel-bottom dry wells.
The last of the five areas included in the initial investigation is site SP5, where approximately
60,000 gallons of aviation fuel JP-4 spilled, of which only 33,000 gallons were recovered.
Elmendorf employs about 7,400 people, 18 percent of which are civilians. Approximately
8,600 people currently live on the base. Approximately 121,000 individuals reside within 3
miles of the base. Drinking water for these residents is obtained from surface supplies located
12 to 30 miles north of the base. Emergency backup water supply wells for Elmendorf are
located within 3 miles of the identified contamination. Several sensitive environments such as
wetlands, moose habitats, and beaver dams exist within and adjacent to the areas of
contamination at the base.
Site Responsibility: The site is being addressed through
Federal actions.
NPL LISTING HISTORY
Proposed Date: 07/14/89
Final Date: 08/30/90
March 1992
-------
Threats and Contaminants
Soil and shallow groundwater beneath the various landfills, fuel storage facilities,
five training areas and maintenance hangars located on base are contaminated
with petroleum hydrocarbons and other fuel contaminants, volatile organic
compounds (VOCs), polyaromatic hydrocarbons (PAHs), polychlorinated biphenyls
(PCBs), pesticides, asphalt and associated chemicals, and heavy metals including
lead. No contaminants have been detected in the deeper confined aquifer at this
time. Potential health risks include future contamination of a drinking water
source, as well as accidental ingestion of or direct contact with contaminated
groundwater for soil. Local residents obtain their drinking water from the deeper
confined aquifer.
Cleanup Approach
The site is being addressed in eight stages: interim actions and seven long-term remedial
phases focusing on cleaning up the landfills, underground storage tanks, disposal and storage
facilities, the dry wells and floor drain spills, fuel spill areas, the bluff landfill, and the fire
training area.
Response Action Status
Interim Actions: In 1990, storage tanks were removed. In early 1991, more
storage tanks at another area were taken out of service and drained when testing
showed that all tanks were leaking.
Landfills: In 1991, the Air Force began investigation the nature and extent of
contamination at this landfill. Once the investigation is completed, effective
measures to clean up the landfill will be recommended.
Underground Storage Tanks: The Air Force currently is investigating the
nature and extent of contamination at this site. This site consists of two source
areas where underground storage tanks have been or are buried. An interim
cleanup is currently under consideration at one of these areas. A public comment period for
the interim cleanup will be conducted in 1992. Once the investigation is completed, effective
measures for final cleanup of the wastes will be recommended.
Disposal and Storage Facilities: In 1993, a study is scheduled to begin
exploring the nature and extent of contamination at the Cherry Hill Ditch, a shop
waste disposal site, and a PCB transformer storage facility. Once the investigation
is completed, effective measures to cleanup the site will be recommended.
ELMENDORF AIR FORCE BASE 9 March 1992
-------
Dry Wells and Floor Drain Spills: Floor drains are located at nine
maintenance facilities. It is suspected that at one time these floor drains emptied
into dry wells, leach fields, or storm drains. A limited field investigation will begin
in 1992 to determine the location of dry wells and leach fields. At the conclusion of the
limited field investigation, an interim cleanup may be initiated to excavate and remove
abandoned dry wells or leach fields. The comprehensive investigation at this site is scheduled
to begin in late 1992.
Fuel Spill Areas: In 1992, a study of the nature and extent of contamination of
six sources in the southern portion of the Base near Ship Creek is scheduled to
begin. Once the investigation is completed, effective measures to cleanup the site
Bluff Landfill: In late 1993, a study of the nature and extent of contamination at
this second landfill site is scheduled to begin. The site consists of the Hospital
Road and Knik Arm Bluff landfills and a disposal site.
Fire Training Area: In 1993, a study is scheduled to begin investigating the
nature and extent of contamination at the Fire Training Area. Once the
investigation is completed, effective measures to cleanup the site will be
recommended. A removal action is scheduled for the asphalt drum storage area in 1992. An
interim cleanup action is currently under consideration for the fire training area, and is
scheduled for 1993.
will be recommended.
Environmental Progress
The removal of storage tanks from two areas reduces the threats posed to human health and
the environment while investigations continue at the Elmendorf Air Force Base site.
Site Repository
Not established.
March 1992 10 ELMENDORF AIR FORCE BASE
-------
FORT WAIW
ALASKA \.
EPA ID#AK6210022426
EPA REGION 10
Fairbanks North Star County
Fairbanks North Star Borough
Other Names:
U.S. Army - Fort Walnwright
Site Description
Fort Wainwright, near Fairbanks, was established in 1947, with the primary mission of
training soldiers and testing equipment in arctic conditions. Industrial operations primarily
involved maintenance of aircraft and vehicles. Fort Wainwright is made up of several areas,
including a 4,473-acre cantonment area, which includes a 74-acre sanitary landfill. The landfill
has received waste oil, waste fuel, spent solvents, perchloroethylene-contaminated dry
cleaning filters, asbestos, paint residues, and fuel tank sludge since the mid-1950s. The landfill
is not lined or bermed and is built up higher than the surrounding land. A second
contaminated area is the 45-acre North Post Oxbow and Family Housing Area, located 3,500
feet from the landfill. The Army used this area for storage of petroleum products, solvents,
and other chemicals and for the disposal of power plant ash and slag containing chromium
and mercury. About 11,000 people, including the entire population of Fort Wainwright, obtain
drinking water from wells within 3 miles of the site. The Chena River, which is used for sport
fishing, is less than 3 miles downstream of the site.
Site Responsibility: The site is being addressed through
Federal actions.
NPL LISTING HISTORY
Proposed Date: 07/14/89
Final Date: 08/30/90
Threats and Contaminants
On-site groundwater is contaminated with lead, chromium, and tetrahydrofuran.
Soil contains chromium. Potential health threats to people include ingestion of or
direct contact with contaminated groundwater and soil.
11
March 1992
-------
Cleanup Approach
The site is being addressed in five long-term remedial phases focusing on cleanup of the base
landfill, the North Post Oxbow and Family Housing Area, the Fairbanks Fuel Terminal, the
Landfill Power Plant/Coal Storage/Fire Training Pits, and the Open Burning/Open
Detonation Area and new sources.
Response Action Status
Landfill: The U.S. Army is expected to begin a study of the base landfill in 1994
that will determine the nature and extent of groundwater and soil contamination
at the site. The study will define the contaminants of concern and will recommend
alternatives for the final groundwater and soil cleanup.
North Post Oxbow and Family Housing Area: Limited field investigations
are underway at the North Post Oxbow and Family Housing Area to make a
preliminary determination of the sources of contamination at the site. Once the
sources are identified, a more detailed investigation is expected to begin in 1994 to determine
the nature and extent of contamination and to recommend remedies for cleanup, if necessary.
Fairbanks Fuel Terminal: The U.S. Army is expected to begin a study in late
1992 that will determine the nature and extent of contamination at the Fairbanks
Fuel Terminal, including a fuel off-loading facility and portions of the Fairbanks
Pipeline. The investigation is scheduled for completion in 1995, at which time the selection of
cleanup alternatives will begin.
Landfill Power Plant/Coal Storage/Fire Training Pits: The U.S. Army is
expected to begin a study in late 1992 that will determine the nature and extent
of contamination at the Landfill Power Plant, the Coal Storage Yard, and the fire
Training Pits. The study is scheduled for completion in 1995, at which time the selection of
cleanup alternatives will begin.
Open Burning/Open Detonation and New Sources: The U.S. Army is
expected to begin a study in 1995 to explore the nature and extent of
contamination at the Open Burning/Open Detonation Area and to identify any
new sources of contamination. These investigations will lead to the selection of cleanup
remedies, if necessary.
Site Facts: Fort Wainwright is participating in the Installation Restoration Program, a
specially funded program established by the Department of Defense (DOD) in 1978 to
identify, investigate, and control the migration of hazardous contaminants at military and
other DoD facilities. A Federal Facilities Agreement was signed by the EPA, the Alaska
Department of Environmental Conservation and the Army in March 1992. This agreement
identifies the investigation schedules for Fort Wainwright.
March 1992 12 FORT WAINWRIGHT
-------
Environmental Progress
The Army has performed a preliminary assessment and has determined that the Fort
Wainwright site does not pose an immediate threat to human health or the environment
while investigations leading to final cleanup activities are being planned.
Site Repository
Not established.
FORT WAINWRIGHT
13
March 1992
-------
STANDARD ST
& METALS SAL
YARD (USDOT)
ALASKA
EPA ID# AKD980978787
Site Description
EPA REGION 10
Anchorage County
Anchorage
Other Names:
< l-DOT-Standard Steel
The Standard Steel & Metals Salvage Yard site covers approximately 6 acres in a heavily
industrialized area of Anchorage. The Federal Railroad Administration, part of the U.S.
Department of Transportation (DOT), acquired the land in the 1920s. Since 1972, the land
has been leased to several different recyclers whose activities included reclamation of
polychlorinated biphenyls (PCBs)-contaminated electrical transformers, salvaging of assorted
batteries, and processing of various types of equipment and drums from nearby military bases.
In 1982, the land was leased to Standard Steel & Metals. The site contains transformers, bulk
tanks, an incinerator, a metal crusher, drums and containers, and other items associated with
salvage operations. In 1985, the EPA detected low levels of PCBs in the sediment of nearby
Ship Creek. In 1987, the EPA detected contaminants in on-site groundwater. Over 121,000
people obtain drinking water from wells within 3 miles of the site. Ship Creek is used for
sport fishing and is a salmon migratory stream.
Site Responsibility:
The site is being addressed through
Federal actions.
NPL LISTING HISTORY
Proposed Date: 07/14/89
Final Date: 08/30/90
Threats and Contaminants
Chlorinated dioxin and furan have been detected in the ash near the on-site
incinerator. Soils contain PCBs, solvents, and lead. On-site groundwater is
contaminated with lead, PCBs, and tetrachloroethylene. Sediments in Ship Creek
are contaminated with PCBs. People may be exposed to pollutants through
accidental ingestion of or direct contact with contaminated groundwater, soil,
sediments, or ash. Contaminants that have bioaccumulated in fish and other
wildlife also may pose a health threat to people.
14
March 1992
-------
Cleanup Approach
The site is being addressed in two stages: immediate actions and a single long-term remedial
phase focusing on cleanup of the entire site.
Response Action Status
Immediate Actions: In 1986, the EPA removed surface wastes, including an
estimated 8,500 batteries, 175 transformers, 1,100 drums, three bulk storage
tanks, assorted containers, and metal debris, and transported the materials to
federally regulated disposal facilities. In 1988, the EPA sealed the surface soil in the most
highly contaminated areas, removed the remaining containers of hazardous materials, and
strengthened the security fence.
Entire Site: Negotiations for conducting an investigation into the type and extent
of contamination at the site began in early 1992. The potentially responsible
parties have made a good faith offer to begin investigations in 1992 which will
result in recommendations for the final cleanup of the site.
Environmental Progress
The EPA's immediate actions of removing batteries, transformers, drums, tanks, debris,
sealing highly contaminated surface soil, and strengthening the security fence have
significantly reduced the threat of exposure to contaminants while investigations leading to
final site cleanup are being planned.
Site Repository
Not established.
STANDARD STEEL & METALS 15 March 1992
SALVAGE YARD (USDOT)
-------
GLOSSARY
Terms Used in the NPL Book
This glossary defines terms used throughout the NPL Volumes. The terms and
abbreviations contained in this glossary apply specifically to work performed
under the Superfund program in the context of hazardous waste management. These
terms may have other meanings when used in a different context. A table of common
toxic chemicals found at NPL sites, their sources, and their potential threats is located
on page G-15
Acids: Substances, characterized by low pH
(less than 7.0), that are used in chemical manu-
facturing. Acids in high concentration can be
very corrosive and react with many inorganic
and organic substances. These reactions possi-
bly may create toxic compounds or release
heavy metal contaminants that remain in the
environment long after the acid is neutralized.
Administrative Order On Consent: A
legal and enforceable agreement between the
EPA and the parties potentially responsible for
site contamination. Under the terms of the
Order, the potentially responsible parties (PRPs)
agree to perform or pay for site studies or
cleanups. It also describes the oversight rules,
responsibilities, and enforcement options that
the government may exercise in the event of
non-compliance by potentially responsible
parties. This Order is signed by PRPs and the
government; it does not require approval by a
judge.
Administrative Order [Unilateral]: A
legally binding document issued by the EPA,
directing the parties potentially responsible to
perform site cleanups or studies (generally, the
EPA does not issue Unilateral Orders for site
studies). This type of Order is not signed by the
PRPs and does not require approval by a judge.
Aeration: A process that promotes breakdown
of contaminants in soil or water by exposing
them to air.
Agency for Toxic Substances and Dis-
ease Registry (ATSDR): The Federal
agency within the U.S. Public Health Service
charged with carrying out the health-related
responsibilities of CERCLA.
Air Stripping: A process whereby volatile
organic chemicals (VOCs) are removed from
contaminated material by forcing a stream of air
through the contaminated material in a pressur-
ized vessel. The contaminants are evaporated
into the air stream. The air may be further
treated before it is released into the atmosphere.
Ambient Air: Any unconfined part of the
atmosphere. Refers to the air that may be
inhaled by workers or residents in the vicinity of
contaminated air sources.
Applicable or Relevant and Appropriate
Requirements (ARARs): Federal, State, or
local laws which apply to Superfund activities at
NPL sites. Both emergency and long-term
actions must comply with these laws or provide
sound reasons for allowing a waiver. ARARs
must be identified for each site relative to the
characteristics of the site, the substances found
at the site, or the cleanup alternatives being
considered for the site.
G-1
-------
GLOSSARY
Aquifer: An underground layer of rock, sand,
or gravel capable of storing water within cracks
and pore spaces, or between grains. When
water contained within an aquifer is of sufficient
quantity and quality, it can be tapped and used
for drinking or other purposes. The water
contained in the aquifer is called groundwater.
A "sole source aquifer" supplies 50 percent or
more of the drinking water of an area.
Artesian (Well): A well made by drilling into
the earth until water is reached, which, due to
internal pressure, flows up like a fountain.
Asbestos: A mineral fiber that can pollute air
or water and is known to cause cancer or
asbestosis when inhaled.
Attenuation: The naturally occurring process
by which a compound is reduced in concentra-
tion over time through adsorption, degradation,
dilution, or transformation.
Background Level: The amount of a sub-
stance typically found in the air, water, or soil
from natural, as opposed to human, sources.
Baghouse Dust: Dust accumulated in
removing particulates from the air by passing it
through cloth bags in an enclosure.
Bases: Substances characterized by high pH
(greater than 7.0), which tend to be corrosive in
chemical reactions. When bases are mixed with
acids, they neutralize each other, forming salts.
Berm: A ledge, wall, or a mound of earth used
to prevent the migration of contaminants.
Bioaccumulate: The process by which some
contaminants or toxic chemicals gradually
collect and increase in concentration in living
tissue, such as in plants, fish, or people, as they
breathe contaminated air, drink contaminated
water, or eat contaminated food.
Biological Treatment: The use of bacteria
or other microbial organisms to break down
toxic organic materials into carbon dioxide and
water.
Bioremediation: A cleanup process using
naturally occurring or specially cultivated
microorganisms to digest contaminants and
break them down into non-hazardous compo-
nents.
Bog: A type of wetland that is covered with
peat moss deposits. Bogs depend primarily on
moisture from the air for their water source, are
usually acidic, and are rich in plant residue [see
Wetland].
Boom: A floating device used to contain oil
floating on a body of water or to restrict the
potential overflow of waste liquids from
containment structures.
Borehole: A hole that is drilled into the
ground and used to sample soil or ground-water.
Borrow Pit: An excavated area where soil,
sand, or gravel has been dug up for use else-
where.
Cap: A layer of material, such as clay or a
synthetic material, used to prevent rainwater
from penetrating and spreading contaminated
materials. The surface of the cap generally is
mounded or sloped so water will drain off.
Carbon Adsorption: A treatment system in
which contaminants are removed from ground-
water and surface water by forcing water
through tanks containing activated carbon, a
specially treated material that attracts and holds
or retains contaminants.
Carbon Disulfide: A degreasing agent
formerly used extensively for parts washing.
This compound has both inorganic and organic
G-2
-------
GLOSSARY
properties, which increase cleaning efficiency.
However, these properties also cause chemical
reactions that increase the hazard to human
health and the environment.
Carbon Treatment: [see Carbon Adsorp-
tion],
Cell: In solid waste disposal, one of a series of
holes in a landfill where waste is dumped,
compacted, and covered with layers of dirt.
CERCLA: [see Comprehensive Environmen-
tal Response, Compensation, and Liability Act].
Characterization: The sampling, monitoring,
and analysis of a site to determine the extent and
nature of toxic releases. Characterization
provides the basis for acquiring the necessary
technical information to develop, screen, ana-
lyze, and select appropriate cleanup techniques.
Chemical Fixation: The use of chemicals to
bind contaminants, thereby reducing the poten-
tial for leaching or other movement.
Chromated Copper Arsenate: An insecti-
cide/herbicide formed from salts of three toxic
metals: copper, chromium, and arsenic. This
salt is used extensively as a wood preservative
in pressure-treating operations. It is highly toxic
and water-soluble, making it a relatively mobile
contaminant in the environment
Cleanup: Actions taken to eliminate a release
or threat of release of a hazardous substance.
The term "cleanup" sometimes is used inter-
changeably with the terms remedial action,
removal action, response action, or corrective
action.
Closure: The process by which a landfill stops
accepting wastes and is shut down under Federal
guidelines that ensure the protection of the
public and the environment.
Comment Period: A specific interval during
which the public can review and comment on
various documents and EPA actions related to
site cleanup. For example, a comment period is
provided when the EPA proposes to add sites to
the NPL. Also, there is minimum 3-week
comment period for community members to
review and comment on the remedy proposed to
clean up a site.
Community Relations: The EPA effort to
establish and maintain two-way communication
with the public. The goals of community
relations programs include creating an under-
standing of EPA programs and related actions,
assuring public input into decision-making
processes related to affected communities, and
making certain that the Agency is aware of, and
responsive to, public concerns. Specific com-
munity relations activities are required in
relation to Superfund cleanup actions [see
Comment Period].
Comprehensive Environmental Re-
sponse, Compensation, and Liability
Act (CERCLA): Congress enacted the
CERCLA, known as Superfund, in 1980 to
respond directly to hazardous waste problems
that may pose a threat to the public health and
the environment. The EPA administers the
Superfund program.
Confluence: The place where two bodies of
water, such as streams or rivers, come together.
Confined Aquifer: An aquifer in which
groundwater is confined under pressure that is
significantly greater than atmospheric pressure.
G-3
-------
GLOSSARY
Consent Decree: A legal document, ap-
proved and issued by a judge, formalizing an
agreement between the EPA and the parties
potentially responsible for site contamination.
The decree describes cleanup actions that the
potentially responsible parties are required to
perform, or the costs incurred by the govern-
ment that the parties will reimburse, and the
roles, responsibilities, and enforcement options
that the government may exercise in the event of
non-compliance by potentially responsible
parties. If a settlement between the EPA and a
potentially responsible party includes cleanup
actions, it must be in the form of a Consent
Decree. A Consent Decree is subject to a public
comment period.
Consent Order: [see Administrative Order
on Consent].
Containment: The process of enclosing or
containing hazardous substances in a structure,
typically in a pond or a lagoon, to prevent the
migration of contaminants into the environment.
Contaminant: Any physical, chemical,
biological, or radiological material or substance
whose quantity, location, or nature produces
undesirable health or environmental effects.
Contingency Plan: A document setting
out an organized, planned, and coordinated
course of action to be followed in case of a
fire, explosion, or other accident that releases
toxic chemicals, hazardous wastes, or radioac-
tive materials into the environment.
Cooperative Agreement: A contract
between the EPA and the States, wherein a State
agrees to manage or monitor certain site cleanup
responsibilities and other activities on a cost-
sharing basis.
Cost Recovery: A legal process by which
potentially responsible parties can be required
to pay back the Superfund program for money
it spends on any cleanup actions [see Poten-
tially Responsible Parties].
Cover: Vegetation or other material placed
over a landfill or other waste material. It can
be designed to reduce movement of water into
the waste and to prevent erosion that could
cause the movement of contaminants.
Creosotes: Chemicals used in wood pre-
serving operations and produced by distilla-
tion of tar, including polycyclic aromatic
hydrocarbons and polynuclear aromatic
hydrocarbons [see PAHs' and PNAs]. Con-
taminating sediments, soils, and surface
water, creosotes may cause skin ulcerations
and cancer through prolonged exposure.
Culvert: A pipe used for drainage under a
road, railroad track, path, or through an embank-
ment.
Decommission: To revoke a license to
operate and take out of service.
Degradation: The process by which a chemi-
cal is reduced to a less complex form.
Degrease: To remove grease from wastes,
soils, or chemicals, usually using solvents.
Deletion: A site is eligible for deletion from
the NPL when Superfund response actions at the
site are complete. A site is deleted from the
NPL when a notice is published in the Federal
Register.
De minimis: This legal phrase pertains to
settlements with parties who contributed small
amounts of hazardous waste to a site. This
process allows the EPA to settle with small, or
de minimis contributors, as a single group rather
than as individuals, saving time, money, and
effort.
Dewater: To remove water from wastes, soils,
or chemicals.
G-4
-------
GLOSSARY
Dike: A low wall that can act as a barrier to
prevent a spill from spreading.
Dioxin: An organic chemical by-product of
pesticide manufacture which is known to be one
of the most toxic man-made chemicals.
Disposal: Final placement or destruction of
toxic, radioactive, or other wastes; surplus or
banned pesticides or other chemicals; polluted
soils; and drums containing hazardous materials.
Disposal may be accomplished through the use
of approved secure landfills, surface impound-
ments, land farming, deep well injection, or
incineration.
Down gradient: A downward hydrologic
slope that causes groundwater to move toward
lower elevations. Therefore, wells downgradi-
ent of a contaminated groundwater source are
prone to receiving pollutants.
Ecological Assessment: A study of the
impact of man-made or natural activity on living
creatures and their environment
Effluent: Wastewater, treated or untreated,
that flows out of a treatment plant, sewer, or
industrial outfall. Generally refers to wastes
discharged into surface waters.
Emission: Pollution discharged into the
atmosphere from smokestacks, other vents, and
surface areas of commercial or industrial facili-
ties.
Emulsifiers: Substances that help in mixing
materials that do not normally mix; e.g., oil and
water.
Endangerment Assessment: A study
conducted to determine the risks posed to public
health or the environment by contamination at
NPL sites. The EPA or the State conducts the
study when a legal action is to be taken to direct
the potentially responsible parties to clean up a
site or pay for the cleanup. An endangerment
assessment supplements an investigation of the
site hazards.
Enforcement: EPA, State, or local legal
actions taken against parties to facilitate
settlements; to compel compliance with laws,
rules, regulations, or agreements; or to obtain
penalties or criminal sanctions for violations.
Enforcement procedures may vary, depending
on the specific requirements of different
environmental laws and related regulatory
requirements. Under CERCLA, for example,
the EPA will seek to require potentially
responsible parties to clean up a Superfund
site or pay for the cleanup [see Cost Recov-
ery].
Erosion: The wearing away of land surface
by wind or water. Erosion occurs naturally
from weather or surface runoff, but can be
intensified by such land-related practices as
farming, residential or industrial develop-
ment, road building, or timber-cutting. Ero-
sion may spread surface contamination to off-
site locations.
Estuary (estuarine): Areas where fresh
water from rivers and salt water from
nearshore ocean waters are mixed. These
areas may include bays, mouths of rivers, salt
marshes, and lagoons. These water ecosys-
tems shelter and feed marine life, birds, and
wildlife.
Evaporation Ponds: Areas where sewage
sludge or other watery wastes are dumped and
allowed to dry out.
Feasibility Study: The analysis of the
potential cleanup alternatives for a site. The
feasibility study usually starts as soon as the
remedial investigation is underway. In this
volume, the feasibility study is referred to as a
site study [see also Remedial Investigation].
G-5
-------
GLOSSARY
Filtration: A treatment process for remov-
ing solid (particulate) matter from water by
passing the water through sand, activated
carbon, or a man-made filter. The process is
often used to remove particles that contain
contaminants.
Flood Plain: An area along a river, formed
from sediment deposited by floods. Flood
plains periodically are innundated by natural
floods, which can spread contamination.
Flue Gas: The air that is emitted from a
chimney after combustion in the burner
occurs. The gas can include nitrogen oxides,
carbon oxides, water vapor, sulfur oxides,
particles, and many chemical pollutants.
Fly Ash: Non-combustible residue that results
from the combustion of flue gases. It can
include nitrogen oxides, carbon oxides, water
vapor, sulfur oxides, as well as many other
chemical pollutants.
French Drain System: A crushed rock drain
system constructed of perforated pipes, which is
used to drain and disperse wastewater.
Gasification (coal): The conversion of soft
coal into gas for use as a fuel.
General Notice Letter: [See Notice Letter].
Generator: A facility that emits pollutants
into the air or releases hazardous wastes into
water or soil.
Good Faith Offer: A voluntary offer, gener-
ally in response to a Special Notice letter, made
by a potentially responsible party, consisting of
a written proposal demonstrating a potentially
responsible party's qualifications and willing-
ness to perform a site study or cleanup.
Groundwater: Water that fills pores in soils
or openings in rocks to the point of saturation.
In aquifers, groundwater occurs in sufficient
quantities for use as drinking and irrigation
water and other purposes.
Groundwater Quality Assessment: The
process of analyzing the chemical characteris-
tics of groundwater to determine whether any
hazardous materials exist.
Halogens: Reactive non-metals, such as
chlorine and bromine. Halogens are very
good oxidizing agents and, therefore, have
many industrial uses. They are rarely found
by themselves; however, many chemicals
such as polychlorinated biphenyls (PCBs),
some volatile organic compounds (VOCs),
and dioxin are reactive because of the pres-
ence of halogens.
Hazard Ranking System (HRS): The
principal screening tool used by the EPA to
evaluate relative risks to public health and the
environment associated with abandoned or
uncontrolled hazardous waste sites. The HRS
calculates a score based on the potential of
hazardous substances spreading from the site
through the air, surface water, or groundwater
and on other factors such as nearby popula-
tion. The HRS score is the primary factor in
deciding if the site should be on the NPL.
Hazardous Waste: By-products of society
that can pose a substantial present or potential
hazard to human health and the environment
when improperly managed. Hazardous waste
possesses at least one of four characteristics
(ignitability, corrosivity, reactivity, or toxic -
ity), or appears on special EPA lists.
Heavy Metals: Metallic elements with high
atomic weights, such as arsenic, lead, mercury,
and cadmium. Heavy metals are very hazardous
even at low concentrations and tend to accumu-
late in the food chain.
Herbicide: A chemical pesticide designed to
control or destroy plants, weeds, or grasses.
G-6
-------
GLOSSARY
Hot Spot: An area or vicinity of a site contain-
ing exceptionally high levels of contamination.
Hydrocarbons: Chemical compounds that
consist entirely of hydrogen and carbon.
Hydrology: The properties, distribution, and
circulation of water.
Hydrogeology: The geology of groundwater,
with particular emphasis on the chemistry and
movement of water.
Impoundment: A body of water or sludge
confined by a dam, dike, floodgate, or other
barrier.
Incineration: A group of treatment technolo-
gies involving destruction of waste by controlled
burning at high temperatures, e.g., burning
sludge to reduce the remaining residues to a
non-burnable ash that can be disposed of safely
on land, in some waters, or in underground
locations.
Infiltration: The movement of water or
other liquid down through soil from precipita-
tion (rain or snow) or from application of
wastewater to the land surface.
Influent: Water, wastewater, or other liquid
flowing into a reservoir, basin, or treatment
plant.
Injection Well: A well into which waste
fluids are placed, under pressure, for purposes
of disposal.
Inorganic Chemicals: Chemical sub-
stances of mineral origin, not of basic carbon
structure.
Installation Restoration Program: The
specially funded program established in 1978
under which the Department of Defense has
been identifying and evaluating its hazardous
waste sites and controlling the migration of
hazardous contaminants from those sites.
Intake: The source from where a water supply
is drawn, such as from a river or water body.
Interagency Agreement: A written agree-
ment between the EPA and a Federal agency
that has the lead for site cleanup activities,
setting forth the roles and responsibilities of the
agencies for performing and overseeing the
activities. States often are parties to interagency
agreements.
Interim (Permit) Status: Conditions under
which hazardous waste treatment, storage,
and disposal facilities, that were operating
when regulations under the RCRA became
final in 19X0, are temporarily allowed by the
EPA to continue to operate while awaiting
denial or issuance of a permanent permit. The
facility must comply with certain regulations
to maintain interim status.
Lagoon: A shallow pond or liquid waste
containment structure. Lagoons typically are
used for the storage of wastewaters, sludges,
liquid wastes, or spent nuclear fuel.
Landfarm: To apply waste to land or incor-
porate waste into the surface soil, such as
fertilizer or soil conditioner. This practice
commonly is used for disposal of composted
wastes and sludges.
Landfill: A disposal facility where waste is
placed in or on land. Sanitary landfills are
disposal sites for non-hazardous solid wastes.
The waste is spread in layers, compacted to the
smallest practical volume, and covered with soil
at the end of each operating day. Secure chemi-
cal landfills are disposal sites for hazardous
waste. They are designed to minimize the
chance of release of hazardous substances into
the environment [see Resource Conservation
and Recovery Act].
Leach, Leaching [v.t.]: The process by
which soluble chemical components are dis-
solved and carried through soil by water or
some other percolating liquid.
G-7
-------
GLOSSARY
Leachate [n]: The liquid that trickles through
or drains from waste, carrying soluble compo-
nents from the waste.
Leachate Collection System: A system
that gathers liquid that has leaked into a landfill
or other waste disposal area and pumps it to the
surface for treatment.
Liner: A relatively impermeable barrier
designed to prevent leachate (waste residue)
from leaking from a landfill. Liner materials
include plastic and dense clay.
Long-term Remedial Phase: Distinct,
often incremental, steps that are taken to solve
site pollution problems. Depending on the
complexity, site cleanup activities can be
separated into several of these phases.
Long-term Response Action: An action
which requires a continuous period of on-site
activity before cleanup goals are achieved.
These actions typically include the extraction
and treatment of groundwater and monitoring
actions.
Marsh: A type of wetland that does not
contain peat moss deposits and is dominated by
vegetation. Marshes may be either fresh or
saltwater and tidal or non-tidal [see Wetland].
Migration: The movement of oil, gas, con-
taminants, water, or other liquids through porous
and permeable soils or rock.
Mill Tailings: [See Mine Tailings].
Mine Tailings: A fine, sandy residue left from
mining operations. Tailings often contain high
concentrations of lead, uranium, and arsenic or
other heavy metals.
Mitigation: Actions taken to improve site
conditions by limiting, reducing, or controlling
toxicity and contamination sources.
Modeling: A technique using a mathematical
or physical representation of a system or theory
that tests the effects that changes on system
components have on the overall performance of
the system.
Monitoring Wells: Special wells drilled at
specific locations within, or surrounding, a
hazardous waste site where groundwater can be
sampled at selected depths and studied to obtain
such information as the direction in which
groundwater flows and the types and amounts of
contaminates present.
National Priorities List (NPL): The
EPA's list of the most serious uncontrolled or
abandoned hazardous waste sites identified
for possible long-term cleanup under Super-
fund. The EPA is required to update the NPL
at least once a year.
Natural Attenuation: [See Attenuation].
Neutrals: Organic compounds that have a
relatively neutral pH, complex structure and,
due to their organic bases, are easily absorbed
into the environment. Water is the most
commonly known neutral, however, naphtha-
lene, pyrene, and trichlorobenzene also are
examples of neutrals.
Nitroaromatics: Common components of
explosive materials, which will explode if
activated by very high temperatures or pres-
sures; 2,4,6-Trinitrotoluene (TNT) is a
nitroaromatic.
Notice Letter: A General Notice Letter
notifies the parties potentially responsible for
site contamination of their possible liability. A
Special Notice Letter begins a 60-day formal
period of negotiation during which the EPA is
not allowed to start work at a site or initiate
enforcement actions against potentially respon-
sible parties, although the EPA may undertake
certain investigatory and planning activities.
G-8
-------
GLOSSARY
The 60-day period may be extended if the EPA
receives a good faith offer from the PRPs
within that period. [See also Good Faith Offer].
On-Scene Coordinator(OSC): The
predesignated EPA, Coast Guard, or Depart-
ment of Defense official who coordinates and
directs Superfund removal actions or Clean
Water Act oil- or hazardous-spill corrective
actions.
Operation and Maintenance: Activities
conducted at a site after a cleanup action is
completed to ensure that the cleanup or
containment system is functioning properly.
Organic Chemicals/Compounds:
Chemical substances containing mainly
carbon, hydrogen, and oxygen.
Outfall: The place where wastewater is
discharged into receiving waters.
Over packing: Process used for isolating
large volumes of waste by jacketing or encap-
sulating waste to prevent further spread or
leakage of contaminating materials. Leaking
drums may be contained within oversized
barrels as an interim measure prior to removal
and final disposal.
Pentachlorophenol (PCP): A synthetic,
modified petrochemical that may be used as a
wood preservative because of its toxicity to
termites and fungi. It is a common component
of creosotes and can cause cancer.
Perched (groundwater): Groundwater
separated from another underlying body of
groundwater by a confining layer, often clay or
rock.
Percolation: The downward flow or filtering
of water or other liquids through subsurface
rock or soil layers, usually continuing down-
ward to groundwater.
Pesticide: A substance or mixture of sub-
stances intended to prevent, destroy, or repel any
pest. If misused, pesticides can accumulate in
the foodchain and contaminate the environment.
Petrochemicals: Chemical substances
produced from petroleum in refinery operations
and as fuel oil residues. These include
fluoranthene, chrysene, mineral spirits, and
refined oils. Petrochemicals are the bases from
which volatile organic compounds (VOCs),
plastics, and many pesticides are made. These
chemical substances often are toxic to humans
and the environment.
Phenols: Organic compounds that are used in
plastics manufacturing and are by-products of
petroleum refining, tanning, textile, dye, and
resin manufacturing. Phenols are highly poison-
ous.
Physical Chemical Separation: The
treatment process of adding a chemical to a
substance to separate the compounds for further
treatment or disposal.
Pilot Testing: A small-scale test of a pro-
posed treatment system in the field to determine
its ability to clean up specific contaminants.
Plugging: The process of stopping the flow of
water, oil, or gas into or out of the ground
through a borehole or well penetrating the
ground.
Plume: A body of contaminated groundwater
flowing from a specific source. The movement
of the groundwater is influenced by such factors
as local groundwater flow patterns, the character
of the aquifer in which groundwater is con-
tained, and the density of contaminants [see
Migration].
Pollution: Generally, the presence of matter
or energy whose nature, location, or quantity
produces undesired health or environmental
effects.
G-9
-------
GLOSSARY
Polycyclic Aromatic Hydrocarbons or
Polyaromatic Hydrocarbons (PAHs):
PAHs, such as pyrene, are a group of highly
reactive organic compounds found in motor oil.
They are a common component of creosotes and
can cause cancer.
Polychlorinated Biphenyls (PCBs): A
group of toxic chemicals used for a variety of
purposes including electrical applications,
carbonless copy paper, adhesives, hydraulic
fluids, microscope immersion oils, and caulking
compounds. PCBs also are produced in certain
combustion processes. PCBs are extremely
persistent in the environment because they are
very stable, non-reactive, and highly heat
resistant. Chronic exposure to PCBs is believed
to cause liver damage. It also is known to
bioaccumulate in fatty tissues. PCB use and
sale was banned in 1979 with the passage of the
Toxic Substances Control Act.
Polynuclear Aromatic Hydrocarbons
(PNAs): PNAs, such as naphthalene, and
biphenyls, are a group of highly reactive organic
compounds that are a common component of
creosotes, which can be carcinogenic.
Polyvinyl Chloride (PVC): A plastic made
from the gaseous substance vinyl chloride. PVC
is used to make pipes, records, raincoats, and
floor tiles. Health risks from high concentra-
tions of vinyl chloride include liver cancer and
lung cancer, as well as cancer of the lymphatic
and nervous systems.
Potable Water: Water that is safe for drink-
ing and cooking.
Potentially Responsible Parties (PRPs):
Parties associated with a Superfund site who
may be liable for the cost of remedying the
release of hazardous substances. This may
include owners or operators of the site or trans-
porters who disposed of materials at the site.
PRPs may admit liability, or liability may be
determined by a court of law. PRPs may sign a
Consent Decree or Administrative Order on
Consent to participate in the site cleanup without
admitting liability.
Precipitation: The removal of solids from
liquid waste so that the solid and liquid portions
can be disposed of safely; the removal of
particles from airborne emissions. Electro-
chemical precipitation is the use of an anode or
cathode to remove the hazardous chemicals.
Chemical precipitation involves the addition of
some substance to cause the solid portion to
separate.
Preliminary Assessment: The process of
collecting and reviewing available information
about a known or suspected waste site or release
to determine if a threat or potential threat exists.
Pump and Treat: A groundwater cleanup
technique involving the extracting of contami-
nated groundwater from the subsurface and the
removal of contaminants, using one of several
treatment technologies.
Radionuclides: Elements, including radium
and uranium-235 and -238, which break down
and produce radioactive substances due to their
unstable atomic structure. Some are man-made,
and others are naturally occurring in the envi-
ronment. Radon, the gaseous form of radium,
decays to form alpha particle radiation, which
cannot be absorbed through skin. However, it
can be inhaled, which allows alpha particles to
affect unprotected tissues directly and thus cause
cancer. Radiation also occurs naturally through
the breakdown of granite.
RCRA: [See Resource Conservation and
Recovery Act].
Recharge Area: A land area where rainwater
saturates the ground and soaks through the earth
to reach an aquifer.
G-10
-------
GLOSSARY
Record of Decision (ROD): A public
document that explains which cleanup
alternative(s) will be used to clean up sites
listed on the NPL. It is based on information
generated during the remedial investigation
and feasibility study and consideration of
public comments and community concerns.
Recovery Wells: Wells used to withdraw
contaminants or contaminated groundwater.
Recycle: The process of minimizing waste
generation by recovering usable products that
might otherwise become waste.
Remedial Action (RA): The actual con-
struction or implementation phase of a
Superfund site cleanup following the remedial
design [see Cleanup].
Remedial Design: A phase of site cleanup
where engineers design the technical specifi-
cations for cleanup remedies and technolo-
gies.
Remedial Investigation: An in-depth
study designed to gather the data necessary to
determine the nature and extent of contamina-
tion at a Superfund site, establish the criteria
for cleaning up the site, identify the prelimi-
nary alternatives for cleanup actions, and
support the technical and cost analyses of the
alternatives. The remedial investigation is
usually done with the feasibility study. In this
volume, the remedial investigation is referred
to as a site study [see also Feasibility Study].
Remedial Project Manager (RPM): The
EPA or State official responsible for oversee-
ing cleanup actions at the site.
Remedy Selection: The selection of the
final cleanup strategy for the site. At the few
sites where the EPA has determined that
initial response actions have eliminated site
contamination, or that any remaining con-
tamination will be naturally dispersed without
further cleanup activities, a "No Action"
remedy is selected [see Record of Decision].
Removal Action: Short-term immediate
actions taken to address releases of hazardous
substances [see Cleanup].
Residual: The amount of a pollutant re-
maining in the environment after a natural or
technological process has taken place, e.g.,
the sludge remaining after initial wastewater
treatment, or the particulates remaining in air
after the air passes through a scrubber.
Resource Conservation and Recovery
Act (RCRA): A Federal law that established
a regulatory system to track hazardous sub-
stances from the time of generation to dis-
posal. The law requires safe and secure
procedures to be used in treating, transport-
ing, storing, and disposing of hazardous
substances. RCRA is designed to prevent
new, uncontrolled hazardous waste sites.
Retention Pond: A small body of liquid
used for disposing of wastes and containing
overflow from production facilities. Some-
times retention ponds are used to expand the
capacity of such structures as lagoons the
store waste.
Runoff: The discharge of water over land
into surface water. It can carry pollutants
from the air and land and spread contaminants
from its source.
Scrubber: An air pollution control device
that uses a spray of water or reactant or a dry
process to trap pollutants in emissions.
Sediment: The layer of soil, sand, and
minerals at the bottom of surface waters such
as streams, lakes, and rivers, that absorbs
contaminants.
G-11
-------
GLOSSARY
Seeps: Specific points where releases of
liquid, usually leachate, form from waste
disposal areas, particularly along the lower
edges of landfills.
Seepage Pits: A hole, shaft, or cavity in
the ground used for the storage of liquids,
usually in the form of leachate, from waste
disposal areas. The liquid gradually leaves
the pit by moving through the surrounding
soil.
Septage: Residue remaining in a septic tank
after the treatment process.
Sinkhole: A hollow depression in the land
surface in which drainage collects; associated
with underground caves and passages that
facilitate the movement of liquids.
Site Characterization: The technical pro-
cess used to evaluate the nature and extent of
environmental contamination, which is neces-
sary for choosing and designing cleanup mea-
sures and monitoring their effectiveness.
Site Inspection: The collection of informa-
tion from a hazardous waste site to determine
the extent and severity of hazards posed by the
site. It follows, and is more extensive than, a
preliminary assessment. The purpose is to
gather information necessary to score the site,
using the Hazard Ranking System, and to
determine if the site presents an immediate
threat that requires a prompt removal action.
Slag: The fused refuse or dross separated
from a metal in the process of smelting.
Sludge: Semi-solid residues from industrial
or water treatment processes that may be
contaminated with hazardous materials.
Slurry Wall: Barriers used to contain the flow
of contaminated groundwater or subsurface
liquids. Slurry walls are constructed by digging
a trench around a contaminated area and filling
the trench with an impermeable material that
prevents water from passing through it. The
groundwater or contaminated liquids trapped
within the area surrounded by the slurry wall
can be extracted and treated.
Smelter: A facility that melts or fuses ore,
often with an accompanying chemical change,
to separate the metal. Emissions from smelters
are known to cause pollution.
Soil Gas: Gaseous elements and compounds
that occur in the small spaces between par-
ticles of soil. Such gases can move through
or leave the soil or rock, depending on
changes in pressure.
Soil Vapor Extraction: A treatment
process that uses vacuum wells to remove
hazardous gases from soil.
Soil Washing: A water-based process for
mechanically scrubbing soils in-place to remove
undesirable materials. There are two ap-
proaches: dissolving or suspending them in the
wash solution for later treatment by conven-
tional methods, and concentrating them into a
smaller volume of soil through simple particle
size separation techniques [see Solvent Extrac-
tion].
Stabilization: The process of changing an
active substance into inert, harmless material,
or physical activities at a site that act to limit
the further spread of contamination without
actual reduction of toxicity.
Solidification/Stabilization: A chemical
or physical reduction of the mobility of
hazardous constituents. Mobility is reduced
through the binding of hazardous constituents
into a solid mass with low permeability and
resistance to leaching.
G-12
-------
GLOSSARY
Solvent: A substance capable of dissolving
another substance to form a solution. The
primary uses of industrial solvents are as
cleaners for degreasing, in paints, and in
Pharmaceuticals. Many solvents are flam-
mable and toxic to varying degrees.
Solvent Extraction: A means of separating
hazardous contaminants from soils, sludges,
and sediment, thereby reducing the volume of
the hazardous waste that must be treated. It
generally is used as one in a series of unit
operations. An organic chemical is used to
dissolve contaminants as opposed to water-
based compounds, which usually are used in
soil washing.
Sorption: The action of soaking up or
attracting substances. It is used in many
pollution control systems.
Special Notice Letter: [See Notice Let-
ter].
Stillbottom: Residues left over from the
process of recovering spent solvents.
Stripping: A process used to remove volatile
contaminants from a substance [see Air Strip-
ping].
Sumps: A pit or tank that catches liquid
runoff for drainage or disposal.
Superfund: The program operated under the
legislative authority of the CERCLA and
Superfund Amendments and Reauthorization
Act (SARA) to update and improve environ-
mental laws. The program has the authority to
respond directly to releases or threatened re-
leases of hazardous substances that may endan-
ger public health, welfare, or the environment
The "Superfund" is a trust fund that finances
cleanup actions at hazardous waste sites.
Surge Tanks: A holding structure used to
absorb irregularities in flow of liquids, including
liquid waste materials.
Swamp: A type of wetland that is dominated
by woody vegetation and does not accumulate
peat moss deposits. Swamps may be fresh or
saltwater and tidal or non-tidal [see Wetlands].
Thermal Treatment: The use of heat to
remove or destroy contaminants from soil.
Treatability Studies: Testing a treatment
method on contaminated groundwater, soil, etc.,
to determine whether and how well the method
will work.
Trichloroethylene (TCE): A stable, color-
less liquid with a low boiling point. TCE has
many industrial applications, including use as
a solvent and as a metal degreasing agent.
TCE may be toxic to people when inhaled,
ingested, or through skin contact and can
damage vital organs, especially the liver [see
Volatile Organic Compounds].
Unilateral [Administrative] Order: [see
Administrative Order].
Upgradient: An upward hydrologic slope;
demarks areas that are higher than contaminated
areas and, therefore, are not prone to contamina-
tion by the movement of polluted groundwater.
Vacuum Extraction: A technology used to
remove volatile organic compounds (VOCs)
from soils. Vacuum pumps are connected to a
series of wells drilled to just above the water
table. The wells are sealed tightly at the soil
surface, and the vacuum established in the soil
draws VOC-contaminated air from the soil
pores into the well, as fresh air is drawn down
from the surface of the soil.
G-13
-------
GLOSSARY
Vegetated Soil Cap: A cap constructed with
graded soils and seed for vegetative growth, to
prevent erosion [see Cap].
Vitrification: The process of electrically
melting wastes and soils or sludges to bind the
waste in a glassy, solid material more durable
than granite or marble and resistant to leaching.
Volatile Organic Compounds (VOCs):
VOCs are manufactured as secondary petro-
chemicals. They include light alcohols, acetone,
trichloroethylene, perchloroethylene,
dichloroethylene, benzene, vinyl chloride,
toluene, and methylene chloride. These poten-
tially toxic chemicals are used as solvents,
degreasers, paints, thinners, and fuels. Because
of their volatile nature, they readily evaporate
into the air, increasing the potential exposure to
humans. Due to their low water solubility,
environmental persistence, and widespread
industrial use, they are commonly found in soil
and groundwater.
Waste Treatment Plant: A facility that
uses a series of tanks, screens, filters, and
other treatment processes to remove pollut-
ants from water.
Wastewater: The spent or used water from
individual homes or industries.
Watershed: The land area that drains into a
stream or other water body.
Water Table: The upper surface of the
groundwater.
Weir: A barrier to divert water or other liquids.
Wetland: An area that is regularly saturated
by surface or groundwater and, under normal
circumstances, is capable of supporting
vegetation typically adapted for life in satu-
rated soil conditions. Wetlands are critical to
sustaining many species of fish and wildlife.
Wetlands generally include swamps, marshes,
and bogs. Wetlands may be either coastal or
inland. Coastal wetlands have salt or brackish
(a mixture of salt and fresh) water, and most
have tides, while inland wetlands are non-
tidal and freshwater. Coastal wetlands are an
integral component of estuaries.
Wildlife Refuge: An area designated for
the protection of wild animals, within which
hunting and fishing are either prohibited or
strictly controlled.
G-14
-------
GLOSSARY
Some Common Contaminants at NPL Sites
Category
Chemical Types
Sources
Potential Health
threats*
Met&fe
•Vblattle Organic
Creosotes
RacBatfon
Arsenic, Barium, Beryllium,
Cadmium, Cobalt, Copper,
Chromium, Lead, Manga-
nese, Mercury, Nickel,
Silver, Selenium, Zinc
Trichloroethylene (TCE),
Perchloroethylene (PCE),
Acetone, Benzene,
Ketone, Methyl chloride,
Toluene, Vinyl Chloride,
Dichlorethylene
Chlordane, DDT 4-4, DDE,
Heptachlor, Aldrin, Endrin,
Atrazine, Dieldrin, Toxa-
phene
Polyaromatic hydrocar-
bons (PAHs), Polynuclear
aromatics (PNAs),
Phenolic Tars, Pentachlo-
rophenol (PCP)
Radium-226, Radon,
Uranium-235, Uranium-
238
Electroplating, batteries,
paint pigments, photogra-
phy, smelting, thermom-
eters, fluorescent lights,
solvent recovery
Solvents and degreasers,
gasoline octane enhanc-
ers, oils and paints, dry
cleaning fluids, chemical
manufacturing.
Agricultural applications,
pesticide and herbicide
production
Electric transformers and
capacitors, insulators and
coolants, adhesives,
caulking compounds,
carbonless copy paper,
hydraulic fluids.
Wood preserving, fossil
fuel combustion
Mine tailings, radium
products, natural decay of
granites
Tumors, cancers, and kidney,
brain, neurological, bone and
liver damage
Cancers, kidney and liver
damage, impairment of the
nervous system resulting in
sleepiness and headaches,
leukemia
Various effects ranging from
nausea to nervous disorders.
Dioxin is a common by-product
of the manufacture of pesti-
cides and is both highly toxic
and a suspected carcinogen.
Cancer and liver damage.
Cancers and skin ulcerations
with prolonged exposure
Cancer
Sources: Toxic Chemicals—What They Are, How They Affect You (EPA, Region 5)
Glossary of Environmental Terms (EPA, 1988)
"The potential for risk due to these contaminants is linked to a number of factors; for example, the length and level of exposure
and environmental and health factors such as age.
*U.S. G.P.O.:1993-341-835:81023
G-15
------- |