METROPOLITAN SANITARY DISTRICT
        GREATER CHICAGO
                           SYSTEM
ENVIRONMENTAL IMPACT STATEMENT
            MAY 1975
             Prepared by:
  US ENVIRONMENTAL PROTECTION AGENCY
             REGION V
            Chicago, Illinois

-------
                   FINAL ENVIRONMENTAL IMPACT  STATEMENT

                                FOR THE

            METROPOLITAN SANITARY DISTRICT OF  GREATER CHICAGO

                  DES PLAINES - O'HARE CONVEYANCE  SYSTEM
                            PREPARED BY

          THE UNITED STATES ENVIRONMENTAL PROTECTION AGENCY

                             REGION V

                          CHICAGO, ILLINOIS
                           MAY, 1975
U.S. Environmental Protection Agency
Region 5,  Library (5PL-16)
230 S, Deurfcjrn Street, Boom 1670
Chicago,  IL   60604
                                                     ApHfoved  By:
                                                              to/MjL
                                                              T7 Mavr.    *T/l
Francis T. Mayo
Regional Administrat

-------
SUMMARY SHEET

1.  Name of Action (Check one)

    Administrative action (X)
    Legislative action    ( )

2.  Brief description of action indicating what states (and counties) are
    particularly affected.
         The proposed projects consist of a system of conveyance tunnels

    known as Upper Des Plaines Intercepting Sewers 20, 20A, 20B, 20C and

    21, and drop shafts to intercept and convey wastewater from a 65.2

    sq. mile service area in the Northwest region of the Metropolitan

    Sanitary District of Greater Chicago to the proposed O'Hare Water

    Reclamation Plant.  (A separate EIS has been prepared on the O'Hare

    Water Reclamation Plant).  Upper Des Plaines Intercepting Sewers 20,

    20A, and 21 will also intercept and convey flows from combined sewer

    outfalls presently discharging to Weller's Creek and Feehanville Ditch

    and will provide partial storage of the combined wastewater for later

    treatment at the proposed O'Hare Water Reclamation Plant.

         The O'Hare MSDGC service area consists of all or part of the

    following communities within Cook County:  Arlington Heights, Buffalo

    Grove, Des Plaines, Elk Grove, Mount Prospect, Prospect Heights, Rolling

    Meadows, and Wheeling, Illinois.

3.  Summary of Environmental Impact and adverse environmental effects.

    A.  Short Term Impacts

        1)  Construction

            a)  Blasting

-------
         Construction of the drop shaft access manholes and




         parts of some tunnels will require blasting.  To




         minimize the impacts of bias ting particle velocities




         will be restricted by matting and explosive charge




         selection to values that prevent any physical damage




         to surface structures and appropriate screening




         of dust particles will be required.




b)  Noise and Vibration




    1)   Blasting operations will be restricted to certain




         hours of the day.




    2)   Heavy machinery, trucks, and other vehicles will




         increase ambient noise levels in residential areas.




c)  Water Quality and Quantity




    1)   Dewatering of tunnels will temporarily lower the




         water table of the shallow aquifer.  No effect on




         local wells is anticipated.




    2)   Increased siltation in Higgins Creek during channel




         relocation and dewatering of the tunnels may occur.  A




         half hour detention time is being planned to minimize




         the siltation effect from dewatering of tunnels.




d)  Air Quality




    1)   Dust from construction activities at surface sites




         will be minimized by using hard paved surfaces and




         dust control measures.
                            ii

-------
            2)  Operation of heavy construction equipment powered




                by internal combustion engines will add to the air




                pollutant loading.  However, it is not anticipated




                that this would result in a significant temporary




                change in ambient air quality.




    2)  Operation Impacts




             All conveyance tunnels will be grouted and lined with




        concrete to minimize infiltration.  In general, some slight




        positive infiltration into the tunnels is planned to prevent




        possible degradation of the groundwater supplies from exfil-




        tration of combined sewage into the groundwater aquifers.




             Based on analyses of storms of record, groundwater levels




        and design parameters, occasional exfiltration into the ground-




        water aquifers might occur.  A groundwater well monitoring




        program is planned to discover any problems which may develop.




B.  Long Term Impacts




    1)  Combined sewage overflows to Weller's Creek and Feehanville



        Ditch will be reduced from approximately 80 to 6 flows a year.




        This would result in a 92% BOD reduction and 75% flow reduction




        in combined sewage waste overflows to Weller's Creek and




        Feehanville Ditch.




    2)  Relief of existing interceptors (which are presently overloaded




        during wet weather) will also be provided.




    3)  No adverse long term impacts are anticipated.
                                     iii

-------
Alternatives Considered:

a)  Separation of combined sewers and construction of

    conventional interceptors.

b)  Collection and conveyance of combined overflows.

c)  Collection, conveyance and storage of combined overflows.

Irreversible and Irretrievable Commitment of Resources

a)  Labor and energy expended in construction of the

    proposed facilities and,

b)  Capital cost of tunnels is not recoverable.

The following Federal,State and local agencies are being requested to

comment on this Draft Environmental Impact Statement:

     Council on Environmental Quality
     Department of Agriculture
          Soil Conservation Service
     U.S. Army Corps of Engineers
          North Central Division
          Chicago District
     Department of Health, Education and Welfare
     Department of Housing and Urban Development
     Department of the Interior
          Bureau of Outdoor Recreation
          Fish and Wildlife Service
          Geological Survey
     Department of Transportation
          Federal Aviation Administration
     Energy Research and Development Administration
          Argonne National Laboratory

     Governor of Illinois
     Illinois Institute for Environmental Quality
     Illinois Environmental Protection Agency
     Illinois Division of Waterways
     Illinois Department of Conservation
     Illinois Department of Public Health

     Northeastern Illinois Planning Commission
     Cook County Department of Environmental Control
                                      iv

-------
         Metropolitan Sanitary District of Greater Chicago

         City of Des Plaines
         Village of Elk Grove
         Village of Arlington Heights
         Village of Mount Prospect
         Village of Palatine
         Village of Wheeling

         Others

7.  Date Draft made available to:

    a)  Council on Environmental Quality - March 7,  1975

    b)  Public - March 7,  1975

Acknowledgement

         Portions of this Environmental Impact Statement were taken directly

    from  the Environment Assessment prepared by the MSDGC (November, 1974),

    and the"Facilities Planning Study - MDSGC Overview Report" and%0'Hare

    Facility Area" (January, 1975) also prepared by the MSDGC.

-------
                           TABLE OF CONTENTS



Summary Sheet 	    i

Acknowledgment  	    v

1.  BACKGROUND	1-1

    A. Identification of Grant Applicants 	  1-1
    B. Description of the Proposed Actions  	  1-1
    C. General and Specific Location of the Proposed Actions  .  1-2
    D. Water Quality and Quantity Problems  	  1-3
       1. Sources of Water Supply in the Service Area ^ .  .  .  .  1-3
       2. Sanitary and Combined Sewers  	  1-6
    E. Other Water Quality and Quantity Objectives  	  1-0
    F. Costs and Financing	1-12
    History of the Application	1-12

2.  THE ENVIRONMENT WITHOUT THE PROPOSED PROJECT  	  2-1

    A. General	2-1
    B. Detailed Description 	  2-3
       1. Climate	2-3
       2. Topography	2-3
       3. Geology	2-4
       4. Soils	2-9
       5. Hydrology	2-9
          a. Surface Water	2-9
          b. Groundwater Aquifers in the Service Area ..... 2-13
          c. Water Quality Management 	 2-16
          d. Flood Hazards	2-17
       6. Biology	2-19
       7. Air Quality	2-19
          a. Particulate Matter 	 2-20
          b. Nitrogen Oxides	2-21
          c. Total Hydrocarbons 	 2-22
       8. Land Use	2-23
       9. Sensitive Areas	2-27
      10. Population Projections and Economic Forecasts .... 2-27
      11. Other Programs in the Area	2-29

3.  ALTERNATIVES	3-1

    A. Project Objectives   	  3-1
    B. Constraints	3-1
    C. Chronology of Plans and Studies	3-3
    D. Alternatives	3-4

-------
       1.   Sewer Separation 	   3-4
       2.   Conventional Interceptors  	   3-5
       3.   Collection and Conveyance of Combined Overflows  .  .  .   3-5
    E. Comparative Analysis of Alternatives 	   3-6
    F. Final Systems Screening  	   3-7
       1.   Separation with Interceptors 	   3-8
       2.   Collection, Conveyance & Storage of Combined Overflows   3-8
       3.   Collection and Conveyance of Combined Overflows  .  .  .  3-10

4.  DESCRIPTION OF THE PROPOS-ED ACTION	4-1

    A. Main Tunnel	4-1
    B. Branch Tunnels	4-1
    C. Sequencing of Tunnel Construction  	   4-3
    D. Main Shaft and Drop Shafts	4-5
    E. Access Manholes	4-9
    F. Relationship to Existing Facilities and Other Projects  .  .   4-9

5.  ENVIRONMENTAL EFFECTS OF THE PROPOSED ACTION  	   5-1

    A. Bedrock Geology	5-1
    B. Soils and Surficial Geology  	   5-6
    C. Hydrology	5-7
       1.   Surface Water	'.	5-7
       2.   Aquifers	5-9
    D. Land	5-16
    E. Air Quality	5-18
       1.   Construction Impacts 	  5-18
       2.   Operational Impacts  	  5-19
       3.   Mitigating Measures  	  5-19
    F. Biology	5-20
    G. Environmentally Sensitive Areas  	  5-20
    H. Aesthetics	5-20
    I. Noies and Vibration	5-21
    J. No Action Alternative	5-21
    K. Adverse impacts which cannot be avoided should the proposal
       be implemented and steps to minimize harm to the
       environment	5-22
    L. Relationship between local short term uses of man's
       environment and the maintenance and enhancement of long
       term productivity	5-23
    M. Irreversible and irretrievable commitments of resources
       to the proposed project should it be implemented	5-23
    N. Findings	5-23

6.  FEDERAL/STATE AGENCY COMMENTS AND PUBLIC PARTICIPATION, .  . .   6-1

    A. Government Agency Comments 	   6-1
    B. Public Groups and Citizens 	  6-41

-------
7.  SELECTED REFERENCES 	  7-1

    APPENDICES

    A. O'Hare Area Flood Control Activities
    B. MSDGC TARP Program
    C. Selection of O'Hare Service Area
    D. Geology
    E. Area Water Resources
    F. Water Conservation and Re-use Measures
    G. Water Quality Data

-------
                            CHAPTER 1

                            BACKGROUND



A.  Identification of Grant Applicant and Planners

         The grant applicant for the proposed conveyance system projects

    is the Metropolitan Sanitary District of Greater Chicago.  The Fa-

    cilities Planning Report for the Metropolitan Sanitary District of

    Greater Chicago is comprised of eight separate reports.  These reports

    consist of an overview report and individual reports for the seven

    facility areas.

B.  Description of the Proposed Actions

         The Upper Des Plaines tunnel conveyance system consists of four

    major elements.  These are:  the tunnels, eight drop shafts and one

    main shaft, seventy access manholes, and nine monitoring wells.  These

    elements will be constructed as five separate projects.  A brief

    description of each is given below.

         1.  Rock Tunnels and Drop Shafts; Weller's Creek, Central
             Road to Elmhurst Road, and Elmhurst Road, Upper Des
             Plaines 20 (73-317-2S).

             This project consists of constructing 22,000 linear feet of 20

             foot diameter tunnel in rock at a depth of 160 feet; five drop

             shafts; one main construction shaft, access manholes and mis-

             cellaneous and appurtenant construction.

         2.  Connections and laterals:  Weller's Creek, various locations,
             Upper Des Plaines 20A (73-318-2S).

             This project consists of constructing special diversion structures

             to control and direct flow from existing interceptors and local
                                      1-1

-------
    combined sewer outfalls to the drops  shafts and/or tunnels.

3.  Earth tunnel:   Weller's Creek, Mt.  Prospect Road,  Princeton
    Street and Wolf Road,  Upper Des Plaines 20B (73-319-2S).

    This project consists  of constructing 6,000 linear feet of five-

    foot diameter earth tunnel at a depth of 60 feet;  together with

    manholes and connecting structures.  This sewer will divert

    sanitary sewage flows  in the Upper  Des Plaines 14A system from

    the North Side Plant to the proposed  O'Hare Water  Reclamation

    Plant.

4.  Rock tunnels and drop  shafts:  Weller's Creek and  Feehanville
    Ditch, Lonnquist Boulevard and William Street, Upper Des Plaines
    21 (73-320-2S).

    This project consists  of constructing 11,200 linear feet of

    16-foot diameter deep  rock level tunnel, 2,000 linear feet of

    nine foot diameter deep rock level  tunnel, three drop shafts,

    special diversion structures, access  manholes and  miscellaneous

    and appurtenant construction.

5.  Relief sewer:  Upper Des Plaines 20C  (69-307-2S).

    This project consists  of a five foot  diameter interceptor from a

    junction structure at  Wildwood Road and Oakton Street East along

    Oakton Street for approximately 11,000 linear feet at a depth

    of 40 feet terminating at drop shaft number seven of the Upper Des

    Plaines tunnel conveyance system.  The sanitary sewage will flow to

    the proposed O'Hare Water Reclamation Plant for treatment.

General and Specific Location of the Proposed Actions

     The Upper Des Plaines Basin covers an area of 65.2 square miles

                                 1-2

-------
    (41,760 acres)  in the northwest portion of the Metropolitan Sanitary




    District,  shown in Figures 1-1 and 1-2.  This area is predominantly




    residential in character.  Growth of the area has been spurred by




    several factors.  Among the more significant of these is the proximity




    of O'Hare Airport, the Northwest Tollway, the Tri-State Tollway, and




    the Chicago and Northwestern Railway's tracks which bisect the basin




    in a northwesterly direction.




         The area includes the communities of Arlington Heights, Mount




    Prospect,  Prospect Heights, Wheeling, and a part of the City of Des




    Plaines as well as newer urban developments such as Elk Grove Village,




    Rolling Meadows and Buffalo Grove.  As illustrated in Figure 1-1, the




    boundaries encompass an area which lies generally West of the Des




    Plaines River.   Several major drainage courses traverse the basin in




    a generally East-West direction and empty into the Des Plaines River.




    Two of the waterways are of concern, since they receive combined sewer




    overflows even during low intensity storms.  They are Weller's Creek




    and Feehanville Ditch.  No other waterways within the Upper Des Plaines




    River Basin receive combined  sewer overflows.



D.  Water Quality and Water Quantity Problems in the Area




         1.  Sources of Water Supply in the Service Area




             There are three water supply sources to the service area:




                  a.  Groundwater from shallow glacial-till Silurian




                      aquifer.  The well records indicate that the majority




                      of wells in the shallow aquifer are private domestic




                      service with pumpout rates between 5 to 50 gpm.



                                  1-3

-------
                                                 \

                                     PPER DES PLAINES SERVICE AREA
I
I
                                                                             c>
                                                                                G»
                                                                        hicago
     r' . rs:; liiir'  :&rr
LEGEND


«1 v    M.S.D.G.C. COMBINED-SEWER SERVICE AREA L.
                                                          * f> riVTW?^:.::    ,--! ill    i    T
                                                          ^-«.i!Jr•• '"j-x"!::    '; /\ j-1	1	.J
                                                         ,- v-i.r--.il    •••  ;:i   I     ,


                                                         ^     ^    'I   I     '
                                                         ! !"u*i w--t    '  ;•• f^m _    .,1   I
                                   FIGURE  1-1

             METROPOLITAN SANITARY  DISTRICT OF

         GREATER  CHICAGO  GENERAL SERVICE  AREA


                                      1-4

-------
03  xooa
OD  INVX
                1-5
                                     FIGURE 1-2

-------
                 b.   Groundwater  from the deeper Cambrian-Ordivician




                     aquifer.   The  pumpage  rate in  the  region  of  the




                     project has  reportedly exceeded  the  sustained  yield




                     of the Cambrian-Ordivician aquifer which  has resulted




                     in a decline of  the piezometric  head averaging about




                     10-15 feet/year  in the project area.   The municipal




                     and industrial pumpage appears to  be from the  deep




                     aquifer which  estimated on population,  may have




                     amounted  to  20 to 25 MGD for 1970  in the  project area.




                 c.   Surface water  from Lake Michigan.   It is  anticipated




                     that larger  quantities of Lake Michigan water  will




                     be made available to municipalities  outside  of




                     Chicago in the future  to limit the pumpage rates to




                     the practical  sustained yield  in the project area.




                     Des Plaines  presently  obtains  70 percent,  of  its




                     water from Lake  Michigan through the City of Chicago




                     System.




     For a more detailed discussion of water supply issues, see REGIONAL




WATER SUPPLY REPORT #8, Northeastern  Illinois Planning Commission,




September, 1974.




         2.  Sanitary and Combined  Sewers




                  Approximately 5,000 acres of the  41,760 acres  in  the




             Upper  Des Plaines Basin are  expected  to remain undeveloped




             and unsewered.   This 5,000  acre area consists of  special
                                     1-6

-------
use land such as the Ned Brown Forest Preserve, cemeteries




and the U. S. Military Reservations.  Of the remaining




36,760 acres, 29,438 acres are presently (or will be in




the near future) serviced by separate sanitary and storm




sewers, and 5,952 acres are serviced by combined sewers.




In addition, there are 1,370 acres of separate sewered




areas that connect directly to the combined sewer systems




in such a way that the flows cannot be physically separated




except through extensive and costly construction.  Figure




1-3 illustrates the area contributing combined overflows




to the Upper Des Plaines project.  Those areas indicated




are:  1) the combined sewered area, 2) the separated sewer




area contributing to the project, and 3) the boundaries




of all sewered areas contributing to Weller's Creek and




Feehanville Ditch.  There are about 5,448 acres within the




boundary of the sewered area contributing to Weller's




Creek and Feehanville Ditch that are served by separate




sewer systems.  The storm flows from these areas will



continue to discharge directly into Weller's Creek and




Feehanville Ditch and are not a part of the proposed




project.




     At present all sanitary sewage, and the combined




sewage in the O'Hare Service Area, except for overflows,




is finding its way into Metropolitan Sanitary District




interceptors through regulated control structures, and is




                        1-7

-------
             SEWERED AREA

             CONTRIBUTING

             TO WELLER'S CREEK
                       ONTRIBUTING TO
                      EEEHANVILLE DITCH
                   x*-\   rf  lrf!^')-f.
                   [     L. i  '• :- ' .HU"*
                   s    Sk^t^il*.
                                    SEPARATED AREAS

                                    CONTRIBUTING TO SYSTEM


                                    COMBINED SEWERED AREA
              FIGURE 1-3


COMBINED-SEWER SERVICE AREA


                1-8

-------
             diverted  through  existing  interceptors  to  the MSDGC's

             North  Side  Sewage Treatment  Works  for treatment.

                 During wet weather, flows to  the North Side  Sewage

             Treatment Plant  exceed its design  capacity and  existing

             interceptors overflow to the waterways.  This  frequent dis-

             charge (average:  80 per year) of combined  sewage  to Weller's

             Creek  and Feehanville Ditch  creates an  unsightly, odorous

             condition,  as well as a potential  health hazard.   This un-

             treated sewage then flows  into the Des  Plaines  River.

             Weller's  Creek serves as the main  conveyance facility  for

             the discharge from combined  sewers serving the  watershed.

             Backup in the combined sewers is the primary cause for

             basement  flooding.  Some homes are affected in  this manner

             from almost all  rainfalls  in the watershed.  Combined

             backup will flood approximately 100 basements  for the  5-

             to 10-year storm event.  Street flooding will begin to appear

             for this  same storm event.

                  Overbank flooding does  not occur  until the 25-30-year

             storm event occurs.

                  The water quality standards that  determine the effluent

             parameters for the proposed Wastewater Reclamation Plant

             are found in the WATER POLLUTION REGULATIONS OF ILLINOIS.

E.  Water Quality & Water Quantity Objectives in the Area Other Than
    Solution of Preceding Problems

    The following programs are relevant:

         1.  The Federal Water Pollution Control Act Amendments of  1972

                                    1-9

-------
    (P.L.  92-500)  require:




         a.   Secondary  treatment  of wastes  for municipal




             sewage and best  practicable  treatment  for industrial




             discharges by  July 1, 1977.




         b.   Best  practicable waste  treatment technology  for




             municipal  wastes and best  available  treatment




             for industrial wastes by July  1, 1983.




         c.   All point-sources discharges require a permit




             under the  NPDES  program (National Pollutant




             Discharge  Elimination System). The  NPDES permit




             states the allowable waste loading and flow  volume




             that can be discharged  to  a receiving  stream, lake




             or ocean.




2.  The National Flood  Insurance  Act of 1968 requires the desig-




    nation of flood-prone areas  in  the  United States and  partici-




    pation by the appropriate communities and homeowners  to




    qualify for national flood  insurance protection.  The flood-




    prone areas in the  O'Hare Service Area  have been determined




    for the 100 year storm event  and these  maps,  except for the




    Arlington Heights quadrangle, are available  from the  North-




    eastern Illinois Planning Commission (NIPC).




3.  The Flood Control Activities  planned by MSDGC for the O'Hare




    Service Area are discussed in Appendix  A.




4.  The MSDGC Tunnel and Reservoir Plan (TARP)  for control of




    flood and pollution problems  due to combined sewer discharges




                                  1-10

-------
in the general service area of the MSDGC is described in




Appendix B.  The U.S. Senate Committe on Public Works




(93rd Congress, 1st session) directed the Army Corps of




Engineers to determine the Federal interest in participating




in the TARP program.  Since the Corps viewed any potential




Federal participation to be a significant Federal action,




they determined that part of their response in determining




Federal interest should be the preparation of an Environ-




mental Impact Statement.  Prior to the issuance of a draft




EIS in November 1973, an Environmental Assessment (EA) on




the TARP program was prepared.  USEPA participated in




discussions during the preparation of that EA and made




suggestions with respect to potential environmental impacts




to be addressed.  A public hearing on the TARP EA was held




July 26, 1973 and discussion was presented relating to the




alternative plans presented.  The O'Hare Service Area, since




it contains some combined sewers, was considered in all




alternative TARP plans.  In some TARP alternatives, the O'Hare




service area was sewered by tunnels only, with wastewater




treatment occurring at the MSD North Side STP or WSW  (Stickney)




STP.  Although this alternative was considered, it was not




supported in other engineering studies for the O'Hare Service




Area.  These reports support a WRP for the O'Hare Service




Area and are discussed in Appendix C of this EIS and Chapter 3




of the EIS for the O'Hare Water Reclamation Plant.






                            1-11

-------
USEPA has determined that an independent O'Hare Service Area




is cost-effective and should be separated from the Mainstream




TARP System with respect to building the treatment plant and




conveyance system to it.  This determination is discussed in




Chapter 3.  No final determination has been made with respect




to building a combined sewage overflow reservoir in the O'Hare




Service Area because:




     a.  USEPA is now developing a policy that will address




         the use of construction grants for treatment and




         control of combined sewer overflows and stormwater




         discharges.  This policy will also address flood




         control aspects of such projects and may affect




         the eligibility of USEPA participation in any pro-




         posed reservoir.




     b.  An initial determination has been made that benefits




         derived through construction of the reservoir can




         essentially be classified as flood control, whereas,




         only marginal benefits, in terms of pollution reduction




         would accrue with operation of the reservoir component.




         This determination will be reviewed after the new




         policy is  finalized and at such time as the project




         has priority for funding and is otherwise eligible




         for USEPA  participation.




     c.  Given the  highly speculative nature of possible




         USEPA involvement in the O'Hare Reservoir component,






                      1-12

-------
         we believe it inappropriate to reach any final




         determinations at this time.  The O'Hare Reservoir




         is now being evaluated by USEPA and the Corps of




         Engineers as part of a joint effort in determining




         the level and character of Federal interest in the




         entire Tunnel and Reservoir program.  Once a clear




         division of responsibilities is defined, either




         agency will pursue the eligibility aspects related to




         any possible funding program.  The provisions of the




         National Environmental Policy Act of 1969 would of




         course apply irrespective of which Federal Agency or




         program may be deemed to be the appropriate reviewing




         authority or primarily germane  to those aspects of




         TARP, such as the O'Hare Reservoir, where a clear




         distinction between flood control and pollution




         control benefits must be defined and addressed in




         such a manner that will assure that the limited




         resources available for pollution abatement are not




         committed to flood control projects.




An issue related to the considerations above and the present




delineation of the O'Hare Service Area involves the elimination




of the Palatine leg of the O'Hare conveyance system.  The




analysis prepared by the MSDGC and discussed in Appendix B




is sufficient to demonstrate that possible excessive inflow
                         1-13

-------
    and infiltration exists  in  the Village  of  Palatine  collection




    system.   In other words,  it now  appears more  cost-effective




    to eliminate the sources  of inflow by way  of  sewer  separation




    than to  treat the inflow at the  O'Hare  WRP.   To  confirm this




    initial  analysis, the  Village will be required to perform a




    Sewer System Evaluation  Survey as  described under 40 CFR




    34.927-2.  The Survey  will  definitively demonstrate the




    existence or non-existence  of excessive inflow or infiltration.




    The MSDGC has indicated  that  the present design  of  the O'Hare




    tunnel system will  not forego future options  with respect to




    building the Palatine  leg.  Our  analysis confirms this estimate.




         In conclusion, it is the position  of  USEPA  that the




    proposed projects will function  adequately as a  pollution control




    system without the  construction  of the  proposed  reservoir, and the




    proposed conveyance system will  function as a conventional




    interceptor with the added benefit of decreasing the major




    occurrences of combined overflow.




F.  Costs and Financing




         The project cost for the O'Hare conveyance  system is




    approximately $58.2 million.  This estimate includes the cost




    of all physical elements of tunnels, interceptors,  and




    connecting structures together with a 20 percent factor




    for contingencies.




         Financing of the conveyance facilities portion of the




    project would be through local  and Federal funds.   Twenty-five





                             1-14

-------
    percent, $14.5 million, of the project would be financed




    from an existing $380 million MSDGC bond issue with the




    remaining 75 percent, $43.6 million, from Federal grants.




    The total estimated construction costs for each project




    are as follows:








                   Contract 73-317-2S  - $25,862,513




                   Contract 73-318-2S  - $ 8,922,937




                   Contract 73-319-2S  - $ 2,980,354




                   Contract 73-320-2S  - $16,949,686




                   Contract 69-307-2S  - $ 3,484,510








G.  History of the Application




         Most MSDGC projects, proposed for the O'Hare Service




    Basin have been given a priority ranking of 31 by the Illinois




    Environmental Protection Agency (IEPA).  The infiltration/inflow




    analysis for the service basin was transmitted to the IEPA on



    January 31, 1974.  It has since been revised by the MSDGC and




    is under review by the IEPA.  An informal review is also




    presently under way by this agency.
                            1-15

-------
                        CHAPTER 2

          THE ENVIRONMENT WITHOUT THE PROPOSED ACTION

A.  General

     The Upper DesPlaines Area Service Basin,  under the jurisdiction

of the Metropolitan Sanitary District of Greater Chicago (MSDGC),

is located in Northwest Cook County, Illinois,  within the Chicago

SMSA (Standard Metropolitan Statistical Area).

     The service area is a 65.2 square mile in the northwest

region of the MSDGC's total jurisdiction of 860 square miles within

the County.

     The service area has experienced rapid population growth

during the last 15 years.  The population for  Northeastern Illinois

increased 12.2% from 1960 to 1970.  The following figures

for communities to be served by the proposed water reclamation

plant (WRP) and tunnel system indicate this growth.

Community                     1960         1970        % change

Arlington Heights             27,878       64,884      132.7
Buffalo Grove                  1,492       11,799      690.8
DesPlaines                    34,886       57,239       64.1
Elk Grove                      6,608       21,866      231
Mount Prospect                18,906       34,995       85.1
Prospect Heights               ...       13,333       ...
Rolling Meadows               10,879       19,178       76.3
Wheeling                       7,169       14,746      105.7

(All figures from U.S. Dept. of Commerce,  Bureau of the Census,
publication PC(1)A15-I11.)
                                 2-1

-------
     Figure 1-2 indicates the service area  and  location  of  the

communities.  The service area is predominantly residential in

character.  The 1970 population for  the area was 223,000.   Growth

in the area has been encouraged by several  factors  including the

presence of O'Hare Airport,  Northwest Tollway,  Tri-State Tollway

and the Northwestern Railroad line.   The area is 60%  developed  and

construction of light industrial facilities and residential units

(both single family and multi-family) is ongoing to date.

     The economic condition of the area's population  is  above the

Chicago SMSA median family income of $11,841 and State of  Illinois

Median family income of $10,959.

     1970 census figures indicate the following Median family incomes:

     Arlington Heights                     $17,034
     Buffalo Grove                         $14,833
     DesPlaines                            $14,056
     Elk Grove Village                     $14,155
     Mount Prospect                        $16,503
     Prospect Heights                      $15,992
     Rolling Meadows                       $13,343
     Wheeling                              $13,398

These figures indicate a healthy economic situation within the  service

area.

     Few environmentally sensitive areas are within the  service area.

A small portion of the Cook County Forest Preserve  District's Ned

Brown Preserve of 3,600 acres occupies the  western  portion of the

area.  The Forest Preserve District's holdings  along  the DesPlaines

River are located in the eastern portion of the area.
                                 2-2

-------
B.  Detailed Description




     1.  Climate




     The continental climate of the service area has relatively warm




summers and cold winters, with frequent short fluctuations in




temperature, humidity, cloudiness,  and wind direction.   Temperatures




of 96°F. or greater occur in about half of the summers  while about




half of the winters may have low extremes of -15°F.  The mean annual




temperature is 49 F.  Precipitation averages 33 inches  per year,




with about 10% of this occuring as snow.  Summer rainfall is




unevenly distributed in intense local showers while precipitation




in the fall, winter, and spring tends to be more uniform over large




areas.  Winds are most commonly from the southwest and  the northwest,




on an annual basis.  Tornadoes occur in Northern Illinois and are




most prevalent in March, April, May, and June.  Other periodic hazards




include severe thunderstorms, hail, and ice storms.  Fog is infrequent




in the Chicago area.  Detailed climatological data are  available from




O'Hare International Airport, at the south end of the study area.






2.  Topography




     The service area is 65.2 square miles, sloping from about 700




feet above sea level at the western boundary to about 625 feet above




sea level at the Des Plaines River, 61/2 miles to the  east.
                                2-3

-------
Landfonns are gently rolling,  with slight vertical  relief.  Most




of the study area has undergone the transition from a region  of




small towns and farm land to an extensive suburban  area of  single




family homes, apartments, and commercial and  industrial development.






3.  Geology




     The project area is underlain by three geologic systems.




The stratigraphic sequence is the Quarternary System, the Silurian




System and the Ordovician System. (See Figures 2-1  and 2-2).




     The Quarternary System is composed solely of material  from  the




Pleistocene series.  The formations contained within the series  are




the Wadsworth and Wedron.  The main constituents of both are  clayey




silts with sand lenses orginating from glacial deposits.




     The Silurian System lies under the Quarternary System  and




contains material originating from the Niagaran and Alexandrian




series.  The Niagaran series contains the Racine, Waukesha  and Joliet




formations.  The Racine and Waukesha formations are composed  of




argillaceous fine grained dolomite while the  Joliet formation is a




lighter gray dolomite.  The Kankakee and Edgewood formations  comprise



the Alexandrian Series.  Dolomite is also  the major portion of these




formations ranging from fine to shaly in texture.
                                2-4

-------
System
QUATERNARY
1 SILURIAN
1
ORDOVICIAN
Series
Recent
\
\
Alexandrian
Cincinnatian
i
Formation/Member

WADSWORTH
MEMBER
WEDRON
FORMATION
*-*_*-"— «•!__•<-"" X^^ -T— — — * 	 	


RACINE
(0 -30O')

(WAUK
(O-t
JOLIET
(40-70')
KANK
(2O-


ESHA)
?0')
Romeo
Morkgraf
Brandon
Bridge
AKEE
50')

(EDGEWOOD)
(0-tOO')
NEDA 	
(0-15')
I
C3 BRAINARD
t, SHALE
|j  /




'not
/

N

«•

desert
Description

Till and outwash deposits. Clayey silt with
sand lenses. (Gravel lenses possible but not
probable - described in soils report. )
Bouldery till, clayey silt with sand lenses,
grovel, boulders common near base and at
unconformfty. (Described in soils report.)
Gray-brown, argillaceous, fine grained,
thin bedded dolomite containing Kefs
of pure, gray, massive, vuggy, dolomite.
Gray, fine groined, silty dolomite.
(Generally absent in northern area)
Light gray, pure, porous dolomite.
Light gray, silty, very fine grained dolomite
Red or greenish gray dolomite and
interbedded shale.
Light brown, fine grained dolomite with
prominent wavy clay partings.
Brown to gray sholey dolomite.
( Chert y near top. Not recognifed in
project area.)
— Oolite and red shole^iGenerolly absent )
Oolite and red shale. (Generally absent)
	 Green to brown fossiliferous mudstone
Oed
            FIGURE 2-1
STRATIGRAPHIC SEQUENCE
             2-5

-------
          ROCK    TUNNELS
                               EARTH     TUNNELS
       ifflfSStffR
            Surface
                                      Surfact
                               +6O.
    +52,

   4 SO-
    OVER BURDEN-
       ESTIMATED    PREDOMINANTLY
       PIEZOMETRIC
       HEAD UNDER  CLAYS AND SILTS
       MAXIMUM
       SURCHARGED
       CONDITIONS
                  + 40
RANGE OF PREVAILING
GROUND WATER LEVELS
AT TIME OF SUB-SURFACE
INVESTIGATION
                                                 CONC. LINING
                                                     PROPOSED 5'
                                                     TUNNELS EARTH
                                                                             25
                                                                             50
I
O
O
CD
<
O

X
O
-TOP  OF ROCK
       -LINING-
   ».
  -IOO
                                    INE
                               ROMEO
                   ~HA~R~KGRAF
                               BRANDON
                               BRIDGE
                                •ANKAKEE
                              ^-BRAfNARD
                              -SHALE
                                          TOP OF ROCK
             GENERALIZED  STRATIGRAPHIC  SECTIONS
                                 FIGURE 2-2


                                    2--6
                                                                             00
                                                                125
                                                                             150
                                                                175
                                                                             200

-------
     The final system is the Ordovician,  composed of  the Cincinnation




series which has two formations; the NEDA and Brainard Shale Red




shale and fossiliferous mudstone comprise the majority of these




formations.




     The above discussion emcompases approximately the first eight




hundred feet of earth.  There are two main aquifers contained in




the above mentioned geologic structures.   They lie in the Silurian




and Ordivician Systems.




     The Silurian aquifer has an average  depth of 108 to 205 feet.




It is composed" mainly of glacial till material.  The uppermost




material, in the area of access tunnels and work shafts is slightly




more porous than that surrounding the rock tunnel.  The coefficient




of permeability (C ) of the glacial till  is 10~6 to 10~8 cm/sec.




Because of the low C_ there will be no significant release of water




to the tunnel through seepage.  Any seepage that will occur results




from openings primarily in the form of cracks and joints in the rock.




The location of inflows in this case can  easily be located after




excavation, particularly within the machine bored section of the tunnel




and may be appropriatly grouted.  Another source of inflow may occur




during the boring of work shafts or access tunnels.  The inflow will




originate from ground water seepage, to the upper portions of the
                                 2-7

-------
shaft and tunnels.  This seepage may also be arrested  by the




use of grouting techniques.   Within the formation there exists




sand gravel pockets which hold limited amounts of water.  If




they are encountered by construction,  the water may be released




to the tunnel.  These quantities of water appear to be extremely




limited and are not known to be used as potable water  supply




sources.




     As an overall view it is anticipated that the drawdown of the




water supply aquifier during operation of the facility will be




virtually zero.  It is expected that grouting will reduce the




groundwater flow into the tunnels to less than 300 gpm over the




total length of tunnels based on the results obtained  from previous




projects.  Tunnel lining which is planned, will further reduce




inflows.




     Since the tunneling lies within the glacial till-Silurian




system and concurrently within the Silurian aquifier area, a discussion




of the Ordivician aquifier will be left to the water supply section




of this statement.  Groundwater and surface water recharge of the




aquif ers  will also be addressed in that section.  A more complete




discussion of the bedrock geology can be found in Appendix D.
                                 2-8

-------
4.  Soils




     The soils of the study area have developed from glacial parent




materials, under prairie and transitional (prairie to woodland)




vegetation.  Alluvial soils have developed along stream floodplains.




Most soils generally have fairly  low permeabilities and high




seasonal water tables, resulting in poor drainage.  Despite the




slow drainage erosion control is desirable to avoid soil loss




and the sedimentation of streams.






5.  Hydrology




     a.  Surface Water




     The study area is located in the drainage basin of the DesPlaines




River.  Several small streams originate in the study area and flow




eastward to join the DesPlaines River.  The streams and their drainage




basins have been and are being modified as the area develops. Named




tributaries of the project area include:  Buffalo Creek and Wheeling




Drainage Ditch; McDonald Creek; Weller's Creek and Weller's Drainage




Ditch; Higgins and Willow Creek; and Feehanville Ditch.  All of  these




watercourses have a 7-day once in 10-year low flow of zero.  The




natural drainage boundaries for Weller's Creek and Feehanville Ditch




are indicated in Figure 2-3.
                                  2-9

-------

                  FIGURE 2-3
    NATURAL DRAINAGE BOUNDARIES
WELLER'S CREEK AND FEEHANVILLE DITCH
                     2-10

-------
     Waller's Creek, which has a total length of approximately 6.5




miles, is joined by a number of smaller tributaries and drains an




area of approximately 10,780 acres.  Portions of this stream have




been relocated, some areas have been channelized and other areas




are in underground conduits.  Modifications of dendritic extremities




have been most extensive as many have been eliminated by developments,




and other portions are underground.  The vast majority of this




drainage basin has been urbanized.




     Feehanville Ditch extends for  approximately 2.5 miles and




drains an area of approximately 1,990 acres.  This watercourse




and its drainage basin have been substantially modified by urbani-




zation.  The headwaters of Feehanville Ditch are underground as




is a portion north of Maryville Academy, and a large portion of




the stream has been  channelized.




     Higgins Creek is about five miles in length and drains




approximately 5,000 acres before joining Willow Creek at a point




approximately three to three and a  half miles upstream from the




Des Plaines River.  The majority of the Higgins Creek area is




highly urbanized with some industrial and agricultural uses.




Higgins Creek has been filled, relocated and channelized in




several places.




     The flow rates of Weller's Creek at Golf Road have been




monitored by the United States Geological Survey.   The rates of
                                 2-11

-------
flow are as follows:

                                              Flow (cfs)
                     2 year flood                520
                     5  "     "                  900
                    10  "     "                 1200
                    25  "     "                 1600
                   100  "     "                 2400

No data are available for the smaller drainage basin of Feehanville

Ditch.

     The water quality of Weller's Creek and Feehanville Ditch has

drastically deteriorated with the increasing urbanization of the

respective drainage basins.  Computer model simulation estimated

that during the 21-year period from 1949 to 1969, effluents from

the combined sewers of this area have overflowed into the above

streams 1,660 times discharging a total 140,000 acre-feet of sewage

which had contained 146,000,000 pounds of suspended solids, and

created a BOD (Biological Oxygen Demand) of 20,200,000 pounds.

     The United States Geological Survey estimated the 10, 50, and

100-year flow rate of Higgins Creek at Mount Prospect Road to be

840,1,250, and  1,650 cfs respectively.  The water quality in Hig-

gins Creek is poor and at times below State standards.  Detailed

data can be found in Appendix G.  Existing urban activities con-

tribute polluted stormwater runoff to the natural flow of Higgins

Creek probably adding significant quantities of inorganic and

organic pollutants.

     The Illinois Environmental Protection Agency sampled Weller's

Creek during 1971.  Appendix G compares many parameters
                                  2-12

-------
of water quality with State standards.  The water quality of Weller's




Creek is below State standards for the following parameters; dis-




solved oxygen, total dissolved solids, total phosphate,  ammonia,




phenols and fecal coliforms.  The water quality of Feehanville




Ditch probably approaches the same magnitude of degradation as




presently exists in Weller's Creek.






b.   Groundwater Aquifers in the Service Area




     The Silurian bedrocks of the study area are overlain by 45 to




100 feet of glacial material.  The textural composition of material,




which is often interbedded, ranges from clay to clayed silt, and




usually contains varying amounts of sand, gravel and boulders.




Waterbearing sand layers are common to this glacial deposit.




Analysis of drilling data indicates the water tables of  this areaf




vary from 20 to 25 feet in the summer to around 40 feet in the winter.




     The shallow aquifers of this glacial drift are hydraulically




connected with the underlying Silurian rocks.  Groundwater in the




Silurian and Ordovician rocks occurs in joints, fissures, solution




cavities and other openings.  The water-yielding openings are




irregularly distributed both vertically and horizontally.  Available




geohydrologic data indicate that the rocks contain numerous openings




which extend for considerable distances and are interconnected on




an areal basis.
                                 2-13

-------
     Large quantities of groundwater are withdrawn from wells in




shallow dolomite aquifers of Silurian and Ordovician age in northern




Illinois.  The Niagaran and Alexandrian Series of Silurian age yield




moderate to large quantities of groundwater.




     Most water-yielding openings occur in the upper one-third of the




shallow dolomite aquifers.  A good relationship exists between glacial




drift and the upper part of the shallow dolomite aquifers.   Highest




yielding wells are found in areas where the glacial drift immediately




overlying the shallow dolomite aquifers is composed of sand and




grave.!.




     Probable ranges in yields of shallow dolomite wells can be




estimated from specific-capacity frequency graphs, aquifer thickness




and areal geology maps, and water-level data.   On the basis of these




data, potential wells of the project area could yield up to 40 to 60




gpm (gallons per minute ).




     Recharge of the upper glacial drift-Silurian aquifer appears




to occur from local precipitation, but the low permeability of the




overburden soils may be reason to suspect some horizontal movement




from the west.




     The lower Cambrian Ordovician aquifer reportedly received water




from horizontal movement in recharge areas in North-Central Illinois and




Southern Wisconsin; and vertical leakage through the overlying Maquoketa




formation.  In 1958 this leakage was estimated to be approximately 11
                                   2-14

-------
percent of the total water pumped from deep sandstone wells in the




Chicago region.  The vertical leakage through the Maquoketa shale




is generally due to the large differential head between the aquifers




(and locally may be facilitated by faults in the rock).




     According to Walton (Future Water Declines In Deep Sandstone




Wells in Chicago Region, 111. State Water Survey-Reprint Series




No. 36, 1964) the practical sustained yield of the deep aquifers




in the Chicago region is 60 MGD which is less than the actual pumpage.




It is anticipated that Lake Michigan water may be made available to




municipalities in the future to limit the pumpage rates to the practical




sustained yield in the project area.




     Regionally, the shallow groundwater aquifer system reportedly has




a supply in excess of pumpage and any lowering of the groundwater elevations




is not anticipated except for seasonal fluctuations and local variations




due to pumpage.




     The pumpage rate and the pumpage subdivided by use over the whole




basin from this aquifer has not been established, but available well




records indicate that the majority of wells in the shallow aquifer are




private domestic service with pumpout rates between 5 to 50 GPM.




Municipal and industrial pumpage appears to be from the deep aquifer




which estimated on population, may have amounted to approximately




20 to 25 MGD for 1970, in the project area.  (Average
                                2-15

-------
per capita consumption 115gpd)  of  which approximately  3 MGD  (11%)




infiltrated from the shallow Silurian aquifer.




     Regional groundwater quality  and quantity  data  for Cook,  DuPage,




Lake, McHenry, Kane and Will counties are presented  in Appendix E.




This material is available in Technical Report  #8 -  Regional Water




Supply Report, September 1974,  by  the Northeastern Illinois  Planning




Commission.




     In addition, Water Conaervation measures are described  in the




above mentioned NIPC Technical  Report and are included in Appendix  F.








     c.  Water Quality Management




     Section 208 of the 1972 Federal Water Pollution Control Amendments




Act of 1972 provides for areawide  planning for  waste treatment management




in large urban - industrial areas  of the nation which  have severe and




complex water quality problems. The northeastern Illinois counties of




which the service area is a part have been identified  as  having such




water quality problems.  The Northeastern Illinois Planning Commission




is currently organizing a 208 planning effort with local  governmental




units.  With the support of local  governments,  the Governor of Illinois




may designate an areawide waste treatment management planning  area




(208 area) and may designate the Northeastern Illinois Planning




Commission (NIPC) as the official  "responsible  planning agency" for




208 planning.
                                 2-16

-------
     At this writing, the following service area governmental  units

have supported through resolution,  the designation of  the  six-county

area snd NIPC as the 208 planning agency:

     Arlington Heights
     Mount Prospect
     DesPlaines
     Cook County
     Buffalo Grove


     MSDGC has prepared a proposal as to their participation within

the 208 planning process.

     The Northeastern Illinois Planning Commission has also completed

a Regional Wastewater Plan (1971),  which will be a major component

of the 208 study.

     The Illinois Environmental Protection Agency has  the  responsibility

for Section 303 of the 1972 Amendments whereby water quality problems

are identified and overall pollution abatement strategies  are

established for all major river basins in the state.

     d.  Flood hazards

     The flood-prone areas in the O'Hare service area  have been mapped

for the 100 year recurring flood event.  These maps are available

in 7.5 minute series (topographic)  from the Northeastern Illinois

Planning Commission.  Channelization of Higgins Creek  is part  of the

Willow-Higgins Creek Watershed, plan illustrated in Figure 2-4.   This

plan consists of locating storm reservoirs along Willow-Higgins Creek

and channelizing various sections to protect against the 100-year

flood.  A summary of the O'Hare area flood control activities  is found


                                   2-17

-------
                          FIGURE 2-4
2-18

-------
in Appendix A.

6.  Biology

     Most of the study area has become urbanized, with the original

prairie vegetation and oak-hickory deciduous forest being replaced

by agricultural lands, yards, parks, and urban areas.  Principal

remaining natural areas occur along the Des Plaines River and its

tributary streams, and in the Ned Brown Forest Preserve.  A variety

of birds and small mammals inhabit the service area.  Agricultural

and urban runoff have polluted streams and affected the original

composition of stream plants and animals.

     No endangered or rare species on the United States Department

of Interior list are known to be present in this area.  There are,

however, several rare and endangered bird species from the State of

Illinois list which could be present in the project area.  The rare

species are:

     1.  Nycticorax nyctlcorax - Black-crowned night heron
     2.  Botaurus lentiglnosus - American bittern
     3.  Tyto alba - Barn owl
     4.  Circus cyaneus - Marsh hawk
     5.  Asio otus - Long-eared owl
     6.  Asio flammeus - Short-eared owl
     7.  Hylocichla fuscescens - Veery
     8.  Euphagus cyanocephalus - Brewer's blackbird

The endangered species are:

     1.  Accipiter cooperii - Cooper's hawk
     2.  Buteo linentus - Red-shouldered hawk
     3.  Bantnamia longicauda - Upland sandpiper

7.  Air Quality

     In order to evaluate the existing air quality in the vicinity of the

proposed projects, air quality data was gathered from several sources.  These

included the Illinois Environmental Protection Agency, the Cook County De-

partment of Environmental Control, and an "Airport Vicinity Air Pollution

                                2-19

-------
Study" conducted by the Energy and Environmental Systems Division of


Argonne National Laboratory.


a.  Particulate Matter


     The greatest amount of data available is the result of particulate


matter sampling.  Data from the Argonne study indicate that for

                                                         o
sampling stations west of Q'Hare levels vary from 46 jig/m  in upwind
conditions to 66 /ig/m  for downwind conditions.  On the other hand,


levels at stations east of O'Hare vary from 112 /ig/m^ in upwind


conditions, to 66 ^ig/m^ in downwind conditions.  The increase in


particulate values when winds are from the west suggests that the


airport does make a measurable contribution to the particulate loading


downwind of the airport.


     The primary national ambient air quality standard is an annual average

                       o                                                *%
no greater than 15 /ig/m  and a 24-hour maximum no greater than 260 /ig/m .


Samples taken on airport property show that 100% of the 24-hour values


were 240 jig/m  or less while 100% of the 24-hour samples outside the


airport were ISOyag/m-* or less.


     At a Cook County sampling station southeast of O'Hare  (Franklin      «


Park) the annual mean concentration of particulate matter in 1974 was


74/ig/m3.  At another station northwest of O'Hare (and downwind), the


annual mean concentration for 1974 was 67/ig/nH.  While both of these


stations met the primary standard for particulate matter, they were


in violation of the secondary standard of 60 ^ig/m .  Data from a


City of Chicago sampling station east of O'Hare (Taft High  School)
                                 2-20

-------
from January, 1966 to December, 1974 shows an average annual mean


concentration of 89yig/m3.   Obviously, it is very difficult to draw


any conclusions from this data because of the variability of wind


direction and the effects of surrounding area emissions.  It does


appear however, that samples taken close to airport sources generally


violate standards, but that the concentrations of particulate matter


decrease with increasing distance from the airport.


     b.  Nitrogen Oxides


     Because there is even less data available on this pollutant, it


becomes even more difficult to note any significant trends.  National


ambient air quality standards state that, as an annual average,

                                                 Q
photochemical oxidants should not exceed 160 /ig/mj nor should they


exceed 0.08 ppm as a one-hour maximum.  While some samples taken during


the Argonne study recorded levels as high as 540 /ig/m3 (or 0.262ppm),


the variability in samples was extensive with some readings as low as


2.4yug/m3.  For example, samples taken along the northern perimeter

                                  3            3
of the airport range from 220 jag/m  to 540 /ig/m  .  Along the eastern

                                                   o            3
perimeter of the airport values ranged from 52 /ig/m  to 187 /ig/m .


Comparisons of samples on airport property and those outside O'Hare

                       o                            3
show levels of 209/ig/m° for the former and 109 jug/m  for the latter.


     Results of samples taken by Cook County show an annual 1974 mean of


65^ig/m  with a range from 32/ig/m3 to 110/ig/m3.  Similar samples


taken by the City of Chicago east of O'Hare (Taft High School)
                                 2-21

-------
indicate a 1974 annual average of 0.036 ppm.  The Argonne study concluded


that concentrations of NO and NOX were substantially higher in active


mobile source areas of the airport than in the surrounding neighborhood.


The highest NOV readings were obtained at both the gate areas and near
              X

the ends of runways 14R and 14L.  As with particulate matter, it can be


seen that monitoring over a long period of time results in annual averages


which are well within the standards.  However, it is very common that


in certain areas, spot samples will result in readings which greatly


exceed the hourly standard.


     c.  Total Hydrocarbons


     In the case of this pollutant it was found that the background levels


of total hydrocarbons (TCH) were so high that it was not possible, in the


case of the Argonne study, to determine the impact of aircraft emissions


on the air quality in the area.  The maximum standard for a 3-hour period,


which is not to be exceeded more than once a year, is 160 /ig/m^ (or 0.24 ppm).


Sampling of the northern perimeter revealed THC levels from 1934
            o                            o             o
to 2330 /ig/m  with a range from 1700/ig/m  to 1950 /ig/m  along the eastern


perimeter.  THC levels outside O'Hare in Elk Grove Village (west of Site #1)

                     0             O
ranged from 1535 >ig/mj to 2100 /ig/m.  The Argonne study noted that the high


background THC could be largely methane which is relatively stable in the


atmosphere while the contributions coming from aircraft may contain a


substantial fraction of reactive hydrocarbons so that these contributions


could be significant with regard to the production of photochemical smog.
                                  2-22

-------
     The Argonne study indicated that it was highly questionable whether




aircraft emissions would have a detectable effect at ground level




because of the interference with ground based emissions.  Visual




observations of the exhaust plumes saw them transported to ground level




at distances of about one to two miles from the runway end.  The visibility




of the exhaust plumes near the surface within one or two miles of the




airport as well as their detectability at flight levels suggest that at




least one type of impact of particulate emissions is to increase the




atmospheric pall in the airport vicinity.




     In general, it appears that air quality in the vicinity of the




project sites is severely degraded because of the proximity to O'Hare




airport.  While comprehensive sampling indicates that the standards for




some pollutants are not violated, spot sampling would certainly indicate




a noticeable degradation of the air quality in the area.



8.  Land Use




     Figure 2-5 indicates various land uses in the area of the proposed




interceptor.  The Northern Illinois Planning Commission (NIPC) has




identified by 24 categories,  the acreage of actual land use as of 1970.




The following table indicates the land uses of the quarter-sections




through which the interceptors are proposed:
                                2-23

-------
                                        •
T42N RUE
             •I!
         ™ j. «, »^«« •'.<**.v£
                                              WATER R^LAMAtlON

                                                        VNT
                                           T41N RUE
                                                                                29
                                                           T41N R12E
     EARTH TUNNEL


     DROP SHAFT
                           ;i;i;i;t;i;i;i;i;i;i; COMMERCIAL/ OFFICE
                          ;;;:;;;:;;;;;;;; INDUSTRIAL AND
                                 POWER LINE
    fSi PARK LAND/ SCHOOL         RIGHT-OF-WAY

SSSSHSS RESIDENTIAL
                         Sife«H^ UNDEVELOPED


                                    FIGURE 2-5
                                  LAND USE
                                                          2-24

-------
NIPC Category //	Land Use Type	Acreage
1
2
3
4
5

6
8
9
10
11
16

18
19
21
22
23
24
Residential-Single Family 1430.4 acres
Residential-Multi Family 82.8
Residential-Mobile Homes 11.8
Manuf acturing-except wholesale 334.1
Transportation, Communications, 55.7
Utilities
Railroad right-of-way 21.2
Streets 606.6
Trade 123.5
Services-Private 6.9
Services-Institutional 103.9
Public & quasi-public 171.7
open space
Vacant-agriculture, forest 1218.9
Vacant-under development 39.7
Warehousing-storage 16.6
Shopping centers 18.7
Hotels, Motels 6.0
Parking independent 3.3
     The above table indicates that the predominant existing land use

categories are single family residential,  streets and vacant.

     According to MSDGC estimates, the ultimate growth of the facility

area will include:

     Residential & commercial land uses -  29,382 Acres
     Industrial                            7,378 Acres
     Open Space (includes forest           5,000 Acres
                 preserve, cemeteries &
                 municipal parks)

The growth trends have shown vacant land developed to residential,

commercial and industrial uses.  Residential growth trends indicate

multifamily residential units becoming more prevalent than the past

predominantly single-family home suburban-type development.
                                2-25

-------
     Air and water quality may be threatened by the trend  in land




use changes which include more people,  cars, and construction of  homes,




offices, industrial plants and shopping centers.  The availability of




vacant land is not the only criteria for future development.   Several




open space agencies exist within the service area (for example local




Park Districts) which are authorized to acquire lands for  park and




recreation purposes.  These agencies contribute to the overall environ-




mental improvement by preserving lands  for recreational and environmental




educational uses.  The trend toward open space preservation should be




included in land use alternatives considered in the various plans




prepared by local agencies.




     Comprehensive planning is the process by which a public planning




agency provides for orderly development of an area and promotes a




desirable environment.  By this process, physical development is




coordinated in accordance with present  and future needs.




     Plans and programs usually include a land use plan, a thoroughfare




plan, a common facilities plan and public improvements program.




Administrative and regulative measures  to control and guide physical




development according to the plans include a zoning ordinance, an




official map and subdivision regulations.




     A land use plan shows the location and extent of lands designated




for various kinds of residential, institutional, commercial, industrial




and public purposes.  Current land use  planning within the service area




is being carried on by a variety of governmental units.
                                  2-26

-------
     The "Summary of Local Planning Documents  in Illinois," prepared by

the State of Illinois Department of Transportation (1973), lists the

following plans:

     Arlington Heights        Comprehensive Village Plan  (revised  1967)
                              Preliminary Planning Report 1968
     DesPlaines               Comprehensive Plan 1971, Zoning Ordinance
                              1971
     Elk Grove Village        Comprehensive Plan,  1967
     Mount Prospect           Comprehensive Plan,  1968
     Rolling Meadows          Subdivision Control  Ordinance (amended 1964)
     Wheeling                 General Development  Plan, 1965

     The Cook County Zoning Board of Appeals is currently preparing a

new zoning map and zoning ordinance.  Additionally, the county has a

traffic safety study in progress.

9.   Sensitive Areas

     No properties included in or eligible for inclusion in the National

Register of Historic Places are in the area of the tunnel system.  No

rare or endangered species, from either State  of National lists, are

known to occur in this area.  The major open space area is the Ned Brown

Forest Preserve.  It is important both as a biological and recreational

resource.  Tunnels will be constructed under parkland in Des Plaines and

Mount Prospect.  About 1.4 acres of parkland would be affected by  con-

struction of the dropshafts and access manholes.

10.  Population Projections and Economic Forecasts

     The projected population forecast of the  Northeastern Illinois Planning

Commission (NIPC) is shown in graphical form in Figure 2-6, and in Table

2-2.  The present population in the O'Hare Service Area is approximately

250,000.  The projected population for the design  year of 2000 is  300,000.


                                2-27

-------
   POPULATION FORECAST

   O'HARE FACILITY AREA
c
03
CO

O

K

c

c
O
'•*-•
JO
13
Q.
O
Q.
400
350
300
250
200
150
100
 50
  1960    1970    1980    1990    2000

                     Years
                                    2010
2020
2030
                   FIGURE  2-6



                     2-28

-------
Table 2-2.  Population forecasts for the O'Hare Service  Area.
(Source:  Northeastern Illinois Planning Commission)
        YEAR	Forecast Population

        1976                          223,000
        1980                          261,000
        1990                          277,000
        2000                          300,000
     Economic forecasts available are limited to projections of employment

by townships prepared by NIPC.  The three townships principally in the

O'Hare Service Area are Elk Grove, Maine and Wheeling.   The employment

forecasts for these townships are shown in Table 2-3.
Table 2-3.  Employment forecasts for the O'Hare Service Area
(Source:  Northeastern Illinois Planning Commission)
Township
Elk Grove
Maine
Wheeling
TOTAL
1970
37,257
52,767
24,916
114,940
1980
43,400
68,600
31,200
143,200
1990
46,300
74,300
34,300
154,900
2000
47,100
75,800
34,700
157,600
11.  Other Programs in the Area

     New federal legislation entitled the "Housing & Community

Development Act of 1974" provides the possibility of funding  for

community development activities.  Within the service area, two
                                2-29

-------
communities, Arlington Heights and DesPlaines  have  populations  greater




than 50,000 and thus are eligible for their own "entitlement", moneys.




Cook County would be eligible for funds as an  "Urban County"  under




this act.  Sewer construction is one eligible  activity under  the




program.  Future growth capacity could be stimulated by this  federal




program and ultimately serviced by the MSDGC.
                             2-30

-------
                                 CHAPTER 3




                       CONVEYANCE SYSTEM ALTERNATIVES






A.  Project Objectives




    1.  The elimination of combined sewer overflows into Weller's Creek




        and Feehanville Ditch.




    2.  The conveyance of wastewater generated within the Upper Des Flaines




        Drainage Basin to the proposed Water Reclamation Plant (WRP)




        located in the service area.




    3.  The minimization of the environmental impacts of construction on the




        extensively developed residential areas in the Upper Des Plaines




        Drainage Basin.






B.  Constraints




         There were three principal constraints on the selection and design




    of alternative systems:




    1.  The Weller's Creek and Feehanville Ditch Drainage Basins are




        extensively developed, primarily in residential uses sensitive to




        disruption.




    2.  The 29 outfalls in the study area will be, by December 1977, in




        violation of the Illinois Environmental Protection Agency (IEPA)




        water pollution regulations adopted by the Illinois Pollution Control




        Board in July 1973 and approved by USEPA.




    3.  For the project to be economically feasible, routings between a




        treatment plant and the overflow points should be as direct as




        possible.
                                     3-1

-------
                                 J-  1...J.      \
                                -HJPPER DES PLAINES SERVICE AREA

     ~!—i H,, ,    C,   'V1--' ,  r-r1" f ;   i  J


     rfJ._ .i.     (  "  '"i,..j' "      !L i-^v'A
LEGEND
       M.S.D.G.C. COMBINED-SEWER SERVICE AREA I	'.'
                                 !ibusu^===i=i:|r    j-|f    |ynI::  lU-j^1

                                  A        d    l-J^C^iE::   "7W|
                                  •'         |i!i!P;;n::   r-S?D-J '"5;v-!i!    'lyiiil	
                                     ^,     sfS;;;   "| ..Ig^SSfi     I |)     i^j
                                 FIGURE 3-1

           METROPOLITAN SANITARY  DISTRICT OF

        GREATER  CHICAGO  GENERAL  SERVICE AREA

                                    3-2

-------
C.  Chronology of Plans and Studies




        The Metropolitan Sanitary District of Greater Chicago is divided




    into eight service basins.  Of particular interest in this statement




    is the Upper Des Plaines Drainage Basin,delineated in Figure 3-1.




    Collection and treatment of sewage generated in the Upper Des Plaines




    Basin has been the subject of many studies and reports.  Based on a




    report by Greeley and Hansen submitted in 1962, a tentative decision




    was made to convey all sewage from the area to the West-Southwest




    treatment works at Stickney.  Following the Greeley and Hansen 1962




    report, additional studies and investigations, carried out primarily




    because of the trend toward higher standards for disposal of treated




    effluent, have indicated the advisability of collecting and treating




    the sewage from each drainage area separately.  The policy of separa-




    tion of drainage areas has been adopted by the MSDGC and four treatment




    works are planned for the Northwest Area.  The four systems have been




    designated as O'Hare (Upper Des Plaines), Salt Creek, Hanover Park and




    Poplar Creek.




        A preliminary design concept for the O'Hare Water Reclamation Plant,




    and an estimate of cost of both the intercepting sewers and the recla-




    mation facilities was prepared in report form for the MSDGC by Brown and




    Caldwell, Consulting Engineers, dated June 1968.  Preliminary plans for




    the intercepting sewers were prepared by De Leuw, Gather & Company,




    Consulting Engineers, in accordance with an agreement between that firm




    and the MSDGC.
                                   3-3

-------
D.  Alternatives



         There are three basic alternatives to the wastewater management



    problem within the Upper Des Plaines Drainage Basin.   Given the need to




    provide additional treatment capacity, and the laws governing the dis-



    charge of combined sewage into surface waterways,  there are:   1) Sewer



    separation, 2) Conventional interceptors, and 3)  Interception and



    conveyance of combined sewage.  Certain of these  alternatives can be




    combined; in addition, the basin alternatives themselves have



    sub-alternatives within the context of their own  plan.



    1.  Sewer Separation — This alternative consists of the elimination of



        the combined sewer system throughout the Villages of Arlington Heights



        and Mount Prospect, and the City of Des Plaines.
        Engineering and cost analyses have not been made f^r the Upper Des Plaines




        Basin for this alternative: however, preliminarv engineering Analyses



        were made for Palatine, Illinois, a neighboring community of similar




        character.  In the latter instance, two methods were investigated:




        construction of a new sanitary sewer in every street within the




        combined area and conversion  of the existing combined sewer to a




        storm sewer; or, construction of new storm sewers and conversion of




        the existing facility to a sanitary sewer.  In practice, there




        would be some waste in either method, since the existing sewers are




        generally larger than required by sanitary flows, and not large




        enough to accommodate storm flows of the magnitude required to




        eliminate flooding.  Perhaps a more efficient solution may be




        conversion  of the larger existing facilities to storm sewers and the




        smaller sewers to sanitary sewers .




                                        3-4

-------
    The alternative would involve construction within every block of




    every street.  Construction within any given block length would



    probably require several weeks, excluding construction time for the



    replacement of permanent pavement.  Such a program could extend




    over a period of several years, depending upon the magnitude of the



    area the municipality chose to impact at one time.






2.  Conventional Intercepting Sewer— Two conventional systems were




    examined:



    a.  A system of conduits which would intercept the existing MSDGC



        intercepting sewers within the Upper Des Plaines Basin and



        direct the sanitary flows to the proposed Water Reclamation



        Plant.  Two subaltematives were developed which differ only



        in alignment.  The least costly scheme would have a total




        project cost of approximately $24.2 million (1972 dollars).



    b.  Conventional intercepting sewers, together with sewer




        separation.






3.  Collection and Conveyance of Combined Overflows — This alternative



    consists of collecting overflows from the existing outfalls, and



    conveying combined sewage to the proposed Water Reclamation Plant



    for treatment prior to discharge to the waterway.  The system would



    consist of large diameter rock tunnels, together with necessary



    appurtenant structures to connect the existing combined outfalls and



    redirect the combined overflows to the rock tunnel system.
                                 3-5

-------
    4.  A no action alternative was also considered for purpose of evaluation.

        This alternative consists of simply doing nothing with regard to

        combined sewer overflows into Weller's Creek and Feehanville Ditch

        or diversion of flows to the proposed O'Hare  Water Reclamation

        Plant.  Impacts on water quality of Weller's Creek as a result of no

        action are discussed in Chapters 2 and 5.  All sanitary sewage

        generated within the basin would continue to flow thru interceptors

        to North Side Sewage Treatment Works.


E.  Comparative Analysis of Alternatives

        To evaluate the various options available for wastewater management

    within the Upper Des Plaines Basin, six alternatives were assessed in

    relation to project objectives (See Table 3-1).


	Table 3-1  Comparison of Alternatives and Project Objectives	

                                     	Project Objective	
                                     Eliminate   Conveyance   Minimize Environ-
                                     Combined        to       mental Impacts
       Alternative No.               Overflows     Plant      of Construction


  1.   Sewer Separation                yes           no             no

  2A.  Conventional                    no            yes            yes
       Interceptors

  2B.  Separation with                 yes           yes            no

  3A.  Collection and
       Conveyance of                  *yes           yes            yes
       Combined Overflows

  3B.  Collection, Conveyance
       and Storage of Combined         yes           yes            yes
       Overflows

  4.   No Action                       no            no             yes
* Partial
                                    3-6

-------
    Two alternatives—separation with interceptors (Alt.  2B) and collection,
    conveyance and storage (Alt. 3B) would meet the first two project
    objectives.  In addition, the collection/conveyance alternative (Alt.  3A)
    would meet the second objective and greatly reduce overflows.  This
    alternative partially meets objective one and would result in a 72 percent
    reduction in total volume of spills, a 93 percent reduction in number of
    spills and a reduction in the number of average yearly spills from
    approximately 80 to six.

        In the selection of alternatives for further screening, only those
    which were at least in part responsive to project objectives were
    carried forward.

F.  Final Systems Screening
        Three alternatives were selected for more detailed analysis.  These
    were:

    *   Separation with interceptors.
    *   Collection and conveyance of combined overflows.
    *   Collection, conveyance and storage of combined overflows.  The
        proposed Water Reclamation Plant is designed to handle peak dry
        weather flows only and not the peak wet weather flows from combined
        sewer areas.  MSDGC plants are normally operated at full capacity
        before and after storms to minimize the overflows of untreated flow.
        It is not cost-effective or feasible to increase the plant peaking
        capacity to match the rate of storm runoff, which for the 11.4
        square mile combined  sewer area may reach over 30 times the dry
        weather flow for the  entire 65.2 square mile basin.
                                    3-7

-------
1.  Separation with Interceptors Alternative

        Of the 7,322 acres of combined area in the Upper Des  Plaines

    Basin, 1,370 have separate local sewer systems, which are recombined

    at the dowstream end with the combined system,  leaving 5,952 acres

    which would require new separated sewer systems.  The

    analysis of Palatine, Illinois indicates  that  the cost of a new
                X
    separate sanitary sewer system would be approximately $12,700 per

    acre.  For the O'Hare Service Area this results in  an estimated

    separation cost of $75.6 million.  In addition, if  separation were

    accomplished,  conventional interceptors would  still need  to be

    constructed at an estimated cost of $23.2 million for a total system

    cost of $98.8 million.

        While this alternative would achieve  the objective of elimination

    of combined sewer overflows, it would have other  severe environmental

    implications.   The amount of surface disturbance  necessary would be

    extensive.  Even with considerable construction safeguards, there

    would still be a significant quantity of  erosion  and runoff due to

    the construction and separation of the sewer systems.  In addition,

    the quantity of material resources necessary for  this alternative

    would be significant.



 2.  Collection, Conveyance and  Storage of Combined Overflows Alternative

         A detailed engineering  analysis was made of  tunnel and  reservoir

    alternatives.  A report  titled "Preliminary Plans  for O'Hare  Collection

    Facility," dated November 1972,  presents a summary  of this  analysis

    and  tunnel and reservoir concept plans.  The estimate for  the preferred
                                  3-8

-------
tunnel and reservoir scheme selected for the total basin is $88.5




million.  This figure is established from Chapter XI, of the De Leuw,




Gather report by adding the estimated land cost to the estimated




construction cost (including 20 percent for contingencies) and




deducting the $18.8 million estimated cost of the Palatine area




projects.  (Palatine area projects are no longer planned to be




interconnected to the O'Hare Tunnel Conveyance System).




     It has been estimated that the average yearly volume of combined




sewage intercepted by the tunnels and reservoir would be 6670 acre-feet.




This is equivalent to a runoff of approximately eleven inches over




entire combined sewer area in the basin.  This 6670 acre-feet is




equivalent to a yearly volume of 2.17 billion gallons or 5.95 MGD




average additional flow to the plant.




     Therefore, a cost comparison for separation versus a tunnel and




reservoir concept project is as follows:




                                    Sewer Separation




     Capital Cost                      $98.80 Million




                                    Tunnel and Reservoir Scheme




     Capital Cost                      $88.5 Million




     Treatment Cost                      5.3 Million




                        Total Cost     $93.8 Million




     It is noted that while this estimate favors the tunnel and reservoir




plan by $5 million,  the following factors should be considered:




     a.  The maintenance and operation cost estimated at $155/MGD is
                                   3-9

-------
            very conservative for combined sewage treatment.   It  is  based




            on the MSDGC surcharge ordinance which relates  to  the treatment




            of sanitary sewage and industrial wastes.




        b.  The assumption of a 50-year maintenance and operation cost




            is conservative.



        c.  The cost of inconvenience to the public by  excavation in




            every street in the combined sewered  area,  as would be




            required in the sewer separation alternative, is not  reflected




            in the cost comparison.




        d.  The cost of required replumbing for buildings in the  combined




            sewered area is not included in the $12,700 per acre  cost used




            for sewer separation.




        e.  The monetary value of pollution reduction by the treatment of




            polluted urban runoff is not reflected in the cost comparison.






3.  Collection and Conveyance of Combined Overflows Alternative




        The MSDGC has opted not to construct the  reservoir  portion of the




    tunnel and reservoir plan at this time. Such a decision results in




    a system of rock tunnels identical in structure to  those of the tunnel




    and reservoir plan.  This option is referred  to as  the  Rock Tunnel




    Alternative.  All flow characteristics, connections, locations and




    sizes would remain the same as those under  the tunnel and  reservoir




    plan, but the storage volume would be reduced to that of the  volume




    of the tunnels.




        The completed Rock Tunnel Alternative system will provide approxi-




    mately 200 acre-feet of storage for combined  sewage capture.   This
                                3-10

-------
is sufficient volume to contain approximately 1/3 inch of runoff




from the entire 7322 - acre combined sewer area.  Using a combined




runoff factor of 45 percent, this is equivalent to the runoff from




a 3/4 inch rainfall over the Upper Des Plaines combined sewer area.




     Computer model studies indicate that approximately 72 percent




of the volume of all combined sewer discharges to Weller's Creek and




Feehanville Ditch would no longer occur on completion of the tunnel




system.  This would reduce the biochemical oxygen demand (BOD) and




suspended solids discharged by approximately 92 percent and 93




percent, respectively.  Cost of a system of collection and conveyance




rock tunnels including all appurtenant structures to provide an




operating facility is estimated to be $58.2 million.




     The Rock Tunnel Alternative is described in greater detail in




Chapter 4 and assessed in Chapter 5 for comparative purposes with the




no action alternative.
                               3-11

-------
                          CHAPTER  4







              DESCRIPTION OF THE PROPOSED ACTION






     The proposed action consists of a network of tunnels and shafts ranging




in diameter from 5 to 20 feet.  A majority of the tunnels (6.63 miles) would




be located approximately 160 feet below the ground surface in rock.  The




remaining 3.22 miles of earth tunnel would be at depths approximately 40 feet




below the surface.  See Figure 4-1.




     This network is designed to collect all combined sewer overflows within




the project area and direct them together with sanitary flows, to the




south end of the tunnel system.  A description of each contract of the proposed




project is given in Chapter 1.  All earth tunnels will be lined with 12 inches




of concrete and all rock tunnels with 10 inches of concrete.




A.  Main Tunnel




     The main rock tunnel would be 20 feet in diameter and run north along




Elmhurst Road from a main shaft located approximately 400 feet southwest of




the intersection of Elmhurst Road and Northwest Tollway to Drop Shaft 4.  From




Drop Shaft 4 the main tunnel would proceed northwest along Weller's Creek




to Drop Shaft 1 located approximately 400 feet north of the intersection of




Central Road and Weller's Creek.




B.  Branch Tunnels




     The east branch tunnel would be 16 feet in diameter.  It would begin




at a junction with the main rock tunnel at the intersection of Elmhurst Road




and Lonnquist Boulevard, and proceed east in Lonnquist Boulevard to Drop




Shaft 6 at Williams Street,  then turn north and follow Williams Street to




Drop Shaft 8 located approximately 200 feet northeast of the intersection
                                   4-1

-------
• ••• BOCK TUNNEL
       (APPROXIMATELY ISO FEET BELOW SURFACE)
III	Ill EARTH TUNNEL
       (APPROXIMATELY 60 FEET BELOW SURFACE)
  A  DROP SHAFT
M
                                           FIGURE 4-1
                         ROCK  TUNNEL ALTERNATIVE
                                             4-2

-------
of Isabella Street and Rand Road.  A nine-foot rock tunnel would junction




with the east branch at Lonnquist Boulevard and Williams Street, and proceed




east along Weller's Creek to Crop Shaft 5 located at Weller's Creek and




Mt. Prospect Road.




     A five-foot earth tunnel, to be lined with concrete, would begin at




Drop Shaft 5 and proceed north on Mt. Prospect Road to Princeton Street,




then east in Princeton to Wolf Road and north in Wolf Road to intersection




of Rand Road and Wolf Road.




     Beginning at Drop Shaft 7 a five-foot concrete-lined earth tunnel




would extend west under Oakton Street approximately 2.08 miles to the




intersection of Oakton Street and Wildwood Road.




C.  Sequencing of Tunnel Construction




     It is anticipated that construction of the 4 tunnel contracts will




commence on approximately the same date.  The connection and laterals




contract, U.D. 20A (Contract 73-318-2S) is expected to be awarded approximately




one year later.




     Tunnels are generally excavated in an upgrade direction since this




facilitates dewatering and muck removal.  However, for the rock tunnel




project it is anticipated that spoil removal, specified shaft location and




the magnitude of the projects will be a more important consideration.




1.  U.D. 20 (Contract 73-317-2S)




     Tunnelling will commence at the main shaft at the southwest corner of




the Northwest Tollway and Elmhurst Road and proceed northerly and westerly




to the site of Drop Shaft No. 1 located at Central Road east of Busse Road
                                4-3

-------
2. U.D. 21 (Contract 73-320-2S)




     Tunnelling for the 16 foot diameter tunnel will commence at the site




of Drop Shaft 8 at Rank Road and Isabella Street and proceed, reverse grade,




southerly and westerly to a junction with U.D.  20 at Elmhurst Road and




Lonnquist Boulevard.




     Tunnelling for the 9 foot diameter tunnel  will commence at the location




of Drop Shaft No. 5 at Mt. Prospect Road and Lonnquist Boulevard extended




and extend westerly to the junction with the 16' diameter tunnel at Lonnquist




Boulevard and Williams Street.




3.  U.D. 20B (Contract 73-319-2S)




     Tunnelling will commence at Lonnquist Boulevard (extended) and Mt.




Prospect Road and proceed northerly and easterly to Wolf and Rand Roads.




4.  U.D. 20C (Contract 69-307-2S)




     Tunnelling will commence at the location of Drop Shaft 7 at Elmhurst




Road and Oakton Street and proceed westerly to  Oakton Street and Wildwood




Road.




     The tunnel water detention basin required  for U.D. 20 will be located




immediately west of the main shaft.  Water infiltrating into the tunnels will




drain by gravity to the low point in the tunnel system at the location of the




junction with the 7-foot diameter plant influent tunnel.  From this point it




will be pumped out through the main shaft to the detention basin which will




be pumped or drained by gravity to Higgins Creek immediately west of the




site of the nftin shaft.
                                 4-4

-------
     Excavated material will be removed from the tunnels at main shaft




sites.  Transportation in the tunnels will be by muck cars traveling on




rail tracks laid in the tunnels.  The material will be removed from the




tunnels by a crane or elevator hoisting system.  It will then be deposited




near the shaft at a temporary storage location or hauled immediately




from the site to its ultimate user.  Market conditions and available storage




space will dictate the amount and time of storage.  The MSDGC owns




approximately 112.5 acres adjacent to the main shaft, part of which will




be made available for spoil storage.




     The material excavated will be composed of spalled or laterally split




rock of small dimensions with a large percentage of fines.  As this




material does not have a gradation conforming to accepted specifications




for concrete aggregate or roadway base material, it is not generally




acceptable for these purposes.  However it has been used in private




developments for such things as stone base for parking lots.  The primary




use of this material is expected to be as land fill.




D.  Main Shaft and Drop Shafts




     The main shaft is the location for lowering and removing the mining




machines.  Men, equipment and material will enter and exit from the tunnel




system from this shaft during construction.  Dewatering during construction




will take place at this location.




     After construction, the main shaft will serve as part of the exit




structure from the tunnel system should a reservoir eventually be constructed




at  its  terminus.  The main  shaft is  in  fact  located  on  the  proposed  site




for a main  reservoir which  was  proposed by DeLeuw,  Gather and  Company  in




the preliminary plans.  After construction the main  shaft,  having  a  finished




                                 4-5

-------
internal diameter of 16 feet, will be capable of being used for lowering a

maintenance vehicle into the tunnel system.

     A drop pipe will be provided at the Main Shaft to extend service to

the portion of the service basin area south of the Tollway.


                              Drop Shafts


Shaft Number                       Location

     1                    Approximately 400 feet north of the inter-
                          section of Central Road and Weller's Creek.

     2                    At the intersection of Weller's Creek and
                          Lincoln Street.

     3                    Within the park along Weller's Creek
                          approximately opposite Wa-Pella Avenue.

     4                    At the intersection of Weller's Creek
                          and Elmhurst Road.

     5                    At the intersection of Weller's Creek
                          and Mt. Prospect Road.

     6                    At the intersection of Williams Street
                          and Lonnquist Boulevard.

     7                    At the intersection of Elmhurst Road
                          and Oakton Street.

     8                    Approximately 200 feet northeast of the
                          intersection of Isabella Street and
                          Rand Road.

     The shafts would require excavation approximately 160 feet deep into

the overburden soils and rock.  These excavations would require temporary

sheeting and bracing to support the adjacent earth until the permanent

structures are constructed and backfill work is completed.  Blasting would

be required for excavation of the rock portions.  This blasting would

continue for approximately one month at each shaft and be limited  to one

                                  4-6

-------
blast every two or three days.  During the construction of the shafts




the work areas would be fenced and secured in accordance with MSDGC




standard practices.  The shafts would vary in size from five to nine




feet in internal diameter.  Construction would proceed from the surface




downward to the tunnel level.




     A sectional view of the Type D-4 drop shaft to be used in the Upper




Des Plaines Tunnel Conveyance System is shown in Figure 4-2.  It is noted




that the air insufflated into the water on its way down the shaft in




the downcomer is released in the separation chamber.  This air rises




in the vent shaft and becomes reinsufflated into the incoming sewage




at the top of the downcomer.  There is, therefore, no net movement




of air out of the drop shafts.  During model studies the vent shaft




openings to the atmosphere at the top of the structures were sealed during




some of the experiments, thereby precluding the possibility of air movement




out of the shafts.  This did not affect operation of the drop shaft.




     While the aspect of aerosol release at the top of the vent shaft or




downcomer was not specifically studied in the model study program, MSDGC




observed that this phenomenon did not appear to be occurring.  In the




event that the prototype drop shaft does operate differently from the




models and the phenomenon of air movement out of the shafts does occur




the openings to the surface of the ground could be sealed without hydraulicall




affecting the structures.




     Sluice gates will be placed in collection structures at the location




of all major sources of storm water inflow into the tunnel system.  These




gates will be provided with an alternate power supply or other means to




insure their operation when required.  The gate status will be continuously






                                    4-7

-------
           DROPSHAFT   D-4   TYPE
        UPPER  DES  PLAINES  TUNNEL PLAN
  INLET SEWER-7
     DOWNCOMER	+•
—	i|
     SUMP-
                                  I
      GROUND LEVEL
                                RECIRCULATING AIR
—VENT SHAFT

      -TOP OF ROCK
v

                                   r—AIR SEPARATION CHAMBER

                                             L
                        I
                                               OUTLET TUNNEL
                      FIGURE 4-2
                           THE METROPOLITAN SANITARY DISTRICT
                                  OF GREATER CHICAGO
                        4-8
 ENGINEERING  DEPART^EMT

                 J AN., 1975

-------
monitored (visually and by computer) at the proposed O'Hare Water




Reclamation Plant,  in the proposed tunnel conveyance system the gates




will be closed as necessary during major storm events to prevent filling




of the rock level tunnel system above a level higher than the crown at




the upstream ends of these tunnels.  This will prevent rapid filling of




the drop shafts which might result in hydraulic surges.  In addition by




keeping the rock level tunnels from being surcharged potential backup of




local sewer systems will be prevented.




E.  Access Manholes




     Access manholes would be constructed at approximately 2,000-foot




spacing along the work tunnel alignments.  Under current MSDGC practices




manholes are placed at approximately 600-foot spacing along tunnel




constructed through earth.  These manholes would be constructed from the




surface downward in a manner similar to the drop shafts; however, they




would require a much smaller excavation.  Some blasting would also be




required in the excavation of some of these elements.  Access manholes




would be located within or adjacent to the parkway or shoulder area




of public roadways.  The construction period for an access manhole is




approximately three months.




F.  Relationship of Proposed Action to Existing Facilities and Other Projects.




     The physical relationships between the existing combined sewer systems




and the proposed conveyance system are exhibited in the preliminary plans




for the project.   (Preliminary Plans for O'Hare Collection Facility, November




1972,  De Leuw,  Gather & Company)
                                 4-9

-------
     These preliminary plans illustrate that under the ultimate plan




(reservoir included) sufficient storage capacity will be available with




the facility to permit plugging the smaller combined sewer overflows.




The larger interceptor outfalls are maintained to serve as safety valves




for the system.  Under the proposed plan, all existing overflows will be




maintained due to limited storage capacity.  The volume of the proposed




conveyance tunnels is approximately 220 acre-feet.




     The existing combined sewer systems have been estimated to be slightly




less than capable of handling a storm of 5-year return frequency.  This




evaluation is a generalization, however, since some subsystems very likely




have a capacity of even less than this.  The proposed tunnel facilities were




planned to provide a flow-through capacity sufficient to handle the




"storm of record" without creating surcharging in the existing combined




sewer system.  The existing systems do not have the capacity to handle




the storm of record volume, and accordingly provisions are made in the




design of the proposed facility for future relief of the existing system




by the local municipalities.




     The total mass discharge from all combined sewer outfalls within




the project area for the 21 years used in the study analysis is 140,000




acre-feet.  This arithmetically averages to 1,867 acre-feet per year being




discharged to the waterways after the facility is in operation.  These




remaining overflows will continue to occur at the existing outfalls.




     Tunnel maintenance, when required, must be done by entering the tunnels




and performing the work in accordance with procedures common within the




industry.  No techniques or equipment not presently available are expected




to be required.  In the event the tunnels must be entered, all inflow and






                                 4-10

-------
control gates must be closed, and dry weather flow diverted to the North




side plant for processing.  Gates are provided at all inflow points to




the proposed tunnel system.




     The design of the tunnel system of the Upper Des Plaines Tunnel Plan




does not depend on or interact with the design of small, local storm




water retention basins, whether existing or to be constructed by the




Villages of Mount Prospect and Arlington Heights.  The Upper Des Plaines




Tunnel and Reservoir Plan contemplates two reservoirs, the Main or Upper




Des Plaines Storage Reservoir, possibly to be located on a site at the




southwest corner of the Northwest Tollway and Elmhurst Road adjacent to




the Main Shaft, and the Mount Prospect Detention Basin to be constructed




adjacent to Drop Shaft No. 1 at Central Road east of Busse Road.




     It is noted that the Main Reservoir and Mount Prospect Detention




Reservoir would fill only irregularly.  Reference to the DeLeuw, Gather




and Company Report, (Figure XI-3 on Page X-8), indicates that in the 21




years of records studied, the computer simulation study indicated that




the detention basin would detain more than 100 acre-feet only 8 times, and




more than 300 acre-feet four times.  Further, the reservoir remains completely




dry except on 24 occasions in the 21 years of record, or approximately




once a year.  The volume of the detention basin as proposed in the DeLeuw,




Gather and Company Report is 850 acre-feet.  Under the simulated condition,




when the Mount Prospect Basin filled to the greatest extent (810 acre-feet)




during the July, 1957 storm, the basin was empty 19 hours after it began




to be filled.  (This is seen by examination of Table XI-2 on Page XI-5




of the DeLeuw, Gather Report.)
                               4-11

-------
     The Main Reservoir,  on the other hand,  is a retention basin.   As the

dewatering rate (24 MGD)  is very small relative to the inflow rate during

storms, its size is essentially equal to the volume of runoff in the

combined sewer area.   Therefore the size of  the Main Reservoir is  almost

totally independent of the rate of runoff or presence of local retention

basins in the combined sewer area.

     The MSDGC is in the process of entering into an agreement with Mount

Prospect and Arlington Heights for the construction of a 130 acre-feet

storm water retention reservoir on a portion of the site of the proposed

Mount Prospect Reservoir.  This reservoir could be a shallow gravity

type, discharging storm water at a reduced rate to Weller's Creek.  The

construction of this storm water reservoir would be made possible  by sewer

separation within the tributary area, to be  performed by the Villages of

Mount Prospect and Arlington Heights.

     If the MSDGC proceeds with construction of the Combined Sewer Detention

Reservoir at the Mount Prospect site at a later date, the separate storm

water reservoir could be abandoned and its volume used for the larger

combined wastewater reservoir.  However, based on feasibility studies it

is possible that it may prove feasible to have two reservoirs on the same

site, a storm water reservoir and a combined wastewater detention  basin,

thereby not recombining the storm water but  continuing to discharge it to

Weller's Creek without treatment.

     At the present time the feasible alternate has not been determined

but this will be established prior to constructing the storm water reservoir.

At this time the MSDGC does not plan to treat storm water except where

this is the most economical manner of reducing combined wastewater-caused

pollution of waterways.
                                 4-12

-------
     The only sewer tunnel and/or combined waste water reservoir projects




which may be implemented in the next 20 years in the Upper Des Plaines




Service Basin, are the O'Hare (Main) Reservoir, the Mount Prospect Detention




Basin and the Upper Des Plaines Intercepting Sewer 22 (Contract 73-314-2S).




This intercepting sewer will be an earth tunnel which will serve a separate




sanitary sewer service area and will relieve the existing Upper Des Plaines




14A and 14B interceptors in Wolf Road.  The service area, size, location




and other information related to this intercepting sewer are shown on




Figure 4.3.




     No determination of the desirability of constructing the combined




waste water reservoir(s) or additional sewer line has been made in this




EIS.  Possible future connections are reported for the purpose of identifying




some options that are available through implementation of the proposed




tunnel conveyance system.




     The selection of the tunnel conveyance system as the proposed sewer




intercepting system for the O'Hare Service Area does not predetermine




the site of the Water Reclamation Plant.




     The location of the dropshafts, earth and rock tunnels are a function




of the existing sewers (especially those serving the combined sewer area),




hydraulic design parameters, and ease of construction and operation and




maintenance.  Nine possible sites are considered in the siting of the




proposed Water Reclamation Plant (See the Draft EIS on the O'Hare WRP,




Chapter 3).  At each site a 7-foot diameter influent sewer would be needed




to dewater the main 20-foot diameter rock tunnel.  Thus, constructing the




recommended tunnel conveyance system leaves open the site selection process




for the Water Reclamation Plant.





                                 4-13

-------
                                                                  N
                                                   Lake County
                                                   Cook County
                         AREA SERVED 15.1 Sq. Miles
                         Design Population 122,616
                                                         ir
                                                       WHEELING
              ARLINGTON HEIGHTS
                              MT. PROSPECT
UPPER DES  PLAINES 22
CONTRACT 73-314-2S
19,000 Ft. of 7'-6" Dia.
$6750,000.
PROPOSED U.D. 21
TO O'HARE W.R.P.
EXISTING M.S.D.
SEWERS TO
NORTH SIDE W.R.P.
                                        THE METROPOLITAN SANITARY DISTRICT
                                               OF GREATER CHICAGO
                                             ENGINEERING DEPARTMENT
                                   FIGURE 4-3

                                      4-14
                             MAY, 1973

-------
                          CHAPTER  5
                     ENVIRONMENTAL EFFECTS OF THE
                           PROPOSED ACTION
     Four key components have been identified for the proposed action.

They are:

     1)  The tunnels

     2)  Eight drop shafts and one main shaft

     3)  Seventy access manholes

     4)  Nine monitoring wells

     The proposed plan is thus composed of separate component parts, each of

which may produce a given impact or degree of impact depending upon its

location and size.  I-n addition, the tunnel conveyance system would have

both beneficial and adverse impacts on the area as a whole.  These two levels

of Impacts combine to produce the overall impact that would be associated

with the proposed tunnel conveyance system.

     A matrix summary of potential impacts at the end of the chapter indicates

the range and types of impacts involved in the proposed action.

A.  Bedrock Geology

     A large portion of the Rock Tunnel Alternative is located in the bedrock

strata.  The general geologic sequence to be expected along this tunnel

alignment is illustrated in Figures 5-1 and 5-2.  The geology as shown in

these figures is greatly generalized and the location, number, attitude and

condition of faults are totally interpretive and not verified by field

observations.  However, the formations involved with the Rock Tunnel

Alternative are stable and the boring of the tunnel would not cause any
                                5-1

-------
           Sbb  BRANDON BRIDGE
          Ob   BRAINARD SHALE
          Faults


          Formation Contacl
NOTE  I.  ELEVATIONS  IN FEET AND
        BASED ON C.C.D (CHICAGO
        CITY  DATUM )

      2  FAULTS REPORTED BY VIBROSEIJ
        SURVEY. HARZA  ENGR. CO.
                   GEOLOGY  AT  TUNNEL ROOF
                                                                            FIGURE 5-1

-------
           Sbb  BRANDON BRIDGE
           SK   KANKAKEE


           Ob   BRAINARD SHALE
          Faults


          Formation  Contact
                                                                          1/4      1/2
NOTE  I.  ELEVATIONS  IN FEET AND
        BASED ON C.C.D (CHICAGO
        CITY  DATUM )

      2  FAULTS REPORTED BY VIBROSEIS
        SURVEY.  HARZA ENGR.  CO.
                                                                     FIGURE  5-2
                     GEOLOGY OF  TUNNEL  INVERT
                                           5-3

-------
slipping or instabilities.




     Due to numerous vertical joints and high permeability of formations,




groundwater would seep into the tunnel during construction.   Because the




tunnel would be fully grouted and lined, infiltration would be reduced to a




minimum after construction.




     The linings for all rock tunnels will be 10-inch plain concrete with a




minimum 28 day compressive strength of 4,000 psi.   This concrete is the




MSDGC standard for dense, watertight, durable concrete in contact with sewage.




Linings for earth tunnels will be 12-inch thick concrete identical to that




above, or precast concrete pipe depending on the Contractor's selection of




method of construction.




     In the case of the proposed rock tunnels,  the lining serves the principal




function of protecting mudstone partings, present in some of the rock members,




from continuous contact with the flowing sewage.   See Figure 5-3.




     The lining, once in place, serves to further reduce potential infiltration




and exfiltration by providing a continuous, virtually impervious barrier




between the tunnel opening and surrounding rock.   For this reason, it is




believed that infiltration can be reduced below that accomplished with unlined




tunnels.




     In addition to the concrete lining, the adjacent rock formations will




be grouted where necessary.  This grouting is intended to seal openings in




the rock through which water may migrate either into or out of the tunnel




system.  There is a practical limit with respect to opening size, with which




cement grouting may be effectively employed.  Results of a previous grouting




program of a recently constructed facility indicate that openings with




infiltration rates less than 1/8 gpm are practically ungroutable, using cement
                                5-4

-------
       ROCK   TUNNELS

          Surface
                           EARTH    TUNNELS

                                -Surface
                             +6O
  +52_

  50 —
OVERBURDEN-
    ESTIMATED    PREDOMINANTLY
    PIEZOMETRIC
    HEAD UNDER   CLAYS AND SILTS
    MAXIMUM
    SURCHARGED
    CONDITIONS
              + 40
RANGE OF PREVAILING
GROUND WATER LEVELS
AT TIME OF SUB-SURFACE
INVESTIGATION
                                            CONC. LINING
                                                                          25
                                                                          50
                                                   PROPOSED 5'
                                                   TUNNELS EARTH
-100
           TOP OF ROCK
                             R A CINE
                             ROMEO
                       7     MA~WKGRAF
                             BRANDON
                             BRIDGE
                               VKAKEE
                            r-BRAINARD
                            -SHALE
                                                    TOP OF ROCK
          GENERALIZED  STRATIGRAPHIC SECTIONS
                                                                          75
                                                                          100
                                                                          125
                                                                          150
                                                                         175
                                                                         200
                              FIGURE 5-3
                                                                5-5

-------
grout, with cost effective results.  For this tunnel conveyance system lining




and grouting are intended to augment each other.




     During the construction period, however, such inflow may temporarily *




result in a lowered water table in the overlying glacial drift aquifer and




dewatering pumpage may contribute to short-term water quality degradation




(mainly turbidity) in Higgins Creek.




     The proposed system would not be affected by the intensity of future




earthquakes predicted to occur in this area.




     Approximately 350,000 cubic yards of dolomite would be removed during




a 2 to 3 1/2 year construction period estimated for various tunnel segments.




These dolomites and the overlying glacial material represent a natural




resource which should be utilized in a productive manner.




     It is anticipated that the restricted usability of the tunnel spoil




material will reduce its value to an extent where double handling is unwarranted,




Therefore it is not expected that a high percentage of the material will be




stored near the main shaft sites.  However in the event of storage of the




material it can be expected that it will have a lower permeability than the




unpaved ground surface thereby increasing storm runoff.  The minor increase




in runoff and its short term nature minimize the significance of this negative




impact.  The rate of removal will be such that it is not expected to have any




significant environmental or economic impact.




B.  Soils and Surficial Geology




     The proposed project will have no significant effect on the weathered




surface soils of the project area, as the construction of the eight drop




shafts and one main shaft represents the largest modification.  There may be




some soil compaction resulting from the operation of construction equipment
                               5-6

-------
in the vicinity of the drop shafts, manholes, and main shaft.




     The earth tunnel portions of the rock tunnel plan would require removal




of approximately 8,000 cubic  yards of subsoil.  The composition of this




subsoil ranges from clayey silts to silty clays, with occasional sand lenses




and some gravel.




     The 12-inch concrete lining in the earth tunnel portion will protect




the shallow aquifers present throughout these morainal deposits.  Construction




techniques are designed to prevent collapse of the earth tunnel and subsequent




earth settling.  These construction techniques have been utilized in the past




and have proven successful.




C.  Hydrology




1.  Surface Water




     Implemention of the proposed plan would result in the improvement of the




water quality of Weller's Creek and Feehanville Ditch, as combined sewer




overflows to these streams would be reduced.  The 29 area outfalls are




indicated on Figure 5-4.  With the proposed tunnel system in operation,




combined overflows to these streams would be reduced from 80 occurrences per




year to fewer than six.  This would respond to the IEPA Water Pollution




Regulations requiring provision for treatment of all combined sewer overflows




by December 31, 1977.




     A dewatering program will be necessary during the construction of the




rock tunnel, as a flow up to 600 gallons per minute could be produced.  This




water will be discharged into Higgins Creek after the water passes through




a settling basin of sufficient size to permit a one-half hour detention period.




The settling basin will be located near the main shaft.  However, this water




may increase the turbidity of Higgins Creek in the short term as the water
                                 5-7

-------
                       WELLER'S CREEK
LEGEND
      EXISTING COMBINED SEWER OVERFLOWS
      INUNDATED FLOOD AREAS OF JULY 1957
                                FIGURE 5-4
                   COMBINED  SEWER OVERFLOW POINTS
                                                                5-8

-------
will not be retained for a sufficient period to eliminate all of the fine




limestone particles.  A discussion of the impacts of the effluent from the




Water Reclamation Plant is discussed in the EIS on the Water Reclamation Plant.




2.  Aquifers




     The proposed modifications should have little effect upon the groundwater




of the glacial material and those shallow aquifers in the Silurian dolomites,




as all tunnels will be lined to prevent infiltration and exfiltration.




However, during construction of the rock tunnels, there will be some loss of




water in the Silurian aquifers due to the necessity of dewatering.  There




should be little water loss during the construction of the earth tunnels.




     The MSDGC and its consultants have considered the general subject of




interference with private and municipal wells by construction activities or




by the completed Upper Des Plaines Tunnel Conveyance System.




     The areas of study fall into two general categories — effects during




construction activities and effects after completion of construction.   The




subjects considered relating to construction operations are as follows:




     a.  Clouding or contamination of wells by tunnel4or shaft construction




         operations;




     b.  Lowering of the water table during construction operations;




     c.  Clouding or contamination of wells by grouting operations; and




     d.  Reduction in well yields due to grouting operations.




     The subjects considered relating to post-construction operation of the




completed facility are as follows:




     a.  Protection of the aquifers from contamination by sewage in tunnels;




     b.  Effect of completed facility on water table; and




     c.  Aquifer monitoring well operations, location, and standards.
                                5-9

-------
     Following is a discussion of the potential impacts listed above.




     Tlu'rp are n number of private wells in the vicinity of the 20-foot and




16-foot rock tunnels (Contracts 73-317-2S and 73-320-2S) that may be




influenced by the construction of these tunnels.  The effect on these wells




is anticipated to be limited to some clouding during grouting operations.




These wells are thought to draw most of their water from the soil-rock




contact area.  A monitoring well has already been located in the vicinity




of all known well areas, particularly near areas where complaints of cloudy




water were received during the subsurface exploratory program.  These wells




will receive constant monitoring during construction.  Should clouding




caused by the grouting operations occur, pump-out of the monitoring wells




may be sufficient to prevent the further migration of grout particles.  If




these procedures fail to prevent cloudiness, fresh potable water may be




supplied for the short time required to complete the grouting and for the




water to return to its original state.  Since the grouting is intended to




extend one tunnel diameter beyond the tunnel walls, no long-term effects on




the wells are expected.




     The potential groundwater drawdown within the glacial till-Silurian




aquifer is extremely difficult to predict.  The ability of water to migrate




from the soil-rock into the tunnel ±s afunction of the number of joints and




bedding planes intersected by the tunnel.  No data is available which will




allow precise arithmetical  determination of joints, bedding planes and




opening sizes which may be encountered.  Several factors are known however,




if only in a general way, which enable a review of the existing soil-rock




conditions and an evaluation of how these conditions may impact groundwater




loss into the proposed conveyance system.  The known factors are the results
                                 5-10

-------
of -soil and rock boring programs performed for the project, a review of


conditions that prevailed on a similar project before and after grouting.


     The glacial till throughout the project area is predominantly fine


grained soils with an estimated coefficient of permeability of 10~° to

   o
10   cm/sec.  These soils do not readily release water and consequently will


not cause significant inflows into the tunnel which will be detrimental to


construction or water levels in the soil.   Isolated sand and gravel pockets


exist within the glacial till which are discontinuous and not connected to


the surface.  These pockets will hold limited amounts of water which, if


encountered by construction, will release their contained water.  The quality


of such water appears to be extremely limited and is not known to be used


as a potable water supply.  These waters will be replaced, in time, after


completion of construction, by natural recharge.


     The Silurian system is described in depth in Volume I, Bedrock Geologic


Investigation of the Geotechnical Report on Upper Des Plaines Tunnel and


Reservoir Plan, Contracts 73-317-2S and 73-320-2S, dated July 1974.  This


report describes the rock systems to be encountered and postulates the


conditions expected to be encountered during construction.  Since the water


bearing features within the rock consist of openings, primarily in form of


cracks and joints, location of the inflows are easily located after excavation,


particularly within machine bored sections.  It is the intention of the Contract


Specifications that grouting be performed shortly after excavation so that


such inflows will be stopped before the piezometric level can be appreciably


affected over any sizeable areal area.


     Two pump-out tests performed in the course of the subsurface investigations


failed to reflect any affect on observation wells as close as 75 feet away.
                              5-11

-------
 This  supports  the contention of Foundation Sciences, Incorporated, geologic




 consultant for  the project, that intersection of joints will have an




 extremely local effect on existing peizometric levels.




      During  construction of a similar project, groundwater actually rose in




 nearby observation wells, as a result of seasonal fluctuations.  Also, on




 that  earlier project, one of the highest inflow areas was adjacent to a




 quarry which was open and dry, further indicating the difficulty in predicting




 groundwater  loss or behavior in the localized area of the proposed tunnels.




      It  is anticipated that drawdown of the aquifer during operation of the




 facility will be virtually zero.  It is expected that grouting will reduce




 groundwater  flow into the tunnel to less than 300 gpm over the total length




 of  tunnels,  based on results obtained with previous projects.  The tunnel




 lining will  further reduce the inflows.  Any openings in the lining which




 permit significant groundwater inflows must be repaired.  Any local drawdown




 which may occur will be short-term, due to the tunnel tightness, and is




 expected to  return to the original piezometric level.




      The design storm of July 1957 represents the most severe storm of the




 21-year  study  period having a postulated frequency of occurrence of greater




 than  once in a  100 years.  During this storm event, the predicted maximum




 hydraulic gradient during peak runoff conditions for the ultimate system,




with reservoirs, will vary between evelation +23  (City of  Chicago Datum)  at




 the downstream end to elevation +52 at the 16-foot  tunnel  upstream end.   This




 dynamic  condition would last for less than one hour.




     Immediately following the storm, the system  will fill to static




 evelation +52, which represents the maximum design  surcharged conditions.




 The length of time the water level within the tunnels will be at elevation
                               5-12

-------
+52 will be approximately 18 hours.  Consequently, there may be a period of

approximately 18 hours that would occur with a return frequency of greater

than once in a 100 years, when the level in the tunnels would be slightly

higher than that of the surrounding groundwater.

     Accurate data is not available on the groundwater levels, or its

seasonal fluctuations.  The groundwater readings taken during the boring

program range too widely to be used with any arithmetical certainty.   Since

the tunnels are being lined due to geological reasons, and since it is

believed that the tunnels can be maintained in a water tight condition,

computations have not been made which would quantify transmissibility

between the tunnel system and the aquifer.

     The following criteria set up by the MSDGC with respect to the aquifer

monitoring wells will apply to the proposed project.

     "To demonstrate that the project is not causing contamination  of
     the groundwater, it will be necessary to set up monitoring programs,
     consisting of sampling wells with instrumentation to provide contin-
     uous recordings of water level and the necessary equipment to extract
     water samples for laboratory analysis.  Instrumentation for recording
     water level within the tunnel will also be required to obtain the
     interrelationship between the groundwater levels and the tunnel
     pressures.

     "Samples will be tested for the following parameters:

     pH              NH--N                 Total Bacteria Plate Count
     BOD             Total Phosphorus      Coliform (M.F.)
     Chlorides       Phenol                Fecal Coliform (M.F.)
     Hardness        COD                   Fecal Strep. (M.F.)
     Alkalinity      Cyanide               Conductivity
                     Mercury               T.S.S.

     Sampling will be performed at each of the wells at two-week intervals

and after each major storm event by the Research and Development Department

of the MSDGC.  Monitoring wells will be installed at approximately one-half

to three-quarter miles along the line of tunnel at a minimum offset distance
                                  5-13

-------
of 30 feet from the edge of the tunnel so as to be outside the grouted area.




Figure 5-5 shows approximate location of monitoring wells considered for




this project.  In order to have continuous information of changes of ground-




water conditions and characteristics due to implementation of this project,




all monitoring wells should be in operation prior to tunnel excavation.




     In response to the concern of certain citizens who experienced well




clouding during the soil and rock exploration program, it is noted that the




nature of the work performed during this program was quite different than




that to be done during construction of the tunnels and shafts.  In the drilling




of the rock and soil borings, water was used, under pressure, to remove soil




and rock particles.  This water pressure apparently caused a migration of




soil and rock strata which serves as a water source for private wells.  The




nature of the construction operations will be such that, during excavation




of the tunnels and shafts, no net flow of water will flow from the construc-




tion areas, but in fact there will be a movement of water, or at least a




tendency of movement, into the excavation areas, thereby precluding the




possibility of groundwater contamination.




     In areas of the tunnel where infiltration of groundwater into the rock




tunnels through bedding planes, faults or fractures is encountered, it will




be necessary to grout at these points.  These openings will be sealed and




groundwater infiltration will be reduced, thereby insuring the maintenance




of the groundwater level above the tunnel and thus eliminating the possibility




of sewage from escaping into the surrounding rock.  The grouting should have




no effect on nearby wells as it is performed with quick setting mixtures




and is thus kept in close proximity of the periphery of the tunnel.




     In the event of any effect on groundwater quality, or potential clouding
                                 5-14

-------
               t1
                I
                I
                I
                I
                  t*2         A
                  v...^i
                                A
 IIIHIIIIIllllllllllllllllUlllllHHIIinilllllHIIIIHIIIIIIIIIlll
                MAIN SHAFT
       V
                                         A
                                                          •r% w, t


                                                           ' •!
                                         WATER RECLAMATION

                                                PLANT
                                                             r
LEGEND

• ••• ROCK TUNNEL
      (APPROXIMATELY 150 FEET BELOW SURFACE)

Illinium EARTH TUNNEL
      (APPROXIMATELY 60 FEET BELOW SURFACE)

  0  DROP SHAFT


  A  MONITORING WELL
FIGURE 5-5
                     LOCATION OF  MONITORING WELLS
                                                                5-15

-------
of wells, grouting operations will be stopped until remedial measures have




been taken to insure the necessary protection of the public.




D.  Land




     A map of existing land uses around the conveyance system has been




included in Chapter 2.




     Without the conveyance system, existing conditions of sewer backups




and stream pollution from combined sewer overflows would continue.  The




entire conveyance system is located underground with drop shafts and access




manholes at ground level; tunnelling will require the acquisition of easement




rights.




     Some surface features of the tunnel project will be located in open space




areas.  Further information needs to be acquired regarding disturbances




during and after construction in park and school properties.




     Land use impacts as prepared by MSDGC, are included in Table 5-1.




Existing zoning and land use controls in the service area will impact future




growth.  The anticipated growth of the area has been evaluated by MSDGC




and NIPC staff with varying findings.  The capacity of the conveyance system




to accomodate future proposed growth is sufficient.  Industrial development




has been forecast by MSDGC from 2000 acres in 1970 to 7300 acres in 2000.




At a meeting of the Planning Committee of the Regional Planning Commission




(NIPC), the NIPC staff indicated that industrial growth patterns would be




half of MSDGC's estimates.  However, MSDGC contends that their evaluation of




NIPC documents, rate of industrial growth and expected growth would support




their projected industrial acreage figure.




     NIPC planning papers do not include industrial acreage forecasts.




After a presentation by MSDGC to NIPC regarding this issue, the Regional




Planning Commission approved the MSDGC design capacity of the conveyance




                                5-16

-------






c
o
•H
a
3
M
4-1
to
C
o
u

rT
cO
M
O
CX
0
0>
H



00
C

0)
a
Cfl
14H
Vi
3

OI
r"j
4J

4J
Cfl

£3
O
•H
4-1
a.
3
M
to
•H
O



•H
V^
O
4J
•H
C
O
**




to
to
o>
o
o
<









W
rH
rH
01
[2






01
rH
O
r?
9
ss




4-1

/^N
to
0)
H
o
<







s~*>
to
0)
M
O
v~/



/— ^
to
CX MH 0)
O
^
Q
CO
(•C
M
M
O
c$
            o

            o
                    O
            oo      o      o      o

            o
            o
            oo
                     00
                                                              m
                                                                      O
                                                                  r-~
                                                                  in
                                                      O
                                                                               C
                                                                               cfl

                                                                               a
                                                                               CO
                                                                               43
                                                                                            VJ
                                                                                            0)
                                                                                            cfl
                                                                                            rJ
                                                                               01
                                                                               s-l
                                                                               •H
                                                                               3
                                                                               cr1
                                                                               01









rH
1
m

OI
rH
Cfl
H

















CO
H
U
&
H
4-1
W 13
W 0)
t3 C
cfl
I e
< Q)
rJ PH









60
•H
)-t W s-^
O rH .
4-1 rH O
•H Q) 53
C*~& ^^f
t-^ ^^
O
SB

•a ai
CU rH 03 ^^
to O M •
O 43 OI O
£X C > 55
X nj O ^-s
W SB O


0)
O
(4 4-1
<4H C Cfl /->
M 01 4-1 to
3 a 43 OI
tfl Q) 60 l-i
43 to i-l CJ
3 cfl ptj <;
trt W v^
                    CN
 0)
4-1
 O
 0)
 0)
c/>
 o
55

 01
 0>
CO
                     OS
                     o
•o-

o
        00
        ro
r~-
o
        m
          •
        o













CO
o>
W
^3

T3
c

I-J



cfl
r
*4H
0
1
to
4J
43
60
•rl /-s 13
BJ >, C
S>i cfl CO
CO U & ,J
^ *H r*
O T) rH M J«!
•H cfl XI CO M
rH O 3 P-l Cfl
O P^ p | N^ p_,
3
PH
0)
CX
o
P4
4J
o
^*\ *H
|i ^_j
M 4J
0) CO
CX iH
0 P
1-1
* &
rH CO
O 4-1 0)
O -H 4J
43 C3 cfl
0 CO >
OT OT -H
M
P*










rH
Cfl rH rH
•H CO cfl
4J -H -H
C O >-i
01 ^ 4-1
T3 OI to
•H a 3
to B 13-
O> O C3
Pti O M
















^j
C

o
CO
>


                                                                                            O)
                                                                                           43
                                                                                            3
                                                                                            O
 O
 c
 0)
 60
 cfl

 60

•H

 E
 OI   •

 O  4J
 60  M
     OI
 O)  CX
43  O
4-1  (-J
     CX
 a
 O MH
 M  O
4H
     OI
 CD  CX
 o

 CO
 c
•H -H
                                                                                                tfl
                                                                                           O
                                                                                                M
                                                                                           M   O
                                                                                           O  U-i

                                                                                           4J  4-1
                                                                                           •H   C3
                                                                                           3   01
                                                                                           C   a
                                                                                           OI   0)
                                                                                           CX   CO
                                                                                                cfl
                                                                                           
-------
system and WRP.




     Factors in addition to conveyance system capacity will result in




ultimate industrial development of existing vacant acres.




E.  Air Quality




1.  Construction Impacts




     Construction would require the use of large vehicles  and trucks,




generally driven with internal combustion engines with the resultant addition




of these air pollutants to the atmosphere.  Under adverse  weather conditions,




residents and animal populations in the immediate vicinity of the surface




construction activity could notice an air quality change.   This would be a




temporary condition during construction, lasting no longer than three months




for access manholes, and 32 weeks for the drop shafts.   Total project




construction activity above and below surface and at the main shaft work




area would extend over a 42-month period.  All of these effects, however,




are anticipated to be minor with the continued improvement in vehicle emission




control devices.  Pollutant levels affecting construction  workers, especially




those employed in the underground tunneling operations, will be within the




limits of the Federal Occupation Safety and Health Act (OSHA) standards.




     Dust from construction activities at the surface sites could be signifi-




cant without proper controls.  The mechanical ventilation  systems used in




underground construction control the quality of exhaust discharged to the




atmosphere.




     Dust raised by truck traffic will be minimized by using hard paved sur-




faces and dust control measures.




     The amount of blasting and thus the volume of particulate matter that




could be emitted from the drop shafts due to blasting will be small and in
                                5-18

-------
low concentrations.  The rock blasted in the shafts will be wet by ground-




water.  In addition, it will, by necessity, need to be matted by rubber




tire or steel mesh mats prior to detonation of explosives, to prevent




release of high velocity particles.




2.  Operational Impacts




     Operation of the system will not produce particulate matter.  No




adverse aerosol or water vapor effects are anticipated to be present in the




construction phase of any alternatives.  During operation, the possibility




of aerosol generation and release from the operation of the drop shafts does




not appear to be a problem.  As presently designed there should be no net




movement of air out of the drop shafts.  During model studies there were no




observations of aerosolization.  Should it be found that the actual drop




shaft operate differently, the openings to the surface could be easily




sealed without hydraulically affecting the structures.




     A marked improvement in the residual odors reported in the Weller's




Creek area should result from the elimination of the combined wastewater




overflows.  Construction activities should not create odor problems.  No other




odor problems are anticipated.  The conveyance facilities are designed to




maintain self-cleansing velocities to prevent deposition of solids and




consequent creation of odors so that there would be no detrimental effects




on the population in the vicinity of the drop shafts and manholes.




3.  Mitigating Measures




     Remedial actions to minimize air pollutants would include effective




enforcement of regulations regarding the operation and maintenance of




construction vehicles.  A continued reduction of emissions from these vehicles




would result as provisions of the Clean Air Act are implemented.
                                5-19

-------
     The levels of partlculate matter resulting from blasting and excavation




could, if necessary, be reduced by scrubbing controlled exhausts of ventilating




systems, effective use of dust control water and chemicals,  and cessation




of surface activities during adverse weather conditions.




     Reduction of pollutants resulting from the operation of construction




equipment will require the constant surveillance to assure all operations




are consistent with MSDGC requirements.




F.  Biology




     The natural ecosystems along the tunnel route have already been




extensively altered or eliminated by human activities.   The  proposed




project will have short term adverse impact on terrestrial plants and




animals from the construction of dropshafts and manholes,,  Vegetation




removed during the project may be replaced to reverse this impact and




restore the habitat for animal life.




     The aquatic ecosystems of Higgins Creek may be adversely affected by




siltation from construction erosion and by fluctuation of water temperatures




produced by the dewatering of tunnels.  Detention ponds should greatly reduce




these problems.  There should be no long term effect on the  stream if species




are able to migrate into the affected area from upstream areas.  The long




term effect of the project will benefit water quality and the stream biota




by greatly reducing combined sewer overflows.




G.  Environmentally Sensitive Areas




     Parklands will be affected by the manhole construction of this project.




This has been discussed with other impacts to area land use in Section D.




H.  Aesthetics




     Most of the tunnel construction will occur underground, reducing




its visual impact.  Surface connections at dropshafts and manholes will cause





                                     5-20

-------
a temporary adverse visual effect, which will be largely corrected when the




construction site is restored.  Manhole covers, 26 inches in diameter,  will




be visable at the ground surface upon completion of the project and replanting




of the sites.  Dropshafts will each have two 47 inch outside diameter




manhole frame and cover castings, and one 3 foot 6 inch by 10 foot open




grate visable from the ground surface.




I.  Noise and Vibration




     Noise levels may reach 120 decibels during construction; however,  most




noise will be intermittent and generally below 100 decibels.  Noise will be




an adverse, short term impact.  Mitigative measures will be taken to reduce




noise from construction equipment and trucks.




     The operation of exhaust systems during construction might be considered




noisy and objectionable by nearby residents.  Both working shafts are not in




residential areas, but are adjacent to heavily travelled roads such as the




Northwest Tollway and Rand Road; therefore, its impact should be minimal.




     The tunnel depth should reduce any blasting vibration during shaft and




possible tunnel blasting.  Blasting operations will be planned to maintain




particle velocities at less than one inch per second and vibration potentials




will be within permissible limits depending on the specific sites where




construction operations are planned.  Information programs will prepare the




public for the unavoidable temporary vibrations and noise.  Construction




schedules would take into account those hours of operation where noise would




cause the least disturbance.  Use of moles will minimize these problems in




the construction of the tunnels themselves.




J.  No Action Alternative




     A no action decision would result in a continuation of the combined
                                   5-21

-------
wastewatcr overflow during peak storms from the 29 outfall points within




Weller's Creek and Feehanville Ditch Drainage Basins.  See Figure 5-4.




This condition, which presently occurs approximately 80 times annually,




would eventually be in violation of IEPA Regulations requiring this waste-




water to be directed to a treatment plant by December 31, 1977.  The




flood hazard would continue to increase.  The sewage generated within basin




would continue to flow to North Side Sewage Treatment Works through over-




loaded interceptors.




K.  Adverse impacts which cannot be avoided should the proposal be im-




plemented and steps to minimize harm to the environment.




     The only long-term adverse impact resulting from construction will be




the very localized soil compaction in the area of the construction shafts.




This impact cannot be considered significant when viewed in light of the




extensive land development and other construction taking place in the area.




Other negative impacts will be of a short-term nature.  The turbidity of




Higgins Creek will temporarily and periodically increased due to the water




pumped out of the tunnels during construction.  In order to mitigate this




adverse effect, a detention pond (^ hour detention time) will be provided to




allow some settling of the materials.  Construction vehicle exhaust and dust




resulting from vehicle operation will also temporarily affect localized air




quality.  Given the magnitude of other air polluting sources in the area, the




incremental effect of this project will be insignificant.  There will be some




adverse impacts from the explosives used in the construction of the tunnels.




These will be restricted to some noise and vibrations.  The noise and vibrations




at the surface will be minimized by careful design and construction controls.
                                       5-22

-------
L.  Relationship between local short term uses of man's environment and




the maintenance and enhancement of long term productivity.




     The construction of the proposed tunnel conveyance system will have




beneficial long-term environmental implications.  The proposed project will




have some short-term adverse effects due to construction, but these will be




greatly outweighed by the project's long-term benefits.  The proposed project




will significantly reduce the number of combined sewer overflows thereby




resulting in a substantial improvement in water quality.  This, in turn, will




have a positive impact on the type and quantity of aquatic life in the local




watercourses.




M.  Irreversible and irretrievable commitments of resources to the proposed




project should it be implemented.




     The proposed  projects will result in a significant improvement in en-




vironmental quality, with respect to the water quality of the local streams.




Construction of the projects will, however, result in the irretrievable commit-




ment of certain resources, such as concrete and energy. Construction of the




tunnel system will commit a certain amount of energy to be used in dewatering




the tunnels.  The concrete will be utilized to line the tunnels following




their excavation.  Energy will be expended in the actual excavation of the




tunnels and to transport materials to and from the construction shafts.  See




Figure 5-6 for a summary of all the impacts associated with the projects.




N.  Findings




     As a result of this EIS, we believe the following actions would serve




to increase the environmental compatibility of the proposed projects:




     1.  The Upper Des Plaines-O'Hare tunnel conveyance system can be




     constructed as proposed, provided the necessary environmental safeguards




     discussed in this EIS are implemented.




                                     5-23

-------
                                  FIGURE  5-6
MATRIX   SUMMARY   OF   IMPACTS
            AREAS IMPACTED                        A LTERNA.TIVF S
                                                                   Ro< k Tunnel
            	                No Action          Alternative
             BEDROCK GEOLOGY                    •                   •


             SOILS AND SURFIC1AL
              GEOLOGY

                  W fathered Soils                   •                   •

                  .s.nl Compaction                   •                  0


             MYimOI.OC.Y

                  Siiif.ii ,• W.il.'t Qu.ihty             Q                 Q

                  ('.muni! W.it.'i  Ou.ihty              •                   •

                  Cuouml W.vtoi  Q\i.inlity             •                   •

                  W.ttc-i  Qua lily- 1 h«K<-na C reok      •                  \^K


             AIR QIIAI.1I Y

                  Vchu Ic I'xhau»t                   •                  f9]

                  CWors                            ^                 Q
             FOOSYSTFMS

                  Wildlife Habitat

                  Rare and F^ndangcred
                    Spt.H ICS

             'I OPOGUAPIIY
             IJ\ND U.SF

                   I,andst aping                       •

                  Traffn  Flow                      •

                  KBtlietn Appearance               •
                    (Surface Structures)

                  Permanent Easements             •

                  Combined Overflow rtizard        ^B


             NOISE AND VIBRATION

                  Noise                             •

                  Vibration                          •


             KEY:

            A     Negative Impact

            •     No Impact

            "")     Positive Impact

             I    Duration of Impact
                   is Temporary (Construction Period)
                                        5-24

-------
2.  The MSDGC should take whatever steps are necessary, within their




control, to insure that the rock extracted during construction of the




conveyance system is utilized in the most environmentally compatible




manner.




3.  The MSDGC should take additional reasonable measures necessary to




decrease the amount of siltation in Higgins Creek due to the water




pumped from the tunnels during construction.




4.  Once the conveyance system is in operation the drop shaft openings




to the surface should be monitored by the MSDGC for any significant




odor and/or aerosol releases.  If these are found to occur on a regular




basis, consideration should be given to the provision of covers.
                                5-25

-------
                              CHAPTER 6
                    FEDERAL/STATE AGENCY COMMENTS
                      AND PUBLIC PARTICIPATION
     A public hearing on this Draft EIS was held on Monday, March 31, 1975,
at Friendship Junior High School in Des Plaines, Illinois.  The Draft EIS
on the O'Hare Water Reclamation Plant and Solids Pipeline was also the
subject of this hearing.  The great majority of the comments received per-
tained directly to the Draft EIS on the O'Hare WRP, others to materials in
both Draft EIS, and some specifically to this EIS on the tunnel conveyance
system.  Only the comments referring specifically to this EIS are addressed
in this Chapter.

     A.  Government Agency Comments
                                   6-1

-------
                UNITED STATES ENVIRONMENTAL PROTECTION AGENCY
  .5JFCT- O'llare Service Area Wastewater Conveyance        DATE-  «PR  s   1975
        System Pre-Draft EIS                "
FROM:    Kenneth E. Biglane, Director'
        Division of Oil and Special Materials (Control (WH-448)

TO:      Regional Administrator
        Region V

        Attn:  Eugene Wojick
             The comments from the Office of Water Program Operations
        concerning subject project are attached.  If any of the issues
        raised in these comments require clarification, please contact
        Geraldine W. Werdig, Chief, Environmental Evaluation Branch
        (202) 245-3054.

        Project Identification

        Location: Des Plaines, Illinois

        Proposed Action;  To construct a system of rock and earth conveyance
        tunnels (know as the Upper Des Plaines Interceptor Sewers) and drop
        shafts  to intercept and convey domestic and storm wastewater from a
        58. 2 sq. mile service area to the proposed O'Hara "Water Reclamation
        Plant.   The tunnel system will be used as a storage reservoir during
        times  of heavy precipitation thus helping to eliminate bypass situations
        which  have been common to the system.

        Present Facilities:  A normal collector and interceptor system
        delivering effluent to local WWTPs in the O'Hara system.  This
        proposed tunnel will supplement the collection system rather than
        alter it.
        Attachment
EPA Form 1320-6 (Rev. 6-72)                       6~2

-------
                   Office of Water Program Operations
                              Comments on
           O'Hara Service Area Wastewater Conveyance System
                              Pre-Draft EIS
    The overall statement does not follow the guidelines specified in EPA's
Preparation of Environmental Impact Statements (40 CFR 6).

    Section 6. 32(e) of the EPA regulations has not been covered with
respect to this project.  The issues listed in §6. 32(c) and §6. 32(f) have
been partially discussed in latter portions of the statement, however,
each should be analyzed individually.

    p.  ii.  In reference to the detention times of 1/2 hour for siltation
ponds, assurance should be provided that the detention time for the
runoff has been established by considering the settling velocity of
the particles most likely to be encountered.   The time should not be
merely approximated.  (See Metcalf and Eddy Wastewater Engineering
p. 282, if necessary).

    p.  2-13.   The water quality figures for Wellers Creek should be
referenced to the appendix so as to reduce the volume of the text while
retaining the detailed information in the appendices.

    p.  2-33.   The population forecast figure should present data for the
years  1910 - 1970, to enable the reader to observe the previous growth
trends of the service area.
                                 6-3

-------
Response:      The three topics listed in Section 6.32(c)(e) (f) have been
               expanded and set apart in Chapter 5 of the Final EIS.

               The half-hour detention time was chosen by the MSDGC on the
               basis of their experience in the area.  Increasing the
               detention time would not result in any significant additional
               increase in the quantity of material removed.  The half-hour
               time is also a minimum, so that at certain times the water
               will be retained for longer periods of time.

               The water quality data for Weller's Creek is now in Appendix
               G.

               Population data has been extended back to 1960.  Earlier data
               has not been provided since it would  require extrapolating
               partial township data to approximate the areas served by the
               project.
                                   6-4

-------
UNITED STATES DEPARTMENT OF AGRICULTURE
SOIL CONSERVATION SERVICE	
P.O. Box 678, Champaign,  Illinois 61820

                                          April  9,  1975


Mr. .Francis T. Mayo
Regional Administrator
U. S. Environmental Protection Agency        ENVIRONMENTAL PROTECT** AGENCY
Region V                                          RECEIVED
230 South Dearborn Street                                 ,_
Chicago, Illinois 60604                           APRHl9/:>

Attention:  Planning  Branch  - EIS Unit        PLANMWG BRANCH - Region V

Dear Mr. Mayo:

The draft environmental impact statement  for the proposed
Metropolitan Sanitary District of Greater Chicago O'Hare
Service Area Wastewater Conveyance  System in Cook County,
Illinois, was forwarded to the Soil Conservation Service
on March 4, 1975 for  review  and  comment.

The statement in Table 2-1,  page 2-14,  concerning fecal
coliform should be checked for accuracy as  there are  state
standards for coliform levels.

The section on biology  (page 2-2J)  is rather brief  to
adequately evaluate the effect of the project on the  fish
and wildlife resource.

The statement in the  biology section on page 2-2J concerning
rare or endangered species may be questionable.   Seven birds
rare in Illinois and  three birds considered endangered in
Illinois occur in the Des Plaines River Watershed and  could
occur in the project  area.

Spoil will be temporarily stored near the main shaft  site
in an undeveloped area  (page 4-5).   Have  provisions been
made to control runoff from  the  spoil site  to prevent  sedi-
ment in nearby Willow Creek?

We appreciate the opportunity to review and comment on the
proposed project.

Sincerely,
Daniel E. Holmes              v
State Conservationist
                             6-5

-------
Response:      Fecal colifonn standards have been added to the referenced
               Table, now in Appendix  G.

               No biological surveys have been conducted on the local
               streams in the Upper Des Plaines Service Area.  The
               Illinois Environmental Protection Agency will be con-
               ducting such a survey on Higgins Creek this summer.

               The rare and endangered bird species have been added
               to Chapter 2.

               The majority of the fine material resulting from tunnel
               construction will be removed in the water which will be
               pumped from the tunnels during Construction.  MSDGC does
               not anticipate any substantial sediment runoff from the
               spoil storage site.  Should any water quality problems
               develop they will take necessary mitigative measures to
               reduce the sediment runoff.
                                      6-6

-------
                  DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT

                                    CHICAGO AREA OFFICE
                                  17 NORTH DEARBORN STREET

   >7"""<»*
-------
Response:      The contractor shall be required to perform his construction
               work in accordance with the satefy rules of the MSDGC, those
               of the State of Illinois and in compliance with the Occupational
               Safety and Health Act (OHSA) of the U.S. Department of Labor.
               Since construction workers will be covered under maximum noise
               levels, residences which are near the construction sites will
               receive lesser noise impacts.  In addition all truck routes
               will be chosen to minimize disruption to residential areas
               and residential streets.

               The exact disposition of the excavated material shall be the
               responsibility of the contractor to dispose of and this shall
               be reflected as a part of the bidding contract.,  The con-
               tractor shall be required to dispose of the material in con-
               formance with all local, state and Federal laws.  USEPA shall
               request that MSDGC keep USEPA informed on the disposal method
               chosen by the contractor.  With respect to the suggestion to
               use the excavated material in coordination with the City of
               Chicago's plan to construct recreational islands in Lake Michigan,
               USEPA feels that an Environmental Impact Statement on the
               desirability of this alternative must be prepared by the
               appropriate federal agency.  Additional opportunity for public
               input and loca, state and Federal input must occur prior to
               any decision on possible use of this material as fill for islands
               in Lake Michigan.
                                     6-8

-------
                 DEPARTMENT OF THE ARMY
                CHICAGO DISTRICT. CORPS OF CNOINCCRS
                    216 SOUTH DCAR0ORN STRCBT
                     CHICAGO. ILLINOIS  «O«O4
NCCPD                                   22 April 1975
Mr. Francis T. Mayo
Regional Administrator
Region V
U. S. Environmental Protection Agency
230 South Dearborn Street
Chicago, Illinois  60604
Dear Mr. Mayo:

This is in response to your letter of 4 March 1975 requesting
comments on the Draft Environmental Impact Statement  (EIS) for
the proposed tunnel conveyance system for Des Plaines - O'Hare
Service Area.  These comments go beyond the specific  scope of
the EIS since there is a potential for subsequent Corps involve-
ment prescribed by our responsibilities authorized under the
Flood Control Acts of 22 June 1936 and 22 December 1944.  Since
any proposed Federal action from a water damage control stand-
point has not been specifically defined at this time, our comments
should be considered preliminary in nature.  Therefore, we may
supplement these comments after our report on the extent of
Federal interest in the over-all Tunnel and Reservoir Plan
(TARP) is completed.

We concur that the segment of the TARP proposed for the O'Hare
Service Area can be separated from the rest of the program.  The
tunnels, however, are an integral part of a comprehensive program
to alievate the problems of water quality and urban water damage
in that portion of the Upper Des Plaines Drainage Basin served
by a combined sewer system.  This fact should be clarified in the
EIS since it is basic to the consideration of the system
alternatives and the decision to retain all flow characteristics,
connections, locations and sizes as under the TARP, as stated in
Chapter 3 of the draft EIS.  The tunnels are designed to not
only capture and convey the first flush of runoff, but also
runoff from a storm event having a recurrence interval of 100
years.  Moreover the tunnels were sized to accommodate a peak
                            6-9

-------
NCCPD                                        22 April 1975
Mr. Francis T. Mayo

discharge greater than the present capacity of the existing
tributary combined sewer system.  Hence, the tunnel, together
with the proposed main reservoir, will not only provide for the
total capture of all discharge from the over-flow points up
to a designated maximum or peak flow, but also reduce the back-up
surcharge loading on the combined sewer system.  Elimination of
spillage into Weller Creek and Feehanville Ditch together with
the treatment of at least the first flush of runoff will result
in significant improvements to the water quality of these streams
and the Des Plaines River.  It will also materially reduce the urban
water damages experienced from overbank flooding as well as both
basement and surface ponding which occur when the outlets of the
overflow points are submerged by high river stages.  Should the
capacity of the existing combined sewers be upgraded to take
advantage of the free draining (no surcharge) conditions provided
by the tunnel sizing, additional benefits attributable to reduction
of water damages within the tributary drainage area can be
achieved.

If, as indicated on page 3-10 of the draft EIS, the main reservoir
is not to be constructed at this time, then the benefits creditable
to the tunnels will be essentially limited to water quality
control and then only that portion creditable to the capture
and treatment of the first 200 acre-feet of runoff.  It is
assumed from the summary on page 5-21 that such control will
result in compliance with the water pollution regulations
adopted by the Illinois Pollution Control Board in July 1973
and approved by your office.  Since the 200 acre-feet of on-
line storage amounts to only some seven percent of the ultimate
design capacity, the text of Chapter 4, Description of the
Proposed Action, should clearly indicate that spillage will
still occur at the existing overflow points and water damage
will continue to be experienced, although the extent of such
damage will be reduced somewhat.

The cost and financing described on page 1-12 of the draft EIS
should be broken down to reflect the applicable subtotals for
the collectors, drop shafts and tunnels.  Such a breakdown would
provide the basis for the financial phasing of the project since
the contract for the connection and laterals (U.D. 20A) is expected
to be awarded approximately one year after work is commenced on
the tunnels (See page 4-3 of the draft EIS) .  Moreover, these
costs should be updated to current price levels; the $36.5 million
at 1972 price levels (see page 3-11) tends to understate the
financial impact of the proposed action.


                             6-10

-------
NCCPD                                        22 April 1975
Mr. Francis T. Mayo

The text of paragraph P, Relationship of Proposed Action to
Existing Facilities and Other Projects, Chapter 4, of the draft
EIS should be expanded to include a discussion of the sewer
separation in the Palatine area.  Separation of storm water
runoff from the sanitary flows in that part of  Palatine
now serviced by combined sewers eliminated the need to extend
the tunnel system.  Because of its interrelationship to the
proposed project, the discussions should include how and when
the proposed separation is to be funded and its implications
in controlling the water quality and flood flows regimen of
Weller Creek.  Similarly, the text on page 4-13 concerning
the Mount Prospect Detention Reservoir should be clarified.
It is not clear whether this reservoir will be constructed
as part of the proposed tunnel system.  Based on the description
given on page A-15, the Mount Prospect Reservoir with 850
acre-feet of storage will function to limit the flow to Shaft No. 1,
Since construction of the main reservoir has been deferred
it is not clear whether or not such a constraint on inflow to
the tunnel is needed and should be included and costed as part
of the proposed project.

The relationship between the disposal alternatives for the
mined rock, soil and subsoil should be discussed in greater
detail in Chapter 5 of the EIS.  This discussion should cover
the availability of existing disposal sites, the costs of
transporting the material for disposal, its beneficial as well
as adverse environmental impacts and public acceptance of the
individual alternatives.  The basis for selecting and insuring
that the disposal method will not have any significant or
economic impact as well as the agency responsible for these
actions should also be clarified.

No information is provided on the impacts of the project
relative to the affected aquatic ecosystems.  The EIS should
discuss the existing aquatic ecosystem and any expected
changes that will result from the capture and removal of the
inorganic and organic pollutants heretofore discharged into
Weller Creek, Feehanville Ditch, Higgins and Willow Creeks
and ultimately the Des Plaines River.  Where applicable the
discussion should include an evaluation of possible in-stream
fishery enhancement, particularly the projected type and
quality of the future fisheries.

The opportunity to review the draft EIS is appreciated.  Should
                            6-11

-------
NCCPD                                        22 April 1975
Mr. Francis T. Mayo

you or your staff have any questions about our comments please
feel free to contact us.

                              Sincerely yours,
                              'JAMES M. MILLER
                              Colonel, Corps of Engineers
                              District Engineer
                             6-12

-------
Response:      Chapter 1, Section E, addresses the status of the combined
               sewage overflow resevoir and the present delineation of the
               O'Hare conveyance system which does not include the Palatine
               tunnel leg present in earlier TARP plans.  The reduction of
               combined overflows to Weller's Creek and Feehanville Ditch
               will decrease from approximately 80 to 6 a year by implementing.
               The proposed conveyance system and WRP.  The cost information
               in Chapter 1 Section F has been disaggragated and updated to
               current price levels to reflect applicable subtotals for each
               construction contract.

               A discussion of possible sewer separation impacts in the
               Palatine area is unnecessary at this time since constructing
               the proposed conveyance system does not foreclose a future
               tunnel leg for the Village of Palatine, should it be shown
               to be a cost effective alternative (see Chapter 1, section E).
               The Mount Prospect combined sewer resevoir (850 acre feet)
               located near Drop Shaft No. 1 is not part of the proposed water
               conveyance system that is being considered for funding.  The
               850 acre foot Mount Prospect combined waste water detention
               basin will be needed to limit the flow to drop shaft No. 1 if
               the upstream drainage area is fully developed, and the upstream
               local sewer system has been upgraded, and if the O'Hare Resevoir
               is constructed or if interconnection to the lower TARP system
               is made.

               Transportation and disposal of the mined rock, soil and subsoil
               shall be the responsibility of the contractor constructing the
               tunnels and shall be included in the  construction bids.  It
               shall be required as part of the construction bid contract that
               any disposal alternative is in conformance with all Federal,
               State, and local laws.  The MSDGC will be required to report to
               USEPA the disposal method chosen by the contractor.

               No biological surveys have been conducted on the local streams
               in the Upper Des Plaines Service Area.  The Illinois Environmental
               Protection Agency will be conducting a survey on Higgins Creek
               this summer.
                                  6-13

-------
                                      STATE OF ILLINOIS
ANTHONY T. Dr.AN
     DIBECTOR
                            DEPARTMENT OF CONSERVATION
                                     605 STATK OFFICE BUILDING
                                      400 SOUTH SPRING ST.
                                      SPRINGFIELD 62706
               HAROLD U. ELLSWORTH
                   ASSISTANT DIRECTOR
                          CHICAGO OFTICE - ROOM 1OO. 1 6O N. LA SALLE ST., 6O6O1
                                                                 April 4, 1975
          Mr.  Francis T. Mayo
          Regional Administrator
          United States Environmental Protection Agency
          Region V
          230 South Dearborn Street
          Chicago, Illinois   60604

          Dear Mr. Mayo:

          The Department of Conservation has  reviewed  the draft EIS's for the
          proposed tunnel conveyance system for  the Des Plaines-O'Hare Service
          Area and the proposed Des Plaines-O'Hare  Water Reclamation Plant and
          Solids Pipeline.

          Both EIS's indicate the project will cause adverse impacts to Higgins
          and Weller's Creeks.  Since these creeks  are presently degraded by
          pollution and channelization and do not maintain a significant fishery,
          the Illinois Department of Conservation believes the project's projected
          improvement in water quality will far  outweigh any minor adverse impacts
          associated with the projects.
                                              Sincerely yours,
                                              Bruce A.  Rogers
                                              Supervisor,
                                              Division  of  Long-Range Planning
          BAR:af

          cc:  Al Lopinot
               Harry Wight
ENVIRONMENTAL PROTECTION AGENCY
      RECEIVED
                                          6-14
                                        Recycled Paper
                                                          . PLANWliNG
                                                           HLKNO,
       APR 1 : 1975
                  .Region V

-------
Response:      Both EIS's for the Des Plaines - O'Hare Service Area indicate
               that the existing conditions of  combined sewage overflows to
               Weller's Creek and Feehanville Ditch will decrease from approx-
               imately 80 occurrences to 6 a year.  USEPA does not view the
               resulting decreased  combined sewage flows to these waterways
               as significant adverse impacts.  The channelization and temporary
               increased situation in Higgins Creek is a necessary adverse
               impact of implementing the proposed projects.
                                   6-15

-------
 ILLINOIS ENVIRONMENTAL PROTECTION AGENCY

      2200 Churchill Road    ^^?5^k   Springfield,  Illinois

                  62706  !M^,"'f-Lv\l  Phone:  217/782-5620
                    Dr. Richard H. Briceland, Director

                       April 15, 1975
Mr. Gary Williams
United States Environmental
Protection Agency
Planning Branch -  EIS  Unit
230 South Dearborn Street
Chicago, Illinois   60604

Re:  Draft Environmental Impact Statements for MSDGC O'Hare
     Service Area  Wastewater Conveyance System and O'Hare
     Water Reclamation Plant and Solids Pipeline

Dear Mr. Williams:

The Agency has reviewed copies of the two' Draft Environmental
Impact Statements  according to provisions of the National En-
vironmental .Policy Act.  The Division of Water Pollution Con-
trol indicates that the final EIS should adequately cover com-
ments of local interests to be submitted at the public hearings.
We offer no other  comments at this time.  Because of the impor-
tance of these projects, you are requested to forward the final
EIS to our Agency  for  our information and review-

Should you have any questions regarding our comments, please
advise.

                                             Sincerely,
                                             Robert P.  Clarke
                                             Operations Coordinator
                                             Environmental Programs
ma

cc:  H.  Williamson
     M.  Mauzy
                             6-16

-------
             VILLAGE  OF   PALATINE
             Fifty-four South Brockway • Palatine, Illinois 60067 • Cook County
             358-7500
  April  21,  1975                                APR 21 1975

                                           PLANNING BRANCH - R«0ioB V
  Mr. Francis  T.  Mayo
  Regional Administrator
  U.S. E.P.A.  Region 5
  230 South Dearborn
  Chicago, IL.  60604

  Re:  Draft EIS  O'Hare Service Area Wastewater
       Conveyance System and Water Reclamation Plant

  Dear Mr. Mayo :

       The following are submitted as comments on the

  above referenced Draft Environmental Impact Statements.

  In reviewing this material, it is noted that portions

  of the  draft statements were taken directly from the

  Environmental Assessment,  and a Facility Planning

  Study,  both  prepared by the Metropolitan Sanitary

  District of  Greater Chicago.  While it is understand-

  able that the U.S.  E.P.A.  must lift technical data

  from studies already completed, it does not appear

  to be in the best public interest nor in the spirit

  of the  E.P.A. Act that such liberties should be

  extended to  the lifting of verbatum conclusions

  derived by the  author of such studies.  It is impor-

  tant that an independent review be given to environ-

  mental  statements submitted to the U.S. E.P.A. so

  the general  public may benefit from the available

  expertise of the agency.   In developing comments on

                          6-17

MEMBER  •   ILLINOIS MUNICIPAL LEAGUE  •  NORTHWEST MUNICIPAL CONFERENCE

-------
the draft environmental impact statement submitted



for the O'Hare Service Area Wastewater Conveyance



System, reference will be made to those sections



covering the preparation of environmental impact



statements as published in the Federal Register,



Vol.  39, No. 138, Wednesday,  July 17,  1974,



(Part III).



    Subpart C, Section 6.304 (b) of the rules covering



the content of environmental impact statements states



that alternatives to the proposed action (must be)



developed, described and objectively weighed.  "The



analysis should be sufficiently detailed to reveal the



Agency's comparative evaluation of the environmental



effects, costs and risks of the proposed action and



each reasonable alternative."  In reviewing the alter-



natives to the wastewater management problem within



the Upper Des Plaines Drainage Basin,  it was stated



(Pg.  3-4) that detailed engineering and cost: analyses



have been made for the Village of Palatine covering



the elimination of the combined sewer system through-



out the Village.  It is the contention of the Village



of Palatine that there has never been a detailed
                          6-18

-------
engineering and cost analysis made for the Village of



Palatine covering the elimination of the combined



sewer system.  This matter has been repeatedly and



consistently challenged by the Village in its contacts



with the Metropolitan Sanitary District of Greater



Chicago.  Enclosed and made part of this response are



copies of letters to the Metropolitan Sanitary District



of Greater Chicago addressing this point.



    It is suggested that a more accurate wording of



D-l on page  3-4 Paragraph 2 would be achieved if the



first line of the second sentence were deleted and



the following verbage substituted therefor:  "In the



latter instance,in addition to the study of various



schemes of collecting and conveying combined sewer



overflows, two methods of sexier separation were



investigated."



    It is further suggested that the first paragraph



of D-l on page  3-5 be deleted and that the following



be substituted therefor:  "However, the above-mentioned



studies prepared by De Leuw, Gather 6t Co. , Consulting



Engineers, Chicago, titled 'Preliminary Engineering



Study of Palatine, Illinois, for Intercepting and
                       6-19

-------
Holding Combined Sewage Overflows,1  dated September,

1973, state that the negative features of these

solutions outweigh the hydraulic advantages,  the

greatest of which would be the descriptive effects

on the residents of Palatine, while 21 miles of sewers

are to be constructed in a relatively small area

(1.6 square miles).

    To furnish completeness and continuity of the

list of selected References,  it is suggested that

the following items be included:

    1) De Leuw,  Gather & Co., September, 1973
       Preliminary Engineering Study of Palatine,
       Illinois  for Intercepting and Holding
       Combined Sewage Overflows.

    2) Consoer,  Townsend and Associates, Village
       of Palatine, Preliminary Engineering Report
       on Hydraulic Relief for the Combined Sewer
       Collection System, dated 11-8-74.

Subpart D, Section 6.512 (a)  provides that the

preliminary alternatives shall be screened with

respect to goal attainment, approximate monetary

costs, significant environmental effects and physical,

legal or institutional constraints.   It is the con-

tention of the Village of Palatine that the draft

environmental impact statement submitted for the
                      6-20

-------
O'Hare Service Area Wastewater Conveyance System

fails to address itself to several significant points.

    1) Goal attainment - The environmental impact

statement,  as prepared, does not specifically identify

the goals anticipated by the proposed project.  On

this point reference is made to P. 60 of the Summary

of Technical Reports prepared by the Flood Control

Coordinating Committee, August, 1972, wherein the

Flood Control Coordinating Committee unanimously

agreed on the following course of action:

   "The final plan for Flood and Pollution
    Control in the study area should be in the
    form of the 'Chicago underflow Plan1 (Alter-
    natives 'G', and 'H1, 'J', and 'S') with the
    Mod 3 level of storage.   These Alternatives
    are less costly and would be more environ-
    mentally acceptable to the community than any
    of the other plans presented.  Detail studies
    along the lines of these Alternatives should
    proceed to develop the final plan layout."

    In supporting this conclusion the Flood Control

Coordinating Committee submitted five points of

rationale(see P. 60-61-62) of said report.  Of

particular importance in drawing these conclusions,

it should be noted that substantial concern was

given by the Committee towards "expressing runoffs

to waterways" for it was feared that adapting this

technical approach to flood relief would compound

the problem of flood water backflow to Lake Michigan.


                         6-21

-------
The distillation of this rationale had been concluded



well after the completion of the technical studies by



 the Soil Conservation Service's Upper Salt Creek Water-



shed Work Plan,  wherein certain channelization improve-



ments and retention basin installation were to be



provided as relief for Storm Water Runoffs within the



Upper Salt Creek Watershed.   In summarizing this point



it would appear that the Foood Control Coordinating



Committee with full knowledge of the Storm Water relief



provisions within the Upper Salt Creek Watershed was



vitally concerned with the surcharging of area waterways



resulting in potential and hazardous flood water



backflows to Lake Michigan.   Yet, despite this compre-



hensive review of various technical reports given by



the Flood Control Coordinating Committee, the Metro-



politan Sanitary District of Greater Chicago proposes



a "cost effective" solution wherein all storm waters



within the 1.6 square miles of combined sewer area



in the Village of Palatine would be expressed to the



waterways thus jeopardizing one of the vital concerns



of the Flood Control Coordinating Committee.



    The Village of Palatine has consistently expressed



its support of the O'Hare Service Area Wastewater
                        6-22

-------
Conveyance System and feels that its exclusion from



the O'Hare Service Area Wastewater Conveyance System



can only result in jeopardizing the goals of the



proposed project as well as diluting its effectiveness.



Notwithstanding these concerns the Village of Palatine



further challenges the comprehensiveness of the



engineering studies submitted by the Metropolitan



Sanitary District of Greater Chicago in support of



the cost effective solution that eliminates the Village



of Palatine from the proposed O'Hare Service Area



Wastewater Conveyance System.  The engineering studies



as submitted completely fail to take into account all



costs associated with the total separation of storm



waters from an old and existing combined sewer area.



Some of the sewer area under question was installed



years before any development of standards regulating



infiltrations, field tile connections, sub-drainage



connections, downspout connections, sump pump con-



nections and certain overflows, etc.  Certainly, if



a cost effective solution is entertained, this solu-



tion must, by necessity, include the cost associated



with eliminating storm water contributions from these



sources.   The engineering studies completed by the
                       6-23

-------
Metropolitan Sanitary District of Greater Chicago
in support of their proposed cost effective solution
eliminating the Village of Palatine from the O'Hare
Service Area Wastewater Conveyance System completely
fails to address itself to the costs of eliminating
the above sources from the existing combined sewers.
It is conservative by estimate that the proposed
11.7 million dollar separation of the Palatine Com-
bined sewer area would have to be multiplied several
fold to arrive at the real cost of such an undertaking.
    In addition to the costs as cited above, the cost
effective solution as proposed by the Metropolitan
Sanitary District of Greater Chicago does not address
itself to revenue losses that would be experienced
by the loss of pumped storage power generation.  This
factor is cited as one of the cost benefits of the
proposed project and must be included as one of items
of concern in its evaluation:

             COMMENTS ON APPENDIX B
               MSGC TARP PROGRAM
          ADDITIONAL PLAN DEVELOPMENTS
          b.  PALATINE TUNNEL ELIMINATON
laragraph 1.  Village of Palatine has advised MSDGC that
              it considers the De Lewu Gather Study of
              September, '73, as incomplete.
                        6-24

-------
Paragraph 2.
Paragraph 3.
Paragraph 4.
No determination has been made on the "k
of flood benefits to be derived from
U.S.  SCS Upper Salt Creek Watershed Work
Plan which could be allocated to the
Combined Sewered Area in Palatine (MSDGC
has committed $4,861,000 to Palatine Area).

A statement as to the most cost-effective
method for preventing discharge of com-
bined sewage to the waterways is premature,
or tentative, at best.

Statement that Village officials have
been informed about this decision through
action of its Board of 10/3/74, is correct.
However, the Village of Palatine has been
in continuing contact with the Board to
have its action reconsidered.

  CONCLUDING STATEMENT
    It is noted that 2570 of the proposed improvements for
the O'Hare Service Area Wastewater Conveyance System is
to be financed from an existing $380 million MSDGC Bond
issue.
    The action of the MSDGC of 10/3/74, referred to above,
included deletion of the Palatine Project from the
$380,000,000.  Construction Bond System.  The Village of
                       6-25

-------
Palatine has no objection to the proposed O'Hare

Conveyance System, as outlined in the EIS Draft,

provided the MSDGC Board Action of 10/3/74, is

modified such that the District will cause to have

completed the De Leuw Gather Study on Palatine and

proposes to participate in any cost-effective

solution in like amounts than it is planning to

contribute to the O'Hare Conveyance System.




Very truly yours,
Anton H. Harwi/g
Village Manager
vb
enclosure
                        6-26

-------
              VILLAGE  OF  PALATINE

              Fifty-four South Brockway • Palatine, Illinois 60067 • Cook County
              358-7500
                                             CERTIFIED MAIL
April 25, 1975
Mr. Francis T. Mayo
Regional Administrator
U.S. E.P.A. Region V
230 South Dearborn Street
Chicago, IL. 60604

Dear Mr. Mayo:

I am in receipt of your  letter  of  denial  to  extend the
hearing record open for  an additional  fifteen  (15)  days
so as to allow the Village of Palatine additional  time
to develop its position  against the  deletion of  the
Village from the proposed deep  tunnel  system.

Although it is true that one of the  reasons  the  Village
of Palatine takes exception to  its deletion  from the
project is financial, we also feel that ample  evidence
exists that will establish that if the Village of
Palatine is deleted from the proposed  project, this
action would also carry  a substantial  negative environ-
mental impact.  In view  of the  fact  that  the United
States Environmental Agency has been established as
the agency responsible for providing the  mechanism to
assure that all interested parties have an avenue  to
introduce their environmental concerns towards a
proposed project, the Village of Palatine naturally
assumed that it would be granted every opportunity to
develop its environmental position on  the proposed
program through your Agency.  My plea  to  your  Agency
was for time to develop  a response to  your Agency's
report and to point out  to the  Agency  certain  portions
of its report which we believe  fail  to represent all
of the facts or draw erroneous  conclusions.

As you know, the subject matter under  question is
highly technical and requires the  analysis of  thousands
of pages of technical data.  Inasmuch  as  the Village of
Palatine did not receive a copy of your Agency's report
until March 18, 1975, we were restricted  to  35 calendar
days to review it, analyze the  report,  develop engineer-
ing studies to repudiate those  sections to which we took
                          6-? 7
 MEMBER  .  ILLINOIS MUNICIPAL LEAGUE  •  NORTHWEST MUNICIPAL CONFERENCE

-------
Mr. Francis T. Mayo
Page two
April 25, 1975
exception and, in addition, prepare a written report
summarizing all of our concerns.

The Village of Palatine contends that, in view of the
above, the U. S. Environmental Protection Agency's
refusal to hold the hearing record open an additional
fifteen (15) days, has caused irreparable damage to
the Village of Palatine's standing in this matter and
that the Agency's action shows bias towards a position
without permitting all of the facts to be placed before
them.

Please advise me as to next stage of the approval
process so that I can enter additional comments.

Yours truly,
Anton H. Harwig
Village Manager
vb
                           6-28

-------
Response:     ( To the April 21 and April 25, 1975 letters from the Village of
               Palatine)USEPA has reviewed the documents submitted by the
               Village of Palatine and find that implementing the proposed
               action indicated in this EIS as the O'Hare Service Area
               wastewater conveyance system does not foreclose the possibility
               of a future interconnecting tunnel serving the Palatine Area.

               See Chapter 1, section E, for a further discussion of this
               possibility.  The changes suggested for Chapter 3 section D
               (pages 3-4 and 3-5 of the draft EIS) have been considered
               and when appropriate have been modified.
                                         6-29

-------
 Advisory Council
 On Historic Preservation
 n.V K Street N.\V. Siiiu'-n
            D.C. 20005
                                                        April 7,  1975
   Mr.  Francis Mayo
   Regional  Administrator
   Environmental Protection Agency
   Region V
   230  S.  Dearborn St.
   Chicago,  Illinois  60604

   Dear Mr.  Mayo:

   This is in response to your request of March, 1975  for  comments on
   the  environmental statement for the O'Hare Service  Area Wastewater
   Conveyance System,  Cook County, Illinois.  Pursuant to  its
   responsibilities under Section 102(2)(C) of the National Environmental
   Policy Act of 1969,  the Advisory Council on Historic  Preservation
   has  determined that your draft, environmental statement  is inadequate
   regarding our area of expertise as it does not contain  sufficient
   information to enable the Council to comment substantively.   Please
   furnish additional data indicating:

          a.   Compliance with Executive Order 11593 of  May  13, 1971.

               In the case of lands not under the control or jurisdiction
               of the Federal Government, a statement should' be made as
               to whether or not the proposed undertaking will contribute
               to the preservation and enhancement of non-federally owned
               districts, sites, buildings, structures, and objects of
               historical, archeological, architectural,  or cultural
               significance.

   To ensure a comprehensive review of historical, cultural, archeological,
   and  architectural resources, the Advisory Council suggests that the
   environmental statement contain evidence of contact with the  appropriate
   State Historic Preservation Officer and that a copy of  his comments
   concerning the effects of the undertaking upon these  resources be
   included  in the environmental statement.  The State Historic  Preservation
   Officer for Illinois is Mr. Anthony Dean, Director, Department of Conser-
   vation, 602 State Office Bldg., 400 South Spring St., Springfield,
   Illinois   62706.
                                   6-30


The Council is ail /Wr/vWi-;;/ unit of the Fwiitti c Uuiirh of the ?'<•,/< n;/ ('inirnimt-iit charged by //>/• At 1 oj
Or/o/'iT 15. 7<>66 In iiill /-c //•(• /'M-W'I/CV/ j«; / T. >•;.»,-,v hi >'••• fi, I,! > < i!i-'.,, •, /'•.  •..;,',.<-

-------
Should you have any questions or.require any additional assistance,
please contact Jordan Tannenbaum (202-254-3380) of the Advisory
Council staff.

                                    Sincerely yours,
                                    John D.  McDermott
                                    Director,  Office of Review
                                      and Compliance
                            6-31

-------
Response:




     We have been in contact with the State Historic Preservation Officer




for Illinois.  Correspondence with appropriate historic and archaeological




organizations is attached.
                                6-32

-------
                  ENVIRONMENTAL PROTECTION AGENCY
                                       May 5,  1975
Mr. John !). Mcl)erifio{:t
]v; recvor, ("f i'icf.  oT Koview & Coiip
Advjsory ."r.T'iell  on Ilb.voric Preservation
15>S/? K r<-j.ivr, H.W.,  .'Ji^.fre 430
       t
-------
                  o                                 >            •
               ILLINOIS  ARCHAEOLOGICAL  SURVEY
                )09 DAVENPORT HALL
UNIVERSITY OF ILLINOIS
URBANA, ILLINOIS  61801
l'-i»f/»i(> of Illinoil
S ^.::,i» Univc
|;|,II-H» Sutr Museum
     Fir. Harlan D. Hirt
     Chief, Planning Branch
     United States Environmental Protection Agency
     Region 5
     230 South Dearborn Street
     Chicago, Illinois 60604

     Dear Mr. Hirt:
          Dr. Peter Roberts of the Illinois Department  of  Conservation
     has sent me a copy of your letter of January 16  and maps  regarding
     the proposed sewage treatment project in the Upper Des  Plaines
     River Basin, Illinois.

          A check of our master archaeological site file indicates that at
     least one known site (a mound) is located near Alternate  2 and one is
     located south of Alternate 1 (village) on the map  showing the alignment
     alternates.  We recommend that an archaeological reconnaissance survey
     be undertaken of the proposed treatment plant site, the pipeline,
     and throughout the wastewater conveyance system  when  an alternate
     is selected.  The portions of the system traversing the Cook County
     Forest Preserve or any tracts not previously disturbed  by urban
     development will.be particularly important to check.

          Please get in touch with our office if we can be of  any further
     assistance with this project.
                                           Cordially yours,
                                            Charles  J.  Bareis
                                            Secretary-Treasurer
     CJB:cb
     cc: Peter Roberts
                                    6-34

-------
                                       April 14, 1975
hsr. Charles J. Bare Is
Secretary - Treasurer
Illinois Archaeological Survey
 3.09 Davenpoit Knll
University of Illiuois
Urbaaa, Illinois  61801

Dear Mr. Bareis

Tidr, will follow up our letter to the Illinois Department of Conservation
dntod January 16, 1975, end your letters to this Agency dated February 10
and March 18 t 1975.
We concur that archaeological input io a necessary part of
assessaente relatiug to projects considered by this office*  We hope that
a xcaeting with your office, Illinois Euvironaeat&l Protection Agency and
the Department of Conservation end our office can be bald to discuss
these issues «,

Presently we ask your Attention to the proposed Ketropolit&n Sanitary
District of Greater Chicago projects in the Upper D*3 Plaines River Basia,
Cook County.  Cur letter of January 16, 1975 to Director Deaa included a
facilities description of the proposal.

A recor/oaissance survey at selected locations nay be necessary to identify
archaeologtcaj. concerns.  Specifically,:

     A.  Solids Pipeline (6.22 miles in length)
         Alternate 1 on the taap previously sent has been the
         nlipucient chosen.  Tiie pipeline is plaoned for existing
         rij:«>t.s-of-way In rjost locations.  A discussion vith
         the Cooh County Forest Preserve District indicated
         Vhnt tha portion propOBed through District property
         ia within an open field and within an existing eighty
         foot right-of-way granted to a Petroleum Products
         Cozapany.


                              6-35

-------
     I.,.   (JOUYJ.'V. ,..^«  t.:Vt't:s»
          occtti.' -:;t  '.ij.-'.'-ii. crop  r;-",-,ft poiars  w*J it apy
          tha dt'C .'•  s^.^fi: Iocai.i'.:.o «t;.d Lu.iar.l cori;'i-.  iM bc-Jroch •• ., -^,J have  irrth^colojlca  conccrr.

     C.   rjr.ter r.-^c' «•.•-. i'. i-w F);v-t
                                              cotver of  Oakton
                    .-.Oftijj (mi-,,-.?!* :-.oute  9.S)  consists of 104  acres.

          oit:e 2,  Jncfit'id ooutli of thy NorUiv^sfc Tollway and  vast
          t.'£ illsiinriJt Koad cenaisttfl of 112 acrcc.
¥?o a;V  t^^fc you rt-fcr Co your /ircJ;saeologic«l files  aad indicate to this
off i co  t'.ie follow jag;
              1.   A'Jdi"c:'.oaal  Jaforn-it.lrus  rTS«rc'ing your Fjarch  1G
                   '£s..cj.,:;:;»enclafcio»\ for an orcliseolotjieal recjE*r>J3ais-
                   »3i\c
-------
                             &TAT I. OF-' ILLINOIS
                   DEPARTMENT  OF CONSERVATION
                            (-OSS/ATI onirr mniniNc

                              400 SOUTH SI'RINc; M
                             SF'RINGFIFLU 62706
                       CHICAGO O KIC,r—12J7 S  MICHIGAN AVC. 60605
ILLINOIS HISTORIC STRUCTURES SURVEY
1800 South  Prairie Avenue              Chicago,  Illinois
GLESSNER HOUSE
         60616
9 April  1975

Mr. Harlan  D.  Hirt
Chief , -Planning  Rmuch
U.S. Knvironmental Protection Agency
230 South Dearborn Street
Chicago, Illinois     6060A

Subject:  Environmental Impact Statement:   Proposed Sewage Treatment
          Project, Upper Des Plaines River  Basin, Illinois

Dear Sir:

So far as we can tell from our incomplete survey of this region  of
Cook County, the. proposed improvement will  not impact any structures of
historic visual  significance.
Yours sincerely,
Paul E. Sprague,  director
Illinois Historic Structures Survey

PES/pck
                                                  ENVIRONMENTAL PROHC1I9N AGENCY
                                                        RECEIVED

                                                        APR 1 1  1975

                                                  PLAA'NIJNG tii
-------
                         STATE OP ILLINOIS



                 DEPARTMENT OF CONSERVATION

                        Ki'i si AII OH ic I- i.uiu UNI;

                          400 SOUTH SPKINC. M

                         SHRINGFIELD 6X706
                    CHICAGO OFflcr—1227 S. MICHIGAN AVE. 6050".
                               April  18,  1975
Mr.  liar Ian D.  Hirt
 Chief
 Planning Branch
 United  States  Environmental Protection Agency
 Region  V
 230  South Dearborn Street
 Chicago, Illinois   60604

 Dear Mr. Hirt:

           Enclosed is a memorandum from my northern area field
 surveyor concerning the historic impact of the proposed sewage
 treatment project in the Upper Des Plaines River Basin.  As
 you  can see by the memo, your project appears to have no adverse
 impact  on historic sites.  Mr. Hild does  note the existance of
 marsh prairie  and I assume that you are taking that into
 account.

           If you need any further information on this, please
 feel free to contact me.

                               Sincerely,
                               WILLIAM G.  FARRAR
                               Director
                               Illinois Historic Landmarks Survey
                               P. 0. Box  986                 .    3
                              • Carbondale,  Illinois  62901

 Enclosure
 WGF/kpg   .
                                                            QN AGF.NO
                              6-38
                           Recycled Paper
                                             LNVIBONMLNTAL HK

                                                  p F H E ' V P.

-------
                                      STATt" Of" ILLINOIS



                             DEPARTMENT  OF CONSERVATION
                                     (.OS SI A "IK 01 IK I  |.l ill I 'I Mi •
                                      SPRINGFIELD 62706

                                CHICAGO OrriCE—1227 E MICHIGAN AVt 80605
          Illinois  Historic Landmarks  Survey                  .    14 Aoril 1075


                                    I-SXORAIxDUM      '         ' -

          T^  Bill Farrar
          Frojj_  T. HilcTW.
          ^uMecJ^   environmental Impact Statement:   Proposed Sewage Treatment
                    Project,  Unper Des Plaines River Basin


          Since our research  in the area under consideration has hardly begun it
 _,        ;as deemed advisable to nake an imediate field-survey.  This was done
f         on Saturday,  April  12.

          To 'accomplish this  I tr-veled  all the routes (alternates and sub-alternates)
          indicated on  the enclosed r^aps.  I did not enter the Cook Bounty Forest
          Preserve  lands except for those portions through which public highways ran.

          The maior part of the' land in  question is covered by industrial p^rks,
          apartnent complexes, and residential subdivisions all of relatively recent
          construction. The remainder of the land was open space which provided rr.e
          unobstructed  views  of wide vistas.

          After covering the  entire route I found no places that would appear to
          qualify for the National Rnip^ter.  In fact, I found nothing that would
          oven qualify for inclusion in our inventory that would b3 in the way of
          the nropossd sewage project.

          1 nipiht add,  however, that-much of the open land in the forest preserves
          nigh-t be  virgin prairie since it appears quite marshy in-places and was
          not settled until relatively late (after the Civil War).


-------
                    ILLINOIS  ARCHAEOLOGICAL  SURVEY
                     109 DAVEN'l'ORT 1I.MX      UNIVERSITY OF ILLINOIS      URNANA, UJJNOIS  61601
    Univrnitv <>' Illinois
    Southern Illinois University
    Illinois State Museum
                                                    May 2, 1975
Mr. Harlan D. Hirt
Chief, Planning Branch
United States Environmental Protection Agency
Region V
230 South Dearborn Street
Chicago, IL  60604

Dear Mr. Hirt:

     Thank you for your letter of April 14 and enclosure of maps pertaining to the
proposed Metropolitan Sanitary District of Greater Chicago projects  in  the Upper
Des Plaines River Basin, Cook County.

     There is no new additional information or changes in the data that we have pre-
viously provided you for these projects.  A check of our master site file indicates
that no known archaeological sites are recorded within the right-of-way of Alternate 1
for the solids pipeline or in the areas of sites 1 and 2 for the Water  Reclamation
Plant.  A field check would have to be made to ascertain whether the village (£k-97)
we previously mentioned, is still located south of Alternate 1.  We.  do  not know the
specific locations of the eight drop shaft points to check for archaeological sites in
our records.

     We, of course, recommend a detailed reconnaissance archaeological  survey of all
project areas to be developed.  Please contact Dr. Robert L. Hall, Chairman, Depart-
ment of Anthropology, University of Illinois-Chicago Circle, Chicago, Illinois.
Dr. Hall'is a member of the Illinois Archaeological Survey and will  be  able to prepare
a time and cost estimate for the proposed survey work.

     I agree wi'th you that we should have a meeting in the future to discuss the impact
of the many applications for interceptor-collection systems and sewage  treatment plants
by various cities and towns throughout the Illinois.  East separate  project could very
well, effect the archaeological resource base in each particular area, and every effort
should be taken to insure preservation of our archaeological resources.

     We appreciate your concern and interest.  Please stay in touch  with  our office.

                                                    Cordially yours,
                                                    Charlies J. Bareis
                                                    Secretary-Treasurer
CJB:sh
cc:  Robert L. Hall
                                       6-40

-------
B.  Public Groups & Citizens
           6-41

-------
          .  *r
          J
oudubon
MM N. RkUjo
< • i, ,• )•,, Illinoi'.
(.ii?) SGP-1716
  R S-olhurannan
  t!, Pn\':o'cnt
  Dr Peter L. Aniss
        C. Flonjn
M i
       :f///K/ fircn'ljry
       i.i b. Kolilni,tn

       of ComnntU't'.t

      ts
       lla Gt'vvtrt/i
      tion
       ne B. Mo!Y'1p^ux
£ £/(/•-. -./Pfl
   F'. Srthuiamaii
^ /f-':/ //(.->
   Sontn Florian
^.vi.1 >:-'
   I •' 'n mi C Finnan
   i-i-i:-n P. Sethuramjn
N,inni' Study &
P,: ••m.rnphy
   Milrlied A. Glucci<
A.- ?/•„',.-
   r/,1 ".-d A. Gkic-ck
f\'~ t t , ' .''/7A
   I'iiMip Habltiuol

   Su.'"-, C Puitin.il i
,'.'r. v:,' .'/c- Ppsi\ircti
   H.ih' n Tweit

6'i"'"' (.'' Oitcctors
   t-l.-rvr C. Bishop
   J.i' '• Bi irknor
   v i-'iini.i J. Blown
   P>: ; i lu.int,-, i
   . k^UH I 1 L» KJI1U tt
   Sunu Floiian
                                                                             7522 East  End Avenue
                                                                             Chicago, Illinois 606^9
                                                                             April 17,  1975
Francis T. Kayo
Regional Administrator
United States Environmental Protection Agency
Region V
23Q South Dearborn  Street
Chicago, Illinois 6o6o4

Dear Mr* Mayo:

Enclosed you will find our comments on the Environmental
Impact Statements for the  following projects:

      Metropolitan Sanitary District of Qreater Chicago
      O'Hare  Service Area Wastewater Conveyance System
      O'Hare  Water Reclamation Plant and Solids Pipeline

We  appreciate the opportunity for  this review.

                            Sincerely,
                                                                        Molyneaux, Chairman
                                                              Conservation Committee
                                                         6-42

-------
                                ENVIRONMENTAL IMPACT STATEMENT
              METROPOLITAN SANITARY DISTRICT OF GREATER CHICAGO
              O'HARE SERVICE AREA WASTEWATER CONVEYANCE SYSTEM
              O'HARE WATER RECLAMATION PLANT AND SOLIDS PIPELINE

       In responding to the environmental impact statements for the above projects we
       would like to state at the outset that we support the two plans, in principle,
       and we believe that they are a big step forward to improve the total water
       quality of the area.  However, our review of these projects would be more
       understandable to all if we were asked to first respond to the total project
       and then to the remaining seven of its partse  ^hia plan would give the reviewer
       the opportunity to judge the impact on the environment of the total program
       rather than to respond piecemeal for each separate part0  Without this complete
       understanding we will respondto the individual projects separately,

       O'Hare Service Area Wastewater Conveyance System
       *"•"^«ww*«"*»"«^•«
       We are concerned about the disposition of the rock and debris removed when digging
       the tunnels* What is to be done with it, and how long will it remain there?

       We would like to see positive statements about measures to be taken regarding:
            Noise pollution abatement
            Heavy drilling effects
            Effect on private wells and supplies of water to those property owners
                during construction - even though monitoring will be done
            Sealing of drop shafts to prevent aerosol release at top. of shafts
            Reduction of particulate matter levels from blasting and excavation
            Restoration of the habitats for plant and animal life by replacing or
                replanting vegetation to its original state
            Incorporating ways to increase the retention time in the pond to reduce
                siltation into Higgins Creek during construction

       .As combined sewer overflows to Weller's Creek and Feehanville Ditch are reduced
       from 80 per year to 6, water quality in these streams will improve and will serve
       to encourage indigent plants and small animals to reestablish in the area.


       O'Hare Water Reclamation Plant and Solids Pipeline

       From our review of the proposal we feel there is more concern for the aesthetic
       value of the plant and its surroundings than the biological impact on the area.
       The fact that so little is known about the effects on public health of bacterial
       and viral respiratory pathogens should cause the Metropolitan Sanitary District
       to promote or to assure that others will promote increasing research in these
       areas in order to solve specific problems. Giving rewards to scientific leaders
       for their accomplishments and setting up future rewards for work to be done is
       one method which could be used. Innumerable others would be of value so that we
       no longer have to say that scientific knowledg'e hasn't uncovered the answers.
       We are concerned with the impact of the plant on Biggins Creek, the nearby
       forest preserve and the flood plain - the biological effects on the population
       of the area, on the local traffic flow through and the size of the buffer zone
       around the plant.
               "                                      Marjorie  Molyneaux,  Chairman
                                                     Conservation Committee
I                                                    Chicago Audubon Society

 -  '                                         6-43

-------
Response:      The rock excavated from the tunnel during construction will
               be temporarily stored near the main shaft.   The contractor
               will be responsible for disposing of the material in an
               environmentally compatible manner.   We are requiring MSDGC
               to report to us on the disposal method selected by the Contractor.

               Measures taken to mitigate any noise impacts can be found on
               page 5-20.  Any vibrations from drilling operations should
               not be noticed at the surface.

               No adverse effects are expected to occure on the private water
               supply wells in the area of the tunnel construction.  Should
               these wells be affected, fresh potable water will be supplied
               until the water in the wells returns to normal.

               If it is found that aerosol releases actually occur from the
               drop shafts, and if it is demonstrated that these could
               result in a public health hazard, MSDGC has indicated that
               the shafts could be easily covered.

               Discussion of the particulate matter resulting from blasting
               and excavation can be found on pages 5-17 and 5-18.

               It is normal procedure for the MSDGC to require their Contractor's
               to restore the vegetation after the completion of construction.

               The detention time of the pond which will receive the water
               pumped out of the tunnels during construction has been
               selected since it will result in the capture of the most
               significant portion of particles from the water before dis-
               charge to Higgins Creek.  While it would be possible to in-
               crease in the quantity of particles withheld would not occur.
               It should be pointed out that this is a minimal time and the
               average detention time may be much longer.
                                  6-44

-------
                         CHAPTER  7
                        SELECTED REFERENCES
Argonne National Laboratory, Energy and Environmental Systems
     Division.  August 1973.  Airport Vicinity Air Pollution Study.

Brown and Caldwell.  1968.  Design Report, O'Hare Reclamation Plant,
     Metropolitan Sanitary District of Greater Chicago.

DeLeuw, Gather, and Co.  1972.  Preliminary Plans for O'Hare
     Collection Facility.

Flood Control Committee.  August, 1972.  Summary of Technical
     Reports, Development of a Flood and Pollution Control
     Plan for the Chicagoland Area.

Greeley and Hansen.  1962.  Proposed West and Northwest Sewers,
     Metropolitan Sanitary District of Greater Chicago.

Illinois Department of Transportation.  1973.  Summary of Local
     Planning Documents in Illinois.

Illinois Environmental Protection Agency.  March 7, 1972.  Water
     Pollution Regulations of Illinois.

Metropolitan Sanitary District of Greater Chicago.  November, 1973.
     Appendix to the Environmental Assessment, Alternate
     Management Plans for Control of Flood and Pollution Problems
     Due to Combined-Sewer Discharges in the General Services
     Area of the MSDGC.

Metropolitan Sanitary District of Greater Chicago.  November, 1973.
     Draft Environmental Impact Statement.  A Plan for Control of
     Flood and Pollution Problems Due to Combined-Sewer Discharges in
     the General Service Area of the MSDGC.  (Tunnel and Reservoir
     Plan).

Metropolitan Sanitary District of Greater Chicago.  November, 1974.
     Environmental Assessment Statements for Proposed Projects
     for the Upper Des Plaines Service Basin, O'Hare Tunnel System.

Metropolitan Sanitary District of Greater Chicago.  December, 1974.
     Facilities Planning Report.  MSDGC Overview Report.
                               7-1

-------
Northeastern Illinois Planning Commission.   1971.   Regional
     Wastewater Plan.

Northeastern Illinois Planning Commission.   September, 1974.
     Regional Water Supply Report #8.

Walton.  1964.  Future Water Level Declines in Deep Sandstone
     Wells in Chicago Region, Illinois State Water Survey,
     Reprint Series #36.

U.S. Department of Commerce, Bureau of the Census.  1970.
     Census of Population, Numbers of Inhabitants, Illinois.
     PC (DA15-I11.

De Leuw, Gather &  Company.   September, 1973 Preliminary
     Engineering Study  of Palatine,  Illinois  for  Intercepting
     and Holding Combined Sewage Overflows.

Consoer, Townsend  and Associates, Village of  Palatine, Preliminary
     Engineering Report on Hydraulic Relief for the Combined
     Sewer Collection System, Dated  11-8-74.
                                 7-2

-------
THE  METROPOLITAN  SANITARY  DISTRICT  OF  GREATER  CHICAGO

                         APPENDIX  A

               O'Hare Area Flood Control Activities

                       Design  Criteria
    Wilke-Kirchoff Reservoir,  Project  70-407-2F
    Heritage Park Reservoir, Project 68-815-2F
    .White Pine Ditch Retention Reservoir, Project 72-313-2F
    Buffalo Creek Retention Reservoir, Project 67-803-2F
    WillowHiggins Retention Reservoir, Project 68-836-2F
    Mount Prospect Retention Reservpir, Project 69-308-2F

-------
   THE  METROPOLITAN   SANITARY   DISTRICT  OF  GREATER   CHICAGO
WILKE-KLRCHOFF RESERVOIR, PROJECT 70-407-2F
     The Wilke-Kirchoff Reservoir is a multi-purpose, excavated flood-
water retarding, pump evacuated reservoir constructed by the Metropoli-
tan Sanitary District of Greater Chicago, in cooperation with the
Village of Arlington Heights, at a cost of $871,000.  The reservoir
occupies a 16 acre site, is 12 feet deep, and has a storage capacity of
100 acre-feet.  It serves a 717 acre tributary area and is designed to
accommodate a 100 year storm.

     The Wilke-Kirchoff Reservoir is located south of Kirchoff Road,
and east of Wilke Road in the Village of Arlington Heights.

     The reservoir was designed to serve as a recreational facility, in
addition to its primary function of reducing local flooding.  Possible
winter activities include tobogganing and skiing on a large earth mound
in one corner of the reservoir formed with excavated material.  Summer
activities can include such things as volleyball, basketball, baseball,
soccer, football, and a general play area.  All recreational activities
are supervised by the Arlington Heights Park District.

     The reservoir is excavated in a clay soil.  The side slopes are
7:1, providing easy access to the bottom of the reservoir for recrea-
tional usage.  The bottom and side slopes are sodded to prevent erosion
and to present an esthetically attractive appearance.

     A pumping station, located at the northwest corner of the site con-
tains three variable speed pumps with a capacity of 6.67 cfs to 12 cfs
and two low flow pumps with a capacity of 0.33 cfs.  These pumps can
empty a full reservoir in 6 days.  Most storms, however, will not fill -
the reservoir completely, and the dewatering time will be less than 6
days.  An underdrain system is provided beneath the reservoir floor to
remove the excess ground and storm water and thereby provide maximum
recreational usage of the reservoir bottom.

     Storm sewers draining the tributary area carry the runoff into the
reservoir through two inlet structures.  At low flows, the runoff drops
through a grate in the inlet structures and is conveyed to the pumping
station through the reservoir dewatering system.  The multi-purpose use
of the reservoir is enhanced by use of th.e.low flow bypass system.  The
water from the reservoir is pumped through a 30 inch force main to a
storm sewer that discharges into Weller^Creek, the natural drainage out-
let for the reservoir tributary area.

     Construction of the reservoir began in August 1972, and was com-
pleted in the fall of 1973.  The Metropolitan Sanitary District contri-
buted $736,000 of the construction cost and the Village of Arlington
Heights contributed $135,000.  In addition, "the Village 'of Arlington
                                  A-2

-------
   THE   METROPOLITAN  SANITARY  DISTRICT  OF  GREATER  CHICAGO
Heights paid $195,000 to acquire the reservoir site and also assumed
the engineering design costs.  The Village will be responsible  for  the
operation and maintenance of  the facilities.
                                 A-3

-------
 WILKE - KIRCHOFF RETENTION RESERVOIR
  RESERVOIR  - PROJECT NO. 70-407-2F
OUTFALL SEWER - PROJECT  NO. 71-310-2F
SHEET 1 Of 2
     DRAINAGE AREA              717 ACRES
     DESIGN STORM                 100 YR.
     PUMPING STA. CAPACITY        36.7 c.f.s.
     CONSTRUCTION COMPLETED
     CONSTRUCTION COSTS         $ 871,000
     LAND AREA                14.6 ACRES
     LAND COST                 $ 232,000
                                                 N
                                          EXISTING STORM
                                            SEWER
        VILLAGE OF ARLINGTON HEIGHTS
            LOCATION MAP
                            METROPOLITAN SANITARY DISTRICT
                                 OF GREATER CHICAGO
                               FLOOD CONTROL SECTION
                                                 JAN. 1973
               A-4

-------
                   WILKE -  KIRCHOFF  RETENTION RESERVOIR
                     RESERVOIR - PROJECT NO.  70-407-2F
                  OUTFALL SEWER - PROJECT NO.  71-310-2F
                                                                          SHEET 2 OF 2
         PUMPING STATION
                                                     /-30- GRAVITY
                                                    V  OUTFALL
                                RESERVOIR LAYOUT
 thv. fl
 not
TO
no
695
630
885
680
615
670
665
MC
    STORAGE IN BASIN - 100 acre ft.
      TOTAL STORAGE • 100 sere ft.
            RESERVOIR BASIN. FLOOR 677.5'
«" SEWER -
       W SiWEHJ   2J- SEWER-/  24- SEWER
                                                1665.6'
                                        PUMP STATION
                                      PROFJLE
   STORM PUMPS  #1, n & #3
   VARIABLE -  3.000 to 5.400 gpm
         6.67 to 12.0 cfs - 100 hp
     SUMP PUMPS #4 & #5
   CONSTANT - 150 gpm - 0.33 cfs
               7.5 hp
 TOTAL PUMP CAPACITY - 16,500 gpm
                   36.7 cfs
    OVERFLOW @ 689.5' elev.
PUMP CONTROLS - SPARLING - FLOAT
                                                                               30" R.C.P.
                                                                               GRAVITY SEWER
70S
700
895
680
685
680
875
870
665
660
                                    73 F 539 R2
                                               METROPOLITAN SANITARY DISTRICT
                                                     OF GREATER CHICAGO
                                                   FLOOD CONTROL SECTION
                                               E.E.W.                   JAN. 1973
                                              A-5

-------
   THE  METROPOLITAN  SANITARY  DISTRICT  OF  GREATER   CHICAGO
HERITAGE PARK RESERVOIR, PROJECT 68-815-2F
     The Heritage Park Reservoir is a multi-purpose flood water reser-
voir constructed at a cost of $270,000 by the Metropolitan Sanitary
District in cooperation with the Village of Wheeling and the Wheeling
Park District.  The reservoir is on a 25 acre site and has an average
depth of 5 feet.  It has a usable storage volume of 112 acre-feet which
serves a tributary area of 447 acres and is designed to accommodate a
100 year storm.

     The reservoir is an excavated storage gravity discharge structure.
The reservoir was designed as a multi-purpose facility for recreation,
in addition to its primary function of reducing local flooding.  A per-
manent lake, about 8 acres in area and 5 feet deep, is provided to en-
hance the recreational features of the reservoir and usage for winter
activities.  Tobogganing and skiing utilize a large earthen hill con-
structed east of the reservoir with material excavated from the reser-
voir.  The adjacent park areas are utilized for all other seasonal
activities.  Recreational activities are supervised by the Wheeling
Park District.

     The reservoir side slopes are 4:1 or less, permitting easy access
to the reservoir bottom except for the permanent lake area.  The reser-
voir area is grassed to prevent erosion and enhance the recreational
use.
                      "» T
     The reservoir is emptied through a 60 inch diameter pipe into the
Wheeling Drainage Ditch.  A flap gate on the 60 inch discharge pipe pre-
vents water from the drainage ditch entering the reservoir during peri-
ods of high water in the Wheeling Drainage Ditch.  The flap gate also
restricts the flow of storm water out.of the reservoir until flow capa-
city is available in the Wheeling Drainage Ditch.

     The reservoir construction was completed in 1970.  The Metropolitan
Sanitary District contributed $180,000 of the facility's construction
cost and the Village of Wheeling contributed $90,000 for the construc-
tion and paid the engineering design costs.  The land for the reservoir
was provided by the Wheeling Park District.
                                A-6

-------
                    HERITAGE  PARK WEST RETENTION RESERVOIR

                                PROJECT  NO. 68-815-2F
                            •I
                            DRAINAGE AREA           447 ACRES
                            DESIGN STORM             100 YEARS
                            PUMPING STA. CAPACITY         NONE
                            CONSTRUCTION COMPLETED     2-16-70
                            CONSTRUCTION COSTS        $270,000  TOTAL (M.S.D. PAID 67%)
                            LAND AREA                25 ACRES
                            LAND COST (furnished by village)                        »
                                                     RESERVOIR

                                                        RD.
             DRAINAGE AREA
                                    VILLAGE OF WHEELING
                                                      *

                                LOCATION MAP
                                                           DISCHARGE
                                                           PIPE
                                                           \
       i
         WHEELING RD.
               RAILROAD
                     •MAX. WATER ELEV. IN
                      RESERVOIR 639.0
       WHEELING DRAIN. DITCh
       WATER EL. 638 5 WITH
       10 YR. RUNOFF
GROUND  LINE
INV.
                                    PROFILE
                       650  ~
                            V)
                                                                                   CD
                                                                              640

                                                                              630
                                                                     MHROPOKTAN SANITARY OISTRII
                                                                         OF dHATER CHICAGO

                                                                        FLOOD CONTROL SECTION
                                       A-7

-------
   THE  METROPOLITAN   SANITARY   DISTRICT  OF  GREATER   CHICAGO
WHITE PINE DITCH RETENTION RESERVOIR, CONTRACT NO. 72-313-2F
     The White Pine Ditch Retention Reservoir is a project of inter-
agency cooperation that will divert flow from the White Pine Ditch
Watershed to control chronic overbank flooding and sanitary sewer back-
up caused by storm flows entering and overloading the sanitary sewer
system.  The need for additional.public services to assist: people in
flooded areas, and the loss of direct access to or around flooded areas
with emergency equipment, is costly to the habitants in both life and
assets.  Diversion of the existing and increased flows from the road im-
provement and urbanization will convey the flows to a reservoir site
with the capacity to store the excess storm runoffs.  Along the water-
course no site could adequately provide the protection from the 100-year
storm event.

     The Dundee Road improvement project, developed and under construc-
tion by the Department of Transportation, State of Illinois, includes
the larger sized storm sewer to divert flows from the White Pine Ditch
to the east.  The discharge of this sewer and the naturally contributing
areas are directed into the retention reservoir of 50 acre-feet storage
capacity.  The reservoir and White Pine both discharge into Buffalo
Creek.

     The Village of Buffalo Grove reported the monetary flood related
losses for the year 1972 to be $50,700.  These losses for the White Pine
Ditch area only involved 119 homes.

     Cost involvement for the reservoir project are as follows:
$120,000 from the Metropolitan Sanitary District, $130,000 from the
Department of Transportation of the State of Illinois, and any addi-
tional cost by the Village of Buffalo .Grove.

     In addition to the construction cost for the reservoir, the Sani-
tary District will administer the construction contract and the Village
of Buffalo Grove will secure the land rights upon which the reservoir is
located.

     The Sanitary District has authority to undertake this work and com-
mit funds without a general election.  Plans and specifications were
awarded August 8, 1974.  Work will be completed by May 1, 1975.
                                  A-8

-------
                         WHITE PINE DITCH  RESERVOIR
ORKXHAl WHITE PINE PITCH DRAINAGE

AREA 1585 ACRES) 	
WW1E PINE DITCH DRAINAGE AREA DIVERTED

BY HI6HWAY IMPROVEMENT (315 ACRES)	
                                                   FLOOD DAMAGED

                                                   RESIDENTIAL AREA
                                                   RESERVOIR BY M.S.O.

                                                   (Sae ditail below)  .
                                                                   ||RO


                                                  STORM SEWER BY STATE HIGHWAY AGENCY
                              LOCATION PUN
     \   )
ml  'fc S «.^

I    i   6th green by others

i— •»
<4C    CONSTRUCTION PLAN
                                                               2nd tee
 7th to by othtrs
                                              A-9
                                                            1st green
                                                                        IXHIBIT 3


                                                          METROPOLITAN SANITARY DISTRICT


                                                                 OF GREATER CHICAGO


                                                               FLOOP CONTROL SECTION

-------
   THE  METROPOLITAN  SANITARY  DISTRICT  OF  GREATER  CHICAGO
BUFFALO CREEK RETENTION RESERVOIR, CONTRACT NO. 67-803-2F
     Urbanization of the Buffalo Creek Watershed has,increased storm
runoff and flooding in areas adjacent to Buffalo Creek and the Wheeling
Drainage Ditch in the Village of Buffalo Grove and Wheeling.   To reduce
this flooding, the proposed Buffalo Creek Retention Reservoir will im-
pound approximately 700 acre-feet of storm water.  This valley reservoir
will be an earthfill dam located just west of Arlington Heights Road and
south of Checker Road in Lake County.  A culvert control structure will
pass low flows and limit the maximum discharge from the reservoir to ap-
proximately 250 cfs.  An emergency spillway will be provided to pass
storm flows from storm events that exceed the 100-year storm event stor-
age capacity and to protect the dam structure.

     Additional construction work includes a levee or other flood pro-
tection method for the private buildings adjacent to the reservoir site
north of Checker Road.  Checker Road will be raised above the high water
elevation as will the new bridge over Buffalo Creek.  The reservoir site
is approximately 160 acres located west of Arlington Heights Road in
Section 31 of Vernon Township, Lake County.  The site also included some
area in Wheeling Township, Cook County.  Total cost to the District is
estimated at $2,100,000.

     Project implementation will be guided by a Cooperative Agreement
between the Lake County Forest Preserve District, Village of Buffalo
Grove, and the Metropolitan Sanitary District.

     The reservoir site will be a multiple-use facility for open space
recreation uses, in addition to the primary function for flood control.

     The Sanitary District has authority to undertake this work and com-
mit funds without a general election.  Plans and specifications will be
available for bid advertisement in March, 1975.  The construction con-
tract will be let within 90 days after bid advertisement.  Work will be
completed by December, 1975.
                               A-10

-------
                                                                                      in
vu
O
MJ
I-*
W4
cs
O
Ci
Cu
                                         A-ll

-------
   THE  METROPOLITAN   SANITARY   DISTRICT  OF  GREATER  CHICAGO
WILLOW-HIGGINS RETENTION RESERVOIR, PROJECT 68-836-2F
     The project includes the construction of two storm water retention
reservoirs, Willow-Higgins Creek Channel Modifications and Willow Creek
relocation to control the flooding in the Willow-Higgins Creek Watershed
for the 100 year storm event as shown on Exhibit 1.   This provides for
storing flows from the-O'Hare Water Reclamation Plant that exceeds chan-
nel capacity.  The reservoirs will be located in the O'Hare Airport run-
way clear zone areas.  Clear zones are provided at the ends of runways
because of the high noise level in these areas, the  need to control ele-
vation of structures in runway approaches and to provide for aircraft
over run conditions and thus are unavailable for individual public use.

     The Ravenswood Reservoir site is located approximately 2750 feet
from the end of the runway 32R-14L and the Lee Street Reservoir site is
located approximately 900 feet from the end of runway 4L-22R.  The
Willow-Higgins Creek Channel Modifications will be a closed concrete
section downstream of the Lee Street Site.  The Willow Creek Relocation
will consist of both grass lined earth channel and closed concrete sec-
tions as physical conditions permit.

     Willow Creek will be relocated generally along  the western limits
of O'Hare Airport south of Old Higgins Road, and then northerly to the
Ravenswood Reservoir.

     The project will relieve the flooding problems  in the Willow Higgins
Watershed downstream of O'Hare Water Reclamation Plant for storm events
dp to the 100 year frequency.  Relocation of Willow Creek would facilitate
the future development of O'Hare Airport.  Also, conveying the flow of
Willow Creek drainage area to the Ravenswood Reservoir, will effectively
utilize the greater storage capacity available at the Ravenswood site.

     The flows added by O'Hare Water Reclamation Plant will be stored
at Ravenswood Reservoir when the flow in the downstream channel exceeds
the design capacity.  These added flows will result  from the treatment
of flows from an ultimate population equivalent of 439,000 in the service
area and also from the treatment of the storm flows from a combined sewer
area of 8000 acres located in Weller Creek Watershed, part of Upper
Des Plaines Tunnel and Reservoir Plan.
                                        *
     The proposed project would have following long term effects:

     1.  Eliminate flood damages for storm events up to the 100-year
         frequency and would provide peace of mind to the citizens
         in flood prone areas.

     2.  Provide storage  for additional flows from the proposed
         O'Hare Water Reclamation Plant.
                                A-12

-------
THE METROPOLITAN  SANITARY  DISTRICT  OP  GREATER  CHICAGO
3.  Facilitate the O'Hare  Airport  expansion program.

4.  Use land located in clear zones for  additional public benefit.

5.  Increase property valuation by. control of overbank flooding
    and thereby increase real estate tax revenues, even with the
    removal of some private land from the tax rolls for the project.

-------
J  "*
   o C3

-------
   THE  METROPOLITAN   SANITARY  DISTRICT  OF  GREATER  CHICAGO
MOUNT PROSPECT RETENTION RESERVOIR, PROJECT NO. 69-308-2P
     The reservoir will be an interim facility designed to provide a
certain level of protection to the area until such time as the Tunnel
and Reservoir Plan is implemented.  At that time, the reservoir will be
enlarged from 130 acre-feet (interim) to 850 acre-feet (ultimate).  The
basin will function by gravity.  No pumping will be required.

The interim plan involved 130 acre-feet of storage providing relief tc
the upstream storm aewer system.   The Village will be responsible for
the measures necessary to convey separate storm flows into the reser-
voir.  Conversion to the ultimate facility will involve enlargement of
the reservoir and conveyance facilities to bring combined overflows
into the reservoir.

     The interim facility will store storm flows only.  The ultimate
facility will include measures to handle combined flows.  The DeLeuw
Gather report, "Preliminary Plans for O'Hare Collection Facility", con-
cerns the O'Hare Tunnel and Reservoir system of which the ultimate fa-
cility will be a part.  The interim facility is not covered in this re-
port.  Detailed design and analysis of the interim proposal will com-
mence subsequent to the completion of negotiations with the Village and
the purchase of the site.

     Drop Shaft No. 1 under the Tunnel and Reservoir Plan for the
(O'Hare) Upper Des Plaines Basin will be situated at Central Road and
We Her Creek.  The 850 acre-foot Mount Prospect combined waste water
detention basin will function to limit the flow to Shaft No. 1 to 800
cfs.  Based on a fully developed upstream drainage area, and an unre-
stricted upstream local sewer system (exceeding 100-year design storm
frequency), this flow was exceeded 24 .times in the 21 year record period,
there were.21 times the maximum detention volume did not exceed 100 acre-
feet.  Twelve times the volume detained did not exceed fifty acre-feet.
The maximum time of detention in the study period was 20 hours.  This
was for a recurrence of the July 1957 storm.  In general, the detention
period would be a small fraction of the 20 hour maximum even under full
development conditions.

-------
                                                        N
ARLINGTON HEIGHTS
                                      Ave.
                                            MT. PROSPECT
                                               VILLAGE BOUNDARY
                                     EXISTING M.S.D. SEWER
                                    MT. PROSPECT
  SITE OF PROPOSED
  MT. PROSPECT
  RETENTION RESERVOIR
  CONTRACT 69-308-2F
                                    THE METROPOLITAN SANITARY DISTRICT
                                          OF GREATER CHICAGO

                                        ENGINEERING DEPARTMENT
                            A-16
                                                        AUG., 1973

-------
   THE  METROPOLITAN  SANITARY  DISTRICT  OF  GREATER  CHICAGO
                         APPENDIX  B

                      MSDGC TARP PROGRAM

Combined Sewer Overflow  Elimination

     The selected plan for eliminating untreated combined sewer over-
flows or plant bypasses  was chosen from various alternatives and was
described in the August  1972 "Summary of Technical Reports," presented
by the Flood Control Coordinating Committee.   Since 1972 refinements
to sub-systems of the plan have been made as  additional studies and
sub-surface exploration  work have been performed.

     This chapter first  describes the August  1972 Recommended  Plan
and then describes the five revisions that have been made.   These
revisions do not change  the concept of the plan but only present
additional development of the project to reflect sub-system optimiza-
tion.
August 1972 FCC Recommended Plan

       Description and Maps

       After extensive review of the alternatives, the Flood Control
Coordinating Committee unanimously agreed that the Alternatives "G",
"H", "J" and "S" Mod 3, are less costly and would be more environ-
mentally acceptable to the community than any of the other plans
presented.  Detailed studies and layouts along the lines of these
plans were then continued to develop the recommended plan.

     The system recommended herein, a composite of several of the above
Alternatives, is outstanding in its relative  storage economy and
simplicity.  It will capture the total runoff from all of the record
meteorological sequences of history, if they  were to recur on future
ultimate developed drainage basins, except for the peak few hours of
three of the most severe storm events.  The system will convey these
captured combined sewer  flows through high velocity, out-of-sight
underflow tunnels below  the routes of the existing surface water-
courses to large pit-type storage reservoirs.  Figure M-IX-1 shows
the general location of  the conveyance tunnel system and storage
reservoirs.

     The primary storage reservoir is shown located in the area now
occupied by the sludge lagoons of the Metropolitan Sanitary District
in the McCook-Summit area.   This reservoir will be in the form of a
300 to 330 feet deep rock quarry, with a maximum water depth of
approximately 200 feet,  in the heaviest storm .event,and water  surface
dimensions averaging about 1,000 feet wide by 2 1/2 miles long.  Total
storage capacity of the  reservoir with the water surface as its
maximum level of -100 CCD,  will be 57,000 acre-feet.

     Figure M-X-2 shows  the general layout of the reservoir, conduits
and pumping facilities.   The lower 100 feet of depth of the reservoir

-------
    THE  METROPOLITAN  SANITARY  DISTRICT  OF  GREATER  CHICAGO
 will be divided into  three  basins  by transverse  dikes,  providing  two
 small basins,  each with a volume of  5,000  acre-feet  for the more
 frequent small runoff periods.  The  larger runoff  volumes will  flood
 the remaining  basin and the water  surface  will rise  in  elevation  over
 the entire reservoir.

      The dewatering pumping station  shown  on  Figure  M-X-2 will  dis-
 charge from the storage reservoir  to the West-Southwest  Treatment Plant
 at an average  rate of about 700 cfs.  The  station's  total capacity
 will be 2400 cfs in order to dewater the conveyance  tunnels and Stearns
 Quarry into the reservoir within two or  three days following  a  storm.

      Computer  studies indicate  that  the  storage  utilized in Basins 1
 and 2 will exceed their combined volume  (10,000  acre-feet) at an
 average frequency of  six or seven  times per year and that these two
 basins alone will entrap more than 70% of  the annual combined sewer
 spillage containing over 957» of the  annual Suspended Solids.

      The use of a deep pit  storage basin of such magnitude and  depth
 requires that  aeration be provided to insure  positive odor control by
 floating equipment.  This is necessary because the range of liquid
 level varies over 200 feet.  It is proposed to use submerged  turbine
 aerators provided with a downflow  draft  tube  with  air injection below
 the propeller.

      The submerged turbine  aerators  will be provided with a bar screen
 to prevent large ice  chunks from being drawn  into  the draft tube  and
 damaging the blades.   The aerators will be provided  with legs to
 protect the draft tube and  will need a minimum of  20 feet of  water to
 operate.  When floating at  greater depths, it is considered that
 active aeration will  be limited to the upper  50  feet of the water in
storage.

      Aerators, in the heaviest  rainfall  year  will  be in near  continuous
 operation in or above Basins 1  and 2. A lesser  amount  of aeration on
 an intermittent schedule will be required  in  Basin No.  3.

      An aerated reservoir of lesser  depth  and a volume of  1,800  acre-
 feet, will be  provided near the proposed O'Hare  Water Reclamation
 Plant, to serve the combined sewered area  of  the suburban communities
 to the northwest.

      Another reservoir will utilize  the existing Stearns rock quarry
 in the vicinity of 28th and Halsted  Streets.  This reservoir  will
 provide approximately 4,000 acre-feet of storage space  and will be
 used only during record storm events to  flatten  out  the peak  discharge
 through the conveyance tunnels.
                                 B-2

-------
   THE  METROPOLITAN  SANITARY  DISTRICT  OF  GREATER  CHICAGO
     Conveyance Tunnels

     There are approximately 120 miles of conveyance tunnels inter-
cepting 640 sewer overflow points in the 375 square mile area served
by combined sewers.  Most of the conveyance tunnels will be constructed
in the Silurian Dolomite rock formation 150 to 300 feet below the
surface of the waterways.  In some areas, the smaller tunnels will be
constructed in the clay overburden.  See Figure M-X-3, 4 for profiles
of the tunnels.

     The tunnels will in general be drilled by mining machine (moles),
except for the largest sizes which will probably be constructed by
the conventional drill and blast method.

     Three main conveyance tunnel systems fork out from the primary
reservoir facility located in the McCook-Cummit area.  See Figure M-X-1.
Figure MX-1.   The Des Plaines Tunnel Svstem extends north alone the
Des Plaines River to the Village of Des Plaines,thence northwest
terminating at the Village of Palatine.  The Mainstream Tunnel System
extends under the Sanitary and Ship Canal, the North and South Branches
of the Chicago River and the North Shore Channel to the Wilmette
controlling works.  The Calumet Tunnel System extends south and south-
easterly along public right-of-way to the Sag Channel, thence eastward
under the Little Calumet, Grand Calumet and Calumet Rivers to near the
State Line.  The storage space in the conveyance tunnel system is
9,100 acre-feet.

     Drop Shafts

     The spillages will be delivered to the tunnels by hundreds of
vertical drop shafts, capturing the present spillage from the existing
riverbank sewer outlets of over five thousand miles of near-surface
sewer systems.  A typical drop shaft is shown in Figure M-X-5.

     The drop shafts will have a split vertical shaft, one side for
water and the other side for air.  The center dividing wall will have
slots to insufflate air in the falling water.  This reduces the impact
when the air-water mixture hits bottom.  An air separation chamber is
provided to reduce the amount of air entering the tunnel.  At the top,
a vent chamber will allow air to escape during filling and to be drawn
in during dewatering.

     Groundwater Protection and Recharge

     The major project elements are sited in rock units of the Silurian
System of the geologic strata underlying the Chicagoland area.  These
limestone and dolomite rock units, together with the hydraulically
interconnected overlying glacial drift, comprise the so-called shallow
aquifer of the region which is recharged by local  rainfall.
                                  B-3

-------
   THE   METROPOLITAN  SANITARY  DISTRICT  OF  GREATER  CHICAGO
     Additional data on protection of groundwater  and  limitation of
infiltration into tunnels and storage areas  is  available  in  Technical
Report No. 4, Geology and Water Supply.   This upper aquifer  system is
used as a water supply for individuals and certain municipalities.
However, the water supply for the  vast majority of the area  is  through
piped systems using Lake Michigan  water.

     The preservation of groundwater quality and quantity is achieved
by positioning the project elements in the best available rock  units,
taking advantage of the natural low permeabilities of  the rock  and
augmenting this low permeability by sealing the water  bearing bedding
planes and joints, thus providing  for elimination  of the  direct connec-
tions between the aquifer and the  project element.

     Additionally, the naturally high piezometric  level within  the
aquifer will provide a positive inward presssure providing additional
assurance against exfiltration of  flows.   In those areas  were excessive
groundwater withdrawals occur, adversely lowering the groundwater
table, the added protection could  be provided by artificial  recharge
to restore high levels around the  project element.  The identification
of this recharge need, however, can only be  made after sub-surface
exploration, testing and detailed  positioning of the project elements.

     Benefits

     A brief listing of anticipated benefits to be derived from
completion of the system of flood  and pollution control proposed
herein, includes the following:

     1.  Protection of the valuable water resources of Lake  Michigan
         from flood release of river water as now  required through
         the existing Chicago River, the North  Shore Channel and
         the Calumet River into Lake Michigan.

     2.  Achieving and maintaining acceptable water quality  (in
         accordance with National  Goals and Regulations of the
         Illinois Pollution Control Board and the  Metropolitan
         Sanitary District) in the open waterways  known as the
         Chicago River and its branches,  the Sanitary and Ship
         Canal, the North Shore Channel,  the Ca.lumet-Sag  Channel
         and those portion of the  Calumet River, Des Plaines River,
         Salt Creek and other open waterways, under the jurisdiction
         and control of the Metropolitan Sanitary  District of Greater
         Chicago.

     3.  Reduction of surface and  basement flooding by underground
         backwaters or overbank flooding.

-------
   THE  METROPOLITAN  SANITARY  DISTRICT  OF  GREATER  CHICAGO
     4.   Improvement of recreational values of all surface waterways.

     5.   Increase in property values due to general improvement of
         environment.

Additional Plan Developments

     The plan described in previous sections was produced in 1972.
The intervening two years have provided the opportunity to incorporate
new analysis and information, and improve the Plan accordingly.  These
up-dates can be grouped under five headings, with the revised Recommen-
ded Plan shown on the attached map (Figure M-X-6).

     a.  Independent Calumet System:   The most significant revisions are the
separation of the Calumet Area from the Central System and having an
independently operating system with dewatering to the Calumet Plant.
         The decision to separate the Calumet Area was based on detailed
study^ ' of operational flexibility and cost.  This study originated
with the recognition that several potential reservoir sites exist in
the Calumet Area, and the cost of the 55,000-foot connection tunnel
($100 million) would be saved by independently operating systems.

         The study considered three alternative concepts, each with
several variations:

         A.  Maximum Size Intertig Tunnel Plan;  In this plan, no
storage would be provided in the Calumet area.  All flow would be
directed to the McCook-Summit area terminal reservoir.  Economies
would be realized by concentrating terminal reservoir facilities.
These savings would be compared to the extra costs associated with
conveyance facilities required to concentrate the storage.

     This scheme is similar to the layout shown in Figure M-X-1 (the
Recommended Plan from the Summary of Technical Reports) for the
project area remaining after exclusion of the O'Hare sub-project area.
However, these studies included drainage flow from the communities of
Lansing and part of Markham which were not a part of the prior studies
made In support of the Summary of Technical Reports.  This  additional
drainage flow is included as well in all other alternatives evaluated
in this study.

             An Intermediate Size Intertie Tunnel Plan.  Storage would
be provided in the Calumet area but it would be an amount which would
be insufficient to accommodate all of the runoff in the Calumet area,
during a large storm.  In these instances, the Calumet area reservoirs
would fill and, subsequently, flow would be diverted through the
inter!ie tunnel to the McCook-Summit area reservoir.
                                 B-5

-------
   THE  METROPOLITAN   SANITARY  DISTRICT  OF  GREATER  CHICAGO
             No Intertie Tunnel Plan.  In this scheme,  storage volume
provided in the Calumet area would be sufficient to accept the excess
combined sewer flow in that area.  The Mainstream and Des Plaines Tunnel
Systems would drain to the McCook-Summit area terminal  reservoir.

             Several variations within each of the above  basic concept  plans
are possible and were examined in this study so that the  least-cost
representation of each of the above concepts could be identified.  This
led to development of twelve separate project layouts for comparative
evaluation, which included different reservoir locations  and tunnel
systems.

Initial Evaluation of Project Layouts;  The evaluation and cost estima-
ting methods employed in the initial phase of this study  are identical
to those used in the studies which are reported in the Summary of
Technical Reports.  The same basic unit costs and cost  curves were
used as were the computer programs previously developed.   These were
accepted and used to conduct simulation studies which yielded results
concerning performance of the twelve project layouts.  A  "trial and
error" procedure was employed in the development of these layouts
wherein tunnel diameters and reservoir sizes were first assumed; then,
for selected storm events, the system performance was simulated by
electronic digital computer cooperation; and system performance defi-
ciencies were noted upon completion 'of the computer run.   Adjustments
were then made in tunnel diameters and reservoir dimensions as
indicated by the simulation analysis results.  The procedure was
repeated until all of the twelve project layouts satisfied the perfor-
mance requirements.  These performance requirements were  to limit
the overflow quantities during repeat of the largest storms to prevent
backflow to the Lake and to treat the captured water at the existing
treatment plants at a rate such that the total flow to the plant
combined with dry weather flow did not exceed 1.5 times average dry-
weather flow.  The estimates of costs of construction of  the sanitary
systems were compiled using the cost parameter data developed for the
prior studies.

     The general approach employed in the initital evaluation phase
of this study is presented here.  The prior studies which are described
in the Summary of Technical Reports showed that, of the 21 year
continuous record of precipitation, a tunnel-reservoir system which
functioned adequately in simulation analysis during the events of
July 12-13, 1957 and October 3-12, 1954 would also function satis-
factorily throughout the remainder of the period of record.  Further,
the tunnel sizes required in any given layout were dictated principally
by conditions which prevailed during the 1957 storm: a storm which
yielded the maximum instantaneous peak runoff flow.  Also, the prior
studies showed that the total reservoir storage volumes required
were controlled by the conditions which obtained during the 1954 storm.
                                  B-fi

-------
   THE   METROPOLITAN   SANITARY   DISTRICT  OF  GREATER  CHICAGO
Moreover, an approximate correlation existed between the reservoir
requirements established by simulation of the 1957 storm and those
established by simulation of the 1954 storm.

     For these initial evaluation studies, only the July 12-13, 1957
precipitation event was used in simulation analysis step of the work.
This was made necessary because of the large number of computer runs
required and the especially lengthy run-time of the 1954 event simu-
lation.  The July, 1957 analyses yielded the required tunnel diameters
of the several schemes.  The construction costs of these tunnel networks
were computed.  The July, 1957 analyses also indicated reservoir volume
requirements for satisfactory system performance for this event.
These values were extrapolated to approximate total reservoir volume
requirements which would be needed for satisfactory system performance
during the October, 1954  storm.  Reservoir construction cost estimates
were then developed.

     Cost comparison of the twelve alternatives was made on the basis
of the sum of the tunnel and reservoir costs.  These were regarded as
the controlling project costs since these two project compontents
comprise approximately ninety percent of the total construction cost.
Additionally, much of the remaining 10 percent of construction costs
consist of modification of surface collection facilities and drop
shafts, both elements being a common and near-constant cost factor for
all proposed systems.

"Least Cost" Alternatives - Detailed Evaluations;  The maximum size
intertie tunnel plan (Scheme 1A), the intermediate size intertie
tunnel plan (Scheme 2E), and the no intertie tunnel plan (Scheme 3A),
having been identified as the most economicaly systems for each of the
three concepts, were examined in greater detail than the remainder of
the alternatives.  Each of these schemes include the use of existing
quarries as reservoirs.  These quarries, already having depths in
excess of 200 feet and large volumes available, had distinct advantages
over other sites with no significant existing storage volume such as
in the sludge lagoon sites.  Preliminary reservoir layouts were made
for these plans and more detailed construction cost estimates were
prepared as shown in Table M-X-1.

     The totals show the cost advantage of 3A, separation.  Addi-
tional advantage is found in the freedom of construction phasing.
                               B-7

-------
   THE  METROPOLITAN   SANITARY   DISTRICT  OF  GREATER  CHICAGO
TABLE M-X-1  LEAST COST SCHEMES ESTIMATE OF CONSTRUCTION COSTS; MILLIONS
             OF DOLLARS (Based on a Limitation of Stockpile  Height  of
             200 Feet in the McCook-Summit Area)

	Sum of Tunnels and Reservoirs (1972 Costs,  Unescalated)	 	
Item
Scheme 1A
Scheme 2E  Scheme 3A
1.  McCook-Summit Reservoir
                      2
2.  Thornton Reservoir

3.  Mainstream On-Line
       Reservoir

4.  Tunnels1

5.  Pumping Stations

    a.  McCook-Summit
    b.  Stearns Quarry
    c.  Thornton-Calumet

TOTAL, without contingencies
   496
    15

   691
    71
     8
 1,281
  351

   56


   15

  568
   65
    8
	3£

1,093
  286

   74


   15

  552



   64

	30_

1,029
 Estimates of tunnel cost require a determination of whether  or  r>ot
 they are concrete-lined.  The final decision concerning concrete
 lining must be reserved for the design phase of the project  and
 completion of subsurface investigations.   This  decision cannot  alter
 the conclusions of this optimization study because all  project
 layouts will be similarly affected.
o
 Includes credit for future sale of rock and other future land values,
                                  B-8

-------
   THE  METROPOLITAN  SANITARY  DISTRICT  OF  GREATER  CHICAGO
     As a result of these studies, the interconnecting tunnel  has  been
eliminating and planning and subsurface explorations have  been concen-
trated on development of the plan with an independently operating
Calumet System.

     b.  Palatine Tunnel Elimination

         An additional revision is the elimination of a tunnel leg into
the Village of Palatine.  A report titled "Preliminary Engineering
Study of Palatine, Illinois for Intercepting and Holding Combined-
Sewage Overflows" was completed in September, 1973.  Eighteen  alternate
solutions were studied.  The lowest cost alternate for a tunnel and
reservoir concept system for Palatine area to connect to the O'Hare
System, as originally proposed was $22,700,000.  Of the alternates
discharging to Salt Creek Water Reclamation Plant, the lowest  cost was
$17,300,000; however the recommended tannel and reservoir  concept
system was estimated at $18,900,000.  It was further established that
construction of a separate new five-year storm sewer system for the
combined-sewer area would cost $11,100,000 and the construction of a
new sanitary sewer system would cost an estimated $12,700,000.  Either
a new storm sewer system or new sanitary sewer system would eliminate
combined-sewer overflows in this drainage basin.

     At the regular Board Meeting of April 22, 1971, the Board of
Trustees of the District approved the U.S. Soil Conservation Service
Upper Salt Creek Watershed Work Plan.  This plan, of which the District
is a local sponsor, is a comprehensive program which will  prevent
overflow of Salt Creek in the Palatine area.  The District has already
committed $4,861,000 for seven projects under the Work Plan.  In view
of this program, the flood control benefits of the District's  Tunnel
and Reservoir Plan for the Palatine area will not be required.

     The estimated cost of the tunnel and reservoir plan exceeds the
estimated cost of separating sewers within that portion of the Village
of Palatine which has combined-sewers; and therefore, the tunnel and
Reservoir concept is not the cost-effective method for preventing
discharge of combined-sewage to the waterways.

     Therefore, the Palatine tunnel leg in the Northwest Area  of the
District has been eliminated and at meetings with  the Village  of
Palatine the Village Officials have been so  informed.

     c.  Mainstream Dual Tunnel System

         A third revision or updating  includes dual tunnels for the
Mainstream System from Summit to Lawrence Avenue.   The August 1972
Plan included a 42-foot diameter or equivalent along this reach.  In
order  to maintain a uniform slope, this tunnel would  have to  be constructed
through the Maquoketa shale.  This shale formed from clay sized
                               B-9

-------
   THE  METROPOLITAN   SANITARY   DISTRICT  OF  GREATER  CHICAGO
particles is a softer rock than the dolomitic limestone, and presents
different stability considerations for both long-term use and during
construction.  Thus, the construction in this shale will be more costly
than in limestone.

     During 1974, additional rock borings have bean made to further
identify the location of this shale formation and additional analysis
have been performed.  As a result, it has been determined that the most
cost-effective plan is to construct a smaller tunnel first at the
required slope and at a latter date construct a second tunnel which
would be totally in the limestone formations.  Each of the dual tunnels
would provide one.-half the required conveyance capacity.

-------
TABLE
int. M 1 1 HUKULl I AN OAraiiAnT uiaimui
M-X-2 TUNNELS MAINSTREAM SYSTEM (McCook
v/r uncAicn omv*
to Confluence)
K\a\J 	 —

SINGLE TUNNEL
LINE
Z
3
4
5
6
7
8
9
10
11
12
13
14
15
16
48
49
50
LENGTH DIA.
7,095
13,575
8,00
8,600
7,332
8,368
10,992
11,718
8,285
4,095
5,451
4,104
3,823
2,865
24,400
11,300
14,580
42
42
42
42
42
42
42
42
42
42
42
42
42
42



SUBTOTAL
TOTAL
Cost
shown exclude
shafts
COST
$ x 1000
$> I/,UUU
15,600
29,800
17,600
18,900
16,100
18,400
24,100
25,700
18,200
10,800
11,900
9,010
8,390
6,290



$247,790
$247,790
, connecting

Dia.
33
33
33
33
30
30
30
30
30
30
30
30
30
30





structure
DUAL TUNNELS
Stage I
COST DIA.
$ x 1000
10,820 35
20,700 35
12,200 35
13,120 35
9,750
11,130
14,620
15,590
11,020
6,520
7,250
3,650
3,400
2,550 35
35
35
35
$152,890
$263,848
and contingences
Stage II
COST
$ x 1000
9 1 i , DUU
7,810
14,930
8,800
9,460









3,150
26,840
12,430
16,038
$110,958


R-n

-------
   THE   METROPOLITAN   SANITARY  DISTRICT  OF  GREATER  CHICAGO
     The Table M-X-2 compares the construction costs of the single tunnel
with the costs of the dual tunnel system.  As can be seen the cost
difference is $16 million or 6 per cent of the total.  This difference
is  insignificant when considering the total costs of the program.  There-
fore, also considering the uncertainties of grant funding, the dual
tunnel system is chosen because the first tunnel can be constructed at
a lower initial cost and provide for the capture of in excess of 80 per
cent of the pollutants now discharged to the waterways, and thus obtain
an  early return on the invested funds.  The dual tunnel system also
offers time to further optimize the size needed for the second tunnel
to  meet project objectives.

     d.  Mainstream On-Line Reservoir

         Another revision has been elimination of Stearns Quarry as the
location of the Mainstream On-Line Detention Reservoir.  This reservoir
has been included in the Plan in order to reduce the size and cost of
the Mainstream Tunnel System.  Without such a reservoir, the lengthy
Mainstream Tunnel would have to increase in size from a 42-foot diameter
equivalent tunnel to a 55-foot diameter equivalent tunnel^).

         The Stearns site is now being filled in and will eventually
be  used as a park.  The previous studies had considered this site only
in  relation to evaluating different alternatives of solving the combined-
Sewer overflow problem, and not in terms of the specific details of the
site.  It has now been determined that the best and highest use of the
site is as a park.

         In its place, a Mainstream On-line Reservoir at an unidentified
site is included.  The location of this reservoir can be anywhere along
the tunnel between the Stearns site and Wilmette Harbor.  Since this
reservoir will be used only during the large storms of record to reduce
the peak flow rates to the tunnels, it will be one of the last facilities
to  be constructed.  If a suitable site is not found for the reservoir,
the alternative does exist to increase the size of the second tunnel of
the Mainstream Dual Tunnel System.

     e.  Des Plaines Watershed

         A fifth revision provides for the total capture of the combined-
sewer overflows in the Des Plaines River Watershed.  The August 1972 Plan
included the equivalent of a Mod 3 level of capture for the sizing of the
Des Plaines River Tunnel and the O'Hare Northwest System.  However, as
was stated in the report, total capture would be needed in order to meet
the higher water quality standards of the General Use and the Public and
Food Processing Water Supply Designated waterways. (See Figure M-X-7.)
This was the case in the Little Calumet River and the North Branch of
the Chicago River Upstream with its junction with the North Shore Channel.
Tunnel sizing is provided so as not to spill into these waterways.
                                   T5-1 O

-------
   THE  METROPOLITAN  SANITARY  DISTRICT  OF   GREATER  CHICAGO
     The higher water quality standards for the above waterways includes,
among others, the requirement that the dissolved oxygen level shall not
fall below five milligrams per liter at any time.  The computer simu-
lation of the overflows into the Chicago and Calumet River Systems
(designated as secondary contact waters) demonstrates that depression of
the oxygen levels below five milligrams per liter will occur.  Since these
latter waterways have a lower water quality designation and instream
aeration is to be provided the Mod 3 level of protection is judged to be
adequate.   However, it is not judged to be adequate in the Des Plaines
River Watershed.  A computer model of the Des Plaines River has not been
developed as for the above waterways.  However, the same level of contami-
nants would be discharged during overflow and the results can be expected
to be the same.

     Therefore, the plan now includes reservoir capacity in the O'Hare
Area to provide for total capture and increased sizing in the Des Plaines
River tunnels to transport a higher rate of flow to the Mainstream-
Summit Reservoir.

     In the O'Hare Area, the August 1972 Report provides for an 1800
acre-foot reservoir including capacity for Palatine.  Subsequent
Analysis (3) demonstrates that 1280 acre-feet is required for the
equivalent of Mod 3 level storage for the O'Hare sewered area and 2700
acre-feet for total capture.  Provision for the latter quantity of storage
is being included in the Plan.  The sizing of the tunnels is not changed
because of the decision to include total capture.  The tunnel size has
been chosen to transport dry-weather flows to the O'Hare Plant, and on
the basis of transporting peak storm flows with an On-line reservoir
providing for the detention of peak flow rates so as to control the tunnel
surcharge.  The cost of both the 2700 acre-foot O'Hare terminal storage
reservoir and the On-Line reservoir is included in the Plan.

     The Des Plaines River Tunnel has been increased in size to provide
for total capture.  This size increase is shown on Table M-X-3.  The
original size was picked such that spillage to the waterways occurred
during a repeat of the July 1957 storm, (the storm of record for rate of
flow) at  approximately the same ratio to total flow as in the Chicago
and Calumet River Systems'.  During the 1954 storm (the storm of record
for total volume), there was no spillage to the Des Plaines River and the
total flow was transported to the reservoir.  Thus, no additional storage
volume is needed to provide for total capture and only increased tunnel
sizing is required.
                                 B-13

-------
   THE  METROPOLITAN  SANITARY  DISTRICT  OF  GREATER   CHICAGO
TABLE M-X-3  TUNNELS-  DBS  PLAINES RIVER SYSTEM

LINE
18
19
20
21
22
23
24
25
26
27
2?
29
30
LENGTH
(ft.)
8800
5040
11,280
9460
12,200
11.200
8160
14,390
5100
8600
7050
10,380
6470
TOTAL
DIA. (FT
36
15
10
36
32
15
32
32
32
24
24
24
24
CAPTURE
. ) COST
($ x 1000)
15,224
2,974
3,948
16,366
17,690
6,608
11,832
20,866
7,395
8,600
7,050
10,380
6,470
\
MoD 3 LEVEL
DIA. (FT.)
30
15
15
30
25
15
25
25
25
25
25
20
20
PROTECTION
COST
($ x 1000)
11,704
2,974
6,655
12,582
12,810
6,608
8,568
15,110
5,355
9,030
7,403
8,304
5,176
 TOTAL 118,130              135,403                     112,279
 Cost shown exclude  shafts,  connecting structures and contingencies

-------
                     THE RECOMMENDED PLAN
                           AUGUST 1972     "
• STORAGE
  RESERVOIRS
a TREATMENT
  WORKS
                       FIGURE   M-X-1
                     B-15

-------
                                        CNI

                                        ><
      DEVELOPMENT  OF  A FLOOD AND POLLUTION
     CONTROL  PLAN FOR THE CHICAGOLAND AREA
         PART 5 - ALTERNATIVE SYSTEMS

PRELIMINARY  LAYOUT OF STICKNEY  RESERVOI

-------
THOUSANDS OF KET->- 0    10    20   30    40   SO    60    10
  •  STORAGE i      SANITARY AND SHIP CANAL         SOUTH
                          90   100    !IO   120   HO    110
                     NORTH CHICAGO RIVER         NOSTH SHORE CHANNE1
    RESERVOIR
                                  CHICAGO RIVER
                         MAINSTREAM SYSTEM
THOUSANDS Of HIT— 0
    STORAGE
                      30    40   SO    60    10    10    90    100   110    120    130   MO
                         DES PLAINES RIVER
                                                      0 HARE AREA
                                                                 PALATINE BRANCH
   RESERVOIR
                     DES PLAINES RIVER SYSTEM
                     i I! I I!  Ji
>    10    20   30    40
    NORTH BRANCH CHICAGO RIVER
OS   OS
CHGO   SOUTH
                        RIVER    FORK
  MAINSTREAM BRANCHES
i i ill il! :
3 34 35 37 31 <6
1
13 Oio . .
i

_. . _ .
~:B=~~-~^
_

|\* &,U

>-~—
7
«200
»100
0
-100
-200
-300
10   20
             10   05
                                                SALT CREEK BRANCH     ADOISON
                                                                        FEEHANVULE
                                       CREEK         DITCH
                    DES PLAINES RIVER BRANCI-
                        TUNNEL  PROFILES
                B~17          FIGURE   M-X-3

-------
-400
THOUSANDS OF FEET—-

     STORAGE
d      10

 HARBOR BELT
    RESERVOIR
   R.R.
 30    40

HARLEM AVE.
60     70     80

 CAL. SAG CHANNEL
90     100

LITTLE CALUMET
                                                             110
CAL.
                                                                  120
GRAND
                                                                                -400
                                             RIVER CALUMET
                               CALUMET SYSTEM
£ 3 ri ^ C > « ae •*= x te i
§ £ § £ o § £ I . £ S » £ "
C«SsaSs 3 s So "i
NOOENUMBW— 27 . 20 21 22 23 24 25 24 31 32 £ S
*WW
0
ci
o
z
5
5 -200 1
Cu
_i
UJ
-300
-400
THOUSANDS OF RET—


»S'
i i "•



_, 	
>lo. J
•MM^M*)"«



Silun
0' Dla
•««M^
„— '




n Dolomite
. U1 Dla.
-





••iwi^"*



~*~" "~^
' — 	 1
IS' Dla.
... , "
...i •


10 20 30 40
LITTLE CALUMCT RIVER

. .
1

i^~— -~~



15' Diet. 1

Glacial Deposics
~*
1

JO' Dio. «' Dia'
•^~^-~- ij ,1,1 -- 	 ~~~*mm~~f< U


1 10
VTERCONNECTIO
L. 	 _





1
20 30 40 50
* CALUMET RIVER
1- 	 . 	 ~
3
J
t
i
+100
0
-200
-300

                             CALUMET BRANCHES
                            TUNNEL   PROFILES
                                 FIGURE  M-X-4
                                       B-18

-------
               ENTRANCE
                CHAMBER
                       \
                                        VENT CHAMBER
CONNECTING PIPE
            WATER SIDE
                                     AIR SIDE
                                             TOP OF ROCK
                                            AIR SEPARATION CHAMBER
             TYPICAL DROP  SHAFT STRUCTURE
                         FIGURE  M-X-5
                              B-19

-------
          TUNNEL AND  RESERVOIR PLAN
                    }  Lfi  QlMHURST

                    \J-vrV/-
 A ON-LINE RESERVOIR
—ROCK TUNNEL

 • STORAGE
  RESERVOIRS
 a TREATMENT
  WORKS
                             B-20
                                                            NOV. 1974

-------
                                                    THE METROPOLITAN
                                                     SAWITARY DHSTR8CT
                                                    Of GREATER CHICAGO
GEN. USE AND WATER SUPPLY
GEN. USE ONLY
SECONDARY CONTACT
TREATMENT PLANT
                                                METROPO&JTAM  CHICAGO
                                  FIGURE   M-X-7
                           B-21

-------
                       APPENDIX  C
 THE METROPOLITAN SANITARY DISTRICT OF GruSATER CHICAGO

            POSITION PAPER ON SELECTION OF
          UPPER DESPLAINES SERVICE BASIN PLAN
            OVER OTHER SUGGESTED ALTERNATES

     The O'Hare Facility Area  (Upper DesPlaines Service Basin)
is a 58 square mile area in'the northwest region of the        '
Metropolitan Sanitary District. At present, all sanitary sewage
and the combined sewage finding its way into District inter-
ceptors through regulated control structures, is diverted
through existing interceptors to the District's Northside
Sewage Treatment Works for treatment. Initially, following
annexation into the District of most of the area in 1956,
it was planned to transmit sewage flows for the District's
northwest area to the West-Southwest Sewage Treatment Flant
in Stickney for treatment. However, further study indicated
the cost-effectiveness and desirability of dividing the north-
west area into four  (4) service areas. This Paper gives, in
detail, the planning history and rationale of dividing the
northwest area of which the O'Hare Facility Area is a part,
into four  (4) facility  (service) areas.

     Collection and treatment of sewage generated in this
basin has been the subject of many studies and reports. In
1961, the Sewer Design Section of the Metropolitan Sanitary
District recommended that the Northwest Intercepting System
be constructed to relieve existing sewers in the northwest
portion of the District to provide service for the ultimate
development of that area  (Ref.1). The northwest area comprises
the O'Hare, Salt Creek, Hanover Park and Poplar Creek  (Elgin)
Facility Areas as shown in Figure 1. The consulting firm of
Greeley and Hansen was-retained to investigate this proposal.
Based on their report, submitted in 1962, a tentative decision
was made to convey all sewage from the area to the West-Southwest
Treatment Plant  (Ref.2). Further investigation of this proposal
indicated that the cost and magnitude of the project would
require such time and resources as to necessitate construction
of temporary plants  in the northwest area  (Refs.1,2) . Additional
studies and investigations carried out primarily due to the
trend toward higher standards for disposal of treated effluent,
indicated the advisability of collecting and treating the
sewage from each facility area in the northwest area separately,
since construction of temporary tertiary treatment plants, of
the magnitude indicated, would not be cost-effective  (Ref.3).
Furthermore, the District considered that diversion of substantial
quantities of water  from the northwest area would not be conducive
to water reuse. The utilization of tertiary quality effluents  for
stream augmentation, within the area, was considered to have

                          c-i

-------
C-2

-------
environmental""and recreational benefits* '.The Northwest Inter-
cepting Sewer proposal would have diverted all cewaae flows
from the area for treatment at West-Southwe.it Treatment Plant
and treated effluent would be discharged into the Sanitary
and Ship Canal at Stickney.

     As a consequence, the Northwest Area was divided into
Facility Areas corresponding to existing drainage basins 2      l
Upper DesPlaines Service Basin, O'Hare Facility Area? Upper
Salt Creek Service Basin, Salt Creek Facility Area; Upper
DuPage Service Basin, Hanover Park Facility Area; and Poplar
Creek Service Basin, Poplar Creek  (Elgin) Facility Area.

     A preliminary design concept for the O'Hare Water Reclama-
tion Plant and intercepting sewers was prepared in report form
by Brown and Caldwell, consulting engineers, in 1968  (Ref.4)„
The contract plans for O'Hare Water Reclamation Plant have been
prepared by Consoer, Townsend and Associates, consulting engineers,
and are presently under review by the District. Preliminary  plans
for two  (2) collection facilities systems were prepared in a
report by DeLeuw, Gather & Company, consulting engineers  (Ref.5).
One system would divert total sanitary sewage flow only within
the basin to the O'Hare Water Reclamation Plant; the  second
system would convey all sanitary sewage to the plant  but would,
in addition, eliminate combined sewer overflows by collecting
and storing for treatment, all combined sewer overflows presently
discharging to waterways within the drainage area. They are
presently developing contract plans for the O'Hare Tunnel System
as part of the second system.

     In 1973, The Corps of Engineers published the Chicago-South
End of Lake Michigan Study  (Ref.6). The investigation included
the O'Hare Facility Area and the O'Hare Water Reclamation Plant
was defined in three of the five alternates presented in the
Report.

     Northeastern Illinois Planning Commission  (NIPC) included
the District's plan for the O'Hare Facility Area in  its  "Regional
Wastewater Plan" in 1971  (Ref.7).  This plan has been revised a
number of times since  (Refs.8,9,10,11,12) but revisions have not
affected the O'Hare Facility Area  except to include  the District's
Tunnel and Reservoir Plan as a regional solution to  the combined
sewer overflow problem. The first  three NIPC  Plan revisions  have
been certified by the State of Illinois and the Federal Government
in accordance with 40 CFR 35.565  (Refs.8,9,10).

     The review of the planning history indicates that the
division of the District's Northwest area into four  facility
areas is cost-effective and environmentally sound and has been

-------
recognized by NIPC,  the State of Illinois and the Federal Government.
The District's comprehensive plan calls for collection and treatment
of sewage within each facility area separately.   For the O'Hare Facility
Area, the District has planned a collection system designated as O'Hare
Tunnel System and a treatment facility, O'Hare Water Reclamation Plant.

     It is, therefore, clear that the selection of the Upper Des Plaines
Service Basin Plan over other alternates suggested was a sound judgment,
based on a number of detailed engineering studies concurred in by a multitude
of governmental agencies.  Based on the results of the studies and
concurrence of the applicable regulatory and planning agencies, as well
as the majority of the affected communities, decisions have been made and
actions taken over a number of years which weigh even more heavily in
favor of continuing the proposed course of action as expeditiously as
possible.  The initiation of new studies and reconsideration of numerous
alternates suggested by individuals untrained in the relevant fields of
endeavor and uninformed in the history of past decisions and the multitude
of facts and data drawn upon in making these decisions is unwarranted.
                                C-4

-------
               REFERENCES;

                   1.     MSDGC,  "Recommendation for Site Acquisition
                         for Additional Sewage Treatment Plants for
                         Northwest Section, of Cook County, Salt Creek
                         and DesPlaines River Areas," Juna 25,, 1964
 «
                   2.     Greeley and Hansen,"Proposed West and Northwest
                         Sewers," MSDGC, 1962

 *                 3.     Greeley and Hansen, "Report for Northwest Area",
                         MSDGC,  1968

                   4.     Brown and Caldwell, "Design Report, O'Hare Re-
                         clamation Plant", MSDGC, 1968

                   5.     DeLeuw, Gather & Company, "Preliminary Plans for
                         O'Hare Collection Facility", MSDGC, 1972

                   6.     Corps of Engineers, "Chicago South End of take
                         Michigan Study", Chicago District, 1974

                   7.     Northeastern Illinois Planning Commission,
    ^                    "Regional Wastewater Plan", March, 1971

                   8.     Northeastern Illinois Planning Commission,
                         "Regional Wastewater Plan", Revised September, 1971

                   9.     Northeastern Illinois Planning Commission,
                         "Regional Wastewater Plan", Revised October, 1971

                  10.     Northeastern Illinois Planning Commission,
                         "Regional Wastewater Plan", Revised January, 1972

                  11.     Northeastern Illinois Planning Commission,
                         "Regional Wastewater Plan", Revised July, 1972
i
• *                12.     Northeastern Illinois Planning Commission,
                         "Regional Wastewater Plan", Revised October, 1972
                                         C-5

-------
                      APPENDIX  D








 BKDHOCKGEOLOGY




        This description of the general beclrork neologir conditions





 in the study area, is complemented by the analysis of field borings





 as  reported in The Geotechnical Report on the Upper Des Plaines





 Tunnel and Reservoir Plan, Volume 1,  Bedrock Geologic Investi-





 gation, 1974, De Leuw,  Gather & Company.




       The limestone and dolomite rock units, together with the





 hydraulically interconnected overlying glacial drift,  function as





 an aquifer.




        Rocks in the  project area date back to the  Upper Ordovician





 Period.  They consist of mudstones,  argillaceous dolomite, pure





 dolomite and unconsolidated or semi-consolidated glacial deposits.





 Stratigraphic hiatuses (disconformities) occur between Middle Silurian





 and Pleistocene, and between the Lower Silurian and Upper Ordovician





 age rocks.  Local lensing may totally remove some rock units




 (Waukesha Formation).  See Exhibit  II-1.




       The lowering  of sea level which produced the disconformity




at the end of the Ordovician period resulted in local valleys cut  as




much as 150 feet deep in the underlying mudstones.  With the re-





advance of the sea, these valleys were subsequently filled with




the shaley dolomite of the Edgewood Formation, which was  not






                           D-l

-------
System
) QUATERNARY
I
I
Series
Recent
|
Q^
Niogoron
/
Alexandrian
Cincinnatian
I
Formation/Member

WADS WORTH
MEMBER
WEDRON
FORMATION
*" I 	 . 	 	 _ ' 	 •'-! •
RACINE
(O -3OO')


(WAUKESHA)
(0-20')
JOLIET
(4O-7O')

Romeo
Markgraf
Brandon
Bridge

KANKAKEE
(20-50')
(EDGE WOOD)
(0-100')
1
& BRA
o SH
* in
.Jl ( L/
1

(0-15')
INARD
ALE
100')
Base
Column
&$
^•uC
'/"*'
/
'*&

^
desert
Description

Till and outwash deposits. Clayey silt with
sand lenses. (Grovel lenses possible but not
probable - described in soils report. )
Bouldery till, clayey silt with sand lenses,
gravel ' boulders common near base and at
unconformity. (Described in soils report.)
Gray-brown, argilloceoustfine groined,
thin bedded dolomite containing reefs
of pure, grayi, massive, vuggy, dolomite.
Gray, fine grained, silty dolomite.
(Generally absent in northern area.)
Light gray, pure, porous dolomite.
Light gray, silty, very fine grained dolomite
Red or greenish gray dolomite and
interbedded shale.
Light brown, fine groined dolomite with
prominent wavy clay partings.
Brown to gray shaley dolomite.
(Cherty near top. Not recognized in
project area.)
^J~/TV~ "— *^~ "—£ "~T~ .^***> a,*"" '"•""". "*~ •— " "-*• ' —
— C/oiire ona rea snale (Generally absent /
Oolite and red shale. (Generally absent)
Green to brown fossiliferous mud stone.
bed
STRATIGRAPHIC SEQUENCE
              D-2

-------
recognized in any of the rock cores recovered during the explorations




reported herein, but which may exist in local areas of the project.




       The stratigraphic sequence used  in this report has  been




developed from rock cores taken along the project alignment.




No surface rock exposures are available for study.  The rock units




used follow as closely as possible formational units as described in




the literature (Willman,  1971  and 1973), but vary somewhat in the




designation of formational member units as the contacts between




member units are gradational and thus subject to  personal judgment.




 Bedrock Surface





       The bedrock  surface is covered by glacial till throughout




the project area; the bedrock  contours shown in Exhibit II-2 are based




totally on interpretation of boring data and are generalized.  The
                             D-3

-------
      LEGEND
           Sjr  ROMEO


           Sm  MARKGRAF
           Sbb BRANDON  BRIDGE


           Sk  KANKAKEE


           Ob  BRAINARD SHALE
           Faults


           Formation Contacl
                                                                                      EXHIBIT il-2
NOTE  I.  ELEVATIONS IN  FEET AND
        BASED ON C.C.D (CHICAGO
        CITY  DATUM )

      2  FAULTS  REPORTED BY VIBROSEIS
        SURVEY.  HARZA  ENGR. CO.
                      CONTOURS  ON  TOP  OF  ROCK
                           AND  BEDROCK  GEOLOGY
                                                                               D-4

-------
bedrock relief in the project area is  over 60 feet.




        The rock units at the till/rock contact are the Niagaran




age dolomites of the Racine and Joliet Formations.  The top of




rock surface is usually broken and open for five to ten feet and




occasionally carries significant quantities of water.




Stratigraphy




        A detailed discussion of the stratigraphy of the study




area can be found in the Foundation Science Report,  A Geotechnical




Report  on the Upper Des Plaines Tunnel  and Reservoir Plan,  pre-




pared for De Leuw,  Gather & Company.




Structure




        The geologic structure described in this report is based




solely on interpretation of boring data.  No exposures of bedrock




are available  for study in the project area.  Therefore, the




situation presented in maps and sections must be used in its




broad diagrammatic sense only.




        Faults.  A number of faults of ten to 30 feet vertical offset




are postulated.  The  faults are interpretive and have not been




physically observed,  but they do further  explain stratigraphic




facts developed by the boring  program.  None of the  borings




actually intersected  a major fault zone.   In many cases,  strati-
                           D-5

-------
graphic offsets of a single fault are probable — the result of more





than one fault of smaller proportion stair-stepped to produce the





total offset.





       With borings spaced at. 1,000-foot centers,  as in this





program, it is also possible for fault blocks of greater  or lesser





proportion than those shown  to exist between borings and not be





represented on geologic maps and sections.  The general structural





trend for faults is expected to be NE-SW and NNW-SSE.  The actual





fault trends indicated on the  accompanying map are interpreted from





apparent bedrock drainage displacements and may  or may not in





fact represent actual conditions.





       Three angle borings were drilled to try to sample a fault





zone.  No significant amounts of faulted or gouged rock could be





identified in any of these holes although a few core loss zones





occurred which may represent small shear zones.  However, the




rock on either side of the core loss zones  does not appear bisected





as might be expected if a major fault zone were nearby.





       The Des Plaines Disturbance.   The project is immediately





west of a geologic anomaly known.as the Des Plaines Disturbance.





This disturbance is a five- and one-half-mile-diameter area having





a very complex system of higk-angle faults.  Fault displacements
                          D-6

-------
along the edges of the disturbance range from *iO to 300 feet,  and




in the interior reach 900 feet.  Thus, faulting may be aptly described




as severe, and the fault system may be expected to extend some




considerable distance away from the boundary of the  disturbance.




Shear zones associated with the fault system would cause support




problems and would yield high volumes of water.  Because of the




anticipated areal faulting, water infiltration problems would prob-




ably be severe.  Also,  because of the offsets across individual




faults, it would be difficult to avoid the contacts between rock




members,  again adding to water inflow and support problems.




        Jointing.  Joints, although not  numerous in the rock,  have




a significant influence on its  permeability and local tunnel stability.




The open joints act as a  conduit to  carry groundwater from the




overlying glacial till to  the bedding planes in the upper rock units




(Racine and Joliet Formations).  The numbers of the open joints




are relative indicators of the amount of groundwater to be




expected in a given rock. These data  clearly demonstrate the




more open and permeable natures of the Racine and  Upper Joliet




(Romeo) Formations.
                             D-7

-------
       Earthquakes.  In the past, damage from earthquakes has





not been extensive or severe in Northern Illinois.   Past disturbances





have ranged in intensity up to VII on the Mercalli scale, but a VII





intensity was  recorded only once in history.  Presently, the study





area is in Seismic Risk Zone 1,  an  area predicted to experience





only minor damage from earthquakes that have the  epicenters





outside the state.  Intensities of the disturbances are predicted





to range  from V to VI on the Mercalli scale.  A V intensity distur-





bance is  felt by nearly  everyone and breaks glassware and windows.





A  VI intensity disturbance is felt by everyone; objects are upset;




and chimney and plaster damage occurs.






SOILS AND SURFICLAL GEOLOGY




       The basic drainage patterns, landforms and soil parent





materials are related to the Wisconsin glaciation.   Glacial deposits





may approach depths of 60 feet in this area.   The textural  composi-




tion of these morainal till deposits  range from clay to  clayey silt,





with varying amounts of sand, gravel and boulders.  At the earth





tunnel depth,  the soils range from  clayey silts to silty clays, with





occasional  sand and gravel.  In this area,  the  Tinley Moraine





directly overlies the Valparaiso Moraine.  The Tinley Moraine,





predominately a silty clay,  may contain  waterbearing sand layers.
                             D-8

-------
                                                  APPENDIX   E
REGIONAL WATER RESOURCES AND NEEDS

SECTION A

Sources of Water Supply

2.01 GENERAL  At  the  present  time,  Lake  Mkhigan  and
groundwater  are  the  sources for public water s apply in north-
eastern Illinois. Grouudwater is developed from  four aquifer  sys-
tems: 1) sand and gravel  deposits in the glacial  drift; 2) shallow
dolomite formations; 5) the  Cambrian-Ordovician aquifer; and 4)
the Mt. Simon aquifer.  For purposes of this report, the sand  and
gravel  deposits and the dolomite formations are collectively  re-
ferred to as the shallow aquifers,  while the Cambrian-Ordovician
aquifer Is referred  to  as  the deep sandstone aquifer.  The  Mt.
Simon  aquifer is  considered separately and  discussed to  a lesser
degree because it is virtually unused at present.  While there  are
several surface streams flowing through the region, only the Kan-
kakee River has been  seriously considered  as  a  source of public
water supply.

2.02 LAKE MICHIGAN   Lake Michigan is the most extensively
used water source.  It provided  1,105 million  gallons per  day
(MGD) for public  water  supply in 1970, or about 85  percent of
the region's total public water  supply needs.(l) From a purely
physical standpoint, the Lake offers an almost limitless  amount of
water that can be  readily treated  to  acceptable  drinking  water
                                                     quality.  It should be noted that no water flows naturally from
                                                     the T>ake to !nn region.  That wuich is withdrawn for water supply
                                                     arid father  p irposes cun*iltute» fi diversion,  Currently, this diver-
                                                     sion ,,, iiiinlcis to 3,201) cubic h-i ( per second (efs), or about 2,080
                                                     MOD, as a result  of a 1967 II.S  Supreme Court Decision.

                                                       The Cit) of Chicago in the largest user of Lak« Michigan water,
                                                     withdrawing s^rnounts to meet :
-------
the entire regional aquifer system.)  Extensive surScial sand  and
gravel deposits are  found  in  parts of  DuPago,  Knne,  Lake,
McHenry and  Will counties, while  deeply buried  deposits  nre
found  widely scattered throughout Kane and McHenry counties,
western  Lake  County,  northeastern  Cook and  DuPage  counties
and central  Will County. Generally,  the greatest chance  for  JUG-
cessful well penetration  of a productive water yielding sand  and
gravel formation is within subsurface  vaile5's cut into the  bedrock
by  preglacial and  glacial geological processes.

  Because  of  their irregular occurrence, the  sand  and gravel
aquifers  are more  difficult to locate than tho deeper, moro exten-
sive sandstone  aquifers.  They are also moie difficult to  develop
for  large water  supply systems since they are more directly affected
by  the vagaries of rainfall  and  drought.  On (he  other  hand.
the glacial drift aquifers are generally more  rapidly recharged,
are more permeable than  the deep  aquifer;;, and  involve  lower
drilling costs.  Locally  they  provide  good sources  of supply to
municipalities and  private individual users, with some wells  yield-
ing in excess of 1,000 gallons per minute  (gpmV  In 1970,  ap-
proximately  31.4  MGD  were pumped from  the sand and gravel
aquifers in the six-county region.  This amounted to approximately
Figure 2-2  Area of High Yield from the
              Shallow Dolomite Aquifer
12  pei cent of the estimated total groundwater pumpage in that
year, which was 261.2 MGD.(2)

  The hardness content of raw  water is  extremely variable but
usually ranges between 100 parts pur million (ppm) and 450 ppm.
The iron content which can  affect the taste,  appearance and use
of  water averages about  2 ppm and  is higher than that  of the
deep  aquifers and Lake  Michigan.  Water temperatures average
about 52 degrees, which is considered to be cool and refreshing.

li.  Dolomite  Aquifer   Underlying much of the region  at  depths
varying fiom frround surface  to 450 feet deep is the shallow dolo-
mite aquifer.  In this  aquifer groundwater is found in joints and
fractures,  and  it moves  through an  interconnected network  of
these  openings.  Since  these water-bearing cavities  are unevenly
distributed both  hori/ontally and vertically, the  yields  of wells
drilled into the  dolomite  vary greatly  from place  to place. Suc-
cessful development for water supply  depends upon a well inter-
secting a large, water-filled fracture which is capable of sustaining
he.ivy pumpage  
-------
occurs In western Kane and McHenry counties, most takes place
in areas outside of the metropolitan region,  including  Kendall,
Boone and  DeKalb counties of  Illinois,  and in certain  areas  of
southeastern Wisconsin.  It  is important that future urbankntion
and  land use  in those areas  not  have an adverse impact on
recharge.
  The Cambrlan-Ordovician aquifer is the most heavily pumped
aquifer in the  region; it furnished  approximately 53 percent  of
the total groundwater used in 1970.  Since 1958, withdrawals from
this aquifer have exceeded  the practical sustained yield,  which is
defined as the maximum amount of water which can be continu-
ously withdrawn from existing pumping centers without eventually
dewatering  the  most productive  unit (i.e., the Ironton-Galesville
standstone). The  practical sustained  yield  of  the  Cambrian-
Ordovician aquifer has been estimated at only 46 MGD. Pumpage
data for 1970 indicates that actual withdrawals approximated 139
MGD, or about  three times  the estimated sustained yield.(5)  This
withdrawal  of water at rates in excess of natural recharge (termed
"mining") has  been reflected by a progressive decline  in water
levels, increased pumping lifts  and increases in  pumping costs.
During the  period 1966-1971, annual water level declines in wells
in the Cambrian-Ordovician aquifer  averaged nine feet.

  Table 2-1 lists the increases in pumpage from the deep sand-
stone aquifer during the period 1966-1971.

TABLE 2-1: PUMPAGE FROM  DEEP WELLS IN NORTHEASTERN
             ILLINOIS,  1906-1971 (IN MGD) (8)
Public
Supplies
County
Cook
DuPage
Kane
Lake
McHenry
Will
Total Region
1966
31
11
23
2
2
12
81
1971
42
16
26
5
2
14
105
Industrial
Supplies
1966
24
1
3
1
1
16
46
1971
17
1
2
2
1
11
37
Total
1966
55
12
26
3
3
28
127
1971
59
17
28
7
3
28
142
While industrial pumpage declined over the five-year period, total
pumpage actually increased 15 MGD as a  result of greater with-
drawals for public supply. Particularly noticeable are the increases
in public pumpage in Cook and DuPage counties.

   Despite the problem of overpumpage, the Cambrian-Ordovician
aquifer will continue to be an important source of supply. Water
in this system is naturally free of bacterial pollution. The hardness
content is from 200 to 250 ppm in the northwest part of the region,
and increases toward the east as the aquifer  increases in depth.
The iron content of  the water is  usually less than 0.4 ppm. Tem-
peratures range from 54 to about 62 degrees and  increase with
depth. The Cambrian-Ordovician aquifer is generally well suited
for large, municipal  water systems; yields in excess of  1,000 gpm
have been recorded.  Mining of this aquifer cannot be continued in-
definitely. Eventual  provision must be  made  for transfer to an
alternative or supplemental source in areas where water levels and
well yields are declining.

2.05  MT. SIMON AQUIFER  The Mt. Simon aquifer underlies
the Cambrian-Ordovician system  and is the  deepest in the region.
The top of this aquifer ranges from 1,400 to 1,600 feet below the
ground surface in  the northwest,  and from  2,200 to 2,400 feet in
the southeast. Its  average  thickness is approximately 1,600 feet,
with the materials consisting primarily of fine to coarse  grained
sandstone. The cleaner parts of the sandstone yield moderate quan-
tities  of  water, although the  aquifer's potential  is  limited by a
number of factors. The nwt si'piiHcant limitation is brackish watei
beginning at depths below l.C'JO feet mean sea level, necessitating
costl>  ttjatment prior to  use. The  aquifer also  is not consistently
permeable.  Furthermore,  deep and expensive wells are involved,

  The practical sustained yield of the Mt,  Simon aquifer has been
estimated at 14 MGD, although development of this  source ha,<
been virtually nonexistent to d-ae, In 1973, the Illinois State Watei
Survey completed a feasibility study of deveioping and desalting
water  from  the Mt, Simon ac.jifer. Reverse  osmosis and freezing
processes were considered f.1? ible  for 1 MGD capacity treatnienl
plants, while distillation was Considered feasible for 5 MGD plants
Costs  (including welL, transmission lines, desalting facilities and
brine disposal)  ranged from  $1,33/1,000 gallons  for  a  1 MGD
reverse osmosis plant to $1.85/1,000 gallons for a 5 MGD distilla-
tion plant.

2.06  SURFACE WATER RESOURCES  Unlike many  other large
metropolitan areas, no inland lakes, rivers or streams are presently
used for  public water supply in  northeastern  Illinois. There  K
however, substantial industrial use  of witer from the Sanitary and
Ship Canal, the Calumet River, the  Des Plaines  River and, to  a
lesser extent, the Fox River.

a.  Limitations  There are several factors which  have mitigated
against the  use of surface watercourses. Certainly one  reason  (ai
least until  recently)  has  been the  readily  available  supply  of
groundwater which could be developed at low cost. But the major
deterrent has been the general poor quality of the region'^ surface
waters, a problem  which  necessitates  thorough,  expensive treat-
ment. While water treatment technology has advanced to the point
where virtually any water can be made potable, the cost  of such
treatment may be excessive, especially when compared with the
cost of developing alternative sources. Waterways such  as the Des
Plaines River have been  discounted as viable sources of municipal
water  supply because of their lack of dependable flow, high con-
centrations of bacterial and viral organisms, high solids and heavy
metals content, and undesirable tastes and odors.

  Nevertheless, the suitability of these waters should be periodi-
cally reevaluated in light of  changing needs and conditions.  As
improved methods of wastewater treatment are employed and  as
nonpoint sources of pollution are reduced, surface waterways may
become economically feasible  and attractive water sources. In the
interim, greater attention could be  given to increased use of these
waters for non-domestic purposes  whenever possible in order  to
alleviate competitive pressures on water resources which are suit-
able for public supply.

b.  Kankakee River  It should be noted that the  Kankakee River
is an exception to the foregoing discussion and does offer potential
for  development as municipal supply. The river's raw water quality
is reasonably good, and its large flow volume would eliminate the
need to construct  expensive storage reservoirs.  In addition, it  is
proximately  located to the Joliet area where there is concern for
the  long-term availability of groundwater.

c.  Fox River  At the present time it is not advisable  to  use the
Fox River for  domestic  purposes since a  high  percentage of its
flow consists of wastewater treatment plant effluent which presents
a risk  of  viral  or chemical contamination. (7)  However,  the Fox
River may offer some  potential  for future use as a public water
supply. Indeed, state water quality  standards have designated the
river for "domestic and food processing water supply,"  and pollu-
(5): Ref. 2
(6): Ref. 4, pg. 8
(7): Ref. 5
                                                                E-3

-------
Hon  abatement efforts necessary to achieve that standard are un-
derway. After the desired level of water quality has been attained,
the river might be  used for this  purpose. One possible approach
would be to reduce deep well pumpage in the Fox Valley area to
the rate which  can  be sustained without  mining. Demands  which
could not be satisfied by proundwp.ter  under this condition could
be compensated for through  withdrawals from the river.  During
seasonal low streamflows, well pumpngc could be increased beyond
sustained  yield  on  a  short-term  basis  until  normal flows are
resumed.

d. Other Streams   Finally it  is significant to note that while there
are a large  number of  tributary  streams in northeastern Illinois,
few  present  public  water supply opportunities. In  addition to
quality problems, frequent periods of low flow would necessitate
the construction of storage reservoirs,  a  condition for which the
topography of this region is poorly suited. There are also problems
of leakage in these reservoirs through permeable surficial materials
or fractured  bedrock, and excessive sedimentation.   Sites  which
have been identified as being  potentially suitable for water supply
reservoirs are discussed  in Appendix D.
SECTION  B

Water Supply By County

2.07 GENERAL  This section contains  summary descriptions  of
water supply conditions in each of the six counties in the region.
Particular emphasis has been placed on groundwater, since areas
now supplied by  groundwater  are  expected to  face  the most
serious problems in both  the immediate  and distant  future. The
groundwater data  used  in this section  were  furnished  by the
Illinois State Water Survey; the information is  thought  to be the
most  accurate  presently  available.  Total  pumpage  figures are
cited, including amounts used for the following purposes:  public
(which includes municipal, -subdivision and institutional);  indus-
trial;  domestic; irrigation;  and livestock.  The  amounts used for
the last two purposes  are difficult to  quantify and are  not thought
to be substantial. Estimates of the potential yields of  the shallow
aquifers in each county were also made by the Water Survey.

2.08 COOK COUNTY  Lake Michigan is the predominant source
of supply  for Cook County. The City of Chicago withdraws  water
from the Lake to supply its own needs and in addition furnishes
water on a  contractual basis  to a number of suburban communi-
ties. In 1970, the City provided an average of 1,035 MGD  to
supply 4.52 million people in its service area. There are six other
independent municipal systems located  along  the north  shore
which withdraw Lake water. Lansing, in the southeastern part  of
Cook County, obtains Lake  water  via the  Hammond, Indiana,
system.

  A significant portion of Cook County is  supplied with ground-
water. In  1970, pumpage  amounted to 99,6 MGD, which was ap-
proximately 38 percent of the six-county total groundwater  pump-
age of 261.2 MGD in that year. Of the 99.6  MGD, 59.6  MGD
(60 percent) were taken from the  deep  sandstone aquifer, 36.4
MGD  (36 percent) from the  dolomite,  and 3.7 MGD  (4 percent)
from the shallow sand and gravel.

  Deep sandstone pumpage in Cook County is more than twice
that in any other  northeastern  Illinois county.  Water well  levels
have declined in response  to heavy drawdowns, particularly in the
northwest and southern portions. There is also significant pumpage
from  the shallow  aquifers,  especially  in  the  southern  sector.
Chicago  Heights,  and to  a  lesser  extent  LaGrange, have been
identified as areas where pumpage has exceeded recharge. County-
w'de, the estimated shallow aquifer potential yield is  98 MGD.
2.09 DU  PAGE COUNTY  DuPage  County  is supplied exclu-
sively with  groundwater, and  pumpage in  1970 averaged  51.7
MGD. The dolomite accounted for 33.9 MGD of the total with-
drawal (66 percent), while the deep sandstone yielded 15.5 MGD
(30  percent)  and  the  sand and  gravel aquifers 2.3  MGD  (4
percent).

  There  is considerable concern  for the long-term  adequacy of
groundwater supplies in D'iPage  County. The potential yield of
the sand  and  gravel and  dolomite aquifers is estimated at  42
MGD and by 1972, pumpage from these aquifers had increased to
39.7 MGD. In  some  areas  (most  notably  in the vicinities  of
Hinsdale.  Clarendon  Hills, Addison,  Downers Grove, Wheaton
and Glen  Ellyn) the dolomite is already being pumped in excess
of recharge, and there has  been permanent lowering of the water
table and  reductions in  well yields.  In  an effort to compensate for
these declines,  increased numbers of  deep  sandstone wells  have
been drilled. Extensive mining is being practiced, and water levels
in the detp wells have been declining steadily for several years.

2.10 KANE COUNTY  Kane  County  is supplied primarily with
groundwater, although  there is some minor  industrial use of the
Fox River. The  western  two-thirds  of  the county is  largely rural,
and no  particular water supp'.y problems are  being  experienced.
However, in the  more  urbanized  Fox River  Valley area, the
Cambrian-Ordovidan aquifer is heavily used,  and  steady water
level  declines  have been  observed,  particularly  in  Aurora  and
Elgin.

   The importance of the deep  sandstone aquifer is  illustrated by
ihe fact that it  provided 27.9 MGD (or 74  percent)  of the 37.5
MGD total  pumpage in 1970.  The sand and gravel  and shallow
dolomite aquifers produced 6.S! MGD (17 percent) and 3.4 MGD
(9 percent) respectively. Their potential yield  is estimated as 31
MGD, which is  the lowest of the six counties.

2.11  LAKE COUNTY  Lake Michigan is the primary source of
supply in eastern Lake County, while  groundwater is  used in the
central and western porlions. In terms  of total groundwater pump-
age, development  of  the  three  aquifer systems has been ap-
proximately equal. According  to  1970 pumpage figures,  with-
drawals amounted to approximately 19 MGD. The sand and gravel
aquifers produced 6.9 MGD (36 percent) of  the total, followed
by 6.1 MGD (32 percent) from  the dolomite  and 6.0 MGD (32
percent) from the deep sandstone.

   Water  level  declines in  the  deep wells are being  experienced
in certain areas  (primarily Libertyville and Mundelein), although
this situation  is not  as severe  as that in Cook  and  DuPage
counties. There  appear to be considerable opportunities for greater
development of  the shallow aquifers, where potential yield is esti-
mated at 51 MGD.

2.12  MC HENRY COUNTY   Of the six counties, McHenry is in
the most favorable position with respect to water supply. The sand
and gravel aquifers are by far the predominant source and their
use is increasing. They supplied 9.4 MGD (or  63 percent) of  the
county's 15 MGD total pumpage  in 1970. By way of contrast,  the
deep sandstone produced 3.0 MGD (20 percent) and the dolomite
produced 2.6 MGD (17 percent).

   It is significant that the combined potential yield of the  shallow
aquifers is estimated at 96  MGD. Thus, while the shallow aquifers
provided 12 MGD (or 80 percent) of McHenry County's total 1970
groundwater demand, this  still  amounted to only about 13 percent
of  the total quantity  potentially available  to  the area from  the
shallow system.
                                                             E-4

-------
                                                                     APPENDIX F
raising Lakes  Michigan and Huron  by 4.4 inches, exclud.'ng the
effects of the  Illinois diversion.  The effect of the present Thinois
diversion  (exclusive of the diversion  into Lake Superior)  i<; to
lower Lukes Michigan nnd Huron 2.7 inches. The net effect or.
these in-ancl-oiit diversions is to  raise the  levels of Lake Michi£»n
and Lake Huron by 1.7 inches, To put  this in perspective, artificial
diversion  Into  the Great  Lakes presently  exceeds diversion out of
the Lakes by  approximately 1,800 cfs. It therefore would appear
that diversion by  Illinois  could  be increased  without having any
critical effect on the Great  Lakes  Basin as a whole. Indeed, su?h
an  increase would allow a better inflow-outflow  balance  to be
achieved.


SECTION  C

Groundwater Mining
8.12  GENERAL  There  are two basic approaches to groundwater
development. The first regards  aquifers only as  systems through
which water moves, and  favors limiting  well withdrawals to the
practical sustained yield. The second approach, mining, favors con-
tinued withdrawal of  water from the aquifers at  a rate  which
exceeds that of recharge. At  the  present time, approximately 96
MGD of the 142 MGD pumped from  the deep sandstone aquifer
in this region are mined.

8.13  ADVANTAGES  AND DISADVANTAGES   Mining is  a de-
batable issue.   The most  common argument  against the practice
generally has been that since it removes water held in storage, it
deprives future generations  of the right to obtain  adequate water
at low cost. The extension of this reasoning is that present pumpage
ought to be reduced to sustained yield, with any deficiencies  to be
made up through die development  of alternative supplies, including
remote surface sources. In this way, water held in aquifer storage
would be kept  in permanent trust  for future use.  The counter
argument in favor of mining is  that the water in storage is  of no
value unless it is  used.  In addition,  mining  allows  large capital
investments in surface water supply projects  to be  deferred to a
later date. In  the  interim, changing technologies and alterations in
water use patterns conceivably could reduce the need for importing
large quantities of water.

  One of the central objectives of  water management is to provide
adequate service  with  the maximum net benefit to all. Clearly, if
the same benefits  can be  derived from any of several alternatives,
the least cost  alternative  will result in the maximum net benefit.
Since the cost of mining water is usually less than  the cost of
obtaining water from  an outside  source,  it follows that mining
may need to be conducted  until it is no longer economically fea-
sible, at  which time the  next "lower  cost" source would be de-
veloped.

  There  are a  number of other reasons why  mining of the  deep
sandstone aquifer might be continued on a managed basis in north-
eastern  Illinois. First,  if  mining  were not  practiced  and  with-
drawals  were  limited to  the  rate of recharge,  a  number of
townships in the region  would  become deficient  in  groundwater
by  1980.  Given existing  legal  limitations on diversion  of  Lake
water, these deficiencies  could not easily be satisfied by  importa-
tion  from that  source.   Furthermore, considering  the  existing
investment in wells and pumping facilities, coupled with the  large
amount of water  held  in  aquifer storage, it may be  expedient to
continue or accelerate mining, at  least on a short-term basis. It
should also be noted that the dewatering of the aquifer as a result
of  mining probably  would not  cause serious  damage  to the
aquifer's  water storage or transmitting  properties. Indeed, if after
a period of mining, pumpage were reduced to  sustained  yield,
water levels would rise and the capacity of the aquifer to  transmit
water would eventually return to its original state.
Water Conservation, Pec's.\r;e, and Recycling

8.14  GFNERAL  One, mean* of !i,-lplng to avert water shortages
is to institute watfi conserv, lii :>  .:n'v.iti,m j*"-u.v>res '  nplc.> i< clinical, eco lomic, educa-
tional  or Segui  '.ioK  o t->ntr< > waU'i  ir;uge in such  a way  as  to
balance  it  with  sirppt .  Rt•<•; i img  stacks 10  maximize  the me
potential of ,iny  givoii quant^y  of  water. The primary objective
of both of these appioarhes  :s  to  man.'ge existing sources  more
efficiently and  effectively  as an alternative  to   developing  new
sources.

8.15  WATER  CONSERVATION   TECHNIQUES   A  detal-d
discussion of water  :-oiiServUion  (paiticularly  domestic conserva-
tion techniques)  is contained in  Appendix E. That which f<:llovs
is primarily concerned with  water  metering and  leakage control
with brief attention given to reduction  of in-house water  watle.

a.  Metering  Metering watet consumption is one method of en-
couraging thrift and normalizing water  demand in a  community.
Metering allows consumers to be  charged according to the amount
of  watei  they  use,  thus  providing  an  economic  incentive  to
minimize waste. For example, greater use of meters has been cited
as a contributing factor to the reduction in per capita  consumption
in the City  of Chicago, where average water use decreased from
302 gpcpd in 1930 to 249 gpcpd in 1972.

  Metering  is regarded as one of the most fundamental  precepts
of  modern  water management.  Yet,  a  number  of public water
systems in the region do  not meter  consumption and prefer  to
charge a flat rate  for water provided regardless of the amount used.
With  a flat rate system in  operation, there  is virtually  1:0  eco-
nomic incentive for  consumers to practice water conservation.

  It must be recognized that the  cost  of purchasing, installing,
maintaining and reading water meters is substantial. Thus, it may
not  be economical  to  meter all water  users  that are presently
unmetered, particularly in light of the relatively low rates charged
for water in most communities. However, as water becomes a
more valuable  resource in the future, greater metering (at  least
of new and  large users) will probably be practiced.

b.  Control  of  Leaks   Leakage  from water  distribution systems
can create a substantial demand on water supplies without  pro-
viding any corresponding benefits.  Excessive leal age  reduces the
amount of water available for  domestic  purposes and increases
overall costs. A number of factors  influence  leaks, including: age
of the system; materials used in  construction; physical and  chem-
ical properties  of the  soil; properties of  the water; pressures in-
volved, and the degree of proper maintenance.

  While no system  is absolutely  tight  and some leakage  will
inevitably occur,  leaks should be reduced to the greatest practical
degree. In the construction of new distribution facilities or  in the
replacement or addition to older facilities, leakage control can be
achieved through proper sealing of joints and testing for tightness.
Control in existing systems can  be  achieved through  an  ongoing
detection  and correction program.  However,  the  savings derived
from  such a program  must be balanced against  the  costs of its
operation. Total elimination is seldom  justifiable economically, but
it can proceed to the point where  the cost of salvageable water lost
equals the cost of a repair program. Any additional rehabilitation
beyond this point would not be economical since the cost of repair
would exceed the incremental benefits  derived  from the  water
savings.

  The appropriate magnitude of a  leakage detection and  repair
program is thus dependent upon a  number  of factors, the  most
                                                                        F-l

-------
important of  which are: the rate of loss  of salvageable  water
within the system; the cost of supplying water, and  the cost of
system maintenance and repair.  Individual communities  contem-
plating a leakage control program should evaluate their particular
systems in light  of these conditions  to  determine tiie extent of
corrective action warranted.  Those having  serious leakage prob-
lems  may benefit considerably  from  inci eased water  savings,
especially if  water costs are high or supply  is inadequate  Con-
versely, communities that have relatively miror leakage problems,
low water costs and abundant supplies probably need not under-
take extensive control programs.

c.  Water Conservation in the Home   Several steps can be taken
to  reduce water consumption and/or waste  in and  around the
home.  Maintenance and  repair  of leaky  plumbing  fixtures  can
save large quantities of water  over time which otherwise would be
lost. Use of water conserving  devices such as shallow  trap toilets,
washing  machine  "suds savers"  and  Restricted flow showcrheads
can also reduce  in-house water  consumption. Substantial reduc-
tions can also be effected by taking care that lawns are not over-
watered and that  too  much water is not used for such activities
as washing automobiles. Conscious efforts to  eliminate waste not
only conserve  water but also result  in  economic savings in the
form of reduced water bills.

8.16 ARTIFICIAL   RECHARGE  Intensive  development  of
groundwater  has created considerable interest in the possibility of
artificially recharging  the aquifers.  Replenishment of  water in
areas of concentrated pumpage,  if feasible, would reduce the rate
of water level decline and  improve the  yield capacity  of wells.
Consequently, the lives of existing wells could be prolonged and
the aquifer could continue to  provide a dependable water supply.

a.  Sources of Recharge Water  The most readily available source
of water for artificial recharge is  the seasonal  high flow in  surface
streams.  The  diversion of high  flows from stream channels for
artificial  recharge  would also make  available  additional  storage
space in  these channels for the temporary storage of flood peaks.
Sophisticated stormwater drainage systems provide efficient means
for the collection and  temporary  detention in  basins of water that
also can  be  used for artificial  recharge of the shallow  aquifers. If
the highy polluted initial flush from urban  areas is bypassed, the
remaining stormwater, if treated, may be suitable for artificial re-
charge.  However, the  feasibility  of this technique needs  to be
more thoroughly investigated.  Other  possible sources include cool-
ing water, certain  industrial wastewaters,  and conceivably, heated
domestic wastewater.

b.  Methods   The three principal methods  of direct artificial re-
charge are  water  spreading,  seepage  pits  and  injection  wells.
Induced infiltration from streams  caused by  pumpage from nearby
wells  is an  indirect method  of  artificial  recharge. Whatever the
method,  artificial  recharge  requires  agencies  and facilities  to:
obtain, treat (if necessary) and transport  the water to the recharge
area; infiltrate or inject the water; and provide for the disposal of
any excess water. The development of the area affects the capital
costs of  the  project.  High land  costs in the  urbanized parts of
the region favor the use of the pit  and injection well methods
which  require less land.  Spreading  basin methods  require  more
land and would more likely be used in rural areas. Economics will
strongly influence the degree to which artificial recharge operations
are initiated in the future.

c.  Potential Recharge  Areas   The Illinois State Water Survey has
identified ten  areas in  northeastern Illinois which would probably
be  suitable for the pit method of artificial  recharge. These  areas
vfeie selected because: there was  a well-defined cone of depression
in the water level surface of the aquifer under consideration; there
was a surficial sand and gravel deposit in the  area; and there was
a perennial stream in the immediate vicinity to serve as a source
of water with which to  recharge. The ten sites so identified  are
listed in Table 8-2, generally in order of decreasing need.

8.17  ENHANCEMENT OF NATURAL  RECHARGE  Manage-
ment measures can  also be  taken to  protect or enhance  natural
recharge.  For example, in rural areas, natural recharge rates  can
be increased thvough the use of basic  soil conservation techniques
such as contour plowing and terracing. In urban areas (as well as
in undeveloped  rural areas)  natural  recharge  can  be sustained
bv  restricting  the  construction of buildings, pavement and  other
impermeable surfaces in prime recharge areas.  If these areas  are
reserved as open space and protected from  intensive  urbanization,
they can continue to function in their recharge capacity.  On  the
other hand, if they are substantially developed, recharge will  not
be able to keep pace with withdrawal and  groundwater shortages
may develop. Figure 8-1 depicts the prime natural recharge areas
in the region.
TABLE  8-2: POTENTIAL ARTIFICIAL GROUNDWATER
            RECHARGE AREAS  IN NORTHEASTERN
            ILLINOIS(14)
County
Cook-Will . . .
Will 	
Lake 	
DuPage-Cook
DuPage
Cook
Kane 	
Kane
McHenry
DuPage

Potential
Recharge Area
.Park Forest-
Chicago Heights
.Joliet (Hadley
Valley)
. Libertyville-
Mundelein
. Western Springs-
Hinsdaie
Glen Ellyn-Lombard
Wheeling
. East Dundee-
Carpentersville
Elgin-South Elgin
Marengo
Lisie-Downers
Grove
Recharge
Source Aquifer
Thorn Creek Dolomite
Spring and Sand and
Hickory Creeks Gravel
Des Plaines River Sand and
Gravel
Dolomite
Salt Creek Sand and
Gravel
Dolomite
East Branch of Sand and
DuPage River Gravel
Dolomite
Des Plaines River Sand and
Gravel
Dolomite
Fox River Sand and
Gravel
Fox River Sand and
Gravel
Kishwaukee River Sano* and
Gravel
East Branch of Sand and
DuPage River Gravel
Dolomite
8.18  WASTEWATER RECYCLING AND  REUSE  Land  dis-
posal of wastewater has recently received a great deal of publicity
and  attention. In this approach, treated effluent is  spread  on the
ground surface,  usually with spray irrigation equipment. Nutrients
are removed through vegetative uptake, and the effluent is  further
treated by filtration through the soil. Originally,  it was intended
that the  water would continue to  percolate through the soil  and
eventually become a part of the  groundwater supply. However,
pending  more extensive  investigations, concern for  the protection
of public health prohibits the  use of such treated  wastewater as
a source of public  water supply. Indeed, spray irrigation projects
undertaken  to date have employed underdrain systems to prevent
pollution  of the aquifers.

  It also  is not likely that large scale, direct recycling of  waste-
water  effluent  for  use  as  public  water  supply  will become  a
(14): Ref. 8
                                                              F-2

-------
Figure 8-1   Prime Natural Recharge Areas in Northeastern Illinois
                                                                                                                       north
                                                                                                                      246   8  10
                                                                                                                      HBHHi
                                                                                                                       scale in  miles
        Based on information provided by the
        Illinois State Water Survey
                                                                                             THI PMPAUT10N OF THII MAP WU FMAIKtO M PUT TKWUCH AN UiMII
                                                                                             PLANNIM aKANT FROM THE HOUSINfl AND HOMI FINANCE ACENCT UNOCR
                                                                                             IHI nnyiiigm OF MOTION m OF rue HOUIIM tn or im u ANFJIHO

-------
realistic alternative in northeastern Illinois, at least in the immedi-
ate future. It is true that sophisticated methods of waste treatment
are presently  available which  allow near total reduction in the
biologic-ill and chemical  contaminants of wustcwators. When thus
purified, tho effluent is suitable for industrial  or agricultural pur-
poses. However,  the cost of such treatment,  when  coupled with
health concerns and probable aesthetic objections, does  not  pres-
ently favor the use of recycled wastewater for municipal supply.

   During 1973, this Commission reviewed two separate but related
applications for federal funds which involved testing  the feasibility
of recycling wastewater effluent for use as potable  water supply.
The applicants were the Village of  Bensenville and the Hinsdale
Sanitary District,  both  of  which are located  in eastern DuPage
County where there is  considerable concern for the adequacy of
local  groundwater supplies. The basic concept of both these pro-
posed research and development projects involves the incineration
of municipal solid waste to produce  heat, which can then be used
to distill treated  wastewater plant  effluent. Depending  upon the
outcome of test  results, the distillate could be used to directly
augment present water supplies or to increase local groundwater
recharge.   Both  projects are presently being  reviewed by the
USEPA. Their futures are uncertain at this time due to the paucity
of federal funds for projects of this nature.


SECTION E

Organization and Administration

8.19  FRAGMENTATION  Perhaps the most conspicuous  short-
coming of the present institutional  framework for  water supply
Is  the extensive  fragmentation of  authority  and  responsibility.
Several federal, multi-state,  state, regional, and county agencies
conduct specialized  programs  which have significance  in  water
supply planning and management. At the  local operational level,
there are  approximately 260 municipalities and numerous special
purpose districts  which are empowered to furnish water and en-
gage  in related activities. Then, too,  there are a number of private
utility companies authorized  to  provide  water, principally  in
subdivisions and other  unincorporated areas.

   At  the present time, this Commission is the only  governmental
unit  conducting  a comprehensive  water  resources   management
planning program in the six-county northeastern Illinois  region.
On the operational level, the trend continues  toward the creation
of more separate and independent systems which deal with prob-
lems on a piecemeal basis. Waterworks have been constructed and
expanded  without benefit  of areawide  planning, coordination or
controls. Slight attention has been paid toward developing a water
supply system for the  region as a  whole,  with the  view of pro-
viding for needs  beyond the immediate future. Instances of co-
ordinated, interlocal efforts have been few. Indeed, there are  cases
in which there has been keen competition between communities for
available water, a situation which has at times  interfered with the
optimum development of the resource.

   There are, of course, examples of successful  intergovernmental
cooperation. The  arrangement by which the City of Chicago pro-
vides  water to suburban Cook  County communities is  the  most
notable. Some  of the lakeshore communities north  of Chicago
provide water to  neighboring  inland municipalities  on  a similar
though more limited basis. There are also four public water  com-
missions  or districts which were  organized for the  purpose  of
obtaining  and furnishing water to customer  municipalities  on  a
sub-regional scale.

  The Great Lakes Basin Commission has noted that although  it
may be difficult, more emphasis should be put forth  in developing
plans  for  areawide utilities and cooperate efforts. (15)  Problems
such  as  well interference  could  be  solved by  preventing the
proliferation of small water systems  while favoring larger utilities
which cross  corporate  boundaries  and  which  develop the  best
available source of water rather than  relying heavily  on wells  in
the immediate area.  The GLBC recommends that the preparation
of such plans, before population pressures and increased water use
necessitate  Independent crash programs, should begin immediately
and be worked out with local, county  and regional planning com-
missions. Implementing plans  for areawide utilities  may  require
the creation of additional laws and regulations.

  The most  pressing future water  supply need  will be  that  of
providing adequate substitute sources for those areas of the region
where groundwater deficiencies are  expected to occur, Given the
fact that the areas of projected shortage are generally located some
distance  from Lake  Michigan, it  is  not feasible for  individual
municipalities to  construct their own  independent systems.  Some
type of multi-community approach may have to be taken in order
to achieve  economies of scale and  to minimize conflicts and in-
efficiencies.

8.20  ORGANIZATIONAL  ALTERNATIVES  There are several
alternative organizational structures which might be established for
this purpose, varying both in scope of authority and area of juris-
diction. A  number of these possible  alternatives  are highlighted
below to illustrate the  range  of management opportunities  avail-
ble.

a. Maintain Existing Arrangements   This is a continuance of the
status quo in which no  major changes  in agency structures or pre-
rogatives would be effected. Water supply  development and use
decisions would  continue to  be  made at  local levels, generally
without regard for broader area needs  and problems.

   Water supply has traditionally been viewed  as a local respon-
sibility, and  attempts to drastically alter  this approach may not
withstand the test of implementation. Therefore, expansion and
coordination  of the water supply programs of existing local  units
may be the most politically feasible  and  realistic method for deal-
ing with water supply problems on a regional scale. The potential
for duplication of effort, waste  of funds,  and competition and
conflict would remain.

b.  Metropolitan  Water Authority   At the opposite  end  of the
institutional spectrum would be the creation of a six-county metro-
politan water authority. If  authorized, this agency would assume
primary responsibility for furnishing water  on a "wholesale"  basis
throughout the region, or for significant portions thereof where
economies  of scale might  favor  such  an  arrangement.   Source
development,  treatment,  and primary  transmission  would fall
within its  purview.  Individual  municipalities  would  retain re-
sponsibility for constructing and operating local  distribution and
storage systems.                        '

   It  would  also   be  possible to expand  the role  of  the  water
authority to  include  other  important aspects of  water resources
management.  This  has been  done  in  the Detroit  metropolitan
area  where a single agency was created  to  deal with the water
supply, wastewater, and stormwater drainage problems  of Detroit
and 88 neighboring municipalities.   With respect  to water supply
alone, significant  cost savings have been realized as  a result  of
the metropolitan  utility approach.

   Such an agency would allow for the  systematic expansion and
operation of  all public  water  facilities in the region.  It would of
course be necessary to base such functional program on a  com-
prehensive  plan  for  the  region  to ensure orderly  and  efficient
growth and development.  Other issues  requiring careful consid-
(15): Ref. 9, pg. 278
                                                              F-4

-------
                             APPENDIX  G

               WATER QUALITY DATA OF WELLER'S  CREEK*
                   COMPARED TO  STATE STANDARDS**
    Waller's Creek
  Unit
           State Standards
Water

Temperature  (F°)

    Number of Analyses
    Maximum Value
    Minimum Value
    Average Value

Field Dissolved Oxygen (mg/1)

    Number of Analyses
    Maximum Value
    Minimum Value
    Average Value

Turbidity (JTU)

    Number of Analyses
    Maximum Value
    Minimum Value
    Average Value
Total Solids (Dissolved) (mg/1)

    Number of Analyses
    Maximum Value
    Minimum Value
    Average Value
   10
   75
   36
   55
    8
  8.5
  0.0
  2.9
   10
  800
   17
  102
   10
1,309
  234
  701
The maximum temperature rist
above natural temperature
shall not exceed 5°F.
January 60°F. Maximum
August  90°F. Maximum
Not less than 6.0 mg/1 during
at least 16 hours of any 24
hour period,nor less than
5.0 mg/1 at any time.
Waters shall be free from un-
natural sludge or bottom
deposits, floating debris,
visible oil, odor, unnatural
plant or alga growth, or un-
natural odor or turbidity.
1,000 mg/1
 *  Water Quality Network, 1971, Summary of Data, Volume 2.
    State of Illinois, Environmental Protection Agency.
**  Illinois Pollution Control Board, Rules and Regulations, Chapter 3,
    Water Pollution.  July 1973.
                                  G-l

-------
            WATER QUALITY DATA OF WELLER'S CREEK
                COMPARED TO STATE STANDARDS
    Weller's Creek                 Unit

Fecal Streptococcus (per 100 ml)

    Number of Analyses                3
    Maximum Value                37,000
    Minimum Value                   270
    Average Value                15,090

Coliform (per 100 ml)

    Number of Analyses                5
    Maximum Value               700,000
    Minimum Value                13,000
    Average Value               188,600

Chemical Oxygen Demand (mg/1)

    Number of Analyses               10
    Maximum Value                   120
    Minimum Value                    22
    Average Value                    49

Biochemical Oxygen Demand (mg/1)

    Number of Analyses                1
    Maximum Value                     5
    Minimum Value                     5
    Average Value                     5
       State Standards
No State standards
No State standards
 (Standards exist only
  for Fecal Coliform)
No State standards
No State standards
                                   G-2

-------
     WATER QUALITY DATA OF WELLER'S CREEK
         COMPARED TO STATE STANDARDS
Weller's Creek
                                 Unit
          State Standards
    Number of Analyses
    Maximum Value
    Minimum Value
    Average Value

Total Phosphate (mg/1 of

    Number of Analyses
    Maximum Value
    Minimum Value
    Average Value

Ammonia (mg/1 of N)

    Number of Analyses
    Maximum Value
    Minimum Value
    Average Value

Chloride (mg/1)

    Number of Analyses
    Maximum Value
    Minimum Value
    Average Value
                               10
                              8 . 3
                              7 . 3
                              7 . 7
                               10
                              4 . 2
                              0.3
                              1.7
                                5
                              3.8
                              0.6
                              2.1
                               10
                              395
                               70
                              181
Shall be within the range of
6.5 - 9.0.
Phosphorus as P shall not
exceed 0.05 mg/1.
Shall not exceed 1.5 mg/1
Shall not exceed 500 mg/1
                           G-3

-------
WATEP QUALITY DATA OF WELLER'S CREEK
    COMPARED TO STATE STANDARDS
Fluoride (mp,/l)

    Number of Analyses
    Maximum Value
    Minimum Value
    Average Value

Iron (Total) (mg/1)

    Number of Analyses
    Maximum Value
    Minimum Value
    Average Value

Phenols (mg/1)

    Number of Analyses
    Maximum Value
    Minimum Value
    Average Value

Sulfate (mg/1)

    Number of Analyses
    Maximum Value
    Minimum Value
    Average Value

Fecal Coliforms (per 100 ml)

    Number of Analyses
    Maximum Value
    Minimum Value
    Average Value
                           7
                         0.6
                         0.3
                         0.4
                           1
                         0 . 1
                         0.1
                         0.1
                           3
                          70
                           0
                          23
                          10
                         215
                          42
                          99
                          10
                      80,000
                         400
                      18,180
                                                State Standards
Shall not exceed 1.4 mg/1
Shall not exceed 1.0 mg/1
Shall not exceed 0.1 mg/1
Shall not exceed 500 mg/1
Based on a minimum of 5
samples taken over not more
than a 30 day period, shall
not exceed a geometric mean c
200/lOOml nor shall more  than
10% of the samples during any
30-day period, exceed 400/ml.
                       G-4

-------
                 Water Quality Data  1973 - Summary
         Higglns (Willow) Creek at the Des Plaines River

         (Units are in mg/1, unless otherwise indicated)
No.of  Analyses
Maximum Value
Minimum Value
Mean Value
Median Value
Criterion
 Water
Temp F

    11
    73
    32
    55
    56
63- 93
Field
 D.O.

   11
 13.1
  4.8
  9.0
  7.6
  5.0
 pH
Units

   11
  8.9
  7.5
  8.1
  8.2
6.5-9
Total
Phos

   11
 .900
 .180
 .496
 .450
 none
                                                            Avg
                                                           BOD-5
 COD
No.of Analyses
Maximum Value
Minimum Value
Mean Value
Median Value
Criterion
As

3
.000
.000
.000
.000
1.000
Ba '

3
.0
.0
.0
.0
5.0
Cd

3
.000
.000
.000
.000
.050
Cr
HEX
3
.00
.00
.00
.00
.05
Cr
TRI
3
.00
.00
.00
.00
1.00
Cr
TOTAL






No.of Analyses
Maximum Value
Minimum Value
Mean Value
Median Value
Criterion
                    TDS/EC    Fluor
                    Chlor
                     Sulft
11
670
230
559
600
1000
3
.4
.3
.3
.3
1.4
3
130
70
98
95
500
3
140
84
103
86
500
                   Total
                   Sulfr
                 Boron
                                                   3
                                                  .3
                                                  .2
                                                  .2
                                                  .3
                                                 1.0
No.of Analyses
Maximum Value
Minimum Value
Mean Value
Median Value
Criterion
Phenol

    11
  .005
  .000
  .001
  .000
  .100
   Cu

    3
 .000
 .000
 .000
 .000
 .250
                                          OIL
           MBAS

             11
           1.50
            .40
            .65
            .60
           None
           CCE
TURBY
#UNITS
                                  G-5

-------
                 Water Quality Data 1973 - Summary
         Higgins (Willow) Creek at the Des Plaines River

         (Units are in mg/1, unless otherwise indicated)
No. of Analyses
Maximum Value
Minimum Value
Mean Value
Median Value
Criterion
No. of Analyses
Maximum Value
Minimum Value
Mean Value
Median Value
Criterion
No. of Analyses
Maximum Value
Minimum Value
Mean Value
Median Value
Criterion
FEC COLI
No. /100ml.
11
20000
100
659
510
200
Cu
3
.11
.05
.08
.10
.02
Fe
TOTAL
3
.6
.2
.3
.3
1.0
AMM
N
11
.90
.05
.28
.21
1.50
Pb
3
.10
.02
.05
,05
.10
Fe
DISS






NTRAT+
NTRIT
11
1.5
.0
.8
1.0
None
Kn
3
.15
.05
.11
.13
1.00
Hg
/ig/1
3
.2
.0
.0
.0
.5
                                                ORG
                                                 N
        TOTAL
          N
TSS
 Ni

   3
  .0
  .0
  .0
  .0
 1.0
                                                  Se
   3
 .00
 .00
 .00
 .00
1.00
                                                           Ag
 Zn
3
.000
.000
.000
.000
.005
PLNKTN
NO/
3
.1
.0
.0
.0
1.0
COLOR
UNITS
                                  G-6

-------
                 Water Quality Data 1974 - Summary
                 (Willow) Creek at the Des Plaines River
          (Units are in mg/1 , unless otherwise  indicated)
No. of Analyses
Maximum Value
Minimum Value
Mean Value
Median Value
Criterion
 Water
Temp F

     7
    72
    33
    48
    42
 63-93
                              Field
                               DO
19
 9.7
12.7
12.2
 5.0
 pH
Units

    7
  8.6
  8.0
  8.3
  8.3
6.5-9
Total
Phos

    7
 .600
 .200
 .350
 .300
 None
                             Avg
                            BOD-5
                            COD
No. of Analyses
Maximum Value
Minimum Value
Mean Value
Median Value
Criterion
As

2
.0
.0
.0
.0
1.0
Ba

2
.0
.0
.0
.0
5.0
Cd

2
.00
.00
.00
.00
.05
Cr
Hex
2
.00
.00
.00
.00
.05
Cr
Tri
2
.0
.0
.0
.0
1.0
Cr
Total






                    TDS/EC    Fluor
                    Chlor
                  Sulft
                   Total
                   Sulfr
                  Boron
No. of Analyses
Maximum Value
Minimum Value
Mean Value
Median Value
Criterion
6
810
410
603
615
1000
2
.5
.3
.4
.4
1.4
2
100
65
82
82
500
2
120
93
106
106
500
                                                    2
                                                   .3
                                                   .2
                                                   .2
                                                   .2
                                                  1.0
                    Phenol
             Cn
           Oil
          MBAS
           CCE
Turby
#Units
No. of Analyses
Maximum Value
Minimum Value
Mean Value
Median Value
Criterion
7
.006
.000
.001
.000
.100
1
.00
.00
.00
.00
.25
                                 7
                               .60
                               .40
                               .47
                               .40
                              None
                                  G-7

-------
                            Water  Quality  Data  1974  -  Summary
                    Higgins  (Willow)  Creek at the  Des  Plaines River

                    (Units are  in  mg/1,  unless  otherwise indicated)
           Noi of Analyses
           Maximum Value
           Minimum Value
           Mean Value
           Median Value
           Criterion
           No. of Analyses
           Maximum Value
           Minimum Value
           Mean Value
           Median Value
           Criterion
           No. of Analyses
           Maximum Value
           Minimum Value
           Mean Value
           Median Value
           Criterion
FEC COL.
No./lQO ml.
!8 7
3500
100
881
1100
200
Cu
:S 2
.10
.00
.05
.05
.02
Fe
TOTAL
s 2
1.3
0.6
0.9
0.9
1.0
AMM
N
7
0.75
0.08
0.28
0.25
1.50
Pb
2
.09
.05
.07
.07
.10
Fe
DISS






NTRAT+
NTRIT
7
1.8
0.1
1.0
1.1
None
Mri
2
.09
' .09
.09
.09
1.00
Hg
pgA
2
.3
.0
.1
.1
.5
                                                            ORG
                                                             N
       TOTAL
         N
        TSS
 Mi

  2
 .0
 .0
 .0
 .0
1.0
                                                              Se
  2
 .0
 .0
 .0
 .0
1.0
 Ag

   2
.000
.000
.000
.000
.005
 Zn

  2
 .0
 .0
 .0
 .0
1.0
       PENKTN  COLOR
        NO/ML  UNITS
                                               G-8