United States
                  Environmental Protection
                  Agency       	
Environmental Monitoring
Systems Laboratory
Research Triangle Park, NC 27711
                  Research and Development
EPA/600/S4-88/015 July 1988
SEPA         Project  Summary
                   Identification  of  Subpart  Da
                   Sources  and EPA  Regional/
                   State Agency  Contacts  for  the
                   Implementation  of  Appendix  F,
                   Procedure  1
                   James W. Peeler
                    The full report identifies the status
                  of electric utility steam generating
                  units and associated  contact  infor-
                  mation in keeping with Appendix  F,
                  Procedure 1,  "Quality  Assurance
                  Requirements" for Gaseous Continu-
                  ous Emission  Monitoring  Systems
                  Used for Compliance," of 40 CFR 60.
                     This   Project Summary was
                  developed by  EPA's Environmental
                  Monitoring Systems  Laboratory,
                  Research  Triangle Park,  NC, to an-
                  nounce key findings of the research
                  project that is fully documented in a
                  separate report of the same title (see
                  Project Report ordering information at
                  back).


                  Introduction
                    Appendix F, Procedure 1 of 40 CFR
                  60 requires that sources subject to
                  Standards of Performance for New
                  Stationary Sources, Subpart Da conduct
                  certain  quality assurance activities and
                  submit  a Data Assessment Report  (DAR)
                  on a quarterly basis  to the applicable
                  control agency. The subject project
                  report presents a list of all electric utility
                  steam generating units that are believed
                  to be  subject to Subpart  Da. The list
                  indicates whether each unit is currently
                  operating,  under construction,  or
                  planned, provides source contact infor-
                  mation, and identifies the state agency
                  contacts   who  are  believed  to  be
                  responsible for review of the DARs A list
of EPA Regional Office contacts is also
provided.

Results
   Information developed from the Sub-
part Da source list is  concisely  sum-
marized in Figure 1,  "Distribution of Da
Sources." The list of specific Da sources
is presented as Table 1  of the full report
and is arranged by EPA region and state.
The list identifies the company, station,
and generating  unit and indicates the
status of each unit.
   Based upon the information available
at the  time this report was prepared,
there  are 36 operating electric  utility
steam  generating units  located  at 30
generating stations owned by 29 different
companies subject to Subpart Da  These
facilities are located  in 17  states rep-
resenting 7 EPA Regional Offices.  The
results show that 18 additional units are
currently  under  construction. If  all of
these units are completed, there will be
54 generating  units  at  40 generating
stations owned by 36  companies subject
to Subpart Da. The  information on
planned units is  less reliable. Some of
the planned units are not scheduled to
begin operation until  the year 2000 or
later.
   A list  of state contacts who  are
believed  to be  responsible for  DAR
review  is presented in Table 2 (in the full
report) for those states where  a Da
source is operational, under construction,
or planned. Table 2 also indicates which

-------
states have  delegation of authority  for
Subpart Da.
   A list of the principal contact in each
EPA Regional  Office for  information
regarding the implementation  of Ap-
pendix F, Procedure  1 at  Subpart  Da
sources is provided in Table 3 in the full
report.
                                                    Legend
                                             Operating  Under  Planned
                                                    Construction ———
                                                  0       JO      20      30      40


                                         Figure 1.    Distribution of Da Sources (3/8/88).
                                            James W. Peeler is  with Entropy Environmentalists, Inc., Research  Triangle
                                                  Park, NC 27709.
                                            Darryl J. von Lehmden is the EPA Project Officer (see below).
                                            The complete report, entitled "Identification of Subpart Da Sources and EPA
                                                  RegionallState Agency Contacts for the Implementation of Appendix F,
                                                  Procedure 1," (Outer No.  PB 88-202 5101 AS; Cost: $12.95,  subject to
                                                  change) will be avWable only from:
                                                     National Technical Information Service
                                                     5285 Port Royal Road
                                                     Springfield, VA 22161
                                                     Telephone:  703-487-4650
                                            The EPA Project Officer can be contacted at:
                                                     Environmental Monitoring Systems Laboratory
                                                     U.S. Environmental Protection Agency
                                                     Research Triangle Park, NC 27711
  United States
  Environmental Protection
  Agency
Center for Environmental Research
Information
Cincinnati OH 45268
   Official Business
   Penalty for Private Use $300

   EPA/600/S4-88/nic
             0000329   PS

             CHlGftSO

-------