     Secretary Hieke1 announced the establishment of several enforcement
workshops to discuss the vater pollution abatement programs  on a  subbasin
basis.  The following indicates the area of discussion for each workshop
location:

Location                 Subbasin                  Rivers

Toledo, Ohio             Maumee River Basin        Maumee  and Tributaries

Sandusky, Ohio           North Central Ohio        Portage,  Sandusky,  Huron,
                                                   Vermilion,  Black

Cleveland, Ohio          Greater Cleveland-Akron   Rocky,  Cuyahoga,  Chagrin

Ashtabula, Ohio          Northeast Ohio            Grand,  Ashtabula,  Conneaut

Erie, Pennsylvania       Pennsylvania              Entire  Lake Erie-
                                                   Pennsylvania ares

Lackawanna               New York                  Entire  Lake Erie-New
(Buffalo), N.Y.                                    York Area

     The Maumee River Basin area is largely agricultural,  however,  there
is a large agricultural, municipal, and industrial loading to the waters.
The communities in this area range from small rural communities to two
of the largest in the Lake Erie Basin.   The predominant industrial
activity is production of petroleum products.  However, there are rather
diverse industrial activities in the area with other major activities
including canning and other food processing, metal finishing,  and manu-
facturing.

ABATEMENT SCHEDULES

     At the March 22, 1967 reconvening of the Lake Erie Enforcement Con-
ference, the conferees for each state submitted time schedules for abatement
of pollution from municipal and industrial waste discharges  within the
Lake Erie basin.  The following table summarizes the established  schedules
for the Maumee River Basin area:

                          No                Scheduled Completion
Total
48
48
Adequate
Facilities
8
19
Established
Schedule 1967 1968
5
1
Municipalities
5 12
Industries
7 15
in
1969 1970
16 1,
6
1971 1972
1

-------
     The status of compliance with the time  schedules  is  as  follows:
Schedule
5
1
Completed
11
19
Presently
Meeting
Schedule
Municipalities
Industries
-
Wot Meeting Schedule
Intermediate Final
Phase Phase
2 22
9
PHOSPHORUS REMOVAL SCHEDULES

     Included in the recommendations of the Lake Erie Enforcement Con-
ference is the removal of phosphorus from sewage treatment  plants by 1971.
At the June 27, 19^9 progress evaluation meeting, compliance schedules were
submitted.  The municipalities in the Maumee area required  to remove phos-
phorus and the compliance date established by the State for each plant is
as follows:

     INDIANA

               All municipalities with populations greater  than 2,000
               will "be required by Indiana to have phosphorus removal
               facilities by December, 1972.

     OHIO
                             Direct Discharges to Lake

                                                    Completion Date

               Toledo                                    1971

                           Discharges to Tributary Streams

               Defiance                                  1971
               Findlay                                   1975
               Lima                                      1975

STATUS

     The following table summarizes the status of municipalities and
industries listed in the March 22, 1967 abatement program and pertains
to Conference requirements only:

-------
M A U M E E    R  I V R R    BASIN    A  R E A
                      B-L

-------
                                   MAUMEE  RIVER BASIN AREA
                             Status	   Original
                         Actual  Scheduled   Schedule
                               Remarks
                                       Months Behind
                                           Original
                                           Schedule
INDIANA

  St. Marys River

  Berne

  Decatur
F

CO
CO

CO
CO 12-68

CO 12-68
16
  St. Joseph River

  Auburn

  Avilla


  Butler


  Garrett

  Waterloo
F
F
CO
CO
CO
CO
CO
CO
CO 12-68
CO 12-68
CO 12-68
CO 12-68
                             State has issued prior-    16
                             ity for Federal grant

                             State has issued pri-or-    l6
                             ity for Federal grant
  Maumee River

  Diversified
  Utilities
  Fort Wayne

  Monroevilie

  New Haven
UC
         CO
CO
        CO 12-68
CO 12-68
            Stream Bd.  order issued
            3-1T-TO for expansion
            of facilities & connection
            to Fort Wayne
16
16
                             In litigation relative
                             to sale of bonds for plant
                             expansion & construction
                             of chlorination facilities
                             presently overloaded.
       PP = Preliminary plans
       FP = Final plans
       F  = Financing
       UC = Under construction
       CO <= Complete construction
                                             B-2

-------
                                MAuMi'T RIVE?.  BACIN AREA (f>nt 'd ;
                              Status
Actual
                                    heduled
 Original
 Schedule
Remark r;
MonthG Behind
   Ori pi nal
   Schedule
GUI'".

  :Jt. Marys Ri ver

  P,o;'kf ord
  FP
                            f'O
PP 9-lr>-67  Extended scredule to
FP ^-15-6;'  k-71 for fr S. F
CO P-1S-6Q

FP 6-lr,-nT
CO 6-IS-69
      Jor-ep::  iMver
           CO      FP 2-lr>-6''   K-ri ended s
                   CO 12-lr'-<'''9 - -'70 HO s-f
                                                                             !o
                                                                        !JC
  Aup.lg r ".P '•' I vp-r

  C ^Li I*M i ip. Grovr

  Cri ders11 1 lie
           CO       CO  l?-lr,-6"
                            PP       UC      PP  3-lr->-6r   Extended G"hedi.le  to
                                             FF  3-l'j-69   6-70 for PP and
                                             CO  9-1S-70   authorization ^f ''p

                            CO       CO      In  operation  Nr ."blor ' na t j or
  Fore r.t
  Ohio Citv
  UC       CO      FP  7-15-67  Extended schedule HO
                   CO  6-15-69  6-70 to CO

  CO       CO      In  opera-
                   tion  7-67

  CO       CO      FP  ''-1-67   CO 1-70
                   CO  12-5-6°

  TIC       -       PP  7-1^-67  Permit to 2-71 for CO
       PP ~ Preliminary plena
       FP - Final ulans
       F  - Financing
       UC = Under construction
       CO = Complete  construction

-------
                               MAUMEE  RIVER  BASIN AREA (Cont'd)
                             Statue	   Cr I pina!
                         Act iial  Scheduled   Schedule
                                                    Remarks
                                        Months  Behind
                                            Ori gi na1
                                            R<-hedule
01:10 (Oor-n'd)

  Auplai/e Pi ver (Cont'd)

  Psndn-g                  UC


                           CO
                           FF
CO      CO 1-15-69  Under orderF  -  permit
                    to 3-71 for CO

CO      U.O. early
        67.  In
        operation
        early 6<°

00      PP "-15-67  Extended schedule
        FF >--l.S-6<   to 11-70 for  FP, F,
        00 12-1^-6-Q and si.srt HO
                                                                              16
    ry
-------
                              MAUl^K Hivp.li  BASF! ARFA (Cont'd)

Aft'
"" ( r> "f ' "-'
JBl ^ f] r dulr
Ori 'inal
•d Tr^edule Remarks
!:^nt;-s Bf-'bind
Ori ri n&l
rr-?-e'li,1 e
         'd)

         . >. fir  (Conl'd)
                                   CO      FP  3-15-67   Pera;t denied In 1'56'i
                                           CO  5-30-6'    No pro.^rer-s s 1 nr-o c'6 -
                                                              nef1 enr! nepr.c •* o
                                                           ' id r.ev -,-'la, 1
                                   CO
"lorttivoocl
To!edo
     LeLpsic


CO
                                   co
UC
                                   co
        CO

        PP
                  PP 6-15 -67
                  FP 6-30-6B
                  co i? -3 1-69

                  PP '-1-3-67
                  FP S-15-6^'
                  co 9-1^-69

                  UC ?-6"
                  PP 7-1 5-6^
                  FP ' -15-6'-
                  CO 2-72

                  PP 7-15-67
                  FP T-i5-6r'
                  co 12-15-69
                  No  schedule
                                           Bids 12-66
                               2/71 for F? -"  1 -vert • -
                               gate F

                               FP & F for ppwc-rs  dur
                               9-70 (to !e tr i >'in ary
                               to Vfnod C"'Am1y  plant  -
                               part tri'i . to
                      Ext.ended sch
                      to 12-15-"0 to r-tart UC
                                                        Eenewnl  nrt  yet rer-eived
                                                        FP not  s^rrritted
Extended  schedule  to
6-70 to start UC
                      Extended to 1P-70 for
                      subir~'ssion '-f aprr-etneni.
                      to Lu^as Co  Plsnt
                      (Jerome Road)

                      Perrr-lt being held -
                      financial nroMerr.
l,\icas County

  Metropolitan GL
    Holland Snbd:st
FP
Y
     PF = Preliminary plans
     FP = Final plans
     F  = Financ.'ng
     UC = Under construction
     CO - Complete construction
CO      PP 3-15-67    Permit  being processed-   35
        FP 6-1-67     Revised plans needed for
        CO 1-15-69    now area (ratervilie).
                      F  nearly completed.
                     B-5

-------
                                MAUMEE RIVER BASIN AREA  (ContM


                                                                            Months Behind
                              Statue          Original                         Original
                          Actual  Scheduled   Schedule     Remarks             Schedule

OHIO (Cont'd)

  Ottawa R:\er

  Sylvan"a                 CO       CO      CO 6-6?

  LuoEts Ccunty

    Melropolitan 3D        -        -           -
      '-ylvan Woods Subdiv.
  Small Tributaries to Lake Erie

  Wslhridfje                CO       CO      CO 6-1S-6?

  Lunar, County

    I'.etropolitsn 3D        -        -
      Fuller's Creekside
      Subd i v.

  V.'ood. County

    Main Sewer Dist. ,r9    -
      Sanitary SD -/fl
      Indian Trails Estates


  Direct to Lake Erie

  Harbor View              Connect to Oregon    No schedule-
                           when evailable

  Oregon                   F        CO      FP 7-30-6P   Permit heir,r held -
                                            CO 12-30-69  not. yet UC
•>
       PP = Preliminary plans
       FP = Final plans
       F  = Financing
       UC = Under construction
       CO = Cotrrnlete construction
                                              B-6

-------
M A U M E E
RIVER
BASIN
AREA
                      B-l

-------
                                  MAUMEE RIVER BASIN AREA
                            Status	   Original
                        Actual  Scheduled   Schedule
                               Remarks
                                        Months Behind
                                           Original
                                           Schedule
INDIANA

  St. Marys River

  Central Soya Co.Inc.
    Decatur
  St. Joseph River

  Auburn Tankage Co.
    Auburn
               Plant closed
  County Line Cheese Co.
    Auburn
  Crane,  Erimund Corp.
    Butler

  Kitchen Quip, Inc.
    Waterloo
         CO    CO 12-68     Unfavorable court de-
                            cision thwarted state
                            enforcement action
                                               16
  Sechier & Sons,  Inc.
    St. Joe
  T.  H.  Products Corp.
    Waterloo

  Universal Tool &
  Stamping Co.
    Butler

  Warner-Motive Div.
  Borg-Warner Corp.
    Auburn
CO
CO
CO
CO
CO 12-68
pp 3-2-67
CO 12-68
       PP = Preliminary plans
       FP = Final plans
       F  = Financing
       UC = Under construction
       CO = Complete  construction
                                             B-2

-------
                               MAUMEE RIVER BASIN AREA (Cont'd)
                            Status	   Original
                        Actual  Scheduled   Schedule
                              Remarks
                                        Months Behind
                                           Original
                                           Schedule
INDIANA (Cont'd)

  Kauir.ee River

  Dana Corp.,  Salisbury
  Div.
    Fort Wayne

  Essex Wire Corp.
    Fort Wayne

  Franlce Plating
  Works, Inc.
    Fort Wayne

  General Plating &
  F,ng., Inc.
    Fort Wayne
  Gladjeux Cil
  Refining Inc.
    Fort Wayne

  Goodrich,  B.F.,  Co.
    Woodburn

  International  Har-
  vester Co.
    Fort Wayne

  IT&T Federal
  Laboratories
    Fort Wayre

  Magnavox Co.
    Fort Wayne
UC
FP
CO    CO 12-68
CO
               CO 12-68
         CO
      CO 12-68
Completion expected
by 6/70
State held enforcement
hearing 2-U-70, recommend-
ed order be.'np prepared
by Bd. to order prepara-
tion of plans and con-
struction of adequate
facilities.
16
Sanitary wastes
       PP = Preliminary plans
       FP = Final plans
       F  = Financing
       UC = Under construction
       CC = Complete construction
                                           B-3

-------
                                    '}•;]• FIVER  RAFIM MKA (Ocnt'rl)
                                               Orn' 
-------
                          :;t,atur
Or 1 f,i na 1
T nV e du le   Hera rk "
                                          Months Be>':rd
                                             Or: p; i rial
                                                   le
                                          FP > -l-t>7    Extended  schedule to
                                          CO ,-1-6',.    9-^0 to connect  1 o
                                                       Pardors nyrler^
                                          ?P 1-1-6'"
                                          CO 1-1-69
                                    CO     CO 2-1-67
                          CO
      In-plant
      controls
      1-1-6?,
>'nlher  \  .'on,-.,  Inc.
  V'npnkoneta
      No schedule
C a nip oe 11 S oup C o .
  Tlanoleon

CeriLral lr'oiindry Oiv.
GKC, neriarice Plant
Fdrerton Metal  Prod.
Inr.
       t on
CO    FP l-6>:
      co 7-1-69

CO    CO "-1-67
                                   CO    FP 7-1-67
                                         CO 7-1-6--
     TP - Preliminary plans
     FP - Final plans
     F  •- Finsncing
     UC - Under construction
     TO - Cor.le^e conrtruntion

-------
                                MAUMi'.F RIYEK BAoIN AREA (Cont'd)
                            Htatus
Actual  fcbeduled
                                              Original
                                              Schedule
                                                         Remarks
                                         Months Behind
                                            Original
                                            Schedule
OHIO  (Corr1 fd)
  ilaum^e Pi vcr ( C out ' d )

  T.'] --H n PiaMnp P' v,
  Dy naves'  Corp,
    Napoleon
InterJfike Steel  Corp.
  Toledo

Johrs-1-larw • LI e F-'-er
Glass, Inc. ,  riant  ;'3
  ]>-f i an re

Johns-Manvnie FJber
Glasa, Inc.,
  W 3 1 e r v 1 1] e  F la n t

Lohljy-HcNeill &  Libl-y
  Lej psic

C. f. A'ayrie Tool Co.
  Defiance
          ead Co.
  n'nio Division
    Antwerp

                           CO
                           CO
                           UC
CO    FP 7---.'~    Fchednle  extended  to
      CO 7-:-f'';'    ''-TO to connect  to
                   Fanoleon  or  nibrr.1t FP
                   qnd start UC

CO    FP "3-1-6.-
      CO • -1-69

CO    CO I -1-67
CO    CO 12-1-66   Does not meet  Conference
                   requirements.   Additional
                   treatment necessary.

CO    FP 6-1-6?
      CO 6-1-67
      FP 3-1-67
      CO 1-1-6H
                                         FP 6-1-67
                                         co 9-1-6;-'
                              Extended  schedule  to i-70   2
                              for  connection  to  Defiance
                              system.

                              Operations not  adequate
  Ottawa River (Ten Kile Ok)

  "Dana Corp,                CO
    Toledo Di".
                                   CO     CO 12-1-66   Investipatinp need
                                                      for oil removal facilities
  Small Tril'Uiari_gR to Lake Erie

  Doerler-Jar'-ic Bi-. .       CO
  national Lead Co.
    Toledo Plant ;-2
                                   CO    FP 6-1-67
                                        CO 6-l-6o
       pp = Prelim i nary plant
       FP = Final plans
       F  = Financi!it~
       UC = Under corstruction
       CO = Complete construction
                                            B-G

-------
                                MAUMEE RIVER BASIN AREA (Cont'ri)


                                                                             M' nths Behind
                              otg-fus           Origins!                          Ordinal
                         Actual  Scheduled    Schedule     "Remarks              Schedule


CKIC  (Cont'd)

  frrall Tributaries to lake Erie  (Cont'd)

  THrzel rannirjc Or.       CO       CO   CO ^-1-67
    ;;art Tolrdo

                           ?P       CO   FP Ln-i-c'7   :-;xtended rr-her]nle to        ^J
                                          CO 1-1-69    " ''' -70 for FP srri TTC


                                     CO   EP 1-1-6;
                                          CC ;>--'l-!'9

  r^loio J^ale, Div. of    CO       CO   FP 7-1-67
  Toledo Scale C wp.                      "^
    Toledo
  f::f'V Re!, i a art- Electric)
       PP - Preliminary plans
       FP - Final plans
       F   = Financing
       UC = Under construction
       CO = Complete construction
                                            TV"

-------