Understanding Procurement for Sampling and
 Analytical Services Under a Triad Approach
               U.S. Environmental Protection Agency
             Office of Solid Waste and Emergency Response
       Brownfields and Land Revitalization Technology Support Center
                    Washington, DC 20460

-------
                                NOTICE AND DISCLAIMER

This document was prepared by the U.S. Environmental Protection Agency's (EPA) Office of Solid
Waste and Emergency Response, with support provided under EPA Contract 68-W-02-034.  The
information in this document is provided to help in developing and implementing Triad-specific
procurement approaches but is not intended to revise or update EPA policy or guidance.  Mention of trade
names or commercial products does not constitute endorsement or recommendation for use.

Case study information provided in this document was verified by site contacts as of early 2004.

This document can be obtained from EPA's Brownfields and Land Revitalization Technology Support
Center at http://www. brownfieldstsc. org. A limited number of hard copies of this document are available
free of charge by mail from EPA's National Service Center for Environmental Publications at the
following address (please allow 4 to 6 weeks for delivery):

       EPA/National Service Center for Environmental Publications
       P.O. Box 42419
       Cincinnati, OH  45242
       Phone:  (513) 489-8190 or (800) 490-9198
       Fax: (513)489-8695

For further information about this document, please contact Dan Powell of EPA's Office of Superfund
Remediation and Technology Innovation at (703) 603-7196 or by e-mail at powell.dan@epa.gov.
U.S. Environmental Protection Agency
Office of Solid Waste and Emergency Response
Brownfields and Land Revitalization Technology Support Center

-------
                           ACRONYMS AND ABBREVIATIONS

AA           Atomic absorption
bgs           Below ground surface
BOA         Basic ordering agreement
BTSC         Brownfields and Land Revitalization Technology Support Center
CICA         Competition in Contracting Act
COC         Chemical of concern
Cr            Chromium
CSM         Conceptual site model
DCAA        Defense Contract Audit Agency
DDT         Dichlorodiphenyldichloroethane
DNAPL       Dense nonaqueous-phase liquid
DoD          U.S. Department of Defense
DOE         U.S. Department of Energy
EPA          U.S. Environmental Protection Agency
ERRS         Emergency and Rapid Response Services contract
ERT          Environmental Response Team
ESAT         Environmental Services Assistance Team contract
FAR          Federal Acquisition Regulations
FDEP         Florida Department of Environmental Protection
FedBizOpps   Federal Business  Opportunities web procurement portal
FIELDS       Field EnvironmentaL Decision Support
FSP           Field sampling plan
GC/MS       Gas chromatography/mass spectrometry
GIS           Geographic information  system
GPS          Geopositional satellite
GSA          General Services Administration
HazCat       Hazard categorization
IA            Immunoassay
ICP           Inductively coupled plasma
ID/IQ         Indefinite delivery/indefinite quantity
IGCE         Independent government cost estimate
LIF           Laser-induced fluorescence
mg/kg         Milligram per kilogram
MIP          Membrane interface probe
MIPR         Military interdepartmental purchase request
MSA         Master services agreement
MTCA        Model Toxics Control Act
NJDEP       New Jersey Department of Environmental Protection
O&M         Operation and maintenance
Ohio EPA     Ohio Environmental Protection Agency
ORD         Office of Research and Development
OSC          On-Scene Coordinator
OSRTI        Office of Superfund Remediation and Technology Innovation
PAH          Polycyclic aromatic hydrocarbon
PBC          Performance-based contracting
PCB          Polychlorinated biphenyl
PCP          Pentachlorophenol
POL          Petroleum, oil, and lubricants
ppm          Part per million
U.S. Environmental Protection Agency
Office of Solid Waste and Emergency Response
Brownfields and Land Revitalization Technology Support Center    ii

-------
                      ACRONYMS AND ABBREVIATIONS (continued)

PRP          Potentially responsible party
QA           Quality assurance
QAPP        Quality assurance project plan
QC           Quality control
RA           Remedial action
RAMP        Remedial action management plan
RCRA        Resource Conservation and Recovery Act
RD           Remedial design
redox         Reduction-oxidation
RFP          Request for proposal
RI            Remedial investigation
SADA        Spatial Analysis Decision Assistance
SCAPS        Site characterization and analysis penetrometer system
SIFU         Site Investigation Field Unit
SOQ          Statement of qualifications
SOW         Statement of work
SVOC        Semivolatile organic compound
TCA          Trichloroethane
TCE          Trichloroethene
TPH          Total petroleum hydrocarbons
USAGE       U.S. Army Corps of Engineers
VCP          Voluntary cleanup program
VOC         Volatile organic compound
XRF          X-ray fluorescence
U.S. Environmental Protection Agency
Office of Solid Waste and Emergency Response
Brownfields and Land Revitalization Technology Support Center

-------
        Understanding Procurement for Sampling and Analytical Services Under a Triad Approach


                                      CONTENTS

Section                                                                             Page

1.0     INTRODUCTION	1
2.0     APPROACHES AND STRATEGIES FOR PROCURING SAMPLING AND ANALYTICAL
       SERVICES UNDER A TRIAD APPROACH	7

       2.1    TRIAD-SPECIFIC CONSIDERATIONS	7
       2.2    OVERVIEW OF PROCUREMENT APPROACHES FOR TRIAD SERVICES	11
       2.3    PROCURING TRIAD SERVICES USING A NEW CONTRACT	16
             2.3.1   Identifying a Contract Type and Solicitation Method	17
             2.3.2   Preparing a Request for Proposal Under the Triad	18
             2.3.3   Evaluating Proposals for Triad Services	22
             2.3.4   Awarding a New Contract	28
       2.4    PROCURING TRIAD SERVICES USING AN EXISTING CONTRACT	29
             2.4.1   Preparing a Statement ofWork	29
             2.4.2   Evaluating the Work Plan and Cost Estimate	30
             2.4.3   Approving the Work Under an Existing Contract	31
3.0     EXAMPLES OF RECENT PROCUREMENT EXPERIENCES	32
       3.1    FEDERAL CASE STUDIES	34
             3.1.1   Sonic Drilling Services for the McCormick and Baxter Superfund Site
                    DNAPL Investigation	35
                    3.1.1.a    Background	35
                    3.1.1 .b    Procurement Information - McCormick and Baxter
                              Superfund Site	35
             3.1.2   Immunoassay Testing for Pesticides at the Wenatchee Tree Fruit Research
                    and Extension Center Site	37
                    3.1.2.a    Background	37
                    3.1.2.b    Procurement Information - Wenatchee Tree Fruit Research
                              and Extension Center Site	38
       3.2    STATE CASE STUDIES	39
             3.2.1   Use of Short-Listed Contractors in State of Florida Dry Cleaner Remediation
                    Program	39
                    3.2.1.a    Background	39
                    3.2.1 .b    Procurement Information - State of Florida Dry Cleaner
                              Remediation Program	40
                    3.2.1 .c    Specific Example Site - State of Florida Dry Cleaner
                              Remediation Program	41
                    3.2.1.d    Specific Example Site - State of Florida Remediation	42
             3.2.2   Use of In-House Field Capabilities for Ohio EPA Site Assessments	43
                    3.2.2.a    Background	43
                    3.2.2.b    Procurement Information - Ohio EPA	44
       3.3    LOCAL GOVERNMENT CASE STUDY	45
U.S. Environmental Protection Agency
Office of Solid Waste and Emergency Response
Brownfields and Land Revitalization Technology Support Center    iv

-------
         Understanding Procurement for Sampling and Analytical Services Under a Triad Approach


                                   CONTENTS (continued)

Section                                                                                 Page

              3.3.1   Direct-Push Sampling at the Assunpink Creek Greenway Project, Trenton,
                     New Jersey	45
                     3.3.1.a     Background	45
                     3.3.1.b     Procurement Information - Assunpink Creek Greenway Project	46
       3.4    PRIVATE SECTOR CASE STUDY	48

              3.4.1   On-Site Lead Analysis at Lake Success Business Park (DuPont),
                     Connecticut	48
                     3.4. La     Background	48
                     3.4.1.b     Procurement Information - Lake Success Business Park	49
4.0    CONCLUSIONS	51
                                          TABLES

Table                                                                                   Page

1-1    Additional Information Related to Procurement in Attachments	5
2-1    Examples of Questions to Include in an RFP for Triad Services	21
2-2    Examples of Elements of a Project Plan for Using a Triad Approach	24
2-3    Insurance Coverage Considerations for Contractors	28
3-1    Summary of Recent Procurement Experiences - Selected Sites and Programs	32

Additional Information Related to Procurement in Attachments	53


                                         FIGURES

Figure                                                                                  Page

2-1    Triad Services - Procurement Under Existing and New Contracts	15
U.S. Environmental Protection Agency
Office of Solid Waste and Emergency Response
Brownfields and Land Revitalization Technology Support Center     v

-------
          Understanding Procurement for Sampling and Analytical Services Under a Triad Approach

                                    1.0     INTRODUCTION

The use of innovative technologies and approaches to streamline site investigations and cleanup of
hazardous waste sites is continuing to expand, providing opportunities for better, more cost-effective
solutions to environmental problems compared to traditional approaches.  One such approach is the Triad
- an innovative approach that uses systematic project planning, dynamic work strategies, and real-time
measurement technologies to reduce uncertainty and improve decision-making while reducing overall
project costs and timeframes. The overarching goal of the Triad approach (see box) is to actively manage
decision uncertainty.  The confidence and effectiveness of project decision-making are improved by:
    •   Identifying and managing decision uncertainties (those unknowns that stand in the way of making
        confident decisions) and data uncertainties (sources of variation in data when decisions are based
        on data)
    •   Incorporating advanced science and technologies to support "better, faster, and cheaper" projects
  The Triad Approach - Overview
  The Triad is an approach to environmental decision-making that is grounded in the management
  of decision uncertainty. This approach is used to manage decisions based on environmental
  data and addresses sampling, analytical, and relational uncertainties associated with those data.
  The most cost-effective way to accomplish uncertainty management is by using modern
  technologies and strategies to rapidly and efficiently build a conceptual site model tailored to
  support site-specific risk and remedial decision-making needs. These concepts are captured in the three elements
  of the Triad, which are systematic project planning, dynamic work strategies, and real-time measurement
  technologies.  Refer to WTOU|iadcCTt|iLorg for additional information.
Triad practitioners are developing a growing collection of information about the technical implementation
of the Triad.  However, only limited information is available regarding the procurement of sampling and
analytical services under a Triad framework.  Specifically, the dynamic nature of this approach requires
that Triad-specific procurement issues be addressed, namely providing the flexibility and adaptability
during project implementation that are crucial to the success of the Triad and to allow for the thorough,
up-front planning required by the approach.  The U.S. Environmental Protection Agency (EPA), through
its Brownfields and Land Revitalization Technology Support Center (BTSC - see box below), has
prepared this document to highlight methods and strategies that have been successfully used to procure
services under a Triad framework.  The document includes examples and lessons learned from actual
Triad projects implemented in the federal, state, local, and private sector arenas.
U.S. Environmental Protection Agency
Office of Solid Waste and Emergency Response
Brownfields and Land Revitalization Technology Support Center     1

-------
          Understanding Procurement for Sampling and Analytical Services Under a Triad Approach


Document Purpose and Scope


The purpose of this document is to provide project managers, technology service providers, regulators,

and other interested parties with information and examples that may be useful in developing and

implementing Triad-specific procurement approaches.  The information is based on the actual experiences

of federal, state, local, and private sector parties in working within their procurement systems to

implement Triad projects. The document is intended for a wide audience, including federal, state, and

local government agencies as well as the private sector, and includes examples from each. This document

is not intended to be a comprehensive guide to procurement and in no way revises or supersedes any

official procurement regulations or requirements.  Rather, it is intended to provide an overview of

strategies and approaches that have been used to procure services under a Triad framework.


In this document, the procurement processes are discussed in general terms that are intended to be broadly

applicable to a wide audience.  It  is important to note that each procuring entity has its own specific

regulations and requirements and that the terms used in an actual procurement will be specific to that

entity. Furthermore, the specific requirements of an actual procurement will be determined on a case-by-

case basis subject to the regulations and requirements of the procurement entity - including the Federal

Acquisition Regulations (FAR) for the federal government (www.arnet. gov/far) - and the applicable

requirements of states, local governments, and the private sector.
  About the Brownfields and Land Revitalization Technology Support Center
  EPA established the BTSC (www.brownfieldstsc.org) to ensure that decision-makers are aware of the full range
  of technologies available for conducting site assessments and cleanups and can make informed decisions about
  their sites. The center can help decision-makers evaluate strategies to streamline the site assessment and cleanup
  process, identify and review information about complex technology options, evaluate contractor capabilities and
  recommendations, explain complex technologies to communities, and plan technology demonstrations. The
  center is coordinated through EPA's Office of Superfund Remediation and Technology Innovation (OSRTI) and
  offers access to experts in EPA's Office of Research and Development (ORD) and other federal agencies such as
  the U.S. Department of Defense (DoD) and Department of Energy (DOE).  Localities can submit requests for
  assistance through their EPA Regional Brownfields Coordinators, online; or by calling (877) 838-7220 toll free.
  For more information about the BTSC, contact Dan Powell of EPA at (703) 603-7196 or powell.dan@epa.gov.
  Publications developed through the BTSC include:
      "Road Map to Understanding Innovative Technology Options for Brownfields Investigation and Cleanup,
      Third Edition"
      "Assessing Contractor Capabilities for Streamlined Site Investigations"
      "Directory of Technical Assistance for Land Revitalization"
      "Brownfields Technology Primer:  Requesting and Evaluating Proposals That Encourage Innovative
      Technologies for Investigation and Cleanup"
  •    "Brownfields Technology Primer:  Using the Triad Approach to  Streamline Brownfields Site Assessment
      and Cleanup"
      "Brownfields Technology Primer:  Selecting and Using Phytoremediation for Site Cleanup"
U.S. Environmental Protection Agency
Office of Solid Waste and Emergency Response
Brownfields and Land Revitalization Technology Support Center     2

-------
         Understanding Procurement for Sampling and Analytical Services Under a Triad Approach


Overview of Programs for the Triad


The Triad approach has been used or is well suited for implementation at all types of contaminated sites,

including the examples provided below and other site types such as sites with underground storage tanks.
    •  Brownfields:  The Triad is well suited for use in assessing and cleaning up Brownfields sites by a
       wide range of property owners, including state and local governments. Under EPA's Brownfields
       program, property owners can apply for funding from the Brownfields Site Assessment or
       Cleanup Revolving Loan Fund program when they plan to use innovative technologies and
       strategies such as the Triad. For more information, visit EPA's Brownfields Web site at
       www.epa.gov/brownfields.

    •  Superfund: EPA's OSRTI is promoting the use of the Triad approach at Superfund sites. The
       approach can be used during all portions of the Superfund remedial action, from remedial
       investigation (RI) through remedial design (RD), remedial action (RA), and operation and
       maintenance (O&M). With the appropriate level of quality control (QC) and documentation, data
       of the quality necessary to support most decisions can be generated in the field. For more
       information, visit the EPA Superfund Web site for dynamic field activities at
       www. epa.gov/superfund/programs/dfa.

       In addition, the Triad can be used for Superfund removal actions.  Because of the need to move
       quickly and mitigate immediate threats to human health and the environment during removal
       actions, innovative approaches such as the Triad are well suited for these types of actions. EPA's
       Environmental Response Team (ERT) has been a leader in developing data and information tools
       to assist project managers with removal actions and expedited approaches to support these
       actions, including the Triad. For more information, visit the  ERT software support Web site at
       www.ertsupport.org/.

    •  Resource Conservation and Recovery Act (RCRA) Corrective Action:  Innovative sampling
       and analysis strategies such as the Triad work well at RCRA sites undergoing corrective action
       and can be applied from the site assessment process through  design and implementation of
       corrective measures. For more information, visit the RCRA  corrective action Web site at
       www.epa.gov/epaoswer/hazwaste/ca/index.htm.

    •  State-Lead Programs: Many state-lead programs are integrating innovative approaches into
       environmental cleanups. State voluntary cleanup programs (VCP) and state Superfund programs
       are pioneering the use of the Triad approach. They offer mobile laboratory services to local
       governments, and in some cases to potentially responsible parties (PRP), in order to expedite site
       characterization and allow decision-making on a real-time basis.  For example, the State of
       Florida's Dry Cleaner Remediation Program offers assistance to site owners for the cleanup of
       dry cleaning sites using direct-push technologies and field-based measurement systems coupled
       with a pollution prevention program.

    •  Private Sector: The private sector has been a leader in implementing innovative  sampling and
       analytical strategies such as the Triad on a broad range of projects. These efforts have included
       use of field-based site characterization technologies and dynamic work strategies to decrease
       uncertainty while reducing overall project costs.
U.S. Environmental Protection Agency
Office of Solid Waste and Emergency Response
Brownfields and Land Revitalization Technology Support Center

-------
         Understanding Procurement for Sampling and Analytical Services Under a Triad Approach


Document Organization


Section 2 of this document discusses approaches and strategies that have been successfully used to

procure sampling and analytical services under a Triad approach. Section 3 presents six examples of

recent procurement experiences under a Triad framework from federal, state,  local, and private sector

projects.  Additional detailed information is provided in related Web sites (referred to in this document as

attachments). These are described in Table 1-1, and include the  following:


A     Triad Overview
B     Overview of Field-Based Measurement Technologies
C     Pertinent Resources
D     Glossary
E     McCormick and Baxter Site Information
F     Wenatchee Tree Fruit Site Information
G     Florida Department of Environmental Protection Program Information
H     Ohio Environmental Protection Agency (Ohio EPA) Program Information
I      Assunpink Creek, Trenton, New Jersey, Project Information
J      Lake Success Business Park (DuPont) Project Information
U.S. Environmental Protection Agency
Office of Solid Waste and Emergency Response
Brownfields and Land Revitalization Technology Support Center     4

-------
          Understanding Procurement for Sampling and Analytical Services Under a Triad Approach
             Table 1-1. Additional Information Related to Procurement in Attachments
        Attachment
       Description
                  Location
 A - Triad Overview
Provides an overview of the
key concepts, requirements,
and benefits of the Triad
approach, including a brief
summary of the Triad
approach.	
http://www.triadcentral.org/over/index.cfm
 B - Overview of Field-
     Based Measurement
     Technologies
Provides a summary of
information about selected
sampling technologies such
as direct push technologies
and techniques, and field-
based measurement
technologies that can be
used under a Triad
approach.	
http://www.triadcentral.org/tech/index.cfm
 C - Pertinent Resources
Provides information on
references and resources
about procurement and
innovative technologies
related to the Triad
approach.	
http://www.triadcentral.org/ref/index.cfm
 D - Glossary
Provides descriptions of key
terms used in this document.
http://www.triadcentral.org/gloss/index.cfin
 E - McCormick and Baxter
     Site Information
Includes the scope of work
used to procure sonic
drilling services for this site.
http://wwiv.brownfieldstsc.org/procurement ex.cfm
 F - Wenatchee Tree Fruit
     Site Information
Includes two versions of a
case study (one by EPA and
one by the U.S. Army Corps
of Engineers [USAGE])
about the site investigation
and cleanup. Also included
are the field sampling plan
(FSP), quality assurance
project plan (QAPP), and
remedial action
management plan (RAMP)
for the site.
http://wwiv.brownfieldstsc.org/procurement  ex.cfm
 G - Florida Department of
     Environmental
     Protection Program
     Information
Includes materials used to
solicit contractors for the
Dry Cleaner Remediation
Program, including example
rate categories.	
http://www.brownfieldstsc.org/procurement ex.cfm
U.S. Environmental Protection Agency
Office of Solid Waste and Emergency Response
Brownfields and Land Revitalization Technology Support Center

-------
          Understanding Procurement for Sampling and Analytical Services Under a Triad Approach
       Table 1-1.  Additional Information Related to Procurement in Attachments (continued)
        Attachment
       Description
                  Location
 H - Ohio EPA Program
     Information
Provides background
information about the Site
Investigation Field Unit
(SIFU) program as well as
materials about one site
investigated by the SIFU.
http://wwiv.brownfieldstsc.org/procurement ex.cfm
 I - Assunpink Creek,
    Trenton, New Jersey,
    Project Information
Includes the request for
proposal (RFP) used by the
City of Trenton to procure
Triad investigation  services
for the site as well as the
dynamic work plan used to
guide the investigation.
http://wwiv.brownfieldstsc.org/procurement ex.cfm
 J - Lake Success Business
    Park (DuPont) Project
    Information
Includes a case study about
the use of X-ray
fluorescence (XRF) field
analyses at the site.
http://www.brownfieldstsc.org/procurement ex.cfm
U.S. Environmental Protection Agency
Office of Solid Waste and Emergency Response
Brownfields and Land Revitalization Technology Support Center     6

-------
          Understanding Procurement for Sampling and Analytical Services Under a Triad Approach
        2.0     APPROACHES AND STRATEGIES FOR PROCURING SAMPLING AND
                   ANALYTICAL SERVICES UNDER A TRIAD APPROACH
There are many avenues for success in procuring services under a Triad approach.  Keys to success

include understanding the Triad-specific needs of the procurement, working with the procurement

officials from the start to identify the best procurement method for the specific project, and understanding

that flexibility and adaptability are crucial to successful implementation of the Triad. This section

provides information about successful procurement approaches and strategies that have been used by a

wide range of entities, including federal, state, and local agencies as well as the private sector.  The

approaches and strategies are based on experiences and lessons learned in procurement efforts, and the

discussion includes information about potential procurement barriers and key considerations.  It is

important to note that the information presented in this section is not official guidance and does not revise

or supersede any official government or other procurement regulations or requirements (see box about

additional information on performance-based contracting to be provided at a later date).
  Performance-Based Contracting
  Recently, performance-based contracting (PBC, also known as performance-based service contracting) has seen
  an increase in use for procurement of sampling and analytical services. PBC is a procurement strategy that
  structures all aspects of an acquisition around the purpose of the work to be performed as opposed to the manner
  in which the contractor must perform the work or the processes that must be used. This strategy leverages the
  ingenuity of industry while providing the government with access to the best commercial products, services, and
  processes. Use of PBC strategies reduces acquisition cycle time and costs because contractors are not compelled
  to meet detailed, design-type specifications that inhibit creativity and efficiency.  Use of the Triad approach is
  generally consistent with PBC concepts.  EPA is planning a separate publication as a supplement to this report
  that will address the interrelationships between PBC and Triad.
2.1     TRIAD-SPECIFIC CONSIDERATIONS


As discussed in Section 1.0, the Triad involves three main components: (1) systematic project planning,

(2) dynamic work strategies, and (3) real-time measurement technologies. The Triad involves a change in

paradigm for site characterization and cleanup - moving from a traditional, step-by-step approach that

involves standard processes, often with multiple mobilizations, to an innovative, dynamic approach that is

flexible and adaptable and that minimizes the number of mobilizations.  The dynamic approach allows

decisions and strategies to be refined in the field in response to data generated using real-time

measurement technologies. This approach encourages innovation within the context of sound planning to

improve decision-making, reduce mobilizations, and reduce overall project costs and timelines.  Most

procurement methods (discussed in more detail below) are intended to accommodate the more traditional

approach to site characterization and cleanup under which projects are designed to be performed in

U.S. Environmental Protection Agency
Office of Solid Waste and Emergency Response
Brownfields and Land Revitalization Technology Support Center    7

-------
         Understanding Procurement for Sampling and Analytical Services Under a Triad Approach


specific steps, with the elements associated with each step (such as sampling locations, number of

samples, and analytical methods) relatively well defined.


The traditional approach generally requires a separate procurement or work plan for each step.  Under the

Triad approach, the services for an entire project or the major components of the project may be obtained

under one procurement or work plan. The following Triad-specific considerations are important to

successfully procuring services under a Triad framework:


    •   The three components of the Triad approach - systematic project planning, dynamic work
        strategies, and real-time measurement technologies
    •   Unit costs
    •   Flexibility


Three Components of the Triad Approach


The three components of the Triad approach are summarized below and are described in detail at
www- .triadcentral.org.
    •  Systematic Project Planning includes development and maintenance of a conceptual site model
       (CSM) that defines project goals and decisions to be made, identifies the type and quality of data
       to be collected, and determines how the data should be collected. Development of a systematic
       plan involves discussions with appropriate parties such as regulators, site representatives, and
       members of the local community. These discussions are important to the development of a well-
       defined, systematic plan and associated planning documents that are accepted by all involved.
       The CSM describes the likely conditions at the site based on existing information, identifies the
       uncertainties associated with the site, and provides the basis for designing data collection
       programs to reduce the uncertainties. The CSM can be used to provide an upper estimate of
       potential costs based on a contingency analysis of the uncertainties and can be used to help define
       the most appropriate contract mechanism for the project. Systematic planning maximizes the use
       of existing data and information to identify critical decisions and related  data gaps.  It is also used
       to identify logically related activities that in turn can be used to  identify unit costs for activities
       within a given task. The planning process involves developing strategies and decision trees that
       are used to implement the  statement of work (SOW) in the field and is essential to the Triad
       approach.  As such, in any work plan or SOW, it is important to provide  the scope, budget, and
       resources needed to conduct systematic project planning.

    •  Dynamic Work Strategies include the logical progression of activities that will be used to
       achieve project goals. Work planning  documents written in a dynamic or flexible mode guide the
       course of the project and are adapted in real time (for example, while the work crew is still in the
       field) as new information becomes available.  This process allows the preliminary CSM to be
       tested and refined in order to support the desired level of decision confidence in real time, saving
       time and money while supporting resolution of uncertainties and QC more effectively than work
       plans written in a static mode. (EPA's Emergency and Rapid Response Services [ERRS]

U.S. Environmental Protection Agency
Office of Solid Waste and Emergency Response
Brownfields and Land Revitalization Technology Support Center     8

-------
         Understanding Procurement for Sampling and Analytical Services Under a Triad Approach


       contracts generally operate on the principle that if and when a contractor arrives on site to
       perform work and finds that conditions have changed, the contractor, through coordination with
       the On-Scene Coordinator [OSC], can make a change as to how the site is addressed.) Dynamic
       investigations using direct-push methods and associated innovative technologies, which are
       common with the Triad, have tended to work best when a variety of detailed optional tasks are
       built into a contract.  Depending on the project  scope and the size of a task, unit costs can be
       developed based on hourly rates, daily rates, half-daily rates, or the number of feet or holes
       drilled. If units of time (hourly/daily/half-daily) are used, minimum performance requirements
       (for example, assumed daily efforts in terms of number of feet drilled, holes installed, or samples
       collected) can be built into daily rates based on a well-defined scope and/or site knowledge.
       Additional unit costs for sample collection, materials, standby time, minimum daily charges, and
       overtime may need to be addressed.  Minimum quantities should be estimated for each unit cost
       and option.

    •  Real-Time Measurement Technologies include sampling and analytical services that allow
       decisions to be made on a real-time basis while the work crew is still in the field.  Real-time
       measurement involves  field-based technologies that can provide real-time or near real-time
       delineation of site geology, hydrogeology, and contaminant distributions. For example, direct-
       push technology has become a preferred platform for housing in situ analytical data collection
       and sampling tools. (See Attachment B for further information about field-based technologies.)
       Real-time measurements can be performed by mobile laboratories as well as fixed laboratories
       that have quick turnaround times. In all cases, the level of quality assurance and quality control
       (QA/QC) required for the measurement technologies (as defined in the systematic plan) needs to
       be considered in the SOW along with the limitations of the technologies and contingency plans to
       address these limitations. For example, when higher levels of QA/QC are needed, the sample
       throughput is usually reduced, which can increase per sample costs.  Use of real-time
       measurement technologies also includes use of appropriate decision support tools to manage
       sampling and analytical data at the site. Examples of decision support tools used for Triad
       projects include Field EnvironmentaL Decision Support (FIELDS) and  Spatial Analysis Decision
       Assistance (SADA). Further information about these tools is available in "Using the Triad
       Approach to Streamline Brownfields Site  Assessment and Cleanup" (EPA 542-B-03-002, June
       2003), which is available through www.brownfieldstsc.org.


Unit Costs
In a Triad procurement, a "unit" is defined as a discrete activity that can be used as a basis for estimating

and tracking costs for a project.  Unit costs for services and equipment are site-specific and need to be

customized to meet the specific needs of the project.  For example, a unit cost for a particular type of field

analysis could incorporate the daily rate for the equipment, personnel time, and mobilization costs and

might specify a minimum number of samples to be analyzed in order to qualify for billing at a

predetermined rate. Activities that will be repeated during the course of a project are well suited for unit

costs. For example, a unit cost for instrumentation that provides a continuous view of the subsurface

could be developed based on a daily or weekly rate. Alternatively, if a particular geologic setting is not

well understood and flexibility is needed to further define site conditions, a unit cost based on linear

footage may be  more suitable. A planning process that allows decision-makers to understand the specific

U.S. Environmental Protection Agency
Office of Solid Waste and Emergency Response
Brownfields and Land Revitalization Technology Support Center     9

-------
          Understanding Procurement for Sampling and Analytical Services Under a Triad Approach


services and equipment to be provided and the associated "units" is essential for a successful

procurement.


Examples of activities that are well suited for unit costs include the following:
        Direct-push and drilling programs (rates based on a unit-time with a stated minimum footage, as
        discussed in the box below)
        Leasing of geophysical technologies (units based on hourly or daily rates, per acre rates, or per
        foot rates)
        Portable analytical methods such as Hach ferrous iron test kits and the Photovac Snapshot Gas
        Chromatograph for air or vapor monitoring (rate based on number of samples analyzed)
        Contracting of field analytical services (rate based on number of hours of operation)
        Mobile gas chromatography (GC) laboratories (rates generally cover all equipment, consumables,
        data reporting, and QA/QC and are based on number and type of samples)
  New Mexico Department of Transportation - Unit Cost Approach for Direct-Push Work
  The New Mexico State Highway and Transportation Department District 1 Headquarters site in Deming, New
  Mexico, was contaminated with 1,1,1-trichloroethane (TCA) that had been disposed of in a septic system.  This
  was a state-lead site with a prime contractor serving as project manager and two subcontractors supporting the
  investigation. Borehole investigations were performed by a geophysical subcontractor using direct-push
  technology.  The direct-push work was priced at a daily rate, not including mobilization and demobilization
  costs. The direct-push costs included the daily rate, overtime hours if required, per diem, and unit prices for a
  number of consumables. The project was conducted under a time and materials contract with a not-to-exceed
  value.  Through use of unit rates for consumables and a preprinted form for tracking materials used at each
  location, the costs per borehole could be closely monitored. The unit rates allowed the project manager to
  readily tabulate how the actual costs compared with the budget on a daily basis.
Flexibility


Because the complete scope for dynamic site investigation and cleanup projects cannot always be fully

anticipated, contracts and agreements between technology contractors and project teams should address

criteria for scope modification so that investigations can be quickly adapted in response to field

conditions and data. Development of options and unit rates based on the anticipated data needs of a

project will increase the flexibility of a procurement as well as the efficiency of the project.  Successful

projects involve:


    •   Clear decision criteria for ceasing or continuing to collect data (in the form of decision trees or
        investigation flow charts)
    •   Clear methods and lines of communication to facilitate rapid decision-making
    •   Clear understanding of the cost implications of scope changes and of how optional tasks will be
        triggered and managed
    •   Real-time meetings to discuss  unanticipated situations or problems encountered
U.S. Environmental Protection Agency
Office of Solid Waste and Emergency Response
Brownfields and Land Revitalization Technology Support Center    10

-------
         Understanding Procurement for Sampling and Analytical Services Under a Triad Approach

    •  Coordination between contractors and vendors on a real-time basis to ensure the availability of
       resources
    •  A rationale for "ranges" of samples to be collected and analyzed
    •  Clear decisions based on how sampling locations may be determined and revised in the field

2.2    OVERVIEW OF PROCUREMENT APPROACHES FOR TRIAD SERVICES

Procuring services for a project under a Triad framework depends on a number of factors, including the
complexity of the project, end use considerations for the site, budget and schedule requirements, whether
an existing contract vehicle is available or a new contact is needed, and the specific procurement
requirements and regulations, which will vary depending on whether the procurement is performed by a
federal or nonfederal government agency or by the private sector.

This section provides information about approaches and strategies that have been successfully used to
procure services under the Triad (see Section 3 for example case studies).  It is important to note that the
specific type of contract used and its terms and conditions will depend on the specific requirements of the
project, the specific entity procuring the services, and the governing procurement regulations and
requirements.

As discussed in Section 1, this document is intended to provide a broad overview of procurement
approaches based on actual experiences under the Triad approach. As such, the terminology used in the
document is intended to be generally applicable across the federal, state, local, and private sectors.
Therefore, the terminology is not specific to a particular procurement entity or body of regulations (for
example, the FAR) and is intended to provide only an overview of ideas and methods for procuring Triad
services in a broad arena.

Overview of Contract Types for the Triad

Triad services have generally been procured under fixed-price and cost-reimbursable types of contracts.
The decision about the type of contract to be used will be project-specific, depending on a number of
factors such as how well defined the scope and schedule of the project are, the type of contingencies
expected, and requirements specific to the procuring entity.  In general, cost-reimbursable contracts are
used when there is greater uncertainty regarding the scope of the project.  Under this type of contract, the
contractor is reimbursed based on actual costs at a negotiated rate and fee. Fixed-price contracts are
generally used when there is  less uncertainty regarding the scope of the project. Under a fixed-price

U.S. Environmental Protection Agency
Office of Solid Waste and Emergency Response
Brownfields and Land Revitalization Technology Support Center     11

-------
          Understanding Procurement for Sampling and Analytical Services Under a Triad Approach

contract, the contractor is paid a set amount to complete a specific scope of work based on an agreed-
upon price. As such, for Triad-type projects, smaller projects with lower costs and fewer scope
uncertainties tend to lend themselves to fixed-price contracts, and relatively large projects with greater
scope uncertainties tend to lend themselves to cost-reimbursable contracts. There are several variations
on these types of contracts. Fixed-price contracts may be nonnegotiable, such as in firm-fixed-price
contracts, or may include incentives,  such as in fixed-price-incentive contracts.  Cost-reimbursable
contracts include cost-plus-fixed-fee, cost-plus-award-fee, and cost-plus-incentive-fee contracts, with the
terms for payment of the fee defined by the contract.

Contracts can be further defined by their schedule and quantity requirements.  Within the government,
contracts include:  (1) definite-quantity contracts, which specify the quantity of supplies or services to be
delivered within a  fixed time period;  (2) requirements contracts, which provide for filling defined
purchase requirements for supplies or services during a contract period by placing orders;  and
(3) indefinite-quantity contracts, also known as task order or delivery order contracts, which provide for
obtaining an indefinite quantity, within stated limits, of supplies or services within a fixed period.
Government indefinite delivery/indefinite quantity (ID/IQ) contracts are especially well suited for
procuring Triad services.  ID/IQ contracts give the buyer flexibility in both the quantity of services to be
procured and the scheduling of those services while  controlling overall budgets and schedules through the
specific terms and  conditions identified in each task or delivery order.

As discussed above, the dynamic nature of the Triad requires contract flexibility (in order to allow for a
dynamic work strategy and real-time decision-making), while contract integrity is maintained and the
specific requirements and applicable regulations  of the procuring entity are met. Therefore, a key to
success in determining whether a given contract vehicle is suitable for procuring services under the  Triad
for a specific project is to involve the contracting staff in identifying the best contracting avenue. For
example, within the federal government, the Contracting Officer can be a valuable asset in identifying
innovative aspects of a contract mechanism and can provide  specific information about how a contract
vehicle could be used for procuring services  under the Triad. The Contracting Officer should be actively
involved in the planning process and in identifying the most  appropriate procurement strategy. The
Navy's Alpha Contracting program (see text box) illustrates the advantages of working as a team to
identify the best contracting solution  for a specific project  requirement.
U.S. Environmental Protection Agency
Office of Solid Waste and Emergency Response
Brownfields and Land Revitalization Technology Support Center     12

-------
          Understanding Procurement for Sampling and Analytical Services Under a Triad Approach
  Example of Federal Agency Process for Identifying Contracting Solutions - Alpha Contracting
  Alpha Contracting streamlines the acquisition process for the Navy and reduces the cycle time for contracts. It
  emphasizes conducting actions concurrently and maintaining a close relationship between an integrated
  government team and contractors. For example, under Alpha Contracting, the government and contractors may
  work together to develop a solicitation package that meets the government's needs while addressing contractor
  questions or concerns. Similarly, as the contractors complete portions of their technical and cost proposals, an
  integrated government team, including representatives of the program office, the contracting office, the contract
  administration office, and the Defense Contract Audit Agency (DCAA), may review the proposals and attempt
  to resolve issues that the team identifies. When the completed proposals are then formally submitted to the
  Contracting Officer, much of their content may have already been negotiated. This approach is likely to result in
  an optimized program with an achievable scope, improved performance and quality, and avoidance of non-
  value-added requirements as well as a lower overall cost than what was originally contemplated.
  Source: http://www.abm.rda.hq.navy.mil/navTaos/content/view/full/132
Using a Two-Part Approach to Procuring Triad Services

Another way to procure services under a Triad framework is to use a two-part approach in which the up-
front planning is procured as a separate activity from the field implementation services. For example, a
local government agency may be planning to redevelop a Brownfields site in the community but lack the
technical staff needed to prepare a detailed, systematic plan. In this case, the local government may
choose to obtain the services of one organization to prepare a systematic plan and another organization to
implement the plan, including the dynamic work strategies and real-time measurement technologies.
Segmenting work in this way may involve use of a federal agency such as USAGE to help develop the
systematic plan followed by a local  contractor that would implement the plan. This type of approach was
used at the Wenatchee Tree Fruit site discussed in Section 3 of this document. When there is an existing
contract mechanism available, an example of the two-part approach would be to segment the work as two
separate task orders or delivery orders. The planning phase would be conducted and then, based on the
plan developed, the field implementation portion would be performed as a separate task. This approach
provides the flexibility to have the same contractor perform both parts of the work if it possesses the full
range of technical expertise needed  (if allowed by the governing procurement regulations) or to tap into
two contractors with appropriate expertise using different vehicles.

The two-part approach to procuring Triad services provides the buyer with several advantages, including:
(1) the ability to procure the technical expertise needed to develop a plan of sufficient technical detail for
the SOW in order to procure field services, and (2) the ability to increase competition for the work by
allowing a broader universe of contractors to bid on the field work component. A two-part approach also
addresses cases where different contractors have different skills. For example, a contractor may be
qualified to conduct the field work but not possess the expertise needed to perform the planning

U.S. Environmental Protection Agency
Office of Solid Waste and Emergency Response
Brownfields and Land Revitalization Technology Support Center    13

-------
          Understanding Procurement for Sampling and Analytical Services Under a Triad Approach

component of the work. Likewise, a contractor may be qualified to do the planning but not to conduct the
field work. In such cases, the buyer can first target firms with expertise in systematic planning and can
then use the resulting SOW in soliciting firms with expertise in the field aspects of an investigation.

Using Fixed-Unit Costs

It is important that a buyer design the SOW or contract to ensure cost-effective procurement and project
implementation. One way to accomplish this is to group activities at the task level so that bidders can
provide fixed-unit costs (in contracting, sometimes referred to as firm-fixed price charged on a per unit
basis). This approach can be used within both fixed-price and cost-reimbursable types of contracts (refer
to example in Section 3.1.1). Providing specific base bid and optional tasks and requesting fixed-unit
costs for logically related tasks allow the buyer to allocate funds appropriately. Requesting fixed-unit
costs for logically related activities or tasks also allows decision-makers to identify where cost savings
can be realized.  Knowing what the tasks are, the buyer can estimate expenditures throughout the life of
the project.

As the project is implemented, fixed-unit costs for optional activities allow decision-makers to control
costs because they will pay only for the activities conducted. A fixed-unit cost contract based on options
allows the buyer and contractor to share the risk of project implementation while providing an incentive
for the contractor to achieve the task goals efficiently.

Sections 2.3 and 2.4 discuss  strategies for procuring services under a Triad framework for new and
existing contracts, respectively. Figure 2-1 illustrates the basic procurement processes under a Triad
approach. For the purposes of this document, the term "buyer" is used as a generic term for the procuring
entity, and the term "contractor" is used as a generic term for the entity providing services, consumables,
or equipment. For an actual procurement, the specific terms will be dictated by the procuring entity.
U.S. Environmental Protection Agency
Office of Solid Waste and Emergency Response
Brownfields and Land Revitalization Technology Support Center    14

-------
I

I
1
1

i
I

3
1
        o
        O

        I
 x
LU
 k.
 (D
        (D
 u

 E
a.

 i

 o
 o


 o
(0
         Q.I * *



         < 3
                     §l  e
                    0 J2. Q
             I
o 8
§ o
a, -a

ro
=
               CM

               Tf

               c\i

             S =
             ro o

             E «
IlilS
                  01  S
              >- o
              O S3 --~
              § o T

              o S2- CM
    U)


C* O ° ^


» t5 « c
X CO OT O
^J i: -D '•=
Q) C (Q JrJ

OT ° '= £
3 O I- J2.
               "o
                         C
                         O

                         O

                         D)
                         C
                         X
                         LU
                             03
                             -i—•
                             C
                             o

                             O
                                               (D
                                                         01 ^
                                          



                                      z£'E S
                                      Q. t3 « C
                                      £ ro OT .o
                                      Tit .u ^^
                                                        ai
                                                        a   -c -5

           D)

           .£ ^

                                                re
                                                £ -o .2
                                                .^i ^^ i_
                                 t   ^^
                                 = 03 >c>r
                                 0 re I- oj

                                    '=S =
                                      re .2
                                        5  o g.
                                        ^  *- o £J
                                        T^  «- ^- *^  T:

                                        |SSi|
                                        §  w < o  J2.
                                                              o
                                                              +j
                                                              u
                                                              (0
                                                              Li.
                                                              (D
                                                              U
                                                              U
                                                              3

                                                              (0


                                                              (D
                                                           r
                                                           0)
                                                           Q.
                                                           X
                                                           LU
                                                                            o
                                                                            'E
                                                                            o
                                                                            0)
                                                                    fc
                                                                    re
                                                                    +*
                                                                    V)

                                                                    O)
                                                                  0) C

                                                                  w '•=
                                                                 s c
                                                                  c o
                                                                 D O
                                                                                                      o

                                                                                                      a
                                                                                             U OJ3



                                                                                             §•§

                                                                                                   -
                                                                                                   •Si 5
                                                                                                   "
                                                                                                   g s
                                                                                                      -a

                                                                                                   S 3 §
                                                                                                    SB S

-------
          Understanding Procurement for Sampling and Analytical Services Under a Triad Approach


Involving the Contracting Officer in Systematic Planning


The Contracting Officer is a crucial member of the project team that develops the systematic project plan.

Once the Contracting Officer gains an understanding of project requirements, he or she can help identify

capabilities within existing contract vehicles as well as contract terms and conditions to support use of the

Triad approach. The Contracting Officer also can help design work plans that meet contract requirements

and can identify potential problems early to help avoid delays in gaining work plan approval.
  Special Procurement Considerations for EPA- and USACE-Lead Projects
  EPA- and USACE-lead projects sometimes involve specialized types of procurement for selected equipment or
  services or acquisition of equipment or services without a formal procurement. For example, EPA and USAGE
  can gain access to the DoD site characterization and analysis penetrometer system (SCAPS) unit without the
  need for a separate procurement.  The SCAPS is a direct-push unit that is fitted with various tools such as a
  laser-induced fluorescence (LIF) sensor to identify the presence of petroleum, oil, and lubricants (POL).  At the
  McCormick and Baxter Superfund site in Stockton, California, the SCAPS unit was used to obtain soil samples,
  support interpretation of LIF results, and install small-gauge wells for groundwater sampling.  The services of
  the DoD SCAPS unit were obtained for this site using a military interdepartmental purchase request (MIPR) and
  an interagency agreement through the USAGE Tulsa District. This project also is an example of USAGE
  performing systematic planning separate from procurement of field services.

  Selected laboratory services also can be obtained by EPA or USAGE without the need for a separate
  procurement. For example, for the McCormick and Baxter site, laboratory services were obtained from a
  combination of the EPA Region 9 laboratory, the EPA Kerr Laboratory, and several private sector laboratories.
  USAGE could access the services of the EPA Region 9 laboratory with no project-specific contracting
  requirements because the project was supported by EPA.  The EPA laboratories and their associated capabilities
  were accessed through an EPA Environmental Services Assistance Team (ESAT) contract. For the McCormick
  and Baxter site, use of the government laboratories gave the project team flexibility in requesting laboratory
  method modifications and accelerated the characterization process; additional information about the site is
  provided in Section 3. This type of procurement option may be relevant to state and local sites for which state
  and federal laboratories are available to provide assistance.
2.3     PROCURING TRIAD SERVICES USING A NEW CONTRACT


When a new contract must be developed to obtain Triad services, the specific contract type selected and

the specific requirements and regulations for the procuring entity will dictate how the procurement is

accomplished.  This section provides a general overview of how Triad services have been procured under

new contract vehicles. New contracts are often used by state and local governments to secure services on

a site-specific or project-specific basis when they do not have broader environmental support service

contracts in place. It is important to note that this  section does not focus on any one type of contract

mechanism or procurement entity; rather, it illustrates some of the general aspects of procurement under a

Triad approach using a new contract. In the case of a new contract, the buyer needs to identify the type of

contract to be used for the procurement (fixed-price, cost-reimbursable, or a variation) based on project-

U.S. Environmental Protection Agency
Office of Solid Waste and Emergency Response
Brownfields and Land Revitalization Technology Support Center    16

-------
          Understanding Procurement for Sampling and Analytical Services Under a Triad Approach

specific considerations, including Triad-specific elements (see Section 2.1).  The contracting staff within
the procuring organization can assist with identification of the type of contract mechanism that best meets
the needs of the buyer. With a new contract, an RFP is generally developed by a team that includes the
technical buyer, contracting staff, and technical experts and is then used to solicit contractor proposals for
the project.  The team then evaluates the proposals and selects a contractor for the project.

In some cases, the buyer may have a pre-approved list of contractors for certain types of solicitations.  For
example, in the private sector, a company may have a list of preferred contractors and may have
established master services agreements (MSA) with specific contractors.  In the case of the government,
an agency may have established basic ordering agreements (BOA) with various contractors to obtain
specific types of services.  Often MSAs and BOAs have pre-established terms and conditions that help
streamline procurement. In such cases, a contractor will need to have been pre-qualified in order to bid
on certain types of projects.

2.3.1      Identifying a Contract Type and Solicitation Method

As discussed above, there are two basic types of contracts - fixed-price and cost-reimbursable - that have
been used to procure Triad services. General considerations in  selecting the contract type include:
    •   Project size and complexity
    •   Type and level of uncertainty about the scope of the project
    •   Specific characteristics and requirements of the project
    •   Special considerations for the project
The procurement process is usually competitive.  In a competitive bid scenario, the RFP is sent to
multiple contractors and the winning contractor is selected based on a set of evaluation factors for
contract award.  Occasionally a sole source contract will be awarded directly to a specific contractor.  The
determination of whether a contract is bid on a competitive basis or awarded on a sole source basis is
made by the procurement entity in accordance with applicable requirements and regulations. For
government agencies, the use of sole source contracts is generally limited and requires extensive
justification (for example, FAR Part 6 delineates the exact requirements for implementing a sole source
contract).  The ability to award a sole source government contract may be limited by the value of the
contract. The text box below provides an overview of the competitive bidding and sole source selection
requirements of the federal government; in addition, the box provides information about use of an
independent government cost estimate (IGCE)  and use of preferential programs such as set-asides.

U.S. Environmental Protection Agency
Office of Solid Waste and Emergency Response
Brownfields and Land Revitalization Technology Support Center    17

-------
          Understanding Procurement for Sampling and Analytical Services Under a Triad Approach
  Overview of Federal Government's Competitive Bidding and Sole Source Selection Requirements
  Competitive Bidding System:  The Competition in Contracting Act (CICA) of 1984 established "full and open
  competition" as the primary goal of federal government procurement. CICA also revised the protest procedures
  and discouraged sole source procurement by requiring procurements that use methods other than full and open
  competition to be justified and approved. FAR Part 6 sets forth the competition requirements for federal
  contracts. By receiving offers from multiple contractors, the buyer can compare  and contrast proposed technical
  designs and assess the reasonableness of costs.  Competitive procurement may also provide for discussions or
  negotiations with bidders found to be within the competitive range. Competitive procurement concludes with
  the award of the contract to the bidder whose proposal is most advantageous considering the price and the other
  evaluation factors included in the solicitation.  The procedure is contained in FAR Parts 6 and 15.

  Sole Source Selection Procedure:  Under government contracts, sole source procurement procedures can
  generally be used if there is only one source known to be able to perform a contract or if a single source is
  uniquely qualified for contract award as discussed in the FAR. For example, a contractor might have  highly
  specialized skills, or a vendor might have unique equipment and staff required to collect the data needed. The
  basis for a sole source selection must be documented and, depending on the specifics of the work, must be
  published on the Federal Business Opportunities (FedBizOpps) web procurement portal (www.fedbizopps.gov').
  Further information about FAR requirements is available at http://www.amet.gov/far/.

  Independent Government Cost Estimates
  For many procurements, there is a need to develop an IGCE. For many federal procurements, the organization
  that is soliciting services must prepare an IGCE before issuing a solicitation. The IGCE is used by the
  contracting department in its evaluation of proposals to help make the contract award decision and in performing
  cost negotiations.

  Preferential Treatment in Contracting
  For some contracts, the organization that is soliciting services will consider whether there is an opportunity to
  reserve some or all of a contract for a small or disadvantaged business. For example, the federal government
  maintains rigorous goals and procedures for identifying these types of contracting opportunities (sometimes
  referred to as set-asides).  In the past, preferential treatment has been provided for businesses whose size is
  below specified criteria (for example, in terms of annual revenue or number of employees) or whose ownership
  is associated with specified disadvantaged segments, such as woman-owned, veteran-owned, or service-disabled
  veteran-owned.
2.3.2       Preparing a Request for Proposal Under the Triad


An RFP typically includes a SOW, instructions for preparing the proposal, a schedule, and terms and

conditions.  For Triad services, the RFP should define site-specific conditions and should reflect the

specific qualifications required to perform the project, including experience with the technologies of

interest, familiarity with the appropriate regulatory authority, past performance on similar projects,

capabilities in data management and analysis, and overall contract management and cost control

capabilities. Most RFPs request that bidders provide recent references for projects with similar scopes

and budgets.
U.S. Environmental Protection Agency
Office of Solid Waste and Emergency Response
Brownfields and Land Revitalization Technology Support Center    18

-------
          Understanding Procurement for Sampling and Analytical Services Under a Triad Approach

Types of Information Contained in theRFP

Components typically found in RFPs for Triad services are presented below.

Purpose:  Contains a concise statement of the work that the contractor is being asked to perform. An
example of a purpose statement for an RFP is as follows:

        The City of Pleasantville is soliciting proposals to select a qualified consulting firm to complete
        the base bid items described in the attached SOW within the scheduled time.  The contractor
        should also demonstrate the capability to perform the optional activities described in the  attached
        SOW within the scheduled time.

Background and Project Information:  Provides relevant site information that bidders can use  to
develop their technical approaches and cost estimates. The level of detail provided will vary by project;
however, for the Triad, it is important to provide detailed background information, including information
about uncertainties, the decisions to be supported by the work, and the quality requirements for the
decisions.

Statement of Work:  Provides a description of the work to be performed, including detailed information,
a schedule, and deliverables for each task. Sometimes this description will include activities related to the
quality required for environmental data.  The requirements in the SOW are used as the basis for
comparing the responsiveness and technical adequacy of the proposals received.

Cost Instructions:  Present information about how the proposed costs should be submitted.  For the
Triad, this presentation should include information about costing the base tasks and the optional tasks,
including  contingencies.  As discussed above, unit costs are especially useful for the Triad. Examples of
cost categories for Triad-based projects include equipment, consumables, and personnel costs. The level
of detail called for in the cost proposal will depend on a number of factors, including the complexity of
the  project and the specific  requirements of the procuring entity.

Evaluation Factors:  Include criteria that will be used to evaluate proposals.  Although the evaluation
factors should  be specific to the project and the procurement, the general types of factors presented below
often appear in Triad-related RFPs. These factors may be assigned a score (points for each category) or a
relative weight (based on which factors are more important).
U.S. Environmental Protection Agency
Office of Solid Waste and Emergency Response
Brownfields and Land Revitalization Technology Support Center     19

-------
          Understanding Procurement for Sampling and Analytical Services Under a Triad Approach
    •   Corporate experience - the contractor's experience related to the SOW as well as experience in
        using the Triad, applying innovative approaches and technologies, and performing similar
        projects. Recent experience (within the past 3 to 5 years) is generally requested along with
        references.  Other factors include the contractor's familiarity with applicable regulations and
        experience in working with stakeholders (decision-makers who will be involved with the site and
        in the Triad process).

    •   Qualifications of key personnel, including subcontractor staff- the qualifications of the
        contractor's and subcontractors' proposed key staff, such as the project manager, technical leads,
        and other technical personnel assigned to the project. The information submitted should include
        their titles, roles, responsibilities, and availability for the project as  well as information (for
        example, resumes) that demonstrates their experience and qualifications. For more complex
        projects, an organizational chart showing the responsibilities and lines of authority for the project
        personnel should be requested.

    •   Technical approach, including project plans - information used to  evaluate the contractor's
        understanding of the project, including a description of how the Triad approach will be
        implemented at the site.  In general, the information should include a description of the proposed
        methodology for each task as well as milestones and schedules for completing each task.

    •   Oral presentations - verbal presentations of a contractor's qualifications and other information
        related to the SOW. It is becoming more common to require contractors to make oral
        presentations in conjunction with submitting written proposals. For example, written proposals
        may be screened based on such key elements  as corporate or personnel experience.  Bidders that
        qualify would then make oral presentations to the selection officials. Oral presentations can
        provide a more interactive framework and can expedite the contractor selection process. Before
        the oral presentations are delivered, selection officials often prepare a list of questions to ask each
        contractor in order to ensure that contractors are consistently evaluated. The document
        "Assessing Contractor Capabilities for Streamlined Site  Investigations" (EPA 542-R-99-009)
        provides a series of potential questions for selection officials to ask when interviewing
        contractors about work related to  field-based technologies and streamlined approaches.  To help
        ensure that all bidders are treated equally during the procurement process, it is important that the
        questions to be asked during the oral presentations not be provided  by the procuring entity before
        the presentations and that, to the extent possible, the questions or categories of questions be
        standardized among contractors.  In the case of the federal government, there are stringent
        requirements for conducting and evaluating oral presentations, including guidelines for the format
        of the presentations. The specific procedures for oral presentations, including whether they  are
        included in the proposal  evaluation process, will vary by bid and by procuring entity.

    •   Cost proposal - the contractor's proposed costs, presented using the components and format
        required in the project-specific RFP.

    •   Insurance coverage - the information required to verify that the contractor has an adequate
        insurance program in place for successful performance of the project.


Terms and Conditions: Include the project-specific terms and  conditions that will apply to the

contractor. Examples of terms and conditions for Triad services include the following:
U.S. Environmental Protection Agency
Office of Solid Waste and Emergency Response
Brownfields and Land Revitalization Technology Support Center    20

-------
          Understanding Procurement for Sampling and Analytical Services Under a Triad Approach
    •   Conflict of interest - the RFP might specify that the contractor should not create any situation
        designed to influence project activities or decisions in ways that could lead to corporate or
        personal gain for the contractor or that could give an improper advantage to third parties in their
        dealings with the site owner or operator.

    •   Compliance with relevant laws and regulations - the RFP should clearly identify the laws and
        regulations that apply to the project.

    •   Termination of contract - the RFP should clearly identify conditions that will result in
        termination of the  contract.

    •   Validity of the costs in the proposal - the RFP should specify the time period for which the
        proposed costs are to remain valid from the date of proposal submittal.

Promoting the Use of Innovative Approaches and Technologies in the Procurement Process
Table 2-1 provides a list of questions that would help the buyer evaluate a bidder's experience and
qualifications regarding use of innovative sampling and analytical services and technologies.  Buyers that
include these types of questions in their RFPs will be better positioned to understand how a bidder may be
able to streamline its site investigation and cleanup process.


             Table 2-1. Examples of Questions to Include in an RFP for Triad Services
  •   What recommendations are being proposed to streamline the site investigation process?
  •   What approaches or strategies are being proposed to accelerate the schedule without sacrificing quality?
  •   What innovative technologies, instruments, and other equipment are being proposed to implement a
      streamlined site investigation?
  •   What projects has your firm successfully implemented that involved innovative approaches?
  •   How could field mobilizations be minimized while ensuring that adequate data are collected to define
      contamination and to support cleanup and redevelopment goals?
  •   What types of economy-of-scale strategies are being proposed?
  •   Under what circumstances would using a mobile laboratory be considered?
  •   What types of statistical methods or modeling programs are being proposed for sampling location selection
      or for CSM development?
  •   How will sampling, analytical, and risk-related uncertainties be managed?
  •   What techniques are being proposed to gain broad area information?
  •   What noninvasive techniques are being recommended to gain more information about the site?
  •   What relevant expertise does the proposed project team have?
  •   How will individual experts on the project team contribute to the decision-making process?
In addition, several states are looking at new ways to promote use of innovative approaches and
technologies at the local level.  For example, the States of Delaware and Ohio have purchased equipment
for providing field-based sampling and analytical services and have trained personnel who operate the
U.S. Environmental Protection Agency
Office of Solid Waste and Emergency Response
Brownfields and Land Revitalization Technology Support Center    21

-------
          Understanding Procurement for Sampling and Analytical Services Under a Triad Approach

equipment.  The box below provides further information about these efforts in Delaware, and additional
information about the State of Ohio's program is provided in Section 3.
  State of Delaware - Use of Trained Personnel and State-Owned Equipment
  The State of Delaware has procured field-based sampling and analytical equipment for conducting site
  characterizations. As part of the Superfund oversight program, PRPs may use the state's equipment and
  personnel to conduct field-based measurements using XRF, immunoassay (IA), or GC equipment and to provide
  field laboratory services on a daily rate.  In general, the analytical results provided by the state mobile laboratory
  are used to guide where samples should be collected for analysis by a fixed laboratory.  The state also uses
  contractors to supplement its technical staff. The state procures the services of contractors by requesting and
  evaluating a statement of qualifications followed by a cost proposal. Contractors bid on a hypothetical scope of
  work using agreed-upon unit rates. By offering innovative services in the form of field-based laboratory support
  to PRPs in the state Superfund program and VCP, the state promotes cooperation between stakeholders and the
  regulatory community. Under an EPA grant, the state has increased its capabilities to support investigations
  using field-based technologies. Further information about the State of Delaware's efforts is available at
  http://www.dnrec.state.de.us/dnrec2000/Divisions/AWMysirb/.  (Source: Personal communication with Qazi
  Salahuddin, DNREC, May 12, 2005).
2.3.3       Evaluating Proposals for Triad Services

Proposals are evaluated based on the specific evaluation criteria included in the RFP.  The following
discussion summarizes the types of evaluation criteria that are typically used in a procurement under a
Triad framework.

Technical Approach: The technical approach is evaluated to assess the reasonableness of the overall
approach proposed by the contractor to implement the project according to the requirements of the RFP.
Technical expertise will be needed to evaluate a proposal involving innovative technologies and the
Triad, including expertise in the proposed technologies, the proposed sampling and QA plans, and site-
specific conditions such as hydrogeologic conditions. Because innovative technologies are not as widely
used as more traditional approaches, a contractor that proposes use of innovative technologies should be
able to explain why its proposed approach is feasible and should specify the potential advantages for the
site. Similarly, the contractor should demonstrate a thorough knowledge of potential limitations
associated with the proposed technologies and should describe  contingency plans for adjusting the
approach as necessary. Such knowledge is crucial for presenting plans to regulators and for addressing
their concerns about potential limitations of proposed methods. For example, real-time measurement
technologies such  as the membrane interface probe (MIP) and LIF detectors can provide pinpoint
accuracy for designing an RA. However, these tools cannot currently provide the level of documentation
or the quantitative results used to support most risk assessments (see Attachment B, Overview of Field-
Based Measurement Technologies, for additional information about these technologies). The technical
U.S. Environmental Protection Agency
Office of Solid Waste and Emergency Response
Brownfields and Land Revitalization Technology Support Center     22

-------
          Understanding Procurement for Sampling and Analytical Services Under a Triad Approach

approach should include a description of the site-specific QA/QC procedures to be used, which are crucial
in applying innovative technologies.  Different instruments and site conditions will require different levels
and types  of QA/QC.  Some projects may require that the contractor demonstrate the applicability of the
proposed methods.  Other projects may require the contractor to use a QC program or a program that
adjusts the numbers and types of QC samples collected to match the identified data gaps. The technical
approach should identify specific tasks for developing a CSM.  The technical approach should also link
the identified sampling and analysis approach to the data required to support site-specific decisions.

Project Plans: Proposals that include use of a dynamic work strategy should describe the contractor's
proposed plan for ensuring effective communication and facilitating on-site decision-making among
stakeholders. The plan should describe (1) the  procedures for managing and interpreting field data (on a
daily basis or even more quickly); (2) stakeholder roles and responsibilities for making  decisions about
the need to obtain additional field data; and (3) communication of the decisions in a timely manner to the
site owner and to regulatory staff, if required. Software and data presentation formats should be included
and reviewed for completeness and clarity. Project plans should address the hydrogeologic conditions at
the site, borehole and  drilling methods, soil and water samples, and the capabilities and limitations of the
technologies to be used, including analytical issues.  Each technology has advantages and limitations that
need to be weighed against (1) the data required to support project decision-making and (2) potential
analytical  interferences in site-specific samples. Table 2-2  provides examples  of elements in a project
plan for using a Triad approach.

Personnel Experience: Various factors are crucially important when selecting personnel for projects
using the Triad approach.  These factors include the experience of each key staff member in using
innovative strategies under the site conditions presented in the RFP and the availability of personnel in
the full range of specialized technical disciplines needed to support use of appropriate technologies. The
contractor should have access to a multidisciplinary team that can address all aspects of the  project. In
general, teams should include staff with expertise in chemistry, geochemistry, geology, hydrogeology,
biology, toxicology, civil engineering, and soil sciences.  Depending on the site-specific conditions and
proposed options for remediation, other expertise may be required. For example, specialized expertise
may be required to conduct environmental and public health risk assessments,  operate models, or carry
out complicated statistical analyses.
U.S. Environmental Protection Agency
Office of Solid Waste and Emergency Response
Brownfields and Land Revitalization Technology Support Center    23

-------
          Understanding Procurement for Sampling and Analytical Services Under a Triad Approach
           Table 2-2.  Examples of Elements of a Project Plan for Using a Triad Approach
 Element: Hydrogeologic Conditions
 Relevance: The hydrogeologic conditions at a site control the migration of contaminants. Once the site geology
 has been defined, predictions of the direction of migration become more reliable. Higher detection rates can be
 achieved by selecting sampling locations where the pattern of migration indicates that contamination is present.
 Hydrologic information typically is obtained from regional maps of groundwater flow or from potentiometric
 surface maps.  Pore information obtained using cone penetrometer testing or Geoprobe technologies can be used
 to assemble detailed information about flow patterns at a particular site.	
 Examples of Information to be Included in the Project Plan:
  •   Data or other considerations that will influence the contractor's selection of borehole or sampling locations
      other than upgradient or downgradient locations
  •   Statistical methods or modeling programs the contractor will use to assist in selecting sampling locations
  •   Geophysical methods the contractor will use to gain a better understanding of the geology at the site
  •   Geophysical methods the contractor will use to evaluate the locations of subsurface utilities or underground
      structures
  •   Geologic information that will influence the contractor's selection of sampling locations
  •   The proposed method for evaluating detailed groundwater flow patterns at the site
  •   The proposed method of using the flow  pattern information in selecting sampling locations
  •   The contractor's capability to obtain information about patterns of groundwater flow by means other than
      use of published potentio metric  surface  maps	
 Element: Borehole and Drilling Methods
 Relevance: Soil depth profiles may be obtained quickly (within minutes to hours) with innovative direct-push
 techniques that provide geologic information continuously as the sensor penetrates the subsurface.  The sensor
 can be withdrawn while grouting material is exuded so that the borehole is sealed and no well remains to be
 maintained. The information obtained can be used to prepare a complete record of the site.
 Examples of Information to be Included in the Project Plan:
  •   Factors that influence the contractor's decision to use direct-push methods rather than standard drilling
      procedures
  •   The contractor's rationale for evaluation of the number of samples required
  •   Information about how subsurface soil depth profiles will be used in evaluating the soil samples that are to
      be collected
  •   The method to be used to collect soil samples for analysis
 Element: Soil and Water Samples
 Relevance: The results produced by field-based site characterization technologies range from qualitative
 (contaminant results provided in terms of presence or absence or as greater or less than some concentration level,
 such as "the concentration of polychlorinated biphenyls [PCB] in soil is greater than 1 milligram per kilogram
 [mg/kg]") to semiquantitative (contaminant results provided in terms of "mass of contaminant per mass of
 sample" in the form of wide concentration ranges, such as "the concentration of PCBs in soil is between 10 and
 50 mg/kg") to quantitative (contaminant results provided in terms of "mass of contaminant per mass of sample"
 as continuous data, such as "the concentration of PCBs in soil is 39 mg/kg"). Depending on the technology,
 reported values may be for single target analytes (such as trichloroethene [TCE]) or for a class of similar analytes
 that share some common property (such as chlorinated volatile organic compounds [VOC]).	
 Examples of Information to be Included in the Project Plan:
  •   Field analytical methods for identification of volatile contaminants such as benzene or TCE, certain
      semivolatile contaminants, or metals
  •   The factors that govern selection of field test kits for the project
  •   The method of evaluating the locations and number of samples
  •   When and how field methods, QA/QC procedures, and the sampling approach will be modified as more is
      learned about the site
  •   The strategy or justification for the mix of field analytical methods and laboratory analyses to be used
U.S. Environmental Protection Agency
Office of Solid Waste and Emergency Response
Brownfields and Land Revitalization Technology Support Center     24

-------
         Understanding Procurement for Sampling and Analytical Services Under a Triad Approach

Several factors affect the specific technical disciplines that are needed to support a project. The types of
contaminants and the instruments used at the site may require a chemist who has specialized experience in
analysis for the contaminants, or the physical characteristics of the site may require a geologist with an in-
depth understanding of local geology or hydrogeology. Similarly, QC protocols may need to be designed
by an analytical chemist who can assess whether the analytical methods will produce data of a quality
adequate to support the decisions to be made; the chemist should also have experience in using the
methods  in the field (as opposed to laboratory experience only).  Likewise, implementation of a
technology might require a data management specialist with an understanding of modeling software. In
addition, environmental scientists or engineers may need to be on site to interpret the data as they are
generated.

As an example, personnel who have the appropriate background in geochemistry can help predict the
mobility  of contaminants. If metals were released at a site, the mobility would depend on the speciation
of the metals, which in turn would depend on the reduction-oxidation (redox) potential at the site.  For
example, metals such as chromium (Cr, which is commonly used in industry) exist in various states;
however, Cr is most mobile in the Cr-VI state. Therefore, personnel with a background in redox
chemistry can help assess whether Cr will migrate to groundwater or be reduced to Cr-III, as is the case
where petroleum products are present, and can suggest when sample analysis for Cr-VI would be
warranted.  For many tasks, a Triad investigation will require senior experts to lead the decision-making
in the field  and to communicate findings to those team members who are not in the field.

Corporate Experience: Depending on the specifications for the  project, contractors should demonstrate
their experience in  selecting and using specialized field equipment, designing remediation plans,
remediating sites in similar  settings, proactively identifying problems that might affect the project, and
determining how to resolve  them.  The use of dynamic work strategies includes an element of uncertainty.
The selected contractor may encounter problems that require creative thinking, use of uncertainty
management tools, and special expertise to resolve the problems and keep the project moving forward.
Contractors that can demonstrate prior corporate experience in working under dynamic conditions would
be better suited to perform such a project.

Quality Assurance and Quality Control Procedures: The selected contractor should understand the
importance of following sound QA/QC procedures in completing the work. In general terms, QA is an
integrated system of management activities carried out to ensure that the work performed and the
products  provided are of the type and quality needed and expected. QC is the system of technical
U.S. Environmental Protection Agency
Office of Solid  Waste and Emergency Response
Brownfields and Land Revitalization Technology Support Center    25

-------
         Understanding Procurement for Sampling and Analytical Services Under a Triad Approach

activities performed to measure and control quality in order to ensure that data meet the needs of users.
Prescriptive, "one size fits all" QC programs generally are not adequate when field-based technologies are
applied.  QC programs should be adaptable and flexible so that supplementary review procedures can be
added in response to unforeseen conditions. Errors can occur in the field or laboratory in characterizing
and monitoring sites; therefore, QA/QC procedures should be built into all key activities. Contractors
need to be prepared to implement QA/QC procedures for all aspects of a project, including planning,
sample collection, laboratory analysis, data review, and data assessment. Additional types and quantities
of QC samples will likely be required as more is learned about a site.  The adequacy of QA/QC reviews
and check samples may also be determined in part by the needs  of the regulatory authority and the need to
make defensible decisions.

The project-specific QA/QC procedures should ensure that federal, state, and local QA/QC requirements
are met.  Depending on the site-specific situation, the types of decisions to be made about the site, and the
entity that will make those decisions, it may be necessary that data be defensible on a regulatory basis, a
scientific basis, or both.  In addition, when using the  Triad approach, contractors should understand how
site-specific and technology-specific QA/QC programs are developed and modified as a project
progresses to ensure the accuracy, precision, comparability, and completeness of the  data generated.

Furthermore, provisions should be made to audit data throughout the project rather than at the end, after
all the analyses have been completed.  By auditing data throughout the project, potential site-specific
problems with an analytical method can be quickly identified and addressed, thus avoiding the need to
reanalyze samples.

Streamlined investigation and monitoring strategies rely heavily on comprehensive, up-front planning for
collection of data that will support the  decisions to be made about the site as well as data needed to
support defensible decisions, including QC data.  The planning process includes the development of the
CSM and the systematic plan.  Contractors need to demonstrate relevant experience in the planning
process, and they need to explain how  they will maintain and use QC data as they implement the site
assessment work plan. Because site characteristics, decisions to be made, and data quality needs vary
from site to site, the contractors' QA/QC qualifications should be evaluated based on the site-specific
requirements covered in the RFP (see box below for  further information about the capabilities and
limitations of field-based technologies).
U.S. Environmental Protection Agency
Office of Solid Waste and Emergency Response
Brownfields and Land Revitalization Technology Support Center     26

-------
          Understanding Procurement for Sampling and Analytical Services Under a Triad Approach
  Understanding Capabilities and Limitations of Field-Based Site Characterization Technologies
  Field-based site characterization technologies produce data that can target the principal sources of uncertainty at
  a site.  The type of data generated by a field-based technology depends on the degree of sophistication of the
  technology and the QA/QC measures implemented while using the technology. An understanding of the analyte
  or analytes (specific chemicals or contaminants) targeted by the technology and the principles and analytical
  interferences related to use of the technology is essential to selecting and implementing the correct technology
  for a site.  For example, IA test kits designed for PCB analysis usually are calibrated with a specific Aroclor (the
  trade name for PCB mixtures), but the kits will respond with varying degrees of sensitivity to other PCB
  mixtures.  Cross-reactivity in test kits can be an advantage. When broad screening for the presence or absence of
  a group of contaminants is desired, it can be accomplished with a high sampling density, cost-effectively
  managing the principal source of uncertainty (sampling) that controls the reliability of most site decisions. In
  this example, the contractor can use QA/QC information to demonstrate that data are of known and documented
  quality.
Contractor Insurance:  There is potential risk at any contaminated site. A site investigation and
remediation project could disturb contaminants and cause pollution damage.  Several types of insurance
coverage and products are available and appropriate for protection against potential damages and
liabilities associated with characterization and remediation of contaminated sites. Some coverage may be
standard requirements in any contract issued by a Brownfields community, private company, or other
entity. Other specialized coverage may be required for a site or project. Typically, entities that issue
contracts take prime responsibility for identifying insurance needs for a project because they could be
ultimately responsible for damages from both the environmental and business viewpoints. For
Brownfields sites, banks and other lending institutions will specify the insurance coverage that should be
in place to protect the loans.  Before any contract is signed, it is important that all parties understand the
potential risks and be assured that all appropriate insurance coverage is in place.

Table 2-3 lists information about four types of environmental insurance products that generally are
considered for site investigation and cleanup contractors.  The types of insurance necessary and the limits
of coverage vary from site to site.  Factors such as the potential types of contaminants present, the
proximity to groundwater, the degree to which the site has been properly characterized, and the proximity
to active businesses and population centers should be considered in evaluating the types and levels of
insurance necessary.  Questions about the availability and selection of insurance products for a specific
site should be directed to insurance companies and underwriters that specialize in environmental
insurance.  The insurance company should provide a certificate of insurance to the procuring entity on
behalf of the contractor.  Further information about environmental insurance policies for Brownfields
sites is available at www.epa.gov/brownfields/insurebf.htm.
U.S. Environmental Protection Agency
Office of Solid Waste and Emergency Response
Brownfields and Land Revitalization Technology Support Center    27

-------
         Understanding Procurement for Sampling and Analytical Services Under a Triad Approach
                  Table 2-3. Insurance Coverage Considerations for Contractors
Type of Coverage
Pollution Liability
Cost Cap
Secured Lender
Finite Risk
Key Features of Coverage
Covers third-party claims for bodily injury, property damage, and cleanup costs both off
site and on site. Also covers newly discovered contaminants, natural resource damage
claims, diminution of property values, business interruption due to contamination,
regulatory re-openers, waste transportation, and project delays.
Covers cost overruns for remediation expenses, changes in regulatory standards and
laws, and costs associated with newly discovered contaminants or additional known
pollutants. Based on cost estimates for completing an approved RA plan. Often requires
a self-insured retention threshold that the insured must pay before coverage is applied.
Pays for a covered loan upon loan default where pollution conditions exist. Policies can
pay for loan balances, cleanup costs, legal defense, contract damages, bodily injury,
property damage, and business interruption.
Transfers financial liabilities from the insured to an insurance carrier. Insured pays the
insurer the entire present value of the projected cleanup cost when the insurance is
obtained. Insurance carrier takes on the financial responsibilities for the cleanup.
Environmental insurance issues should be considered during the procurement and planning process.
Collection of data that are required to meet insurance policy requirements or that may affect insurance
costs should be incorporated into the technical approach. By reducing areas of uncertainty for a site, the
Triad can provide insurers with better information about the site, thus providing an opportunity to
decrease insurance costs or attachment points.

Cost Proposal: The cost proposal for a project involving innovative technologies should follow the
requirements specified in the RFP and is usually evaluated on the basis of overall cost or overall value.
Unit pricing is generally used for potentially high-volume or unpredictable components of a project, such
as clearing, backfilling, installation of wells, and treatment of contaminated media.  Prices proposed as a
lump sum or as fixed-unit prices can be evaluated based on the criteria identified in the RFP and by
comparing the prices submitted by competing bidders.

2.3.4       Awarding a New Contract

Based on the results of the proposal evaluation, a contractor is awarded a contract by the procuring entity.
The basis for the award is tied to the evaluation criteria, and the procuring entity notifies the winner as
well as the contractors that were not awarded the contract. The exact requirements for notification vary
among procuring entities.
U.S. Environmental Protection Agency
Office of Solid Waste and Emergency Response
Brownfields and Land Revitalization Technology Support Center    28

-------
         Understanding Procurement for Sampling and Analytical Services Under a Triad Approach

2.4    PROCURING TRIAD SERVICES USING AN EXISTING CONTRACT

When an existing contract is used, the specific contract type, requirements, and procuring entity will
dictate the process for how the procurement is accomplished.  The following sections provide a general
overview of how Triad services have been procured under existing contract vehicles. It is important to
note that this discussion does not reflect any one contract mechanism or procurement entity. Rather, it
illustrates some of the general aspects of procurement under a Triad approach for federal and nonfederal
projects.

2.4.1       Preparing a Statement of Work

When using an existing contract, the buyer prepares a description of the project scope and requirements
that, depending on the contract, may be referred to by a number of terms, including SOW, task order, and
delivery order.  For this discussion, the project description is referred to as the SOW. The SOW is issued
to the contractor, and the contractor prepares and submits a work plan and cost estimate in response. For
Triad projects, it is important that the SOW and proposed work plan include the Triad-specific
considerations described above,  such as developing a systematic plan, using a dynamic work strategy, and
using real-time measurement technologies, as well as all site- and project-specific requirements and all
site- and decision-specific QA/QC requirements.

When preparing a SOW under the Triad, the buyer must present a sufficient breadth of activities to allow
the contractor to properly implement the project. The SOW should clearly identify which tasks are
considered necessary and which tasks are considered optional.  The SOW should include:

    •   Development of a systematic project plan, including development and revision of the CSM
    •   Use of a dynamic work strategy
    •   Use of real-time measurement technologies, including field-based innovative technologies as
       appropriate, and application of QA/QC requirements to ensure that the data generated are of the
       quality needed to support decisions

One approach to developing a SOW under the Triad is to organize the SOW in separate sections that
include a clear description of project requirements, a description of the work that is included in the base
bid, and a description of the optional work that may be needed during the project. It is helpful to define
the options as units, to clearly define each unit in terms of logically related tasks, and to require the
contractor to link each unit to the decision that it will support.
U.S. Environmental Protection Agency
Office of Solid Waste and Emergency Response
Brownfields and Land Revitalization Technology Support Center    29

-------
          Understanding Procurement for Sampling and Analytical Services Under a Triad Approach

Under the Triad, the performance objectives should be well defined without impacting flexibility or being
overly prescriptive.  That is, the buyer should define performance objectives (what is to be accomplished)
but should give the contractor the flexibility to decide how to achieve the intended results in a manner that
will potentially reduce costs and provide the best value (how it will be accomplished). Available
illustrations, maps, diagrams, and tables should be included in the SOW to further describe the work or
the related requirements. When a buyer is not technical, it is helpful to have others who are familiar with
the site and the technical project requirements, such as technical experts and the project manager, be
involved in developing the SOW.

In some cases, it may be advantageous to use government-wide agency contracts or multiple award
schedules to procure services. The text box below provides additional information about these types of
contract mechanisms.
  Government-Wide Agency Contracts and Multiple Award Schedules
  Recently, federal agencies have been using several types of government-wide agency contracts, including
  General Sen-ices Administration (GSA) multiple award schedules, to procure services. Under the GSA
  Schedules Program, GSA establishes long-term, government-wide contracts to provide access to over 6.8 million
  commercial supplies and sendees that can be ordered directly from GSA Schedule contractors.  For example,
  under GSA's Environmental Sendees Schedule 899, federal agencies can obtain sendees under various Special
  Hem Numbers, including Environmental Planning Services & Documentation Services (899-1), which
  includes environmental assessments and other environmentally related studies and consultations, and
  Remediation Services (899-8), which includes excavation, removal, transportation, storage, treatment, and
  disposal of hazardous waste; preparation,  characterization, field investigation, conservation, and closure of sites;
  wetland restoration; emergency response; underground storage tank and aboveground storage tank removal;  air
  monitoring; soil vapor extraction, stabilization/solidification, bioventing, carbon absorption, reactive walls,
  containment, monitoring, and waste reduction at hazardous waste sites; and ordnance removal and support.
  Further information on such services is available at
  http://www.gsa. gov/Portal/gsa/ep/cliannelView.do?pageTvpeId=8211&cliannelPage=/ep/channel/gsaCh-erview.j
  sp&channelld=-12989.
2.4.2       Evaluating the Work Plan and Cost Estimate

The work plan and cost estimate submitted by the contractor in response to the SOW are evaluated by the
buyer based on the specific requirements of the SOW. Under a Triad framework, it is important to place
special emphasis on the Triad-specific considerations of the SOW.  The evaluation of a work plan and
cost estimate under an existing contract will follow steps similar to those detailed above for new
contracts.
U.S. Environmental Protection Agency
Office of Solid Waste and Emergency Response
Brownfields and Land Revitalization Technology Support Center    30

-------
          Understanding Procurement for Sampling and Analytical Services Under a Triad Approach

2.4.3       Approving the Work Under an Existing  Contract

Based on the results of the work plan and cost estimate evaluation, the work is approved by the
contracting authority, and the contractor is notified that work can proceed.  The exact requirements for
formal approval and issuing a notification to proceed are dictated by the terms and conditions of the
existing contract.
U.S. Environmental Protection Agency
Office of Solid Waste and Emergency Response
Brownfields and Land Revitalization Technology Support Center     31

-------
          Understanding Procurement for Sampling and Analytical Services Under a Triad Approach


              3.0    EXAMPLES OF RECENT PROCUREMENT EXPERIENCES


This section presents six case study examples of specific sites and programs for which site investigation
and cleanup services have been procured under a Triad framework.  As shown in Table 3-1, these
examples include federal, state, local, and private sector projects; cover a variety of contaminants, media,
and site types; and include use of various real-time measurement technologies.  The examples offer
insights into the following types of activities related to federal and nonfederal procurement strategies:


    •   Using fixed-unit costs
    •   Performing systematic planning separately from field activities
    •   Prequalifying technology and service providers
    •   Demonstrating flexibility in providing services to support a dynamic investigation
    •   Establishing personnel qualifications
    •   Using in-house capabilities for site investigation
    •   Employing area-wide approaches to  site investigation

The attachments cited in this section are available on related Web sites, as discussed in Table 1-1 and
shown at the end of this report.
      Table 3-1.  Summary of Recent Procurement Experiences - Selected Sites and Programs
Site/Program
Name,
Location,
Organization
Conducting
Procurement
McCormick and
Baxter
Superfund Site,
Stockton, CA

USAGE Field
Work

(Section 3.1.1)






Contaminants;
Media; Site
Type
DNAPLs
(creosote and
PCP);
Soil and
Groundwater;
Wood
Treatment
Facility







Real-Time
Measurement
Technologies
Sonic drilling
(to a depth of
250 feet bgs)













Procurement
Information
Services were procured
using fixed-unit costs and
performance of systematic
planning separate from
field activities; services
involved advancing a
baseline set of two
boreholes and four
progressively more
complex options for
boreholes and monitoring
wells.





Comments
The investigation was
geared toward potential
use of in situ thermal
treatment technologies for
cleanup.







U.S. Environmental Protection Agency
Office of Solid Waste and Emergency Response
Brownfields and Land Revitalization Technology Support Center
32

-------
          Understanding Procurement for Sampling and Analytical Services Under a Triad Approach
      Table 3-1. Summary of Recent Procurement Experiences - Selected Sites and Programs
                                             (continued)
Site/Program
Name,
Location,
Organization
Conducting
Procurement
Wenatchee Tree
Fruit Research
and Extension
Center,
Wenatchee, WA

USACE Field
Work
(Section 3.1.2)
Florida
Department of
Environmental
Protection
(FDEP), Dry
Cleaning
Solvent Cleanup
Program, FL

State Lead -
Florida
(Section 3.2.1)
Former Starkey
Junkyard Site,
Uhrichsville,
OH

State Lead -
Ohio

(Section 3.2.2)




Contaminants;
Media; Site
Type
Pesticides
(organochlorine
and organo-
phosphorus);
Soil; Research
Facility



Chlorinated
Solvents; Soil
and
Groundwater;
Dry Cleaners







VOCs, SVOCs,
TPH, PCBs, and
Metals; Soil and
Sediment; Auto
Salvage Yard








Real-Time
Measurement
Technologies
IA test kits








Various,
including direct-
push sampling,
field GC, and
colorimetric test
kits






Direct-push
sampling
(Geoprobe),
mobile
laboratory (field
GC, XRF, IA
test kits, and
HazCat kits),
and sediment
sampling




Procurement
Information
USACE used a two-step
process of first
undertaking systematic
planning and then using a
BOA with a small
business to obtain IA test
services.


FDEP developed a short
list of qualified
contractors (partially
based on oral
presentations); as of
August 2002, FDEP had
identified 1 1 firms for
contract award. Awards
are made based on this
short list of qualified
contractors.

Systematic planning was
performed separately
from procurement of
sampling and analytical
services; Ohio EPA
provided field sampling
and analysis capabilities.








Comments
Use of a dynamic
approach based on the
systematic plan was
shown to save about 50
percent of the cost for
performing site
assessment and cleanup.


Results for one site
showed increased
certainty in targeting hot
spots, less use of off-site
sampling (only in source
areas), and increased
sampling density and site
coverage.




Ohio EPA, through its
SIFU, provides field
equipment and trained
personnel to communities
for use in obtaining real-
time results, supporting
targeted sampling, and
delineating hot spots or
areas of concern.

U.S. Environmental Protection Agency
Office of Solid Waste and Emergency Response
Brownfields and Land Revitalization Technology Support Center
33

-------
          Understanding Procurement for Sampling and Analytical Services Under a Triad Approach
      Table 3-1.  Summary of Recent Procurement Experiences - Selected Sites and Programs
                                           (continued)
Site/Program
Name,
Location,
Organization
Conducting
Procurement
Assunpink
Creek
Greenway
Project,
Trenton, NJ

City of Trenton
Brownfields
Assessment
Grant
(Section 3.3.1)
Lake Success
Business Park
(DuPont), CT

Private -
DuPont
(Section 3.4.1)



Contaminants;
Media; Site
Type
PAHs, PCBs,
TPH, and Heavy
Metals; Soil and
Groundwater;
Wire
Manufacturer
and Rail Yard




Heavy Metals
(lead); Soil;
Small Arms
Manufacturing
and Storage





Real-Time
Measurement
Technologies
Direct-push
sampling, IA
test kits, XRF,
and field
GC/MS






XRF










Procurement
Information
Services were procured
through an open RFP.
Required activities
included preparation of a
dynamic work plan that
identified decision rules
and the technical
approach.



Services were procured
under an existing contract
with a full-service firm.









Comments
The City of Trenton used
an area-wide approach to
investigate several parcels
bordering the creek. The
site is to be redeveloped
as a recreational area and
greenway.




A cost evaluation showed
savings because XRF was
used instead of
conventional analysis at
an off-site laboratory.


Notes:

bgs      Below ground surface
DNAPL  Dense nonaqueous-phase liquid
GC/MS   Gas chromatography/mass spectrometry
HazCat   Hazard categorization
PAH     Fob/cyclic aromatic hydrocarbon
PCP     Pentachlorophenol
SVOC    Semivolatile organic compound
TPH     Total petroleum hydrocarbons
3.1
FEDERAL CASE STUDIES
This section presents case studies for projects in California and Washington that involved USAGE. These

projects incorporated (1) fixed-unit costs, and (2) a procurement in which systematic planning was to be

conducted separately from field activities.  One example involved site characterization, and the other

involved a removal action.
U.S. Environmental Protection Agency
Office of Solid Waste and Emergency Response
Brownfields and Land Revitalization Technology Support Center
                                        34

-------
         Understanding Procurement for Sampling and Analytical Services Under a Triad Approach
3.1.1       Sonic Drilling Services for the McCormick and Baxter Superfund Site DNAPL
           Investigation
3.1.1.a         Background

The McCormick and Baxter (M&B) wood preserving company operated on a 29-acre site in Stockton,
California, from 1942 until 1990. M&B chemically treated wood products in pressure cylinders with
various preservation solutions containing creosote, PCP, arsenic, copper, chromium, and zinc. Solvents
or carriers for these preservatives reportedly included petroleum-based fuels such as fuel oil, kerosene,
diesel, butane, and ether. The chemicals of concern (COC) identified for the M&B site are PCP, PAHs,
arsenic, and dioxins and furans.  PCP and PAHs were potentially present as DNAPL. The subsurface
strata most likely to be encountered at the site are alluvial fan and fluvial deposits, including silt, silty
clay, clayey silt, silty sand, sand, and coarse-grained sands and gravels. The objectives of the DNAPL
investigation were to identify the nature and extent  of the DNAPL contamination and to define geologic
conditions that would affect the implementability of in situ thermal treatment technologies.  The site was
added to the Superfund National Priorities List in October 1992.  EPA was the lead agency for the fund-
lead cleanup, and  USAGE was responsible for conducting the site characterization.

Sonic drilling, as discussed below, was conducted from July - August 2000. Six borings were completed
and two wells were installed.

3.1.l.b         Procurement Information - McCormick and Baxter Superfund Site

USAGE developed a SOW to obtain sonic drilling services  for investigating DNAPLs at the site, as
shown in Attachment E. The SOW requested that a contractor furnish services, materials, equipment,
supplies,  and personnel necessary to advance two or more primary sonic drilling borings at the site.  In
addition,  the SOW provided USAGE with the flexibility to order one to four additional  services  (options)
based on  the findings during the DNAPL investigation. USAGE required that bidders estimate costs for
the primary borings and the four options based on unit costs for specific services. The primary borings
consisted of a minimum of two borings drilled and continuously cored from the ground surface to an
approximate depth of 250 feet bgs. The borings were to be  continuously logged and sampled, and up to
two 4-inch-diameter monitoring wells were to be installed.  Unit costs for these activities were based on
the:
U.S. Environmental Protection Agency
Office of Solid Waste and Emergency Response
Brownfields and Land Revitalization Technology Support Center    35

-------
         Understanding Procurement for Sampling and Analytical Services Under a Triad Approach

    •  Number of hours for drill rig rental
    •  Number of feet of borehole advancement and abandonment
    •  Number of hours for well development

Options were provided for additional borings to be advanced on site and in a nearby slough, and one
option involved renting a barge for the work in the slough. The unit costs for these activities had a
structure similar to that of the unit costs for the primary borings. The SOW language describing
provision of the optional services and cost estimates is included in Attachment E.

The SOW also established requirements for the personnel who would provide the drilling services and the
equipment to  be used.  For example, the selected contractor was to provide at least one experienced
operator and two helpers.  The operator needed to have a minimum of 5 years of experience operating the
equipment provided, including a rotary-sonic drill rig. A second helper was required because of the
potential for off-site drilling and  implementation of dust control measures. The equipment was to include
the rotary-sonic drill rig, two water tanks, and a water truck as well as the rental barge and all other
necessary equipment if the associated option was authorized. Attachment B provides additional
information about field-based measurement technologies.

By segmenting the work into discrete tasks or options, USAGE could manage project contingencies
within the overall SOW. This approach also helped to minimize the number of mobilizations to the site.

Points of Contact:
Meegan Nagy
USAGE
Telephone: (916) 557-7257
E-mail:  meegan.g.nagy@usace.army.mil
Marie Lacey
EPA Site Manager
EPA Region 9
Telephone: (415)972-3163
E-mail:  lacey.marie@epa.gov

Sources of Additional Information:
USAGE. "McCormick and Baxter Superfund Site - Sonic Drilling Scope of Work." CESPK-ED-E-8.
March 2000.
U.S. Environmental Protection Agency
Office of Solid Waste and Emergency Response
Brownfields and Land Revitalization Technology Support Center    36

-------
         Understanding Procurement for Sampling and Analytical Services Under a Triad Approach
3.1.2       Immunoassay Testing for Pesticides at the Wenatchee Tree Fruit Research and
           Extension Center Site
3.1.2.a         Background

The Wenatchee Tree Fruit Research and Extension Center (WTFREC) site is an agricultural research
center in Wenatchee, Washington. A portion of the site was used as a pesticide disposal research area
from 1966 until the early 1980s, resulting in soil contaminated with organochlorine, organophosphorus,
and other pesticides. USAGE, in cooperation with EPA and the site owner, wished to clean up the site for
residential reuse. Attachment F provides further information about this site, including case studies about
the site investigation and cleanup process, the RAMP, and the FSP. The cleanup was performed under
the regulatory oversight of the State of Washington Department of Ecology VCP, and USAGE led the site
investigation, including procurement of investigation services.

The goal for the cleanup project was to identify, characterize, remove, and dispose of all pesticide-
contaminated soil and debris present in the test plot area of the WTFREC. The action levels were
determined to be the State of Washington Model Toxics Control Act (MTCA)  Method B Cleanup Levels.
USAGE used a systematic plan with a dynamic work strategy guided by field analysis to integrate the site
characterization and cleanup processes.  Soil was characterized, excavated, and segregated based on IA
test kit results for dichlorodiphenyldichloroethane (DDT) and cyclodiene pesticides such as dieldrin and
endrin. For the project, USAGE developed a detailed SOW that outlined the on-site decision-making plan
and specified the on-site measurement technologies to be used.  In addition, a decision flow diagram was
developed to guide the contractor through the on-site decision-making process.

The USAGE team developed site-specific action levels for the IA test kits based on a comparison with
analytical results from a fixed laboratory. An initial demonstration of method applicability involving the
IA method results and fixed laboratory results was completed before the SOW was finalized, and the
demonstrate results were incorporated into the systematic plan.  The IA data were used to  identify areas to
be excavated and to confirm that contaminated soil had been  removed. The project was completed in
accordance with MTCA Method B Cleanup  Levels.
U.S. Environmental Protection Agency
Office of Solid Waste and Emergency Response
Brownfields and Land Revitalization Technology Support Center    37

-------
         Understanding Procurement for Sampling and Analytical Services Under a Triad Approach
3.1.2.b         Procurement Information - Wenatchee Tree Fruit Research and Extension Center
               Site
USAGE procured a prime contractor for the project (Garry Struthers Associates, Inc.) using a preplaced,

indefinite-quantity, delivery order contract in August 1997. The contract was awarded based on

evaluation of competitive bids from prospective contractors. The work was done under delivery orders

that used a combination of fixed-price and fixed-unit price payment schedules.  The prime contractor

prepared the RAMP and oversaw several subcontractors, including one subcontractor for transport and

disposal of contaminated soil, one for soil sampling, and three for analytical work.


Characterization, cleanup, and closure were accomplished in a single 4-month field mobilization
(September 1997 to January 1998).  The project cost of $589,000 was about half the $1.2 million

estimated for a more traditional site characterization and remediation scenario.  That scenario would have

required multiple rounds of field mobilization, sampling, sample shipment, laboratory analysis, and data

assessment.  The dynamic approach resulted in substantial savings in the areas of soil analysis and waste

transport and disposal.


Points of Contact:

USACE - Seattle District
Greg Gervais
QA Representative
Telephone: (206) 764-6837

Ralph Totorica
Project Manager
Telephone: (206) 764-6837

Kira Lynch
Project Environmental Scientist/Chemist
Telephone: (206)764-6918
E-mail: Kira.P.Lynchrg!NWS()2.usace.army.mil

Gary Struthers Associates, Inc.
Mike Webb
Technology Demonstrator
Telephone: (425) 519-0300 (extension 217)

EPA Office of Research and Development
Howard Wilson
Telephone: (202) 564-1646
E-mail: wilson.howard@epa.gov
U.S. Environmental Protection Agency
Office of Solid Waste and Emergency Response
Brownfields and Land Revitalization Technology Support Center    38

-------
         Understanding Procurement for Sampling and Analytical Services Under a Triad Approach

Washington State Department of Ecology
Thomas L. Mackie
Central Regional Office
Telephone: (509) 454-7834

Sources of Additional Information:
EPA. "Innovations in Site Characterization Case Study:  Site Cleanup of the Wenatchee Tree Fruit Test
Plot Site Using a Dynamic Work Plan."  EPA-542-R-00-009. August 2000.
USAGE. "Remedial Action Management Plan - Wenatchee Tree Fruit Research Center Test Plot
Remediation." August 1997.
USAGE. "Sampling and Analysis Plan,  Field Sampling Plan - Part B." No Date.
USAGE. "Quality Assurance Project Plan, Sampling and Analysis Plan - Part C." No Date.
USAGE. "Cost and Performance Report - Expedited Characterization and Soil Remediation at the Test
Plot Area, Wenatchee Tree Fruit Research Center." May 15, 2000.

3.2    STATE CASE STUDIES

This section presents two case studies, one for the State of Florida involving use of a preapproved set of
contractors and one for the State of Ohio involving state ownership and operation of field investigation
equipment.

3.2.1      Use of Short-Listed Contractors in State of Florida Dry Cleaner Remediation Program

3.2.1.a         Background

In 1994, the Florida legislature created a program to address remediation of sites and drinking water
supplies contaminated with dry cleaning solvents. The Dry Cleaner Remediation Program (sometimes
referred to as the Solvent Cleanup Program) has been used by active and inactive dry cleaning facilities,
dry cleaning wholesale supply facilities,  and coin-operated dry cleaning facilities, with more than 1,400
sites made eligible for cleanup. The program includes  a tax levied on dry  cleaning services to accumulate
the funds necessary to clean up spills at dry cleaner facilities with the potential to impair the quality of
groundwater in Florida. The program provides characterization and remediation services and limited
liability protection to dry cleaner owners and operators. The program operates on a budget of
approximately $7.5 million per year.  Program applicants are responsible for paying a project deductible
that can range from $1,000 to $10,000 based on the date of application.
U.S. Environmental Protection Agency
Office of Solid Waste and Emergency Response
Brownfields and Land Revitalization Technology Support Center   39

-------
          Understanding Procurement for Sampling and Analytical Services Under a Triad Approach

Private contractors perform the remediation and are managed by FDEP contract managers. FDEP assigns
sites to contractors for assessment and cleanup based on the results of a ranking. Assignments are based
in part on geographic areas to streamline equipment use and mobilization efforts. Florida provides
cleanup procedures and guidelines for sites contaminated with dry cleaning solvents, including target
cleanup levels for ground-water, surface water, and soil as well as natural attenuation default
concentrations for groundwater. Goals for the site assessments are to minimize the number of site
mobilizations, use existing data, minimize investigation-derived waste, and streamline reporting
requirements.  The program methodology relies on direct-push sampling and on-site mobile laboratories,
microwells for monitoring groundwater quality, the ability to change the scope of an assessment while
field work is ongoing, and collection of data needed for the RD during the site assessment.

3.2.1.b         Procurement Information - State of Florida Dry Cleaner Remediation Program

Under the FDEP program (associated documentation is provided in Attachment G), FDEP "short lists"
contractors based on statement of qualifications (SOQ) packages and then issues BOAs to a select group
of contractors that will potentially perform site work.  Based on contractor location and degree of use
under the contract, FDEP assigns sites to one or more contractors.  Projects are not competitively bid;
only subcontracted activities whose costs can vary widely based on site conditions, such as drilling
services, are bid out. Contractors' standard rates are determined in their contracts with FDEP. The
assigned contractor conducts an initial site visit that results  in a preliminary evaluation of the  site. Based
on this evaluation, the contractor develops a detailed SOW  and cost estimate.  The contractor and FDEP
then procure subcontractor quotes based on the anticipated  scope of activities not specifically called out
as unit costs in the basic contract.

The SOW for an FDEP project typically includes field preparation, mobilization and demobilization, well
sampling, data evaluation, report preparation, remedial alternative evaluation, and management of
investigation-derived waste. Based on the conditions encountered at a site, the scope of the field work
may be expanded or reduced using the unit rates.  Scope changes may be approved through Field Work
Change Directives that allow approval of cost increases without project delays.  Use of the established
unit rates allows FDEP to avoid stopping work in progress in order to process change orders.  FDEP
formalizes approved Field Work Change Directives in contract change orders that are processed after
field activities are completed.
U.S. Environmental Protection Agency
Office of Solid Waste and Emergency Response
Brownfields and Land Revitalization Technology Support Center     40

-------
         Understanding Procurement for Sampling and Analytical Services Under a Triad Approach

FDEP approves contractors by reviewing SOQ packages and conducting interviews.  Oral interview
questions cover topics such as site assessment and remedy selection, construction and operation of active
treatment systems, pay-for-performance, monitored natural attenuation, process and project management,
and knowledge of state rules and regulations.  In August 2002, FDEP identified 11 firms for contract
award, including many of the larger environmental consulting firms operating in Florida.

FDEP maintains program consistency and project compliance with a systematic plan by:

    •  Providing its contractors with a well-structured set of guidelines and preprinted forms used to
       compile site information
    •  Assigning a central point of contact during the investigation, remediation, and review process

For investigation work, FDEP has a single state-certified hydrogeologist who reviews each work plan.  A
certified professional engineer reviews each RD before it is implemented; most designs developed under
the program involve presumptive remedies or remedies proven to be effective under similar site
conditions. The FDEP program may have up to 10 projects underway at any one time.

Because FDEP has worked with the same contractors over the last 3 years, the department has been able
to develop a detailed unit cost structure that allows for flexibility while controlling costs.  FDEP develops
unit rates that can be combined into tasks and  subtasks whose total costs can then be estimated on a fixed-
price basis. As shown in Attachment G, labor rates are provided for more than 25 categories of labor and
laboratory analyses for multiple types of analytes. The analytes (and analytical methods) include metals
(inductively coupled plasma [ICP], flame atomic  absorption [AA], furnace AA, gaseous hydride, and cold
vapor), purgeables (GC and GC/MS), extractables, and leach testing parameters.  Mobile laboratory rates
are provided based on a minimum of 10 samples per day for a single GC and a chemist. Additional rates
are available for equipment used for air sampling and monitoring, groundwater and surface water
sampling, soil and sediment sampling, surface geophysical testing, and other activities; vehicle rental; and
personal protective equipment.

3.2.1.c         Specific Example Site - State of Florida Dry Cleaner Remediation Program

The Concord Custom Cleaners  site in Tallahassee, Florida, is an inactive dry cleaner facility that operated
from 1970 until 2001. Under a BOA with FDEP, LFR Levine-Fricke Inc. performed an initial site visit in
September 2001.  The contractor developed a plan that included use of direct-push equipment and an on-
site mobile laboratory, as shown in Attachment G. The contractor then installed six small-diameter
U.S. Environmental Protection Agency
Office of Solid Waste and Emergency Response
Brownfields and Land Revitalization Technology Support Center    41

-------
         Understanding Procurement for Sampling and Analytical Services Under a Triad Approach

monitoring wells at the site using direct-push methods.  A fixed laboratory analyzed groundwater
collected from the monitoring wells.

3.2.1.d         Specific Example Site - State of Florida Remediation

For the Galloway Drum Recycling (CDR) site in Auburndale, Florida, Ecology and Environment, Inc.,
developed a dynamic work strategy that included use of direct-push technology and the Color-Tec
analytical method (a semiquantitative method that measures total chlorinated compounds). The
contractor conducted the site assessment project in support of FDEP under a cooperative agreement with
EPA Region 4. The CDR site was used as a drum recycling facility in the 1970s, and its soil and
groundwater were suspected to be contaminated with petroleum hydrocarbons and chlorinated solvents,
as shown in Attachment G.  Although this site was not assessed under the dry cleaner program, many of
the elements discussed above for use of the Triad approach were applied there.

The planning process for the site assessment at CDR involved documentation of the site history and
previous site findings, potential migration pathways, data gaps, a flexible scope of work for field data
collection, and site-specific  data quality objectives.  The contractor identified four primary focus areas for
the CDR site.  The contractor then investigated soil and groundwater using field-based analyses. Analysis
for total VOCs in headspace using flame ionization and photoionization detectors was performed to
identify suspected petroleum and other solvents in soil samples, and Color-Tec analysis was used to
identify suspected chlorinated solvents in soil and groundwater samples.  CDR site assessment results
indicated increased certainty in targeting hot spots, less use of definitive sampling (only in source areas),
and increased sampling density and site coverage compared with a traditional site assessment process.

Points of Contact:
Bill Burns
Doug Fitton
Joseph McGarrity
FDEP Dry Cleaner Remediation Program
Telephone: (850) 245-8927

Sources of Additional Information:
FDEP, Division of Waste Management, Bureau of Waste Cleanup, Hazardous Waste  Cleanup Section.
"The Florida Dry Cleaning Solvent Cleanup Program." PowerPoint Presentation at
http://www.dep.state.fl.us/waste/categories/drycleaning/default.htm. Accessed on December 30, 2003.
U.S. Environmental Protection Agency
Office of Solid Waste and Emergency Response
Brownfields and Land Revitalization Technology Support Center    42

-------
         Understanding Procurement for Sampling and Analytical Services Under a Triad Approach

Ruth Heggen, FDEP. "Request for Statements of Qualifications (RFSOQ) for Hazardous Waste Site
Cleanup Services." Solicitation Number 2002012C. January 25, 2002. Addendum. February 15, 2002.
Ruth Heggen, FDEP. "Tabulation of Results of Oral Discussions. Request for Statements of
Qualifications (RFSOQ) for Hazardous Waste Site Cleanup Services." Solicitation Number 2002012C.
August 19, 2002.
LFR Levine-Fricke Inc.  "Initial Site Assessment Work Plan, Concord Custom Cleaners #50, Tallahassee,
Florida." Prepared for FDEP. FDEP Module Number D244.  LFR Project Number 6027.00. Octobers,
2001.
Joseph McGarrity, FDEP, and Perry Kelso, Ecology and Environment, Inc. "Initial Site Screening Using
Dynamic Field Activity: Galloway Drum Recycling Site, Auburndale, Polk County, Florida."  EPA
Internet Seminar.  December 16, 2003. www.cluin.org.

3.2.2       Use of In-House Field Capabilities  for Ohio EPA Site Assessments

3.2.2.a        Background

Ohio EPA provides support to its Brownfields and voluntary action sites through use of its own field staff
and equipment. Ohio EPA uses its field capabilities to provide real-time results, support targeted
sampling, and delineate hot spots or areas of concern.  These capabilities are provided through Ohio
EPA's SIFU. Since 1993, SIFU has conducted assessments at potential Superfund sites under an
agreement with EPA. The types of services available from SIFU include soil and groundwater
investigations (such as Geoprobe investigations), field screening for metals and organics, geographic
information system (GIS) and geopositional satellite (GPS) services, contaminated sediment
investigations, and ecological assessments.  SIFU's mobile laboratory capabilities include field GC, XRF,
IA test kit, and HazCat kit services.

Recently SIFU provided site sampling services for a Phase 2 voluntary action program investigation at the
former Starkey Junkyard site in Uhrichsville, Ohio. The results of the investigation will be used as part of
an application for cleanup funds from the Clean Ohio Fund. The Starkey Junkyard site was used for more
than 60 years as an auto salvage yard.  Numerous potential releases of automotive fluids and other
materials were suspected at the site, and it contained used batteries, scrap metals, and burned tires.
Contaminants of potential concern included VOCs, SVOCs, TPH, PCBs, and metals.

The Village of Uhrichsville is planning to reuse the site as a park and baseball field and requested a
targeted Brownfields assessment from Ohio EPA. As part of the Brownfields assessment request, village
staff met with SIFU personnel and certified professionals to develop a work plan and data quality
U.S. Environmental Protection Agency
Office of Solid Waste and Emergency Response
Brownfields and Land Revitalization Technology Support Center     43

-------
         Understanding Procurement for Sampling and Analytical Services Under a Triad Approach

objectives through a systematic planning process.  The scoping meeting identified the decisions to be
made, inputs to the decisions, the study boundaries, decision rules, limits on decision errors, and the
design for a dynamic sampling and analysis program.

Field work  included use of a Geoprobe to collect soil samples and an on-site mobile laboratory to screen
samples for VOCs, PCBs, and metals. More than 2,000 samples were analyzed. Ohio EPA staff also
performed an assessment of biological and water quality and conducted sediment sampling in a creek
adjacent to  the site.  The field work revealed elevated concentrations of lead and arsenic as well as TPH
(measured as diesel range organics) in soil and sediment.

3.2.2.b         Procurement Information - Ohio EPA

Ohio EPA makes field capabilities available to communities for which the cost of assessment would
otherwise be prohibitive.  This service provides site decision-makers with the opportunity to perform
systematic planning separately from procurement of sampling and analytical services. SIFU services can
be provided for complete site assessments or as a supplement to other site assessment work performed by
contractors. For example, at the Starkey Junkyard site in Uhrichsville, Ohio, SIFU performed all the site
assessment activities. The sampling and analytical equipment used by SIFU is owned by Ohio EPA,
including a mobile laboratory with field GC, XRF, and IA test kit capabilities; and the equipments was
procured approximately 5 years ago using grant funds. Ohio EPA personnel perform the field sampling
and analyses. Additional information about Ohio EPA's in-house field capabilities is provided in
Attachment H.

Points of Contact:
Jessica Page
Ohio EPA
Division of Emergency and Remedial Response
Site Assessment and Brownfield Revitalization Program
Telephone: (614) 644-3749
E-mail:  Jessica.page@epa.state.oh.us
Gavin Armstrong
Ohio EPA
Site Investigator
Division of Emergency and Remedial Response-SIFU
Telephone: (614) 644-3020
E-mail:  gavin.armstrong@epa.state.oh.us
Web: http://wwwr.epa.state.oh.us/derr/SABR/sifumobile/sifumobile.html
U.S. Environmental Protection Agency
Office of Solid Waste and Emergency Response
Brownfields and Land Revitalization Technology Support Center    44

-------
         Understanding Procurement for Sampling and Analytical Services Under a Triad Approach
Sources of Additional Information:
Jessica Page, Ohio EPA. 2003. "Ohio's In-house Field Capabilities."  Presentation at National Site
Assessment Conference. May 8.
Gavin Armstrong, Ohio EPA.  2003.  "Targeted Brownfield Assessment, City of Uhrichsville." Letter to
Laura Ripley, EPA Region 5.  September 11.
Gavin Armstrong, Ohio EPA.  2003.  "Case Study: Starkey Junkyard, Uhrichsville." Voluntary Action
Program Annual Training.  September 12.
Christina Benedict, Tetra Tech EM Inc. 2003.  Record of Telephone Conversation with Gavin
Armstrong, Ohio EPA, Regarding the Starkey Junkyard Site in Uhrichsville, Ohio. December 10.

3.3    LOCAL GOVERNMENT CASE STUDY
This section presents a case study for the Assunpink Creek site in New Jersey that involved use of direct-
push sampling and the Triad approach.

3.3.1       Direct-Push Sampling at the Assunpink Creek Greenway Project, Trenton, New Jersey

3.3.1.a         Background

The Assunpink Creek Greenway Project is being performed to redevelop Brownfields properties along
Assunpink Creek in Trenton, New Jersey, into a recreation area and greenway. The City of Trenton has a
memorandum of agreement with the New Jersey Department of Environmental Protection (NJDEP) to
include several of these properties in a VCP.  Based on a preliminary assessment of contamination, it was
decided to investigate areas of concern at two of the project sites, the Crescent Wire and Freight Yard
sites, using a dynamic work strategy based on the Triad approach.

The Crescent Wire site was used for the manufacture of high-tension cables and wire. A preliminary
CSM showed that there had been PCB and TPH impacts at the site and that these contaminants were
present in overlying, unsaturated soils, forming a thin floating layer on the water table surface at a depth
of 12 to 14 feet bgs. To help refine the CSM, a dynamic investigation approach was developed to identify
which of four potential scenarios applied to the site. These scenarios included the  possibilities that (1) the
impacted area was confined to a small hot spot with limited migration potential, (2) the floating plume
had migrated downgradient but not as far as the creek, (3) the floating layer had migrated to the creek,
and (4) the source of the floating product was upgradient and off site.

U.S. Environmental Protection Agency
Office of Solid Waste and Emergency Response
Brownfields and Land Revitalization Technology Support Center    45

-------
         Understanding Procurement for Sampling and Analytical Services Under a Triad Approach

The Freight Yard site was historically used as a railroad freight depot and includes a rail area, an area
with a concrete building used to house electrical equipment (Block 305), a powerhouse, and loading
platforms. Near-surface soils in the rail area have been impacted by historical site activities. A
preliminary CSM showed that there were impacts from heavy metals (arsenic, lead, zinc, and copper) as
well as PAHs, PCBs, and TPH.  To help refine the CSM, a dynamic investigation approach was
developed to address three potential scenarios:  (1) the contamination was shallow, and there had been no
migration; (2) the depth of contamination was moderate, and there had been limited migration but none to
groundwater; and (3) contamination was fairly extensive and variable, and there was TPH migration close
to the water table.

At Block 305 of the Freight Yard site, there is a relatively small, abandoned, concrete block building
believed to have contained electrical equipment. Several rusting and degraded 5 5-gallon drums found
adjacent to the building were removed. The objective for the dynamic investigation in this area was to
delineate the lateral and vertical extent of soil impacts and to determine whether contamination in soil had
the potential to impact groundwater. The COCs for this area included PAHs, TPH, and selected metals.

3.3.1.b         Procurement Information - Assunpink Creek Greenway Project

The City of Trenton issued an RFP to obtain site investigation services for the sites, as shown in
Attachment I.  The RFP provided a general description of the project and the sites, discussed the planned
reuse of the sites and the investigation objectives, provided decision guidance and results from previous
investigations, included a request that bidders propose a dynamic approach (including use of field
analytical methods), and provided technical specifications for 24 individual tasks. These tasks ranged
from a baseline ecological evaluation to a geophysical survey to an investigation of PCB and oil impacts
at the Crescent Wire site.  The RFP also provided an overall project schedule and information about the
basis for measurement and payment for each task. Generally payment was to be made after all work on a
task was completed and a proper invoice was provided. Furthermore, the RFP provided a pricing form
that identified, for each of the 24 tasks, the  specific items to be included in the task, the  estimated quantity
for each item (for example, five PCB analyses), and the unit basis for the item (for example, lump sum,
per sample, per day, per well, per drum, per boring, or per ton). Most tasks that involved sample
collection and analysis were costed on a per sample basis. The RFP also addressed sites not intended to
be assessed using the Triad approach.
U.S. Environmental Protection Agency
Office of Solid Waste and Emergency Response
Brownfields and Land Revitalization Technology Support Center    46

-------
         Understanding Procurement for Sampling and Analytical Services Under a Triad Approach

The city retained two firms to conduct further investigations at the sites, including a lead environmental
consulting firm and a subcontracted smaller firm specializing in field methods. The firms were selected
based on their experience, including their work at similar sites, qualifications, proposed costs,
responsiveness, and innovative approach. These firms developed the dynamic work strategy for the sites
and proposed specific field analytical methods with criteria and QA/QC information for each COC (see
Attachment I). For example, for the Crescent Wire site, they proposed IA test kits for both PCBs and
TPH and XRF analysis for metals. For the rail area of the Freight Yard site, they proposed IA test kits for
PCBs, field GC/MS analysis for both PAHs and TPH, and XRF analysis for metals.

The project provides an example of how a systematic plan based on a dynamic work strategy can be
developed separately from and prior to the field investigation activities. The work plan included a
preliminary CSM as well as possible scenarios needed to refine the CSM. For each of the sites, the work
plan discussed the project objectives, COCs, decision rules, and technical approach. This approach
included use of both field analytical methods and fixed laboratory analysis of confirmation samples.

In addition, the project illustrates how multiple sites can be bundled together for an area-wide
investigation to achieve a streamlined approach and economies-of-scale. In this case,  a single work plan
was developed that addressed all the sites. Nondynamic tasks were completed first, followed by dynamic
tasks. The investigation for the Crescent Wire site was performed in  a single mobilization, as was the
investigation for the Freight Yard site.

Points of Contact:
Leah Yasenchak
Brownfields Redevelopment Solutions, Inc.
Project Manager for the City of Trenton
Telephone: (609) 989-4238 or (732) 292-2624
E-mail:  leah@njbrownfield.com
Nicholas De Rose
Langan Engineering and Environmental Services, Inc.
500 Hyde Park
Doylestown, PA
Telephone: (215)348-7101
E-mail:  nderose@langan.com
U.S. Environmental Protection Agency
Office of Solid Waste and Emergency Response
Brownfields and Land Revitalization Technology Support Center    47

-------
         Understanding Procurement for Sampling and Analytical Services Under a Triad Approach

Sources of Additional Information:
City of Trenton.  "Request for Proposals - Greenway Sites."  No Date.
Langan Engineering and Environmental Services, Inc., and S2C2 Inc. "Dynamic Workplan for Site
Investigation and Remedial Investigation Activities - Assunpink Creek Greenways Project." Prepared for
City of Trenton Department of Housing and Development. December 18, 2002.
James Mack, Fred Ellerbusch, and William Librizzi, New Jersey Institute of Technology (NJIT).
"Characterizing a Brownfields Recreational Reuse Scenario Using the Triad Approach - Assunpink
Creek Greenways Project." Remediation. Autumn 2003.

3.4    PRIVATE SECTOR CASE STUDY

This section presents a case study for the Lake Success Business Park site in Connecticut that involved
use of real-time measurement technologies.

3.4.1       On-Site Lead Analysis at Lake Success Business Park (DuPont), Connecticut

3.4.1.a        Background

Lake Success Business Park (LSBP) in Bridgeport, Connecticut, is a 422-acre site that was owned by
Remington Arms Company until 1989 and was operated as a small arms and ammunition storage and
manufacturing facility. The site is currently owned by a subsidiary of DuPont, which is  developing the
site into a business park.  As a result of the arms storage  and manufacturing activities, site soil is
contaminated with lead and other metals. In the early 1990s, a RCRA facility investigation identified 51
areas of environmental concern, with lead as the primary contaminant in soil.  EPA assigned two action
levels for lead at the site: 500 parts per million (ppm) for areas within the boundaries of  a buffer zone and
1,000 ppm for non-buffer zone areas. LSBP is an interim status RCRA facility with corrective action
being performed by the site owner under an administrative consent order.

The site contractor used XRF analysis of soil samples to support site characterization and remedial
decision-making, as  shown in Attachment J. Decisions were  made to delineate and confirm soil
excavation boundaries. Ten percent of confirmation and post-excavation samples were analyzed by an
off-site laboratory using EPA SW-846 Method 3050 (acid-soluble sample digestion) and Method
3050/6010 (ICP-atomic emission spectroscopy), and the  results were compared with the  XRF data.
U.S. Environmental Protection Agency
Office of Solid Waste and Emergency Response
Brownfields and Land Revitalization Technology Support Center    48

-------
         Understanding Procurement for Sampling and Analytical Services Under a Triad Approach

The project team collected nearly 8,000 samples for XRF analysis. Of these, 793 sample pairs were
evaluated using off-site laboratory analysis (as of fall 1999). Comparison results demonstrated 99.0
percent agreement with respect to the  1,000-ppm action level and 97.4 percent agreement with respect to
the 500-ppm action level.

3.4.1.b         Procurement Information - Lake Success Business Park

The XRF work at LSBP was performed by the URS Diamond Group (URS) under an existing contract
with DuPont to provide site investigation services.  To provide a cost estimate for the XRF analyses, URS
first prepared a sheet of unit costs with estimated quantities. URS then compared the XRF costs with the
unit and total estimated costs for conducting conventional metal analyses at an off-site laboratory.

For the project, URS purchased the XRF analyzer and conducted the analyses using field personnel. URS
also decided to use aggressive sample preparation steps that included homogenizing, sieving, drying, and
grinding. At the time (the late 1990s), these protocols and the associated instrumentation were considered
to be requirements for XRF analyses.  However, more recently, both the instrumentation and the
understanding of the benefits of practices such as grinding have changed dramatically.

After the project was completed, a cost evaluation was conducted by EPA to compare the use of XRF
analysis at the site with conventional laboratory analyses. EPA estimated that up to 50 percent savings
were realized through the use of XRF analysis without compromising the reliability of project decision-
making.  EPA considered only the costs of analysis because field personnel were required to be on site for
sampling under both scenarios. In addition to the analytical cost savings, the use of field analytical
technologies saved time and labor by minimizing downtime and the number of mobilizations; the costs
associated with the time and labor savings were not quantified in the cost evaluation.

Points of Contact:
Stephanie Carr
RCRA Facility Manager
EPA Region 1
Telephone: (617) 918-1363
E-mail: carr.stephanie@epa.gov
Scott Northey
Assistant Project Scientist
URS
Telephone: (302) 892-8040
U.S. Environmental Protection Agency
Office of Solid Waste and Emergency Response
Brownfields and Land Revitalization Technology Support Center    49

-------
          Understanding Procurement for Sampling and Analytical Services Under a Triad Approach
Source of Additional Information:

EPA. "Innovations in Site Characterization - Technology Evaluation:  On-site Lead Analysis Using a
Field Portable XRF Analyzer." Draft.  August 2002.
U.S. Environmental Protection Agency
Office of Solid Waste and Emergency Response
Brownfields and Land Revitalization Technology Support Center    50

-------
          Understanding Procurement for Sampling and Analytical Services Under a Triad Approach


                                     4.0     CONCLUSIONS


The Triad approach has been successfully used in the federal, state, local, and private sector arenas to

reduce uncertainty, improve decision-making, and reduce overall project costs and timelines. Flexibility

and adaptability are key components of the Triad approach and have been viewed as challenges when

services are procured under systems that have been designed for more traditional approaches. This

document provides innovative strategies and approaches used by the federal and nonfederal sectors to

successfully procure services under a Triad framework as well as relevant case study examples.  Keys to

success in such procurement efforts include:
    •   Involving technical experts and project managers who understand the Triad approach and the
        specific project requirements in the procurement process to ensure that the Triad considerations
        for the project are appropriately incorporated into the process. This is especially important if the
        buyer does not have a technical background.

    •   Involving the contracting staff in the planning process before the final procurement strategy is
        identified. Experienced contracting staff can identify the best contract mechanism and approach
        to provide for the flexibility and adaptability required under the Triad approach while maintaining
        appropriate controls over the contract and the project.

    •   Using unit costs to allow better estimating and tracking of project costs under the Triad approach.
        A unit cost under a Triad approach is defined as a discrete activity that can be used as a basis for
        estimating and tracking costs. Unit costs are site-specific and need to be customized to meet the
        specific needs of a project. Development of options and unit rates based on the anticipated data
        needs of a project will increase the flexibility of a procurement as well as project efficiency.  A
        planning process that allows decision-makers to understand the specific services and equipment
        to be provided and the associated "units" is essential for a successful procurement.

    •   Clearly identifying the specific Triad considerations for a project, including the three primary
        components of the Triad approach (systematic project planning,  dynamic work strategies, and
        real-time measurement technologies), fixed-unit costs, and flexibility. Project-specific definition
        of these considerations is important to ensure that sufficient time and resources are allocated for
        the thorough, up-front planning required by the Triad approach.  Moreover, the performance
        criteria for a SOW or work plan must reflect these Triad considerations.

    •   Clearly identifying how flexibility will be incorporated into the project while maintaining control
        over overall project and contract objectives.  This requires up-front planning to establish (1) clear
        decision criteria for data collection; (2) clear methods and lines of communication to facilitate
        rapid decision-making, including real-time meetings and effective coordination among decision-
        makers; (3) a clear understanding of the cost implications of scope changes and how optional
        tasks will be triggered and managed; (4) a rationale for "ranges" of samples to be collected and
        analyzed; and (5) clear decision rules for how sampling locations may be determined and revised
        in the field.
U.S. Environmental Protection Agency
Office of Solid Waste and Emergency Response
Brownfields and Land Revitalization Technology Support Center    51

-------
         Understanding Procurement for Sampling and Analytical Services Under a Triad Approach

    •   Considering use of a two-part approach to procurement in which the up-front planning is
        procured as a separate activity from the field implementation services.  A two-part approach can
        provide the buyer with several advantages.  For example, if the buyer does not possess the
        necessary technical expertise, this approach gives the buyer the ability to procure the expertise
        needed to develop a systematic plan with sufficient technical detail for the SOW in order to
        procure the field services. In addition, this approach gives the buyer the ability to increase
        competition for the work by allowing a broader universe of contractors to bid on the field work
        component. A two-part approach is also useful in cases where different contractors have different
        skills and areas of expertise.  This type of approach was used at the Wenatchee Tree Fruit site
        discussed in Section 3 of this document.

The use of the Triad approach provides opportunities for better, more cost-effective solutions to
environmental problems compared to traditional approaches.  By using systematic project planning,
dynamic work strategies, and real-time measurement technologies, decision uncertainty can be actively
managed, improving decision-making and reducing overall project costs and timeframes.  The
information presented in this document, including the six case studies presented in Section 3, illustrates
how the federal,  state, local, and private sectors have used innovative strategies and approaches to
successfully procure services under a Triad framework.

Additional information about procurement of sampling and analytical services under a Triad approach can
be obtained from the BTSC at www.brownfieldstsc.org. Additional information about EPA procurements
can be obtained from the  Office of Acquisition Management at www.epa.gov/oam/ or from the
Contracting Officer for a specific procurement. The chart on the following page refers users to  additional
information available about procurement under a Triad approach.
U.S. Environmental Protection Agency
Office of Solid Waste and Emergency Response
Brownfields and Land Revitalization Technology Support Center     52

-------
          Understanding Procurement for Sampling and Analytical Services Under a Triad Approach
                  Additional Information Related to Procurement in Attachments
        Attachment
       Description
                  Location
 A - Triad Overview
Provides an overview of the
key concepts, requirements,
and benefits of the Triad
approach, including a brief
summary of the Triad
approach.	
http://www.triadcentral.org/over/index.cfm
 B - Overview of Field-
     Based Measurement
     Technologies
Provides a summary of
information about selected
sampling technologies such
as direct push technologies
and techniques, and field-
based measurement
technologies that can be
used under a Triad
approach.	
http://www.triadcentral.org/tech/index.cfm
 C - Pertinent Resources
Provides information on
references and resources
about procurement and
innovative technologies
related to the Triad
approach.	
http://www.triadcentral.org/ref/index.cfm
 D - Glossary
Provides descriptions of key
terms used in this document.
http://www.triadcentral.org/gloss/index.cfin
 E - McCormick and Baxter
    Site Information
Includes the scope of work
used to procure sonic
drilling services for this site.
http://www.brownfieldstsc.org/procurement ex.cfm
 F - Wenatchee Tree Fruit
     Site Information
Includes two versions of a
case study (one by EPA and
one by the USAGE) about
the site investigation and
cleanup.  Also included are
the FSP, QAPP, and RAMP
for the site.
http://www.brownfieldstsc.org/procurement  ex.cfm
 G - Florida Department of
     Environmental
     Protection Program
     Information
Includes materials used to
solicit contractors for the
Dry Cleaner Remediation
Program, including example
rate categories.	
http://www.brownfieldstsc.org/procurement ex.cfm
 H - Ohio EPA Program
     Information
Provides background
information about the SIFU
program as well as materials
about one site investigated
by the SIFU.
http://www.brownfieldstsc.org/procurement ex.cfm
 I - Assunpink Creek,
    Trenton, New Jersey,
    Project Information
Includes the RFP used by
the City of Trenton to
procure Triad investigation
services for the site as well
as the dynamic work plan
used to guide the
investigation.	
http://www.brownfieldstsc.org/procurement ex.cfm
 J - Lake Success Business
    Park (DuPont) Project
    Information
Includes a case study about
the use of XRF field
analyses at the site.