DELEGATION TO STATES
O AS DELEGATION IS ACHIEVED JT BECOMES INCREASINGLY IMPORTANT FOR EPA
TO DETERMINE THE QUALITY OF THE STATE EFFORT. WITH THIS GOAL IN
MIND, OANR, IN CONJUNCTION WITH STAPPA/ALAPCO, IS DEVELOPING A
NATIONAL AIR AUDIT SYSTEM (NAAS) THAT WILL PROVIDE CONSISTENCY TO
REGIONAL OFFICE AUDIT EFFORTS. THIS SYSTEM WILL FORM AN IMPORTANT
FOUNDATION FOR EPA OVERSIGHT IN THE AIR PROGRAM OVER THE COMING
YEARS.
o A SURVEY OF EXISTING AND PROPOSED AUDIT EFFORTS IS UNDERWAY IN THE
REGIONS FOR SELECTION OF KEY AIR PROGRAM AUDIT AREAS IN FY 84.
o IN AN EFFORT TO ENCOURAGE STATE ENFORCEMENT OF ANTI-TAMPERING AND
ANTI-FUEL SWITCHING PROGRAMS, OANR ISSUED A REGIONAL GUIDANCE PACKAGE,
REGIONS ARE DEVELOPING SCHEDULES FOR NUMBERS OF PROGRAMS TO BE
ESTABLISHED IN FY 83.
-9-
-------
MEETING PROGRAM COMMITMCNTS
PROGRESS ON LEAD SIPS
O THE NRDC HAS SUED EPA FOR FAILURE TO DEVELOP STATUTORILY REQUIRED
STATE PLANS FOR CONTROL OF AMBIENT LEAD LEVELS.
O EPA HAS ACTED ON FINAL LEAD PLANS FOR ABOUT HALF OF THE STATES, BUT
THE NRDC WANTS EPA TO EXPEDITE THE DEVELOPMENT AND APPROVAL OF
PLANS FOR THE REST OF THE STATES.
O ANALYSIS OF THE FULL IMPACT OF THE NRDC LAWSUIT HAS BEEN DELAYED
PENDING SETTLEMENT OF THE LAWSUIT. ONCE THE ANALYSIS IS COMPLETED,
GUIDANCE WILL BE ISSUED TO THE REGIONS AND SCHEDULES FOR SUBMITTING
THE REMAINING SIPs WILL BE NEGOTIATED.
PROGRESS ON 1982 OZONE/CO SIPS
o SUBMISSION OF REQUIRED SIPS WAS ACCOMPLISHED BY ALL REGIONS.
HEADQUARTERS AND OMB REVIEWS PRIOR TO FEDERAL REGISTER PUBLICATION
ARE UNDERWAY. PUBLICATION OF ALL PROPOSALS IS DUE BY THE END OF
JANUARY.
10-
-------
MEETING PROGRAM COMMITMENTS
SPECIAL ACTION SIPS
SUMMARY OF LEAD SIP STATUS
STATES WITH COMPLETE FINAL RULEMAKING 23
STATES WITH PARTIAL FINAL RULEMAKING 5
STATES WITH COMPLETE SUBMITTALS NEEDING EPA ACTION. 6
STATES WITH PARTIAL SUBMITTALS NEEDING EPA ACTION.. 3
STATES WITH NO LEAD SIPs
STATES WITH PROJECTED SUBMISSION DATES 18
STATES WITH NO PROJECTED SUBMISSION DATES 9
TOTAL 56
SUMMARY OF STATUS OF 1982 OZONE/CO SIPs
REVIEWING OFFICE: HQ STAFF AA(OANR) OMB F.R. OFFICE
NUMBER OF SIPs(32): 2 4 18 8
-11-
-------
MEETING PROGRAM COMMITMENTS
PERCENT OF SIP REVISIONS PROCESSED ON TIME
O DESPITE THE TREND OF INCREASED NUMBER OF SIP REVISIONS RECEIVED EACH
QUARTER, AN EXCELLENT RECORD HAS BEEN ESTABLISHED FOR TIMELY PROCESSING
OF SIP REVISIONS:
- 93% WITHIN THE FIVE MONTHS REGIONAL TARGET (OF 231 UNFINISHED
ACTIONS AT THE END OF THE FIRST QUARTER, 15 EXCEEDED THE TARGET).
83% WITHIN THE TWO MONTHS HEADQUARTERS TARGET (OF 84 UNFINISHED
ACTIONS AT THE END OF THE FIRST QUARTER, 14 EXCEEDED THE TARGET).
O SIP DELAYS ARE RESULTING FROM:
- HOLD UP OF ALL NEW SOURCE REVIEW ACTION BY NRDC LAWSUIT;
- CONTINUED OMB DELAYS;
- NEED FOR MAJOR POLICY DECISIONS (E.G., LARGE POWER PLANT SO2
RELAXATIONS, SHUT DOWN CREDITS FOR STEEL BUBBLES).
-12-
-------
100
#SIPs IN PROCESS: 315
ro
eo
ui
trt
O
PERCENT OF SIP REVISIONS
PROCESSED ON TIME
As Of December 31, 1982
TARGET
2 3
QUARTERS
Legend
IZ2 HEADQUARTERS ( TARGET - 2 MOS. )
• REGIONS ( TARGET - 5 MOS. )
NATIONAL
LATE
9.2X
-13-
-------
DEVELOPING AND REVIEWING CRITICAL REGULATIONS
REDUCING THE BACKLOG OF NEW SOURCE PERFORMANCE STANDARDS (NSPS)
O AS A RESULT OF THE PED STUDY ON THE NSPS PROGRAM, OANR DID NOT SUBMIT
ITS ORIGINAL SCHEDULES FOR FY 83 NSPS DEVELOPMENT. REVISED SCHEDULES
WILL BE IN EFFECT (AND REPORTED ON) FOR THE SECOND QUARTER. OANR,
OPRM AND OLEC HAVE JOINTLY COMMITTED TO EXPLICIT EFFORTS TO IMPROVE
PERFORMANCE IN THIS AREA.
O BASED ON FY 82 COMMITMENTS (ILLUSTRATED BELOW) ONLY 3 OF 8 PROPOSALS
AND 4 OF 8 PROMULGATIONS DUE FOR PUBLICATION BY 12/31/82 WERE ACHIEVED.
THIS LEAVES 8 PROPOSALS AND 5 PROMULGATIONS ORIGINALLY DUE IN FY 82
YET TO BE PUBLISHED. CONSIDERABLE WORK REMAINS TO BE DONE BY THE
ABOVE THREE OFFICES.
NSPS
SCHEDULES
PROPOSALS
PROMULGATIONS
BUDGET
16
13
82
ACTUAL
5
4
FY 83
• PLAN ACTUAL
01
8
8
01
3
4
PLAN
Q2
3
1
o INCLUDING THE LATE FY 82 STANDARDS, A TOTAL OF 21 PROPOSALS AND 12
PROMULGATIONS OF NEW STANDARDS ARE PROMISED IN FY 83. AT THIS
POINT, IT APPEARS DOUBTFUL THAT THIS AMBITIOUS SCHEDULE IS ACHIEVABLE,
-15-
-------
_ RE VI EW1 N_G _Cl_
OANR SCHEDULE FOR FY 83 PROPOSAL AND PROMULGATION
STTANDAR3
NATIONAL AMBIENT
CARBON MONOXIDE
PARTICULATE MATTER
NITROGEN DIOXIDE
SULFUR OXIDES
3/83
5/83
9/83
_QU_ALJTY_ STANDARDS
4/83
3/84
5/84
9/84
OFF SCHEDULE 1 MONTH;
I1-5SEP 1Q MILESTONE
ON SCHEDULE
OFF SCHEDULE 1 MONTH;
MISSED 10 MILESTONE
ON SCHEDULE
NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS
COKE OVEN (BENZENE)
ASBESTOS REVISION
BENZENE FUGITIVE
MALEIC ANHYDRIDE
(BENZENE)
ETHYBENZENE
STYRENE
BENZENE STORAGE
7/83
5/83
-
-
/83
/83
/83
/83
ON SCHEDULE
ON SCHEDULE; MET 1Q
MILESTONES
ON SCHEDULE
ON SCHEDULE
ON SCHEDULE
ON SCHEDULE
•16-
-------
DEVELOPING AND REVIEWING CRITICAL REGULATIONS
OANR SCHEDULE FOR FY 83 PROPOSAL AND PROMULGATION (CONT'D)
STANDARD
PROPOSAL
F.R. DATE
PROMULGATION
F.R. DATE
STATUS
RADIATION REGULATIONS
INACTIVE URANIUM
MILL TAILINGS SITES
RADIONUCLIDES
NESHAP
DISPOSAL OF HIGH
LEVEL RADIOACTIVE
WASTE
ACTIVE URANIUM
MILL TAILINGS SITES
3/83
12/82
1/83
11/82
12/83
9/83
OFF SCHEDULE 1 MONTH;
FRM ON 1/5/83.
ON SCHEDULE
ON SCHEDULE; NPRM
ON 12/29/82.
OFF SCHEDULE 2 MONTHS;
OW AND OGC COMMENTS
DELAYED RED BORDER.
MOBILE SOURCES REGULATIONS
HD-MY 84
POSTPONEMENT
HD-HC/CO REVISION
LD DIESEL AVERAGING
LD DIESEL
POSTPONEMENT
LEAD PHASEDOWN
12/82
1/83
9/83
12/82
11/82
ON SCHEDULE; FRM ON
1/12/83
ON SCHEDULE
OFF SCHEDULE 3 MONTHS;
RESOURCES SHIFTED TO
HIGHER PRIORITY
PROJECTS.
ON SCHEDULE; NPRM ON
12/1/82
ON SCHEDULE; FRM ON
10/29/82
-17-
-------
ENFORCEMENT
O A DOWNWARD TREND IN THE NUMBER OK SIGNIFICANT VIOLATORS HAS OCCURRED
SINCE TRACKING BEGAN IN FY 82. HOWEVER, TWO-THIRDS OF THE CURRENT
INVENTORY OF STGN1FICANT VIOLATORS HAVE BEEN OUT OF COMPLIANCE FOR
MORE THAN TWO QUARTERS .
o AT THE END OF THE FIRST QUARTER, MAJOR SOURCES (OF WHICH THERE ARE
29,552) SHOWED A 93% COMPLIANCE RATE (AN ADDITIONAL 2% ARK ON ACCEPTABLE
COMPLIANCE SCHEDULES).
o IN CONTRAST WITH THE APPARENT HIGH COMPLIANCE RATE FOR MAJOR SOURCES,
NATIONAL INSPECTION RATES ARE LOW:
48% OF THE LARGEST POLLUTING SOURCES (CLASS Al ) DUE FOR INSPECTION
WERE ACTUALLY INSPECTED;
- 68% OF THE SMALLER SOURCES (CLASS A2) DUE FOR INSPECTION WERE
ACTUALLY INSPECTED.
O IN ADDITION, THE RANGE OF INSPECTION RATES VARIED WIDELY AMONG THE
REGIONS:
CLASS Al
A LOW OF 13% IN REGION VIII A LOW OF 48% IN REGION II
A HIGH OF 90% IN REGION III A HIGH OF 89% IN REGION III
O THE REASONS FOR THE LARGE DIFFERENTIALS IN INSPECTION RATES BETWEEN
CLASS Al AND CLASS A2 AND AMONG REGIONS FOR BOTH CLASSES OF SOURCES
HAS NOT BEEN DETERMINED. THE PROGRAM OFFICE IS CONDUCTING FURTHER
INVESTIGATION INTO THESE QUESTIONS.
-18-
-------
to
JO
V)
o
400-,
PROGRESS IN RETURNING AIR VIOLATORS TO COMPUANCE
As Of December 31, 1982
234
QUARTER
Legend
CD NEW VIOLATORS
123 VIOLATORS BEGINNING OF YEAR
•I ACHEIVED COMPLIANCE
K3 PUT ON COMPLIANCE SCHEDULES
ES VIOLATORS LONGER THAN 2 QUARTERS
tZZI VIOLATORS AT END OF QUARTER
1400n
23
QUARTER
* INCLUDES SIGNIFICANT VIOLATORS
-19-
-------
OFFICE OF PESTICIDES AND TOXIC SUBSTANCES
TABLE OF CONTENTS
GOAL PAGE
MEETING PROGRAM COMMITMENTS 22
DEVELOPING AND REVIEWING CRITICAL REGULATIONS 37
ENFORCEMENT 38
i
IMPROVING THE QUALITY OF EPA SCIENCE 44
-21-
-------
MEETING PROGRAM COMMITMENTS
PESTICIDE REGISTRATION APPLICATIONS
CURRENT APPLICATIONS
o OPTS COMPLETED AN AVERAGE OF 98% OF ALL APPLICATIONS WITHIN THE
ADMINISTRATIVE TIMETABLE.
o SLIGHT PROCESSING DELAYS CONTINUE TO OCCUR IN NEW CHEMICAL REVIEWS,
93% OF WHICH WERE COMPLETED WITHIN THE TIMETABLE.
o OF 4,357 APPLICATIONS PROCESSED, 21% RESULTED IN INTERIM RESPONSES
REQUIRING MORE INFORMATION.
BACKLOG
o THE NUMBER OF BACKLOGGED APPLICATIONS REMAINED LOW THOUGH IT
INCREASED SLIGHTLY FROM 18 TO 31 IN THE FIRST QUARTER. THIS
COMPARES TO A BACKLOG OF 554 APPLICATIONS AT THE SAME TIME
LAST YEAR.
-22-
-------
K)
ui
)
2
O
UI
u
o:
UJ
Q.
TOTAL
PROCESSED :
PESTICIDE REGISTRATION APPLICATIONS
PERCENT OF FY-83 APPLICATIONS COMPLETED
WITHIN APPLICABLE TIMETABLE
As Of December 31, 1982
2 3
QUARTERS
i
4
4357
•TARGET
SIZE OF BACKLOG
60-i
45-
30-
15-
82 1 234
QUARTERS
NO. OF PENDING
APPLICATIONS WHOSE TIME
LIMIT HAS BEEN EXCEEDED
Legend
ACTUAL
TARGET
1*1ilFiM »*n
-23-
-------
MEETING PROGRAM COMMITMENTS
PESTICIDE FFDCA TOLERANCE PETITIONS
CURRENT PETITIONS
o OPTS MET THE STATUTORY DEADLINE IN 75% OP THE CASES. THIS
CONSTITUTES STEADY IMPROVEMENT FROM 69% AT THE END OK LAST
QUARTER AND 48% AT THIS TIME LAST YEAR.
o THE TARGET WAS LOWERED FROM 95% EFFICIENCY IN FY 82 TO 85% THIS YEAR,
THIS REFLECTS DIFFICULTIES INVOLVED IN MEETING THE DEADLINE DURING
FY 82.
BACKLOG
o OPTS WAS UNSUCCESSFUL IN ITS BACKLOG-REDUCTION EFFORT—THE BACKLOG
OF UNPROCESSED APPLICATIONS INCREASED BY 70% IN THE FIRST QUARTER.
-24-
-------
ro
u
t/)
2
0
.
Ul
O
CK
LU
Q.
TOTAL
PROCESSED :
FFDCA TOLERANCE,PETITIONS
PERCENT OF FY-83 PETITIONS COMPLETED
WITHIN STATUTORY TIME LIMIT
As Of December 31, 1982
113
-TARGET
23
QUARTERS
SIZE OF BACKLOG
60 "l
30-
82 1 2 3 4
QUARTERS
NO. OF PENDING
PETITIONS WHOSE TIME
LIMIT HAS BEEN EXCEEDED
Legend
MRWT,,.,
-25-
-------
MEETING PROGRAM COMMITMENTS
PESTICIDE EXPERIMENTAL USE PERMITS
CURRENT APPLICATIONS
o OPTS MET THE STATUTORY DEADLINE IN 93% OF THE CASES, NEARLY
ACHIEVING THE TARGET OF 95%.
BACKLOG
o OPTS CONTINUED TO MAINTAIN A LOW BACKLOG OF ACTIONS. ONLY 4 ACTIONS
REMAIN BACKLOGGED, COMPARED TO 25 AT THE SAME TIME LAST YEAR.
-------
lOO-i
95
s
U 50-
o:
bj
0.
0-
oo
> TOTAL
w PROCESSED :
to
O
EXPERIMENTAL USE PERMIT APPLICATIONS
PERCENT PROCESSED ON TIME
As Of December 31, 1982
f* .Tionrr C17C" C\C DA^l/l f\f~*
HinH • TAROET ^>\DL. Ur bALKLUb
HB 101
^W
..,,,, .
i i i i
BH9 82 1 234
HjHi QUARTERS
llMmi N0. OF APPLICATIONS
•ft*!™ WHOSE TIME LIMIT
^^^^^"* \ • | | HAS BEEN EXCEEDED
1234
QUARTERS
Legend
ACTUAL
«8 TARGET
i * 1 1 1 1 1 i i 1 1 * I
•27-
-------
REVIEWDEC I SIONS
o NO SPECIAL REVIEW DECISIONS WERE COMPLETED IN THE FIRST QUARTER.
o OPTS ATTRIBUTES THIS DECLINE IN PERFORMANCE TO A TRANSFER OF SOME
SENIOR OPP PERSONNEL TO OTS TO CORRECT A CEILING IMBALANCE.
-28-
-------
K)
to
Ul
trt
PESTICIDE SPECIAL REVIEW DECISIONS
CUMULATIVE NUMBER OF DECISIONS COMPLETED
As Of December 31, 1982
g
8
Q
U.
O
•
O
10
0
2 3
QUARTERS
Legend
•I ACTUAL
E3 TARGET
-29-
-------
PESTICIDE REGISTRATION STANDARDS
O OPTS ESTABLISHED THREE INSTEAD OF FOUR REGISTRATION STANDARDS
IN THE FIRST QUARTER. HOWEVER, TWO ADDITIONAL STANDARDS HAVE
ALREADY BEEN ESTABLISHED EARLY IN THE SECOND QUARTER.
o THE THREE FIRST QUARTER STANDARDS COVER REREGISTRATION REQUIRE-
MENTS FOR 430 PESTICIDE PRODUCTS; 150 PRODUCTS COVERED BY THE BORIC
ACID STANDARD QUALIFY FOR A POSSIBLE EXEMPTION FROM REGISTRATION
REQUIREMENTS UNDER FIFRA SECTION 25(5).
o TWO OVERDUE ACTION ITEMS, A CLEAR FORMAL MODEL OF THE PROGRAM AND
DOCUMENTED PROCEDURES FOR LINKING REGISTRATION STANDARDS REVIEWS TO
SUBSEQUENT REGISTRATION ACTIONS, WERE SUBMITTED TO OPRM THIS QUARTER
IN RESPONSE TO THE OPRM REGISTRATION STANDARDS EVALUATION. OPTS IS
ALSO DEVELOPING REVISED MEASURES OF PROGRAM PROGRESS FOR SUBMISSION
TO OPRM IN THE SECOND QUARTER.
-------
K)
S-
Ld
o
PESTICIDE REGISTRATION STANDARDS
CUMULATIVE NUMBER OF STANDARDS ESTABLISHED
As Of December 31, 1982
o.
2
o
o
•
o
2:
25-1
20-
15-
2 3
QUARTERS
Legend
• ACTUAL
EZJ TARGET
-31-
-------
ME ETING
INTERAGENCY TESTING COMMITTEE (ITC) DESIGNATIONS — PAST LISTS
O OPTS ACHIEVED ALL TARGETS IN THE FIRST QUARTER.
o THIRTEEN FINAL DECISIONS WERE SENT TO THE ITC:
EIGHT TESTING AGREEMENTS NEGOTIATED WITH INDUSTRY; AND
- FIVE DECISIONS NOT TO TEST.
O TARGETS HAVE BEEN SET FOR COMPLETION OF THE FINAL LIST THIS
CALENDAR YEAR, WHICH WILL TOTALLY ELIMINATE THE ITC BACKLOG.
-32-
-------
COMPLETED ITC DESIGNATIONS - PAST LISTS
ACTION
82 LIST
AA REVIEW
RESPOND TO ITC
83 LIST
PRELIMINARY
DECISION (OTS)
AA REVIEW
RESPOND TO ITC
e 13
chemicals
• 13
chemicaIs
o 13
chemicals
QUARTERS
o 13
chemicals
o 13
chemicals
FY 84
LEGEND
o DUE DATE
• DATE MET
-33-
-------
MEETING PROGRAM COMMITMENTS
INTERAGENCY TESTING COMMITTEE (ITC) DESIGNATIONS - NEW LISTS
o OPTS ^HIEVED_AJ.L_J[T^J^GETS IN THE FIRST QUARTER.
o THREE FINAL DECISIONS WERE SENT TO THE ITC:
- ONE NEGOTIATED TESTING AGREEMENT; AND
- TWO DECISIONS NOT TO TEST.
o FOUR PRELIMINARY DECISIONS WERE MADE:
- ONE DECISION TO NEGOTIATE A TESTING AGREEMENT; AND
- THREE DECISIONS TO INITIATE TEST RULES.
-34-
-------
COMPLETED ITC DESIGNATIONS - NEW LISTS
ACTION
9TH LIST
AA REVIEW
RESPOND TO ITC
10TH LIST
PRELIMINARY
DECISION (OTS)
AA REVIEW
RESPOND TO ITC
11TH LIST
PRELIMINARY
DECISION (OTS)
» 3
t
«
chemicals
» 3
chemicals
• 4
chemicals
c
>
c
1 2
LEGEND
chemicals
o 4
chemicals
o 4
(chemicals
o DUE DATE
• DATE MET
-35-
-------
MEETING PROGRAM COMMITMENTS
SUMMARY OF OPTS ACTIONS ON EXISTING CHEMICALS
ITEM
STATUS
o PCB REMAND—PROPOSED RULE FOR UNCONTROLLED
SYSTEMS.
MILESTONES SUBMITTED TO OMSE
ON SCHEDULE.
o FORMALDEHYDE INTERAGENCY AGREEMENT:
- FR NOTICE ANNOUNCING ESTABLISHMENT OF
CLEARINGHOUSE AND WORKSHOP.
COMPLETED ON SCHEDULE,
o FORMALDEHYDE CANCER CASE CONTROL STUDY.
ON SCHEDULE.
o FORMALDEHYDE QUARTERLY PROGRESS REPORT.
COMPLETED AHEAD OF SCHEDULE.
O 4,4' - METHYLENEBIS (2-CHLOROBENZENAMINE)— MILESTONES SUBMITTED TO OMSE
PROPOSED RULE. ON SCHEDULE.
-36-
-------
DEVELOPING AND REVIEWING CRITICAL REGULATIONS
SUMMARY OF FIRST QUARTER OPTS PROGRESS
ITEM
o FIFRA SECTION 3 REGULATIONS
STATUS
PROMULGATION MILESTONES SUBMITTED
TO OMSE ON SCHEDULE.
o OTHER FIFRA REGULATIONS:
OPP REVIEW SCHEDULES SUBMITTED
TO OMSE ON SCHEDULE. SCHEDULE
NEEDED FOR AA REVIEW.
REGISTRATION GUIDELINES
WORKER PROTECTION
EMERGENCY EXEMPTIONS
HEARING PROCEDURES
DISPOSAL AND STORAGE GUIDELINES
EXPERIMENTAL USE PERMITS
PNA POLICY STATEMENT
O TSCA PREMANUFACTURE NOTIFICATION
(PMN) EXEMPTION RULE.
DRAFT FINAL RULE SUBMITTED TO
STEERING COMMITTEE AHEAD OF
SCHEDULE.
o TSCA SECTION 5(h)(4) GENERIC
EXEMPTION RULES.
MILESTONES SUBMITTED TO
OMSE ON SCHEDULE.
-37-
-------
E^FORCJEI^ENT
FIFRA COMPLIANCE MONITORING INSPECTIONS
o OVERALL, THE REGIONS PERFORMED AHEAD OF SCHEDULE IN THE FIRST QUARTER,
COMPLETING 31% OF THE END-OF-YEAR TARGET OF 480 INSPECTIONS.
o EFFORTS IN THE SECOND QUARTER MUST FOCUS ON THE COMPLETION OF LABORATORY
AUDITS. NO PROGRESS HAS BEEN MADE TOWARD ACHIEVING THE END-OF-YEAR TARGET
OF 40 LABORATORY AUDITS.
-38-
-------
K)
00
U)
2
O
FIFRA COMPLIANCE MONITORING INSPECTIONS
AND ENFORCEMENT ACTIONS
CUMULATIVE NUMBER COMPLETED
As Of December 31, 1982
SOO-i
480
Q. 400
O
O
£5 30°
CD
z 200
LJ
>
1
O
100-
~r
2
QUARTERS
Legend
SIGNIFICANT VIOLATORS
INSPECTIONS COMPLETED
-EOY TARGET
-39-
-------
ENFORC FJ ME NT
TSCA COMPLIANCE MONITORING INSPECTIONS
o COLLECTIVELY, THE REGIONS WERE SLIGHTLY BEHIND SCHEDULE, COMPLETING
20% OF THE END-OF-YEAR TARGET IN THE FIRST QUARTER.
o OF 391 INSPECTIONS COMPLETED, 378 WERE FOR PCB COMPLIANCE MONITORING,
EFFORTS IN THE SECOND QUARTER SHOULD FOCUS ON CFC, ASBESTOS AND
DIOXIN INSPECTIONS AS WELL.
O CONSENT AGREEMENTS AND FINAL ORDERS WERE SIGNED TO RETURN 5 OF
50 SIGNIFICANT VIOLATORS TO COMPLIANCE. SETTLEMENT DISCUSSIONS
ARE ONGOING FOR THE 45 REMAINING VIOLATORS.
-40-
-------
ro
00
ui
V}
O
TSCA COMPLIANCE MONITORING INSPECTIONS
AND ENFORCEMENT ACTIONS
CUMULATIVE NUMBER COMPLETED
As Of December 31, 1982
Q
a.
o
o
: NUMBER
CUMULATIVE
1800-
1600-
1400-
1200-
1000-
800-
600-
400-
200-
0-
^i
_1
^^i i i i
1234
QUARTERS
Legend
•1 SIGNIFICANT VIOLATORS
EZJ INSPECTIONS COMPLETED
EOY TARGET
-41-
-------
ENFORCEMENT
REGIONAL TSCA COMPLIANCE MONITORING INSPECTIONS
o MOST REGIONS MADE ONLY SLIGHT PROGRESS THIS QUARTER TOWARD ACHIEVING
THEIR END-OF-YEAR TARGETS. PROGRESS IN THIS AREA SHOULD BE MONITORED
CLOSELY IN THE SECOND QUARTER.
o REGION VIII WAS THE EXCEPTION, COMPLETING 142 INSPECTIONS. i
REGION VIII HAS ALREADY EXCEEDED ITS END-OF-YEAR TARGET BY 45%.
-42-
-------
K)
00
Ul
V)
o
REGIONAL TSCA COMPLIANCE MONITORING INSPECTIONS
As Of December 31, 1982
500n
V VI VII
REGIONS
VIII IX X
Legend
ACTUAL
END-OF-YEAR TARGET
-43-
-------
XSHI.-I anx NI ana SSIXJAIXDV ON 3H3M
3M3HX 'ainaaHDs NO aswo ox aaxxiwgns auaM ee AJ uoa saNOxsaiiw vo
ddO
aHDS NO sxNawaansvaw SWIS/OD ao
NoixvcinvA ^aoxvMoeviMaxNi aoa HO.-i Nvid xoaroHd vo v ciaxaidwoo sxo o
s NO
xianv vo ?8 AA 3Fij. wotf.ii SNOIXDV 3AixoaHHoo ivNi.-i aaxaidwoo sxo o
vxva QNV Noisaci ivxNawiaadxa QNV HVDIXSTXVXS do sva^v anx
NI yanvai v sv aaziNDODan SVM sxo -yaxnvnO XSHIH aHX NI aaxonoNOD
SVM 3DI.4JO (vO) aoNvanssv Axnvno sxo anx ao xianv QMO HVONNV SHX o
sxo
S3IXIAIX3V 3DNV»nSSV AXnVnO SXdO H3XHVnO XSilld
Vcia .30 AxnvnO anx
-------
OFFICE OF WATER
TABLE Ob1 CONTENTS
GOAL PAGE
DELEGATION TO STATES 47
DEVELOPING AND REVIEWING CRITICAL REGULATIONS 53
MEETING PROGRAM COMMITMENTS 56
ENFORCEMENT 66
-45-
-------
DELEGATION TO STATES
CONSTRUCTION GRANTS AND NPDES PROGRAMS
o PROGRESS IN DELEGATING THE CONSTRUCTION GRANTS AND NPDES PROGRAMS
WILL BE REPORTED SEMI-ANNUALLY FROM NOW ON. THE NEXT REPORT WILL
BE MADE AT THE CLOSE OF THE SECOND QUARTER.
-47-
-------
_TO .STATES
STATE UNDERGROUND INJECTION CONTROL PROGRAMS
o FY 1982 DELEGATION SCHEDULES WERE RENEGOTIATED WITH THE REGIONS:
- TWENTY-TWO STATES ARE TARGETED FOR FULL PRIMACY IN FY 1983.
- THREE STATES ARE TARGETED FOR PARTIAL PROGRAM APPROVAL IN FY 1983
- THIRTEEN STATES ARE TARGETED FOR FULL PRIMACY IN FY 1984.
EIGHTEEN STATES ARE SCHEDULED FOR DIRECT IMPLEMENTATION.
O THE VIRGIN ISLANDS, PUERTO RICO, DISTRICT OF COLUMBIA, OSAGE
INDIAN RESERVATION, GUAM, AMERICAN SAMOA, NORTHERN MARIANA
ISLANDS AND TRUST TERRITORY OF THE PACIFIC ARE TREATED AS STATES.
O MASSACHUSETTS ASSUMED FULL PRIMACY AND UTAH AND WYOMING RECEIVED
PARTIAL PROGRAM APPROVAL DURING THE FIRST QUARTER. FIVE STATES
NOW HAVE FULL PRIMACY.
O OREGON WAS REMOVED FROM THE LIST OF STATES REQUIRING DIRECT
IMPLEMENTATION AND IS SCHEDULED FOR FULL PRIMACY IN FY 1983.
o STATE UIC PROGRAMS APPROVED PRIOR TO FY 1983 COVERED MORE THAN 25%
OF THE MAY 18, 1982 NATIONAL INVENTORY OF INJECTION WELLS. STATE
UIC PROGRAMS APPROVED IN THE FIRST QUARTER FY 1983 COVER 15% OF THE
NATIONAL INVENTORY OF INJECTION WELLS FOR A CURRENT TOTAL OF 40% OF
ALL INJECTION WELLS. (NOTE: THE NATIONAL INVENTORY IS PERIODICALLY
UPDATED AND VERIFIED.)
o STATE UIC PROGRAMS SCHEDULED FOR APPROVAL BY THE END OF FY 1983
WILL COVER ABOUT 80% OF THE MAY 18, 1982 NATIONAL INVENTORY OF
INJECTION WELLS.
-48-
-------
to
STATE UIC PROGRAMS APPROVED
As Of December 31, 1982
IV V VI VII VIII IX
REGIONS
Legend
BB FULL PRIMflCY 5
HZ CLRSS 1, III, IV, V WELLS- I
LZ1 CLRSS II WELLS \
CD NO flSSUMED flCTIVITIES 30
KB FEDERRL PROGRRM REQUIRED— 18
A Federal program is required in those States
that have not applied for primacy.
*• TARGETED TOR FULL PRIMACY
IN FY 1983
• TARGETED FOR PARTIAL
PROGRAM APPROVAL IN FY-B3
TARGETED FOR FULL PRIMACY
IN FY 1984
-49-
-------
DELEGATION TO STATES
UNDERGRqUNID INJECTIiOJN__CQNTRO1L^_PJ1OGRAM
o THE FOLLOWING DIRECT IMPLEMENTATION SCHEDULES WERE NEGOTIATED WITH
THE REGIONAL ADMINISTRATORS DURING THE FIRST QUARTER:
- TWELVE STATES ARE SCHEDULED FOR PROPOSED RULES IN FY 1983.
- SIX STATES ARE SCHEDULED FOR DRAFT RULES IN FY 1983.
- ALL EIGHTEEN STATES ARE SCHEDULED FOR FINAL RULES IN FY 1984.
o VIRGINIA, COLORADO, AMERICAN SAMOA, THE NORTHERN MARIANA ISLANDS,
THE TRUST TERRITORY OF THE PACIFIC AND THE OSAGE INDIAN RESERVATION
WERE ADDED TO THE LIST OF STATES REQUIRING DIRECT IMPLEMENTATION.
o DRAFT RULES WERE DEVELOPED FOR FOUR STATES DURING THE FIRST QUARTER.
o PROGRAMS TARGETED FOR DIRECT IMPLEMENTATION WILL COVER ABOUT 20% OF
THE MAY 18, 1982 NATIONAL INVENTORY OF PERMITTED WELLS.
-50-
-------
UIC DIRECT IMPLEMENTATION
As Of December 31, 1982
B-i
7-
6-
5-
•*C
v)
3~
2-
1-
0J
O
£ DC MN
y VA TN MI ;NE>
g r__, _ ^ ^
O NY PA KY IN foS' /IA' -
T* • «* »* »• /»*/ '/*«/, '
'/ / '/ / '
i
Legend
M FINnL REGULflTIONS 0
E3 PROPOSED REGULATIONS - 0
C3 DRRFT REGULATIONS 4
aun PDnnt IPTC — — — i c
rfu rnUUULlb ^~ ~ ID
n
NM
CO AS
•• •
IJTX w\/ Uf ** TARGETED FOR PROPOSED
••• •» . REGULATIONS IN FY 1983
'// .
\ li m n!f w wC VM v/!» iv 0 • TARGETED FOR DRAFT
1 II HI IV V VI VII VIII IX X REGULATIONS IN FY 1983
REGIONS
CLASS II WILL BE DROPPED TOR NEBRASKA IF
g STATE ACHIEVES PRIMACY.
>
0
THE;
-51-
-------
DEVELOPING AND REVIEWING CRITICAL REGULATIONS
ITEM
STATUS
GENERAL PRETREATMENT
REGULATIONS
NPRM FOR REMOVAL CREDITS PUBLISHED
ON SCHEDULE, 9/28/82.
BEST CONVENTIONAL
TECHNOLOGY REGULATIONS
NPRM PUBLISHED 12/29/82. (TARGET;
6/30/82; DELAY ATTRIBUTED TO OMB).
CONSTRUCTION GRANTS
REGULATIONS
FINAL RULE ENTERED RED BORDER
REVIEW 12/8/82 (TARGET; 10/30/82).
WATER QUALITY STANDARDS
REGULATIONS
NPRM PUBLISHED 10/29/82 (TARGET;
6/15/82; DELAY IS ATTRIBUTED TO OMB)
-53-
-------
DE:VELO1PING _AND_RKVIJSWING J<§5iULAT_IONS
EFFLUENT GUIDELINES
o EIGHT EFFLUENT GUIDELINES WERE PROMULGATED ON__SCH§DULE DURING THE
FIRST QUARTER:
- COAL MINING
- COIL COATING (PHASE I)
- LEATHER TANNING AND FINISHING
- ORE MINING
- PETROLEUM REFINING
- PORCELAIN ENAMELING
PULP AND PAPER
STEAM-ELECTRIC
O TWELVE OF THE TWENTY-NINE GUIDELINES INCLUDED IN THE COURT-ORDERED
SCHEDULE ARE NOW FINAL AND EFFECTIVE.
O SIX EFFLUENT GUIDELINES WERE PROPOSED ON SCHEDULE DURING THE FIRST
QUARTER (FIRST FOUR ARE TARGETED FOR PROMULGATION IN FY 1983 AND
THE LAST TWO IN FY 1984):
- ALUMINUM FORMING
- BATTERY MANUFACTURING
- COPPER FORMING
- FOUNDRIES
- PESTICIDES
- PHARMACEUTICALS
o ALL OTHER EFFLUENT GUIDELINES ARE ON SCHEDULE.
o BY SEPTEMBER 31, 1983, THE SCHEDULE CALLS FOR A TOTAL OF:
- EIGHTEEN FINAL EFFLUENT GUIDELINES.
- TEN PROPOSED EFFLUENT GUIDELINES.
-54-
-------
GU10KUNE3 HOii:f*nK run IY 'ID MHHXCAI. win
A3 OF DI-XTJIIHIH .11, I9H2
Intluolry
Aclhcs I ve/Sea lanls
Alunlniin Forming
Battery Manufacturing
Coll Coating (Can
Making Soyniont)
Copjwr Forming
Electrical t> Electronic
(Phaso I)
Electrical 6. Electronic
(Hiaoo II)
Inoryanlc Clieinlcala
(Pliase II)
Metal Finishing
NonCerrous fletals
FOrralng
Nooforrouo Metala
(Phaso 1)
Nonforroua Motalo
(Plwauo II)
Otynnlc & Plastics Cliom
IHjatlcldea
Pliatinaceutlcala
Plastics HoliUng and
Forming
liMI
IP
Uate)
?/H2
)/0 2
1/02
'02
>/02
'02
0/02
6/U2
FY 'DJ
0 N I) J I4 M A H J J A S
•
*
•
•
*
•
• ^
•
•
»
•
•
•
K '04
0 N 1)
•
•
•
•
•
•
* Proposal
* 1'ioimjlyatlon
tu! lit Is Is the
sclicdulo
t Iwi Court oil
Aiiyint 25. 19U2.
-------
MEETING PROGRAM COMMITMENTS
CONSTRUCTION GRANTS OBLIGATIONS
o NATIONALLY, ACTUAL OBLIGATIONS FOR THE FIRST QUARTER WERE ONLY 54%
OF THE PLANNED TARGET.
o REGIONS VI AND VII EXCEEDED THEIR OBLIGATION TARGETS BY 40% AND 10%
RESPECTIVELY.
o REGIONS III, IV, V AND VIII ACHIEVED LESS THAN 50% OF THEIR
OBLIGATION TARGETS.
o THE OFFICE OF WATER IS IN THE PROCESS OF IDENTIFYING THE REASONS
FOR THE SHORTFALL. THE REGIONS EXPECT TO BE ON TARGET BY THE END
OF THE SECOND QUARTER.
CONSTRUCTION GRANTS OUTLAYS
o NATIONALLY, ACTUAL OUTLAYS FOR THE FIRST QUARTER WERE 98% OF
THE PLANNED TARGET.
o ALL REGIONS WERE WITHIN +5% OF THEIR TARGETS EXCEPT FOR REGIONS VI,
VIII AND X WHICH ACHIEVED ABOUT 90% OF THEIR TARGETS.
-56-
-------
CONSTRUCTION GRANT PROGRAM OBLIGATIONS AND OUTLAYS
As Of December 31, 1982
;
OBLIGATIONS OUTLAYS
4000-
3500-
2 3000-
JO
= 2500-
-------
MEETING PROGRAM COMMITMENTS
CONSTRUCTION GRANTS COMPLETIONS AND CLOSEOUTS
o THE OFFICE OF WATER ACHIEVED 76% OF ITS FIRST QUARTER TARGET FOR
PHYSICAL COMPLETIONS. REGION VI COMPLETED 169% OF ITS TARGET WHILE
REGIONS I, III, V, AND X ACHIEVED LESS THAN 60% OF THEIR TARGETS.
O IN THE AREA OF ADMINISTRATIVE COMPLETIONS, THE OFFICE OF WATER
ACHIEVED 94% OF ITS FIRST QUARTER TARGET. REGIONS V, VI AND X
COMPLETED 118%, 213% AND 273% OF THEIR RESPECTIVE TARGETS. REGIONS
II, III, VII AND VIII ACHIEVED LESS THAN 60% OF THEIR TARGETS.
o THE OFFICE OF WATER ACHIEVED 74% OF ITS FIRST QUARTER TARGET FOR
PROJECT CLOSEOUTS. REGIONS I, III AND X COMPLETED 150%, 125% AND
200% OF THEIR TARGETS RESPECTIVELY, WHILE REGIONS V, VII AND VIII
COMPLETED ONLY 15%, 25% AND 17% RESPECTIVELY.
-58-
-------
CONSTRUCTION GRANT COMPLETIONS/CLOSEOUTS
PROJECTS COMPLETED
As Of December 31, 1982
Physical
Completions
Administrative
Completions
Project
Closeouts
8
Ul
3
o:
a.
LL.
O
O
ISOO-i
1250-
1000-
750-
500-
250-
0-
00
Ul
2
O
1234
QUARTERS
DIFFERENT SCALE
1500-1
1250-
1000-
750-
500-
250-
0
I
1234
QUARTERS
Legend
• ACTUAL
K2 TAKQET
1000
750
500
250
0
1234
QUARTERS
-59-
-------
MEETING PROGRAM COMMITMENTS
NPDES REPERMITTING
o EPA'S NPDES REPERMITTING BACKLOG INCLUDES APPROXIMATELY 1,175 MAJOR
PERMITS AND 9,000 MINOR PERMITS.
o THE BACKLOG IS LARGELY THE RESULT OF PAST DELAYS IN ISSUING EFFLUENT
GUIDELINES.
o OF THE 1,175 BACKLOGGED MAJOR PERMITS, 20 ARE FOR FEDERAL FACILITIES,
260 ARE FOR MUNICIPALITIES AND 895 ARE FOR INDUSTRIAL FACILITIES.
o THE OFFICE OF WATER IS CURRENTLY GIVING PRIORITY TO REDUCING THE
BACKLOG OF MAJOR INDUSTRIAL PERMITS.
O THE BACKLOG OF MAJOR INDUSTRIAL PERMITS VARIES SIGNIFICANTLY FROM
REGION TO REGION DEPENDING UPON THE DEGREE OF DELEGATION OF THE
NPDES PROGRAM. THE LARGEST BACKLOGS ARE IN THE INDUSTRIAL REGIONS
WHICH HAVE NOT COMPLETED DELEGATION (I.E., REGIONS I, IV, VI AND X).
O TWO HUNDRED AND SEVENTY-SIX INDUSTRIAL PERMITS (INCLUDING SOME MINORS)
HAVE BEEN TARGETED FOR REISSUANCE IN FY 1903.
o THREE INDUSTRIAL PERMITS WERE TARGETED FOR REISSUANCE IN THE FIRST
QUARTER. TWENTY-THREE (INCLUDING SOME MINORS) WERE REISSUED.
o REGION VIII PERFORMED PARTICULARLY WELL BY REISSUING TEN INDUSTRIAL
PERMITS OVER ITS TARGET. IN FACT, THE REGION MET 67% OF ITS END-OF-YEAR
TARGET BY THE END OF THE FIRST QUARTER.
-60-
-------
K)
00
UJ
(rt
300-!
250-
200-
QL
Q_
O
•
O
100-
50
REDUCING REPERMITTING BACKLOG
As Of December 31, 1982
PERMITS TO BE REISSUED
1 2 3
QUARTERS
REDUCTION IN MAJOR INDUSTRIAL
PERMIT BACKLOG
1000
750-
500-
250-
• TARGET, (
• ACTUALS
1 2 3
QUARTERS
-61-
-------
PROGRAM COMMITME NTS
NPDES PERMIT PROCESSING FOR NEW FACILITIES
o DURING THE FIRST QUARTER, THE OFFICE OF WATER REPORTED A NATIONAL
AVERAGE OF THREE MONTHS FOR PROCESSING AN NPDES NEW FACILITY PERMIT
FROM RECEIPT OF A COMPLETE APPLICATION TO PERMIT ISSUANCE. THIS IS
SIGNIFICANTLY LESS THAN THE AGENCY TARGET OF SIX MONTHS AND IS AN
OUTSTANDING ACHIEVEMENT.
o THE ANOMALY IN REGION VIII IS DUE TO THE REGION PROCESSING ONE OF
ITS OLDER BACKLOGGED PERMITS.
-62-
-------
Z
o
00
ui
1
2
O
IB-,
12-
NPDES - NEW FACILITIES
Average Permit Processing Time
Complete Application To Final Action
As Of December 31, 1982
TARGET
II III IV V VI VII VIII IX X
REGIONS
NO. FINAL PERMIT ACTIONS :
2 0 0 218 - 4
1 0 0
NATIONAL AVERAGE TIME
6-
-------
MEETING PROGRAM COMMITMENTS
301(h) PERMITS
o THE ORDER DELEGATING 301 (h) WAIVER DECISIONS TO THE REGIONS WAS
SIGNED ON DECEMBER 30, 1982.
o THE OFFICE OF WATER RECEIVED SEVENTY 301(h) APPLICATIONS PRIOR TO
THE ORIGINAL SEPTEMBER 13, 1979 DEADLINE. NO FINAL PERMITS HAVE
BEEN ISSUED SINCE THAT TIME.
ELEVEN TENTATIVE 301(h) WAIVER DECISIONS WERE MADE
DURING THE FIRST QUARTER, BRINGING THE TOTAL OF WAIVER '
DECISIONS ISSUED TO DATE TO TWENTY-FOUR.
FORTY-SIX APPLICATIONS ARE STILL AWAITING TENTATIVE
DECISION (FORTY OF THOSE DECISIONS ARE TO BE DELEGATED
TO THE REGIONS; SIX WILL BE MADE IN HEADQUARTERS).
- THE REGIONS WILL DEVELOP THE DRAFT AND FINAL PERMITS.
O NINE DRAFT PERMITS ARE SCHEDULED TO BE COMPLETED IN FY 1983, BRINGING
THE TOTAL OF DRAFT PERMITS ISSUED SINCE SEPTEMBER 13, 1979 TO 15.
O ONE DRAFT PERMIT WAS SCHEDULED TO BE ISSUED BY REGION IX DURING THE
FIRST QUARTER. IT WAS NOT ISSUED.
o ELEVEN FINAL PERMITS (OUT OF SEVENTY APPLICATIONS) ARE SCHEDULED TO BE
COMPLETED BY THE END OF FY 1983.
O ONE HUNDRED AND FORTY-FOUR NEW APPLICATIONS HAVE BEEN RECEIVED IN
RESPONSE TO THE NEW DECEMBER 12, 1982 APPLICATION DEADLINE.
-------
K)
00
UJ
(O
2
o
30-i
25-
20-
15-
10-
0-
301(h) PERMITS
As Of December 31, 1982
PERMITS TO BE ISSUED
III
REGIONS
BACKLOG REDUCTION
70
60-
50-
40-
30-
20-
10-
IX
Legend
•M FINAL PERMITS COMPLETED
O-FINAL PERMITS TARGETED FOR FY 1983
CD PERMIT BACKLOG
1 2 3
QUARTERS
ACTUAL
TARGET
I
4
-65-
-------
EN_FOR C EMENT
o THE DRAFT FY 1983 MUNICIPAL COMPLIANCE IMPROVEMENT POLICY WAS ISSUED
ON TIME.
o THE REGIONS ARE MAKING USE OF THE NEW AGENCY-WIDE DEFINITION OF
SIGNIFICANT NON-COMPLIANCE FOR DETERMINING COMPLIANCE RATES.
o RESPONSIBILITY FOR TRACKING POTW COMPLIANCE RATES WAS TRANSFERRED
FROM THE OFFICE OF WATER PROGRAM OPERATIONS TO THE OFFICE OF WATER
ENFORCEMENT AND PERMITS.
O AS A RESULT OF THE USE OF THE NEW DEFINITION AND THE CHANGES IN
TRACKING RESPONSIBILITIES, THE UNIVERSE OF INDUSTRIAL AND MUNICIPAL
SOURCES TRACKED FOR THE FIRST QUARTER DIFFERS FROM THAT TRACKED IN
FY 1982 AND FOR WHICH FY 1983 TARGETS WERE DEVELOPED. THE DATA
PROVIDED BY THE OFFICE OF WATER CANNOT, THEREFORE, BE USED THIS
QUARTER TO IDENTIFY TRENDS OR PROGRESS AGAINST TARGETS.
o THE OFFICE OF WATER WAS UNABLE TO PROVIDE INFORMATION ON THE
ADMINISTRATIVE ORDERS AND NOTICES OF VIOLATION RESOLVED. THE
ENFORCEMENT ACTION MODULE HAS NOT YET BEEN ADDED TO THE PERMIT
COMPLIANCE SYSTEM. THE PROGRAM NOW ESTIMATES THAT IT WILL TAKE
UNTIL THE THIRD QUARTER BEFORE THEY CAN PROVIDE THIS INFORMATION.
-66-
-------
100-1
75-
50-
25-
0
00
PERCENT OF SOURCES IN COMPLIANCE
As Of December 31, 1982
Major POTWs
~i r
2 3
Quarters
~r~
4
Number of Sources Measured: 2,435
0
Q_
100-1
75-
50-
25
0
Major Industrials
1234
Quarters
Number of Sources Measured: 3,106
-67-
-------
OFFICE OF SOLID WASTE AND EMERGENCY RESPONSE
TABLE OF CONTENTS
GOAL PAGE
DELEGATION TO STATES 70
MEETING PROGRAM COMMITMENTS 75
ENFORCEMENT 82
-69-
-------
DELEGATION TO STATES
RCRA-C PHASE II STATE AUTHORIZATION
o THE TARGET FOR FY 83 IS TO HAVE TWENTY-THREE STATES AUTHORIZED
FOR PHASE II. VERMONT, SOUTH CAROLINA AND OKLAHOMA OBTAINED PHASE
II AUTHORIZATION DURING FIRST QUARTER, BRINGING THE TOTAL TO EIGHT.
o REGIONS IV AND VI ARE FURTHEST ALONG IN DELEGATING PHASE II.
O KENTUCKY WAS NOT AUTHORIZED IN FIRST QUARTER AS TARGETED BECAUSE ,
FURTHER CLARIFICATION FROM THE STATE'S ATTORNEY GENERAL WAS
REQUIRED. AUTHORIZATION IS NOW ANTICIPATED TO OCCUR DURING SECOND
QUARTER.
O THIRTEEN STATES—PUERTO RICO, VIRGIN ISLANDS, DELAWARE, ILLINOIS,
INDIANA, MICHIGAN, MINNESOTA, OHIO, WISCONSIN, IOWA, KANSAS, COLORADO
AND SOUTH DAKOTA—PLAN TO GO DIRECTLY TO FINAL AUTHORIZATION.
WYOMING DOES NOT INTEND TO ADOPT THE RCRA PROGRAM.
-70-
-------
K>
CO
Ul
(/)
3E
O
DELEGATION STATUS OF RCRA - PHASE II
As Of December 31, 1982
v vi
REGIONS
VII VIII IX
AUTHORIZED 8
DRAFT STAGE 16
NONE 29
TOTAL 53
IA
NE
•
•r S~ s- S^*
IUQZ
?KS|
'Ws
WY
UT
SD
ND
CO
MT
**
HI
AZ
NV
*
YS-SS-S,
;CA?
'_,**•!•
%*&.
ID
AK
••
>^><.
= WA;
^
§OR;
?**J^
^%^
** TARGETED FOR AUTHORIZATION
IN FY 1983
* TARGETED FOR DRAFT STAGE
IN FY 1983
Legend
NONE
DRAFT STAGE
Ml AUTHORIZED
-71-
-------
DELEGATION TO STATES
I STATE AUTHORIZATION
o THE TARGET KOR FY 83 IS TO HAVE 40 STATES AUTHORIZED FOR PHASE I.
PUERTO RICO OBTAINED PHASE I AUTHORIZATION DURING THE FIRST QUARTER,
BRINGING THE TOTAL TO 35.
o NEW JERSEY DID NOT SUBMIT ITS FINAL APPLICATION UNTIL DECEMBER 30,
1982. AUTHORIZATION, ORIGINALLY TARGETED FOR FIRST QUARTER, IS NOW
ANTICIPATED TO OCCUR DURING SECOND QUARTER.
O NEW YORK'S APPLICATION IS ON HOLD DUE TO ELECTION OF A NEW
GOVERNOR AND APPOINTMENT OF A NEW COMMISSIONER FOR THE DEPARTMENT
OF ENVIRONMENTAL CONSERVATION.
O FIVE STATES — VIRGIN ISLANDS, MICHIGAN, MINNESOTA, COLORADO AND
SOUTH DAKOTA — PLAN TO GO DIRECTLY TO FINAL AUTHORIZATION.
o WYOMING DOES NOT INTEND TO ADOPT THE RCRA PROGRAM; REGION VIII
WILL IMPLEMENT IT.
-72-
-------
K)
§
DELEGATION STATUS OF RCRA - PHASE I
As Of December 31, 1982
I II III IV V VI VII VIII IX X
REGIONS
AUTHORIZED 35
DRAFT STAGE 10
NONE 9
TOTAL
53
•• TARGETED TOR AUTHORIZATION
IN FY 1983
• TARGETED TOR DRAFT STAGE
IN FY 1983
Legend
a NONE
E3 DRAFT STAGE
na AUTHORIZED
-73-
-------
MEETING PROGRAM COMMITMENTS
0 ISSUED THE PROPOSED SUPERFUND NATIONAL PRIORITY LIST OF 418 SITES
ON DECEMBER 20, 1982. THE SITES ARE RANKED BY DEGREE OP POTENTIAL
THREAT TO HEALTH AND THE ENVIRONMENT. WHEN FINAL, THE LIST WILL
REPLACE THE CURRENT INTERIM PRIORITY LIST OF 160 SITES AND WILL BE
REVISED ON A QUARTERLY BASIS.
o IT APPEARS THAT VERY LITTLE RCRA PERMITTING ACTIVITY OCCURRED DURING
FIRST QUARTER.
~ EXISTING FACILITIES (ACTIVITY SINCE INCEPTION OF PROGRAM IN FY 82).
— 701 STORAGE AND TREATMENT PERMITS HAVE BEEN CALLED TO DATE.
EPA IS IN PROCESS OF REVIEWING 342 APPLICATIONS.
— 84 OUT OF 179 INCINERATION PERMITS HAVE BEEN CALLED TO DATE.
EPA IS IN PROCESS OF REVIEWING £1 APPLICATIONS. WE HAVE
ISSUED ONE INCINERATION PERMIT.
— LAND DISPOSAL REGULATIONS BECAME EFFECTIVE ON JANUARY 26, 1983.
APPLICATIONS FOR EXISTING LAND DISPOSAL FACILITIES CAN NOW BE
CALLED IN. OSWER PLANS TO CALL IN 231 APPLICATIONS, CONCEN-
TRATING ON THE LARGEST SITES AND THE ONES WITH THE GREATEST
POTENTIAL PROBLEMS FIRST.
- NEW FACILITIES (ACTIVITY SINCE INCEPTION OF PROGRAM IN FY 82).
— TWENTY-THREE APPLICATIONS FOR STORAGE AND TREATMENT FACILITIES
HAVE BEEN RECEIVED. THREE PERMITS HAVE BEEN ISSUED.
— FIVE APPLICATIONS FOR INCINERATION FACILITIES HAVE BEEN RECEIVED.
— SIX APPLICATIONS FOR DISPOSAL FACILITIES HAVE BEEN RECEIVED.
ONE PERMIT HAS BEEN ISSUED.
-75-
-------
MEETING PROGRAM COMMITMENTS
SUPERFUND REMEDIAL ACTION MASTER PLANS
o REMEDIAL ACTION MASTER PLANS (RAMPS) SUMMARIZE AVAILABLE INFORMATION
ON SUPERFUND SITES AND PROPOSE STRATEGIES FOR UNDERTAKING NECESSARY
REMEDIAL WORK.
O FORTY-FIVE RAMPS WERE INITIATED FOR NATIONAL PRIORITY LIST SITES,
EXCEEDING THE FIRST QUARTER TARGET BY THIRTY-FIVE.
o AS PROJECTED, TEN RAMPS WERE COMPLETED DURING FIRST QUARTER.
-76-
-------
§
Ul
(A
L
FY 83 SUPERFUND
REMEDIAL ACTION MASTER PLANS
As Of December 31, 1982
INITIATED
1 2 3
QUARTER
75-1
50-
25
• PROJECTED
iiiiiiiiiiin in
• ACTUALS
COMPLETED
1 2
QUARTER
-77-
-------
MEETING PROGRAM COMMITMENTS
SUPERFUND SITE REMEDIAL ACTIVITIES
o REMEDIAL WORK WAS UNDERWAY AT 62 SITES AT THE END OF THE FIRST
QUARTER.
o MAJOR IMPLEMENTATION PROJECTS COSTING APPROXIMATELY $7.4 MILLION
WERE COMPLETED AT FOUR PRIORITY SITES (E. G., CONSTRUCTION OF A
SLURRY WALL AND INSTALLATION OF A CLAY CAP WERE COMPLETED AT
THE NASHUA, NEW HAMPSHIRE SITE).
O FIVE STATE COOPERATIVE AGREEMENTS WERE AWARDED DURING THE FIRST
QUARTER. THESE AGREEMENTS GIVE THE STATES THE PROJECT LEAD FOR
93.2% OF THE SUPERFUND REMEDIAL DOLLARS OBLIGATED DURING FIRST
QUARTER.
O $110 MILLION IS TARGETED TO BE OBLIGATED FOR REMEDIAL ACTIVITIES
DURING FY 83 (I.E., REMEDIAL INVESTIGATIONS/FEASIBILITY STUDIES,
ENGINEERING DESIGNS AND IMPLEMENTATION).
o DURING FIRST QUARTER $8.3 MILLION WAS ALLOCATED FOR REMEDIAL
ACTIVITIES.
o OF THE ABOVE TOTAL, $5.2 MILLION WAS OBLIGATED FOR:
- REMEDIAL INVESTIGATION/FEASIBILITY STUDIES (RI/FS) AT FOUR NEW
SITES. THE FIRST QUARTER TARGET CALLED FOR THE INITIATION OF 12
RI/FS. THIS PROGRAM SHORTFALL WILL REQUIRE EXPLICIT CORRECTIVE
, MEASURES FROM PROGRAM STAFF DURING THE SECOND QUARTER.
- ENGINEERING DESIGN AT ONE NEW SITE; AHEAD OF TARGET.
IMPLEMENTATION ACTIVITIES AT TWO NEW SITES; AHEAD OF TARGET.
-78-
-------
FY 83 SUPERFUND
SITE REMEDIAL ACTIVITIES INITIATED
As Of December 31, 1982
Remedial Investigations/ Engineering Remedial
Feasibility Studies Designs Actions
40-
ffi 30-
U. 20-
O
»
O 10-
Oi
C
* 30 -i
** *
»
•
S* 20-
/'
/^.A
0_j
20 -i
*
*
/' to-
*
..*
-A**
X**
Of "^f | | | \J if - - • -f | | |
)1234 01234 01234
QUARTERS QUARTERS QUARTERS
oo
A ACTUAL SITES - FUNDS OBL
3 ** DIFFERENT SCALE
o
-------
MEETING PROGRAM COMMITMENTS
SUPERFUND REMOVAL ACTIVITIES
o APPROXIMATELY $1.1 MILLION WAS OBLIGATED FOR REMOVAL ACTIVITIES
DURING THE FIRST QUARTER. THIS IS WITHIN APPROVED BUDGET LEVELS.
O ONE PLANNED REMOVAL ACTIVITY WAS INITIATED AND TWO WERE COMPLETED.
o TEN IMMEDIATE REMOVAL ACTIONS WERE INITIATED AND EIGHTEEN ACTIONS
WERE COMPLETED.
O EPA UNDERTOOK 95 OTHER EPA ON-SCENE RESPONSE ACTIVITIES, PARTICULARLY
OVERSIGHT, COORDINATION AND TECHNICAL ASSISTANCE FOR REMOVAL OPERATIONS
CONDUCTED BY RESPONSIBLE PARTIES OR STATE/LOCAL AUTHORITIES.
-80-
-------
15-
10-
UJ
m
ui
tn
3
O
SUPERFUND REMOVAL ACTIVITIES FOR FY 83
As Of December 31, 1982
PLANNED REMOVALS
( INITIATED )
1 2 3
QUARTER
15-1
10-
5-
PUNNED REMOVALS
( COMPLETED )
1 2
QUARTER
• BUDG ETED. RESPONSE CAPACITY
• ACTUALS
-HI-
-------
ENFORCEMENT
SUPERFUND ENFORCEMENT ACTIVITY
o DURING FIRST QUARTER, 316 NOTICE LETTERS WERE ISSUED FOR 24 SITES.
o NEGOTIATIONS ARE UNDERWAY WITH RESPONSIBLE PARTIES AT 68 SITES.
O DURING FIRST QUARTER, 113 ADMINISTRATIVE ORDERS WERE ISSUED. ONE
HUNDRED AND TWELVE OF THE ORDERS WERE ISSUED ON CONSENT TO RESPONSIBLE
PARTIES AT THE CHEM-DYNE, OHIO SITE.
O EPA OBTAINED PRIVATE PARTY CLEANUPS WORTH APPROXIMATELY $35.5 MILLION
AT 3 SITES: GRATIOT COUNTY, MICHIGAN, SEYMOUR, INDIANA AND SOLVENTS
RECOVERY SERVICE, CONNECTICUT.
o EPA NEGOTIATED A COST RECOVERY ACTION WORTH $14 MILLION WITH VELSICOL
CORPORATION FOR ITS GRATIOT COUNTY, MICHIGAN SITE. OF THE $14
MILLION, $13.5 MILLION WENT TO THE STATE OF MICHIGAN AND $500 THOUSAND
WENT TO EPA.
-------
SUPERFUND ENFORCEMENT ACTIVITY FOR FY 83
As Of December 31, 1982
160-1
120-
LJ
CD
80-
40-
0
CO
u
in
o
68
24
113
-83-
-------
ENFORCEMENT
RCRA ENFORCEMENT ACTIVITY
o DATA WAS NOT PROVIDED BY THE PROGRAM FOR COMPLIANCE MONITORING
INSPECTIONS, MAJOR FACILITIES WITH CLASS I VIOLATIONS DETECTED, AND
COMPLIANCE ORDERS ISSUED FOR MAJOR FACILITIES WITH CLASS I VIOLATIONS
DURING FIRST QUARTER.
o PROBLEMS WITH THE HAZARDOUS WASTE DATA MANAGEMENT SYSTEM (WHICH IS
TO PROVIDE THE INFORMATION) ARE EXPECTED TO BE RESOLVED PRIOR TO
PREPARATION OF THE SECOND QUARTER REPORT.
o QUARTERLY INSPECTION TARGETS AND THE LIST OF "MAJOR" RCRA FACILITIES
ARE STILL BEING NEGOTIATED BETWEEN OSWER AND THE REGIONS. THE
i INSPECTION TARGETS AND LIST OF MAJORS WILL BE AVAILABLE BY SECOND
QUARTER.
-84-
-------
RCRA ENFORCEMENT ACTIVITY FOR FY 1983
As Of December 31, 1982
DATA UNAVAILABLE
CO
Ul
V)
o
-us-
-------
OFFICE OF ADMINISTRATION
DEVELOPING AND REVIEWING CRITICAL REGULATIONS
ITEM
STATUS
o GRANT REGULATIONS
- INTERGOVERNMENTAL REVIEW OF FEDERAL SUBMITTED TO OMB AFTER
PROGRAMS (40 CFR, PART 29) MINOR DELAY.
GENERAL REGULATIONS FOR ASSISTANCE
PROGRAMS (40 CFR, PART 30)
REVISED SCHEDULE REFLECTS
TWO MONTHS DELAY DUE TO
CONFLICT BETWEEN ORD AND
ODW OVER QUALITY ASSURANCE
REQUIREMENTS. THE ISSUE
HAS BEEN RESOLVED.
-87-
-------
OFFICE OF ADMINISTRATION
MEETING PROGRAM COMMITMENTS
ITEM
STATUS
FIRST TWO ELEMENTS OF OA'S COMPREHENSIVE
REVIEW OF EPA PROCUREMENT PROCEDURES AND
PROCESSES:
- PROCUREMENT DEVELOPMENT AND SOLICITATION
REPORTS WITH RECOMMENDATIONS
FOR IMPROVEMENTS WERE
SUBMITTED TO AA ON SCHEDULE.
- COMPUTER PROGRAM FOR MERIT PAY STATISTICAL
ANALYSIS
DEVELOPED ON SCHEDULE.
-88-
-------
OFFICE OF POLICY AND RESOURCE MANAGEMENT
MEETING PROGRAM COMMITMENTS
o WORKPLAN FOR ESTABLISHING WATER REGULATORY REFORM STRATEGY DEVELOPED
ON SCHEDULE.
o RED BORDER REVIEW TARGETS:
- MET 100% OF DEADLINES FOR PRELIMINARY ANALYSIS.
- MET 53% OF DEADLINES FOR POST-OMB CONCURRENCE.
- NEW OMB REQUIREMENT WILL PROBABLY ADD TO OPRM'S REVIEW TIME IN
FUTURE QUARTERS.
O DRAFT TECHNICAL GUIDANCE DOCUMENTS FOR GEOGRAPHIC PROGRAM INTEGRATION
COMPLETED ON SCHEDULE.
-89-
-------
MEETING PROGRAM COMMITMENTS (continued)
o COMPLETED ON SCHEDULE THE ANALYSIS OF HEALTH SCORING TECHNIQUES AND
EXPANDED METHODOLOGY FOR ASSESSING ENVIRONMENTAL EFFECTS.
O MONTHLY CURRENT YEAR ALLOWANCES WERE ISSUED TO ALLOWANCE HOLDERS
WITH ONLY MINOR DELAY.
o REVIEWS OF REPORTING F3URDEN IMPOSED BY EPA REGULATIONS ARE 41/2
MONTHS BEHIND SCHEDULE.
o GUIDANCE ON PREPARATION AND USE OF ENVIRONMENTAL MANAGEMENT REPORTS
WAS ISSUED ON SCHEDULE.
-9U-
-------
OFFICE OF RESEARCH AND DEVELOPMENT
CLIENT
ALL PROGRAMS
IMPROVING THE QUALITY OF EPA SCIENCE
ITEM
REVIEW OF EXPLORATORY
RESEARCH CENTERS
STATUS
SCHEDULE REVISED AFTER
INITIAL REVIEW INDICATED
NEED FOR ADDITIONAL WORK.
(REVISED COMPLETION DATE:
MARCH 15, 1983)
ALL PROGRAMS
TECHNICAL GUIDELINES FOR
DATA QUALITY ASSURANCE
DRAFT ISSUED FOR AGENCY-
WIDE REVIEW ON SCHEDULE;
ANALYSIS AND TABULATION
OF METHOD PERFORMANCE
CHARACTERISTICS COMPLETED
ON SCHEDULE.
OPTS
OSWER
REPORT ON RESULTS OF
ACUTE TOX1C1TY TEST
VALIDATION.
POST-CLOSURE GROUNDWATER
MONITORING SYSTEM FOR
HAZARDOUS WASTE SITES.
COMPLETED ON SCHEDULE,
DEVELOPED AND PROVIDED
TO RCRA PROGRAM
ON SCHEDULE.
-------
OFFICE OF LEGAL AND ENFORCEMENT COUNSEL
TABLE OF CONTENTS
GOAL
PAGE
ENFORCEMENT
94
-93-
-------
ENFORCEMENT
STATUS OF CIVIL REFERRALS
o OLEC HAS REDUCED SIGNIFICANTLY THE AVERAGE PROCESSING TIME OF CIVIL
REFERRALS AT HEADQUARTERS. BY THE END OF FY 82, THE AVERAGE PROCESSING
TIME FOR CIVIL REFERRALS HAD BEEN REDUCED GRADUALLY TO 92 DAYS.
DURING THE FIRST QUARTER OF FY 83, THE PROCESSING TIME WAS 64 DAYS,
AND THE PROGRAM EXCEEDED ITS TARGET OF 90 DAYS.
o PROBLEMS THAT HAVE BEEN PLAGUING OLEC'S AUTOMATED DOCKET SYSTEM
WERE SUBSTANTIALLY CORRECTED DURING THE FIRST QUARTER. OLEC WILL
CONTINUE TO MAKE REFINEMENTS TO ITS SYSTEM DURING FY 83, ENSURING
THAT REPORTS ON NUMBER AND STATUS OF CIVIL ACTIONS ARE CONSISTENT
AND ACCURATE.
o OF THE 330 CIVIL ACTIONS PENDING AT THE END OF THE FIRST QUARTER,
ROUGHLY 12% WERE PENDING AT EPA HEADQUARTERS.
o THIRTY-FOUR CIVIL ACTIONS WERE RESOLVED DURING THE FIRST QUARTER:
10 ACTIONS WERE SETTLED
- 2 ACTIONS WERE DISMISSED BY COURT
- 2 ACTIONS WERE WITHDRAWN BY REGION
- 20 ACTIONS WERE DECLINED BY HEADQUARTERS, DOJ, OR U. S. ATTORNEY
-94-
-------
20-i
"§ 10
D
0
S-
Ul
(/»
2
O
CIVIL ENFORCEMENT CASES
Pending As Of December 31, 1982
r|Q
1
CO
O
Dept of Justice / US Attv
70-i
No. Pending: 40
Average Time ,
Pending: 64 days 3D -
0
60n
30-
No. Pending: 155
A W HW T/F
Courts
No. Pending: 135
A W HW
-95-
-------
ENFORCEMENT
PROCESSING OF LITIGATION ACTIONS
o THERE WERE 19 NEW CIVIL ACTIONS AND 3 NEW CRIMINAL ACTIONS REFERRED
TO HEADQUARTERS DURING THE FIRST QUARTER.
o A LARGE NUMBER OF CIVIL ACTIONS, 50, WERE REFERRED TO DOJ DURING THE
FIRST QUARTER, COMPARED TO 100 CIVIL ACTIONS REFERRED TO DOJ FOR
ALL OF FY 82.
O OF THE 65 CRIMINAL CASES PENDING AT THE END OF THE FIRST QUARTER,
ONLY 3 CASES WERE PENDING AT EPA HEADQUARTERS. THE REMAINING 62
CASES ARE PENDING AT DOJ, U. S. ATTORNEY, OR DISTRICT COURTS.
o TEN CRIMINAL CASES WERE RESOLVED DURING FIRST QUARTER; 3 WERE
SETTLED, 5 WERE WITHDRAWN BY REGION OR DECLINED BY HEADQUARTERS,
AND 2 WERE DECLINED BY DOJ OR U. S. ATTORNEY.
-96-
-------
K>
oo
UJ
)
3
O
60-i
50-
40-
-------
ENFORCEMENT
OLEC POLICY AND GUIDANCE ACTIVITIES
ENFORCEMENT CONSENT DECREE TRACKING
ENFORCEMENT INDICATORS
CIVIL PENALTY/SETTLEMENT POLICY
SETTLEMENT PROCEDURES
MODEL CONSENT DECREE TERM
COORDINATING FEDERAL AND STATE
ENFORCEMENT
ENFORCEMENT/COMPLIANCE GUIDANCE
MANUALS (INCLUDING COMPENDIUM OF
OPERABLE POLICIES)
- AIR
- WATER
- CERCLA
- PESTICIDES
- TOXICS
RCRA
STATUS
ON SCHEDULE
ON SCHEDULE
ON SCHEDULE
MET TARGET, AND
WAITING FOR DOJ
COMMENT
MET TARGET, AND
WAITING FOR DOJ
COMMENT
ON SCHEDULE
ON SCHEDULE
ON SCHEDULE
ON SCHEDULE
ON SCHEDULE
ON SCHEDULE
ON SCHEDULE
-------
OFFICE OF CIVIL RIGHTS
MEETING PROGRAM COMMITMENTS
DISCRIMINATION COMPLAINTS
o AT THE BEGINNING OF FY 83, 148 FILED COMPLAINTS OF DISCRIMINATION
WERE PENDING RESOLUTION.
o DURING THE FIRST QUARTER, 14 NEW COMPLAINTS WERE FILED AND 11
COMPLAINTS WERE CLOSED. THEREFORE, THE TOTAL NUMBER OF COMPLAINTS
PENDING AT THE END OF THE QUARTER WAS 151.
o OF THE COMPLAINTS CLOSED, THE AVERAGE NUMBER OF DAYS FROM FILING
TO CLOSURE WAS 627 DAYS. OFFICE OF CIVIL RIGHTS TARGET FOR FY 83
IS 407 DAYS, THE AVERAGE NUMBER OF DAYS TO CLOSE A COMPLAINT FOR
ALL AGENCIES IN FY 81.
-99-
-------
OFFICE OF FEDERAL ACTIVITIES
MEETING PROGRAM COMMITMENTS
309 AND EIS REVIEW (HEADQUARTERS ONLY)
o DURING THE FIRST QUARTER, 28 OF THE 35 ACTIONS PENDING 309 REVIEW
WERE COMPLETED.
o 90% OF 309 REVIEWS COMPLETED WERE COMPLETED ON TIME.
O SEVEN EPA EISs WERE PEER REVIEWED DURING THE QUARTER AND ALL WERE
REVIEWED ON TIME.
O DURING THE FIRST QUARTER, 164 NEW ACTIONS, 87 DRAFT AND 77 FINAL
EISS, WERE FILED BY FEDERAL AGENCLES. ALL FEDERAL REGISTER
NOTICES WERE PUBLISHED ON TIME.
-100-
-------
K)
CO
Ul
to
2
O
40-
35-
30-
25-
Q)
E 20~
15-
10-
5-
0
SECTION 309 REVIEWS
From September 30, 1982 To December 31, 1982
-I
<<
o
LO
£§
a
90% OF 309 REVIEWS
COMPLETED ON TIME
95
a
-1UL-
-------
OFFICE OF INSPECTOR GENERAL
MEETING PROGRAM COMMITMENTS
o THIS YEAR DIG WILL REPORT AGAINST QUARTERLY TARGETS FOR AUDITING
COMPLETED CONSTRUCTION GRANTS PROJECTS.
o DURING THE FIRST QUARTER OIG SCREENED THE TOTAL NUMBER OF PROJECTS
AWAITING AUDIT, USING NEW SELECTION CRITERIA TO TARGET AUDIT RESOURCES
MORE EFFECTIVELY.
o AT THE END OF THE FIRST QUARTER THE TOTAL NUMBER OF PROJECTS
AWAITING AUDIT WAS REDUCED BY 42%.
-102-
-------
K)
Ul
O
INSPECTOR GENERAL
CONSTRUCTION GRANTS AUDITS PENDING
( CURRENT WORKLOAD )
As Of December 31, 1982
1300 H
TOTAL AUDIT
1 2 3
QUARTERS
O TARGET
•
-------
MANAGING FOR ENVIRONMENTAL
RESULTS
TABLE OF CONTENTS
OBJECTIVE PAGE
PREPARING ENVIRONMENTAL MANAGEMENT REPORTS 106
DEVELOPING ENVIRONMENTAL INDICATORS 106
REPORTING AGAINST INDICTORS 108
POPULATION SERVED BY COMMUNITY WATER SUPPLY SYSTEMS
IN COMPLIANCE WITH DRINKING WATER STANDARDS 110
-105-
-------
MANAGING FOR ENVIRONMENTAL RKSU1LTS
REGIONAL ENVIRONMENTAL MANAGEMENT REPORTS (EMRs)
o ALL REGIONS ARE ON SCHEDULE TO DEVELOP DRAFT EMRs BY MARCH 18, 1983
AND FINAL EMRs BY MAY 11, 1983.
DEVELOPMENT OF ENVIRONMENTAL RESULTS INDICATORS (ERIs)
O EACH AA HAS COMMITTED (1) TO IDENTIFY AND REPORT AGAINST THOSE
INDICATORS AVAILABLE FOR IMMEDIATE REPORTING AND (2) TO SUBMIT A
SCHEDULE TO DEVELOP AND REPORT AGAINST ADDITIONAL INDICATORS
FOR WHICH DATA ARE NOT CURRENTLY AVAILABLE.
o HEADQUARTERS PROGRAM OFFICES ARE MAKING SPOTTY PROGRESS TOWARD
DEVELOPING THE ENVIRONMENTAL INDICATORS NECESSARY TO MANAGE FOR
ENVIRONMENTAL RESULTS. HOWEVER, ALL PROGRAMS PROPOSED AT LEAST ONE
IMMEDIATELY AVAILABLE INDICATOR FOR REPORTING THIS FISCAL YEAR:
- OW HAS PROVIDED BASELINE DATA (FY 81) FOR A DRINKING WATER ERI
AND WILL REPORT ON THREE OTHER INDICATORS IN SUBSEQUENT QUARTERS.
- OANR HAS COMPLETED A REVIEW OF INDICATORS AND HAS COMMITTED TO
REPORT ON ONE INDICATOR THIS YEAR. THEY HAD AGREED TO REPORT
THIS INDICATOR IN THE THIRD QUARTER BUT NOW PLAN TO REPORT
IN THE FOURTH QUARTER.
- OPTS HAS PROPOSED TWO TSCA INDICATORS FOR REPORTING IN THE THIRD
QUARTER OF THIS YEAR AND ONE FOR FIFRA WITH AN UNSPECIFIED REPORTING
DATE.
- OSWER HAD PROPOSED TWO INDICATORS FOR THE FIRST QUARTER BUT DID
NOT PROVIDE DATA. THEY ARE REVIEWING WHETHER THEY WILL BE
ABLE TO REPORT ON THESE INDICATORS IN THE FUTURE.
o OMSE WILL MEET WITH EACH PROGRAM OFFICE THIS QUARTER TO REVIEW THE
PROPOSED ERIs AND NEGOTIATE FINAL INDICATORS AND REPORTING SCHEDULES.
_ 1 M£_
-------
SCHEDULE FOR DEVELOPMENT OF ENVIRONMENTAL RESULTS INDICATORS
PROPOSED BY THE PROGRAM OFFICES
OW
OANR
OPTS
OSWER
PROPOSED ERIs FOR IMMEDIATE REPORTING
Population served by Community Water
Supplies in violation of turbidity and
microbiological standards
Water quality limited and effluent limited
segments meeting designated uses
Number of State Construction Grant
Priority Systems that are based on
final Construction Grant regulations
Completion of State guidance to suppor.t
States' implementation of the water quality
approach
Changes in the number, oxtent and location of
non-attainiuent areas
PCBs in human tissue
Number of schools with or without asbestos
Estimates for exposure and risk reduction
from actions taken under Pesticide Special
Review
Sites where action has begun or been
completed under CERCLA by States, EPA,or
private portions
Capacity of new and existing facilities
issued RCRA permits
DATE FOR REPORTING
•81 data - 1st Qtr -
'82 data - 2nd Qtr -
3rd quarter FY 83
4th quarter FY 83
2nd quarter FY 83
FY 83
FY 83
- Fourth Quarter FY 83*
3rd Quarter FY 83('79 and
•81 data)
3rd Quarter FY 84
Unspeci f ied
Proposed for
FY 83 but no
provided
Proposed tor
FY 83 but no
provided
1st Quarter
data were
1st Quarter
data were
*Note:
This is a
the Third
change from
Quarter.
the earlier commitment to report an indicator in
-------
MANAGING FOR ENVIRONMENTAL RESULTS
DEVELOPMENT OF ADDITIONAL ENVIRONMENTAL RESULTS INDICATORS
FOR FUTURE REPORTING
O EACH AA HAS COMMITTED TO DEVELOP ADDITIONAL ENVIRONMENTAL RESULTS
INDICATORS TO PROVIDE A MORE COMPREHENSIVE PICTURE OF THE ENVIRONMENTAL
EFFECTIVENESS OF THEIR PROGRAMS.
O THE PROGRAMS DO NOT PLAN TO REPORT ON THESE ADDITIONAL INDICATORS
UNTIL FIRST QUARTER OF FY 84.
- OW HAS PREPARED A DRAFT SET OF ADDITIONAL INDICATORS AS PART OF
THE OFFICE OF WATER FY 84 OPERATING YEAR GUIDANCE AND ACCOUNTABILITY
SYSTEM (OWOGAS).
- OANR PROPOSES TO ENGAGE A CONTRACTOR TO INVESTIGATE ADDITIONAL
INDICATORS. THEY PLAN TO REPORT AGAINST THESE ADDITIONAL INDICATORS
IN FY'84.
- OPTS IS CONTINUING TO WORK ON ADDITIONAL INDICATORS AND WILL REPORT
AGAINST THESE ADDITIONAL INDICATORS AS THEY ARE DEVELOPED.
- OSWER HAS COMMITTED TO PROVIDE A SCHEDULE IN THE SECOND QUARTER
TO DEVELOP AND REPORT AGAINST ADDITIONAL INDICATORS.
-1U8-
-------
ow
OANR
OPTS
OSWER
PROPOSALS FOR DEVELOPMENT OF
ADDITIONAL ENVIRONMENTAL RESULTS INDICATORS
STATUS OF PROPOSALS
FOR ADDITIONAL ERIs
Draft OW Program Guidance and
Accountability System
submitted 1/21/83
Proposed to engage a con-
tractor in FY 83 to
investigate additional
indicators and report in
Fourth Quarter FY 83.
the
Will Report on additional
indicators as they are
finalized.
Schedule for development of
additional ERIs due 2nd
quarter FY 83
PROPOSED REPORTING DATE
FOR NEW INDICATORS
First Quarter FY 84
FY 84
No date provided
-Loy-
-------
POPULATION SERVED BY COMMUNITY PUBL1C WATER SUPPLY SYSTEMS
WITH PERSISTENT VIOLATIONS OF DRINKING WATER STANDARDS
o ALL STATES EXCEPT 6 (DC, PA, IN, SD, WY AND OR) HAVE PRIMARY
ENFORCEMENT RESPONSIBILITY OF THE NATIONAL PRIMARY DRINKING WATER
REGULATIONS.
o MOST OF THE VIOLATIONS ARE OCCURRING AMONG THE SMALLER WATER SUPPLY
SYSTEMS.
o FY 82 STATISTICS WILL BE REPORTED DURING THE THIRD QUARTER.
FOR MICROBIOLOGICAL STANDARDS
o IN FY 81, 70% OF COMMUNITY PUBLIC WATER SYSTEMS (CWS) WERE REPORTED
TO BE IN COMPLIANCE WITH BOTH THE MAXIMUM CONTAMINANT LEVEL (MCL)
AND MONITORING AND REPORTING (M/R) REQUIREMENTS. OF THE VIOLATORS:
- 20% WERE INTERMITTENT VIOLATORS (3 OR FEWER MONTHS IN VIOLATION)
SERVING 10% OF THE POPULATION SERVED BY CWSs.
- 10% WERE PERSISTENT VIOLATORS (4 OR MORE MONTHS IN VIOLATION)
SERVING ABOUT 2.5% OF THE POPULATION SERVED BY CWSs.
FOR TURBIDITY STANDARDS
o ALSO IN rY_8JL , 86% OF COMMUNITY WATER SYSTEMS (CWS) WERE REPORTED
TO BE IN COMPLIANCE WITH BOTH MCL AND M/R REQUIREMENTS. OF THE
VIOLATORS:
- 7% WERE INTERMITTENT VIOLATORS SERVING 5% OF THE POPULATION SERVED
BY CWSs.
7% WERE PERSISTENT VIOLATORS SERVING ABOUT 4% OF THE POPULATION
SERVED BY CWSs.
-110-
-------
POPULATION SERVED BY
COMMUNITY PUBLIC WATER SUPPLY SYSTEMS
As Of December 31, 1982
MEETING MICROBIOLOGICAL STANDARDS
MEETING TURBIDITY STANDARDS
lOO-i
81 82
FISCAL YEAR
TOTAL POPULATION: 227.5 MILLION
(SURFACE AND GROUND WATER
SUPPLY SOURCE)
to
00
Ul
V}
o
81 82
FISCAL YEAR
TOTAL POPULATION: 155 MILLION
(SURFACE WATER SUPPLY SOURCE ONLY)
Legend
CD PERSISTENT VIOLATIONS
BH INTERMITTENT VIOLATIONS
•i NO VIOLATIONS
-111-
-------