                                PREFACE


This is the fourth quarter FY 1983 report of EPA's Management
Accountability System.  It reports performance during the previous
quarter and over the course of the year on specific program objectives
and individual management commitments in support of the Agency's major
goals.  The report is published each quarter by the Office of Management
Systems and Evaluation (OMSE) using information provided by Headquarters
and Regional Offices.

We gratefully acknowledge the continuing assistance and cooperation of
the many people in Headquarters program offices and in the Regions who
have made timely production of this report possible.  We invite
continuing examination of this report and the goals, objectives,
commitments and measures contained in the Management Accountability
System.  We would appreciate any suggestions you have for improving the
system, and invite you to contact either Lewis Crampton or Jim Vickery
with your ideas.

-------
                           TABLE OF CONTENTS

        OFFICE                                                 PAGE

OFFICE OF AIR, NOISE AND
  RADIATION 	    1

OFFICE OF WATER	   19

OFFICE OF SOLID WASTE AND
  EMERGENCY RESPONSE	   45

OFFICE OF PESTICIDES AND
  TOXIC SUBSTANCES	   61

OFFICE OF ADMINISTRATION	   83

OFFICE OF POLICY, PLANNING
  AND EVALUATION	   89

OFFICE OF RESEARCH AND DEVELOPMENT	   93

OFFICE OF ENFORCEMENT COUNSEL	   97

OFFICE OF FEDERAL ACTIVITIES	'	  103
                                  ill

-------
            DEVELOPING AND REVIEWING  CRITICAL  REGULATIONS




              OANR SCHEDULE  FOR NSPS  PRIORITY  CATEGORIES
STANDARD
SOCMI FUGITIVE
LEAKS
SIC ENGINES
BEVERAGE CANS
BULK GAS TERMINALS
TAPES AND LABELS
SOCMI AIR OXIDATION
ONSHORE GAS
PROD. (2)
NONMETALLIC
MINERALS
SOCMI DISTILLATION
INDUSTRIAL BOILERS
(2)
SOCMI VOL STORAGE
PROPOSAL
F.R. DATE
1/81
7/79
11/80
12/80
12/80
5/83
5/83
4/83
5/83
9/83
9/83
PROMULGATION
F.R. DATE
5/83
5/83
5/83
4/83
4/83
7/84
7/84
6/84
7/84
11/84
11/84
STATUS*
COMPLETED 9/24/83.

OFF SCHEDULE; HELD BY
ADMINISTRATOR.
COMPLETED 8/25/83.

COMPLETED 8/18/83.

COMPLETED; SIGNED
10/7/83.
OFF SCHEDULE; NPRM
SIGNED 10/7/83.
OFF SCHEDULE; TO OMB
9/2/83.
OFF SCHEDULE; NPRM
PUBLISHED 8/31/83.
OFF SCHEDULE; TO OMB
9/7/83.
OFF SCHEDULE; REVISED
PER ALM MTG 9/16/83.
OFF SCHEDULE; TO OMB
8/25/83.
* BASED ON INTERIM MILESTONES,

-------
             DEVELOPING AND REVIEWING CRITICAL  REGULATIONS

           OANR SCHEDULE FOR FY 83 PROPOSAL AND PROMULGATION
STANDARD
PROPOSAL
F.R. DATE
PROMULGATION
F.R. DATE
STATUS*
                  NATIONAL AMBIENT AIR QUALITY  STANDARDS
CARBON MONOXIDE1
PARTICULATE MATTER2
NITROGEN DIOXIDE2
SULFUR DIOXIDE2
—
9/83
9/83
3/84
4/83
8/84
8/84
2/85
OFF SCHEDULE, -NEW SCHED-
ULE DUE 12/12/83.
OFF SCHEDULE; AGENCY
REVIEW DUE 10/30/83.
OFF SCHEDULE; OMB REVIEW
DUE 8/83
OFF SCHEDULE; OPTIONS
MEMO DUE 11/30/83.
        NATIONAL EMISSION STANDARDS FOR HAZARDOUS  AIR POLLUTANTS
COKE OVEN2
(BENZENE)
ASBESTOS REVISION2
BENZENE2
(FOUR CATEGORIES)
ARSENIC
1/84
6/83
—
7/83
--
9/84
1/84
—
OFF SCHEDULE; DUE TO RB
10/30/83.
OFF SCHEDULE;
F.R. 7/13/83
OFF SCHEDULE; DUE TO RB
10/30/83.
REVISED SCHEDULE; DUE
12/12/83
*BASED ON INTERIM MILESTONES
      SCHEDULE HAS NOT BEEN PROVIDED.
 2REVISED SCHEDULES.

-------
             DEVELOPING AND REVIEWING CRITICAL REGULATIONS
     OANR SCHEDULE FOR FY 83 PROPOSAL AND PROMULGATION  (CONTINUED)
STANDARD
PROPOSAL
F.R. DATE
PROMULGATION
F.R. DATE
STATUS*
                         RADIATION REGULATIONS
INACTIVE URANIUM
MILL TAILINGS SITES
RADIONUCLIDES2
NESHAP
DISPOSAL OF HIGH
LEVEL RADIOACTIVE
WASTE2
ACTIVE URANIUM MILL
TAILINGS SITES2
—
3/83
12/82
4/83
11/82
9/83
12/83
9/83
COMPLETED

OFF SCHEDULE;
SCHEDULE REVISED TO
F.R. 12/30/83
OFF SCHEDULE; SCHEDULE
REVISED TO F.R.
1/14/84.
COMPLETED;
F.R. 9/30/83
                       MOBILE SOURCES REGULATIONS
HD-HC/CO
POSTPONEMENT
HD-HC/CO REVISION2
LD DIESEL AVERAGING
LD DIESEL
POSTPONEMENT2
LEAD PHASE DOWN
—
—
—
12/82
—
1/83
9/83
12/82
10/83
11/82
COMPLETED

COMPLETED; TO AX
10/5/83.
COMPLETED

OFF SCHEDULE; IN SC,
FINAL DUE 1/84.
COMPLETED

*BASED ON INTERIM MILESTONES




 2REVISED SCHEDULE.

-------
                      MEETING PROGRAM COMMITMENTS

               PERCENT OF SIP REVISIONS  PROCESSED ON TIME

o  NATIONALLY, THE SIP ON-TIME PROCESSING  RATE  DECLINED FROM 91% AT THE
   BEGINNING OF THE YEAR TO 83% AT THE END OF THE YEAR.

o  MOST REGIONS ARE PROCESSING MORE THAN 90% OF THEIR SIP ACTIONS
   WITHIN THE ALLOTTED FIVE MONTH TARGET.   THE  MAJOR PROBLEM APPEARS
   TO LIE WITH HEADQUARTERS.

o  DECLINING HEADQUARTERS PERFORMANCE WAS  THE RESULT OF A GROWING
   BACKLOG OF SIPS WITH UNRESOLVED POLICY  ISSUES.
   -  NINETEEN OF THE 36 LATE SIPS AT HEADQUARTERS ARE BEING HELD
      AWAITING MAJOR POLICY DECISIONS OR SETTLEMENT OF THE NRDC NEW
      SOURCE REVIEW LAWSUIT.
   -  ELEVEN OF THE LATE SIPS NOW APPEAR TO BE  MAKING SATISFACTORY PROGRESS
      THROUGH FINAL REVIEW.
   -  THE REMAINING SIX LATE SIPS NEED RESOLUTION OF TECHNICAL ISSUES BY
      PROGRAM OFFICES.

-------
                          PERCENT OF SIP REVISIONS
                             PROCESSED ON TIME


                          As Of September 30, 1983
      100 -rs
   ui
   o
   CK
   LJ
   OL
                                          TAROKT
#3IPs IN PROCESS:   315
K>
 234

QUARTERS
354    320
                                  283
                       Legend

            IZ2 HEADQUARTERS ( TARGET - 2 MOS. )

               REGIONS ( TARGET - 5 MOS. )
                                                       NATIONAL

-------
                      MEETING PROGRAM COMMITMENTS

                          SPECIAL ACTION  SIPs


PROGRESS ON 1982 OZONE/CO SIPs

o  A REVISED SCHEDULE FOR COMPLETING ACTION ON THE  SIPs  HAS  BEEN
   DEVELOPED BASED ON THE SANCTIONS POLICY.

o  PUBLICATION OF THE SANCTIONS POLICY ON SEPTEMBER 30,  1983 HAS BEEN
   DELAYED BY OMB.

o  UNDER THE NEW SCHEDULE, FINAL NOTICES  AND REPROPOSED  ACTIONS (EXCLUDING
   SANCTIONS ACTIONS) ARE DUE PUBLICATION BY MARCH  1,  1984.

PROGRESS ON LEAD SIPs

o  OF EIGHT PLANS SUBMITTED BEFORE MARCH  1, 1983, ACTION IS  ON SCHEDULE
   FOR SEVEN:

   - SIX FINAL APPROVAL (FOUR HAVE BEEN PUBLISHED).

   - ONE PROPOSED DISAPPROVAL.

o  LOUISIANA IS BEHIND SCHEDULE DUE TO NEED TO PREPARE ADDITIONAL ANALYSIS
   EPA MAY NOT BE ABLE TO TAKE ACTION AS  REQUIRED BY NOVEMBER 1, 1983
   BUT IS WORKING ON AN EXTENSION.

O  OF 18 STATES WITH SERIOUS LEAD PROBLEMS THAT  WERE REQUIRED TO SUBMIT
   PLANS BY AUGUST 1, 1983, FIVE HAVE SUBMITTED  FINAL PLANS  AND EIGHT
   HAVE SUBMITTED DRAFT PLANS.

o  OF THE REMAINING FIVE STATES WITH LEAD PROBLEMS:

   - THREE ARE EXPECTED TO SUBMIT PLANS IN TIME  FOR EPA  TO PROPOSE
     BY JANUARY 3, 1984 AS REQUIRED.

   - NEBRASKA AND IDAHO MAY NOT COMPLETE  PLANS IN TIME AND EPA
     WILL NEED TO GIVE NOTICE OF INTENT TO PROMULGATE FEDERAL
     PLANS.

-------
                      MEETING PROGRAM  COMMITMENTS

AIR TOXICS STRATEGY

o  FINAL STRATEGY DOCUMENT WAS NOT  SUBMITTED  TO  ADMINISTRATOR AS PLANNED.

o  COMPLETION OF THE STRATEGY IS  DEPENDENT  UPON  THE ADMINISTRATOR'S
   DECISIONS ON NESHAPS FOR ARSENIC AND  BENZENE.

O  DEVELOPMENT OF THE AIR TOXICS  CLEARINGHOUSE  IS  ON SCHEDULE.

ENVIRONMENTAL RESULTS INDICATORS

O  A REPORT ON CHANGES IN STATUS  AND TRENDLINES  FOR NONATTAINMENT
   AREAS WAS SUBMITTED ON SCHEDULE.

o  EVALUATION OF THE CONTRACTOR'S FEASIBILITY REPORT FOR ADDITIONAL
   INDICATORS IS AWAITING SUBMISSION OF  THE FINAL  REPORT, NOW EXPECTED
   BY THE END OF OCTOBER.

o  RECOMMENDATIONS FOR ADDITIONAL INDICATORS  ARE EXPECTED BY THE END
   OF THE FIRST QUARTER, FY 84.

-------
                            AIR ENFORCEMENT

o  AS EXPECTED, A SLIGHT DECLINE IN COMPLIANCE  HAS  OCCURRED DURING THE
   FISCAL YEAR.  NINETY-TWO PERCENT OF MAJOR  SOURCES  ARE  IN COMPLIANCE
   AT THE END OF THE FISCAL YEAR IN COMPARISON  TO 93% AT  THE BEGINNING.
   AN ADDITIONAL TWO PERCENT ARE ON ACCEPTABLE  COMPLIANCE SCHEDULES.

o  SIGNIFICANT VIOLATORS DECLINED DURING THE  FOURTH QUARTER BUT THE
   NUMBER OF SIGNIFICANT VIOLATORS PENDING WITHOUT  BEING  PLACED ON AN
   ACCEPTABLE SCHEDULE FOR LONGER THAN TWO QUARTERS IS STILL INCREASING,
   - SIGNIFICANT VIOLATORS DECREASED FROM 365 TO 342  DURING
     THE FOURTH QUARTER.
   - 65 NEW SIGNIFICANT VIOLATORS WERE DETECTED.
   - 59 SIGNIFICANT VIOLATORS WERE RETURNED TO  COMPLIANCE
     AND 29 WERE PLACED ON ACCEPTABLE COMPLIANCES SCHEDULES.

o  THE STATE COMPLIANCE INSPECTION RATES HAVE IMPROVED FROM 48% AT THE
   BEGINNING OF THE YEAR TO 76% FOR CLASS Al  SIP SOURCES.  SIMILARLY,
   INSPECTION OF CLASS A2 SIP SOURCES INCREASED FROM  68%  TO 84% BY THE
   END OF THE YEAR.
   - REGION IX ACHIEVED 100 PERCENT FOR BOTH  CLASS  Al AND A2
     SIP SOURCES DUE INSPECTIONS.
   - MOST REGIONS WITH LOW INSPECTION RATES SHOWED  IMPROVEMENT
     THIS QUARTER.

-------
               PROGRESS IN RETURNING AIR VIOLATORS TO COMPLIANCE

                              As Of September 30, 1983
                SIGNIFICANT VIOLATORS
                  OUT OF COMPLIANCE
               LONGER THAN 2 QUARTERS
         100-
         73-
      O  50-
         25-
                  1       2      3
                      QUARTER
                                                 MAJOR SOURCE COMPLIANCE RATE
                                          COMPLIANCE
                                          92.0X
                                                                                8.0X
                                                              INSPECTION PATE: SOX
                                                              OP SOURCES DUE INSPECTION
ro

*x
of"
PENDING
ACTION:
303    328    365    342

-------
                          DELEGATION TO STATES

                    NEW SOURCE PERFORMANCE  STANDARDS

o  THE REGIONS ACHIEVED 94% NSPS DELEGATION OVERALL,  JUST SHORT OF
   THE COMMITMENT OF 95% DELEGATION OVERALL.

o  REGION V ACHIEVED 100 PERCENT DELEGATION,  AS  PROJECTED DURING
   THE FOURTH QUARTER, AND NOW JOINS REGION I AND VI  WITH 100 PERCENT
   DELEGATION.

o  OTHER REGIONS EXPECT TO COMPLETE DELEGATION COMMITMENTS EARLY
   IN FY 84.

o  REGION IX ACHIEVED 100% DELEGATION OF  NSPS TO HAWAII,  WELL AHEAD
   OF THE ANTICIPATED DELEGATION DATE.

-------

-------
                           DELEGATION STATUS OF NSPS


                            As Of September 30, 1983
          too
or
ui
V)
       Q
       LJ
       Q
       UI
       O
       o:
                                                           TARGET
           25-
          I    II
                                IV   V   VI   VII  VIII   IX    X

                                     REGIONS
DELEGATED: 109   86   141   135  208   74    61   157   275   83
                                        -13-

-------
                          DELEGATION TO STATES

        NATIONAL EMISSION STANDARDS FOR HAZARDOUS  AIR POLLUTANTS

o  THE REGIONS ACHIEVED 95% NESHAPS DELEGATION  OVERALL,  SHORT OP THE
   COMMITMENT OF 97% DELEGATION OVERALL.

o  REGIONS V AND IX JOINED REGIONS IV, VI AND VIII WITH  100% NESHAPS
   DELEGATION DURING THE FOURTH QUARTER.

o  REGIONS II AND VII MISSED FOURTH QUARTER  DELEGATION TARGETS,
   WHILE REGION IX ACHIEVED FULL DELEGATION  BY  ADDING HAWAII AHEAD
   OF SCHEDULE.
                                  -14-

-------
 ui
 10

Lfi
        Q
        UI
        Q

        h-

        Ul
        O
        Of
        LU
        Q.
                          DELEGATION STATUS OF NESHAPS

                             As Of September 30, 1983
                             III   IV   V   VI  VII  VIII  IX   X

                                      REGIONS

         ^DELEGATED: 64   32    67   59   120   41   32   73   217   37
                                                                    TAROET

-------
                          DELEGATION TO  STATES

                PREVENTION OF SIGNIFICANT  DETERIORATION

o  FOUR STATES WITH NO PSD RESPONSIBILITY  AT  THE  BEGINNING OF THE YEAR
   ACCEPTED FULL RESPONSIBLITY AND TEN STATES WENT FROM PARTIAL TO FULL
   DELEGATION DURING THE FISCAL YEAR.

o  FLORIDA, MONTANA AND WASHINGTON ACCEPTED FULL  PSD RESPONSIBILITY ON
   SCHEDULE DURING THE QUARTER.

o  THREE STATES DID NOT COMPLETE ASSUMPTION OF  PSD RESPONSIBILITY AS
   PROJECTED, BUT WILL ACCEPT RESPONSIBILITY  IN EARLY FY 84.

O  HAWAII, NEBRASKA, AND OKLAHOMA ACCEPTED FULL PSD RESPONSIBILITY
   AHEAD OF SCHEDULE.

-------
K)
                    DELEGATION STATUS OF PSD
                    As  Of  September 30,1983
                      ill    IV
                         v    vi
                         REGIONS
                                   VII   VIII    IX
         S«l«oi«d local ag«ncUn with lndtp«nd«nt authority :
 PA - All«ah«ny Co. Phllodtlphta
 AZ - Marioopa Co, Plma Co
 CA - Bay Ar*a Df«t, Ktrn Co, Sai
 NV - dark Co, Wajho* Co

 Exolutlon* : Rvglon II ~ PR.VI; Rtaton VIII - SO;
	Rtglon IX - QU. AS. TT
CA - Bay Area Df«t, Ktrn Co. San Dl*go Co, So Coatt Dttt, Vtntura Co
NV - dark Co, Wajho« Co
                                                                      8
                                                                      D
                                                                         a-i


                                                                         4
                                                                      <

                                                                      3  21


' A • *
* Al *
:PH:


MR
PM


VC
SO
SC
KC
BA
                                                                               PA   AZ   CA   NV
                                                                                     STATES
                                                                               Legend
                                                                            CD NONE	12
                                                                            E3 PflRTIflL— 12
                                                                            •I FULL	38
                                                                    •• TARGETED TOR FULL
                                                                       DELEGATION IN FY-83
• TARGETED FOR PARTIAL
  PROGRAM DELEGATION
  IN FY-83

-------
                          DELEGATION  TO  STATES

NATIONAL AIR AUDIT SYSTEM

o  FINAL DRAFT GUIDANCE WAS SENT  TO STATES FOR COMMENT DURING SEPTEMBER,

o  ISSUANCE OF FINAL GUIDANCE WILL OCCUR DURING THE FIRST QUARTER OF
   FY 84, ACCORDING TO THE REVISED SCHEDULE CONTAINED IN THE FY 84
   COMMITMENTS.

o  AUDITS OF STATE PROGRAMS WILL  OCCUR DURING FY 84 AS PLANNED IN
   ACCORDANCE WITH THE NEW AUDIT  CRITERIA.

TAMPERING AND FUEL SWITCHING PROGRAMS

o  REGIONS ACHIEVED ALL FOURTH QUARTER COMMITMENTS FOR HAVING OPERATING
   PROGRAMS OR ACTIVELY CONSIDERING PROGRAM OPTIONS.

o  FOR THE YEAR, PROGRAM COMMITMENTS  WERE MET FOR ALL 32 AREAS EXPECTED
   TO HAVE PROGRAMS.

o  REGION V GOT NINE PROGRAMS COMMITTED, AND EACH REGION ACHIEVED AT
   LEAST ONE PROGRAM COMMITMENT.

-------
100
               CONSTRUCTION GRANTS DELEGATION STATUS
           PERCENT WORKLOAD DELEGATED TO STATES & CORPS
                      As Of Seplember 30, 1983
                                                    PERCENT - NATIONWIDE
                                                   100-i
                                                        NONE
                                                   75 '
                                                     82  1  234
                                                         QUARTERS
                                                          Legend
                                                    OB CORPS OF ENGINEERS
                                                    E2 STATE
                                                    CD NONE

-------
                          DELEGATION  TO  STATES

                    STATE ASSUMPTION  OF  NPDES AUTHORITY

O  AT THE START OF FY 83, TEN STATES  HAD ASSUMED FULL DELEGATION.  BY
   THE END OF FY 83, SEVENTEEN STATES WERE  SCHEDULED FOR FULL DELEGATION,

O  THE PROGRAM JUST MISSED ACHIEVING  ITS FY 83  GOAL.  THREE STATES WERE
   DELEGATED DURING THE THIRD AND  FOURTH QUARTERS MAKING A TOTAL OF
   FIFTEEN FULLY DELEGATED STATES.

O  REGIONS IV, V, VII AND IX WERE  THE ONLY  REGIONS SCHEDULED TO
   DELEGATE NPDES PROGRAM ACTIVITIES  IN  FY  83.

O  DURING THE LAST TWO QUARTERS, REGIONS IV AND V AGAIN MET THEIR
   TARGETS:
   -  KENTUCKY ASSUMED FULL DELEGATION.
   -  MICHIGAN AND OHIO ASSUMED  FULL  DELEGATION AFTER ACCEPTING
      PRETREATMENT.
   -  TENNESSEE ADDED PRETREATMENT TO ITS BASE  NPDES ACTIVITIES.

O  REGIONS VII AND IX WERE UNABLE  TO  MEET THEIR DELEGATION TARGETS
   DUE TO STATE DELAYS AND PROBLEMS WITH STATE  REGULATIONS.

O  REGION IX SUCCESSFULLY COMPLETED DELEGATION  OF THE PROGRAM TO HAWAII
   EVEN THOUGH IT WAS NOT SCHEDULED FOR  FY  83.

-------
to
               STATE ASSUMPTION OF NPDES AUTHORITY
                       As Of  September 30,1983
                                                                           Leqend
                                                                 CD NO flSSUMED fitfriVITIES      17
                                                                 CZ3 NPDES ONLY                7
                                                                 E3 NPDES 4 ONE OTHER ACTIVITY  11
                                                                 H FULL RSSUHPTION           15
                         III    IV
                V   VI
                REGIONS
VII   VIII   IX
Asiumabl* activities art NPDES, federal Foollttl**
and Pr*tr»atmcnt.
                                                                     •• TARGETED FX)R FULL
                                                                       ASSUMPTION IN FY-83
                                                                       TARGCTED FOR ONE MORE
                                                                       ACTIVITY IN FY-83

-------
                           DELEGATION TO STATES

         STATE UNDERGROUND INJECTION CONTROL PROGRAMS APPROVED
O  AT THE START OF FY 83,  FOUR STATES HAD ASSUMED FULL PRIMACY AND
   THREE STATES HAD PARTIAL  PROGRAM APPROVAL.  TWENTY-SEVEN STATES
   WERE SCHEDULED FOR FULL PRIMACY  AND THREE FOR PARTIAL APPROVAL BY
   THE END OF THE YEAR.

O  THE PROGRAM MISSED ITS  FY  83 GOAL.  FIVE STATES ASSUMED FULL
   PRIMACY DURING THE FOURTH QUARTER MAKING A TOTAL OF TWELVE STATES
   WITH FULL PRIMACY AND THREE WITH PARTIAL PROGRAM APPROVAL.

O  AT THE END OF FY 83, STATE UIC PROGRAMS COVERED ABOUT 56% OF THE JUNE
   1983 NATIONAL INVENTORY OF INJECTION WELLS.  THEY HAD BEEN TARGETED
   TO COVER ABOUT 85%.

O  DURING THE FOURTH QUARTER, MAINE, NEW JERSEY, ALABAMA, NEW MEXICO
   AND WYOMING ASSUMED  FULL  PRIMACY AND MISSISSIPPI, OHIO AND NORTH
   DAKOTA RECEIVED PARTIAL PROGRAM  APPROVAL.  THE VIRGIN ISLANDS WERE
   ADDED TO THE LIST OF STATES REQUIRING A FEDERAL PROGRAM.

O  REGION III MET ITS TARGET FOR SUBMITTAL OF THE DELAWARE APPLICATION
   DURING THE FOURTH QUARTER.

O  REGIONS I, II, IV, IX AND X MISSED THEIR TARGETS FOR SUBMISSION OF
   NINE APPLICATIONS.

O  HEADQUARTERS MISSED  ITS REVIEW AND APPROVAL TARGET IN THE CASE OF
   TEN APPLICATIONS.

   -  SIX WERE FORWARDED TO  THE ADMINISTRATOR AND SHOULD BE APPROVED
      BY NOVEMBER.

   -  FOUR WERE RETURNED TO  THE REGIONS FOR FURTHER WORK WITH THE STATES

O  UIC DIRECT IMPLEMENTATION REGULATIONS ARE NOW FOUR MONTHS BEHIND
   SCHEDULE.  THEY TOOK MORE TIME THAN ANTICIPATED TO CLEAR THE
   ADMINISTRATOR'S OFFICE.

                                    -•)&.-

-------
                    STATE UIC PROGRAMS  APPROVED
                        As Of  September 30,1983
                          III    IV
               v    vi
               REGIONS
VII   VIII    IX
                                                                             Legend
                                                                      FULL PRIMRCY	12
                                                                   E3 CLftSS I,  III, IV, V HELLS- 3
                                                                   CZJ CLRSS II  HELLS	 4
                                                                   O NO RSSUrCD flCTIVITIES	19
                                                                      FEDERflL PROORfltl REQUIRED— 20
                                                                         TARGETED TOR FULL PRIMACT
                                                                         IN FY-83
K)
00
A F»d«ral program I* required In thos* Stat««
that hov« not applied for primacy.
                           TARGETED FOR PARTIAL
                           PROGRAM APPROVAL IN FY-83

                           TARGETED FOR FULL PRIMACY
                           INFY-84

-------
             DEVELOPING AND  REVIEWING CRITICAL REGULATIONS

o  AT THE START OF FY 83, THE OFFICE  OF WATER TARGETED THREE MAJOR
   REGULATIONS FOR PROMULGATION  AND THREE FOR PROPOSAL BY THE END OF
   FY 83.

o  THREE MAJOR REGULATIONS WERE  PROPOSED DURING THE YEAR; NONE WERE
   PROMULGATED.

o  THE OFFICE OF WATER REVISED ITS  REGULATORY SCHEDULE DURING THE FOURTH
   QUARTER TO REFLECT THE PRIORITIES  AND APPROACHES OF THE NEW LEADERSHIP

-------
                     DEVELOPING AND REVIEWING CRITICAL REGULATIONS

            OW SCHEDULE  FOR FY 83 PROPOSAL AND PROMULGATION  (REVISED 8/83)
REGULATIONS
CONSTRUCTION
GRANTS
404(b) (1)
GUIDELINES
NATIONAL INTERIM
PRIMARY DRINKING
WATER STANDARDS
BEST CONVENTIONAL
TECHNOLOGY
GENERAL PRETREAT-
MENT ( REMOVAL
CREDITS)
NPDES REGULATIONS
(LITIGATION PKG.)
WATER QUALITY
STANDARDS
PROPOSAL
F.R. DATE
—
4/28/84
9/30/83
12/29/82*
9/28/82*
11/18/82*
10/29/82*
PROMULGATION
F.R. DATE
4/83
11/30/84
9/30/85
4/31/84
1/15/84
3/01/84
9/30/83
STATUS**
OFF SCHEDULE 6 MONTHS;
OMB DELAY.
ON SCHEDULE.

OFF SCHEDULE. SIGNING
IMMINENT, HOWEVER.
ON SCHEDULE.

ON SCHEDULE.

ON SCHEDULE.

OFF SCHEDULE; INFORMAL
NEGOTIATIONS WITH HILL
CONCLUDED. SIGNING
IMMINENT.
GUIDELINES
SLUDGE MANAGEMENT
DRAFT
DATE
8/01/83
FINAL
DATE
10/01/83
STATUS**
OFF SCHEDULE 5 MONTHS;
TASK FORCE ACTIVITIES
REALIGNED.
 * ACTUAL COMPLETION  DATES.
** BASED ON INTERIM MILESTONES.

-------
             DEVELOPING AND  REVIEWING  CRITICAL REGULATIONS
                          EFFLUENT  GUIDELINES
o  TWENTY-NINE EFFLUENT GUIDELINES  WERE COVERED BY THE AUGUST 25, 1982
   COURT-ORDERED SCHEDULE.
   -  4 EFFLUENT GUIDELINES WERE  PROMULGATED ON SCHEDULE
      BEFORE FY 83.
   -  13 GUIDELINES WERE PROMULGATED ON SCHEDULE DURING
      FY 83, MAKING A TOTAL OF  17.
      1 EFFLUENT GUIDELINE WAS  REMOVED FROM THE SCHEDULE.

o  OF THE REMAINING ELEVEN EFFLUENT GUIDELINES:
      6 ARE ON SCHEDULE.
   -  5 ARE BEHIND SCHEDULE.
      —  4 EXPECTED TO MEET  COURT  DEADLINES.
      —  1 COURT IS AWARE OF DELAY.

o  THREE EFFLUENT GUIDELINES  WERE PROPOSED ON OR CLOSE TO SCHEDULE
   DURING THE FOURTH QUARTER:
   -  ALUMINUM FORMING.
   -  COPPER FORMING.
   -  PHARMACEUTICALS.

-------
                    EFFLUENT GUIDELINES SCHEDULE FOR FY  83  PROPOSAL AND PROMULGATION

                                        AS OF SEPTEMBER  30, 1983
**
**
Industry
Aluminum Forming
Battery Manufacturing
Coil Coating (Can
Making Segment)
Copper Forming
Electrical & Electronic
(Phase II)
Foundries
Inorganic Chemicals
(Phase II)
Nonferrous Metals
Forming
Nonferrous Metals
(Phase I)
Nonferrous Metals
(Phase II)
Organic & Plastics Chera
Pesticides
Pharmaceuticals
Plastics Molding and
Forming
PROPOSAL
RMP
(F.R. Date)
11/82
11/82
1/83
11/82
2/83
11/82
9/83

1/83

2/83
11/82
11/82

FY '83
ONDJ FMAMJJAS
PROMULGATED 9/83.

PROMULGATED 8/83.

PROPOSED 9/83 	



•

PROMULGATED 9/83.
•
FY '84
0 N D
	 -^
o
0
^p
	 .^
.... .^i
•^0
^J3
«^
O
^^o

                                                                                 0 Proposal.

                                                                                 o Promulgation

                                                                                 * Court deadlines
                                                                                   modified.

                                                                                ** Court notified of
                                                                                   delays.

-------
                      MEETING PROGRAM  COMMITMENTS

                    CONSTRUCTION GRANTS OBLIGATIONS

o  THE OFFICE OF WATER REVISED  ITS  COMMITMENT FOR THE THIRD AND FOURTH
   QUARTERS TO REFLECT GROSS OBLIGATIONS  INSTEAD OF NET OBLIGATIONS IN
   ORDER TO ELIMINATE THE CONFLICT  CREATED  BY NET OBLIGATION AND
   DEOBLIGATION GOALS.

o  NATIONALLY, ACTUAL OBLIGATIONS WERE 112% OF THE NEW END-OF-YEAR GROSS
   OBLIGATION TARGET.

o  REGIONS I, II, V, VII AND IX MET THEIR NEW GROSS OBLIGATION TARGETS
   WITHIN A +15% TO -10% WINDOW.

o  THE REMAINING REGIONS EXCEEDED THEIR TARGETS BY MORE THAN 15% WITH
   HEADQUARTERS ENCOURAGEMENT.
                      CONSTRUCTION  GRANTS  OUTLAYS

O  NATIONALLY, ACTUAL OUTLAYS WERE  93%  OF  THE PLANNED END-OF-YEAR TARGET,

o  ALL BUT FOUR REGIONS MET THEIR OUTLAY TARGETS WITHIN A +_5% WINDOW.
   REGIONS IV, V, VIII AND X ACHIEVED 81%, 91%,  83% AND 87% OF THEIR
   RESPECTIVE TARGETS.

-------
           CONSTRUCTION GRANT PROGRAM OBLIGATIONS AND OUTLAYS

                          As Of September 30,1983
                  OBLIGATIONS
                 OUTLAYS
                1      2     3
                   QUARTERS
              1      2      3
                 QUARTERS
K)

^
0^
Ul

2
o
TARGET
• Ml MIMItll

ACTUALS

-------
                      MEETING PROGRAM COMMITMENTS

             CONSTRUCTION GRANTS COMPLETIONS AND CLOSEOUTS

o  NATIONALLY, THE OFFICE OF WATER ACHIEVED 99% OF  ITS  END-OF-YEAR TARGET
   FOR PHYSICAL COMPLETIONS.  REGIONS I,  III, V, VI,  VII  AND IX MET OR
   EXCEEDED THEIR TARGETS.  REGIONS II,  IV, VIII AND  X  ACHIEVED 84%, 95%,
   93% AND 85% OF THEIR RESPECTIVE TARGETS.

O  THE OFFICE OF WATER REDUCED ITS THIRD AND FOURTH QUARTER COMMITMENTS
   FOR ADMINISTRATIVE COMPLETIONS TO REFLECT THE IG'S NEW AUDIT CERTIFI-
   CATION PROCEDURES.  NATIONALLY, OW ACHIEVED 96%  OF ITS NEW END-OF-YEAR
   TARGET.  REGIONS III, IV, VI, VII, VIII AND X MET  OR EXCEEDED THEIR
   TARGETS.  REGIONS I, II, V AND IX ACHIEVED 67%,  84%,  85% and 85% OF
   THEIR RESPECTIVE TARGETS.

o  THE OFFICE OF WATER REDUCED ITS THIRD AND FOURTH QUARTER COMMITMENTS
   FOR PROJECT CLOSEOUTS TO REFLECT THE  IG'S NEW AUDIT  SCREENING AND
   CERTIFICATION PROCEDURES.  NATIONALLY, OW ACHIEVED 117% OF ITS NEW
   END-OF-YEAR TARGET.  ALL REGIONS MET  OR EXCEEDED THEIR END-OF-YEAR
   TARGETS.

-------
                CONSTRUCTION GRANT COMPLETIONS/CLOSEOUTS
                            PROJECTS COMPLETED

                          As Of September 30, 1983

(/)
rr
Ul
O
a:
0.
u.
0
O
•y
4L_
1500 -.

1250-

1000-
750-
500-
250-
0-
            Physical
          Completions
Administrative
 Completions
                                                   Project
                                                  Closeouts
    1234

     QUARTERS

DIFFERENT SCALE
                                  1234
                                   QUARTERS
                        1234
                          QUARTERS
Ul
V>
2
O
   Legend
   OB ACTUAL
   ta TAMOCT

-------
                      MEETING PROGRAM COMMITMENTS

                             NPDES  PERMITTING

PERMITTING

o  AT THE START OF FY 83,  EPA'S  NPDES REPERMITTING BACKLOG INCLUDED
   APPROXIMATELY 1,175  MAJOR PERMITS  AND 9,000 MINOR PERMITS.  OF
   THE 1,175 BACKLOGGED MAJOR PERMITS,  20 WERE FOR FEDERAL FACILITIES,
   260 WERE FOR MUNICIPALITIES AND 895  WERE FOR INDUSTRIAL FACILITIES.
   THE OFFICE OF WATER  IS  CURRENTLY GIVING PRIORITY TO REDUCING THE
   BACKLOG OF MAJOR  INDUSTRIAL PERMITS.

o  WHILE NPDES REPERMITTING  PROGRESS  WAS VERY SLOW DURING THE FIRST
   THREE QUARTERS OF FY 83,  THE  REGIONS EXCEEDED THE NATIONAL END-OF-YEAR
   TARGET BY 10%.

O  AT THE START OF FY 83,  THE OFFICE  OF WATER TARGETED 276 MAJOR INDUSTRIAL
   PERMITS FOR REISSUANCE  DURING FY 83.

o  THE REGIONS ISSUED 303  PERMITS  DURING FY 83; 197 OR 60% OF THEM
   WERE ISSUED DURING THE  FOURTH QUARTER.

NEW PERMITS

o  THE REGIONS ISSUED 55 NEW PERMITS  DURING THE FOURTH QUARTER.
   NATIONALLY, THE AVERAGE PROCESSING TIME WAS TEN MONTHS FROM RECEIPT
   OF A COMPLETE APPLICATION TO  PERMIT ISSUANCE, AGAINST A SIX-MONTH
   TARGET.

-------
                          REDUCING REPERMITTING BACKLOG

                             As Of September 30, 1983
               PERMITS TO BE REISSUED
                  1      2      3
                     QUARTERS
       •DIFFERENT SCALES
REDUCTION IN MAJOR INDUSTRIAL
      PERMIT BACKLOG
                                              1000
                                               730
                                               500-
                                               250-
                                                0-4-
      1      2      3
         QUARTERS
o
                                         ACTUALS

-------
                      MEETING  PROGRAM COMMITMENTS

                            NPDES REPERMITTING

o  REGIONS I, IV, VI, IX  AND X EXCEEDED THEIR FOURTH QUARTER  TARGETS.

o  REGIONS IV AND VI  EXCELLED, ACHIEVING 182% AND 124% OF THEIR
   RESPECTIVE END-OF-YEAR TARGETS.

o  REGIONS VIII AND X MET THEIR END-OF-YEAR TARGETS.

o  REGIONS I, II, III AND IX ACHIEVED 94%, 29%, 0%, AND 79% OF  THEIR
   RESPECTIVE END-OF-YEAR TARGETS.

-------
                   REDUCING NPDES REPERMITTING BACKLOG


                         As Of September 30, 1983
K>
UJ
t/>

o
             I    II
IV  V   VI  VII  VIII  IX   X
                                  Legend

                                  •I ACTUAL

                                  EZ3 TARGET

-------
                      MEETING PROGRAM  COMMITMENTS

                     301(h) OCEAN  DISCHARGE  PERMITS

o  PROGRESS IN ISSUING 301(h) OCEAN  DISCHARGE  PERMITS REMAINS QUITE
   SLOW.

O  FOR THE TWENTY-FOUR WAIVER DECISIONS  AND  SIX DRAFT PERMITS ISSUED
   BEFORE FY 83, THE REGIONS WERE  TARGETED TO  ISSUE:
   -  NINE DRAFT PERMITS.
   -  ELEVEN FINAL PERMITS.

o  REGION X WAS THE ONLY REGION  TO ISSUE ANY 301(h) OCEAN DISCHARGE
   PERMITS DURING FY 83:
   -  THREE FINAL PERMITS  DURING THE FOURTH  QUARTER FOR A TOTAL
      OF FOUR FINAL PERMITS.
   -  ONE DRAFT PERMIT DURING THE  FOURTH QUARTER FOR A TOTAL OF
      FOUR DRAFT PERMITS.

o  HEADQUARTERS ISSUED A TENTATIVE WAIVER DECISION DURING THE THIRD
   QUARTER DENYING BOSTON'S WAIVER REQUEST,  BUT FAILED TO ISSUE A
   DECISION FOR SAN FRANCISCO DURING THE FOURTH QUARTER.

-------
   30-i
   20-
    10-
    0
K>
Ul
vt
o
                      301( H ) OCEAN DISCHARGE PERMITS
                           As Of September 30, 1983
                    PERMITS TO BE ISSUED
                               n
                     II
  III
REGIONS
          I
IX
          Legend
         H ACTUAL
         ea TAfton
         O BACKLOG
                                                           BACKLOG REDUCTION
                               70
                               60-
                               50-
                               40-
                               30-
                               20-
                               10-
                                     1234
                                     QUARTERS
                          ACTUAL
                          TARGET

-------
                               ENFORCEMENT
GENERAL

o  THE NATIONAL MUNICIPAL POLICY  IS  CURRENTLY IN DRAFT FORM.  IT HAS
   BEEN APPROVED BY THE ADMINISTRATOR AND IS BEING SUBMITTED TO OMB
   FOR REVIEW.

o  THE FINAL NPDES REGULATION WILL REQUIRE USE OF THE NEW NATIONAL
   DEFINITION OF SIGNIFICANT NON-COMPLIANCE IN REPORTING COMPLIANCE
   RATES.  PROPOSAL IS EXPECTED  IN MAY,  1984, AND FINAL PROMULGATION
   IN MAY, 1985.  OW  IS CONSIDERING  SEPARATING THE DEFINITION FROM THE
   REGULATION AND PROMULGATING IT ON A FASTER SCHEDULE.

o  ALL REGIONS ARE VOLUNTARILY USING THE NEW DEFINITION OF SIGNIFICANT
   NON-COMPLIANCE IN  REPORTING COMPLIANCE.

MUNICIPALS

O  THERE ARE APPROXIMATELY:

   -  3,500 MAJOR MUNICIPAL FACILITIES.
   -  2,400 MAJOR MUNICIPAL FACILITIES ON FINAL EFFLUENT LIMITS.
   -  800 MAJOR 92-500 MUNICIPAL  FACILITIES ON FINAL EFFLUENT LIMITS.

O  NATIONALLY, THE FOURTH QUARTER COMPLIANCE RATE FOR MAJOR 92-500
   MUNICIPALS ON FINAL EFFLUENT  LIMITS WAS 89% AGAINST A 90% TARGET.
   REGIONS I, II AND  X WERE SHORT OF THEIR TARGETS BY 1%, 5% AND 9%
   RESPECTIVELY.  ALL OTHER REGIONS  MET OR EXCEEDED THEIR TARGETS.

o  DURING FY 83, EPA  AND THE STATES  MADE 3,247 COMPLIANCE INSPECTIONS
   OF MAJOR MUNICIPAL FACILITIES  TO  CONFIRM COMPLIANCE REPORTING.
                                    -40-

-------
                  COMPLIANCE RATES FOR MAJOR 92-500 MUNICIPALS
                              ON FINAL EFFLUENT LIMITS

                              As Of September 30, 1983
           lOO-i
K>
5
             0
                                                  TARGET
                                                   90X
                                                            PERCENT OF ALL MAJOR
                                                            MUNICIPALS MEASURED HERE
                            2      3
                            QUARTERS
       NUMBER OF MAJOR 82-300 MUNICIPALS ON FINAL EFFLUENT LIMITS i 826

-------
                              ENFORCEMENT

NON-MUNICIPALS

o  THERE ARE APPROXIMATELY:

   -  4,000 MAJOR NON-MUNICIPAL  FACILITIES.
   -  3,500 MAJOR NON-MUNICIPAL  FACILITIES ON  FINAL EFFLUENT LIMITS.

o  NATIONALLY, THE FOURTH QUARTER COMPLIANCE RATE FOR MAJOR NON-MUNICIPALS
   ON FINAL EFFLUENT LIMITS WAS  91% AGAINST A  94% TARGET.   REGIONS I AND
   III THROUGH VI MET OR EXCEEDED THEIR  TARGETS.   REGIONS  II, VII, VIII,
   IX AND X WERE SHORT OF THEIR  TARGETS  BY 3%  TO  5%.

O  DURING FY 83, EPA AND THE STATES MADE 2,587 COMPLIANCE  INSPECTIONS OF
   MAJOR NON-MUNICIPAL FACILITIES TO  CONFIRM COMPLIANCE REPORTING.

-------
        Ul
        O
        o:
        Ul
        DL
           100n
            25-
                   COMPLIANCE RATES FOR MAJOR NON-MUNICIPALS
                              ON FINAL EFFLUENT LIMITS

                              As Of September 30, 1983
                                                  TARGET
                                                   •4%
                                                           PERCENT OF ALL MAJOR
                                                           NON-MUNICIPALS MEASURED
                                                           HERE
                     1234

                           QUARTERS
u
o
3
O
NUMBER OF MAJOR NON-MUNICIPALS ON FINAL EFFLUENT LIMITS: 3526

-------
                   MANAGING  FOR  ENVIRONMENTAL RESULTS
o  ALL BUT SIX STATES HAVE CONSTRUCTION GRANTS PRIORITY SYSTEMS BASED
   ON MANDATORY WATER-QUALITY PRIORITY  CRITERIA:

   - IN REGION III, THE  DISTRICT  OF  COLUMBIA.
   - IN REGION V, MINNESOTA AND OHIO.
   - IN REGION VI, ARKANSAS AND OKLAHOMA.
   - IN REGION VII, KANSAS.

O  WHILE SOME REGIONS HAVE BEEN WORKING WITH STATES TO IDENTIFY
   PRIORITY WATER BODIES, NATIONAL  INFORMATION IS NOT AVAILABLE.

-------
s
DELEGATION STATUS OF RCRA -  PHASE I

       As Of September 30, 1983
       IV
v    vi
REGIONS
VII  VIII   IX
                                        AUTHORIZED
                                        DRAFT STAGE
                                        NONE

                                        TOTAL
                                        40
                                         5
                                         8
                                        •••••••
                                        53
                                               Legend
                                               NONE
                                            E3 DRAFT STAGE
                                            • AUTHORIZED

-------
                          DELEGATION TO STATES

                  RCRA-C PHASE II STATE AUTHORIZATIONS

O  ELEVEN STATES OBTAINED PHASE II AUTHORIZATION  DURING  FY 1983,  BRINGING
   THE TOTAL TO 16.  THE REVISED FY 1983 TARGET WAS  18.

O  TWENTY-THREE STATES WERE ORIGINALLY SCHEDULED  TO  OBTAIN PHASE  II  BY
   THE END OF FY 1983.  IN MOST CASES, SLIPPAGE OCCURRED DUE TO STATUTORY
   OR REGULATORY CHANGES NEEDED AT THE STATE  LEVEL.   IN  ADDITION,  SEVERAL
   STATES ELECTED TO GO DIRECTLY TO FINAL AUTHORIZATION.

O  TWENTY-FOUR STATES NOW PLAN TO GO DIRECTLY FROM PHASE I TO FINAL
   AUTHORIZATION, INCLUDING ALL STATES IN REGIONS V,  VII AND VIII
   (EXCEPT WY), NY, PR, DE, AL, TN, AR, AK, OR AND ID.   (AT OF THE END
   OF THIRD QUARTER, 15 STATES HAD PLANNED TO GO  DIRECTLY TO FINAL
   AUTHORIZATION.)
                                  -4R-

-------
to
^
0J"
                       DELEGATION STATUS OF RCRA - PRASE il

                              As Of September 30,1983
III   IV
v    vi
REGIONS
VII  VIII  IX
                                                               AUTHORIZED    16
                                                               DRAFT STAGE   14
                                                               NONE         23
                                                               TOTAL
                                                  53
                                                                        lend
                                                                   CD NONE
                                                                   Q9 DRAFT STAGE
                                                                   • AUTHORIZED

-------
                      MEETING PROGRAM COMMITMENTS
                            RCRA PERMITTING


O  THE NUMBER OF RCRA PART B PERMITS ISSUED HAS QUADRUPLED SINCE THE
   END OF THE THIRD QUARTER.  DURING THE LAST  QUARTER,  SIXTY-TWO PERMITS
   WERE ISSUED, BRINGING THE FY 83 TOTAL TO 77.  THE  MAJORITY OF PERMITS
   ISSUED WERE IN REGION IX WITH 21 AND REGION V WITH 18.   EIGHTY-ONE
   PERMITS HAVE BEEN ISSUED SINCE THE INCEPTION OF  THE  PROGRAM IN FY 82.

O  THE FIRST TWO DENIALS OF RCRA PART B PERMITS OCCURRED DURING FOURTH
   QUARTER.  REGION IV TURNED DOWN AN APPLICATION BY  CITY  INDUSTRIES
   OF FLORIDA AND THE STATE OF VIRGINIA DENIED AN APPLICATION BY PRILLMAN
   CORPORATION.

O  EXISTING FACILITIES (ACTIVITY SINCE INCEPTION OF PROGRAM IN FY 1983)

   -  EPA HAS NOW CALLED IN 673 STORAGE AND TREATMENT APPLICATIONS.
      MOREOVER, THE STATES HAVE CALLED IN  1056 APPLICATIONS FOR A
      TOTAL OF 1729.  (FY 1983 TARGET WAS  675.)  OF THE PERMITS CALLED
      IN, THE STATES AND EPA HAVE RECEIVED 670 PERMIT APPLICATIONS.
      FIFTY-TWO PERMITS FOR EXISTING STORAGE AND TREATMENT FACILITIES
      WERE ISSUED DURING THE FOURTH QUARTER, BRINGING THE  TOTAL TO 59
      (25 BY EPA AND 34 BY STATES).

   -  EPA HAS CALLED IN 108 INCINERATOR FACILITY APPLICATIONS.  THE
      STATES HAVE CALLED IN AN ADDITIONAL  48 APPLICATIONS  FOR A TOTAL
      OF 156.  (FY 1983 TARGET WAS 136.)   OF THE PERMITS CALLED IN,
      THE STATES AND EPA HAVE RECEIVED 81  APPLICATIONS.  NO PERMITS
      FOR EXISTING INCINERATOR FACILITIES  HAVE BEEN ISSUED YET.

   -  EPA HAS CALLED IN 275 LAND DISPOSAL  APPLICATIONS.  THE STATES
      HAVE CALLED IN ANOTHER 24 FOR A TOTAL OF 299.   (FY 1983 TARGET
      WAS 247.)  OF THE PERMITS CALLED IN, THE STATES AND  EPA HAVE
      RECEIVED 126 APPLICATIONS.  NO PERMITS FOR EXISTING  LAND DISPOSAL
      FACILITIES HAVE BEEN ISSUED YET.

-------
                  MEETING PROGRAM COMMITMENTS  (Cont.)
                            RCRA PERMITTING

o  NEW FACILITIES OR EXPANSIONS (ACTIVITY SINCE  INCEPTION Of PROGRAM IN
   FY 1982):

   -  EPA RECEIVED 14 STORAGE AND TREATMENT  APPLICATIONS DURING FOURTH
      QUARTER, BRINGING THE TOTAL TO  96.  SIX  PERMITS  WERE ISSUED DURING
      THE QUARTER, BRINGING THE TOTAL TO 14.
   -  EPA RECEIVED 4 INCINERATION APPLICATIONS DURING  FOURTH QUARTER,
      BRINGING THE TOTAL TO 19.  THREE PERMITS WERE  ISSUED DURING THE
      QUARTER, BRINGING THE TOTAL TO  6.
   -  EPA RECEIVED 5 LAND DISPOSAL APPLICATIONS  DURING FOURTH QUARTER,
      BRINGING THE TOTAL TO 20.  ONE  PERMIT  WAS  ISSUED DURING THE
      QUARTER, BRINGING THE TOTAL TO  2.

o  BASED ON EXPERIENCE TO DATE, AVERAGE PERMIT PROCESSING TIMES ARE:

   -  1.6 CALENDAR YEARS* FOR EXISTING STORAGE AND TREATMENT FACILITIES.
   -  1.3 CALENDAR YEARS FOR NEW OR EXPANDED STORAGE AND TREATMENT
      FACILITIES.
   -  1.9 CALENDAR YEARS FOR NEW OR EXPANDED INCINERATOR FACILITIES.
   -  1.7 CALENDAR YEARS FOR NEW OR EXPANDED LAND DISPOSAL FACILITIES.

*BASED ON 220 WORK DAYS PER YEAR.

-------
                      MEETING PROGRAM COMMITMENTS

                      SUPERFUND REMOVAL ACTIVITIES

o  BUILDING ON ITS RECORD-BREAKING THIRD QUARTER EFFORTS,  OERR CONTINUED
   TO EXPAND ITS REMOVAL PROGRAM EFFORTS DURING FOURTH  QUARTER.
   THIRTY-FIVE IMMEDIATE REMOVAL ACTIONS TO STABILIZE CONDITIONS  AT
   UNCONTROLLED SITES WERE INITIATED, BRINGING THE  FY 1983 TOTAL  TO
   111.  (DURING FY 1982, ONLY 47 IMMEDIATE REMOVALS WERE  INITIATED.)
   THIRTY-FIVE IMMEDIATE REMOVALS WERE ALSO COMPLETED DURING FOURTH
   QUARTER, BRINGING THE TOTAL FY 1983 COMPLETIONS  TO 92.

o  REGIONAL OBLIGATIONS FOR REMOVAL ACTIVITIES MORE THAN DOUBLED  DURING
   THE FOURTH QUARTER.  $17.5 MILLION WAS OBLIGATED FOR REMOVAL ACTIONS,
   BRINGING THE FY 1983 TOTAL TO $24.7 MILLION.

O  A TOTAL OF 8 PLANNED REMOVALS WERE INITIATED AND 6 COMPLETED DURING
   FY 1983.  THE FY 1983 TARGETS WERE 7 AND 5 RESPECTIVELY.

O  EPA ALSO PARTICIPATED IN 123 OTHER ON-SCENE RESPONSE ACTIVITIES.

-------
SUPERFUND REMOVAL ACTIVITIES FOR FY 83
       As Of September 30, 1983
INITIATED
COMPLETED
1DU-
a: 100~
LU
CD
fj|
Z 50-

0-1
lie
2 ':(. •'«''/ .''•">• -
oj*
2
O
1DU-
/
/
50-
/
>.n""" • ^^^^•^^••^•^'^
FT i 1 1 U^
1234

X*
,»»*
%xa"
.^'*'%*
	 • • 1
1234
/£, QUARTER , , ,, , QUARTER , ., ^
/^ ^^ 7i» I' ' '» "31/ o / '»-<
' 3 7 ^ • IMMEDIATE REMOVAlf r T fe
• PLANNED REMOVAL


-------
                      MEETING PROGRAM COMMITMENTS

                     SUPERFUND REMEDIAL ACTIVITIES


o  DURING THE FOURTH QUARTER, $41.8 MILLION WAS  OBLIGATED FOR REMEDIAL
   ACTIVITIES.  THIS BRINGS THE TOTAL FY  1983  REMEDIAL FUNDS OBLIGATED
   TO $86.7 MILLION.  EPA'S FY 1983 OBLIGATION TARGET WAS $80 MILLION.

o  THE FOURTH QUARTER FUNDS WERE OBLIGATED  IN  ACCORDANCE WITH THE
   REVISED FY 1983 REMEDIAL TARGETS:

   -  $22.6 MILLION FOR REMEDIAL INVESTIGATION/FEASIBILITY STUDIES.
      61 NEW SITES WERE STARTED, BRINGING THE  FY 1983 TOTAL TO 87
      SITES.  THIS EXCEEDS THE FY  1983 TARGET  OF 75  SITES BY 12.

   -  $1.9 MILLION FOR ENGINEERING DESIGNS.  6 NEW SITES WERE STARTED,
      BRINGING THE FY 1983 TOTAL TO 9.  THE END-OF-YEAR TARGET CALLED
      FOR ENGINEERING DESIGNS AT 12 NEW SITES.

   -  $13.2 MILLION FOR REMEDIAL IMPLEMENTATION  ACTIONS.  5 NEW SITES
      WERE STARTED.  THE END-OF-YEAR TARGET CALLED FOR REMEDIAL ACTIONS
      AT 6 NEW SITES.

   -  $4.1 MILLION WAS ALSO OBLIGATED FOR INITIAL REMEDIAL MEASURES.
      11 NEW SITES WERE STARTED, BRINGING THE  FY 1983 TOTAL TO 18.  THE
      END-OF-YEAR TARGET CALLED FOR 16 IRM'S AT  NEW  SITES.

o  A TOTAL OF 29 STATE COOPERATIVE AGREEMENTS  WERE AWARDED DURING FY 1983
   AND 21 EXISTING ONES WERE AMENDED.  THIS GIVES THE STATES THE PROJECT
   LEAD FOR 39.5% OF THE SUPERFUND REMEDIAL DOLLARS  OBLIGATED DURING
   FY 1983.

o  SINCE THE INCEPTION OF THE SUPERFUND PROGRAM, 16,307 UNCONTROLLED
   SITES HAVE BEEN IDENTIFIED, 6,850 SITE INSPECTIONS HAVE BEEN COMPLETED,
   1,929 PRELIMINARY INVESTIGATIONS HAVE  BEEN  COMPLETED AND 5 SITES ON
   THE NATIONAL PRIORITIES LIST HAVE BEEN CLEANED UP (2 UNDER THE
   REMOVAL PROGRAM, 1 UNDER THE REMEDIAL  PROGRAM, 1  WITH SECTION 311
   FUNDS, AND 1 AS A RESULT OF PRIVATE PARTY CLEANUP).  IN ADDITION,
   REMEDIAL WORK IS UNDERWAY AT 142 SITES.

-------
                                FY 83 SUPERFUND
                         SITE REMEDIAL ACTIVITIES INITIATED

                             As Of September 30,1983
       Remedial Investigations/
         Feasibility Studies
                             Engineering
                               Designs
                                     Remedial
                                      Actions
   lOO-i
        ••
LJ

GO
u.
O
 K>

 s
 Ul
 trt
 O
                      20-
            QUARTERS
               jo   ^
7S
 A ACTUAL SITES - FUNOS OBL
•• DIFFERENT SCALE
                            20-1
           1    2    3
           QUARTERS
                                    o
                                               10 H
                                                      1    2    3

                                                      QUARTERS
                                                      £>    V   7

-------
                              ENFORCEMENT

                     SUPERFUND ENFORCEMENT ACTIVITY

o  AS IN THE THIRD QUARTER, SUPERFUND ENFORCEMENT  ACTIONS HAVE CONTINUED
   TO INCREASE DURING FOURTH QUARTER.

   -  30 ADMINISTRATIVE ORDERS WERE  ISSUED,  BRINGING THE FY 1983 TOTAL
      TO 161.  13 OF THE ORDERS WERE ISSUED  ON  CONSENT AND 17 WERE
      ISSUED UNILATERALLY.
   -  996 NOTICE LETTERS WERE ISSUED FOR 37  SITES, BRINGING THE FY 1983
      TOTAL TO 2181 NOTICE LETTERS FOR  82 SITES.

O  NEGOTIATIONS ARE UNDERWAY WITH RESPONSIBLE PARTIES AT 92 SITES.

o  EPA OBTAINED PRIVATE PARTY CLEANUPS  WORTH $19.6 MILLION AT 12 SITES
   DURING FOURTH QUARTER.  THIS BRINGS  THE FY 1983 TOTAL TO $87.6
   MILLION AT 23 SITES.  A HIGHLIGHT DURING  THE LAST QUARTER WAS THE
   $10 MILLION SETTLEMENT AT THE FMC FACILITY IN FRIDLEY, MINNESOTA —
   EPA'S TOP RATED NPL SITE.

O  ONE COST RECOVERY ACTIOJN WORTH $67,000 WAS NEGOTIATED DURING THE
   FOURTH QUARTER.  THIS BRINGS THE  FY  1983  TOTAL  TO $14.4 MILLION AT
   4 SITES.
                                  -56-

-------
          SUPERFUND ENFORCEMENT ACTIVITY FOR FY 83
                   As Of September 30, 1983
    200-1
                                               161
     150-
  Ul
100-
     50-
K>

^
of
Ul
CO
2
o
               82
                       92
                               23
        S$?    &
        :>&?     \&X
               3?

-------
                              ENFORCEMENT

                        RCRA ENFORCEMENT ACTIVITY

EPA DATA

O  THE REGIONS COMPLETED 1058 RCRA FACILITY  INSPECTIONS  DURING FOURTH
   QUARTER, BRINGING THE FY 1983 TOTAL TO  3471.  THE  TARGET FOR THE
   YEAR WAS 3954.  REGIONS III AND VI EXCEEDED THEIR  TARGETS FOR THE
   FISCAL YEAR.

O  ONE HUNDRED TWENTY-SEVEN HANDLERS WERE  FOUND  TO  HAVE  CLASS I VIOLATIONS
   DURING THE FOURTH QUARTER.

O  THE REGIONS ISSUED COMPLIANCE ORDERS TO 58 HANDLERS WITH CLASS I
   VIOLATIONS.

O  TWENTY-EIGHT HANDLERS WITH CLASS I VIOLATIONS WERE RETURNED TO
   COMPLIANCE THROUGH FINAL ORDERS.  REGION  VII  WAS RESPONSIBLE FOR 9.


STATE DATA

O  THIRD QUARTER DATA RECEIVED FROM MOST STATES  INDICATE THAT:

   -  3849 INSPECTIONS WERE CONDUCTED, BRINGING  THE FY  1983 TOTAL (AS
      OF THE END OF THE THIRD QUARTER) TO  11,373.   1070  OF THE THIRD
      QUARTER INSPECTIONS WERE IN REGION III AND 797  WERE IN REGION IV.

   -  1118 HANDLERS WERE DETECTED WITH RCRA  VIOLATIONS.   308 OF THOSE
      WERE IN REGION IV AND 306 WERE IN REGION VI.

   -  136 FORMAL ADMINISTRATIVE ORDERS DIRECTING FACILITY COMPLIANCE
      WERE ISSUED.

-------
   V)
   c
   o
   9
   a.
  O

   O



   |

  O
     4000-1
     3000-
     2000-
1000-
          RCRA ENFORCEMENT ACTIVITY FOR FY 1983

                   As Of September 30, 1983

          INSPECTIONS                              CLASS I VIOLATORS

                                         150-1
            ACTUAL
          COMPLIANCE ORDERS ISSUED
                 CLASS I
      lOO-i
K>

s
Ul
CO
2
Q_
   a
   o
                                      =5 100-
                                         50-
                                       o
                                      X
                                      «*-
                                      o

                                       o
                                                     1234
                                              RETURNED TO COMPLIANCE
                                                    CLASS I

-------
               OFFICE OF PESTICIDES AND  TOXIC  SUBSTANCES
                           TABLE OF  CONTENTS
        GOAL                                                  PAGE
MEETING PROGRAM COMMITMENTS  	   62
DEVELOPING AND REVIEWING CRITICAL -REGULATIONS  	   75
ENFORCEMENT 	   76
IMPROVING THE QUALITY OF EPA SCIENCE  	   82
                                   -61-

-------
                      MEETING PROGRAM COMMITMENTS

                  PESTICIDE REGISTRATION  APPLICATIONS

CURRENT APPLICATIONS

o  TIMELY PERFORMANCE IN FY 83  DECLINED FROM NEAR  PERFECT IN THE FIRST
   TWO QUARTERS TO ONLY 70% OF  ALL APPLICATIONS  REVIEWED WITHIN
   ADMINISTRATIVE SCHEDULES IN  THE FOURTH QUARTER.

o  THE DECREASE IN FOURTH QUARTER PERFORMANCE WAS  DUE TO TWO FACTORS
   WHICH RESULTED IN ONLY 57% OF OLD CHEMICAL REVIEWS BEING REVIEWED
   WITHIN THE SCHEDULE:

   -  THE NUMBER OF APPLICATIONS PENDING  ACTION  DOUBLED IN THE
      FOURTH QUARTER; AND
   -  RESOURCES WERE DIVERTED TO THE CLOSING OUT OF 579 ACTIONS
      BACKLOGGED IN THE THIRD QUARTER BECAUSE OF THE CITE-
      ALL COURT CASE.

BACKLOG

O  OPP FELL FAR SHORT OF THE END-OF-YEAR  TARGET.  THE BACKLOG OF UNPROCESSED
   APPLICATIONS INCREASED FROM  69 TO 140  IN THE  FOURTH QUARTER.

o  OPP ELIMINATED MUCH OF THE ACTUAL THIRD QUARTER BACKLOG OF 645
   APPLICATIONS WHICH WERE THE  RESULT OF  THE CITE-ALL COURT CASE.
                                 -62-

-------
                      PESTICIDE REGISTRATION APPLICATIONS


                  PERCENT OF FY-83 APPLICATIONS COMPLETED
                          WITHIN APPLICABLE TIMETABLE


                           As Of September 30, 1983
K)
UI

3E
O
       UJ
       o
       o:
       bJ
TOTAL
PROCESSED :
                      2      3

                      QUARTERS
4357
4634
                            2905
                                                TARGET
5811


 •SEE HIGHLIGHT
                                                      SIZE OF BACKLOG*
                                                   15(H
                                                         75-
                                                           82   1    234

                                                               QUARTERS
                                                               NO. OF PENDING
                                                            APPLICATIONS WHOSE TIME
                                                            LIMIT HAS BEEN EXCEEDED
                                                             Legend

                                                              ACTUAL
                                           TARGET
                                           *i* t»•**»••••

-------
                      MEETING PROGRAM COMMITMENTS

                  PESTICIDE FFDCA TOLERANCE  PETITIONS

CURRENT PETITIONS

o  PERFORMANCE AGAINST THE TARGET DECLINED IN  THE  SECOND HALF OF FY 83
   AFTER A STRONG SECOND QUARTER PERFORMANCE.

o  OPP REVIEWED 76% OF THE PETITIONS WITHIN  THE  STATUTORY DEADLINE
   IN THE FOURTH QUARTER.  WHILE THIS REPRESENTS A DECLINE IN TIMELY
   PERFORMANCE, THERE WAS AN INCREASE IN THE TOTAL NUMBER OF
   APPLICATIONS PROCESSED.

BACKLOG

O  THE BACKLOG OF UNPROCESSED PETITIONS CONTINUED  TO INCREASE IN THE
   FOURTH QUARTER AND HAS NOW EXCEEDED THE FY82  LEVEL.   OPP COMPLETED
   FY 83 WITH 62 BACKLOGGED PETITIONS AGAINST  A  TARGET  OF 14.  THE
   INCREASE IN THE BACKLOG IS DUE IN PART TO UNRESOLVED SCIENCE POLICY
   ISSUES AND UNCOMPLETED INTRA-AGENCY DATA  REVIEWS.

-------
                           FFDCA TOLERANCE PETITIONS

                     PERCENT OF FY-83 PETITIONS COMPLETED
                           WITHIN STATUTORY TIME LIMIT

                            As Of September 30,1983
       100-1
K>

s
UJ
to
o
    Ld
    O
    o:
    LJ
    o_
TOTAL
PROCESSED:
                        2     3
                       QUARTERS
109
106
133
                                             TARGET
                                                           SIZE OF BACKLOG
                                                   60-i


                                                   45-


                                                   30-


                                                   15-
                                                          82   1   2   3   4
                                                               QUARTERS
                                                              NO. OF PENDING
                                                             PETITIONS WHOSE TIME
                                                            LIMIT HAS BEEN EXCEEDED
                                      Legend
                                       ACTUAL
                                                         TAROET
                                                         • •*••••!•« I ••

-------
                      MEETING PROGRAM  COMMITMENTS

                   PESTICIDE EXPERIMENTAL  USE PERMITS

CURRENT APPLICATIONS

o  OPP PROCESSED 82% OF THE APPLICATIONS WITHIN THE ADMINISTRATIVE SCHEDULE,
   THIS REPRESENTS A NOTICABLE  DECLINE IN  PERFORMANCE SINCE THE THIRD
   QUARTER, PARTICULARLY WHEN RECOGNIZING  THE MARKED DROP IN THE NUMBER OF
   APPLICATIONS PROCESSED.

BACKLOG

o  THE BACKLOG INCREASED TO 37  APPLICATIONS IN THE FOURTH QUARTER.

O  THE BACKLOG HAS NOW EXCEEDED THE  BEGINNING-OF-YEAR FY 82 LEVEL.

-------
                     EXPERIMENTAL USE PERMIT APPLICATIONS

                          PERCENT PROCESSED ON TIME

                            As Of September 30, 1983
          100 -i
K)
or
UJ
to
TOTAL
PROCESSED :
                           2      3

                          QUARTERS
                                                TARGET       SIZE OF BACKLOG
                                                        40-,
                                                         20-
                                                                       •    I
                                                           82   1    234
                                                               QUARTERS
                                                            NO. OF APPLICATIONS
                                                             WHOSE TIME LIMIT
                                                            HAS BEEN EXCEEDED
                                                         Legend
                                                          ACTUAL
120
                            134
77
TARGET
• ««*• «* ••••«•

-------
                      MEETING PROGRAM COMMITMENTS

                    PESTICIDE REGISTRATION  STANDARDS

o  OPP WAS SUCCESSFUL IN MEETING  ITS FY  83  COMMITMENT IN THE REGISTRATION
   STANDARDS PROGRAM.  TWENTY-THREE REGISTRATION STANDARDS WERE ESTABLISHED
   IN FY 83, ONE MORE THAN THE TARGET FOR THE  YEAR.

o  OPP MET THE TARGET OF SEVEN REGISTRATION STANDARDS TO BE ESTABLISHED
   IN THE FOURTH QUARTER.

O  OPP HAS RESPONDED TO THE OMSE  MANAGEMENT REVIEW OF REGISTRATION
   STANDARDS FOLLOW-UP ACTIVITIES AND IS TAKING ACTION TO ADDRESS THE
   ISSUES RAISED IN THE REPORT.

-------
                    PESTICIDE REGISTRATION STANDARDS

              CUMULATIVE NUMBER OF STANDARDS ESTABLISHED

                        As Of September 30, 1983
                25 n
K)
to
o
 2      3
 QUARTERS
Legend
B ACTUAL
  TARGET
                                   -fiQ-

-------
                      MEETING PROGRAM  COMMITMENTS

                   PESTICIDE SPECIAL REVIEW DECISIONS

O  EIGHT SPECIAL REVIEWS WERE COMPLETED IN FY  83, MEETING THE COMMITMENT
   WHICH WAS CHANGED FROM THE PREVIOUS TARGET  OF THIRTEEN.

O  OPTS MET ITS REVISED TARGET OF  FOUR SPECIAL REVIEWS IN THE FOURTH
   QUARTER:

   -  AN EMERGENCY SUSPENSION AND  A CANCELLATION NOTICE WERE
      ISSUED FOR ETHYLENE DIBROMIDE (EDB);
   -  A VOLUNTARY CANCELLATION RESULTED FROM THE REVIEW OF
      NITROFEN (TOK);
   -  A CANCELLATION WAS ISSUED  FOR MOST USES  OF STRYCHNINE; AND
   -  LINDANE WAS RETURNED  TO THE  REGISTRATION PROCESS WITH
      CERTAIN USE RESTRICTIONS AND LABEL CHANGES.
                                    -70-

-------
                    PESTICIDE SPECIAL REVIEW DECISIONS

                CUMULATIVE NUMBER OF DECISIONS COMPLETED

                         As Of September 30, 1983
                20-i
K>
Ul
V)

o
             O
             (/)

             IjJ
             o
             U.
             O
10-
                         m
               2      3
               QUARTERS
              Legend
             Bi ACTUAL
             ZZJ TARGET

-------
                      MEETING PROGRAM COMMITMENTS
      INTERAGENCY TESTING COMMITTEE (ITC) DESIGNATIONS—NEW LISTS

o  OTS ACHIEVED ALL TARGETS FOR THE-REVIEW OF  ITC  DESIGNATIONS  IN  FY 83,

o  OTS ACHIEVED THE FOURTH QUARTER TARGET FOR  TAKING ACTION ON  THE 11TH
   ITC LIST.

o  ELEVEN PRELIMINARY DECISIONS WERE MADE:
   -  FOUR NEGOTIATED TESTING AGREEMENTS WERE  INITIATED;  AND
   -  SEVEN CHEMICALS WILL NOT REQUIRE TESTING.

o  FINAL DECISIONS FOR THIS LIST WILL BE ISSUED  IN  FY  84.

-------
                    MEETING PROGRAM  COMMITMENTS
            SUMMARY OF OTS ACTIONS  ON  EXISTING CHEMICALS
    ITEM
   DATE DUE
           STATUS
PCB REMAND
UNCONTROLLED
SYSTEMS
COURT-ORDERED
QUARTERLY STATUS
REPORT:  9/83
ON SCHEDULE; SUBMITTED TO U.S.
COURT OF APPEALS 9/29/83.
RULEMAKING IS ON SCHEDULE.
FORMALDEHYDE
INTERAGENCY
AGREEMENT
QUARTERLY STATUS
REPORT TO OMSE:
9/83
ON SCHEDULE; CONSENSUS WORKSHOP
SCHEDULED MET ON 10/3-10/6 TO
DISCUSS EXISTING DATA AND
FUTURE RESEARCH NEEDS.
FORMALDEHYDE
CANCER CASE-
CONTROL STUDY
STUDY
QUESTIONNAIRE:
2/83
BEHIND SCHEDULE; APPROVED BY
OMB ON 9/2/83 AFTER SIX MONTH
DELAY.
TSCA SECTION 4(F)
RULE FOR METHYLENE
DIANILINE (MDA)
PUBLISH ANPR IN
FEDERAL REGISTER;
9/83
ON SCHEDULE; ANPR PUBLISHED
ON 9/20/83.

-------
           DEVELOPING AND  REVIEWING CRITICAL REGULATIONS

             SUMMARY OF  FOURTH QUARTER OPTS ACTIVITIES
    ITEM
    DATE DUE
           STATUS
PROMULGATION OF FIFRA
SECTION 3 REGULATIONS
FOR PESTICIDE
REGISTRATION
STEERING COMMITTEE
REVIEW: 9/30/83.
BEHIND SCHEDULE TWO MONTHS:
IN REVIEW AT OD LEVEL.
REVIEW OF OPP POLICY
STATEMENT ON
POLYNUCLEAR AROMATICS
FORWARD RECOMMENDA-
TIONS TO AA/OPTS:
7/83.
ON SCHEDULE; APPROVED  BY
ACTING AA/OPTS ON 8/23/83.
TSCA GENERIC EXEMPTION
RULE FOR SITE
LIMITED/LOW VOLUME
INTERMEDIATES
OBTAIN ADMINISTRA-
TOR'S SIGNATURE:
7/20/83.
BEHIND SCHEDULE; CURRENTLY
IN OMB REVIEW AND  EXPECTED
TO BE COMPLETED BY  10/31/83
TSCA GENERIC EXEMPTION
RULE FOR POLYMERS
COMPLETE OMB
REVIEW:  9/29/83.
BEHIND SCHEDULE; CURRENTLY  IN
OMB REVIEW AND EXPECTED  TO
BE COMPLETED BY 10/31/83.
                                 -75-

-------
                               ENFORCEMENT

           FIFRA COMPLIANCE  MONITORING  —  FEDERAL INSPECTIONS

O  THE END-OF-YEAR TARGETS WERE  FAR  EXCEEDED IN ALL CATEGORIES BECAUSE
   THE DEMAND IN THE REGIONS FOR ALL TYPES OF INSPECTIONS EXCEEDED
   HEADQUARTERS-ASSIGNED TARGETS.

O  OPTS HAS INDICATED THAT IN FY 84  THE MAS TARGETS WILL MORE
   REALISTICALLY REFLECT REGIONAL  ACTIVITY.

o  IN FY 83 299 SIGNIFICANT  VIOLATIONS  RESULTED IN THE ISSUANCE OF
   ADMINISTRATIVE CIVIL COMPLAINTS OR CRIMINAL REFERRALS.  TWO HUNDRED
   THREE FY 83 ADMINISTRATIVE CASES  AND TWO CRIMINAL CASES REMAIN
   OPEN.  ONLY 2 OF 117 OPEN ADMINISTRATIVE CASES IN THE FY 80-82
   BACKLOG WERE CLOSED IN THE FOURTH QUARTER.
                                   -76-

-------
     FIFRA COMPLIANCE MONITORING INSPECTIONS AND ENFORCEMENT ACTIONS
   ••M^.

   O
K)
of
UJ
to
      900-^
                           COMPLETED BY REGIONS
                          As Of September 30,1983
                                                             1234
                                                               QUARTER
                                                           tZ3 ACTIONS INITIATED
                                                           • ACTIONS CLOSED
                  TYPE OF INSPECTION
   Legend
ACTUAL
END-OF-YEAR TARGET

-------
                              ENFORCEMENT

                 TSCA COMPLIANCE  MONITORING INSPECTIONS

o  THE REGIONS COLLECTIVELY  EXCEEDED.THE AGENCY'S END-OF-YEAR TARGET
   FOR TSCA INSPECTIONS.

o  THE TARGET OF 75 ASBESTOS  INSPECTIONS WAS SUPER EXCEEDED:  ASBESTOS
   INSPECTION RECORDS WERE REVIEWED  IN  207  LOCAL EDUCATION AGENCIES.

o  ADMINISTRATIVE ACTIONS WERE  INITIATED TO ADDRESS 103 SIGNIFICANT
   VIOLATIONS IN THE FOURTH QUARTER  FOR A TOTAL OF 294 ADMINISTRATIVE
   ACTIONS AND 8 REFERRALS TO DOJ IN FY 83.  NINETY-SEVEN PERCENT OF
   THE VIOLATIONS OCCURRED IN THE PCB INSPECTION PROGRAM.  ONE HUNDRED
   TWENTY-TWO ADMINISTRATIVE  CASES WERE CLOSED DURING FY 83.  TWENTY-
   THREE CASES REMAIN IN THE  FY 80-82 BACKLOG.
                                   -78-

-------
                  TSCA COMPLIANCE MONITORING INSPECTIONS
                         AND ENFORCEMENT ACTIONS
                           COMPLETED BY REGIONS

                         As Of September  30, 1983
     2400-
                                         END-OF-YEAR
                                           TARGET
O
2      3
QUARTER
                                                     o
                                                     55
                                      1234
                                        QUARTER


                                        Legend
                                    EZI ACTIONS INITIATED
                                    Hi ACTIONS CLOSED
                                      -70-

-------
                              ENFORCEMENT

            REGIONAL TSCA COMPLIANCE MONITORING INSPECTIONS

O  MOST REGIONS MET OR EXCEEDED THEIR TSCA INSPECTION TARGETS  IN  FY  83

   -  REGIONS I AND X FINISHED THE YEAR AT ALMOST 50% ABOVE THEIR
      TARGETS; AND
   -  REGION V INITIATED CASES AGAINST 122 SIGNIFICANT VIOLATORS.
      THIS PERFORMANCE ACCOUNTS FOR 41% OF THE NATIONAL TOTAL.

O  PERFORMANCE SHORTFALLS OCCURRED IN REGIONS II AND IV:

   -  REGION II COMPLETED ONLY 53% OF ITS FY 83 ANNUAL INSPECTION
      TARGET, BUT PERFORMANCE IMPROVED GREATLY IN THE FOURTH QUARTER
      WHEN 100 OF THE TOTAL OF 161 INSPECTIONS WERE COMPLETED; AND
   -  REGION IV COMPLETED 200 OF ITS TARGET OF 250 FY 83  INSPECTIONS.
                                  -80-

-------
               REGIONAL TSCA COMPLIANCE MONITORING INSPECTIONS

                            As Of September 30, 1983
K>

<
Of

ft

o
       Q
           500-
         SIGNIRCANT
         VIOLATORS
         ADDRESSED:  9
                       II    III
         IV   V    VI   VII   VIII   IX   X

             REGIONS
32   12    16   122   29   31
15
13    15
                                  Legend
                             M ACTUAL
                             E3 END-OF-YEAR TARGET

-------
                  IMPROVING THE QUALITY OF EPA  SCIENCE

                      QUALITY ASSURANCE ACTIVITIES
OPP
o  THE ANNUAL REPORT ON FY 83 QUALITY ASSURANCE  SYSTEMS  AUDITS  WAS
   COMPLETED AND TRANSMITTED TO ORD  IN THE FOURTH  QUARTER.

OTS

o  TWO OTS QUALITY ASSURANCE PROJECTS WERE COMPLETED  ON  OR  AHEAD OF
   SCHEDULE:
   -  A QUALITY ASSURANCE PROJECT PLAN (QAPP) WAS  COMPLETED
      FOR PCB DISPOSAL SUPPORT ACTIVITIES; AND
   -  THE ANNUAL REPORT ON FY 83 QA  AUDITS WAS COMPLETED AND
      TRANSMITTED TO ORD ONE MONTH AHEAD OF  SCHEDULE.

o  A QUALITY ASSURANCE PROJECT PLAN  (QAPP) FOR A PCB  EXPOSURE ASSESSMENT
   WAS NOT COMPLETED.  OTS CHOSE NOT TO PERFORM  THIS  EXPOSURE ASSESSMENT.
   OMSE WAS NOT NOTIFIED QF THIS CHANGE IN COMMITMENT.

-------
                        OFFICE OF ADMINISTRATION
                      MEETING PROGRAM COMMITMENTS
     ITEM
       STATUS
CATALOGUE OF MODEL PERFORMANCE
STANDARDS.
COMPLETED ON SCHEDULE,
FINAL REPORT:  ELECTRONIC MAIL
FEASIBILITY STUDY.
COMPLETED ONE MONTH BEHIND
SCHEDULE.  STUDY CONCLUDED
THAT SUBSTANTIAL COST SAVINGS
($680,000 THE FIRST YEAR) WERE
POSSIBLE OVER OTHER CONVENTINAL
COMMUNICATION METHODS.

-------
                      MEETING PROGRAM COMMITMENTS

                     DELINQUENT ACCOUNTS  RECEIVABLE

O  OA EXCEEDED ITS TARGET OF 15 PERCENT FOR  REDUCING THE NUMBER OF
   DELINQUENT ACCOUNTS RECEIVABLE.
   - BEGINNING BALANCE OF 585 ITEMS WAS REDUCED TO 452 ITEMS
     FOR A 23 PERCENT REDUCTION.
   - NUMBER OF DELINQUENT ACCOUNTS RECEIVABLE  DUE  GRANTS
     REFUNDS UNDER APPEAL INCREASED TO 122 BY  THE  END OF THE
     FOURTH QUARTER.

O  TOTAL DOLLARS IN DELINQUENT ACCOUNTS RECEIVABLE DECREASED DURING
   THE FOURTH QUARTER.

O  AT YEAR END, THE MAJORITY OF DELINQUENT ACCOUNTS  RECEIVABLE INVOLVE
   GRANT REFUNDS UNDER APPEAL OR AWAITING COLLECTION IN THE CLAIMS
   OFFICE.  THIS ITEM WILL NOT BE TRACKED IN FY 84.

-------
                REDUCTION OF DELINQUENT ACCOUNTS RECEIVABLE
                              ( OVER 90 DAYS )

                          As Of September 30, 1983
                DOLLAR AMOUNT
 NUMBER OF ACCOUNTS
K)
U»
to
3E
O
1234
    QUARTER

 ACTUAL
• TOTAL	
                                          BOO
                                          600
                                          400
                                          200
  1      2     3
      QUARTER

TARGET
> M7AK	

-------
                OFFICE OF POLICY, PLANNING  &  EVALUATION
                      MEETING PROGRAM COMMITMENTS
      ITEM
      STATUS
FINAL REPORT - REGULATORY
REFORM STRATEGY FOR WATER.
1-1/2 MONTHS BEHIND SCHEDULE
DUE TO CONTRACTOR DELAYS AND
REQUESTS FOR ADDITIONAL ANALYSES,
1981 COST OF CLEAN AIR
AND CLEAN WATER REPORT
TO CONGRESS.
EIGHT MONTHS BEHIND SCHEDULE
DUE TO REVISIONS REQUESTED BY
PROGRAMS.
SCOPING STUDY FOR 1983 ECONOMICS
OF CLEAN WATER AND CLEAN AIR
REPORT TO CONGRESS.
COMPLETED FOUR MONTHS BEHIND
ORIGINAL SCHEDULE.
DISCHARGE MONITORING REPORT
EVALUATION
DELAYED FOUR MONTHS BY OMB
DEFINITIONAL CHANGES.
NATIONAL EMISSIONS DATA SYSTEM
EVALUATION
COMPLETED ACCORDING TO REVISED
SCHEDULE.

-------
                   OFFICE OF RESEARCH AND  DEVELOPMENT
                      MEETING PROGRAM COMMITMENTS
CLIENT PROGRAM
             ITEM
    STATUS
    OANR
ACID DISPOSITION
CRITERIA ASSESSMENT
DOCUMENT.
THE FINAL CRITERIA
DOCUMENT IS SEVEN
MONTHS BEHIND SCHEDULE,
THIS COMMITMENT HAS
BEEN CARRIED OVER INTO
THE FY 84 MAS.
    OANR
    OANR
    OANR
PLAN FOR TRANSFERRING
INHALABLE PARTICLE
MONITORING NETWORK
TO STATE AND LOCAL
AGENCIES.

STRATEGY FOR
EXTRAPOLATIONS MODELING
OF HEALTH EFFECT FROM
ANIMALS TO HUMANS.

REPORT ON APPLICATION OF
ADVANCED HEAVY OIL LOW
NOX BURNER TO OIL FIELD
STEAM GENERATORS.
THE PLAN WAS ISSUED ON
SCHEDULE AND OAQPS HAS
SIGNED THE CONCURRENCE
MEMO.
STRATEGY WAS ISSUED
ON SCHEDULE.
REPORT WAS SUBMITTED
TO PEER REVIEW PANEL
ONE MONTH AHEAD OF
SCHEDULE.
    OW
    OW
REVISED BIOLOGICAL
METHODS MANUAL.
MAPPING AREAS WITH
SENSITIVE SURFACE
WATERS.
THE MANUAL IS BEHIND
SCHEDULE.  THE COMPLETED
MANUAL IS EXPECTED TO BE
PUBLISHED ON 11/15/83.

A COMPREHENSIVE PACKAGE
OF MAPS WAS PRODUCED
THREE MONTHS AHEAD OF
SCHEDULE.

-------
K)

^
Of
Ul
        CD
                     LITIGATION ACTIONS PROCESSED BY HQ
              Fourth Quarter June 30, 1983 To September 30,1983
          80-j


          70-


          60-


          50-
          30-


          20-


           10


           0
1//////A
                                                                  Legend
                                                              ED CRIMINAL ACTIONS
                                                              IZZ CIVIL ACTIONS
                                       o
                                       -99-

-------
                              ENFORCEMENT

                       STATUS OF CIVIL  REFERRALS


o  EPA HEADQUARTERS IS PROCESSING CIVIL ACTIONS  IN A TIMELY MATTER.
   THE CIVIL ACTIONS PENDING AT END OF  QUARTER IS  LARGER THAN PREVIOUS
   QUARTERS DUE TO THE LARGE NUMBER OF  NEW  REFERRALS DURING THE FOURTH
   QUARTER.

o  THE NUMBER OF CIVIL ACTIONS PENDING  AT THE  DEPARTMENT Of JUSTICE WAS
   SIGNIFICANTLY REDUCED DURING THE FOURTH  QUARTER.

O  DURING THE FOURTH QUARTER, THE AVERAGE PROCESSING TIME BY EPA
   HEADQUARTERS FOR CIVIL REFERRALS TO  DOJ  WAS 88.5 DAYS MEETING
   ENFORCEMENT COUNSEL'S TARGET OF 90 DAYS.  HOWEVER,  THIS REFERRAL
   PROCESSING TIME IS SIGNIFICANTLY LONGER  THAN  THAT OF THE PREVIOUS
   THREE QUARTERS.

o  337 CIVIL ACTIONS WERE PENDING IN THE SYSTEM  AT THE END OF THE
   FISCAL YEAR.

   -  59 PERCENT HAVE BEEN FILED IN DISTRICT COURTS.
   -  22 PERCENT HAVE BEEN REFERRED TO  DOJ/U.S.  ATTORNEYS.
   -  19 PERCENT ARE PENDING REVIEW AT  EPA  HEADQUARTERS.

O  153 CIVIL CASES WERE CLOSED DURING FY 83.   APPROXIMATELY 40 PERCENT
   OF THESE CASES WERE CLOSED BY DISMISSAL  OR  WITHDRAWAL:

   -  91 BY SETTLEMENT.
   -  5 BY COURT JUDGMENT.
   -  6 BY COURT DISMISSAL.
   -  10 WITHDRAWN BY REGION.
   -  41 DECLINED BY EPA HEADQUARTERS,  DOJ  OR  U.S. ATTORNEY.
                                 -100-

-------
  0)


  "
40-1
      30-
      20-
      10-
       0
K)

^
m*
tj
to
2
o
                             CIVIL ENFORCEMENT CASES

                         Pending As Of September 30, 1983
                     EPA-HQ
                              No Pending: 65


                              Average Time

                              Pending: 88.5 days
                     I
                     to


                     Of
                     a
                                                  Deot of Justice / US Attv
                                              30-i
                                               70-i
                                               35-
                                                                         No Pending: 74
                                                              T/F
                                                          Courts
                                                     r    I
                                                                         No Panding: 198
                                                A    W   HW

-------
                              ENFORCEMENT
                   OEC POLICY AND  GUIDANCE  ACTIVITIES
          ITEM

PROPOSAL FOR CONSENT DECREE
TRACKING SYSTEM.
ENFORCING CONSENT DECREES
REQUIREMENTS.

ENFORCEMENT INDICATORS
CIVIL PENALTY SETTLEMENT
POLICY
SETTLEMENT PROCEDURES
MODEL CONSENT DECREE TERMS
COORDINATING FEDERAL AND
STATE ENFORCEMENT

INSPECTION BY CONTRACTORS

ENFORCEMENT/COMPLIANCE
GUIDANCE MANUALS (INCLUDING
COMPENDIUM OF OPERABLE POLICIES)
             STATUS

PROPOSAL WAS COMPLETED ON  SCHEDULE,
GUIDANCE ON TRACKING SYSTEM WILL  BE
ISSUED BY 10/83.

DRAFT POLICY STATEMENT WAS COMPLETED
ON SCHEDULE, FINAL DUE 1/84.

THE PROJECT IS BEHIND SCHEDULE,
COMPLETION BY 10/83.

DRAFT POLICY STATEMENT WAS COMPLETED
ON SCHEDULE, ISSUANCE OF POLICY
DOCUMENT DUE 11/83.

POLICY DOCUMENT WAS COMPLETED ON
SCHEDULE.

POLICY DOCUMENT WAS COMPLETED ON
SCHEDULE.

PROJECT REDEFINED BY TASK  GROUPS.
NEW WORK PLAN SCHEDULED FOR 12/83.

PROJECT TERMINATED.

SCHEDULES FOR MANUAL WERE  REVISED
DURING THE FOURTH QUARTER, ON
SCHEDULE WITH NEW TIMETABLES.

-------
K)
00
Ul
tn
o
                              SECTION 309 REVIEWS