100R83104  '^^r"-    K


                                                                 ^
              U.S. Environmental Protection Agency
                  Administrator's Management
                      Accountability System


                 Second Quarter FY 1983 Report
EPA
TOO/                               Office of Mmao«m«nf SVatoma
i""'                                   and JPvoluaCion
1982.2                                  Varc^ 31,1983

1983

2nd

-------
                 U. S. ENVIRONMENTAL PROTECTION AGENCY

                       Administrator's Management
                         Accountability System

                     Second Quarter t'Y 1983 Report

                                PREFACE

This is the second quarter FY 1983 report of EPA's Management
Accountability System.  It reports performance during the previous
quarter on specific program objectives and individual management
commitments in support of the Agency's major goals.  The report  is
published each quarter by the Office of Management Systems and Evaluation
(OMSE) using information provided by Headquarters and Regional Offices.
During the second quarter, we revised the procedures for reporting
Regional information in response to suggestions from both the Headquarters
and the Regional Offices.  Under the revised procedures Regional  program
performance is reported primarily by the National Program offices in
Headquarters, with subsequent confirmation by the Regional Administrator.

We gratefully acknowledge the continuing assistance and cooperation of
the many people in Headquarters program offices and in the Regions who
have made the timely production of this report possible.  We  invite
continuing examination of this report and the goals, objectives,  commit-
ments and measures contained in the Management Accountability System.
We would appreciate any suggestions you have for improving the System,
and invite~you to contact either Lew Crampton or Cindy Kelly with your
ideas.
                                  ENiAl- p«OiECTION AGENCY

-------
                            TABLE OF CONTENTS
OFFICE                                                                   PAGE

OFFICE OF AIR,  NOISE AND
  RADIATION  	  1

OFFICE OF PESTICIDES AND
  TOXIC SUBSTANCES 	 19

OFFICE OF WATER 	,	 39

OFFICE OF SOLID WASTE
  AND EMERGENCY RESPONSE 	 63

OFFICE OF ADMINISTRATION 	 79

OFFICE OF POLICY AND
  RESOURCE MANAGEMENT 	 85

OFFICE OF RESEARCH
  AND DEVELOPMENT 	 89

OFFICE OF LEGAL AND
  ENFORCEMENT COUNSEL 	 93
                                   -ill-

-------
                    OFFICE OF AIR, NOISE  AND RADIATION
                            TABLE OF  CONTENTS
         GOAL                                                PAGE
DEVELOPING AND  REVIEWING CRITICAL REGULATIONS
ENFORCEMENT
MEETING PROGRAM  COMMITMENTS,
DELEGATION TO  STATES 	  12
                                   -1-

-------
             DEVELOPING  AND REVIEWING CRITICAL REGULATIONS

    REDUCING THE BACKLOG OF NEW SOURCE PERFORMANCE STANDARDS  (NSPS)

o  SIGNIFICANT PROGRESS  WAS MADE DURING THE SECOND QUARTER  TO IMPROVE
   MANAGEMENT OF THE  NSPS DEVELOPMENT PROCESS:

   -  A COMPREHENSIVE REVIEW OF THE SCHEDULE AND RESOURCES  NEEDED TO
      COMPLETE NSPS FOR  THE PRIORITY SOURCE CATEGORIES WAS  COMPLETED.
   -  MANAGEMENT REFORMS AIMED AT EXPEDITING THE REVIEW  PROCESS  DURING
      NSPS DEVELOPMENT WERE IMPLEMENTED.

o  A NEW MULTI-YEAR SCHEDULE HAS BEEN DEVELOPED THAT WILL MEET STATUTORY
   REQUIREMENTS AS QUICKLY AS POSSIBLE:

   -  DURING FY 83, 16 PROMULGATIONS (9 ARE PRIORITY LIST NSPS)  AND 21
      PROPOSALS ARE SCHEDULED.
   -  AT MID-YEAR, 10 PROMULGATIONS (4 ARE PRIORITY LIST NSPS) AND 6
      PROPOSALS HAVE  BEEN MADE.

O  AGENCY RED BORDER  AND OMB REVIEWS CONTINUE TO CAUSE LENGTHY DELAYS:

   -  RED BORDER REVIEW  AVERAGES ONE-TO-TWO MONTHS LONGER THAN ALLOWED.
   -  OMB HAS HELD TWO NSPS PACKAGES OVER ONE YEAR WITHOUT  PROVIDING
      FORMAL NONCONCURRENCE MEMOS.


-------
DEVELOPING AND REVIEWING CRITICAL REGULATIONS




       PLANNED NSPS MULTI-YEAR  PROGRAM
PROMULGATIONS
I. PRIORITY LIST (36)
II. OTHER NSPS (36)
TOTAL
CUMULATIVE
% OF PRIORITY LIST
% OF TOTAL
THROUGH
FY 82
7
_J3
10
10


83
9
_7
16
26
44
36
I
84
12
_9
21
47
78
65
^ISCAI
85
7
_H
7
54
97
75
. YEA!
86
1
_4
5
59
100
82
*
87
0
5
5
64
-
89
88
0
_8
8
72
-
100
      FY 1983 NSPS DEVELOPMENT  SCHEDULE
MILESTONE
PROPOSALS
PROMULGATIONS
1
(2)
(5)
QUAI
2
(4)
(5)
*TER
3
12
5
4
3
1
    (x) = ACTUAL NUMBERS
                      -3-

-------
              DEVELOPING AND REVIEWING CRITICAL REGULATIONS




           OANR SCHEDULE FOR FY  83  PROPOSAL AND PROMULGATION
STANDARD
PROPOSAL
F . R . DATE
PROMULGATION
F . R . DATE
STATUS*
NATIONAL AMBIENT AIR QUALITY STANDARDS
CARBON MONOXIDE
PARTICULATE MATTER
NITROGEN DIOXIDE
SULFUR DIOXIDE
—
3/83
5/83
9/83
4/83
3/84
5/84
9/84
OFF SCHEDULE 4 MONTHS;
DATA PROBLEMS
OFF SCHEDULE 3 MONTHS;
OANR INTERNAL DELAY
OFF SCHEDULE 4 MONTHS;
OANR INTERNAL DELAY
OFF SCHEDULE 8 MONTHS;
CASAC CLOSURE DELAY
NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS
COKE OVEN (BENZENE)
ASBESTOS REVISION
BENZENE FUGITIVE
MALEIC ANHYDRIDE
(BENZENE)
ETHYBENZENE
STYRENE
BENZENE STORAGE
7/83
5/83
—
—
—
--
—
—
7/83
7/83
7/83
7/83
OFF SCHEDULE 1 MONTH;
OANR INTERNAL DELAY
OFF SCHEDULE 1 MONTH;
RED BORDER DELAY
OFF SCHEDULE 1 MONTH;
OANR INTERNAL DELAY
OFF SCHEDULE 1 MONTH;
OANR INTERNAL DELAY
OFF SCHEDULE 1 MONTH;
OANR INTERNAL DELAY
OFF SCHEDULE 1 MONTH;
OANR INTERNAL DELAY
*BASED ON  INTERIM MILESTONES
                                    -4-

-------
             DEVELOPING AND  REVIEWING CRITICAL REGULATIONS




     OANR SCHEDULE FOR FY  83 PROPOSAL AND PROMULGATION (CONTINUED)
STANDARD
PROPOSAL
F.R. DATE
PROMULGATION
F.R. DATE
STATUS*
RADIATION REGULATIONS
INACTIVE URANIUM
MILL TAILINGS SITES
RADIONUCLIDES
NESHAP
DISPOSAL OF HIGH
LEVEL RADIOACTIVE
WASTE
ACTIVE URANIUM
MILL TAILINGS SITES
—
3/83
12/82
1/83
11/82
10/83
12/83
9/83
COMPLETED

ON SCHEDULE

ON SCHEDULE;
PUBLIC COMMENTS
OFF SCHEDULE 3 MONTHS;
RED BORDER/OMB DELAY
MOBILE SOURCES REGULATIONS
HD-HC/CO
POSTPONEMENT
HD-HC/CO REVISION
LD DIESEL AVERAGING
LD DIESEL
POSTPONEMENT
LEAD PHASEDOWN
--
—
—
12/82
—
1/83
9/83
12/82
10/83
11/82
COMPLETED

ON SCHEDULE

OFF SCHEDULE 5 MONTHS;
OANR INTERNAL DELAY
ON SCHEDULE

COMPLETED

*BASED ON INTERIM MILESTONES
                                   -b-

-------
                             AIR ENFORCEMENT

O  DURING THE SECOND  QUARTER THE NUMBER OF SIGNIFICANT VIOLATORS
   INCREASED, DUE  IN  PART  TO PASSAGE OF THE DECEMBER 31, 1982  COMPLIANCE
   DEADLINES FOR MANY VOC  SOURCES:
   -  SIGNIFICANT  VIOLATORS  INCREASED FROM 303 AT THE BEGINNING OF  THE
      QUARTER TO 330  AT  THE  END OF  THE QUARTER.
   -  77 NEW SIGNIFICANT VIOLATORS  IDENTIFIED.
      50 SIGNIFICANT  VIOLATORS RETURNED TO COMPLIANCE.

O  THE OVERALL COMPLIANCE  RATE FOR  MAJOR SOURCES REMAINS AT  95% FOR
   THE SECOND QUARTER.

O  COMBINED EPA/STATE INSPECTION STATISTICS IMPROVED THIS QUARTER AS
   DATA ENTRY PROBLEMS IN  THE REGIONS ARE BEING CORRECTED:
   -  67% OF Al SOURCES  DUE  INSPECTION WERE INSPECTED.
   -  74% OF A2 SOURCES  DUE  INSPECTION WERE INSPECTED.

O  SERIOUS PROBLEMS WITH INSPECTION FREQUENCY HAVE BEEN IDENTIFIED  IN
   FOUR REGIONS (V, VII, X,  AND POSSIBLY I).  HEADQUARTERS IS  WORKING
   WITH THE REGIONAL  OFFICES TO DEVELOP SOLUTIONS TO THESE PROBLEMS.
                                   -6-

-------
UJ

3
O
               PROGRESS IN RETURNING AIR VIOLATORS TO COMPLIANCE

                                 As Of March 31,1983
                SIGNIFICANT VIOLATORS
                  OUT OF COMPLIANCE
               LONGER THAN 2 QUARTERS
        100-
         75-
      U  50
      a:
      UJ
      a.
         25
                  1       2      3
                      QUARTER
                                      MAJOR SOURCE COMPLIANCE RATE
                                                COMPLIANCE
                                                95.0%
                                                                                 5.0X
                                                              INSPECTION RATE: 70X
                                                              OF SOURCES DUE INSPECTION
00
     PENDING
     ACTION:
303    330
                                           -7-

-------
                      MEETING  PROGRAM COMMITMENTS

AIR TOXICS STRATEGY

o  A DRAFT DOCUMENT,  "PROPOSED PROCESS FOR CONTROL AND EVALUATION OF
   TOXIC AIR POLLUTANTS,"  HAS  BEEN  DISTRIBUTED AS SCHEDULED FOR EXTERNAL
   REVIEW.

o  THE FINAL REPORT WILL BE  SUBMITTED TO THE ADMINISTRATOR IN THE
   FOURTH QUARTER.

ENVIRONMENTAL RESULTS INDICATORS

O  A CONTRACT WAS AWARDED  AS SCHEDULED TO STUDY THE FEASIBILITY OF
   REPORTING ADDITIONAL INDICATORS.   A REPORT WILL BE SUBMITTED BY THE
   END OF THE FISCAL  YEAR  WITH ADDITIONAL INDICATORS TO BE TRACKED.

o  A REPORT OF THE NUMBER  OF NONATTAINMENT AREAS WILL BE INCLUDED AT
   THE END OF THE FOURTH QUARTER.

-------
                      MEETING  PROGRAM COMMITMENTS

                           SPECIAL ACTION SIPS


PROGRESS ON LEAD SIPs

o  SCHEDULES FOR COMPLETING  LEAD SIPS WERE NOT NEGOTIATED AS PLANNED.
   ALTHOUGH ORAL AGREEMENT HAS BEEN REACHED BY EPA AND NRDC, THERE IS
   NO WRITTEN AGREEMENT  IN THE NRDC'S LAWSUIT.  THEREFORE, FINAL GUIDANCE
   ON COMPLETING THESE SIPS  CANNOT BE PROVIDED TO THE REGIONAL OFFICES.

O  ADDITIONAL TECHNICAL  GUIDANCE FOR PREPARING THE LEAD SIPS WAS PROVIDED
   TO THE REGIONS DURING THE SECOND QUARTER.

O  DURING THE THIRD QUARTER, A CONTRACT TO UPDATE TECHNICAL, POLICY AND
   LEGAL GUIDANCE ON LEAD  SIPS WILL PROVIDE ASSISTANCE TO THE REGIONAL
   OFFICES IN THEIR REVIEW AND PROMULGATION OF LEAD SIPS.


PROGRESS ON 1982 OZONE/CO  SIPs

o  ALL REQUIRED SIP PROPOSALS  WERE PUBLISHED ON FEBRUARY 3, 1983.

O  SCHEDULES FOR FINAL ACTION  HAVE NOT BEEN PREPARED.  ROUTINE SIP
   PROCESSING REQUIREMENTS WILL HAVE FINAL ACTIONS REACH HEADQUARTERS
   BY JULY 3, 1983; PUBLICATION IN THE FEDERAL REGISTER BY
   SEPTEMBER 3, 1983.

   -  FINAL ACTIONS FOR  PROPOSED SIP DISAPPROVALS WILL CONTAIN
      SANCTION PROVISIONS.   THE PUBLIC COMMENT PERIOD HAS BEEN
      EXTENDED AND ANALYSIS  OF COMMENTS MUST BE COMPLETED BEFORE
      FINAL ACTION SCHEDULES ARE DETERMINED.

   -  FINAL ACTIONS FOR  PROPOSED SIP APPROVALS ARE EXPECTED TO
      OCCUR AT A FASTER  RATE THAN PROVIDED FOR BY ROUTINE SCHEDULING.
                                   -9-

-------
                      MEETING  PROGRAM  COMMITMENTS

               PERCENT OF SIP  REVISIONS  PROCESSED ON TIME

O  SIPS ARE CONTINUING TO BE PROCESSED IN A TIMELY MANNER:
   -  91% WITHIN THE FIVE MONTHS  REGIONAL TARGET.
   -  84% WITHIN THE TWO MONTHS HEADQUARTERS TARGET.

O  DURING THE SECOND QUARTER,  176 SIP  REVISIONS WERE PROCESSED; 111
   REVISIONS WERE PUBLISHED.

o  MAJOR POLICY ISSUES CONTINUE TO DELAY SOME SIP REVISIONS:
   -  SEVEN NEW SOURCE REVIEW  (NSR)  REVISIONS ARE ON HOLD IN THE REGIONS
      BECAUSE OF THE NRDC SUIT.
      ELEVEN REVISIONS ARE  DELAYED AT  HEADQUARTERS FOR ISSUES DEALING
      WITH NEW SOURCE REVIEW REQUIREMENTS, INTERSTATE TRANSPORT OF
      SO2, BUBBLES, AND REDESIGNATIONS OF NONATTAINMENT AREAS TO
      "UNCLASSIFIABLE".
                                   -10-

-------
                          PERCENT OF SIP REVISIONS


                             PROCESSED ON TIME


                             As Of March 31,1983
      100-rO
   UJ
   o
   a:
   UJ
   o_
                           TARGET
ISIPs IN PROCESS:  315
UJ
V)
2
O
1234

      QUARTERS
      354
        Legend

HEADQUARTERS ( TARGET - 2 MOS.)
REGIONS ( TARGET - 5 MOS. )
                                                        NATIONAL
                                                        LATE
                                                        10.0X

-------
                           DELEGATION TO STATES

                     NEW  SOURCE PERFORMANCE STANDARDS

O  DURING THE SECOND QUARTER  REGIONS SUBMITTED REVISED DELEGATION
   MILESTONES, MAKING THEM COMPATIBLE WITH APPLICABILITY DETERMINATIONS
   MADE DURING THE  FIRST QUARTER.

O  ALL REGIONAL COMMITMENTS WERE MET DURING THE SECOND QUARTER:
   -  REGION I ACHIEVED  100%  DELEGATION DURING THE SECOND QUARTER AND
      EXCEEDED ITS  YEAR-END PROJECTION BY DELEGATING ALL APPLICABLE  NEW
      NSPS.
   -  REGION VII  DELEGATED THREE NSPS TO IOWA.

O  THE OVERALL DELEGATION OF  NSPS NOW STANDS AT 91%.  WITH THE ADDITION
   OF FOUR NEW NSPS CATEGORIES DURING THE FIRST QUARTER, AN  INCREASE
   IN OVERALL DELEGATION TO 95% IS PROJECTED TO BE ACHIEVED  BY THE END
   OF THE FOURTH  QUARTER.

O  BECAUSE THE JOB  OF DELEGATING THE FEW REMAINING NSPS CATEGORIES HAS
   PROVED MORE DIFFICULT THAN WAS THE CASE FOR THE INITIAL GROUP, THE
   OVERALL TARGET OF 100% DELEGATION OF NSPS THIS FISCAL YEAR WILL
   PROBABLY NOT BE  MET.

-------
                           DELEGATION STATUS OF NSPS

                               As Of March 31, 1983
          100
to
CO
v\
2
o
       a
       bJ
       fee
       O
       y
       LJ
       a
       a
       &
       a.
                                                          TARGET
25-
                   l    II
                      IV   V    VI   VII  VIII   IX    X

                          REGIONS
         DELEGATED: 109   70   107   124   167   68   54   153   265   73

-------
                          DELEGATION  TO  STATES

        NATIONAL EMISSION STANDARDS FOR  HAZARDOUS AIR POLLUTANTS

o  NO NESHAPS DELEGATIONS WERE  SCHEDULED FOR THE SECOND QUARTER AND
   NONE WERE ACHIEVED.

o  AT THE END OF THE SECOND QUARTER,  THE DELEGATION OF NESHAPS REMAINS
   AT 94% OVERALL.

O  NO NEW NESHAPS HAVE BEEN PROMULGATED  SINCE THE BEGINNING OF THE
   FISCAL YEAR.  BASED UPON REGIONAL  COMMITMENTS REVISED DURING THE
   SECOND QUARTER, 97% DELEGATION  WILL BE ACHIEVED BY THE END OF THE
   FOURTH QUARTER.
                                   -14-

-------
                          DELEGATION STATUS OF NESHAPS

                                As Of March 31, 1983
           100 -rO
        o
        o
        LJ
        O

        h-

        Ld
        O
        CC
        LJ
        CL
                                                          TARGET
25 H
        I     II
                                  IV   V    VI   VII   VIII   IX   X
                                      REGIONS
CO
UJ
         (((DELEGATED: 64   32   67   59   117   41   32   73   212   37
                                          -Ib-

-------
                           DELEGATION TO STATES
                PREVENTION  OF SIGNIFICANT DETERIORATION
o  THERE HAS BEEN  NO  CHANGE  OF STATUS IN DELEGATION OF PSD  RESPONSIBILITY

o  NEITHER OF THE  TWO DELEGATIONS SCHEDULED IN REGION IX WERE ACHIEVED:
   -  ARIZONA'S SIP REVISION HAS NOW BEEN CLEARED BY OMB AND SENT  TO
      THE ADMINISTRATOR  FOR  SIGNATURE.
   -  NEVADA'S SIP REVISION  IS HELD UP AT THE REGIONAL OFFICE WHILE
      ENFORCEMENT  PROVISIONS ARE NEGOTIATED WITH THE STATE  (DELEGATION
      NOW EXPECTED IN FOURTH QUARTER).

O  BY THE END OF THE  FISCAL  YEAR, HALF OF THE STATES WITH NO PSD
   RESPONSIBILITY  ARE EXPECTED TO ACCEPT DELEGATION.

-------
K)
Ul
V)

o
                    DELEGATION STATUS OF PSD
                        As Of March,  311983
                       III    IV
                          V    VI
                          REGIONS
VII   VIII   IX
 Selected local agencies with Independent authority :

 PA - Allegheny Co. Philadelphia
 AZ - MarTcopa Co. Plma Co
 CA - Bay Area Diet, Kern Co. San Diego Co, So Coaet Dl»t, Ventura Co
 NV - Clark Co. Washoe Co

 Excluilont: Region II - PR.Vh  Region VIII - SD;
	Region IX - OU. AS, TT	
                             4-



                             3-



                             2-



                             1-



                             0
                                                                                      MR
                                                                                      PM
                                                                                           VC
                                                                                           SO
                                                                                           SC
                                                                                   KC
                                                                                PA   AZ   CA   NV
                                                                                      STATES
                                                                                Legend
                                                                                NONE	IB
                                                                                PRRTIflL-- 18
                                                                                FULL	28
                                   TARGETED TOR FULL
                                   DELEGATION IN FY-83


                                   TARGETED FOR PARTIAL
                                   PROGRAM DELEGATION
                                   IN FY-83
                                                   -17-

-------
                           DELEGATION TO STATES

NATIONAL AUDIT SYSTEM

o  KEY DEVELOPMENTAL STEPS TOWARD ACHIEVEMENT OF THE NATIONAL AIR
   PROGRAM AUDIT SYSTEM WERE  COMPLETED ON SCHEDULE;
   -  A SURVEY OF REGIONAL AIR AUDIT PROGRAMS WAS COMPLETED.
   -  A WORK GROUP COMPOSED OF BOTH EPA AND STAPPA/ALAPCO REPRESENTATIVES
      WAS FORMED TO DETERMINE AUDIT ELEMENTS, SCHEDULES AND CRITERIA.

o  DRAFT AUDIT CRITERIA WILL  BE AVAILABLE BY JUNE AND REGIONS WILL
   PROVIDE AUDIT SCHEDULES FOR FY 84 BY THE END OF THE FOURTH QUARTER,
   FOLLOWING ISSUANCE OF  THE  FINAL AUDIT CRITERIA.

TAMPERING AND FUEL SWITCHING  PROGRAM

O  COMMITMENTS FOR THE NUMBER OF TAMPERING AND FUEL SWITCHING PROGRAMS
   DEVELOPED BY STATES DURING FY 83 WERE SUBMITTED ON SCHEDULE BY ALL
   REGIONAL OFFICES.

O  BY THE END OF THE FISCAL YEAR, 32 AREAS ARE EXPECTED TO HAVE OPERATING
   PROGRAMS OR TO BE MAKING SIGNIFICANT PROGRESS TOWARD IMPLEMENTATION
   OF PROGRAMS.
                                   -18-

-------
                OFFICE OF PESTICIDES AND  TUX 1C SUBSTANCES











                            TABLE Ob' CONTENTS











         GOAL                                                PAGE







MEETING PROGRAM COMMITMENTS	  20







DEVELOPING AND  REVIEWING CRITICAL REGULATIONS	  31







ENFORCEMENT	  32







IMPROVING THE QUALITY OF EPA SCIENCE	  38
                                   -19-

-------
                      MEETING  PROGRAM COMMITMENTS

                  PESTICIDE  REGISTRATION APPLICATIONS

CURRENT APPLICATIONS

o  OPP COMPLETED AN AVERAGE  OF 98%  OF ALL APPLICATIONS WITHIN THE
   ADMINISTRATIVE TIMETABLES.

o  OPP EXCEEDED THE TARGET  IN  EACH  CATEGORY OF REGISTRATION APPLICATIONS:
   -  97% OF NEW CHEMICAL REVIEWS;
   -  98% OF OLD CHEMICAL REVIEWS;  AND
   -  99% OF AMENDED  REGISTRATION  REVIEWS.

O  OF 4,634 APPLICATIONS PROCESSED, 20%  OF THE APPLICATIONS WERE FOR
   NEW CHEMICALS.

BACKLOG

o  THE NUMBER OF BACKLOGGED  APPLICATIONS CONTINUED TO GROW TO 69 FROM
   31 LAST QUARTER.   THIS COMPARES  WITH  183 AT THIS TIME LAST YEAR.
   OPTS ATTRIBUTES THE  RECENT  INCREASE TO SEVERAL FACTORS, INCLUDING
   AN INCREASE IN REGISTRATION APPLICATIONS AND THE TRANSFER OF 20 KEY
   SCIENTIFIC AND TECHNICAL  STAFF  FROM OPP TO OTS IN AN OUTPLACEMENT
   PROGRAM.
                                   -20-

-------
                      PESTICIDE REGISTRATION APPLICATIONS

                  PERCENT OF FY-83 APPLICATIONS COMPLETED
                          WITHIN APPLICABLE TIMETABLE

                              As Of March 31,1983
K)

5-
ui
V*
2
O
       O
       a:
       UJ
       a.
TOTAL
PROCESSED :
4357
                      2      3

                     QUARTERS
4634
                                               •TARGET
                                                     SIZE OF BACKLOG
                                                  100-1

                                                   75-

                                                   50-

                                                   25-
                                                         82   1   234
                                                              QUARTERS
                                                              NO. OF PENDING
                                                           APPLICATIONS WHOSE TIME
                                                           LIMIT HAS BEEN EXCEEDED
                                                       Legend
                                                        ACTUAL
                                       -21-

-------
                      MEETING  PROGRAM  COMMITMENTS

                  PESTICIDE  FFDCA  TOLERANCE PETITIONS

CURRENT PETITIONS

O  OPTS REVIEWED 81% OF THE  SUBMISSIONS WITHIN THE STATUTORY DEADLINE,
   PERFORMANCE IN THIS AREA  HAS  NOTABLY IMPROVED BOTH FROM 75% LAST
   QUARTER AND 54% AT THIS TIME  LAST YEAR.

O  QUARTERLY PERFORMANCE  IMPROVED  WHILE THE NUMBER OF SUBMISSIONS
   PROCESSED INCREASED BY 76%  OVER FIRST QUARTER.

BACKLOG

o  OPTS HAS BEGUN TO RECOVER FROM  IT'S FIRST QUARTER INCREASE IN THE
   BACKLOG.
                                   -22-

-------
                           FFDCA TOLERANCE PETITIONS


                     PERCENT OF FY-83 PETITIONS COMPLETED

                           WITHIN STATUTORY TIME LIMIT


                               As Of March 31,1983
       100 -i
o
o:
LJ
Q.
K)

00
Ul

(SI
50-
     TOTAL
     PROCESSED :
                                             TARGET
                        2     3

                       QUARTERS
             113
                       199
                                                           SIZE OF BACKLOG
                                                         60-i
                                                         45-
                                                        30-
                                                         15-
                                                          82   1   2   3

                                                               QUARTERS
                                                               NO. OF PENDING
                                                             PETITIONS WHOSE TIME
                                                            LIMIT HAS BEEN EXCEEDED
                                                         Legend

                                                          ACTUAL
                                        -23-

-------
                      MEETING  PROGRAM  COMMITMENTS

                   PESTICIDE EXPERIMENTAL USE PERMITS

CURRENT APPLICATIONS

o  OPTS MET THE STATUTORY  DEADLINE  FOR REVIEW OF SUBMISSIONS IN 87% OF
   THE CASES.  EVEN THOUGH THIS  IS  A SLIGHT DECREASE IN PERFORMANCE
   AGAINST TARGET, THE TOTAL NUMBER OF SUBMISSIONS PROCESSED NEARLY
   DOUBLED DURING THE SECOND QUARTER.

BACKLOG

o  THE BACKLOG INCREASED SLIGHTLY TO 12 ACTIONS IN THE SECOND QUARTER.
   OPTS ATTRIBUTES THIS INCREASE TO THE LOSS OF KEY SCIENTIFIC AND
   TECHNICAL STAFF IN OPP.
                                   -24-

-------
                     EXPERIMENTAL USE PERMIT APPLICATIONS

                          PERCENT PROCESSED ON TIME

                              As Of March 31,1983
          1001
K)
00
2
O
     TOTAL
     PROCESSED :
6B
                           2     3
                          QUARTERS
120
                                                TAftOET
                                        SIZE OF BACKLOG
                                                        20-1
                                                        10-
                                                          82  1   234
                                                               QUARTERS
                                                           NO. OF APPLICATIONS
                                                            WHOSE TIME LIMIT
                                                            HAS BEEN EXCEEDED
Legend
 ACTUAL

 IMWKT,.,,
                                       -25-

-------
                       MEETING PROGRAM COMMITMENTS

                     PESTICIDE REGISTRATION STANDARDS

O  OPTS ESTABLISHED  FIVE  REGISTRATION STANDARDS IN THE SECOND QUARTER.
   THIS PERFORMANCE  MET THE  SECOND QUARTER TARGET AND RAISED TO  EIGHT
   THE CUMULATIVE  NUMBER  OF  STANDARDS COMPLETED IN FY 83.

o  DURING THE SECOND QUARTER, OPRM CONDUCTED A MANAGEMENT  REVIEW OF
   THE FOLLOW-UP NEEDED FOR  OPP TO OBTAIN AND PROCESS DATA REQUESTED
   UNDER THESE STANDARDS.  RECOMMENDATIONS HAVE BEEN SUBMITTED TO OPP
   MANAGEMENT FOR  DEVELOPMENT OF A COMPREHENSIVE WORK PLAN TO BE
   INCORPORATED INTO THE  ACCOUNTABILITY SYSTEM WHICH WILL  RESULT IN
   AN INCREASED FOCUS ON  FOLLOW-UP ACTIVITIES BY THE END OF FY 83.
                                   -26-

-------
 K)
 00
 UJ
 V}
 2
 o
                      PESTICIDE REGISTRATION STANDARDS

                CUMULATIVE NUMBER OF STANDARDS ESTABLISHED

                            As Of March 31,1983
                  25-i
  2      3
  QUARTERS
 Legend
•I ACTUAL
IZZ) TARGET
L-
                                     -27-

-------
                      MEETING  PROGRAM COMMITMENTS

                   PESTICIDE SPECIAL REVIEW DECISIONS

o  NO SPECIAL REVIEW  DECISIONS WERE COMPLETED IN THE SECOND QUARTER,
   NOR HAVE ANY BEEN  COMPLETED IN  FY 83  AGAINST AN END-OF-YEAR TARGET
   OF 13.

o  OPTS ATTRIBUTES THIS  LACK OF PERFORMANCE TO A NUMBER OF FACTORS:
   -  LOSS OF KEY SCIENTIFIC STAFF AND PROJECT MANAGERS;
   -  USE OF SCARCE STAFF  TO ADDRESS OTHER HIGH PRIORITY PROBLEMS; AND
   -  UNANTICIPATED ISSUES WHICH HAVE HAMPERED DECISION-MAKING AND
      DISRUPTED PROGRAM  PROCESSES.

O  OPTS HAS SUBMITTED A  DRAFT  REQUEST TO ADJUST DOWNWARD FROM 13 TO 9
   THE TOTAL SPECIAL  REVIEW TARGET FOR FY 83.
                                   -2H-

-------
                    PESTICIDE SPECIAL REVIEW DECISIONS

               CUMULATIVE NUMBER OF DECISIONS COMPLETED

                          As Of March 31,1983
                20-1
00
UJ
V)

o
             g
             00
                 10-
  2     3
  QUARTERS
 Legend
•I ACTUAL
E3 TARGET
                                   -29-

-------
                      MEETING  PROGRAM COMMITMENTS
             SUMMARY OF  OPTS  ACTIONS ON EXISTING CHEMICALS
        ITEM
     STATUS
o  PCB REMAND—PROPOSED  RULE FOR
   UNCONTROLLED SYSTEMS.
ON SCHEDULE:  SUBMITTED
COURT-ORDERED QUARTERLY
PROGRESS REPORT.
o  FORMALDEHYDE  INTERAGENCY  AGREEMENT,
ON SCHEDULE;  COMPLETED
QUARTERLY REVIEW OF
CLEARINGHOUSE AND WORKSHOP
ACTIVITIES.
O  FORMALDEHYDE CANCER-CASE CONTROL
   STUDY.
BEHIND SCHEDULE ONE  MONTH:
DEVELOPED AND SUBMITTED
STUDY QUESTIONNAIRE  TO  OMB
FOR APPROVAL.
O  MBOCA—PROPOSED RULE.
BEHIND SCHEDULE  THREE  WEEKS:
ANPR AND DEVELOPMENT PLAN
COMPLETED STEERING  COMMITTEE
REVIEW THREE WEEKS  LATE.
                                   -30-

-------
             DEVELOPING AND  REVIEWING CRITICAL REGULATIONS
               SUMMARY OF SECOND QUARTER OPTS ACTIVITIES
            ITEM
        STATUS
o  REVIEW OF FIFRA REGULATIONS:
   -  WORKER PROTECTION STANDARD.
RECOMMENDATION FORWARDED
TO AA/OPTS ON SCHEDULE.
O  TSCA PREMANUFACTURE NOTIFICATION
   (PMN) RULE.
AHEAD OF SCHEDULE;  STEERING
COMMITTEE AND RED BORDER
REVIEWS COMPLETED TWO WEEKS
EARLY.

-------
                               ENFORCEMENT

                FIFRA  COMPLIANCE MONITORING INSPECTIONS

o  INSPECTIONS COMPLETED IN  THE SECOND QUARTER RAISED THE TOTAL NUMBER
   OF INSPECTIONS  IN FY  83 TO WITHIN 75% OF THE END-QF-YEAR TARGET.

O  AFTER A RELATIVELY  POOR SHOWING LAST QUARTER, OPP MADE A NOTEWORTHY
   EFFORT TO IMPROVE ITS PERFORMANCE IN COMPLETING LABORATORY AUDITS.
   13 AUDITS WERE  COMPLETED  IN THE SECOND QUARTER AGAINST THE END-OF-YEAR
   TARGET OF 40.

O  SIGNIFICANT VIOLATORS INCLUDE THOSE ISSUED.ADMINISTRATIVE CIVIL
   COMPLAINTS AND  CRIMINAL REFERRALS TO DOJ.
                                   -32-

-------
to
ft
o
                 F1FRA COMPLIANCE MONITORING INSPECTIONS
                        AND ENFORCEMENT ACTONS

                      CUMULATIVE NUMBER COMPLETED

                           As Of March 31,1983
                500-
SIGNIF1CANT
VIOLATORS
ADDRESSED:
                                                      EOTTAMCT
1       2        3

     QUARTERS

41       77
                                   -3J-

-------
                               ENFORCEMENT

                 TSCA COMPLIANCE MONITORING INSPECTIONS

O  COLLECTIVELY, THE REGIONS  ARE ON TARGET SCHEDULE, COMPLETING 45%
   OF THEIR END-OF-YEAR  COMMITMENT.

O  OF 483 INSPECTIONS COMPLETED, 436 WERE FOR PCB COMPLIANCE MONITORING.
   ONLY 1 DIOXIN INSPECTION HAS  BEEN COMPLETED AGAINST THE END-OF-YEAR
   TARGET OF 64.

O  CONSENT AGREEMENTS AND  FINAL  ORDERS HAVE BEEN SIGNED TO RETURN  26
 •  OF 138 SIGNIFICANT VIOLATORS  TO COMPLIANCE THIS YEAR.  THE CUMULATIVE
   NUMBER OF FY 83 CASES REMAINING OPEN IS 112.  SETTLEMENT DISCUSSIONS
   ARE ONGOING IN THESE  CASES.
                                   -34-

-------
TSCA COMPLIANCE MONITORING INSPECTIONS
AND ENFORCEMENT ACTIONS
CUMULATIVE NUMBER COMPLETED
As Of March 31, 1983
















•0
$
1*1
ft
o
a
GJ I80°"
S. 1600-
2E
0 1400-
g 1200-
2 1000-
Z 800-
Ld
fr 600-
3 400-
Z)







>»
S
/
S
^^
i ™\./'
o «JX^

1234
QUARTERS
SIGNIFICANT
VIOLATORS
ADDRESSED: 50 138


-------
                               ENFORCEMENT

            REGIONAL TSCA COMPLIANCE MONITORING INSPECTIONS

o  THE REGIONS MADE MIXED PROGRESS  IN THE SECOND QUARTER TOWARD ACHIEVING
   THEIR END-OF-YEAR TARGETS:
   -  REGIONS II AND VII AND SHOULD SIGNIFICANTLY INCREASE THEIR
      ENFORCEMENT ACTIVITY  IN  THE THIRD QUARTER;
   -  REGION V MADE SLOW PROGRESS,  BUT EFFECTIVELY FOCUSED ITS ENFORCEMENT
      EFFORTS TO ADDRESS 71 SIGNIFICANT VIOLATORS WHILE COMPLETING 124
      INSPECTIONS IN THE FIRST TWO  QUARTERS;
   -  REGION VIII HAS COMPLETED 287 INSPECTIONS IN FY 83 AGAINST A
      TARGET OF 98.  THE APPARENT LOW VIOLATION RATE IN REGION VIII
      WHEN COMPARED TO  REGION  V WILL BE REVIEWED BY OPRM IN THE THIRD
      QUARTER.

O  NEXT QUARTER, THE REGIONS WILL BEGIN TO REPORT ON THE NUMBER OF
   SIGNIFICANT VIOLATORS IDENTIFIED IN TSCA INSPECTIONS.  THIS INFORMATION
   WILL MAKE IT POSSIBLE TO CALCULATE THE COMPLIANCE RATE.
                                   -Jb-

-------
              REGIONAL TSCA COMPLIANCE MONITORING INSPECTIONS

                              As Of March 31,1983
5
2
O
       a
          500-1
        SIGNIFICANT
        VIOLATORS
        ADDRESSED:  4
                       II
                                IV   V   VI  VII  VIII  IX   X

                                     REGIONS
                                      71   13
                                                         Legend
                                                    • ACTUAL
                                                    E2 END-OF-YEAR TARGET
                                       -37-

-------
                  IMPROVING THE QUALITY  OF  EPA SCIENCE
                      QUALITY ASSURANCE  ACTIVITIES
OPP
o  OPP COMPLETED ON SCHEDULE A  STANDARD OPERATING PROCEDURE FOR
   FORMULATION ANALYSIS AND CHEMICAL  LABORATORIES; HOWEVER, THE PLAN
   HAS NOT YET BEEN APPROVED BY THE OPP QA OFFICER.
OTS
O  OTS COMPLETED AND APPROVED  AHEAD OF  SCHEDULE A QA PROJECT PLAN FOR
   ASBESTOS EFFICACY TESTING OF  ABATEMENT TECHNIQUES.
                                   -J8-

-------
                            OFFICE  OF  WATER
                           TABLE  OF  CONTENTS
        GOAL                                             PAGE
DELEGATION TO STATES  	   40
DEVELOPING AND REVIEWING CRITICAL  REGULATIONS 	   47
MEETING PROGRAM COMMITMENTS  	   50
ENFORCEMENT 	   58
                                 -3y-

-------
                                DELEGATION

                CONSTRUCTION GRANTS  DELEGATION TO STATES
                  AND ASSIGNMENT  TO  CORPS  OF ENGINEERS

o  AT THE START OF FY 83, THE  PROGRAM WAS  77% DELEGATED WITH FOURTEEN STATES
   FULLY DELEGATED.  BY THE END OF FY 83,  THE PROGRAM IS SCHEDULED TO
   BE 85% DELEGATED, WITH TWENTY-THREE STATES FULLY DELEGATED.

o  THE PROGRAM MET ITS NATIONAL MID-YEAR TARGET AND IS NOW 82% DELEGATED:
      56% TO THE STATES.
      26% TO THE CORPS.

O  REGIONS II, VII AND VIII MET AND  REGION VI SIGNIFICANTLY EXCEEDED
   MID-YEAR TARGETS FOR TOTAL  WORKLOAD DELEGATED.

O  THREE STATES HAVE BEEN FULLY DELEGATED  SINCE THE START OF FY 83:
   -  IN REGION II, NEW YORK AND  NEW JERSEY.
      IM REGION IV, NORTH CAROLINA.

O  AT THE START OF FY 83, FORTY-SIX  STATES AND TERRITORIES HAD SIGNED
   DELEGATION AGREEMENTS.  THREE  MORE STATES ARE EXPECTED TO SIGN
   DELEGATION AGREEMENTS BY THE END  OF FY  83.
                                 -40-

-------
    CONSTRUCTION GRANTS DELEGATION STATUS
PERCENT WORKLOAD DELEGATED TO STATES & CORPS
              As Of March 31,1983
                                          PERCENT - NATIONWIDE
                                        lOO-i
                                             NONE
                                         75  '
                                          82  1   2   3  4
                                              QUARTERS
                                               Legend
                                            CORPS OF ENGINEERS
                                            STATE
                                         a NONE
                       -41-

-------
                                DELEGATION
                   STATE  ASSUMPTION OF NPDES AUTHORITY
o  AT THE START OF  FY  83,  TEN  STATES HAD ASSUMED FULL DELEGATION.   BY
   THE END OF FY  83, SEVENTEEN STATES ARE SCHEDULED TO BE  FULLY  DELEGATED.

O  DURING THE FIRST TWO  QUARTERS,  REGIONS IV AND V MET THEIR TARGETS:
   -  MISSISSIPPI ASSUMED  FULL DELEGATION AFTER ACCEPTING  FEDERAL
      FACILITIES  ACTIVITY.
      OHIO ADDED  FEDERAL FACILITIES TO ITS BASE NPDES ACTIVITIES.

O  REGION VII WAS UNABLE TO DELEGATE PRETREATMENT ACTIVITIES TO  NEBRASKA
   AS SCHEDULED DUE TO PROBLEMS WITH STATE REGULATIONS.

o  REGIONS I, II, III, VI  AND  VIII ARE NOT SCHEDULED TO  DELEGATE NPDES
   PROGRAM ACTIVITIES  IN FY 83.

-------
               STATE ASSUMPTION OF NPDES AUTHORITY
                          As Of March 31,1983
                    II    III    IV
                V    VI
                REGIONS
VII   VIII   IX
                                                                           Legend
                                                                 a NO flSSUHED flCTIVITIES      18
                                                                 CD NPQES ONLY                8
                                                                    NPOES 4 ONE OTHER RCTIVin  16
                                                                    FULL flSSUMPTION           11
                                                                     •• TARGETED FOR FUU
                                                                       ASSUMPTION IN FY-83
K>
Atsumabl* activities art NPOES, F«d«ral Faetlltlci
and Prttrtatmtnt.
                                                                       TARGETED FOR ONE MORE
                                                                       ACTIVITY IN FY-83
                                               -43-

-------
                                DELEGATION

         STATE UNDERGROUND INJECTION CONTROL PROGRAMS APPROVED


o  AT THE START OF THE  SECOND QUARTER OF FY 83:
   -  5 STATES HAD ASSUMED FULL PRIMACY.
   -  5 STATES HAD PARTIAL PROGRAM APPROVAL.
   -  30 STATES HAD ASSUMED NO ACTIVITIES.
   -  18 STATES REQUIRED  FEDERAL PROGRAMS.

O  DURING THE SECOND QUARTER,  UTAH ASSUMED FULL PRIMACY AND FLORIDA  AND
   NEBRASKA RECEIVED PARTIAL PROGRAM APPROVAL.  SIX STATES NOW HAVE
   FULL PRIMACY AND SIX STATES HAVE PARTIAL PROGRAM APPROVAL.

o  BY THE END OF  FY 83:
   -  27 STATES ARE SCHEDULED FOR FULL PRIMACY.
      3 STATES ARE SCHEDULED FOR PARTIAL PROGRAM APPROVAL.
      10 STATES ARE NOT EXPECTED TO ASSUME ANY ACTIVITIES.
   -  18 STATES ARE EXPECTED TO REQUIRE FEDERAL PROGRAMS.

O  REGIONS III AND VIII MISSED THEIR TARGETS FOR MARYLAND AND SOUTH  DAKOTA.

O  AT THE END OF  THE SECOND QUARTER, STATE UIC PROGRAMS COVERED ABOUT  50%
   OF THE APRIL 13, 1983  NATIONAL INVENTORY OF INJECTION WELLS AND,  BY
   THE END OF THE YEAR, THEY ARE EXPECTED TO COVER ABOUT 85%.

O  THE OFFICE OF  WATER  HAS PROPOSED CHANGES TO THE DELEGATION SCHEDULE.

                          DIRECT IMPLEMENTATION

O  THE OFFICE OF  WATER  HAS ACCELERATED ITS DIRECT IMPLEMENTATION SCHEDULE.
   A DIRECT IMPLEMENTATION PROGRAM FOR ALL STATES IS TARGETED TO BE
   PROPOSED 5/83  AND FINAL 10/83.

O  PROGRAMS CURRENTLY TARGETED FOR DIRECT IMPLEMENTATION WILL COVER
   ABOUT 15% OF THE APRIL 13,  1983 NATIONAL INVENTORY OF INJECTION WELLS.

O  THE OFFICE OF  WATER  HAS PROPOSED ADDING SOME STATES TO THE LIST FOR
   DIRECT IMPLEMENTATION.

                                   -44-

-------
                     STATE UIC PROGRAMS APPROVED
                           As Of March 31,1983
                                                                              Legend
                                                                       FULL PRIMRCY	 e
                                                                       CLflSS I, III, IV, V HEUS- 2
                                                                    tZl CLflSS II HELLS	 4
                                                                    CD NO flSSUHED flCTIVITIES	28
                                                                    0 FEDERflL PROGRRH REQUIRED- 18
I!    Ill    IV    V    VI    VII   VIII   IX    X
                REGIONS
                                                                        ** TARGETED FOR FULL PRIMACY
                                                                          IN nr-83
K)
00
 A F«d«ral program !• rtqulrtd In tho»« S1at«»
 that hav« not applied for primacy.
                                                                        • TARGETED FOR PARTIAL
                                                                          PROGRAM APPROVAL IN FY-03
TARGCTED FOR FULL PRIMACY
IN FTT-84
                                                 -45-

-------
                DEVELOPING AND REVIEWING CRITICAL REGULATIONS
             ITEM
             STATUS
CONSTRUCTION GRANTS  REGULATIONS    OFF SCHEDULE  ONE MONTH; RED BORDER
                                    DELAY.  AGENCY APPROVED FINAL RULE
                                    2/11/83.   NOW AT OMB.
404(b)(l) GUIDELINES  REVISIONS
OFF SCHEDULE  TEN  DAYS;  RED BORDER
DELAY - AWAITING  NEW ADMINISTRATOR'S
REVIEW.
NATIONAL INTERIM  PRIMARY
DRINKING WATER STANDARDS
OFF SCHEDULE ONE  MONTH;  OW INTERNAL
DELAY.
BEST CONVENTIONAL  TECHNOLOGY
REGULATIONS
NPRM PUBLISHED  FIRST QUARTER.  PROGRAM
APPROVED FINAL  RULE DUE 7/15/83.
GENERAL PRETREATMENT
REGULATIONS
NPRM PUBLISHED  FIRST QUARTER.  PROGRAM
APPROVED FINAL  RULE DUE 6/15/83.
NPDES REGULATIONS  REVISIONS
PROGRAM APPROVED NPRM FIRST QUARTER.
AGENCY APPROVED  NPRM DUE 5/15/83.
WATER QUALITY STANDARDS
REGULATIONS
NPRM PUBLISHED  FIRST QUARTER.  PROGRAM
APPROVED FINAL  RULE  DUE 6/6/83.
                                   -47-

-------
             DEVELOPING  AND REVIEWING CRITICAL REGULATIONS

                           EFFLUENT -GUIDELINES

o  TWENTY-NINE  EFFLUENT  GUIDELINES WERE COVERED BY THE  AUGUST 25,  1982
   COURT-ORDERED  SCHEDULE.   THE PROGRAM IS IN COMPLIANCE  WITH THAT SCHEDULE,
   -  FOUR EFFLUENT  GUIDELINES WERE PROMULGATED ON SCHEDULE BEFORE FY 83.
   -  EIGHT EFFLUENT GUIDELINES WERE PROMULGATED ON  SCHEDULE DURING THE
      THE FIRST QUARTER  FY  83.

O  ONE EFFLUENT GUIDELINE WAS PROMULGATED ON SCHEDULE DURING THE SECOND
   QUARTER (ELECTRICAL/ELECTRONIC COMPONENTS (PHASE  I)).

O  FOUR EFFLUENT  GUIDELINES WERE PROPOSED ON SCHEDULE DURING THE SECOND
   QUARTER:
   -  COIL COATING  (CAN  MAKING SEGMENT).
   -  ELECTRICAL/ELECTRONIC COMPONENTS  (PHASE II).
   -  NONFERROUS  METALS  (PHASE I).
   -  ORGANIC CHEMICALS.

o  ONE EFFLUENT GUIDELINE (ADHESIVE/SEALANTS) WAS REMOVED FROM THE
   SCHEDULE IN  FEBRUARY.

O  BY THE END OF  FY  83,  THERE WILL BE:
      18 FINAL  EFFLUENT  GUIDELINES.
      10 PROPOSED EKFLUENT GUIDELINES.

                                   -48-

-------
EFFLUFHT GUIDELINES SCHEDULE FOR FY '03  PROPOSAL AND PROMULGATION

                        AS OF MARCH 31.  1983
Industry
Adhes I ve/Sea lants
Aluminum Forming
Battery Manufacturing
Ooil Coating (Can
Making Segment)
Copper Forming
Electrical fc Electronic
(Phase I)
Electrical fc Electronic
(Phase II)
Foundries
Inorganic Chemicals
(Phase II)
Metal Finishing
Non ferrous Metals
Forming
Nonferroua Metals
(Phase I)
Nonferrous Metals
(Phase II)
Organic & Plastics Chem
Pesticides
Pharmaceuticals
Plastics Molding and
Forming
BMP
(F.R. Date)
11/22/82
11/10/82
1/83
11/12/82
3/83
2/83
11/15/82

8/31/82

1/83

2/83
11/30/82
11/26/82


KY '83
ONDJFMAMJJAS
EXCLUDED BY PARAGRAPH 8.
•
••

•
PROMULGATED 3/83.
•
•
•
•
PROPOSED 1/83 	
•
PROPOSED 2/83, 	




FY '84
0 N D


.»

•







•
•
•

                                                                        • Proposal
                                                                        * Pronulgation

                                                                     Note: This Is the
                                                                           schedule
                                                                           approved by
                                                                           the Court on
                                                                           August 25, 1982.
                                    -49-

-------
                      MEETING  PROGRAM COMMITMENTS

                    CONSTRUCTION  GRANTS OBLIGATIONS

o  NATIONALLY, ACTUAL OBLIGATIONS FOR THE SECOND QUARTER WERE 74% OF THE
   PLANNED TARGET.  ALTHOUGH THIS IS SIGNIFICANTLY BELOW THE 85% MINIMUM
   TARGET, IT REPRESENTS A  SUBSTANTIAL IMPROVEMENT OVER THE FIRST
   QUARTER PERFORMANCE OF 54%.

o  REGIONS II, VI, VII AND  X EXCEEDED THEIR OBLIGATION TARGETS.

o  REGIONS III AND IV ACHIEVED LESS THAN 40% OF THEIR OBLIGATION TARGETS.

O  THE OFFICE OF WATER IS PROPOSING TO CHANGE ITS COMMITMENT TO GROSS
   OBLIGATIONS TO ELIMINATE THE COMPETING PRESSURES OF NET OBLIGATIONS
   AND PROMPT DEOBLIGATIONS.

                      CONSTRUCTION GRANTS OUTLAYS

O  NATIONALLY, ACTUAL OUTLAYS  FOR THE FIRST QUARTER WERE 97% OF THE
   PLANNED TARGET.

O  MOST REGIONS WERE WITHIN ^5% OF THEIR TARGET.  REGIONS IV, VIII AND X
   ACHIEVED 86%, 81% AND 86% OF THEIR RESPECTIVE TARGETS.

-------
           CONSTRUCTION GRANT PROGRAM OBLIGATIONS AND OUTLAYS
                             As Of March 31.1983
                  OBLIGATIONS
                 OUTLAYS
IO

Ul
U)
o
                1      2     3
                   QUARTERS
TARGET.,
ACTUALS
              1      2     3
                 QUARTERS
                                      -bL-

-------
                      MEETING  PROGRAM  COMMITMENTS

             CONSTRUCTION GRANTS  COMPLETIONS AND CLOSEOUTS

O  NATIONALLY THE OFFICE OF WATER ACHIEVED 94% OF ITS SECOND QUARTER
   TARGET FOR PHYSICAL COMPLETIONS.   REGIONS I, II,  VI, VII, IX AND X
   EXCEEDED THEIR TARGETS WHILE REGIONS  III, IV AND VIII ACHIEVED LESS
   THAN 75% OF THEIR TARGETS.

O  NATIONALLY, THE OFFICE OF WATER ACHIEVED 82% OF ITS SECOND QUARTER
   TARGET FOR ADMINISTRATIVE COMPLETIONS.   REGIONS I, VI, VII AND X
   EXCEEDED THEIR TARGETS WHILE REGIONS  II, III AND V ACHIEVED LESS
   THAN 75% OF THEIR TARGETS.

O  NATIONALLY, THE OFFICE OF WATER ACHIEVED 117% OF ITS SECOND QUARTER
   TARGET FOR PROJECT CLOSEOUTS.   THIS WAS A SUBSTANTIAL IMPROVEMENT OVER
   THE FIRST QUARTER PERFORMANCE  OF  74%.   REGIONS I, III, IV, VI, VII, VIII
   AND X MET OR EXCEEDED THEIR TARGETS WHILE REGION II ACHIEVED LESS
   THAN 50% OF ITS TARGET.

-------
                CONSTRUCTION GRANT COMPLETIONS/CLOSEOUTS
                            PROJECTS COMPLETED

                            As Of March 31, 1983

J-
LJ
O
01
Q_
U_
O
0

1500 -,
1250-

1000-
750-
500-
250-
0-
K>
UJ
V)
            Physical
          Completions
           1234

            QUARTERS

       DIFFERENT SCALE
Administrative
 Completions
 Project
Closeouts
 1234
   QUARTERS
   Legend
   • ACTUAL
   a TAMOET
1234
 QUARTERS
                                     -b3-

-------
                      MEETING  PROGRAM  COMMITMENTS

                             NPDES  PERMITTING

REPERMITTING

O  AT THE START OF FY 83,  EPA'S  NPDES  REPERMITTING BACKLOG INCLUDED
   APPROXIMATELY 1,175 MAJOR PERMITS AND 9,000 MINOR PERMITS.  OF THE
   1,175 BACKLOGGED MAJOR  PERMITS,  20  WERE FOR FEDERAL FACILITIES, 260
   WERE FOR MUNICIPALITIES AND 895  WERE FOR INDUSTRIAL FACILITIES.
   THE OFFICE OF WATER IS  CURRENTLY GIVING PRIORITY TO REDUCING THE
   BACKLOG OF MAJOR INDUSTRIAL PERMITS.

O  FORTY-SEVEN INDUSTRIAL  PERMITS  WERE TARGETED FOR REISSUANCE IN THE
   SECOND QUARTER.  FORTY  (INCLUDING SOME MINORS) WERE REISSUED.

O  REGIONS I AND IV EXCEEDED THEIR REPERMITTING TARGETS.

NEW PERMITS

O  THE REGIONS ISSUED 305  NEW  PERMITS  DURING THE FIRST TWO QUARTERS.
   THE AVERAGE PROCESSING  TIME FROM RECEIPT OF A COMPLETE APPLICATION
   TO PERMIT ISSUANCE WAS  THREE  MONTHS.

-------
          REDUCING REPERMITTING BACKLOG

                As Of March 31, 1983
PERMITS TO BE REISSUED
REDUCTION IN MAJOR INDUSTRIAL
      PERMIT BACKLOG






K)
5
UJ
3
0
300-
|2 250-
2
o:
£ 200-
i ««-
5E
a.
u. 100-
0
Z 50-
0<
igoo-
/ 750-
*
.* 500-
x
/ 250-
" 	 Tllll •
"•"• 	
X



1234 1234
QUARTERS QUARTERS
•DIFFERENT SCALES
• TARGET^
• ACTUALS
                         -bb-

-------
                      MEETING  PROGRAM COMMITMENTS

                             301(h)  PERMITS

O  THE OFFICE OF WATER RECEIVED SEVENTY 301(h)  APPLICATIONS PRIOR TO
   THE ORIGINAL SEPTEMBER  13,  1979  DEADLINE.

O  BEFORE THE SECOND QUARTER FY 83,  HEADQUARTERS ESTABLISHED THE PROGRAM
   AND ISSUED:
   -  TWENTY-FOUR WAIVER DECISIONS  (LARGE,  COMPLEX APPLICATIONS).
   -  SIX DRAFT PERMITS.
   -  NO FINAL PERMITS.

O  THE ORDER OFFERING DELEGATION OF  THE 301(h)  PROGRAM TO THE REGIONS
   WAS SIGNED ON DECEMBER  30,  1982.
   -  REGIONS II, IV AND X HAVE RECEIVED DELEGATION.
   -  REGIONS I, III AND IX ARE STILL EVALUATING THEIR CAPABILITY TO
      IMPLEMENT THE PROGRAM.

o  IN FY 83, FOR THE TWENTY-FOUR WAIVER DECISIONS AND SIX DRAFT PERMITS
   ISSUED, THE REGIONS ARE TARGETED TO ISSUE:
   -  NINE DRAFT PERMITS.
   -  ELEVEN FINAL PERMITS.

o  DURING THE SECOND QUARTER,  REGION X ISSUED:
   -  ONE FINAL PERMIT.

O  ONE HUNDRED AND FORTY-FOUR  NEW APPLICATIONS  HAVE BEEN RECEIVED IN
   RESPONSE TO THE NEW DECEMBER 12,  1982 APPLICATION DEADLINE.  THE REGIONS
   MUST PROCESS THOSE APPLICATIONS  EVEN THOUGH  TARGETS WERE NOT DEVELOPED
   FOR THEM.

o  THE FY 83 DRAFT AND FINAL PERMIT TARGETS ARE NOT GOOD INDICATORS OF PROGRAM
   PROGRESS AND MAY BE TOO HIGH GIVEN CURRENT REGULATORY PROCEDURES.  THE
   REGIONS ARE ACCOMPLISHING MORE THAN THE TARGETS INDICATE.  THE OFFICE OF
   POLICY AND RESOURCE MANAGEMENT IS WORKING WITH THE OFFICE OF WATER
   TO TRY TO STREAMLINE THE PROCESS AND TO IDENTIFY BETTER INDICATORS
   OF PROGRAM PROGRESS.


                                   -bb-

-------
•o
00
>
    40-i
    30-
    20-
    10-
                                   301( H ) PERMITS

                                 As Of March 31,1983
                         PERMITS TO BE ISSUED
                                  n
                        II
   III
REGIONS
                                    BACKLOG REDUCTION
                                   70
                                   60-
                                   50-
                                   40-
                                   30-
                                   20-
                                   10-
IX
                    Legend
          •§ FINAL PERMITS COMPLETED
          Z2 FINAL PERMITS TAftQETED FOR FT 1M3
          O PERMIT •ACKLOO
                                                                        1234
                                                                        QUARTERS
                                         ACTUAL
                                         TARGET
                                            -57-

-------
                               ENFORCEMENT

GENERAL

o  THE NATIONAL MUNICIPAL  POLICY  IS  IN  DRAFT FORM.   THE FINAL HAS BEEN
   DELAYED TO PROVIDE THE  NEW  ADMINISTRATOR THE OPPORTUNITY TO REVIEW
   IT.

o  THE FINAL NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES)
   REGULATION WILL  INCLUDE AND REQUIRE  THE USE OF THE NEW NATIONAL
   DEFINITION OF SIGNIFICANT NON-COMPLIANCE IN REPORTING COMPLIANCE
   RATES.  FINAL PROMULGATION  IS  EXPECTED IN NOVEMBER, 1984.

o  MOST REGIONS AND ALL BUT NINE  STATES ARE VOLUNTARILY USING THE NEW
   DEFINITION OF SIGNIFICANT NON-COMPLIANCE IN REPORTING COMPLIANCE
   RATES.

o  THE OFFICE OF POLICY AND RESOURCE MANAGEMENT IS WORKING WITH THE
   OFFICE OF WATER  TO CONSIDER THE BEST WAY TO EXPAND COVERAGE OF THE
   MANAGEMENT ACCOUNTABILITY SYSTEM  TO  PROVIDE A MORE REPRESENTATIVE
   PICTURE OF MAJOR SOURCE COMPLIANCE.

MUNICIPALS

o  THERE ARE APPROXIMATELY:
   -  3,500 MAJOR MUNICIPAL FACILITIES.
   -  2,400 MAJOR MUNICIPAL FACILITIES  ON FINAL EFFLUENT LIMITS.
   -  800 MAJOR 92-500 MUNICIPAL  FACILITIES ON FINAL EFFLUENT LIMITS.

o  THE SECOND QUARTER COMPLIANCE  RATE FOR.MAJOR 92-500 MUNICIPALS ON
   FINAL EFFLUENT LIMITS WAS 88%.

o  DURING THE FIRST TWO QUARTERS, EPA MADE 229 COMPLIANCE INSPECTIONS
   OF MAJOR MUNICIPAL FACILITIES  TO  CONFIRM COMPLIANCE REPORTING.
                                   -50-

-------
           COMPLIANCE RATES FOR MAJOR 92-500 MUNICIPALS
                       ON FINAL EFFLUENT LIMITS

                         At Of March 31,1983
    K>0-i
                                                    PERCENT OF All MAJOR .
                                                    MUNICIPALS MEASURED HERE
              1234

                    QUARTERS




NUMBER OF MAJOR W-500 MUNICIPALS OH HNALIFFLUIMT LIMITS .*    802
                                     -59-

-------
                               ENFORCEMENT

NON-MUNICIPALS

o  THERE ARE APPROXIMATELY:
   -  4,000 MAJOR  NON-MUNICIPAL FACILITIES.
   -  3,600 MAJOR  NON-MUNICIPAL FACILITIES ON FINAL EFFLUENT LIMITS.

O  THE SECOND QUARTER  COMPLIANCE RATE FOR MAJOR NON-MUNICIPALS ON
   FINAL EFFLUENT  LIMITS  WAS  91%.

o  DURING THE FIRST TWO QUARTERS,  EPA MADE 226 COMPLIANCE INSPECTIONS
   OF MAJOR NON-MUNICIPAL FACILITIES TO CONFIRM COMPLIANCE REPORTING.
                                   -6U-

-------
K)
           100n
            75-
        D   50-
            25-
                   COMPUANCE RATES FOR MAJOR NON-MUNICIPALS
                             ON FINAL EFFLUENT UMITS

                               As Of March 31,1983
                                                          PERCENT OF Alt MAJOR
                                                          NON-MUNICIPALS MEASURED
                                                          HERE
                           234
                           QUARTERS
       NUMBER OF MAJOR NON-MUNICIPALS ON FINAL EFFLUENT LJMITSi 3102
                                       -61-

-------
              OFFICE OF  SOLID WASTE AND EMERGENCY RESPONSE
                            TABLE OF CONTENTS
         GOAL                                               PAGE
DELEGATION TO STATES  	  64
MEETING PROGRAM COMMITMENTS	  68
ENFORCEMENT  	  74
DEVELOPING CRITICAL REGULATIONS 	  78

-------
                           DELEGATION TO  STATES

                   RCRA-C PHASE I STATE AUTHORIZATIONS

O  NEW JERSEY  OBTAINED PHASE I AUTHORIZATION DURING SECOND QUARTER,
   BRINGING THE  TOTAL TO 36.  IN ADDITION,  WEST VIRGINIA AND  D.C.
   ARE NOW IN  DRAFT STAGE.  FORTY STATES ARE TARGETED FOR PHASE  I
   AUTHORIZATION BY THE END OF FY 83.

O  FIVE STATES—VIRGIN ISLANDS, MICHIGAN,  MINNESOTA, COLORADO,
   SOUTH DAKOTA—PLAN TO GO DIRECTLY TO  FINAL AUTHORIZATION.

o  WYOMING DOES  NOT INTEND TO ADOPT THE  RCRA PROGRAM.  IN ADDITON,
   HAWAII MAY  NOT SEEK AUTHORIZATION AT  ANY LEVEL.

O  PHASE I IS  AUTHORIZED TO STATES THAT  HAVE AN ACCEPTABLE FRAMEWORK
   FOR UNDERTAKING ALL RCRA RESPONSIBILITIES, EXCEPT PERMITTING.
                                     -64-

-------
10
                        DELEGATION STATUS OF RCRA - PHASE I

                                  As Of March 31,1983
                                                                   AUTHORIZED   36
                                                                   DRAFT STAGE   8
                                                                   NONE         9
                                                                   TOTAL
                                           53
                                                                    "TARGETED FOR AUTHORIZATION
                                                                     IN FY 1983

                                                                    •TARGETED FOR DRAFT STAGE
                                                                     IN FY 1983
                                                                          Legend
                                                                        a NONE
                                                                        G9 DRAFT STAGE
                                                                        •I AUTHORIZED
                          III    IV
V    VI    VII
REGIONS
VIII   IX
                                          -6b-

-------
                           DELEGATION  TO STATES

                   KCRA-C PHASE II STATE AUTHORIZATIONS

O  THREE STATES—NEW HAMPSHIRE, KENTUCKY AND CALIFORNIA—OBTAINED
   PHASE II  AUTHORIZATION DURING SECOND QUARTER.  THIS BRINGS THE
   TOTAL TO  10.   TWENTY-THREE STATES  ARE TARGETED FOR PHASE II
   AUTHORIZATION BY THE END OF FY 83.

O  FOURTEEN  STATES—PUERTO RICO, VIRGIN ISLANDS, DELAWARE,  ILLINOIS,
   INDIANA,  MICHIGAN, MINNESOTA, OHIO,  WISCONSIN, IOWA,  KANSAS, COLORADO,
   MONTANA AND SOUTH DAKOTA—PLAN TO  GO DIRECTLY TO FINAL
   AUTHORIZATION.

O  PRELIMINARY ESTIMATES ARE THAT FINAL AUTHORIZATIONS WILL BE
   OBTAINED  BY:
   -  9 STATES IN FY 84.
   -  36 STATES  IN FY 85.

O  PHASE II  IS AUTHORIZED TO STATES THAT HAVE AN ACCEPTABLE PROGRAM FOR
   PERMITTING HAZARDOUS WASTE MANAGEMENT FACILITIES.
                                   -bfc>-

-------
                         DELEGATION STATUS OF RCRA - PHASE II

                                   As Of March 31,1983
K)
00
                           III    IV
V    VI
REGIONS
VII   VIII   IX
                                                                     AUTHORIZED   10
                                                                     DRAFT STAGE   19
                                                                     NONE         24
                                                                     TOTAL
                                            53
                                                                    •* TARGETED FOR AUTHORIZATION
                                                                      IN FY 1985
                                                                      TARGETED FOR DRAFT STAGE
                                                                      IN FY 1983
                                                                            Legend
                                                                         a NONE
                                                                         E3 DRAFT STAGE
                                                                         •I AUTHORIZED

-------
                      MEETING  PROGRAM COMMITMENTS

o  THE AUTOMATED RCRA PERMITTING  DATA PRESENTED TO THE ADMINISTRATOR   -
   IN THE FIRST QUARTER ACCOUNTABILITY REPORT WAS INACCURATE.  PERMIT
   DATA IS NOW BEING COLLECTED MANUALLY UNTIL THE HAZARDOUS WASTE DATA
   MANAGEMENT SYSTEM IS PROPERLY  ADJUSTED.   THE REVISED PERMIT NUMBERS
   ARE PRESENTED BELOW.

O  A TOTAL OF 10 RCRA PERMITS  HAVE  BEEN ISSUED NATIONALLY:
   -  2 IN REGION  III.
   -  3 IN REGION  IV.
   -  1 IN REGION  VI.
   -  1 IN REGION  VII.
   -  1 IN REGION  VIII.
   -  2 IN REGION  IX.

O  EXISTING FACILITIES  (ACTIVITY  SINCE INCEPTION OF PROGRAM IN FY 82):
   -  678 OUT OF 698 STORAGE AND  TREATMENT PERMITS HAVE BEEN CALLED
      IN.  EPA AND THE  STATES  ARE IN THE PROCESS OF REVIEWING 470
      APPLICATIONS.  TWO  PERMITS  HAVE BEEN ISSUED (CALIFORNIA).
                                 -68-

-------
                MEETING PROGRAM  COMMITMENTS (CONTINUED)

      100 OUT OF 179  INCINERATOR PERMITS HAVE BEEN CALLED IN.  EPA AND
      THE STATES ARE  IN THE  PROCESS  OF  REVIEWING 35 APPLICATIONS.
      160 OUT OF 231  LAND  DISPOSAL PERMITS HAVE BEEN CALLED IN.  EPA
      IS IN THE PROCESS OF REVIEWING 13 APPLICATIONS.  (NOTE;  EPA
      STARTED CALLING IN APPLICATIONS ONLY AFTER THE LAND DISPOSAL
      REGULATIONS BECAME EFFECTIVE ON JANUARY 26,  1983.)

o  VOLUNTARY SUBMITTALS* (ACTIVITY SINCE INCEPTION OF PROGRAM IN FY 82)
   -  78 STORAGE AND  TREATMENT APPLICATIONS HAVE BEEN RECEIVED AND
      8 PERMITS HAVE  BEEN  ISSUED.  PROCESSING TIME AVERAGED 292 DAYS.
      12 INCINERATOR  APPLICATIONS  HAVE  BEEN RECEIVED AND 1 PERMIT
      HAS BEEN ISSUED.  PROCESSING TIME AVERAGED 360 DAYS.
   -  13 LAND DISPOSAL APPLICATIONS  HAVE BEEN RECEIVED AND 1 PERMIT
      HAS BEEN ISSUED.
* INCLUDES NEW FACILITIES AND  EXPANSIONS.
                                 -69-

-------
                      MEETING PROGRAM COMMITMENTS

                      SUPERFUND REMEDIAL ACTIVITIES


O  DURING THE SECOND  QUARTER, $13.1  MILLION WAS OBLIGATED FOR  REMEDIAL
   ACTIVITIES,  INCLUDING  GENERIC FUNCTIONS SUCH AS CONTRACTS,  CORPS  OF
   ENGINEERS AGREEMENT AND TRAINING.  THIS BRINGS THE CUMULATIVE
   AMOUNT OF FY 83  REMEDIAL FUNDS OBLIGATED TO $18.3 MILLION.

   -  OF THE $13.1  MILLION,  $5.4 MILLION WAS OBLIGATED FOR:

      — REMEDIAL  INVESTIGATIONS/FEASIBILITY STUDIES (RI/FS) AT
         10 NEW SITES, BRINGING THE  FY 83 TOTAL TO 14 SITES.   THE
         SECOND QUARTER TARGET CALLED FOR RI/FS AT 20 SITES.
      — ENGINEERING  DESIGNS AT 2 NEW SITES, BRINGING THE FY 83
         TOTAL  TO  3 SITES.  THE SECOND QUARTER TARGET CALLED FOR
         ENGINEERING  DESIGNS AT 5 SITES.

      IN ADDITION,  $3.1 MILLION WAS  OBLIGATED FOR 3 INITIAL REMEDIAL MEASURES

O  NO FUNDS WERE OBLIGATED FOR REMEDIAL IMPLEMENTATION DURING  THE  SECOND
   QUARTER.  FUNDS  FOR TWO ADDITIONAL IMPLEMENTATION PROJECTS  HAD  BEEN
   PROJECTED FOR OBLIGATION.

O  REMEDIAL WORK WAS  UNDERWAY AT 71  SITES AT THE END OF THE SECOND
   QUARTER.

O  THREE COOPERATIVE  AGREEMENTS WERE AWARDED DURING THIS QUARTER,
   BRINGING THE FY  83 TOTAL TO 8.  IN ADDITION, 4 COOPERATIVE
   AGREEMENTS WERE  AMENDED.   THE 8 COOPERATIVE AGREEMENTS AND
   4 AMENDMENTS GIVE  THE  STATES THE  PROJECT LEAD FOR 42.1% OF  THE
   SUPERFUND REMEDIAL DOLLARS OBLIGATED TO DATE IN FY 83

O  THE FY 83 REMEDIAL OBLIGATION TARGET HAS BEEN REDUCED FROM  $110 MILLION
   TO $72 MILLION  DUE TO  REPROGRAMMING OF FUNDS—$33 MILLION TO FEMA
   FOR TIMES BEACH  AND $5 MILLION TO THE INTERAGENCY AGREEMENT ACCOUNT.
                                  -70-

-------
                                FY 83 SUPERFUND
                        SITE REMEDIAL ACTIVITIES INITIATED

                              As Of March 31.1983
      Remedial Investigations/
         Feasibility Studies
                                    Engineering
                                      Designs
   40 -i
 Tn_J
ui 30-
       Remedial
       Actions
      01234    0
           QUARTERS
                                    1234
                                    QUARTERS
01234
     QUARTERS
K)


?
UJ
(/}

O
       A ACTUAL SITES - FUNDS OBL.
      •• DIFFERENT SCALE

-------
                      MEETING  PROGRAM  COMMITMENTS

                      SUPERFUND REMOVAL ACTIVITIES

o  $2.5 MILLION WAS OBLIGATED  FOR  REMOVAL ACTIVITES DURING SECOND
   QUARTER, BRINGING THE  FY  83 TOTAL TO $3.6 MILLION.

O  TWO PLANNED REMOVAL ACTIVITIES  WERE INITIATED AND THREE WERE
   COMPLETED THIS QUARTER, BRINGING  THE FY 83 TOTALS TO 3 INITIATED
   AND 5 COMPLETED.

O  EIGHTEEN IMMEDIATE REMOVAL  ACTIONS  WERE INITIATED THIS QUARTER
   AND 16 ACTIONS WERE COMPLETED,  BRINGING THE FY 83 TOTALS TO 28
   INITIATED AND 34 COMPLETED.

o  EPA ALSO UNDERTOOK 157 OTHER ON-SCENE RESPONSE ACTIVITIES.
                                  -72-

-------
00
>
2
o
                   SUPERFUND REMOVAL ACTIVITIES FOR FY 83


                            As Of March 31,1983
                   INITIATED
COMPLETED
75-
50-
ce
LU
m
2
23-


0,
75-
50-

^^
..-•
,.«
9^
^ f 	 • n.
w T 1 | | O1
1234


.„••
j,**
*
«
*
	 	 * ^^*^
1234
QUARTER QUARTER
• IMMEDIATE REMOVAL
•ti*iiiltttiitiiiiii*t*t*i*t*i

• PLANNED REMOVAL

                                     -73-

-------
                                ENFORCEMENT

                      SUPERFUND ENFORCEMENT ACTIVITY^

O  DURING SECOND QUARTER, 4b2  NOTICE LETTERS WERE  ISSUED FOR 7 SITES,
   BRINGING  THE FY 83 TOTAL TO 768  NOTICE LETTERS  FOR 31 SITES.

O  NEGOTIATIONS ARE UNDERWAY WITH  RESPONSIBLE PARTIES AT 82 SITES.
   AT 21 OF  THOSE SITES, NEGOTIATIONS HAVE BEEN  SUSPENDED WHILE MORE
   INFORMATION  IS GATHERED.

O  ONE ADMINISTRATIVE ORDER ON CONSENT WAS ISSUED  DURING SECOND QUARTER,
   BRINGING  THE FY 83 TOTAL TO 114.   OF THE ADMINISTRATIVE ORDERS  ISSUED
   TO DATE,  112 WERE ISSUED ON CONSENT TO RESPONSIBLE PARTIES AT THE
   CHEM-DYNE, OHIO SITE.

O  EPA OBTAINED PRIVATE PARTY  CLEANUPS WORTH $26.4 MILLION AT THREE
   SITES.  THIS BRINGS THE FY  83 TOTAL TO CLEANUPS WORTH $62 MILLION
   AT SIX SITES.

O  EPA NEGOTIATED TWO COST RECOVERY"ACTIONS WORTH  APPROXIMATELY $300,000,
   THIS BRINGS  THE FY 83 COST  RECOVERY TOTAL TO  $14.3 MILLION AT THREE
   SITES.
                                   -74-

-------
           SUPERFUND ENFORCEMENT ACTIVITY FOR FY 83

                      As Of March 31, 1983
     160-.
     120-
  OC
  ui
  CO
      80-
      40-
>
                31
82
                          114
                              V////7/*  »»,»,i
                       «?tO'
O

-------
                               ENFORCEMENT
                        RCRA ENFORCEMENT ACTIVITY
o  ACTUAL INSPECTIONS  ARE  LAGGING BEHIND PROJECTIONS  FOR  SECOND QUARTER
   BY APPROXIMATELY  660.   DUE TO WEATHER PROBLEMS, FEWER  INSPECTIONS
   ARE GENERALLY CONDUCTED DURING THE FIRST TWO QUARTERS.   THE MAJORITY
   OF INSPECTIONS  SHOULD BE CONDUCTED DURING THE THIRD AND FOURTH
   QUARTERS.

O  ONE HUNDRED AND EIGHTEEN HANDLERS WERE FOUND TO HAVE CLASS I VIOLATIONS
   DURING THE SECOND QUARTER.  OVER HALF OF THE VIOLATORS WERE DETECTED
   IN REGION V.

O  THE REGIONS ISSUED  COMPLIANCE ORDERS TO 42 HANDLERS WITH CLASS I
   VIOLATIONS.  REGIONS  II AND VII LED WITH 11 AND 9  RESPECTIVELY.

O  THIRTY-TWO HANDLERS WITH CLASS I VIOLATIONS WERE RETURNED TO COMPLIANCE
   THROUGH FINAL ORDERS.   REGIONS II AND VI LED WITH  11 AND 8 RESPECTIVELY.

O  PRELIMINARY FIRST QUARTER DATA HAS BEEN RECEIVED FROM  MOST STATES ON
   THEIR ACTIVITIES.   IT INDICATES THAT:
   -  3394 INSPECTIONS WERE CONDUCTED.
   -  1108 HANDLERS  WERE DETECTED WITH RCRA VIOLATIONS.
      136 FORMAL ADMINISTRATIVE ORDERS REQUIRING COMPLIANCE WERE ISSUED.
                                  -76-

-------
   M
   C
   o
      4000-1
      3000-
   Q.
   W
   c
o

d
z
 •

o
      2000
      1000-
              RCRA ENFORCEMENT ACTIVITY FOR FY 1983

                          As Of March 31,1983

             INSPECTIONS

                                              150 n
          ACTUAL


          TARGET
                                                        CLASS I VIOLATORS
           COMPLIANCE ORDERS ISSUED
                  CLASS I
      lOO-i
    en
    X  50-
 K>

 00
 UJ
LQ-
                 Quarttrs
                                                   RETURNED TO COMPLIANCE
                                                         CLASSI
                                              100-i
                                              W

                                              J>

                                              •o
                                              c
                                              50-
                                                         Quarters
                                        -77-

-------
                     DEVELOPING CRITICAL REGULATIONS

O  AS A RESULT OF  RESOURCE CUTBACKS FOR RCRA, OSWER  HAS REVISED ITS
   PROGRAM PRIORITIES,  INCLUDING A CHANGE  IN THE  ECONOMIC PORTION
   OF THE REGULATORY IMPACT ANALYSIS (RIA) SCHEDULE.   THE REVISED
   REGULATORY SCHEDULE  FOCUSES ON ENVIRONMENTAL PROTECTION AND IS
   AS FOLLOWS:
   INCINERATORS
4TH QUARTER, FY  83
(POSTPONED 2 QUARTERS)
   AMENDMENTS  TO  STORAGE
2ND QUARTER, FY  84
(POSTPONED 3 QUARTERS)
   UNDERGROUND  TANKS
2ND QUARTER, FY  84
(NEW ADDITION)
   LOCATION
4TH QUARTER,  FY  83
(POSTPONED  1  QUARTER)
   LAND DISPOSAL LINER STANDARDS
4TH QUARTER,  FY  83
(ADVANCED 1 QUARTER)
   FINANCIAL  REQUIREMENTS
1ST QUARTER,  FY  84
(UNCHANGED)
                                   -78-

-------
OFFICE OF ADMINISTRATION
          -79-

-------
                        OFFICE OF ADMINISTRATION
                      MEETING PROGRAM  COMMITMENTS
ITEM
STATUS
ELECTRONIC MAIL SYSTEM
IMPLEMENTATION ON SCHEDULE.
REVIEW OF EPA PROCUREMENT
PROCEDURES REVIEW:
-  EVALUATION AND SOURCE
   SELECTION.
-  NEGOTIATION, REVIEW
   AND AWARD.
REPORTS WITH RECOMMENDATIONS  FOR
IMPROVEMENT WERE SUBMITTED  TO AA
ON SCHEDULE.
SUPERFUND COST RECOVERY
TRACKING REPORT
PROCEDURES DEVELOPED  AND REPORT
SUBMITTED TO ADMINISTRATOR
ON SCHEDULE.
PLAN AND SCHEDULE FOR  REVIEW
AND REVISION OF EPA'S  FINANCIAL
MANAGEMENT POLICIES AND
PROCEDURES
PROJECT IS ON SCHEDULE,
PERFORMANCE STANDARDS  REVIEW
COMPLETED ON SCHEDULE.
                                  -8U-

-------
                         OFFICE UF ADMINISTRATION
                   MEETING PROGRAM COMMITMENTS (cont'd)
ITEM
STATUS
REVISIONS OF GRANT REGULATIONS
PUBLICATION  OF  FINAL RULE DELAYED
TWO MONTHS DUE  TO VOLUME OF PUBLIC
COMMENTS.
     INTERGOVERNMENTAL REVIEW
     OF FEDERAL  PROGRAMS
     (40 CFR,  PART 29)

     GENERAL REGULATIONS FOR
     ASSISTANCE  PROGRAMS
     (40 CFR,  PART 30)
OA WAS MEETING  REVISED SCHEDULE,
BUT FINAL RULE  NOW DELAYED ONE
MONTH DUE TO  OGC'S QUESTION OVER
CHANGES IN  APPEALS PROCESS.
                                   -81-

-------
                      DELINQUENT ACCOUNTS  RECEIVABLE

O  REVISED PROCEDURES FOR TIMELY FOLLOW-UP  OF DELINQUENT ACCOUNTS
   WERE DEVELOPED ON SCHEDULE; HOWEVER, OA  IS UNLIKELY TO MEET  ITS END
   OF YEAR TARGET FOR REDUCING ACCOUNTS RECEIVABLE DUE OVER  90  DAYS BY
   15%.

O  THE LARGE  INCREASE IN DOLLARS PRIMARILY  REFLECTS THE SIGNIFICANT
   INCREASE  IN  GRANT REFUNDS THAT ARE  UNDER APPEAL.

O  OA HAS MADE  PROGRESS IN REDUCING THE TOTAL NUMBER OF DELINQUENT
   ACCOUNTS,  AND THIS WILL CONTINUE AS THEY WRITE OFF THOSE  CASES  AMOUNTING
   TO LESS THAN $600.
                                   -82-

-------
                REDUCTION OF DELINQUENT ACCOUNTS RECEIVABLE
                                ( OVER 90 DAYS )

                              As Of March 31,1983
                 DOLLAR AMOUNT
                                    NUMBER OF ACCOUNTS
K)
00
      §
 12     3
    QUARTER

 ACTUAL
• TOTAL
                  CRANTJIEFUNDS^UNDER jkPPEAL
                                             800
                                             600
                            400-
                                             200-
  1      2      3
      QUARTER

 TARGET
) TOTAL
  »i*»i•ni»»• i

-------
OFFICE OF POLICY AND RESOURCE MANAGEMENT
                 -85-

-------
                OFFICE OF  POLICY  AND RESOURCE MANAGEMENT
                      MEETING  PROGRAM COMMITMENTS
           ITEM
             STATUS
RED BORDER REVIEW TARGETS
MET TWO WEEK DEADLINES  FOR REVIEW
IN ONLY 14% OF CASES.   OPRM ATTRIBUTES
MUCH OF THIS DELAY TO TOP-LEVEL
MANAGEMENT CHANGES.
SUBMISSION OF FY 84  BUDGET TO
CONGRESS
DELIVERED ON SCHEDULE.
ADMINISTRATOR'S GUIDANCE  FOR
OPERATING YEAR FY  1984 AND
BUDGET YEAR FY 1985
ISSUED ON SCHEDULE.
CURRENT YEAR BUDGET ALLOWANCES
ISSUED ON SCHEDULE.
SCHEDULE FOR ENVIRONMENTAL
RESULTS INITIATIVES
SUBMITTED ON SCHEDULE.
FINAL REPORT TO OMB ON
EVALUATION OF  DISCHARGE
MONITORING REPORT
DELAYED TWO MONTHS.
                                  -B6-

-------
                OFFICE; OF POLICY AND RESOURCE MANAGEMENT
                       MEETING PROGRAM COMMITMENTS
           ITEM
              STATUS
tINAL REPORTS TO  OMB  ON
NATIONAL EMISSIONS  DATA
SYSTEMS
DELAYED THREE  MONTHS.
FINAL AGENCY POLICY  STATEMENT
ON AIR EMISSIONS  TRADING
DELAYED THREE  MONTHS DUE TO QUESTIONS
CONCERNING AIR SANCTION POLICY.
REVISED PLAN FOR TRIENNIAL
REVIEW OF INFORMATION  COLLECTED
BY THE AGENCY
COMPLETED TWO MONTHS BEHIND SCHEDULE,
DETAILED PROJECT  WORK PLANS NOT
COMPLETED.
GUIDANCE FOR  FY  84  INFORMATION
COLLECTION BUDGET.
DELAYED ONE MONTH  PENDING NECESSARY
OMB GUIDANCE.
REPORT TO CONGRESS  ON  THE COST
OF CLEAN AIR AND  CLEAN WATER
FOR 1979.
DELAYED SIX MONTHS.
                                   -87-

-------
OFFICE OF RESEARCH AND DEVELOPMENT
               -89-

-------
                   OFFICE  OF  RESEARCH AND DEVELOPMENT
                       MEETING PROGRAM COMMITMENTS
   CLIENT
          ITEM
         STATUS
ALL PROGRAMS    FIVE  YEAR RESEARCH STRATEGIES   DRAFTS PROVIDED TO AAS
                FOR REGULATORY PROGRAMS         ON SCHEDULE.
OANR
INVENTORY OF FEDERAL  RESEARCH   COMPLETED ON SCHEDULE.
ON ACID DEPOSITION
OSWER
USER'S GUIDE FOR ASSESSING
HAZARDOUS WASTE TREATMENT
AND INCINERATION FACILITIES
PUBLISHED ON SCHEDULE.
OSWER
INTERIM TECHNICAL GUIDELINES
FOR MONITORING VADOSE  ZONE
ISSUED ON SCHEDULE.
OPTS
REPORT ON ORD MONITORING IN
SUPPORT OF DALLAS  LEAD STUDY
ISSUED AHEAD OF SCHEDULE,
OPTS
FINAL PROJECT  REPORT ON TEST
OF EXAMS IN  IOWA  RESERVOIRS
ISSUED ON SCHEDULE,
OANR
REPORT ON CHEMICAL  REACTIVITY
OF PERCHLOROETHYLENE  TO
PRODUCE OZONE
ISSUED ON SCHEDULE,

-------
                    OFFICE UK RESEARCH  AND DEVELOPMENT
                 MEETING PROGRAM COMMITMENTS (CONTINUED)
   CLIENT
           ITEM
         STATUS
ALL PROGRAMS
FINAL TECHNICAL GUIDELINES
FOR DATA UUALITY ASSURANCE
DRAFT GUIDELINES HAVE
BEEN ISSUED;  FINAL ACTION
BEHIND SCHEDULE.
ALL PROGRAMS
MANAGEMENT  PLAN  FOR
IMPLEMENTING AGENCY-WIDE
O.A PROGRAM
DRAFT PLAN  NOW AVAILABLE;
FINAL ACTION  BEHIND
SCHEDULE.
ALL PROGRAMS
REVIEW OF  EXPLORATORY
RESEARCH CENTERS  •
DRAFT REPORT  SUBMITTED AFTER
MINOR DELAY.
OANR
CRITICAL ASSESSMENT DOCUMENT
ON ACID DEPOSITION
TWO MONTHS  DELAY DUE TO
LATE RECEIPT  OF MATERIAL
FROM OUTSIDE  CONTRIBUTORS.
REVISED PUBLICATION DATE
JULY 31.
OANR
DRAFT OZONE CRITERIA
DOCUMENT
FIVE MONTHS  BEHIND SCHEDULE
DUE TO POOR  CONTRACTOR
PERFORMANCE;   REVISED DATE
AUGUST 31.
OANR
DRAFT LEAD AIR  UUALITY
CRITERIA  DOCUMENT
TWO MONTHS  BEHIND SCHEDULE.
DUE TO  SCIENTIFIC CONTROVERSY,

-------
                 OFFICE OF LEGAL AND ENFORCEMENT COUNSEL
                            TABLE OF CONTENTS
         GOAL                                               PAGE
ENFORCEMENT  	 94
                                   -93-

-------
                               ENFORCEMENT

                     PROCESSING OF LITIGATION ACTIONS

o  THERE WERE  37  NEW CIVIL ACTIONS REFERRED TO  EPA  HEADQUARTERS DURING
   THE SECOND  QUARTER.

O  TWENTY-TWO  CIVIL  ACTIONS WERE REFERRED TO DEPARTMENT OF JUSTICE
   DURING THE  SECOND QUARTER.   THE TOTAL NUMBER OF  CIVIL REFERRALS TO
   DOJ THUS FAR DURING  FY 83 IS 72.

O  TEN CIVIL ACTIONS WERE RETURNED TO THE REGIONS BY  HEADQUARTERS FOR
   FURTHER DEVELOPMENT  DURING THE SECOND QUARTER.

o  DURING THE  SECOND QUARTER,  THREE NEW CRIMINAL ACTIONS WERE REFERRED
   TO EPA HEADQUARTERS,  SIX CRIMINAL ACTIONS WERE REFERRED TO DOJ, AND
   TWO CASES WERE DECLINED BY DOJ.  AT THE END  OF THE SECOND QUARTER,
   THERE WERE  NO  CRIMINAL ACTIONS PENDING AT EPA HEADQUARTERS.  THE TOTAL
   NUMBER OF CRIMINAL REFERRALS TO DOJ THUS FAR DURING FY 83 IS 9 .

-------
           60-i
           50-
                      LITIGATION ACTIONS PROCESSED BY HQ
                    From December 31,1982 To March 31,1983
                                                               Legend
                                                          CD CRIMINAL ACTIONS
                                                             CIVIL ACTIONS
 GO

 >
i O
         d)
           40-
           30-
           20-
            10-
                             o
                      UJ

-------
                               ENFORCEMENT

                        STATUS OF CIVIL REFERRALS

o  THE AVERAGE  PROCESSING TIME BY EPA HEADQUARTERS FOR CIVIL ACTIONS
   REFERRED TO  DEPARTMENT OF JUSTICE REMAINED AT 64 DAYS DURING THIS
   QUARTER, AGAIN  EXCEEDING OLEC'S TARGET OF  90 DAYS.

O  A TOTAL OF 316  CIVIL ACTIONS WERE PENDING  AT THE END OF THE SECOND
   QUARTER.  OF THE CIVIL ACTIONS PENDING,  51% HAVE BEEN FILED IN
   DISTRICT COURTS, 35% HAVE BEEN REFERRED  TO DOJ/U.S. ATTORNEYS,  AND
   14% ARE PENDING REVIEW AT EPA HEADQUARTERS.

O  SEVENTY-TWO  CIVIL ACTIONS HAVE BEEN RESOLVED DURING FY 83:
      34 ACTIONS WERE SETTLED.
      5 ACTIONS WERE DISMISSED BY COURTS.
      6 ACTIONS WERE WITHDRAWN BY REGONS.
      27 ACTIONS WERE DECLINED BY EPA HEADQUARTERS, OR DOJ/U.S. ATTY.
                                   -96-

-------
ao
UJ
V)
2
O
                             CIVIL ENFORCEMENT CASES
                            Pending As Of March 31, 1983
                     EPA-HQ
                               No. Pending: 44

                               Average Time
                               Pending: 64 days
                                                   Depf of Justice / US Attv
                                                70-i
35-
                                                70 -,
                                                35-
                                                       A    W   HW   T/F


                                                            Courts
                                                       A    W   HW   T/F
                                                                           flo. Pending: 109
                                                                           Mo. Pending: 163
                                            _U"7_

-------
                               ENFORCEMENT
                   OLEC POLICY AND GUIDANCE ACTIVITIES
           ITEM

ENFORCEMENT CONSENT  DECREE
TRACKING

ENFORCEMENT INDICATORS
CIVIL PENALTY/SETTLEMENT
POLICY

SETTLEMENT PROCEDURES
MODEL CONSENT  DECREE
TERMS

COORDINATING FEDERAL  AND
STATE ENFORCEMENT

INSPECTIONS BY CONTRACTORS

ENFORCEMENT/COMPLIANCE  GUIDANCE
MANUALS (INCLUDING COMPENDIUM OF
OPERABLE POLICIES)

-  AIR
-  WATER
-  CEKCLA
-  PESTICIDES
-  TOXICS
-  RCRA
           STATUS

DRAFT COMPLETED
ON SCHEDULE.

OFF SCHEDULE  4 MONTHS,
DRAFT NOW EXPECTED  5/83.

DRAFT COMPLETED  ON  SCHEDULE,
FINAL BY 5/83.

DRAFT COMPLETED  ON  SCHEDULE,
DOJ COMMENTS  ARE PENDING.

DRAFT COMPLETED  ON  SCHEDULE,
FINAL BY 5/83.

DRAFT COMPLETED  ON  SCHEDULE,
REDRAFT BY 5/83.

COMPLETED ON  SCHEDULE.
ON SCHEDULE
ON SCHEDULE
ON SCHEDULE
ON SCHEDULE
ON SCHEDULE
ON SCHEDULE

-------