STRENGTHENING PARTNERSHIPS WITH STATES
DELEGATION TO STATES
NEW SOURCE PERFORMANCE STANDARDS AND
NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS
o VERY LITTLE DELEGATION WAS ACCOMPLISHED DURING THE FIRST QUARTER.
NO NEW NSPS OR NESHAPS WERE DUE FOR DELEGATION DURING THE QUARTER.
O REGION I DELEGATED TWO NESHAPS ASBESTOS CATEGORIES TO VERMONT.
o REGION VII DELEGATED TWO NSPS CATEGORIES TO MISSOURI.
O WISCONSIN HAS ADOPTED AUTOMATIC DELEGATION FOR BOTH NSPS AND
NESHAPS, REPLACING THE MUCH SLOWER PROCESS OF ADOPTING DUPLICATE
REGULATIONS.
-24-
-------
DELEGATION STATUS OF NSPS AND NESHAPS
As of December 31,1983
100
1
75-
O 50
w o
GOAL
I II
IV V VI VII VIR IX X
REGIONS
Legend
CO NSPS
NESHAPS
-25-
-------
OFFICE OF WATER
TABLE OF CONTENTS
GOAL PAGE
ENFORCEMENT 29
MEETING PROGRAM COMMITMENTS 42
DEVELOPING AND REVIEWING CRITICAL REGULATIONS 54
DELEGATION TO STATES 58
-27-
-------
ENFORCEMENT
GENERAL
O THE OFFICE OF WATER HAS RECENTLY MADE MAJOR MODIFICATIONS IN THE
REPORTING OF WATER COMPLIANCE AND ENFORCEMENT INFORMATION IN PREPARATION
FOR TRACKING IMPLEMENTATION OF THE NATIONAL MUNICIPAL POLICY.
O THE REVISED REPORTING WAS DESIGNED TO COVER THE COMPLIANCE STATUS
OF ALL MAJOR MUNICIPAL AND NON-MUNICIPAL PERMITTEES IN FY 1984.
THE OFFICE OF WATER INTENDS TO VERIFY THE QUALITY OF THE REPORTING
OVER THE NEXT QUARTER TO MAKE SURE ALL MAJOR PERMITTEES ARE
APPROPRIATELY INCLUDED.
o THE KEY FOCUS OF THE PROGRAM IS ON SIGNIFICANT NONCOMPLIERS. A
FACILITY IS CONSIDERED TO BE IN SIGNIFICANT NONCOMPLIANCE FOR ANY
OF THE FOLLOWING TYPES OF VIOLATIONS WHICH HAVE NOT BEEN CORRECTED
BY THE END OF THE REPORTING PERIOD:
- FACILITIES VIOLATING REQUIREMENTS OF PREVIOUS ENFORCEMENT
ACTIONS OR COMPLIANCE SCHEDULES.
- FACILITIES IN VIOLATION OF PERMIT EFFLUENT LIMITS FOR:
— SINGLE EVENTS AND SHORT-TERM LIMITS THAT HAVE THE POTENTIAL
TO CAUSE ADVERSE ENVIRONMENTAL OR HEALTH IMPACTS.
— VIOLATIONS OF MONTHLY AVERAGE PERMIT LIMITS, FOR ANY TWO
MONTHS IN A SIX-MONTH PERIOD, THAT EXCEED THE LIMIT FOR
NONTOXIC POLLUTANTS BY 40% OR THE LIMIT FOR TOXIC POLLUTANTS
BY 20%.
— VIOLATIONS OF MONTHLY AVERAGE LIMITS FOR ANY FOUR MONTHS IN
A SIX-MONTH PERIOD.
o COMPLIANCE AND INSPECTION COMMITMENTS HAVE NOT BEEN FINALIZED FOR
ALL REGIONS.
o REGION VI'S FIRST QUARTER COMPLIANCE REPORT WAS NOT RECEIVED IN
TIME TO INCLUDE IT IN THIS REPORT.
-29-
-------
ENFORCEMENT
NON-MUNICIPALS
o THERE ARE APPROXIMATELY:
- 3,700 MAJOR NON-MUNICIPAL PERMITTEES.
- 3,188 OF WHICH ARE COVERED IN THIS REPORT.
- 2,917 OR 91% ARE NOT IN SIGNIFICANT NONCOMPLIANCE.
- 271 OR 9% ARE IN SIGNIFICANT NONCOMPLIANCE.
o NATIONALLY, 206 OR 6% OF THE 3,463 INSPECTIONS OF MAJOR NON-MUNICIPAL
FACILITIES TARGETED FOR FY 84 WERE COMPLETED DURING THE FIRST QUARTER.
o THERE WERE NO EPA INSPECTIONS IN REGIONS II, III, IX AND X. THERE
WERE NO INSPECTIONS BY THE STATES IN REGION II.
MUNICIPALS
o THERE ARE APPROXIMATELY:
- 3,600 MAJOR MUNICIPAL PERMITTEES.
- 3,179 OF WHICH ARE COVERED IN THIS REPORT.
- 2,540 OR 80% ARE NOT IN SIGNIFICANT NONCOMPLIANCE.
- 639 OR 20% ARE IN SIGNIFICANT NONCOMPLIANCE.
o NATIONALLY, 251 OR 7% OF THE 3,665 INSPECTIONS OF MAJOR MUNICIPAL
FACILITIES TARGETED FOR FY 84 WERE COMPLETED DURING THE FIRST QUARTER.
o THERE WERE NO EPA INSPECTIONS IN REGIONS II, III AND IX.
-------
COMPLIANCE STATUS
NPDES FACILITIES
As of December 31,1983
NON-MUNICIPAL MUNICIPAL
COMPLIANCE
91.0X
V_^x
NOf
20.0%
NUMBER OF FACILITIES NUMBER OF FACILITIES
IN THE UNIVERSE: 3188 IN THE UNIVERSE: 3179
HI
-------
ENFORCEMENT
NON-MUNICIPAL COMPLIANCE
O 94% OF THE MAJOR NON-MUNICIPAL PERMITTEES HAVE COMPLETED THE
CONSTRUCTION NEEDED TO ACHIEVE THE FINAL EFFLUENT LIMITS IN THEIR
EXISTING PERMITS AND ARE CONSIDERED TO BE "ON FINAL EFFLUENT LIMITS."
O 6% NEED CONSTRUCTION TO MEET THEIR FINAL EFFLUENT LIMITS AND ARE "ON
CONSTRUCTION SCHEDULES AND/OR INTERIM EFFLUENT LIMITS."
NON-MUNICIPALS ON FINAL EFFLUENT LIMITS
(SEE CHART, FOLLOWING PAGE, LEFT SIDE)
O NATIONALLY, OWEP ACHIEVED A COMPLIANCE RATE OF 92% FOR MAJOR NON-
MUNICIPALS ON FINAL EFFLUENT LIMITS AGAINST A 92% TARGET.
O REGION VIII MISSED ITS COMPLIANCE TARGET FOR NON-DELEGATED STATES
BY 8%. ALL OTHER REGIONS MET OR EXCEEDED THEIR TARGETS FOR NON-
DELEGATED STATES.
O 8% ARE IN SIGNIFICANT NONCOMPLIANCE:
- 7% ARE IN SIGNIFICANT NONCOMPLIANCE DUE TO O & M PROBLEMS
WHICH CAN BE CORRECTED WITHOUT CONSTRUCTION.
- 1% OF THE FACILITIES HAVE BECOME OVERLOADED AND REQUIRE
ADDITIONAL CONSTRUCTION TO RETURN THEM TO COMPLIANCE.
NON-MUNICIPALS ON CONSTRUCTION SCHEDULES AND/OR INTERIM EFFLUENT LIMITS
(SEE CHART, FOLLOWING PAGE, RIGHT SIDE)
O 82% OF THE MAJOR NON-MUNICIPALS ON CONSTRUCTION SCHEDULES AND/OR INTERIM
EFFLUENT LIMITS ARE NOT IN SIGNIFICANT NONCOMPLIANCE.
O 18% ARE IN SIGNIFICANT NONCOMPLIANCE:
- 10% ARE IN SIGNIFICANT NONCOMPLIANCE WITH THEIR CONSTRUCTION SCHEDULES.
- 8% ARE IN SIGNIFICANT NONCOMPLIANCE WITH THEIR INTERIM EFFLUENT
LIMITS THOUGH NOT SIGNIFICANTLY VIOLATING ANY CONSTRUCTION SCHEDULE.
-------
COMPLIANCE STATUS
MAJOR NON-MUNICIPALS
As of December 31, 1983
ON FINAL EFFLUENT LIMITS
7% SIGNIFICANT NONCOMPLIANCfc
NO CONSTRUCTION NEEDED
1% SIGNIFICANT NONCOMPLIANCE
ADDITIONAL CONSTRUCTION
NEEDED
92% COMPLIANCE
NUMBER IN UNIVERSE: 2990
94% OF MAJOR NON-MUNICIPALS
ON CONSTRUCTION SCHEDULE/
INTERIM EFFLUENT LIMITS
SIGNIFICANT NONCOMPLIANCE WITH
CONSTRUCTION SCHEDULE
-SltiNlNcANt NONCOMPLIANCE
WftH INTERIM LIMITS
COMPLIANCE
10%
NUMBER IN UNIVERSE: 198
6% OF MAJOR NON-MUNICIPALS
-33-
-------
ENFORCEMENT
REDUCING THE NUMBER OF MAJOR NON-MUNICIPALS
IN SIGNIFICANT NONCOMPLIANCE
o NATIONALLY, THERE WERE 277 MAJOR NON-MUNICIPAL FACILITIES IN SIGNIFICANT
NONCOMPLIANCE (SNC) WITH FINAL EFFLUENT LIMITS AT THE START OF FY 1984.
- 101 FACILITIES WERE RETURNED TO COMPLIANCE DURING THE FIRST
QUARTER AND ENFORCEMENT ACTIONS WERE TAKEN AGAINST 30 OTHERS —
0 BY EPA AND 30 BY THE DELEGATED STATES.
- NATIONALLY, OWEP ACHIEVED 185% OF ITS FIRST QUARTER SNC
REDUCTION TARGET. ALL REGIONAL AND DELEGATED-STATE TARGETS
WERE MET OR EXCEEDED.
o NATIONALLY, THERE WERE 40 MAJOR NON-MUNICIPAL FACILITIES IN SIGNIFICANT
NONCOMPLIANCE (SNC) WITH CONSTRUCTION SCHEDULES/INTERIM EFFLUENT
LIMITS AT THE START OF FY 1984.
- 7 FACILITIES WERE RETURNED TO COMPLIANCE DURING THE FIRST
QUARTER AND ENFORCEMENT ACTIONS WERE TAKEN AGAINST 12 OTHERS —
5 BY EPA AND 7 BY THE DELEGATED STATES.
- NATIONALLY, OWEP ACHIEVED 190% OF ITS FIRST QUARTER SNC
REDUCTION TARGET. ALL REGIONAL AND DELEGATED-STATE TARGETS
WERE MET OR EXCEEDED WITH THE EXCEPTION OF THE DELEGATED
STATES IN REGION VIII.
-34-
-------
REDUCING NUMBER OF MAJOR NON-MUNICIPALS
IN SIGNIFICANT NONCOMPLJANCE
As of December 31,1983
I
I
WITH FINAL
EFFLUENT UMIT5
PEMDINO
TARGET
BOY 1 234
QUARTER
Legend
CD RETURNED TO COMPLIANCE
E2 ENFORCEMENT ACTION TAKEN
• PENDING
WITH CONSTRUCTION
SCHEDULMNTERIM UMTTS
BOY 1 2 3 4
QUARTER
PENDING
TARGET
-------
ENFORCEMENT
MUNICIPAL COMPLIANCE
O 62% OF THE MAJOR MUNICIPAL PERMITTEES HAVE COMPLETED THE CONSTRUCTION
NEEDED TO ACHIEVE THE FINAL EFFLUENT LIMITS IN THEIR EXISTING PERMITS
AND ARE CONSIDERED TO BE "ON FINAL EFFLUENT LIMITS."
O 38% NEED CONSTRUCTION TO MEET THEIR FINAL EFFLUENT LIMITS AND ARE "ON
CONSTRUCTION SCHEDULES AND/OR INTERIM EFFLUENT LIMITS."
MUNICIPALS ON FINAL EFFLUENT LIMITS
(SEE CHART, FOLLOWING PAGE, LEFT SIDE)
o NATIONALLY, OWEP ACHIEVED A COMPLIANCE RATE OF 84% FOR MAJOR MUNICIPALS
ON FINAL EFFLUENT LIMITS AGAINST AN 86% TARGET.
o HOWEVER, REGION VIII AND X WERE THE ONLY REGIONS TO MEET THEIR
TARGETS FOR NON-DELEGATED STATES.
o 16% ARE IN SIGNIFICANT NONCOMPLIANCE:
- 13% ARE IN SIGNIFICANT NONCOMPLIANCE DUE TO O & M PROBLEMS WHICH CAN
BE CORRECTED WITHOUT CONSTRUCTION.
- 3% OF THE FACILITIES HAVE BECOME OVERLOADED AND REQUIRE ADDITIONAL
CONSTRUCTION TO RETURN THEM TO COMPLIANCE.
o NATIONALLY, OWEP ACHIEVED A COMPLIANCE RATE OF 87% FOR MAJOR 92-500
MUNICIPALS ON FINAL EFFLUENT LIMITS AGAINST AN 88% TARGET.
MUNICIPALS ON CONSTRUCTION SCHEDULES AND/OR INTERIM EFFLUENT LIMITS
(SEE CHART, FOLLOWING PAGE, RIGHT SIDE)
O 73% OF THE MAJOR MUNICIPALS ON CONSTRUCTION SCHEDULES AND/OR INTERIM
EFFLUENT LIMITS ARE NOT IN SIGNIFICANT NONCOMPLIANCE.
O 27% ARE IN SIGNIFICANT NONCOMPLIANCE:
- 9% ARE IN SIGNIFICANT NONCOMPLIANCE WITH THEIR CONSTRUCTION SCHEDULES.
- 18% ARE IN SIGNIFICANT NONCOMPLIANCE WITH THEIR INTERIM EFFLUENT
LIMITS THOUGH NOT SIGNIFICANTLY VIOLATING ANY CONSTRUCTION SCHEDULE.
-------
COMPLIANCE STATUS
MAJOR MUNICIPALS
As of December 31,1983
ON FINAL EFFLUENT LIMITS
13% SIGNIFICANT NONCOMPLIANCE
NO CONSTRUCTION NEEDED —
3% SIGNIFICANT NONCOMPLIANCE
ADDTTIONAL CONSTRUCTION
NEEDED
64% COMPLIANCE
o
ON CONSTRUCTION SCHEDULE
INTERIM EFFLUENT LIMITS
— SIGNIFICANT NONCOM>UANCE
WITH CONSTRUCTION SCHEDULE 9%
SldNlhfcANt NONCOMPLIANCE
WfTH INTERIM UMITS
n%
NUMBER IN UNIVERSE: 1967
62% OF MAJOR MUNICIPALS
NUMBER IN UNIVERSE: 122*
38% OF MAJOR MUNICIPALS
-37-
-------
ENFORCEMENT
REDUCING THE NUMBER OF MAJOR MUNICIPALS
IN SIGNIFICANT NONCOMPLIANCE
o NATIONALLY, THERE WERE 307 MAJOR MUNICIPAL FACILITIES IN SIGNIFICANT
NONCOMPLIANCE (SNC) WITH FINAL EFFLUENT LIMITS AT THE START OF FY 1984
- 60 FACILTIES WERE RETURNED TO COMPLIANCE DURING THE FIRST QUARTER
AND ENFORCEMENT ACTIONS WERE TAKEN AGAINST 31 OTHERS — 4 BY EPA
AND 27 BY THE DELEGATED STATES.
- NATIONALLY, OWEP ACHIEVED 182% OF ITS FIRST QUARTER SNC REDUCTION
TARGET. ALL REGIONAL AND DELEGATED-STATE TARGETS WERE MET OR
EXCEEDED.
o NATIONALLY, THERE WERE 370 MAJOR MUNICIPAL FACILITIES IN SIGNIFICANT
NONCOMPLIANCE (SNC) WITH CONSTRUCTION SCHEDULES/INTERIM EFFLUENT
LIMITS AT THE START OF FY 1984.
- 71 FACILITIES WERE RETURNED TO COMPLIANCE DURING THE FIRST
QUARTER AND ENFORCEMENT ACTIONS WERE TAKEN AGAINST 31 OTHERS —
7 BY EPA AND 24 BY THE DELEGATED-STATES,
- NATIONALLY, OWEP ACHIEVED 243% OF ITS FIRST QUARTER SNC REDUCTION
TARGET. ALL REGIONAL AND DELEGATED STATE TARGETS WERE MET OR
EXCEEDED.
-38-
-------
REDUCING NUMBER OF MAJOR MUNICIPALS
IN SIGNIFICANT NONCOMPUANCE
As of December 31,1983
WITH FINAL
EFFUJEKT UMITS
BOY
1 2
QUARTER
PENDING
TARGET
WITH CONSTRUCTION
SCHEDUli/NTERIM UMITS
BOY
1 2 3
QUARTER
PENDING
TARGET
Legend
CJ RETURNED TO COMPLIANCE
E2 ENFORCEMENT ACTION TAKEN
•I PENDING
-------
ENFORCEMENT
REDUCING THE NUMBER OF MAJOR FEDERAL FACILITIES
IN SIGNIFICANT NONCOMPLIANCE
O NATIONALLY, THERE WERE 18 MAJOR FEDERAL FACILITIES IN SIGNIFICANT
NONCOMPLIANCE (SNC) WITH FINAL EFFLUENT LIMITS AT THE START OF FY 1984
- THREE FACILITIES WERE RETURNED TO COMPLIANCE.
- NATIONALLY, OWEP MISSED ITS SNC REDUCTION TARGET BY ONE.
O NATIONALLY, THERE WERE 4 MAJOR FEDERAL FACILITIES IN SIGNIFICANT
NQNCOMPLIANCE (SNC) WITH CONSTRUCTION SCHEDULES/INTERIM EFFLUENT
LIMITS AT THE START OF FY 1984.
- ONE FACILITY WAS RETURNED TO COMPLIANCE EVEN THOUGH
NONE WERE TARGETED FOR COMPLIANCE.
O REGION IV FAILED TO PROVIDE ANY TARGETS OR FIRST QUARTER INFORMATION
FOR FEDERAL FACILITY COMPLIANCE.
-------
REDUCING NUMBER OF FEDERAL FACILITIES
IN SIGNIFICANT NONCOMPUANCE
As of December 31,1983
Wf!H FINAL
EFFLUENT UMfTS
WTTH CONSTRUCTION
UMTTS
PENOINQ
TARGET
BOY
1 2
QUARTER
Legend
C=] RETURNED TO COMPLIANCE
§• PENDING
PCNDINQ
TARGET
BOY
1 2
QUARTER
-41-
-------
MEETING PROGRAM COMMITMENTS
CONSTRUCTION GRANTS OBLIGATIONS
O NATIONALLY, ACTUAL GROSS OBLIGATIONS WERE 92% OF THE FIRST QUARTER
OBLIGATION TARGET - WELL WITHIN THE EXPECTED RANGE OF +; 15%.
O REGIONS II, V, VII, VIII AND IX MET THEIR GROSS OBLIGATION TARGETS
WITHIN THE + 15% WINDOW.
O REGION VI ACHIEVED 174% OF ITS TARGET. REGION VI EXCEEDED THE 15%
WINDOW WITH HEADQUARTERS CONCURRENCE TO HELP MEET THE NATIONAL TARGET
O REGIONS I, III, IV AND X ACHIEVED 75%, 69%, 82% AND 11% OF THEIR
RESPECTIVE TARGETS.
CONSTRUCTION GRANTS OUTLAYS
O NATIONALLY, ACTUAL OUTLAYS FOR THE FIRST QUARTER WERE 102% OF THE
PLANNED TARGET - WELL WITHIN THE EXPECTED RANGE OF + 5%.
o SEVEN REGIONS MET THEIR OUTLAY TARGETS WITHIN THE + 5% WINDOW.
o REGIONS II, VIII AND X EXCEEDED THE 5% WINDOW BY 2% OR 3% WITH
HEADQUARTERS CONCURRENCE.
-42-
-------
CONSTRUCTION GRANT PROGRAM OBLIGATIONS AND OUTLAYS
As of December 31, 1983
OBLIGATIONS OUTLAYS
3000-
2500-
^^^
J"^^
2000-
5
2
<§> 1500-
tf\
Of
d 1000-
500-
s °J
f 3000-
/
/ 2500-
^
^^
•
/ 2000-
/
/ 1500-
•
t
j
/ 1000-
**
jf wo-
k^
s
/
*
«
#
Jf
•'
/
/
^ f
•
V*
/
-#
V
§ 1234 1234
uj QUARTERS L»g«nd QUARTERS
• ACTUAL
-------
MEETING PROGRAM COMMITMENTS
CONSTRUCTION GRANTS ADMINISTRATIVE COMPLETIONS
o NATIONALLY, OWPO ACHIEVED 102% OF ITS FIRST QUARTER TARGET FOR
ADMINISTRATIVE COMPLETIONS.
o REGIONS VI, VII AND X EXCEEDED THEIR RESPECTIVE TARGETS BY 30%,
42% AND 78%.
o REGIONS V, VIII AND IX ACHIEVED EXACTLY 100% OF THEIR RESPECTIVE
TARGETS.
o REGIONS I, II, III AND IV ACHIEVED 55%, 67%, 56% AND 93% OF THEIR
RESPECTIVE TARGETS.
CONSTRUCTION GRANTS PROJECT CLOSEQUTS
o NATIONALLY, OWPO ACHIEVED 115% OF ITS FIRST QUARTER TARGET FOR
PROJECT CLOSEOUTS.
o REGIONS III, IV, V, VI, VII AND X EXCEEDED THEIR RESPECTIVE TARGETS
BY 33%, 61%, 5%, 120%, 7% AND 14%.
o REGIONS I, II, VIII AND IX ACHIEVED 35%, 65%, 89% AND 96% OF THEIR
RESPECTIVE TARGETS.
-44-
-------
CONSTRUCTION GRANT COMPUTONS/CUOSEOUTS
PROJECTS COMPLETED
As Of December 31,1983
wo
1
•nrraeirscMt
QUARIBRS
780
600-
LEGEND
| ACTUAL
QTAMtT
ClOMOUtt
•
I
t
*
QUARTERS
wwwtrea
-------
MEETING PROGRAM COMMITMENTS
NON-MUNICIPAL REPERMITTING BY EPA
o AT THE START OF FY 1984, EPA'S NPDES REPERMITTING BACKLOG INCLUDED
507 MAJOR NON-MUNICIPAL PERMITS. 103 ADDITIONAL PERMITS WILL EXPIRE
DURING FY 1984 FOR A TOTAL OF 610 PERMITS TO BE REISSUED.
o OWEP PLANS TO REISSUE 384 MAJOR NON-MUNICIPAL PERMITS FOR A TOTAL
BACKLOG REDUCTION OF 63% BY THE END OF FY 1984.
o NATIONALLY, 42 PERMITS WERE REISSUED BY EPA DURING THE FIRST QUARTER -
11% OF THE END-OF-YEAR TARGET. REGIONS II AND III ACHIEVED 25% AND
100% OF THEIR RESPECTIVE END-OF-YEAR TARGETS.
MUNICIPAL REPERMITTING BY EPA
o AT THE START OF FY 1984, EPA'S NPDES REPERMITTING BACKLOG INCLUDED
224 MAJOR MUNICIPAL PERMITS. Ill ADDITIONAL PERMITS WILL EXPIRE
DURING FY 1984 FOR A TOTAL OF 335 PERMITS TO BE REISSUED.
o OWEP PLANS TO REISSUE 201 MAJOR MUNICIPAL PERMITS FOR A TOTAL BACKLOG
REDUCTION OF 60% BY THE END OF FY 1984.
o NATIONALLY, 14 PERMITS WERE REISSUED BY EPA DURING THE FIRST QUARTER -
7% OF THE END-OF-YEAR TARGET. REGION X ACHIEVED 38% OF ITS END-OF-YEAR
TARGET.
NEW PERMITS ISSUED BY EPA
o REGIONS I, IV, VI AND X TOGETHER HAD 216 NEW NPDES PERMIT APPLICATIONS
ON HAND AT THE BEGINNING OF FY 1984. THEY ISSUED 17 NEW PERMITS DURING
THE FIRST QUARTER.
o OF THE 216 APPLICATIONS, 160 IN REGION X AND 9 IN REGION VI HAD BEEN
PENDING MORE THAN 12 MONTHS. REGION VI REDUCED ITS NUMBER PENDING
MORE THAN 12 MONTHS TO 6 DURING THE FIRST QUARTER.
-Afi-
-------
400
350
25°
fe 200
150
K>0
50-
NPDES REPERMimNG BY EPA
As of December 31,1983
NON-MUNICIPAL MUNICIPAL
/
400
530-
fe MO
150
100
1234
QUARTERS
• ACTUAL
1234
QUARTERS
NUMBER WHICH EXPIRED
OR WILL EXPIRE BYi
EOY 8 3 - 507
BOY 04 - 610
224
995
-------
MEETING PROGRAM COMMITMENTS
NON-MUNICIPAL REPERMITTING BY THE DELEGATED STATES
O AT THE START OF FY 1984, THE NPDES REPERMITTING BACKLOG FOR DELEGATED
STATES INCLUDED 1,574 MAJOR NON-MUNICIPAL PERMITS. 169 ADDITIONAL
PERMITS WILL EXPIRE DURING FY 1984 FOR A TOTAL OF 1,743 PERMITS TO BE
REISSUED.
o THE NPDES-DELEGATED STATES REISSUED 59 NON-MUNICIPAL PERMITS DURING
THE FIRST QUARTER - 31 OF THE 59 WERE REISSUED BY STATES IN REGION IV.
MUNICIPAL REPERMITTING BY THE DELEGATED STATES
o AT THE START OF FY 1984, THE NPDES REPERMITTING BACKLOG FOR DELEGATED
STATES INCLUDED 717 MAJOR MUNICIPAL PERMITS. 422 ADDITIONAL PERMITS
WILL EXPIRE DURING FY 1984 FOR A TOTAL OF 1,139 PERMITS TO BE REISSUED.
o THE NPDES-DELEGATED STATES REISSUED 58 MUNICIPAL PERMITS DURING THE
FIRST QUARTER - 24 OF THE 58 WERE REISSUED BY STATES IN REGION V.
-------
NPDES REPERMITT1NG BY DELEGATED STATES
As of December 31, 1983
NON-MUNICIPAL MUNICIPAL
1000-
•00-
800-
f= 700-
ffi 600-
fe 500-
m 40°"
^ 300-
200-
100-
o-
700-
800-
(2 fioo-
E 400-
g 300-
J 200-
100-
••
to
1234
QUARTERS
NUMBER WHICH HAVE
EXPIRED OR WILL EXPIRE BYt
BOY 83 -
EOY 84 -
, .
Lsgend
PERMITS ISSUED
23
QUARTERS
1574
1743
717
1139
-------
MEETING PROGRAM COMMITMENTS
301(h) OCEAN DISCHARGE PERMITS
o AT THE START OF FY 1984, EPA HAD 193 301(h) APPLICATIONS.
o 2 APPLICATIONS WERE WITHDRAWN DURING THE FIRST QUARTER LEAVING
191 FOR REVIEW.
o 92 APPLICATIONS ARE CONSIDERED SUFFICIENTLY COMPLETE FOR EPA TO
REVIEW FOR INITIAL DECISIONS.
o THE OFFICE OF WATER PLANS ON ISSUING 18 301(h) PERMITS AND 26
INITIAL DECISIONS DURING FY 1984.
o FOUR PERMITS WERE ISSUED DURING THE FIRST QUARTER AGAINST A TARGET
OF 2:
- REGION II ISSUED 2 AGAINST A TARGET OF 0.
- REGION IX AND X EACH MET ITS TARGET OF 1.
o SEVEN INITIAL DECISIONS WERE ISSUED AGAINST A TARGET OF 3:
- REGION I ISSUED 3 AGAINST A TARGET OF 1.
- REGION IX ISSUED 2 AGAINST A TARGET OF 1.
- REGION X ISSUED 2 AGAINST A TARGET OF 1.
-------
301 (h) OCEAN DISCHARGE PERMITS
As of December 31,1983
50-
PERCQff OF 191
APPUCAHONS WHICH
ARE COMPLETE
Ugtnd
-------
MEETING PROGRAM COMMITMENTS
MUNICIPAL PRETREATMENT
o AT THE START OF FY 1984, APPROXIMATELY 1,314 MUNICIPALITIES NEEDED
APPROVED PRETREATMENT PROGRAMS. 934 OR 71% OF THE MUNICIPALITIES
NEEDING APPROVED PROGRAMS HAD SUBMITTED AT LEAST A PORTION OF THEIR
PROGRAM TO EPA OR THE NPDES-DELEGATED STATES FOR APPROVAL.
O THE OFFICE OF WATER HAS TARGETED 724 PROGRAMS FOR APPROVAL DURING
FY 1984 - 397 BY EPA AND 327 BY THE NPDES-DELEGATED STATES.
o NATIONALLY, 100% OF THE PROGRAMS TARGETED FOR APPROVAL DURING THE
FIRST QUARTER WERE APPROVED. EPA ACHIEVED 96% OF ITS TARGET AND
THE DELEGATED STATES, 107% OF THEIR TARGET.
o REGIONS I, IV, V, VII AND IX MET OR EXCEEDED THEIR RESPECTIVE TARGETS.
o REGIONS III AND VI ACHIEVED 50% AND 88% OF THEIR RESPECTIVE TARGETS.
O THIRTY-EIGHT ADMINISTRATIVE ORDERS CONTAINING SCHEDULES FOR SUBMITTING
PRETREATMENT PROGRAMS WERE ISSUED DURING THE FIRST QUARTER - 14 BY
EPA AND 24 BY THE DELEGATED STATES.
-52-
-------
MUNICIPAL PRETREA7MENT
PROGRAM APPROVALS
As of December 31,1983
800
700
•00-
500-
400
300-
200-
100-
A<
VI
*
/
/
/
/
/
P
/
/
/
,4
s
^
~ 1 I 1 1
1254
QUARTER
NUMBER OF
AOifSSUEOj 38
PERCENT OF PROGRAMS kt
TARGETIED FOR APPROVAL IN
FY84
• ACTUAL
Haaa—
-------
DEVELOPING AND REVIEWING CRITICAL REGULATIONS
EFFLUENT GUIDELINES
O AT THE BEGINNING OF FY 1984, ELEVEN OF THE ORIGINAL TWENTY-NINE
EFFLUENT GUIDELINES COVERED BY THE COURT-ORDERED SCHEDULE STILL
NEEDED TO BE PROMULGATED.
o TWO EFFLUENT GUIDELINES WERE PROMULGATED DURING THE FIRST QUARTER;
- COIL COATING (CAN MAKING SEGMENT).
- ELECTRICAL AND ELECTRONIC (PHASE II).
o OF THE REMAINING NINE EFFLUENT GUIDELINES:
- 1, THE PESTICIDES REGULATION, IS OFF SCHEDULE. THE COURT
HAS APPROVED A REVISION TO THE SCHEDULE WHICH THE OFFICE
OF WATER WILL SUBMIT SOON.
- 8 HAD NO FIRST QUARTER MILESTONES FOR TRACKING PROGRESS.
_C A
-------
EFFLUENT GUIDELINES SCHEDULE FOR FY 83 PROPOSAL AND PROMULGATION
AS OF SEPTEMBER 30, 1983
Industry
Battery Manufacturing
Coil Coating (Can
Making Segment)
Electrical & Electronic
(Phase II)
Foundries
Inorganic Chemicals
(Phase II)
Nonferrous Metals
Forming
Nonferrous Metals
(Phase I)
Nonferrous Metals
(Phase II)
Organic & Plastics Chem
Pesticides
Plastics Molding and
Forming
PROPOSAL
RMP
10/82
1/83
2/83
10/82
9/83
1/83
2/83
11/82
FY '84
ONDJFMAMJJAS
o
PROMULGATED 11/83.
PROMULGATED 12/83.
4 o
o
0
O
o
tt o
0 0
FY '85
0 N D
o
0 Proposal
o Promulgation
-55-
-------
DEVELOPING AND REVIEWING CRITICAL REGULATIONS
AS OF DECEMBER 31, 1983
REGULATION
GENERAL PRETREATMENT
(REMOVAL CREDITS)
BEST CONVENTIONAL
TECHNOLOGY
WATER QUALITY
STANDARDS
NPDES (LITIGATION
PKG.)
AMENDMENT TO
SECONDARY TREATMENT
UIC DIRECT
INORGANIC AND ORGANIC
COMPOUNDS & MICRO-
BIOLOGICAL
CONTAMINANTS REVISION
FLUORIDE REVISION
MCLs FOR VOLATILE
ORGANIC CHEMICALS
DEFINITION OF
SIGNIFICANT
NONCOMPLIANCE
PROPOSAL
DUE DATE
9/28/82*
12/29/82*
10/29/82*
11/18/82*
11/30/83
9/02/83*
9/30/84
4/15/84
2/15/84
2/20/84
PROMULGATION
DUE DATE
1/15/84
4/30/84
9/30/83
3/01/84
9/30/84
2/27/84
9/30/85
1/15/85
12/15/84
9/24/84
STATUS**
OFF SCHEDULE 3-1/2 MONTHS.
DUE TO AGENCY DECISION TO
DROP CONCEPT OF "NATIONAL
REMOVAL CREDITS." OW HAS
SUBMITTED A CHANGE REQUEST.
NO FIRST QUARTER MILESTONES
FOR TRACKING PROGRESS.
PUBLISHED 11/08/83.
OFF SCHEDULE 1-1/2 MONTHS.
NEED TO REVISE PREAMBLE.
OW HAS SUBMITTED A CHANGE
REQUEST.
ON SCHEDULE. PROPOSED
11/16/83.
OFF SCHEDULE 1 MONTH.
OW HAS SUBMITTED A CHANGE
REQUEST.
ON SCHEDULE.
NO FIRST QUARTER MILESTONES
FOR TRACKING PROGRESS.
ON SCHEDULE.
OFF SCHEDULE? 1 MONTH.
* ACTUAL COMPLETION DATES.
** BASED ON INTERIM MILESTONES.
-56-
-------
DEVELOPING AND REVIEWING CRITICAL GUIDANCE AND POLICY DOCUMENTS
AS OF DECEMBER 31, 1983
POLICY OR GUIDANCE DOCUMENT
NATIONAL MUNICIPAL POLICY
WATER QUALITY MONITORING
STRATEGY
DRAFT BIOMONITORING POLICY
GUIDANCE FOR MODELLING TOXIC
POLLUTANT IMPACT ON RIVERS AND
STREAMS
GUIDANCE FOR SELECTING lr 7, &
30-DAY PERMIT AVERAGING PERIODS
GUIDANCE FOR SELECTING CRITICAL
DESIGN CONDITIONS FOR FLOW, pH
AND TEMPERATURE
USE ATTAINABILITY GUIDANCE
FINAL
DUE DATE
10/01/83
5/84
12/15/83
9/30/84
9/30/84
1/85
9/30/83
STATUS*
OFF SCHEDULE 3 MONTHS.
OW EXPECTS IT TO BE
READY FOR RELEASE IN
JANUARY, 1984.
NO FIRST QUARTER
MILESTONES FOR TRACKING
PROGRESS .
OFF SCHEDULE 1 MONTH.
ON SCHEDULE.
ON SCHEDULE.
NO FIRST QUARTER
MILESTONES FOR TRACKING
PROGRESS .
ISSUED 11/29/83.
*BASED ON INTERIM MILESTONES.
-------
DELEGATION TO STATES
STATE UNDERGROUND INJECTION CONTROL PROGRAMS APPROVED
o DURING FY 1984, ODW IS PROJECTING THAT:
- 20 STATES WILL RECEIVE FULL PRIMACY FOR A TOTAL OF 32 FULLY
DELEGATED STATES.
- 4 STATES WILL RECEIVE PARTIAL PROGRAM APPROVAL FOR A TOTAL
OF 5 PARTIALLY DELEGATED STATES.
O EPA WILL BE RESPONSIBLE FOR DIRECT IMPLEMENTATION OF THE FULL PROGRAM
IN TWENTY STATES AND PART OF THE PROGRAM IN FOUR STATES.
o WEST VIRGINIA AND WISCONSIN ASSUMED FULL PRIMACY AND KANSAS AND
MISSOURI RECEIVED PARTIAL PROGRAM APPROVAL DURING THE FIRST QUARTER.
FOURTEEN STATES NOW HAVE FULL PRIMACY.
o REGIONS III, VII AND VIII MET THEIR TARGETS FOR SUBMITTAL OF THE
DELAWARE, NEBRASKA AND COLORADO APPLICATIONS.
O REGION VIII MISSED ITS TARGETS FOR SUBMITTING THE APPLICATIONS FOR
NORTH AND SOUTH DAKOTA.
o HEADQUARTERS MISSED ITS REVIEW AND APPROVAL TARGETS FOR FLORIDA AND
ARKANSAS DUE TO DEFICIENCIES IN THE APPLICATIONS SUBMITTED BY THE
REGIONS.
o STATE UIC PROGRAMS APPROVED PRIOR TO FY 1984 COVERED ABOUT 55% OF THE
NATIONAL INVENTORY OF INJECTION WELLS. STATE UIC PROGRAMS APPROVED
IN THE FIRST QUARTER COVER 3% OF THE INVENTORY FOR A CURRENT TOTAL
OF 58% OF ALL INJECTION WELLS.
o STATE UIC PROGRAMS ARE SCHEDULED TO COVER ABOUT 80% OF THE INJECTION
WELLS BY THE END OF FY 1984.
-------
STATE UIC PROGRAMS APPROVED
AS OF DECEMBER 31,1983
ii
LEGEND
I Full (14)
S Class I, III, IV, V. (4)
O Class II (5)
CD No Assumed (15)
HI Fed. Prog. (20)
A Federal program is required in those States that have not
applied for primacy.
** Targeted for full primacy in FY-84
* Targeted for partial program approva
in FY-84
-------
OFFICE 0F SOLID WASTE AND EMERGENCY RESPONSE
TABLE OF CONTENTS
GOAL
-61-
ENFORCEMENT ............................................ 62
MEETING PROGRAM COMMITMENTS ............................ 68
DELEGATION TO STATES ................................... 74
-------
ENFORCEMENT
RCRA ENFORCEMENT ACTIVITY
O THERE ARE A TOTAL OF %v896 MAJOR HANDLERS: 2T3 ARE IN UNAUTHORIZED
STATES AND 2,623 ARE IN AUTHORIZED STATES.
o DURING FIRST QUARTER, EPA CONDUCTED A TOTAL OF 144 INSPECTIONS, 80
OF WHICH WERE FOR OVERSIGHT. THIS WAS 67 SHORT OF THE FIRST QUARTER
TARGET OF 211.
o EPA COMPLETED RECORD REVIEWS FOR 102 MAJOR HANDLERS IN UNAUTHORIZED
STATES.
o STATE ENFORCEMENT AND COMPLIANCE DATA FOR FIRST QUARTER WILL NOT BE
REPORTED UNTIL SECOND QUARTER. AS OF JANUARY 1984, DATA FROM
COOPERATIVE AGREEMENT STATES ARE NOT REPORTED TO EPA UNTIL 20 TO
30 DAYS AFTER THE END OF EACH MONTH. PER FY 1984 RCRA OPERATING
GUIDANCE, FIRST QUARTER DATA FOR AUTHORIZED STATES IS NOT DUE UNTIL
THE END OF JANUARY.
-------
RCRA ENFORCEMENT ACTTVTTY
INSPECTION OF MAJOR HANDLERS
As Of December 31, 1983
BY EPA
£ W0°"
3 750-
B
™ 800-
te
^«
Z »o- jj,-"*
g ^^
|
X*
X
X
•
i i 4
BY COOPERATIVE AGREEMENT STATES
g 1000-j
5 78°" DATA NOT AVAILABLE
9 UNT1. MARCH 1,1984
* 800-
_«
nT
QUARTER BY AUTHORIZED STATES <**W**
1
M WOO-
P W°" DATA NOT AVAILABLE
9 UNTL MARCH 1,1984
, 800-
b
3 m
*v ^9O*
«B« *****
a
^
SI "1*4*'
5 QUARTER
-------
ENFORCEMENT
SUPERFUND ENFORCEMENT ACTIVITY
1''
o SEARCHES FOR RESPONSIBLE PARTIES AT 27 NEW SITES WERE COMPLETED
DURING FIRST QUARTER. THE TARGET WAS 28.
O EPA INITIATED ONE REMEDIAL INVESTIGATION/FEASIBILITY STUDY AT AN
ENFORCEMENT SITE. THE FIRST QUARTER TARGET WAS 12.
o TWO COST RECOVERY CASES WERE REFERRED TO HEADQUARTERS BY THE REGIONS.
THE FIRST QUARTER TARGET WAS 5.
o EPA HAS BEGUN TO CLASSIFY NPL SITES AS ENFORCEMENT LEAD OR SUPERFUND
LEAD. TO DATE 42 SITES HAVE BEEN CLASSIFIED: 3 WILL BE FUND FINANCED;
13 WILL BE ENFORCEMENT LEAD; 9 WILL BE FUND FINANCED IF NEGOTIATIONS
ARE UNSUCCESSFUL; AND 17 WILL BE STATE ENFORCEMENT LEAD.
-64-
-------
SUPERFUND ENFORCEMENT ACTIVITY FDR FY 84
As Of December 31,1983
RESPONSIBLE PARTY SEARCHES
100-
90-
ENPORCEMENT MANAGED
20-
IMITATED
«
\ 2 T
QUARTER
COST REt»VERY CASES REFERRED TO
20-|
TO-
I I I
QUARTER
•IMfll
-65-
-------
ENFORCEMENT
SUPERFUND ENFORCEMENT ACTIVITY
o CURRENTLY, NEGOTIATIONS ARE UNDERWAY'WITH RESPONSIBLE PARTIES AT 37
SITES. NEGOTIATIONS WERE CONCLUDED AT 7 SITES DURING FIRST QUARTER.
NEGOTIATIONS WERE UNDERWAY WITH RESPONSIBLE PARTIES AT 68 SITES
DURING THE FIRST QUARTER OF FY 1983.
o DURING FIRST QUARTER, EPA OBTAINED RESPONSIBLE PARTY CLEANUPS TOTALLING
$53.7 MILLION AT 10 SITES. THE CLEANUPS COVERED REMEDIAL ACTIONS
AT 8 SITES AND REMOVAL ACTIONS AT 2 SITES. DURING FIRST QUARTER
FY 1983, EPA OBTAINED RESPONSIBLE PARTY CLEANUPS TOTALLING $35.5
MILLION AT 3 SITES.
o FIVE UNILATERAL ADMINISTRATIVE ORDERS WERE ISSUED: 2 FOR REMEDIAL
ACTIONS AND 3 FOR REMOVAL ACTIONS. DURING FIRST QUARTER FY 1983,
EPA ISSUED 113 ADMINISTRATIVE ORDERS. ONE HUNDRED TWELVE OF THE
ORDERS WERE ISSUED ON CONSENT.
o THERE WERE NO COST RECOVERY ACTIONS DURING FIRST QUARTER. DURING
FIRST QUARTER FY 1983, EPA NEGOTIATED 1 COST RECOVERY ACTION WORTH
$14 MILLION.
-------
200-
eo-
90-
to o-
1
SUPERFUND ENFORCEMENT ACTIVITY FOR FY 84
As Of December 31, 1983
iH
XvvvvV IxNXVNM i
r* * r
-67-
-------
MEETING PROGRAM COMMITMENTS
RCRA PERMITTING
O DURING FIRST QUARTER, EPA AND THE STATES* MADE A TOTAL OF 128 FINAL
DETERMINATIONS: 34 PERMITS ISSUED; 34 PERMITS DENIED; AND 60 PERMIT
APPLICATIONS WITHDRAWN.
- MOST OF THE ACTIVITY FOCUSED ON STORAGE AND TREATMENT
FACILITIES. THERE WERE 33 PERMITS ISSUED, 34 PERMITS
DENIED AND 45 PERMIT APPLICATIONS WITHDRAWN. (AVERAGE
PERMIT PROCESSING TIME: 1.9 CALENDAR YEARS.)
- NINE INCINERATOR APPLICATIONS WERE WITHDRAWN.
- ONE LAND DISPOSAL PERMIT WAS ISSUED (REGION VI);
7 LAND DISPOSAL APPLICATIONS WERE WITHDRAWN AND 1
WAS DENIED.
O EPA AND THE STATES ALSO PREPARED 40 DRAFT PERMITS: 38 FOR STORAGE
AND TREATMENT FACILITIES AND 2 FOR INCINERATORS.
o SINCE THE INCEPTION OF THE RCRA PROGRAM IN FY 1982, 115 PERMITS HAVE
BEEN ISSUED.
*STATE DATA IS INCOMPLETE. PER FY 1984 RCRA OPERATING GUIDANCE, STATE
DATA IS NOT DUE TO EPA UNTIL THE END OF JANUARY 1984.
-68-
-------
RCRA PERMITS - FINAL DETERMINATIONS
As of December 31,1983
Kl
I II III IV V VI VII
REGIONS
Ug«nd
I ACTUAL
-69-
-------
MEETING PROGRAM COMMITMENTS
SUPERFUND REMOVAL PROGRAM
o 24 IMMEDIATE REMOVAL ACTIONS TO STABILIZE CONDITIONS AT UNCONTROLLED
SITES WERE INITIATED DURING FIRST QUARTER. NINE OF THESE WERE IN
REGION III. DURING FIRST QUARTER FY 1983, 1 PLANNED REMOVAL ACTIVITY
AND 10 IMMEDIATE REMOVAL ACTIONS WERE INITIATED.
O TWENTY-ONE IMMEDIATE REMOVAL ACTIONS WERE COMPLETED, WITH 5 IN
REGION III AND 4 EACH IN REGIONS I AND IV RESPECTIVELY.
- DURING FIRST QUARTER FY 1983, 2 PLANNED REMOVAL ACTIVITIES
AND 10 IMMEDIATE REMOVAL ACTIVITIES WERE COMPLETED.
- A TOTAL OP 186 REMOVAL ACTIONS HAVE BEEN COMPLETED SINCE THE
INCEPTION OF THE PROGRAM.
o $5.2 MILLION WAS OBLIGATED FOR REMOVAL ACTIONS DURING FIRST QUARTER.
$1.1 MILLION WAS OBLIGATED IN THE FIRST QUARTER OF FY 1983.
o OTHER ON-SCENE RESPONSE ACTIVITY:
- 20 CWA-FUNDED OIL SPILLS WERE CLEANED UP BY EPA.
- 105 NON-CERCLA FUNDED REMOVAL ACTIVITIES WERE PERFORMED UNDER
EPA OVERSIGHT.
109 NON-CWA FUNDED OIL SPILLS WERE CLEANED UP UNDER EPA OVERSIGHT.
-------
SUPERFUND REMOVAL ACTIVITIES
As Of December 31,1983
00-
COMPLETED
00-1
no
BO-
I J ^ 4
QUARTER
\ I 1
QUARTER
•ffiMVAL*
-------
PROGRAM
ACTTVITIES
o ONE HUNDRED TWENTY-TWO SITE INSPECTIONS WERE COMPLETED, Jtfl OF
WHICH WERE IN REGION V. THE END-OF-Y"EAR TARGET CALLS FOR 1300 TO
BE COMPLETED.
o DATA RECORDED IN THE FINANCIAL MANAGEMENT SYSTEM (FMS) INDICATES
THAT A TOTAL OF $18.3 MILLION WAS OBLIGATED FOR REMEDIAL ACTIVITIES
AT A COMBINATION OF 25 NEW AND OLD SITES. THE FY 1984 OBLIGATION
TARGET IS $116.5 MILLION. ANOTHER $16.2 MILLION HAS BEEN APPROVED
FOR OBLIGATION BY THE PROCUREMENT OFEICE AND WILL BE REPORTED IN FMS
DURING SECOND QUARTER.
o THE FOLLOWING ACTIONS WERE INITIATED AT NEW SITES;
k;
- > REMEDIAL INVESTIGATION/FEASIBILITY STUDY (RI/FS). THE FIRST
QUARTER TARGET CALLED FOR 12. DURING FIRST QUARTER FY 1983,
4 RI/FS WERE INITIATED.
- 1 ENGINEERING DESIGN. MET FIRST QUARTER TARGET. DURING FIRST
QUARTER FY 1983, 1 ENGINEERING DESIGN WAS INITIATED,
- 1 INITIAL REMEDIAL MEASURE (IRM). THE FIRST QUARTER TARGET
CALLED FOR 2.
/
- A REMEDIAL ACTIONS. MET FIRST QUARTER TARGET. DURING FIRST
QUARTER FY 1983, 2 REMEDIAL ACTIONS WERE INITIATED.
O THERE WERE 141 SITES WITH ACTIVE PROJECTS AT THE END OF FIRST QUARTER,
INCLUDING 128 RI/FS, 17 ENGINEERING DESIGNS, 29 IRM'S, AND 11 REMEDIAL
ACTIONS. '"
o REMEDIAL ACTION AT THE GRATIOT COUNTY LANDFILL IN MICHIGAN WAS COMPLETED,
THIS BRINGS THE TOTAL TO 6 SITES ON THE NATIONAL PRIORITIES LIST
THAT HAVE BEEN CLEANED UP SINCE THE INCEPTION OF THE PROGRAM.
-------
hT 84 SUftRFUND
SITE REMEDIAL ACTIVITIES INITIATtD
As Of
Rtmtdk* tovttHgotl <**/
r<*»?W!?ty Shfdto
too
NaOF
s
T
AntMMI
M
T
QUAWWS
rr-r
QUARTERS
-73-
-------
DELEGATION TO STATES tAJfc?
RCRA-C FINAL STATE AUTHORIZATIONS
o DELAWARE BECAME THE FIRST STATE TO RECEIVE FINAL
ON DECEMBER 14, 1983. ^ Q
o A TOTAL OF TEN STATES ARE PROJECTED TO OBTAIN FIN
THE END OF FY 1984. IN ADDITION TO DELAWARE, THE
MISSISSIPPI, NORTH CAROLINA, COLORADO, MONTANA, N ,
DAKOTA, UTAH AND NEVADA. THE STATUTORY DEADLINE FOR FINAL AUTHORIZA-
TION OF STATE PROGRAMS IS JANUARY 26, 1985.
o TWENTY-ONE STATES HAVE SUBMITTED DRAFT APPLICATIONS. THE MAJORITY
OF STATES ARE IN REGIONS IV, VI AND VIII.
o THREE STATES DO NOT INTEND TO ADOPT THE RCRA PROGRAM: VIRGIN
ISLANDS, WYOMING AND HAWAII.
-74-
-------
DELEGATION STATUS OF RCRA - FINAL AUTHORIZATION
As Of December 31,1983
IH IV V VI VII Vllt IX X
Legend
O NONE—— 32
USA DRIFT STflQE—2i
fen fWTHORtZEO—i
AUTHOmZAT10NfHrT-*4
-------
OFFICE OF PESTICIDES AND TOXIC SUBSTANCES
TABLE OF CONTENTS
GOAL ' PAGE
ENFORCEMENT 78
MEETING PROGRAM COMMITMENTS 90
DEVELOPING AND IMPROVING CRITICAL REGULATIONS 104
STRENGTHENING PARTNERSHIP WITH STATES 110
-77-
-------
ENFORCEMENT
4
REGIONAL TSCA COMPLIANCE MONITORING INSPECTIONS
o MOST REGIONS MADE SLOW PROGRESS TOWARD THEIR END-OF-YEAR INSPECTION
TARGETS WITH THE EXCEPTION OF REGION I. REGION II HAS GREATLY
IMPROVED ITS PERFORMANCE AFTER IMPLEMENTING A NEW ENFORCEMENT
MANAGEMENT PLAN.
O THE REMAINING REGIONS MADE ONLY SLIGHT PROGRESS TOWARD THEIR FY 1984
TARGETS. THE POOR PERFORMANCE IN REGION IV THIS QUARTER FOLLOWS A
FY 1983 SHORTFALL.
O THE MAJORITY OF INSPECTIONS WERE IN THE AREAS OF PCBs (165 INSPECTIONS)
AND ASBESTOS (203) .
-78-
-------
REGIONAL T5CA COMPLIANCE MONITORING INSPECTIONS
As of December 31, 1983
500-i
CUMULATIVE NUMBER COMPLETED
_t M C4 &
0 0 O O
0000
1 1 1 1
HI 0
II
1 W*WA
[I
LHJ
§ 1 II III
Ul
0
\
m@
IV
F
.
Uhfu
I
LW.
V VI
REGIONS
p
VII VIII IX X ia ACTUAL
VII Vlll IA A CBWOOrVtAHWHOCT
-7Q-
-------
ENFORCEMENT
4
REGIONAL TSCA ASBESTOS COMPLIANCE MONITORING INSPECTIONS
o THE TARGET FOR FY 1984 INCLUDES 114 FEDERAL AND 700 AARP CONTRACT
INSPECTIONS.
o THE REGIONS MADE UNEVEN PROGRESS AGAINST THEIR FEDERAL INSPECTION
TARGETS. SEVENTY-EIGHT OF 114 FEDERAL INSPECTIONS TARGETED FOR
FY 1984 WERE COMPLETED IN THE FIRST QUARTER. REGION VI EXCEEDED
THE FY 1984 TARGET IN THE FIRST QUARTER.
O MOST REGIONS MADE ONLY SLIGHT PROGRESS IN COMPLETING AARP INSPECTIONS,
THE SHORTFALL WAS DUE TO THE FACT THAT THE GRANT WITH THE AARP
PROVIDING FOR 700 INSPECTIONS IN FY 1984 WAS NOT APPROVED UNTIL AFTER
THE QUARTER ENDED.
o REGIONS I AND II HAD COMMENDABLE FIRST QUARTER PERFORMANCES. BOTH
EXCEEDED THEIR FY 1984 INSPECTION TARGETS WHILE ISSUING A TOTAL OF
69 NOTICES OF NONCOMPLIANCE.
-80-
-------
REGIONAL TSCA COMPLIANCE MONfTORING INSPECTIONS
ASBESTOS IN SCHOOLS RULE
As of December 31,1983
8
2001
150-
100-
i ii in iv
V VI
REGIONS
Legend
SIGNIF1CAHT
VIOLATORS 31
28 6 1 12 3 9 6 3 1
•i ACTUAL
E3 END Of YEAR TARGET
-81-
-------
ENFORCEMENT
REDUCING TSCA SIGNIFICANT VIOLATORS
o REGIONAL TARGETS HAVE NOT BEEN APPROVED BY OPTS AND ARE NOT YET
CONSIDERED VALID. OPTS IS WORKING WITH THE REGIONS TO DEVELOP
ACCEPTABLE TARGETS.
o THE REGIONS REDUCED THE INVENTORY OF SIGNIFICANT VIOLATORS BY 51
IN THE FIRST QUARTER.
O FEDERAL FACILITIES COMPLIANCE ACTIVITIES TARGETED IN REGIONS I
AND III WERE COMPLETED.
O ONE HUNDRED FORTY-THREE SIGNIFICANT VIOLATIONS WERE ADDED TO THE
FY 1984 INVENTORY IN THE FIRST QUARTER.
-82-
-------
REDUCING NUMBER OF TSCA
SIGNIFICANT VIOLATERS
(TARGETS NOT APPROVED BY OPTS)
EOY
2
QUARTERS
Legend
E2 RETURNED TO COMPLIANCE
M PENDING
-------
ENFORCEMENT
FIFRA COMPLIANCE MONITORING.FEDERAL INSPECTIONS
o THE REGIONS PERFORMED POORLY IN THE FIRST QUARTER, COMPLETING ONLY
92 INSPECTIONS OVERALL. THIS PERFORMANCE REPRESENTS 7% OF THE
AGENCY'S TARGET OF 1,337 IN FY 1984.
o THE MAJORITY OF FEDERAL FIFRA INSPECTIONS WILL BE PERFORMED IN
LATER QUARTERS DUE TO THE SEASONALITY OF PESTICIDE USE.
o STATE PESTICIDES INSPECTIONS WILL BE REPORTED IN THE SECOND QUARTER.
-85-
-------
ENFORCEMENT
REDUCING FIFRA SIGNIFICANT VIOLATORS
o REGIONAL TARGETS HAVE NOT BEEN APPROVED BY OPTS. OPTS IS WORKING
WITH THE REGIONS TO DEVELOP ACCEPTABLE TARGETS.
o THE REGIONS REDUCED THE INVENTORY OF SIGNIFICANT VIOLATORS BY 36
IN THE FIRST QUARTER.
O FORTY-FOUR SIGNIFICANT VIOLATIONS WERE ADDED TO THE FY 1984
INVENTORY IN THE FIRST QUARTER.
-------
100-1
u
IO
JO
REDUCING NUMBER OF FIFRA
SIGNIFICANT VIOLATORS
(TARGETS NOT APPROVED BY OPTS)
COY
1 2
QUARTERS
Legend
IZ2 RETURNED TO COMPLIANCE
Hi PENDING
-------
ENFORCEMENT
4
EVALUATION REPORT OF STATE TSCA PILOT GRANT PROGRAMS
o OPTS MET THE TARGET FOR COMPLETING ON-SITE EVALUATIONS OF STATE
TSCA PILOT GRANT PROGRAMS.
o EVALUATIONS WERE CONDUCTED IN ALL FIVE PILOT GRANT STATES
(CA, MI, OH, CT AND MD). THESE EVALUATIONS WILL BE USED IN
PREPARING A FINAL REPORT.
ENFORCEMENT STRATEGIES FOR TSCA RULES
o OPTS MET THE 60-DAY TARGETS FOR ISSUANCE OF (1) A DRAFT ENFORCEMENT
STRATEGY FOR A TSCA SECTION 8(c) RECORDKEEPING RULE; AND (2) A
FINAL STRATEGY/ENFORCEMENT RESPONSE POLICY FOR A TSCA SECTION 8(d)
HEALTH AND SAFETY STUDIES RULE.
o DRAFT STRATEGIES ARE DUE IN THE SECOND QUARTER FOR A TSCA RULE ON
GOOD LABORATORY PRACTICES AND A SECTION 13 IMPORTS RULE.
-88-
-------
ENFORCEMENT
TSCA AND FIFRA LABORATORY AUDITS
TSCA
o OPTS CONDUCTED 15 TSCA LABORATORY AUDITS IN THE FIRST QUARTER,
o THIS PERFORMANCE REPRESENTS 12% OF THE FY 1984 TARGET OF 130
LABORATORY AUDITS. PERFORMANCE WAS AFFECTED BY CHANGES IN THE
MANAGEMENT OF THIS PROGRAM AND IS EXPECTED TO IMPROVE IN THE
NEXT QUARTER.
FIFRA
O OPTS CONDUCTED 15 FIFRA LABORATORY AUDITS IN THE FIRST QUARTER,
o THIS PERFORMANCE REPRESENTS 25% OF THE FY 1984 TARGET OF 60
LABORATORY AUDITS.
-------
MEETING PROGRAM COMMITMENTS
PESTICIDE REGISTRATION STANDARDS
»
O OPP ESTABLISHED 5 REGISTRATION STANDARDS IN THE FIRST QUARTER, NEARLY
MEETING THE TARGET.
o THE STANDARDS ISSUED IN THE FIRST QUARTER COVERED REREGISTRATION
REQUIREMENTS FOR A TOTAL OF 519 PESTICIDE PRODUCTS.
o AS OF THE END OF THE FIRST QUARTER, REGISTRATION STANDARDS HAD BEEN
ISSUED ON A TOTAL OF 70 PESTICIDE ACTIVE INGREDIENTS, LEAVING 484
CHEMICALS YET TO BE REVIEWED.
-90-
-------
PESTICIDE REGISTRATION STANDARDS
CUMULATIVE NUMBER OF STANDARDS ESTABLISHED
As of December 31,1983
20-
8
e
00
1
I
10-
2 3
QUARTERS
Legend
Hi ACTUAL
en TARGET
-------
MEETING PROGRAM COMMITMENTS
PESTICIDE REGISTRATION STANDARDS FOLLOW-UP
o OPP COMPLETED THE FIRST SEMI-ANNUAL REGISTRATION STANDARDS EVALUATION
MEASURES REPORT IN THE FIRST QUARTER IN ACCORDANCE WITH A SPMS
COMMITMENT TO REPORT ON PROGRESS IN COLLECTING DATA REQUESTED IN
REGISTRATION STANDARDS. THE REPORT'S FINDINGS ARE SUMMARIZED ON
THE OPPOSITE PAGE.
O THE REPORT INDICATES THAT A SUBSTANTIAL PERCENTAGE OF TOTAL U. S.
PESTICIDE USAGE HAS BEEN COVERED BY REGISTRATION STANDARDS THAT
HAVE BEEN ISSUED. HOWEVER OVER THREE QUARTERS OF THE PRODUCTS
AFFECTED BY REGISTRATION STANDARDS ARE STILL PENDING REREGISTRATION.
O OPP INTENDS TO FOCUS SIGNIFICANT MANAGEMENT ATTENTION IN THE AREA
OF FOLLOW-UP IN THE NEXT SIX MONTHS.
-92-
-------
STATUS OF PESTICIDE REGISTRATION STANDARDS
FOLLOW-UP ACTIVITIES
AS OF SEPTEMBER 30, 1983
ACTIVITY
REGISTERED ACTIVE INGREDIENTS COVERED BY CURRENT
REGISTRATION STANDARDS.
TOTAL U.S. PESTICIDE USAGE COVERED BY CURRENT
REGISTRATION STANDARDS.
PRODUCTS REREGISTERED UNDER REGISTRATION STANDARDS
ISSUED TO DATE.
PRODUCTS CANCELLED OR SUSPENDED UNDER REGISTRATION
STANDARDS ISSUED TO DATE.
PRODUCTS PENDING REREGISTRATION UNDER REGISTRATION
STANDARDS ISSUED TO DATE.
ACTIVE INGREDIENTS FOR WHICH HEALTH AND SAFETY
RESTRICTIONS HAVE BEEN IMPOSED.
ACTIVE INGREDIENTS FOR WHICH DATA WERE INADEQUATE
FOR RISK ASSESSMENT.
ACTIVE INGREDIENTS REQUIRING TOLERANCES AND HAVING
INADEQUATE DATA BASES.
ACTIVE INGREDIENTS REQUIRING CHRONIC STUDIES.
PERCENT
COMPLETED
11%
35%
3%
20%
77%
51%
70%
86%
80%
-------
MEETING PROGRAM COMMITMENTS
PESTICIDE DATA CALL-IN LETTERS
*
o DATA CALL-IN LETTERS WERE ISSUED FOR 18 PESTICIDES WITH INCOMPLETE
CHRONIC DATA BASES, EXCEEDING THE FIRST QUARTER TARGET OF 17.
o THE DATA GENERATED UNDER THIS PROGRAM WILL BE USED IN SUPPORT OF
FUTURE REGISTRATION STANDARDS.
O AS OF THE END OF THE FIRST QUARTER, DATA CALL-IN LETTERS HAD BEEN
ISSUED FOR A TOTAL OF 185 PESTICIDES, WITH 317 PESTICIDES STILL TO
RECEIVE LETTERS.
_a A _
-------
PESTICIDE DATA CALL-IN LETTERS
CUMULATIVE NUMBER OF FY-84 LETTERS ISSUED
As of December 31,1983
m
z
73
60-
45-
30-
8 J
HI
QUARTERS
Legend
EH ACTUAL
en TARGET
-95-
-------
MEETING PROGRAM COMMITMENTS
PESTICIDE SPECIAL REVIEWS
o TWO SPECIAL REVIEWS WERE COMPLETED IN THE FIRST QUARTER, MEETING
THE TARGET.
O THE RESULTS OF THE TWO SPECIAL REVIEWS WERE AS FOLLOWS:
- A RISK/BENEFIT ANALYSIS WAS PERFORMED FOR A NEW CHEMICAL
REGISTRATION (ETHYLFLURALIN); AND
A PROPOSED INTENT TO CANCEL THE REMAINING USE OF A
PREVIOUS SPECIAL REVIEW PESTICIDE (DBCP) WAS ANNOUNCED.
_Q A_
-------
PESTICIDE SPECIAL REVIEW DECISIONS
CUMULATIVE NUMBER OF PROPOSALS / DECISIONS COMPLETED
As of December 31,1983
12-
8
CD
Z
ID
I s
K>
Legend
QUARTERS
ACTUAL
CO TARGET
-------
MEETING PROGRAM COMMITMENTS
PESTICIDE REGISTRATION^ APPLICATIONS
CURRENT APPLICATIONS
o OPTS EXCEEDED THE FIRST QUARTER TARGETS FOR ALL CATEGORIES OF
REGISTRATION APPLICATIONS.
o TARGETS WERE FAR EXCEEDED IN THE MORE SIGNIFICANT AND RESOURCE
INTENSIVE AREAS OF NEW CHEMICAL/NEW BIORATIONAL REVIEWS AND NEW
USE REVIEWS.
BACKLOG
o BACKLOG REDUCTION WAS OUT OF BALANCE WITH PROCESSING OF CURRENT
APPLICATIONS IN THE FIRST QUARTER. THE BACKLOG OF UNPROCESSED
PETITIONS INCREASED BY 47% IN THE FIRST QUARTER.
O THE INCREASE WAS MAINLY IN THE AREA OF NEW USE REVIEWS WHICH HAD A
BACKLOG OF 40 APPLICATIONS AT THE END OF THE QUARTER.
-98-
-------
PESTICIDE REGISTRATION APPLICATIONS
NUMBER OF FIRST QUARTER FY 84 APPLICATIONS PROCESSED
As of December 31,1983
SEE OF BACKLOG
100-1
75-
50-
m
z
23-
2000-1
1300-
1000-
300-
240-
1 2 3
QUARTERS
NO. OF PENDING
APPLICATIONS WHOSE TIME
LIMIT HAS BEEN EXCEEDED
Legend
Hi ACTUAL
E3 TARGET
-QQ-
-------
MEETING PROGRAM COMMITMENTS
PESTICIDE FFDCA TOLERANCE PETITIONS
CURRENT PETITIONS
o OPP ACHIEVED ONLY 74% OF THE FIRST QUARTER TARGET.
t
o THIS REPRESENTS THE THIRD CONSECUTIVE QUARTER IN WHICH PERFORMANCE
AGAINST THE TARGET HAS DECLINED.
O OPP ATTRIBUTES THE DECLINE IN PERFORMANCE TO A CONTINUING SHORTAGE
OF SCIENTIFIC REVIEWERS.
BACKLOG
6 NO PROGRESS WAS MADE IN REDUCING THE BACKLOG OF UNPROCESSED PETITIONS,
ALTHOUGH OPTS LENGTHENED THE FY 1984 PROCESSING SCHEDULE FOR INDIVIDUAL
PETITIONS TO 240 DAYS FROM 180 DAYS.
-100-
-------
PESTICIDE TOLERANCE PETITIONS
NUMBER OF PETITIONS PROCESSED
As of December 31,1983
SEE OF BACKLOG
150-1
I
2 3
QUARTERS
n-
60-
45
30-
•
1
NO. OF PENDING
PETmONS WHOSE TIME
LIMIT HAS BEEN EXCEEDED
Legend
HI ACTUAL
823 TARGET
-101-
-------
MEETING PROGRAM COMMITMENTS
TSCA NEW CHEMICAL REVIEWS
o OPTS REVIEWED A TOTAL OF 399 NEW CHEMICAL NOTICES IN THE FIRST
QUARTER:
- 379 PREMANUFACTURE NOTICES, 75% OF WHICH REQUIRED NO FURTHER
ACTION AND 8% OF WHICH WERE REFERRED FOR FOLLOW-UP; AND
- 20 TEST MARKET EXEMPTIONS, 75% OF WHICH WERE APPROVED AND
25% OF WHICH WERE SUSPENDED.
-102-
-------
MEETING PROGRAM CpMMITMENTS
SUMMARY OF REGULATORY ACTIONS ON FORMALDEHYDE
ITEM
SCIENTIFIC CONSENSUS
WORKSHOP
STATUS
ON SCHEDULE. SUBPANELS ARE REVIEWING
REPORTS ON SCIENTIFIC DATA AND WILL
SUBMIT REPORTS TO EXECUTIVE PANEL IN
JANUARY 1984.
FORMALDEHYDE 4(f)
RESCISION
FORMALDEHYDE CANCER
CASE-CONTROL STUDY
ON SCHEDULE. DECISION TO RESCIND TSCA
SECTION 4(f) NOTICE (NOT TO EVALUATE
FORMALDEHYDE) ISSUED IN NOVEMBER 1983.
COMMENT PERIOD CLOSES IN JANUARY 1984.
OMB APPROVAL OBTAINED 9/2/83 AFTER SIX
MONTH DELAY. STUDY IS CURRENTLY IN
DATA COLLECTION PHASE.
-------
DEVELOPING AND IMPROVING CRITICAL REGULATIONS
4
TSCA EXISTING CHEMICAL REVIEWS
REVIEWS INITIATED
o OPTS MET THE FIRST QUARTER TARGET - REVIEWS WERE INITIATED ON 12
EXISTING CHEMICALS.
REVIEWS COMPLETED
o OPTS MET THE FIRST QUARTER TARGET - REVIEWS WERE COMPLETED ON 5
EXISTING CHEMICALS.
- THREE RULES WERE PROPOSED FOR THE REGULATION OF PCBs;
- A CHEMICAL ADVISORY WAS ISSUED FOR USED MOTOR OIL; AND
- A SECTION 4(f) DESIGNATION WAS MADE FOR 1,3 BUTADIENE.
-104-
-------
TSCA EXISTING CHEMICAL REVIEWS
As of December 31, 1983
^
INITIATED COMPLETED
SO-
!«•-
s
3
CUMUUTIVE NUMBER INf
, 3 8 g
(ill
%
Mi
50-]
%
%
%
*
40-
30-
20-
10-
™ i
% H
m:\ .. .
§. 1234 113
g QUARTERS QUARTERS
I
///
> .
5 Legend
ii
I ACTUAL
EZJ TARGET
-------
DEVELOPING AND IMPROVING CRITICAL REGULATIONS
TSCA TEST STUDY RESULTS
o OPTS MET THE TARGET FOR RECEIPT OF TEST STUDY RESULTS.
o TWENTY TEST STUDIES WERE RECEIVED ON 5 CHEMICALS IN THE FIRST QUARTER,
TSCA SECTION 4 TEST DATA AUDITS
O OPTS CONDUCTED 16 STUDY AUDITS IN 6 LABORATORIES DURING THE FIRST
QUARTER AGAINST A QUARTERLY TARGET OF 43.
o THE LOW NUMBER IS DUE TO THE LACK OF FDA INSPECTORS WHO ARE LEGALLY
REQUIRED TO ACCOMPANY EPA ON THESE AUDITS.
o OPTS IS REVIEWING THE SITUATION AND EXPECTS TO DECIDE IN THE SECOND
QUARTER WHETHER THIS ISSUE WILL PROVE TO BE A PROBLEM IN MEETING OUR
ANNUAL COMMITMENT DURING THE REMAINDER OF FY 1984.
-106-
-------
TSCA TEST STUDY RESULTS
NUMBER OF RESULTS RECEIVED
As of December 31, 1983
m
200
175
150
125
100
50
25
0
1
QUARTER
L«g«nd
Hi NUMKK RtCOVCO
CD NUMKM DUE
-------
DEVELOPING AND IMPROVING CRITICAL REGULATIONS
«
INTERAGENCY TESTING COMMITTEE (ITC) DESIGNATIONS — NEW LIST
o OPTS ACHIEVED THE FIRST QUARTER TARGET.
o ELEVEN FINAL DECISIONS WERE MADE:
- FOUR NEGOTIATED TESTING AGREEMENTS WERE INITIATED; AND
- SEVEN CHEMICALS WILL NOT REQUIRE TESTING.
INTERAGENCY TESTING COMMITTEE (ITC) DESIGNATIONS — PAST LIST
o OPTS ACHIEVED THE FIRST QUARTER TARGET.
O THIRTEEN FINAL DECISIONS WERE MADE:
- ONE NEGOTIATED TESTING AGREEMENT WAS INITIATED;
TEN TEST RULES WERE INITIATED; AND
- TWO CHEMICALS WILL NOT REQUIRE TESTING.
o ALL ITC BACKLOG LISTS HAVE NOW BEEN REVIEWED IN ACCORDANCE WITH
THE COURT ORDER.
-109-
-------
STRENGTHENING PARTNERSHIP WITH STATES
EMERGENCY EXEMPTIONS FOR PESTICIDES
«
CURRENT APPLICATIONS
o OPP PERFORMED WELL IN THE FIRST QUARTER, ACHIEVING 87% OF THE QUARTERLY
TARGET. AT THE SAME TIME SPECIAL EMPHASIS WAS PLACED ON THE QUALITY
OF REVIEWS.
o REVIEWS WERE SLIGHTLY BELOW TARGET LEVELS BECAUSE SOME APPLICATIONS
WERE RECEIVED TOO LATE TO BE COMPLETED.
o OF 96 ACTIONS COMPLETED IN THE FIRST QUARTER, 75 RESULTED IN APPROVALS
FOR EMERGENCY EXEMPTION USE OF PESTICIDES, 28 OF WHICH WERE STATE
CRISIS EXEMPTIONS.
BACKLOG
o THE TOTAL BACKLOG OF APPLICATIONS NOT PROCESSED WITHIN THE ADMINISTRATIVE
TIME SCHEDULE WAS 4.
O BACKLOGGED APPLICATIONS WILL BE REVIEWED AS A PART OF THE SECOND
QUARTER TARGET.
-110-
-------
NUMBER OF EMERGENCY EXEMPTIONS APPLICATIONS COMPLETED
As of December 31,1983
SIZE OF BACKUOG
300-1
2 3
QUARTERS
to-
5-
1234
QUARTERS
NO. OF PENDING
APPLICATIONS WHOSE TIME
UMIT HAS BEEN EXCEEDED
Legend
ACTUAL
TARGET
-------
OFFICE OF ENFORCEMENT AND COMPLIANCE MONITORING
TABLE OP CONTENTS
GOAL PAGE
ENFORCEMENT 114
-113-
-------
ENFORCEMENT
4
PROCESSING OF LITIGATION ACTIONS
o THE REGIONS REFERRED 17 NEW CIVIL ACTIONS TO HEADQUARTERS, ONE NEW
CIVIL ACTION DIRECTLY TO DEPARTMENT OF JUSTICE, AND 8 NEW CRIMINAL
ACTIONS TO HEADQUARTERS. THIS LEVEL OF LITIGATION REFERRAL ACTIVITY
IS ABOUT EQUAL TO THE NUMBER OF NEW REFERRALS IN THE FIRST QUARTER
FY 1983.
o EPA HEADQUARTERS REFERRED 45 CIVIL ACTIONS AND 4 CRIMINAL ACTIONS
TO THE DEPARTMENT OF JUSTICE. THIS EQUALS APPROXIMATELY THE NUMBER
OF REFERRALS TO DEPARTMENT OF JUSTICE IN THE FIRST QUARTER FY 1983.
o THIRTEEN CIVIL ACTIONS WERE RETURNED TO THE REGIONS FOR FURTHER
WORK DURING THE FIRST QUARTER. THIS IS A RATE THAT IS HIGHER THAN
NORMAL.
-114-
-------
LITIGATION ACTONS PROCESSED BY HQ
First Quarter October 1,1983 To December 31,1983
M
70
•0
80
40
90
to
LEGEND
QCMI ACTONS
QCMMNMLACnoWl
i
i
i
fe
-115-
-------
ENFORCEMENT
STATUS OF CIVIL REFERRALS
o DURING THE FIRST QUARTER, THE AVERAGE PROCESSING TIME BY EPA HEADQUARTERS
FOR CIVIL REFERRALS TO DEPARTMENT OF JUSTICE WAS 77 DAYS, EXCEEDING OUR
TARGET OF 90 DAYS.
o AT THE END OF THE FIRST QUARTER, 293 CIVIL ACTIONS WERE PENDING:
- 4 PERCENT ARE UNDER REVIEW AT EPA HEADQUARTERS.
- 29 PERCENT HAVE BEEN REFERRED TO DEPARTMENT OF JUSTICE/U.S. ATTORNEYS.
- 67 PERCENT HAVE BEEN FILED IN DISTRICT COURTS.
o TWENTY-FOUR CIVIL ACTIONS WERE CLOSED DURING THE FIRST QUARTER.
- 12 BY SETTLEMENT
- 2 BY COURT JUDGMENT
- 2 BY COURT DISMISSAL
- 2 BY REGIONAL WITHDRAWAL
- 6 BY EPA HEADQUARTERS DISMISSAL OR WITHDRAWAL.
-116-
-------
ENFORCEMENT
OECM POLICY AND GUIDANCE ACTIVITIES
ITEM
STATUS
CIVIL PENALTY POLICY
CONTRACTOR LISTING POLICY
ENFORCEMENT/COMPLIANCE GUIDANCE
MANUALS AND COMPENDIA
UNIFORM STATE REPORTING
REQUIREMENT
ADP SYSTEM FOR TRACKING
COMPLIANCE WITH CONSENT DECREES
COORDINATING FEDERAL AND STATE
ENFORCEMENT
GEOGRAPHIC STRATEGY INITIATIVES
RESULTS OF THE COMPLIANCE
STRATEGY TASK FORCE
EVIDENCE AUDIT PROGRAM
FINAL PRODUCT IS OVERDUE, INITIATELY
DUE IN FY 1983; SCHEDULE HAS BEEN
REVISED AND POLICY SUBMITTED TO DA
IS EXPECTED BY 1/27/84,
PROJECT IS THREE MONTHS BEHIND
ORIGINAL SCHEDULE; GUIDANCE IS
EXPECTED TO BE ISSUED BY 3/26/84.
PROJECTS ON SCHEDULE WITH TWO
EXCEPTIONS: RCRA MANUAL IS THREE
MONTHS BEHIND SCHEDULE AND CAA
MANUAL HAS A MINOR DELAY.
WORK PLAN WITH SCHEDULE WAS PROVIDED.
PROJECT COMPLETED; GUIDANCE ISSUED
12/20/83.
WORK PLAN WITH SCHEDULE WAS PROVIDED.
DA BRIEFED 12/5/83; WORK PLAN
APPROVED. IMPLEMENTATION PLAN DUE
3/1/84.
FINAL PACKAGE DISTRIBUTED ON 12/23/84
ISSUANCE EXPECTED BY 1/30/84.
GUIDANCE ISSUED ON 12/30/83.
-117-
-------
OFFICE OF RESEARCH AND DEVELOPMENT
TABLE OF CONTENTS
GOAL PAGE
IMPROVING THE QUALITY OF EPA SCIENCE 120
-119-
-------
IMPROVING THE QUALITY OF EPA SCIENCE
CLIENT PROGRAM
ITEM
(LATE ITEMS)
STATUS
ALL PROGRAM OFFICES
ALL PROGRAM OFFICES
LONG-TERM EXPLORATORY
RESEARCH AGENDA.
QUALITY ASSURANCE PROGRAM
GUIDELINES FOR DETERMINING
AND REPORTING DATA QUALITY
ASSESSMENTS (OBJECTIVES
ONE AND TWO).
THE PROJECT IS THREE
MONTHS BEHIND SCHEDULE;
SUBMITTAL OF DRAFT
AGENDA TO SAB IS
EXPECTED BY 2/29/84.
CARRYOVER COMMITMENT
FROM FY 1983, ORD HAS
REQUESTED AN EXTENSION
OF FY 1984 MILESTONE;
GUIDELINES ARE NOW
EXPECTED BY 3/31/84.
(ITEMS ON SCHEDULE)
ALL PROGRAM OFFICES
QUALITY ASSURANCE PROGRAM
IMPLEMENTATION STRATEGY.
PROGRAM TO BRING
DISTINGUISHED VISITING
SCIENTISTS INTO ORD
LABORATORIES.
RESULTS OF THE COMPETITIVE
RESEARCH GRANTS AND
CENTERS PROGRAM.
FIRST DRAFT WAS
SUBMITTED FOR AGENCY
REVIEW ON TIME.
PROGRAM PLAN WAS
PROVIDED; ORD IS
MEETING MILESTONES
IN PLAN.
SCHEDULE FOR
DISSEMINATION OF
THE RESULTS WAS
PROVIDED.
-120-
-------
CLIENT PROGRAM
ITEM
STATUS
OSWER
OAR
OAR
OAR
OAR
OAR
OAR
OAR
PRELIMINARY REPORT FOR
SELECTING APPROPRIATE
LAND TREATMENT SITES,
EXTERNAL REVIEW DRAFT
OF THE AIR QUALITY
CRITERIA DOCUMENT FOR
LEAD.
EXTERNAL REVIEW DRAFT
OF THE HEALTH ASSESSMENT
DOCUMENT FOR TRICHLORO-
ETHYLENE.
EXTERNAL REVIEW DRAFT
OF THE HEALTH ASSESSMENT
DOCUMENT FOR TETRACHLORO-
ETHYLENE.
EXTERNAL REVIEW DRAFT
OF THE HEALTH ASSESSMENT
DOCUMENT FOR METHYLENE
CHLORIDE.
EXTERNAL REVIEW DRAFT
OF THE UPDATED CANCER
RISK ASSESSMENT ON
VINYL CHLORIDE.
EXTERNAL REVIEW DRAFT
OF THE HEALTH ASSESSMENT
DOCUMENT FOR HEXACHLORO-
CYCLOPENTADIENE.
REPORT ON THE USE OF
THE GENETIC BIOASSAYS IN
EVALUATING UNREGULATED
EMISSIONS.
REPORT WAS SUBMITTED
TO OSW ON TIME.
DRAFT WAS RELEASED
TO SAB ON TIME,
DRAFT WAS SUBMITTED
TO HEADQUARTERS ON
TIME.
DRAFT WAS SUBMITTED
TO HEADQUARTERS ON
TIME.
DRAFT WAS SUBMITTED
TO HEADQUARTERS ON
TIME.
DRAFT WAS SUBMITTED
TO HEADQUARTERS ON
TIME.
DRAFT WAS SUBMITTED
TO HEADQUARTERS ON
TIME.
REPORT SUBMITTED TO
QMS ON TIME.
-1 91 -
-------
OFFICE OF ADMINISTRATION AND RESOURCES MANAGEMENT
TABLE OF CONTENTS
GOAL PAGE
MEETING PROGRAM COMMITMENTS 125
-123-
-------
OFFICE OF ADMINISTRATION AND RESOURCES MANAGEMENT
MEETING PROGRAM COMMITMENTS
ITEM
STATUS
O STANDARDS FOR SERVICE DELIVERY
TO AGENCY CLIENTS.
DEVELOPED ON SCHEDULE.
o AGENCY CONTROL CERTIFICATIONS
REQUIRED BY FINANCIAL INTEGRITY
ACT.
FINAL CERTIFICATIONS ACCOMPLISHED
ON SCHEDULE.
O WORKPLAN FOR HEADQUARTERS MASTER
SPACE PLAN.
SUBMITTED ON SCHEDULE.
o WORKPLAN FOR CENTRAL DATA BASE
MANAGEMENT - EPA ADMIN. INFO.
SYSTEMS.
POSTPONED THREE MONTHS TO ALLOW
INCORPORATION OF KEY FINDINGS &
RECOMMENDATIONS FROM NAPA BUDGET
STUDY. WORKPLAN EXPECTED BY
3/31/84.
-------
ADP SERVICE STANDARDS
^
o DURING THE FIRST QUARTER, OARM MET THE TARGET FOR RESPONSE TIME FOR
BATCH AND INTERACTIVE DATA PROCESSING JOBS ABOUT HALF THE TIME.
O ALL ADP SYSTEM STABILITY TARGETS WERE ACHIEVED, WITH THE RESULTS
THAT SYSTEMS WERE OPERABLE 98% OF THE TIME.
-------
ADP SERVICE STANDARDS
As of December 31,1983
SERVICE TIME
STABILITY
2 3
QUARTERS
TARGET 90%
100-1
30-
2 3
QUARTERS
Legend
EZJ BATCH PROCESSING
•I INTERACTIVE PROCESSING
Legend
E2 NUMBER OF FAILURES
HI MEAN TIME BETWEEN FAILURES
-------
PERSONNEL SERVICE*STANDARDS
O OARM MET ITS SERVICE STANDARD FOR PROCESSING VIRTUALLY ALL NON-
COMPETITIVE AND MISCELLANEOUS ACTIONS AND AWARDS.
O RECRUITMENTS EXCEEDED OARM'S STANDARD FOR TOTAL PROCESSING TIME
FOR OVER TWO-THIRDS OF THE ACTIONS REQUIRING THE ASSISTANCE OF
THE OFFICE OF PERSONNEL MANAGEMENT (OPM).
O RECRUITMENTS PROCESSED WITHIN EPA MET THE STANDARD TOTAL PROCESSING
TIME FOR ABOUT HALF THE ACTIONS.
- THE PERSONNEL MANAGEMENT DIVISION (PMD) MET ALL OF ITS INTERNAL
PROCESSING TIME TARGETS. THIS REPRESENTS ONLY A PORTION OF THE
TOTAL STANDARD, WHICH INCLUDES THE TOTAL RECRUITMENT PROCESS,
START TO FINISH.
- PROBLEMS WERE MOSTLY OUTSIDE THE CONTROL OF PMD:
— DELAYS ATTRIBUTABLE TO THE PROGRAM OFFICES AND OPM
ACCOUNTED FOR ABOUT 75% OF THE LATENESS.
•128-
-------
PERCENT
100-
75-
O 50-
25-
OF ACTIONS MEETING STANDARDS FOR PERSONNEL SERVICES
As of December 31, 1983
RECRUITMENT ACTIONS . NON-COMPETITIVE ACTIONS
100 ^ _^
1
75-
0 50-
b» M^ tfh U^
* 25-
_ . . »
-
Om
• I I I ' I w I I I I
1234 1234
QUARTERS Legend QUARTERS
• INTERNAL EPA
• OCTTONAL.OQI
MISC. ADMIN. ACTIONS AWARDS ACTIONS
100*- - Inn A .. i . ^
'
75-
O 50-
K> 25-
*
, .
75-
8 50-
25-
uj ° i i i "i11 ' w~ • r i i i
| 1234 1234
3 QUARTERS QUARTERS
-------
PROCUREMENT SERVICE STANDARDS
o THREE-FOURTHS OF EPA'S MAJOR NEGOTIATED CONTRACTS WERE AWARDED WITHIN
OARM'S TARGETS FOR PROCESSING TIME:
- 87 DAYS FOR NEW SOLE SOURCE CONTRACTS.
- 170 DAYS FOR NEW COMPETITIVE CONTRACTS.
o AVERAGE LEAD TIME FOR SMALL PURCHASES WAS WELL WITHIN TARGET FOR
FIRST QUARTER. A PROBLEM IN DATA REPORTING FORMAT WILL BE CORRECTED
SECOND QUARTER.
-------
PROCUREMENT SERVICE STANDARDS
As of December 31,1983
MAJOR NEGOTIATED CONTRACTS SMALL PURCHASES
100-
75-
t—
X
U 50-
25-
wo-
~JH 75~
^H
%•
x/>^H Q
^^1 Q 50-
^^H 2S'
«
RRST
QUARTER
DATA
NOT
AVAILABLE
1 | | | W | | 1 1
1234 1234
w QUARTERS QUARTERS
*
g Legend Legend
EZI NEW COMPETITIVE 170 DAYS B22 COMPETITIVE
•1 NEW SOLE SOURCE 87 DAYS 0 SOLE SOURCE
-131-
-------
GRANTS SERVICE STANDARDS
o OARM WAS SUCCESSFUL IN PROCESSING GRANT AND COOPERATIVE AGREEMENT
ACTIONS IN HALF THE TIME REQUIRED BY THE SERVICE STANDARDS.
-------
GRANTS SERVICE STANDARDS
As of December 31,1983
AWARD GftAHTS OR
COOPERATIVE AGREEMENTS
30-i
TARGET (18)
AWARD INTERAGCNCY AGREEMENTS
30-1
2 20-
TARGET(18)
101
1234
QUARTERS
234
QUARTERS
to
SI
PREFARE DETERMINATION FOR
DEVIATION FROM REGULARITY REOAJIREMENTS
30-1
Q 20-
10-
• TARGET (15)
234
QUARTERS
50-
29-
ISSUE DCTGRUINAT10N IN
SUSPCNSION/DEBARMENT C/
CASES
•TARGET (35)
1234
QUARTERS
-133-
-------
OFFICE OF POLICY, PLANNING AND EVALUATION
MEETING PROGRAM COMMITMENTS
ITEM
STATUS
o GENERIC TRADING RULE
SCHEDULE REVISED TO REFLECT 5 MONTH
DELAY. OPPE EXPECTS SUBMISSION TO
RED BORDER 5/84.
O WATER REGULATORY REFORM STRATEGY
DELAYED FOUR MONTHS AT OW'S REQUEST,
OPPE PROJECTS DECISION MEMO TO AAs
3/84 .
O TOXICS INTEGRATION TASK FORCE
RECOMMENDATIONS SUBMITTED TO SENIOR
MANAGEMENT ON SCHEDULE.
o INTEGRATED ENVIRONMENTAL
MANAGEMENT PROJECT:
- IRON & STEEL STUDY
SCHEDULE REVISED TO REFLECT 2-1/2
MONTH DELAY. OPPE PROJECTS NEXT
MILESTONE BY 2/84.
- ORGANIC CHEMICAL STUDY
SCHEDULE REVISED TO REFLECT 10 MONTH
DELAY DUE TO POSTPONEMENT OF RELATED
EFFLUENT GUIDELINE. NOW DUE 9/84.
-137-
-------
OFFICE OF POLICY, PLANNING AND EVALUATION
MEETING PROGRAM COMMITMENTS
ITEM
STATUS
o REGULATORY ANALYSIS CRITERIA
DRAFT SUBMITTED TO SENIOR MANAGEMENT
ON SCHEDULE.
o AGENCY STATUTORY AUTHORITY
REVIEW
PROJECT INITIATED ONE MONTH BEHIND
ORIGINAL SCHEDULE.
o RISK MANAGEMENT
IMPLEMENTATION PLAN TO SENIOR MANAGEMENT
ON SCHEDULE.
O REGULATORY NEGOTIATION PROJECT
SCHEDULE CURRENTLY UNDER REVISION TO
REFLECT CHANGES IN PROJECT DESIGN.
-138-
-------
OFFICE OF EXTERNAL AFFAIRS
OFFICE OF FEDERAL ACTIVITIES
TABLE OF CONTENTS
GOAL PAGE
MEETING PROGRAM COMMITMENTS 140
-139-
-------
MEETING PROGRAM COMMITMENTS
- —_,_-.--„— -•-" -- • ------ — •- — —- -^ •— ""•-
SECTION 404 DREDGED OR FILL REVIEW
o DURING THE FIRST QUARTER, THE REGIONAL OFFICES REVIEWED 1,282 DREDGE
OR FILL PERMIT APPLICATIONS. APPROXIMATELY 25 PERCENT OF THESE
*
APPLICATIONS WARRANTED EPA COMMENTS OR RECOMMENDED DENIALS.
o REGIONS III, V AND X PERFORMED ALMOST 50% OF THE REVIEWS THIS QUARTER,
o OF THE 594 REVIEWS OF PERMIT APPLICATIONS WITH EPA COMMENTS OR
RECOMMENDED DENIALS THAT WERE PENDING DURING THE FIRST QUARTER, 216
(ABOUT 36%) WERE RESOLVED BY THE END OF THE QUARTER.
o NINETY-THREE PERCENT OF THE RESOLUTIONS WERE RESOLVED THROUGH
CORPS OF ENGINEERS ACCEPTANCE OF EPA COMMENTS OR BY THE CORPS DENIAL
OF THE PERMIT. SEVEN PERCENT OF EPA'S COMMENTS OR DENIAL
RECOMMENDATIONS WERE OVERRULED BY THE CORPS.
-140-
-------
SECTION 404 REVIEW
REVIEWS WITH EPA COMMENTS
RESOLUTIONS
400-1
K>
Number of
404 R«vl«w»
- during ih«
0 quarter 1,282
250-1
200-
»o^
100-1
50-
-141-
-------
MEETING PROGRAM COMMITMENTS
SECTION 309 ENVIRONMENTAL ASSESSMENT REVIEW
o DURING THE FIRST QUARTER, 778 FEDERAL ACTIONS/PROJECTS WERE IDENTIFIED
FOR §309 REVIEW. THE REGIONS AND HEADQUARTERS COMPLETED REVIEWS FOR
544 OF THESE ACTIONS/PROJECTS. THE OFFICE OF FEDERAL ACTIVITIES
EXCEEDED ITS TARGET BY COMPLETING 96.3 PERCENT OF THE §309 REVIEWS
ON TIME.
o REGIONS I, II, IV, VI AND X COMPLETED 100% OF THEIR §309 REVIEWS ON
TIME. HEADQUARTERS COMPLETED 65.2 PERCENT OF ITS REVIEWS ON TIME.
REGION VIII COMPLETED 77 PERCENT ON TIME.
-142-
-------
SECTION 309 REVIEWS
First Quarter September 30,1983 To December 31,1983
fc
600-1
500-
4OO-
300-
200-
WO-
96.3X OF 309 REVIEWS
COMPLETED ON TIME
il
§1
-143-
-------