PREFACE
This quarterly report reviews Agency progress in meeting its priority
program commitments. The report is a major component of the Agency
Strategic Planning and Management System (SPMS). SPMS provides a
process for the Agency to identify national goals and priorities,
issue timely guidance to the field, identify measures of success and
track progress against them. Each guarter the Office of Management
Systems and Evaluation publishes the report using information provided
by Headquarters, regional offices and state agencies. The Office of
Compliance Analysis and Program Operations is responsible for the
enforcement sections of this report.
We gratefully acknowledge the assistance and cooperation of the many
people throughout the environmental protection management network who
have made timely production of this report possible.
-------
TABLE OF CONTENTS
OFFICE
OFFICE OF AIR AND RADIATION . 1
OFFICE'OF WATER 35
OFFICE OF SOLID WASTE
AND EMERGENCY RESPONSE 93
OFFICE OF PESTICIDES AND
TOXIC SUBSTANCES 119
OFFICE OF ENFORCEMENT
AND COMPLIANCE MONITORING 153
OFFICE OF RESEARCH
AND DEVELOPMENT 161
OFFICE OF ADMINISTRATION AND
RESOURCES MANAGEMENT 165
OFFICE OF POLICY, PLANNING
AND EVALUATION 177
OFFICE OF EXTERNAL
AFFAIRS 1R3
OFFICE OF GENERAL COUNSEL -. 195
-i i i -
-------
OFFICE OF AIR AND RADIATION
-------
SECOND QUARTER HIGHLIGHTS
o THE REGIONS COLLECTIVELY EXCEEDED THEIR FIXED BASE SIGNIFICANT
VIOLATOR TARGET AND IDENTIFIED 111 NEW SIGNIFICANT VIOLATORS.
o AIR ENFORCEMENT ACTIVITY WAS STRONG FOR BOTH ADMINISTRATIVE ORDERS
AND CIVIL REFERRALS.
O OAQPS HAS COMPLETED AN EXTENSIVE SURVEY ON THE STATUS OF ACTIONS IN
-NONATTAINMENT AREAS AND THE STATUS OF SIP DEFIENCIENCIES.
O THE SIP BACKLOG GROWS IN HEADQUARTERS, BUT OAQPS PREDICTS THE BACKLOG
WILL DECREASE DURING THE THIRD QUARTER. REGIONS PROCESSED 100% ON
TIME.
o STATES/REGIONS ARE BEHIND SCHEDULE IN SUBMITTING STACK HEIGHT ACTION
PLANS.
O STATES ARE AHEAD OF SCHEDULE IN CORRECTING PROGRAM DEFICIENCIES
FOUND DURING THE FY 1985 NATIONAL AIR AUDITS.
o THE STATE REFERRAL PROGRAM FOR AIR TOXICS WILL NEED TO UNDERGO CHANGES
IN IMPLEMENTATION APPROACH.
-3-
-------
NUMBER OF NONATTAINMENT AREAS
o THE BAR CHARTS IDENTIFY THE NUMBER OF PRIMARY NONATTAINMENT AREAS
(BY POLLUTANT) FOR EACH REGION AND NATIONALLY. NATIONALLY, AS OF
MARCH 31, 1986, THERE WERE 692 PRIMARY NONATTAINMENT AREAS: 364
FOR OZONE, 132 FOR TSP, 13H FOR CO, 54 FOR S02 AND 4 NOX ARE~AS (IN
REGION IX). IN ADDITION, THERE WERE 206 SECONDARY STANDARD
NONATTAINMENT AREAS (191 TSP AND 15 SO2).
o IN ADDITION, THERE ARE A FEW AREAS WHICH ARE IN ATTAINMENT STATUS
BUT HAVE MONITORED VIOLATIONS.
O THE SECOND QUARTER TOTALS ARR SIMILAR TO THE FIRST QUARTER. THERE
IS A DECREASE OF 6 PRIMARY AREAS AND AN INCREASE OF 3 SECONDARY
AREAS DUE TO A FEW REDESIGNATIONS AND REFINEMENTS TO THE ORIGINAL
DATA.
O THE TOTAL NUMBER OF NONATTAINMENT AREAS (898) COMPARES .TO A TOTAL OF
1047 AREAS DURING FEBRUARY 1983.
-4-
-------
135-
O 90-
e
03
45
u>
NUMBER OF PRIMARY NON-ATTAINMENT AREAS *
. As of March 31, 1986
I
1
n
^
%
n
m
III IV
VII VIII IX
REGIONS
There are more 'Non attainment Areas' than areas
with Non attainment, since some areas are Non-attainment
for more than one pollutant.
TOO-i
00-
800-
400
JOOl
200-
100
NATIONAL TOTALS
12/31/B5 CURRENT
QUARTER
S02
TSP
CO
OZONE
-------
PROJECTED ATTAINMENT DATES FOR NONATTAINMENT AREAS
THE TABLE PRESENTS A SUMMARY OF ACHIEVED OR EXPECTED ATTAINMENT DATES
PROVIDED BY THE REGIONS.
THE REGIONS IDENTIFIED:
o 138 AREAS WHICH HAVE PROBABLY ALREADY ATTAINED AND NEED REDESIGNATION.
O 165 AREAS EXPECTED TO ATTAIN FROM 19R6 TO 1988.
o 595 AREAS FOR WHICH REGIONS ARE UNABLE TO PREDICT ATTAINMENT DATES THIS
TIME. MANY OF THESE AREAS ARE FOR PM10, RURAL OZONE, OR AREAS WITH
CURRENTLY DEFICIENT SIPS.
-------
PROJECTED ATTAINMENT DATES FOR NONATTAINMENT AREAS
POLLUTANT
TSP
TSP
CO
03
ATTAINMENT DATE
p - primary standard
s - secondary standard
NOX TOTAL
1984 AND BEFORE
1985
1986
1987
1988
1989
,1990
AFTER 1990
UNABLE TO PREDICT
TOTAL
19
7
0
9
0
0
0
0
97
132
8
7
1
6
0
0
0
0
169
191
1-4
3
1
2
2
0
o
0
32
54
4
1
0
1
0
0
0
0
9
15
6
6
5
38
0
0
0
0
83
138
54
9
10
90
0
0
0
0
201
364
0
0
0
0
0
0
0
0
4
4
105
33
17
146
2
0
0
0
595
898
7
-------
ACTIONS BEING TAKEN IN NONATTAINMENT AREAS
THE REGIONS AND OAR HAVE COMPLETED AN ANALYSIS OF STATUS AND ACTIONS FOR
THE AREAS IN NONATTAINMENT. THE FOLLOWING CATEGORIES GENERALLY OUTLINE
THEIR FINDINGS (THE NUMBERS ARE NOT FINITE, BUT GENERALLY PROVIDE PICTURE
OF STATUS):
o 225 AREAS (28%) ARE FY 1987 EXTENSION AREAS FOR 03 AND CO. THESE
AREAS ARE IMPLEMENTING PLANS TOWARDS THE 12/31/87 ATTAINMENT DEADLINES
o 183 AREAS (20%) ARE COVERED IN THE LIST OF "SIP CALL" AREAS OR ARE
AREAS WITH OUTSTANDING SIP CONDITIONS.
o 140 (16%) ARE AREAS WHERE REDESIGNATION TO ATTAINMENT HAS BEEN
REQUESTED (77) OR WHERE ATTAINMENT HAS BEEN REACHED AND THE REGIONS
EXPECT A REQUEST FOR REDESIGNATION (63).
o 116 (13%) ARE PARTICULATE AREAS THAT HAVE BEEN ESSENTIALLY "ON HOLD"
AWAITING PROMULGATION OF PM10.
O 82 (9%) ARE AREAS WHERE THE SIP IS FULLY APPROVED.
o 72 AREAS (8%) FALL UNDER THE DEFINITION OF RURAL OZONE GENERALLY
MEANING THAT THEIR STATUS WILL LIKELY CONTINUE UNTIL UPWIND (URBAN)
AREAS CONTROL EMISSIONS.
o 14 (2%) AREAS (13 OZONE) ARE NOT ATTAINING THE STANDARD BUT THEIR
LEVELS ARE BELOW THE "CUT POINT" FOR REQUESTING A REVISED SIP.
o 13 (1%) ARE AREAS SUBJECT TO ANALYSIS UNDER THE REVISED STACK HEIGHT
RULES.
o THE REMAINING AREAS (ABOUT 50) ARE UNCLASSIFIED WITHIN THE ABOVE
BREAKOUT.
-------
SIP DEFICIENCIES
o FOR THE SECOND QUARTER THE.REGIONS IDENTIFIED 219 DEFICIENT SIPS.
REGION V CONTAINED 47% OF THE DEFICIENT SIPSi SUMMARY STATUS
INFORMATION:
- 71 AREAS (32%) HAVE SIPS THAT ARE NOT FULLY APPROVED.
- 45 AREAS (21%) HAVE BEEN ISSUED CALLS FOR SIP REVISIONS.
- 37 AREAS (17%) HAVE APPROVED PLANS THAT HAVE BEEN CONDITIONALLY
APPROVED.
- 35 AREAS (16%) HAVE DISAPPROVED SIPS, GENERALLY WITH SANCTIONS.
- 31 AREAS (14%) HAVE INCOMPLETE OR INADEQUATE SIPS.
o BOTH THE STATES AND EPA HAVE RESPONSIBILITY FOR FOLLOW-UP ACTION.
- EPA HAS THE NEXT ACTION FOR 109 OF THE AREAS, WHILE
, - THE STATES HAVE THE NEXT ACTION ON 94 OF THE AREAS.
- FOR 16 AREAS, THE NEXT STEP IS NOT IDENTIFIED.
-------
SIP DEVELOPMENT
NUMBER OF SIP CALL REVISIONS DUE FROM STATES
o THROUGH THE SECOND QUARTER, 28 SIP REVISIONS WERE DUE FROM THE STATES.
THE REGION HAVE RECEIVED 25 REVISIONS THROUGH THE QUARTER. MOST
REGIONS MET OR EXCEEDED THEIR TARGET.
STACK HEIGHT PLANS .
o STACK HEIGHT ACTION PLANS FOR 55 STATES AND TERRITORIES WERE DUE IN
THE FIRST QUARTER. ONLY 40 OF THESE PLANS WERE SUBMITTED IN THE
FIRST QUARTER. DURING THE SECOND QUARTER THREE ADDITIONAL PLANS
WERE RECEIVED. TWELVE PLANS HAVE NOT BEEN SUBMITTED.
- ONLY STATES IN REGION I, IV, AND VII HAVE SUBMITTED ALL REQUIRED PLANS,
- LARGEST SHORTFALL IS IN REGION X (ONLY 1 OF 4).
REGIONS II, III, V AND VI ARE EACH MISSING ONE PLAN. REGIONS VIII
AND IX LACK TWO PLANS.
o REGIONS ARE ALSO REQUIRED TO SUBMIT MONTHLY REPORTS TO OAR ON PROGRESS
TOWARD COMPLETION OF ACTION ITEMS IN STATE PLANS. ONLY REGION I HAS
FULLY MET COMMITMENT.
-------
PERCENT OF SIP ACTIONS PROCESSED ON TIME (HQ)
O HO WAS RESPONSIBLE FOR 143 SIP ACTIONS IN THE SECOND QUARTER. THE
TOTAL INCLUDES 79 NEWLY DUE ACTIONS AND 64 DUE FROM THE PREVIOUS
OUARTER(S).
o PROCESSING RATES FOR NEWLY DUE ACTIONS (EXCLUDING ACTIONS "ON HOLD"
AND THOSE RETURNED TO THE REGIONS) WAS 54% AND FOR CARRYOVER ACTIONS
WAS 57%. INCLUDING "ON HOLD" BUT EXCLUDING THOSE SIPS RETURNED TO
THE REGIONS, THE RATE WAS 34%.
O OF THE 143 ACTIONS IN THE SYSTEM DURING THE QUARTER 98 (68%) WERE
NOT PUBLISHED. FOR ACTIONS NOT PUBLISHED THE STATUS WAS: 9 WERE
RETURNED TO THE REGIONS, 38 ARE OVERDUE AMD 51 ARE ON POLICY HOLD.
o, OVERALL, THE NUMBER OF UNPROCESSED SIPS HAS INCREASED TO 98 FROM 39
A YEAR AGO AND 71 IN THE FOURTH QUARTER.
o THE 51 SIPS ON POLICY HOLD ARE DUE TO EMISSIONS TRADING (26), NRDC
SUIT (2), VOC COMPLIANCE SCHEDULE (16), AND BLOCK VS RUNNING ISSUES
(7).
- OAQPS HAS SET AN APRIL 30 TARGET DATE TO PROCESS THE 26 SIPS ON
HOLD FOR EMISSIONS TRADING AND HAS STARTED PROCESSING THE
BLOCK VS RUNNING SIPS.
- THE HIGH PRIORITY BEING PLACED ON THE "ON HOLD" SIPS HAS RESULTED
IN DELAYS IN PROCESSING NEWLY DUE SIPS.
-------
100-r*
LU
O
a:
UJ
o_
PERCENT OF SIP ACTIONS PROCESSED ON TIME (HQ)/
As Of March 30, 1986
# OF NEWLY DUE 52
ft OF CARRYOVER 9
2 3
QUARTERS
69
14
00
UJ
V)
o
LEGEND
Q NEWLY DUE
CARRYOVER
ON HOLD
35.7%
RETURNED TO REGION
6.37.
UNPUBLISHED
26.5%
PUBLISHED
31.5%
STATUS OF SIP ACTIONS
FOR HQ (#143)
BAR GRAPH DATA EXCLUDES "ON HOLD" & "RETURNED TO REGION" CATEGORIES
-------
PERCENT OF SIP ACTIONS PROCESSED (REGIONS)
o DURING THE SECOND QUARTER 151 SIP ACTIONS WERE DUE TO RE PROCESSED
IN THE REGIONS. THIS TOTAL INCLUDES 24 MINOR ACTIONS AND 131 MAJOR
ACTIONS. ALL THE ACTIONS WERE PROCESSED ON TIME.
O FOR THE YEAR THE REGIONS HAVE PROCESSED 315 OF 322 ACTIONS ON TIME
FOR A CUMULATIVE RATE OF 9R PERCENT.
o REGION V CONTINUES TO BE RESPONSIBLE FOR THE MAJORITY OF SIP ACTIONS,
THEY HAVE BEEN RESPONSIBLE FOR 194 OF THE 322 ACTIONS (60%) THIS
YEAR .
-------
PERCENT OF SIP ACTIONS PROCESSED ON TIME (REGIONS)
As Of March 31,1986
i
CURRENT QUARTER
# OF SIP ACTIONS 4 4
| OVERDUE 0 0
CUMULATIVE
, # OF SIP ACTIONS 7 9
# OVERDUE 0 1
III IV
3
0
12
0
14
0
V VI VII VIII
REGIONS
84 16 9 3
0000
25 194 22 16 6
42000
8
0
20
0
6
0
11
0
LEGEND
B CURRENT QUARTER
n CUMULATIVE
TOTALS
151
0
322
7
-------
NATIONAL AIR AUDIT SYSTEM - CORRECTION OF STATE DEFICIENCIES
o DURING THE FY 1985 STATE AUDITS, THE REGIONS IDENTIFIED 176 DEFICIENCIES
(PREVIOUSLY REPORTED AS 159). DURING 19R6 THE REGIONS HAVE COMMITTED
TO CORRECTING 77 OF THESE PROBLEMS.
o THROUGH THE SECOND QUARTER 17 OF THE DEFICIENCIES WERE CORRECTED
COMPARED TO A TARGET OF 8. NO REGION MISSED A TARGET. REGIONS I AND
IV CORRECTED 7 AND 5 PROBLEMS AGAINST TARGETS OF 3 AND 2 RESPECTIVELY.
o FOLLOWING IS A LIST OF DEFICIENCIES CORRECTED:
REGION I
REGION II
REGION III
VT - LATEST EPA MODELS
ON COMPUTER
MA - GAS TANK TRUCK
REGULATION
- 1983 RFP REPORT
- RESINS REGULATION
- SULFURIC ACID MIST
REGULATION
CT - 1984 RFP REPORT
- >100 TON NON-CTG
REGULATION
NJ - ACCESS THE UNAMAP
PROGRAMS
DE - IMPROVE MODELING
CAPABILITIES
VA - INFO EXCHANGE
BETWEEN R.O.'s
IN NA AREAS
REGION IV AL -
FL -
NC -
REGION V WI -
PART D TSP PLAN
FOR ETOWAH CO.
LEAD SIP
JEFFERSON CO.
LEAD SIP
S.O.P; FOR AIR
MONITORING
PRIOR APPROVAL
TO CHANGE
GUIDELINE MODELS
LEAD AUDIT SAMPLE
PREPARATION
REGION IX NV - I/M CUTPOINTS
-------
I
NATIONAL AIR AUDIT SYSTEM
-CORRECTION OF STATE DEFICIENCIES
As Of March 31, 1986
2 3
QUARTERS
LEGEND
ITAAGCT
QACTUAL
-1 7-
-------
TIMELY REPORTING OF NAMS DATA
O NATIONALLY, REPORTING RATES CONTINUED TO FALL FROM THE IMPROVED
RATES OF LAST YEAR. RATES FOR CONTINUOUS ANALYZERS (85%) AND PRECISION
AND ACCURACY (70%) REPORTING FELL THREE AND FOUR PERCENT RESPECTIVELY.
INTEGRATED SAMPLER RATES REMAINED THE SAME AT 82 PERCENT.
o REGIONAL RATES FELL IN EIGHT REGIONS AS ONLY TWO REGIONS SHOWED
IMPROVEMENT.
- REGION X SHOWED A SUBSTANTIAL IMPROVEMENT WITH GAINS IN ALL THREE
CATEGORIES TO RANK 3RD OVERALL AMONG THE REGIONS.
- REGION VII ALSO SHOWED SOME IMPROVEMENT OVERALL.
o REGIONS I AND III, WHILE HAVING MODEST DECREASES, CONTINUE TO BE THE
TOP PERFORMERS.
O REGIONS VIII AND IX WERE THE LOWEST PERFORMERS:
- REGION VIII WHICH HAD IMPROVED STEADILY OVER TH F, LAST YEAR SHOWED
LARGE DROPS (30+%) IN ALL CATEGORIES DUE TO LATE REPORTING FROM
UTAH .
PMm MONITORING NETWORK DEVELOPMENT
o OAR IS TRACKING EFFORTS TO OPERATIONALI'ZE PM^Q MONITORS IN FY 1986.
- 83% OF THE 662 EPA SUPPLIED SAMPLERS WERE IN OPERATION BY THE END
OF THE SECOND QUARTER..
- 33% OF THE 57 MONITORS PURCHASED BY STATES IN FY 1986 ARE
OPERATIONAL EXCEEDING EXPECTATIONS.
- A TOTAL OF 771 PMjQ MONITORS ARE NOW IN OPERATION, AN INCREASE OF
96 OVER THE FIRST QUARTER.
-------
100
75-
Ul
O
or
LJ
0.
50-
25-
LJ
(ft
O
PERCENT OF NAMS DATA REPORTED
As Of March 31, 1986
^
1
1
X
X
X
X
X
X
X
X
X
X
X
x
X
1 III
£
IV
j
I
X
X
X
x
X
x
y
x
y
x
Y
x
x
x
x
x
x
X
X
X
X
A,
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
1
1
V VI VII VIII IX
REGIONS
x
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
Xj
X
X
<
X
X
X
X
X
X
<
X NATIONAL
AVERAGES
LEGEND
GOAL
NAMS DATA FROM CONTINUOUS ANALYZERS
NAMS DATA FROM 24 HOUR INTEGRATED SAMPLERS
P & A REPORTING ORGANIZATIONS
-------
STATUS OF MOBILE SOURCE PROGRAMS
ESTABLISHMENT OF NEW ANTI-TAMPERING PROGRAMS
o THERR HAVE BEEN EIGHT NEW ANTI-TAMPERING PROGRAMS INITIATED AGAINST
, A SECOND QUARTER TARGET OF FOUR. DURING THE SECOND QUARTER PROGRAMS
WERE STARTED IN DALLAS, FORT WORTH, EL PASO, TULSA, BAKERSFIELD,
AND MEDFORD (THESE PROGRAMS WERE PART OF NEW I/M PROGRAMS).
o OAR'S CURRENT ESTIMATE FOR COMPLETING THE ANTI-TAMPERING RACT POLICY
GUIDANCE IS 11/28/86.
STATUS OF I/M PROGRAM IMPLEMENTATION
o NATIONALLY THERE ARE 50 I/M PROGRAMS OPERATING. THIS INCLUDES SEVEN
NEW STARTS IN FY 1986 (DETROIT, TULSA, BAKERSFIELD, DALLAS, FORT WORTH,
EL PASO, AND MEDFORD).
o THERE ARE TEN I/M PROGRAMS REQUIRED BUT NOT YET IMPLEMENTED. TWO OF
THESE PROGRAMS HAVE SANCTIONS (CINCINATTI SUBURBS, KY. AND ALBUQUERQUE,
N.M.). ALL OF THESE PROGRAMS HAVE PROJECTED START DATES IN EITHER 1986
OR 1987.
COMPLETION OF I/M AUDITS
o THE REGIONS HAVE CONDUCTED NINE I/M AUDITS AND ONE FOLLOW-UP AUDIT
THROUGH THE SECOND QUARTER EXCEEDING THEIR TARGET BY,TWO.
STATUS OF EFFORTS TO REMEDY CRITICAL I/M OPERATING PROBLEMS
o THE REGIONS HAVE COMMITTED TO CORRECT 16 I/M OPERATING PROBLEMS FOUND
DURING RECENT I/M AUDITS. THROUGH THE SECOND QUARTER QMS HAS DETERMINED
THAT FIVE PROBLEMS HAVE BEEN REMEDIED AGALNST A TARGET OF TWO. THE
PROBLEMS REMEDIED WERE IN MASS., IND., TEX., MO., AND COLO.
-------
STATUS OF I/M AND ANTI TAMPERING PROGRAMS
As of March 31, 1986
NEW A/T PROGRAMS
on
LJ
ca
ce
LJ
m
234
QUARTERS
I/M AUDITS (NEW AND FOLLOW-UP)
20-i
15-
10-
5-
(/)
2
O
V
2 3
QUARTERS
LEGEND
QTARGET
| ACTUAL
I/M PROGRAM STATUS
TOTAL PROGRAMS OPERATING
PROGRAMS NOT IMPLEMENTED
NEW FY86 STARTS
I 1 1 "~1 1
10 20 30 40 50
20-
NUMB£R
I/M PROBLEMS REMEDIED
Ct
LJ
00
Z>
234
QUARTERS
-------
AIR TOXICS STATUS
STATUS OF TARGETED REFERRAL PROGRAM
MEETINGS HAVE BEEN HELD WITH STAPPA/ALAPCO TO REACH AGREEMENT ON SPECIFIC
CRITERIA FOR IMPLEMENTING THE PROGRAM. WHILE THERE IS SOME SUPPORT FOR
THE GENERAL CONCEPT, EPA AND THE STATES WERE UNABLE TO REACH AGREEMENT
ON THE REFERRAL PROGRAM. THE STATES INSIST ON FEDERAL BACK-UP AND
CONSISTENCY IN CASES WHERE STATES DO NOT FOLLOW THROUGH ON A REFERRAL.
SINCE EPA FEELS THIS APPROACH WOULD BE AN INAPPROPRIATE USE OF LIMITED
REGULATORY RESOURCES, OAR HAS DECIDED TO REORIENT THE PROGRAM TO FOCUS
ON THE BROADER GOAL OF ENHANCING STATE AIR TOXICS PROGRAMS WITH EMPHASIS
ON POINT SOURCES. STATES WOULD BE EXPECTED TO TAKE THE INITIATIVE ON
NON-NESHAP POINT SOURCES THAT ARE OF LOCAL IMPORTANCE BUT NOT THROUGH
SPECIFIC REFERRALS. THIS HAS ALREADY BEEN IMPLEMENTED INFORMALLY FOR
SEVERAL SOURCES OF POLLUTANTS WHICH EPA HAS DECIDED NOT- TO REGULATE.
OAR WILL DISCUSS THIS APPROACH SOON WITH STAPPA AND ALAPCO AND THEN
ALLOCATE, THROUGH THE REGIONS, ABOUT $200,000 IN PROGRAM GRANT FUNDS
HELD IN RESERVE FOR THIS PURPOSE.
-------
SURVEY OF THE STATUS OF STATE AND LOCAL ACCIDENT PREVENTION PROGRAMS
o RESPONSES RECEIVED FROM 55 STATES/TERRITORIES AND 30 LOCALS.
o TWELVE STATES OR LOCALS IDENTIFIED EITHER A REGULATORY PROGRAM OR
ARE MOVING (WITH SOME CERTAINTY) TOWARDS A PROGRAM.
- NEW JERSEY ONLY AGENCY WITH FORMAL, LARGE REGULATORY PROGRAM NOW
IN PLACE.
4 STATES (TEX., LA., OKLA., OHIO) HAVE INFORMAL PROGRAMS GENERALLY
ON PERMIT REVIEW FOR SELECTED SOURCES.
- 6 STATES AND ONE LOCAL HAVE DEVELOPMENT EFFORTS UNDERWAY (CAL.,
SOUTH COAST DISTRICT, N.Y., FLA., CONN., MASS., ILL.).
o IN ADDITION TO THE PROGRAMS FOR ACCIDENT PREVENTION ABOUT HALF OF THE AIR
AGENCIES REPORT CONNECTIONS TO PREVENTION PROGRAMS THROUGH THEIR MALFUNCTION
REGULATIONS WHICH GENERALLY INVOLVE ONLY REPORTING REQUIREMENTS.
o ABOUT HALF OF THE AIR AGENCIES ARE PROVIDING TECHNICAL SUPPORT TO
CEPP AND OTHER AGENCIES RESPONSIBLE FOR ACCIDENTS.
O SOME INFORMATION ON RESOURCES BEING EXPENDED WAS PROVIDED. ABOUT
$2.2 MILLION IS A BEST GUESS FOR THE AGENCIES REPORTING, NOT*COUNTING
POTENTIALLY LARGE EXPENDITURES IN CALIFORNIA AND ILLINOIS.
-------
AIR COMPLIANCE INSPECTIONS AND COMPLIANCE RATES
o THE REGIONS GENERALLY MET OR EXCEEDED THEIR INSPECTION TARGETS
DURING THE SECOND QUARTER WITH A FEW EXCEPTIONS:
- REGIONS I, VII, AND X WHICH MET 80%, 32%, AND 90% OF THEIR NSPS
TARGETS, RESPECTIVELY.'
- REGION IX ADDRESSED 86% OF THEIR TARGETED NESHAP SOURCES AND
REGION VII DID NOT ADDRESS ANY.
o COMPLIANCE RATES FOR CLASS Al SIPS DECLINED SLIGHTLY FROM 89% TO
88%. THIS IS DUE LARGELY TO A SIGNIFICANT INCREASE IN THE INVENTORY
IN REGION V, AND A RECLASSIFICATION EFFORT IN ILLINOIS.
o COMPLIANCE RATES FOR NSPS AND NESHAP REMAIN STEADY AT 90% AND 87%.
NOTE: THIS IS THE FIRST REPORTING UNDER THE ONE QUARTER DATA LAG
INSTITUTED IN FY 1986.
-------
AIR COMPUANCE INSPECTIONS
AND COMPUANCE LEVELS
As Of March 31, 1986
Inspection Levels For Class A1 SIP, NSPS & NESHAP
09-1
100
3
P 90
REGIONS
Legend
CD CLASS A1 SIP
E2 NSPS
I NESHAP
£
5
"TAftOCT
VIII IX
REPORTED COMPUANCE LEVELS
CLASS A1 SIP I7.7X
NSPS M.7X
NESHAP B7.3X
-------
PROGRESS IN RETURNING SIGNIFICANT AIR VIOLATORS TO COMPLIANCE
O THE REGIONS AND THE STATES IDENTIFIED 647 SIGNIFICANT VIOLATORS
AT THE BEGINNING OF THE FISCAL YEAR.
- 143 (22%) STARTED THE YEAR WITH AT LEAST AN ENFORCEMENT ACTION
INITIATED. BY THE END OF THE SECOND QUARTER, 21 (15%) RETURNED
TO COMPLIANCE, 28 (19%) HAVE BEEN PLACED ON ACCEPTABLE SCHEDULES,
AND 94 (66%) WERE PENDING ENFORCEMENT ACTION.
- 504 (78%) WERE UNADDRESSED AND BY THE END OF' THE SECOND QUARTER,
THE REGIONS ADDRESSED 235 EXCEEDING THEIR TARGET OF 167. OF THE
235 SIGNIFICANT VIOLATORS, 137 RETURNED TO COMPLIANCE, 48 WERE
PUT ON SCHEDULES, AND 50 ARE PENDING ENFORCEMENT ACTION.
o THE REGIONS IDENTIFIED 111 NEW SIGNIFICANT VIOLATORS DURING THE
QUARTER, BRINGING THE TOTAL FOR THE YEAR TO 224. BY THE END OF THE
SECOND QUARTER OF FY 1985, 191 VIOLATORS HAD BEEN IDENTIFIED.
ACTIVITY WAS WELL DISTRIBUTED AMONG ALL THE REGIONS.
o OF THE 224 NEW SIGNIFICANT VIOLATORS, 12 HAVE BEEN PLACED ON
ACCEPTABLE SCHEDULES, AND 22 RETURNED TO COMPLIANCE, LEAVING 183
TO BE ADDRESSED.
-------
PROGRESS IN RETURNING SIGNIFICANT AIR VIOLATORS TO COMPLIANCE
As Of March 31,1986
REDUCTION OF FIXED BASE
PENDING AS OF OCTOBER 31.1985
RESPONSE TO NEW VIOLATIONS
(DYNAMIC BASE)
250-1
200
»
unca
BOY 1 2 3 4
QUARTERS
IONACCOTAMII
-------
AIR ENFORCEMENT ACTIVITY
o EPA ISSUED 45 ADMINISTRATIVE ORDERS IN THE SECOND QUARTER FOR A
CUMULATIVE TOTAL OF 73. AT THE END OF THE SECOND QUARTER LAST YEAR
35 ORDERS HAD BEEN ISSUED.
o STATES INITIATED 178 ADMINISTRATIVE ACTIONS FOR A CUMULATIVE TOTAL
OF 367. ACTIVITY WAS MORE EQUALLY DISTRIBUTED AMONG THE REGIONS
THAN IN THE FIRST QUARTER. . ' '
O THE REGIONS REFERRED 30 CIVIL CASES IN THE SECOND QUARTER FOR A
CUMULATIVE TOTAL'OF 49. LAST YEAR THE CUMULATIVE TOTAL WAS 31 BY
THE END OF THE SECOND QUARTER.
o STATE JUDICIAL REFERRALS DECLINED FROM 57 IN THE FIRST QUARTER TO
20 IN THE SECOND QUARTER.
NOTE: STATE DATA IS LAGGED ONE QUARTER.
-------
AIR ENFORCEMENT ACTIVITY
As Of March 31,1986
ADMINISTRATIVE ORDERS
CJVIL REFERRALS
22S
200
ITS
no
as
to
80
70-
0
SO
f
04 1 2
FY-85
40-
III
QUARTERS
Legend
CH STATES
1EPA
04 1
FY-B5
QUARTERS
-------
AIR - FEDERAL FACILITY COMPLIANCE
o THE COMPLIANCE RATE FOR CLASS.Al SIP FEDERAL FACILITIES IS 89%,
THIS IS A SLIGHT DECLINE FROM LAST QUARTER WHEN THE REGIONS WERE
AT 91%.
o THE COMPLIANCE RATE FOR NSPS FEDERAL FACILITIES IS 100%.
o THE NESHAP COMPLIANCE RATE IS 75% WHICH IS UP FROM 69% IN THE FIRST
QUARTER. THE REMAINING 25% OF FEDERAL FACILITY NESHAP SOURCES ARE
UNKNOWNS FROM REGION V THAT REPRESENT AN INCREASE TO THE INVENTORY.
o THE REGIONS IDENTIFIED 7 FEDERAL FACILITIES AS SIGNIFICANT VIOLATORS
AT THE BOY. ONE SOURCE WAS PLACED ON AN ACCEPTABLE SCHEDULE DURING
THE FIRST QUARTER MEETING THE SECOND QUARTER TARGET OF 1. NO NEW
SIGNIFICANT VIOLATORS WERE IDENTIFIED IN THE SECOND QUARTER.
-------
too
AIR - FEDERAL FACILITY COMPLIANCE
As Of March 31.1986
COMPLIANCE RATES
234
QUARTERS
i CLASS A1OT
GBMSPS
CDNOHAP
10 -i
SIGNIFICANT VIOLATORS
BOY 1 234
QUARTERS
-------
ASBESTOS DEMOLITION AND RENOVATION ACTIVITY
o DURING THE SECOND QUARTER EPA AMD THE STATES RECEIVED 6,341
NOTIFICATIONS OF ASBESTOS DEMOLITION.
O THE REGIONS AND THE STATES CONDUCTED 3,514 INSPECTIONS AND
DISCOVERED 560 VIOLATIONS.
o EPA ISSUED 19 ADMINISTRATIVE ORDERS AND REFERRED 6 CIVIL ACTIONS IN
THE SECOND QUARTER AND THE STATES ISSUED 21 ADMINISTRATIVE ACTIONS.
NOTE: THIS IS THE FIRST REPORTING UNDER THE ONE QUARTER DATA LAG
INSTITUTED IN FY 1986.
-------
7000-
eooo
5000
4000
3OOO-
2000
lOOO-i
ASBESTOS DEMOLITION AND RENOVATION ACTIVITY
As Of March 31, 1986
NUMBER
or
NOTIFICATIONS
OF
INSPECTIONS
NUMBER
OF
VIOLATIONS
-------
OFFICE OF WATER
-------
_ "5 C
-------
OFFICE OF WATER
SECOND QUARTER HIGHLIGHTS
o THE STATES ARE SIGNIFICANTLY AHEAD OF SCHEDULE FOR INCORPORATING
NUMERICAL CRITERIA FOR TOXIC POLLUTANTS INTO STATE WATER QUALITY
STANDARDS, BUT ARE BEHIND SCHEDULE INCORPORATING NARRATIVE CRITERIA.
o TMDLS, STATE NONPOINT SOURCE MANAGEMENT AND 301(h) PROGRAMS ARE ON
SCHEDULE.
o EPA AND THE DELEGATED STATES ARE BASICALLY ON OR AHEAD OF SCHEDULE
IN REPERMITTING, WITH THE EXCEPTION OF STATE INDUSTRIAL REPERMITTING.
o EPA IS AHEAD OF SCHEDULE IN RESOLVING EVIDENTIARY HEARING REQUESTS.
THE DELEGATED STATES ARE BEHIND SCHEDULE.
o EPA AND THE DELEGATED STATES ARE BEHIND SCHEDULE IN BOTH APPROVING
'PRETREATMENT PROGRAMS AND CONDUCTING PRETREATMENT PROGRAM AUDITS.
o EPA AND THE DELEGATED STATES ARE ESSENTIALLY ON OR AHEAD OF SCHEDULE
IN IMPLEMENTING THE NATIONAL MUNICIPAL POLICY.
o THE CONSTRUCTION GRANTS PROGRAM IS GENERALLY ON SCHEDULE.
o WITH THE EXCEPTION OF EPA CLASS I PERMIT DETERMINATIONS, BOTH EPA AND
THE PRIMACY STATES ARE AHEAD OF SCHEDULE IN THE UIC PROGRAM. MOST
OF THE PERMITS WERE FOR NEW AS OPPOSED TO EXISTING WELLS.
O OVERALL COMPLIANCE RATES FOR ALL MAJORS DECLINED SLIGHTLY. THE
NUMBER OF SIGNIFICANT NONCOMPLIERS WHICH HAVE BEEN ON THE EXCEPTIONS
LIST FOR TWO QUARTERS WITHOUT AN ENFORCEMENT ACTION INCREASED SLIGHTLY,
o WITH THE EXCEPTION OF MONITORING AND REPORTING REQUIREMENTS FOR
TURBIDITY, THE PWS PROGRAM IS ON SCHEDULE.
-------
STATE WATER QUALITY STANDARDS
NUMERICAL CRITERIA
O 14 STATES ARE SCHEDULED TO INCORPORATE NEW OR REVISED NUMERICAL
CRITERIA FOR TOXIC POLLUTANTS INTO EPA-APPROVED STATE WATER QUALITY
STANDARDS (WQS) BY THE END OF THE YEAR.
O NATIONALLY, 4 STATES HAVE INCORPORATED NUMERICAL TOXIC CRITERIA INTO
EPA-APPROVED STATE WQS FOR 200% OF THE SECOND QUARTER TARGET. THE
STATES IN BOTH REGIONS SCHEDULED TO INCORPORATE TOXIC NUMERICAL CRITERIA
MET THEIR REGIONAL TARGETS.
NARRATIVE CRITERIA
O 16 STATES ARE SCHEDULED TO INCORPORATE NEW OR REVISED NARRATIVE
CRITERIA FOR TOXIC POLLUTANTS INTO EPA-APPROVED STATE WQS BY THE END
OF THE YEAR.
O NATIONALLY, OUT OF THE 6 STATES SCHEDULED, ONLY I STATE INCORPORATED
NARRATIVE TOXIC CRITERIA INTO EPA-APPROVED STATE WQS FOR 17% OF THE
SECOND QUARTER TARGET:
- A REGION V STATE MET ITS TARGET.
- REGIONS I AND VI STATES MISSED THEIR REGIONAL TARGETS.
-------
STATE WATER QUALITY STANDARDS
As of March 31, 1986
NUMERIC NARRATIVE
15-j
12-
i^ 9-
u.
O
fi
m e-
z>
2
3-
0.
16-
/
/ 12-
/
/ 8"
/ 6-
#
s/^"'
P i ii i 0-^
1234
*
i
t
*
»
«
«
*
/
/
/*
.j^ll r *
1234
QUARTERS QUARTERS
<£>
^ LEGEND
u ' IMKL.
-------
TOTAL MAXIMUM DAILY LOADS FOR TOXIC AND CONVENTIONAL POLLUTANTS
TOXICS
o AT THE BEGINNING OF FY 1936, THE REGIONS IDENTIFIED THE NEED TO DEVELOP
835 TOTAL MAXIMUM DAILY LOADS (TMDLs) TO CONTROL TOXIC POLLUTANT
DISCHARGES IN ORDER TO MEET WATER OUAL-ITY STANDARDS. THE REGIONS
COMMITTED TO COMPLETING 155 TMDLs IN FY 1986.
o THE REGIONS AND THE STATES HAVE COMPLETED 82, OR 200%, OF THE TMDLs
FOR TOXICS SCHEDULED THROUGH THE SECOND QUARTER. ALL 5 REGIONS
SCHEDULED TO COMPLETE TMDLs MET OR EXCEEDED THEIR TARGETS.
CONVENTIONALS
O AT THE BEGINNING OF FY 1986, THE REGIONS IDENTIFIED THE NEED TO
DEVELOP 1286 TMDLs TO CONTROL CONVENTIONAL POLLUTANT DISCHARGES IN
ORDER TO MEET WATER QUALITY STANDARDS. THE REGIONS COMMITTED TO
COMPLETING 300 TMDLs FOR CONVENTIONALS IN FY 1986.
o THE REGIONS AND STATES HAVE COMPLETED 114, OR 124%, OF THE TMDLs FOR
CONVENTIONALS SCHEDULED THROUGH THE SECOND QUARTER.
- REGIONS I, III, IV, VII AND VIII MET OR EXCEEDED THEIR TARGETS.
- REGIONS V AND VI MISSED THEIR TARGETS.
-------
TOTAL MAXIMUM DAILY LOADS FOR TOXIC AND CONVENTIONAL POLLUTANTS
As Of March 31, 1986
160-,
140-
CO-
^ 100-
O 80-
&
CD
60-
40-
20-
TOXICS
1 2 3
QUARTERS
NUMBER OF TMDLS NEEDED
835
tn
o
300-
250-
200-
LEGEND
ACTUAL
CONVENTIONALS
1 2 3
QUARTERS
1286
-------
STATE NONPOINT SOURCE MANAGEMENT PROGRAMS
o THE STATES ARE SCHEDULED TO DEVELOP 29 STATE NONPOINT SOURCE MANAGEMENT
PROGRAMS BY THE END OF THE YEAR. THE PROGRAMS ARE TO BE DEVELOPED
OR UPDATED.CONSISTENT WITH WATER QUALITY MANAGEMENT REGULATIONS AND
EPA'S NONPOINT SOURCE STRATEGY.
O NATIONALLY, THE STATES HAVE DEVELOPED OR UPDATED 13, OR 118%, OF THE
PROGRAMS TARGETED FOR THE SECOND QUARTER. THE STATES MET OR EXCEEDED
THEIR REGIONAL TARGETS.
-------
$
STATE NONPOINT SOURCE MANAGEMENT PROGRAMS
As of March 31, 1986
30-1
< 20
o:
o
o
a
U- 1i3
o
CL
Ul
GO
^ 101
5-
2'
QUARTERS
LEGEND
MSft.
ACTUAL
-------
INDUSTRIAL NPDES REPERMITTING BY EPA
o OW HAS COMMITTED TO REISSUING 193 MAJOR INDUSTRIAL PERMITS BY THE
END OF FY 1986.
O NATIONALLY, EPA HAS REISSUED 68 PEMITS, ACHIEVING 111% OF ITS SECOND
QUARTER TARGET. . -
- REGIONS I, TI, IV AND VI MET OR EXCEEDED THEIR TARGETS.
- REGIONS III, VIII, IX AND X MISSED THEIR TARGETS.
INDUSTRIAL NPDES REPERMITTING BY THE DELEGATED STATES
o THE DELEGATED STATES HAVE COMMITTED TO REISSUING 500 MAJOR INDUSTRIAL
PERMITS BY THE END OF FY 1986.
o NATIONALLY, THE STATES HAVE REISSUED 181 PERMITS-, ACHIEVING 79% OF
THEIR SECOND QUARTER TARGET.
- THE STATES IN REGIONS I, VII, AND IX MET OR EXCEEDED THEIR
REGIONAL TARGETS.
- THE STATES IN REGIONS II, III, IV, V, .VIII AND X MISSED THEIR
REGIONAL TARGETS.
-------
200-i
150-
5
or
LU
CL
U.
O
or
LU
CD
13
2
INDUSTRIAL NPDES REPERMITTING
As Of March 31, 1986
EPA
QUARTERS
NUMBER WHICH HAVE EXPIRED
OR WILL EXPIRE 8Y:
W EOY 85
O EOY 86
140
274
500-1
400-
300-
200-
100-
LEGEND
TARGET
ACTUAL
STATES
2 3
QUARTERS
431
673
-------
MUNICIPAL NPDES REPERMITTING BY EPA
o OW HAS COMMITTED TO REISSUING 204 MAJOR MUNICIPAL PERMITS BY THE END
OF FY 1986.
O NATIONALLY, i?PA HAS REISSUED 65 PERMITS, ACHIEVING 104% OF ITS SECOND
QUARTER TARGET,
- REGIONS I, VI AND IX MET OR EXCEEDED THEIR TARGETS.
- REGIONS II, IV, VIII AND X MISSED THEIR TARGETS.
MUNICIPAL NPDES REPERMITTING BY THE DELEGATED STATES
o THE DELEGATED STATES HAVE COMMITTED TO REISSUING 529 MAJOR MUNICIPAL
PERMITS BY THE END OF FY 1986.
O NATIONALLY, THE STATES HAVE REISSUED 252 PERMITS, ACHIEVING 90% OF
THEIR SECOND QUARTER TARGET.
- THE STATES IN REGIONS III, IV AND VII MET OR EXCEEDED THEIR
REGIONAL TARGETS.
- THE STATES IN REGIONS I, II, V, VIII, IX AND X MISSED THEIR REGIONAL
TARGETS.
-------
*
MUNICIPAL NPDES REPERMITTING
As Of March 31, 1986
EPA STATES
210 -i
180-
£ 150-
^
t£
it* 120-
L_
O
P^ 90-
m
s
=2 60-
30-
OH
600-i
t
t
«
/ 500-
t
' i
t
»
f 400-
/
t
,* 300-
*
/
«,''* 200-
/
100-
^-^"
i*^ r» j
I | j 1 j y-4
^,'
*
/
X
/
X
..-'
**
//
/
//
* s
./
4s
jr
r 1 i I I
1234 1234
QUARTERS LEGEND QUARTERS
TARGET m
lft ACTUAL"
S NUMBER WHICH HAVE EXPIRED
^ OR WILL EXPIRE BY:
LU
^ EOY 85 115 555
O EOY 86 279 67B
-A.7-
-------
NPDES SIGNIFICANT MINOR REPERMITTING BY EPA
o OW HAS COMMITTED TO REISSUING 626 SIGNIFICANT MINOR PERMITS BY THE
END OF FY 1986.
o NATIONALLY, EPA HAS REISSUED 374 PERMITS, ACHIEVING 179% OF ITS
SECOND QUARTER TARGET. ALL REGIONS ESSENTIALLY MET OR EXCEEDED
THEIR TARGETS.
NPDES SIGNIFICANT MINOR REPERMITTING BY THE DELEGATED STATES
o THE DELEGATED STATES HAVE COMMITTED TO REISSUING 2209 SIGNIFICANT
MINOR PERMITS BY THE END OF FY 1986.
O NATIONALLY, THE STATES HAVE REISSUED 3520 PERMITS, ACHIEVING 382%
OF THEIR SECOND QUARTER TARGET. THE. STATES IN ALL REGIONS EXCEEDED
THEIR REGIONAL TARGETS. .
-------
700-
600-
tn 500-
400-
CD
2
Z)
300-
200-
100-
$
2
O
NPDES SIGNIFICANT MINOR PERMITS
As Of March 31, 1986
EPA
1 2 3
QUARTERS
3600-1
3150-
2700-
2250-
1800-
1350-
900-
450-
LEGEND
TARGET
ACTUAL
STATES
1 2 3
QUARTERS
-------
RESOLVING EVIDENTIARY HEARING REQUESTS
o AT THE START OF FY 1986, 170 EVIDENTIARY HEARING REQUESTS WERE
PENDING. BY THE END OF THE YEAR EPA PLANS TO RESOLVE 35 AND THE
DELEGATED STATES PLAN TO RESOLVE 45.
EPA
o NATIONALLY, EPA HAS RESOLVED 18 HEARING REQUESTS, ACHIEVING 257% OF
ITS SECOND QUARTER TARGET. ALL 3 REGIONS SCHEDULED TO ACT ON THESE
REQUESTS EXCEEDED THEIR TARGETS.
DELEGATED STATES
o THE DELEGATED STATES HAVE RESOLVED 7 EVIDENTIARY HEARING REQUESTS,
ACHIEVING 70% OF THEIR SECOND-QUARTER TARGET. OF THE STATES SCHEDULED
TO ACT ON THESE REQUESTS, ONLY THE STATES IN REGION V MET THEIR
TARGET. THE STATES IN REGION II AND IV MISSED THEIR RESPECTIVE
TARGETS.
-------
RESOLVING EVIDENTIARY HEARINGS REQUESTS
As Of March 31, 1986
EPA STATES
35-
30-
f. 25-
(/)
ID
2 20-
a:
LL
O
CC 15"
CD
2
i »-
5-
0,
45-1
/
/ 40-
.»'
/ 35-
V
/ 30-
f
25-
9 /
/..* 20-
./'
.*'
15-
/
^ . 10-
-*' 5"
°£tr^1^^
^***^
1234
»*
/
$
i
/
f
/
\
f
f
/
/
'.
,«
,i**
x
1...»>t
.*' s>*
_.'' .X^^
s^
1234
QUARTERS QUARTERS
LEGEND
tO TARGET
*> NUMBER OF REQUESTS ACTUAL"
> PENDING AT * U L
|T BEGINNING OF YR. 51 11»
?
-51-
-------
301(h) OCEAN DISCHARGE PERMITS
o NINETY OF THE ORIGINAL 208 301(h) APPLICATIONS WERE PENDING AT THE
BEGINNING OF FY 1986.
O FIFTY-EIGHT APPLICATIONS REMAINED AT THE CLOSED OF THE SECOND QUARTER
AFTER:
- 23 FINAL DETERMINATIONS WERE MADE AND
9 APPLICATIONS WERE WITHDRAWN.
o NATIONALLY, EPA ISSUED 32 FINAL PERMITS THROUGH THE SECOND QUARTER
AGAINST A TARGET OF 18. ALL REGIONS MET OR EXCEEDED THEIR TARGETS.
o NATIONALLY, EPA ACHIEVED 67% OF ITS SECOND QUARTER TARGET OF 15 INITIAL
DECISIONS:
- REGIONS II AND IX EXCEEDED THEIR TARGETS.
- REGIONS I AND X MISSED THEIR TARGETS.
/
o THE'ADMINISTRATOR SIGNED TENTATIVE DENIALS FOR BAYAMON, GUAYAMA AND
ARECIBO, PUERTO RICO. HEADQUARTERS HAS DELEGATED THE TENTATIVE
DECISIONS FOR BAYAMON, CAROLINA, GUAYAMA, AND ARECIBO, PUERTO RICO
AND SAN FRANCISCO, CALIFORNIA TO THE REGIONS. REVISED APPLICATIONS
HAVE SINCE BEEN SUBMITTED TO THE REGIONS BY BAYAMON AND ARECIBO,
PUERTO RICO. GUAYAMA, PUERTO RICO'WITHDREW ITS APPLICATION.
-------
30-
e
20-
10-
301(H) OCEAN DISCHARGE PERMITS
As Of March 31, 1986
1
I
1
\.
>
\
>
V
X
X
X
X
X
X
X
X
x!
X
X
X
*
*
x
X
X.
X
X
X.
X
x
^
X
X
X
X
X
X
X
X
X
X
X
X
X
X
r
?
c
>
*
)
£
$
f
X
X
X
x
X
X
X
X
X
X
X
X
X
\
X
X
1 1 1 1
234
QUARTERS
LEGEND
ACfUAL
INITIAL DECISION TANCCT
PERMIT TARGET
-------
MUNICIPAL PRETREATMENT PROGRAM APPROVALS
o AT THE START OF FY 1986, OW IDENTIFIED 143 MUNICIPALITIES NEEDING
APPROVED PRETREATMENT PROGRAMS. OW PLANS TO APPROVE OR REFER 142 OF
THESE PROGRAMS BY THE END OF THE YEAR. (REGIONS VII, IX AND X DO
NOT HAVE ANY FACILITIES REQUIRING APPROVED PROGRAMS THIS YEAR.)
o EPA AND THE DELEGATED STATES HAVE APPROVED OR REFERRED 87 PROGRAMS
FOR 76% OF THEIR SECOND QUARTER TARGET.
EPA
o NATIONALLY, EPA HAS APPROVED 53 PROGRAMS AND REFERRED 5, ACHIEVING
73% OF ITS SECOND QUARTER TARGET.
- REGIONS III AND V MET OR EXCEEDED THEIR TARGETS.
/
- REGIONS I, II, IV, AND VIII MISSED THEIR TARGETS.
DELEGATED STATES
o NATIONALLY, THE STATES HAVE APPROVED 26 PROGRAMS AND REFERRED 3, '
ACHIEVING 80% OF THEIR SECOND QUARTER TARGET.
- THE STATES IN REGIONS I AND II MET OR EXCEEDED THEIR REGIONAL
TARGETS.
- THE STATES IN REGIONS III, IV AND V MISSED THEIR REGIONAL TARGETS.
-------
to
o
CA-
LL.
O
CD
100-1
80-
60-
40^
20 J
5
o
EPA
PROGRAM APPROVALS
PROGRAM REFERRALS
MUNICIPAL PRETREATMENT
PROGRAM APPROVALS
As Of March 31, 1986
2 3
QUARTERS
53
5
40-
30-
20-
10-
i
4
LEGEND
TARGET
IIIIIIIIIIMII
ACTUAL
STATES
1 2 3
QUARTERS
26
3
i
4
-------
MUNICIPAL PRETREATMENT PROGRAM AUDITS
o AT THE START OF FY 1986, OW AND THE DELEGATED STATES PLANNED TO CONDUCT
318 MUNICIPAL PRETREATMENT PROGRAM AUDITS BY THE END OF THE YEAR.
o EPA AND THE DELEGATED STATES HAVE CONDUCTED 60 AUDITS FOR 81% OF
THEIR SECOND QUARTER TARGET. (NO AUDITS WERE PLANNED FOR OR
CONDUCTED DURING THE. FIRST QUARTER.)
EPA
O NATIONALLY, EPA HAS AUDITED 28 MUNICIPAL PRETREATMENT PROGRAMS,
ACHIEV/NG 85% OF ITS SECOND QUARTER TARGET.
- REGIONS I, IV, V AND VIII MET OR EXCEEDED THEIR TARGETS.
- REGIONS II, VI, VII, IX AND X MISSED THEIR TARGETS.
DELEGATED STATES
O NATIONALLY, THE STATES HAVE AUDITED 32 MUNICIPAL PRETREATMENT PROGRAMS,
ACHIEVING 78% OF THEIR SECOND QUARTER TARGETS.
f
- THE STATES IN REGIONS I, II AND IV MET OR EXCEEDED THEIR
REGIONAL TARGETS.
- THE STATES IN REGIONS V AND VII MISSED THEIR REGIONAL TARGETS..
-------
MUNICIPAL PRETREATMENT AUDITS
As Of March 31, 1986
EPA STATES
MO -i
120-
(/> 10°"
Q
< BO-
li.
0
Lu 60-
m
2
Z 40-
20-
m-\J
04
^
200-
/ 175-
f I/O
t
t
f 150 -
t
/ 125-
t
tf 100-
/
/ 75-
/
,' 50-
/
S 25
F f I \ 1 0-<
1234
f
i
t
»
»
/
/
/
f
»
/
/'
/
/
/
A
1234
QUARTERS QUARTERS
<£>
§. LEGEND
(/> . ACTUAL*
ZE ««
0
-------
MUNICIPAL POLICY IMPLEMENTATION
o THE- INTERIM GOAL OF THE MUNICIPAL POLICY WAS TO PLACE ALL NONCOMPLYING
MUNICIPAL FACILITIES ON ENFORCEABLE SCHEDULES BY THE END OF FY 1985.
NOT HAVING MET THAT GOAL, EPA'S GOAL FOR FY 1986 IS TO PLACE ALL
NONCOMPLYING MAJOR' MUNICIPAL FACILITIES AND SOME OF THE MINORS ON
ENFORCEABLE SCHEDULES.
MAJOR FACILITIES REQUIRING CONSTRUCTION
O OW AJfo THE STATES COMMITTED TO PLACING 441 OF THE 484 NONCOMPLYING
MAJOR MUNICIPAL FACILITIES REQUIRING CONSTRUCTION ON ENFORCEABLE
SCHEDULES WHICH REFLECT MUNICIPAL COMPLIANCE PLANS IN FY 1986.
o NATIONALLY, EPA AND THE STATES HAVE INCORPORATED 184 PLANS INTO
ENFORCEABLE SCHEDULES AND REFERRED 50 NONCOMPLYING FACILITIES TO
JUSTICE, ACHIEVING 115% OF THEIR SECOND QUARTER TARGET:
- REGIONS I, II, IV, VI AND IX ME? OR EXCEEDED THEIR TARGETS.
- REGIONS III, V, VII, VIII AND X MISSED THEIR TARGETS.
MAJOR FACILITIES REQUIRING OPERATION AND MAINTENANCE FIXES
o OW AND THE STATES COMMITTED TO PLACING ALL 56 OF THE NONCOMPLYING
MAJOR MUNICIPAL FACILITIES REQUIRING OPERATION AND MAINTENANCE FIXES
ON ENFORCEABLE SCHEDULES IN FY 1986.
o NATIONALLY, EPA AND THE STATES HAVE PLACED 64 MAJOR FACILITIES ON
ENFORCEABLE SCHEDULES AND REFERRED ONE TO JUSTICE, ACHIEVING 216%
THEIR SECOND QUARTER TARGET. WITH THE EXCEPTION OF REGION V, ALL
REGIONS MET THEIR TARGETS.
-------
1
I
450
400
350
300
250
g 200
.
o
5
m
CD
MUNICIPAL POLICY IMPLEMENTATION
MAJOR FACILITIES
As of March 31,1986
MAJOR FACILITIES MAJOR FACILITIES
REQUIRING CONSTRUCTION ^ REQUIRING 0AM FIXES
60-
50-
40 H
30-
20-
10-
QUARTERS
NUMBER OF FACILITIES
NEEDING ENFORCE-
ABLE SCHEDULES
LEGEND
TARGET
*»*MliM(l*tt
ACTUAl
1 2 3
QUARTERS
56
-------
MUNICIPAL POLICY IMPLEMENTATION
MINOR FACILITIES REQUIRING CONSTRUCTION
O OW AND THE STATES COMMITTED TO PLACING 555 OF THE 3361 NONCOMPLYING
MINOR MUNICIPAL FACILITIES REQUIRING CONSTRUCTION ON ENFORCEABLE
SCHEDULES WHICH REFLECT MUNICIPAL COMPLIAMCE PLANS IN FY 1986.
/
O NATIONALLY, EPA AND THE STATES INCORPORATED 320 PLANS INTO ENFORCEABLE
SCHEDULES AND REFERRED 19 NONCOMPLYING FACILITIES TO JUSTICE, ACHIEVING
134% OF THEIR SECOND QUARTER TARGET. WITH THE EXCEPTION OF REGION
VII, ALL 8 REGIONS SCHEDULED TO INCORPORATE PLANS THIS QUARTER MET OR
EXCEEDED THEIR TARGETS.
MINOR FACILITIES REQUIRING OPERATIONS & MAINTENANCE FIXES
O OW AND THE STATES COMMITTED TO PLACING 76 OF THE NONCOMPLYING MINOR
MUNICIPAL FACILITIES REQUIRING OPERATION AND MAINTENANCE FIXES ON
ENFORCEABLE SCHEDULES IN FY 1986.
O NATIONALLY, EPA AND THE STATES HAVE PLACED 39 MINOR FACILITIES ON
ENFORCEABLE SCHEDULES, ACHIEVING 134% OF THEIR SECOND QUARTER TARGET:
- REGIONS I, TI, III, V, VII AND X MISSED THEIR TARGETS.
- REGION IV HA.; PLACED 18 MINOR FACILITIES ON ENFORCEABLE SCHEDULES
ALTHOUGH Ti WAS NOT SCHEDULED TO DO ANY.
-------
600-1
MUNICIPAL POLICY IMPLEMENTATION
MINOR FACILITIES
As Of March 31, 1986
MINOR FACILITIES MINOR FACILITIES
REQUIRING CONSTRUCTION on REQUIRING O&M FIXES
80 -
1 2 3
QUARTERS
$
NUMBER OF FACILITIES
REQUIRING ENFORCE-
ABLE SCHEDULES
3.361
60-
40-
20-
LEGEND
TARGET
imtitiTiHii
ACTUAL
1 2 3
QUARTERS
-------
CONSTRUCTION GRANTS OUTLAYS
o NATIONALLY, OUTLAYS WERE 106% OF THE SECOND QUARTER COMMITMENT,
EXCEEDING THE EXPECTED RANGE OF -f 5% OF TARGET.
- REGIONS II, III, V, VI, IX AND X ACHIEVED THEIR TARGETS WITHIN THE
WINDOW.
- REGIONS I, IV, VII AND VIII EXCEEDED THE +_ 5% WINDOW FOR THEIR OUTLAY
TARGETS.
-------
C
o
00
3000 -i
2500-
2000-
1500-
o
a 1000
500-
CONSTRUCTION GRANTS NET OUTLAYS
As Of March 31, 1986
QUARTERS
LEGEND
TARGET
ACTUAL
-------
CONSTRUCTION GRANTS BACKLOGGED ADMINISTRATIVE COMPLETIONS
o AT THE BEGINNING OF FY 1986, THERE WERE 767 BACKLOGGED ADMINISTRATIVE
COMPLETIONS. BY THE END OF THE YEAR, EPA AND THE STATES PLAN TO
COMPLETE 397 OR 52% OF THESE.
0 NATIONALLY, OW ACHIEVED 98% OF ITS SECOND QUARTER TARGET FOR BACK-
LOGGED ADMINISTRATIVE COMPLETIONS.
- REGIONS II, III, IV, VI, VII, VIII, IX AND X MET OR EXCEEDED THEIR
TARGETS.
- REGIONS I AND V MISSED THEIR TARGETS.
CONSTRUCTION GRANTS PROJECTS INITIATING OPERATION
0 NATIONALLY, Oi' ACHIEVED 102% OF ITS SECOND QUARTER TARGET FOR PROJECTS
INITIATING OPERATION.
- REGIONS I, II, III, VI, VII, VIII AND X MET OR EXCEEDED THEIR TARGETS
- REGIONS IV, V AND IX MISSED THEIR TARGETS.
-------
400 -
2; 300 -
O
LU
CL
O
O 200
u_
O
(T
LU
oo
3 100^
(O
00
(^
O
CONSTRUCTIONS GRANTS BACKLOGGED ADMINISTRATIVE
COMPLETIONS AND PROJECTS INITIATING OPERATION
As Of March 31, 1986
ADMINISTRATIVE COMPLETIONS
123
QUARTERS
800-1
LEGEND
JMttl.
ACTUAL
PROJECTS INITIATING OPERATION
123
QUARTERS
-------
OPERATIONS MANAGEMENT EVALUATIONS
o IN FY 1986, OW HAS COMMITTED TO CONDUCT 480 OPERATIONS MANAGEMENT
EVALUATIONS (OMEs) OF COMPLETED MINOR MUNICIPAL FACILITIES.
o NATIONALLY, THE REGIONS AND STATES ARE CONDUCTING 353 OMEs THROUGH
THE SECOND QUARTER, ACHIEVING 178% OF THEIR TARGET.
O ALL REGIONS, f7
-------
s-
LJ
to
o
500-1
400-
(Sl
z
O
^3 300
g
L_
O
UJ
CD
200-
100-
Operations Management Evaluations
As of March 31, 1986
QUARTERS
LEGEND
ACTUAL
-------
NPDES COMPLIANCE STATUS
o THIS IS THE FIRST QUARTER THAT REFLECTS THE RESULTS OF THE NEW QNCR
REGULATIONS. FOR MOST REGIONS OVERALL COMPLIANCE RATES TENDED TO
DECREASE AS A RESULT OF A NEW SNC DEFINITION.
o 94% OF THE 3,791 MAJOR INDUSTRIAL FACILITIES HAVE COMPLETED THE
CONSTRUCTION NEEDED TO ACHIEVE FINAL EFFLUENT LIMITS WHILE 6% NEED
ADDITIONAL CONSTRUCTION.
THE OVERALL COMPLIANCE RATE FOR MAJOR INDUSTRIALS DECREASED TO
92% COMPARED TO 95% LAST QUARTER:
- 7% WERE IN SNC WITH FINAL EFFLUENT LIMITS
- 1% WERE IN SNC WITH CONSTRUCTION SCHEDULES/INTERIM EFFLUENT
LIMITS
o 67% OF THE ?.708 MAJOR MUNICIPALS FACILITIES HAVE COMPLETED THE
CONSTRUCTION /REDED TO ACHIEVE FINAL EFFLUENT LIMITS WHILE 33% NEED
ADDITIONAL CONSTRUCTION.
THE OVERALL COMPLIANCE RATE FOR MAJOR MUNICIPALS DECREASED TO
86% COMPARED TO 91% LAST QUARTER:
- 7% WERE IN SNC WITH*FINAL EFFLUENT LIMITS
- 7% WERE IN SNC WITH CONSTRUCTION SCHEDULES/INTERIM' EFFLUENT
LIMITS
NOTES DATA REPRESENTS COMPLIANCE STATUS OF FACILITIES NOT IN
SIGNIFICANT NONCOMPLIANCE AS OF MARCH 31, 1986.
-------
NPDES COMPLIANCE STATUS
As Of March 31,1986
MAJOR INDUSTRIALS
MAJOR MUNICIPALS
«0
$
PERCENT
IX
7X
**
Legend
B3 SNC WITH CS/IEL
SMCWtTHFB.
Z2 NOT IN SNC WTTH
C3 NOT IN SNC WITH TO.
PERCENT
26X
tOX
-------
RESPONDING TO SIGNIFICANT NONCOMPLIANCE
EXCEPTIONS REPORT
O FOR THE EXCEPTIONS REPORT, ONLY 2% OF ALL MAJOR INDUSTRIAL AND
MUNICIPAL FACILITIES ARE IN SNC FOR 2 OR MORE CONSECUTIVE QUARTERS
WITHOUT BEING ADDRESSED OR RETURNED TO COMPLIANCE. THE PENDING
UNADDRESSED BALANCES ARE GREATER FOR MAJOR INDUSTRIALS AND MUNICIPALS
THAN THE PREVIOUS QUARTER'S BALANCE.
- FOR MAJOR INDUSTRIALS ON THE EXCEPTIONS REPORT, 43 FACILITIES
WERE CARRIED OVER FROM THE LAST QUARTER. THE REGIONS HAVE TAKEN
ENFORCEMENT ACTIONS AGAINST 9 OF THEM AND 8 RETURNED TO COMPLIANCE.
THE REMAINING 26 PLUS 34 NEW SIGNIFICANT VIOLATORS ON THE EXCEPTIONS
REPORT CONSTITUTE THE PENDING BALANCE OF 60. THERE ARE 3,791
MAJOR INDUSTRIALS, AND ONLY 2% ARE PENDING ON THE EXCEPTIONS
LIST.
- FOR MAJOR MUNICIPALS ON THE EXCEPTIONS REPORT, 91 FACILITIES WERE
CARRIED OVER FROM THE LAST QUARTER. THE REGIONS HAVE TAKEN
ENFORCEMENT ACTIONS AGAINST 30 OF THEM AND 24 RETURNED TO
COMPLIANCE. THE REMAINING 40 PLUS 62 NEW SIGNIFICANT VIOLATORS
ON THE EXCEPTIONS REPORT CONSTITUTE THE PENDING BALANCE OF 102.
THERE ARE 3,708 MAJOR MUNICIPALS, AND ONLY 3% ARE PENDING ON THE
.EXCEPTIONS REPORT.
-------
I
RESPONSE TO SIGNIFICANT NONCOMPUANCE
EXCEPTIONS REPORT
As Of March 31.1986
MAJOR
INDUSTRIALS
CD
MAJOR
MUNiaPALS
Legend
CD SNC 2 CONSECUTIVE QUARTERS
I SNC FOR MORE THAN 2 CONSECUTIVE QUARTERS
-71-
-------
NPDES ENFORCEMENT ACTIVITY
o NATIONALLY, EPA ISSUED 204 AOs IN THE SECOND QUARTER (486 CUMULATIVE
COMPARED TO 394 CUMULATIVE LAST YEAR). THE STATES ISSUED 642 AOs
COMPARED TO 697 FOR THE SAME QUARTER LAST YEAR.
- REGIONS VI AND X ACCOUNTED FOR 48% AND 16%, OF THE EPA AO's
ISSUED WITH 89 AND 30, RESPECTIVELY.
O NATIONALLY, THE REGIONS REFERRED 21 CASES (43 CUMULATIVE COMPARED TO
35 CUMULATIVE LAST YEAR). DURING THE SECOND QUARTER, THE STATES HAD
54 CIVIL REFERRALS TO THE STATE ATTORNEYS GENERAL COMPARED TO 26
LAST YEAR FOR THE SAME QUARTER. THERE WERE 10 CIVIL REFERRALS AND 1
CRIMINAL REFERRAL FILED IN STATE COURTS.
- REGION V ACCOUNTED FOR 6 REFERRALS AND REGIONS III, VI, IX AND X
EACH HAD 3 REFERRALS.
-------
800
600
o
400-
r>
200-
NPDES ENFORCEMENT ACTIVITY
As Of March 31, 1986
ADMINISTRATIVE ORDERS
1 2 3
QUARTERS
Legend
EPA
E3 STATES
CIVIL REFERRALS
234
QUARTERS
-73-
-------
STATUS OF EPA NPDES ENFORCEMENT ACTIONS
o NATIONALLY, THERE ARE 121 ACTIVE CWA CONSENT DECREES. OF THIS NUMBER
69% (84) ARE IN FULL COMPLIANCE COMPARED TO 73% .IN THE FIRST QUARTER;
28% (34) ARE IN NONCOMPLIANCE WITH ACTION TAKEN OR" PLANNED, AND 3% (3)
ARE IN NONCOMPLIANCE WITH NO ACTION TAKEN OR PLANNED.
O THERE ARE 224 EPA ADMINISTRATIVE ORDERS TO' BE CLOSED OUT THIS FISCAL
YEAR. THE REGIONS SURPASSED THE SECOND QUARTER TARGET OF CLOSING
OUT 99 AOs BY SUCCESSFULLY CLOSING OUT 135.
--7/1-
-------
I
STATUS OF NPDES ENFORCEMENT ACTIONS
(tPA ONLO
As Of March 31,1986
CONSENT DECftCE COMPLIANCE
3.0X
L»g«nd
DB X NON COMPLIANCE, NO ACTION PLANNED
X NON COMPLIANCE. WITH ACTION PLANNED
CD X IN COMPUANCt
AOMMSIlUnVE ORDER
CLOSE OUT
250
200-
BOY
1 2 3
QUARTERS
CD | OF AO* CLOSED OUT
IB fOFAXftOFCN
-------
STATUS OF MAJOR NPDES FEDERAL FACILITIES
o 88% OF THE 154 MAJOR FEDERAL FACILITIES HAVE COMPLETED THE
CONSTRUCTION! NEEDED TO ACHIEVE FINAL EFFLUENT LIMITS WHILE 12% NEED
ADDITIONAL CONSTRUCTION.
o THE OVERALL COMPLIANCE RATE FOR MAJOR FEDERAL FACILITIES DECREASED
FROM 92% IN THE PREVIOUS QUARTER TO 89% THIS QUARTER.
- 7% WERE IN SIGNIFICANT NONCOMPLIANCE WITH FINAL EFFLUENT LIMITS
- 4% WERE IN SIGNIFICANT NONCOMPLIANCE WITH CONSTRUCTION SCHEDULES/
INTERIM EFFLUENT LIMITS
o FOR MAJOR FEDERAL FACILITIES ON THE EXCEPTIONS REPORT, 4 FACILITIES
WERE CARRIED OVER FROM THE LAST QUARTER. THE REGIONS TOOK AN ENFORCE-
MENT ACTION AGAINST 1 OF THEM AND RETURNED 1 TO COMPLIANCE. THE
REMAINING 2 PLUS THE 2 NEW SIGNIFICANT VIOLATORS ON THE EXCEPTIONS
REPORT CONSTITUTE THE PENDING BALANCE OF 4 FACILITIES. THREE PERCENT
OF ALL MAJOR FEDERAL FACILITIES ARE PENDING ON THE EXCEPTIONS REPORT.
-------
I
STATUS OF
MAJOR NPDES FEDERAL FACILITIES
As Of March 31, 1986
COMPLIANCE STATUS
Legend
SNCWfTHFD.
OH SNC WITH
eZ NOT IN SNC WITH CS/IO.
CD NOT IN SNC WfTH FfL
7X
4X
8X
81X
RESPONSE TO NEW VIOLATIONS
DYNAMIC BASE
Legend
CD SNC 2 CONSECUTIVE QUARTOS
i SNC MORE THAN 2 CONSECUTIVE QUARTERS
-77-
-------
NPDES PRETREATMENT ENFORCEMENT ACTIVITY
o THE REGIONS CONDUCTED 121 PRETREATMENT INSPECTIONS AGAINST A TARGET
OF 75 OR 161% OF THE TARGET. THE STATES CONDUCTED 275 INSPECTIONS
COMPARED TO A TARGET OF 270.
- REGION VI ACCOUNTED FOR 53 OR 43% OF THE EPA INSPECTIONS.
O THE REGIONS ISSUED 14 AOs AND REFERRED 6 CASES TO HEADQUARTERS FOR
PRETREATMENT VIOLATIONS. LAST YEAR FOR THE SAME QUARTER THEY ISSUED
16 AOs AND HAD 9 REFERRALS FOR PRETREATMENT VIOLATIONS.
O THE STATES ISSUED 23 AOs AND REFERRED 9 CIVIL CASES TO STATE
ATTORNEYS GENERAL FOR PRETREATMENT VIOLATIONS. LAST YEAR FOR THE
SAME QUARTER THE STATES ISSUED 40 AOs AND HAD 4 REFERRALS FOR
PRETREATMENT VIOLATIONS.
-------
NPDES PRETREATMENT INSPECTIONS
As Of March 31,1986
125+
TARGET
VII VIN IX X
Legend
EPA
E2 STATES
-------
UIC CLASS II PERMIT FILES REVIEWED BY- EPA
o AT THE BEGINNING OF FY 1985, OW PLANNED TO REVIEW 20,237 EXISTING
CLASS II, OIL AND GAS WELL, PERMIT FILES IN A 5-YEAR PERIOD.
o AT THE END OF FY 1985, OW HAD REVIEWED 3,302 FILES, LEAVING 16,935
FOR REVIEW IN THE REMAINING 4 YEARS. OW TARGETED 2,926 FILES
FOR REVIEW IN FY 1986.
o NATIONALLY, EPA HAS REVIEWED 2,316 FILES, ACHIEVING 165% OF ITS SECOND
QUARTER TARGET. All 6 REGIONS SCHEDULED TO REVIEW FILES MET OR
EXCEEDED THEIR TARGETS.
UIC CLASS II PERMIT FILES REVIEWED BY THE PRIMACY STATES
o THE PRIMACY STATES TARGETED 16,232 CLASS II FCLES FOR REVIEW IN FY 1986.
(THIS IS THE FIRST YEAR THAT PRIMACY STATE DATA HAS BEEN TRACKED
QUARTERLY. DATA FOR THIS MEASURE IS LAGGED ONE QUARTER.)
o NATIONALLY, THE PRIMACY STATES HAVE REVIEWED 3,808 FILES, ACHIEVING 127%
OF THEIR FIRST QUARTER TARGET.
- THE STATES IN REGIONS III, V, VI, VII, IX AND X MET OR EXCEEDED
THEIR REGIONAL TARGETS.
- THE STATES IN REGIONS IV AND VIII MISSED THEIR REGIONAL TARGETS.
-------
I
UIC CLASS II PERMIT FILES
As Of March 31, 1986
' EPA STATES
3000-
2500-
{fl 2000-
C
1 i
t_r -
2 eo°-
1
z 1000-
500-
0,
1800O-
*
15750-
/
/ 13500-
X
11250-
/
9000-
/6750-
4500-
2250-
h r» j
p 1 I 1 1 Ol
1234
'
/
/
/
/
»*
*
/
/*'
y^
>>''**
y^
r l i i i
1234
QUARTERS QUARTERS
LEGEND
0> TARGET
**J Illltllllllt*
5-YEAR WORKLOAD: 20,237
AS OF BOY 1985
2
O
-------
QIC PERMIT DETERMINATIONS MADE BY EPA
CLASS r.- DEEP WELLS
o AT THE BEGIMMING OF FY 1985, OW PLANNED TO MAKE PERMIT DETERMINATIONS
FOR 69 EXISTING CLASS I UNDERGROUND INJECTION WELLS OVER A 5-YEAR PERIOD.
o OW MADE DETERMINATIONS FOR 34 EXISTING WELLS IN FY 1985, LEAVING 35
FOR PERMIT DETERMINATIONS IN THE REMAINING 4 YEARS. (OW PLANNED TO MAKE
51 PERMIT DETERMINATIONS FOR NEW AND/OR EXISTING WELLS IN FY 1986.)
o NATIONALLY, EPA HAS MADE 2 DETERMINATIONS, FOR 18% OF ITS SECOND
QUARTER TARGET. BOTH WERE FOR EXISTING WELLS. ALL 3 REGIONS SCHEDULED
TO MAKE DETERMINATIONS MISSED THEIR TARGETS.
PERMIT DETERMINATIONS MADE BY THE PRIMACY STATES
CLASS I - DEEP WELLS
o THE PRIMACY STATES PLANNED TO MAKE 74 PERMIT DETERMINATIONS FOR
NEW AND EXISTING CLASS I WELLS IN FY 1986. (THIS IS THE FIRST YEAR
THAT THE PRIMACY STATES HAVE BEEN TRACKED QUARTERLY. DATA FOR
THIS MEASURE IS LAGGED ONE QUARTER.)
o NATIONALLY, THE PRIMACY STATES HAVE MADE 26 PERMIT DETERMINATIONS,
ACHIEVING 236% OF THEIR FIRST QUARTER TARGET. TWENTY-THREE DETER-
MINATIONS WERE FOR EXISTING WELLS AND 3 WERE FOR NEW WELLS.
- THE STATES IN REGIONS V AND VI MET OR EXCEEDED THEIR
REGIONAL TARGETS.
- THE STATES IN REGION IV MISSED THEIR REGIONAL TARGET. '
-------
0
a:
60-
50-
40-
£ 30
o
e 20
m
10-
CO
UIC
EPA
I PERMIT DETERMINATIONS
(Existing and New)
As of March 31,1986
1234
QUARTERS
5-YEAR WORKLOAD FOR EXISTING WELLS
CLASS 1: 69
80-
60-
40-
20-
LEGEND
STATES
1 2 3
QUARTERS
i
4
-------
QIC PERMIT DETERMINATIONS MADE BY EPA
CLASS II, III AND V WELLS
o AT THE BEGINNING OF FY 1985,'OW PLANNED TO MAKE PERMIT DETERMINATIONS
FOR 1,210 EXISTING CLASS II OIL-AND-GAS-RELATED SALT WATER DISPOSAL
(SWD) WELLS AND 31 CLASS III EXTRACTION WELLS OVER A 5-YEAR PERIOD.
o OW MADE DETERMINATIONS FOR 64 CLASS II AND 8 CLASS III EXISTING
WELLS IN FY 1985, LEAVING 1,146 CLASS II AMD 23 CLASS III WELLS
FOR PERMIT DETERMINATIONS IN THE REMAINING 4 YEARS. OW PLANNED TO
MAKE 609 PERMIT DETERMINATIONS FOR NEW AND EXISTING CLASS II, III
AND V (MISCELLANEOUS) WELLS IN FY 1986.
o NATIONALLY, EPA MADE 364 DETERMINATIONS AGAINST A TARGET OF 237,
ACHIEVING 154% OF ITS SECOND QUARTER TARGET. 99% OF THESE DETER-
MINATIONS WERE FOR CLASS II WELLS. WITH THE EXCEPTION OF REGIONS II
AND VIII, ALL REGIONS MET OR EXCEEDED THEIR TARGETS.
o OF THE 364 DETERMINATIONS MADE:
- 77, OR 21%, WERE FOR EXISTING WELLS. (77 CLASS II)
- 287, OR 79%, WERE FOR NEW WELLS. (362 CLASS II, 1 III, 1 V)
UIC PERMIT DETERMINATIONS MADE BY THE PRIMACY. STATES
CLASS II, III AND V WELLS
o THE PRIMACY STATES PLANNED TO MAKE 6,467 PERMIT DETERMINATIONS FOR
NEW AND EXISTING CLASS II, III AND V WELLS IN FY 1986. (THIS IS
THE FIRST YEAR THAT THE PRIMACY STATES HAVE BEEN TRACKED QUARTERLY.
DATA FOR THIS MEASURE IS LAGGED ONE QUARTER.)
O NATIONALLY, THE PRIMACY STATES HAVE MADE 2,082 PERMIT DETERMINATIONS
AGAINST A TARGET OF 1,125, ACHIEVING 185% OF THEIR FIRST QUARTER
TARGET. 92% OF THESE DETERMINATIONS WERE FOR CLASS II WELLS.
o OF THE 2,082 PERMIT DETERMINATIONS MADE:
- 153, OR 7%, WERE FOR EXISTING WELLS. (66 CLASS II, 20 Ills, 67 Vs)
- 1929, OR 93%, WERE FOR NEW WELLS. (1829 CLASS II, 11 Ills, 89 Vs)
-------
700 -
UIC CLASS II, III AND V PERMIT DETERMINATIONS
(Existing and New)
As of March 31, 1986
6600-
5500 -
4400-
3300-
2200-
1100-
(/}
2
O
1 2
QUARTERS
5-YEAR WORKLOAD FOR EXISTING WELLS
(AS OF BOY 1985)
CLASS II: 1,210
CLASS III: 31
LEGEND
TARGET
ACTUAL
STATES
-------
UIC MECHANICAL INTEGRITY TESTS WITNESSED BY EPA
O AT THE BEGINNING OF FY 1985, OW PLANNED TO WITNESS THE MECHANICAL
INTEGRITY TESTING OF 20,237 EXISTING CLASS II, OIL AND GAS, UNDERGROUND
INJECTION WELLS OVER A 5-YEAR PERIOD.
O OW WITNESSED 3,068 TESTS IN FY 1985, LEAVING 17,168 FOR THE REMAINING
4 YEARS. OW PLANS TO WITNESS.2,467 WELL TESTS IN FY 1986.
o NATIONALLY, EPA HAS WITNESSED THE MECHANICAL INTEGRITY TESTING OF
1,166 WELLS, ACHIEVING 210% OF ITS SECOND QUARTER TARGET. ALL 7
REGIONS SCHEDULED TO WITNESS WELL TESTS MET OR EXCEEDED THEIR TARGETS.
UIC MECHANICAL INTEGRITY TESTING BY THE PRIMACY STATES
O THE PRIMACY STATES PLAN TO WITNESS THE MECHANICAL INTEGRITY TESTING
OF 30,883 EXISTING CLASS II WELLS IN FY 1986. (THIS IS THE FIRST
YEAR THAT PRIMACY STATES HAVE BEEN TRACKED QUARTERLY. DATA FOR THIS
MEASURE IS LAGGED ONE QUARTER.)
o NATIONALLY, THE PRIMACY STATES HAVE WITNESSED THE MECHANICAL INTEGRITY
TESTING OF 6,075 WELLS, ACHIEVING 121% OF THEIR FIRST QUARTER TARGET.
i
- THE STATES IN REGIONS III, V AND IX MET OR EXCEEDED THEIR REGIONAL
TARGETS.
- THE STATES IN REGIONS IV, VI, VII AND VIII MISSED THEIR REGIONAL TARGETS
-------
a:
UJ
2500-
2000-
1500-
1000-
500-
UIC MECHANICAL INTEGRITY TESTS
As Of March 31,1986
EPA
1 2 3
QUARTERS
5-YEAR WORKLOAD: 20.237
AS OF BOY 1985
to
O
32000
28000
24000
20000
16000-
1200CT-
8000-
4000-
LEGEND
ACTUAL
STATES
1 2 3
QUARTERS
-------
POPULATION SERVED BY COMMUNITY PUBLIC WATER SUPPLY SYSTEMS
WITH PERSISTENT VIOLATIONS OF DRINKING WATER STANDARDS
o THE NUMBER OF PEOPLE SERVED BY SYSTEMS IN PERSISTENT VIOLATION (FOUR
OR MORE MONTHS) OF THE MICROBIOLOGICAL STANDARDS HAS DECREASED FROM
5.5 MILLION IN 1981 TO 2.5 MILLION IN 1985.
FOR MICROBIOLOGICAL STANDARDS, THE NUMBER OF PEOPLE EXPOSED TO:
- MAXIMUM CONTAMINANT LEVEL VIOLATIONS INCREASED STEADILY FROM 1981
TO 1985.
- MONITORING AND REPORTING REQUIREMENT VIOLATIONS DECREASED FROM 1981
TO 1984 AND HAS REMAINED CONSTANT IN 1985.
o THE NUMBER OF PEOPLE SERVED BY SYSTEMS IN PERSISTENT VIOLATION OF
THE TURBIDITY STANDARDS HAS DECREASED FROM 5.6 MILLION IN 1981 TO 5.4
MILLION IN 1985.
FOR TURBIDITY STANDARDS, THE NUMBER OF PEOPLE EXPOSED TO:
- MAXIMUM CONTAMINANT LEVEL VIOLATIONS DECREASED FROM 1981 TO 1982,
INCREASED IN 1983 and 1984, AND IN 1985 HAS DROPPED DOWN TO SLIGHTLY
ABOVE 1983 LEVELS.
- MONITORING AND REPORTING REQUIREMENT VIOLATIONS DECREASED FROM 1981
TO 1983 AND STEADILY INCREASED IN 1984 AND 1985.
O APPROXIMATELY 6.5 MILLION PEOPLE WERE SERVED BY SYSTEMS IN PERSISTENT
VIOLATION OF MAXIMUM CONTAMINANT LEVELS OR MONITORING AND REPORTING
REQUIREMENT VIOLATIONS OF THE TRIHALOMETHANE STANDARDS IN 1985 A
SIGNIFICANT INCREASE OVER THE 1.6 MILLION SERVED BY SUCH SYSTEMS IN
1984.
FOR TRIHALOMETHANE STANDARDS, THE NUMBER OF PEOPLE EXPOSED TO:
- MAXIMUM CONTAMINANT LEVEL VIOLATIONS REMAINED THE SAME AT
1.0 MILLION.
- MONITORING AND REPORTING REQUIREMENT VIOLATIONS INCREASED
DRAMATICALLY FROM 0.6 MILLION IN 1984 TO 5.5 MILLION IN 1985.
-------
m
00
2
O
POPULATION SERVED BY WATER SYSTEMS IN PERSISTENT VIOLATION
As Of March 31, 1985
VIOLATING MICROBIAL STANDARDS
82 83 84
FISCAL YEAR
SERVICE POPULATION: 232.8 MILLION
(SURFACE AND GROUND WATER SUPPLY SOURCE)
VIOLATING TURBIDITY STANDARDS
81 82 83 84
FISCAL YEAR
85
SERVICE POPULATION: 163.1 MILLION
(SURFACE WATER SUPPLY SOURCE ONLY)
LEGEND
| MCL VIOLATIONS
0 M/R VIOLATIONS
-------
COMMUNITY SYSTEMS COMPLIANCE STATUS
o NATIONALLY, FOR THE 12 MONTHS ENDING SEPTEMBER 30, 1985, THE PROGRAM
EXCEEDED END-OF-YEAR COMPLIANCE TARGETS FOR MICROBIOLOGICAL AND
TURBIDITY MAXIMUM CONTAMINANT LEVELS (MCLs).
.o ONE PERCENT OF 58,530 COMMUNITY SYSTEMS WERE PERSISTENT VIOLATORS
OF MICROBIOLOGICAL MCL's. THE NATIONAL GOAL IS TO HAVE LESS THAN
1.5% IN PERSISTENT VIOLATION. -SIX PERCENT OF THE 58,530 SYSTEMS WERE
PERSISTENT VIOLATORS OF MICROBIOLOGICAL MONITORING AND REPORTING (M/R)
REQUIREMENTS AGAINST A TARGET OF LESS THAN 6.3%.
o ONLY 2% OF 11,531 COMMUNITY SURFACE SYSTEMS WERE PERSISTENT VIOLATORS
OF TURBIDITY MCLS. THE GOAL IS LESS THAN 4'. 8%.. HOWEVER, 11% OF THE
11,531 SYSTEMS WERE PERSISTENT VIOLATORS OF TURBIDITY M/R REQUIREMENTS
AGAINST A TARGET OF LESS THAN 9.9%.
o FOR TOTAL TRIHALOMETHANE REQUIREMENTS, ONLY 1% OF 3,169 SYSTEMS
WERE PERSISTENT VIOLATORS OF MCLs, AND 3% OF THE 3,169.SYSTEMS WERE
PERSISTENT VIOLATORS OF M/R REQUIREMENTS. !
-------
PUBLIC WATER SUPPLY ENFORCEMENT
COMMUNITY SYSTEMS COMPLIANCE STATUS
As Of September 30, 1985
MICROBIOLOGICAL
MCL
99.0%
M/K
94.0%
I
1.0%
5.0%
TURBIDITY
98.0%
89.0%
L0gend
ISNC
a COMPLIANCE
M/fc
2.0%
11.0%
-------
OFFICE OF SOLID WASTE AND EMERGENCY RESPONSE
_Q }_
-------
OFFICE OF SOLID WASTE AND EMERGENCY RESPONSE
SECOND QUARTER HIGHLIGHTS
o THE RCRA PROGRAM WAS DELEGATED TO EIGHT STATES DURING THE SECOND
QUARTER.
o THE REGIONS COMPLETED 93% OF THE 1456 INITIAL SCREENS OF LAND
DISPOSAL FACILITIES EXPECTED BY JANUARY 31, 1986.
o THE REGIONS EXCEEDED THEIR TARGETS FOR GROUND WATER MONITORING,
BUT ACCOMPLISHED ONLY 59% OF THE CORRECTIVE ACTION TARGET.
o MOST OF THE PUBLIC MOTICES AND FINAL DETERMINATIONS IN THE RCRA
PERMITTING PROCESS. WERE RELATED TO CLOSURE PLANS.
O EPA AND THE STATES ARE AHEAD OF THEIR TARGETS FOR CONDUCTING
INSPECTIONS OF LAND DISPOSAL FACILITIES AND OTHER TSDF's.
o THE RCRA ENFORCEMENT PROGRAM IS SOMEWHAT BEHIND SCHEDULE IN TAKING
INITIAL ACTION AGAINST SNC's. EVEN SO, THERE IS GOOD PROGRESS ON
RETURNING SNC's TO COMPLIANCE.
o THE REGIONS HAVE EXCEEDED THE SECOND QUARTER TARGET FOR SUPERFUND
PRELIMINARY ASSESSMENTS AND SITE . INSPECTIONS .
o OVERALL, S.UPERFUND ENFORCEMENT ACTIVITY LEVELS ARE WELL BELOW THOSE
REPORTED FOR THE SAME TIMEFRAME IN FY 1985.
-------
SUPERFUND ASSESSMENTS AND INSPECTIONS
o THE REGIONS COMPLETED 132% OF THE PRELIMINARY ASSESSMENTS CUMULATIVELY
TARGETED FOR THE SECOND QUARTER. 2386 HAVE BEEN COMPLETED AGAINST A
TARGET OF 1812. REGION II.EXCEEDED THEIR TARGET SHOWING THEIR BEST
PERFORMANCE IN SIX QUARTERS.
o THE REGIONS HAVE EXCEEDED THE SECOND QUARTER CUMULATIVE TARGET FOR
SITE INSPECTIONS BY 26%. 659 HAVE BEEN COMPLETED AGAINST A TARGET
OF 524. ALL REGIONS MET OR EXCEEDED THEIR TARGETS.
SUPERFUND REMOVAL ACTIONS
o THROUGH THE SECOND QUARTER, 17 FIRST TIME REMOVAL ACTIONS HAVE BEEN
STARTED (13 OF THESE WERE FUND-FINANCED AND 4 WERE INITIATED BY
PRP's).
o THROUGH THE SECOND QUARTER, 25 REMOVAL ACTIONS AT NPL SITES HAVE
BEEN COMPLETED (20 OF THESE WERE FUND-FINANCED AND 5 WERE FINANCED
BY PRP'S).
-------
20
9-
SUPERFUND-NPL SITE REMOVAL ACTIONS
As Of March 31. 1986
ACTIONS STARTED
1 2 ~T
QUARTERS
25-1
Legend
SITES STABILIZED
1 2 3
QUARTERS
FUND F1NAMCCD
B21 MP FMANCfD
CUMULATIVE 1AMCT
-------
SUPERFUND REMEDIAL PROGRAM '
DURING FY 1986, SUPERFUND SPMS MEASURES PROGRESS TOWARD COMPLETING
REMEDIAL ACTION AT NPL SITES IRRESPECTIVE OF WHETHER FINANCING IS FROM
THE TRUST FUND OR PRP's. DUE TO LACK OF REAUTHORIZATION, TARGETS FOR
REMEDIAL ACTIVITY MEASURES HAVE NOT BEEN ESTABLISHED. PROGRESS OF FUND
FINANCED ACTIVITIES SINCE THE PROGRAM'S START IS NOTED ON THE GRAPH.
NOTED BELOW IS FY 1986 PROGRESS FOR BOTH PRP AMD FUND FINANCED REMEDIAL
ACTIVITY.
o THERE ARE 850 SITES ON THE NPL. SINCE THE START OF THE PROGRAM,
367 SITES HAVE RECEIVED TRUST FUND MONIES TO INITIATE AND RI/FS.
DURING THE SECOND QUARTER OF FY 1986, NO TRUST FUND MONIES WERE
AVAILABLE TO INITIATE RI/FS ACTIVITY AND 2 RI/FS WERE INITIATED BY
PRP's.
o 117 SITES HAVE HAD ROD's/EDD's SIGNED SINCE THE PROGRAM'S START.
DURING THE SECOND QUARTER 7 ROD's/EDD's WERE SIGNED.
o 33 FUND FINANCED REMEDIAL ACTIONS WERE BEGUN PRIOR TO FY 1986.
NO REMEDIAL CONSTRUCTION ACTIVITY HAS BEEN STARTED THIS YEAR
o PRIOR TO FY 1986, 12 SITES HAD ALL REMEDIAL CONSTRUCTION
ACTIVITY COMPLETED. REMEDIAL ACTION WAS COMPLETED AT ONE SITE
DURING THE SECOND QUARTER.
o SIX SITES HAVE BEEN DELETED FROM THE NPL. NO DELETIONS.HAVE BEEN
INITIATED IN FY 1986.
-------
3
o
SUPERFUND TRUST FUND REMEDIAL ACTIVITY
PROGRAM START THROUGH March 31.1986
350
300
250
200
1
too-I
so
Ri/rs
.81.--*
ROD
2f
BOY |(
1985
, , , ,
3 20 3Q 4Q K) 20
Iftf 1
IS
a
j
0
or
IMS
RA COUPLETE
j ^ o, ^"~~* |
* 1 1 f 1
0 20 5Q 40 10 20
MM
-------
SUPERFUND ENFORCEMENT ACTIVITY
o SECTION 107 COST RECOVERY - THE REGIONS DID NOT MEET THEIR CUMULATIVE
SECOND QUARTER TARGET FOR REFERRING SECTION 107 COST RECOVERY ACTIONS.
FIFTEEN REFERRALS WERE TARGETED' THROUGH THE SECOND QUARTER AND 9 (60%)
HAVE ACTUALLY BEEN REFERRED. NINETEEN SECTION 107 ACTIONS WERE
REFERRED THROUGH THE SECOND QUARTER OF FY 1985.
o SECTION 106 CIVIL REFERRALS DIRECTING PRIVATE PARTY CLEAN UP - THERE
ARE NO REGIONAL TARGETS REQUIRED FOR SECTION 106 REFERRALS. TWO
SECTION 106 REFERRALS WERE MADE DURING THE QUARTER. SECTION 106 WAS
ALSO COMBINED WITH 4 ADDITIONAL REFERRALS UNDER SECTION 107 THAT ARE
COUNTED ABOVE. ONE SECTION 106 REFERRAL WAS MADE THROUGH THE
SECOND QUARTER OF FY 1985.
o FORMAL ADMINISTRATIVE ENFORCEMENT ACTIONS -*OF 16 FORMAL ADMINISTRATIVE
ACTIONS ISSUED DURING THE SECOND QUARTER, 3 WERE FOR NPL SITES (1
REMEDIAL/2 REMOVAL) AND 13 WERE FOR NON-NPL SITES (1 REMEDIAL/12
REMOVAL). FOR THE YEAR, 30 (7 NPL/23 NON-NPL) ADMINISTRATIVE ORDERS
HAVE BEEN ISSUED. THROUGH THE SECOND QUARTER OF FY 1985, 90 (38 NPL/
52 NON-NPL) ADMINISTRATIVE ORDERS WERE ISSUED.
-------
s
40-
30-
gi
Z>
10-
EOTON107COS
CIVIL REFQ
(CUUULA1
A
1 1 1
. 1 2 J
SUPERFUND ENFORCEMENT ACTIVITY
As Of March 31, 1986
TRT
IRA
ITVt
LL
J2
I
i
XmKT CCY
, ^fc."
20-
C-
"^E 10 **
«h
mON 106 CIVIL REFERRALS
QUARTERLY TOTALS
20-
15-
§ 10-
5-
(0) ^
^^H » -
1-UNMAL AUMim^lKAIIVL
ENFORCEMENT ACTIONS
QUARTERLY TOTALS
^
y/ %>
w y/
II
» 4 1234 1234
QUARTERS QUARTERS QUARTERS
-
Legend Legend
m CUMULATIVE TARGET tZt MOH-NFL
i CUMULATIVE ACTUAL NPL
I
-------
RCRA STATE AUTHORIZATION
O EIGHT STATES RECEIVED FINAL PRE-HSWA AUTHORIZATION DURING THE SECOND
QUARTER. THEY ARE:
REGION I - RHODE ISLAND;
REGION III - PENNSYLVANIA;
REGION V - ILLINOIS, INDIANA AND WISCONSIN;
REGION IX - GUAM; AND
REGION X - OREGON AND WASHINGTON.
TWELVE STATES HAVE BEEN AUTHORIZED IN FY 1986 AND 39 STATES ARE NOW
AUTHORIZED TO MANAGE THE PRE-HSWA PROGRAM.
o EIGHT STATES HAVE NO APPLICATION PENDING:
- IOWA'S PHASE I AUTHORIZATION REVERTED.
- IDAHO AND ALASKA INTEND TO ADOPT THE RCRA PROGRAM OVER THE NEXT SEVERAL
YEARS.
- VIRGIN ISLANDS, WYOMING, HAWAII, AMERICAN SAMOA AND THE NORTHERN
MARINAS ISLANDS DO NOT INTEND TO ADOPT THE PRE-HSWA PROGRAM.
-------
§
2
o
DELEGATION STATUS OF RCRA - FINAL AUTHORIZATION
As Of March 31, 1986
LEGEND
| | NONE 8
DRAFT STAGE 9
AUTHORIZED 39
TOTAL 56
III IV V VI VII VIII IX X
REGIONS
-------
RCRA FACILITY MANAGEMENT PLANNING
THE HAZARDOUS AND SOLID WASTE AMENDMENTS OF 1984 REQUIRE EPA AND THE
STATES TO PERMIT ALL ACTIVE LAND DISPOSAL FACILITIES BY NOVEMBER 1988.
IN ADDITION, EPA AND THE STATES MUST REVIEW CLOSURE PLANS AND CLEAN
CLOSURE CERTIFICATIONS FOR ALL LAND DISPOSAL FACILITIES. THIS MEASURE
TRACKS INITIAL SCREENS AND THE IDENTIFICATION OF ENVIRONMENTALLY
SIGNIFICANT LAND DISPOSAL FACILITIES, WHETHER ACTIVE OR CLOSED. ONCE
IDENTIFIED AS ENVIRONMENTALLY SIGNIFICANT, A FACILITY MANAGEMENT PLAN
IS PREPARED TO ENSURE COORDINATION AND JOINT PLANNING BETWEEN STATE AND
REGIONAL PERMITTING, ENFORCEMENT, SUPERFUND AND OTHER APPROPRIATE
PERSONNEL.
o THERE ARE AN ESTIMATED 1456 LAND DISPOSAL FACILITIES WHICH REQUIRED
INITIAL SCREENS BY JANUARY 31, 1986. TO DETERMINE THEIR ENVIRONMENTAL
SIGNIFICANCE. THE REGIONS AND STATES HAVE COMPLETED 1347 INITIAL
SCREENS SINCE THE PROGRAM'S INCEPTION. THIS IS 93% OF THE ESTIMATED
1456 LAND DISPOSAL FACILITIES. 109 FACILITIES REMAIN TO HAVE INITIAL
SCREENS COMPLETED.
o 1192 LAND DISPOSAL FACILITIES, OR 88% OF THOSE INITIALLY SCREENED,
HAVE BEEN DETERMINED TO BE ENVIRONMENTALLY SIGNIFICANT AND WILL REQUIRE
FACILITY MANAGEMENT PLANS BY JULY 31, 1986. 147 FACILITY MANAGEMENT
PLANS HAD BEEN PREPARED AS OF FEBRUARY -28-, 1986.
-------
FACILITY MANAGEMENT PLANNING
As Of February 28, 1986
INITIAL SCREENS*
ENVIRONMENTALLY SIGNIFICANT
LAND DISPOSAL FACILJTIES
1500-1
1000-
500 H
1500-1
1000-
500-
BOY
1
BOY
i
4
(O
Ul
>
O
TARGET
n*«»iftlil*«
ACTUAL
BUaUTY MAMAQCMEMT PLAN COMPUTED
* ALL LAND DISPOSAL FACILITIES ARE
TO BE SCREENED BY 1/3^86
-------
GROUND WATER MONITORING ACTIONS
THIS MEASURE TRACKS PROGRESS TO ESTABLISH GROUND WATER MONITORING
SYSTEMS AT LAND DISPOSAL FACILITIES AND TO SHOW INTERIM PROGRESS
AT THE 496 LAND DISPOSAL FACILITIES EXPECTED TO REQUIRE A PERMIT
BY NOVEMBER 1988.
o THE REGIONS AND STATES ACCOMPLISHED 32 GROUND WATER MONITORING
ACTIONS THROUGH THE SECOND QUARTER EXCEEDING THE TARGET OF 24.
REGIONS II AND III EXCEEDED THEIR TARGET.
- 20 LAND DISPOSAL FACILITIES WERE DETERMINED TO BE IN COMPLIANCE
WITH GROUND WATER MONITORING REQUIREMENTS.
- 9 DETECTION MONITORING PROGRAMS AND 2 COMPLIANCE MONITORING
PROGRAMS WERE DEVELOPED FOR LAND DISPOSAL FACILITIES.
- 1 CORRECTIVE ACTION PROGRAM WAS DEVELOPED.
RCRA CORRECTIVE ACTION ACTIVITIES
THE HAZARDOUS AND SOLID WASTE AMENDMENTS REQUIRE THAT EVERY HAZARDOUS
WASTE FACILITY INVESTIGATE AND, IF NECESSARY, TAKE CORRECTIVE ACTION
AT ALL SOLID WASTE MANAGEMENT UNITS (SWMU'S) AS A CONDITION FOR RECEIVING
A PERMIT. THIS MEASURE TRACKS PROGRESS IN COMPLETING CORRECTIVE ACTION
ACTIVITIES (COMPLETING PRELIMINARY ASSESSMENT/SITE INSPECTION, APPROVING
REMEDFAL INVESTIGATION PLAN, COMPLETING REMEDIAL INVESTIGATION, AND
APPROVING CORRECTIVE MEASURES).
/
o THE REGIONS AND STATES COMPLETED PRELIMINARY ASSESSMENTS/SITE
INSPECTIONS AT 49 LAND DISPOSAL FACILITIES AGAINST A SECOND QUARTER
TARGET OF 80. REGIONS II, TV AND VIII EXCEEDED THEIR TARGET, WHILE
REGIONS I, V, VI AND X DID NOT REACH 50% OF THEIR TARGET.
O 25 PRELIMINARY ASSESSMENTS/SITE INSPECTIONS WERE COMPLETED AT STORAGE
OR TREATMENT FACILITIES.
-------
RCRA GROUND WATER
MONITORING ACTIONS
As of February 28, 1986
CORRECTIVE ACTION FOR
SOLID WASTE MANAGEMENT UNITS
As of February 28, 1986
LAND DISPOSAL
FACILITIES
SWMU's AT OTHER
RCRA FACILITIES
a:
LU
m
120-1
100-
80-
60-
300-i
250-
200-
40-
20-
50-
300-,
250-
200-
150-
100-
50-
IO
00
CO
o
1234
QUARTERS
| TARGET
MONITORING SYS. IN COMPLIANCE
MONITORING PGMS. DEVELOPED
k \J COMPLIANCE PGM. DEVELOPED
CORR. ACTION PGM. DEVELOPED
1234
QUARTERS
LZH
1 T^ 1 1
1234
QUARTERS
TARGET
PA/SI
Rl PLAN APPROVED
Rl COMPLETED
CORRECTIVE MEASURES PGM APPROVED
-------
RCRA PERMITTING
PUBLIC NOTICES
172 PUBLIC NOTICES HAVE BEEN
SECOND QUARTER. 117, OR 68%
HAVE BEEN NOTICES OF CLOSURE
ISSUED IN FY 1986, 134 DURING THE
OF THE PUBLIC NOTICED THIS YEAR
PLAN AVAILABILITY.
- 61 PUBLIC NOTICES HAVE BEEN ISSUED IN FY 1986 FOR LAND DISPOSAL
FACILITIES (OF THESE, 3 DRAFT PERMITS WERE ISSUED, 7 NOTICES OF
INTENT TO DENY WERE ISSUED, AND 51 NOTICES OF CLOSURE PLAN AVAILA-
BILITY WERE ISSUED).
- Ill DRAFT NOTICES HAVE BEEN ISSUED FOR OTHER TSD FACILITIES:
DRAFT PERMIT
INTENT TO DENY
CLOSURE PLAN AVAILABLE
INCINERATOR
3
.1
4
STORAGE/TREATMENT
38
3
62
FINAL DETERMINATIONS
O 84/FINAL DETERMINATIONS HAVE BEEN MADE DURING FY 1986.
OR 76%, WERE APPROVALS OF CLOSURE PLANS.
64 OF THESE,
27 CLOSURE PLANS WERE APPROVED AND 2
FACILITIES.
PERMITS DENIED FOR LAND DISPOSAL
55 FINAL DETERMINATIONS WERE MADE FOR OTHER TSD FACILITIES (OF.
THESE 3 CLOSURE PLANS WERE APPROVED FOR INCINERATORS AND 34
CLOSURE PLANS WERE APPROVED, 16 PERMITS ISSUED, AND 3 PERMITS
DENIED FOR TREATMENT OR STORAGE FACILITIES).
-------
-P"
to
UJ
(/)
o
RCRA PERMITTING
As Of February 28, 1986
PUBLIC NOTICES
FINAL DETERMINATIONS
4 -
OTHER TSD'i
<
o
OTHER rSD'i
1
100
1
150
OTHER TSD'i
LDPi
|
50
I
100
I
150
NUMBER
NUMBER
NOTICE OF DRAFT PERMIT / PERMIT ISSUED
NOTICE OF INTENT TO DEN* / PERMIT DENIED
NOTICE OF CLOSURE PLAN AVAILABIUTV / CLOSURE PLAN APPROVED
NOTE: 496 LDPs need permits by 11/88
-------
RCRA INSPECTIONS OF LAND DISPOSAL FACILITIES
o FOR EPA, THE RCRA ENFORCEMENT PROGRAM EXCEEDED ITS CUMULATIVE
SECOND QUARTER TARGET FOR INSPECTIONS OF LAND DISPOSAL FACILITIES BY
CONDUCTING 130 (176%) INSPECTIONS VERSUS A TARGET OF 74.
o STATES HAVE CONDUCTED 572 (133%) INSPECTIONS OF LAND DISPOSAL
FACILITIES THROUGH THE SECOND QUARTER EXCEEDING A CUMULATIVE TARGET
OF 429.
RCRA INSPECTIONS OF TREATMENT, STORAGE AND DISPOSAL FACILITIES
(OTHER THAN LAND DISPOSAL)
O FOR EPA, THE REGIONS MET THEIR CUMULATIVE SECOND QUARTER TARGET FOR
INSPECTIONS OF TSDF'S BY CONDUCTING 131 (101%) VERSUS A TARGET OF 130.
o THE STATES HAVE CONDUCTED 950 (135%) INSPECTIONS UNDER THIS CATEGORY
VERSUS A CUMULATIVE TARGET OF 702.
-------
RCRA INSPECTIONS UNO DISPOSAL FACILITIES
As Of February 28,1986
I
P
LEVELS
-------
RCRA - PROGRESS ON ADDRESSING LAND DISPOSAL FACILITIES
IN SIGNIFICANT NONCOMPLIANCE
o THE PROGRAM IS BEHIND TARGET FOR ADDRESSING SIGNIFICANT NONCOMPLIERS.
BY THE END OF THE SECOND QUARTER, THE REGIONS AND STATES WERE
TO HAVE ADDRESSED ALL BUT 187 SIGNIFICANT NONCOMPLIERS WITH AT LEAST
AN INITIAL ENFORCEMENT ACTION. AT THE END OF THE QUARTER, 216
SNC'S, 29 MORE THAN PROJECTED, REMAINED WITHOUT AN INITIAL ENFORCEMENT
ACTION.
o THE DISTRIBUTION OF THE 795 SIGNIFICANT NONCOMPLIERS IN THE FIXED
BASE AT THE END OF THE SECOND QUARTER IS AS FOLLOWS:
- 163 (21%) RETURNED TO PHYSICAL COMPLIANCE. ONLY 6% HAD RETURNED
TO COMPLIANCE BY THE END OF THE FIRST QUARTER.
- 216 (27%) ARE UNDER A FINAL, EFFECTIVE ADMINISTRATIVE ORDER,
COURT JUDGMENT OR CONSENT DECREE. TWENTY-FIVE PERCENT WERE UNDER
FINAL ORDERS AT THE END OF THE FIRST QUARTER.
- 200 (25%) HAVE RECEIVED AN INITIAL ADMINISTRATIVE OR JUDICIAL
COMPLAINT. TWENTY-SEVEN PERCENT HAD RECEIVED AN INITIAL COMPLAINT
AT THE END OF THE FIRST QUARTER.
- 216 (27%) ARE PENDING. FORTY-TWO PERCENT WERE PENDING AT THE END
OF THE FIRST QUARTER.
-------
I
RCRA-PROGRESS ON ADDRESSING
LAND DISPOSAL FACILJT1ES IN SIGNIFICANT NONCOMPUANCE
As Of February 28, 1986
Reduction of Fixed Base
(Pending As Of October 1,1985)
~TAROCT
BOY
QUARTERS
Legend
CD RETURNED TO COMPLIANCE
EB ON COMPLIANCE SCHEDULES
EZI INITIAL ENFORCEMENT ACTION TAKEN
1 PENDING
-------
RCRA ENFORCEMENT ACTIVITY-
FORMAL'ADMINISTRATIVE ACTIONS
o THE EPA REGIONS ISSUED 50 FORMAL ADMINISTRATIVE ACTIONS TO TSDF'S
DURING THE SECOND QUARTER. FOR THE YEAR, 77 FORMAL ADMINISTRATIVE
ORDERS HAVE BEEN ISSU'ED TO TSDF'S.
o THE STATES ISSUED 114 FORMAL ADMINISTRATIVE ACTIONS TO TSDF'S DURING
THE SECOND QUARTER. FOR THE YEAR, 153 FORMAL ADMINISTRATIVE ACTIONS
HAVE BEEN ISSUED BY THE STATES TO TSDF'S.
CIVIL REFERRALS
o THE EPA REGIONS REFERRED 11 CIVIL ACTIONS UNDER RCRA DURING THE
SECOND QUARTER BRINGING T.HE TOTAL FOR THE YEAR TO 25. THROUGH THE
SECOND QUARTER OF FY 1985, THE EPA REGIONS REFERRED 5 CIVIL ACTIONS
UNDER RCRA.
o THE STATES FILED 4 CIVIL ACTIONS IN STATE COURTS DURING THE SECOND
QUARTER BRINGING THE TOTAL FOR THE YEAR TO 8. EIGHTEEN CIVIL ACTIONS
WERE FILED THROUGH THE SECOND QUARTER OF FY 1985.
CRIMINAL REFERRALS
o THE EPA REGIONS REFERRED 4 CRIMINAL ACTIONS UNDER RCRA DURING THE
QUARTER BRINGING THE TOTAL FOR THE YEAR TO 7.
o THE STATES HAVE NOT FILED ANY CRIMINAL ACTIONS IN STATE COURTS
THROUGH THE SECOND QUARTER.
-------
RCRA ENFORCEMENT ACTIVITY
As Of February 28,1986
ADMINISTRATIVE COMPLAINTS
ISSUED TO TSDPs
CIVIL REFERRALS
AGAINST TSOPS
-------
RCRA FEDERAL FACILITIES - SNC SNAPSHOT
o TWENTY-TWO FEDERALLY OWNED OR CONTRACTOR OPERATED LAND DISPOSAL
FACILITIES WERE REPORTED AS BEING IN SIGNIFICANT NONCOMPLIANCE AT
THE END OF THE QUARTER (4 ARE FEDERAL LEAD AND 18 ARE STATE LEAD).
OF THESE, 13 (2 FEDERAL LEAD AND 11 STATE LEAD) WERE THE SUBJECT OF
ENFORCEMENT ACTIONS THAT ADDRESSED ALL SIGNIFICANT NONCOMPLIANCE.
IN THE FIRST QUARTER, 38 FEDERALLY OWNED LDF's WERE REPORTED AS
BEING IN SIGNIFICANT NONCOMPLIANCE.
-------
I
RCRA FEDERAL FACILITIES
As Of February 28.1986
PROGRESS AGAINST FEDERAL FACIUTES IN SNC
e
CD
ID
234
QUARTERS
Legend
I § SNC/END OF QUARTER
tZ2 § SNC/ADDRESS./END OF QUARTER
-------
OFFICE OF PESTICIDES AND TOXIC SUBSTANCES
-------
OFFICE OF PESTICIDES AND TOXIC SUBSTANCES
SECOND QUARTER HIGHLIGHTS
o OVERALL OPTS PERFORMED WELL, MEETING MOST OF ITS SECOND QUARTER
COMMITMENTS. HOWEVER, SEVERAL KEY PESTICIDE MEASURES ARE SLIGHTLY
BEHIND SCHEDULE.
o THE PROGRAM EXCEEDED TARGETS FOR REGISTERING NEW ACTIVE PESTICIDE
INGREDIENTS, REVIEWING PESTICIDE STUDIES, COMPLETING EXISTING CHEMICAL
RISK MANAGEMENT ACTIONS AND ABATING ASBESTOS HAZARDS IN SCHOOLS.
o OPTS IS SLIGHTLY BEHIND SCHEDULE IN ESTABLISHING REGISTRATION
STANDARDS, IMPLEMENTING HEALTH AND SAFETY REQUIREMENTS, TAKING
SPECIAL REVIEW ACTIONS AND PROCESSING AMENDED REGISTRATION APPLICATIONS
o THE REGIONS HAVE EXCEEDED COMPLIANCE INSPECTION TARGETS FOR TSCA AND
FIFRA.
O ON THE TSCA SNC FIXED INVENTORY,' THE REGIONS HAVE TAKEN ACTION ON
65% OF PENDING CASES AND CLOSED 42% OF THE TOTAL INVENTORY OF CASES.
o STATES AND REGIONS ARE GENERALLY MEETING TIMEFRAMES FOR ADDRESSING
SIGNIFICANT PESTICIDE VIOLATIONS.
-------
PESTICIDE REGISTRATION STANDARDS
o OPTS ESTABLISHED ONE REGISTRATION STANDARD IN THE SECOND QUARTER.
THIS RAISES THE CUMULATIVE NUMBER OF STANDARDS ESTABLISHED THIS YEAR
TO FIVE AGAINST A TARGET OF ELEVEN.
o THE STANDARD COMPLETED DURING THE SECOND QUARTER, FOR THE PESTICIDE
CAPTAN, COVERS 636 PESTICIDE PRODUCTS.
o SINCE THE PROGRAM WAS ESTABLISHED IN 1980, OPTS HAS ISSUED STANDARDS
COVERING:
- 6,516 PESTICIDE PRODUCTS OUT OF A UNIVERSE OF APPROXIMATELY 45,000.
- APPROXIMATELY 36% OF THE PESTICIDE USAGE (BY VOLUME) IN THE UNITED
STATES.
- 125 PESTICIDE ACTIVE INGREDIENTS OUT OF A TOTAL OF 578.
-------
V)
o
PESTICIDE REGISTRATION STANDARDS
CUMULATIVE NUMBER OF STANDARDS ESTABLISHED
As Of March 31, 1986
301
a
8 20
is H
2 . 3
QUARTERS
LEGEND
(ACTUAL
TARGET
-------
HEALTH AND SAFETY REQUIREMENTS FOR CHEMICALS
COVERED BY REGISTRATION STANDARDS
o THIS MEASURE TRACKS WHETHER THE HEALTH AND SAFETY REQUIREMENTS (HSR)
OF A REGISTRATION STANDARD ISSUED ONE YEAR EARLIER HAVE BEEN IMPLEMENTED,
IT FOCUSES ON WHETHER THE REGISTRANTS OF PESTICIDE PRODUCTS CONTAINING
A REGISTERED ACTIVE INGREDIENT HAVE: '
- AGREED TO SUBMIT ALL HEALTH AND SAFETY STUDIES REQUIRED BY EPA AND
- SUBMITTED AN EPA APPROVED DRAFT LABEL
O OPTS'S OBJECTIVE IS TO INSURE THAT HEALTH AND SAFETY REQUIREMENTS
ARE IMPLEMENTED WITHIN ONE YEAR.
O OPTS HAS IMPLEMENTED 17 HEALTH AND SAFETY REQUIREMENTS SO FAR THIS
YEAR AGAINST A CUMULATIVE TARGET OF 25.
o AT THE CLOSE OF THE SECOND QUARTER, OPTS HAD IMPLEMENTED EIGHT HSRS
FOR CHEMICALS WITHIN THE ONE YEAR OBJECTIVE, AND NINE HSRS FOR OLDER
CHEMICALS. OPTS IS JUST BEGINNING TO UTILIZE ITS SYSTEM FOR ADDRESSING
THESE OLDER CHEMICALS.
-------
00
O
IMPLEMENTATION OF HEALTH AND SAFETY REQUIREMENTS
CUMULATIVE NUMBER ESTABLISHED
As Of March 31, 1986
_
CO
m
LJ
I
Z>
2
O
2 3
QUARTERS
LEGEND
| ACTUAL
Q TARGET
v\>
\\N
\\\'
-------
PESTICIDE SPECIAL REVIEWS
o THE PROGRAM HAS COMPLETED FIVE SPECIAL REVIEW ACTIONS SO FAR
THIS YEAR AGAINST A CUMULATIVE TARGET OF SIX. OPTS MET ITS SECOND
QUARTER TARGET, COMPLETING 2 SPECIAL REVIEW ACTIONS.
o DURING THE SECOND QUARTER THE PROGRAM ISSUED A RISK/BENEFIT ALTERNATIVES
PHASE DOCUMENT (PD 2/3) FOR ADDITIONAL USES OF PENTACHLOROPHENAL (NON-
WOOD) , AND A REVIEW PHASE/ALTERNATIVES PHASE DOCUMENT (PD 1/2/3) FOR
DIAZINON.
O A FINAL DECISION (PD 4) ON CARBON TETRACHLORIDE IS AWAITING THE
SIGNATURE OF THE AA/OPTS.
-------
00
o
PESTICIDE SPECIAL REVIEW ACTIONS
CUMULATIVE NUMBER OF ACTIONS COMPLETED
As Of March 31, 1986
O
o
a:
UJ
LU
o
20-,
s
t
a1 is
10 H
5-
2 3
QUARTERS
LEGEND
|ACTUAL
0 TARGET
-------
PESTICIDE DATA CALL-IN LETTERS
o DURING THE SECOND QUARTER OPTS CALLED IN EXPOSURE DATA ON FIVE
INORGANIC ARSENICAL CHEMICALS CURRENTLY IN SPECIAL REVIEW.
o OPTS ORIGINALLY PLANNED TO CALL IN RESIDUE DATA ON 40 CHEMICALS
IDENTIFIED IN THE 1955 SPRAY RESIDUE HEARINGS. HOWEVER, THE PROGRAM
DELETED 20 CHEMICALS FROM THIS LIST BECAUSE A REGISTRATION STANDARD
ON THE CHEMICAL IS EITHER SCHEDULED OR COMPLETED, OR THE' CHEMICAL HAS
BEEN CANCELLED. THE PROGRAM ADJUSTED ITS TARGET, AND PLANS TO CALL
IN -DATA ON 20 CHEMICALS FROM THE SPRAY RESIDUE HEARINGS AND 5 FROM
SPECIAL REVIEWS.
-------
U)
00
to
O
PESTICIDE DATA CALL-IN LETTERS
CUMULATIVE NUMBER OF FY 1986 LETTERS ISSUED
As Of March 31, 1986
30 n
Q
UJ
D
^ 20
or
UJ
GQ
5
O
10-
2 . 3
QUARTERS
LEGEND
| ACTUAL
QTARGET
-------
REVIEW OF STUDIES
o IN THE SECOND QUARTER OPTS COMPLETED 109 REVIEWS OF STUDIES FROM
CALL-IN DATA, REGISTRATION STANDARDS. OR A NOTICE OF ADVERSE EFFECTS,
BRINGING THE CUMULATIVE TOTAL FOR THE YEAR TO 278. THIS IS
SIGNIFICANTLY AHEAD OF THE SECOND QUARTER CUMULATIVE TARGET OF 210
(32 PERCENT AHEAD OF TARGET).
O IN FY 1985 THE PROGRAM DEVELOPED A MORE STREAMLINED PROCEDURE WHICH
IS ENABLING OPTS TO REALIZE GREATER EFFICIENCY IN REVIEWING STUDIES.
-------
u>
«o
i/t
o
(/I
600-1
REVIEWS OF STUDIES
As Of March 31, 1986
2 . 3
QUARTERS
LEGEND
' | ACTUAL
Q TARGET
-------
PESTICIDE REGISTRATION APPLICATIONS
o OPTS EXCEEDED TARGETS FOR MOST AREAS OF REGISTRATION APPLICATIONS:
NEW ACTIVE INGREDIENTS (10 VS 5), OLD CHEMICALS (360 VS 260) AND NEW
USES (12 VS 11). THE PROGRAM PROCESSED FEWER THAN EXPECTED AMENDED
REGISTRATIONS DUE TO A SHORTAGE OF RECEIPTS.
o THE NUMBER OF OVERDUE ACTIONS INCREASED OVERALL FROM 979 TO 1138.
HOWEVER, IN THE KEY AREAS OF NEW USES AND NEW ACTIVE INGREDIENTS
THE BACKLOG DECREASED.
o THE/NUMBER OF FINAL DECISIONS ON NEW ACTIVE INGREDIENTS is AHEAD OF
TARGET (10 VS 5) DUE TO A CONCERTED EFFORT ON THE PART OF THE PROGRAM
TO PROCESS THESE CHEMICALS IN TIME FOR THE GROWING SEASON.
-------
PESTICIDE REGISTRATION APPLICATIONS
NUMBER OF FINAL DECISIONS
DURING SECOND QUARTER
As Of March 31, 1986
30-,
z
g
(A
Z
FT
20-
OVERDUE ACTIONS *
5-
o
iSOO-i
1250-
1000-
750-
500-
250-
1200-
900-
i
600-
300-
85 1 2 3 4
QUARTERS
LEGEND
|ACTUAL
QTARGET
* 0*«r 95 percent of ov«rdu« action* wer« in amended regittrationt
and old chemicali, areas which OPTS considers !( urgent than
ne* uses or active ingredients
-------
EMERGENCY EXEMPTIONS FOR PESTICIDES
O DURING THE SECOND QUARTER OPTS EXCEEDED ITS TARGET OF MAKING 30
FINAL DECISIONS ON EMERGENCY EXEMPTIONS, .COMPLETING 33.
o OF THE APPLICATIONS PROCESSED, 19 WERE ISSUED AND 14 DENIED.
/
o THEX BACKLOG INCREASED FROM ONE TO THIRTEEN DURING THE SECOND QUARTER.
O THE PROGRAM NOTES THAT A MID-YEAR BACKLOG INCREASE IS NOT UNUSUAL,
AND IT FORSEES NO DIFFICULTY IN REDUCING THE BACKLOG BY THE END OF THE
FISCAL YEAR.
-------
PESTICIDE TOLERANCE PETITIONS
o OPTS MADE 15 FINAL DECISIONS ON TOLERANCE PETITIONS, EXCEEDING THE
SECOND QUARTER TARGET OF 13.
O THE BACKLOG OF ACTIONS LEADING TO FINAL DECISIONS ROSE FROM 52 AT
THE END OF THE FIRST QUARTER TO 73. THIS INCREASE IS DUE IN PART TO
PETITIONS COMING IN SUBSTANTIALLY AHEAD OF PROJECTIONS.
O THIS MEASURE HAS BEEN REVISED TO PLACE EMPHASIS ON FINAL, RATHER
THAN INTERMEDIATE DECISIONS.
-------
TSCA EXISTING CHEMICAL REVIEWS
o OPTS IS AHEAD OF ITS SECOND QUARTER CUMULATIVE TARGET, COMPLETING
NINE RISK MANAGEMENT ACTIONS AGAINST A TARGET OF SEVEN.
o THE FIVE RISK MANAGEMENT ACTIONS COMPLETED THIS QUARTER INCLUDE A
NOTICE OF PROPOSED RULEMAKING ON ACTIONS CONCERNING ASBESTOS, A
SECTION 9 REFERRAL TO OSHA FOR FORMALDEHYDE, AND THREE SIGNIFICANT
NEW USE RULES (TWO FINAL AND ONE PROPOSED).
/
o THER'E ARE APPROXIMATELY eo,ooo EXISTING CHEMICALS ON THE TSCA INVENTORY,
OPTS ANNUALLY RECEIVES ABOUT 500 REPORTS ON 100 CHEMICALS NOTIFYING
THE AGENCY OF A POTENTIAL RISK. AFTER SCREENINGS CHEMICALS OF
CONCERN ENTER THE EXISTING CHEMICALS PIPELINE. TO DATE THE PROGRAM
HAS SCREENED 3,200 CHEMICALS. THERE ARE CURRENTLY 73 CHEMICALS IN-
THE PIPELINE. THE PROGRAM HAS TAKEN 27 FINAL ACTIONS* ON 15 CHEMICALS
(11 OF THESE ACTIONS WERE ON PCB'S).
*A final action is an FRM, Section 9 referral or a chemical advisory.
-------
DISPOSITION OF CHEMICALS IN THE
EXISTING CHEMICALS PIPELINE
RISK IDENTIFICATION PHASE
NUMBER OF CHEMICALS
IN THIS PHASE AT BEGINNING OF QUARTER
ENTERED DURING THE QUARTER
REFFERED TO NEXT PHASE
REQUIRING NO FURTHER ANALYSIS
REQUIRING FURTHER ANALYSIS
41
1
0
3
39
RISK EVALUATION PHASE
NUMBER OF CHEMICALS
IN THIS PHASE AT BEGINNING OF QUARTER
ENTERED DURING THE QUARTER
REFFERED TO NEXT PHASE
REQUIRING NO FURTHER ANALYSIS
REQUIRING FURTHER ANALYSIS
16
15
RISK MANAGEMENT PHASE
IN THIS PHASE AT BEGINNING OF QUARTER
ENTERED DURING THE QUARTER
CUMULATIVE TARGET
CUMULATIVE RISK MANAGEMENT ACTIONS
16
1
7
9
Risk Identification Phase
Entry Review, Problem
Characterization
Risk Evaluation Phase
Info. Gathering and Risk
Analysis
Risk Management Phase
Risk Reduction Analysis
Risk Management Actions
-------
-------
TSCA NEW CHEMICAL REVIEWS
o OPTS MANAGED TO KEEP PACE WITH DEMAND IN NEW CHEMICAL NOTICES,
RECEIVING 531 IN THE SECOND QUARTER, AND PROCESSING 505.
o THE MAJORITY OF THESE WERE PRE-MANUFACTURE NOTICES, OF WHICH:
- 149 RESULTED IN THE CHEMICAL BEING SUSPENDED, WITHDRAWN, OR
SUBJECTED TO AN EPA ORDER;
- 31 WERE REFERRED FOR FOLLOW-UP;
- 313 REQUIRED NO FURTHER ACTION.
o THE NUMBER OF NEW CHEMICAL NOTICES RECEIVED BY EPA HAS RISEN
SUBSTANTIALLY, AND COULD SURPASS 2,000 FOR THE YEAR.
o AS OF THE END OF THE SECOND QUARTER, OPTS HAS COMPLETED EIGHT NEW
CHEMICAL FOLLOW-UP ACTIONS, ALL PROPOSED SIGNIFICANT NEW USE RULES,
OPTS PLANS TO COMPLETE 22 BY THE END OF THE YEAR.
INT'ERAGENCY TESTING COMMITTEE
o THE PROGRAM IS AHEAD OF SCHEDULE ON POST INITIAL ITC RESPONSE
DECISIONS, COMPLETING 15 SO FAR THIS YEAR AGAINST A TARGET OF 10.
-------
ASBESTOS ACTION PROGRAM
/
ASBESTOS SCHOOL HAZARD ABATEMENT ACT
o THE ASBESTOS ACTION PROGRAM PERFORMED OUTSTANDINGLY, EXCEEDING
TARGETS IN TWO KEY AREAS:
- THE REGIONS CONDUCTED 87 PROJECT CLOSE-OUT EVALUATIONS TO CONFIRM
THAT ABATEMENT WAS/IS BEING ACCOMPLISHED. ONLY 23 WERE TARGETED
(SEE GRAPH).
o THE REGIONS WERE ALSO ABLE TO REDUCE THE ASBESTOS HAZARD AT 181 HIGH
PRIORITY PROJECTS WHICH EPA WAS NOT ABLE TO FUND THROUGH ASHAA.
THIS ALREADY EXCEEDS THE ANNUAL CUMULATIVE TARGET OF 157. (ONLY 63
WERE COMMITTED TO THROUGH THE SECOND QUARTER).
o NO GRANTS TO STATE PROGRAMS FOR CONTRACTOR TRAINING AND CERTIFICATION
WERE MADE, ALTHOUGH TWO WERE TARGETED. EXTERNAL CIRCUMSTANCES (I.E.,
STATE FAILED rO ENACT ENABLING LEGISLATION) WERE RESPONSIBLE. THE
PROGRAM EXPECTS TO MEET ITS THIRD QUARTER TARGETS.
-------
(/)
o
£
o
(/)
o 10-
o
S
m
2
:o
5-
«o
Ul
(ft
O
ASBESTOS ACTION PROGRAM
Evaluations Confirming Abatement at School Projects
As of March 31, 1986
ti
IV V VI
REGIONS
VII VIII IX
2000-1
1500-
1000-
50O-
UNIVERSE OF KEY
ASBESTOS HAZARD PROJECTS
KCY ASKSTOS HAZAM HKUCCTS
niMOCD ASHAA PtOJCCT*
HA1WK) MOUCCt V/0 ASHAA TONOINQ
TAROET
ACTUAL
-141-
-------
REGIONAL AND HEADQUARTERS TSCA INSPECTIONS AND COMPLIANCE LEVELS
O THE REGIONS AND HEADQUARTERS EXCEEDED (137%) THEIR COMBINED SECOND
QUARTER TARGET FOR TSCA COMPLIANCE INSPECTIONS, CONDUCTING 2,816
INSPECTIONS VERSUS A TARGET OF 2,052. NINE REGIONS AND HEADQUARTERS
EXCEEDED THEIR TARGETS BY 25% OR MORE.
o OF THE 2,816 INSPECTIONS:
- 36% WERE IN COMPLIANCE
- 25% WERE IN VIOLATION (14% WITH ENFORCEMENT ACTION TAKEN;
11% WITH ENFORCEMENT ACTION PENDING)
- 39% WERE PENDING A COMPLIANCE DETERMINATION (14% LESS THAN AT
THE CLOSE OF THE LAST QUARTER)
o OF THE 1,734 INSPECTIONS FOR WHICH A COMPLIANCE DETERMINATION WAS
MADE BY THE Li T OF THE QUARTER, 58% WERE IN COMPLIANCE, AND 23% WERE
IN VIOLATION WlCH ACTION TAKEN. A YEAR AGO, THE COMPARABLE
COMPLIANCE R-\TE WAS 55%.
-------
TSCA INSPECTION AND COMPLIANCE LEVELS
As Of March 31,1986
tasT
Compllano* Status
2.8W
1« BiVtOUnOM^ ACTION PCNOMO
WX CJ VIOLATION ^ ACTION ttttN
MX ta coMTUAita ommnNAiiON PCNDNW
MX OMOOMTUANCC
I II III IV V
VII VII IX X HQ
-1
-------
RESPONSE TO TSCA SIGNIFICANT NONCOMPLIANCE
o THE REGIONS HAD A BEGINNING-OF-YEAR INVENTORY OF 782 TSCA
SIGNIFICANT NONCOMPLIER CASES, MADE UP OF 488 OPEN CASES AND 294
CASES PENDING ENFORCEMENT ACTIONS. THE REGIONS WERE ABLE TO TAKE
ACTION ON 191 (65%) OF THE PENDING CASES BY THE END OF THE SECOND
QUARTER, AT THE BEGINNING OF YE^R, 28% OF THE CASES HAD BEEN OPEN
SIX MONTHS OR MORE; THIS PROPORTION HAS REMAINED AT 26% IN THE FIRST
AND SECOND QUARTERS. THE REGIONS CONTINUED TO CLOSE CASES AT A HIGH
RATE, CLOSING 179 CASES IN THE SECOND QUARTER, FOR A TOTAL OF 326
FOR THE YEAR TO DATE.
- REGIONS IV, VI AND IX WERE SUCCESSFUL IN OPENING ALL OF THEIR
PENDING CASES.
O THE REGIONS IDh !TIFIED 356 NEW SIGNIFICANT VIOLATIONS IN THE FIRST
AND SECOND QU^XTERS. OF THESE, 242 (68%) WERE PENDING AN ENFORCEMENT
ACTION, 114 (32%) HAD BEEN ISSUED. ADMINISTRATIVE COMPLAINTS, AND 6
OF THESE 114 CASES WERE CLOSED. . A YEAR AGO, 394 SNC VIOLATIONS HAD
BEEN DETECTED, 186 (47%) HAD COMPLAINTS ISSUED AND 9 WERE CLOSED.
o A TOTAL OF 4 TSCA CIVIL CASES HAVE BEEN REFERRED TO HEADQUARTERS BY
REGIONS IV, V AND VIII. REGION III REFERRED ONE. TSCA CRIMINAL CASE
THIS QUARTER.
-------
00
00
O 4OO-
200-
I
RESPONSE TO TSCA SIGNIFICANT NONCOMPUANCE
As Of March 31, 1986
PROGRESS AGAINST FIXED BASE
CD PRE 86 CLOSED
D OPEN MORE THAN MONTHS
EZ) OPEN 6 MONTHS OR LESS
H PENDING ENFORCEMENT ACTION
400-i
PROGRESS AGAINST
NEW VIOLATORS
-------
RESPONSE TO TSCA SIGNIFICANT NONCOMPLIANCE IN FEDERAL FACILITIES
o THE BEGINNING OF YEAR INVENTORY OF 19 TSCA FEDERAL FACILITY SNC CASES
WAS AMENDED TO SHOW A TOTAL OF 22 CASES, MADE UP OF 12 CASES PENDING
ENFORCEMENT ACTION AND TEN CASES OPEN SIX MONTHS OR LESS. AT THE
END OF THE SECOND QUARTER, ACTION HAD BEEN TAKEN AGAINST ALL 12
PENDING CASE!;' NINE CASES HAD BEEN CLOSED, AND 13 CASES HAD BEEN
OPEN SIX MONTHS OR LESS.
o TO DATE, THE REGIONS HAVE IDENTIFIED 21 NEW SIGNIFICANT VIOLATORS
IN FEDERAL FACILITIES. AT THE END OF THE QUARTER, 13 CASES WERE
PENDING ENFORCEMENT ACTION AND EIGHT HAD ACTION TAKEN.
-------
RESPONSE TO TSCA SIGNIFICANT NONCOMPUANCE
IN FEDERAL FACILITIES
As Of March 31, 1986
PROGRESS AGAINST FIXED BASE
BOY
03 04
Legend
CD PRE 88 CLOSED
K2 OPEN MORE THAN 8 MONTHS
EZl OPEN 8 MONTHS OR LESS
I PENDING ENFORCEMENT ACTION
PROGRESS AGAINST
NEW VIOLATORS
-------
FIFRA COMPLIANCE MONITORING INSPECTIONS AND COMPLIANCE LEVELS
o IN THE FIRST QUARTER OF FY 1986*, THE STATES COMPLETED 6,033 FIFRA
COMPLIANCE INSPECTIONS FOR USE AND RESTRICTED USE PESTICIDE DEALERS,
COMPLETING 153% OF THEIR TARGETS IN STATE GRANTS. ALL REGIONS
ACHIEVED 90% OR MORE OF TARGETS. REGIONS VII AND VIII, WITH NON-
DELEGATED PRO 'RAMS, ALSO EXCEEDED EPA TARGETS IN THE SAME CATEGORIES,
CONDUCTING 142 INSPECTIONS.
O THE STATES REPORTED TAKING 1,373 ENFORCEMENT ACTIONS IN THE FIRST
QUARTER, REPRESENTING A VIOLATION LEVEL OF 23% FOR "USE" INSPECTIONS.
THIS RATE IS HIGHER THAN LAST YEAR'S RANGE (15%-17%), IN- PART
BECAUSE SOME ACTIONS TAKEN IN THIS QUARTER RESULTED FROM INSPECTIONS
REPORTED PREVIOUSLY. IN ADDITION, THIS QUARTER'S RATE IS BASED ON
"USE" INSPECTIONS AND ACTIONS ONLY, RATHER THAN ALL 'CATEGORIES
REPORTED LAST YEAR. THIS NEW RATE WILL BE MONITORED OVER THE YEAR.
*STATE DATA IS LAGGED ONE QUARTER.
-------
I
£
3
F1FRA COMPLIANCE MONITORING INSPECTIONS AND COMPLIANCE LEVELS
FOR STATE ACTIVITIES
As Of December 31,1985
-usr* MsrccnoM LEVELS
05+
TAITOET
.ITS
"USE" INSKCnOMS
CONDUCTED
L*g«nd
77% CUNOACHONWAMMNTED
OH COMFUOMCI
onSBtunw PCHDWO
HEWC
VII VIII IX X
-------
ADDRESSING FIFRA SIGNIFICANT NONCOMPLIANCE
o THE STATES HAVE RESPONDED TO ALL BUT 8% OF SIGNIFICANT PESTICIDE
"USE" VIOLATTJNS (§27 REFERRALS) WITHIN AGREED-UPON TIMEFRAMES.
o THE REGIONS HAVE REFERRED'A TOTA'L OF 96 SIGNIFICANT USE VIOLATIONS
TO STATES FOR INVESTIGATION AND ENFORCEMENT ACTION WITHFN AGREED
UPON TIMEFRAMES. AT THE END OF THE SECOND QUARTER:
- 8(8%) WERE ADDRESSED BEYOND THE TIMEFRAME '
- 47 (49%) WERE PENDING ACTION WITHIN THE TIMEFRAME
- 41 (43%) WERE ADDRESSED WITHIN THE TIMEFRAME
O TO DATE, FIVE REGIONS RECEIVED A TOTAL OF 32 SIGNIFICANT VIOLATION
CASES FROM STATES (17 OF THESE CASES WERE IN REGION IV). OF THE
TOTAL, 20 WERE ADDRESSED WITHIN TIMEFRAMES AND 12 CASES WERE PENDING
ENFORCEMENT ACTION WHILE WITHIN TIME LIMITS.
-------
ADDRESSING FIFRA SIGNIFICANT NONCOMPLJANCE
As Of March 31, 1986
SECTION 27 REFERRALS TO STATES
too
t 2 3
QUARTERS
a
cc
EPA USE CASES - REFERRALS FROM STATES
40-
|
30-
20-
10
O
Legend
2 3
QUARTERS
i NOT ADDRESSED BEYOND T1MCFRAMC
d ADDRESSED BEYOND TMEFHAME
ZZ> PENDING WITHIN TIMEFRAME
(=) ADDRESSED WITHIN TIMEFRAME
-------
OFFICE OF ENFORCEMENT AND COMPLIANCE MONITORING
-------
CIVIL ACTION PROCESSING TIME
O OECM REVIEWED AND FORWARDED 41 CIVIL REFERRALS TO THE DEPARTMENT
OF JUSTICE DURING THE SECOND QUARTER COMPARED TO 85 CASES IN THE
PREVIOUS QUARTER.
O THE AVERAGE TARGETED REVIEW TIME OF 35 DAYS WAS MET.
REGIONAL REFERRAL ACTIVITY
O REGIONS MADE 56 NEW CIVIL REFERRALS TO HEADQUARTERS AND 16 DIRECT
REFERRALS TO THE DEPARTMENT OF JUSTICE DURING THE SECOND QUARTER,
COMPARED TO 45 AMD 19 RESPECTIVELY DURING THE FIRST QUARTER.
O REGIONS REFERRED 8 NEW CRIMINAL CASES TO HEADQUARTERS DURING THE
SECOND QUARTER COMPARED TO 9 IN THE FIRST QUARTER.
-------
PROGRESS IN CONCLUDING CIVIL CASES
As Of March 31.1986
CONCLUSION OF CIVIL CASES
PENDING AS OF OCTOBER 1,1985
BOY
L£GD4D
1 2
QUARTERS
S3
CO CAM* flU» IN OOtllT
CAMS imOHAWN / DKUND
CAM* CCMOIH* AT OOJ
8
CONCLUSIONS OF NEW FY 1986
REFERRALS TO DOJ
-------
CONCLUSION OF CIVIL CASES
9
STATUS AS OF 3/31/86
o 441 CIVIL CASES WERE PENDING AT THE DEPARTMENT OF JUSTICE OR FILED
IN COURT AS OP OCTOBER 1, 1985. (123 OF THESE CASES HAVE BEEN
ON-GOING MORE THAN TWO YEARS SINCE BEING. FILED.) TO DATE THIS FISCAL
YEAR :
- 6 OF THESE CASES HAVE BEEN WITHDRAWN/DECLrNED BY EPA OR
THE DEPARTMENT OF JUSTICE.
- 338 OF THESE CASES ARE NOW FILED IN U.S. COURT.
- 61 OF THESE CASES HAVE BEEN CONCLUDED AFTER FILING.
- 36 OF THESE CASES ARE STILL PENDING AT THE DEPARTMENT OF JUSTICE.
O 170 NEW CIVIL CASES HAVE BEEN REFERRED TO THE DEPARTMENT OF
JUSTICE DURING FISCAL YEAR 19R6. TO DATE:
- 54 OF THESE CASES HAVE BEEN FILED IN U.S. COURT.
- 116 OF THESE CASES ARE PENDING AT THE DEPARTMENT OF JUSTICE.
- NO CASES HAVE BEEN CONCLUDED.
-------
/'
CONSENT DECREE TRACKING (EPA DECREES ONLY)
As Of March 31, 1986
CO-
10O-
v> 80-
t>
0
% 60-
*
E
U
z 40-
20-
~| '
tO . »
f C
* K
2
o
\ V
\\
^
^0
1
\x
. V1
^
^
N\
g
II
*
V
\ \
Ste
OO<
III
^
s\
^
vV
IV
MO-
JOO-
^
s^
^
^
^
\x
s \S
vX N
NX
\ \
^
V
Vs
i
2*°"
1 200-
0
i.
$ tM-
100-
M-
National Summary
BS
^s
\ V
^
s 5
V ^
JsA/ KJO?
^ 5§§
HHH IgBI
Q 1 I 1 1 1 1
1 2 3 4
,N^ UUAKItKb
NX 1 - ~ X N _, .
^J N\N \X r^ ^NX
I^^^i
11,.. ,---. M^M. ,IM,M. ..., . .-p.. ,
V VI VII VIII IX X
^N. X^j In oompllanoo with tho torms ot tho dooroo
2S^y In violation with formal onforoomont action InHtatod
HB 1° violation with formal onforoomont action planned but unoonvnonood
In violation with no forme
il onforoomont action ptannod at thto tkno
-------
CONSENT DECREE TRACKING
o THE NUMBER OF REPORTED ACTIVE CONSENT DECREES HAS STEADILY INCREASED
FROM 211 IN FIRST QUARTER OF FY 1985 TO 311 IN SECOND QUARTER OF
FY 1986. COMPLIANCE HAS INCREASED FROM 61% TO 78%.
o OF THE 311 ACTIVE DECREES, 241 (78%) WERE REPORTED IN COMPLIANCE AND
70 (22%) WERE REPORTED IN VIOLATION.
o OF THE 70 IN VIOLATORS:
- 49 (70%) HAVE HAD A CONTEMPT ACTION OR A DECREE MODIFICATION
REFERRED OR A STIPULATED PENALTY COLLECTED.
- 14 (20%) HAVE HAD FORMAL ENFORCEMENT ACTION PLANNED BUT NOT
COMMENCED.
- 7 (10%) HAVE NO FORMAL ENFORCEMENT ACTION PLANNED AT THIS TIME.
-------
OFFICE OF RESEARCH AND DEVELOPMENT
-------
ATS HIGHLIGHTS
o OF THE 18 RESEARCH PROJECTS SCHEDULED FOR COMPLETION DURING THE
SECOND QUARTER, ORD COMPLETED 15 ON OR AHEAD OF SCHEDULE.
/
o 3 RESEARCH PROJECTS WERE DELAYED:
- THE NATIONAL SURFACE WATER SURVEY WAS FORWARDED TO THE
ADMINISTRATOR AFTER ONE MONTH'S DELAY IN ORDER TO RESPOND
TO PEER-REVIEW RECOMMENDATIONS.
THE ACID DEPOSITION DENDROECOLOGICAL ANALYSIS IS STILL UNDER-
GOING ORD HEADQUARTERS ADMINISTRATIVE AND POLICY REVIEW.
- THE CARCINOGEN RISK ASSESSMENT NEEDS WORKSHOP WAS RESCHEDULED
FOR MID-SUMMER. *
-------
OFFICE OF ADMINISTRATION AND RESOURCES MANAGEMENT /
-------
GRANTS SERVICE STANDARDS
o THE GRANTS ADMINISTRATION DIVISION'S SECOND QUARTER WORKLOAD HAS
EXCEEDED THAT OF THE PAST SIX QUARTERS. PERFORMANCE REMAINS STEADY.
o 93% OF THE GRANTS AND COOPERATIVE AGREEMENTS IN THE SECOND QUARTER
WERE AWARDED WITHIN THE TARGET OF 18 DAYS PER ACTION. PERFORMANCE
IMPROVED SLIGHTLY FROM THE SECOND QUARTER FY 1985.
O 85% OF THE INTERAGENCY AGREEMENTS IN THE SECOND QUARTER MET THE
DEADLINE. OF 18 DAYS_ PER ACTION. TIMELINESS OF THESE ACTIONS HAS
MUCH IMPROVED FROM THE SECOND QUARTER FY 1985.
o 96% OF THE SECOND QUARTER'S 57 DETERMINATIONS FOR REQUESTS FOR
DEVIATION FROM REGULATORY REQUIREMENTS WENT THROUGH WITHIN THE
15-DAY LIMIT. WORKLOAD WAS HIGH BECAUSE 41 STATES RECEIVED DEVIATIONS
RELATED TO THE UNDERGROUND STORAGE TANKS PROGRAM. PERFORMANCE HAS
IMPROVED BY 20% FROM SECOND QUARTER FY 19R5.
o ALL BUT 3 OF THE QUARTER'S 58 DETERMINATIONS IN SUSPENSION/DEBARMENT
CASES WERE WITHIN THE TARGET. WORKLOAD FOR SUCH DETERMINATIONS IS
OVER 10 TIMES THAT OF SECOND QUARTER FY 1985. AS THE AGENCY BECOMES MORE
AWARE OF THE SUSPENSION/DEBARMENT PROGRAM, OARM EXPECTS THE CASELOAD
TO CONTINUE AT THIS HIGHER LEVEL.
-------
s
m
2
ZJ
-z.
250-i
200-
150-
100-
50-
0-
ID
GRANTS SERVICE STANDARDS
NUMBER OF ACTIONS COMPLETED DURING QUARTER
As Of March 31, 1986
GRANT OR COOPERATIVE
AGREEMENT AWARDED
1NTERAGENCY AGREEMENT
AWARDED AFTER RECEIPT
2 3
QUARTERS
234
QUARTERS
LEGEND
ACDOmCOMPUTDICYONOTAMCT
ACTION* COMPUTED VITMIN UftQCT
a:
LJ
CD
60-,
46-
30-
DETERMINATION PREPARED FOR
DEVIATION FROM REGULATORY
REQUIREMENTS
SUSPENSION/DEBARMENT /
DETERMINATION ISSUED AFTER
CASE RECORD COMPLETE
or
UJ
m
60-i
45-
30-
1234
QUARTERS
1234
QUARTERS
-------
PROCUREMENT SERVICE STANDARDS
o DURING THE SECOND QUARTER, OARM AV-JARDED 40% OF EPA'S MAJOR NEGOTIATED
CONTRACTS WITHIN THE PROCESSING TIME TARGET. THIS PERFORMANCE
REFLECTS A CONSIDERABLE DROP FROM 72% ON TIME IN THE FIRST QUARTER.
AS IT DID LAST YEAR, WORKLOAD INCREASED ABOUT 10% FROM FIRST TO
SECOND QUARTER.
- ONLY 12 OF THE 27 NEW COMPETITIVE CONTRACTS WERE AWARDED WITHIN
THE STANDARD SCHEDULE OF 225 TO 240 DAYS OR WITHIN A NEGOTIATED
SCHEDULE. SEVEN OF THE 15 LATE CONTRACTS WERE DELAYED WITHIN OARM.
- ONLY 5 OF THE 16 NEW SOLE SOURCE CONTRACTS WERE AWARDED WITHIN
THE LIMIT OF 171 DAYS. SIX OF THE 11 LATE CONTRACTS WERE HELD UP
IN OARM.
o PROCUREMENT HAS ISSUED 25% FEWER SOLE SOURCE CONTRACTS YEAR-TO-DATE
THAN IN THE SECOND QUARTER FY 19«5, AND EXPECTS THE VOLUME OF SOLE SOURCE
CONTRACTS WILL CONTINUE TO FALL AS EMPHASIS INCREASES ON COMPETITIVELY
AWARDED CONTRACTS.
o EIGHTY-SEVEN PERCENT OF ALL SMALL PURCHASES WERE AWARDED WITHIN
THE STANDARD. PERFORMANCE WAS DOWN 8% FROM LAST QUARTER. OARM
ATTRIBUTES THE DROP TO A 40% INCREASE IN WORKLOAD AND TO EMPLOYEE
TRAINING DURING THE SECOND QUARTER.
-------
OQ
30i
25-
20-
15-
10-
(O
00
^f
LU
O
PROCUREMENT SERVICE STANDARDS
NEW CONTRACTS AWARDED DURING QUARfER
As Of March 31, 1986
COMPETITIVE
234
QUARTERS
LEGEND
1 I
20-1
15-
K
m
10-
SOLE SOURCE
1 2 3
QUARTERS
OARM DELAYS
DELAYS EXTERNAL TO OARM
COMPLETED WITHIN STANDARD OR NEGOTIATED SCHEDULE
-------
ADP SERVICE STANDARDS
o IN THE SECOND QUARTER FY 1986 THE PERCENTAGE OF BATCH PROCESSING JOBS
COMPLETED ON TIME ROSE AGAIN, TO 97% FROM 91% LAST QUARTER.
o THIS QUARTER OARM EXCEEDED ITS TARGET FOR INTERACTIVE PROCESSING
SERVICE TIME BY 7%.
O THERE WERE ONLY THREE COMPUTER SYSTEM FAILURES DURING THE SECOND
QUARTER, WELL WITHIN THE NUMBER ALLOWED BY THE STANDARD. THE STANDARD
FOR FY 1986 HAS BEEN HALVED TO.24 FAILURES PER QUARTER.
-------
(O
O
lOO-i
ADP SERVICE STANDARDS
As Of March 31,1986
SERVICE TIME
-TAMGCI tOX
2 3
QUARTERS
LEGEND
BATCH PROCESSING
INTERACTIVE PROCESSING
UJ 2°~
or
g
2 15-
O W-
QL
i
1 5
SYSTEM FAILURES
M FAILURES ALLOWABLE
1 2 3
QUARTERS
-------
AUDIT RESOLUTIONS
o AUDIT RESOLUTION WORKLOAD FOfcLOWS AN ANNUAL CYCLE, AS INDICATED BY
THE ACCOMPANYING GRAPH. WORKLOAD OF AUDITS RECEIVED HAS SLOWLY
INCREASED OVER THE PAST YEAR.
o AUDITS WORKLOAD IS LAGGED BY TWO QUARTERS: AUDITS RECEIVED IN SECOND
QUARTER MUST BE RESOLVED IN FOURTH QUARTER OR THEY WILL BE OVERDUE.
OARM RECEIVED 202 AUDITS TWO QUARTERS AGO (FOURTH QUARTER 1985), AND
RESOLVED 172 AUDITS DURING THE SECOND QUARTER FY 1986. THIS COMPARES
TO RECEIPT OF 129 AUDITS IN FOURTH QUARTER FY 1984 AND RESOLUTION
OF 179 AUDITS IN SECOND QUARTER FY 1985. OARM RECEIVED 137 AUDITS
DURING THE SECOND QUARTER.
o IN THE SECOND QUARTER, THE BACKLOG OF OVERDUE AUDITS REMAINS VERY
LOW AT 12 AUDITS, COMPARED TO 35 AUDITS A YEAR AGO. REGION II HOLDS
HALF OF THE BACKLOGGED AUDITS.
-------
AUDIT RESOLUTION WORKLOAD AND CLOSE-OUTS
As Of March 31, 1986
250-1
200-
B
GO
D
Z
150-
100-
50-
«O
UJ
to
o
4 Q 84 1 Q 85
LEGEND
AUDIT^ QVCRQUC
2 Q 85 3 0 85 4 Q 85 1 Q 86 2 Q 86
HtCCtVCP
An audit is due to be resolved within two
quarters after it is received. Audits not
resolved in that time become overdue audits,
-------
PERSONNEL SERVICE STANDARDS
O OARM'S PERSONNEL MANAGEMENT DIVISION CONTINUES TO COMPLETE NEARLY
ALL PERSONNEL ACTIONS WITHIN THE TIME SET BY OARM's STANDARD.
WORKLOAD REMAINS STEADY FROM LAST QUARTER.
O DURING THE SECOND QUARTER, OARM PROCESSED 1,561 PERSONNEL ACTIONS AND
PROCESSED 95% OF THOSE ACTIONS IN THE TOTAL TIME ALLOWED BY THE
STANDARD.
o FOR 96% OF THE INTERNAL RECRUITMENT ACTIONS, OARM COMPLETED ITS WORK
WITHIN THE STANDARD. Rl% OF THE QUARTER'S ACTIONS MET THE TOTAL
PROCESSING TIME STANDARD OF 10 TO 12 WEEKS. MOST OF THE DELAYS
OCCURRED IN CLIENT PROGRAM OFFICES.
O OARM COMPLETED ITS WORK WITHIN THE STANDARD FOR ALL RUT ONE OF THE 55
EXTERNAL RECRUITMENT ACTIONS IN THE SECOND QUARTER. 95% OF THE
QUARTER'S ACTIONS MET THE TOTAL TIME STANDARD OF JUST OVER 13 WEEKS.
o FOR 97% OF THE NON-COMPETITIVE ACTIONS, OARM COMPLETED ITS WORK
ON TIME. 95% OF THE QUARTER'S ACTIONS MET THE TOTAL PROCESSING TIME
STANDARD OF THREE TO FIVE WEEKS. MOST OF THE DELAYS OCCURRED IN
'OARM.
-------
PERSONNEL SERVICE STANDARDS
NUMBER OF ACTIONS COMPLETED DURING QUARTER
As Of March 31, 1986
RECRUITMENT ACTIONS
INTERNAL EPA
300-1
to
^
KT
LJ
to
O
1234
QUARTERS
RECRUITMENT ACTIONS
EXTERNAL 0PM
60-i
45-
30-
15-
NON-COMPETTT1VE
ACTIONS
350-1
300-
1 2-34
QUARTERS
LEGEND
r~~) OAW DELAYS
OWIDCLAYS
CUENT WOOKAM OFT1CC OOAYS
coMitrrnj WITHIN STANDARD SCHCDULI
1234
QUARTERS
-------
OFFICE OF POLICY, PLANNING AND EVALUATION
-------
OFFICE OF POLICY, PLANNING AND EVALUATION
RED BORDER REVIEW DEADLINES
o 33 RED BORDER DOCUMENTS WERE RECEIVED FOR REVIEW BY OPPE DURING THE
SECOND QUARTER VERSUS 39 FOR THE FIRST QUARTER.
- 33 RED BORDER REVIEWS (100%) WERE COMPLETED BY OPPE WITHIN THREE
WEEKS AGAINST A TARGET OF 80%.
-------
OPPE'S REPORT ON CHARACTERIZING AND VALUING MINOR HEALTH AFFECTS DUE TO
OZONE EXPOSURE (PART OF OZONE RIA FOR OAR) WAS SCHEDULED TO BE ISSUED
BY 3/31/86. OPPE -REPORTS:
o THE STUDY WAS COMPLETED IN A TIMELY MANNER AND PRESENTED TO AN EPA
PANEL IN FEBRUARY.
O THE FINDINGS THAT PEOPLE WERE WILLING TO PAY HIGH COSTS TO AVOID
MINOR HEALTH EFFECTS CAME AS A SURPRISE TO THEM.
O THEY EXPECT TO COMPLETE A REANALYSIS OF THE RESULTS OF THIS STUDY
BY EARLY NEXT FISCAL YEAR.
o OAR HAS EXTENDED ITS SCHEDULE FOR THE OZONE RIA BY MINE MONTHS THUS
PROVIDING ADDITIONAL TIME TO CARRY OUT THE REANALYSIS.
-------
OPPE'S MODEL OF GENERIC AIR DIFFUSION IN SUPPORT OF PARTICULATE MATTER
(PM) REGULATORY IMPACT ANALYSIS FOR OAR WAS SCHEDULED TO BE COMPLETED
BY 3/31/86. OPPE REPORTS:
o THE MODEL IS BEHIND SCHEDULE.
O THEY EXPECT TO COMPLETE AN INTERMEDIATE PRODUCT BY EARLY NEXT FISCAL
YEAR THAT WILL PROVIDE INFORMATION PERTINENT TO PM RULEMAKING.
o WORK WILL BE TIMELY, HOWEVER, SINCE OAR HAS EXTENDED ITS PM
RULEMAKING SCHEDULE.
-------
OPPE'S GENERIC BENEFIT ANALYSIS OF NEW SOURCE PERFORMANCE STANDARDS FOR
OAR WAS SCHEDULED TO BE COMPLETED BY 3/31/86. OPPE REPORTS:
o THIS EFFORT WAS. HELD IN ABEYANCE PENDING RESOLUTION WITHIN EPA OF
WHETHER OR NOT TO PROCEED WITH USING BENEFITS IN SETTING NEW SOURCE
PERFORMANCE STANDARDS.
o OPA, OAR AND ORD ARE NOW GOING FORWARD WITH A JOINT EFFORT ON A
BENEFIT ANALYSIS TIED TO THE OZONE NAAQS PROCESS.
o COMPLETION OF THE ANALYSIS IS NOW EXPECTED BY 12/31/86.
-------
-------
OFFICE OF EXTERNAL AFFAIRS
-------
NEPA COMPLIANCE
o THESE MEASURES SHOW AGENCY EFFORTS TO COMPLY WITH THE NATIONAL
ENVIRONMENTAL POLICY ACT, BY PERFORMING ENVIRONMENTAL ASSESSMENTS AND
WRITING ENVIRONMENTAL IMPACT STATEMENTS (EIS). SECTION 309 MEASURES
SHOW HOW EPA ASSISTS OTHER AGENCIES IN MEETING THEIR NEPA OBLIGATIONS.
EPA NEPA ACTIONS;
o 'IN THE FIRST TWO QUARTERS, 8 OF A TOTAL OF 78 NEPA ACTIONS ENDED IN A
CATEGORICAL EXCLUSION. 64 RESULTED IN FINDING OF NO SIGNIFICANT
IMPACT AFTER ENVIRONMENTAL ASSESSMENTS BY DELEGATED STATES OR REGIONS.
EPA REGIONS ISSUED 5 FINAL EISs AND 1 DRAFT EIS. MOST EPA .NEPA
ACTIONS INVOLVE CONSTRUCTION GRANTS.
NEPA RELATED SUPPORT (TO EPA PROGRAM OFFICES AND TO OUTSIDE AGENCIES);
o OEA HAS RESPONDED TO 53 OF 62 REQUESTS THIS YEAR FOR ASSISTANCE TO
HELP EPA PROGRAMS WORKING TO FULFILL VOLUNTARY EIS AND NEPA FUNCTIONAL
EQUIVALENCY RESPONSIBILITIES. OEA HAS NOT TARGETED FOR A RESPONSE RATE
o EPA HAS RESPONDED TO 1 OF 7 REQUESTS THIS YEAR TO COOPERATE WITH OTHER
FEDERAL AGENCIES WRITING ENVIRONMENTAL, IMPACT STATEMENTS. OEA
CONTRACT MONIES FOR GEOLOGISTS AND GROUNDWATER EXPERTS TO HELP WRITE
EISS HAVE BEEN CUT; THE LOW LEVEL OF RESPONSE TO THESE REQUESTS
REFLECTS THE LOWERED FUNDING LEVEL.
-------
NEPA COMPLIANCE
As Of March 31, 1986
BO-i
TRADITIONAL ACTIONS (CUMULATIVE)
NEPA RELATED SUPPORT (CUMULATIVE)
EPA PROGRAMS
COOPERATING
AGENCIES
UJ
V)
1234
QUARTERS
LEGEND
I I FINAL ENVIRONMENTAL IMPACT STATEMENTS ISSUED
CATEGORICAL EXCLUSIONS ISSUED
FINDINGS -Of NO SIGNIFICANT IMPACT ISSUED
I
10
20
30 40
NUMBER
50
70
LEGEND
REQUESTS FOR FUNDINO OR ASSISTANCE
ACTIONS MADE IN RESPONSE
-------
SECTION 309 ENVIRONMENTAL ASSESSMENT REVIEW
o SECTION 309 MEASURES SHOW HOW EPA ASSISTS OTHER AGENCIES TO COMPLY
WITH THE NATIONAL ENVIRONMENTAL POLICY ACT. NEPA MEASURES SHOW
EPA'S EFFORTS TO MEET ITS OWN -OBLIGATIONS UNDER NEPA.
PROJECT ACTIVITY;
o YEAR-TO-DATE, EPA HAS REVIEWED 123 DRAFT ENVIRONMENTAL IMPACT
STATEMENTS AND 546 ENVIRONMENTAL ASSESSMENTS, REGULATIONS AND LICENSE
APPLICATIONS. OF THOSE 669 PROJECTS, EPA IDENTIFIED SUBSTANTIVE
PROBLEMS WITH 33%, OR 224 PROJECTS.
o THIS YEAR MARKS A NEW EMPHASIS ON WORKING TO IDENTIFY AND RESOLVE
ENVIRONMENTAL PROBLEMS WITH NEPA-RELATED ACTIONS BEFORE EISs AND
OTHER DOCUMENTS ARE WRITTEN. TOWARD THAT" END, EPA REGIONS AND
HEADQUARTERS HAVE MADE 215 SUBSTANTIVE EARLY COORDINATION ACTIONS
WITH OTHER FEDERAL AGENCIES, AND INITIATED SUBSTANTIVE FOLLOW-UP
EFFORTS TO DISCUSS EPA CONCERNS REGARDING 136 PROJECTS. AS THESE
EFFORTS CONTINUE, OEA HOPES TO SEE A DECREASE IN EPA CONCERNS WITH
DRAFT AND FINAL PROJECTS.
PROJECT RESOLUTION;
o SO FAR THIS YEAR, EPA'S ENVIRONMENTAL CONCERNS WERE RESOLVED IN 87
121 (OR 67%) OF FINAL PROJECTS EISs, ENVIRONMENTAL ASSESSMENTS,
REGULATIONS AND LICENSE APPLICATIONS THAT HAD BEEN IDENTIFIED AS
PROBLEM CASES IN THE DRAFT STAGE.
-------
SECTION 309 ENVIRONMENTAL REVIEWS OF MAJOR FEDERAL PROJECTS
As Of March 31, 1986
250 -
'200-
g
O 150-
o:
LU
CD
2
z>
z
o
0
1
50-
PROJECT ACTIVITY
LEGEND
$
LJ
10
2
O
234
QUARTERS
PROJECTS RECEIVING EARU COORDINATION ACTIONS
DRAFT PROJECTS REVIEWED - NO CONCERNS
DRAFT PROJECTS REVIEWED - CONCERNS IDENTIFIED
PROJECTS RECEIVING FOLLOW-UP ACTION
HEPA PROJECTS INCLUDE EISs, ENVIRONMENTAL
ASSESSMENTS. REGULATIONS AND LICENSE APPLICATIONS
RESOLUTION OF EPA
CONCERNS IN FINAL PROJECT
1 2 3
QUARTERS
LEGEND
FINAL PROJECT - EPA CONCERNS UNRESOLVED
FINAL PROJECTS - EPA CONCERNS RESOLVED
-------
SECTION 404 PERMIT REVIEW
o .DURING THE SECOND QUARTER, EPA RAISED SIGNIFICANT ISSUES FOR 29% OF
THE 1,817 SECTION 404 PERMIT APPLICATIONS REVIEWED. FOR THE PAST TWO
YEARS, EPA HAS CONSISTENTLY VOICED CONCERN ABOUT 25% TO 30% OF THE
PERMIT APPLICATIONS IT REVIEWS.
o SINCE 1984 THE ARMY CORPS OF ENGINEERS HAS CONSISTENTLY ACCEPTED
BETWEEN 80% AND 95% OF EPA COMMENTS IN THE APPLICATION PROCESS. OF
THE 342 PENDING APPLICATIONS RESOLVED AFTER WITHDRAWALS IN SECOND
QUARTER FY 1986, THE CORPS:
ACCEPTED 318 (93%) OF EPA's RECOMMENDATIONS, DENYING 57 PERMITS
AND MODIFYING 261, AND
OVERRULED 24 (7%) OF EPA's RECOMMENDATIONS, ISSUING PERMITS
OVER EPA RECOMMENDATION FOR DENIAL OR WITHOUT EPA RECOMMENDED
MODIFICATIONS.
o THE NUMBER OF PERMITS AWAITING RESOLUTION BY THE CORPS AFTER EPA
REVIEW CONTINUES TO RISE, THIS QUARTER FROM 629 TO 701 PERMITS.
o ADVANCE IDENTIFICATION (AI) IS A NEW PART OF THE STRATEGY TO PROTECT
WETLANDS. AI WILL COMPLEMENT EPA'S PERMIT REVIEW ACTIVITY UNDER
§404 BY MARKING SOME WETLANDS AS INELIGIBLE FOR PERMITS. THE
REGIONS HAVE INITIATED 8 ADVANCE IDENTIFICATION ACTIONS THIS YEAR.
OEA EXPECTS TO INITIATE TEN OR MORE ACTIONS BY THE END OF FY 86 AND
TO COMPLETE MOST OF THESE ACTIONS BY THE END OF FY 87.
-------
700-1
SECTION 404 REVIEWS
As Of March 31, 1986
PENDING REVIEWS
BEGI
OF QUARTER
END OF
QUARTER
to
00
LJ
(/)
2
O
LEGEND
fcx^] NEW REVIEWS WITH COMMENTS
UNRESOLVED REVIEWS WITH COMMENTS
600-1
450-
300-
RESOLUTIONS
1234
QUARTERS
LEGEND
EPA OVERRULED
APPLICATION WITHDRAWN
FAVORABLE TO EPA
NUMBER OF 404 REVIEWS DURING THE QUARTER: 1,817
-------
SECTION 404 COMPLIANCE
o EPA PROVIDES TECHNICAL SUPPORT TO THE CORPS OF ENGINEERS ON PERMIT
ENFORCEMENT. BY THE END OF THE SECOND QUARTER, THE CORPS RECEIVED
TECHNICAL SUPPORT AT 39 SITES, AND 6 VIOLATORS WERE RETURNED TO COMPLIANCE,
AT THE SAME TIME LAST YEAR, THE CORPS HAD RECEIVED TECHNICAL SUPPORT
FOR 54 SITES AND 14 HAD BEEN RETURNED TO COMPLIANCE.
o EPA HAS THE AUTHORITY TO TAKE DIRECT ENFORCEMENT ACTIONS AGAINST
UNPERMITTED ACTIVITIES. ENFORCEMENT ACTION AGAINST UNPERMITTED DISCHARGES
V7AS INITIATED FOR 156 SITES (6.2 EPA LEAD AND 94 CORPS LEAD). 53 ACTIONS
HAVE BEEN RESOLVED THROUGH THE SECOND QUARTER AGAINST A TARGET OF 27.
REGIONS I, III AND X ARE NOTABLY AHEAD OF TARGET. LAST YEAR AT THIS
TIME, THERE WERE 102 ENFORCEMENT ACTIONS (37 EPA LEAD AND 65 CORPS LEAD).
-------
£
5
SECTION 404 COMPLIANCE
As Of March 31, 1986
EPA TECHNICAL SUPPORT TO CORPS OF ENGINEERS
{PERMITTED)
40 -i
fi]
CD
3
Z
O
160-
ENFORCEMENT ACTIVITY
(UNPERMrTTED)
SUPPORT RCCDVEO
YCOC
RETURNED
TO
COMPLIANCE
AODRXSS. IY tor sna
INFOKC.ACnON MSOIVIO IY
EN FOUC. ACTION
Legend
a cot
PA
QTAINCT
-------
INDIAN LANDS PROGRAM
o EPA REGIONS AND HEADQUARTERS HAVE PROVIDED TO TRIBES AND TRIBAL
ORGANIZATIONS APPROXIMATELY $2 MILLION YEAR-TO-DATE, COMPARED TO $3
MILLION BY THE SAME TIME IN FY 1985.
o THE REGIONS HAVE MADE 22 GRANTS TO TRIBAL GOVERNMENTS TO ASSIST THEIR
ENVIRONMENTAL PROTECTION EFFORTS', YEAR TO DATE. TEN GRANTS WILL GO
TO WORK UNDER THE AIR PROGRAM; TEN UNDER PESTICIDES; TWO UNDER WATER
PROJECTS. FIFTEEN OF THESE GRANTS WERE AWARDED BY REGION VIII.
o EPA HEADQUARTERS FUNDS TECHNICAL ASSISTANCE AND TR«.MING FOR INDIAN
TRIBES, INCLUDING:
$250,000 TO THE COUNCIL OF ENERGY RESOURCE TRIBES FOR MULTIMEDIA
TECHNICAL ASSISTANCE, AND
$120,000 FROM OEA FOR ENVIRONMENTAL PROTECTION TRAINING IN THE
REGIONS.
o REGION VIII HAS SIGNED SIX TRIBAL/EPA AGREEMENTS, FIVE RELATED TO
PESTICIDES AND ONE GENERAL AGREEMENT. REGION X HAS SIGNED ONE AGREEMENT,
WHICH WILL IMPLEMENT A WATER QUALITY TREATMENT PROGRAM.
-------
I
OFFICE OF GENERAL COUNSEL
-------
RED BORDER REVIEW DEADLINES
o 45 RED BORDER DOCUMENTS WERE RECEIVED FOR REVIEW BY OGC DURING THE
SECOND QUARTER VERSUS 65 DURING THE FIRST QUARTER.
- 35 RED BORDER REVIEWS WERE COMPLETED BY OGC WITHIN THREE WEEKS.
OGC COMPLETED 78% OF THEIR REVIEWS WITHIN THREE WEEKS, AGAINST A
TARGET OF 80%.
- 6 MORE REVIEWS WERE COMPLETED WITHIN FOUR WEEKS FOR AN OVERALL
COMPLETION RATE OF 91%.
- 4 REVIEWS WERE COMPLETED BEYOND THE GOAL OF 4 WEEKS.
REVIEW DEADLINES FOR STATE DELEGATION AGREEMENTS
o 9 AUTHORIZATION APPLICATIONS WERE RECEIVED FOR OGC EVALUATION DURING
THE SECOND QUARTER VERSUS 17 FOR THE FIRST QUARTER.
- ALL APPLICATIONS RECEIVED CONCURRENCE BY OGC WITHIN 15 DAYS,
MEETING THE 15 DAY TARGET.
- NO DEFICIENCIES WERE NOTED AND NO EXTENSIONS WERE REQUIRED.
------- |