100R88101
22
oo
U.S. Environmental Protection Agency
Strategic Planning and Management System
Second Quarter FY 1988 Re
Office of Management Systems
and Evaluation
March 31, 1988
HEADQUARTERS LIBRARY
PRnTFnTlflM ARFNfiY
-------
U.S. ENVIRONMENTAL PROTECTION AGENCY
STRATEGIC PLANNING AND MANAGEMENT SYSTEM
SECOND QUARTER 1988 REPORT
PREFACE
This quarterly report reviews Agency progress in meeting its
priority program commitments. The report is a major component of the
Agency Strategic Planning and Management System (SPMS). SPMS provides
a process for the Agency to identify national goals and priorities,
issue timely guidance to the field, identify measures of success and
track progress against them. Each quarter the Office of Management
Systems and Evaluation (OMSE) publishes the report using information
provided by Headquarters, Regional Offices, and State agencies. The
Office of Compliance Analysis and Program Operations is responsible for
the enforcement section of this report.
We gratefully acknowledge the assistance and cooperation of the
many people through the environmental protection management network who
have made timely production of this report possible.
-------
TABLE OF CONTENTS
OFFICE PAGE
OFFICE OF AIR AND RADIATION 1
OFFICE OF WATER 33
OFFICE OF SOLID WASTE AND EMERGENCY RESPONSE 93
OFFICE OF PESTICIDES AND TOXICS SUBSTANCES 127
OFFICE OF ENFORCEMENT AND COMPLIANCE MONITORING 157
OFFICE OF ADMINISTRATION AND RESOURCES MANAGEMENT 171
OFFICE OF POLICY, PLANNING AND EVALUATION 183
OFFICE OF EXTERNAL AFFAIRS 187
OFFICE OF GENERAL COUNSEL 201
-------
Office of Air and Radiation
-------
OFFICE OF AIR AND RADIATION
SECOND QUARTER HIGHLIGHTS
O EPA AND STATES ARE COMPLETING EMISSIONS INVENTORIES AND DRAFTING
SIPs TO ADDRESS THE PROBLEM OF PARTICULATE POLLUTION. REGIONS AND
STATES MET SECOND QUARTER TARGETS FOR OPERATING CRITICAL MONITORS AT
REQUIRED FREQUENCY AND FOR DESIGNING MONITOR NETWORKS.
o IN THE FIRST HALF, EPA COLLECTED 1987 OZONE AND CO MONITORING DATA
NEEDED TO SUPPORT SIP CALLS BY END OF YEAR. ANALYSIS OF THE DATA
CONTINUES.
o REGIONS FELL BEHIND SECOND QUARTER TARGETS TO ADDRESS DEFICIENCIES
IN SOME INSPECTION AND MAINTENANCE PROGRAMS TO CONTROL MOBILE SOURCE
POLLUTION.
o THE SULFUR DIOXIDE PROGRAM IS WORKING TO COMPLETE DEFICIENT OR
MISSING SIPs. REGIONS MET MOST SECOND QUARTER TARGETS FOR THIS
WORK.
O OAR PLANS TO PUBLISH GUIDANCE ON MEASUREMENT OF RADON IN SCHOOLS.
DRAFT GUIDANCE AND STATISTICAL ANALYSIS OF RECENT MEASUREMENTS IS
EXPECTED IN FALL 1988.
o THIS IS THE FIRST REPORTING OF POLLUTANT-SPECIFIC INSPECTION
ACTIVITIES FOR FY 1988. THE COMBINED EPA AND STATE COMMITMENTS
REFLECT THE APPLICATION OF THE PROGRAM'S REVISED INSPECTION
FREQUENCY GUIDANCE.
-3-
-------
OZONE / CARBON MONOXIDE
NON-ATTAINMENT
o OF 856 NON-ATTAINMENT (N/A) DESIGNATIONS NATIONWIDE, 40% (341) ARE
FOR OZONE AND 15% (127) FOR CARBON MONOXIDE (CO).
o OAR EXPECTS THAT IMPLEMENTATION OF THE POST-1987 OZONE POLICY WILL
CHANGE THE DEFINITION AND THEREFORE THE NUMBER OF N/A AREAS.
IMPLEMENTATION
o IN THE FIRST HALF, EPA RECEIVED, ON AN ACCELERATED SCHEDULE,
MONITORING DATA ABOUT 1987 LEVELS OF AMBIENT OZONE AND CO. THIS
QUARTER CONCLUDES THE COLLECTION EFFORT. THE ANALYZED DATA WILL
SUPPORT REQUESTS FOR STATE IMPLEMENTATION PLANS (SIP CALLS) FOR
AREAS WHICH MAY BE IN NON-ATTAINMENT. STATES AND REGIONS WILL ALSO
WORK ON EMISSIONS INVENTORIES AND CONTROL STRATEGIES AS THEY DEVELOP
SIPs.
o IN SECOND QUARTER, STATES PROVIDED DATA FROM 226 OZONE MONITORING
SITES AND 124 CO MONITORING SITES, EXCEEDING THE TARGETS OF 222 AND
106 SITES. EPA ALSO RECEIVED DATA IN THE FIRST QUARTER FROM NEARLY
ALL THESE SITES. OAR SPENT PART OF SECOND QUARTER FILLING GAPS IN
INFORMATION AND ASSURING DATA QUALITY.
-------
OZONE AND CARBON MONOXIDE
As Of March 31, 1988
DESIGNATED NON-ATTAINMENT AREAS
OAR-1
B56 DESIGNATIONS IN 530 COUNTIES
D NOx
S02 SECONDARY
S S02 PRIMARY
S TSP (SECONDARY)
ฎ TSP (PRIMARY)
B CO
M OZONE
"FAST TRACK" OZONE ANALYSIS
NUMBER OF SITES SUBMITTING DATA
28QT
"FAST TRACK" CARBON MONOXIDE
ANALYSIS
NUMBER OF SITES SUBMITTING DATA
-------
MOBILE SOURCES PROGRAMS
o IN THE FIRST HALF, REGIONS MISSED SEVERAL TARGETS TO REMEDY
DEFICIENCIES IDENTIFIED IN STATE INSPECTION AND MAINTENANCE (I/M)
PROGRAMS. TEN PROBLEMS WERE CORRECTED, AGAINST A TARGET OF 13.
REGIONS II, IV, V AND VII MISSED SECOND QUARTER GOALS.
REGIONS VI, VIII AND X MADE SOME FOURTH QUARTER TARGETS EARLY.
o IN THE FIRST HALF OF 1988, REGIONS SURPASSED THEIR TARGET BY PUTTING
5 NEW ANTI-TAMPERING PROGRAMS IN PLACE, BRINGING THE TOTAL TO 41
PROGRAMS. IN REGION V, TWO ANTI-TAMPERING PROGRAMS BEGAN IN OHIO;
IN REGION VIII, ONE IN COLORADO; AND IN REGION X, TWO IN NEVADA.
O PROGRAMS TO ASSURE THAT AUTOMOBILES AND TRUCKS CONTINUE TO COMPLY
WITH EMISSION STANDARDS ARE A COMPONENT OF MANY STATE IMPLEMENTATION
PLANS AND ARE REQUIRED IN CERTAIN NON-ATTAINMENT AREAS.
I/M PROGRAMS CONDUCT SYSTEMATIC TESTING AND/OR INSPECTION OF CARS
FOR EMISSIONS LEVELS WHICH SHOULD BE KEPT LOW BY PROPER MAINTENANCE.
ANTI-TAMPERING PROGRAMS WORK EITHER TO PREVENT ALTERATION OF
EMISSIONS CONTROLS ON MOBILE SOURCES, OR TO DETECT TAMPERING.
-------
MOBILE SOURCES
As Of March 31, 1988
INSPECTION AND MAINTENANCE
PROGRAM DEFICIENCIES CORRECTED
3&T
30--
24--
18--
12--
ANTI-TAMPERING
NEW STATE AND LOCAL PROGRAMS
10-r
B--
LEGEND
* TARGET
~ ACTUAL
QAR-2
-------
VOC COMPLIANCE AND ENFORCEMENT
COMPLIANCE RATES
OF THE 4,569 CLASS A SIP AND NSPS VOLATILE ORGANIC COMPOUND (VOC)
SOURCES IN OZONE NONATTAINMENT AREAS, 632 (14%) ARE EITHER IN VIOLA-
TION, IN VIOLATION BUT MEETING A COMPLIANCE SCHEDULE, OR THE COMPLI-
ANCE STATUS OF THE SOURCE IS UNKNOWN.
INSPECTIONS
(NOTEt INSPECTION DATA ARE LAGGED ONE QUARTER)
O THE REGIONS AND STATES ACCOMPLISHED 108% OF THEIR CUMULATIVE
INSPECTION COMMITMENT FOR VOC CLASS A SIP SOURCES IN OZONE NONATTAIN-
MENT AREAS.
o THE REGIONS AND STATES ACCOMPLISHED 109% OF THEIR CUMULATIVE
INSPECTION COMMITMENT FOR VOC NSPS SOURCES IN OZONE NONATTAINMENT
AREAS.
SIGNIFICANT VIOLATORS
O OF THE 338 VOC SIGNIFICANT VIOLATORS, 85 (25%) HAD REMEDIAL ACTION
COMMENCED PRIOR TO BOY. OF THE 253 REMAINING SIGNIFICANT VIOLATORS,
180 ARE SCHEDULED TO BE ADDRESSED BY THE END-OF-THE-YEAR. THE PRO-
GRAM EXCEEDED ITS CUMULATIVE SECOND QUARTER COMMITMENT (62 VIOLATORS
TO BE ADDRESSED) BY ADDRESSING 110 VIOLATORS.
O AT THE END OF THE SECOND QUARTER, THE DISTRIBUTION OF THE 338 VOC
SIGNIFICANT VIOLATORS IS AS FOLLOWS:
- 96 (28%) ARE IN COMPLIANCE
- 23 (7%) ARE ON ACCEPTABLE SCHEDULES
- 85 (25%) HAVE HAD ENFORCEMENT ACTION INITIATED
- 134 (40%) ARE UNRESOLVED
O FORTY-FOUR NEW VOC SIGNIFICANT VIOLATORS WERE IDENTIFIED DURING THE
QUARTER, BRINGING THE TOTAL FOR THE YEAR TO 69. ELEVEN OF THESE HAVE
BEEN PLACED ON A COMPLIANCE SCHEDULE OR RETURNED TO COMPLIANCE.
-------
VOC COMPLIANCE AND ENFORCEMENT
IN OZONE NONATTAINMENT AREAS
As Of March 31, 1988
SIGNIFICANT VIOLATORS
BOY
A/E-6
1
QUARTERS
LEGEND
D RETURNED TO COMPLIANCE
gl ON COMPLIANCE SCHEDULE
E3 ENFORCEMENT ACTION TAKEN
PENDING
CLASS A SIP INSPECTIONS
125+1
- -TARGET
I H HI IV
vi vn vm ix x
-9-
-------
PARTICULATES
THIS YEAR OAR IS WORKING TO MAKE A TRANSITION FROM THE STANDARD FOR
TOTAL SUSPENDED PARTICULATES (TSP) TO A NEW STANDARD REGULATING ONLY
PARTICULATE MATTER OF DIAMETER LESS THAN 10 MICRONS (PM10)
SIP DEVELOPMENT
O OAR IS DEVELOPING STATE IMPLEMENTATION PLANS (SIPs) TO CONTROL PM10
IN GROUP I AND II AREAS OF CONCERN. SIP DEVELOPMENT INVOLVES
COMPLETION OF EMISSIONS INVENTORIES, ESTABLISHMENT OF DESIGN VALUES
AND OF CONTROL STRATEGIES, AND SUBMITTAL AND REVIEW OF SIPs.
O IN FY 1988, STATES HAVE COMPLETED 27 PM10 DRAFT EMISSIONS
INVENTORIES FOR GROUP I AREAS, EXCEEDING THE SECOND QUARTER TARGET.
O ONLY REGION VIII HAD SECOND QUARTER TARGETS TO RECEIVE GROUP I DRAFT
SIPs. THE 5 DRAFT SIPs EXPECTED FROM COLORADO ARE HELD UP PENDING
OAQPS REVIEW THAT THE SIP STRATEGY PROVIDES ADEQUATE CONTROL.
o REGION X RECEIVED FIVE GROUP I DRAFT SIPs IN SECOND QUARTER, THOUGH
THE REGION TARGETED NONE. NATIONALLY, REGIONS EXPECT TO RECEIVE 39
DRAFT SIPs BY END OF YEAR.
MONITORING
o EPA AND STATES ARE BUILDING NETWORKS OF PM10 MONITORS REQUIRED AS
PART OF THE SIP EFFORT. SPMS TRACKS THIS WORK IN TWO AREAS:
APPROVING DESIGNS OF NETWORKS, AND ESTABLISHING MONITORS IN CRITICAL
AREAS.
o THIS YEAR, STATES MUST SUBMIT PLANS TO INSTALL NATIONAL (NAMS) AND
STATE AND LOCAL (SLAMS) AIR MONITORING SYSTEMS. SO FAR EPA HAS
APPROVED 4 OF THE 46 NAMS PLANS EVENTUALLY REQUIRED, AND 12 OF THE
54 REQUIRED SLAMS PLANS.
o TO ASSESS PM10 POLLUTION IN PROBLEM AREAS, SOME MONITORS ARE
REQUIRED TO OPERATE AT HIGH FREQUENCY (DAILY OR EVERY OTHER DAY).
NATIONALLY, 113 OF 139 URBANIZED AREAS, 29 OF 41 GROUP I AREAS, AND
36 OF 59 GROUP II AREAS HAVE AT LEAST ONE MONITOR OPERATING AT THE
r>f/-ปTT-|-T-ปT-ir-ป
-------
PARTICULATES
As Of March 31, 1988
ESTABLISHMENT OF AIR MONITORING SYSTEMS
NATIONAL (NAMS)
46 PLANS REQUIRED
STATE AND LOCAL (SLAMS)
54 PLANS REQUIRED
URBAN AREAS WITH (REQUIRED)
FREQUENT PM10 MONITORING
LEGEND
PLANS NOT RECEIVED
E3 PLANS UNDER REVIEW
D PLANS APPROVED
16Qi
1 IkllV/CDCC
UNlVuKot.
120-
80-
40-
n-
/ '
/s
/s
e. 1 1 1 1
01 02 03 04
LEGEND
- TARGET
ACTUAL
GROUP I AND GROUP H AREAS WITH
(REQUIRED) FREQUENT PM10 MONITORING
132-r
UNIVERSE
B8+
02
OAR-35,36
03 04
OAR-37.38.39
-11-
-------
TSP COMPLIANCE AND ENFORCEMENT IN PMin GROUP I AND II AREAS
COMPLIANCE RATES
OF THE 4,080 TSP CLASS A SIP AND TSP NSPS SOURCES IN GROUP I AND II
AREAS, 323 (8%) ARE EITHER IN VIOLATION, IN VIOLATION BUT MEETING A
COMPLIANCE SCHEDULE, OR THE COMPLIANCE STATUS OF THE SOURCE IS UNKNOWN.
INSPECTIONS
(NOTE: INSPECTION DATA ARE LAGGED ONE QUARTER)
THE REGIONS AND STATES ACCOMPLISHED 110% OF THEIR CUMULATIVE INSPECTION
COMMITMENT FOR TSP CLASS A SIP SOURCES IN GROUP I AND II AREAS.
THE REGIONS AND STATES ACCOMPLISHED 166% OF THEIR CUMULATIVE INSPECTION
COMMITMENT FOR TSP NSPS SOURCES IN GROUP I AND II AREAS.
SIGNIFICANT VIOLATORS
OF THE 109 TSP SIGNIFICANT VIOLATORS IN GROUP I AND II AREAS, 26
(24%) HAD REMEDIAL ACTION COMMENCED PRIOR TO BOY. OF THE 83 REMAINING
SIGNIFICANT VIOLATORS, 72 ARE SCHEDULED TO BE ADDRESSED BY THE END-OF-
THE-YEAR. THE PROGRAM EXCEEDED ITS CUMULATIVE SECOND QUARTER COMMIT-
MENT (24 VIOLATORS TO BE ADDRESSED) BY ADDRESSING 32 VIOLATORS.
AT THE END OF THE SECOND QUARTER, THE DISTRIBUTION OF THE 109 TSP
SIGNIFICANT VIOLATORS IS AS FOLLOWS:
- 28 (26%) ARE IN COMPLIANCE
- 9 (8%) ARE ON ACCEPTABLE SCHEDULES
- 20 (18%) HAVE HAD ENFORCEMENT ACTION INITIATED
- 52 (48%) ARE UNRESOLVED
NINETEEN NEW TSP SIGNIFICANT VIOLATORS WERE IDENTIFIED DURING THE
QUARTER, BRINGING THE TOTAL FOR THE YEAR TO 28. FOUR OF THESE HAVE
BEEN PLACED ON A COMPLIANCE SCHEDULE OR RETURNED TO COMPLIANCE.
-------
TSP COMPLIANCE AND ENFORCEMENT IN PM-10 GROUP I & II AREAS
As Of March 31, 1988
SIGNIFICANT VIOLATORS
BOY
A/E-9
QUARTERS
LEGEND
D RETURNED TO COMPLIANCE
E9 ON COMPLIANCE SCHEDULE
0 ENFORCEMENT ACTION TAKEN
PENDING
CLASS A SIP INSPECTIONS
125+1
-TARGET
i nraivvvivnvmixx
-13-
-------
SULFUR DIOXIDE
SIP COMPLETIONS
o IN FY 1988, OAR IS WORKING TO COMPLETE DEFICIENT SIPs RELATED TO
SULFUR DIOXIDE. THESE SIPs FALL INTO THREE CATEGORIES:
SIPs IN RESPONSE TO EPA'S REVISED STACK HEIGHT RULE PUBLISHED
IN JULY 1985. (DUE APRIL 1986)
UNFINISHED SIPs FOR NON-ATTAINMENT AREAS (PART D SIPs).
SIP REVISIONS, USUALLY EMISSION LIMITS, FOR ATTAINMENT AREAS.
o IN SECOND QUARTER, REGIONS MET NEARLY ALL TARGETS FOR EACH CATEGORY.
17 STACK HEIGHT RULES PASSED ONE OR TWO MILESTONES IN THE FIRST
HALF. RULES FOR VA, TX, AR, LA AND NC ARE CURRENTLY AT HQ FOR
REVIEW. OTHERS ARE UNDER REGIONAL REVIEW OR HAVE BEEN PUBLISHED.
o THREE PART D SIPs IN PENNSYLVANIA AND WISCONSIN HAVE PASSED
MILESTONES SO FAR THIS YEAR. THREE EMISSION LIMITS RULES IN
DELAWARE, WISCONSIN AND MINNESOTA ALSO MOVED FORWARD.
-------
SULFUR DIOXIDE
COMPLETION OF DEFICIENT SIPs
As Of March 31, 1988
SIP REVISION MILESTONES:
STACK HEIGHT REGS
01 02 03 04
SIP COMPLETION MILESTONES: SIP REVISION MILESTONES:
UNFINISHED PART D SIPs SECTION 110 EMISSION LIMITS
1DT
12-]
8
4-
1
8.
s
/
' 6
/s
/
*
/
S
^^ 2
-**"***"/
i i ' r ^
-^*-~~~~~i j-X i i i A,
^ v - \ 1 1 U
01 02 03 04
**
s
s
s
s
/
s
/
s
./
J*'
JT
^f
^r
^f
'v \ \ I
01 02 03 04
OAR 67.69,71
-15-
-------
SULFUR DIOXIDE COMPLIANCE AND ENFORCEMENT
COMPLIANCE RATES
O OF THE 241 SULFUR DIOXIDE SOURCES IN SULFUR DIOXIDE NONATTAINMENT
AREAS, 35 (15%) ARE EITHER IN VIOLATION, IN VIOLATION BUT MEETING A
COMPLIANCE SCHEDULE, OR THE COMPLIANCE STATUS OF THE SOURCE IS UNKNOWN.
INSPECTIONS
(NOTE: INSPECTION DATA ARE LAGGED ONE QUARTER)
o THE REGIONS AND STATES ACCOMPLISHED 150% OF THEIR CUMULATIVE INSPECTION
COMMITMENT FOR S02 CLASS A SIP SOURCES IN S02 NONATTAINMENT AREAS.
O THE REGIONS AND STATES ACCOMPLISHED 40% OF THEIR CUMULATIVE INSPECTION
COMMITMENT FOR SO2 NSPS SOURCES IN SO2 NONATTAINMENT AREAS.
SIGNIFICANT VIOLATORS
O OF THE 34 SO2 SIGNIFICANT VIOLATORS, SEVEN (21%) HAD REMEDIAL ACTION
COMMENCED PRIOR TO BOY. OF THE 27 REMAINING SIGNIFICANT VIOLATORS,
NINE ARE SCHEDULED TO BE ADDRESSED BY THE END-OF-THE-YEAR. THE
PROGRAM EXCEEDED ITS CUMULATIVE SECOND QUARTER COMMITMENT (TWO VIO-
LATORS TO BE ADDRESSED) BY ADDRESSING SIX VIOLATORS.
O AT THE END OF THE SECOND QUARTER, THE DISTRIBUTION OF THE 34 S02
SIGNIFICANT VIOLATORS IS AS FOLLOWS:
- 3 (8%) ARE IN COMPLIANCE
- 2 (6%) ARE ON ACCEPTABLE SCHEDULES
- 8 (24%) HAVE HAD ENFORCEMENT ACTION INITIATED
- 21 (62%) ARE UNRESOLVED
o FORTY-SIX NEW SO2 SIGNIFICANT VIOLATORS HAVE BEEN IDENTIFIED THUSFAR
IN FY 1988. NONE HAVE BEEN PLACED ON AN ACCEPTABLE SCHEDULE OR BEEN
RETURNED TO COMPLIANCE.
-------
32T
24-
N
U
M
B
E
R
16-
SULFUR DIOXIDE COMPLIANCE AND ENFORCEMENT
IN S02 NONATTAINMENT AREAS
As Of March 31, 1988
SIGNIFICANT VIOLATORS CLASS A SIP INSPECTIONS
125+
BOY
A/E-15
2 3
QUARTERS
LEGEND
D RETURNED TO COMPLIANCE
El ON COMPLIANCE SCHEDULE
0 ENFORCEMENT ACTION TAKEN
PENDING
H TARGET
i nmrvvvivnvmixx
-------
AIR TOXICS PROGRAM
o IN THE FIRST HALF, EPA HAS APPROVED 25 MULTI-YEAR DEVELOPMENT PLANS
(MYDPs) AS ADEQUATE, MEETING THE TARGET OF 15 ADEQUATE PLANS. AT
QUARTER'S END, AN ADDITIONAL 20 PLANS ARE BEING REVIEWED. AT THIS
TIME LAST YEAR, 46 PLANS HAD BEEN DEEMED ADEQUATE.
o MYDPs DEFINE THE AIR TOXICS PROBLEMS OF STATES OR LOCALITIES AND THE
STRATEGIES TO ADDRESS THOSE PROBLEMS. LAST YEAR 65 PLANS WERE IN
PLACE; THEY MUST BE REVISED ANNUALLY TO KEEP EPA APPROVAL AND
FUNDING. THIS YEAR EPA IS WORKING WITH STATES TO INTEGRATE THEIR
AIR TOXICS ACTIVITIES WITH UPCOMING SIP REVISIONS FOR OZONE AND
PARTICULATES.
-19-
-------
NESHAP (NON-TRANSITORY) COMPLIANCE AND ENFORCEMENT
COMPLIANCE RATES
O OF THE 939 NESHAP (NON-TRANSITORY) SOURCES, 123 (13%) ARE EITHER IN
VIOLATION, IN VIOLATION BUT MEETING A COMPLIANCE SCHEDULE, OR THE
COMPLIANCE STATUS OF THE SOURCE IS UNKNOWN.
INSPECTIONS
(NOTE; INSPECTION DATA ARE LAGGED ONE QUARTER)
O THE REGIONS AND STATES ACCOMPLISHED 108% OF THEIR CUMULATIVE INSPECTION
COMMITMENT FOR NESHAP SOURCES.
SIGNIFICANT VIOLATORS
O OF THE 44 NON-TRANSITORY NESHAP SIGNIFICANT VIOLATORS, 11 (25%) HAD
REMEDIAL ACTION COMMENCED PRIOR TO BOY. OF THE 33 REMAINING SIGNIFI-
CANT VIOLATORS, 31 ARE SCHEDULED TO BE ADDRESSED BY THE END-OF-THE-
YEAR. THE PROGRAM EXCEEDED ITS CUMULATIVE SECOND QUARTER COMMITMENT
(16 VIOLATORS TO BE ADDRESSED ) BY ADDRESSING 23 VIOLATORS.
O AT THE END OF THE SECOND QUARTER, THE DISTRIBUTION OF THE 43 NESHAP
SIGNIFICANT VIOLATORS IS AS FOLLOWS:
- 26 (59%) ARE IN COMPLIANCE
- 3 (7%) ARE ON ACCEPTABLE SCHEDULES
- 5 (11%) HAVE HAD ENFORCEMENT ACTION INITIATED
- 10 (23%) ARE UNRESOLVED
O EIGHT NEW NESHAP SIGNIFICANT VIOLATORS WERE IDENTIFIED DURING THE
QUARTER, BRINGING THE TOTAL FOR THE YEAR TO 24. EIGHT OF THESE HAVE
BEEN PLACED ON A COMPLIANCE SCHEDULE OR RETURNED TO COMPLIANCE.
-------
45r
NESHAP COMPLIANCE AND ENFORCEMENT
As Of March 31, 1988
SIGNIFICANT VIOLATORS
BOY
A/E-12
1 2 3
QUARTERS
LEGEND
D RETURNED TO COMPLIANCE
H ON COMPLIANCE SCHEDULE
E3 ENFORCEMENT ACTION TAKEN
PENDING
125+
INSPECTIONS (NON-TRANSITORY)
-TARGET
i n m rv v vi vii vm ix x
-------
AIR SIGNIFICANT VIOLATORS (COMBINED REPORT)
OF THE 703 SIGNIFICANT VIOLATORS, 166 (24%) HAD REMEDIAL ACTION
COMMENCED PRIOR TO BOY. OF THE 537 REMAINING SIGNIFICANT VIOLATORS,
386 (72%) ARE SCHEDULED TO BE ADDRESSED BY THE END-OF-THE-YEAR.
PROGRAM EXCEEDED ITS CUMULATIVE SECOND QUARTER COMMITMENT (148 VIOLA-
TORS TO BE ADDRESSED) BY ADDRESSING 260 VIOLATORS.
AT THE END OF THE SECOND QUARTER, THE DISTRIBUTION OF THE 703 VOC
SIGNIFICANT VIOLATORS IS AS FOLLOWS:
- 211 (30%) ARE IN COMPLIANCE
- 65 (9%) ARE ON ACCEPTABLE SCHEDULES
- 149 (21%) HAVE HAD ENFORCEMENT ACTION INITIATED
- 278 (40%) ARE UNRESOLVED
ONE HUNDRED AND SEVENTY-EIGHT SIGNIFICANT VIOLATORS ARE NOT A PART OF
THE POLLUTANT-SPECIFIC REPORTS DISCUSSED PREVIOUSLY. OF THE 178
VIOLATORS, 37 HAD ENFORCEMENT ACTION COMMENCED AT BOY. THE DISTRIBU-
TION OF THE 178 REMAINING SIGNIFICANT VIOLATORS AT THE END OF THE
SECOND QUARTER IS AS FOLLOWS:
- 58 (33%) ARE IN COMPLIANCE
- 28 (16%) ARE ON ACCEPTABLE SCHEDULES
- 31 (17%) HAVE HAD ENFORCEMENT ACTION INITIATED
- 61 (34%) ARE UNRESOLVED
A TOTAL OF 210 NEW SIGNIFICANT VIOLATORS HAVE BEEN IDENTIFIED YEAR
TO DATE (COMPARED TO 285 AT THIS POINT IN FY 1987). FORTY OF THE
NEW SIGNIFICANT VIOLATORS HAVE BEEN PLACED ON A COMPLIANCE SCHEDULE
OR RETURNED TO COMPLIANCE.
-------
STATUS OF SIGNIFICANT AIR VIOLATORS
As Of March 31, 1988
N
U
M
B
E
R
750 T
625-
500
375--
250-
125-
BOY
A/ER-5.6
QUARTERS
LEGEND
PENDING
E2 ENFORCEMENT ACTION
El ON ACCEPTABLE SCHEDULES
D IN COMPLIANCE
-23-
-------
AIR ENFORCEMENT ACTIVITY
EPA AND STATE ENFORCEMENT INITIATION
THE EPA REGIONS HAVE ISSUED 105 ADMINISTRATIVE ORDERS THROUGH THE
FIRST TWO QUARTERS, COMPARED TO 50 THROUGH THE SECOND QUARTER OF
FY 1987. THE STATES REPORTED ISSUANCE OF 168 ADMINISTRATIVE ORDERS
IN THE FIRST QUARTER, COMPARED TO 251 TAKEN IN THE FIRST QUARTER OF
FY 1987 (A DECLINE OF 33%).
THE EPA REGIONS HAVE REFERRED 32 CIVIL JUDICIAL CASES THROUGH THE
SECOND QUARTER, COMPARED TO 27 THROUGH THE SECOND QUARTER OF FY 1987,
THE STATES REPORTED REFERRAL OF 57 JUDICIAL CASES COMPARED TO 96 IN
THE FIRST QUARTER OF FY 1987 (A DECLINE OF 40%). NEITHER EPA OR THE
STATES HAVE REFERRED ANY AIR CRIMINAL CASES THUSFAR IN FY 1988.
EPA CIVIL CASE CONCLUSIONS
AT THE BEGINNING OF THE YEAR, 218 CASES WERE PENDING REVIEW AT DOJ,
THE US ATTORNEY, OR FILED IN COURT. BY THE END OF THE SECOND QUAR-
TER, 31 CASES HAD BEEN CONCLUDED AFTER FILING AND 3 CASES WITHDRAWN
OR DECLINED PRIOR TO FILING. THE REMAINING 184 CASES (INCLUDING 6
CASES RETURNED BY DOJ FOR PRE-FILING NEGOTIATIONS) PLUS THE 32 NEW
CASE REFERRALS COMPRISE A PENDING DOCKET OF 216 CASES.
NOTE: STATE DATA FOR BOTH FY 1987 AND FY 1988 DATA IS LAGGED ONE
QUARTER.
-------
AIR ENFORCEMENT ACTIVITY
As Of March 31, 1988
STATE AND EPA
ENFORCEMENT INITIATION
ADMINISTRATIVE ORDERS
(CUMULATIVE)
600T
500-
400-
N
U
M
B
E
R
300
200-
100
STATE AND EPA
ENFORCEMENT INITIATION
CIVIL REFERRALS
(CUMULATIVE)
A/ER-3.4
Z3U-
200
a a a c
m a m
t T-
z=>2cnuja:
234
L
1
QUARTERS
LEGEND
D STATE
EPA
QUARTERS
EPA CIVIL CONCLUSIONS
250T
BOYACTWE CONCLUDED PENDING
CASE DOCKET
LEGEND
PENDING FROM BOY
E2 CONCLUDED
Q NEW REFERRALS FROM REGIONS
-25-
-------
AIR - FEDERAL FACILITY COMPLIANCE
O THE REGIONS IDENTIFIED 14 FEDERAL FACILITY SIGNIFICANT VIOLATORS AT
THE BEGINNING-OF-THE-YEAR. THE REGIONS TARGETED TO HAVE ADDRESSED
FOUR OF THE 14 BY THE END OF THE SECOND QUARTER, AND HAVE ADDRESSED
THREE.
o TWO NEW FEDERAL FACILITY SIGNIFICANT VIOLATORS HAVE BEEN IDENTIFIED
THUS FAR IN FY 1988.
-------
AIR - FEDERAL FACILITY COMPLIANCE
As Of March 31, 1988
SIGNIFICANT VIOLATORS
20-r
BOY
QUARTERS
A/ER-1,5
LEGEND
I ADDRESSED
PENDING
-27-
-------
ASBESTOS DEMOLITION AND RENOVATION ACTIVITY
O THROUGH THE SECOND QUARTER, THE EPA REGIONS REPORT RECEIVING 9,206
NOTIFICATIONS OF ASBESTOS DEMOLITION. THE STATES REPORT RECEIPT OF
8,049 NOTIFICATIONS IN THE FIRST QUARTER.
o THE REGIONS HAVE CONDUCTED 294 INSPECTIONS THROUGH THE SECOND QUARTER
AND REPORT IDENTIFICATION OF 41 SUBSTANTIVE VIOLATIONS. THE STATES
REPORT CONDUCTING 4,190 INSPECTIONS IN THE FIRST QUARTER AND IDENTI-
FICATION OF 152 SUBSTANTIVE VIOLATIONS.
o EPA HAS ISSUED 56 ADMINISTRATIVE ORDERS AND REFERRED 14 CIVIL JUDICIAL
ACTIONS, AND THE STATES HAVE ISSUED 34 ADMINISTRATIVE ACTIONS AND
REFERRED SIX CIVIL CASES. IN FY 1987, EPA ISSUED 45 ORDERS THROUGH
THE SECOND QUARTER AND REFERRED SEVEN CIVIL JUDICIAL ACTIONS. AT
THIS TIME LAST YEAR, THE STATES HAD ISSUED 51 ADMINISTRATIVE ACTIONS
AND REFERRED 11 JUDICIAL CASES.
NOTE: STATE DATA IS LAGGED ONE QUARTER.
-------
ASBESTOS DEMOLITION AND RENOVATION ACTIVITY
As Of March 31, 1988
(CUMULATIVE)
18000-r
NUMBER
OF
NOTinCATIONS
NUMBER
OF
INSPECTIONS
NUMBER
OF
VIOLATIONS
A/ER-7
LEGEND
EPA
El STATES
-29-
-------
RADON
THE FY 1988 RADON PROGRAM IS WORKING WITH STATES AND REGIONS TO PROVIDE
INFORMATION TO THE PUBLIC ABOUT RADON AND TO ASSESS THE SEVERITY OF THE
PROBLEM THROUGHOUT THE COUNTRY.
SURVEYS
o IN ADDITION TO TEN 1987 EPA/STATE SURVEYS, EPA/STATE SURVEYS
CONTINUE IN SEVEN STATES AND INDIAN TERRITORIES IN 1988. RESULTS
WILL BE ANNOUNCED IN LATE SUMMER. FOUR STATES THAT PARTICIPATED
IN THE 1987 EPA/STATE SURVEYS WILL COMPLETE FOLLOW-UP SURVEY
ACTIVITIES NEXT QUARTER.
o TEN STATES CONTINUE INDEPENDENT RADON SURVEYS. IN ADDITION, LOCAL
AND REGIONAL GOVERNMENTS AS WELL AS OTHER FEDERAL AGENCIES AND
PRIVATE ORGANIZATIONS CONTINUE TO CONDUCT RADON SURVEYS.
o ELEVEN STATES CONDUCTED RADON SURVEYS IN SCHOOLS DURING THE LAST TWO
QUARTERS. SEVERAL MORE ARE PLANNING SURVEYS IN SCHOOLS THIS SUMMER.
EPA WILL ISSUE INTERIM GUIDANCE IN THE FALL FOR THE MEASUREMENT OF
RADON IN SCHOOLS.
o RESULTS OF SURVEYS (EPA, STATE OR PRIVATE SECTOR) VARY WIDELY.
EXAMPLES: A PRIVATE SECTOR SURVEY IN INDIANA FOUND THAT IN 65% OF
1000 STRUCTURES SURVEYED, RADON LEVELS EXCEEDED 4 PICOCURIES PER
LITER (pCi/L) OF AIR. AN INDIAN HEALTH SERVICE SURVEY OF 100
HOMES ON A RESERVATION IN REGION VII, FOUND 25% OF THE
MEASUREMENTS EXCEEDED 4 pCi/L. A MONTANA SURVEY OF 4 SCHOOLS
FOUND NONE THAT EXCEEDED 4 pCi/L.
OTHER RADON ACTIVITIES
O EPA AND STATES CONTINUE TO REPORT HIGH PUBLIC INTEREST. STATES AND
REGIONS RESPOND TO NUMEROUS PHONE INQUIRIES, AND EPA HAS DISTRIBUTED
HUNDREDS OF THOUSANDS OF COPIES OF RADON LITERATURE.
o EPA TRAINING ACTIVITIES CONTINUE. THE RADON AND MITIGATION TRAINING
COURSE WILL BE UPDATED AND PRESENTED EIGHT TIMES THROUGHOUT THE
COUNTRY THIS YEAR. ELEVEN STATES MAY PARTICIPATE IN THE FY 1988
HOUSE EVALUATION PROGRAM.
o 1,100 COMPANIES HAVE APPLIED TO PARTICIPATE IN THE RADON MEASUREMENT
PROFICIENCY PROGRAM; RESULTS ARE EXPECTED IN FALL 1988.
-31-
-------
Office of Water
-33-
-------
OFFICE OF WATER
SECOND QUARTER HIGHLIGHTS
THE REGIONS AND THE STATES SHOW GOOD PERFORMANCE AGAINST TARGETS.
FOR NON-ENFORCEMENT ACTIVITIES, 17 OF 29 TARGETS WERE MET OR EXCEEDED.
o MAJOR SUCCESSES WERE IN THE UNDERGROUND INJECTION CONTROL (UIC),
GROUNDWATER, PRETREATMENT, NATIONAL MUNICIPAL POLICY, CONSTRUCTION
GRANTS, STATE TOXICS CONTROL, AND WETLANDS PROGRAMS.
- THE UIC PROGRAM MET SIX OF SEVEN TARGETS.
- THE GROUNDWATER PROGRAM IS REPORTED HERE FOR THE FIRST TIME, AND
31 SOLE SOURCE AQUIFERS HAVE BEEN DESIGNATED SO FAR.
- THE PRETREATMENT PROGRAM MET OR EXCEEDED FIVE OF SIX TARGETS.
- THE NATIONAL MUNICIPAL POLICY PROGRAM IS PROCEEDING WELL TOWARD
MEETING THE JULY 1, 1988 DEADLINE.
- CONSTRUCTION GRANTS NET OUTLAYS WERE 99.1% OF THEIR SPENDING
TARGET, AND STATES HAVE INCREASED ADMINISTRATIVE COMPLETIONS OF
THEIR BACKLOGGED PROJECTS.
- STATES HAVE STARTED SUBMITTING ADEQUATE NONPOINT SOURCE CONTROL
PROGRAMS, AND FIVE STATES HAVE COMPLETED ACTION PLANS IN THEIR
TOXIC CONTROL PROGRAMS FOR SURFACE WATERS.
- THE WETLANDS PROGRAM CONTINUES TO REPORT ACRES AT RISK WHERE LOSS
AVOIDED, AND THE TWO TARGETS FOR ADVANCE IDENTIFICATION WERE MET.
O THERE WERE SHORTFALLS IN THE OCEAN DUMPING AND NPDES PROGRAMS.
- IN OCEAN DUMPING, THREE OF FOUR TARGETS WERE MISSED; THE NEPA
PROCESS TAKES TIME AND IS OFTEN LITIGATED.
- THE NPDES PROGRAM MISSED THREE OF FOUR TARGETS, HOWEVER EPA AND
THE STATES BOTH INCLUDED WQA TOXIC LIMITS IN MOST PERMITS.
FOR ENFORCEMENT ACTIVITIES, ALL THREE TARGETS (IN THE UIC AND NPDES
PROGRAMS) WERE EXCEEDED.
- THERE WAS A LARGE INCREASE IN THE NUMBER OF UIC WELLS FOUND IN
SIGNIFICANT NONCOMPLIANCE SINCE LAST QUARTER.
- NPDES REFERRALS BY STATES TO STATE AGs IS UP SIGNIFICANTLY.
-------
UIC CLASS I WELLS PERMIT DETERMINATIONS
o UIC CLASS I WELLS ARE DEEP WELLS INJECTING WASTE BELOW DRINKING
WATER SOURCES.
MADE BY EPA
o FOR FY 1988, THE REGIONS TARGETED 17 NEW AND EXISTING CLASS I PERMIT
DETERMINATIONS FOR THE YEAR.
O THROUGH THIS QUARTER, THE REGIONS MADE THREE PERMIT DETERMINATIONS
(TWO WERE DENIED/WITHDRAWN, AND ONE WAS MODIFIED), ACHIEVING 29% OF
THEIR TARGET OF SEVEN.
MADE BY PRIMACY STATES
o SINCE DATA FOR THE PRIMACY STATES IS LAGGED ONE QUARTER, THIS REPORT
COVERS THE FIRST QUARTER.
o BY 1990, STATES MUST REPERMIT 435 EXISTING CLASS I WELLS INTO 350
PERMITS (SOME WELLS WILL BE COMBINED INTO MULTIPLE WELL PERMITS).
o BY THE END OF FIRST QUARTER, THE PRIMACY STATES MADE 17 CLASS I WELL
PERMIT DETERMINATIONS, 243% OF THE TARGET OF SEVEN.
o TWO PERMITS WERE DENIED/WITHDRAWN OR MODIFIED, AND STATES IN FIVE
REGIONS ISSUED PERMITS FOR EIGHT NEW WELLS AND SEVEN EXISTING WELLS.
THE STATES IN REGIONS IV AND VI DID THE BULK OF THE WORK.
-------
UIC CLASS I WELLS WITH HAZARDOUS WASTE INJECTED
O FOR FY 1988, OW IS TRACKING UIC CLASS I WELLS WHERE HAZARDOUS WASTE
HAS BEEN INJECTED.
CORRECTIVE ACTION PLANS COMPLETED/MEASURES IMPLEMENTED
o BY THE END OF FY 1988, THE PRIMACY STATES COMMIT TO CARRYING OUT
THIS WORK FOR 147 CLASS I WELLS WITH HAZARDOUS WASTE, PRIMARILY IN
REGION VI.
o IN THE FIRST QUARTER, THE PRIMACY STATES IN REGION VI DID ALL THE
WORK. THEY COMPLETED CORRECTIVE ACTION PLANS OR IMPLEMENTED
NECESSARY CORRECTIVE ACTION MEASURES FOR 51 WELLS (THEIR TARGET WAS
27) .
-37-
-------
UIC CLASS II. III. AND V WELLS PERMIT DETERMINATIONS
O UIC CLASS II WELLS ARE RELATED TO OIL AND GAS PRODUCTION.
O UIC CLASS III WELLS USE SPECIAL PROCESSES TO EXTRACT MINERALS.
O UIC CLASS V WELLS INJECT FLUID INTO/ABOVE DRINKING WATER SOURCES.
(MOST ARE SHALLOW AND WITH LESS SOPHISTICATED CONSTRUCTION.)
MADE BY EPA
O FOR FY 1988, THE REGIONS TARGETED PERMIT DETERMINATIONS FOR 502 NEW
AND EXISTING CLASS II AND III WELLS.
O AT THE END OF THE SECOND QUARTER, THE REGIONS MADE 240 PERMIT
DETERMINATIONS, ACHIEVING 116% OF THEIR TARGET OF 207. THE TOTAL
INCLUDES 36 PERMIT APPLICATIONS DENIED/WITHDRAWN OR MODIFIED, AND
PERMITS ISSUED FOR 110 NEW AND 84 EXISTING WELLS IN SIX REGIONS.
MADE BY THE PRIMACY STATES
o IN FY 1988, THE PRIMACY STATES PLAN TO MAKE 5,034 PERMIT
DETERMINATIONS OF NEW AND EXISTING CLASS II, III AND V WELLS. (DATA
FOR THIS MEASURE IS LAGGED ONE QUARTER.)
o IN THE FIRST QUARTER, THE PRIMACY STATES MADE 1,956 PERMIT
DETERMINATIONS (OF WHICH 1,300 WERE FOR NEW CLASS II WELLS),
ACHIEVING 168% OF THEIR TARGET OF 1,160.
- THE STATES IN REGION VI MADE OVER HALF OF THE PERMIT
DETERMINATIONS: 1,044 (THEIR TARGET WAS 692).
-------
600r
UIC CLASS II, III AND V PERMIT DETERMINATIONS
(Existing and New)
EPA
As Of March 31, 1008
QUARTERS
BOOO-r
6000--
4000--
2000--
LEGEND
- TARGET
ACTUAL
STATES
As Of December 31, 1987
x*
QUARTERS
DATA FOR STATES LAGGED
ONE QUARTER
DW-2
NUMBER OF EXISTING WELLS
AS OF 10/1/87: 84,852
207,987
-------
UIC CLASS II MECHANICAL INTEGRITY TESTS (HITS)
UIC HITS ARE TO SEE THAT THE WELL CASINGS AND TUBINGS DO NOT LEAK
AND THAT THE FLUID DOES NOT MIGRATE ALONG THE WELL BORE.
ALL EXISTING CLASS II WELLS MUST DEMONSTRATE MECHANICAL INTEGRITY
WITHIN THE FIRST FIVE YEARS, AND EVERY FIVE YEARS THEREAFTER.
VERIFIED BY EPA
o THE REGIONS HAVE TO VERIFY THE MECHANICAL INTEGRITY TESTS OF 10,625
WELLS OVER THE NEXT TWO YEARS.
O FOR FY 1988, EPA TARGETED 3,849 CLASS II MECHANICAL INTEGRITY TESTS.
o BY THE END OF THE SECOND QUARTER, SIX REGIONS VERIFIED 1,751
MECHANICAL INTEGRITY TESTS, 116% OF THEIR TARGET OF 1,497.
VERIFIED BY THE PRIMACY STATES
O THE PRIMACY STATES PLAN TO VERIFY THE MECHANICAL INTEGRITY TESTS OF
18,778 EXISTING CLASS II WELLS IN FY 1988. (DATA FOR THIS MEASURE IS
LAGGED ONE QUARTER.)
o THROUGH THE FIRST QUARTER, THE PRIMACY STATES VERIFIED THE
MECHANICAL INTEGRITY TESTS OF 7,361 WELLS, ACHIEVING 153% OF THEIR
TARGET OF 4,403.
- THE STATES IN REGION VI CARRIED OUT ALMOST HALF OF THE MITS,
4,879, EXCEEDING THEIR TARGET OF 3,395. REGION VI ALSO HAS THE
LARGEST UNIVERSE: 85,933.
-------
UIC CLASS II WELLS MECHANICAL INTEGRITY TESTS
4000-r
EPA
As Of March 31, 1988
QUARTERS
NUMBER OF EXISTING WELLS
AS OF 10/1/87: 27,241
250QOT
20000- -
15000--
10000--
5000- -
LEGEND
- TARGET
STATES
As Of December 31, 1987
DW-3
QUARTERS
141,142
DATA FOR STATES LAGGED
ONE QUARTER
-41-
-------
UNDERGROUND INJECTION CONTROL COMPLIANCE
SIGNIFICANT NONCOMPLIANCE
BASED ON FIELD INSPECTIONS, MITs AND SELF-REPORTING, 9,533 WELLS
WERE IDENTIFIED AS BEING NEWLY IN SNC (6,774 BY THE STATES AND 2,759
BY EPA). LAST QUARTER, THERE WERE 1,609 WELLS IN SNC.
- 8,084 (85%) OF THE WELLS IN SNC ARE IN REGION V.
ADDRESSING SIGNIFICANT NONCOMPLIANCE
AT THE END OF THE FIRST QUARTER FY 1988, THERE WERE 1,633 WELLS IN
SNC INCLUDING ONE WELL IN SNC FOR TWO OR MORE QUARTERS. AT THE
END OF THE SECOND QUARTER FY 1988, 1,614 WERE EITHER RETURNED TO
COMPLIANCE OR ADDRESSED BY ENFORCEMENT ACTIONS. OF THE 9,533
CURRENTLY IN SNC, 116 (115 IN REGION V) HAVE BEEN IN SNC FOR TWO OR
MORE QUARTERS.
ENFORCEMENT ACTIONS
THROUGH THE SECOND QUARTER, THE REGIONS HAVE ISSUED 24 PROPOSED AND
39 FINAL ADMINISTRATIVE ORDERS. THE STATES HAVE ISSUED 188 FINAL
ORDERS (42 THIS QUARTER).
THROUGH THE SECOND QUARTER, THE STATES HAVE REFERRED TWO CIVIL CASES
(ONE THIS QUARTER) TO STATE ATTORNEYS GENERAL AND HAVE FILED ONE
CRIMINAL ACTION IN STATE COURTS.
FIELD INSPECTIONS
NATIONALLY, EPA AND THE STATES EXCEEDED THEIR TARGETS FOR FIELD
INSPECTIONS. EPA CONDUCTED 6,033 FIELD INSPECTIONS AGAINST A TARGET
OF 3,784 FOR 160% OF TARGET AND THE STATES CONDUCTED 20,768 AGAINST
A TARGET OF 11,635 FOR 178% OF TARGET.
-------
PUBLIC WATER SYSTEMS COMPLIANCE
FOR THE 12 MONTHS ENDING DECEMBER 31, 1987, LESS THAN TWO PERCENT
(856 OF 58,873) OF COMMUNITY WATER SYSTEMS WERE IN SIGNIFICANT NON-
COMPLIANCE (SNC) WITH MICROBIOLOGICAL OR TURBIDITY MAXIMUM CONTAMI-
NANT LEVELS (MCLs) AND/OR MONITORING AND REPORTING (M&R) REQUIREMENTS
AND/OR TOTAL TRIHALOMETHANE (TTHM) M&R REQUIREMENTS.. THE REMAINING
58,017 SYSTEMS WERE EITHER IN FULL COMPLIANCE OR HAD VIOLATIONS OTHER
THAN SNC.
NOTE: STATE DATA IS LAGGED ONE QUARTER
-43-
-------
PUBLIC WATER SUPPLY ENFORCEMENT
ADDRESSING NONCOMPLIANCE
MICROBIOLOGICAL. TURBIDITY MCLs AND MONITORING/REPORTING AND
TTHM MONITORING AND REPORTING
AT THE END OF THE FIRST QUARTER 1988, THERE WERE 993 COMMUNITY
WATER SYSTEMS (CWS) IN SNC WITH THESE REQUIREMENTS. SINCE THEN
171 HAVE BEEN RETURNED TO COMPLIANCE AND 159 OTHERS HAVE BEEN
ADDRESSED BY AN ENFORCEMENT ACTION LEAVING AN UNADDRESSED BALANCE
OF 663 CWS (1.1% OF ALL CWS). LAST QUARTER THERE WERE 635
UNADDRESSED.
CHEMICAL. RADIOLOGICAL AND TTHM (MCL ONLY)
MCLs AND MONITORING/REPORTING
AT THE END OF THE SECOND QUARTER FY 1987, THERE WERE 3,170 CWS IN
SNC. SINCE THEN 948 HAVE BEEN RETURNED TO COMPLIANCE AND 305
OTHERS HAVE BEEN ADDRESSED BY AN ENFORCEMENT ACTION LEAVING 1,917
UNADDRESSED (60% OF THE FIXED BASE). LAST QUARTER THERE WERE
2,082 CWS UNADDRESSED.
ENFORCEMENT ACTIVITY
BY THE END OF THE SECOND QUARTER, THE REGIONS HAD ISSUED 93
PROPOSED AND 68 FINAL ADMINISTRATIVE ORDERS. THE REGIONS ALSO
HAVE REFERRED THREE CIVIL CASES.
THE STATES HAVE ISSUED 252 (123 IN THE SECOND QUARTER) FINAL
ADMINISTRATIVE/COMPLIANCE ORDERS AND HAD REFERRED 100 CIVIL CASES
(56 IN THE SECOND QUARTER) TO STATE ATTORNEYS GENERAL. A STATE
EACH IN REGIONS III AND IV HAD ONE CRIMINAL REFERRAL A PIECE FILED
IN STATE COURTS.
NOTE: STATE DATA IS LAGGED ONE QUARTER
-------
120QT
1000--
N
U
M
B
E
R
BOO--
600--
400-
200 -
PUBLIC WATER SYSTEMS
RESPONSE TO SNC
As Of September 30, 1987
EXCEPTIONS REPORT
FIXED BASE
3200T
2400-
N
U
M
B
E
R
1600--
800-
SNC RETURN TO ENFORCEMENT PENDING
COMPLIANCE ACTIONS
SNC RETURN TO ENFORCEMENT PENDING
COMPLIANCE ACTIONS
DW/E-2.3,4
-45-
-------
GROUNDWATER SOLE SOURCE AQUIFER DESIGNATION
SOLE SOURCE AQUIFER (SSA) DESIGNATIONS WERE DEVELOPED TO PROTECT AN
AREA'S ONLY OR PRINCIPAL SOURCE OF DRINKING WATER. THIS PROGRAM WAS
INITIATED IN THE SAFE DRINKING WATER ACT (SDWA) OF 1974 AND
STRENGTHENED IN THE SDWA AMENDMENTS OF 1986.
UNDER GUIDANCE DEVELOPED TO CARRY OUT THE SDWA AMENDMENTS, THE
REGIONS HAVE THE RESPONSIBILITY TO REVIEW PETITIONS FOR SOLE SOURCE
AQUIFER DESIGNATIONS, AND MAKE DETERMINATIONS TO APPROVE, DENY, OR
RETURN INCOMPLETE PETITIONS TO THE APPLICANT.
O TO DATE, 31 SOLE SOURCE AQUIFERS HAVE BEEN DESIGNATED.
o IN FY 1988, 10 PETITIONS FOR SSA DESIGNATIONS HAVE BEEN RECEIVED:
FOUR IN REGION V, AND TWO EACH IN REGIONS I, VIII, AND X.
O FROM AMONG THESE AND PREVIOUSLY RECEIVED PETITIONS:
- FIVE PETITIONS WERE APPROVED, TWO IN REGION V, AND ONE EACH IN
REGIONS I, II, AND IV;
- ONE PETITION WAS DENIED;
- TEN PETITIONS WERE RETURNED INCOMPLETE TO APPLICANTS.
-------
GROUNDWATER SOLE SOURCE AQUIFER DESIGNATIONS
As Of March 31, 1988
RECEIVED
DENIED
APPROVED
RETURNED
INCOMPLETE
TO APPLICANT
23456789 10
NUMBER OF PETITIONS
TOTAL SSAs DESIGNATED: 31
GW-1
-47-
-------
NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES 1 PERMITS
O THE NPDES PROGRAM STARTED IN 1970. EACH NPDES PERMIT IS EFFECTIVE
FOR UP TO FIVE YEARS. PERMIT APPLICATIONS ARE DUE AND SHOULD BE
ACTED UPON DURING THE LAST SIX MONTHS OF A PERMIT'S TERM. AS A
RESULT OF THE WATER QUALITY ACT, MORE PERMITS WILL HAVE TOXIC
LIMITS. CURRENTLY, ABOUT 7,300 MAJOR FACILITIES HAVE NPDES PERMITS.
MAJOR FACILITIES NPDES REPERMITTING BY EPA
o IN FY 1988, THE REGIONS COMMIT TO REISSUE PERMITS TO 329 OF 400
MAJOR FACILITIES WHOSE PERMITS HAVE EXPIRED OR ARE DUE TO EXPIRE
DURING THE YEAR.
o BY MID-YEAR, THE REGIONS REISSUED 57 PERMITS (INCLUDING 49 WITH
WATER QUALITY LIMITS FOR TOXICS), ACHIEVING 53% OF THEIR TARGET OF
107.
MAJOR FACILITIES NPDES REPERMITTING BY DELEGATED STATES
o IN FY 1988, THE STATES PLAN TO REISSUE PERMITS TO 1,036 OF 1,216
MAJOR FACILITIES WHOSE PERMITS HAVE EXPIRED OR ARE DUE TO EXPIRE
DURING THE YEAR.
o BY THE END OF THE SECOND QUARTER, THE STATES REISSUED 277 PERMITS
(INCLUDING 213 WITH WATER QUALITY LIMITS FOR TOXICS), ACHIEVING 63%
OF THEIR TARGET OF 433.
-------
MAJOR FACILITY NPDES REPERMITTING
As Of March 31, 1988
EPA
STATES
35Ch
300-
N
U
M 250-
E
R
200-
0
F
p 150-
E
R
M 100-
I
T
S
50-
&
1050-,
/
/ 900-
/
/ 750-
/
/
/ 600-
/
7
' 450-
/
s
/ 300-
/
s
s
s' .^^ 15Q'
^^^"""^ i i i i n
m^ III! U
M
/
1
/
/
J
/
/
S
s'
/
/
/
s .S
jS ^.S^
/ ;T
1**^ 1 1 1 1
1234 1234
QUARTERS LEGEND QUARTERS
-* TARPFT
NUMBER WHICH HAVE EXPIRED ' U '
OR WILL EXPIRE BY:
~ ACTUAL
EOY 86 167 572
EOY 87 325 1-16B
EOY 88 4QO 1,216
WQ-1
-49-
-------
RESOLVING EVIDENTIARY HEARING REQUESTS
O EACH FACILITY (MUNICIPAL, INDUSTRIAL, FEDERAL) IN THE NPDES PERMIT
PROCESS MAY REQUEST AN EVIDENTIARY HEARING. AN EVIDENTIARY HEARING
CAN STAY FACILITY COMPLIANCE WITH PERMIT CONDITIONS, AND SO SHOULD
BE EXPEDITIOUSLY RESOLVED.
O AT THE START OF FY 1988, EPA AND THE STATES HAD 195 EVIDENTIARY
HEARING REQUESTS PENDING. EPA AND THE STATES PLAN TO RESOLVE 155 OF
THE 195 PENDING CASES (EPA 15 OF 26, AND THE STATES 140 OF 169).
o BY THE END OF THE SECOND QUARTER, THE REGIONS HAD RESOLVED SEVEN
EVIDENTIARY HEARING REQUESTS AGAINST A TARGET OF THREE (233%).
DELEGATED STATES
o THROUGH THE FIRST HALF OF THE YEAR, THE STATES RESOLVED TEN
EVIDENTIARY HEARING REQUESTS AGAINST A TARGET OF 14 (71%).
o REGION III AND V STATES ARE RESPONSIBLE FOR 79% OF THE NATIONAL
TOTAL OF PENDING REQUESTS WITH 90 (53%) AND 45 (26%) RESPECTIVELY.
- REGION III AND OW HAVE NOT REACHED AGREEMENT ON TARGETS FOR THIS
FISCAL YEAR. REGION III STATES HAVE RESOLVED FOUR EVIDENTIARY
HEARING REQUESTS OUT OF 90 PENDING.
- REGION V STATES (2/8) MISSED THEIR TARGET.
-------
RESOLVING EVIDENTIARY HEARING REQUESTS
As Of March 31, 1988
EPA
QUARTERS
WQ-4
EVIDENTIARY HEARING
REQUEST PENDING
AS OF 10/1/86: 45
10/1/87: 26
140y
120--
100--
80--
60-
40--
20--
TARGET
ACTUAL
STATES
2
QUARTERS
.,
115
169
-51-
-------
NPDES COMPLIANCE STATUS
o NINETY-THREE PERCENT OF THE 3,534 MAJOR INDUSTRIAL FACILITIES ARE
NOT IN SIGNIFICANT NONCOMPLIANCE, THE SAME AS LAST QUARTER'S RATE.
REGIONS IV, VI, VIII, IX AND X HAD OVERALL COMPLIANCE RATES OF 93%
OR BETTER.
O EIGHTY-SEVEN PERCENT OF THE 3,777 MAJOR MUNICIPAL FACILITIES ARE
NOT IN SIGNIFICANT NONCOMPLIANCE COMPARED TO LAST QUARTER'S 87%.
REGIONS IV, VII, VIII, IX AND X HAD OVERALL COMPLIANCE RATES OF 87%
OR BETTER.
NPDES INSPECTION ACTIVITY
o FOR COVERAGE OF MAJOR NPDES FACILITIES, THE REGIONS AND STATES HAVE
INSPECTED 3,643 (126%) MAJOR FACILITIES AGAINST A COMBINED TARGET OF
2,894. REGIONS VI, IX AND X MISSED THEIR TARGETS.
NOTE: DATA REPRESENTS STATUS OF FACILITIES NOT IN SIGNIFICANT NONCOM-
PLIANCE AS OF DECEMBER 31, 1987.
-------
NPDES COMPLIANCE STATUS
As Of December 31, 1987
MAJOR INDUSTRIALS
94%
6%
MAJOR MUNICIPALS
LEGEND
D NOT IN SNC
SNC
87%
13X
WQ/E-1.2
-53-
-------
RESPONSE TO SIGNIFICANT NONCOMPLIANCE
EXCEPTIONS LIST
o THE NUMBER OF MAJOR INDUSTRIAL AND MUNICIPAL FACILITIES IN SNC FOR
TWO OR MORE CONSECUTIVE QUARTERS WITHOUT BEING ADDRESSED OR RETURNED
TO COMPLIANCE REMAINED AT THREE PERCENT OF ALL MAJOR FACILITIES.
THERE ARE 49 FACILITIES (12 INDUSTRIAL AND 37 MUNICIPAL) THAT HAVE
BEEN IN SNC FOR A YEAR OR MORE WITHOUT BEING ADDRESSED. THIS IS A
DECREASE FROM LAST QUARTER'S 53 AND REPRESENTS 22% OF THE EXCEPTIONS
REPORT.
- FOR MAJOR INDUSTRIALS, OF 94 FACILITIES FROM THE PREVIOUS QUARTER'S
EXCEPTIONS LIST, 45 HAVE RETURNED TO COMPLIANCE AND 16 HAVE
ENFORCEMENT ACTIONS INITIATED. THE REMAINING 33 PLUS 27 NEW
SIGNIFICANT VIOLATORS ON THE EXCEPTIONS REPORT CONSTITUTE THE
PENDING BALANCE OF 60. THERE ARE 3,534 MAJOR INDUSTRIALS AND TWO
PERCENT OF THESE ARE PENDING ON THE EXCEPTIONS REPORT, A DECREASE
FROM LAST QUARTER'S THREE PERCENT.
- FOR MAJOR MUNICIPALS, OF 162 FACILITIES FROM THE PREVIOUS QUARTER'S
EXCEPTIONS LIST, 38 HAVE RETURNED TO COMPLIANCE AND 39 HAVE
ENFORCEMENT ACTIONS INITIATED. THE REMAINING 8'5 PLUS 72 NEW
SIGNIFICANT VIOLATORS ON THE EXCEPTIONS REPORT CONSTITUTE THE
PENDING BALANCE OF 157. THERE ARE 3,777 MAJOR MUNICIPALS AND FOUR
PERCENT OF THESE ARE PENDING ON THE EXCEPTIONS REPORT, THE SAME
AS LAST QUARTER.
-------
100T
RESPONSE TO SIGNIFICANT NONCOMPLIANCE
EXCEPTIONS REPORT
As Of March 31, 1988
MAJOR
INDUSTRIALS
SNC RETURNED ENFORCEMENT PENDING
TO ACTIONS
COMPLIANCE
N
U
M
B
E
R
MAJOR
MUNICIPALS
2DDr
150--
100--
50--
SNC RETURNED ENFORCEMENT PENDING
TO ACTIONS
COMPLIANCE
WO/E-4,5.6.7
LEGEND
D SNC 2 CONSECUTIVE QUARTERS
SNC FOR MORE THAN 2 CONSECUTIVE QUARTERS
-S5-
-------
NPDES ENFORCEMENT ACTIVITY
DURING THE SECOND QUARTER, EPA ISSUED 252 (503 CUMULATIVELY)
ADMINISTRATIVE ORDERS, COMPARED TO 241 DURING THE SAME QUARTER LAST
YEAR. THE STATES ISSUED 278 AOs (426 CUMULATIVELY), COMPARED TO
402 DURING THE SAME QUARTER LAST YEAR.
DURING THE SECOND QUARTER, THE REGIONS REFERRED 25 CIVIL CASES
(40 FOR THE YEAR) COMPARED TO 17 LAST YEAR. THE STATES REFERRED
201 CIVIL CASES (273 CUMULATIVELY), COMPARED TO 69 AT THIS TIME LAST
YEAR.
REGIONS II, III, AND IX EACH HAD A CRIMINAL REFERRAL IN THE SECOND
QUARTER. NATIONALLY, THERE HAVE BEEN FIVE CRIMINAL REFERRALS FOR
THE YEAR.
-------
500T
NPDES ENFORCEMENT ACTIVITY
As Of March 31, 1988
ADMINISTRATIVE ORDERS
2 3
QUARTERS
225T
WQ/E-10,11
LEGEND
EPA
E3 STATES
CIVIL REFERRALS
2 3
QUARTERS
-57-
-------
STATUS OF MAJOR NPDES FEDERAL FACILITIES
o EIGHTY-FIVE PERCENT OF THE 155 MAJOR FEDERAL FACILITIES ARE NOT IN
SIGNIFICANT NONCOMPLIANCE.
o OF THE FIVE FEDERAL FACILITIES FROM THE LAST QUARTER'S EXCEPTIONS
LIST, ONE WAS RETURNED TO COMPLIANCE AND ONE HAD AN ENFORCEMENT
ACTION INITIATED. THE REMAINING THREE PLUS FOUR NEW SIGNIFICANT
VIOLATORS ON THE EXCEPTIONS REPORT CONSTITUTE THE PENDING BALANCE OF
SEVEN FACILITIES. FIVE PERCENT OF ALL MAJOR FEDERAL FACILITIES ARE
PENDING ON THE EXCEPTIONS REPORT, THE SAME RATE AS REPORTED LAST
QUARTER. THERE ARE TWO FACILITIES THAT HAVE BEEN IN SNC FOR FOUR OR
MORE QUARTERS.
-------
STATUS OF MAJOR NPDES FEDERAL FACILITIES
As Of March 31, 1988
COMPLIANCE STATUS
LEGEND
D NOT IN SNC B5X
SNC
15X
1QT
8
N
U
M
B
E
R
6--
RESPONSE TO NEW VIOLATIONS
DYNAMIC BASE
WQ/E-3,7.8.9
SNC RETURNED ENFORCEMENT PENDING
TO ACTIONS
COMPLIANCE
LEGEND
D SNC 2 CONSECUTIVE QUARTERS
SNC MORE THAN 2 CONSECUTIVE QUARTERS
-59-
-------
MUNICIPAL PRETREATMENT PROGRAM AUDITS AND INSPECTIONS
O THERE ARE 1,401 APPROVED MUNICIPAL PRETREATMENT PROGRAMS (637 IN THE
REGIONS AND 764 IN THE STATES).
AUDITS
O TWENTY-TWO % OF THE MUNICIPAL PRETREATMENT PROGRAMS (149 IN THE
REGIONS AND 166 IN THE STATES) ARE TO BE AUDITED DURING FY 1988.
o THROUGH THE SECOND QUARTER, THE REGIONS AUDITED 67 MUNICIPAL
PRETREATMENT PROGRAMS (EXCEEDING THEIR TARGET OF 65), AND THE STATES
AUDITED 66 MUNICIPAL PRETREATMENT PROGRAMS (EXCEEDING THEIR TARGET
OF 64).
INSPECTIONS
o SEVENTY-FIVE % OF THE MUNICIPAL PRETREATMENT PROGRAMS (334 IN THE
REGIONS AND 712 IN THE STATES) ARE TO BE INSPECTED DURING FY 1988.
o BY THE END OF THE SECOND QUARTER, THE REGIONS INSPECTED 138
MUNICIPAL PRETREATMENT PROGRAMS, 112% OF THEIR TARGET OF 123.
o THROUGH THE SECOND QUARTER, THE STATES HAD INSPECTED 240 MUNICIPAL
PRETREATMENT PROGRAMS, 84% OF THEIR TARGET OF 286.
-------
A
U
0
I
T
S
160T
120--
80
LOCAL PRETREATMENT PROGRAM AUDITS
As Of March 31, 1988
EPA
1BQT
QUARTERS
EPA
135--
A
U
D
I
T
S
90
45
LEGEND
TARGET
- ATTIIAI
1 2
QUARTERS
STATES
2
QUARTERS
STATES
1
N
S
p
E
C
T
1
0
N
S
CULT
600-
400-
200-
rv
m
/
/
X
X
X
X
^^^
^s"^
.X*^ i 1. l 1 1
12
QUARTERS
WQ-5
-61-
-------
MUNICIPAL PRETREATMENT PROGRAM ADEQUATE CONTROL MECHANISMS
o POTWs WHICH HAVE HAD PRETREATMENT PROGRAMS FOR SEVERAL YEARS SHOULD
HAVE ADEQUATE CONTROL MECHANISMS INSTALLED FOR 95% OF SIGNIFICANT
INDUSTRIAL USERS OVER THE NEXT TWO YEARS. HALF OF THE PROGRAMS
SHOULD BE REVIEWED IN FY 1988, AND HALF IN FY 1989.
o POTWs WILL BE INCLUDED IF THEY HAVE ADEQUATE CONTROL MECHANISMS
(E.G. LOCAL LIMITS) OR AN ENFORCEABLE SCHEDULE.
o BY THE END OF THE YEAR, EPA PLANS TO REVIEW 318 OF 635 MUNICIPAL
PRETREATMENT PROGRAMS, AND THE STATES PLAN TO REVIEW 371 OF 769.
EPA
O THROUGH THE FIRST HALF OF THE YEAR, THE REGIONS HAD DETERMINED THAT
186 MUNICIPAL PRETREATMENT PROGRAMS HAD ADEQUATE CONTROL MECHANISMS,
160% OF THEIR TARGET OF 116.
APPROVED PRETREATMENT STATES
o BY THE END OF THE SECOND QUARTER, THE STATES HAD DETERMINED THAT 325
MUNICIPAL PRETREATMENT PROGRAMS HAD ADEQUATE CONTROL MECHANISMS,
203% OF THEIR TARGET OF 160.
-------
PRETREATMENT POTWs WITH ADEQUATE CONTROL MECHANISMS
As Of March 31, 1988
EPA
STATES
N
U
M
B
E
R
0
F
A
U
D
T
S
350-r
300--
250--
200--
150--
42 Or
100-
NUMBER OF APPROVED
PRETREATMENT PROGRAMS
AS OF 10/1/87: 635
769
WQ-6
-------
PRETREATMENT COMPLIANCE
O THIS YEAR OW IS TRACKING APPROVED POTW PRETREATMENT PROGRAMS WHERE
POTWs HAVE FAILED TO IMPLEMENT A SIGNIFICANT ASPECT OF THEIR PERMIT/
PRETREATMENT PROGRAM. THIS REPORTABLE NONCOMPLIANCE (RNC) IS
DISCOVERED THROUGH INSPECTIONS, AUDITS AND POTW REPORTS.
O EPA AND STATES CONDUCTED 501 PRETREATMENT AUDITS AND INSPECTIONS
DURING THE PERIOD OF JULY 1987 THROUGH DECEMBER 1987. THROUGH THIS
EFFORT, THE REGIONS IDENTIFIED 90 POTW PRETREATMENT PROGRAMS AS
MEETING THE CRITERIA FOR RNC.
- 34 OF THESE FACILITIES HAVE BEEN ADDRESSED BY AN ENFORCEMENT ACTION,
6 HAVE BEEN ADDRESSED THROUGH TECHNICAL ASSISTANCE.
o THROUGH THE SECOND QUARTER, EPA HAS ISSUED 73 AOs AND THE STATES
24 AOs TO POTWs FOR PRETREATMENT VIOLATIONS.
o EPA HAS INITIATED FIVE CIVIL REFERRALS FOR PRETREATMENT VIOLATIONS
WHILE THE STATES HAVE SENT SIX TO THEIR STATE ATTORNEYS GENERAL.
-------
REPORTABLE NONCOMPUANCE IN THE PRETREATMENT PROGRAM
As Of March 31, 1988
25-r
II
m
IV
WQ/E-12
V VI
REGIONS
LEGEND
D RNC
ADDRESSED
-65-
-------
NATIONAL MUNICIPAL POLICY TMPT.KMENTATION
O THE GOAL OF THE NATIONAL MUNICIPAL POLICY, ISSUED JANUARY 30, 1984,
IS TO HAVE ALL POTWs ACHIEVE SECONDARY OR BETTER WASTEWATER
TREATMENT BY JULY 1, 1988.
o OF THE NEARLY 3,700 MAJOR POTWs (OVER ONE MILLION GALLONS PER DAY),
1,485 HAD NOT ACHIEVED THAT GOAL WHEN THE NMP WAS ISSUED.
O FOR THE PROGRAM TO DATE, OF THESE 1,485 MAJOR FACILITIES:
- 639 HAD CONSTRUCTION COMPLETED, 655 WERE PUT ON ENFORCEABLE
SCHEDULES, AND 171 WERE REFERRED FOR CIVIL ACTION;
- ONLY 20 WERE NOT ON SCHEDULES BECAUSE THEY WERE:
- REQUESTING ง301(h) WAIVERS FOR OCEAN OUTFALLS (14), OR
- DISPUTING A WATER QUALITY STUDY/WASTE LOAD ALLOCATION (6).
O WITH VIRTUALLY ALL MAJOR POTWs BUILT OR IN VARIOUS STAGES OF
CONSTRUCTION, OW'S FOCUS IN FY 1988 IS ON:
- ENFORCING SCHEDULES FOR MAJOR POTWs (THREE ENFORCEMENT ACTIONS
AGAINST 170 FACILITIES IN SNC WITH MCP SCHEDULES BY THE END OF
THIS QUARTER), AND
- PLACING MINOR POTWs ON ENFORCEABLE SCHEDULES.
MINOR MUNICIPAL FACILITIES REQUIRING CONSTRUCTION
O MINOR MUNICIPAL FACILITIES REQUIRING CONSTRUCTION DECREASED FROM
3,361 IN FY 1986, TO 945 IN FY 1987, TO 333 IN FY 1988.
o BY THE END OF FY 1988, EPA AND THE STATES PLAN TO PUT 218 OF THE
REMAINING 333 MINOR MUNICIPAL FACILITIES ON ENFORCEABLE SCHEDULES.
O THROUGH THE SECOND QUARTER, EPA AND THE STATES PUT 146 MINOR
MUNICIPAL FACILITIES ON ENFORCEABLE SCHEDULES, 120% OF THEIR TARGET
OF 129. MORE THAN 70% OF THE WORK WAS DONE IN REGION V.
-------
220r
165--
110-
MINOR MUNICIPAL FACILITIES NEEDING CONSTRUCTION
PLACED ON ENFORCEABLE SCHEDULES
As Of March 31, 1988
110
NUMBER OF MINOR
MUNICIPAL FACILITIES
NEEDING CONSTRUCTION 333
WQ-8
LEGEND
- TARGET
ACTUAL
LEGEND
0 TARGET
H ACTUAL
-------
MUNICIPAL POLICY IMPLEMENTATION
STATUS OF MUNICIPAL COMPLIANCE PLANS AS OF MARCH 30, 1988
THERE ARE 790 MAJOR FACILITIES WITH MUNICIPAL COMPLIANCE PLAN
SCHEDULES. OF THIS NUMBER, 170 OR 22% OF THEM ARE IN SNC WITH
THEIR SCHEDULES. LAST QUARTER, 24% OF THE FACILITIES WERE IN SNC,
FIVE ENFORCEMENT ACTIONS HAVE BEEN TAKEN BY EPA AND TWO TAKEN BY
STATES THUSFAR IN FY 1988 TO ADDRESS SIGNIFICANT NONCOMPLIANCE
VIOLATIONS OF MUNICIPAL COMPLIANCE PLANS.
-------
MUNICIPAL COMPLIANCE PLAN
As Of March 31, 1988
100T
p
E
R
C
M M
,p c
[ p
A
N
C
E
75--
50--
Q
REGIONS
TOTAL
FACILITIES
X NATIONAI
26 790
WQ-9.10
LEGEND
% IN SNC WITH MCP SCHEDULES
D *> IN COMPLIANCE WITH MCP SCHEDULES
-69-
-------
STATE NONPOINT SOURCE (NFS) PROGRAMS
ง319 OF THE WATER QUALITY ACT, AS AMENDED, REQUIRES EACH STATE TO
PREPARE AND SUBMIT TO EPA, BY AUGUST 4, 1988, A NFS ASSESSMENT
REPORT, AS WELL AS A NFS MANAGEMENT PROGRAM WHICH ADDRESSES THOSE
NFS IMPACTED WATERS, IDENTIFIED IN THE ASSESSMENT REPORT, WHICH HAVE
BEEN TARGETED FOR CONCERTED ACTION OVER THE NEXT FOUR YEARS.
THE CORE ELEMENTS OF THE NFS ASSESSMENT REPORTS WERE TO BE SUBMITTED
BY THE STATE AS PART OF THEIR ง305(b) REPORTS DUE APRIL 1, 1988. ALL
STATES ARE REQUIRED TO SUBMIT COMPLETED NFS ASSESSMENT AND
MANAGEMENT PROGRAMS BY AUGUST 4, 1988. EPA MUST SUBMIT A NFS REPORT
TO CONGRESS BY JANUARY 1, 1989, SUMMARIZING PROGRESS MADE IN
IMPLEMENTING ง319.
IN FY 1988, OW WILL BE TRACKING PROGRESS TOWARD THESE STATUTORY
REQUIREMENTS.
o BY THE END OF THE SECOND QUARTER, SEVEN STATES IN THREE REGIONS HAD
SUBMITTED ADEQUATE NPS ASSESSMENT REPORTS; THE TARGET WAS EIGHT.
o ALL STATES AND TERRITORIES ARE TARGETED FOR COMPLETION OF THEIR NPS
MANAGEMENT PROGRAMS BY THE END OF THE FOURTH QUARTER OF FY 1988.
-------
STATE NONPOINT SOURCE PROGRAMS
As Of March 31, 1988
ASSESSMENT REPORTS
MANAGEMENT PROGRAMS
DU-
U N
R D 40-
ฐ
R F
Q
0 R
F |
SQ
A ,R 20-
I E
E S
S
1
0.
DU-
X
r"
/
/ 4ฐ-
/
/
/
/
/
/
/
/ 20-
1
'
. i^ III f\.
r
1
1
.
'
1
1
s*
s* ""
1^ - 1 1 1
P f 1 I 1 LTV T j i i
1234 1234
QUARTERS QUARTERS
LEGEND
- TARGET
ACTUAL
WQ-13
-------
STATE TOXIC CONTROL PROGRAMS FOR SURFACE WATERS
o 21 STATES/TERRITORIES PLAN TO INCORPORATE NEW/REVISED EPA NUMERIC
CRITERIA FOR TOXICS BY THE END OF FY 1988.
o THROUGH THE SECOND QUARTER, SEVEN STATES, ONE IN EACH OF SEVEN
REGIONS, HAD INCORPORATED NEW/REVISED NUMERIC CRITERIA FOR TOXICS,
EXCEEDING THE TARGET OF FIVE.
- VIRGINIA, INDIANA, MISSOURI, AND SOUTH DAKOTA COMPLETED THEIR
WORK ON SCHEDULE.
- ARKANSAS, CALIFORNIA, AND WASHINGTON COMPLETED THEIR TRIENNIAL
REVIEWS AHEAD OF SCHEDULE.
- OF THE SIX STATE LISTS AVAILABLE, THE NUMBER OF NEW POLLUTANTS
WITH NUMERIC CRITERIA RANGES FROM EIGHT TO 81.
O TEN STATES/TERRITORIES PLAN TO INCORPORATE NEW/REVISED NARRATIVE
CRITERIA FOR TOXICS BY THE END OF THE YEAR.
- CURRENTLY, THREE STATES (INDIANA, ARKANSAS, AND MISSOURI) HAVE
DONE SO (THE TARGET WAS TWO).
O 16 STATES/TERRITORIES PLAN TO ADOPT PROCEDURES FOR IMPLEMENTING
NARRATIVE CRITERIA FOR TOXICS BY THE END OF THE YEAR.
- CURRENTLY, INDIANA AND NEW MEXICO HAVE DONE SO (THE TARGET WAS
ONE) .
-------
STATE TOXIC CONTROL PROGRAM FOR SURFACE WATERS
As Of March 31, 1988
NUMERIC DATA
NARRATIVE CRITERIA
21T
14-
7
10T
5-
2 4
QUARTERS
H 0
NARRATIVE CRITERIA
IMPLEMENTING PROCEDURES
16T
12-
2 4
QUARTERS
-\ 0-
QUARTERS
UNIVERSE: 57 STATES AND TERRITORIES
WQ-23
LEGEND
- TARGET
ACTUAL
-73-
-------
STATE WATER QUALITY BASED TOXIC CONTROL PROGRAM REVIEWS
o IN FY 1988, THE REGIONS WILL CONDUCT BROAD, COMPREHENSIVE REVIEWS OF
STATE PROGRAMS FOR IDENTIFYING AND CONTROLLING TOXIC DISCHARGES.
o BASED ON THE PROGRAM REVIEWS AND IDENTIFIED ACTION ITEMS, THE
REGIONS AND STATES WILL DEVELOP FULLY EFFECTIVE PROGRAMS FOR
PROGRESSIVELY ADDRESSING TOXIC POLLUTANTS IN SURFACE WATERS.
o THE REGIONS COMMITTED TO ASSESS 48 OF 56 STATES' AND TERRITORIES'
TOXIC CONTROL PROGRAMS BY THE END OF FY 1988.
o THE REGIONS HAVE COMPLETED 29 COMPREHENSIVE ASSESSMENTS THROUGH THE
SECOND QUARTER AGAINST A TARGET OF 16.
O 50 OF THE 56 STATES AND TERRITORIES COMMITTED TO COMPLETE TOXIC
CONTROL ACTION PLANS BY THE END OF FY 1988.
O BY THE END OF THE SECOND QUARTER, FIVE STATES HAD COMPLETED TOXIC
CONTROL ACTION PLANS AGAINST A TARGET OF SIX.
- DELAWARE, MICHIGAN, AND WISCONSIN COMPLETED TOXIC CONTROL ACTION
PLANS IN THE FIRST QUARTER; MONTANA AND OHIO DID SO THIS QUARTER.
-------
STATES WITH TOXIC CONTROL PROGRAMS FOR SURFACE WATER
As Of March 31, 1988
50r
EPA COMPREHENSIVE
ASSESSMENTS COMPLETED
QUARTERS
STATE ACTION
PLANS DEVELOPED
NUMBER OF STATES
AND TERRITORIES: 56
50-r
40--
N
U
M
B
E 30-1-
R
0
F
P
L
A
N
S
1D--
0-
QUARTERS
LEGEND
- TARGET
ACTUAL
WQ-24.25
-75-
-------
MARINE DISCHARGE PERMITS ISSUED REFLECTING S301(h) DECISIONS
o ง301(h) OF THE CLEAN WATER ACT OF 1972 SAYS THAT PERMITS MAY BE
ISSUED TO POTWs WITH MODIFICATIONS FOR DISCHARGES INTO MARINE
WATERS. THESE PERMITS REQUIRE APPLICABLE WATER QUALITY STANDARDS FOR
SPECIFIC POLLUTANTS; MAINTAINING WATER QUALITY TO PROTECT PUBLIC
WATER SUPPLIES, INDIGENOUS SHELLFISH, FISH, WILDLIFE, AND RECREATION
ACTIVITIES IN AND ON THE WATER; PRETREATMENT; ELIMINATION OF TOXICS;
AND VOLUME CONTROL.
o OUT OF A TOTAL OF 208 PERMIT APPLICATIONS SEVERAL YEARS AGO, 26
REMAIN. OF THESE, 16 ARE TARGETED FOR THE END OF FY 1988.
O THROUGH THE SECOND QUARTER OF FY 1988, REGION I ISSUED ONE PERMIT
AGAINST A NATIONAL TARGET OF TWO.
-------
16-r
14--
U 12
M
B
Eซ10
0
F
P
E
R
M
I
T
S
B--
6--
4--
2--
PERMITS ISSUED REFLECTING
301(h) DECISIONS
As Of March 31, 1988
QUARTERS
UNIVERSE: 26(OUT OF 208 THREE YEARS AGO)
NUMBER OF PERMIT
APPLICATIONS REMAINING
AS OF 10/1/87:26
WQ-14
LEGEND
- TARGET
- ACTUAL
ORIGINAL NUMBER OF
PERMIT APPLICATIONS?OB
-77-
-------
OCEAN DUMPING
O THERE WERE 150-160 SITES PROPOSED FOR OCEAN DUMPING SEVERAL YEARS
AGO. EPA IS WORKING TO COMPLETE ACTIONS ON THESE, TRACKING THREE
STAGES: DRAFT AND FINAL ENVIRONMENTAL IMPACT STATEMENTS, AND SITE
DESIGNATIONS.
DRAFT ENVIRONMENTAL IMPACT STATEMENTS
O BY THE END OF FY 1988, THE REGIONS PLAN TO COMPLETE 13 DRAFT
ENVIRONMENTAL IMPACT STATEMENTS (EISs), OUT OF THE 61 REMAINING.
O THROUGH THE SECOND QUARTER, OUT OF A TARGET OF SEVEN, REGION VI IS
STILL THE ONLY REGION TO HAVE COMPLETED A DRAFT EIS, WHICH WAS DONE
IN THE FIRST QUARTER.
FINAL ENVIRONMENTAL IMPACT STATEMENTS
O BY THE END OF FY 1988, THE REGIONS PLAN TO COMPLETE 15 FINAL EISs,
OUT OF 68 REMAINING.
O BY THE END OF THE SECOND QUARTER, OUT OF FOUR TARGETED, REGION IV
COMPLETED A FINAL EIS, JOINING REGION VI WHICH COMPLETED ONE LAST
QUARTER.
OCEAN DUMPING SITE DESIGNATIONS
o BY THE END OF FY 1988, THE REGIONS PLAN TO DESIGNATE 23 OCEAN
DUMPING SITES, OUT OF 106 REMAINING.
o IN THE FIRST HALF OF THE YEAR, REGIONS II, III, IV, AND VI
DESIGNATED A TOTAL OF NINE OCEAN DUMPING SITES, EXCEEDING THE
NATIONAL TARGET OF THREE.
-------
OCEAN DUMPING SITE DESIGNATION
As Of March 31, 1988
DRAFT ENVIRONMENTAL
IMPACT STATEMENTS
FINAL ENVIRONMENTAL
IMPACT STATEMENTS
SITE DESIGNATIONS
13-
N
U
B 1D
E
R
0
F
S
I 5-
T
E
S
ID-
.
.
/ 10-
y
/
'
/
5-
1
/
/
.
/
/^x^
0.
1234
/ 20
/
1
/ 16
/
/
/ 12
/
/
/ B
I
S A
' ^
/'^^
Xx^***^
1234
*
/
/
/
.
'
1
1
f /
/ '
/ /
/ *
/ /
/ i
I /
Is
r \ i i
1234
QUARTERS QUARTERS QUARTERS
NUMBER OF SITES co 1nR
REQUIRING ACTION: 61 68 iuo
LEGEND
TARGET
ACTUAL
WQ-15
-79-
-------
CONSTRUCTION GRANT PROGRAM
SINCE 1970, THE CONSTRUCTION GRANTS PROGRAM HAS AWARDED OVER 11,000
GRANTS TO MUNICIPALITIES TOTALLING MORE THAN $40 BILLION. DESPITE
CONSIDERABLE PROGRESS, AS OF JANUARY 1986, THERE WERE STILL:
- 140 COMMUNITIES DISCHARGING UNTREATED WASTEWATER,
- 3,100 COMMUNITIES WITH FAILING ONSITE WASTEWATER TREATMENT
PLANTS, AND
- 2,000 COMMUNITIES WITH POTWs PROVIDING ONLY PRIMARY/ADVANCED
PRIMARY WASTEWATER TREATMENT.
THE CONSTRUCTION GRANTS PROGRAM CONTINUES TO PROVIDE FUNDS TO BUILD
POTWs, AS WELL AS TO SUPERVISE THE DEVELOPMENT OF STATE REVOLVING
FUNDS FOR LOANS.
CONSTRUCTION GRANT NET OUTLAYS
o IN FY 1988, EPA HAS TARGETED TO OUTLAY $2,624.5 MILLION FOR THE
CONSTRUCTION GRANTS PROGRAM TO BUILD POTWs.
O IN THE SECOND QUARTER, $1,324.5 MILLION WAS SPENT, 99.1% (WITHIN
THE ACCEPTED +/~ 5% WINDOW) OF THE TARGET OF $1,336.1 MILLION.
-------
3000-r
0-
CONSTRUCTION GRANTS NET OUTLAYS
As Of March 31, 1988
WQ-16
QUARTERS
LEGEND
-- TARGET
- ACTUAL
-81-
-------
CONSTRUCTION GRANTS - BACKLOGGED ADMINISTRATIVE COMPLETIONS
o BACKLOGGED ADMINISTRATIVE COMPLETIONS ARE POTW PROJECTS THAT HAVE
NOT BEEN ADMINISTRATIVELY COMPLETED WITHIN 12 TO 18 MONTHS AFTER IT
HAS INITIATED OPERATION.
o AT THE START OF FY 1988, THERE WERE 2,051 BACKLOGGED ADMINISTRATIVE
COMPLETION PROJECTS (MORE THAN 60% IN REGIONS II, III, AND V).
- THE TOTAL INCLUDES OVER 1,000 PROJECTS WHICH WERE CARRIED OVER TO
THIS YEAR, NOW 24 TO 30 MONTHS IN OPERATION WITHOUT
ADMINISTRATIVE COMPLETION.
- OF THE TOTAL, 1,450 ARE TARGETED FOR COMPLETION BY THE END OF THE
YEAR.
o BY THE END OF THE SECOND QUARTER, THE REGIONS COMPLETED 612
PROJECTS, 94% OF THEIR TARGET OF 650.
- REGIONS II (WITH 536), III (WITH 347), AND V (WITH 366) HAVE THE
LARGEST BACKLOGS. OF THESE, REGION II (98/96) EXCEEDED ITS
TARGET, WHILE REGIONS III (84/92) AND V (148/188) WERE BEHIND
TARGET.
o SEVERAL REGIONS (II AND III IN PARTICULAR) HAVE HAD DIFFICULTY IN
GETTING THEIR STATES TO COMMIT NEEDED RESOURCES TO THE
ADMINISTRATIVE COMPLETION EFFORT.
-------
N
U
M
B
E
R
0
F
C
0
M
P
L
E
T
I
0
N
S
1500-r
1250--
1000--
750--
500-
250-
CONSTRUCTION GRANTS PROJECTS
BACKLOGGED ADMINISTRATIVE COMPLETIONS
As Of March 31, 1988
ADMINISTRATIVE COMPLETION
BACKLOG AS OF 10/1/86: 2.637
10/1/87: 2.051
WQ-18
QUARTERS
LEGEND
- TARGET
- ACTUAL
-83-
-------
CONSTRUCTION GRANTS - NMP PROJECTS INITIATING OPERATION
O NATIONAL MUNICIPAL POLICY (NMP) POTWs ARE TO ACHIEVE SECONDARY OR
BETTER TREATMENT BY JULY 1, 1988.
o BY THE END OF FY 1988, OUT OF 687 POTENTIAL NMP PROJECTS WHICH COULD
START, EPA HAS TARGETED 511 TO INITIATE OPERATION.
o THROUGH THE SECOND QUARTER, 186 NMP PROJECTS HAD INITIATED
OPERATION, 80% OF THE TARGET OF 230.
- REGION V (WITH 182) HAS THE LARGEST NUMBER OF POTENTIAL NMP
PROJECTS WHICH COULD START THIS YEAR; 47 HAVE INITIATED
OPERATION, 82% OF ITS TARGET OF 57.
-------
CONSTRUCTION GRANT NATIONAL MUNICIPAL
POLICY PROJECTS INITIATING OPERATION
As Of March 31, 1988
N
U
M
B
E
R
0
625-r
500--
375--
A
f
g 8 2504-
J s
E
C
T 1254-
PROJECTS PENDING
AS OF 10/1/86: 496
10/1/87: 687
WQ-19
QUARTERS
LEGEND
- TARGET
- ACTUAL
-------
WETLANDS PROTECTION - ACREAGE AT RISK
O IN THE SECOND QUARTER, 7,408 WETLANDS ACRES WERE AT RISK* WITHIN THE
SCOPE OF EPA ACTIVITIES. THE BULK OF THE ACRES AT RISK APPEAR TO BE
IN REGIONS III (4,307) AND V (1,118).
o DURING THE SECOND QUARTER, EPA WAS ABLE TO PREVENT THE LOSS OF 2,930
ACRES, 39% OF THE ACRES AT RISK. MOST OF THIS WAS IN REGIONS III
(861), VI (772), AND IX (785).
O THE REGIONS NOTE THAT THESE NUMBERS ARE ESTIMATES. THERE ARE
PROBLEMS WITH THE DATA BASE FOR SEVERAL REASONS, INCLUDING
DIFFICULTIES WITH THE MEASUREMENT OF ACRES, AND WITH DEFINITIONS OF
WHERE LOSS AVOIDED.
* THE DEFINITION OF "WETLANDS ACRES AT RISK" HAS BEEN REVISED.
CURRENTLY, IT MEANS THOSE ACRES OF WETLANDS AND SPECIAL AQUATIC
SITES IDENTIFIED IN CORPS OF ENGINEERS' PUBLIC NOTICES OF ง404
DREDGE AND FILL PROJECTS WHERE EPA RAISES SIGNIFICANT ISSUES DURING
PERMIT REVIEW.
-------
WETLANDS AND SPECIAL AQUATIC SITE ACRES
As Of March 31, 1988
10000-r
QUARTERS
WQ-20
LEGEND
ACRES AT RISK - 7,408
ACRES LOSS AVOIDED DUE TO EPA - 2,930
-P7-
-------
WETLANDS PROTECTION - ADVANCE IDENTIFICATION
ADVANCE IDENTIFICATION INITIATED
o INITIATING ADVANCE IDENTIFICATION OF WETLANDS AND SPECIAL AQUATIC
SITES INVOLVES GEOGRAPHIC IDENTIFICATION AND MANAGEMENT APPROVAL FOR
PURSUING THE ADVANCE IDENTIFICATION.
o IN FY 1988, THE REGIONS PLAN TO INITIATE 11 ADVANCE IDENTIFICATIONS.
o IN THE SECOND QUARTER, THE REGIONS HAD INITIATED FIVE ADVANCE
IDENTIFICATIONS (THEIR TARGET WAS THREE).
- REGION IV'S SITE IS MAJOR (1,000 OR MORE ACRES), PEARL RIVER, MS.
ADVANCE IDENTIFICATION COMPT.F.TKD
O COMPLETING ADVANCE IDENTIFICATION OF WETLANDS AND SPECIAL AQUATIC
SITES OCCURS WHEN A FINAL DOCUMENT IS SIGNED SPECIFYING THE AREA
SUITABLE OR UNSUITABLE FOR DISCHARGE.
o IN FY 1988, THE REGIONS PLAN TO COMPLETE 15 ADVANCE IDENTIFICATIONS.
o IN THE SECOND QUARTER, THE REGIONS HAD COMPLETED TWO ADVANCE
IDENTIFICATIONS (THEIR TARGET WAS THREE).
- REGION I'S SITE IS MAJOR, ONE-HALF OF YORK COUNTY, MAINE (ABOUT
600,000 ACRES).
- REGION III'S SITE IS MAJOR, CEDAR ISLAND, VA (ABOUT 2,300 ACRES).
-------
12T
10-
WETLANDS AND SPECIAL AQUATIC SITES
ADVANCE INDEMNIFICATION ACTIONS
As Of March 31, 1988
ACTIONS INITIATED
15T
10--
5 -
ACTIONS COMPLETED
QUARTERS
QUARTERS
WQ-21.22
LEGEND
- TARGET
AP.TIIAI
-89-
-------
SECTION 404 ENFORCEMENT
o AT THE BOY, 260 SITES WERE IN SIGNIFICANT VIOLATION. THROUGH THE
SECOND QUARTER AN ADDITIONAL 286 SIGNIFICANT SITES HAVE BEEN IDENTI-
FIED FOR A TOTAL OF 546 SITES TO BE RESOLVED.
O BY THE END OF THE SECOND QUARTER 179 SITES HAVE BEEN RESOLVED
LEAVING 367 SITES REMAINING TO BE RESOLVED.
- 100 SITES WERE RESOLVED BY ENFORCEMENT ACTION.
34 WERE RESOLVED BY VOLUNTARY RESTORATION/CORRECTION.
21 WERE RESOLVED BY CORPS OF ENGINEERS (COE) WITH AFTER-THE-
FACT PERMITS WITH RESTORATION/MITIGATION.
24 WERE RESOLVED BY COE WITH AFTER-THE-FACT PERMITS.
o THROUGH THE SECOND QUARTER, 340 OF THE 546 SITES HAVE RECEIVED AN
ENFORCEMENT ACTION.
O THE REGIONS HAVE CONDUCTED 355 FIELD INVESTIGATIONS.
-------
SECTION 404
PROGRESS IN RESOLVING SIGNIFICANT VIOLATOR SITES
As Of March 31, 1988
600-r
SVs
DETECTED
SVs
RESOLVED
SV8
UNRESOLVED
WQ/E-16
-91-
-------
Office of Solid Waste and Emergency Response
-------
OFFICE OF SOLID WASTE AND EMERGENCY RESPONSE
SECOND QUARTER HIGHLIGHTS
o FOR THE FIFTH CONSECUTIVE QUARTER, THE REGIONS EXCEEDED TARGETS FOR
PRELIMINARY ASSESSMENTS AND SITE INSPECTIONS. IMPORTANT TARGETS FOR
REMEDIAL INVESTIGATION/FEASIBILITY STUDY STARTS, REMEDY SELECTION
AND REMEDIAL ACTION STARTS WERE SUBSTANTIALLY MISSED.
o THE REGIONS HAVE CONTINUED TO MEET AND EXCEED ALL RCRA TARGETS FOR
PERMITTING AND CLOSURE PLAN APPROVALS.
o TO DATE, 172 LAND DISPOSAL FACILITIES AND 59 INCINERATORS HAVE BEEN
PERMITTED, LEAVING 165 LDFs TO BE PERMITTED BY NOVEMBER 1988 AND 145
INCINERATORS TO BE PERMITTED BY NOVEMBER 1989.
o THE UNDERGROUND STORAGE TANKS PROGRAM EXCEEDED ITS TARGET FOR STATES
WITH COOPERATIVE AGREEMENTS IN BOTH FIRST AND SECOND QUARTERS. OVER
5,000 LUST CLEANUPS HAVE BEEN INITIATED SO FAR IN FY 1988.
O CEPP SUBSTANTIALLY MISSED ITS TARGETS FOR CONTINGENCY PLAN
DEVELOPMENT AND CHEMICAL EMERGENCY SIMULATIONS IN BOTH FIRST AND
SECOND QUARTERS.
-95-
-------
PRELIMINARY ASSESSMENTS AND SITE INSPECTIONS
O THE REGIONS COMPLETED 2,189 PRELIMINARY ASSESSMENTS THROUGH THE END
OF THE SECOND QUARTER, FOR 142% OF THE TARGET OF 1,539.
o THE REGIONS COMPLETED 484 SITE INSPECTIONS THROUGH THE END OF THE
SECOND QUARTER, FOR 134% OF THE TARGET OF 360.
O PROGRAM TO DATE, AS OF FEBRUARY 29, THE REGIONS HAD CONDUCTED
PRELIMINARY ASSESSMENTS OF 26,191 SITES. OF THESE, 8,216 (31%) HAVE
HAD SITE INSPECTIONS AND 7,428 (28%) HAVE NO FURTHER FEDERAL ACTION
PLANNED.
REMOVAL ACTIVITIES
O THE REGIONS HAVE INITIATED REMOVAL ACTIONS AT 14 NPL SITES,
EXCEEDING A SECOND QUARTER TARGET OF THREE. NINE OF THESE ACTIONS
WERE FUND-FINANCED. IN ADDITION, 13 SUBSEQUENT (RETURN) ACTIONS
HAVE BEEN INITIATED THROUGH THE SECOND QUARTER, NINE OF WHICH WERE
FUND-FINANCED.
o AT THE END OF SECOND QUARTER, 24 NPL SITES HAD BEEN STABILIZED IN FY
1988 AS A RESULT OF A REMOVAL ACTION, 19 (79%) OF WHICH WERE FUND-
FINANCED. THE END OF YEAR TARGET IS 52.
-------
SUPERFUND
PRELIMINARY ASSESSMENTS/SITE INSPECTIONS
As Of March 31, 1988
PRELIMINARY ASSESSMENTS
SITE INSPECTIONS
3000-r
QUARTERS
1500-r
1125--
750-
375--
QUARTERS
S/F-1.2
LEGEND
ซ- TARGET
- ACTUAL
_Q"7_
-------
SUPERFUND PROGRESS ON REMEDIAL INVESTIGATIONS/FEASIBILITY STUDIES
REMEDIAL INVESTIGATIONS/FEASIBILITY STUDY (RI/FS) STARTS
o RI/FSs WERE INITIATED AT 34 NPL SITES THROUGH THE SECOND QUARTER,
FOR 52% OF THE TARGET OF 66. OF THESE, 24 (71%) WERE PRP-FINANCED.
o TWENTY-TWO SUBSEQUENT RI/FSs ALSO WERE STARTED, FOR 88% OF THE
TARGET OF 25. FOUR WERE FUNDED BY PRPs.
RECORDS OF DECISION (RODS)
o TWENTY-SIX RODS WERE SIGNED FOR NPL SITES THROUGH THE SECOND
QUARTER, FOR 51% OF THE TARGET OF 51. EIGHT OF THESE RODS WERE
FINANCED BY PRPs. IN ADDITION, TEN SUBSEQUENT RODS HAVE BEEN SIGNED
FOR 63% OF THE TARGET OF 16.
o PROGRAM TO DATE, RODS HAVE BEEN SIGNED FOR ABOUT 262 NPL SITES.
-------
SUPERFUND
PROGRESS ON REMEDIAL INVESTIGATIONS/FEASIBILITY STUDIES
As Of March 31, 1988
FIRST
RI/FS STARTS
120-r
0-
FIRST
ROD DECISIONS
1DD-T
75--
5Q--
25-
S/C-5,6
LEGEND
- TARGET
- ACTUAL
-99-
-------
REMEDIAL ACTION ACTIVITY
O START OF REMEDIAL ACTION. AT THE END OF SECOND QUARTER, THE REGIONS
HAD INITIATED FIVE PRP-FINANCED REMEDIAL ACTION STARTS, MEETING
THEIR TARGET. FOR FUND-FINANCED REMEDIAL ACTION STARTS, THE REGIONS
INITIATED 11 FUND-FINANCED STARTS, MISSING THEIR TARGET OF 23.
o IN ADDITION, THE REGIONS HAVE INITIATED SUBSEQUENT REMEDIAL ACTION
ACTIVITY AT THREE NPL SITES (REGION I, PRP-FINANCED AND REGIONS III
AND VIII, FUND-FINANCED), AGAINST A SECOND QUARTER TARGET OF SEVEN.
O PROGRAM TO DATE, ABOUT 78 FUND-FINANCED ACTIONS HAVE BEEN INITIATED
AND 53 SITES ARE BEING ADDRESSED BY PRPs WHO ARE IN COMPLIANCE WITH
AN AGREEMENT AND HAVE A REMEDIAL DESIGN ACCEPTED.
O COMPLETION OF REMEDIAL CONSTRUCTION. THROUGH THE SECOND QUARTER,
ALL REMEDIAL CONSTRUCTION WAS COMPLETED AT TWO NPL SITES, AGAINST A
TARGET OF THREE. THIS WORK WAS COMPLETED BY REGIONS III AND VI.
o PROGRAM TO DATE, AS OF FEBRUARY 29, 24 NPL SITES HAVE BEEN CLEANED
UP (ALL CONSTRUCTION OPERABLE UNITS AND FINAL CONSTRUCTION
INSPECTIONS ARE COMPLETED).
o DELETION FROM THE NPL. AT THE END OF SECOND QUARTER, THE NPL
DELETION PROCESS HAD BEGUN AT 11 OF 12 TARGETED NPL SITES, NINE OF
WHICH BEGAN IN THE SECOND QUARTER.
o PROGRAM TO DATE, AS OF FEBRUARY 29, 13 SITES HAVE BEEN DELETED FROM
THE NPL.
-------
SUPERFUND REMEDIAL ACTION PROGRESS AT SITES
As Of March 31, 1988
FIRST REMEDIAL
ACTION START (FUND)
ALL REMEDIAL CONSTRUCTION
COMPLETE (PRP & FUND)
BID,
B 40-
E
R
* 30-
0
F 20-
c
| 10-
T
w fV
s
^ r
r * Bi
X
X
X
X
X
v- -""""""" N 6-
B
x B
X ^^_^-^* ฃ
^z^^"^ R
^**^^ ii i i .
^^ 1 2 3 4 g 4-
QUARTERS
S
I
FIRST REMEDIAL T
ACTION START (PRP) | 2-
N on
U 20T
M
B
E
R
o 10-
F
S
I
T
E n.
/
/
/
/
/ a
- X<
/
1
'
/
/
/
/
t
*
/
/
X
X
^/
^, >*
X1
j*
^
.X
yX
/^
/
/
X i i ii
/ 1234
/ QUARTERS
^^^^"
^X""^
-^2^ LEGEND
- __ ^* ^^ i^r , , ,
Lri 1 1 1 1
S 1234
QUARTERS " TARGET
* Sf\ T/ \ "ป7i_\ a ~*~ ftw I UAL
-im-
-------
SUPERFUND ENFORCEMENT ACTIVITY
O SECTION 107 COST RECOVERY ACTIONS - THE REGIONS ARE ON SCHEDULE FOR
MEETING THEIR CUMULATIVE SECOND QUARTER TARGET FOR REFERRING SECTION
107 COST RECOVERY ACTIONS. EIGHTEEN SECTION 107 COST RECOVERY
ACTIONS WERE REFERRED VERSUS A TARGET OF 19. THIRTEEN SECTION 107
ACTIONS WERE REFERRED DURING THE FIRST TWO QUARTERS OF FY 1987.
O SECTION 106 REFERRALS - THERE WAS ONE SECTION 106 REFERRAL MADE
THROUGH THE SECOND QUARTER. ONE SECTION 106 REFERRAL WAS MADE
DURING THE SAME PERIOD LAST YEAR.
O SECTION 106 REMOVAL ORDERS - THROUGH THE SECOND QUARTER, 34 SECTION
106 REMOVAL ORDERS WERE ISSUED, 28 AT NON-NPL SITES AND SIX AT NPL
SITES. NINETEEN REMOVAL ACTIONS WERE ISSUED DURING THE SAME PERIOD
LAST YEAR.
-------
SUPERFUND ENFORCEMENT ACTIVITY
As Of March 31, 1988
SECTION 107
RECOVERY CIVIL REFERRALS
(CUMULATIVE)
234
QUARTERS
25n
20-
N 15
U
M
B
E
R 10
5-
SECTION 106 CIVIL
REFERRALS
(CUMULATIVE)
S/E-2(o)
234
QUARTERS
LEGEND
CUMULATIVE TARGET
CUMULATIVE ACTUAL
35T
SECTION 106
REMOVAL ORDERS
(CUMULATIVE)
23
QUARTERS
-103-
-------
CHEMICAL EMERGENCY PREPAREDNESS AND PREVENTION PROGRAM
O THROUGH SECOND QUARTER, 42 STATES HAD STATE IMPLEMENTATION MEMOS
(SIMs) EITHER IN PLACE OR REVISED, UP FROM 39 IN' FIRST QUARTER.
THESE MEMOS ESTABLISH AND TRACK WORKING RELATIONSHIPS BETWEEN THE
STATES AND EPA, AND IDENTIFY PRIORITY AREAS WHERE CHEMICAL EMERGENCY
PREPAREDNESS (CEP) PLANS WILL BE DEVELOPED AND TESTED. TEN STATES
CURRENTLY INTEND NOT TO COMPLETE A SIM, DOWN FROM 17 IN FIRST
QUARTER.
O NATIONALLY, 15 CEPP PRIORITY AREAS HAVE CONTINGENCY PLANS IN PLACE,
WITH SIMULATIONS COMPLETED. EPA ASSISTED STATES IN 12 TABLE-TOP
AND/OR FIELD SIMULATIONS OF CHEMICAL EMERGENCIES, MISSING ITS TARGET
OF 20 (60%). THE PURPOSE OF THESE SIMULATIONS IS TO TEST COMMUNITY
PREPAREDNESS TO RESPOND TO AN EMERGENCY.
O EPA DIRECTLY ASSISTED IN THE DEVELOPMENT OF 22 CONTINGENCY PLANS,
MISSING THE TARGET OF 38 (57%). DIRECT ASSISTANCE BY EPA INCLUDES
PROVIDING PROGRAMMATIC OR TECHNICAL ASSISTANCE UPON REQUEST BY
STATES TO FACILITATE CONTINGENCY PLAN COMPLETION.
-------
CHEMICAL EMERGENCY SIMULATIONS
As Of March 31, 1988
CEP-3
-------
PERMITTING PROGRESS AT LAND DISPOSAL FACILITIES
o AT THE END OF SECOND QUARTER, THE MULTI-YEAR PERMITTING PLANS ARE
TRACKING PERMITTING PROGRESS AT 337 LAND DISPOSAL FACILITIES (LDFs).
o FINAL DETERMINATIONS: THE REGIONS MADE 48 FINAL LDF PERMIT
DETERMINATIONS THROUGH THE SECOND QUARTER, EXCEEDING THE SECOND
QUARTER TARGET OF 36 (133%). OF THESE, 35 PERMITS WERE ISSUED AND
13 WERE DENIED. PROGRAM TO DATE, THE REGIONS HAVE MADE 172 FINAL
DETERMINATIONS, LEAVING 165 TO BE PERMITTED BY NOVEMBER 1988.
o PUBLIC NOTICES! THE REGIONS ISSUED 42 PUBLIC NOTICES FOR LDFs
THROUGH THE SECOND QUARTER, 39 OF WHICH WERE DRAFT PERMITS AND THREE
WERE NOTICES OF INTENT TO DENY PERMITS.
PROGRESS AT CLOSING LAND DISPOSAL FACILITIES
o THE REGIONS HAVE APPROVED 77 LAND DISPOSAL FACILITY CLOSURE PLANS,
EXCEEDING THE SECOND QUARTER TARGET OF 59 (131%).
i
o THROUGH THE SECOND QUARTER, THE REGIONS ISSUED 66 NOTICES OF CLOSURE
PLAN AVAILABILITY FOR LDFs.
o AT THE END OF THE SECOND QUARTER, THERE WERE ABOUT 1200 LDFs ON THE
CLOSURE TRACK. TO DATE, CLOSURE PLANS HAVE BEEN APPROVED FOR 674 OF
-------
PERMITTING PROGRESS AT LAND DISPOSAL FACILITIES
As Of March 31, 1988
PROGRESS TO DATE
FINAL LDF PERMIT DETERMINATIONS
N
u
M
B
E
0
F
P
R
M
T
1 /*i-i
ปJ / bJ
117
J J /
300-
D
E
T
1
^
R 225-
M
1
N
A
T
; 1 50-
i
0
N
SI ft K]
1 UJ
75
FACIUTIES SEEKING PERMITS BY 11/88
MC
XX
X
X
^
^00*^* ****
^*******^ **"
^*****^ -****11*
-^^*-- "" """ *"
jฃ*f^'~
DETERMINATIONS MADE PRIOR TO FY 1988
I 1 I 1
1234
QUARTERS
175-r
R/C-1(d)&(e)
LEGEND
TARGET
- ACTUAL
LAND DISPOSAL FACILITIES
CLOSURE PLANS APPROVED
1 2
QUARTERS
R/C-1(f)
-------
PERMITTING PROGRESS AT INCINERATORS
o EIGHT PERMIT DETERMINATIONS FOR INCINERATORS WERE MADE THROUGH THE
SECOND QUARTER, EXCEEDING THE TARGET OF SIX.
- 7 PERMITS HAVE BEEN ISSUED.
- 1 PERMIT HAS BEEN DENIED.
TO DATE, THE REGIONS HAVE MADE 59 FINAL DETERMINATIONS.
145 INCINERATORS REMAIN TO BE PERMITTED BY NOVEMBER 1989.
O IN ADDITION, 16 DRAFT PERMIT DETERMINATIONS WERE ISSUED THROUGH
SECOND QUARTER. FOURTEEN OF THESE WERE DRAFT PERMITS AND TWO WERE
DRAFT DENIALS.
PROGRESS AT CLOSING INCINERATORS
o THROUGH THE SECOND QUARTER, FOUR INCINERATOR CLOSURE PLANS WERE
APPROVED EXCEEDING THE TARGET OF ONE.
O IN ADDITION, FOUR PUBLIC NOTICES OF CLOSURE PLAN AVAILABILITY WERE
ISSUED.
-------
PERMITTING PROGRESS AT INCINERATORS
As Of March 31, 1988
INCINERATOR
FINAL PERMIT DETERMINATIONS
35r
M
01 Q2 03
QUARTERS
INCINERATOR
CLOSURE PLANS APPROVED
01 02 03
QUARTERS
LEGEND
R/C-1(d&e),1(f)
TARGET
ACTUAL
-109-
-------
PERMITTING PROGRESS AT STORAGE AND TREATMENT FACILITIES
O THIRTY FINAL PERMIT DETERMINATIONS FOR STORAGE/TREATMENT FACILITIES
WERE MADE THROUGH SECOND QUARTER:
- 27 PERMITS HAVE BEEN ISSUED.
- 3 PERMITS HAVE BEEN DENIED.
o AT THE END OF SECOND QUARTER, THERE WERE ABOUT 1400 STORAGE/
TREATMENT FACILITIES SEEKING PERMITS. TO DATE, THE REGIONS HAVE MADE
510 FINAL PERMIT DETERMINATIONS.
O THROUGH SECOND QUARTER, THE REGIONS ISSUED 28 DRAFT PERMIT
DETERMINATIONS FOR STORAGE/TREATMENT FACILITIES, 26 OF THESE WERE
DRAFT PERMITS.
PROGRESS AT CLOSING FACILITIES
o THROUGH THE SECOND QUARTER, THE REGIONS HAVE APPROVED 90 CLOSURE
PLANS AND HAVE ISSUED 81 STORAGE/TREATMENT NOTICES OF CLOSURE PLAN
AVAILABILITY.
O AT THE END OF SECOND QUARTER, THERE WERE ABOUT 420 CLOSING
FACILITIES. TO DATE, THE REGIONS HAVE APPROVED 238 CLOSURE PLANS.
-------
CORRECTIVE ACTION ACTIVITY
o CORRECTIVE ACTION ACTIVITIES MAY BE CONDUCTED DURING INTERIM STATUS,
PERMITTING, AND CLOSURE STAGES. THIS MEASURE TRACKS THE MAJOR STEPS
IN THE CORRECTIVE ACTION PROCESS.
o THROUGH THE SECOND QUARTER, THE REGIONS COMPLETED RCRA FACILITY
ASSESSMENTS (RFAs) AT 164 FACILITIES.
o REMEDIAL INVESTIGATIONS WERE IMPOSED FOR 62 SITUATIONS REQUIRING
CORRECTIVE ACTION.
o THERE WERE NO CORRECTIVE ACTION REMEDIES SELECTED NOR ANY CORRECTIVE
ACTION DESIGNS APPROVED IN THE SECOND QUARTER.
WAIVER REQUESTS
o THIS SPMS MEASURE TRACKS DECISIONS MADE ON WAIVER REQUESTS FOR ACLs,
DOUBLE-LINER WAIVERS, AND/OR TANK SECONDARY CONTAINMENT WAIVERS.
o FIVE WAIVER REQUESTS WERE GRANTED THROUGH THE SECOND QUARTER AND TWO
WERE DENIED.
-------
RCRA INSPECTIONS OF LAND DISPOSAL FACILITIES
o EPA AND THE STATES SURPASSED THEIR CUMULATIVE SECOND QUARTER TARGET
FOR INSPECTIONS OF LAND DISPOSAL FACILITIES BY CONDUCTING 543 (113%)
INSPECTIONS VERSUS A TARGET OF 482.
RCRA INSPECTIONS OF TREATMENT AND STORAGE FACILITIES
o EPA AND THE STATES SURPASSED THEIR CUMULATIVE SECOND QUARTER TARGET
FOR INSPECTIONS OF TREATMENT AND STORAGE FACILITIES BY CONDUCTING
929 (128%) VERSUS A TARGET OF 723.
RCRA INSPECTIONS OF FEDERAL, STATE, AND LOCAL GOVERNMENT TSDF's
(EPA ONLY)
O THE EPA REGIONS SURPASSED THEIR CUMULATIVE SECOND QUARTER TARGET OF
152 BY CONDUCTING 181 (119%) INSPECTIONS OF FEDERAL, STATE, AND LOCAL
TSDF's.
-------
RCRA INSPECTIONS OF LAND DISPOSAL FACILITIES
As Of March 31, 1988
125
i n ra iv
R/E-2(a)
V VI
REGIONS
LEGEND
EPA it STATES
VII
125+
TARGET
NATIONAL
LEVELS
-------
RCRA - PROGRESS ON ADDRESSING LAND DISPOSAL FACILITIES
IN SIGNIFICANT NONCOMPLIANCE
o THE RCRA ENFORCEMENT PROGRAM HAS IDENTIFIED 707 LAND DISPOSAL
FACILITIES AS SIGNIFICANT NONCOMPLIERS, WITH 559 HAVING HAD FORMAL
ENFORCEMENT ACTION INITIATED PRIOR TO THE BEGINNING OF FY 1988. OF
THE REMAINING 148 SNC's, 145 ARE TARGETED TO BE ADDRESSED THROUGH
FORMAL ACTION OR RETURNED TO COMPLIANCE BY THE END OF THE YEAR.
O THE PROGRAM IS ON SCHEDULE FOR MEETING ITS END-OF-YEAR GOAL FOR
ADDRESSING SNC's. SIXTY-ONE SNC's WERE PENDING AT THE END OF THE
SECOND QUARTER AGAINST THE PROGRAM GOAL OF HAVING 60 PENDING.
O THE DISTRIBUTION OF THE 707 SNC's IN THE FIXED BASE AT THE END OF
THE SECOND QUARTER IS AS FOLLOWS:
45 (4%) HAVE BEEN RETURNED TO PHYSICAL COMPLIANCE;
- 255 (37%) ARE UNDER A FINAL, EFFECTIVE ADMINISTRATIVE ORDER,
COURT JUDGMENT OR CONSENT DECREE)
- 346 (46%) HAVE RECEIVED AN INITIAL ADMINISTRATIVE OR JUDICIAL
COMPLAINT; AND,
61 (14%) ARE PENDING.
-------
RCRA - PROGRESS ON ADDRESSING
LAND DISPOSAL FACILITIES IN SIGNIFICANT NONCOMPUANCE
As Of March 31, 1988
Reduction of Fixed Base
(Pending As Of October 1, 1987)
BDQT
TARGET
-t-
BOY
R/E-4(e)
QUARTERS
LEGEND
D RETURNED TO COMPLIANCE
El ON COMPLIANCE SCHEDULES
0 INITIAL ENFORCEMENT ACTION TAKEN
PENDING
-------
RCRA ENFORCEMENT ACTIVITY
FORMAL ADMINISTRATIVE ACTIONS
o THROUGH THE SECOND QUARTER, THE EPA REGIONS ISSUED 129 FORMAL ADMIN-
ISTRATIVE ACTIONS TO TSDF's COMPARED TO 83 THROUGH THE SECOND QUARTER
OF FY 1987.
O THE STATES ISSUED 279 FORMAL ADMINISTRATIVE ACTIONS TO TSDF's THROUGH
THE SECOND QUARTER COMPARED TO 187 THROUGH THE SECOND QUARTER OF
FY 1987.
CIVIL ACTIONS
THE EPA REGIONS REFERRED FOUR CIVIL ACTIONS UNDER RCRA COMPARED TO
10 IN THE FIRST TWO QUARTERS OF FY 1987.
CRIMINAL REFERRALS
O THE EPA REGIONS REFERRED TWELVE CRIMINAL ACTIONS UNDER RCRA DURING
THE FIRST TWO QUARTERS COMPARED TO SEVEN FOR THE SAME PERIOD LAST
YEAR.
-------
500-r
RCRA ENFORCEMENT ACTIVITY
As Of March 31, 1988
ADMINISTRATIVE COMPLAINTS
ISSUED TO TSDF's
2 3
QUARTERS
R/E-6
LEGEND
LI STATES
EPA
-------
RCRA FEDERAL FACILITIES STATUS
PROGRESS AGAINST SIGNIFICANT NONCOMPLIANCE
FORTY-FIVE FACILITIES WERE REPORTED AS BEING IN SIGNIFICANT NONCOM-
PLIANCE AT THE END OF THE SECOND QUARTER. OF THESE, 31 HAVE BEEN
ADDRESSED WITH FORMAL ENFORCEMENT ACTIONS.
-------
RCRA - FEDERAL FACILITIES STATUS
As Of March 31, 1988
PROGRESS AGAINST SNC
R/E-5A
LEGEND
# SNC/END OF QUARTER/UNADDRESSED
# SNC/END OF QUARTER/ADDRESSED
-------
UNDERGROUND STORAGE TANKS STATE PROGRAM
O THE UNDERGROUND STORAGE TANK (UST) STATE PROGRAM APPROVAL HELPS
TRACK STATES' READINESS FOR THE FINAL UST TECHNICAL STANDARDS RULE
(RULE DUE JULY 15). IN SECOND QUARTER, THERE WERE 27 STATES WITH
ADEQUATE LEGISLATION FOR DEVELOPING AN APPROVABLE UNDERGROUND
STORAGE TANK PROGRAM THAT ADDRESSES TECHNICAL STANDARDS, TWO FEWER
THAN IN FIRST QUARTER.
O FOURTEEN STATES HAD THE LEGISLATIVE AUTHORITY TO DEVELOP AN
APPROVABLE UST PROGRAM THAT ADDRESSES THE REQUIREMENTS FOR FINANCIAL
ASSURANCE OF OWNERS OF PETROLEUM TANKS, THREE FEWER THAN IN FIRST
QUARTER.
-------
STATUS OF UST TECHNICAL STANDARDS REGULATION
O THE TARGET DATE TO PUBLISH THE UST REGULATION HAS BEEN CHANGED TO
JULY 15, 1988 (FORMERLY, MAY 31). THE FEDERAL INTERIM PROHIBITION
IS EXPECTED TO END IN SEPTEMBER 1988 (FORMERLY, JULY).
ENFORCEMENT OF INTERIM PROHIBITION
THE INTERIM PROHIBITION PROVIDES ENFORCEABLE UST STANDARDS UNTIL THE
RULE IS PUBLISHED. IN FY 1988 SO FAR:
O THERE WERE 1,317 FACILITIES IDENTIFIED AS BEING IN VIOLATION OF
EITHER THE FEDERAL INTERIM PROHIBITION OR A SIMILAR STATE UST
REGULATION; OF THESE:
- 90% WERE IDENTIFIED IN SECOND QUARTER; AND
- 876 (67%) WERE IN REGION III.
O 205 FACILITIES HAD ENFORCEMENT ACTIONS FILED AGAINST THEM:
- 76% WERE IDENTIFIED IN SECOND QUARTER; AND
- 176 (85%) WERE IN REGION VIII.
o 350 FACILITIES HAVE BEEN RETURNED TO COMPLIANCE:
- 77% WERE IDENTIFIED IN SECOND QUARTER; AND
- 169 (48%) WERE IN REGION IV.
THOSE RETURNED TO COMPLIANCE DID NOT NECESSARILY HAVE ENFORCEMENT
ACTIONS FILED.
-------
CLEANUP OF LEAKING UNDERGROUND STORAGE TANKS
o OF THE THREE CRITERIA NECESSARY TO QUALIFY FOR A LEAKING UNDERGROUND
STORAGE TANK (LUST) COOPERATIVE AGREEMENT, 20 STATES MET ALL THREE
CRITERIA AND HAVE AGREEMENTS, EXCEEDING THE TARGET OF 12 STATES
(133%). THE END OF FY 1988 TARGET FOR THESE AGREEMENTS IS 44
STATES.
o FOR EACH OF THESE THREE CRITERIA SEPARATELY, THERE WERE:
47 STATES WITH THE AUTHORITY FOR CORRECTIVE ACTION;
46 STATES WITH THE AUTHORITY FOR ENFORCEMENT; AND
34 STATES WITH THE AUTHORITY FOR COST RECOVERY.
o FY 1988 YEAR TO DATE, 5,066 SITE CLEANUPS HAVE BEEN INITIATED IN
RESPONSE TO POLLUTION FROM LEAKING UNDERGROUND STORAGE TANKS; HALF
OF THIS TOTAL WERE INITIATED IN FIRST QUARTER, HALF IN SECOND. OUST
REPORTS THAT THIS TOTAL INCLUDES CLEANUPS IN STATES THAT HAVE NO
LUST AGREEMENT WITH EPA.
-------
STATES WITH LUST TRUST FUND
COOPERATIVE AGREEMENTS
As Of March 31, 1988
UST-3A
-------
1327
LUST CLEANUPS INITIATED
As Of March 31, 1988
NATIONAL TOTAL IS 5,066
679
1010
o A
LEGEND
# TOTAL CLEANUPS
I INITIATED PER REGION
UST-3C
-------
Office of Pesticides and Toxic Substances
-------
OFFICE OF PESTICIDES AND TOXIC SUBSTANCES
SECOND QUARTER HIGHLIGHTS
PROGRESS ON REGISTRATION APPLICATIONS HAVE BEEN ABOVE OR NEAR
TARGET.
OVERALL, PESTICIDE REGISTRATION APPLICATION BACKLOG INCREASED FROM
3,062 TO 3,742.
OPTS ISSUED ONE FRSTR DURING SECOND QUARTER. THIS MAKES A TOTAL
OF FIVE FRSTRs ISSUED TO DATE.
OPTS RECEIVED EIGHT VALID BIOTECHNOLOGY NOTICES DURING SECOND
QUARTER.
THE STATES EXCEEDED THEIR FIFRA INSPECTION TARGETS FOR THE
QUARTER.
ONE HUNDRED AND TEN NEW SIGNIFICANT VIOLATORS WERE IDENTIFIED TO
DATE BASED ON FY 88 INSPECTIONS. THE REGIONS SURPASSED THEIR
TARGET BY ADDRESSING 100% OF THE CASES (WHICH HAD ACTION TAKEN) IN
THE ALLOTTED TIME OF WITHIN 180 DAYS OF INSPECTION.
-------
ESTABLISHMENT AND IMPLEMENTATION OF REGISTRATION STANDARDS (RSs)
IN THE SECOND QUARTER:
o FOUR PESTICIDES (ASULAM, MALATHION, MEVINPHOS, AND ALLETHRIN
STEREOISOMERS) ENTERED STAGE 1 (WHEN A LETTER IS SENT TO THE
REGISTRANT TRANSMITTING THE STANDARD AND REQUESTS DATA). IN FY
1988 NINE RSs HAVE ENTERED STAGE 1 AGAINST A CUMULATIVE TARGET OF
EIGHT. THIRTY-TWO RSs ARE IN STAGE 1 AS OF 3/31/88.
o FOURTEEN RSs REACHED STAGE 2 (WHEN EITHER COMMITMENTS FOR ALL
GENERIC DATA REQUIREMENTS HAVE BEEN MET OR SOME TYPE OF ACTION HAS
BEEN INITIATED TO REMOVE FROM THE MARKETPLACE). IN FY 1988 23 RSs
HAVE ENTERED STAGE 2. AGAINST A CUMULATIVE TARGET OF 12. ONE
HUNDRED TEN RSs ARE IN STAGE 2 AS OF 3/31/88.
o TWELVE RSs REACHED STAGE 3 (WHEN ALL DATA TO FULFILL GENERIC DATA
COMMITMENTS HAVE BEEN SUBMITTED AND REMAINS IN THIS STAGE UNTIL A
FRSTR IS ESTABLISHED). TWELVE RSs HAVE ENTERED STAGE 3 IN FY
1988, AGAINST A CUMULATIVE TARGET OF EIGHT. THERE ARE 29 RSs IN
STAGE 3 AS OF 3/31/88.
o ONE FRSTR (METALAXYL) REACHED (STAGE 4) (WHEN A FINAL REGULATORY
POSITION HAS BEEN ESTABLISHED.) OPTS HAS ISSUED TWO FRSTR'S
DURING FY 1988, AGAINST A CUMULATIVE TARGET OF FIVE.
TO DATE, FIVE FRSTRs HAVE BEEN ESTABLISHED: METOLACHLOR,
ALLIETTE, PHOSALONE, METALAXYL, AND SODIUM AND CALCIUM
HYPOCHLORITES.
(P-l)
-------
ESTABLISHMENT AND IMPLEMENTATION OF REGISTRATION
STANDARDS - CUMULATIVE NUMBER OF STANDARDS
As Of March 31, 1988
CURRENT STATUS*
Number of Reg. Standards In each
stage as of 3/31/88
P-1
STAGES
LEGEND
ACTUAL
0 TARGET
-------
PESTICIDE REVIEWS
PESTICIDE SPECIAL REVIEW DECISIONS
OPTS COMPLETED FIVE SPECIAL REVIEW DECISIONS IN THE SECOND QUARTER
MEETING THE CUMULATIVE TARGET OF SEVEN. THE FIVE REVIEW DECISIONS
WERE :
REVIEWS
PENTACHLOROPHENOL
(NON-WOOD)
DDVP
DACTHAL
PROPAZINE
2,4-D
TYPE OF DECISION
AMENDED PD 4
PD 1
NOT TO INITIATE SPECIAL REVIEW
NOT TO INITIATE SPECIAL REVIEW
FR NOTICE
(P-2)
REVIEWS OF STUDIES COMPLETED
IN THE SECOND QUARTER, OPTS COMPLETED 158 REVIEWS. THUS FAR IN FY
1988 OPTS HAS COMPLETED 288 REVIEWS, EXCEEDING THE CUMULATIVE
TARGET OF 220 BY 31%.
(P-3)
-------
PESTICIDE REVIEWS
As Of March 31, 1988
PESTICIDE SPECIAL REVIEW DECISIONS
CUMULATIVE NUMBER OF ACTIONS COMPLETED
15T
REVIEWS OF STUDIES
CUMULATIVE NUMBER OF REVIEWS COMPLETED
SOOT-
QUARTERS
P-2,3
LEGEND
~ TARGET
- ACTUAL
-------
PESTICIDE REGISTRATION APPLICATIONS
OVERALL, OPTS PROGRESS ON REGISTRATION APPLICATIONS HAS BEEN ABOVE
(OR NEAR) TARGET. SPECIFICALLY FOR:
AMENDED REGISTRATIONS 2,093 VS 1,350
NEW USES 64 VS 30
NEW ACTIVE INGREDIENTS 7 VS 5
OLD CHEMICALS 713 VS 720
DESPITE THE ABOVE TARGET PERFORMANCE, THE REGISTRATION BACKLOG
INCREASED FROM 3,062 TO 3,742 DURING THIS FY. THIS COMPARES TO A
REGISTRATION BACKLOG OF 2,403 AT THE END OF SECOND QUARTER, FY
1987.
THE REGISTRATION BACKLOG INCREASED FOR:
NEW USES FROM 41 TO 55 (+34%)
AMENDED REGISTRATIONS FROM 2116 TO 2892 (+37%)
THE BACKLOG DECREASED FOR:
OLD CHEMICALS FROM 892 TO 785 (-12%)
NEW ACTIVE INGREDIENTS FROM 13 TO 10 (-23%)
(P-4)
-------
PESTICIDE REGISTRATION APPLICATIONS
CUMULATIVE NUMBER OF FINAL DECISIONS
As Of March 31, 1988
ACTIVE
INGREDIENT
NEW USES
2100T
1750-
1400-
1Q50-
700-
350-
AMENDED
REGISTRATION
OLD
CHEMICALS
P-4
LEGEND
| ACTUAL
3 TARGET
OVERDUE ACTIONS
4000r
3000;:
2QOO--
10DQ
8 1 2 3 ~4
QUARTERS
1r
-------
EMERGENCY EXEMPTIONS FOR PESTICIDES
OPTS MADE FINAL DECISIONS ON 64 EMERGENCY EXEMPTION APPLICATIONS
AGAINST A SECOND QUARTER TARGET OF 50. IN FY 1988 FINAL DECISIONS
HAVE BEEN MADE ON 88 EMERGENCY EXEMPTION APPLICATIONS AGAINST A
CUMULATIVE TARGET OF 110 (80%).
THE 64 DECISIONS INCLUDED 56 EMERGENCY EXEMPTIONS ISSUED AND
EIGHT DENIALS.
(P-5)
PESTICIDE TOLERANCE PETITIONS
DURING SECOND QUARTER, OPTS MADE FINAL DECISIONS ON 16 TOLERANCE
PETITIONS, AGAINST THE SECOND QUARTER TARGET OF 25. THIS BRINGS
THE CUMULATIVE TOTAL FOR DECISIONS ON TOLERANCE PETITIONS TO 37
AGAINST A CUMULATIVE TARGET OF 40 (93%).
(P-6)
-------
FIFRA COMPLIANCE MONITORING INSPECTIONS AND COMPLIANCE LEVELS
o DURING THE FIRST QUARTER*, THE STATES COMPLETED 7,154 FIFRA USE AND
RESTRICTED USE PESTICIDE DEALER INSPECTIONS, COMPLETING 227% OF
THEIR STATE GRANT TARGETS.
O THE STATES REPORTED TAKING 1,820 ENFORCEMENT ACTIONS IN THE FIRST
QUARTER, REPRESENTING A VIOLATION RATE OF 25% FOR "USE" INSPECTIONS.
THIS RATE WAS 23% FOR FY 1987.
O FOR THE SECOND QUARTER OF FY 1988, REGIONS VII AND VIII, WITH NON-
DELEGATED PROGRAMS, COMPLETED A TOTAL OF 133 USE AND RESTRICTED USE
DEALER INSPECTIONS, ACHIEVING 156% AND 121% RESPECTIVELY, OF THEIR
TARGETS.
*STATE DATA IS LAGGED ONE QUARTER
-------
FIFRA COMPLIANCE MONITORING INSPECTIONS
AND COMPLIANCE LEVELS FOR STATE ACTIVITIES
As Of December 31, 1987
125-r
"USE" INSPECTION LEVELS
Compliance Status
p
E
R
C
E
N
T
0
F
U T
M A
V
E
Q
U
A
R
T
E
R
L
Y
100--
75--
50--
25--
^-TARGET
LEGEND
25X VIOLATION WITH
ACTION TAKEN
75X D NO ACTION WARRANTED
OR COMPLIANCE
DETERMINATION PENDING
II
ra
IV
V VI VII VIII
REGIONS
IX
7,154
USE INSPECTIONS
CONDUCTED
P/E-1
-------
ADDRESSING FIFRA SIGNIFICANT NONCOMPLIANCE
DURING THE FIRST AND SECOND QUARTERS, THE REGIONS REFERRED A TOTAL
OF 27 SIGNIFICANT USE VIOLATIONS TO THE STATES FOR INVESTIGATION
AND ENFORCEMENT ACTION. A YEAR AGO 38 HAD BEEN REFERRED. AT THE
END OF THE SECOND QUARTER, OF THE 27 CASES:
- 3 (11%) WERE ADDRESSED BEYOND THE TIMEFRAME.
- 4 (15%) WERE PENDING ACTION WITHIN THE TIMEFRAME.
- 20 (74%) WERE ADDRESSED WITHIN THE TIMEFRAME.
BY THE END OF THE SECOND QUARTER, THE REGIONS HAD IDENTIFIED 50
SIGNIFICANT VIOLATOR CASES FOR EPA ACTION. TWENTY-FOUR OF THE
CASES WERE ADDRESSED AND FIVE OF THESE WERE CLOSED BY THE END OF
THE QUARTER. TWENTY-SIX CASES WERE PENDING ENFORCEMENT ACTION.
FIFRA ENFORCEMENT ACTION
THE REGIONS ISSUED A TOTAL OF 97 ADMINISTRATIVE COMPLAINTS BY THE
END OF THE SECOND QUARTER, COMPARED TO 86 A YEAR AGO. TWO CIVIL
CASES WERE REFERRED THROUGH THE SECOND QUARTER COMPARED TO THE SAME
NUMBER OF REFERRALS DURING THE SAME PERIOD LAST YEAR.
-------
ADDRESSING FIFRA SIGNIFICANT NONCOMPLIANCE
As Of March 31, 1988
REFERRALS TO STATES
P/E-3.4
LEGEND
NOT ADDRESSED BEYOND TIME FRAME
H ADDRESSED BEYOND TIMEFRAME
0 PENDING WITHIN TIMEFRAME
Q ADDRESSED WITHIN TIMEFRAME
EPA CASES AND REFERRALS FROM STATES
JU-
c
U 25-
M
U C
L A
A S 9(1-
n *3 dtU
T E
1 S
V
N F
U E
M R ,_
B R 10'
E E
R D
0 5
F
0-
//X///^
W0///S
wm<
^^^^
mfmL
SsfSs/ff/
50-r
C Af\-
u 40"
M
u
A 0
T F 3D-
I
I *
c s
N |2D-
U s
M
B
E
R10-
1234
QUARTERS
VIOLATION PENDING CASES CASES
DETECTED ENFORCEMENTADDRESSED CLOSED
ACTION
-------
ACTIVITIES RELATED TO REGULATORY INVESTIGATIONS
AND RISK MANAGEMENT ACTIONS
OPTS HAS COMPLETED TWO ACTIONS (BOTH IN FIRST QUARTER) AGAINST
THEIR SECOND QUARTER CUMULATIVE TARGET OF FOUR. OPTS REPORTS THE
TWO ACTIONS EXPECTED TO BE COMPLETED IN SECOND QUARTER SHOULD BE
COMPLETED AS FOLLOWS: REPORT ON THE PCB UNCONDITIONAL RULE
AMENDMENT DURING THIRD QUARTER AND REPORT ON THE CHLORINATED
SOLVENTS - METAL CLEANING RULE DURING FOURTH QUARTER.
(T-l)
-------
TESTING ACTIONS
o THIS MEASURE TRACKS EXISTING CHEMICAL TESTING ACTIVITY RESULTING
FROM THE INTERAGENCY TESTING COMMITTEE (ITC) RECOMMENDATIONS.
o OPTS EXCEEDED THEIR SECOND QUARTER TARGETS OF ONE EACH FOR INITIAL
ITC RESPONSES AND ITC PROMULGATIONS. THEY WERE:
# INITIAL ITC RESPONSES METHYL-T-BUTYL ETHER
ISOPROPANOL
# PROMULGATED RESPONSES DIETHYLENE GLYCOL BUTYL ETHER
ACETATE (DGBA), AND
METHYLCYLOPENTANE (MCP)
DISPOSITION OF ITC CHEMICALS TO DATE:
CHEMICALS RECOMMENDED TO DATE* 111
CHEMICALS PENDING DISPOSITION 26
CHEMICALS WITH FINAL DISPOSITION 95
(INCLUDES DECISIONS NOT TO TEST)
CHEMICALS WITH TESTING UNDERWAY 44
CHEMICALS WITH TESTING COMPLETE 21
CHEMICALS PENDING AND WITH FINAL DISPOSITION TOTAL MORE THAN
NUMBER OF CHEMICALS RECOMMENDED AS SUBSEQUENT NUMBER OF CATEGORIES
ARE IDENTIFIED FOR INDIVIDUAL TESTING ACTION.
# ACTIONS UNDER INITIAL ITC RESPONSES MAY INCLUDE DECISIONS NOT TO
TEST, NEGOTIATED CONSENT ORDERS, ANPRs AND NPRMs.
# ACTIONS UNDER ITC PROMULGATIONS MAY INCLUDE DECISIONS NOT TO
TEST, NEGOTIATED CONSENT ORDERS AND FINAL TEST RULES UNDER
SECTION 4.
(T-2)
-------
TSCA SECTION 8 AND 4 INFORMATION GATHERING RULES
THIS MEASURE REPORTS THE DATA GATHERING AUTHORITIES OF SECTIONS 8
AND 4 OF TSCA. THESE AUTHORITIES ARE USED TO FILL DATA GAPS ON
EXISTING CHEMICALS FOR OTHER OFFICES AS WELL AS OPTS. THE MEASURE
REFLECTS ACTIVITY TO FILL DATA GAPS ON EXISTING CHEMICALS IN TWO
WAYS:
THE "QUARTERLY ACTIVITY REPORT" REFLECTS THE TYPE OF DATA
RECEIVED, NUMBER OF REPORTS OR STUDIES RECEIVED, CHEMICALS
COVERED, AND PRIMARY USERS OF DATA.
THE "SUMMARY TO DATE REPORT" REFLECTS THE AMOUNT OF DATA
COLLECTED UNDER TSCA SECTIONS 8 AND 4 TO DATE AND NUMBER OF
EXISTING CHEMICALS COVERED BY THAT DATA.
NOTE: THERE ARE NO TARGETS ESTABLISHED FOR THESE REPORTS, HOWEVER,
OPTS WILL REPORT ON A QUARTERLY BASIS.
(T-3)
-------
1988 QUARTERLY ACTIVITY REPORT
Number of Reports Received/Chemicals Covered*
Primary Users
(eg. Water, Air and Radiation,
Soild Waste and Emergency
Response, Toxic Substances,
other)
OTS
OTS
OSW
OSWER
ODW
CPSC
OWRS
OTS
2nd
132/49
17/7
101/33
1/1
0/0
2/2
0/0
1/0
10/6
Total
244/186
19/9
179/134
3/4
2/2
5/6
2/2
2/4
32/25
Type Of
Data
S8(a) Exposure
S8(d) Health & Safety
Studies
S4 Health & Environ
Studies
SUMMARY TO DATE REPORT
Type of
Data
S 8 (a)
S 8(d)
S 4
Reports/ Chemical
to Date/Covered
3,092/366
5.605/298
660/41
*Note: For accounting purposes, categories and mixtures are counted as 1 Chemical
(T-3)
-------
TSCA NEW CHEMICAL REVIEWS
CHEMICAL NOTICES:
O OPTS RECEIVED 702 VALID NEW CHEMICAL SUBMISSIONS DURING SECOND
QUARTER.
581 WERE PRE-MANUFACTURE NOTICES (PMNs)
121 WERE VALID EXEMPTION NOTICES (I.E., POLYMER EXEMPTIONS,
LOW VOLUME EXEMPTIONS, AND TEST MARKET EXEMPTIONS)
O 44 NEW CHEMICAL SUBMISSIONS WERE DENIED, WITHDRAWN IN FACE OF
REGULATORY ACTION, OR SUBJECTED TO OTHER ACTION TO CONTROL
POTENTIAL RISK.
(T-4)
-------
BIOTECHNOLOGY NOTICES
OPTS RECEIVED EIGHT VALID BIOTECHNOLOGY NOTICES DURING SECOND
QUARTER. THREE SECTION 5(e) ORDERS WERE ISSUED DURING SECOND
QUARTER.
(T-5)
-------
TSCA INSPECTIONS AND COMPLIANCE LEVELS
o THE REGIONS AND HEADQUARTERS ACCOMPLISHED 87% OF THEIR SECOND
QUARTER CUMULATIVE FY 1988 TARGET FOR TSCA COMPLIANCE INSPECTIONS,
CONDUCTING 1,320 INSPECTIONS VERSUS A TARGET OF 1,511. THE 17
STATES WITH INSPECTION GRANTS CONDUCTED 728 INSPECTIONS, OR 90% OF
THE SECOND QUARTER COMMITMENTS.
O THE 2,048 EPA AND STATE INSPECTIONS DETERMINED THAT:
- 825 (40%) WERE IN COMPLIANCE.
- 271 (13%) WERE IN VIOLATION.
- 952 (47%) WERE PENDING A COMPLIANCE DETERMINATION.
O OF THE 1,096 INSPECTIONS FOR WHICH A COMPLIANCE DETERMINATION WAS
MADE BY THE END OF THE QUARTER, 271 (25%) WERE IN VIOLATION. A YEAR
AGO THIS VIOLATION RATE WAS 47%.
-------
TSCA INSPECTIONS AND COMPLIANCE LEVELS
As Of March 31, 1988
BB2 INSPECTIONS CONDUCTED
125+
TARGET
Compliance Status
i n m rv
T/E-1
v vi vn vra a
REGIONS
LEGEND
EPA
0 STATES
HQ
13%
LEGEND
IN VIOLATION
COMPLIANCE
DETERMINATION PENDING
47%
40% D IN COMPLIANCE
-------
RESPONSE TO TSCA SIGNIFICANT NONCOMPLIANCE
THE REGIONS FY 1988 BEGINNING OF YEAR (BOY) INVENTORY OF OPEN TSCA
SIGNIFICANT NONCOMPLIER CASES IS 686 (BASED ON A REVIEW OF CASES,
THE INVENTORY WAS ADJUSTED DURING THE SECOND QUARTER FROM 694 TO
686). BY THE END OF THE SECOND QUARTER, THE REGIONS HAD CLOSED 388
(57%) CASES ON THE INVENTORY AND THE 298 REMAINING CASES (43%) HAVE
BEEN OPEN MORE THAN SIX MONTHS. A YEAR AGO THE BOY INVENTORY WAS
584 OPEN CASES, THE REGIONS HAD CLOSED 334 (57%) OF THESE CASES, AND
THE REMAINING 250 (43%) CASES WERE ALL OPEN MORE THAN SIX MONTHS.
IN THE SECOND QUARTER, THE REGIONS IDENTIFIED 67 NEW SIGNIFICANT
VIOLATORS BASED ON PRE-FY 1988 INSPECTIONS. BRINGING THE YEAR-TO-
DATE TOTAL TO 486. OF THE 486 VIOLATORS BASED ON PRE-FY 1988
INSPECTIONS:
- 207 (43%) WERE PENDING ENFORCEMENT ACTION.
- 279 (57%) HAD ACTION TAKEN (CASES ISSUED) OF WHICH
91 (33%) WERE ISSUED WITHIN 180 DAYS OF INSPECTION.
- 188 (67%) WERE ISSUED BEYOND 180 DAY OF INSPECTION.
49 (18%) OF THE 279 CASES ISSUED WERE CLOSED BY END OF
QUARTER.
NOTE; THERE IS NO FORMAL SPMS TARGET FOR ISSUING CASES BASED ON
PRE-FY 1988 INSPECTIONS.
IN THE SECOND QUARTER, THE REGIONS IDENTIFIED 82 NEW SIGNIFICANT
VIOLATORS BASED ON FY 1988 INSPECTIONS BRINGING YEAR-TO-DATE TOTAL
TO 110. OF THE 110 VIOLATORS BASED ON FY 1988 INSPECTIONS:
- 86 (78%) WERE PENDING ENFORCEMENT ACTION.
- 24 (22%) HAD ACTION TAKEN (CASES ISSUED), OF WHICH
- 24 (100%) WERE ISSUED WITHIN 180 DAYS OF INSPECTION.
0 WERE ISSUED BEYOND 180 DAYS OF INSPECTION.
0 OF THE 24 CASES ISSUED WERE CLOSED BY THE END OF THE QUARTER,
THE REGIONS SURPASSED THEIR TARGET OF ISSUING 90% OF THEIR CASES
WITHIN 180 DAYS OF INSPECTION BY ISSUING 100%.
-------
RESPONSE TQ TSCA SIGNIFICANT NONCOMPLIANCE
As Of March 31, 1988
PROGRESS AGAINST FIXED
BASE
70DT
PROGRESS AGAINST NEW-
VIOLATORS (BASED ON
PRE-FY 88 INSPECTIONS!
500T
PROGRESS AGAINST NEW
VIOLATORS (BASED ON
FY 88 INSPECTIONS)
5QOT
BOY
LEGEND
D PRE 88 CLOSED
E3 OPEN MORE THAN 6
MONTHS
T/E-3,4 f3 OPEN 6 MONTHS OR LESS
VIOLATORSPENDING CASES CASES
DETECTED ENF. ISSUEDCLOSED
ACTION
VIOLATORS PENDING CASES CASES
DETECTED ENF. ISSUEDCLOSED
ACTION
LEGEND
CASES ISSUED WITHIN 180 DAYS
CASES ISSUED BEYOND 180 DAYS
-------
RESPONSE TO TSCA SIGNIFICANT NONCOMPLIANCE IN FEDERAL FACILITIES
THE REGIONS HAD A FY 1988 BEGINNING-OF-YEAR INVENTORY OF SIX OPEN
TSCA FEDERAL FACILITY SNC CASES, COMPARED TO 26 LAST YEAR. AT THE
END OF THE SECOND QUARTER, FOUR OF THE CASES WERE CLOSED, AND, THE
TWO REMAINING CASES HAVE BEEN OPEN MORE THAN SIX MONTHS.
BY THE END OF THE SECOND QUARTER, THE REGIONS IDENTIFIED 14 FEDERAL
FACILITY SIGNIFICANT VIOLATORS BASED ON PRE-FY 1988 INSPECTIONS. OF
THE 14 CASES, SIX HAD ACTION TAKEN WITHIN 180 DAYS OF INSPECTION,
EIGHT HAD ACTION TAKEN BEYOND 180 DAYS OF INSPECTION AND ONE CASE
WAS CLOSED.
BY THE END OF THE SECOND QUARTER, THE REGIONS IDENTIFIED SIX FEDERAL
FACILITY SIGNIFICANT VIOLATORS BASED ON FY 1988 INSPECTIONS. OF THE
SIX CASES, FOUR HAD ACTION TAKEN WITHIN 180 DAYS OF INSPECTION, NONE
HAD ACTION TAKEN BEYOND 180 DAYS OF INSPECTION AND TWO CASES WERE
PENDING FOR ENFORCEMENT ACTION. NONE OF THE CASES WERE CLOSED.
-------
RESPONSE TO TSCA SIGNIFICANT NONCOMPLJANCE
IN FEDERAL FACILITIES
As Of March 31, 1988
PROGRESS AGAINST FIXED
BASE
10r
PROGRESS AGAINST NEW
VIOLATORS (BASED ON
PRE-FY BB INSPECTIONS)
15T
PROGRESS AGAINST NEW
VIOLATORS (BASED ON
FY BB INSPECTIONS)
1&T
BOY
D
T/E-5
02 03 04
LEGEND
PRE 88 CLOSED
OPEN MORE THAN 6 MONTH
OPEN 6 MONTHS OR LESS
VIOLATORPENDING ACTION ACTION
DETECTED ENF. TAKEN CLOSED
ACTION
VIOLATOR PENDING ACTION ACTION
DETECTED ENF. TAKEN CLOSED
ACTION
LEGEND
D ACTION TAKEN WITHIN 180 DAYS
ACTION TAKEN BEYOND 180 DAYS
-------
TSCA ENFORCEMENT ACTIVITY
BY THE END OF THE SECOND QUARTER, THE REGIONS ISSUED A CUMULATIVE
TOTAL OF 316 ADMINISTRATIVE COMPLAINTS, COMPARED TO 451 A YEAR AGO.
DURING THE FIRST TWO QUARTERS, THE REGIONS REFERRED THREE CIVIL CASES,
THREE CRIMINAL CASES WERE REFERRED TO HEADQUARTERS FROM THE REGIONS
AND TWO CRIMINAL CASES WERE REFERRED TO DOJ DURING FY 1988.
-------
Office of Enforcement and Compliance Monitoring
-------
CIVIL ACTION PROCESSING TIME
o OECM REVIEWED AND FORWARDED 16 CIVIL REFERRALS TO THE DEPARTMENT OF
JUSTICE AND 3 REFERRALS WERE RETURNED/DECLINED TO THE REGIONS DURING
THE SECOND QUARTER. THERE WERE 15 REFERRALS FORWARDED TO THE
DEPARTMENT OF JUSTICE A YEAR AGO.
O THE AVERAGE REVIEW TIME FOR THE QUARTER WAS 32 DAYS MEETING THE 35
DAY TARGET. WHILE THE TARGET WAS MET, 15 CASES WERE PROCESSED IN 35
DAYS OR LESS AND 4 CASES EXCEEDED THE 35 DAY DEADLINE.
o OECM REVIEWED AND COMPLETED THE CHECKLIST FOR 16 DIRECT CIVIL
REFERRALS DURING THE SECOND QUARTER. THIRTEEN OF THE 16 (81%) CASES
WERE COMPLETED ON TIME WITHIN THE TARGETED REVIEW TIME OF 30 DAYS.
CIVIL REFERRAL ACTIVITY
O THE REGIONS SUBMITTED 29 NEW CIVIL REFERRALS TO HEADQUARTERS AND 38
DIRECT REFERRALS TO THE DEPARTMENT OF JUSTICE DURING THE SECOND
QUARTER (FOR A TOTAL OF 67). THE CUMULATIVE TOTAL FOR THE YEAR WAS
111 (21 MORE THAN THIS TIME LAST YEAR).
-------
FOLLOW-THROUGH ON ACTIVE CIVIL CASE DOCKET
O AS OF 10/1/87 OECM REPORTED 673 CIVIL CASES IN THE INVENTORY. AT
THE END OF THE SECOND QUARTER THERE WERE 665 CASES IN THE INVENTORY.
(167, OR 25%, OF THESE CASES HAD BEEN ONGOING FOR MORE THAN TWO
YEARS SINCE BEING FILED.) AS OF THE CLOSE OF THE QUARTER:
87 (13%) HAD BEEN CONCLUDED AFTER FILING.
10 ( 1%) WERE RETURNED BY THE DEPARTMENT OF JUSTICE FOR
PRE-FILING NEGOTIATIONS.
- 483 (73%) WERE FILED IN U.S. COURT.
4(1%) HAD BEEN WITHDRAWN/DECLINED BY EPA OR THE DEPARTMENT OF
JUSTICE.
81 (12%) WERE PENDING AT THE DEPARTMENT OF JUSTICE.
O 54 NEW CIVIL CASES WERE REFERRED TO THE DEPARTMENT OF JUSTICE DURING
THE SECOND QUARTER, MAKING THE YEARLY CUMULATIVE TOTAL 124. (LAST
YEAR 56 CASES WERE REFERRED THROUGH THE SECOND QUARTER.) AS OF THE
CLOSE OF THE QUARTER FOR THE 54 NEW SECOND QUARTER REFERRALS:
3(6%) HAD BEEN FILED IN U.S. COURT.
51 (94%) WERE PENDING AT THE DEPARTMENT OF JUSTICE.
O THE TOTAL NUMBER OF ACTIVE CASES (INCLUDING BOTH FIXED AND DYNAMIC)
WAS 618.
-------
FOLLOW-THROUGH ON ACTIVE CIVIL CASE DOCKET
As Of March 31, 1988
CIVIL CASE DOCKET
70Qr
BOY
1
NEW FY 1988
REFERRALS TO DOJ
E/C-4,5
2
QUARTERS
LEGEND
CASES CONCLUDED
CASES FILED IN COURT
CASES RETURNED BY DOJ FOR PRE RUNG NEGOTIATIONS
CASES WITHDRAWN/DECLINED
CASES PENDING AT DOJ
-t-
CUMULATIVE PENDING CASES CASES CASES
NEW AT DOJ FILED WITHDRAWN CONCLUDED
-------
CONSENT DECREE TRACKING
o THERE WERE 394 ACTIVE CONSENT DECREES IN THE SECOND QUARTER COMPARED
TO 343 A YEAR AGO.
o CONSENT DECREE COMPLIANCE FOR THE SECOND QUARTERS OF BOTH FY 1988
AND 1987 WAS 75%.
o OF THE 98 (23%) CONSENT DECREES IN VIOLATION:
- 49 (50%) HAD A CONTEMPT ACTION, A DECREE MODIFICATION REFERRED,
OR A STIPULATED PENALTY COLLECTED.
- 35 (36%) HAD FORMAL ENFORCEMENT ACTION PLANNED BUT NOT
COMMENCED.
- 14 (14%) HAD NO FORMAL ENFORCEMENT ACTION PLANNED.
-------
CONSENT DECREE TRACKING (EPA DECREES ONLY)
As Of March 31, 1988
National
Summary
1234
QUARTERS
IV
V VI
REGIONS
VII VIII
IX
E/C-1
LEGEND
In compliance with the terms of the decree
In violation with formal enforcement action Initiated
In violation with formal enforcement action planned but uncommenced
In violation with no formal enforcement action planned at this time
-------
CRIMINAL REFERRAL ACTIVITY
o TWENTY-SEVEN NEW CRIMINAL INVESTIGATIONS WERE OPENED DURING THE
SECOND QUARTER. ELEVEN INVESTIGATIONS WERE CLOSED PRIOR TO REFERRAL
TO THE OFFICE OF CRIMINAL ENFORCEMENT. THERE WERE 135 OPEN
INVESTIGATIONS AT THE END OF THE QUARTER (OF THESE, 69 WERE RCRA, 32
WERE CWA/SDWA AND 21 WERE CAA).
o THE REGIONS REFERRED 23 CASES TO HEADQUARTERS DURING THE FIRST AND
SECOND QUARTERS, AND HEADQUARTERS REFERRED 20 TO THE DEPARTMENT OF
JUSTICE. TWO CASES WERE RETURNED, DECLINED OR RECOMMENDED FOR CIVIL
OR ADMINISTRATIVE ACTION BY HEADQUARTERS DURING THE FIRST TWO
QUARTERS.
-------
FOLLOW-THROUGH ON ACTIVE CRIMINAL CASE DOCKET
o 67 CRIMINAL CASES WERE PENDING AT THE DEPARTMENT OF JUSTICE OR FILED
IN COURT AS OF 10/1/87. AS OF THE CLOSE OF THE QUARTER:
3(4%) HAD BEEN CLOSED WITHOUT PROSECUTION.
3(4%) HAD BEEN CLOSED FOLLOWING PROSECUTION.
- 16 (24%) HAD CHARGES FILED.
- 29 (43%) WERE UNDER GRAND JURY INVESTIGATION.
- 16 (24%) WERE UNDER REVIEW BY THE DEPARTMENT OF JUSTICE.
o TWENTY NEW CRIMINAL CASES WERE REFERRED TO THE DEPARTMENT OF JUSTICE
DURING THE FIRST QUARTER. AS OF THE CLOSE OF THE QUARTER:
3 (15%) HAD CHARGES FILED
9 (45%) WERE UNDER GRAND JURY INVESTIGATION.
8 (40%) WERE UNDER REVIEW BY THE DEPARTMENT OF JUSTICE.
O THE TOTAL NUMBER OF ACTIVE CASES REMAINING WAS 81.
-------
FOLLOW-THROUGH ON ACTIVE CRIMINAL CASE DOCKET
As Of March 31, 1988
CRIMINAL REFERRALS PENDING
STATUS OF NEW
FY 19BQ REFERRALS
20T
N
U
M
B
E
R
15-
Q 10"
F
C
A
S
E
S
5
-f-
BOY
2
QUARTERS
E/C-7.8
LEGEND
0 CLOSED BY DOJ WITHOUT PROSECUTION
0 CLOSED FOLLOWING PROSECUTION
S WITH CHARGES FILED
^ UNDER GRAND JURY INVESTIGATION
D UNDER REVIEW AT DOJ
TO DOJ BY OECM
-J-
2 3
QUARTERS
CUMULATIVE # OF NEW REFERRALS
20
-------
NUMBER OF NEW REFERRALS TO EPA-OCEC
CUMULATIVE THROUGH FY 1988
REGION
REGION I
REGION II
REGION III
REGION IV
REGION V
REGION VI
REGION VII
REGION VIII
REGION IX
REGION X
NEIC
RCRA
1
1
1
4
1
1
1
1
1
CLEAN CLEAN
AIR WATER FIFRA TSCA CERCLA TOTAL
2 3
1 2
1 12
1
4
1 . 2
1 2
1 1
1 2
1 2
1 2
TOTAL
12
0
0
23
-------
100r
BD--
N 60-
U
M
B
E
R 40+
20--
PROCUREMENT SERVICE STANDARDS
NEW CONTRACTS AWARDED DURING QUARTER
As Of March 31, 1988
COMPETITIVE
2 3
QUARTERS
50r
40--
N 30+
U
M
B
E
R 20--
10--
H
SOLE SOURCE
2 3
QUARTERS
AD-1
LEGEND
OARM DELAYS
DELAYS EXTERNAL TO OARM
COMPLETED WITHIN STANDARD OR NEGOTIATED SCHEDULE
-------
HEADQUARTERS RESOURCE UTILIZATION
O IN THE SECOND QUARTER, BOTH SUPERFUND FTE (53.5%) AND
SUPERFUND TRAVEL (51.0%) ARE SLIGHTLY ABOVE THE TARGETED
UTILIZATION LEVEL OF 50.0%.
O S&E FTE USAGE IS BELOW TARGET AT 48.7%; S&E TRAVEL
USE IS RIGHT ON TARGET AT 50-2%.
O DOLLAR UTILIZATION RATES WERE WITHIN OPERATING PLAN
LEVELS AT HEADQUARTERS FOR THE FIRST TWO QUARTERS
OF FY 1988.
- S&E DOLLAR EXPENDITURES WERE AT 88.3%.
- SUPERFUND USAGE DURING THE SECOND QUARTER
WAS AT 74.2%.
- AC&C DOLLAR USAGE WAS 74.6%.
- R&D DOLLAR EXPENDITURES WERE VERY CLOSE TO
PLAN AT 89.9%.
- B&F DOLLAR USAGE IN THE SECOND QUARTER IS
ONLY 4%.
- LUST DOLLAR EXPENDITURES WERE AT 56.8% OF
PLAN.
-------
HEADQUARTERS RESOURCE UTILIZATION
(SECOND QUARTER = 50.0% OF YEAR)
53.5%
50. OK
OF
YEAR
A
I
48.7%
50.2%
01. OV
0
S&E SF S&E SF
FTE TRAVEL
USE USE
$314.4 ($ IN MILLIONS)
$289.7
CSNNNX
$232.8
OP PLAN
ACTUALS
$111.4
$25.3 $2.3
$4.1
S&E SF AC&C R&D B&F LUST
DOLLAR UTILIZATION
AS COMPARED TO
QUARTERLY PLANS
-------
REGIONAL RESOURCE UTILIZATION
O REGIONAL S&E FTE UTILIZATION WAS CONSISTENT WITH HEADQUARTERS
THROUGH THE SECOND QUARTER.
O S&E TRAVEL USAGE 55.2% IS WELL ABOVE THE TARGETED LEVEL OF
50.0%. ;
O SUPERFUND TRAVEL AND FTE USE IS STILL BELOW THE PLAN OVERALL -
45.5% AND 48.4% RESPECTIVELY.
O IN THE SECOND QUARTER, REGIONAL DOLLAR UTILIZATION IS SIMILAR
TO THAT OF HEADQUARTERS.
- S&E DOLLAR UTILIZATION WAS 92.2%.
- REGIONAL SUPERFUND USAGE WAS 74.9%.
- AC&C DOLLAR UTILIZATION WAS 75.1%.
- LUST DOLLAR EXPENDITURES WERE 32.6%.
-------
REGIONS RESOURCE UTILIZATION
(SECOND QUARTER = 50.0% OF YEAR)
55.2%
$583.6
($ IN MILLIONS)
50.0%
OF
YEAR
48.6%
48.4%
45.5%
S&E SF S&E SF
FTE TRAVEL
USE USE
OP PLAN
ACTUALS
$11.1
S&E SF AC&C R&D B&F LUST
DOLLAR UTILIZATION
AS COMPARED TO
QUARTERLY PLANS
-------
Office of Policy, Planning, and Evaluation
-------
OFFICE OF POLICY, PLANNING AND EVALUATION
RED BORDER REVIEW DEADLINES
O THIRTy RED BORDER DOCUMENTS WERE RECEIVED FOR REVIEW BY
OPPE DURING THE QUARTER.
28 (93%) OF THESE WERE COMPLETED WITHIN THREE-WEEK
REVIEW PERIOD.
O THE TWO NOT COMPLETED WITHIN THE STANDARD WERE:
SOLID WASTE DISPOSAL FACILITY CRITERIA - RED BORDER WAS
DUE 2/4/88, AND WAS COMPLETED ON 2/12/88.
NATIONAL CONTINGENCY PLAN - RED BORDER WAS DUE 3/18/88
AND WAS COMPLETED ON 4/4/88.
-------
Office of External Affairs
-------
FEDERAL FACILITIES WITH POTENTIAL COMPLIANCE
PROBLEMS IN A-1Q6 MEDIA PROGRAM PRIORITY AREAS
DURING THE FIRST QUARTER, THE OFFICE OF EXTERNAL AFFAIRS (OEA), WORKING
WITH THE AIR, WATER, AND HAZARDOUS WASTE MEDIA OFFICES IDENTIFIED 181
FEDERAL FACILITIES WITH POTENTIAL COMPLIANCE PROBLEMS IN THEIR RESPECTIVE
MEDIA AREAS.
o 9 (5% OF TOTAL) FACILITIES ARE IN THE AIR MEDIA
o 34 (19% OF TOTAL) FACILITIES ARE IN THE WATER MEDIA
o 138 (76% OF TOTAL) FACILITIES ARE IN THE HAZARDOUS WASTE MEDIA
o REGION I IDENTIFIED NO POTENTIAL PROBLEMS AND REGION IX HAD 58 (32%)
OF THE 181 FACILITIES WITH POTENTIAL PROBLEMS.
-------
FEDERAL FACILITIES WITH POTENTIAL COMPLIANCE
PROBLEMS IN A-106 MEDIA PROGRAM PRIORITY AREAS
AIR
NINE FEDERAL FACILITIES HAVE POTENTIAL AIR COMPLIANCE PROBLEMS AND
THROUGH THE SECOND QUARTER FOUR (44%) HAVE BEEN ADDRESSED.
O SIX ARE VOC FACILITIES IN OZONE NONATTAINMENT AREAS.
- TWO FACILITIES HAVE BEEN ADDRESSED.
o THREE ARE FACILITIES NEEDING TO MEET EXISTING NESHAP REQUIREMENTS,
- TWO FACILITIES HAVE BEEN ADDRESSED.
-------
PROCUREMENT SERVICE STANDARDS
MAJOR NEGOTIATED PROCUREMENTS
DURING THE SECOND QUARTER OARM AWARDED 28 NEW COMPETITIVE AND NEW
SOLE SOURCE CONTRACTS, OF WHICH 17 (61%) WERE AWARDED WITHIN THE
STANDARD OR NEGOTIATED SCHEDULE.
NEW COMPETITIVE CONTRACTS
FOURTEEN OF THE 21 (67%) WERE AWARDED ON SCHEDULE. OARM WAS
RESPONSIBLE FOR FOUR OF THE DELAYS. DEFENSE CONTRACT AUDIT
AGENCY (DCAA) WAS RESPONSIBLE FOR ONE DELAY AND TWO DELAYS
WERE DUE TO PROGRAM AND OTHER OFFICES.
NEW SOLE SOURCE CONTRACTS
THREE OF THE SEVEN (43%) WERE AWARDED ON TIME. OARM REPORTS
ONE INTERNAL DELAY AND THREE WERE DUE TO PROGRAM AND OTHER
OFFICES.
PURCHASE ORDERS
If691 OF 3,175 (53%) COMPETITIVE AND SOLE SOURCE PURCHASE
ORDERS WERE ISSUED WITHIN THE STANDARD.
OARM STATES THE REMAINING 1,484 ORDERS WERE ISSUED DURING THE
QUARTER BUT WERE NOT COMPLETED WITHIN THE STANDARD (FOUR TO
80 DAY).
-------
GRANTS SERVICE STANDARDS
NUMBER OF ACTIONS COMPLETED DURING QUARTER
As Of March 31, 1988
GRANT OR COOPERATIVE
AGREEMENT AWARDED
INTERAGENCY AGREEMENT
AWARDED AFTER RECEIPT
720r
N54D
U
M
B
E
R
360
1BQ-
234
QUARTERS
DETERMINATION PREPARED FOR
DEVIATION FROM REGULATORY
REQUIREMENTS
6Dr
N 45-
U
M
B
3D--
15-
2 3
QUARTERS
N
U
M
B
E
R
LEGEND
D OARM DELAYS
ACTIONS COMPLETED
WITHIN TARGET
200r
150-
100-
50-
2 3
QUARTERS
SUSPENSION/DEBARMENT
DETERMINATION ISSUED AFTER
CASE RECORD COMPLETE
72T
2 3
QUARTERS
AD-1A
-------
GRANTS SERVICE ACTIONS
o 543 GRANTS SERVICE ACTIONS WERE PROCESSED/AWARDED DURING THE
SECOND QUARTER. OF THESE, 517 (95%) WERE PROCESSED ON TIME. FOR
EACH CATEGORY, THE NUMBER AND PERCENTAGE PROCESSED WITHIN THE
STANDARD, WERE:
GRANTS AND COOPERATIVE AGREEMENTS
257 OF 273 (94%)
INTERAGENCY AGREEMENTS
182 OF 190 (96%)
DETERMINATIONS FOR REQUESTS FOR DEVIATION FROM REGULATORY
REQUIREMENTS
10 OF 12 (83%)
DETERMINATIONS IN SUSPENSION/DEBARMENT CASES
68 OF 68 (100%)
-------
PERSONNEL SERVICE STANDARDS
NUMBER OF ACTIONS COMPLETED DURING QUARTER
As Of March 31, 1988
RECRUITMENT ACTIONS
INTERNAL TO EPA
35Dr
1234
QUARTERS
RECRUITMENT ACTIONS
EXTERNAL TO EPA
AD-1B
25Dr
200-
15t>
100
50
1234
QUARTERS
LEGEND
D OARM DELAYS
E3 SECURITY CLEARANCE DELAY
E2 0PM DELAYS
E3 CUENT PROGRAM OFFICE DELAYS
COMPLETED WITHIN STANDARD SCHEDULE
NON-COMPETITIVE
ACTIONS
234
QUARTERS
-------
PERSONNEL SERVICES
OARM PROCESSED 2,014 PERSONNEL ACTIONS DURING THE QUARTER. OF
THESE, 1,962 (97%) MET THE PROCESSING TIME STANDARD.
INTERNAL ACTIONS
205 OF 232 (88%) WERE PROCESSED ON TIME. FOR THE 27 NOT
PROCESSED WITHIN THE STANDARD, OARM REPORTS THAT 15 OF THE
DELAYS WERE DUE TO PROGRAM OFFICES, 11 WERE DUE TO OARM AND
ONE DUE TO OTHER CAUSES, (E.G., AWAITING SECURITY CLEARANCE)
EXTERNAL RECRUITMENT ACTIONS
68 OF 74 (91%) WERE PROCESSED WITHIN THE STANDARD. OPM
AND THE PROGRAM OFFICES WERE EACH RESPONSIBLE FOR THREE
DELAYS.
NON-COMPETITIVE ACTIONS
313 OF 320 (98%) WERE ON TIME. THE SEVEN DELAYS WERE
ATTRIBUTED TO OARM.
ADMINISTRATIVE ACTIONS
724 OF 736 (98%) WERE PROCESSED WITHIN THE STANDARD.
AWARDS
ALL AWARD ACTIONS (652) WERE ON TIME.
-------
Office of Administration and Resources Management
-171-
-------
FEDERAL FACILITIES WITH POTENTIAL COMPLIANCE
PROBLEMS IN A-106 MEDIA PROGRAM PRIORITY AREAS
As Of March 31, 1988
AIR
VOC COMPLIANCE IN OZONE
NONATTAINMENT AREAS
COMPLIANCE WITH ALL
EXISTING NESHAPS REQUIREMENTS
OEA-1/E.2/E.3/E
LEGEND
FACILITIES IDENTIFIED
0 FACILITIES ADDRESSED
D FACILITIES UNADDRESSED
-------
FEDERAL FACILITIES WITH POTENTIAL COMPLIANCE
PROBLEMS IN A-106 MEDIA PROGRAM PRIORITY AREAS
, WATER
/
THIRTY-FOUR FEDERAL FACILITIES HAVE POTENTIAL WATER COMPLIANCE PROBLEMS
ANDr THROUGH THE SECOND QUARTER, NINE (26%) HAVE BEEN ADDRESSED.
o EIGHT ARE NPDES COMPLIANCE PROBLEMS WITH PRETREATMENT STANDARDS FOR
FEDERAL FACILITIES DISCHARGING TO POTWs.
- SIX FACILITIES HAVE BEEN ADDRESSED.
O TEN ARE FEDERAL FACILITIES WITH REQUIREMENTS FOR BIOMONITORING
STUDIES AND CONTROLS FOR WATER QUALITY.
- NONE HAVE BEEN ADDRESSED.
O SIXTEEN ARE FEDERAL FACILITIES WITH NEW TREATMENT STANDARDS UNDER
THE 1986 SAFE DRINKING WATER ACT AMENDMENTS.
- THREE HAVE BEEN ADDRESSED.
-------
FEDERAL FACILITIES WITH POTENTIAL COMPLIANCE
PROBLEMS IN A-106 MEDIA PROGRAM PRIORITY AREAS
As Of December 31, 1987
WATER
COMPLIANCE WITH PRETREATMENT
STANDARDS FOR FED. FAC. DISCHARGING
TO POTWS
10r
16r
BIO MONITORING STUDIES AND
CONTROLS UNDER SECTION 30B
WQA 1967
10T
COMPLIANCE WITH NEW DRINKING
WATER TREATMENT STANDARDS
UNDER 1086 AMENDMENT SDWA
OEA-1/E,2/E.3/EB
234
LEGEND
FACILITIES IDENTIFIED
FACILITIES ADDRESSED
FACILITIES UNADDRESSED
-------
FEDERAL FACILITIES WITH POTENTIAL COMPLIANCE
PROBLEMS IN A-106 MEDIA PROGRAM PRIORITY AREAS
HAZARDOUS WASTE
ONE HUNDRED AND THIRTY-EIGHT FEDERAL FACILITIES HAVE POTENTIAL HAZARDOUS
WASTE COMPLIANCE PROBLEMS AND, THROUGH THE SECOND QUARTER, 52 (29%)
HAVE BEEN ADDRESSED.
O THIRTY-SEVEN ARE FACILITIES WITH LAND BAN REQUIREMENTS AND MINIMUM
TECHNOLOGY REQUIREMENTS.
- ELEVEN HAVE BEEN ADDRESSED.
O TWELVE ARE FACILITIES WITH CORRECTIVE ACTION REQUIREMENTS UNDER RCRA
AND CERCLA.
- ONE HAS BEEN ADDRESSED.
O TWELVE ARE FACILITIES WITH RCRA PERMIT DEADLINES AND CONDITIONS.
- THREE HAVE BEEN ADDRESSED.
(CONTINUED ON FOLLOWING PAGE)
-------
FEDERAL FACILITIES WITH POTENTIAL COMPLIANCE
PROBLEMS IN A-106 MEDIA PROGRAM PRIORITY AREAS
As Of March 31, 1988
HAZARDOUS WASTE
COMPLIANCE WITH LAND BAN REGULATIONS
AND MINIMUM TECHNOLOGY REQUIREMENTS
40r
COMPLIANCE WITH CORRECTIVE ACTION
REQUIREMENTS UNDER RCRA AND CERCLA
40
20-
MEETING RCRA PERMIT
DEADLINES AND CONDITIONS
-4-
OEA-1/E.2/E.3/EB
2 3
LEGEND
FACILITIES IDENTIFIED
0 FACILITIES ADDRESSED
D FACILITIES UNADDRESSED
-------
FEDERAL FACILITIES WITH POTENTIAL COMPLIANCE
PROBLEMS IN A-106 MEDIA PROGRAM PRIORITY AREAS
HAZARDOUS WASTE - CONTINUED
o TWENTY-SIX ARE FACILITIES WITH APPLICABLE GROUNDWATER MONITORING
REQUIREMENTS.
- THIRTEEN HAVE BEEN ADDRESSED.
o FIFTY-ONE ARE FACILITIES WITH CLOSURE/POSTCLOSURE PLANS AND REQUIRE-
MENTS.
- TWENTY-FOUR HAVE BEEN ADDRESSED.
-------
FEDERAL FACILITIES WITH POTENTIAL COMPLIANCE
PROBLEMS IN A-106 MEDIA PROGRAM PRIORITY AREAS
As Of March 31, 1988
HAZARDOUS WASTE
COMPLIANCE WITH APPLICABLE
GROUNDWATER MONITORING REQUIREMENTS
50r
CLOSED OR CLOSING UNITS IN
COMPLIANCE WITH CLOSURE/POSTCLOSURE
PLANS AND REQUIREMENTS
60T
OEA-1/E.2/E.3/E
LEGEND
FACILITIES IDENTIFIED
0 FACILITIES ADDRESSED
D FACILITIES UNADDRESSED
-1Q7-
-------
RESPONSE TO SIGNIFICANT FEDERAL FACILITY NONCOMPLIANCE
O OAR IDENTIFIED AT THE BEGINNING OF THE YEAR (BOY) 13 FEDERAL FACILI-
TIES IN SIGNIFICANT NONCOMPLIANCE (SNC). TWO SNCs HAVE BEEN ADDRESSED
THROUGH THE SECOND QUARTER AGAINST A TARGET OF FOUR.
O OW IDENTIFIED FIVE FEDERAL FACILITIES ON THE EXCEPTIONS LIST THAT WERE
CARRIED OVER FROM THE PREVIOUS QUARTER. ONE WAS RETURNED TO COMPLIANCE
AND ONE HAD AN ENFORCEMENT ACTION INITIATED. THE REMAINING THREE PLUS
FOUR NEW SIGNIFICANT VIOLATORS ON THE EXCEPTIONS REPORT CONSTITUTE
THE PENDING BALANCE OF SEVEN FACILITIES.
O OPTS IDENTIFIED SIX FEDERAL FACILITIES IN SNC AT THE BOY. THROUGH
THE SECOND QUARTER, FOUR CASES WERE CLOSED AND TWO CASES WERE OPEN
MORE THEN SIX MONTHS.
o OSWER COMPLIANCE SNAPSHOT IN THE FIRST QUARTER SHOWS 45 FEDERAL
FACILITIES IN SNC WITH 14 ADDRESSED.
-------
RESPONSE TO SIGNIFICANT FEDERAL FACILITY NONCOMPLIANCE
As Of March 31, 1988
AIR FIXED BASE
21T
14-
It
BOY 1
LEGEND
P ADDRESSED
PENDING
TSCA FIXED BASE
8-
&
4-
2
0-
-*-
OEA-SNC1
BOY 1 2 3
LEGEND
LI PRE 88 CLOSED
E3 OPEN MORE THAN 6 MONTHS
ฃ1 OPEN 6 MONTHS OR LESS
WATER EXCEPTIONS REPORT
1Qr
SNC ENFORCEMENT RETURNED PENDING
ACTION TO
COMPLIANCE
LEGEND
D SNC 2 CONSECUTIVE QUARTERS
SNC FOR MORE THAN 2 QUARTERS
RCRA COMPLIANCE SNAPSHOT
5&T
LEGEND
# SNC/ADDRESS/END OF QUARTER
# SNC/UNADDRESSED/END OF QUARTER
-------
Office of General Counsel
-------
RED BORDER REVIEW DEADLINES
o OGC RECEIVED 37 RED BORDER DOCUMENTS FOR REVIEW DURING THE SECOND
QUARTER.
o OGC COMPLETED:
- NINETEEN (51%) OF THEIR REVIEWS WITHIN THREE WEEKS, COMPARED
TO A TARGET OF 80%, AND
- SIX MORE FOR A TOTAL OF 25 (68%) WITHIN FOUR WEEKS, COMPARED
TO A TARGET OF 100% WITHIN FOUR WEEKS.
o TWELVE REVIEWS (32%) WERE NOT COMPLETED WITHIN THE FOUR WEEK
REVIEW TARGET: NINE OSWER, TWO OPTS, AND ONE FOR OW.
STATE DELEGATION AGREEMENT REVIEW DEADLINE
o OGC RECEIVED NO APPLICATIONS FOR EVALUATION DURING THE SECOND
QUARTER.
-------
t
r
20-r
N
U
M
B
E
R
F 10--
R
E
V
I
E
W 5
S
0
OGC SUMMARY FOR RED BORDER REVIEW PACKAGES
As Of March 31, 1988
OAR
OARM
OSWER
PROGRAMS
OPTS
OW
G/C-2
LEGEND
INCOMPLETE AFTER 4 WEEKS
COMPLETED WITHIN 4 WEEKS
COMPLETED WITHIN 3 WEEKS
AGENCY SUMMARY
234
QUARTERS
------- |