ORDNERLFY022Q n
  S-EPA
United States
Environmental Protection
Agency
Office of Research and Development
National Exposure Research Laboratory
Environmental Sciences Division
P. 0. Box 93478
Las Vegas, NV 89193-3478      March 2002
      National Exposure Research Laboratory
          Environmental Sciences Division
               Superfund Technology
                  Support Project
          Technology Support Center
             for Monitoring and Site
             Characterization FY02
             Second Quarter Report
              January - March 2002
                      U.S. Fnvirr.'imeiUul Protection Agency
                         V'i!
                      Iriion'Kii.,>:i 1\.-source Center
                         5;h S!",vc
EPA-ORD-NERL-FY02(2Q)

-------
              UNITED STATES ENVIRONMENTAL PROTECTION AGENCY
     \               NATIONAL EXPOSURE RESEARCH LABORATORY
      |                P.O. BOX 93478 » LAS VEGAS, NV 89193-3478
                                 APR 30  200)
                                                                        OFFICE OF
                                                                 RESEARCH AND DEVELOPMENT
MEMORANDUM

SUBJECT:   National Exposure Research Laboratory
             Environmental Sciences Division
             FY02 Second Quarter Report

FROM:      Kenneth W. Brown, Director, Technology Support Center (TSC)
             Characterization and Monitoring Branch, BSD

TO:         Richard Steimle, Project Manager (5102W)
             Superrund Technology Support Project

             Dan Powell (5102W)
             Technology Innovation Office

      Attached is the FY02 Second Quarter Report pertaining to the activities of the
Environmental Sciences Division-Las Vegas, (BSD) Technology Support Center, (TSC).  This
quarterly report includes the months of January, February and March 2002. The total Superfund
resources spent for those projects identified in the attached report were $158,958 TSC and
$7,200 PC&B.

      A total of eleven new projects were started this quarter. The following projects were
completed during the second quarter of FY02 and are, therefore, deleted from this quarterly
report: Ottatti and Goss/Kingston Steel Drum, Diamond Alkali, Vieques Puerto Rico, Ogden
Rail Yard, San Fernando, Valeteria Dry Cleaners, Yuma (MCASY), Camp Bonneville,
Methamphetamine Multi Laboratory and UVA Hillside Disposal Area.

      If you have any questions about this report, please give me a call at (702) 798-2270.

Attachment

cc:    John G. Lyon, ODC                           Regional Scientists
      J. Gareth Pearson, ODC                        STLP Designees
      Kathie Stephens-Landers, ODC                  Forum Co-Chairs
      Jane Denne, NERL-ESD-LV                    Sharon Frey, OSWER
      Christian Daughton, ECB                       Tim Ehli, LMSG
      Connie Perullo, ORIA                          Connie Bosma, ORD (8104R)
      Don Garofalo, EPIC                           Randy Wentsel, ORD (8623D)
          Recycled/Recyclable ° Printed with Vegetable Oil Based Inks on 100% Recycled Paper (40% Postconsumer)

-------
Bruce Jones, LEB                          Ken Moor, INEEL
Brian Schumacher, CMB                     Irish St. Clair, DOE
Kim Rogers, HERB                         A. K. Singh, UNLV

-------
                               TABLE OF CONTENTS

                                (Indexed by Site Name)
REGION 1	  1
        GE Housatonic River S. F. Site	  1
        Loring AFB S. F. Site 	  1
        Military Reservation (Massachusetts) S. F. Site 	  2
        Savage Well Municipal Water Supply OU-2 S. F. Site	  3
        South Weymouth Naval Ah- Station S. F. Site  	  4
        Union Chemical Company S.  F. Site	  5
REGION 2	  6
        Caldwell Trucking Co. S. F. Site	  6
        Ciba-Geigy S. F. Site	  6
        Cornell Dubilier S F.  Site  	  7
        Diamond Head Oil Refinery	  8
        Milliards Creek S. F. Site	  8
        Hooker Chemical/Ruco Polymer S. F. Site	  9
        Liberty Industrial S. F. Site	  10
        Reich Farms S. F. Site	  11
        Route 561 Dump S. F. Site 	  12
        Solvent Savers S. F. Site	  12
        Stanton Cleaners S. F. Site 	  13
        United States Avenue Burn S. F. Site  	  14
REGION 3	  14
        Big John Savage Hoult Road S. F. Site	  14
        Chem Solve Inc. S. F. Site	  15
        Fairmont Coke Works S. F. Site	  16
        Langley AFB S. F. Site	  16
        Letterkenny Army Depot S. F. Site	  17
        Maryland Sand, Gravel and Stone S. F. Site	  18
        Naval Surface Warfare Center - White Oak S. F.Site	  19
        Norfolk Naval Shipyard S. F.  Site	  19
        Occidental Chemical  S. F. Site 	  20
        Sharon Steel (Farrell Works) S. F.  Site	  21
REGION 4	  21
        Distler Brickyard S. F. Site	  21
        Distler Farm S. F. Site	  23
        Duracell Battery Tech S. F.Site  	  23
        Estech General Chemicals S. F. Site	  24
        Mallory Capacitor S. F. Site  	  25
        Northeast Chemical S F. Site	  25
        Roanoke River Study S. F. Site	  26
        Shuron Inc. S. F. Site	  27
        Tower Chemical Company S. F. Site  	  28
REGION 5	  29
        Pristine Inc., S. F. Site	  29
        U.S. Army Fort Sheridan Landfills S. F. Site  	  29
REGION 6	  30
        ASARCO Smelter (El Paso, Texas) S. F. Site  	  30
        Sol Lynn/Industrial Transformers S. F. Site 	  30

-------
               South Cavalcade S. F. Site	  31
               Texarkana Wood Preserving S. F. Site 	  32
        REGION 7	  33
               Asarco Omaha Facility S. F. Site	  33
               Big River Mine Tailing S. F. Site  	  34
               Eagle-Picher S. F. Site	  35
               Iowa Army Ammunition Plant S. F. Site	  36
               Oronogo-Duenweg Mining Belt S. F. Site  	  36
        REGION 8	  37
               Eureka Mills S. F. Site	  37
               Gilt Edge Mine S. F. Site	:...'.  38
               Lowry Landfill S. F. Site	  38
        REGION 9	  39
               Aerojet General Corp. S. F. Site 	  39
               Alark Hard Chrome S. F. Site	  40
               Casmalia Disposal S. F. Site 	  41
               City of Phoenix 19th Avenue Landfill S. F. Site 	  41
               Eglin AFB S. F. Site  	  42
               Fort Ord S. F. Site	  43
               Hayden Property #2 S. F. Site	  44
               McClellan AFB S. F. Site 	  44
               MGM Brakes S. F. Site	  45
               Midway Village S. F. Site	  46
               Modesto Groundwater Contamination S. F. Site	  46
               Motorola Inc. S. F. Site	  47
               Pemaco Maywood S. F. Site	  49
               Pukola Wood Treating S. F. Site	  50
               Sierra Army Depot S. F. Site	  50
               Williams AFB S. F. Site  	  51
        REGION 10	  51
               Bunker Hill Mining S. F. Site 	  51

SUPERFUND SHORT-TERM REQUESTS	  52

SUPERFUND REMOTE SENSING SHORT TERM REQUESTS	  56

ISSUE PAPER/ISSUES	  57
               General Battery Corporation	  57
               Estimation of the Exposure  Point Concentration Term Using a Gamma Distribution  	  58
               Multi-Agency Radiation Survey and Site Investigation Manual	  58
               UST Vapor Monitoring Guidance Document	  59

SUPERFUND COORDINATION	  61

TECHNOLOGY TRANSFER	  62
                                              11

-------
                                           SUPERFUND
REGION 1

•   Project Name: GE
    Site: GE Housatonic River S. F. Site
    Site ID:

    Type Lead:
    Requested by: Margaret McDonough (617) 918-1276
    Lead Scientist: Anita Singh (702) 897-3234

    Start Date: November 2001
    Expected Completion Date: July 2002
    Revised Completion Date:

    Estimated Budget:$ 15,000
    Revised Budget: $
    Major Contaminants: PCB's
Total Expenses:$6,117
Total FY02 Expenses:$6,l 17
Total 2nd. Qtr. Expenses:$6,l 17
    The Regional RPM requested that the ESD-LV TSC provide assistance in reviewing the statistical and data
    assessment procedures and methods that are being utilized by the PRP's to assess site data.

    Substantial progress has been made over the past year on the cleanup of the Housatonic River. Much of the
    focus has been on removing PCB-contaminated river sediments and bank soils from the upper '/2-mile reach of
    the Housatonic River in Pittsfield, MA. As of 2001, more that 10,700 cubic yards of contaminated river
    sediments and bank soils have been removed. The upper !/2 mile cleanup is scheduled to be done by
    March 2002.

    A number of site documents were provided to the TSC for review. Following the review of these documents
    the TSC provided the Region with the report titled "Review of Alternative Methods Proposed by GE for
    Calculating the Exposure Point Concentrations for the Housatonic River Site, Pittsfield, MA." Additional
    support is anticipated.

•   Project Name: Loring
    Site: Loring AFB S. F. Site
    Site ID:

    Type Lead:
    Requested by: Mike Daly (617) 918-1386
    Lead Scientist: Anita Singh (702) 897-3234

    Start Date: November 2001
    Expected Completion Date: May 2002
    Revised Completion Date:
    Estimated Budget:$ 19,000
    Revised Budget:$30,000
    Major Contaminants: Organics
Total Exps:$25,859      PC&B:$2,600
Total FY02 Exps:$2,692  PC&B:$300
Total 2nd Qtr. Exps:$500 PC&BS300

-------
    The Regional RPM requested that the ESD-LV TSC provide assistance in reviewing the statistical and data
    assessment methods and procedures that are being utilized by the PRP's contractor to evaluate seasonal
    contaminant trends in groundwater.

    The 9,000-acre Loring Air Force Base located in Maine has operated as an active military installation since
    1952.  An estimated 1,200 people obtain drinking water from wells within 3 miles of hazardous substances on
    the base. The nearest well is less that 500 feet from where transformers were buried.  Hazardous wastes
    generated on the base include waste oils, fuels cleaned from aircraft and vehicles, spent solvents (many are
    chlorinated organic chemicals) polychlorinated biphenyls (PCBs), and pesticides.  Historically, wastes have
    been burned or buried in landfills.  There are on-site landfills, some of which are old gravel pits. Landfills #2
    and #3 were used for disposal of hazardous wastes from 1956 to the early 1980s.

    Tests of monitoring wells indicate that the groundwater on the base is contaminated with volatile organic
    compounds (VOCs) such as methylene chloride, trichloroethylene (TCE), and carbon tetrachloride and heavy
    metals including barium.  Soils in the Flightline Area contain significant amounts of fuel, oil, and various
    VOCs.

    The TSC received a "Technical Memorandum Operable Unit (OU) 12 Annual Report Statistical Methodology,
    Loring AFB" dated November 20, 2001. Following a review of this document, the TSC provided  comments
    and recommendations to the RPM.

•   Project Name: Camp Edwards (Otis AFB)
    Site: Military Reservation (Massachusetts) S. F. Site
    Site ID:

    Type Lead:
    Requested by: Mike Jasinski (617) 918-1352, Paul Marchessault (617) 918-1388 T. Borci (617) 918-1358
    Lead Scientist: Bob Starr (208) 526-0174, Jeff Sondrup (208)526-8396, Art Rood (208)  526-1678

    Start Date: July 1998
    Expected Completion Date: April 1999
    Revised Completion Date: August 2002

    Estimated Budget: $40,000                                   Total Exps:$85,231       PC&B:$3,700
    Revised Budget: $89,000                                    Total FY02 Exps:$ 1,530   PC&B:$400
    Major Contaminants: Organics                                Total 2nd Qtr. Exps:$598  PC&B:$400

    The Regional RPM requested that the ESD-LV TSC provide assistance in evaluating the feasibility of
    implementing natural attenuation as the remedial remedy for groundwater contamination  at this site.

    The Otis Air National Guard Base (NGB) and Camp Edwards covers approximately 3,900 acres on a 22,000-
    acre parcel of land, today known as the Massachusetts Military Reservation (MMR).

    In 1984, the U. S. Geological Survey detected contaminants in the monitoring wells downgradient  of the plant.
    In 1983 and 1984, the Air Force detected volatile organic compounds (VOCs) in on-site monitoring wells near
    the Base Landfill and Current Fire Training Area. Monitoring by the Air National Guard and the State
    Department of Environmental Quality has detected VOCs in more than 200 private wells.

    TSC reviewed the Focused Feasibility Study for Landfill-1 (draft) to address several issues including evaluating
    the evidence that: natural attenuation of chlorinated ethenes was occurring in the aquifer downgradient of
    Landfill-1, natural attenuation would be sufficient as a sole remedy for managing the plume of contaminated
    groundwater emanating from Landfill-1, active remedial measures (such as pump-and-treat) would inhibit

-------
    biodegradation of chlorinated ethenes, decreasing concentration trends are the result of installation of a landfill
    cap instead of natural attenuation, and finally, reviewed the cost estimates of various remedial alternatives.  In
    spite of the extremely short review period, the TSC (INEEL) participated in two meetings at the site with
    regulators and the Air Force, as well as numerous tele-conferences in which natural attenuation and other
    remedial alternatives were discussed. At the request of Region I, a series of documents was provided that
    describe a groundwater remediation program at the INEEL Test Area North facility. The TSC reviewed the
    addendum to the focused feasibility study for Landfill-1 and participated in a number of
    tele-conferences and attended a meeting to discuss TSC comments and suggestions.  The RPM provided the
    TSC with extraction/treatment system data for review. The TSC received a request to assist hi the
    establishment of conservative soil concentration for explosive residues and other contaminants based on
    leaching to groundwater.  An evaluation of the SESOIL Model was completed. In addition, a data report titled
    "Soil Action Levels for Massachusetts Military Reserve Northern Impact Area" was provided to the Region.

    The TSC was requested to review DoD's site specific fate and transport measurement Task 2000.  The TSC
    completed a review of the modeling portion of the RI for the chemical spill-19 (CS-19) area. The TSC
    calculated some additional soil screening concentrations that were provided to the Region. TSC reviewed
    "Contaminant of Concern Identification Demolition Area 1" and the "Draft Modeling Strategy for the Camp
    Edwards Impact Area Groundwater Quality Study." The TSC responded to a request dealing with a fate and
    transport model and attenuation factors and provided the report titled "Contaminant of Concern Identification
    for Demolition Area 1 Soil Operable Unit of the Camp Edwards Impact Area, Massachusetts Military
    Reservation, Cape Cod, MA." The TSC received some additional information from the Region pertaining to
    RDX soil cleanup levels.

•   Project Name: Savage Well
    Site: Savage Well Municipal Water Supply OU-2 S. F. Site
    Site ID:

    Type Lead:
    Requested by: Richard Goehlert (617) 918-1335
    Lead Scientist: Lance Peterson (208) 528-8718 x!70, Bob Starr (208) 526-0174

    Start Date: May 1999
    Expected Completion Date: December 1999
    Revised Completion Date: September 2002

    Estimated Budget: $20,000                                  Total Expenditures:$29,697
    Revised Budget: $38,000                                    Total FY02 Expenditures:$2.571
    Major Contaminants: Organics                               Total 2nd Qtr. Expenditures:$471

    The RPM requested that the ESD-LV TSC provide assistance hi reviewing aquifer models that are and/or will
    be used to determine appropriate remedial approaches.

    The Savage  Well site covers about 30 acres west of the center of Milford, NH and consists of a municipal well.
    The underlying aquifer, the water-bearing layer of rock and gravel from which the Town of Milford gets its
    water.  The Savage Municipal Well site operated from 1960 to 1983, during which time it supplied 40% to 45%
    of Milford's water. The remainder of the water came from the Keyes and Kokko Wells. During Savage's years
    of operation, several metal industries opened plants near the well along the Souhegan River. Investigations at
    the site identified the source of contaminants, which also were present hi water samples taken at the nearby
    industries.

    The groundwater is contaminated with VOCs, including TCE and vinyl chloride and heavy metals, including
    lead, chromium, and mercury. The soil is contaminated with VOCs.  The stream on site is contaminated with

-------
    VOCs and lead. As previously identified the TSC has been involved at OU-1 with the "Surfactant-Enhances
    Aquifer Remediation of PCE at Neutral Buoyancy" Project."

    The PRPs have modeled the Savage Well aquifer and evaluated several remedial scenarios. They have come to
    the conclusion that monitored natural attenuation remedy will result in a clean aquifer hi about the same time as
    an engineered remedy. This does not seem to make sense given the complexity of the aquifer and the broad
    extent of contamination in OU-2.  OU-1 is a fund lead slurry wall, with pump and treatment system, SVE air
    sparging, and air stripping.  OU-2 is a dissolved plume downgradient from the OU-1 area.

    Numerous reports were received on hydrologic modeling of Savage Well OU-2 site. The hydrologic site
    conceptual model  review and a numerical model review were completed.  Questions and comments were
    formulated.  The TSC has performed an initial review on the QST Draft Modeling report and the Remedial
    Design Report. The modeling review was completed and the report titled "Comments Regarding Modeling and
    Interpretations on  the OU-2 Savage Well Site" was provided to the Region.  The TSC received the  1999 USGS
    groundwater modeling report. The report was reviewed and was considered satisfactory.  Discussion with the
    RPM pertaining to the transport models "ModFlow" and ModFlow/MTSD occurred.

    The TSC  reviewed the document "An Evaluation of June and August 2000 Sampling Results: Biotic
    Transformation of Chlorinated Organic Compounds Within the Extended Plume, Savage Well ESE." A
    number of conference calls pertaining to modeling questions were held with the RPM.  Following a review of
    an ES&E Nov. 2000 Draft Report, the TSC provided the Region with the report titled "Draft Evaluation of June
    and August 2000 Sampling Results: Biotic Transformations of Chlorinated Organic Compounds Within the
    Extended Plume." The TSC responded to a request from the RPM pertaining to the use of diffusion sampling
    procedures to identify vertical contaminant zones in long-screened wells.

•   Project Name: South Weymouth
    Site: South Weymouth Naval Air Station S. F. Site
    Site ID:

    Type Lead:
    Requested by: Cynthia Hanna (617) 918-1446 Patti Whitemore (617) 894-3234
    Lead Scientist: Anita Singh (702) 8973234

    Start Date: July 1998
    Expected Completion Date: March 1999
    Revised Completion Date: August 2002

    Estimated Budget:$ 10,000                                   Total Expenses:$35,403
    Revised Budget:$45,000                                    Total FY02 Expenses:$4,552
    Major Contaminants: Metals/Acids                            Total 2nd Qtr. Expenses:$4,552

    The Regional RPM requested that the ESD-LV TSC provide assistance in a statistical assessment of false
    positive and false negative data as defined and used in the site's QAPP. South Weymouth Naval Air Station
    (SWNAS) is located at the southern end of Weymouth, Norfolk County, Massachusetts. SWNAS is
    approximately 1500 acres in size. Station generated waste is disposed of in three on-site landfills. The West
    Gate landfill operated from 1969 to 1972, The Rubble Disposal area and the Small landfill operated from 1972
    until the mid 1980's. Flammable liquid wastes were reportedly burned in the on-site fire fighting training area.
    Small amounts of  waste battery acid, possibly containing lead, may have been disposed of in a site leach field.

    The TSC reviewed the QAPP and site data. Following the review and site documents assessment the TSC
    provided the Region with the report titled "Review of Statistical Approached Proposed for South Weymouth
    Superfund Site." Following a review of additional data, the TSC provided the Region with two reports titled "

-------
    Review of Statistical Approaches Proposed for the South Weymouth Naval Air Station NPL Site" and "Review
    Comments on the Approach Proposed by the Navy for Background and Review Action Item Concentration
    Comparison, South Weymouth NPL Site.) Following a PRP/EPA conference call an additional assessment of
    site data was prepared and the report titled "Review of Statistical Approaches Proposed for South Weymouth
    Naval Air Station NPL Site, 5-19-99 was provided to the Region. In July, the TSC was provided a Phase II
    BBS-Data Analysis Update-RTN-#3-2621, dated July 7, 1999. Following a review of additional site date and
    documents, the TSC provided the following  reports to the Region ":Use of SWNAS Background Data Set for
    Evaluation of the Environmental Base Line Study Item Area Data" dated December 9,  1999 and "Background
    Data Set Development for NAS South Weymouth Revision No. 2".  A number of letter reports were provided
    to the Region. These reports included comments on the draft human health risk assessment work plan,
    background UPL computations and the issue of outliers.  The TSC is currently reviewing the PRP's approach
    for the background screening comparison used for the "small landfill."

    The TSC completed a review of a PRP proposed statistical approach for assessing risk. Following a number of
    conference calls the TSC participated in finalizing the "Statistical Design Criteria for NAS South Weymouth
    EBS Phase II Streamlined Risk Assessments. Because of the possible use of a solid phase electron donor to
    remediate site groundwater the RPM was provided with information and a proposal that may assist in the
    biological degradation of the contamination.

•   Project Name: Union Chemical
    Site: Union Chemical Company S. F. Site
    Site ID:

    Type Lead:
    Requested by: Terry Connelly (617) 918-1373
    Lead Scientist: Lance Peterson (208) 528-8718 x!70 Jennifer Martin (208) 528-8718 x!47

    Start Date: October 2001
    Expected Completion Date: July  2002
    Revised Completion Date:

    Estimated Budget:$20,000                                  Total Expenditures:$23,027
    Revised Budget:$35,000                                    Total FY02 Expenditures:$2,606
    Major Contaminants: Organics                              Total 2nd Qtr. Expenditures^ 1,006

    The Regional RPM requested that the ESD-LV TSC provide assistance in reviewing a closure  plan for
    groundwater.

    The Union Chemical Company, located in South Hope, Maine, occupied approximately twelve acres in a rural
    residential area, with most of the  activities occurring within a two-acre portion of the property. The business
    began operations in 1967 as a paint stripping and solvent manufacturing business. The company subsequently
    expanded to include recycling of used stripping compounds using a distillation unit. The operation further
    expanded, first with an on-site boiler and the fluidized-bed incinerator to treat the hazardous wastes.
    Groundwater and surface water contamination was first discovered hi 1979. EPA and Maine DEP performed a
    removal action in 1984, taking offsite the contents of over 2000 55 gallon drums and 28 liquid storage tanks.
    Maine DEP closed the hazardous waste treatment at the site in June  1984. The RI, performed  in 1987 - 1988,
    delineated contamination horizontally and vertically throughout the two-acre portion. The FS  established
    depths for remediation, typically  to the water table for most of the site, and six feet beneath the water table in an
    area between a leach field and interceptor trench.

-------
    The TSC received a number of documents (i.e. "Declaration for the Explanation of Significant Differences" and
    is currently reviewing them. Following an initial review of the provided documents the TSC and the INEEL
    scientists participated in a number of conference calls with the RPM.

REGION 2

•   Project Name: Caldwell
    Site: Caldwell Trucking Co. S. F. Site
    Site ID:

    Type Lead:
    Requested by: Jon Josephs (212) 637-4317 Rick Robinson (212) 637-4371
    Lead Scientist: Kent Sorenson (208) 528-8718 x!20, Lance Peterson (208) 528-8718 x!70

    Start Date: December 2001
    Expected Completion Date: July 2002
    Revised Completion Date:

    Estimated Budget:$ 15,000                                    Total Expenditures:$3,232
    Revised Budget:$                                           Total FY02 Expenditures:$3,232
    Major Contaminants: Organics/Inorganics                      Total 2nd Qtr. Expenditures:$732

    The Regional RPM requested that the ESD-LV TSC provide assistance in reviewing a remedial design work
    plan for a bioremediation system for contaminated bed rock.

    This 11-acre site, located in Fairfield Township,  N. J., is on an extensive 100-year flood plain of the Passaic
    River. From the 1950's to 1984 septic wastes were deposited in unlined lagoons and later in steel holding tanks.
    EPA investigations indicated on-site soil and a municipal well were contaminated with VOCs, PCBs and
    metals. Groundwater remains contaminated because of a TCE-contaminated plume which extends 4,000 feet
    toward the river.

    A second remedial action addresses off-site groundwater contaminated with VOCs including TCE. The
    selected remedy includes pumping and treatment of off-site groundwater using air stripping with off-site
    discharge to the river; installation of a drainage system to eliminate surface exposure to contaminated
    groundwater; sealing groundwater wells; and groundwater monitoring.

    The TSC received the document titled "Caldwell Trucking Fate and Transport of Chlorinated Ethanes" for
    review.  Because of the similarities between the Caldwell Trucking site and the sub-surface contamination at
    INEEL, the RPM was provided a sampling and analysis plan that has been used in the in-situ bioremediation
    project at INEEL for possible use at the Caldwell site.

•   Project Name: Ciba
    Site: Ciba-Geigy S. F. Site
    Site ID:

    Type Lead:
    Requested by: Marian Olsen (212) 637-4313
    Lead Scientist: Anita Singh (702) 897-3234

    Start Date:
    Expected Completion Date: July 1998
    Revised Completion Date: August 2002

-------
Estimated Budget:$ 10,000
Revised Budget:$20,000
Major Contaminants: Organics
Total Expenses:$ 12,883
Total FY02 Expenses:$4,040
Total 2nd Qtr. Expenses:$4,040
The Regional RPM requested that the ESD-LV TSC provide assistance in reviewing statistical approaches that
are being utilized by the PRP to assess Ciba-Geigy data for site characterization and remedial purposes that are
being utilized by the PRP to assess Ciba-Geigy data for site characterization and remedial purposes.

This 1400-acre site includes 320 acres of developed area and a remaining wooded area.  The manufacturing
facility which has operated since 1952 is composed of numerous buildings, an industrial waste water treatment
plant, and a lined reservoir for emergency storage of treated and untreated waste water.  Chemicals have been
disposed of on-site in a number of locations, including a 5.2-acre drum disposal area, a 3.9 acre lime sludge
disposal area used for disposal of inorganic wastes, a 12-acre filter cake disposal area which received sludge
from the water treatment, 8.5 acres of backfilled lagoons, and a calcium sulfate disposal area. In 1978, the
drum and lime sludge disposal areas were closed, as was the filter cake disposal area. Currently, contaminants
are present in leaking drums, waste sludge, soil and groundwater. Groundwater contamination is migrating
from these inactive disposal sites toward the river. The primary contaminants of concern addressed in this
operable unit affecting the groundwater are VOCs including PCE, TCE.  and toluene; and metals including
arsenic and chromium. A review of the geostatistical approach that will be implemented at the site was
completed.  The TSC attended a meeting with the RPM and PRP's. The RP{M  requested cost recovery
documents. The TSC received the" Draft CTM Calibration Report Toms River  Site Operable Unit 2 from the
RPM and was requested to review the section on geostatistics. In April following the review of this section the
TSC provided the Region appropriate comments and suggestions.

The TSC reviewed a childhood cancer study and provided the Region with comments and suggestions in the
report titled "Review of Draft Case-Control Study of Childhood Cancers  in Dover Township (Dover Township
(Ocean County), New Jersey.

Project Name: Cornell
Site: Cornell Dubilier S F. Site
Site ID:

Type Lead:
Requested by: Marian Olsen (212) 637-4313
Lead Scientist: Anita Singh (702) 897-3234

Start Date: July 2001
Expected Completion Date: April 2002
Revised Completion Date: August 2002
Estimated Budget:$ 15,000
Revised Budget:$25,000
Major Contaminants: Organics
Total Expenditures:$23,188
Total FY02 Expenditures:$ 15,467
Total 2nd Quarter Expenditures: $11,867
The Regional RPM requested that the ESD-LV TSC provide assistance in computing the EPC Risk Term.

The Cornell Dubilier Electronics Inc. is located in South Plainfield, New Jersey. The Region II risk assessor
utilized ProUCL to assess site data. Following the assessment it was recommended in the ProUCL User Guide
that "advanced statistical analysis" be completed.

The TSC completed the necessary statistical tests on site data and provided the Region with the report titled
"Computation of EPC Term for Risk Assessment."  The TSC provided the Region with the report titled

-------
    "Computation of a UCL for 1,1-biphenyls, Cornell Dubilier Site."  During the FY02 Second Quarter the TSC
    received four data Sets to compute the EPC terms.  Following a review and statistical analysis of the data sets
    the TSC provided the report titled "Computation of the EPC terms for Cornell-Dubilier Electronics Site" to the
    RPM.

•   Project Name: Diamond Head
    Site: Diamond Head Oil Refinery
    Site ID:

    Type Lead:
    Requested by: Marian Olsen, Toxicologist, (212) 637-4313
    Lead Scientist: Anita Singh (702) 897-3234

    Start Date: June 2001
    Expected Completion Date: November 2001
    Revised Completion Date: April 2002

    Estimated Budget: $15,000                                  Total Expenditures^ 13,770
    Revised Budget:                                            Total FY02 Expenditures:$4,450
    Major Contaminants: Inorganics                              Total 2nd Qtr. Expenditures :$ 186

    The RPM requested that the ESD-TSC provide assistance in designing a soil sampling/monitoring approach to
    characterize soil and subsurface contaminants.

    The Diamond Head Oil Refinery site is located in Kearney, Hudson County, New Jersey. Currently, the site is
    inactive and consists of approximately 15 acres of undeveloped land.  The site is comprised of wetland areas
    and drainage ditches, a small wetland/pond, a vegetated landfill area along the western border of the site, and
    the remnants of the former Diamond Head Oil Refinery on the eastern portion of the site. The abandoned
    refinery portion of the site contains various construction debris, including foundations of the former on-site
    building and two former aboveground storage tanks. The site is currently owned by the Hudson Meadows
    Urban Development Corporation (HMURDC). During facility operations, two aboveground storage tanks and
    possible underground pits were used to store oily wastes. These wastes were intermittently discharged directly
    to adjacent properties, including  the wetland area to the south of the site, creating an oil lake.

    The TSC reviewed provided data. Following the data review a sampling/monitoring plan titled "Draft Soil
    Sampling Plan for Diamond Head Oil Refinery Kearney, New Jersey" was provided to the Region.  Additional
    support is anticipated.

•   Project Name: Billiards
    Site: Hilliards Creek S. F. Site
    Site ID:

    Type-Lead:
    Requested By: Emmet Keveney (212) 637-3916
    Lead Scientist: A. K. Singh (702) 895-1439

    Start Date: May 2001
    Expected Completion Date: October 2001
    Revised Completion Date: September 2002

    Estimated Budget: $6,000                                    Total Expenditures:$4,000
    Revised Budget: $                                           Total FY02 Expenditures^ 1,600

-------
    Major Contaminants: Lead                                   Total 2nd Qtr. Expenditures:$500

    The RPM requested that the ESD-LV TSC provide assistance in evaluating the geostatistical approaches that
    are being used by the PRP's.

    The Milliard's Creek site is a vacant, unfenced site in the Borough of Gibbsboro, Camden County, New Jersey,
    including the stream channel, watershed and wetland areas along Hilliard's Creek.  Hilliard's Creek is a small
    stream that runs in a southwesterly direction for approximately 1-mile where it joins the Cooper River.

    The TSC reviewed the Roy F. Weston document titled "Technical Memorandum Derivation of Sample Grid
    Spacing" and provided the Region with comments and suggestions pertaining to the geostatistical approaches
    being suggested. Based on TSC comments the PRP's had a number of questions pertaining to the
    sampling/monitoring design. The TSC participated in a conference call and addressed all RPM and PRP
    comments and questions.  The TSC responded to a number of questions pertaining  to grid sizes for sampling
    and kriging analysis.  The TSC was requested to perform geostatistical analysis and provide kriged maps of site
    contaminants. The TSC is currently reviewing provided data.

•   Project Name: Hooker
    Site: Hooker Chemical/Ruco Polymer S. F. Site
    Site ID:

    Type-Lead:
    Requested By: Syed Quadri (212) 637-4233
    Lead Scientist: Kent Sorenson (208) 526-9597

    Start Date: February 1999
    Expected Completion Date: September 1999
    Revised Completion Date: September 2002

    Estimated Budget: $ 35,000                                  Total Expenditures:$34,683
    Revised Budget: $50,000                                     Total FY02 Expenditures^ 1,982
    Major Contaminants: Organics                                Total 2nd Qtr. Expenditures^ 1,332

    The RPM requested that the ESD-LV TSC provide assistance in reviewing a number of site documents i.e.,
    treatability study work plan, Remedial Investigation Report for Operable Unit 3 and the Feasibility Study
    Report for Operable Unit 3.

    The site  is located on a 14-acre tract of land in Hicksville, New York. The site includes two main production
    plants, a pilot plant located between these plants, a warehouse building, an administration and laboratory
    building, numerous above-ground chemical storage tanks and associated pipping, and several recharge basins.
    Since 1946, the facility was used for the production of various polymers, including polyvinyl chloride (PCV),
    styrene/butadiene latex, vinyl chloride/vinyl acetate copolymer, and polyurethane, as well as ester plasticizers.
    The facility is currently active, and manufactures such products as polyester, polyols and powder coating
    resins. During site operations, industrial wastewater from the facility was discharged to six (6) on-site recharge
    basins or sumps. The  wastewater contained, among  other things, vinyl chloride, trichloroethylene, barium and
    cadmium soap. Vinyl acetate, organic acids, and styrene condensate as a result of these releases, groundwater
    downgradient from the site has been contaminated.

    The TSC reviewed the Predesign Work Plan for Operable Unit I with a specific  focus on the Treatability Study
    Work Plan (Appendix C).  Comments were provided within two days of receipt of the document.  Significant
    deficiencies were noted in the Treatability Study Work Plan. Recommendations for resolution of the
    deficiencies were made in the review comments and discussed on a conference call with EPA Region II and the

-------
PRPs. An additional review was completed on the Remedial Investigation Report Operable Unit-3. The report
summarized existing data and the reviewers agreed with recommendations for additional monitoring of wells.
The reviewers did not agree with the conclusion that the existing data was adequate for a section of a final
remedy and recommendations were made for additional data needs to fully evaluate remediation alternatives.

The TSC reviewed and provided comments pertaining to the report "Feasibility Study for Operable Unit-3
Vinyl Chloride Sub-Plume in the Vicinity of MW-S2 Hicksville, New York-KS-0599 and LMP-05-99". The
TSC supplied comments to the RPM on an  Interim Remedial Measures plan that calls for additional
characterizing and preliminary tests to support biosparging at the Hooker/Ruco site.  This work would be
performed concurrently with finalization of the RI/FS and drafting of the ROD. A review of the comment
responses provided by OXY for the Hooker/Ruco site RI and FS reports was completed and provided. At the
request of Mr. Quadri the groundwater treatability study report was reviewed and the TSC completed a review
of the comment responses on the RI and FS reports provided to the EPA by OXY for the Hooker/Ruco site.
TSC transmitted written comments on the Groundwater Treatability Study Report and the In Situ Chemical
Oxidation Work Plan as well as a summary of the reviews of comment responses on the RI/FS documents. A
number of conference calls between the TSC scientists, the RPM and the PRP's were completed. The TSC
provided input into the sampling methods that will be performed during installation of wells for the pre-design
activities associated with OU-3. The TSC reviewed and provided comments to the RPM on the remedial
investigation report OU-3. Following the PRP's revision of the "Feasibility  Study Document for OU-3" the
TSC reviewed the revised version and provided some additional recommendations.

The TSC was requested to review public comments and Northrop Grumman responses.  The following two
reports were provided to the Region: "Responses to Public Comments on the Proposed Plan for the Vinyl
Chloride Sub-plume at the Hooker Chemical/Ruco Polymer Plant in Hicksville, New York" dated
September 13, 2000, and "Proposed Response to Northrop Grumman Corporation Comments dated August 28,
2000 on the Operable Unit-3 Proposed Remedial Action Plan for the Hooker/Ruco Site, Hicksville, New York"
dated September 18, 2000. A number of conversations with the RPM occurred pertaining to TSC comments
and suggestions. A workshop on fractured  rock was  attended by a TSC representative. The TSC provided
comments and suggestions on the OU-3 proposed remedial action plan. The TSC participated in a number of
conference calls with the RPM. Following  a review of site documents, the TSC provided the RPM the report
titled "Review and Comment Summary - Enhancements to Biosparge Pre-design Testing, Operable Unit-3,
Vinyl Chloride Subplume, Hooker Chemical/Ruco Polymers Site, Hicksville, New York."

Project Name: Liberty
Site: Liberty Industrial S.  F. Site
Site ID:

Type-Lead:
Requested By: Damian Duda (212) 637-4269, Lorenzo Thantu (212) 637-4240
Lead Scientist:  Robert Starr (208) 526-0184

Start Date: July 2000
Expected Completion Date: January 2001
Revised Completion Date: May 2002

Estimated Budget:$40,000                                  Total Expenditures:$32,148
Revised Budget:$75,000                                    Total FY02 Expenditures^ 1,812
Major Contaminants: Volatile Organics                       Total 2nd Qtr. Expenditures:$608

The RPM requested that the ESD-LV TSC provide assistance in the measurement of chlorinated organic
isotopes in groundwater to determine possible sources of Volatile Organic Compounds (VOC's) in the
groundwater system.

                                            10

-------
    Liberty Industrial Finishing site located in Farmingdale, NY is an abandoned site covering less than an acre on
    a 7 'A-acre tract of land in an industrial park. From 1948 to 1978, the company carried out electroplating,
    dyeing, and painting operations at the site. The contaminated areas consist of three acid vats, a sludge drying
    lagoon, two leaching basins, a number of finishing vats, and a basin for holding storm water. In  1977, the State
    found Liberty in violation of the discharge limits of its permit. Liberty was ordered to clean up the site in 1978,
    but did not do so. As an initial action, the company, under State supervision, removed contaminated soils and
    sledges from the leaching basins, the storm water basin, and the sludge lagoon. Groundwater and soils are
    contaminated with heavy metals including cadmium and chromium. People who drink water from
    contaminated wells may be at risk.

    Following a number of conference calls with the RPM the TSC provided information on "isotopic signatures"
    via the document titled "Literature Review: Stable Isotopic Signatures for Chloroethane Source and Progress
    Identification." The TSC also arranged with the Environmental Isotope Laboratory at the University of
    Waterloo to analyze site samples. The TSC prepared the QAPjP which was provided to the Region for review.
    The TSC received QAPjP review comments from the Region and is currently incorporating the comments. A
    final QAPjP will be completed during FY2002. The TSC has corresponded with the Waterloo laboratory
    pertaining to  the QAPjP and technical procedure for the isotopic analysis.

•   Project Name: Reich Farms
    Site: Reich Farms S. F. Site
    Site ID:

    Type Lead:
    Requested by: Jon Gorin (212) 637-4361, Marian Olsen (212) 637-4313
    Lead Scientist: Anita Singh (702) 897-3234, J. Martin (208) 528-8718 x!47, Molly Leecaster (208) 526-4251

    Start Date: June 2000
    Expected Completion Date: October 2000
    Revised Completion Date: August 2002

    Estimated Budget: $15,000                                  Total Exps:$98,217      PC&B:$10,251
    Revised Budget: $ 105,000                                   Total FY02 Exps:$4,251   PC&B:$800
    Major Contaminants: Organics                               Total 2nd Qtr. Exps:$4,169 PC&B:$800

    The RPM requested that the ESD-LV TSC provide assistance in determining the numbers and locations of
    sampling locations that are necessary to characterize site contaminants. Previous support by the TSP included
    special analytical analysis of site samples.

    The Reich Farm site is an open, relatively flat, sandy area covering approximately 3 acres in Dover Township,
    New Jersey.  The site is surrounded by commercial facilities and wooded area. During a 5 month period, the
    site was leased from the Reich Farm owners by an independent waste hauler and used illegally for the disposal
    of drums containing organic solvents, still bottoms, and residues from the manufacturing of organic chemicals,
    plastics and resins. In December 1971, the owners of the property discovered approximately 4,500 drums
    containing wastes on a portion of land that they had rented  out.  These drums bore labels indicating that they
    belonged to the Union Carbide Corporation.  The TSC has been requested to assist in developing a sampling
    plan for soils  using "Punch Technology."

    The TSC completed a review of site reports and held a conference call with the RPM to clarify the specific
    goals of the soil sampling effort. The RPM stated that he wanted a sampling plan that would generate the
    appropriate data to determine if the concentrations of "SAN trimer" in the soil column were low enough to
    delist the soil at the site. The TSC provided the Region with a document titled "Draft Reich Farm Sample
    Design Scenarios." A number of discussions about the "Design Scenarios" with the RPM occurred. The TSC

                                                 11

-------
    incorporated Regional comments and suggestions and provided the RPM with a final field sampling plan.  The
    TSC evaluated data and models that will be used to assess contaminant exposure to human beings.  Following
    thid review, the TSC provided the Region with the report titled "Review of Draft Case-Control Study of
    Childhood Cancers in Dover Township (Ocean County), New Jersey."

•   Project Name: Route 561
    Site: Route 561 Dump S. F. Site
    Site ID:

    Type Lead:
    Requested by: Emmet Keveney (212) 637-3916
    Lead Scientist: A. K. Singh (702) 895-1439

    Start Date: May 2001
    Expected Completion Date: July 2002
    Revised Completion Date:

    Estimated Budget:$6,000                                    Total Expenditures:$3,049
    Revised Budget:$                                           Total FY02 Expenditures^ 1,249
    Major Contaminants: Lead                                   Total 2nd Qtr. Expenditures:$200

    The RPM requested that the ESD-LV TSC provide assistance in evaluating the geostatistical approaches that
    are being proposed by the PRP's.

    Route 561 Dump is located on a vacant 2.9 acre parcel in a suburban area of Gibbsboro, New Jersey. The
    property is bounded by a strip mall to the north, Clement Lake to the east, Route 561 to the west, and vacant
    land to the south. The White Sand Branch (and its associated wetlands), which originated at the outlet of
    Clement Lake, flows south through the site property. The site was previously used as a paint waste dump.
    Operations of the plant, which was not located on the site property, included the manufacturing of varnishes,
    lacquers,  and paints, including dry colors, paste paints, ad linseed oil liquid paints.  In August 1995, the EPA
    collected surface and subsurface soils samples from the site property as well as sediment samples from the
    White Sand Branch. Analysis of these samples indicated the presence of inorganic contaminants in the on-site
    soil and downstream sediment samples.

    The TSC reviewed the Roy F. Weston document titled "Technical Memorandum Derivation of Sample Grid
    Spacing" and provided the Region with comments and suggestions pertaining to the geostatistical approaches
    being suggested. Based on TSC comments the PRP's had a number of questions pertaining to the
    sampling/monitoring design. The TSC participated in a conference call and  addressed all RPM and PRP
    comments and questions. The TSC responded to a number of questions pertaining to grid sized for sampling
    and kriging analysis.  The TSC was requested to perform geostatistical analysis and provide kriged maps of the
    site contaminants.  The TSE is currently reviewing the provided data.

•   Project Name: Solvent
    Site: Solvent Savers S. F. Site
    Site ID:

    Type Lead:
    Requested by: Lisa Wong (212) 637-4267
    Lead Scientist: Ken Moor (208) 526-8810 Bob Starr (208) 526-0184

    Start Date: January 2002
    Expected Completion Date: August 2002

                                                 12

-------
    Revised Completion Date:

    Estimated Budget:$ 10,000                                   Total Expenses:$
    Revised Budget:$                                           Total FY02 Expenses:$
    Major Contaminants: PCB's and Metals                        Total 2nd Qtr. Expenses:$

    The Regional RPM requested that the ESD-LV TSC provide assistance in reviewing the PRPs suggested
    approaches for remediating soil PCB concentration.

    This 13-acre  site located in Lincklaen, N. Y. was operated as a chemical waste recovery facility from 1967 to
    1974.  The operation involved distilling waste industrial solvents to recover solvents for reuse. A 1990 removal
    action resulted in the disposal of over packed drums.  The purpose of this remedial action is to prevent exposure
    to contaminated soil, to ensure protection of human health, and to restore the groundwater.  The primary
    contaminants of concern affecting soil and groundwater are organics, PCBs and metals.

    The TSC is currently reviewing the PRPs suggested remedial approach.

•   Project Name: Stanton
    Site: Stanton Cleaners S. F. Site
    Site ID:

    Type-Lead:
    Requested By: Damian Duda (212) 637-4269, Lou DiGuardia (732) 906-6927
    Lead Scientist: Robert Starr (208) 526-0174

    Start Date: July 2000
    Expected Completion Date: January 2001
    Revised Completion Date: May 2002

    Estimated Budget:  $45,000                                  Total Expenditures:$33,996
    Revised Budget:$                                           Total FY02 Expenditures^ 1,435
    Major Contaminants: Volatile Organics                        Total 2nd Qtr. Expenditures:$708

    The RPM requested that the ESD-LV TSC provide assistance in the measurement of chlorinated organic
    compounds (VOC's) in the groundwater system.

    The Stanton Cleaners area groundwater contamination site is located in the area of Stanton Cleaners, which is
    an active dry cleaning facility located at 110 Cutter Mill Road in a commercial area of Great Neck, Nassau
    County, New York. The facility is bordered to the west by Cutter Mill Road, to the north and east by indoor
    tennis  courts, and to the south by a gasoline station. Due to elevated groundwater levels of PCE, NCDH
    ordered Stanton Cleaners to conduct a subsurface soil and groundwater investigation at the site. The site was
    referred to NYSDEC in January 1984. As a result of the subsequent investigations conducted at the site, a
    plume of contaminated groundwater, consisting primarily of PCE, had been documented to be migrating from
    the site. PCE was detected in groundwater samples at concentrations exceeding the State and Federal
    maximum contaminant level (MCL) of 5 micrograms per liter (ug/L).

    Following a number of conference calls with the RPM the TSC provided information on  "isotopic signatures"
    via the document titled "Literature Review: Stable Isotopic Signatures for Chloroethane Source and Progress
    Identification." The TSC also arranged with the Environmental Isotope Laboratory at the University of
    Waterloo to analyze site samples. The TSC prepared the QAPjP for the analysis and the data assessment
    protocol. The QAPjP's was provided to the Region for review. The TSC received QAPjP review comments
    from the Region and is currently incorporating the comments.  A final QAPjP will be completed during

                                                 13

-------
    FY2002.  The TSC has corresponded with the Waterloo Laboratory pertaining to the QAPjP and the technical
    procedures for the isotopic analysis.

•   Project Name: United States
    Site: United States Avenue Burn S. F. Site
    Site ID:

    Type Lead:
    Requested by: Emmet Keveney (212) 637-3916
    Lead Scientist: A. K. Singh (702) 895-1439

    Start Date: May 2001
    Expected Completion Date: August 2002

    Estimated Budget:$7,000                                     Total Expenditures:$3,339
    RevisedBudget:$                                           Total FY02 Expenditures:$l,150
    Major Contaminants: Lead                                    Total 2nd Qtr. Expenditures:$350

    The RPM requested that the ESD-LV TSC provide assistance in evaluating the geostatistical approaches that
    are being proposed by the PRP's.

    This site, located in Gibbsboro, New Jersey, is contaminated with paint wastes that pose a potential threat to
    public health through direct contact with the materials and also endanger the environment. From the mid
    1800's to 1967, John Lucas and Company operated a paint manufacturing facility at a separate location in
    Gibbsboro.  The Lucas manufacturing operations were acquired by the Sherwin-Williams Company in 1967,
    which operated the facility until its closure in  1977. The Burn Area was used as disposal and burn site for paint
    wastes, municipal waste and the storage of sludge generated from the former paint manufacturing facility's
    wastewater treatment plant.

    The TSC reviewed the Roy F. Weston document titled "Technical Memorandum Derivation of Sample Grid
    Spacing" and provided the Region with comments and suggestions pertaining to the geostatistical approaches
    being suggested.  Based on TSC comments the PRP's had a number of questions pertaining to the
    sampling/monitoring design. The TSC participated in a conference call and addressed all RPM and PRP
    comments and questions. The TSC responded to a number of questions pertaining to sampling grid sizes for
    sampling and kriging analysis.  The TSC was requested to perform geostatistical analysis and provide kriged
    maps of the site contaminants. The TSC is currently reviewing provided data.

REGION 3

•   Project Name: Big John
    Site: Big John Savage Hoult Road S. F. Site
    Site ID:

    Type Lead:
    Requested by: Hilary Thornton (215) 814-3323
    Lead Scientist: Russell Plumb (702) 897-3265, John Zimmerman (702) 897-3379

    Start Date: March 2002
    Expected Completion Date: September 2002
    Revised Completion Date:

    Estimated Budget:$22,000                                    Total Expenses:$471

                                                 14

-------
    Revised Budgets                                           Total FY02 Expenses:$471
    Major Contaminants: Organics/Coke/Tars                     Total 2nd Qtr. Expenses:$471

    The Regional RPM requested that the ESD-LV TSC provide assistance in reviewing site documents and
    analytical results that were completed to fingerprint contaminants and identity the source of contamination.

    Big John Salvage Hoult Road Site is located on the east side of Fairmont, Marion County, West Virginia on the
    east bank of the Monongahela River. The Sharon/Steel/Fairmont Coke Superfund Site borders the site to the
    east. The site was owned by Reilly Tar and Chemical Corporation (RTCC) from 1932 to 1973. Approximately
    12,000 gallons of crude tar waste from the nearby Domestic Coke Corporation and Dupont Coke Plant were
    processed at the site daily from 1932 until 1957. Wastes generated during the above years were retained in a
    pond near the southern property line or disposed on in various areas on site. The pond also received wastes
    from the three on-site sewers and several drainage ditches. All cooling waters, acid wastes, and tar wastes were
    supposed to pass through the pond.  Discharge from the retention flowed through a pipe into an unnamed
    tributary which emptied into the Monongahela River.

    The TSC is currently reviewing site data.

•   Project Name: Chem Solve
    Site: Chem Solve Inc. S. F. Site
    Site ID:

    Type Lead:
    Requested by: Debra Rossi
    Lead Scientist: A. K. Singh (702) 895-1439

    Start Date: February 1999
    Expected Completion Date: August 2001
    Revised Completion Date: May 2002

    Estimated Budget:  $10,000                                   Total Exps:$ 12,062      PC&B:$1,400
    Revised Budget: $20,000                                    Total FY02 Exps:$2,000  PC&B:$600
    Major Contaminants: Organics                               Total 2nd Qtr:$500      PC&B:$600

    The RPM requested that the ESD-LV provide assistance in assessing the attainment of cleanup goals for a
    number of organic  contaminants in site groundwater.

    This site located in Dover, Delaware served as a solvent distillation facility beginning  in 1982.  The facility
    recycled waste solvents by placing a drum on an electric coil heater, which distilled the solvents into a second
    drum. The contents of the second drum were filtered into a third drum, and the distilled residues stored on-site.
    In 1984, an explosion and fire at the site destroyed the entire distillation facility.  The groundwater, soil, and
    one residential well is contaminated with VOCs from site waste disposal practices. The primary threat to
    human health is drinking the contaminated groundwater.

    After receiving the data the TSC completed initial data assessment calculations and provided the Region with a
    report addressing the attainment of cleanup goals. The TSC completed additional statistical assessments of site
    data. A letter report identifying the statistical approaches and results obtained was provided to the RPM. The
    TSC was asked to review and respond to some data assessment approaches that will be implemented.  The TSC
    reviewed the suggested approaches and provided comments and suggestions to the RPM. A number of
    conference calls pertaining to statistical tests were completed and explanations pertaining to trend analysis was
    provided to the RPM. The TSC received a request for statistical information from the  State of Delaware. The
    TSC provided the requested information. The TSC received TCE groundwater data and provided the Region

                                                 15

-------
    with a statistically based trend analysis. The TSC received additional monitoring data. Following a statistical
    assessment, the TSC provided the Region with a non-parametric statistical analysis.

•   Project Name: Fairmont
    Site: Fairmont Coke Works S. F. Site
    Site ID:

    Type Lead:
    Requested by: Hilary Thornton (215) 814-3323
    Lead Scientist: Russell Plumb (702) 897-3265, John Zimmerman (702) 897-3379

    Start Date: March 2, 2002
    Expected Completion Date: September 2002
    Revised Completion Date:

    Estimated Budget:$22,000                                   Total Expenses:$565
    Revised Budgets                                           Total FY02 Expenses:$565
    Major Contaminants: Organics/Coke/Tars                      Total 2nd Qtr. Expenses:$565

    The Regional RPM requested that the ESD-LV TSC provide assistance in reviewing site documents and
    analytical results that were completed to fingerprint contaminants and identify the source of contamination.

    The Fairmont Coke Works Site is located in Fairmont, Marion County, West Virginia. The site consists of
    approximately 100 acres of adjoining parcels of land. Approximately 50 acres of the site were utilized for coke
    plant operations, waste treatment, and disposal practices. The remaining  50 acres consists of a wooded hillside
    which descends to the Monongahela River, at the southern portion of the site. Site operations included
    manufacturing coke and refining of coke by-products. These by-products included: phenol, ammonium sulfate,
    benzene, coal tar, toluene, xylene, and coke oven gas.
    The TSC is currently reviewing site data and documents.
    Project Name: Langley
    Site: Langley AFB S. F. Site
    Site ID:

    Type Lead:
    Requested by: Stacie Driscoll (215) 814-3368 Kathy Davies (215) 814-3315
    Lead Scientist: Robert Gerlach (702) 897-3293 Mike Roddy (208) 526-8201 Carol Craiglow (208) 526-3106

    Start Date: November 2000
    Expected Completion Date: March 2001
    Revised Completion Date: June 2002

    Estimated Budget: $10,000                                   Total Expenditures:$21,441
    Revised Budget:$30,000                                     Total 2nd Qtr. Expenditures:$300
    Major Contaminants:Inorganics                               Total FY02 Expenditures:$2,394

    The RPM requested that the ESD-LV TSC provide assistance in reviewing a regression analysis that was
    completed by the PRP's contractor for determining the relationship between contaminant concentrations in site
    surface waters and sediments.
                                                 16

-------
    Langley AFB (LAFB) located in Hampton, VA has been an airfield and aeronautical research center since 1917
    and is the home base for the First Tactical Fighter Wing. NASA Langley us a research facility that conducts
    270 operations in 191 buildings and operated 40 wind tunnels.  Wastes generated at LAFB and NASA Langley
    include waste solids, solvents, paint wastes, pesticide containers and rinse waters, photographic wastes, scrap
    metals, used batteries and printed circuit board plating wastes.  PCBs and polychlorinated terphenyls (PCT)
    were used in hydraulic systems, electrical equipment, compressors, and casting operations.

    Following the review of available data the TSC provided the RPM a report titled "Review of Regression
    Analysis for Surface Water vs Sediment Contaminants and Human Health Risk Assessment for Langley Air
    Force Base IRP Site OT-56 Arsenic and Old Waste." The TSC reviewed a conceptual work plan and provided
    the Region with the report titled "Review Comments on Conceptual Work Plan for the Evaluation of
    Groundwater Data, Langley Air Force Base, Virginia." The TSC received comments from the PRP's pertaining
    to the TSC's review of the "Conceptual Work Plan." The TSC reviewed the PRP's  comments and provided a
    letter report that addressed the PRP's comments. Following the PRPs revision of the conceptual work plan, the
    TSC provided the Region with additional recommendations.

•   Project Name: Letterkenny
    Site: Letterkenny Army Depot S. F. Site
    Site ID:

    Type Lead:
    Requested by: Nancy Rios-JaFolla (215) 814-3324, Stacie Driscoll (215) 814-3368
    Lead Scientist: Anita Singh (702) 798-3234

    Start Date: August 1999
    Expected Completion Date: February 2000
    Revised Completion: July 2002

    Estimated Budget: $10,000                                  Total Expenditures^ 18,737
    Revised Budget:$28,000                                     Total FY02 Expenditures:$497
    Major Contaminants:Organics                                Total 2nd Qtr. Expenditures:$400

    The RPM requested that the ESD, TSC provide assistance in statistical data assessment.

    The Letterkenny Army Depot site, near  Chambersburg, PA, covers 250 acres. From 1947 to the present,
    operations at the site have included the maintenance, overhaul, and rebuilding of wheeled and tracked vehicles
    and missiles. These operations have involved the use of large quantities of chlorinated organic solvents and
    cleaning agents.  Some wastes from these operations have been stored and disposed of in the property Disposal
    Office Area (PDO) by land filling and spreading wastes on open ground areas.  Other areas of suspected
    contamination are the drum storage area, oil bum pit, trash burning pits on the site, and possible adjacent
    landfills.  An estimated 17,000 people reside within 5 miles of the site.

    Groundwater beneath the PDO area and surface water, including Rocky Spring Lake, are contaminated with
    chlorinated organic chemicals including chloroform and trichloroethylene (TCE), according to tests conducted
    by the Army. Soils have been contaminated by xylene, heavy metals, chloroform, and organic compounds.

    The Region had four questions pertaining to the proper use of the W-Test, T-Test and the Mann-Whitney Test.
    The TSC provided recommendations as to the appropriate use for each of the statistical test procedures for
    assessing site data. The PRP's have responded to comments on the Draft RI and RA report for SE  OU8.  The
    TSC  reviewed  these comments and participated in a conference call with the Region and PRP's. The TSC
    provided a statistical review of a proposal to use the UCL for risk assessment purposes. The TSC also provided
    guidance on how the 95% UCL of the mean should be calculated. The TSC responded to a number of

                                                 17

-------
statistical questions and provided the report titled "Computation of the Screening Levels for Letterkenny Army
Depot, Chambersburg, PA."  The following procedures and comments were provided to the Region:

•   Computation of an UCL for Screening Purposes dated July 21, 2000, and
•   A Much Simplified Procedure to Compute an UCL of Authentic Means dated July 26, 2000.

A number of conference calls with the Region were conducted to address questions pertaining to TSC
suggestions and recommendations.  The TSC received, and reviewed, a focused feasibility study and supporting
documentation pertaining to enhanced biodegradation. The report titled "Review of Letterkenny Army Deport
Southeastern Area Southeast Operable Unit Number 10 (On-Post Groundwater) Southeast Industrial Area Draft
Focused Feasibility Study" was provided to the Region. The Region participated in a conference call and
provided comments on the "Geospatial Averaging Approach Proposed for the Oil Burn Pit." The TSC
provided clarification to the Region on "electron donor" and the use of dyes and ionic tracers. During this
quarter the TSC reviewed a number of documents and provided the following two reports: "Comments on
Conceptual Work Plan for The Evaluation of Groundwater Data, Langley Air  Force Base Virginia" and
"Review of Comment Responses on the Geochemical Portion of the Conceptual Work Plan." The TSC
participated in a conference call pertaining to the EPC term for 1,1-dichloroethene and spatially averaged
UCL's. Following the review of TSC comments pertaining to OU-10 (dated June 19, 2001) by the Army, the
TSC was requested ti respond to the Army's comments. The TSC is currently reviewing the Army's response.

Project Name: Maryland
Site: Maryland Sand, Gravel and Stone S. F. Site
Site ID:

Type Lead:
Requested by: Debra Rossi (215) 814-3228
Lead Scientist: Kent Snyder (360) 546-0687

Start Date: March 2000
Expected Completion Date: September 2000
Revised Completion Date: July 2002

Estimated Budget: $ 19,000                                  Total Expenditures:$35,377
Revised Budget:$45,000                                     Total FY02 Expenditures:$205
Major Contaminants: Organics/Inorganics                     Total 2nd Qtr. Expenditures:$50

The RPM requested that the ESD-LV TSC provide assistance in determining if the site has been adequately
characterized. For example, Is the combination1 of soil sampling conducted for past operable units (OU1 and
OU2) and the combination of site characterization techniques for the current operable unit (OU3), e.g., surface
geophysical methods, soil gas surveys, soil boring programs, chemical analysis of surface and subsurface soils,
sufficient to conclude that: 1) portions of the so-called Eastern Excavation Area are uncontaminated (suitable
for unlimited use  and unrestricted access); 2) all so-called "principal threat" areas, or hot spots, have been
identified (and then- volumes appropriately estimated)

The site is located in Elkton, Cecil County, Maryland. The site consists of approximately 200 acres and is
bounded to the south by a telephone transmission line right-of-way, to the north and west by Marley Road, and
to the east by a property line approximately parallel to Ephrarta Lane. The site was previously operated as a
sand and gravel quarry. According to the Record of Decision (ROD) for OU2 at the site (i.e., the deeper water-
bearing units below the shallow, Upper Sand Unit), about three acres in the Eastern Excavated Area of the site
were reportedly used for the disposal of waste processing water, still bottoms,  sludge and drums of solid and
semi-solid waste between 1969 and 1974.
                                              18

-------
The TSC reviewed available site data and reports and provided comments on the following: "Soil
Investigation", "Supplemental Soil Delineation and Treatability", "Focused Feasibility Study", and "Cost
Estimates for the Revised Draft Feasibility Study." A number of conversations with the RPM pertaining to
TSC recommendations were completed.  Following a review of provided documents the TSC delivered the
report titled "Review of Maryland, Sand, Gravel and Stone Site Work Plan for Chemical Oxidation Technology
Study."  The TSC provided the Region comments and suggestions in a report titled "Review of Maryland
Sand,  Gravel and Stone Site Remediation Technology Screening Investigation-February 2001."  The TSC
received and reviewed a revised "Focused Feasibility Study", and provided comments to the Region. The TSC
received a "Remediation Technical Memorandum" for review. Following the review, the TSC provided the
report titled "Review Comments Maryland Sand, Gravel and Stone Site Remediation Technology Screening
Technical Memorandum June 14, 2001." The TSC responded to a number of questions from the RPM and
PRP's. Additional support is anticipated.

Project Name: White Oak
Site: Naval Surface Warfare Center - White Oak S. F.Site
Site ID:

Type Lead:
Requested by: Linda Watson (215) 814-3116
Lead Scientist: Anita Singh (702) 897-3234

Start Date: October 2001
Expected Completion Date: July 2002
Revised Completion Date:

Estimated Budget:$ 18,000                                   Total Expenditures:$7,820
Revised Budget:$                                           Total FY02 Expenditures:$7,820
Major Contaminants: Organics/Inorganics                      Total 2nd Qtr. Expenditures:$100

The Regional RPM requested that the ESD-LV TSC provide assistance in reviewing the statistical approach(s)
that was implemented to identify background levels in site matrices.  The site is located 5  miles north of
Washington, DC in Montgomery County, Maryland. This is a Base Realignment and Closure (BRAC) site and
was selected for closure.  The base is now closed and was scheduled for transfer on October 1997.

The Navy contractor, Brown & Root Environmental, developed a background sampling plan and the proposed
statistical analysis of background data that will be collected at the White Oak site.  The TSC will review the
proposed statistical approach submitted by the Navy and evaluate if the methodology used is a valid measure
for evaluation of background data at White Oak. Also, the TSC will comment on the appropriateness of the
number of samples proposed for each media, especially the limited number of samples proposed for sediment
and surface water media, and provide recommendations to improve the development of this background data
set.

Following a review of provided site documents and data the TSC provided the following report: "Review of the
Background Investigation Report Naval Surface Warfare Center" and "Statistical Comparison of Site 11  and
Background Groundwater Chromium Data NSWC White Oak,  Silver Spring, Maryland."  Additional support
is anticipated.

Project Name: Norfolk
Site: Norfolk Naval Shipyard S. F. Site
Site ID:

Type Lead:

                                             19

-------
    Requested by: Linda Watson (215) 814-3116
    Lead Scientist: Anita Singh (702) 897-3234

    Start Date: September 2001
    Expected Completion Date:April 2002
    Revised Completion Date:

    Estimated Budget:$l 8,000                                   Total Expenditures:$5,384
    Revised Budget:$                                           Total FY02 Expenditures:$5,384
    Major Contaminants: Organics/Inorganics                      Total 2nd Qtr. Expenditures:$73

    The Regional RPM requested that the ESD-LV TSC provide assistance in reviewing the statistical approach
    used by the PRP's to evaluate the background data set.

    Following a review of site documents and data the TSC provided the report titled "Review Comments on the
    Norfolk Naval Shipyard Statistical Approach for Evaluating Background Data." The TSC participated in a
    conference call with the Region pertaining to TSC comments and suggestions.

•   Project Name: Occidental
    Site: Occidental Chemical S. F. Site
    Site ID:

    Type Lead:
    Requested by: Maria Garcia (215) 814-3199
    Lead Scientist: Russell Plumb (702) 897-3265

    Start Date: June 2000
    Estimated Completion Date: December 2001
    Revised Completion Date: July 2002

    Estimated Budget: $12,000                                   Total Expenditures:$4,067
    Revised Budget:!                                           Total FYO1 Expenditures:$4,067
    Major Contaminants: Organics                                Total 2nd Qtr. Expenditures:$ 1,360

    The RPM requested that the ESD-LV TSC provide assistance in reviewing the Sampling and Analysis Plan and
    the QAPjP.

    Three consecutive owners disposed of industrial wastes at the Pottstown, PA 30-acre Occidental Chemical
    Corp/Firestone Tire  & Rubber Co. site.  The groundwater is contaminated with volatile organic compounds
    (VOCs) including PVCs from former site manufacturing  activities.  Possible health threats include drinking the
    contaminated groundwater.  Local agricultural lands depend on water from the Schuylkill River for irrigation;
    contaminated water use may therefore, threaten crops and livestock. Also, nearby wildlife and wetlands are
    threatened by the contamination from the site.

    The TSC reviewed the "Draft Sampling Plan - Revision 3 dated June 19, 2000. Following this review
    comments and suggestions were provided to the Region.  The TSC also reviewed the "Draft Sampling &
    Analysis Plan" and provided comments to the RPM in a July 7, 2000 letter report. The TSC participated in a
    number of conversations with the Region pertaining  to TSC comments and suggestions.

    In December of 2001 the Region requested the TSC  to perform the Max Test for organic/inorganic
    contaminants using the composite samples collected from four  lagoons. The TSC received site data and
                                                 20

-------
    conducted the requested test. The TSC provided the Region with the report titled "Data Packing Analysis -
    Surface Soil Samples Occidental Superfund Site."

•   Project Name: Sharon
    Site: Sharon Steel (Farrell Works) S. F. Site
    Site ID:

    Type Lead:
    Requested by: Rashi Mathur (215) 814-5234 Jennifer Hubbard (215) 814-3328
    Lead Scientist: Anita Singh (702) 897-3234

    Start Date: June 2000
    Expected Completion Date: September 2000
    Revised Completion Date: July  2002

    Estimated Budget: $20,000                                  Total Expenditures^ 128,059
    Revised Budget: $145,000                                   Total FY02 Expenditures:$2,081
    Major Contaminants: Organics                               Total 2nd Qtr. Expenditures:$ 1,483

    The RPM requested that the ESD-LV TSC provide assistance in providing a systematic and standardized
    approach for computing the UCL-concentration term for risk assessments.

    The Sharon Steel Corporation Farrell Works Disposal Area (the "site") is an area of about 400 acres located in
    Mercer County in Western Pennsylvania, within a few hundred feet of the Ohio/Pennsylvania border. The site
    is southwest of the former Sharon Steel Corporation Farrell Works, and is bordered on the east by the Shenango
    River. The  Sharon Steel Corporation used the area to dispose of blast furnace slag, electric arc furnace slag,
    basic oxygen furnace slag, and sludge beginning about 1900. From 1949 to 1981, millions of gallons of spent
    pickle liquor acid were dumped over the slag. It was thought that the acid would partially evaporate and then
    be neutralized by the carbonates in the slag.  In actuality, ground water contamination resulted.  The site is
    located in the flood plain of the Shenango River, and there are several wetland areas on site.

    This on-going effort involved the updating of the PROUCL program such as:

    •   including test of normal and lognormality
    •   Small samples - Shapiro Wilk's test/normal probability plot
    •   Large sample - Kolmogrov-Smirnov's test/normal probability plot, and
    •   for lognormally distributed data sets, include a 99% Chebychev inequality based upon minimum variance
    unbiased  estimates. This program plus the "User's Guide Program PROUCL", "Background and a Brief
    Description of the Program PROUCL", and the "Installation Guide Program PROUCL" were provided to the
    Region.

    The TSC  sent CD ROM's and copies of the documents to selected individuals for review. A number of
    reviewers comments were received by the TSC. The TSC addressed a number of questions by the reviewers
    and made the necessary changes. ProUCL Version 2.0 was finalized and is currently being peer reviewed.

REGION 4

•   Project Name: Distler
    Site:Distler  Brickyard S. F.  Site
    Site ID:

    Type Lead:

                                                  21

-------
Requested by: Femi Akindele (404) 562-8809
Lead Scientist: Lance Peterson (208)526-8718x170, Jennifer Martin (208) 526-8718x147 and Kent Sorenson
(208)526-8718x120

Start Date: April 1999
Expected Completion Date: December 1999
Revised Completion Date: October 2002

Estimated Budget: $25,000                                   Total Exps:$ 155,988       PC&B:$4,900
Revised Budget:$500,000                                    Total FY02 Exps:$39,388   PC&B:$ 1,300
Major Contaminants:  Organics/Heavy Metals                   Total 2nd Qtr. Exps:$25,043 PC&B:$800

The Regional Remedial Project Manager (RPM) requested that the Environmental Sciences Division (ESD-Las
Vegas (ESD-LV) Technology Support Center (TSC) provide assistance in reviewing the PRP's suggested
hydrogeological groundwater remediation approaches.

The 3-acre Distler Brickyard site in West Point, Kentucky is located on a 70-acre abandoned brick
manufacturing plant property that operated from the late 1800s until the mid-1970s.  In 1976 the property was
leased by Kentucky Liquid Recycling Inc., which began transporting waste to the brickyard property. Waste
disposal was contained at the site until 1979. There were approximately 2,300 drums on the site,  1,550 of
which contained various liquids, sludges, and solids. Spillage from the deteriorated drums killed grass, trees,
and birds on the site.  A contaminated groundwater plume is located beneath the site and could threaten the city
drinking water wells and the Ohio River.

Specific contaminants detected in groundwater and on-site soils include various volatile organic compounds
(VOCs) and heavy metals including lead from waste disposal activities. Potential health threats include direct
contact with, or accidental ingestion of, contaminated soils and groundwater.

The TSC received, and reviewed, three documents pertaining to groundwater remediation. Comments and
recommendations were provided to the RPM. The lead scientist participated in a technical meeting with the
RPM, USGS, and Kentucky State personnel in June. It was agreed at the meeting that additional field data are
required to fully evaluate potential biodegradation at the site. The TSC is to prepare the FSP, and the USGS
will lead the collection of additional field data. TSC will interpret the new field data and make a
recommendation for further remedial action at the site. Distler Brickyard support is expected to continue into
FY 2000 and may include a cooperative effort with USGS, EPA, State of Kentucky for design, construction and
operation of an "enhancement" to the  existing remedy. Several conferences calls were conducted with USGS
and the Region to iron out the details of a schedule for the sampling event. Sampling activities at the Distler
site to be conducted by the USGS are  scheduled for October 18-22 and will include 11 wells. Samples will be
sent to the EPA  Water Quality Laboratory in Athens, Georgia for analysis. Data analysis will be performed by
TSC staff.

The TSC and USGS completed the draft  "Field Sampling Plan for the Distler Brickyard".  TSC and USGS
prepared a status update on field activities for the RPM. The update discusses the sampling activities
conducted, problems encountered in the field, recommendations for improving site conditions, and a
preliminary schedule for completion of the final report. A conference call was held to finalize this report with
Femi Akindele.  The TSC completed and delivered the report titled "October 1999 Groundwater Sampling and
Data Analysis Distler's Brickyard, Hardin County, Kentucky".

The TSC provided the following documents to the Region: "Final Field Sampling Plan" and "Proposed
Activities for Fine Grained Alluvium (FGA) Sampling." Following the collection and analysis of site samples
and data the TSC provided the report titled "Summary of Groundwater and Soil Gas Collected June-August,
2000 Distler Brickyard Superfund Site, Kentucky." A meeting with the RPM occurred on October  11, 2000 at

                                              22

-------
    the Regional Office and at this meeting presented the results obtained from groundwater and soil gas sampling
    activities conducted at the site June-August 2000. Possible final remedial response actions were presented to
    EPA, however, a final decision for the site was deferred pending completion of the final report.

    The report titled "June-August 2000 Groundwater and Soil Gas Data Analysis, Distler Brickyard Site,
    Hardin County, Kentucky" was completed on November 30, 2000. This report recommended the investigation
    of an innovative enhanced bio-remediation technology for remediation of remaining chloroethene
    contamination at the site.  Conference calls were conducted in January and March 2001 with USGS, EPA, and
    the State of Kentucky to discuss TSC recommendations.  A proposal to use polymeric organic materials to
    enhance anaerobic reductive dechlorination at the site was written and submitted to the N.S.F. for
    consideration. Following the review the N.S.F. accepted and agreed to fund the proposal for S500K. A number
    of site and regional office visits were completed to plan, and initiate, the field work. Sampling was conducted
    at the site with the USGS providing equipment and lab space. Following an assessment of the sampling data
    the report titled "Summary of the Results of the Phase I Pilot-Scale Field Test of a Chitin-Fracing Technology
    Conducted at the Distler Brickyard Site, Hardin County, KY" was provided to the Region.

•   Project Name: Distler
    Site: Distler Farm S. F. Site
    Site ID:

    Type Lead:
    Requested by: Femi Akindele (404) 562-8809
    Lead Scientist: Lance Peterson (208) 528-8718x170, Jennifer Martin (208) 528-8718 x!47

    Start Date: March 2001
    Expected Completion Date: August 2001
    Revised Completion Date: February 2002

    Estimated Budget: $ 18,000                                   Total Exps:$ 11,785
    Revised Budget: $                                          Total FY02 Exps:$8,069
    Major Contaminants: Volatiles - TCE and PCE                 Total 2nd Qtr. Exps:$2,569

    The RPM requested that the ESD-LV provide assistance in identifying and  implementing appropriate remedial
    measures to remove groundwater contaminants.  This effort will involve evaluating sire data and
    recommending an improved remedial strategy.

    The 9-acre Distler Farm site in Louisville, Kentucky was discovered in 1977 when the EPA launched a search
    for sites  previously used to store industrial wastes.  In 1978, flood waters scattered drums of industrial waste
    stored at the site along the flood plain of Stump Gap Creek. In an emergency cleanup action, the EPA
    recovered and repacked 832 drums containing chemicals characteristic of the paint and varnish industry and
    then moved them to higher ground.  The primary contaminants of concern affecting groundwater and soils are
    VOCs including TCE and PCE, metals and inorganics. The TSC is currently reviewing site documents and
    data. A  "Draft Outline for the "Data Summary Report for the Distler Farm  Site, Jefferson County, Kentucky"
    was prepared to better present the TSC review comments and suggestions. Review of site documents and data
    is in process.

•   Project Name: Duracell Battery
    Site: Duracell Battery Tech S. F.Site
    Site ID:

    Type Lead:


                                                 23

-------
Requested by: Ken Mallory (404) 562-8802
Lead Scientist: Jennifer Martin (208) 528-8718 x!47

Start Date: September 2001
Expected Completion Date: August 2002
Revised Completion Date:

Estimated Budget:$20,000                                   Total Exps:$4,627
Revised Budget:$                                           Total FY02 Exps:$4,627
Major Contaminants: Organics/Inorganics                     Total 2nd Qtr. Exps:$l,327

The Regional RPM requested that the ESD-LV TSC provide assistance in reviewing the proposed PRP's
solvent remediation methods and techniques for site soil and groundwater.

The Duracell Battery Tech Site is located in Lexington, Davidson County, North Carolina. The site
encompasses approximately 26.5 acres in a light industrial/commercial area of Lexington. Davidson County is
situated in the west-central part of North Carolina. The county is a plateau, dissected by numerous streams,
which have cut deep, narrow valleys. The site is located in the Abbotts Creek drainage basin of eastern
Lexington.  The Abbotts Creek watershed encompasses approximately one-third of Davidson County and
empties into the Yadkin River at High Rock Lake.

Following a review of site documents and data, the TSC provided the report titled "Comments on the Remedial
Investigation Report Operable Unit 2 Duracell U. S. A. Site, Lexington, North Carolina, April 2001." A
number of conference calls  occurred between the TSC and the RPM. A site visit was tentatively planned for
May 2002.

Project Name: Estech
Site: Estech General Chemicals S. F. Site
Site ID:

Type Lead:
Requested by: Ken Mallary (404) 562-8802
Lead Scientist: Jennifer Martin (208) 528-8717 x!47, Lance Peterson (208) 528-8718 x!70

Start Date: January 2002
Expected Completion Date: September 2002
Revised Completion Date:

Estimated Budget:$ 19,000                                   Total Expenses:$200
Revised Budgets                                           Total FY02 Expenses:$200
Major Contaminants: Lead and Arsenic                       Total 2nd Qtr. Expenses:$200

The Regional RPM requested that the ESD-LV TSC provide assistance in evaluating an Engineering
Evaluation/Cost Analysis (EE/CA).

The Estech General Chemicals Site is located on the Cape Fear River in Wilmington, N.C. This site was used to
manufacture phosphate fertilizer and is contaminated with lead and arsenic.

An EE/CA will be completed following negotiations with the PRP's. When complete this EE/CA will be sent
to the TSC for review.
                                             24

-------
•   Project Name: Mallory
    Site: Mallory Capacitor S. F. Site
    Site ID:

    Type Lead:
    Requested by: Lofton Carr (404) 562-8804
    Lead Scientist: Jennifer Martin (208) 528-8718 x!47

    Start Date: December 2001
    Expected Completion Date: July 2002
    Revised Completion Date:

    Estimated Budget:$ 18,000                                   Total Exps:$4,852
    Revised Budget:$                                           Total FY02 Exps:$4,852
    Major Contaminants: PCB's/TCE                             Total 2nd Qtr. Exps:$4,852

    The Regional RPM requested that the ESD-LV TSC provide assistance in reviewing the efforts pf the
    groundwater recovery system and to investigate other approaches for enhancing the recovery of PCS's and
    TCE in groundwater.

    Electrical capacitors were manufactured on the 8 1A acre Mallory Capacitor site, located in Waynesboro, TN,
    from 1969 to 1984. The operators first used polychlorinated biphenyls (PCBs) as the dielectric fluids in the
    capacitors, switching to a plastics chemical in 1978. The factory changed hands when Dart Industries
    purchased it in 1978. Dart later sold the property in 1980 to Emhart Industries, Inc. As part of the sales
    agreement with Emhart, certain PCB wastes, a buried tank, and contaminated soil were removed from the site
    and sent to an approved PCB disposal facility. The plant continued to operate, but voluntarily closed in 1984
    when PCBs were discovered throughout the site.

    A conference call with Loften Carr provided an introduction to the site. A description of the remedial activities
    that have been conducted to date, and identified some areas in which he requires support. At the end of the call,
    Loften requested TSC participation in a call with the site contractors, Conestoga River and Associates (CRA).
    A call was held with CRA personnel in which additional site information was provided, and CRA also
    identified some key documents that will be reviewed. The TSC received some additional site documents for
    review.

•   Project Name: Northeast
    Site: Northeast Chemical S F. Site
    Site ID:

    Type Lead:
    Requested by: Ken Mallary (404) 562-8802
    Lead  Scientist: Jennifer Martin (208)  528-8717 x!47, Lance Peterson (208) 528-8718 x!70

    Start Date: January 2002
    Expected Completion Date: September 2002
    Revised Completion Date:

    Estimated Budget:$ 18,000                                   Total Expenses:$ 100
    Revised Budget:$                                           Total FY02 Expenses:$100
    Major Contaminants: Lead, Arsenic                           Total 2nd Qtr. Expenses:$100
                                                 25

-------
The Regional RPM requested that the ESD-LV TSC provide assistance in provide assistance in evaluating an
Engineering Evaluation/Cost Analysis (EE/CA). Northeast Chemical is located next to the Cape Fear River
located in Wilmington, N.C. This site manufactured "super phosphate" fertilizer for many years using the lead
acid chamber process.  The main contaminants at the site are inorganics, mainly lead and arsenic, in all media,
as well as low pH. The Region documented a plume of low pH groundwater and suspected shallow
groundwater is discharging directly into the Northeast Cape Fear River, mobilizing the contaminants. One
challenge for the EE/CA will be to characterize the low pH groundwater and develop possible alternatives to
address it.

The TSC has  not received any site documents at this time.

Project Name: Roanoke River
Site: Roanoke River Study S.  F. Site
Site ID:

Type Lead:
Requested by: Beth Walden (404) 562-8814
Lead Scientist: John Zimmerman (702) 897-3379 Russell Plumb (702) 897-3265

Start Date: February 2001
Expected Completion Date: December 2001
Revised Completion Date: August 2002

Estimated Budget:$15,000                                 Total Exps:$60,340      PC&B:$4,300
Revised Budget=$80,000                                    Ttl FY02 Exps:$16,088   PC&B:$2,500
Major Contaminants: Organics                            Ttl 2nd Qtr Exps:$9,937  PC&B:$1,000

Project Name: Roanoke                                     Total Exps:$33,875       PC&B:$3,170
Site: Weyerhaeuser OU2                                   Ttl FY02 Exps:$ 13,997    PC&B:$2,000
Site ID:                                                    Ttl 2nd Qtr. Exps:$9,937   PC&B:$ 1,000

Project Name: Roanoke                                     Total Exps:$26,465       PC&B:$ 1,130
Site: Georgia Pacific                                       Total FY02 Exps:$2,091   PC&B:$500
Site ID:                                                    Total 2nd Qtr. Exps:$0     PC&B:$0

The RPM requested that the ESD-LV TSC provide assistance in reviewing site analytical data and provide the
following:

•  Identify tentatively unidentified compounds TIC's
•  Determine and/or identify  detection limits for Phenols and PAH's and
•  Perform dioxin fingerprint analysis.

The Georgia-Pacific Hardwood Sawmill site is defined as the 24-acre area located on Plywood Drive within the
city limits of Plymouth, North Carolina. Contaminants consisting primarily of dioxins/furans, polynuclear
aromatic hydrocarbons, pentachlorophenol, pesticides, polychlorinated biphenyls, and  a few heavy metals
released into the environment  during past sawmill wood treating operations. Having been placed on the
National Priorities List in 1999, a remedial investigation and feasibility study of the Georgia-Pacific site is
required. Analysis of soil and water samples collected indicate extensive contamination by dioxin/furans,
polynuclear aromatic hydrocarbons, polychlorinated biphenyls, and inorganics, arsenic, lead and zinc.  After
reviewing site data, the TSC provided the Region with the following reports: "Fingerprinting Dioxin-Furan
                                             26

-------
    Compounds in the Lower Roanoke River," and "Dioxin Furan Fingerprinting Analysis in the Lower Roanoke
    River Basin."

    After reviewing additional data and site documents the TSC provided the following reports to the Region:
    "Supplemental Analysis of Roanoke River Dioxin Data", "Roanoke River - Evaluation and Identification of
    Tentatively Identified Compounds and Unknowns" and "Dioxin-Furans Fingerprinting-Summary Report." The
    TSC participated in a meeting with the RPM and PRP's at the Regional Office, and reviewed and assessed
    additional data and provided the following: "Tentatively Identified Compound Assessment", "Comments on
    Dioxin Analysis of White Catfish Samples", and "High Volume Sampling Approach" for the Roanoke River
    Site. A number of letter reports dealing with "TIC" analysis was provided to the Region. Additional
    fingerprinting of dioxin - furans were completed.  The report titled "Dioxin-Furan's Fingerprinting of POTW
    Monitoring Data from the Lower Roanoke Basin was provided to the Region." A site visit was tentatively
    planned for May 2002.

•   Project Name: Shuron
    Site: Shuron Inc. S. F. Site
    Site ID:

    Type Lead:
    Requested by: Ralph Howard (404) 562-8829
    Lead Scientist: L. Peterson (208) 528-8718x170, H. Bullock (208)  526-1278, J. Martin (208) 528-8718x147

    Start Date: March 2000
    Expected Completion Date: April 2000
    Revised Completion Date: July 2002

    Estimated Budget:$ 18,000                                    Total Expenditures^ 14,653
    Revised Budget:$28,000                                      Total FY02 Expenditures:$800
    Major Contaminants: Organics                                Total 2nd Qtr. Expenditures:$200

    The RPM requested that the ESD-LV TSC provide assistance by providing an oversight of the remedial
    design/remedial action activities that are being planned for the site. The following three tasks were identified
    by the RPM in which the TSC would participate:

    1. Review of the initial groundwater data and the groundwater monitoring plan.

    2. Review of the PRPs's proposal for MNA and

    3. Review groundwater data reports.

    The Shuron Inc. Superfund Site is located in Bamwell County, South Carolina. The site property consists of 85
    acres, and slopes slightly from north to the southeast. The main building, from which lens manufacturing
    operations were conducted, is situated on a 34-acre portion of the site property. Approximately fifty-one
    additional acres, designated primarily as wetlands, lie to the east and southeast of the main building. The site
    was used by Textron, Inc. (from 1960 until 1985) and Shuron, Inc.  (1995 until 1991) as an ocular lens
    manufacturing facility.

    Wastewater generated from manufacturing processes conducted on the site contained volatile organic
    compounds (VOCs), semivolatile organic compounds (SVOCs) and metals.  Wastewater was discharged from
    the main building to the wastewater settling lagoons, which lie east of the building.  Wastewater from the
                                                 27

-------
settling lagoons was discharged to the northern drainage ditch, which drained to the wetland, east of the main
building. Sediment from the lagoons was transferred to the solids ponds located south of the settling lagoons.

At the request of the RPM, two TSC scientists met at the site in April 2000. The TSC reviewed the RI report,
the ROD, and the baseline groundwater report and provided comments in the letter report titled "Review of the
Groundwater Sampling Plan for the Shuron Superfund Site, Barnwell, South Carolina." The TSC received, and
reviewed, the document titled "Arsenic Source Characterization Plan Southern Wetlands Remediation Area,
Shuron S. F. Site." Recommendations to support the implementation of monitoring natural attenuation at the
Shuron site was provided to the Region. The TSC participated on a conference call pertaining to the arsenic
contamination. It is anticipated that the TSC will be involved with the negotiations between the Region and the
PRP's consultants. Following a review of "Appendix B Work Plan" the report titled "Comments on the
Groundwater Evaluation Work Plan Appendix B Conceptual Sump and Monitoring Well Plan (dated
 January 14,2002), Shuron Site, Barnwell, S.C. was delivered to the  Region.

Project Name: Tower
Site: Tower Chemical Company S. F. Site
Site ID:

Type Lead:
Requested by: Galo Jackson (404) 562-8937
Lead Scientist: John Zimmerman  (702) 897-3379, Andy Grange (702) 798-2137, W. Sovocool (702) 798-2212

Start Date: March 2001
Expected Completion Date: August 2001
Revised Completion Date: August 2002
Estimated Budget: $12,000
Revised Budget: $
Major Contaminants: Volatiles/Semi-Volatiles
Total Exp:$8,671
Total FY02 Exps:$200
Total 2nd Qtr. Exps:$100
PC&B:$7,400
PC&B:$6,000
PC&B:$1,500
The RPM requested that the ESD-LV provide assistance in identifying and determining the concentration of
unknown volatile and semi-volatile compounds (TICs) in ground water samples.

The 30-acre Tower Chemical Company site located in Clermont, Florida is an abandoned chemical
manufacturing facility.  During its operation,  TCC owned and used two separate parcels of land; a main facility
and an irrigation field.  From 1957 to 1981, TCC manufactured, produced, and stored various pesticides. TCC
discharged acidic waste waters produced in the main facility into a Vi-acre, unlined percolation/evaporation
pond where contaminants were solidified.  TCC burned and buried the waste on a 1 Vi- acre plot located at the
main facility. In 1980,  the waste water pond  at the main facility overflowed into an adjacent swamp and
entered an unnamed stream north of the site.

After reviewing the provided data, the TSC provided the Region with the report titled "Tower Chemical
Evaluation and Identification of Tentatively Identified Compounds and Unknowns." Because of problems
identifying some of the TIC's the Regional laboratory provided a number of sample extracts to ESD for
analysis. Andy Grange and Wayne Sovocool are providing analytical support. The following were provided to
the Region: "Special Study of three (3) Existing Files from Region 4" and "Elemental Compositions of the
Apparent Molecular Ions from the Major Components hi Four extracts from Two Wells at the Tower Chemical
Site.:
                                             28

-------
REGION 5

•   Project Name: Pristine
    Site: Pristine Inc., S. F. Site
    Site ID:

    Type Lead:
    Requested by: Richard Boice (312) 886-4740
    Lead Scientist: Paul Ritter (208) 526-6686

    Start Date: January 2002
    Expected Completion Date:August 2002
    Revised Completion Date:

    Estimated Budget:$8,000                                     Total Expenses:$324
    Revised Budget:$                                           Total FY02 Expenses:$324
    Major Contaminants: VOC's                                 Total 2nd Qtr. Expenses:$324

    The Regional RPM requested that the ESD-LV TSC provide assistance in evaluating the use of Tedlar bags for
    soil, and gas samples.

    Pristine, Inc., located in Reading, Ohio began operating a liquid waste disposal facility at the location of a
    former sulfuric acid manufacturing plant on this 2-acre site in 1974. In  1977, the company obtained a permit
    permitting operation of a liquid waste incinerator. From 1974 to 1981, a variety of acids, organic solvents, and
    waste products were received at the facility and subsequently were treated by incinerator or acid neutralization
    and disposed of at the site. In 1979, an inspection revealed the presence of 8,000 to 10,000 drums and 13 bulk
    storage tanks containing a wide variety of hazardous substances. In 1981 the facility closed as a result of a
    State enforcement action.

    The TSC provided the Region with the currently approved EPA method (SW-846, Method 0040) and also
    provided some suggestions pertaining to the use of Tedlar bags.

•   Project Name: Sheridan
    Site: U.S. Army Fort Sheridan Landfills S. F.  Site
    Site ID:

    Type Lead:
    Requested by: Owen Thompson (312) 886-4843
 .   Lead Scientist: Jeff Sondrup (208) 526-8396,  Marilyn Case (208) 526-7006

    Start Date: July 2001
    Expected Completion Date: April 2002
    Revised Completion Date: August 2002

    Estimated Budget:$ 12,000                                    Total Expenditures:$13,422
    Revised  Budget:$20,000                                     FY02 Expenditures.$8,143
    Major Contaminants: Organics                                Total 2nd Qtr. Expenditures:$706

    The Regional RPM requested that the ESD-LV TSC provide assistance in evaluating the "landfills" gas
    collection/treatment system and the stability of the cover.
                                                  29

-------
    Fort Sheridan is a Base Closure site formerly owned by the Army located approximately 30 miles north of
    Chicago on Lake Michigan. The site has subsequently been completely transferred to private ownership, or
    realigned to other military services. Landfills 6 and 7, also known as the Wells Ravine Landfill, is a former
    ravine used as the base landfill in the 50's thru the 70's.  The primary risk-driver at the landfill is vinyl chloride
    emissions and their impact on adjacent (as close as 50 feet) military housing.

    The TSC reviewed the preliminary draft (60%)  interim remedial design for Fort Sheridan Landfills 6 and 7.
    Comments and suggestions were provided to the RPM's in a letter report dated August 31, 2001. Following a
    review of an air monitoring and modeling report, the TSC provided the Region with Comments and
    Recommendations in the report titled "Draft Air Monitoring and Report Phase 1 Interim Remedial Action
    Landfills 6 & 7 Fort Sheridan, Illinois."  Following a review of additional site documents the report titled "90%
    Design Submittal Interim Remedial Design Fort Sheridan Landfills 6 & 7" was provided to the RPM.

REGION 6

•   Project Name: ASARCO
    Site: ASARCO Smelter (El Paso, Texas) S. F. Site
    Site ID:

    Type Lead:
    Requested by: Lon Biasco (214) 665-6673  John Rinehart (214) 665-6789 Susan Webster (214) 665-6784
    Lead Scientist: Anita Singh (702) 897-3234

    Start Date: June 2001
    Expected Completion Date: November 2001
    Revised Completion Date: July 2002

    Estimated Budget: $ 18,000                                  Total Expenditures:$31,401
    Revised Budget:$40,000                                     Total FY02 Expenditures:$4,709
    Major Contaminants: Lead/ Arsenic                           Total 2nd Qtr. Expenditures:$0

    The RPM requested that the ESD-TSC provide assistance in identifying the geographical extent of lead and
    arsenic on, and in the vicinity of, the ASARCO  Smelter.

    Region VI completed a confirmation sampling effort at the ASARCO smelter site in El Paso, Texas.  The
    sampling effort was conducted to confirm the results of an independent study conducted by the University of
    Texas El Paso (UTEP). A total of 100 sample locations were selected with samples collected from the surface
    (0 to 2 cm) and (0 to 6in).  The samples were not collected on a grid but rather on public access areas scattered
    in a 3 mile radius of the site.

    The TSC completed a geostatistical analysis on  this data and the UTEP data and provided the Region with the
    report titled "Kriging Analysis on ASARCO Data." The Region collected more samples in the El Paso area
    during the month of July.  After analysis the data was provided to the TSC for kriging.  Variogram models and
    the kriging results were provided to the Region. Overlays on a base map included kriged results for all data,
    individual sampling events, kriged  results, sampling locations, and a grid for additional sampling was provided
    to the Region. Utilizing the information provided by the TSC the Region completed the on-site sampling effort.
    Following the validation of the analytical data the TSC will provide geostatistical analysis.

•   Project Name: Sol Lynn
    Site: Sol Lynn/Industrial Transformers S. F. Site
    Site ID:


                                                 30

-------
Type Lead:
Requested by: Ernest Franke (214) 665-8521
Lead Scientist: Lance Peterson (208)528-8718x170,  R. Arnett (208) 526-8005, B. Starr (208) 526-0174

Start Date: October 1999
Expected Completion Date: July 2000
Revised Completion Date: July 2002

Estimated Budget:$38,000                                    Total Exps:$58,534      PC&B:$4,000
Revised Budget:$75,000                                     Total FY02 Exps:$319     PC&B:$600
Major Contaminants: Organics                                Total 2nd Qtr. Exps:$100  PC&B:$100

The RPM requested that the BSD, TSC provide assistance in reviewing site documents and possible modeling
subsurface contaminants.

The area around this 0.75-acre site, located in Houston, Texas, is a mix of residential, commercial, and light
industrial facilities. Approximately 2,000 residents and 100,000 other people move within a one-mile radius of
the site on a daily basis due to recreational activities associated with the area. The site operated as an electrical
transformer salvage and recycling company between 1971 and 1978, and as a chemical recycling and supply
company from 1979 through 1980. The first documented investigation of this site took place during the fall of
1971 when the City of Houston Water Pollution Control Division noted that the workers at Industrial
Transformers poured oil out of electrical transformers onto the ground during transformer dismantling.

A technical assessment of the site, commencing in January 1986, indicated the presence of PCB contamination
has been confined to the top two feet of soil. The highest concentrations of PCBs were found in the middle of
the site. TCE has migrated deeper than the PCBs and away from the site. Residual TCE remaining in the
surface soil will be remediated along with the PCB contaminated soils.

The TSC reviewed a number of documents and provided initial comments and recommendations to the RPM.
TSC personnel met with the RPM, and the State of Texas staff in Houston, TX for a site visit and a more
definitive discussion as to what assistance the TSC will provide. Following the site visit, the TSC provided a
list of technologies that may be useful at the Sol Lynn site and provided information about dissolved oxygen
(DO) measurements. The TSC reviewed and provided comments on the amended work plan in particular to the
fate and transport modeling issues. The TSC reviewed and provided comments and suggestions pertaining to
the "Supplemental RI/FS Study" and provided information on the required groundwater modeling parameters.
In addition, the TSC received, and reviewed, the "Field Sampling and the Data Management Plans." The TSC
is currently doing  the sub-surface modeling for the Region. Additional data (i.e., well survey and water level
data) was received by the TSC and was used to update the preliminary groundwater flow model. The TSC
received reviewed and provided comments pertaining to the amended work. The TSC consulted with the site
contractor, Terra Tech, concerning the relocation of a well that could not be located as previously agreed due to
interference with an existing powerline. Effort was devoted to examining the transport codes to be used in the
planned modeling to increase their computational effort through parallelization.  The TSC received a
preliminary field data set which included an updated  base map of the monitoring well network, well completion
locations, data summary, boring logs and flow rate charts.

Project Name: South Cavalcade
Site: South Cavalcade S. F. Site
Site ID:

Type Lead:
Requested by: Camille Hueni  (214) 665-2231

                                             31

-------
Lead Scientist: Robert Starr (208) 526-0174, John Keck (208) 526-5458

Start Date: March 2000
Expected Completion Date: August 2000
Revised Completion Date: May 2002
Estimated Budget: $10,000                                   Total Expenditures:$l 1,207
Revised Budget:$ 15,000                                     Total FY02 Expenditures:$900
Major Contaminants: Organics                                Total 2nd Qtr. Expenditures:$200

The RPM requested that the ESD-LV TSC provide assistance in reviewing a natural attenuation report.

This 66-acre site located in Houston, Texas is a mixture of residential, commercial, and industrial properties.
The site was used as a wood preserving and coal tar distillation facility from 1910 to 1962. The wood
preserving facility consisted of an operation area, a drip track, and treated and untreated wood storage areas.
The operation area included wood-treating cylinders, chemical storage tanks, and a waste water lagoon.
Creosote and metallic salts were used in the operation.

The primary contaminants of concern affecting the groundwater, soil and sediment are VOCs including
benzene, toluene, and xylene, other organics including PAHs; and metals including arsenic, chromium and lead.

The TSC received, and reviewed, the report "Verification of Groundwater Fate and Transport Evaluation" dated
July 2000. The TSC also reviewed comments by Roger Lee on the "verification" report. In November the TSC
provided the Region with  a report titled "Review of Verification of Groundwater Fate and Transport
Evaluation-South Cavalcade Superfund Site, Houston, Texas."  In summary, source control or removal is
usually a prerequisite for selection of MNA. Creosote present as a DNAPL at this site would be expected to
persist for decades or longer. Therefore, the plans for removal or long term management of this material are an
important part of a remedy, but  are not addressed in this document. The TSC participated in a number of
conference calls with the Region pertaining to TSC comments and recommendations. Additional support is
anticipated.

Project Name: Texarkana
Site: Texarkana Wood Preserving S. F. Site
Site ID:

Type-Lead:
Requested by: Dave Abshire (214) 665-7188 Faye Duke (512) 239-2443
Lead Scientist: Ron Arnett (206) 526-8005

Start Date: July 1996
Expected Completion Date: June 2002
Revised Completion Date: July 2002

Estimated Budget: $18,000                                   Total Expenditures:$2.290
Revised Budget:                                            Total FY02 Expenditures:673$
Major Contaminants: Organics                                Total 2nd Qtr. Exps:$400

The Region V RPM requested that the TSC provide assistance in statistical and modeling issues related to
characterizing site contaminants.
                                              32

-------
    The 25-acre Texarkana Wood Preserving Company site, located in Bowie, Texas is an abandoned wood-
    treating facility that operated under various owners from 1909 to 1984. When the site was placed on the NPL
    in 1985, approximately 793,000 gallons of hazardous waste were stored in pressure vessels, steel tanks,
    retention ponds, surge tanks, and three evaporation ponds. All units were heavily contaminated with creosote
    and pentachlorophenol (PCP) used in the treatment process, as well as several by-products. Past efforts by the
    TSC included evaluation of previously collected data. The TSC utilized Geostatistics for assisting the Region
    in identifying the geographical distribution of site contaminants. The TSC evaluated monitoring data and
    attended meetings at Texarkana. The TSC participated hi numerous conference calls with the RPM and  has
    provided soil contamination maps of site contaminants.  The TSC was also involved with modeling  the
    groundwater plume. A meeting with the RPM, State of Texas personnel and TSC staff at ESD-LV to discuss
    monitoring design approached was completed.

    Due to a change in the remedy the Region has requested additional assistance in updating the modeling effort
    that the TSC provided in 1999. The 1999 provided product was "Groundwater Fate and Transport Modeling
    for Texarkana Wood Preserving Company S.F. Site." The TSC is currently reviewing additional groundwater
    data.

REGION  7

•   Project Name: Asarco
    Site: Asarco Omaha Facility S. F. Site
    Site ID:

    Type Lead:
    Requested by: Don Bahnke (913) 551-7747
    Lead Scientist: Mike Abbott (208) 526-8596, A. K. Singh (702)  895-0364, Bill Cole (702) 897-3255

    Start Date: September 1998
    Expected Completion Date: February 1999
    Revised Completion Date: July 2002

    Estimated Budget: $ 18,000                                   Total Expenditures:$67, 484
    Revised Budget:$80,000                                     Total FY02 Expenditures^ 12.218
    Major Contaminants: Lead                                   Total 2nd Qtr. Expenditures:$2,352

    The RPM requested that the ESD-LV TSC provide assistance in modeling ground deposition rates relative to
    air contaminant concentrations.

    The Asarco Omaha facility refined lead bullion and lead drosses. Refinement was achieved using traditional
    pyro-metallurgical processes including addition of metallic and non-metallic compounds to molten lead to
    remove impurities. The Omaha plant produces refined lead and speciality metal by-products including
    antimony-rich lead, bismuth, dore' (silver-rich material) and antimony oxide. Although fundamentally
    classified as a primary lead refinery (not lead smelter), the Omaha plant is the  only facility in the United States,
    and one of only a few such facilities in the world, designed to process lead bullion containing recoverable
    amounts of several different metals. As a result, the facility employs a complex array of both traditional and
    unique pyrometallurgical processes which are carried out as batch operations.  This facility was constructed in
    the early 1870s and is currently closed.

    The TSC review of site and metallurgical data deposition was completed.  Following this review an  initial
    model was completed.  This model included plots of relative annual wet and dry deposition rates from the 180'
    "Black Stack" covering the periods 1984 through 1990.  Deposition modeling runs have been completed for the


                                                  33

-------
180' stack. A 310' stack is soon to be evaluated.  Once all the modeling is completed, a report will be written
and provided to the Region.  The final report "Dispersion Modeling of Atmospheric Deposition Patters Around
the Asarco Omaha Lead Refinery" was completed and sent to the RPM. This report details the methods and
results of lead fallout modeling for both the 180-ft. Black Stack and an old 310-ft. Stack. There was some
follow-up work completed comparing the modeling results with a map of actual soil concentrations. Comments
pertaining to the comparison of soil concentration with the modeling results were provided to the RPM. The
TSC was requested to provide geostatistical support by kriging soil lead concentrations on and in the vicinity of
the smelter.  The TSC completed the kriging and provided maps and associated overlays. In addition,  the TSC
provided recommendations for additional sampling locations that would improve the kriged results. Based on
these maps the RPM requested assistance in identifying specific sampling locations. The TSC provided the
Region an "all properties kriged map identifying six locations where additional samples should be collected."
The TSC provided the Region with a table identifying properties on and near the site that exceeded 400 mg/kg
of soil lead at one mile increments. Also provided were figures and tables delineating the percentage of
properties exceeding 400 mg/kg of lead on 4 cardinal directions in  1-mile increments.  The TSC received
additional data completed geostatistical analysis and provided the Region with kriged maps and overlay of soil
lead concentration. The TSC evaluated arsenic soil data for possible kriging. The TSC provided some
additional base maps showing more streets as requested by the RPM.

Project Name: Big River
Site: Big River Mine Tailing S. F. Site
Site ID:

Type Lead:
Requested by: Bruce Morrison (913) 551-7755
Lead Scientist: Mike Abbott (208) 526-8596

Start Date: April 1997
Expected Completion Date: October 1997
Revised Completion Date: August 2002

Estimated Budget: $30,000                                   Total Expenditures^ 111,377
Revised Budget:$ 125,000                                    Total FY02 Expenditures:$10,517
Major Contaminants: Inorganics                              Total 2nd Qtr. Expenditures: $5,650

The Big River Mine Tailings site in Desolge, St. Francois County, Missouri, was used for disposal of lead mine
tailings during 1929-58. The site, a fomer mining region, is about 70 miles south of St. Louis and is often
referred to as the "Old Lead Belt". The region (approximately 110 square miles) contains numerous tailings
ponds and piles.

St. Joe Minerals Corporation operated the site. There is disposed lead, cadmium, and zinc rich mine tailings
over approximately 600 acres in rural areas bordered on three sides by Big River. In 1972, the company
donated 502 acres of the land to St. Francois County,  which then leased the land to St. Francois County
Environmental Corp. (SFCEC).  Since 1973, SFCEC has operated a sanitary landfill on approximately 60 acres
of the southern section of the tailings pile.

EPA learned of the site in 1977, when an estimated 50,000 cubic yards of tailings slumped into the Big River
during a heavy rain storm. After the collapse, the Missouri Department of Conservation detected elevated lead
levels in bottom-feeding fish and advised local residents.

The RPM requested the TSC to evaluate and identify air deposition of lead-containing particulates in the
vicinity of mine waste piles. The deposition of particulates were modeled to determine if additional sampling is


                                              34

-------
    required to characterize lead contamination. In addition, samples from this site will be analyzed to determine
    the amount of total and bioavailable lead for risk assessment purposes.

    Source emission modeling was completed for 34 chat pile and tailings flat sources utilizing over six years of
    hourly wind data. These emission rates accounted for source-specific particle size, surface roughness, pile
    height, and lead concentration. Air dispersion modeling using the Fugitive Dust Model has been completed for
    all sources over a coarse receptor grid of the entire 225 km 2 region.  All deposition modeling has been
    completed and the report "Air Dispersion Modeling of Mine Waste in the Southeast Missouri Old Lead Belt"
    was given to the Region.  The report was reviewed by the Region and the Agency for Toxic Substances and
    Disease Registry. The report was finalized and developed into an external report and a journal manuscript.  The
    final publications will include a comparison of the modeling results with surface soil sampling data recently
    obtained. Initial examination of these sampling results indicate very good agreement with model predictions.
    Finalization of the modeling report was completed, after receiving review comments from the RPM. Review
    comments were received. The report was finalized.  The RPM requested that the TSC provide assistance as
    needed to the PRP sub-contractor (TRC, Inc.) in using modeling results for the PRP's current site  assessment.
    This benefits EPA by promoting consistency and coordination between the PRP and EPA's site assessment
    methods and assumptions. On September 29th, Gayle Hoffhagle of TRC Inc., was sent a zipped file containing
    the six 1-year St. Louis FDM met files that were used in the Big River site modeling and an Excel file
    containing Desloge air monitoring (lead only) data that was built from hard copies of Shell monitoring reports.
    The TSC Task Lead and the TRC Inc. personnel have had a number of discussions pertaining to a number of
    modeling issues.

    The TSC received a request to review a Deposition Sampling Protocol developed by the PRP subcontractor,
    TRC.  That protocol proposed that downwind deposition of wind suspended lead be measured using oil-coated
    filters in samplers located downwind of two tailing sites. The TSC completed the review of the deposition
    sampling protocol and provided comments to the Region.  In December the TSC was requested to review a
    new air sampling plan submitted by TRC. The plan was reviewed with comments and suggestions provided to
    the Region.  The TSC completed some lead/soil analysis and provided the Region with the report titled "Big
    River Superfund Site In Vitro  Soil Extraction." The TSC completed some data assessment analysis pertaining
    to the distribution of lead from the source. The RPM sent the TSC an additional sample for bioavailable lead
    analysis.  The sample was analyzed and the analytical results were provided to the RPM. The RPM requested
    that the percent (%) of bio available lead be calculated.  Following an assessment of the data of was determined
    that the % could not be calculated because the sample particle size was to large.

•   Project Name: Eagle
    Site: Eagle-Picher S. F. Site
    Site ID:

    Type Lead:
    Requested by: Stephanie Doolan (913) 551-7719
    Lead Scientist: Chris Staley (208) 526-5687

    Start Date: January 2002
    Expected Completion Date: June 2002
    Revised Completion Date:

    Estimated Budget:$19,000                                   Total Expenses:$900
    Revised Budgets                                           Total FY02 Expenses:$900
    Major Contaminants: Lead                                   Total 2nd Qtr. Expenses:$900
                                                 35

-------
    The Regional RPM requested that the ESD-LV TSC provide assistance in modeling wind suspension and
    downwind transport of contamination from specific point sources.

    The Eagle-Picher site is located in Joplin, Missouri.  The issue at this site is whether fugitive dust and air
    discharges may potentially recontaminate surrounding residential properties which have already been cleaned
    up by Superfund. Investigations indicate that high levels of lead in surface  soil and the facility has permitted air
    discharges from its lead smelting operations (secondary smelter of lead ingots to make leaded glass and paint.)

•   Project Name: Iowa
    Site: Iowa Army Ammunition Plant S. F. Site
    Site ID:

    Type Lead:
    Requested by: Bob Moumighan (913) 551-7913,  Scott Marquess (913) 551-7063
    Lead Scientist: Tim Ehli (702) 897-3264, Ken Moor (208) 526-8810, Doug Akers (208) 526-6118

    Start Date: May 2001
    Expected Completion Date: October 2001
    Revised Completion Date: March 2002

    Estimated Budget: $10,000                                   Total Expenditures^ 12,041
    Revised Budget: $25,000                                    Total FY02 Expenditures:$860
    Major Contaminants: Depleted Uranium                       Total 2nd Qtr. Expenditures:$300

    The RPM requested that the BSD, TSC provide assistance in reviewing a proposed aerial radiation technology
    and determine if this technology could be implemented at the Iowa Army Ammunition Plant (1AAP) site for
    contaminant characterization purposes.

    Located in Middleton, Iowa the 19,127-acre LAAP site's primary business since 1941 has been to load,
    assemble, and pack a variety of conventional ammunition and fusing systems. Wastes currently produced at
    IAAP consists of various explosive-laden sludges, wastewater, and solids; lead-contaminated sludges; ashes
    from incineration and open burning and explosives; and waste solvents from industrial and laboratory
    operations.  Past operations also generated waste pesticides, radioactive wastes and incendiaries.

    The TSC obtained the results of a number of previously conducted aerial surveys. Evaluating the results of
    these surveys will enable the TSC to better evaluate the efficiency of this technology and its application at the
    IAAP site. Following the review of available data the TSC provided the report titled "Detection of Depleted
    Uranium and Casium-137 Using the AMS Bell 412 Aerial Survey System and the Kiwi Ground Survey
    System."  The TSC provided information to the Region about a radiation survey that USDOE-Oak Ridge
    completed at the Iowa Army Ammunition site. Additional support is anticipated.

•   Project Name: Oronogo-Duenweg
    Site: Oronogo-Duenweg Mining Belt S. F. Site
    Site ID:

    Type Lead:
    Requested by: Mark Doolan (913) 551-7196 Jay Cornish (406) 494-7329
    Lead Scientist: John Zimmerman (702) 897-3279

    Start Date: December 1999
    Expected Completion Date: July 2000
    Revised Completion Date: June 2002

                                                36

-------
    Estimated Budget: $27,000
    Revised Budget:$38,000
    Major Contaminants: Lead
Total Expenditures:$29,742
Total FY02 Expenditures:$7,873
Total 2nd Qtr. Expenditures:$5,337
    The RPM requested that the BSD, TSC provide assistance in the in-vitro analysis of soil samples that are part of
    a treatability study being conducted by the Region.

    The Oronog-Duenweg Mining Belt site, which covers 6,400 acres, is considered part of the Tri-State Mining
    District of Missouri, Kansas, and Oklahoma. Two other sites in the district, Cherokee County in Kansas and
    Tar Creek in Oklahoma, were placed on the NPL in 1983. Lead and zinc ores, as well as some cadmium ores ,
    were mined from 1948, to the late 1960's, with the greatest activity occurring in an area between Oronogo and
    Duenweg northeast of Joplin.

    Mining efforts were originally performed by independent operations that, in later years, were organized by
    several area mining companies.  The site is honeycombed with underground workings, pits, shafts (open,
    closed, and collapsed), mine tailings, waste piles, and ponds holding tailing waters, An estimated 10 million
    tons of wastes or tailings are on the site.

    Tests conducted in 1977 by the U. S. Geological Survey found on-site groundwater and surface water to be
    contaminated  with heavy metals including lead, zinc, and cadmium from the mining operations. Potential risks
    may exist through drinking contaminated surface water and groundwater or coming into direct contact with
    contaminated  water.

    The TSC received and reviewed the work plan titled "Phosphate Stabilization of Heavy Metals-Contaminated
    Mine Waste Yard Soils, Joplin, Missouri NPL Site". Comments were provided to the RPM. The analytical
    QAPjP was reviewed. Comments were provided to the RPM.  The samples for this in-vitro analysis were
    provided to the TSC.  The samples were extracted and analyzed.  Following the analysis the TSC provided the
    Region with a spread sheet that contained the arsenic and lead level results. The TSC received a number of
    additional samples for lead analysis. The samples were extracted and analyzed.  Following a quality control
    review the analytical report was finalized and provided to the Region.

REGION 8

•   Project Name: Eureka
    Site: Eureka Mills S. F. Site
    Site ID:

    Type Lead:
    Requested by: Paula Schmittdiel (303) 312-6861, Mary Goldade (303) 312-7024
    Lead Scientist: Bill Cole (702) 897-3255

    Start Date: May 2001
    Expected Completion  Date: November 2001
    Revised Completion Date: July 2002
    Estimated Budget: $12,000
    Revised Budget:$48,000
    Major Contaminants: Metals
Total Expenditures:$32,215
Total FY02 Expenditures^ 16,208
Total 2nd Qtr. Expenditures^ 10,040
    The RPM requested that the ESD, TSC provide assistance in utilizing XRF technologies for characterizing soils
    contaminated with lead and arsenic.
                                                  37

-------
    The Eureka Mills site located in Utah is contaminated with heavy metals. This contamination apparently
    occurred during the mining and milling operations.

    The TSC provided the Region with the draft report titled "Wavelength and Energy Dispersive X-Ray
    Fluorescence - A Brief Technology Comparison." The RPM and a TSC representative meet with Regional
    personnel and Regional contractors at the site to discuss the use and application of the XRF technology. During
    this meeting it was decided that samples would be collected and sent to the TSC for sample preparation, and
    then sending aliquots to two different laboratories for analysis.

    The TSC received site samples. The samples were mixed, containerized, and sent to the laboratories for
    analysis. The TSC will participate in data quality assessment of the XRF analysis and in finalization of the
    wavelength and energy dispersive XRF report.

•   Project Name: Gilt
    Site: Gilt Edge Mine S. F. Site
    Site ID:

    Type Lead:
    Requested by: Ken Wangerud (303) 312-6703
    Lead Scientist:  Clark Scott (208) 526-2919

    Start Date: March 2002
    Expected Completion Date:October 2002
    Revised Completion Date:

    Estimated Budget: $25,000                                   Total Expenditures:$800
    Revised Budget:                                             Total FY02 Expenditures:$800
    Major Contaminants: Cyanide                                 Total 2nd Qtr. Expenditures:$800

    The RPM requested that the BSD- LV TSC provide assistance in assessing the use of electromagnetic
    geophysical survey methods to conduct short and long term monitoring of contaminant generation and transport
    within the Ruby Waste Rock Repository.

    The Gilt Edge Mine located near Deadwood, SD is located about 5 miles east of Lead at the headwaters of cold-
    water fisheries and municipal water supplies of the northern Black Hills. It is a 258-acre open pit, cyanide heap
    leach gold mine, developed in highly sulfidic ore bodies. The operator became solvent, leaving 150 million
    gallons of acidic, heavy-metal laden water in three open pits. As well as millions of cubic yards of acid-
    generating waste rock that need cleanup and long-term treatment.

•   Project Name: Lowry
    Site: Lowry Landfill S. F. Site
    Site ID:

    Type Lead:
    Requested by: Gwendolyn Hooten (303) 312-6646
    Lead Scientist:  Ken Moor (208) 524-8810

    Start Date: March 2000
    Expected Completion Date: September 2000
    Revised Completion Date: August 2002
                                                  38

-------
    Estimated Budget: $21,000                                   Total Expenditures:$29,661
    Revised Budget: $45,000                                     Total FY02 Expenditures:$l,007
    Major Contaminants: Radionuclides                           Total 2nd Qtr. Expenditures^ 100

    The RPM requested that the ESD-LV TSC provide assistance in plutonium and americium performance
    evaluation standards.

    This site is located about 20 miles southeast of downtown Denver, Colorado, in unincorporated Arapahoe
    County. From the mid-1960s until  1980, the site was operated as an industrial liquid waste and municipal solid
    waste landfill. Liquid wastes disposed of at the site included hazardous substances such as VOCs and heavy
    metals. In 1980, waste disposal was restricted to municipal solid waste.  In 1984, the site was placed on the
    National Priorities List (NPL).  From 1984 to 1993, studies were performed to define the nature and extent of
    contamination, to estimate potential health and environmental risks, and to evaluate cleanup alternatives for the
    site.

    The TSC reviewed site data and the proposed sampling/analysis plan.  Information concerning descriptive
    laboratory detection levels were also received and reviewed.  The TSC discussed the proposed PE sampling
    plan with the RPM. The analytical labs sent sample bottles.  The TSC spiked the bottles with AM-241 and
    plutonium -238 and -239.  The spiked samples were sent to the Colorado State laboratory.  The TSC responded
    to a number of questions from the Region pertaining to the prepared P. E. samples.  The TSC received a request
    from the RPM for a geophysicist to present a slide show on potential geophysical methods that could be used to
    characterize the sub-surface at the Lowry Landfill. A presentation on geophysical methods and suggested
    methods that may be applicable for site characterization was provided to Regional, State, contractor and PRP
    personnel. Additional support is anticipated.

REGION 9

•   Project Name: Aerojet
    Site: Aerojet General Corp. S. F. Site
    Site ID:

    Type Lead:
    Requested by: Steve Remaley (415) 972-3802, Charles Berrey (415) 972-3146, K. Mayer (415) 972-3176
    Lead Scientist: J. Zimmerman (702) 897-3279, Vicki Ecker (702) 897-3233,  Russell Plumb (7002) 897-3265

    Start Date: May 1999
    Expected Completion Date: October 1999
    Revised Completion Date: August 2002

    Estimated Budget: $19,000                                   Total Expenditures:$80,229
    Revised Budget: $85,000                                     Total FY02 Expenditures:$15,856
    Major Contaminants: Organics                                Total 2nd Qtr. Expenditures:$7,582

    The Regional TPO requested that the ESD-LV TSC provide  assistance in auditing GC and GC/MS laboratory
    data, and to provide analytical protocol assessments.

    The Aerojet General Corp. covers 8,500 acres near Rancho Cordova, 15  miles east of Sacramento. Since 1953,
    Aerojet and its subsidiaries have manufactured liquid and solid propellant rocket engines for military and
    commercial applications and have formulated a number of chemicals, including rocket propellant agents,
    agricultural, pharmaceutical, and other industrial chemicals.  In addition, the Cordova Chemical Company
    operated a chemical manufacturing  facility on the Aerojet complex from 1973 to 1979. Both companies


                                                  39

-------
    disposed of unknown quantities of hazardous waste chemicals, including TCE and other chemicals associated
    with rocket propellants, as well as various chemical processing wastes.

    The initial effort by the TSC was to identify the contents of the provided tapes and disks.  Following an
    assessment of the tapes and disks a letter report describing the contents was provided to the Region. Due to
    missing data the data audit was discontinued. The TPO then requested the TSC to provide available
    information pertaining to hydrazine in water. The TSC provided the Region with a report titled
    "Considerations on the Handling and Storage of Aqueous Samples to be Analyzed for Hydrazine." Additional
    assessment of Aerojet analytical protocols was accomplished. A report providing an assessment of perchlorate,
    hydrazine, and MDMA analytical protocols was provided to the Region. The TSC provided the RPM an
    assessment of 49 analytical SOPs that are being used to analyze samples. The TSC reviewed a revised SOP for
    hydrazine to identify inadequacies, determine if appropriate methods are being used, and to verify consistency
    with EPA and state guidance.  Following the finalization of all SOP's by the PRP, the RPM requested the TSC
    to review them and identify any deficiencies. The TSC completed the review and provided comments and
    suggestions to the Region. The TSC received, reviewed, and provided the Region comments and suggestions
    pertaining to the analytical protocol titled "Determination of Base/Neutrals and Acids Revision 3." The TSC
    responded to a number of inquiries dealing with "NDMA" and provided the Region with the report titled
    "NDMA Detection Levels for the Aerojet Superfund Site". The TSC reviewed eight revised and one new
    laboratory analytical method and provided the Region with the report titled "Review of Analytical Methods
    Prepared/Revised by Aerojet Laboratories July 13, 2001." The TSC reviewed a number of revised Aerojet
    laboratory analytical methods, and provided the Region with comments and suggestions. The TSC reviewed
    the revised NDMA analytical method and provided comments to the RPM. The TSC was requested to review
    "Acculabs, Inc., SOP and App. B. Determination of Perchlorate in Water and Solid Samples Using
    ESI/LC/MS/MS." This review is in process. The TSC also agreed to accept water samples.  From the Salton
    Sea, spike them with a perchlorate standard and send the samples to a number of laboratories for analysis.

•   Project Name: Alark
    Site: Alark Hard Chrome S. F. Site
    Site ID:

    Type Lead:
    Requested by: David Stensby (415) 972-3246
    Lead Scientist: Ken Moor (208) 526-8810 Clark Scott (208)  526-2919

    Start Date: November 2001
    Expected Completion Date: August 2002
    Revised Completion Date:

    Estimated Budget:$ 15,000                                   Total Expenditures^ 1,300
    Revised Budget:$                                            Total FY02 Expenditures^ 1,300
    Major Contaminants: TCE and Chromium                      Total 2nd Qtr. Expenditures:$600

    The Regional RPM requested that the ESD-LV TSC provide assistance in utilizing geophysical methods in
    fractured rock to delineate the lateral and vertical extent of chromium and TCE contamination in the aquifer.

    Alark Hard Chrome is  a relatively small site located in downtown Riverside, CA.  It operated as a chrome plater
    from 1971 until closure in 1985.  It was ordered closed when the County Health Dept. found Alark using a
    sump on site for waste disposal. Plating solutions were dumped in the sump and allowed to percolate into soil.
    As a result, there was severe soil contamination and also groundwater contamination. The State DTSC
    investigated and excavated over 1,200 cubic yards of soil from the area of the sump to 40 feet bgs.  DTSC also
    installed 10 groundwater monitoring wells. Groundwater has been impacted by chromium and TCE.


                                                 40

-------
    The TSC received the document titled "Groundwater Remedial Investigation Report for the Alark Hard Chrome
    Site Riverside, California" for review.  Following the review of this document the TSC also participated in a
    number of conference calls to further discuss appropriate geophysical technologies that could be used to
    characterize site contaminants.

•   Casmalia
    Site: Casmalia Disposal S. F. Site
    Site ID:

    Type Lead:
    Requested by: Kent Kitchingman (415) 972-3142
    Lead Scientist: Jeff Sondrup (208) 526-8396 Bob Starr (208) 526-0174

    Start Date: November 2000
    Expected Completion Date: May 2001
    Revised Completion Date: July 2002

    Estimated Budget: $20,000                                   Total Expenditures:$6,471
    Revised Budget:                                             Total FY02 Expenditures:$3,471
    Major Contaminants: Organics                                Total 2nd Qtr. Expenditures:$200

    The Regional RPM requested that the ESD-LV TSC provide assistance in determining flow paths of
    contaminated groundwater on and near the Casmalia site.

    The Casmalia Disposal Site is a 252-acre inactive commercial hazardous waste treatment, storage, and disposal
    facility located in Santa Barbara County, California, 10 miles southwest of the City of Santa Maria and four
    miles from the pacific Ocean. Between 1973 and 1989, the site accepted approximately 4.5 billion pounds of
    waste.  Facing multiple enforcement actions, the site's owners and operators stopped taking shipments of waste
    material in 1989. In the early 1990s. The owners and operators abandoned efforts to properly close and clean
    up the site. Conditions at the site presented imminent and substantial endangerment to human health and
    environment.

    The TSC had a conference call with the RPM and sent information to the Region pertaining to the qualifications
    of the INEEL staff that will participate  on this project. The TSC received, and is currently reviewing, the report
    titled "Groundwater Data Summary Report  1992-2000 Casmalia Waste Management Facility Casmalia, CA."
    The RI/FS workplan will also be sent to the TSC for review. The TSC provided the Region with information
    pertaining to the use of geophysical (electrical/magnetic) methods that may be useful to characterize site
    contaminants. The TSC participated in a number of conference calls with the RPM Concerning possible
    geophysical methods that maybe used to characterize site contaminants.

•   Project Name: City of Phoenix
    Site:  City of Phoenix 19* Avenue Landfill S. F. Site
    Site ID:

    Type Lead:
    Requested by: Nadia Hollan (415) 744-2363
    Lead Scientist: Mike Abbott (208) 526-8596

    Start Date: May 2000
    Expected Completion Date: November  2000
    Revised Completion Date: June 2002


                                                  41

-------
    Estimated Budget: $18,000
    Revised Budget: $30,000
    Major Contaminants: Organics
Total Expenditures:$24,292
Total FY02 Expenditures^ 1,750
Total 2nd Qtr. Expenditures:$800
    The RPM requested that the ESD-LV TSC provide assistance in reviewing ambient air monitoring and
    monitoring plans.

    This 213-acre site operated as a landfill between 1957 and 1979, during which about 9 million cubic yards of
    municipal refuse, solid and liquid industrial wastes, and some medical wastes were deposited. However, the
    site was closed in 1979 due to the threat of flooding from the Salt River Channel. This remedial action is
    designed to mitigate threats resulting from flooding.  The primary contaminants of concern in the soil/refuse
    include VOCs such as toluene and xylenes.

    The TSC received three documents for review: The Ambient Air Monitoring Plan and two Ambient Air
    Monitoring reports. Following the review it was felt that the four landfill air sampling tests were well
    conducted and that the results showed differential concentrations that were well below levels of concern.
    However, the number of samples (total of 8 events per cell) was not adequate to draw the conclusion that long-
    term VOC emissions ftom the landfill are of no concern. The sampling experimental design (discrete  4-hour
    upwind/downwind samples) has two inherent and compounding limitations that cannot be overcome with a
    limited number of samples: 1) the inability to distinguish source emissions from the relatively high background
    concentrations in the area and 2) the dilution of source emissions to below instrument detection limits  because
    of air transport/dispersion to the downwind samplers. Some additional sampling was recommended.

    The TSC received a request from the RPM in early August for information on Open Path Fourier Transform
    Infrared Spectrometry (FTR), and whether it could be a useful tool at the landfill. The TSC responded on
    August 17 with some background information on the technology and some experience at the INEEL using this
    technology. The TSC believes that this technology would be a useful tool to address the landfill issues. The
    TSC received volumes 1 and 2 of the Ambient Air Monitoring Program Report and the Ambient Air
    Monitoring Plan for review.  The review of these documents was completed and the report titled "INEEL
    Review Comments on the Ambient Air Monitoring Program Report for Nineteenth (19th) Avenue Landfill-
    Phase II." A number of conference calls with the RPM were completed. The TSC received information
    pertaining to the Region's review of the Phase II Ambient Air Report.  The TSC completed the review of the
    "Phase II Report."  The TSC participated with the RPM and J. Paull a Region IX Toxicologist in a review and
    discussion of the Phase 2 Ambient Air Monitoring Program. Additional support is anticipated.

•   Project Name: Eglin
    Site: Eglin AFB S. F. Site
    Site ID:

    Type Lead:
    Requested by: Steve Remaley (415) 972-3802
    Lead Scientist: John Zimmerman (702) 897-3279

    Start Date: August 2001
    Expected Completion Date: June 2002
    Revised Completion Date:
    Estimated Budget:$ 18,000
    Revised Budget:$
    Major Contaminants: Organics/Inorganics
Total Expenditures:$3,689
Total FY02 Expenditures:$3,689
Total 2nd Qtr. Expenditures:$3,658
                                                 42

-------
The Regional RPM requested that the ESD-LV TSC provide assistance in reviewing a laboratory's analytical
documents and perform a data audit on GC and GC/MS.

The TSC received analytical data and completed the audit and provided the Region with the report titled "Audit
Report of Hard Copy and Electrical Data from Columbia Analytical Services, Inc., Jacksonville, Florida for the
Eglin Air Force Base Superfund Site."

Project Name: Fort Ord
Site: Fort Ord S. F. Site
Site ID:

Type-Lead:
Requested By: John Chesnutt (415) 972-3005
Lead Scientist: Anita Singh (702) 798-3234

Start Date: September 2000
Expected Completion Date: March 2001
Revised Completion Date: July 2002

Estimated Budget:$35,000                                   Total Expenditures:$43,443
Revised Budget:$55,000                                     Total FY02 Expenditures:$15,536
Major Contaminants: UXO                                  Total 2nd Qtr. Expenditures:$5,708

The RPM requested that the ESD-LV TSC provide assistance in reviewing the Unexploded Ordnance (UXO)
Statistical Sampling (SiteStats/GridStats) and Risk Assessment (QiECert) Methodology. These programs were
developed for conducting engineering evaluation/cost analysis (EE/CA), and UXO investigation for various
ordnance and explosives (OE) located on Formerly Used Defense Sites (FUDS).  Three statisticians,  Dr's Max
Engelhardt, Ashok K. Singh, and Anita Singh, were asked by the TSC to review and assess provided document
and computer programs.

The Fort Ord site, located in Marina, CA., was established by the U. S. Army as a maneuver area and field
artillery target zone.  Chemicals and hazardous wastes are stored at on-site facilities before they are transported
and disposed of off-site. There are several areas of contamination on sites.  One of these areas includes three
inactive landfills that once were used to dispose of residential and commercial waste, In addition to UXO the
facility has leaking hazardous waste tanks, containers of waste oil and various automotive  chemicals  and
chemical storage areas.

The primary focus of this evaluation will be to conduct an assessment of "SiteStats/GridStats" and OECert that
are used to characterize sites contaminated with UXO. There are questions pertaining to the proper use and
application of the mathematical and statistical approaches that have been incorporated in these programs. The
data for this assessment was provided by the USAGE in Huntsville, Alabama. The TSC completed a report
titled "UXO Sampling and Characterization Using Indicator Kriging an Alternative Approach for Estimating
Probabilities of Finding UXO Item." This report provided to the Region utilized Fort Ord and Buckley Field
data. The TSC also provided the Region with the document titled "Review of the ORNL/TM-13588  Report."
Following additional reviews the TSC provided the following two reports: "Summary of Recent Results on Site
Stats Evaluation Performed After the August 9-10, 2000, Partnership Meeting Between USAGE and  EPA
NERL Las Vegas" and "UXO Sampling and Characterization Using Indicator Kriging an Alternative Approach
for Estimating Probabilities of Finding UXO Items." Support was provided by the TSC in reviewing the
preliminary draft ordnance and explosives sampling and analysis plan. The TSC also provided comments and
suggestions pertaining to the statistical programs that are being suggested for characterizing UXO at  the Fort
Ord site. Comments pertaining to the "Modified Spatial Analysis " was provided to the Region.


                                             43

-------
    The TSC provided a number of reviews of the spatial analysis software that is being developed by Ramzi
    Mahmood for the USAGE.

•   Project Name: Conoco Hayden-Culver City
    Site: Hayden Property #2 S. F. Site
    Site ID:

    Type Lead:
    Requested by: Steve Remaley (415) 972-3802
    Lead Scientist: John Zimmerman (702) 897-3279

    Start Date: August 2001
    Expected Completion Date: May 2001
    Revised Completion Date:

    Estimated Budget:! 18,000                                   Total Expenditures^ 10,062
    Revised Budget:$                                           Total FY02 Expenditures:$10,062
    Major Contaminants: Organics                                Total 2nd Qtr. Expenditures:$6,808

    The Regional RPM requested that the ESD-LV TSC provide assistance in reviewing laboratory analytical
    documents and perform a data audit on GC and GC/MS data.

    The TSC received analytical data and is in the process of conducting the data audit.

•   Project Name: McClellan
    Site: McClellan AFB S. F. Site
    Site ID:

    Type Lead:
    Requested by: Steve Remaley (415) 972-3802
    Lead Scientist: John Zimmerman (702) 897-3279

    Start Date: October 2001
    Expected Completion Date: April 2002
    Revised Completion Date:

    Estimated Budget:$48,000                                    Total Expenditures:$34,695
    Revised Budget:$                                           Total FY02 Expenditures:$642
    Major Contaminants:  Organics                                Total 2nd Qtr. Expenditures:$425

    The Regional RPM requested that the ESD-LV TSC provide assistance in reviewing laboratory analytical
    documents and perform a data audit on GC and GC/MS data.

    The 2,952-acre McClellan Air Force Base (MCAB) site was established in 1936 and operates today as an Air
    Force Logistics Command Base with a primary mission of management, maintenance, and repair of aircraft,
    electronics, and communication equipment. The operation and maintenance of aircraft have involved the use,
    storage, and disposal of hazardous materials including use, storage, and disposal of hazardous materials
    including industrial solvents, caustic cleansers, low level radioactive wastes and  a variety of fuel oils and
    lubricants. Groundwater, sludge, and soil have been contaminated with volatile organic compounds (VOCs).
    People may face a health risk if they swallow or touch these contaminants. People may also be at risk if they
    eat food containing accumulated  contaminants or if they inhale contaminated dusts.


                                                 44

-------
    The TSC completed an initial data audit and provided the Region with the report title "Technical Assessment of
    Electronic Data for Volatile Organic Analysis Performed by Quanterra Incorporated." The TSC reviewed a
    work plan and the first progress report and provided the Region with comments and suggestions.  The TSC
    received additional documents and data, completed the data audit and provided the Region with the report titled
    "Audit Report of Hard Copy and Electronic Data from Columbia Analytical Services Inc. Redding, California
    for the McClellan Superfund Site." Additional support is anticipated.

•   Project Name: MGM
    Site: MGM Brakes S. F. Site
    Site ED:

    Type Lead:
    Requested by: Steve Remaley (415) 972-3802, Akemi Wayne (415) 947-4510
    Lead Scientist: Tim Ehli (702) 897-3359, John Zimmerman (702) 897-3279

    Start Date: July 1999
    Expected Completion Date: February 2000
    Revised Completion Date: July 2002

    Estimated Budget: $ 18,000                                  Total Expendirures:$88,734
    Revised Budget:$98,000                                     Total FY02 Expenditures:$4,095
    Major Contaminants: Organics                                Total 2nd Qtr. Expenditures:$3,971

    The Regional Technical Project Officer (TPO) requested that the ESD-LV TSC provide assistance in auditing
    laboratory data.

    Located in Cloverdale, California this 5-acre site includes an automotive brake casting plant, a paved area
    surrounding the plant, and an open field.  Land use in the area is mixed residential/agricultural/industrial. From
    1965 to 1972, wastewater containing PCBs was discharged on the site property. Wastewater containing
    ethylene glycol was disposed of on-site from 1972 to 1981. The ethylene glycol acted as a co-solvent with
    water, and facilitated the transport of PCBs in the soil. About 13,510 cubic yards of soil is contaminated with
    PCBs at concentrations up to 4500ppm. VOCs have also been detected in groundwater; however, the source of
    this contamination is unknown. The primary contaminants of concern affected soil, sediments, and surface
    water are VOCs including TCE and benzene.  The primary contaminants affecting groundwater are PCBs.

    The TSC received from the Region and Regional IG's office a number of CD-ROMs's and diskettes containing
    laboratory data. The TSC has reviewed a number of these data files for questionable manual integrations. A
    number of memorandums documenting these suspect files have been provided to the Region. The TSC
    developed a method file for auditing laboratory analytical data and responded to questions about types and
    numbers of files that were reviewed in order to match missing file requests to specific laboratories. The TSC
    also received two additional  CD's of data which were not included in the original data package.  The TSC
    completed an initial assessment of the two CD's. The status of this assessment was provided to the Region.
    Completing this data audit required "target" software. All data received (i.e. CD's) was sent to Region VI
    because the TSC did not have the "Target" software.  Region VI failed to complete the audit so the data was
    sent back to the TSC. The TSC purchased the "Target" software and was trained on the use  of this software.
    The TSC conducted data audits and provided the Region with the reports titled "Assessment of Electronic Data
    from Sequoia Analytical Laboratory Inc.", "Evaluation of Target Software Files for Sequoia Analytical
    Laboratory MGM Brakes S. F. Site" and "Expanded Assessment of Electronic Data from North Creek
    Analytical Laboratory Inc." The TSC had a number of technical discussions with the Region.  Following these
    discussions the TSC clarified a number of issues that were in previously identified reports. The TSC conducted
    an audit of electronic data files from the North Creek Laboratory and provided the report titled "Expanded


                                                 45

-------
    Assessment of Hard Copy and Electronic Data from North Creek Analytical Laboratory Inc."  The TSC sent
    Data Auditors to the Regional office to confer with the IG's and Regional Consuls Office. A number of
    conference calls between the TSC and Regional Staff were completed.  The TSC was requested by the USDOJ
    in San Francisco to attend a meeting and present, and discuss, a number of issues that were identified in
    previous audit reports.

•   Project Name: Midway
    Site: Midway Village S. F. Site
    Site ID:

    Type Lead:
    Requested by: Steve Remaley (415) 972-3802
    Lead Scientist: John Zimmerman (702) 897-3279

    Start Date: October 2001
    Expected Completion Date: May 2002
    Revised Completion Date:

    Estimated Budget:$30,000                                   Total Expenditures^ 18,523
    Revised Budget:$                                           Total FY02 Expenditures^ 18,523
    Major Contaminants: Organics/Inorganics                      Total 2nd Qtr.  Expenditures:$397

    The Regional RPM requested that the ESD-LV TSC provide assistance in auditing laboratory data obtained
    from the analysis of samples.

    The Midway Village site located in Dale City is a marsh area filled with dirt from an old gas manufacturing
    plant.  Community concerns have prompted Region IX to take a look at this site with regards to PAH
    concentrations and other potential contaminants.

    Following an assessment of provided laboratory data, the TSC provided the Region with the report titled "Audit
    Report of Hard Copy and Electronic Data from Columbia Analytical Services, Kelso, Washington."  The TSC
    participated in a number of conference calls discussing issues that were identified in the audit report.

•   Project Name: Modesto
    Site: Modesto Groundwater Contamination S. F. Site
    Site ID:

    Type Lead:
    Requested by: Steve Remaley (415) 972-3802
    Lead Scientist: John Zimmerman (702) 897-3379

    Start Date: November 2000
    Expected Completion Date: March 2001
    Revised Completion Date: April 2002


    Estimated Budget: $ 12,000                                  Total Expenditures:$4,882
    Revised Budget:                                            Total FY02 Expenditures:$650
    Major Contaminants: Organics/Inorganics                      Total 2nd Qtr. Expenditures:$300
                                                 46

-------
    The Regional RPM requested that the ESD-LV TSC provide assistance in reviewing a laboratory's Quality
    Assurance Manual (QAM).  The manual and the identified guidance will be used for analyzing site samples.

    The City of Modesto began monitoring groundwater at this site in 1984 and found that 12 of the 24 wells tested
    were contaminated. Municipal Well #11 was found to be contaminated with tetrachloroethylene (PCE) and was
    taken out of service. Well #11 is one of 35 municipal wells in the city of Modesto and contributes to the city's
    municipal water service.

    The TSC reviewed the QAM and associated quality assurance/quality control procedures and requirements, and
    provided the Region with the report titled "Review of the EMAX Laboratories, Inc. Quality Assurance
    Manual." The TSC participated in a number of conference calls with the Region pertaining ro TSC comments
    and suggestions. Additional support was provided to the Regional TPO pertaining to questions about the QAM.
    Additional support is anticipated.

•   Project Name: Motorola
    Site: Motorola Inc. S. F. Site
    Site ED:

    Type Lead:
    Requested by: Nadia Hollan (415) 972-3187
    Lead Scientist: L. Peterson (208) 528-8718x170, K. Sorenson (208) 528-8718x120, Bob Starr (208) 526-1170

    Start Date: January 1999
    Expected Completion Date: August 1999
    Revised Completion Date: July 2002
    Estimated Budget: $25,000
    Revised Budget: $95,000
    Major Contaminants: Organics

    Project Name: Motorola
    Site: OU-1
    Site ID: SSID #48

    Project Name: Motorola-Honeywell
    Site: OU-2
    Site ID: SSID #BE

    Project Name: Motorola-Canon
    Site: OU-2
    Site ID:

    Project Name:  Motorola
    Site: OU-3
    Site ID: SSID #BF
Total Expenditures:$63,750
Total FY02 Expenditures:$6,800
Total 2nd Qtr. £xp:$2,600

Total Expenditures:$10,414
Total FY02 Expenditures:$2,500
Total 2nd Qtr. Expenditures^ 1,800

Total Expenditures:$27,031
Total FY02 Expenditures:$3,300
Total 2nd Qtr. Expenditures:$300

Total Expenditures:$3,786
Total FY02 Expenditures:800
Total 2nd Qtr. Expenditures:$300

Total Expenditures^ 17,032
Total FY02 Expenditures:$200
Total 2nd Qtr. Expenditures:$200
   The RPM requested that the ESD-LV TSC provide assistance in evaluating a soil gas monitoring effort by the
   PRP's and assistance in characterizing site organic contaminants.  The RPM has requested that costs per OU-1,
   OU-2 and OU3 be documented. As shown above total cost and cost per OU are identified.
                                                 47

-------
This Phoenix, Arizona site is located in a mixed residential/commercial area, and is used as a manufacturing
facility. The manufacturing operations required the use of solvents.  Underground storage tanks were
discovered to be leaking, which resulted in groundwater and soil contamination both on-and off-site. The
selected remedy for this operable unit addresses groundwater contamination. The primary contaminant of
concern is TCA.

Operable Unit Two is an area of contaminated groundwater down gradient of Operable Unit One.  The selected
remedy is an interim remedy designed to address groundwater that is contaminated with volatile organic
compounds (VOCs). The major components of this remedy consist of extraction of groundwater in the vicinity
of Interstate 10 and Van Buren Street, treatment of extracted water near extraction locations by either air
stripping with off-gas treatment by synthetic resin adsorption, or advanced oxidation based on final design
considerations, and injection of treated water back into the aquifer in locations allowing additional control of
the contaminant plume. The TSC reviewed a number of site documents and provided comments.

The existing data presented in site reports were of high quality but several significant data gaps were identified.
Recommendations were made for installation of at least two new groundwater monitoring wells with soil gas
ports. A peer reviewed paper Design, Installation, and Uses of Combination Ground Water and Gas Sampling
Wells (Hubble, Wood, and Higgs, 1998) published by INEEL scientists was provided as a recommendation to
assist in collection of soil gas data with installation of new groundwater wells.

The TSC provided review comments on The Soil Vapor Extraction System Evaluation Report. The
Environmental Restoration Directorate Sample Management Office reviewed the L&V reports supplied as
Appendix B-H.  While some discrepancies were noted in laboratory technique, the data were validated for use
in evaluating the effectiveness of the Soil Vapor Extraction System (SVE).  An independent technical
memorandum produced by Golder Associates (GA) was also reviewed. The GA evaluation methodology was
appropriate and the conclusion that the SVE system achieved the goals of the project was confirmed. It was
noted however that the confirmation sampling was conducted just a few days after shutdown of the extraction
system which did not allow sufficient time for contaminant concentration rebound.  The recommendation was
to conduct additional sampling to confirm the initial results.

The TSC provided the Region with comments and recommendations pertaining to the 53rd Street soil gas data
analysis. The TSC received a CD Rom of scanned site documents related to soil investigations and hard copies
of related items. The purpose of the document review is to provide assistance in determining the sufficiency of
site characterization at the site and beyond the CY and SWPL areas, and whether it is likely that further soils or
groundwater cleanup will be necessary. The TSC is currently reviewing the site documents and will identify
gaps as they are encountered. The TSC received the document titled "Characterization of Inorganic
Constituents in Groundwater, 53rd Street Superfund Site for Motorola, Inc." dated July 1999 for review.

Two modeling reports were received.  The first report entitled "Preliminary Review of Groundwater Flow
Models at the Motorola 53rd Street Superfund Site" and the second report titled "Summary of Preliminary
Groundwater Flow and Contaminant Transport Simulations." Those reports were both prepared by the
Hydrodynamic Group (HG) and present reviews of previous modeling efforts plus a description of a new model
that HG prepared to help answer some questions on the potential effectiveness of a proposed pump and treat
remedy. There were some valuable discussions, recommendations, and insights in the reports, but there were
also some shortcomings and issues that need to be resolved. The TSC briefly outlines an approach for
correcting major deficiencies and resolving problems. Ron Amett provided written review comments in a
report entitled "Review of Two Groundwater Flow and Contaminant Transport Model Reports for Motorola
53rd Street Superfund Site, Phoenix, Arizona," which was transmitted to Nadia Hollan.

The TSC received six additional documents for review. A review of these documents was completed. The
TSC  also participated in a conference  call with the RPM and the Arizona State Attorney Generals Office. The
                                              48

-------
    TSC reviewed ADEQ calculations pertaining to soil vapor extraction mass removal analysis and provided some
    recalculations.  The TSC also provided the following documents to the RPM: "Review of Summary of
    Preliminary Groundwater Flow and Contaminant Transport Simulations Reports for OU-2 System Phoenix,
    AZ. Draft Version 2.0," dated August 2000 and "Review of Revised Groundwater Modeling Report on the
    Motorola/Honeywell OU-2 System Superfund Site" dated August 2000. The TSC also participated in a number
    of conference calls and meetings in San Francisco and Phoenix, AZ. TSC representatives attended a Honeywell
    site review 20-24 October. The review included an on-site tour of the Honeywell facility with a focus on the
    highest probability source area (LACC, oil chip yards, engine test cells, and return well.) An additional day
    included consultation on review of the Honeywell Conceptual Site Model and a meeting with the technical
    consultants for Honeywell. On November 6, 2000 the technical consultants presented their interpretation of the
    geology and hydrology and the flow and transport model supporting Motorola's interpretation of historical
    plume development. Meetings with both parties have demonstrated that significant effort has been expended
    on collection and interpretation of site-specific  data, and progress is being made on development of a site
    conceptual model.

    The TSC participated in an on-site technical working group.  The report titled "Review of Potential Source
    Areas Investigation Work Plan Honeywell International, Inc. 32nd Street Facility" was provided to the Region.
    A number of site documents were received (i.e., Draft Five Year Review) by the TSC and were reviewed. A
    report identifying additional site characterization investigations at the Honeywell Street facility was received.
    The TSC participated in a number of conference calls pertaining to potential remedial technologies

•   Project Name: Pemaco
    Site: Pemaco Maywood S. F. Site
    Site ID:
    Type Lead:
    Requested by: Steve Remaley (415) 972-3802
    Lead Scientist: Vicki Ecker (702) 897-3223

    Start Date: September 2001
    Expected Completion Date: June 2002
    Revised Completion Date:

    Estimated Budget:$29,000                                    Total Expenditures:$13,190
    Revised Budgets                                            Total FY02 Expenditures:$13,190
    Major Contaminants: Organics/Inorganics                      Total 2nd Qtr. Expenditures:$859

    The Regional RPM requested that the ESD-LV TSC provide assistance in reviewing the laboratories Quality
    assurance Plan and the analytical Standard Operating Procedure.

    Pemaco Maywood is a four-acre facility located in Maywood, California that housed a chemical blending
    facility operated by Pemaco, Inc. Between the  1940's and 1991 hazardous chemicals that were stored at the
    facility in underground and aboveground storage tanks and drums included chlorinated and aromatic solvents,
    flammable liquids, petroleum hydrocarbons, and other volatile organic compounds. There were 31
    underground storage tanks, six aboveground storage tanks, and more than 400 drums on site when the facility
    was investigated by the Los Angeles County Fire Department in 1992.

    During the Expanded Site Inspection (ESI) conducted in May 1997, several volatile organic compounds were
    identified in near-surface and deep soil samples, as well as perched ground water and an underlying regional
    aquifer. Floating product consisting of total petroleum hydrocarbons (gasoline) and 12 volatile organic
                                                 49

-------
 compounds was recovered from three wells drawing from the perched ground water.  Aqueous samples from 10
 other wells in the perched ground water sone contained several chlorinated hydrocarbons such as
 tetrachloroethane. (PCE), trichloroethene (TCE), 1,1,1-trichloroethane (TCA), 1,1,-and 1,2-dichloroethene, 1,1-
 dichloroethane, and vinyl chloride.

 The TSC reviewed the QAPjP and the SOPs and provided the Region with the report titled "Review of the A4
 Scientific, Inc. Quality Assurance Plan and Standard Operating Procedures Applicable to the Analysis of the
 Samples from the Pemaco Maywood Superfund Site." Additional support is anticipated.

 Project Name: Pukola
 Site: Pukola Wood Treating S. F. Site
 Site ID:

 Type Lead:
 Requested by: Steve Remaley (415) 972-3802
 Lead Scientist: John Zimmerman (702) 897-3279

 Start Date: September 2001
 Expected Completion Date: June 2002
 Revised Completion Date:

 Estimated Budget:$9,000                                    Total Expenditures^ 10,642
 Revised Budget:$                                           Total FY02 Expenditures^ 10,642
 Major Contaminants:Organics/Inorganics                      Total 2nd Qtr. Expenditures:$6,860

 The Regional RPM requested that the ESD-LV TSC provide assistance in reviewing laboratory analytical
 documents and perform a data audit on GC and GC/MS data.

 The TSC received the analytical data and is in the process of conducting the data audit.

 Project Name: Sierra
 Site: Sierra Army Depot S. F. Site
 Site ID:

 Type Lead:
 Requested by: Kevin Wong (415) 972-3037
 Lead Scientist: Paul Ritter (208) 526-6686

 Start Date: June 2001
 Expected Completion Date: November 2001
 Revised Completion Date: May 2002

 Estimated Budget: $ 19,000                                   Total Expenditures:$2,315
 Revised Budget:                                            Total FY02 Expenditures: $915
 Major Contaminants: Inorganics/Organics                     Total 2nd Qtr. Expenditures:$300

 The Project Officer requested that the ESD-TSC provide assistance by participating in a work group which will
 assess the feasibility of conducting air plume testing for open bum/open detection (OB/OD) operations.

 The Sierra Army Depot located near Herlong, CA is a government owned and operated installation under the
jurisdiction of the U. S. Army Operations Support Command (OSC), Rock Island, Illinois. The depot conducts


                                             50

-------
    business 10 hours a day, Monday through Thursday, although mission operations are usually underway five or
    six days a week. CRREL personnel (USAGE) were contacted concerning OB/OD. They indicated that 2,
    4-dinitrotoulene, RDX, and nitroglycerine were the three compounds of concern.

    The TSC is currently waiting for information pertaining to work group meeting times and places.

•   Project Name: Williams
    Site: Williams AFB S. F. Site
    Site ID:

    Type Lead:
    Requested by: Steve Remaley (415) 972-3802
    Lead Scientist: John Zimmerman (702) 897-3279

    Start Date: October 2001
    Expected Completion Date: April 2002
    Revised Completion Date:

    Estimated Budget: $20,000                                   Total Expenditures^ 1,158
    Revised Budget: $                                            Total FY02 Expenditures: $ 1,15 8
    Major Contaminants: Organics                                Total 2nd Qtr. Expenditures:$724

    The Regional RPM requested  that the ESD-LV TSC provide assistance in reviewing laboratory data, QA
    documents and perform a data audit on GC/MS data.

    The 4,127-acre Williams Air Force Base (WAFB) site, located in Chandler, Arizona, was commissioned as a
    flight training school in 1941.  Contaminants from base activities include organic solvents and paint strippers,
    petroleum spills, metal plating wastes, hydraulic fluids, pesticides,  and radiological waste. Discharges and
    disposal at WAFB have resulted in soil and groundwater contamination.  Ten sites have been identified as
    contaminated areas including two fire training areas, a fuel storage area, two surface storm drainage areas, a
    hazardous material storage area, a landfill, a pesticide burial pit, a radiological disposal area, and several
    underground storage tanks.

    Following an assessment of provided laboratory data the TSC provided the Region with the report titled "Audit
    Report of Hard Copy and Electronic Data from Columbia Analytical Services, Inc. Redding, California for the
    Williams A.F.B. Superfund Site."  The TSC participated in a number of conference calls with the Region
    pertaining to issues in the audit report.

REGION 10

•   Project Name: Bunker Hill
    Site: Bunker Hill Mining S. F. Site
    Site ID:

    Type Lead:
    Requested by: Cami Grandinetti (206) 553-8696, Bill Adams (206) 553-2806
    Lead Scientist: Bob Starr (208) 526-5687, Erick Neher (208) 526-5449, Mike Roddy (208) 526-8201

    Start Date:  July 2000
    Expected Completion Date: March 2001
    Revised Completion Date: August 2002


                                                  51

-------
    Estimated Budget: $30,000
    Revised Budget: $80,000
    Major Contaminants: Inorganics
Total Expenditures:$43,712
Total FY02 Expenditures^ 1,700
Total 2nd Qtr. Expenditures:$800
    The Region X RPM has requested the ESD-LV TSC to provide assistance in the identification of innovative
    approaches for conducting vadose zone characterization, emerging fracture filling or compensation grouting
    technologies, and manipulating the geochemical environment to precipitate toxic metals. The Bunker Hill
    Mining District is located within the Coeur d'Alene River Basin in the eastern portion of the panhandle of
    northern Idaho. Historic ore mining, milling, and smelting practices have resulted in widespread mining-related
    contamination of the basin. In 1992, a ROD was signed for the non-populated areas of the Bunker Hill
    Superfund Site (BHSS), and implementation began in 1995.  In 1998, EPA initiated an RI/FS of mining-related
    contamination in the Coeur d'Alene River Basin.

    The TSC participated in a on-site visit. The purposes of the visit were to: 1) meet with Idaho State DEQ and
    Silver Valley Trustees regarding provision of technical assistance for the Success Mine pilot in which the TSC
    would develop a protocol for predicting the adsorptive capacity of materials useful in the passive treatment of
    Acid Mine Drainage (AMD); and (2) meet with EPA officials regarding request for technical assistance in
    solving problems associated with characterization of the Bunker Hill CERCLA site.

    A Scope of Work (SOW) was prepared and sent to the Region during November 2000. The SOW details the
    tasks for evaluating the feasibility of determining recharge areas that are contributing to the metals load in the
    mine drainage at the Bunker Hill mine. Following a review of appropriate geologic and hydrogeologic
    information the determination that a tracer test would yield the desired information was made. These
    suggestions and recommendations were provided to the Region in the report titled "Review of Bunker Hill
    Mine Hydrogeologic Data and Tracer Test Evaluation" dated May 7,2001.

    Based on the hydrology of the site and significance of snow melt infiltration, the tracer studies were delayed.
    The TSC met with the new Regional RPM in Seattle and discussed past support that had been provided. The
    RPM indicated he would let the TSP know what additional support would be required.

                               SUPERFUND SHORT-TERM REQUESTS

    Project Name:  Short Term Requests
    Site: Short Term Requests
    Site ID:

    Type-Lead:
    Requested by: See Below
    Lead Scientist:  TSC/ESD Staff Scientists

    Start Date: October 2000
    Expected Completion Date: September 2001
    Revised Completion Date:
    Estimated Budget: $40,000
    Revised Budget: $65,000
    Major Contaminants: Variable
Total Exps:$5,558
Total FY02 Exps:$5,558
Ttl 2nd Qtr. Exps:$2,058
PC&B:$2,600
PC&B:$2,600
PC&B:$1,800
    TSC requests that can be completed within a 60-hour period. The ESD is requested to provide quick-turn-
around support.  Projects may include:
                                                  52

-------
•       Emergency Response - on-site field measurements, such as geophysics, soil gas, and XRF.

•       Emergency Response - Laboratory support, such as the analysis of chemical and radiological contaminants.

•       Review of reports and work plans, sampling/monitoring protocols, and analytical protocols and
        approaches.

•       Review of techniques and methods used on site assessment.

•       Providing expert testimony and/or contributing to the validity and authenticity of data used in cost recovery
        cases.
                                                  53

-------
SUMMARY OF SUPERFUND SHORT TERM REQUESTS
REGION/
STATE
8
7
6
GSA
1
USGS
8
4
Nevada
USAGE
1
7
5
ORD
California
9
9
9
USAGE
4
USAGE
9
4
Virginia
OERR
DATE
January
February
March
March
March
February
March
February
February
February
March
March
February
January
February
February
February
March
March
February
February
February
March
March
January
SITE
Eureka Mills
Big River


Pine Street

Big River

Brownfields
UXO
Savage Well
Big River

Leviatan

Aerojet
MGM Brakes
MGM Brakes



Alark
Roanoke River
UST's

REQUESTOR
M. Goldade
B. Morrison
P. Lodee
T. Martin
S. Mangion
P. Buzoka
J. Drexler
K. Knight
C. Terratauk
D. Brooks
D. Willey
B. Morrison
G. Jones
D. Reisman
S. Kumar
K. Mayer
S. Remaley
A. Wayne
J. Wakeman
J. Felton
D. Daniel
D. Stensby
B. Walden
J. Barnett
S. Frey
TELEPHONE
NUMBER
(303)312-7024
(913)551-7755
(512)239-6688
(702) 270-7722
(617)918-1452
(317)290-3338

(404) 562-8885
(702) 242-4200
(816)983-3514
(617)918-1266
(913) 551-7755
(312)886-1423
(513)407-2533
(510)540-2219
(415)972-3176
(415) 972-3802
(415)947-4510
(206) 764-3706
(408) 436-1716
(816)983-3910
(415) 972-3246
(404) 562-8814

(703)603-8817
NATURE OF
REQUEST
XRF
Air Modeling
Air Sampling
IAG
Sampling
Flowmeters
Lead Analysis
Mercury Analysis
Sites
Characterization
Sampling
Lead Analysis
Tech Suypport
Tech Support
Sampling
Perchlorate
Data Audit
Data Audit
ProUCL
Bio Remediation
ProUCL
Geophysics
TIC's
ProUCL
Tech Support
                  54

-------
3
9
3
7
1
Texas
3
2
Nevada
ORD
2
ERT
CA
9
9
9
1
9
INEEL
1
INEEL
3
7
2
3
4
5
INEEL
USAGE
January
January
February
January
January
January
February
March
February
January
January
January
February
February
January
January
January
February
February
February
March
February
February
January
February
February
February
March
February

Sierra Army
UST Vapor
Eagle Either
S. Weymouth

Chem-Solve
Reich Farms

Leviatan
SGI Dump

Alark

Sierra Army

ORIA
MGM Brakes
Ft. Sheridan
S. Weymouth
Distler Brickyard
Sharon Steel
Big River
Reich Farms

Roanoke River
Pristine
Alark

B. Rundel
K. Wong
J. Huang
S. Doolan
P. Whittemore
C. Spiegelman
D. Rossi
M. Olsen
J. Mary
D. Reisman
E. Keveney
J. Camancho
D. Stensby
D. Willey
M. Gill
D. Yeskis
S. Mangion
S. Remaley
J. Sondrup
P. Whitemore
K. Sorenson
J. Hubbard
B. Morrison
J. Josephs
R. Landy
S. Thorns
R. Boice
C. Scott
W. Mandel
(215)814-3319
(415) 972-3039
(215)814-3386
(913)551-7919
(617)918-1382
(979) 845=8817
(215) 814-3228
(212)637-4313
(702) 807-4456
(513)487-2578
(212) 637-3916
(732)906-6916
(415) 972-3246
(617) 918-1266
(415) 972-3054
(312) 886-0408
(617) 918-1452
(415) 972-3802
(208) 526-8396
(617)918-1382
(208) 528-8718
(215) 814-3328
(913(551-7755
(212)637-4317
(410) 305-2757
(404) 562-8666
(312)886-4740
(208) 526-2919
(410)436-1518
Support
Support
Data Assessment
Air Modeling
Data Assessment
ProUCL
Data Assessment
Data Assessment
Tech Support
Tech Support
Geostatistics
Tech Support
Tech Support
Tech Support
Tech Support
Data Assessment
Tech Support
Data Audit
Data Assessment
Data Assessment
Sampling
ProUCL
Modeling
Tech Support
Tech Support
TIC's
Tech Support
Geophysics

55

-------
ORD
10
10
TIO
10
February
February
February
January
February

Adak



B. Mournighan
K. Dates
N. Thompson
K. Yaeger
J. Barich
(913) 557-7913

(206) 553-7979
(732) 906-6916
(206) 553-8562
Tech Support
UXO
Meeting
Sampling
Meeting
             SUPERFUND REMOTE SENSING SHORT TERM REQUESTS

Project Name: Remote Sensing
Site: Superfund Short Term Remote Sensing Technical Support
Site ID:

Type Lead:
Requested by: See below
Lead Scientist: TSC Staff Scientists

Start Date: October 2001
Expected Completion Date: September 2002
Revised Completion Date:
Estimated Budget: $5,000
Revised Budget: $
Major Contaminants:
Total Expenditures:$300
Total FY02 Expenditures:$300
Total 2nd Qtr. Expenditures:$300
TSC Remote Sensing requests that can be completed within a 60 hour period. The ESD TSC is requested
to provide Remote Sensing support that requires a quick-turn-around-tirne. Projects that may be addressed
within this 60 hour time frame include:

•       The use of Geographic Information Systems (GIS) for site characterization.

•       Providing plots of geostatistical related data for site characterization.

•       Review of RI/FS reports and work plans, pertaining to the use of multi-spectral scanner, remote
        sensing and GIS technologies.

•       Review of identification and technological techniques and methods used in remote sensing site
        assessment.

•       Providing expert testimony, coordinating and/or contributing to the validity and authenticity of
        "remote sensing" data used in cost recovery cases.
                                         56

-------
REGION
ORD
ORD
2
9
ORD
DATE
January
February
February
February
February
SITE
Asarco El Paso
Leviatan
Rt. 561 Dump

Iowa Army
REQUESTOR
P. Arberg
D. Reisman
E. Keveney
M. Gill
B. Mournighan
TELEPHONE
NUMBER
(702) 798-2545
(513)487-2533
(212) 637-3916
(415)972-3054
(913)551-7913
NATURE OF
REQUEST
Aerial Photos
Aerial Photos
Aerial Photos
Aerial Photos
Aerial Photos
ISSUE PAPER/ISSUES
ISSUES
        Project Name: Exide
        Site: General Battery Corporation
        Site ID:

        Type Lead:
        Requested by: Khai Dao (215) 814-5467
        Lead Scientist: A. K. Singh (702) 895-1439

        Start Date: February 2001
        Expected Completion Date: July 2001
        Revised Completion Date: April 2002

        Estimated Budget: $8,000
        Revised Budget: $
        Major Contaminants: Lead
Total Expenditures:$6,700
Total FY02 Expenditures^ 1,600
Total 2nd Qtr. Expenditures: $600
        The Project Officer requested that the ESD-LV TSC provide assistance in reviewing the proposed
        approach that is being suggested to "Krig" soil lead concentrations.

        Exide operates a secondary lead smelter and batter manufacturing/distribution facility in Berks County,
        Pennsylvania. Since 1991, several studies have been performed on soil, sediment and groundwater in areas
        adjacent to and in the vicinity of the facility to investigate the occurrence of lead, arsenic, selenium and
        cadmium that may be attributable to past facility operations. The Study Area covers approximately a one-
        square mile area centered around the facility. The Study Area includes portions of Laureldale Borough and
        Muhlenburg Township, Berks County, Pennsylvania, and is situated less that one mile north of the City of
        Reading. The investigations conducted to date in the Study Area include the following:

        •        Soil sampling performed during  1992 (now referred to as Phase I investigation);
        •        Soil sampling performed between completion of Phase I investigation and July 2, 1993,
                designated as the Phase II investigation;
        •        Soil, sediment and groundwater sampling performed under the Phase III investigation in 1994:
                and,
        •        The Phase IV soil and sediment sampling (1996).
                                                 57

-------
Following a review of the geostatistical issues, the TSC provided some comments and suggestions for the
improvement of the suggested approaches.  In June the TSC received the document titled "Summary of the
Supplemental Geostatistical Analysis" for review. The Review was completed with comments and
suggestions provided to the Region. The Regional Project Officer provided site data for kriging.
Following a geostatistical assessment the report titled "Kriging of Lead Concentrations in Soils at Exide
Superfund Site." Additional support is anticipated.

Project Name:Estimation of the Exposure Point Concentration Term Using a Gamma Distribution
Site:
Site ID:

Type Lead:
Requested by: TSC
Lead Scientist: A. K. Singh (702) 895-1439, Anita Singh (702) 8973234

Start Date: March 2002
Expected Completion Date: July 2002
Revised Completion Date:

Estimated Budget: $4,000                                Total Expenses:$ 100
Revised Budget: $                                       Total FY02 Expenses:$ 100
Major Contaminants: Organics/Inorganics                  Total 2nd Qtr. Expenses:$ 100

The ESD-LV TSC provides assistance in assessing site data for characterizing contaminants and for
providing Regional Risk Assessors with appropriate data to complete ecological and human risk
assessments.

The TSC identified a need to provide federal, state, and private environmental scientists working on
hazardous waste sites with a technical issue paper that identifies data assessment techniques that can be
implemented to better define and identify the distribution of hazardous waste site contaminants. The
examples used in this issue paper and the recommendation provided were the result of numerous data
assessment approached performed by the TSC at hazardous waste sites.

In Superfund and RCRA projects of the U.S. EPA, cleanup, exposure, and risk assessments decisions are
often made based upon the mean concentrations of the contaminants of potential concern.  A 95% upper
confidence limit (UCL) of the population mean is used to estimate the exposure point concentration (EPC)
term, to determine the attainment of cleanup standards, to estimate background level contaminant
concentrations, or to compare the soil concentrations with the site specific soil screening levels. It is,
therefore, important to compute an accurate and stable 95% UCL of the population mean from the
available data.

This issue paper is currently being peer reviewed.

Project Name: MARSSIM
Site: Multi-Agency Radiation Survey and Site Investigation Manual
Site ID:

Type Lead:
Requested by: Colleen Petullo (702) 798-2446
Lead Scientist: Larry Hull (208) 526-1922
                                          58

-------
Start Date: January 2002
Expected Completion Date: September 2002
Revised Completion Date:

Estimated Budget:$$25,000                                      Total Expenses:$2,250
Revised Budget:$                                              Total FY02 Expenses:$2,250
Major Contaminants: Radiation                                  Total 2nd Quarter Exps:$2,250

The ORIA Project Officer requested that the ESD-LV provide assistance in supporting the development of
sampling/monitoring approach for radiologically contaminated sites.  ORIA has provided all $ resources
for this project.

The Multi-Agency Radiation Survey and Site Investigation Manual (MARSSIM) Workgroup has been
meeting since January 1994 with the objective of developing principles and processes for conducting final
site closure surveys at radiologically contaminated sites. The agencies involved are the Department of
Defense, Nuclear Regulatory Commission, Environmental Protection Agency, and the Department of
Energy. The MARSSIM was published in 1997, and is a consensus guidance manual for conducting
Superfund and non-Superfund characterization, final status, and/or cleanup verification radiation surveys
of surface soils (not more than 6 in. deep) and building surfaces. Having completed the surface soil
manual, the MARSSIM Workgroup is expending their scope to add two supplements. The supplements
will address 1) surveying contaminated materials and equipment for free release, and 2) cleanup
verification surveys of the subsurface. NRC is taking the lead on the supplement for materials and
equipment. The subsurface supplement is currently titled Multi-Agency Radiation Survey and Assessment
of Subsurface Soils (MARSASS).

The INEEL will provide Subject Matter Experts (SMEs) in the area of monitoring, sampling and surveying
of radioactive contaminants in subsurface soils (>6 in. beneath the surface).  These SMEs will assist EPA
(and the other MARSASS signatory agencies) in developing new state-of-the-science subsurface
contamination characterization and cleanup methodologies. A number of meetings were attended by the
lead scientist.

Project Name: UST Vapor Monitoring
Site:  UST Vapor Monitoring Guidance Document
Site ID:

Type Lead:
Requested by: Jack Hwang (215) 814-3386
Lead Scientist: A. K. Singh (702) 895-0364

Start Date:
Expected Completion Date: August 2001
Revised Completion Date: April 2002

Estimated Budget:$6,000                                 Total Expenditures:$804
Revised Budget:$                                       Total FY02 Expenditures:$804
Major Contaminants: Organics                            Total 2nd Qtr. Expenditures:$400

The Regional Project Officer requested that the ESD-LV TSC provide assistance in reviewing and
evaluating the data assessment and statistical methods/procedures that are being utilized in the UST
guidance document
                                          59

-------
Regional inspectors evaluated vapor concentration data from vapor monitoring wells and brought up the
issue of how should environmental scientists determine what constitutes a "significant" increase in vapor
concentration at a site. UST Technical Regulations require persons using vapor monitoring will be
effective for the site.  Vapor monitors must be able to detect any significant increase in concentrations
above the background of the regulated substance stored in the tank system.  If no releases occur during the
first year of system operation, the tank/owner/operator may re-calculate the background concentration for
each well by using the original background data and the monthly monitoring data from the previous year.
The UST guidance  document provides and suggests procedures that can be used to assess
background/monitoring well data.

Following a review of the "document" the TSC provided the Region comments and suggestions in the
report titled "Review of Recommendations for Establishing Background Consent." The TSC received
contaminant data from wells 3, 6, 7A and 11 for calculating the 95% UCL.  The TSC completed a
statistical data assessment and provided the Region with a letter report that identified the formulas and the
calculations for computing the 95% UCL for wells 3, 6, 7A, and 11. Following a review of ProUCL by the
State of Virginia, the TSC received a spread sheet utilizing the Chebychev equation. The TSC is currently
reviewing the spreadsheet.
                                          60

-------
SUPERFUNP COORDINATION

Project Name: Superfund Coordination
Site: Superfund Coordination
Site ID:

Type-Lead:
Requested by: Ken Brown
Lead Scientist: Tim Ehli (702) 897-3264, Ken Moor (208) 526-8810

Start Date: October 2001
Expected Completion Date: September 2002
Revised Completion Date:

Estimated Budget: $25,000                              Total Expenditures:$3,906
Revised Budget: $                                      Total FY02 Expenditures:$3,906
Major Contaminants: N/A                               Total 2nd Qtr. Expenditures^ 1,209

This project provides for Superfund coordination and management of requests received by the Technology
Support Center and implemented when assigned to the off-site contractor. Activities include preparation of
reports, tracking of projects, and documenting costs.
                                        61

-------
                             TECHNOLOGY TRANSFER
Project Name:  Superfund Technology Transfer
Site: Superfund Technology Transfer
Site ID:

Type-Lead:
Requested by: Director TSC
Lead Scientist: Ken Moor (208) 526-8810, Tim Ehli (702) 897-3264

Start Date: October 2001
Expected Completion Date: September 2002
Revised Completion Date:

Estimated Budget: $35,000                               Total Expenditures:$3,300
Revised Budget: $                                       Total FY02 Expenditures:3,300$
Major Contaminants:                                    Total 2nd Qtr. Expendituies:$l,500

One of the objectives of the TSC is to identify and make available ESD measurement technologies that are
applicable for characterizing contaminants.  Documenting the adequacy of these technologies, the
application and their identity requires the development of case studies, fact sheets, demonstrations and
workshops. All ESD fact sheets have been updated.

The Superfund Program Office requested that the ESD-LV TSC provide information and documentation
pertaining to the operation and utilization of a vacuum distillation/gas chromatography/mass spectrometry
instrument. The purpose of this effort is to adequately describe this instrument and provide written
guidance that will enable Regional chemists to measure hazardous waste contaminants. The following
information shall be addressed in this SOP.

General introduction: including brief overviews of the concepts of and needs for vacuum extraction, gas
chromatography, and mass spectrometry.

Instrumentation: including sources of all instrument parts, suggestions about equipment parts (if
appropriate), reagent sources (including gases), and glassware.

Operating parameters: including step by step directions on installation and use.

Data processing: to include a description of the software currently being completed for use in a Windows
NT environment and including use of spread sheet(s) for surrogate-matrices corrections.

Trouble shooting: including what-to-do section for predictable problems such as vacuum leaks,
contamination, and instrument down time.
                                          62

-------

-------