FACILITATOR'S MANUAL FOR
PRINCIPLES OF ENVIRONMENTAL
IMPACT ASSESSMENT REVIEW

July 1998

U.S. Environmental Protection Agency
Office of Federal Activities MC-2251-A
401 M Street, Southwest
Washington, D.C. 20460

-------

-------
Principles of Environmental Impact Assessment Review
                               ACKNOWLEDGMENTS

       This Facilitator's Manual, stand-alone text "Principles of Environmental Impact
Assessment Review", and the associated Resource Manual constitute the materials for the
international training course: "Principles of Environmental Impact Assessment Review". We
would like to acknowledge the many individuals who contributed to the evolution and unique
focus of this material.

       First, we would like to acknowledge government officials in Mexico and Brazil who
identified the need for further training to complement USEPA's first international course on "The
Principles of Environmental Impact Assessment." They motivated the development of a sequel
course by USEP A which in working with them has evolved from a potential course on "tools and
techniques of environmental impact assessment" to its present form offering a unique perspective
and previously unmet need to address "reviewers" of environmental impact assessment.  The
comments of Mexican officials who participated in a pilot in Monterey, Mexico in September of
1996 helped to further direct the course to utilize actual environmental impact assessments as the
basis for the course and to enhance the technical content of the material.  The course will continue
to be enriched over time as we strive together to best meet the needs of colleagues around the
globe.

       We want to particularly acknowledge the contributions of Hector Pena of USEP A Region
VI and Ed Yates, then of Region IX who facilitated the first pilot delivery in Monterey Mexico
along with Mexican colleagues and who made key suggestions for improving the course. John
Gerba and Arthur Totten in the Headquarters Office of Federal Activities served as project
managers for this first phase of the course's development.  Early work was funded by US AID
through Pat Koshel and Cam Hill Macon of USEPA's Office of International Activities.

       Second, we acknowledge the team of experienced USEPA reviewers who spent many
hours identifying the approaches they took to the job of the "reviewer," identifying what might be
good "case studies", and serving as "guinea pigs" for two successive pilots of further course
developments.  Special thanks to the insightful comments of Patience Whitten, Tim Timmermann
of Region I; Marie Jenet of Region II; Francesca di Cosmo, Danielle Algazi, and Regina Poeske
of Region III; John Hamilton and Ernesto Perez of Region IV; Mike MacMullen and Chris
Christienson of Region V; Hector Pena of Region VI; Dewayne Knott and Cathie Tortorici  of
Region VII; David Schaller, Cindy Cody, Steve Moores, Alicia Aalto, and Wes Wilson of Region
VIII; David Mowday of Region IX; Joan Cabreza, Wayne Elson, and Rene Fuentes of Region X;
Anne Miller, Deputy Director of Headquarters Office of Federal Activities (OF A), Jim Serfis, of
the NEPA Compliance Division in OFA for his constructive suggestions on categorization of
biological resources, Cheryl Wasserman Associate Director, Headquarters OFA; and Gene
Kersey, formerly of EPA Region VIII and now of the U.S. Department of Agriculture.

-------
Principles of Environmental Impact Assessment Review
       A note of thanks to Steven Moores whose imaginative illustrations during the August
1997 pilot inspired the use of logos for the "roadmaps" and "tools and techniques" guides
throughout the course, to Gene Kersey for providing the electronic versions of the logos and to
Ron Slotkin who helped develop the electronic version of my rendition of a road map to embellish
a packaged "logo" for use in the course. Many thanks also to Ron Slotkin who helped develop
the final graphic depiction of the EIA process flowchart out of my early prototypes.

       Third, a special note of thanks to Arthur Totten who put together the accompanying
Resource Manual based upon the USEPA Sourcebook for  environmental impact assessment and
various USEPA and World Bank guidance documents. The Sourcebook, prepared in 1993, was
the result of a contract between the EPA Office of Federal  Activities and Oak Ridge National
Laboratory's Environmental Sciences Division. Its development was overseen by a panel of
worldwide experts representing most aspects of environmental assessment. It contains a
compilation of articles and collective experience in the preparation of environmental impact
assessments.

       The interactive CD-ROM which is disseminated to  participants as part of this training
builds on the sourcebook materials and original "Principles of Environmental Impact Assessment
training course." It was put together by a team from US EPA Region  V and Purdue University
using an actual case example in Alaska to bring the materials to life.  We acknowledge this
important contribution by Dale Luecht, Robert Beltrain, Mike Bland and Alfred Krausse of
USEPA Region V.

       The "Principles of Environmental Impact Assessment Review"  text, Resource Manual and
Facilitator's Manual for the associated training course was  developed under the technical
direction and co-authorship of Cheryl Wasserman, Associate Director for Policy Analysis in
USEPA's Office of Federal Activities, Office of Enforcement and Compliance Assurance with the
assistance of Science Applications International Corporation (SAIC) Project Manager Kathleen
Harrigan along with Kenneth Pruitt, Gregg Mallon, Takisha Cannon under contract number 68-
W7-0050 and technical materials developed by Susan Moore, Andrew Warner, and Kellie DuBay
of SAIC under prior contract, 68-W2-0026.

       Finally, I would like to acknowledge the commitment of William Dickerson, Director of
the Office of NEPA Compliance Division for continued support for the course development as
testament to our commitment to those who have environmental impact assessment review jobs
both within the United States and around the world.
                           Cheryl Wasserman
                           USEPA, Manager for Domestic and International Capacity Building
                           in Environmental Impact Assessment
                                          u

-------
             Principles of Environmental Impact Assessment Review
  i
o
                                 IMPORTANT BACKGROUND INFORMATION
The Principles of Environmental Impact Assessment Review training course is
intended for independent reviewers within government and economic development
institutions responsible for conducting environmental impact assessment reviews
and using the results of the process to enhance decision making.

This course is not specialized instruction in techniques of impact assessment,
analysis or evaluation for scientists, engineers, economists and/or planners.

The course has been designed to be taught in a facilitated style and draws heavily
on group participation.

This Facilitator's Manual is a guide for presenting the Principles of Environmental
Impact Assessment Review training course. It contains the key points and general
instructions for facilitating the course. It presents step-by-step instructions for
conducting the course along with scripted text. It is assumed that the facilitators
are experienced with facilitation techniques.

This Facilitator's Manual is designed for instructors who have both a thorough
understanding of environmental impact assessment process, environmental impact
assessment review, and prior experience in facilitated training.

Facilitators need significant preparation in advance of the course.

Facilitators should be very familiar with the course, "The Principles of
Environmental Impact Assessment Review" and the companion student text prior
to presenting the "Principles of Environmental Impact Assessment Review."

Facilitators should have attended the training course as a participant prior to
presenting the course.

The delivery of the course is greatly enhanced when the facilitators have conducted
a full, four-day practice session.

Considerable effort must be expended on logistics in order to present the course in
a professional manner. These logistics may include document copying, flipchart
preparation from 8'/2 x 11 inch originals, translation, and procurement of a training
site, among others.

                              iii

-------
Principles of Environmental Impact Assessment Review
                                     IV

-------
Principles of Environmental Impact Assessment Review
                    Principles of Environmental Impact Assessment
                                   Training Course
                                 Facilitator's Manual

                               TABLE OF CONTENTS
                                                                              Page
Acknowledgments	i
Important Background Information	iii
Table of Contents	v
Introduction to the Training Course	1

             Description of the Course	1
             Instructions and Tips for the Facilitators	3
             Instructions for the Recorders	8
             Course Planning Materials 	9
             Country-Specific  Tailoring	9
             Material for Course  	9
             Checklist for Planning, Conducting and Completing Training 	11
             Course Materials  Matrix	15
             Example Facilitator Schedule/Facilitator's Schedule Template 	18
             Course Agenda	!... 20

Session 1     Welcome and Introduction	1-1
Session 2     Reviewer's Role in the Environmental Impact Assessment Process	2-1
Session 3     Review Approach to Overall Environmental Impact Assessment Document
             and Scoping	;.. 3-1
Session 4     Review of Purpose and Need and Alternatives  	4-1
Session 5     Review of the Description of the Environmental Setting	5-1
Session 6     Review of Potential Environmental Impacts  	6-1
Session 7     Review of Proposed Mitigation 	7-1
Session 8A   Introduction to Preparing and Communicating Reviewer Comments
             on a Draft Environmental Impact Assessment	8-1
Session 8B    Preparation and Communication of Reviewer Comments on a Draft
             Environmental Impact Assessment	9-1
Session 9     Review of a Final Environmental Impact Assessment for
             Response to Comments  	9-1
Session 10    Preparation of a Record of Decision and Mitigation Plan  	  10-1
Session 11    Resources for a Reviewer	  11-1

-------
Principles of Environmental Impact Assessment Review
Session 12    Country-Specific Applications  	12-1
             Wrap-Up and Course Evaluation  	  13-1

Appendix A:  Case Study Information
             •      Selecting a Case Study
             •      Case Study Summary Format
             •      Case Study Summaries:  Course materials include at least four case write-ups,
                    but facilitation materials may be substituted or added for alternative cases.

Appendix B:  Flipcharts

Appendix C:  Handouts
I
                                          VI

-------
Principles of Environmental Impact Assessment Review
                    INTRODUCTION TO THE TRAINING COURSE
DESCRIPTION OF THE COURSE

This training course has been developed to instruct participants in the principles of environmental
impact assessment review.  The Facilitator's Manual should be used in conjunction with the
student text entitled "Principles of Environmental Impact Assessment Review" and the Resource
Manual.  The Resource Manual is outlined in Appendix D of the Student Text.  The course
provides participants with an approach for effectively reviewing environmental impact
assessments and becoming involved in the environmental impact assessment process. As such, the
target audience of the course consists of government and other official reviewers of environmental
impact assessments who have a good understanding of basic scientific concepts and an awareness
of environmental issues. The course is not designed to offer specialized instruction in techniques
of impact assessment, analysis, or evaluation for scientists, engineers, and planners. For those
participants who desire to learn more after taking this course, Appendix D (Contents of Specific
Environmental Impact Assessment Tools) of the "Principles of Environmental Impact Assessment
Review"  text contains references to textbooks and publications covering in greater detail the
topics discussed in the training.

The course is taught in the facilitated style to promote participation and involvement, which is an
optimal setting for learning. By exploring the environmental impact assessment process with their
colleagues, participants should finish the course with review approaches that they will be able to
draw upon in the nature and a mechanism for training others to review environmental impact
assessments. It also helps to develop a support network among course participants.  The delivery
of the course is most effective when it is taught by people who have been trained in the facilitated
teaching  style and who have knowledge of the environmental impact assessment process and who
have actually served in positions as reviewers of environmental impact assessments.

Case Studies

In addition to using the facilitated style, this course also uses four real environmental impact
assessments. The four environmental impact assessment case studies are chosen to expose the
participants to a range of situations that they may encounter during environmental impact
assessment reviews. The participants may also find the course to be more stimulating when they
are given a variety of concerns and impacts to work with.  The documents should be chosen to be
examples of a range of projects.  Several U.S. case studies were selected for the training. Draft
and final environmental impact assessment documents, and all other course materials, are
prepared  and presented in English. The course has been designed to give facilitators and host
countries the option of replacing up to three of the four environmental impact assessments with
local documents written in the language of their choosing (see Appendix A — Selecting a Case
Study).

-------
Principles of Environmental Impact Assessment Review
Exercises

Throughout the course the purpose of each exercise is summarized as it is introduced to
participants.  These purposes highlight many of the key concepts the facilitator should cover. At
the beginning of each exercise, a time breakdown is provided.  Facilitators should note the
approximate time for each portion of the schedule and stay within the allotted time.

References to the flipcharts and handouts that should be used are located before the scripted text
in which they are discussed.  Both prepared and blank flipcharts are used in this course. Blank
flipcharts should be filled in by a recorder who will write down the participants' responses.  Other
flipcharts will be prepared beforehand with all of the necessary reference information that the
Facilitator will present to the participants.

Throughout each session, Facilitators pose questions to the group, and the group's responses
usually are recorded on a flipchart. Facilitators should be careful not to lead the group into
making exhaustive lists. Instead, keep the lists directed on major points and bring the discussion
to a timely close.  Do not let discussions become side tracked. Once the list is sufficiently
complete, wrap up the discussion by connecting the group's responses to the subject of the
exercise. Make sure that participants give correct responses to the question. Facilitators should
use established facilitation techniques to ensure that the correct response is understood, for
example, by soliciting a different response and probing why the respondent would offer a different
response, and indicating that in practice the latter response is thought to be correct.

Small Groups

The course is designed to be taught to between 16 and 20 participants. For many exercises,
Facilitators will arrange the participants into two or four small groups.  Facilitators may also wish
to assign each group a different color and provide the group with that color magic marker to use
to record its responses on a blank flipchart. The breakout group matrix, in the course planning
materials section, presents an option for breaking the participants into groups.

The Student Text   '

The Student Text,  "Principles of Environmental Impact Assessment Review,"  which accompanies
this course, contains information and materials that will be discussed during the course. It is the
responsibility of facilitators to have the Student Text prior to course delivery and to encourage
participants to read the text. Facilitators may also highlight certain topics in the text during the
exercise. Advise the participants that they can take notes, when covering the appropriate
subjects, in the blank column space in the Student Text.

-------
Principles of Environmental Impact Assessment Review
Finally, Facilitators should emphasize to participants that there is a greater amount of information
on environmental impact assessment in the Student Text and also is covered in the exercises, and
that they should take advantage of the Student Text to discover this information.

INSTRUCTIONS AND TIPS FOR THE FACILITATORS

Advance Preparation

It is important to spend sufficient time reviewing all of the material and become comfortable with
it prior to delivering this course.  The time required for this advance preparation will vary
depending upon the experience of the facilitator and the country-specific tailoring that is required.

In order to facilitate this training course, you should have previously attended this course as a
participant and you should be familiar with the text, "Principles of Environmental Impact
Assessment Review." You should expect to spend about 40 hours preparing for delivery of this
course. A practice session should be held with the facilitation team so that the course can run
smoothly and so that everyone understands the sessions they are facilitating.  You should also be
familiar with the facilitated teaching style. It is recommended that a practice run of the course be
given in the month prior to the actual course.

Facilitating the Course

The logistics of the training are important. Pay careful attention to the room setup, especially the
arrangement of chairs, or desks or tables for the participants. It should be "U" shaped with space
or nearby space for four breakout rooms.  The training schedule should be adjusted as required to
reflect the host country's typical daily schedule. During the practice run, designate responsibilities
for tasks such as recording and taping flipcharts up on walls. Identify techniques for dividing the
group and handling reports from the small work groups.

You should know the answers  to the questions you will ask  during the exercises. In most cases,
possible responses are given in the Facilitator's Manual.

This manual has been developed to provide direction to the facilitator for introducing and
explaining the course. It also ensures the course is replicable and consistent as it is delivered
around the world.  Nevertheless, each delivery is unique by virtue of the contributions by the
participants and facilitators. The facilitators must be prepared to be excellent listeners and
responsive to participants comments: The manual is arranged chronologically, beginning with
pertinent information for the Facilitator.  The remainder of the manual is divided into each day's
activities. Copies of the flipcharts and handouts are included in Appendices B and C of this
manual.  At the beginning of each exercise, there is a listing of the flipcharts and handouts that
will be needed.  The course evaluation form is included in Appendix C.

-------
Principles of Environmental Impact Assessment Review
Please note: the script for facilitators is in italics, while general instructions or directions to
facilitators are printed in BLOCK LETTERS.

The Facilitators

This course is designed to be taught by a team of Facilitators. Each host country decides how
many Facilitators to use.  Facilitators should have good skills in, and knowledge of, both
facilitated training concepts and the subject matter they are teaching.

It is highly recommended that the Facilitators spend at least a half day together on site and in
advance of the course working out last minute logistics, arranging the seating in the training
room, and preparing for the exercises. It is important that the Facilitators work as a team and
communicate decisions well. In addition, it is recommended that a Facilitator wrap-up session be
held at the end of each day to review the progress of the course and to make any adjustments
necessary.

To ensure the success of the training course, do not allow the enthusiasm of the participants to
ebb. Maintain their interest in the exercises, especially at the beginning of Day Three. Also,
request that the participants be prompt when reconvening at the beginning of each day, after
breaks and after lunch.

Lead Facilitator

One of the Facilitators should be designated as the lead facilitator. His or her responsibilities will
include scheduling which Facilitator will teach each exercise, opening the course,  and closing the
course. The Lead Facilitator is also responsible for resolving any logistic or procedural problems
that may arise.  Facilitators should teach subjects that they are most familiar with.  In addition,
Facilitators and Recorders should trade places periodically, preferably after each exercise.  A
completed Facilitators* schedule has been included in the course planning section  of the
introduction to assist the lead Facilitator in scheduling.

Facilitated Training

As noted previously, facilitated training is founded on the belief that education is best done by
participation and involvement.  Facilitators should  not preach or dictate an answer, but encourage
participants to think about how they would approach the problem by asking questions and
stimulating discussion. Responses to the questions are recorded by the Recorder  on flipcharts.

The Facilitator should also emphasize that the exercises are hypothetical and drawn from a
combination of real world situations. The purpose is not to mirror reality perfectly but to  provide
a basis for learning about environmental impact assessment, management, and communication.
Participants should not try to guess the "right" outcome of the decision.  Many times, there is no

-------
Principles of Environmental Impact Assessment Review
right answer to a group role-playing exercise. The Facilitator should refer often to the
environmental impact assessment flowchart, which is posted on the wall during Session 2, to
provide participants with a sense of where the exercises or concepts being discussed are located in
the process. In addition, the Facilitator should frequently refer to the project maps to illustrate
spatial relationships and emphasize the linkage between projects.

The role of the Facilitator is to clarify, but also to challenge the group if necessary. Facilitators
may find themselves on different sides of the issues from moment to moment.  Part of the
Facilitator's job is to stimulate discussion, raise ideas, and take the role of the less accepted view.
You, as Facilitator, should also emphasize to the participants that they should have some fun with
the problem!

In facilitated teaching, it is essential that Recorders and Facilitators work as a team.  Facilitators
and Recorders should be paired each day so that they can prepare together for their sessions.
Pairing should also be done on the basis of knowledge of environmental impact assessment (i.e.,
more knowledgeable with less knowledgeable).  Instructions for the Recorder follow this section.

Group Dynamics

It is assumed that Facilitators who present this course are experienced with a number of
facilitating techniques.  Instructions on how to facilitate are not included in this manual.

The Facilitator must try to foster full participation by each member of the class.  To accomplish
this, the Facilitator needs to create a welcoming environment where all of the participants feel
comfortable in participating in discussions. Facilitators may have to segregate dominant and shy
participants by adjusting seating arrangements. A Facilitator's body language can also be an
effective tool in silencing an overly talkative participant or drawing out ideas from a reluctant
participant.
                                                                            i

When dividing the group into the smaller work groups, Facilitators may elect to put the shyest
participants in one group. This will encourage them to participate and create a more comfortable
environment. Facilitators should also require a different spokesperson to report to the group each
time it is required. Facilitators should be creative in dealing with the group dynamics and should
feel free to use a variety of means to involve all of the participants in discussion.

The "Parking Lot" may also be an effective means for extracting questions from reluctant
participants. Write the title "Parking Lot" on a blank flipchart and post it in the back of the room.
Tell the participants to write down questions they might not have felt comfortable asking or did
not have time to ask during the class sessions. Ask the participants to write down their name next
to the question, but only if they want a direct answer. At the end of the course, Facilitators
should respond to the questions posed on the Parking Lot.

-------
Principles of Environmental Impact Assessment Review
Questions on Facilitated Training

What is the difference between lecturing and facilitating?

       •      A lecturer knows all and conveys all by speaking at a group of students who are to
              listen, take notes and learn.  A facilitator is there to help the group discover the
              material themselves, by asking questions, validating and eliciting responses,
              creating dialogue and creating the experiences participants need to learn.  A
              facilitator plays a content role by quickly understanding, and ensuring the group
              understands the points being made, being able to distinguish nuance, size up group
              dynamics and make needed interventions to ensure a safe and respectful learning
              environment.  Good facilitators can cover a lot of material by asking the right
              questions, challenging responses and not the participants, and thinking on their
              feet. Key facilitator techniques include:  1) use of reflective questions, for example:
              What do you think? after a question is directed to them; 2) inviting others to
              respond to a question; 3) brainstorming in which all ideas are welcome and put up
              on a flipchart — discussion is delayed as is evaluation until the ideas are generated.
              Experienced facilitators avoid judgmental and evaluative comments on participant
              contributions to discussion so as not to shut someone off from further
              contributions. A good facilitator will use all contributions to make the necessary
              points.

How Can I Increase My Confidence?

       •      Prepare for the course by reading the Facilitator's Manual - make notes in the
              margins or highlight important points. Practice in front of your co-workers and
              with your facilitation team. Use humor to become more at ease with the
              participants — humor in the form of a humorous story is preferable to a joke.
              Prepare so that it is unnecessary to read  the scripted text which is designed to aid
              in preparation and not to be read.

Technical Tips For Working With Flipcharts

       •      Set the flipcharts in advance. Make sure that they are in order. In particular,
              make sure that there are blank flip charts behind flip charts that ink may
              "bleed" (soak) through to protect them from being ruined. Make sure you are
              not standing between participants and the flipchart. Face the group as you speak,
              and keep the group's attention focused by pointing at the specific items that you
              are referring to.

-------
Principles of Environmental Impact Assessment Review
What If the Group Asks a Question I Cannot Answer?

       •       Refer the question back to the group.  Ask them their opinion or ask if anyone else
              knows the answer.  Or, write the question down and find out the answer at the end
              of the day.  Don't be afraid to admit you just do not know!  Also, the question can
              be put on the "Parking Lot" and answered at the end of the class. This gives the
              facilitators some time to research an answer with the other facilitators.

What if the Group Asks a Question That Willbe Answered in a Future Exercise?

       •       Let the group know that you will be getting to that and that it would be preferable
              to hold the question until then.  Ask the group to repeat the question after the
              appropriate exercise or at the end of the day if it still has not been answered.
              Perhaps point out the question at the appropriate time and ask the group to answer
              it then.

What Are the Basic Classroom Principles?

       •       Focus on the situation, issue, or behavior, not the person. Maintain the  self
              confidence and self esteem of each participant.  Maintain good relationships with
              all participants.  Take the initiative to make things a little better including room
              temperature, seating, group assignments, bringing out shy people, and quieting
              noisy people so everyone participates.

Hew Do I Promote Learning?

       •       Get participants involved in achieving the course objectives; remember, learning is
              a student-centered activity. Draw out the participants and discussion. Be
              enthusiastic about promoting learning in the time allotted regardless of the subject.
              Seek feedback and use it to judge whether the participants are learning.  As a
              facilitator, take the time to learn the difference between good and bad instructing.

How Do I Overcome Nervousness?
                                         i

       •       Don't focus on yourself.  Focus on the participants learning from each other and
              the message you are trying to convey. Prepare for the training in advance and
              practice with co-workers and friends.  Practice, Practice, Practice.

How Can 1 Handle Divergent Topics?

       •       At times, group discussions may stray from the course. It is up to the facilitator to
              determine if pursuing such.a topic will benefit the group. If so, feel free to  record

-------
Principles of Environmental Impact Assessment Review
              the group's responses on a blank flipchart. If not, exert leadership to politely get
              them back on track.

 What Are the Characteristics of a Good Style of Delivery?

       *      Project your voice so that everyone can hear; speak to the back of the room.  Time
              your remarks so that the pace is neither too slow nor fast.  Maintain eye contact
              with the group by looking at different people. Use gestures to animate the
              discussion.
 What Do I Say to an Arguer?

       •      Try to find out what this person wants or what his motive is for arguing. Ask the
              arguer if there is anything you, the facilitator, can do.

How Can I Win Over a Hostile Group?

     .  •      Be willing to listen to what the group has to say, and be willing to ask for the
              courtesy of listening to what you have to say afterward. Emphasize things on
              which you and the audience agree. Try to establish a common ground. Rely on
              logic and evidence instead of emotions.

Haw Do I Present Material not in the Native Language of the Participants?

       •      Allow more time for the participants to read materials when they are not in their
              native language. Also, consider asking for a volunteer to present a summary of the
              salient points. Usually, where it is needed, arrangements are made in advance for
              simultaneous interpretation and written materials are translated in advance. Care
              must be taken to ensure a good translation,  but recognize that it is never perfect
              and welcome ideas for improving communications about key concepts and terms.

INSTRUCTIONS FOR THE RECORDERS

Recorder's Role

During each exercise, the Recorder's role is to assist the Facilitator. The primary function of the
Recorder is to write down the group's responses to the questions being asked. Many flipcharts
are used for reference purposes during the exercises, while others have only a title or a few words
on them. The latter are used to lead discussions or pose questions to the group. It is on these
flipcharts that the Recorder should write down the group's responses. A recorder should remain
as close to the spoken words as possible so the group can recognize their  material and not get
distracted trying to correct what a recorder has put down.  It is not necessary to write down a
complete sentence; only key words should be recorded, but recorders should try to use exact

                                           8

-------
Principles of Environmental Impact Assessment Review
words to the extent possible to reinforce and avoid interpreting contributions by participants.  The
Recorder should feel free to ask the participants to repeat themselves, summarize their response,
or speak louder. But the Recorder should avoid distracting the group from following the
Facilitator's lead through the exercise.  The Recorder should not stand directly in front of the
paper when recording responses, but rather to the side so that the participants can see what is
being written.  If more space is needed, a blank flipchart should be used. Feel free to use
abbreviations.  When a flipchart is filled, the Recorder should number the page by session and
number and tape it to the wall.

At times, group discussions may embellish materials in the course exercises. If the Facilitator
wishes to continue those discussions, the Recorder should consider the value of recording these
discussions on a blank flipchart to  record the responses.  By recording responses to questions that
are asked, the group  will feel that the discussion is important and worth contributing to. The
Recorder should keep track of the time for the Facilitator and perform other logistic matters, such
as distributing handouts, markers,  etc.

COURSE PLANNING MATERIALS

The course planning  materials are an aid to assist the facilitators in planning and delivering a
professional course.  Prior to course delivery, facilitators should ensure that all necessary
materials are gathered or prepared. Flipcharts are provided in Appendix B and should be blown
up. Handouts are located in Appendix C and will need to be copied so that there is  one set for
every participant. If materials needed for course delivery are not available for purchase in the
host-country, US facilitators should make arrangements to ship them from the U.S.  A checklist is
included that outlines all of the preparation and follow-up activities necessary for successful
presentation of the course.  A completed Example Facilitator's Schedule is provided for reference.
A blank Facilitator's Schedule is provided for planning.

COUNTY-SPECIFIC TAILORING

Most of the course is applicable to any country, legal, or cultural setting. Specific opportunity is
made for:

       1) substitution of up to 3 of the four course case studies with local examples (including
       substitution of the Supplemental Table of Contents (handout 3-1) for each case study and
       summary of selected public comments for each case study (handout 8-3)

       2) inclusion of country-specific information in the Resource Manual, Section 4 such as
       laws, regulations, cites to relevant guidance

       3) inclusion of summaries for sources of information and expertise within the country
       which provides comparable information to Sections 1.5.4 (Assessment) and  1.5.5 (Sources

-------
Principles of Environmental Impact Assessment Review
       of Environmental Data) in the Resource Manual as well as relevant Internet sites as listed
       in Section 7 of the Manual.

       Section 12 also provides for an entire session devoted to country specific applications with
       provision for key country leaders to speak about EIA processes and policies within the
       country and facilitated discussion of how the subject matter of the course can be adopted
       for use in the country.        .

PRACTICE, PRACTICE, PRACTICE

       Experience delivering this course results in one conclusion: the team needs to practice in
       several ways:  .                   .

       1) Facilitator/recorder teams should rehearse together going over use of flipcharts and
       handouts,  and the "on deck" assignment should also be prepared to back them up for the
       session with posting of flipcharts, remembering handouts if forgotten, and keeping track of
       time.
       2) Transitions from one session to the next need to be rehearsed.
       3) All facilitators should be ready to deliver each session, regardless of assignments, not
       just their own;
       4) Each facilitator must be familiar with the student text, how to reference it, and the main
       points to be made in their sessions so they can take advantage of spontenous participant
       comments to reinforce the learning.
       5) Each facilitator should be prepared to deliver the training in their own personal style but
       as set forth in the manual. This is very important for several reasons: a) the course is
       meant to be replicable, handed-off to other facilitator trainees and they need to be able to
       rely upon and find the course presentation aids in the facilitator's manual...not a one-time
       delivery, b) other facilitators depend upon you since the course builds on itself, and c)
       lastly, it is designed for participant derived insights, not lecture, and ad-libbing tends to
       favor the latter.
       5) Each facilitator must know how to manage the session if they run short of time in a
       manner which ensures the integrity and content of the course is maintained.
                                           10

-------
Principles of Environmental Impact Assessment Review
MATERIALS FOR THE COURSE

Below is a list of the materials that are needed for this training course.

       •      Resource Manual - "Principles of Environmental Impact Assessment Review" - a
              copy for each participant and facilitator
       •      Student Text - "Principles of Environmental Impact Assessment Review" - a copy
              for each participant (Also a text of the Principles of EIA if participants do not
              already have copies is highly recommended)

       •      Facilitator's Manual - "Principles of Environmental Impact Assessment Review" -
              for each facilitator and for those being trained as facilitators for future deliveries

       •      Actual Draft Environmental Impact Assessment Documents for four
              actions/projects, one for each  1/4 of the class
       •      Actual Final Environmental Impact Assessment Documents for four
              action/projects, one for each participant
       •      A large quantity of small Post-It-Notes or any sticky-backed note paper so that
              participants can mark key places in the case studies, Resource Manual, Student
              Text, and elsewhere without making permanent marks with pens
       •      One set of handouts for each participant

       •      One set of large flipcharts with printed information for facilitator/recorder
       •      Five blank flipchart pads for recorder and small groups
       •      Six easels or stands for the flipcharts (two in front of entire group and four for
              small groups)
       •      Enlarged Flow Chart (preferably mounted on a backing board - but not necessary)

       •      Masking Tape (lots) to post flipcharts around the room
             or  Push pins (alternate flipchart posting method)

       •      Eight Magic Markers (4 different colors, one color for each breakout group. Try
             to use ones that do not bleed through flipcharts onto flipcharts behind them.)
       •      Name tags
       •      Name tents
       •      Watch or clock
       •      Option 1: Video and  projection equipment for viewing 1 hour overview of the
             content of the interactive compact disc and its use in both self study arid as
             resource materials on environmental impact assessment preparation.
       •      Option 2: Computer with compact disc drive, video display hardware, and screen
             for projection and demonstration of the compact disc

                                           11

-------
Principles of Environmental Impact Assessment Review
CHECKLIST FOR PLANNING, CONDUCTING, AND COMPLETING TRAINING

Three Months Prior to the Course:

D     Send letter to host locality confirming dates of the course.

D     Establish contact person at the location where the training will take place. (This should be
       done in the initial letter).

       This person can help with problems, questions, language problems, and can receive
       shipments of supplies, texts, etc.  This person can also serve as a member of the team and
       improve successful delivery.

D     Have the course organizers review the course materials and submit feedback.

D     Review course and course materials with host locality and solicit feedback.

D     Plan your schedule. You will need to commit approximately 60-80 hours over the next
       three months for preparation for the first delivery of the course in a host locality, as well
       as the time out of the office for delivery.  Additional time may be required for scoping
       meetings prior to delivery. The second presentation should require less time.

D     Conduct scoping meeting/conference call.

D     Determine host locality's goal(s) for engagement.

D     Obtain copies of host locality's environmental regulations.

O     Develop/modify any materials required for country-specific tailoring

D     Provide host locality with copies of the course brochure. Ask locality to include a copy of
       the brochure in its participant invitations. Send enough brochures for this purpose.

D     Arrange for translation of student text by host locality.

D     Determine technical skills and education of participants.

       [This is especially important in determining which sections will be easy or difficult to
       present. The agenda and training may need to be adjusted.]

D     Share scoping materials and checklist with other Team members.
                                          12

-------
Principles of Environmental Impact Assessment Review
Two Months Prior to the Course:

D     Complete your travel documents and submit them to the Office of International Activities
       for approval.

D     Make your travel reservations (airlines, hotel, etc.).

D     Buy a good travel guide from a local bookstore.  They often have good information about
       local customs and mores.  Also, you may consult with your host country contact.

D     Learn a few key phrases of the native language, such as "Hello", "Thank You," "Please,"
       and "Do You Speak English?"

D     Find out if there are any particular customs with respect to eating times, siestas, etc. that
       may impact the agenda for the course.  Rearrange the agenda to accommodate these local
       customs.  This information can be obtained easily from your host country contact.

One Month Prior to the Course:
                                      ^
D     Ship training materials well in advance of the training dates.

       Make sure that all materials needed for the course are at the training location prior to
       departure for the location. This is important. Easels, markers, flipcharts, and other
       "office" supplies may not be available or may be very expensive in certain countries. Also
       remember that there will be a very large quantity of materials, between the supplies and
       the case study environmental impact assessment documents, to ship. Plan and budget
       accordingly.

D     Make sure that your lodging is as comfortable as possible.

       The course requires extensive concentration, and facilitators need quality sleep time.  Care
       should  be taken not to offend the host of the training, but your comfort and rest are
       important to the success of the course.

D     Conduct a practice session for delivery of the course.

D     Decide what signatures will appear on the Certificates of Completion that will be given to
       each participant. Determine which signatures must be obtained prior to shipping materials
       to the host country site, as it wilt be difficult or impossible to obtain those signatures once
       the course has commenced.
                                           13

-------
Principles of Environmental Impact Assessment Review
During the Course:

O     Allow at least one day for acclimation to the time and culture change. More time may be
       necessary with time changes greater than six or seven hours.

       While sightseeing may not be on the agenda, become familiar with the surroundings of the
       classroom and the area.

D     Always reconfirm ALL airline tickets, including internal travel. Tickets could be canceled
       if you do not.

D     Cany an English translation dictionary.

D     Allow time to rearrange the classroom to a configuration that is comfortable and
       conducive to learning. A "IT shape is recommended and encouraged.

D     Have a separate room near the classroom for facilitator preparation. This can also serve
       as a get-away room for impromptu meetings.

D     Have a translator in the room who is familiar with technical language.

       While the participants may be able to speak and understand English, there may be times
       when the translator can explain something in the native language that will help the
       participants to understand a key concept.

H     Take a photograph of the participants as a way of highlighting the importance of the
       course and their value in participating.

       Make sure the picture is taken with proper lighting and that all participants are visible.
       Send copies of the photo to each participant.

D     Bring trinkets with you as "prizes" for participation.

       This will be greatly appreciated, increase the level of fun, and serve as a reminder of the
       course.  If possible, make sure you have one for everyone. However, EPA funds may not
       be used to procure these gifts or trinkets.

D     Make yourself available to answer questions during breaks or after the sessions.
                                           14

-------
Principles of Environmental Impact Assessment Review
One Month After the Course:

D     Plan your time. Follow up can require 4 to 24 hours, depending upon promises made
       prior to departure.

D     If you promise to provide the participants with answers to questions or additional
       materials on your return, make sure you do so.

D     Complete trip report, attach correspondence, and send to module manager.
Three to Six Months After the Course:

D     Contact host locality to determine whether the engagement was successful.

D     Organize an evaluation of the utility of the training and any specific capacity building
       needs.
                                          15

-------
Principles of Environmental Impact Assessment Review
                       COURSE MATERIALS MATRIX
SESSION/TITLE
1 Welcome and
Introduction
2 Reviewer's Role in
the Environmental
Impact Assessment
Process
3 Review Approach for
Overall
Environmental
Impact Assessment
Document and
Scoping
HANDOUTS
Participants List [1-1]
Agenda [l-2a or l-2b]
Course Evaluation Form [1-3]
Definitions [2-1]
Environmental Impact Assessment
Process [2-2] 	
Reviewer's Roles [2-3]
Case Studies (4 draft
environmental impact
assessments, with copies of each
for 1/4 of participants);
Supplemental Table of Contents
for Case Studies [3-1]
Instructions for Overall and
Scoping Review [3-2]
FLIPCHARTS [chart number]
(P) Welcome [M]
(B) Goals for the Training
(P) Course Goal [1-2]
(P) Reviewer Situations [1-3]
(P) Ground Rules [1-4]
(P) Agenda [1-Sa or 1-Sb]
(B) Why Environmental Impact
Assessment?
(P) Environmental Impact Assessment
Definition [2-1]
(P) Environmental Impact Assessment
Process [2-2]
(P) Understanding the Context (1) [2-3]
(P) Understanding the Context (2)[2-4]
(P) What is the Focus During an
Environmental Impact Assessment
Review [2-5]
(P) Environmental Impact Assessment
Document Contents [2-6]
(B) What is a Good Review?
(P) Environmental Impact Assessment
Document Contents [2-6]
(B) What is a Good Review?
(B) Approaches to Overall Environmental
Impact Assessment Document
Review
(P) Road Map for Overall Environmental
Impact Assessment Review (1)[3-1]
(P) Road Map for Overall Environmental
Impact Assessment Review (2)[3-2]
(B) Approaches to Scoping Review
(P) Road Map for Scoping Review [3-3]
(P) Tools and Techniques for Scoping
Review [3-4]
(P) Advice for Reviewers [3-5]
(P) = Prepared flipchart is produced in advance. 8'/3"xlP versions of these flipcharts are in Appendix B.
(B) = Blank Flipchart is used by the facilitator to record the discussion
                                   16

-------
Principles of Environmental Impact Assessment Review
SESSION/TITLE
4 Review of Purpose
and Need and
Alternatives
5 Review of Description
of Environmental
Setting
6 Review of Potential
Environmental
Impacts
7 Review of Proposed
Mitigation
8 Introduction to
A Preparing and
Communicating
Review Comments on
a Draft
Environmental
Impact Assessment
HANDOUTS
Instructions for Purpose and Need
and Alternatives Review
[4-1]
Local Information and Sources
[5-1]
Environmental Setting Document
Excerpts [5-2]
Instructions for Environmental
Setting Review [5-3]
Environmental Setting Checklist
[5-3]
Environmental Impact Evaluation
- Document Excerpts [6-1]
Environmental Impact Checklist
[6-2]
Instructions for Review of Impacts
in Case Studies [6-3]
Proposed Mitigation Document
Excerpts [7-1]
Instructions for Review of
Proposed Mitigation [7-2]
Instruction for Management Plan
Development [8-1]
FLIPCHARTS [chart number]
(P) Project/Purpose and
Need/Alternatives [4-1]
(B) Purpose and Need and Alternatives
(B) Project Description
(B) Benefits of Evaluating Alternatives
(P) Alternatives [4-2]
(P) Road Map for Purpose and Need and
Alternatives Review (l)[4-3]
(P) Road Map for Purpose and Need and
Alternatives Review (2)[4-4]
(P) Natural and Human (Socioeconomic)
Environment Types [5-1]
(P) Kinds of Data (5-2]
(P) Sources of Data [5-3]
(P) Information and Sources [5-4]
(B) Adequacy
(P) Road Map for Environmental Setting
Review [5-5]
(P) Types of Environmental Impacts [6-
1]
(P) Examples of Environmental Impacts
[6-2]
(B) Significance
(P) Road Map for Environmental Impacts
Review [6-3]
(P) Hierarchy of Mitigation Types [7-1]
(P) Road Map for Mitigation Review ( 1 )
[7-2]
(P) Road Map for Mitigation Review (2)
[7-3]
(P) Road Map for Overall Review (1)
[3-1]
(P) Road Map for Overall Review (2)
[3-1]
(P) Road Map for Draft Environmental
Impact Assessment Review [8-1]
(P) = Prepared flipchart is produced in advance. 8'/3" x 1 1" versions of these flipcharts are in Appendix B.
(B) = Blank Flipchart is used by the facilitator to record the discussion
                                      17

-------
Principles of Environmental Impact Assessment Review
SESSION/TITLE
8 Preparing and
B Communicating
Review Comments on
a Draft
Environmental
Impact Assessment
9 Reviewing a Final
Environmental
Impact Assessment
for Response to
Comments
1 Preparation of a
0 Record of Decision
and Mitigation Plan
1 Resources for a
1 Reviewer
1 Country-Specific
2 Applications
Final Wrap-Up and
Course Evaluation
HANDOUTS
Instruction for Management Plan
Development [8-1]
Road Maps and Tools and
Techniques [8-2
Instructions for Communication
Letter Development [8-3]]
Selected Public Comment for Each
Case Study [8-4]
Final Case Studies for all
participants
Instructions for Review of the
Final Environmental Impact
Assessment [9-1]
Road Map for Record of Decision
Preparation [10-1]
Road Map for Mitigation Plan
Preparation [10-2]
Instructions for Record of Decision
and Mitigation Plan Development
[10-3]
Mitigation Follow-up and Action
Plan [10-4]
[Resource Manual and Student
Text Referenced During the
Session Should be Distributed on
Day 1 of the Course]
Compact Disc
TBD by Sponsor Country
Course Evaluation Form [13-1]
Certificates of Completion
FLIPCHARTS [chart number]
(P) Road Map for Overall Review (1)
[3-1]
(P) Road Map for Overall Review (2)
[3-1]
(P) Road Map for Draft Environmental
Impact Assessment Review [8-1]
(P) Road Map for the Communication
Letter [8-2]
(P) Road Map for Final Environmental
Impact Assessment Review (1) [9-1]
(P) Road Map for Final Environmental
Impact Assessment Review (1) [9-
2]
(P) Road Map for Decision Preparation
[10-1]
(P) Road Map for Mitigation Plan
Preparation [10-2]
(P) Resources for a Reviewer [11-1]
(P) Country-Specific Contexts [12-1]
(P) Reviewer's Code [13-1]
(P) = Prepared flipchart is produced in advance. 8!4" x 1 P versions of these flipcharts are in Appendix B.
(B) = Blank Flipchart is used by the facilitator to record the discussion
                                       18

-------
Principles of Environmental Impact Assessment Review
FACILITATORS'
NAMES:
                     EXAMPLE FACILITATOR SCHEDULE
               J. Burke (IB)
               E. Wright (EW)
               M. Boyer (MB)
               E. Rboads (ER)
                       EXTRA
                       RECORDERS:
D. Algazi (DA)
P. Claggett (PC)
 Day 1 set up:
 Day 2 set up:
 Day 3 set up:
 Day 4 set up:
ER&JB
MB&EW
ER&EW
JB&MB
                                  SCHEDULE
Si^^=5SS?i




': .v," : ":•-•"," ,"' ' '": : ''<''•'- :•'' '•-.'. ;;" ' .-.•••. ::•"•: •*:'.:i
'!":lSA;V *T*\i/iQ "''''"' '''""<-•'" *'•• •'•'




DAY THREE


^DAY-FOUR





-ISM-t
i
2
3
4
.-•>
Session ft
5
6
7
8A
Session i
8B
9
Session #
10
11

12
Wrap-Up
:^F^^Iii|
JB
EW
MB
ER

Facilitator
JB
EW
MB
ER
Facilitator
JB
EW
Facilitator
MB
ER (or host
country)
JB
EW
'•••"'' •'••-i1V'1::':i.X:''".:''-::'5y-:i'*'X : -;•
"• Recorder •:,:- jjx1''-^^^
ER
JB
EW
MB

Recorder
ER
JB
EW
MB
Recorder
ER
JB
Recorder
EW
MB

ER
JB

EW
MB
ER
JB
'
On-Deck
EW
MB
ER
JB
On-Deck
EW
MB
On-Deck
ER
JB

EW
MB
                                     19

-------
Principles of Environmental Impact Assessment Review
FACILITATORS'
NAMES:
                   FACILITATORS' SCHEDULE TEMPLATE
 Day 1 set up:
 Day 2 set up:
 Day 3 set up:
 Day 4 set up:
                                  SCHEDULE






DAY TWO



DAY THREE


DAY FOUR




:^seSli;S
1
2
3
4
5
Session*
6
7
SA
Session #
SB
9
Session #
10
11
12
Wrap-Up






Facilitator



Facilitator


Facilitator










Recorder



Recorder


Recorder










On-Deck



On-Deck


On-Deck




                                     20

-------
Principles for Environmental Impact Assessment Review
                       Agenda(A)
      (Times correspond with the materials in the Facilitator's Manual)
Day
1

Time
8:30
9:10
10:00
12:00
1:00
3:05
5:00
Session
(0:45)
1
(0:50)
2
(2:00)
Including
Break
(1:00)
3
(2:05)
4
(1:55)

Title
Registration (0:30)
Welcome and Introduction
(D) Introductions (0:20)
(D) Introduction to Four Reviewer Situations (0:10)
(D) Purpose and Background (0:10)
(D) Overview of the Agenda (0:10)
Reviewer's Role in the Environmental Impact Assessment Process
(D) Why Environmental Impact Assessment? Environmental Impact
Assessment Review, Process and Key Definitions (0:15)
(D) Environmental Impact Assessment Definitions and Process (0:1 5)
(S) Reviewer Roles in Each Phase of Process (0:20)
Break (0:20)
(D) Report on Reviewer Roles (0:10)
(D) Reviewer's Context (0:15)
(D) Reviewer's Focus (0: 15)
(D) Good Reviews (0: 10)
Lunch
Review Approach for Overall Environmental Impact Assessment Document and
Scoping
(D) Introduce Case Studies (0:05)
(D) Approach to Overall Review (0:10)
(D) Identifying Significant issues: Scoping (0:10)
(I) Overall and Scoping Case Study Review
(Break Included) (0:75)
(D) Report on Overall and Scoping Review (0:15)
(D) Tools and Techniques and Advice to Reviewers (0: 1 0)
Review of Purpose and Need and Alternatives
(D) Key Review Concepts: Project Description, Purpose end Need, and
Reasonable and Feasible Alternatives (0:15)
(D) Review for Appropriate Alternatives (0:10)
(D) Introduction to Reviewer's Road Map (0: 10)
(S) Purpose and Need and Alternatives Review Exercise (0:45)
(D) Report-out on Purpose and Need and Alternatives (0: 15)
(D) Session Wrap-Up (0:10)
(D) Day 1 Wrap-Up (0:10)
Adjourn
                           21

-------
     Principles for Environmental Impact Assessment Review
                                    Agenda (A)
             (Times correspond with the materials in the Facilitator's Manual)
Day
Time
Session
Title
          8:30
             5
           (2:15)
                              (D)
                Overview of Previous Sessions (0:10)
                Components of Environmental Setting (0:15)
                Approach to Environmental Setting Review (0:10)
                Environmental Setting Case Study Review (0:50)
                Report-Out on Environmental Setting Review Reports from Small
                Groups (0:25)
                Session Wrap-Up (0:10)
                Break (0:15)
          10:45
            6
          (3:35)  '
         Including
          Lunch
          Review of Potential Environmental Impacts
          (D)   Environmental Impact Definition and Forecasting Methodologies
                (0:40)
          (D)   Approach to Environmental Impacts Review (0:10)
          (S)   Environmental Impacts Review (lunch included) (2:20)
          (D)   Report-Out on Environmental Impacts Review (0: IS)
          (D)   Advice to Reviewers List (0:10)
          2:20
            7
          (1:40)
          Review of Proposed Mitigation
          (D)   Types of Mitigation and Review of Proposed Mitigation (0:10)
          (D)   Mitigation Effectiveness (0:10)
          (D)   Approach to Mitigation Review (0:15)
          (S)    Review of Proposed Mitigation (includes break) (0:45)
          (D)   Report-Out on Review of Proposed Mitigation Review (0:15)
          (D)   Advice to Reviewers (0:05)
          4:00
            8A
          (1:00)
          5:00
          Introduction to Preparing and Communicating Review Comments on a Draft
          Environmental Impact Assessment
          (D)   Draft Environmental Impact Assessment Review (0:15)
          (S)    Development of a Management Plan (0:45)


          Adjourn
                                           22

-------
      Principles for Environmental Impact Assessment Review
                              Agenda (A)
            (Times correspond with the materials in the Facilitator's Manual)
Day
3
Time
8:30
1:00
2:00
2:30
5:00
Session
SB
(6:00)
Including
Lunch
9
(2:30)
Including
Break

Title
Preparing and Communicating Reviewer Comments on a Draft Environmental
Impact Assessment
(S) Preparing and Communicating Reviewer Comments (including lunch)
(4:30)
(D) Review of Comment Letters Report-out ( 1 :00)
(D) Discussion of Public Comments (0:30)
Reviewing a Final EnvironnKntfll Impact Assessment for Response to Comments
(D) Final Environmental Impact Assessment Review Introduction (0:15)
(S) Final Environmental Impact Assessment Review (including break) (1 :30)
(D) Report-Out on the Final Environmental Impact Assessment Review
(0:40)
(D) Advice to Reviewers (0:05)
Adjourn
(D): Group Discussion
(I):  Individual Review
(R): Report Out
(S): Small Group
                                   23

-------
      Principles for Environmental Impact Assessment Review
                              Agenda(A)
            (Times correspond with the materials in the Facilitator's Manual)
Day
4





Time
8:30
10:40
12:15
1:30
4:30
5:00
Session
10
(2:20)
11
(1:35)
0:15)
12
(3:00)
including
break
13
(0:30)

Title
Preparing and Supporting a Record of Decision and
Mitigation Plan
(D) Record of Decision and Mitigation Plan Introduction (0: 1 0)
(D) Approach to Record of Decision and Mitigation Plan Preparation (0: 1 0)
(S) Preparing a Record of Decision and Mitigation Plan (includes break)
(1:20)
(D) Record of Decision and Mitigation Plan Report (0:30)
Resources for a Reviewer
(D) Review of Student Text (0:02)
(D) Review of Principles of Environmental Impact Assessment Review
Resource Manual (0:03)
(D) Review of the Compact Disc Programs and Use (0:05)
(D) Demonstration of the Compact Disc Programs (1:00)
(D) Discussion of the Compact Disc Programs and Other Resources (0:25)
Lunch
Country-Specific Applications
(L) Group Discussion (includes break) (3:00)
Final Wrao-Uo and Course Evaluation
(D) Day 4 Wrap -up (0: 10)
(I) Course Evaluation (0:20)
Adjourn
Legend
(D): Group Discussion
(I):  Individual Review
(R): Report Out
(S): Small Group
                                   24

-------
   Principles of Environmental Impact Assessment Review
                         Agenda (B)
(Times in the Facilitator's Manual can be adjusted to accommodate a modified schedule)
Day
Evening
Time
3:00
3:20
3:40
4:30
6:30
Session
(0:20)
(0:20)
1
(0:50)
2
(2:00)
Including a
Break

Title
Registration
Guest Speaker - Welcome Address
Welcome and Introduction
(D) Introductions (0:20)
(D) Introduction to Four Reviewer Situations (0:10)
(D) Purpose and Background (0:10)
(D) Overview of the Agenda (0:10)
Reviewer's Role in the Environmental Impact Assessment Process
(D) Why Environmental Impact Assessment? Environmental Impact
Assessment Review, Process and Key Definitions
(0:15)
(D) Environmental Impact Assessment Definitions and Process(0: 15)
(S) Reviewer Roles in Each Phase of Process (0:20)
Break (0:20)
(D) Report on Reviewer Roles (0; 1 0) minutes
(D) Reviewer's Context (0:1 5)
(D) Reviewer's Focus (0: 1 5)
(D) Good Reviews (0:10)
Adjourn
                              25

-------
   Principles of Environmental Impact Assessment Review          ^
                         Agenda (B)                                1
(Times in the Facilitator's Manual can be adjusted to accommodate a modified schedule)
Day
1
Time
8:30
9:00
11:30
3:00
3:20
5:00
Session
(0:30)
3
(2:30)
4
(3:30)
Including
Lunch
*

5

Title
Registration
Review Approach for Overall Environmental Impact Assessment Document ami
Scoping
(D) Introduce Case Studies (0:05)
(D) Approach to Overall Review(0: 1 0)
(D) Identifying Significant issues: Scoping (0: 10)
(I) Overall and Scoping Case Study Review
(Break Included) (0:80)
(D) Report on Overall and Scoping Review (0:30)
(D) Tools and Techniques and Advice to Reviewers (0: 1 5)

(D) Key Review Concepts: Project Description, Purpose and Need, and
Reasonable and Feasible Alternatives (0:30)
Lunch (0:60)
(D) Review for Appropriate Alternatives (0:10)
(D) Introduction to Reviewer's Road Map (0: 1 0)
(S) Purpose and Need and Alternatives Review Exercise ( 1 :00)
(D) Report-out on Purpose and Need and Alternatives (0:30)
(D) Session Wrap-Up (0: 10)
Break
Review of Description of the Environmental Setting
(D) Components of Environmental Setting (0:30)
(D) Approach to Environmental Setting Review (0:10)
(S) Environmental Setting Case Study Review (0:50)
(D) i Day 1 Wrap-Up (0:10)
Adjourn
                              26

-------
   Principles of Environmental Impact Assessment Review
                         Agenda (B)
(Times in the Facilitator's Manual can be adjusted to accommodate a modified schedule)
Day
2
Time
8:30
9:40
10:00
2:20
4:00
5:00
Session
5
(1:20)

6
(4:20)
Including
Lunch
7
(1:40)
8A
(1:00)

Title
Review of Description of the Environmental Setting
(D) Overview of Previous Sessions (0:10) ;
(D) Report-Out on Environmental Setting Review Reports from Small Groups
(1:00)
(D) Session Wrap-Up (0:10)
Break
Review of Potential Environmental Impacts
(D) Environmental Impact Definition and Forecasting Methodologies
(1:00)
(D) Approach to Environmental Impacts Review (0:20)
(S) Environmental Impacts Review (lunch included) (2:20)
(D) Report-Out on Environmental Impacts Review (0:30)
(D) Advice to Reviewers List (0: 10)
Review of Proposed Mitigation
(D) Types of Mitigation and Review of Proposed Mitigation (0: 10)
(D) Mitigation Effectiveness (0:10)
(D) Approach to Mitigation Review (0: 1 S)
(S) Review of Proposed Mitigation (includes break) (0:45)
(D) Report-Out on Review of Proposed Mitigation Review (0: 1 5)
(D) Advice to Reviewers (0:05)
Introduction to Preparing and Communicating Review Comments pfl £ Draft
Environmental Impact Assessment
(D) Draft Environmental Impact Assessment Review(0: 1 5)
(S) Development of a Management Plan (0:45)
Adjourn
                              27


-------
   Principles of Environmental Impact Assessment Review
                         Agenda (B)
(Times in the Facilitator's Manual can be adjusted to accommodate a modified schedule)
Day
3
Time
8:30
1:00
2:00
2:30
5:00
Session
8B
(6:00)
Including
Lunch
9
(2:30)
Including
Break

Title
Preparing and CtHIunynicating Reviewer Comments on a Draft
Environmental Impact Assessment
(S) Preparing and Communicating Reviewer Comments
(including lunch) (4:30)
(D) Review of Comment Letters Report-out (1:00)
(D) Discussion of Public Comments (0:30)
Reviewing a Final Environmental Impact Assessment for Response
to Comments
(D) Final Environmental Impact Assessment Review
Introduction (0:1 5)
(S) Final Environmental Impact Assessment Review (including
break) (1:30)
(D) Report-Out on the Final Environmental Impact Assessment
Review (0:40)
(D) Advice to Reviewers (0:05)
Adjourn
                              28

-------
   Principles of Environmental Impact Assessment Review
                         Agenda (B)
(Times in the Facilitator's Manual can be adjusted to accommodate a modified schedule)
Day
4





Time
8:30
10:40
12:15
1:30
4:30
5:00
Session
10
(2:20)
11
(1:35)
(1:15)
12
(3:00)
Including
Break
13
(0:30)

Title
Preparing and Supporting a Record of Decision and
Mitigation Plan
(D) Record of Decision and Mitigation Plan Introduction (0: 10)
(D) Approach to Record of Decision and Mitigation Plan
Preparation (0:10)
(S) Preparing a Record of Decision and Mitigation Plan
(includes break) (1:20)
(D) Record of Decision and Mitigation Plan Report (0:30)
Resources for a Reviewer
(D) Review of Student Text (0:02)
(D) Review of Principles of Environmental Impact Assessment
Review Resource Manual (0:03)
(D) Review of the Compact Disc Programs and Use (0:05)
(D) Demonstration of the Compact Disc Programs (1:00)
(D) Discussion of the Compact Disc Programs and Other
Resources (0:25)
Lunch
Country-§pecjfic Applications
(L) Group Discussion (includes break) (3:00)
Final Wran-Uo and Course Evaluation
(D) Day 4 Wrap -up (0:10)
(I) Course Evaluation (0:20)
Adjourn
                              29

-------
30

-------
Principles of Environmental Impact Assessment Review
                                                    Facilitator's Manual
                   SESSION 1: WELCOME AND INTRODUCTION
 MATERIALS:
 Flipcharts:   1-1 Welcome
              1-2 Course Goal
              1-3 Reviewer Situations
              1-4 Ground Rules
              1-5 Agenda
                                     TIME:  50 minutes
                                 SETTING:  Group discussion
 Handouts:
 Other:
1-1 Facilitators/Participants List
1-2 Agenda
1-3 Course Evaluation Form
 TEXT:
NA
 PURPOSE:  •  Meet the participants and facilitators for the course
              •  Review training goals and clarify how participant goals may be met
              •  Ensure participants understand the training approach for the course
              •  Ensure participants understand the schedule for the course and what to
                 anticipate
 TIME BREAKDOWN:
 Part A  Introductions
 Part B  Introduction to Four Reviewer Situations
 Part C  Purpose and Background
 Part D  Overview of the Agenda
                                Group Discussion
                                Group Discussion
                                Group Discussion
                                Group Discussion
                                  20 minutes
                                  10 minutes
                                  10 minutes
                                  10 minutes
PART A.    Introductions (Group Discussion, 20 min.)

DISPLAY FLIPCHART #1-1 (WELCOME).

    Good morning. Welcome to the Principles of Environmental Impact Assessment Review.
    We are pleased to have representation from_ (CITE ORGANIZATIONS).  Thank you all for
    attending.
    My name is
    course.
     _. I work for
in       I will be one of the facilitators for this
                                        1-1
                                                      July 1998

-------
Principles of Environmental Impact Assessment Review
Facilitator's Manual
BRIEFLY DESCRIBE YOUR PROFESSIONAL BACKGROUND AND EXPERIENCE WITH ENVIRONMENTAL
IMPACT ASSESSMENTS. INTRODUCE CO-FACILITATORS AND ASK THEM TO DESCRIBE THEIR
EXPERIENCES.

Participant Introductions

    •  At this time I would like each of you to introduce yourself, and state where you are from,
       the agency you represent, and what you do. Also, tell us what your interest and
       experience is in reviewing environmental impact assessments, and share your goals for
       taking the course (what do you want to gain from this experience?).

GO AROUND THE ROOM. As PARTICIPANTS ARE INTRODUCING THEMSELVES, RECORD THE GOALS
ON A BLANK FLIPCHART.

DISPLAY FLIPCHART #1-2 (COURSE GOAL).

    The course goal is to support your capacity to effectively review environmental impact
    assessment documents and participate in the environmental impact assessment process.

BRIEFLY TIE IN THE COURSE GOAL WITH GOALS THAT THE PARTICIPANTS CITED. ARE THEY THE
SAME? POINT TO THE TWO FLIPCHARTS. COMPARE. POST THE FLIPCHARTS ON THE WALL.

PART B.    Introduction to Four Reviewer Situations (Group Discussion, 10 min.)

    Now that we have met each other, I would like to introduce you to four reviewers who are
    also going to be part of this course. These four reviewers represent situations you may find
   yourselves in at any given time. First, I would like you to meet "Solo."

REVEAL FLIPCHART # 1-3 (REVIEWER SITUATIONS) POINTING TO THE FIRST FIGURE.

    Solo

    "Solo " is sitting in this windowless office with a bare light bulb overhead. Piled on his or
    her desk are dozens of environmental impact assessments to review. And they are also piled
    on the floor and out the door. Solo is alone in this windowless office reviewing
    environmental impact assessments.

    •  This is, of course, somewhat exaggerated, but does anyone recognize "Solo " or at least
       the feeling or fear of being "Solo "? Can we choose a better name than "Solo"? (Let's
       call him or her:	./
                                         1-2
  July 1998

-------
Principles of Environmental Impact Assessment Review	Facilitator's Manual

    Empowered

    The next reviewer I would like you to meet is "Empowered " Empowered has a window on
    the world.  Empowered has a resource library, a network of experts to call upon, access to
    inside information on projects and stakeholders — that is, those who have a stake in the
    outcome of a proposed action — including government and non-governmental contacts and
    decision makers.

    Empowered has maps and other information and background on the geographic area
    affected. Empowered is organizationally "solo," but not alone or without the means to find
    out what he or she needs to know.

    •   Does anyone recognize "Empowered"? Can you think of a better name for our
        reviewer?

    Lead

    The next reviewer is the "Lead" reviewer.  Environmental impact assessment documents
    may be reviewed by an individual or a team led by an individual within an organization
    which requires environmental impact assessment. In his or her organization, for our
    "Lead" reviewer, responsibilities include review of environmental impact assessments,
    preparation of comments, and official coordination of review among experts in related
    organizations and departments.  These other reviewers are sometimes referred to as
    "associate " reviewers.  The lead reviewer is a manager of the review process.

    • Does anyone recognize "Lead"? Can we give the "Lead" reviewer a name?

    Proactive

    Finally, we have "Proactive." This reviewer gets involved before an environmental impact
    assessment is drafted, early in the process, so he or she and the project proponent can
    define what they expect before it is developed.

    • Does anyone recognize "Proactive "?  What should we name him or her?

    These four different reviewers reflect four different actual situations any one reviewer can
   find themselves in when carrying out their role as a reviewer.  Even the most experienced,
    connected, and empowered reviewer may find themselves in Solo's situation.  They may be
    given too many environmental impact assessments to review in a short period of time on
    subjects or areas for which they cannot draw upon their normal resources.
                                         1-3                          July 1998

-------
Principles of Environmental Impact Assessment Review
Facilitator's Manual
    We will take these four reviewers with us on our journey through the review process. They
    mil remind us of these different situations so that we can ask ourselves what we would do if
    we were in their situation —for every reviewer must be flexible and prepared to be in any of
    these situations.  During the first two days of this course you will be acting in a role similar
    to the "solo reviewer." One objective of the course is to provide you with the knowledge
    and tools to enable each of you to become an "empowered reviewer" of environmental
    impact assessment documents. On the third day. of the course you will have an opportunity
    to carry out the "lead reviewer " roles in your groups.

    Throughout the process we will discuss what a reviewer might do when there is an
    opportunity to be more proactive to prevent problems before they arise. One way to move
   from a solo reviewer into a proactive one is to learn what resources are available to you
    and this is one of the primary course objectives.

    In front you of you should find several resources which will be introduced in the course:
    (I) the Student Text for this course, which should be in front of you, that covers the role of
    the reviewer in the EIA. process, and offers important tools and approaches to make the job
    of reviewer successful in any of the four reviewer situations;
    (2) the Student Text for the companion course, "Principles ofEnvironmenta Impact
    Assessment" which also contains reference materials on which you can draw.
    (3) the "Principles of EIA Review Resource Manual, " which also should be in front of you.
    The Resource Manual contains overview material and information on each element of the
    EIA process along with methodologies of EIA preparation and review as well as laws,
    regulations and guidance documents from numerous sources, including the World Bank and
    USEPA. Two guidelines are included in their entirety, one on the ecological impacts of
    highways and the other on the development of EIA for the mining sector;
    (4) Checklists for each stage of the EIA process, which can be found in Appendix C.2 of the
    Student Text and also in the Resource Manual; and
    (5) the compact disc accompanying the Resource Manual and part of this cause, titled,
    "Environmental Assessment Case Study, " which contains both an EIA resource guide of
    tools, issues, and reference materials for each stage of the EIA process and an interactive
   program that walks through the EIA process using an actual proposed project — the
    Diamond Dhuitna Coal project in Alaska and also provides a vehicle for applying this same
    logic and tool to any EIA.

    You will have an opportunity to draw upon these resources throughout the course. These
    materials are available to you to take home with you as will be the example Environmental
    Impact Assessment documents we will be introducing in the course.  In Session 11, we will
    go over these resources in more detail.

    • Does anyone have any other comments or questions about the reviewer situations or the
      reference material?
                                          1-4
  July 1998

-------
Principles of Environmental Impact Assessment Review	Facilitator's Manual
DISTRIBUTE HANDOUT* l-l (FACILITATORS/PARTICIPANTS LIST).

    / have just placed before you contact information for facilitators and participants for this
    course, to help you develop a network of contacts. One goal of the training is to build in-
    country and international networks for mutual assistance.

PartC. Purpose and Background (Group Discussion, 10 min.)

    Before we begin, I want to offer background on the origins of the course.  This course for
    reviewers is a sequel to the original course, "Principles of Environmental Impact
    Assessment." That course was one of the early environmental management courses
    developed by the U. S. EPA. The Principles course and others in the series were initially
    developed at the request of environmental agencies in Central and Eastern Europe that were
    concerned about the devastating effects of industrial operations on the environment and
    human health.  The governments were interested in preventing new environmental problems
    and strengthening public participation in the environmental impact assessment process, f
    Since its delivery in Europe, the Principles of Environmental Impact Assessment training
    course has been successfully delivered in numerous countries around the world and
    translated into several languages.

    The Principles of Environmental Impact Assessment course was designed around well-
    established international frameworks for environmental impact assessment.  We encouraged
    participants to think about the reasons for different elements of environmental impact
    assessment. By allowing them to reason and derive certain parts of the environmental
    impact assessment process on their own, applied to a realistic case study,  we hoped that
    citizens, members of academic institutions and policy-makers would finish the course with a
    deeper appreciation for the elements of environmental impact assessment and a common
    language to work together to design their own or improve an existing program.

    Some participants requested more tools and training in how to develop an actual
    environmental impact assessment. Although we struggled to develop such a course, we
    quickly realized that a one-week course was insufficient to make the participants experts in
    subjects such as marine biology, air pollution and monitoring, or environmental
    engineering. Environmental impact assessment is interdisciplinary, which meant that many
    disciplines would have to be covered. Finally, we realized that if we made the course too
    technical it would miss other important needs of the participants on how to think through
    the process of review and become an effective participant in the process.

    Thus, we realized that something that was missing in environmental impact assessment
    training the world over was a course to meet the special needs of the environmental impact
    assessment  reviewer.  Without being experts in various disciplines, reviewers must be able to

                                          1-5                           July 1998

-------
Principles of Environmental Impact Assessment Review
Facilitator's Manual
    ask the right questions about the environmental impact assessment document, its analysis, of
    the experts, and the process. The reviewer should be able to pull together information from
    the various disciplines in a way that will aid decision-making.

    So, to reiterate, the goal of the Principles of Environmental Impact Assessment Review
    course is to support your capacity to be an effective reviewer. We will present to you a road
    map for the review of environmental impact assessment documents and for participation in
    the process. We mil discuss, without becoming too technical, tools and techniques available
    for the development of an environmental impact assessment and for the review of the
    documents involved. Another critical part of this facilitated course is helping you to
    discover what can go right and what can go wrong in the process and we will be developing
    some supplementary "Advice for Reviewers." You will talk about being effective reviewers
    in these different situations. Because you each bring a wide range of review experiences to
    the discussion, this course is a wonderful opportunity for you to identify and work through
    the rough spots of the review process and to network with colleagues.

Facilitated Training

    Now that we have all been introduced and you have an understanding of the course goals
    and background, I would like to discuss the facilitated style of learning that we will use for
    this course.

    This course is based on participant-driven learning. That means that as your facilitator, I
    will not be responsible for lecturing to you, and you will not be expected to passively absorb
    the materials I present. It is important that you participate. The review process that you
    experience through participation will remain with you after the course ends. Facilitated
    learning in turn will enable you to become effective facilitators of the course.

Role of Facilitator

    As the facilitator,  I am here to make it easier for you to share your environmental impact
    assessment review experiences with your colleagues. As your facilitator, lam here to
    introduce you to material,  answer questions about the exercises and help you to explore the
    principles of the review process. I will also help you to establish and follow the ground
    rules that will structure the way that we communicate with each other over the next four
    days.

Role of the Participant

    What are participants expected to do?  Participate as much as possible, learn from the
    experiences of your colleagues, test new ideas and look at the materials you are presented
    with from a variety of perspectives.  This course cannot work without your participation.
                                           1-6
   July 1998

-------
Principles of Environmental Impact Assessment Review	Facilitator's Manual

Ground Rules

DISPLAY FLIPCHART # 1-4 (GROUND RULES).

    In order for this course to work effectively, we must establish some ground rules. I ask that
    each of you understand and agree to follow certain ground rules:

    Listen while others are speaking because we want everyone to feel free to express their
    ideas.

    Respect others' opinions. We are here to learn from one another.  We would like to have a
    free and open exchange of ideas, so give everyone the opportunity to offer their awn views.

    There are no wrong answers. Even if you do not understand someone else's responses at
    first, these responses may stimulate other thoughts and positive new ideas.

    Use your imagination. Take a creative approach to resolving problems. Do not feel that
    you are bound to the conventional approaches to review that are used now.

    Timeliness is important since we will need adequate time to cover all of the material. Most
    importantly, we want everyone to participate in the course as much as possible.

    Participate. You will get out of this course what you put into it. Other participants will
    benefit from your thoughts.

    •  Are there additional grounds rules that you would like to add?

RECORD ANY ADDITIONAL GROUND RULES ON THE BOTTOM OF FLIPCHART #1-4.

PartD.     Overview of the Agenda (Group Discussion, 10 min.)

DISTRIBUTE HANDOUT # 1 -2 (AGENDA)

USE FLIPCHART # 1 -5 (AGENDA) TAILORED TO THE SPECIFIC DELIVERY AND THE CORRESPONDING
HANDOUT (#1-2).

    / am now handing out the Agenda for the course.  The course will last for four days (not
    including the evening welcome session).  Each day will begin promptly at 8:30 a. m., and we
    will adjourn at 5:00 p. m. We will break at noon each day for lunch and have two half-hour
    breaks each day, sometimes incorporated into a case study review session.

POINT TO ITEMS ON THE FLIPCHART AS YOU DESCRIBE THEM.

                                         1-7                          July 1998

-------
Principles of Environmental Impact Assessment Review
Facilitator's Manual
Day One

    In session 2, we will talk about the importance of environmental impact assessment, the
    reviewer's role in the environmental impact assessment process, make sure we have common
    definitions of key terms, and review the phases of the environmental impact assessment
    process. You will have the opportunity to talk about the reviewer's role in different phases of
    the environmental impact assessment process within small groups which will report out to
    the larger group on your conclusions.  Then we will discuss the context and focus for review.
    We will talk about and describe the typical environmental impact assessment document.
    The session will end with a group discussion about what makes a good environmental
    impact review. This discussion will wrap-up before we break for lunch.
    After lunch, we will hand-out different draft environmental impact assessments and assign
    you to one of four groups within which you will be working for much of the remainder of the
    course. We will begin Session 3 with a group discussion about approaches to overall
    document, process, and scoping review.  In this as in other sessions we will introduce you to
  . a road map for carrying out the review of relevant aspects of the document and process and
    give you an opportunity to apply the thinking behind the road map to an actual
    environmental impact assessment.  Road maps are designed to avoid getting "lost" during a
    review.

    Session 4, will focus on the purpose and need and alternatives sections of the environmental
    impact assessment document. In our large group, we will identify purpose and need and
    alternatives for typical projects and talk about the importance of purpose and need and the
    use and number of alternatives within the environmental impact assessment process. You
    will have an opportunity to apply the concepts in your assigned group's review of your
    actual draft environmental impact assessment.  We 'II have a  brief session wrap-up and take
    a little time to go over the day's activities before we adjourn at 5.

Day Two

    Day 2 will begin with an overview of Day 1 followed by a group discussion of environmental
    setting.  We will talk about the components of the environmental setting and approaches to
    reviewing the environmental setting section of an environmental impact assessment
    document. You will break into small groups for the environmental setting review. Small
    groups will discuss their approaches environmental setting review. After a break, we will
    continue the small group discussion and hear small group reports. Each of the small groups
    will report out to the larger group.

    When we return we will use the remainder of the morning to discuss environmental impacts,
    definitions, ways to project environmental impacts, including forecasting methods and
    approaches to review.  After lunch, we will finish up the small group discussions on
    environmental impact, and allow the small groups to report on their discussion. The
                                          1-8
  July 1998

-------
Principles of Environmental Impact Assessment Review  	Facilitator's Manual

    remainder of the afternoon will be used to talk about mitigation types, mitigation
    effectiveness and approaches to review.  We will end Day 2 with a brief session wrap-up and
    a group discussion to close the second day's activities.  We will introduce the assignment for
    establishing and implementing a management plan for the review of the entire draft
    environmental impact assessment in an integrated fashion and allow you to organize
    yourselves so that if you wish, you may use the evening period to more carefully review the
    documents.

Day Three

    On Day 3, you will move into your small groups to begin a comprehensive review of a draft
    environmental impact assessment document.  Within your small groups, you will prepare
    and implement a lead reviewer management plan, identify significant issues from an
    integrated perspective, and develop a reviewer comment letter.  After lunch the small groups
    mil have an opportunity for a short role play as different groups share their public comment
    letters with the reviewers for that case study.  We also will have an opportunity to discuss
    reviewer roles in public participation and response to public comment. We will then move
    into a large group discussion about the approaches to final environmental impact
    assessment review. The small groups will review the final environmental impact assessment
    for response to comments made on the draft.  Small group reports on the final review and
    plans for review will be presented to the larger group.  After the small group reports, we will
    wrap up the session. We will take a few minutes to review the day's activities before
    adjourning at 5 p.m.

Day Four

    On the final day of the course, we will begin with a discussion on how to prepare and
    support a record of decision and mitigation plan.  Small groups will outline and report out
    on their records of decision and mitigation plans.  We will wrap up the session with a review
    of the entire process we went through,  our road maps, tools and techniques and Advice to
    Reviewers List.

HOLD UP AND INTRODUCE STUDENT TEXT AND RESOURCE MANUAL.

    On Day Four, we will spend two hours speaking about resources for reviewers. We will
    review how you can use the Student Text and Resource Manual, which we will be referring
    to throughout the course, as an ongoing resource. We will distribute to each of you a
    compact disc that can be used as a resource for environmental impact assessment reviewers.
    When we return from lunch, we will spend the majority of the afternoon in a large group
    discussion about country-specific applications using our context for review.

                                          1-9                           July 1998

-------
Principles of Environmental Impact Assessment Review
Facilitator's Manual
DISTRIBUTE HANDOUT # 1 -3 (COURSE EVALUATION).

    At 4:30, we will have an open discussion about the course evaluation, so that you will have
    the opportunity to tell us what you liked about the course and identify areas for
    improvement.  We welcome your suggestions. The course evaluation will be followed by a
    wrap-up of the day's activities and adjournment. I am handing out the course evaluation
    form for you to complete as you go through the course.

    • Any questions or comments?

    Before we move on, I would like to go over logistics briefly.

SPECIFY NO SMOKING IN THE ROOMS - OUTSIDE ONLY.

ASK PARTICIPANTS TO SPEAK UP SO THAT OTHERS CAN HEAR THEIR COMMENTS.

REVIEW THE VIDEOTAPING AND AUDIO-TAPING PROCEDURES.

ASK THE RECORDER TO KEEP TRACK OF TIME.

Evening Welcome Session Presentation

IF A PRESENTATION IS SCHEDULED FOR AN EVENING SESSION, THIS IS THE TIME TO PREPARE THE
PARTICIPANTS FOR THE SPEAKER. STATE THE SPEAKER'S NAME, POSITION, AGENCY AND OTHER
RELEVANT CREDENTIALS FOR THE AUDIENCE. GIVE THE TITLE OF THE PRESENTATION. INVITE THE
SPEAKER TO COME TO THE PODIUM, OR FRONT OF THE ROOM.
                                       1-10
  July 1998

-------
Principles of Environmental Impact Assessment Review
                                                Facilitator's Manual
       SESSION 2: REVIEWER'S ROLE IN THE ENVIRONMENTAL IMPACT
                             ASSESSMENT PROCESS
 MATERIALS:                                    TIME: 2 hours
 Fiipcharts: 2-1 Environmental Impact           SETTING:   Group discussion
            Assessment Definition                          Small group exercise\
            2-2 Environmental Impact Assessment Process
            2-3 Understanding the Context (1)
            2-4 Understanding the Context (2)
            2-5 What is the Focus During an Environmental Impact Assessment Review?
            2-6 Environmental Impact Assessment Document Contents

 Handouts:  2-1 Definitions
            2-2 Environmental Impact Assessment Process Flow Chart
            2-3 Reviewer's Roles

 Other:     Resource Manual (e.g., 1.2,4)
 TEXT:
 3.   The Environmental Impact Assessment Reviewer's Roles and Responsibilities
 3.1  Introduction
 3.2  The Role of the Reviewer
 3.3  Reviewers and Review Teams
 3.4  Reviewer's Role in Each Element of the Environmental Impact Assessment Process
 3.5  Communicating the Findings of the Review
 3.6  Overcoming Obstacles to Effective Environmental Impact Assessment Review
 PURPOSE:
Introduce environmental impact assessment process and definitions
Examine reviewer's role in environmental impact assessment process
Introduce context for environmental impact assessment review
Introduce focus for environmental impact assessment review
Provide common foundation for what constitutes good review
                                       2-1
                                                         July 1998

-------
Principles of Environmental Impact Assessment Review
Facilitator's Manual
TIME
Part A


PartB

PartC
Break
PartD
PartE
PartF
PartG
BREAKDOWN:
Why Environmental Impact Assessment?
Environmental Impact Assessment Review,
Process and Key Definitions
Environmental Impact Assessment
Definitions and Process
Reviewer Roles in Each Phase of Process

Report on Reviewer Roles
Reviewer's Context
Reviewer's Focus
Good Reviews



Group Discussion

Group Discussion
Small Group Discussion

Group Discussion
Group Discussion
Group Discussion
Group Discussion



15 minutes

IS minutes
20 minutes
20 minutes
10 minutes
15 minutes
15 minutes
10 minutes
PART A.   Why Environmental Impact Assessment? Environmental Impact Assessment
            Review, Process, and Key Definitions (Group Discussion, 15 min.)

    New that we have reviewed the EIA process and key terms, let's discuss why ElA is
    important.

    • First, why do we develop and use environmental impact assessments? Why do you think
      environmental impact assessment is important? What does the environmental impact
      assessment process help us to do?

RECORD ON A BLANK FLEPCHART TITLED "WHY is ENVIRONMENTAL IMPACT ASSESSMENT
IMPORTANT?"

      Possible responses:   - Include public in decision-making
                          • Helps avoid environmental degradation
                          - Helps to mitigate adverse environmental impacts
                          - Helps determine the most environmentally satisfactory projects
                          - Helps decision-makers consider all aspects of their decisions
                          - Encourages more sustainable development.

    * Those are reasons why environmental impact assessment itself is important, but why then
      is having an independent REVIEW of environmental impact assessments important? As
      long as the assessment is done, isn 't that good enough? What is the value of involving
      reviewers?

RECORD ANSWERS ON THE SAME OR NEW BLANK FLIPCHART.
                                        2-2
         July 1998

-------
Principles of Environmental Impact Assessment Review	Facilitator's Manual

       Possible responses:     - Provides unbiased review of environmental impact assessment -
                             - document to ensure sound decision making
                             - Ensures significant impacts are not overlooked
                             - Ensures affected public and other stakeholders are identified and
                             appropriately involved
                             - Ensures that public concerns are addressed
                             - Ensures good decisions are made
                             - Defines conditions for operation and approval of the project
                             - Brings technical expertise to the decision-maker
                             - Facilitates the decision-making process
                             - Represents interests without a voice
                             - Insures an independent process
                             - Communicates results
                             - Is a decision-maker (e.g., acceptance/denial, conditions for
                           .  approval)
                             - Coordinates public involvement.

    Government and financial institutions which establish requirements for environmental
    impact assessment have established the independent reviewer function for many or all of
    these purposes. The scope of responsibility and authority for any particular reviewer
    situation will vary, but there are basic aspects to this job that are common no matter what
    the context.  We will be looking at all aspects of what the job of the reviewer may entail.
                                           2-3                                  July 1998

-------
Principles of Environmental Impact Assessment Review
Facilitator's Manual
 PART B.   Environmental Impact Assessment Definitions and Process (Group Discussion,
            IS min.)

 REVEAL AND REFER TO FLIPCHART #, 2-1 (ENVIRONMENTAL IMPACT ASSESSMENT DEFINITION).
 WALK THROUGH EACH COMPONENT. Focus ON THE PARTICIPANTS' PREVIOUS COMMENTS ABOUT
 A DECISION-MAKING PROCESS, THE INTERDISCIPLINARY NATURE OF THE ASSESSMENT AND REVIEW
 PROCESS, AND THE NEED FOR STAKEHOLDER INVOLVEMENT IN THE PROCESS. SOLICIT INPUT FROM
 THE PARTICIPANTS ON THE DEFINITION.

    We speak of environmental impact assessment in terms of the DOCUMENT which contains
    an analysis of impacts, alternatives and mitigation opportunities.  We also speak of
    environmental impact assessment in terms of the PROCESS,

 POST FLIPCHART #2-1 IN A POSITION WHERE IT CAN BE REFERRED TO LATER ALONG WITH THE
 REVIEWER SITUATIONS, THE ENVIRONMENTAL IMPACT ASSESSMENT PROCESS, AND THE FOCUS FOR
 REVIEW FLIPCHARTS.

    Let's move from this definition to look at the process.  What is the process? Haw do we
    define key terms? What are the components of the process? These questions will be
    discussed in this session.

DISPLAY FLIPCHART # 2-2 (ENVIRONMENTAL IMPACT ASSESSMENT PROCESS).

DISTRIBUTE HANDOUT # 2-1 (DEFINITIONS) AND HANDOUT # 2-2 (ENVIRONMENTAL IMPACT
ASSESSMENT PROCESS).

    You should have two handouts.  We will be referring to the definitions in handout # 2-1 as
    we get to key steps in the process in the environmental impact assessment flowchart,
    handout #2-2.

    It is important to ensure we are all using the same terms to mean the same part of the
    environmental impact assessment, analysis, and documentation processes.

    Take a few minutes to look through the flow chart and these definitions.

WHEN IT SEEMS THAT EVERYONE, OR ALMOST EVERYONE, HAS FINISHED READING THE HANDOUTS,
RE-START THE GROUP DISCUSSION.

    As you can see, many of the elements of environmental impact assessment are interrelated
    and there are several ways to lay out the process. However, the basic elements have been
    well established internationally.  This is a generic international framework. The
    environmental impact assessment process in [participant's country] may be similar to, or
                                       2-4
        July 1998

-------
Principles of Environmental Impact Assessment Review	      Facilitator's Manual

    different from, this "generic "process.  We mil be discussing country-specific aspects of the
    process and environmental impact assessment review on Day 4 of this course. Until then,
    we will use this generic model for the training.

OVERVIEW: INTRODUCE ALL OF THE MAIN ELEMENTS AND ACTIVITIES AND ENCOURAGE THE
PARTICIPANTS TO ANNOTATE THEIR COPIES OF THE FLOW CHART:

    • Project Initiation: NOTE THE ENVIRONMENTAL IMPACT ASSESSMENT PROCESS CAN ALSO
      APPLY TO A PLAN, POLICY, OR PROGRAM.

     • Project Implementation: In the absence of the environmental impact assessment
      process, projects, plans, policies or programs proceed directly to project implementation,
      site preparation, construction, operation and eventually to closure, and none of the
      benefits of the environmental impact assessment process you identified earlier would be
      realized. So we have created this process in between to enable us to make decisions on
      alternatives from a variety of perspectives and also to identify opportunities to mitigate
      adverse impacts and to secure positive benefits from advance planning.

    • Decision to Proceed with an Environmental Impact Assessment:

NOTE THAT THE DECISION TO PROCEED WITH AN ENVIRONMENTAL IMPACT ASSESSMENT IS BASED
UPON EITHER ESTABLISHED LAW, POLICY, GUIDANCE OR A CASE BY CASE ASSESSMENT OF
POTENTIAL FOR SIGNIFICANT IMPACT USING WHAT IS CALLED AN "INITIAL ENVIRONMENTAL IMPACT
ASSESSMENT."

IDENTIFY HOW THE DECISION TO PROCEED WITH AN ENVIRONMENTAL IMPACT ASSESSMENT LEADS
TO THE:

    • Preparation of the draft environmental impact assessment
    • Solicitation of review and comment, and
    • Preparation of the final environmental impact assessment.
                                              i.
NOTE HOW THE ANALYSIS AND DOCUMENTATION THAT WILL BE EVALUATED BY THE REVIEWER
SPAN ALL OF THE LAST THREE BULLETS AND HOW THIS ANALYSIS LEADS TO:

    • Decision-making on alternatives and mitigation
    • The record of decision and a mitigation plan.

    The actual implementation of the project initiates a process of monitoring and follow-up
    where:

    • The mitigation activities and environmental impacts are monitored, and

                                        2-5                                July 1998

-------
Principles of Environmental Impact Assessment Review
Facilitator's Manual
    •  The policies or programs are reviewed.
NOTE THAT SITE PREPARATION AND CONSTRUCTION DO NOT BEGIN UNTIL THE ENVIRONMENTAL
IMPACT ASSESSMENT PROCESS IS COMPLETE.

BRIEFLY REVIEW KEY STEPS IN THE PROCESS AND IN THE DEVELOPMENT OF AN ENVIRONMENTAL
IMPACT ASSESSMENT DOCUMENT.

    •  What is meant by key terms such as "initial environmental impact assessment, "
       "scoping," "mitigation," "alternatives," etc.7

HAVE PARTICIPANTS CONSULT AND READ FROM THE DEFINITIONS IN THE HANDOUT AND ASK IF
THEY ARE UNDERSTOOD.

POST THE PROCESS FLOWCHART ON THE WALL IN A VERY ACCESSIBLE PLACE. YOU WILL REFER TO
IT FREQUENTLY THROUGHOUT THE COURSE.

    Before we move on to discuss what the role of the reviewer is at each step in the process and
    describe the steps in more detail, are there any questions about the terms we are using and
    the general process we have described?

PART C.   Reviewer Roles in Each Phase of the Process (Small Group Discussion, 20
           min.)

    Now that we have covered the general environmental impact assessment process, let us do
    an exercise to think about the roles reviewers might have throughout the environmental
    impact assessment process.

DISTRIBUTE HANDOUT # 2-3 (REVIEWER'S ROLES). ASSIGN SECTIONS OF THE ENVIRONMENTAL
IMPACT ASSESSMENT PROCESS USING HANDOUT # 2-3 AS A GUIDE, GROUPED TO CORRESPOND TO
NUMBERS OF PARTICIPANTS.

    / need to divide you into pairs or groups of three (depending on the size of the group).

NAME THE GROUPS (1 -10, OR DIFFERENT NUMBERS DEPENDING ON THE NUMBER OF PARTICIPANTS)
AS YOU GO AROUND THE ROOM.  KEEP THE GROUPS 1 -2-3 OR 1 -2 TOGETHER NEAR WHERE THEY
ARE SEATED TO AVOID A MAJOR DISRUPTION.

    On handout #2-3, you can see a listing of all the elements of the environmental impact
    assessment process that we have just briefly reviewed on the flowchart

READ THROUGH THE LIST TO BE CERTAIN EVERYONE is FAMILIAR WITH THE STEPS IN THE PROCESS
AND REFER TO THE FLIPCHART OF THE ENVIRONMENTAL IMPACT ASSESSMENT PROCESS.
                                       2-6
        July 1998

-------
Principles of Environmental Impact Assessment Review	Facilitator's Manual

    Each group is assigned separate elements of the process to focus on for this exercise and to
    report out your results.  To do this, however, please discuss all elements of the
    environmental impact assessment process and identify whether there is a role for a reviewer.
    If there is a role, identify it.  Your specific areas of focus should receive more concentrated
    attention, and you should be prepared to report your conclusions out to all of us.

    •  Think about actual environmental impact assessment documents you have read
    •  Focus on all the roles you think a reviewer could have played during each phase of the
       process
    •  How might this change in each of the four different situations we discussed? Use side
       two of the handout to determine how your role would change under different reviewer
       situations.

    Have someone in the group record your answers, so that when we come back together again
    we can combine the answers of all of the groups. You will have 20 minutes for this
    discussion.

    •  Are there any questions?

CIRCULATE AND TALK TO THE GROUPS. CLARIFY ANY CONFUSION.

WHEN THERE ARE ABOUT 5 MINUTES LEFT IN THE EXERCISE, REMIND THE GROUPS TO COMPLETE
THEIR WORK, INCLUDING RECORDING THEIR ANSWERS. INFORM THEM OF A SHORT (20 MINUTE)
BREAK AT THIS POINT. ALLOW PARTICIPANTS TO KEEP WORKING IF THEY LIKE.

PART D.   Report  on Reviewer Roles (Group Discussion, 10 min.)

REFER TO THE FLOW CHART FLIPCHART (#2-2). FACILITATE A DISCUSSION ON THE REVIEWER'S
ROLE DURING EACH PHASE OF THE ENVIRONMENTAL IMPACT ASSESSMENT PROCESS.  ASK THE
APPROPRIATE GROUPS TO COMMENT AS ASSIGNED FOR EACH STEP IN TURN AND THEN ASK THE
WHOLE GROUP WHETHER THEY HAVE ANY ADDITIONS OR DIFFERENCES OF OPINION.  REPEAT UNTIL
ALL PHASES HAVE BEEN COVERED.

SUMMARIZE OVERALL COMMENTS AND IDENTIFY THE GENERAL PATTERNS AND THEMES THE GROUP
HAS IDENTIFIED REGARDING THE REVIEWER'S ROLE. USE THIS OPPORTUNITY TO STRENGTHEN
POINTS MADE EARLIER IN THE DAY (OR THE PREVIOUS DAY).

POINTS AND QUESTIONS TO COVER DURING DISCUSSIONS:

    •  Does the reviewer's role formally begin with the beginning of the environmental impact
       assessment process, the decision whether to proceed with environmental impact
       assessment? With project initiation?

                                        2-7                                July 1998

-------
Principles of Environmental Impact Assessment Review
Facilitator's Manual
    *  At what points in the process does a proactive review situation involve a role that the
       other reviewer situations would not?  For example, proactive review situations may
       involve keeping an eye out for new projects to bring project proponents info the process
       early. Other roles unique to the proactive role include participation in scoping, and
       deciding whether to proceed with an environmental impact assessment,

    •  At a minimum, reviewers are asked to review draft environmental impact assessments.

    •  In most settings, the reviewer is not the decision maker, but in some countries this is the
       role.

    •  A reviewer may or may not decide whether to proceed with an environmental impact
       assessment,

    •  What is different about reviewing an initial environmental impact assessment and a full
       blown environmental impact assessment?

REFER PARTICIPANTS TO STUDENT TEXT SECTIONS 3.4.2 AND 3.4.3.

    •  Initial environmental impact assessments are often distinguished by an internal rather
       than public process, and often do not involve exploration of alternatives.  However, they
       can be very detailed, depending upon how they are used in the process.

    •  Some reviewers are asked to run the public participation and comment process, and
      public scoping process. What might that role entail?

    • A reviewer may be in a position to identify or specifically require new data collection and
       compilation.

    Wrap up:  The specific roles a  reviewer has in decision-making differ based on the country,
    the organization, or even the specific situation for a particular project, plan, program, or
    policy that is being assessed. Additionally, who the reviewer has contact with may vary
    based on the country, organization represented, or situation. A reviewer may have no direct
    contact with the decision-maker, may interact with and make direct recommendations to the
    decision-maker, or may actually be the decision-maker him or herself.  The Reviewer(s) is
    usually, but not always, different from the decision-maker(s) and the decision-making
    process within an organization. Regardless of the role, a reviewer can be very influential in
    the environmental impact assessment process by ensuring a comprehensive and accurate
    assessment in support of sound decision-making.
                                          2-8
         July 1998

-------
Principles of Environmental Impact Assessment Review	Facilitator's Manual
PART E.    Reviewer's Context (Group Discussion, 15 min.)

    The important role that reviewers play in the environmental impact assessment process will
    vary, and the quality of the review can be affected by the type of role the reviewer is in.
    Therefore, when you begin each job, or even each individual task, you should understand
    the context of your review.  It is useful to characterize four contexts the reviewer must work
    within: the Legal, Institutional, Organizational, and Personal.

REVEAL THE TWO PREPARED FLDPCHARTS # 2-3 (UNDERSTANDING THE CONTEXT (1)) AND # 2-4
(UNDERSTANDING THE CONTEXT (2)). THEY SHOULD BE SET UP ON BOTH OF THE FLIPCHART
STANDS AT THE FRONT OF THE ROOM SO THE RECORDER CAN RECORD ON BOTH.

    Let us start our discussion with the Legal context. When you conduct a review, what do you
    have to understand about the legal context of the review?

       Possible responses:   - When environmental impact assessments need to be prepared
                          - Who needs to prepare them
                          - What needs to be included in an environmental impact assessment
                          document
                          - Whether public participation is required or optional
                          - The required process for environmental impact assessment
                          development
                          - Whether there are requirements for identifying alternatives
                          - The legal status of the "preferred" or "environmentally preferred"
                          alternative.

RECORD PARTICIPANT RESPONSES IN THE SPACE PROVIDED.

    On the last day we will talk specifically about the environmental impact assessment
    requirements in your country.

    •  How about the Institutional context?  What do you have to understand about that?
                                         2-9                                July 1998

-------
Principles of Environmental Impact Assessment Review
                                           Facilitator's Manual
        Possible responses:  - The institutions that are involved in the process and their roles
                           - The authorities they have
                           - The information and expertise that exists within and outside of
                           government
                           - The characteristics of the proponent's institution
                           • The characteristics of the decision-maker's institution
                           - The characteristics of the environmental impact assessment
                           preparer's institution
                           - The institution that must approve the environmental impact
                           assessment (if any)
                           - The institutions which are affected by the outcome of the
                           environmental impact assessment
                           - How key institutions relate and points of contact
                           - The role the reviewer's organization has in environmental impact
                           assessment development
                           - The limits to your and your organization's authority.

      Haw about the Organizational context within the reviewers organization?  What do you
      have to understand about that?
      Possible responses:
- The lines of authority within your organization
- Technical expertise
- The position and responsibility the reviewer has Experience
- The expectations of the reviewer's supervisors
- Decision making and communication styles
- How to obtain needed resources and expertise
• The scheduled deadline for completion of the review
- Contacts for assistance or information
- The resources that are available to me through my organization
- The resources that might be available to me through other
organizations.
      Finally, how about your Personal context? It is always the case that different people
      bring different knowledge, skills, and experiences to the job of a reviewer of
      environmental impact assessments? What do you have to understand about your
      personal context?

        Possible responses:  - My personal strengths and weaknesses as a reviewer
                           - My technical expertise
                           - My communication style
                           - My network of contacts and information sources.
                                          2-10
                                                    July 1998

-------
Principles of Environmental Impact Assessment Review	Facilitator's Manual

    • Are there other things that you might need to understand to carry out an effective review?

LINK THE REVffiW CONTEXT WITH THE REVIEW SITUATIONS DISCUSSED EARLIER. ENCOURAGE
PARTICIPANTS TO REALIZE THE STRENGTH OF THEIR OWN SKILLS AND ABILITIES.

    You can do an effective review in a "solo " situation if you understand the context that
    surrounds the review.  You can also turn a situation into one where you are "empowered"
    when you understand the resources available to you. You may be called upon to carry out
    the role of a "lead" or "associate " reviewer working with a lead reviewer, or even be able
    to take advantage of a "proactive " situation if you can fully access the  existing resources
    and influence the process.

PARTF.     Reviewer's Focus (Group Discussion* 15 min.)

    We have reviewed the environmental impact assessment process and reviewer's role in that
    process, different reviewer situations, and the context for review. Now let's discuss the
    focus of the review process, what a reviewer must look for in carrying out the review. For
    example, if I -were to give you an environmental impact assessment document to review,
    what are the important things to consider?

ENCOURAGE AN OPEN DIALOGUE FOR A MINUTE OR TWO BEFORE REVEALING FLIPCHART # 2-5
(WHAT IS THE FOCUS DURING AN ENVIRONMENTAL IMPACT ASSESSMENT REVIEW?).

    Here is a list of six things that can be critical to a review and deserve the focus of a
    reviewer's attention.  The course is structured around them.

SPEND A FEW MINUTES ON EACH OF THE SEX TOPICS. LINK THE ITEMS THEY RAISED DURING THE
EARLIER DISCUSSION. PROVIDE EXAMPLES OF WHEN THESE ITEMS ARE NOT ADDRESSED BY THE
REVIEW, WHEN THE DOCUMENT IS NOT COMPLETE, SIGNIFICANCE IS IMPROPERLY CATEGORIZED,
INTERNAL LOGIC IS FLAWED, ETC.

    Completeness and Coverage

    • When reviewing an environmental impact assessment document, -why is it important to
      focus on completeness and coverage?  Can anyone think of an example where a failure to
      be complete made a significant difference in the outcome?

    Significance

    • Why is review for significance of impacts important to a reviewer?
                                        2-11                                July 1998

-------
Principles of Environmental Impact Assessment Review
Facilitator's Manual
DISCUSS THE VALUE OF INDEPENDENT REVIEW FOR "SIGNIFICANCE," FOR "INSIGNIFICANT ISSUES,"
TO DECISION MAKING.

    Adequacy

    •  If the environmental impact assessment document does not adequately make the critical
      points you feel should be made, it is your duty to make your opinion known.
    Integrity

    • What might concern a reviewer about the integrity of the process? Of the analysis?

DISCUSS THE IMPORTANCE OF A PROCESS AND ANALYSIS HAVING INTEGRITY. WHAT HAPPENS
WHEN THE DATA SAY ONE THING AND THE CONCLUSIONS SAY SOMETHING ELSE?  WHEN
SIGNIFICANT ISSUES ARE TREATED AS INSIGNIFICANT? WHEN CONSIDERATION OF ALTERNATIVES IS
HIGHLY BIASED IN FAVOR OF A SPECIFIC PROPOSAL? WHEN REQUIREMENTS FOR PUBLIC
INVOLVEMENT ARE MET IN INEFFECTIVE WAYS?
    Accuracy
                                                \
    • Why is it important for a reviewer to ensure that the various assertions, assumptions,
      models, and findings in an environmental impact assessment document are accurate?

IT IS NOT ENOUGH FOR ALL SIGNIFICANT ISSUES AND IMPACTS TO BE ADDRESSED AND CONSIDERED
IN A LOGICAL MANNER, THEY MUST BE ADDRESSED IN AN ACCURATE WAY. LEAD A DISCUSSION
ABOUT THE ACCURACY OF THE ANALYSIS.

    Influence

    • A reviewer must be able to deliver comments and communicate in a manner that will
      influence the preparation of a sound assessment and support a desirable outcome from
      the environmental impact assessment process.

ENCOURAGE THE PARTICIPANTS TO DISCUSS THEIR POTENTIAL INFLUENCE AS A REVIEWER.
PARTICULARLY IN THE EARLY STAGES OF ENVIRONMENTAL IMPACT ASSESSMENT REVIEW, WHEN
THEY MAY HAVE THE OPPORTUNITY TO BECOME INVOLVED WITH THE ASSESSMENT AND INFLUENCE
ITS DIRECTION AND OUTCOME.

NOTE THAT IT CAN BE MUCH LESS USEFUL TO WATT UNTIL A DOCUMENT IS NEARLY COMPLETED
BEFORE OFFERING COMMENTS OR CRITIQUES. REVIEWERS CAN OFTEN FIND THEMSELVES IN A
POSITION TO INFLUENCE A PROJECT PROPONENT, AND SUCH OPPORTUNITIES SHOULD NOT BE
IGNORED.
                                      2-12
         July 1998

-------
Principles of Environmental Impact Assessment Review	Facilitator's Manual

    We mil use these six items throughout our discussions for the next 4 days.  We will consider
    the review process for each element of the environmental impact assessment and try to
    address what coverage, significance, adequacy, integrity, accuracy, and influence can
    mean.

POST FLIPCHART # 2-5 ON THE WALL IN A VERY ACCESSIBLE PLACE. YOU WILL FREQUENTLY REFER
TO IT THROUGHOUT THE COURSE.

Environmental Impact Assessment Document Outline

    Now that we have discussed a reviewer's role, the environmental impact assessment process
    and the context and focus of your review, I would like to discuss what you might see when
    looking at an environmental impact assessment document.

    Let's go back to the environmental impact assessment flowchart. Look at the phases and
    then below the phases to the types of analyses and documentation.  Where will we find
    information about these phases in an environmental impact assessment document?

       Possible responses:   - Table of contents will lead  you to much of what you seek
                          - Corresponding chapters should exist for purpose and need,
                          scoping, alternatives, environmental setting, environmental impacts,
                          and the mitigation plan
                          - Data that has been collected and compiled can often be found in
                          appendices, as well as summarized throughout the document  •

    All environmental impact assessment documents may not lay out the chapters in just this
    way.  They may use other titles, or combine sections.  What we are trying to do here is to
    give you a sense of how to navigate through an environmental impact assessment document,
    and how to understand what you are reading in the context of the overall process that
    produced the document in its various drafts.

DISPLAY FLIPCHART # 2-6 (ENVIRONMENTAL IMPACT ASSESSMENT DOCUMENT CONTENTS.)

QUICKLY REVIEW THE COMPONENTS OF THE ANALYSIS AND DOCUMENTATION.

RELATE THE FLOW CHART TO THE FLIPCHART LIST OF DOCUMENT CONTENTS.

    Again, there are different requirements for environmental impact assessment document
    contents in different countries, and we will be talking about your specific requirements on
    the last day. But many (at least one) of the documents we will be working with later will
    include the contents that are presented on thisflipchart.
                                        2-13                                July 1998

-------
Principles of Environmental Impact Assessment Review
Facilitator's Manual
    Several references have been provided in the Resource Manual that mil assist you in
    understanding the overall environmental impact assessment process and the country-
    specific laws that apply:

    1,2 Overview of the Environmental Assessment Process
    4   Country-Specific Laws/Background

PART G.    Good Reviews (Group Discussion, 10 min.)

    TITLE A BLANK FLIPCHART "WHAT IS A GOOD REVIEW?"

    So far we have identified four situations in which reviewers find themselves, discussed the
    phases and definitions of the environmental impact assessment process, and identified the
    reviewer's role, context and focus in each phase of the process.

    •  Given our discussions and your own experiences as a background, what do you think
       constitute the elements of a good review?

RECORD RESPONSES ON BLANK FLIPCHART.

       Possible responses:    - A comprehensive and accurate analysis of the issues
                           - A balanced, objective evaluation of an environmental impact
                           assessment
                           - One that communicates effectively with proponents, decision
                           makers, and others
                           • One that identifies and adequately considers all alternatives and
                           impacts
                           - One that identifies all deficiencies and makes specific
                           recommendations for addressing them
                           - One that clearly identifies and focuses on major or significant
                           issues and justifies the characterization of insignificant ones.

    As we go on through the course we can add to this at any time.

    •  Before we go on, are there any questions, comments, additions, subtractions, etc. about
       what we have covered so far?

IF THERE ARE QUESTIONS, COMMENTS, ETC. TRY TO GET THE GROUP TO ANSWER THEM UNLESS
THEY ARE CLEARLY DIRECTED AT YOUR PERSONAL EXPERIENCE.

INTRODUCE THE NEXT SESSION, AND NAME THE FACILITATORS WHO WILL BE IN CHARGE.
                                        2-14
         July 1998

-------
Principles of Environmental Impact Assessment Review
Facilitator's Manual
    We are now going to take a one hour break for lunch.  Please return promptly at [STATE
    TIME]. When we return, our next facilitator, [INTRODUCE THE NEXT FACILITATOR],
    will discuss the variety of review approaches that can be used for over-all environmental
    impact assessment review and scoping. In this session, we will go over step-by-step
    approaches to reviewing the EIA document and the scoping section of the document in
    particular.

NOTE: THE FLIPCHARTS "ENVIRONMENTAL IMPACT ASSESSMENT DOCUMENT CONTENTS" AND
"WHAT is A GOOD REVIEW" SHOULD BE LEFT UP ON THE EASELS. KEEP THEM THERE INTO THE
BEGINNING OF THE NEXT SESSION DM ORDER TO CONCEAL THE NEXT PREPARED FLIPCHARTS FOR
THAT SESSION UNTIL THE FACILITATOR IS READY TO USE THEM.
                                      2-15
        July 1998

-------
Principles of Environmental Impact Assessment Review
Facilitator's Manual
                                         2-16
          July 1998

-------
Principles of Environmental Impact Assessment Review
                                                               Facilitator's Manual
  SESSION 3: REVIEW APPROACH FOR OVERALL ENVIRONMENTAL IMPACT
                    ASSESSMENT DOCUMENT AND SCOPING
                                                         2 hours and 5 minutes
                                                         Group discussion
                                                         Small group exercise
MATERIALS:                                TIME:
Flipcharts:   2-6 Environmental Impact       SETTING:
             Assessment Document Contents
             3-1 Road Map for Overall
             Environmental Impact Assessment Document Review (1)
             3-2 Road Map for Overall Environmental Impact Assessment
             Document Review (2)
             3-3 Road Map for Scoping Review
             3-4 Tools and Techniques
             3-5 Advice to Reviewers

Handouts:    3-1 Supplemental Table of Contents for Case Studies
             3-2 Instructions for Overall and Scoping Review

Other:       Case Studies
             Resource Manual (e.g., 1.3.3; 1.3.4; 1.5.1; 1.5.2; 1.5.3; and 2.2)
 TEXT:
 3.4   Reviewer's Role in Each Element of the Environmental Impact Assessment Process
 3.4.2  Scoping:  Environmental Impact Assessment Document Development
 4.1.1  Reading an Environmental Impact Assessment: What to Look for
 PURPOSE:   • To develop approaches to overall review
              • To practice overall review
              • To develop approaches to scoping review
              • To practice scoping review
 TIME BREAKDOWN:
 Part A  Introduce Case Studies
 Part B  Approach to Overall Review
 Part C  Identifying Significant issues: Scoping
 Part D  Overall and Scoping Case Study Review
        (Break Included)
 Part E  Report on Overall and Scoping Review
 Part F  Tools and Techniques and Advice to
        Reviewers
                                             Group Discussion
                                             Group Discussion
                                             Group Discussion
05 minutes
10 minutes
10 minutes
                                             Individual/Group Exercise  75 minutes
                                             Group Discussion          15 minutes
                                             Group Discussion
10 minutes
                                       3-1
                                                                        July 1998

-------
Principles of Environmental Impact Assessment Review
Facilitator's Manual
NOTE: THE FLEPCHARTS "ENVIRONMENTAL IMPACT ASSESSMENT DOCUMENT CONTENTS" AND
"WHAT is A GOOD REVIEW" SHOULD BE UP ON THE FLIPCHART STANDS FROM THE LAST SESSION
AND USED AS REFERENCES DURING THE NEXT SESSION IF NEEDED (I.E., WHERE IS SCOPING FOUND).
ALSO, IT IS NECESSARY TO KEEP FLIPCHART #3-1 "ROAD MAP FOR OVERALL ENVIRONMENTAL
IMPACT ASSESSMENT DOCUMENT REVIEW" COVERED UNTIL YOU ARE READY TO USE IT.

PART A.   Introduce Case Studies (Group Discussion, 5 min.)

    What is a reviewer without something to review? I have before me four (#?) different draft
    environmental impact assessments for a range of different project types.   They include:
    [NUMBER] examples that have been selected from the United States and [NUMBERJ^-ow
    [HOST COUNTRY].

BRIEFLY SUMMARIZE THE SUBJECT OF EACH DRAFT ENVIRONMENTAL IMPACT ASSESSMENT BY
IDENTIFYING THE TITLE AND THE PROPOSED ACTION ASSOCIATED WITH EACH.

    We are going to assign you to one of these draft environmental impact assessment
    documents for the remainder of the course to gain "hands-on experience " reviewing
    environmental impact assessment documents. However, you will be exposed to the broad
    range of situations presented by all of the case studies during discussions among all
    participants when we report out results of our reviews. At the end of the course, you can
    keep the final environmental impact assessments for attffi) case studies for future reference
    to add to your personal library and reference material.

    We ask that you not mark up these draft documents and that you return them to us at the end
    of the course. We will be distributing a full packet of "stick-on " note paper for you to use
    to annotate your draft to help with your review and comment.

    During your successive reviews in different sessions, you will have the opportunity to apply
    the concepts and approaches introduced at the beginning of the sessions.  The
    environmental impact assessments we will be using cover a range of project types, topics
    and issues typically presented to environmental impact assessment reviewers. They are
    neither exemplary environmental impact assessments, nor are they so clearly flawed that
    they would have resulted in an obvious cancellation of the project.  They are realistic for
    what you can reasonably expect to encounter.

PART B.    Approach  to Overall Review (Group Discussion, 10 min.)

    Before I distribute and assign draft environmental impact assessment documents, we are
    going to discuss:
       I) how a reviewer can conduct cm "overall" review; and
                                        3-2
         July 1998

-------
Principles of Environmental Impact Assessment Review	Facilitator's Manual

       2) haw a reviewer can review whether "scoping" was carried out properly.

    You will then have an assignment that will help you to get acquainted with your documents.

    Let's first discuss what is involved in reviewing the overall document.

REMOVE THE "WHAT is A GOOD REVIEW?" FLIPCHART FROM LAST SESSION AND POST IT ON THE
WALL.  TITLE A BLANK FLIPCHART "APPROACHES TO OVERALL REVIEW."

PICK UP ONE OF THE ENVIRONMENTAL IMPACT ASSESSMENTS.

     •   How can you approach the overall review, that is, after you weigh it, touch and feel it,
        to see how hot the issues and impacts are? What might you look at when you open it up
        and start to review the document?

RECORD RESPONSES ON THE FLIPCHART.

        Possible responses:  - Table of contents, how is it organized?
                          - Who prepared it?
                          - What is the context of my review?
                          * Does it follow an appropriate format or structure?
                          - Are all the referenced materials included?
                          - What is the main focus of the proposed project?
                          - Does it appear to cover the expected elements and issues?
                          - Are potentially significant issues identified?
                          - Are there any obvious omissions?
                          • Who are the interested and affected parties relevant to the
                          proposed project?
                                         3-3                                July 1998

-------
Principles of Environmental Impact Assessment Review
Facilitator'sManual
    »   After you have become oriented with the document's structure and contents, what
        specific questions do you need to consider to plan your detailed review?

        Possible responses: - What type of management plan do I need?
                         • What additional information or resources do I need to conduct the
                           review?
                         - Are there individuals who I need to involve in the review due to
                         the need for specialized expertise?
                         - Are there opportunities to become proactively involved with the
                          proposed project?
                         - How am I expected to communicate the results of my review?
                         -To whom am I communicating my analysis?
                         - How much time I have for the review?

    •  Is it appropriate for you to document any of your observations and analyses at this point
       in the review? How could documentation of your thoughts at this point be helpful during
       the detailed review?

       Possible responses:  - To keep track of the key issues as I read through a complex
                         document
                         - Elements of the document (e.g., environmental impact,
                         mitigation) that might not address the key issues at all
                         - Questions that I have from my overall review.

ENCOURAGE PARTICIPANTS TO REALIZE THE VALUE OF BEGINNING THE DOCUMENTATION PROCESS
FROM THE BEGINNING OF THE REVIEW AND TO AMEND AS MORE DETAILED ANALYSIS IS
CONDUCTED.

    The process you have described and questions you have considered are important to
    remember when conducting your overall review of the document.  They provide a framework
    for your detailed review of each element of the environmental impact assessment.

REMOVE THE "ENVIRONMENTAL IMPACT ASSESSMENT DOCUMENT CONTENTS" FLIPCHART AND
POST IT ON THE WALL. THIS SHOULD REVEAL FLIPCHART #3-1 (ROAD MAP FOR OVERALL
ENVIRONMENTAL IMPACT ASSESSMENT DOCUMENT REVIEW (i)). UNDERNEATH FLIPCHART #3-1
IS FLIPCHART #3-2 (ROAD MAP FOR OVERALL ENVIRONMENTAL IMPACT ASSESSMENT DOCUMENT
REVIEW (2). REMOVE FLIPCHART # 3-2 AND PLACE IT ON THE OTHER STAND SUCH THAT FLIPCHART
#3-1 IS ON THE LEFT STAND AND FLIPCHART #3-2 IS ON THE RIGHT STAND. THEYARETOBE
VIEWED SIMULTANEOUSLY.
                                       3-4
        July 1998

-------
Principles of Environmental Impact Assessment Review	Facilitator's Manual

    When developing this course, we asked a group of experienced environmental impact
    assessment reviewers the same questions we have just discussed This list represents a
    summary of the different approaches they used when conducting an overall review of an
    environmental impact assessment document. We have called it a "road map for overall
    review of an environmental impact assessment document."  The concept of a "road map"
    mil be used throughout the course to provide you with enough structure so that you can
    avoid getting lost. Given the size and detail in the typical environmental impact assessment,
    it is very easy to lose sight of what is and is not important.

    Let us look at this prepared road map and see how it compares with the points you came up
    with yourselves.

RECORD PARTICIPANT ADDITIONS AND MODIFICATIONS TO THIS PREPARED FLIPCHART.

    / will post this road map (and the others we create) for your use during the review of your
    case studies. It can also be found in Section 4.1.1 of your Student Text along with other
    materials regarding the role of the reviewer.  We will be referring to those materials as we
    move through the course.

REVIEW EACH OF THE ITEMS IN THE LIST.

POINTS TO MAKE:

    Review tables of contents and executive summary: You can learn a lot from a table of
    contents and from an executive summary. Reading both and thinking about the key issues
    you think will apply to the proposed project, prior to wading into the bulk of the document
    itself, can help you avoid being sidetracked by great detail on marginally important issues.

    Scanning:  // is generally useful to get some overall understanding of a document before you
    try to analyze it in detail. In conducting an overall review, try to develop an understanding
    of the proposed project, who and what would be affected by the proposed project, the major
    concerns, major impacts, and major issues with the document.

    Review of each successive element of the environmental impact assessment process: We will
 •   be reviewing each successive element during the course and then have an opportunity to
    employ all of these approaches in an integrated way on the third day when we review the
    draft environmental impact assessment in its entirety.

    Use of Checklists: Use of checklists is another important way to stay focused on what is
    important. A useful review checklist can be found in Appendix A to the Student Text.  We
    will also be distributing topic-specific checklists to you throughout the course.
                                          3-5                                  July 1998

-------
Principles of Environmental Impact Assessment Review
Facilitator's Manual
    Logic and consistency:  Even -when looking at an environmental impact assessment for the
    first time, it can be very valuable to check for logic and consistency within the document.
    For example, if the proposed project has the potential to cause damage to an important
    natural area, is there an emphasis on those impacts and possible mitigation measures in the
    assessment?

    Systematic approach: During overall review, try to identify areas where the assessment is
    incomplete or inadequate, where the significance of the proposed project is unsupported,
    unclear, or simply ignored, and where there is a lack of integration between related parts of
    the assessment.

    Perspectives of interested and affected parties: Both project proponents and reviewers have
    their own personal opinions and biases. It is important to work hard to identify and
    understand the perspectives of all interested and affected parties.

    Compare document to other environmental impact assessments: One of the best ways to
    learn a lot about a document during overall review is to compare it to other environmental
    impact assessments, especially those written for similar projects. Are there any obvious
    omissions or additions from one to another? Why?

    Supporting decision-making: The ultimate purpose of conducting an environmental impact
    assessment is to support the decision-making process. Ask yourself: will the document you
    are reviewing do that?  What would need to change to make it more supportive of the
    decision-making process?

PART C.   Identifying Significant Issues: Scoping (Group Discussion, 10 min.)

    In the previous exercise, we gained a general knowledge and idea about the environmental
    issues associated with the project. Now we will begin to look at the document in greater
    detail.  Identifying significant issues is part of the purpose of scoping so documentation of
    scoping is particularly useful to reviewers. It may also  be an element which needs to be
    reviewed.

    •   Can anyone remind us what scoping is?

POINT TO SCOPING ON THE ENVIRONMENTAL IMPACT ASSESSMENT FLOWCHART.

    Scoping is the process of identifying what needs to be included in an environmental impact
    assessment and at what level of detail. It involves determining the range of issues to be
    addressed, the significance of these issues, and which issues can be eliminated if they are
    not potentially significant.  The scoping portion of the document, if it is a separate section,
    should:
                                          3-6
         July 1998

-------
Principles of Environmental Impact Assessment Review
                                          Facilitator's Manual
       1) Provide an overview of what is potentially significant and what is not;
       2) Identify the stakeholders
       3) Identify what impacts will be assessed and the geographic area to be assessed;
       4) Identify the alternatives that will be considered.

    Above all, scoping should bring the proposed project into focus. Scoping may or may not
    involve some,level of public participation or inquiry involving stakeholders; and, as we
    discussed earlier, it may or may not involve the reviewer.

    We -want to cover all of the contexts for review, so let's discuss in-turn:

    • First, where scoping is legally required and subject to public or agency review through
       documentation in the environmental impact assessment document

    + Second, where scoping is required to be part of the process, but need not be documented

    • Third, where scoping is not specifically required or documented.

POINT OUT THE LEGAL CONTEXT AGAIN AND NOTE THAT BEFORE A REVIEWER BEGINS HIS OR HER
JOB, THE ABOVE IS THE KIND OF CONTEXT INFORMATION THAT HE OR SHE SHOULD HAVE.

    Let's first discuss what a reviewer might look for if scoping is a specific requirement of
    environmental impact assessment. Let's use our list for the focus of environmental impact
    assessment review and go through it.

REFER TO THE "REVIEWER'S Focus" FLIPCHART (#2-5) FROM SESSION 2.

    *  If scoping is required and should be documented, then what should the reviewer consider
       to ensure it was complete?

USE A BLANK FLIPCHART TITLED "APPROACHES TO SCOPING REVIEW" TO RECORD DISCUSSION ON
THINGS TO CONSIDER TO DETERMINE COMPLETENESS.
       Possible responses:
- Scoping conducted and documented
- All of the potentially significant issues identified
- Process to identify issues as significant documented
- Issues that are potentially less significant identified
- Potentially significant issues the same as the ones the reviewer
identified during overall review
- All of the interested and affected parties are identified
- Omissions (e.g., issues, interested parties), if any, are identified
                                          3-7
                                                   July 1998

-------
Principles of Environmental Impact Assessment Review
Facilitator's Manual
     *  In what ways might the scoping portion of an environmental impact assessment document
       be inadequate?

       Possible responses:   - Key issues not brought into focus
                           - Important stakeholders not identified/consulted
                           - Significant issues and impacts ignored or inadequately addressed
        (e.g, the human environment or the natural environment insufficiently addressed)
                           - Insignificant issues not identified or a justification not provided to
                            support their dismissal
                           - Geographic area not adequately identified or described
                           - Insufficient detail to define the spatial and temporal scope of
                           analyses required for each resource
                           - Sufficient range of alternatives not considered.

     •   What would a reviewer look for if scoping is not required, or not required to be
        documented?

     Usually, some scoping is done to prepare an environmental impact assessment even if not
    required.  However, it may be incomplete or inadequate.  One of the jobs of the reviewer, as
    we discussed earlier, is to ensure that the perspectives of all of the stakeholders are taken
    into account in the assessment that is conducted If scoping is not required or is not
    documented, it is important for reviewers to identify for themselves all of the stakeholders
    and to incorporate their perspectives in the review.

     *   What other things might you want to know about the context for your review of scoping?
        Possible responses:  - Legal considerations for what will be required to be done and
                           what must be documented
                           - Institutional or organizational requirements expressed in policy
                           statements or guidance that encourage a certain approach or level
                           of detail
                           - Personal needs to learn more about how scoping activities are
                           planned and conducted.

    Let us see how your thoughts on scoping review compare with those of other environmental
    impact assessment reviewers.

POST FLIPCHART #3-2 IN A LOCATION WHERE ALL OF THE ROAD MAP FLIPCHARTS FROM SESSIONS
3-10 CAN BE POSTED AND EASILY REFERENCED BY THE PARTICIPANTS AND FACILITATORS IN
DURING SUBSEQUENT BREAK OUT SESSIONS.
                                          3-8
         July 1998

-------
Principles of Environmental Impact Assessment Review	Facilitator's Manual

REVEAL FLBPCHART #3-3, ROAD MAP FOR SCOPING REVIEW. READ EACH ELEMENT TO THE
PARTICIPANTS.

    •   Haw does our list compare to theirs?

AMEND THE FLIPCHART WITH ANY ADDITIONAL IDEAS.

    This Road Map, as well as further information about overall environmental impact
    assessment review, can be found in your Student Text in Section 4.1.1.

PART D.   Overall and Scoping Case Study Review (Individual Review, 45 min./ Small
            Group Review, 30 min., break included)

    Now we 're going to give you a chance to put some aspects of the two road maps we have
    discussed in this session into practice by conducting a brief review of your assigned
    environmental impact assessment document by I) scanning it for significant issues, and 2)
    reviewing how scoping was done by thepreparer of the environmental impact assessment.

    The small groups that are established during this session will be used for the next several
    sessions, sessions 3 through 8. If anyone would strongly prefer an experience in a
    particular topic, or if the selection process has distributed expertise inequitably, we can
    arrange to switch assignments among particular individuals so we do not create an
    imbalance in the group sizes or areas of expertise. Also, I want to encourage those of you
    who work closely together on a regular basis to have an opportunity to get to know others in
    the course by taking on different environmental impact assessment case studies.

    We will use a similar structure for each case study review in this session and in the sessions
    during the next two days. For each topic, we will discuss a particular component of the
    environmental impact assessment analysis and documentation.  We will then develop
    approaches to reviewing the environmental impact assessment document for that
    component, and review our road map and any relevant tools and techniques.  Using our
    case studies and small groups of participants, we will use the approaches we have discussed
    to conduct a review of the documents we have. We will then share our findings and discuss
    the successful approaches used, the range of issues we identified, and what else might be
    observed during the review of this element of the environmental impact assessment
    document.  We will also discuss how our review approach might differ in the different
    situations we find ourselves in as reviewers.

DISTRIBUTE THE CASE STUDY DOCUMENTS SUCH THAT EACH QUARTER OF THE CLASS RECEIVES
ONLY ONE OF THE FOUR CASE STUDIES. ENSURE THAT A ROUGHLY EQUAL NUMBER OF
PARTICIPANTS ARE ASSIGNED TO EACH OF THE FOUR CASE STUDIES.
                                         3-9                                July 1998

-------
Principles of Environmental Impact Assessment Review
Facilitator's Manual
DISTRIBUTE HANDOUT 3-1, SUPPLEMENTAL TABLE OF CONTENTS FOR CASE STUDIES.
DISTOBUTE HANDOUT 3-2, INSTRUCTIONS FOR OVERALL AND SCOPING REVIEW.

    lam also handing out an outline of each of the documents to help you locate relevant
    materials for this and future exercises. I am also handing out instructions for this session.

    First, I would like you to gather into small groups of individuals that have been given the
    same case study.

EACH OF THE CASE STUDY GROUPS SHOULD BE ASSIGNED A CORNER, OR SECTION, OF THE ROOM TO
GATHER AROUND. EACH AREA SHOULD BE PROVIDED WITH A FLIPCHART EASEL, FLIPCHART PAPER,
AND MARKERS. DIRECT THE PARTICIPANTS TO THE APPROPRIATE SECTION OF THE ROOM FOR THEIR
CASE STUDY.

    Since you mil be working in these groups'for at least the next two days, you should move all
    of your materials with you so you have access to all necessary references.

    For the next 45 minutes, I would like you to individually review the environmental impact
    assessment document that you were provided. Your goal should be to get a general sense of
    the whole document and to identify the potentially significant issues posed by the proposed
    project and adequacy of scoping; try not to focus exclusively on one section for all of the
    available time. For the purposes of the scoping review you are about to conduct, let's
    assume that scoping is a required element and that it must be documented in the review.

    You then will have 30 minutes to conduct this review in your small groups. You will need to
    do several things during that time.  First, your small group will need to gather together to
    discuss your observations and questions, and share your ideas. Second, your small group
    will need to prepare a group report. A consensus of major points you want to make about
    your review of this element.  A full consensus may not be reached on all issues, and
    alternative points of view should be welcomed and also considered as part of the report.
    Does anyone have any questions?

ANSWER ANY QUESTIONS THE PARTICIPANTS HAVE ON THE PROCESS THEY ARE TO FOLLOW.

    Handout # 3-2 has the basic steps you are to follow during this review and the key
    questions your report should address:

    •  What do you think are the significant environmental issues posed by this proposed
      project?

    •  Was scoping addressed?
                                        3-10
         July 1998

-------
Principles of Environmental Impact Assessment Review	Facilitator's Manual

    • Are the major issues identified? Which ones were ignored?

    * Were the issues you identified the same as the ones identified in the document?

    • Are less significant issues identified?

    • Who has been identified as an interested or affected party?

    • Were there any obvious omissions in issues identified? In the parties identified?

    It is now  	.  You and your small groups will have until	(75 minutes from now) to
    review this component of the environmental impact assessment, discuss your observations
    and questions, and prepare your reports. You should use the  "Road Map " we created to
    help guide your review and the topics and issues you consider. J will announce when 45
    minutes have passed so you will know when you should be moving into your small groups to
    structure your remaining time.

INFORM PARTICIPANTS THAT THEY MAY TAKE A BREAK AT THE END OF THEIR INDIVIDUAL REVIEW,
IF TIME REMAINS, BEFORE THE SMALL GROUP REVIEW.

DURING THE ACTIVITY, YOU SHOULD DO THE FOLLOWING THINGS:

•   MONITOR TIME AND EITHER MAKE VERBAL ANNOUNCEMENTS OF OR POST THE TIME
    REMAINING

•   CIRCULATE TO ENSURE SMALL GROUPS FOCUS ON OVERALL AND SCOPING REVIEW
•   CLARIFY ANY CONFUSION THE PARTICIPANTS HAVE ABOUT THE INSTRUCTIONS OR THE REVIEW
    PROCESS

•   DETERMINE THE ORDER OF THE SMALL GROUP' s REPORT PRESENTATIONS

•   TEN MINUTES BEFORE THE END OF THE ACTIVITY, ANNOUNCE THE TIME REMAINING '

•   FIVE MINUTES BEFORE THE END OF THE ACTIVITY, DIRECT EACH GROUP TO ELECT A
    SPOKESPERSON.

PART E.   Report on Overall and Scoping Review (Group Discussion, IS min.)

    // is time to re-convene and discuss the results of your overall review and your review of
    scoping.  We are going to have each group BRIEFLY summarize their major findings from
    reviewing their document.  Each group should present for no more than THREE MINUTES.
    We are just trying to get a basic idea of your findings here.

                                       3-11                               July 1998

-------
Principles of Environmental Impact Assessment Review
Facilitator's Manual
HAVE EACH GROUP PRESENT THEIR FINDINGS FOR UP TO THREE MINUTES. ENCOURAGE THE
PARTICIPANTS TO ASK QUESTIONS FOLLOWING EACH REPORT.

    •   Even in this short period of time, how well were you able to develop an initial sense of
        significant issues? What was most useful to you in doing that?

    •   Were the road maps helpful? Did anyone use or refer to them? Haw -wouldyou modify
        them to better reflect your approach to the review?

UPDATE ROAD MAPS BASED ON PARTICIPANT COMMENTS.

    •  What do your observations about the scoping element mean to you as a reviewer? How
       will your scoping review aid your review of the remainder of the document?

       Possible responses:  - Identification of interested and affected parties
                          - Identification of significant issues.

    •  How will the documentation you have begun be useful for the remainder of the review?

       Possible responses:  - Follow key themes throughout the document
                          - Ensure that issues identified here are adequately addressed later
                          - Ensure that parties identified here are adequately considered later
                          - Identify how significant issues identified here are supported by the
                            analysis throughout the document.

PART F.    Tools and Techniques and Advice to Reviewers (Group Discussion, 10 min.)

    In addition to introducing a road map for each element of review, we are also going to
    introduce tools and techniques that can be used to help you conduct environmental impact
    assessment review, including review of scoping.  There are a number of tools and techniques
    that can be used to help determine if an environmental impact assessment document is
    complete, adequate, of sufficient  quality, focused on significant issues, preserves the
    integrity of the process, etc. Each reviewer develops and uses his or her awn most effective
    tools and techniques for environmental impact assessment review during the course of their
    career. There are many different tools in the tool box. Any one person will apply some or
    all depending upon personal preference and the nature of the environmental impact
    assessment. However, there are certain tools and techniques that have been found to be
    particularly effective.

REVEAL FLIPCHART # 3-4 (TOOLS AND TECHNIQUES).
                                         3-12
         July 1998

-------
Principles of Environmental Impact Assessment Review                   Facilitator's Manual

    Checklists or narrative guidance can be particularly useful for scoping. Please turn to page
    2.2-1 in the Resource Manual.

    In addition to.checklists, reviewing other environmental impact assessment documents to see
    what was done in different scenarios is also very helpful.

    • How can you ensure the integrity of your review?

      Possible responses:   - Keeping notes and investigating questions and issues
                          - Following requirements, policy, and guidance consistently
                          throughout the document
                          - Reviewing other review documents to see how findings were
                          expressed

    Requirement, policies, checklists, and other documents are items that you will need to
    assemble for your specific use in reviewing documents. Throughout the course, we mil
    introduce you to some specific tools such as checklists for review of certain elements of
    environmental impact assessment documents, or memos and issue papers that identify a
    range of possible circumstances, considerations, and outcomes. Use the road map we
    developed earlier to focus your evaluation. Afterwards we will discuss the value of
    developing tools specific to your circumstances that suit the needs of your reviews.

POST THE TOOLS AND TECHNIQUES FLIPCHART so IT WILL BE VISIBLE THROUGHOUT THE COURSE.

LEAD A DISCUSSION ON THE DIFFERENT REQUIREMENTS, POLICIES AND GUIDANCE THAT MIGHT BE
APPLICABLE FOR THE REVIEWER AND HOW THEY MIGHT ASSEMBLE THESE DOCUMENTS. ALSO
DISCUSS OTHER VALUABLE TOOLS SUCH AS CHECKLISTS AND ASK WHAT TYPES OF QUESTIONS THEY
MIGHT INCLUDE ON A CHECKLIST TO ENSURE THEIR OWN CONSISTENCY, OR THEIR CONSISTENCY
WITH OTHER REVIEWERS.

    The Tools and Techniques flipchart can also be found in Section 4.2.1 of the Student Text.

CLOSE THE DISCUSSION WITH A REVIEW OF THE MATERIALS INCLUDED IN THE RESOURCE MANUAL
FOR THE COURSE.  SOME INFORMATION THAT MAY BE INCLUDED ARE DOCUMENTS OR MEMOS ON
THE CONDUCT OF SCOPING AS PART OF THE ENVIRONMENTAL IMPACT ASSESSMENT PROCESS
                                        3-13                                July 1998

-------
Principles of Environmental Impact Assessment Review
Facilitator's Manual
1.3.3  TECHNIQUES FOR COMMUNICATING WITH THE PUBLIC
1.3.4  IDENTDFICATION OF ISSUES
1.5.1  SCOPING
1.5.2  CEQ SCOPING GUIDANCE     .
1.5.3  DEFINING THE SCOPE OF ALTERNATIVES IN AN ENVIRONMENTAL IMPACT STATEMENT
      AFTER CITIZENS AGAINST BURLINGTON
2.2   ENVIRONMENTAL IMPACT ASSESSMENT EVALUATION CHECKLIST

DISCUSS HOW THIS TYPE OF INFORMATION MAY BE USEFUL TO A REVIEWER TO UNDERSTAND THE
DIFFERENT CONSIDERATIONS THAT HAVE BEEN MADE WHILE CONDUCTING THE ANALYSIS AND
DEVELOPMENT OF THE DOCUMENT.

Advice to Reviewers

    Now were going to spend a few minutes talking about some "lessons learned" for this
    session, such as what to watch out for in scoping review.

REVEAL FLIPCHART # 3-5 (ADVICE TO REVIEWERS).

    First, I would like you to give me your ideas on what kinds of things you would tell other
    reviewers to "watch out for" when reviewing this element of an environmental impact
    assessment document. Those that go beyond what we covered in our road maps we will add
    to our "Advice to Reviewers " list. We begin this list now, and will add to it during each
    session.

LEAD THE DISCUSSION TO IDENTIFY THE THINGS THAT CAN POSE PROBLEMS FOR AN
ENVIRONMENTAL IMPACT ASSESSMENT DOCUMENT REVIEWER. RECORD THE PARTICIPANTS'
COMMENTS ON THE FLIPCHART. REFER FREQUENTLY TO THE ROAD MAP AND THE "REVIEWER'S
FOCUS" FLIPCHART FROM SESSION 2.

    Now I would like to ask you how you think your review of scoping would have gone in each
    of the other review situations we discussed earlier. Specifically,

    • What if you had been in a position to be a proactive reviewer? What if the project
      proponent had come to you, or you to them, early in the process — say, prior to scoping.
      What if you were able to make suggestions about the scope of the proposed project, and
      to discuss scoping with them?

    • What resources or sources of information would you have wanted to conduct your review
      if you were to be empowered?
                                       3-14
         July 1998

-------
Principles of Environmental Impact Assessment Review	Facilitator's Manual

    •  Think about what organizations and experts you would have -wanted to engage in the
       review process with you if you were in the position of a "lead" reviewer? You will have
       an opportunity to engage as a lead reviewer in Session 8.

GET PARTICIPANTS THINKING ABOUT THESE DIFFERENT REVIEWER SITUATIONS. DONOT RECORD
RESPONSES ON A FLffCHART.

    // is important to think about these different reviewer scenarios, because you may find
    yourself in any or all of them for different projects or at different points in your career.

INTRODUCE THE FACILITATOR WHO WELL LEAD THE PARTICIPANTS THROUGH THE NEXT SESSION,
REVIEWING AN ENVIRONMENTAL IMPACT ASSESSMENT DOCUMENT FOR PURPOSE AND NEED AND
ALTERNATIVES. ANNOUNCE THE BREAK AND THE STARTING TIME FOR SESSION 4 AND ANY OTHER
NECESSARY LOGISTICAL ARRANGEMENTS OR COMMENTS.

    We are now ready to go to the first element of the documentation and analysis —purpose
    and need and, related to this, the alternatives of the proposed action. [NAME OF
    FACILITATOR] will lead us through this.
                                       3-15                               July 1998

-------
Principles of Environmental Impact Assessment Review
Facilitator's Manual
                                        3-16
         July 1998

-------
Principles of Environmental ImpaciAssessment Review
                                                                 Facilitator's Manual
       SESSION 4: REVIEW OF PURPOSE AND NEED AND ALTERNATIVES
                                                   TIME:  1 hour and 55 minutes
                                               SETTING:  Group discussion
                                                           Small group exercise
MATERIALS:
Flipcharts:   4-1 Project/Purpose and Need/
             Alternatives
             4-2 Alternatives
             4-3 Road Map for Purpose and
             Need and Alternatives Review (1)
             4-4 Road Map for Purpose and
             Need and Alternatives Review (2)
 Handouts:   4-1 Instructions for Purpose and Need and Alternatives Review

 Other:       Case Studies
              Resource Manual (e.g., 1.3.1; 1.3.2; 1.3.5; 1.5.3)
 TEXT:
 2.2.2  Development of Alternatives
 2.2.3  Assessment
 4.2   Purpose and Need
 4.3   Project Alternatives
 PURPOSE:  • Learn to evaluate the purpose and need statement
              • Learn to evaluate the adequacy of project alternatives
              • Learn to evaluate the project description
              • Apply concepts to actual Environmental Impact Assessments
 TIME BREAKDOWN:
 Part A  Key Review Concepts: Project Descrip-
         tion, Purpose and Need, and Reasonable
         and Feasible Alternatives
 Part B   Review for Appropriate Alternatives
 Part C   Introduction to Reviewer's Road Map
 Part D  Purpose and Need and Alternatives
         Review Exercise
 Part E   Report-out on Purpose and Need and
         Alternatives
 Part F   Session Wrap-Up
 Part G  Day 1 Wrap-Up
                                          Group Discussion             15 minutes
                                          Group Discussion             10 minutes
                                          Group Discussion             10 minutes
                                          Small Group Exercise         45 minutes
                                          Reports from Small Groups    15 minutes
                                          Group Discussion             10 minutes
                                          Group Discussion             10 minutes
                                        4-1
                                                                          July 1998

-------
Principles of Environmental Impact Assessment Review
Facilitator's Manual
PART A.   Key Review Concepts: Project Descriptions, Purpose and Need, and
            Reasonable and Feasible Alternatives (Group Discussion, 15 min.)

    We are now going to walk through the environmental impact assessment document, focusing
    our review on selected elements of the analysis and documentation.

REFER TO THE ENmoNMENTAL IMPACT ASSESSMENT PROCESS FLOWCHART.

    Let us focus first on documentation of Purpose and Need, as well as alternatives to a
    proposed project. Together, the Purpose and Need section of an El A typically makes up the
    first chapter of an environmental impact assessment document.  Closely related are the
    Project Description and Alternatives discussions, often the second chapter of an
    environmental impact assessment document. The proposed project and its alternatives
    should be designed to meet the identified need, and the identified need should be sound.  A
    clear description of the proposed project and alternatives is necessary for conducting a
    review of the environmental impact assessment to support an informed decision regarding
    the proposed project.

    For the remainder of this afternoon, we will discuss how to approach reviewing these
    chapters of an environmental impact assessment document: Purpose and Need, Project
    Description, and Project Alternatives. We also will practice what we discuss using our
    assigned case studies.

    First, let us be certain we all have a common understanding of what we mean by purpose
    and need and alternatives to a proposed project and why a reviewer of environmental
    impact assessments needs to pay attention to them.

    • Let us begin by using examples. I need two types of projects that you have either worked
      on or heard about that might involve environmental impact assessment?

LIST PROJECTS ON FLIPCHART 4-1 (TITLED "PROJECT/PURPOSE AND NEED/ALTERNATIVES "), LIMIT
TO TWO AND AVOID REPETITION IN TYPES OF PROJECTS. BEGIN BY LISTING 2 OR 3 PROJECTS (E.G.,
DAM, ROAD, HOUSING DEVELOPMENT) ON THE FLIPCHART AND THEN CARRY THROUGH THE
DISCUSSION ON PURPOSE AND NEED ON EACH ONE SEQUENTIALLY.

        Possible Responses:   Dam
                            Highway
                            Airport
                            Power Plant
                            Harbor
                            Mine.
                                         4-2
         July 1998

-------
Principles of Environmental Impact Assessment Review	Facilitator's Manual

BEGIN WITH THE FIRST PROJECT AND IDENTIFY TWO OR THREE DIFFERENT PURPOSES AND NEEDS
FOR IT, THEN IDENTIFY TWO DIFFERENT ALTERNATIVES FOR EACH PURPOSE AND NEED.

    •  Now let's begin with the Purpose and Need. What could the Purpose and Need have
      been?  What about alternatives for meeting each purpose and need?

RECORD RESPONSES ON THE FLIPCHART.  REPEAT FOR THE SECOND PROJECT.

REFER TO THE ENVIRONMENTAL IMPACT ASSESSMENT PROCESS FLOWCHART.

    Early on, before an environmental impact assessment document is produced, someone
    identifies a problem or opportunity for a proposed project; that is, this per son or
    organization determines there is a need and specific purpose for the proposed project.  A
    clear statement by the project proponent regarding this need is fundamental to the
    remainder of the environmental impact assessment document and consequently should be
    evaluated closely by the reviewer.

FACILITATE A DISCUSSION:

    •  What happens in actual practice? Do projects ever get proposed without a clear
       "purpose and need"?  (OFFER WITH A BIT OF HUMOR, SINCE IT IS ALL TOO OFTEN).

    // can and does happen that projects are proposed without a clearly defined purpose and
    need. Perhaps they are "wishedfor development opportunities," or "assumptions" about
    the future on someone 'sport.

TITLE A BLANK FLIPCHART "PURPOSE AND NEED AND ALTERNATIVES"

    * How or why should this concern the reviewer?  Why do you think it is important for a
      reviewer to make sure that the environmental impact assessment clearly defines the
      purpose and need for an proposed project?

      Possible responses:   - To provide a basis for determining impacts
                          - To provide a basis for defining alternatives
                          - To demonstrate understanding of the context  of the proposed
                         . project
                          - To prevent projects unsupported by sound economic or social
                          needs from causing avoidable adverse social and environmental
                          impacts.

      •    What do you think should be included in the description of the purpose and need
           for a proposed project?

                                         4-3                                 July 1998

-------
Principles of Environmental Impact Assessment Review
                                         Facilitator's Manual
       Possible responses:    - A statement of why the proposed project is necessary
                           - A statement of what the proposed project is
                           • A description of who or what groups would benefit from the
                           proposed project and how they would benefit
                           - An indication of how and when the proposed project would be
                           completed.

FACILITATE A DISCUSSION OF THE PROJECT DESCRIPTION

    •  What about the project description? The description of the proposed project explains how
       the proposed project meets the purpose and need. It also provides information critical to
       the evaluation of impacts.  What kinds of things would we want to know?  What are the
       necessary elements of a project description?

USING A BLANK FLIPCHART, RECORD THE TYPICAL COMPONENTS OF A PROPOSED PROJECT
DESCRIPTION
       Possible responses:
- An area map showing the proposed project site and surrounding
land use and natural features
- A site map showing property boundaries, location, and purpose of
all structures
- A detailed description of proposed project activities in different
phases, including construction, operation, and closure, as well as
the locations/areas and time frames over which these activities will
take place
- A description of materials flow.
DISCUSS HOW THIS INFORMATION PROVIDES CLUES TO THE REVIEWER REGARDING THE
DESCRIPTION OF THE ENVIRONMENTAL SETTING AND IMPACTS.

    •  What about checking to see if the proposed project meets the stated purpose and need?

    At times there are valid needs, and at other times it may be someone's pet project but have
    no valid need, and the reviewer should draw a distinction between the two.

PART B.   Review for Appropriate Alternatives (Group Discussion, 10 min.)

    We have reviewed why a clear description of a proposed project and the underlying purpose
    and need are important, and what a reviewer should look for. Let us talk more specifically
    about alternatives and what it means to a reviewer for an environmental impact assessment
    to be complete, and adequate.
                                         4-4
                                                   July 1998

-------
Principles of Environmental Impact Assessment Review                    Facilitator's Manual

    In the environmental impact assessment process, alternatives are those reasonable, feasible
    activities which satisfy the purpose and need of a proposed project.

    •  If a proposed project satisfies a purpose and need, why should we look at alternatives?
       What are the benefits of evaluating alternatives in the environmental impact assessment?
         >
USING A BLANK FLIPCHART, RECORD ELEMENTS OF THE DISCUSSION ON THE "BENEFITS OF
EVALUATING ALTERNATIVES"

       Possible Responses:    - Selection of best project design
                             - Selection of best project location
                             - More efficient use of resources
                             - Avoid adverse impacts
                             - Achieve sustainable development goals made possible only
                             through consideration of new ways of doing business.

    Ideally, when someone proposes a project, he or she begins with a statement of the project's
    purpose and need, then they generate alternatives, evaluate alternatives and assess their
    impacts, and come up with the best approach from many different perspectives. This indeed
    is one of the goals of the environmental impact assessment process.  The environmental
    impact assessment process is designed to enable decision-makers to consider alternatives in
    an explicit way in the hopes that different perspectives offered through stakeholder
    involvement can also be weighed in the decision and systematically considered in a rigorous
    environmental impact assessment.

    Without alternatives, the decisions to be made are limited to opportunities to mitigate
    adverse impacts, or to be able to plan in advance for infrastructure needs.  Without
    considering alternatives, we cannot achieve the full benefits of the environmental impact
    assessment process.

    While it is important to include alternatives, in many countries the inclusion of alternatives
    is not mandatory. I would like you to hold the question of whether this means that the
    government reviewer cannot or does not consider alternatives.

    • Let us start with the question of what a reviewer would look for if identification of
      alternatives were required. Then we will follow with a discussion of what a reviewer
      might look for if alternatives were not required.

LET PARTICIPANTS DISCUSS THE FOLLOWING QUESTIONS BRIEFLY.  BE  SURE TO EMPHASIZE THE
POINTS WHICH FOLLOW EACH QUESTION.
                                          4-5                                  July 1998

-------
Principles of Environmental Impact Assessment Review
Facilitator's Manual
    •  First, what kinds of alternatives might one expect to see in an environmental impact
       assessment?

REVEAL AND REFER TO FUPCHART # 4-2 (ALTERNATIVES).

    •  Can you give me an example of each kind of alternative using one of our projects that we
       had listed earlier as examples?

ALLOW PARTICIPANTS TO PROVIDE EXAMPLES.

    As you can see, there are several kinds of alternatives you may see in a typical
    environmental impact assessment.  It is helpful for a reviewer to anticipate the relevance of
    the range of types of alternatives during the review process.

    •  How many alternatives are enough to make an environmental impact assessment
       complete? How does a reviewer know when an environmental impact assessment
       considers an appropriate number of alternatives?  Is there an appropriate number of
       alternatives?

POSSIBLE PROMPTS: Is FIVE SUFFICIENT? THREE? A HUNDRED? Is rr SUFFICIENT TO HAVE ONLY
ONE ALTERNATIVE?

    The number of alternatives that should be considered depends on the project and setting.
    Sometimes 2 alternatives are enough, but sometimes 200 are needed Regardless of the
    number, the alternatives need to  cover a range of reasonable alternatives.  They do not need
    to be exhaustive, but should represent key points on a spectrum to provide decision makers
    with appropriate information on the nature of the choices being made and their impacts.

    •  In judging whether any of these alternatives may be relevant, is it necessary to have a no-
       action alternative?

ALLOW UP TO THREE RESPONSES.

    This raises two questions, first, whether the no-action alternative is always implicitly before
    the reviewer and government decision maker even when the environmental impact
    assessment document may not explicitly describe the no-action alternative and its impacts.

    Second, whether the no-action alternative should always be present because it establishes a
    baseline of future environmental conditions if the proposed project were not implemented
    The environmental conditions predicted under the "no-action " alternative must be
    compared with the potential impacts of the project and other proposed alternatives.
                                          4-6
         July 1998

-------
Principles of Environmental Impact Assessment Review	;	Facilitator's Manual

    •  What if the environmental impact assessment process does not require consideration of
       alternatives? Is a single alternative, that is, the proposed project, sufficient to make the
       environmental impact assessment complete for the reviewer?

ALLOW UP TO THREE RESPONSES.

    Even if a single proposed project is assessed without explicit consideration of alternatives,
    the reviewing organization almost always has the no-action alternative before it, even if this
    alternative is not explicit  The reviewer must always have that baseline for purposes of
    analyzing the impact assessment and charting possible courses of action if the proposed
    project poses unacceptable environmental risks.

    •  Haw do alternatives relate to mitigation? Is it sufficient for alternatives to consist of
       mitigation measures for the proposed project, or must there be alternatives entirety
       separate from the proposed project?

ALLOW 1 -2 MINUTES OF DISCUSSION.

    In principle, and in most countries with environmental impact assessment processes which
    follow the international framework, there is a great effort to distinguish alternativesfrom
    mitigation. Understandably, that line is sometimes blurred.

    Mitigation focuses on adverse environmental impacts, broadly defined to include both
    natural and human (socioeconomic) environments. Alternatives focuses on different ways of,
    meeting the underlying purpose and need.  Therefore, mitigation for a proposed project
    does not automatically qualify as a viable alternative. We will address mitigation in Session
    7.  It is a particularly important distinction if we have some doubts about our ability to
    mitigate impacts or if the residual impacts are unacceptable.
PART C.   Introduction to Reviewer's Road Map (Group Discussion, 10 min.)

    Let us step back and think about the reviewer. When a reviewer looks at these three
    elements: the project description, documentation of the purpose and need, and identification
    of alternatives, there is automatically a problem for the reviewer. It is a context problem,
    not a technical problem. Who is most responsible for these elements of a proposed project
    and presumably, in possession of most of the expertise?

       Possible responses:    - The project proponent
                           - The reviewer, as early as possible.
                                          4-7                                 July 1998

-------
Princioles of Environmental Impact Assessment Review
Facilitator's Manual
    When a reviewer reviews these components of the environmental impact assessment, it is
    therefore essential that, if he or she finds deficiencies in "purpose and need" or in
    consideration of alternatives, that such findings be well-supported.  Perhaps more important
    than that, they should also be related to concerns over adverse environmental impacts that
    could be avoided.  This is because, in general, there will always be an expectation that
    review of purpose and need and alternatives is outside of the technical expertise of the
    reviewer. Nonetheless, review of purpose and need and alternatives is essential to the
    integrity of the process.  It should be carried out in the same objective and systematic -way
    as review of the remainder of the document.

REVEAL FLIPCHARTS # 4-2 (ROAD MAP FOR PURPOSE AND NEED AND ALTERNATIVES REVIEW (1))
AND # 4-3 (ROAD MAP FOR PURPOSE AND NEED AND ALTERNATIVES REVIEW (2)). PLACE THEM
SIDE-BY-SIDE ON TWO STANDS.

    We have spent most of our time in this session developing ways that a reviewer can
    approach his or her job of determining whether documentation of purpose and need,
    description of a proposed action and identification of alternatives statements are complete
    and adequate. Let's look at our road map.

REVffiW THE CONTENTS OF THE ROAD MAP RlPCHART.

    Based on our discussion thus far, does anyone have anything they would like to add,
    subtract, or question about this road map?

ANSWER ANY QUESTIONS. IF THERE is CONSENSUS TO MAKE CHANGES TO THE ROAD MAP, MAKE
THEM DIRECTLY ON THE FLIPCHART.

    There is a copy of the road map for this element of the environmental impact assessment in
    sections 4.2. J and 4.3. J of the Student Text so that you can use it during review of actual
    environmental impact assessment documents. In fact, you will have the opportunity to use it
    right now in a group exercise.

PART D.   Purpose and Need and Alternatives Review (Small Group Exercise, 45 min.)

    We are going to return to the small groups we used in the last session, and each will review
    one of these four draft environmental impact assessment documents. Please remember to
    focus on the specific chapter or chapters we are asking you to review as part of the activity.
    Otherwise, you will not have time to complete your review.

KEEP FLIPCHARTS # 4-3 AND # 4-4 (ROAD MAP FOR PURPOSE AND NEED AND ALTERNATIVES
REVEW( 1) AND (2)) POSTED FOR THE DURATION OF THE EXERCISE.
                                         4-8
         July 1998

-------
Principles of Environmental Impact Assessment Review	Facilitator's Manual

    As you conduct your review, remember to keep the road map we developed earlier in mind,
    that is, whether the environmental impact assessment document:

    •  Describes the purpose and need of the proposed project

    •  Demonstrates how purpose and need would be met by the proposed project

    •  Adequately describes the proposed project

    •  Considers the full range of alternatives to meet purpose and need
       - No action
       - Alternative sites, designs, controls
       - Structural vs non-structural
       - Reattocation of social costs and benefits
       - Reasonable, feasible
       - Reflective of the range of choices

    •  Preferred alternative satisfies purpose and need better than alternatives with less
       environmental impact

    You will have a total of 45 minutes to conduct this review of the project description, purpose
    and need, and alternatives. You will need to do several things during that time.

       1)  First, your small group will need to determine how much time you will need as
       individuals to review the document, and you will each need to use that time to
       individually review and analyze the document.

       2) Second, your small group will need to convene and discuss your observations and
       questions, and share your ideas.

       3) Third, your small group will need to prepare a group report on major points you want
       to make about your review of this element. Alternative points of view should be
       welcomed and also considered as part of the report. Does anyone have any questions?

DISTRIBUTE HANDOUT #4-1 (INSTRUCTIONS FOR PURPOSE AND NEED AND ALTERNATIVES
REVIEW). ANSWER ANY QUESTIONS THE PARTICIPANTS HAVE ON THE PROCESS THEY ARE TO
FOLLOW.

    // is now	.  Your small groups will have until	(45 minutes from now) to review
    this element  of the environmental impact assessment, discuss your observations and
    questions, and prepare your reports. I will announce when 10 minutes are left so you will
    know how to structure your remaining time.

                                         4-9                                 July 1998

-------
 Principles of Environmental Impact Assessment Review
Facilitator's Manual
 DURING IHE ACTIVITY, YOU SHOULD DO THE FOLLOWING THINGS:

 •   MONITOR TIME AND EITHER MAKE VERBAL ANNOUNCEMENTS OF OR POST THE TIME
    REMAINING;

 •   CIRCULATE TO ENSURE SMALL GROUPS FOCUS ON REVIEWING THE PROJECT DESCRIPTION AND
    PURPOSE AND NEED AND ALTERNATIVES;

 •   CLARIFY ANY CONFUSION THE PARTICIPANTS HAVE ABOUT THE INSTRUCTIONS OR THE REVIEW
    PROCESS;

 •   DETERMINE HOW THE GROUPS WILL REPORT our; AND

 •   TEN MINUTES BEFORE THE END OF THE ACTIVITY, ANNOUNCE THE TIME REMAINING, AND FIVE
    MINUTES BEFORE THE END OF THE ACTIVITY DIRECT EACH GROUP TO ELECT A SPOKESPERSON.

 PART E.   Report on Purpose and Need and Alternatives Review (Reports from Small
           Groups, 15 rain.)

    Okay, it is time to re-convene and discuss the results of your review of purpose and need
    and alternatives.  We are going to have each group BRIEFLY summarize its major findings
   from reviewing the document for project description, purpose and need, and alternatives.
    Each group should present for no more than THREE MINUTES. We are just trying to get a
    basic idea of your findings here. When giving your presentation, please try to focus on
    answering the questions posed by our road map.

HAVE EACH GROUP PRESENT ITS FINDINGS FOR UP TO THREE MINUTES. ENCOURAGE THE
PARTICIPANTS TO ASK (BRIEF) QUESTIONS FOLLOWING EACH REPORT.
DURING REPORT-OUT, ASK GROUPS TO AUGMENT COMMENTS MADE BY THE OTHER REPORT-OUT
GROUPS.

ADVISE EACH GROUP TO BE SURE THAT EACH FLIPCHART HAS AN APPROPRIATE TITLE, NUMBER,
AND OTHER RELEVANT INFORMATION SO THAT IT IS POSSIBLE TO CORRECTLY REFER TO IT LATER
DURING OTHER COURSE EXERCISES OR AFTER THE COURSE IS OVER.

GENERALIZE FINDINGS INTO THE LARGER CONCEPTS DISCUSSED IN THE SECTION BY REFERRING TO
THE KEY CRITERIA IN THE ROAD MAP. HOW WELL DID EACH OF THE ENVIRONMENTAL IMPACT
ASSESSMENTS MEET THESE CRITERIA? REFER TO THE FINDINGS FROM EACH OF THE SMALL GROUPS.
                                     4-10
        July 1998

-------
Principles of Environmental Impact Assessment Review         	Facilitator's Manual
PART F.    Session Wrap-Up (Group Discussion, 10 min.)

    Having had the experience of reviewing these portions of the environmental impact
    assessment, let's review that experience.

    •  First, was the road map helpful? Did anyone use or refer to it? What would you add to
       it now that you undertook the review?

UPDATE THE ROAD MAP FLIPCHART BASED ON PARTICIPANT COMMENTS.

    •  What other portions of the environmental impact assessment document might be relevant
       to reviewing the project description, purpose and need, and alternatives?

    •  What advice would you give to other reviewers to "Watch out for" when reviewing these
       elements of the environmental impact assessment document?

ADD TO THE ADVICE TO REVIEWERS FLIPCHART LIST AS APPROPRIATE.

    Now I would like to ask you how you thinkyour review of the project description, purpose
    and need, and alternatives would have gone in each of the other review situations we
    discussed earlier. Specifically,

RECORD PARTICIPANT RESPONSES ON THE FLIPCHART.

    *  What if you had been in a position to be a proactive reviewer, if the project proponent
       had come to you or you to them early in the process, say, prior to establishing the
      purpose and need and alternatives and you were able to make suggestions about the
       alternatives to be considered, and to discuss the project description, purpose and need
       with him or her?

ALLOW DISCUSSION FOR UP TO TWO MINUTES.

    •  How about an empowered reviewer?  What resources, or sources of information would
      you want to have to conduct a better review?
                                        4-11                                July 1998

-------
Principles of Environmental Impact Assessment Review
Facilitator's Manual
REFER TO FLIPCHART# 3-4 (TOOLS AND TECHNIQUES). REFER TO THE RESOURCE MANUAL.

    For example, the following sections in the Resource Manual provide useful information on
    assessing the purpose and need of a proposed project and identifying alternatives:

    1.3.1    Purpose and Need
    1.3.2    Statement of Underlying Need Defines the Range of Alternatives
    1.3.5    Generation of Alternatives
    1.S.3    Defining the Scope of Alternatives.

ALLOW DISCUSSION FOR UP TO TWO MINUTES.

PARTG.   Day 1 Wrap-Up (Group Discussion, 10 min.)

REVIEW THE SESSIONS COVERED DURING DAY 1 (OR THE PREVIOUS EVENING AND DAY 1).

    During the day we have covered several basic principles of environmental impact
    assessment review.

    We have discussed the role of the reviewer in the process, what is needed to understand the
    context within which the review takes place, and different situations a reviewer may find
    him/herself in.

    We have also discussed approaches to reviewing environmental impact assessment
    documents.  First "holistically," we reviewed the overall environmental impact assessment
    document. Afterwards, we began to review the components of the environmental impact
    assessment document by reviewing the Purpose and Need and Alternatives.

    • Does anyone have any questions or comments on the materials we have covered today?

ANSWER ANY QUESTIONS THE PARTICIPANTS POSE, REDIRECTING THEM TO OTHER PARTICIPANTS
WHERE APPROPRIATE AND ENCOURAGE THE DEVELOPMENT OF A FULL GROUP DISCUSSION.
CONNECT POINTS THE PARTICIPANTS MAKE WITH THE LEARNING OBJECTIVES OF THE DAY'S
SESSIONS AND/OR THE SESSIONS THAT WILL BE HELD TOMORROW.

ANNOUNCE THE STARTING TIME FOR DAY 2 AND ANY OTHER NECESSARY LOGISTICAL
ARRANGEMENTS OR COMMENTS.
                                       4-12
         July 1998

-------
Principles of Environmental Impact Assessment Review
                                                    Facilitator's Manual
                           SESSION 5: REVIEW OF THE
               DESCRIPTION OF THE ENVIRONMENTAL SETTING
 MATERIALS:
                                     TIME: 2 hours and 15 minutes
 Flipcharts:
5-1 Environment Types
5-2 Kinds of Data
5-3 Sources of Data
5-4 Local Information and Sources
5-5 Road Map for Environmental Setting Review
SETTING: Group discussion
           Small group exercise
 Handouts:
 Other:
5-1 Local Information and Sources
5-2 Environmental Setting - Document Excerpts
5-3 Instructions for Environmental Setting Review
5-4 Environmental Setting Checklist

Case studies
Resource Manual (e.g.,  1.5.5; 2.2; 7)
 TEXT:
 2.2.4  Preparation and Review of the Draft Environmental Impact Assessment
 4.4   Description of the Environmental Setting
 Appendix A Environmental Impact Assessment Evaluation Checklist
 PURPOSE:   • To introduce key natural and human (socioeconomic) environment types
              • To introduce key information types and sources relevant to environmental
                setting
              • To present a road map to guide review of the environmental setting portion
                of an environmental impact assessment
              • To practice review of environmental setting on real environmental impact
                assessment documents.
 TIME BREAKDOWN:
 Part A   Overview of Previous Sessions
 Part B   Components of Environmental Setting
 Part C   Approach to Environmental
         Setting Review
 Part D   Environmental Setting Case Study
         Review
 Part E   Report-Out on Environmental Setting
         Review
 Part F   Session Wrap-Up
 Break
                             Group Discussion
                             Group Discussion

                             Group Discussion

                             Small Group

                             Reports from Small Groups
                             Group Discussion
                        10 minutes
                        15 minutes

                        10 minutes

                        50 minutes

                        25 minutes
                        10 minutes
                        15 minutes
                                        5-1
                                                             July 1998

-------
Principles of Environmental Impact Assessment Review
Facilitator'sManual
PART A.   Overview of Previous Sessions (Group Discussion, 10 min.)

     Welcome to the second day of the course. At the beginning of each day, we will open our
    discussion with a ten minute overview of what we covered on the previous day.  In addition
    to refreshing your memory and setting the stage for new sessions, this is your opportunity to
    ask any unresolved questions you may have from previous sessions.

    Let us take a look at what we covered yesterday. Session I was an introduction to the
    course.  We described the purpose and background of the course, set some ground rules,
    and discussed the agenda and different reviewer situations (SOLO, PROACTIVE,
    EMPOWERED, AND LEAD).

    Session 2 was on the Reviewer's Role in the Environmental Impact Assessment Process.  In
    that session, we did three primary things: I) we developed a common understanding of the
    environmental impact assessment process and key terms and the role of the reviewer
    throughout; 2) we discussed the legal, organizational, institutional, and personal context for
    review of environmental impact assessment documents and 3) we established the overall
    focus for a review and what a "good review" would include.

POINT TO THE "REVIEWER'S FOCUS" FLIPCHART (#2-5) ON THE WALL FROM SESSION 2.

    In Session 3 we discussed different ways to conduct an overall review of an environmental
    impact assessment document, as well as review of the scoping portion of such a document.
    We also presented a road map for overall and scoping review,

POINT TO THE FLIPCHART ROAD MAPS FOR OVERALL REVIEW (#3-1 AND 3-2) AND FOR SCOPING
REVIEW (#3-3) ON THE WALL FROM SESSION 3.

    ...and you put those road maps to use during practice review of actual case study
    environmental impact assessment documents. We then presented a list of tools and
    techniques to use during review.

POINT TO THE TOOLS AND TECHNIQUES FLIPCHART ON THE WALL FROM SESSION 3 (#3-4).

    We closed by developing an Advice to Reviewers list for things that we want to remember to
    look out for during our reviews based upon our experience.

POINT TO THE ADVICE TO REVIEWER'S LIST FROM SESSION 3 (#3-5).

    In Session 4 we discussed ways to review a project description, as well as a purpose and
    need statement, and alternatives to a proposed project.  As in Session 3, we developed a
    road map to help you review these elements of an environmental impact assessment,
                                         5-2
         July 1998

-------
Principles of Environmental Impact Assessment Review      	Facilitator's Manual

POINT TO THE ROAD MAP FOR PURPOSE AND NEED AND ALTERNATIVES REVIEW (#4-3 AND 4-4)

    ...and practiced review on case study documents.

    ...and added to our advice for reviewers list.

POINT TO THE ADVICE TO REVIEWERS LIST

    •   Does anyone have any questions about any of the material we have covered thus far?

    Today we are going to focus on other key elements of the process: description of the
    environmental setting, assessment of impacts, and mitigation of adverse impacts. We will
    close with an introduction to the overall review of the draft environmental impact
    assessment that we will cany through tomorrow morning.  I want to remind you that
    documentation during your review is important and that you will be making use of all of
    your individual and collective notes as you move along through each session of the course.
    Each session builds on the last.

PART B.   Components of Environmental Setting (Group Discussion, 15 min.)

    Yesterday we reviewed the description of the proposed project and alternatives to learn
    "What is proposed to be done and why?." This session addresses how to review the
    environmental setting portion of an environmental impact assessment document, to learn
    "Where and on what might it have an impact." A good description of the environmental
    setting allows us to assess the potential environmental impacts associated with a project and
    its alternatives.

    To prepare you to review this part of an environmental impact assessment, we are first
    going to:

    •  Identify what should be included in the description of the environmental setting..

    Then we will:

    •  Identify those information needs and sources that are particularly important in
       describing the existing natural environment and human, or socioeconomic, environment.

    •  Develop and review our road map;

    •  Present a tool for environmental setting review;

    •  Actually review the environmental setting portion of our assigned case studies; and

                                         5-3                                 July 1998

-------
 Principles of Environmental Impact Assessment Review
Facilitator's Manual
     *  Refine our Advice to Reviewers list.

INTRODUCE FLIPCHART # 5-1 NATURAL AND HUMAN (SOCIOECONOMIC) ENVIRONMENT TYPES.

     *  Let us start with what makes a description of the environmental setting complete. What
       should be included?

     I have two lists here of the broad issue areas that should be considered in the review of the
     description of the environmental setting.  The environmental setting includes both the
     natural environment and human, or socioeconomic, environment. There are many ways we
     could have organized these lists and you may want to amend or add to them as we go
     through and review what might be included in each of the headings.

     Can you think of any circumstances when certain factors from either list might not be
     needed or not needed in any detail?

ASK IF ANYONE WOULD LIKE TO ADD ANY ENVIRONMENT TYPES TO EITHER LIST. RECORD
RESPONSES ON THE LIST.

    Any listing exercise such as this is going to be helpful for many, but not all, issues of
     concern to you in a particular setting. Many reviewers find it helpful to have a list that they
     can either use as a checklist, or refer to, to ensure they have not overlooked anything.  We
     have a checklist for you later, and you may want to tailor it to your own needs. The
    Environmental Impact Assessment Evaluation Checklist that will be distributed is also
     included in both the Student Text (Appendix A) and the Resource Manual (Section 2.2).

    Next, we need to ask what a reviewer can reasonably expect to see in terms of the level and
    type of data and information provided on these topics in an environmental impact
    assessment. Let us look at some examples of the kinds of information that you would expect
    to see associated with each environment type.

INTRODUCE FLIPCHARTS # 5-2 (KINDS OF DATA). BENEATH IT WILL BE FLIPCHART #5-3  (SOURCES
OF DATA). REMOVE FLIPCHART #5-3 AND POST IT ON THE OTHER FLIPCHART STAND so BOTH #5-2
AND #5-3 ARE VISIBLE.

    As you can see, there are potentially many different kinds of information that can be
    included in a description of the environmental setting. These information types also come
    from a wide variety of sources.  Can anyone offer other examples of information  types, or
    specific sources?

RECORD ON A BLANK FLIPCHART "INFORMATION AND SOURCES" AND POST IT WHEN COMPLETE.
                                         5-4
         July 1998

-------
Principles of Environmental Impact Assessment Review	   Facilitator's Manual

    Example data types for each of the topics listed for natural and human environment are
    provided in your Student Text in Section 4.4, and data sources are addressed in the
    Resource Manual in Section 1.5.4 - Assessment and 7.5.5 - Sources of Environmental Data.

DIRECT PARTICIPANTS TO OPEN THE STUDENT TEXT TO SECTION 4.4, AND THE RESOURCE MANUAL
TOSECTION 1.5.5. WALK PARTICIPANTS THROUGH A FEW ENVIRONMENT TYPES AND INFORMATION
SOURCES TO ACQUAINT THEM WITH THESE RESOURCES.

WE ALSO WILL NOW PROVIDE A FORMAT YOU CAN USE WITH YOUR COLLEAGUES TO IDENTIFY KEY
SOURCES OF INFORMATION YOU MAY WANT TO DRAW UPON IN YOUR OWN COUNTRY OR
COMMUNITY AS A REVIEWER.

REVEAL FLIPCHART # 5-4 (LOCAL INFORMATION AND SOURCES) AND DISTRIBUTE THE COMPANION
HANDOUT #5-1.

    *  What are the credible sources of information in this country for some important
       environment types? What gaps in information exist? Haw would you fill them?  What
       could you do as a reviewer in the different reviewer roles we discussed?

RECORD RESPONSES ON THE FLIPCHART.

DISCUSS SPECIFIC ATTRIBUTES OF INFORMATION SOURCES, GAPS, HOW GAPS CAN BE FILLED.
REMOVE THE FLIPCHART AND POST IT ON THE WALL.

Significance:

    There is a key point that applies to any of these information types and sources: the level of
    detail provided for each aspect of the environmental setting, in the form of discussion and
    supporting data,  should be commensurate with the potential for significant environmental
    impact. We would have some sense of this from the results of the scoping process — the list
    you put together on significant issues is a start.  For example, if it had been decided during
    scoping that a particular proposed project would most likely result in severe impacts to a
    coastal fishery, then the level of detail and quantity of supporting data in the document
    about that fishery should be high.

TITLE A NEW BLANK FLIPCHART "ADEQUACY."
                                                                   -»"
    •  We have talked about completeness in terms of topics and the kind of information that
       one might find or need about those topics.  Now, I 'd like to consider the adequacy of the
       information presented.  What should a reviewer look for to judge the adequacy of the
       information in the El A on the environmental setting?
                                        5-5                                July 1998

-------
Principles of Environmental Impact Assessment Review
                                           Facilitator's Manual
       Possible responses:
   - Date the data was collected: is it out of date?
   - Season when data was collected, and time of day
   - Period of time: conditions (e.g., particularly dry or wet)
   - Quality control information on the data
   - Whether information was from a reputable source
   • Demographics of persons interviewed and described
   - Appropriate consideration of age, gender, sex, ethnic or religious
    group for the issues raised
   - Whether data covers the entire extent of the "affected
   environment" for the specific type of environmental issue.
    Those are all good responses.

    •  Haw can you as reviewers determine whether information or data that is presented is
       adequate if you are not an expert in the field?
    Possible responses:
   - Consistent logic
   - Documentation
   - Ask an expert
   - Look for answers to key questions.
    To bring together our discussion on the description of the environmental setting, let's look
    at several statements drawn from environmental impact assessments. For each we will
    discuss whether you find them adequate, and will identify issues that the statements may
    raise and the additional information, if any, you would expect to find in an environmental
    impact assessment to support them.

DISTRIBUTE THE HANDOUT #5-2(ENViRONMENTAL SETTING - DOCUMENT EXCERPTS).

ASK A PARTICIPANT TO VOLUNTEER TO READ EACH STATEMENT. FOR EACH STATEMENT, SOLICIT
COMMENTS FIRST ABOUT WHETHER IT IS SUFFICIENT, AND IF NOT, WHAT ADDITIONAL
INFORMATION WOULD THEY WANT TO SEE.  ASK IF ANYONE THOUGHT THE STATEMENT WAS
SUFFICIENT AND WHY. IF SOMEONE RESPONDS THAT A STATEMENT IS INSUFFICIENT, ASK WHY.
TRY TO HAVE THE GROUP IDENTIFY THE KINDS OF CIRCUMSTANCES IN WHICH IT MAY OR MAY NOT
BE ACCEPTABLE. ALLOW 5 MINUTES OF DISCUSSION FOR EACH STATEMENT. MAKE SURE THE
DISCUSSION INCLUDES THE KEY POINTS IDENTIFIED BELOW.

KEY POINTS TO ADDRESS DURING DISCUSSION:
    Assessment
Identifying the right boundary for the environmental impact
                                        5-6
                                                    July 1998

-------
Principles of Environmental Impact Assessment Review
                                                 Facilitator's Manual
    Boundary
    Infrastructure
    Flora and Fauna
    Endangered
    Species
    Demographics
assessment is critical.  The decision should be based upon resources  and
populations potentially affected by the proposed action and not  on political
boundaries such as municipalities, counties, provinces, or states.

    To serve as an effective planning tool, environmental impact
    assessment documentation of the environmental setting should support
    analysis of the impact of a proposed action on the future capacity of a
    community's infrastructure, including its sewage treatment plant,
    drinking water supply, and transportation and communication systems.

    The environmental impact assessment must be supported by specific
    documentation on the flora and fauna within the assessment area to
    determine potential impact to the biological community.

    By their very nature, endangered species may not be readily
    observed in a given time frame.  More discussion is needed to
    determine if there ever were observations, and where and when the
    observations took place and why they are or are not valid now.

    The use of specific resources must be discussed comprehensively and
    include an  assessment of gender, age, and cultural factors relative to
    their use. The specific distribution of the affected population relative
    to the resource must be considered. Differential resource use by
    segments of the population may lead to significant impacts when
    viewed as a subpopulation rather than in terms of the population as a
    whole. The USAID Environmental Health Project's Communities
    Involved in Managing Environmental Pollution program found that in
    societies where women are secluded from men, women will tend to
    use water sources closer to home, despite cleaner water being
    available further away.

    To evaluate the potential impact of a proposed action on the economy
    in the  assessment area, detailed information on the composition,
    existing condition, and interrelationships between specific sectors of
    the economy is needed.
PART C.   Approach to Environmental Setting Review (Group Discussion, 10 min.)

    Let us summarize what we have discussed so far by reviewing the Road Map we prepared
    for review of environmental setting.

REVEAL FLIPCHART #5-5 (ROAD MAP FOR ENVIRONMENTAL SETTING REVIEW).
    Socioeconomics
                                          5-7
                                                         July 1998

-------
Principles of Environmental Impact Assessment Review
Facilitator's Manual
    The Road Map is intended to help you maintain focus on the elements of environmental
    setting review.  As indicated on your Road Map, in conducting your review, you should, at a
    minimum, keep the following issues in mind:

    •All relevant types of natural and human environmental issues are addressed

    • Affected area or community is adequately and accurately defined

    • Map of the environmental impact area and surrounding features is adequate

    • Baseline is established to measure environmental impact

    • Appropriate information and data are documented and used appropriately

    • Information is linked back to proposed project description, purpose and need,
      alternatives?

    • Levels of detail are appropriate to significance

    • Information and data are of acceptable quality and relevance ?

    • Section is internally consistent in its approach to analyzing issues?

    For your reference, the Road Map for Environmental Setting Review is located in Section
    4.4.6 of the Student Text.
                                         5-8
         July 1998

-------
Principles of Environmental Impact Assessment Review	Facilitator's Manual

PART P.    Environmental Setting Case Study Review (with and without checklist -
            Small Group Exercise, 50 min.)

    We will now practice reviewing the description of the environmental setting using the four
    case studies from yesterday.

    As you conduct your review, remember to keep the road map we just discussed in mind.

DISTRIBUTE HANDOUT #5-3- INSTRUCTIONS FOR ENVIRONMENTAL SETTING REVIEW,

DIVIDE THE CLASS BACK INTO THE FOUR GROUPS CREATED DURING THE SESSION 4 EXERCISE.

KEEP F1JPCHART #5-5 (ROAD MAP FOR ENVIRONMENTAL SETTING REVIEW) POSTED FOR THE
DURATION OF THE EXERCISE.

DISTRIBUTE HANDOUT #5-4 (ENVIRONMENTAL SETTING REVIEW CHECKLIST) TO TWO, AND ONLY
TWO, OF THE FOUR GROUPS.

    You will have a total of 50 minutes to conduct this review of the description of the
    environmental setting. You will need to do several things during that time.
    1) Determine how much time you will need as individuals to review the document.
    2) Convene your small group and discuss your observations questions, and share ideas.
    3) Prepare a group report. Alternative points of view are welcomed and part of the report.

    Finally, two of the four groups will use a checklist for reviewing the environmental setting
    and two groups will not.  This way we can compare differences when we share our groups'
    findings.

    It is now       Your small groups will have until	(50 minutes from now) to review
    this element of the environmental impact assessment, discuss your observations and
    questions, and prepare your reports.  Reports should focus on answering questions posed by
    the environmental safety road map. I will announce when 10 minutes are left so you will
    know how to structure your remaining time.

    Does anyone have any questions?

DURING THE ACTIVITY, YOU SHOULD DO THE FOLLOWING THINGS:

•   MONITOR TIME AND EITHER MAKE VERBAL ANNOUNCEMENTS OF OR POST THE TIME
    REMAINING;

•   CIRCULATE TO ENSURE SMALL GROUPS FOCUS ON REVIEWING THE ENVIRONMENTAL SETTING;

                                        5-9                                July 1998

-------
Principles of Environmental Impact Assessment Review
Facilitator's Manual
•   CLARIFY ANY CONFUSION THE PARTICIPANTS HAVE ABOUT THE INSTRUCTIONS OR THE REVIEW
    PROCESS;

•   DETERMINE HOW THE GROUPS WILL REPORT OUT; AND

•   TEN MINIFIES BEFORE THE END OF THE ACTIVITY, ANNOUNCE THE TIME REMAINING,

•   FIVE MINUTES BEFORE THE. END OF THE ACTIVITY, DIRECT EACH GROUP TO ELECT A
    SPOKESPERSON WHO HAS NOT YET PRESENTED.

FART E.   Report-Out on Environmental Setting Review (Reports from Small Groups, 15
           min.)

RE-CONVENE ALL GROUPS.

THE TWO GROUPS THAT DID NOT RECEIVE CHECKLISTS SHOULD PRESENT FIRST.

    It is time to re-convene and discuss the results of your review of environmental setting.  We
    are just trying to get a basic idea of your findings. Please focus on answering the questions
    posed by our road map.

AT LEAST HALF OF THE REPORT-OUT TIME SHOULD BE LEFT AFTER THE FIRST TWO GROUPS REPORT.

ASK THE TWO GROUPS THAT DID HAVE THE CHECKLIST TO REPORT OUT.

DURING REPORT-OUT, ASK OTHER GROUPS TO COMMENT.

RECOMMEND THAT EACH GROUP'S FLIPCHARTS BE TITLED, NUMBERED, ETC. so THAT IT is POSSIBLE
TO CORRECTLY REFER TO THEM DURING OTHER EXERCISES, OR AFTER THE COURSE IS OVER.

ONCE ALL GROUPS PRESENT THEIR FINDINGS, GENERALIZE INTO THE LARGER CONCEPTS
PRESENTED IN THIS SESSION. REFER TO THE KEY CRITERIA IN THE ROAD MAP AND THE FLIPCHARTS
OF FINDINGS FROM EACH OF THE SMALL GROUPS.
HIGHLIGHT THOSE AREAS WHERE THE GROUP THAT DID HAVE THE CHECKLIST MAY HAVE
BENEFITTED FROM USING IT, TO UNDERSCORE THE BENEFITS AND LIMITATIONS OF USING A
CHECKLIST (DISTRIBUTE HANDOUT #5-4 TO ALL ONCE REPORTING IS OVER).

DISCUSS THE ADVANTAGES AND DISADVANTAGES OF USING CHECKLISTS. THE BENEFITS DERIVED
SUCH AS CONSISTENT APPROACH AND COMPREHENSIVE REVIEW SHOULD COME OUT DURING THE
DISCUSSION. IN TERMS OF DISADVANTAGES, SPECIFICALLY STATE THAT:
                                     5-10
        July 1998

-------
Principles of Environmental Impact Assessment Review	Facilitator's Manual

    The checklist is not a substitute for understanding the process to be followed and the
    analysis to be conducted.  Also, relevant issues and information presented in the document
    may not always be anticipated by the checklist.  The checklist is to be used as one tool to aid
    you as reviewers, not as a replacement for your knowledge, skills, and ability as reviewers.

PART F.    Session Wrap-Up (Group Discussion, 10 min.)

    Having had the experience of reviewing the description of the environmental setting in your
    environmental impact assessment documents, let us review that experience.

    •  First, was the Road Map helpful? What would you add to it now that you undertook your
       review?

UPDATE THE ROAD MAP FLIPCHART BASED ON PARTICIPANT COMMENTS.

    •  What other portions of the environmental impact assessment document might be relevant
       to reviewing the description of the environmental setting?

       Possible responses:    Scoping
                           Project description
                           Purpose and need and alternatives
                           Projected environmental impacts
                           Proposed mitigation.

    MAKE REFERENCE TO THE "ADVICE TO REVIEWERS" FLIPCHART .

    •  What kinds of things would you advise other reviewers to "watch out for" when reviewing
       the description of the environmental setting?

RECORD RESPONSES ON THE ADVICE TO REVIEWERS FLIPCHART.

       Possible responses:    - Imbalance of descriptive materials: a lot of information on
                           issues of insignificance and little information on significant issues
                           - Inadequate justification for dismissing an aspect of the
                           environment (e.g., "No endangered species have been spotted in the
                           region for the past three years, so there must be none")
                           - Inadequate quantification (e.g., "Current waste water treatment
                            capacity is adequate")
                           - Inadequate bases for assessment of impacts.

IT IS NOT NECESSARY TO RECORD THE FOLLOWING RESPONSES ON A FLIPCHART.


                                         5-11                                July 1998

-------
 Principles of Environmental Impact Assessment Review
Facilitator's Manual
     *  What benefits can you imagine if you were a proactive reviewer with respect to
       evaluating environmental setting?

ALLOW DISCUSSION FOR UP TO TWO MINUTES.

     •  How about if you had been an empowered reviewer?  What resources, or sources of
       information would you want to have available to conduct the review?

ALLOW DISCUSSION FOR UP TO ONE MINUTE, THEN INTERRUPT:

    As we mentioned in the last session, one of the most effective tools environmental impact
    assessment reviewers can use is a checklist.  Environmental impact assessments are usually
    quite large, -with hundreds of pages of often complex information. Using a checklist such as
    the one you were provided with earlier in this course, which is also located in your Student
    Text (Appendix A) and Resource Manual (Section 2.2), can help ensure that you cover all of
    the key points of review.  Other tools and techniques that can be useful for this analysis
    include all the items on the Tools and Techniques flipchart and some items that are
    specifically provided as part of the Resource Manual such as in Section 7 - Environmental
    Impact Assessment Resources Available on the Internet and Compact Disc.

POINT TO FLIPCHART # 3-4 (TOOLS AND TECHNIQUES).

    You will need to rely upon a wide range of tools and techniques.  The types listed on this
    flipchart include specific information like the information included in the following sections
    of the Student Text:

       4.4. / Existing Physical-chemical Environment
       4.4.2 Existing Biological Conditions
       4.4.3 Waste Management and Pollution Prevention
       4.4.4 SocioeconomicEnvironment
       4.4.5 Cultural Resources
       4.4.6 Reviewing the Description of the Environmental Setting
       Appendix A - Environmental Impact Assessment Evaluation Checklist

    Additionally, you may need to undertake your own data collection efforts, such as field
    reconnaissance tours and library research.

    In our next session, we will go over the elements of reviewing an environmental impact
    assessment document for potential environmental impacts.  The next facilitator will be
    [INTRODUCE NEXT FACILITATOR].
IF TIME ALLOWS, GIVE PARTICIPANTS UP TO A FIFTEEN MINUTE BREAK AT THIS POINT.

                                         5-12
         July 1998

-------
Principles of Environmental Impact Assessment Review
               Facilitator's Manual
        SESSION 6: REVIEW OF POTENTIAL ENVIRONMENTAL IMPACTS
 MATERIALS:                                TIME:
 Flip charts:   6-1 Types of Environmental      SETTING:
              Impacts
              6-2 Examples of Environmental Impacts
              6-3 Road Map for Environmental
              Impact Review
        3 hours 35 minutes
        Group discussion
        Small group exercise
 Handouts:    6-1 Environmental Impact Evaluation - Document Excerpts
              6-2 Environmental Impact Checklist
              6-3 Instructions for Review of Impacts in Case Studies

 Other:       Case Studies
              Resource Manual (e.g., 1.3.6; 1.5.6; 1.5.7; 1.5.8; 1.5.9; 1.5.12; 1.5.13; 1.5.14;
              2.1; 2.2; 3.1; 5; and 7)
 TEXT:
 2.2.4  Preparation and Review of the Draft Environmental Impact Assessment
 4.5    Potential Environmental Impacts
 Appendix A Environmental Impact Assessment Evaluation Checklist
 Appendix B Environmental Impact Assessment Methodologies
 PURPOSE:   • To introduce key environmental impact types
              • To discuss the importance of forecasting methods for environmental impact
                review
              • To present a road map to guide review of the environmental impacts portion
                of an environmental impact assessment document
              • To practice review of environmental impacts on real environmental impact
                assessment documents.
 TIME BREAKDOWN:
 Part A Environmental Impact Definition and
       Forecasting Methodologies
 Part B Approach to Environmental Impacts Review
 Part C Environmental Impacts Review
       Lunch Included
 Part D Report-Out on Environmental Impacts Review
 Part E Advice to Reviewers List
 Group Discussion
Group Discussion
 Small Group Case

 Group Discussion
 Group Discussion
40 minutes
10 minutes
140 minutes

15 minutes
10 minutes
                                       6-1
                       July  1998

-------
Principles of Environmental Impact Assessment Review
Facilitator's Manual
PART A.   Environmental Impact Definition and Forecasting Methodologies (Group
            Discussion, 40 min.)

    Projecting and evaluating environmental impacts of a proposed action and its alternatives
    is at the heart of environmental impact assessment. To start our discussion, 1 would tike us
    to "walk through the Reviewer's Focus (REFER TO FUPCHART&2-5) and start with what makes
    the evaluation of environmental impacts complete.

    •  To do that, let's start by talking about what we mean by "environmental impacts." What
       are we referring to by the "environmental"part of "environmental impacts"? What
       types of environments can be affected?

SOLICIT 3-4 RESPONSES.

    Impacts can happen to any of the environment types we identified during the last session,
    Review of the Description of the Environmental Setting.

REFER TO FLIPCHARTS ON WALL FROM SESSION 5: REVIEW OF THE DESCRIPTION OF THE
ENVIRONMENTAL SETTING. READ SOME OF THE HEADINGS UNDER NATURAL ENVIRONMENT AND
SOME OF THE HEADINGS UNDER HUMAN ENVIRONMENT.

    * Are the environmental impacts supposed to include only impacts that are adverse?

DISCUSS BENEFICIAL VERSUS ADVERSE ENVIRONMENTAL IMPACTS FOR 1-2 MINUTES.

    I would like to emphasize that the environmental impacts chapter of an environmental
    impact assessment document should consider all potential impacts, beneficial and adverse,
    and their relative significance.

REVEAL FLIPCHART # 6-1 (TYPES OF ENVIRONMENTAL IMPACT).

    Within any of the environment types we listed there are not only adverse and beneficial
    impacts, there are also three types of environmental impact:

    L Primary impacts—A primary impact is direct and occurs at the same time and place as
      the action.  Primary impacts are associated with the construction, operation, and/or
      maintenance of a facility or activity. They are generally visibly obvious and
      quantifiable;

    2. Secondary impacts—Secondary impacts occur later in time, or at a different place from
      the initial action.  These impacts are indirect or induced changes in the environment,
      population, economic growth, and land use;
                                        6-2
        July 1998

-------
Principles of Environmental Impact Assessment Review	Facilitator's Manual

    3. Cumulative impacts—Cumulative impacts result from the incremental impact of a
       proposed action on a common resource when added to other past, present and
       reasonably foreseeable future actions.  These may include the collective effects of
       individually minor actions over a period of time, (e.g., the combined effect ofwastewater
       discharge, dredging, and agricultural runoff on a small estuary, or several dams
       constructed throughout a single river basin).

    An environmental impact assessment is not complete without considering all three types of
    environmental impacts.

RECORD RESPONSES TO THE FOLLOWING QUESTIONS ON FLIPCHART 6-2 (EXAMPLES OF
ENVIRONMENTAL IMPACTS).

    •  Okay,  who can give me examples ofprimarv impacts on the environment types we
       identified in the last session?

       Possible responses:
        Water Resources
        -   Sediment loading to waters adjacent to the site
        -   Accumulation of toxics within adjacent water bodies
        Biological Resources
        -   Loss of habitat, nesting areas, migration pathways, food resources, and/or breeding
            grounds and subsequent reductions in biological  species
        -   Displacement of rare, unique, or commercially valuable species

    Can anyone give me examples of secondary impacts on any environment types?

       Possible responses:
        Land Use
        -   Inadequate land use controls to prevent conversion of lands designated for
            protection by the government
        Geological Resources
            Slope failure
        -   Subsidence

    •  Can anyone give me an example of cumulative impacts to any environment types?
       Possible responses:
        Water Resources
        -  Multiple sources of pollution cause waters to exceed standards
        Biological Resources
        -  Bioaccumulation of toxics resulting in potential ecological and human health risks
        -  Reduced biodiversity

                                          6-3                                 July  1998 ,

-------
Principles of Environmental Impact Assessment Review
Facilitator's Manual
    •  Should potential impacts be assessed for only the preferred alternative or for all
       reasonable and feasible alternatives?

    I would like to emphasize that environmental impacts should be assessed for all reasonable
    and feasible alternatives, and in a roughly equal level of detail. It is often the case in
    environmental impact discussions that certain alternatives receive significantly more
    attention and detail than others. This can be due to omission, or to intentional efforts to
    downplay the negative or positive attributes of one or more alternatives relative to the
    others.

    •  What about examples of beneficial environmental impact, in each category?

    •  When considering potential environmental impacts:

        —  Should the environmental impact assessment focus only on projected impacts once
            a project is operating?

        -   What other stagefs) of a project would you say that the environmental impacts
            chapter of an environmental impact assessment should assess?

ALLOW PARTICIPANTS TO MAKE 3-5 SUGGESTIONS.

    As you are correctly pointing out, it is important for the environmental impact assessment to
    identify and assess potential impacts for all stages of the proposed action. This includes:

       •    Initial site preparation and construction,
       •    Facility operation, and
       •    Post-facility operations, or site closure.

    We have discussed the types of environmental impacts that should be assessed in an
    environmental impact assessment document to make it complete, and you provided specific
    examples of impacts.  Now, given all the potential impacts, let's talk about how significance
    of impacts is determined and how you can consider significance during a review.

CREATE A BLANK FLIPCHART TITLED "SIGNIFICANCE."
BRAINSTORM ON, AND RECORD ON A FLIPCHART, FACTORS THAT MIGHT INFLUENCE THE
SIGNIFICANCE OF POTENTIAL IMPACTS, FOCUSING ON THE FOLLOWING FOUR AREAS:
                                          6-4
         July  1998

-------
Principles of Environmental Impact Assessment Review	Facilitator's Manual

    •  What factors about the impact might influence its significance?
       Responses should include:
       Geographical context
        -Local
        - Regional
        - State
        - National
       Duration of impact
        - Daily, Weekly, Monthly, Annually
        - Short term/long term
       Magnitude of impacts
        - Exceeds public health or environmental standards or thresholds
        •Rate of change
        - Severity of effect
        - Permanence of the change, is it reversible/irreversible
        - Degree of uncertain or unknown risks
        - Occurrence of cumulative impacts  ,
        - Threat to commercially or recreationally valuable, threatened or endangered species
        or their critical habitat
       Public perception of impacts
        - Degree of controversy of the environmental impact
        - Likelihood that a precedent will be set
        - Degree to which cultural or historical sites may be affected
        • Degree to which important scientific, cultural, or historical resources are lost

    Those are good thoughts.  I would like to emphasize the following about reviewing for
    significance of environmental impacts:

    •  The four criteria we discussed above, geographical context, duration of impacts,
       magnitude of impacts, and public perception of impacts, should all be considered in an
       environmental impact assessment. If one or more of these elements are absent, you
       should question whether its absence is justified.

    •  As a reviewer, you should use established standards and criteria to help determine
       whether assessments of the significance of environmental impacts are accurate. For
       example, if the project proponent claims that a change in water quality due to a proposed
       project will be insignificant, you may want to compare the data provided to existing
      federal or state water quality standards to make your own determination of significance.

    •  What do you do as a reviewer if these quantitative standards are not available?
       It is important for reviewing organizations and in their absence, by default the reviewer,
       to develop environmental impact decision or significance criteria for assessing impacts.

                                          6-5                                 July 1998

-------
Principles of Environmental Impact Assessment Review
Facilitator's Manual
       You can then use such criteria during your review in order to compare your judgements
       about significance of environmental impact to the project proponent's statements. In
       addition, if you are in a proactive review situation, you may be able to provide your
       criteria to the project proponent prior to their assessment of impacts.

    One possible set of decision criteria is as follows:

    •  Significant adverse environmental impact (e.g., project mil cause air quality to exceed
       health-based standards)

    •  Adverse environmental impact (e.g., construction phase contributes paniculate matter to
       air)

    •  No environmental impact (e.g., project does not contribute to air pollution)

    Appendix C.2 in the Student Text contains examples of how decisions of significance were
    made by several different organizations with regard to seven components of an
    environmental setting for a specific project. For each component, potential environmental
    impacts were categorized into three levels of impact as we just did: Significant Adverse
    Environmental Impact, Adverse Environmental Impact, and No Environmental Impact. For
    example, one of the seven components of the environmental setting was water resources.
    One of the types of environmental impact that was categorized was introduction of
    pollutants to ground water. This type of impact was categorized in the following way:

    Significant Adverse Environmental Impact:

    •   The activity results in introduction of pollutants to potable ground water and is likely to
       cause ground water to exceed maximum  contaminant levels.

    Adverse Environmental Impact:

    •   Introduction of pollutants to potable ground water is not likely to cause ground water
       to exceed maximum contaminant level.

    And No Environmental Impact:

    *   No introduction of pollutants to ground water.

    Making use of criteria, such as the ones found in Appendix C.2 of the Student Text, can help
    a reviewer evaluate potential environmental impacts in a meaningful and consistent way.  I
    encourage you to review Appendix C. 2 on your own outside of this class.  It combines
    applicable standards,  accepted practice, local policies and professional judgement.
                                         6-6
        July 1998

-------
Principles of Environmental Impact Assessment Review	Facilitator's Manual

    • Now let's focus on the adequacy of the methods used to assess environmental impacts.
       What approaches or methodologies are you likely to see used in the assessment of
      impacts? What types of tools are used to assess impacts?

      ^Responses may include:
        Models
        -  Mathematical models
        •  Conceptual models
        Mapping or Extrapolation
        -  Mapping, overlays, or geographical information systems
        -  Extrapolation from historical trends
        Precedent and Expert Judgement
        -  Inference from outcome of similar projects
        -  Professional judgement of experts

    Lets look at haw a reviewer might approach the review when each of these methods are used
    to project environmental impacts.
      i
      !
DISTRIBUTE HANDOUT # 6-1 (ENVIRONMENTAL IMPACT EVALUATION - DOCUMENT EXCERPTS)

    In handout #6-1 we again have some excerpts from real environmental impact
    assessments. I would like you to read and assess their adequacy.

ASK A PARTICIPANT TO VOLUNTEER TO READ THE FIRST STATEMENT FROM THE HANDOUT (SHOWN
BELOW) ALLOW ABOUT TWO MINUTES OF DISCUSSION FOR THE STATEMENT.

SOLICIT COMMENTS:

WHETHER IT is SUFFICIENT, AND IF NOT, WHAT ADDITIONAL INFORMATION is NEEDED.

IF INSUFFICIENT, ASK WHY.

IDENTIFY CIRCUMSTANCES IN WHICH STATEMENT MAY OR MAY NOT BE ACCEPTABLE.
                                       6-7                               July 1998

-------
Principles of Environmental Impact Assessment Review
                                           Facilitator's Manual
                                  PREDICTIVE MODEL

       •"One year of historical water quality data, from an existing U.S. Geological Survey
    monitoring station, was entered into the Persistence model.  The results of the application
    of the model indicate that the water body adjacent to the proposed shopping center would
                      not be affected by its construction and operation."
THE DISCUSSION SHOULD INCLUDE THE FOLLOWING KEY POINTS:
       Predictive Model
It is important for the reviewer to verify that the correct model was
utilized to evaluate environmental impact. The environmental
impact assessment must contain specific information on the source
and quality of the data entered into the model and establish the
validity of any assumptions applied.
      How can you review the use of either a conceptual or mathematical model in an .
      environmental impact assessment without being a modeler or expert? What techniques
      can you use to evaluate the appropriate use of models?
      Possible responses:
- Evaluate the description of what the model assesses, how it
works, and whether it is appropriate for the analysis
- Evaluate the data inputs needed for the model, the default values,
and whether they are appropriate for the analysis
- Consider the track record of the model and its uses, is it
commonly used in these circumstances and accepted as accurate,
has it reliably assessed impacts for other projects?
- Look for documentation that justifies the choice of the model
over others that were considered
- Was the model used consistently to assess environmental impacts
of the proposed project and the alternatives?
- Is it validated as a good assessment (as opposed to a descriptive)
tool?
       What types of environmental impact analyses are likely to be performed using models?

       Possible responses:    -  Water quality
                           -  Air quality
                           -  Economic.
                                          6-8
                                                   July 1998

-------
Principles of Environmental Impact Assessment Review	Facilitator's Manual

    In the Resource Manual and Student text, we have developed and included something to
    assist reviewers in reviewing various methods used to predict impacts.

DIRECT PARTICIPANTS TO PAGE 1.5.7-1 IN THE RESOURCE MANUAL, THERE is AHIOHLY
INFORMATIVE 14 PAGE GUIDE TO ENVIRONMENTAL IMPACT IDENTIFICATION THAT BEGINS ON THAT
PAGE, TITLED "IMPACT IDENTIFICATION."  ALSO DIRECT PARTICIPANTS TO APPENDIX B IN THE
STUDENT TEXT, WHICH ALSO CONTAINS A USEFUL MATRIX DESCRIBING ENVIRONMENTAL IMPACT
ASSESSMENT MODELS.

    •  Is the model referred to listed?  Haw might you be able to use this resource and also the
       descriptions of models and analytical techniques in section 1.5.

    In addition to models for projecting environmental impact there are several other
    techniques you would encounter as a reviewer:

    •  Mapping, overlays, or geographical information systems are useful tools for delineating
       the area that will be affected and for identifying the resources within that area that will
       be affected.  This is discussed briefly on page 1.5.7-5.  What do you look for when
       evaluating whether these tools have been used appropriately?

       Possible responses:
             - Document how maps, overlays, and GIS were prepared
             - Verify placement of key features, both natural and man-made
             • Evaluate the scale used and whether its  appropriate for impact assessment.

    Further valuable information in the Resource Manual begins immediately after the section I
    just mentioned, on page 1.5.8-1 titled "Impact Analysis and Prediction." This section
    contains 32 pages of information on environmental impact analysis and prediction.  This is
    a valuable resource that I recommend you read outside of class.

    I would like to ask for another volunteer to read the next statement from handout # 6-1.
ASK SIMILAR QUESTIONS AS FOR THE PREVIOUS STATEMENTS.
                           EXTRAPOLATION/TREND ANALYSIS

       •"The population of Sanco County has grown at an annual rate of approximately 5
    percent over the past 10 years and is expected to continue to grow at this rate for the next
         10 to 15 years.  The County's current community service plans are sufficient to
                               accommodate this growth."
                                         6-9                                July  1998

-------
Principles of Environmental Impact Assessment Review
Facilitator's Manual
KEY POINTS TO ADDRESS DURING DISCUSSION:

       Extrapolation -    The data utilized to support the extrapolation must be representative and
                        reflective of the proposed action.  The environmental impact assessment
                        must demonstrate why current trends will be valid in the future.

    Extrapolation from historical trends, inference from the outcome of similar projects and
    professional judgement of experts are closely related techniques for assessing impacts.
    Reviewing the application of these approaches requires careful evaluation of the
    assumptions used to make an assessment of environmental impact. For example, you may
    want to consider:

    •  What was responsible for historical trends,  have conditions changed?

    •  Are the circumstances for this proposed project consistent with those of other projects
       used for comparison?

    •  What are the credentials of the expert? Do other experts share similar or conflicting
       opinions?

    •   What might you look for in the environmental impact assessment and haw might you
       verify these predictions?

       Possible responses:  - Look for documentation of the rationale which justifies the
                          validity historical trends or other projects that are appropriate to
                          use in assessing the impacts of this project and alternatives
                          - Seek additional expert opinioa

    The environmental impact assessment process often involves the use of technical experts
    who provide their opinions on various components of the document.

    Can I have another volunteer to read the next statement from handout # 6~J. I would like
    you to evaluate it as we have done before in this session.

READ THE FOLLOWING STATEMENT. ASK SIMILAR QUESTIONS AS IN THE PREVIOUS THREE EXAMPLE
STATEMENT DISCUSSIONS.
                                         6-10
         July 1998

-------
Principles of Environmental Impact Assessment Review       	Facilitator's Manual
                                   EXPERT OPINION

      •"A recognized transportation expert reviewed the results of a 1993 traffic study and
     determined that there would be no impact from the proposed soccer stadium on the flow
                                 of traffic within the city."
KEY POINTS TO ADDRESS DURING DISCUSSION:

       Expert Opinion-      Experts who were consulted and the source of any data utilized by
                           them to evaluate environmental impact must be identified. The
                           environmental impact assessment document should contain the
                           necessary information to contact the reference and verify the
                           suitability of the data. Verification of the qualifications of experts
                           should be a part of the review process.

    OK. Let's go to the final statement on handout #6-1. Do I have another volunteer?
                                   SEGMENTATION

    "No potentially significant impacts that require mitigation have been identified during this
                             phase of the proposed project."
KEY POINTS TO ADDRESS DURING DISCUSSION:

       Segmentation     The potential impacts of connected actions should be analyzed in a
                        single environmental impact assessment. Segmentation of a proposed
                        project is not an acceptable approach to avoiding the need to mitigate
                        significant environmental impacts.

    Sometimes information is provided on potential environmental impacts for only one phase
    of a proposed project, when information on other phases is relevant.  This is called
    "segmentation." Segmentation always raises issues of integrity of the environmental impact
    assessment. Similarly, questions of the integrity of the environmental impact assessment
    and entire process are raised when environmental impacts that are in fact significant are
    either downplayed or hidden through segmentation.
                                         6-11                                July 1998

-------
Principles of Environmental Impact Assessment Review
Facilitator's Manual
PART B.   Approach to Environmental Impacts Review (Group Discussion, 10 min.)

    Let us review what we have covered so far:

       1)   Environmental impacts can be to the natural or human (socioeconomic)
            environment.
       2)   Environmental impacts may be beneficial or adverse.
       3)   Primary, secondary, and cumulative impacts should all be assessed
       4)   The amount of information provided should be roughly equal for all reasonable
            and feasible alternatives.
       5)   The assessment should cover all stages of the proposed project from initial site
            preparation through site closure.
       6)   Appropriate assumptions and representative data should be used in valid and
            appropriate predictive techniques such as modeling, mapping or extrapolation, and
            precedent and expert judgement, to assess potential environmental impacts from
            both the proposed action and each alternative.

    That is a lot to remember, but it is all important for an effective review.  To help you stay on
    track, in this part of our discussion we will formalize these ideas into an overall framework
    that you can use to understand your role in the review of environmental impacts.

    We return once again to the Reviewer's Focus.

REFER TO "REVIEWER'S Focus" FLIPCHART (#2-5) POSTED ON THE WALL FROM SESSION 2.

    As you will recall, there are six things that you as a reviewer should focus on during review
    of an environmental impact assessment document:

       •    Coverage and Completeness

       •    Significance

       •    Adequacy

       •    Accuracy

       •    Integrity

       •    Influence.

    These are the areas you should focus on during review of every part of the document,
    including the chapter on environmental impacts. Have we discussed and proposed sufficient
                                         6-12
        July 1998

-------
Principles of Environmental Impact Assessment Review	     Facilitator's Manual

    information for you to conduct a review for each of these? To help you conduct a review of
    the environmental impact section, of an environmental impact assessment and to recall all
    the things -we have discussed, we have created a list of tools and techniques you can use in
    environmental impact review.

    The first tool I would like to introduce is the Road Map for review of the environmental
    impact chapter of an environmental impact assessment document.

REVEAL FLIPCHART # 6-3 (ROAD MAP FOR ENVIRONMENTAL IMPACT REVIEW) AND REVIEW THE
ELEMENTS AS A REVIEW OF THIS SESSION.

       •     All natural and human (socioeconomic) environmental impacts are identified

       •     Types of impacts include primary, secondary, and cumulative

       •     Detail on impacts is balanced among reasonable and feasible alternatives

       •     Both beneficial and adverse environmental impacts are identified

       •     Potential environmental impacts are identified for all phases of the proposed
           project

       •     Models, experts, and criteria accurately used to assess the significance of
            environmental impacts are valid for appropriate circumstances

       •     Data, information and hey assumptions are representative, accurate, and current

       •     Appropriate criteria are used to assess significance

       •     Are there any questions about this road map?

ANSWER ANY QUESTIONS ABOUT THE ROAD MAP.

    All right, if-we are to give more tools to our solo reviewer to empower solo,  what else might
    we include?

REFER TO FLIPCHART # 3-4 (TCOLS AND TECHNIQUES).

    There are a number of other tools and techniques that are effective in helping a reviewer
    determine whether the environmental impacts chapter of an environmental impact
    assessment is complete, adequate, of sufficient quality, focused on significant issues,
    preserves the integrity of the process, etc. As we have mentioned before, each reviewer

                                         6-13                                July 1998

-------
 Principles of Environmental Impact Assessment Review
Facilitator's Manual
    develops his or her own most effective tools and techniques for environmental impact
    assessment review during the course of his or her career.

    Last session we introduced the use of a checklist for the description of environmental setting
    review but only half of the groups were able to use it in their review. I would now like to
    give each of you a checklist for environmental impact review.

DISTRIBUTE HANDOUT # 6-2 (IMPACT ASSESSMENT REVIEW CHECKLIST).

    As you can see, this checklist contains many of the same questions we posed in our road
    map as well as a comprehensive listing of the environment and impact types. I would like to
    emphasize that you do not have to use a checklist or any other particular tool. Different
    reviewers feel comfortable using different tools and techniques.  However, this checklist can
    help many of you stay on track during environmental impact review.

    The use of checklists and other tools cannot substitute for careful, probing analysis by a
    reviewer. For example, the tools and techniques we have introduced will not automatically
    reveal significant relationships between different environmental impacts on the same
    resource. Issues such as cumulative environmental impacts usually require the expert
    judgement of experienced reviewers.

CLOSE THE DISCUSSION ON TOOLS AND TECHNIQUES WITH A REVIEW OF THE MATERIALS INCLUDED
IN THE RESOURCE MANUAL FOR THE COURSE.  REMIND PARTICIPANTS THAT HELPFUL
INFORMATION RELEVANT TO ENVIRONMENTAL IMPACT REVIEW CAN BE FOUND IN THE RESOURCE
MANUAL:

1.3.6   Environmental Impact Checklists
1.5.6   Computer-Aided Environmental Assessment
1.5.7   Impact Identification
1.5.8   Impact Analysis and Prediction
1.5.9   Summary of Fate Models Used in Environmental Assessment
1.5.12 Determination of Significance
1.5.13 Definition for Describing Significance  of Impacts
1.5.14 Determining Impact Significance in Environmental Impact Assessments
2.1     Environmental Impact Assessment Methodologies
2.2     Environmental Impact Assessment Evaluation Checklist
3.1     (World Bank Project Specific Impacts) Industrial Impacts
5       Relevant US EPA Guidance for Environmental Impact Assessment Reviewers
7       Environmental Impact Assessment Resources on the Internet and Compact Disc
(THESE SECTION NUMBERS APPLY IF USING THE U.S., ENGLISH VERSION, OF THE RESOURCE
MANUAL)
                                        6-14
        July 1998

-------
Principles of Environmental Impact Assessment Review	Facilitator's Manual

    These resources provide a range of examples tools and data to use in your review of the
    proposed project and to compare during your review.

DISCUSS HOW THIS TYPE OF INFORMATION MAY BE USEFUL TO A REVIEWER TO UNDERSTAND THE
DIFFERENT CONSIDERATIONS THAT HAVE BEEN MADE DURING CONDUCT OF THE ANALYSIS AND
DEVELOPMENT OF THE DOCUMENT.

    *  For future reference we have included a copy of the environmental impacts evaluation
       checklist in Appendix A of the Student Text, and in the Resource Manual beginning on
       page 2.2-J.  So you should feel free to mark up and use the copy we have just distributed.
    •  We have also already mentioned one of the other resources available to you in the
       Resource Manual, the document titled "Impact Analysis and Prediction " which starts on
       page 1.5.8-1.

    •  When you complete your review and report out to the group we would tike you to also
       reflect upon the situation of an empowered reviewer who could also seek advice and
       assistance from other subject matter experts in the areas where environmental impacts
       are predicted or other reviewers. The key in seeking advice from outside experts is to
       know when to seek it, from whom, and what questions to ask. We hope you will leave this
       course with more of a sense for answers to these questions but this is something that each
       reviewer develops over the course of their career.

PART C.   Environmental Impacts Review (Small Group, Case Study Review,
            approximately 80 minutes (plus 60 minutes for lunch).

INTRODUCE THE SESSION BEFORE LUNCH.

DISTRIBUTE HANDOUT 6-3 (INSTRUCTIONS FOR REVIEW OF IMPACTS IN CASE STUDIES).

    We will break into our case study review groups again for a review exercise on
    environmental impacts.  Refer to the road map we have created in order to keep your review
    focused and effective. Feel free to use the Environmental Impact Assessment Review
    Checklist or the resources we pointed out in the Resource Manual.

    You will have a total of one hour and twenty minutes to conduct this review of the
    environmental impact component of a environmental impact assessment. You will need to
    do several things during the time you spend on the case study.

       1) determine how much time you will need as individuals to review the document,
       2) convene as a group to discuss your observations and questions, and share ideas,

                                        6-15                               July 1998

-------
Principles of Environmental Impact Assessment Review
                          Facilitator's Manual
       3) prepare a group report.  Alternative points of view can be considered in the report.
    We mil take a one hour break for, lunch in approximately 25 minutes.  This mil give you
    time to individually review the material and discuss a group strategy for evaluating the
    environmental impacts presented in the case studies. After lunch, the discussion groups mil
    reconvene to continue discussing the environmental impacts and prepare for reporting out
    to the full class.

    • Does anyone have any questions?

ANSWER ANY QUESTIONS THE PARTICIPANTS HAVE ON THE PROCESS THEY ARE TO FOLLOW.

DURING THE ACTIVITY, YOU SHOULD DO THE FOLLOWING THINGS:

•   MONITOR TIME AND EITHER MAKE VERBAL ANNOUNCEMENTS OF OR POST THE TIME
    REMAINING;
•   CIRCULATE TO ENSURE SMALL GROUPS FOCUS ON REVIEWING ENVIRONMENTAL IMPACTS;

•   CLARIFY ANY CONFUSION THE PARTICIPANTS HAVE ABOUT THE INSTRUCTIONS OR THE REVIEW
    PROCESS;                                                       .

    We are now going to break for lunch.  It is now	; please return promptly in one hour at
BREAK FOR LUNCH
    Your small groups mil have until
(2 hours and 20 minutes from now, including the 1
    hour lunch) I will announce when 10 minutes are remaining so you mil know when to select
    a speaker and wrap up.

DURING THE ACTIVITY, YOU SHOULD DO THE FOLLOWING THINGS:

•   DETERMINE THE ORDER OF THE SMALL GROUP'S REPORT PRESENTATIONS;

•   TEN MINUTES BEFORE THE END OF THE ACTIVITY, ANNOUNCE THE TIME REMAINING;

•   FIVE MINUTES BEFORE THE END OF THE ACTIVITY, DIRECT EACH GROUP TO ELECT A
    SPOKESPERSON.
                                       6-16
                                 July 1998

-------
Principles of Environmental Impact Assessment Review	Facilitator's Manual

PART P.    Report-Out on Environmental Impacts Review (Group Discussion, 15 min.)

    Okay, it is time to re-convene and discuss the results of your review of environmental
    impacts.  We. are going to have each group BRIEFLY summarize their major findings from
    reviewing its document for environmental impacts. Each group should present for no more
    than THREE MINUTES. We are just trying to get a basic idea of your findings here. When
    giving your presentation, please try to focus on answering the questions posed by our road
    map.

REFER TO THE ROAD MAP FLIPCHART. IF YOU FEEL IT NECESSARY, READ IT TO THE GROUP.
OTHERWISE, ASK THE GROUP SIMPLY TO KEEP THE ROAD MAP IN MIND.

HAVE EACH GROUP PRESENT ITS FINDINGS FOR UP TO THREE MINUTES. ENCOURAGE THE
PARTICIPANTS TO ASK QUESTIONS FOLLOWING EACH REPORT.

    • Was the Road Map helpful? Did anyone use or refer to it? How would you modify it to
      better reflect your approach to the review?

UPDATE ROAD MAP BASED ON PARTICIPANT COMMENTS.

    • One way to better influence how environmental impacts are identified and assessed is to
      take the opportunity to be proactive.  What might you do in this situation if you had been
      in a position to be a proactive reviewer? What if the project proponent had come to you,
      or you to them, prior to the identification of environmental impacts. What if you were
      able to make suggestions about haw the proponent could identify and assess
      environmental impacts?

    A proactive reviewer can recommend early on that a particular predictive model would work
    well to predict the kind of impacts anticipated with the proposed project. He or she can
    work with the project proponent or draw in other experts to ensure that all significant
    impacts are identified and adequately evaluated before the environmental impact
    assessment document reaches the draft or final stage.

PART E.    Advice to Reviewers List (Group Discussion, 10 min.)

    • What kinds of things you would tell other reviewers to "watch out for " when reviewing
      this element of an environmental impact assessment document.

ADD TO THE "ADVICE TO REVIEWERS" FLIPCHART AS APPROPRIATE OR EMPHASIZE EXISTING
POINTS.  LEAD THE DISCUSSION TO IDENTIFY THE THINGS THAT CAN POSE PROBLEMS FOR AN
ENVIRONMENTAL IMPACT ASSESSMENT DOCUMENT REVIEWER.
                                       6-17                               July  1998

-------
Principles of Environmental Impact Assessment Review
Facilitator's Manual
    •  What have you learned from experiences here or during your career in the analysis or
       documentation of environmental impacts that you would caution other reviewers about?

REFER FREQUENTLY TO THE ROAD MAP.

    •  What other parts of the environmental impact assessment document would it have been
       useful for you to review for a better understanding of the environmental impacts chapter?

    Now I would like to ask you how you think your review of environmental impacts would have
    gone in each of the other review situations we discussed earlier. Specifically,

    •  What if you had been in a position to be a proactive reviewer, if the project proponent
       had come to you or you to them early in the process, say, prior to assessing potential
       environmental impacts, and you were able to make suggestions about methods and
       models that could be used, and to discuss assumptions about significance?

ALLOW DISCUSSION FOR UP TO TWO MINUTES.

    •  How about if you had been an empowered reviewer? What resources, or sources of
       information would you want to have to conduct a better review?

    Our next session will be on reviewing the environmental impact assessment document for
    mitigation.  Our next facilitator will be [INTRODUCE NEXT FACILITATOR], who will
    lead us through  this session, in which we will go over different types of mitigation (and their
    relative desirability) and will review a proposed mitigation plan in our small groups.

ANNOUNCE THE STARTING TIME FOR SESSION 7 AND ANY OTHER NECESSARY LOGISTICAL
ARRANGEMENTS OR COMMENTS.
                                        6-18
         July 1998

-------
Principles of Environmental Impact Assessment Review	Facilitator's Manual

                 SESSION 7: REVIEW OF PROPOSED MITIGATION
 MATERIALS:                                     TIME: 1 hour 40 minutes
 Flip charts:  7-1 Hierarchy of Mitigation Types     SETTING: Group discussion
              7-2 Road Map for Mitigation Review (1)          Small group exercise
              7-3 Road Map for Mitigation Review (2)

 Handouts:   7-1 Proposed Mitigation-  Document Excerpts
              7-2 Instructions for Review of Proposed Mitigation

 Other:       Case Studies
              Resource Manual (e.g., 1.5.7,1.5.15,1.7, 3.2)
 TEXT:
 4.6 Mitigation and Monitoring Measures
 PURPOSE:
To introduce a hierarchy of environmental impact mitigation types
To introduce the concept of mitigation effectiveness
To introduce a road map for mitigation review
To practice mitigation review on real environmental impact assessments
To add to the advice for reviewers of mitigation
 TIME BREAKDOWN:
 Part A  Types of Mitigation and Review
         of Proposed Mitigation               Group Discussion             10 minutes
 PartB  Mitigation Effectiveness              Group Discussion             10 minutes
 PartC  Approach to Mitigation Review        Group Discussion             15 minutes
 Part D  Review of Proposed Mitigation
         (includes break)                     Small Group Exercise          45 minutes
 Part E  Report-Out on Review of Proposed
         Mitigation Review                   Group Discussion             15 minutes
 PartF  Advice to Reviewers                 Group Discussion        "     05 minutes
PART A.    Types of Mitigation and Review of Coverage of Proposed Mitigation (Group
            Discussion, 10 min.)

    One of the important results we want from the environmental impact assessment process is
    the opportunity to avoid or mitigate adverse environmental impacts associated with a
    proposed project. The reviewer needs to consider:

      1)    Whether mitigation measures are included in the environmental impact assessment
            document or some other related documents);

                                        7-1                                July  1998

-------
Principles of Environmental Impact Assessment Review
Facilitator's Manual
       2)   Whether the proposed mitigation is complete;

       3)   Whether the mitigation is adequate and reflective of the significance of the
            environmental impact;

       4)   How effective mitigation -will be if implemented; and

       5)   How much selection of a preferred alternative depends upon the successful
            implementation of proposed mitigation;

    We will discuss these issues, as -well as explore the approaches a reviewer takes in
    evaluating the mitigation and monitoring plans.

    •  First, why would you want to include information about mitigation measures within an
       environmental impact assessment?

       Possible responses:   - Requirement as a condition of project approval
                           - Consideration in  the selection of the preferred alternative
                           - To enable the selection of a proposed alternative when it would
                           result in less impact to the environment
                           - The environmental impact assessment process itself facilitates the
                           identification of mitigation measures.

    •  Do mitigation measures have to address  opportunities to mitigate all adverse impacts to
       make it complete?

    Mitigation measures should be proposed for all primary, secondary and cumulative
    impacts, long term and short term, for all phases of a proposed project as relevant during
    the planning, design, construction, operation and/or closure phases of a proposed project,
    where it is reasonable and feasible both technically and economically to consider in the
    decision making on the proposed project.

    •  What importance does the significance of an environmental impact play in reviewer
       expectations for mitigation measures to be identified in the environmental impact
       assessment document?

    The significance of an environmental impact plays apart as well.  Most of the analysis and
    data  should focus on mitigating the more significant potential environmental impacts,
    rather than on potential impacts of lesser significance.
                                          7-2
         July  1998

-------
Principles of Environmental Impact Assessment Review	Facilitator's Manual

     *  What are some general options for mitigating adverse environmental impacts that might
       be identified in an environmental impact assessment?

ALLOW 3-5 SUGGESTIONS. THEN REVEAL FLIPCHART # 7-1 (HIERARCHY OF MITIGATION TYPES).

    Mitigation is a tool employed to avoid, reduce, or correct adverse environmental impacts,
    or to compensate for them after they have occurred.

    Let's review the different types of mitigation and how a reviewer would consider whether the
    proposed mitigation is complete:

READ ALL OF THE MITIGATION TYPES TO THE GROUP. INCLUDE THE MORE DETAILED LANGUAGE
PRESENTED HERE:

       •    Avoid or prevent the environmental impact altogether by not taking a certain
            action or parts of an action.

       •    Minimize environmental impacts by limiting the degree or magnitude of the action
            and its implementation.

       •    Reduce or eliminate the environmental impact over time by preservation and
            maintenance operations during the life of the project:

       •    Correct the environmental impact by repairing, rehabilitating, or restoring the
            existing environment.

       •    Compensate for the environmental impact by replacing or providing substitute
            resources or environments.

    You will notice that these mitigation types are presented in a specific order.  We have placed
    them in a hierarchy that orders them from the most desirable type of measure at the top to
    the least desirable type of measure at the bottom.  Why did we do this?

LISTEN TO PARTICIPANT RESPONSES.

    All mitigation measures are valid, but it is best to try to accomplish higher level measures
    before resorting to lower level measures; the reviewer should consider whether higher order
    mitigation opportunities were overlooked.

    Of course, more than one of these mitigation types can be implemented at the same time.
    For example, a project proponent may minimize an impact as much as possible, and then
    compensate for whatever remaining impact actually occurs.

                                          7-3                                July 1998

-------
Principles of Environmental Impact Assessment Review
Facilitator's Manual
    •  Who can give us an example from the course materials or from their own experience, of a
       mitigation measure that avoided or prevented an environmental impact?

    •  Haw about an example of a mitigation measure that minimized an environmental impact?

    •  How about an example of a mitigation measure that reduced or eliminated an impact?

    •  How about an example of a mitigation measure that corrected an environmental impact?

    •  Finally, haw about a mitigation measure that compensated for an environmental impact?

Coverage

    •   What information should be included in the mitigation component of the environmental
        impact assessment for it to be complete?

RECORD PARTICIPANTS' ANSWERS ON A BLANK FLIP CHART

        Possible responses:  - Description of the action
                           - Schedule for implementation
                           - Costs and sources of funding
                           - Benefits
                           - Feasibility assessment
                           - Mitigation proposed for all adverse primary, secondary, and
                           cumulative impacts
                           - Discussion reflects the significance of the adverse environmental
                           impact

                           Proposed mitigation measures follow the mitigation hierarchy.

PART B.    Mitigation Effectiveness (Group Discussion, 10 min.)

    We have discussed the types of mitigation measures that can be implemented, and ordered
    them from most to least desirable.  What we have not done yet is talk about how a reviewer
    can determine whether the proposed mitigation measures will be effective. This is
    something that reviewers must answer every time they review an environmental impact
    assessment. If mitigation measures are proposed, but would have little effect on actually
    mitigating an environmental impact, of •what value are they?

    Now let us discuss how to evaluate the information presented to determine the effectiveness
    of proposed mitigation.
                                         7-4
        July 1998

-------
Principles of Environmental Impact Assessment Review	Facilitator's Manual

TITLE A BLANK FLIP CHART "MITIGATION EFFECTIVENESS."

    •  What questions would you want answered to ensure that proposed mitigation measures
       will be effective?

RECORD PARTICIPANT RESPONSES ON THE FLIP CHART AND FACILITATE A DISCUSSION ABOUT
MITIGATION EFFECTIVENESS.

        Possible responses: - Whether the mitigation will do what it is credited with doing to
                           mitigate the environmental impacts
                           - Whether the mitigation actions are real and will be carried out: are
                           the mitigation measures clear and specific, or general and vague?
                           - Whether the mitigation measures are realistic, technically and
                           financially feasible and whether a similar mitigation measure has
                           been successfully utilized on a similar project
                           - Whether there is a high likelihood they can be implemented:
                           -    Are there adequate financial and non-financial resources to
                                 implement the measures?
                           -    Are the measures socially and culturally acceptable?
                           -     Are clear implementation plans provided, including schedules
                                 and interim milestones?
                           -     Are responsible parties identified and committed to
                                 implementation?

    •  Assuming proposed mitigation will be effective, will it be adequate? how much mitigation
       is necessary? Do all projected environmental impacts have to be mitigated down to zero
       impact?

ALLOW DISCUSSION TO LAST UP TO THREE MINUTES.

       Possible responses:   - A threshold for each affected resource must be set for mitigation
                           to be meaningful
                           - Often mitigating the last 5 percent of environmental impact is
                           more costly and difficult than the previous 95 percent of
                           environmental impact
                           - Reviewers need to be reasonable in their demands for
                           mitigation effectiveness (bearing the above in mind)
                           - There is a limit to the ability to mitigate or avoid all environmental
                           impacts.

    Country specific laws, regulations and criteria for determining significance must also be
    factored into the context for reviewing the mitigation component of an environmental impact

                                           7-5                                  July 1998

-------
 Principles of Environmental Impact Assessment Review
Facilitator's Manual
    assessment.  Appendix C.2 of the Student Text provides useful information in evaluating
    significance.

    •  Haw can you determine what kinds of mitigation measures are appropriate for different
       types of environmental impacts?

    This is an important question.  Understanding appropriate mitigation measures requires
    and understanding of the mitigation measure at issue, the type of impact that is being
    mitigated, and the type of affected environment.

Tools and Techniques

    The answer to this question is really beyond the ability of a solo reviewer to be able to
    answer unless you have had a lot of experience with that type of project. One thing you can
    do is empower yourselves with information and a network of experts you can draw upon.

REFER TO THE TOOLS AND TECHNIQUES ON FLIPCHART:

    To empower our solo reviewer, one  of the resources you can use is in the Resource Manual.
    An important resource you can use to identify potential mitigation is the "Project Specific
    Mitigation Measures" tables developed by the World Bank in Section 3.2 of the Resource
    Manual.  This document contains 160 pages of mitigation measures appropriate for specific
    types of environmental impacts. These tables were created by the World Bank.  They are
    broken dawn by topical area, such as Agroindustry, Dams and Reservoirs, Fisheries,
    Natural Forest Management, etc.

ALSO INFORM PARTICIPANTS THAT ADDITIONAL HELPFUL INFORMATION RELEVANT TO MITIGATION
AND MONITORING CAN BE FOUND IN THE FOLLOWING SECTIONS:

1.5.7    Impact Identification (needs and tools for impact mitigation).
1.5.15   Mitigation (a description of Council on Environmental Quality categories of mitigation
        and more description of needs and tools for impact mitigation).

DISCUSS HOW THIS TYPE OF  INFORMATION MAY BE USEFUL TO A REVIEWER IN UNDERSTANDING
THE DIFFERENT CONSIDERATIONS THAT HAVE BEEN MADE DURING THE ANALYSIS AND
DEVELOPMENT OF THE DOCUMENT.

    These are just a few examples of the kinds of resources that you can draw upon to help you
    conduct an effective review

    •  If the environmental impact assessment document does not adequately make the critical
       points you feel should be made, it is your duty to make your opinion known.
                                         7-6
        July 1998

-------
Principles of Environmental Impact Assessment Review	Facilitator's Manual
    Let's see how you would respond to some example proposals for mitigation from several
    environmental impact assessment documents:

DISTRIBUTE HANDOUT # 7-1 (MITIGATION - DOCUMENT EXCERPTS).

ASK FOR A VOLUNTEER TO READ EACH STATEMENT. AFTER EACH STATEMENT IS READ, FOCUS ON
GETTING PARTICIPANTS TO ANSWER THE FOLLOWING POINTS:

    1) WHETHER THE STATEMENT WAS SUFFICIENT OR INSUFFICIENT AND WHY;

    2) IF NOT SUFFICIENT, WHAT ADDITIONAL INFORMATION WOULD THEY WANT TO SEE?

    3) CIRCUMSTANCES IN WHICH THE STATEMENT MAY OR MAY NOT BE ACCEPTABLE.

ALLOW 5  MINUTES OF DISCUSSION FOR EACH STATEMENT. INCLUDE THE KEY POINTS IDENTIFIED
BELOW.

      Key points to address during discussion:

      Pollution           Compliance does not establish insignificance. The suitability of
      Control             local standards to adequately mitigate identified environmental
                          impacts must be evaluated. Local standards should be compared
                          with other standards if available.  In addition, the control
                          technology selected may have environmental impacts which must be
                          addressed.

      Flora and Fauna     The proposed mitigation must demonstrate that it is suitable to
                          local environmental conditions including factors such as climate,
                          hydrology, and use of native species.

      Socioeconomics     Undocumented potential actions, not under the direct control of the
                          agency responsible for the proposed project, cannot be used as the
                          basis for mitigating significant impacts resulting from the proposed
                          project. Specific employment characteristics (i.e., skilled versus
                          unskilled) of the affected population must be addressed in the
                          mitigation plan.
Integrity

    • What might a reviewer want to watch out for about the integrity of the proposed
      mitigation in the environmental impact assessment document?
                                         7-7                                July 1998

-------
Principles of Environmental Impact Assessment Review
Facilitator's Manual
    Without some assurance of implementation and follow up, approval of poorly conceived
    projects may be based upon promises of mitigation that are not realized

PART C.   Approach to Mitigation Review (Group Discussion, 25 min.)

    We have answered the questions why information about mitigation measures should be
    included in an environmental impact assessment document, what should be included, and
    what makes mitigation measures effective.

    All of the ideas we have discussed should be kept in mind when reviewing mitigation.  Our
    road map will help you remember these points and maintain your focus on what is important
    when you conduct your review.  It tracks with the six reviewer focus items that you as a
    reviewer should focus on throughout the review of an environmental impact assessment
    document.

POINT BRIEFLY TO THE REVIEWER'S FOCUS FLIPCHART POSTED ON THE WALL FROM SESSION 2.

REVEAL FLIPCHARTS # 7-2 (ROAD MAP FOR MITIGATION REVIEW (1)) AND # 7-3 (ROAD MAP FOR
MITIGATION REVIEW (2)). POST ON TWO FLIPCHART STANDS so THAT BOTH ARE SIMULTANEOUSLY
VISIBLE.
Road Map:
            Specific mitigation measures are proposed

            All significant adverse environmental impacts are addressed by the mitigation plan

            Measures are proposed for:
               AH types of environmental impacts
               All phases of the project
               All environment types

            Preferred mitigation measures at the top of the mitigation type hierarchy are
            considered

            Mitigation measures are described in sufficient detail relative to the significance of
            environmental impact

            Mitigation measures are:
               Technically and financially feasible with adequate financial and non-financial
               resources to implement the measures
               Socially and culturally acceptable
                                        7-8
        July 1998

-------
Principles of Environmental Impact Assessment Review	Facilitator's Manual

       •    Implementation plans include schedules and interim milestones, and timing is
            consistent with other factors presented in the assessment of impact

       •    Responsible parties are identified and committed to implementation.

       •    Are there any questions about this Road Map?

ANSWER ANY QUESTIONS ABOUT THE ROAD MAP. IN ANSWERING QUESTIONS, REFER
PARTICIPANTS WHEREVER POSSIBLE BACK TO THE FLIP CHARTS THEY HELPED CREATE DURING
PARTS A AND B. IN ADDITION, MENTION THAT THIS ROAD MAP CAN BE FOUND IN SECTION 4.6.1 OF
THE STUDENT TEXT.

    Please keep the World Bank tables and the other documents in the Resource Manual in
    mind, as well as our Road Map and other tools and techniques, when we engage in a small
    group exercise to review the mitigation chapters of our environmental impact assessment
    case study documents.

FART D.   Review of Proposed Mitigation (Small Group Exercise, 30 min., plus a fifteen
            minute break if adequate time remains).

    We will now break into our case study review groups to review the proposed mitigation
    within the case study environmental impact assessments.  After reviewing your case studies
   for approximately 30 minutes, if time remains, feel free to take up to a fifteen minute break
    before re-convening.

DISTRIBUTE HANDOUT # 7-2 (INSTRUCTIONS FOR REVIEW OF PROPOSED MITIGATION).

    In conducting your review, assume the environmental impact assessment is required to
    identify mitigation options for each alternative. Refer to the Road Map we have created to
    keep your review focused and effective, as well as the tools and techniques we presented in
    Session 3. Also, feel free to use the World Bank tables, or other resources available in the
    Resource Manual.

    You will have a total of thirty minutes  to conduct this review of mitigation, forty-five minutes
    if you choose not to take a break.  The approach is the same as in the other sessions.

ANSWER ANY QUESTIONS THE PARTICIPANTS HAVE ON THE ASSIGNMENT.

    // is now	. Your small groups will have until	(45 minutes from now) to review
    this element of the environmental impact assessment, discuss your observations and
    questions, and prepare your reports. I will announce when 10 minutes are left so you will
    know how to structure your remaining time.

                                         7-9                                July 1998

-------
Principles of Environmental Impact Assessment Review
Facilitator's Manual
DURING THE ACTIVITY, YOU SHOULD DO THE FOLLOWING THINGS:

*   MONITOR TIME AND EITHER MAKE VERBAL ANNOUNCEMENTS OF OR POST THE TIME
    REMAINING;

•   CIRCULATE TO ENSURE SMALL GROUPS FOCUS ON REVIEWING MITIGATION;

•   CLARIFY ANY CONFUSION THE PARTICIPANTS HAVE ABOUT THE INSTRUCTIONS OR THE REVIEW
    PROCESS;

•   DETERMINE THE ORDER OF THE SMALL GROUP'S REPORT PRESENTATIONS;

•   TEN MINUTES. BEFORE THE END OF THE ACTIVITY, ANNOUNCE THE TIME REMAINING;

•   FIVE MINUTES BEFORE THE END OF THE ACTIVITY, DIRECT EACH GROUP TO ELECT A
    SPOKESPERSON WHO HAS NOT PREVIOUSLY PRESENTED.


PartE.     Report-Out on Review of Proposed Mitigation (Group Discussion, 15 min.)

    Okay, it is time to re-convene and discuss the results of your review of Mitigation.
    BRIEFLY summarize your major findings. Please keep your presentations to less than
    THREE MINUTES if possible.

POINT TO THE ROAD MAP POSTED ON THE WALL AND DIRECT THEM TO FOCUS ON ROAD MAP ITEMS
AS MUCH AS POSSIBLE.

ENCOURAGE THE PARTICIPANTS TO ASK QUESTIONS FOLLOWING EACH REPORT.

    Now that you have had the experience of reviewing the mitigation portion of environmental
    impact assessment documents, let us review the process you used and the range of situations
    you may find yourself in.

    • Was the Road Map helpful? Did anyone use or refer to  it? How would you modify it to
      better reflect your approach to the review?  Were the other tools and techniques and
      reference materials helpful? Were you able to keep focused on what you identified as the
      most significant concerns?  What other information or resources -wouldyou have liked to
      have?

UPDATE ROAD MAP BASED ON PARTICIPANT COMMENTS.
                                      7-10
        July 1998

-------
Principles of Environmental Impact Assessment Review	Facilitator's Manual

    •  What other portions of the document might be relevant in reviewing this portion of the
       environmental impact assessment?

    Now I would like to ask you how you think your review of mitigation would have gone in
    each of the other review situations we discussed earlier. Specifically,

THE PURPOSE OF THIS PART OF THE EXERCISE is TO GET PARTICIPANTS THINKING ABOUT THESE
DIFFERENT REVIEWER SCENARIOS. IT IS NOT NECESSARY TO RECORD RESPONSES.

    •  What if you had been in a position to be a proactive reviewer?  What if the project
      proponent had come to you, or you to them, early in the process — say, prior to the
       identification of mitigation options. What if you were able to make suggestions about
       how the proponent could select mitigation measures?

    • How would your review be different if you were able to call upon other experts? Are
       there other resources or sources of information that you have not yet mentioned that
       would allow you to most effectively conduct your review?

REFER BACK TO THE LIST OF TOOLS AND TECHNIQUES

PART F.   Advice to Reviewers (Group Discussion, 5 min.)

    •  What lessons or advice to other reviewers would you give after having gone through this
      .portion of the review?

ADD TO "ADVICE TO REVIEWERS" LIST AS APPROPRIATE, OR REEMPHASIZE POINTS ALREADY MADE.

ALLOW DISCUSSION FOR 2-3 MINUTES.

    •  What specific examples of these issues have you seen or heard about in real situations?

CONTINUE THE DISCUSSION FOR APPROXIMATELY ANOTHER MINUTE. RECORD THE PARTICIPANT'S
COMMENTS ON THE FLIPCHART.  REFER TO THE ROAD MAP. THE ADVISE TO REVIEWERS LIST ITEMS
SHOULD BE CLOSELY RELATED TO IT.

CLOSE THE SESSION FOR THE DAY.

    • Does any one have any questions about the review process we have covered so far?

TOMORROW WE WILL APPLY THE INFORMATION WE HAVE DISCUSSED DURING THE REVIEW OF
INDIVIDUAL ELEMENTS OF AN ENVIRONMENTAL IMPACT ASSESSMENT TO THE REVIEW OF A DRAFT
DOCUMENT AS A WHOLE.

                                       7-11                               July  1998

-------
Principles of Environmental Impact Assessment Review
Facilitator's Manual
    Our next session will be on reviewing a draft environmental impact assessment document.
    [NAME OF NEXT FACILITATOR] will lead us through this step in the EIA process. In
    the next session, we will begin a comprehensive review of a draft EIA in its entirety that we
    will continue for the remainder of the course.
                                        7-12
        July 1998

-------
Principles of Environmental Impact Assessment Review
                                                  Facilitator's Manual
     SESSION 8A: INTRODUCTION TO PREPARING AND COMMUNICATING
 REVIEWER COMMENTS ON A DRAFT ENVIRONMENTAL IMPACT ASSESSMENT
 MATERIALS:                                     TIME:
 Flip charts:   3-1 Road Map for Overall Review (1)   SETTING:
              3-2 Road Map for Overall Review (2)
              8-1 Road Map for Review of Draft Environmental
              Impact Assessment

 Handouts:    8-1 Instructions for Management Plan Development
                                             1 hour
                                             Group discussion
                                              Small group exercise
 Other:
Case Studies
 TEXT:
 3.3   Reviewers and Review Teams
 3.4   Reviewer's Role in Each Element of the Environmental Impact Assessment Process
 3.4.2  Scoping: Environmental Impact Assessment Document Development
 4.1   Approaches to Review: Analyzing the Elements of the Environmental Impact
       Assessment
 Appendix E   Road Maps and Tools and Techniques
 PURPOSE:   •  Introduce participants to the integrated review of the draft case study
                 environmental impact assessments
              •  Experience role of lead reviewer and review team organization and planning
                 concepts in design and implementation of a management plan
              •  Begin comprehensive and integrated review of a draft environmental impact
                 assessment in its entirety.
 TIME BREAKDOWN:
 Part A. Draft Environmental Impact
        Assessment Review
 PartB. Development of a Management Plan
                               Group Discussion
                               Small Group Exercise
IS minutes
45 minutes
Part A. Draft Environmental Impact Assessment Review (Group Discussion 15 min.)

 Over the past two days we have reviewed individual sections of four draft environmental impact
 assessments.  We mil new have an opportunity to review and comment on the draft documents
 in their entirety. Do you recall the road map for overall review of a draft environmental
 impact assessment introduced on the first day of the course?

REFER TO FLIPCHARTS #3-1 AND # 3-2 (ROAD MAP FOR OVERALL ENVIRONMENTAL IMPACT
ASSESSMENT REVIEW (1) AND (2)), POINT our ELEMENT BY ELEMENT APPROACH.
                                      8A-1
                                                          May 1998

-------
Princioles of Environmental Impact Assessment Review
Facilitator's Manual
 Back in Session 3 we simply scanned the document for significant environmental impacts and
 only looked briefly at documented scoping of issues and interested parties.

Advantages of integrated review

 •   What are the advantages of reviewing the entire document now that we are more familiar
     with the individual components?

     Possible responses:    - Evaluate the flow and consistency of information and the
                         integration of the document and the process in a way that cannot be
                         done in isolation
                         - Review the internal logic (integrity) of the data presented and the
                         analysis conducted
                         - Identify the most significant issues, concerns, and questions
                         - Review the breadth of any data gaps.

 An integrated review helps to identify' significant issues, common themes, internal logic, and
 consistency of assumptions.

POINT OUT AND REVIEW BRIEFLY THE DIFFERENT APPROACHES TO OVERALL REVIEW.

REVEAL FLIPCHART 8-1 (ROAD MAP FOR DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REVIEW)
SO THAT BOTH THE ROAD MAP FOR OVERALL REVIEW AND ROAD MAP FOR DRAFT REVIEW ARE
VISIBLE.

DISTRIBUTE HANDOUT #8-1 (INSTRUCTIONS FOR CASE STUDY REVIEW).

Draft Environmental Impact Assessment Review Assignments

 Today and tomorrow you will be completing five tasks related to review of your draft
 environmental impact assessment documents. You will:

 1) Develop a management plan designating the lead and associate reviewers and their roles,
 products and schedule;

 2) Implement the management plan;

 3) Conduct an integrated review and identify the most significant issues;

 4) Communicate the results of the review; and

 5) Consider public comments on the proposed project.
                                        8A-2
        May 1998

-------
Principles of Environmental Impact Assessment Review	Facilitator's Manual
 We will begin now with the first task and resume with our group discussion tomorrow morning.

 The first task which you will do now, before you leave for the evening, is to prepare a
 management plan which will provide your group with an opportunity to experience a "lead
 reviewer " situation.  You will be able to organize your group to maximize your reviewing
 capabilities and access to available resources.

  This plan must;

     »  Assign specific review roles to all group members, including the role of the lead
        reviewer and associate reviewers; and

     •  Establish a process to integrate the comments (i.e., subject matter integration).

 In this lead review situation, you need to determine how you will

     •  Use the maximum amount of the resources at your disposal (e.g., group members, past
        review comments, Resource Manual information, Student Text);

     •  Consider the past comments you have made; and

     •  Consider any new comments that are identified, particularly based on a new perspective
        of the entire document.

 After our group discussion, you will convene your groups and develop the management plan.
 By developing the management plan now, you will be able to decide how to best use your time
 this evening. Some of you may want to get a head start reading through the draft again more
 thoroughly so that you have more time to conduct this portion of the review.

 Tomorrow morning, we will convene at 8:30 as usual as a larger group to review your
 assignments and introduce our road map for effective preparation and communication of
 reviewer comments. You will then have time to:

     •   Complete the lead and associate reviewer roles and implement the management plan
       you developed;

     •   Step back from your individual roles and look at the  "big picture " together as a group
        to identify significant issues; and
     •  Develop your comment letter.

 You will be presenting your comment letters right after lunch.

                                         8A-3                                May 1998

-------
Principles of Environmental Impact Assessment Review
Facilitator's Manual
 *   Are there any questions about what you are being asked to do before we wrap up tonight?

 «   Any questions about what we covered today?

PART B.    Development of a Management Plan (Small Group Exercise, 45 min.)

 Each group will have about 45 minutes for development of your management plan. All of the
 facilitators will be available during the review to assist you.

DISTRIBUTE HANDOUT # 8-1 (INSTRUCTIONS FOR MANAGEMENT PLAN DEVELOPMENT).

DURING THE EXERCISE, CIRCULATE THROUGHOUT THE ROOM TO DETERMINE IF THE PARTICIPANTS
ARE HAVING ANY DIFFICULTIES OR ANY QUESTIONS ABOUT DEVELOPING A MANAGEMENT PLAN.
                                      8A-4
        May 1998

-------
Principles of Environmental Impact Assessment Review
 Facilitator's Manual
         SESSION 8B: PREPARING AND COMMUNICATING REVIEWER
      COMMENTS ON A DRAFT ENVIRONMENTAL IMPACT ASSESSMENT
 MATERIALS:                                    TIME:
 Flipcharts:   3-1 Road Map for Overall Review (1)
             3-2 Road Map for Overall Review (2)
             8-1 Road Map for Review of Draft     SETTING:
             Environmental Impact Assessment
             8-2 Road Map for the Communication Letter
1 hour Day 2 (see
Session 8A)
6.0 hours Day 3
Group discussion
Small group
exercise
 Handouts:   8-1 Instructions for Management Plan Development (Session 8A)
             8-2 Road Maps and Tools and Techniques
             8-3 Instructions for Communication Letter Development
             8-4 Selected Public Comment for Each Case Study

 Other:      Case Studies
             Resource Manual (e.g., 1.5.17)
 TEXT:
 3.3    Reviewers and Review Teams
 3.4    Reviewer's Role in Each Element of the Environmental Impact Assessment Process
 3.4.2  Scoping:  Environmental Impact Assessment Document Development
 4.1    Approaches to Review: Analyzing the Elements of the Environmental Impact
       Assessment
 Appendix A  Environmental Impact Assessment Evaluation Checklist
 Appendix E  Road Maps and Tools and Techniques
 PURPOSE:  •  To apply lead reviewer and review team organization and planning concepts
                in design and implementation of a management plan
             •  To conduct a comprehensive and integrated review of a complete
               . environmental impact assessment
             •  To develop a comment letter and understand what makes for effective
                communication of comments
             •  To consider the implications of public comments and concerns.
                                      8B-1
          July 1998

-------
Principles of Environmental Impact Assessment Review
                                                                Facilitator's Manual
 TIME BREAKDOWN:
 Day 2:
           Draft Environmental Impact Assessment Review (see Session 8A)
           Development of Management Plan (see Session 8A)
Part A.
PartB
Day3
PartC
           Preparing and Communicating Reviewer
           Comments (including lunch)               Small Group Exercise
 Part D    Review of Comment Letters Report-out     Group Discussion
 Part E    Discussion of Public Comments            Group Discussion
                                                                      270 minutes
                                                                      60 minutes
                                                                      30 minutes
NOTE: THIS SESSION BEGINS WITH PART C BECAUSE PARTS A AND B WERE COVERED IN SESSION
8A YESTERDAY.

PART C.  Preparing and Communicating Reviewer Comments (4.5 hours, including a one
          hour lunch).

   Let me give you a quick overview of what we will be doing this morning. First, you will have
   4.5 hours to prepare your reviewer comments. Then, after an hour lunch, you will need to be
   back at one o 'clock to report out on your comment letters.

   1 would like to focus our remaining group discussion time to discuss preparing and
   communicating comments.

   We would like you to be able to anticipate all aspects of the development of comments on the
   draft as you move through this task.  We have not really focused on the issue of
   communication yet.

   •  Can you think of ways to approach writing the comment letter that would overcome some
      of the possible problems in communicating your concerns, issues, and questions?

RECORD ON BLANK FLIPCHART TITLED " WRITING COMMENT LETTERS"
      Possible responses:
                         - Summarize similar comments into a single comment
                         - Resolve conflicting comments
                         - Identify which comments are mandatory actions and which are
                         recommendations
                         - Explain the basis for each comment instead of simply listing them
                         - Link procedural concerns to environmental concerns
                         - Explain the significance of the comment
                         - Provide a context for the review comments in the comment letter.
                                       8B-2
                                                                         July 1998

-------
Principles of Environmental Impact Assessment Review	Facilitator's Manual

REVEAL FLffCHART 8-2 (ROAD MAP FOR THE COMMUNICATION LETTER).  DISCUSS THE ITEMS
LISTED. ASK THE PARTICIPANTS IF THERE IS ANYTHING THEY WOULD LIKE TO ADD OR AMEND.

Road Map

       •   State bottom line including major recommendations up front and clearly

       •   Describe proposed project context

       •   If the purpose and need of the proposed project is in question, develop the link to the
          environmental concerns

       •   Distinguish what is mandatory, what is significant

       •   Provide a description of the substantive and/or procedural concerns

       •   Demonstrate sensitivity to interests and affected community

       •   Provide recommendations for addressing the concerns

   When framing the letter, remember:

       1) It is important to have a context for the comments;

       2) An overall assessment of the document should be the first paragraph;

       3) The most important comments should come before those of lessor importance;

      Remember that we are trying to get the decision maker and the project proponent to
       improve or correct the document, so it is important to make specific recommendations on
      what they should do. Remember how your comments and their delivery can affect the
      extent to which you can influence how a project proponent orpreparer of the
      environmental impact assessment will respond to them.

       4) Be clear to distinguish:
          •  What is needed in the document and why?
          •  What will be mandatory to conform to specific legal requirements?
          •  What will be discretionary but of significance to decision making?
          *  What will the consequences be for going forward with the proposed project?
                                        8B-3                               July 1998

-------
Principles of Environmental Impact Assessment Review
Facilitator's Manual
          •  Consider the different perspectives of the different parties involved and/or
             affected by the proposed project (e.g., the project proponents of the document, the
             affected and interested parties, your agency).

       5) Communicate the results of your review in a concise and clear set of statements.

   Sometimes when you have many levels and types of comments it becomes difficult to convey
   haw serious your comments are to the future approval of the proposed project as planned, or
   to the acceptance of a final approved environmental impact assessment.  Countries and
   organizations sometimes have key words they use to signal the meaning of their comments
   and how seriously they are made. In one way or another these are designed to convey what
   is accomplished through the rating system used within the  United States to clearly express
   the intent and overall findings of the review.  The U.S. Environmental Protection Agency
   rating system criteria for review of draft environmental impact assessments is described in
   section 1.5.17 of the Resource Manual.  The system provides criteria for assessing the
   environmental impact of an action and the adequacy of the document. In this system the
   environmental impact of the proposed project is rated as lack of objections, environmental
   concerns, environmental objections, or environmentally unsatisfactory.  The system also
   rates the overall adequacy of the document using the following categories: adequate,
   insufficient information, and inadequate.  The rating system has enabled comments to be
   conveyed in a consistent manor to document preparers.

   Adda brief explanation.  Keep in mind your choice of words and what they convey about the
   comments as a whole. Remember, each group will have three and a half hours to develop the
   comment letter.

   When you report out after lunch today, each group will present its comment letter. Please
   actually write out and be prepared to read the introductory paragraph that summarizes the
   "bottom line, " and develop specific recommendations that you would like to see carried out
   recorded on flipcharts. Also, be prepared to discuss your management approach, assigned
   roles, and to evaluate its success.

   We will discuss the response to public comments on the review process after each group has
   conducted its presentation.

   DISTRIBUTE HANDOUT # 8-2 (ROAD MAPS AND TOOLS AND TECHNIQUES;
   DISTRIBUTE HANDOUT # 8-3 (INSTRUCTIONS FOR COMMENT LETTER DEVELOPMENT)

   lam distributing a compilation of the road maps we have been discussing for the past two
   days to assist you in keeping in focus as you review the document.  There is a road map for
   each component of the review: overall review; purpose and need and alternatives; describing
   the environmental setting; environmental impacts; and mitigation. All road maps are also
                                        SB-4
         July 1998

-------
Principles of Environmental Impact Assessment Review	Facilitator's Manual

   located in Appendix E of your Student Text. I am also distributing instructions to guide you
   in developing the Comment Letter.

   Remember to use the information included in your Resource Manual for tools such as
   checklists, impact assessment methodologies, and the U.S. Environmental Protection Agency
   rating system. You may want to use the checklists you have used throughout the earlier
   sessions to identify additional review comments.

AT 12:00, NOTIFY THE GROUPS THAT THEY SHOULD BREAK FOR LUNCH. INDICATE THAT THEY
SHOULD RETURN PROMPTLY IN ONE HOUR AND BE PREPARED TO REPORT OUT ON THE COMMENT
LETTERS THEY HAVE PREPARED.

Part D.   Review of Comment Letters Report Out (Group Discussion, 60 min.)

ASK THE GROUPS TO REPORT OUT ONE AT A TIME. ALLOW EACH GROUP A MAXIMUM OF 15
MINUTES.  YOU WILL NEED THE REMAINING TIME FOR A GENERAL DISCUSSION AT THE CLOSE OF
THIS SECTION.

HAVE EACH GROUP:

•  READ THE INTRODUCTORY PARAGRAPH OF rrs COMMENT LETTER;

•  REVIEW THE SIGNIFICANT ISSUES THE GROUP LISTED ON A FLEPCHART.

ASK THE GROUPS TO EXPLAIN:

•  IF THEY eENTIFIED ANY NEW ISSUES CONDUCTING THE REVIEW THIS TIME;

•  THE TYPES OF COMMENTS THEY DEEMED SIGNIFICANT, WHETHER THEY HAD DIFFERENT
 .  OPINIONS, AND WHY;

•  THE TYPES OF ISSUES WITH THE INTEGRITY OF THE DOCUMENT AND ANALYSIS THAT THEY
   IDENTIFIED;

•  THE TYPES OF MANDATORY ACTIONS THEY CONSIDERED;

•  THE DIFFERENT PERSPECTIVES AND THE ISSUES OF CONCERN THEY CONSIDERED;

•  WHAT BECAME CLEARER WHEN THEY READ THE DOCUMENT AS A WHOLE INSTEAD OF IN PARTS;
   AND

•  HOW THE DIFFERENT SECTIONS RELATED.

                                     8B-5                              My 1998

-------
Principles of Environmental Impact Assessment Review
Facilitator's Manual
ASK THE PARTICIPANTS TO LISTEN TO EACH GROUP AND DETERMINE IF THEY BELIEVE THE
ENVIRONMENTAL IMPACT ASSESSMENT AND THE GOVERNMENT HAVE ADDRESSED THE CONCERNS
THE PUBLIC MAY HAVE ON THIS PROPOSED ACTION.

ALSO ASK THE GROUPS TO EXPLAIN:

•  HOW THEY ORGANIZED THEMSELVES FOR THE REVIEW, AND WHY THEY SELECTED THAT
   APPROACH.

*  WHAT WORKED?

•  WHAT DID NOT WORK?

AFTER ALL GROUPS HAVE REPORTED, LEAD A BRIEF DISCUSSION ON THE DIFFERENCES IN RESULTS
FROM SESSION 3 AND SESSION 8.

   *  Did any groups have the same comments at the end of the detailed reviews that they had
      at the beginning? How were the comments different? Which were of greatest use to the
      decision maker?

Often, the review of the draft environmental impact assessment and preparation of the Comment
Letter is the most demanding and time-sensitive aspect of reviews. This is an excellent time to
have lots of help. When you conducted this review you had a team of reviewers with specific
assignments. You developed a comment letter and provided it to the preparers of the
environmental impact assessment. They will now respond to your comments by conducting any
additional data collection and analysis you have required and revise the document accordingly.

   •  If you were able to be "Proactive" in this situation, how could you conduct your job?
      How would your actions be different at this point in time? How would it affect your
      overall management strategy? What would the benefits be?

Part E.    Discussion of Public Comment (Group Discussion, 30 min.)

Frequently, you may not be the only reviewer of a document or the only individual with
comments regarding the proposed project.  The public and affected and interested parties may
also comment.  You may receive their comments in many formats (e.g., letters, newspaper
articles, public meetings).

I am going to distribute the final environmental impact assessment documents for each case
study to everyone and I am going to give each group a new assignment with a new case study.
                                        8B-6
         July 1998

-------
Principles of Environmental Impact Assessment Review 	Facilitator's Manual

Your assignment mil be to review the public comment summary included in the final document
and represent the public's point of view about the action,

DISTRIBUTE HANDOUT # 8-4 (SELECTED PUBLIC COMMENT FOR EACH CASE STUDY). PROVIDE
THE PUBLIC COMMENT FOR CASE STUDY 1 TO GROUP 2, FOR CASE STUDY 2 TO GROUP 3, FOR CASE
STUDY 3 TO GROUP 4 AND FOR CASE STUDY 4 TO GROUP 1. FOR EXAMPLE, IF THE GROUP REVIEWED
A "TRANSPORTATION" PROJECT THEN IT SHOULD BE ASSIGNED THE "HARBOR" PROJECT TO REVIEW
THE PUBLIC COMMENTS.

    Please take the next 10 minutes to individually review the public comment summary that has
    been assigned to your group and discuss hew your group will "represent the public."
    Consider the information presented by the review group when it presented their comments.
    Did the document and/or the government's review fully address the public's concerns?

DISCUSS EACH CASE STUDY INDIVIDUALLY.  ASK THE PARTICIPANTS TO RAISE THE PUBLIC
CONCERNS AND COMMENTS TO THE REVIEW GROUP. LIMIT THE DISCUSSION TO 10 MINUTES FOR
THE DISCUSSION BY ALL GROUPS.

AFTER GROUPS HAVE HAD THE OPPORTUNITY TO REVIEW PUBLIC COMMENTS, ASK THE REVIEW
GROUPS HOW THEIR REVIEW AND COMMENT LETTER MAY HAVE BEEN DIFFERENT IF THEY HAD BEEN
AWARE OF THE PUBLIC COMMENTS AND CONCERNS. SOLICIT ANY ADDITIONAL FEEDBACK FROM
THE REST OF THE PARTICIPANTS.

    •   Would your comments have been different if you had known the public comments in
      advance? How would you address an issue that is receiving a lot of very vocal public
      concern?

      Possible responses:   - Take on a new perspective to consider the effect of the proposed
                         project, environmental impacts,  and mitigation on affected parties
                         - Identify a significance area of concern to the public that may
                         become a controversial issue or a political problem
                         - Enable the reviewer to ensure the comments reflect an appropriate
                         level of detail and significance to the issue
                         - Ensure the communication strategy is sensitive to the concerns so
                         that accurate information may be disseminated.
REFER TO THE ADVICE TO REVIEWER'S FLIPCHART.  USE THE REMAINING 10 MINUTES IN THE
SESSION TO DEVELOP ADDITIONAL ADVICE TO REVIEWERS OR TO EMPHASIZE PREVIOUSLY
DEVELOPED ADVICE.
                                      8B-7                               July 1998

-------
Principles of Environmental Impact Assessment Review
                                        Facilitator's Manual
Now that we have gone through the review and seen some of the influence public comments can
have on the process, are there other things that you should watch for in a review of a draft
environmental impact assessment? What might they be?

RECORD RESPONSES ON THE ADVICE TO REVIEWERS FLIPCHART.

       Possible responses:   - Issues presented as major concerns are not adequately addressed
                          - Issues that may appear to be of lessor significance in any one
                          component of the document could be relevant throughout the
                          document and hence have a greater significance to the proposed
                          project as a whole
                          - Considering the perspectives of interested parties, decision
                          makers, and others provides insight into the relative significance of
                          issues for individuals with different, perspectives.

ADD COMMENTS TO THE ADVICE TO REVIEWERS FLIPCHART FROM THE FOLLOWING DISCUSSION,

   How can the reviewer promote the greatest implementation of the comments and suggestions
   made in the letter?
      Possible responses:
- Clear, unambiguous language
• Strong justification and support for statements made and
significance assigned
- Maintain the "big picture" view of the document but include
specific references to examples of the issues within the document
- Fair and objective language and terms.
DISCUSS THESE IN TERMS OF WHAT REVIEWERS NEED TO WATCH OUT FOR DURING THE
DEVELOPMENT OF THE COMMENT LETTER.

THINGS TO CONSIDER COULD INCLUDE:

   •  UNSUBSTANTIATED COMMENTS
   ARGUMENTATIVE OR THREATENING LANGUAGE

   •  COMMENTS SWAYED BY PUBLIC COMMENT OR POLITICAL PRESSURE WITH NO RELATIONSHIP
      TO THE ACTUAL REVIEW FINDINGS

   •  UNCLEAR OR ILL DEFINED ACTION ITEMS OR TIME FRAMES.

BE SURE TO POST BOTH ROAD MAP FLIPCHARTS # 8-1 AND # 8-2 ON THE WALLS AT THE END OF THE
SESSION.
                                       8B-8
                                                 July 1998

-------
Principles of Environmental Impact Assessment Review
                                                               Facilitator's Manual
SESSION 9: REVIEWING A FINAL ENVIRONMENTAL IMPACT ASSESSMENT FOR
                           RESPONSE TO COMMENTS
                                                           2.5 hours
                                                           Group discussion
                                                           Small group exercise
MATERIALS:                                    TIME:
Flip charts:     9-1 Road Map for Final            SETTING:
               Environmental Impact
               Assessment Review (1)
               9-2 Road Map for Final
               Environmental Impact
               Assessment Review (2)
 Handouts:      9-1 Instructions for Review of Final Environmental Impact Assessment

 Other:         Final case study environmental impact assessment documents to be
                distributed to case study groups
 TEXT:
 3.4.3 Involving Stakeholders and Other Interested Parties
 3.4.5 Final Environmental Impact Assessment Documents
 4.   Evaluation of an Environmental Impact Assessment Document
 PURPOSE:
                  To evaluate how comments (public and government) are addressed in the
                  final document
                  To review the document for significant changes
                  To practice review of environmental impacts on real environmental
                  impact assessment documents.
 TIME BREAKDOWN:
 Part A  Final Environmental Impact Assessment
         Review Introduction
 Part B  Final Environmental Impact Assessment
         Review
 Part C  Report-Out on the Final Environmental Impact
 PartD
        Assessment Review
        Advice to Reviewers
Group Discussion

Small Group

Group Discussion
Group Discussion
15 minutes

90 minutes

40 minutes
05 minutes
PART A. Final Environmental Impact Assessment Review Introduction (Group
         Discussion, 15 min.)

   Are there any questions about what we have covered thus far? Are we ready to proceed to
   review of a final environmental impact assessment document? Are you curious about how
   your comments may have been responded to had they been for real?
                                       9-1
                                                                       July  1998

-------
Principles of Environmental Impact Assessment Review
Facilitator's Manual
    •   How might review of the final .environmental impact assessment be different from the
       review of the draft?

       Possible responses:   - You will be familiar with the process that has been followed and
                          the content of the document
                          - Expect to see certain changes in the final document, hopefully
                          making it an improvement on the draft.

DISTRIBUTE COPIES OF THE FINAL DOCUMENTS FOR ALL CASE STUDIES TO ALL PARTICIPANTS AT
THIS TIME.

    We mil now give you the final versions of all the draft documents you have reviewed so
   far. These final environmental impact assessments have changed to respond to comments
    received during the comment period, but the changes that have been made do not necessarily
    reflect all of your comments or comments by others, such as the public comments we just
    discussed.

    In this session, -we will review the document for the changes that have been made in response
    to comments, and tomorrow we will use the final environmental impact assessment and
    results of our analysis as the foundation for developing the Record of Decision and the
    Mitigation Plan.

POST FLIPCHARTS # 9-1 (ROAD MAP FOR FINAL ENVIRONMENTAL IMPACT ASSESSMENT REVIEW
(1)) AND # 9-2 (ROAD MAP FOR FINAL ENVIRONMENTAL IMPACT ASSESSMENT REVIEW (2)). WALK
THE GROUP THROUGH THE ROAD MAP, ALLOWING QUESTIONS, TO MAKE SURE ALL CONCEPTS ARE
UNDERSTOOD.

    Let us start by looking at what we should focus on when reviewing the final environmental
    impact assessment.

    As before, we have a Road Map that has been developed by previous groups who have gone
    through this training. These are some of the ideas they have come up with.

Road Map

       •  Establish a management approach

       •  Determine if basic assumptions and information are the same for draft and final
         documents

       •  Assess effects of any changes on alternatives, impacts and proposed mitigation
                                        9-2
        July 1998

-------
Principles of Environmental Impact Assessment Review	Facilitator's Manual

       •  Verify that comments were acknowledged and addressed

       *  Review the relationship and consistency among responses to individual comments

       *  Consolidate comments and prepare the final comment letter

       •  Determine "whether responses change fundamental reviewer findings:
          -  Acceptability of environmental impact
          -  Needed mitigation
          -  Adequacy of environmental impact assessment document and process
             Who needs to be involved and consulted

       *  Decide actions to increase chance of correcting remaining deficiencies

       •  Anticipate use by decision maker

       •  Anticipate use to establish mitigation requirements

       •  If appropriate, prepare final comment letter.
    •   Does anyone have anything they would like to add to this list - either a new topic or to
       amend something already listed?

AMEND THE FLIPCHART AS NEEDED.

Part B    Final Environmental Impact Assessment Review (Small Group Case Study
          Review, 90 min., includes informal break)

    We are going to spend the rest of the afternoon reviewing the final documents, and we will
   review them to evaluate how they responded to comments and whether they included any
   additional information.

   In conducting your review, you should stay in your small workgroups.

NOTE TO FACILITATORS: IF SOME OF THE PARTICIPANTS EXPRESS A STRONG DESIRE TO CHANGE
CASE STUDIES, THIS IS A GOOD POINT TO DO IT. BE CERTAIN TO KEEP AT LEAST ONE PERSON
LOOKING AT THE SAME DOCUMENT TO MAINTAIN SOME CONTINUITY. MAKE IT CLEAR THAT THEY
SHOULD STAY IN THE GROUP FOR THE REMAINDER OF THE CLASS.

DISTRIBUTE HANDOUT #9-1 (INSTRUCTIONS FOR REVIEW OF FINAL ENVIRONMENTAL IMPACT
ASSESSMENT^

                                        9-3                               July 1998

-------
Principles of Environmental Impact Assessment Review
Facilitator's Manual
   Let me explain what I would like you to do in this exercise:

   1) Develop apian on haw you are going to conduct the review (the documents are quite long,
   and no one person will have the time to review them all);

   2) Conduct the review, and summarize your comments. Use your experience with the draft
   environmental impact assessment review to develop your management plan for this review;

   3) Determine what has been included in the final document, how well you feel it addresses
   the issues you identified, and specifically, how well it addresses the comments in the official
   comment letter on the draft (i.e., from EPA).

   Please take a moment to glance at the official comment letter, not necessarily as a particular
   model for preparing comments, but perhaps to trigger some of your own ideas. Comments
   you made that may not be included in this letter ARE valid and you should consider whether
   you find that the final document resolves the issuesyou identified.  In addition, I would like
   to add one other caution. Anticipate using the document for decision making tomorrow as
   well

   I suggest that you take about 15 minutes to get organized, then have people work on their
   assignments. In about 60 minutes, please get together to summarize your major conclusions
   on the document and outline the key comments.

   •   Does anyone have any questions?

REMIND EACH GROUP IN 60 MINUTES THEY SHOULD RECONVENE TO SUMMARIZE THEIR
CONCLUSIONS. REMIND THEM AGAIN WHEN THERE is ABOUT 10 MINUTES LEFT BEFORE THE REPORT
NEEDS TO BE GIVEN.

AS WITH THE MORNING SESSION, THERE IS NO FORMAL AFTERNOON BREAK. PARTICIPANTS SHOULD
BE ENCOURAGED TO TAKE A BREAK AT A CONVENIENT TIME FOR THE GROUP ACTIVITIES.

PART C.  Report on Final Environmental Impact Assessment Review (Group Discussion,
          40 min.)

WHEN THE GROUPS RECONVENE, HAVE EACH OF THEM REPORT ON HOW THE FINAL DOCUMENTS
WERE DIFFERENT FROM THE DRAFTS.

   •   How well were the official comments addressed?

   •   How were the public comments handled?
                                       9-4
        July  1998

-------
Principles of Environmental Impact Assessment Review	Facilitator's Manual

    •  Were new data and analyses included in the final draff?

    •  Did the new data fill the gaps identified in the draft review?

    •  Haw could the reviewer have provided comments that might have had more influence on
       the decision maker?

       Points to make:   - The four case studies were chosen because they have draft and final
                       versions, and because the studies do not reflect the multitude of
                       environmental impact assessments that were so poorly prepared that
                       they never made it to final form
                       - Stress to reviewers not to get discouraged: the environmental impact
                       assessment process provides for incremental, not dramatic, changes. -
                       - Also, it often does not reflect the amount of environmental damage
                       that would have occurred had there been no environmental impact
                       assessment process in the first place.

DURING AND AFTER DISCUSSING THESE ISSUES FOR EACH GROUP, ADD TO THE ADVICE TO
REVIEWERS LIST.

    Once again, we identified a number of things that should have been addressed, but were not,
    in the final document.  Consider the quality of the final documents, the way they responded
    (or did not) to the draft comments, and the manner in which the issues were addressed.

    •  What do you think you could have done to improve the response to your comments?

    •  What would you have liked to do if you had been in a Proactive situation? It is not
       unusual for a reviewer to be involved with project proponents and others during the
       project to develop alternatives and further analysis, and to be engaged in the process
       between the draft and the final environmental impact assessment.

DISCUSS HOW REVIEWS WOULD DIFFER IN THEIR APPROACH. WOULD DIFFERENCES LIE IN THE
CONCLUSIONS REACHED? IN THE LEVEL OF ANALYSIS/DOCUMENTATION POSSIBLE? IN THE TIME
NEEDED FOR REVIEW? IN THE ABILITY TO INFLUENCE THE PROCESS?

    Tomorrow we will begin at 8:30 to discuss development of a Record of Decision and
   Mitigation Plan.

    •   Are there any comments or questions from today before we adjourn?
                                         9-5                                July  1998

-------
Principles of Environmental Impact Assessment Review
Facilitator's Manual
 PART D. Advice to Reviewers (Group Discussion, 5 min.)

    •  Now that you have had an opportunity to review both the draft and final environmental
       impact assessment documents, is there any additional advice to reviewers that you would
       like to include on our list?

 ADD TO "ADVICE TO REVIEWERS" LIST AS APPROPRIATE, OR REEMPHASIZE POINTS ALREADY MADE.

 ALLOW DISCUSSION FOR 2-3 MINUTES.

 CLOSE THE SESSION FOR THE DAY.

    •  Does any one have any questions about the review process we have conducted today?

 Tomorrow we will discuss the next stage of the environmental impact assessment process and
your role as reviewers in the record of decision and the mitigation plan preparation.

 REFER TO THE FLOWCHART.

    Our next session tomorrow morning will cover preparing a Record of Decision and
    mitigation plan. The facilitator for  this session will be [INTRODUCE THE NEXT
    FACILITATOR}, who will lead us through the role of the reviewer in the decision-making
   process and post-decision monitoring and follow-up stages of the environmental impact
    assessment process.
                                        9-6
        July  1998

-------
Principles of Environmental Impact Assessment Review
                     Facilitator's Manual
                 SESSION 10: PREPARATION OF A RECORD OF
                       DECISION AND MITIGATION PLAN
 MATERIALS:
 Flipcharts:   10-1 Road Map for Record of
              Decision Preparation
              10-2 Road Map for Mitigation
              Plan Preparation

 Handouts:    10-1 Road Map for Record of
              Decision Preparation
              10-2 Road Map for Mitigation
              Plan Preparation
              10-3 Instructions for Record of
              Decision and Mitigation Plan
              10-4 Mitigation Follow-Up
              Action Plan

 Other:       Case Studies
              Resource Manual (e.g., 1.6.3)
TIME:     2 hours and 10 minutes
SETTING: Group discussion
           Small group exercise
 TEXT:
 2.4    Decision-Making
 3.4.4  The Role of the Reviewer in Decision-making
 3.4.5  The Role of the Reviewer in Post-Decision Monitoring and Follow-up
 4.6    Mitigation and Monitoring Measures
 PURPOSE:  • To learn how to prepare a Record of Decision
             • To learn how to prepare a Mitigation Plan
             • To practice preparing a Record of Decision and Mitigation Plan
 TIME BREAKDOWN:
 Part A  Record of Decision and Mitigation Plan
        Introduction
 Part B  Approach to Record of Decision and
        Mitigation Plan Preparation
 Part C  Preparing a Record of Decision and
        Mitigation Plan (includes break)
 Part D      Record of Decision and Mitigation
        Plan Report
 Group Discussion

 Group Discussion

 Small Group Exercise

 Group Discussion
10 minutes

10 minutes

80 minutes

30 minutes
                                       10-1
                              July 1998

-------
Principles of Environmental Impact Assessment Review
Facilitator's Manual
Part A.   Record of Decision and Mitigation Plan Introduction (Group Discussion, 10
          min.)

   In this session we will prepare a Record of Decision and Mitigation Plan.  I want to make
   sure we all understand what they are. Let's discuss the Record of Decision.

RECORD OF DECISION

   What is the reviewer's role in decision making?  In some countries,  environmental impact
   assessment reviewers have the authority to decide whether a proposed project is allowed to
   proceed or not.  The reviewer may also have the authority to give conditional approval to a
   proposed project, with the reviewer setting the conditions for approval.

   In other countries, the project proponent, and not the reviewer, prepares the Record of
   Decision.  Indeed, the reviewer may not even have any authority to review or comment on
   . the Record of Decision.

   This session is focused on describing environmental impact assessment processes assuming
   that the reviewer, and not the decision-maker, prepares the Record of Decision. Even if
   you are not responsible as reviewers for preparing Records of Decision, we have included
   this exercise to make you more effective reviewers. Environmental impact assessment is a
   decision-making process, and your role is to support that process. By understanding this
   crucial final step in the decision-making process, your input on all of the previous steps
   will most likely be more constructive and useful.  In other words, your goal throughout the
   review process should be to put the decision-maker in a position to make and document the
   best possible decisions.  In learning about how to prepare a Record of Decision, you will
   learn more about how you can play this crucial supporting role.

   •   What is a Record of Decision?

   The document that contains the reviewers decisions on project approval, denial, or
   conditional approval may have different names in different countries, but we are using the
   term Record of Decision to mean just that.

   The Record of Decision is the final decision on the project by the responsible agency or
   project sponsor and may or may not be open for public comment.  Within the U.S. it is
   possible to obtain one, although it is not required to be disseminated.

   «   How does it differ from the final  environmental impact assessment?
                                         10-2
         July 1998

-------
Principles of Environmental Impact Assessment Review	Facilitator's Manual

   The final environmental impact assessment presents the alternatives and the preferred
   alternatives for the preparer of the environmental impact assessment.  This is not
   necessarily the same individual as the decision maker.  So, a final decision may adopt a
   different alternative or combination of alternatives.

   The point is that there may be changes to the project AFTER the final environmental
   impact assessment:

   •   Does the reviewer as decision maker need to decide upon the environmentally preferred
       alternative?

   For this exercise you are free to decide what to approve in your decision.  You are not
   limited to either the alternative preferred by the project proponent and preparer of the
   environmental impact assessment or the environmentally preferred alternative.  I want to
   briefly mention the differing role played by the environmentally preferred alternative
   depending on country requirements.  Some countries may require implementation of the
   environmentally preferred alternative, while most others, tike the United States, require
   only that the environmental consequences of the action be considered during decision
   making, whether or not the environmentally preferred alternative is selected.  Of course,
   there are a variety of laws in the United States and other countries that ensure that
   environmental damage does not occur, and these laws are actively enforced, but the
   environmental impact assessment process does not require implementation of the
   environmentally preferred alternative.

   •   What should a Record of Decision contain ?

       Possible responses:   - Describe the decision, clearly stating what alternative was
                           selected and the justification for selection
                           - Justify the decision (why it is environmentally
                           acceptable)
                           - Summarize alternatives considered
                           - Set conditions of approval (mitigation and continuing
                           monitoring or other such requirements)
                           - Discuss concurrent regulations/laws and compliance
                           with these
                           - Demonstrate that the environmental impacts of the chosen
                           alternative were fully considered in the decision-making process
                           - Demonstrate that the benefits of the project outweigh the
                           adverse impacts of the proposed project
                           - Demonstrate that the implementation of the proposed project
                           will be as environmentally acceptable as possible.
                                         10-3                                July 1998

-------
Principles of Environmental Impact Assessment Review
Facilitator's Manual
    •  If a reviewer is not the decision maker, can a reviewer request to comment on the
       Record of Decision?

    This is usually discretionary with the reviewer.  The Decision maker may actually welcome
   positive comments on the Record of Decision as support for the proposed project, if they
   have been responsive to previous comments which were negative.

    Comments on the Record of Decision provide closure to the project for the reviewer.

MITIGATION PLAN

   Now let us define what we mean by a Mitigation Plan.

   •   What is a Mitigation Plan ? And why is it important?

   A Mitigation Plan is the documenting of commitments to implement mitigation measures for
   the approved alternative. It may or may not  itself be enforceable.  We discussed many
   aspects of developing proposed mitigation in  Session 7 except that we did not choose which
   mitigation measure to require and we did not ensure that the actions specifically commit
   designated parties to mitigation and follow up monitoring to enforce conditions. Please
   keep that distinction in mind as we move through this session.

   •   Who prepares the Mitigation Plan and who  carries it out?
       In situations where the reviewing agency sets permit conditions for proposed projects,
       the Mitigation Plan provisions would be incorporated as permit conditions.

       Like the Record of Decision,  reviewers are responsible for preparing Mitigation Plans
       in some countries, but not in others.  As with the Record of Decision, we will go
       through this session with the assumption that the reviewer is responsible for preparing
       the Mitigation Plan.

   •   Does a Mitigation Plan ensure mat the chosen alternative is environmentally sound?
       No, apian attempts to ensure harms are minimized.

GO OVER HIERARCHY OF MITIGATION MEASURES (AVOID, MINIMIZE, REDUCE, CORRECT,
   COMPENSATE)
                                        10-4
         July 1998

-------
Principles of Environmental Impact Assessment Review	Facilitator's Manual
   *   What should a Mitigation Plan include?

       Possible Responses:  - Fall back options in case part of the plan is not working
                          - Criteria for success
                          - Assurance of financial commitment
                          - Timetable for completing mitigation steps (in construction,
                          operation, and closure)
                          - Designation of who will enforce the plan and a statement of the
                          legal/regulatory authority to enforce it
                          - Consideration of the consequences of the mitigation measures
                          (e.g., where the scrubber waste will go)
                          - Reflection on the significance of the adverse environmental
                          impacts
                          - An implementation schedule, which should identify the   .
                          committed and financially/legally responsible parties.

   •  Should other agencies or the public be involved in the Mitigation Plan ?

   Public acceptance of the plan should be considered. Other agencies involved should be
   consulted and in some cases drawn in to build on their authorities. A proactive reviewer
   makes every effort to do this.

   •  Should all possible environmental impacts include mitigation measures ?

   Usually a mitigation plan addresses at least the most significant environmental impacts and
   mitigation measures that are relatively easy and straightforward to accomplish.  There may
   even be a fair amount of negotiation with the project sponsor and other involved agencies
   and the public, not in an open ended way but in a systematic and principled way, in order
   to ensure that the mitigation will indeed be realistic and implemented and has the sponsor's
   full commitment.

   •  How can the reviewer assure that the Mitigation Plan is carried out?

   There may be many different ways a reviewer can better assure that the mitigation plan will
   be carried out.  Specific measures that are most important should have some enforceability
   assurance and follow up monitoring.  You can even sometimes insist that the plan be part
   of the contract with construction/operation contractors,  or include a schedule for when
   inspection will take place and specify consequences if commitments are not met.

   •  Does anyone have any questions about the definitions for Mitigation Plan or Record of
      Decision?

                                        10-5                                July 1998

-------
 Principles ofEnyironmental Impact Assessment Review
Facilitator's Manual
 CLARIFY ANY CONFUSION THAT MAY EXIST,

 Part B.   Approach to Record of Decision and Mitigation Plan Preparation (Group
          Discussion, 10 rain.)

   Let's look at the road maps for Record of Decision and Mitigation Plan preparation as a
   summary of many of the ideas you have raised.

 REVEAL FLIPCHARTS # 10-1 "ROAD MAP FOR RECORD OF DECISION" AND #10-2 "ROAD MAP
 FOR MITIGATION PLAN PREPARATION." WALK THROUGH THE FLIPCHARTS, MAKING SURE ALL
 UNDERSTAND THE CONCEPTS. AMEND THE FLIPCHARTS AS NEEDED TO CAPTURE THE IDEAS
 DISCUSSED BY THE GROUP.

 Road Map for Record of Decision Preparation

       *  Re-state the purpose and need

       •  Support preferred alternative and justify that it meets purpose and need

          -  Either preferred environmentally or meets purpose and need better than other
             alternatives

          -  Meets legal requirements

       •  Demonstrate all potentially adverse environmental impacts from the selected
          alternative were fully considered

       •  Demonstrate that benefits of proposed project outweigh adverse impacts

       •  Demonstrate that implementation of the proposed project will be environmentally
          acceptable

       •  Mitigation and continuing responsibilities
Road Map for Mitigation Plan Preparation

      •   Proposes specific mitigation measures for:
          -   All (significant) adverse environmental impacts
          -   All primary, secondary, cumulative adverse environmental impacts
                                       10-6
         July 1998

-------
Principles of Environmental Impact Assessment Review	Facilitator's Manual

          -  All phases of the project
          -  All relevant environment types (natural and human)

       •  Where appropriate, proposes mitigation measures most desirable in hierarchy

       •  Provides sufficient detail relative to the significance of each environmental impact

       •  Includes technically and financially feasible measures
          -  Financial/other resources
          -  Socially and culturally acceptable

       •  Includes implementation plans, schedules and interim milestones, and tuning
          consistent with other factors

       •  Identifies responsible parties committed to implement.

PartC.   Preparing a Record of Decision and Mitigation Plan (Small Group Exercise, 60
          min.)

DISTRIBUTE HANDOUT #10-3.

   Now you are going to convene your small groups to prepare two documents. During  the
   first half-hour, you mil prepare a Record of Decision for the case study environmental
   impact assessment you have been reviewing.  The handout provides the key assumptions
   you are making. The Record of Decision should be no longer than two pages.

   For the second half-hour, you will write a  Mitigation Plan for the alternative you selected
   in your Record of Decision.

DISTRIBUTE HANDOUT #10-4

   / am distributing a format for you to use to record the mitigation plan conditions.

   Unlike previous exercises with the case study documents, in this exercise YOU are the
   decision maker.  As we discussed earlier, in your actual responsibilities you may or may
   not have this role.  However, even if you do not have this role, it is very important to be
   able to put your self in  the position of the decision maker.  Try to imagine the information
   they would need to make a sound decision, and determine what needs to be accomplished
   to effectively communicate the decision.

   For the Record of Decision, you should identify the alternative that will be implemented,
   and write a justification of why you selected that alternative. For the Mitigation Plan, you

                                        _                                 juiy 1998

-------
Principles of Environmental Impact Assessment Review
Facilitator's Manual
   should select appropriate mitigation measures for the alternative you have chosen to
   implement.  You will be doing these two things as a group.  When your group reports its
   conclusions, you mil be asked to clearly identify the alternative you selected, and why, as
   well as the specific mitigation that you recommend to be implemented. Please keep both of
   the Road Maps we just discussed in mind when conducting your reviews and preparing
   your reports.

   It is now	(STATE THE CURRENT TIME).  You will have until	(30 MINUTES
   FROM NOW) to prepare your group Record of Decision.  Then you will have from	
   (30 MINUTES FROM NOW) until	(ONE HOUR FROM NOW) to write your Mitigation
   Plan. There is no formal break scheduled for this morning.  You may take a few minutes at
   your group's convenience during this pan of the session.

   •  Does anyone have any questions? The facilitators will be available throughout this
      exercise to answer any questions you may have.

WHEN THERE ARE ABOUT 10 MINUTES LEFT IN THE RECORD OF DECISION AND MITIGATION
PLAN PARTS OF THE EXERCISE (AT 20 AND 50 MINUTES FROM NOW, RESPECTIVELY), REMIND
GROUPS TO PREPARE THEIR PRESENTATIONS ON THOSE TOPICS.

PartD.      Record of Decision and Mitigation Plan Report (Group Discussion, 30 min.)

WHEN GROUPS RETURN, HAVE EACH GROUP REPORT FOR TWO MINUTES ON ITS RECORD OF
DECISION AND FOR TWO MINUTES ON  THE MITIGATION PLAN THE GROUP DEVELOPED TO
SUPPORT rr. THEN, AFTER ALL PRESENTATIONS HAVE BEEN COMPLETED, LEAD A DISCUSSION
FOR UP TO FIVE MINUTES TOTAL ON WHETHER THE GROUP DECISIONS WERE THE SAME AS
THE DECISIONS ACTUALLY TAKEN IN THE CASE STUDY ENVIRONMENTAL IMPACT ASSESSMENTS,
AND IF THEY DIFFERED, HOW THEY DIFFERED AND WHY.

ADD TO THE "ADVICE TO REVIEWERS" AS APPROPRIATE DURING THE DISCUSSION.

   •  Does anyone have any other advice to reviewers that we have not already captured?

RECORD RESPONSES ON THE BLANK FUPCHART .

   •  After having reviewed all the sections of the draft and final environmental impact
      assessments, do you feel you were able to effectively prepare the Record of Decision
      and Mitigation Plan ?  Would your approach to writing these documents have been
      different if you had been [name for Proactive]?  If you were [name for Empowered]? Is
      there a need for a team prepare either of these documents? What would have you done
      differently if you had been [name for Lead]?
                                      10-8
         July 1998

-------
Principles of Environmental Impact Assessment Review	Facilitator's Manual

FACILITATE A DISCUSSION ON THESE QUESTIONS FOR A FEW MINUTES. REFER TO THE
ENVIRONMENTAL IMPACT ASSESSMENT FLOWCHART. SHOW YOU HAVE COMPLETED THE FULL
PROCESS.

   We have now finished with the review of our case study environmental impact assessment
   documents and we have completed the entire environmental impact assessment process from
   project initiation to decision, implementation and monitoring. Some additional reference
   material is available for your use in the Resource Manual:  Section 1.7.1 - Negotiating a
   Monitoring Program and Section 3.2 - Project Specific Mitigation Measures World Bank
   Tables.

   Are you more the empowered reviewer than just solo?  Just to make sure, in our next
   session will present some information on resources available to help you conduct reviews.
   This afternoon, we will talk about environmental impact assessment review in [name of tins
   country].

   Before we take a break, let's review some of the key concepts we discussed during the
   course.

OPTIONAL: LEAD THE PARTICIPANTS IN A DISCUSSION HIGHLIGHTING THE KEY CONCEPTS FROM
THE BEGINNING OF THE COURSE, SUCH AS:

   •  THE INSERTION OF THE ENVIRONMENTAL IMPACT ASSESSMENT PROCESS IN WHAT
      WOULD OTHERWISE BE DIRECT IMPLEMENTATION OF PROJECT IDEAS. AND SPECIFICALLY
      WHERE DRAFT AND FINAL DOCUMENT DEVELOPMENT ARE CONDUCTED AND WHERE
      PUBLIC PARTICIPATION IS THE GREATEST

   •  THE VARIETY OF CONTEXTS AND SITUATIONS A REVIEWER MAY BE IN, WHAT
      INFLUENCES THOSE SITUATIONS, AND HOW THE REVIEWS MAY DIFFER

   •  THE CONTEXT OF THE REVIEW: LEGAL, INSTITUTIONAL, ORGANIZATIONAL, AND
      PERSONAL AND WHAT AFFECT FT HAS ON THE REVIEW PROCESS

   •  THE FOCUS OF A REVIEWER NO MATTER WHAT THE CONTEXT: COMPLETENESS,
      SIGNIFICANCE, ADEQUACY, INTEGRITY, ACCURACY, AND INFLUENCE

   •  THE REVIEW PROCESS ITSELF AND THE FUNDAMENTAL ROAD MAP TO ASSIST ANY
      REVIEWER, WITH ANY BACKGROUND, IN ANY SITUATION THROUGH A THOUGHTFUL AND
      SYSTEMATIC REVIEW OF AN ENVIRONMENTAL IMPACT ASSESSMENT DOCUMENT.

   •  THE TOOLS AND TECHNIQUES AVAILABLE TO A REVIEWER - WHICH WE WILL EXPAND
      UPON IN THE NEXT SESSION.

                                     —                             jui 1998

-------
Principles of Environmental Impact Assessment Review
Facilitator's Manual
AT THE END OF THE SESSION, ASK THE PARTICIPANTS TO RETURN THE DRAFT ENVIRONMENTAL
IMPACT ASSESSMENT DOCUMENTS FOR USE IN FUTURE COURSES. INFORM THEM THAT THEY
MAY KEEP THE FINAL ENVIRONMENTAL IMPACT ASSESSMENT DOCUMENTS FOR THEIR OWN
LIBRARIES.
                                    10-10
        July 1998

-------
Principles of Environmental Impact Assessment Review
                                                      Facilitator's Manual
                   SESSION 11: RESOURCES FOR A REVIEWER
 MATERIALS:
 Hip Charts:  11-1 Resources for a Reviewer

 Handouts:   None
                                   TIME:    1 hour 35 minutes
                                SETTING:   Large Group
 Other:       Environmental Assessment Case Study and the Environmental Assessment
              Resource Guide on Compact Disc

              Resources for a Reviewer Video Demonstrating Use of the Case Study and
              Resource Guide
 TEXT:
Not Applicable
 PURPOSE:  •  To familiarize participants with software developed to guide users through
                 the process of preparing environmental impact assessment documents
              •  To introduce participants to materials in the course Resource Manual that
                 have not been covered in the course
 TIME BREAKDOWN:
 Part A    Review of the Student Text
 Part B    Review of Principles of Environmental Impact
           Assessment Review Resource Manual
 Part C    Review of the Compact Disc Programs
           and Use
 Part D    Demonstration of the Compact Disc Programs
 Part E    Discussion of the Compact Disc Programs and
           Other Resources
                                      Group Discussion

                                      Group Discussion

                                      Group Discussion
                                      Group Discussion
2 minutes

3 minutes

5 minutes
60 minutes
                                      Group Discussion    25 minutes
REVEAL FLIPCHART #1 l-l (RESOURCES FOR THE REVIEWER)

   Up to this point, you 've only had a limited opportunity to work with and become familiar
   with the course materials at hand.

HOLD UP: STUDENT TEXTS, RESOURCE MANUAL AND COMPACT DISC.

   This session will provide an overview of these materials.  We refer to these materials as
   "resources. "  Together, they'II form the basis of a "Resource Library" of materials
   available to assist you in conducting environmental impact assessment reviews. We will
   review the specific contents of each of these resources.  They are designed for easy use.
                                        11-1
                                                            July 1998

-------
Principles of Environmental Impact Assessment Review
Facilitator's Manual
   Their contents are organized to compliment one another.  By the end of this session, you
   should no longer feel intimidated by these documents.

Part A    Review of the Student Text (Group Discussion 2 minutes)

   Let's begin with a close look at the first resource, the Student Text for the "Principles of
   Environmental Impact Assessment Review" course. The Student Text is intended to serve
   as both a stand-alone document and as a supplement to the course.  You have already
   referred to the Student Text for "Principles of Environmental Impact Assessment Review " in
   previous sessions. I -will now give an overview of the chapters in the "Principles of
   Environmental Impact Assessment Review" Student Text.  I will also identify the specific
   sections of the "Principles of the Environmental Impact Assessment" Student Text and the
   Resource Manual for "Principles of Environmental Impact Assessment Review" that are
   associated with each Chapter of the Student Text for this course.

   Chapter 1 provides an introduction to the content of the Student Text, its purpose and how it
   is to be used.

   Chapter 2 gives an overview of the environmental impact assessment process. It defines the
   environmental impact assessment process, explains the role of public participation and when
   to include it in the process, preparation of draft and final environmental impact assessments
   and post-decision monitoring and follow-up assurances.  (COMPLIMENT: PRINCIPLES OF
   ENVIRONMENTAL IMPACT ASSESSMENT STUDENT TEXT. THIS is THE MAIN REFERENCE FOR
   MORE DETAIL ON THE ENVIRONMENTAL IMPACT ASSESSMENT PROCESS; IN ADDITION, THE
   RESOURCE MANUAL FOR THE PRINCIPLES OF ENVIRONMENTAL IMPACT ASSESSMENT REVIEW,
   SECTION 1)

   Chapter 3 explores the role of the reviewer with respect to each component of the
   environmental impact assessment process. This includes the types of review situations,
   approaches for a successful review, communicating the findings of the review and
   overcoming obstacles to successful environmental impact assessment review.

   Chapter 4 takes you through each step of reviewing an environmental impact assessment
   from analyzing each element of the environmental impact assessment through mitigation and
   monitoring measures. A more detailed list of the kinds of information useful in an
   environmental impact assessment review can be found here. Also included are in-depth
   discussions of primary, secondary and cumulative impacts as well as numerous assessment
   tools and techniques for environmental impact assessment review (e.g., economic tools,
   checklists, matrices, weighing techniques, GIS, transport models, and road map guides)
                                        11-2
       July 1998

-------
Principles of Environmental Impact Assessment Review	Facilitator's Manual

   (COMPLIMENT: RESOURCE MANUAL FOR THE PRINCIPLES OF ENVIRONMENTAL IMPACT
   ASSESSMENT REVIEW, SECTION 2)
   The Appendices contain methodologies, checklists, definitions, and guides for assessing the
   adequacy of the information in an environmental impact assessment used to describe the
   environmental setting and assess the environmental impacts. Appendix A: Environmental
   Impact Assessment Evaluation Checklist; Appendix B: Environmental Impact Assessment
   Methodologies; Appendix C: Impact Term Definitions, Identifying Significant Issues -
   Examples Appendix D:  Contents of Specific Environmental Impact Assessment Tools; and
   Appendix E: Road Maps and Tools and Techniques (COMPLIMENT: RESOURCE MANUAL FOR
   THE PRINCIPLES OF ENVIRONMENTAL IMPACT ASSESSMENT REVIEW, SECTION 2 AND SECTION
   6)

Part B.  Review of Principles of Environmental Impact Assessment Review Resource
         Manual (Group Discussion 3 minutes)

   Now, lets take a look at a second resource, the Resource Manual: "Resource Manual for
   the Principles of Environmental Impact Assessment Review."  The manual's genesis was a
   precursor document entitled "Sourcebookfor the Environmental Assessment (EA) Process,"
   September 1993.  The "Sourcebook" was an effort to provide, for the first time, a one-stop
   reference to meet the demand for information on the environmental assessment process.  It
   was used as an adjunct to the  "Principles of Environmental Impact Assessment" training
   course. However, time, experience gained from delivery of the Principles Environmental
   Impact Assessment course and the development of the "Principles of Environmental Impact
   Assessment Review" course led to the evolution of the "Sourcebook" into the "Resource
   Manual for the Principles of Environmental Impact Assessment Review ".

   You used a portion of the Resource Manual (Section 1) in a previous session.  You may
   recall this section describes the major activities that fashion a comprehensive environmental
   impact assessment such as project initiation, scoping, assessment, decision-making, and
   post-decision analysis. (COMPLIMENT: PRINCIPLES ENVIRONMENTAL IMPACT ASSESSMENT
   REVIEW - STUDENT TEXT, CHAPTER 2)

   I will now give an overview of the other six sections of the manual that can assist you in
   finding information we may not have covered during the course. I will also identify specific
   sections of the Student Text that are associated with the Resource Manual.

   Section 2 contains the same matrix of environmental impact assessment methodologies
   useful for understanding the different methods that may be used in an environmental impact
   assessment review that is in  the Principles of Environmental Impact Assessment Review
   Student Text. The matrix displays various tools and techniques that can be used to obtain
                                        11-3                                July  1998

-------
 Principles of Environmental Impact Assessment Review
Facilitator's Manual
    information that you would need to successfully complete a review (transport models,
    checklists, overlay mapping, matrices, and scaling techniques).  This section also contains an
    example checklist for environmental impact assessment review, (COMPLIMENT: PRINCIPLES
    ENVIRONMENTAL IMPACT ASSESSMENT REVIEW - STUDENT TEXT, APPENDIX A AND APPENDIX
    B)

    Section 3 contains a list of speci/lc characteristics from various types of industrial
    discharges and a World Bank Table of project specific mitigation measures. (COMPLIMENT:
    PRINCIPLES OF ENVIRONMENTAL IMPACT ASSESSMENT REVIEW - STUDENT TEXT, APPENDIX
    C-l)

    Section 4 contains an assemblage of U.S. environmental impact assessment laws and
    regulations. It also serves as a place-holder for incorporation of country-specific laws and
    other relevant information. This section is designed to change with each delivery of the
    course to reflect the laws of the host country.

    Section 5 includes: 1) a list of relevant environmental impact assessment guidance
    developed by the U.S. Environmental Protection Agency; and 2) example guidance on the
    evaluation of ecological impacts from a highway development project and environmental
    impacts from mining operations. Host countries may provide additional guidance that is
    appropriate to their environmental impact assessment process.

    Section 6 contains: 1) a glossary of terms; 2) a list of non-governmental associations and
    affiliations that can provide useful information; and 3) Internet sites (COMPLIMENT:
    PRINCIPLES OF ENVIRONMENTAL ASSESSMENT REVIEW - STUDENT TEXT, APPENDIX C-l)

    Section 7 describes the compact disc programs that were briefly mentioned during this
    session.

Part C    Review of the Compact Disc programs and Use (Group Discussion 5 minutes)

HOLD UP COMPACT Disc ENTITLED "ENVIRONMENTAL ASSESSMENT CASE STUDY."

    This compact disc is a third resource.  It contains two programs that describe and reinforce
   principles of environmental impact assessment.  Both programs were developed by U.S. EPA
    Region 5 with Purdue University in cooperation with the USEPA Office of Federal Activities
    (OFA).  Upon request, additional copies of the program can be provided free of charge to
    government officials and non-governmental organizations.
                                         11-4
       July  1998

-------
Principles of Environmental Impact Assessment Review                          Facilitator's Manual

    The first program is a color, tutorial on the preparation of Environmental impact
    assessments titled "Environmental Assessment Resource Guide." This compact disc-based
    version of the resource manual is based on the U.S. EPA Sourcebook, the World Bank
    Environmental Impact Assessment Sourcebook, and EPA's student text on Principles of
    Environmental Impact Assessment.  The program gives a breakdown of the needs, tools,
    issues, linkages and references for each major section of an environmental impact
    assessment. The program contains a complete glossary, utilities such as a list of government
    agency acronyms, and checklists to help you determine the kinds of information needed for
    each component of the environmental impact assessment.

    The second program is an "interactive "program that will lead you through the steps to
    complete an Environmental impact assessment. This program is particularly useful if you
    care involved in project planning and management aspects of an Environmental impact
    assessment.  This program is based on an actual project, the Diamond Chuitna Coal Project
    in Alaska, reviewed by U.S. EPA Region JO, in the 1980's.  The materials are dedicated to
    mining issues but the principles of environmental impact assessment demonstrated by the
    program are applicable to the review of other types of proposed projects.

    The compact disc enables you to review the project and look at the affected geographic area
    through interactive maps and three-dimensional simulated fly-overs. It provides a
    perspective not attainable in a written document. Also included are video clips of mock
    reports about the mining project.  A series of interactive questions is utilized to guide you
    through the environmental impact assessment decision process. At various points throughout
    the program, you will be given the opportunity to test your knowledge of this particular
    mining case study with a short quiz.  Instantaneous feedback is provided by a list of the
    possible responses to the questions, in addition to a description of the actual events that
    occurred during the Diamond Chuitna Coal Project.

    Perhaps the most important aspect of the interactive program is the built-in notebook
   feature. By saving the notebook, you are able to store your ideas and answers to questions
   for future reference.  The notebook may also be used as a generic tool kit for preparing
    environmental impact assessments and a guide when reviewing the different sections of an
    environmental impact assessment document.

Part D   Demonstration of the Compact Disc programs (Group Discussion, 60 minutes)

AT THIS POINT, YOU WILL HAVE TWO OPTIONS. OPTION 1: SHOW THE PARTICIPANTS A
VIDEOTAPE DEMONSTRATION OF THE COMPACT DISC GIVEN BY ALFRED KRAUSE OF USEPA
REGION 5 OR OPTION 2: DEMONSTRATE THE COMPACT DISC YOURSELF.
                                         11-5                                July  1998

-------
Princioles of Environmental Impact Assessment Review
Facilitator's Manual
OPTION1: Introduction of the Videotape Compact Disc Demonstration (Group Activity
60 minutes)

THE PARTICIPANTS WILL BE ABLE TO FOLLOW ON AN OVERHEAD PROJECTION SCREEN AS MR.
KRAUSE NAVIGATES THROUGH THE PROGRAM.

THE TELEVISION AND VIDEO CASSETTE RECORDER SHOULD BE SET UP BEFORE THE PARTICIPANTS
RETURN FROM THEIR BREAK.  COMPLETE A QUICK POWER CHECK BEFORE YOU BEGIN. MAKE SURE
THAT YOU ARE ABLE TO LOCATE THE CONTROLS READILY.

   In a few moments, we will watch a video that demonstrates how to install and use the
   compact Disc programs.  The speaker in the video is Mr. Alfred Krause of USEPA Region 5.
   He prepared the demonstration so that the viewer may follow along on an overhead
   projection screen as he works through the program from his computer. The video provides
   you with the basic instructions needed to navigate through the programs.

   While watching the video, feel free to jot dawn questions and comments about the use of the
   software that you would like to have clarified We will have about JO minutes at the end of
   the video to discuss the programs.

IF NECESSARY, HAVE ANOTHER FACILITATOR ADJUST THE LIGHTS, THEN START THE VIDEO.  ASK
THE PARTICIPANTS IF THEY ARE ABLE TO SEE AND HEAR THE VIDEO CLEARLY. MAKE ANY
NECESSARY ADJUSTMENTS.

AT THE END OF THE VIDEO PRESENTATION, PREPARE TO TAKE QUESTIONS ABOUT THE VIDEO
PRESENTATION.

OPTION 2: Demonstration  of the Compact Disc-based Programs (Group Activity 60
minutes)

YOU SHOULD REVIEW THE VIDEOTAPE DEMONSTRATION AND THE CONTENTS OF THE COMPACT
DISC PRIOR TO PRESENTING THIS OPTION. MAKE A NOTE OF THE COMPUTER SYSTEM
REQUIREMENTS FOR USING THE COMPACT DISC BEFORE YOU SELECT THE COMPUTER SYSTEM(S)
THAT WILL BE USED DURING THE SESSION.  BOTH PROGRAMS ON THE COMPACT
DISC(UEJWIRONMENTAL ASSESSMENTRESOURCE GUIDE" AND "DIAMOND CH1VTNA CASE
STUDY") ARE ACCOMPANIED BY TEXT FILES NAMED "READ ME". THESE FILES PROVIDE SPECIFIC
INFORMATION ABOUT SYSTEM REQUIREMENTS AND INSTALLATION INSTRUCTIONS. DURING YOUR
PRESENTATION,  REMEMBER TO CALL THESE FILES TO THE PARTICIPANT'S ATTENTION.

   / would like to take the next thirty minutes to show you how to use these programs. We will
   not have time to go through the contents of both programs in detail, but by the end of this
                                       11-6
       July 1998

-------
Principles of Environmental Impact Assessment Review	Facilitator's Manual

   presentation, you mil have an idea of the kind of information that you 'II find when you use
   the programs on your own.  Keep in mind, the Resource Manual for the Principles of
   Environmental Impact Assessment Review and compact disc-based programs compliment
   one another.  You may be able to find information in the Resource Manual that the software
   developers could not present on one compact disc,
Part E    Discussion of the Compact Disc Programs and Other Resources (Group
          Discussion 25 minutes)

   •  Before we begin discussing the specific details of the programs, I would like to find out
      how many of you believe that this program would be a tool that would benefit you as a
      reviewer of Environmental impact assessments?  Why?

      Possible Responses:   Shows a systematic approach to an environmental impact
                           assessment review

                        j  Offers suggestions/ideas for conducting an environmental impact
                           assessment review

   •  How might this program benefit the reviewer?

      Possible responses:    - Saves time in review
                           - Displays relevant information in one place
                           - Easy to access information

   •  Does anyone feel that this may not be an adequate tool for a person in the role of
      reviewer?  Why?

      Possible responses:    - Irrelevant if equipment not available to use
                           - Time constraints may inhibit use
   Some final thoughts.  The case studies you have been working with can also be a resource.
   Recall how you applied "Sources of Environmental Data" in Section 1 of the Resource
   Manual during the group exercise in Session 5, Review of the Description of the
   Environmental Setting. Section 1 was formatted to enable you to record a list of information
   sources of environmental data that are unique to your needs.

   Keep in mind also that fellow course participants, co-workers, colleagues and even
   management can be important resources for you.  At different times, you may need
   individuals you can work closely with during the entire review of the document or you may
   only need the technical expertise of another for a specific part of the environmental impact
                                         11-7                                July 1998

-------
Principles of Environmental Impact Assessment Review
Facilitator's Manual
   assessment review. That is why it is important to develop a network of contacts whom you
   can ask for help, officially and unofficially, during your review.

   This course allows you to meet others with various expertise and experience in environmental
   impact assessment reviews.

   It is now [INDICATE THE TIME]. We -will break for a one hour lunch.  After lunch, -we will
   discuss and elaborate further on Chapter Four of the Resource Manual, "Country Specific
   Laws/Background."
                                         11-8
       July  1998

-------
 Principles of Environmental Impact Assessment Review
Facilitator's Manual
               SESSION 12: COUNTRY-SPECIFIC APPLICATIONS
MATERIALS: TIME: 3 hours
Flip charts: 12-1 Country-Specific Contexts SETTING: Group discussion
Handouts: To be determined by facilitator
Other: To be determined by facilitator


TEXT: Not applicable
PURPOSE: • To describe the legal, institutional, organizational, and personal
for review in the host country.
TIME BREAKDOWN:
Part A Country-specific Context (includes break) Group Discussion 3
contexts
hours
PART A    Country-specific Context (Group Discussion, 3 hours with a 30-minute break
           at the facilitator's discretion)

NOTE TO FACILITATOR: WE ADVISE THAT A LOCAL OFFICIAL MAKE A PRESENTATION.
SIGNIFICANT PARTICIPANT INVOLVEMENT MAY NOT OCCUR UNTIL ONE AND A HALF HOURS INTO
THE DISCUSSION, WHEN YOU DISCUSS THE ORGANIZATIONAL AND PERSONAL CONTEXTS FOR
REVIEW. DURING WHICH, AT THE REQUEST OF COUNTRY OFFICIALS, YOU MAY BE ASKED TO
SERVE A FACBLITATING ROLE...,OR RECORDER ROLE. PRIOR TO DELIVERY OF THIS SESSION,
YOU SHOULD PREPARE FOR THE FIRST TWO PARTS OF THIS SESSION, BASED ON THE
INSTRUCTIONS AND INFORMATION PRESENTED BELOW. BE AWARE OF THE TIME LIMITS
ASSIGNED FOR EACH PART OF THE SESSION.  TIME LIMITS RECOMMENDED FOR EACH PART OF
THIS SESSION ARE AS FOLLOWS:

    •  LEGAL CONTEXT: 1 HOUR

   •  INSTITUTIONAL CONTEXT: 30 MINUTES

   •  ORGANIZATIONAL CONTEXT: 30 MINUTES

   •  PERSONAL CONTEXT: 30 MINUTES.

WHEN PRESENTING COUNTRY-SPECIFIC CONTEXTUAL INFORMATION, IT is OFTEN TEMPTING TO
FOCUS EXCLUSIVELY ON THE LEGAL CONTEXT (E.G., LAWS, REGULATIONS, SPECIFIC
AUTHORITIES). TO ENSURE EFFECTIVE FACILITATION OF THE FULL CONTEXT OF PRINCIPLES
THIS COURSE IS STRUCTURED UPON, YOU ARE ADVISED TO PROVIDE ADEQUATE DISCUSSION ON
                                    12-1
        July 1998

-------
Principles of Environmental Impact Assessment Review
Facilitator's Manual
THE IMPORTANT INSTITUTIONAL, ORGANIZATIONAL, AND PERSONAL CONTEXTS OF REVIEW IN
THE HOST COUNTRY,

IF DESIRED, YOU MAY PREPARE FLIP CHARTS AND HAND OUTS CONTAINING OUTLINES OF THE
INFORMATION YOU WILL PRESENT AND REVEAL/DISTRIBUTE THEM DURING THE SESSION.

    We have spent almost four days now learning about how to be an effective reviewer of an
    environmental impact assessment. During that time, the principles we have learned have,
   for the most part, been principles that would apply equally in any country. In this session,
    we are going to talk about the various contexts for review in this country. As in Session 2,
    we will discuss the legal, institutional, organizational, and personal contexts that
    reviewers must incorporate into the environmental impact assessment review process in
    (NAME OF HOST COUNTRY).  Let's also refer back to the context information you identified
    as being important when we defined the context for review on the first day.

REVEAL FLIP CHART # 12-1 (COUNTRY-SPECIFIC CONTEXTS)

    Legal Context

   Let us first discuss the legal context that reviewers of environmental impact assessments
    must understand in this country.

DISCUSS THE LEGAL CONTEXT IN THE HOST COUNTRY FOR ONE HOUR. DURING THAT TIME,
YOU SHOULD ORGANIZE YOUR DISCUSSION TO ACHIEVE THE FOLLOWING:

    •  ACQUAINT THE PARTICIPANTS WITH THE LOCATION AND CONTENTS OF COUNTRY-
      SPECIFIC DOCUMENTS THAT HAVE BEEN ADDED TO THE RESOURCE MANUAL THAT ARE
      RELATED TO THE LEGAL CONTEXT IN THE HOST COUNTRY.  FOCUS ON EXPLAINING HOW
      TO USE THOSE DOCUMENTS, RATHER THAN REITERATING THEIR FULL CONTENTS.

   •  DISCUSS THE FOLLOWING TYPES OF CONTEXTUAL INFORMATION. AGAIN, PROVIDE AN
      OVERVIEW AND GUIDANCE ON WHERE TO FIND FURTHER INFORMATION RATHER THAN
      ATTEMPT TO FULLY FAMILIARIZE PARTICIPANTS WITH ALL APPLICABLE LAWS AND
      REGULATIONS:

           LAWS AND REGULATIONS APPLICABLE TO THE ENVIRONMENTAL IMPACT
           ASSESSMENT PROCESS

           WHEN ENVIRONMENTAL IMPACT ASSESSMENTS NEED TO BE PREPARED

           WHO NEEDS TO PREPARE THEM
                                      12-2
         July 1998

-------
Principles of Environmental Impact Assessment Review	Facilitator's Manual

           WHAT NEEDS TO BE INCLUDED IN AN ENVIRONMENTAL IMPACT ASSESSMENT
           DOCUMENT (WHAT IS LEGALLY REQUIRED, WHAT IS TRADITIONALLY INCLUDED)?

           WHETHER PUBLIC PARTICIPATION is REQUIRED OR OPTIONAL

           WHAT is THE REQUIRED PROCESS FOR ENVIRONMENTAL IMPACT ASSESSMENT
           DEVELOPMENT

           WHETHER THERE ARE REQUIREMENTS FOR IDENTIFYING ALTERNATIVES

           THE LEGAL STATUS OF THE "PREFERRED" OR "ENVIRONMENTALLY PREFERRED"
           ALTERNATIVE

           LEGAL ABILITY TO IMPOSE MITIGATION AND WHO HAS THIS AUTHORITY

           WHO HAS RESPONSIBILITY TO MAKE DECISIONS

           WHETHER THE DECISION MUST BE LINKED TO THE ENVIRONMENTAL IMPACT
           ASSESSMENT

    •  PAUSE AT LEAST ONCE EVERY TEN MINUTES TO ASK IF THERE ARE ANY QUESTIONS OR
      COMMENTS.

NOTE: THERE SHOULD BE A 15 MINUTE BREAK AT THE END OF THIS PART OF THE SESSION,
BEFORE DISCUSSING THE INSTITUTIONAL CONTEXT.

    Institutional Context

    Welcome back from the break.  We spent an hour discussing the legal context of
    environmental impact assessment review in this country. During the rest of this session,
    we will discuss three other review contexts: institutional, organizational, and personal.
    We will devote less time to each of these discussions, approximately half an hour each,
    than we did for the legal context discussion.

DISCUSS THE INSTITUTIONAL CONTEXT IN THE HOST COUNTRY FOR HALF AN HOUR.  DURING
THAT TIME, YOU SHOULD ORGANIZE YOUR DISCUSSION TO ACHIEVE THE FOLLOWING:

    •  ACQUAINT THE PARTICIPANTS WITH THE LOCATION AND CONTENTS OF COUNTRY-
      SPECIFIC DOCUMENTS IN THE RESOURCE MANUAL (IF ANY) THAT ARE RELATED TO THE
      INSTITUTIONAL CONTEXT IN THE HOST COUNTRY.  FOCUS ON EXPLAINING HOW TO USE
      THOSE DOCUMENTS, RATHER THAN REITERATING THEIR FULL CONTENTS.
                                     12-3                             July 1998

-------
 Principles of Environmental Impact Assessment Review
Facilitator's Manual
    •  DISCUSS THE FOLLOWING TYPES OF CONTEXTUAL INFORMATION, AS WELL AS ANY
       OTHER INFORMATION YOU DEEM APPROPRIATE:

           WHAT INSTITUTIONS ARE INVOLVED, EITHER DIRECTLY OR INDIRECTLY, IN
           ENVIRONMENTAL IMPACT ASSESSMENT PREPARATION AND/OR REVIEW?

           WHAT AUTHORITIES DO THESE INSTITUTIONS HAVE?

           WHAT KIND OF EXPERTISE EXISTS WITHIN AND OUTSIDE OF GOVERNMENT?

           WHAT ARE THE CHARACTERISTICS OF TYPICAL PROJECT PROPONENTS'
           INSTITUTIONS?

           WHAT ARE THE CHARACTERISTICS OF TYPICAL DECISION-MAKERS' INSTITUTIONS?

           MUST A PARTICULAR AGENCY APPROVE ENVIRONMENTAL IMPACT ASSESSMENTS?

           WHICH INSTITUTIONS ARE TYPICALLY AFFECTED BY THE OUTCOMES OF
           ENVIRONMENTAL IMPACT ASSESSMENTS?

           WHAT MECHANISMS EXIST FOR CONFLICT RESOLUTION AMONG GOVERNMENT
           AGENCIES, BETWEEN GOVERNMENT AND THE PRIVATE SECTOR, AND WITH THE
           PUBLIC

    •   PAUSE AT LEAST ONCE EVERY TEN MINUTES TO ASK IF THERE ARE ANY QUESTIONS OR
       COMMENTS.

    Organizational Context

    Now I would like to discuss the organizational context for environmental impact
    assessment review in this country. During this and the next part of this session, I will be
    speaking a lot less and asking you for your input a lot more.  The organizational context is
    similar to the institutional context, except that here we are focusing on specific
    characteristics of the individual organizations that you work in. As we go through this
    discussion for the next thirty minutes, I will be asking some of you to describe the specific
    organizational contexts you work in.

DISCUSS THE ORGANIZATIONAL CONTEXT AT VARIOUS PARTICIPANT ORGANIZATIONS FOR HALF
AN HOUR. DURING THAT TIME, YOU SHOULD ORGANIZE YOUR DISCUSSION TO ACHIEVE THE
FOLLOWING:
                                     12-4
        July 1998

-------
Principles of Environmental Impact Assessment Review	Facilitator's Manual

   •  PROMPT PARTICIPANTS TO DISCUSS THE FOLLOWING TYPES OF CONTEXTUAL
      INFORMATION:

          THE ROLE THE REVIEWER'S ORGANIZATION HAS IN ENVIRONMENTAL IMPACT
          ASSESSMENT DEVELOPMENT

          THE LIMITS TO THE REVIEWING ORGANIZATION'S AUTHORITY

          THE LINES OF AUTHORITY WITHIN THE REVIEWER'S ORGANIZATION

          THE EXPECTATIONS OF SUPERVISORS OF REVIEWERS.

          HOW ARE RESOURCES BUDGETED

          HOW FORMAL ARE RELATIONSHIPS WITH ASSOCIATE REVIEWERS AND HOW IS
          ASSISTANCE AND TECHNICAL EXPERTISE OBTAINED

   PERSONAL CONTEXT

   Now we are going to take our discussion of contexts down to the smallest unit in the
   environmental impact assessment process: you, the reviewer. We are going to discuss
   your personal context for review.  We will only be discussing the personal context for
   thirty minutes, so it will not be possible to discuss everyone's personal context.  I will
   randomly select participants to ask questions of until we run out of time.

   FACILITATE A DISCUSSION ON THE PERSONAL CONTEXT FOR ENVIRONMENTAL IMPACT
   ASSESSMENT REVIEW. STRUCTURE THE DISCUSSION TO ELICIT INFORMATION ON THESE AND
   OTHER KEY POINTS!

          WHAT ARE YOUR PERSONAL STRENGTHS AND WEAKNESSES AS A REVIEWER?

          WHAT RESOURCES ARE AVAILABLE TO YOU IN YOUR ORGANIZATION?

          WHAT RESOURCES MIGHT BE AVAILABLE TO YOU THROUGH OTHER
          ORGANIZATIONS?

          WHAT RESOURCES DO YOU NEED THAT YOU FEEL ARE NOT AVAILABLE TO YOU?

     -    WHAT KIND OF DEADLINES DO YOU TYPICALLY HAVE FOR COMPLETION OF
          REVIEWS?

          WHO CAN YOU CONTACT FOR ASSISTANCE OR INFORMATION?

                                     12-5                            July 1998

-------
Principles of Environmental Impact Assessment Review
Facilitator's Manual
    Great, I think this was a very useful discussion.  I hope you feel better acquainted with the
    various contexts for review that are applicable to your situations.  I know I learned a lot
    about your organizational and personal contexts as they apply to the review of
    environmental impact assessments.

    [NAME OF 'NEXT FACILITATOR] mil lead us through our next session, the course
    evaluation and wrap up of Day 4.  The course evaluation will allow you an opportunity to
    give us feedback on the course and its presentation.  During the wrap up, we can go over
    any remaining questions that you may have.

ANNOUNCE THE STARTING TIME FOR THE FINAL WRAP UP AND COURSE EVALUATION SESSION
AND ANY OTHER NECESSARY LOGISTICAL ARRANGEMENTS OR COMMENTS.
                                       12-6
         July 1998

-------
Principles of Environmental Impact Assessment Review
Facilitator's Manual
                  FINAL WRAP UP AND COURSE EVALUATION
MATERIALS: TIME: 30 minutes
Flip charts: None SETTING: Facilitator presentation
Individual exercise
Handouts: 1-3 Evaluation Form (extra copies if needed)
Other: Certificate of Completion
TEXT: Not applicable.
PURPOSE: • To provide the opportunity for participants to evaluate
• To wrap-up the Day 4 discussion
TIME BREAKDOWN:
Part A Day 4 Wrap-up Facilitator Presentation
Part B Course Evaluation Individual Exercise
the course
10 minutes
20 minutes
PART A    Day 4 Wrap-up (Facilitator Presentation, 10 min.)

       We have now come to the final session in the course. The primary reason for this
       session is to give you an opportunity to tell us how we did as facilitators, and to
       critique the course so we can make it better next time.

       Before we begin the course evaluation, however,  there are a couple of things I want to
       show you. Please turn to the beginning of your Student Text. Included in the document
       is a "Dedication to Reviewers ".

(OPTIONAL) YOU MAY CHOSE TO READ THE DEDICATION TO THE COURSE PARTICIPANTS.
    The Dedication to Reviewers is a good summary of what you do and what you should
    strive for as a reviewer of environmental impact assessment documents and as a
    participant in the environmental impact assessment process.

    You all came into this course with some degree of experience and aptitude in
    environmental impact assessment review, and you are all leaving with enhanced abilities
    and understanding of your role as reviewers.  This dedication was written to remind you of
    vwfta/ we reviewed and discussed over the last four days. I hope you will commit yourself
    to following this dedication every time your participate in an environmental impact
    assessment review process.
                                        13-1
        July 1998

-------
Principles of Environmental Impact Assessment Review
Facilitator's Manual
    / also want to take this opportunity to give you something else to remind you of this
    course.  The facilitators of this course, including myself, want to thank you for
    participating.  I enjoyed myself and learned a lot, and I hope you did as well. By
    successfully completing this course, you have improved your skills at environmental impact
    assessment review. This is an accomplishment you can be proud of.  To recognize this
    accomplishment, I want each of you to have a Certificate of Completion.

DISTRIBUTE CERTIFICATES OF COMPLETION.

PART B    Course Evaluation (Individual Exercise, 20 min.)

    The facilitated part of this course has come to an end, but there is one last thing I would
    like to ask of you. I would like you to assist us in conducting a different kind of review —
    an evaluation of this course.  The only reason this course exists is to help you and others
    like you become more effective reviewers of environmental impact assessments.  We have
    presented many ideas and large amounts of information in this course in an attempt to
    achieve that goal. So please be candid and direct in telling us how we did.  This is your
    course.  We want to hear if it met your needs.

LEAD A DISCUSSION ON THE PARTICIPANTS EVALUATION OF THE COURSE, IN PARTICULAR FOCUS
ON THE FOLLOWING.

    •   Do you think any part of the course could have been done better? How can it be
        improved for the next group of participants?

    •  Were there certain portions of the course you really liked and found most valuable?

    *  Could the other portions of the course be made more useful?

    *  What will you take away from this course and use in practice?

    »  What types of follow-up to this course would you  like to see?

Please provide your comments in your written evaluations as well and we will be sure to
consider the necessary changes for future courses. At this point in time, there is no one more
qualified than yourself to critique this course.

    •  Does everyone have a copy of the evaluation form distributed on the first day of class?

DISTRIBUTE HANDOUT # 1-3 (EVALUATION FORM) TO ANY PARTICIPANT WHO NEEDS A NEW
COPY.
                                         13-2
        July  1998

-------
Principles of Environmental Impact Assessment Review	Facilitator's Manual

    / thank you in advance for your help for your critique and observations.

    Please place your evaluations in a pile on the table as you leave. I will return to this room
    about half an hour from now to collect the completed evaluations.  Before I leave, does
    anyone have any questions about this evaluation form, or questions or comments for me or
    the rest of the class?

PAUSE TO ALLOW PARTICIPANTS TO BROWSE THE QUESTIONNAIRE. ANSWER ANY QUESTIONS
THAT ARE RAISED.

       Thank you, and good luck.
                                        13-3                               July 1998

-------
Principles of Environmental Impact Assessment Review
Facilitator's Manual
                                         13-4
         July 1998

-------
    APPENDIX A


 Case Study Information

•     Selecting a Case Study

>     Case Study Summary Format

1     Case Study Summaries

     - Highway Project
     - Habor Improvement Project
     • Copper Mine
     - Deforestation/Forest Management

-------

-------
Principles of Environmental Impact Assessment Review	Facilitator's Manual

                             SELECTING CASE STUDIES
This course relies heavily upon the use of actual Environmental Impact Assessments (EIAs) such
that participants learn the environmental impact assessment review process while reviewing
components of real environmental impact assessments. Four case study environmental impact
assessment documents are used in the course, in both draft and final form, and each student
reviews both the draft and final version of the same environmental impact assessment.

Four case study environmental impact assessments from the United States are available for use in
this course. Facilitation materials specific to these case studies, such as annotated outlines,
summaries, and related documents, have been created or compiled for use in this course.
However, it is possible to replace up to three of these case studies with in-country environmental
impact assessments, where appropriate. In-country case studies may be seen as more interesting
and relevant to course participants than environmental impact assessments from elsewhere.  Any
case study substitution should be discussed and coordinated with the U.S. EPA's module manager
and facilitation team leader.  The following section discusses criteria that should be applied when
deciding whether to substitute in-country environmental impact assessments for the pre-prepared
U.S. environmental impact assessments.

Selection Criteria

Selecting appropriate case study environmental impact assessments is important, because they are
used to provide students with "hands-on" experience practicing the use of concepts and
techniques from the course material. The following criteria should be used when determining
whether to substitute in-country environmental impact assessments (or, if in the U.S., other U.S.
environmental impact assessments) for one or more (up to three) of the four available U.S.
environmental impact assessments.  These criteria can be met by a single candidate case study
document, or by a combination of all selected documents that together meet the criteria.  The
criteria are presented with empty check boxes to help keep track of which criteria the case studies
meet:

Case Study No.
 1234
D D D  D   The case study document has sections addressing Scoping, Purpose and Need,
             Alternatives, Affected Environment, Environmental Impacts, and Mitigation. It is
             also desirable, but not required, that it has sections dealing with Monitoring and
             Follow Up, and a Record of Decision (ROD) or a ROD summary.
                                          A-l                      July 1998

-------
Principles of Environmental Impact Assessment Review
Facilitator's Manual
O D D D   The case study assesses a range of issues and impacts, including primary,
              secondary, and cumulative impacts.

D D D D   Included in the case study environmental impact assessment are discussions on
              both the natural and human (socioeconomic) environment.

DDDD   There is a range of alternatives presented in the case study.

D D D D   Significant issues are addressed by the case study document.
The four case studies in combination present a range of sector/natural resource issues:

Case Study No.
 1234
D n D O   infrastructure related to development (e.g., highway, airport, sewer line, new port,
              etc.);

D D D D   activity related to natural resource use (e.g., mining, logging);


D O  D D   water resource issues (e.g., watershed, dam, river, sedimentation, etc.);


D D  D D   wetlands and habitat destruction; and


O D  D D   small community disruption issues, issues of historic or cultural significance.
The four case studies in combination present a range of possible outcomes from the review:

Case Study No.
 1234.
DDDD    issues requiring additional data gathering;


D D  D  D    major issues regarding project concept and alternatives related to basic purpose
              and need for the project and proposed scale;
                                           A-2
         May 1998

-------
Principles of Environmental Impact Assessment Review
                                                                       Facilitator's Manual
D D D D   major issues regarding environmental impact potentially causing disapproval or
              withdrawal .with the opportunity for constructing a positive outcome; and

D D D D   a basically sound environmental impact assessment with comments directed to
              mitigation.


D D D D   The case study has both a draft and a final version. (The final will be used for the
              last exercise, so it should have some "faults.")


D D D O   The language used in the case study document can be read and spoken by all or
              almost all of the course participants, or it can be translated to meet this
              requirement.


D D D D   The case study does not raise highly sensitive political issues. (Case studies that
              raise highly sensitive political issues may make it difficult or impossible for certain
              participants to learn effectively  during the course.)

D D D D   The document has some discernible flaws, preferably across the board, but at least
              in three of the six review areas.  Flaws should not be so basic or extensive that the
              document can not be reviewed.

D D O D   Outlines of the documents have been (or can be) annotated so that you know
              where each of the topics that are addressed by exercises are located.

D D D D   There is a summary (or summary can be developed) of the environmental impact
              assessment development process for each document.

D D D D   There is a fairly complete analysis of each document, organized by review topic, or
              such an analysis could be readily developed.
D D D  D    Associated documents (appendices, for example) are either available or have been
              summarized for distribution.

In general, shorter documents that meet the above criteria are preferable to longer documents, as
time is limited during the course. Also, case studies that will best facilitate the learning process
In general, snorter documents that meet the above catena are preferable
time is limited during the course. Also, case studies that will best facilitate the learning process
should be selected over those that, while meeting all of the above criteria, may not be as effective
at facilitating learning (e.g., an environmental impact assessment document that is too "dry" or
                                           A-3
                                                                                May 1998

-------
Principles of Environmental Impact Assessment Review
Facilitator's Manual
too "technical").  This is in large part a subjective decision, and must be made by those putting on
the course, in conjunction with the U.S. EPA's training liaison and facilitation team leader.

Preparation of Facilitation Materials

This Facilitator's Manual contains pre-prepared facilitation materials that will help you to facilitate
the Principles for Review of Environmental Impact Assessments course. Depending on which
environmental impact assessment case studies you select for your course, you may or may not
need to develop additional facilitation materials.

If you plan to use the four U.S. environmental impact assessment case studies available from the
U.S. EPA for use in this course, all facilitation materials related to these case studies have already
been prepared for you.  However, if you plan to substitute other Environmental impact
assessments, such as in-country environmental impact assessments, for the U.S. environmental
impact assessments, you will need to develop additional facilitation materials specific to those
documents.

Additional materials that must be created for substitute case study environmental impact
assessments include some or all of the following:

•      Annotated outlines of each environmental impact assessment, which indicate where each
       of the topics that are addressed by exercises are located.

•      A summary of the development process for each environmental impact assessment (if such
       a summary does not already exist).

*      A fairly complete analysis of each environmental impact assessment, organized by review
       topic (if such analyses do not already exist).

•      Associated documents (appendices, for example).

This Facilitator's Manual, and the flip charts and handouts that accompany it, contain all other
facilitation materials necessary for the course.  This course is designed to be held in a variety of
locations around the world. If you do have to  create additional facilitation materials, they will
most likely be limited to explanatory text to accompany the substitute environmental impact
assessment documents.
                                           A-4
         May 1998

-------
Principles of Environmental Impact Assessment Review	Facilitator's Manual

                      CASE STUDY SUMMARY FORMAT

USEPA's four-day training course entitled Principles of Environmental Impact Assessment
Review Training introduces participants to several real Environmental Impact Assessment Case
studies during the course.  In addition to obtaining actual copies of the draft and final
environmental impact assessments, comment letters,-relevant documents such as the record of
decision and support materials, summary descriptions and analyses must be prepared for
incorporation into the facilitator's manual. This guidance provides sample formats and content to
create the necessary summary descriptions of the Environmental Impact Assessment case study
documents.

The following documents should be prepared for each case study:

   •   A list of all the relevant documents including all draft documents, all final documents, the
       ROD, all comment letters or any other relevant correspondence, and any thing relevant to
       the Region's critique of the document. All relevant documents should be included in
       the package provided to the organizers of the course so appropriate copies can be
      produced for course participants.

   *   An index of where key information is to be found in the draft Environmental Impact
       Assessment document

   •   A series of summaries of the key issues and points [1 for each element of the document
       (scoping, purpose and need and alternatives, environmental setting,  impact, and
       mitigation) and 1 for the Record of Decision]

   •   A chronology of key events that occurred in the development  of the Environmental Impact
       Assessment from project initiation through implementation, monitoring and follow-up

When writing your summary please:

   •   Ensure that the page numbers for all relevant pages are cited on the index.

   •  Remember that this summary will be used by the facilitators of the Environmental Impact
       Assessment Review Training and that they may be unfamiliar with the primary documents
      prior to their preparation for the course.

   •  Provide clear and concise information that will aid in prompting discussions on the:
       *   Key issues and concepts in this section
       »•   Strengths of this section
       *•   Weaknesses of this section.
       Please write your answers to these questions in narrative form.
                                         A-5                                 July 1998

-------
Principles of Environmental Impact Assessment Review
Facilitator's Manual
The following narrative is an example of a summary of the Purpose and Need and Alternatives
element of an Environmental Impact Assessment document.
                                    EXAMPLE
 Draft Environmental Impact Study - Southern Grand State Transportation Project -
 Hiehwav Corridor Small Town to Urban City
 Environmental Impact Assessment Document Title
 March 1998
 Date Prepared
 United States Department of Transportation Federal Highway Administration and Grand
 State Department of Transportation
 Document Prepared By
 United States Environmental Protection Aeencv
 Document Reviewed By (Agency Name)
                       Purpose and Need and Alternatives

1. Is there an adequate project description, including area maps showing the project site
   and land use features, site map showing property boundaries, location and purpose of
   all structures, detailed description of project activities including construction, operation
   and closure as well as the location/areas and  time frames for the activities, and a
   description of the materials flow?

   Yes. In summary, the proposed project is located in the middle portion of the United States,
   in the State of Grand. This project involves constructing and improving a 4-lane, divided
   freeway type of road between metropolitan centers and crossing the southwest portion of the
   state. Southwestern Grand primarily contains small towns, agriculture, and undeveloped
   areas. The land use features, property issues, and project activities during the phases of the
   project are addressed in the document.

2. Are the purpose and need for the project demonstrated and adequately described?

   The Purpose and Need section provides a logical and well-balanced discussion of why the
   project should be developed, focusing on aspects of economics and transportation, including
   economic development, system linkage and highway continuity, safety, traffic flow, air quality
   conformity, and intermodal relationships (e.g., with maritime centers, airports).
3. Does the proposed project meet the purpose and need?
                                        A-6
         July 1998

-------
Principles of Environmental Impact Assessment Review	Facilitator's Manual

    Yes. Several different needs were identified such as road safety improvement, system linkage
    and highway continuity, traffic improvements, and economic development, are addressed by
    the proposed project. However, an assumption seems to be made that road construction is
    good for economic development for all areas affected by the construction.

4.  Are a sufficient range of alternatives identified, including "no-action," reasonable,
    feasible alternatives, reflective of the range of choices?

    The issues identified in purpose and need are complex and although the range of alternatives
    includes "no-build," "transportation management," and highway upgrade alternatives, the
    analysis is insufficient as a full range of choices. There is no clear summary of the alternatives
    that will be evaluated in subsequent sections of the Environmental Impact Assessment.
    Potentially feasible economic development alternatives are not evaluated, including such
    efforts as improving the area's rail network, creating rural enterprise zones, expanding job
    training, and constructing a high technology park(s).

    Additionally, while the discussion of the Purpose and Need focused on economics, the
    economic implications of the highway alignments (other than cost) were not considered in the
    development of alternatives.

5.  Do the alternatives  satisfy the purpose and need?

    While the alternatives presented do satisfy the purpose and  need if certain assumptions are
    made, the analysis has not been detailed enough to support  the range of alternatives that have
    been presented.

                                      EXAMPLE
                                          A-7                                  July 1998

-------
Principles of Environmental Impact Assessment Review
                             Facilitator Manual
 Environmental Impact Assessment Document Title
 Date Prepared
 Document Prepared By
 Document Reviewed By (Agency Name)
                       INDEX OF DOCUMENT CONTENTS
REVIEW ELEMENT
RELEVANT PAGES IN THE DRAFT ENVIRONMENTAL
IMPACT ASSESSMENT DOCUMENT
1. Scoping
2. Purpose and Need and Alternatives
3.  Environmental Setting
4. Impact
5.  Mitigation
6. Record of Decision
                                    A-8
                                    July 1998

-------
Principles of Environmental Impact Assessment Review
Facilitator Manual
  Environmental Impact Assessment Document Title
  Date Prepared
  Document Prepared By
  Document Reviewed By (Agency Name)
                           SCOPING REVIEW SUMMARY

1. Is scoping addressed in this document? If not, is it documented in a different
   document? If so, which document?
2. Does it identify all of the significant issues for the natural environment? For the human
   environment?
3. How were issues identified as significant?
4. Are insignificant issues dismissed or discussed?
5.  Are all of the interested and affected parties identified? Were views solicited from
   them?
6. What are the omissions (e.g.,issues, interested parties) of any?
7. Are the key issues brought into focus?
8.  Is the geographic area adequately identified or characterized?
9.  Does the scoping description provide sufficient detail to define the spatial and temporal
   scope of analyses required for each resource?
                                       A-9
       July 1998

-------
Principles of Environmental Impact Assessment Review
Facilitator Manual
  Environmental Impact Assessment Document Title
  Date Prepared
  Document Prepared By
  Document Reviewed By (Agency Name)
                       Purpose and Need and Alternatives

1. Is there an adequate project description, including area maps showing the project site
   and land use features, site map showing property boundaries, location and purpose of
   all structures, detailed description of project activities including construction, operation
   and closure as well as the location/areas and time frames for the activities, and a
   description of the materials flow?
2. Are the purpose and need for the project demonstrated and adequately described?
3. Does the proposed project meet the purpose and need?
4. Are a sufficient range of alternatives identified, including "no-action," reasonable,
   feasible alternatives reflective of the range of choices?
5.  Do the alternatives satisfy the purpose and need?
                                       A-10
       July 1998

-------
Princioles of Environmental Impact Assessment Review	Facilitator Manual
  Environmental Impact Assessment Document Title
  Date Prepared
 Document Prepared By
 Document Reviewed By (Agency Name)
                              Environmental Setting

10.   Was each attribute and affected community addressed adequately and accurately?



11.   Was a baseline established so that impacts could be measured?
12.    Was expected information and data provided, adequately documented, and used
      appropriately?
13.    Was the information presented linked back to the project description and purpose
      and need and alternatives?
14.    Was the level of analysis appropriate?
15.    Was the region of impact/influence delineated, including boundary areas?
16.    Is the section internally consistent?
                                       A-ll                               July 1998

-------
Principles of Environmental Impact Assessment Review
Facilitator Manual
  Environmental Impact Assessment Document Title
  Date Prepared
  Document Prepared By
  Document Reviewed By (Agency Name)
                             Environmental Impact

1. Are direct, indirect, and cumulative impacts identified?
2. Were potential impacts associated with all stages of the project identified?
3. Was the significance of impacts adequately determined?
4. Were the approach and methodology used to predict impacts clearly presented and
   adequate?
                                      A-12
       July 1998

-------
 Principles of Environmental Impact Assessment Review
Facilitator Manual
  Environmental Impact Assessment Document Title
  Date Prepared
  Document Prepared By
  Document Reviewed By (Agency Name)
                                    Mitigation

1. Is a mitigation plan included in the document?
2. Are mitigation options feasible, and are mechanisms for covering their costs adequately
   described?
3. Are all significant impacts addressed by the mitigation plan?
4. Is a monitoring plan included in the document?
5. Are adequate implementation plans specified for mitigation?
6. Are responsible parties identified and committed to implementation?
                                       A-13
       July 1998

-------
Principles of Environmental Impact Assessment Review
Facilitator Manual
  Environmental Impact Assessment Document Title
  Date Prepared
  Document Prepared By
  Document Reviewed By (Agency Name)
                                Record of Decision

1. Is the purpose and need for the action stated in the Record of Decision?

2. Is there an overview of the specific impact assessment process that was followed (e.g.,
   what was done during the development of the document to gain input from interested
   and affected parties)?
3. Does the Record of Decision have an adequate description of the proposed action?

4. Does the Record of Decision contain a description of the alternatives considered? Is the
   environmentally preferred alternative identified?
5. Are the environmental impacts associated with the proposed action and the alternatives
   included?
6.  Does the Record of Decision include a detailed justification?
7.  Does the Record of Decision contain a summary of the mitigation action plan where
   required?

8.  Are responsible parties identified and committed to implementation?
                                       A-14
       July 1998

-------
  Draft Environmental Impact Study - US 113 Planning Study: Snow Hill. Maryland to
  Delaware State Line. Worcester County. MD.

  Mav 1997
  United States Department of Transportation Federal Highway Administration and
  Maryland State Highway Administration

  United States Environmental Protection Agency
  Document Reviewed By (Agency Name)
DRAFT- US U 3 DEIS
Case Study: Highway 113-1
April, 1998

-------
Principles of Environmental Impact Assessment Review
                                     Facilitator Manual
                        INDEX OF DOCUMENT CONTENTS
REVIEW ELEMENT
      RELEVANT PAGES IN THE DRAFT ENVIRONMENTAL
      IMPACT ASSESSMENT DOCUMENT
1. Scoping
                   Attached news articles and additional EPA letters on the Preliminary DEIS
                   Chapter VI. Comments and Coordination
                         Page VI-101 EPA Letter
                         Page VI-105a EPA Letter
                         Page VI-116 Maryland Office of Planning Letter
                         News Articles and Letters from Congressionals and Constituents

2. Purpose and Need and Alternative
                   Summary and Summary Table S-l
                   Chapter I Purpose and Need
                         Page 1-8 Table on Accident Statistics (note, they did not include
                         fatality break down for sensitivity of the families whos relatives
                         were involved)
                   Chapter II Alternatives Considered
                         Page II-1
3. Environmental Setting

                                   Chapter III Affected Environment
                                   Pages 111-36-52 Descriptions of Wetland Sites
4. Environmental Impact
                                   Chapter IV Environmental Consequences
                                   Page IV-22-23 - Indirect impacts
                                   Page IV-31 Forest Impacts
                                   Page IV-46 Impacts to aquatic biota
                                   Page IV-51 Pocomoc River Impacts
5. Mitigation
                                   Mitigation Plan (not part of the DEIS)
6.  Record of Decision
                                   Alternatives Considered Page 4
                               Minimizing impacts Page 7
DRAFT-US 113 DEIS
Case Study: Highway 113-2
April, 1998

-------
 Principles of Environmental Impact Assessment Review	    Faciiitator Manual
  Draft Environmental Impact Study - US 113 Planning Study: Snow Hill. Maryland to
  Delaware State Line. Worcester County. MD,

  May 1997
  United States Department of Transportation Federal Highway Administration and
  Maryland State Highway Administration

  United States Environmental Protection Agency
  Document Reviewed By (Agency Name)
                            SCOPING REVIEW SUMMARY

 1.  Is scoping addressed in this document?  If not, is it documented in a different
    document? If so, which document?

 Yes, however because of the number of letters from citizens and public officials (thousands),
 another document with all the letters is available upon request from the Maryland State Highway
 Administration. In addition, because there was a preliminary DEIS, which was circulated only
 among the resource agencies, those letters that were received were not included in the DEIS.
 Those letters are helpful because the most changes occurred between the pre-DEIS and the DEIS.
 Those letters from EPA and the US ACE only are attached.

 2.  Does it identify all of the significant issues for the natural environment?  For the human
    environment?
 Yes, based on communication with resource agencies, however, the scoping was short on
 cumulative impact assessment (it did not include a CIA) and had to be reassessed in the DEIS
 stages.

 3.  How were issues  identified as significant?

 Issues that were identified as significant were identified by providing additional detailed
 information on the issues. Although some issues that were identified as significant by the resource
 agencies were dismissed and therefore not addressed in sufficient detail. Example, the resource
 agencies believe that this project will contribute to secondary growth along the road.  However,
 SHA did  not agree and believed that with the road, only 1% additional growth would occur than
 without it. This was not  resolved and SHA went ahead without addressing it in the DEIS.

 4.  Are insignificant issues dismissed or discussed? They are discussed briefly and dismissed.

 5.  Does it identify all of the interested and affected parties? Were views solicited from
    them? Yes. The DEIS does an adequate job of identifying interested or affected parties.
DRAFT- US 113 DEIS          Case Study: Highway 113-3                    April, 1998

-------
 Principles of Environmental Impact Assessment Review
                                        Facilitator Manual
 6.  What are the omissions (e.g.,issues, interested parties) of any? As stated before, the
    cumulative impact assessment was not defined until after the DEIS was issued and the
    secondary impacts were not addressed because SHA did not believe there would be secondary
    impacts.

 7.  Are the key issues brought into focus?
 Yes, for example, it was clear early on that this project was wanted by the public. There was a
 public group formed called "CRASH" specifically to advocate the widening of the road. The
 political pressure was also identified early on.  This project was predetermined.

 8.  Is the geographic area adequately identified or characterized?
 Yes, although more details of the poultry industry and truck traffic was provided in the DEIS as
 information unfolded.

 9.  Does the scoping description provide sufficient detail to define the spatial and temporal
    scope of analyses required for each resource?
 No, 'we requested that the boundaries be widened to include discussions of the Pocomoc River,
 which is a state area of concern because of its unique Bald Cypress Swamp habitat.  While it is
 not directly bisected by the road, its tributaries are. In addition, we requested addition discussions
 on the coastal  areas because the growth which is planned as part of the Worcester County Plans is
 mainly based in this area.  Finally, for the cumulative impact studies, we requested that a historical
 overview be given, based on existing data.  However, this was not identified until the DEIS was
 circulated for review and not at the early scoping stages.
DRAFT- US 113 DEIS
Case Study: Highway 113-4
April, 1998

-------
 Principles of Environmental Impact Assessment Review	Facilitator Manual

                           Purpose and Need and Alternatives
  Draft Environmental Impact Study - US 113 Planning Study: Snow Hill. Maryland to
  Delaware State Line. Worcester County, MD.

  May 1997
  United States Department of Transportation Federal Highway Administration and
  Maryland State Highway Administration

  United States Environmental Protection Agency
  Document Reviewed By (Agency Name)
Purpose and Need and Alternatives

1.  Is there an adequate project description including area maps showing the project site
    and land use features, site map showing property boundaries, location and purpose of
    all structures, detailed description of project activities including construction, operation
    and closure as well as the location/areas and time frames for the activities, and a
    description of the materials flow?

    Yes. In summary, the proposed project is located in the southeastern United States, on the
    eastern shore of Maryland. This project involves the construction of a rural 2-lane undivided
    type road to a 4-lane, divided highway (23.8 miles).  The area is described primarily as rural
    and consists of small town developments, agriculture and undeveloped areas. However, 113
    serves as a connector between Delaware and Virginia through Maryland. The northern
    segment also experiences high summer traffic volume because of the beach resort town of
    Ocean City, MD, located east of the existing road. Land use features, maps and a description
    of the area are described in the document.

2.  Are the purpose and need for the project demonstrated and adequately described?

    The Purpose and Need section provides a focused discussion on safety problems associated
    with the road (from 1980-1995 there have been 41 people killed on the N/S road segments
    combined) and traffic congestion data. However, the purpose and need claims that economic
    development is not considered part of the need for the widening of the road, even though the
    Worcester County Plan includes the upgrade of the road as part of the future growth of the
    County.
3. Does the proposed project meet the purpose and need?

   To some extent, however, it is not clear that the widening will actually alleviate the high


DRAFT- US 113 DEIS          Case Study: Highway 113-5                    April, 1998

-------
Principles of Environmental Impact Assessment Review
                                         Facilitator Manual
    number of fatalities that occur on the road  While the document claims that the severity of the
    accidents will be less, the widening will not necessarily largely reduce the number of accidents.
    Because of the public and political pressure in favor of  widening US 113, these issues were
  - not resolved.

4.  Are a sufficient range of alternatives identified, including "no-action", reasonable,
    feasible alternatives reflective of the range of choices?

    Partially. A wide array of build alternatives and configurations to reduce impacts to
    ecologically sensitive areas were brought forward in the document.  However, if the purpose
    and need would have focused on the actual problems linked to accident fatality (51% of the
    fatalities were alcohol related and 31% were truck related) other alternatives such as reducing
    truck traffic, providing tighter alcohol enforcement and increasing police patrol could have
    satisfied the purpose and need of the project.  However, too much pressure was being forced
    on the resource agencies to "give in."  The picture of this project was painted as "inevitable"
    and a 'losing battle".

5.  Do the alternatives satisfy the purpose and need?

    Not necessarily. While the claims are made that the alternatives presented do satisfy the
    purpose and need based on the assumption that the severity of the accidents will be alleviated,
    the root cause of the accidents were not addressed.
DRAFT- US in DEIS
Case Study: Highway 113-6
April, 1998

-------
Principles of Environmental Impact Assessment Review    	Facilitator Manual

Draft Environmental Impact Studv - US 113 Planning Studv: Snow Hill.
Delaware State Line. Worcester County, MD.
May 1997
Maryland to

United States Department of Transportation Federal Highway Administration and
Maryland State Highway Administration
United States Environmental Protection Agency
Document Reviewed By (Agency Name)

                              Environmental Setting

1.     Was each attribute and affected community addressed adequately and accurately?
   Yes. However the emphasis on the importance of some of the resources were underestimated.
(See important pages above)

2.     Was a baseline established so that impacts could be measured?
   Yes. However, it took some pushing to get the SHA to include cumulative assessment and
provide a larger geographical area to provide a baseline from. We requested that the baseline area
established around a watershed area and not just an outline of the road configurations.
3.     Was expected information and data provided, adequately documented, and used
       appropriately? Yes.
4. Was the information presented linked back to the project description and purpose and
   need and alternatives?
Yes, in that the descriptions were focused on the alternative alignment areas.

5. Was the level of analysis appropriate?

For the most part.

6. Was the region of impact/influence delineated, including boundary areas?

Yes.

7. Is the section internally consistent?
Yes.


DRAFT- US 113 DEIS         Case Study: Highway 113-7                   April, 1998

-------
 Principles of Environmental Impact Assessment Review
                                        Facilitator Manual

Environmental Impact Assessment Document
Date Prepared
Title
Document Prepared By
Document Reviewed By (Agency Name)
                               Environmental Impact

 1.  Are direct, indirect, and cumulative impacts identified?
 Direct impacts are identified. For the preferred alternative the summary chart matrix (S-l, DEIS)
 explains all the impacts to wetlands, upland forested areas, historical sites, and relocations. The
 document does not include a thorough discussion of the indirect impacts. (Page IV-22, DEIS) As
 stated previously, the SHA does not believe that there will be indirect impacts associated with the
 road. Cumulative impacts are addressed but do not provide and conclusive analysis. It is based
 on existing information and no new information was attempted.

 2.  Were potential impacts associated with all stages of the project identified?

 N/A
3.  Was the significance of impacts adequately determined?
No. The importance of many of the resources effected were underestimated.  For example, page
IV-46 there is a discussion on the aquatic biota. In this rural area where there are not a lot of
paved areas, it seems that the impacts of the surface pollutant load would be greater than what is
presented in the DEIS. Also the significance of the importance of the resources are under
emphasized. Such as the description of the Pocomoc River (Page IV-51) and Wetland 8 which
contains a Bald Cypress Swamp (Page 111-37). (This also can be a problem with the Existing
Environment section).  Up to 111 acres of forests would be impacted by the project, however the
significance of this in the context of the whole eastern shore was not described (page IV-31).
4. Were the approach and methodology used to predict impacts clearly presented and
   adequate?
On some issues, but not all.  For example, the wetland functions was clearly stated but the
determination that the aquatic resources, groundwater, forests and forest interior dwelling birds
was not adequately explained.
DRAFT- US 113 DEIS
Case Study: Highway 113-8
April, 1998

-------
Principles of Environmental Impact Assessment Review	Facilitator Manual

                                     Mitigation

1.  Is a mitigation plan included in the document?
A brief mitigation description is included in the document but not sufficient enough for the needs
of the document. A separate plan has been developed, but the details of the plan has still not been
finalized.  The separate document is attached.
2.  Are mitigation options feasible, and are mechanisms for covering their costs adequately
    described?

The mitigation options are feasible, but not yet finalized. The mechanisms for covering their costs
are not described, nor is the commitment to complete the final designs clear (see ROD).

3.  Are all significant impacts addressed by the mitigation plan?

Yes.

4.  Is a monitoring plan included in the document?
No, there is no monitoring plan available. Even the Record of Decision is short on showing
commitment to monitoring (the who, what, where and whys.)

5.  Are adequate implementation plans specified for mitigation?
Implementation plans are more specified in the separate Draft Wetland Mitigation Concept Plan.

6.  Are responsible parties identified and committed to implementation?

Responsible parties are genetically identified, but specific details are not addressed.
DRAFT- US 113 DEIS          Case Study: Highway 113-9                    April, 1998

-------
Principles of Environmental Impact Assessment Review
                                  Facilitator Manual
                            Record of Decision

1. Is the purpose and need for the action stated in the Record of Decision?

No, though it is explained in the selection of alternatives.

2. Is there an overview of the specific impact assessment process that was
   followed (e.g., what was done during the development of the document to
   gain input from interested and affected parties)?

No, only a broad statement that the DEIS was circulated for review. (Page 4).

3. Does the Record of Decision have an adequate description of the proposed
   action?

Yes, it is described in detail up front. (Pages 1-4)

4. Does the Record of Decision contain a description of the alternatives
   considered?  Is the environmentally preferred alternative identified?

Yes, it is identified and explained that the environmentally preferred alternative
would not have satisfied all the safety needs of the project. (Page 5)

5. Are the environmental impacts and associated with the proposed action and
   the alternatives included?

No. Only where the environmental impacts evaluation can be found. (Page 5)

6. Does the Record of Decision include a detailed justification?

Yes, the ROD includes detailed justification for the selected alternative.

7. Does the Record of Decision contain a summary of the mitigation action
   plan where required?

No, while avoidance and minimization is documented in the ROD, the mitigation
action plan is not summarized. (Page 9)
DRAFT- US 113 DEIS
Case Study: Highway 113-10
April, 1998

-------
Principles of Environmental Impact Assessment Review	Facilitator Manual

8. Are responsible parties identified and committed to implementation?

Partially.  Some agencies are identified in the commitment for enforcement, but
additional commitments should be made, such as expertise, to ensure success of
mitigation efforts. (Page 11)
DRAFT- US 113 DEIS        Case Study: Highway 113-11          .        April, 1998

-------
Principles of Environmental Impact Assessment Review
                                                  Facilitator Manual
                             Chronology of Key Events
  (include all key events identified on the Environmental Impact Assessment Process Flow Chart
             and any other events that shaped the development of this assessment)
                    KEY EVENTS
 1/14/97

 2/19/97

 3/19/97

 3/25 & 26/97


 4/28/97


 4/16/07

 4/30/97

 6/17/97

 10/15/97

 11/19/97

 1/21/98

2/98

 3/98

4/98
Publish Notice of Intent (DEIS)

Distribution of Preliminary DEIS to Agencies

Presentation of new alternatives to resource agencies

Inter-Agency meeting to review revised new alternatives and receive
comments on DEIS.

Review of revised DEIS with Federal Highway Administration, Resource
Agencies etc..

Public Notice

DEIS Availability Published in Federal Register

Public Hearing

Present Selected Alternative to Interagencies

Preliminary FEIS to agencies

FHWA Signs FEIS

Final EIS Circulated for Public Review

Mitigation Package Circulated for Review

Draft ROD Issued
DRAFT- US JJ3 DEIS
          Case Study: Highway 113-12
April, 1998

-------
Principles of Environmental Impact Assessment Review
                                     Facilitator Manual
List of all Relevant Documents
(at a minimum list should include the Draft Environmental Impact Assessment, comment letter,
Final Environmental Impact Assessment, Record of Decision, and Mitigation Plan)
Date Title Author
3/31/97
3/31/97
3/31/97
3/31/97
5/97
7/18/97
7/17/97
7/18/97
7/23/97
11/12/97
2/98
3/24/98
4/98
EPA Comment Letter on the Pre-DEIS
US ACE Comment Letter on the Pre-DEIS
USFWS Comment Letter on the Pre-DEIS
NMFS Comment Letter on the Alternates Retained
DEIS
EPA Comment Letter on DEIS
USFWS Comment Letter on DEIS
US ACE Comment Letter on the DEIS
NMFS Comment Letter on the DEIS
US ACE Comment Letter on the DEIS'
FEIS
Draft Mitigation Concept Plan
Draft ROD
Danielle Algazi
Michele Gomez
Dave Sutherland
John Nichols
SHA/FHWA
Danielle Algazi
Dave Sutherland
Michele Gomez
John Nichols
Michele Gomez
SHA/FHWA
SHA
FHWA
DRAFT-US 113 DEIS
Case Study: Highway 113-13
April, 1998

-------

-------
APPENDIX B



   Flipcharts

-------

-------
*     Welcome to
           the
        Principles
           of
      Environmental
   Impact Assessment
        Review
        Training
                  Flip Chart Session 1-1

-------

-------
      Course Goal
To support your capacity to
review environmental impact
assessment documents and
participate in the
environmental impact
assessment process.
                      Flip Chart Session 1-2

-------

-------
Reviewer  Situations
               Solo Reviewer
               The "solo reviewer"
               isolated technical review
               without external assistance,
               little context Information..,
               Empowered Reviewer
               The "empowered reviewer builds own
               Informal networks and resources...
               keeps up on environmental, economic
               and social context information relevant
               to project and program reviews-uses
               networks effectively
               Lead Reviewer
               The "lead reviewer" manages..."lead"
               concept...$ for experts, provides formal
               organizational links to experts upon
               which can draw...needs interpersonal
               skills and management
               and communications ability to pull
               together interdisciplinary team...
               holistic perspective, timely...
               gives advice...
               Proactive Reviewer
               The "proactive reviewer"...has upfront
               lnvolvement...attempt to Influence
               document...will review to get
               best possible...w!thout compromising
               Independence...Can be with a situation
               •b" or -c"...
                                          Flip Chart Session 1-3

-------

-------
     Ground Rules
Listen while others are speaking



Respect others' opinions



There are no wrong answers



Use your imagination
Timeliness
Participate
                       Flip Chart Session 1 -4

-------

-------
                       Agenda
Dav1
Registration
1.   Welcome and Introduction
2.   Reviewer's Role (Break included)
Lunch
3.   Overall Review and Scoping (Break included)
4.   Review of Purpose and Need and Alternatives
Adjourn
 8:30
 9:10
10:00
12:00
 1:00
 3:05
 5:00
5.   Review of Description of the Environmental Setting    8:30
     (Break included)
6.   Review of Potential Environmental Impacts (Lunch    10:45
     included)
     Report Out                                       1:20
7.   Review of Proposed Mitigation (Break included)        2:20
8a.  Introduction to Review of the Draft Environmental      4:00
     Impact Assessment
Adjourn                                              5:00
Day 3
8b.  Preparing and Communicating Reviewer
     Comments (Break and lunch included)
     Report Out
     Discussion of Public Comment
9.   Final Environmental Impact Assessment Review
     (Break included)
Adjourn
 8:30

 1:00
 2:00
 2:30

 5:00
Day 4
10.  Prepare a Record of Decision and Mitigation Plan      8:30
     (Break included)
11.  Resources for a Reviewer                         10:40
Lunch                                               12:05
12.  Country Specific Applications (Break included)         1:30
     Final Wrap-up and Course Evaluation                4:30
Adjourn               :                               5:00
                                              Flipchart Session 1 -5

-------
I

-------
Environmental Impact

 Assessment Definition

Decision-making process

-  Purpose:  Integration of
  environmental, economic, and social
  concerns.

-  Decision-oriented: Requires a
  proposed action and practical
  alternatives.

-  Scope: Project, program, policy,
  and/or plan.

Systematic, interdisciplinary,
reproducible (objective)
documented evaluation of
potential impacts

Involves all affected stakeholders:
public participation is key
                          Flip Chart Session 2-1

-------

-------
CO
CO
LU
o
o
LU
CO
CO
LU
CO
CO
O
<
Q.
LLJ
LU

UJ

-------

-------
Understanding Context
 Legal
 Institutional
                      Flipchart Session 2-3

-------

-------
Understanding Context
 Organizational
 Personal
                      Flip Chart Session 2-4

-------

-------
What is the Focus During
an Environmental Impact
  Assessment Review?
  Completeness - Coverage
  Significance
  Adequacy
  Integrity
  Accuracy
  Influence
                     Flip Chart Session 2-5

-------

-------
Environmental Impact
Assessment Document
        Contents	
Cover Page, Summary, Table of
Contents
Purpose and Need
Scoping
Alternatives
Environmental Setting
Environmental Impacts
Mitigation
Lists of Preparers, and Agencies,
Organizations, and Persons that
Received Copies of the Report
Index and Appendices
                      Flip Chart Session 2-6

-------

-------
Road Map for Overall
Environmental Impact
Assessment Document
     Review (1)
  Review Table of Contents and
  Executive Summary

  Scan and read the document
  several times

  Take notes, write down questions

  Go through key environmental
  impact assessment elements
  -  Purpose and Need, Alternatives,
     Environmental Setting, Impact,
     Mitigation

  Use checklists where appropriate

  Review the logic and consistency
  of the document
                          Flip Chart Session 3-1

-------

-------
Road Map for Overall
Environmental Impact
Assessment Document
      Review (2)
  Use a systematic approach to
  Identify areas where the
  assessment is:
  -  Incomplete, inadequate
  -  Significance unsupported/
     unclear/ignored
  -  Lacks integration

  Identify and adopt perspectives of
  all interested and affected parties

  Compare document to other
  environmental impact
  assessments

  Determine whether the document
  supports decision-making
                          Flip Chart Session 3-2

-------

-------
Road Map for
    Scoping
    Review
Scoping was conducted and
documented

Potentially significant issues are
identified for natural and human
environments

Insignificant issues are identified and
their dismissal justified

Views of all interested and affected
parties are identified and considered

Sufficient detail provided to define the
spatial and temporal scope

Adequate geographic area
considered for the scope

Omissions are not related to
significant issues

Key issues are brought into focus
                           Flip Chart Session 3-3

-------

-------
Tools and Techniques
Information on legal and institutional
requirements, policy, and guidance
Guidelines
Road Maps
Checklists
Student texts
Library
Field reconnaissance
Analytic and predictive models
CIS maps and overlays
Environmental impact assessments
for similar projects, geographic area,
etc.
Consultation by colleagues/outsiders/
experts/academia
Reviewing other reviewer/public
comments
                           Flipchart Session 3-4

-------
I

-------
Advice to Reviewers
                    Flipchart Session 3-5

-------

-------
Project
Purpose and
    Need
Alternatives
                             Flipchart Session 4-1

-------

-------
      Alternatives
No Action

Alternative Sites

Alternative Designs

Alternative Controls

Structural vs Non-structural

Reallocation of Social Costs &
Benefits
                         Flipchart Session 4-2

-------

-------
 Road Map for
    Purpose
 and Need and
  Alternatives
    Review (1)
Describes the purpose and need
of the proposed project


Demonstrates how purpose and
need would be met by the
proposed project

Adequately describes the project
-   Maps project site, surrounding land
   use, and natural features
-   Who and what would benefit; who and
   what would be affected
-   Phases; site preparation, construction,
   operation, and closure
-   Time frames, including when project
   begins and ends

                        Flipchart Session 4-3

-------

-------
    Road Map for
Purpose and Need
and Alternatives
Review (2)
   Considers the full range of
   alternatives to meet purpose and
   need
     No action
   -  Alternative sites, designs, controls
   -  Structural vs non-structural
     Reallocation of social costs and benefits
   -  Reasonable, feasible
   -  Reflective of the range of choices
   -  Meet the purpose and need of the
     proposed project

   Preferred alternative satisfies
   purpose and need better than
   alternatives with less environmental
   impact
                           Flipchart Session 4-4

-------

-------
   Environment Types
   Natural
    Human
(Socioeconomic)
Air Resources

Water Resources
 -Surface Water
 -Ground Water

Soils and Geology

Biological
 Resources

 -Wildlife and
 Vegetation

 -Community and
 Habitat
 Characterization

 -Ecologically
 Significant
 Factors
 Land Use

  Population
  Statistics and
  Housing

 Community
  Services

 Economic Activity
  and Employment

 Transportation

 Cultural or
  Historical
  Resources

 Health and Safety

 Aesthetics
                            Flipchart Session 5-1

-------

-------
      Kinds of Data
Meteorological Data

Ambient Air Quality Data

Data On Sources of Air Pollution

Water Quality and Flow Data

Data pn Sources of Water
Pollution

Data On Surface Topography and
Soils

Information On Biological
Communities

Data On Waste Management and
Pollution Prevention

Socioeconomic Data (including
land use, population and housing,
economic activity, etc.)
                       Flipchart Session 5-2

-------

-------
    Sources of Data
Existing In-house Literature
Relevant Government Agencies
Relevant Research Organizations
Field Surveys
Monitoring Programs
Topographic Maps
Land Use Maps
Geographic Information Systems
Local Specialists
                      Flipchart Session 5-3

-------

-------
    Local Information and
             Sources
Environment
   Type
Information
 Sources
Data
Gaps
How to Fill
 the Gap
                          Flipchart Session 5-4

-------

-------
    Road Map for
   Environmental
   Setting  Review
•   All relevant types of natural and human
    environmental issues are addressed

•   Affected area or community is adequately
    and accurately defined

•   Environmental impact area and surrounding
    features are adequately mapped

•   Baseline is established to measure
    environmental impact

•   Appropriate information and data are
    documented and used appropriately

•   Information is linked back to project
    description, purpose and need, alternatives

•   Levels of detail are appropriate to
    significance

•   Information and data are of acceptable
    quality and relevance

•   Section is  internally consistent
                                Flipchart Session 5-5

-------

-------
Types of Environmental

           Impacts



 Primary Impact

 A primary impact occurs at the same time
 and place as the action. It is usually
 associated with construction, operation, or
 maintenance of a facility or activity and is
 generally obvious and quantifiable.

 Secondary Impact

 Secondary impacts occur later in time, or at
 a different place from the initial action.
 These impacts are indirect or induced
 changes in the environment, population,
 economic growth, and land use.

 Cumulative Impacts

 Cumulative impacts result from the
 incremental impact of the proposed action
 on a common resource when added to other
 impacts from past, present, and reasonably
 foreseeable future actions.  These  include
 the collective effects of individually minor
 actions over a period of time.
                              Fiipchart Session 6-1

-------

-------
     Examples of
Environmental Impacts
                   Flipchart Session 6-2

-------

-------
   Road Map for
   Environmental
   Impact Review
All natural and human (socioeconomic)
environmental impacts are identified

Types of impacts include primary,
secondary, and cumulative

Detail on impacts is balanced among
reasonable and feasible alternatives

Both beneficial and adverse environmental
impacts are identified

Potential environmental impacts are
identified for all phases of the proposed
project

Models, experts, and criteria accurately
used to project the significance of impacts
are valid for appropriate circumstances

Data, information and key assumptions are
representative, accurate, and current

Appropriate criteria are used to assess
significance
                               Flipchart Session 6-3

-------

-------
            Hierarchy of
•        Mitigation Types


  • Avoid or prevent an environmental
    impact
    Minimize an environmental impact
    Reduce or eliminate an
    environmental impact over time
    Correct an environmental impact
    Compensate for an environmental
    impact
                            Flipchart Session 7-1

-------

-------
  Road Map for
     Mitigation
    Review (1)
Specific mitigation measures are
proposed

All significant adverse environmental
impacts are addressed by the
mitigation plan

Measures are proposed for:
-  All types of environmental impacts
-  All phases of the project
-  All environment types

Preferred mitigation measures at the
top of the mitigation type hierarchy
are considered

Mitigation measures are described in
sufficient detail relative to the
significance of impact
                            Flipchart Session 7-2

-------

-------
  Road Map for
     Mitigation
     Review (2)
Mitigation measures are:
-  Technically and financially
   feasible with adequate financial
   and non-financial resources to
   implement the measures

   Socially and culturally acceptable

Implementation plans include
schedules and interim milestones and
timing is consistent with other factors
presented in the assessment of
impact

Responsible parties are identified
and committed to implementation
                           Flipchart Session 7-3

-------

-------
Road Map for Draft
    Environmental
 Impact Assessment
       Review
Establish a management approach:
    Establish leacfreviewer
-   Assign roles
    Establish a schedule
-   Conduct review

Consolidate reviewers' comments:
    Identify most significant issues
    Determine the significance of each
    comment
    Establish common threads
    Resolve any discrepancies

Draft a comment letter:
    Maintain neutrality, objectivity and
    professionalism
    Provide clear and concise
    comments

Anticipate and Respond to Public
Comment
                            Flipchart Session 8-1

-------

-------
 Road Map for the
  Communication
        Letter
State bottom line including major
recommendations up front and clearly

Describe proposed project context

If the purpose and need of the proposed
project is in question, develop the link to
the environmental concerns

Distinguish what is mandatory, what is
significant

Provide a description of the substantive
and/or procedural concerns

Demonstrate sensitivity to all
stakeholders' interests and the affected
community

Provide recommendations for
addressing the concerns
                             Flipchart Session 8-2

-------

-------
Road Map for Final
   Environmental
  Impact Assessment

        Review	

• Establish a management approach

• Determine if basic assumptions and
  information are the same for draft and
  final documents

• Assess impacts of any changes on
  alternatives, impacts and proposed
  mitigation

• Verify that comments were
  acknowledged and addressed

• Review the relationship and
  consistency among responses to
  individual comments

• Consolidate comments and prepare
  the final comment letter
                           Flipchart Session 9-1

-------

-------
 Road Map for Final
Environmental Impact
 Assessment Review(2)
  Determine whether responses change
  fundamental reviewer findings:
  -   Acceptability of environmental
     impact
     Needed mitigation
  -   Adequacy of environmental impact
     assessment document and
     process
     Who needs to be involved and
     consulted

  Decide actions to increase chance of
  correcting remaining deficiencies

  Anticipate use by decision maker

  Anticipate use to establish mitigation
  requirements

  If appropriate, prepare final comment
  letter
                            Flipchart Session 9-2

-------

-------
   Road Map for
       Record of
        Decision
     Preparation
Re-state the purpose and need

Support preferred alternative and justify
    Meets purpose and need
    Either preferred environmentally or
    meets purpose and need better than other
    alternatives
    Meets legal requirements

Demonstrate that all potentially adverse
environmental impacts from the selected
alternative were fully considered

Demonstrate that the benefits of
proposed project outweigh adverse
environmental impacts

Demonstrate that implementation of the
project will be environmentally
acceptable

Address mitigation and continuing
responsibilities
                              Flipchart Session 10-1

-------

-------
   Road Map for
      Mitigation
  Plan Preparation
Proposes specific mitigation measures:
 -   All (significant) adverse impacts
 -   All primary, secondary, cumulative adverse
    environmental impacts
 -   All phases of the project
 -   All relevant environment types (natural and
    human)

Where appropriate, proposes mitigation
measures most desirable in hierarchy

Provides sufficient detail relative to the
significance of each environmental impact

Includes technically and financially feasible
measures
    Financial/other resources
    Socially and culturally acceptable

Includes implementation plans, schedules
and interim milestones, and timing
consistent with other factors

Identifies responsible parties committed to
implement
                               Flip Chart Session 10-2

-------

-------
    Resources for a Reviewer
    •  Colleagues
    •  Student Texts
    •  Resource Manual
    •  CD-ROM - "Environmental
      Assessment Resource Guide"
    •  CD-ROM - "Diamond Chuitna Coal
•    Mining Project - Case Study"
    •  Example Environmental Impact
      Assessments
    •  Internet Sites
    •  Internatipnal Organizations, and
      Academic, Government and other
      Non-Governmental Institutions
                             Flipchart Session 11-1

-------

-------
Country-Specific Contexts
 Legal
 Institutional
 Organizational
 Personal
                        Flipchart Session 12-1

-------

-------
         Reviewer's Code
    / am a reviewer of proposed projects, policies, or
programs.

    I facilitate informed decision-making and follow up
to help ensure that all opportunities for avoiding,
minimizing, preventing,  eliminating, reducing, restoring,
and/or compensating for adverse environmental and
socioeconomic impacts and enhancing the environment
are pursued.

    I am a reviewer of environmental impact
assessment documents to ensure they are complete,
accurate, and identify the significant environmental,
social and economic issues.

    I maintain the integrity of the environmental impact
assessment process by ensuring that the requirements
of the environmental impact assessment process have
been met, and that the perspectives of affected
stakeholders and interested parties have been
considered.

    I bring to my job professionalism, objectivity, and a
systematic, interdisciplinary approach that keeps me
focused on doing my job despite the strongly held views
of those involved with the project, policy or program.

    My job requires me to be resourceful in drawing
upon multiple sources of information and disciplines
including knowing how to find relevant documents,
networks of experts, and background information on the
affected communities and environment.
                                       Flip Chart Session 13-1

-------

-------
                         APPENDIX C

                             Handouts

   The following handouts need to be specifically prepared for each course:

                     •    Participants List
                     •    Certificates of Completion

In addition, the Supplemental Table of Contents for Case Studies and Selected
 Public Comments for Case Studies have not been included in this Appendix.
 They are included in Appendix A or need to be specifically developed if new
                      case studies are substituted.

-------

-------
0)
0)

w
O *^
£'-£
E a.
— 
-------
 i
">
3.
 0)


 CO
 o  o
 (0  4^

 §•»
_E  Q.

ZZ    .fi
 0)
.2
 Q.

"5
                                                                                        i
                                                                                         i

-------
I
1
Q>


ii
« TO
< o.
*j -7;
o o
(0 t
ll
« o
EO
§5
£

(0
£
Q.

"o
;^$».



*••**!:*
    * H

                                                 e
                                                 •i
                                                 I
                                                 3
                                    . (0




                                    |




                                    I


                                    I


                                    cb
                                    I

-------

-------
          Principles of Environmental Impact Assessment Review
                             Training Agenda
Day 1
    Registration
    Session 1:  Welcome and Introduction
    Session 2:  Reviewer's Role (Break included)
    Lunch
    Session 3:  Overall Review and Scoping (Break included)
    Session 4:  Review of Purpose and Need and Alternatives
    Adjourn
    Session 5:  Review of Description of the Environmental Setting
               (Break included)
    Session 6:  Review of Potential Environmental Impacts
               (Lunch included)
               Report Out
    Session 7:  Review of Proposed Mitigation (Break included)
    Session 8:  Introduction to Review of the Draft Environmental
               Impact Assessment
    Adjourn                                     '
Day 3
    Session 8:  Preparing and Communicating Reviewer Comments
               (Break and lunch included).
               Report Out
               Discussion of Public Comment
    Session 9:  Final Environmental Impact Assessment Review
               (Break included)
    Adjourn
    Session 10 Prepare a Record of Decision and Mitigation Plan
               (Break included)
    Session 11 Resources for a Reviewer
    Lunch
    Session 12 Country Specific Applications (Break included)
    Session    Wrap-up
    Adjourn
 8:30
 9:10
10:00
12:00
 1:00
 3:05
 5:00
 8:30

10:45

 1:20
 2:20
 4:00

 5:00
                                                                      8:30
 1:00
 2:00
 2:30

 5:00
 8:30

10:40
12:15
 1:30
 4:30
 5:00
                                                             Handout Session 1-2

-------

-------
                                            0

                         COURSE EVALUATION
   PRINCIPLES FOR ENVIRONMENTAL IMPACT ASSESSMENT REVIEW

Please evaluate the course based on your opinion of how useful the course was to you.

I.   COURSE CONTENT

Do the course materials and training style convey the following (rate each topic using a
    scale of 1 -5; l=poor and 5=excellent)?

About the job of Environmental
Impact Assessment Review
How to review for completeness
How to review for adequacy
How to review for significance
How to review for the integrity
of the process
How to influence decision-
making and project outcomes
How to ensure professionalism
and objectivity
How to review various sections
of a typical Environmental
Impact Assessment document
• Scoping
• Purposes and Need
• Alternatives
• Environmental Setting
• Impact Assessment
• Mitigation
Tools and techniques available
for conducting a review
v>v*Hv^'v^
-------
How would you rate each session of the course (use a scale of 1 - 5; l=poor and
     5=excellent)?
 Introduction and Welcome
 Reviewer's Role in the
 Environmental Impact
 Assessment Process
 Approaches to Overall and
 Scoping Review
 Review of Purpose and Need,
 and Alternatives
 Review and Description of the
 Environmental Setting
 Review of Environmental
 Imparts
 Review of Proposed Mitigation
 Preparing and
 Communicating Review
 Comments on a Draft
 Environmental Impact
 Assessment
 Reviewing a Final
 Environmental Impact
 Assessment for Response to
 Comments
 Preparing and Supporting a
 Record of Decision
 Preparing and Supporting a
 Mitigation Plan
 Resources for a Reviewer
 Country-Specific Applications
                                                                            Handout Session 1-3

-------
How would you rate the documents that the course was based upon (using a scale of
1 - 5; 1 = poor and 5 = excellent)?


Relevance to the
topic
Level of technical
information
Length of
document
Breadth of
applicability in
other
courses/countries
Appropriate for a
good learning
experience
Introduction of
interesting and
appropriate issues

1







2







3






*sNs$&
4






















n.   ADDITIONAL COMMENTS

•    Has the course given you greater confidence in performing reviews of environmental
     impact assessments?
•    Has the course provided you with more capacity for performing the job effectively?
                                                                  Handout Session 1-3

-------
     How will you apply the things you have learned in the course of you job?
     Do you have any additional comments on specific sessions?
     Was the course at the appropriate level for you?
     How much experience should a reviewer have to get the most out of this course?
     (please circle one and/or provide comments in the space below): A lot of experience.
     A moderate amount of experience. Little or no experience.
     Are there general environmental impact assessments topics that you believe would be
     relevant for future training courses?
     Are there specific case studies you would like to recommend for use in future courses?
•    Do you have any additional comments (e.g., which parts of the course did you like the
     best, which would you modify)?
                                                                    Handout Session 1-3

-------
                                   DEFEVTTIONS

ALTERNATIVES TO THE PROPOSED ACTION: Alternatives are different means of
     meeting the general purpose and need of a proposed action, including:
     •   not proceeding with the action
     •   carrying out the action in a different location or facility
     «   implementing a non-structural solution
     •       alternatives within an action, such as different designs or materials, are not
             usually considered alternatives

CUMULATIVE IMPACTS:  Cumulative impacts result from the incremental impact of the
     proposed action on a common resource when added to other impacts from past, present,
     and reasonably foreseeable future actions.  These  include the collective effects of
     individually minor actions over a period of time.

ENVIRONMENT IMPACT ASSESSMENT: Environmental impact assessment is
     the systematic, reproducible, and interdisciplinary consideration of the potential effects of
     •a proposed action and its reasonable alternatives on the physical, biological, cultural, and
     socioeconomic attributes of a particular geographical area.  It is a decision making process
     designed to help integrate economic,  social and environmental  concerns and to help to
     mitigate the adverse environmental impacts of activities related to projects, plans, programs
     or policies.  Involvement  of the public and interested parties is important to obtaining
     complete information on impacts and ensuring sound results.

IMPACT: A change in the  environment brought about by implementation of a project or
     alternative.

INITIAL  ENVIRONMENTAL IMPACT  ASSESSMENT:   Initial  Environmental  Impact
     Assessments consider the significance of environmental impacts in sufficient detail to make
     one of two determinations:
     1) no significant impact is expected; or
     2) significant impacts are expected.

MITIGATION: Mitigation  is a set of actions designed to reduce the undesirable impacts of a
     proposed action on the affected environment in one or more of five categories (in order of
     desirability):
     •   Avoidance
     •   Minimization
     •   Rectification
     •   Reduction
     •   Compensation

NO-ACTION ALTERNATIVE: The no-action alternative is the option of not engaging in the
     proposed action, project,  or program. It considers the  potential long-range outcomes
     resulting from no action.
                                                                     Handout Session 2-1

-------
PREFERRED ALTERNATIVE: The preferred alternative is that alternative that best meets the
     purpose and need of the action, project, or program while keeping environmental impacts
     to a practicable minimum.  Selection often considers three perspectives:
     1) engineering feasibility and requirements
     2) economic viability, and
     3) environmental soundness

PRIMARY IMPACT: A primary impact occurs at the same time and place as the action. It is
     usually associated with construction, operation, or maintenance of a facility or activity and
     are generally obvious and quantifiable..

PUBLIC PARTICIPATION:    Public participation is the involvement of citizens and citizens
     groups in the Environmental Impact Assessment process for the purpose of balancing any
     decision between policy makers and those who are affected by the policy.

PURPOSE AND NEED:  The purpose and need of a project is the justification for undertaking
     the action and may originate from legislation, administrative decisions, or private enterprise.
     It must be defined before the Environmental Impact Assessment process can proceed.

SCOPING: The early, open, and documented process of considering the issues and choices of
     alternatives to be examined in the Environmental Impact Assessment for a particular action,
     policy, or program. Scoping includes:
     •   determining the range  of issues to be addressed,
     »   determining the significance of these issues,
     •   eliminating issues that are not significant,
     •   securing participation of all technical experts and interested parties
     •   assigning responsibilities for Environmental Impact Assessment preparation and review,
     •   identifying other related planning decisions.

SCREENING:  The initial screening considers all possible  impacts to the action, project, or
     program.  It identifies whether significant impacts are expected or not.

SECONDARY IMPACT: Secondary impacts occur later in time, or at a different place from the
     initial action.  These impact are indirect or induced changes in the environment, population,
     economic growth, and land use.
SIGNIFICANT IMPACT:   A significant impact alters the properties of a natural or man-made
     resource in a way considered important. The importance is based on a relative change to an
     area, and the human perspective on the change.
                                                                      Handout Session 2-1

-------
REVIEWER'S ROLES
ELEMENT OF ENVIRONMENTAL
IMPACT ASSESSMENT PROCESS
1. Project initiation
• 2. Deciding whether to proceed with an
environmental impact assessment
3 . Review or preparation of an initial
environmental impact assessment
4. Scoping
5. Public participation
6. Preparation of a draft environmental
impact assessment:
Purpose and need documentation
Scoping
Identification of alternatives
Identification of technical and interested
parties
Describing the environmental setting
Assessment of impacts for alternatives
mitigation
7. Review and comment on a draft
environmental impact assessment
8. Identification of the preferred alternative
9. Review of a final environmental impact
assessment
10. Decision-making
11. Preparation of a record of decision
12. Review of a record of decision
13. Preparation of a mitigation plan
14. Review of a mitigation plan
1 5. Monitoring and follow up
Group Number
1
X
X
X



X








2



X


X








3




X

X








4





X
X
X
X






5









X
X
X



6












X
X
X
7


X



X








8







X
X






9



X
X

X








10






X







X
                              Handout Session 2-3

-------

-------










05
Is
_
0
PS
u.
12
C
H
Ex
tt
I
3
uC
C
£













£
.2
1
-fa*
i
JU
I
i
i
to
S





1
OH
1
i
s
{
13
0S
0,
=
3
B
0)
s
c
2
e
td

(X



i

1
1
ti

o
"o
c^






















































^J

































r4

































en

































^:

































^

































vb

































o"

































00

































<*

































o

































^


































-------

-------
           INSTRUCTIONS FOR OVERALL AND SCOPING REVIEW

       In this exercise, you will conduct a brief review of your assigned environmental impact
assessment document by: 1) scanning it for significant issues, and 2) reviewing how scoping was
done by the preparer of the environmental impact assessment.

Time Allotted

       You will have 45 minutes to complete this review exercise.  Spend the first 15 minutes
conducting your own individual overall and scoping review.  Spend the last 30 minutes in your
small group conducting a review of scoping.

Key Questions to Address/Tasks to Complete

Individual Review
       Develop a general sense of the whole document and identify the potentially significant
issues posed by the proposed project and adequacy of scoping. Try not to focus exclusively on
one section for all of the available time. Assume that scoping is a required element and that it
must be documented in the review.

Group Review
       As a group, review the scoping portion of the environmental impact assessment document.
Keep the Road Map discussed earlier in mind and focus on addressing issues raised by the Road
Map.  Ten minutes before the end of the exercise, summarize your findings on a blank flipchart.
Five minutes before the end of the exercise, elect a spokesperson to present your report.

The key questions your report should answer:

       *      What  do you think are the significant environmental issues posed by this proposed
             project?
       •      Was scoping addressed?
       •      Are the major issues identified? Which ones were ignored?
       •      Were  the issues you identified the same as the ones identified in the document?
       •      Are less significant issues identified?
       *      Who has been identified as an interested or affected party?
       •      Were there any obvious omissions in issues identified? In the parties identified?

       Each group will have THREE MINUTES to present its answers to the above questions,
so prepare to offer only your basic findings. If time remains at the end of your review process,
you may take a break until the class reconvenes.
                                                                      Handout Session 3-2

-------

-------
 INSTRUCTIONS FOR PURPOSE AND NEED AND ALTERNATIVES REVIEW

       In this exercise, your small group must review the purpose and need and alternatives
portions of the environmental impact assessment document assigned to you.

Time Allotted

       You will have a total of 45 minutes to conduct this review of the project description,
purpose and need, and alternatives.

Key Questions to Address/Tasks to Complete

Individual Review
       Your small group will need to determine how much time you will need as individuals to
review the document, and you will each need to use that time to individually review and analyze
the document. You should spend no more than 25 minutes on your individual review to allow
time for group consensus building and report preparation.

Group Review
       Your small group will need to convene and discuss your observations and questions.
Your group will also need to prepare a group report on major points you want to make about
your review. Ten minutes before the end of the exercise, summarize your findings on a flipchart.
Five minutes before the end of the exercise, elect a spokesperson to present your report.

The key questions your report should answer are whether the environmental impact assessment
document:

       •      Describes the purpose and need of the proposed project
       •      Demonstrates how purpose and need would be met by the proposed project
       •      Adequately describes the proposed project
       •      Considers the full range of alternatives to meet purpose and need (no action;
             alternative sites, designs, controls; structural vs non-structural; reallocation of
             social costs and benefits; reasonable, feasible; reflective of the range of choices;
             meet the purpose and need of the proposed project
       •      Preferred alternative satisfies purpose and need better than alternatives with less
             environmental impact.

       Each group will have THREE MINUTES to present its findings on the above questions,
so prepare to offer only your basic findings.
                                                                      Handout Session 4-1

-------

-------
                 LOCAL INFORMATION AND SOURCES
Environment Type
Information Sources
Data Gaps
How to Fill the Gap
                                                        Handout Session 5-1

-------

-------
           ENVIRONMENTAL SETTING - DOCUMENT EXCERPTS


As a reviewer, are you satisfied with these statements?  If not, what questions are raised by each

     statement?   What additional information, if  any,  would you  expect to see  in an

     environmental impact assessment to support these statements?
                           ASSESSMENT BOUNDARY

  'The Sanco Municipal boundary closest to the proposed wastewater treatment facility
                   was utilized to define the assessment area."
                              INFRASTRUCTURE

  'The Town of Binghamton's solid waste landfill has been recently constructed and is
                               underutilized."
                             FLORA AND FAUNA

  "Flora and fauna along the route of the proposed Blue Ridge Highway are thought to
           be generally characteristic of the Southeastern United States."
                            ENDANGERED SPECIES

    'No endangered species has been observed at the proposed site in the past three
                                  years."
                              DEMOGRAPHICS

            "Only 10 percent of the population use the river for fishing"


                             SOCIO-ECONOMICS

  'The local economy in Western Alberta is entirely dependent on agriculture, mining,
                                and tourism."
                                                                  Handout Session 5-2

-------

-------
          INSTRUCTIONS FOR ENVIRONMENTAL SETTING REVIEW
       In this exercise, you will review the description of the environmental setting portion of
your assigned environmental impact assessment case study document.

Time Allotted

       You will have a total of 50 minutes to conduct this review of the description of the
environmental setting.

Key Questions to Address/Tasks to Complete

       Two of the four case study review groups will receive a checklist to review the description
of the environmental setting. If you received this checklist, use it as much as possible to guide
your review.  Whether or not you received the checklist, feel free to use any of the tools and
techniques that have been described during this course.

Individual Review
       Your small group will need to determine how much time you will need as individuals to
review the document, and you will each need to use that time to individually review and analyze
the document.  You should spend no more than thirty minutes on your individual review to allow
time for group consensus building and report preparation.

Group Review
       Your small group will need to convene to discuss your observations and questions. Your
group will also need to prepare a group report on major points you want to make about your
review of this element.  Ten minutes before the end of the exercise, you should summarize your
findings on a flipchart.  Five minutes before the end of the exercise, you should elect a
spokesperson to present your report.

       In preparing your report, focus on evaluating whether the environmental  setting portion of
your assigned environmental impact assessment document met the criteria in the  Road Map for
Environmental Setting Review. Each group will have THREE MINUTES to present its report,
so prepare to offer only your basic findings.
                                                                     Handout Session 5-3

-------

-------
Environmental Setting Checklist
Issue and Text Reference
DESCRIPTION OF THE ENVIRONMENTAL
SETTING
1 . Region of Concern defined, including boundary
areas (p. 4-12)
2. Physical-Chemical Environment (p. 4-1 2)
a. Air Resources (p. 4-1 3)
1) meteorological data (e.g., temperature,
wind)
2) ambient air quality (e.g., particulates,
ozone)
3) stationary sources of emissions (e.g.,
power plants)
4) mobile sources of emissions (e.g., cars and
trucks)
b. Water Resources (p. 4-1 4)
Surface Water:
1 ) location and type (e.g.,estuaries, streams,
lakes, and their position relative to the
site)
2) water quality information (e.g. , dissolved
oxygen, temperature, nutrients)
3) existing pollutant sources (location and
amount of discharges)
4) future uses
5) discussion of flooding events
Ground Water:
6) description of key factors (e.g. , depth to
water table, overlying soils, geologic
features)
7) water quality information (e.g., pH,
solids)
c. Soils and Geology (p. 4-16)
1) topography
2) soil structure
3) ground water movement
4) erosion potential
5) subsidence
6) seismic activity (e.g., proximity to faults,
history of earthquakes and volcanic
eruptions)
7) mineral resources (e.g., locations of
deposits, types and quantities, ownership
of mining rights)
2. Biological Conditions
N/A

























Adequately
Covered

























' Not
Adequately
Covered

























Comments























-

                                            Handout Session 5-4

-------
-. <
Issue and Text Reference
a. Wildlife and Vegetation (p. 4-1 8)
1 ) description and listing of aquatic,
wetland, and terrestrial flora and fauna
(e.g., species lists, abundances)
2) description and listing of native species of
wildlife and vegetation present
3) description and listing of particularly
invasive exotic species of wildlife and
vegetation
4) description and listing of rare and
threatened species
b. Community and Habitat Characterization
(p. 4-22)
1 ) maps and descriptions of the aquatic,
wetland, and terrestrial communities
found in and around the project site
c. Ecologically Significant Features (p. 4-24)
1 ) support of broader ecosystems by the
project site (e.g., if located along a flyway
or other biological corridor)
2) important ecological functions of the
project site (e.g., nutrient source through
flooding, stormwater retention)
3) characterization of relevant disturbance
regimes, natural and project-induced (e.g.,
floods, fire, potential impact of logging)
4) description of hydrologic processes (e.g.,
ground and surface water flows and
durations)
5) description of important biotic
interactions (e.g., interdependence of
plants and animals at the site and with
other sites)
4. Waste Management and Pollution Prevention
(p- 4-27)
a. Locations of expected waste disposal or
discharge
b. Description of waste management techniques
(e.g., treatment, storage, transport, recycling)
c. Projected waste characteristics (e.g., types,
quantities, toxicity)
5. Socioeconomic Environment (p. 4-28)
a. Land Use (p. 4-29)
1 ) description of present and historic land
use
2) map of present and historic land use
b. Population and Housing (p. 4-29)
N/A






















Adequately
Covered






















Not
Adequately
Covered






















Comments






















Handout Session 5-4

-------
Issue and Text Reference
1 ) demographic information (e.g., average
household size, average age, age/sex
distributions, ethnic composition, and
community cohesion)
c. Economic Activity (p. 4-30)
1 ) description of present economic activity
(e.g., number and type of businesses,
annual revenues, ownership patterns)
2) description of unique features of business
community (e.g., high seasonality of trade,
nigh outflow of profit, declining of trade,
or downtown revilalization)
3) consideration of interplay among
economic activity, capacity of public
services, and fiscal ability of community
to respond to capacity needs
d. Community Services and Public Finance
(p. 4-31)
1 ) description of existing public facilities
and services within vicinity of project,
including existing level of use and
remaining capacity to accommodate
growth
e. Transportation (p. 4-32)
1 ) description of all relevant forms of
transportation for facility
2) current traffic volumes
3) current traffic capacity
4) provision of public transportation
5) assessment of the adequacy of the systems
for meeting peak demands during
construction and operation
f. Health and Safety (p. 4-32)
1 ) description of present health and safety
issues (e.g., statistics on industrial
accidents, emissions data from prior and
existing facilities, present levels of noise)
2) identification of special populations or
areas more likely to be exposed to adverse
impacts
6. Cultural Resources (p. 4-3 3)
a. Archaeological sites in relation to the project
b. Paleontological sites in relation to the project
c. Historic sites in relation to the project
d. Educational, religious, scientific, or cultural
sites in relation to the project
N/A





















Adequately
Covered





















Not
Adequately
Covered





















Comments





















Handout Session 5-4

-------

-------
     ENVIRONMENTAL IMPACT EVALUATION DOCUMENT EXCERPTS


As a reviewer are you satisfied with these statements? If not, what questions are raised by

     each statement? What additional information, if any, would you expect to see in an

     environmental impact assessment to support these statements?
                            PREDICTIVE MODEL

  'One year of historical water quality data, from an existing U.S. Geological Survey
    monitoring station, was entered into the Persistence model.  The results of the
    application of the model indicate that the water body adjacent to the proposed
      shopping center would not be affected by its construction and operation."
                      EXTRAPOLATION/TREND ANALYSIS

  •"The population of Sanco County has grown at an annual rate of approximately 5
 percent over the past 10 years and is expected to continue to grow at mis rate for the
 next 10 to 15 years. The County's current community service plans are sufficient to
                          accommodate this growth. "
                              EXPERT OPINION

 •"A recognized transportation expert reviewed the results of a 1993 traffic study and
  determined that there would be no impact from the proposed soccer stadium on the
                        flow of traffic within the city."

                              SEGMENTATION

  • "No potentially significant impacts that require mitigation have been identified for
                    operation of the proposed power plant."
                                                                  Handout Session 6-1

-------

-------
Environmental Impact Checklist
Issue and Text Reference
ASSESSMENT OF POTENTIAL ENVIRONMENTAL
IMPACTS
The Environmental Impact Assessment discusses primary,
secondary, and cumulative impacts during all stages,
including initial site preparation and construction; facility
operation, and post-facility or site closure for the
following (p. 4-36):
1 , Pollutant Generation, Transport, and Receptors
(p. 4-40)
a. Air Resources (p. 4-40)
1 ) identification of emission sources and
project emission rates and comparison to
national, state, and local standards and
limitations
2) comparison of predicted atmospheric
levels with national, state, or local
ambient levels
3) description of stack emissions during
operation and maintenance activities and
comparison with existing national, state,
and local standards
4) identification of best mitigation measures
to avoid or minimize adverse impacts
b. Water Resources (p. 4-42)
1 ) address potential for water quality to be
degraded by various factors
2) prediction of pollutant concentrations in
water bodies and comparison with
existing national, state, and local water
quality standards and criteria
3) identification of best mitigation measures
to avoid or minimize adverse impacts
c. Geological Resources (p. 4-45)
1 ) determination of potential soil loss and
mitigation activities
2) identification of potential contamination
sources and mitigation measures
d. Biological Resources (p. 4-46)
1 ) consideration of potential losses of
biological resources within site
boundaries
2) description of effluent and emission
concentrations and their potential effects
to vegetation and wildlife
3) discussion of bioaccumulative effects from
facility emissions and discharges
N/A



















Adequately
Covered



















Not
Adequately
Covered



















Comments



















                                          Handout Session 6-2

-------
Issue and Text Reference
4) identification of best mitigation measures
to avoid or minimize adverse impacts
2. Habitat Alteration (p. 4-46)
a. Biological Resources (p. 4-47}
1 ) address potential for construction and site
preparation activities to alter critical
habitats for wildlife
2) consideration of potential for secondary
changes in habitats following construction
and site preparation activities
3) assessment of possible permanent loss or
displacement of vegetation habitat due to
operation
4) identification of changes in local species
composition, diversity, and abundances
resulting from loss of specific habitats
5) identification of best mitigation measures
to avoid or minimize adverse impacts
3. Waste Management and Pollution Prevention
(p. 4-52)
a. description of facility waste management plan
with procedures for treatment, handling, and
disposal
b. discussion of projected facility waste
characteristics
c. identification of best mitigation measures to
avoid or minimize adverse impacts
4, Socioeconomic Impacts (p. 4-53)
a. Land Use (p. 4-54)
1 ) identification of the existing or planned
land use areas lost due to site preparation
and construction activities
2) determination of conflicting zoning
requirements and land uses with site
preparation and construction activities
3) description of anticipated changes in near
by land use as a result of the facility and
evaluation of conflicts that could arise
during operations
4) identification of best mitigation measures
to avoid or minimize adverse impacts
b. Economic Activity (p. 4-57)
1 ) address changes in employment patterns
2) address ability of available labor pool to
meet project-related employment needs
3) identification of economic multipliers
used in analysis and their source
N/A






















Adequately
Covered






















Not
Adequately
Covered






















Comments









-












Handout Session 6-2

-------
Issue and Text Reference
4) discussion of potential change in overall
economic activity in region
5) identification of best mitigation measures
to avoid or minimize adverse impacts
c. Population and Housing (p, 4-58)
1 ) address the relationship between
employment increases and population
in-migration
2) identification of deficiencies in available
housing for the potential increased
workforce and their families
3 ) identification of best mitigation measures
to avoid or minimize adverse impacts
d. Community Services and Public Finance
(p. 4-59)
1 ) identification of deficiencies in
community services and infrastructure
during project construction and operation
2) identification of shortfalls in
transportation capacity due to either
primary or secondary impacts of the
project
3) identification of best mitigation measures
to avoid or minimize adverse impacts
e. Transportation (p. 4-
61)
1 ) assessment of proposed project's
consistency with local and/or regional
transportation plans
2) evaluation of changes in LOS
resulting from the proposed project
and alternatives
3) evaluation of the effect of heavy vehicle
traffic on affected pavement and bridges
4) description of mitigation measures to
offset adverse impacts to structural
integrity and public safety
f. Health and Safety (p. 4-62)
1 ) evaluation of whether construction,
operation, and maintenance activities
present health and safety hazards to
humans working or living at or near the
project site
2) discussion of potential effects of facility
noise levels on workers, local
communities, and local flora and fauna
3) analysis of potential long-term
contaminant bioaccumulation within the
food chain
N/Aj



















Adequately
Covered



















Not
Adequately
Covered



















- Comments



















Handout Session 6-2

-------
Issue and Text Reference
4) identification of best mitigation measures
to avoid or minimize adverse impacts
g. Environmental Equity (p. 4-63)
1 ) determination of the equity of changes in
employment patterns attributable to site
preparation and construction activities
2) determination of the equity of community
structure changes caused by project
construction and operation
3) identification of best mitigation measures
to avoid or minimize adverse impacts
5. Cultural Resources (p. 4-63)
a. identification of any historical or cultural
resources in close proximity to the site
following correspondence with appropriate
authorities
b. discussion of mitigation measures necessary to
preserve items of archaeological, historical, or
cultural interest
c. determination of the extent to which
construction, operation, and maintenance
activities disrupt the aesthetic or sensory
attributes of the site
d. determination of whether the facility
components are designed with consideration
given to human factors
MITIGATION MEASURES
1. Mitigation Measures (p. 4-68)
a. description of mitigation activities for all
significant impacts to both the natural and
human (socioeconomic) environments
b. description of mitigation measures with
adequate information to evaluate environmental
consequences and residual impacts
c. identification of best mitigation measures to
avoid or minimize potential impacts during all
stages of the project, including siting and
design, facility operation, and post facility
closure.
d. support of the following types of mitigation
measures, in the following decreasing order of
preference:
Avoidance or prevention
Minimization
Reduction or elimination over time
Correction
Compensation.
e. implementation plan (schedule) and criteria for
performance for all mitigation measures.
f. responsible entity assigned to carrying out each
mitigation measure.
N/A


















Adequately
Covered


















Not
'Adequately
Covered


















Comments


















Handout Session 6-2

-------
Issue and Teit Reference
g. measures are socially and culturally acceptable.
h. adequate financial and non-financial resources
to implement the measures.
'N/A


Adequately
Covered


Not "
Adequately
Covered


Comments


Handout Session 6-2

-------

-------
        INSTRUCTIONS FOR REVIEW OF IMPACTS IN CASE STUDIES
       In this exercise, you will review your assigned environmental impact assessment document
for discussion of its assessment of environmental impacts.  You will do this both individually and
as a group.

Time Allotted

       You will have 80 minutes to complete your review.  You will also have 60 minutes for
lunch.  Each group is responsible for scheduling lunch within the two hours and 20 minutes
available.

Key Questions to Address/Tasks to Complete

Individual Review
       Your small group will need to determine how much time you will need as individuals to
review the document, and you will each need to use that time to individually review and analyze
the document.  You should spend no more than one hour on your individual review to allow time
for group consensus building and report preparation.

Group Review
       Your small group will need to convene and discuss your observations and questions.
Your group will also need to prepare a group report on major points you want to make about
your review of this element. Ten minutes before the end of the exercise, you should summarize
your findings on a flipchart. Five minutes before the end of the exercise, you should elect a
spokesperson to present your report.

       You must factor in time for lunch. We recommend that you individually review the
material before lunch and begin your discussions. Then, arrange a specific time for your group to
reconvene. Be sure to leave sufficient time after lunch to complete your discussions and allow for
report preparation.

       During your review and when preparing your group report, focus on evaluating whether
the environmental impacts portion of your assigned environmental impact assessment  document
met the criteria in the Road Map for Environmental Impact Review. Each group will  have
THREE MINUTES to present its report, so prepare to offer only your basic findings.
                                                                     Handout Session 6-3

-------

-------
            PROPOSED MITIGATION - DOCUMENT EXCERPTS


As a reviewer, are you satisfied with these statements? If not, what questions are raised by each

          statement? What additional information, if any, would you expect to see in an

                environmental impact assessment to support these statements?
                              POLLUTION CONTROL

     •"Paniculate matter emissions from the proposed coal-fired power plant will be
  controlled through the installation of control technologies in compliance with the city's
                               emission standards."

                                FLORA AND FAUNA

    • "A two acre wetland will be constructed adjacent to the stadium's parking area to
           compensate for wetland habitat being drained during construction."

   'At the completion of mining activities at the Copper Incorporated mine, the disturbed
                 area will be regarded and seeded to reduce erosion."

                                SOCIO-ECONOMIC

    • "The local automobile factory has announced plans to add a third shift which will
  compensate for local employment reductions in Sanco County as a result of the closing
      of four small businesses located in the right-of-way for the proposed highway
                                   expansion."
                                                                  Handout Session 7-1

-------
4

-------
          INSTRUCTIONS FOR REVIEW OF PROPOSED MITIGATION
       In this exercise, you will review your assigned environmental impact assessment document
for discussion of proposed mitigation. You will do this both individually and as a group.

Time Allotted

       You will have a total of 45 minutes to complete your review of this element of your
assigned environmental impact assessment case study document. If your group finishes before 45
minutes have passed, you make take a break until all groups reconvene for group presentations.

Key Questions to Address/Tasks to Complete

Individual Review
       Your small group will need to determine how much time you will need as individuals to
review the document, and you will each need to use that time to individually review and analyze
the document.  You should spend no more than fifteen minutes on your individual review to allow
time for group consensus building and report preparation.

Group Review
       Your small group will need to convene and discuss your observations and questions.
Your group will also need to prepare a group report on major points you want to make about
your review of this element.  Ten minutes before the end of the exercise, you should summarize
your findings on a flipchart. Five minutes before the end of the exercise, you should elect a
spokesperson to present your report.

       In conducting your review, assume the environmental impact assessment is required to
identify mitigation options for each alternative.  Refer to the Road Map we have created to keep
your review focused and effective, as well as the tools and techniques we presented in Session 3.
Also, feel free to use the World Bank tables, or other resources available in the Resource Manual.

       Each group will have THREE MINUTES to present its answers to the above questions,
so prepare to offer only your basic findings.  If time remains at the end of your review process,
you may take a break until the class reconvenes.
                                                                      Handout Session 7-2

-------

-------
         INSTRUCTIONS FOR MANAGEMENT PLAN DEVELOPMENT
       In this exercise, you will create a management plan for integrated review of the entire
environmental impact assessment case study document you have been assigned.

Time Allotted

       You will have 45 minutes to finish drafting your management plan.  All of this time will be
spent in group discussion.

Key Questions to Address/Tasks to Complete

       In this exercise, you must develop a management plan for integrated review of the entire
draft environmental impact assessment document assigned to your group. This plan must achieve
the following things.

       •      Assign specific review roles to all group members, including the role of the lead
             reviewer and associate reviewers; and

       •      Establish a process to integrate the comments you will generate on the draft
             document (i.e., subject matter integration).

       Your group will need to determine how you will:

       •      Use the maximum amount of the resources at your disposal  (e.g., group members,
             past review comments, Resource Manual information, Student Text);

       •      Consider the past comments you have made on various parts of the draft
             document; and

       •      Consider any new comments that are identified, particularly based on a new
             perspective of the entire document.

       Your group will be expected to implement its management plan tomorrow morning. The
result of implementation of your management plan will need to be a comment letter on the draft
environmental impact assessment document you have been assigned.
                                                                    Handout Session 8-1

-------

-------
        ROAD MAP FOR OVERALL
ENVIRONMENTAL IMPACT ASSESSMENT
            DOCUMENT REVIEW

Review Table of Contents and Executive Summary

Scan and read the document several times

Take notes, write down questions

Go through key environmental impact assessment elements
-    Purpose and Need, Alternatives, Environmental Setting, Impact,
     Mitigation

Use checklists where appropriate

Review the logic and consistency of the document

Use a systematic approach to identify areas where the assessment is:
     Incomplete, inadequate
-    Significance unsupported/unclear/ignored
     Lacks integration

Identify and adopt perspectives of all interested and affected parties

Compare document to other environmental impact assessments

Determine whether the document supports decision-making
                                              Handout Session 8-2

-------
    ROAD MAP FOR SCOPING REVIEW

Scoping was conducted and documented

Potentially significant issues are identified for natural and human
environments

Insignificant issues identified and their dismissal justified

Identified and considered the views of all interested and affected
parties

Sufficient detail provided to define the spatial and temporal scope

Adequate geographic area considered for the scope

Omissions are not related to significant issues

Key issues are brought into focus
                                                  Handout Session 8-2

-------
 TOOLS AND TECHNIQUES FOR ENVIRONMENTAL
           IMPACT ASSESSMENT REVIEW

•    Information on legal and institutional requirements, policy, and
     guidance

•    Guidelines

•    Road Maps

•    Checklists

•    Student texts

•    Library

•    Field reconnaissance

•    Analytic and predictive models

•    GIS maps and overlays

•    Environmental  impact assessments for similar projects, geographic
     area, etc,

•    Consultation by colleagues/outsiders/experts/academia

•    Reviewing other reviewer/public comments
                                                  Handout Session 8-2

-------
ROAD MAP FOR PURPOSE AND NEED AND
           ALTERNATIVES REVIEW

Describes the purpose and need of the proposed project

Demonstrates how the purpose and need would be met by the proposed
project

Adequately describes the proposed project
      Maps project site, surrounding land use, and natural features
      Who and what would benefit; who and what would be affected
      Phases; site preparation, construction, operation, and closure
      Time frames, including when proposed project begins and ends

Considers the full range of alternatives to meet the purpose and need
      No action
      Alternative sites, designs, controls
      Structural vs. non-structural
      Reallocation of social costs and benefits
      Reasonable, feasible
      Reflective of the range of choices
      Meet the purpose and need of the proposed project

Preferred alternative satisfies the purpose and need better than
alternatives with less environmental impact
                                                 Handout Session 8-2

-------
ROAD MAP FOR ENVIRONMENTAL SETTING REVIEW

  •    All relevant types of natural and human environmental issues are
       addressed

  •    Affected area or community is adequately and accurately defined

  •    Adequately map impact area and surrounding features
                                                     rt
  •    Baseline is established to measure impact

  •    Appropriate information and data documented and used appropriately

  •    Information links back to project description, purpose and need,
       alternatives

  *    Levels of detail are appropriate to significance

  •    Information and data is of acceptable quality and relevance

  •    Section is internally consistent
                                                        Handout Session 8-2

-------
ROAD MAP FOR ENVIRONMENTAL IMPACT REVIEW

 •     All natural and human (socioeconomic) environmental impacts are
       identified

 •     Types of impacts include primary, secondary, and cumulative

 •     Detail on impacts is balanced among reasonable and feasible
       alternatives

 •     Both beneficial and adverse impacts are identified

 •     Potential impacts are identified for all phases of the proposed project

 •     Models, experts, and criteria used to project the significance of impacts
       are valid for appropriate circumstances

 •     Data, information and key assumptions are representative, accurate,
       and current

 •     Appropriate criteria are used to characterize significance
                                                        Handout Session 8-2

-------
  ROAD MAP FOR MITIGATION REVIEW
Specific mitigation measures are proposed

All significant adverse impacts are addressed by the mitigation plan

Measures are proposed for:
      All types of impacts
      All phases of the proposed project
      All environment types

Preferred mitigation measures at the top of the mitigation type
hierarchy are considered
Mitigation measures are described in sufficient detail relative to the
significance of impact

Mitigation measures are:
      Technically and financially feasible with adequate financial and
      non-financial resources to implement the measures
      Socially and culturally acceptable

Implementation plans include schedules and interim milestones, and
timing is consistent with other factors presented in the assessment of
impact

Responsible parties are identified and committed to implementation
                                                  Handout Session 8-2

-------
ROAD MAP FOR DRAFT ENVIRONMENTAL IMPACT
                ASSESSMENT REVIEW

  Establish a management approach:
       Establish lead reviewer
       Assign roles
       Establish a schedule
       Conduct review

  Consolidate reviewers' comments:
       Identify most significant issues
       Determine the significance of each comment
       Establish common threads
       Resolve any discrepancies

  Draft a comment letter:
       Maintain neutrality, objectivity and professionalism
       Provide clear and concise comments

  Anticipate and respond to public comment
                                                     Handout Session 8-2

-------
ROAD MAP FOR THE COMMUNICATION LETTER

State bottom line including major recommendations up front and clearly

Describe proposed project context

If the purpose and need of the proposed project is in question, develop the
link to the environmental concerns

Distinguish what is mandatory, what is significant

Provide a description of the substantive and/or procedural concerns

Demonstrate sensitivity to interests and affected community

Provide recommendations for addressing the concerns               	
                                                    Handout Session 8-2

-------
                ROAD MAP FOR FINAL
ENVIRONMENTAL IMPACT ASSESSMENT REVIEW

  Establish a management approach

 Determine if basic assumptions and information are the same for draft and
 final documents

 Assess impacts of any changes on alternatives, impacts and proposed
 mitigation

 Verify that comments were acknowledged and addressed

 Review the relationship and consistency among responses to individual
 comments

 Consolidate comments and prepare the final comment letter

 Determine whether responses change fundamental reviewer findings:
       Acceptability of environmental impact
       Needed mitigation
       Adequacy of environmental impact assessment document and process
       Who needs to be involved and consulted

 Decide actions to increase chance of correcting remaining deficiencies

 Anticipate use by decision maker

 Anticipate use to establish mitigation requirements

 If appropriate, prepare final comment letter
                                                     Handout Session 8*2

-------
      INSTRUCTIONS FOR COMMUNICATION LETTER DEVELOPMENT

       In this exercise, you will draft a communication letter on the entire draft environmental
impact assessment case study document you have been assigned.

Time Allotted

       You will have 3.5 hours to prepare your reviewer comments.  This period will be followed
by a one-hour lunch. You will need to be back 4.5 hours from now to report out on your
comment letters.

Key Questions to Address/Tasks to Complete

       In the previous exercise, you created a management plan for conducting an integrated
review of the entire case study environmental impact assessment document assigned to your
group. In this exercise, you will carry out your management plan, conduct the review, and
prepare a comment letter discussing the findings from your review.

       You must actually write out and be prepared to read the introductory paragraph of your
comment letter (you need not write nor  read an entire letter). Your introductory paragraph
should summarize your overall evaluation of the document. In addition, on a blank flip chart,
record specific recommendations that you would like to see carried out by the project proponent,
and be prepared to present them to the class.

       During your group report, your group should be prepared to discuss:

       •      Your management approach, assigned roles, and the strengths and weaknesses of
             your management approach;
       •      Any new issues you identified conducting the review this time;
       •      The types of comments you deemed significant, whether there were different
             opinions in your group, and why;
       •      The types of issues you had with the integrity of the document and analysis;
       •      The types of mandatory actions you considered;
       •      What became clearer when you read the document as a whole instead of in parts;
             and
       •      How the different sections related.

       You will have a total of 15 minutes to present your comment letter, findings, and answer
questions.
                                                                    Handout Session 8-3

-------

-------
ROAD MAP FOR RECORD OF DECISION PREPARATION

   Re-state the purpose and need

   Support preferred alternative and justify
        Meets purpose and need
        Either preferred environmentally or meets purpose and need
        better than other alternatives
        Meets legal requirements

   Demonstrate all potentially adverse impacts from the selected
   alternative were fully considered

   Demonstrate benefits of proposed action outweigh adverse
   impacts

   Demonstrate that implementation of the project will be
   environmentally acceptable

   Clearly State mitigation and continuing responsibilities
                                                  Handout Session 10-1

-------

-------
ROAD MAP FOR MITIGATION PLAN PREPARATION

 Proposes specific mitigation measures:
       All (significant) adverse impacts
       All primary, secondary, cumulative adverse environmental
       impacts
       All phases of the project
       All relevant environment types (natural and human)

 Where appropriate, proposes mitigation measures most desirable
 in hierarchy

 Provides sufficient detail relative to the significance of each
 environmental impact

 Includes technically and financially feasible measures
       Financial/other resources
       Socially and culturally acceptable

 Includes implementation plans, schedules and interim milestones,
 and  timing consistent with other factors

 Identifies responsible parties committed to implement the plan
                                                 Handout Session 10-2

-------

-------
                  MITIGATION PLAN
ACTION:
SCHEDULE:
COSTS/BENEFITS:   FEASIBILITY
                                            Handout Session 10-4

-------
I

-------
         MITIGATION FOLLOW-UP ACTION PLAN
ACTION
WHO
WHEN
SPECIAL RESOURCES
                                            Handout Session 10-4

-------

-------
Principles of Environmental Impact Assessment Review
                                            Facilitator Manual
 Environmental Impact Assessment Document Title
 Date Prepared
 Document Prepared By
 Document Reviewed By (Agency Name)
                           Chronology of Key Events
 (include all key events identified on the Environmental Impact Assessment Process Flow Chart
            and any other events that shaped the development of this assessment)
   DATE
KEY EVENTS
                                      A-15
                                                   July 1998

-------

-------
Principles of Environmental Impact Assessment Review
                             Facilitator Manual
  Environmental Impact Assessment Document Title
  Date Prepared
  Document Prepared By
  Document Reviewed By (Agency Name)
                         List of all Relevant Documents
  (at a minimum, the list should include the Draft Environmental Impact Assessment, comment
    letter, Final Environmental Impact Assessment, Record of Decision, and Mitigation Plan)
Date
Title
Author
                                       A-16