Listing of
Particle Sizing Test Reports
September 1988 Draft
-------
Listing of
Particle Sizing Test Reports
September 1988 Draft
Prepared by:
Marjorie J. Fitzpatrick
JACA Corp.
550 Pinetown Road
Fort Washington. PA 19034
Prepared for:
U.S. Environmental Protection Agency
Region V
Ch 1 cago. I L
Contract 68-02-4462. Task 49
September 30. 1988
-------
This report was submitted in partial fulfillment of Contract No.
68-02-4462, Task 49, by JACA Corporation under the sponsorship of the U.S.
Environmental Protection Agency. The contents of this report are repro-
duced herein as received from the contractor. Any mention of process
control techniques or patented products does not constitute endorsement by
the author or the U.S. Environmental Protection Agency.
Inclusion of a
test report in this document does not indicate acceptance of the test or
testing method by the author or the U.S. Environmental Protection Agency.
-i-
-------
INTRODUCTION
Under EPA Contract Number 68-02-4462, Task 49, JACA Corp. summarized
and catalogued particle sizing reports for tests conducted at numerous
industrial processes. This document is a summary listing of reports that
JACA gathered as of September 1988. To date JACA has gathered over 500
reports or report summaries representing over 4,400 individual test runs.
Information in the particle sizing test reports was summarized and
entered into a user-friendly database which was also developed under
Contract Number 68-02-4462, Task 49. Detailed information on the database
and the information in the database appears in a separate document
entitled, "User's Guide for PM10 Database" also prepared by JACA Corp.
Sources of Data
Particle sizing test reports were gathered from the following
sources:
o
Information in EPA's Fine Particle Emission Inventory System
(FPEIS). FPEIS was a database developed by EPA to store and
analyze detailed results of particle sizing tests. The database
has been removed from EPA's computer system. However, prior to
the removal of FPEIS, JACA received printouts of all the infor-
mation in the database.
o
Test reports in the Iron and Steel Stack Test library. This
library contains approximately 800 test reports gathered by JACA
Corp. under previous EPA contracts. JACA reviewed the library
and extracted particle sizing test reports.
-1-
-------
o
Review of files at several EPA Regional Offices. JACA reviewed
technical files and spoke with case engineers at EPA Regions
II I, V, IX.
o
Preliminary Literature Review. JACA conducted a preliminary
review of published reports and papers for particle sizing data.
Amount of Data Available
Information from the particle sizing reports was summarized and
entered into a user-friendly database. The reports were then catalogued
and stored in library. Table 1 shows the number of reports and test runs
in the database/library system by industry category. Table 2 shows the
number of available test reports by state and EPA region.
Discussion of Listing
A listing of test reports available at JACA follows. The reports are
divided by industry into the following categories:
Agrichemical Industry
Chemical Process Industry
External Combustion Sources
Fabricated Metal Products
Ferrous Metals Industry
Food & Agricultural Industry
Internal Combustion Sources
Iron & Steel
Mineral' Products Industry
Nonferrous Metals Industry
Petroleum Industry
Solid Waste Disposal
Storage Battery Production
Wood Products Industry
Each industry section is separated by colored paper.
-2-
-------
Table 1
Summary of Number of Particle Sizing Test Reports
and Test Runs by Industry
Available at JACA Corp.
No. of
No. of Particle No. of
Test Sizing Mass
Industry Reports Test Runs Test Runs
Agrichemical Industry 18 80 53
Chemical Process Industry 6 28 7
External Combustion Sources 225 1540 440
Fabricated Metal Products 1 2 0
Ferrous Metals Industry 12 208 31
Food & Agricultural Industry 12 39 8
Internal Combustion Sources 3 6 0
Iron & Steel 82 419 128
Mineral Products Industry 77 502 379
Nonferrous Metals Industry 37 189 88
Petroleum Industry 4 14 2
Solid Waste Disposal 13 56 24
Storage Battery Production 3 14 0
Wood Products Industry 18 116 28
Total Number of Reports/Runs 511 3213 1188
-3-
-------
Table 2
Summary of Number of Particle Sizing
Test Reports by State and EPa
Region Available at JACA Corp.
No. of No. of
Test Test
State Reports State Reports
EPA Region I EPA Region V
CT 0 IL 16
ME 0 IN 25
MA 2 MI 26
NH 0 MN 16
RI 0 OH 50
VT 0 WI 6
*Total Region I 2 *Total Region V 139
EPA Region II EPA Region VI
NJ 2 AR 9
NY 5 LA 0
NM 3
*Total Regi on II 7 OK 2
TX 12
EPA Regi on I II
*Total Region VI 26
DE 3
DC 0 EPA Regi on VII
MD 2
PA 45 IA 1
WV 3 KS 2
VA 1 MO 8
NE 2
*Total Region
III 54 *Total Region VII 13
EPA Region IV EPA Region VIII
AL 9 CO 9
FL 3 MT 5
GA 9 ND 1
KY 5 SD 1
MS 0 UT 0
NC 12 WY 6
SC 6
TN 8 *Total Region VIII 22
*Total Region IV 52
(continued) .
-4-
-------
Table 2
(Continued)
No. of No. of
Test Test
State Reports State Reports
EPA Region IX EPA Region X
AZ 4 WA 14
CA 63 OR 1
HI 5 ID 1
NV 3 AK 0
*Total Region IX 75 *Total Region X 16
Other
-
Foreign 5
Unknown State 100
-5-
-------
Questions/Suggestions
JACA reviewed a large number of test reports in a relatively short
time period.
If you see any errors or inconsistencies, have suggestions or
questions, or would like to obtain a copy of a test report or submit addi-
tional data contact:
Marjorie Fitzpatrick
JACA Corp.
550 Pinetown Road
Fort Washington, PA 19034
(215) 643-5466
Test reports are available to EPA and EPA contractors, and others at
the discretion of the EPA Work Assignment Manager, Ed Wojciechowski, in EPA
Region V. Mr. Wojciechowski can be reached at:
EPA Region V
230 S. Dearborn Street
Chicago, IL 60604
(312)-886-6785
-6-
-------
LISTING OF TEST REPORTS
-------
AGRICHEMICAL INDUSTRY
-------
09/30/88 LIST OF PARTICLE SIZE TEST REPORTS PAGE 1
AGRICHEHICAL INDUSTRY
NAME/LOCATION TEST BY REPORT TYPE*
SOURCE DESCRIPTION DATE OF FIRST TEST RUN NO. OF RUNS
AGRICO CHEMICAL COMPANY 1 BLYTHEVILLE, AR TRC CS HC
MASS=O 1 PM10=0
AGRICO CHEMICAL COMPANY 1 BLYTHEVILLE, AR TRC CS HC
UREA GRANULATORS 10/12/78 MASS=O 1 PM10=3
CF INDUSTRIESI HARRISON, TN TRC CS HC
AMMONIUM NITRATE PRILLING TOWER 05/09/79 MASS=6 1 PM10=3
CF INDUSTRIESI HARRISON, TN TRC CS HC
PRILLING PROCESS, ROTARY COOLER 05/10/79 MASS=6 1 PM10=3
CHEVRON CHEMICALSI RICHMOND, CA SCOTT ENVIRONMENTAL CS
AMMONIUM SULFATE DRYING 12/13/78 MASS=6 1 PM10=1
COLUMBIA NITROGEN CORP.I AUGUSTA, GA TRC CS HC
AMMONIUM NITRATE PRILLING TOWER 08/14/80 MASS=O 1 PM10=6
COLUMBIA NITROGEN CORP. 1 AUGUSTA, GA TRC CS HC
AMMONIUM NITRATE PRILLING TOWER 08/15/80 MASS=O 1 PM10=6
COLUMBIA NITROGEN CORP. 1 AUGUSTA, GA TRC CS HC
AMMONIUM NITRATE PRILLING TOWER . 08/12/BO HASS=O 1 PIHO=6
COMINCO AMER-HOMESTEAD PT.I BEATRICE, NE YORK RESEARCH CS HC
AMMONIUM NITRATE GRANULATION, COOL 1 11/14178 MASS=4 1 P"10=3
N-REN CORP.-CHEROKEE DIV.I PRYOR, OK YORK RESEARCH CS HC
A"MONIUM NITRATE ~~~NULATION, COOLER 11/04i78 MASS=2 1 PM10=3
N-REN CORP.-CHEROKEE DIV.I PRYOR, OK YORK RESEARCH CS HC
AMMONIUM NITRATE GRANULATION, PRECOOLER/CHAIN MILL 11/06/78 HASS=11 1 PM10=3
NOT SPECIFIEDI NOT SPECIFIED, APT INC. CS
AMMONIUM NITRATE PRILLING TOWER MASS=O 1 P"10=11
NOT SPECIFIEDI LOS ANGELES, CA KVB CS HC
FERTILIZER BLENDING PROCESS 01/05/78 "ASS=O 1 P1'I10=2
SWIFT CHEMICAL COMPANY 1 BEAUMONT, TI MRI CS
AMMONIUM NITRATE ROTARY DRUM GRANULATOR 03/07179 MASS=6 1 PMIO=2
SNIFT CHE"ICAL COMPANY 1 BEAUMONT, TX MRI CS HC
AMMONIUM NITRATE ROTARY DRUM COOLER 03/08179 MASS=3 1 PM10=1
* FOR REPORT TYPE: CS = computer summary, HC = hard copy, PP = professional paper, and SR = summary report.
-------
09/30/88 LIST OF PARTICLE SIZE TEST REPORTS PAGE 2
AGRICHEMICAL INDUSTRY
NAME/LOCATION TEST BY REPORT TYPE'
SOURCE DESCRIPTION DATE OF FIRST TEST RUN NO. OF RUNS
UNION OIL CO. OF CALIF./ BREA, CA ENGINEERING SCIENCE CS HC
UREA PRILLING TOWER 04/02/79 MASS=O / PMIO=7
UNION OIL CO. OF CALIF./ BREA, CA ENGINEERING SCIENCE CS HC
UREA COOLER ROTARY DRUM 04/03/79 I'IASS=O / PMIO=3
UNION OIL CO. OF CALIF./ BREA, CA ENGINEERING SCIENCE CS HC
PRILLIN6 PROCESS, COOLER 03/30/79 MASS=O / PMIO=2
UNION OIL CO. OF CALIF./ BREA, CA ENGINEERING SCIENCE CS HC
PRILLING PROCESS, PRE DRYER 03/29/79 MASS=9 / PMIO=3
W. R. GRACE' COMPANY/ MEMPHIS, TN TRC CS HC
UREA PRILLING TOWER 08/14/79 MASS=O / PMIO=6
N. R. GRACE' COMPANY/ MEMPHIS, TN TRC CS HC
UREA PRILLING TOWER 08/20/79 MASS=O / PMIO=6
. FOR REPORT TYPE: CS = computer summary, HC = hard copy, PP = professional paper, and SR = summary report.
-------
CHEMICAL PROCESS INDUSTRY
-------
09/30/88 LIST OF PARTICLE SIZE TEST REPORTS PAGE 1
CHEMICAL PROCESS INDUSTRY
NAME/LOCATION TEST BY REPORT TYPH
SOURCE DESCRIPTION DATE OF FIRST TEST RUN NO. OF RUNS
BEKER INDUSTRIESI CONDA, ID MRI CS
MASS=O / PM10=0
BEKER INDUSTRIESI CONDA, ID HRI CS
PHOSPHORIC ACID CALCINER 04/10/75 /'IASS=O 1 PM10=5
NOT SPECIFIED/ NOT SPECIFIED, EPA PP
INORGANIC CHEMICAL MFG PLANT, ROTARY KILN 1 /'IASS=1 1 PM10=1
NOT SPECIFIEDI NOT SPECIFIED, APT INC. CS
POTASSIUM CHLORIDE ROTARY DRYER HASS=O 1 PM10=17
NOT SPECIFIEDI LOS ANGELES, CA KVB CS HC
BORIC ACID DRYER EXHAUST 12/14178 MASS=O 1 PM10=2
SCM CORPORATIONI BALTIMORE, MD ENGINEERING SCIENCE HC
TITANIUM DIOXIDE PLANT 12 CALCINER DRYER Obl05/86 HASS=O 1 PM10=2
VALLEY NITROGEN PRODUCERS 1 HELM, CA SCOTT ENVIRONMENTAL CS HC
AMMONIUM SULFATE DRYING 12/06/78 MASS=b 1 PM10=1
* FOR REPORT TYPE: CS = computer summary, HC = hard copy, PP = professional paper, and SR = summary report.
-------
EXTERNAL COMBUSTION SOURCES
-------
09/30/88
LIST OF PARTICLE SIZE TEST REPORTS
EXTERNAL COMBUSTION SOURCES
PAGE 1
NAME/LOCATION
TEST BY
REPORT Typn
SOURCE DESCRIPTION
DATE OF FIRST TEST RUN.
NO. OF RUNS
AIIERICAN CRYSTAL SUGAR COIIPANYI EAST GRAND FORKS, IIN INTERPOLL
HC
IIASS=O / PIII0=0
AIIERICAN CRYSTAL SUGAR COIIPANYI EAST GRAND FORKS, IIN INTERPOLL
NO.1 BOILER
12/2B/7b
HC
IIASS=O I PIII0=3
AIIERICAN CRYSTAL SUGAR COMPANY I EAST GRAND FORKS, IIN INTERPOLL
BOILER NO.2
12/29/7b
HC
IIASS=2 I PIII0=1
ARGONNE NATIONAL LA8., BLDG. 8/ NOT SPECIFIED, IL
COIIIIERCIAL BOILER 4, STOKER
IIRI
CS
IIASS=O I PIII0=5
BOSTON EDISON CO.I EVERETT, IIA
UTILITY BOILER b
U.S. EPA
CS
IIASS=O 1 PHI0=B
BOSTON EDISON CO. I NOT SPECIFIED,
UTILITY BOILER
ENVIRONIIENTAL ENG., INC.
CS
IIASS=O 1 PIII0=1
BOSTON EDISON CO;I BOSTON, IIA
UTILITY BOILER
UNKNOWN
CS
IIASS=O 1 PIII0=1
BOSTON EDISON CO.I NOT SPECIFIED,
UTILITY BOILER, TANGENTIAL
U.S. PUBLIC HEALTH SERVICES
CS
IIASS=O I PIII0=1
BUICK IIOTOR DIVISIONI FLINT, III
BOILER 11
CLEAN AIR ENGINEERING
01/22/85
HC
IIASS=4 1 PIII0=11
BUICK IIOTOR DIVISIONI FLINT, III
BOILER 13
CLEAN AIR ENGINEERING
01130/85
HC
I1ASS=2 1 PMI0=2
BULL RUN STEAII PLANT/ OAK RIDGE, TN
UTILITY BOILER
SORI
07/1b/74
CS
IIASS=O 1 PIII0=47
BULL RUN STEAII PLANT/ CLINTON, TN
ANGENTIAL
ACUREX
09/10i79
CS
IIASS=2 1 PIHO=O
BULL RUN STEAII PLANTI CLINTON, TN
UTILITY BOILER 1, TANGENTIAL
ACUREX
09/0b/79
CS
IIASS=4b I P1I10=b2
CHAIIPION BUILDING PRODUCTS I GAYLORD, III
PARTICLE BOARD PLANT, WOOD BOILER N4
UNKNOWN
01/05/79
HC
MASS=l I PIII0=1
CINCINNATI GAS & ELEC CO BECKJORD/ NEW RICHIIOND, OH ENVIROTECH
UNIT Ib STEAII GENERATOR
Ob/ll/73
HC
MASS=2 I PIII0=1
. FOR REPORT TYPE: CS = computer summary, HC = hard copy, PP = professional paper, and SR = summary report.
-------
09/30/88
LIST OF PARTICLE SIZE TEST REPORTS
EXTERNAL COMBUSTION SOURCES
PAGE 2
NAME/LOCATION
REPORT TYPEt
TEST BY
SOURCE DESCRIPTION
DATE OF FIRST TEST RUN
NO. OF RUNS
CINCINNATI GAS & ELEC CO BECKJORDI NEW RICHMOND, OH ENVIROTECH
UNIT 16 - STEAM GENERATOR
CITY OF VIRGINIA POWER PLANT 1 VIRGINIA, MN
NO.9 TYPE VOSP WATER TUBE BOILER
CLEVELAND ELEC ILLUI1 CO, AVON LAKEI CLEVELAND, OH
COAL-FIRED BOILERIS, AVON LAKE
CLEVELAND ELEC ILLUI1 CO, AVON LAKEI CLEVELAND, OH
COAL-FIRED BOILERI9, AVON LAKE
CLEVELAND ELEC ILLUI1 CO, CANAL RDI CLEVELAND, OH
UNIT 137 BOILER
CLEVELAND ELEC ILLUI1 CO, CANAL RDI CLEVELAND, OH
BOILER 36
CLEVELAND ELEC ILLUI1 CO, CANAL RDI CLEVELAND, OH
BOILER 134 EXHAUST STACK
CLEVELAND ELEC ILLUI1 CO, CANAL RDI CLEVELAND, OH
BOILER 136
CLEVELAND ELEC ILLUM CO, CANAL RDI CLEVELAND, OH
BOILER UNIT 137, EXHAUST STACK
CLEVELAND ELEC ILLUI1 CO, CANAL RDI CLEVELAND, OH
BOILER UNIT .36 .
CLEVELAND ELEC ILLUI1 CO, CANAL RDI CLEVELAND, OH
BOILER 137, HOPPER EXHAUST DUCT
CLEVELAND ELEC ILLUI1 CO, CANAL RDI CLEVELAND, OH
UNIT 137
CLEVELAND ELEC ILLUI1 CO, CANAL RDI CLEVELAND, OH
UNIT 137-BOILER HOPPER EVACUATION SYSTEI1
CLEVELAND ELEC ILLUI1 CO, CANAL RDI CLEVELAND, OH
BOILER UNIT 135
COLBERT STEAM PLANT 1 FLORENCE, AL
UTILITY BOILER 4
04/22/75
HC
MASS=10 1 PM10=S
INTERPOLL
HC
I1ASS=6 1 P1110=1
02123/78
ENGINEERING SCIENCE
04/01/82
HC
MASS=1 / PM10=O
ENGINEERING SCIENCE
03/30/82
HC
!lASS=1 1 P1110=4
ENVISAGE ENVIRONI1ENTAL
07128/80
HC
IIASS=1 1 PM10=1
ENVISAGE ENVIRONI1ENTAL
11/24/80
HC
MASS=1 1 P1110=2
ENVISAGE ENVIRONMENTAL
11/07/80
HC
MASS=1 / PMI0=2
ENVISAGE ENVIRONMENTAL
11105/80
HC
IIASS=1 / P1110=2
ENVISAGE ENVIRONMENTAL
07/21/80
HC
IIASS=1 1 PM10=5
ENVISAGE ENVIRONMENTAL
11/06/80
HC
IIASS=2 / P1'I10=5
ENVISAGE ENVIRONI1ENTAL
09/24/80
HC
MASS=2 / P1110=8
ENVISAGE ENVIRONI1ENTAL
08/23/80
HC
MASS=1 / PMI0=4
ENVISAGE ENVIRONMENTAL
07/31/80
HC
I1ASS=2 / PM10=6
ENVISAGE ENVIRONMENTAL
10/14/80
HC
MASS=2 / PM10=4
SORI
CS
MASS=O I P1110=25
01/131i6
i FOR REPORT TYPE: CS = computer summary, HC = hard copy, PP = professional paper, and SR = summary report.
-------
09/30/88
LIST OF PARTICLE SIZE TEST REPORTS
EXTERNAL CO"BUSTION SOURCES
PAGE 3
NAME/LOCATION
TEST BY
REPORT TYPE'
SOURCE DESCRIPTION
DATE OF FIRST TEST RUN
NO. OF RUNS
COLBERT STEAl'! PLANT I CHATTANOOGA, TN
UTILITY BOILER
SORI
02120/73
CS
"ASS=O I P1'!10=11
DEFENSE ELECTRONICS SUPPLY CENTER I DAYTON, OH
CENTRAL HEATING PLANT, BOILER 3
UNKNOWN
SR
"ASS=1 I PMI0=1
DIAMOND INTERNATIONAL CORPORATIONI CINCINNATI, OH
BOILER NO. 301
MONSANTO RESEARCH
03/30/76
HC
MASS=1 I PMI0=2
ENCINA POWER PlANTI CARlSBAD, CA
UTILITY BOILER 4
STANFORD RESEARCH INSTITUTE
09/13/77
CS
MASS=O I PMI0=5
ENCINA POWER PLANT 1 CARlSBAD, CA
UTILITY BOILER 2
STANFORD RESEARCH INSTITUTE
09/14/77
CS
MASS=O I PMI0=4
ENCINA POWER PLANT I CARlSBAD, CA
UTILITY BOILER 1
STANFORD RESEARCH INSTITUTE
09/16/77
CS
I'IASS=O I P1'!10=6
FIRESTONE TIRE & RUBBER I POTTSTOWN, PA
INDUSTRIAL BOILER 4, FACE-FIRED
TRW
09/~1/77
CS HC
MASS=O I PMI0=2
FIRESTONE TIRE & RUBBER I POTTSTOWN, PA
INDUSTRIAL BOILER 4, FACE-FIRED
TRW
10/04/77
CS HC
HASS=O I PIII0=1
FORD MOTOR CO.I CLEVELAND, OH
BOILER NO. 5, COAL-FIRED-~~?PER EVACUATION SYSTEM.
MPA
10/26/79
HC
MASS=2 I PMI0=2
F~rtD MOTOR CO. I ClEVElAND~ OH
B::iJLER NO.1
I1PA
10/24/74
HC
IIASS=1 I PH10=1
FORD MOTOR CO. I CLEVELAND, OH
BOILER NO.2
MPA
10123/74
HC
HASS=1 ! PI'II0=1
FORD 110TOR CO. I CLEVELAND, OH
BOILER NO.5
MPA
10/22/74
HC
MASS=1 / P1110=1
FORD IIOTOR CO./ BROOKPARK, OH
BOILER 11
ENGINEERING SCIENCE
09/07/78
HC
IIASS=O 1 PMI0=1
FORD IIOTOR CO.I BROOKPARK, OH
BOILER 11, CHAIN GRATE
ENGINEERING SCIENCE
09/06/78
HC
I1ASS=O I PIII0=1
FORD MOTOR CO. I BROOKPARK, OH
BOILER 4, CHAIN GRATE
ENGINEERING SCIENCE
08/29/78
HC
HASS=l I PIII0=3
* FOR REPORT TYPE: CS = co~puter summary, HC = hard copy, PP = professional paper, and SR = summary report.
-------
09/30/88 LIST OF PARTICLE SIZE TEST REPORTS PAGE 4
EXTERNAL COMBUSTION SOURCES
NAI'IE!LOCATION TEST BY REPORT TYPH
SOURCE DESCRIPTION DATE OF FIRST TEST RUN NO. OF RUNS
FORD MOTOR CO./ BROOKPARK, OH ENGINEERING SCIENCE HC
BOILER NO.1, CHAIN GRATE 09/06/78 MASS=1 / PIII0=0
FORD MOTOR CO./ BROOKPARK, OH ENGINEERING SCIENCE HC
BOILER NO.5 09/14/78 MASS=O I PM10=1
FORD HOTOR CO./ BROOKPARK, OH ENGINEERING SCIENCE HC
BOILER NO.5, SPREADER STOKER 09/14/78 !'IASS=1 i PMlO=l
FORD MOTOR CO.I BROOKPARK, OH ENGINEERING SCIENCE HC
NOS. 2, 3, & 4 COAL-FIRED BOILERS, CHAIN GRATE 11/27 i79 HASS=1 I PM10=5
FORD MOTOR CO.I SHARONVILLE, OH MPA HC
NO.1 BOILER HOPPER EVACUATION STREAM 05/10/79 I1ASS=2 I PMlO=3
GALLATINI GALLATIN, IN SORI CS HC
UTILITY BOILER & COLLECTER 4C 021 19i74 MASS=O / PM10=11
GENERAL ELECTRIC COMPANY I MT. VERNON, IN PEDCO HC
COAL-FIRED BOILER - ERIE 06/13178 MASS=~ I PM10=1
GENERAL ELECTRIC COMPANY/ MT. VERNON, IN PEDCO HC
COAL-FIRED BOILER - LASKER 06/13178 MASS=2 / PM10=2
GENERAL MOTORS CORP. I MCCOOK, IL SWANSON HC
BOILER 1 11/04173 MASS= 1 I PI'I1 0= 1
GENERAL HOTORS CORP./ HCCOOK, IL SWANSON HC
BOILER 2 OS/21/73 MASS=1 I PMI0=1
GENERAL MOTORS CORP./ MCCOOK, IL SWANSON HC
BOILER 3 04/09/73 MASS=1 / PMlO=1
GENERAL MOTORS CORP.I LANSING, HI ERG HC
BOILER 111 10/10/77 MASS=2 / PM10=1
GENERAL HOTORS CORP./ LANSING, HI ERG HC
BOILER 17 10/10/77 HASS=2 / PM10=3
GENERAL MOTORS CORP./ ELYRIA, OH ERG HC
tjUMBER 3 BOILER 02/27/80 MASS=l / PM10=2
GENERAL MOTORS CORP./ ELYRIA, OH ERG HC
NUMBER 3 BOILER, SIDE STREAM COLLECTOR 02127/80 MASS=2 I PM10=3
* FOR REPORT TYPE: CS = computer summary, HC = hard copy, PP = professional paper, and SR = summary report.
-------
09130/88
LIST OF PARTICLE SIZE TEST REPORTS
EXTERNAL COMBUSTION SOURCES
PAGE 5
NAME/LOCATION
TEST BY
REPORT TYPH
SOURCE DESCRIPTION
DATE OF FIRST TEST RUN
NO. OF RUNS
GENERAL MOTORS CORP./ SANDUSKY, OH
BOILER 13 - COAL-FIRED
ERG
12/06/79
HC
MASS=1 / P1110=3
GENERAL MOTORS CORP. 1 SANDUSKY, OH
BOILER .3 - HULTICLONE SIDE STREAM
ERG
12/06/79
HC
"ASS=2 1 PMI0=1
GENERAL MOTORS CORP. 1 LANSING, MI MONSANTO RESEARCH
12 COAL-FIRED BOILER, SIDE STREAM BAGHOUSE,HULTICLONE HOPPER
04/19/82
HC
MASS=O / P1110=3
GENERAL "OTORS CORP.I LANSING, MI
NO.2 COAL-FIRED BOILER, SPREADER STOKER
MONSANTO RESEARCH
04/19/82
HC
HASS=6 I PMI0=18
GENERAL MOTORS CORP.I LANSING, MI MONSANTO RESEARCH
NO.2 COAL-FIRED BOILER,SIDESTREM BGH ON MULTICLONE HOPPER
04/19/82
HC
MASS=l 1 PMI0=O
GENERAL MOTORS CORP. I PONTIAC, HI
BOILERS '1, 4, 5, 7, 8
CLAYTON
HC
MASS=O / PHI0=1
GENERAL MOTORS CORP.I NORWOOD~ OH PEDCO
COAL-FIRED BOILER 11, TRAVELING GRATE SPREADER STOKER
09/08/75
HC
HASS=2 I PMI0=1
GENERAL MOTORS CORP. I NORWOOD, OH PEDCO
COAL-FIRED BOILER 12, TRAVELING GRATE SPREADER STOKER
09/10/75
HC
MASS=2 I PMI0=1
GENERAL HOTORS CORP. 1 NORWOOD, OH PEDCO
COAL-FIRED BOILER '3, TRAVELING GRATE SPREADER STOKER
09/12/75
HC
MASS=2 / PMI0=1
GETTY OIL CO WILLIAMS HOLDING LEASEI SANTA MARIA, CA YORK RESEARCH
STEAM GENERATOR .8
12/11/80
HC
HASS=3 I PMI0=9
GULF STATES FACILITYI DEMOPOLIS, AL
UTILITY BOILER
SORI
05/15/74
CS
MASS=O / PHIO=7
HARTZELL INDUSTRIESI PIGUA, OH
WOODWASTE-FIRED BOILER
PEDCO
04/20/77
HC
MASS=l I PM10=1
HAWAIIAN COMMERCIAL & SUGAR CO.I PUUNENE, HI
BOILER 3,TRAVELING GRATE SPREADER STOKERS
MRI
07/29/75
HC
HASS=l 1 PMI0=1
HAWAIIAN COMMERCIAL & SUGAR CO.I PUUNENE, HI
BOILERS 1 & 2, TRAVELING GRATE SPREADER STOKERS
MRI
07129/75
HC
MASS=l I PIUO=l
HOERNER WALDORF MILL I MISSOULA, MT
INDUSTRIAL BOILER, RECOVERY BOILER 3
ESE
03/22/73
CS
HASS=O I PMI0=7
* FOR REPORT TYPE: CS = computer summary, HC = hard copy, PP = professional paper, and SR = sumlary report.
-------
09/30/88
lIST OF PARTICLE SIZE TEST REPORTS
EXTERNAL COMBUSTION SOURCES
PAGE 6
NAME/LOCATION
TEST BY
REPORT TYPE'
SOURCE DESCRIPTION
DATE OF FIRST TEST RUN
NO. OF RUNS
HOMER CITY GENERATING STATIONI HOMER CITY, PA
UNIT NO. 3
HEMEON ASSOCIATES
09/26/78
HC
MASS=2 1 P1110=1
HUTCHINSON SUGAR 1 NAALEHU, HI
BOILER
ZURN
06/08/71
HC
MASS=2 1 PM10=2
ILLINOIS POWER COMPANY, HAVANAI HAVANA, IL
HAVANA UNIT NO. 6
MARTIN MARIETTA CHEMICALS
02/01184
HC
MASS=4 1 PM10=4
J.B. SIMS GENERATING STATIONI GRAND HAVEN, MI
BOILER 11
SWANSON
01/16/79
HC
MASS=2 1 PM10=3
J.B. SIMS GENERATING STATIONI GRAND HAVEN, MI
BOILER 12
SWANsm,
01/16/79
HC
I1ASS=2 1 PM10=2
JOHNSTON 80ILER COMPANY 1 MARION, OH
FLUIDIZED BED BOILER
ALMEGA CORP.
02/25/B1
HC
I1ASS=2 1 PH10=1
KAISER ALUMINUM & CHEMICAL CORP. 1 NEWARK, OH
2 COAL-FIRED BOILERS, STOKERS
ENTROPY
03/28/78
HC
MASS=! 1 PM10=3
KANSAS CITY POWER & lIGHTI lA CYGNE, KS
UTILITY BOILER 1, CYCLONE
TRIrl
04/18/78
CS HC
MASS=2 1 P1110=2
KERR INDUSTRIESI CONCORD, NC
INDUSTRIAL BOILER 2, STOKER
ENVIRO-SYSTEMS & RESEARCH
06/1B/74
CS HC
I'IASS=O 1 P1110=7
KERR INDUSTRIESI CONCORD, HC
INDUSTRIAL BOILER 2, STOKER
ENVIRO-SYSTEMS & RESEARCH
06/06/74
CS HC
MASS=O 1 PM10=7
KERR INDUSTRIESI CONCORD, NC
INDUSTRIAL BOILER 2, STOKER
ENVIRO-SYSTEHS & RESEARCH
11/21/74
CS HC
HASS=O 1 PM10=5
KERR INDUSTRIESI CONCORD, NC
INDUSTRIAL BOILER 2, STOKER
ENVIRO-SYSTEMS & RESEARCH
06/24/74
CS HC
MASS=O / PM10=11
KERR INDUSTRIESI CONCORD, NC
INDUSTRIAL BOILER 2, STOKER
EHVIRO-SYSTEMS & RESEARCH
08/26/74
CS
MASS=O I PH10=7
HERAMEC PLANT UNION ELECTRICI ST. lOUIS, MO
UTILITY BOILER 1, TANGENTIAL
MRI
03/05/75
CS
MASS=9 I PH10=12
MERAMEC PLANT UNION ElECTRICI ST. LOUIS, 1'10
UTILITY BOILER 1, TANGENTIAL
I'IRI
11/17/75
CS
MSS=8 1 PM10=B
* FOR REPORT TYPE: CS = computer summary, HC = hard copy, PP = professional paper, and SR = summary report.
-------
09/30/88
LIST OF PARTICLE SIZE TEST REPORTS
EXTERNAL COMBUSTION SOURCES
PAGE 7
NAME/LOCATION
TEST BY
REPORT TYPEt
SOURCE DESCRIPTION
DATE OF FIRST TEST RUN
NO. OF RUNS
HERAHEC PLANT UNION ELECTRICI ST. LOUIS, 1'10
UTILITY BOILER 1
SORI
05/02/75
CS
HASS=O I PH10=2b
HERAMEC PLANT UNION ELECTRICI ST. LOUIS, "0
UTILITY BOILER 1, TANGENTIAL
SORI
10/31/74
CS
MASS=O ! PH10=b1
MINNESOTA POWER & LIGHT-CLAY BOSWELl NOT SPECIFIED, "NINTERPOLL
STATION NO.3 BOILER
Ob/23/75
HC
MASS=1 / P1110=1
MINNESOTA STATE PRISONI STILLWATER, "N
BOILER NO.2
I1I1T ENVIRONI1ENTAL, INC
01/04/BO
HC
MASS=1 I PM10=2
MINNESOTA STATE PRISON/ STILLWATER, I1N
NO.4 BOILER, WATER TUBE
INTERPOLL
01/13/84
HC
MASS=1 / P1'I10=2
MINNESOTA STATE PRISONI STILLWATER, MN
NO.4 COAL-FIRED BOILER, STOKER
INTERPOLL
12/28/78
HC
MASS=1 / Pi'110=1
MITCHELL POWER STATIONI ALBANY, SA
UTILITY 80ILER 1, SINGLE WALL
SORI
05/25/77
CS
MASS=O I PMI0=8
MITCHELL POWER STATIONI ALBANY, SA
UTILITY BOILER 1, SINGLE WALL
SORI
ObI 13/77
CS HC
MASS=O " PM10=9
MONITOR SUGAR COMPANY I BAY CITY, I'll
BOILER
SWANSON
11/22/83
HC
MASS=O ! PM10=1
MONTANA POWER & PUGET SOUND I COLSTRIP, "T
UTILITY BOILER
SORI
05/17/77
CS
MASS=7 I PM10=24
HUNICIPAL POWER PLANT I AHES, IA
MUNICIPAL POWER PLANT
IOWA STATE UNIVERSITY
PP
HASS=O I PM10=b
NATIONAL STARCH & CHEMICAL CO.I INDIANAPOLIS, IN
NO.5 BOILER
KELSEY & ASSOC.
09/12/73
HC
MASS=4 I P"10=2
NATIONAL STARCH & CHEI1ICAL CO./ INDIANAPOLIS, IN
rm. 5 BOILER
KELSEY & ASSOC.
08101/73
HC
i'1ASS=5 I PH10=2
NORTHERN STATES PWR, 3RD ST STATIONI ST. PAUL, 111
BOILER 12
POLLUTION CURBS, INC.
03/07/74
HC
MASS=2 I PM10=1
NORTHERN STATES PWR, 3RD ST STATION/ ST. PAUL, I'll
BOILER 13
POLLUTION CURBS, INC.
03/08/74
HC
MASS=O I PMI0=1
* FOR REPORT TYPE: CS = computer summary, HC = hard copy, PP = professional paper, and SR = summary report.
-------
09/30/8B
LIST OF PARTICLE SiZE TEST REPORTS
EXTERNAL COMBUSTION SOURCES
PAGE B
NAME/lOCATION
TEST BY
REPORT TYPH
SOURCE DE~RIPTION
DATE OF FIRST TEST RUN
NO. OF RUNS
NORTHERN STATES PWR, 3RD ST STATIONI ST. PAUL, III POLLUTION CURBS, INC.
BOILER 14 03/11/74
NOT SPECIFIEDI NOT SPECIFIED, UNIVERSAL OIL PROD.
SPREADER STOKER-FIRED BOILERS 07/01/73
NOT SPECIFIEDI NOT SPECIFIED, TEXAS A&M UNIVERSITY
BOILER
NOT SPECIFIEDi NOT SPECIFIED, UNIVERSITY OF TOKYO
COMBUSTION FURNACE
NOT SPECIFIEDI WEST LAFAYETTE, IN PURDUE UNIV.
COAL-FIRED POWER PLANT, AMBIENT PLUME
NOT SPECIFIEDI NOT SPECIFIED, UNKNOWN
COAL-FIRED BOILER
NOT SPECIFIEDI NOT SPECIFIED, UNKNOWN
OIL-FIRED BOILER
NOT SPECIFIEDI NOT SPECIFIED, EXXON
OIL-FIRED PACKAGE BOILER
NOT SPECIFIEDI NOT SPECIFIED, KVB
INDUSTRIAL BOILER 03/10/77
NOT SPECIFIEDI NOT SPECIFIED, IL U.S. EPA
UTILITY BOILER
NOT SPECIFIED; NOT SPECIFIED, APT INC.
UTILITY BOILER 09/10/73
NOT SPECIFIEDI NOT SPECIFIED, APT INC.
UTILITY BOILER
NOT SPECIFIEDI NOT SPECIFIED, KVB
INDUSTRIAL BOILER 2
NOT SPECIFIEDI NOT SPECIFIED, NY KVB
INDUSTRIAL BOILER 4
NOT SPECIFIEDI NOT SPECIFIED, CA KV8
INDUSTRIAL BOILER
HC
MASS=l 1 PIII0=1
HC
MASS=2 I PMI0=21
PP
MASS=O I PMI0=1
PP
MASS=O I PMlO=l
PP
MASS=O ; PIHO=2
PP
MASS=O ; PMI0=1
PP
tlASS=O i PI'II0=1
PP
MASS=10 ; PMIO=10
CS HC
MASS=O 1 PMI0=4
CS
MASS=O 1 PMI0=2
CS HC
MASS=O 1 PMI0=6
CS HC
MASS=O ; P1110=b
CS HC
MASS=l 1 PMlO=l
CS HC
MASS=O ; PMI0=5
CS HC
MASS=O i PI'II0=2
i FOR REPORT TYPE: CS = computer summary, HC = hard copy, PP = professional paper, and SR = summary report.
-------
09/30/88 LIST OF PARTICLE SIZE TEST REPORTS PAGE 9
EXTERNAL COMBUSTION SOURCES
NAME/LOCATION TEST BY REPORT TYPE.
SOURCE DESCRIPTION DATE OF FIRST TEST RUN NO. OF RUNS
NOT SPECIFIEDI NOT SPECIFIED, IL KVB CS HC
INDUSTRIAL BOILER 1 MASS=O 1 P!'IIO=1
NOT SPECIFIEDI NOT SPECIFIED, !'IN KVB CS
INDUSTRIAL BOILER 5 MASS=O 1 PI'IIO=3
NOT SPECIFIEDI NOT SPECIFIED, IL KVB CS HC
INDUSTRIAL BOILER 8 MASS=O 1 P!'IIO=l
NOT SPECIFIEDI NOT SPECIFIED, NE KVB CS HC
INDUSTRIAL BOILER 7 IIASS=O 1 PI'IIO=3
NOT SPECIFIEDI NOT SPECIFIED, OH KVB CS HC
INDUSTRIAL BOILER 6 i'lASS=O I P!'I10=5
NOT SPECIFIEDI NOT SPECIFIED, OH KVB CS
INDUSTRIAL BOILER 6 I'IASS=O 1 PM10=2
NOT SPECIFIEDI NOT SPECIFIED, NY KVB CS HC
INDUSTRIAL BOILER 2 MASS=O 1 PI'IIO=2
NOT SPECIFIEDI NOT SPECIFIED, SaRI CS
UTILITY BOILER 10/05/76 MASS=b 1 P1I10=1b
NOT SPECIFIEDI NOT SPECIFIED, UNKNOWN CS
INDUSTRIAL BOILER 05/25/78 MASS=O 1 PI'IIO=7
NOT SPECIFIED! NOT SPECIFIED, TRC CS
UTILITY BOILER 09/17/76 !'IASS=O 1 Pi'l10=4
NOT SPECIFIEDI NOT SPECIFIED, TRC CS
INDUSTRIAL BOILER 03/16/76 MASS=O 1 P1110=9
NOT SPECIFIEDI NOT SPECIFIED, TRC CS
INDUSTRIAL BOILER 05!11/77 MASS=O 1 PI'IIO=13
NOT SPECIFIEDI NOT SPECIFIED, SORI CS
UTILITY BOILER 11/03/72 !'IASS=O 1 P!'I10=6
NOT SPECIFIEDI NOT SPECIFIED, CO SORI CS HC
UTILITY BOILER 04/29/74 MASS=O 1 PM10=24
NOT SPECIFIEDI NOT SPECIFIED, SORI CS
UTILITY BOILER 09/26/72 I'IASS=O 1 P1I10=10
* FOR REPORT TYPE: CS = computer summary, HC = hard copy, PP = professional paper, and SR = summary report.
-------
09/30/88 LIST OF PARTICLE SIZE TEST REPORTS PAGE 10
EXTERNAL COMBUSTION SOURCES
NAME/LOCA HON TEST BY REPORT TYPEt
SOURCE DESCRIPTION DATE OF FIRST TEST RUN NO. OF RUNS
NOT SPECIFIED/ NOT SPECIFIED, SORI CS
UTILITY BOILER 01126/77 MASS=O / PH10=45
NOT SPECIFIED/ NOT SPECIFIED, SaRI CS
UTILITY BOILER 5 02124/76 , HASS=O / PM10=24
NOT SPECIFIED/ NOT SPECIFIED, SORI CS
UTILITY BOILER 4 OIi 12/76 MASS=14 / PM10=63
NOT SPECIFIED/ NOT SPECIFIED, SORI CS
UTILITY BOILER 08/05/75 MASS=O / PM10=21
NOT SPECIFIED/ NOT SPECIFIED, SORI CS
UTILITY BOILER 04/27/76 HASS=O / PM10=24
NOT SPECIFIED/ NOT SPECIFIED, SORI CS
UTILITY BOILER 03/12/7 6 MASS=O 1 PM10=18
NOT SPECIFIEDI NOT SPECIFIED, UNITED MCGILL CORP. CS
INDUSTRIAL BOILER 11/12/76 MASS=O 1 P1'I10=7
NOT SPECIFIED/ NOT SPECIFIED, UNKNOWN CS
INDUSTRIAL BOILERS 1, 2 & 3 07127/76 MASS=1 1 PM10=15
NOT SPECIFIED! NOT SPECIFIED, WASH. DEPT. OF ECOLOGY CS
INDUSTRIAL BOILER 10/12/77 MASS=O 1 PIU 0= 5
NOT SPECIFIEDI NOT SPECIFIED, TX KVB CS
INDUSTRIAL BOILER 08/24/76 MASS=O 1 P1'\10=1
NOT SPECIFIED/ NOT SPECIFIED, TX KVB CS
INDUSTRIAL BOILER 09/15/76 MASS=O 1 PM10=4
NOT SPECIFIEDI NOT SPECIFIED, WI KVB CS
INDUSTRIAL BOILER 11/03/76 HASS=O 1 P1'\10=3
NOT SPECIFIEDI NOT SPECIFIED, TRW CS HC
UTILITY BOILER 09/21/77 MASS=1 / P1'I10=1
NOT SPECIFIEDI NOT SPECIFIED, TRill CS
UTILITY BOILER 09/22/77 MASS=1 ! P1'\10=1
NOT SPECIFIEDI NOT SPECIFIED, TRW CS HC
UTILITY BOILER 09/27/77 MASS=1 1 P1110=1
* FOR REPORT TYPE: CS = computer summary, HC = hard copy, PP = professional paper, and SR = summary report.
-------
09/30/88 LIST OF PARTICLE SIZE TEST REPORTS PAGE 11
EXTERNAL COMBUSTION SOURCES
NAME/LOCATION TEST BY REPORT TYPH
SOURCE DESCRIPTION DATE OF FIRST TEST RUN 110. OF RUNS
NOT SPECIFIEDI NOT SPECIFIED, DE TRW CS
UTILITY BOILER, SINSLE WALL 10/09/77 KASS=O 1 P1110=1
. NOT SPECIFIEDI NOT SPECIFIED, DE TRW CS
UTILITY BOILER, SINSLE WALL 11/10/77 HASS=O / PH10=1
NOT SPECIFIEDI NOT SPECIFIED, SC TRW CS
UTILITY BOILER, SINSLE WALL 01107/78 I'IASS=O 1 P1'I10=1
NOT SPECIFIEDI NOT SPECIFIED, SC TRW CS
UTILITY BOILER, TANGENTIAL 06/01/78 I'IASS=O / P1'I10=1
NOT SPECIFIEDI NOT SPECIFIED, SC TRW CS
UTILITY BOILER, TANGENTIAL 06/02/78 MASS=O / PH10=1
NOT SPECIFIEDI NOT SPECIFIED, SC SCA CS
UTILITY BOILER, HORIZONTAL OPPOSED WALL 09/28/78 I'IASS=O / PM10=1
NOT SPECIFIED! NOT SPECIFIED, SC SCA CS
UTILITY BOILER, HORIZONTAL OPPOSED WALL 09126/78 I'IASS=O / P1'I10=1
NOT SPECIFIEDI NOT SPECIFIED, IL TRW CS
UTILITY BOILER, CYCLONE 05/03/78 MASS=O I PM10=1
NOT SPECIFIEDI NOT SPECIFIED, IN TRW CS
UTILITY BOILER, CYCLONE 04/30/78 MASS=O .I PM10=1
NOT SPECIFIEDI NOT SPECIFIED, IL TRW CS
UTILITY BOILER, CYCLONE 05/09/78 I1ASS=O 1 P1110=1
NOT SPECIFIEDI NOT SPECIFIED, OH SCA CS
UTILITY BOILER 08/14/78 HASS=O / P1110=1
NOT SPECIFIEDI NOT SPECIFIED, OH GCA CS
UTILITY BOILER, HORIZONTAL CYCLONE 08/16/78 MASS=O ! PIll 0= 1
NOT SPECIFIED/ NOT SPECIFIED, OH TRW CS
UTILITY BOILER, STOKER 11/02/77 I'IASS=O I P1110=1
NOT SPECIFIEDI NOT SPECIFIED, IL SCA CS
UTILITY BOILER, STOKER 09/11/78 MASS=O I P1110=1
NOT SPECIFIED/ NOT SPECIFIED, DE TRW CS
UTILITY BOILER, TANGENTIAL OS/25/78 I1ASS=O / P1110=1
. FOR REPORT TYPE: CS = computer summary, HC = hard copy, PP = professional paper, and SR = summary report.
-------
09/30/B8 LIST OF PARTICLE SIZE TEST REPORTS PAGE 12
EXTERNAL COMBUSTION SOURCES
NAME 1 L OCA TI ON TEST BY REPORT TYPEa
SOURCE DESCRIPTION DATE OF FIRST TEST RUN NO. OF RUNS
NOT SPECIFIEDI NOT SPECIFIED, SC GCA CS
UTILITY BOILER, TANGENTIAL 03/02/78 I'IASS=O 1 P1'I10=1
NOT SPECIFIEDI NOT SPECIFIED, FL GCA CS
UTILITY BOILER, TANGENTIAL 03/07178 I'IASS=O 1 P1'I10=1
NOT SPECIFIEDI NOT SPECIFIED, FL GCA CS
UTILITY BOILER, SINGLE WALL 03/08/78 MASS=O 1 P1'I10=1
NOT SPECIFIEDI NOT SPECIFIED, CA TRW CS
UTILITY BOILER 07113/77 'II\SS=O 1 P1110=1
NOT SPECIFIEDI LOS ANGELES, CA KVB CS HC
INDUSTRIAL BOILER, FIRETUBE 09/13/77 MASS=O / P1'I10=2
NOT SPECIFIEDI LOS ANGELES, CA KVB CS HC
INDUSTRIAL BOILER 09/15/77 I'IASS=O 1 P1'I10=2
NOT SPECIFIED 1 LOS ANGELES, CA KVB CS HC
INDUSTRIAL BOILER, FIRETUBE 09120/77 MASS=O / P1'I10=3
NOT SPECIFIED/ LOS ANGELES, CA KVB CS HC
BORIC ACID BOILER 12i12/77 I1ASS=O 1 P1110=2
NOT SPECIFIEDI LOS ANGELES, CA KVB CS HC
UTILITY BOILER, HORIZONTAL OPPOSED WALL 01127/78 I'IASS=O 1 PM10=2
NOT SPECIFIEDI LOS ANGELES, CA KVB CS HC
UTILITY BOILER, HORIZONTAL OPPOSED WALL 03/0b/78 MASS=O 1 P1'I10=2
NOT SPECIFIEDI LOS ANGELES, CA KVB CS HC
UTILITY BOILER, HORIZONTAL OPPOSED WALL 03/08/78 MASS=O / Pt110=2
NOT SPECIFIEDI LOS ANGELES, CA KVB CS HC
UTILITY BOILER, SINGLE WALL 01/1b/78 MASS=O 1 PMI0=2
NOT SPECIFIEDI LOS ANGELES, CA KVB CS
UTILITY BOILER, SINGLE WALL 01/18178 I'IASS=O 1 PH10=2
NOT SPECIFIEDI NOT SPECIFIED, KVB CS
INDUSTRIAL BOILER, STOKER 0912bi77 I'IASS=O 1 P1'I10=1
NOT SPECIFIEDI NOT SPECIFIED, GCA CS
COHI'IERCIAL BOILER, STOKER 02/22/79 HASS=O 1 PH10=1
* FOR REPORT TYPE: CS = computer summary, HC = hard copy, PP = professional paper, and SR = summary report.
-------
09/30/88 LIST OF PARTICLE SIZE TEST REPORTS PAGE 13
EXTERNAL COMBUSTION SOURCES
NAME/LOCA TI ON TEST BY REPORT TYPE.
SOURCE DESCRIPTION DATE OF FIRST TEST RUN NO. OF RUNS
NOT SPECIFIEDI NOT SPECIFIED, GCA CS
COI1I1ERCIAL BOILER, WALL FIRED 02/27/78 HASS=O 1 PHI0=1
NOT SPECIFIEDI NOT SPECIFIED! GCA CS
COI1I1ERCIAL BOILER, STOKER 03/15/79 IIASS=O 1 PMI0=1
NOT SPECIFIEDI NOT SPECIFIED, TRW CS
COMMERCIAL BOILER, STOKER 03/13/79 I1ASS=O 1 PMI0=!
NOT SPECIFIEDI NOT SPECIFIED, GCA CS
CDMMERCIAL BOILER, WALL FIRED 03/21/79 HASS=O 1 PM!O=!
NOT SPECIFIEDI NOT SPECIFIED, GCA CS
COMI1ERCIAL BOILER, STOKER 03/27/79 IIASS=O 1 PMI0=1
NOT SPECIFIEDI NOT SPECIFIED, GCA CS
COIIMERCIAL BOILER, STOKER 03/29/79 I1ASS=O / PI'!! o=!
NOT SPECIFIEDI NOT SPECIFIED, TRW CS
INDUSTRIAL BOILER, STOKER 02l0!/79 MASS=O 1 PMI0=1
NOT SPECIFIEDI NOT SPECIFIED, TRN CS
INDUSTRIAL BOILER, STOKER 02103/79 HASS=O 1 PMI0=1
NOT SPECIFIEDI NOT SPECIFIED, TRW CS
INDUSTRIAL BOILER, STOKER 02/0b/79 IIASS=O 1 PMI0=1
NOT SPECIFIEDI NOT SPECIFIED, TRN CS
INDUSTRIAL BOILER, STOKER 02/09/79 I1ASS=O 1 PMI0=1
NOT SPECIFIEDI NOT SPECIFIED, TRW CS
INDUSTRIAL BOILER, STOKER 03/08/79 MASS=O i PMI0=1
NOT SPECIFIED/ NOT SPECIFIED, TRW CS
INDUSTRIAL BOILER, STDKER 02/09/79 I'IASS=O I P1110=1
NOT SPECIFIEDI NOT SPECIFIED, TRW CS
INDUSTRIAL BOILER! STOKER 05/23/79 HASS=O l PI'II0=!
NOT SPECIFIEDI NOT SPECIFIED, TRW CS
INDUSTRIAL BOILER, SINGLE WALL 05/19/79 MASS=O 1 PM!O=!
NOT SPECIFIEDI NOT SPECIFIED! TRW CS
UTILITY BOILER 12/04/79 HASS=O / PPI1 0=4
. FOR REPORT TYPE: CS = computer summary, HC = hard copy, PP = professional paper, and SR = summary report.
-------
09/30/88 LIST OF PARTICLE SIZE TEST REPORTS PAGE 14
EXTERNAL COMBUSTION SOURCES
NAME/LOCATION TEST BY REPORT TYPE*
SOURCE DESCRIPTION DATE OF FIRST TEST RUN NO. OF RUNS
NOT SPECIFIEDI NOT SPECIFIED, KVB CS
INDUSTRIAL BOILER, STOKER 11/20/78 HASS=6 I PH10=1
NOT SPECIFIEDI NOT SPECIFIED, KVB CS
INDUSTRIAL BOILER, STOKER 11/09/79 MSS=6 I P1'110=1
NOT SPECIFIEDI NOT SPECIFIED, TRW CS
TANGENTIAL UTILITY BOILER MASS=O I PH10=1
NOT SPECIFIEDI NOT SPECIFIED, TRW CS
TANGENTIAL UTILITY BOILER I'IASS=O I PM10=1
NUCLA STATIONI NUCLA, CO GCA CS
UTILITY BOILER 2 09/21/74 MASS=43 I PMI0=44
OAHU SUGAR CO.I WAIPAHU, HI AMFAC, INC. HC
STEAM GENERATOR 11/15/72 MASS=2 I Pi'l10=2
OAHU SUGAR CO.I WAIPAHU, HI ZURN HC
BAGASSE FIRE BOILER 08/23/73 MASS=1 I PHI0=1
OHIO EDISON COMPANY I TORONTO, OH MPA HC
UNIT NO. 11 COAL-FIRED ELECTRICAL GENERATOR 08/10/82 MASS=1 I PM10=4
OHIO EDISON COMPANY I LORAIN, OH "PA HC
UNIT NO. 12 COAL FIRED, STEAM POWERED ELECTRICAL GENERATOR 08/18/81 I'IASS=2 I PMI0=5
OHIO EDISON COMPANY I SHADYSIDE, OH ERG HC
BOILER NO.7 06/09/82 MASS=4 1 PH10=0
OHIO EDISON COMPANY 1 SHADYSIDE, OH ERG HC
BOILER NO.8 06/08/82 /'IASS=4 I PM10=7
OHIO EDISON COMPANY 1 NILES, OH /'IPA HC
UNIT 11 BOILER 09/15/81 MASS=l 1 PH10=2
OHIO EDISON COMPANY I SPRINGFIELD, OH ENGINEERING SCIENCE HC
BOILER 11, STOKER 06/01/79 MASS=1 1 PH10=3
OHIO EDISON COMPANY I SPRINGFIELD, OH ENGINEERING SCIENCE HC
BOILER '2, STOKER 06i 12/79 /'IASS=l I P/'II0=3
OHIO EDISON COMPANY I SPRINGFIELD, OH ENGINEERING SCIENCE HC
BOILER 13, CYCLONE TYPE 05/25/79 MASS=1 I PMI0=2
* FOR REPORT TYPE: CS = computer summary, HC = hard copy, PP = professional paper, and SR = summary report.
-------
09/30/88 LIST OF PARTICLE SIZE TEST REPORTS PAGE 15
EXTERNAL COMBUSTION SOURCES
NAKE/LOCATION TEST BY REPORT TYPEt
SOURCE DESCRIPTION DATE OF FIRST TEST RUN NO. OF RUNS
OLOKELE SUGAR 1 KAUKAKANI, KAUAI, HI IURN HC
BOILER 06/08/71 KASS=2 1 PI'II0=2
PENNSYLVANIA REHABILITATION CENTERI JOHNSTOWN, PA PENN STATE UNIV. HC
COAL-FIRED BOILER 11, STOKER 12/05/78 MASS=1 1 PH10=2
PIGUA KUNICIPAL POWER PLANT 1 PIGUA, OH SYSTEI'IS TECHNOLOGY CORP. HC
BOILER NO.4 07/27/78 MASS=1 1 PMI0=2
PP&L, BRUNNER ISLAND STATIONI BRUNNER ISLAND, PA ETS HC
BOILER NO.1, TANGENTIALLY FIRED 08/12/81 I'IASS=4 ! P1'I10=12
PP&L, SUNBURY STATIONI SHAI'IOKIN DAK, PA U.S. EPA CS
UTILITY BOILER lA 08/08173 KASS=O 1 Pt110=4
PP&L, SUNBURY STATIONI SHAHOKIN DAI'I, PA GCA CS
UTILITY BOILER lA 01108/75 KASS=20 ! PM10=3B
PP&L, SUNBURY STATIONI SHAI'IOKIN DAM, PA SCA CS HC
UTILITY BOILER 1A 02/04/75 KASS=O 1 PM10=34
PP&L, SUNBURY STATIONI SHAMOKIN DAI'I, PA GCA CS HC
UTILITY BOILER 1A 03/20i75 MASS=16 1 P1110=33
PP&L, SUNBURY STATIONI SHAKOKIN DAH, PA MONSANTO RESEARCH CS
UTILiTY BOILER 1A 12/16/74 HASS=O ! PMI0=1
PP&L, SUNBURY STATION! SHAMOKIN DAM, PA MONSANTO RESEARCH CS HC
UTILITY BOILER 1A 12/16174 I'IASS=O 1 PI'II0=4
PP&L, SUNBURY STATIONI SHAMOKIN DAI'I, PA I'IONSANTO RESEARCH CS HC
UTILITY BOILER 1A 12/16/74 HASS=O ! PM10=2
PP&L, SUNBURY STATIONI SHAMOKIN DAM, PA MONSANTO RESEARCH CS HC
UTILITY BOILER 1A 12/10/74 t1ASS=O 1 Pt110=lO
PP&L, SUNBURY STATIONI SHAMOKIN DAM, PA I'IONSANTO RESEARCH CS HC
UTILITY BOILER 1A 12/16/74 ~ASS=O 1 P1110=11
PROCTOR & GAMBLE COI'IPANYI CHEBOY6AN, I'll PEl HC
WASTE FUEL BOILER 08/09/84 I1ASS=3 1 PI'IIO=6
PUBLIC UTILITIES POWER PLANT 1 VIRGINIA, I1N INTERPOLL HC
NO.8 WATER TUBE BOILER 03/30179 I1ASS=7 1 P1'I10=O
t FOR REPORT TYPE: CS = coaputer summary, HC = hard copy, PP = professional paper, and SR = summary report.
-------
09/30/88 LIST OF PARTICLE SIZE TEST REPORTS PAGE 16
EXTERNAL COMBUSTION SOURCES
NAME/LOCATION TEST BY REPORT TYPE'
SOURCE DESCRIPTION DATE OF FIRST TEST RUN NO. OF RUNS
PURDUE UNIVERSITYI WEST LAFAYETTE, IN PURDUE UNIV. PP
COAL FIRED POWER PLANT~ SPREADER STOKER MASS=1 ! PM10=1
RHINELANDER PAPER CO. I RHINELANDER, WI ENVIRONMENTAL TECH. & ENG. HC
NO.7 COAL-FIRED BOILER 12/08/80 MASS=2 1 PIUO=2
RHINELANDER PAPER CO.! RHINELANDER, WI CH2M HILL HC
NO.7 COAL-FIRED BOILER 01/28/87 MASS=2 1 P1I10=4
RHINELANDER PAPER CO. I RHINELANDER, WI CH211 HILL HC
NO.7 COAL FIRED BOILER 05/03/83 I1ASS=1 ! P1'!10=1
ROUGE STEEL COI1PANYI DEARBORN, 111 I1PA HC
BOILER NO.4 05/12/87 HASS=1 / PI'UO=3
ROUGE STEEL COIIPANYI DEARBORN, MI MPA HC
BOILER NO.5 05/14/87 MASS=1 I PM10=3
ROUGE STEEL COI1PANYI DEARBORN, 111 MPA HC
BOF - OPEN HOOD, STACK 06/13/85 MASS= 1 I PIU 0= 1
ROUGE STEEL COIIPANY/ DEARBORN, III IIPA HC
COKE OVEN PUSHING, SCRUBBER STACK NO.1 08120/85 MASS=1 1 PI'I10=!
ROUGE STEEL COI1PANY/ DEARBORN, III HPA HC
COKE OVEN UNDERFIRING, COKE OVEN COMBUSTION STACK "AD 06/24/85 I1ASS=1 1 P1'I10=1
ROUGE STEEL COMPANY 1 DEARBORN, 111 I1PA HC
COKE OVEN UNDERFIRING, COKE OVEN COMBUSTION STACK "BD OS/29/85 MASS=O I PM10=1
ROUGE STEEL COMPANY I DEARBORN, 111 MPA HC
HIH6 PRESSURE BOILER STACK NO.5 05/09/85 IIASS=! I PIUO=1
ROUGE STEEL COMPANY I DEARBORN, 111 MPA HC
LOW PRESSURE BOILER STACK NO.4 05/07/85 I1ASS=1 I PIUO=1
SHAWNEE STEAM PLANT I NOT SPECIFIED, U.S. EPA CS
UTILITY BOILER OS/22/7 4 MASS=O / PM10=14
SHAWNEE STEAM PLANTI PUDUCAH, KY U.S. EPA CS
UTILITY BOILER 10 MASS=O I PM10=4
SHAWNEE STEAI1 PLANT I PADUCAH, KY BECHTEL & TVA CS HC
UTILITY BOILER 10 10/12/76 I1ASS=9 I PM10=63
. FOR REPORT TYPE: CS = computer summary, HC = hard copy, PP = professional paper, and SR = summary report.
-------
09/30iBB
LIST OF PARTICLE SIZE TEST REPORTS
EXTERNAL COMBUSTION SOURCES
PAGE 17
NAME/LOCATION
TEST BY
REPORT TYPEt
SOURCE DESCRIPTION
DATE OF FIRST TEST RUN
NO. OF RUNS
SHAWNEE STEAM PLANT/ PADUCAH, KY TVA
UTILITY BOILER 10 01/26/77
SOMERSET STATE HOSPITALi SOMERSET, PA PENN STATE UNIV.
BOILER 1, STOKER 11/15/7B
SORG PAPER CO./ MIDDLETOWN, OH YORK RESEARCH
INDUSTRIAL BOILER 04/23/BO
SOUTHWESTERN PUBLIC SERVICE/ HARRINGTON STATION, ETS
HARRINGTON UNIT 3 BOILER, TANGENTIAL 07/0BiB1
SPRINGFIELD PUBLIC UTIL POWER PLANT/ SPRINGFIELD, MN INTERPOLL
NO.2 BOILER OS/22/75
ST. REGIS PAPER/ TACOMA, WA WASH. DEPT. OF ECOLOGY
INDUSTRIAL BOILER 03i31/76
ST. REGIS PAPER/ TACOMA, VA UNKNOWN
INDUSTRIAL BOILER, HOG FUEL BOILER 14 03/31/76
STATE CORRECTIONAL INSTITUTION/ HUNTINGDON, PA PENN STATE UNIV.
COAL-FIRED BOILER 14, STOKER 04/19/7B
TVA-WIDOWS CREEK GUNTERSVILLE LAKE/ BRIDGEPORT, AL MRI
UTILITY BOILER 5, SINGLE WALL OB/21/74
UNION ELECTRIC, MERMAC PLANT/ ST. LOUIS, MO HRI
UTILITY BOILER 1, TANGENTIAL 12/04/73
VARIOUS/ NOT SPECIFIED, RADIAN
PLANT CS, UNIT NO.1 BOILER, TANGENTIALLY FIRED 09/20176
VARIOUS/ NOT SPECIFIED, RADIAN
PLANT HS, UNIT NO.2 BOILER, TANGENTIALLY FIRED 09/02176
WESTERN STATE HOSPITAL/ STEILACOOM, WA ASA CONSULTANTS
BOILER 02109/83
CS
MASS=O / PH10=74
HC
MASS=1 / P1I10=2
CS HC
IIASS=B / PM10=4
HC
IIASS=2 / PIHO=4
HC
MASS=1 , PI'Il0=2
CS
MASS=O / P1I10=2
CS
MASS=O / PI'IlO=2
HC
MASS=1 , PM10=4
CS
IIASS=6 I PM10=6
CS
MASS=O / P1I10=26
HC
MASS=1 I PH10=1
HC
MASS=1 / PM10=1
HC
MASS=O , P1I10=1
WESTON PAPER & IIANUFACTURING COMP.' TERRA HAUTE, IN BEE
BOILER NO.1
05/10/73
HC
MASS=1 / PM10=1
WESTON PAPER & IIANUFACTURING COMP./ TERRA HAUTE, IN BEE
NO.4 COAL FIRED BOILER
05/09/73
HC .
MASS=1 I PM10=1
* FOR REPORT TYPE: CS = computer summary, HC = hard copy, PP = professional paper, and SR = summary report.
I
-------
09/30/88
LIST OF PARTICLE SIZE TEST REPORTS
EXTERNAL CO"BUSTION SOURCES
PAGE 18
NAME/LOCATION
TEST BY
REPORT TYPEt
SOURCE DESCRIPTION
DATE OF FIRST TEST RUN
NO. OF RUNS
WESTON PAPER & MANUFACTURING COMP./ TERRA HAUTE, IN BEE
WABASH BOILER
05/15/73
HC
MASS=1 1 PM10=1
WEYERHAUSER CORP.I LONGVIEW, WA MONSANTO RESEARCH
INDUSTRIAL BOILER, STOKER, HOG FUEL BOILER 11 12/09/80
WHITE PINE COPPER 1 WHITE PINE, I'll AL"EGA CORP.
BOILER #1 04/13/78
WHITE PINE COPPERI WHITE PINE, I'll AL"EGA CORP.
BOILER 11 04/13/78
WOOD RIVER POWER STATIONI EAST ALTON, IL SORI
UTILITY BOILER 4 10/30/73
YOUNGSTOWN THERMAL 1 YOUNGSTOWN, OH ENVISAGE ENVIRONMENTAL
12 BOILER 02111/87
YOUNGSTOWN THERMALI YOUNGSTOWN, OH ENGINEERING SCIENCE
COAL-FIRED BOILER NO.2 02/14/84
CS HC
MASS=12 1 PM10=2
HC
KASS=4 / PI'Il 0=6
HC
MASS=2 1 PIHO=6
CS
MASS=O I PM10=10
HC
MASS=! 1 PM10=!
HC
I1ASS=3 1 PI'I!O=3
t FOR REPORT TYPE: CS = co~puter summary, HC = hard copy, PP = professional paper, and SR = summary report.
-------
FABRICATED METAL PRODUCTS
-------
09/30/88 LIST OF PARTICLE SIZE TEST REPORTS PAGE 1
FABRICATED METAL PRODUCTS
NAIIE/LOCATION TEST BY REPORT TYPEt
SOURCE DESCRIPTION DATE OF FIRST TEST RUN NO. OF RUNS
NOT SPECIFIEDI LOS ANGELES, CA KVB HC
IIASS=O 1 PIII0=O
NOT SPECIFIEDI LOS ANGELES, CA KVB HC
AUTOHOBILE SURFACE COATING SPRAY BOOTH 02/14178 IIASS=O 1 P1I10=2
t FOR REPORT TYPE: CS = computer sum~ary, HC = hard coPY, PP = professional paper, and SR = summary report.
-------
FERROUS METALS INDUSTRY
-------
09/30/88
LIST OF PARTICLE SIZE TEST REPORTS
FERROUS METALS INDUSTRY
PAGE 1
NAME/LOCATION
TEST BY
REPORT TYPH
SOURCE DESCRIPTION
DATE OF FIRST TEST RUN
NO. OF RUNS
AIRCO ALLOYS & CARBIDE PLANT 1 NIAGARA FALLS, NY
RESOURCES RESEARCH INC.
CS
MASS=O 1 PMI0=0
AIRCO ALLOYS & CARBIDE PLANT 1 NIAGARA. FALLS, NY
FERROALLOY ELECTRIC ARC FURNACE
RESOURCES RESEARCH INC.
08/31171
CS
MASS=12 1 P"10=7
FOOTE MINERAL CO.I GRAHAM, \!IV
FERROALLOY ELECTRIC ARC FURNACE
GCA
03/17/81
CS
MASS=O 1 PMI0=2b
NOT SPECIFIEDI NOT SPECIFIED, EPA
OPEN ELECTRIC ARC FURNACE PRODUCING LOW-CARBON FERROCHROMIUM
PP
/'fASS=l 1 Pi'l10=1
NOT SPECIFIEDI NOT SPECIFIED,
IRON FOUNDRY CLEANING ROOM EXHAUST START
UNKNOWN
PP
MASS=2 1 PMI0=2
NOT SPECIFIEDI NOT SPECIFIED,
GREY IRON CUPOLA
UNKNOWN
11121/74
CS
MASS=8 I PMI0=12
NOT SPECIFIEDI NOT SPECIFIED,
SECONDARY FERROUS, IRON CUPOLA
APT WC.
CS HC
MASS=O i PM10=15
NOT SPECIFIEDI NOT SPECIFIED,
IRON CUPOLA
APT INC.
08/01/75
CS
MASS=O I PM10=34
NOT SPECIFIEDI NOT SPECIFIED,
UNKNOWN
SORI
02/07/73
CS
I'IASS=O 1 PM10=7
NOT SPECIFIEDI NOT SPECIFIED,
STEEL FOUNDRY
SORI
04126/73
CS
MASS=O I PMI0=2
NOT SPECIFIEDI NOT SPECIFIED,
IRON CUPOLA
AIR POL. TECH.
CS
MASS=O 1 PM10=90
NOT SPECIFIEDI LOS ANGELES, CA
ABRASIVE BLASTING STEEL
KVB
03/14/78
CS HC
MASS=O / PIH 0=2
VARIOUS FOUNDRIESI NOT SPECIFIED,
GREY IRON FOUNDRY CUPOLA-A
PENN STATE UNIV.
06/01/76
HC
MASS=l 1 PIII0=1
VARIOUS FOUNDRIESI NOT SPECIFIED,
GREY IRON FOUNDRY CUPOLA-B
PENN STATE UNIV.
07/01/76
HC
MASS=! 1 PMI0=1
VARIOUS FOUNDRIESI NOT SPECIFIED,
GREY IRON FOUNDRY CUPOLA-C
PENN STATE UNIV.
08/01/76
HC
MASS=! / PMI0=1
* FOR REPORT TYPE: CS = computer summary, HC = hard copy, PP = professional paper, and SR = summary report.
-------
09/30/88 lIST OF PARTICLE SIZE TEST REPORTS PAGE 2
FERROUS METALS INDUSTRY
NAI'IE/lOCATION TEST BY REPORT TYPE.
SOURCE DESCRIPTION DATE OF FIRST TEST RUN NO. OF RUNS
VARIOUS FOUNDRIES/ NOT SPECIFIED, PENN STATE UNIV. HC
GREY IRON FOUNDRY CUPOlA-D 09/01/76 !'IASS=1 / PM10=1
VARIOUS FOUNDRIES/ NOT SPECIFIED, PENN STATE UNIV. HC
GREY IRON FOUNDRY CUPOlA-E 10/01/76 !'IASS=1 / P!'I10=1
VARIOUS FOUNDRIES/ NOT SPECIFIED, PENN STATE UNIV. HC
GREY IRON FOUNDRY CUPOlA-F 10/01/76 MASS=1 / P1'I10=1
VARIOUS FOUNDRIES/ NOT SPECIFIED, PENN STATE UNIV. HC
GREY IRON FOUNDRY CUPOlA-G 11/01/76 !'IASS=1 / P1110=1
t FOR REPORT TYPE: CS = computer summary, HC = hard copy, PP = profes$ional paper, and SR = summary repDrt.
-------
FOOD & AGRICULTURAL INDUSTRY
-------
09/30/88
LIST OF PARTICLE SIZE TEST REPORTS
FOOD & AGRICULTURAL INDUSTRY
PAGE 1
NAME/LOCA TI ON
TEST BY
REPORT TYPEa
SOURCE DESCRIPTION
DATE OF FIRST TEST RUN
NO. OF RUNS
ALMOTAI NOT SPECIFIED,
NASH. DEPT. OF ECOLOGY
CS
I'IASS=O 1 P1'I10=O
ALI'IOTAI NOT SPECIFIED,
GRAIN PROCESSING ELEVATOR
. WASH. DEPT. OF ECOLOGY
08/20175
CS
MASS=O 1 P1110=1
ALI'IOTAI NOT SPECIFIED,
GRAIN HILL PROCESSING
WASH. DEPT. OF ECOLOGY
09/08/75
CS
HASS=O ! P1'I10=1
AI1ERICAN CRYSTAL SUGAR COI1PANYI EAST GRAND FORKS, I'IN INTERPOLL
EAST LIME KIlt. 12/03/81
AI'IERICAN CRYSTAL SUGAR COMPANY 1 EAST GRAND FORKS, MN INTERPOLl
PULP DRYER A 12/02/81
AMERICAN CRYSTAL SUGAR COMPANY/ EAST GRAND FORKS, MN INTERPOLL
PULP DRYER B 12/02/81
AMERICAN CRYSTAL SUGAR COMPANYI EAST GRAND FORKS, MN INTERPOLL
PULP DRYER-A 12/02/81
AI'IERICAN CRYSTAL SUGAR COMPANY I EAST GRAND FORKS, MN INTERPOLL
PULP DRYER-B 12/02/81
AI1ERICAN CRYSTAL SUGAR COI1PANYI EAST GRAND FORKS, MN HHERPOLL
WEST LIHE KILN 12/03/81
CONTINENTAL GRAIN, PASCO I NOT SPECIFIED, WASH. DEPT. OF ECOLOGY
GRAIN MILL PROCESSING 07/22/75
FAIRFIELD GRAINI NOT SPECIFIED, UNKNOWN
GRAIN MILL PROCESSING 05/14175
GRIFFITH lABORATORIESI CHICAGO, IL CELL COTE
DIRECT FIRED HYDROLYZED GRAIN SPRAY DRYER 01,/01/77
NOT SPECIFIEDI LOS ANGELES, CA KVB
RICE PROCESSING 10/11/77
NOT SPECIFIEDI LOS ANGELES, CA KVB
CAROB KIBBLE ROASTING 03/23178
SHEFFLERI NOT SPECIFIED, WASH. DEPT. OF ECOLOGY
GRAIN MILL PROCESSING 07/21175
HC
MASS=1 1 PM10=1
HC
MASS=O 1 PM10=1
HC
MASS=O 1 PM10=1
HC
MASS=1 1 PM10=O
HC
MASS=1 / PM10=O
HC
MASS=1 I P1'I10=1
CS
I1ASS=O I H1l0=2
CS
MASS=O l' PM10=7
HC
i'lASS=2 1 PM10=b
CS HC
MASS=O 1 PMIO=2
CS HC
MASS=O I P1'I10=1
CS
MASS=O 1 P1'I10=1
* FOR REPORT TYPE: CS = computer summary, HC = hard copy, PP = professional paper, and SR = summary report.
-------
09/30/88 LIST OF PARTICLE SIZE TEST REPORTS PAGE 2
FOOD & AGRICULTURAL INDUSTRY
NAIIE/LOCATION TEST BY REPORT TYPEt
SOURCE DESCRIPTION DATE OF FIRST TEST RUN NO. OF RUNS
SPOKANE SEED/ SPOKANE, NA NASH. DEPT. OF ECOLOGY CS
GRAIN KILL PROCESSING 05/13/75 IIASS=O / PM10=4
UNIONTONN/ NOT SPECIFIED, WASH. DEPT. OF ECOLOGY CS
GRAIN MILL PROCESSING 09/07/75 MASS=O / PMI0=3
UNITED GRAIN! TACOIIA, WA GCA HC
GRAIN TERMINAL, SHIP LOADING 10/27178 I'IASS=2 / PIII0=2
t FOR REPORT TYPE: CS = computer summary, HC = hard copy~ PP = professional paper, and SR = summary report.
-------
INTERNAL COMBUSTION SOURCES
-------
09/30/88 LIST OF PARTICLE SIZE TEST REPORTS PAGE 1
INTERNAL COMBUSTION SOURCES
NAME/LOCATION TEST BY REPORT TYPEt
SOURCE DESCRIPTION DATE OF FIRST TEST RUN NO. OF RUNS
NOT SPECIFIEDI NOT SPECIFIED, MN KVB CS
MASS=O I PM10=0
NOT SPECIFIEDI NOT SPECIFIED, MN KVB CS
RECIPROCATING ENGINE 04/13/7b MASS=O 1 PIHO=3
NOT SPECIFIED/ LOS ANGELES, CA KVB CS HC
INTERNAL COMBUST RECIPROCATING ENGINE 10120/77 MASS=O 1 PM10=2
NOT SPECIFIEDI LOS ANGELES, CA KVB CS HC
RECIPROCATING ENGINE 12/07i77 MASS=O / PM10=1
. FOR REPORT TYPE: CS = computer summary, HC = hard copy, PP = professional paper, and SR = summary report.
-------
IRON & STEEL
-------
09/30/88 LIST OF PARTICLE SIZE TEST REPORTS PA6E 1
IRON & STEEL
NAME/LOCATION TEST BY REPORT TYPEt
SOURCE DESCRIPTION DATE OF FIRST TEST RUN NO. OF RUNS
ALAN WOOD STEEL! CONSHOHOCKEN, PA BEE HC
IfASS=O 1 PM10=0
ALAN WOOD STEEL 1 CONSHOHOCKEN, PA BEE HC
SINTER WINDBOX 12/17/71 MASS=3 1 PM10=6
ALAN WOOD STEEL! CONSHOHOCKEN, PA BETHLEHEM STEEL CORP. HC .
SINTER WINDBOX 02/07173 HASS=2 1 P!'I10=1
ALAN WOOD STEEL! CONSHOHOCKEN, PA BEE HC
SINTER WINDBOX 04/16/74 MASS=1 1 PH10=1
ALLIED CHEMICAL CORP. 1 ASHLAND, KY YORK RESEARCH HC
COKE OVEN PUSHING 04/18/79 HASS=O 1 PM10=11
ALTECH SPECIALTY STEEL CORP. 1 WATERVLIET, NY PEDCO HC
ADD FURNACE 04/0bl81 I1ASS=O 1 P1I10=3
ALTECH SPECIALTY STEEL CORP. 1 WATERVLIET, NY PEDCO HC
ELECTRIC ARC FURNACE WITH OXYGEN LANCE 04/06/81 MASS=O 1 P1'I10=2
ARMCO STEEL CORP./ ASHLAND, KY UNKNOWN HC
SINTER WINDBOX, PILOT SCRUBBER 08/01/70 MASS=O 1 PM10=1
ARMCO STEEL CORP.! HOUSTON, TX MPA HC
SWTER WINDBOX 07/01/71 MASS=2 / P1110=1
ARMCO STEEL CORP. 1 HOUSTON, TX SOUTHWESTERN LABORATORIES HC
SINTER WINDBOX 02/24/76 HASS=2 1 PM10=2
BABCOCK & WILCOX/ BEAVER FALLS, PA ROY F. WESTON HC
ELECTRIC ARC FURNACE SHOP 10/18/72 MASS=2 / PM10=7
BETHLEHEM STEEL CORP./ BURNS HARBOR, IN MPA SR
COKE OVEN PUSHING, BATTERY NO.1 SHED 10/23/74 MASS=2 1 P1'I10=6
BETHLEHEM STEEL CORP./ BURNS HARBOR, IN MPA CS
COKE OVEN 10/23/74 IIASS=O / PM10=3
BETHLEHEM STEEL CORP./ BETHLEHEM, PA HPA HC
BLAST FURNACE CAST HOUSE 12/15/77 MASS=O.l PM 1 0= 2
BETHLEHEM STEEL CORP./ BETHLEHEM, PA "PA HC
BOF - OPEN HOOD, HOT METAL CHARGE 02/01/77 MASS=O / PM10=1
* FOR REPORT TYPE: CS = computer summary, HC = hard copy, PP = professional paper, and SR = summary report.
-------
09/30/88 LIST OF PARTICLE SIlE TEST REPORTS PAGE 2
IRON & STEEL
NAIIE/LOCATION TEST BY REPORT TYPE'
SOURCE DESCRIPTION DATE OF FIRST TEST RUN NO. OF RUNS
BETHLEHEII STEEL CORP. 1 BETHLEHEM, PA IIPA HC
BOF - OPEN HOOD, TAP CYCLE 02/01/77 I1ASS=O / 1'1110=2
BETHLEHEI1 STEEL CORP./ BETHLEHEM, PA YORK RESEARCH HC
SINTER WINDBOX, ESP 2 06/16/75 MASS=2 l PM10=2
BETHLEHEM STEEL CORP./ BETHLEHEII, PA YORK RESEARCH HC
SINTERING - DISCHARGE END 05/19/75 !'IASS=1 1 P1'I10=1
BETHLEHEII STEEL CORP./ BURNS HARBOR, IN CLAYTON HC
COKE OVEN PUSHING, BATTERY 1 SHED 03/03i75 MASS=1 / 1'1110=1
BETHLEHEI1 STEEL CORP. 1 BURNS HARBOR, IN MPA HC
COKE OVEN PUSHING 02101176 IIASS=2 1 1'1110=1
BETHLEHEM STEEL CORP. 1 BURNS HARBOR, IN MPA HC
COKE OVEN PUSHING, WITH AND WITHOUT FOG SPRAY 02/01/76 MASS=O 1 1'1110=1
BETHLEHEI'I STEEL CORP. 1 SEATTLE! WA UNIVERSITY OF WASHINGTON HC
ELECTRIC ARC FURNACE WITH OXYGEN LANCE 01/01/75 MASS=2 1 1'1110=55
BETHLEHEM STEEL CORP.I SPARROWS POINT! liD GCA HC
SINTER WIND BOX, STRAND 7, NORTH SCRUBBER 11/14/79 MASS=! / P1110=3
BETHLEHEI'I STEEL CORP. 1 SPARROWS POINT, liD SCA HC
SINTER WINDBOX, STRAND 7, SOUTH SCRUBBER 11/14/79 MASS=O 1 1'1110=3
CARPENTER TECHNOLOGY CORP. 1 READING, PA PEDCO HC
ADD FURNACE, NO 2 ADD 04/28/81 I1ASS=2 / PM10=2
CF&I STEEL 1 PUEBLO, CO SETON, JOHNSON & ODELL HC
BOF-OPEN HOOD, ROOF MONITOR 12/02/75 MASS=1 l P1'I10=1
CF&I STEELI PUEBLO, CO U.S. EPA CS HC
SINTER WINDBOX (ASSUMED) 06/12/75 MASS=12 1 1'1110=6
CF&I STEELI PUEBLO, CO SETON, JOHNSON & ODELL HC
COKE OVEN PUSHING 08/05/76 MASS=1 1 1'/'110=4
CF&I STEEL/ PUEBLO, CO U.S. EPA HC
SINTER WINDBOI, (2) STRANDS 06/09/75 MASS=O 1 1'1110=3
DOFASCOI HAMILTON, ONTARIO, YORK RESEARCH HC
COKE QUENCHING, NORTH TOWER 08/01/77 MASS=O 1 1'1110=1
* FOR REPORT TYPE: CS = computer summary, HC = hard copy, PI' = professional paper, and SR = sum.ary report.
-------
09/30/88
LIST OF PARTICLE SIZE TEST REPORTS
IRON & STEEL
PAGE 3
NAME/LOCATION
TEST BY
REPORT TYPEJ
SOURCE DESCRIPTION
DATE OF FIRST TEST RUN
NO. OF RUNS
DOFASCO/ HAMILTON, ONTARIO,
BLAST FURNACE CAST HOUSE, TOTAL EVACUATION
BCI'I
08/24/76
HC
I'IASS=O / P1'I10=1
ESCHWEILER-BERGWERKS/ ERIN, IrIG
COKE GUENCHING
YORK RESEARCH
10/01/78
HC
I'IASS=O / Ptl10=4
FORD I'IOTOR CO./ DEARBORN, I'll
COKE OVEN PUSHING, BATTERY A/AX
CLAYTON
01101/75
HC
MASS=2 ! P1'I10=2
FORD KOTOR CO. I DEARBORN, I'll
BLAST FURNACE CAST HOUSE .C., OVER SLAG POTS
MPA
10/21/77
HC
MASS=2 / PM10=1
FORD MOTOR CO./ DEARBORN, I'll
BLAST FURNACE CAST HOUSE .C., OVERALL TREADWELL CAR
HPA
10/21/77
HC
I'IASS=O / Ptl10=1
GREAT LAKES CARBON CORP. I ST. LOUIS, 1'10
COKE OVEN PUSHING, UNCONTROLLED SHED
CLAYTON
04/21/75
HC
HASS=2 1 PM10=2
INLAND STEEL 1 EAST CHICAGO, IN AlMEGA CORP.
COKE OVEN UNDERFIRING, COMBUSTION STACK BATTERY 10, PLANT 2
10/18/84
HC
HASS=O 1 PI'II0=3
INLAND STEEL/ EAST CHICAGO, IN
COKE OVEN PUSHING, BATTERY C COKE SIDE SHED
CLEAN AIR ENGINEERING
03/10/75
HC
MASS=2 / PM10=2
INLAND STEEL/ EAST CHICAGO, IN
BOF TAPPING, SECONDARY CONTROL SYSTEM
ACUREX
08/13/80
HC
HASS=2 1 PM10=1
INLAND STEEl/ EAST CHICAGO, IN
BOF, HOT METAL TRANSFER TO, SECONDARY CONTROL SYSTEI'I
ACUREX
08/13/80
HC
I'IASS=2 / P1'I10=1
INLAND STEEL 1 EAST CHICAGO, IN
COKE OVEN PUSHING, CALDERON GUENCH.IN COKE GUIDE
UNK~IOWN
06/10/76
HC
I'IASS=!) 1 PM10=1
INLAND STEEL/ EAST CHICAGO, IN
COKE OVEN PUSHING, PLANT 2 BATTERY 9
UNKNOWN
06/07/76
HC
MASS=2 1 PII~\t=1
J & L STEEL 1 CLEVELAND, OH
SINTERING-WINDBOX, DISCHARGE HOOD.
WFI
03/04/75
HC
MASS=2 1 PM10=2
J & l STEEL 1 AlIGUIPPA, PA
BOF CHARGING (HOT I'IETAL)
NFl
04/29/75
HC
MASS=2 1 PI'II0=1
J & l STEEl/ ALIGUIPPA, PA
BOF TAPPING
WFI
04/29/75
HC
MASS=2 1 PM10=1
* FOR REPORT TYP[; CS = computer summary, HC = hard copy, PP = professional paper, and SR = summary report.
-------
09/30/88
LIST OF PARTICLE SIZE TEST REPORTS
IRON & STEEL
PAGE 4
NAlfE/LOCATI ON
SOURCE DESCRIPTION
J & L STEEL 1 ALIOUIPPA, PA
HOT METAL RELADLING (BOF)
J & L STEEL 1 ALIGUIPPA, PA
SINTERIN6 - COOLER, DEDUSTER DUCT
J & L STEEL 1 CLEVELAND, OH
SINTER WINDBOX
J & L STEELI EAST CHICAGO, IN
SINTER WINDBOX
J & l STEEL 1 PITTSBURGH, PA
COKE OVEN UNDERFIRING, COMBUSTION STACK BATTERY P-3S
J & L STEEL 1 PITTSBURGH, PA
COKE OVEN UNDERFIRING, COMBUSTION STACK BATTERY P-4
J & L STEEL 1 CLEVELAND, OH
SINTER WltW80X
J & L STEEL 1 PITTSBURGH, PA
COKE OVEN CHARGING
KAISER STEELI FONTANA, CA
BOF CHARGING
KAISER STEEL 1 FONTANA, CA
80F TAPPING
KAISER STEELI FONTANA, CA
HOT METAL DESULFURIZATION
KAISER STEEL 1 FONTANA, CA
SINTER WINDBOX, DISCHARGE END, BREAKER
KAISER STEEL 1 FONTANA, CA
HOT METAL DESULFURIZATION
KAISER STEEL 1 FONTANA, CA
BOF - CHARGING, SECONDARY CONTROL SYSTEM
KAISER STEELi FONTANA, CA
BOF - TAPPING, SECONDARY CONTROL SYSTEM
TEST 8Y
REPORT TYPE.
DATE OF FIRST TEST RUN
NO. OF RUNS
NFl
HC
MASS=1 1 PH10=1
05/01/75
ENVIRONMENTAL SCIENCES
06/13/72
HC
MASS=1 / PM10=3
NFl
HC
MASS=3 1 PPl10=3
02/24/75
IfPA
HC
. MASS=2 1 PM10=12
06/11/80
8EE
HC
MASS=1 1 PH10=3
04/21/75
8EE
HC
MASS=1 f PM10=3
04/21/75
UNKNOWN
SR
MASS=O 1 PM10=1
11/01/75
MITRE CORP.
HC
MASS=O / PM10=1
01/01/73
ACUREX
HC
HASS=O 1 PM10=15
04/01/80
ACUREX
HC
HASS=O 1 P1110=9
04/01/80
ACUREX
HC
HASS=O i P1'\10=1
02/27/80
YORK RESEARCH
HC
HASS=O i P1110=1
06/03/75
ACUREX
HC
MASS=2 1 PM10=2
03/07/80
ACUREX
HC
MASS=O 1 P1110=4
04/07/80
ACUREX
HC
MASS=2 / PM10=2
03131iSO
* FOR REPORT TYPE: CS = computer summary, HC = hard coPY, PP = professional paper, and SR = summary report.
-------
09/30/88
LIST OF PARTICLE SIZE TEST REPORTS
IRON & STEEL
PAGE 5
NAME/LOCA TI ON
SOURCE DESCRIPTION
KAWASAKI STEEL CORP.; CHIBA, JAPAN,
BOF - OPEN HOOD (ASSUMED)
KAWASAKI STEEL CORP./ CHIBA, JAPAN,
BOF CHARGWG
KAWASAKI STEEL CORP. 1 CHIBA, JAPAN,
ROTARY COMBUSTOR/BOILER SYSTEM, ESP NO.1
KAWASAKI STEEL CORP.I CHIBA, JAPAN,
ROTARY COMBUSTOR/BOILER SYSTEM, ESP NO.2
KOPPERS CO. INC. 1 WOODWARD, AL
COKE OVEN UNDERFIRING, BATTERY 5
LONE STAR STEEL 1 HOUSTON, TX
OPEN HEARTH FURNACE
LUKENS STEEL CORP. 1 COATESVILLE, PA
OPEN HEARTH FURNACE, DURING MELT
LUKENS STEEL CORP.I COATESVILLE, PA
OPEN HEARTH FURNACE, DURING REFINING
NATIONAL STEELI GRANITE CITY, IL
SINTER WINDBOX, SCRUBBER
NATIONAL STEELI DETROIT, I'll
SINTER WINDBOX, NO.2
NATIONAL STEEL 1 WEIRTON, NV
BASIC OXYGEN FURNACE, HOT METAL CHARGE
NATIONAL STEEL 1 WEIRTON, NV
COKE OVEN PUSHING, BATTERY 18, NORTH STACK OF TSQ
NATIONAL STEEL 1 WEIRTON, WV
COKE OVEN PUSHING, BATTERY 18, SOUTH STACK OF TSQ
NATIONAL STEEL 1 WEIRTON, WV
COKE QUENCHING, BATTERY 18, QUENCH TOWER EAST SIDE
tlATIONAL STEEL! WEIRTON, NV
COKE QUENCHING, QUENCH TOWER
TEST BY
REPORT TYPH
DATE OF FIRST TEST RUN
110 . OF RUNS
SUMITOMO HEAVY INDUSTRIES
HC
MASS=l 1 PM10=1
SUMITOMO HEAVY INDUSTRIES
HC
HASS=l 1 PM10=O
SUMITOMO HEAVY INDUSTRIES
11/19/80
HC
MASS=2 / PM10=2
SUMITOMO HEAVY INDUSTRIES
11/19/80
HC
MASS=l 1 P1110=2
MPA
HC
MASS=O 1 PM10=1
08/21/75
SORI
CS HC
MASS=O ! PM10=38
12/05/73
BEE
HC
HASS=O / PM10=1
11/01/71
BEE
HC
MASS=O ! PM10=1
11/01/71
YORK RESEARCH
HC
MASS=2 I PM10=7
OS/21/75
IIFI
HC
!'IASS=O / PM10=5
06/08/77
UNKNOWN
HC
MASS=3 1 PM10=11
01/01/74
ENTROPY
HC
MASS=O 1 PM10=4
03/31/81
ENTROPY
HC
I'IASS=O / PM10=3
03/31/81
ENTROPY
HC
MASS=l 1 PM10=1
03/31/81
ENTROPY
HC
MASS=O / PM10=4
03/31/81
* FOR REPORT TYPE: CS = computer summary, HC = hard cOPY, PP = professional paper, and SR = summary report.
-------
09/30/88 LIST OF PARTICLE SIZE TEST REPORTS PAGE 6
IRON & STEEL
NAME/LQCATION TEST BY REPORT TYPE.
SOURCE DESCRIPTION DATE OF FIRST TEST RUN NO. OF RUNS
NATIONAL STEEL/ WEIRTON, WV ENTROPY HC
QUENCH TOWER 03/31/81 MASS=O / Ptl10=1
NOT SPECIFIED/ NOT SPECIFIED, PURDUE UNIV. PP
OPEN HEARTH FURNACE MASS=2 / PIHO=2
NOT SPECIFIED/ NOT SPECIFIED, UNKNOWN CS
OPEN HEARTH FURNACE Ob/lli74 MASS=5 / P1'I10=7
NOT SPECIFIED/ NOT SPECIFIED, IL KVB CS
OPEN HEARTH FURNACE l1l1817b HASS=O l PM10=1
NOT SPECIFIED/.LOS ANGELES, CA KVB CS HC
STEEL HEAT TREATING 11/29/77 HASS=O / P1'I10=2
NOT SPECIFIED/ LOS ANGELES, CA KVB CS HC
SINTER WINDBOX (ASSUMED) 02/02/78 MASS=O / PM10=2
NOT SPECIFIED/ LOS ANGELES, CA KVB CS HC
OPEN HEARTH FURNACE 03/21/78 MASS=O / PM10=2
PHOENIX STEEL/ PHOEHIXVILLE, PA BEE HC
SCARFING 12/12/73 MASS=1 " PM10=2
PLANT B/ NOT SPECIFIED, UNKNOWN HC
COKE OVEN PUSHING, BATTERY 3 12/05/74 MASS=2 / Ptl10=10
PLANT B/ NOT SPECIFIED, CLAYTON HC
SCARFING, SLABBING HILL 3 05/08/73 MASS=1 / Pr110=1
PLANT C/ NOT SPECIFIED, HPA HC
SINTER WIND BOX. 03/01/70 MASS=1 ! Pr110=1
PLANT C/ NOT SPECIFIED, MPA HC
SINTER WINDBOX 01i01/69 !'IASS= 1 / PI'I1 0= 1
REPUBLIC STEELi CLEVELAND, OH ACUREX HC
BOF CHARGING (HOT METAL) 06/14/79 MASS=2 / PIHO=1
REPUBLIC STEEL/ CLEVELAND, OH ACUREX HC
BOF TAPPING 06120/79 MASS=2 i PM10=1
REPUBLIC STEEL/ CLEVELAND, OH KOPPERS HC
COKE OVEN PUSHING, DURING PRE PUSH 11/28/79 MASS=O l Pi'110=1
. FOR REPORT TYPE: CS = cQmputer summary, HC = hard copy, PP = professional paper, and SR = summary report.
-------
09/30/88
LIST OF PARTICLE SIZE TEST REPORTS
IRON & STEEL
PAGE 7
NAME! L OCA TI ON
SOURCE DESCRIPTION
,
REPUBLIC STEEL! CLEVELAND, OH
COKE OVEN PUSHING, DURING PUSH
REPUBLIC STEEL! CLEVELAND,. OH
COKE OVEN PUSHING, DURING TRAVEL
REPUBLIC STEEL! S. CHICAGO, IL
BOF, HOT METAL TRANSFER TO
ROUGE STEEL COMPANY 1 DEARBORN, MI
BOF - OPEN HOOD (2)
SHENAGO INC.! NEVILLE ISLAND! PA
COKE OVEN UNDERFIRING, STACK 7 ON BATTERIES 2 & 3
USX/ CHICAGO! IL
SINTER WINDBOX, NO.3 PLANT
USXI CLAIRTON! PA
COKE OVEN PUSHING AND OVENJDOOR LEAKS, BATTERY 17
USX! CLAIRTON, PA
COKE OVEN PUSHING, CHEMICO CAR BATTERIES 19 & 20
USX! CLAIRTON, PA
COKE QUENCHING
USXJ FAIRLESS HILLS! PA
BLAST FURNACE CAST HOUSE NO.1! ROOF HONITOR
USXI GARY, IN
COKE QUENCHING! QUENCH TOWER 3 (OFFSET)
USV GARY, IN
COKE QUENCHING, QUENCH TOWER 5 (STRAIGHT)
USXJ LORAIN! OH
COKE QUENCHING, QUENCH TOWER 1, DIRTY QUENCH WATER
USX/ SAXONBURG, PA
SINTER WINDBOX, LINE 1
USX/ SAXONBURG, PA
SINTER WINDBOX, LINE 1
TEST BY
REPORT TYPE*
DATE OF FIRST TEST RUN
NO. OF RUNS
KOPPERS
HC
HASS=2 / P1110=3
11/28/79
KOPPERS
HC
I'IASS=O 1 PH10=1
11/28/79
ACUREX
HC
"ASS=1 / PM10=1
03/15/78
"PA
HC
t'lASS=1 / PMI0=3
06/07/87
BEE
HC
MASS=1 / PM10=2
07/12/76
BC"
HC
MASS=2 1 P\'I10=1
03/17/80
MPA
HC
I1ASS=O 1 PM10=4
11113/75
BCH
HC
MASS=O / PM10=1
03/24/81
MPA
HC
MASS=O / PI'II0=1
01101/67
BCH
HC
MASS=1 / PMI0=1
02/19/80
TRC
HC
MASS=O / PM10=6
11101/79
TRC
HC
MASS=O ! P1110=9
11101/79
YORK RESEARCH
HC
I1ASS=O / PM10=1
09/01/76
APOLLO CHEHICAL
HC
MASS=O / P1110=1
08/02/70
APOLLO CHEMICAL
HC
MASS=4 / PMI0=9
07/17178
* FOR REPORT TYPE: CS = computer summary, HC = hard copy, PP = professional paper, and SR = summary report.
-------
09/30/88 lIST OF PARTICLE SIZE TEST REPORTS PAGE 8
IRON & STEEL
NAME/lOCATION TEST BY REPORT TYpn
SOURCE DESCRIPTION DATE OF FIRST TEST RUN 1-10. OF RUNS
USXI SAXONBURG, PA COTTRELL HC
SINTER WINDBOX, LINE 1 10/03/79 HASS=2 1 Pl1l0=b
WISCONSIN STEELI CHICAGO, IL ACUREX HC
HOT KETAL TRANSFER 04/03/78 MASS=l 1 PMI0=1
WISCONSIN STEEL! CHICAGO, IL ACUREX HC
TEEMING 04/17/78 MASS=4 1 PMlO=2
* FOR REPORT TYPE: CS = computer summary, HC = hard copy, PP = professional paper, and SR = summary report.
-------
MINERAL PRODUCTS INDUSTRY
-------
09/30/88
LIST OF PARTICLE SIZE TEST REPORTS
MINERAL PRODUCTS INDUSTRY
PAGE 1
NAME/LOCATION
TEST BY
REPORT TYPE.
SOURCE DESCRIPTION
DATE OF FIRST TEST RUN
NO. OF RUNS
ALLIED PRODUCTS CO./ KONTEVALLO~ AL
110NSANTO RESEARCH
CS HC
MASS=O ! PMI0=0
ALLIED PRODUCTS CO./ MONTEVALLO, AL MONSANTO RESEARCH
ROTARY KILN 3 09/15/75
ALPHA PORTLAND CEKENT CO./ POWDERLY, AL SORI
CEMENT CLINKER COOLER 08/25/75
ANACONDA COPPER COMPANY/ BUTTE, KT ROY F. WESTON
COPPER, PRIMARY ORE CRUSHING 10/25/79
ANACONDA COPPER COI1PANY/ BUTTE, MT WESTON DES. & CONT.
COPPER TRUCK LOADOUT (TRUCK DUMP) 10/25/79
ANCHOR HOCKING/ LANCASTER, OH WESTON SERVICES
GLASS MELTING FURNACES, 11 & 3 TANKS ESP 07/21/78
ANCHOR HOCKING/ LANCASTER, OH WESTON SERVICES
GLASS MELTING FURNACES, 12 TANK ESP 07/18/78
ANCHOR HOCKING/ LANCASTER, OH WESTON SERVICES
GLASS MELTING FURNACES, 14 TANK ESP 07/20/78
ARKANSAS LIGHTWEIGHT AGGREGATE/ WEST MEMPHIS, AR PEDCO
CERAMIC/CLAY KILN 10/21/80
ARKANSAS LIGHTWEIGHT AGGREGATE/ WEST MEMPHIS, AR PEDCO
CERAMIC/CLAY CLINKER COOLER 10/21/80
ARKANSAS LIGHTWEIGHT AGGREGATE/ WEST MEMPHIS, AR PEDCO
CERAMIC/CLAY KILN 10/21/80
ARKANSAS LIGHTWEIGHT AGGREGATE/ WEST MEMPHIS, AR PEDCO
CERAMIC/CLAY CLINKER COOLER 10/21/80
BAGDAD COPPER/ BAGDAD, AZ SCOTT ENVIRONMENTAL
COPPER TRUCK LOAD OUT 11/ 16/79
BASIN ELECT. COOP. OLDS STN./ STANTON, ND ACUREX
COAL WASHING, UNIT 2 11/04/77
BOWEN CONSTRUCTION CO./ KANSAS CITY, MO MRI
DRUM-MIX ASPHALT PLANT 10/19/81
CS HC
KASS=3 / PHI0=3
CS
KASS=10 / P1110=41
CS
MASS=b / PMI0=4
CS
MASS=b / PMI0=4
He
!1ASS=2 i PMI0=2
HC
MASS=2 I PHI0=2
HC
MASS=2 / PMI0=2
CS
MASS=3 / P1110=8
CS
HASS=4 / P1110=8
es HC
I1ASS=4 / PMI0=8
CS HC
MASS=2 / PKI0=4
CS HC
I'IASS=9 / PMI0=4
es
MAS~=O / PMI0=2
CS
MASS=O ! PMI0=24
* FOR REPORT TYPE: CS = computer su~mary, HC = hard copy, PP = professional paper, and SR = summary report.
-------
09/30!88
LIST OF PARTICLE SIZE TEST REPORTS
MINERAL PRODUCTS INDUSTRY
PAGE 2
NAME/LOCATION
TEST BY
REPORT TYPO
SOURCE DESCRIPTION
DATE OF FIRST TEST RUN
tIC. OF RUNS
CERTAIN-TEED PRODUCTS CORPORATION! SHELBYVILLE, IN
FIBERGLASS INSULATION PLANT, ROTARY FORMING
BEE
09/20/73
HC
HASS=1 / P1'I10=1
CERTAIN-TEED PRODUCTS CORPORATION/ SHELBYVILLE, IN
FIBERGLASS INSULATION PLANT, ROTARY FURNACE NO. 45
BEE
09/18/73
HC
MASS=1 I PM10=1
CERTAIN-TEED PRODUCTS CORPORATIONI SHELBYVILLE, IN BEE
FIBERGLASS INSULATION PLANT, SUPERFINE FORMING NO. 11
09/13/73
HC
I1ASS=O l PM1 0= 1
CERTAIN-TEED PRODUCTS CORPORATION/ SHELBYVILLE, IN
FIBERGLASS INSULATION PLANT, SUPERFINE FURNACE NO.8
BEE
09/10/73
HC
MASS=2 l PM10=1
CLIMAX MOLYBDENUM CO.I SILVERTHORNE, CO
MOLYBDENUM DRYER MINE/MILL
YORK RESEARCH
08/23/81
CS
HASS=b I P1110=3
CLIMAX MOLYBDENUM CO./ SILVERTHORNE, CO
MOLYBDENUM PRIMARY CRUSHER
YORK RESEARCH
08/27/81
CS
HASS=15 / PH10=11
CLIMAX MOLYBDENUM CO.I SILVERTHORNE, CO
XOLYBDENUH PEBBLE SCREENING & MILLING'
YORK RESEARCH
08/29/81
CS
MASS=9 I P1'I10=10
COLUMBIA CEMENT CORP.I ZANESVILLE, OH
PORTLAND CEMENT KILN i5
BATTELLE COLUMBUS LAB.
HC .
MASS=O i P1110=2
CYPRUS BAGDAD COPPERI BAGDAD, AZ
COPPER, PRIMARY ORE CRUSHING
SCOTT ENVIRONMENTAL
11 f 12/79
CS HC
tlASS=6 I P1'I10=4
CYPRUS BAGDAD COPPER I BAGDAD, AZ SCOTT ENVIRONMENTAL
COPPER, PRIMARY ORE CRUSHING, CONVEYORS TO SECONDARY CRUSHER 11113/79
CS HC
tlASS=3 / PMI0=3
CYPRUS BAGDAD COPPER! BAGDAD, AZ SCOTT ENVIRONMENTAL
COPPER, PRIMARY ORE CRUSHING, SURGE BIN TO PRIMARY CRUSHER 11113/79
CS HC
MASS=3 / PM10=3
CYPRUS BAGDAD COPPER I BAGDAD, AZ
COPPER, SECONDARY CRUSHING
SCOTT ENVIRONMENTAL
11/14/79
CS HC
MASS=9 I P1110=3
CYPRUS BAGDAD COPPER I BAGDAD, AZ
COPPER, SECONDARY CRUSHINGIORE FEEDER
SCOTT ENVIRONMENTAL
W14i79
CS HC
MASS=O I PM10=4
EVELETH TACONITE CO.I EVELETH, MN
TACONITE BENEFICATION, INDURATION SYSTEM
U.S. EPA
WI8/7S
CS HC
MASS=5 I PMI0=5
EXXON MINERALS CO. USAI CASPER, NY
URANIUM REFINING
ROY F. WESTON
10/01/79
CS
tlASS=8 I PM10=7
t FOR REPORT TYPE: CS = computer summary, HC = hard copy, PP = professional paper~ and SR = summary report.
-------
09/30/88
LIST OF PARTICLE SIZE TEST REPORTS
MINERAL PRODUCTS INDUSTRY
PAGE 3
NAME/LOCATlOti
TEST BY
REPORT TYPE.
SOURCE DESCRIPTION
DATE OF FIRST TEST RUN
NO. OF RUNS
FMC CORP./ GREEN RIVER, NY
SODIUM CARBONATE CALCINING, MONO-5 CALCINER
YORK RESEARCH
05/17/79
CS HC
MA5S=6 / PMI0=2
FMC CORP./ GREEN RIVER, WY
SODIUM CARBONATE DRYER NS-6
YORK RESEARCH
05/18/79
CS HC
I'IASS=6 / PI'II0=3
FMC CORP. I GREEN RIVER, NY
SODIUM CARBONATE CALCINER NS-3
YORK RESEARCH
05/19/79
CS HC
MASS=6 I PM10=4
G & WH CORSON I PLYMOUTH MEETING, PA
VERTICAL SHAFT LIME KILN 11
JACA
10/31/73
HC
MASS=1 / PMI0=1
GEORGIA KAOLIN CO.I DRY BRANCH, GA
KAOLIN MILLING, RAYMOND IMPACT MILL 8
ROY F. WESTON
12106/78
CS
MASS=4 I Pi'l10=1
GEORGIA KAOLIN CO./ DRY BRANCH, GA
KAOLIN MILLING, RAYMOND IMPACT MILL
ROY F. WESTON
12/06/78
CS
MA5S=4 I PMI0=1
GEORGIA KAOLIN CO./'DRY BRANCH, GA
KAOLIN HILLING, RAYI'IOND MILL IMPACT MILL NO.8
ROY F. WESTON
12/06/78
CS
MASS=4 i PM10=1
GEORGIA KAOLIN CO./ DRY BRANCH, GA
KAOLIN MILLING ROLLER MILL
ROY F. WESTON
12/05/78
CS
MASS=4 I PIUO=1
GOLD BOND BUILDING PROD. I WILMINGTON, NC
GYPSUM PRODUCTS, NO.2 CALCIDYNE UNIT
ROY F. WESTON
05/19/80
CS HC
MASS=6 / PM10=4
GOLD BOND BUILDING PROD. 1 WILMINGTON, NC
GYPSUM PRODUCTS, ROCK DRYER
ROY F. WESTON
05/21/80
CS HC
I1ASS=6 / PM10=4
GOLD BOND BUILDING PROD. I RICHMOND, CA
WALLBOARD MANUFACTURE, DIRECT CONTACT CALCINER
YORK RESEARCH
07/15/80
CS HC
MASS=6 / PMI0=4
H & B DRYER I NOT SPECIFIED,
ASPHALT BATCHING
SORI
10/15/74
CS
I'IASS=4 I PMI0=25
HOMESTAKE GOLD MINEI LEAD, SD
GOLD ORE PROCESSING
YORK RESEARCH
01/16/80
CS HC
I'IASS=12 1 PMI0=B
IDEAL BASIC CEMENT CO./ ADA, OK
CEMENT KILN
MRI
05/01lB1
CS
MASS=16 I PMI0=24
KERR-MCGEE I TRONA, CA
POTASH PROCESSING, MURIATE DRYER 1
SCOTT ENVIRONMENTAL
07/10/79
CS
t1ASS=8 / PMI0=6
. FOR REPORT TYPE: CS = computer summary, HC = hard copy, PP = professional paper, and SR = summary report.
-------
09/30/88
LIST OF PARTICLE SIZE TEST REPORTS
MINERAL PRODUCTS INDUSTRY
PAGE 4
NAME/LOCATION
REPORT TYPH
TEST BY
SOURCE DESCRIPTION
DATE OF FIRST TEST RUN
NO. OF RUNS
KERR-MCGEE! TRONA, CA
POTASH PROCESSING, POTASSIUM SULFATE DRYER
SCOTT ENVIRONMENTAL
07/13/79
CS
MASS=3 / PM10=1
KERR-MCGEE! TRONA, CA SCOTT ENVIRONMENTAL
SODIUM CARBONATE DRYER, COMBINED CYCLONE 1 & 2 EXHAUST 07/19/79
KERR-MCGEE/ TRONA, CA
SODIUM CARBONATE DRYER, ROTARY PREDRYER CYCLONE 1
KERR-MCGEE/ TRONA, CA
SODIUM CARBONATE DRYER, ROTARY PREDRYER CYCLONE 2
KERR-MCGEE/ TRONA, CA
SODIUM CARBONATE DRYER, BLEACHER DRYER CYCLONE 1
KERR-MCGEE/ TRONA, CA
SODIUM CARBONATE DRYER, BLEACHER DRYER CYCLONE 2
KERR-MCGEE/ TRONA, CA
SODIUM CARBONATE DRYER, COMBINED CYCLONE EXHAUST
KERR-MCGEE/ TRONA, CA
POTASH PROCESSING, MURIATE DRYER 1
KERR-MCGEE! TRONA, CA
POTASSIUM SULFATE DRYER
LEE BRICK & TILE CO./ SANFORD, NC
BRICK MANUFACTURE, DRYER AND KILN EFFLUENT
LEE BRICK & TILE CO./ SANFORD, NC
BRICK MANUFACTURE, SOUTH KILN STREAM
MONARCH CEMENT CO./ HUMBOLDT, KS
CEMENT KILN
N.J. ZINC CO. - STERLING MINE/ OGDENSBURG, NJ
ZINC MINE/MILL - ORE PROCESSING
NEW JERSEY ZINC CO./ 06DENSBURG, NJ
ZINC MINE/MILL - ORE DRYER
NOT SPECIFIED/ NOT SPECIFIED,
GLASS MELTING FURNACE
CS HC
I1ASS=3 / PM10=1
SCOTT ENVIRONMENTAL
07/19/79
CS HC
MASS=3 / PM10=3
SCOTT ENVIRONMENTAL
07/19/79
CS HC
i'lASS=5 / P1'I10=4
SCOTT ENVIRONMENTAL
07/17/79
CS HC
MASS=4 / PM10=2
SCOTT ENVIRONMENTAL
07/17/79
CS HC
I1ASS=4 / PH10=2
SCOTT ENVIRONMENTAL
07/17/79
CS HC
MASS=1 ,. PM10=1
SCOTT ENVIRONMENTAL
04/18/79
CS HC
MASS=5 1 PIHO=4
SCOTT ENVIRONMENTAL
04/19.179
CS HC
MASS=3 / PM10=1
CLAYTON
CS HC
MASS=12 / PM1Q=2
01/10/80
CLAYTON
CS HC
MASS=4 1 PMI0=2
01/11/80
MRI
CS
MASS=O 1 PMI0=21
11/12/81
YORK RESEARCH
CS HC
MASS=18 / PM1Q=16
12/03/79
YORK RESEARCH
CS HC
MASS=O I P1110=4
11/21/79
BATTELLE COLUMBUS LAB.
HC
MASS=O I FM10=3
i FOR REPORT TYPE: CS = computer summary, HC = hard copy, PP = professional paper! and SR = summary report.
-------
09/30/88 LIST OF PARTICLE SIZE TEST REPORTS PAGE 5
MINERAL PRODUCTS INDUSTRY
NAI'IE/LOCATION TEST BY REPORT TYPE*
SOURCE DESCRIPTION DATE OF FIRST TEST RUN NO. OF RUNS
NOT SPECIFIEDI NOT SPECIFIED, CA U.S. EPA CS
COTTON GWNING I'IASS=O 1 PM10=2
NOT SPECIFIEDI NOT SPECIFIED, APT INC. CS
SALT DRYERS (TWO) MASS=O ! PM10=16
NOT SPECIFIEDI NOT SPECIFIED, APT INC. CS
ROTARY SALT DRYER MASS=O 1 PM10=11
NOT SPECIFIEDI NOT SPECIFIED, APT INC. CS HC
BORAX FUSING FURNACE 08/18176 I'IASS=O ! PMI0=2S
HOT SPECIFIEDI NOT SPECIFIED, SORI CS
ROCK WOOL PRODUCING PLANT 05/31/73 HASS=O 1 PM10=8
NOT SPECIFIEDI BIRI'IINGHAI'I, AL SORI CS
MINERAL WOOL CUPOLA 06/13i73 HASS=O ! P1'I10=7
NOT SPECIFIEDI NOT SPECIFIED, KVB CS
CEMENT KILN 05/06/76 MASS=1 1 P1110=1
NOT SPECIFIEDI NOT SPECIFIED, TX KVB CS
CEMENT KILN 08/11176 MASS=2 1 PM10=2
NOT SPECIFIEDI NOT SPECIFIED, TX KVB CS
CEMENT KILN 09/29176 MASS=O I PM10=4
NOT SPECIFIEDI LOS ANGELES, CA KVB CS HC
GYPSUM PRODUCTS, CALCINING KETTLE 10/18/77 MASS=O 1 P1'I10=1
NOT SPECIFIEDI LOS ANGELES, CA KVB CS HC
BRICK MANUFACTURE 11/03/77 I1ASS=O 1 PM10=2
NOT SPECIFIEDI LOS ANGELES, CA KVB CS He
PORTLAND CEMENT ROTARY KILN 12/16/77 MASS=O 1 P1'110=1
NOT SPECIFIEDI LOS ANGELES, CA KVB HC
GLASS PRODUCTS 01112/77 MASS=O ! PM10=2
NOT SPECIFIEDI LOS ANGELES, CA KVB HC
GLASS FURNACE 02116/78 I'IASS=O 1 PI'UO=l
NOT SPECIFIEDI LOS ANGELES, CA KVB HC
GLASS REGENERATIVE FURNACE 03/1b/78 MASS=O 1 PM10=2
* FOR REPORT TYPE: CS = computer summary, HC = hard copy, PP = professional paper, and SR = summary report.
-------
09/30/88 LIST OF PARTICLE SIZE TEST REPORTS PAGE 6
MINERAL PRODUCTS INDUSTRY
NAME/LOCATION TEST BY REPORT TYPE8
SOURCE DESCRIPTION DATE OF FIRST TEST RUN NO. OF RUNS
NOT SPECIFIED/ LOS ANGELES, CA KVB CS HC
FIBERGLASS WOOL MANUFACTURE 03/28/78 MASS=O I PM10=2
NOT SPECIFIEDI LOS ANGELES, CA KVB CS HC
ASPHALT MANUFACTURING PROCESS 01/31/78 MASS=O I P1'I10=1
PFIZER INC.I GIBONSBURG, OH /'IRI CS
LIME CONVEYOR 12/03/80 MASS=17 I PMI0=15
SHERWIN PLANT I CORPUS CHRISTI, TX ROY F. WESTON CS HC
ORE BINS 06/25/80 I'IASS=6 I PMI0=2
SHERWIN PLANT I CORPUS CHRISTI, TX ROY F. WESTON CS
SHIP UNLOADING-BAUXITE 06/24/80 MASS=1 / P1110=1
TOI1BIGBEE LIGHTWEIGHT AGGREGATE CO. I LIVINGSTON, AL SORI CS
CLAY DRYER 02/14/73 I'IASS=O 1 PMI0=5
UNION CARBIDEI HOT SPRINGS, AR SCOTT ENVIRONMENTAL CS HC
VANADIUM DRYING ORE KILN 12/06/79 HASS=19 / PMI0=12
UNION CARBIDEI HOT SPRINGS, AR SCOTT ENVIRONMENTAL CS HC
GRINDING VANADIUM 12/01179 MASS=7 / PMI0=6
UNION CARBIDEI HOT SPRINGS, AR SCOTT ENVIRONMENTAL CS
VANADIUM DRYER, COARSE ORE 12/06/79 MASS=19 / PM10=12
UNION CARBIDEI HOT SPRINGS, AR SCOTT ENVIRONMENTAL CS
VANADIUM MINE/MILL, COARSE ORE GRINDER 12/05li9 MASS=b I PM10=6
UNITED NUCLEAR CORPORATIONI CHURCHROCK, NM U.S. EPA HC
URANIUM MILL DRYER STACK 05/16/79 MASS=O I PM10=1
UNITED NUCLEAR CORPORATIONI CHURCHROCK, NM U.S. EPA HC
URANIUM MILL PACKAGING STACK 05/16/79 MASS=O i PM10=1
US GYPSUM CO./ SHOALS, IN ROY F. WESTON CS HC
GYPSUM PRODUCTS, ROTARY ROCK DRYER 06105/80 MASS=6 I P1110=4
US GYPSUM CO.I SHOALS, IN ROY F. WESTON CS HC
WALLBOARD MANUFACTURE, BOARD END SAWING 06105/80 MASS=3 I PMI0=1
VULCAN MATERIALS COI BESSEMER, AL PEDCO HC
CLINKER & COOLER 07/14/81 I1ASS=2 / PM10=4
* FOR REPORT TYPE: CS = computer summary, HC = hard copy, PP = professional paper, and SR = summary report.
-------
09/30/88
LIST OF PARTICLE SIZE TEST REPORTS
MINERAL PRODUCTS INDUSTRY
PAGE 7
NAME/LOCATION
TEST BY
REPORT TYPEt
SOURCE DESCRIPTION
DATE OF FIRST TEST RUN
NO. OF RUNS
VULCAN i'lATERIALS COI BESSEi'lER, AL
COAL FIRED ROTARY KILN 11
PEDCO
07l15/B1
HC
i'lASS=2 I P!HO=4
W. R. GRACE & COi'lPANY/ BARTOW! FL
PHOSPHATE ROCK, ROTARY AND FLUID BED DRYER SYSTEM
ENGINEERING SCIENCE
03/24/75
CS HC
MASS=6 I PM10=2
WHITEHALL CEMENT MFG CO.I WHITEHALL, PA
CEI'IENT KILN 113
6IlBERTASSOCIATES
09/09/75
HC
HASS=3 I PM10=6
. FOR REPORT TYPE: CS = computer summary, HC = hard copy! PP = professional paper, and SR = summary report.
-------
NONFERROUS METALS INDUSTRY
-------
09/30/88
LIST OF PARTICLE SIZE TEST REPORTS
NONFERROUS METALS INDUSTRY
PAGE 1
NAME/LOCATION
TEST BY
REPORT TYPEt
SOURCE DESCRIPTION
DATE OF FIRST TEST RUN
NO. OF RUNS
ANACONDA COPPER COMPANY 1 BUTTE, MT
ROY F. WESTON
CS
MASS=O 1 PM10=0
ANACONDA COPPER COMPANY 1 BUTTE, MT
COPPER REFINING, GRIZZLEY & PRIMARY CRUSHER
ROY F. NESTON
10/25/79
CS
HASS=b 1 PM10=4
ANACONDA COPPER COMPANY 1 BUTTE, HT
COPPER REFINING, GRIZZLEY EAST
ROY F. WESTON
10/25/79 .
CS
MASS=3 1 PM10=3
ANACONDA COPPER COMPANY 1 BUTTE, MT
COPPER REFINING, PRIMARY CRUSHER
ROY F. WESTON
10/25/79
CS
MASS=3 ! PM10=3
ANACONDA COPPER COMPANY 1 BUTTE, MT
COPPER REFINING, TRUCK DUMP
ROY F. NESTON
10/25/79
CS
MASS=b 1 PH10=4
ASARCOI TACOHA, NA
ROASTERS AND ARSENIC PLANT
WA DEPT ECOLOGY
01/23/75
HC
MASS=O 1 P~11 0=3
ASARCOI TACOMA, triA
VARIOUS COPPER SHELTER OPERATIONS, ESP 1
ENVIRONMENTAL SERVICES
02/01/76
HC
HASS=O l PM10=2
ASARCOI EL PASO, TX TRW
COPPER SHELTER, BAGHOUSE ON CONVERTER, BLDG. FUGITIVES
01119/78
HC
MASS=2 / PH10=8
ASARCOI EL PASO, TX TRW
COPPER SHELTER, CALCINING PROCESS FUGITIVE EMISSIONS.
01/27178
HC
MASS=1 1 PM10=4
ASARCOI TACOMA, IIA
COPPER SMELTING, ROASTER/REVERBERATOR
U.S. EPA
09/27/73
CS HC
MASS=2 1 PM10=1
ASARCOI TACOMA, NA
COPPER SMELTING, CONVERTER
U.S. EPA
09/26/73
CS HC
MASS=2 1 PM10=2
ASARCOI NOT SPECIFIED, WA
COPPER SMELTING
WASH. DEPT. OF ECOLOGY
01120/75
CS
MASS=O / PM10=4
ASARCOI NOT SPECIFIED, WA
COPPER SHEL TlNG
WASH. DEPT. OF ECOLOGY
CS
MASS=O 1 P1'\10=3
ABARCOI GLOVER, MO
LEAD BLAST FURNACE
BATTELLE COLUMBUS LAB.
04/30/75
CS HC
MASS=3 1 PH10=5.
EXXON MINERALS CO. USA 1 CASPER, NY
URANIUM REFINING, PRIMARY CRUSHER
ROY F. HESTON
09127/79
CS
HASS=12 1 PMI0=10
i FOR REPORT TYPE: CS = computer summary, HC = hard copy, PP = professional paper, and SR = summary report.
-------
09/30/88
LIST OF PARTICLE SIZE TEST REPORTS
NONFERROUS METALS INDUSTRY
PAGE 2
NAME/LOCATION
TEST BY
REPORT TYPE'
SOURCE DESCRIPTION
DATE OF FIRST TEST RUN
NO. OF RUNS
EXXON MINERALS CO. USAI CASPER, NY ROY F. WESTON
URANIU" REFINING, FINE ORE BINS 09128/81
GOULD, INC.I ST. PAUL, MN MONSANTO RESEARCH
LEAD CALCINING FURNACE 08/29/73
ILA. LILLEBY SMELTEVEVKE A/SI TRONDHEI", NORWAY, NORWEGIAN INSTITUTE TECH.
FESI OPEN SUBMERGED-ARC FURNACE 07/09/70
KAISER MEADEJ NOT SPECIFIED, WASH. DEPT. OF ECOLOGY
ALUMINU" ELECTROLYTIC PROD. 02J18/7b
KENNECOTT COPPER CORP.I MCGILL, NV U.S. EPA
MAIN STACK OF COPPER SMELTER 12/13/79
KENNECOTT COPPER CORP.I "CGILL, NV PEDCO
CONVERTER OFF-GASES
KENNECOTT COPPER CORP.J "CGILL, NV PEDCO
REVERBERATORY FURNACES
KENNECOTT COPPER CORP. I MCGILL, NV RESEARCH COTTRELL
CONVERTER
KENNECOTT COPPER CORP. I "CGILL, NV RESEARCH COTTRELL
REVERBERATORY FURNACE
MOLYCORP, INC. I WASHINGTON, PA RADIAN
MULTI-LEVEL HEARTH MOLYBDENUM ROASTER Ob/23178
NEW JERSEY ZINC CO.I PALMERTON, PA PURDUE UNIV.
ZINC VERTICAL RETORT, BATTERY E Ob121/73
NEW JERSEY ZINC CO.I PALMERTON, PA PURDUE UNIV.
ZINC RETORT FURNACE E 03128/74
NOT SPECIFIEDi NOT SPECIFIED, PURDUE UNIV.
ZINC SHELTER, COKER
NOT SPECIFIEDI NOT SPECIFIED, PURDUE UNIV.
ZINC SMELTER, SINTERING
NOT SPECIFIEDI NOT SPECIFIED, PURDUE UNIV.
ZINC SHELTER, VERTICAL RETORT
CS
I'IASS=9 I PH10=7
CS HC
HASS=7 I P1110=b
PP
MASS=O I PMI0=2
CS
MASS=Q I PM10=2
HC
MASS=Q / P!'IIQ=1
HC
MASS=Q I PM10=2
HC
MASS=O I P1'I10=2
HS
I'IAS5=0 I PM10=2
HS
MASS=O / PM10=4
HC
MASS=2 I PM10=5
CS
HASS=1 I PM10=1
CS
MASS=3 I PM10=3
PP
MASS=1 I PH10=1
PP
MASS=1 / P"10=1
PP
MASS=1 I PM10=1
. * FOR REPORT TYPE: CS = computer summary, HC = hard copy, PP = professional paper, and SR = summary report.
-------
09/30/88
LIST OF PARTICLE SIZE TEST REPORTS
NONFERROUS KETALS INDUSTRY
PAGE 3
NAME/LOCATION
TEST BY
REPORT TYPE'
SOURCE DESCRIPTION
DATE OF FIRST TEST RUN
NO. OF RUNS
NOT SPECIFIEDI NOT SPECIFIED, U.S. EPA
11 NC ROASTI NG
NOT SPECIFIEDI NOT SPECIFIED, U.S. EPA
COPPER SHEL TING
NOT SPECIFIEDI NOT SPECIFIED, U.S. EPA
ZINC SINTERING
NOT SPECIFIEDI NOT SPECIFIED, U.S. EPA
LEAD SINTERING
NOT SPECIFIEDI NOT SPECIFIED, U.S. EPA
LEAD BLAST FURNACE
NOT SPECIFIEDI NOT SPECIFIED, M. W. KELLOGG CO.
ALUMINUM ELECTROLYTIC POT LINE 08/20/74
NOT SPECIFIEDI NOT SPECIFIED, TRC
NONFERROUS RECOVERY PLANT 05/06/76
NOT SPECIFIEDI LOS ANGELES, CA KVB
ALUMINUM REVERB FURNACE 11/10/77
PHELPS-DODGE I AJO, AZ SORI
COPPER REVERBERATORY FURNACE 07/09/76
PHELPS-DODGE I PLAYAS, NM TRW
SECONDARY CONVERTER HOODING SYSTEM 07/24/78
PHELPS-DODGEI NOT SPECIFIED, SORI
COPPER SMELTING, REVERBATORY FURNACE 07/09/76
PHELPS-DODGE I PLAYAS, NH TRW
COPPER SMELTING, CONVERTER, SECONDARY HOODING 0712b/78
REYNOLDS LONGVIEWI NOT SPECIFIED, WA DEPT ECOLOGY
ALUMINUM ELECTROLYTIC PROD. 03/09/76
U.S. DEPT. OF ENERGY - FMPCI CINCINNATI, OH NLO, INC.
PLANT 4, DUST COLLECTOR G4-12
U.S. DEPT. OF ENERGY - FHPCI CINCINNATI, OH ~ILO, INC.
PLANT 4, DUST COLLECTOR G4-14
CS
\'1ASS=O I Pi'l10=4
CS
KASS=O I P1'\10=4
CS
MASS=O I PI'Il 0= 2
CS
MASS=O I PM10=2
CS
MASS=1 I P\'110=2
CS
HASS=8 I PH10=15
CS
MASS=O I PI'Il (1= 2
CS HC
MASS=O I Pi'l10=2
HC
I'IASS=2 I PM10=2
HC
HASS=O I P1'110=3
CS
HASS=O I P1'I10=7
CS HC
I'1ASS=O / PM10=3
CS
KASS=O / P!110=3
HC
HASS=O I PH10=2
HC
MASS=O I Pi'llO=2
. FOR REPORT TYPE: CS = computer sum.ary, HC = hard copy, PP = professional paper, and SR = summar v report.
-------
09i30/BB
LIST OF PARTICLE SIZE TEST REPORTS
NONFERROUS METALS INDUSTRY
PAGE 4
NAME/LOCATION
REPORT TYPE*
TEST BY
SOURCE DESCRIPTION
NO. OF RUNS
DATE OF FIRST TEST RUN
U.S. DEPT. OF ENERGY - FMPC/ CINCINNATI, OH
PLANT 4, DUST COLLECTOR G4-2
U.S. DEPT. OF ENERGY - FMPC/ CINCINNATI, OH
PLANT 4, DUST COLLECTOR 64-5
U.S. DEPT. OF ENERGY - FHPC/ CINCINNATI, OH
PLANT 4, DUST COLLECTOR G4-7
U.S. DEPT. OF ENERGY - FMPC/ CINCINNATI, OH
PLANT 5, DUST COLLECTOR G5-249
U.S. DEPT. OF ENERGY - FMPC/ CINCINNATI, OH
PLANT 5, DUST COLLECTOR G5-250
U.S. DEPT. OF ENERGY - FMPC/ CINCINNATI, OH
PLANT S, DUST COLLECTOR 65-251
U.S. DEPT. OF ENERGY - FMPC/ CINCINNATI, OH
PLANT 5, DUST COLLECTOR G5-253
U.S. DEPT. OF ENERGY - FMPCI CINCINNATI, OH
PLANT 5, DUST COLLECTOR 65-254
U.S. DEPT. OF ENERGY - FMPCI CINCINNATI, OH
PLANT 5, DUST COLLECTOR G5-256
U.S. DEPT. OF ENER6Y - FHPC/ CINCINNATI, OH
PLANT 5, DUST COLLECTOR 65-260
U.S. DEPT. OF ENERGY - FMPC/ CINCINNATI, OH
PLANT a, DUST COLLECTOR 643-27
U.S. DEPT. OF ENERGY - FMPCI CINCINNATI, OH
PLANT 9, DUST COLLECTOR 69NI~1039, REMELT FURNACE
U.S. DEPT. OF ENERGY - FMPCI CINCINNATI, OH
URANIUM PROCESSING, CRUCIBLE BURNOUT, G5-261
VISTA METALS CORP./ FONTANA, CA
ALUMINUM REVERB FURNACE, CHLORINATION CHANBER
VISTA METALS CORP./ FONTANA, CA
ALUMINUM REVERB FURNACE
NLO, INC.
HC
NASS=O 1 PIUO=2
NLO, INC.
HC
I'IASS=O / P1110=2
NLO, INC.
HC
MASS=O 1 PH10=2
NLO, INC.
HC
MSS=O I PM10=2
. NlO, INC.
HC
MASS=O I P1110=2
NLO, INC.
HC
MASS=O I PM10=2
NLO, INC.
HC
MASS=O I P1110=2
NLO, INC.
HC
MASS=O I PM10=2
NLO, INC.
HC
MASS=!) 1 P1110=2
NLO, INC.
HC
MASS=O ! P1'\10=2
NlO, INC.
HC
I'IASS=O I Pi'l10=2
NLO, INC.
HC
MASS=O / P1I10=2
NLO, INC.
HC
MASS=O / P1'\10=2
ENGINEERING SCIENCE
05/1B/B1
CS HC
MASS=6 I P1110=6
ENGINEERING SCIENCE
O~I/1B/B1
CS HC
MASS=6 I P1110=6
* FOR REPORT TYPE: CS = computer summary, HC = hard copy, PP = professional paper, and SR = summary report.
-------
PETROLEUM INDUSTRY
-------
09/30/88 lIST OF PARTICLE SIZE TEST REPORTS PAGE !
PETROLEUM INDUSTRY
NAME/lOCATION TEST BY REPORT TYPEt
SOURCE DESCRIPTION DATE OF FIRST TEST RUN NO. OF RUNS
AMOCO OIL COMPANY 1 WHITING, IN STEARNS - ROGER HC
MASS=O 1 PM10=0
AMOCO OIL COMPANY 1 WHITING, IN STEARNS - ROGER HC
FLUIDIZED BED CATALYTIC CRACKING, UNIT 500 05/16179 /'IASS=1 / P1110=b
AMOCO OIL COMPANY 1 WHITING, IN STEARNS - ROGER HC
FLUIDIZED BED CATALYTIC CRACKING, UNIT 600 05/21179 MASS=! 1 PM!0=4
NOT SPECIFIEDI lOS ANGELES, CA KVB CS HC
ASPHALT PAVING & ROOFING 02/21/78 /'IASS=O ! 1'1'110=2
NOT SPECIFIED! LOS ANGELES, CA KVB CS HC
REFINERY HEATER, HEAVY FUEL OILS 04/04178 . /'IASS=O l 1'/'110=1
NOT SPECIFIEDI LOS ANGELES, CA KVB CS HC
GA~OLINE CRACKING 04/18/78 HASS=O 1 PM10=!
* FOR REPORT TYPE: CS = computer summary, HC = hard copy, PP = professional paper, and SR = summary report.
-------
SOLID WASTE DISPOSAL
-------
09/30/88
LIST OF PARTICLE SIZE TEST REPORTS
SOLID WASTE DISPOSAL
PAGE 1
NAME/LOCATION
TEST BY
REPORT TYPE.
SOURCE DESCRIPTION
DATE OF FIRST TEST RUN
NO. OF RUNS
CENTRAL WAYNE CNTY SANITATION AUTH./ DEARBORN HEIGHTS, ENGINEERING SCIENCE
HC
MASS=O / PM10=0
CENTRAL WAYNE CNTY SANITATION AUTH./ DEARBORN HEIGHTS, ENGINEERING SCIENCE
INCINERATION UNIT 12 . 06/22/82
HC
MASS=1 / P1110=3
CITY OF EAST CHICAGO/ EAST CHICAGO, IN
MUNICIPAL INCINERATOR
PURDUE UNIV.
PP
HASS=1 / P1110=1
DEPT. OF PUBLIC WORKS/ INDIANAPOLIS, IN
UNIT NO.9
ALMEGA CORP.
06/30/87
HC
IIASS=4 / P1110=8
DETROIT WATER & SEWAGE DEPT./ DETROIT, 111
MULTI-HEARTH SLUDGE INCINERATOR, NO. 13
PEl
06/18/85
HC
/'IASS=2 / PM10=2
DETROIT WATER & SEWAGE DEPT./ DETROIT, MI
MUNICIPAL SLUDGE INCINERATOR 113
ENV. INSTRUMENT SYSTEMS
06/13/80
HC
MASS=2 / PM10=3
DETROIT WATER & SEWAGE DEPT./ DETROIT, MI
MUNICIPAL SLUDGE INCINERATOR 15
ENV. INSTRUMENT SYSTEMS
06/23/80
HC
MASS=4 / PIH 0=3
HARRISBURG MUNICIPAL INCINERATOR/ HARRISBURG, PA
INCINERATOR, UNIT 1
SORI
05/08/73
CS HC
MASS=O / PM10=10
JOHN D. NICOSIA MUNICIPAL INCINER./ EAST CHICAGO, IN PURDUE UNIV.
REFUSE INCINERATOR
PP
MASS=O / PM10=1
METROP. WASTE CTRL COMI1, SENECA/ ST. PAUL, MN
NO.2 SLUDGE INCINERATOR
INTERPOLL
09/18/81
HC
MASS=2 / PM10=3
MILWAUKEE METROPOL. SEWERAGE DISTR./ MILWAUKEE, WI
SLUDGE DRYING SYSTEM, UNIT 7, CYCLONE
CLEAN AIR ENGINEERING
10/12/87
HC
MASS=2 / PH10=7
NORFOLK NAVAL SHIPYARD/ PORTSMOUTH, VA
REFUSE-FIRED BOILER 12 AT BUILDING 1460
U.S. NAVY
07/06/83
HC
tIASS=O i PM10=3
RICHARDS ASPHALT PLANT/ SAVAGE, MN
BRULE REFUSE INCINERATOR WITH WASTE HEAT BOILER
INTERPOLL
04/27/83
HC
MASS=2 / PM10=1
SUMNER COUNTY/ GALLATIN, TN
ROTARY COMBUSTOR/BOILER
COOPER ENGINEERS, INC.
02/09/83
HC
MASS=2 / P/'I10=9
* FOR REPORT TYPE: CS = computer summary, HC = hard copy, PP = professional paper, and SR = summary report.
-------
STORAGE BATTERY PRODUCTION
-------
09.130/88 LIST OF PARTICLE SIZE TEST REPORTS PAGE 1
STORAGE BATTERY PRODUCTION
NAMElLOCATION TEST BY REPORT TYPH
SOURCE DESCRIPTION DATE OF FIRST TEST RUN NO. OF RUNS
GLOBE UNION INC./ CANBY, ON EKB CS
I'IASS=O / PM10=O
GLOBE UNION INC.I CANBY, ON EMB CS
LEAD BATTERIES, PASTE MIXING OPERATION 06/18176 I'IASS=O 1 PI'II0=6
GLOBE UNION INC.I CANBY, ON EMB CS
LEAD BATTERIES, PASTE MIXING OPERATION 06/18176 I'IASS=O 1 PI'U 0= 5
GLOBE UNION INC./ CANBY, ON EKB CS
LEAD BATTERIES, PASTE I'IIXIN6 OPERATION 06/17176 KASS=O 1 PM10=3
* FOR REPORT TYPE: CS = computer summary, HC = hard copy, PP = professional paper, and SR = summary report.
-------
WOOD PRODUCTS INDUSTRY
-------
09/30/BB LIST OF PARTICLE SIZE TEST REPORTS PAGE 1
WOOD PRODUCTS INDUSTRY
NAME/LOCATION TEST BY REPORT TYPEt
SOURCE DESCRIPTION DATE OF FIRST TEST RUN NO. OF RUNS
CHAMPION BUILDING PRODUCTSI GAYLORD, MI RAttCON HC
PlASS=O 1 PM10=0
CHAMPION BUILDING PRODUCTSI GAYLORD, ttI RAttCON HC
PARTICLE BOARD PLANT, DRYER STACK . 07/20/79 MASS=2 1 PM10=5
CHAMPION BUILDING PRODUCTS 1 GAYLORD, MI ENVIRODYNE ENGINEERS, INC. HC
PARTICLE BOARD PLANT, CM GLUE DECK 01105/79 MASS= 1 1 PI'I1 0=0
CHAMPION BUILDING PRODUCTSI GAYLORD, HI ENVIRODYNE ENGINEERS, INC. HC
PARTICLE BOARD PLANT, Ctt GLUE DECK. 01105/79 MASS=O 1 PM10=1
CHAMPION BUILDING PRODUCTS 1 GAYLORD, MI ENVIRODYNE ENGINEERS, INC. HC
PARTICLE BOARD PLANT, FLASH DRYER 01/05/79 MASS=4 1 PM10=4
CHAMPION BUILDING PRODUCTS 1 GAYLORD, MI ENVIRODYNE ENGINEERS, INC. HC
PARTICLE BOARD PLANT, JET DRYER 01/05/79 HASS=4 1 PHI0=3
CHAMPION BUILDING PRODUCTS 1 GAYLORD, MI ENVIRODYNE ENGINEERS, INC. HC
PARTICLE BOARD PLANT, Nb COMMON DRYER STACK 01/05i79 MASS=! 1 P/'II0=0
CHAMPION BUILDING PRODUCTSI GAYLORD, MI ENVIRODYNE ENGINEERS, INC. HC
PARTICLE BOARD PLANT, Nb COttMON DRYERSTACK 01105/79 HASS=O 1 PM10=1
CHAMPION BUILDING PRODUCTSI GAYLORD, MI ENVIRODYNE ENGINEERS, INC. HC
PARTICLE BOARD PLANT, TM DRYER 01/05/79 MASS=! 1 PMI0=1
CHAMPION BUILDING PRODUCTSI GAYLORD, MI ENVIRODYNE ENGINEERS, INC. HC
PARTICLE BOARD PLANT, TM GLUE DECK 01/05/79 I'IASS=1 1 PM10=0
CHAMPION BUILDING PRODUCTSI GAYLORD, I'll ENVIRODYNE ENGINEERS, INC. HC
PARTICLE BOARD PLANT, TM GLUE DECK. 01/05/79 /'IASS=O 1 PM10=1
CHAMPION BUILDING PRODUCTSI GAYLORD, MI ENVIRODYNE ENGINEERS, INC. HC
PARTICLE BOARD PLANT, TM SILO GLUE DECK 01/05/79 MASS=1 1 PMI0=1
CHAMPION BUILDING PRODUCTSI GAYLORD, I'll SWANSON HC
PARTICLE BOARD PLANT, N-b DRYER 07/1bl80 MASS=1 1 PM10=1
CHAI'IPION BUILDING PRODUCTSI GAYLORD, MI SWANSON HC
DRYER STACK AT THE N-b PARTICLE BOARD PLANT 07/1B/BO MASS= 1 1 PI!! 0= 1
CHAMPION BUILDING PRODUCTS 1 GAYLORD, HI SWANSON HC
N-b FURNACE STACK 07/30/81 MASS=O 1 PMI0=2
* FOR REPORT TYPE: CS = computer summary, HC = hard copy, PP = professional paper, and SR = summary report.
-------
09/30/88 LIST OF PARTICLE SIZE TEST REPORTS PAGE 2
WOOD PRODUCTS INDUSTRY
NAME/LOCATION TEST BY REPORT TYPH
SOURCE DESCRIPTION DATE OF FIRST TEST RUN NO. OF RUNS
CHAMPION BUILDING PRODUCTSI GAYLORD, MI SIiANSON HC
N-6 FURNACE STACK 01/19/80 MASS=1 1 PM10=1
LONGVIEW FIBERI NOT SPECIFIED, WASH. DEPT. OF ECOLOGY CS
KRAFT RECOVERY PLANT 06/11/75 MASS=O 1 PM10=2
NOT SPECIFIEDI NOT SPECIFIED, . SORI CS HC
SULFATE PULPING, SALT CAKE FROM KRAFT RECOVERY BOILER 11/15/75 MASS=3 1 PM10=21
NOT SPECIFIEDI LOS ANGELES, CA KVB CS HC
HOG-WOOD WASTE FURNACE 10/13/77 MASS=O 1 P/'I10=1
NOT SPECIFIEDI LOS ANGELES, CA KVB HC
MILLWORK - HOUSING PRODUCTS, FINISHING 02/24/78 MASS=O 1 PM10=2
NOT SPECIFIEDI LOS ANGELES, CA KVB CS HC
SAWMILL OPERATIONS 03/31/78 MASS=O 1 PIHO=1
ST. REGIS PAPERI TACOMA, WA UtlKllOWN CS
SULFATE PULPING, KRAFT MILL RECOVERY FURNACE /'IASS=O 1 P1'I10=2
WEYERHAUSER CORP. 1 PLYMOUTH, tiC MONSANTO RESEARCH CS HC
SULFATE 05/01/75 MASS=O 1 PM10=11
WEYERHAUSER CORP. 1 PLYMOUTH, NC MONSANTO RESEARCH CS HC
SULFATE PULPING, LIME RECOVERY KILN 3 01/01/75 MASS=O 1 PM10=12
WEYERHAUSER CORP. 1 PLYMOUTH, HC MONSANTO RESEARCH CS HC
SULFATE PULPING, LIME RECOVERY KILN 3 I'IASS=O i PM10=20
WEYERHAUSER CORP. 1 PLYMOUTH, HC MONSANTO RESEARCH CS HC
SULFATE PULPING, LIME RECOVERY KILN 3 08/01/75 MASS=O 1 PM10=b
WICKS FOREST INDUSTRIESI CHONCHIllA, CA BtlR ASSOCIATES HC
COEN-HEIL DRYER 2-STACK 10/17/79 "ASS= 1 1 PIn 0= 1
NICKS FOREST INDUSTRIESI CHOWCHIlLA, CA BIiR ASSOCIATES HC
COEN-HEIL DRYER 12-STACK 01/21/80 MASS=1 1 PM10=4
NICKS FOREST INDUSTRIESI CHONCHILlA, CA BWR ASSOCIATES HC
COEN-HEIl DRYER 12-RECYClE DUCT 08/29/79 MASS=1 1 PM10=1
WICKS FOREST INDUSTRIESI CHONCHILlA, CA BWR ASSOCIATES HC
COEN-HEIL DRYER 12-STACK 08/29/79 MASS=3 1 PM10=3
* FOR REPORT TYPE: CS = computer sum.ary, HC = hard copy, PP = professional paper, and SR = summary report.
-------
09/30/88 LIST OF PARTICLE SIZE TEST REPORTS PAGE 3
WOOD PRODUCTS INDUSTRY
NAME/LOCA TI ON TEST BY REPORT TYPEJ
SOURCE DESCRIPTION DATE OF FIRST TEST RUN NO. OF RUNS
WOODEX INCORPORATED/ BROWNSVILLE, OR CH2M HILL HC
ROTARY MATERIAL DRYER 03/31/78 PlASS= 1 / PIH 0= 1
. FOR REPORT TYPE: CS = computer summary, HC = hard copy, PP = professional paper, and SR = summary report.
------- |