Landfill Gas-to-Energy Project
Opportunities

Landfill Profiles for the State of Virginia
 LANDFILL METHANE
 OUnCAGH PROGRAM

-------
        EPA Landfill Methane Outreach Program
                  The EPA Landfill Methane Outreach Program, a key
                  component of  the United State's  Climate Change
                  Action Plan, encourages the use of landfill gas (LFG)
                  as an energy  resource.   EPA assists utilities,
municipal and private landfill owners and operators, tribes, and state
agencies in  reducing methane emissions  from landfills through the
development of profitable landfill energy recovery projects. Methane
captured from landfills can be transformed into a cost-effective fuel source
for electricity, heat, boiler and vehicular fuel, or sale to a pipeline. EPA
estimates there are approximately 200 landfill methane recovery projects
in the U.S. and that up to 750 landfills could install economically viable
landfill energy projects.

The  Landfill  Methane Outreach  Program  includes  five  important
components:   the State Ally,  Energy Ally, Industry Ally, Community
Partner, and Endorser programs. EPA establishes separate alliances with
state agencies, energy providers (including investor-owned, municipal and
other public power utilities and cooperatives), key trade and public sector
associations, members of the landfill gas development industry (including
developers,  engineers,  equipment vendors, and  others) and  local
communities, municipalities and landfill  owner/operators through a
Memorandum of  Understanding (MOU).   By signing  the MOU, each
Ally/Partner acknowledges a shared commitment to the promotion  of
landfill gas-to-energy recovery at solid waste landfills, recognizes that the
widespread use of landfill gas will reduce emissions of methane and other
gases, and commits to undertake activities to enhance development of this
resource. In return, EPA agrees to provide landfill gas-to-energy project
assistanceand public recognition of the Allies' and Partners' participation
in the program.

-------
                   Introduction

                   Since  1994  the  U.S.  EPA's  Landfill  Methane
                   Outreach Program (LMOP) has participated  in an
                   ongoing effort to gather information on Municipal
                   Solid Waste landfills (MSW).  A key component of
                   the LMOP is to provide MSW landfill owners and
                   operators,  project developers, utilities, and  other
                   potential project  participants  with information on
                   MSW  landfills  that  may offer attractive energy
                   development opportunities. This document presents
                   state specific landfill information, hereinafter referred
                   to as the landfill profiles. These profiles are useful to
                   evaluate the potential for developing landfill gas-to-
                   energy projects  (LFGTE).   EPA assembled this
                   information from state and local sources as well as
                   various national solid waste  publications,  landfill
                   owners and operators, and project developers.

                   The  EPA  has  prepared  a  separate document to
                   describe the methodology used to develop the  state-
                   specific landfill profiles and estimate the benefits of
                   using LFGTE as an energy source.  The document,
                   Landfill  Gas-to-Energy  Project  Opportunities,
                   Background  Information   on  Landfill  Profiles,
                   contains background information on gas collection
                   and use, describes the data fields according to the five
                   sections listed on the  landfill profiles, and where
                   applicable, illustrates calculations and default values
                   used to derive estimates. EPA strongly recommends
                   that  users  read  the  document prior to using  the
                   landfill profiles.  Users can obtain the document by
                   calling the LMOP hotline at 1-888-STAR-YES.
                                     Data Sources
                       EPA-ORD  Landfill Gas  Utilization-Survey (Thomeloe,
                       1997)
                       Directory and Atlas of Solid Waste Disposal Facilities
                       (SWA, 1994)
                       Implementation Guide for Landfill Gas Recovery Projects
                       in the Northeast (SCS, 1994)
                       Landfill Gas-to-Energy 1994-1995 Activity Report (SWT,
                       1994)
                       Methane Recovery from Landfill Yearbook (GAA, 1994)
                       Project developers, landfill owners, and operators
                       State and local records
                       Survey of Landfill Gas Generation Potential (EPRI, 1992)
                       U.S. Landfill Directory (SWANA,  1992)
Landfill Classification

To facilitate the use of available landfill information,
EPA has categorized the landfills into five categories:
Current Project,1 Candidate Project, Shutdown, Other,
and Unknown waste-in-place (WIP). These categories
are based  on the status  of  the landfill's LFGTE
project(s) and WIP. The generation of methane is a
function  of many factors, the most critical being the
amount of waste-in-place and the number of years the
waste  has  been  in the  landfill.   Peak  methane
generation  occurs soon  after  closure; therefore, the
longer the landfill has been closed, the less attractive it
becomes for methane recovery. Based on the general
timing of peak methane generation, EPA assumes that
landfills that ceased accepting waste prior to 1993 have
a low probability of generating  enough methane to
make a gas recovery project economical. Consequently,
landfills need to be operating in 1993 to be considered
as having a Candidate Project.
               Landfill Categorizes
  Current Project:
  •  Landfill with operational LFGTE project or landfill with
    LFGTE project under construction.
  Candidate Project:
  •  Landfill with a potential or planned LFGTE  utilization
    project; or
  •  Landfill is currently operating or closed after 1993; and has
    more than 1,000,000 tons of municipal solid waste-in-
    place.2
  Shutdown:
  •  Landfill with shutdown LFGTE project.
  Other:
  •  Landfill has less than  1,000,000 tons of municipal solid
    waste-in-place with no current or planned LFGTE project.
  Unknown WIP:
  •  Landfill with insufficient data to  determine the waste-in-
    place.
State Summary
State-specific  landfill  profile  information   is
summarized in three exhibits. Exhibit 1 presents a
summary  of  the  state-specific potential for LFG
utilization energy  by landfill category.  Exhibit 2
summarizes the emissions avoided  by fossil fuel
displacement for electricity generation and direct use
projects.  Exhibit 3 presents an index of the state-
specific MSW  landfills, referenced by category,
landfill name and general characteristics.
                   1  Current projects illustrate the wide range of successful project development options.

                   2  By modeling the relationship between WIP and methane generation, a cut-off of 1,000,000 tons of WIP was
                   established; landfills having at least 1,000,000 tons of WIP are considered candidate landfills.
LANDHLL METHANE
OUTREACH PROGRAM

-------
Exhibit 1: Virginia MSW Landfill Summary
Category
Current
Candidate
Shutdown
Other
Unknown WIP
Total
No. of
Landfills
9
17
2
6
6
40
Est. Capacity Potential
Electricity
(MW)
69
57
3
2

131
Gas Capacity
(mmBtu/hr)
688
570
26
24

1,308
Est. CH4
Generation
(mmscf/d)
22
18
1
1

42
Methane Reduction
(tons/yr)
Potential
127,272
105,463
4,789
4,388

241,911
Current
44,865
5,782
5,011
0

55,658
CO2 Equivalent of CH4
Reduction
(tons/yr)
Potential
2,672,702
2,214,729
100,559
92,148

5,080,137
Current
942,167
121,414
105,227
0

1,168,808
Exhibit 2: Potential Virginia Emissions Avoided by Fossil Fuel Displacement
Category
Current
Candidate
Shutdown
Other
Unknown WIP
Total
Electricity Generation Project
CO2 (tons/yr)
Coal
543,81 1
449,098
20,521
18,153

1,031,584
Oil
446,336
368,599
16,843
14,899

846,677
Natural
Gas
300,122
247,851
11,325
10,019

569,318
SO2 (tons/yr)
Coal
3,437
2,839
130
115

6,520
Oil
2,873
2,372
108
96

5,450
Natural
Gas
0
0
0
0

0
Direct Use Project
CO2 (tons/yr)
Coal
383,261
317,588
14,420
13,214

728,483
Oil
314,563
260,662
11,835
10,846

597,906
Natural
Gas
211,516
175,273
7,958
7,293

402,040
SO2 (tons/yr)
Coal
3,487
2,890
131
120

6,629
Oil
1,833
1,519
69
63

3,484
Natural
Gas
2
2
0
0

4
                                                VA-2
                                                                                December 05,1998

-------
Exhibit 3: Index of Landfills in Virginia
Category
Current
Current
Current
Current
Current
Current
Current
Current
Current
Candidate
Candidate
Candidate
Candidate
Candidate
Candidate
Candidate
Candidate
Candidate
Candidate
Candidate
Candidate
Candidate
Candidate
Candidate
Candidate
Candidate
Shutdown
Shutdown
Other
Other
Other
Other
Other
Other
Unknown WIP
Unknown WIP
Unknown WIP
Unknown WIP
Unknown WIP
Landfill Name
1-95LortonLF
1-95LortonLF
1-95LortonLF
Big Bethel LF
Big Bethel LF
Independent Hill LF Prince William
Old Dominion Landfill
SPSA Regional LF
SPSA Regional LF
Albemarte Ivy SF
Atlantic Waste Disposal SLF
Charles City County SLF
Danville City SLF
Frederick County Winchester SLF
Greene County
Loudoun County LF
Lynchburg City LF
Maplewood Recycling and Waste Dispo
Martinsville City LF
Newport News LF
Newport News Solid Waste Disposal F
Nuckols Road LF
Petersburg City LF
Shoosmith Richmond Area LF
Smith Gap Regional Landfill
Virginia Beach LF #2 Mount Trashmore
Carver Heights Landfill Gas Project
Dinwiddie County Landfill Gas Project
Bedford City Hylton Site
Bedford County SLF
Chesterfield County Northern Area LF
Franklin County SLF
Orange County LF
Stafford County LF
Amelia County SLF
Frederick County SLF
Lynchburg City SLF
Madison District LF
Rutrough Road Landfill
WIP
<2.5 million
tons
U
u
U
u
u
u
u
u
u
u
u
u
u
u
u
Id
Id
u
Id
Id
Id
U
Id
U
u
u
Id
Id
id
Id
Id
Id
Id
Id
U
U
u
u
u
2.5 to 4
million tons
U
U
u
u
u
u
u
u
u
Id
U
u
Id
Id
U
U
U
U
U
U
U
Id
U
Id
U
U
U
u
u
u
u
u
u
u
u
u
u
u
u
>4 million tons
Id
Id
Id
U
U
U
U
Id
Id
U
U
Id
U
u
u
u
u
Id
U
U
u
u
u
u
M
d
U
u
u
u
u
u
u
u
u
u
u
u
u
Landfill
Operating in
1998
U
U
u
Id
Id
Id
U
Id
Id
Id
U
Id '
Id
Id
U
Id
U
Id
Id
U
U
U
Id
Id
U
Id
U
U
id
ki
Id
Id
Id
hd
Id
Id
Id
Id
U
LFG Collected
U
U
Id
U
U
U
Id
U
Id
U
U
U
u
u
u
u
u
u
u
u
u
Id
U
U
U
Id
Id
Id
U
U
U
u
u
u
u
u
u
u
u
LFG
Utilization
Project
Id
Id
Id
U
Id
U
Id
Id
Id
U
u
u
u
u
u
u
u
u
u
u
u
u
u
u
u
u
u
u
u
u
u
u
u
u
u
u
u
u
u
Status of LFGTE
Project
Operational
Operational
Operational
Construction
Operational
Construction
Operational
Operational
Operational
Potential
Potential
Planned
Potential
Potential
Planned
Unknown
Planned
Planned
Potential
Unknown
Planned
Planned
Unknown
Planned
Potential
Planned
Shutdown
Shutdown
Unknown
Unknown
Unknown
Unknown
Unknown
Unknown
Unknown
Unknown
Unknown
Unknown
Unknown
               VA-3
December 05,1998

-------
Exhibit 3: Index of Landfills in Virginia
Category
Unknown WIP
Landfill Name
Woods Road SLF
WIP
<2.5 million
tons
U
2.5 to 4
million tons
U
>4 million tons
U
Landfill
Operating in
1998
Is/I
LFG Collected
U
LFG
Utilization
Project
U
Status of LFGTE
Project
Unknown
               VA-4
December 05,1998

-------
                                                        l-95LortonLF
                                                                              Landfill Category:    Current
                                         A. GENERAL LANDFILL INFORMATION :
Landfill Owner:
Landfill Owner Type:
Alternative Landfill Name:
City:
County:
State:
Year Open:
Year Closed:
      Public
      I 95 Resource Recovery LF
      Fairfax
      Fairfax
      VA
      1973
      1995
Annual Acceptance Rate (tons):
Year Annual Acceptance Rate Reported:
Design Capacity (tons):
Acres Currently Landfilled (acres):
Average Depth (feet):
Waste-in-Place (tons):
1998 Waste-in-Place (tons):
                                                                                                                     286,000


                                                                                                                        300
                                                                                                                        100

                                                                                                                  29,034,133
                                             BmANDFILL GAS COLLECTION
Estimated Methane Generation (mmscf/d):
LFG Collection System Status:
Current LFG Collected (mmscf/d):
Collection and Treatment System Required Under NSPS/EG:
                                                  7.84
                                            Operational
                                                   3.3
                                                   No
                                             C. LANDFILL GAS UTILIZATION
Current Utilization:
    Utilization System Status:
    Utilization System Type:
    Utilization System Start Year:
    Electric Utility Provider(s):
    Natural Gas Provider(s):
    Energy Purchaser(s):
                Operational
                Reciprocating Engine
                1991
                Virginia Electric & Power Co
Capacity: Electricity Generation Project (MW) OR Direct Use Project (mmBtu/hr)
Estimated Potential Capacity:
Current Capacity:
Planned Capacity:
25
3.2
245
69
Utilities in County: Northern Virginia Elec Coop; Southeastern Power Admin; Virginia Electric & Power Co
                                     D. ENVIROMENTAL BENEFITS OF UTILIZATION
•; -._ ^ ,,_- _ -•_ , *" *-"' T»««w«M.»»,*r»«j,«».«un**» ^*w w* v*.»*>»t
-------
                                                           l-95LortonLF
                                                                               Landfill Category:    Current i
                                            A. GENERAL LANDFILL INFORMATION
 Landfill Owner:
 Landfill Owner Type:
 Alternative Landfill Name:
 City:
 County:
 State:
 Year Open:
 Year Closed:
      Public
      I 95 Resource Recovery LF
      Fairfax
      Fairfax
      VA
      1973
      1995
Annual Acceptance Rate (tons):
Year Annual Acceptance Rate Reported:
Design Capacity (tons):
Acres Currently Landfilled (acres):
Average Depth (feet):
 1998 Waste-in-Place (tons):
1998 Waste-in-Place (tons):
                           286,000
                              1998

                               300
                               100
                         18,072,000
                         18,072,000
                                               B. LANDFILL GAS COLLECTION
 Estimated Methane Generation (mmscf/d):
 LFG Collection System Status:
 Current LFG Collected (mmscf/d):
 Collection and Treatment System Required Under NSPS/EG:
                                                   5.04

                                                   1.44
                                                     No
                                      ;       ?   C; LANDFILL GAS UTILIZATION:
 Current Utilization:
     Utilization System Status:
     Utilization System Type:
     Utilization System Start Year:
     Electric Utility Provider(s):
     Natural Gas Provider(s):
     Energy Purchaser(s):

 Capacity:
                Operational
                Direct Thermal
                1997
                Virginia Electric & Power Co

                   Electricity Generation Project (MW)
           OR
Direct Use Project (mmBtu/hr)
Estimated Potential Capacity:
Current Capacity:
Planned Capacity:
16
158
30
Utilities in County: Northern Virginia Elec Coop; Southeastern Power Admin; Virginia Electric & Power Co
i Methane Reduction (tons/yr):
 CO2 Equivalent ofCH4 Reduction (tons/yr):
                                                                  Potential
                                                            29,141
                                                           611,969
                                                                                      Current
                                                     5,550
                                                   116,556
 Emissions Avoided by Fossil Fuel Displacement:

                                       Coal:
                                    Fuel Oil:
                                 Natural Gas:
                                  Electricity Generation Project
                                 CO2 (tons/yr)       SO2 (tons/yr)
                                       124,706               788
                                       102,353               659
                                        68,823                 0
                                 Direct Use Project
                            CO2 (tons/yr)       SO2 (tons/yr)
                                  87,755               799
                                  72,026               420
                                  48,431                 0
                                                  E. CONTACT INFORMATION
                                        Landfill Owner
                                                                        Landfill Operator
 Contact Name:

 Mailing Address:

 Phone Number:

 Fax Number:
Earl Delauder
9850 Furnace Road

703-690-1703
        12000 Government Center Pkwy
        Suite 324
        703-690-1525
 * Itallicized indicates values estimated by EPA.
 Jfcr*«  STAR Version 1.0 / LMOP
                                             December 5, 1998
                             State:  VA
                     Page:

-------


1 -95 Lorton LF Landfill Category:
Current
- :•';•./:• '^ •-,/'•• •••'•":"" \"/ ' ; A. GENERAL LANDFILL INFORMATION ./'. • >. ; ;'• .:';/:,, :•;"/.
Landfill Owner:
Landfill Owner Type:
Alternative Landfill Name:
City:
County:
State:
Year Open:
Year Closed:


Public
I 95 Resource Recovery
Fairfax
Fairfax
VA
1973
1995
B
Annual Acceptance Rate (tons):
Year Annual Acceptance Rate Reported:
LF Design Capacity (tons):
Acres Currently Landfilled (acres):
Average Depth (feet):
1998 Waste-in-Place (tons):
1998 Waste-in-Place (tons):

. LANDFILL GAS COLLECTION
286,000
1998

300
100
18,072,000
18,072,000


Estimated Methane Generation (mmscf/d):
LFG Collection System Status:
Current LFG Collected (mmscf/d):
Collection and Treatment System Required Under NSPS/EG:
                                                     5.04

                                                      3.3
                                                      No
                                              C. LANDFILL GAS UTILIZATION
Current Utilization:
    Utilization System Status:
    Utilization System Type:
    Utilization System Start Year:
    Electric Utility Provider(s):
    Natural Gas Provider(s):
    Energy Purchaser(s):

Capacity:
                 Operational
                 Reciprocating Engine
                 1993
                 Virginia Electric & Power Co

                    Electricity Generation Project (MW)
    OR
                                                                                            Direct Use Project (mmBtu/hr)
    Estimated Potential Capacity:
    Current Capacity:
    Planned Capacity:
                                                      16
                                                     3.2
                                              158
                                               69
Utilities in County:
                 Northern Virginia Elec Coop; Southeastern Power Admin; Virginia Electric & Power Co
                                      D. ENVIROMENTAL BENEFITS OF UTILIZATION
                                                                 Potential
Methane Reduction (tons/yr):
CO2 Equivalent ofCH4 Reduction (tons/yr):
                                                              29,141
                                                            611,969
                                                                                        Current
                                              12,720  !
                                            267,110
Emissions Avoided by Fossil Fuel Displacement:

                                      Coal:
                                   Fuel Oil:
                               Natural Gas:
                                   Electricity Generation Project
                                  CO2 (tons/yr)        SO2 (tons/yr)
                                        124,706               788
                                        102,353               659
                                         68,823                 0
                          Direct Use Project
                    CO2 (tons/yr)        SO2 (tons/yr)
                           87,755               799
                           72,026               420
                           48,431                 0
                                                E. CONTACT INFORMATION
                                       Landfill Owner
                                                                          Landfill Operator
Contact Name:
Mailing Address:

Phone Number:
Fax Number:
I Earl Delauder
i
j 9850 Furnace Road
!
: 703-690-1703
12000 Government Center Pkwy
Suite 324
703-690-1525
* Itallicized indicates values estimated by EPA.
         STAR Version 1.0/LMOP
                                                                 Decembers, 1998
                                                                              State:  VA
                                      Page:

-------
                                                         Albemarle Ivy SF
                                                                         Landfill Category:  Candidate
                                           A. GENERAL LANDFILL INFORMATION
Landfill Owner:
Landfill Owner Type:
Alternative Landfill Name:
City:
County:
State:
Year Open:
Year Closed:
Public
Rivanna Solid Waste Authority LF
Charlottes ville
Albemarle
VA
1973
2013
Annual Acceptance Rate (tons):
Year Annual Acceptance Rate Reported:
Design Capacity (tons):
Acres Currently Landfilled (acres):
Average Depth (feet):
Waste-in-Place (tons):
1998 Waste-in-Place (tons):
                                                                                            104,962
                          2,519,088
                          2,519,088
                                               B. LANDFILL GAS COLLECTION
Estimated Methane Generation (mmscf/d):
LFG Collection System Status:
Current LFG Collected (mmscf/d):
Collection and Treatment System Required Under NSPS/EG:
                                              1.06
                                               No
                                                C. LANDFILL GAS UTILIZATION
Current Utilization:
     Utilization System Status:
     Utilization System Type:
     Utilization System Start Year:
     Electric Utility Provider(s):
     Natural Gas Provider(s):
     Energy Purchaser(s):

Capacity:
          Potential
          Unknown
             Electricity Generation Project (MW)
           OR
Direct Use Project (mmBtu/hr)
Estimated Potential Capacity: 3 33
Current Capacity:
Planned Capacity:
Utilities in County: Central Virginia Electric Coop; Rappahannock Electric Coop; Southeastern Power Admin; Virginia E
. - "'--;- ' -<' ' * ; f> «>• ENVIROMENTAL BENEFITS OF UTILIZATION . j '*>'-, ',/.;,>--".
Methane Reduction (tons/yr):
: CO2 Equivalent ofCH4 Reduction (tons/yr):
Emissions Avoided by Fossil Fuel Displacement:
Coal:
Fuel Oil:
Natural Gas:
Potential
6,142
128,978
Electricity Generation Project
C02 (tons/yr) SO2 (tons/yr)
26,046 165
21,378 138
14,375 - 0
Current
0
0
Direct Use Project
CO2 (tons/yr) SO2 (tons/yr)
18,495 168
15,180 89
10,207 0
E. CONTACT INFORMATION
Landfill Owner Landfill Operator
Contact Name:
Mailing Address:
Phone Number:
Fax Number:
Steve Chitzy i Leonard Walker
401 Mclntyre Road j PO Box 979
804-977-2970 ext. 129 j 804-977-2976
1
* Itallicized indicates values estimated by EPA.
          STAR Version 1.0 / LMOP
                                       Decembers, 1998
                             State:  VA
                     Page:
  '?

-------
Atlantic Waste
!:;!;;;, ,h;' fe <:',KI; &,- :?,:^?;:K <"•*: K^I&^ENERA^i^i^jf
Landfill Owner: Atlantic Waste Disposal
Landfill Owner Type: Private
Alternative Landfill Name:
City: ' Sussex
County: Sussex
State: VA
Year Open: 1991
Year Closed: 1996
Disposal SLF Landfill Category: Candidate
LLD^RMA-npl* f %;|:V ; j :^.;~ ^ . |^ .;?;. |fr i f :i\r^,l;,'.
Annual Acceptance Rate (tons):
Year Annual Acceptance Rate Reported:
Design Capacity (tons): 1 ,559,688
Acres Currently Landfilled (acres): 206
Average Depth (feet):
Waste-in-Place (tons):
1998 Waste-in-Place (tons):
(• "' & /I; ; ;' f~t •,!/> _ ;"; : A '^ €^ •* :,, £,,5 : 'j i; 'B.s LANDFILL GAS'^OUM&lQN'fi ', ;,:~ ti '?:, '•' ' '* ~:.\ A '' ; ,:; ":': < iS:'Sf -> "\ ';"C '- '-"'
Estimated Methane Generation (mmscf/d):
LFG Collection System Status:
Current LFG Collected (mmscf/d):
Collection and Treatment System Required Under NSPS/EG:
l~ .!;;,- ;| "f 'y.:~,,, lt!; *lb. lil,^' i; ''•*"' t,, : 5,,' ' ,'=,"•! :;C- LANDFI|.L:GA5
No
>;upLiZA!raQK;:f>;; * "/.Sl^V"^-^-'-^ *vHi'1; ••'•!' ^'-'-
Current Utilization:
Utilization System Status: Potential
Utilization System Type: Unknown
    Utilization System Start Year:
    Electric Utility Provider(s):
    Natural Gas Provider(s):
    Energy Purchaser(s):
Capacity:
                                         Electricity Generation Project (MW)
OR
Direct Use Project (mmBtu/hr)
    Estimated Potential Capacity:
    Current Capacity:
    Planned Capacity:
Utilities in County:
                                     Community Electric Cooperative; Mecklenburg Electric Coop; Prince George Electric Coop; Southeas
Methane Reduction (tons/yr):
CO2 Equivalent ofCH4 Reduction (tons/yr):
                                                                   Potential
                                                                                                               Current
Emissions Avoided by Fossil Fuel Displacement:

                                       Coal:
                                    Fuel Oil:
                                Natural Gas:
                                                        Electricity Generation Project
                                                       CO2 (tons/yr)        SO2 (tons/yr)
                       Direct Use Project
                 CO2 (tons/yr)        SO2 (tons/yr)
                                        Landfill Owner
                                                                                                Landfill Operator
Contact Name:       , Carlton Duddings
Mailing Address:     ' 4451 Crossings Boulevard

Phone Number:      , 804-748-8690
Fax Number:
                                                                           I  3474 Atlantic Lane
                                                                             804-834-8300
* Itallicized indicates values estimated by EPA.
<§**«   STAR Version 1.0 / LMOP
  I
                                                                   Decembers, 1998
                   State:   VA     Page:

-------
                                                           Big Bethel LF
                                                                          Landfill Category:    Current
                                            A. GENERAL LANDFILL INFORMATION
Landfill Owner:
Landfill Owner Type:
Alternative Landfill Name:
City:
County:
State:
Year Open:
Year Closed:
WMI                                    Annual Acceptance Rate (tons):
Private                                   Year Annual Acceptance Rate Reported:
Big Bethel LF Big Bethel LF SLF Incorporat  Design Capacity (tons):
Newport News                            Acres Currently Landfilled (acres):
Hampton                                 Average Depth (feet):
VA                                      Waste-in-Place (tons):
1988                                     1998 Waste-in-Place (tons):
2000
                                            316
                                               B. LANDFILL GAS COLLECTION
Estimated Methane Generation (mmscf/d):
LFG Collection System Status:
Current LFG Collected (mmscf/d):
Collection and Treatment System Required Under NSPS/EG:
                                               No
                                                C. LANDFILL GAS UTILIZATION
Current Utilization:
    Utilization System Status:
    Utilization System Type:
    Utilization System Start Year:
    Electric Utility Provider(s):
    Natural Gas Provider(s):
    Energy Purchaser(s):

Capacity:
          Operational
          Leachate Evaporation
          1997
             Electricity Generation Project (MW)
OR
                                                                                            Direct Use Project (mmBtu/hr)
    Estimated Potential Capacity:
    Current Capacity:
    Planned Capacity:
Utilities in County:
          Southeastern Power Admin; Virginia Electric & Power Co
                                                                                          • '
Methane Reduction (tons/yr):
CO2 Equivalent ofCH4 Reduction (tons/yr):
                                                                   Potential
                                                                                Current
Emissions Avoided by Fossil Fuel Displacement:

                                       Coal:
                                    Fuel Oil:
                                Natural Gas:
                            Electricity Generation Project
                           CO2 (tons/yr)       SO2 (tons/yr)
                      Direct Use Project
                CO2 (tons/yr)       SO2 (tons/yr)
E. CONTACT INFORMATION
Landfill Owner • Landfill Operator
Contact Name:
Mailing Address:
Phone Number:
M Freeman
2972 Armistead Avenue
804-766-1092
6201 Powers Ferry Road
Suite 150
804-723-5273
Fax Number:
* Itallicized indicates values estimated by EPA.
          STAR Version 1.0 / LMOP
                                                                  Decembers, 1998
                                                                       State:  VA
                                 Page:

-------
Big Bethel LF Landfill Category: Current
r • ' -,;--'-; A. GENERAL LANDFILL INFORM ATION ; C " \', ' ;:,y-
Landfill Owner:
Landfill Owner Type:
Alternative Landfill Name:
City:
County:
State:
Year Open:
Year Closed:
Sanifill
Private

Newport News
Hampton
VA
1988
2000
Annual Acceptance Rate (tons):
Year Annual Acceptance Rate Reported: 1998
Design Capacity (tons):
Acres Currently Landfilled (acres): 3 1 6
Average Depth (feet):
1998 Waste-in-Place (tons):
1998 Waste-in-Place (tons):

; ",^ B. LANDFILL GAS COLLECTION " /
Estimated Methane Generation (mmscf/d):
LFG Collection System Status:
Current LFG Collected (mmscf/d):
Collection and Treatment System Required Under NSPS/EG:
                                                     No
                                                : LANDFILL GAS UTILIZATION
Current Utilization:
    Utilization System Status:
    Utilization System Type:
    Utilization System Start Year:
    Electric Utility Provider(s):
    Natural Gas Provider(s):
    Energy Purchaser(s):
                Construction
                Reciprocating Engine
                1998
Capacity: Electricity Generation Project (MW) OR Direct Use Project (mmBtu/hr)
Estimated Potential Capacity:
Current Capacity:
Planned Capacity: 0.095
Utilities in County: Southeastern Power Admin; Virginia Electric & Power Co
i _..,••:"/'.'" „ D. ENVIROMENTAL BENEFITS OF UTILIZATION ;. :•'""•',':• '''-;':;'"f
Methane Reduction (tons/yr):
CO2 Equivalent ofCH4 Reduction (tons/yr):
Emissions Avoided by Fossil Fuel Displacement:
Coal:
Fuel Oil:
Natural Gas:
Potential
Electricity Generation Project
CO2 (tons/yr) SO2 (tons/yr)
Current
Direct Use Project
CO2 (tons/yr) SO2 (tons/yr) '
j E. CONTACT INFORMATION ^ i
Landfill Owner Landfill Operator
Contact Name: M Freeman
Mailing Address: 2972 Armistead Avenue 6201 Powers Ferry Road
Phone Number:
Fax Number:
804-766-1092
Suite 150
804-723-5273
* Itallicized indicates values estimated by EPA.
  i:
         STAR Version 1.0 / LMOP
                                                                 Decembers, 1998
                                                                             State:  VA
                                      Page:
 f

-------
                                                 Carver Heights Landfill Gas Project
                                                                          Landfill Category:  Shutdown
                                           A. GENERAL LANDFILL INFORMATION
Landfill Owner:
Landfill Owner Type:
Alternative Landfill Name:
City:
County:
State:
Year Open:
Year Closed:
Chesterfield County
Public
Carver Heights LF
Chester
Chesterfield
VA
1962
1990
Annual Acceptance Rate (tons):
Year Annual Acceptance Rate Reported:
Design Capacity (tons):
Acres Currently Landfilled (acres):
Average Depth (feet):
 1994 Waste-in-Place (tons):
1998 Waste-in-Place (tons):
                                 86
                                 28
                          1,250,000
                          1,250,000
                                               B. LANDFILL GAS COLLECTION
Estimated Methane Generation (mmscf/d):
LFG Collection System Status:
Current LFG Collected (mmscf/d):
Collection and Treatment System Required Under NSPS/EG:
                                             0.67
                                       Operational
                                              0.9
                                              No
                                               C. LANDFILL GAS UTILIZATION
Current Utilization:
     Utilization System Status:
     Utilization System Type:
     Utilization System Start Year:
     Electric Utility Provider(s):
     Natural Gas Provider(s):
     Energy Purchaser(s):

Capacity:
          Shutdown
          Reciprocating Engine
          1994
          Virginia Electric & Power Co

             Electricity Generation Project (MW)
            OR
Direct Use Project (mmBtu/hr)
Estimated Potential Capacity:
Current Capacity:
Planned Capacity:
Utilities in County:
1
2
.6
21
19
Southeastern Power Admin; Southside Electric Coop Inc; Virginia Electric & Power Co
',/•* '„ "' ''* :$]*.' , - '*- D. ENVIROMENTAL BENEFITS OF UTILIZATION f- ; , -_ ~: ''.^ -'•>'", «,_..
Methane Reduction (tons/yr):
CO2 Equivalent ofCH4 Reduction (tons/yr):
Emissions Avoided by Fossil Fuel Displacement:
Coal:
Fuel Oil:
Natural Gas:
Potential
3,869
81,249
Electricity Generation Project
C02 (tons/yr) SO2 (tons/yr)
16,575 105
13,604 88
9,147 0
Current
3,469
72,849
Direct Use Project
CO2 (tons/yr) SO2 (tons/yr)
11,651 106
9,563 56
6,430 0
E. CONTACT INFORMATION

Contact Name:
Mailing Address:
Phone Number:
Fax Number:
Landfill Owner


Landfill Operator

* Italicized indicates values estimated b\ EPA.
                                       Decembers, 1998
                              State:  VA
                     Page:
          STAR Version 1.0 / LMOP

-------
                                                     Charles City County SLF
                                                                          Landfill Category:   Candidate
                                          A. GENERAL LANDFILL INFORMATION
Landfill Owner:
Landfill Owner Type:
Alternative Landfill Name:
City:
County:
State:
Year Open:
Year Closed:
Private
Chambers Charles City LF; Chambers LF; C
Charles City
Charles City
VA
1989
2011
Annual Acceptance Rate (tons):
Year Annual Acceptance Rate Reported:
Design Capacity (tons):
Acres Currently Landfilled (acres):
Average Depth (feet):
Waste-in-Place (tons):
7998 Waste-in-Place (tons):
                                                                                            800,800
                                                                                                                           294

                                                                                                                     6,406,400
                                                                                                                     6,406,400
                                              B. LANDFILL GAS COLLECTION
Estimated Methane Generation (mmscf/d):
LFG Collection System Status:
Current LFG Collected (mmscf/d):
Collection and Treatment System Required Under NSPS/EG:
                                             2.06
                                              No
                                              C. LANDFILL GAS UTILIZATION
Current Utilization:
    Utilization System Status:
    Utilization System Type:
    Utilization System Start Year:
    Electric Utility Provider(s):
    Natural Gas Provider(s):
    Energy Purchaser(s):

Capacity:
         Planned
         Unknown
         2000
             Electricity Generation Project (MW)
            OR
                                                                                           Direct Use Project (mmBtu/hr)
Estimated Potential Capacity: 6 64
Current Capacity:
Planned Capacity:
Utilities in County: Southeastern Power Admin; Virginia Electric & Power Co
; D.ENVIROMENTAL BENEFITS OF UTILIZATION
Methane Reduction (tons/yr):
CO2 Equivalent ofCH4 Reduction (tons/yr):
Emissions Avoided by Fossil Fuel Displacement:
Coal:
Fuel Oil:
Natural Gas:
Potential
11,890
249,698
Electricity Generation Project
CO2 (tons/yr) SO2 (tons/yr)
50,514 319
41,459 267
27,878 0
Current
0
0
Direct Use Project
CO2 (tons/yr) SO2 (tons/yr)
35,806 326
29,388 171
19,761 0
j' " W •' -,- E- CONTACT INFORMATION x ;• :
Landfill Owner Landfill Operator j
Contact Name: Lee Wilson \ William Cooksey !
1 : !
Mailing Address: 8000 Chambers Road , 8000 Chambers Road
Phone Number: 804-966-7146 804-966-7146
Fax. Number:
* Itallicized indicates values estimated by EPA.
         STAR Version 1.0 / LMOP
                                                                 Decembers, 1998
                                                                      State:  VA
                                             Page:
 '•*•	•»»•

-------
Danville City SLF Landfill Category: Candidate
A. GENERAL LANDFILL INFORMATION
Landfill Owner:
Landfill Owner Type:
Alternative Landfill Name:
City:
County:
State:
Year Open:
Year Closed:

Public

Danville
Danville
VA
1973

Annual Acceptance Rate (tons): 1 14,400
Year Annual Acceptance Rate Reported:
Design Capacity (tons):
Acres Currently Landfilled (acres):
Average Depth (feet):
Waste-in-Place (tons): 2,745,600
1998 Waste-in-Place (tons): 2,745,600

B. LANDFILL GAS COLLECTION
Estimated Methane Generation (mmscf/d):
LFG Collection System Status:
Current LFG Collected (mmscf/d):
Collection and Treatment System Required Under NSPS/EG:
                                     1.12
                                      No
                                                C. LANDFILL GAS UTILIZATION
Current Utilization:
    Utilization System Status:
    Utilization System Type:
    Utilization System Start Year:
    Electric Utility Provider(s):
    Natural Gas Provider(s):
    Energy Purchaser(s):

Capacity:
Potential
Unknown
   Electricity Generation Project (MW)
OR
Direct Use Project (mmBtu/hr)
Estimated Potential Capacity:
Current Capacity:
Planned Capacity:
Utilities in County:
\~,£" ^ - ~, ~ - «* - 4 '-I- ?.^'-;V '*f * '^K*^*-'",'
4 35
Southeastern Power Admin
, ;/ D;*miROME^AL3ENEFT^ » v , ._ , , ;- , ,, -' ,^-/f - >,;;} ,^ %
Methane Reduction (tons/yr):
CO2 Equivalent ofCH4 Reduction (tons/yr):
Emissions Avoided by Fossil Fuel Displacement:
Coal:
Fuel Oil:
Natural Gas:
Potential
6,477
136,013
Electricity Generation Project
CO2 (tons/yr) SO2 (tons/yr)
27,625 175
22,673 146
15,246 0
Current
0
0
Direct Use Project
CO2 (tons/yr) SO2 (tons/yr)
19,504 178
16,008 93
10,764 0
E. CONTACT INFORMATION
Landfill Owner Landfill Operator
Contact Name: j Tom Spicer, City Manager j
I \
Mailing Address: j PO Box 3300 i PO Box 3300
I i
i i
Phone Number: | 804-799-5245 ; 804-799-5100
Fax Number: \ ':
* Itallicized indicates values estimated by EPA.
jU»«   STAR Version 1.0 / LMOP
  ,j
                                                                   Decembers, 1998
                                                             State:  VA
                                 Page:
                                 10

-------
                                               Dinwiddie County Landfill Gas Project
                                                                        Landfill Category:   Shutdown
                                          "A. GENERAL LANDFILL:INFORMATION
 Landfill Owner:
 Landfill Owner Type:
 Alternative Landfill Name:
 City:
 County:
 State:
 Year Open:
 Year Closed:
Dinwiddie County
Public
Dinwiddie County LF
Dinwiddie
Dinwiddie
VA
1979
1994
Annual Acceptance Rate (tons):
Year Annual Acceptance Rate Reported:
Design Capacity (tons):
Acres Currently Landfilled (acres):
Average Depth (feet):
 1994 Waste-in-Place (tons):
7995 Waste-in-Place (tons):
            10
            30
       450,000
       450,000
L
                  , B. LANDFILL GAS COLLECTION-
 Estimated Methane Generation (mmscf/d):
 LFG Collection System Status:
 Current LFG Collected (mmscf/d):
 Collection and Treatment System Required Under NSPS/EG:
                                            0.16
                                      Operational
                                             0.4
                                             No
I
                   C. LANDFILL GAS UTILIZATION
 Current Utilization:
     Utilization System Status:
     Utilization System Type:
     Utilization System Start Year:
     Electric Utility Provider(s):
     Natural Gas Provider(s):
     Energy Purchaser(s):
         Shutdown
         Reciprocating Engine
         1994
         Virginia Electric & Power Co
Capacity: Electricity Generation Project (MW) OR Direct Use Project (mmBtu/hr)
Estimated Potential Capacity:
Current Capacity:
Planned Capacity:
1
0.8
8
Utilities in County: Prince George Electric Coop; Southeastern Power Admin; Southside Electric Coop Inc; Virginia Elec
                                      D. ENVIROMENTAL BENEFITS OF UTILIZATION
Methane Reduction (tons/yr):
C02 Equivalent ofCH4 Reduction (tons/yr):
Emissions Avoided by Fossil Fuel Displacement:
Coal:
Fuel Oil:
Potential
920
19,310
Electricity Generation Project
CO2 (tons/yr) SO2 (tons/yr)
3,946
3,239
Natural Gas: 2,178
25
21
0
Current
1,542
32,378
Direct Use Project
CO2 (tons/yr) SO2 (tons/yr)
2,769
2,273
1,528
25
•
13
0
; !».

Contact Name:
Mailing Address:
Phone Number:
Fax Number:
!;' E. CONTACT INFORMATION '> j
Landfill Owner Landfill Operator j
i !
] j
, 804-469-4545 1
1
 * Itallicized indicates values estimated by EPA.
          STAR Version 1.0 / LMOP
                                      Decembers, 1998
                             State:  VA
Page:
11

-------
                                                 Frederick County Winchester SLF
                                                                               Landfill Category:  Candidate
A. GENERAL LANDFILL INFORMATION
Landfill Owner:
Landfill Owner Type:
Alternative Landfill Name:
City:
County:
• State:
Year Open:
Year Closed:

Public

Winchester
Frederick
VA
1971
2013
Annual Acceptance Rate (tons):
Year Annual Acceptance Rate Reported:
Design Capacity (tons):
Acres Currently Landfilled (acres):
Average Depth (feet):
Waste-in-Place (tons):
7998 Waste-in-Place (tons):

121,550




3,160,300
3,160,300

B. LANDFILL GAS COLLECTION
Estimated Methane Generation (mmscf/d):
LFG Collection System Status:
Current LFG Collected (mmscf/d):
Collection and Treatment System Required Under NSPS/EG:
                                                   1.23
                                                    No
                                               C.LANDFILL GAS UTILIZATION
Current Utilization:
    Utilization System Status:
    Utilization System Type:
    Utilization System Start Year:
    Electric Utility Provider(s):
    Natural Gas Provider(s):
    Energy Purchaser(s):

Capacity:
                Potential
                Leachate Evaporation
Electricity Generation Project (MW)
                                                          OR
Direct Use Project (mmBtu/hr)
Estimated Potential Capacity:
Current Capacity:
Planned Capacity:
4 3S
Utilities in County: Potomac Edison Co; Southeastern Power Admin
^..^itR^-'^-^'li'.-^AT'- l'i P-i^mpMEisri^LBENEFrrc "".,'„%, . ;3 :- : _\
Methane Reduction (tons/yr):
CO2 Equivalent ofCH4 Reduction (tons/yr):
Emissions Avoided by Fossil Fuel Displacement:
Potential
7,090
148,892
Electricity Generation Project
C02 (tonsA'r) SO2 (tons/yr)
Current
0
Direct Use Project
CO2 (tons/w) SO2 (tons/vr)
                                      Coal:
                                   Fuel Oil:
                                Natural Gas:
                                        29,993               190
                                        24,617               159
                                        16,553                 0
                                                             21,351
                                                             17,524
                                                             11,783
                               194
                               102
                                 0
                                                 E. CONTACT INFORMATION
                                       Landfill Owner
                                                                        Landfill Operator
Contact Name:
Mailing Address:

Phone Number:
Fax Number:
Ed Strawsynder, Director of Public Works
107 North Kent Street

703-667-2365
                                   9 North Loudoun Street
                                   2nd floor
* Itallicized indicates values estimated by EPA.
  I,
<4»»«  STAR Version 1.0 / LMOP
  p.
                                                                 Decembers, 1998
                                                                            State:  VA
                                                                       Page:
                                12

-------
                                                          Greene County
                                                                          Landfill Category:  Candidate
                                           A. GENERAL LANDFILL INFORMATION
Landfill Owner:
Landfill Owner Type:
Alternative Landfill Name:
City:
County:
State:
Year Open:
Year Closed:
Greene County
Public
Greene County LF
Stanardsville
Greene
VA
Annual Acceptance Rate (tons):
Year Annual Acceptance Rate Reported:
Design Capacity (tons):
Acres Currently Landfilled (acres):
Average Depth (feet):
Waste-in-Place (tons):
1998 Waste-in-Place (tons):
                                              ^B.:LANDFILL GAS COLLECTION
Estimated Methane Generation (mmscf/d):
LFG Collection System Status:
Current LFG Collected (mmscf/d):
Collection and Treatment System Required Under NSPS/EG:
                                          Planned
                                               No
                                              rfC. LANDFILL GAS UTILIZATION
Current Utilization:
     Utilization System Status:
     Utilization System Type:
     Utilization System Start Year:
     Electric Utility Provider(s):
     Natural Gas Provider(s):
     Energy Purchaser(s):

Capacity:
          Planned
          Reciprocating Engine
          2000
             Electricity Generation Project (MW)
            OR
Direct Use Project (mmBtu/hr)
     Estimated Potential Capacity:
     Current Capacity:
     Planned Capacity:
                                               .3
uuimcb HI v^uumy. v_ciiuai viigima cieuuii; ^uup, nappaiiaimucK cjccuii; \_-uup, ouuuicaMciu rowci /-VUIIIJM, viigmia E
'- , ' 'S'-^t, •- '• ^:'^]>':D.ENVWOMEOTAL-BENEFrrs;OF UTILIZATION: -. •••*/:. *•<; '.'-. • .••.-.
Ft ,.;'• ' J, _± ,,,. • .': . , - "- ,,.", • • ' •,,,-!'!,,.?!-!# •>. •. . ,/ ,-- •.',.'! 'I : , •' I-",:,:--, •;••,- •;••:' ' ' ':' :
Methane Reduction (tons/yr):
CO2 Equivalent ofCH4 Reduction (tons/yr):
Emissions Avoided by Fossil Fuel Displacement:
Coal:
Fuel Oil:
Natural Gas:
Potential
Electricity Generation Project
C02 (tons/yr) SO2 (tons/yr)
Current
Direct Use Project
CO2 (tons/yr) SO2 (tons/yr)
JV "•>.; E. CONTACT INFORMATION -' . t? . ;
Landfill Owner Landfill Operator
Contact Name: ;
Mailing Address:
Phone Number: ; 804-985-7803
Fax Number: i
* Itallicized indicates values estimated by EPA.
         STAR Version 1.0 / LMOP
                                       Decembers, 1998
                              State:  VA
                     Page:
13

-------
                                                Independent Hill LF Prince William
                                                                              Landfill Category:    Current
                                          A. GENERAL LANDFILL INFORMATION
Landfill Owner:
Landfill Owner Type:
Alternative Landfill Name:
City:
County:
State:
Year Open:
Year Closed:
      Prince William County
      Public
      Prince William County LF
      Prince William
      Prince William
      VA
      1971
      2021
Annual Acceptance Rate (tons):
Year Annual Acceptance Rate Reported:
Design Capacity (tons):
Acres Currently Landfilled (acres):
Average Depth (feet):
Waste-in-Place (tons):
7995 Waste-in-Place (tons);
                            171,600  ;
                               860  :
                                              B. LANDFILL GAS COLLECTION
Estimated Methane Generation (mmscf/d):
LFG Collection System Status:
Current LFG Collected (mmscf/d):
Collection and Treatment System Required Under NSPS/EG:
                                                    No
                                              C. LANDFIIJ>GAS UTILIZATION
Current Utilization:
    Utilization System Status:
    Utilization System Type:
    Utilization System Start Year:
    Electric Utility Provider(s):
    Natural Gas Provider(s):
    Energy Purchaser(s):

Capacity:
                Construction
                Reciprocating Engine
                1998
                Northern Virginia Electric Corp

                   Electricity Generation Project (MW)
           OR
Direct Use Project (mmBtu/hr)
    Estimated Potential Capacity:
    Current Capacity:
    Planned Capacity:
Utilities in County:
                Northern Virginia Elec Coop; Southeastern Power Admin; Virginia Electric & Power Co
                                      D. ENVIRO3VIENTAL BENEFITS OF UTILIZATION
Methane Reduction (tons/yr):
CO2 Equivalent ofCH4 Reduction (tons/yr):
                                                                Potential
                                                                                    Current
Emissions Avoided by Fossil Fuel Displacement:

                                      Coal:
                                   Fuel Oil:
                                Natural Gas:
                                  Electricity Generation Project
                                 C02 (tons/yr)       SO2 (tons/yr)
                                 Direct Use Project
                           CO2 (tons/yr)       SO2 (tons/yr)
                                                E. CONTACT INFORMATION
                                       Landfill Owner
                                                                       Landfill Operator
Contact Name:
Mailing Address:

Phone Number:
Fax Number:
Thomas Smith
4379 Ridgewood Center Drive

703-792-6254
     |  Thomas Smith
     i
     ;  4379 Ridgewood Center Drive

       703-792-6254
* Itallicized indicates values estimated by EPA.
•O^HM   STAR Version 1.0 / LMOP
  I
                                                                Decembers, 1998
                                                                           State:  VA
                                            Page:
                                14

-------

,,'. .. ..."•'•
Landfill Owner:
Landfill Owner Type:
Alternative Landfill Name:
City:
County:
State:
Year Open:
Year Closed:

. ' -
Loudon County
Public


Loudoun
VA
1971
2010
Loudoun County LF Landfill Category:
A. GENERAL LANDFILL INFORMATION
Annual Acceptance Rate (tons):
Year Annual Acceptance Rate Reported:
Design Capacity (tons):
Acres Currently Landfilled (acres):
Average Depth (feet):
Waste-in-Place (tons):
1998 Waste-in-Place (tons):

Candidate
'\' ';
57,200


88

1,487,200
1,487,200

r ' , B. LANDFILL GAS COLLECTION , ,;"„ '> |
Estimated Methane Generation (mmscf/d):
LFG Collection System Status:
Current LFG Collected (mmscf/d):
Collection and Treatment System Required Under NSPS/EG:
                                                    0.80
                                                      No
                                              C. LANDFILL GAS UTILIZATION
Current Utilization:
    Utilization System Status:
    Utilization System Type:
    Utilization System Start Year:
    Electric Utility Provider(s):
    Natural Gas Provider(s):
    Energy Purchaser(s):

Capacity:
                 Unknown
                 Unknown
                    Electricity Generation Project (MW)
    OR
Direct Use Project (mmBtu/hr)
    Estimated Potential Capacity:
    Current Capacity:
    Planned Capacity:
                                                                                                      25
Utilities in County:
                 Northern Virginia Elec Coop; Southeastern Power Admin; Virginia Electric & Power Co
                                      D. ENVIROMENTAL BENEFITS OF UTILIZATION
Methane Reduction (tons/yr):
CO2 Equivalent ofCH4 Reduction (tons/yr):
                                                                 Potential
                                                              4,616
                                                             96,934
                                                                                       Current
Emissions Avoided by Fossil Fuel Displacement:

                                      Coal:
                                   Fuel Oil:
                               Natural Gas:
                                   Electricity Generation Project
                                  CO2 (tons/yr)       SO2 (tons/yr)
                                         19,732                125
                                         16,195                104
                                         10,890                 0
                          Direct Use Project           j
                    CO2 (tons/yr)        SO2 (tons/yr)  \
                           13,900               127
                           11,409                67
                            7,671                 0
                                                E. CONTACT INFORMATION
                                       Landfill Owner
                                                                         Landfill Operator
Contact Name:
Mailing Address:

Phone Number:
Fax Number:
 Richard S. Webber, Department Engineer
| 750 Miller Drive
'. Suite 200
 703-771-5200
Robert Montgomery
750 Miller Drive
Suite 200
703-771-5200
* Itallicized indicates values estimated by EPA.

<$•««  STAR Version ' -° ' LMOP
  |
                                                                Decembers, 1998
                                                                             State:  VA
                                     Page:
                                 15

-------


Lynchburg City LF Landfill Category:
Candidate
A. GENERAL LANDFILL INFORMATION
Landfill Owner:
Landfill Owner Type:
Alternative Landfill Name:
City:
County:
State:
Year Open:
Year Closed:
Lynchburg City
Public

Lynchburg
Lynchburg
VA
1979
1995
Annual Acceptance Rate (tons):
Year Annual Acceptance Rate Reported:
Design Capacity (tons):
Acres Currently Landfilled (acres):
Average Depth (feet):
Waste-in-Place (tons):
1998 Waste-in-Place (tons):

85,800




1,544,400
1,544,400

B. LANDFILL GAS COLLECTION
 Estimated Methane Generation (mmscf/d):
 LFG Collection System Status:
 Current LFG Collected (mmscf/d):
 Collection and Treatment System Required Under NSPS/EG:
                                                    0.81
                                                     No
                                                C. LANDFILL GAS UTILIZATION
 Current Utilization:
     Utilization System Status:
     Utilization System Type:
     Utilization System Start Year:
     Electric Utility Provider(s):
     Natural Gas Provider(s):
     Energy Purchaser(s):

, Capacity:
                Planned
                Direct Thermal
                2000
                Rock Tenn
                   Electricity Generation Project (MW)
    OR
Direct Use Project (mmBtu/hr)
Estimated Potential Capacity: 3 25
Current Capacity:
Planned Capacity:
Utilities in County: Appalachian Power Company; Southeastern Power Admin
- ; -" •" IV ';;>*|f>| - /, D.ENVIROMENTAL BENEFITS OF UTILIZATION, - : ; '
Methane Reduction (tons/yr):
CO2 Equivalent ofCH4 Reduction (tons/yr):
Emissions Avoided by Fossil Fuel Displacement:
Coal:
Fuel Oil:
Natural Gas:
Potential
4,701
98,711
Electricity Generation Project
CO2 (tons/yr) SO2 (tons/yr)
19,732 125
16,195 104
10,890 . 0
Current
0
0
Direct Use Project
CO2 (tons/yr) SO2 (tons/yr)
14,155 129
11,618 68
7,812 0
/; E. CONTACT INFORMATION
Landfill Owner Landfill Operator
 Contact Name:       | , City Manager
                     i
 Mailing Address:     ! PO Box 60
                                                       PO Box 60
 Phone Number:
 Fax Number:
804-847-1659
804-847-1659
* Itallicized indicates values estimated by EPA.
  /.
<%**«  STAR Version 1.0 / LMOP
  :*
                                                                   Decembers, 1998
                                                                             State:  VA
                                     Page:
                                16

-------


Maplewood Recycling and Waste Disposal Facility Landfill Category.
Candidate
; A. GENERAL LANDFILL INFORMAHONV ;
Landfill Owner:
Landfill Owner Type:
Alternative Landfill Name:
City:
County:
State:
Year Open:
Year Closed:

i.' ;..'. -,,

Private
Chambers
Amelia
Amelia
VA
1993
2011

„;•'
Annual Acceptance Rate (tons):
Year Annual Acceptance Rate Reported:
Maplewood RDF Design Capacity (tons):
Acres Currently Landfilled (acres):
Average Depth (feet):
Waste-in-Place (tons):
7998 Waste-in-Place (tons):


,:-. B. LANDFILL GAS COLLECTION v, i f,
1,430,000

25,794,841
404

5,720,000
5,720,000


•1
Estimated Methane Generation (mmscf/d):
LFG Collection System Status:
Current LFG Collected (mmscf/d):
Collection and Treatment System Required Under NSPS/EG:
                                                     1.88
                                                      No
                                               C. LANDFILL GAS UTILIZATION,
Current Utilization:
     Utilization System Status:
     Utilization System Type:
     Utilization System Start Year:
     Electric Utility Provider(s):
     Natural Gas Provider(s):
     Energy Purchaser(s):

Capacity:
                Planned
                Unknown
                    Electricity Generation Project (MW)
    OR
Direct Use Project (mmBtu/hr)
Estimated Potential Capacity:
Current Capacity:
Planned Capacity:
Utilities in County:
6 59
Southeastern Power Admin; Southside Electric Coop Inc; Virginia Electric & Power Co
r> , f ,f *-f, •' '"' '"-, D.ENyiROMENTALBENFJPITSOFIJTILIZATIOlS! " ; ;, - -' ' '- '
Methane Reduction (tons/yr):
C02 Equivalent ofCH4 Reduction (tons/yr):
Emissions Avoided by Fossil Fuel Displacement:
Coal:
Fuel Oil.-
Natural Gas:


Contact Name: j Lee Wilson
Mailing Address: PO Box 1 68
Potential
10,875
228,381
Electricity Generation Project
CO2 (tons/yr) SO2 (tons/yr)
46,567 294
38,220 246
25,700 0
Current
0
0
Direct Use Project
CO2 (tons/yr) SO2 (tons/yr)
32,750 298 '
26,879 157 j
18,074 0 '
E. CONTACT INFORMATION • \
Landfill Owner Landfill Operator j
' Ronald Beaton 1
PO Box 168
Phone Number:

Fax Number:
804-561-5787
804-561-5787
* Itallicized indicates values estimated by EPA.
         STAR Version 1 .0 / LMOP
                                              Decembers, 1998
  I
                       State:  VA
                     Page:
17

-------
Martinsville City LF Landfill Category: Candidate
A. GENERAL LANDFILL INFORMATION
Landfill Owner:
Landfill Owner Type:
Alternative Landfill Name:
City:
County:
State:
Year Open:
Year Closed:



Public

Martinsville
Martinsville
VA
1972



Annual Acceptance Rate (tons): 92,950
Year Annual Acceptance Rate Reported:
Design Capacity (tons):
Acres Currently Landfilled (acres):
Average Depth (feet):
Waste-in-Place (tons): 2,323,750
1998 Waste-in-Place (tons): 2,323,750

B. LANDFILL GAS COLLECTION |

Estimated Methane Generation (mmscf/d):
LFG Collection System Status:
Current LFG Collected (mmscf/d):
Collection and Treatment System Required Under NSPS/EG:
                                                   1.01
                                                    No
                                               C. LANDFILL GAS UTILIZATION
Current Utilization:
    Utilization System Status:
    Utilization System Type:
    Utilization System Start Year:
    Electric Utility Provider(s):
    Natural Gas Provider(s):
    Energy Purchaser(s):

Capacity:
                Potential
                Unknown
                   Electricity Generation Project (MW)
OR
Direct Use Project (mmBtu/hr)
Estimated Potential Capacity: \ 3
Current Capacity:
Planned Capacity: 1
I
32
Utilities in County:
i^|<:::4;,;;j:;aie
Southeastern Power Admin
,";i; : ;H< D;ENyiROMENTAL BENEFITS OF
Methane Reduction (tons/yr):
CO2 Equivalent ofCH4 Reduction (tons/yr):
Emissions Avoided by Fossil Fuel Displacement:
Coal:
Fuel Oil:
Natural Gas:
Potential

UTILIZATION u:J ';! ••;₯ f C' '~-\ "-;> ':%/-/^, '* l^' ' !.; ~>,:
5,853
122,913
Electricity Generation Project
CO2 (tons/yr) SO2 (tons/yr)
25,257 160
20,730 133
13,939 0
Current
0
0
Direct Use Project
CO2 (tons/yr) SO2 (tons/yr)
17,625 160
14,466 84
9,727 0
i • ;- -T:?:-- • <;- - ~v E. CONTACT INFORMATION - ' ^ '"'-.f\ ;i|

Contact Name:
Mailing Address:
Landfill Owner
Jeff Joyce, City Manager j
i
PO Box 112 |
Landfill Operator
55 West Church Street
Phone Number:
Fax Number:
540-656-5177
* Itallicized indicates values estimated by EPA.
          STAR Version 1.0/LMOP
                                                                 Decembers, 1998
                                                                            State:  VA
                                 Page:
                                18

-------
Newport News LF Landfill Category: Candidate
A. GENERAL LANDFILL INFORMATION
Landfill Owner:
Landfill Owner Type:
Alternative Landfill Name:
City:
County:
State:
Year Open:
Year Closed:
City of Newport
Public

Newport News

VA
1984
1998
News Annual Acceptance Rate (tons):
Year Annual Acceptance Rate Reported:
Design Capacity (tons):
Acres Currently Landfilled (acres):
Average Depth (feet):
1998 Waste-in-Place (tons):
1998 Waste-in-Place (tons):

0
1998

50
80
1,250,000
1,250,000

? •: - ' , j* - - ' B. LANDFILL GAS COLLECTION ,%-.,,, '
Estimated Methane Generation (mmscf/d):
LFG Collection System Status:
Current LFG Collected (mmscf/d):
Collection and Treatment System Required Under NSPS/EG:
                                                   0.74
                                                    No
                                              C. LANDFILL GAS UTILIZATION
Current Utilization:
    Utilization System Status:
    Utilization System Type:
    Utilization System Start Year:
    Electric Utility Provider(s):
    Natural Gas Provider(s):
    Energy Purchaser(s):

Capacity:
                Unknown
                Unknown
                   Electricity Generation Project (MW)
    OR
Direct Use Project (mmBtu/hr)
Estimated Potential Capacity: 2 23
Current Capacity:
Planned Capacity:
Utilities in County:
; .?|<|.^vir^<:.; ' <' -•
Methane Reduction (tons/yr):
CO2 Equivalent ofCH4 Reduction (tons/yr):
Emissions Avoided by Fossil Fuel Displacement:
Coal:
Fuel Oil:
Natural Gas:
Potential Current
4,265 0
89,567 0
Electricity Generation Project Direct Use Project
CO2 (tons/yr) SO2 (tons/yr) CO2 (tons/yr) SO2 (tons/yr)
18,153 115 12,844 117
14,899 96 10,542 61
10,019 0 7,088 0
l{ E. CONTACTINFORMATION i :
Landfill Owner Landfill Operator
Contact Name: David Sinclair ' David Sinclair
Mailing Address: 513 Oyster Point Road 513 Oyster Point Road
Phone Number:

Fax Number:
757-886-7948
757-886-7948
* Itallicized indicates values estimated by EPA.
-4»»s  STAR Versi°n ] -°; LM°P
  f-
                                                                 Decembers, 1998
                                                                            State:  VA
                                     Page:
                                 19

-------
                                          Newport News Solid Waste Disposal Facility No. 2
                                                                        Landfill Category:  Candidate
                                          A. GENERAL LANDFILL INFORMATION
Landfill Owner:
Landfill Owner Type:
Alternative Landfill Name:
City:
County:
State:
Year Open:
Year Closed:
Public
Newport News City LF
Newport News
Newport News
VA
1984
1996
                           Annual Acceptance Rate (tons):
                           Year Annual Acceptance Rate Reported:
                           Design Capacity (tons):
                           Acres Currently Landfilled (acres):
                           Average Depth (feet):
                            1998 Waste-in-Place (tons): .
                           1998 Waste-in-Place (tons):
                                                                                           171,600
                                80
                          1,250,000
                          1,250,000
                                              B. LANDFILL GAS COLLECTION
Estimated Methane Generation (mmscf/d):
LFG Collection System Status:
Current LFG Collected (mmscf/d):
Collection and Treatment System Required Under NSPS/EG:
                                             0.74
                                              No
                                              C.:LANDFILL GAS IFTILIZATJON <
Current Utilization:
     Utilization System Status:
     Utilization System Type:
     Utilization System Start Year:
     Electric Utility Provider(s):
     Natural Gas Provider(s):
     Energy Purchaser(s):

Capacity:
         Planned
         Reciprocating Engine
         1999
Electricity Generation Project (MW)
                                                   OR
Direct Use Project (mmBtu/hr)
; Estimated Potential Capacity: 2 23
Current Capacity:
Planned Capacity:
i
Utilities in County: Southeastern Power Admin; Virginia Electric & Power Co
| :• ; - , •-".- ; '"• !' ." D;ENVmOMENTALBENEFrrSpFOTILIZATJON ';, ' .'-' • " ' =; '->V V :./»,',:.•'• -
Methane Reduction (tons/yr):
CO2 Equivalent ofCH4 Reduction (tons/yr):
Emissions Avoided by Fossil Fuel Displacement:
Coal:
Fuel Oil:
Natural Gas:
j.J.-"!V-'. "•/:t?vX'C >*';'V- :'*'':"• ;>- 4,- '=-=;;
Potential
4,265
89,567
Electricity Generation Project
CO2 (tons/yr) SO2 (tons/yr)
18,153 115
14,899 96
10,019 0
Current
0
0
Direct Use Project
CO2 (tons/yr) SO2 (tons/yr)
12,844 117
10,542 61
7,088 0
:E; CONTACT INFORMATION j 'j-.C. ; pf r" ;:„;#, , ;;;1 •*•;:-', /':' ;< . \ *; ^>\
Landfill Owner Landfill Operator
Contact Name: David Sinclair, Solid Waste Administrator David Sinclair
Mailing Address: 2400 Washington Avenue 2400 Washington Avenue
Phone Number: 804-249-5700 804-249-5700
Fax Number:
t
* Itallicized indicates values estimated by EPA.
          STAR Version 1.0 / LMOP
                                      Decembers, 1998
                                                         State:  VA
                     Page:
20

-------
Nuckols Road LF Landfill Category: Candidate
A. GENERAL LANDFILL INFORMATION ; J
Landfill Owner:
Landfill Owner Type:
Alternative Landfill Name:
City:
County:
State:
Year Open:
Year Closed:
Henrico County
Public
Springfield Road
Richmond
Henrico
VA
1965
1990
Annual Acceptance Rate (tons):
Year Annual Acceptance Rate Reported:
LF #1 Design Capacity (tons):
Acres Currently Landfilled (acres):
Average Depth (feet):
1998 Waste-in-Place (tons):
1998 Waste-in-Place (tons):

114,400


92
70
2,745,600
2,745,600

; , - B. LANDFILL GAS COLLECTION -^ *» -lit-; -1
Estimated Methane Generation (mmscf/d):
LFG Collection System Status:
Current LFG Collected (mmscf/d):
Collection and Treatment System Required Under NSPS/EG:
                                    1.04
                             Operational

                                     No
                                               C. LANDFILL GAS UTILIZATION
Current Utilization:
     Utilization System Status:
     Utilization System Type:
     Utilization System Start Year:
     Electric Utility Provider(s):
     Natural Gas Provider(s):
     Energy Purchaser(s):

Capacity:
Planned
Unknown
Virginia Electric & Power Co

   Electricity Generation Project (MW)
OR
Direct Use Project (mmBtu/hr)
Estimated Potential
Current Capacity:
Planned Capacity:
Utilities in County:
/ ' ' ";" '' , " :• '/ '*',/'"'' ' ' ''" \
Capacity:
3
32
Southeastern Power Admin; Virginia Electric & Power Co
l%~%. ;|!; -^4, ;';5 ;,p/ENVIROMENTAL BENEFITS 'OF UTILIZATION . ^ ;; •• ^ }.,<- „?, '1; -">; <: ',:„. "%>% V, :' ,; '^ V; l^
                                                                  Potential
                                                                       Current
Methane Reduction (tons/yr):
CO2 Equivalent ofCH4 Reduction (tons/yr):
Emissions Avoided by Fossil Fuel Displacemen
Co
FuelC
5,990
125,782
(: Electricity Generation Project
CO2 (tons/yr) SO2 (tons/yr)
al: 25,257 160
W: 20,730 133
0
0
Direct Use Project
CO2 (tons/yr) SO2 (tons/yr)
18,037 164
14,804 86
Natural Gas: 13,939 0 9,954 0
E. CONTACT INFORMATION ^ . f i
Landfill Owner Landfill Operator
Contact Name: , Director Public Works
Mailing Address: 41 ODabbs House Road

Phone Number: 804-672-4393
Fax Number:

Parham and Hungary Springs Rd
PO Box 27032
804-672-4393
i
* Itallicized indicates values estimated by EPA.
      *   STAR Version 1.0 / LMOP
                             Decembers, 1998
                  State:  VA
                     Page:
21

-------
                                                      Old Dominion Landfill
                                                                         Landfill Category:    Current
                                           A. GENERAL LANDFILL INFORMATION
Landfill Owner:
Landfill Owner Type:
Alternative Landfill Name:
City:
County:
State:
Year Open:
Year Closed:
BFI                                     Annual Acceptance Rate (tons):
Private                                  Year Annual Acceptance Rate Reported:
Richmond Landfill Gas Project; Richmond L  Design Capacity (tons):
Richmond                               Acres Currently Landfilled (acres):
Henrico                                 Average Depth (feet):
VA                                     Waste-in-Place (tons):
                                        1998 Waste-in-Place (tons):
                                              B. LANDFILL GAS COLLECTION
Estimated Methane Generation (mmscf/d):
LFG Collection System Status:
Current LFG Collected (mmscf/d):
Collection and Treatment System Required Under NSPS/EG:
                                       Operational
                                              0.9
                                              No
                                               C. LANDFILL GAS UTILIZATION
Current Utilization:
     Utilization System Status:
     Utilization System Type:
     Utilization System Start Year:
     Electric Utility Provider(s):
     Natural Gas Provider(s):
     Energy Purchaser(s):

Capacity:
         Operational
         Reciprocating Engine
         1993
         Virginia Electric & Power Co

             Electricity Generation Project (MW)
OR
Direct Use Project (mmBtu/hr)
    Estimated Potential Capacity:
    Current Capacity:
    Planned Capacity:
                                             2.9
                                          19
Utilities in County:
          Southeastern Power Admin; Virginia Electric & Power Co
                                    ;  D. ENVIROMENTAL BENEFITS OF UTILIZATION
Methane Reduction (tons/yr):
CO2 Equivalent ofCH4 Reduction (tons/yr):
                                                                  Potential
                                                                               Current
Emissions Avoided by Fossil Fuel Displacement:

                                      Coal:    \
                                   Fuel Oil:
                                Natural Gas:
                            Electricity Generation Project
                           C02 (tons/yr)        SO2 (tons/yr)
                      Direct Use Project
                CO2 (tons/yr)       SO2 (tons/yr)
                                                 E. CONTACT INFORMATION
                                       Landfill Owner
                                                                  Landfill Operator
Contact Name:

Mailing Address:

Phone Number:

Fax Number:
* Itallicized indicates values estimated by EPA.
  A
         STAR Version 1 -0 / LMOP
                                      Decembers, 1998
                  State:  VA
                     Page:
22

-------

£• '':: • vX ,
L:. - !, -'•;• 	 :•-,-.
Landfill Owner:
Landfill Owner Type:
Alternative Landfill Name:
City:
County:
State:
Year Open:
Year Closed:

A;
City of Petersburg
Public

Petersburg
Petersburg
VA
1977
2002
Petersburg City LF Landfill Category:
GENERAL LANDFILL INFORMATION
Annual Acceptance Rate (tons):
Year Annual Acceptance Rate Reported:
Design Capacity (tons):
Acres Currently Landfilled (acres):
Average Depth (feet):
Waste-in-Place (tons):
1998 Waste-in-Place (tons):

Candidate

57,200


75

1,144,000
1,144,000

1 - "'„* ,:B. LANDFILL GAS COLLECTION, •.•-•||r •• -^ ;,, -: "\
Estimated Methane Generation (mmscf/d):
LFG Collection System Status:
Current LFG Collected (mmscf/d):
Collection and Treatment System Required Under NSPS/EG:
                                                   0.71
                                                     No
                                             1C. LANDFILL GAS UTILIZATION
Current Utilization:
    Utilization System Status:
    Utilization System Type:
    Utilization System Start Year:
    Electric Utility Provider(s):
    Natural Gas Provider(s):
    Energy Purchaser(s):

Capacity:
                Unknown
                Unknown
                   Electricity Generation Project (MW)
    OR
Direct Use Project (mmBtu/hr)
    Estimated Potential Capacity:
    Current Capacity:
    Planned Capacity:
                                                                                                     22
Utilities in County:
                Southeastern Power Admin; Southside Electric Coop Inc; Virginia Electric & Power Co
                                      D. ENVmOMENTAL BENEFITS OF UTILIZATION
Methane Reduction (tons/yr):
CO2 Equivalent ofCH4 Reduction (tons/yr):
Emissions Avoided by Fossil Fuel Displacement:
Coal:
Fuel Oil.-
Natural Gas:
Potential
4,108
86,276
Electricity Generation Project
CO2 (tons/yr) SO2 (tons/yr)
17,364 110
14,252 92
9,583 0
Current
0
0
Direct Use Project
CO2 (tons/yr) SO2 (tons/yr)
12,372 113
10,154 59
6,828 0
•:j | • E. CONTACT INFORMATION ' j

Contact Name:
Mailing Address:

i
j Charles Dane
. 390 Industrial Drive
Landfill Owner


Charles Dane
390 Industrial Drive
Landfill Operator

Phone Number:
Fax Number:
804-733-2417
804-733-2417
* Itallicized indicates values estimated by EPA.
         STAR Version 1.0 / LMOP
                                             Decembers, 1998
      State:  VA      Page:
                                                 23

-------
                                                         SPSA Regional LF
                                                                         Landfill Category:    Current
                                           A. GENERAL LANDFILL INFORMATION
Landfill Owner:
Landfill Owner Type:
Alternative Landfill Name:
City:
County:
State:
Year Open:
Year Closed:
SPSA
Public
Suffolk Regional LF
Suffolk

VA
1985
2015
Annual Acceptance Rate (tons):
Year Annual Acceptance Rate Reported:
Design Capacity (tons):
Acres Currently Landfilled (acres):
Average Depth (feet):
 1998 Waste-in-Place (tons):
1998 Waste-in-Place (tons):
                           410,000
                              1998

                               308
                               140
                          6,357,700
                          6,357,700
                                               B. LANDFILL GAS COLLECTION
Estimated Methane Generation (mmscf/d):
LFG Collection System Status:
Current LFG Collected (mmscf/d):
Collection and Treatment System Required Under NSPS/EG:
                                             2.04
                                       Operational
                                              1.8
                                             Yes
                                               C. LANDFILL GAS UTILIZATION
Current Utilization:
    Utilization System Status:
    Utilization System Type:
    Utilization System Start Year:
    Electric Utility Provider(s):
    Natural Gas Provider(s):
    Energy Purchaser(s):

Capacity:
          Operational
          Reciprocating Engine
          1995
          Virginia Power
          Commonwealth Gas
          Virginia Power

             Electricity Generation Project (MW)
           OR
Direct Use Project (mmBtu/hr)
Estimated Potential Capacity: 6 64
Current Capacity: 3.2 38
Planned Capacity:
Utilities in County: Southeastern Power Admin; Virginia Electric & Power Co
;•;••; " .;: ;-„;-.--/" •;:.--'".-,- '•- 'D.ENVmpMENTAL BENEFITS OF UTILIZATION ".;, ; ->;r,. /;; '= ..;--: ;' - ;
Methane Reduction (tons/yr):
CO2 Equivalent ofCH4 Reduction (tons/yr):
Emissions Avoided by Fossil Fuel Displacement:
Coal:
Fuel OiL-
Natural Gas:
Potential
11,818
248,184
Electricity Generation Project
CO2 (tons/yr) SO2 (tons/yr)
50,514 319
41,459 267
27,878 0
Current
6,938
145,696
Direct Use Project
CO2 (tons/yr) SO2 (tons/yr)
35,589 324
29,210 170
19,641 0
1- ' • ,, E. CONTACT INFORMATION .- ..;•-•••
Landfill Owner Landfill Operator
Contact Name: Dan Miles Dan Miles
Mailing Address: • 723 Woodlake Drive
723 Woodlake
Phone Number: 757-420-4700 757-420-4700
Fax Number:
* ttallicized indicates values estimated by EPA.
  !.
         STAR Version 1.0 / LMOP
                                       Decembers, 1998
                             State:  VA
                     Page:
24

-------


SPSA Regional LF Landfill Category:
Current
i A. GENERAL LANDFILL INFORMATION . - "
Landfill Owner:
Landfill Owner Type:
Alternative Landfill Name:
City:
County:
State:
Year Open:
Year Closed:
SPSA
Public
Suffolk Regional
Suffolk

VA
1985
2015
Annual Acceptance Rate (tons):
Year Annual Acceptance Rate Reported:
LF Design Capacity (tons):
Acres Currently Landfilled (acres):
Average Depth (feet):
1998 Waste-in-Place (tons):
1998 Waste-in-Place (tons):

410,000
1998

308
140
6,357,700
6,357,700

i , -!V> .';-:,< / ; B; LANDFILL GAS COLLECTION *<'<,-.
Estimated Methane Generation (mmscf/d):
LFG Collection System Status:
Current LFG Collected (mmscf/d):
Collection and Treatment System Required Under NSPS/EG:
                                    2.04

                                      1.8
                                     Yes
                                                C. LANDFILL GAS UTILIZATION
Current Utilization:
     Utilization System Status:
     Utilization System Type:
     Utilization System Start Year:
     Electric Utility Provider(s):
     Natural Gas Provider(s):
     Energy Purchaser(s):

Capacity:
Operational
Leachate Evaporation
1995
Virginia Power
Commonwealth Gas
Virginia Power

   Electricity Generation Project (MW)
OR
Direct Use Project (mmBtu/hr)
Estimated Potential Capacity: 6 64
Current Capacity: 38
Planned Capacity:
I
Utilities in County:
-,;;,;, Ji|;^n;j^Y'>"•'
Methane Reduction (tons/yr):
CO2 Equivalent ofCH4 Reduction (tons/yr):
Emissions Avoided by Fossil Fuel Displacement:
Coal:
Fuel Oil:
Natural Gas:
Potential
11,818
248,184
Electricity Generation Project
CO2 (tons/yr) SO2 (tons/yr)
50,514 319
41,459 267
27,878 0
Current
6,938
145,696
Direct Use Project
CO2 (tons/yr) SO2 (tons/yr)
35,589 324
29,210 170 i
19,641 0
ij E. CONTACT INFORMATION •
Landfill Owner Landfill Operator
Contact Name: Dan Miles Dan Miles
Mailing Address: \ 723 Woodlake Drive
723 Woodlake
Phone Number: 757-420-4700 ; 757-420-4700
Fax Number:
* Italliciied indicates values estimated by EPA.
  A
•*%»«   STAR Version 1.0 / LMOP
                             Decembers, 1998
                  State:  VA
                     Page:
25

-------

Shoosmith Richmond Area LF Landfill Category:
Candidate
A. GENERAL LANDFILL INFORMATION ]
Landfill Owner:
Landfill Owner Type:
Alternative Landfill Name:
City: Chester
County: Chesterfield
State: VA
Year Open: 1976
Year Closed:
Annual Acceptance Rate (tons):
Year Annual Acceptance Rate Reported:
Design Capacity (tons):
Acres Currently Landfilled (acres):
Average Depth (feet):
Waste-in-Place (tons):
1998 Waste-in-Place (tons):

143,000 '
,

150 ,

3,003,000
3,003,000 \

B. LANDFILL GAS COLLECTION j
Estimated Methane Generation (mmscf/d):
LFG Collection System Status:
Current LFG Collected (mmscf/d):
Collection and Treatment System Required Under NSPS/EG:
                                                   1.19
                                                    No
                                              C. LANDFILL GAS UTILIZATION
Current Utilization:
    Utilization System Status:
    Utilization System Type:
    Utilization System Start Year:
    Electric Utility Provider(s):
    Natural Gas Provider(s):
    Energy Purchaser(s):

Capacity:
                Planned
                Direct Thermal
                1999
                   Electricity Generation Project (MW)
    OR
Direct Use Project (mmBtu/hr)
Estimated Potential Capacity:
Current Capacity:
Planned Capacity:
4
37
Utilities in County: Southeastern Power Admin; Southside Electric Coop Inc; Virginia Electric & Power Co
                                      D. ENVIROMENTAL BENEFITS OF UTILIZATION
Methane Reduction (tons/yr):
CO2 Equivalent ofCH4 Reduction (tons/yr):
Emissions Avoided by Fossil Fuel Displacement:

Coal:
Fuel Oil:

Natural Gas:

Potential
Electricity Generation
6,857
144,005
Project
CO2 (tons/yr) SO2 (tons/yr)
29,203
23,969

16,117

185
154

0

Current
Direct Use Project
CO2 (tons/yr) SO2
20,650
16,949

11,397

0
0

(tons/yr)
188
99

0

* '^-r --V :••<• E. CONTACT INFORMATION '• ' ~',
                                       Landfill Owner
                                                                       Landfill Operator
Contact Name:
Mailing Address:
Tom Gorzycki
11 800 Lewis Road
James McCook
11 800 Lewis Road
Phone Number:
Fax Number:
804-748-5823
804-748-5823
* Itallicized indicates values estimated by EPA.
         STAR Versi«n 1.0 / LMOP
                                            Decembers, 1998
      State:  VA      Page:
  y
                                                26

-------
                                                   Smith Gap Regional Landfill
                                                                         Landfill Category:  Candidate
                                         ! A. GENERAL LANDFILL INFORMATION
Landfill Owner:
Landfill Owner Type:
Alternative Landfill Name:
City:
County:
State:
Year Open:
Year Closed:
Roanoke Valley RA
Public
Roanoke Valley SLF
Roanoke
Roanoke
VA
1974 •
1995
Annual Acceptance Rate (tons):
Year Annual Acceptance Rate Reported:
Design Capacity (tons):
Acres Currently Landfilled (acres):
Average Depth (feet):
Waste-in-Place (tons):
1998 Waste-in-Place (tons):
                            228,800
                          5,262,400
                          5,262,400
                                              B. LANDFILL GAS COLLECTION
Estimated Methane Generation (mmscf/d):
LFG Collection System Status:
Current LFG Collected (mmscf/d):
Collection and Treatment System Required Under NSPS/EG:
                                             1.76
                                              No
                                              C. LANDFILLlGAS UTILIZATION^
Current Utilization:
    Utilization System Status:
    Utilization System Type:
    Utilization System Start Year:
    Electric Utility Provider(s):
    Natural Gas Provider(s):
    Energy Purchaser(s):

Capacity:
         Potential
         Reciprocating Engine

         AEP

         AEP

             Electricity Generation Project (MW)
            OR
Direct Use Project (mmBtu/hr)
1
Estimated Potential Capacity: 6 55
Current Capacity:
Planned Capacity:
Utilities in County: Appalachian Power Company; Craig-Botetourt Electric Coop; Southeastern Power Admin
i- ^ ,'< '' • - ' : D.ENVIROMENTAL BENEFITS OF UTILIZATION " ''*'<-. - '"
? , ~ ? * ~ . ', ~ ^ 	
Methane Reduction (tons/yr):
CO2 Equivalent ofCH4 Reduction (tons/yr):
Emissions Avoided by Fossil Fuel Displacement:
Coal:
Fuel Oil:
Natural Gas:
Potential
10,199
214,171
Electricity Generation Project
CO2 (tons/yr) SO2 (tons/yr)
43,410 274
35,629 229
23,958 - 0
Current
0
0
Direct Use Project
CO2 (tons/yr) SO2 (tons/yr)
30,712 279 '
I
25,207 147
16,949 0
ff E. CONTACT INFORMATION ;L
Landfill Owner Landfill Operator
Contact Name: j john Hubbard
i
Mailing Address: ' 1020 Hollins Road j
Phone Number: ! 540-857-5050 > 540-857-5050
1 ,
Fax Number: 1 j
* Itallicized indicates values estimated by EPA.
         STAR Version 1 -° > LMOP
                                      Decembers, 1998
                              State:  VA
                     Page:
27


-------
                                               Virginia Beach LF #2 Mount Trashmore II
                                                                          Landfill Category:   Candidate
                                           A. GENERAL LANDFILL INFORMATION
Landfill Owner:
Landfill Owner Type:
Alternative Landfill Name:
City:
County:
State:
Year Open:
Year Closed:
Public
Annual Acceptance Rate (tons):
Year Annual Acceptance Rate Reported:
Virginia Beach LF II; Virginia Beach LF Nu  Design Capacity (tons):
Virginia Beach                            Acres Currently Landfilled (acres):
Virginia Beach                            Average Depth (feet):
VA
1983
2015
 1994 Waste-in-Place (tons):
1998 Waste-in-Place (tons):
                                                                                            286,000
                               232
                               100
                          6,572,000
                          6,572,000
                                               B. LANDFILL GAS COLLECTION
Estimated Methane Generation (mmscf/d):
LFG Collection System Status:
Current LFG Collected (mmscf/d):
Collection and Treatment System Required Under NSPS/EG:
                                              2.10
                                       Operational
                                               1.5
                                               No
                                                C. LANDFILL GAS IJTILIZATION
Current Utilization:
     Utilization System Status:
     Utilization System Type:
     Utilization System Start Year:
     Electric Utility Provider(s):
     Natural Gas Provider(s):
     Energy Purchaser(s):

Capacity:
          Planned
          High Btu
          1999
             Electricity Generation Project (MW)
            OR
Direct Use Project (mmBtu/hr)
Estimated Potential Capacity: 7 66
Current Capacity:
Planned Capacity: 31
Utilities in County: Southeastern Power Admin; Virginia Electric & Power Co
L ':,:•:'-;•;;',' -.-•'-".-•„ • - -;/.^' -.. D- ENVIROMENTAL BENEFITS OF UTILIZATION '-. .•'•('. '• .„-,-' -~":':-
Methane Reduction (tons/yr):
CO2 Equivalent ofCH4 Reduction (tons/yr):
Emissions Avoided by Fossil Fuel Displacement:
Coal:
Fuel Oil:
Natural Gas:
Potential
12,135
254,841
Electricity Generation Project
CO2 (tons/yr) SO2 (tons/yr)
52,092 329
42,755 275
28,749 0
Current
5,782
121,414
Direct Use Project
CO2 (tons/yr) SO2 (tons/yr)
36,544 333
29,993 175
20,168 0
* E. CONTACT INFORMATION
Landfill Owner Landfill Operator
Contact Name: t City Manager
Mailing Address: Municipal Center Department of Public Works