United States      Office of Air Quality
Environmental Protection  Planning and Standards
Agency        Research Triangle Park NC 27711
                       EMS Report 80-BYC-10
                       August 1981
Air
Benzene Fugitive Leaks
Coke Oven By-Product Plants

Emission Test Report
Republic Steel Corporation
Gadsden, Alabama

-------
DCN 81-222-018-01-18                                EMK Report No. 80-BYC-10
                          EMISSION TEST REPORT

                       FUGITIVE EMISSIONS TESTING

                                 AT THE

                             REPUBLIC STEEL

                              GADSDEN PLANT
                              Prepared by:

            D.P. Wiesenborn, J.I. Steinmetz, and G.E. Harris
                           RADIAN CORPORATION
                          8501 Mo-Pac Boulevard
                          Austin, T&xas   78759
                              Prepared for:

                               Dan Bivins
                  U.S. Environmental Protection Agency
                            ESED/EMB (MD-13)
              Research Triangle Park, North Carolina  27711

                       EPA Contract No. 68-02-3542
                          Work Assignment No. 1
                             ESED No. 74/4J

                            11 September 1981

-------
                                 CONTENTS

Section                                                                Page

   1     Introduction 	     1

   2     Summary of Results 	     2

   3     Process Description	...     6

   4     Methodology 	     8

         4.1  Screening Procedures 	     8
         4.2  Sampling Procedures 	     9
         4.3  Analytical Techniques 	    12

   5     Quality Control/Quality Assurance 	    13

         5.1  Quality Control for Screening Procedures 	    13
         5.2  Quality Control for Analytical and sampling procedures.    15
              5.2.1  Blind Standards 	    15
              5.2.2  Accuracy Checks	    16

   Appendix A 	    21

   Appendix B 	    35

-------
                                 FIGURES




Number                                                               Page




 3-1   Light oil recovery unit,  Republic  Steel 	     7




 4-1   Sampling train for baggable source of  hydrocarbon emissions  .   10




 5-1   Mass spectrum of pure benzene on SP-2100/bentone column  	   17




 5-2   Mass spectrum of light oil product on  SP-2100/bentone  	   18




 5-3   Mass spectrum of light oil product on  TCEP 	   19
                                   ii

-------
                                   TABLES

Number                                                                  Page

 2-1    OVA screening value distribution:  Republic Steel,
             Gadsden Plant 	     3

 2-2    Summary of benzene and non-methane hydrocarbon leak rates
             (Ib/hr) from sampled sources:  Republic Steel Gadsden
             Plant 	     4
 2-3    Comparison of benzene content in emissions and in liquid
             lines:  Republic Steel Gadsden Plant 	     5

 5-1    Calibration checking of OVA and TLV 	    14

 5-2    Blind standards data listing 	    16

 5-3    Accuracy checks data listing 	    20
                                    iii

-------
                                  SECTION 1
                                INTRODUCTION
     This report presents the results of testing for fugitive VOC (Volatile
Organic Compounds) and benzene emissions at the Republic Steel plant in Gadsden,
Alabama.  The testing was performed by Radian Corporation on December 8 through
December 12, 1980.

     This work was funded and administered by the Emission Measurement Branch
of the U.S. Environmental Protection Agency under Contract No. 68-02-3542.  The
results of this testing may be used in support of a National Emission Standard
for Hazardous Air Pollutants for benzene from coke oven by-products recovery
units in steel mills.

     Potential sources of fugitive benzene emissions in the by-product unit
were screened with a portable hydrocarbon detector to estimate the frequency
of leak occurrence.  Liquid and vapor benzene fugitive emission rates were
quantified by collecting and analyzing samples from leaking fittings.  Also,
liquid samples were obtained from process lines to provide data on the
proportion of benzene in process lines relative to the proportion of benzene
in emissions from fittings in those lines.

     The following sections present a summary of results, a description of the
process configuration, the testing -methodology, and QA/QC procedures.  Example
calculations and a full listing of data and other supplemental information
are included in the appendices.

-------
                                   SECTION 2
                              SUMMARY OF RESULTS
     This section presents a summary of the fugitive emission data gathered
at the Republic Steel plant in Gadsden.  All data are presented in the form
of original data sheets in Appendix B.

     The plant screening results are presented in Table 2-1.  This table
presents the distribution of OVA readings for each source type.

     The results of the baggable sampling are presented in Table 2-2.  The
mass emission rates are presented in pounds per day for each source in terms of
both benzene and nonmethane hydrocarbons.  Mass emission rates are also pre-
sented in terms of vapor phase and liquid phase emission rate.  Each source was
rescreened immediately before and after bagging.  The average of these two
values is also presented in Table 2-2 for both the OVA and the TLV.

     A comparison of the benzene concentration in vapor-phase and total emissions
with the benzene concentrations in the liquid lines is presented in Table
2-3.  The benzene concentration in the vapor-phase leak and the total leak
(vapor plus liquid) is expressed as the ratio of the benzene emission rate
to the non-methane hydrocarbon emission rate, since bag samples are diluted
with air.

-------
             TABLE 2-1.   OVA SCREENING VALUE DISTRIBUTION:   REPUBLIC STEEL GADSDEN PLANT
OVA
SCREENING
VALUE (ppmv)
0 to 199
200 to 9,000
>_ 10,000
Total Sources Screened
FLANGES

#a
47
0
0
47

%b
100.0
0.0
0.0
100.0
THREADED
FITTINGS

#
42
0
0
42

%
100.0
0.0
0.0
100.0
VALVES

//
44
4
5
53

%
83.0
7.5
9.4
100.0
PUMPS
SEALS

'#
0
0
4
4

%
0.0
0.0
100.0
100.0
EXHAUSTERS

#
4
2
0
6

%
66.
33.
0.
100.


7
3
0
0
a)  # - number of sources in each category
b)  % - percent of total sources screened

-------
          TABLE  2-2.  SUMMARY  OF BENZENE AND  NON-METHANE HYDROCARBON LEAK RATES  (LB/HR)
                       FROM SAMPLED SOURCES:   REPUBLIC STEEL  GADSDEN PLANT



Block Valves







Control Valves
Pumps



Exhausters


Sampling
Date
12/10/80
12/11/80





12/12/80
12/10/80
12/10/80

12/11/80

12/12/80


Source
ID
23
121
122
123
124
125
129
73
32
21-SC
119-S
28-S
120-S
2
4
Mean OVA
Rescreenlng
Value3
0
10000
57501
1800
65001
55000
40000
1250
75000
75001
67500
100001
57000
2000
500
Mean TLV




Rescreenlng Benzene Leak Rates
Value Vapor
b
2590
8901
40
6301
800
4300
700
9351
9000
8700
10001
8401
2450
800

0.000260
0.044714
0.001576
0.131233
0.001347
0.006814
0.000941
0.435302
0.289490
0.446587
0.121617
0.626817
0.001901
0.000755
Li
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
1.
0.
2.
0.
0.
quid
299810
000000
040316
000000
000000
000000
000000
000000
000000
000000
212200
478370
538640
000000
000000
Total

0.000260
0.085030
0.001576
0.131233
0.001347
0.006814
0.000941
0.435302
0.289490
1.658787
0.599987
3.165457
0.001901
0.000755


Nonmethane-HC Leak
Vapor

0.000915
0.045277
0.002448
0.113854
0.001460
0.006442
0.001490
0.476986
0.370162
0.485804
0.130749
0.733095
0.011467
0.005489
Liquid
0.437040
0.000000
0.055379
0.000000
0.000000
0.000000
0.000000
0.000000
0.000000
0.000000
1.582500
0.722610
3.314150
0.000000
0.000000

Rates
Total
.
0.000915
0.100656
0.002448
0.113854
0.001460
0.006442
0.001490
0.476986
0.370162
2.068304
0.853359
4.047245
0.011467
0.005489
a)  Average of before and after sampling screening values (given in Appendix B-2).
b)  This symbol indicates that no data was  taken in that category.
c)  S denotes a single seal pump.

-------
l/i
                      TABLE 2-3.   COMPARISON  OF BENZENE CONTENT IN  EMISSIONS AND  IN LIQUID LINES:
                                    REPUBLIC STEEL GADSDEN PLANT

Line
BTX Light
Oil

BTX Light
Oil






Footnotes;
a)
b)
c)
d)
Temp Press Wt % Benzene
(°F) (psig) in Line
71 35 71.5


50 20 71.5







! /

Weight percent benzene in the vapor =| .. ' 	 ~
\ /
Weight percent benzene in the total leak- 1 — — - — i-
S denotes a pump with a single seal «
HA denotes high ambient: ambient benzene content
Source Wt
ID in
21SC
28S
32
119S
120S
121
122
123
124
125
129
\
emissions of benzene 1
emissions of NMHC /
% Benzene3
Vapor Leak
79
93
92
93
87
29,HAd
99
64
115 e
92
106 e

100
b
Wt % Benzene
in Total Leak
79
70
92
80
78
29
85
64
115
92
106


' \
mass emissions of benzene|X 100
mass emissions of NMHC

at least 40 percent of
;
/
sample benzene



                          content
                          Analysis for benzene and NMHC were performed on different instruments; probably almost
                          all of the NMHC in this sample is benzene

-------
                                  SECTION 3
                             PROCESS DESCRIPTION
     The Republic Steel plant at Gadsden, Alabama operates with a wash oil
absorption system to recover light oil from the coke oven gas.  The crude
light oil product is sent outside of the plant for refining.

     During the testing period, the coke ovens were producing 1470 tons per
day of coke and 22.5 MMSCFD of coke oven gas.  The light oil recovery unit
was recovering 5,630 gallons per day of crude BTX light oil.

     A simplified flow diagram for the plant is shown in Figure 3-1.  The
benzolized wash oil from the scrubber is stripped with steam to separate the
light oil from the wash oil.  The light oil vapors then go to a rectifier.
The rectifier splits the light oil into two fractions, an overhead and a
bottoms fraction.  The overhead fraction includes essentially all of the
benzene, and is referred to as BTX light oil.  These BTX vapors are condensed
and the water taken out in the light oil separator.

     Fugitive emissions testing was to be performed in all areas of the
plant with at least 4 weight percent or more benzene.  This included the
stripper overhead, the BTX product, and the BTX storage and loading areas.
Also screened were the exhausters, which are upstream from light oil recovery
on the coke oven gas line, and are not shown in Figure 3-1.  The benzolized
wash oil and the rectifier bottoms (secondary oil) contain less than 4 weight
percent benzene and were not screened.

-------
               VAPOR LIGHT OIL
                AND STEAM
                                                  BTX + STEAM
DEBENZOLIZED
 WASH OIL
       COKE
       OVEN
       GAS
        Numbers  following the letters VA and PU are source  ID numbers
        for valves  and pumps, respectively,  from which fugitive emissions
        were detected.

        Numbers  in  parentheses are the weight percent benzene in that
        lime.
          Figure 3-1.   Light Oil Recovery Unit, Republic  Steel.

-------
                                  SECTION 4
                                 METHODOLOGY
     The fugitive emissions testing at the Republic Steel Gadsden plant
included both "screening" and "bagging" operations.  Screening is a generic
term covering any quick portable method of detecting fugitive emissions.  Bag-
ging refers to a quantitative emission measurement achieved by enclosing the
source in a Mylar® shroud and analyzing an equilibrium flow of air through
the enclosure.

4.1  SCREENING PROCEDURES

     Screening was done according to the procedures specified in EPA's proposed
Method 21, a copy of which may be found in Appendix A-2.  The instrument used
in performing this screening was the Century Systems Organic Vapor Analyzer
(OVA) Model 108.  Method 21 requires the results of the screening to be
recorded  Oas specified in the applicable regulation) only if the leak
definition Is met or exceeded.  Since this effort was more oriented to standards
development than to regulatory monitoring, the exact screening value was record-
ed for all sources.

     The screening methods were used to survey every accessible valve and pump,
and a portion of the flanges, on lines handling at least 4 weight percent
benzene.  Only one-third of the flanges were screened because of their large
population.  Exhausters were also screened, although they are not in the light
oil recovery section of the plant and the coke oven gas they handle contains
less than 4 weight percent benzene.  Exhausters were included because they
can potentially have high emissions.

-------
     The survey was conducted on a line-by-line basis with plant flow diagrams
 to ensure that no sources were missed and to group sources subject to similar
 process conditions.  Plant personnel corroborated the identification of process
 lines and supplied data that was not otherwise immediately available, such as
 the composition and phase of the material in the line.

     All leaking valves, pump seals, and exhauster seals were tagged with their
 respective ID numbers and were subsequently bagged.

 4.2  SAMPLING PROCEDURES

     Bagging procedures were carried out according to methods developed in
 previous petroleum refinery testing.  Before and after a source was sampled, it
 was again screened.  This time, however, a J.W. Bacharach "TLV Sniffer" (TLV)
 was used in addition to the OVA.  The OVA uses a flame ionization detector and
 has a quick response time that makes it ideal for the initial screening.  The
 TLV uses a catalytic oxidation detector and has a slower response than the
 OVA.

     The leaking area of the source was completely enclosed in a shroud of
 Mylar® plastic to contain any emissions.  Mylar® is well suited to this func-
 tion, because it does not absorb significant amounts of hydrocarbons and has
 a high melting point (250°C).  The enclosures were kept as small as possible,
 generally less than one cubic foot in volume except for enclosures of exhauster
 seals.  A small enclosure provided a more effective seal, minimized the time
 required to make the enclosure and reach steady-state conditions, and minimized
 the condensation of heavy hydrocarbons within the enclosure.

     The enclosure was connected to the sampling train shown in Figure 4-1.
The sampling train included a cold trap, a dry gas meter, and a vacuum pump.
The vacuum pump induced a flow of air, plus any fugitive emissions contained

-------
MAGNEHELIC

x-
a
V
V
TEt
1
1
-~X
n\ ._
L'l 1
^J
r
IT
/



—

'



[— r—

If
dT

\
1 —
-^





!2
t
/-I -
f
LEAKING

THIS LINE SHOULD
BE AS SHORT
,A t! PD Q <5in 1 P
/ 1\ \3 \ \J O O 1 U l_ L
V,
\
-1
COLD TRAP
(ICE DATH)

TRAP



(
i
— il_|f7




i—w 1
a



DRY OAS
VALVE












METER









Hg MANOMETER
CONTROL
^ VALVE ^—v 	 > — «-
i-^-^l 1 Fi~~~ ' O I
n^j1 >-<
P
[
FILTER VACUUM PUMP
^Q=®F=K SAMPLE DAQ
                                                SMALL  \\	/
                                              DIAPHRAGM \
                                                PUMP      TWO WAY VALVE
Figure 4-1.  Sampling train for baggable source of hydrocarbon emissions.

-------
within  the  enclosure, through the sampling train.  A magnehelic connected  to
the  enclosure with a short piece of latex tubing was used  to  ensure  that a
slight, but measurable, vacuum was maintained within the enclosure.  A slight
vacuum  prevented fugitive emissions from leaking out of the enclosure.  To
obtain  an adequate vacuum on the two leaking exhausters, it was necessary  to
connect each enclosure to two sampling trains.

      The cold trap was used to condense water and heavy organics  that  might
otherwise condense downstream in lines and equipment.  This trap  consisted
of a 500 ml flask in an ice bath.  No condensate was observed at  the Gadsden
plant;  however, if an organic condensate were collected, it would be measured,
analyzed, and included in calculating the total leak rate.

      Downstream from the cold trap, a dry gas meter measured  the  volume of
gas  that passed through the sampling train.  By measuring  the volume of gas
during  a known period of time, it was possible to calculate the dry  gas
flow rate.  The gas flow rate could be varied, and the maximum flow  rate
achievable  was about 2.5 cubic feet per minute.  The temperature  and pressure
of the  gas  were measured to allow a conversion to standard conditions.

      When sufficient time had passed to allow the system to reach steady-state
(generally, 4 minutes were more than adequate for an enclosure of 1  cubic  foot),
a Tedlar® sampling bag was filled from the discharge of the small Teflon®-lined
diaphragm pump.  A second Tedlar® bag was filled with a sample of ambient  air
near  the enclosure.  The two samples were then taken to the mobile lab on  the
plant grounds for analysis.

     Liquid leak rates were estimated by capturing the liquid in  a watchglass
and measuring the volume collected over a known period of  time.   Samples of
each, liquid leak and of the- liquids from process lines were taken back to  the
laboratory for benzene analysis.  Sample bottles were filled  to the  brim to
minimize any vapor overhead space that would allow the benzene in the  liquid
sample  to become dispersed between 2 phases.
                                      11

-------
4.3  ANALYTICAL TECHNIQUES

     To quantify the VOC emissions from the bagged sources, the concentration
of total hydrocarbon and also that of benzene were determined using gas chroma-
tographic procedures.  Primary analysis of fugitive volatile organic compounds
(VOC) was performed on a Byron 301C Total Hydrocarbon Analyzer (THC).   The
THC has an upper detection limit of 20,000 ppmv.  Dilutions of more concen-
trated samples were made with a 1.5 liter gas-tight syringe.

     Methane calibrations were carried out daily on the THC with an 8000 ppmv
methane/air standard.  Nonmethane hydrocarbon calibrations were also carried
out daily on the THC with a 713 ppmw NBS propane standard.

     Analyses for benzene were performed on a Hewlett Packard 5730A Dual FID
Gas Chromatograph.  Dual gas samples were introduced simultaneously onto sepa-
rate columns with a Valco 10 port Hastalloy C multiport valve installed immedi-
ately forward of the GC syringe injection ports.  Peak integrations were com-
piled on two Hewlett Packard 3380A electronic integrators.  Liquid samples
were analyzed by normal syringe injection techniques using benzene as an ex-
ternal standard.

     The columns and conditions used for the benzene analyses are listed
below:

          1/8" OD, 2 mm ID, 15 feet, 5% SP-2100/1.75% Benton 34
          on 100/120 mesh Supelcoport.
          1/8" OD, 2 mm ID, 15 feet, 10% TCEP on 100/120 mesh
          Chromosorb P acid washed.
          N2 carrier at 30 ml/min.
          Isothermal at 110°C.

The instrument was calibrated daily with a 5571 ppmw benzene in air standard.
Single analyses were done simultaneously on the two different columns after
calibration.

                                       12

-------
                                  SECTION 5
                      QUALITY CONTROL/QUALITY ASSURANCE


5.1  QUALITY CONTROL FOR SCREENING PROCEDURES

     Screening at the Gadsden plant was done with a single Century Systems
Organic Vapor Analyzer (OVA) Model 108 and one J.W. Bacharach Instrument
Company "TLV Sniffer."  The corresponding instrument identification numbers
are given below:

           Device Type                        Assigned ID Number
               OVA                                     3
               TLV                                     4

     The OVA and TLV instruments were calibrated in the morning each day before
they were used.  Standards of 90 ppmv and 1990 ppmv hexane in air were used to
obtain a two point calibration on the TLV; 7990 ppmv methane in air was used
to calibrate the OVA.  Before a recalibration was made each day, the values
obtained from the instrument were recorded.  This served two purposes:

     •    a check for instrument damage or malfunction, and
          a rough- check of the stability of the daily calibration.

     In addition to the high- (.and low for TLV) standard calibrations, a
dilution probe was occasionally attached to the instrument and another read-
ing was taken.  The probe was s-et at 10:1 dilution of the high standard con-
centration.  The calibration data is summarized in Table 5-1.
                                       13

-------
TABLE 5-1.  CALIBRATION CHECKING OF OVA AND TLV
Date
12/08/80
12/09/80
12/10/80

12/11/80
12/12/80
Footnotes:
a) OVA
b) OVA
c) TLV
d) TLV
e) The
OVA 3 t TLV 4 d
High Standard, ppmv Oil Probe, ppmv Low Standard.ppmv"" High Standard, ppmv"
3700
650e 3000
7500 1100 1800
\
>10,000 700 500 2000
>10,000 2000

calibration standard contained 7990 ppmv methane in air
reading with dilution probe should be 800 ppmv
low calibration standard contained 90 ppmv hexane in air
high calibration standard contained 1990 ppmv hexane in air
low valve was caused by an' instrument malfunction that "was -immediately corrected.

-------
     The calibration checking results do indicate some significant drift.  It
should be noted, however, that these readings are taken in the morning before
calibration and not at the close of the screening day.  It is likely that most
of the calibration drift occurs due to the overnight shutdown and recharge
rather than during the days screening.  The phenomenon of calibration drift
over a shutdown and re-start has been observed in other studies.  The low OVA
calibration value observed on December 9 was caused by an instrument malfunc-
tion that was immediately repaired.

5.2  QUALITY CONTROL FOR ANALYTICAL AND SAMPLING PROCEDURES

     Quality control procedures were implemented to insure accurate, consistent,
and unbiased analytical and sampling techniques during the project.  The
procedures discussed in this section include:

     •    blind standards
     •    accuracy checks

5.2.1  BLIND STANDARDS

     Standard materials were prepared and submitted to the analyst without
divulging the concentration of benzene or hexane present in order to evalute
the quality of data generated by the Byron 301C Total Hydrocarbon Analyzer
(THC) and the HP5703A Dual FID Gas Chromatograph.  A 262.7 ppm hexane standard
and a 1075.9 ppm benzene standard were implemented to demonstrate the precision
and accuracy of the analysis of bag samples by the Byron THC and the HP Gas
Chromatograph,  respectively.  Table 5-2 lists the data from the blind standard
analyses.  The difference between the prepared and measured concentration is
shown as the percent difference.  The percent difference is calculated as follows;

     %  Diff=(Prepared-Measured Concentration)X 100/Prepared Concentration.
                                       15

-------
                  TABLE 5-2.  BLIND STANDARDS DATA LISTING
                               Prepared   Measured   Diff.    Percent
Instr.     Date     Gas Type    (ppmw)      (ppmw)   (ppmw)      Diff
THC
HP
12/09/80
12/10/80
Hexane
Benzene
262.7
1075.9
247.9
1042.3
14.8
33.6
5.63
3.12
     In addition to the blind standard materials analysis, a sample of light
oil product was analyzed by GC/MS to confirm that the amounts of benzene found
by GC were only benzene and were not any coeluting compounds.  Analysis of this
sample and a sample of pure benzene, as depicted graphically in Figures 5-1
through 5-3, demonstrates.that there were no other compounds present with the
same retention time as benzene.

5.2.2  ACCURACY CHECKS

     Accuracy checks were used to evaluate the overall accuracy of the sampling
and analysis techniques.  It basically involves inducing a known flow rate of
a concentrated calibration gas into the sampling system and taking a bag sample
of the diluted calibration gas at the exit of the system.  Analysis of the bag
sample by THC or GC provides data to calculate the measured leak rate.  The
induced leak rate is calculated from the flow rate and concentration of the
induced standard gas.

     Table 5-3 lists the data from two accuracy checks.  The measured leak
rate, induced leak rate, and the percent recovery are shown.  The percent
recovery is calculated as follows:

             r,          Measured Leak Rate   - -._<,.
     Percent Recovery =    ,	—-—.  B    X 100%
                    J    Induced Leak Rate
                                      16

-------
FRII 17437 SPECTRUM 56 RETENTION TIME 3.3
U.K&ST 4« 78.0.100.9 77.0, 33.9 51.0, 31.8 53.0. 20.6
LAST 4! 77.0, 33.9 78.9,100.0 79.0, 6.8 80.1, .3
PAGE 1 V • 1.00
100
80
60
40
20
0
100
80
60
40.
20.
0.





i 	 ,,,], 	 aj-1





1
20 49 69 89 109 130 140 169




' 1S0 ' 208 ' 880 ' 340 ' 280 ' 288 ' 38(9 ' Q^'tJ
Figure 5-1.  Mass Spectrum of Pure Benzene on
             SP-2100/Bentone Column
                        17

-------
FRh 17445 SPECTRUM 81 RETENTION TIME 4.7
LARGST 4i 78.9,199.9 76.9. SS.6 58.9, 16.8 59.9, 14.5
LAST 41 76.9, 4.9 76.9, 3S.6 78.9,199.9 79.9, 6.7 '
PAGE 1 V • 1.90
L00
3d
60
40
0
199
80
69
40
20.
0



, , „ I , ,li



1
29 44 64 80 190 129 149 169




130 200 220 240 2fi0 280 309 33Q
Figure 5-2.  Mass Spectrum of Light Oil Product
             on SP-2100/Bentone
                       18

-------
 UORK AREA SPHCTPUn   FRN 17507
         :     78.0,100.0     76.9, E8.9
      4i        73.9,  7.a     78.9, 26.9
 +• 120 -114 -1
          PAC£ 1  Y -  1.00
54.0, 23.5      51.0, 31.2
73.0,10O.d      79.0,  7.2
 38


 60


 4«


 20


 0
               •p*" '" 1"
                   "40
              T1" ""|"»
                 140
80
40
 0
                        J     I
             Figure 5-3.  Mass Spectrum of Light Oil Product
                          on TCEP
                                   19

-------
                 TABLE 5-3.  ACCURACY CHECKS DATA LISTING
                              Measured         Induced
               Standard       Leak Rate       Leak Rate       Percent
  Date	Type	(lbs/hr)	(Ibs/hr)	Recovery

12/09/80        Benzene       0.0008817       0.0007554        116.7

12/09/80        Hexane        0.0008251       0.0008232        100.2
                                    20

-------
         REPUBLIC STEEL

          GADSDEN PLANT


          APPENDIX A


    CALCULATIONS AND METHODS
A-l  Sample Emission Calculations
A-2  EPA Proposed Method 21
               21

-------
          REPUBLIC STEEL
           GADSDEN PLANT
A-l  Sample Emission Calculations
                22

-------
                                APPENDIX A-l

 EMISSION CALCULATIONS

     The emission rates can be calculated from the physical measurements
 recorded during the operation of the sampling train and with  the  anlyses
 of  the hydrocarbon content of the air passing through  the  sampling  train.
 The basic  equation is:
        ki DF(P-AP)M(C -C )
     T                1  A                                       / A  1 \
where     L = Hydrocarbon vapor emission rate, Ib/hr
                     _6
         k.! = 2.75x10    (°R-min-mole/SCF-in.Hg-hr-ppmw)
          D = Dry gas meter correction factor  (dimensionless)
          F = Flow rate, cubic feet per minute
          P = Ambient atmospheric pressure, in. Hg
         AP = Pressure differential between ambient pressure
              and pressure at dry gas meter, in. Hg
          M = Average molecular weight of gas  (essentially
              air) passing through dry gas meter, Ib/lb.mole
         Q
          T = Total hydrocarbon concentration  in air  passing
              through the dry gas meter, ppmw
         Q
          A = Total hydrocarbon concentration  in air  near the
              sampled leak source, ppmw
          T = Temperature of gas (air) stream  at the  dry gas
              meter, °F.
The constant k^ is a product of several conversion -constants:
         ,    (.520°R) x (.60 min/hr).    	
            —
             (379 ^f ) x (29.92 in. Hg) x  (lQ6ppmw)
                  mole
                                     23

-------
         ki = 2.75 x 10~ (°R-min-mole/SCF-in.Hg-hr-ppmw)
As an example calculation, assume a total hydrocarbon concentration of 19,000
ppmw was measured in the gas stream from a tent around a leaking source in an
ethylene unit.  The hydrocarbon would be assumed to be hexane (MW-86).  The
following values were recorded during the sampling:
          F = 1.5 CFM
          P = 29.9 in. Hg
         AP = 2.0 in. Hg (at the dry gas meter)
          T = 19,000 ppmw
          A = 20 ppmw
          T = 75°F

and       D = 0.95

                     10s
Then      M = 19.000 + 10b - 19,000 = 29'37
                86         29

The vapor emission rate L is then calculated from Equation (A-l)
              (2.75 x 10~6)(0.95)(1.5)(29.9 - 2.0)(29.37X19,000 - 20)
                                  460 + 75
          L = 0.114 Ib/hr.

     The vapor emission rate of benzene is estimated from the hydrocarbon
emission rate and the concentration data for benzene and non-methane hydro-
carbons.  The equation used is:
                 (CB " CAB)                                  (A-2)

where     B = Benzene vapor emission rate, Ib/hr
         Cij = Benzene concentration in air passing through
          B
              the dry gas meter, ppmw
        C.  = Benzene concentration in air near the sampled
              leak source, ppmw.
                                     24

-------
For example, using the previous example with the data:
     C  = 15,500 ppmw
     AB
the benzene vapor emission rate is calculated:
      B = 0.114 (15,500 - 10)
                (19,000 - 20)
      B = 0.093 Ib/hr.

     The emission rates for liquid leaks are calculated by the equation:
     TLLR =7.93   -^—                                      (A-3)
                    t
where TLLR = Total liquid leak rate, Ib/hr
      7.93 = Conversion factor from g/.sec to Ib/hr
         V = Volume of liquid collected, cc
         t = Time of collection, sec
         P = Density of sample, g/cc.

For example, 4.0 cc of liquid from a leaking source were captured in 60
seconds, and the liquid was found to have a density of 0.75 g/cc, then:
     TLLR = (7.93)(0.75)(4.0)/(60)
     TLLR =  0.40 Ib/hr.

     The liquid benzene leak rate is:
     BLLR = TLLR [Benz.J                                      (A-4)
               100
where BLLR = Benzene liquid leak rate
     [BenzJ= Benzene concentration in liquid, weight percent
For example, if the liquid leak described above was found to have 79 wt per-
cent benzene then:
     BLLR = (0.40)(79)/(100)
     BLLR =  0.31 Ib/hr.
                                     25

-------
      REPUBLIC STEEL
       GADSDEN PLANT
A-2  EPA Proposed Method 21
              26

-------
     PROPOSED METHOD.21.   DETERMINATION.OF.VOLATILE ORGANIC COMPOUND LEAKS
1.    Applicability and Principle
     1.1   Applicability.   This method applies to the determination of
volatile  organic compound (VOC) leaks from organic process equipment.
These sources include, but are not limited to, valves,  flanges and other
connections, pumps and compressors,  pressure relief devices,  process
drains, open-ended valves, pump and  compressor seal  system degassing
vents, accumulator vessel vents, and access door seals.
     1.2  Principle.  A portable instrument is used to detect VOC leaks
from individual sources.   The instrument detector is not specified, but
it must meet the specifications and  performance criteria contained in
paragraph 2.1.
2.   Apparatus
     2.1   Monitoring Instrument.  The monitoring instrument shall be as
follows:
     2.1.1  Specifications.
     a.  The VOC instrument detector shall respond to the organic
compounds being processed.  Detectors which may meet this requirement
include,  but are not limited to, catalytic oxidation, flame ionization,
infrared  absorption, and photoionization.
                               27

-------
     b.  The instrument shall be intrinsically safe for operation in
explosive atmospheres as defined by the applicable U.S.A. Standards
(e.g., National Electrical Code by the National Fire Prevention Association),
     c.  The instrument shall be able to measure the leak definition
concentration specified in the regulation.
     d.  The instrument shall be equipped with a pump so that a
continuous sample is provided to the detector.  The nominal sample flow
rate shall be 1-3 liters per minute.
     e.  The scale of the instrument meter shall be readable to
±5 percent of the specified leak definition concentration.
     2.1.2  Performance Criteria.  The instrument must meet the
following performance criteria.  The definitions and evaluation
procedures for each parameter are given in Section 4.
     2.1.2.1  The instrument response time must be 30 seconds or less.
The  response time must be determined for the  instrument system
configuration  to be used  during testing, including dilution equipment.
The  use  of a system with  a shorter response time than that specified
will reduce the time required for field component surveys.
     2.1.2.2   Calibration Precision:  The calibration precision must be
less than or equal to 10  percent of the calibration gas value.
     2.1.2.3   Quality Assurance.  The instrument shall be  subjected to
response time  and calibration precision tests  prior to being placed in
service.  The  calibration precision test shall be repeated every
6 months  thereafter.  If  any modification or  replacement of the
                                 28

-------
instrument detector is required, the instrument shall be retested and a
new 6 month quality assurance test schedule will apply.  The response
time test shall be repeated if any modifications to the sample pumping
system or flow configuration is made that would change the response
time.
     2.3  Calibration Gases.  The monitoring instrument is calibrated in
terms of parts per million by volume (ppmv) of the compound specified in
the applicable regulation.  The calibration gases required for
monitoring and instrument performance evaluation are a zero gas (air,
3 ppmv VOC) and a calibration gas in air mixture approximately equal to
the  leak definition specified in the regulation.  If cylinder
calibration gas mixtures are used, they must be analyzed and certified
by the manufacturer to be within ±2 percent accuracy.  Calibration gases
may be prepared by the user according to any accepted gaseous standards
preparation procedure that will yield a mixture accurate to within
±2 percent.  Alternative calibration gas species may be used .in place of
the calibration compound if a relative response factor for each
instrument is determined so that calibrations with the alternative
species may be expressed as calibration compound equivalents on the
meter readout.
3.   Procedures
     3.1  Calibration.  Assemble and start up the VOC analyzer and
recorder according to the manufacturer's instructions.  After the
appropriate warmup period and zero or internal calibration procedure,
introduce the calibration gas into the instrument sample probe.   Adjust
the instrument meter readout to correspond to the calibration gas value.
                                 29

-------
If a dilution apparatus  is used, calibration must include the instrument
and dilution apparatus assembly.  The nominal dilution factor may be
used to establish a scale factor for converting to an undiluted basis.
For example, if a nominal 10:1 dilution apparatus is used, the meter
reading for a 10,000 ppm calibration would be set at 1,000.  During
'field  surveys, the scale factor of  10 would be used to convert
measurements to an undiluted  basis.
     3.2   Individual Source Surveys.
     3.2.1  Case  I - Leak Definition Based on Concentration Value.
Place  the probe inlet  at the  surface of the component interface where
leakage could occur.   Move the probe along the interface periphery while
observing the instrument readout.   If an  increased meter reading is
observed, slowly  probe the interface where leakage is indicated until
the maximum meter reading is  obtained.  Leave the probe inlet at this
maximum reading location for  approximately two times the instrument
response  time.  If the maximum observed meter reading is greater than
the  leak  definition  in the applicable regulation, record and report the
results as specified  in  the  regulation  reporting requirements.  Examples
of the application of  this general  technique to specific equipment types
are:
     a.    Valves—The  most common  source  of  leaks from valves is at the
seal between  the  stem  and housing.   Place the probe at the interface
where  the stem exits  the packing gland  and sample the stem
circumference.  Also,  place  the  probe at  the  interface of  the packing
gland  take-up flange  seat and sample  the  periphery.   In addition,  survey
                                 30

-------
valve housings of multipart assembly at the surface of all interfaces
where leaks can occur.
     b.  Flanges and Other Connections—For welded flanges, place the
probe at the outer edge of the flange-gasket interface and sample around
the "circumference of the flange.  Sample other types of nonpermanent
joints (such as threaded connections) with a similar traverse.
     c.  Pumps and Compressors—Conduct a circumferential traverse at
the outer surface of the pump or compressor shaft and seal interface.
If  the source is a rotating shaft, position the probe inlet within one
centimeter of the shaft-seal interface for the survey.  If the housing
configuration prevents a complete traverse of the shaft periphery,
sample all accessible portions.  Sample all other joints on the pump or
compressor housing where leakage can occur.
     d.  Pressure Relief Devices—The configuration of most pressure
relief devices prevents sampling at the sealing seat interface.  For
those devices equipped with an enclosed extension, or horn, place the
probe inlet at approximately the center of the exhaust area to the
atmosphere for sampling.
     e.  Process Drains—For open drains, place the probe inlet at
approximately the center of the area open to the atmosphere for
sampling.  For covered drains, place the probe at the surface of the
cover interface and conduct a peripheral traverse.
     f.  Open-Ended Lines or Valves—Place the probe inlet at
approximately the center of the opening to the atmosphere for sampling.
                                31

-------
     g.  Seal System Degassing Vents and Accumulator Vents—Place the
probe inlet at approximately the center of the opening to the atmosphere
for sampling.
     h.  Access Door Seals—Place the probe inlet at the surface of the
door seal interface and conduct a peripheral traverse.
     3.2.2  Case II-Leak Definition Based on "No Detectable Emission".
     a.  Determine the local background concentration around the source
by moving the probe inlet randomly upwind and downwind at distance of
one to two meters from the source.  If an interference exists with this
determination due to a nearby emission or leak, the local background
concentration may be determined at distances closer to the source, but
in no  case shall the distance be less than 25 centimeters.  Note the
background concentration and then move the probe inlet to the surface of
the source and conduct a survey as described in 3.2.1.   If a concentration
increase greater than 2 percent of the concentration-based leak definition
is obtained, record and report the results as specified  by the regulation.
     b.  For those cases where the regulation requires a specific device
installation, or that specified vents be ducted or piped to a control
device,  the  existence of these conditions shall be visually confirmed.
When the regulation also requires that no detectable emissions exist,
visual observations and sampling surveys are required.   Examples of this
technique are:
     i.  Pump or Compressor Seals—If applicable, determine the type
of shaft seal.  Perform a survey of the local area ambient VOC
                                32

-------
concentration and determine if detectable emissions exist as described
in 3.2.2.a.
     ii.  Seal  system degassing vents, accumulator vessel vents,
pressure relief devices—If applicable,, observe whether or not the
applicable ducting or piping exists.  Also, determine if any sources
exist in the ducting or piping where emissions could occur prior to the
control device.  If the required ducting or piping exists and there are
no sources of where the emissions could be vented to the atmosphere
prior to the control device, then it is presumed that no detectable
emissions are present.
4.   Instrument Performance Evaluation Procedures
     4.1  Definitions.
     4.1.1  Calibration Precision.  The difference between the average
VOC  concentration indicated by the meter readout for consecutive
repetitions and the known concentration of a test gas mixture.
     4.1.2  Response Time.  The time interval from a step change in VOC
concentration at the input of the sampling system to the time at which
90 percent of the corresponding final value is reached as displayed on
the  instrument readout meter.
     4.2  Evaluation Procedures.  At the beginning of the instrument
performance evaluation test, assemble and  start up the instrument
according to the manufacturer's instructions for recommended warmup
period  and preliminary adjustments.  If a  dilution apparatus is used
during  field surveys, the evaluation procedure must be performed on the
instrument-dilution system combination.
                               33

-------
     4.2.1  Calibration Precision Test.  Make a total of nine
measurements by alternately using zero gas and the specified calibration
gas.  Record the meter readings (example data sheet shwon in Figure 21-
1).
    •4.2.2  Response Time Test Procedure.  Introduce zero gas into the
instrument sample probe.  When the meter reading has stabilized, switch
quickly to the specified calibration gas.  Measure the time from
concentration switching to 95 percent of final stable reading.  Perform
this test sequence  three times and record the results (example data
sheet given in Figure 21-2).
     4.3  Calculations.  All results are expressed as mean values,
calculated by:
                             *'
 Where:
      x.   =  Value  of  the  measurements.
       2  =  Sum of the  individual  values.
      —   =  Mean value.
      A
      n   =  Number of data points.
                                34

-------
           REPBULIC STEEL

            GADSDEN PLANT


             APPENDIX B


        ORIGINAL DATA SHEETS
B-l  Screening Data
B-2  Screening Sheets for Sample Data
B-3  Sample Data
B-4  Analysis Data
B-5  OVA and TLV Calibration Data
B-6  Dry Gas Meter Calibration Data
B-7  Accuracy Check Data
                 35

-------
  REPUBLIC STEEL
   GADSDEN PLANT
B-l  Screening Data
       36

-------
TABLE B-l.l.  SOURCE TYPE IDENTIFICATION CODES
Source Type
Flange
Process Drain
Open-End Line
Agitator Seal
Relief Valve
Screwed Fitting
Valves
Block valve - gate type
Block valve - globe type
Block valve - plug type
Block valve - ball type
Block valve - butterfly type
Block valve - other types
Control valve - gate type
Control valve - globe type
Control valve - plug type
Control valve - ball type
Control valve - butterfly type
Control valve - other types
On-Line Pump Seals*
Single, mechanical, emission point at seal
Single, mechanical, emission point at vent
Single, mechanical, other emission point
Double, mechanical, emission point at seal
Double, mechanical, emission point at vent
Double, mechanical, other emission point
Source Type
Code
1
2
3
4
5
6

10
11
12
13
14
15
20
21
22
23
24
25

30
31
32
33
34
35
                                               Continued .
                       37

-------
                         TABLE B-l.l.  CONTINUED
              Source Type
Source Type
   Code
     Single,  packed,  emission point  at  seal
     Single,  packed,  emission point  at  vent
     Single,  packed,  other emission  point
     Sealless pumps
Off-Line Pump Seals
     Single,  mechanical, emission point at seal
     Single,  mechanical, emission point at vent
     Single,  mechanical, other emission point
     Double,  mechanical, emission point at seal
     Double,  mechanical, emission point at vent
     Double,  mechanical, other emission point
     Single,  packed,  emission point  at seal
     Single,  packed,  emission point  at vent
     Single,  packed,  other emission point
     Sealless pumps
On-Line Compressor Seals
     Single,  mechanical, emission point at seal
     Single,  mechanical, emission point at vent
     Single,  mechanical, other emission point
     Double,  mechanical, emission point at seal
     Double,  mechanical, emission point at vent
     Double,  mechanical, other emission point
     Single,  packed,  emission point at seal
     Single,  packed,  emission point at vent
     Single,  packed,  other emission point
     Sealless compressors
      36
      37
      38
      39

      40
      41
      42
      43
      44
      45
      46
      47
      48
      49

      50
      51
      52
      53
      54
      55
      56
      57
      58
      59
                                                           Continued
                                    38

-------
                         TABLE B-l.l.  CONTINUED
             -      ™                                        Source Type
             Source Type                                         _  ,  JY
                     3*                                          Code

Off-Line Compressor Seals
     Single, mechanical, emission point at seal                  60
     Single, mechanical, emission point at vent                  61
     Single, mechanical, other emission point                    62
     Double, mechanical, emission point at seal                  63
     Double, mechanical, emission point at vent                  64
     Double, mechanical, other emission point                    65
     Single, packed, emission point at seal                      66
     Single, packed, emission point at vent                      67
     Single, packed, other emission point                        68
     Sealless compressors                                        69
Exhausters
     Suction side                                                70
     High pressure side                                          71

* 0 = outboard seal;  I = inboard seal
                                   39

-------
              TABLE B-1.2.  STREAM IDENTIFICATION CODES
Code                         Description of Stream (Columns 25-27)

  1           Coke oven gas
  2           BTX fraction of light oil; Unit 3 refers to this as
              Secondary Oil - a convention different from that used at
              Unit 2 where secondary oil is the non-BTX fraction of the
              light oil
  3           Steam and vaporized light oil
  4           Light oil - mostly BTX with some 2° oil
  5           Light oil (BTX and 2° oil)
                                         Service

  1           Gas
  2           Light liquid
  3           Heavy liquid

                                        Elevation

  1           Sources at ground level
  2           Sources at one level above ground level
  3           Sources at two levels above ground level
                                 40

-------
                                                                                                  UMIT
                                                  SCREENING DATA SHEET
Month
i


















\
•7
b-



















id
Q
3
0


















\
8


















/
^1
Screening
Team
O


















\
1


















/
vj Instrument 1
3


















'
01
So
3 M
0
8
















\
































'



















i
1

1
f
1
i
/,
.1
3
4
5
^
T
B
•<}
o
r
•"

v-

^
Afc
yb
/
.-,
7'

tr
c
•H QJ
C 3
01 ^H
01 id
Ul
13
'••'ii.


















''




































.
























2


















O
*5 c>
b

|r7
o
b
h
h

'o
in

IQ
0
\*>
P
P
P
P
to
o
Source
Type
"1

J
o
1 1
^
T\l
7\o
7\i
0\L
n


/r
6'
c9
/|o
o\c
A
1
£
/
f\0
n
n

r>
r>
[£'
^
^
£
A
to,
N -
Process
Unit








_"*.










2


















|V
m
a
-H

' t
-I








V
> <
Primary . '
Material
a
25



























1
t
1
1
/
^
2
4-2
' «'
2
-12

z


e
12

2
12


7
Z
|2
12-
o
o
28















'




Secondary
Material
9
29







1




















































u
c
0
o
32




















©
Line
Temperature
ep





















t
1
1


*'lfl
<^|6

i li
0
0

h

























\
z












/
8
01 g o>
c in -H
•H Ul Ul
t-} 01 Cli
ft





















1
I-ZIP


















Hp
2|b
* • 	

\










'"-


£ c
4J 3 0
. C 4-" -rt
V 0) n id JJ
• >S -H l-l t, J
5s^ E
^ V "
41 44





'














'I



















6 /




>
2













1
o
45
t —
-2


2.
/
! <5













i
•z.
— .1
S
\
"r
COMMENTS :

-------
                                   )\^ i-
                                              2-A
                       SCREENING DATA SHEET
                                                       ' "'
Screening
Team
                                     13
                                                       20
Proce
hj
to
j^
                                                                       Primary
                                                                       Material
                                                                     25
                                                                             28
                                                  Secondary
                                                   Material
                                                                                29
                                                                                       32
                                                               01
                                                               K
                                                               s
                                                             01 1)
                                                             C tn Ix
                                                             *r
                                                                                                         01
                                                                                                         tj
                                                                                                         0.
Ambient
Air
mperature
op
Xk
>-
                                                                                                                          45

                                            f J
fill
                                                                                   7  o
                            z
 f
                                  z.
                    Jo
JU
                                                       <\
                                                       0\l
                                                    10

                                 l/
                                            I00IDI0
IS3
                                                1
                               - k
                         ^L
                                                     0
                        1\f>
                               3
                     b
                                                       Oil
                               37
                                 I?
-T.I O
^ /
                                                    IP
1^
                                                       /p
                         \/
/
        COMMENTS :
                                                                             '' -n

-------
                                                                 SCREENING DATA SHEET
Month
fV-


















\



















10
Q
3
r>|£


















V


















r
yi
Screening
Team
')\t
0
o
0
0
0
0
0
0
0
0
0
0
0
0
<2x
tf
I








\
1
\
\
1
s
-t
o\ •;
(;i
0
j
3
4-»
C
0>
M
•H
Ul
5
7
3


















1
0)
u
8
141 1
— i — i — IT ' ' —
\4 1'2
\A 12
1414
14 1£
kit,
1417
\4\B
H?|9
|5|O
|S|/
1512

15 H
15 fcf

I5"l7
1 '51^?
|5|9
\&\V
c
•H 01
C 3
iu a
8s*
U)
13





















rO
h

x^
h
|0
|0
Irt
-|(O
k?
|T
\3
\d
\d
\o



^)
<2>
-,
\ /'})


a
^
01
o a>
3 ^
O H
Ul
20
/)|&
<)|fc>
/l<^
6>|4
0|4
/|o
/|o
•OJc.
ol^>
/I/
/I/
'I/

/I/
r>lr-
ill

0|0
0|(^
/I j
N)
ro
Process
Unit
i


















i


















I/
£ Service 1
<2.


















w
Primary
Material
Q
H
25
1?-



















U
§
o
28



















/
Secondary
Material
a
H
29




















u
s
32




















w
v Line
Temperature
op
wl 1? I/


















\


















\
£
-) v o<
H



















3|S


















V
•^v
^J Ambient
Air
Temperature
op
x.\
* 7\0





































r
Lul Elevation *
1 "" Comments
£


















'

                                                                                                                                                        -~f<
                                                                                                                                                         t
                                                                                                                                                          o
U)
         COMMENTS :

-------
                                                      SCREENING DATA SHEET
Month
i


















>
^





'












/
s
3
o|f>-


















\


















f
Screening •
Team
0 J>

















. .. t
\




















c
•H 01
C 3
01 rH
oi id
H >
u
Ul
13












1







i3
0
0
0
r.
0
0
0
\0


p
0
L 10








1| « c
• 1







0
o
0
10

C-
|0


i^_
0
0)
U 01
o f-*
Ul
20
O
I
0
i
c
\
D
j -
10
1
I |0
0
1
te
0
e|lfc
\
o
0
^
HP
i
0
01-4-
4| D
I
c
VIQ
0
i
\
(
1 fi
KJ
K)
Process
Unit
|Z





































f
V
u
01
Ul
4
1
















¥
\
\
Primary
Material
s
25
|3>










L^
ft?















\f
^


\
fa

o
§
u
28




















Secondary1
Material
8
29




















u
3
32




















33
a
3
8 2
H (II
1
o
?\?.



•

,

O





^
/ ^ 5





\





•
kklo








/
/


\






7|o
71 o
UJ
^J
Line
Pressure
psig
1





































'
£k
>- Ambient
Air
Temperature
op
hlo





































^
c
o
•H
1
H
44)
^>


















f
03
8
u
45
-






z












                                                                                                                                          2_
COMMENTS :
                   1 I-*

-------
                                                      SCREENING DATA SHEET
Screen
Team
                                            o>
                                            c
                                            •rt 
                                                    U 41
                                                    M Q,
                                                    3 >,
                                                    0 H
                                                    U)
                                                       20
KJ
N)
                                                                      Primary
                                                                      Material
                                                                    25
                                                                            28
                                                                            Secondary
                                                                             Material
                                                                               29
                                                                                       32
ne
rat
F
Line
Pressure
psig
Ambient
Air
Temperature
°F
i  h.
di
                                                                                                                 IClo
                                                       di
                              181

                                                  C
Ul
                              Is 19
                                               \0
                                                    Q
                                                     0
                                                  o  i
                                                    10
                                                       0
                                                   10
                                                    .5
                                                             Z
                                       J(«
                                                                                                  0
                                                   jo
                                                   15
                                                  OL
 \/
                           I/

        COMMENTS:

-------
SCREENING DATA SHEET
Month
f |^













i


N

1
















/
2.
i
10
Q
3
0
















\
\
1
'"1
















f
o
o
B_
Screening
Team
0
















\
\








^







i
ol I
0
I
I"
•n"
*j,
Ul
5
^)
3
















>
3

a
So
3 w
B
1 v
I
1
G ^
o|p.
o|S
ibk
1
0|5
Molt,
\
/
/
/
/
o|y
o|#
oft
/ |0
/ ,
/I/ 12.
/
/
/ 3
/ 14
/I/ 5
/|/|£
J
/I-7
i \ i \Q
1 \ I |Q
h
\
1 b
'i|0
c
-H 01
C 3
U ,-(
U 10
Ul
13
1 1 1 1 Ic
1 10
0
e
0
0
\o
\0
lf>
0
0
o
10
10
IP

0
10
1 L o o o b

0)
U qj
U)
20
H/-,-.
0
Q
V:,

C|b
Oftf
C^x* | \-^S
\^, p^S
ci (
0|\
0
^
o|i
c

-------
                                                               SCREENING  DATA SHEET
x:
c
1
1
1
I
I
1
2
7.
1
z
7-
v i^













\














(0
a
3
1
1
O
o
II*
I
O
L|0
1













>
(














in
Screening
Team
0



\
3 ;



f \
O|1 ;













\













h4
J
c
11 01
= U
3 u a
H 31-1
J O
ji «
7 a
5



'
)








iN)

I?
/ \z\3
l\2\l
t 2.
k
/lzl£
l\?\7
1 \2\B
i \zto
/I?
/h

/u
I/ 5





O
;
^
?
Y
/I? 15
y ^|^
/|J|7
/ ? 1 ^
' 3 |c5
/Ml?
U IV
0
D>
C
•H 01
C 3
01 rt
oi id
8s*
Ul
13
IC?IS o o o
l^l/ola olo
Kloo o
|Q!O o o
i lolo olo
|0
|0
10
/ |z|o o\



















01
u
•H
01
O!
£


















Nfc
Pr imary
Material
Q
H
25
z






































u
c
0
o
28




















Secondary
Material
Q
H
29




















o
s
32




















$
Line
Temperature
°F
51^7






































u)
-J
Line
Pressure
psig




















*y Ambient
Air
Temperature
°F
|5|0




































J y
%
c
0
-H
0)
r-4
W
/-

















,
f
\
in
4-*
C
01
o
o
45

z








'
2








L
i
«
<>
e
(L
^
\
C
L-
2
•o
^J
        COMMENTS:

-------
                                               SCREENING DATA SHEET
reenin
Team
urc
ID
                                 13
Pro
Un
                                                              Primary
                                                              Material
                                                            25
                                                                   28
                                                           Secondary
                                                            Material
                                                                            32
ratu
p
Ul
Ul
Line
essure
psig
WJ
•J
bie
Air
era
°F
               o\l
               tMl
                                                         J5JQ
                                              J
        50
                           IV \9
                                   o
Jii
                                                  0
                                                   0
                                              c?
                            IvU
                                   \o
                                                 0
00
              1L
                                                 0
                                   0
                                                0
                                                 o
                                                 0
                                                                                '1
ii
>/
JI
J^
                                                0
ill
                         I   I  I
                                            A
                                                                                             1
                                                                                           1  1
                                                                                               Ait<

-------
            REPUBLIC STEEL
             GADSDEN PLANT
B-2  Screening Sheets for Sample Data
                  49

-------
     Card 1   (IF
                               SCREENING  SHEET

                               FOR SAMPLE DATA
1.  Radian Valve/Pump ID # I 0|7.| E|"A| 0 |o | Q| 2J        2.   Unit/Process^?^
3.  Plant Name
           Mo.  Day  Yr.
4.  Date
           1 \-2\l\Z
           11
6.  Before Tenting
    Screening Time
    (Military Time)
5.   Screener's ID
                                                          17
7.   Before Tenting  OVA  I  1   I  l^l
    Screening Value
                                           TLV Screening  Value
1

\
\1
\o
],-\
|O
                                                                3 1
8.  Screener's ID
                   38
9.  After Sampling   / \4\3\O
    Screening Time   ^1
    (Military Time)
10.   After Sampling OVA
     Screening Value
                               \3o\v\o
     TLV Screening
     Value
                                    1000
J^iublo
Comment 1
           59
                              Comment 2
                                           6 1
                                     50

-------
RADIAN
      Card  1   Is I  d
                           SCREENING  SHEET

                           FOR SAMPLE DATA
 1.   Radian  Valve/Pump  ID #
                                                 2.  Unit/Process
 3.   Plant  Name   I\P
-------
RADIAN
      Card 1
                               SCREENING SHEET

                               FOR SAMPLE DATA
 1.  Radian Valve/Pump ID #
                                                      2.  Unit/Process
 3.  Plant Name
           Mo.  Day  Yr.
 4.  Date
            \
                 t |0
            11
 6.   Before Tenting
     Screening Time
     (Military Time)
5.  Screener's ID   It) IP
                                                           1 7
 7 -  Before Tenting OVA
    Screening Value
                          j  | 51 Clo lob
                        2«*
                                           TLV Screening Value
                                                                3 1
                                      00
8.  Screener's ID
                   38
9.  After Sampling
    Screening Time
    (Military Time)
10.   After Sampling OVA
    „Screening Value
                                           TLV Screening
                                           Value
                                                           52
Comment 1
           59
                               Comment  2
                                           b 1
                                    52

-------
RADIAN
      Card  1
LS_
 1
                               SCREENING SHEET

                               FOR SAMPLE DATA
 1.   Radian Valve/Pump ID #
                                                      2.   Unit/Process
 3.   Plant Name  H0JuuJj£
            Mo.   Day  Yr.
 4.   Date   I/ \2\l \O
            1 1
 6.
    Before Tenting    / 1.51 /  |£)
    Screening Time   2 o
    (Military Time)
                                      5.   Screener's ID
                                                           17
 7.   Before Tenting OVA
     Screening Value     2l*
                                 \r \'•' I ' .   TLV Screening Value
                                                                 3 1
 8.   Screener's. ID
                    38
 9.   After Sampling
     Screening Time
     (Military Time)
10.   After Sampling OVA
     Screening Value
                                            TLV Screening
                                            Value
                                                            52
 Comment 1
            59
                                Comment 2
                                            6 1
                                       53

-------
RADIAN
     Card 1   Is.
SCREENING SHEET

FOR SAMPLE DATA
 1.  Radian Valve/Pump ID #
2.   Unit/Process
                                            -  fo l '
 3.  Plant Name
           Mo.  Day  Yr
4.  Date
/£
I \t\S\o
            11
 6.   Before Tenting
     Screening Time
     (Military Time)
       5.  Screener's ID
 7.  Before Tenting OVA
    Screening Value     21*
\ i
Y)
\o
\o \*

            TLV Screening Value
            I  \i\G\C\C\:
                                 3 1
8.  Screener's ID
                   38
9.  After Sampling
    Screening Time
    (Military Time)
10.  After Sampling 0V
     Screening Value
             'LV Screening
            Value
       (  I /lololoh
                                                           52
Comment 1
Comment 2
           59
                                           6 1

-------
RADIAN
      Card  1   LS_
               \
 1.   Radian Valve/Pump  ID
                               SCREENING SHEET

                               FOR SAMPLE DATA
                                                     2.  Unit/Process
                                                                           P>P
 3.   Plant  Name
           Mo.   Day  Yr.
4.   Date
              12
            1 1
 6.   Before Tenting    / ]/ \Q\S
     Screening  Time    20
     (Military  Time)
                                      5.  Screener's ID
                                                          17
7.   Before Tenting OVA
    Screening Value
                         2l*
                                           TLV Screening Value
                                                                         o |o ]o
                                                                3 1
 8.   Screener's  ID  \D\P\W
                    38
 9.   After Sampling   [ / [/ \4\S\
     Screening Time   ^i
     (Military Time)
10.   After Sampling OVA
     Screening Value    TsT
                               7|5|^k)|Q
                                           TLV Screening
                                           Value
 Comment 1  	I
            59
                               Comment  2
                                           6 1
                                   55

-------
RADIAN
      Card 1   Is I C
                               SCREENING  SHEET

                               FOR SAMPLE DATA
1.   Radian Valve/Pump  ID  #
                           V\2 \P \L> \&\ I |3|o
                                                      2.  Unit/Process
g.p.
3.   Plant Name
                            5fe/,
           Mo.  Day  Yr.
 4.  Date
                 \0
                                     5.  Screener's ID
                                                          1 7
 6.   Before Tenting   __/J / |  (|Q
     Screening Time   2 o
     (Military Time)
 7.  Before Tenting OVA
    Screening Value     2l*
I I7lo
o|c
,|o
                                          TLV Screening Value
                                                                     /  01
                                                               3 1
 !.  Screener's ID  I  I  |
                   38
9.  After Sampling
    Screening Time
    (Military Time)
10.  After Sampling OVA
     Screening Value
                                         NTLV Screening
                                         'Value
                                                           52
Comment 1  	I
           59
                              Comment 2
                                           6 1
                                 56

-------
RADIAN
      Card 1   IS
                          SCREENING SHEET

                          FOR SAMPLE DATA
 1.   Radian Valve/Pump ID #
                                                 2.  Unit /Process ('/dh> &P
 3.   Plant  Name   /7/^j.uitu.
           Mo.  Day  Yr.
     Date
1 12
l\l
Bp
            11
 6.
Before Tenting
Screening Time
(Military Time)
                                 5.  Screener's ID
                                                          1 7
 7.   Before Tenting  OVA
     Screening  Value
                             *L\H\0\0\0
                                      TLV Screening Value
\ \l \o\e\
c-\ i
                                                           3 1
 8.   Screener's  ID  L
                    38
     After Sampling
     Screening-Time
     (Military Time)
10.   After Sampling OVA
     Screening Value
                              \3\0\o\o\e
                                      TLV Screening
                                      Value
                                                           52
 Comment 1
            59
                               Comment 2
                                           6 1
                                     57

-------
RADIAN
     Card 1  Is I d
              i

    Radian Valve/Pump ID #


    Plant Name   / e.*f,i j)£r_
                               SCREENING  SHEET

                               FOR  SAMPLE DATA
                                                       2.   Unit/Process
           Mo.  Day  Yr.
 4.  Date
            11
 6.   Before  Tenting
     Screening Time
     (Military Time)
1 .   Before Tenting OVA
    Screening Value
                        2I+
8.   Screener's ID  I— I  I
                    38
9.  After Sampling
    Screening Time
    (Military Time)
                                      5.  Screener's ID   \&\PvO
                                                           1 7
I f
                                           TLV Screening Value
                                                                 3 1
10.   After Sampling OVA
     Screening Value
                                           TLV Screening
                                           Value
                                                            52
Comment 1
           59
                               Comment 2
                                           6 1
                                      58

-------
RADIAN
     Card 1  IsTcl
              i

1.   Radian Valve/Pump ID #
                               SCREENING SHEET

                               FOR SAMPLE DATA
0\2.\\AA\c\t
> 131*2.
                                                      2.   Unit/Process   \y R'F
 3.   Plant  Name
           Mo.  Day  Yr.
 4.   Date
            \
 &:.   Before Tenting
     Screening  Time    2o
     (Military  Time)
5.   Screener's  ID
                                                             |W
                                                          17
 7.   Before Tenting  OVA
                            \7\n\o\o\n
     Screening Value      2"*
     TLV Screening Value
                                                                3 1
 8.   Screener's  ID
                    38
 9.   After Sampling    \  |4 |4|o[
     Screening Time    ^ j
     (Military Time)
10.   After Sampling OVA
     Screening Value
                              Iflbloloh
                                           TLV  Screening
                                           Value
                          \ Is lo lo I V
                                                           52
 Comment 1
            59
                                Comment 2
                                           6 1
                                     59

-------
RADIAN
      Card  1
                               SCREENING SHEET

                               FOR SAMPLE DATA
 1.   Radian Valve/Pump  ID  #
                           Q|2.|V|A|o|o|7]3
                                                      2.  Unit/Process
                   n
 3.   Plant  Name    l(jL0<.JJLe.
           Mo.  Day  Yr.
 4.  Date   U I 2| 1  |2|8|O
            11
 6.   Before  Tenting    / jfT| 2| £>
     Screening  Time    20
     (Military  Time)
                                      5.  Screener's ID
                                                           17
7.   Before Tenting OVA
    Screening Value
  .  Screener's  ID
                         21
                                           TLV  Screening  Value
                                                                     I  1   1^1olo
                                                                 3 1
                      -^LJs&Jt )tJ££LfC,UVW. C0 fW\. SVt^AA*] <~W XLC/^^'i^-Wj*. riff
                    38
9.  After Sampling
    Screening Time
    (Military Time)
10.   After Sampling OVA
     Screening Value    "Vs*"
                                   ISIolo
                                           TLV Screening
                                           Value
                                                            52
Comment 1
           59
                               Comment 2
                                            e i
                                    60

-------
RADIAN
      Card  1   Is  I C
             SCREENING SHEET

             FOR SAMPLE DATA
1.   Radian Valve/Pump ID #
          
-------
RADIAN
      Card 1
   SCREENING  SHEET

   FOR SAMPLE DATA
 1.  Radian Valve/Pump ID #
                          2.   Unit/Process
 3.   Plant  Name
/
Mo . Day
4. Date / I-2- / |ff
±
6. Before Tenting

Yr.
&\C 5. Screener's ID Q> r\tJ
1 7
/I3WIS
     Screening  Time    20
     (Military  Time)
 7.   Before Tenting OVA
\/\0\<-->\
-------
RADIAN
      Card  1
   SCREENING SHEET

   FOR SAMPLE DATA
1.  Radian Valve/Pump ID #
"' [£ I \J \A \ O \ f [2. \ 2J
                                                       2.  Unit/Process
 3.   Plant  Name
            Mo.   Day  Yr.

 4.   Date   I/ 1.3 I / I
            11
 6.   Before Tenting     \tf\g ]p>
     Screening Time   2 o
     (Military Time)
          5.  Screener's ID
                                                           17
 7.   Before Tenting OVA
     Screening Value     21*
               TLV Screening Value
                                                                 3 1
 8.   Screener's ID
                    38
 9.   After Sampling
     Screening Time
     (Military Time)
 10.   After Sampling OVA
      Screening Value
1 1
\-S\o\o b
               TLV Screening
               Value
f
|-7k?bb
                               52
 Comment 1  	I
            59
    Comment  2
                                            6 1
                                      63

-------
RADIAN
     Card 1   OF
                   SCREENING SHEET

                   FOR SAMPLE DATA
 1.  Radian Valve/Pump ID #
                                          2.  Unit/Process
 3.  Plant Name
           Mo.  Day  Yr.
 4.  Date
/ 12 /I/
            11
     Before Tenting
     Screening Time
     (Military Time)
5.   Screener's ID   Ifl P
                                                          1 7
    Before Tenting OVA
    Screening Value
                               TLV Screening Value
                                                    3 1
 8.   Screener's ID
                   38
 9.  After Sampling
    Screening Time
    (Military Time)
 10.  After Sampling OVA
     Screening Value
1 1
1 1 Ifl
                               TLV
                               Value
         Screening     (III  \B\C
                                                           52
Comment 1    I
           59
                   Comment 2
                                           6 1
                                      64

-------
RADIAN
     Card 1  Is  I cl
              i

1.   Radian Valve/Pump  ID #
                               SCREENING SHEET

                               FOR SAMPLE DATA
0 \2 \ V\A \ 0\ I \3-\tl
                                                     2.  Unit/Process
 3.   Plant Name
           Mo.  Day  Yr.
 4.   Date
                  TTaol
            11
     Before  Tenting
     Screening Time   20
     (Military Time)
           5.  Screener's ID   \D \P \i\,
                                                          1 7
 7.   Before_ Tenting OVA
                           I  \0\0\0\0\t
     Screening Value     2l*
               TLV Screening Value
1 V
°\
o
£j
I
                                                               3 1
 8.   Screener's  ID
                    38
 9.   After  Sampling   [ / \@ \\
     Screening Time
     (Military Time)
 10.   After  Sampling OVA
      Screening Value
          o|o
                                          TLV Screening
                                          Value
                               52
 Comment  1
            59
                               Comment 2
                                           s i
                                    65

-------
     Card 1  Is I cl
              i

1.  Radian Valve/Pump ID #
                   SCREENING SHEET

                   FOR SAMPLE DATA
0\2.\V\A \0\t
                                          2.  Unit/Process
3.  Plant Name
           Mo.   Day  Yr.
4.  Date
t\2
           11
6.  Before Tenting   /
    Screening Time   2o
    (Military Time)
           5.   Screener's  ID
                                                          1 7
7.  Before Tenting OVA
    Screening Value
                               TLV Screening Value
                                                    3 1
                                              Kdolo
                                                                                 c-1
8.  Screener's ID
                   38
9.  After Sampling    /
    Screening Time
    (Military Time)
10.   After Sampling OVA
     Screening Value

\f
1 -~
ID
0
°\
G
                               TLV Screening
                               Value
                                  f  I  I H -K
                                  I  I  I i  \u\o
                                                           52
Comment 1
           59
                   Comment 2
                                           61
                                    66

-------
RADIAN
      Card  1
                               SCREENING  SHEET

                               FOR SAMPLE DATA
1.   Radian Valve/Pump ID #
                             \3.\\/\A\O\t \2\
                                                      2.  Unit/Process
 3.   Plant  Name
           Mo.   Day  Yr.
 4.   Date
            11
 6.   Before Tenting
     Screening  Time
     (Military  Time)
                                      5.   Screener's  ID
                                                          1 7
 7.   Before  Tenting  OVA
     Screening Value      2l*
                                  c^loio
                                           TLV  Screening Value
                                                                3 1
 8.   Screener's  ID
                    38
 9.   After Sampling   | /
     Screening  Time
     (Military  Time)
10.   After Sampling OVA
     Screening Value
                                           TLV Screening
                                           Value
                                                           52
 Comment  1
            59
                               Comment 2
                                           6 1
                                      67

-------
 REPUBLIC STEEL
  GADSDEN PLANT
B-3  Sample Data
      68

-------
       Card 1  II \S\
                i
                              SAMPLE DATA SHEET
1.   Radian Valve/Pump ID# |O|2.|£|%| O|Q|O|2.|  2.   Unit/Process
                           3
3.  Plant Name
           Mo.   Day
4.  Date
6.  Time
          11
            \* \0\0\
          20
    (Military Time)
               25
10.   Meter #1 I   l^m.


11.   Time #1
                 I  I  |Q
               37
14.  Temp #1 °F
                 "t5
16.  Bar. Press., in. Hg.
                          3|o| .
                          51
18.   DGM
     Factor

20.   Vol.  Org.
     Condensate ml
                    61
                    66
21.  Coll. time, minutes
                                      5.   Sampler's Initials
                                                              17
                                    7-   Cart  ID#  I 1 I  8.  N.B.# 	  9.  Page #
                                      12.   Meter #2
                                                            .IQISI
                                      13.   Time  #2   I  I   I
                                                     if i
                                      15.   Temp  #2  °F
                                                       1*8
                                       17.   AP,  in. Hg.
                                                                 •I.ISI5
                                                              56
                     11 . lOlllSI      19.   Meter #
                            I  I J 15 I   22.   Specific Gravity  I	I
                          71.
                                           of Organic
                                           Condensate
                                                             75
23.  Comment
              78
                                        69

-------
       Card 1
                              SAMPLE DATA  SHEET
1.  Radian Valve/Pump ID# |o| 2.| E.|:*| o |o | o|-z.| 2.  Unit/Process
                           3
                                                                     cote
3.  Plant Name
           Mo.  Day  Yr.
4.  Date
6.  Time
           11
                 10.
           20
     (Military Time)
                                      5.  Sampler's Initials
                                                               17
                                    7.  Cart ID# l2j  8.  N.B.i
                                                                      9.  Page
10.   Meter #1 IH3I51 .1111
               25
11.  Time #1     I  I  1°
14.  Temp #1 °F  I  1 ~l\o
                                      12.  Meter #2
                                                          J5|. |S1Z
                                      13.  Time #2   I  I   I
                                      15.  Temp #2 °F  I  I "71
16.  Bar. Press., in. Hg.

                          5 1
18.  DGM Correction]
     Factor
20.  Vol. Org.      I—
     Condensate ml  66
                                       17-   AP-  in.  Hg.
                                                                1  Ul. U
                                                              56
                                      19.   Meter #
                                                         ~7/
21.  Coll. time, minutes
                                      22.   Specific Gravity  |	|
                                           of Organic        7S
                                           Condensate
23.  Comment
              73
                                       70

-------
       Card  I
                             SAMPLE DATA SHEET
1.   Radian Valve/Pump ID# |O|2.l£r|X| o|o|O|^|  2.  Unit/Process   Qo)c£
                          3
3.   Plant Name
4.   Date
6.  Time
 Mo.   Day  Yr.
I i [7.1 1 |-2,| 6|Q
11
          rrrn
          20
    (Military  Time)
                                     5.   Sampler's Initials 1-PlWl
                                                            17
                                   7.   Cart  ID# LU  8.  N.B.i
                                                          9.   Page #
  .   Meter #1 I  I   1  Ife If H
10
11.  Time #1
               25
               37
14.  Temp #1 °F I  HIP I
        r
16.   Bar.  Press.,  in. Hg.
                          3M.
18.  DGM Correction
     Factor

20.  Vol.  Org.
     Condensate ml
                   66
                           12.   Meter  #2  I bl
-------
coopommoM
       Card  1   II  Isl

                 i
                               SAMPLE DATA SHEET
 1.  Radian Valve/Pump  ID#  I o|z|&|y. | o\o |o.| 4 |  2.  Unit/Process     c. o
                            3
 3.  Plant Name
4.



6.
           Mo.  Day  Yr.

    Date  I M3.ll  I^J&IQ
          11
Time  I   I  I  I   I
      9 n
(Military Time)
                                       5.   Sampler's Initials
                                                               17
                                     7.   Cart ID# I"21   8.  N.B.i
                                                                       9.  Page #
10.   Meter #1 I   l^ni-l'
               25
11.  Time #1
                37
14.  Temp #1  °F
                                       12.   Meter #2  \_\ti\\° I .
                           5 1
18.  DGM Correction  -H". I <•> I 51
     Factor          ^,  ^
20.  Vol. Org.      I—I—I—I—L
     Condensate ml  66
                                       17-  AP, in. Hg.



                                      19.  Meter #
1 131.
IV
                                                               56
21.  Coll. time, minutes  I  I   I i |5
                                      22.  Specific Gravity
                                           of Organic         7S
                                           Condensate
23.  Comment
              78
                            7
                                        72

-------
RADIAN
       Card  1   ll  Isl
                              SAMPLE DATA SHEET
 1.   Radian Valve/Pump  ID# WZ, \-Pti I 1 \ 0\ Z-l ) \  2.   Unit/Process
 3.   Plant  Name
            Mo.   Day   Yr.
 4.   Date
 6.   Time
            /IZJ /\0
           11
     (Military Time)
                                      5.   Sampler's Initials  ]F&-\
                                                              I 7


                                    1.   Cart ID# [I]   8.   N.B.# 	  9.   Page #
 10.   Meter #1
 11.   Time #1
                25
                3 7
 14.   Temp #1 °F |	[
                  1*5
                                      12.   Meter
                                      13.   Time #2
                                      15.   Temp #2 °F
 16.   Bar.  Press.,  in.  Hg.
3p|. \Z\
                           5 I
                                       17.   AP, in.  Hg.
18.   DGM Correction, _/J_i
                                       19.   Meter #
      Factor
                     61
 20.   Vol.  Org.
      Condensate ml
                       I  I   I
                    66
 21.   Coll.  time,  minutes.
                                      22.  Specific Gravity I   1  1
                                           of Organic
                                           Condensate
                                                              75
 23.   Comment
               78
                                     73

-------
RADIAN
       Card 1
                              SAMPLE DATA SHEET
1.  Radian Valve/Pump ID# I 0\ Z| P\M\<%\tf\2\£ I  2.  Unit/Process
                           3
3.  Plant Name
           Mo.  Day  Yr.
4.  Date
6.  Time
           /rz-
                /i/
     (Military Time)
5.   Sampler's Initials
                                                              1 7
                                    7.   Cart  ID#
                8.   N.B.#
9.   Page # 	
10.  Meter #1
               25
                                      12.   Meter  #2
                           3
11.  Time #1
                                      13.   Time  #2
14.  Temp #1 °F  \
16.  Bar. Press., in. Hg.
                          3ioi ,
                          5 1
                    6 1
18.   DGM Correction,
     Factor

20.   Vol.  Org.
     Condensate ml  66
                                      15.   Temp  #2  °F
                                                       1*8
                                       17.   AP',  in.  Hg.
                                      19.   Meter #
                                                              56
21.  Coll. time, minutes
                                      22.   Specific Gravity I	L
                                           of  Organic
                                           Condensate
                                                             75
23.  Comment
              78
                                     74

-------
RADIAN
                                                            UMIT
       Card 1
                              SAMPLE DATA SHEET
1.   Radian Valve/Pump  ID#
 3.  Plant Name
                                   \4\/ \/ ff \ 2.  Unit/Process
                           3  '
           Mo.  Day  Yr.
4.  Date
 6.  Time
           11
           /!/ if Ifll"
           20
     (Militax-y Time)
 10.  Meter #1
 11.  Time #1
 14.  Tenro
               25
 16.  Bar. Press., in.
                          5 1
 18.  DGM Correction.
     Factor

 20.  Vol. Org.
     Condensate ml
                    6 1
                    66
 21.  Coll. time, minutes
                          71
                                      5.   Sampler's Initials
                                   7.  Cart ID#
8.   N.B.#
                                                    31
                                     12.  Meter #2 Iffl/ l7lx


                                     13.  Time #2
                                     15.  Temp #2 °F
                                                        14131
9.   Page #
                                      17.  AP, in.  Hg.
                                                                 I/I,
                                                             56
                                     19.  Meter #
                                     22.  Specific Gravity
                                          of Organic
                                          Condensate
                                                            75
 23 .  Comment
              78

-------
RADIAN
       Card 1
                              SAMPLE DATA SHEET
  .  Radian Valve/Pump ID# ft" 1^1 F\U f0l /I A°\ 2.  Unit/Process
3.  Plant Name
           Mo.  Day  Yr.
4.  Date
>;  Time
                    TJO
           11
  5.   Sampler's Initials


7.   Cart ID# [7
                                                              17


                                                      8.  N.B.#
     (Military Time)
10.  Meter #1
11.  Time #1
               25
                                      12.   Meter #2 lf[? J^l - I/
14.  Temp #1 °F  I
16.   Bar.  Press.,  in.  Hg. 13l £J •
                          5 1
18.  DGM CorrectionJZ_L_L^i2E
     TT^i^*- «-«.         6 1
                                     13.  Time #2


                                     15.  Temp #2 °F


                                      17.  AP, in. Hg


                                     19.  Meter #
                                                                      9.   Page #
                                                                  I/L,
                                                              56
     Factor
20.  Vol. Org.
     Condensate ml  6S
21.  Coll. time, minutes
                                      22.   Specific Gravity
                                           of Organic
                                           Condensate
                                                             75
23.   Comment
              78
                                     76

-------
RADIAN
        Card  1   Ills
                              SAMPLE DATA SHEET
 1.   Radian Valve/Pump  ID# \O\Z\ \/\/h£\ti l5 |£l  2.  Unit/Process


 3.   Plant  Name
           Mo.   Day   Yr.
 4.   Date
 6.   Time
           11
     (Military Time)
                                      5.   Sampler's  Initials


                                    7.   Cart ID# \J_
        1 7


8.  N.B.#
 10.   Meter //I
 11.   Time
                25
                37
 14.   Temp #1 °F
                  1*5
                                      12.   Meter #2
                                      13.   Time #2
                                      15.   Temp #2 °F
                                                        1*8
9.   Page #
 16.   Bar.  Press.,  in.  He. l5l^l .  I 2\O\  17.   AP,  in.  Hg.
                     6 1
18.   DGM Correction,
     Factor

20.   Vol. Org.
     Condensate ml
 21.   Coll.  time,  minutes
                                       19.   Meter #
                                      22.  Specific Gravity I   I  I
                                           of Organic        7S
                                           Condensate
 23.   Comment  	I
               78
                                    77

-------
       Card 1   1
                              SAMPLE DATA  SHEET
1.  Radian Valve/Pump ID# \0 &-\}/ ffil U\^\1\2>\  2.   Unit/Process
3.  Plant Name
           Mo.  Day  Yr.
4.  Date
6.   Time
                / i
    (Military Time)
                                      5.  Sampler's Initials
                                                               1 7
                                    7.  Cart ID#
8.  N.B.#
9.  Page #
10.  Meter #1
               25
                                      12.  Meter #2
11.  Time #1
                                      13.  Time #2
14.  Temp #1 °F  I  17l P|
                                      15.  Temp  #2  °F
16.  Bar. Press., in. Hg.
                          5 1
18.  DGM Correction]/L
     Factor
                    6 1
20.  Vol. Org.
     Condensate ml  ss
                                       17.  AP; in. Hg.
                                                                   I/
                                                               56
                                      19.  Meter #
21.  Coll. time, minutes    I  I   u.
                                      22.  Specific Gravity  I   !  I
                                           of Organic         7S
                                           Condensate
23.   Comment
              78
                                      78

-------
RADIAN
        Card  1   Ills
                              SAMPLE DATA SHEET
 1.   Radian Valve/Pump  ID# \O\'Z\]/\ft\ £)!/ |Z| /i 2.  Unit/Process
                            3
 3.   Plant  Name
           Mo.  Day  Yr.
 4.   Date
 6.   Time
           \ I
                                     5.  Sampler's Initials


                                    7.  Cart ID# \±\  8.  N.B.#
                                                              1 7
     (Military  Time)
 10.   Meter #1  2|7|7l.


 11.   Time #1
                                      12.  Meter #2  \2\Z\3- |JT7


                                      13.  Time #2
 14.   Temp #1 °F I   ffl 7
                                      15.  -Temp #2 °F
 16.   Bar.  Press.,  in.  Hg.
                                   If
                           5 1
17.   AF,  in.  Hg.
                              9.  Page #
                                                                  IZI
                                                              56
                     6 1
18.   DGM
     Factor

20.   Vol.  Org.
     Condensate ml
 21.   Coll.  time,  minutes
                                       19.  Meter #
                             i  i  14
                          71
                                      22.   Specific Gravity  I	L
                                           of  Organic        75
                                           Condensate
 23.   Comment
               78

-------
RADIAN
       Card 1
                               SAMPLE  DATA SHEET
1.  Radian Valve/Pump ID# \&\2-\{/\A&\ J \Z\Z»  2.   Unit/Process
3.  Plant Name
           Mo.  Day
4.  Date
6.  Time
              Zl Xl/ I
           1 1
               I
           20
     (Military Time)
10.  Meter #1
11.  Time #1
               25
14.  Temp #1 °F  |	I
                 1*5
16.  Bar. Press., in. Hg. I 3\O I .
                          5 1
18.   DGM Correction! /I - lOl e?\ &
     Factor         °^

20.   Vol.  Org.
     Condensate ml
                    66
21.  Coll. time, minutes
23.  Comment
              78
                                      5.  Sampler's Initials
                                                               1 7
7:   Cart ID#
                                      12.  Meter #2
                                      13.  Time #2
                8.  N.B.#
                         If l
                        ^^™^™^
                                      15.  Temp #2  °F  1
                                                       1*8
 17.  AP, in. Hg.


19.  Meter #
                                                                      9.  Page  #
                                      22.  Specific Gravity
                                           of Organic
                                           Condensate
                                                              7S
                                     80

-------
RADIAN
        Card  1   Ills
                              SAMPLE DATA  SHEET
 1.   Radian Valve/Pump  ID# \O\Z-\ i/Vfl£M A?J&\ 2.  Unit/Process
 3.   Plant  Name
           Mo.   Day   Yr.
 4.   Date
 6.   Time
                  I/
                                      5.   Sampler's Initials
                                                              1 7
     (Military  Time)
 10.   Meter #1
 11.   Time #1
 14.   Temp #1 °F
                25
                                      12.  Meter  #2
                                      13.   Time  #2
                                      15.   Temp  #2  °F
                                                         \3\7
                           5 1
16.   Bar.  Press., in.  He. \2>\O\ •  \ I!% I  17.   AP,  in. Hg.


                                      19.   Meter #
                                                              56
 18.   DGM -Correction]/
      Factor         61
 20.   Vol.  Org.
      Condensate ml
 21.   Coll.  time,  minutes
                                      22.   Specific Gravity  I	1
                                           of Organic        75
                                           Condensate
 23.   Comment
                                    7.   Cart  ID#  0  8-  N.B.# 	  9.  Page #
               78
                                     81

-------
RADIAN
       Card 1
                              SAMPLE DATA SHEET
1.  Radian Valve/Pump ID# U7l 21 *!$ \U\ / 1 2)^  2.  Unit/Process
                           3
3.  Plant Name
           Mo.  Day  Yr.
4.  Date
6.  Time
                    B53
     (Military Time)
5.  Sampler's Initials
                                                              1 7
                                    7.   Cart ID# [7]   8.   N.B.# 	  9.   Page #
                                                 ztr             	
10
  .   Meter //I M
-------
RADIAN
        Card  1
                               SAMPLE DATA SHEET
1.  Radian Valve/Pump ID# \0\Z-\V\ft\O\
                           3
 3.   Plant  Name
                                                2.   Unit/Process
            Mo.   Dav  Yr.
 4.   Date
 6.   Time
           11
                                      5.  Sampler's Initials
                                                               1 7
     (Milita2ry Time)
10.   Meter #.
 11.   Time #1
 14.   Temp. #1 °F
                ZT5
                       , I  <3O\
                                    7.  Cart ID//
                                       12.   Meter #2
                                      13.  Time #2
                                      15.  Temp #2 °F
                                                      8.  N.B.#
9.  Page #
16.  Bar. Press., in. He. I"3|Q| . I / I JT 17.  AP, in. Hg.


                   JZjLJL^l2lS]      19-  Meter #
                                                               56
18.  DGM Correction,
     Factor

20.  Vol. Org.
     Condensate ml
                     6 1
                     66
 21.   Coll.  time, minutes
                                       22.   Specific Gravity
                                            of Organic
                                            Condensate
                                                              75
 23.   Comment
               78
                                       83

-------
       Card 1
                              SAMPLE DATA  SHEET
1.  Radian Valve/Pump ID# \&\2rf\A\&\ /\ttf \  2.   Unit/Process
3.  Plant Name
           Mo.  Day  Yr.
4.  Date
6.  Time
    (Military Time)
                  5.  Sampler's Initials
                                                               1 7
                7.  Cart ID# FT]  8.  N.B.# 	  9.  'Page  #
10.  Meter #1
                  12.  Meter /r'2
11.  Time #1
               3 7
                  13.  Time #2
14.  Temp #1 °F
16.  Bar. Press., in. He. P PI- I/ iff
                  15.  Temp #2 "F
                                                       "*8
                          5 1
                   17.  AP, in. Hg.
                                               LZl
                                                               56
18.  DGM Correction!/ I ~ \O\(?\ 8\      19.  Meter #
     Factor
20.  Vol. Org.
     Condensate ml
                      I  I
66
21.  Coll. time, minutes I   I  I
                  22.  Specific Gravity
                       of Organic         7S
                       Condensate
23.  Comment
              78
                                       84
       332-

-------
 REPUBLIC STEEL
  GADSDEN PLANT
B-4  Analysis Data
      85

-------
 TABLE  B-4.1   COMPONENT  CODES FOR ANALYSIS DATA  SHEETS
	Code	Component	
     001                     Methane
     012                     Benzene
     888                     OVA reading for sample bag
     997                     Hexane
     998                     Non-methane HC
     999,777                  OVA reading for ambient air bag
                         86

-------
1.  Radian Valve/Pump ID#  0
                                   ANALYSIS DATA SHEET
                                     (AMBIENT AND BAG)

                                   6*
                                        0| O|O |Z
                                                       2.   Unit/Process
3.  Plant Name  Y^JT) llVlliV-  S-Wj
           Mo.    Day   Yr.
4.  Date
                  \|3L
           11
 6.  Time (Military)    \  161010
                      20
                                              5.  Analyst's Initials   Q|

                                              7.  N.B. #
                                                                       17
                                                                  8.  Page
 9.  Instrument HP  5150
                                       Z
                                       24
 AMBIENT AIR
 Component Code
                         ppmj
                                             BAG SAMPLE
                                             Component Code
                                                                    ppmw/3-
Card 2     2 i A   Duplicate columns 3  through  10  from  Card  1
Remarks:
                                         87

-------
                                   ANALYSIS DATA SHEET
                                     (AMBIENT AND BAG)
 1.  Radian Valve/Pump ID#
   o
               oo
                                  2.   Unit/Process
 3.  Plant Name
 4.   Date
            Mo.   Day   Yr.
3L
|0
            11
 6.  Time  (Military)
 9.   Instrument  HP
     Slo
5.  Analyst's Initials

7.  N.B. #
                                              17
                                         8.   Page
                      20
                                       24
 AMBIENT AIR
 Component Code
     ppmw
                    BAG  SAMPLE
                    Component Code
Card 2     2 I A   Duplicate columns 3 through 10 from Card 1
                      ppmw
                                                               37
                                                               55
                                                               73
                                                                     ppmw
                                                               23
1 1
1 1
                                                               41
                                                               59
Remarks:
                                          88

-------
                                   ANALYSIS DATA  SHEET
                                     (AMBIENT AND  BAG)
1.  Radian Valve/Pump ID#
 3.  Plant Name
         H< C] \0 \C\
                                                       2.   Unit/Process
 4.  Date
            Mo.   Day   Yr.
           11
6.   Time  (Military)   _\

9.   Instrument
                                                                        17
                                                                   8.   Page
                     5.  Analyst's Initials   CL|Q | (p

                     7.  N.B. #
                                        24
 AMBIENT AIR
 Component Code
ppmr
                                             BAG SAMPLE
                                             Component Code
1.
t
'l^flX


25
2.





43
3.

61
Card 2


Component
4.







2|A
Dv
1
Code






11
5.




29
6.
1
47
117




<

rani.
tj
28

46




|

1






64
iplicate columns 3
ppmw
r~

1


14


|


32


1


>5^ 	 	 -





through 10 i
Com]

1
C{ ft fg
34
S*>^
'
52

.xTv
i


cy





70
from Card 1
jonent Code
1



20
^1^1^
38

56


==s-

37


I/



55

73

23

41
™»—
by
£
^
\-S

1
I
5




) ll


• 1 i

|


ppmw
1

|

A


P

ft
j
•H-

^
6
h=>-

OP

L/*\l /\-
U 1 '-*i

•
Remarks:
                                         89

-------
1.  Radian Valve/Pump ID#
 3.  Plant Name
                                   ANALYSIS DATA SHEET
                                     (AMBIENT AND BAG)

                                   £ X
                            o\"2. \*-\-tc\ o| o |o \1
                                                      2.  Unit/Process
 4.  Date
             Mo.    Day   Yr.
            i  T.
            11
                                             5.  Analyst's Initials    C|J | &•
                                                                       17
6.  Time (Military)
 9.  Instrument
                        \\$
o   N.B.
                                                                 8.  Page
                      20
                      3olC TH
                                       24
 AMBIENT AIR
 Component Code
                        ppmw
                                            BAG SAMPLE
                                            Component Code
1.
2.
3.
Card
Compc
4.
5.
6.
ih

l»
25
I

43
|
61
2
ment



2 | A
Dt
1
Code

1

11
1

29
i|n
~7



B|-J| .
4
28


1 I

46


1 I

64
iplicate columns 3
ppmw


1 1

14


I 1

32
|
1 !

through 10 i
Com]


°l
^
•a
34



52
1


70
from Card 1
jonent Code




20



38
6
e
8

1 J 5|5 1. 1
37
1 I 1
55
1 1 1
73
ppmw
1 1 1
23
1 1 1
41
1 1 1-7 le lo
    47
Remarks:
                  50
  56
                                                               59
                                        90

-------
                                   ANALYSIS  DATA SHEET
                                    (AMBIENT AND BAG)
1.  Radian Valve/Pump ID#
                                       | 6 \Q |Q |^ J   2.   Unit/Process
 3.  Plant Name "VJSLpU In I iV^  S-UjLJ
            Mo.   Day   Yr.
 4.  Date
           V
XiO
           11
 6.  Time (Military)    1 | (p| \ |Q
5.  Analyst's Initials   Cj3l£

7.  N.B.  *
 9.  Instrument
              M
                      20
                                       24
 AMBIENT AIR
 Component Code
  ppmw
                                            BAG SAMPLE
                                            Component Code
                                            PPmw
Remarks:
                                        91

-------
                                   ANALYSIS DATA SHEET
                                    (AMBIENT AND SAG)
 1.  Radian Valve/Pump ID#
 3.  Plant Name
02.
oo  P
                                                      2.   Unit/Process
 4.  Date
            Mo.   Day   Yr.
            11
                  1  -3.
 6.  Time  (Military)    1  | to \ I |o
                                                                       17
                                                                  8.   Page
      5.  Analyst's  Initials    C| J[6-

      7.  N.B.  #
 9.   Instrument
                      20
                       3
-------
                                ANALYSIS DATA SHEET
                                  (AMBIENT AND BAG)
1.  Radian Valve/Pump ID*  Q|j2l'g-U.I OlAiriT?
                                                  2.  Unit/Process
                                                                  Cob
3.  Plant Name  \<£r?VK.V3\ \ C
 4.  Date
           Mo.    Day  Yr.
             2_10&iQ
          11
                                          5.  Analyst's Initials   CiTTl G
6.  Time (Military)

                                           7.  N.B.
                     20
                                                                  17
                                                             8.  Page
9.  Instrument
              VlP  ^T\ ^0  O
                                    24
AMBIENT AIR
Component Code
                       ppmv
                                         BAG SAMPLE
                                         Component Code
                                                               ppmw
                                                              U.i9i?i5l  '&
                  50
                                                          59
Remarks:
                                      93

-------
 1.   Radian Valve/Pump ID#
                                    ANALYSIS DATA SHEET

                                     (AMBIENT AND BAG)
          | V-4-A-
                                                      2.  Unit/Process
                                                                              » !<•*•
 3.   Plant  Name
 4.   Date
             Mo.    Day   Y'r.
                 i
8
            11
6.  Time (Military)


9.  Instrument  HP
                       20
                                        24
5.  Analyst's Initials    C I 3* I
                                               7.   N.B.
 AMBIENT AIR

 Component Code
                         ppmw
                    28
                   46
                      BAG SAMPLE

                      Component Code
                   64
Card 2     2 | A  Duplicate columns  3  through 10 from Card 1
          1
                         ppmw
                   14
                   32
                   50--
                      ppmw
                                                                 t\t I
                                                               37
                                                               55
                                                               73
                                                                     ppmw
                                                               23
                                                               41
                                                               59
Remarks:
                                        94

-------
                                    ANALYSIS DATA SHEET
                                     (AMBIENT AND BAG)

                                    ? UL
 1.  Radian Valve/Pump  IDf   |0 \0*\ VfArf^lO Qj I |   2:.'  Unit/Process Qj toL-. "P \
3.   Plant  Name
                                         A
Mo. Day Yr.
4. Date \ I £. \ \ 6 ?)|0
11
6. Time (Military) | ]_iolO[O
20
rrj
9. Instrument Dv^fiTX OU\ C_ *
0

5. Analyst's Initials C | ^f 1 6
17
7- N.B. # 8. Page #

"rtC i
TT







 AMBIENT AIR
 Component Code
ppmw
                                             BAG SAMPLE
                                             Component Code
1.
O
l6]!^

25 '
2.
1


43
3.
1
61
Card 2

Component
4.
5.
6.



i/fn
28

46

. |0|5
1 1 ft
o\
i^iS

34

1 1


1 1

52


1

64
2 ! A j Duplicate columns 3
1
Code
1
11


|
29
Hll




1


ppmw

14

32



1


1 1

70
through 10 from Card 1
Component Code

1 1

20


1


1 1

	 ' — JO

\
°\
\C)\0

Ci

1^/1^1^155 10
37
I 1 1 1 1
55
Mill
73
ppnw
1 1 1 1 1
23
Mil!
41
CQ
     47

Remarks:
                                         95

-------
1.  Radian Valve/Pump  ID#
3.  Plant Name
            Mo.   Dav   Yr.
4.  Date
           11
           i &  no
                                   ANALYSIS  DATA SHEET
                                    (AMBIENT AND BAG)

                                  P  U.S	
               "H«gH£r |Q
                                                      2.   Unit/Process
              S-\--ee, \
 6.  Time (Military)
 9.  Instrument
                           5.   Analyst's Initials

                           7.   N.B.  #
 AMBIENT AIR
 Component Code
                        ppmw
IkHi ,
|5|3
                   28
                   46
                          BAG SAMPLE
                          Component Code
                   64
Card 2   [_2 | A j  Duplicate columns  3  through 10  from  Card  1
          1
                         ppmw
                   14
6.
                   32
50
                                                              59
Remarks:
                                        96

-------
                                 ANALYSIS DATA SHEET
                                   (AMBIENT AND BAG)
                1
1.  Radian Valve/Pump ID#

3.  Plant Name

4.  Date
                           3
                           V C_
                                                    2.  Unit/Process
                                                                     (V,W  P\
           Mo.   Day   Y'r.
                 Vi\
          11
6.  Time (Military)
9.  Instrument
                                             5.   Analyst's Initials   Cl3"lG

                                             7.   N.B.  #
 AMBIENT AIR
 Component Code
                        ppraw
                                           BAG SAMPLE
                                           Component Code
    47
Remarks:
                  Q\/-f\~
                                       — nx \A.
                                    0
                                    97

-------
                                  ANALYSIS DATA SHEET
                                    (AMBIENT AND BAG)


                                  ?  u. S
1.  Radian Valve/Pump ID#
3.  Plant Name
                                   2.   Unit/Process
                                                                     GJ kx_
4.  Date
            Mo.   Day   Yr.
           11
6.   Time (Military)   j

              H£
9.  Instrument
                           5.   Analyst's  Initials


                           7.   N.B.  t
                                      24
 AMBIENT AIR

 Component Code
1.
2.
3.
      ppmw
                                            BAG SAMPLE

                                            Component Code
                                     273.1
                   28
                   46
                   64
Card 2   [_2 j A j  Duplicate columns 3 through 10 from Card 1
          1
                         ppmw
                   14
                   32
6.
50
                                               I
                                           37
                                           55
                                            73
                                                                    ppmw
                                           23
                                           41
                                                              59
                                                                                135M
                                                                                 t3^53
Remarks:
                                            rxvt/

-------
                                                                                 =#-2.
1.  Radian Valve/Pump ID#   0
                                  ANALYSIS DATA SHEET
                                    (AMBIENT AND BAG)

                                  P  UL S
                                           )  I )  l°f I  2.  Unit/Process
3.  Plant Name
         3**
                    UL    i
4.  Date
            Mo .    Day   Yr .
             ia
           11
 6.  Time (Military)     1 I'SU 1 I"7?
                                         5.  Analyst's Initials

                                         7.  N.B. #
9.   Instrument
             !) U mYA ?)0\ C
             •
                                      24
 AMBIENT AIR
 Component Code
                        ppmr
1.
2.
3.
'Mi*
2L5
1 !
43
1 1

i i m^n*
28
1 1 1 1 1
46
1 1 1 1 1
                                        BAG  SAMPLE
                                        Component Code
                                                                   ppmw
61
                   64
Card 2   I 2 I AJ  Duplicate  columns 3 through 10 from Card 1
          1
Component  Code
4.
5.
6.
Remarks:
                    ppmw
                   14
                   32
                   50
                                                              37
                                                              55
                                                              73
                                                                    ppmw
                                                              23
                                                              41
                                                              59
                                       99

-------
1.  Radian Valve/Pump
3.  Plant Name
                                  ANALYSIS DATA SHEET
                                    (AMBIENT AND BAG)

                                  ? u. 5	
               l 19
2.   Unit/Process
SWJ
Mo. Day 'Yr.
4. Date I I <-A I
11
6. Time (Military
ElD
9. InstrumenfTTftL-
1^ ^0 5. Analyst's Initials C_\ \

) i \-3\ \\C
17
SG

7- N.B. # 8. Page #
20
5130 &c ra
24
 AMBIENT AIR
 Component Code
1.
2.
3.
             BAG SAMPLE
             Component Code
                   46
                   64
Card 2   j 2 : A   Duplicate columns 3 through 10 from Card  1
                   14
                   32
                  50
                        ppmw
                                                              37
                               55
                               73
                                                                    ppmw
                               23
                               41
                               59
                                                                                6 6
Remarks:
                                       100

-------
                                   ANALYSIS  DATA SHEET
1. Radian Va
3. Plant Nam
M
4. Date \
11
(AMBIENT AND BAG)
1| A
1 ? u. 5
Ive/Pump ID* 0 Q.| V-fsUJ-Q-l 1 |^|0 2. Unit/ProcessC ^ kjzJll CU"\T
3
elv2_Du_b ^c_ IbAccJ
\
o. Day Yr.
1^- III ^5|(3 5. Analyst's Initials Cl 3l 
-------
                                  ANALYSIS DATA SHEET
                                   (AMBIENT AND BAG)
                                    UL S
1.  Radian Valve/Pump ID//
                           Ql^4v*U+&  1 PJ^I   2.  Unit/Process C,7, VOL  "P \ CU
3.  Plant Name
              T^IDU.\0 \ \
                           C
            Mo.    Day   Tr.
4.  Date
            '\ ^ \ | I
           11
6.  Time (Military)    \
9.  Instrument
              HV  5150GC
                                      24
                                             5.  Analyst's Initials
                                             7-   N.B.
 AMBIENT AIR

 Component Code
1.
                        ppmw
                           ,  \°i\3
                                    ">£
                   28
                   46
                                            BAG  SAMPLE

                                            Component Code
                   64
Card 2   |_2 | A  Duplicate columns 3 through 10  from Card 1
          1
                        ppmv
                   14
6.
                   32
                   50
                                                             37
                                                             55
                                                             73
                                                             23
                                                             41
                                                             59
                                                                   ppmw
                                                                                     7
Remarks:
                                      102

-------
                 1 I A
                                  ANALYSIS  DATA SHEET
                                   (AMBIENT AND BAG)
1.  Radian Valve/Pump ID*  O \^\ V | A
                                                    2.  Unit/Process
                                            Cok.  PI
3.  Plant  Name
              'VxQjQU-bUc
           Mo.   Day   Yr.
4.  Date
ha
.\
iorsio
           11
 6.  Time (Military)    (  |S| j
 9.  Instrument
                                            5.  Analyst's Initials

                                            7.  N.B. #
 AMBIENT AIR
 Component  Code
pprow
                                           BAG SAMPLE
                                           Component Code
1.
(A
i°
fa


25
2.
\ \


43
3.
\ \
61
Card 2
Component
4.
5.
6.




2 i A
1
Code

\ \
11
i 1
29
inn

Di
1 1 i ~~)l c^ f^
I | 1 of-\ ^> \ O
28
1 1 1


46
1 1 1 1

64
iplicate columns 3
ppmw
1 1 1


14
1 1 1


32
1 1 \lr2lOlG
Z5o,o
through 10 i
Comi


^ | 4 1 ^
34
1 1 J
52
1 1

70
:rom_ Card 1
?onent Code

- 1 1
20
1 1
38
^iVl^

iOi ^ikm o
37
1 1 1 1
55
1 1 1 1
73'
ppmw
1 1 1 1
23
1 1 1 1
41
\ lOlOlOiO 1
     47
Remarks:
                  50
                       56
59
                                      103

-------
 1.  Radian Valve/Pump  ID#
3.  Plant
  .   Date
                           C
               .    D
            Mo.   Day   Yr.
                  ( |0
            11
                                   ANALYSIS  DATA SHEET
                                     (AMBIENT AND BAG)
 6.   Time  (Military)
9.  Instrumen
              trJT
z_
24
                                                      2.  Unit/Process
                                 (  ^ K 0   T  \ "> f\ T~
                                 ^—^ [v*~  I   I '"MX \
       5.  Analyst's Initials

       7.  N.B. #
 AMBIENT AIR
 Component Code
                         ppmw
                    28
                    46
      BAG SAMPLE
      Component Code
                   64
Card 2     2 j A | Duplicate columns  3  through  10  from Card 1
          1
                         ppmw
                   14
6.
                   32
                   50
Remarks:
                                          104

-------
                                 ANALYSIS DATA SHEET
                                  (AMBIENT AND BAG)
1.   Radian Valve/Pump IDf   |(TQ|v U lAl API I 31  2.   Unit/Process Co k?
3.  Plant Name
                      > 1 V? 1 V C
4.   Date
           Mo.   Day  Yr.
                                           5.  Analyst's  Initials   C_| ^3]
                                                                   17
6.   Time (Military)    (
                     20
 7.   N.B.  #
                                                              8.  Page
9.   Instrument
                U
                              jacn
                                     24
AMBIENT AIR
Component Code
                       ppmv
BAG SAMPLE
Component Code
Card 2     2  A   Duplicate columns 3 through 10 from Card 1
5.
6.
                                                              L2I4I3I
                                                                 ppmw
     47
Remarks:
                                     105

-------
                                   ANALYSIS DATA SHEET
                                    (AMBIENT AND BAG)
 1.  Radian Valve/Pump ID#
 3.  Plant Name
                                    I A | QQf7|3>  2.  Unit/Process,
4.  Date
            Mo.   Day   Yr.
            11
                        210
6.   Time (Military)   _]

9.   Instrument
                      20
5.  Analyst's Initials

7.  N.B. #
                                                                      17
                                                                 8.  Page
                                AC
                                       24
 AMBIENT AIR
 Component Code
                         ppmv
                                            BAG SAMPLE
                                            Component Code
                 Duplicate columns 3 through 10 from Card 1
                                                               37
                                                               55
                                                               73
                                                                     ppmw
                                                               23
                                                               41
                  50
                                                 56
                                                              59
Remarks:
                                         106

-------
                                  ANALYSIS DATA SHEET
                                   (AMBIENT AND BAG)
                 1
1.   Radian Valve/Pump ID#

3.   Plant  Name
                                  V
                        I A |C) It  E2JTI   2.  Unit/ProcessCo k_£_  T I O-'vOt
                KJlfiUlhU
                3
                C
            Mo.    Day   Yr.
4.  Date
10-  III
           11
                                             5.   Analyst's Initials   C| 'S
6.  Time (Military)    \
                                             7.   N.B.
                      20
9 .  Ins trument  U.<7m
              1.
                    iyc
                 0
                                     •JT
 AMBIENT AIR
 Component Code
                        pprnw
                                 BAG  SAMPLE
                                 Component Code
                 Duplicate columns 3 through 10 from Card  1
1 1 15-1 f
?IO
                                                             37
                                                             55
                                                             73
                                                                   ppmw
                                                             23
                                                             41
                                                             59
                                                                          QlQ
Remarks:
                                      107

-------
1.  Radian Valve/Pump ID#
                                   ANALYSIS DATA SHEET
                                     (AMBIENT AND BAG)
              |Q| ll^l 1 I   2.  Unit/Process Q I
-------
 1.  Radian Valve/Pump  ID#
                                    ANALYSIS  DATA SHEET
                                     (AMBIENT AND BAG)
                                                      2.  Unit/Process
3.   Plant Name
                           r.
Mo . Day Yr .
4. Date \l,3 \ 1
11
6. Time (Military)
9. Instrument Jy\\f
0
V 5s! 0

1 IUI

310
5. Analyst's Initials CL|C
17
[^

7. N.B. # 8. Page #
™ 30 1 (L TWCTil


24

AMBIENT AIR
Component  Code
                         ppmw
BAG SAMPLE
Component Code
                                                                37
                                                                55
                                                                73
                                                               23
                                                               41
                                                                      ppmw

I 171
OlOlO
                                                               59
Remarks:
                                         109

-------
                                    ANALYSIS  DATA SHEET
                                     (AMBIENT AND BAG)
1.  Radian Valve/Pump ID#

3.  Plant Name 4\(LpL)lipU
                                  v lA |Q|
                                                       2.  Unit/Process
                             3
                            (L-
 4.   Date
            Mo.    Day   Tr.
            11

 6.   Time (Military)
9.   Instrument
                \~\ 9
                                              5.  Analyst's Initials
                                              7.  N.B.
 AMBIENT AIR
 Component  Code
                         ppmw
                                             BAG SAMPLE
                                             Component Code
                                                                    ppmw
1.
2.
3.
Card
Compc
4.
5.
6.
All I^L
25
1 1
43
1 1
61
2
snent


2 |A
1
Code

1 1
11
1 1
29
1 1

Dt


i i^i^n
28


i i i
46


i i i
64
iplicate columns 3
ppmw
_J

i i i
14

32


i i i

! 1 1 I !
through 10 i
Coraf


o\ ta
34
1 1
52
| |

70
:rom Card 1
jonent Code

1 1
20
1 1
38
1 1

I KolSiO (a
37
L L L 1
55
1 1 1
73
ppmw
1 1 1
23
1 1 I 1
41
1 II"
     47
                   50
                                                 56
59
Remarks:
                                        110

-------
                                   ANALYSIS DATA SHEET
                                     (AMBIENT AND BAG)
                  1
 1.  Radian Valve/Pump ID#
                    \Q\
                                                      2.   Unit/Process
                         G
 3.  Plant Name*
            Mo.   Dav   Yr.
 4.  Date
           \
\\
           11
6.   Time  (Military)     [ | O\ \
                      20
             V
9.   Instrumentpu (71
5.  Analyst's Initials

7.  N.B. #
                               TMT   (T)
                                       24
 AMBIENT AIR
 Component Code
                         ppmu
                          BAG SAMPLE
                          Component Code
                 Duplicate columns 3 through 10  from Card  1
KL5'IO
. |5
                                                                37
                                                                55
                                                                73
                                                                      ppmw
                                                               23
                                                               41
                   50
                                                 56
                                                               59
Remarks:
                                        111

-------
                                  ANALYSIS DATA SHEET


                                    (AMBIENT AND BAG)
 1.  Radian Valve/Pump ID#
                                            I o^l 3   2.  Unit/Process,
 3.  Plant Name
             r\?jT7U\Q\i,
Mo
              .   D
 4.  Date
           11
                   ay   Y'r.
                       50
6.   Time (Military)
 9.   Instrument
              UP
                                 5.  Analyst's Initials
                                             7.  N.B.  #
                                      24
 AMBIENT AIR


 Component Code
                        ppmw
                                BAG SAMPLE


                                Component Code
                                                                  ppmw
                              .  it
                   23
                                     2.0=1. "2.
                                                                      I3J,
                                                             37
                   46
                                                             55
6.
                  64


                Duplicate columns  3  through 10 from Card 1


                        ppmw               Component Code


                    i   i   i   i  T~
                  14


                    I   I   I   I ~
                  32


                    i   i   i   i T"
                  50
                                                              73
                                                                   ppmw
                                                              23
                                                             41
                                                              59
Remarks:
                                       112

-------
                                   ANALYSIS DATA SHEET
                                    (AMBIENT AND BAG)
1.  Radian Valve/Pump ID*  \C\ \ &H V I A \G I  I Q>4
                                                      2.  Unit/Process
3.   Plant Name |y 0 QU bl iV    S4&0
            Mo.    Day   Yr;
4. Date
ll^-lll %£>
11
6. Time (Military) | |^-|<5|6
5. Analyst's Initials Osbl^
17
7. N.B. # 8. Page #
20
9. InstrumentT)^ COYl oOl A- iW~\ I |

6 24

AMBIENT AIR
Component Code
                                             BAG SAMPLE
                                             Component Code
1.
2.
3.
Card
Compc
4.
5.
6.
^ih i^
25
1 1
43
1 1
61
2
ment



2 j A
1
Code

1 1
11
1 1
29
If
Ml



Di
|
28
1 \|\

1 1 1 1
1


46
1 1 1 1

64
iplicate columns 3
ppmv
1
1 1 1
14
1 1 1 1

32
|
1 I^IOIO
V\4
through 10 i
Comj



°[tf 1?
34 '
1 1
52
1 1

70
from Card 1
jonent Code

1 1
20
1 1
38
^fSi?

ii m i lOio
37
1 1 1 1
55
1 1
73
ppmw
1 1
23
1 1 1
41
i4l5lOiOiO
     47
                                                               59
Remarks:
                       /\
                                           113

-------
                                   ANALYSIS DATA SHEET
                                    (AMBIENT AND BAG)
                 1
1.  Radian Valve/Pump ID#
3.  Plant Name
                             2.  Unit/Process
\
Mo . Day Yr .
4. Date \ I 
-------
                                    ANALYSIS  DATA SHEET
                                     (AMBIENT AND BAG)
 1.   Radian  Valve/Pump  ID//
                                                      2.  Unit/Process63
                             •^

 3.   Plant Name  ^NJLpU,b U C,   S \££ (
 4.   Date
            Mo.   Day  Yr.
                  III
            11
 5.  Analyst's Initials
                       20
6.  Time (Military)    \ \  Lp\Q\0
             a
                                               7-   N.B.
                          17
                     8.  Page #_
 9.   Instrument
                 C3
                                        24
AMBIENT AIR
Component Code
                          pprow
BAG SAMPLE
Component Code
                                                               37
                                                               55
                                                               73
                                                                     ppnw
                                                               23
                                                               41
                   50
                                                 56
                                                               59
Remarks:
                                         115

-------
                                   ANALYSIS DATA SHEET
                                    (AMBIENT AND BAG)
1.  Radian Valve/Pump ID#    Q|^| V | A \Q\ I Pel 31  2.  Unit/Process
3.  Plant Name
            Mo.   Day   Yr.
4.  Date
           11

 6.  Time  (Military)
 9.
                     5.  Analyst's Initials
                     7.  N.B. #
                          17
                     8.  Page
 AMBIENT AIR
 Component Code
ppmw
BAG SAMPLE
Component Code
                 Duplicate columns 3 through 10 from Card 1
                                                               37
                                                               55
                                                               73
                                                 56
                                                               23
                                                               41
                                      59
                                                                     ppmw
                                                                                  4-14,1
Remarks:
                                        116

-------
                                   ANALYSIS DATA SHEET
                                    (AMBIENT AND BAG)
 1.  Radian Valve/Pump ID#
3.   Plant Name1v(LOU     t
v I A |Q| /
                                                     2.  Unit/Proces
Ca\
-------
                                   ANALYSIS DATA SHEET
                                     (AMBIENT ANT) BAG)
1.  Radian Valve/Pump ID#
3.  Plant
4.  Date
^|^IV|A|Q|) .\Z\°\
                            /\
         2.  Unit/Process
            Mo .   Day   Yr .
            11
 6.  Time  (Military)   \  [[
 5.  Analyst's Initials

 7-  N.B. #
 9.   Ins trumentJA£_5750
                                       24
 AMBIENT  AIR
 Component Code
BAG SAMPLE
Component Code
Card 2     2  | A  Duplicate columns 3 through 10 from Card 1
                                                               37
                                                               55
                                                                73
                                                               23
                                                               41
                   50
    56
                                  59
                                                                              n
1
1 1 1
Remarks:
                                         118

-------
                                                                     ,
                                                                /
                                                                 CO
          a // j f  j / / • «.
         A
                   74,5
                     .2 , -7
V*T
                              
-------
                                      7.
         /-LL\
         (
 '   3
   o

    3
U>
                   23
                        .  x
               f  -..
                           //v r. s^^^y -^>   ^^e  —  a 7z
                //f  ( /.2^J? /AJ ^-7^* }  ^>   T^
-------
         REPUBLIC STEEL
          GADSDEN PLANT
B-5  OVA and TLV Calibration Data
               121

-------
                                                                       l/MIT
                                 CALIBRATION CHECKING FORM
NJ
1
.u
a
0
/|3
, ,.a
ip.
'I2-
1 |i
1 |3k
l|2
) |2
1
|
1
id
^t
QL %
C' | C'
? | 0
t |O
1 I1
'l'
I |Z
1 p
1
1
1
Instrument
k
%
'a,
^
>
A
'3
4



>
Screening
Team
f)
C,
0
,
"X
\
0|1
o
o
0
o



I
/
I
1



Low standard
ppm calibration
nv
1 1
1 1
1 1
1 1 1
1 1
1 1
1 1 1 1 1
1 1 1 1 1
1 1
1 1
1 1
1 1
1 1
1 1
5\v |0
1 1
1 1
1 1
1 1
1 1
High standard
	 ppm calibration
1 1-iU-U-^
1 1 Ik 15 |o
i ni5ioio
1 1 l|8|0|0
\\\o\p
oil
\ \^\°\o\p
\\-\u\o
\ 1 2 | o
III.
1 1 1
1 1 1
0| 1
ojo
I
|
1
Dilution Probe
Calibration
?n
1 1 1 1 1
1 1 -I" M^'lO
1 1 1 1 1 1 &|o
1 1 1 1 1
i i nioio
i i i i i
i i i i i
i i i i i
i i i i i
i -i i i i
i i i i i
                                                                                   2.




                                                                                   Z
                                                                                   7





                                                                                   7.
         Comment B :

-------
          REPUBLIC STEEL
           GADSDEN PLANT
B-6  Dry Gas Meter Calibration Data
               123

-------
RADIAN
       Card 1
                              SAMPLE DATA SHEET
1.  Radian Valve/Pump ID#    \  \  1   1  I   I  I  i  2.  Unit/Process
3.  Plant Name
           Mo.  Day  Yr.
4.  Date
6.  Time
           20
     (Military Time)
10.  Meter #1  l7fST7l- l^-l Q
               ^5
5.  Sampler's Initials
                                                              1 7
7.  Cart ID#
                8.  N.B.#
12.  Meter #2  I 7\ «£|5l  1^1 / I
               31
                                9.  Page #
11.  Time #1
               37
13.   Time #2
14.  Temp #1 °F
                 "15
15.   Temp #2 °F  I  \C\3\
16.  Bar. Press., in. Hg.
                          5 1
 17.   AP,  in.  Hg.
                                                              56
                               -I2-
18.  DGM Correction,
     Factor

20.  Vol. Org.
     Condensate ml  6S
19.   Meter #
                  '/
21.  Coll. time, minutes
22.   Specific Gravity
     of Organic
     Condensate
                                                             75
23.  Comment
              78
                                   124

-------
       Card 1
                   s]
                              SAMPLE DATA SHEET
1.  Radian Valve/Pump ID#   I   I  I   I  I  I   I  I  2.  Unit/Process
                           3
3.  Plant Name
           Mo.  Day  Yr.
4.  Date
6 .   Time
           I \Z\t\LW0\
                                      5.   Sampler's Initials
                                                              1 7
    (Military Time)
10.  Meter #1
               25
11.  Time #1  I   I
               37
14.  Temp #1 °F
7.   Cart ID#



  12.   Meter #2


  13.   Time #2


  15.   Temp #2 °F
                                                      8.   N.B.#
9.   Page #
                          51
16.   Bar. Press., in. He. \3O\' \2\(\ 17.  AP, in. Hg.


                                      19.  Meter #
1 I£L
|Z
                                                              56
18.  DGM Correction,
                      i,u9iSi£
     Factor
20.  Vol. Org.
     Condensate ml
                    61
                    66
21.  Coll. time, minutes
                                      22.  Specific Gravity
                                           of Organic
                                           Condensate
                                                              75
23.  Comment
               78
                                    125

-------
     REPUBLIC STEEL
      GADSDEN PLANT
B-7  Accuracy Check Data
         126

-------
RADIAN
       Card 1
                              SAMPLE DATA SHEET
1.
                1          O Z A C o  a a \
    Radian Valve/Pump ID# \A\C\f l£ 101? iff & JC2.
             Unit/Process
3.  Plant Name
           Mo.  Day  Yr.
4.  Date
6.   Time
           11
                                      5.   Sampler's Initials  I ffiL*^
           20
    (Military Time)
                                    7-   Cart ID# \T\   8.   N.B.# 	  9.   Page  #
                                                 2V            	
10.  Meter #1
11.  Time #1
               25
                                      12.   Meter #2 \S\Q\Z\. \7 \f\
               37
                               'f
14.  Temp #1 °F
16.   Bar. Press., in. Hg.
                                • I l\8
                          5 I
                    /\ •
                    6 1
18.  DGM Correction.
     Factor

20.  Vol. Org.
     Condensate ml
21.  Coll. time, minutes
13.  Time #2


15.  Temp #2 °F I
                 i

 17.   AP, in.  Hg.


19.  Meter #
                                                                           28.5s
                                                               I/I
                                                              56
                                      22.   Specific Gravity
                                           of Organic
                                           Condensate
                                                             75
23.   Comment
              78
                                                              /I
                                                                       4.
                                                                     "
                                     127

-------
        Card 1
                               SAMPLE DATA SHEET
                 1          C "2- A C  o o o Z
 1.  Radian Valve/Pump ID#

                                             j/ 2.  Unit/Process
 3.  Plant Name
            Mo.  Day  Yr.
 4.  Date
 6 .   Time
            11
                                      5.   Sampler's Initials jx* l^J
                                                                1 7
            20
     (Military Time)
                                    7.   Cart ID# \T   8.  N.B.# 	  9.  Page #
                                                 Tnrf             '^^^'^^
10.   Meter #1
 11.  Time #1
 14.  Temp #1 °F
                25
                                       12.  Meter #2
                                      13.  Time #2
                                      15.  Temp #2
                                                        1+8
 16.  Bar. Press., in. Hg.
 18.  DGM Correction.
      Factor
 20.  Vol. Org.
      Condensate ml  6 6
. 21.  Coll. time, minutes'
 23.  Comment
                                       17-  AP, in.  Hg.
                                      19.   Meter #
                                                               56
                            I  I  I   I   22.   Specific Gravity  L  I   I
                                            of Organic
                                            Condensate
                                                               75
               78
            ,
          1,05
          1,05
                                        128
                                                       f/

-------
                                  ANALYSIS DATA SHEET
                                   (AMBIENT AND BAG)
                                  A o  o  o  c
1.  Radian Valve/Pump  ID#
3.  Plant Name
4.  Date
6.  Time (Military)
                                                  r ,\s  ~P\   'i
                                  2.  Unit/Process ^ O  &c
                         17
                    8.  Page #
 AMBIENT AIR
 Component Code
      ppmv
BAG SAMPLE
Component  Code
                                               ppmw
                                                             37
                                                             55
                                                             73
                                                             23
                                                            41
                                                            59
                                                                  ppmj
Remarks:
                                      129
                               - 3. $17
                             //< 7Z %

-------
                                   ANALYSIS DATA SHEET
                                     (AMBIENT AND BAG)
                             O -2. A e,  oo  02.
                                          X-S  .•—•l  A   I
1.  Radian Valve/Pump ID#
3.  Plant Na
4.  Date
6.  Time  (Military)
 9.  Instrument
                                                       2.   Unit/Process C_jb K  1 T  I^
                                              5.  Analyst's Initials    Qo I 6?!
 AMBIENT  AIR
 Component Code
                         ppmv
BAG SAMPLE
Component Code
           2  | A | Duplicate columns 3  through  10  from Card 1
                                        130
                                                  56
                                                                37
                                                                73
                                                                23
                                                                41
                                                               59
                                                                     ppmw
                                                                          -   *5
                                                                      ppmw
Remarks:

-------
                                   ANALYSIS DATA SHEET
                                    (AMBIENT ASP BAG)
                 1
1.  Radian Valve/Pump ID#
                              fiU KID
4.  Date     ._ .
             . 2.  /O
6.  Time (Military)
9.  Instrument
2.   Unit/Process
                                                                               T lOLK\JC~
                                              5.   Analyst's Initials   Q3~| O
                                                                       17
                                              7.   N.B.
            8.   Page #_
AMBIENT AIR
Component Code
                                             BAG SAMPLE
                                             Component Code
1. l^^p^^"

1 1
1
25 28
2. I

| |
1
43 46
3. 1
61

1 1
!
64
Card 2 1 2 j A Duplicate columns 3
1
Component Code

4. |
ppmv

1 1
1
11 14
5. 1

29 32
6. |

1 1

1 1
i

I
47 50
through 10 i
Corai

131
6ll 12.
34
| |
52
I i

70
:rom Card 1
jonent Code

1 1
20
1 1
38
1 1
56

/\O\4*\2-\ - \3?
37
1
1 I

55
|.
73
|
LJ
1


pptnw

|

23
1 1
41
1


|

|





59
Remarks: &<£_. jyy* — *.•> r- a /v,^^
                                                                                          X

-------
                                                                                   #•2,
1.   Radian Valve/Pump ID#
3.  Plant
                                 ANALYSIS DATA SHEET
                                   (AMBIENT AND BAG)

                              BLlHD    S
                                 V | A
                            2.   Unit/Process
            Mo.   Day
4. Date
\\~2~
11
oi
-------