EPA-R2-73-U8b
January 1973 Environmental Protection Technology Series
A Process Cost Estimate
for Limestone Slurry Scrubbing
of Flue Gas
Part II - Detailed Estimate Sheets
Office of Research and Monitoring
U.S. Environmental Protection Agency
Washington, D.C. 20460
-------
EPA-R2-73-148b
A Process Cost Estimate
for Limestone Slurry
Scrubbing of Flue Gas
Part II - Detailed Estimate Sheets
by
E. L. Calvin
Catalytic, Inc.
1515 Mockingbird Lane
Charlotte, N. C. 28209
Contract No. 68-02-0241
Task No. 11
Program Element No. 1A2013
Project Officer: J. S. McSorley
Control Systems Laboratory
National.Environmental Research Center
Research Triangle Park, North Carolina 27711
Prepared for
OFFICE OF RESEARCH AND MONITORING
U.S. ENVIRONMENTAL PROTECTION AGENCY
WASHINGTON, D. C. 20460
January 1973
-------
SUMMARY
A conceptual design and cost estimate have been prepared for
a wet limestone scrubbing system to operate in conjunction with
the 500 mw steam boiler plant fired with coal that has a concen-
tration of 3.5 per cent sulfur. The wet limestone process is
based upon data developed by TVA, Office of Agricultural and
Chemical Development in the Muscle Shoals Pilot Plant. The de-
sign and cost estimate is for installation with a new boiler plant;
however, the installation for "retrofit" on an existing boiler
plant of similar size would be identical except for the capacity
of induced draft fans.
The capital cost for the plant was estimated to be $20.15 mil-
lion or an incremental cost of $40.30 per kilowatt of installed
power. This capital cost estimate is based upon quotations for
the majority of the equipment and construction labor estimated at
the 1973 level of midwest labor rates. The plant design was per-
formed in sufficient detail to provide take-offs for piping and
other mechanical hardware to provide an accurate basis for the
price quotations. Detailed estimate sheets are included as
Part 2 of the report. Part I of the report gives details of the
design and a summary of capital and operating cost.
Operating cost of the wet limestone scrubbing system was
estimated to be $7.2 million per year, or 2.06 mills per kilo-
watt hour of electricity generated. This operating cost was
calculated using typical unit prices for raw materials and
labor and factors derived from conceptual design. Operating
costs will vary in different locations from differences in
raw material costs, utility costs, and labor rates.
Ill
-------
15018-27IP
SUMMARY SHEET
ESTIMATE/JOB. NO
CUSTOMER
LOCATION .
6>%~01'024-l} DATE
I
MTERIAL
loo
SUBCONTRACTS AND SHOP LABOR
too
M.L RISK INSURANCE, LEML LIABILITY, ETC./ปZS
SPECIAL TAXES. (Salts. Use. ttc. )
TTC7.+ป
^f.%*
r*
Joa.
M/tri.
i
f
ooo
TOTAL MATERIAL, SUBCONTRACTS t SHOP LABOR
coo
FIELD LABOR
>^JsฃiL^ฃ5if!^B_^_i^^____^bm^ff^*i
PAYROLL BURDEN J/.7- /A
OOQ
TOTAL FIELD LABOR
OdO
FIELD SUPERVISION
FIELD OFFICE PERSONNEL
FIELD OFFICE EXPENSE
A *
FIELD COST ANALYSIS
ฃ_ฃ
UKDCM.
START-UP OPERATORS
CONSTRUCTION EQUIPMENT AND TOOLS /2'2 * L/)aog &>
TOTAL OTHER FIELD CHARGES
MECHANICAL ENGINEERING
i^
PROCESS ENGINEERING
ESTIMATING AND COST ANALYSIS
gfrฃ
HOME OFFICE TRAVEL EXPENSE
t^B-ToT/l
PURCHASING. EXPEDITING AND SHOP INSPECTION
ACCOUNTING. INDUSTRIAL REL.. GEN. ADM, t CONSTRUCTION
TOTAL HOME OFFICE EXPENSES
000
SUB-TOTAL
n
000
HEAD
ฑ
TOTAL CHARGES
CONTINGENCIES
ooo
ESCALATION
GRAND TOTAL
20
I5o
ooo
RFUARKS
-------
MATERIAL
SHEET
ESTIMATE HO.
CUSTOMER
II -EPA
PAGE
OF
PROTSCTHM
LOCATION
CODE
DESCRIPTION
SIZE
MATERIAL
LABOR
SUBCONTRACT
1
2
3
4
S
6
7
a
9
10
11
12
13
14
IS
18
17
IB
19
20
21
22
23
24
25
28
27
28
29
30
31
32
33
34
35
38
37
7 T
OOQ
ULL
AG
2 & /Q-X x
rry 7^nt<;;
Z5
TOTAL MATERIAL, LABOR AND SUBCONTRACT
f 75" ooo
J F
-------
,ฉ21-27(1
S
I
C3 M A R Y
USTOQEB
LOCATION
an.
COPE
DESCRIPTION
0100
FIRED HEQTERS
0200
BEflCTBRS Qt3B IMTEEilMS
0500
TODERS
HEflT
C06LONG
8353
VESSELS. TOaKS. OBUOS ft IjlTEBOflLX
PUI3W flHD OH!WEBS
QOO
i tOC
JlfiO
OtSCELLflllEOl'S DEEKIflttiEfli EQUITOY
!<&%งy?0|ฃL
zsoo
TflMflflGE
2BOO
FUTEBS.
. EQUIKIEHT
3000
JlPO
SCRUBBERS & EBTBfllCDEOT SEMROTORS
10015 &
EBIHCTOT
J400
. SB ITS
im
&W3
1300
14CC-
1500
1600
CBDCRtTC
JTMCTM8flL STEEL
JUULPlKlOKIEtJT
LlflL
2400
MICJTIHE ฃ P89TECTIWE GOATItlGS
FIELD FESTIME
7700
CMEDJCflLS OP9 CflTQtVST
QISCEUflBEBUg BIRECT
CBC3SYRUCTI0C3 SU^ilES S
TESTIHC OELBERSf^
-------
021-271
SUB-SUMMARY
CUSTOMER
- LOCATION
, CODE
OiOO
. 0200
0400
0500
0600
0700
0800
0900
* '000
1 : 0?
'233
- 25CJ
:sco
?90Q
. 3000
3100
3200
ซ
' 400
-m
1300
1400
, I5CO
1630
1700
1BOO
1900
:PDD
lias
- JMO
1300
Z400
- 2603
2700
3300
_ 3500
3700
~ 3800
^00
JOO
T300 I60G
JbV
2100
ฃOv/lfcoOnAejJTAL PROTetTiOKj AGOX_V ESTIMATE uo.4/?^ (]l'X Mo. // )
Dv]RUA*A ,fOoRn! cAdOLioA
DESCRIPTION
FIRED HEATERS AND BOILERS
STACKS
REACTORS AND INTERNALS
TOWERS AND INTERNALS
HEAT EXCHANGE EQUIPMENT
COOLING TONERS
VESSELS. TANKS. DRUMS & INTERNALS
PUMPS AND DRIVERS (1}
BLOWERS AND COMPRESSORS
ELEVATORS. CONVFYORS. MATERIALS HANDLING EQUIP. (2
MISCELLANEOUS MECHANICAL EQUIPMENT
TANKAGE (/)
FILTERS. CENTRIFUGES. SEP. FOUIPMENT
AGITATORS AND MIXERS
oCfcuaeens & ENT^AINMENT SEPARATORS
MACHItit ;OJLS & MACHINE SHOP EQUIPMENT
HEATING. VENTILATION. AIR CONDITIONING.
3UST CONTR1L (Process only)
pACMCi uirns
SUB-TO, At - MAJOR EQUIPMENT
PIPING
SEWERS
INSTRUMENTATION
ELฃCTR!CAL
CONCiii'F. 2*3 0V
STRUCTURAL STEEL
F1REPROOFING
BUiLDINGS
S',TE DEVELOPMENT
INSULATION
PAIKTINC 6 PROTECTIVE COATINGS
FIELD TESTING
CHEMICALS AND CATALYST
PILING
FIRE PROTECTION
MISCELLANEOUS FURNITURE FOR PLANT BUILDINGS
SUB-TOTAL
MISCELLANEOUS DIRECT CHARGES
STOREHOUSE ACCOUNTS
CONSTRUCTION SUPPLIES & PETTY TOOLS
TESTING WELDERS
TEMPORARY PIPING & ELECTR CAL FACILITIES
TEMPORARY CONSTRUCT! II BU LDINGS
TEMPORARY SITE DEVELOPMENT
TOTAL DIRECT COSTS
MATERIAL
fฃ"0
jTGfoo
sips-o
zoo
Zฃ~OO
?*4oo
30
,
7OO
/o
74,890
nปif
PIISF OF
LABOR
3*0
/J~tooo
/^320
(rOO
ฃttoo
39.200
J 40
*
3.2^,0
1 30
<2><2ป,550
SUBCONTRACT
7fc,OCO
7^000
76,000
-------
CC1
ESTIMATE DETAIL SHEET
ESTIMATE/JOB NO
,4<
CC2-I
SZQUEiSTHll
CC1MI
CODE
9
AREA-Hd
10
DATE
CC75
ITEM CEC:*!??ป0!I
itM^4
C9C
23-4S
l!NE DESCS1PTK5H
PIUWIP
WRITE
FIXED
TTPE
QUANTITY
46-74
J *>,
80
17--2
23-3-2
VisiT
AJ
T 1
A
ri>
i
i i
TOMIHE
;
F!
14-
TTT
Mteซtซ9ia
nfcJNTlOrf
i
71 0| 3
aui
T"T
8 01 1
S
Ar
SO
1
?! 7i C '
M
-M-
T
-Mr,
ฅt
ceoe C900
AM) DRIVERS
cr;.:-T
09oo G^odP
1
-------
*1
ESTIMATE/JOB NO. -
SEMUTUL 1 CC1MI
**** -lol-.Li.Mii I
ma
ป. ป .
TOTAL coKix^vot?.
VAJl
OfM of S6L-T
L^Kl^TW Of^ CQOuerfoR
SP6D
ฃ.APACi"T"V
rA0TO&. i4cฃS'ฃ P0uJ6K.
SUB TOTAL - 1101
FOUNDATIONS
FT6S & PIERS
SMALL SUFERSTRHCTIIES
SUPPORT SBPttSTIlfTBHl
PLATFOW I LAOtCtS
FIIENMFINfi- TYPf THE
Fl REPROOFING: TYK. TNI
INSULATION - ALUM
PAINTING - ALLOW
PAINTING - ALLOW
5diPP6o PK.Oป^
rtfi
lv*JA\\Kf- \Jiscn tJ^if^
y
V^KlOO R, 'SU P6RAJ I S I G f^
t*IIMAIt UfclAIL dHfcfcl
CC2-0
> 4\l\^\4^0
CODE-*
7
1
0
i
AREA-*
J1.1
*Ai
ITEM BCSCNIPTWH
17-22 1 2341
17-2]
1
1
2
2
2
7
7
7
9
8
9
9
2
3
3
0
1
1
0
0
0
0
0
0
0
8
0
2
1
3
Jk
A
B
B
C
C
9
B
*
A
*
A
*
A
9
t
/
<
WIITE IN
23-30
^
/
|
';
ฃ
^
i
F
rt
H
T
X
^
Sft
(J
T
ฃ
^
0
<ฃ
N
/5
L
fi
_
A
f/
$
t.
2.
^
T
o
ฃ
5
-
2
6
2
9
ซJ
p
L
&
^>
^
4
<9
O
M
O
.
^
t
f
Q
.
-
.
L
I
P
ffl
p
0
/
L
^
^
u
ฃ
i
\
u
/I
^
H
ฃ
>
3
7
ฃ
f
3
W7
/
P
p
p
$
f
5
s
>
^
^
TYK
NT
UNR
UNR
UNR
CY
CY
CY
.B
.B
SF
CF
SF
TON
SF
30-40
^
^
-
a
-..
-
c
c
y
y
f
DATE
41-74
MATFlHAi
54 M
I * J * i .' .
5
ซ
Mi
5,
3
ป
M
f
f
2
?
r
ป,
/
ft
|_|
e.
o
Q
M
**
0
^
0
0
o
ป
*
c
p
i i
W.',
y///.'.
ffl
40
f
-
^
gjiiii
S4-M
^
ซ
M
ป
>
^m
M*
ซ
^ .
> *
.
ป -,
0 .
c- -
MM
MM
ซ
MM
-*
MM
^
ป
Ml
CC75
1
<
Jh-
I
i
k
*
10-74
1
/
^y
'
7
^
MM
V
/
'
Q
$
9
*
m
7
i ' """" *
^
O
c
9
a
o
p
o
Mซ
0
M^
%%^^^
COM: 1100 0ESI8NATIM: ELEVATORS. CONVEYORS, NATERIALS HANDLING EQUIP. 7 t SNCH / OF -t_l
i 00 r
-------
ESTIMATE/JCS MO.
raao
CCM>
DBTAIl
8ESC3TOACT
uocq
17-22
23-30
C31T
90*40
94-00
43
54-C3
00-7
TOTAL
4
a
K)6
6A
S
W
fl.a
rฃu
12.
ฃJQ
H
eฃ
UUR
SUB TOTAL - 1101
FouasATieis
ct
FTBS & PIEflS
CY
SHALL SUPEDSTtOTtSES
CY
SUPPMT
PUTFBSg & LACaOt
LD
IT
JOK
TTFi. TIM
CF
-HLP
SF
TS"
PAIUTinfi - ALLC3
IT
PAIHTIIJ6 - HIP
O-IQl
COOC: 11QQ
OESIQOATtOa: ELEVATORS. COHUYORS, DATERIALS HAODLIHG EQUIP.
OF<*Z
(100
-------
CC1
ESTIMATE/JOB NO. -t
SEQUENTIAL
PIECE*
CG1MO
V -i.03
FIXED
ป. *~ .-
CAPACITY
WEIGHT
DESIGN: OF,
PSIG
SHELL: DIAHETER
LENGTH T TO T
THICRNESS
PL SPEC
HEADS: NO..
TYPE
THICRNESS
SUB TOTAL - 2501
SLABS & PEDESTALS
SADDLES FOR HORIZ. TRS.
CONC. TANK RINGS
SUPPT. SUPERSTRUCTURES
PLATFORBS & LADDERS
FIREPROOFING: TYPE. THR
INSULATION: TYPE. THR
COVER
PAINTING-STRUCT
PAINTING-TANK
. STL.
i&duumAui& OBIAIIIL ง>ini[ฃiฃii
CC2-0
ป 4] 1 1*^1 4-
o
CODE-ts
7
2
1
5
AREA-c
0 1
= 0
0
/
ITEB DESCRIPTION
17-22
2
5
0
*
#
23-43
L
|
M|l
i.siTlo|*j
6
S
ป Tte
HUE DESCRIPTION
17-22
1
1
1
1
1
1
2
2
2
2
7
7
8
8
9
2
2
3
3
0
1
3
0
0
0
0
0
0
0
b
5
6
1
3
A
B
B
B
B
B
B
B
B
9
B
*
*
A
B
C
0
t
F
G
9
*
*
*
*
*
*
*
A
*
*
Y////////////M^^^^
TSTAL
CODE: 2500
WRITE IN
23-30
T
i^
h
s
0
%
7
7
O
to
p
^2$$
N
I
%
ft
%
d
{i
,
0
ft
-
0
Z
N
ft
%
^
/v
5"
ฃ
_
r
- F
tl
r
f-
"
f^
ft
^
L
,<;
-9
^
o
ซ
^
jM
r1
i
A/
'
; -
Af
^
ft
8
R
7;
L?
fft
5
C
.ป
/
tf
^
f
fa
ti
O
i
"
ft
^
^lli
FIXED
TYPE
UNIT
tJG
LB
CY
CY
CY
LB
LB
SF
SF
TON
SF
w<\
w//t
4L
QUANTITY
30-49
rl
fa
h
f
fa
ft
4
r
ft*
^
0
/
^
[ft
0
2
0
ft
^
c
4
0
fa
w,
DATE
40-74
QATERIAL
54-00
w
ti
O
4
~
i
^
b
A
o
HH
w
c
O
ty
4
4
^
X
^
o
s
40
V
^
#&
SUOCOOTRACT
54-00
/j
7
^n
6f
ซ
O
s>
-
PQ
-
i : ! j
! j
^
7
#
X
#
c
^^
00
-fiCTS
1 1
i
fi
J.
0<
\
k
k
LA DOR
00-74
^i
^^
^ป
/
^
O
J
/
^
^
-4
f
//,
r
*
0
%
c
o
s
$
O
DESIGNATION: TANRAGE . SHEET / OF /
-------
CC1
ESTIMATE DETAIL SHEET
ESTIMATE/JOB NO. -ซ
SEQUENTIAL
PIECE*
ecu
10
FIXER
- >. -ป
BARE PIPE: CARBON
STL
ALLOY
OTHER NATLS.
VALVES: CARBON
STL.
ALLOY
OTHER NATLS.
FLGS. FTGS: CARBON STEEL
ALLOY
OTHER
NATLS.
SPECIALTIES-TRAPS. ETC.
SPRING HANGERS
EXPANSION JOINTS
SHOP FAB'N. - VDR
CARB.
STL
ALLOY
ERECT. UNDERGROUND PIPE
N/H TON
ERECT. RACK PIPE:
CARB
. STL
N.H TON
ERECT. RACK PIPE:
ALLOY
ffjlr/TJj J
CC2-0
ป 4\l\^\4\0
CODE-*
7
1
1
3
AREA-*
1 1
G
0
/
ITEM DESCRIPTION
17-22
1
3
0
1
ซ
ซ
23-45
LINE DESCRIPTION
17-22
1
1
1
1
1
3
3
3
3
3
0
0
0
0
0
2
3
4
5
6
A
B
C
0
E
F
6
A
B
C
0
E
F
G
A
B
C
0
E
F
G
H
1
J
A
B
A
B
A
B
C
0
*
*
W/////////////////^^^
TOTAL
CORE: 1300
WRITE IN
23-31
#
%
%
%
tfwt
vXn
%
%
ft
%
tt
%
ti
%
%
"/,
#
m4\
WW
^
^
g
fa
%
FIXED
TYPE
UNIT
TON
TON
TON
TON
TON
TON
TON
NO
NO
NO
NO
NO
NO
NO
UNR
UNR
UNR
UNR
UNR
UNR
UNR
UNR
UNR
NO
TON
TON
TON
TON
NH
TON
NH
W&
ffi
DESIGNATION: PIPING
QUANTITY
3145
ฃ
i
f
JuJ
w<
w*
.
8
^
T
i
V
^
/>
DATE
41-74
ffiffifa
^gggZgggigg&gZggggggfggggglg
MATERIAL
54-10
#
#
fy
y>,
i
1
fa
0
f
C
#
0
0
a
fa
s
40
##
SURCONTRACT
54-M
fy
th
fa,
\
ty<
\
Mi
fa
fy< \
CC75 11
i
i
\
\
LAROR
01-7
Wt
$i
fa
\
fa
fa
fa
t t SHEET / OF L -ฃ.
\3oo
-------
C1
fcbMMAlt UfclAIL 5Mttl
ESTIMATE/JOB NO. -*
SEQUENTIAL
PIECE* -
CC11
-16
FIXED
.. .. -
ERECT. ALL OTHER:
CARS
. STL
HH'TON
ERECT ALL OTHER
: ALLOY
MB/TON
FLD. SHOP FAB: CARS.
KH.'TON
STL
FLD SHOP FAB: ALLOY
MH.TCN
TESTING 1ELOERS
PI
PING SKETCHES
i TEMP. PIPING
PI
PE CASTINGS
EXCAY. FOR UGRO
. PIPING
COAT & *RAP UซOGRD.
PIPING
SUB TOTAL - 1300
cc
KC.P.S. ICO',
INC. FON.
PI
FLO.
FAB.
PE BAY TREXCHES
PRECAST P.S. -
PRECAST P.S. -
PI
H
FAB'N.
ERECT
ONLY
ONLY
PE S'JPPT. RIGRID HGRS.
ซ* P.S. - PP
SMALL SHAPES -
P!
PE BICซ - P--
FIREPROOF. SIR.
EF
F!
fF
AB
FAB.
13
STL
P
.S
PiFlNG IhS'JLATi:^
FA
INTIHG :TR s
TL. SUPPT
S.
FAIHTIHG PIK
TEST!HG
v7^.
*y "*7'S'ry-r-9~.Tr my
f/SSr .// '. . ' 'f
7T^7^r
TJTJIl
**/ ' '
CC2-6
> A,
/!9
t
O
CODE->
7
1
8
3
AREA-*
9 1
ป Q
0
/
ITEM DESCRIPTION
17-22
1
30
7
tt
n
23-45
1
LINE DESCRIPTION
17-22
1
1
1
i
1
1
1
1
1
1
1
3
3
3
3
3
3
7
7
7
7
0
0
e
Q
V
1 0
3i9
4
4
1
3
3
8 0
0
1
3
8
1
2
5
1605
1
8 0{5
3 0 7
1 S 0 1
2- 2: u '
21
3
213
on
f\
U !
2(4 Oil
W?
A
B
C
0
E
F
G
H
A
9
A
A
A
A
A
*
*
*
*
*
*
ป
*
*
9
*
*
*
*
*
Bj*
C*
A *
A *
A *
A *
E;*
A!-*
y?-
WRITE IN
23-38
$
|
i
2.O
;
i
i
i
i
"o1*
i
5
-\H
1
t
/n
r
0
' ' ' ' i
: i '
i '
i '
Wli
n
H
i
i
!
: ! i
, j ' -
..
!
i
i
FIXED
TYPE
UNIT
TON
MH
TON
MH
TON
KH
TON
dH
a
PL
EA
SOL
LF
CY
LF
CY
CY
CY
NO
LB
LB
LB
LB
CF
LF
TON
TON
0
PL
'3ft
QUANTITY
39-45
^
V
J
\
i 1
ซ
s
O
s
*/&' ' JW-'S/t*-*
Kr?
DATE
46-74
'%
9
1
!|
ป
m
MATERIAL
54-60
i
^
ป (
M
MM
3
ป
0
i
-i-r-f
j
! j to
! i I\Q
1 i !
i (
^x2'^:%^^vw
\ <ฃJ\0
m
s
46
,
s
-s
*
y$
A
9.
m
*
9
P
SUBCONTRACT
54-60
^
ป ซ
IMW
T i ' *~
;
1 CC75-80
I
J
4
L
I
LABOR
68-74
|
\
i
\
i
~^yG lo
1
i
i
i
i
' 1
f
I
'
4'G
i 1
i
' 4ซ <* '
; j : ' -
1
i ; 3:O|.
' /9:0
'^*V'N^/- -"''> -',-C' '-'/.'* '' ''J/V-- ^v*'^'^'^
!
* , i
__2o^c
r-r-n
DESISNATION: PIPING
SHEET 2. OF
-------
CC1
bbTIMATE DETAIL SHEET
.
ESTIMATE/JOB NO. -*
SEQUENTIAL
PIECE*
CC11-1I
FIXED
- *. *.
MOTOR CONTROLS
POWER WIRING
LIGHTING SYSTEM
GROUNDING SYSTEM
TELEPHONE J CCHWUH.
SYS
ELECTRIC TRACING
SUBSTATIONS
INSTRUMENT W!R!ซ!G
GENL. ELECTRICAL
MATL.
ELEC. SUBCONTRACTS
TEMP. P & L HATLS.
CCCO.
POWER BILLS
TEMP. P & L SUBCOHT.
SUB TOTAL - 1500
MISC. ELECT. SUPPT.
FTGS.
DUCT ENCASEMENTS
ELECT. MANHOLES
STRUCT. STL. FOR
SUPPTS.
FAIHTiNG - STRUCT.
P
AIKTIHG - :':'
'P
STL.
PAINTING - CONDUIT
WA
WMm>//.
y&
fa
'<#
fa
%
CC2-6
ป (L
/
y\q\C
CODE-*
7
1
8
6
AREA-*
9 1
0
0
I
ITEM DESCRIPTION
17-22
1 6
0
1
s
#
23-45
LINE DESCRIPTION
17-22
1
\
\
\
\
1
1
1
1
\
2
6
6
0
2
0 5
6:Q
7
6 !0i8
6
6
0
i
9
0
7i1 0
7
7
B
3
2
0
2 S
0 1
0
1
2i3 0 1
213
Oil
1 ;
i t
j i
A
A
B
C
0
t
A
B
o
A
A
A
B
A
3
C
9
A
A
*
*
*
*
*
*
*
*
9
*
*
A *
A
*
A '*
B *
C *
W/////W//////,
WRITE IN
23-38
!
i
1
i
T r r ;
1 i . ! i
i i i
i " ! !
j
I i
*%
TOTAL gฃ
COCE: 15CO
I
_4
! i
i
--
j
: i
I
FIXED
TYPE
UHIT
HP
UNR
UNR
UNR
UNR
UNR
KVA
KVA
KVA
UNR
UNR
UNR
UNR
UNR
UNR
UNR
CY
CY
CY
LB
i
ON
TON
TON
CESSATION: ELECTRICAL
QUANTITY
39-45
\ j
(
'
~*~ r
I !
%zM
9*9-**? 2 -*/*
wM
1
w
i
DATE
46-74
*
^
"4
tfi
W
'i
MATERIAL
54-60
l
I
Z
1
4|
H^
MM
^M
IMV
o
LABOR
6S-74
j ' ^OO
1 3j<^ o o
\ yQiOQ
.
\ !
jjfit
'fa
'&x'ffi'ffi&-''4&
' &9 0 O
SHEET OF
-------
'oz ' * ' ' ^ , J- f~* . I
+* (Stout* 3L - 5nj#RV PRZP> L!N(T -*
S U B - S U M H A R Y
^'USTOMER
- LOCATION
- CODE
OiOO
_ 0200
0400
0500
0600
0700
0800
0900
" 1000
1100
1200
- 2500
2600
2900
- 3000
6fJViKoiJ*ieiOrAL i^oTEcTioO A^eOC1/ ESTIMATE no. 4nw6/y< kb.ii]
V>aR^Aiv\ OOI^TM C^^nLiwA
DESCRIPTION
FIRED HEATERS AND BOILERS
STACKS
REACTORS AND INTERNALS
TOWERS AND INTERNALS
HEAT EXCHANGE EQUIPMENT
COOLING TOWERS
VESSELS. TANKS. DRUMS & INTERNALS (/I
PUMPS AND DRIVERS f$00
7^?^
3/L1G
*
.
7OO
?O
667^340
n*TF
PICF fir
LABOR
/J-0
<ฃtL(,0
t,40
JLteoc
ซ5~OrOOO
^"00
S-^So
1*4^200
2..COC)
22:900
44\2.i,0
X2.40
.-
2.,7F3oo
4-6,,300
-------
CC1
t^ MM Alt UMAIL bMthl
ESTIMATE/JOB NO. -ป
siwcirrui
PVXEf ป
V
eeii
'I'
10
o\4
ran
. ซ. . *
EIGHT
DESIGN OF PS 16
SHELL: OIAKTER
LEN6TN T TO T
THICKNESS
HEABS: NO.. TIPE
PL
TH 1C MESS
. SPEC.
MOUNTING
SUPPORTS
EIGHT
OW. NO.
INQ. NO.
VEK30R
FREIONT
IPTEHALS
|
1
TEIIILJ
TEMALJ
INTERNALS
SUB TOTAL - 0001
SLABS-PEOESTALS
SADDLES
SUPPT. SUPERSTROCTORES
PLATFORK/LABOE
FIREPROOFIN6: T
U
TPI
LJNI
_JNSULATION: TTPEIHI
COVER
PAINTING STRUCT.
_PJINTIN6: VESSEL
STL,
CC2-I
d/m4k>
CODE-*
7
0
1
6
AREA-*
f
,C
\ 10
> 2.
ITEM BtSCtN*T1M
17-22
0 E
0
1
*
f
23-49
r
LI
17-23
1
1
1
1
1
2
2
2
2
7 0
7 1
B 0
I 0
9 0
2 Q
2 0
3 0
3 0
S
S
1
3
C
C
C
0
E
F
6
H
9
B
*
A
C
D
I
*
Q
H
1
J
*
A
B
C
u
e
\ ฃ
J
w
;
L
M
$
i
J R(
5
ME N scnrntM
WRITE W
23-30
6
o
f*
<2
6
ft
p
ฃ.
S
V
A
T
%
B
4
ฃ
N
M
X
o
V
r
ul
X
1
0
9
o
/
r
(V
N
&
/=
T
C.
E
L
4
4
o
ฃ
i
.
fป
T
0
,
d
F
F
T
o
ฃ
ft
1
7
0
X
p
r
y
0
/
H
X
J,
y
%
o
S
fa.
a
^
T
T
m
1
rau
TTPI
MIT
LB
LB
CVT
CF
CF
LB
LB
CY
CY
LB
LB
SF
SF
-toป
SF
'M
;K
1
IIAMTITY
30-49
^
^
0
0
ff
2.
(7
,
S
b
0
^
f
F
DATE
40-74
M0MM$%%^fflM
MATERIAL
94-M
If
i
O
?
^
ฃ
1
C
0
K.
C
Q
I
40
^
-
^~
^
SWCOMTIACT
94-M
^^
o
1
t
n
c>
Ml
*"
^K>
^m
^
*
CC75
1
i
It,
k
i
LAIOR
00-7
Pซซ
<
"^
f-
ฃ
/
do
7
z
3
C
o
o
TOTAL
COtf: 0800
DESI6NATWM: VESSELS, TANKS & DRUMS
in
-------
CC1
tailMAIt UtIAIL bMttl
ESTIMATE/JOB NO. -ซ
SEMfl
PtfCIf
mil I ceil-il
ป
TOTAL f
NO
. Of
run
k. ป
P
PIECES
HORSEPOWER
6 Pi
HEAD - FT.
MOTOR HORSEPOfftl
TURBINE
HORSEPOtll
FREI6NT
VEttM SERVICE
FOUNDATION
CBMCRETE DUailTIM
STRUCTURAL STEEL
STL PLATFMS - LttttRi
INSULATION
PAINT
PILING
CC2-I
4-
I
ฐl\^\o
CODE-*
7
0
1
9
AREA-"
1 1
0
1
1
ITEM KSCMPTMN
17-22
OlfllOll If
f
29-41
L
J
A<
1 E j
f
r
O
A)
ฃ
*UJ
w
LWE KSdlPTIW
17-2
1
1
1
1
2
2
2
7
7
8
i
2
3
7
0
a
0
ft
0
0
0
(
1
1
1
B
C
D
E
F
6
H
J
K
A
I
B
A
A
B
A
A
A
*
A
i
c
0
*
WRITE IN
23-91
3*
^
'
3
/
/
u
f
3
o
e
z
/
o
c
e
ฃ
F
2.
t
E
'/
<ฃ
f
W
A
i
ฃ
/=
t>
P
^
/r
H
i
A/
^
/
r
s
^
ฃ
H
/f
p
/y
4
(^
Fl
f
T
A
xป
fpT
MT
c?y
>
Pi
y
^
P
5
IBAITITY
9MI
ฃ
?
A?
L^
ฃ
P
2
q
o
.
^"
DATE
41-74
m
MTEIIAL
54 M
f
f
4
f
2
C
O
o
m
41
wwewrriACT
S4M
.d
^M
e
4
<
.
'
^
.
CC^S-lf
i
4
k
\
LAIOt
11-74
_^
!
/
O
^
^
7
F
i
1
o
o
o
i^^%^^^^-
TtTAl
mKS0i06Si06n0snaBaasissKm
^
f0wa00&
J09 { J 1 ' ! 1
. CME: 0900 DESIMATWI: PUMPS AND DRIVERS t t SKET / ซF cA |
oฐioo ,
. H
-------
S
-------
CC1
J
1
ESTIMATE/JOB NO. -o
tEoiiENTiAL ceil -10
ปIECE# ฃ - 1 G 2.
FIXED
.- ,- -
HEIGHT
TYPE
#/HR :
SCFU
DESIGN SUCT. COND OF
PSIG
DISCHARGE COND.: OF
PSIG
RECIP. STAGES -- *-
DRIVER
HOTOR HP
TURBINE C BHP
TURBINE/NC BHP
GAS ENGINE HP
GAS ENGINE RPtl
GUARDS FOR CPLG. 1 MISC.
SUB TOTAL - 1001
FOUNDATIONS
INSULATION
PAINTING
"
w
ig^uumAuiE; yfcu^
CC2-0
4-
/h
4-
o
CODE-*
7
1
J
0
1
\\
\L S>IHIฃfell
AREA-t
9 1
> <9
0
2.
ITEU DESCRIPTION
17-22
1 D
0
i
#
#
23-49
r
u
i
1 t
i
<*?
)
L.
L
*
} I\R\
LINE DESCRIPTION
17-22
1
2
2
7 0
2 0
3 0
8
1
1
A
A
A
B
B
B
B
B
B
B
B
C
C
C
C
C
C
0
g
A
A
A
*
A
B
*
V
B
C
D
E
F
G
*
A
B
q
D
E
*
g
*
*
*
m///////////////^^^^
TOTAL
WRITE IN
23-30
X
<
Y/
h
R
&
/*
c
K
O
T
a
i
^
z
/
1*1
o
W
J
<2
&
P
^
5
,
i
m
W/<
ft
h
%
^
j
1
fa
k
m
m
/
ft
&
fa
X
/?
ft
%
ฃ
fa
S
ft
h
c
o
A
FIXED
TYPE
UNIT
LB
CPU
LB
UNR
CY
SF
SF
w&
vM
COSE: 1000 DESIGNATION: BLOWERS & COMPRESSORS
[/
ป8
B
$
/^.
QUANTITY
39-45
^
^
%
tt
ft
ft
ft
%
3
ft
%
DATE
48-74
t
^
' 5vvv2vSv i
MATERIAL
54-60
#
6
/
^
(L
f
O
?
4
o
0
O
! |
4
%
0
w
s
46
i.
^
m
%
SUBCONTRACT
54-80
^M
^^
ป
, q
. 4
!
r>
*
ป!
i ;
i i :
j i
fa
%
^
MOI
j ;.
- 1
I
^!
ป ซ
#
^B
& ^
CC75-00
i
*T
i
i
LABOR
80-74
j
!j^
%
#
L
4
/
2.
4
t
y
%
n
r*
0
Q
SHEET / OF /
/OCp
1C
-------
eti
CdllMAIfc UfclAIL I*Hfcfcl
ESTIMATE/JOB NO. -ซ
UMtUTUL tCIMt
PtfCtt -0 l\0 2\f)ฃ
ran
B. ซ.
TV3TAA, F" ฃฃ%>&ฃ.
CAPACITY
SUB T8TAL - 1101
FBUtBATIMS
FT6S 1 PI Ell
SMALL SUKISTMCIMES
SUI
mm SHPfistM.tn.tl
PUTFMB 1 UMttl
-I1J
Fll
irnotr IMC Tiff TML
lEPlttfll.: TYK. T81
IKIUTIM - Aim
PHI IT 116 - ALL9JB
PA INT 118 - ALL9I
B.H
CCM
fjl/l'H^tf
CODE-*
7
1
\
1
1
AREA-i
9 1
0'
8
L
ITCI BtsenmM
17-22
Q[
0
1
f
f
9^IAI]|
LI/
AlฃNT
^>
A/
ฃ
Mฃ
UK KStHHlMl
17-21
1
1
2
2
2
7
7
7
9
8
9
9
2
3
3
0
1
1
8
8
8
8
8
0
0
8
0
2
1
3
1
1
1
1
1
A
A
8
8
C
C
9
A
A
A
A
A
1
B
A
A
B
A
5"
A
*
A
9_
W11TE W
: / <
g
..KM
2I-3I
/
/
/
a
4
M
o
ฃ
c
n
w
D
$
&
ฃ
.
ฃ
r
R
T
S
fV
ฃ
%
DATE
49-74 1-
CC75,
i
1
k
1%0^^'M- '.:ฃ' ..-: 'i'^-,-,'//;'''J^m^m^m^l
MJAMTITY
89-49
3
4
/?
o
tf
ff
P
0
q
0
3
,
i
^
>
MTEIUL
94-99
a
_
mm
I
* \
4
j_
(7
Q
o
0
ฃ_
t
ฃ
i
c
S
49
^
*
SMJCMmUCT
94-W
i
.v
..
ซ
<
> <
i
.
> '
t
MB
M
BBBI
1
B>
ป
LAIH
1
i
-7
j>
/
ฃ
4>
^>
9
0
^
^
^
c.
o
c:
'rx>r<>->::^r.^>v^^^:%^^^>;%^^/;%^^ %;'';;xl
' wnnHS.-.ilB.SCCS.iiMC^RSi
5! COM: 11QO OfSIMATMR ELEVAT9IS. CONIET9IS. IATEIIALS HIMLUG EQUIP. UK" / W / ]
MOO
-------
C1
ESTIMATE/JOB NO. -ป
MMWTUl
mat -
ecu
F
/
O
11
O
gp
run
ป . -ป
SPฃe^ป
SUB TOTAL - 1201
FOUNDATION
FTGS. & PIPERS
STRUCT. STEEL -
m
B_
OTHES
PLATFORM I LAMCIS
JIB CRANE OR DAVIT
SPEC. STLL SUPfTS
FIREPIOOflNG: TYK.
FIREPUOOfUG: TYPE.
INSOLATION
ETC.
TNR
TNR
PAINTING
PAINTING
E88J
T
m
L
B
m
d CUE: 1200
fcbTIMATE DETAIL SHEET
CC2-I
4-I/ I?l4lo
CODE-*
7
1
0
2
AREA-*
1
C
11
'i
ITEM IESCROTIOI
17-22
r
1 0
1
*
*
DATE
23m 41-74
T
U
6jฃ
i
^/
I
L
W
*T
(
LINC Kscnmw
17-22
]
]
{
1
1
1
i
2 :
2 :
1 0
1
f 1
2
1 0
I 0
1 0
1 0
1 0
9 0
I 0
1 0
) 0
8
0
2
4
1
3
9
9
1
1
1
1
1
A
A
B
B
C
C
9
B
*
A
*
A
*
A
9
WRITE IN
23 M
*P
K
_
V
fi
g
<.
'
Mo
T
/
ฃ
O
fe
Q
f
A/
,er
^
f
L
tz
D
PI
. M
T
T
*
P
^r
(j
\L
0
A-
Z
0
T
M
_
ฃ
-------
CC1
fcSIIMAlE DETAIL SHEET
ESTIMATE/JOB NO. -*
SEQUENTIAL
PIECE* -
CC11-10
V
-
/
0
$
FIXE!
>. ป ป.
CAPACITY
WEIGHT
DESIGN: OF.
PSI6
SHELL: DIAMETER
LENGTH 1
TO
r
THICKNESS
PL SPEC
HEADS: NO..
TYPE
THICKNESS
SUB TOTAL - 2501
SLABS & PEDESTALS
SADDLES FOR HORIZ
TKS.
CONC. TANK RINGS-
SUPPT. SUPERSTRUCTURES
PLATFORMS & LADDERS
FIREPROOF ING: TYPE.
INSULATION: TYPE.
THK
THK
COVER
PAINT ING-STRUCT
. STL.
PAINTING-TANK
CC2-0
4J(
14
O
CODE-*
7
2
1
5
\
AREA-*
0 10
o -z.
ITEM DESCRIPTION
17-22
2 5
0
1
*
#
23-49
LI?
ft
f H '
$
r
O
N
ฃ
c
*
\l
-R
y
LINE DESCRIPTION
17-22
2
2
2
2
7 0
7 1
7 3
8 0
8 0
9 0
2 0
2 0
3 0
3 0
5
5
6
1
3
A
B
B
B
B
B
B
B
B
9
B
*
*
A
B
C
D
E
F
G
9
*
*
*
*
*
*
*
A
*
*
W/////7////////////////^^^
TOTAL
CORE: 2500
WRITE IN
23-30
/
0
fa
h
e
P
e>
R
tyl
T
&
ฃ
T
u
%
/?
s
N
B
M
ft
%
i
&
0
ft
%
ฃ
%
w
1
ฃ
H
%
%
o
o
6
0
1
G
E
%
-
-
f
p
/
-
%
%
F
?
z
4
L
1
r
F
i
%
ฃ
''
Ir
N
$
2
fl
&
0
K
T
3
r
z>
^
ff
/
.
ft
?<
Q
w
/
h
ft
0
r
L
f
i
H
t
FIXED
TYPE
UNIT
MG
LB
CY
CY
CY
LB
LB
SF
SF
TON
SF
Wd
WM
DESIGNATION: TANKAGE
>L
>
r
K
QUANTITY
30-45
ซ
34
11%
v4
c
0
fa
O
s
40
fe?N
V
-"'
^
SUBCONTRACT
54-00
^
4
^
^
4
h
-e
n
%
m
//I
0
(9
?
^
ip
CC75
1 1
\
II
|
i
1
LABOR
00-74
. ซMB
I fa
^
Jx
0
2.
fa
ฃ
2.
.
a
fa
F
<5
0
fa
O
o
o
%
o
SHEET / OF /
Gซ?0dp
-------
-------
-------
CCI
ESTIMATE/JOB NO. -*
SEQUENTIAL
fปIECE# -
CC11-18
FIXED
.- - .. .-
ERECT. ALL OTHER:
CARB
. STL
HH/TGN *
ERECT ALL OTHEF: -t^h./^/JT/,
KH/TGH
FLO. SHOP FAB: CARS.
KH/TOH
FLC SHOP FAR: A
KH.'T
TESTING BELDERS
PI
PIHG SKETCHES
Lie
en
it
STL^
TES?. P.flHG
PIPE CASTINGS
EXCAV. FOP. UGRD; ?!P!ซG
COAT & *RAF UND^D.
PI
PING
SU3 TOTAL - 1300
CDHC.P.S. 100-'.
INC. FON.
FLO.
FA8.
PiPE ViAY TRENCHES
PRECAST P.S. -
PRECAST PS. -
FA
B'N. ONLY
ERECT.
QMLY _
PIPE SUPPT. RIGRIO HGRS.
MiNC* ?.$. - PREFAB
S*ALL SHAPES -
FID
FAB.
PIPE RACKS - PREFAB
F;
Pi
FA
PA
REPROOF. SIR.
PIHG IHSl'LAT
STl
IHTIKG STR. STL
IMTING PIPE
P
S
. SUPPTS.
TESTING
'J/fffyfTrflfriy.frfffVt -*r .""?~r}7yT*r?j
'^','Mw/:-%w< '^ v y/'&Zt
ESTIMATE DEli
CC2-8
* +
1
?ฃ
0
CODE-*
7
t
3
U
I SHEET
AREAn
B 1
*o-
0
z
ITEM DESCRIPTION
17-22
1
3
0
7
#
#
23-45
-
LINE DESCRIPTION
17-22
1"
1 3 0
1
1
1
I
1
1
I
1
1
1
2
)
3 Q
Q
T
3 1 0
3
3
7
7
7
7
8
3 S
4 0
4 1
!
1
1
3
3
3
e
i
?
0 b
a o 5
8
8
0 5
0 7
.ill
* ' n
i
3, Oil
2 3
0 1
1JJJM-
1
A
B
c
0
E
F
G
*
*
*
if
*
*
*
H *
ft *
A
A
*
*
Ai*
A *
A
9
A
A
*
9
if
*
A *
A *
A *
B
*
C *
A *
A
_n_
;
*
*
*
3i*
*'-
1
''/yti'/j'.'MW'/sl
TOTAL
J CODE: 13CO
WRITE IN
23-38
.....
R
U
&
&
"7 ฃ
&
!
i i
~
2
1 i
!
f
R
C
0
Q
r
L
1
~QO^
J
.
-
1
A
^)
A
C
T
,0
^
/
M
J
fit
Su
i
1
1 ;
i
i
j
i
\
\
f
<
i t
M
$
FIXED
TYPE
UK IT
TON
diH
TON
HH
TON
i.;H
TON
HH
P-
PL
EA
50 L
LF
CY
LF
CY
CY
CY
NO ,
LB
L8 '
LB )
!
L
B
F
r
liN
TON
SFL
^%?
CESISNATIC*: PIPING
'i
QUANTITY
39-45
3
^
\
,''
1
l_
r
1 i
2.
a
i
1
wf&
j
o
o
0
!
' ^
!
Wi*
r<
< i i
DATE
46-74
8_
i
WK
m
MATERIAL
54-60
ซ
MM
^v
1
i
i
ป
,f
%
Z
4
^^
O
I
i
.
72
_ i
ป ,
i
0
o
U
' ' i l
S/
7??,*fF?Xl
Z'S/A'///'
7!
i?ซD
tf
7?.'
C
'/'
% 1 k\4O&
S
46
*
/^
ฃ?/ฃ
fflffiffil
*7ff
Wj*V
SUSCOMTRACT
5460
4-
ซ
1
[
Mป
,
4-
ซ--
t
i
_i t
i
_j
^M
t
.
l
0
-r
-
i
t i
i i
i
f
i ;-
'
i
i
r -4 ^
'
I ' :. ''
-
! ! ; ' ;
*s'
i ป
f CC75-8C
1 i ' ; i
A
-to
J \
LA30R
58-74
' i^faidQ
i 1
i CTflloO
i i
i t
' 1
i 1
-; ! ; i
i ,
! Q\o o
' i -
i i i i
i j ' i i i
! ' 1
1 ' ; 1
l j
- ! M
T ! 1
. '. ; : f
; 1 ! ' :
i . . : ' j
1
i
r . , L i
i : 'TJ^ioj-
! , , . > j
i : ! i
i ' 1 i ;
^ . i
-J~^^3
'-^L3<*.
T "-i i ; .1
SHEET CF
-------
c
CC1
1 5 MM Alt UfclAIL SHttl
ESTIMATE/JOB NO. -
SEQUENTIAL
PIECE # -
CC11
11
FIXED
~ .- ป.
INSTRUMENT BOARDS
BD-ITO. INSTR. -
ANALYSIS INSTR
ACCESS
FLO
FLO! INSTR. FLO.
LEVEL INSTR. FLO.
PRESSURE INSTR
. MTD.
MTD.
MTO.
. FLO
TEMP. INSTR. FLO.
WEIGH INSTR. FLO.
. MTD.
MTD.
MTO.
COMBUSTION CONTROL
CONTROL VALVES
SLIDE CHOPPER
PLUS
- PKGD.
VA
VALVE POSITIONERS
BUTTERFLY VALVES
RELIEF VALVES
.A. FILTERS. REGS.
.A. TUBING &
ACCESS.
FITTINGS
.A. SUPPLY
.A. CHANNEL &
INSTR. PROCESS
SUPPTS.
PIPING
INSTR. HOUSINGS
INSTALL. CALIBRATE.
ST-UP
INSTRUMENTATION SUBCT
S
UB TOTAL - 1500
FTGS. & PIERS
CURBS & LEV. RAIL PANEL
PIPING INSUL.
WINTERIZE
PAINTING - EQUIP
PAINTING - PIPE
CC2-I
41
'1
4-
0
CODE-ป
7
1
1
5
AREA-*
1 1
o
0
i
ITEM DESCRIPTION
17-22
1
5
0
1
f
ป
23-49
E
f
'/
\
1
N
S
r
B
>v
Ml
r
M
LINE DESCRIPTION
17-22
1
1
1
1
.1
1
1
1
2
2
2
5
5
5
5
5
5
7
7
2
3
3
0
1
1
1
2
5
1
1
0
0
0
3
1
6
8
0
0
0
0
1
1
1
A
B
A
B
C
0
E
F
G
A
B
C
0
E
A
B
C
D
A
B
A
A
9
A
B
A
A
B
9
*
*
*
*
*
83%88SgZ8%8^^
TOTAL
CODE: 15QO
WHITE IN
23-31
ft
^
%
%
!
I
m
^
^
ฃ
^
%
%
h
%
%
...
&
%
%
%
T
i>,
7
FIXED
TYPE
UNIT
LF
NO
NO
NO
NO
NO
NO
NO
NO
NO
NO
NO
NO
NO
UNR
UNR
UNR
UNR
UNR
UNR
'JC
UNR
CY
CY
LF
TON
ION
w&
wA
DESIGNATION: INSTRUMENTATION
1
6I
N
QUANTITY
31-45
f
vk
Y
1
fi
I
)
A
A
^
$
i
lo
1C
Is.
H
A/
$
f*
\Wi
\m
ฃ
f
ฃ
-------
K)
CC1
S
ป
ESTIMATE DETAIL SHEET
ESTIMATE/JOB NO.
iFOUENTIAL CC11-1E
>IECE#
FIXED
. *. ป
MOTOR CONTROLS
POKER WIRING
LIGHTING SYSTEM
G?.D'JKDiSG SYSTEM
TELEPHONE & CCWJH. SYS
ELECTRIC TRACING
SUBSTATICHS
INSTRUMENT VIR1KG
GEKL. ELECTRICAL MATL.
ELEC. SUBCONTRACTS
TEซP. P S L MATLS. CCCO.
POWER BILLS
TEMP. P i L SUBCQNT.
SUB TOTAL - 1600
MISC. ELECT. SUPPT. FTGS.
DUCT ENCASEMENTS
ELECT. MANHOLES
STRUCT. STL. FOR SUPPTS.
PilNTING - STF'JCT. STL.
P,ป!KT!NG - ?f"JIP.
P
ififjMQ . ci>;GUIT
CC2-6
-ป4-
ฐ\
4
0
CODE-*
7
1
I
9
AREA-i
9 1
0'
0
z.
ITEM DESCRIPTION
17-22
1 6 0
1
#
#
23-45
LINE DESCRIPTION
17-22
1
1 6 0
2
1 6 0
5
i
i
116 0
i 6 G
1 6 C
I
1 6 1
!
1,7 1
1 7 2
1 7 2
I[BJ
7
8
s
0
0
0
9
1
2J3 jQ ; i
2 3 C
2 3|0
i j
il
1
\
i :
1 '
r^
1 1 '
A
A
B
*
*
*
C *
0 *
E *
A *
8 *
f*
A
A
A
B
A
B
C
9
*
*
*
*
*
*
*
*
9
A *
A
A
A
A
*
*
*
*
B;*
c
\
\
| . i
i
T>. - .
Ulr.L
^
WRITE IN
23-38
~^
_ _J
1
1
, :
1
i
i
i 1
|
i
i
I !
i
i
i ! i
i
1
i
!
i
1
; i i
!
1
1
1
; .
; i ' ' . j i
1
! : !
: ! , :
'&
fa
--
$
j '
i
;
FIXED
TYPE
UNIT
HP
UNR
UNR
I'MR
UNR
LNR
KVA
KVA
KVA
u
HR
UNR
UNR
UNR
UNR
UNR
UNR
CY
CY
CY
LB
TON
TON
TON
QUANTITY
39-45
i
i
i ' '
: i
1 i
1 j ]
!
re
DA It
46-74
%
m
'?
m
MATERIAL
54-60
1
1
I
4
7
k
^H
^fm
Z
o
X
0
o
o
-t
0
0
(?
0
ป
^
i
Z
o
\
/
o
'
o
o
\ [
[ / a
3 ;
c
j : i
i *
I :
i
! '
'&/%&$!%/.
$% /'WC\0'\O
'i
m
s
46
ป
%
YS
m
ฎ
SUBCONTRACT
54-60
1
CC75-80
i i
A
fe
J L
LABCR
fS-74
i : ./^^fo
i 'Jiฃ#lfli0
i i3lฃldO
, . ! j 100
i
i
1
i H-I-M
' ' i i
i i i
\
i i
i
,
;
s i i tTdo
1 ! i i i !
! i !
i . l
. : }
i ^ i !
i i i
! 1 ' :
Mi i
: . i ''
l
!
j
i
: i j 400
. ; i
1 i ! j '
' ' ' ' i ,
' ' : !
4oo
, ; : : , , ; '
! ' ' i
,
' i ' !
'%ฃ'&/;
\
:;-
^_:
^'T:
1 CCGt: ]^ . . , CESSATION: ELECTRICAL SHE
i i
JU,
'/',: ' ' ' ' - ' '', 4
23700]
o- or n
or
-------
ป2I -271
IEL
a
I UST03ER
3
I" LOCATION
r CODE
0100
r ,0200
| 0400
0500
r 0610
r fl7oo
9 0800
1 0900
1000
1100
1200
- 2500
2800
2900
r 3000
3100
32.00
J400
1300
1400
- 1500
1600
1700
_ 1800
1900
2000
2100
~%2200
2300
2400
-*2800
2700
$3300
- 3500
, s
3700
x"*QOO
00
1300
~JJM jBOO
2 QO
2100
~~ - T
SUB-SUMM
ฃKjv/lROKJMeurAL FfcorfcOIAIV SITE DEVEl6:tl H
OTAL DIRECT COSTS
A R Y
Ad.v' ESTI
MATERIAL
JJ/^QCUi
/OQ^OOO
7
ฃ~7^OO
5*4,000
(O%OOOQ
/,2. llf^oo
2.1 1 OOO
//ฃ" J&QO
30 S?0
/f?4" y3*fO
/ 3OO
/ / , 3 9O
2.^00
ฃ,455,4-10
BATE no. 4/7
PAftF
LABOR
ฃ.J5~
OF >
SUBCONTRACT
3L0LOOG
~rr -J
/.24.ooo
'/ ^00,000
I^OO^OOO
-------
\
CC1
<
ESTIMATE/JOB NO. -H
fQ"IKTlftL CCU-58
PIECE* - p\/ 0\o\A J
i
1
1
fcd
CC2-6
^4
/ ?4'0
B
ซmAซfc UfclAIL ^Hfefel
CODE -*
r IT^V! OF
17-22
0
9 0 1
1
# .1
Y
ฃ
w
T
u
/?
/
7
0
ซ
g
. . *ป r *
23-43
"fiU"
AREA-*
9 10
0,3
?Tlfปซ
/ ^
?<
1
USE OESCSJPTIOM
f'-ii. i
,. ,ป V/-22
! TOTAL PUS*
i NO
. OF PIECES
, tfOftSEPofci
i Gft
Kb
3
*ft -FT.
P0TflS^lW)8$ฃfC(Ull
Tuout Hปtf Ewwea
ffifJWt
1
' ^ FA *
J i* *
j.
i ฅEปCft SERVICE
j t i
1
j I ;
i |
i
!
:
mปn\0ป 1 "1 0 8
CO
UCPFtf ABM)LlIl(ta
SfWCTUSAL STKC
STL WJTFCS - uwes
IKDLMII9
PftlM
i --
u
i
1
1
1
7-1 ?
8
8
2!2
2; 3
LUซ
- - - -
-''
,
0 1
0 3
on
dfn
A B
A!C
A D
B*
c!*
Di*
E *
F|*
8 *
H *
j[
i^i *
t *
ft ป
B *
I *
* *
BJ*
^
i
Mi*
,
n..1
i
VifiiTE IH
23-33
f/'^'x] /o'xi//
S :/ !ฐ S *
flr
i L
U" rV
u '-..
I
-J-M j
,,_.... . ., . ....
1 - i 4 1
i ' ' I
j' r !
i
'
I
i
u
L'
4
i
I
i
i
!
i
_
. . ,ซ_,
i
9
--
-t-^L.H
-; p , T r
i
i
: i
i
1 r 1 '
| j
| :
; t
i
I ; }-
! ! ! 1 ' !
i - '
!
-
; '
' i ! '
i * I* r .m V
__
i i ((elO^jO
.
t
! 4OO
T i
i : ! ; :
__.: i__ -J
t
06
-------
cct
ESTIMATE L^TAIL SHEET
ESTIMATE/JOB NO.
SEQUMTSftl
Ktl*
CCtMtt
CC2-0
4\\ \3\4\o
CODE
AREA-*
to
DATE
t-r~r '-
L_L.-
17-22
0|9|0|1 ,.
i . i ง
E* DESC3IPT10H
rc A
23-45
u
L
46-74
F'rXID
i """*
X
i i i
f? de
2iZ,o!0
cy
i
4-H-4
S 0
810
33
_i^yriM
fftiBT
PปUR&
2 0 1
3! 01 1
ปr
ฅ
2i.7lC!!!Ai
-ji-
^
AT--^-^
*
-4
:;r:T 2.
!
1JL
-------
CC1
fcdMMAIh UMAIL 5Httl
ESTIMATE /JOB NO. -
SEQUENTIAL
PIECE*
CC1M6
V / 0 0 A D
FIXED
.. .- ~
CAPACITY
WEIGHT
DESIGN: OF.
PSIG
SHELL: DIAMETER
LENGTH T TO T
THICKNESS
PL SPEC
HEADS: NO..
TYPE
THICKNESS
SUB TOTAL - 2501
SLABS & PEDESTALS
SADDLES FOR HORIZ. TKS.
CONC. TANK RINGS
SUPPT. SUPERSTRUCTURES
PLATFORMS & LADDERS
FIREPROOFING: TYPE. THK
INSULATION: TYPE. THK
COVER
PAINTING-STRUCT. STL.
PAINTING-TANK
CC2-8
'4
1 <
"two
CODE-*
7
2
8
5
AREA-*
ITEM DESCRIPTION
17-22
2
5 0
1
*
*
V
IE
23-45
i"
'T(
/
R
/
H
ฃ
(J
1
f( <
i
LINE DESCRIPTION
17-22
2
2
2
2
/
7
7 .
8
8
9
2
2
3
3
J 5
5
i 6
J 1
] 3
1 1
3
] 1
J 1
3 1
A
B
B
B
B
B
B
B
B
9
B
*
*
A
B
C
0
E
F
G
9
*
*
*
*
*
*
*
A
*
*
Y/////////////////////#^^^
TOTAL
CODE: 2500
WRITE IN
23-38
f
C
ฃ
ft
B
P
i
u
T
Z
3
f
/
&
,
O
ff
/
v
V
i
6
*l
^
w
'
'
s
"
ฃ
O
f
r
(a
r
AC
N
'a)
~
H
it
0
F
-j
/
P
L
JL
\
4
..
/
i
&
T
/
ft
.
N
P
8
ฃ
O
\ ' ,
\ i '
^
ฃ
\
\
%
%
%
'ft
%
>v
%
ty
^
^
c
\D
R|e
T
r
%
T
C.
P
ฃ>
'
j
#
%
O
$
n
u i~.
1
C
10
I ^
ซ
FIXED
TYPE
UNIT
MG
LB
CY
CY
CY
LB
LB
SF
SF
TON
SF
WA
wA
DESIGNATION: TANKAGE
7
^ f\
V
K
B
QUANTITY
31-45
^
%
K
4
ฃ
$i
'A
J
M
w
(^
s
1
5
^
SQ
^
2
7
h
C
S
o
%
0.
DATE
46-74
%
W,
ty
MATERIAL
54-60
C
I
A
ซ
2
ff
^
Zjb^
^
.
iป
o
t
f#
!
i i
^
t
ซ
s
46
t^
!^
SU6CONTRACT
54-60
-i
^
S
c
i
I
M- <
^^ *
' 1
o
ป
i
gz^/
i 1
o
w
<:
: | [
^
(979
ii_-
\
\
LABOR
68-74
^f
MB
1^
#
#
0
3
<
...-.
ฃป
ซ
^
D
ซ>ซ
O
o
C
i
1
%
f ^T SHEET / OF 3 ^
-------
CC1
ESTIMATE/JOB NO. -o
SEQUENTIAL
PIECE*
CC11-10
V
i
0
1
A
b
FIXED
- + ป
CAPACITY
HEIGHT
DESIGN: OF. PSIG
SHELL: DIAHETER
LENGTH T
TO i
r
THICKNESS
PL SPEC
HEADS: NO.. TYPE
THICKNESS
SUB TOTAL - 2501
SLABS & PEDESTALS
SADDLES FOR HORIZ.
TKS.
CONC. TANK RINGS-
SUPPT. SUPERSTRUCTURES
PLATFORHS & LADDERS
FIREPROOF ING: TYPE.
INSULATION: TYPE,
THK
THK
COVER
PAINTING-STRUCT
PAINTING-TANK
STL.
ffl%
m
w
m
m
w
ESTIMATE DETAIL SHEET
CC2-0
4
1
94
o
CODE-B
7
2
0
5
AREAH
01
to .
0
3
ITEH DESCQIPTION
17-22
2 !
) 0
1
ป
*
23-49
7
C
' A
R
e
C
i
R
C
. 7
4
v
LINE DESCaiPTlOa
17-22
1 '
1
1 '
1 f
1 i
1 J
2 ;
2 2
2 :
2 :
f 0
f 1
f 3
) 0
0
) 0
' 0
1 0
0
0
5
5
6
1
3
1
1
1
1
1
A
B
B
B
B
B
B
B
B
9
B
*
*
A
B
C
D
E
F
G
g
A
*
*
TOTAL
COOt: 2500
WRITE IN
23-30
f
ft
v<
5
0
6
r
^
z.
P
O
P
4
Y/<
#
0
o>
&
3
e
E
r
ft
N
W
'
x
/
s
V
r
ff
c
*
ft
ft
T
j
/
C
/f
/v
'/<
%
ff
t>
r
H
E
/
4
1
"
o
f
v>
P
'
f
O
ft
%
/
/Y
D
ti
%
n
4'
ฃ1
1
ttti
R
>ฃ5
)
ffl
ฃ
0
35
d
c?
#
0
44
^f
*S
FIXED
TYPE
UNIT
HG
LB
CY
CY
CY
LB
LB
SF
SF
TON
SF
WM
QUANTITY
30-49
4
7
^ to
% X5
^
ft
R
0
1
4
%
ฃ
o
2
0
fi
3
o
ฃ
P
B
R
DATE
40-74
m^
OATERIAL
54-80
^
%
ป
OP
A
ป i
*
i
2
i -
3
^
J
O
ซ
0
o
i*
^^
s
40
-
l^j
^
%,
'i
%
SUDCONTRACT
94-00
^
/
ซ
ซ
ซ
2
M^
(*
/
e
*
-
W
1
O
0
^M
ft
O
fyt '
C(?75-OC
J
j
I
L
I
LABOR
80-74
^
^
/
A
3
/
0
IS
3
*}
0
>
:>
W
\
o
ซ
0
OESIBMATIOn: TANKAGE ^ 6 SHEET - r. OF 3 ป
-------
CC1
ESTIMATE/JOB NO. -t
SEQUENTIAL
PIECEf
CC11
V
(
o
-10
2.
A
P
FIXED
*. - -
CAPACITY
WEIGHT
DESIGN: OF.
PSIG
SHELL: DIAMETER
LENGTH T
TO
\
THICKNESS
PL SPEC
HEADS: NO.. TYPE
THICKNESS
SUB TOTAL - 2501
SLABS & PEDESTALS
SADDLES FOR HORIZ
TKS.
CONC. TANK RINGS
SUPPT. SUPERSTRUCTURES
PLATFORHS & LADDERS
FIREPROOF ING. TYPE.
INSULATION: TYPE.
THK
THK
COVER
PAINTING-STRUCT
PAINTING-TANK
, STL.
w
^
%
w<
M
It &U
CC2-0
> A.
/
7
4
0
UmAUl^ 01&TAU1L ^HliLEY
CODE-o
7
2
C
5
I
AREAn
0 1
* G
0
^
ITEB DESCRIPTION
17-22
2
5
0
1
#
*
*
Q
iJ
23-45
(;j
$
^
ฃ
f?
ฃ
' L
'M
?ฃ
LU1E DESCRIPTION
17-22
1
1
1
1
1
1
2
2
2
2
/
7
7
8
8
9
2
2
3
3
U
1
3
U
0
0
0
0
0
U
b
5
6
1
3
1
1
1
1
1
A
B
B
B
B
B
B
B
B
9
B
*
A
B
C
0
h
F
G
9
*
*
*
*
*
*
*
A
*
*
TOTAL
CODE: 2500
WRITE IN
23-30
/
/
/
7
a
u>
UJ
>
T
f
O
ฃ
/.
/
/
h
K
s
fa
fa
ft
fa
O
7
/
A
/
F
K)
N
'fa
%
7
T
5.
/V
^
/
/
K
(9
0
h
0
*
e
.
pr
7
$
C
%
?
o
w
N
(
c
O
K
ty
Q
ff
K
X
0
o
*
g
'fa
4
X
/
oJ
f
/Y
/
^
I>
/*
0
/V
A
ft
1
#
^
X
3
r
C
F
C
c
<^
'
)
3
L
R
X.
c
<2
P
0
f
*
4
F
e
,
'
E
u-
'i
U
f
K
A_
r
r1
U
A
ft
?,
o\
" L
ฃ
g
ฃ
ป
N
/
%?
>0?
FIXED
TYPE
UNIT
-> UG
LB
CY
CY
CY
LB
LB
SF
SF
TON
SF
W4.
\WM,
QUANTITY
39-45
4
/ ซZ
.
^
o
K
o
S
0
ti
*fa
%
%
fa
V,
$
o
fa
DATE
40-74
i
^
w,
mm
MATERIAL
54-00
/
%
1
(P
k
fa
OJ
B '
4
m < 9
y
"1
94
DjO
>
^ft
If?
A
0
'0
fa
o
s
40
^
m
ป
m
m
SUBCONTRACT
54-00
^
^
I^H
^0
C
4
M>
V
0\Q
|D
ซk
~^
a
! !
' ' ' : i
I
' ' 1
fa
'
a
^
/
fa
C
'fa
7
r?
-
r*
-t
0
ฃ
O
o
OESISBATIOB: TANKAGE . SWEET f OF ^
-------
CC1
ESTIMATE/JOB NO. -ซ
SEQUENTIAL
PIECE*
CC11-13
f\ i t
^j 1 r
- J--
O
O
A
^
w
FIXED
*. - ..
KE
IGHT
HORSEFCSfER
SUB TOTAL - 2901
FTSS. i PIERS
INSULATION
FAIHTINS
fcallJVL
CC2-6
-41 M?
4-
e>
Alb UirTAIL JปH6ET
CODE-*
7
8
29
AREA-*
9 1
O.
0
I
ITEM DESCRIPTION
17-22
2
9 0
1
#
#
V
ฃ
'*
ป r<
j
R
23-45
/
f(
e
'0
;
/?
c
LINE DESCRIPTION
17-22
i
1
2
2
/
2
t
!
c
0
i
Ton
i
| 1
i
i
i
i i
i
t
I
A
B
9
A
A
A
*
*
9
*
*
*
f<^%T^^^
TOTAL
- CODE: 2900
WRITE IN
23-38
4i
t\
3
^
0 '
ulfi
ฃ
4
e>
r
t
t
^
g-
W
X
*,
ฃj
/
1
i j
i
i
i
e
f
e
f\
N
^
! !
I
i '
i i
!
^l^lpplpj
^
^^^^^^^^
DESIGNATION: AGITATORS
m,
d
d
X
N/
f
r
e
ซ
f?
i
^^^
m///z%zm
* L .
FIXED
TYPE
UNIT
* IB
HP
CY
SF
7
^\
ป
\
6
T1
QUANTITY
39-45
I
%
0
e
|
! i
^^g^i^^P^
w//%mm!m%.
DATE
46-74
%
MATERIAL
4* 54-60
L_l
4o
i
7
p
i
i
i
i ! !
i
i j
i i !
1
' '
; . ;
^'&%$0ฃt%Z%a
V,
s
46
*"
%
%
9
P
SUBCONTRACT
54-60
M
ป
*~
^
1M>
i
i ~~
i
j j
i
i
r~
CC75 80
j
j .
"
LABOR
S3-74
j Sl^to
i ! <
' ! i
1 ' ! !
i ! !
; i ''
! i ' i ;
* i ! !^'^P
' ' ' i (
i I <
! i :
i
: i
i ;
[
1
'
i i i
j
t
j
' i
lit
1 i f ! ! 1
. : i ; ! !
i ' i
1 ' '
t . ;
1 I : ' ' , !
' ' ; !
; | 1
f ; I : i ! i j j
i J
t
i
i
1
I
!
i j j
-\
1
i
\ \
i : | i ; .
i ! ' i '
i i ! !.
1 .' i : ! i
' ' 1 :
Ji.i1' i
i . : i i :
i ! ; i ;
! i
ffi y/f%?>-;/i;ti, ''%>:'; %&&&y^-''J
i MIXERS 1
i : il! :
1 ! , | j
JL SHEET / OF -2^ j
Jfc ฃL J. ^^
>X
6l\* Tff *
O II f -J&f-
-------
CC1
KJ
*-*j
{ CS2-6
SVu1'"
"K
/JC3
,S'0. -!
A
ccii-^.a
Tfi/
^|D
FiXEU
.- ~ ..
*E
IGHT
HMSEPMER
Mil f
3 !
4'<9
:5I8M<
Alt Ufclฃ
i!
ปL^ 8 C r^ a *
5 ^ JHj a* IJ" 2
i ฃ W? a a t, ij a
1 j 7 3 j
! CODE-H-'* AREA-*
s no
ปol3
ITEM DESCRIPTION
17-22
2J9JO
1
#
#
T
C
A
^
g
23-45
c
1 R
c
*
1
"A
M
LINE DESCRIPTION
17-22
j
i !
SI
B TOTAL - 2SG1
FIGS. 4 PIERS
INSULATION
FAlSTING
Ti7M a
^2
2
2 0 1
0
c
0 1
i i
*Tffi%fy'/7%-y/%ys2?Z5fys. ' '>
TOTAL
J CODE: 2900
j
j
i
i
j
i i
A
S
*
*
9 9
A
A
A
*
*
*
i
f
WRITE IN
23-38
C
77LJ
*
/?
=2b
I /
Q\
U'B
i
r
tf'
\B
i
i
;
;
t i
t
t
i
L.
^
^
/ป
X
fi|/p
\
' ^_L
1
j
i
ฃ
<2
C
2_
4>
p
*
4
x
&
T
?
fV
T
f
/
4
V
(f
D
A
i
e
R
K
e
J
\ ' i
f
t :
i
i
j !
; i 1
. !
T
i i i i
<
!
1
' ;
1 i
i 1
mmxmmfr
| i
i
i
1
l
i
!
^W^^^^y^W^^'
OESISMATIQN: AGITATORS
,
?">-;-
,'&
Wfr
K.
/a
FIXED
TYPE
UNIT
L8
HP
CY
SF
77^77^.-
i^< :':
& MIXERS
k
IJT
ซv
r
,
QUANTITY
39-45
P
/
0
i
1
j
ob
i
1
!
i j
: i
i
i
)
,
1
1 1 1 '
#&vxtm^
wsffifia
fc<ฃ%^
^^^
>t>
?v
'4
( 2ti5-CC_J
DATE Ll_i_._.LlJ
>'ซ
'i
43-74 -sJ
P
i
MATERIAL
54-60
J5!/l
^^^^^^^ T
S
46
SUBCONTRACT LABOR.
54-EO ฃ8-74
_L T-4-* h : i -I'O&O
: : i i ! : i |
! ; , :!'!
! i i ; : : i
; .''!!!
j ; i ! ' !
! i ' ; ; . J
i_ i _L J ' 1 i
* '-i . r - i ; ^.S^o!"
1 ' ' : .: i i . j
i i ' ' 1 . , . *
1 ! : ! ! - ' i {
i : t ' ; - , ' ;
1 *
i . . i ''' i
i ' . : , ! j : . !
: ; ! ; : i
j . : . i
i : ; ' I . ; i ; i 1
i . ' ' L ' i . ' ' ' j
: .!:!
; ; : : M | ' f
; : ; i , i j ! i
: ' i ; . i i i |
: . i ; : \ ; . i
i i : i I.!;1)
i i i i , ; i 1 i i
! : j ' I ! i ' ' > '
! I : '''!';
i : ; ' i ' i !
' i i ' . ! '
' . i
; : : 1 :
' ' i : . ''.'''
wr- .-ป- -t --...-^-.,-. ..<ป......,._
''/ft.-'-'- /*; < : :'. "';, ' :'
*-* i ฃ. 4 I o.
SHEET Z C? Z. j
-------
CC1
ESTIMATE DfeTAIL SHEET
ESTIMATE/JOB NO. -ป
SEQUENTIAL
PIECE* -
CC11
L
/
0
18
p
A
t>
FIXED
- * ป.
{(EIGHT
SUB TOTAL - 3001
SLAB & PEDESTALS
FLOOR SLABS AT
GRADE
HORIZ. HTD. EQUIP.
FIGS, t PIERS
SADDLES FOR HORIZ.
TKS
SUPPORT SUPERSTRUCTURES
PUTFOStt i LADDERS
FIREPROOFING:
TYPE
INSULATION: TYPE
THK
THK.
COYER
PAINTING: STRUCT
. STL.
PAINTING - EQUIP.
CC2-6
4
f '
'1
f
0
CODE-*
7
3
g
0
AREA-*
9 1
* O i
0
B
ITEM DESCRIPTION
17-22
3 0
0
1
*
#
23-49
V
ฃ
J
8
0
5
1
3
1
1
1
1
1
1
A
A
A
y
A
A
A
A
9
*
A
B
y
*
*
*
*
*
*
*
*
*
A
*
*
^^//^^^^^^^^^^^^^^^^
TOTAL
CODE: 30QO
WRITE IN
23-38
c
f
.
y
&
c
0
....
\
)
)
o
s
ฃ
If
\fj
u.
-
^
"
1
J
!
c
U}
K
0
/
5
/
/
0
P
Q
0
7
..
*
/
o
A
o
0
Q
1
i
3
o
X
ง
e
F
7-
r
r^
A
/t
4
ฃ
1?'
/:
C
c
r
$
c
(>_
(y
0
A
'
o
N
0
7
T
^
f
"f.
tf
ER
<
FIXED
TYPE
UNIT
IB
\
)f
I""
i
CY
tY
CY
CY
CY
LB
IB
SF
SF
SF
SF
W/A
^
fc^
DESIGNATION: SCRUBBERS 4 ENTR. SEPARATORS
>
*
QUANTITY
39-45
Ml
^4
W
^
tlC
J^
??
0
V
'/
f^
ซ
d
f^
0
-e
^
0
>
^
^
o
fyfy
%
DATE
46-74
%
'4
ml
^
MATERIAL
54-60
/
i
<4
3
> c
^
o
M
ซ
*
0
;
1
t
',
[
CC75-80
T"
J
i
i
i
LABOR.
68-74
^^^^^/<^f
If
'&
^^
H
^
i*
-
S
0
IP '
z
r
ซ
c?
1
o
.
0
44
$ SHEET / OF 3 ^
-------
CC1
t^llMAlb UtIAIL SHEET
ESTIMATE/JOB NO. -*
SEQUENTIAL
PIECE*
ecu
L
/
0
-18
/
A
t)
FIXED
ป. *. .-
WEIGHT
SUB TOTAL - 3001
*
SLAB & PEDESTALS
FLOOR SLABS AT
GRADE
HORIZ. MTD. EQUIP.
FTGS. & PIERS
SADDLES FOR HORIZ.
TRS
SUPPORT SUPERSTRUCTURES
PLATFORMS & LADDERS
F IRE PROOFING-:-
TYPE
T
KK
INSULATION: TYPE. THK.
COVER
PAINTING: STRUCT
. STL.
PAINTING - EQUIP.
''tyMWfr/ffi?'
wmm.
TOTAL
CODE: 3000
CC2-6
+ A
/
7H
o
CODE->
7
3
a
0
AREA-*
\
C
10
> 3
ITEM DESCRIPTION
17-22
3
0
0
I
*
#
23-45
T
C
f
ik
ฃ
c
/?
o
8
9
ฃ
^
5
LINE DESCRIPTION
17-22
2
2
2
2
/
7
7
7
7
8
B
9
2
2
3
3
0
0
0
1
1
0
0
0
0
0
0
0
5
7
8
0
5
1
3
A
A
A
9
A
f}
*
A
B
9
*
*
J\
*
*
/
f
\
'%/%%%%%%%%
WRITE IN
23-38
2.
ฃ
3
(V
}
*t
J
(
P
f
0
5
p.
/
IHC
i
|
ft
T
b
N
ty
u
L
T
0
A
6"
/
/
E
o
&
K>
/
f
5
*
0
t
i
P
7
%>
*
H
T
ซ
.4-
K
ฃj
Q
L
C
i
p
4
^
t.
P
X
K
* '
M
\
0
a
e
$
A
P
P
4
V
o
p
J,|
)
CY
tY
CY
CY
CY
LB
LB
SF
SF
SF
SF
m
DESIGNATION: SCRUBBERS & ENTR. SEPARATORS
^
0
QUANTITY
39-45
^
rV
Q
It
#
W<
O
^
V
Jr
#
4^
o
"
^
o
*
0
%{^
&.
%
o
o
DATE
46-74
1^
^
' ^
\4
Y'<
MATERIAL
54-60
^
2,
\
o
I^K
yflfa.
1
o
*,
t
-c.
ft
\
o
ป
4
^j
0
^Ml
^
y>
O
C
^
%
s
46
-
f^^;
>
1
ฃ
^
^
^
SUBCONTRACT
54-60
^
^
^M
<
4-
^
^^
^
c
s>
//f
\
f)
m
0
o
1
^
f
CC75-80
i
'A
L
k
LABOR
68-74
^
1
^
iMM
/
c
o
/
O
-
*i
V"
o
^
[^7
a
.ป
Q
1
$r'/%?%2%
1
t*
I SHEET JL OF 3 1
SQ&O ^ (&XOUP T7T '
-------
CC1
t^llMAIt DfclAIL bHttl
ESTIMATE/JOB NO. -ป
SEQUENTIAL
PIECE*
CCH-18
L /
o a A D
FIXED
.- *. -
WEIGHT
SUB TOTAL - 3001
SLAB & PEDESTALS
FLOOR SLABS AT
GRADE
HORIZ. HID. EQUIP.
FTGS. & PIERS
SADDLES FOR HORIZ.
TKS
SUPPORT SUPERSTRUCTURES
PLATFORMS I LADDERS
FIREPROOFING:
TYPE,
THK
INSULATION: TYPE, THK.
COVER
PAINTING: STRUCT. STL.
PAINTING - EQUIP.
CC2-6
4l/l?l4|o
CODE-*
7
3
t
0
AREA-*
ITEM DESCRIPTION
17-22
3 0
0
1
n
#
9 1
o.
0
3
23-45
H
0
fi
Z
S
T
G
ฃ
:A/|r/
?
LINE DESCRIPTION
17-22
'
'
'
f
1
2
2
2
2
J 0
1 0
r o
i i
i i
) 0
J 0
9 0
I 0
2 0
3 0
3 0
5
7
8
0
5
1
3
A
A
A
g
B
*
A
B
9
*
*
W//W////////////^^^^^
TOTAL
CODE: 3000
WRITE IN
23-31
a
u
$
rr
3
H
f
0
)
f
\
t
ฃ
E
S
p
IAป
(M
'/t
%
V
y
^
vv
vv
0
/?
u;
/
/
1^
5^
P
O
/
^
^
f
d)
M
H
/
O
0
f^
^
e
A
to
0
ft
*
J>
0
&
m&
e
r
f\
A
^
fi
tf
#
0
c
^
>>yy5
;
p*
C
C.
^
%
01 0
ซ
n
MB
^
O
0
ป
Xk X
o
CC75-80
1
i
>
L
L
LABOR
68-74
^
3
MM
I^BUi
I^H
^
?
^
>
*<
C
^
7
2
f
, .*
5"
^
J
MM
5
^
C7>5"
O
MB*
O
yv
c
SHEET 3 Of 3
I7IL
-------
CC1
fcdllMAlk DETAIL bMttl
ESTIMATE/JOB NO. -
SEQUENTIAL
PIECE*
CC11
-16
FIXED
- ซ. -
BARE PIPE: CARBON
STL
ALLOY
OTHER MAILS.
VALVES: CARBON
ALLOY
STL.
OTHER MAILS.
FIGS, FTGS: CARBON STEEL
ALLOY
OTHER
NATLS.
SPECIALTIES-TRAPS
, ETC.
SPRING HANGERS
EXPANSION JOINTS
SHOP FAB'N. - VDR
. CARB.
STL
ALLOY
ERECT. UNDERGROUND PIPE
M H TON
ERECT. RACK PIPE:
CARB.
STL
M.H TON
ERECT. RACK PIPE:
1
ALLOY
CC2-6
A.
/I?
f
C
CODE-H
7
1
\
3
AREA-"
I
. c
to
13
ITEM DESCRIPTION
17-22
1
3 0
1
9
*
23-45
LINE DESCRIPTION
17-22
1
1
1
1
1
3 (
3
3
3
3
) 2
) 3
0 4
G 5
0 6
A
B
C
I)
t
F
G
A
B
C
D
E
F
G
A
B
C
D
E
F
G
H
1
J
A
B
A
B
A
B
C
D
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
y/mtti!mwmmmmm'//ym
TOTAL
CODE: 1300
WRITE IN
23-38
#
K
H
ฃ
0
1
I
i
?i
0
0
8
%i
P
K
ft
%
%
t
A.)
\
>
U
7*
^
%!
p
^,
^
h
/
?<>
ty
1 f\
fti
w
f
M
w*
r>
y/t
%
ft
z
FIXED
TYPE
UNIT
TON
TON
TON
TON
TON
TON
TON
NO
NO
NO
NO
NO
NO
NO
UNR
UNR
UNR
UNR
UNR
UNR
UNR
UNH
UNR
NO
TON
TON
ION
TON
MH
TON
MH
Wti
w/a
DESIGNATION: PIPING
DATE
46-74
CC75-80
i
^^1^^^^^^^
QUANTITY
38-45
^
%
/
'6
?<
<7
0
4
&
8
2.
a
7
ft
%
r
r
T
%
&
6
N
N
N
%
%
MATERIAL
54-60
#
4
2
ฃ
4
ii
2,
~
- -r/
L
$
%
ฃ
2
4
0
0
/)
o
00/)
?QQ
6
5
0
2
i
7
%
!
$
1
0
fa
0
0
0
'h
0
Q
C
o
0
o
^
0
0
^
s
46
##
SUBCONTRACT
54-80
'
^
%
^
^
'//.
\
\
LABOR
66-74
|
1
''/,
M
_L
%
^
n
J SHEET OF
-------
CC1_
ESTIMATE DETAIL SHEET
ESTIMATE/JOB NO. -*i
SEQUENTIAL
FIECE* *
CC11-18
FIXED
- - .
ERECT. ALL OTHER:
CARB, STL
UN/TOM "
ERECT ALL OTHER
taoi
Pttฃiฃ NH/T
jLL.
u
FLD. SHOP FAB: CARB.
NH/TON
Of
uep
STL
FLO SHOP FAB: ALLOY
NH-'TON
TESTISG WELDERS
PIPING SKETCHES
TEKP. PIPING
PIPE CASTINGS
EXCAY. FOR UGRD
. PIPING
COAT & WRAP UNOGRD.
PIPING
SUB TOTAL - 1300
COHC.P.S. 100',
INC. FON.
FLO.
FAB.
PIPE KAY TRENCHES
PRECAST P.S. -
PRECAST P.S. -
FAB'N. ONLY
ERECT. ONLY
PIPE SUPPT. RIGRIO HGRS.
MINOR P.S. - PREFAB
S*ALL SHAPES -
Fl.0.
FAB.
PIPE RACKS - PREFAB
FIREPROOF. STR.
STL.
P.S.
PIPING INSULATION
FA
INTING STR. STL
SUPPTS.
PAINTING PIPE
TESTING
Tjyfy
'?%%%&'%%
'/,
CC2-6
4-1/19
&
<9
Q.
O
0
i
1
^
1
1
i
-
.
^?H
|
^n
MUJ
i ^
ft
i
1 !
1
'M
^
^
ty
*
$
K
%
I
$&
fy
^?
wm
1
FIXED
TYPE
UNIT
TON
NH
TON
NH
TON
NH
TON
MH
'.PL
EA
SOL
LF
CY
LF
CY
CY
CY
HO
LB
IB
LB
LB
CF
LF
TON
TOH
f
FL
DESIGNATION: PIPING
QUANTITY
33-45
/
i
'
\
f
,
4
4
2\ rw
z
7
8
0
2
r
T
o
4
\
H
N
c
O
DATE
46-74
ง
%
4
'4
WKW
MATERIAL
54-60
i
2.
V
o
0
\Zb
o
0
3(^00
Z\S\ao
Mffiffiffi/fiffl
/ \z\sfo\ &OIG
^
S
48
-
-
--
ซ.
SUBCONTRACT
54-60
1
i
i
i |
1
1
i
i
ซ^
4
ป
^^
! 1
ป 1 K ;
.-4 .
t 1 !
r
a
75-80
i
i
L
1
LABOR
68-74
T
?
i
!
&
*
X
7
1
d
PH
C
1
ft
o
0
(0
\
! i ;
i
j .
. |
\
!
i
i
i
>
o
0
f7
j
!
i [
i
i Jf
i
"^ i
^00
" i
:
i
i
t i
O
1
/i^t^iO
i i i j
! : ! ] ' ''t''i''-5i-d&
: i ; i
'4ffis/ffi&X/ s/'^Y/.'
1 !
i
SHEET
1 i ;
fs&-2'.a
OF
*
-------
CC1
fc51IWAIt DETAIL bHfcET
ESTIMATE/JOB NO. -*
SECUEKTUL
PIECE*
CC11
-IS
FIXED
,. .. ,.
INSTRUMENT HOARDS
8C-HTD. INSTR. -
ANALYSIS iNSTR
ACCESS
. FLD
FL:K! IHSTR. FLO.
LEVEL INSTR. FLO.
PRESSURE i?i3TR
. MTO.
MID.
MTD.
. FLO
TEH?. INSTR. FLD.
KEIGH INSTR. FLO.
. MTD.
MTO
HTO.
COMBUSTION CONTROL
- PXGD.
CC'ITRCL VALVES
SLICE CHOPPER
PLUS
VALVE POSITIONERS
YA
BUTTERFLY VALVES
RELIEF VALVES
1
.A. FiLTtRS.
.A. TUBING i
REGS.
ACCESS.
FITTINGS
.A. SUPPLY j
t
i
.A. CHANNEL 4
HSTR. ??GCE:S
SI
:?PTS.
Pi?
K3
INSfR. HOUSINGS
INSTALL. CALIBRATE.
ST-UP
INSTRUMENTATION SUBCT
S
US TOTAL - 1500
FT3S. s Pirns
C
p
J?8S i lฃV. BJ!
AISTiNS - E'v!
L PANEL
11MEHZE
IP
PAIMTIN5 - PIPE
;
{v^v
'fy/Ws'/fc''/'
v
--;
7^y
CC2-8
* 4- 1 J9l4-lo
CODE-*
17-22
1
i
9
ป
ฃ
Pfi
7
a
1 5
AREA-
ITEM DESCRIPTION
^
23-45
/ t
vjs
-r\R
U
r-
IE
:N
rl
LINE DESCRIPTION
17-22
1
i
5
1
0 3
i
j
5
1 1
i
i
t
1 i 3
i
i
1
i e
i
i
5|i E
1
i
5l2!C
1 5
i
]
5 0
i
7-0
1 7 0
2 2 0 i
2! 2'GJ
230!
l
A
B
A
B
C
0 |
E
F
G
A
B
C
*
*
*
*
*
P *
E
A
B
C
D
A
B
A
A
*
*
*
*
l
9i9
l
A
e
I
A
B
i
WRIT: i*
23-38
i !
j
i
i
_
1
i
\
i
i
i
i
i
! i
i
i
1 ' j
i
vffi&ss
\ \
i
i
'yfflffi'
TCYAL cฃฃ#X#ฃ
5fTc
[ ฑ V
1
.
i
j
A
T
J
FIXEU
TYPE
I HIT
LF
NO
M
HO
NO
NO
NO
NO
flO
HO
NO
NO
NO
NO
UNR
UNR
UnR
UNR
UH8
UNR
0
MC
UNR
CY
CY
LF
T
ON
TCN
0 N\
QUANTITY
33-45
!
1
l
i
r
*
i
i
!
i
i
I
i
,
i
ฃ
' i i i
1
; j ',
i :
mm
DATE
43-74
Wฎ
MATERIAL
, 54-60
i
l
i
2\ Wo
iฃ9
/
\4
ฃ
(n
/
2
/
0
X\o
_
,r
o
C
r>
oo
0
a
70
to
0
c
2.
Sl'>''&&&*
?'LO'iO
1
>
~T
;
f ;
l ;
t ! |
; 7Lฃ"^Ot0!
: . j
' :
; i
1 1
; i
I :;.-.
t
/ !
/
\ \
!
!
i ! |
. 1 r
1
t
1
1
' :
i ' 1 j
j j !
: i 1
! ' -
: ; i i
; i
i : : i
,
>
"ifซ''l
-
-?
L
OESI3HATO: INSTRUMENTATION
r
'^T
f
rr-
i 8ฃ>ฃ)
;'!!
: . ' ;/!^"0'<5v
1 ; i ' . '
j : '261Q
! :
* T ' i
i ' ! 1
, . 7 & /.o 01
SHEET / C- /
-------
-0
CC1
s
ESTIMATE DETAIL SHEET
CC2-6
EST'MA"1
EQ''MT'AL
PIECE*
T/JOB NO.
CCli-16
F1XLO
.- ~
MOTOR CCiiTROlS
P:
L
,*ER 'JliRiNG
-. -:i ^ SISTE
*
GP.OUWiSG SYSTEM
TELEPKCHE & COM.WUH. SYS
ELECTRIC T?fcCI
NC
SU3STiT!"-'S
!Kv7.ซ.JEKT KIRISG
GiKL. ELECTRICAL MATL.
ELtC. 5U6CPSTR4CTS
T
?ซ?. ? 4 L V.ATLS. ^';"0.
FOVi'ER PILLS
TEMP. P I L SU8CGHT.
SUB TC7AL - IE
GQ
U
0
SC. ELECT. SUPPT. CTGS.
JCT ENCASEMENTS
ELECT. HiXHCLES
c
F
P
Tr".""r. CTL c
:"-:iNG - SiR
r o o 1 1 o T T C
v t \i *,
UCT. STL.
IP
^MT'.MG - CCHDUIT
-*-d-j /
7
A,
Q
CODE-**
7
T
8
is
AREA-*
JMO
0'
I
ITฃซ DESCRIPTION
17-?2
liG'|Q|l
#
n
LINE
17-22
I
hll6 ฐ
i i
i s
i
HD'O
i
i
5
i 1
liBiO
ileto
1|8IO
1
i i
1 JR il
7
3
9
0
i i
i
!
:
lUt1 0
r7,2
\'.l 2
:'=> 0
2" 170"
ltdo
2!3iO
!
0
Q
i
"l"
J..
J
j i
i
c-
W^M*
T
Dฃ: -'-r-r.
^'^ ''?'''''''?'''
OTAl
1 ' !
mz
OE:
*-
A
A
B
C
D
t
A
8
C
A
A
A
B
A
8
C
*
*
*
*
*
*
A
*
*
*
*
*
*
*
*
*
9
g
i
A
A
A
A"
A"
B
C
_.
W-
LtJSt.
ilGHA
*
*
*
*
ป
h
*
i-
r
T
i
T
23-<5
DESCRIPTION
1
: FIXED
WRITE IN
23-36
!
. 7
1
i
1
i
1 i
!
i i !
i i _ ;
i
i i
i
i
l
!
i
t \
r !
i
.
!
t
j
i
l
-H
...
,
|
1 '
i
!
i
1
1
i
1
i ^
i
I
i
]
! i
I
i
i
i i
; i
...
; i :
;
i !
!
i
1
~
i !
1
' ;
\ i
*
T1GK'
f
.Ff
ICAL
j
1
%M?
TYPE
UNIT
HP
L'HR
UNS
L'NR
USK
UNR
KVA
KVA
KVA
USR
HSR
UNR
UNR
UNR
11NR
MR
CY
CY
CY
-f
LB
QUANTITY
39-45
1
1
l
i
i
1
GH !-l
TON
TON
X
/t
i
'
I
i
T !~
i
i i
I
\
i
\ :
i
W''?ww%
^
''/
f
DATE
46-74
%.
1
MATERIAL
54-60
4
2
2
i
z
4gd
WSlAQ
9j^{O
XAQ
i
!
I
|
4i<>0'0
i
)
(
1
!
i
i
i i
1 * i
/ooc
1
; i
I
i i
/i o. cj e
"" ! !
' !
i
i ! ' i
i ! i :
^5fc
S
46
_
1 1
'mzzjmzki
^^
^^
SUBCONTRACT
!
54
GO
!
J
j
i
i
f 'cC75-'gp'
i . . ,
ill !
* \.
_....,_.. ..4-r
^L
" l
!
LA33R
68-74
"1 i jfrj\A
, :24^lio
i
{
. :
0
o
i i /'j4-id>b
; r : s
: i i
l : l
1 Li_ ; !
i i j
i
i
i
i
; j
!
i
i
t
{
:
i
.
;
i
i
i
1 i '
l
|4j^j<9;ob
! ! 1 1 ;
' i ' '
; i i
i , ]
l : I 1 '
' i i t 1 '
!
1 i
''''.
i i
i
i
j
i i i !
i i
'' i 1 !
' i ! '
: i 140.0
'J H
! ^ i
_i : ;_ U
i j i : i '
*
o
< i ] l *f o \c \o
\
i
--r
t
: ' ! !
! i '. > i
! '
j ;
!
i
' 1
yk^XZyZZt
'.
<
\ . ;
j ' !
1
~1
"I
|
--i
'' ^rs^-:. **'.-''*. ^'.-'^^t^l
x*i^ki.!:uliJ a^i^'li-jj^j
!/.a:3-fo-oi
.K'-iT CF__
i
I
-------
CC1
ESTIMATE/JOB NO. -*
SEQUENTIAL
PIECE* *
ecu
10
FIXED
- ^i
.^
SUPPORT SUPERSTRUCTS
PI
L L FOR TWRS.
PIPE SUPPRTS. &
&
VESSELS
RIGID HGRS.
PIPE RACKS
STEEL .DAVITS
JIB CRANES
MONORAIL (INCL.
STRUCTL)
ELEVATOR STRUCTURES
STEEL DEMOLITION
STRUCT. STL. SUBCONT.
SUB TOTAL - 18
TROLLEYS & HOISTS
LG
LG
LG
. NON-BH. SLABS
(FORMED)
.RON-BH. SLABS (N/FORHEO)
BEAMED TYPE
SLABS
FTG. & PIERS FOR STR. COLS
MULTILEVEL SUPERSTRUCTS.
I-LEVEL SUPERSTRUCTS
FIREPROOF STR.
STL.
PAINTING-STR. STL
^
W////////M
w,
fm
TOTAL
CODE: 1800
li^ymAOfe DETAIL ^IHIEET
CC2-6
0
CODE-*
7
1
(
8
\
AREAH
9 1
> O
0
9
ITEM DESCRIPTION
17-22
1
B
0
1
*
ป
23-45
S
C
' 8
J
tranjKCT
17-22
1
1
1
1
1
1
2
B
8
8
8
8
8
2
7
7
7
7
7
7
9
3
U
5
0
0
1
0
0
0
0
0
1
1
1
0
0
3
0
7
9
0
5
1
1
2
3
0
1
2
1
1
B
C
D
A
A
9
*
*
*
*
*
*
*
*
*
*
^
*
yyy>y>yyvvyyyyy>vyvv
Q
a
/
A/
S,
j U i
?
E
mm
WRITE IN
23-38
ft
fa
A
L
P)
H
H
G
L
ie
L
f\
/
e
V
tf
/?
A
r
"
'4%
'/$a
L
C
^
D
y
ft
D
A
c
14
,
,
4
T
D
1
Tl
%
jd
W
/
o
T
s
s
ฃ
ft
fS
rr
/Y*
r
r
7
/V
f"f
r\
s
/
ti
S
L
I
/
<7
C
0fef
?wv
/
T
T
,
t
L.
OJ
K
&
fa
$
L
*
/
o
m
i
c.
1
'M
t
/
g
>
f\
1
ft
ft
A
<
^
ft
2.
'//<
-tA
/
4
Q
ฃ
ft\
ft
ft
o
A
/.
^
#
#
&
f
-------
15021-271
SUB-SUMMARY
I'STflBEB
* LOCI I i OK
'*' CODE
^Ol DO
: 0200
1 * 0400
1 0500
0600
T 0700
1 0800
0900
T 1000
1100
1200
2500
[ 2800
1 2900
3000
F3IOO
J200
ซr- o400
r
1300
1400
1 1500
*" 1600
1700
1800
1- 1900
2000
2100
_. 2200
3309
2400
2600
2700
3300
3500
3700
^00
DO
(300
SI 600
00
7100
CAJ^/iKoOisAeiJrAL flec/reeno/J AGE/OCV wimKM.4/l40toeKM?' n)
i?/jฃuAfli - KJoR-ru CAROL i/oA
DESCRIPTION
FIREO HEATERS AND BOILERS
5&5S& /3f? f/P^A//C OHL\f 1> [
SEWERS 1 ^
INSTRUil!NTATION
ELECTRICAL
CONCRETE 3%l ***_j
>y
42 ooo
/SpOOO
/ฃ. &ฃ~0
// 7^o
41.Z.OO
3.2&0
I?59Z,36>0
PปTF
Pier or
LABOR
100.000
2.^000
8,400
/3^,400
f &Koup~ni
22^000
/f'JoOO
kL^ZOO
49J&
94 /tOO
/B O4o
-^
35,590
SUBCONTRACT
.ซ
PiPlrtA \
V
.
-------
.'1
CC1
ESTIMATE/JOB NO.
MftHCtiTIAI. CC11-18
PIECES
FIXED
- ป. ^
STEEL STACKS
OlAdETER
HEIGHT
LINING FOR STEEL STACK
BRICK STACKS
imtJETER
HEIGHT
SUB TOTAL - 0201
FON. FOR STACK
FIREBALL fl FOOTING
FIREBALL QO/FOOTING
PAINTING
"~
f
-e>
6STIWIAII6 DtTAI
CC2-0
4H /
9
4
0
CODE -o
7
0
C
2
iL SIHfeiT
AREA-c
8 1
0<
0
f
ITEC3 DESCQIPTIOtl
17-22
0
I 0
1
*
f
2345
B
R
'El
ฃ
cf
tf
/
H
*
f,,,
LINE DESCmPTtOa
17-22
1
1
1
2
_
r^
f 21
f 2
3 0
2
1
A
A
A
B
C
C
C
9
A
A
A
A
*
A
B
*
*
A
8
9
*
*
*
*
HRITE IN
23-39
(
&
A
H
i
5
/
V,
fi
V
ff
/
L
r
/*
/
u
ฃ
A
0
/ฅ
pi
p
ฃ
c
T
A
T
C
t
t
T
S
7
\
/
P
FiXEB
TYPE
UNIT
LB
SF
n
CY
cr
CV
SF
QUANTITY
30-45
^
/
--
/
^
f
r
0
~
.
T
T
H
A/
. -. ... - -
4M>
DATE
46-74
p
iW^
MATERIAL
54-60
7
|
V0
4
9
ซ
rtป
0
^
c>
0
^
0
(?
'
*
^IH
ซ
-(
^
1H
MB
^*t
0
0
fflHX *ซ"
if riii
mmmmmmmmmmmmmm%mmm%m^
U-
r
^^^^^^^^fฃ^R^f^^^^^^^Jfl^^%#s%Y/&,Y/utity//////////,fry/J^^
COOE: 0200 OESISMATION: STACKS-SELF SUPPORTING
i
'4%?
^
7 4 oo]O
1
S
40
^
m
%
^
^^
SUBCONTRACT
54-00
ซ
^
%
^*
ซ
rfn
I^M
II-
ซ>
fa
o
e
ป,
ป *
0
$
ซ
MMl
^
i
1
&
^1
ซ*
ป*
IMSB
IปT
J
5^5
w<
CC75-00
i
L
i
i
LABOR
60-74
ป**
ff
?
ซ*
*
o
o
i
^4 coo
0 "^
^^fe
/ 1 ^?
/ ,ai
^^
flood
SHUT / OF /
-------
-fe.
UJ
CC1
!
!
tdllMAIt UtIAIL Mlttl
ESTIMATE/JOB NO. -*
tEiUCMTIAL CC11-H
MECEf C / 0 / A b
FIXED
*. *. ป.
EIGHT
TYPE
#/HR
SCFM
DESIGN SUCT COND. OF
PSIG
DISCHARGE COND.. OF
PSIG
RECIP. STAGES
DRIVER
MOTOR HP
TURBINE/C BHP
TURBINE/NC BHP
GAS ENGINE HP
GAS ENGINE RPN
GUARDS FOR CPLG. & MISC.
SUB TOTAL - 1001
FOUNDATIONS
INSULATION
PAINTING
CC2-8
4\ /I?l4lo
CODE-*
"if"
Id
1
AREA-* 0
11
4
ITEM DESCRIPTION
17-22
i ฐ
0
1
#
#
23-45
ฃ
c
> t
Li
r1
3
X
.
0
t
F
A
LINE DESCRIPTION
17-22
1
2
2
1
i
1
7 0
I 0
3 0
8
1
1
A
A
A
B
B
B
B
B
B
B
B
C
C
C
C
C
C
D
9
A
A
A
*
A
B
*
A
B
C
D
E
F
G
*
A
B
C
D
E
*
9
*
*
*
...
1
'00%%^^
TOTAL J
WRITE IN
23-36
E
M
6
$
s
E
u
o
A
i
r
C
\3
Q
.
H
F
t,
0
ฃ
w
|
*
*
O
3
i
&
P
0
i
H
P
o
f^
C
:,
e>
^
C
S
/
g
\ฐ
/Y
0
g
1
\
-
^
%
...
.._!
r
0
t ;
o
F
/o
2.
ฐ
c
-r
C
o
a
X
f=
o
' . ' i !
t . ; s
! I
. i i 1
i > i i
$M\
W0,
ft
fa
ffiftft
^
f^f
^
ft
h
M
ti
h
Tfljt
4
>v
ft
v<
c
p
p
&
n
p
h
N
s
V
FIXED
TYPE
UNIT
LB
CFM
LB
UNR
CY
SF
SF
W&
Wj,
COBE: 1000 DESIGNATION: BLOWERS & COMPRESSORS
(
4
QUANTITY
31-45
%
2^
^
^
^ O
3
o
2
Z.
o
ฃ"
O
0
0
0
j
^
\
w<
wt
8
5>
DATE
46-74
m
MATERIAL
54-60
f
fa
3
//
2
z
2
L.
7
3
o
,
c
7
2
0
0
A
ฃ
\c
0
C
:
!
; ; |
1 ' i
#
4
$
2,
j_ ;
9
%
f
O
S
46
-90
^
P
SUBCONTRACT
54-60
v
e
a
i
,
;
o
f
-
_Li 1 J
1
1 !
[^
*n
-
fa
^
_
ซ
fy<
CC75-80
^
i
L
k
LABOR
66-74
^
i
i
i
i
M
3
;
i
(o
b
t
#
j
0
f
4
C
ฃ
C
*
i
f;
.0
o
C
O
Tf
0
SHEET / OF /
-------
I
eci
s
(
ESTIMATE/JOB NO.
EtABKOTlAI. CC11-10
Wttff * S / O 5 A b
FIXED
< - ป
SUB TOTAL - 1201
FOUNDATION
FTGS. 4 PIPERS
SMALL SUPERSTRUCTURES
OUTSIDE PAVING
STRUCT. STEEL - OTHER
PLATFORMS & LADDERS
JIB CRANE OR DAVIT
SPEC. STLL SUPPTS., ETC.
FIREPROOFING: TYPE. THK
FIREPROOF ING. TYPE, THK
INSULATION
PAINTING
PAINTING
sdiiwtADฃ ygy^
CC2-0
317
m
o
CODE-^
7 0
1 2
\l
III aH66T
AREA-t
0 1
>O,
9
4
ITEQ OESCQIPTlOtl
17-22
1
2 0
1
#
tt
23-49
V
e
A/ r
U
*?
/
ฃ3
AM
PS
ซ
LK1E DES^OtPYI^fl
17-2
1 '
1
1
1
1 [
1 f
1 f
1 i
1
1
2
2 ;
2 ;
f 0
1 }
1 1
f 2
1 0
1 0
) 0
) 0
j 0
} 0
I 0
! 0
1 0
8
0
2
4
1
3
9
9
1
1
1
1
1
A
A
B
B
C
C
9
A
A
A
A
A
A
A
B
A
B
A
A
B
*
A
*
A
*
A
9
223&%22%^^
TOTAL
BQITE in
23-30
?
H
ft
"/<
A'
/c
(a /
s i^
^
\ A
ป<-
'
3
/
W
i.
7
?
A
ฃ
^
'
"
C
r
f
-
r
^
\'ti
w
ft
ft
L
L
X
tf
^/
.
o
&
A
^
/?
(/
/
r
/
i
i
1
!
Mf
v iงi
G . i
0 ฃi
A
i ..-.j i ., . ; , ..
^
i
^
ft
ft
V.
i
kM
) a >
=
r '
L
\ %.%
ft
&
* \
FtKEB
TYPE
pT
ONR
UNR
UNR
CY
CY
CY
CY
LB
LB
LB
LB
SF
CF
SF
TON
TON
4
QUAttTITY
30-49
^ JL
mtgz
%
^
CUBE: 1200 DESIBNATIOtt: MISC. HECH. EQUIPMENT
m
ซjf
0
-?
^
ft
tf
^
R
ฃ
^
%
q
2
jX
^
DATE
40-74
i^
^
'',
^
. MATERIAL.
54-60
ft\
/
/
f
o
o
j
i
i
4
D
*
\ \
ft
ft
Mffik
^
?
Mi
s
48
^
V
'm,
%.
^
SUOCOtJTRACT
54-88
eป
M^
0
ft
'/dfa
._
)
PI
Nivi
~1~
%
i
mU
^f^
T
CC79-00
! I
i
i
ฃ
1
i
i
LABOR
60-74
>x
^
j
2
--
ft
/
>
^?
O
C5
I
1
-J
i
*
1 ' I-1
f SHEET / OF 4 I
-------
-fe.
cei
s
i
ESTIMATE/JOB NO. ->
tEMEMTIAL 6611-11
HCEf S / 0 -| |A T>
FIIEI
. ป -
SUB TOTAL - 1201
FOUNDATION
FTGS. I PIPERS
SMALL SUPERSTRUCTURES
OUTSIDE PAVING
STRUCT. STEEL - OTHER
PLATFORMS * LADDERS
JIB CRANE OR DAVIT
SPEC. STLL SUPPTS., ETC.
FIREPROOF ING: TYPE. THK
FIREPROOF ING TYPE. THK
INSULATION
PAINTING
PAINTING
C3MMAII: UfclAIL DMttl
CC2-I
4
/ 1^141 o
CODE-*
7
1
1
2
\
AREAH
\ \
* o
0
4
ITEM DESCRIPTION
17-12
1 '
I 0
1
*
*
23-45
S
?
' -/
c/
ฐi
s
&
D
/)
rtP
ฃ
^
LIME lESCWfTIM
17-22
'
"
I
(
I
1 1
1 <
1
2
2
2
f 0
F 1
f 1
f 2
ป 0
1 0
) 0
1 0
8 0
9 0
I 0
) 0
3 0
8
0
2
4
1
3
9
9
1
1
1
1
1
A
A
B
B
C
C
9
B
A
*
A
*
A
9
W/////////////////^^^
TOTAL
WRITE IN
23-31
H
-l
$M.
ft
a
i
,
3>
M
^
%
L
5
'/
fr
e
ft
h
L
"
2
rl
Q
r
t
^
%
%
r
X
W
w
ft
ft
/
6
A
^
N
f
T
f
^
ฃ
O
0
/
ft
,
R
A
ti
h
r
ft
y
^
^
/>
tf
!
m
^
ฃ (
pixta
TYPE
UNIT
UNR
UNR
UNR
CY
CY
CY
CY
LB
LB
LB
LB
SF
CF
SF
TON
TON
'////. %.
'00h%
. 4
QUANTITY
3 Ml
4
hty.
^
^
/?
ft
f
^
^
S?
^
i4
DATE
41-74
MATERIAL
54-16
#
%
/
7
fa
7
o
4
o
C
'/flfo
T
s
41
-
y///s
SUUOMTNACT
54-M
0
S i
1
i .
Kffl
T
1
!
^
ft
CC75
1 1
t
t
H
I
\
\
LABOR
1174
yj
#
//.
^
^
/.
^
o
&
1
o
o
Vf
COIE: 1200 DESI8NATION: NISC. MECH. EQUIPMENT & f SHEET a. OF 4 L
-------
CC1
ESTIMATE/JOB NO. -*
SCOUEtlTlAL CC1MO
PIECES G / 0 2. A
P
FIXED
. ซ. ป.
SUB TOTAL - 1201
'
FOUNDATION
FTGS. & PIPERS
SHALL SUPERSTRUCTURES
OUTSIDE PAVING
STRUCT. STEEL - OTHER
PUTFORHS & LADDERS
JIB CRANE OR DAVIT
SPEC. STLL SUPPTS., ETC:
FIREPROOFING: TYPE. THR "
FIREPROOFING: TYPE, THR
INSULATION
PAINTING
PAINTING
ESTIMATE DETAIL SHEET
CC2-0
4
/
?K
0
CODE -o
7
> 1
8
2
AREAH
0 1
>0'
0
f
ITEU DESCRIPTION
17-22
1
2 0
1
#
#
23-45
F
:/
\W
D
A
n
P
E
S
LINE DESCRIPTION
17-22
'
(
i
i
I
2 ;
2 :
2 :
L .
r o
i i
f i
1 2
} 0
) 0
1 0
) 0
1 0
3 0
I 0
) 0
1 0
8
0
2
4
1
3
9
9
1
1
1
1
1
A
A
B
B
C
C
9
B
*
A
*
A
*
A
9
*
*
*
*
*
*
*
*
*
*
*
*
*
*^^^^t^!^^^^^^^^^^.^^^^
F
TOTAL
C03E: 1200
1
WRITE IN
23-36
O
*
P
1*1
Ui
ฃ
P
u
/
/
%
$
o
L
A
C
7
1
s
T
C
'
'
e
IT
r
r
r
D
-
(j
X
w
*
L
A
G
^
O
T
/
L
U
0
o
/=
i
AC
v f
ff
/ft
> ฃ"
* E
1
I
;
~TT~~ ~
DESiSWATICM: HISC. KECH EQUI^ENT
_. .4._
f 4
FIXED
TYPE
UNIT
UNR
UNR
UNR
CY
CY
CY
CY
LB
LB
LB
LB
SF
CF
SF
TON
TON
QUANTITY
39-45
^f
/f
!
ฃ
DATE
48-74
%
d
fป
^ 55? 5
^
MATERIAL
54-60
''***"'%? ^y^
.-
/
-
/
f
1
0
4
o
0
i
$
y?//*
'i'
- -\
CC75-80
j
Sf
t
L
L
\
LABOR.
68-74
ฃ
/
/
ฃ-\
&
''' ''''/.
\
~.
\ IMU J :.- 4
/z^c> f< &ROUP _
X
I
sz
G
c>
T"
rm
-------
-U
CC1
EdllMAIfc UtIAlL 5Httl
ESTIMATE/JOB NO. -*
SEQUENTIAL ccii-18
PIECE! - G 1 0 5 A D
FIXES
ป ป ป
SUB TOTAL - 1201
FOUNDATION
FT6S. & PIPERS
SMALL SUPERSTRUCTURES
OUTSIDE PAVING
STRUCT. STEEL - OTHER
PLATFORMS & LADDERS
JIB CRANE OR DAVIT
SPEC. STLL SUPPTS.. ETC.
FIREPROOFING: TYPE. TKK
FIREPROOF ING: TYPE. THK
INSULATION
PAINTING
PAINTING
Ws
CC2-8
-fl/
m\o
CODE-*
7'C
Tff
AREA-i
ITEM DESCRIPTION
17-22
i ;
I 0
1
a
*
23-45
B
X
P;
^
s
s
S
ฃ
a
.o/>
;
D
LINE DESCRIPTION
17-22
-
"
1
1
i
1
2
2 ,
2 .
r o
1 i
i
1 2
i 0
1 0
i 0
1 0
\ 0
\ 0
I 0
} 0
3 0
8
0
2
4
1
3
9
9
A
A
B
B
C
C
9
A
A
A
A
A
A
A
B
A
B
A
A
B
*
A
*
A
*
A
9
jZ88%8%!08308%838^^
TOTAL
WRITE IN
23-38
f
H
^
8
4
1
/
3
.0
ฃ
^
T?
O
0
7
/
/?
^
/}
L
/
//
H
^
?fe
z
T
A
e
^
^
/
i
x
W
ป\
-
T
^
ฃ
-
tฑ
r
w
m
i.
L
/
V
%
o
0
A
^
ฃ
u
t
r
F
ff
%
/
V
e
/
h
A
R
/\
K
Y/<
D
e
fr
ฃ
^
_X
m
&
V<
* y
8 1
0'
0
4
FIXED
TYPE
ONIT
UNR
UNR
UNR
CY
CY
CY
CY
LB
LB
LB
LB
SF
CF
SF
TON
TON
'&&
'/t
w//<
CODE: 1200 DESIGNATION: MISC. MECH. EQUIPMENT
C
> A
M
f
ek
QUANTITY
39-45
^
#
%
4
R
v^fVxyx^
6
w
mm
$
#
k
DATE
48-74
i
H
II
MATERIAL
54-60
^
'd
/
#
^
<^
7^
ฃ
^
fl
O
^4
^J
r
ฃ.
O
C
ft
%
M
s
46
^
m
N
IK
^
W
^
SUBCONTRACT
54-60
^
^
f-
^
ป
k-
MW/',
M-
CC75-80
1 1
t
*
i
>
LABOR
68-74
'M
'/<
2.
&
9
/
/
o
/
C7
^:
O
O
^
c?!^<3
SHEET 4 OF 4-
-------
CC1
tSMMAIt UtIAIL SMttl
ESTIMATE/JOB NO. -*
SEQUENTIAL
PIECE #
CC11-1I
FIXED
_ .- -
INSTRUMENT BOARDS
BD-MTD. INSTR. -
ANALYSIS INSTR
ACCESS
. FLO
FLOKf INSTR. FLO.
LEVEL INSTR. FLO.
PRESSURE INSTR
. MTO.
MTD.
MTD.
. FLO
TEMP. INSTR. FLO.
HEIGH INSTR. FLO.
. MTD.
MTO.
HTD.
COMBUSTION CONTROL
- PK6D.
CONTROL VALVES
SLIDE CHOPPER
PLUS
VALVE POSITIONERS
VA
BUTTERFLY VALVES
RELIEF VALVES
1
.A. FILTERS,
.A. TUBING &
REGS.
ACCESS.
FITTINGS
.A. SUPPLY
.A. CHANNEL &
INSTR. PROCESS
SUPPTS.
PIPING
INSTR. HOUSINGS
INSTALL. CALIBRATE.
ST-UP
INSTRUMENTATION SUBCT
SUB TOTAL - 1500
FTGS & PIERS
CURBS & LEV RAIL PANEL
PIPING 1MSUL.
11!
ITF
R'Zv
PAINTING - EQUIP.
PAINTING - FIFE
CC2-6
4-1 /
9
A\fl
CODE-*
7
1
a
5
AREA-*
ITEM DESCRIPTION
17-22
1 I
i 0
1
*
9
23-45
e.
F
ป/
\
/
N
S
7
ซlu
^fe
M
LINE DESCRIPTION
17-22
1 5
1 J
1 !
1 !
1 I
1 !
1 '
1
1
2
2
0
) 1
i 1
5 1
i 2
5 5
1 \
1 }
? 0
3 0
3
1
6
8
0
0
0
0
1
1
3 0|1
i
' }
A
B
A
B
C
D
E
F
6
A
B
C
D
E
A
B
C
D
A
B
A
A
9
A
B
A
A
B
9
*
*
*
*
*
/525%%2^/ฃฃ%222^^
TOTAL
C00ฃ: 1500
WRITE IN
23-38
^ ' !
i^
K
fa
k
rt
%
M
&
fy
w
ww
j
>
%
W
w
fa
\
$
i*
j
w&jQC&(C&
WM
T
A
9 1
ปe.
0
^
FIXED
TYPE
UNIT
LF
NO
NO
NO
NO
NO
NO
NO
NO
NO
NO
NO
NO
NO
UNR
UNR
UNR
UNR
UNR
UNR
&MC
UNR
CT
CY
IF
TON
TON
^
4
DESIGNATION: INSTRUMENTATION
^
i
10
N
QUANTITY
39-45
V
o
7
\
^
ป
J
,v
H
ฃ
ฃ
tt
Y/<
^
^
s*
^
5-
A
L.
(S-
ffl
%
L
'ft
t
.
dr
r&
_
f%
DATE
48-74
ny/
if
y*
<4
MATERIAL
54-60
1
^
w
ฃป
i
2
0
$
0
S
(a
i
7
0
0
^
o
(?
0
a
o
o
o
q
T-t-
i ซ-
I :
! I
ฃ 12. 'o bo
^
^
s
46
^
*
^
9
SUBCONTRACT
54-60
>1
]
1
I
A
\
1
m
,
A
n
' n
-4 r '
> -
MX
-j *
; ! .
1 r 4 f
" ' r !
|
wffiffi/Zffix
[ T
CC75-80
t
4
L
1
LABOR.
68-74
Y/t
^
g.
,
r
fซ
r
-..i-u
-1
#
^
fy
ป *
S's.ob
SHEET / OF /
o
-------
CC1
t^llfVlAlt UfclAlL SHfctl
.
CC2-6
ESTIMATE/JOB NO. -ป^ri^l4-
SEQUENTIAL
PIECE* -
ecu
j i
-It
FIXED
- -
MOTOR CGSTF.OLS
POKER KIR IKS
LIGHT-SO SYSTEM
GROUNDING SYSTEM
TELEPHONE i CCWWN. SYS
ELECTRIC TRACING
SUBSTATICHS
IKSTRWENT U!R!S3
GEHL. ELECTRICAL SATL.
ELEC, SUBCONTRACTS
TE*?. P i L HATIS. CCCO.
FOUR SILLS
TEMP. P & L SUBCOHT.
SUB TOTAL - I5QG
MISC. ELECT. Sll?PT. FTGS.
0
JCT ENC*SE*EHTS
ELECT. NANHSLES
STPUCT. STL. FOR SUFPTS.
FAINTIKG - SIR
PAIKTlHG - ECU
pm'TiNG - CD*
* ::
-mmzi
'.E: :?:n
J"T. ST
IP
"..'IT
DTAl
I.
-
--
0
CODE -*
7
1
i
8
1 AREA-*
9 110
&A"
ITEM DESCRIPTION
17-22
1 6 0
1
#
#
23-45
1
LINE DESCRIPTION
17-22
i
.
HTFO
1 8 0
i
\
2
5
..
i
i _
\ jBIGis
1 6 0
IjBjl
1
9
o
j
! i
1 i 7 ; 1 '.
i ' 7 2
i!7 2
! 3!Q
L j ' w
213 0
2 ! 3 ' Q
C
5
1
i
1
1
1
"
C ' '
'.'.'. ' f"
A
A
B
C
0
t
A
3
C
A
A
A
e
*
*
*
*
*
*
*
*
*
*
*
*
*
A *
8 *
C
*
i
3
9
> *
n
A
Jl
*
*
.ป. *
A *
B
C
*
*
!
k
WRITE IN
i
23-31
.
i j
i
! L
i
i !
,
1
i
i
I 1
1 ;
|
!
;
j
[
*
i
j
I
. u .
.
, i
i I
I
! ;
; ; ;
; i i ; i i :
i
i
i !
. ; | ; ; ; i
- ''',' ''*'''/ S~' ' f s '''/
lit < !Ct IT'TJ-
U ป. w i c : i A i : ^- n .
i i '
ป;
I
FIXED
TYPE
UNIT
HP
UNR
UNR
UNR
UNR
l!NR
KYI
KVA
KVA
UNR
UNR
UNR
USR
UNR
UNR
UNR
CY
CY
CY
L3
i
ON
TON
TOM
"*7
P-
i
QUANTITY
35-45
.i
!
\
i
i
1
t
: 1
1
1 1
i
1
<
1
' i i
i
I :
%ฃ$''''%%''
*'''$&%&&
'/"''
DATE
46-74
'/J
n
fy
MATERIAL
54-60
MM
I
M~
ซi
Ml
<
^
^
MM
M*
M*
r "i
!
\\
1*
r -
-.
z
i
... i
^
/>
0
0
M*
MM
M*
O
f>
0
a
6
1
I
\
\
I
y
0
i
e
t
/oio
i
\ i i
' ' i
s
48
MM
S'JBCON
^
w
f*t
^
VCT
54-60
1
i
i
i
t
i ; '
r
i
1
; '.
i
i
; i
i i i
I ';r"7f; 60
fT T~~
LL_.;..JJ
.! i
i \
LABOR
S8-74
-_|, ..
ifiloo
\ i' I '? oo
C. 4 ....
"* 4 +-
-1
, ^"
i i
\y0*
i *~
i
!
; ; i i
![.;
i i i
> i
' i .
1 i '
i i 4OO
1 : i
* " :
; i
1 j
1 .
i :
i
:
1
I
i ..'; ,1- . J 4 .
M ; 4jao
J i : ' ! =
i . '' \ : ' i ,
' ' t (
: i
; i
j . ' ' ;
&z?^tm:-.
/5Z<)'6
._...
'. .'1
"-*..ป
ELECTRICAL . SHJ
:-i
' .' . . - \
/ k4C &
ET V, }
-------
CC1
fc^llWWAOfi: UblAIIL bHbfcl
ESTIMATE/JOB NO. -*<
SEQUENTIAL
PIECE *
CC11
-16
FIXED
i .ป ป
-*
SUPPORT SUPERSTRUCTS
P 4 L FOR TWRS. &
PIPE SUPPRTS. &
VESSELS
RIGID HGRS.
PIPE RACKS
STEEL DAVITS
JIB CRANES
MONORAIL (IHCL.
STRUCTL)
ELEVATOR STRUCTURES
STEEL DEMOLITION
STRUCT. STL. SU3CONT.
/ป//*'ฃ" ftACK
SUB TOTAL - 18
TROLLEYS 4 HOISTS
LG
LG
LG
. NON-BM. SLABS
(FORMED)
.NON-BM. SLABS (N/FORHED)
. BEAMED TYPE
SLABS
FTG. 4 PIERS FOR STR.
COLS
MULTILEVEL SUPERSTRUCTS.
I-LEVEL SUPERSTRUCTS
FIREPROOF SIR.
STL.
PAINTING-STR. STL
.
w>
^
^
^
M
TOTAL
CC2-6
*
/
?
^
/o
17-22
1
8 0
1
# S
s
Ju
>F>
CODE-*
7
1
\
8
AREA-t
ITEM DESCRIPTION
23-45
EJ
*
S
"HUE dCSSCKIPTTg
17-22
1
1
1
1
1
1
/
2
e
8
8
8
8
8
f
2
1
7
7
7
7
7
9
3
i
U
5
0
0
1
0
o
0
0
0
0
0
0
3
0
7
9
0
5
7
1
1.
2
3
0
1
2
1
1
i
B
C
D
A
A
/}
9
*
*
*
*
*
*
*
*
*
*
y
*
*
*
*
*
*
*
*
*
CODE: 1800 -
T
R
u
//
7
C/ )
f '
er
ir -
WRITE IN
23-38
f
^
Y
A
L.
M
H
H
6
L
$
o
L
A
E
V
K
R
fr
rr
/?
%
ti
d
I
c
(S
P
y
A
P
A
C
V
(
t
r
D
\
0
I
o
T
$
;
E
R
3
\
/v
a
T
T
71
^
^
s
g
^
L
L.
A
Q
ฃ
/
r
r
f
^
t.
u/
c
i
i !
1 i- | ; '
^d
^
W
fyfafa
&Zu&u.
^
fe
^
^
.
/
Jt
0
^
/
/
^f
1
/
tf
ฃ7
7
A/
1
A
4.
4
4
ฃ
G
4
O
ฃ.,
%
0
*
ฃ
L-
*t
*+
/-
^
9 1
*O'
0
f
FIXED
TYPE
UNIT
LB
IB
LB
LB
LB
IS
m
Ml
LB
LB
Lฃ
NO
CY
CY
CY
CY
CY
CY
CF
TON
HI
DESISNATIOW: STRUCTURAL STEEL
8UAHTITY
33-45
2-
2
/
tf
4,
7
^
f
A
ฃ
I
z
6
2
0
5"
?,
?
tf
7
4
5"
O
0
iT
0
2.
^
MMl
O
C?
L.
S
L
(3
0
6
O
o
o
o
A
F
f=\
0
V
o
1
%ฃฃ
M
DATE
48-74
{&.
^
^
^^
<4
MATERIAL
54-60
^
2
2
4
/
O 0
2
6
&
2
.2
,7
?r
4
5
2
5
*\=.
5
i
5
I4
4
O
O
O
(0
0
0
ฃ
0
o
0
o
O
o
c
0
o
c
0
c
-'
0
c
; I
. 1 j. ,1,
^^^
Vl2.i4f.JO
^
s
46
'*
-
~%W
i
*
^
HP
^
SUBCONTRACT
54-60
*
0
~
1
' iii
i
i
\ \ \
h
CC75-80
t
ฃ
i
LABOR.
68-74
/
2
2
I
^
1
o
o
-2
/
5
O
o
2
o
ff
7
/o
^^1
?
2.
/
c:
O
L^
O
i
c
c
.T
5"
(^
o
o
o
o
o
o
o
o
0
o
0
o
! ' '
%ฃ%%&%%
^
i i^ocft^
SHEET OF
g
-------
021-271
3T - ReHe*+
1
SUB-SUMMARY
]" ^
1 USTOMER
IOCITION
ฃMv/iROkJMeiOTAL FfcoTBcriOfJ A&eTJcV ESUMTF MO. tnj'jfow tJn.n]
VnRi\/\M . KJ.o^r/-! <:XRซL;MA
_ CODE
O'OO
: 0200
6400
0500
!. 0600
~ 0^00
0800
1 0900
r 1000
; HOD
1 1200
- 2500
2800
2900
_ 3000 '
i 3100
i 3?00
-.'
'"" -400 .,in
i :
L
! 1300
i UOO
1500
, 1600
.' 1700
, 1800
1900
2000
2100
i- 2200
i 2300
2400
-2600
2700
i 3300
3500
3700
-^1800
DO
(300
rdOO 1600
JflbY
2100
DESCRIPTION
FIRED HEATERS AND BOILERS ( 4~]
STACKS
REACTORS AND INTERNALS
TOWERS AND INTERNALS
HEAT EXCHANGE EQUIPMENT
COOLING TOWERS
VESSELS. TANKS. DRUMS & INTERNALS
PUMPS AND DRIVERS M")
BLOWERS AND COMPRESSORS
ELEVATORS. CONVEYORS. MATERIALS HANDLING EQUIP.
MISCELLANEOUS MECHANICAL EQUIPMENT
TANKAGE . ( ')
FILTERS. CENTRIFUGES. SEP. EQUIPMENT
AGITATORS AND MIXERS
SCRUBBERS & ENTRAINMENT SEPARATORS
MACHINE I.-JlS & MACHINE SHOP EQUIPMENT
HEATING. VENTILATION. AIR CONDITIONING.
OUST CONTROL (Process only)
PACKAGE UK ITS
SUB-TOTAL - MAJOR EQUIPMENT
PIPING
SEWERS
INSTRUMENTATION
ELECTRICAL
CONCRETE 4ฃ" Cy
STRUCTURAL STEEL
FIREPROOF ING
BUILDINGS
SITE DEVELOPMENT
INSULATION
PAINTING & PROTECTIVE COATINGS
FIELD TESTING
CHEMICALS AND CATALYST
PILING
FIRE PROTECTION
MISCELLANEOUS FURNITURE FOR PLANT BUILDINGS
SUB-TOTAL
MISCELLANEOUS DIRECT CHARGES
STOREHOUSE ACCOUNTS
CONSTRUCTION SUPPLIES & PETTY TOOLS
TESTING WELDERS
TEMPORARY PIPING & ELECTRICAL FACILITIES
TEMPORARY CONSTRUCTION BUILDINGS
TEMPORARY SITE DEVELOPMENT
~ TOTAL DIRECT COSTS
MATERIAL
JSL^OOO
770
/s^nio
S^foo
^C, 000
9 Soo
rt4oo
Z.tVO
ซ
AO7O
'/t>0
4^4 oo
21^380
nซTF
PiP.F OF
LABOR
7^200
^1o
/3^ฃ?o
/ฃV200
/s?jOOO
/S-JLOO
7\b40
/934o
.
4^2X0
**2.0
400
72,6>50
SUBCONTRACT
LZ^oc
^ฃ"00
33.OOO
IOI&OO
-------
-------
n*cT
ESTIMATE DcTAIL SHEET
-------
CC1
ESTIMATE DETAIL SHEET
ESTIMATE/JOB NO.
$!
-------
CC1
t^MMAItUtl AIL Ml 1 1 T
ESTIMATE/JOB NO. -ซ
SEQUENTIAL
PIECE #
CC11-18
V 1 0 ฃ
FIXED
- .. ,.
CAPACITY
WEIGHT
DESIGN. OF.
PSIG
SHELL: DIAMETER
LENGTH T TO T
THICKNESS
PL SPEC
HEADS: NO.. TYPE
THICKNESS
SUB TOTAL - 2501
SLABS & PEDESTALS
SADDLES FOR HORIZ. TKS.
CONG. TANK RINGS
SUPPT. SUPERSTRUCTURES
PLATFORMS & LADDERS
FIREPROOF ING: TYPE. THK
INSULATION: TYPE. THK
COVER
PAINTING-STRUCT
PAINTING-TANK
. STL.
CC2-8
4
ft
A
0
CODE-*
7
2
\
5
AREA-*
1 1
o.
1
5
ITEM DESCRIPTION
17-22
2
5
0
1
#
#
23-45
f-
L
i I
-. L.
o
/
L
3
7
c.
> K t
\
LINE DESCRIPTION
17-22
1
1
1
1
1
1
2
2
2
2
7
7
7
8
8
9
2
2
3
3
0
1
3
0
0
0
0
0
0
0
5
5
6
1
3
A
B
B
B
B
B
B
B
B
9
B
*
*
A
B
C
D
E
F
G
9
A
*
*
w////////////^
TOTAL
COM: 2500
WRITE IN
23-38
R
s
3
/
to
ft
E
/
/
/
%
c
f
S
t
/
4
ft
ft
O
O
o
If
ft
^
ปf
N
d
%
'
ปป
S
''
0
ft
ft
N
'ft
K
&
H
f
C
/f
E
ft,
/
/
O
jL
%
%
2
\f
A
ft
ft,
1
5
-r
'/.
I
tt
#
'
/?
B
'6
?<
1
0
1
%
r-
/
0
1
ft
Yt
f
b
4
&
H
%
ft,
r
'
,
ft
G E
FIXED
TYPE
UNIT
MG
LB
CY
CY
CY
LB
LB
SF
SF
TON
SF
^1
rM
DESIGNATION: TANKAGE
t
"A t
V
ป
QUANTITY
38-45
1!
?
/
%
ft
f
t
%
ft
O
Q
h
O
O
V
Q
2.
o
ft
ft
Q
3
o
%
DATE
48-74
m*
MATERIAL
54-80
ft
*
ty(
MM
Ml
^
C
. <
%
/
k '
7.
ฃ
i^m
r
0
ft
2
^
5-
1
p
0
ft
o
s
48
-
-
w<
%
SUBCONTRACT
54-80
ft
^B
^
4
^
*ซ
^
to
9
- <
c
t
#
i*
/
> -
> '
1 *
zi
^~
b
Mi
^
o
o
Ml
#
0
JOTL
i
<
10
I
k
k
LABOR
88-74
y'
^
^B
^5
e
4
-o
a
4>
^
L~>
.'
o
^
4.
^
o
0
^
C
o
o
^
rt
SHEET / OF /
zsoo
-------
CC1
t ail MAI t UtIAIL *Hfcfcl
ESTIMATE/JOB NO. -
SEQUENTIAL
PIECE*
CC11
-16
FIXED,
.. .. ..
BARE PIPE: CARBON
STL
ALLOY
OTHER MAILS.
VALVES: CARBON
ALLOY
STL.
OTHER NATLS.
FLGS. FIGS: CARBON STEEL
ALLOY
OTHER
ATLS.
SPECIALTIES-TRAPS
, ETC.
SPRING HANGERS
EXPANSION JOINTS
SHOP FAB'N. - VOR
. CARB.
STL
ALLOY
ERECT. UNDERGROUND PIPE
M H TON
ERECT. RACK PIPE:
CARB.
STL
M.H TON
ERECT. RACK PIPE:
ALLOY
M H. TON
CC2-6
4
/
m
0
CODE-*
7
1
t
3
AREA-*
9 1
0f
0
^
ITEM DESCRIPTION
17-22
1
3 0
1
n
#
23-45
LINE DESCRIPTION
17-22
1
1
1
1
1
3 (
3
3
3
3
) 2
3 3
0 t
A
B
C
D
t
F
G
A
B
C
D
E
F
G
A
B
C
D
E
F
6
H
1
J
A
B
0 5
0 6
A
B
A
B
C
D
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
83%%?%8%%882388^
TOTAL
CODE: 1300
WRITE IN
23-36
$
i
i
i
Wf
m
^
%
fy
%
b
ty<
%
ti
i
Imf^
%fey
i
#
?<
%
%
FIXED
TYPE
UNIT
TON
TON
TON
TON
TON
TON
TON
NO
NO
NO
NO
NO
NO
NO
UNR
UNR
UNR
UNR
UNR
UNR
UNR
UNR
UNR
NO
TON
TON
TON
TON
MM
TON
MH
W//A
w/a
DESIGNATION: PIPING
QUANTITY
31-45
^
r,
%
4
W
ty
%
71
%
H
%
/>
UAIh
46-74
i
\%
;
tu>
''M
MATERIAL
54-60
fa
#
fa
t
Z
tyt
\
7
^
5
fa
&
0
0
ft
o
0
C'
m.
s
46
^
m
^
i
*
%
SUBCONTRACT
54-60
i ;
^
\ !
^
fa
'ft
\
fa
ty
CC75-IO
i
P
i
\
\
LABOR
66-74
^
-------
ซfbซ
*wl
ESTIMATE/JOB NO. -ป
SEQUENTIAL
PIECE*
CC1MG
FIXED
-
ERECT. ALL OTHER: CARB. STL
MH/TOH
ERECT HL OTHER
: ALLOY
MH/TOH
FLO. SHOP FAB: CARB. STL
WH./TON
FLO SHOP FA3: ALLOY
TE
*H 'T0!l
mUG KELDESS
FiPlHG SKETCHES
TESP. FIP1HG
P!P; CASTES
EXCAY. FOR U3RD
COAT I *RAP m
. j>!PlHG
SRD. PIPING
SUB TOTAL - 1300
CGNC.P.S. ICQ',
INC. FOM.
FLO. FAB.
PIPE HAY TRENCHES
PRECAST P.S. -
PRECAST P.S. -
FAfi'K. OHLY
ERECT. MLY
PIPE SUFPT. RIGRIO HGRS.
HiKGR ?.$. - ?SirปS
SMALL SMป?ES -
P!
FLO. FAB.
PE PACKS - PREFAB
FIREPROOF. $*R.
Pi
Pi
Pi
?!HG iKSULAT!
!HTi*G SIR. S
INTIHG FIFE
STL. P.S.
C!4
TL. SliFPTS.
TESTING
4
CC2-I
/
^
H- ป
IU CO
A
B
C
D
*
*
*
*
Ei*
F
G
K
*
*
*
Ai*
A
AJ
*
*
A '*
A
A
V
*
9
A
9
*
A
A
A
*
2
A
l
a
A
.JL
A
*
*
*
*
*
*
*
*
*
*
~~1
j j //
TOTii.
DE: 1300
7
1
8
3
:ซ/
tl
L ^Hirfell
AREA-i
9 1
ป0i
0
r
DESCRIPTION
23-45
i
1
!
DESCRIPTION
l
i
WRITE IN
23-38
'
1
i ;
4
1
1
irt
j '
i [ :
.
^
If/
:
j i
!
t
i
i i j
l i _i_ i _ i i_
1
1
(
i
!
O
i~~
!S'i
i
i
g:
1
t
P
/
fl
'
Ct I/?
1
~~ ' ;
ฃ
/?
' ' ;
ft
/
S
*
1 j
!
!
1
i >
~^K\
! '
i
\
1 !
i
) j
.
1
r
&>-
DESIiSATIOH:
PI
!
j \
j
1
j
: : I !
j
i i
1 j !
^
^
"''"s
&
ft
%#
^
i
I
J (
FIXED
TYPE
usrr
TON
KH
TON
BH
TOH
HH
TON
kH
r
E
PL
A
iOL
LF
CY
LF
CY
CY
CY
KC
L3
^^LB
j
13
i
1 r
i
L
T
8
F
c
CN
TLH
/i
PL
^
WW<
PiSE
QUANTITY
39-45
;
|
>
)
A
T
\K
^
sf
&
ol
rJ
i
*
U
^T
^
^
ob
i
i
! i
!
4
%
$/$fa
^
46-74
^^^^^
MATERIAL
54-60
!
'
1 j
i j
I
I '
1
; i
i
2. do
I ! j
i
I
4TO
i
- *
1 Me
; i
! : i
i . [
1 ! i
i i/
M^
ซ-?-
S
46
DATE
m
^
SUBCONTRACT
54-60
I
i
1
i
i
i
1
! ' 1
^--
-
1
:
i i
f
i
i i
1
CC75-80
i
t
1
k
k
LABOR
68-74
t
i
!
L*
1 !
j [
1
1 (
i
1
1
!
1
j i
'
i :
i
! ,
' ' ' i
1
t
j
I 1
i . :
L\c\
6|cj
V '-V/i
. ! $4 G.C
i
ป
i
|
i
1
1
i i
i *
i
l
i
t
L
i
i
!
i;^So
l
L\4 o
i .
r_ i i !
J7100
i 1
' ;
: !
1 ; * ' ; ' \o 'A'f*)]
: i j '1 ^ " V/l
1 i ;
't"-t. 1
%<%-'$'$&
i !
ป" t
^
1
~jff~:*y?
SMccT
/'7
;ฃ2;^
~:*r-"i": ;-*?. -*)
''" ''- - ** ' ' / '*
OF ]
~V"~
-------
(x
>
CGI
ESTIMATE tit TAIL SHEET
ESTIMATE/JOB NO. -*J
SEQUENTIAL
PIECE*
CC11-18
FIXED
ป . *.
INSTRUMENT BOARDS
BO-ttTD. INSTR. -
ANALYSIS INSTR
ACCESS
FLO
FLOW INSTR. FLO.
LEVEL INSTR. FLO.
PRESSURE INSTR
. MTD.
KTO.
MTO.
FLO
TEHP. INSTR. FLO.
WEIGH INSTR. FLO,
. ปTD.
KTD.
MTO.
COMBUSTION CCXTROL
CONTROL VALVES
SLIDE CHOPPER
PLUS
VALVE POSITIONERS
- PKGD.
VA
BUTTERFLY VALVES
RELIEF VALVES
.A. FILTERS, REGS.
ACCESS.
.A. TUBING & FITTINGS
I.A. SUPPLY
A. CHANNEL &
INSTR. PROCESS
SUPPTS.
PIPING
INSTR. HOUSINGS
INSTALL. CALIBRATE,
ST-UP
INSTRUMENTATION SUBCT
.
SUB TOTAL - 1500
FTGS. S PIERS
CURBS 1 LEV. RAIL PANEL
PIPING IHSUL.
PAINTING - ECU
PAINTING - FIF
til
iL
E
UJ
RIZE
m
W//////M',.
1(
CC2-6
4
/
4
f
C
CODE-e.
7
1
I
5
\
AREAn
9 1
* O j
0
r
ITEH DESCRIPTION
17-22
1
i 0
i
#
#
ฃ
^
> A
23-45
/
N
s
7
f
?!/r
1<
E
LINE DESCRIPTION
17-22
1 \
\ \
1
1 '
1 !
1
1
1
2
f
I
1
) 0
) 1
j 1
3 1
j 2
5 5
1 1
1
2 0
3 0
30
;
tl
3
1
6
8
0
0
0
1
ti
A
B
A
B
C
D
E
F
G
A
B
C
P
E
A
B
C
0
A
B
A
A
9
A
ft
A
A
B
*
*
*
$
*
*
*
*
*
WRITE IN
23-38
|
1 i
CODE: 1 = 00
V
T A "
FIXED
TYPE
UNIT
LF
NO
NO
NO
NO
NO
NO
NO
NO
NO /
NO
NO
NO
NO .
UHR
UNR i
UNR
UNR I
UNR (
UNR \
%BC
UNR
CY
CY
I LF
^TON
TON
'i
DESIGNATION: INSTRUMENTATION
4Zu/&
y/M
rj
0
N
QUANTITY
39-45
fM
f-
,
NS
N e.
V B
&%&
f
(S
(a
&
%%%&.
c"
-ฃ_
r
^L
^
.
4
.
ft
*?/
ty
ft
DATE
46-74
%
g
'%
'//
A
^
V*
's<
V'
ft
MATERIAL
54-60
,
^
1
/
^a
^
M
^
^
2.
/.
b
/
/
w <
- i
fa
ฃ
z.
A
t
f
f
/
0
0
o
0
C
O
^
>
^
ty
o
o
o
0
o
M
ft
O
V
^
O
*
^
S
46
W/A
*
^
^
^
^
SUBCONTRACT
54-60
N
i
i
w:
1
e
aai
i
*C
j "*
, i
i j
i
ซ
%
Km
a^
4-
i
r
i i
^งe^?^
j
i
^
1
CC75-8C
i
t
t
k
LABOR
88-74
^*
.*
?$,
\
y
t
!ซ
/J/
/
3
Q
V 1
^~
fy
?
9
P
<3>
1* '
Q<
^
0
0
C
*
0
O
i
4
i
ft
o
^
o
SHEET / OF /
-------
CC1
S
t
ESTIMATE/JOB NO.
EQUEHTIAL CC1M8
ปIECE#
FIXED
ป. ,, ,.
MOTOR CGNTPQIS
POWER si! RiKG
LIGHTING SfSUH
GRDUHD1KG SYSTEN.
(TELEPHONE & CCIKUN. SYS
ELECTRIC TRACING
SUBSTATION
iKiTSUKEKT w|fj ';s
GEHL. ELECTRICAL HATL.
ELEC. SUBCONTRACTS
,
TEMP. P i L KATLS. CCCO.
POKF.8 8 ILLS
TEMP. P i L SU8CONT.
SOB TOTAL - 1603
>I!SC. ELECT. SUFPT. FTGS.
DUCT ENCASEMENTS
ELECT. MANHOLES
STRUCT. STL. FOR SUPPTS.
PMH7ING - STRUCT. STL.
P&J1LLMS - EQUIP.
PA'NTIHG - CONDUIT
CC2-6
-*^i/
ฐi
4
O
17-22
1 J3|0_
1
# #
11
fV
lAufc Dfel/!
CODE -e.
7
1
8
6
\\
il bHfcfcB
AREA-*
9
ป0
0
<
ITEM DESCRIPTION
23-45
I
i
LINE DESCRIPTION
17-22
1 6 0^
i !
[
1 6 0
2
5
j !
i
i GIG
1 6 G
7
8
1 8)0 8
I t
116 iiO
i
1 7 1
1 7 2
1 712
1(8 0
i i j 0
0
0
9
I
V
2201
2 3 0
1
i !
i !
m
1 i
TOTAL
A *
A
8
C
0
*
*
*
*
t *
A *
8 *
C
*
A *
A
*
A "
8 *
A
S
C
9
A
A
A
A
A
*
*
*
g
*
*
*
*
*
R *
C
*
W
%!i
WRITE IN
23-38
1
t
t
i
i
i
t i
! ;
i
: {
i
1 t
i I
1 j
i
i
j
j i
i
f
1 i
i i
I
j
]
i
i !
i i
t
I
]
l
i
i
i
IIP
?$
W%
\ CODE: ;P.CO CESSATION: ELECTRIC
1
f@%ZM&*
mzfwb/.
T
FIXED
TYPE
UNIT
HP
UNR
UNR
UNR
UNR
i:
0
NR
KVA
KVA
KVA
UNR
UNR
UNR
USR
'JNR
UNR
UNR
CY
CY
CY
L8
TON
TON
TON
> \
j
.. . i
i
m
QUANTITY
39-45
i
~~* 1 !
i i '
m
AL
1
j
I
1
1
i
DATE
45-74
''fffifA
\
MATERIAL
54-60
ซ
m
1
1
r
j
%
^M
V
2
^
ฃ
3
do
0b
on
T"
t-
ป*4
2
0
ป
0
i
/
/
o
c
! :
0
0
i
i
i
i ! ! :
^%^^^^?^'
& '. . SOW
%
ft
S
46
^
Wfa
TTspy^ffF*}
%
SUBCONTRACT
54
-60
i
!
CC7S-SO
i i !
A
j.
4 I
LABOR
88-74
! / ฃJ0 O
i ii %\AQ
! j / ' 2J^ Q
'tyO 0
-H- jcj | -
i ! _. |0 I i
i > :
i i
: 1 \&)Qft
i i
t i !
! i' -.'
l
|
i
i '
i |
I
i
!
{
i
!
1
1 . ;
} ; J ; l
' i
i '
i
!
i
i
i
\ \ I
i !
: . t
i
i j
' ' '
' ' ! . ! i !
i ' (40pj
: : ! I 1
' t
i 1 i
i ' *
! ' [^OiO
! ' !
; I
' ) '
: - ! '
i
fit
<$'
'^'
SHE
, . : '
-y, . ; S'+fc^ffifa.
/ &'6aO
ET 3F
GROUP3f
-------
CC1
ESTIMATE/JOB NO. -H
SEQUENTIAL
PIECE* *
CC11-10
FIHB
*- .. ,.
ROUGH GRADING
FINISH GRADING
BLACK TOP RDS. & PAVING
GRAVEL. SURFACING
RAILROADS
FENCING
EARTH DIKES
DIGGING TEST HOLES
DEEP DELLS
TEHP. RR. ROADS
. FENCES
SITE DORK (OEUOLITIOtl)
SITE DORK SUBCONTRACT
SUB TOTAL - 21
CONCRETE VALVE BOXES
FIREDALL H FOOT 106
FIREDALL D/0 FOOTING
LARGE RATER SEPARATORS
OUTSIDE PAVING
RETAINING DALLS
SIOEDALKS
W
!fc5ซ
CC2-0
>4-
1
94-
0
8MATIE DETAI
CODE-*
7
2
c
L SHEET
AREA-*
s
,<;
10
?5"
ITEB DESCRIPTION
17-22
2
0
1
*
*
F
23-45
O
$
r
^
Tfi
A
LINE BESCBIPTION
17-22
2
2
2
2
2
2
2
2
2
2
2
1
i
7
7
7
7
7
7
7
7
0
0
0
0
0
0
0
0
1
1
5
1
2
2
2
2
2
2
3
2
3
4
5
6
7
8
9
0
1
0
7
1
2
3
4
4
5
0
B
C
D
A
A
9
A
A
A
A
A
B
A
A
*
*
*
*
*
*
9
*
*
*
*
*
*
*
*
TOTAL
CCBE: 2100
WRITE IN
23-30
e
f
%
I
ft
/
1
ฃ
-
0
^
I?
0
H
L
%
7
ฃ
ฃ
ff
9
/v
F
^
'
ft
%
r
&
'i'
fa
D
ff
%
%
\
a
.
A
ฃ
53
^
K
p
^
r?
^
ฃ
^
ฃ
B
8
A/
tf
d
-
*
$
u
8
^
fa
|
1
ti
<
f?
/
fa
#
$
D 1
H
FIXED
TYPE
UNIT
SY
SY
SY
SY
LF
LF
CY
UNR
UNR
UNR
UNR
UNR
UNR
UNR
UNR
CY
CY
CY
CY
CY
CY
CY
CY
%$
OESI6NATION: SITE DEVELOPMENT
:
QUANTITY
30-45
ฃ
K
4
3^
h
0
^
^
iP
^
-
^
^
fi
^
y
^
w
DATE
46-74
^
%
%
<
' ^
ป
MATERIAL
54-60
%
mam
.
^
-<
.,
T!
ซl
^
^
y> >
s
46
'/M
^
^
^
%
SUBCONTRACT
54-60
,
H
%
$
ป
^
^
^
<
#
3
(9
fi>
%
0
0
c
0
0
0
CC75-BO
1
i
i
i
LABOR
68-74
"
ซ
^B
e
. f
j
j
fc-Lj-j
%pl%
ft
Jo
M
Yi
-
^
SHEET OF
-------
'
c--
CC1
ESTIMATE/JOB NO. -o
SEQUttJTIAL
PIECE*
CC11-10
FIXED
- ป- - .
FIRE PROT. SYSTEBS
'
EXCAY FOR FIRE
LltlES
.
DEdOLITIW-FinE
LINES
-
m
W///////////S
w//.
%
Y//,
U.
CC2-0
*
1
^
4-
0
CODE-e
7
3
0
3
ML 5HEI1I
AREA-i
0 1
>0i
0
ฃ
ITEtJ DESCQIPTION
17-22
3
3
0
1
#
#
23-45
F
A
sฃ
JPlfc
o
T
'S
c
/ '
0
LINE DESCMPTIOtl
17-22
3
3
3
3
0
0
'///////M
2
3
A
A
B
B
C
C
D
D
E
E
A
A
B
B
A
A
*
A
*
A
*
*
A
*
A
*
A
*
A
*
A
WRITE IN
23-30
P
D
fj
v
5
f.
^
e
*s--e
i i
H
r
ป
A
h
/
X
f)
C
t
tf
f
1
$
AJ l*
p<
?#
1 '
f
<
N
FIXED
TYPE
UNIT
IF
UHR
UNR
UHR
UHR
CY
CY
UHR
mw#MmWMr,&mw,///M
QUANTITY
39-45
4-
0
#
s
46
mm&mmmmm?/?,
%
ซ
^
^
%
SUBCONTRACT
54-60
ซ
w%
TOTAL &%ฃ2$2%2ฃ22&2323ฃ2%%@32%ฃ%ฃ3f%2%%%2ฃ232%2&2(23 1 ! t444k)k3T i
CODE: 3300
DESIGNATION: FIRE PROTECT! OH
HI
MHI
*
o
M
^
M
^M
i
iSnT
CC75 80
i
IL
i
t
LABOR
60-74
%
i
?,
f
r
o
f)
0
ft
'
^%^%%%B
^r:ni
SHEET OF j
33OO GROUP
-------
VI
UMT
SUB-SUMMARY
TV~-
i USTQS8ER
.- LOCATION
t
^
_ CODE
! 0100
0200
< 0400
' 0500
0600
1 0700
: Qงoo
0900
r- IDOO
: u&
IHI8
- 2500
2900
2soo-
_ 3000 S
^Jv/lKOJdrtlFMTAi- fRofecfiorJ Ac?Ek)cV ESTIMATE NO. WlofazKW.ih
O^Rv^Am t kJoflrM (U/^nLiioA
p - -
DESCRIPTION
FIRED HEATERS AND BOILERS
STACKS
REACTORS AND INTERNALS
T09ERS AND INTERNALS
HEAT EXCHANGE EQUIPMENT
COOLING TOWERS
VESSELS. TANKS. DRUMS & INTERNALS (/)
PUMPS AND DRIVERS
BLOWERS AND COMPRESSORS
ELEVATORS. CONVEYORS. MATERIALS HANOLIN6 EQUIP.
BISCELLANEOUS MECHANICAL EQUIPMENT
TANKAGE
FILTERS. CENTRIFUGES. SEP. EQUIPMENT
AGITATORS AND MIXERS
SCRUBBERS & ENTRAINMENT SEPARATORS
3100 1 BACHINE TOOLS & MACHINE SHOP EQUIPMENT
2700 1 HEITIRS. VENTILATION. AIR CONDITIONING.
B OUST CONTROL (Process only)
* ,400 | PACKAGE UNITS
1
SUB-TOTAL - MAJOR EQUIPMENT
1300
1400
1500
1600
1700
1800
1900
ปsa
2IB9
- 2700
2300
2400
- 2800
2700
3300
3500
3700
~-aฎ^p
00
1300
-r?PO 1600
2000
2100
PIPING
SEW RS
INSTRUMENTATION
ELECTRICAL
CONCRETE 20 a Y
STRUCTURAL STEEL
Mซf PROOFING
lUILDINGS
SITE DEVELOPMENT
INSULATION
PAINTING & PROTECTIVE COATINGS
FIELD TESTING
CHEMICALS AND CATALYST
PILING
FIRE PROTECTION
MISCELLANEOUS FURNITURE FOR PLANT BUILDINGS
SUB-TOTAL
MISCELLANEOUS DIRECT CHARGES
STOREHOUSE ACCOUNTS
CONSTRUCTION SUPPLIES & PETTY TOOLS
TESTING WELDERS
TEMPORARY PIPING K ELEC R CAL FACILITIES
TEMPORARY CONSTRUCTION 1 .DINGS
TEMPORARY SITE DEVELOP* NT
TOTAL DIRECT COSTS
MATERIAL
/O^OOO
/oyooo
L4oo
2JOO
2.400
6 tO
/ro
2,2510
S3O
30
/9,770
.;'
I
ffปTF
MfiF OF
LABOR
7J&
7^0
SJOO
/.COO
z[/oo
2.2.S-0
Z40
4^oo
'^2.0
270
/G,73O
SUBCONTRACT
ซ ,
.
-------
GC1
ca HIM A IE ui&UAuiL aiMibibi
ESTIMATE /JOB NO. -ซ
SE6UEBTIAL
PIECE* *
GC11
V
/
/
10
o
FIXED
ป. ป
HEIGHT
DESIGN OF PSIG
SHELL: DIAHETEH
LENGTH T TO
r
THICKNESS
HEADS: NO.. TTPE
PL
THICKNESS
. SPEC.
HOUNTING
SUPPORTS
HEIGHT
DBG. NO.
INQ. NO.
VENDOR
FREIGHT
INTERNALS
INTERNALS
INTERNALS
INTERNALS
SUB TOTAL - 0801
SLABS-PEDESTALS
SADDLES
SUPPT. SUPERSTRUCTURES
PL
ATFGRMS/UDOERS
FIREPROOFIN6: TYPE.
_1MSULATION: 1TPE 1
PA
PA
COVER
INTING: STRUCT.
INTINB: VESSEL
nil
JB
i
_SJL.
CC2-6
> ^l/I^!^
O
CODE-*
7
0
1
8
\
AREAn
9 1
>Ot
0
(,
ITEB DESCRIPTION
17-22
0
8
0
1
n
9
23-45
L
/
3t
)
i
p
A
Me
IN
a
LINE DESCRIPTION
17-22
1
1
1
1
1
2
2
2
2
7
7
8
8
9
2
2
3
3
0
1
0
0
0
0
0
0
0
5
5
1
3
1
1
1
1
1
A
A
A
A
A
A
A
A
A
A
B
C
C
C
D
E
F
G
H
9
B
*
A
t
D
t
F
G
H
1
J
*
A
B
C
*
*
*
*
*
9
/%ฃ/*/ firirtfrSA
TOTAL
CODE: 0800
WRITE IN
23-30
/
/
ฃ
r
//
3
7
H
s
u
/
y
fe
tffy
j
f
/
?
a
A
$>
0
e
N
0
o
O
?
ฃ
((
D
g
iy
S
O
ft
0
F
'
L
1
D
A
o
^
zl
L
?
Q
2>
ฃ
%
m
ฅ
T
/
9
/
U
^
S
?
f>
S
A
N
4-
'^
%
ft
f
7
1>
II
%
L.
0
^
&
t<
h
f
fa
P
a
fa
V
S
^
S
T$
<4
A-
/
V
r
^
^
X
^
STc
FIXED
TYPE
UtJIT
LB
LB
CHT
CF
CF
LB
LB
CY
CY
LB
LB
SF
SF
TON
SF
"ffifi&fc
%<
DESIGNATION: VESSELS, TANKS & DRUBS
'&, ^
T
A
ft
JK
QUANTITY
30-45
ฃ
w/
0
1
ft
^>
O
^
0
/
ฃ
^
^
0
7
o
DATE
48-74
i
%
^^
MATERIAL
54-60
#!
ty
^
/^
/
y
/
M> ,
^
/
7
3
f
I
ป
/fe
?
PK
oc
^C
ft
M
3C
y
^
S
48
ป
ป
J(X
1 ^
'''M
>
^
i
^
^^
?
SUBCONTRACT
54-80
^
MJ
MM
/ft
Ml
*ป
SZ
MM
> 1
O
^
ซ
i
MB*
ป
MMP Bh
i^
4-
CC75-QI
i
ts
L
i
k
LABOR
88-74
^
i
m
(
t
3?
f]
/r
/
a
f
^
0
5"
^
-------
CC1
ESTIMATE/JOB NO. -*
SEQUENTIAL
PIECE*
CC11
-16
FIXED
.- ป.. .
BARE PIPE: CARBON
STL
ALLOY
OTHER MAILS.
VALVES: CARBON
STL.
ALLOY
OTHER BAILS.
FLGS, FTGS: CARBON STEEL
ALLOY
OTHER
HAILS.
SPECIALTIES-TRAPS,
ETC.
SPRING HANGERS
EXPANSION JOINTS
SHOP FAB'N. - VDR.
CARB.
STL
ALLOY
ERECT. UNDERGROUND PIPE
H 'H TON
ERECT. RACK PIPE:
CARB
. STL
M.H TON
ERECT. RACK PIPE:
ALLOY
u u T nu
H H, lUH
ปBiimAU[g yiฃn^
CC2-6
4-
1
<7
4
C
CODE-e
7
i
t
3
1
\\
\L ^HglbO
AREAn
li!
4?<
0
I
ITEH DESCRIPTION
17-22
.1 :
0
1
#
#
23-45
LIRE DESCRIPTION
17-22
1
1
1
1
1
3 0
3 0
3 0
3 0
3 0
2
3
4
5
6
A
B
C
D
E
F
G
A
6
C
D
E
F
G
A
B
C
D
E
F
G
H
1
J
A
8
A
B
A
B
C
0
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
'^^^mm^m^^^^
TOTAL
CODE: 1300
WRITE IN
23-3C
i
i
i
!
i
<
t i 1 i i t 1
&
^
' : i i
j i
mm
n
m
ft
%<
m
%
^
^
^
%
#
%
h
Mt
YS
Yjf
fy
FIXED
TYPE
UNIT
TON
TON
TON
TON
TON
TON
TON
NO
NO
NO
NO
NO
NO
NO
UNR
UNR
UNR
UNR
UNR
UNR
UNR
UNR
UNR
NO
TON
TON
TON
TON
HH
TON
HH
w&
w//<
DESIGNATION: PIPING
QUANTITY
39-45
^
/
%
%
ป
&
s-
%
h
,.
T
H
\
W<
w/,
%
w
DATE
48-74
%
^
*
II
MATERIAL
54-80
71
if
/
0
0
0
' ' i
%
#
1
i^
%
0
0
o
m
s
46
w
%
%
%
&
f
SUBCONTRACT
54-60
}j
VJ
MA
ty<
\
ty.
/A
YA
CC75-0(
i
i
\
i
LABOR
60-74
^
1
#
; !
,
^
YJffo
tt i SHEET OF X
-------
1
1
\
ESTIMATE/JOB NO. -*>
SEC'JEMWL
PIECES -
CCU-18
i !
F5X.SO
.. _ ,.
ERECT. ALL OTHER: CARB. STL
HK'TOH
ERECT ALL OTHER
F:
ป:,-\ T
3. SHOP FAB:
: ALLOY
CN
CARB. STL
OH-'TOH
FLD SKC; FAS: HLOY
Tฃ
PI
KH.-'TPM
STING WELDERS
pปHฃ SKETCHES
!E*F. Pi?!SG
PIPE CASTINGS
;ป
"'V. FC.'' C"jrr
COAT & *RปP UNO
JIP'^u
GRD. PIPING
Si!
B TOTAL - 1200
1* V
IN
?:
F?
r
r*
Pi
V
*C P.S. ICO",
C FCH. .
FID: FAS.
FE W TRENCHES
CAST P.S. -
Ei^ST P.S. -
FAB'H. OKLY
EPECT. ONLY
FE SOFFT. RIG?! ID HERS.
^5 PS. - CC
S**ll SHAPE; -
FLD. FA8.
PiFE ?':<$ - PREFAB
r
r i
REPROOF. STR
?i^ IkSULAT
STL. P.S
r:H
FtiHTiHG STS. STL. SWPTS.
Pi
INTIKG PIPE
TESTIKG
* '7~T
^..^.-prrr.
-(
,,. Tfr^'Z'&ffify;
i
1 i i
ESTIMATE DE'i*
CC2-6
4! 1 ^ id-
0
CODE-*
7
1
a
3
II i
ill SHEET
AREA-c
9
*d
0
I
ITEM DESCRIPTIOH
17-22
' 5 ฐ
1
1
n
it
23-45
i
LINE DESCRIPTION
17-22
1
1!
'
~
'
3 G 8
3 0
c
A
8
C
D
E
F
8
K
4e
*
*
*
*
*
*
*
Ai*
A
its ijoir
i;
i
3 3
3 i
IJM
i
i
l
i
i :
~TT~
S
0
1
1 i
3
i
i
7 1:8
I 3
7i?
8 0
g-i Q
1
JL
v
5
jTl Qi5
1
1
2,
/j
2:
8 !)!7
SlOil
2 Q|l
2JO
Tl
^m
.> v ป i
ป . I-. V
.1
1
W
A
*
*
i *
A
*
9
A
9
*
j
A
A
*
*
A!"
A
B
C
A
A
*
*
*
*
A *
A '
E *
A!*
u?
WEITE IH
23-38
1
4
t..
t
6
0-*?
i
i
i
i
i !-
i
i
i
[2
i
!
-
H
!
.
)
1 |
t
o|e>
!
#
o
i
1
Nl
i -
i
i
i
i
_ ... ! ''-. \
i
1 ! i ;
ft
i
7$Z'
<%t
I , ^
! i
i . . j j
t
!
FIXED
TYPE
UK!T
TON
MH
TON
fan
TON
MH
TGN
ปH l
fjpi
Eft
t
DL
LF
CY
LF
CY
CY
CY
HO
LB
L
s
LB
LB
CF
IF
TCH
TON
6.
PL
QUANTITY
S2-45
1 0
v
1
r
)
*>
rw
t i
t
-L J L _L
i
i
:
'
"3io!o
1
&
1 '
/ .
li
f
1 II 1
i
DATE |
45-74
MATERIAL
54-60
!
]
i
i
t
i
!
,
1
;
l
._. i . .-i . j .
.
i
P i
l
j
1
/
/ !?'
; i
j
0\
(510
; , |
i i
' -1 '
40w
, a
30
i
^4
(P
3
C
^
Mtfi>>
S
46
'
-
f
^P
W,
SUSCCNTR/S.CT
. 54-60
i
i
i
1
H
!
1
1
C1J75
J
WM
ซHlMi
- IA3
.33" ""
f
L
!R
ซM
L.
65-74
-
; i
i
i
. ,
,
i
L-. ,
J
1
*
i
!
i
i
:
-* '
i
1
i
!
4-
1
t
1
! ; U *4
i - ' , : .
i
*~ i
w
^
4!O|
r
i
'>'
ซ*
!
.A
\ COiL 1300 DtllCXATiOlt: PIPING
-ซ4>
^'
S,HL
(
h
-t
i
--I-
i
!
:
' i
i
,
1
:
i
,
1
i
t
i
i
H~r
H-f
i
i
i
i
^
1
f~~~
.
4-
i
i
i
-
__
! j
O ;.
i
O
t
(J
o
oi
, / ; ' :
;
^fe
-*-(^l .
1 "*"
-^-:ฃ20
i^.iJ'^Srt^Uj's _
0^
ป.
i
i
1
1
-1
^f
^r
-------
CC1
ESTIMATE/JOB NO. -*
SEQUENTIAL
PIECE*
ecu-is
FIXED
. ~ ป. ..
INSTRUMENT BOARDS
BD-HTD. IH3TR. -
ANALYSIS IKiTR
ACCESS
FLO
FLCซ INSTR. FLO.
LEVEL iNSTR. FLO.
PRESSURE iNSTR
. ซTO.
HTO.
BTD.
FID
TEMP. INSTR: FLO.
HEIGH INSTR: FLD.
. HTO.
BID.
MTO.
CGK8USTICK CCM.TRCL
CONTROL VALVES
SLIDE CHOPPER PLUS
VALVE POSITIONERS
- PKGD. 1
VA
BUTTERFLY VALVES
RELIEF VALVES
t.A. FILTERS, REGS.
1
ACCESS.
A. TUBING & FITTINGS
I.A. SUPPLY
1
A. CHANNEL i
INSTR. PROCESS
SUPPTS.
PIPING
INSTR. HOUSINGS
INSTALL. CALIBRATE.
ST-UP
INSTRUMENTATION SUBCT
SUB TOTAL - 1500 <
--
.-,
FTSS. & PIERS ' -
CURBS & LEV. RAIL
PIPING, INSUL: unr
PAIHTiNS - EQU
PAINTING - PIP
'F
PANEL
HI
iiZE
' ..
! TOTAL
fcSIIMATE Ufei^
CC2-8
4
<7
4-
0
CODE -ป
7
1
i
5
1
AF
u
(E
1L 5HefcI
A-s
9 1
O
0
ฃ
ITEM DESCRIPTION
17-22
1
j 0
1 #
#
23-45
^f
'A
1
/
N
$
7
-*
5u U
ฃ
LINE DESCRIPTION
17-22
1 !
1 J
1 !
1 !
V I
1 !
.', ..
1 '
1 '
2
i 0
i 1
3
1
I
> 1
i 1
2
i 5
} \
H
J 0
6
8
0
0
0
0
1
2301
2301
' j
fy/s/y/''/'
A
B
A
B
C
D
E
F
G
ft
B
U
0
E
A
B
C
0
A
B
A
A
9
A
B
A
A
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
9
B'
-_-_-,
WRITE IN
23-38
'
-
ซ
i
'
;
i
' ] i ' ! i '
1
^
-
,
,
i
| . . i i ' ; " ! ' i
i ; i.
%
.
N
7
/
FIXED
TYPE
UNIT
LF
NO
NO
NO
NO
NO
NO
NO
NO
NO
NO
NO
NO
NO
UNR
UNR
UNR
UNR
UNR
UNR
*MC
UHR
CY
CY
IF
TON
TON
ft.
^
%
\
/f
IT
1
9
fV
QUANTITY
38-45
*
t
A
^
' ฃ"
r~
t'
i.
"
' . '. ,
CC75-80
J
j
i
1
LABOR
88-74
1
-
;. ^^i. ;m- T- U-
1
<5
^9
0
0
>
~~.-l
i
_^.|
- [ ' ' : :
1
W%4fo
^i
. ; ; j , : :
'tfffi#)00r%fy's:t'fflffi/
\ \ Tt-r-Ti 1 : i/k?iOO
DESISNATIC^:
NSTRUSEN'ATION
SHEET / OF /
-------
CC1
ESTIMATE DETAIL SHEET
ESTIMATE/JOB NO. -> i
SCQUtHTiit
PIECE* -
CC1MI
1
i
FIXED
_ _ ..
MOT03 CO-iTPOLS
P34ER 3!f\i>iG
LtGnTiKG SfSTEH
GR^'uiss SYSTEM
TELEPK3HE & Cf^JN.
SYS
ELECTRIC TRACING
SUBSTATION
ISCT'iiSEhT V-'.FiSS
CC2-6
1|
?!f
()
CODE-ป
7
1
a
6
J1"]
ฃ]
ITEM DESCRIPTION
17-22
1 6JOJ1
*
#
23-45
i
l
LIKE DESCRIPTION
17-22
1 0
\ 6
1
l!8
GtNL. ELECTRICAL HATL.
ELEC. SUBCONTRACTS
TEW?. P 4 L MAILS.
P
io SILLS
ccco.
TEKP. p & L SISB:DHT.
SUB TOTAL - I6QO
SiSC. ELECT. SUPPT.
FIGS.
DUCT ENCASEMENTS
ELECT. MANHOLES
t
f
TRUCT. STL. FOR SUPPTS.
AiKTiKG - STRUCT.
PARTING - ?OU
IP,
STL.
PAINTIKG - COHDbiT
l;6
1 6
C
2
i
0 5
C3
C
9
i I
I!E
i
T
1'iO
Ij7|l
i;7
1 7
2
2
i B|Q
2 3
2i3
2i3
i
1
j
l
>* t
jr :,
^W"^;-?.
'.'
o .?.-..
"'
^9?
^
i
;
0
0
0
0
0
g
i
i
i
i
i
.. ~ ,
A
A
B
*
*
*
C *
0 *
t
A
B
*
*
*
C *
A *
A
A
if
*
B:*
A *
5 if
f i*
U i
3 S
i
A *
A *
A
A
*
+
A *
3 *
C
*
.
j
"%$ฃ,
WRITE IN
23-38
1 j
j 1
i
i ~ i
i
i
i
; 1 'i
i i i i i
i i '
i ;
- t
i " i
i i
I
i ^
I '
i
! ! ' \
\
i
i j ,
l
i
;
t
1
1 ' ! '
; ' ' ' ' 4
' : ' '-
\ \ \
\ \
-- r - .j,. ..
-\
'?^mi^^^^^
1
I
/, '//
FIXED
TYPE
UNIT
HP
'JNR
UKR
(JNR
'JSR
UNR
KV*
KYA
KฅA
UNR
L'NR
UHS
UNR
INK
UHR
UHR
CY
CY
CY
LB
KTGN
i
._.
f*f>
j.1*
T
ON
TON
>7
T^ r;-
r
1
^
QUANTITY
39-45
\
i
\
' j
i
- i
l !
\ i
i !
^ 1
i
""
- *
'
-
-
'
L
'
|
-
-
;
-
1
i
..:- ..
Wt
%
'&
DATE
46-74
WM
MATERIAL
54-60
i^
^m
j
~i
ซ
<
\ m
Itf
P
* i
>-
Mซ
*
rt
D
_.
w
^44
"4
1
.
H
! ! ^
2
o
.
0
i ]
i
i
~~\ *~
\ i/OO
?
;
i ' '
S
46
ซ
SUBCONTRACT
54-60
i
i
i
1
i
-fyrp-
J t
A
LAECR
68-74
-H-M-+
_j ; *-4-l-U
!
j j
I i
/
I I /GC
\ \
I
.
j
! . ; t ;
! ! i ' '
-.-?
:
t
i j!iซ0
i TC00
L_ ' , L
III" "l
i"1"J ""4*
! j I
j ! ! i
* i '5 *'0Q
\ :
t ' > '
j
i
;
'
I ] ' ;
- l ' '
1 i l
; i
\
; i I
l i 1 !
l ;
l
1
| I
i
i
j
i ' :
i
i I '4'coi
MM :
: ; ! j
! , )
LJ ; ^.'' ' J
i 1 ' \4'OO\
\ ' i ' 1
i : ' i ' 1
; : ! ' 1
; J '
-
- '
t
'%&ffi&fr'%ฃ:fr/!'','}''-': - ',- ' " ' ' '' '
H 1
* ^
Dฃ: :;:[ DES!3MAT!CN: ELEC*R!CAL
i
1YOC
,XEฃT JF
Kboo
-------
.021-271
SUB-SUMMARY
f-
jj USTOMER
r- LOCATION
u
r- CODE
, 0130
rOZOO
0400
0500
! 0600
I 0700
? 9800
: 0900
r ioฐฐ
3 1100
! 1200
It- 2500
8 2600
1 2900
I . 3000
^V/RonJis/veifJTAL PRortcnod AGCtJt^ ESTIMATE NO. 4/t40(lfl'K fal/}
DuftiAAiVl . K)oRTl4 CAK0UMA
DESCRIPTION
FIREO HEATERS AND BOILERS
STACKS
REACTORS AND INTERNALS
TOWERS AND INTERNALS
HEAT EXCHANGE EQUIPMENT
COOLING TOWERS
VESSELS. TANKS. DRUMS & INTERNALS (Z ]
PUMPS AND DRIVERS (?)
BLOWERS AND COMPRESSORS
ELEVATORS. CONVEYORS. MATERIALS HANDLING EQUIP.
MISCELLANEOUS MECHANICAL EQUIPMENT
TANKAGE
FILTERS. CENTRIFUGES. SEP. EQUIPMENT
AGITATORS AND MIXERS
SCWBiOS & ENTRAINMENT SEPARATORS
=3100 ; MACHINE TOOLS 1 MACHINE SHOP EQUIPMENT
i 370D 1 HEATING. VENTILATION. AIR CONDITIONING.
; ง DUST CONTROL (Process only)
1 ,400 I PACKAGE UNITS
i
SUB-TOTAL - MAJOR EQUIPMENT
1300
1400
_ !500
1600
1700
__ IBOO
1900
200C
2100
~ 2200
2290
2400
1- 26HO
2700
3300
_ 3500
3700
-3000
00
(300
T300 1600
2oOO
2)00
PIPING
SEWERS
INSTRUMENTATION
ELECTRICAL
CONCRETE /93 CX
STRUCTURAL STEEL 34 TON
FIRE PROOF ING
BUILDINGS
SITE DEVELOPMENT
INSULATION
PAINTING & PROTECTIVE COATINGS
FIELD TESTING
CHEMICALS AND CATALYST
PILING
FIRE PROTECTION
MISCELLANEOUS FURNITURE FOR PLANT BUILDINGS
SUB-TOTAL
MISCELLANEOUS DIRECT CHARGES
STOREHOUSE ACCOUNTS
CONSTRUCTION SUPPLIES & PETTY TOOLS
TESTING WELDERS
TEMPORARY PIPING & ELECTRICAL FACILITIES
TEMPORARY CONSTRUCT 01 BUILDINGS
TEMPORARY SITE DEVELOPMENT
~ TOTAL DIRECT COSTS
MATERIAL
ฃ>^Iฃ~O
3\\*AO
*
37J
-------
CC1
ESTIMATE/JOB NO. -*
SEQUENTIAL
PIECE*
CC11
V
/
0
10
k
FIปB
ป ป. *.
HEIGHT
~UE
~S~H
SIGN OF PSIG
LL: OIAKETER
LENGTH T TO T
THICKNESS
HEADS: NO.. TYPE
THICKNESS
PL
. SPEC.
MOUNTING
SUPPORTS
WEIGHT
0*6. NO.
INQ. NO.
VENDOR
FREIGHT
INTERNALS
INTERNALS
INTERNALS
INTERNALS
SUB TOTAL - C301
SLABS-PEDESTALS
SADDLES
SUPFT. SUPERSTRUCTURES
PLATFGRXS/LAPOERS
FIREPROOFING: TYPE.
THR
INSULATION: TYPE THU
PA
COVER
INT ING: STRUCT.
_PJIMTIHG: VESSEL
STL.
e^HimAUiE Uc.iJt
CC2-8
4
)
9l4-!<0
CODE-*
1
0
i
8
\
til SHEET
AREA-c.
8 1
O
0
7
ITEH DESCRIPTION
17-22
0 E
0
1
#
#
23-45
P
K
o (
i i
ฃ
ฃ
S
Vv
l\
rT|ฃ
7 P
* ^ -
LINE DESCRIPTION
17-22
1
1
1
1
1
2
2
2
2
2:
? 0
7 1
8 0
9 0
9 0
2 0
2 0
3 0
3 0
Jo
5
5
1
3
1
1
1
1
1
/
B
c
c
c
0
E
F
G
H
9
A
A
A
A
A
A
A
A
B
*
A
C
0
E
F
G
H
1
J
*
A
B
C
*
*
*
*
*
9
*
*
*
*
*
*
A
*
*
'^//////////////^^^^^
TOTAL
CODE: 0800
WRITE IN
23-30
2.
O
F
i
c
&
'4
c
A
p
XL
S
o
o
M
e
fi
v
p
t-&
WM
e>
f}
7
7
N
71
w
a
N
'
1
J
^
o
^
mtt
G
#
T
B
r
V
T
m
A
H
0
o
e
=.
A
ft
L
1
P
T
/*
k
^
%
.,
A
7
O
T
V
X
c
$
Yf
KV
1
y
f-
ft
0
.".
%
%
G
S,
C
^
A
,
^
\/
^
m
T
Pr
ft
V
X
7
^
^
-,
U\L
FIXED
TYPE
UNIT
LB
LB
CUT
CF
C
L
B
LB
CY
CY
LB
LB
SF
SF
TON
SF
^>~
Y/t
DESIGNATION VESSELS, TANKS & DRUHS
te&
,.-
f:
"T*
/v
<
QUANTITY
30-45
^^
$'ft
e. %
Z
'/<
4
-------
CC1
ESTIMATE/JOB NO. -t>
SEQUENTIAL
PซCE# -
CC11-10
V
f
O
9
FIXED
- ป
HEIGHT
DESIGN OF PSIG
SHELL: DIAMETER
LENGTH T TO
T
THICKNESS
HEADS: NO.. TYPE
THICKNESS
PL
. SPEC.
dOUNTIHG
SUPPORTS
WEIGHT
DUG. NO.
INQ. NO.
VENDOR
FREIGHT
INTERNALS
INTERNALS
INTERNALS
INTERNALS
SUB TOTAL - 0801
SLABS-PEBESTALS
SADDLES
SUPPT. SUPE8STHUCTWEJ
PLATFORBS/UBBEttS
FIREPROOF IBS: TYPE.
TUI
_lflSULATION: TYtt IM
COVER
PAINTING: STRUCT.
PAINTING: VESSEL
JJL.
gggg
55!
ze
m
-'I
w,
g^aim^ug U^HMI
CC2-0
4-
/
^
4-
o
CODE-*
7
0
9
6
\
IL ^rygga
AREA-t
0 1
0
7
ITEd DESCRIPTION
17-22
0 G
0
1
#
i
23-49
is
L
j
' Ki
?
y
o
V
E
ฃ
/^ t
L
0
LINE DESCRIPTION
17-22
1
1
1
1
1
2
2
2
2
? .
wA
7 0
; i
B 0
i 0
9 0
2 0
2 0
3 0
3 0
3 o
5
5
1
3
1
1
1
1
;
A
A
A
A
A
A
A
A
A
A
B
C
C
c
D
E
F
G
H
9
B
A
C
D
t
F
G
H
1
J
*
A
B
C
*
*
*
*
*
9
*
*
*
*
*
*
A
*
*
WRITE IN
23-30
/
O
F
C
2.
/
P
L
V
c
o
2
e
A
ฃ
/Y
A
0
7
to
S!
N
T
&.
O
C
o
'
'
-r
N
L
i R
<>
f
QUANTITY
30-4S
/
P
i
0
S
-f
O
4
o
o
DATE
40-74
^
m
m
HATERIAL
54-00
ป
ซ
ฃ
I
e
f
4
/
^
^v&w%mv%%%.
[ TOTAL E^^^^^^^^^^^^^^^^^^^^^^^^l 1 I |ฃ>1 1>\(*
y CODE: 0800
OESI6NATI8H: VESSELS. TANKS & DRUdS
i
^5
0
o
c
^
^
ฅm
s
40
-
-
^
^
> ??
:^
SUDCOHTRACT
54-(
^^
^
^
%
f-
0
0
*
o
^
c
-f
\
4'
^^
-^
ฃ
CC75-00
i i
fe
i \
LABOR
00-74
-------
net
I" V ' V All tf* B ! ff* 'V
E DtrTAIL SHEET
CC2-S
ฃ11
AREA-*
iTCH CFSCEIfnOH
19
DATE
CC75-'-?
TT
17-22
''
T ซ ^
T
j : ia!A j ; i j ; jg:
nrrrsn i i i i M i '
\3
t* 1
I :
f
~ i I" ; ,L~^
-:n
:;IQ - FT
AID
flit
6
5
TlglK
i
I ... I, - i ,
n^i^oi ,H!P| !
^
i JD!
_u
r~
HEIGHT
i IE!
SHl^T"
1
FOl^AT.SN
;rv
7i 0. ฃ Ai" '
CY
-t-t-
I !
ซ
. ''\v^\x* i i i i i !
^r-"-
Bi*
T"l
STFUCTl'SUL STEฃL
STL PU7FMS - HCDERS
3: 0: 1
". U. I
.'.:*
2 o i
l-prtT
! i
! 1
PAiHT
!/'2..o:
+T
. . .' "* '
, '^:-;A
>..'/v-'S/'t
-------
cct
DETAIL SHEET
ESTIMATE/JOS NO.
CC2-6 I
\im-\d
CODE
AREA-*
srv.-;;mM.
pitt*
W?MO
!TtH
10
DATE
CC75-80
J7-22
sfoirf^
23-45
W AITE
l'?E CE'T?!;1
PX23
L>
FIXED
i MP. or
_J_fja^-EL_
-r-r-r
Ai
AlB
A^
HI
J__..J>B'l=ij.
17
i i/i
i^ojo
00
u>
2iJ
6-P
o
N
T
N
TY?E
USiiT
5
QUANTITY
33-45
\
2.
iM
46-74
WVMZZ&sZM
i't^MU
MATERIAL S SU8CS?!7KซT
uses
43 |
I I *
J\L 4+o\o
\ r r
T-t
p! *
tH
-i!t-
Ifi'
4-H-
: i
! !
(: *
:_VQ!ปE.MW|CL
HP
Ji!
\
JI1_
i : !
I ! I
C
4i-
I |
2
TTT
mu
*
cy
^
_C58LRS!LDOSaJliQL
*r
1 :
STfcWTWWl ttKL
STL PLATFIS -
A!*
0 3
A
i
I^JLATICV
2| 21
PAIKT
!
30
JLUM.
TTTcTTT^
i
n r
j ; L
IXฃI1
_1-
8f~ฃ.
'-'j -:=Iฅ[RS
1777
-------
CC!
ESTIMATE D&TAIL SHEET
E
CC75-5P
V7T
-------
CC1
-
<
St ,
i , .-
' TON.
NO. 0
UrtO^f-
: stoT
EST! MATE/JOB NO. -J
I
- - - r.. t f >'.:' f. *
:. Kit&L &vป IMS
r* *!p!-u!/M
. , ;
~
^
17-
:i
cc?-
i !
22
!' *
> 1 17-22
.PlปP
F PIKES
Pcucft
* FT
-J
(
i
1
-4
i
k
i *
P
i
i
LjWOg
;
;
' V&tlt
<
.
\~Wvl
flGNOE
1 jflux
HOKEflWEft
NT
USEftVICE
IATIBI
JMtlSIEEL
i STL PLATOS - UWRS
1
1
Lisas
jPiim
i
1 piui
i
>; "
i - ^ . -
ATI Of
:...... v M::. ฑ:.'.^,..
f - .,
- H
1
1
i
i
r
|
!
i
!
1
|
_
i
i
-;-
/! 0
1
i
A
-J-
fj
i
t
B
4
O
1*
5
5
1
fV
L
^
J
1
7
CODE -H 0
^/>9!ฃ-!ฃ
L!
t
i
\s
! *.ffi
rl
1
E
TT
i
id*
h
"
.
.
1
i *
i*
Pi-'
1
.,
11
: j
; 6: 5
' ?! ?
'
E! D; i
C' '.
0
i <
21
2
.
-.--
2|0
3|0
'- C
i
' T
f ~
:.
1
1
> l
-I
b
rfE 0
ES
C
i
X
d. f**(
RIPl
.->
I
9
"23-45
0
d
u
-,
'!"?
ป1
S.'4
ds;
f !ซ
13-33
xj<2.
-i/^
(
3
i
i
i
""! '' {3 ojo
c
1 1 > i <-,':-
i rr i CiC
ฃ
G.F
' ^TD
T^
i '
4
\
o
i
0 j
i
M
i .
ฃ
(
ri
(l]
ซ
i
^
,
:IAIL 5
AP!7A-<
9110
:OI7
Nfc
:fe
s!
h/Wr|fi
IFIXEC
n'?r?
! U?:!T
:*
cr '.
?>
P
M\P
MTITY
-(
5
1
DATE ["['1 '/''rTl
43-7* ] ^,
^^
'
i;'
ffW
rsr
.!
L
I 1 / ~R'E:><3 '
I 'L 7
; t
/A/
pi i
!
hrt/qii.
i
i ! ! ] ! i ! T
i*
m
!
j
1
1*^
*
; '
A!
ป
t
n |
'A!
,M
.s
-
.;
i "
r
i
\
;
i
i
.
i
j
I
j
i
i
T
I
i
i
i
:
I
i
)
1
'
I
j
!
i
t
f !
i
1
j
1
i
1
~
;
1
1
i
i
i
!
-.-T-
. t .
i
' ./ .
rr
t
*"
rT
t.
*
j- .'t
cy
&
^fiiS.
j
j
! : ' -
i '
i
i
1
i i
M i
! :
1
__
'
1 , .
j
I i
7
0
ป
W*
?>X''
r-fx.X
f:
'/S'vCWXV'TTKS-TJ ' ^
f/rZW&.y.-tfiq.
4 !''. .. ^.:1' : >*' ;
O{ / ^ ^d
t i r~7~! ! -"1 ~ '--'K,.
J ' : i . ' : !
; i
"*;!!
' : ' ' !
1 , : i ) j . . :
\ ; ; ' . , | ! ' i
; ; i ; - ; . 1
! 1 ! . ! ' j j
i j ' ' : '
i i 1 : ! i ' : | !
i ' i : i j i , . :
i i ! ! i i ซ MM
: ; i MM
;
i !
! i
- 1
i
\3
I
j
t i
7
'
i
.
i ; 1 ' ' I '
! ! : ; j : ' : :
! ! ' i i i i i
. i 1 i ! !ii
i M ' l ! s M
i 1 ; | , i : i | . :
l ' M : ; ; . ; '
i ' !
i i M
/
2
c
' :
i '
ซ
o
i ; ;
I ; !
i
i. 1,..- .:i;-'iij2i4iviii^'-i^4"_.-.l.
..:'i^'..:
' j^
>.ป 1.
^-
'2
V
1
i
: ! : i ^^ I!'-.'
MM; ; :
v -*-4 ซป ป | i i f^o
Mi ; i ;
i : ' ' ', i i
' i ! i i i :
! I i ;
! i
1 i
! i
i i
': 1 * i i lo O
;''!.' i ' ' : '
_ul.
i M
' ' i ' : ' '
i i 1 , i M :.. ' :
-- -V- ;-^.iii:r ;^ฃVtf
O1 $0
T77T
-------
CC1
fc^MMAIt: UtIAIL 5HEtl
ESTIMATE/JOB NO. -*
SEQUENTIAL
PIECE # -
CC11
-18
FIXED
.- .- .-
BARE PIPE: CARBON
STL
ALLOY
OTHER MATLS.
VALVES: CARBON
STL.
ALLOY
OTHER MATLS.
FLGS, FTGS: CARBON STEEL
ALLOY
OTHER
MATLS.
SPECIALTIES-TRAPS
ETC.
SPRING HANGERS
EXPANSION JOINTS
SHOP FAB'K. - VDR
CARB.
STL
ALLOY
ERECT. UNDERGROUND PIPE
M/H TON
ERECT. RACK PIPE:
CARB
. STL
M H TON
ERECT. RACK PIPE:
ALLOY
M H /TON
CC2-6
4
1
ซJ
4
0
CODE-*
7
1
i
3
AREA-i
9 1
0'
0
7
ITEM DESCRIPTION
17-22
1 3
0
1
#
#
23-45
LINE DESCRIPTION
17-22
1
1
1
1
1
3 0
3 0
3 0
3 0
3 0
2
3
4
5
6
A
B
C
D
E
F
G
A
B
C
D
E
F
G
A
B
C
D
E
F
G
H
1
J
A
B
A
B
A
B
C
D
*
*
*
*
*
*
*
v////////My///y^
TOTAL
CODE: 1300
WRITE IN
23-38
%
H
F,
j
1
rt
p
%
P
i
A
3
\
i
1
\
j
j
\
%
h
^
y/t
i
%
%
!
#
%
%
"/.
L
%
1
%
V,
A/
^
ฃ
^
^
D
^
ft
%
FIXED
TYPE
UNIT
TON
TON
TON
TON
TON
TON
TON
NO
NO
NO
NO
NO
NO
NO
UNR
UNR
UNR
UNR
UNR
UNR
UNR
UNR
UNR
NO
TON
TON
TON
TON
MH
TON
MH
W&
"/M
DESIGNATION: PIPING
QUANTITY
39-45
%
%
/
/
$
V
ฃ
O
&
?
y
ft
h
^
%
r
i
H
%
v;
DATE
46-74
gj
%
MATERIAL
54-60
\
f
?r
^
z
o
9
47
0
6
tf
cT
'/ ;
/
7
l
1
X
^
0
(9
O
o
o
0
o
0
i i
< \
tt
/
^
fa
w
Y<
S
46
t
i
%
%
y>
SUBCONTRACT
54-60
fy
#
^
ty
\
fa
%
CC75-SO
t
i
\
i
LABOR.
68-74
' J
!
i
\
1 I
j
r^
j ; i
J I
ffifa
\
1 SHEET OF 1
I^OO
V7T
-------
"
ESTIMATE DiiASL SHEET
ZS7IMATE/JG3 NO.
SEC/JiBTiAL
CC1M8
III 1
ill 1
FIXJ9
,. _ ..
ERECT. ALL OTHER: GARB. STL
ป.H'TCN
ERECT ALL OTHER
MH'T
FLD. SHOP FAB:
: *ttt*
ON
CIS8. STL
M.H/TOH
FLD SKC? FAB: ALLOT
M-'T
TESTIV2 WELDERS
?!
7"
PIKG SKETCHES
?.?. PiP'NG
0*
PIFE CASTINGS
C.l.V. FOR UV-?
COAT i 'ซRAP UND
. ?ir;*8
CRO. PIPiKG
S-.,
/> .ป
t^
8 TOTAL - 1300
KG. P.S. 100'.
FLO. FAS.
1K!C. FCN.
PIPE WVY TREKCH?S
PRECAST PS.-
Ff
! ซ.'
S!
P
ECiST p.S. -
FAS'K. OSLY
EPF.CT. OHLY
Fฃ SUPP7. R!Gซ!0 HGRS.
.-.I t , r-
ALL StiiPES -
PE MCKS - ?F
SEF^CQF. STK
u r '* c
FLD. FAB.
cp|g
STL. P.S.
PIPING INSULAT C?l
4L
ih
4-1 o
CODE -*ป
7
.1
ซซ
1 2
AREA-*
9 10
01
iUM BES--fl!PT!OH
17-22
1 3
0
7
#
n
23-45
i ' i
1
!
1 !
j 1
LI?fE DESCRIPTION JFIXED
17-22
;
,A *
i
)
i
1 3
i 3
1 3
113
o
8
019
1
J
i 3i4
iT
1 7
7
7
7
8
8
3
1 8
1 9
4
0
g
i
u
]
1
1
3
i
0
n
Ll
3
8
1
2
t;
^
5
Oii
"ol?
0
2 21 C
i
1
2 3 i C ' ;
: T
^. V
2 4
i
^'^&Z%-3%%&
.0,1
0
1
^
3
^
i;
*
*
*
E *
l
o
'J
*
WRITE IN
23-38 j
(
;
*
K *
A
A
A
A
A
*
*
*
*
*
A *
9 9
A
*
A ป
A *
A
*
Ai*
8 *
C*
f. *
A *
A *
A *
el*
A '
fe
!
'
3
7*
*i
oq-iAl|W'
olo -Iw
i
i !
i
1
1
H
i
i
i
'
!
I
j
1
; i
; : i
i
i
i
i
i
!
i ;
i
i ,
i i
*,
1 i
i
;2 o
;
i
1
N'
1
i i
1 i
1 !
|
,
i
|
WE
UfciT
TCH
m
TON
m
TON
KH
'T;;-{ I
'rid
J:PL
EA
J.DL
LF
CY
LF
CY
CY
CY
NO
LB
1 R
LB
L6
i i j CF
\ ' ' : '
< ! , ; ' ' '
1 ' i '
: ' | : , l
: j ! i !
i
-
i
i !
W^W^W^^^^7'
LF
TlK
TC*
-.PL
!
i
QUANTITY
32-45
t
1
' 6\t
1
j
'Q
?
\TH
\
\r
'N
> i
\ \
\
j
i
t
i
;
f hi
\
i
!
!
rtsioo
\
O
#
i
i
i i :
rrrrfYf-frf
MATE!
(IAL
54-60
r
i i
f-
j
i i
ij
**
(-1
ซH>
Wtoป
' ; i
' ! !
!
j
' {
I
i
i ' 1
1
i
!
i
i
1
?3'p &.0
\
\
i
' * 1
; , i 1 !
' 1 i !
' i fi7\L i
\ \
'*''":&
!
>';-.V7*-ป3
-iS^M't-r-ii
--*.-
4
1
i
i
(
00 10
4\O\O
t=d
SS-74
/r-v>"r-.
1','%
ulil'
S
*!
S'J
DATE
C'T^?^^/^;>;-v?>/.v:'
vfaz&timz
SU8CCMTCACT
54-60
f-
1
+ซ
i
1
-4
^
' ป
f-
i
^i
*""l
1
.. >
| rfit:. /
' ,ซ w * ,' '. .1
i ; i ! i i 1
A.
.. j
ISXR 1
A- 71 !
i ''-/"f&dtefil
f ]-*--^ nr*t|
i : t i - J j
i y^jtfoj^
i w^rjv'i
! I r i
i '
i
1
i i
i
I
i
!
!
; ;
i '
'
i
i , ; i ! .
' ; f
i ' i !
; ! ! '
i . j ; ;
: ' !
j
i
!
I:;-.)
- ! ; ! I
M ; ; : i 1
! ! : : | j
i : i
i ! < \
t
i i ! ; I
i i ' . . '
.
!
; 1
/'~(o doc.
/:2 ^&0> '
'ZZ-'V&T^
t^a-i-J.i-^ ;ซL
Icc*'- "' v'ji '' i'.1
i c:sfe is co
PIPIN
f:t
-------
CC1
ESTIMATE/JOB NO. -*
SEQUENTIAL
PIECEi - -
CC11
-16
FIXED
. *
INSTRUMENT BOARDS
8D-MTO. INSTR. -
ANALYSIS !NSTR
ACCESS
FLO
FLOW IHSTR. FLO.
LEVEL IHSTR. FLO.
PRESSURE INSTR
. HTD.
HTD.
HTD.
FLO
TEUP. INSTR. FLO.
KEIEH INSTR. FLO.
. IJTD.
HTO.
HTO.
COW3UST10K CONTROL
CONTROL VALVES
SLICE CHOPPER PLUS
VALVE POSITIONERS
- PRSD.
VA
BUTTERFLY VALVES
RELIEF VALVES
A. FILTERS, RE6S.
ACCESS.
.A. TUBINS i FITTINGS
.A. SUPPLY
A. CHANNEL &
IXSTR. PROCESS
SUPPTS.
PIPING
INSTR. HOUSINGS
INSTALL. CALIBRATE,
ST-UP
INSTRUMENTATION SUBCT
SUB TOTAL - 1500
FTGS. I PIERS
CURBS & LEV. RAH
PANEL
PIPING IXS'JL. SIHTERIZE
?
HINTING - E"!!
P
PAINTiHG - PIPE
>J
'ma^.
'
r
-^
\ CCOฃ: . ::
ฃงymAiiit yฃU^
CC2-8 |
4
; 9
4
d
CODE-!*
7
1
1
5
\\
IL ง>IHII^T
AREA-*
ITEtl DESCRIPTION
17-22
1 !
) 0
i
f
#
23-43
E
f
>A
*
/
N
S
7
'fi
\o t
A
d/v
LINE DESCRIPTION
17-22
1 !
1 I
1 !
1 !
1 ซ
1 '
1
1 '
7
L
2!
i 0
) 1
> 1
) 1
} 2
5 5
r i
i }
1 0
3 0
3 0
', i
3
i
6
8
0
0
0
0
1
1
1
A
B
A
B
C
D
E
F
G
A
B
C
0
E
A
B
C
D
A
B
A
A
9
A
B
A
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
9
*
*
*
A;*
B
*
!
,
WRITE IN
23-30
' : i
i
i i i . ! '
- ' ! : ' ! '
'#/>'//'>///"'// ' ' y'^V'V///ฃy "';/'-// '"' '////>//
y&^'jtf/^-^^ ^|^f'^;';^1^%a/^^
y/h
w<
7*
9 1
, ^^\
0
7
A
FIXED
TYPE
UNIT
LF
NO
NO
NO
HO
NO
NO
NO
NO
NO
NO
NO
NO
NO
UNR
UNR
UNR
UNR
UNR
UNR
*HC
UNR
CY
CY
LF
TON
TON
^
t
?m
DtSISWHTIOH: INSTRUMENTATION
r 7
' / <
D
*l
QUANTITY
39-45
.
.
V
N
i"
T
ffift
tiffif
p:
ฃ
ฃ
^
G,
ft
-t
i.
L.
ป
p
.
1
*ff
v2
^
^
DATE
46-74
V
Y'<
W/'
MATERIAL
34-60
t
&
/
/
^
^
j
%
7
o
0
o
0
0
i
1"
i
o
0
Q
0
4 o -4
!
i : '
wzam
Y<
S
46
i
^
Yf
^^
%
SUBCONTRACT
54-60
^
\
1
U-
\r
\
.
/
4
M
<
ซ
^
ซ
^e
^
t^
! ! i ! !
-J r J--H-
' 1 :
^^fei
[
1 CC75-8C
I
i
<
k
k
LABOR.
68-74
e
__
0
a
0
^
t
C-U-
.
_1-4 'ซ=.ซ
i
!
'$$$.
1 ! '
'fflftffifa
ZO'O'1
SHEET / OF /
Q
7777
-------
CC1
k5IIMAII: UbIAIL SMtbl
i
CC2-6
ESTIMATE/JOB NO. -*4- 1 i'fRlO
SEQUENTIAL
PIECES -
CC11-16
i
i
1
FIXED
- - ..
MOTOR COSTB3LS
PC :R vr:Pi?iG
LIGHTING SYS7ES
GRCliWjllG SYSTEM
TELEPHONE & CCM'JH. SYS
ELE-rmc TRACING
SIBSTAT'.MS
;
SSTRlii^MT *'!R
SC
GEXL. ELECTRICAL ซATL.
ElEC. SUOKTRtCTS
T
E"P. Pi I. K*
TLS. CCCO.
POSER BILLS
TEXP. F i L SU3CGST.
SUB TOTAL --I600
M
SC. ELECT. S
UPFT. FTGS.
DUCT EKCASEX.ENTS
E
LECT. NAMKCLES
STRUCT STL. FOR
I f A ! !:.';} k - $75
uO
SUPPTS.
'. SI
L.
CODE-*-
7
1
8
6
AREA-*
9 1
0'
0
7
ITEM DESCRIPTION
17-22
1 5JG 1
#
#
LINE
17-22
T 1
1 n 0 i *>
i > G - J ' *.
i ' ]
!
i
Ija 0 5
1 i ,
i
1 6 1C 7
'. 6 ' G : 8
i !g|n ;g
! i i
i ,
1(6 i ;9
i :
; j
i i
; \
n7 ro
i:7i2!9
11712 3
1 B 0:1
^ ' r r : ป
i L : J w > i
i FAiSTiN? - EQUIP.
-o
"T
FAlKTiSG - CO1
^ 1 1
T
2 5|0|1
2 2 O'l
i '
!
i
i
>(
-Tr7:'.r-77
ji."
'/'"'
L
-X-v
. ] i
1 '
t
! I
* - 1
- . '
A *
A
*
B'*
p
0
t
*
*
*
A. *
B
0
A
A
*
*
^
*
A."
S
A.
*
4
s;*
G
9
A
A
*
g
*
*
A *
A
rt
B
C
*
*
*
*
ft
^
23-45
1
\
DESCRIPTION
WRITE IN
!
23-38 '
.1
1
l i :
l ! :
i !
\
\
1 ;
1 i
!
\
i
i
j 1
i i
, ;
ill:
i
i
i
!
i
i
i
i
i
!
n
f
, I
'
i
i
l
!
t
i
l
i
i
i
i
^_j_
1
; i ! '
i j j
T ' " J
SS
tt
S
't'-V/,
7,
' ,:.:: 0ฃi;a*AT!OX: E'LFCT
%
%,
. I
i, i
!
i
i
Wi^^m^.
1
1
i
FiXEO
TYPE
U?IIT
HP
UNR
!'NR
UNR
UNR
GHR
KVA
KVA
KVA
UNR
UKR
UHR
UHR
UNR
UNR
UNR
CY
CY
CY
LB
TON
TON
TON
^JTC
RICH
QUANTITY
39-45
1
1
i
!
t
!
i i
I
t
i
i 1
i
t '
t
|
! ' s ! ' i
\ ' 1
^
;
'//
46-74
%
Wffiffiffi
MATERIAL
54-60
C
/
z
^
2*
i '
ซ
-
0
^
0
A
0!0
2io
h-,.4^
-k i
* S
0
o
0
0
K
*
^
!
i i
!
J
2
, j
0
0
1 :
9
.
I l
:
, -
t
010
1
i7oo
\
\
' ' I '
i 1
; ' ; i
''/ss&ffis<'Z;%~ '
^
/
V '
7
fy
o
S
46
-
-^
DATE
rs
$
1 CC75-&0
n i T i
i '. 1
I
; i i ! ;
1 . i !
1 ; i i '. {
- ' ' i =
' ;':'!
'' i
i ; '
:
1
' i
i
; i
!
J
)
; . i
'.3200;
; ' -. ; ~ i
i : ; i : i
j ; : i i i
' ! ' ' . \
i ! i ; ' i ฃ J?iO:Oi
i '.
. i : ! i i
' , ; i ; ; . j
; ; ' '' ' -
', 1
1 : ' i
f
'
.'> 1,
-
^
c
:
'.-.
-.--.-,-. ....,,, ..
; / / $*-3CO
~^: "T '' ' '
-------
CC1
CdM/WMIC UtIAIL 5Httl
ESTIMATE/JOB NO. -ป
SEQUENTIAL
PIECE!
CC11
-18
FIXED
- to -. .
LG-NON-BM. SLABS (FORMED)
LG
IG
LG
.NON-BM. SLABS (NON FMD)
. BEAMED TYPE
SLABS
. COMPR. SLABS & PEDS.
SLABS & PEDS-VENT
BLOG. FONS. CONT.
FLOOR SLABS AT
VESSELS
WAU-FTGS.
GRADE
PUMP & MACH. FDNS.
COOLING TOWER BASINS
FTGS. & PIERS FOR
STR,
CIS
MULTILEVEL SUPERSTRUCTS
SMALL SUPERSTRUCTURES
PIPE SUPPTS. INCL.
FDNS.
HORIZ. HTR. i BOILER FDNS.
SADDLES FOR HORIZ
TANKS
SEWER IAMHOLES
SM
. SUMPS & CATCH
BASINS
PIPEWAY TRENCHES
ELEV. PLATFORMS
&
ROOFS
ENCASEMENTS
FIREWALL W'FOOTING
FIREWALL W/OUT
FOOTING
LARGE CONC. TANKS
OUTSIDE PAVING
_R_ETAINING WALLS
El
Fr.TRir.ll MlNHOLfS
SIDEWALKS
PRECAST PIPE SUPPTS.
ROADWAYS
DEADMEN
CONC. DEMOLITION
CONC TANK RINGS
>
w///mm
W
W<
W
^
W
CC2-8
4UI9IH0
CODE-*
7
1
\
7
AREA-*
ITEM DESCRIPTION
17-22
1 7
0
1
*
*
23-45
LINE DESCRIPTION
17-22
1
'
'
'
'
'
'
1
'
1
1 0
0
] 0
1 0
r o
1 0
1 0
i 0
1
1
]
'
1
f
1
f
I
f
/ 2
7 2
7 2
7 2
7 2
7 2
7 2
/ 3
7 3
7 3
7 3
/ 3
7 3
2
3
4
5
6
]
8
9
0
1
2
3
4
5
6
7
8
9
0
1
2
3
4
i
*
(
1
4
C
6
Wffiffiffiffifffl
TOTAL
3 CODE: 1700
WRITE IN
23-38
//
'M
P
S
j
L.
rVi
/v1
p
E
#
k
g
&
V
K
p
^
%
6
E
$
h
^
i?
#
.
i
^
$
h
p
*
&
ฃ
fy<
ft
K
ft
%
k
'/<
'/<
9 1
i
0
FIXED
TYPE
UNIT
CV
*
di
a.y
cy
oy
ws<
m
DESIGNATION: CONCRETE
QUANTITY
39-45
ty
r\
'4
6
ti
^
$
/
f
/A
k
s
p
3
P
DATE
46-74
MATERIAL
54-60
#
ffa
Wi
ฃ
1
ty<
4
1
7
/
/
7
S
4
2.
^
?
O
^
O
X
%
0
ft
S
48
-
^#
W,
%
%
r
SUBCONTRACT
54-80
ซ
40
ฅ;
0M
M
M
> 4
-C
ซ
C
k
>-
^
ซ
^
MM
M
ป
:
ffofyfe
\
CC75-80
i
t
\
i
LABOR
88-74
l
i :
$ฃฃ%
/
/
t
fa
/
^
3
o
<>
f
i
1
0
c
o
c
22%
1 7\93ป0
SHEET OF
/ 7OO (zKOJf 3Z7T
-------
CC1
ESTIMATE/JOB NO. -*
SEQUENTIAL
PIECE*
CC1M6
FIXED
.- __~
SUPPORT SUPERSTRUCTS
P & L FOR TWRS.
PIPE SUPPRTS. &
&
VESSELS
RIGID HGRS.
PIPE RACKS
STEEL .DAVITS
JIB CRANES
MONORAIL (INCL.
STRUCTL)
ELEVATOR STRUCTURES
STEEL DEMOLITION
STRUCT. STL. SUBCONT.
SUB TOTAL - 18
TROLLEYS & HOISTS
LG
LG
LG
. NON-BH. SLABS
(FORMED)
.NON-BH. SLABS (N/FORHED)
BEAKED TYPE
SLABS
FTG. I PIERS FOR STR. COLS
HULTI LEVEL SUPERSTRUCTS.
1 -LEVEL SUPERSTRUCTS
FIREPROOF STR. STL.
PAINTING-STR. STL.
/^^
Wt
fcMIIWABIfc Ol&TAIIl SMEET
CC2-6
4
1
?
4
O
CODE-o
7
8
8
AREAH
9 1
>0
0
7
ITEM DESCRIPTION
17-22
1
810
1
#
9
23-45
LINE DESCRIPTION
17-22
1
1
1
1
1
1
1
1
1
1
1
1
1
1
2
8
8
8
8
8
8
2
7
7
7
7
7
7
9
3
j
0
5
0
0
1
0
0
0
0
0
1
1
1
0
0
3
0
7
9
0
5
1
1
2
3
0
1
2
1
1
A
A
A
A
A
B
C
D
A
A
9
*
*
*
*
9
*
^^^^^%^
TOTAL
CODE: 1800
WRITE IN
23-38
%&
ft
L
(^
^
/
1?
i
^
A
H-
T
ii
^^^
^
T
i
N
Q
6
T
t
2?&2%2
^^^
L
/
t )
mftt
met
10
\
%
m
0
w>
Yt
&
M
fa
Yf
FIXED
TYPE
UNIT
LB
LB
' LB
LB
LB
LB
LB
LB
LB
LB
NO
CY
CY
CY
CY
CY
CY
CF
TON
W4&
W//&
QUANTITY
39-45
%/z
m
tf
(p
7
fa
w
0
5
vy
O
^
T
^
ff\
O
r>
H
vj
A
DATE
46-74
*
'i
I*
m
MATERIAL
54-60
M
ty.
fo
z
ฃ
'4
s1
/
^
%
?
&
0
22
d
0
o
-------
CC1
ESTIMATE/JOB NO. -ป
SEQUENTIAL
MECEt
CC11-1I
z
FIXEI
ซ. _ ป.
flBUfiUiOABJNC
TIN 111! QRABIIIC
BLACK"W UPS. i PAVIN6
IHttfc. BWr*OIMC
RAILROADS
FWmrt
E*
m ones
- BIOOINB TEST IIQLCC
Of
AgriMM^AM
[F ICLto
i . nn; nunuo
. ^HIILS
SITE IORK SUBCONTRACT
_ IliJi c
>Np
LINE DESCRIPTION
17-22
2
2
2
2
2
2
2
2
2
2
2
1
0
0
0
0
0
0
0
0
1
1
5
7 1
7 2
7 2
7 2
7 2
7 2
7 2
7 3
2
3
4
5
6
7
8
9
0
1
0
7
1
2
3
4
4
5
e
B
C
D
A
A
9
B
*
*
*
*
*
*
*
A
*
*
*
*
*
*
*
g
%^^%%%!%^^
TOTAL
CODE: 2100
WRITE IN
23-31
C
p
tt
b
$
Q
F
R
K
L
x
L
U
K
U
I
IS
0
/)
ฃ
ft
r
f\
f\
v
V
/):
ft
ฃ
^
^
&
ft
ft
%
^
ti
%
?
^
^
P
F
/
r
^
/
A/
J
fi-n
/h
1 r
n
^
^
I
fa
/
^
rป
01*
r
.
i
^
^
i.
ฃ
^
e
i
FIXED
TYPE
UNIT
SY
SY
SV
SY
LF
LF
CY
UNR
UNR
UNR
UNR
UNR
UNR
UNR
UNR
CY
CY
CY
CY
Ct
CY
CY
CY
w&
"/M
DESIGNATION: SITE DEVELOPMENT
QUANTITY
31-45
3
i
f
y\
&
1
^
fy
h
3
z
6
4
\
%
%
0
0
9
*
/
2,
+
t
ft
w
0
0
s
46
W/t
^
SUBCONTRACT
54-60
^
f
7
^
1
i
fy
fy
3\(o
7T
X
^
^
^
^
7
**
?-
o'
(t
%
f)
i
&
*
0
^m (
^
4
0
0
0
0
(7
0
0
ซ
Q
o
o
o
f)
f)
ft
0
m
o
o
Q
0
o
c,
o
I
^
0
tyt
0
h*
/58C
i
t
1
I
k
LABOR
68-74
^
^
MB
ซ
ซซ
^M
"ซ
ป
ป
ป ซ
1
^
.
ป.
i
^
ซ
^J
SHEET OF
-------
'JSTOUER
~ IvC^T'ON
- CODE
G'3Q
- 0200
0400
0500
. 0600
0700
OBOO
0900
1000
i'OO
1200
' 2500
2BOO
1900
- 3390
3 ICC
-32,00
j40G
-
1300
1400
1500
i 1600
1700
L IBOO
1900
! 2000
2100
2200
2100
! 2400
- 2600
2700
3300
- 3500
3700
-4*09
00
1300
1300 1600
: Jfflflo
2100
r T
SUB-SUMM
^/0\MOiOMf5f\J77lL tftOT^CTiOk) Ac
O IKilA./1/i iO a u r At A
*-/*-* i\H/*ป f| * |\J 0 r\ 1 f "I V^ ,A"/> C/L^JKJ A\
DESCRIPTION
FIRED HEATERS ANO BOILERS
STACKS -
REACTORS ANO INTERNALS
TOWERS ANO INTERNALS
HEAT EXCHANGE EQUIPMENT
COOLING TODERS
VESSELS. TANKS. DRUMS ft INTERNALS
PUMPS ANO DRIVERS U)
BLOBERS AND COMPRESSORS
ELEVATORS. CONVEYORS. MATERIALS HANDLING EQUIP.
MISCELLANEOUS MECHANICAL EOUIPMENT
TANKAGE ( > )
FILTERS. CENTRIFUGES. SEP. EOUIP3ENT
AGITATORS ANO MIXERS
SCIMSฃtS & ERTRAtaENT SEPARATORS
OOltt TMLS ft QACHIHE SHOP EQUIPMENT
HIK^G. VEN JLATION. AIR CONDITIONING.
?ii*T CONTROL (Process only)
PAC**6ฃ UNITS
SUB-TOTAL - MAJOR EQUIPMENT
PIPING
SEDERS
INSTRUMENTATION
ELECTRICAL
pAHI*Ot 't 1" ! ^^^\ A V
wUHvnC " L K \J tj /
STRUCTURAL STEEL
FIREPROOF ING
BUILDINGS
SITE DEVELOPMENT
INSULATION
PAIHTINC ft PROTECTIVE COATINGS
FIELD TESTING
CHEMICALS AND CATALYST
PILING
FIRE PROTECTION
MISCELLANEOUS FURNITURE FOR PLANT BUILDINGS
SUB-TOTAL
MISCELLANEOUS DIRECT CHARGES
STOREHOUSE ACCOUNTS
CONSTRUCTION SUPPLIES ft PETTY TOOLS
TESTING WELDERS
TEMPORARY PIPING ft ELECTRICAL FACILITIES
TEMPORARY CONSTRUCTION BUILD NGS
TEMPORARY SITE OEVELO "MENT
0 T A L 0 1 R E C T C 0 S T S
A R Y
36,Ajty ESTI
MATERIAL
30^00
0
30,900
ฃ0^2.00
2 ?
3 ZOO
2.6,tiO
2JOO
-
S?O
3OQ
.
r
I2.Z,S5O
BATE nMl*o
nปTF
"Iff
LABOR
. 7.OOO
-0
7,000
4J.ST3C
') /oc
J\3OO
9 S~laO
2\1OO
-
2..-2.ฃ~O
2, 7OO
80,310
(r/cr.rh,\\
DF
SUBCONTRACT
-ZXJFoe
2?,SOo
ie>,*oo
-------
CC1
!
F
j
J
I I.T
i 1*3
1 F
| W
kMIMAIfc UfcTAIL !
ESTIMATE/JOB NO.
rsygKTlAl C51M*
;;.;ฃ* ,. P\/\o\fj\^\0
SHrfcl -r75.M
ป^ I I la (So 1 _ซV/3 W||_.
to
ฃ
ITEM DTSCJW TiCN
17-22
pj9 on #
'" L "' " ^ . ^ - J ' '* ~ '
! >. fc. ' i
,. .. \ 57-22
9
/
s
I!"'
iiK4.ft** i i i ; i*l*
i~f PIECES -' 1 | '
3rEj>uซฃR.
m
HtAD - ft.
Wlป ^SEPOKB
> i ;
! >
i ' !
Witt NaKFftUft ! !
'
TR
VF
SCCnf ftFKfitlTlQI 1 i 7 31 ?
STRUCT WIM. STEfL
STL PLATFHS - LADDERS
INSULATION
FA, INT
t|
|
;
1 8 Oi 1
1 81 0L 3
J
Z 2 0|1
2! 3i 0; 1
7 7s f| *;
S :
A>
t
0
A
A;
B
i *
> *
i
.V *
' 1
!
i
t
I
ci
/
(tL'P
A
f{ C
i
H
/>
/yj
Z>j ^
/v
j i
/I
A
i
<'ซj
a
C
r
1
o \o
i
i
N
' ! ^
T
/?
|
\
!
i
1 ^ T 1
^
i 1 ; ;
i i i i
f
J j
; ] I l '
'
\
1
i
\ ;
\ t
I
__
i
i ซ
i
. |
'
i
i i
i !
~1i>
C
- XP^H
CIUST1TY
I:;;T i <
i
i
i
cy
,
1
i-'.j
Ji i^?HE
~S
a
f i. _-.
MA '"lAL
:
<5J
I
!
!
i
1 ' n
i
i ;
: :
i <
1 ! i
I
;
i
~["
iii.
i t
i :
i
t
i
t
:
J
i i
/
[
i
' : i
-r__
"---
i
;
!
i
DATE |
a
46-74 *
f
r-P^
'ฃ&&% '?'$$
s'JE'nr.T:-. :/.T LA'OS
. ,. . . ;.;;.
i ' T i
^^ -r- ฐ -*^* 4 2-OG
1 ; t
1
' ' i
~^:
i . :
!
j
13
i
40
' i ^iO
' ! ' : i ' i
i : ' r 1 ; , i j ; ;
I i ' - I ' '
i I ! ! ' | i
I ', ' T ; i
i : i ' . I"
! j j i ; ! i |
i i ; ' 1 ' ' ' i
| ! ! : - S : i
I * ' * ซ
i i
i ; ' i , ; :
i ' = i : ' - : :
, ; ; , ' i :
1 i : . ! . . '
i ; ' : '''
! i '
1 '
i ,"* ""^ ! >//ฃ>&&
i i ; : i : ''
i ' i i : ' : .
; ! ' i ' ' ' I :
1 ' \ ( | :
r 0 7l5*O
! ' ' 1 ! ' ! '
I , 1 , (
i i .'
! ' :
i . ' ' '
-w-r*
i
-------
en
EST!?.! ATE/JOB NO. -*
1
CC2-6
4J/ J9J<ฃ|<9
, ซ
>
1
1
1
v
kSi
fe
CODE-*
7
P&IAI
TT
019
II SHhE
tป V I B Pa dm
AREA-*
ll!
ic\
0
?
* 1 i t.*7j J ป. .* . > I'/JY
c
Eฃ:JEU7;*.l I CC11-5J
r-;ut:v ~!p[/ic?iy|A^!o
;
,
?
"'}
r-vjg :
r, ^ ^
r.>;_ '..";? !
-_ r ; ' !, v ป1 -i ;
"^i ?'. ".:i 1
ฃ?S
ur
:? '.
I"; - :T
*C; F""S:"?o;?^
!
rr:S[ *(' '.!.''."]iH ' \
rr
7 1
-r =
r r
U ',
' ; r < T . ;
" ' * i
! ;
H3ซ5 --^'Vl-LE i
|
i
i ;
!<-.!?-ฃ -J'lni |T|.-ปj
STF-.!-:T:J3>L STFEL
STL PLATFSS - LHOOERS
IHSIJUTICH
Pi INT
?
!
vJ/^"V*7
iT
_!!,.;
i!
i'
i
i
i
9
j
7-22
O i
'!-
j
. 1
i Uiซi
' \"r
22
~
1
t
"^ j
1
'
7iC
7
e
A
i
2
' '
! ->
v'-vri;""^
3
Ti
210
J
7
r,
.^
. .ป-
- - ; n : ;
*1
'AJ
A
2|v|t>
1.1
a
A C
A;
n
|
}
r*
*
*
*
t *
"F
:-i
J1
K
,
S
A
SlA
E
1
2
1
1
f
*
IT
*
*
*
A *
A *
8
A
A
Ti'T
j
f-
~
*
*
*
*
/
P
&
'
IrixE
v.-y
^ ^-
^
^
.
/
j
i ! i
i ' '
!
J
^
/
c
0 0
;
^;T
1
i,ซ:a
;
ฃ|^iN
i
1
' ; ' '
i
i
\
^
!
1
i
i__
1
i ;
i
i i
1
i i
i
: : i
t |
!
i
i
1
i
i
_}'', ' \
i
,_
i . ''
:;-'ATi^3:
.~.
r ..
f'j
-
1
'::"' ''
AHC DP V-:
ns
^
i
i ' ' i
!
7^
7
"^y
?
1
, j
*kjo / /
0
E
f
>
.
QUJKTiTY
i
f.:}- irf.-*ljjU<.Ot/.
/
2
t^iL
i
: i
"^^ i i ~[ i
\
\ \
, i ! ! !
\ \
i i ': . !
; : ; i
i : I ;
; | J j
; 1 !
i 1
\
1 !
1 !
1
i
j 1
40
i :
''JiiL'i', -'S.t'-'. "'."''
-'-'.' ".;;'
-*-.ซป-. ^ ^JPOC
; : ' : J : 1
' ' ' ' ' \ ' 1 ' ' ' ''
''']'. ' ! t 1 i '
i : ! ! I i ! ;
i i : . i i
1 1 i I '
: i i ! ! i
i ' ' i 1 i i !
1 ! ; ' '. ' . I
! ; i '
! ' i * '
i 1 i ! ' i ! <
i i : : ; : .
; ' . i i :
1 - . i .
; : ' ! ; 1 - j i | - .
! ' ' - ' i .
-^
~
-4 t 4 -r *- ; i / iO'feO
i : ' i i ! i- !
i ! 1 ' - :
' ! i i ; ' ! :
' I i j
1 i ' i ! :
\
'. ' ' .
'' ' ! 1
.C-.w. V<-fcJC*i*ji^lป-*- . XJ-iX
L *-
~.:u
i i ' r
U
i
"/"
'
1 ' '
55of ': "...; ฃ9/^
;':-r ^_"r-5.
-------
CC1
J
[
ESTIMATE/JOS WO. -*
HOC20TIAI
11610
GC11-10
V /
Ez-
FIHED
ป ซ. ป
CAPACITY
WEIGHT
DESIGN: OF. PSIG
SHELL: OIACETEB
LENGTH T TO T
THICHJE5S
PL SPEC
HEADS: NO.. TYPE
THICMJESS
SUB TOTAL - 2501
SLABS & PEDESTALS
SADDLES FOB H83IZ. TKS.
COOC. TANK BIC5J
SUPPT. SUPERSTQWTUaEf
PUTFOnOS S LAOBEM
FlREWBflFiaR: TIFl.
Ttffl
mSULATlOB: TYPE. Ttttt
COVED
PtlflTldG-JinUCT
PAINTinfi-TAHK
. STL.
wmmm
vm
g^l
CC2-0
4\l
?
4
O
D WAIT IS Oft DAI IL $>[rHฃfcll
CODE-e
7
2
0
5
AREA-c=
0 1
^j
10
r
ITED OESCaiPTIW
17-22
2 5
0
1
#
#
ฃ
/V
r
23-48
,
5 1
$
p
R
ฃ
^t
/ ^
a
UK oiscaipnoa
17-22
1
1
1
1
2
2
2
2
1
i
/ 0
i i
7 3
9 0
9 0
1 0
I 0
I 0
3 0
3 0
b
5
6
1
3
1
1
1
1
1
- 1 I
A
B
B
B
B
B
B
B
B
9
B
*
A
B
C
D
t
F
6
9
A
*
*
O8!532ฃ2222222222222222%2
TOTAL
CODE: 2500
3QITE IN
23-30
f?
C
<3
^
^
&
i
P
i.
uJ
c
-<
^
p&
^
0
k
^
f^
/
j /
^>v
X)
/
7~
A*
'
'
pฃ
-V
^
/
"
T ^
(^
(^
f
0
M
ti
0 ^
m
KWfa
r f
-g-
' ^
\
$
V
' <
O
>
/
O
P
Q
q
C
i
i
* i i
Bffl*ปป9'5K<;--
|Sfa jjJjjJJJSS^b ftfe ^QOJjJjMbA - tf
^mSXSSSffiL
fa
' \2 I V0
s
40
"
ym.
SUDCOtlTRAGT
S4-00
^
^%
ft
Ml
ซ
if
3
^
v
^*
p;
;
M
>
v
.
- <
T
ซ
^
^
i
O
MB
ป
2งf2%2
mio.
o
#
o
CC75
J
C
t
(?(
k
k
LABOR
00-74
jL
ซ
^
te
^
e
<^
c
^
/
5
ซ
^
^
7
MM
C
Mซ
0
^
Q
o
ป
(9
iv
Q
DEJISaATKin: TANKAGE _ SHEET / OF /
TTTTT
-------
CC1
EM lift ATE O&TAI
ESTIMATE/JOB
SEQUENTIAL
PIECE*
*
NO. -ป
CC11-16
FIXED
B. .. ..
BARE PIPE: CARBON
STL
ALLOY
OTHER HATLS.
VALVES: CARBON STL.
ALLOY
OTHER HATLS.
FLGS, FTGS: CARBON STEEL
ALLOY
OTHER
MATLS.
SPECIALTIES-TRAPS,
ETC.
SPRING HANGERS
EXPANSION JOINTS
SHOP FAB'N. - VDR
CARB.
STL
ALLOY -
ERECT. UNDERGROUND PIPE
K/H TON
ERECT. RACK PIPE:
M.H-'TON
ERECT. RACK PIPE
g^gg
y u /rnu
ป___J|jJLjLiijl
CARB
. STL
ALLOY
TQ1M
$
^
CODS: 1300
CC2-6
4
1
Q
4
ฃ
CODE-*
7
1
0
3
1
III SHEET
AREA-* <
9 1
3J
0
?
ITEE3 DESCRIPTION
17-22
1 3
0
1
#
n
23-45
LINE DESCRIPTION
17-22
1
1 ,
1
1
1
3 0
1 0
i U
] 0
3 0
2
3
4
5
6
A
B
C
D
E
F
G
A
B
C
D
E
F
G
A
B
C
D
E
F
G
H
1
J
A
B
A
B
A
B
C
D
*
*
*
*
*
*
*,
*
*
*
*
*
*
*
*
if
*
*
*
*
*
*
^^^^^^^^
WRITE IN
23-38
^
ฃ%
%
h
\
%
i
i
I
I
r/4
ft
V,
y>
%
$
^
fa
%
%
to
&
%
'4
%
FIXED
TYPE
UNIT
TON
TON
TON
TON
TON
TON
TON
NO
NO
NO
NO
NO
NO
NO
UNR
UNR
UNR
UNR
UNR
UNR
UNR
UNR
UNR
NO
TON
TON
TON
TON
m
TON
m
Wd
WM
DESI6HATION: PIPING
QUANTITY
39-45
B
^
b
%
/
'M
$
I
%
%
*
r
A'
i
^
$
DATE
48-74
^
^
' 7
MATERIAL
54-60
^
^
^
^
^
4
2
^
^
^
^
I
1
$
'
S
&
0
0
0
%
$
Q
O
-
v>
0
r<
s
46
-
^^
^
g
i
^
%
SUBCONTRACT
54-60
i
I ;
#
i
'
%
rri
%
K
CC75-80
i
*
t
i
i
LABOR
60-74
z2&ฃ
f!s
^
1
^
X4
^ SHEET OF >f
.\Z.l.\i
-------
CC1
ESTIMATE/JOB NO. -eป
SEQUENTIAL
PIECE*
CC11-18
FIXED
* ,.
ERECT. ALL OTHER:
CARB. STL
dH/TON
ERECT ALL OTHER
: ALLOY
BH/TON
FLO. SHOP FAB: CARB.
STL
BH/TON
FLO SHOP FAB: ALLOY
HH/TON
TESTING WELDERS
PIPING SKETCHES
TEOP. PIPING
PIPE CASTINGS
EXCAV. FOR UGRD
. PIPING
COAT & WRAP UNDGRD.
PIPING
SUB TOTAL - 1300
CONC.P.S. 100*
FLO.
FAB.
INC. FDN.
PIPE BAY TRENCHES
PRECAST P.S. -
PRECAST P.S. -
FAB'N. ONLY
ERECT. OSLY
PIPE SUPPT. RIGRID HGRS.
MINOR P.S. - PREFAB
SMALL SHAPES -
FLO.
FAB.
PIPE RACKS - PREFAB
FIREPROOF. STR.
STL.
P.S.
PIPING INSULATION
PAINTING STR. STL
SUPPTS.
PAINTING PIPE
TESTING
ii^oomAuib ufeiAi
CC2-6
4
^
4-
0
CODE-o
7
1
1
3
\
L frlHIfefcl
AREA-*
0 1
*C{
0
^
ITEtl DESCRIPTION
17-22
1
3 0
7
*
ซ
23-45
LINE DESCRIPTION
17-22
1
1
1
1
1
2
2
2
2
3 0
3 0
3 1
3 3
3 4
3 4
7 1
7 1
7 3
7 3
B 0
B 0
B 0
B 0
9 0
2 0
3 0
3 0
4 0
8
9
0
9
0
1
3
0
1
2
5
5
5
7
1
1
1
1
1
A
B
C
D
E
F
G
H
9
A
A
A
A
A
B
C
A
A
A
A
B
A
9
*
*
*
*
*
*
*
*
*
*
*
*
*
VVVVVvVVVV^
TOTAL
CODE: 1300
WRITE IN
23-30
'//
%
ft
f
ft
*
o
\
ft
rr
fa
6
0
V
9
*
fa
ft
ป
/
ft
//
T
%<
ii
^
0
^
H
%
%
fa
#
%
fa
^FA
ft
W
%
i
i
FIXED
TYPE
UNIT
TON
UH
TON
m
TON
HH
TON
DH
%Pl
EA
SDL
LF
CY
LF
CY
CY
CY
NO .
LB
LB '
LB ,
LB
CF
LF
TON
TON
*PL
Hii
DESIGNATION: PIPING
QUANTITY
39-45
/
3
% yyf
t/ ^i
$
)
ft
ft
%
o
%
1
~~
o
f
d
W
'H
^
^
%\
4
DATE
48-74
'MM
%
W
W
MATERIAL
54-60
"
fa
*
~
ty
ty
?
*
ซ
i
2
W
lU
/
3
3
#
7
ป
c
C
C
ty<
o
0
o
o
rr
c
S
40
^
war,
SUBCONTRACT
54-00
%
%
msm
-
^
^
ty>
|yl
pn*
^
^
CC75-00
L
i
\
i
LABOR
66-74
i
^
^
f
i^j
r
^
i
2,
/
2.
$
7
%
ฃ
C
0
o
o
ft
^
SHEET OF
-------
i
1 ("
CC1
)
ESTIMATE/JOB NO. -<
SEQUENTIAL
PIECE!
CC11
-18
FIXED
* -
INSTRUMENT BOARDS
BD-UTD. INSTR. -
ANALYSIS INSTR
ACCESS
. FLO
FLC* INSTR. FLO.
LEVEL iNSTR. FLO.
PRESSURE INSTR
. BTD.
HTO.
HID.
, FLO
TEHP. INSTR. FLO.
WEIGH INSTR. FLO.
. BTD.
BID
HTO.
COMBUSTION CONTROL
CONTROL VALVES
SLIDE CHOPPER
PLUS
- PKGD.
VA
VALVE POSITIONERS
BUTTERFLY VALVES
RELIEF VALVES
.A. FILTERS, REGS.
1
ACCESS.
.A. TUBING & FITTINGS
.A. SUPPLY
A. CHANNEL &
INSTR. PROCESS
SUPPTS.
PI
PING
INSTR. HOUSINGS
INSTALL. CALIBRATE.
ST-UP
INSTRUMENTATION SUBCT
SUB TOTAL - 1500
FTGS. & PIERS
CURBS i LEV. RAH
PIPING INSUL.
. PANEL
WINTERIZE
PAINTING - EQUIP
PAINTING - PIPE
'tfl/ffiMffitfffl
7T)
TOTA
&
L
(fj?
ft
W
CODE: 15,00
i^iiomAiit ufeu^
CC2-6
' 4J/I?
f
O
CODE -e>
7
1
8
5
\\
L ^HfcfcB
AREA-t
ITEM DESCRIPTION
17-22
1
5|0
i
it
*
23.45
ฃ
f-
>/
\
/
/v
S
r
Kl
) /
y<
ฃ
LINE DESCRIPTION
17-22
1
1
I
1
1
1
1
1
1
2
5
5
5
5
5
5
7
7
7
3
0
1
1
1
2
5
1
1
n
0
0
3
1
6
8
0
0
0
I)
1
1
1
A
B
A
B
C
D
E
F
G
A
B
C
D
E
A
B
C
D
A
B
A
A
9
A
R
A
A
B
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
g
W%/ffifflffiffifa
WRITE IN
23-38
^
k
(ft
W
m
M
%.
M
I
*//
W
%
%
*'/<
$
%
w
w
w
}fa
V
$
m
Vs
*
V
r
9 1
>O
0
IT*
/
FIXED
TYPE
UNIT
LF
NO
NU
NO
NU
NO
NO
NO
NO
NO
NO
NO
NO
NO
UNR
UNR
UNR
UNR
UNR
UNR
ฃMC
UNR
CT
CY
LF
TON
ION
^
wm
DESIGNATION: INSTRUMENTATION
\-
r /<
0
C
DATE
-74
Y/'
S
46
f
^
%%'',
w
%
%
/>
SUBCONTRACT
L 54-60
ซ
Vj
ซ
ซ
^^
^
Mk
. 4
- ซ
i^
^t
ft-
9
ซ
ป
/vj
^M
^M
^H>
r^
ซ
ซ
**
^
/^
CC75 SO
1 1
J
t.
\.
\.
LABOR
68-74
^
ป
ซ
^f
MD
!
^^
^
/
M
*
"> .
ti
f
/
fป
ft
^
/
0
C
"
;jv
of
SHEET OF
(
-------
CC1
ESTIMATE/JOB NO. -*
SEQUEMTIAL
PIECE*
CCii-il
I
FIXED
*. .. ..
MOTOR CONTROLS
POWER WIRING
LIGHTING SYSTEM
GROWING SYSTEM
TE
LEPHGNE i CCHiiUN.
SYS
ELECTRIC TRACING
SUBSTATICNS
IKSTR'MXT W!3
!HG
GEHL. ELECTRICAL
EL
XATL.
EC. SUBCONTRACTS
TE*?. P i L MAT IS
cccc.
fcblliVlAlfc DtT/
CC2-3 j
41 ! ^14
0
CODE-*
7! ซ
1 -S
i ง s S M 1" I*
*&!ฃป *J i 1 a. L.
AREA-<
ITEM DESCR1PTIOK
17-22
1 '
j Djlj*
#
23-45
I i
LINE DESCRIPTIOH
17-22
1 ฃ
1 ฃ
1 ฃ
) 0
,
2
0 5
i
>JC
7
1 ;6!u'8
; 60 9
ilen
POHER BILLS
TEMP. P & L SUBCOST.
SUB TOTAL - 1603
4|
r!
SC. ELECT. SL'PPT.
FTGS
DUCT EMJISENEHTS
ELECT. MANHOLES
STRUCT. STL. FOR
SUPPTS.
PAIHYItiG - STP'.'CT.
P.!!KT|86 - EtU
IP
STL.
PAINTING - CONDUIT
t
^r.rr,
r"":
""""TSTAL
"%&$.
%
3*
1
i ...
f 1
t
1 ]
3
110
1 712
1 1
u
2i 3
2 3
-f
0
!2 3
lo i
'Oil
0 1
0
1
A
A
B
*
*
*
C*
0
E
A
B
C
*
*
*
*
*
A *
A
*
"P *
B
*
A *
B
C
3
A
A
A
n
U
c
...
tffflffl'/'ffify.
*
if
9
*
*
^i
*
*
*
*
WRITE IN
23-38
I
1
j i
j
i
i
,'''>
! i
i
i
i
j :
t
1
! t
5 t
i
j
1
i i
; ' !
i
i
!
i
1
!
i
i '
1
t <
--
i ;
....'.. ..!.
alt
ป<
i
FIXED
TYPE
UNIT
HP
UNR
UNR
UNR
UNR
UNR
KVA
RVA
KVA
UNR
UNR
MR
UhR
UNR
UNR
UNR
CY
CY
CY
LB
TON
TCN
TON
1
2JJ
C
*
T"
QUANTITY
39-45
-'
I
i
| i
I
"^ 1 !
< i
j
t i
r~
1
i !
i
1
1
n
'/A
i
1
1
i '.
. i :
'%
^,
1
v;
'r'
I
.
DATE
48-74
Hi
m
*
%
WA
MATERIAL
54-60
M--*-J- !
i - 5 di&o
f-r.:-*-H
!
i
i
2
O
0
[ii
1 i 1 '
*
i
i
: i . !
l
l
i
i
|
i '
,
!
1 ; . ; i !
; i
:
i
l
i , J
i
i
j
i
/
Q
o
! ! '! i
! \ !
1 ' ;
t
1
\
'
i !
-r
I
..'-
/
o
0
i
: . i
,^ , .
.4&
....
^
"|[.
qoi
mm
s
46
''2&&
-i
m
SUBCONTRACT
54-60
i
i
1 j
i i I
i j
i i
CC75-8C
; i ' : i
A
LABOR
S8-74
- ^^ 1 H
1 : 4*K6O
!r* i-4
: 'i i
-------
j-
_ USTOMER
LOCATION
CODE
- oioo
0200
0400
~ 0500
0600
0700
- 0800
0900
1000
- 1100
1200
2500
; 2800
\ 2900
j 3003
1 3100
'" 1200
;
._ 1300
uon
^ 1500
i 1600
1700
; IBOO
1900
5 - 2000
' 2100
2200
-2309
, 2400
2600
1 2700
| 3300
1 3500
J 3700
iBOO
- 00
"T300
go IBOO
2066
2100
r
SUB-SUMM
gti\)iฃoiJMtMTAL PrtoretTio/U /U
") 0 LA \ tTL\ f AD 1A
1 /Li i\rTfi Vn a /A/Of\ I H C^/t i\L/ ป- / N^rr
7
DESCRIPTION
FIRED HEATERS AND BOILERS
STACKS
REACTORS AND INTERNALS
TOWERS AND INTERNALS
HEAT EXCHANGE EQUIPMENT
COOLING TOWERS
VESSELS. TANKS. DRUMS ft INTERNALS
PUMPS AND DRIVERS
BLOWERS AND COMPRESSORS
ELEVATORS. CONVEYORS. MATERIALS HANDLING EQUIP.
MISCELLANEOUS MECHANICAL EQUIPMENT
TANKAGE
FILTERS. CENTRIFUGES. SEP. EQUIPMENT
AGITATORS AND MIXERS
w SCRUBBERS & ENTRAINMENT SEPARATORS
MACHINE TOOLS & MACHINE SHOP EQUIPMENT
HEATING. VENTILATION. AIR CONDITIONING.
OUST CONTROL (Process only)
PACHAS UN!TS
SUB-TOTAL - MAJOR EQUIPMENT
PIPING
SEW:RS
INSTRUMENTATION
ELECTRICAL
CONCRCTl /30 CV
STRUCTURAL STEEL
FIREPROOF ING
BUILDINGS
SITE DEVELOPMENT
INSULATION
PAINTING I PROTECTIVE COATINGS
FIELD TESTING
CHEMICALS AND CATALYST
PILING
FIRE PROTECTION
MISCELLANEOUS FURNITURE FOR PLANT BUILDINGS
SUB-TOTAL
MISCELLANEOUS DIRECT CHARGES
STOREHOUSE ACCOUNTS
CONSTRUCTION SUPPLIES I PETTY TOOLS
TESTING WELDERS
TEMPORARY PIPING ft ELECTR CAL FACILITIES
TEMPORARY CONSTRUCT ON BU .0 NGS
TEMPORARY SITE OEVE .APMENT
OTAL DIRECT COSTS
A R Y
MATERIAL
c.
'
277.000
3.9 'OO
' 300
3Q/&GO
MATE HO 4/7#C
IMTF
PlfiF
LABOR
.
/ ' S"^OOO
/3.000
/.Zoo
Jt?,30G
>^feK A/ML
-*'
nr
SUBCONTRACT
ซ,
;
i
-------
CC1
ESTIMATE/JOB NO. -n
SEQUENTIAL
PIECE #
ecn-to
FIXED
___ป .. ,.
HOI OR CONTROLS
POWER WIRING
LIGHTING SYSTEtl
GROUNDING SYSTEtl
TELEPHONE & COpUN.
SYS
ELECTRIC TRACING
SUBSTATIONS
INSTRUMENT HIRING
GENL. ELECTRICAL
BATL.
ELEC. SUBCONTRACTS
TEHP. P & L tUTLS
. CCCO.
PORER BILLS
TEBP. P & L SUBCONT.
SUB TOTAL - 1600
MISC. ELECT. SUPPT.
FT6S.
DUCT ENCASEBENTS
ELECT. HANHOLES
STRUCT. STL. FOR
SUPPTS.
PA I HT ING - STRUCT.
STL.
__PJINTING - EJUUP,
PI
1
.
i
1 CO
JINTING - CONDUIT
.. 7^
m :r[ii)
ปt
ESTIMATE OlฃTฃ
CC2-0
f
/
f\4-
o
CODE -ซs
i
i
t
6
1
V
il- SKIiET
AREA-!
lo 1
ฃj
0
iTEd BEseniPTOa
17-22
Jj
6 0
1
9
#
23-49
LINE DESCRIPTION
17-22
1
-
1
1
1
1
1
1
1
1
1
2
7
2
1
6
6
6
6
6
6
7
7
7
8
3
3
3
0
0
0
0
0
1
1
2
2
0
0
0
0
2
5
7
B
9
0
0
0
9
1
1
1
I
!
A
A
B
C
0
E
A
i
C
A
A
A
B
A
B
C
9
9
C
NA
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
9
%
WRITE IB
23-30
....
\.
-
.....
1
* H
, i
t
!
j
!
.....
1 ' -
V,
V
^
^
%
Vd
i
&
K
^
^
%
m't.
ปj
V
w4
i;
FIXED
TYPE
UNIT
HP
UNR
UNR
UNR
UNR
UHR
KVA
KVA
KVA
UNR
UHR
UNR
UNR
UNR
DflR
UNR
CY
CY
CY
LB
TON
TON
TON
^
QUANTITY
30-49
%
/
g
il^
TIOW: ELECTRICAi
^
^
^
0
%
%
i
! j
.
^
&
c
%
%
y
DATE
48-74
Ifj^fgggl^f^lgf^
BATERIAL
54-60
^
i
^7
I
0
0
ซ!
j
1
|
fa
3
^
L7
3
0
c
i
.,
fy/t
0/0
^
iQ
0
*
r>
0
*
^
o
s
46
w<
wSxjJM
SUBCOdTRACT
54-60
V
^N|
I^HB
i
6
-C
-t
mtm
-
^
^
I
i
t
w>
r
*M
ซ. 1
mm-M
I^H
!
Bsios
>h
%'
m*
CC7500
i
ft
L
i
L
LADOR
00-74
/
/
$
ri
3,
1
W<
ฃ\9
o
0
I
9
0
d
o
0
O
i
ij_
^Kfe
ฃiOO
SHEET OF
-------
BIBLIOGRAPHIC DATA ' RcPฐrt No- - 2'
SHEET EPA-R2-73-148b
4. Title and Subtitle
A Process Cost Estimate for Limestone Slurry Scrubbing
of Flue Gas . Part H -- Detailed Estimate Sheets
7. Author(s)
E.L. Calvin
9. Performing Organization Name and Address
Catalytic, Inc.
1515 Mockingbird Lane
Charlotte , North Carolina 28209
12. Sponsoring Organization Name and Address
EPA, Office of Research and Monitoring
NERC/RTP, Control Systems Laboratory
Research Triangle Park, North Carolina 27711
3. Recipient's Accession No.
5. Report Date
Januarv 1973
6.
8. Performing Organization Rept.
No.
10. Project/Task/Work Unit No.
Task No. 11
11. Contract/Grant No.
68-02-0241
13. Type of Report & Period
Covered
Final
14.
IS. Supplementary Notes
16. Abstracts
JC~ AX V O.J. WJL CliV^ A vฃ/w* ^ vvx.iA^M_A4Ai_* MvซrM.A^v-ปvv,...-inr.v _ ^
design and cost estimate for a wet limestone scrubbing system for removal of sulfur
dioxide from the flue gas of a new 500-megawatt steam boiler plant, fired with coal
containing a 3. 5 percent sulfur. The estimate covers all equipment from the boiler
breeching to the stack, and includes: limestone storage and processing, slurry
scrubbing with stack gas reheater and accessories, and spent limestone slurry pond
disposal and water recovery. The capital cost for the scrubbing system installed
with a new boiler plant was estimated to be $20.15 million, or an incremental cost
of $40. 30 per kilowatt of installed power. The operating cost was estimated to be
$7.20 million per year, or 2.06 mills per kilowatt hour of electricity generated.
17. Key Words and Document Analysis.
Air Pollution
*Desulfurization
Flue Gases
Washing
*Cost Estimates
Capital Costs
Operating Costs
Design
Limestone
17b. Identifiers/Open-Ended Terms
Air Pollution Control
Stationary Sources
*Wet Limestone Scrubbing
17o. Descriptors
Slurries
Sulfur Dioxide
Coal
Equipment
17c- COSATI Field/Group
13B
18. Availability Statement
Unlimited
19. Security Class (This
Report)
UNCLASSIFIED
20. Security Class (This
Page
UNCLASSIFIED
21. No. of Pages
96
22. Price
FORM NTIS-3S IREV. 1-721
USCOMM-OC I4952-P72
-------
INSTRUCTIONS FOR COMPLETING FORM NTIS-35 (10-70) (Bibliographic Data Sheet based on COSATI
Guidelines to Format Standards for Scientific and Technical Reports Prepared by or for the Federal Government,
PB-180 600).
1. Report Number. Each individually bound report shall carry a unique alphanumeric designation selected by the performing
organization or provided by the sponsoring organization. Use uppercase letters and Arabic numerals only. Examples
FASEB-NS-87 and FAA-RD-68-09. ซ
2. Leave blank.
3. Recipient's Accession Number. . Reserved for use by each report recipient.
4. Title and Subtitle. Title should indicate clearly and briefly the subject coverage of the report, and be displayed promi-
nently. Set subtitle, if used, in smaller type or otherwise subordinate it to main title. When a report is prepared in more
than one volume, repeat the primary title, add volume number and include subtitle for the specific volume.
5. Report Dote. Fach report shall carry a date indicating at least month and year. Indicate the basis on which it was selected
(e.g., date of issue, date of approval, date of preparation.
6. Performing Organ! zotion Code. Leave blank.
7. Authors). Give name(s) in conventional order (e.g., John R. Doe, or J.Robert Doe). List author's affiliation if it differs
from the performing organization.
8. Performing Organization Report Number. Insert if performing organization wishes to assign this number.
9. Performing Organization Name and Address. Give name, street, city, state, and zip code. List no more than two levels of
an organizational hierarchy. Display the name of the organization exactly as it should appear in Government indexes such
as USCRDR-I.
10. Project/Task/Work Unit Number. Use the project, task and work unit numbers under which the report was prepared.
11. Contract/Grant Number. Insert contract or grant number under which report was prepared.
12. Sponsoring Agency Name and Address. Include zip code.
13. Type of Report and Period Covered. Indicate interim, final, etc., and, if applicable, dates covered.
14. Sponsoring Agency Code. Leave blank.
15. Supplementary Notes. Enter information not included elsewhere but useful, such as: Prepared in cooperation with . . .
Translation of ... Presented at conference of ... To be published in ... Supersedes . . . Supplements
16. Abstract. Include a brief (200 words or less) factual summary of the most significant information contained in the report.
If the report contains a significant bibliography or literature survey, mention it here.
17. Key Words and Document Analysis, (a). Descriptors. Select from the Thesaurus of Engineering and Scientific Terms the
proper authorized terms that identify the major concept of the research and are sufficiently specific and precise to be used
as index entries for cataloging.
(b). Identifiers and Open-Ended Terms. Use identifiers for project names, code names, equipment designators, etc. Use
open-ended terms written in descriptor form for those subjects for which no descriptor exists.
(c). COSATI Field/Group. Field and Group assignments are to be taken from the 1965 COSATI Subject Category List.
Since the majority of documents are multidisciplinary in nature, the primary Field/Group assignment(s) will be the specific
discipline, area of human endeavor, or type of physical object. The applications) will be cross-referenced with secondary
Field/Group assignments that will follow the primary posting(s).
18. Distribution Statement. Denote releasability to the public or limitation for reasons other than security for example "Re-
lease unlimited". Cite any availability to the public, with address and price.
19 & 20. Security Classification. Do not submit classified reports to the National Technical
21. Number of Pages. Insert the total number of pages, including this one and unnumbered pages, but excluding distribution
list, if any.
22. Price. Insert the price set by the National Technical Information Service or the Government Printing Office, if known.
FORM NTI3-33 IREV. 3-72) USCOMM-DC 1ซซS2-P72
------- | |