• THESE DATA ARE OBTAINED FROM THE GRANTS INFORMATION AND CONTROL SYSTEM (GICS), MONTHLY
REGIONAL REPORTS OF GRANT ACTIVITY AND OTHER SOURCES.
0 AVAILABLE FUNDS ARE BASED UPON ADVICES OF ALLOWANCE (AND SUBALLOCATIONS) ISSUED; THE
BALANCES HAVE NOT BEEN REDUCED TO REFLECT PROJECTS RECOMMENDED FOR FUNDING (COMMIT
MENTS) BUT NOT YET AWARDED.
• PROJECTED ANNUAL FUNDING DATA ARE BEST AVAILABLE ESTIMATES AT THE TIME OF PUBLICATION.
• MONTHLY AWARDS FIGURES ARE PRELIMINARY AND SUBJECT TO ADJUSTMENTS.
• A CONSOLIDATED GRANT IS ONE FUNDED UNDER MORE THAN ONE
GRANT AUTHORITY BY THE ENVIRONMENTAL PROTECTION AGENCY.
9 DETAILED INFORMATION ON OBLIGATIONS AND PAYMENTS MAY BE OBTAINED FROM THE AGENCY'S
OFFICIAL ACCOUNTING RECORDS UPON REQUEST TO THE FINANCIAL MANAGEMENT DIVISION.
PREPARED BY
GRANTS ADMINISTRATION DIVISION
PHONE: AREA CODE 202 755-2513
-------
TABLE OF CONTENTS
ALL GRANT PROGRAMS PAGE
Recent Highlights 1
Number of Active Projects 2
Monthly Award Summaries FY 1974-75 T 3,4
First Nine Months Grant Awards 5
WASTEWATER TREATMENT WORKS (WWT) CONSTRUCTION
Distribution of Construction Grant New Project Awards for March 6
March Application Processing Activity 7
Obligations and Expenditure by FY 8
Application Processing in Regional Offices 9
Active Projects Under PL 84-600 10
PL 92-500 WWT Construction
Monthly Awards and Decreases-Cumulative " 11
Status of FY 1973-75 Allotments by Region : 12
Status of FY 1974-75 Allotments by State 13
Status of FY 1973-75 Allotments by State 14
New Projects Funded Under PL 92-500 Distribution by Step 15
Active Projects Under PL 92-500
Number 16
Dollars 17
Cumulative 18
Summarized By Census Population Groupings 19
Increases to PL 84-600 Projects Using PL 92-500 Contract Authority Funds 20
Status of Construction Allotments and Projected FY 75 Project Funding 21
OTHER STATE AND LOCAL ASSISTANCE PROGRAMS
WPC State and Interstate Program
March Application Processing Activity 22
Plans Funded - Amount by Recipient 23
Air Pollution Control Program
March Application Processing Activity 24
Distribution of Awards by State 25
HEADQUARTERS AjDMINlSTERED PROGRAMS
Distribution of Headquarters Grant Awards By Type of Action 26
Geographic Distribution of Active Grants by
Region, State and Program 27
Research and Demonstration
Numbers 28
Dollars ~r 29
Training and Fellowships
March Application Processing Activity
Dollars 30
-------
RECENT GRANT HIGHLIGHTS
GRANT AHARD DOLLARS FOR THE MONTH DOUBLE
$301.5 Million in grant applications (486) were approved in March compared to
$146.8 Million in grant applications (460) in February. State and local assistance
including construction grants accounted for 406 or 84% total EPA grants awarded in
the month of March. FY 75 Construction awards of $1.68 Billion already exceed all
of FY 74.
RESEARCH AWARDS TO EDUCATIONAL INSTITUTIONS TOTAL $9.9 MILLION
222 research awards totaling $9,9 Million were made to educational institutions
during July through March of FY 75. Of these awards, 13 totaling $442 Thousand were
made to minority educational institutions.
$2 BILLION OF WHT CONSTRUCTION GRANTS FY 1974 CONTRACT AUTHORITY
OBLIGATED - $1 BILLION REMAINS AVAILABLE FOR OBLIGATION
$2 Billion of WWT Construction grants FY 1974 Contract Authority funds have been
obligated to date, $1 Billion remains available for obligation prior to reallotment
on July 1, 1975. Thirty one states have obligated over 90% of their FY 74 allotment.
(See page 13).
-------
\
NUMBER OF ACTIVE PROJECTS
. MARCH 31, 1975
There are 1,559 more State & Local Assistance active projects as of March '31, 1975
than there were as of the same month of 1974.
\
Region
I
II
III
IV
V
VI
VII
VIII
IX
X
Total 3/31/75
Total 3/31/74
Headquarters
Research
Demonstration
Training
Fellowship
Total
Total
264
387
607
1,102
1,070
788
464
401
354
333
5,770
4,211
(%)
4
7
11
19
18
14
8
7
6
6
100
-
Training
3 '
7
5
6
9
6
1
3
4
5
49
16
Consolidated
Program Grant
(1)
(1)
0
0
(2)
0
(1)
(0)
(2)
(4)
(11)
(9)
NO. %
403 49
129 16
147 18
139 17
818 100
Solid
Waste
Planning
2
4
4
5
31
0
12
4
4
4
70
84
Air
Pollution
Control
6
18
15
27
48
12
15
7
22
6
176
.205
WPC
State and
Interstate
7
5
9
8
7
5
4
6
7
4
62
60
WPC
Areawi de
Planning
0
0
4
3
4
0
0
2
1
0
14
-
I/
-
WPC
Wastewater
Construction Other I/
237
350
565
1 ,040
950
761
427
371
312
305
5,318
3,802
9
3
5
13
21
4
5
8
4
9
81
44
Includes the Following:
Pesticides
Manpower
Grant Lakes
Solid Waste
Accident & Safety
Development
Pollution Control
Demonstration
WPC Basin Planning.
-------
\
RE G I 0 N A L GRANT AWARD A C TI 0 N S
($ IN THOUSANDS)
APC SWM AREAWIDE WASTE WPC STATE WWT WORKS 21 CONSOLIDATED
CONTROL PLANNING TREAT PLNG & INTERSTATE CONSTRUCTION TRAINING AWARDS OTHER i'
NO. S NO- 5 NO. $ NO. $ NO. S NO. S NO. S NO. S
J1JL 73
AUG 2 2,007
SEP 10 2,610
OCT 7 532
NOV 9 2,569
DEC 8 918
JAN 74 20 2,760
FEB 27 3,812
MAR 8 1,657
APR 32 4,295
MAY 1=. 1.435
JUN 92 22,658
FV 7* 230 45,253
JUL 9 1,775
AUG 4 2 ,558
SEP 8 2,530
OCT 6 2,721
NOV e 2,386
DEC 14 1,112
JAN 18 2,786
FEB 25 2,460
MAR 26 3,509
APR
MAY
JUN
TO DATE US 21-637
-
-
_
f
-
26
27
-
-
-
-
5 350
5 403
5 174
5 297
3 67
3 144
3 176
2 71
50
1 80
2 77
24 1,136
-
-
-
-
-
-
-
-
-
1 948
-
10 12,257
11 13,205
-
-
-
-
1 495
1 650
-
1 1 ,250
-
3 2,395
:
6 1,253
8 1,660
1 8 3 ,646
21 9,684
9 4,516
15 8,203
13 6,675
4 2,109
3 1 ,878
6 711
45 2,846
153 13,186
13 7,645
25 21,251
12 2,847
3 4,028
5 2,532
7 675
11 1,685
16 2,386
15 1,875
107 44,924
182 129,482
70 11,054
31 11,578
46 15,118
69 9,225
75 39,679
70 28,443
110 44,871
162 72,146
161 48,149
300 186,808
601 387,664
1,877 1,484,217
166 81,509
219 169,149
260 194,050
274 205,722
254 143,644
241 134,858
300 219,089
363 138,182
358 291,802
2,435 1,578,005
-
-
-
-
-
-
-
3 51
4 80
1 19
6 88
21 369
35 6Q7
-
-
1 4
1 10
-
1 5
4
2 45
1 11
6 79
-
2 (450)
3 (1,375)
2 (581)
3 (2,010)
4 (1,HZ)
4 (1,802)
2 (1,675)
2 (104)
1 (700)
3 (354)
7 (3,355)
33 (13,548)
1 (2,204).
6 (5,934)
.
4 (2,908)
2 (395)
-
6 (1,027)
2 (329)
3 (93)
24 (12,890)
-
-
-
-
-
-
-
-
-
-
2 650
31 4,775
33 5,425
-
5 473
3 198
1 64
9 267
6 185
1 39
.1 106
1 23
27 1,355
]_/ Includes Increases
27 Goes not include reimbursements urnter PL 93-207
3/ Includes Research and Demonstration (Regional), Pesticides and
Great Lakes Multifunctional.awards.
-------
HEADQUARTERS GRANT AWARD ACTIONS
( $ IN THOUSANDS )
RESEARCH
DEMONSTRATION
TRAINING
FELLOWSHIPS
NO.
s
NO.
$
NO.
NO.
. JUL 73
AUG
SEP
OCT
NOV
DEC
JAN
FEB
MAR
APR
MAY
JUN
FY 74
JUL
AUG
SEP
OCT
NOV
DEC
JAN
FEB
MAR
APR
MAY
JUN
FY 75
TO DATE
1
7
9
29
46
16
33
36
33
43
60
113
426
-
16
24
34
19
37
35
33
57
255
40
405
526
1,249
1,874
776
1,358
1,399
1 ,496
2,067
2,820
5,057
19,067
-
773
722
1,553
489
1,952
1 ,681
1,487
3,058
11,715
_
-
7
1
11
2
13
6
8
6
3
38
95 '
-
-
5
4
-
7
6
7
7
36
_
-
659
52
740
128
957
432
927
377
331
4,141
85744
-
-
700
384
-
1,322
651
368
563
3,988
8
28
10
26
15
3
10
7
17
24
19
42
209
-
32
-
6
2
2
6
3
10
61
95
1 ,069
374
559
456
41
135
133
659
1,017
672
1,540
6,750
-
1,510
-
217
13
fi9
155
119
344
2,427
_
5
28
10
-
1
10
1
2
4
4
98
163
-
20
9
4
-
8
15
6
6
68
_
20
167 ,
62
-
3
32
6
10
28
21
481
830
-
105
50
9
-
35
32
21
27
]
279 |
i
V Includes Increases
-------
1,997.379
30
L
5 .
0
FIRST NINE MONTHS GRANT AWARDS
FISCAL YEARS 1973, 1974 & 1975
I ($ IN MILLIONS]
i
RESEARCH DEMONSTRATION TRAINING
FELLOWSHIPS ARC CONTROL SWM PLANNING
WPC-STATE
& INTERSTATE
WWT-WORKS
CONSTRUCTION
FY 1973
FY 1974
FY 1975
-------
DISTRIBUTION OF WWT CONSTRUCTION GRANT NEW PROJECT AWARDS BY STEP
FOR MARCS 1974 & 1975
($ IN 000's)
Step I projects acaounted for 73% of the new awards and 10% of the atiard dollars
made during March of 1975, as compared to 77% of the awards and 6% of the grant dollars
made to projects in this step during the same month in 1974.
STEP I STEP II STEP III
Mar
REGION NO.."
I
II
III
IV 11
V
VI 57
VII 8
VIII 8
IX
X 4
TOTAL 88
%OF TOTAL 77%
NEW AWARDS
. 74 Mar. ?5
$ : NO. - $
3
4
9
526 60
41
1,897 7
51 6
425 32
4
860 8
3, 759 175
AW fytOf
V /a / Q n>
106
12 f 428
598
2,698
1,225
146
215
1,279
354
291
19,366
11%
Mar. 74 Mar. 75
SO. $ NO. $
2.
_
- - 6
I 1,253 4
2
3 2,372 I
4 93 8
2
I
-
8 3,718 26
7% 6% 11%
204
-
980
488
615
15
178
276
503
-
3,259
2%
Mar. 74
NO. $
3
-
-
I
-
-
5
4
5
I
19
16% .
5,233
-
-
955
-
-
7,866
6,488
37,348
III
58,031
88%
Mar. 75
NO. $
6
-
4
9
6
2
5
3
3
3
40
17%
24,612
-
3,631
36,177
32,152
49, 872
8,401
3,199
4,797
1,888
162,263
88\
-------
WASTEWATER TREATMENT CONSTRUCTION GRANTS ACTIVITY
MARCH 1975
The cumulative number of awards through the first nine months of FY 75 was 199% (1620) higher
and the cumulative dollars awarded 336% ($1.2 Billion) more than during the first nine months
of FY 74.
MILLIONS
$400
300
200
100
REGION I
II
III
IV
V
VI
VII
VIII
IX
X
DOLLARS APPLICATIONS RECEIVED
DOLLARS AWARDED
(DOES NOT INCLUDE PL 93-207 REIMBURSEMENTS)
APPLICATIONS
IN PROCESS
REMOVED FROM
PROCESSING
APPLICATIONS
IN PROCESS
3/1/75
NO.
28
33
119
189
169
106
193
51
65
24
$
65.8
117.2
182.6
83.0
185.6
66.3
72.4
12.3
127.1
36.8
RECEIVED
NO.
9
10
16
58
93
23
23
22
8 •
11
$
15.2
19.1
41.1
41.7
222.8
6.6
24.4
4.6
4.4
2.0
FUNDED
NO.
12
7
36
94
66
31
33
43
12
24
$
24.9
22.4
28.0
50.1
37.5
53.3
25.0
5.2
9.0
36.6
(INCL. REJECTIONS)
NO.
0
0
0
1
0
2
1
0
0
0
$
0
0
0
0
0
.2
0
0
0
0
ADJUSTMENTS 3/31/75
$
0
0
0 -
-.6
+ .2
-.2
0
0
0
0
NO.
25
36
99
152
196
96
182
30
61
n
$
56.1
113.9
195.7
74.0
371.1
19.2
71.8
11.7
122.5
2.2
TOTAL
977
$949.1
273 $381.9 358 $292.0
$.2
$-.6
888 $1,038.2
-------
WWT CONSTRUCTION GRANT FUNDS
OBLIGATIONS & EXPENDITURES
($ IN MILLIONS)
Fiscal
Year
57-66
67
68
69
70
71
72
73
74
75 As of
Net Obligations
Yearly
-
$131.1
191.1
200.7
424.5
1151.6
859.8
2988.6
2633.3
3-31-75 1786.4
-ft *jr/u Ul 1*1 I W ^ULilUIUlrlV*. \J
Net Obligations
Cumulative
$668.5
799.6
990.7
1191.4
1616.9
2767.5
3627.3
6615.9
9249.2
11035.6 I/
LJ i i vju i, i isi 10 ituvc; u^^n *_
Expenditures
Yearly
"
$84.5
122.1
134.5
176.4
478.4
413.4
684.4
' 1552.5
1189.7
/VJJ^I 1 VJt. U
Expenditures
Cumulative
$450.0
534.5
656.6
791.1
967.5
1445.9
1859.3
2543.7
4096.2
5285.9 2J
% of
Cumulative
Obligations
Expended
67.3
66.8
66.2
66.4
59.8
52.2
51.2
38.4
44.3
47.9
I/ Includes $1508.7 Obligated under PL 93-207
27 Includes $839.1 Expended under PL 93-207
8
-------
WWT CONSTRUCTION GRANT APPLICATION PROCESSING IN REGIONAL OFFICES ]_/
MARCH 31, 1975
($ in Thousands)
241 new projects ($184.9 Million) were approved during the month compared to 115 ($65.7 Million)
during the same period in FY 74.
Regi on
I
II
III
IV
V
VI
VII
VIII
IX
X
Total 3-31-75
Total 3-31-74
Increases
Approved
This Month
#
2
3
17
21
15
21
14
6
5
13
117
48
$
7
10,011
22,763
10,730
3,441
3,252
16,199
502
5,777
34,379
$107,061
$ 6,467
New Project Applications in Regional Offices
End of Month
This Month Last Month
#
25
36
98
152
195
82
144
29
61
11
833
507
$
56,143
113,872
198,659
73,995
371,107
17,851
51 ,645
11,440
122,468
2,236
$1,019,416
$ 707,075
#
23
32
100
152
170
79
152
44
59
11
822
461
$
60,810
110,370
173,416
45,237
191 ,304
62,731
57,220
1 1 ,036
118,089
2,384
$832,597
$641 ,631
New Projects
Approved
This Month
#
10
4
19
73
51
10
19
37
7
11
241
115
$
24,916
12,438
5,210
39,362
34,015
50,034
8,793
4,754
3,192
2,179
$184,893
$ 65,718
]_/ Does not include reimbursable data under PL 93-207.
-------
WWT CONSTRUCTION GRANT ACTIVE PROJECTS
UNDER PL 84-660
Region
MARCH 31, 1975
($ in Thousands)
The number of projects awaiting construction is 17 fewer ($21 Million) than one month ago
One hundred forty-two projects funded for $206 Million still have not gone under construction
more than 27 months after award.
Total
Active Projects
TOTALS
2,316 $4,388,364
Projects
Awaiting
Construction
142
$205,577
Projects
Under
Construction
I
II
III
IV
V
VI
VII
VIII
IX
X
#
117
218
300
477
489
238
156
100
157
64,
$
237,100
1,203,114
422,641
701 ,850
851,723
334,093
178,969
66,799
315,536
76,539
#
1
6
38
29
3
27
8
17
10
3
$
732
30,114
41,131
25,569
5,827
42,667
24,922
9,851
24,532
232
. #
116
212
262
448
486
211
148
83
147
61
$. ' -
236,368
. 1,173,000
381,510
676,281-
845,896
291,426
154,047
56,948
291 ,004
76,307
2,174
$4,182,787
10
-------
-Breakdown of VJWT Construction Grant Obligations Under P.L. 92-500 Contractual Authority I/
The average monthly net obligation amount for the first nine rronths is
$168 Million compared to $32 Million for the same period in FY 1974.
Total as of 6-30-74
July
August
September
October
November
December
January 1975
February
March
April
May
June
Total as of 3/31/75
New Awards
No.
1506
75
141
186
174
175
160
215
262
241
3135
Grant $
2,738,806,979
65,573,745
131,313,006
139,034,543
158,429,048
107,851,910
50,527,929
127,025,755
98,671,074
184,892,870
3,802,126,859
Increases
No.
437
68
68
67
77
73
69
66
80
93
098
Grant $
297,942,650
13,016,663
33,010,912
53,437,006
41,489,847
35,358,153
83,632,402
90,492,682
28,191,409
105,279,751
781,851,475
Decreases
No.
'105
11
14
12
21
19
9
24
23
26
264
Grant $
53,982,658
2,659,534
1,280,296
10,705,162
3,817,281
2,006,249
3,837,946
2,013,360
2,059,129
4,602,518
86,963,585
Withdrawals
No.
4
0
0
0
0
0
2
2
1
1
10
Grant $
7,285,050
0
0
0
0
0
631,500
813,000
105,000
22,500
8,857,050
Net Total
No .2/
1502
75
141
186
174
175
158
213
261
240
3125
Grant $
2,975,481,92"
75,930,874
163,044,170
181,766,387
196,101,614
141,203,814
129,690,885
214,692,077
124,698,354
285,547,603
4,488,157,699
I/ Preliminary Figures.
?/ Net total "No." Includes
New Awards Less Withdrawals.
1 1
-------
TOTALS
STATUS OF FY 73 - 75 REGIONAL ALLOTMENTS OF
WWT CONSTRUCTION GRANT FUNDS UNDER PL 92-500 CONTRACTUAL AUTHORITY I/
MARCH 31, 1975
($ in Millions)
16% ($718 Million) of the Cumulative Obligations Under PL 92-500 have been expended.
Region
I
II
III
IV
V .
VI
VII
VIII
IX
X
FY 73-76
Al "lotments
$1325.8
3575.7
2433.2
1910.7
4435.7
826.7
702.7
201.2
2131.4
456.9
Cumulative
Last
Month
$363.3
957.8
743.0
388.5
781.6
187.3
182.6
57.0
379.4
162.5
Awarded
This
Month
$388.2
980.0
770.3
438.5
816.4
240.6
207.3
62.3
385.9
198.6
% Cumulative
Last
Month
27
27
31
20
18
23
26
28
18
36
Awarded
This
Month
29
27
32
23
18
29
30
31
18
43
Cumulative
Last
Month
$90.0
105.1
73.9
27.4
149.2
37.1
28.4
12.0
53.4
64.5
Expenditures 2
This ~
Month
$96.5
113.2
87.8
33,5
162.1
43.5
32.9
14.6
64,5
69.5
$18000.0
$4203.0
$4488.1
!_/ Preliminary Figures.
2/ Expenditure data provided by The Division of Financial Management,
23
25
$641.0
$718.1
12
-------
STATUS
»«T
bHANT
]J
PAKT 1
UNOfcH PL Yt>buO
AS U-1 MAH. il,
REGION
01
HtUIUN
Oi
WtLjlUf*
Ou
xc.Ljlu'v
Ub
'(tCilLJi1-
Oo
«tL.JUr.
U /
L) '
HtL.lui'*
UO
HtUIUn
O4*
rttGIUfi
lu
MttilUN
NAl 1UN
1
STATt 1
I
1
1
lUTAuSl
CT 1
MA |
It 1
Nh I
H] I
VT 1
IUTA|_Sl
NJ 1
NY 1
Hk 1
VI 1
1U1«LSI
DC 1
L>C 1
ML) 1
PA i
VA 1
wv (
1UT ALi> I
AL i
F i, |
t,A 1
*v r I
«b i
NL i
SL I
IN i
1 Ul A^Jj |
U i
U i
M I |
Mi, |
LI" 1
"1 1
lur ALJJ i
At 1
LA |
. i, ^ i
L-i*. 1
1 , \
1 LJ 1 a L ,S i
1" 1
i\ ^ *
flU 1
I*O 1
| (J I A L i> '
Lu i
l"l | |
I-V 1
biJ i
Ul I
•» i i
1 Li [ A L Si
ti 1
LA i
Ull 1
nl 1
l'< V 4
r ( 1
S* 1
f ut AL,SI
A* 1
Hi i
U" I
«A 1
1 LJ 1 A L b 4
UU ALSt
.LU,
bu,
IU,
0,
till,
iil,
ifo.
i,
c 1 ,
!"*>
l7,
P / *
11,
"33,
1 LI ,
10n,
[*^,
1",
1 1,
i-l ,
14,
*u.
tihc!.
lh / ,
1 fj u ,
d.^.
OU,
173.
S«r ,
"1",
1 u ,
i?n ,
n.
1 ->>
^ J ,
l«c:.
i'J,
1 1 ,
"4 ,
1 \ ,
1 I'Oj
•,
"i
1 ,
f. ,
" ,
e>i.
u,
c:4u.
tL,
^ .
n ,
1 ,
3-M ,
o,
0,
r"b.
f?0,
feb.
3.uCiu,
llMtN
«3U.
;^o>
ob",
-il,
1<=U,
M»,
bib,
t>!*,
1,0 tl ,
o^b,
/Ji>,
u^v!
S'< / ,
ebl »
nio,
7"*";,
iyo.
IV 1 1
oub,
Of 1' ,
job.
rib*
<;« / <
Utl / ,
4n o ,
UUV,
•*b / ,
d\ 1.
tub.
ill" ,
0 Li 0 ,
ib"i
3[>u ,
t v ,
II«C' ,
lc>c:.
u/1 ,
t^f.
DIP ,
Ir1"!
Dl-^,
U^P,
"VBO,
«01 ,
buu ,
ltd",
OOu,
/b7.
u30.
b(?o(
olo.
"yu1*,
031 ,
13",
i<">,
11 Ou,
/So,
bi 1 ,
uod.
7io,
jfl / ,
UL,U,
(JUU
uuu
00 1,
UUU
uuu
uuu
uOu
ULlU
uuu
U II U
*J U kl
J U u
(.10 J
uO^
L.. D"
LHIL'
OUu
U(n,
L...II.
Ull I.
UUU
tiLJu
UIK>
JU"
ULl"
UUL'
V ^1 L
LJ 1,1 u
Ir'Ol'
1 "U
I, l'i i'
fOl-
LI IJ LI
'jUi
U L] II
U >..i '
L 1 1..,
,. 0 .,
O t» •/
Ulll.
u(/u
.1 LI k.
U It . •
"Lu,
UUu
1,1 n u
UUl/
•jii.j
umy
uOi)
^lOl,
U 11 U
0 tl J
UO u
U 0 V
uuu
UUu
UOu
UOj
uuu
UUu
OOU
uOu
UOu
r. V. 1
UBLI
86,
1 il
Idl,
a! ,
3,
" t".
a.
1 uf-.
10,
Ib,
1 0 ,
1^1
1 ',
),
(?U 1 ,
lu,
I1*,
bl ,
Ull.
on ,
bt?«
^b'V,
lil.
1 'j ,
•' ,
' u.
1 U" ,
/,
11,
-4,
J 1 ,
•*3,
4,
i ,
1 ,
d.
u ,
c!3.
i|
1 -^ ,
>),
0,
1 ,
1 / U ,
*>.
o,
cb' ,
io,
01 ,
ei, OIK,
9/«
uAriuMS x
ilO,iu-»
(J c?b , 0 U 0
9rf 7 , 0 U 0
bo 7 , 0 U 0
ob i , 0 u U
c?()b, 710
isio, 3ou
?MO, DUU
"tl.ubg
H u 0 • 0 u D
^b3, c'uu
Oeil , U"
u u •* . n u o
0 / L' , loO
14*), t>V3
^eil, 7o^
s<;&,bl 3
^l«,, C , U U L)
V ' 1 ( J /^
3 / 7 , Be^b
7rt"y , llll)
1 f b , u o •;
/Bfi, I'UU
ov ' , iun
nb 1 , nun
bn'1, 4 1 1
>f 1,4, lluu
One1, Jon
1 > u . 0 u C
1 o , b " u
b 3 3 , y / v
/bo, iiuu
530 ,4 /u
upe!, 0<;b
] pu , 1 «ij
">33, 1 uu
e?9b,,>ho
1
UOLibAIti; 1
1
t
4
1
60 I
70 1
10U 1
10U 1
10J 1
1
7) 1
^d 1
«b l
Id i
iu 1
1
b i
1 "* f
d } l
^0 1
in 1
1 Ju 1
i
"IV 1
i , ^ /^ ,
M , ^ U 4 .
/ J,e? /"<,
I ; , nlj,
jb / , *?j ,
d , 1 / d ,
-1 , lUu,
)o, o'o.
ll?") .
b/".
b3e, cfc?j.
1 b , u b ", ,
', o«o,
i", 1 So,
o it , / i u ,
1 £' 1 . 0 S u ,
4 , U 1- 0 < (1 0 U i
VOu
•!
10 j
L: 0 u
W L' U
O'JU
30u
/Ou
"bJ
1 i, u
4(1 J
/OU
b»-j
'Ou
u u u
^ . r , it /b"
1 /, BIO,^ 16
t , 1 jo, boo
•."iiiJtii.blb
" ujj, 4-.U
^4,^51 , n i b
i 0 i O £ ^ . O / (J
r-,f «/,b'.b
<;4, u iu, 3c;ii
3 , 1 < c? , t> » u
t5D,ly-4V,'y-4b
i , / / o , u u c
^ >> , 1 •' b . i J y
1 , f i b , b ' r
11, 1 3 <: , H •• i
u , i " i i i ^> i b i "
•« r1 ,'•'", 1C)
?• , i i p. , / r- /
b, i d, t >"
r\, , 4.J-J
1 . , 1 Ji .<• ••<
-< , b '/,!•"•
1 1 , / n / , n | »
0,1 (U, 1 I1!
1 , :i . / , - ' f1
" s 1 , 1 '.• b
^ F S S LJ , ^ j 4
eTf1, Mod , be' 7
1 ,bo.l, bbi
1 . fj •; V , :. ;
b^ -t , i . L.
3. /vj.ubj
11 ,-J^t;, b-u
n, 1 1.0, biO
bi,<>ob«;<'^
v u , 1 j f , ti u 1
uoc , ^t,rt , /b j
be1
Jb
1 /
10
13
CU
b
A
o
cb
1 /
rf
1 /
l1'
p
jl
i
c ^
i
J S
1 :
; >
r t
HI
)f
ol
C 1
1 1
ud
„
u
4 W
'h
/ ^
bh
Oc;
12
V Includes obligation of $144,350,394 for increases to PL 84-660 projects.
13
-------
STATUS Uf ««T CONSTRUCTION l»H*NT
UNUtK HL 9i
UF MAH, il,
REGION
STATt
HtGIUN TU1AL3
01 CT
MA
«t
Nn
HI
VT
HtlilUN 10TAL3
02 NJ
N1
HN
vl
WtlilUN IUTALS
Oi OC
Ut
MU
PA
VA
••V
MtlllUK ILJ1AL5
(j (4 At.
hi
UA
SC
TN
Oo
37
1L
IN
Ml
gn
Hi
IUTALS
AM
LA
ur,
tx
UM 4L.S
1A
MU
KtblUf" 1UI4L5
)e cu
11
NO
SU
ul
IV
IU1ALS
Li
I'll
HJ
s»
IIJ F A L b
An
IJH
»t
IhULS
NAllU" TuI»l,S|
f. Y, l<*7i, 1974,
1V76
iUO,6bU,7UQ
bri^objOoo
If JOO, 6H6, 7uO
. '00
>, IVbiUUO
f, lbO,6UO
J,Bell , 1 UO
oo»
rOUU
r 1 UU
li^,iio,1UO
WdO,ind, luu
I1", 1 94, 7uO
1 l,OVb, /UO
, nii, Uu
,i-iO. 1UO
l , lci» luu
J, 1 il ,460,OuU
jo,ou2,buO
Ibu,109,buo
«bo,9y7,buu
, 107
31,
66,
Ji.U
Vi7,199,ioU
00,101,liU
iu9,«biJ, iub
di,Idl.bOb
j^,K4o,^75
iJ, S*li,GU5
Jb, IZl , Ibt,
1 i i , u 1 U , U i 0
1 JO, >*<*!, DS 7
t'01',o9l , 1 ib 1 ,00**, Ouo, Jo«
1^1, jdj, bOb dlb, 7Mi, 1 Itf
H/,tiD,D7o tv/,e^D,^ju
(>u, ubo, I Ou
' ,01 I ,0 10
b,«rio,o«g
^, u(Sb,ol j
be!, it)i, BiJw
a, idi,Dbi
juj,o it,xbb
li "J1, U 01)
10,
> ioj
I/ Includes obligation of $172,300,Ml for increases to PL 84-660 projects.
-------
o
UJ
O
z
LL
CO
a
111
z
cc
LU
DO
D
Z
250 -i
225^
200-
175-
.150 -
125-
100-
75-
50-
25-
NEW PROJECTS FUNDED
WWT CONSTRUCTION GRANTS UNDER PL-92-500
DISTRIBUTION BY STEP
JUL
AUG SEP OCT NOV
DEC
JAN
FEB MAR APR MAY JUN
« STEP I
STEP
STEP
TOTAL ALL STEPS
JULY
AUGUST
SEPTEMBER
OCTOBER
NOVEMBER
DECEMBER
JANUARY
FEBRUARY
MARCH
APRIL
MAY
JUNE
43
88
157
128
117
115
150
218
175
($1.7)*
($6.4)
($3.6)
($4.5)
($8.7)
($10,2)
($9.0)
($13.9)
(S19.3)
4
18
11
7
20
15
21
8
26
($2.5)
($2.8)
($5.3) '
($1.4)
"($4.0)
($3.6)
($2.5)
($5.6)
($3.3)
28
45
48
38
37
30
44
36
40
($61.4)
($122.5)
($130.3) .
($152.51
($94. 1)
(S36.8)
($115.5)
($79.2)
($162.3)
75
151
216
173
174
160
215
262
241
($65.6)
($131.7)
(S139.2)
($158.4)
($106.7)
($50.6)
($127.0)
($98.7)
($184.9)
* ALL FIGURES IN MILLIONS OF DOLLARS
15
-------
Totals
WWT CONSTRUCTION GRANT PROJECT ACTIVITY
UNDER P.L. 92-500
MARCH 31, 1975 I/
Step III Projects 2/
Regi on
I
II
III
IV
V
VI
VII
VIII
IX
X
Total
Number of
Active Projects
120
132
265
563
461
523
271
271
155
241
Step I
Projects
16
39
56
419
275
369
84
217
34
81
Step II
Projects
3
23
35
37
14
37
53
4
4
21
Projects
Awaiting
Construction
43
34
- 85
28
32
84
35
3
27
13
Projects
Under
Construction
58
36
89
79
140
33
99
47
90
126
Total
101
70
174
107
172
117
134
50
117
139
3,002
1,590
231
384
_!_/ Preliminary Figures.
2/ Includes Step 2+3 Projects awarded prior to July 1, 1974.
797
1,181
16
-------
Totals
$4,286,803
WWT CONSTRUCTION GRANT PROJECT ACTIVITY
UNDER P.L. 92-500
MARCH 31, 1975 I/
($ in Thousands)
Region
I-
II
III
IV
V
VI
VII
VIII
IX
X
Total
Active
Projects
$387,242
963,784
756,701
385,358
792,622
206,631
179,296
53,070
367,651
' 194,448
Step I
Projects
$1,705
12,065
3,940
25,836
18,616
15,353
1,658
3,965
18,166
3,674
Step II
Projects
$538
22,459
14,975
7 ,652
3,711
4,395
9,519
507
2,638
5,200
Project
Awaiting
Construction
$124,335
267,749
269,848
125,107
183,814
136,619
23,918
2,798
53,084
6,517
Step III Projects 2/
Project
Under
Construction
$260,664
661,511
467,938
226,763
586,481
50,264
144,201
45,800
293,763
179,057
Total
$384,999
929,260
737,786
351,870
770,295
186,883
168,119
48,598
346 ,847
185,574
$104,978
$71,594
$1,193,789
]_/ Preliminary Figures.
2J Includes Step 2+3 Projects awarded prior to July 1, 1974.
$2,916,442
$4,110,231
17
-------
CUMULATIVE MONTHLY BREAKDOWN OF ACTIVE PROJECTS FUNDED UNDER PL 92-500
($ in Millions)
Step I projects have increased 239% in number and 157% in grant dollars since the beginning of the fiscal year.
JULY 1974
AUGUST
SEPTEMBER
OCTOBER
NOVEMBER
DECEMBER
J.ANUARY 1975
FEBRUARY
MARCH
525
599
718
846
964
1076
1220
1429
1590
% of
Total
33%
35
38
41
44
46
48
51
53
STEP I
% of
$ Total
$43.0 2%
49.4 2
53.0 2
57.5 2
66.2 2
74.0 2
89.6 2
98.8 2
105.0 2
#
143
160
172
169
181
195
214
217
231
% of
Total
9%
9
9
8
8
8
8
8
8
STEP II
% of
$ Total
$42.1 1%
46.2 1
51.2 1
49.9 1
53.9 1
58.9 2
59.4 2
71.3 2
71.6 2
STEP III V
% of % of
# Total $ Total
908 58%
953 56
983 53
1031 51
1045 48
1057 46
1133 44
1159 41
1181 39
$2894.7 97%
3044.0 97
3195.9 97
3371.0 97
3464.5 97
3515.6 96
3786.5 96
3892.4 96
4110.2 96
TOTAL
# $
1576
1712
1873
2046
2190
2328
2567
2805
3002
$2979.8
3139.6
3300.1
3478.4
3584.6
3648.5
3935.5
4062.5
4286.8
APRIL
MAY
JUNE
V Includes Step 2+3 Projects awarded prior to July 1, 1974.
18
-------
DISTRIBUTION OF PL 92-500 CONSTRUCTION ACTIVE PROJECTS BY MUNICIPALITY POPULATION
AS OF FEBRUARY 28, 1975
(S in MILLIONS)
65 % of the projects and 16 7, of the grant funds awarded were for communities with census population of
10,000 or less.
STEP
CODE CENSUS POPULATION
1 LESS THAN 2,500
2,500-5,000
5,001-10,000
10,001-25,000
25,000-50,000
MORE THAN 50,000
NOT REPORTED I/
STEP TOTAL:
2 LESS THAN 2,500
2,500-5,000
5,001-10,000
10,001-25,000
25,001-50,000
MORE THAN 50,000
NOT REPORTED I/
STEP TOTAL:
3 2/ LESS THAN 2,500
2,500-5,000
5,001-10,000
10,001-25,000
25,001-50,000
MORE THAN 50,000
NOT REPORTED I/
STEP TOTAL:
ALL STEPS LESS THAN 2,500
2,500-5,000
5,001-10,000
10,001-25,000
25,001-50,000
MORE THAN 50,000
«nT ".^PORTED I/
STEP TOTAL:
NUMBER OF
PROJECTS
597
235
197
177
82
138
3
1,429
79
26
14
26
22
46
4
217
414
127
135
161
78
226
18
1,159
1,090
388
346
364
182
/i 1«
25
7, OF
TOTAL STEP
42
16
14
12
6
10
-
36
12
7
12
10
21
2
36
11
12
14
7
19
1
39 '
14
12
13
6
lri
1
AMOUNT AWARDED
S 8.3
7.8
8.1
11.1
16.1
46.6
.8
$ 98.8
$ 3.6
3.4
1.7
4.8
13.9
42.6
1.3
$ 71.3
$ 223.0
148,9
248.6
515.4
392.1
2,328.1
36.3
$ 3,892.4
$ 234.9
160.1
258.4
531.3
422.1
2,417.3
is.i
% (IF
TOTAL STEP
9
H
8
11
Id
47
]
5
5
2
7
19
60
2
6
4
6
13
10
60
I
6
4
6
13
10
60
1
TOTAL
2,805
100
S 4,062.5
I/ CENSUS POPULATION NOT REPORTED IN THE GRANTS INFORMATION AND CONTROL SYSTEM.
21 INCLUDES STEP 2+3 PROJECTS AWARDED PRIOR TO JULY 1, 1974.
100
19
-------
DISTRIBUTION OF INCREASES TO FL 84-660 WWT CONSTRUCTION GRANT PROJECTS USING PL 92-500 CONTRACT AUTHORITY
FUNDS
(AS OF MARCH 31 , 1975)
IIS ($52 Million) of FY 75 funds obligated were for increases to PL 84-660 projects
# of Total Grant' FY 73 FY 74 FY 75
increases Increases $ Funds Funds Funds
TOTALS
REGION I
371
5
181,480,107
2,324,149
27,950,447
718
91,971,276
2,194,776
52,379,118
122,650
FY 72 & Prior ]/
Funds (PL 84-660)
9,179,266
6.005
Connecticut
Maine
Massachusetts
New Hampshire
Rhode Island
Vermont
REGION II
Hew Jersey
2
2
1
2
I
1,469,381
854,050 •
718
16,222,962
12,754,242
718
3,468,720
1,464,531
730,245 •"
122,650
12,754,242
12,754,242
4,850
1,155
New York
Puerto Pico
1
3,468,720
3,468,720
Virgin Islands
REGION III
7
9,905,450
81 ,499
7,984,350
1,393,770
445,831
Delaware
Maryland
Pennsylvania
Virginia
West Virginia
Dist.of Columbia
REGION IV
Alabama
Florida
Georgia
Kentucky
Mississippi
North Carolina
South Carolina
Tennessee
REGION V
2
2
\
2
122
14 '
3
18
22
13
20
17
15
17
891 .700
6,427,580
1.192.400
1 .393.770
55,928.939
8,978,900
1,164.970
2.053.752
11,142,790
7,882,910
18,224.300
3,165.576
3,315,741
26,391 ,816
81 ,499
16.835.516
845,812
483.209
2.345,646
9.735.394
1.870,810
1,554,655
288,030
891.700
5,900,250
1 .192.400
10.585.943
1.234.490
930.265
2.657.129
4.071.003
46,470
1.646.586
22.330.383
1.393.770
27.705.805
6.880.320
1.164,970
430.820
11. 112.790
2.588.563
4.297.980
1.200.362
14.700
445,831
801.675
18.278
209,458
291 .572
119.933
47.934
114.500
3.758.703
Illinois
Indiana
Michigan
Minnesota
Ohio
Wisconsin
REGION VI
Arkansas
Louisiana
New Mexico
Oklahoma
Texas
REGION VII
Iowa
Kansas
Missouri
Nebraska
REGION VIII
Colorado
1
1
14
1
64
11
8
4
11
30
49
22
8
8
11
26
10
3,320,405
4,072,011
18,984,700
14,700
29,173,221
3,369,522
4,379,482
100,121
1,225,090
20,099,006
17,487,820 ,
4,214,818
2,589,194
9,585,047
1,098,761
3(190,520
?.i76 fin?
288,030
91 ,872
91,516
356
473,279
464,250
9,029
23,997
4.062_,941
18,243,445
24,628,038
569,697
4.009,342
4,599
1.070,330
18.974.070
10,284,782
204.550
1.048.764
8,730.817
300,651
2.071 ,815
1 627 S51
14,700
2,719,435
2.719,435
5.248J27
3.979.997
225.680
367.490
675.160
721 .83£
R40 30?
3,296.408
9.070
453,225
1,733,876
80.390
370.140
4.006
154. 76D
1.124.580
1 .481 .432
30.271
1.314.750
?2.490
113.921
396.807
K iRd
Montana
North Dakota
South Dakota
Utah
WyominK
REGIOK IX
Arizona
California
Hawaii
Nevada
3
2
6
5
45
5
35
i
Rl .466
196,959
633,592
101,895
18,100,249
2,680,518
12,632,931
1 ,042 ,800
5,666,730
1,119,105
3,803,625
167
153,026
188,075
101,896
10,877,182
1,489,115
8,345,267
1 ,042,800
fiD 499
17,934
83,163
70,920
70,920
25.999
362.354
485.417
1.378
484.039
American Samoa
Tr. Terr. of Pac.Islds,
Guam
BEGION X
Alaska
Idaho
4
34
1
14
1 ,744,000
2,754,981
25,290
1,556,148
1 ,744,000
44,083
20,518
1 ,014,007
343,837
1,627,371
25,290
1 .179,517
69,520
12.276
Oregon
Washinfrton
19
1,173,543
23,565
670,170
422,564
57.244
I/ PL 84-660 Funds obligated together with PL 92-500 Contract Authority Funds.
20
-------
REGION
STATE
FY 74 - 75
ORIGINAL ALLOTMENTS
STATUS OF WWT CONSTRUCTION ALLOTMENTS AND PROJECTED FY 75 PROJECT FUNDING
MARCH 31, 1975
ALLOTMENTS AVAILABLE I/
FOR OBLIGATION
AS OF 3/31/75
CURRENT PROJECT 2/
PRIORITY LIST
NO. $
APPLICATIONS IN PROCESS 3/
NO. $
DIFFERENCE 4/
REG. I
CT
HA
HE
NH
RI
VI
REG. II
NJ
NY
PR
VI
REG. Ill
Dfi
DE
UD-
FA
VA
wv
BEG. IV
AL
FL
GA
KY
MS
NC
SC
TN
REG,'V
IL
IN
MI
OB
WI
REG. VI
AR
LA
NH
OK
TX
REG. VII
IA
KS
MO
NB
REG. VIII
CO
MT
KD
SD
UT
UY
REG. IX
AZ
CA
cu
HI
sv
PI
SA
REG. X
AK
ID
OR
UA
119,972,900
202,943,900
55,252,000
59,999,950
35,531,000
18,454,800
485,776,200
822,388,200
67,367,900
5,809,900
59,575,800
41,510,300
181,874,100
385,386,100
186,101,400
52,733,700
44,621,150
273,288,400
105,343,000
84,980,600
34,151,700
98,181,200
75,287,000
83,186,800
439,778,700
164,664,100
428,079,400
125,204,300
336,589,700
104,605,400
34,468,110
63,835,850
16,994,500
60,821,410
189,982,250
74,035,800
51,418,500
124,214,400
32,018,000
40,428,900
12,520,600
8,277,100
10,152,800
20,803,600
4,653,450
21,733,750
751,948,100
4,783,000
51,049,000
27,326,600
1,658,300
720,700
21,815,100
14,429,400
59,618,700
91,448,500
89,497,793
114,633,591
12,417,060
17,226,734
13,557,675
10,664,232
276,368,660
451,556,277
65,237,888
2,721,650
7,609,130
29,313,940
51,230,505
215,936,990
75,446,630
45,740,060
27,821,578
136,083,761
87,457,022
58,428,317
18,900,194
81,142,227
54^651,197
70,675,644
429,766,870
144,681,598
377,069,614
44,758,612
300,023,514
50,288,730
18,314,060
53,650,015
•16,671,126
50,451,995
79,841,536
39,753,890
34,836,396
59,963,659
10,739,701
19,143,282
'1,374,710
5,391,783
6,532,515
16,489,687
1,536.646
16,302,097
602,387,189
4,788,000
39,450,600
300
704,200
3,566,556
1,762,900
14,911,640
11,999,059
18
31
47
65
35
84
105
119
30
7
7
40
42
15
166
89
69
119
208
129
95
47
103
549
3
16
17
288
12
59
85
45
360
20
91
98
52
52
22
20
165
80
59
12
110
9
1
9
a
22
96
87,040,000
87,153,750
117,068,000
18,309,000
138,681,000
10,743,780
207,675,874
400,012,395
63,872,833
2,039,000
16,520,250
490,189,946
12,263,425
157,275
4,517,000
935,390
7.901,250
29,631,365
0
3
6
6
2
5
14
19
1
1
5,615,325
82,778,665
126,998,670
12,675,320
37,317,630
20,732,190
181,874,178
49,375,000
53,761,589
12,415,950
44,787,850
33,326,895
60,995,727
344,716,752
1,055,000
180,449,250
84,734,194
167,422,567
21,008,500
L5,uo3,500
36,008,593
6,737,898
40,705,604
40,352,895
32,704,880
19,701,428
37,225,107
4,565,810
14,213,000
494,700
7,169,625
2,895,484
23.078,550
7
0
26
27
26
13
44
11
9
15
32
12
17
67
40
26
20
31
11
14
8
]
29
21
35
59
48
2
6
1
1
6
11
36
6
4,885,600
36,665,842
1,803,686
5,479,650
343,852
45,990,676
49,101,173
674,250
4,874,250
14,290,270
19,661,920
55,062,230
10,461,700
13,416,680
2,724,627
45,199,721
1,762,000
283,775
1,014,745
20,664,750
515,454
1,794,626
162,230,874
9,465,809
60,669,905
1,382,950
128,451,154
8,830,174
707,779
1,496,234
397,370
1,552,965
12,927,405
13,823,040
13,468,800
24,309,650
40,200
5,117,730
22,500
271,350
475,628
2,834,300
1,392,570
105,731,169
4,391,232
315,018
1,149,006
755,914
2,457,793
22,594,041
-144,316,782
2,885,952
-130,602,975
-423,400
22,702,310
2,442,709
690,805
-4,191,600
7,609,130
9,408,345
-51,210,080
33,876,090
52,309,610
4,994,250
4,364,761
-90,990,138
36,320,022
4,382,953
5,469,499
15,689,627
20,808,848
. 7,885,091
-77,180.756
134,160,789
135,950,459
-41,358,532
4,149,793
20,450,056
2,522,781
16,145,188
9,535,652
8,193,426
26,561,236
-6,774,030
1,666,168
-1,571,098
6,133,691
-187,448
857,510
-2,049,192
3,161,403
-9,423,163
1,536,646
16,302,097
584,474,369
-591,133,115
22,795,943
-156,975
704,200
-950,444
512,492
5,861,384
-18,388,220
I/ Figures do not Include $19,106,340 in FY 73 recovered funds.
2_/ Project* shown Id GICS aa on Project Priority List for'Miich applications have not been received In Regional Office.
3/ Applications shown In GICS aa in process in Regional Office.
^/ Difference between Available Funds (3/31/75) and dollars that would be required to fund Applications in process
and projects remaining on Project Priority Lists. A negative amount indicates that the unfunded projects remaining on the approved
State Project List exceed available allotments.
21
-------
WPC STATE & INTERSTATE PROGRAM ACTIVITY
MARCH 1975
The FY 75 Advice of Allowance to-date is $50 Million. $44.9 Million has been awarded
through the end of March. $5.1 Million remains available to fund increases to existing grants.
75
60
45
30
EXPECTED LEVEL OF FUNDING FY 1975:
REGION
I
II
III
IV
V
VI
VII
VIII
IX
X
TOTAL
CUMULATIVE DOLLARS
AWARDED :
JUL
AUG
SEPT
OCT
NOV
DEC
JAN
FEB
MAR
APR
MAY
JUN
APPLICATIONS
IN PROCESS
REMOVED FROM
PROCESSING
APPLICATIONS
IN PROCESS
3/1/75
NO.
0
0
6
0
0
0
2
0
1
0
9
$
0
0
916
0
0
0
232
0
59
0
$1,207
RECEIVED
NO.
3
1
2
0
1
4
0
4
1
(1)
16
$
154
298
313
0
98
639
0
193
132
66
$1 ,893
FUNDED
NO.
3
1
1
0
1
4
0
4
1
(D
15
$
154
232
360
0
98
639
0
193
132
66
$1 ,874
(INCL. REJECTIONS)
NO.
0
0
1
0
0
0
1
0
0
0
2
$
0
0
101
0
0
0
89
0
0
0
$190
ADJUSTMENTS 3/31/75
$
0
-66
0
0
0
0
0
0
0
0
$-66
NO.
0
0
6
0
0
0
1
0
1
0
8
$
0
0
768
0
0
0
143
0
59
0
$970
22
-------
WPC STATE AND INTERSTATE PROGRAM - DOLLARS FUNDED
March 1975
The cumulative dollars awarded throuah the first nine months of FY 75 was 19% ($7.2 Million) more than during the first nine months of FY 74
STATE
REGION I
Connecticut
Maine
Massachusetts
New Hampshire
Rhode Island
Vermont
REGION II
^ew Jersey
New York
Puerto Rico
Virgin Islands
REGION III
Delaware
Maryland
Pennsylvania
Virginia
West Virginia
Dist. of Columbia
REGION IV
Alabama
Florida
Georgia
Kentucky
Mississioni
North Carolina
South Carolina
Tennessee
REGION V
11 linois
Indiana
Michioan
Minnesota
Ohio
Wisconsin
CUMULATIVE
TO
DATE
735,298
543,900
1,048,600
329 ,225
436,558
277,544
1,099,210
2,555,252*
651 ,056
293,155
259,753
539,834
1,689,461
925,707
359,293
279,503
1,156,626
1,278,665
1,430,030
588,300
740,945
1,794,352
994,301
881 ,734
1,740,601
1 ,021 ,100
1,739,889
851,767
1 ,531.484*
I,3b6,05l
STATE
REGION VI
Arkansas
Louisiana
New Mexico
Oklahoma
Texas
REGION VII
Iowa
Kansas
Missouri
Nebraska
REGION VIII
Colorado
Montana
North Dakota
South Dakota
Utah
Hyomi na
REGION IX
Arizona
Cal ifornia
Hawaii
Nevada
American Samoa
Tr. Terr, of Pac. Isl .
Guam
REGION X
Alaska
Idaho
Oreoon
Washincton
INTERSTATE AGENCIES
NEIWPCC
ISC
URBC
1NCOPOT
Susquehanna
ORSANCO
CUMULATIVE
TO
DATE
550,700
789,650
314,200
536,223
1 ,921 ,800
561 ,682*
421,828
854,290
557,200
440,892
370,788
209,636
173,928
287,465
203,586
505,050
2,853,848
305,018*
139,923 '
58,913
131,900
235,142*
156,665*
377,405*
680,200*
888,500*
240,600
350,300
139,202
138,004
65,000
324,949
INCLUDES "ART!C!DATirW IN A CONSOLIDATED PROGRAM r,RAK!T.
TOTAL
444,923,681
23
-------
MILLIONS
60
48
36
24
12
AIR POLLUTION CONTROL PROGRAM ACTIVITY
MARCH 1975
The FY 75 Advice of Allowance to-date is $52.3 Million. $21.8 Million has been
awarded through the end of March. $30.5 Million remains available for award.
EXPECTED LEVEL OF FUNDING FY 1975
APPLICATIONS IN PROCESS (EOM)
CUMULATIVE DOLLARS
AWARDED
APPLICATIONS
IN PROCESS
REMOVED FROM
PROCESSING
APPLICATIONS
IN PROCESS
REGION
I
II
III
IV
V
VI
VII
VIII
IX
X
3/1/75
NO.
0
1
21
1
9
0
2
0
0
0
$
0
155
"5,374
40
1,563
0
239
0
0
0
RECEIVED
NO.
0
1
15
0
1
3
1
0
1
0
$
0
50
420
0
30
458
82
0
20
0
FUNDED
NO.
0
1
15
0
4
3
2
0
1
0
$
0
155
1 ,724
0
942
458
211
0
20
0
(INCL. REJECTIONS)
NO.
0
0
6
0-
1
0
0
0
0
0
$
0
0
1,345
0
9
0
0
0
0
0
ADJUSTMENTS 3/31/75
$
0
0
0
0
-15
0
-28
0
0
0
NO.
0
1
15
1
5
0
1
0
0
0
$
0
50
2,725
40
627
0
82
0
0
0
TOTAL
34
$7,371
22 $1,060
26 $3,510
$1,354
$-43
23
$3,524
-------
AIR POLLUTION CONTROL PROGRAM GRANTS AWARDED
TO STATE AND LOCAL AGENCIES
($ in Thousands)
The cumulative dollars awarded through the first nine months was 29% ($5.0 Million} higher
than during the first nine months of FY 74.
TOTAL
STATE AGENCY AWARDS
LOCAL AGENCY AWARDS
TOTAL
STATE AGENCY AWARDS LOCAL AGENCY AWARDS
Cumulative
STATE
REGION I
Connecticut
Maine
Massachusetts
New Hampshire
Rhode Island
Vermont
REGION 11
New Jersey
New York
Puerto Rico
Virgin Islands
REGION III
Delaware
Maryland
Pennsylvania
Virginia
West Viroinia
Dist. of Col .
REGION IV
Alabama
Florid?
Georgia
Kentucky
Mississippi
North Carolina
South Carol ins
Tennessee
REGION V
11 1 inois
Indiana
Michigan
Minnesota
"hio
Wi sconsiti
FY 75
450
.
.
-
-
-
208
1,614
~
.
177
296
790
Gfil
270
132
276
415
144
-
1
-
-
75
2,433
1,024
1 ,949*
325
2,165
44
Month
Cumulative of
FY 75 Mar.
450
„
-
-
-
-
-
1 ,000
-
-
177 177
-
-
588 588
260
132 132
276
-
17
-
1
-
-
22
; ,822
849
924
96
G25
-
Cumulative
FY 75
-
.
-
-
-
^58
614
-
-
-
296
790
73
10
-
-
415
127
-
-
-
-
53
611
175
1 ,025
229
1,540
44
Month
of
Map.
-
-
-
-
-
-
-
155
-
-
-
296
448
73
10
-
-
_
_
-
-
-
-
-
324
50
-
-
568
-
STATE \
REGION VI
Arkansas
Louisiana
New Mexico
Oklahoma
Texas
REGION VII
Iowa
Kansas
Missouri
Nebraska
REGION VIII
Colorado
Montana
North Dakota
South Dakota
Utah
Wyoming
REGION IX
Arizona
California
Hawai i
Nevada
American Samoa
Tr. Territories
Guam
REGION X
Alaska
Idaho
Oregon
Washington
TOTALS 3-31-75
TOTALS 1-31-74
Cumulative
FY 75
327
366
421
520
2,502
-
99
393
96
583
333
84
28
150
100
5
152
-
-
-
-
70*
131*
304*
638*
1 ,036*
S21 ,837
$16.865
Month
Cumulative. of
FY 75 Mar.
327 202
366 191
341
520 64
1,925
-
-
-
-
479
333
84
28
150
100
-
42
-
-
-
-
70
68
304
. 638
1,036
$14,050 51,354
510,540 51,573
Cumulative
FY 75
-
-
80
-
577
-
99
393
96
104
-
-
-
-
-
5
no
-
-
-
-
-
63
-
-
-
$7,787
$6,325
Month
of
Mar.
-
-
-
-
-
-
-
115
96
-
-
-
-
-
-
-
20
-
-
-
-
-
-
-
-
-
.,2,155
$ 84
Includes Participation in Consolidated Program Grant.
25
-------
PROGRAM
DISTRIBUTION OF HEADQUARTERS GRANT AWARDS BY TV?E OF ACTION
7/1/74 - 3/31/75
($ in Thousands)
44% of the grants awarded and 42% of grant dol'lars were for new projects during the first nine months of FY 75.
NEW CONTINUATION _. INCREASE
TOTAL
186
44
$7,772
42
115
27
$6,417
35
119
29
$4,220
23
TOTAL
RESEARCH
DEMONSTRATION
TRAINING
FELLOWSHIP
#
in
12
14
49
% OF
Total
44
33
23
72
s
5,524
1,437
551
260
% of
Total
47
36
23
93
#
82
4
29
0
% of
Total
32
n
48
0
s
$4,591
390
1,436
0
% of
Total
39
10
59
0
#
62
20
18
19
% of
Total
24
56
29
28
$
$1 ,600
2,161
440
19
% of
Total
14
54
18
7
#
255
36
61
68
$
11,715
3,988
2,427
279
420 $18,409
26
-------
ACTIVE GRANTS - HEADQUARTERS AWARDED
Geographic Distribution by State and Region
MARCH 1075
The $65.8 Million total active grant dollars awarded by EPA Headquarters as of March 31, 1975,
decreased $1.'6 Million from the $67.4 Million active grant dollars as of March 31, 1974.
REGION I
Connecticut
Maine
Massachusetts
New Hampshire
Rhode Island
Vermont
REGION II
New Jersey
New York
Puerto Rico
Virgin Islands
REGION III
Delaware
Marylancj
Pennsylvania
Vii ,inia
West Virginia
Dist. of Col .
RESIGN IV
Alabama
Florida
Georgia
Kentucky
Mississippi
North Carolina
South Carolina
Tennessee
REGION V
Illinois
Indiana
Michigan
Mi nnGsot
-------
RESEARCH & DEMONSTRATION (NOS.) I/
NOS.
MARCH 1975
The cumulative number of awards through the nine months of FY 75 was
291 compared to 258 during the same period of FY 74.
250 f
225
200
175
150
125
100
75
50
25
JULY,
AUGUST
SEPTEMBER OCTOBER NOVEMBER DECEMBER JANUARV FEBRUARY
AWARDED
s
283.
MARCH
APRIL
MAY
JUNE
NO. APPLICATIONS
IN PROCESS
3/1/75
RECEIVED
REMOVED FROM
PROCESS
FUNDED
• IN PROCESS
M END OF MO.
REMOVED FROM
PROCESSING
(IdGL. REJECTIONS)
NO. APPLICATIONS
IN PROCESS
3/31/75
54
139
23
12
4
18
23
54
8
12
2
6
11
42
5
3
0
3
3
4
1
0
0
0
63
147
25
21
6
21
AIR
WATER
SOLID WASTE
PESTICIDES
RADIATION
CONSOLIDATED
TOTAL 250 105 64 8
V Headquarters grants only. Does not include grants administered by the Regions.
283
28
-------
RESEARCH & DEMONSTRATION ]/
MILLIONS
$ 50
40
30
20
10.
MARCH 1975
The cumulative dollars awarded through the first nine months of FY 75 was
$15.7 Million compared to $13.0 Million during the same period of FY 74.
APPLICATIONS IN PROCESS (COM)
JUL
CUMULATIVE DOLLARS
AWARDED
AUG
SEP
OCT
MOV
DEC
JAN
FEB
MAR
APR
MAY
JUN
APPLICATIONS
IN PROCESS
3/1/75
RECEIVED
FUNDED
REMOVED FROM
PROCESSING
(INCL. REJECTIONS)
ADJUSTMENTS
AIR
WATER
SOLID WASTE
PESTICIDES
RADIATION
CONSOLIDATED
TOTAL $27,666 $12,686 $3,621 $799
]_/ Headquarters grants only. Does not include grants administered by the Regions.
$-157
APPLICATIONS
IN PROCESS
3/31/75
$3,060
13,624
8,751
680
190
1,361
2,440
7,746
888
986
66
560
587
2,319
368
193
0
154
97
615
87
0
0
0
-76
+56
-136
0
0
-1
4,740
18,492
9,048
1,473
256
1,766
$35,775
29
-------
TRAINING AND FELLOWSHIP I/
MARCH 1975
The first nine months cumulative number of awards was 129 ($2.7 Million) compared to
181 ($3.8 Million) during the same period of FY 74.
THOUSANDS
$12,500
10,000
7,500
APPLICATIONS tN PROCESS (EOM)
CUMULATIVE DOLLARS
AWARDED'
AUG
I SEP I OCT [ NOV |
DEC
JAN
FEB MAR
APR
MAY
JUN
APPLICATIONS
IN PROCESS
3/1/75
RECEIVED
FUNDED
REMOVED FROM
PROCESSING
(INCL. REJECTIONS)
ADJUSTMENTS
APPLICATIONS
IN PROCESS
3/13/75
1
629
,240
101
0
0
12
216
1,007
359
190
0
0
0
0
61
310
0
0
0
0
0
71
66
0
0
0
• o
0
0
-9
0
0
0
0
0
1,504
1,214
291 .
0
0
12
216
AIR
WATER
SOLID WASTE
PESTICIDES
RADIATION
CONSOLIDATED
UNASSIGNED
TOTAL $2,198 $1,556 $371 $137
]_/ Headquarters grants only. Does not include grants administered by the Regions.
$-9
$3,237
30
------- |