United States
Environmental Protection
Agency
&EPA
Region 5
Water Division
230 South Dearborn Street
Chicago, Illinois 60604
January 1988
Complete Data Base for:
Evaluation of Predicted and
Actual Impacts of Construction
Grants Projects in Three River
Basins of Region V
Saginaw River Basin
x
^ Maumee River Basin
Lower Portion of Upper Mississippi River Basin
-------
COMPLETE DATA BASE FOR:
EVALUATION OF PREDICTED AND ACTUAL IMPACTS
OF CONSTRUCTION GRANTS PROJECTS IN THREE RIVER BASINS OF
REGION V
JANUARY 1988
Prepared by:
United States Environmental Protection Agency
Region V
Environmental Planning Section
230 South Dearborn Street
Chicago, Illinois 60604
and
Science Applications International Corporation
8400 Westpark Drive
McLean, Virginia 22102
-------
C6AUGP7
CITY
as PfEOICT-D TO ?FTTcR THAN PREDICTED
(UY
-------
C64UGe7 AS PFEOfCrED TO 3ETICR THAN PREDICTS
CITY GPANTEt COUNTY ST RIVER BASIN NEPA(YH)
DOWNSTREAM. 1184=11 £, 3.2 UPSTREAM £ 10 C 6.9 DOWNSTREAM
MORE FINDINGS: WATER QUALITY WAS IMPROVED ou: TO ELIMINATION OF THE RAW SEWAGE DISCHARGE
CRICERSVILLE C P ID£R3V ILLE, VILLAGE OF AUGLIAIZE OH HAUMEE RIVER BASIN 1977 7
ISSUE: WATER QUAL/SURFAC :
PREDICTION: INCREASE KATE* QUALITY IN RECEIVING STREAM AND SLITNATE WEATHER OVERFLOWS.
FINDINGS: STREAM DUALITY HAS IMPROVED DOWNSTRc AM.BOO IS 4.6 MG/Li SS IS 9.0 HG/L, 0.0. IS 6.2 MG/L.
EFRLU:MT QUALITY IN MAY H83 FOR N;W PLANT - eoo=n MG/L, ss=io MG/L,O.O.= 5.4 MG/L
MOUr FINDING?: WiT^R JU&LITT HAS NCTIC-.A8LV IMPROV-0 !M STPE AM. AFFLUENT QUALITY IS BFTTER
HARFOD H«kR']P, VILLAGE OF ALLEN OH 1AUMEE RIVER BASIN 1977 8
i R QUAL/SUSFACE
rO WATER QUALITY
FINDINGS: tM'POV'D WATiS QUALITY IN STREAM NEAR DlSCHAP&c Af4D DOWNSTREAM
MOR: FTND1NG35 IMPROVED WST-'R OUALITY.
DOMMSTRfAM COJ IS 4.5 MG/L, TSS IS 2?. 5 MG/L AND 0.0. IS 3.8 MG/L
KALIPA ' KALT?*,VlLLAt-E "IF .. PUTNAM OH MAUMEE RIVER BASIN 1976 9
ISSUI: '.4AT5P QUAL/G»3IJfi3
FINDINGS?
MORC FINDINGS: ALTHOUGH in P-^OIC*IIN MAS MAOT, CITY SOURCES STATED THAT NO DRINKING WELLS HAD EVER BEEN TAINTED.
RAL!PA KiL IDA, VILLAGE TF PUTNAM OH MAUMEE RIVER BASIN 1976 1C
ISSUE: WAT'R .JUAL/SURPAC:
. PREDICTION: fLimi CLrdRLP, OPOrS Wr;?E ?LIMIMAT?D.
T FIHCINGS: ELIMIIMTION OF SEPTIC TANK us: HAS RESULTED IN IMPROVED WATER QUALITY TO PLUM CREEK AND OTTOWA RIVER.
MONTPELIFR MONTPfLIE? SWG TRT PLT WILLIAMS OH MAUMEE RIVER BASIN 1983 11
ISSUE: WATE QUAL/SURFACE
PREDICTION: INCREASED URBANIZATION WILL RESULT IN GREATER AMOUNTS OF URBAN RUNOFF WHICH WILL OECR. STREAM QUALITY
FINDINGS: nv uprAti OCVCLOPME'IT HAS RESULTED OF SIGNIFICANCE TO INCREASE URBAN RUNOFF.
MORE FINDINGS: NO SIGNIFICANT UPBANIZATION HAS OCCURRED
PCRHAPS FUTURE INDUSTRIAL OPERATIONS W^ULD CHANGE TuE NATURE OF URBAN RUNOFF FLOW
NAPOLEON NAfcOLECN^ HEJJRV QH MAUMEE RIVER BASIN 1977 12
-------
06AUG97
CITY
ISSUE:
PREDICTION!
FINTl'IGS:
AS PREDICTED TO BETTER THAN PREDICTED
;VLP BASIN)
GPANTEi:
WATER QU4L/GRCUUC1
COUNTY
ST RIVER BASIN
NEPA(YR)
E FINDINGS: NO
IMPACTS WERE PREDICTED
IDENTIFIED.
NAPOLEON
ISSUE:
PREDICTION:
FINDINGS:
NAPOLFCN
WATER 3U1L/SURFAC;
HENRY
OH MAUMEE RIVER BASIN 1977
13
EFFLUi.'lT CONCENTRATIONS OF POP?, i > , RTSTfUAL CHLORINE ANO PHOSPHORUS HAVE BEEN REDUCED.
FECAL CJLIFC^M CONCENTRATIONS HAVE ALSO UEEN REDUCED SINCE PROJECT COMPLETION.
PI'.'DtNf.S : N2 pPfPICTICNS REGAPDING WATER QUALITY WERE HADE.PLANT EFFLUENT QUALITY HAS INCREASED SINCE PROJECT
CCMPL:TICN.TH.; TREATMENT PLANT ALSO HAS ADEQUATE CAPACITY TO HANDLE PEAK FLOWS.
RIOGEVILLE CORMEPS MC-IRY COU'ITYCPIPGEVILLI CORNERS) HENRY . OH MAUMEE RIVER BASIN 1976 i
ISSUE: WATER JUAL/G^'JNO
PREDICTION: TH^ P:^PPOSKD ACTION DOES NOT LTSTUR-* -iPDum WATER QUALITY EXCEPT SLIGHTLY DURING CONSTRUCTION
FINDINGS: THERE AS- APPA'^MTLY MO PRODLPMS WITH GROUND WATER QUALITY.
MORF FIMDINGSS GF.3UNP H*T=R IS MOT CUPR^flTLY NCT NEGATIVELY AFFECTED BY THE COMPLETED PROJECT t ITS ASSOC. FLOWS.
AL>Ot Tj-:- PLANT aP'RATOR S-'CALLLO NO P^OSL-.MS A5SCCIAT:D WITH CONSTRUCTION.
FIDGEVILLE
ISSUE:
PREDICTION:
FINDINGS:
OH MAUMEE RIVER BASIN 1976
15
:RS hrtlPY CPU^TY(3IPGEVILLE CORNERS) HENRY
WATER OU4L/SUPFAC-
TH- PfQPO::D ACTION SHOULD «EDl>CF POLLUTION t TURfilOITY LEVELS W/IN THE RECEIVING WATERWAY
THE CHANG? F?OM SEPTIC TANK SY?T=MS TO $:WER LIN'S HAS RESULTED IN DECREASED DISCHARGED POLLUTANTS.
THE TRTATMEIiT. BY THE PLANT PROVIDES AN EFFLUENT T'J THE RECEIVING WATERWAY FAR BELOW THE PERMIT LIMITS
4vc. t :c t ss AP- SPOUT o.T-r.s M^/L AMD ?.5-<».5 «r./L, RESPECT IV^.LY
M0?c FINDINGS:
. r DIC TI?;i Uii ACCUF4TI. POLLUTION A MO TURPIC'ITY HAVE PEEN REDUCED
TOLFDC
ISSUR:
PRfDICTION:
FINDINGS:
DGE WOOD OH MAUMEE RIVER BASIN 198)
WA'ER OUtL/SU^PAC"
PPOJECT WILL ELIMINATE 8YP1SSES DF RAW SEWAGE AND IMPROVE THE QUALITY OF CEDAR CREEK
WATEP QUiLITY HAS IMPROVED.NO HA^D DATA AVAILABLE TU SUBSTANTIATE THIStHOWEVER.
16
MOPE FINDINGS: csvs ARE SAID TO e; UNDER CONTROL DUE TO CONSTRUCTION OF NEW SEWER LINES
TOLF.DC
ISSUE:
PREDICTION:
FINDINGS:
THLECT.CITY OF (TFN MILE CREEK) LIJCA1 OH MAUMEE RIVER BASIN 1977 17
WATiR JUAL/jll?FAC£
'EDUCTION IN TOXKITY OF THE RIVER CAUSED BY CSO'S/RE DUCT ION IN BOD DIRECTLY RELATED TO OVERFLOWS
R^COMME.-JOED S:W:R RELIEF AND INTERCEPTOR UPGRADES WERE COMPLETED AS PLANNED
CCMP.'N-D SEUr? OVERFLOWS H4VE BEEN MITIGATED IN THE COMSINFD SEWER AREAS.
MORE FINDINGS: WATE? QUALITY IN TFN MIL: CREEK HAS IMPROVED DUE TO ABATEMENT OF COMBINED SEMER. OVERFLOWS
-------
C6AUG67
CITY
«S PfEDICTiO TO BETTER THAN PREDICTED
(3T R.:V--;R 9ASIN)
GCAMTci; COUNTY ST RIVER BASIN NEPA(YR)
RELIEF SEWERS HAVE BEEN INSTALLED TO ALLEVIATE HI&H FLOW CONDITIONS IN THE EXISTING SEWERS
TOLEDO
ISSUE:
LUCAS
OH NAUHEE RIVER BASIN 1989
18
FINDINGS:
MORE FINDINGS:
TOLEDO,CITY OF (8AYVIEW)
WATER QU4L/3URFACE
WATER QUALITY WILL IMPROVE AS A RESULT OF THE PROPOSED PROJECT
TACTTRru LEVELS HAVE BEEN REDUCED DUE TO ELI«1INATION OF CSO'S
PHOSPHOROUS LHVELS IN PLANT DISCHARGE HAVE BEEN OcOUCED-NOT SUBSTANTIALLYiHOWEVER.
PLANT DISCHARGE HAS GENERALLY SEEN AN INCREASE IN QUALITY DUE TO PLANT UPGRADES.
PL A I* T DISCHARGES HAVE INCREASED IN QUALITY. SOME PERMIT LIMITATIONS ARE STILL BEING EXCEEDED.
"HUT UPGRADES ARE NOT COMPLETE AND WILL FURTHER INCREASE PLANT OISCHRGE QUALITY.
OVERALL SURFACE WATER QUALITY WILL NOT 9E IMPROVED GREATLY DUE TO EXISTING WATER QUALITY PROBLEMS.
UIIIOPOLIS
ISSUE:
PREDICTION:
FINDINGS:
AUGLAI7E
OH MAU1EE RIVER BASIN 1977
19
UNIOPQLIS,VILLAGE OF
QUAL/'.-RQUND
POSSIBLE BENEFICIAL EFFECT ON GROUNDUATER QUALITY. ELIMINATE INDIVIDUAL WASTE TREATMENT SYSTEMS.
MO KNOWN
HORF FINDINGS
ZHP-CTS JV:O;NT
UNIOPCLIS
ISSUE:
PPEDICTION:
LirilOPOLIS .VILLAGE OF AU'.^LAU: OH MAUMEE RIVER BASIN 1977 20
WATbR QUSL'SUF.pACi:
-------
AS PKEDUTJIQ TC CPTTLR THAh PB£DICT=0
?cDUCING DcTENTION TIM; IF ALLOWED 8» STATE.
ISSUE:
PREDICTION:
FINDINGS:
WA$T?WIT-R TI?MT PLT ?UFFALO
OU»L/GFOUNP
WI UPPER MISSISSIPPI
1983
MOFE FINPiriCS: »IO IMPACT TC GOJUMOWATER HAS 86FN
AUGUSTA
ISSUE:
PREDICTION:
FINDINGS:
SUGUSTi.CITY OF
WATER QUAL/G°OUItD
EAU CLAIRE
WI UPPER MISSISSIPPI
197T
THEFE HAS etcii no GPOUNP HATCR CONTAMINATION AS a RESULT-OF THE PLANT.
TH;PE i: A CfLLLCTIJN SYST'M UND=K THE SLUOGE ORYIflG 6rDS.
MOPE FINDINGS: PFOXIMITY OF PLANT TO THE STREAM MAKES GFOUNOWATER CONTAMINATION UNLIKELY.
THFRE HAS ?trf, us CONTAMINATION OfTECT-D.tn PREDICTION WAS MADE.
27
AUGUSTA
ISSUE:
PREDICTION:
SAU CLAIRE
WI UPPER MISSISSIPPI
1977
28
AUGU3TA.CITY OF
WATER QUAL/SUSPAC£
WAT£P 3U4LITY IF BRIOGE C=?E-:K WILL BE TMPROVED AS ft RESULT OF REOUCHO 800 C SS LOADINGS C CHLORINE.
ACTUAL CnNOITIONS MUCH IMPi-CVtD. AV = R AGc AFFLUENT, 500 = 11 MG/L, SS=12 MG/L.
PF°MIT LIMITS- WINTER 3i-/3n , SU«M t R 20/2C.
MORE FINDINGS: TH; PCES5NT PHUT IS OPERATING W::LL WITHIN ITS P = KMIT LIMITS AND THE WATER QUALITY HAS IMPROVED.
-------
JS
' =OICTHD
(,'Y RIVC
"C BETTER THAU P~EOICTFD
R BASIN)
CITY
BANCO R
ISSUE:
PREDICTION:
COUNTY
ST RIVER BASIN
NEPA(YR)
LACROSSE
WI UPPER MISSISSIPPI 1978
29
RANGU? .VILLAGE OF
WATER QU4L/SURFACE
WATLR QUALITY TF DUTCH CRErK MILL B!; IMPROVED WITH T^ COMPLETION OP THE PROJECT
ACTUAL PLANT MEETING PFSMIT LIMITS 30 300, 30SS, 6-9 PH, 0.5 RES CHLo «100 FECAL.
T AVIRiGS IS ABOUT 15 MG/L BOD AND 15 MG/L SUSPENDED SOLIDS. PLANT BEGAN OPERATION LATE 1980.
MOR? FINDINGS: NEW PLANT EASILY MEETS PERMIT LIMITS + HAS EXCESS CAPACITY.
E PUNP HOLDS ALL PEAK FLOW.
PAPRON
ISSUCS
PREDICTION:
PARRON.CITY OF 9ARRQN
WATFR QU«L/SU=tFACc
SL^FACt; MAT;? 'jHOULD IMPROVE; NC OIR.CT DISCHARGES.
SU?FAC" WiT.? JUALITY APPEARS TQ HAVE IMPROVED.
MI UPPER MISSISSIPPI
1980
30
CIRCHWJ30,VILLAGE OF
WA SH9URM
HI UPPER MISSISSIPPI
1982
31
fUSCHWQCD
ISSUE:
PPEOICTION: .?Y THI. TIM<:- vnsT~w4T?R CACHES GW, OBJECTIONABLE: COMPONENTS WILL BE REMOVED. NO AFFECT ON TOWN MATER.
• TWO MONITORING WFLLS ARQUNO SITE-GROUNDHATC-R QUALITY IS GOOD.
' N5W PLl.'JT EFFLUENT HAO AVG 300 A*»D TSS OF 47 ANO 25 MG/L, RESPECTIVELY.
PRE FINDINGS: OROUNlUtT-jR HA? HOT PE=H IMPACT:] BY DISCHARG:.
•liw PLANT'S 4V, OLMQVAL is SAMT AS OLD PLANT, «UT WITHOUT LARGE UPSETS.
BUTTERNUT
issuer
PREDICTION:
FIliOINGS:
MORF. FINDINGS!
vUTT;PIIUT,VILHr,E OB ASHLAND
WATER OUAL/SURrAC-:
WATtR QUALITY OF 9UTTERHUT CREEK AND LAKE WILL IMPFQVE.
EXISTING PLAMT DISCHAar.ES TO GROUND AT REMOTE SITi.
MI UPP5R MISSISSIPPI
1981
32
PLANT
Mf:
ITS »
AN? TSS LIMITS. PLANT EFFLUENT ADOS IMPQRT4NT AMTS OF INORGANICS TO GUNOMATER
NOT ALL S:<>T:C T«NKJ HOOKID UP. NO CONTROL ON AGRICULTURAL RUNOFF.
SURFACE MAT1R 1U4LITY HAS IHPROV'O CUE TO REMOVAL OF DIRECT DISCHARGE.
6UT PROBLEMS OF SEPTIC TANKS AN3 AGRICULTURAL RUNOFF HERE NOT AFFECTED BY PROJECT.
CORNELL
ISSUi:
PREDICTION:
FINDINGS:
CORNELL,CITY OF
MATER OU4L/GROUNO
CHIPPEMA
MI UPPER MISSISSIPPI
1983
33
TH-RE HAVti t>EEN NO P?PORTEO GROUNOWATER PROBL3MS ASSOCIATED WITH PLANT OPERATIONS OR SLUDGE DISP.
SLUDGF IS AM4LYZFD YEARLY AND IS APPLIFO IN ACCO^OSNCE WITH A STATE PROGRAM SETTING LOADING RATES,ETC.
HOP? FINDINGS: GROUNIIMATSR WAS HOT ADDRESSED IN THE PLANNING DOCUMENTS BUT ND PROBLEMS HAVE BEEN ENCOUNTERED
CORNELL
ISSUE:
PREDICTION:
FINDINGS:
CORNcLLoCITY OF CHIPPEMA MI UPPER MISSISSIPPI 1983 3*
MATiiR 3UAL/SU3FACE
CUNSTRUCTION WILL HAVE B-NEFICIAL IMPACT ON CLARK CRc = K.01SCH4RGE INTO CMIPPEWfl R MON°T AOVERSLV IMPAC
scuM.finoRj.tTJvnus POLLUTION IN CLARK CREEK ELIMINATED.PRESENT DISCHARGE TO CHIPPEMA RIVER GOOD.
>Pf«ATIIlG MrLt- MlTHtM PERMIT LIMITS 3F 30/?0.19B^ AVt 800= 20, S S= 16. l«0 AOVeRSE IMPACTS ON CHIPPEMA RIV.
-------
06AUC87
CITY
TO S^THR THAN PREDICTED
-------
r6AUr,87
CITY
PREDICTION:
AS Pr-EDtCT;0 TO BrTTER THAN PREDICTED
(PY »!VcR 6ASIN)
i'. p ANTE:
COUNTY
ST RIVED 8ASIN
NEPft(YR)
WiLL WfiTFR H&S NOT CHANGED.THgRE ARE N1 KNOWN POLLUTED WELLS.
MPF.: FINDINGS: no IMPACT TU GPOUND WATER HAS BEEN OBSERVED.
PLUM CITY
issue:
WI UPP:R MISSISSIPPI
1979
PLUM C:TY,VILLAGE OF PIERCE
UATLR
-------
06AUi;87
CITY
AS PREDICTED TO BETTER THAN PREDICTED
C3T °IVER BASIN)
GCANTEC. COUNTY
ST RIVER BASIN
NEPA(YR)
ST. L1UIS
ISSUE:
FINDINGS:
GRATIOT
ST. LOUIS, CITY OF
WATER JUAL/SURFAC:
"UHANS-D AMMONIA ANO PHJSPHO°US RE10VAL.
TiCRE HAS <•••:-•* SIGNIFICANT IMPROVEMENT IN THE AFFLUENT OISCMARGEO TO THE
PIN:
SAGINAW RIVER BASIN 1976
= FINDINGS:
CASS
ISSUE:
PREDICTION:
f i f n: .'i c. s:
" r HID INGS:
COUNTY WTP
TUSCOLA
HI SAGINAW RIVER BASIN 1977
R 'JUAL STANDARDS IN CASS RIVER UOULO 3E MET AS A R = SULT OF THIS PROJECT.
MUCH •''ETT.? TRFATMENT EFFICIF'iCY H4S RESULTED IN TH:
H:EVKM-| 103MG/L.
GLAOWMi.CITY
GL40WIN
MI SAGINAW RIVER BASIN 1976
49
aOO A dC S; liILL Br LESS THAN 30 MG/L. PHQ3PHURUS WILL ALSO SE REDUCED.
30D AKO Si i- .^MQVAL ARE EXCEEDING 9T? REMOVAL. TYPICALLY CONCENTRATIONS ARE LESS THAN 20 MG PER LITER
. MA"CH 199A: rFFLUdNTCMQNTHLY AVE.): 300 19MG/L, S5 21. NOV 198«»: EFFLUENTCHONTHLY AVE.): BOO 17MG/
L.
FINOINCS: "-'OD AliC SS P'MOVALS ARE MEETING DfSIGN PREDICTIONS PHOSPHORUS REMOVAL IS AT 60 TO 70X. THE PLANT IS
rHPLOVIilG THC USF OF FERRIC CHLQPIDe TO REDUCE PHOSPHORUS CONCENTRATIONS. THERE IS A REDUCTION OF 20
HOLLY
ISSUE:
PREDICTION:
FINDINGS:
OAKLAND
MI SAGINAW RIVER BASIN 1977
OAKLAND COUNTY OPW
WATcR OUAL/GROUdO
WATtR QU4L cNHANSEO: ELIMINATION OF IMPROPERLY TREATED SEPTIC TANK EFFLUENT.
WATCR '3UAL IMPPJViD. HOUSES ACJAC'NT T0 NTU' LINES MAVE HOOKF.O-UP,
THEREeY ELIPINITIOG ON-SITF
50
MOR: FinoiNGs: WATEP QUALITY IMPSOVED AS PREDICTEO AND POTENTIAL HEALTH RISKS REDUCED. PERCHED WATER TABLE AT LESS
THAN 10 FT. 15 TH; WATER SOURCE FOR INDIVIDUAL RESIDENCES IN HOLLY TOWNSHIP.
HOLLY
issur:
PREDICTION:
G4KLAMO COUNTY OPW
WATER gUAL/SUPFAC"
HATMFUL ALO'AL 5SOWTH IN THr
OAKLAND MI SAGINAU RIVER BASIN 1977
WILL BE oEDUCHOt AS WILL 8= TRU3IOITY.
51
-------
f6AUGS7
AS P(FDICTED TO BETTER THAN PREDICTED
OY RIVCR BASIN)
CITY GFANTPE COUNTY ST RIVER BASIN
FINDINGS: Cf'S:.RV4TIONS A?E A GREAT REDUCTION IN ALGAL GROWTH AND TURBIDITY IN TH£
TO 4 TO 5 MIL£S DOWNSTREAM CF PLANT OUTFALL.
NEPA(YR)
MORE FINDINGS!
HOWELL
ISSUE:
FItlOIHtSJ
LIVINGSTON
HI SAGINAW RIVER BASIN 19T6
HOWELL,CITY OF
WATER QUAL/GRGUND
cAUinr, S:PTIC TANKS WILL *£ REMOV'D, rLIMINATING POTENTIAL GROUND WATER IMPACTS
SEWIF LINF.S NOT BUILT. MO DOCUMENTED CASES OF WELL CONTAMINATION.
52
HCkE FINDINGS:
LAPEfR
ISSUE:
PPEPICTION:
FIUPINGS: •
LAPEER
SOUT« BRAtlCH Op THE FLINT
L6PE=«iCITY OF
WATER OUAL/jUR^AC;
AeAT-. POLLUTION Til TO
W*TtR QUALITY EIIHANCcD
AN" EXPANSION PROVIDE TERTIAPY TPEATM^NT.
MI SAGINAW RIVER BASIN 1976
53
MORF FINDINGS: SOUTH BRANCH JP FLINT RIV;P is a FULL CONTACT BOOY OF W»T?R. UPGRADE OF PLANT HAS ENHANCED WATER QUA
L:TY. in INFORMATION WITH PEGAPD TO BIOLOGICAL OF aguATic LIFE. EFFLUENT LOADINGS TO RECEIVING STREA
SAGINAW
R QUALITY.
TITTABAWASSF? THP T I TT A? AW A S3 f. '. TWP WHTP
ISSUE: UAT:? .iusL/i-"; :u; ALLEN
ISSUE: WETLANDS
PREDICTION: NU SEWERS -WILL be. CONSTRUCTED ON WETLANDS,COASTAL ZONES ,WILD AND SCENIC RIVERS OR OTHER AREAS
FINDINGS: NO CONSTRUCTION DON: ON WETLANDS.
56
S FINDINGS: THFPC WAS MC ciFFEPi-HCc IM PREDICTION VERSUS ACTUAL.NO OTHFR WETLAND PSRAMETERS EFFECTED
MC W-TLAMOS IN SCGPu AND A'tA QF CONSTRUCT ION.
-------
AS PREDICTED TO BETTER THAN PREDICTED
CITY GRANTEE COUNTY ST RIVER BASIN NEPACYR)
— — V — — — -. —.. — ———..»..»_......_———— —— ——————— — «-——•"— — ————«•"•——-•»—.»— —— — »..„._—,...___«._».»_» »_«•_•_•—*W »_»•••.*.«
HONROEVILLE MONROEVILLE,SWG DISPOSAL AUTH ALLEN IN MAUMEE RIVER BASIN 1980 57
ISSUE.: W^TLANOS
PREDICTION:
FINDINGS: NO KNOWN WETL«NOS IN AREA AFFECTED BY CONSTRUCTION.
MOPE FINDINGS: NO CHANGE IN WETLANdS.
ADA . ATA SEWAGE TREATMENT PLANT HARDIN OH MAUMEE RIVER BASIN 1976 58
ISSUE: WCTLANPi
PREDICTION:
FINDINGS: NO WFTLANCS WE
-------
C6AUG87 AS PREDICTED TO BETTER THAN PREDICTED
COY RrviiR BAS:N)
CITY GPANTE: COUNTY ST RIVER BASIN
MOR= FINDINGS: NO IMPACTS WERE PREDICTED OR IDENTIFIED FOR WETLANDS ISSUES.
NEPft(YR)
TCLEOC TOLEDO-WALB9ICGE WOOD OH MAUMEE RIVER BASIN 1980 63
ISSUE: WETLANDS
PREDICTION:
FINDINGS:
MORE FINDINGS: NO WETLANO? ISSUES ADDRESSED, NO IMPACTS FQUNO.
TOLEDO TOL=OO,CITY OF OAYVIEW) LUCAS OH MAUNEE RIVER BASIN 1980 6*
ISSUH: WETLANDS
PREDICTION: W^TLAHDS WILL NOT ^^^^^^^^ ^Bk^^^^^^^^^^^^^^^^^^^^aBBB ••••••••••••• •-«-••••••
UNIOPQLIS ! UNIQP^LISiVILLAGE ?JF • AUOLAIZE OH MAUME5 RIVER BASIN 1977 65
ISSUH: wffTLiiirs
PREDICTION: HO ENVIRONMENT SLLY S'-HS:TIV= AP>. AS :N PLANNING »R = a.
FlhOINGS: NO KNOWN IMPACTS HIVE OCCU»R?D.
MORF FINDINGS: NO IMPACTS EVIDENT
FUSHF09D RUSHPn?D,CITY OF FILLMOPE HN UPPcR MISSISSIPPI 1980 66
ISSU=: WiTLANOj
PREDICnflN:
FIUDI'IGS: NO APPAR = I|T IMPACT ON WETLAND. NO WETLANDS EVIDENT NEAP PLANT.
CONTINUOUS DISCHARGE IN HIGH HAT^R CONDITIONS COULD CONTRIBUTE TO WETLAND POTENTIONAL.
MORE FINDINGS: NO WETLAND? AF(=ECTCO BY NSW PLANT, ALTHOUGH CONTINUOUS DISCHARGE TO RIVER THROUGH DITCH COULD
POTENTIALLY CREATE MFW WETLAND CURING PERIODS OF HIGH WATER.
ALMA ALMA MUNICIPAL WASTEWATF.R TRMT PLT BUFFALO wi UPPER MISSISSIPPI ma 67
ISSUE: W2TLANOS
PREDICTION: TH=RE WILL a^ NO IMPACT AS THE FORCE MAIN AND OUTFALL SEWER WILL BE BUILT IN THE EXISTING RIGHT-OF-WAY
FINDINGS: NO IMPACT TO WETLANDS HAS OCCURRED.
MORE FINDINGS: NO IMPACT TO WCTLANOS 'IAS OCCURRED.
,«UGUST£ AUGUSTS,CITY'OF €AU CLAIRE WI UPPER MISSISSIPPI 1977 68
-------
CITY
ISSU;:
PREDICTION:
FINDINGS:
A3 PPEOTCTIO TO P'TTE" THAN PREDICTED
-------
06AUG67
cm
AS PREDICTED TO BETTER THAN PREDICTED
(tlY RIVER BASIN)
GRANTEE COUNTY
ST RIVER BASIN
NEPA(TR)
(IE SOTO o'SOTO,VILLAGE OF VERNON/CRAWFORO wi UPPER MISSISSIPPI 1978 7*
ISSL'i: WETLANDS
PREDICTION:
FINDINGS: PLANT NOT LOCATED IN WETLAND c NO ADDITIONAL FILL NEEDED FOR PLANT IMPROVEMENTS.
MOKE FINDINGS: PLANT NOT LOCATED IN WETLAND t NO WETLANDS AFFECTED BY PROJECT.
FOUNTAIN CITY FOUNTAIN CITYtCITY Oc BUFFALO MI UPPER MISSISSIPPI 1979 75
ISSUE: WETLANDS
PREDICTION:
FINDINGS: NO WETLANDS IN IMMEDIATE AREA.NO EFFECTS NOTED.
MORE FINDINGS: NO WETLANDS in THE IMMEDIATE AT-A.
PLUM CITY . PLUM CITY,VILLAGE OF PIERCE WI UPPER MISSISSIPPI 1979 76
ISSUE: i w:TLAh[)3
PREDICTION:
FINDINGS:
MORE FINDINGS: NO MHTLANCS W;R£ AFFECTLO BY THIS PSOJKT.
STRUM STRUM,VlLLAGc OF TR CMP'iAL': All WI UPPER MISSISSIPPI 198) 77
ISSU:: HCTLAflo;
PREDICTION:
FINDINGS:
MORE FINDINGS: '•.«..««.««. »•« — <. — —_»«>« — — .....«....• —-.» — — — —« — — — — ••» —— — — ^-••« — —•••^«
CASS SAGINAW COUNTY WTP TUSCOLA MI SAGINAW RIVER BASIN J977 79
IS5UE: WETLANDS
PREDICTION:
-------
P6AUG87
CITY
FINDINGS:
AS PREDICTED TO BETTER THAN PREDICTED
(BY RIVER BASIN)
&RANTEC
NO IMPACTS OBSERVED
COUNTf
ST RIV5R BASIN
NEPA(YR)
HORE FINDINGS:
HOLLY OAKLAND COUNTY OPW OAKLAND HI SAGINAW RIVER BASIN 197T 80
ISSUE: WETLANDS
PREDICTION: THERE MILL NOT BE ANY DEGRADATION OF WETLANDS.
FINDINGS: DEGRADATION OF WETLANDS DID NOT OCCUR.
MOFF. FINDINGS:
TITTAEAWASSEC "UP TITTARAWASSEE TUP UUTP SAGINAW HI SAGINAW RIVER BASIN 1979 81
ISSUE: WETLANDS
PREDICTION: TUT PLANT EXPANSION WILL NOT RESULT IN THE DESTRUCTION OF ANY WETLANDS.
FINDINGS: NO WETLAND IMPACTS RESULTED.
MORt FiriDINGS:
• • i
FOPT WAYNE FOPT WAYNE,CITY 3F (SEWERS) ALLEN IN HAUMEE RIVER BASIN 1980 82
ISSUE: FLOCDPLAINS
PREDICTION: A GRANT CONDITION TO ASSURE CONTINUATION AND ENFORCEHENT OF THE "NO BUILD" ORDINANCE ON THE FLOOOPLAIN
FINDINGS: NO CONSTRUCTION DONE ON FLOODPLAINS.
MPP.E FINDINGS: CONSTRUCTION THROUGH FLOODS A ItJS WOULD HAVE BEEN L?SS EXPENSIVE BUT LOCAL LAWS PROHIBIT THIS.
MONRCEVILLE MONROFVILLE,SWG DISPOSAL AuTH ALLEN IN MAUMEE RIVER BASIN 1980 93
ISSUE: FLOOPPLAINS
PREDICTION:
FINDINGS: THE FLCCOPLAIII HAS NOT CHANGED AT ALL DUE TO CONSTRUCTION.
ONLY SHALL A9'_A 1PQUND LAGOON IS SUSCEPTI9LE TO ADDITIONAL FLOODING BUT NO HAZARD TO PEOPLE EXISTS.
HORE FINDINGS: NO SIGNIFICANT CHANG? IN FLOOOPLAINS DUE TO CONSTRUCTION.
ADA ADA SEWAGE TREATMENT PLANT HAQDIN OH HAUHEE RIVER BASIN 1976 84
ISSUE: FLOOOPLAINS
PREDICTION:
FINDINGS: THE PREVIOUS PLANT WAS BUILT ABOVE THE FLOODPLAIN.EXPANSION is ALSO ABOVE FLOODPLAIN.
MORE FINDINGS: BOTH OLD
MEW TREATMENT FACILITIES ARE ABOVE THE FLOCDPLAIN.
-------
CITY
S Pr'EOICTiO TO BETTER THAN P?EDICT=0
-------
C6AUG87
AS PREDICTED TO BETTER THAU PREDICTED
(BY «IV£R BASIN)
CITY
MORE FINDINGS: PREDICTION WAS ACCURATE.
COUNTY
ST RIVER BASIN
NEPA
-------
C6AUG87
AS PREDICTED TC BETTER THAN PREDICTED
CiiY «:vrR RASIN)
CITY GRANTEE COUNTY ST RIVER BASIN
ISSUE: FLOOOPLAIUS
PREDICTION: THE FLOOD HAZARD .HILL *= ABATED DUE TO NEH LOCATION OF PLANT.
FINOIMGS: TH? PRESENT FACILITY IS LOCATED HELL ABOVE THE 100-YEAR FLOOD ELEVATION.
NEPACYR)
MOR= FINDINGS: TH? PROJECT DID MITIGATE THE FLOOD HAZARD.
AUGUSTA
. ISSUE:
: PREDICTION:
FINDINGS:
EAU CLAIRE
WI UPPER MISSISSIPPI 1977
AUGUSTA,CITY OF
FL'OOOPLAINS
ADDITIONAL UNITS HILL BE FLOOD PROTECTED TO 2 FT ABOVE REGIONAL FLOOD LEVEL OR LOCATED OUT OF FP.
PLANT is STILL LOCATED IN FLOODPLAIM.
EACH UNIT AT THE PLANT IS PROTECTED °Y CONCRETE CURBING.
THE PLANT SITt ITSELF IS NOT PROTECTED BY A DIRE.
MORS FINDINGS: THE PLANT UNTTS ARS PROT-CTEO BY CURRING BUT COULD STILL BE THREATENED BY FLOODMATERS.
BANGOR
ISSUE:
PREDICTION:
FINDINGS:
HI UPPER MISSISSIPPI
1978
•VILLAGE OF LACROSSE
cLOQr>PLAINS
NO DrTSIMENTAL EFFECT ON OR BY FLOODPLAIN
SOME ADDITIONAL FILL REQUIRED TO PROVIDE SPACE FOR ALL NEH FACILITIES.
PLANT SITE A30V£ REGIONAL FLOOD ELEVATION. ACCESS FROM ROAD GRADE ALSO ABOVE REGIONAL FLOOD.
98
MORE FINDINGS* PLANT LOCATED ON ELEVATED SITE OF OLD PLANT AND LOG PILE. SOME ADDITIONAL FILL HAS REQUIRED. BUT NO EV
1 ID=NCE THAT IT RAISED FLOOD EL?V-»TION. PLANT MORE THAN Z FEET ABOVE REGIONAL FLOOO.
BARRON fARRON.ClTY QF BARPON
ISSUE: FLOODPLAIliS
PREDICTION:
FINDINGS: PIVER CHANMLL NOT AFFECTED PY PIPI CROSSINGS.
PLANT LCCAT.O OUTSIDE OF CLOOPPL»IM.
HI UPPER MISSISSIPPI
1980
99
MOPE FINDINGS: NO IMPUT ON FLOOOPLAIN.
PIRCHUOOD
ISSUE:
PREDICTION:
FINDINGS:
BIRCHUOOOtVILLAGE CF
FLOODPLAINS
SITE NOT IN A FLOOOPLAIN
SITE LOCATED HIGHER THAN OLD PLANT.
UASHBURN
HI UPPER MISSISSIPPI
1982
100
MOPE FINDINGS: APOVE OLD PLANT, NO EFCECT ON FLOODPLAIN.
6RUCF
ISSUE:
PREDICTIONS
FINDINGS:
RUSK
HI UPPER MISSISSIPPI
1980
101
KRL'C :,VILLAGE Of
FL10CPLAINS
FACILITY IN FLOODPLAIN,BERMS HILL HAVE 2 FT MINIMUM CLEARANCE ABOVE 100 YEAR FLOOO ELEVATION
MARSHLAND AtlO ACCESS ROAO TO SITE UtRE FLOODED IN OCTOBER 1985 BUT MATERS DID NOT REACH LAGOON BERMS.
CCPM? WPPE EL;VAT£0 3 FT HIGHER THAN OLD PERMS TO PROTECT AGAINST 100 YR FLOOD ELEVATION AS PLANNED.
MORE FINDINGS: NEW SITE is SMALLER THSN OLD LAGOONS, THEREBY IMPACTING FLOOD FLOM LESS THAN BEFORE
-------
C68UG87
CITY
5 PREDICTED TO BETTER THAN PREDICTED
(3Y PIV..R BASIN)
GPANTEi COUNTY
ST RIVER BASIN
NEPA(VR)
BUTTERNUT
ISSUE:
PREDICTION:
FlhDIN&S:
MORf CIMOINGS!
ASHLANO
WI UPPER MISSISSIPPI 1981
BUTTHPHUT,VILLAGE OF
FLOCOPLAINS
EXISTING PONOS HILL Be RAISED. THIS ACTION WILL CAUSE NO CHANGE IN FLOOD PROFILE
POND DIKES RAISED TO ABOVE FLCOOWAY ELEV.
OPCRATDRS 010 NOT INDICATE ANY PROBLEMS FROM FLOODS.
SURROUNDING AR=A NORTH OF CREEK IS LOWER THAN PONOSt BRIDGE OVER CREEK RESTRICTS FLOODPLAIN
PONDS PROTECTED FROM FLOODS. PROJECT DOES NOT IMPACT FLOOOWAY
102
COPNHLL
ISSUE:
PREDICTION:
FINDINGS:
MORE FINDINGS:
CHIPPEWA
WI UPPER MISSISSIPPI
1980
103
COFNELL.CITY OF
FLOODPLAIUS
NO IMPACTS ON FLOOD ELEVATIONS IN CHIPPEWA EXPECTED.OUTFALL CONSTRUCTION IMPACTS WILL BE RESTOREOtETC,
TH= PL*llT IS LOCATED OUT OF THE FLOODPLAIN AND HAS HAO NO FLOODING PROBLEMS.
CONSTRUCTION OF THE OUTFALL HAS HAO NO ADVERSE IMPACT ON THE FLOOOPLAIN.
TH5(?E IS 4 SUFFICIENT CHANGE IN ELEVATION TO PREVENT BACKFLOW PROBLEMS DURING HIGHWATERS
TH = PLAliT HJS HAD NO IMPACT ON THE FL01PPLAIN AND TS REMOVED FROM FLOODING PROBLEMS
CUMBERLAND
ISSUE:
PREDICTION:
FINDINGS:
CUMB :?L
FLOOPPLAINS
, FLOW WILL IN
NO t(OTICEA«L
AN
CF
O.CITY DF
=A?= TO HAY
U:C»FiS£ IN
8ARRCN
RIVER.
RIV3R F4.0W.
WI UPPER MISSISSIPPI 1978
10*
M3RF FlflDTNCS:
VHRNON/CRAMFORD
WI UPPER MISSISSIPPI 197*
105
DE SOTO 0=SOTO,VILLAGE OF
ISSUE: FLOOOPLAINS
PREDICTION: PLANT :XPAN:ION «AV PEOUIRF AODITIQNAL FILL
FItlClMGS: PL«HT FLEV4TION 633. HtGIOHAL FLOOD =LfVATION AT 634.5. ALL EXCAVATION AT SITE ABOVE FLOOD LEVEL.
NO N::W FILL HAO TO a? us'o IN BUILDING ii=w PHUT.
MORE FINDINGS: NO ADDITIONAL PILL RPQUIREO AT EXISTING SITE TO BUILO "es. ALL FACILITIES WELL ABOVE 10: YR FLOOD LINE
OLD FILL PLACID III 1966 WAS SUFFICIENT.
FOUNTAIN CTTY
ISSUE:
PREDICTION:
FINDINGS:
3UFFALO
WI UPPER MISSISSIPPI
1979
106
FOUNTAIN CITY,CITY OF
PLOOOPLAIMS
CONTROL «UILOIMG MUST BC PROTECTED TO z« ABOVE FLOPO LEVEL.NEW UNITS WILL BE CONSTRUCTED AT THIS ELEV,
NEW CONSTRUCTION IS WITHIN THc FLOODPLAIN. HI OTMfR 34SIC FOR COMPARISON.
FLOOD SAF2GUA30S A": IN PLACE: NtA^BY RAILPOAO 9;RM PROTECTS PLANT tA PLUG PREVENTS BACKFLOW
9ACKFLOW THPOUGH TM£ OUTFALL PIP=.
MORE FINOINCS: FLOOD PROTECTION IS IN PLACE FOtf FACILITIES IN FLOODPLAIN.
PHILLIPS
ISSUE:
PREDICTION:
PRICE
WI UPPER MISSISSIPPI
1980
107
PHILLIPS,CITY OF
FLOODPLAINi
PART OF TH: SITE WILL REQUIRE FILLING ABHVE 100-YR FLOOOPLAIN. NO OISCERNABLE EFFECT ON 100-YR FLOOD •%
-------
06AUG87 AS PREDICTED TO BETTER THAN PREDICTED
(Of PIVER BASIN)
CITY GRANTED COUNTY
FINDINGS: NO EVIDtNCr OF FLOODING IMPACTS AT SIT = OR NEARBY.
ST RIVcR BASIN
NEPA(YR)
? PINOINGS: FLOODMAY NOT AFFECTED
PLUM CITY PLUM CITY,VILLAGE OF PIERCE WI UPPER MISSISSIPPI 1979 108
ISSUE: FLOODPLAINS
PREDICTION:
FINDINGS:
MORE FINDINGS: TH= PLANT is .LOCATED ON THE ORIGINAL SITE. ABOVE THE FLOOOPLAIN.
ST. LOUIS ST. LOUIS, CITY OF GR4TIOT MI SAGINAU RIVER BASIN 1976 109
ISSUE: FLOOPPLAIHS
PREDICTION:
FINDINGS: NO ADVERSE :FF=CTS HAVE OCCURRED.
MOPE .FINDINGS?
i
CAS5 3AGIN&M COUNTY WTP TUSCOLA HI SAGINAU RIVER BASIN 1977 110
ISSUE: FLOOOPLAINS
PREDICTION:
FINDINGS: NO IMPACTS IDENTIFIED.
MORE FINDINGS:
DURAND DURAND.CITV OF SHIAUASSE: MI SAGINAM RIVER BASIN 1976 ill
ISSUE! FLOODPLAIhS
PREDICTION:
FINDINGS: PLANT IS A80V. 100 YEAR FLOOD LINE.
MORF FINDINGS:
HOLLY CAKLANO COUNTY OPU OAKLAND MI SAGINAU RIVER BASIN 1977 112
ISSUE: FLOODPLilNS
PREDICTION:
FINDINGS: ALL NEW CONSTRUCTION W43 OUTSITE THE 10C-YR FLOOD LIMITS.
MORE FINDINGS:
-------
06AUG87
AS PREDICTED TO BETTER THAN PREDICTED
(SY RIVER BASIN)
CITY GRANTEt COUNTY ST RIVER BASIN NEPA(VR)
* — — — ...— —-.— • — -.._._.«._._.._«»..._„..,.„._.„— — — —.— — .. — — — — — — — — — •«• — —•— — —— — — — — — »—.» — ..—.— — — -..-.»•»•—•—» _..._ _..__H»_.._B.WV__*I>
HOWELL HPMELL.CITY OF LIVINGSTON HI SAGINAW RIVER BASIN 1976 113
ISSUE: FLODOPLAINS
PPEDICTION:
FINDINGS: REDUCED RISK OF FLOODING OCCURRED AS A RESULT OF CHANNELIZATION.
MORE FINDINGS:
LAPEER LAPEER.CITY OF LAPEER MI SAGINAM RIVER BASIN 1976 11*
ISSUE: FLoaopLAtns
PPEOICTIOU:
FINDINGS: AS A RrSULT OF PLANT EXPANSION A NEW HIGH FLOW CHANNEL FOR
THC SOUTH UFANCH OF THE FLINT RIVER WAS CONSTRUCTED ON
Thu OPPQSITC B4HK OF THC. RIVSR.
HOPE FINDINGS:
TITTABAWASScE TUP TITTABAWASSE£ TWP WWTP SA&INAW HI SAGINAW RIVER BASIN 1979 115
ISSUE: FL030PLAINS
PREDICTION:
FINDINGS: . FACILITY is NOT LOCATED IN THE IPC YEAR FLOODPLAIN.
MOPE FINDINGS:
FORT MAYNE FCRT W£Y!I=.,CITY OF (S = W3RS) ALLEN IN MAUMEE RIVER BASIN 1980 116
ISSUE: e,;oTA/tQuiTiC
PREDICTION:
FINDINGS: TH?;R: APP^KS TO BT AN ENVIRONMCNTALLY SOUND HABITAT IN T.HE AREA.
MOFF FINOTNGS: GAML FISH (AVi 35':N FOUND IN HDUTH OF MAUMEE RIVER WHICH IS ATTRIBUTED TO THIS CONSTRUCTION GRANT
AND A GRANT TO UPGRADE TH£ FORT WAYNE WATER TREATMENT PLANT.
FORT W6YN£ FORT WAYIJ-.CITY Of CS5WERS) ULLcN IN MAUMEE RIVER BASIN I960 117
ISSUE: BIOTA/RAR:ttNO.THR
PREDICTION:
FINDINGS: THERE ARE NO ENDANGERED SPECIES IMPACTED BY CONSTRUCTION.
HOR!! FINDINGS: NO NOTICEABLE EFFECT ON ANY ENDANGERED SPECIES FOUND.
FORT WAYNE FORT WAYN-?,CITY OF (SEWFRS) ALLEN IN MAUMEE RIVER BASIN 1983 118
ISSUE: PIOTA/T^R
PREDICTION:
FINDINGS! THSRE APPEARS TO 8E AN ENVIRONMENTALLY SOUND HABITAT IN THE AREA.
-------
06AUG87
AS PREDICTED TO BETTER THAN PREDICTED
C3Y RIVER BASIN)
CITY GRANTEE COUNTY ST RIVER BASIN NEPA(VR)
MORE FINDINGS: NO HOTICEA«L? OIGRADATTCN OF TERRESTRIAL LIFE WAS FOUND OR DOCUMENTED ACCORDING TO MR.EMBURY OR MYSELF
HONROEVILLE
issue:
PREDICTION:
FINDINGS:
MON30EVILLE.SWG DISPOSAL AUTH
ALLEH
IN MAUMEE RIVER BASIN 1980
119
IMPROVE WATLR JUALITY OF THE MAUMEE RIVER.
A NEW HABITAT rXISTS FOR AQUATIC LIFE INCLUDING FISH IN THE NEW LAGOONS.
NO'SIGNIFICANT CHANGE IN MAUMcr RIVER AUUATIC LIFE BECAUSE OF THIS GRANT.
MORE FINDINGS: MAUM.FC F.IV^R AQUATIC LIFE DID NOT IMPROVE SIGNIFICANTLY BUT CONSTRUCTION OF THE LAGOON SYSTEM AND
STOCKING TH~ UATTR WITH FISH HAS AOJED HEALTHY AQUATIC HABITAT IN MONROEVILLE AREA.
KONPCrVILLE
ISSUE:
PREDICTION:
FINDINGS:
ALLEN IN MAUSEE RIVER BASIN 19BO 120
NO ENDfttiGERiO SPECIES HAVE ENTERED THE AREA OR BECOME ENDANGERED BECAUSE OF THIS CONSTRUCTION.
MQNROrVlLLE ,SWIi DISPOSAL AuTH
HIOTA^PAP-I.LND.THP
MOKE FINDINGS: NU CHANG? T0 ^NOAfJGERED SPECIES BECAUS" NONE PRESENT IN AREA.
ADA
ISSUE:
PREDICTION:
FINDINGS:
A?A 3:HA»T TREATMENT PLANT
HARD IN
OH MAUSEE RIVER BASIN 1976
MOTA
IMPROVED WATER QUALITY WILL RESULT IN IMPROVED WILDLIFE HABITAT
NO IMPACT WAS NOTCO ON LOCAL CPTPS OR WILD VEGETATION.
SOMt iMALL FISH HAV£ RETURNED TO GRASS «?UN CREEK.
MORE FINDINGS: NO IMPACTS
PREDICTED OR NOTED.
CR:D:PSVILL=,VILLAGE TF
AUGLIAIZE
OH MAUMEE RIVER BASIN 1977
122
CRIDHRSVILLE
ISSUE: BIOTi
PREDICTION: STREAM WILL PROVIDE SPAWNINGO HABITAT FOR SMALL FISH. NO EFFECT ON OTHER WILDLIFE,EXCEPT MAYBE RABBITS
FINDINGS: FISH HAVE ^TURNED TO STREAM - MINNOWS. BLUEGILLS, TURTLES.
MORE FINDINGS: FISH HAVE RFTURNED TO STREAM
HARROD
ISSUE:
PREDICTION:
FINDINGS:
H4R300,VILLAGE OF ALLEN
BIOTA
PLANT WILL BE BUILT ON SIT5 PREVIOUSLY USED AS WOODLAND.
MINNOWS HAVc R=TURN=D TO THH STRtAM.
19 ACR^S OF LAND PURCHASED. 5 ACRES OF WOODLAND USED FOR CONSTRUCTION.
OH MAUSEE RIVER BASIN 1977
123
MORE FINDINGS: MINNOWS HAVE 9EtN SEEN IN STREAM.
PLANT CONSTRUCTION ON PREVIOUS WOODLAND SITS.
KALIDA
OF
PUT*|AM
OH MAUM5E RIVER BASIN 1976
124
-------
P6AUG87 AS PREDICTED TO SETTER THAN PREDICTED
Or S'VrrR «ASIN)
CITY GtiANTcd COUNTY
ISSUE: "I3TA/SOUATIC
PREDICTION: SHORT TLRM EFFECTS ON PLUM CREEK BIOTA DUE TO CONSTRUCTION.
FINDINGS: CPEEK APPEARS CLEAR-NO LONG-TERM IMPACTS NOTED.
ST RIVER BASIN
NEPA(YR)
MORF FINDINGS: NO LONG-TERM IMPACTS FROM CONSTRUCTION HERE NOTED.
MONTPELIEP MONTPELIER SWG TRT PLT WILLIAMS OH MAUMEE RIVER BASIN 1980 125
ISSUE: BIOTA
PREDICTION: INDUCED DEVELOPMENT MAY RESULT IN THE DESTRUCTION OF POTENTIAL WILDLIFE HABITAT
FINDINGS: THERE Af:F APPARENTLY NO DESTROYED WILOLIFE HABITATS DUE TO THE CONSTRUCTION PROJECT.
CY FRINGING 4 SEPARATE HOSPITAL TREAT. SYS. ON-LINE TO WWTPt AREA STREAM HOLLUSK LIFE HAS IMPROVED.
NU DEVELOPMENT HAS OCCURRED WHICH HAS AFFECTED WILDLIFE
v FINDINGS: NO WILDLIFE 0:STROY ED,INCORP. OF SFPAR4TE DISCHARGERS T9 WWTP HAS IMPROVED SOME SPECIES POPULATIONS.
SLTSEUUfNT MINOR DEVELOPMENT HAS NOT AFFECTED WILDLIFE
NAPOLEON
ISSUE:
PREDICTION:
FINPINGS:
NflPOL-L/N
HCHRY
OH MAUMEE PIVER BASIN 1977
126
MORE FINDINGS: NO r»cD;CTutts WERT MHO?
AQUATIC OP TERRESTRIAL BIOLOGIE S.NO IMPACTS TO AQUATIC OR
TERPESTPIAL WILOLIFH HAS 3E£.N NOTED.
OH MAUMEE RIVER BASIN 1376
127
RIDG»:VILLE CORNERS H = liRY COUNT Y( "IDGEVILLE COPHERS) H^NRY
ISSUE: ?:OTA
PREDICTIOH: TH: P;OPO;;D JCTICN WILL HAVE SOM: BENEFICIAL EFFECT ON AQUATIC BIOTA & HABITAT
FINPIMGS: THFR= AFE NO CUPPHNT P^DPLEMS WITH THE HABITAT.
THERE AR= GL-^O LU^REUT BIOTA MONITORING «:COROS(T:FFIN PIVER)-THOUG i NO ACTUAL MONITORING OF DITCHES
ThC ir-'A WHlrr. COIlSTPUCTION ACTIVITf CCCURfLO W4S t IS WO.T A PACTICULAR WILDLIFE HABITAT
MOKE FINDINGS: THOUGH CUK?-NT RTCORCJ API COCO, THE«!E IS NO REAL HONI TQtf ING DATA TO COMPARE PREVIOUS t CURRENT BIOTA
WITH THL IMP?QVE3 TR E A TM.T ^4T , IT IS LIKELY THAT LESS SEVERE DISCHARGES HAVE HAD A BENEFICIAL EFFECT.
TOLEDO
ISSUE:
PPEDICTION:
FINDINGS:
TOLFDO-WAL&RIOGF WOOD
1 1 0 T A
PROJCCT WILL PRLVIDc AN ENVIRONMENT CONDUCIVE TO NATURAL
NO FLL"A OP MUNA WAS IMPACTED.
OH MAUMEE RIVER BASIN 198
BIOTA.
128
MCRF FINDINGS: STREAM IMPACTS HERE BENEFICIAL ^NC WITHIN THE MAGNITUDE EXPECTED.
UNIOPOLIS
ISSUE:
PREDICTION:
FINDINGS:
UM:OPOLTS.VILLAGE CF
PIOTA
AQUATIC ECOLOGY SHOULD
NO IMPACTS EVIDENT
AUGLAIZE
OH MAUMEE RIVER BASIN 1977
129
MORE FINDINGS: no IMPACTS ;.V:OENT
-------
06AUG87
CITY
AS PREDICTED TO BETTER THAN PREDICTED
(?Y RIVE.R BASIN)
GRANTS COUNTY
ST RIVER BASIN
NEPA(YR)
UESTON
ISSUE:
PREDICTION:
FINDINGS:
W'STON,VILLAGE OF WOOD OH MAUMEE RIVER BASIN 1979
BICTA
THE PCCJECT MILL NOT IMPACT ENDANGERED SPECIES.
THERE ARE NO KNOWN PROBLEMS WITH ANY OF THE PLANT/ANIMAL LIFE WITHIN THE PLANNING AREA.
130
MORE FINDINGS: PREDICTION HAS ACCURATE.
RUSHFCRD PUSHFCFIO.CITY OF FILLMOPE MN UPPER MISSISSIPPI
ISSUE: BIOTA
PREDICTION: NO IMFICT is EXPECTED ON ENDANGERED SPECIES OR SENSITIVE ENVIRONMENT AREAS.
FINDINGS: FLORA NEAP OUTFALL SEEM STABLE. AREA HAS ESEN USED AS TRASH DUMP IN PAST.
PLANT siTf: GRASS/ASPHALT. AREA NEAR OUTFALL MOSTLY WEEDS.
MORE FINDINGS: HC APP8F.ENT CHANGES
1980
131
ALMA
ISSUE:
PREDICTION:
FINDINGS:
ALMA MUNICIPAL WASTSWATFR TRMT PLT BUFFALO wi UPPER MISSISSIPPI
BIOTA
SOME TPcES ANO VEGETATION WILL 9fi: REMOVED: NO ENDANGERED SPECIES AR= INVOLVED.
S3M; VtGFiTaTIOfl WAS RIHOVcD.
NU EUDAUGERtO SPFCI6S WERE INVOLVED.
1980
132
MORE FINDINGS: TH= ACTUAL IMPSCTS WERE *s PREDICTED.
AUGUSTA
ISSUE:
PREDICTION:
FINDINGS:
WI UPPER MISSISSIPPI
1977
AUGUSTA,CITY OF EAU CLAI°>;
BIOTA
NO SIGNIFICANT WILDLIFE WILL 3E AFFECT'O BY Til? PROJECT.
NO HABITAT WAS AFFECTED BY THE PLAMT EXPAHSION.FISHING AND TRAPPING HAVE IMPROVED.
FISH PPESJNTLY CAUGHT DOWNSTREAM DO NOT HAVE A FILM ON THEIR SCALES, TASTE BETTER WHEN COOKED.
SOME CHANGS IN AQUATIC PLANT 3PECIES.MOPE DIVERSITY.
133
MOR* FINDINGS: NO HABITAT was DISTUR9 = 0.STR = AM IMPROVEMENT HAS RESULTED IN HEALTHIER AND MORE ABUNDANT WILDLIFE.
BANGOR
ISSUE:
PREDICTION:
FINDINGS:
RAIiGO", VILLAGE CF LACROSSE WI UPPER MISSISSIPPI 1978 13*
«IGT A
NATIVE VEGETATION A$ WELL AS ANY ANIMAL HABITAT ASSOCIATED WITH THE SITE WILL
DUTCH CREEK STILL CLASS III TROUT STREAM. NO OTH€R CHANGES IN BI3TA NOTED.
BE LOST. MITIGATION
MORE BINDINGS: NO SIGNIFICANT CHANGFS IN BIOTA NOTED BY INFORMANTS. APEA NEAR PLANT is BANGOR PUBLIC HUNTING GROUND.
TROUT FISH?KY "tPORTEO "OK"
BARRON
ISSUE,:
PRFDICTIQn:
8IOTA.
HARRQN.CITY OF
BARRON
WI UPPER MISSISSIPPI 1980
135
"RELOCATION OF SMALL GAME, m BALD E'AGLE >?ESTS IN CONSTRUCTION ARE*'
-------
P66UG87
CITY
FINDINGS:
AS PREDICTED TO SETTER THAU PREDICTED
1V.;P 8ASIN)
GPiHT=£ COUNTY ST RIVER BASIN
SITt AND NCA"R3Y WOODS US^O BY BIRDSo SMALL ANIMALS AND OEcR FOR MATER AND FOOD.
NEPA(VR)
? FINDINGS: PLMJT HAS a POSITIVE IMPACT ON ANIMAL AND BIRD LIFE.
e:eCHWOOO,VILLAGE CF WASHBURN WI UPPER MISSISSIPPI 1982 136
ISSUE: 8ICTA
PREDICTION: NO KNOWN RARE SPECIES OF PLANT OR ANIMAL LIFE. VEGETATIONAL DAMAGE WILL BE CORRECTED AFTER CONSTRUC
FINDINGS: VARIOUS SPECIES OF BIROS AND ANIMALS USE SITE FOP FEED ANO WATER.
D Af^aS HAVE BtcN R
MORF FINDINGS: NO NEGATIVE IMPACT ON BIOTA.
ISSUE:
PREDICTION:
FINDINGS:
::,VILLAGE OF RUSK WI UPPER MISSISSIPPI 1983 137
3IOTA/TLR
WILDLIFt WILL NOT ES SIGNIFICANTLY AFFcCTtO.NG ENOANGEREO SPECIES,MINIMAL DISTURBANCE TO VEGETATION
4R»A (.>:STu&;'"D UURING CONSTRUCTION WAS RESEEDF.O, SHOWED NO SIGNS OF CONSTRUCTION DISTURBANCE.
OcFF CCC4SlnNALLY SE:N IN OF^N HARSH AND WATERFOWL LAND AT SITE.
HOP; FINDINGS: SITE is SURROUNDED BY LARGER TRACTS OF UNDISTURBED LAND, MINIMALLY IMPACTS BIOTA
CORNELL
ISSUE:
PREDICTION:
FINDINGS:
MORE FINDINGS:
CPPNcLL.C ITY OF CHIPPEWA WI UPPER MISSISSIPPI 198C 138
OIOTA
NC ENDANGERED ?P-CI=S IN ROUTE OF OUTFALL EXTENSION. FOREST t OPEN SPACE MAYBE LOST FROM EXPECT GROWTH
CONSTPUCTION OCCURRED AT EXISTING PLANT SO NO ADVERSE IMPACTS ON BIOTA.
OUTFALL CONSTRUCTION HAD NO LONG TERM IMPACTS AND IS REVEGETATEO.
THERE HAS NCT BEEN ANY LOSS OF OPEN SPACE CR WOGO:D AREAS AS A RESULT OF PLANT EXPANSION
THtRE HE*;. NO CFF£CTS ON 3IOTA AS THE EXPANSION nCCUD^FD AT THE EXISTING, CLEARED SITE
A LOSS OF OPEN SPACE HAS NOT RESULTED AS OF THIS POINT IN TIME
CUMOCPLANO
ISSU;:
PREDICTION:
FINDINGS:
CUMB^LANO.CITY OF
BA9RON
WI UPPER MISSISSIPPI
SOME WILDLIFE WILL 6E TEMPORARILY DISPLACED OR FORCED TO RELOCATE.
VILDLI^c NTT J°SERV;0. SITt LOOKCD SUITA3L; FOR SMALL ANIMALS AND WETLAND BIOTA.
1978
139
MflRS FItlOINGS: SITC APP:A"S SUITABLE FOR VARIOUS WILDLIFE.
DE SOTO
ISSUE:
PREDICTION:
FINDINGS:
VILLAGE CF V= RN3N/CPAWFORO WI UPP=R MISSISSIPPI 1978 1*0
3IPTA
"CMOVAL OF STM^ GRASS ANO BRUSH ADJACENT TO EXISTING FACILITY.
NO HEW LAIJO WAS NEEDED FOR PLANT EXPANSION. MUCH OF OLD FILL AREA STILL GRASS I BRUSH.
niSMTfJG IN SUMMER NiAR PLANT OUTFALL. MUSK RAT IN PLANT VICINITY. MAY FLIF.S 8AO BECAUSE OF HIGH WQ.
MORE FINDINGS: NO NOTED ITICT ON SIOTA IN VICINITY OF PLANT
-------
C6AUG87
CITY
AS PREDICTED TO SETTER THAN PREDICTED
rllfiOS FR'QU'tNTLY U£F THE SITE FOR WATER FEEDING.
WI UPPER MISSISSIPPI
1980
146
RELOCATION OF SOME SPECIES
-------
AS
O TP BETT=K THAN PREDICTED
,5 Y P I V •; R BASIN)
CITY Gf.'AMTE,.
MORE FINDINGS: SITE HAS
COUNTY
sr HABITAT OF SDH? SPECIES
ST RIVER BASIN
NEPA(YR)
STRUM STMJM.VILLAGE OF TREHPEALEAU HI UPPER MISSISSIPPI 198D 147
ISSUF: BICTA/t^UATIC
PREDICTION: THERE WILL DE A FAVORABLE IHPACT ON THE QUALITY OF THE AJUATIC HABITAT
FINDINGS: FAVOPA8LE U'PACT ON AQUATIC HABITAT CONFIRMED.
MOPF FINDINGS: NO UHPRIOICT10 IMPACT HAS OCCURRED BUT IMPROVEMENTS NOT NOTED.
WESTflY H:3Try STUAO? TRfATMcNT PL6NT VC?NON VI UPPcR MISSISSIPPI 1979 148
ISSUE: flHTA
PRIDICTION: WILL HCT SIGNIFICANTLY AFFECT ANY PERENNIAL STREAM QUALITY OR FISH AND AQUATIC HABITAT.
C'-'F t PAr,n:TS ,,OT 3EcN TNSIO;; PLAHT F5MCF..NO CHAMOt IN FISH NOTED.
r Finoinr-s: NO APPARENT CHidCE IN PIQTA OUTSIDE PLANT PENC^ ?UT SOME ANIMALS LIVE IN YEAR AROUND MVD NEAR OUTFALL.
ST. LOUIS ST. LDUISt CITY CF • GRATIOT Ml SAGINAW RIVER BASIN 1976 149 :
ISSUE: eioTA
PRtDlCTION:
FINDINGS: uo AOV:RS :PF-.CTS HAV; occu"p':D.
MCRE FINDINGS:
CASS iiOI'ISW CQU'.TV WTP TUSCOL& MI SAGINAW RIVER BASIN 1977 150
ISSUE: eim*
PREDICTION:
FINDINGS: U3 IMPACTS CCCURPlfO
• MORE FINDINGS:
DUPANC- LURANOiCITY OF SHIAWASS^ MI SAGINAW RIVER BASIN 1976 151
ISSUE: BIOTA
PREDICTION: AOUATIC AMD EIOLOGICAL LIFE ENHANCED BY PROJECT.
FINDINGS: NO QUANTITATIVE INFQPMBTIQN AVAILAeLc. HOWEVfRt PLANT PERSONNEL HAVE NOTICED TWO SPECIES OF BIRDS NO
T sE^n PRIOH TO PLANT UPGRADE.
MORE FINDINGS : TH= CISCHARGr Dr'AIN WAS CHANGED FRQM Trii HOLLY DRAIN TO THE SHIAWASSEE RIVER WHEN THE PLANT WAS UPGR
AD?D. KINGF:S.
-------
96AUG37 AS PFEOICTijO TC cETTcR THAN PREDICTED
C'Y ^;v;:? PASI4)
CITY G^ANTFf COUNTY ST RIVER BASIN NEPA(YR)
ISSUE: PIOTA
PREDICTION: THE PK?JCCI WILL NDT AFFECT WILDLIFE OR ENDANGERED SPfCiESi NOR CAUSE NUISANCE I
IHGS: yacLiFi rr.T AFFECTED AND NO NUISANCE INSECT PROBLEMS HAVE BEEN RELATED TO THE w
FINDINGS:
LAPEFF LAPEE°,CITY OF LAPEFR MI SAGINAW RIVER BASIN 1976 153
ISSUE: BIOTA
PREDICTION: WILDLIFE WILL NOT BE AFFECTED ANO WILL R-MAIN IN ITS ORIGINAL CONDITION.
NC IMPACT TO WILDLIFE NOTED.
FINDINGS:
JASSEF TWP T!TTA°AW4SSE.: TWP WWT? SAGINAW MI SAGINAW RIVcR BASIN 1979
ISSU£:. 'ICTA
PREDICTION: *ic U?;:UUE c-^MUNITIES, HABITATS OR OTHT? FACTJRS WILL s; SIGNIFICANTLY AFFECTED
FINDINGS: . THT PLSHT n:n NLT P^SULT in ANY ACVERS- IMPACTS TO
MOPE FINDINGS:
FORT WAYNE F2PT W^vnc.CITY OF (ScweKS) ALLEN IN MAUMEE RIVER BASIN 1983 155
ISSUE: soc:o/enPL:>Y
PPEDICTIONS TH2 PF.lJf-CT WILL HOT SIGNIFICANTLY IMPACT LONG-T'PM EMPLOYMENT IN THE PLANNING ARfcA.
FINDINGS: -MPLCYM.'IT HIS D'COLASED SOMEWHAT OVER THE PAST t> Y;»RS 8UT IT HAS NOT BEEN BECAUSE OF THE GRANT.
MORE FINDINGS: THIS G?ANT H»3 LITTLE OK NO IMPACT ON THPLOYMENT III THE SERVICE AREA.
FORT WAYNE FORT W,\Vi|-,CITy OF (SC.WFKS) ALLEN IN MAUMEc RIVER BASIN 1980 156
ISSUE: SOCIC/'LANOUJ:
PREDICTION: NO CONVERSION IF AGRICULTURAL L^ND TO ?:S:OF.NT!AL us" is ANTICIPATED.
IGS: NO ADDITIONAL 'ESICENTIAL AR'AS W=Si- C QNVH »T ED FfGM cARHLAND BECAUSE OF SF.WER GRANT.
MOF.- FIMOInC-s: THr PP'DICTION THAT FARMLAND WOULD NOT BE CONVERTED TO RESIDENTIAL USE WAS CORRECT.
FORT WAYNE FPP.T UAVMF.CITY OF (SEWHRS) ALLEfl IN MAUMEE RIVER BASIN 1980 157
ISSUE: SOCIC/LANDU5:
PREDICTIONS THC COMMIT^INT JF LAND WILL B:. MINIMAL SINCE THE PPOJ1CT INVOLVES ONLY THE RIGHTS-OF-W AY.
FINDINGS: THcRE W^R; fH CHANGES FR1H THE It.jITIAL PROJECTIONS SO NO LAND HAS USED THAT WAS NOT PREDICTED.
' MOR? FINDINGS? THf Uo.rt/ LA'!(n HAS' ALL B;EN REPLANTED ANO'riD ADDITIONAL LAND WHICH'WAS Pfff.VIOUSLV UNOISTUR9FD WAS
-------
06AU"->17 AS Pf = DTCT£0 TC BETTER THAN PREDICTED
(9Y RIVER BASIN)
CITY G2ANTEI COUNTY ST RIVER BASIN NEPA(YR)
013TUR1'.:-D WIT:l?UT RETURNING IT TO ITS ORIGINAL CONDITION.
FORT WtYNE FORT WAYNE, CITY OF
-------
06AUG67 AS PI EOICTcO TO BETTER THAfl PREDICTED
(f.y O'.VrR BASIN)
CITY GRANTEt COUNTY ST RIVER BASIN NEPACYR)
FINDINGS: CUP RENT SEWCP CHARGES AR = iS.10 PER MONTH-LOWEST OF FIV~ PLANTS SURVEYED AROUND LIMA.
MOPT FINDINGS: COST is NOT A SIGNIFICANT BURDEN-NO IMPACT MAS PREDICTED.
CRIDFRSVILLE C RIDE
-------
C6AUG87 6S PPEDKT£0 TO BETTER THAN PPfcOjCTEO
(FjY DIVE" PASIN)
CITY GPANTEL COUNTY ST RIVER BASIN NEPACVR)
NAPOLEON NAPOLEON HENRY OH MAUMEE RIVER BASIN 1977 169
ISSUE: SOCIO/LANCUSF
PREDICTION: THE UPGRADING OF THE PLANT WILL UTILIZE THE CURRENT PLANT SITE AND WILL INVOLVE NO LAND USE CHANGES.
FiriDit'GS: PLANT EXPANSIONS USE EXISTING LAND WITHIN PLANT CONFINES,NO LAND USE CHANGES OCCURED.
MORE FINDINGS: NO LAND us? CHANGES HAV£ OCCURRED DUE TO PROJECT CONSTRUCTION.
NAPOLEON NAFOLCLN HENRY OH MAUMEE RIVER BASIN 1977 170
ISSUL: socio/propvAL
PREDICTION:
FINDINGS: PROPERTY V»LUCS ALONG THE VAN-HYNING SEWFR LINE WEP= ESTIMATED TO HAVE INCREASED BY APPROX. zot.
MORE FINDINGS: NJ PPEDICTILN w«<; MADE REGARDING THE 201 INCREASE in VALUE OF THOSE PROPERTIES ALONG THE VAN-HYMING
SiUEF LINL
PIDG'CVILLE CC'KNrP.S HCtm COUNT YC RIOGFVILLE C03NE35) H?NRY OH MAUMEE RIVER BASIN 1976 171
ISSUE: scciQ/EKPLflY
PREDICTION: COLLECTION SYJTEM EXCAVATION WILL CAUSE TEMP.INCONVENIENCE t A TEMPORARY LOSS OF CUSTOMERS FOR BUSIN.
FINCI'IGS: TH€ CF'RftnP CONFIRMED ONLY ONC MJNOR C3MPLAINT FROM A FURNITURE STORc RE: BLOCKING THE ENTRANCE.
'.. THE CONiTR. ?t|Gi:ii:Ei* CONSULTED WITH THE STORE OWNtR TO INSTALL THE LINES t REPAVE AS SOON AS POSSIBLE
HOP1! FlNDlNC-i: PP;:DICT;i|| WAS ACCURATE IN A QUALITATIVE SENSE, ALTHOUGH THIS WAS THE ONLY DISRUPTION RECOLLECTED
RIDGEVILLE CORNERS HEIlOY C 3UNT Y( -BIOGEV ILL c COPNE^i) HENRY OH MAUHEE RIVER BASIN 1976 172
ISSUE: SDCIC/LANOU3E
PREDICTION: TH^ PPOPOJEO FACILITY WILL USE UP SIXTEEN ACRES N^AP. OWL CREEK
FltJOr'J&S: Tit' PLANT C ON i TtfijC T F ON USLiO ONLY APPROXIMATELY 12 AC^ES OF LAND.
MOR' FINDINGS: LAND USED UP WAS LESS THAN THE AMOUNT ANTICIPATEDOSX LESS)
PIOG«3VILLE CCRiliRS HTIJPY C OUNT Y( PI OGEV ILLE COPNERS) HENRY OH MAUMEE RIVER BASIN 1976 173
ISSUE: SOCIO/SECOEV
PREDICTION: INOUCLD GROWTH MAY TAKE LAND FO« AGRICULTURAL usc ALONG u.s. RT. 6 & STATE RT. 34
FINDINGS: MINIMAL <»S 110.NTIAL GROWTH HAS OCCURRED, THOUGH TS INSIGNIFANT IN QUANTITY.
THE AFEA IS(C WAS) RES IDE NT I ALLY ZONED
MORE FINDINGS: THUS Ftf L&IIO USFD HAS BE=N THAT ZONCO RESIDENTIAL, NOT AGRICULTURAL.
TOLEDO TOLEDO-U4Le?ICGE WOOD OH MAUMEE RIVER BASIN 1980 174
ISSUE: SOCIO/LANDUS11 X
PREDICTION: PROPER LAND USF MANAGEM£'JT snouL1: DISCOURAGE DEVELOPMENT IN AGRICULTURAL* ZONED AREAS.
FINDINGS: NO MAJOR TRACTS OF AGRICULTURAL LAND H»V£ BEEN DEVELOPED FOR RESIDENTIAL EXPANSION.
-------
C6AUG87
CITY
AS PPEDICTCO TO BETTER THAN PREDICTED
S50 FINANCIAL SUID'N ON P ^SIDEUTS. ?3TI MAT tO »=E = S OF *260/YR.
FIUOI'IGS: Ui^K FFIS TP i
MORE FINDINGS: uirR Ft.s ft«v I
WCSTOH W'STON,VILLAG? ^F WOOD OH MAUHES RIVER BASIN 1979 178
ISSUE: S3CIO/LAMDUSF
PRUOICTION: TH- PK'CPOSrD 54NITA?Y SHWcRS WILL 3r IN TH = PUBLIC RIGHT-OF-WAY AND WILL ENTAIL NO LAND USE CHANGES
FINDINGS: TH: s=w:-3 L:M£S a?e ALONG PUBLIC RIGHTS-OF-WAY AND HAVE ENTAILED NO LAND USE CHANGES.
MORE FINDINGS: PREDICTION HAS ACCURATE.
HESTON W^STON,VILLAGE OF WOOD OH MAUIE= RIVER BASIN 1979 179
ISSUE: SOCIO/USrRCHG
PREDICTION: ESTIMATED MJNTNLY CHARGE OF $io-it PER MONTH FOR THE TYPICAL RESIDENTIAL CUSTOMER.
FINDINGS: THE CURRENT SASC RATE USER FEC is $12.35 PER MONTH.
MORE FINDINGS: THE PREDICTION WAS ACCURATE.
GOODHUF -GOOOHOe,CITY OF •GOQDHWE MN UPPER MISSISSIPPI 1982 &80
-------
06&UG8T
AS PREDICTED TO 3ETUR THAN PREDICTED
(BY <>IVi3 8ASIN)
ST RIVER BASIN
CITY GPANTEE COUNTY
ISSUE: SOCIO/LANDU5"
PREDICTION: CONSTRUCTION 3F A LAGOON WILL COVER 12.9 ACRES OF LAND.
FINDINGS: LAGOON WAS NOT CONSTRUCTED,INSTEAD A RBC WAS INSTALLED.THE 12.9 ACRES HAS NOT USED.
NEPA(YR)
MORE FINDINGS: IN ST-P 2,THE 12.9 ACRE LAGOON WAS FOUND TO 8? INAPPROPRIATE,SOILS WERE TOO PERMEABLE AND IT WOULD
HAVE BEEN ON A FLOODPL AIN. INST E AO OF A LAGOON, A RBC WAS CONSTRUCTED.
RUSHFORD
ISSUE:
PREDICTION:
FINOINGS:
FILLMOR3
MN UPPER MISSISSIPPI 1980
181
RUSHFORO.CITY OF
SOCIO/LANDUS-
NO ABNORMAL LAND USE CHANGES ARE EXPECTED
3USHFCPD GROWTH MOSTLY ON SEWEB rXT^ISIONS SINCE 1932 IN NORTH t NORTHEAST. SEVERAL NEW DRY INDUSTRIES
TOWN' OF RUSHFJSD (50 HOMES) CONNECTS SOON. NEW NURSING HOME N. OF CITY t 50 NEW HOMES CALMOST 500
NcW P£OPL;> ILL DEVELOPMENT HAS TAKEN PLACE WITHIN AREA ANTICIPATED BY CITY. OLD PLANT NOT YET REMOVED
MOPE FINDINGS: DEVELOPMENT AS ANTICIPATED. SLUDGE DISPOSAL AS ANTICIPATED. FALLOW FARM BOUGHT BY CITY USED FOR NEW
T SIT£.
FILLMORE
MN UPPER MISSISSIPPI 1980
182
RUSHFQRT RUSHFOFD.CITY OF
ISSUE: SOCIQ/UiEPCHG
PStOKTION: AVERAGE MONTHLY COST PFR RESIDENT CONNECTION IS ESTIMATED TO BE t4.10 ASSUMING ANNUAL COST $33,079
FINDINGS: r.^p.n-t>f s?w.:* us" CHARGES SINCE COMPLETION OF NEW PLANT ARF »4.52 PER RESIDENCE t $o.SB/THOUSAND GAL.
MORE FINDINGS: USCR CHARGE SPPX AS ESTIMATED ».
. HOWEVER, NO MENTION OF VOLUME CHARGE IN ORIGINAL PROPOSAL.
ALH« MUNICIPAL WASTSWATER TPMT PLT BUFFALO
wi UPPER MISSISSIPPI 1983
ALMA
ISSUE:
PREDICTION: THE PI;CJECT MIGHT RESULT IN INCREASED EMPLOYMENT ous TO CITY GROWTH AND INDUSTRIAL EXPANSION.
FINDINGS: THERE 'iAS NOT ?c?N ANY INCREASE IN EMPLOYMENT.
183
FINDINGS: NO UNP^OKTEO IMPACTS NOTED.
HOWEVER,THFRE is SOME INCONSISTENCY IN THAT ELSEWHERE INDUSTRIAL GROWTH WAS SPECIFICALLY NOT PREDICTED
NO INCPu»3= IN IMPLOYME'IT HAS OCCURRED.
ALMA ALPS MUNICIPAL WASTEWATER TRMT PLT BUFFALO
ISSUE: SOCIO/LANCUi?
PREDICTION: TWO ADDITIONAL ACRES WILL ef REQUIRED FOR THIS PROJECT.
FINDINGS: TWO ADDITIONAL ACRFS OF LAND WERE USED FOR THIS PROJECT.
WI UPPER MISSISSIPPI 1980
184
MORE FINDINGS: LAND USE PREDICTIONS WERE ACCURAT:. LAND USE PATTERNS IN THE SERVICE AR;A WERE NOT AFFECTED.
ALMA ALMA MUNICIPAL WASTEWATER TRMT PLT BUFFALO
ISSUE: SOCIO/SECDEV
PREDICTION: INCREASED OLV^LOPMENT WILL NOT OCCUR.
FINDINGS: THERE HAS MCT ?iEN INCREASED DEVELOPMENT.
WI UPPER MISSISSIPPI 1980
185
MORE FINDINGS: INCREASED DiV.-LQPMENT DIO NOT OCCUR.
-------
C6AUG67
CITY
AS PREDICTED TQ HETTER THAN PREDICTED
*z-.n LIMITED GROWTH m SERVICE AREA.TWO ntw INOUSTRISS.BUT THEY OON«T DISCHARGE PROCESS HZO.
S-.VL?AL nnuj's HAVE «ii=ii ARLF. TO HOOK IN WHICH COULDN'T BEFORE.
AN INDUSTSTAL °ASK HAJ dE£N PLANNED AND ALLOWED FOR.
FINDINGS: PLAI(T
HAS NOT ResuLT^o IN ANY SIGNIFICANT LAND USE CHANGES OR INDUCED GROWTH.
PAUGOR
ISSUE:
PREDICTION;
FINDINGS:
LACROSSF.
WI UPPER MISSISSIPPI
1979
189
, VILLAGE Oc
SCCIC/USEPCHG
IllCKEAStO POWJP F3P TRANSPORT t TREATMENT; C JUSTRUC T TON COST; HIGHER SEWER RATES DIFFICULT FOR FIX INC
33 Nr.W SPW-X USCRS SINCE PLANT OPENED. CURRENT RATT 5/3" MSTER t23.69/QUARTER <450 CUSTOMERS).
1994 SHWAiT UTILITY OPERATING COSTS LiSS THAN BUDGET FOR 1981.
MDKT FINDINGS:
SEWCR USE CHAKGcS TRIPLED WHEN ?IEW PLANT OPENED. 5/3 IN LINE WAS »27/QUARTER 1980. 1985 DOWN TO $23.69
NZW PLANT HUP; tXPFNSIVr TT RUN THAN OLD PLANT, AS EXPECTED. ST'ONG IMPACT BECAUSE HIGH T RETIRED POP.
GEHIR*L LONGTfRi: DEBT PAYABLC INCREASED, BUT «936,C'CO NEW ASSESSED VALUE DUE TO WWTP HELPS PAY IT
BRUCE bPUCil,VILLAGE OF RUSK
ISSUE: SOCIO/LANOUSE
PRfOICTIQN: TH = f.= WILL BE NO LAND USE IMPACTS/CHANGES.
FINDINGS: PLANT IS ON EXISTING TREATMENT PLANT SITE OWHED BY BRUCE.
WI UPPER MISSISSIPPI
1980
190
MORE FINDINGS: PREDICTION was ACCURATE.
BRUCE EPUCI,VILLAGE OF
ISSUES SOCIO/USEPCHG
. PREDICTION: . USCR &HARGF.-TC FAMGE FPQ>*
RUSK
WI UPP5R MISSISSIPPI
1983
191
TO $9.87'
-------
C6AUG87 AS PREDICTED TO BETTER THAN PREDICTED
(EY R1VC-P BASIN)
CITY GPAN7EE COUNTY ST RIVER BASIN NEPA(YR)
FINDINGS: ACTUAL 1984 OtM COSTS WERE $19,529. ACTUAL USER CHARGE IS *5/MONTH PLUS 41.35/1000 GAL.
HOF
-------
06AUG87
AS PREDICTED TO BETTER THAN PREDICTED
CBY RIVER BASIN)
CITY
DE SOTO
ISSUE:
PREDICTION:
FINDING'S:
G RANT EL-
COUNTY
ST RIVER BASIN
NEPA(YR)
VERNON/CRAWFORD
WI UPPER MISSISSIPPI 197B
197
DESOTO,VILLAGE OF
SCCIO/USERCHG
THE PAY SCHEDULE HAS B?EN DETERMINED TO BE $10.50/MQNTH/MOUSEHOLD.
CURRENT MONTHLY SEWER USE RATES (SINCE 1980) ARE «13.50/RESIDENCE. *22/BUSINESS, $13/CHURCH, »5/MOTEL,
I56C/SCHOOL. USER BASE IN 1985 IS 126 RtSIDENCES. 19 BUSINESSES,3 CHURCHES, 10 MOTELS. 1 HIGH SCHOOL.
MOPE FINDINGS: ACTUAL RESIDENTIAL USER CHARGES 198:-1985 ARE *3.oo PER MONTH HIGHER THAN PREDICTED <29t HIGHER)
HOUSEHOLD INCOME IN DE SOTO HAS RIS£N LeSS THAN 29t SINCE 1978 UHEN FNSI WAS WRITTEN.
9UFFALQ
WI UPPER MISSISSIPPI
1979
198
FOUNTAIN CTTY FOUNTAIN CITY,CITY OF
ISSU:: SOCIO/EMPLOY
PREDICTION: CORPS OF ENGINEERS EMPLOYMENT INCL. DREDGE MAINTENANCE YARD WILL NOT BE AFFECTED BY THE PROJECT.
FINDINGS: MANUFACTURING t DETAIL EMPLOYMENT IN BUFFALO COUNTY IS VERY SMALL.AGRICULTURAL EMPLOYMENT IS LARGE.
rMPLOVMtNT HAS HOT CHANiED.
MOR? FINDINGS: EMPLOYMENT HA> no' CHANGED.
BUFFALO
WI UPPtR MISSISSIPPI
1979
199
FOUNTAIN CITY FOUNTAIN CITY,CITY OF
ISSUE: SOCIO/LANOUSE
PREDICTION: TH- PROVISION OF ADDITIONAL SEWAGE COLLECTION WILL HAVE NO MAJOR EFFECT ON RESID.COMM.OR INO. GROWTH.
FIHOINGS: • CiTY ST;LL HIIULY Rtsro^NTiAL.Nj LAND USF CHANGES.NO SIGNIFICANT GROWTH IN THE AREA.
MORE FINDINGS: LAUD
s: PATTERNS HAVE NOT CHAMGFD.NO GROWTH IN THE AREA.
PHILLIPS
ISSUE:
PREDICTION:
FINDINGS:
PRICE
WI UPPER MISSISSIPPI
PHILLIPS,CITY QP
SCCIP/UiERCHG
MONTHLY USER CHARGE F3R DEBT AND OEM WILL 5E «12.65 /MO.
OtM CHARGES F0° 198* WERE »5.56/MO. DEBT SERVICE IS NOT PART OF USE* CHARGE.
1983
200
MORE FINDINGS: otw CHARGE ACCURATELY PREDICTED
PLUM CITY
ISSUE:
PREDICTION:
FINDINGS:
PLUM CITY,VILLAGE
SOCIO/rMPLOY
PISRCE
WI UPPER MISSISSIPPI 1979
201
MORE FINDINGS: NO IMPACT ON IMPLOYMENT Has RESULTED.
PLUM CITY
ISSUE:
PREDICTIONS
FINDINGS:
PLUM CITY,VILLAGE OF
SCCIO/LANOUSE
PIERCE
WI UPPER MISSISSIPPI 1979
202
-------
AS pPEDic'io TC »ETT-:R THAN P^EDICT^C
C>Y RIVCP PASIN)
CITY . GFANTFl. COUNTY
FINCZNGS: LAV: USf. PCTTrRNS IN THf S'RVIC: AREA WERE NOT AFFECTED.
ST RIVER BASIN
HEPACYR)
PLUM CT.TV
issu;::
PI'RCc WI UPPER MISSISSIPPI 1979
SCCIO/PDP
'i:
FItiOlNGS:
MOR: Fir.Discs: MINIMAL IMPACT TO POPULATION HAS RFSULTCO FROM THE PLANT EXPANSION.
PLUM CITY.VILLAGE OF
SCCIO/PDP
ACCCPCTNG TC VILLAGE PRESIDENT. 1935 POPULATION is s"9, UP FORM 485 IN 1978.
V-.iR ;rCJ PCpULiTl3N PPOJECTF.C A3 8?9.
203
PLUM CITY
ISSUt:
PFEP:CT:"?N:
PIERCE
WI UPPzR MISSISSIPPI 1979
PLUM C;TY,VILLAGE 3e
SOC:C/;ECOFV
C.'MMU!.:TY Gl CWTH WILL 8:. PCSSIOLr THROUGH ENLARGED WWTP CAPACITY.
tun AP'f-yiljT r.QMPLZ-XHS TCTALING 13 UNITS HAV5 BESh «UILT SINCE THE PROJECT.
204
MCRF riNDINCS: AS A CliULT ?F TM.; PCOJ£CT,TME MORATORIUM ON SEWEP tXTFNSIOHS WAS LI FTEO.ALLOWING RESIDENTIAL GROWTH
SHELL LAKT *-.LL L4K"(CTTY Cc
ISSUE: !ocir/',-;c?cv
PPF.DICTION: no piPT:cuLi? icctLr?ATicn
Firitir.'Cs: Av/kAi. : WA$TCWUC° FL:H is
WASH?URN
WI UPP£R MISSISSIPPI 1983
''Go.
205
" FINDINGS:
NO S:GM:CICANT INCREASE IN OEVELOPMENT.
wASHDURf4
HI UPPER MISSISSIPPI 1980
206
SHELL LAK: 'H::LL uiK.^.ciTY ?•=
ISSUf: iJCIO/L'SERCHG
pptoiCTion: FUTURE, us:? CHARGES WILL BF 17 TO IS/MONTH PER HOUS;HCLO: USER CHARGES WILL INCREASE ou: TO PROJECT
F:I.O;NI,S: ^TJ^ATtO us^ CHAC.JFS A^L in. 32 PTR MO f>i?.
1934 !! t (I C?:T FIJ11 NSW PLRIIT 15 »22,•! I'J TH1: R'ST OF THE PLANNING A^iA WAS MOT AFFECTED.
,VILLiGr
WI UPP£R MISSISSIPPI 1980
208
-------
060UGS7
CITY
ISSUE:
PREDICTION:
FINDINGS:
AS PhEDICTrO TO SETTER THAN PREDICTED
(BY RIVER B4SIN)
ST RIVER BASIN
NEPACTR)
li?IANTE£ COUNTY
S3CIO/SECDEV
N3 DEVELOPMENT WILL RESULT FROM EXPANSION OF THE FACILITY. NORMAL GROWTH MILL BE ACCOMOOATEO
TWO RESIDENCES HAVE SEEN CONSTRUCTED AS A RESULT OF THE SEWER LINE EXTENSION.
MORC FINDINGS: ALTHOUGH NO DEVELOPMENT was ENCOURAGED, NORMAL CITY GROWTH WAS ACCOMODATED
W5STBY
ISSUE:
PREDICTION:
FINDINGS:
VERNON
WI UPPER MISSISSIPPI
1979
209
WESTBV SrWAGE TREATMENT PLANT
SOCIO/LANDUSE
AVAILABILITY QF ADEQUATE TREATMENT NOT EXPECTED TO SIGNIF CHANGE PATE,OENSITYiOR TYPE OF DEVELOPMENT
NO NEW DEVELOPMENT SINCE PLANT STARTUP,6? UNITS BUILT JUST BEFORE ARE IN LINE WITH LAND USE PLAN.
MORE FINDINGS: CITY ADOPTED LAND USE PLAN AND ZONING JUST BEFORE FACILITY PLAN WAS WRITTEN.60 NEW HOUSING UNITS WERE
TUlLT -Ic'fOR'': PLANT OPENSOsLCCATEO ACCORDING TO PLAN.NO NEW INDOOR COMMERCIAL OEV.CITY NOT ABLE TO
EXTEND SEWERS TO ALL INTENDED AREAS IN TOWN DUE TO ENGINEERING PROBLEMS,SO SEPTIC SYSTEMS STILL USED.
ST. LOUIS
ISSUE:
PREDICTION:
FINDINGS:
ST. LOUIS,
SCCIO/LANDUS^
CITY Oc
GRATIOT
MI SAGINAW RIVER BASIN 1976
210
NO MAJOR CHANGE IN LAND USE HAVE OCCURRED.
MORE FINDINGS:
BURTON
ISSUE:
PRtDICTION:
FINDINGS:
MI SAGINAW RIVER BASIN 1978
211
1 COUNTY (OAVISON SEGMENT) GENESSEE
SOCIO/LANDU5E
SOME INCREASE DEVELOPMENT WITHIN SERVICE AREA IN LIEU OF SCATTERED DEVELOPMENT IN OUTLYING AREAS.
SLIGHT INCREASE IN COMMERCIAL DEVELOPMENT. INSIiiMIFICANT GROWTH IN RESIUENTAIL SECTOR.
MORE FIflDINGS: SLIGHT DEVeLOPMFNT IN COMMERCIAL SfCTOR. INSIGNIFICANT GROWTH IN RESIDENTIAL SECTOR.
BURTON
ISSUE:
PREDICTION:
FINDINGS:
GENE3SEF COUNTY COAVISON SEGMENT) GENESSEE
SOCIO/USERCHG
EXISTING INDEBTEDNESS WOULD INCREASE
r.XISTING INDEBTEDNESS DID NOT INCREASE.
MI SAGINAW RIVER BASIN 1978
212
MORE FINDINGS: EXISTING INDEBTEDNESS DID NOT INCREASE. TAP-IN FEES WERE THE PRIMARY FUNDING FOR NEW CONSTRUCTION SI
NC!: GfcA»iT MONIES WESE NOT RECEIVED IN TIMi TO DO TH£ WORK. USE FEcS INCREASED BY $1.00/CUSTQMER/MTM
CASS
ISSUES
PREDICTION:
FINDINGS:
TUSCOLA
MI SAGINAW RIVER BASIN 1977
SAGINAU COUNTY WTP
SOCIO/LANOUJP
N=W SEWER CONSTRUCTION IN SUBSTANTIALLY DEVELOPMENT AREAS SHOULD NOT CHANGE LAND USE
THr: PLANT EXPANSION HAS NOT RESULTED IN LAND USE CHANGES.
213
MORE FINDINGS:
-------
C:TV
AS PfFOTCT£0 TC P,":TTiR THAN PREDICTED
(?r BlVb'R BASIN)
COUNTY
ST RIVER BASIN
NEPA(YR)
DURAHD
ISSUE:
PREDICTION:
NO CHANGES IN LAN? USE DUi TO PFOJECT.
NC LAUD USF CHAMGL.
SH:AWASSEE
HI SAGINAU RIVER BASIN 1976 21*
MOP.F FINDINGS:
GLADWIH
ISSUC:
PREDICTION:
FINDINGS:
GLADWII..CITY OF
SCCIO/SECC-V
NC inoucED GP:WTH OR POPULATION SHIFTS
HO AOVrRSE IMP4CTS OCCURRED
GLADUIN
HI SAGINAU RIVER BASIN 1976 215
*. FINDINGS:
HOLLY
ISSUE:
FINDINGS:
CAKLANU COUNTY OPU
OAKLAND
TH'Rc WILL (>= NO aPPPECIAflLfc EHPLDVHENT CHANGE.
TWO ntw FLILLTZML ;MPLQYS^S WER? HIPED AT THE PLANT.
HI SAGINAU RIVER BASIN 1977
216
FINDINGS :
HCLLY
ISGUf:
PREDICTION:
OAKLAHO
HI SAGINAM RIVER BASIN 1977
217
DAKLANC' COU''TV "PW
SCCIO/LAHCDiE
THCRE WILL f.T NO APPRECIABLE LAUD USE CHANGE.
$CMc ADDITIONAL G30wTH NOu IN AREAS WH^RE GROWTH WAS CURTAILED BY LIHITATIONS
TH CH31TF StSTrftS. NO CTHCF GROWTH HAS TAKEN PLACT.
FINDINGS: SOME RESIDFNTHL HOOK-UP TO SFHEP SVST=H HAS TAKEN PLACE WHERE EXISTING HOUSES ARE ADJACENT TO NEW s
EWER LINES. HCWEViP, NO INDUCED COMMUNITY GROWTH HAj TAKEN PLACE.
HOLLY
ISSUE:
PREDICTION:
FINQICGS:
OAKLAND COUNTY OPW OAKLAND
SCCIO/POP
VILLSi,H POPUL/lTIiDN WILL GROW.
TH3 PR'ScliT VILLAGE POPULATION IS APPRCKIH4TELY 575Jt INDICATING
GROWTH AT 4 PATt SIMILAC TO THE HISTORICAL RATE.
HI SAGINAW RIVER BASIN 1977
218
MORE FINDINGS:
MOWELL
ISSUE:
PREDICTION:
LIVINGSTON
HOWELL.CITY OF
SOCIO/LAMOJSE
GROWTH JND US= OF INDUSTRIAL ZONED LA'IDS FOR SLUDGE HANDLING.
HI SAGINAW RIVER BASIN 1976
219
-------
C6AU087
AS P'-CDICTED TO 3ETTiR THAN PPEDICT'rO
ChY PIVcR BASIN)
CITY GPANTft COUNTY ST RIVER 3ASIN NEPA(YR)
FINDINGS: INDUCED GROWTH AS PREDICTED. US- OF INDUSTRIAL ZONED LAND FOR SLUDGE HANDLING.
MDR5 FIHOINGS: RESIDENTIAL ANO INDUSTRIAL GROWTH HAS OCCURRED. PLANT EXPANSION PERMITTED. PEPSI-COLA AND INTERNATIO
NAL PAPtR TO INCREASE THEIR W&STEWATER CONTRIBUTIONS BY 30-40?. ALLOWED OGIHARA IRON WORKS TO OEVELO
LAPEHF LAPEER.CITV OF LAPcER HI SAGINAW RIVER BASIN 1976 220
ISSUE: SCCIO/EMPLOV
PREDICTION: TII~ WWTP WILL CREATE 7 PERMANENT JOBS.
FINDINGS: PIVE P^PM-M^NT JOBS WERE CREATED.
MCF= FlhPtNGS:
LAPtER L«P5i-e,CITY Oe LAPEER HI SAGINAW RIVER BASIN 1976 221
ISSUE: SOCIO/LANOUS!:
PREDICTION: INOUC;P POPULATION GROWTH
FINDINGS: POPULATION GPOWTH OCCUPRtO
HOPS FINDINGS: suRSTanTiiL itiousTRiaL GPQWTH is ANTICIPATED IN THT FUTURE CUE TO ANNEXATION. CITY is PLANNING TO AN
; NHX PORTION OP AL9« CO. WHICH IS. ALREADY 3EWEREO.
TITTAB4WdSS = F. TrfP TI TTi? A WA SSE" TWP WWTP SAGINAW MI SAGINAW RIVER BASIN 1979 222
ISSUt: SOCIO/LAMOIJ3?
PPEOICTION: ' PLANT FIXPANSUN WILL NOT CURTAIL LAKO us?.
FINDINGS: TH PLAIIT EXPANJICN DID NJT CURTAIL LANO USE.
MORE FINDINGS:
TITTAPAWASSEE TWP T TTT A? AWi SS'I; TWP WWTP SAGINAW MI SAGINAW RIVER BASIN 1979 223
ISSUE: SOCIO/Pf OPVAL
PREDICTION: to CHANGE in PROPERTY VALUE FROM THS PROJECT.
FINDINGS: THF PROPERTY vatui OF ADJACENT AGRICULTURAL AND INDUSTRIAL ZONED LANDS
WcRE HOT IMPSCTED BY THn PROJECT EXPANSION.
MORE FINDINGS:
TITTAEAWASSEE TWP TZTTABAWASSEE TWP WWTP SAGINAW MI SAGINAW RIVER BASIN 1979 22*
ISSUE: SOCIO/SCCOPV
PREDICTION: no DISPLACEMENT, INCREASED RESIDENTIAL t COMMERCIAL DEVELOPMENT SHOULD OCCUR.
FINDINGS: NONE WAS FOUND.
MORE FINDINGS:
-------
C6AUG87 AS PFEDICTrO TO BETTER THAN PREDICTED
C5Y RIV:« BASIN)
CITY GrANTEC COUNTY ST RIVER BASIN NEPA
-------
06AUG87
AS PF.EDICTtO TO 3ETTER THAN PREDICTED
(?Y PIVEP BASIN)
CITY C?ANTE; COUNTY ST RIVER BASIN
MOPE FINDINGS: FLAPGATES INSTALLED AT OVERFLOWS TO CORRECT ELEVATION RELATED OVERFLOW PROBLEMS.
NEPACTR)
NAPOLCPN N4POLeCN HENRY . OH MAUMEE RIVER BASIN 1977 231
ISSUE: AGPICULTUR5
PREDICTION:
FINDINGS:
MORE FINDINGS: NO IMPACTS HER"- PREDICTED OR DTSCCVEI-FD REGARDING AGRICULTURAL LAND USAGE.
PIOGEVILLE CORNERS HENRY CSUNTYCRIOGEVILLE CORNERS) HENRY OH MAUMEE RIVER BASIN 1976 232
ISSUE: AGRICULTURE
PREDICTION: 16 ACR=S OF AGRICULTURAL LAND COMMITTED FOR USE AT STP.
FINDINGS: iz ACKF:; USED FOP TRCATM^NT PLAMT SIT£.
MORE PIUDINGS:
TOLEDO TOLEOO-W&LBRIOGE ' WOOD OH lAUSEE RIVER BASIN 1980 233
ISSUE: A'iRliCULTUR1
PREDICTION: THE PROPOS?O PROJECT SHOULD NOT OIPECTLY TAKE ANY LAND OUT OF AGRICULTURAL PRODUCTION
FINDINGS: NO COMMERCIAL OR RESIDENTIAL DEVELOPMENT ON AGBKULTURAL LAND TO DATE.
MORE FINDINGS: NO IMPACTS TO AGRICULTURAL LAUDS HAVE OCCURRED.
TOLEDO TOLEDO,CITY 3*= (Tr.M MILE CRrEK) LUCAS OH MAUMEE RIVER BASIN 1977 23*
ISSUH: AG=>ICULTKR =
PRfDICTION:
FlhDINGS:
MORE FINDINGS: NO AGPICULTURAL IM°ACTS WERE PREDICTED OR DISCOVERED
• •••——••—•—»»—"•—"•—••"» — —»«•——"—"»«""•"»• ^••^^^••••••^ V ««••_•»<•«•• ^^••^^••••^ ^••^••^••^^IB flB^^^aB M <«>«B<»a>V>^^^^^^^^^^^
-------
C6AU08T
AS PREDICTED TO SETTER THAN PREDICTED
(BY RIVER BASIN)
ST RIVER BASIN
NEPA(VR)
CITY GRANTEE COUNTT
ISSUE: AGRICULTURE
PREDICTION:
FINDINGS: NO APPARENT IMPACT ON AGRICULTURE. SECONDARY IMPACT POSSIBLE IN FUTURE FROM NEW DEVELOPMENT ON PASTURE
OR CROPLAND
MORE FINDINGS: NO APPARENT IMPACT ON AGRICULTURE
AUGUSTA,CITY OF
AGRICULTURE
CLAIRE
MI UPPER MISSISSIPPI 1977
237
AUGUSTA
ISSUE:
PREDICTION:
FINDINGS: NO ADDITIONAL LAND WAS ACQUIRED FOF TH': PL ANT. LANDUSE HAS NOT CHANGED SIGNIFICANTLY.
HIGH NITROGEN AND PHOSPHORUS CONTENT OF SLUDGE HAS BEEN OF 3ENEFIT TO LOCAL FARMERS AS FERTILIZER.
MORE FINDINGS: AGRIC. ISSUES WERE NOT ADDRESSED.AGRlC LANDS HAVE MOT BEEN LOST C BENEFITS FROM SLUDGE ARE POSITIVE.
6ANGOR
ISSUE:
PREDICTION:
FINDINGS:
LACROSSE
WI UPPER MISSISSIPPI
1978
238
6ANGOR,VILLAGE OF
AGRICULTURE
REMOVAL OF AGRICULTURAL LAND FOR PERMANENT USE AS A WASTEWATER TREATMENT SITE CANNOT BE AVOIDED
UfcW PLANT BUILT ON OLD GRADED SITE. SOME EXPANSION NECESSARY BUT NOT INTO AGRICULTURAL LAND.
FARMER TAKES ALL SLUDGE PRODUCED IN WET FORM c USUALLY INCORPORATES IMMEDIATELY.
MORE FINDINGS: NO FARMLAND HAD TO BE ELIMINATEO-:AT ALL BECAUSE OF USE OF PREVIOUS PLANT SITE
BARRON
ISSUE:
PREDICTION:
FINDINGS:
BARRON
PAKRQN.CITY OF
AGRICULTURE
LOSS CF SOME AGRICULTURE LAND
TURKFY FARM STILL IN OPERATION, LOSS OF LAND APPEARS NOT LARGE.
WI UPPER MISSISSIPPI
1980
239
MORE FINDINGS: PREDICTION OF SOME LOSS is CORPICT
BIRCHWQOD
ISSUE:
PREDICTION:
FINDINGS:
WASHBURN
BIRCHWOOD,VILLAGE OF
AGRICULTURE
NO IMPACT Oil AGRICULTURE
FARMER USES ADJACENT LAND FOR CATTLE GRAZING.
MUCH OPEN LAND IN AREA.
WORE FINDINGS: NOT AN ISSUE, ACCORDING TO LPCAL VIEW.
WI UPPcR MISSISSIPPI
19B2
240
BRUCE
ISSUE:
PREDICTION:
FINDINGS:
BRUCE,VILLAGE OF
AGRICULTURE
NEW FACILITY 3UILT ON EXISTING SITE.
RUSK
WI UPPER MISSISSIPPI 1980
2*1
MORE FINDINGS: NO AGRICULTURAL LAND WAS USED AS TREATMENT FACILITY WAS BUILT ON EXISTING SITE DEDICATED TO WASTEWATER
-------
06AUG87
CITY
AS PREDICTED TO BETTER THAN PREDICTED
(OT RIVE" 3ASIN)
GPANTEC COUNTY
TREATMENT
ST RIVER BASIN
NEPACYR)
BUTTFRNUT
ISSUE:
PREDICTION:
FINDINGS:
ASHLAND
BUTTERNUT,VILLAGE OF
AGRICULTURE
SOME MINOR CROP LOSS, DUE TO LOSS OF 25 ACRES FOR SEEPAGE PONDS
ABOUT 25 ACRES REMOVED AS PREDICTED.
UI UPPER MISSISSIPPI 1981
242
MORE FINDINGS: AREA is NOT LARGE. THERE ARE OTHER LOCAL OPEN AREAS. IMPACT is MINIMAL
CORNELL
ISSUE:
PREDICTION:
FINDINGS:
CHIPPEWA
UI UPPER MISSISSIPPI
1980
243
CORNELL,CITY OF
AGRICULTURE
ASSOCIATED LOSS OF FARM LAND ASSOCIATED WITH INCREASED GROWTH
THERE HAS B£Etl NO LOSS OF AGRICULTURAL LAND OUE TO TH£ PLANT EXPANSION SINCE NO GROWTH HAS OCCUREO.
AGRICULTURAL LANDS HAVE BENEFITED FROM THE LAND APPLICATION PROGRAM, PARTICULARLY INCREASED ALFALFA.
MORE FINDINGS: AGRICULTURAL LANDS WERE NOT LOST AND BENEFITS HAVE RESULTED FROM SLUDGE APPLICATIONS.
CUMBERLAND ' CUMBERLAND,CITY OF BARRON
ISSUE: • AGRICULTURE
PREDICTION: ' INITIALLY ABOUT 2.3 ACRts WILL ss. PEMOVEO FROM AORTC. USES
FINDINGS: NEW PL&MT OCCUPIES THE 2.3AC SITF Ai P«?tOICTED.
WI UPPER MISSISSIPPI 1978
244
MORE FINDINGS: PLANT OCCUPIES PREDICTED STTC
VcRMON/CRAWFORO
WI UPPER MISSISSIPPI 1978
245
DE SOTO DESOTO,VILLAGE OF
ISSUE: AGRICULTURE
PREDICTION: IT MAY BECOME NECESSARY TO FIND A SLUDGE DISPOSAL SITE .... EITHER AGRICULTURAL LAND OR PUBLIC LANDFILL
FINDINGS: ALL SLUDGE IS SPREAD ON 1 ACRE PER YEAR, ON 1 FARM WITH 40 ACRE APPROVED SLUDGE SITE.
MORE FINDINGS: SLUDGE LANDFILLEO UNTIL 1933 WH^N DE SOTO SLUDGE SITE WAS APPROVED (VILLAGE LANDFILL WAS CLOSED)
ALL SLUDGE GOcS TO 1 FARMER WITH 40 AC'S APPROVED SLUDGE SITE 9UT SPREAD ON ONLY 1 ACRE PER YEAR,
FOUNTAIN CITY FOUNTAIN CITY.CITY OF BUFFALO
ISSUE: AGRICULTURE
PREDICTION: AGRICULTURAL USE OF THE RIDGES WILL CONTINUE.
FINDINGS: NO CHANGES IN AGRICULTURAL USE.
WI UPPER MISSISSIPPI 1979
246
MORE FINDINGS: NO CHANGES IN AGRICULTURAL USE.
PHILLIPS PHILLIPS,CITY OF PRICE
ISSUE: AGRICULTURE
PREDICTION: NO AGRICULTURAL LAND WILL BE LOST AS A RESULT OF PROJECT
WI UPP5R MISSISSIPPI
£980
247
-------
C6AUG87 AS PREDICTED TO BETTER THAN PREDICTED
-------
06AUG97
AS PREDICTED TO BETTER Trt«N PREDICTED
RIVER BASIN)
CITY
GRANTEE.
COUNTY
ST RIVER BASIN
NEPA(VR)
FORT WAYNE
ISSUE:
PREDICTION:
FlhOINGS:
ALLEN
FORT WAYh=,CITY OF (S^
PMYS f'JV/SOILS
SOIL EROSION RESULTING FROM THE CONSTRUCTION CANNOT BE AVOIDED.
NO LCNG-T5PM EROSION PROBLEMS AROSE DUE TO CONSTRUCTION.
IN MAUMcE RIVER BASIN 1980
253
POP.F. FINDINGS: EROSION WAS HOT A PROBLEM AFTER C ONSTRUCTI ON. QUICK BACKFILLING MAS DONE AFTER CONSTRUCTION.
FORT WAYNF FORT WAYN:,CITY OF (SEWEPS) ALLEN
ISSUE: PHYS ENV/TQPQ
PREDICTION:
FINDINGS: TOPOGRAPHY SAME AS PRIOR TO CONSTRUCTION.
IN MAUMEE RIVER BASIN 1980
25*
MORE FINDINGS: TQPOGPAPHY HOT AFFFCTED BY CONSTRUCTION.
ALLEM
IN KAUSEE RIVER BASIN 1980
HONPOEVJLLE HONROr-VILLc.SwG DISPOSAL AUTM
ISSUE: PHYS fNV
PPFOICTION: • WASTE STASILHATICN LAGOON CONSTRUCTED ON A 13 ACRE SITS ADJACENT TO EXISTING PLANT SITE
FINDINGS: ' LAGCCN :s 12 ACR=S /3 STAGE LAGOON ON ACDUT A 6 FOOT RISE APOVS THE PLANT.
255
MORE FINDINGS? LAGOOH CONSTPUCTFD AS DESIGNED.
MONROEVILLF
ISSUE:
PPEDICTION:
FINDINGS:
HOHROEVILLE.SWG OISP3SAL AuTH ALLEH
PHVS cNV/SCILi
=RCSIPN CONTROL M£ASU?ES MILL PE TAKEN
NO NOTICEABLE ^ROjICN IS OCCURRING AROUND THE CONSTRUCTION SITE.
IN MAUMEE RIVER BASIN 1993
256
EROSION P30PLE1S UUPIMG CONSTRUCTION MER' MINIMIZED THROUGH PROMPT CONSTRUCTION OF ZONED AREAS
MORE FINDINGS: NO EROSION PPOBL=MS HAVE CCCUPPEO BECAUSE OF CONSTRUCTION. SITE WAS EXAMINED FOR PROBLEMS
ADA
ISSUE:
PREDICTION:
FINDINGS:
HAPDIN
AOA 3EUAC-? TREATMENT PL»tlT
AI? QUALITY
OUST MOIS1; ANO TRAFFIC CONOgSTION WILL OCCUR DURING CONSTRUCTION
NO EVIDENC? OF PREDICTED I*PACTS-NOISc/3UST/TRAFF1C CONGESTION.
SH?RT-TERM DUST IMPACTS wsoc SIGNIFICANT DURING
CONSTRUCTION.
z FINDINGS: SHIRT URM OUST NOIS? AND TRAFFIC IMPACTS ALSO OCCURRED.
OH MAUMEE RIVER BASIN 1976
257
ADA ADA SPWAG? TREATMENT PLANT HARDIN
ISSUE: PHYS EHV/TOPO
PREDICTION:
FINDINGS: DIPT AND CLAY HILL CREATED WITH EXCAVATED SOIL FROM
INSTALLATION OF .LINES. THE HILL, ABOUT 50-60 FT
OH MAUMEE RIVcR BASIN 1976
258
-------
C6AUG87
AS PR?DTCT=0 TO 3ETTER THAN PREDICTED
(BY PIVtR BASIN)
CITY GRANTEE COUNTY
HIGH, IS USIO FOP WINTER SLEDDING.
MORE FINDINGS: NO PFEOICTTON WAS MADE CONCERNING CREATION of DIRT HILL
ST RIVER BASIN
NEPA(TR)
CRICFPSVILLE CRIDcRSVILLE,VILLAGE OF AUGLIAIZE OH MAUMEE RIVER BASIN 1977 259
ISSUE: PHYS tNV
PREDICTION: .ADVERSE IMPACTS DURING CONSTRUCTION, SHORT TERM, WILL BE MITIGATED
FINDINGS: HO,REMAINING IMPACTS EVIDENT.
MOPE FINDINGS: NO REMAINING ADVERSE IMPACTS
HARROC HAROOD,VILLAGE OF ALLEN OH MAUMEE RIVER BASIN 1977 260
ISSUE: PHYS ENV
PREDICTION: PROJECT WILL NOT IMPAIR LANDSCAPE.
FINDINGS: NO ADVERSE IMPACTS HAVE OCCURRED.
MORE FINDINGS: NO AOVEP.SE IMPACTS HAVE OCCURRED.
KALIOA KALI04,VILLAGE OF '.: PUTNAM OH MAUMEE RIVER BASIN 1976 261
I.SSUE: PHYS cNV
PREDICTION: DISRUPTION uc LAND DURING CONSTRUCTION AND RUN OFF DUE TO CLACK OFJ VEGETATION.
FINDINGS: NO LONG-T^PM AVERSE OTSRUPTIONS OCCURRED DU= TO CONSTRUCTION.
e^SEEDinG.
MOR2 FINDINGS: NO UNANTICIPATED PPOBLcMS OCCURRED DUE TO CONSTRUCTION OF SEWERS AND PLANT.
MONTPILI'P MONTpeLIZl? SWG TQT PLT WILLIAMS OH MAUMEE RIVER BASIN 1980 262
ISSUE: PHYS cNV
PREDICTION: IMPACTS OP $?W?R CONSTRUCTION HILL 3? NOISE, DUST, SOIL EROSiQN.t TRAFFIC DISRUPTION DURING CONSTRUCT.
FINDINGS: THvRS WE1?: NO CONSTRUCTION PROBLEMS INDICATED. PRESUMABLY MITIGATIVE MEASURES WERE EMPLOYED.
MORE FINDINGS: FLAPGATES INSTALLED AT OVERFLOWS TO CORRECT ELEVATION RELATED OVERFLOW PROBLEMS.
NO EROSION P'0«LpMS NOW N33 DURING CONSTRUCTION AT LOCATION OF FLAPGATES.
NAPOLEON MAPOL=bN HENRY OH MAUHEE RIVER BASIN 1977 263
ISSUE: PHYS tNV
PREDICTION:
FINDINGS:
MORE FINDINGS: NO LONG-TERM PHYSICAL ENVIRONMENT CHANGES HAVE OCCURRED DUE TO PROJECT CONSTRUCTION.
RIDGEVlLLf CCRN3RS HENRY COUNTY(3IDGEVILLE COPNERS) HENRY OH MAUMEE RIVER BASIN 1976 26*
-------
06AUG87 AS PPED'CTEO TO B«fTT:R THAN PREDICTED
(f:Y «IViR RASIH)
CITY GO ANT EL COUNTY ST RIVER BASIN NEPA(YR)
ISSUE: PHYS CUV
PREDICTION: CONSTRUCTION NOISES MAY^' I«OVE DESIRED LEVELS t DISRUPTION OF VEHIC/PEDES. TRAFFIC MILL BE TEMP t WIN
FINDINGS: TH= PLT. OP^RA-TOR INDICATED THERE WERE NT PROBLEMS OF SIGNIFICANCE ASSOC. w/ NOISE OR TRAFFIC.
MORE FINDINGS: AS TH£ FACILITIES PLAN STATED, CONSTRUCTION IMPACTS H~R£ TEMPORARY AND APPARENTLY MINIMAL
NO UNUSUAL P^OHLEMS OCCURRED TO PRESENT A SIGNIFICANT OISTRUBANCE OR DISRUPTION
TOLEDO < TOLEOO-WALBRIDGE WOOD OH MAUMEE RIVER BASIN 1980 265
ISSUE: PHY3 sMV
PREDICTION: THE PROJECT SHOULD NOT IMPACT FLORA AND FAUNA IN THE AREA.
FINDINGS: SEWER R£HAUILITAION WAS ACCOMPLISHED THROUGH EXISTING RIGHTS-OF-WAY.
\ SMALL &L4Y-PARK HAS CONSTRUCTED WITH JVERBUROEH WHICH WAS NOT USED FOR THE PRO
MORE FINDINGS: $:WER REHABILITATION UAS ACCOMPLISHED THROUGH EXISTING RIGHTS-OF-WAY, NO FLORA OR FAUNA WAS IMPACTED.
A SHALL PLAY-PARK WAS CONSTRUCTED WITH CVERBUROE WHICH WAS NOT USED FOR THE PROJECT.
TOLEDO TOLrDO.CITY QF (TEN MILE CREEK) LUCAS OH MAU1EE RIVER BASIN 1977 266
ISSUE: PHYS rHV
PREDICTION:
FINDINGS:
MORE FINDINGS': NO LPHG TERM PHYSICAL IMPACTS WERE PPEOICTED OR DISCOVERED
TOLEDO TOLEDO,CITY QF (BAYVISW) LUCAS OH MAUMEE RIVER BASIN 1980 267
ISSUE: PHYS ENV
PREDICTION: THE FILLING OF THE MOORING &ASIM WITH RIVER SEDIMENT FROM CHANNEL DREDGING WILL INCREASE TURBIDITY.
FINDINGS: &PPROXIMITLY 2.5 ACP.FS OF TH?--GORING BASIN WAS FILLED IN, TURBIDITY AROUND PLANT MAS ONLY TEMPORARY
MORE FINDINGS: TURBIDITY NcAR PLANT WAS ONLY TEMPORARY DURING FILLING QF THE MOORING BASIN. NO LONG TERM IMPACTS HAVE
PC-JN lOcNTiFi'jO RIIARDING THI FILLING PF THE MOORING EASIN.
UNIDPCLIS UNIOPOLIS,VILLAGE OF AUGLAIZE OH MAUMEE RIVER BASIN 1977 268
ISSUE: PHYS t-NV
PREDICTION: no IMPHRMFIIT OF LAMOSCAP';.
FlhOIIIC-S: UC IMP1CTS W5K: ?VID?MT.
MORE FINDINGS: no IMPACTS LV^OENT.
WESTON WFSTON,VILLAGE OF woao OH MAUMEE RIVER BASIN 1979 269
ISSUE: PHYS btiv
PREDICTION: NOISE AMD DISRUPTION OF TRAFFIC WILL OCCUR DURING CONSTRUCTION.
FINDINGS? OPERATOR STATED NO IMPACT.
MORE FINDINGS: THE OPTRATQR STATED THAT THERE WAS NO SIGNIFICANT DISRUPTION ASSOCIATED MITH NOISE OR TRAFFIC.
-------
06Aur,E7
CITY
AS PREDICTED TO BETTSR THAN PREDICTED
(8V PIVEP BASIN)
GP.ANTEL COUNTV
ST RIVER BASIN
NEPA(YR)
HESTPN
ISSUE:
PREDICTION:
WOOD
OH MAUMEE RIVER BASIN 1979
WESTON,VILLAGE OF
PHYS EHV
STPECTS AfiD OTHER AREAS WILL BE DISTURBED BUT WILL 9= REPAVEO OP SEEDED AFTER CONSTRUCTION.
OPERATOR STAT?0 NO IMPACT.
270
MORI FINDINGS: TUFRE WAS S^ME DELAY WITH PEPAVING.
THERE WiiPE LCCASICNAL PSOPLEMS C <= SINKING ACROSS ASPH4LT I NATURAL TRENCHES WHICH WERE CORRECTED.
NO PPEScNT PROBLEMS EXIST.
FILLMORE
MN UPPER MISSISSIPPI
1981
271
ISSUE:
PREDICTION:
FIMC'INGS:
PUSHFOFD.CITY Cr
PHYJ tNV
4NY AtVERS: IMPACTS OF CONSTRUCTION WILL "E SHORT•TERM.EPOS ION CONTROLS WILL BE IMPL.AFTER CONSTRUCTN
NO EVIDENCE TF EROSION AT SITE. STORM WATEP PONO FOR FLOOD CONTROL ADJACENT TO NEW PLANT ACROSS DITCH.
PLANT flPP^IU'S NOT TO HAVE ADVERSE EFFECT ON DIKE. SLUDGE STILL SPREAD AT MUNICIPAL AIRPORT.
OLD PLANT STILL NOT DEMOLISHED. CITY MAY TEAR DOWN SOON. OLD FARM BUILDINGS ALSO STILL ADJACENT SITE.
PORE FINDINGS: ALL EXCAVATION FCR SEWER EXTENSIONS FECLNTLY BESIDE ROADS. NO EVIDENCE OF DRAINAGE/EROSION PROBLEMS
OLD BUILDINGS (SEWAGE PLANT t FARM) NOT YZT TORN CCWN. CITY MAY FIND NEW SLUOGE SITE IF BIROS
TO AIRPORT BY SLUDGE SPREADING THERE. ACTUAL SITE WELL MAINTAINED t ATTRACTIVE.
272
ALMA
ISSUE:
PfirOKTJCN:
FINDINGS:
ALMA "UN 1C I PAL WASTEWfTFR T9MT PLT BUFFALO WI UPPER MISSISSIPPI
• PHYS INV
TH:tE WILL t:i T^MPORAPY IMPACTS RESULTING FSOM CONSTRUCTION.
THERE APE NC G^SEPVAPLE IMPACTS ASSOCIATED WITH THE PROJECT.
IMPACTS THAT DID OCCUR W2»E T£MPORARY.
1980
MORE FINDINGS: SHORT-T-PM IMPACTS TO THE PHYSICAL ENVIRONMENT OCCURRCD AS A RESULT OF CONSTRUCTION.
NO OTMT.& I»'PBCTS WEPC OBSc'VEC.
AUGUSTA
issu::
PREDICTION:
FINDINGS:
5AU CLAIPE;
WI UPPcR MISSISSIPPI 1977
AUl,USU,C!TY Of
PHYS c'lV
SHORT Tt'RM HQISE.DUST, I TRAFFIC.THE STRFAM WILL NCT B5 AFFECTED BV CONSTRUCTION ACTIVITIES.
THERE WERE NO ADVISE CONSTRUCTION IMPACTS.
273
MORE FINDINGS: THE SIT- IS GfMSSEO WITH NO EROSION PROBLEMS.THE PLANT IS NOT CONSPICUOUS. NO IMPACT ON THE PHYS. ENV.
6ANGOR
ISSUE:
PREDICTION:
FINDINGS:
LACROSSE
WI UPPER MISSISSIPPI
1973
274
('ANGOr .VILLAGE C*
PHYS HIV/SOIL:
PtMQvAL OF VEGETATION MAY RESULT IN SOME EROSION OF SOIL IN THE AREA. TEMPORARY EFFECT
STRAW WAS LAID ON SLOPc AWAY FROM CONSTRUCTION SIT1: TO PR5VFNT EROSION. NO EVIDENCE OF EROSION NOW.
MORE FINDINGS: NO EVIDENCE OF FAST EROSION. MITIGATED BY LAYING STRAW DURING CONSTRUCTION.RUNOFF PREVENTED NOW BY A
STORM POND
BIRCHWOOO
ISSUE:
PREDICTION:
DIP.CHWCOOiVlLLAGE CF
PHYS HIV
WASHBURN
WI UPPER MISSISSIPPI
1982
275
-------
06AUG87
AS PPEDTCTEO TC SETTER THAN PREDICTED
CdY ?!VtR BASIN)
CITT GPANTEE COUNTY ST RIVER BASIN
FINDINGS: MINIMAL NCISE FPOM AERATION-BLOWERS. BUILDING HAS BEEN SOUND INSULATED.
SiTE IS PARTLY SCREENED BY TPEfS ALONG ROAD.
NEAREST RESIDENCE IS ACROSS ROAD.
MORF FINDINGS: NO IMPACT PREDICTIONS MAOE
NEPA(YR)
BRUCE
ISSUE:
pptDICTTON:
RUSK
WI UPPER MISSISSIPPI 1983
276
BPUCE,VILLAGE OF
PHYS ENV
SM1LL AMOUNT OF rOTSIQN I SEDIMENTATION FOR SHORT-T^PM,SLIGHT INCREASE IN NOISE LEVEL
OCCASIONAL SLIGHT INCREASE IN NOISE LEVEL WHEN BLOWERS IN OPERATION,BUT SITE IS REMOTE.
SITE PE&3ASSED WITH NO VISUAL EROSION EVIDENT, OLD BERN MATERIAL USED TO BUILD NEW BERMS.
MORC FINOTNGS: MINIMAL OR no IMPACT ON PHYSICAL ENVIRONMENT oescRvi:o
OPrRATOR PO^S-NT IN 197? (THOUGH 21D NTT WORK AT PLT.) t DID NOT CONFIRM ANY ERODING/SEDIMEN. PROBLEMS
PROBAPLY SCM? CP.OSION OCCURRED AT ACTUAL CONSTRUCTION TIME.
PRUC5
ISSUE:
P320KTION:
FINDINGS:
.IF
RUSK
HPUC",VILLAG:
PHYS LNV/TQPO
AiSTHc.TIC IMPJCT OF THE PROJECT WOULD 3E ONLY MARGINAL
MC HOMES UITHIN 750 FT, TREES FJRM A PARTIAL VISUAL BARRIER.
VISUAL APPrJ'ANCC COMPflT!?LE WITH SURROUNDING AR^fi.
WI UPPER MISSISSIPPI 1980
277
FINDINGS: MC IMPACT CF.
ASHLAND
PUTTEKMUT
ISSIH:
PREDICTION:
FINDINGS:
MOP? FINDINGS: BIDS AMf> 3ttiKi WE^S PISTORSD AS PREDICTED, ALTHOUGH ROUTE WAS REVISED
WI UPPER MISSISSIPPI
1981
L,UTT:C(IUT,VILLAGE i*
PHYS 1NV
ONC CRCJSING JF BUTTERNUT CRK. BEDS AND BANKS OF CRK WILL BE RESTORED TO ORIGINAL CONDITIONS
ii. ia:gM = NT IN FLOODPLAjn IS SPPAP-NT ?=CAUSr NO TRFES
tjUT C7ASI IS GROWING AND C^EER PATH IS UNDISTURBED.
278
WI UPPER MISSISSIPPI
1983
279
C03NCLL COTHELL.CITY OF CHTPP5WA
issue: PHYS LHV
PREDICTION:
FINDINGS: S:MC= TH? P^OJ-:CT WAS AT THE EXISTING SITE THESE WAS LITTL; IMPACT BESIDES SHORT TERM CONSTRUCTION ETC
TH? SEWER LINE F; CH A3ILIT4T ION PROCEEDED WITH NO LONG TERM IMPACT. ROADS,ETC. REPAVED
MORE FINDINGS: THERE wdRz in DISRUPTIONS TO THC PHYSICAL ENVIRONMENT ASSOCIATED WITH THIS PROJECT
CUMBERLAND
ISSUE:
PREDICTION:
FINDINGS:
BARRON
WI UPPER MISSISSIPPI 1978
280
CUMBERLAND,CITt OF
PHYS cNV
SHORT DURATION CONSTRUCTION RELATED IMPACTS.TEMPORARY DISRUPTION OF STREAM BOTTOM BY INTERCEPTOR.
STREAM FLOWING NORMALLY.NO EVIDENCE OF LONG-TERM IMPACT ON THE STREAM.
MORE FINDINGS: VISUAL OBSERVATIONS SHOWED NO LONG-TERM IMPACTS TO TH= STREAM.
-------
C6AUG87
CITY
OE SQTO
ISSUE:
PREDICTION:
AS PREDICTED TO 3ETT5R THAN PREDICTED
(3V RIVER BASIN)
GRANTS COUNTY
ST RIVER BASIN
NEPA(VR)
VERNON/CRAWFORD
WI UPPER MISSISSIPPI 1978
281
GESOTO,VILLAGE TF
PHYS ENV
REMOVAL OF VEGETATION MAY LEAD TO EROSION OF THE SOIL IN THE AREA OF CONSTRUCTION
AREAS OF 5IT= CLEANED ^OR NEW PLANT WERE ALREADY LEVEL. EROSION CONTROL IN PLACE DURING CONSTRUCTION.
PLANT LOCATED ON EXISTING SITE SOUTHWEST OF VILLAGE OF DE SOTO BETWEEN CB»0 TRACKS * MISS
MOKE FINDINGS: NO SIGNIFICANT EROSION PROBLEM OURING OR SINCE CONSTRUCTION
BUFFALO
FOUNTAIN CITY FOUNTAIN CITY,CITY OF
ISiUE: PHYS FUV
PREDICTION: FUGITIVE OUST PARTICLES WILL BE CONTROLLED BY WATER SPRAY APPLICATION
FINDINGS: NO DUST PROBLEMS APPARENT TO OPERATOR: NO COMPLAINTS.
WI UPPER MISSISSIPPI
1979
282
MORE FINDINGS: NO PCC2L:«? WIT" DUST H-.S: INDICATED.
PHILLIES
ISSUE:
PREDICTION:
BINDINGS:
PHILLIPS,CITY OF
"HYS !UV
NO UNUSUAL PHYSICAL IMPACTS NOTICED.
PRICE
WI UPPER MISSISSIPPI 1983
283
MIRE FINDINGS: NO IMPACTS DISCUSSED IN NEPA DOCUMENT
PLUM CITY
ISSUE:
PREDICTION:
FINDINGS:
PLUM CITY,VILLAGE 3F
PHYS '. NV
THERE H;LL BE TEMPORARY IMPACTS TO
PIERCE WI UPPER MISSISSIPPI 1979
\i PHYSICAL ENVIRONMENT AS A RESULT OF CONSTRUCTION.
284
NOR? FINDINGS: SHORT-THRU »MPHCTS TO TH; PHYSICAL ,:NVIRONMENT OCCURRED AS A RESULT OF CONSTRUCTION.
NO CTHER IMPJCTS UERF
STRUM STRUH.VILLAGi OF TRrMPrALEAU
ISSUE: PHYS LMV
PREDICTION: THrRE WILL EF SHORT-TERM DISRUPTIONS DUE TO CONSTRUCTION
FINDINGS: MINOR SHOPT-TcPM DISRUPTIONS DURING CONSTRUCTION.
THS TR^ATMJIlT UNITS ARE ENCLOSED AND THu STT1! IS LANOSCAP50.
WI UPPER MISSISSIPPI
1980
285
MORE FINDINGS: SHORT-TERM IMPACTS TO TH? PHYSICAL ENVIRONMENT OCCURRED AS A RESULT OF CONSTRUCTION
NO UTHER IMPACTS WEPE OBSEPVEO.
WESTBY
ISSUE:
PREDICTION:
FINDINGS:
VcSNGN
WI UPPER MISSISSIPPI 1979
286
WE5TEY ScWAGE TREATMENT PLANT
PHYS CNV
REMOVAL OF VEGETATION MAY LEAD TO EROSION NEAR CONSTRUCTION ESP ON SLOPES WHERE INTERCEPTOR IS BUILT,
NO PTPORTS Or SIGNIFICANT rROS'JN OP GULLYIHG DURING CONSTRUCTION OR SINCE.
-------
TC SETTER THAN PREDICTED
CITV
COUNTY
OF Q^SEKViO CRCSION IMPACTS.
ST RIV5R BASIN
NEPft(TR)
. CITY OF GRATIQT HI SAGINAW RIVER BASIN 1976 Z87
LCUIS
b
FINDINGS:
" StGINSH COUNTY MTP TUSCCLA MI SAGINAW RIVER BASIN 1977 288
ISSUt: PMYi SNV
Pft OKTION:
FIliM'.C-S: HC rntSlCAL -rMVIPONWrNTAL IMPACTS OCSERVCD.
MDf r riioisCS:
CL*CMIV ' GLAOMTILCITT OF ., GLAOMIN MI SAGINAM RIVER BASIN 1976 289
ISSUC: PMYS fNV
pRtoicrrcn: F;VE AOCITICN/IL SLUDGE DPYING PHOS OCCUPYING «,ooo SQUARE FEET WILL BE LOCATED ON EXISTING TREATMENT F
FTnr:»it.s: TMT ? siuont O»YING BEDS ^UILT DUPING THE PLANT EXPANSION ARE NOT B^ING
USrP AT THIS HMT.
HOPE Fiucms:
1, UAKLAMD COUNTY OPH OAKLAND Ml SAGINAM RIVER BASIN 1977 290
issut: PHYS tnv
PPtDICTIJH! T.IT PHYSTC6L JNVIRONM3NT AT AHO AROUND T-1t SITE WILL NOT BE DEGRADED.
rif.ni-iGS: CCNSTRUCTION IMPACTS WERE SHORT-TERM AND APPROPRIATE MITIGATIVE MEASURES WERE
"it:0 INCLUDING FENCING DURING CONSTRUCTION AND RESIDING AND REPLANTING
»FTEP CONSTRUCTION.
FINDINGS:
^^^^«.^—•^^^^^^•^^^^^•.••••»^^^~>^^«>B*^^^OBi^^^lB^^^^^«*^t»^«»M*^^^^^^«»^^«***^^^*IB^^^^^^^^^^
PHTS '•••'EER.CITt OF LAPESR Ml SAGINAW RIVER BASIN 1976 291
PREDICTION: coimoiirT.,,
FINOI»'GS: T"«P««?C ION I*P*»CTS WILL BE TEPPO^APY.
-"^ORARY CONTROLS UStD TO RESTRAIN SOIL EROSION.
MORE FINDINGS:
TJTTABAWASSEE T«P "
E; fWP WHTP SftGINAU MI SAGINAW RIVER BASIN 1979 292
-------
06AUG87
AS PREDICTED TO RfTTirR THAN PREDICTED
(BY RIVEP BASIN)
ST RIVER BASIN
CITY GRANTEE COUNTY
ISSUE: PHYS EtIV
PREDICTION:
FINDINGS: GOOD CONSTRUCTION MGMT AND MITIGATION TECHNIQUES PREVENTED ANY POTENTIAL ADVERSE
IMPACTS FROM OCCURRING.
MOR = FINDINGS:
NEPA(YR)
FORT U»YNt FORT WAYNE,CITY OF (SEWERS) ALLEN IN MAUMEE RIVER BASIN 1980 293
ISSUE! CULTURAL RESOURCE
PREDICTION: NO POSSIBLE EXISTENCE OF ARCHAEOLOGICAL SITES in THE SERVICE AREA.
FINDINGS: NO ARCHAEOLOGICAL SITES OISTURBED.
MORE FINDINGS: ?ALL STATE DID A STUDY AND DIP NCT FIND »NY ARTIFACTS IN THE CONSTRUCTION ZONE.NO HISTORICAL OR ARCHIT
rCTURAL STRUCTURES AFFECTED BY CONSTRUCTION.
MONROEV1LLC MONROfVILLE,5Wi DISPOSAL AUTH ALLEN IN MAUMEE RIVER BASIN 1980 29*
ISSUE: CULTURAL RESOURCE
PREDICTION: THERE ARE NO KNOWN ARCHITECTURAL OR HISTORICAL SITES IN THE AREA
FINDINGS: • NJH£ HF THESE TYPES OF SITES WERE DISTURBED OR W^PP IN THE LINE OF SITE OF CONSTRUCTION
MIR?: FINDINGS: NO IMPACT OH CULTURAL RESOURCES. '••'
ADA iOA i=:WV3? T9E4TKFMT PLANT HflPOIN OH MAUMEE RIVER BASIN 1976 295
ISSUE: CULTU?JL RESOURCE
PREDICTION: NO IMPSCT WILL OCCUR AT EITHER HISTORICAL BUILDING DIRECTLY FROM THE PROJECT.
FINDINGS: NO IMPACT Oh HITHER STRUCTURE OCCURRED FROM CONSTRUCTION.
MOSC FINDINGS: TH= CONSTRUCTION DID NOT DISECTLY AFFECT ADA'S HISTORICAL BUILDINGS
ADA ATA SCWAGE TRCATN?NT PLANT HARDIN OH MAUMEE RIVER BASIN 1976 296
ISSUE: OTHER REC3FAMDN
PREDICTION:
FINDINGS: THE ADA DISPOSAL SITE OF DIRT FROM CONSTRUCTION is USED FOR SLEDDING IN THE WINTER.
MORE FINDINGS: NO SIGNIFICANT IMPACT was PREDICTED OR OCCURRED.SHALL HILL PROVIDES AREA FOR WINTER SLEDDING.
• «»«•<••« •(••.•va>v_
-------
C6AUG37
CITY
AS P^EDIC-TEO TO SETTER THAN PREDICTED
--" nV£R RASIN)
GRANT=c
COUNTY
ST RIVER BASIN
NEPA(VR)
HARROD HARROD.VILLAGE OF ALLEN . OH MAUMEE RIVER BASIN 1977 298
ISSU:: CULTURAL RESOURCE
PREDICTION: no KNOWN HISTORIC OR ACRHAEOLOGICAL SITES WILL BE AFFECTED
FINDINGS: N3 IMPACTS W = R; KNOWN TO HAVE OCCURRED.
MORE BINDINGS: NO-IMPACTS WERE KNOWN TO HAVE OCCURRED. NO KNOWN HISTORIC OR APCHAEOL SITES IN THE AREA.
NAPOLEON NAPOLEON HENRY OH MAUMEE RIVER BASIN 1977 299
ISSUE: CULTURAL RESOURCE
PREDICTION:
FINDiM&s: NO ARCHAEOLOGICAL SITES WERE DISCOVERED.PLANT SETTING WAS REPORTED TO BE FILL AREA.
MORE FINDINGS: NO ARCHAEOLOGICAL OR HISTORICAL SITES WERE IDENTIFIED. .
RIDG2VILLE CORNERS HENRY C OU'IT Y( RIOGEVILLE CORNERS) HENRY OH HAUHEE RIVER BASIN 1976 300
ISSUE: . CULTURftL RESOURCE
PPEDICTION: ' t;o KNUWU HTSTOR.C*L OR CULTURAL SITSS WILL 3? IMPACTED.
FIKOINGSS NO IMfACT. ': .
MOKE FINDINGS:
70LEDO TOLFDO,CITY OF (TEN HILf CRfcK) LUCAS OH NAUME£ RIVER BASIN 1977 301
ISSUE: CULTURiL RriQ'J'CE
PREDICTION:
FTNOINGS:
MORE FINDINGS: NO CULTURAL issues WE?? ADDRFSS^O
TOLEDO TOL=00,CITY OF (3AYVI5W) LUCAS OH MAUMEE RIVER BASIN 1983 302
ISSUE: CULTURAL i^SOURCE
PREDICTION: TH^RE ARE NO KNOWN ARCHA=OLOGICAL RESOURCES IN TH? A^EA OF THE PLANT
FINDINGS: NO KNOWN ARCHAEOLOGICAL SITES.
MORE FINDINGS: ARCHAEQLOGIC»L RFSOURCES MIGHT POSSIBLY EXIST IN THE AREA OF THE PROPOSED RESERVOIR. AS PART OF THE
PROJECT, AN ARCHAEOLOGICAL SURVEY WAS PERFORMED. NO ARCHAEOLOGICAL RESOURCES WERE FOUND.
UNIOPOLIS UNIOPOLIS.VILLAGE UF AUGLAIZE OH MAUMEE RIVER BASIN 1977 303
ISSUE! CULTURAL RESOURCE
PREDICTION:
-------
CITY
FINDINGS:
AS PREDICTED TO BETTER THAN PREDICTED
CEY RIVER BASIN)
GRANTED
COUNTY
ST RIVER BASIN
NEPACYR)
NO EFFECT ON HISTORICAL, ARCHAEOLOGICAL OR CULTURAL VALUES WERE EVIDENT.
MORF FINDINGS: NOT AN issue
WESTON
ISSUE:
PREDICTION:
FINDINGS:
WOOD
OH MAUMEE RIVER BASIN 1979
WESTON,VILLAGE OF
CULTURAL RESOURCE
TH: PROJECT WILL NOT IMPACT HISTORICAL/ARCHAEOLOGICAL SITES.
THERE ARE CURRENTLY NO PROBLEMS WITH ASSOCIATED HISTORICAL/ARCHAEOLOGICAL AREAS.
304
MORF FINDINGS: PREDICTION WAS ACCURATE.
ISSUE:
PREDICTION:
FINDINGS:
FILLMORE
MN UPPER MISSISSIPPI
RUSHFOPO.CITY OF
CULTURAL R=SCU"C':.
THE PROJECT WILL NOT IMPACT ...LOCAL CULTURAL OR HISTORICAL POINTS OF INTEREST
NOTHING OF CULTURAL INTEREST DISCOVERED DURING CONSTRUCTION.
1900
305
MORE FINDINGS: NO IMPACT »PPA'?HT.
«LMA ALMA MUNICIPAL WASTEWATER TRMT PLT BUFFALO
ISSUE: CULTURAL RESOURCE
PREDICTION: no HISTORICAL,CULTURAL OR ARCHAEOLOGICAL SITES WILL BE AFFECTED
FINDINGS: Nl HISTOPICAL,CULTURAL OR ARCHAEOLOGICAL SIT5S WER? AFFECTED.
WI UPP2R MISSISSIPPI
1980
306
FIKOINGS: PREDICTION ws ACCU?AT=.
ALMA
ISSUE:
PREDICTION:
FINDINGS:
ALMA MUNICIPAL WASTCWAT!:R TRMT PLT BUFFALO WI UPPER MISSISSIPPI 1980
PHYS thV/TOPO
AESTHETIC IMPACTS WILL BE MITIGATED THROUGH ENCLOSURE OF THE TREATMENT UNITS AND LANDSCAPING.
NO AESTHETIC IMPACTS HAV5 CCCUPR£0.
307
MORE FIHOTNGS: THE MITIGATION MEASURES WERE IMPLEMENTED. MO ASTHETIC IMPACTS HAVE OCCURRED.
AUGUSTA
ISSUE:
PREDICTION:
FINDINGS:
EAU CLAIRE
WI UPPER MISSISSIPPI 1977
308
AUGUSTA,CITY OF
CULTURAL RFSOURCE
NO KNOWN ARCHEOLOGICAL,HISTORICAL OR SCIENTIFIC SITES WILL BE AFFECTED BY CONSTRUCTION AT THIS SITE.
TH^RE HAW; Bc:N NO CULTURAL IMPACTS.
MORE FINDINGS: TH?RE WERE no CULTURAL IMPACTS AS PREDICTED.
-------
06AUGS7
CITY
AS PREDICTED TO BETTER THAN PREDICTED
(«Y ">mR BASIN)
GRANTEE COUNTY
ST RIVER BASIN
NEPA(TR)
1978 309
BANGOR
ISSUE:
PREDICTION:
FINDINGS:
LACROSSE
(UNGOP,VILLAGE OF
CULTURAL RESOURCE
NO KNOWN ARCHAEOLOGICAL OR HISTORIC REMNANTS THAT NEED TO BE PRESERVED
NO HISTORIC MATERIAL UNEARTHED DURING EXCAVATION.
WI UPPER MISSISSIPPI
MORE FINDINGS: NO ARCHEOLOGICAL OR HISTORICAL MATERIAL AT SITE
BARRDN
ISSUE:
PREDICTION:
FINDINGS:
BARRON.CITY OF 9ARRON
CULTURAL RESOURCE
NO HISTORICAL/ ARCHAEOLOGICAL SITES IN AREA
NO SIGNIFICANT SITES FOUND IN CONSTRUCTION.
WI UPPER MISSISSIPPI
1980
310
MORE FINDINGS: NO SIT~S FOUMO
BIRCHWOOD BIRCHWOOD,VILLAGE ]F WASHBURN
ISSUE: CULTURAL RC-SOURCc
PREDICTION: NO HISTORICAL OR CULTURAL IMPACTS
FINDINGS: • NG ARTIFACTS FOUND OURIN. CONSTRUCTION.
! 4R:A A?OUNO SlU APPEARS TO HAVE-BEEM PREVIOUSLY DISTURBED.
wi UPPER MISSISSIPPI
1982
311
MORE FINDINGS: THE
t HAS NO KNOWN HisTt ARCHAEOLI OR CULTURAL SIGNIFICANCE.
BRUCE
ISSUE:
PREDICTION:
FINDINGS:
RUSK
BPUC?,VILLAGE OF
CULTURAL RESOURCE
NO KNOWN HISTORICAL OR APCH^OLOGICAL SITES WILL 33 AFFECTED
NO HISTORICAL OP ARCHEOLOGICAL SITES FOUND DURING CONSTRUCTION.
WI UPPER MISSISSIPPI
1982
312
MORE FINDINGS: NO IMPACT NCT.-O.
BUTTERNUT
ISSUE:
PREDICTION:
FINDINGS:
BUTT5RHUT,VILLAGE OF ASHLAND
CULTURAL R?SOURCF
NC HISTORiCAL/CULTURAL SITES WILL BE AFFECTED BY THE PROJECT
NO HISTORIC SITES FOUND.
WI UPPER MISSISSIPPI 1981
313
MORE FINDINGS: NO IMPACT CM CULTURAL RESOURCES
CORNELL
ISSUE:
PREDICTION:
FINDINGS;
CORNELL,CITY OF CHIPPEWA
CULTURAL RESOURCE
NO ARCH OR HISTORICAL SITES IN AREA
THERE HAVE BEEN NO IMPACTS ON CULTURAL RESOURCES*
WI UPPER MISSISSIPPI 1980
314
-------
06AUG8T AS PREDICTED TO BETTER THAN PREDICTED
(BY RIVER BASIN)
CITY GRANTED COUNTY ST RIWER BASIN NEPftCYR)
MORE FINDINGS: NO IMPACTS ON CULTURAL RESOURCES SINCE CONSTRUCTION AT AN EXISTING PLANT AND NO NEW SEWER LINES BUILT
OE SOTO D?SOTO,VILLAGE OF V£RNON/CRAWFORD WI UPPER MISSISSIPPI 1978 315
ISSUE: CULTURAL RESOURCE
PREDICTION: NO ARCHAEOLOGICAL, ARCHITECTURAL OR HISTORICAL SITES EXIST AT THE AREA CONSIDERED FOR EXPANSION
FINDINGS: NO SIGNIFICANT SITES OF FIUDS IN VICINITY.
MORE FINDINGS: NO SIGNIFICANT SITES FOUND DURING OR AFTER CONSTRUCTION
FOUNTAIN CITY FOUNTAIN CITY,CITY OF BUFFALO WI UPPER MISSISSIPPI 1979 316
ISSUE: CULTURAL RESOURCE
PREDICTION: THERE «RC NO HISTORICAL OR ARCHAEOLOGICAL SITES IN AREAS AFFECTED BY THE PROJECT.
FINDINGS: NC ARCHAEOLOGICAL OR HISTORICAL SITES.
MORE FINDINGS: NO ARCHAEJL OR HISTORICAL SITES.
——__—••—-—____—__—______ _____________________>.._________•___________—________ _«______>________>___>••«,._____..._.
PHILLIPS ' PHILLIPS,CITY OF ., PRICE WI UPPER MISSISSIPPI 1980 317
ISSUE: CULTURAL RESOURCE "
PREDICTION: NO KNOWN SITCS JF HISTORICAL OR URCHACOLOGICAL SIGNIFICANCE ARE EXPECTED TO BE AFFECTED
FINDINGS: PLANT LOCATrD 4$ 3HOWN IN FNSI. NO CULTURAL OBJECTS AT PLANT SITS.
MORE FINDINGS: NO CULTURAL IMPACTS
PLUM CITY PLUM CITY,VILLAGE OF PIERCE wi UPPER MISSISSIPPI 1979 318
ISSUE: CULTURflL RESOl'PCT
PREDICTION: NO HISTOPKAL,CULTURAL OR »RCHEOLOGICAL SITES EXISTED IN THE PROJECT AREA.
FINDINGS:
MORE FINDINGS: NO IMPACT RESULTED.
SHELL LAKE SHELL LAKE,CITY OF WASHBU°N WI UPPER MISSISSIPPI 1980 319
ISSUE: CULTURAL RESOURCE
PREDICTION: SITE HAS NO PREHISTORIC OR HISTORIC SIGNIFICANCE
FINDINGS: NO CHANGE IN SITE LOCATION SINCE ARCHAEOLOGIST'S REPORT.
MORE FINDINGS: NO CHANGE iu SITE LOCATION. NO HISTORICAL OR ARCHAEOL SITES ARE KNOWN IN THE AREA.
STRUM STRUM,VILLAGE CF TREMPEALEAU WI UPPER MISSISSIPPI 198D 320
-------
C6AUG8T
CITY
issue:
PREDICTION:
FINDINGS:
flS PREDICTED TO BETTER THAN PREDICTED
Cf» KlViK BASIN)
GRANTEc COUNTY
CULTURAL RESOURCE
NO HISTORICAL, CULTURAL OR ARCHAEOLOGICAL SITES MILL BE AFFECTED
NC CULTURAL RESOURCES AFFECTED.
ST RIVER BASIN
NEPA(TR)
MORE FINDINGS: NO HISTORICAL, CULTURAL OR ARCHEOLOGICAL SITES MERE AFFECTED.
STRUM STRUM,VILLAGE OF TREMPfcALEAU WI UPPER MISSISSIPPI 1980 321
ISSUEI OTHEP/RECREdTION
PREDICTION: RECREATIONAL USE OF BUFFALO RIVER MILL NOT BE AFFECTED
FINDINGS: RECREATIONAL USE OF BUFFALO R1V;? NOT 6FFECT50.
MORE FINDINGS: NO IMPACTS TO RECREATION HAVE OCCURRED.
MESTPV MFSTSY sewAGE TREATMENT PLANT VERNON MI UPPER MISSISSIPPI 1979 322
ISSUE: CULTURAL PESOURCE
PREDICTION! NC SIGNIFICANT SITES EFFECTED BY PROPOSED PROJECT.
FINDINGS: STAT? PR?SCPVATIPN PLANNER FINDS NO RECORD OF ANY HISTORICAL OR ARCHAEOLOGICAL FINDINGS IN CONSTRUCTIO
MORE FINDINGS:* NO HISTORICAL os ARCHAEOLOGICAL FINOS AT SITE.
ST. LOUIS ST. LOUIS, CITY OF GRATIOT MI SAGINAM RIVER BASIN 1976 323
ISSUE: CULTURAL RC:OU»CE
PREDICTION:
FINDINGS: NO IMPACTS «*m mm mm, mm, mm *m mm mmt mm *m mm mm mm mm mm, urn ^ mm> mm mm «• mm*m- mmmmmmmm mm mf mm mm. mm-^mmm^mtmM mm mmmmt 9JV ** mm mm mm
DURANO DUR&NO.CITY OF SHIAUASSEc MI SAGINAM RIVER BASIN 1976 325
ISSUE: CULTURAL R^SOUOCE
PREDICTION:
FINDINGS: CONSTRUCTION DIP NOT IMPACT GRAND TRUNK PR STATION.
MORE FINDINGS:
-------
C6AUG8T
C:TY
AS PREDICTED TO BETTER THAN PREDICTED
(fit 3IVEP BASIN)
GRANT?; COUNTY
ST RIVER BASIN
NEPA(YR)
HOLLY OAKLAND COUNTY 0PM OAKLAND HI SAGINAU RIVER BASIN 1977 326
ISSUE: CULTURAL RESOURCE
PREDICTION: PROJECT WILL NOT AFFECT ANY HISTORICAL, CULTURAL! OR ARCHAEOLOGICAL RESOURCES.
FINDINGS: NONE AFFECTED.
MQR; FINDINGS:
HOWELL HOWELL,CITY OF LIVINGSTON HI SAGINAW RIVER BASIN 1976 327
ISSUE: CULTURAL RESOURCE
PREDICTION:
FINDINGS: ONLY KNOWN, HISTORICi SIT= IN AREA IS THE ANN ARBOR RR STATION.
NOT IMPACTED.
MORE FINDINGS:
LAPE'R . LAPFER.CITY OF LAPEER HI SAGINAW RIVER BASIN 1976 328
ISSUE: i CULTURAL 5 = 30U=IC =
PREDICTION: HISTORIC, CULTURAL OR ARCHAEOLIGICAL SITES OR RESOURCES WILL NOT BE AFFECTED.
FINDINGS: LAPEEF COUNTY COURT HOUS? HOT IMPACTED.
MORE FINDINGS:
TITTA6AWASSEE TUP T ITT 4fi AW 1 SS E!: TUP WUTP SAOINAU HI SAGINAW RIVER BASIN 197J 329
ISSUE: CULTURAL RESOURCE
PP.CDICTION: NO CULTURAL R~SOURC£S HILL SE IMPACTED.
FINOINGS: NO IHPACTS CCCUR^^D.
MORE FINOINGS:
FORT WAYNE FORT UAYNF.CITY QF (S'WERS) ALLEN IN HAUHEE RIVER BASIN 1980 330
ISSUE: SOLID WASTt
PREDICTION:
FINPI'IGS: NO CHANG" IN SLUDGE QUALITY OCCURRED BECAUSE OF THIS GRANT.
MORE FINDINGS: NOT AN ISSUE.
• « v « • W V • A V « •••••^•—.•••• • ^ —. — ^^w^*a
-------
C6AUG87
A3 PPEDICT^D TO BETTER THAN PREDICTED
(L'Y RIV;R BASIN)
CITY I,PANT«=.: COUNTY ST RIVER BASIN NEPA(VR)
FINDINGS; SLUDGE HILL NOT BE REMOVED FROM THE POND FOR ABOUT 20 YHARS.SLUDGE FROM THE CLARIFIER MILL STILL BE c
SLUDGE FROM THf CLARIFIiRS WILL STILL BE GIVEN TO FARMERS, AS BEFORE.
MORE FINDINGS: NO IMPACT TO SOLID WAST: PREDICTED OR FELT FROM THIS GRANT.
ADC
ISSUE:
PREDICTION;
FIKDIUGS:
ADA SEWAGE TREATMENT PLANT
SOLIO UASTF/SLUDG;
HARD IN
CH MAUMEE RIVER BASIN 1976
LAUD APPLICATION THROUGH A GIVEAWAY PROGRAM IS USED TO DISPOSE OF SLUDGE
MtTALS IN SLUDGE BELOW STATE GUIOILINeS: NI $<».<. MG/KG;
m 179.9 MG/KG: en zsi MG/KG. SLUDGE voL=96.50o
i- FINDINGS: NJ
WE?: ANTICIPATED AND NONE OCCURRED CONCERNING SLUDGE DISPOSAL.
332
CRTD'P.SVILLE
ISSUE:
PREDICTION:
HOPE FINDINGS:
OH MAUMEE RIVER BASIN 1977
333
Cp:D?RSV:LLE,VILLaOr OF
SULIO WiSTr
4E*AT'_ 3LU?';?, 0»Y RESIDUS IN FILTER BEDS, US; FOR SOIL IMPROVEMENT, AS DONE IN PAST
SLUDG? IS LANO APPLIED AFTER OIGESTcR,SOMETIMES BEPS. SPRAYED FROM TANK TRUCK ONTO AGRICULTURAL LAND
SC^iOu? OALS .VPPLI'D SIMC1; 1983. SLUDGE APPLICATION PROGRAM SUBMITTED TO BOWLING GREEN EPA OFFICE.
SLUCGT; FH-l.o. MCTAL LEVELS Ih MG/KG - C D= 9. 0 , CR = 3« . 9, CU = 1 8 70 , PB *l 8 7. 1 ,NI = 85 , ZN = 2891 ,HG= 1 2
SLUDGE IS L4NC APPLIED TO FARMLAND
A ^ ^ ^ ^ ^ •• ^ ^ ^«» ^ ^ ^ ^ ^ ^ ^^ ^ A* ^^ 4A^ ^ 4A «* •• ^ V
Mft^POD,VILUGE OF
SOLID WAST"
NC SOLIDS UUULO Bl; GENFRATtD.
NC SLUPGT Ii GEM'RATEO.
HARROC
ISSUE:
PREDICTION:
FINDINGS:
ALLEN
OH MAUME: RIVER BASIN 1977
334
MORE FINDINGS: NO SLUDGE PRCDUCEO.
KALIDA
ISSUE:
PREDICTION:
FINDINGS:
KALIDA, VILLAGE HF
SOLID WASTE
G=NEniT=i NO SLUDGE
PUTNAM
OH MAUMEE RIVER BASIN 1976
335
MOPE FINDINGS: NO SOLID WAST; PSUSLEMS OCCUR AND NONE HERE EXPECTED.
NAPOLEON
ISSUE:
PREDICTION:
NAPOLECN
SOLID HASTE
HENRY
OH MAUMEE RIVER BASIN 1977
336
MORE FINDINGS: SLUDGE GENERATION AT THE TREATMENT PLANT was IN THE PAST BEEN USED as FERTILIZER FOR ROW CROPS.THIS
PRACTICE IS STTLL CONTINUING WITH MONITORING OF TH= SLUDGE FIELDS B;ING OOM? BY OHIO EPft.
-------
C6AUG87
CITY
AS PPEDICTiD TC BETTER THAN PREDICTED
RIVER BASIN)
GRANTED
COUNTY
ST RIVER BASIN
NEPA(YR)
RIDGEVILLE CORNERS HrMRY COUNTY
-------
06AUC87
AS PREDICTED TO BETTER THAN PREDICTED
COY RIVEP BASIN)
ST RIVER BASIN
NEP»CTR)
CITY GP ANTS'. COUNTY
APPLICATION IS UNDER THE DIRECTION OF A STATE PROGRAM.
MORE FINDINGS: ISSUE NUT ADEQUATELY ADDRESSED ALTHOUGH THSRE is NO PROBLEM.LAND APPLICATION AND LANOFILLING OF SLUDGE
EANGOR tANGOP.VILLAGE OF LACROSSE MI UPPER MISSISSIPPI 1978 3*3
ISSUE: SOLID WASTE/SLUDGE
PREDICTION: DRIED SLUDGE COULD BE STOCKPILED ON TH? SITE AND PICKED UP BY AREA FARMERS FOR use on THEIR FIELDS
FINDINGS: SLUDGE is WASTED TMICE PER WEEK, FARMER WITH APPROVED FIELD APPLIES IT MET.
PRYING 8EOS USED ONLY OCCASIONALLY MHEN SLUDGE SPREADING IS IMPOSSIBLE.
MORE FINDINGS: SLUDGE SPREAD AS EXPECTED, BUT NOT USUALLY DPI50 FTRST
BARRON EARRON.CITY OF BARRON MI UPP5R MISSISSIPPI 1980 344
ISSUE: SOLID MAST'S/SLUDGE
PREDICTION: SLUDGE REMOVAL ONCE EVERY FEM YEARS
FINDINGS? NO SLUDGE DISPOSAL AFTER 3 YEARS OF OPERATION.
MORC FINDINGS: IMPACT COPPFCTION PREDICTED
eiRCHHOOD ' PIRCHHOIU.VILLAGH OF -j WASHBUPN MI UPPER MISSISSIPPI 198Z 3*5
ISSUE: SOLID HASTE/SLUDGE
PREDICTION:
FINDINGS: PLANT MILL OXIDIZE MOST SLUDGE IN THE AERATION LAGOON. PERIODICALLY SLUDGE MUST BE REMOVED.NONE YET.
SEcPASE C-LLS WILL REOUIRL.P?RI20IC REMOVAL OP GPOMTH AND SLUDGE.
HORE FINDINGS: LITTLE EXCESS SLUDGE TO B= GENERATED.
BRUC1: BPUC£,VILLAGE OF PUSK MI UPPER MISSISSIPPI 1985 3*6
ISSUE: SOLID HAST5/SLUDG3
PREDICTION:
FINDINGS: SMALL AHOUNT CF SLUOGE ACCUMULATION IN AERATION CELLS HAS NOT NEEDED TO BE REMOVED.
MORE FINDINGS: SLUDGE DISPOSAL HAS NOT BEEN NECESSARY
BUTTERNUT UUTTtPtlUT.VILLAGE OF ASHLAND MI UPPER MISSISSIPPI 1981 347
ISSUE: SOLID HASTE/SLUDGE
PREDICTION: SLUDGE REMOVAL AND DISPOSAL MOULD NOT »E ROUTINELY REQUIRED
FINDINGS: SLUDGE HAS HOT BEEN REMOVED FROM PONDS. IT IS ANAEROBICALLY DIGESTED IN THE PONDS
MORE FINDINGS: NO SLUDGE REMOVAL AND DISPOSAL
^«* ^ ^ ^«fc •• w ^ «• •» • ^^ ^ 4^ ^ ^ t^ ^ ^ •• ^ ^ «V ^ «• ^ ^^ ^ ^ ^^m ^«* «••• «B^ *» ^ ^ ^«» «• •» ^ ^^ «• ^ ••^•^ C3 ^»^» W ^ V3»0n <9^l^ ^B ^ QBO40 «• W ^ ^ ^ *»^»*» ^ •• ^^D ^^^flB ^ ^ m ^f K»^k^9 o» fp Vt) ^ ^» to ^fl»«A^
CORNELL CORNELL,CIT-Y OF CHIPPEMA MI UPPER MISSISSIPPI i960 348
-------
06AUGB7
CITY
ISSUE:
PREDICTION:
FINDINGS:
AS PREDICTED TO BFTTER THAN PREDICTED
(BY RIVER BASIN)
ST RIVER BASIN
NEPA(YR)
GRANTEU COUNTY
SOLID WASTE
SLUDGE HAULLO IN LIQUID FORM TO NEARBY FARMLAND FOR SPREAOING.POSITIVE SECONDARY IMPACTS OF NUTRIENTS.
TWO FARMS WITH SEVEN FIELDS ARE USED FOR SURFACE APPLICATION. 1984-141,900 GALLONS APPLIED.
TH= SLUDG; APPLICATION PROGRAM HAS INCREASED THE PRODUCTIVITY OF ANIMAL FEED CROPS.
MOR? FINDINGS: SLUDGE is DISPOSED OF BY LAND APPLICATION ON LOCAL AGRICULTURAL LAND.EXHIBITS GOOD NUTRIENT VALUE
CUMBERLAND
ISSUE:
PREDICTION:
FINDINGS:
CUMBERLAND,CITY OF
SOLIO WASTF
SLUDGc APPLICATIONS ON FARM LAMO
IN 198*. PLANT DISPOSED OF 719,OJC GAL
BARRON
UI UPPER MISSISSIPPI
1978
3*9
°F SLUDGE ON 350 AC. SLUDGE ANALYSIS PRESENTED IN SUMMARY REPORT
MORE FINDINGS: SLUDGE BEING DISPOSED OF ON LAND
VCRNON/CRAWFORD.
WI UPPER MISSISSIPPI 1978
350
DE SOTO DESOTT,VILLAGE OF
ISSUE: SQLIO WAST"
PREOICTION: IT MAT BECOME NK-SSARY TO FIND A SLUDGE DISPOSAL SITE...EITHER AGRICULTURAL LAND OR PUBLIC LANDFILL
FINDINGS: ALL SLUDGc IS SPREAD ON 1 ACRE PER YEAR, ON 1 FARM WITH 40 ACRES APPROVED SLUDGE SITE.
MORE FINDINGS:* SLUDGE WAS LANIFILLEO UNTIL ISBJ -WHEN o= SQTO SLUDGE SITE WAS APPROVED (VILLAGE LANDFILL WAS CLOSED)
PHILLIPS
ISSUE:
PREDICTION:
FINDINGS:
PRICE
WI UPPER MISSISSIPPI
PHILLIPS,CITY OF
SOLIO WAST-!
SLUDGE DISPOSAL WILL BE ON EXISTING AG'IC. LANDS. IMPACTS TO BE MINIMAL
SLUDGE IS DISPOSED ON 65 ACRES OF FAPM LAND. CROPS OF CORN,HAY AND ALFALFA ARE GROWN.
SLUDGC DISPOSAL RATd BASFO ON NITROGEN AND MFTALS CONTENT.
SLUDGE ANALYSIS P:RFORM=O ANNUALLY, no MAJOR CHANGC IN METALS o* NITROGEN SINCE 1981.
1980
MOPE FINDINGS: SLUDGE DISPOSAL HAS MINIMAL IMPACTS
351
PLUM CITY
ISSUE:
PREDICTION:
FINDINGS:
PLUM CITf,VILLAGE OF
SOLID WASTE
PIERCE
WI UPPER MISSISSIPPI 1979
352
LOCAL FARMERS 4AUL THE SLUOG5 FOR $50 PER 3,000 GAL.THEY INJECT IT INTO CROPLAND AS A CONDITIONER.
THE PR^j=NT PL4NT GENERATES OVtP 50 PERCENT MORE SLUDGE.
TOTAL SOLIDS = 2.2t, TTL N = 3.9T, AMMONIA N = .54?, TTL P = 1.5X, TTL K = .26*, PH = 6.7
MORE FINDINGS: THE PRESENT FACILITY HANDLES SLUDGE MO
-------
06AUG67
AS PREDICTED TO BETTER THAN PREDICTED
(BY RIVER BASI»O
COUNTY
ST RIVER BASIN
NEPACYR)
STPUM
ISSUE:
PREDICTION:
FINDINGS:
TREMPEALEAU
WI UPPER MISSISSIPPI 1980
STRUM.VILLAGE OF
SOLID HASTE
DIGESTED SLUDGE WILL BE DISPOSED OF ON SUITABLE LAND APPLICATION SITES
PRESENTLY, THE CITY PAYS LOCAL FARMERS t2Q PER 31000 GALLONS TO REMOVE THE SLUDGE.
SLUDG3 IS SURFACE APPLIED TO ANIMAL FEED CROPS.
THERE HAS BEEN SOME REDUCTION IN FERTILIZER USE AS A RESULT OF LAND APPLICATION.
MORE FINDINGS: AS 'PREDICTED, SLUDGE is LAND-APPLIED TO CROPLAND
354
ST. LOUIS
J55UE:
PREDICTION:
FINDINGS:
MORE FINDINGS:
GRATIOT
ST. LOUIS, CITY OF
SOLID WASTe
uoc TONS PER DAY OF SLUDGE MILL BE LANOFILLED.
TWUVE ADDITIONAL SLUDGE BEDS W£RE CONSTRUCTED DURING EXPANSION; HOWEVER,
THE SLUDGE IS NCW LAND APPLIED. BEDS NOT USED.
MI SAGINAW RIVER BASIN 1976
355
CASS
ISSUE:
PREDICTION:
FINDINGS:
SACINAW COUNTY WTP
TUSCOLA
MI SAGINAM RIVER BASIN 1977
356
: SOLID WASTE
SLUDGE DISPOSAL IS INJECTED INTO PRIVATc AGRICULTURAL LANDS.
MORE FINDINGS:
OURANO
ISSUE:
PREDICTION:
FINDINGS:
SHlflUflSSFC
MI SAGINAU RIVER BASIN 1976
l/URAf)D,C: TY OF
SOLIO WASTE
POSSIPLE CONTAMINATION TO GROUNDWATfcR 6 ACCUMULATICN OF METALS DUE TO LAND APP.
SLUDEGE IS NOW LANC APPLIED INSTEAD OF LANOFTLLEO AS WAS PRACTICED
PRIOR TO UPGRADE OF PLANT.
357
MORE FINDINGS: SLUDGE is NOW LAND APPLIED VIA INJECTION TO FARMLAND. WAS LANDFILLEO PREVIOUSLY
MONITORING SHOWS NO IMPACTS TO GROUNOWAT^R OR SOTL.
TITTABAWASSEE TUP TITTABAWASSEE TWP WWTP
ISSUE: SOLID WAST?
PREDICTION: NO IMPBCT SHOULD OCCUR.
FINDINGS: NO IMPACT FOUND.
SAGINAW
MI SAGINAU RIVER BASIN 1979
358
MORE FINDINGS:
ADA
ISSUE:
PREDICTION?
ADA S6W1GE TREATMENT PLANT
=N=RGY
HMF0IN
OH MAUMEE RIVER BASIN 1976
359
-------
06AUG87 AS PREDICTED TO SETTER THAN PREDICTED
(BY RIVER BASIN)
CITY GRANTEE COUNTY
FINDINGS: EL:CTRIC osr: is «Ti,496KWH PSR YEAR a «i6,595.63.
ST RIVER BASIN
NEPA(YR)
MORE FINDINGS: NO PREDICTION WAS HADE ABOUT ELECTRIC USE. THE INCREASE WAS NOT SIGNIFICANT ACCORDING TO THE CITT.
CRIC^RSWILLE CRIOcRSVILLE.VItLAGE OF AUGLIAIZE OH NAUHEE RIVER BASIN 1977 360
ISSUE: ENERGY
PREDICTION:
•FINDINGS: POWER USACF PROPPED BY 1/3 FROM OLD PLAUT
MORE FINDINGS: POWER USAGE 1/3 L=SS THAN THAT OF OLD PLANT
NAPOLEON NAPOLFCN HENRY OH NAUMEE RIVER BASIN 1977 361
ISSUE: ENfRGV
PREDICTION:
FINDINGS:
MORE FINDINGS: NO IMPACTS k-n.iRoiNG SNHPGY COMCCRNS w^pr TDENTIFIFO DURING THE SITE VISIT.
TOLEOC TDLtOn-WALBPICGE WOOD CH MAUMEE RIVSR BASIN 1983 362
ISSUE: Ffi = kGY
PREDICTION: THE PFOPOSFD PROJECT REQUIRES NC ENERGY RESOURCES
FINDINGS:
MORF FINDINGS: NO tutPGY R^SOUPC.J HAVE ?EEN IMPACTED DUE TO THE CONSTRUCTION PROJECT.
RUSHFOPD RUSHFO^O.CITY 3F FILLMORE MN UPPER MISSISSIPPI 198j 363
ISSUE: ENKPGY
PREDICTION: ENERGY IMPACTS INCLUDE CONSUMPTION OF FUEL DURING CONSTRUCTION
FINDINGS: CITY ASHIMISTRSTOR SAYS PLANT USES ABOUT SAME AMT OF POWER AS EXPECTED.
NATURAL GAS BACKUP GENERATOR TESTcO OHCc/Wf. 6UT ACTUALLY USED ONLY IN 2 VRS OF PLANT OPERATION.
MORE FINDINGS: £MDRGY use CJV;?ALL ABOUT AS PREDICTED.
ALMA BLMI MUNICIPAL WASTEWATER TPMT PLT BUFFALO wi UPPER MISSISSIPPI 1983 36*
ISSUE: ENERGY
PREDICTION: THE USE OF CHEMICALS AND ENERGY BY THE PLANT WILL HOT AFFECT THE RESOURCES OF THESE MATERIALS.
FINDINGS: ENERGY AND CHEMICALS A»t: UScD FOR NORMAL PLANT OPfcRATION.
MORE FINDINGS: THERE HAS BEFM NO IMPACT TO ENERGY OR CHEMICAL RESOURCES.
-------
P6AUG87 AS PREDICTED TO BETTER THAN PREDICTED
91V£R BASIN)
CITY GRANTEE COUNTY ST RIVER BASIN NEPA(VR)
^^* ** ^ "»^» •» A OB ^ ^ ^ ^»^h ^ M ^ M ^ ^ ^ A ^ ^^ ^ •• ^^ ^^ ^ ^^ ^^^ ^ ^ ^** *• ^ • W^V W «*^ *• tt O» ^ ^ «H*^ W ^ ^^ ^ ^ • ^ ^ 4H^ ^^ ^ ^^B ^^H^^» «»^^ ^B ^ ^ ^ ^W ^* ^ ^ ^* "* ^ ^^fc^
BANGOR eAflGQR, VILLAGE OF LACROSSE HI UPPER MISSISSIPPI 197fl 365
ISSUE: :(I,;RGY
PPEDICTIONS SOME INC9EAS? IN FUiL t POMER COSTS FOR CONSTRUCTON £ OPERATION
FINDINGS: NOV 198<.-OCT 1 3 95 ELECTRICITY BILL FOR PLANT WAS «2343t AT $2.71 NET/KMH t $5.50 NET PER KW DEMAND.
ENERGY USi :S LESS THAN EXPECTEO.
MORE FiriOlNGS: ENERGY USE IS LESS THAN PREDICTED
BUTTcRNUT r»UTTr RIIUTt V ILLAGE OF ASHLAND MI UPPER MISSISSIPPI 1981 366
ISSUE: 5MCRGY
PREDICTION: EU^RGY PEQUIREHSNTS WILL INCREASE
FINDINGS: TWO LIFT STATIONS IN USE. NEW ^NO STATION LIFTS TPiATcD HW TO SEEPAGE CCLLS FROM STAB. PONDS.
MORE FINDINGS: 2 PUMP STATIONS IN use AS PREDICTED
FOUNTAIN CITY FOUNTAIN CITY, CITY OF BUFFALO MI UPPER MISSISSIPPI 1979 367
ISSUES 'HERGV
PREDICTION:
FINDINGS: . GAS BURNER RECYCLES METHANE FROM SLUDGE DIGESTER. SAVE $5000-93200 ON OIL. THEREFORE FUEL CONSUMP CUT,
•'
i>
MORE FINDINGS: MO PREDICTION MAD^.
PLUM CITY PLUH CITY, VILLAGE OF PIERCE MI UPPER MISSISSIPPI 1979 368
ISSUE: ENERGY
PREDICTION:
FINDINGS: EN:RGY AND CHEMICALS APE USED t'4 TH^ ROUTINE OPERATION OF THE PLANT.
HOKC FINDINGS: THF ISSUE OF ENERGY MAS NOT ADDRESSED IN THE FACILITIES PLAN; NO APPARANT PROBLEM NOW.
ENERGY USED DURING NORMAL PLANT OPERATIONS D05S NOT AFFECT THE RESOURCES OF THESE MATERIALS.
^* ^m ^ ^ ^ ^* ** ^ *^ ^ ^ ^ ** ** "* ^ ^m ** ^ ^ ^ ^ ** ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ *^ *• ^ *V *v ^» «V ^ ^ ^ ^v -^ ^ «V •* ^ 4V ^v ^B •• A W ^ ^ ^V ^ •• «• ^ ^ ^* «^ ^» ^ ^V ^* ^ ^»^V ^V ^ ^V ^V V «» M» ^* ^ ^ ^ ^* •* ^ ^* ^* ^ ^ ^ ^ •*
STRUM STRUM, VILLAGE OF TREHPEALEAU Ml UPPER MISSISSIPPI 1980 369
ISSUE: ENFRGY
PREDICTION:
FINDINGS: THE PLANT WAS CONSTRUCTED TQ T/VRE ADVANTAGE OF. GRAVITY FLOWS.
IN ADDITION) METHANE GAS PRODUCED BY THE DIGESTER PROVIDES 40* OF THE PLANTS FUEL.
MORE FINDINGS: THERE HAS BEEN NO IMPACT TO ENERGY OP CHEMICAL RESOURCES AS A RESULT OF NORMAL PLANT OPERATION.
CASS SAGINAM COUNTY MTP TUSCOLA HI SAGINAM RIVER BASIN 1977 370
ISSUES EfiSRGY
PREDICTION:
FINDINGS: SAVINGS HAVE RESULTED FROM THE LAND INJECTION OF SLUDGE MHEN
COMPARED TO LANDFILL ALTERNATIVES.
-------
C6AUG87
CITY
MORS FINDINGS:
AS PREDICTED 'TO 3FTTER THAN PREDICTED
Cl'T RIVER 6ASIN)
GRANT?; COUNTY
ST RIVER BASIN
NEPACYR)
DURAMO DURANO.CITY OF SHIAUASSEE MI SAGINAM RIVER BASIN 1976 371
ISSUE! ENERGY
PREDICTION:
FltlOIMGS: ENCRGY USAGE HAS BEEN REDUCED SINCE THE SLUDGE CONDITIONING UNIT HAS NOT BEEN IN
US'.
MORE FINDINGS:
FORT UAYNE FOU W«VN?,CITY OF ALLEN IN MAUMEE RIVER BASIN 1980 372
ISSUE: AIR QUALITY
PREDICTION: AIP QUALITY SHOULD NOT BE ADVERSELY AFFECTHD BY THIS PROJECT EXCEPT FOR SHORT TERM NOISE AND DUST.
FINDINGS: NO ADVERSE AIR DUALITY EXISTS OuE TO CONSTRUCTION.DUST REDUCTION CHEMICALS WERE USED TO KEEP OUST OUT
MOPE FINDINGS: OUST CONTROL MEASURES WER.= FMPLJVED DURING CONSTRUCTION. NO AIR QUALITY PROBLEMS EXIST.
MONROEVI1L? MDNSOFVILLHtSUG DISPOSAL AUtM ALLEN IN MAUMEE RIVER BASIN 1980 373
ISSUE: AIR QUALITY
PREDICTION: MITIGATING CONTROL MEASURES INCLUDE OOOR CONTROL
FINDINGS: NO AIR DUALITY CHANGES HAV? HAPPENED SINCE THE CONSTRUCTION.
MORE FINDINGS: OUST WAS CONTR1LLOED THROUGH PROMPT RESEEOING .AIR QUALITY HAS NOT BEEN A PROBLEM SINCE CONSTRUCTION M
»S bEGUfl
CRIDER3VILLc C" I 0?(>3V ILLF , V ILL AGE CF AUGLIAIZE OH MAUMEE RIVER BASIN 1977 374
ISSUE: AI9 QUALITY
PREDICTION: NO OOOP p«r>3Ljns AR- EXPECTED
FINDINGS: ODOR PROBLEMS ONLY WHEN PLANT n SHUT DOWN TO PREVENT SOLIDS LOSS.
MOR= FINDINGS: ODOR PROBLEMS ONLY IF PLANT is SHUT DOWN.
• ^•— ——•••————•-•— — — — —•• — ——»—————*—-• «-— —— — ——— — •—••——••—•.— « .*.«..*«« .A._.....«VM.V. ~MM* •_ _«•.»».«•«•—•-———— — • •»-• —
HARROO H4RROn,VILL4G? OF ALLEN OH MAUMEE RIVER BASIN 1977 375
ISSUE: AIR QUALITY
PREDICTION: ODORS FROM SEPTIC TANK OISCHARG= SHOULD a= ELIMINATED.
FIHOIN&S: NO ooo^s FPOM PLANT OR STREAM.
MORE FINDINGS: NO ODORS PRSSZNT
KALIDA KALIDA,VILLAGE OF PUTNAM OH MAUMEE RIVER BASIN 1976 376
-------
06AUG87
CITY
ISSUE:
PREDICTION:
FINDINGS:
AS PREDICTED TO BETTER THAN PREDICTED
(BY RIVER BASIN)
COUNTY ST RIVER BASIN
NO AIR QUALITY PROBLEMS NOTED FROM ANY SOURCE. MO ODORS NOTED.
GRANTEE
AIR QUALITY
NEPAtYR)
MORE FINDINGS: NO IMPACTS ON AIR QUALITY MERE EXPECTED AND NONE OCCURRED.
MONTPELIER
ISSUE:
PREDICTION:
FINDINGS:
WILLIAMS
OH MAUMEE RIVER BASIN 1980
37T
MONTPELIER SUG TRT PLT
AIR QUALITY
OOORS ASSOC U/OUMP STATIONS UILL Pt MINIMIZED BY PROPER LOCATION, DESIGN, I MAINTENANCE OF FACILITIES
THERE ARE NO ODOR PROBLEMS ASSOCIATED WITH THE PUMP STATION OR THE REST OF THE FACILITY.
MORE FINDINGS: AS NO ODOR PROBLEM EXISTS, THIS is NOT AN ISSUE
NAPOLEON
ISSUE:
PREDICTION:
FINDINGS:
NAPOLEON
*IR QUALITY
HENRY
OH MAUHEE RIVER BASIN 197T
378
AIR QUALITY WAS NUT A CONCERN TO BE CONSIDERED DURING PROJECT
CONSTRUCTION. THERE APPEARS TO BE NO ADVERSE IMPACTS ON LOCAL AIR QUALITY.
MORE FINDINGS: AIR QUALITY WAS NOT AN ISSUE TO BE CONSIDERED DURING PROJECT CONSTRUCTION.THERE APPEAR TO BE NO
ADVERSc IMPACTS ON LOCAL AIR QUALITY.
RIOGEVILLE CORNERS HENRY COUNTY(RIOGEVILLE CORNERS) HENRY
OH MAUMEE RIVER BASIN 1976
379
ISSUE: AIR QUALITY
PREDICTION: ADVERSE EFFECTS FROM TH= FACILITY TO AMBIENT AIR WOULD BE NEGLIGIBLE^ ODORS WOULD BE MINIMAL)
FINDINGS: THERE ARE NO ODOR PROBLEMS ASSOCIATED WITH THE FACILITY.
THERE ARE NO OTHER ADVERSE EFFECTS WITHIN THE PLANNING AREA EXHIBITED DUE TO THE FACILITY.
MORE FINDINGS: PREDICTION WAS ACCURATF.
TOLEDO
ISSUE:
PREDICTION:
FINDINGS:
TOL?DO-WAL8RinGE
AIR QUALITY
WOOD OH MAUMEE RIVER BASIN 1980
AIR QUALITY IS MONITORED BY THE STATE OF OHIO AND IS CONSIDERED GOOD.
•MO
MORE FINDINGS:
TOLEDO
ISSUE:
PREDICTION;
FINDINGS:
TOLEDO,CITY OF (TFN MILE CRcEK)
AIR QUALITY
INCREASE IN AIR POLLUTION (SHORT TERM)
NO IMPACT APPARENT.
LUCAS
OH HAUMEE RIVER BASIN 1977
381
MORE FINDINGS: AIR POLLUTION CONCFcjigs WERE A SHORT TERM IMPACT.NO EXISTING AIR POLLUTION PROBLEMS HAVE BFEN
-------
06AUG87 AS PREDICTED TO BETTER THAN PREDICTED
CSV RIVER BASIN)
CITY GRANTEE COUNTY ST RIVER BASIN NEPA(YR)
ASSOCIATED WITH THE CONSTRUCTION PROJECT
•»••»«••*«•««•_*••»«»_ _*«•«•_* WM ««••»*••— »•» — — -•*•«•• —-•——•••— «»•»•»••••••» WM A • •••••••» ••»—••••• «•««••••« «»•<• _«»«»•»•*
TOLEDO TOLEDO, CITY OF LUCAS OH MAUMEE RIVER BASIN 1980 382
ISSUE: AIR QUALITY
PREDICTION: AIR QUALITY SHOULD NOT BE IMPACTED BY THE PROPOSED PROJECT
FINDINGS: AIP QUALITY IN TOLEDO HAS NOT IMPROVED DRAMATICALLY. PLANT UPGRADES HAVE REDUCED LOCAL ODOR EMISSIONS.
MOKE FINDINGS: PLANT UPGRADES HAVE NOT AFFECTED THE AMBIENT AIR QUALITY FOR THE CITY OF TOLEDO.
UNIOPOLIS UNIOPOLI5, VILLAGE OF AUGLAIZE OH MAUMEE RIVER BASIN 1977 383
ISSUE: 4IR OUftLlTY
PREDICTION: ELIMINATE ODOR PROBLEMS ASSOCIATED WITH SEPTIC TANKS. NO OTHER AIR QUALITY IMPACTS ARE EXPECTED.
FINDINGS: no ODOR PROBLEMS sxpERitNceo FPOM NEW PLANT.
MORE FINDINGS: NO DOOR PPOEL^S.
WESTON . WrSTQN, VILLAGE OF WOOD OH MAUMEE RIVER BASIN 1979 364
ISSUE: : «:R QUALITY
PREDICTION: OUST WILL occuc DURING CONSTRUCTION.
FINDINGS: OPERATOR STATED NO IMPACT.
MORE FINDINGS: DUST was A PPQSLFM WITH THE INSTALLATION OF SOME CF THE SEWER LINES IN THE COMMUNITY.
THIS wts A $HOPT-T?RM CONSTRUCTION RELATED PERTURBATION, NOT AN ONGOING PROBLEM.
ROCHESTER pccHesTER.ciTv OF OLMSTEO MM UPPER MISSISSIPPI 197R 335
ISSUE: AIR QUALITY
PRLDICTION:
FINDINGS: AIR IN PLANT PASSED THROUGH EITHER W?T OR DRY SCRUBBERS YIELDING
FEWtR ODOR COMPLAINTS FROM THE SURROUNDING PROPERTY OWNERS.
MORE FINDINGS:
RUSHFOPO RUSHFOKD.CITV OF FILLMORE MN UPPER MISSISSIPPI 1980 386
ISSUE: AIR QUALITY
PREDICTION: CHANGE WILL BE POSITIVE WITH REMOVAL OF ANAEROBIC OIG£STION AND ... PERIODIC OFFENSIVE ODORS
FINDINGS: NO UNPLEASANT ODORS FROM NEW FACILITY EVEN TO CLOSEST NEIGHBORS. SLUDGE TANKS COVERED.
MORE FINDINGS: IMPACT ELIMINATION OF UNPLEASANT ODORS FROM OLO PLANT AS EXPECTED » NO OUST COMPLAINTS IN CONSTRUCTION
ALMA MUNICIPAL WASTEWITER TRMT PLT BUFFALO wi UPPER MISSISSIPPI i960 387
AIR QUALITY
PREDICTION: THERE HILL 3£ MINIMAL IMPACT TO AIR QUALITY.
-------
06AUC.8T
CITY
FINDINGS:
AS P?EOICT£0 TO BETTER THAU PREDICTED
cer RIVCR BASIN)
GPANTEc COUNTY
ST RIVER BASIN
NEPACYR)
MORE FINDINGS: AS PREDICTED, MINIMAL IMPACT TO AIR QUALITY OCCURRPO.
EAU CLAIRE
MI UPPER MISSISSIPPI 1977
388
AUGUSTA AUGUSTA,CITY OF
ISSUE: AIR QUALITY
PREDICTION: NO ODOR PROBLEMS WILL RESULT AS LONG AS TREATMENT FACILITIES ARE PROPERLY OPERATED AND MAINTAINED.
FINDINGS: NO OPOR COMPLAINTS HAVE BEEN RECEIVED.NO ODOP.S PERCEIVED DURING PLANT VISIT.
MORE FINDINGS: AIR QUALITY HAS NOT BEEN A PROBLEM AT THIS PLANT.
BANGOP
ISSUE:
PREDICTION:
FINDINGS:
LACROSSE
WI UPPER MISSISSIPPI
1978
389
BANGOR,VILLAGE OF
AIR QUALITY
MECHNICAL SCWAGE TREATMENT FACILITY DOES NOT CRcATF ODOR PROBLEMS...DUST FROM CONSTRUCTION CONTROLLED
NO ODOR PROBLEM. NO OUST PROBLEM DURING CONST SINCE SITE MAS MET t COVERED MITH STRAM ON SLOPE.
NO BURNING NECESSARY t SLUDGE NOT USUALLY DRIED ON SIT? IN WARM.
MORE FINDINGS:. NO AIR QUALITY PROBLEMS MITH NEW PLANT
BARRON
ISSUE:
PREDICTION:
FINDINGS:
TURK3Y FARM ADJACENT TO PLANT, HO NEARBY RESIDENCES.
MORE FINDINGS: SOME OOORS BUT LITTLE IMPACT DUL TO LOCATION.
BARRON,CITY OF BARRON
AIR QUALITY
PLANT 0009 MAY BE OCCASIONAL PROBLEM
CONTINUOUS ODORS F°OM INFLUENT CHAMBER.
MI UPPER MISSISSIPPI
1980
390
BIRCHMOOO
ISSUE:
PREDICTION:
FINDINGS:
BIRCHML.OD,VILLAGE OF MASH3URN
AIR QUALITY
OOORS HILL NOT DEVELOP WHEN PLANT PROPERLY OPERATED.
NO SERIOUS ODORS NOTICED BY OPF3ATOR! N3 COMPLAINTS.
MI UPPER MISSISSIPPI
1982
391
MORE FINDINGS: NO SCRIOUS ODORS.
BRUCE
ISSUE:
PREDICTION:
FINDINGS:
RUSK
MI UPP5R MISSISSIPPI
1980
392
BRUC=,VILLAGc OF
AIR QUALITY
SLIGHT INCRtAiE IN DUST DURING CONSTRUCTION MILL 3= MINIMAL AND SHORT-TERM POTENTIAL FOR ODORS IS LOW
NO KNOWN AIR QUALITY PROSLEMS' REPORTED,NO NOTICEABLE OOORS.
NO AIR QUALITY DATA AVAILABLE.
MORE FINDINGS: no NOTICEABLE ODORS. OUST PROBLEMS MERE SHORT-TEPM
-------
06AUG87
CITt
AS PREDICTED TO BETTER THAN PREDICTED
(BY RIVER BASIN)
GRANTS
COUNTY
ASHLAND
ST RIVER BASIN
MI UPPER MISSISSIPPI
NEPA(VR)
1981 393
BUTTERNUT
ISSUE:
PREDICTION:
BUTTERNUT,VILLAGE OF
1U4LITY
4TICIPATEO I*
NO ODORS NOTICED.
NO*ANTICIPATEO IMPACTS. MINOR ODORS MAY BE EXPERIENCED DURING SPRINGTIME
MORE FINDINGS: NO ODORS NOTICED: NO COMPLAINTS NOTED LOCALLY
CHIPPEWA
UI UPPER MISSISSIPPI
1980
394
CORNELL,CITY OF
ISSUE: SIR QUALITY
PREDICTION: DEVELOPMENT WILL RESULT IN INCREASED TRAFFIC AND THE ASSOC DECREASE IN AIR QUAL ODORS WILL BE MINIMIZE
FINDINGS: THERE is >n ODOR PROBLEM AND THE OPERATOR HAS RECEIVED NO COMPLAINTS.
TH!;RE HAS Bt=N NO GROWTH ASSOCIATED WITH THE PLANT AND THUS NO MORE TRAFFIC TO DEGRADE AIR QUALITY.
MORH FINDINGS: AIR QUALITY HAS«NT BEEN DEGRADED AS PREDICTED.ODORS HAVE BEEN MINIMIZED AT THE PLANT W/NO COMPLAINTS.
CUMBERLAND
ISSUE:
PREDICTION:
FIND INGS:
AIR
CUMV;-L«NO,CITY OP
OARRON
WI UPPER MISSISSIPPI 1978
395
OLD PLANT WAS 4BANOPNHD.NEW PLANT LOCATED IN RURAL AREA.NEW UNIT PROCESSES 00 NOT CAUSE STRONG ODORS.
MORE FINDINGS: 3ETT=R SIT?,BETTER PLANT,FEWFR ODORS,BUT NO PREDICTION MADE
OE SOTO
ISSUE:
PREDICTION:
FINDINGS:
VERHON/CRAWFORO
WI UPPER MISSISSIPPI
1978
396
DCSOTO,VILLAGE OF
AIR QUALITY
CONSTRUCTION...WILL NOT CREATE 300R PR3°LEMS. DUST...OURING CONST WILL BE CONTROLLED BY WATER SPRAT
NO REPORTED «IP QUALITY OR ODOR PROBLEM. R8C t SLUDGE UNITS ALL COVERED.
MORE FINDINGS: NO
FOUNTAIN CITY
ISSUE:
PREDICTION:
FINDINGS:
WI UPPER MISSISSIPPI 1979
397
FOUNTAIN CITY,CITY OF BUFFALO
AIR QUALITY
PROVIDING A 500FT BUFFER ZONE,STANDBY POWER,COVERS AND BYPASSES WILL ALLEVIATE ANY ODOR PROBLEMS
NO PROBLEMS REPORTED WITH ODORS.BUFFER ZONE DOES EXIST.
MORE FINDINGS: NO ODOR PROBLEMS REPORTED.
PLUM CITY
ISSUE:
PREDICTION:
FINDINGS:
PLUM CITY,VILLAGE OF
AI3 QUALITY
TH5R5 WILL d: NJ IMPACT ON AIR QUALITY.
NO IMPACT TQ AIR QUALITY H*S OCCURRED.
PIERCE
WI UPPER MISSISSIPPI 1979
398
THE PLANT DOES NOT HAVE AN ODOR PROBLEM.
-------
C6AU687
CITY
MORE FINDINGS:
AS PREDICTED TO BETTER THAN PREDICTED
CJY RIVER BASIN)
GPANT=£ COUNTY
ST RIVER BASIN
NEPA(VR)
SHELL LAKE
ISSUE:
PREDICTION
FINDINGS:
WASHBURN
SHELL LAKE,CITY OP
AIR QUALITY
SLIGHT INCREASE IN NOIS2. NOISE AND ODOR WILL NOT CAUSE DISCOMFORT.
NOISE CONTROLLED BY SOUND PROOFING IN BLOWER BUILDING.
NO HOUSES CAN BE SEEN FROM SITE.
OOOR NOT cV
MORE FINDINGS: NOISE AND ODOR NOT CAUSING DISCOMFORT.
NO UNDO ODORS; NO COMPLAINTS.
MI UPPER MISSISSIPPI
1980
399
STRUM
ISSUE:
PREDICTION:
FINDINGS:
STRUM,VILLAGE OF
AIR QUALITY
TREMPEALEAU
HI UPPER MISSISSIPPI
1980
400
MORE FINDINGS: NO IMPACT TG AIR QUALITY OCCURRED
WESTBY
ISSUE:
PREDICTION:
FINDINGS: ..
Vil RNON
WI UPPER MISSISSIPPI
19T9
401
W-ST3Y S'iWAGi TREATMENT PL4NT
QUALITY
NO ODOR FROM OPE RATION.BURNING DURING CONSTRUCTION WILL COMPLY WITH AIR POLLUTION REGS. CONTROL OUST.
NO ODOR NOP OUST PROBLEMS S£PORT=D DURING CONSTRUCTION.
FUGITIVE OUST IN C^NST WAS ADEQUATELY CONTROLLED.
MORE FINDINGS: NO AIR QUALITY PROBLEMS OR COMPLAINTS REPORTED OR NOTED.
CASS
ISSUE:
PREDICTION:
FINDINGS:
SAGIN4W COUNTY WTP
AIR QUALITY
TUSCOLA
THE PLAliT EXPANSION HAS NOT RESULTED IN AtlY AIR QUALITY
MI SAGINAH RIVER BASIN 1977
402
MORF. FINDINGS:
HOLLY
ISSUE:
PREDICTION:
FINDINGS:
OAKLAND
MI SAGINAW RIVER BASIN 1977
OAKLAND COUNTY OPW
AIR QUALITY
ODORS ASSOCIATED WITH WWTP CONTROLLED BY ENCLOSING ODOR PRODUCING SEGMENTS OF PLANT.
ODORS CONTROLLED AS PREDICTED.
403
MORE FINDINGS: NO NOTICABLE ODORS FROM PLANT. NO COMPLAINTS FROM COMMUNITY WHICH is DIRECTLY ADJACENT TO PLANT.
IAPEER
LAPEER.CITY OF
LAPEER
MI SAGINAM RIVER BASIN 1976
404
-------
06AUG67
AS PREDICTED TO BETTER THAN PREDICTED
(BY RIVER BASIN)
CITY GRANTEE COUNTY
ISSUE: AIR QUALITY
PREDICTION: NOISE AND ODORS WILL BE LOCALIZED AND MINIMIZED.
FINDINGS: NO IDENTIFIABLE NOISE OR ODOR PROBLEMS EXIST.
ST RIVER BASIN
NEPA(YR)
MORE FINDINGS:
SAGINAU
TITTAEAWASSEE TMP T ITTABAUASSEE TWP WMTP
ISSUE: AIR QUALITY
PREDICTION: ODORS WILL CONTINUE TO OCCUR, SIMILAR TO THOSE FOUND IN PAST YEARS.
FINDINGS: ODORS HAVE 6=tN ELIMINATED SINCE TM = PLANT EXPANSION.
MI SAGINAU RIVER BASIN 1979
405
MORE FINDINGS:
KALIDA
ISSUE:
PREDICTION:
FINDINGS:
KALIDA,VILLAGE OF
OTHEP/fECRrATION
FIJHING OCCURS IN THE OTTOWA RIVER.
PUTNAM
OH MAUMEE RIVER BASIN 1976
406
MORE FINDINGS* RECREATIONAL USES HAVE INCREASED.SLIGHTLY.
MONTPELIER
ISSUE:
PREDICTION:
FINDINGS:
WILLIAMS
OH MAUMEE RIVER BASIN 1980
MCUTPe_LIE7 SWG TRT PLT
3THER/-tCSEATION
RECREATION ARiAS IN THE FftClLITY PLANNING AREA WILL NOT BE AFFECTED BY THE PROPOSED PROJECT.
RECREATION AP'iAS WECF NOT AF*=ECTFD BY PRCJtCT.
407
MORE FINDINGS: PREDICTION w»5 ACCURATE
UESTON
ISSUE:
PFEDICTION:
FINDINGS:
WOOD
OH MAUDES RIVER BASIN 1979
WESTON,VILLAGE OF
OTHEP/SECREATION
TH* PROJECT WILL NOT IMPACT SCENIC RIV'RS OR RECREATIONAL US=S.
PRESENT RHCO^OS INDICATE NO PFOELEMS WITH THE SCENIC RIVERS OR RECREATIONAL AREAS.
408
MORE FINDINGS: PREDICTION WAS ACCURATE.
AUGUSTA
ISSUE:
PREDICTION:
FINDINGS:
AUGUSTA,CITY OF
OTHER/RECREATION
EAU CLAIRE
WI UPPER MISSISSIPPI 1977
AESTHETICS AND RECREATION HAVE IMPROVED AS A RESULT OF DECREASED LOADINGS.
409
WORE FINDINGS: RECREATION W»S NOT ADDRESSED AS AN ISSUE BUT HAS BEEN PERCEIVED TO HAVE IMPROVED BY LOCAL RESIDENTS,
-------
06AUG87
cm
AS PREDICTED TO BETTfcR THAN PREDICTED
(BY PIVEP BASIN)
GRANTEE COUNTY
ST RIVER BASIN
NEPA(YR)
BRUCE
ISSUE:
PREDICTION:
FINDINGS:
RUSK
BPUCE.VILLAGE OF
OTHER/RECREATION
NO AOVTPS- xMPACT ON EXISTING OR FUTURE RECREATIONAL ACTIVITIES
SITE HAS IMPACT ON UATER ACTIVITIES SUCH AS BOATING, FISHING.
NO RECREATIONAL SITES NEA8BY,EKCEPT RIVER.
UI UPPER MISSISSIPPI 1980
MORE FINDINGS: NO NOTICEABLE IMPACTS ON RECREATION
410
CUMBERLAND
ISSUE:
PREDICTION:
FINDINGS:
CUMBERLAND,CITY QP BAR30N
OTHER/RECREATION
TMPRaWFM=NT OF RCCREAT IONAL VALUE OF B=AVER DAM
PLANT MOVED,NEU UNIT PROCESSES.ODOR NOT NOTICED.
IMPROVED MATER QUALITY AT LAKE.
MORE FINDINGS: B-^TT;R
= ,f=;WER OOORS.NO DISCHARGE TO LAKE
UI UPPER MISSISSIPPI
19TB
FOUNTAIN CITY .CITY OF
BUFFALO
WI UPPER MISSISSIPPI 1979
412
FOUNTAIN CITY .
ISSUE: i O
PREDICTION: MERRICK STAT; PAPK HILL NOT BE AFFECTED BY THH PROJECT, NOR WILL THE UPPER MISS FISH t WILDLIFE REFUGE.
FINDINGS: NO CHANGr FROM PREVIOUS CONDITIONS. STATE PARK BORDERS ON WWTP SITE. NO COMPLAINTS RECEIVED.
MORE FINDINGS: NO PROBLEMS R=PO*TrD.NO CH»NGi TRQM PREVIOUS CONDITIONS.
-------
06AUG87
CITY
ROCHESTER
ISSUE:
PReOICTION:
FINDINGS:
MORE FINDINGS:
PREDICTION NOT SUSTAINED
-------
06AUG87
CITY
MOKE FINDINGS:
PPEDICTIUN NOT SUSTAINED
(BY RIVER BASIN)
GRANTEt
COUNTY
ST RIV6R BASIN
NEPA(VR)
CUMPERLAND
ISSUE:
PREDICTION:
FINDINGS:
CUMBERLAND,CITY OF
WETLANDS
BARRON
WI UPPER MISSISSIPPI
1978
419
IMPACTS NOT LONG-TERM BUT CONSTRUCTION DTD OCCUR IN WETLAND.
MORE FINDINGS:
STRUM STRUM,VILLAGE OF TREMP6ALEAU WI UPPER MISSISSIPPI
ISSUE: FLOODPLAINS
PREDICTION: THE DIKES WILL NEED TO BE REPAIRED.
FINDINGS: THE DIKES HAV£ 8E£N REPAIRED.
TH£ PLANT HAS 8EEN SUBJECT TO SPRING FLOODING AND PACKFLOW THROUGH THE OUTFALL.
MORE FINDINGS: THE FLOOD HAZARD WAS NOT COMPLETELY MITIGATED BY THE REPAIR OF THE DIKES
1980
420
MONROEVILLE
ISSUE:
PREDICTION:
FINDINGS:
MORE FINDINGS:
HQN40EVILLE.SUG DISPOSAL AUTH
3IOTA/UR
ALLEN
IN MAUMEE RIVER BASIN 1980
421
DURING WASM WITHER THICK SWARMS OF MIDGE FLIES ENGULF AREA SURROUNDING LAGOON FORCING BUSINESSES TO c
TOWN MORE OR LESS HIRE UNATES.MIDGE FLI'S REPRODUCING IN BRIC-ft-BRAC AROUND NEW LAGOON.
DUCKS,GEESS, AND GREY HERRING INHABIT LAGOON DURING COLD WEATHER.THESE BIRDS WEREN'T HERE BEFORE GRANT
VERY SERIOUS FBQ3LEM HAS ARISEN 95CAUS? OF CONSTRUCTION.MIDGE FLIES DURING WARM WEATHER FORCES STORES
TO CLOSE,ACTIVITY IN TOWN TO DU AND cSTHICS OF TCMN TO OECREASE.TOWN UNABLE TO GET HELP FROM ANYBODY
TO HELP SOLVE PROBLEM.BIRDS IN LAGOOM IN WHITE? HAVE 9FEN NICE BUT ARE EXPECTED IN LAGOON SYSTEMS.
BUTTERNUT
ISSUE:
PREDICTION:
FINDINGS:
ASrtLANO
BUTTCRHUT,VILLAGE OF
8IOTA/TCR
MINIMUM IMPACT ON VEGETATION AND WILDLIFE
FORCE MAIN CONSTRUCTION ROUTE REQUIRED REMOVAL OF TREES.
CONSTRUCTION OF FH AND SEEPAGE CELLS CAUStD RELOCATION OF WILDLIFE.
WILDLIFE ARE RETURNING TO CONSTRUCTION AREA FOR WATER AND FOOD
WI UPPER MISSISSIPPI
1981
422
MOPE FINDINGS: THE EA UNDERESTIMATES TEMPORARY IMPACTS OF CONSTRUCTION
MONROEVILLE
ISSUE:
PREDICTION:
FINDINGS:
MONROEVILLE.SWG DISPOSAL AUTH
SOCIO/SECO?V
ALLEN
ECONOMICS III CITY HAVEN'T CHANGED SINCE CONSTRUCTION
IN MAUMEE RIVER BASIN 1980
423
MORE FINDINGS: ONLY DIFFEPCNCE is THAT CERTAIN SHOPOWNERS ARE FORCED TO CLOSE THEIR SHOPS WHEN MIDGE FLIES GET HEAVY
MONROEVILLE
MONROEVILLE,SWG DISPOSAL AUTH
ALLEN
IN,MAUMEE RIVER BASIN 1980 424
-------
C6AUG87 PPEDICTION NOT SUSTAINED
(BY RIVEP BASIN)
CITY GRANT?"
ISSUE: SOCIO/USERCHG
PREDICTION: ESTIMATED MONTHLY USER CHARGE:*6.oo
FINDINGS: AVERAGE USER CHARGE ABOUT M3.50
COUNTY
ST RIVER BASIN
NEPACYR)
MORE FINDINGS: INCREASt IN USER COSTS WERE ABOUT SGt HIGHER THAN PREDICTED.PREDICTED $6 INCREASE - ACTUALLY *9.00
PER CAPITA INCOM?: LESS THAN (10,000 SO THIS INCREASE IS OVER IT OF THEIR INCOME
ADA
ISSUE:
PREDICTION:
HAROIN
OH MAU1EE RIVER BASIN 1976
ADA SEWAGE TREATMENT PLAHT
SOCIO/POP
POPULATION IN 1980 WOULD GROW TJ 6900.
l'*8l! C^llSUS DATA LISTED POPULATION AT 3669. CITY STATED CURRENT POPULATION AT ABOUT 5003.
425
S FINDINGS: MUCH LESS GROWTH THAN EXPECTED
GOOOHUE
ISSUE:
PREDICTION:
FINDINGS: .
MOPE FIHOINGS:
G03DHUE
G300HUE,CITV OF
SOCIO/POP
POPULATION is EXP:CTED TO GROW AT 4.21 PER YEAR.
I'.RO POPULATION GPOHTH. POPULATION HAS REMAINED STEADY SINCE 1978
AT APPROXIMATELY 65}.
HN UPPER MISSISSIPPI
1982
RUSHFORD
ISSUE:
PREDICTION:
FINDINGS:
MORE FINDINGS:
FILLMORE
MN UPPcR MISSISSIPPI
1983
426
427
RUSHFOPO.CITY OF
SOCIO/POP
PROJECTLO GROWTH RATE 0.41 PER YEAS
ACTUAL US£R3 MiV ALREADY B= OVER 1545 DESIGN POPULATION. NEW DEVELOPMENT WOULD NOT HAVE BEEN POSSIBLE
NEW 0=VCLOPH:NT WOULD NOT HAVE BEEN POSSIBLE WITHOUT UPGRADED TREATMENT CAPABILITY
UNCLEAR IF UPGRADED TREATMENT IS CAUSE OF RAPID POPULATION GROWTH (40 HOUSEHOLDS) SINCE 1984 WHEN OPEN
0.4? PCR YtAR POPULATION BASr.D ON GROWT4 RATE FOR PAST 80 YRS IN FILLMORE COUNTRY. RUSHFORO IS HIGH
GROWTH A
-------
CITY
BIRCHUOOO
ISSUE:
PREDICTION:
FINDINGS:
PRED1CTTUN NOT SUSTAINED
CHV RIV:*1 BASIN)
GRANTS1: COUNTY ST RIVER BASIN NEPA(YR)
PLATTED SINCE PLANT BUILT. 12 HOUSES BUILT, 1 BANK 3UILT ON SEWER EXTENSION. AVG. VALUE OF NEW HOUSES.
HIGHER THAN IN REST OF VILLAGE CTQTAL VALUc $46500C HOUSES t 773000 COMMERCIAL).
WASHSURN
WI UPPER MISSISSIPPI 1982
BIRCHWOOD,VILLAGE OF
SGCIO/USERCilG
HC-NTHLY USER CHARGE MILL EF *12.33. USER CHARGES WILL INCREASE AS A RESULT OF PROJECT.
CHAPGES FO? 1935, WHICH INCLUDES PART OF NEW PLANT COSTS ARE $52.82/QUARTER OR 17.60/HONTH.
430
HCIPf FINPTNGS: USr.R CHARGES MUCH HIGER THAN EXPECTED.
PLUM CITY PLUM CITY,VILLAGE OF PIERCE
ISSUE: SOCIO/USERCHG
PPfcOICTIONS USER CHARGES WILL INCR£ASr: TO Jl? PER MONTH.
FINDINGS: RATES APF CURRENTLY «i5 PES MONTH FOR 266 USEPS.
WI UPPER MISSISSIPPI
1979
431
MORE FINDINGS: RATGS INCREASED BY 3 PERCENT,C.5 PERCENT MORE THAt4 PREDICTED.
STRUrt, VILLAGE jF
STRUM
ISSUE:
PREDICTION:
FItiOItIGS:
MORE FIUOlNGS: >?AT:-$ HIGHER THAU PREDICTED.
TREMPEALEAU
WI UPPER MISSISSIPPI
US?R CHAP&e.i WILL INCPCASE TO «90'.;PE!» Y£AR
CURRENTLY R-T£S 4RE ABOUT SI15.92/YR 0 *13.IO/QTR PLUS *2.99 PER1000 GALLONS OF
WATiP WHE?E AVG HH = 1200J G ALLONS/QUftRT ER .
OP US'^S IS 334 PRLS^MTLY. THIS IS ROUGHLY 93T OF TH£ POPULATION.
1980
WESTBY
ISSUE:
PREDICTION:
FINDINGS:
ri2 TR^ATHtNT PLANT
VF
WI UPPER "1ISSTSSIPPI
1979
432
433
W-:ST3Y
SOCIO/ScC05V
SEWE" EXTj'lilON 9AN WITHOUT UPGSAQ5D TREATMENT. MEW PLANT WILL SERVE ENTIRE CITY .ELIMINATE SEPTIC TANKS
ABOUT 60 -nMrS GOT 3EWER ;XT^NS!ON ANTICIPATING PLANT CONSTRUCTION BUT NO S1G EXTENSIONS SINCE STARTUP
CITY H2S NTT EXTENDED S=W=RS TO ENTIRE PLANNED SEPVICH AREA BECAUSE OF ENGINEERING PROBLEMS.
MORE FINDINGS: SEWcP Sc"VIC= NOT ExTcNO?D TO ENTIRE PLANNED SERVICE AREA SO SEPTIC SYSTEMS CONTINUE IN CITY LIMITS.
CREAME1Y DID MOT JOIN CITY SYST-IM BECAUSE IF COST.
WESTBY
ISSUE:
PREDICTION:
FINOI'IGS:
VE3NON
WI UPP=R MISSISSIPPI
1979
434
WHST3Y SEWAGE TREATMENT PLANT
SOCIO/US^CHG
INCREASc IN RATcS REQUIRED TO FlNAMCH PROJECT WILL AFFECT ALL RESI05NTS.BUT ESP DIFF FOR FIXED INCOME,
iLW;R CHA^Gi 10/15/3* IS $16.42 "£R QUARTER (5/3 « 3/4 IN METER) * «1.71 PER 100 CUBIC FEET OF WATER.
RATES HAVE INCREASED SU9STANTIALLY SINCE THE PLANT WAS BUILT. BASIC QUARTERLY
AND VOLUME CHARGE BOTH RGSE OVER 100^ SINCE Fp WAS COMPLETED.
MORE FINDINGS! ADDITIONAL CHARGES :OR HI&H STR:.NGT4 WASTE AND LARGER MET5PS.
CASS SAGINAW COUNTY WTP TUSCQLA
ISSUE: SOCIO/POP
PREDICTION: POPULATION WOULD GROW AT A RATF. OF zi A YEAPC
MI SAGINAW RIVER BASIN 1977
435
-------
C6AUG87
CITY
FINDINGS:
MORE FINDINGS:
PREDICTION NOT SUSTAINED
(BY RIVER BASIN)
GRANTEC COUNTY
POPULATION DECREASED OVEP THE OBSERVED PERIOD OF TIME,
OUp FOR THE HOST PART TO ECONOMIC FACTORS.
ST RIVER BASIN
NEPACYR)
CASS SAGINAH COUNTY WTP TUSCOLA
ISSUE: SOCIO/USE3CHG
PREDICTION:
FINDINGS: USER RATES HAVE MOB; THAN TRIPLED DUE TO PLANT EXPANSION.
MI SAGINAW RIVER BASIN 1977
436
MORE FINDINGS:
CHESANING
ISSUE:
PREDICTION:
FINDINGS:
MORE FINDINGS:
CHESANING
ISSUE:
PREDICTION:
FINDINGS:
MORE FINDINGS:
CHESANIUG,VILLAGE CF
50C10/P00
SAGINAW
MI SAGINAW RIVER BASIN 1975
437
WWTP DcSIGNED POP AN EQUIVALENT POPULATION OF 10,000. THIS INCLUDES HIGH
BOD AI10 Si L3AOS FROM A OAIRY. POPULATION IS DECREASING SLIGHTLY. THE DAIRY
MOVJO OUT IF TOWN IN 1981. THE EQUIVALENT POPULATION NOW IS AdOUT 2,800.
FACILITY w»3 DESIGNED TO ACCONOOATE A SLIGHT COPULATION INCREASE AND TO TREAT
LCD: POUND: OF eco FROM THE INDUSTRY. THE BOO LOAD FROM THE DAIRY INDUSTRY
WAS GROSSLY UNDERESTIMATED CAUSING PROBLEMS UNTIL THE DAIRY MOVED OUT OF TOWN.
SAGINAU
MI SAGINAW RIVER BASIN 1975
CMESANING.VILLAGH OF
SOCIO/U5ERCHG
USER FEES AND OLM COSTS SHOULD REMAIN RELATIVELY STABLE WITH NOPMAL INCREASES.
U31R FEi.S H\VI INCREASED AT A GREATER BATE THAN PREDICTED. THE OAIRY INDUSTRY
THtT MOVED OUT IN 1981, HAD BEEN PAYING APPROX. *50,000 PER YEAR IN USER FESSo
3U1 COSTS, AFTER THE OAIRY MOVED, WERE SPREAD OUT AMONG THE RESIDENTS.
438
DURAND
ISSUE:
PREDICTION:
FINDINGS:
DUPANP.CITY OF
SHIAMASSEE
MI SAGINAW RIVER BASIN 1976
439
POSSIPLE INDUCED POPULATION GPOWTM.
NC POPULATION GROWTH HAS OCCUPED
MORE FINDINGS: NO INDUCED POPULATION GROWTH. POPULATION is DECLINING.
TITTABAWASSEE TWP
TITTABAWASSEt TWP WWTP
SAGINAW
MI SAGINAW RIVER BASIN 1979
440
ISSUE: SOCIO/USERChG
PREDICTION: WESTCPN SUBDIVISIONS WILL BE HQOKED-UP TO THE EXPANDED WWTP, ON-SITE SYSTEMS WILL BE ABANDONED.
FINDINGS: WESTERN SUBDIVISIONS ARE NOT HOOKEO-L'P TO THE NEW EXPANDED WWTP; CONSEQUENTLY,
THE USER CHARGES HAVE INCREASED DRAMATICALLY (TRIPLED), SEVERAL SUBDIVISIONS
DECLINED SERVICE DUE TO HIGH HOOK-UP COSTS OF *35/LINtAL FT OF FRONTAGE.
MORE FINDINGS: WESTERN SU?OIVISIONS HAVE NOT HOOKED-OP TO THE TOWNSHIPS" CENTRALIZED WWTP
AS PREDICTED. THE PROPcRTY OWNER5 CONSIDcR THE HOOK-UP ASSESSMENT TOO GREAT.
-------
C6AUG87
CITY
PREDICTION NOT SUSTAINED
(BY RIVER BASIN)
COUNTY
ST RIVER BASIN
NEPA(VR)
WESTON
ISSUE:
PREDICTION:
FINDINGS:
MORE FINDINGS
WOOD
OH MAUHEE RIVER BASIN 1979
441
WESTON.VILLAGE OF
AGRICULTURE
ARCQX FIV: ACRES OF LAND ZONED FOR INDUSTRIAL USE WILL BE REQUIRED FOR THE ADDITIONS AT THE UMTP SITE.
TH = ADDITIONS AT THE WMTP ONLY USED UP APPROX. THREE ACRES OF LANO-TME EXPANDED PLANT OCCUP. 5 ACRES.
THE LAND USED FOR THE ADDITIONS WAS THAT ZONED AGRICULTURALi NOT INDUSTRIAL.
TH5 PREDICTION OVEP-FSTIMATED THE AMOUNT OF LAND TO BE TAKEN OUT FOR WWTP USE.
THE PREDICTION WAS INACCURATE.AGRICULTURAL LAND WAS USED TO EXPAND THE SITE.
HONTP5LI5P
ISSUE:
PREDICTION:
FINDINGS:
OH MAUHEE RIVER BASIN 1980
442
MONTP=LIE? SWG TRT PLT WILLIAMS
iCLID WAST?
s-i'JQVATION CF MUNICIPAL TREATMENT PLANT WILL PRIMARILY RESULT IN IMPROVED DISPOSAL OF SLUDGE
A NEW TRUCK HAS BEEN ACQUIRED, BUT IMPROVED SLUDGE DISPOSAL HAS NOT COM? ABOUT FROH PLANT RENOVATIONS.
MORE FINDINGS:
THERE HAVE NOT BEEN RENOVATIONS TO THE TREATMENT PLANT. THE ONLY PROPOSED CHANGE WAS TO BE A NEW COVER
FOR THE SLUDGE DIGESTER, WHICH DID NOT OCCUR. "THE OPERATOR FELT THAT NO NOTICEABLE DIFFERENCE WOULD BE
APPARENT £VEN IF THi COV=P HAD HESN REPLACED. NEVERTHELESS, THIS WAS AN INNACCURATE PREDICTION.
WESTBY
ISSUE:
PREDICTION:
FINDINGS:
MORE FINDINGS:
VERNON
WI UPPER MISSISSIPPI
1979
443
WJTST3Y SiWAGE TREATMENT PLANT
SOLID WASTF
PREDICTED APPLICATION RATE OF 10.4 TONS/ACRE/YR WILL REQUIRE 9 ACRES INITIALLY t SITE LIFE 22 YRS/CORN
SLUDGE CALCULATIONS FOP MEW PLANT DESIGN ASSUMED 4T SOLIDS.ACTUAL SLUDGE HAS ONLY 1.5* SOLIDS.SLUDGE
STORAGE INAPEOUATP. LOW SOLIDS CONCENTRATIONS MEAN MOPE LIQUID OR MORE LAND
MAY NEED LONGc? DRYING PERIOD BSFOPt SPREADING.76 ACRES APPROVED SITES.ACTUALLY USE 19 ACRES.
SLUDOE DISPOSAL REQUIRES MOR<: LAUD THAN PPEDICTED OR HIGHER LIQUID VOLUME »ER ACRE SPREAD.
WESTBY
ISSUE:
PREDICTION:
FINDINGS:
MORE FINDINGS:
WCST9Y SEWAGE TREATMENT PLANT
SOLID WAST=
VEPNON
WI UPPER MISSISSIPPI
1979
444
OPERATOR NO LCNGER ACCEPTS SEPTAGE,HOLDING TANK WASTE,OR .SANITARY LANDFILL LEACHATE.IN PAST,ACCEPTING
SUCH SOLID WASTES UPSCT PLANT FOR UP T3 3 WEEKS, t MADE IT IMPOSSIBLE TO SPREAD SLUDGE ON AG LAND.
TH=R= AF:- STILL MANY SEPTIC SYSTEMS IN PLANNED SFW^R SrRVICH 3RFA.
NO IMP1CT ON LOCAL SOLID HASTE MANAGEMENT SYSTEM WAS PREDICTED,OUT PLANT HAS BEEN TRIED AS PART OF
LARGER SOLID U&ST^ MANAGEMENT SYSTEM WITH UNFORTUNATE RESULTS,I.E. PLANT UPSET.SEPTIC SYSTEMS REMAIN
IN USE WITHIN WEST6Y CITY LIMIT.
GLADWIN
ISSUE:
PREDICTION:
FINDINGS:
MORE FINDINGS:
GLAOWlt;,CITY OF
SOLID HAST?
GLADWIN
MI SAGINAW RIVER BASIN 1976
445
SLUDGE DRYING BIDS WILL R£MAIII AHANOONiD AND LAND APP OF SLUDGE
ON AIRPORT LAND WILL CONTINUE, ADJACENT TO THE AERATED LAGOONS.
LAND APP BEGAN IN 1983.
t
SMELL LAKE
ISSUES
PREDICTION:
FINDINGS:
WASHBURN
WI UPPER MISSISSIPPI 198).
SHELL LAKE,CITY OF
ENERGY
ANNUAL ENERGY C3STS MILL BE $6000 PER YEAR,
1994 ENERGY USE IN PLANT IS «944C> PER YEAR.
PLANT USES' BLOWERS AT HIGH LEVEL TO MAINTAIN AOcOUATE OXYGEN FOR' PROPER TREATMENT.
446
-------
PREDICTION NOT SUSTAINED
(BY PIVE9 BASIS)
06AUG87
CITY GRANTEE COUNTY
WASTEWATER IS PUMPFD TWICE.
MOKE FINDINGS: ENERGY USE is sc PERCENT HIGHER THAN PREDICTED.
ST RIVER BASIN
NEPA(VR)
GLADWIN
ISSUE:
PREDICTION:
FINDINGS:
GLADMIN
MI SAGINAU RIVER BASIN 1976
GLAOWItl.CITY OF
EN'RGY
HHiRCV COSTS WILL BE APpROX t50K/YR AFTER PLANT EXPANSION WITH GRADUAL INCREASES
ENERGY COSTS A9t I91K/YR. A 16X RATE HIKE IN USER FEES WAS STARTED IN 1983.
ANOTHER 7j HIKE is ANTICIPATED IN THE NEAR FUTURE.
447
MORE FINDINGS: BECAUSr THE COST OF ELECTRICITY =>JV. TO UNEXPECTEDLY HIGH RATES, OPERATING
EXPENSES H»V= GONE UP TO COVER THE INCREASED COSTS.
USER FEES HAVE INCREASED 16?.
PHILLIPS
ISSUE:
PREDICTION:
FINDINGS:
MORE FINDINGS:
PHILLIPS,CITY OF
AIR QUALITY
PRICE
WI UPPER MISSISSIPPI
1980
448
FREQUENT OOOP COMPLAINTS FROM NEARBY COMMERCIAL ESTABLISHMENTS AND RESIDENCES.
MAJOR SOURCtS OF ODORS COULD BE OVERLOADED RBC OR POORLY OPFRATED DIGESTER.
PLANT is LOCATED IN AREA OF INDUSTRY AND COMMERCIAL DEVELOPMENT. RESIDENCES LOCATED ACROSS LAKE
-------
C6AUG8T
CITY
CRID:=RSVILLE
ISSUE:
PREDICTION:
FIIIDIUGS:
NO IMPACT CONCERNS
CEY RIVtR 8ASIN)
GRANTED
CRIOcPSVILLE,VILLAGE OF
WATcR QUAL/GROUNO
COUNTY
AUGLIAIZE
ST RIVER BASIN NEPA(YR)
OH MAUMEE RIVER BASIN 1977 449
MOPE FINDINGS:
MCNTFELIER MONTPELIER SWG TRT PLT WILLIAMS OH MAUHEE RIVER BASIN 1980 450
ISSUE: WATER QU«L/G"OUNO
PREDICTION:
FINDINGS:
MORE FINDINGS:
TOLEDO TOL?DO-«AL6RIDGE WOOD OH MAUMEE RIVER BASIN 1980 451
ISSUE: WATEP QU«L/«iFQUIIO
PREDICTION:
FinoiNGS:
MORE FINDINGS: GPQUND WATER ISSUES W=HE NOT AODSCSSEO.
TOLEDO TnL?00,CITY OF (TEN MILE C^?EK) LUCAS OH MAUMEE RIVER BASIN 19TT 452
ISSUE: UATc 1UAL/05QUMO
PPEOICTION:
FIIIDT'IGS:
MORE FINDINGS: GPOUHPUAT=R CONCERNS WERE NOT AN ISSUE
GOOOHUf I.OOOHUC.CITY OF GQQDHUE MM UPPER MISSISSIPPI 1982 453
ISSUE: WATfcP. OUAL/GPOUNO
PREDICTION:
FINDINGS:
MORE FINDINGS:
ROCHESTER ROCHESTER,CITY OF OLMSTED MN UPPER MISSISSIPPI 1978 454
ISSUE: WATER QU4L/GROUND
PREDICTION:'
FINDINGS:
-------
06AUG87
CITY
MORE FINDINGS:
HO IMPACT CONCERNS
CUV 5IVEP BASIN)
GR-JNTE:
COUNTY
ST RIVER BASIN
NEPACfR)
BANGOP r:ANr,Ot?, VILLAGE OF LACROSSE WI UPPER MISSISSIPPI 1978 455
ISSUE: WATLR IJU^L/GPOUNO
PREDICTION:
FINOIN&S:
MORE FINDINGS:
^^» ^^ «•» ^ « ^ ^ ™ • •• ••• ^ A ^ ^*^ ^ ^ ^ ^ ^ o^^ IB ^ ^ ^ llv ^ ^^ ^ ^ ^^^ ^^ ^^ ^^ ^^ ,^ ^^ ^^ ^^ ^ ^^ •• ••• ^ ^^ ^ ^ ^^ ^ ^ •» ^ ^ ^ ^«» •• «A ^^ ^ ^ ^ •• ^ •• ^ mt^ ^ ^^ ^ ^ ^«» ^ ^^^*«i*^^ ^B ^ «A «^^»^ ^ ^^ ^
eiRCHWOOO 9IRCHMOOO,VILLAGE UF WASH^UPN MI UPPER MISSISSIPPI 1982 *56
ISSUE: WAT2R -JUiL/jURPAC?
PREDICTION:
FIHOINGS:
MOR3 FINDINGS:
OE SOTO D:SOTO,VILL»GE OF • VLRNON/CRAWFORD wi UPPER MISSISSIPPI 1978 *57
ISSUE: WJTHR QU»L/opaiJNO
P»EOICTION:
FINDINGS:
MORE FINDINGS:
PHILLIPS PHILLIPS,CITY OF PRICE wi UPP=R MISSISSIPPI 1980 *58
ISSUS: WATiR QU4L/G?OUNO
PPEOICTITN:
FINDINGS:
MORE FINDINGS:
~V*_«.HH____«H_>*..W_._«_««_—_•-»«« —— —• — — ••— — — — — — — — ^—— — — —— — — — — — — * — — — — —. — — »_ — -.„«_»^—»„ — •»— — •,— ••. — — «.—• — — ••• — •••—• —
WESTBY WFSTBY SlWAGi TREATMENT PLANT V53NON HI UPPER MISSISSIPPI 1979 459
ISSUE: MATER QU»L/Gt?QUUO
PREDICTION:
FINDINGS:
MORE FINDINGS:
ST. LOUIS ST. LOUI5, CITY OF GRSTIOT MI SAGINAH RIVER BASIN 1974 460
-------
C6AUG87
CITY
ISSUE:
PREDICTION:
FINDINGS:
NO IHPACT CONCERNS
(BY R1V5R BASIN)
GRANTEE
WATER QUAL/GPOUND
COUNTY
ST RIVER BASIN
NEPA(TR)
E FINDINGS:
BURTON ' GENESSE!: COUNTY (OAVISON SEGMENT) GENESSEE HI SAGINAU RIVER BASIN 1978 461
ISSUE: UATER JUAL/SURFACE
PREDICTION:
FINDINGS:
MORE FINDINGS:
CASS SAGINAU COUNTY WTP TUSCOLA HI SAGINAM RIVER BASIN 19TT 462
ISSUE: MATER QUAL/GROUNO
PPEOICTION:
FINDINGS:
HOP* FINDINGS:1
CHESANING CHESANING,VILLAGE CF SAGINAW HI SAGINAW RIVER BASIN 197S 463
ISSUES WATtR QUAL/GROUHD
PREDICTION:
FINDINGS:
MORE FINDINGS:
RIDGHVILLE CORIIEPS HENRY COUNTV
-------
06AUG87
CITY
NO IMPACT CONCERNS
C8Y RIVtR 8ASIN)
GPANTEE
COUNTY
ST RIVER BASIN
NEPACVR)
MESTON
ISSUE:
PREDICTION:
FINDINGS:
WFSTON,VILLAGE OF
WETLAHDS
WOOD
OH HAUHEE RIVER BASIN 1979 466
MORE FINDINGS: NO.ISSUE PRESENTED IN DOCUMENTATION.
GOODHUE
ISSUE:
PREDICTION:
FINDINGS:
GOGDHUE.CITV OF
WETLANDS
GOODHUE
MN UPPER MISSISSIPPI 1982 467
MORE FINDINGS:
ROCHESTER
ISSUE:
PREDICTION:
FINDINGS:
WETLAHDS
OF
OLMSTED
MN UPPER MISSISSIPPI 1978 468
MORH FINDINGS:
BARRON
ISSUE:
PREDICTION:
FINDINGS:
BARRON,CITY OF
WETLANDS
BAPRON
WI UPPER MISSISSIPPI 1983 469
MORE FINDINGS:
PHILLIPS
ISSUE:
PREDICTION:
FINDINGS:
PHILLIPS,CITY OF
WSTLAUOS
PRICE
WI UPPER MISSISSIPPI 1983 470
MOPE FINDINGS:
SMELL LAKE
ISSUE:
PREDICTION:
SHELL L»K=,C!TY OF
WETLANDS
WASHSURN
WI UPPER MISSISSIPPI 1983 471
-------
C6AUG87
CITY
FINDINGS:
no IMPACT CONCERNS
(EY RIVER BASJN)
GPANTFt
COUNTY
ST RIVER BASIN
NEPA(VR)
MORE FINDINGS? CONSTRUCTION NOT LOCATED IN WETLAND.
WEST8Y
ISSUE:
PREDICTION:
FINDINGS:
WESTBY SEWAGE TREATMENT PLANT
WHTLANPS
VERNON
WI UPPER MISSISSIPPI 1979 472
MOfcE FINDINGS: NOT AH ISSUL.
PURTON
issu::
PREDICTION:
FINDINGS:
COUNTY (DAVISON SEGMENT) GENESSEE
WtTLAHrtS
MI SAGINAU RIVER BASIN 1978 473
MORE FINDINGS:
CHCSANING
ISSUE:
PREDICTION:
CHtSAMI^G,VILLAGE JF
WL-TLANDS
MORE FINDINGS:
SAGINAM
MI SAGINAM RIVER BASIN 1975 474
PURA NO
ISSUE:
PREDICTION:
FINDINGS:
DURAND.CITY OF
WETLANDS
SHIAWASSEE
MI SAGINAU RIVER BASIN 1976 475
MORE FINDINGS:
GLADWIN
ISSUE:
PREDICTION:
FINDINGS!
GLADWIN.CITY OF
WETLANDS
GLAOWIN
MI SAGINAM RIVER BASIN 1976 476
MORF FINDINGS:
-------
06AUG87
CITY
NO IMPACT CONCERNS
(6V RIVSR BASIN)
GRANTEE
COUNTY
LIVINGSTON
ST RIVER 3ASIN NEPA(YR)
MI SAGINAU RIVER BASIN 1976 477
HOWELL
ISSUE:
PREDICTION:
FINDINGS:
HOHELL.CITY OF
WETLANDS
MOPE FINDINGS:
LAPEER
ISSUE:
PREDICTION:
FINDINGS:
LAPEEP.CITY
WETLANDS
LAPEER
SAGINAU RIVER BASIN 1976 478
MORE FINDINGS:
TOLEDO
ISSUE:
PREDICTION: .
FINDINGS:
TOLEDO,CITY OF (T?N MILE CREEK)
. FLOOnPLfllNS
LUCAS
OH MAUHEE RIVER BASIN 1977 479
MORE FINDINGS: FLOODPLAIN was NOT A CONC:SN
WESTON
ISSUE:
PREDICTION:
FINDINGS:
WINSTON,VILLAGE OF
FLOQDPLAINS
WOOD
OH MAUMEE RIVER BASIN 1979 480
? FINDINGS: NO ISSUE P£S;:NTFO IN DOCUMENTATION.
GOODHUE
ISSUE:
PREDICTION:
FINDINGS:
GOODHUt.CITY OF
FLOODPLAtNS
GOQDHUE
MN UPPER MISSISSIPPI 1982 481
MORE FINDINGS:
SHELL LAKE
ISSUE:
PREDICTION:
SHELL LAKE,CITY OF
FLOOnrLAlNS
WASHBURN
WI UPPER MISSISSIPPI 1980 482
-------
C6AUGS7
CITY
NO IMPACT CONCERNS
PIVER BASIN)
COUNTY
FINDINGS: CONSTRUCTION NOT LOCATED IN FLOOOPLAIN
ST RIVER BASIN
NEPA(TR)
MESTBV
ISSUE:
PREDICTION:
FINDINGS:
WESTor SEWAGE TREATMENT PLANT
FLOOOPLAINS
VERNON
MI UPPER MISSISSIPPI 1979 483
MORE FINDINGS: NCT AN ISSUE.
BURTON
ISSUE:
PREDICTION:
FINDINGS:
GEI
-------
06AUG8T
CITt
ISSUE:
PREDICTION:
FINDINGS:
NO IMPACT CONCERNS
(BY RIVcR BASIN)
GRANTEE
COUNTY
BIOTA
ST RIVER BASIN
NEPA(YR)
MORE FINDINGS:
BURTON
ISSUE:
PREOICTI3N:
FINDINGS:
GENESSEE COUNTY (OAVISON SEGMENT) GENESSEE
BIOTA
MI SAGINAU RIVER BASIN 1978 489
MORE FINDINGS:
CHESANING
ISSUE:
PREDICTION:
FINDINGS:
CHESANING.VILLAGE OF
BIOTA
SAGINAW
MI SAGINAW RIVER BASIN 1975 490
MORE FINDINGS:
GLADUIN
ISSUE:
. PREDICTION:
FINDINGS:
BIOTA
GLAOWIh,CITY OF
GLADUIN
MI SAGINAW RIVER BASIN 1976 491
MORE FINDINGS:
HOWELL
ISSUE:
PREDICTION:
FINDINGS:
BIOTA
HOWELL,CITY OF
LIVINGSTON
SAGINAW RIVER BASIN 1976 492
MORE FINDINGS:
ST. LOUIS
ISSUE:
PREDICTION:
FINDINGS:
ST. LOUIS, CITY OF
SOCIO/POP
GR4TIOT
MI SAGINAW RIVER BASIN 1976 493
MORE FINDINGS:
-------
P6AUGS7
CITY
NO IMPACT CONCERNS
(flT PiVtR BASIN)
GFANTEE
COUNTT
ST RIVER BASIN
NEPA(VR)
GOODHUF GODOHUE.CITt Of GOOOHUE MN UPPER MISSISSIPPI 1982 494
ISSUE: AGRICULTURE
PREDICTION:
FINDINGS:
MORE FINDINGS:
POCHESTPR ROCHESTER,CITY OF OLNSTED . MN UPPER MISSISSIPPI 1978 495
ISSUE: AGRICULTURE
PREDICTION:
FINDINGS:
MORE FINDINGS:
ALMA ALMA MUNICIPAL HASTeUATER TRMT PLT BUFFALO WI UPPcR MISSISSIPPI 1980 496
ISSUE: • AGRICULTURE
PREDICTION: !
FINDINGS:
MORE FINDINGS:
ST. LCUIS ST. LOUIS, CITY OF GRATIOT MI SAGINAW RIVER BASIN 1976 497
ISSUE: AGRICULTURF
PREDICTION:
FINDINGS:
MORE FINDINGS:
BURTON GEN6SSE8 COUNTY (DAVISGN SEGMENT) GENESSEE MI SAGINAU RIVER BASIN 197B 498
ISSUE: AGPICULTURr-
PREDICTION:
FINDINGS:
MORE FINDINGS:
CHESANING CHESflNING,VILLAGE OF SAGINAW MI SAGINAM RIVER BASIN 1975 499
ISSUES AGRICULTUR6
PREDICTION:
-------
06AUG87
CITY
FINDINGS:
f<0 IMPACT CONCERNS
-------
06AUG87
NO IMPACT CONCERNS
-------
06AUG3T
NO IMPACT CONCERNS
(BY SlIVcR BASIN)
CITY
MORE FINDINGS:
GRANTEE
COUNTY
ST RIVER BASIN
NEPA(YR)
DURAND DURAMO.CITY 0* SHIAWASSEE MI SAGINAU RIVER BASIN 1976 511
ISSUE: PHYS ENV
PREDICTION:
FINDINGS:
MORE FINDINGS:
KALIOA KALIOA,VILLAGE OF PUTNAM OH MAUMEE RIVER BASIN 1976 512
ISSUE! CULTURAL ^SOURCE
PREDICTION:
FINDINGS:
MORE FINDINGS:
—-i • — —™—--—
MONTPELIER MONTPfLIER SWG TRT PLT '••' WILLIAMS OH MAUMEE RIVER BASIN 1980 513
ISSUE: CULTURAL RCS3URC"
PREDICTION:
FINDINGS:
MORE FINDINGS:
TOLEDO TCLEDO-HAL9RIOGS WOOD OH HAUMEE RIVER BASIN 1980 51*
ISSUE: CULTURSL R^SOU^CI:
PREDICTION:
FINDINGS:
MORE FINDINGS: NO IMPACTS WERE PREDICTED OR OCCURRED.
GOOOHUE GOODHUEtCITY OF GOODHUE MN UPPER MISSISSIPPI 1982 515
ISSUE: CULTURAL RESOURCE
PREDICTION:
FINDINGS:
MORE FINDINGS:
ROCHESTER ROCH^STHR.CITY OF OLMSTSO MN UPPER MISSISSIPPI 1978 si6
-------
06SUG8T
CITY
ISSUE:
PREDICTION:
FINDINGS:
HO IMPACT CONCERNS
(HIT ;VPB
GRANTEE
CULTURAL 3ESOURCF
COUNTY
ST RIVER BASIN
NEPA(VR)
MORE FINDINGS:
CUMBERLAND ' CUMBERLAND,CITY OF BARRON WI UPPER MISSISSIPPI 1979 SIT
ISSUE: CULTURAL RFSOURC5
PREDICTION:
FINDINGS!
MOR; FINDINGS:
BURTON G?llE5S£E CjUUTV CDAVISON SEGMENT) GENESSE? • WI SAGINAU RIVER BASIN 1978 518
ISSUE: CULTURAL RESOURCE
PREDICTION:
FIIIDINGS:
MOPE FINDINGS:
CHESANING CHL-SAMIMG,VILLAGE OF SAGINAW MI SAGINAU RIVER BASIN 197$ 519
ISSUE: CULTURAL 9FSOURC=
PREDICTION:
FINDINGS:
MORE FINDINGS:
GLADW1N GLADWTII.CITV OF GL1DMIN MI SAGINAW RIVER BASIN 1976 520
ISSUE: CULTURAL RESOURCE
PREDICTION:
FINDINGS:
MORE FINDINGS:
TOLEDO TOLEDO-WALBRIDGE WOOD OH MAUMEH RIVER BASIN I960 521
ISSUE: SOLID WASTE
PREDICTION:
FINDINGS:
MORE FINDINGS: SOLID MAST.- issues NOT ADDRESSED
-------
06»UG8T
CITY
NO IMPACT CONCERNS
(BY RIVER BASIN)
GRANTEl
COUNTY
ST RIVER BASIN
NEPA(YR)
TOLEDO
ISSUE:
PREOICTI3N:
FINDINGS:
TOLEDOiCITY OF (TEN MILE CREEK)
SOLID UAST?
LUCAS
OH MAUMEc RIVER BASIN 1977 522
HOPS FINDINGS: NO SOLID UASTS ISSUES UERS ADDRESSED
WESTON
ISSUE:
PREDICTION:
FINDINGS:
UfiSTON,VILLAGE OF
SOLID UAST'
WOOD
OH MAUHEE RIVER BASIN 1979 523
MORE FINDINGS: NO issut PKSS:NT^O IN DOCUMENTATION.
ROCHESTER
ISSUE:
PREDICTION:
FINDINGS:
POCH?STcR,CITY OF
SCLIO UAST?
OLMSTEO
MN UPPER MISSISSIPPI 1978 524
.MORE FINDINGS:
BURTON
ISSUE:
PREDICTION:
FINDINGS:
GFHESSEr COUNTY (OAVISON SEGMENT) GSNESSEc
SOLID WASTE
MI SAGINAU RIVER BASIN 1978 525
MORE FINDINGS:
CHESANING
ISSUE:
PREDICTION:
FINDINGS:
CHESANINGtVILLAGE OF
SOLID UASTF
SAGINAU
MI SAGINAU RIVER BASIN 1975 526
MORE FINDINGS:
HOMELL
ISSUE:
PREDICTION:
HOMELL,CITY OF
SOLID HflSTf
LIVINGSTON
MI SAGINAM RIVPR BASIN 1976 527
-------
C6ftUGt!7
CITY
FINDINGS:
((0 IMPACT CONCERNS
-------
C6AUG87
CITY
NO IMPACT CONCERNS
CJY RIVER BASIN)
GRANTED COUNTY
TOLEDO,CITY OF (TEN MILE CREEK) LUCAS
ST RIVER BASIN NEPA(YR)
OH MAUMEE RIVER BASIN 1977 533
TOLEDO
ISSUE:
PREDICTION:
FINDINGS:
MORE FINDINGS: ENERGY ISSUES MERC NOT ADDRESSED
TOLEDO
ISSUt:
PREDICTION:
TOLEDO,CITY OF (BAYVIEH)
ENERGY
LUCAS
OH MAUHEE RIVER BASIN 1983 534
f: FINDINGS: NOT AN issu:.
UESTON
ISSUE:
PREDICTION:
FINDINGS:
WcSTON,VILLaC.E OF
ENERGY
WOOD
OH MAUMEE RIVER BASIN 1979 535
MORE FINOINCS: NO ISSUE PPES=NTHD IN OOCU»«E NTAT ION.
GOODHUE GOCDHUE.CITV CF
ISSUE: ENERGY
PREDICTION:
FINDINGS:
GOCDHUE
MN UPPSR MISSISSIPPI 1982 536
MORE FINDINGS:
ROCHESTER
'ISSUE:
PREDICTION:
FINDINGS:
ROCHESTER,CITY OF
ENERGY
OLHSTED
HN UPPER MISSISSIPPI 1978 537
MORE FINDINGS:
AUGUSTA AUGUSTA,CITY OF
ISSUE: ENERGY
PREDICTION:
FINDINGS:
EAU CLAIRE
WI UPPER MISSISSIPPI 1977 538
-------
C6AUC87
CITY
NO IMPACT CONCERNS
(PY "JIVE"; 8ASIN)
GRANTEE
FINDINGS:
COUNTt
ST RIVER BASIN
NEPA(TR)
CORNELL CORNELL,CITY OF CHIPPEWA WI UPPER MISSISSIPPI 1980 539
ISSUE: :Nr-Ri-.Y
PREDICTION:
FINDINGS:
HORE FINDINGS:
i
CUMBERLAND .CUM8EPLAN9.CITY OF 9ARRON WI UPPER MISSISSIPPI 1978 5*0
ISSUE: :N!RGY
PPEOICTTON:
FINDINGS:
MOKE FINDINGS:
UEST3Y : WEST3Y S:WiG= TREATMENT PLallT VERNON UI UPPER MISSISSIPPI 1979 541
ISSUE: EN-RGY
PREDICTION:
FINDINGS:
MORE FINDINGS: NOT an issut.
ST. LOUIS ST. LOUIi, CITY OF GR4TIOT MI SAGINAH RIVER BASIN 1976 5*2
ISSUE: ?f,-RGY
PREDICTION:
FINDINGS:
MORE FINDINGS:
BURTON GEIIESSEe COUNTY (OAVISCN S£GMENT) GENESSEE MI SAGINAJ RIVER BASIN 1978 5*3
ISSUE: EK5RGY
PREDICTION:
FINDINGS:
MORE FINDINGS:
CHESANING CH^SAMI'/Q.VILLAG: OF S«GINAW MI SAG^NAU RIVER BASIN 1975 s*«
-------
C6AUG8T
cm
ISSUE:
PREDICTION:
FINDINGS:
NO IMPACT CONCERNS
(BT PIVER BASIN)
SN-.RGY
COUNTY
ST RIVER BASIN
NEPACTR)
MORE FINDINGS:
HOLLY
ISSUE:
PREDICTION:
FINDINGS:
OAKLAND COUNTY 0PM
?NERGY
OAKLAND
MI SAGINAW RIVER BASIN 1977 545
MORE FINDINGS:
HOWELL
ISSUES .
PREDICTION:
FINDINGS:
HOHELLtCITV OF
SNERGY
LIVINGSTON
MI SAGINAW RIVER BASIN 1976 546
MORE FINDINGS:
GOOOHUE
ISSUE:
PREDICTION:
FINDINGS:
GOUDIIUE.CITY OF
AIR OUtLIT*
GOODHUE
MN UPPHR MISSISSIPPI 1982 547
MORE FINDINGS:
ST. LOUIS
ISSUE:
PREDICTION:
FINDINGS:
ST. LOUIS, CITY OF
AIR QUALITY
GRATIOT
Ml SAGINAM RIVER BASIN 1976 548
MORE FINDINGS:
BURTON
ISSUE:
PREDICTION:
FINDINGS:
GENESSEE COUIITY COAVISON SEGMENT) GENESSEE
AIR QUALITY
MI SAGINAM RIVER BASIN 1978 549
MORE FINDINGS:
-------
C6AUG87
CITY
NO IMPACT CONCERNS
-------
"6AUG87
CITY
ADA
ISSUE:
PPED:CT:ON:
FINDINGS:
CONCLUSION NOW MOULD BE PREMATURE
RIV'R 8ASIN)
COUNTY
HAROIN
ADA SEWAG= TREATMENT PLANT
WATER QUAL/GPOUNO
REHABILITATION OF SEHERS WILL PREVENT EXFILTRATION TO GROUND HATER
NO DATA HAS AVAILABLE AFTER REHABILITATION.
NO EVIDENCE OF GROUNDHATER CONTAMINATION NOTED
ST RIVER BASIN NEPA(YR) .
OH MAUMEE RIVER BASIN 1976 555
MOKE FINOIMGS: NO LVIO;MCC OF GPOUNOHATER CONTAMINATION.
HARROC
ISSUE:
PREDICTION:
FINDINGS:
HARPOD,VILLAGE OF ALLEN
WAT^R QUiL/bPOUNO
ELIMINATION 0* INDIVIDUALLY OPERATED SEPTIC TANKS
GRcATLY RiOUCeO POSSI3ILITY OF WELL CONTAMINATION.
OH MAU1EE RIVER BASIN 197T
556
MOPS FINDINGS: "F.DUCi.O POTENTIAL F3R HELL CONTAMINATION.
MONTPELIER
ISSUE:
PREDICTION:
FINDINGS:
MORE FINOIMGS:
WILLIAMS
OH MAUMEE RIVCR BASIN 1980
557
MONTPELISP SHG TRT PLT
WATEP QUAL/SURCACC:
WATcR QUALITY SHOULD IMPROVE FROM DECREASE IN SANITARY POLLUTANTS DISCHARGED
SOMF COMMERCIAL BUSINESSES ARE ON-LINE TO THE HUTP.
THERE «£E STILL MANY INOIVIO. TRrAT. SYS. DIRECTLY DISCHARGING.
TH? PREDICTION H»i STRICTLY QUALITATIVE AND,GEN5RALLY(HATER QUALITY HAS INCR. FROM ADDIT. OF INO. SYS.
THTRE Anc »"J«JY ItlOIV. STILL DISCHARGING WITH ASSOC. PROBLEMS HHICH CAN'T BE EVALUATED M/A QUAL. PREOIC
TOLEDO
ISSUE:
PREDICTION1:
FINDINGS:
MORE FINDINGS!
OF C8AYVi?t.)
LUCA5
OH MAU1EE RIVER BASIN 1982
558
DON PUMi-lS OF HWTP SAID GROUND WAT^R MONITORING NOT OONE AT PLANT.
PLillT [5 JN P.:CLA!MiO LAND. K'rVIN WID'MANt CEPA/P^WLING GREEN, STATED THAT
NO GRODNO WAT'.R MONITORING DONr Iti THi VACINITY OF 5LUOGE App FIELDS.
NO IMPACT APPARENT.
ALMA
ISSUE:
PREDICTION:
FINDINGS:
MI UPPER MISSISSIPPI
1983
559
tll'.A MUNICIPAL WASTEWATER TRHT PLT BUFFALO
WATER QUAL/iURFAC"
THF WATI-R QUALITY OF THE MISSISSIPPI RIVER HILL 9t IMPROVED
1983: :i.FLU.'IT/£FFLUFNT (M'./L): ?OD5: JULY = 41/13, DEC = 114/15, SS: JULY = 62/6, DEC = 113/8.
PLRMIT LIMITS (EXPIRING 1987): BQC5 (MONTHLY AVG) = 3C MG/.L, SS (MONTHLY AVG) = 30 MG/L (0.123 MGO).
MOPE FINDINGS: POLLUTANT LOADING: HAVE DECREASED CONSIDERABLY
AS HATTR QUALITY DATA FOR THE MISSISSIPPI PIV3P ARF NOT AVAILABLE, THE ACCURACY CANNOT BE DETERMINED.
TH= CCNSTRUCTIOH HAS ~UD = IT POSSIBLE *=OR THe PLANT TO MEET ITS REQUIRED PERMIT LIMITS
560
6APRON
ISSUE:
PREDICTION:
FINDINGS:
BARRQN
tARRON.CITY OF
HATER OUAL/OROUND
IMPACTS OH G"OUNDHATFR SHOULD NOT BE SIGNIFICANT OR LASTING.
EXISTING PLANT IS ABANDONED. ALL TREATED EFFLUENT TO GROUNDWATER.
NEW. PLANT MEETS NPD£S LIMITS. HAS BETTER REMOVAL RATFS.
HI UPPER MISSISSIPPI
1980
-------
06AUG87
CONCLUSION NOW WOULD 8 = PPtMATURE
(CY RIVER 3ASIN)
ST RIVER BASIN
CITY GPANTFE COUNTY
GROUNDWATEP USES (JOT AFFECTeD BY SEePAGE CELL DISPOSAL.
MORE FINDINGS: MONITORING PROGRAM INCONCLUSIVE DUE TO LIMITED DATA SINCE 1982.
GROUND WATER NOT SERIOUSLY IMPACTED, BUT LONG TERM IMPACT NOT KNOWN VET.
NEPA(VR)
BRUCE
ISSUE:
PREDICTION:
FINDINGS:
MORE FINDINGS!
RUSK
WI UPP5R MISSISSIPPI
1980
561
,VILLAGE OF
WATER QUAL/GROUNO
EXISTING PRIVATE WELLS WILL REMAIN UNAFFECTED,IMPROVEMENT IN QUALITY OF GROUNDWATER TO CHIPPPEWA RIVER
THE ONLY DATA SET FROM MONITORING WELLS SHOWS SCK HIGHER THAN BASELINE DATA
TO'S,ALKALINITY AND HARONES is LOWER THAN BASELINE DATA.BOO t TSS INTO SEEPAGE CELLS MEETS NPDES LIMITS
NO DPINKING WATER WELL CATA AVAILABLE EXCEPT FECAL CQLIFORM WHICH SHOWS ABSENSE OF FECAL COLIFORM.
GROUNDWATER QUALITY IMPROVED F03 TOS,HARDN3SS,EALKALINITY,BUT DID NOT FOR S04,REMAINED THE SAME FOR N
MONITORING DATA MAY NGT BE REPP; Si ,'ITATI V6 OF GROUNDWATER FROM SEEPAGE CcLL »1 DUE TO WELL LOCATION
LIMITED AND QUESTIONA3LE DATA DO:S NOT ALLOW EVAluATION,EFFLUENT TO SEEPAGE CELLS MEETS NPOES LIMITS.
PRUCF
ISSUE:
PREDICTION:
FINDINGS:
UI UPPcR MISSISSIPPI 1980
BPUC;,VILLAGE OF RUSK
WATER QUAL'SUReAC£
IMPROVEK'-NT In CHIPPEWA RIVER QUALITY OVcR LONG TERM
HO SURFACE WATER QUALITY DATA AVAILABLE. NO BENTHIC STUDIES HAVE BEEN DONE IN 1980'S
562
MORE FINDINGS:
BUTTERNUT
ISSUE:
PREDICTION:
FINDINGS:
EUTTrP-NUT, VILLAGE UF . V ASHLAND
WATLR guaL/G^OUND
NC SIGNIFICANT ADVERSE EFFECTS ON GPOUNDWATE2.
NO D4T4 ON ACTUAL G^OUNDUATEP CONCITIONS
WI UPPER MISSISSIPPI 1981
563
MORE FINDINGS: IMPACT FROM EFFLUENT is UNKNOWN.
COOh VALLEY
ISSUES
PREDICTION
FINDINGS:
VERN3N
WI UPPER MISSISSIPPI 1981
564
COCN VALLEY MUNICIPAL WWTP
WATER QUAL/C-SOUNr!
G30UND«AT=R HAY 92 TEMPORAPILY IMPACTED DURING CONSTRUCTION. SLUDGE DISPOSAL MAY AFFECT GROUNOWATER
NEW LAGOONS AR? STILL SEEPING SINCE CLAY BOTTOMS » SIO^S ARE NOT VET COMPLETELY SATURATED.
JUST SFTER CONSTRUCT EFFLUENT WAS ONLY 37? OF INFLUENT. NOW EFFLUENT UP TO 45000 GPO (75t OF INFLUENT)
IMPACTS ON CW QUALITY UNKNOWN. SLUDGE DISPOSAL PROBLEM FROM OLD PLANT IS GONE. NO LAGOON SLUDGE VET.
MORE FINDINGS: THE ORIGINAL FNSI WAS BASED ON AN pec ALTERNATIVE P.ATHFR THAN THE AERATED LAGOONS THAT WERE BUILT.
E RiSI + FACILITY PLAN ON WHICH IT WAS BASED DID NOT MENTION GROUND WATER
COON VALLrY
ISSUE:
PREDICTION:
FINDINGS:
VERNON
WI UPPER MISSISSIPPI 1981
565
COON VALLEY MUNICIPAL WWTP
WATER QUAL/SURFJCE
DECREASE IN THE EFFLUENT CONCENTRATION TO COON CPEFK. WATER QUALITY WILL BENEFIT.
COHN C^fcEK STILL CLASS III BROWN TROUT STREAM,LOCAL RESIDENTS NOTICE NO RECENT MAJOR CHANGES
NOW CONFORMS TO H/30 LIMITS FOR BOD + SUSPENDED SOLIDS. CHLORINE RESIDUAL UNDER 0.5 MG/L. NO PROBLEMS
MORE FINDINGS: NEW PLANT OPERATES WITH EFFLUENT DISCHARGE WITHIN 30/30 AVG. BOD * SUSPENDED SOLIDS LIMITS. NO MORE BA
D SHOCK LOADS FROM CREAMERY. EFFLUENT ONLY 75? OF INFLUENT BECAUSE PONOS HAVE NOT COMPLETELY STOPPED
Sc'PING, THOUGH THIS IS EXPECTED SOON. SOME PH VIOLATIONS (9.03-9.05J DUE TO ALGAE. INFL 60,000 GPO.
STRUM
STROM,VILLAGE OF
TREMPrSLEAU
WI UPPER MISSISSIPPI 1980
566
-------
06AUG87
CITY
ISSUE:
PREDICTION:
FINDINGS:
CONCLUSION NOM WOULD BE PREMATURE
(BY RIVCR BASIN)
GPANTEE
WATER QUAL/GROUNO'
COUNTY
ST RIVER BASIN
NEPA(VR)
E FINDINGS: NO KNOWN DETERIORATION OF GROUNDWATER QUALITY HAS OCCURRED.
PURTON . GENESSEE COUIITV (DAVISON SEGMENT) GENESSEE MI SAGINAW RIVER BASIN 1978 567
ISSUE: .»*» WATER QUAL/GROUNO
PREDICTION: i IMPROVED GROUNOWATER QUALITY ANO P = DUCC.D MEALTH HAZARDS ASSOCIATED WITH ON SITE SYSTEMS
FINDINGS: AS PREDICTED, NO QUANTIFIABLE INFORMATION PROVIDED.
MOR = FINDINGS: ALL PROPOSED WORK MAS BEEN COMPLETED. ON-SITE SYSTEMS ARE BEING ELIMINATED AS A RESULT OF MOOR-UP TO
SANITARY StWtPS.
DURAMC DURANDiCITY OF 3HIAWASSEE MI SAGINAW RIVER BASIN 1976 568
ISSUE: WATER liUAL/'iROUNO
PREDICTION: :HHANS= WAT;R QUALITY ^Y REMOVING FAILING SEPTIC TANKS IN VERNON TOWNSHIP.
FINDINGS: . NO siwr^ LIII: in V=*NON TOWNSHIP, no BACKGROUND D*TA AVAILABLE.
MOR': FINDINGS:
DURANO . DURAND.CITY CF SHIAWASSEi: MI SAGINAW RIVER BASIN 1976 569
ISSUE: WATdR JlML/SURFACc-
PREDICTION: WATC? QUALITY OF jHiiwassE; PIV-.R CNHANC = D.
FINDINGS: AS PREDICTED. DUALITY OF PLANT EFFLUENT HAS SEEN HMHANCEC DUE TO THE UPGRADING.
BUT RIVCR Ij CONTAMINATEO 8Y UPSTREAM INDUSTRIAL SOURCES OF PCB.
MOR^ FINDINGS: PUNT DISC^A'.tS TO a S-iCTTOH CF THS SHIAHASSEE ^IVE^ WHICH WAS CONTAMINATED
IN THf hASLY 1^7T"S. WATER QUALITY CF PLANT EFFLUENT HAS BEEN IMPROVED.
GLADWIN GLADWftl.CITY OF GLADWiN MI SAGINAW RIVER BASIN 1976 570
ISSUE: WATLR QUAL/GROUND
PREDICTION: ELIMINATION OF GPOUNDWATER CONTAMINATION
FINDINGS: MANY SEPTIC TANKS REMOVED BUT QUALITY OF GROUNDWATER CAM NOT Be QUANTIFIED.
MORE FINDINGS:
HOWELL HOWFLL.CITY OF LIVINGSTON MI SAGINAW RIVER BASIN 1976 571
ISSUE: WATER QUAL/SURFACc
PREDICTION: ENHANCEMENT OF WATER QUALITY IN THE HOWELL AREA
FINDINGS: AS PREDICTED
MORE FINDINGS: TOWNSHIP O^INS TO TH(- SOUTH BRANCH OF THE SIAWASSEE RIVFR.
-------
C6AUG87
CITY
CONCLUSION NOW WOULD BE PREMATURE
CFY RIV2R BASIN)
ST RIVER BASIN
GSANTEL COUNTY
TH? RIVER HERE IS CLASSIFIED AS FULL CONTACT RECREATIONAL.
ALL WORK WAS COMPLETED EXCEPT POR THE NORTH SIDE OF THOMPSON LAKE.
—j.
HPE:<»,CITY OF LAPEER MI SAGINAW RIVER BASIN 1976
WATER iJUAL/GROUNO
HIMINATIJN OF POLLUTION TO GROUNDWATER BY REMOVING SEPTIC TANKS.
NO IMPROVEMENTS MADE. AREA NOT SEWERED AS PLANNED.
NEPA(YR)
LAPEER
ISSUE:
PREDICTION:
FINDINGS:
572
MORE FINDINGS:
TOWNSHIPS WERE NOT SEWERED NOR WERE CITY SEWER LINES REPAIRED AS PROPOSED IN THE PROJECT.
PLANT WAS PERFORMED.
UPGRADE OF
COON VALLEY
ISSUE:
PREDICTION:
FINDINGS:
MOR; FINDINGS;
VERNON
WI UPPER MISSISSIPPI 1981
573
COON VALLEY MUNICIPAL WWTP
FLOCTPLAINS
WILL RF.aui'J FILL oa DIKES TO PROTECT SITE ABOVE TH; REGIONAL FLOOD; FILL WON'T AFFECT FLOOD ELEV.
TH; FUS: W43 3ASCD ON *3C LOCATED AT OLD PLANT SITE IN FLOOCPLAIN. NEW PLANT WAS BUILT UPLAND.
IN DROrP TO &VOIO THE FLOODPLAIN LOCATION. OLD PLANT IN FLOOOPLAIN HAS NOW BEEN ABANDONNEO.THE CURRENT
MIUIMU* ELEVATION OF ACTUAL SIT£ IS ABOVE 9« FT VILLAGE DATUM OR M03E THAN 3 FT OVER FLOOOPLAIN
FN3i was 3A5?a CM sac PLAN TO e^ LOCATED AT FLOOOPLAIN SITE OF OLD PLANT. STATE WOULD NOT APPROVE
ORIGINAL PLA'I WITH FLOOOPLAIN SITE. UPLANC SITE OF NFW PLANT HAD NO NEGATIVE FLOOOPLAIN IMPACTS «•
SLLOW'O OLD CLOUDPLAIN PLANT TO Be ELIMINATED.
TOLEDO
ISSUE:
PREDICTION:
FINDINGS!
TQL=PI,C:TY OF u=n MILE
LUCAS
OH MAUMEE RIVER BASIN 1977
574
MORE FINDINGS:
TOLEDO
issut:
PREDICTION:
FINDINGS:
TOL^OOiC.TY OF C3AYVT7W)
LUCAS
OH NAU^Et RIVER BASIN 1983
575
NONE OF THE CQN5TKUCTION ACTIVITIES AT THH 8AYVIEW PLANT SHOULD HAVE A SIGNIFICANT IMPACT ON BIOTA.
NO riV?SlFICATlON OF FISH SPECIES HAS RcEN NGTFO.NC REPORTS WERE AVAILABLE TO SUPPORT OR REFUTE CLAIM.
MORE FINDINGS: IMPACTS OH PIOTA COULD NOT f- CONFIRMED.
CHIEF ENGINES BELIEVES POSITIVE IMPACT OF PROJECT ON BIOTA.
RUSHFCRD
ISSUE:
PREDICTIONS
FINDINGS:
FILLMOPc
MN UPPER MISSISSIPPI
RUSHFORO.CITY OF
BIOTA/AQUATIC
IMPROVED DISCHARGE TC THE POOT RlVER WILL POTENTIALLY IMPROVE AQUATIC HABITATS.
NO EVALUATION MAO^ AT THIS TIME.
1983
576
MORE FINDINGS:
BRUCE
ISSUES
PREDICTIONS
RUSK
WI UPPER MISSISSIPPI
BRUCE.VILLAGE CF
BIOTA/AQUATIC
IMPROVED WATCR QUALITY WlLL SIGNIF 1CANTLV IMPROVE AQUATIC LIFE IN CHIPPEMA RIVER
1983
577
-------
C6AUG8T
cm
FINDINGS:
CONCLUSION NOW WOULD Bt PRtMATURE
<6T RIVeR BASIN)
GPANTEt COUNTY
NC CURRENT FISH OR BENTMIC SURVEYS CONDUCTED.
ST RIVER BASIN
NEPACVR)
MORE FINDINGS:
COON VALLEY
ISSUE:
PREDICTION:
FINDINGS:
VERNON
WI UPPER MISSISSIPPI
1981
578
COON VALLEY MUNICIPAL WWTP
BIOTA/AQUATIC
TREATMENT SVS WILL BENEFIT WATER QUALITY BUT NOT CHANGE STREAM FROM CLASS III TO CLASS II TROUT STR
II BROWN TROUT STREAM AT PLANT OUTFALL, MO HCTICAPLf CHANGE IN POPULATIONS DUE TO NEW OUTFALL.
MORE FINDINGS: TH? OPERATOR AND STATE AREA ENGINEER NOTE THAT THE ELIMINATION OF EXCESSIVE EFFLUENT LOADS HAS
ELIMINATED EXCESS NUTRIENTS AT OLD SITE. THEY HAVE NOTICED NO DETERIORATION AT NEW OUTFALL.
COON VALLEY
ISSUE:
PREDICTION:
FINDINGS:
VERNON
WI UPPER MISSISSIPPI
1981
579
COON VALLEY MUNICIPAL WWTP
3IOTA/TER
EXISTING SIT? IN LAWN, WILD GRASSES * WEEDS. RESEEDING » LANDSCAPING OF AREA WILL FOLLOW CONSTRUCTION.
ACTUAL SIT? COR NCW PLANT is ON FOTMER CROPLAND.OLD PLANT APANOONNEO BUT SITE NOT YET LANDSCAPED.
WILD GFASSEj « W6SOS 8Y OLD PLANT HOT DISTURBED. SOME RESIDENT WATERFOWL BY NEW OUTFALL * ON LAGOONS.
FORT WAYNE
ISSUE:
PREDICTION:
FINDINGS:
MORE FINDINGS; PUILDIHG AT THE OLD SITE, NEAR THE RIVCR,WOULD HAVE DISTRIBUTED SOME WILD GRASSES t MAY HAVE AFFECTED
WILDLIFE FSQM NCAP8Y WETLAND. NLW SITE ^S HAD MAJOR IMPACT ON CROPLAND. LITTLE WILDLIFE AFFECTED.
PLANT CPF3ATOS NOTICED (1C C H4UGE -S I >JC E 3 PC PAT IONS BEGAN. WILDFOWL DOMINANT.
580
ALLEN
IN MAUMEE RIVER BASIN 1983
FOi?T WAYNE,CITy OF (StWERS)
SDCIO/POP
THE INITIAL POPULATION TO BE S?FV<;D BY THE PPOJHCT is m.soo.DESIGNED FOR 159,385 IN THE YEAR 2000.
THE POPULATION PREDICTION WAS ACCURATE.
GP.OWTH RATE MAS DECREASED TO ALMOST ZERO IN THE PcPIOD FROM 1980 TO 1984.
CAPACITY CF S-.WCRS NOT SUFFICIENT TO P3KCTe HIGH PAT; OF GROWTH.
FINDINGS: SLIGHT CHANGE IN GROWTH OCCURRED BECAUSE MAJOR EMPLOYE CINTERNATIONAL HARVESTER) LEFT CITY.5000 J08S
LOST.GENERAL MOTORS COMING LATE 1985 BRINGING 50CO JOBS Tt) CITY SO GROWTH SHOULD BE BACK ON SCHEDULE.
HOHPOEVILLF.
ISSUE:
PREDICTION:
FINDINGS:
ALLEN
IN MAUMEE RIVER BASIN 198C
MDNROEVILLE.SWG DISPOSAL AUTH
SOCID/POP
PROJECTED GROWTH RATE OF POPULATION IS Lit. DESIGN POPULATION IS 1,706.
NO GROWTH HAS OCCUPRED SINCE i980.POPULATION MAS REMAINED 'CONSTANT'AT ABOUT 1374 PEOPLE.
581
MOPE FINDINGS:
POPULATION IN DOCUMENT IS 10T HIGHER THAN 4CTU&L POPULATION.NO GROWTH HAS OCCURRED SINCE 1980 WHEN 1.
2X GROWTH PREDICTED. POPULATION IS EXPECTED TO 8E 2000 BY THE YEAR ZOOO ACCORDING TO TOWNS PEOPLE.
ASSUMING THE HIDGt FLIES CAN BE EXTINGUISHED FROM THE AREA.
CRIDERSVILLc
ISSUE:
PREDICTION:
FINDINGS:
MORE FINDINGS:
CRIDERSVILLE,VILLAGE OF
SOCIO/POP
AUGLIAIZE
OH MAUMEE RIVER BASIN 1977
582
POPULATION WILL INCREASE TO 58A6 BY THE Y.AR 2000. PLANT WILL INDUCE GROWTH.
CPIGERSVILLE AND THE SURROUNDING AREA EXPERIENCED A 65t RATE OF GROWTH FROM 1970-1980.
MORE GROWTH IS EXPECTED WITH APARTMENTS, HOSPITALS, AND A NURSING HOME PLANNED FOR AREA.
1500 PEOPLE MOVED INTO AREA SINCE 1974
GROWTH MAS OCCURRfD IM TH5 LAST 10-15 YEARS AND IS EXPECTED TO CONTINUE.GROWTH AT VERY HIGH RATE
-------
06AUG67
em
CRID<:RSVILLE
ISSUE:
PREDICTION!
FINDINGS:
CONCLUSION NOW WOULD BE
-------
06AUG87
CITY
MOKE FINDINGS:
CONCLUSION MOW WOULD &c PREMATURE
-------
C6AUGP7
CITY
ISSUE:
PREDICTION:
FINDINGS:
MOPE FINDINGS:
CONCLUSION NOW WOULD BE PREMATURE
PECICTnN ISCAj OF THE FIRST 5 Y-.4RS) TOO HIGH FOP -THE 5 YRS. THE AVG INCREASE HAS BEEN 0.9%/VR.
WESTON
ISSUE:
PREDICTION:
FTUOING3:
WOOD
OH MAUMEE RIVER BASIN 1979
598
W=3TOM,VILLAGE OF
SOCIO/SECOcV
AGRICULTURAL LAND WITHIN AND ARQUNO W6STON WILL BE DCV=LOPEO AS THE POPULATION t HOUSING DEMAND INC.
NO IMOUSTRUL/COMMraCIAL DEVELOPMENT HAS OCCURRED TO INCREASE THE RESIDENCY OF WESTON.
ONLY ONE NrW H3HE IS 3EI«JG BUILT TO BE ADDED TO TH: SEW2R LINE t THIS IS WITHIN THE PREV. RESIO. IONE,
THERE HAVE BE'N NO LAND USE CHANGES.
E FINDINGS: «T THIS TIME, NO POPULATION GROWTH OR NEW HOUSING DEMAND EXIST.
FUTURE DEMAND WILL bE THc ONLY WAY TO VERIFY WHETHER AGRICULTURAL LAND WILL BE THAT TAKEN OUT OF USE.
ROCHESTER
ISSUE:
PREDICTION:
FINDINGS:
ROCHcSTER.CITY OF OLMST=D
SOCIO/POP
RATE OF PROJECTED POPULATION GROWTH IS 2t PER YEAR.
POPULATION GROWTH IS SLIGHTLY LESS THAN It PER YEAR.
POPULATION ESTIHATE=60o206 FOR YEAR 1984.
MN UPPER MISSISSIPPI 1978
599
HORE FINDINGS: POPULATION GPOHTH IS SLOWER THAN PREDICTED.THE CURRENT RATE IS It PER YEAR,
-------
C6AUC87
CITY
ALMA
ISSUE:
PREDICTION:
FINDINGS:
MORE FINDINGS:
CONCLUSION NOW WOULD BE PPEMATURE
(BY RIVER BASIN)
ST RIVER BASIN
GRANT?!; COUNTY
THE PREDICTED GROWTH RATE WAS 2T PER YEAR.
THIS 1984 POPULATION ESTIMATE IS 60,206 (LATEST REVISED INFORMATION).
NEPACYIO
UI UPPER MISSISSIPPI 1983
600
ALMA MUNICIPAL WASTEWATER TRMT PLT BUFFALO
SOCIO/POP
THE POPULATION WILL REMAIN RELATIVELY STABLE THROUGH THE YEAR 200C WITH A GROWTH RATE OF ALMOST OX.
.CITY OFFICIALS CITED THE CURRENT POPULATION AS APPROXIMATELY 800.
0£CR?ASfc OF 149 FROM YEAR 1977.
IT WOULD APP.EAR THAT THE POPULATION PREDICTED IN THE DOCUMENTS MAS TOO HIGH.
IT IS DIFFICULT TO ASSESS THE ACCURACY OF THE PREDICTION DUE TO THE DISCREPANCIES BETWEEN THE SOURCES.
Ti'r C;TY OFFICIALS ATTRIBUTED THf 1977 FIGURE OF 948 TO CONSTRUCTION IN THE AREA AT THAT TIME.
BANGPR
ISSUE:
PREDICTION:
FINDINGS:
LACROSSE
WI UPPER MISSISSIPPI
1978
liANGC» .VILLAGE OF
SCCIO/POP
TM= NFW ^ACUITY WILL ALLOW FOR GROWTH IN THE AREA. POP GRWTH PROJECTED AT o.sx PER YEAR
CUPR6NT POPULATION ESTIMATED BY VILLAGE IS 110*.
601
MORE FINDINGS: ?ASEO ON POP PROJECTION, VILLAGE POP SHOULD BE ABOUT locc IN i985. ACTUAL POP is ABOUT lot ABOVE THAT,
MAINLY «?CAUS: OF NEW DEVELOPMENT ON SEWtR EXTENSION SINC? PLANT OP5NED IN 1980
BARRON
ISSUE:
PPFOICTION:
FINDINGS:
BARRON.CITY OF
BARRON
WI UPPER MISSISSIPPI 1980
SLIGHT POSITIV: AFFECT ON EMPLOYMENT, POPULATION GROWTH OF 2.H PER YEAR
^CONOPIC TRENDS SHOW NO INCREASE IN JOSS FROM 1982 TO 1983.
POPULATION IN 8ARRPN INCREASED 1.1 PERCENT SINCE 1970 AND 1.7 PERCENT SINCE 1977.
WAST'WAT'R PLOW IS C.678 MGO OR 48 FJRCrNT OF DESIGN.
MORE FINDINGS: AS pstoiCTro G»OWTH HAS NOT OCCU^ED cus TO PLANT.
«ATc OF POPUL4TI3N GROWTH IS SLOWER THAN £XP=CT=D.
602
PAPFON
ISSUE:
PREDICTION:
FINDINGS:
bAP.RCN.CITY OF
SOCIO/USERCHG
BARRON
WI UPPER MISSISSIPPI
1980
603
MORE FINDINGS:
BIRCHWOCO
ISSUE:
PREDICTION:
FINDINGS:
WASHBU9N
CIRCHWCOO.VILLAGH OF
SOCIO/SECOFV
GROWTH OF 3.9? PEF Y=AR
N£W PLANT FLOW AVG. WAS 39iOOO &PD. THIS IS LtSS THAN 1982 FLOW.
1982 FLOW = 410CC GPO; 19T2-198C FLOW = 42CCO GPO.
WI UPPER MISSISSIPPI
MOPE FINDINGS: PPOJFCT HAS NOT CAUSED INCREASED WASTEWATER FLOW.
1982
604
BRUCE
ISSUE:
PREDICTION:
RUSK
6RUC5,VILLAGE OF
SOCIO/POP
PTOJECTED YR. 20OC POPULATION WILL B£ 1,001 (DESIGN CAP4CITY=l,260)
WI UPPER MISSISSIPPI 198}
60S
-------
T6AUG87
CITV
FINDINGS:
CONCLUSION NOW WOULD BE
(?Y PIVeR BASIN)
GPANTEC
ACTUAL I960 POPULATION IS
COUNTY
ST RIVER BASIN
NEPA(VR)
MORE FINDINGS: ALTHOUGH AN ACTUAL VR 2000 POPUL. is OBVIOUSLY NOT AVAILABLE, THE PROJECTED RATE OF INCREASE HAS MUCH
HIGHER THAN IS ACTUALLY OCCURRING.
PUTTHRNUT
ISSUE:
PREDICTION:
FINDINGS:
' FINDINGS:
eUTTh»UUT.VILLAGE OF ASHLAND
SOC.IO/SMPLOY
PROJECT MAY RCSULT IN INCREASED EMPLOYMENT.
POPULAT10N UNKNOWN. ASHLAND LUM°E<> HAS LEFT TOWN.
FLOW IS HIGHER BUT INDUSTRY HAS L^T.
WI UPPER MISSISSIPPI 1981
606
flUTT :Rl!UT,V ILLAG: OF ASHLAND
ISSUE: SOC10/POP
PREDICTIJN: POPULATION GROWTH RATS WILL BE j.s p^RChNT PER YP.
FINOINGS: NO AVAILA3LE OATi ON CURRENT POPULATION.
flVv. WW FLOW WAS -J.22 "GO. HIGHER FLOWS MAY BE DUE TC I/I.
WI UPPER MISSISSIPPI
19B1
607
MORE FINDINGS; POPULATION UNKNOWN
COON VALLEY
ISSUE:
PREDICTION:
FINDINGS:
VSRNON
WI UPPER MISSISSIPPI
1981
608
COON ViLL":Y MUNICIPAL WWTP
SOCIO/LANDUS:
•iRTWTM :s EXP:CTCO TO a*: WITHIN THE VILLAGE... ADJACENT TO USH n, AND 6i » EAST OF HIAWATHA STREET
NO SIGNIFICANT DEVELOPMENT OR SECONDARY LAND USE CHANGES IN COON VALLEY SINCE NEW PLANT OPENED.
THE SbUSS EXTENSION "?AN W4S LIFTED JUST BHFORc THE PLANT OPENED.
MORE FINDINGS: NO SIGNIFICANT osowrn OR SUBSTANTIAL LAHO USF CHANGES SINCE PLANT B=GAN OPERATIONS OR SEW?:R EXTENSION
SAN wii L:FT=D.
COON VALLrY
ISSUE:
PREDICTION:
FINDINGS:
VEPNON
WI UPPER MISSISSIPPI
1981
609
COON VALL:Y MUNICIPAL WWTP
SOCIO/PQP
GROWTH IS EXPECTED TO « WITHIN THE VILLAGE...CDON VALLEY ANTICIPATES A POPULATION INCREASE OF 1.5t tR
1980 POPULATION WAS 74C . NO SIG GROWTH OR DEVELOPMENT IN COON VALLEY SINCE PLANT OPENED.
PLANT BEGAN OPERATIONS IN 1982.
MORE FINDINGS: POPULATION IS Hi £XP?CT£0 IN FNSI * FACILITIES PLAN,BUT NO SUBSTANTIAL SEWER EXTENSIONS OR DEVELOPMENT
HAVE TAKEN PLACE IN COON VALLEY SINCE THE PLANT BEGAN OPERATIONS.. WITHOUT THE NEW PLANT, THE VILLAGE
WOULD HAV= B6£N UNOiR A SEWER EXTENSION MORATORIUM IMPOSED BY THE STATE.
CORNELL
ISSUE:
PREDICTION:
FINDINGS?
CHIPPtWA
WI UPPER MISSISSIPPI 1983
610
CORNELL,CITY OF
SOCIO/POP
95? OF 2003 POPULATION TO 3£ SEWERED. I.It POPULATION INCREASE/YR.POPULATION IN 2000 TO EQUAL 1,870.
POPULATION=1659. 97X OF POPULATION S"W=RED, 558 UStRS.
MORE FINDINGS: ALL BUT
OF THE POPULATION is HOOKED UP TO THE STSTEM. POPULATION PROJECTION MSS a LITTLE S.OM
-------
06AUG87
CITT
CONCLUSION NOW WOULD B = PREMATURE
(?Y
-------
''6AUG87
CITY
MOR? FINDINGS:
CONCLUSION NOW WCULO Zi PREMATURE
(f.V ?IVCR BASIN)
COUNTY
ST RIVER BASIN
NEPA(YR)
STRUM STPUM.VILLAGE CF TR=MPEALEAU WI UPPER MISSISSIPPI 1980 617
ISSUC: SCCIO/EMPLCY
PREDICTION: THE PROJECT MIGHT RESULT in INCREASED EMPLOYMENT DUE TO NORMAL POPULATION AND ECONOMIC GROWTH
FINDINGS: EMPLOYMENT EFFECTS COULD NOT BE VERIFIED.
MORE FINDINGS: nc SIGNIFICANT CHANGE NOT?O IUT -MY HAVT OCCURRED.
HOMEVb-, THt^E IS S'OME INCONSISTENCY IM TH* T t £L SCWHE SE. GROWTH WAS SPECIFICALLY NOT PREDICTED.
MO INCRiiSr IN EMPLCYMr'iT HAS OCCU"i??D.
STPUM STFU.'I,VILLAGE OF TR = MP«:AL = AU WI UPP6R MISSISSIPPI 1980 618
ISSIJE: sccio/rop
pRtOiCTion: TH= POPULATION WILL c?ow AT » P-TI OF 1.3 PERC^MT AIINUALLV THROUGH THE YEAR 2000
F:ND:MGS: TH; CUPP = MT POPULATION :i 1066. i'i UTT IT WAS m*.
MPRT FINDINGS: POPULATION G?OUTH aeove i.?% HAS NOT B?LN A RESULT OF PLANT EXPANSION
W^STTY W = STSY 5i:WAr,j TREATMENT PLANT V~RN3N WI UPPER MISSISSIPPI 1979 619
ISSUE: sccio/fop
pp = oiCTi3Nt PR-OICTI-D ?:o; WGTBY POPULATION i-i Y? 2Ci3;i9ia POPULATION IN VP i985:onsrr,N POP EQUIV. AT 2500.
FINDINGS: i^ss POPIJL»TUN i; 19?-1.
MOR= FINDINGS: 19J5 ropuL«TioN OF 1990 is 72 P'.OPL-: MDR= THAN PREDICTED.
CASS 5iG!r(»W COUNTY WTP TUSCOLA MI SAGINAW RIV6R BASIN 1977 620
ISSUE: SOCIO/rMPLTY
PREDICTION:
FINDINGS: A LOCAL t'JPUS'"! Y 'iNCRE ASF 0 ITS HOPR FO'CE BY 5FVERAL HUNDRED
^'OPLE AS a S/.SULT OP TH:E PLANT EXPANSION.
MORE FINDINGS:
CAS3 SAGINAW COUNTY WTP TUSCOLA Hi SAGINAW PIVER BASIN 1977 621
ISSUE: SOCIO/SECO=V
PREDICTION: DCVELOPMENT WDULO NOT "-. INDUCED.
FINDINGS: TH? PLANT EXPANSION HAS RESULTED IN LIMITED PESIOENTIAL GROWTH
stio INOUST»I»L EXPANSION.
MORE FINDINGS:
^^ ^ ^ ^ .^ ^ M ^ ^ ^^™,^^^«»«»^^«"^^^^^ »^^^ •* *B^ ^••^^^^^^^^••™»^™ ^^ v « ^^^ ^^im •>«>«a«>^^«»^^^^,»«B.>^^^^^«>^^^«B^^^^^v>«i^«9 «•«*«•«•
TITT4B«,WtSS6^ >WP •* I TTd<>AWA SS Ei TWP WWTP i
-------
06AUG87
CITY
ISSUE:
PREDICTION:
FINDINGS:
CONCLUSION NOW WOULD BE PREMATURE
cer RIVER BASIN)
GRANTEE COUNTY
SOCIO/POP
OESIGN POPULATION FOR THE YEAR 2000 WILL 8= 5800.
1985 POPULATION IS l
-------
06AUG87
CITY
CONCLUSION NOW MOULD BE PREMATURE
<3Y RIVER BASIN)
GRANTED COUNTY ST RIVER BASIN NEPACVR)
BUT LITTLE EXCAVATION ON NEW LAND.ACTUAL SITE INCL EXCAVATION ON SURFACE AREA 2.7 ACRES, BUILDING UP
LOWER SIDE OP SITE t ACCESS ROAD, 6 BUILDING CULVERT.MINOR GULLYING PERSISTS AS RESULT OF CONSTRUCTION
HOWELL
ISSUE:
PREDICTION:
FINDINGS:
MOPE FINDINGS:
HOWELL,CITY OF
PHVS tNV
LIVINGSTON
MI SAGINAW RIVER BASIN 1976
SANITARY SEWrRS WERE NOT CONSTRUCTED IN MARION AND GcNOA TOWNSHIPS, NOR
GN THE IJ03THSIOE 0* LAKE THOMPSON. STREAM CHANNELIZATION OCCURRED TO
.ENHANSE W4TER FLOW IN STREAM.
628
ALMA
ISSUE:
PREDICTION:
FINDINGS:
ALMA MUNICIPAL WASTEWATER TRMT PLT BUFFALO
OTHER/P5CREATION
RECREATION WILL IMPROVE DOWNSTREAM DUE TO IMPROVED WAT=R QUALITY.
TH^RE HAS "if.1* NO KNOWN IMPACT CN RcCREATION AS A RESULT OF THIS PROJECT.
WI UPPER MISSISSIPPI 1980
629
MOR = FINDINGS: RECREATION WAS NOT
CUE TO THE PROJECT, ;VEN THOUGH WATER QUALITY DID IMPROVE.
COOM VALLEY
ISSUt:
PR30:CTION
FINDINGS:
MOR€
r»OODHC'£
ISSUE:
PREDICTION:
FINDINGS:
VERNON
WI UPPER MISSISSIPPI
1981
630
COCN VuLL^Y MUNICIPAL WWTP
CULTURAL .^SDU'CE
110 ARCHAEOLOGICAL 0iSOURCiS TllftT SHOULD «; INCLUDED ON NAT.REG.OF HIST.PLACES FOR COON VALLEY PROJ.ARS
STctiu CHiPSt APC.OWHEAOS<:T OBJECTS)WER= FOUND ASOUT sc FT DOWNHILL FROM LAGOONS.
ST4TC H1ST3BIC SC1CIETY MADE SITE HISTORIC PLACE IN 118 2. MAT ERIAL US = D TO RAISE LOWER SIDE OF
LAiiC3MS Mftt HAVt COVERED SOM= OF THE OQCUMtNTED SITE
T*: 1S81 FNJI ASSU^rO OLD PLANT SITi WOULO BE USED. 27 STONE OBJECTS WERE FOUND IN STUDY OF ACTUAL
SIT£,AtlO IIT: WAS L!ST?0 BY STATE IN RcG.OF H1ST.PLACES.SOME ADDITIONAL OBJECTS MAY HAVE BEEN FURTHER
COVERED DURING CONSTRUCTION, BUT NO NOTABLE OBJECTS U:RE DUG UP IN CONSTRUCTION.
GCC-OHUi.CITY OF
SOLID HAST=
GOCOHUc
MN UPP6R MISSISSIPPI
SLUDGE IS LANi) APPLIED ON SURROUNDIMG AGRICULTURAL FIELDS.
19B2
631
MORE FINDINGS:
COON VALLEY
ISSUE:
PREDICTION:
FINDINGS:
VERNON
WI UPPER MISSISSIPPI
1981
632
COON VJLL?Y MUNICIPAL WWTP
SOLID WASTE
AG LAND USE FOR SLUDGE DISPOSAL WILL BE AFFECTED BY SPREADING TECHNIQUES...MAY AFFECT GROUNDWATER.
NiW LAGOONS HAVE HOT YET BEEN CLEANED I SO HAVE PRODUCED NO SOLID WASTE OR SLUDGE TO DATE.
VILLAGE HAS AN APPROVED SLUDGE SPREADING SIT= WHEN NECESSARY FOR FUTURE USE.
MORE FINDINGS: AERATED LAGJONS PRODUCE NO SLUDGE. THEY MAY MEED TO BE DREDGED IN THE FUTURE, BUT VILLAGE ALREADY HAS
APPROVED SIT£S FOR FUTURE MATERIAL
FOUNTAIN CITY
ISSUE:
PREDICTION?
FOUNTAIN CITY,CITY OF
SOLID WASTF.
SUFFALO
WI UPPER MISSISSIPPI 1979
633
-------
C6AUG87
CONCLUSION NOW WOULD 8E PREMATURE
(BY RIVcR BASIN)
CITY GRANTEE COUNTY ST RIVER BASIN NEPACVR)
FINDINGS: SLUDGE DIGESTER AGITATED i HR/OAV.LANO APPLIED IN SPRING TO FARM GROWING CORN t SOYBEAN FOR FEED.
30 T/YR SLUDGE GENERATION RATE.
MORE FINDINGS: NO PREDICTION MADE.
HOLLY OAKLAND COUNTY DPW OAKLAND MI SAGINAW RIVER BASIN 1977 634
ISSUE: SOLID WASTE
PREDICTION: NO ADVERSE IMPACTS our TO SLUDGE AND SPOIL DISPOSAL. SPOIL USED AS LANDSCAPE.
FINDINGS: KLUDGE STORID ON-SITE IN A 320tOOO GAL TANK. SPOIL USED AS BERM FOR LANDSCAPE.
MORE FINDINGS:
HARROD H&RROD,VILLAGE OF ALLEN OH MAUMEE RIVER BASIN 1977 635
ISSUE: ENERGY
PREDICTION:
FINDINGS: START-UP PROBLEMS. PLANT MIT BY LIGHTNING. ELECTRIC COST OVER EST. BUDGET.
COSTS ARE »30J-»600/MONTH, HAV6 BEEN OVfcR *600.
MORE FINDINGS: ELECTRICAL CTSTS OV-R BUDGET.
KALIDA KALIDA,VILLAGE OF PUTNAM OH MAUMEE RIVER BASIN 1976 636
ISSUE: ENERGY
PREDICTION: i«9,soo KHH ANNUAL ELECTRICAL use.
FINDINGS: ELFCTRIC USF. FOR ONE Y?AR IS ABOUT 17,200.
MORE FINDINGS: DATA COULD LOT BE OBTAINED OP "ESTIMATED.
UNIOPCLIS UNIOPOLIS.VILLAGE CF AUGLAIZE OH MAUMEE RIVER BASIN 1977 637
ISSUE: ENERGY
PREDICTION:
FINDINGS: ELECTRICAL COSTS FOR PLANT RANGE FROM $S/OAY TO ti3/DAV IN i985.(ORiG.auoG.UNAVAILABLE).
\
MORE FINDINGS: COSTS ARF ie TO »13 PER DAY FOR ELECTRICITY IN 1985. NO IMPACTS WERE PREDICTED.
BARRON BARRON,CITY OF BARRON WI UPPER MISSISSIPPI I960 638
ISSUE: ENERGY
PREDICTION:
FINDINGS: POWER COST NOT SHOWN, BUT RATE IS 3.7 CENTS/KU-HR.
MORE FINDINGS: POWER COST MAY ee LESS THAN PREDICTED BASED ON PER KW-HR COST.
-------
C6AUG8T
CITY
CONCLUSION NOW MOULD Be PREMATURE
(f>Y 9IVER BASIN)
GPANTEi
COUNTY
WASH9URN
ST RIVER BASIN NEPA(VR)
WI UPPER MISSISSIPPI 1982 639
BIPCHWOOO BIRCHWGOD.VILLAGE OF
ISSUE; =nfRGY
PREDICTION: POWER HILL BE USED.
FINDINGS: NEW PLtNT. CANNOT DETERMINE POWER USE FROM DATA
MORE FINDINGS: PLANT WENT ON-LINE IN LATE 1984. NO POWER COST DATA AVAILABLE.
POWER USE A3 EXPECTED ACCORDING TO OPERATOR.
RUSK
WI UPPER MISSISSIPPI 1983
BRUCE RPUCE,VILLAGE OF
ISSUE: ENERGY
PREDICTION: MAPGIHAL INCRLASB IN RESOURCES USED CURING CONSTRUCTION AND ENERGY USE LONG-TERM FOR EQUIPMENT
FINDINGS: 199* TOTAL POWrK CTST WAS »6,659.C6tTOTAL POWER USAGE NOT AVAILABLE IN SUMMARY FORM.
640
HOPE FINDINGS: NO PSE-CONST WAS LDHL« IN EN;OGY USE THAN THE ORIGINALLY PROPOSED ACTIVATED SLUDGE PLANT. BOTH HIGHER THAN OLD
PUNT.
PHILLIPS PHILLIPS,CITY OF PRICE WI UPPER MISSISSIPPI 1983
ISSUE: ENERGY
PREDICTION:
FINDINGS: USER CHARGES FOR QtM WERE ACCURATELY PREDICTED BY FACILITIES PLAN AND NEPA DOCUMENT.
643
MORE FINDINGS:
LAPEER
tAPESR LAPSER.CITY Qf
ISSUE: ENERGY
PREDICTIONS THE PLANT WILL HAVE TWO POWER LINcS FOP 9600 KWH/OAy FOR FLOWS OF 4 MGO.
FINDINGS: TH: PLAUT DOES HAVE TWO POWER LINES FO 3000 KWH/DAY FOR FLOWS OF 1.3 MOD.
MI SAGINAW RIVER BASIN 1976 644
-------
06AUG87
CITY
MORC FINDINGS:
CONCLUSION NOW WOULD BE PREMATURE
(P,Y RIVER BASIN)
GRANT EC
COUNTY
ST RIVER BASIN
NEPAOR)
SAGINAW
HI SAGINAU RIVER BASIN 1979
TITTABAWASSEP TWP TITTAPAWASSEE TWP WMTP
ISSUE: PNCRGY
PREDICTION: ENERGY REQUIREMENTS WOULD BE LESS THAN THAT OF A COMPARABLE BIOLOGICAL UWTP.
FINDINGS: COULD NOT BC EVALUATED.
645
MORE FIND INGSs
COON VALLEY
ISSUE:
PREDICTION:
FINDINGS:
VcRNON
COON VALLEY MUNICIPAL MWTP
AIR QUALITY
NO INCINERATION...ODORS MINIMIZED...EXHAUST FUMES DURING CONSTRUCTION
STATE ENGINEER AND VILLAGE OPEPATOR SAY ODOR NEVER AN ISSUE.
WI UPPER MISSISSIPPI
1981
646
MOP.E FINDINGS: WINTER CONDITIONS. BUT NO EVIDENCE OF ODOR. LAGOONS ARE AWAY FROM HOUSES, so LESS CHANCE FOR COMPLAINT
THAU WITH THE ORIGINALLY PROPOSED RBC SYSTEM.
GOOOHUE
ISSUE:
PREDICTION:
FINDINGS:
GOODHUE
MN UPPER MISSISSIPPI
GOOOHUE,CITY OF
OTHER/PCCREATION
IMPROVED WATER QUALITY WOULD ENHANSE RECREATIONAL OPPORTUNITIES DOWNSTREAM.
NOT DETERMINED IF DOWNSTREAM RECREATION IMPROVED.
1982
647
MORE FINDINGS:
ROCHESTER
ISSUE:
PREDICTION:
FINDINGS:
MORE FINDINGS:
OLMSTED
MN UPPER MISSISSIPPI
1978
ROCHESTER,CITY OF
OTHER/RECREATION
DOWNSTREAM RECREATIONAL CAPABILITIES WILL BE ENHANCED DUE TO REDUCED POLLUTION IN THE STREAM.
DATA WERE NUT AVAILABLE FOP WATER QUALITY.THEY ARE UNDER REVIEW BY A CONSULTANT.
IN TER'«S OF RcCRPATlONflL ENHANCEMENT,HO STUDIES HAVE BEEN CONDUCTED.
648
OAKLAND COUNTY OPW
OTHER/RtCREATIOH
OAKLAND
MI SAGINAU RIVER BASIN 1977
HOLLY
ISSUE:
PREDICTION:
FINDINGS: RtCRFATiONAL VILU;: OF RIVERS AND LAKES IN PLANNING AREA INCREASED
BY IMPROVEMENTS IN SURFACE WATER QUALITY. NO IMPACT INFORMATION IS AVAILABLE.
649
HORE FINDINGS: PLANT is APPROXIMATELY 3 MILES FROM NEAREST IMPOUNDMENT.
------- |