January 1988
Complete Data Base  for:
Evaluation of  Predicted and
Actual Impacts of Construction
Grants Projects  in Three River
Basins of Region V
                                    Saginaw River Basin
                                     x
                                  ^  Maumee River Basin
  Lower Portion of Upper Mississippi River Basin

-------
               COMPLETE DATA BASE FOR:
       EVALUATION OF PREDICTED AND ACTUAL IMPACTS
OF CONSTRUCTION GRANTS PROJECTS IN THREE RIVER BASINS  OF
                        REGION V
                      JANUARY 1988
                      Prepared by:

     United States Environmental  Protection Agency
                        Region V
            Environmental  Planning Section
               230 South Dearborn Street
               Chicago, Illinois   60604

                         and

     Science Applications International Corporation
                  8400 Westpark Drive
                McLean, Virginia   22102

-------
 C6AUGP7
 CITY
                   as  PfEOICT-D TO ?FTTcR THAN PREDICTED
                         (UY  
-------
  C64UGe7             AS  PFEOfCrED  TO 3ETICR  THAN PREDICTS
 CITY                 GPANTEt                            COUNTY                ST  RIVER BASIN         NEPA(YH)
                 DOWNSTREAM.  1184=11 £, 3.2 UPSTREAM £  10 C 6.9  DOWNSTREAM
  MORE FINDINGS: WATER QUALITY WAS IMPROVED ou: TO ELIMINATION OF  THE  RAW  SEWAGE  DISCHARGE



 CRICERSVILLE         C P ID£R3V ILLE, VILLAGE OF            AUGLIAIZE             OH  HAUMEE RIVER BASIN  1977     7
  ISSUE:          WATER QUAL/SURFAC :
  PREDICTION:    INCREASE KATE* QUALITY IN RECEIVING STREAM AND  SLITNATE  WEATHER OVERFLOWS.
  FINDINGS:       STREAM  DUALITY HAS IMPROVED DOWNSTRc AM.BOO IS 4.6  MG/Li  SS  IS 9.0 HG/L,  0.0. IS 6.2 MG/L.
                 EFRLU:MT QUALITY IN MAY H83 FOR N;W PLANT - eoo=n MG/L,  ss=io  MG/L,O.O.= 5.4 MG/L

  MOUr FINDING?: WiT^R JU&LITT HAS NCTIC-.A8LV IMPROV-0  !M STPE AM. AFFLUENT  QUALITY IS BFTTER



 HARFOD               H«kR']P, VILLAGE OF                  ALLEN                 OH  1AUMEE RIVER BASIN  1977     8
                    i R QUAL/SUSFACE
                       rO WATER QUALITY
  FINDINGS:       tM'POV'D WATiS QUALITY IN STREAM NEAR  DlSCHAP&c  Af4D DOWNSTREAM


  MOR: FTND1NG35 IMPROVED WST-'R OUALITY.
                 DOMMSTRfAM COJ IS 4.5 MG/L, TSS IS 2?. 5 MG/L AND  0.0.  IS  3.8  MG/L


 KALIPA         '      KALT?*,VlLLAt-E "IF           ..       PUTNAM                OH  MAUMEE RIVER BASIN  1976     9
  ISSUI:          '.4AT5P QUAL/G»3IJfi3
  FINDINGS?


  MORC  FINDINGS:  ALTHOUGH in P-^OIC*IIN MAS MAOT, CITY SOURCES  STATED  THAT  NO  DRINKING WELLS HAD EVER BEEN TAINTED.



 RAL!PA               KiL IDA, VILLAGE TF                  PUTNAM                OH  MAUMEE  RIVER BASIN  1976     1C
  ISSUE:          WAT'R .JUAL/SURPAC:
.  PREDICTION:     fLimi CLrdRLP, OPOrS Wr;?E ?LIMIMAT?D.
     T  FIHCINGS:  ELIMIIMTION OF SEPTIC TANK us: HAS RESULTED  IN  IMPROVED  WATER  QUALITY TO PLUM CREEK AND OTTOWA RIVER.


 MONTPELIFR            MONTPfLIE? SWG TRT PLT             WILLIAMS             OH  MAUMEE  RIVER BASIN  1983     11
  ISSUE:          WATE
-------
 06AUG97
CITY
  ISSUE:
  PREDICTION!
  FINTl'IGS:
                  AS PREDICTED TO BETTER THAN PREDICTED
                            ;VLP BASIN)
                    GPANTEi:

               WATER QU4L/GRCUUC1
                                                         COUNTY
                                                                              ST RIVER BASIN
                                                                                      NEPA(YR)
    E FINDINGS: NO
                              IMPACTS WERE PREDICTED
                                                          IDENTIFIED.
NAPOLEON
 ISSUE:
 PREDICTION:
 FINDINGS:
                    NAPOLFCN

               WATER 3U1L/SURFAC;
                                                         HENRY
                                                                              OH MAUMEE RIVER  BASIN   1977
                                                                                                              13
               EFFLUi.'lT CONCENTRATIONS  OF  POP?,  i > ,  RTSTfUAL  CHLORINE ANO PHOSPHORUS HAVE BEEN REDUCED.
               FECAL CJLIFC^M CONCENTRATIONS  HAVE  ALSO  UEEN  REDUCED SINCE PROJECT COMPLETION.
      PI'.'DtNf.S : N2 pPfPICTICNS  REGAPDING WATER QUALITY WERE HADE.PLANT EFFLUENT QUALITY HAS  INCREASED  SINCE PROJECT
                CCMPL:TICN.TH.;  TREATMENT PLANT ALSO HAS ADEQUATE CAPACITY TO HANDLE PEAK  FLOWS.
RIOGEVILLE CORMEPS    MC-IRY  COU'ITYCPIPGEVILLI CORNERS)   HENRY          .      OH MAUMEE  RIVER  BASIN   1976      i
 ISSUE:         WATER  JUAL/G^'JNO
 PREDICTION:    TH^  P:^PPOSKD  ACTION DOES NOT LTSTUR-* -iPDum WATER QUALITY EXCEPT SLIGHTLY  DURING  CONSTRUCTION
 FINDINGS:      THERE  AS-  APPA'^MTLY MO PRODLPMS WITH GROUND WATER QUALITY.
 MORF FIMDINGSS  GF.3UNP  H*T=R  IS  MOT CUPR^flTLY NCT NEGATIVELY AFFECTED BY THE COMPLETED PROJECT  t  ITS  ASSOC.  FLOWS.
                 AL>Ot Tj-:-  PLANT  aP'RATOR S-'CALLLO NO P^OSL-.MS A5SCCIAT:D WITH CONSTRUCTION.
FIDGEVILLE
 ISSUE:
 PREDICTION:
 FINDINGS:
                                                                              OH MAUMEE RIVER  BASIN   1976
                                                                                                              15
:RS    hrtlPY CPU^TY(3IPGEVILLE CORNERS)   HENRY
 WATER OU4L/SUPFAC-
 TH-  PfQPO::D ACTION SHOULD «EDl>CF POLLUTION t TURfilOITY LEVELS  W/IN  THE  RECEIVING WATERWAY
 THE  CHANG? F?OM SEPTIC TANK SY?T=MS TO $:WER LIN'S HAS RESULTED IN  DECREASED DISCHARGED POLLUTANTS.
 THE  TRTATMEIiT. BY THE PLANT PROVIDES AN EFFLUENT T'J THE RECEIVING  WATERWAY  FAR BELOW THE PERMIT LIMITS
         4vc. t :c t ss AP- SPOUT o.T-r.s M^/L AMD  ?.5-<».5 «r./L,  RESPECT IV^.LY
M0?c FINDINGS:
                      . r DIC TI?;i Uii  ACCUF4TI. POLLUTION A MO TURPIC'ITY HAVE PEEN REDUCED
TOLFDC
  ISSUR:
  PRfDICTION:
  FINDINGS:
                                   DGE                   WOOD                 OH MAUMEE RIVER  BASIN   198)
                 WA'ER  OUtL/SU^PAC"
                 PPOJECT  WILL  ELIMINATE 8YP1SSES DF RAW SEWAGE AND IMPROVE THE QUALITY OF CEDAR  CREEK
                 WATEP  QUiLITY  HAS IMPROVED.NO HA^D DATA AVAILABLE TU SUBSTANTIATE  THIStHOWEVER.
                                                                                                              16
 MOPE  FINDINGS:  csvs ARE  SAID TO e; UNDER CONTROL DUE TO CONSTRUCTION OF NEW SEWER LINES
TOLF.DC
 ISSUE:
 PREDICTION:
 FINDINGS:
                    THLECT.CITY  OF  (TFN  MILE  CREEK)     LIJCA1                OH MAUMEE RIVER BASIN  1977      17
               WATiR  JUAL/jll?FAC£
               'EDUCTION  IN TOXKITY  OF  THE RIVER  CAUSED BY  CSO'S/RE DUCT ION IN BOD DIRECTLY RELATED TO OVERFLOWS
               R^COMME.-JOED S:W:R  RELIEF  AND INTERCEPTOR  UPGRADES WERE COMPLETED AS PLANNED
               CCMP.'N-D SEUr? OVERFLOWS  H4VE  BEEN  MITIGATED  IN THE  COMSINFD SEWER AREAS.
 MORE FINDINGS: WATE? QUALITY  IN  TFN  MIL:  CREEK  HAS IMPROVED DUE TO ABATEMENT OF COMBINED  SEMER.  OVERFLOWS

-------
C6AUG67



CITY
                    «S  PfEDICTiO  TO  BETTER  THAN  PREDICTED
                         (3T  R.:V--;R  9ASIN)


                     GCAMTci;                            COUNTY                ST RIVER BASIN         NEPA(YR)
                 RELIEF  SEWERS  HAVE  BEEN  INSTALLED  TO  ALLEVIATE  HI&H  FLOW CONDITIONS IN THE EXISTING SEWERS
TOLEDO
 ISSUE:
                                                        LUCAS
                                                                              OH NAUHEE RIVER BASIN  1989
                                                                                              18
 FINDINGS:
 MORE FINDINGS:
     TOLEDO,CITY OF (8AYVIEW)
WATER QU4L/3URFACE
WATER QUALITY WILL IMPROVE AS A RESULT OF THE PROPOSED  PROJECT
TACTTRru LEVELS HAVE BEEN REDUCED DUE TO ELI«1INATION OF CSO'S
PHOSPHOROUS LHVELS IN PLANT DISCHARGE HAVE BEEN OcOUCED-NOT  SUBSTANTIALLYiHOWEVER.
PLANT DISCHARGE HAS GENERALLY SEEN AN INCREASE IN QUALITY  DUE TO  PLANT  UPGRADES.
PL A I* T DISCHARGES HAVE INCREASED IN QUALITY. SOME PERMIT LIMITATIONS  ARE STILL  BEING EXCEEDED.
"HUT UPGRADES ARE NOT COMPLETE AND WILL FURTHER INCREASE  PLANT OISCHRGE  QUALITY.
OVERALL SURFACE WATER QUALITY WILL NOT 9E IMPROVED  GREATLY DUE TO EXISTING  WATER  QUALITY  PROBLEMS.
UIIIOPOLIS
 ISSUE:
 PREDICTION:
 FINDINGS:
                                                         AUGLAI7E
                                                              OH MAU1EE  RIVER BASIN  1977
                                                                                              19
     UNIOPQLIS,VILLAGE OF
      QUAL/'.-RQUND
POSSIBLE BENEFICIAL EFFECT ON GROUNDUATER  QUALITY.   ELIMINATE  INDIVIDUAL  WASTE  TREATMENT  SYSTEMS.
MO KNOWN
 HORF FINDINGS
                   ZHP-CTS JV:O;NT
UNIOPCLIS
 ISSUE:
 PPEDICTION:
                     LirilOPOLIS .VILLAGE  OF                AU'.^LAU:             OH MAUMEE RIVER BASIN  1977     20
                WATbR QUSL'SUF.pACi:
                    
-------
                    AS  PKEDUTJIQ TC CPTTLR THAh PB£DICT=0
                         ?cDUCING  DcTENTION TIM; IF ALLOWED 8» STATE.
 ISSUE:
 PREDICTION:
 FINDINGS:
                                     WA$T?WIT-R TI?MT PLT ?UFFALO
      OU»L/GFOUNP
                                                                               WI UPPER MISSISSIPPI
                                                                                      1983
 MOFE FINPiriCS: »IO  IMPACT  TC  GOJUMOWATER HAS 86FN
AUGUSTA
 ISSUE:
 PREDICTION:
 FINDINGS:
     SUGUSTi.CITY OF
WATER QUAL/G°OUItD
                                                          EAU  CLAIRE
WI UPPER MISSISSIPPI
                                                                                                       197T
THEFE HAS etcii no  GPOUNP  HATCR CONTAMINATION AS a RESULT-OF  THE  PLANT.
TH;PE i: A CfLLLCTIJN  SYST'M UND=K THE SLUOGE ORYIflG 6rDS.
 MOPE FINDINGS:  PFOXIMITY  OF  PLANT TO THE STREAM MAKES  GFOUNOWATER  CONTAMINATION UNLIKELY.
                 THFRE  HAS  ?trf, us CONTAMINATION OfTECT-D.tn  PREDICTION WAS MADE.
                                                                                               27
AUGUSTA
 ISSUE:
 PREDICTION:
                                         SAU CLAIRE
                                                                               WI UPPER MISSISSIPPI
                        1977
                                                                                                            28
     AUGU3TA.CITY OF
WATER QUAL/SUSPAC£
WAT£P 3U4LITY IF BRIOGE  C=?E-:K  WILL BE TMPROVED AS ft RESULT OF  REOUCHO  800  C SS LOADINGS C CHLORINE.
ACTUAL CnNOITIONS MUCH  IMPi-CVtD. AV = R AGc AFFLUENT, 500 = 11 MG/L,  SS=12  MG/L.
PF°MIT LIMITS- WINTER 3i-/3n , SU«M t R 20/2C.
 MORE FINDINGS:  TH;  PCES5NT  PHUT IS OPERATING W::LL WITHIN  ITS  P = KMIT LIMITS AND THE WATER QUALITY  HAS  IMPROVED.

-------
JS
                       '  =OICTHD
                         (,'Y  RIVC
                                 "C BETTER THAU P~EOICTFD
                                 R BASIN)
 CITY
BANCO R
 ISSUE:
 PREDICTION:
                                                         COUNTY
                                                                               ST  RIVER BASIN
                                                                                                      NEPA(YR)
                                                         LACROSSE
                                                                              WI UPPER  MISSISSIPPI    1978
                                                                                            29
     RANGU? .VILLAGE OF
WATER QU4L/SURFACE
WATLR QUALITY TF DUTCH CRErK  MILL  B!;  IMPROVED WITH T^ COMPLETION OP THE PROJECT
ACTUAL PLANT MEETING PFSMIT LIMITS  30  300,  30SS, 6-9 PH, 0.5 RES CHLo «100  FECAL.
       T AVIRiGS IS ABOUT  15  MG/L  BOD  AND  15  MG/L SUSPENDED SOLIDS. PLANT BEGAN OPERATION LATE 1980.
 MOR? FINDINGS: NEW PLANT  EASILY  MEETS PERMIT LIMITS + HAS EXCESS CAPACITY.
                    E  PUNP  HOLDS  ALL  PEAK  FLOW.
PAPRON
 ISSUCS
 PREDICTION:
                      PARRON.CITY  OF                     9ARRQN
                WATFR  QU«L/SU=tFACc
                SL^FACt;  MAT;?  'jHOULD IMPROVE; NC OIR.CT DISCHARGES.
                SU?FAC"  WiT.?  JUALITY APPEARS TQ HAVE IMPROVED.
                                                           MI UPPER MISSISSIPPI
                                                                                      1980
                                                                                                               30
     CIRCHWJ30,VILLAGE OF
                                                         WA SH9URM
                                                                              HI UPPER  MISSISSIPPI
                                                                                   1982
                                                                                               31
fUSCHWQCD
 ISSUE:
 PPEOICTION:    .?Y THI. TIM<:-  vnsT~w4T?R  CACHES GW,  OBJECTIONABLE: COMPONENTS WILL  BE  REMOVED.  NO  AFFECT ON TOWN MATER.
               • TWO MONITORING  WFLLS  ARQUNO SITE-GROUNDHATC-R QUALITY IS GOOD.
               ' N5W PLl.'JT  EFFLUENT  HAO  AVG 300 A*»D  TSS OF 47 ANO 25 MG/L, RESPECTIVELY.
  PRE FINDINGS: OROUNlUtT-jR  HA?  HOT  PE=H IMPACT:] BY DISCHARG:.
                •liw  PLANT'S  4V,  OLMQVAL is SAMT AS OLD PLANT, «UT WITHOUT  LARGE  UPSETS.
BUTTERNUT
 issuer
 PREDICTION:
 FIliOINGS:
 MORF. FINDINGS!
     vUTT;PIIUT,VILHr,E  OB                ASHLAND
WATER OUAL/SURrAC-:
WATtR QUALITY OF 9UTTERHUT  CREEK  AND LAKE WILL IMPFQVE.
EXISTING PLAMT DISCHAar.ES TO  GROUND  AT  REMOTE SITi.
                                                                              MI UPP5R  MISSISSIPPI
                                                                                   1981
                                                                                               32
PLANT
      Mf:
                                 ITS  »
                                          AN? TSS LIMITS. PLANT EFFLUENT  ADOS  IMPQRT4NT AMTS OF INORGANICS TO GUNOMATER
                NOT ALL S:<>T:C T«NKJ  HOOKID  UP.  NO  CONTROL ON AGRICULTURAL RUNOFF.
                SURFACE MAT1R 1U4LITY HAS  IHPROV'O  CUE  TO REMOVAL OF DIRECT DISCHARGE.
                6UT PROBLEMS OF SEPTIC TANKS  AN3 AGRICULTURAL RUNOFF HERE NOT AFFECTED  BY  PROJECT.
CORNELL
 ISSUi:
 PREDICTION:
 FINDINGS:
                     CORNELL,CITY OF
                MATER OU4L/GROUNO
                                     CHIPPEMA
                                                              MI UPPER MISSISSIPPI
                                                                                      1983
                                                                                                               33
                TH-RE HAVti t>EEN NO P?PORTEO  GROUNOWATER PROBL3MS ASSOCIATED WITH PLANT  OPERATIONS  OR SLUDGE DISP.
                SLUDGF IS AM4LYZFD YEARLY  AND  IS  APPLIFO IN ACCO^OSNCE WITH A STATE  PROGRAM  SETTING LOADING RATES,ETC.
 HOP? FINDINGS: GROUNIIMATSR  WAS HOT  ADDRESSED IN THE PLANNING DOCUMENTS  BUT  ND  PROBLEMS HAVE BEEN ENCOUNTERED
CORNELL
 ISSUE:
 PREDICTION:
 FINDINGS:
                     CORNcLLoCITY OF                     CHIPPEMA             MI UPPER  MISSISSIPPI    1983     3*
                MATiiR 3UAL/SU3FACE
                CUNSTRUCTION WILL HAVE  B-NEFICIAL  IMPACT ON CLARK CRc = K.01SCH4RGE  INTO  CMIPPEWfl  R  MON°T AOVERSLV IMPAC
                scuM.finoRj.tTJvnus  POLLUTION  IN CLARK CREEK ELIMINATED.PRESENT DISCHARGE  TO CHIPPEMA RIVER GOOD.
                >Pf«ATIIlG MrLt- MlTHtM  PERMIT  LIMITS 3F 30/?0.19B^ AVt 800= 20, S S= 16. l«0  AOVeRSE IMPACTS ON CHIPPEMA RIV.

-------
06AUC87


CITY
                TO S^THR  THAN  PREDICTED
        
-------
r6AUr,87


CITY

 PREDICTION:
AS Pr-EDtCT;0 TO  BrTTER  THAN  PREDICTED
     (PY »!VcR 6ASIN)

  i'. p ANTE:
                                                          COUNTY
                                                               ST RIVED  8ASIN
                        NEPft(YR)
                 WiLL  WfiTFR H&S NOT CHANGED.THgRE  ARE  N1 KNOWN POLLUTED WELLS.
 MPF.: FINDINGS:  no  IMPACT TU GPOUND WATER HAS  BEEN  OBSERVED.
PLUM CITY
 issue:
                                                               WI UPP:R  MISSISSIPPI
                        1979
                     PLUM  C:TY,VILLAGE OF                PIERCE
                UATLR  
-------
06AUi;87
CITY
              AS  PREDICTED TO BETTER THAN PREDICTED
                   C3T  °IVER BASIN)
               GCANTEC.                             COUNTY
                                                               ST  RIVER BASIN
                                                                                      NEPA(YR)
ST. L1UIS
  ISSUE:
 FINDINGS:
                                                   GRATIOT
     ST. LOUIS, CITY  OF
WATER JUAL/SURFAC:
"UHANS-D AMMONIA ANO  PHJSPHO°US  RE10VAL.
TiCRE HAS <•••:-•* SIGNIFICANT  IMPROVEMENT IN THE AFFLUENT OISCMARGEO  TO THE
PIN:
                                                                                   SAGINAW  RIVER  BASIN 1976
    = FINDINGS:
CASS
 ISSUE:
 PREDICTION:
 f i f n: .'i c. s:
    " r HID INGS:
             COUNTY  WTP
                                                    TUSCOLA
                                                                         HI SAGINAW RIVER  BASIN  1977
               R  'JUAL  STANDARDS IN CASS RIVER UOULO  3E  MET  AS  A  R = SULT OF THIS PROJECT.
            MUCH  •''ETT.?  TRFATMENT EFFICIF'iCY H4S RESULTED  IN  TH:
            H:EVKM-|  103MG/L.
     GLAOWMi.CITY
                                                   GL40WIN
                                                                         MI SAGINAW RIVER BASIN  1976
                                                                                               49
           aOO  A dC  S;  liILL Br LESS THAN 30 MG/L.   PHQ3PHURUS  WILL ALSO SE REDUCED.
           30D  AKO  Si  i- .^MQVAL ARE EXCEEDING 9T?  REMOVAL.  TYPICALLY CONCENTRATIONS ARE LESS THAN  20  MG PER LITER
           .  MA"CH  199A:  rFFLUdNTCMQNTHLY AVE.):  300  19MG/L,  S5  21.  NOV 198«»: EFFLUENTCHONTHLY  AVE.): BOO 17MG/
           L.
FINOINCS:  "-'OD  AliC  SS  P'MOVALS ARE MEETING DfSIGN PREDICTIONS  PHOSPHORUS REMOVAL  IS AT 60 TO  70X.  THE PLANT IS
           rHPLOVIilG THC  USF OF FERRIC CHLQPIDe  TO  REDUCE PHOSPHORUS CONCENTRATIONS. THERE IS A  REDUCTION OF 20
HOLLY
 ISSUE:
 PREDICTION:
 FINDINGS:
                                                    OAKLAND
                                                               MI  SAGINAW  RIVER BASIN 1977
     OAKLAND COUNTY  OPW
WATcR OUAL/GROUdO
WATtR QU4L cNHANSEO:  ELIMINATION OF IMPROPERLY TREATED SEPTIC  TANK  EFFLUENT.
WATCR '3UAL IMPPJViD.   HOUSES  ACJAC'NT T0 NTU' LINES MAVE HOOKF.O-UP,
THEREeY ELIPINITIOG  ON-SITF
50
 MOR: FinoiNGs:  WATEP QUALITY IMPSOVED AS  PREDICTEO  AND POTENTIAL HEALTH RISKS REDUCED.  PERCHED WATER TABLE AT LESS
                 THAN 10 FT. 15 TH; WATER  SOURCE  FOR  INDIVIDUAL RESIDENCES IN HOLLY TOWNSHIP.
HOLLY
 issur:
 PREDICTION:
               G4KLAMO  COUNTY OPW
          WATER gUAL/SUPFAC"
          HATMFUL ALO'AL  5SOWTH IN THr
                                         OAKLAND              MI  SAGINAU  RIVER  BASIN 1977

                                   WILL  BE  oEDUCHOt AS WILL 8=  TRU3IOITY.
                                                                                                51

-------
f6AUGS7
   AS P(FDICTED TO BETTER THAN PREDICTED
        OY RIVCR BASIN)
CITY                 GFANTPE                             COUNTY                ST  RIVER  BASIN
 FINDINGS:      Cf'S:.RV4TIONS  A?E  A  GREAT  REDUCTION IN ALGAL GROWTH AND TURBIDITY  IN  TH£
                      TO 4 TO  5 MIL£S  DOWNSTREAM CF PLANT OUTFALL.
                                                                                      NEPA(YR)
 MORE FINDINGS!
HOWELL
 ISSUE:
 FItlOIHtSJ
                                         LIVINGSTON
                                                                               HI  SAGINAW RIVER BASIN 19T6
                     HOWELL,CITY OF
                WATER QUAL/GRGUND
                cAUinr, S:PTIC TANKS WILL  *£  REMOV'D,  rLIMINATING POTENTIAL GROUND WATER  IMPACTS
                SEWIF LINF.S NOT BUILT.  MO DOCUMENTED  CASES OF WELL CONTAMINATION.
                                 52
 HCkE FINDINGS:
LAPEfR
 ISSUE:
 PPEPICTION:
 FIUPINGS: •
                                                         LAPEER

                                           SOUT« BRAtlCH Op THE FLINT
     L6PE=«iCITY OF
WATER OUAL/jUR^AC;
AeAT-. POLLUTION  Til TO
W*TtR QUALITY  EIIHANCcD
               AN"  EXPANSION  PROVIDE  TERTIAPY TPEATM^NT.
MI SAGINAW RIVER BASIN 1976
                                                                                                               53
  MORF  FINDINGS:  SOUTH BRANCH JP FLINT RIV;P is a FULL CONTACT BOOY OF  W»T?R.  UPGRADE  OF  PLANT HAS ENHANCED WATER QUA
                 L:TY.  in  INFORMATION WITH PEGAPD TO BIOLOGICAL OF aguATic  LIFE.  EFFLUENT LOADINGS TO RECEIVING STREA
                                                         SAGINAW

                                                           R QUALITY.
TITTABAWASSF? THP    T I TT A? AW A S3 f. '.  TWP  WHTP
 ISSUE:         UAT:? .iusL/i-"; :u;        ALLEN
 ISSUE:         WETLANDS
 PREDICTION:    NU  SEWERS  -WILL be. CONSTRUCTED ON WETLANDS,COASTAL ZONES  ,WILD  AND  SCENIC RIVERS OR OTHER AREAS
 FINDINGS:      NO  CONSTRUCTION DON: ON WETLANDS.
                                                                                               56
    S FINDINGS:  THFPC  WAS  MC  ciFFEPi-HCc IM PREDICTION VERSUS ACTUAL.NO OTHFR  WETLAND PSRAMETERS EFFECTED
                 MC  W-TLAMOS  IN SCGPu AND A'tA QF CONSTRUCT ION.

-------
                   AS  PREDICTED  TO  BETTER  THAN  PREDICTED
                         

CITY                  GRANTEE                             COUNTY                ST  RIVER BASIN         NEPACYR)
— — V — — — -. —.. — ———..»..»_......_———— —— ——————— — «-——•"— — ————«•"•——-•»—.»— —— — »..„._—,...___«._».»_» »_«•_•_•—*W »_»•••.*.«
HONROEVILLE           MONROEVILLE,SWG  DISPOSAL AUTH       ALLEN                 IN  MAUMEE RIVER BASIN  1980     57
 ISSUE.:          W^TLANOS
 PREDICTION:
 FINDINGS:       NO KNOWN  WETL«NOS  IN  AREA  AFFECTED  BY  CONSTRUCTION.


 MOPE FINDINGS:  NO CHANGE  IN WETLANdS.



ADA    .               ATA  SEWAGE  TREATMENT  PLANT         HARDIN                OH  MAUMEE RIVER BASIN  1976     58
 ISSUE:          WCTLANPi
 PREDICTION:
 FINDINGS:       NO WFTLANCS  WE
-------
C6AUG87            AS PREDICTED TO BETTER THAN PREDICTED
                        COY RrviiR BAS:N)

CITY                 GPANTE:                            COUNTY                ST  RIVER  BASIN

 MOR= FINDINGS: NO IMPACTS WERE PREDICTED OR IDENTIFIED FOR WETLANDS  ISSUES.
                                                                                                     NEPft(YR)
TCLEOC               TOLEDO-WALB9ICGE                   WOOD                  OH  MAUMEE  RIVER  BASIN   1980      63
 ISSUE:         WETLANDS
 PREDICTION:
 FINDINGS:


 MORE FINDINGS: NO WETLANO? ISSUES ADDRESSED,  NO IMPACTS FQUNO.



TOLEDO               TOL=OO,CITY OF  OAYVIEW)           LUCAS                 OH  MAUNEE  RIVER  BASIN   1980      6*
 ISSUH:         WETLANDS
 PREDICTION:     W^TLAHDS WILL NOT  ^^^^^^^^ ^Bk^^^^^^^^^^^^^^^^^^^^aBBB ••••••••••••• •-«-••••••
UNIOPQLIS     !       UNIQP^LISiVILLAGE ?JF       •        AUOLAIZE              OH  MAUME5  RIVER  BASIN   1977      65
 ISSUH:         wffTLiiirs
 PREDICTION:     HO ENVIRONMENT SLLY S'-HS:TIV= AP>. AS  :N  PLANNING  »R = a.
 FlhOINGS:      NO KNOWN IMPACTS HIVE  OCCU»R?D.


 MORF FINDINGS:  NO IMPACTS EVIDENT



FUSHF09D             RUSHPn?D,CITY OF                   FILLMOPE              HN  UPPcR MISSISSIPPI    1980      66
 ISSU=:         WiTLANOj
 PREDICnflN:
 FIUDI'IGS:      NO APPAR = I|T IMPACT ON  WETLAND. NO WETLANDS EVIDENT  NEAP PLANT.
                CONTINUOUS DISCHARGE  IN HIGH HAT^R  CONDITIONS COULD CONTRIBUTE TO  WETLAND  POTENTIONAL.

 MORE FINDINGS:  NO WETLAND? AF(=ECTCO  BY NSW PLANT,  ALTHOUGH  CONTINUOUS DISCHARGE TO  RIVER  THROUGH  DITCH  COULD
                POTENTIALLY CREATE MFW WETLAND CURING  PERIODS OF  HIGH WATER.


ALMA                 ALMA MUNICIPAL  WASTEWATF.R TRMT PLT BUFFALO               wi  UPPER MISSISSIPPI    ma      67
 ISSUE:         W2TLANOS
 PREDICTION:     TH=RE WILL a^ NO IMPACT AS THE FORCE MAIN AND OUTFALL SEWER  WILL BE  BUILT  IN  THE  EXISTING RIGHT-OF-WAY
 FINDINGS:      NO IMPACT TO WETLANDS  HAS OCCURRED.


 MORE FINDINGS:  NO IMPACT TO WCTLANOS  'IAS OCCURRED.



,«UGUST£              AUGUSTS,CITY'OF                    €AU  CLAIRE            WI  UPPER MISSISSIPPI    1977      68

-------
CITY
 ISSU;:
 PREDICTION:
 FINDINGS:
   A3 PPEOTCTIO TO P'TTE" THAN PREDICTED
        
-------
06AUG67
cm
AS PREDICTED TO BETTER THAN PREDICTED
     (tlY RIVER BASIN)


  GRANTEE                            COUNTY
                                                                              ST RIVER BASIN
NEPA(TR)
(IE SOTO              o'SOTO,VILLAGE OF                   VERNON/CRAWFORO      wi UPPER MISSISSIPPI   1978     7*
 ISSL'i:         WETLANDS
 PREDICTION:
 FINDINGS:      PLANT NOT LOCATED  IN  WETLAND  c  NO ADDITIONAL FILL NEEDED FOR PLANT IMPROVEMENTS.


 MOKE FINDINGS: PLANT NOT LOCATED  IN  WETLAND  t  NO WETLANDS  AFFECTED BY PROJECT.




FOUNTAIN CITY        FOUNTAIN  CITYtCITY  Oc               BUFFALO              MI UPPER MISSISSIPPI   1979     75
 ISSUE:         WETLANDS
 PREDICTION:
 FINDINGS:      NO WETLANDS IN  IMMEDIATE  AREA.NO  EFFECTS NOTED.


 MORE FINDINGS: NO WETLANDS in  THE  IMMEDIATE  AT-A.




PLUM CITY      .      PLUM CITY,VILLAGE OF               PIERCE               WI UPPER MISSISSIPPI   1979     76
 ISSUE:        i w:TLAh[)3
 PREDICTION:
 FINDINGS:


 MORE FINDINGS: NO MHTLANCS W;R£ AFFECTLO BY  THIS PSOJKT.



STRUM                STRUM,VlLLAGc  OF                    TR CMP'iAL': All          WI UPPER MISSISSIPPI   198)     77
 ISSU::         HCTLAflo;
 PREDICTION:
 FINDINGS:



 MORE FINDINGS: '•.«..««.««. »•« — <. — —_»«>« — — .....«....• —-.» — — — —« — — — — ••» —— — — ^-••« — —•••^«
CASS                 SAGINAW COUNTY WTP                  TUSCOLA              MI SAGINAW RIVER BASIN J977     79
 IS5UE:         WETLANDS
 PREDICTION:

-------
P6AUG87
CITY
 FINDINGS:
                  AS PREDICTED TO BETTER THAN PREDICTED
                       (BY RIVER BASIN)
                    &RANTEC
               NO IMPACTS OBSERVED
COUNTf
ST RIV5R BASIN
NEPA(YR)
 HORE FINDINGS:
HOLLY                OAKLAND COUNTY OPW                 OAKLAND              HI SAGINAW RIVER BASIN 197T     80
 ISSUE:         WETLANDS
 PREDICTION:    THERE MILL NOT BE ANY DEGRADATION OF WETLANDS.
 FINDINGS:      DEGRADATION OF WETLANDS DID NOT OCCUR.


 MOFF. FINDINGS:



TITTAEAWASSEC "UP    TITTARAWASSEE TUP UUTP             SAGINAW              HI SAGINAW RIVER BASIN 1979     81
 ISSUE:         WETLANDS
 PREDICTION:    TUT PLANT EXPANSION WILL NOT RESULT IN THE DESTRUCTION OF ANY WETLANDS.
 FINDINGS:      NO WETLAND IMPACTS RESULTED.


 MORt FiriDINGS:
                                                •                • i


FOPT WAYNE           FOPT WAYNE,CITY 3F (SEWERS)        ALLEN                IN HAUMEE RIVER BASIN  1980     82
 ISSUE:         FLOCDPLAINS
 PREDICTION:    A GRANT CONDITION TO ASSURE CONTINUATION AND ENFORCEHENT OF THE "NO BUILD" ORDINANCE ON THE FLOOOPLAIN
 FINDINGS:      NO CONSTRUCTION DONE ON FLOODPLAINS.


 MPP.E FINDINGS: CONSTRUCTION THROUGH FLOODS A ItJS WOULD HAVE BEEN L?SS EXPENSIVE BUT LOCAL LAWS PROHIBIT THIS.



MONRCEVILLE          MONROFVILLE,SWG DISPOSAL AuTH      ALLEN                IN MAUMEE RIVER BASIN  1980     93
 ISSUE:         FLOOPPLAINS
 PREDICTION:
 FINDINGS:      THE FLCCOPLAIII HAS NOT CHANGED AT ALL DUE TO CONSTRUCTION.
                ONLY SHALL A9'_A 1PQUND LAGOON IS SUSCEPTI9LE TO ADDITIONAL FLOODING BUT NO HAZARD TO PEOPLE EXISTS.

 HORE FINDINGS: NO SIGNIFICANT CHANG? IN FLOOOPLAINS DUE TO CONSTRUCTION.



ADA                  ADA SEWAGE TREATMENT  PLANT         HAQDIN               OH HAUHEE RIVER BASIN  1976     84
 ISSUE:         FLOOOPLAINS
 PREDICTION:
 FINDINGS:      THE PREVIOUS PLANT WAS BUILT ABOVE  THE FLOODPLAIN.EXPANSION is ALSO ABOVE FLOODPLAIN.
MORE FINDINGS: BOTH OLD
                             MEW TREATMENT FACILITIES ARE ABOVE THE FLOCDPLAIN.

-------
CITY
                   S Pr'EOICTiO TO BETTER THAN P?EDICT=0
                       
-------
C6AUG87
AS PREDICTED TO BETTER THAU PREDICTED
     (BY «IV£R BASIN)
CITY


 MORE FINDINGS: PREDICTION WAS ACCURATE.
                                     COUNTY
ST RIVER BASIN
                                                                                                    NEPA
-------
C6AUG87
                   AS PREDICTED TC BETTER THAN PREDICTED
                        CiiY «:vrR RASIN)
CITY                 GRANTEE                            COUNTY                ST  RIVER BASIN
 ISSUE:         FLOOOPLAIUS
 PREDICTION:    THE FLOOD HAZARD .HILL *= ABATED DUE TO NEH  LOCATION  OF  PLANT.
 FINOIMGS:      TH? PRESENT FACILITY  IS LOCATED HELL  ABOVE  THE  100-YEAR FLOOD  ELEVATION.
                                                                                                     NEPACYR)
 MOR= FINDINGS: TH? PROJECT DID MITIGATE THE  FLOOD  HAZARD.
AUGUSTA
. ISSUE:
: PREDICTION:
 FINDINGS:
                                                         EAU  CLAIRE
                     WI UPPER MISSISSIPPI    1977
     AUGUSTA,CITY OF
FL'OOOPLAINS
ADDITIONAL UNITS HILL BE FLOOD PROTECTED TO  2  FT  ABOVE  REGIONAL  FLOOD  LEVEL  OR  LOCATED OUT OF FP.
PLANT is STILL LOCATED IN FLOODPLAIM.
EACH UNIT AT THE PLANT IS PROTECTED °Y CONCRETE CURBING.
THE PLANT SITt ITSELF IS NOT PROTECTED BY A  DIRE.
 MORS FINDINGS: THE PLANT UNTTS  ARS  PROT-CTEO  BY  CURRING  BUT COULD STILL BE THREATENED BY FLOODMATERS.
BANGOR
 ISSUE:
 PREDICTION:
 FINDINGS:
                                                                              HI  UPPER MISSISSIPPI
                                             1978
           •VILLAGE OF                  LACROSSE
cLOQr>PLAINS
NO DrTSIMENTAL EFFECT ON OR BY FLOODPLAIN

SOME ADDITIONAL FILL REQUIRED TO PROVIDE SPACE  FOR  ALL  NEH  FACILITIES.

PLANT SITE A30V£ REGIONAL FLOOD ELEVATION. ACCESS  FROM  ROAD GRADE  ALSO  ABOVE REGIONAL FLOOD.
                                                                                              98
 MORE FINDINGS* PLANT LOCATED  ON  ELEVATED  SITE  OF OLD PLANT AND LOG PILE. SOME ADDITIONAL FILL HAS REQUIRED. BUT NO EV
              1  ID=NCE  THAT  IT  RAISED FLOOD  EL?V-»TION.  PLANT MORE THAN Z FEET ABOVE REGIONAL FLOOO.
BARRON               fARRON.ClTY  QF                      BARPON
 ISSUE:         FLOODPLAIliS
 PREDICTION:
 FINDINGS:      PIVER CHANMLL  NOT AFFECTED  PY  PIPI  CROSSINGS.
                PLANT LCCAT.O  OUTSIDE  OF  CLOOPPL»IM.
                                                                              HI  UPPER MISSISSIPPI
                                             1980
                                                                                                               99
 MOPE FINDINGS: NO IMPUT ON FLOOOPLAIN.
PIRCHUOOD
 ISSUE:
 PREDICTION:
 FINDINGS:
                     BIRCHUOOOtVILLAGE CF
                FLOODPLAINS

                SITE NOT IN A FLOOOPLAIN
                SITE LOCATED HIGHER THAN  OLD  PLANT.
UASHBURN
                     HI UPPER MISSISSIPPI
                                                                                     1982
                                                                                              100
 MOPE FINDINGS: APOVE OLD PLANT,  NO  EFCECT  ON  FLOODPLAIN.
6RUCF
 ISSUE:
 PREDICTIONS
 FINDINGS:
                                                         RUSK
                                                                              HI  UPPER MISSISSIPPI
                                             1980
                                                                                              101
     KRL'C :,VILLAGE Of

FL10CPLAINS
FACILITY IN FLOODPLAIN,BERMS  HILL HAVE 2  FT  MINIMUM  CLEARANCE  ABOVE 100 YEAR FLOOO ELEVATION

MARSHLAND AtlO ACCESS ROAO TO  SITE UtRE FLOODED  IN  OCTOBER  1985 BUT MATERS DID NOT REACH LAGOON BERMS.

CCPM? WPPE EL;VAT£0 3 FT HIGHER THAN  OLD  PERMS  TO  PROTECT  AGAINST 100  YR FLOOD ELEVATION AS PLANNED.
 MORE FINDINGS: NEW SITE  is  SMALLER  THSN  OLD  LAGOONS,   THEREBY IMPACTING FLOOD FLOM LESS THAN BEFORE

-------
C68UG87
CITY
                     5  PREDICTED TO  BETTER  THAN PREDICTED
                         (3Y  PIV..R  BASIN)

                      GPANTEi                             COUNTY
                                                              ST  RIVER  BASIN
                       NEPA(VR)
BUTTERNUT
 ISSUE:
 PREDICTION:
 FlhDIN&S:
 MORf CIMOINGS!
                                        ASHLANO
WI UPPER MISSISSIPPI   1981
                      BUTTHPHUT,VILLAGE OF
                 FLOCOPLAINS
                 EXISTING  PONOS HILL Be RAISED.  THIS ACTION WILL CAUSE NO CHANGE IN FLOOD PROFILE
                 POND  DIKES  RAISED TO ABOVE  FLCOOWAY ELEV.
                 OPCRATDRS  010  NOT INDICATE  ANY  PROBLEMS FROM FLOODS.
                 SURROUNDING  AR=A  NORTH OF CREEK  IS LOWER THAN PONOSt BRIDGE OVER CREEK RESTRICTS FLOODPLAIN
                 PONDS PROTECTED FROM FLOODS.  PROJECT DOES NOT IMPACT FLOOOWAY
                                                                                                               102
COPNHLL
 ISSUE:
 PREDICTION:
 FINDINGS:
 MORE FINDINGS:
                                        CHIPPEWA
WI UPPER MISSISSIPPI
                                                                                                     1980
                                                                                                               103
     COFNELL.CITY OF
FLOODPLAIUS
NO IMPACTS ON FLOOD ELEVATIONS IN CHIPPEWA EXPECTED.OUTFALL  CONSTRUCTION  IMPACTS  WILL BE  RESTOREOtETC,
TH= PL*llT IS LOCATED OUT OF THE FLOODPLAIN AND HAS HAO  NO  FLOODING  PROBLEMS.
CONSTRUCTION OF THE OUTFALL HAS HAO NO ADVERSE IMPACT ON THE FLOOOPLAIN.
TH5(?E IS 4 SUFFICIENT CHANGE IN ELEVATION TO PREVENT BACKFLOW PROBLEMS  DURING HIGHWATERS
TH = PLAliT HJS HAD NO IMPACT ON THE FL01PPLAIN AND TS REMOVED FROM FLOODING  PROBLEMS
CUMBERLAND
ISSUE:
PREDICTION:
FINDINGS:
CUMB :?L
FLOOPPLAINS
, FLOW WILL IN
NO t(OTICEA«L
AN
CF
O.CITY DF
=A?= TO HAY
U:C»FiS£ IN
8ARRCN
RIVER.
RIV3R F4.0W.
WI UPPER MISSISSIPPI 1978

                                                                                                               10*
 M3RF FlflDTNCS:
                                                         VHRNON/CRAMFORD
                                                             WI  UPPER  MISSISSIPPI    197*
                                 105
DE SOTO               0=SOTO,VILLAGE  OF
 ISSUE:          FLOOOPLAINS
 PREDICTION:     PLANT  :XPAN:ION «AV  PEOUIRF  AODITIQNAL  FILL
 FItlClMGS:       PL«HT  FLEV4TION 633.  HtGIOHAL  FLOOD =LfVATION AT 634.5. ALL EXCAVATION AT SITE ABOVE FLOOD LEVEL.
                 NO N::W  FILL HAO TO a? us'o  IN  BUILDING  ii=w PHUT.

 MORE FINDINGS:  NO ADDITIONAL  PILL RPQUIREO  AT EXISTING SITE TO BUILO "es. ALL FACILITIES WELL ABOVE 10:  YR  FLOOD  LINE
                 OLD  FILL PLACID III 1966  WAS  SUFFICIENT.
FOUNTAIN CTTY
 ISSUE:
 PREDICTION:
 FINDINGS:
                                        3UFFALO
WI UPPER MISSISSIPPI
                                                                                                     1979
106
     FOUNTAIN CITY,CITY OF
PLOOOPLAIMS
CONTROL «UILOIMG MUST BC PROTECTED  TO  z«  ABOVE  FLOPO  LEVEL.NEW UNITS WILL BE CONSTRUCTED AT THIS ELEV,
NEW CONSTRUCTION IS WITHIN THc FLOODPLAIN.   HI  OTMfR  34SIC  FOR COMPARISON.
FLOOD SAF2GUA30S A": IN PLACE: NtA^BY  RAILPOAO  9;RM  PROTECTS PLANT tA PLUG  PREVENTS BACKFLOW
9ACKFLOW THPOUGH TM£ OUTFALL PIP=.
 MORE FINOINCS:  FLOOD  PROTECTION  IS  IN  PLACE  FOtf  FACILITIES IN FLOODPLAIN.
PHILLIPS
 ISSUE:
 PREDICTION:
                                        PRICE
WI UPPER MISSISSIPPI
                                                                                                     1980
107
     PHILLIPS,CITY OF
FLOODPLAINi
PART OF TH: SITE WILL REQUIRE FILLING  ABHVE  100-YR  FLOOOPLAIN.  NO OISCERNABLE EFFECT ON 100-YR FLOOD    •%

-------
 06AUG87            AS PREDICTED TO BETTER THAN PREDICTED
                        (Of PIVER BASIN)


 CITY                 GRANTED                            COUNTY
 FINDINGS:      NO EVIDtNCr OF FLOODING IMPACTS AT SIT = OR NEARBY.
ST RIVcR BASIN
NEPA(YR)
    ? PINOINGS: FLOODMAY NOT AFFECTED
PLUM CITY            PLUM CITY,VILLAGE OF               PIERCE               WI  UPPER  MISSISSIPPI    1979      108
 ISSUE:         FLOODPLAINS
 PREDICTION:
 FINDINGS:


 MORE FINDINGS: TH= PLANT is .LOCATED ON THE ORIGINAL SITE. ABOVE THE FLOOOPLAIN.



ST. LOUIS            ST. LOUIS, CITY OF                 GR4TIOT              MI  SAGINAU  RIVER  BASIN  1976      109
 ISSUE:         FLOOPPLAIHS
 PREDICTION:
 FINDINGS:      NO ADVERSE :FF=CTS HAVE OCCURRED.


 MOPE .FINDINGS?

               i

CAS5                 3AGIN&M COUNTY WTP                 TUSCOLA              HI  SAGINAU  RIVER  BASIN  1977      110
 ISSUE:         FLOOOPLAINS
 PREDICTION:
 FINDINGS:      NO IMPACTS IDENTIFIED.


 MORE FINDINGS:



DURAND               DURAND.CITV OF                     SHIAUASSE:           MI  SAGINAM  RIVER  BASIN  1976      ill
 ISSUE!         FLOODPLAIhS
 PREDICTION:
 FINDINGS:      PLANT IS A80V. 100 YEAR FLOOD LINE.


 MORF FINDINGS:



HOLLY                CAKLANO COUNTY OPU                 OAKLAND              MI  SAGINAU  RIVER  BASIN  1977      112
 ISSUE:         FLOODPLilNS
 PREDICTION:
 FINDINGS:      ALL NEW CONSTRUCTION W43 OUTSITE THE 10C-YR FLOOD LIMITS.
 MORE FINDINGS:

-------
06AUG87
AS PREDICTED TO BETTER THAN PREDICTED
     (SY RIVER BASIN)
CITY                  GRANTEt                             COUNTY               ST RIVER BASIN         NEPA(VR)
* — — — ...— —-.— • — -.._._.«._._.._«»..._„..,.„._.„— — — —.— — .. — — — — — — — — — •«• — —•— — —— — — — — — »—.» — ..—.— — — -..-.»•»•—•—» _..._ _..__H»_.._B.WV__*I>
HOWELL                HPMELL.CITY  OF                      LIVINGSTON           HI SAGINAW RIVER BASIN 1976     113
 ISSUE:          FLODOPLAINS
 PPEDICTION:
 FINDINGS:       REDUCED  RISK  OF FLOODING OCCURRED  AS A RESULT OF CHANNELIZATION.


 MORE FINDINGS:



LAPEER                LAPEER.CITY  OF                      LAPEER               MI SAGINAM RIVER BASIN 1976     11*
 ISSUE:          FLoaopLAtns
 PPEOICTIOU:
 FINDINGS:       AS A  RrSULT  OF  PLANT  EXPANSION  A  NEW HIGH FLOW CHANNEL FOR
                 THC  SOUTH  UFANCH  OF THE FLINT RIVER  WAS CONSTRUCTED ON
                 Thu  OPPQSITC  B4HK OF  THC. RIVSR.
 HOPE FINDINGS:



TITTABAWASScE TUP     TITTABAWASSE£ TWP  WWTP              SA&INAW              HI SAGINAW RIVER BASIN 1979     115
 ISSUE:          FL030PLAINS
 PREDICTION:
 FINDINGS:    .  FACILITY is NOT LOCATED IN THE IPC  YEAR FLOODPLAIN.


 MOPE FINDINGS:



FORT MAYNE            FCRT  W£Y!I=.,CITY OF (S = W3RS)         ALLEN                IN MAUMEE RIVER BASIN  1980     116
 ISSUE:          e,;oTA/tQuiTiC
 PREDICTION:
 FINDINGS:       TH?;R:  APP^KS  TO  BT AN  ENVIRONMCNTALLY SOUND HABITAT IN T.HE AREA.


 MOFF FINOTNGS:  GAML  FISH  (AVi  35':N FOUND  IN  HDUTH  OF MAUMEE RIVER WHICH IS ATTRIBUTED TO THIS CONSTRUCTION GRANT
                 AND  A GRANT  TO  UPGRADE  TH£ FORT  WAYNE WATER TREATMENT PLANT.


FORT W6YN£            FORT  WAYIJ-.CITY  Of CS5WERS)         ULLcN                IN MAUMEE RIVER BASIN  I960     117
 ISSUE:          BIOTA/RAR:ttNO.THR
 PREDICTION:
 FINDINGS:       THERE ARE  NO  ENDANGERED SPECIES  IMPACTED BY CONSTRUCTION.


 HOR!! FINDINGS:  NO NOTICEABLE  EFFECT  ON ANY  ENDANGERED SPECIES FOUND.



FORT WAYNE            FORT  WAYN-?,CITY  OF (SEWFRS)         ALLEN                IN MAUMEE RIVER BASIN  1983     118
 ISSUE:          PIOTA/T^R
 PREDICTION:
 FINDINGS!       THSRE  APPEARS  TO  8E AN  ENVIRONMENTALLY SOUND HABITAT IN THE AREA.

-------
06AUG87
                  AS PREDICTED TO BETTER THAN PREDICTED
                       C3Y RIVER BASIN)
CITY                 GRANTEE                            COUNTY                ST RIVER BASIN         NEPA(VR)

 MORE FINDINGS: NO HOTICEA«L? OIGRADATTCN OF TERRESTRIAL LIFE WAS  FOUND OR  DOCUMENTED ACCORDING TO MR.EMBURY OR MYSELF
HONROEVILLE
 issue:
 PREDICTION:
 FINDINGS:
     MON30EVILLE.SWG DISPOSAL AUTH
                                                        ALLEH
                                                                              IN MAUMEE RIVER BASIN  1980
                                 119
               IMPROVE WATLR JUALITY OF THE MAUMEE  RIVER.
               A NEW HABITAT rXISTS FOR AQUATIC LIFE  INCLUDING  FISH  IN THE  NEW LAGOONS.
               NO'SIGNIFICANT CHANGE IN MAUMcr RIVER  AUUATIC  LIFE  BECAUSE  OF THIS GRANT.
 MORE FINDINGS: MAUM.FC F.IV^R AQUATIC LIFE DID NOT  IMPROVE  SIGNIFICANTLY  BUT  CONSTRUCTION OF THE LAGOON SYSTEM AND
                STOCKING TH~ UATTR WITH FISH HAS AOJED  HEALTHY  AQUATIC  HABITAT IN MONROEVILLE AREA.
KONPCrVILLE
 ISSUE:
 PREDICTION:
 FINDINGS:
                                                        ALLEN                 IN MAUSEE RIVER BASIN  19BO     120


               NO ENDfttiGERiO SPECIES HAVE  ENTERED  THE  AREA  OR  BECOME  ENDANGERED BECAUSE  OF THIS CONSTRUCTION.
     MQNROrVlLLE ,SWIi DISPOSAL AuTH
HIOTA^PAP-I.LND.THP
 MOKE FINDINGS: NU CHANG? T0 ^NOAfJGERED  SPECIES  BECAUS"  NONE  PRESENT  IN  AREA.
ADA
 ISSUE:
 PREDICTION:
 FINDINGS:
                    A?A 3:HA»T TREATMENT  PLANT
                                        HARD IN
OH MAUSEE RIVER BASIN  1976
               MOTA
               IMPROVED WATER QUALITY WILL  RESULT  IN  IMPROVED  WILDLIFE  HABITAT
               NO IMPACT WAS NOTCO ON LOCAL CPTPS  OR  WILD  VEGETATION.
               SOMt  iMALL FISH HAV£  RETURNED TO GRASS  «?UN  CREEK.
MORE FINDINGS: NO IMPACTS
                                PREDICTED OR NOTED.
                     CR:D:PSVILL=,VILLAGE TF
                                                        AUGLIAIZE
                                                             OH  MAUMEE  RIVER  BASIN   1977
                                 122
CRIDHRSVILLE
 ISSUE:          BIOTi
 PREDICTION:    STREAM WILL PROVIDE SPAWNINGO HABITAT FOR  SMALL  FISH.  NO  EFFECT  ON  OTHER WILDLIFE,EXCEPT MAYBE RABBITS
 FINDINGS:       FISH HAVE ^TURNED TO  STREAM - MINNOWS.  BLUEGILLS,  TURTLES.
 MORE FINDINGS: FISH HAVE RFTURNED TO STREAM
HARROD
 ISSUE:
 PREDICTION:
 FINDINGS:
                    H4R300,VILLAGE OF                   ALLEN
               BIOTA

               PLANT WILL BE BUILT ON SIT5  PREVIOUSLY USED  AS  WOODLAND.
               MINNOWS HAVc R=TURN=D TO THH  STRtAM.

               19 ACR^S OF LAND PURCHASED.   5 ACRES  OF  WOODLAND  USED  FOR  CONSTRUCTION.
                                                             OH  MAUSEE  RIVER  BASIN  1977
                                 123
 MORE FINDINGS: MINNOWS HAVE 9EtN SEEN IN STREAM.
                PLANT CONSTRUCTION ON PREVIOUS WOODLAND  SITS.
KALIDA
                                    OF
                                                        PUT*|AM
                                                              OH  MAUM5E  RIVER  BASIN  1976
                                 124

-------
P6AUG87             AS  PREDICTED TO  SETTER  THAN PREDICTED
                         Or  S'VrrR  «ASIN)

CITY                 GtiANTcd                             COUNTY
 ISSUE:          "I3TA/SOUATIC
 PREDICTION:     SHORT  TLRM  EFFECTS  ON PLUM CREEK  BIOTA DUE TO CONSTRUCTION.
 FINDINGS:       CPEEK  APPEARS  CLEAR-NO LONG-TERM  IMPACTS NOTED.
                                                                             ST RIVER BASIN
                                                                                                    NEPA(YR)
 MORF FINDINGS:  NO  LONG-TERM  IMPACTS  FROM  CONSTRUCTION HERE NOTED.
MONTPELIEP            MONTPELIER  SWG  TRT  PLT              WILLIAMS             OH MAUMEE RIVER BASIN  1980     125
 ISSUE:          BIOTA
 PREDICTION:     INDUCED  DEVELOPMENT  MAY  RESULT  IN THE DESTRUCTION OF POTENTIAL WILDLIFE HABITAT
 FINDINGS:       THERE  Af:F  APPARENTLY NO  DESTROYED WILOLIFE HABITATS DUE TO THE CONSTRUCTION PROJECT.
                 CY  FRINGING  4  SEPARATE HOSPITAL TREAT. SYS. ON-LINE TO WWTPt AREA STREAM HOLLUSK LIFE HAS IMPROVED.
                 NU  DEVELOPMENT HAS OCCURRED  WHICH HAS AFFECTED WILDLIFE
    v FINDINGS:  NO  WILDLIFE  0:STROY ED,INCORP.  OF SFPAR4TE DISCHARGERS T9 WWTP HAS IMPROVED SOME SPECIES POPULATIONS.
                 SLTSEUUfNT MINOR  DEVELOPMENT HAS NOT  AFFECTED WILDLIFE
NAPOLEON
 ISSUE:
 PREDICTION:
 FINPINGS:
                    NflPOL-L/N
                                                        HCHRY
                                                                              OH MAUMEE PIVER BASIN  1977
                                126
MORE FINDINGS: NO r»cD;CTutts WERT  MHO?
                                                    AQUATIC  OP TERRESTRIAL BIOLOGIE S.NO IMPACTS TO AQUATIC OR
                 TERPESTPIAL  WILOLIFH  HAS  3E£.N  NOTED.
                                                                              OH MAUMEE RIVER BASIN  1376
                                                                                                             127
RIDG»:VILLE CORNERS   H = liRY COUNT Y( "IDGEVILLE COPHERS)    H^NRY
 ISSUE:         ?:OTA
 PREDICTIOH:    TH: P;OPO;;D  JCTICN  WILL HAVE  SOM:  BENEFICIAL  EFFECT ON AQUATIC BIOTA & HABITAT
 FINPIMGS:      THFR= AFE NO  CUPPHNT  P^DPLEMS  WITH  THE  HABITAT.
                THERE AR= GL-^O LU^REUT  BIOTA MONITORING «:COROS(T:FFIN PIVER)-THOUG i NO ACTUAL MONITORING OF DITCHES
                ThC ir-'A WHlrr. COIlSTPUCTION ACTIVITf CCCURfLO  W4S  t  IS WO.T  A PACTICULAR WILDLIFE HABITAT
 MOKE  FINDINGS: THOUGH CUK?-NT RTCORCJ  API  COCO,  THE«!E  IS  NO REAL  HONI TQtf ING DATA TO COMPARE PREVIOUS t CURRENT BIOTA
                WITH THL IMP?QVE3  TR E A TM.T ^4T , IT IS  LIKELY THAT  LESS SEVERE DISCHARGES HAVE HAD A BENEFICIAL EFFECT.
TOLEDO
ISSUE:
PPEDICTION:
FINDINGS:
TOLFDO-WAL&RIOGF WOOD
1 1 0 T A
PROJCCT WILL PRLVIDc AN ENVIRONMENT CONDUCIVE TO NATURAL
NO FLL"A OP MUNA WAS IMPACTED.
OH MAUMEE RIVER BASIN 198
BIOTA.
                                                                                                              128
 MCRF  FINDINGS:  STREAM  IMPACTS  HERE  BENEFICIAL  ^NC WITHIN THE MAGNITUDE EXPECTED.
UNIOPOLIS
 ISSUE:
 PREDICTION:
 FINDINGS:
                     UM:OPOLTS.VILLAGE  CF
               PIOTA
               AQUATIC  ECOLOGY  SHOULD
               NO  IMPACTS EVIDENT
                                                         AUGLAIZE
OH MAUMEE RIVER BASIN  1977
129
 MORE FINDINGS: no IMPACTS ;.V:OENT

-------
06AUG87
CITY
   AS PREDICTED TO BETTER THAN PREDICTED
        (?Y RIVE.R BASIN)


     GRANTS                            COUNTY
                     ST RIVER BASIN
NEPA(YR)
UESTON
 ISSUE:
 PREDICTION:
 FINDINGS:
     W'STON,VILLAGE OF                  WOOD                  OH MAUMEE  RIVER BASIN  1979
BICTA
THE PCCJECT MILL NOT IMPACT ENDANGERED SPECIES.
THERE ARE NO KNOWN PROBLEMS WITH ANY OF THE PLANT/ANIMAL  LIFE WITHIN THE PLANNING AREA.
                                                      130
 MORE FINDINGS: PREDICTION HAS ACCURATE.
RUSHFCRD              PUSHFCFIO.CITY OF                    FILLMOPE             MN UPPER MISSISSIPPI
 ISSUE:         BIOTA
 PREDICTION:    NO  IMFICT  is  EXPECTED  ON  ENDANGERED  SPECIES  OR SENSITIVE ENVIRONMENT AREAS.
 FINDINGS:      FLORA  NEAP  OUTFALL SEEM STABLE.  AREA  HAS ESEN USED AS TRASH DUMP IN PAST.
                PLANT  siTf:  GRASS/ASPHALT.  AREA NEAR  OUTFALL  MOSTLY WEEDS.

 MORE FINDINGS: HC  APP8F.ENT CHANGES
                                                                                     1980
                                                      131
ALMA
 ISSUE:
 PREDICTION:
 FINDINGS:
     ALMA MUNICIPAL WASTSWATFR TRMT PLT BUFFALO               wi  UPPER  MISSISSIPPI
BIOTA
SOME TPcES ANO VEGETATION WILL 9fi: REMOVED: NO  ENDANGERED  SPECIES AR=  INVOLVED.
S3M; VtGFiTaTIOfl WAS RIHOVcD.
NU EUDAUGERtO SPFCI6S WERE INVOLVED.
                                            1980
         132
 MORE FINDINGS: TH=  ACTUAL  IMPSCTS  WERE  *s  PREDICTED.
AUGUSTA
 ISSUE:
 PREDICTION:
 FINDINGS:
                                                              WI  UPPER  MISSISSIPPI
                                            1977
     AUGUSTA,CITY OF                    EAU CLAI°>;
BIOTA
NO SIGNIFICANT WILDLIFE WILL 3E AFFECT'O BY Til? PROJECT.
NO HABITAT WAS AFFECTED BY THE PLAMT EXPAHSION.FISHING  AND  TRAPPING  HAVE  IMPROVED.
FISH PPESJNTLY CAUGHT DOWNSTREAM DO NOT HAVE  A FILM ON  THEIR  SCALES,  TASTE  BETTER  WHEN COOKED.
SOME CHANGS IN AQUATIC PLANT 3PECIES.MOPE DIVERSITY.
         133
 MOR* FINDINGS: NO HABITAT was DISTUR9 = 0.STR = AM  IMPROVEMENT  HAS  RESULTED IN HEALTHIER AND MORE ABUNDANT WILDLIFE.
BANGOR
ISSUE:
PREDICTION:
FINDINGS:
RAIiGO", VILLAGE CF LACROSSE WI UPPER MISSISSIPPI 1978 13*
«IGT A
NATIVE VEGETATION A$ WELL AS ANY ANIMAL HABITAT ASSOCIATED WITH THE SITE WILL
DUTCH CREEK STILL CLASS III TROUT STREAM. NO OTH€R CHANGES IN BI3TA NOTED.

BE LOST. MITIGATION

 MORE BINDINGS: NO SIGNIFICANT CHANGFS  IN BIOTA  NOTED  BY  INFORMANTS.  APEA NEAR PLANT is BANGOR PUBLIC HUNTING GROUND.
                TROUT FISH?KY "tPORTEO  "OK"
BARRON
 ISSUE,:
 PRFDICTIQn:
8IOTA.
     HARRQN.CITY OF
BARRON
                                                              WI  UPPER  MISSISSIPPI    1980
         135
     "RELOCATION OF SMALL GAME, m BALD E'AGLE  >?ESTS  IN  CONSTRUCTION  ARE*'

-------
P66UG87
CITY
 FINDINGS:
                   AS PREDICTED  TO  SETTER  THAU  PREDICTED
                              1V.;P 8ASIN)
                     GPiHT=£                             COUNTY               ST RIVER BASIN
                SITt AND  NCA"R3Y  WOODS  US^O  BY  BIRDSo  SMALL ANIMALS AND OEcR FOR MATER AND FOOD.
                                                                                                      NEPA(VR)
    ? FINDINGS: PLMJT  HAS  a  POSITIVE  IMPACT  ON  ANIMAL  AND BIRD LIFE.
                      e:eCHWOOO,VILLAGE  CF                WASHBURN             WI UPPER MISSISSIPPI    1982      136
 ISSUE:         8ICTA
 PREDICTION:    NO KNOWN RARE  SPECIES OF  PLANT  OR ANIMAL LIFE. VEGETATIONAL DAMAGE WILL BE CORRECTED  AFTER  CONSTRUC
 FINDINGS:      VARIOUS SPECIES  OF  BIROS  AND  ANIMALS  USE SITE FOP FEED ANO WATER.
                        D  Af^aS  HAVE  BtcN  R
 MORF FINDINGS: NO NEGATIVE  IMPACT  ON  BIOTA.
 ISSUE:
 PREDICTION:
 FINDINGS:
                         ::,VILLAGE  OF                    RUSK                 WI UPPER MISSISSIPPI    1983      137
                3IOTA/TLR
                WILDLIFt WILL  NOT  ES  SIGNIFICANTLY AFFcCTtO.NG ENOANGEREO SPECIES,MINIMAL DISTURBANCE  TO  VEGETATION
                4R»A (.>:STu&;'"D UURING  CONSTRUCTION WAS RESEEDF.O, SHOWED NO SIGNS OF CONSTRUCTION  DISTURBANCE.
                OcFF CCC4SlnNALLY  SE:N IN  OF^N HARSH AND WATERFOWL LAND AT SITE.
 HOP; FINDINGS:  SITE  is SURROUNDED  BY  LARGER  TRACTS  OF UNDISTURBED LAND, MINIMALLY IMPACTS BIOTA
CORNELL
 ISSUE:
 PREDICTION:
 FINDINGS:
 MORE FINDINGS:
                     CPPNcLL.C ITY OF                     CHIPPEWA             WI UPPER MISSISSIPPI    198C      138
                OIOTA
                NC ENDANGERED  ?P-CI=S  IN  ROUTE  OF  OUTFALL  EXTENSION. FOREST t OPEN SPACE MAYBE LOST FROM  EXPECT  GROWTH
                CONSTPUCTION OCCURRED  AT  EXISTING  PLANT  SO NO ADVERSE IMPACTS ON BIOTA.
                OUTFALL CONSTRUCTION HAD  NO  LONG TERM  IMPACTS AND IS REVEGETATEO.
                THERE HAS NCT  BEEN ANY LOSS  OF  OPEN  SPACE  CR WOGO:D AREAS AS A RESULT OF PLANT EXPANSION
                THtRE HE*;. NO  CFF£CTS  ON  3IOTA  AS  THE  EXPANSION nCCUD^FD AT THE EXISTING, CLEARED SITE
                A LOSS OF OPEN SPACE HAS  NOT  RESULTED  AS OF THIS POINT IN TIME
CUMOCPLANO
 ISSU;:
 PREDICTION:
 FINDINGS:
CUMB^LANO.CITY OF
BA9RON
                                                                              WI UPPER MISSISSIPPI
                 SOME  WILDLIFE  WILL  6E  TEMPORARILY DISPLACED OR FORCED TO RELOCATE.
                 VILDLI^c  NTT  J°SERV;0. SITt LOOKCD SUITA3L; FOR SMALL ANIMALS AND WETLAND  BIOTA.
                                             1978
139
 MflRS FItlOINGS:  SITC  APP:A"S  SUITABLE  FOR  VARIOUS  WILDLIFE.
DE SOTO
 ISSUE:
 PREDICTION:
 FINDINGS:
                             VILLAGE  CF                   V= RN3N/CPAWFORO      WI UPP=R MISSISSIPPI    1978      1*0
                 3IPTA

                 "CMOVAL  OF  STM^  GRASS  ANO BRUSH ADJACENT TO EXISTING FACILITY.
                 NO  HEW LAIJO WAS  NEEDED  FOR PLANT EXPANSION. MUCH OF OLD FILL AREA  STILL GRASS  I  BRUSH.
                 niSMTfJG  IN  SUMMER  NiAR  PLANT OUTFALL.  MUSK RAT IN PLANT VICINITY. MAY FLIF.S 8AO BECAUSE  OF  HIGH WQ.
 MORE FINDINGS: NO NOTED ITICT ON  SIOTA  IN  VICINITY  OF  PLANT

-------
C6AUG87
CITY
                   AS PREDICTED TO SETTER THAN PREDICTED
                         rllfiOS FR'QU'tNTLY U£F THE SITE FOR WATER FEEDING.
                                                                             WI  UPPER  MISSISSIPPI
                                                                                1980
                                                                                              146
                                                                            RELOCATION  OF  SOME  SPECIES

-------
                   AS
                               O  TP  BETT=K  THAN PREDICTED
                          ,5 Y  P I V •; R  BASIN)
CITY                 Gf.'AMTE,.

 MORE FINDINGS:  SITE HAS
                                                         COUNTY

                                sr  HABITAT  OF SDH?  SPECIES
ST RIVER BASIN
NEPA(YR)
STRUM                 STMJM.VILLAGE  OF                    TREHPEALEAU          HI UPPER MISSISSIPPI   198D      147
 ISSUF:          BICTA/t^UATIC
 PREDICTION:     THERE  WILL  DE  A  FAVORABLE  IHPACT  ON THE QUALITY OF THE AJUATIC HABITAT
 FINDINGS:       FAVOPA8LE  U'PACT ON AQUATIC  HABITAT CONFIRMED.


 MOPF FINDINGS:  NO  UHPRIOICT10 IMPACT  HAS  OCCURRED BUT IMPROVEMENTS NOT NOTED.



WESTflY               H:3Try  STUAO?  TRfATMcNT PL6NT      VC?NON               VI UPPcR MISSISSIPPI   1979      148
 ISSUE:          flHTA
 PRIDICTION:     WILL  HCT SIGNIFICANTLY  AFFECT ANY PERENNIAL STREAM QUALITY OR FISH AND AQUATIC HABITAT.
                 C'-'F t  PAr,n:TS ,,OT  3EcN TNSIO;;  PLAHT F5MCF..NO CHAMOt IN FISH NOTED.


    r Finoinr-s:  NO  APPARENT  CHidCE  IN  PIQTA  OUTSIDE PLANT PENC^ ?UT SOME ANIMALS LIVE IN YEAR AROUND MVD NEAR OUTFALL.



ST. LOUIS            ST. LDUISt  CITY CF         •        GRATIOT              Ml SAGINAW RIVER BASIN 1976      149  :
 ISSUE:          eioTA
 PRtDlCTION:
 FINDINGS:       uo  AOV:RS   :PF-.CTS  HAV; occu"p':D.


 MCRE FINDINGS:



CASS                  iiOI'ISW CQU'.TV WTP                 TUSCOL&              MI SAGINAW RIVER BASIN 1977      150
 ISSUE:          eim*
 PREDICTION:
 FINDINGS:       U3  IMPACTS  CCCURPlfO


• MORE FINDINGS:



DUPANC-                LURANOiCITY OF                     SHIAWASS^           MI SAGINAW RIVER BASIN 1976      151
 ISSUE:          BIOTA
 PREDICTION:     AOUATIC AMD EIOLOGICAL LIFE  ENHANCED BY PROJECT.
 FINDINGS:       NO  QUANTITATIVE  INFQPMBTIQN  AVAILAeLc. HOWEVfRt PLANT PERSONNEL HAVE NOTICED TWO SPECIES OF BIRDS NO
                 T  sE^n PRIOH TO  PLANT  UPGRADE.

 MORE FINDINGS :  TH= CISCHARGr  Dr'AIN WAS CHANGED FRQM Trii HOLLY DRAIN TO THE SHIAWASSEE RIVER WHEN THE  PLANT WAS UPGR
                 AD?D.  KINGF:S.
-------
96AUG37             AS  PFEOICTijO TC cETTcR THAN PREDICTED
                         C'Y  ^;v;:? PASI4)

CITY                 G^ANTFf                             COUNTY                ST RIVER BASIN         NEPA(YR)
 ISSUE:          PIOTA
 PREDICTION:     THE  PK?JCCI  WILL NDT AFFECT WILDLIFE OR ENDANGERED  SPfCiESi  NOR CAUSE NUISANCE I
      IHGS:       yacLiFi rr.T  AFFECTED AND NO NUISANCE INSECT  PROBLEMS  HAVE  BEEN RELATED TO THE w


      FINDINGS:



LAPEFF               LAPEE°,CITY OF                     LAPEFR                MI SAGINAW RIVER BASIN 1976      153
 ISSUE:          BIOTA
 PREDICTION:     WILDLIFE WILL NOT BE AFFECTED ANO WILL R-MAIN IN  ITS  ORIGINAL CONDITION.
                 NC  IMPACT TO  WILDLIFE NOTED.
      FINDINGS:
        JASSEF  TWP     T!TTA°AW4SSE.: TWP WWT?              SAGINAW               MI SAGINAW RIVcR BASIN 1979
 ISSU£:.         'ICTA
 PREDICTION:     *ic  U?;:UUE  c-^MUNITIES, HABITATS OR OTHT?  FACTJRS  WILL  s;  SIGNIFICANTLY AFFECTED
 FINDINGS:     .  THT  PLSHT  n:n NLT P^SULT in ANY ACVERS-  IMPACTS TO


 MOPE FINDINGS:
FORT WAYNE            F2PT  W^vnc.CITY OF (ScweKS)        ALLEN                 IN MAUMEE RIVER BASIN  1983      155
 ISSUE:          soc:o/enPL:>Y
 PPEDICTIONS     TH2  PF.lJf-CT WILL HOT SIGNIFICANTLY  IMPACT  LONG-T'PM  EMPLOYMENT IN THE PLANNING ARfcA.
 FINDINGS:       -MPLCYM.'IT HIS D'COLASED SOMEWHAT OVER THE  PAST  t>  Y;»RS  8UT IT HAS NOT BEEN BECAUSE OF THE  GRANT.


 MORE FINDINGS:  THIS  G?ANT H»3 LITTLE OK NO IMPACT  ON THPLOYMENT  III  THE  SERVICE AREA.




FORT WAYNE            FORT  W,\Vi|-,CITy OF (SC.WFKS)        ALLEN                 IN MAUMEc RIVER BASIN  1980      156
 ISSUE:          SOCIC/'LANOUJ:
 PREDICTION:     NO  CONVERSION  IF AGRICULTURAL L^ND  TO ?:S:OF.NT!AL  us"  is  ANTICIPATED.
       IGS:       NO  ADDITIONAL  'ESICENTIAL AR'AS W=Si- C QNVH »T ED FfGM  cARHLAND BECAUSE OF SF.WER GRANT.
 MOF.- FIMOInC-s:  THr  PP'DICTION THAT FARMLAND WOULD NOT BE CONVERTED  TO  RESIDENTIAL USE WAS CORRECT.




FORT WAYNE            FPP.T  UAVMF.CITY OF (SEWHRS)         ALLEfl                 IN MAUMEE RIVER BASIN   1980      157
 ISSUE:          SOCIC/LANDU5:
 PREDICTIONS     THC  COMMIT^INT JF LAND WILL B:. MINIMAL SINCE THE  PPOJ1CT  INVOLVES ONLY THE RIGHTS-OF-W AY.
 FINDINGS:       THcRE  W^R;  fH  CHANGES FR1H THE It.jITIAL PROJECTIONS  SO NO  LAND HAS USED THAT WAS NOT  PREDICTED.



' MOR? FINDINGS?  THf  Uo.rt/  LA'!(n  HAS' ALL B;EN REPLANTED ANO'riD  ADDITIONAL  LAND WHICH'WAS Pfff.VIOUSLV UNOISTUR9FD  WAS

-------
06AU"->17            AS  Pf = DTCT£0  TC  BETTER  THAN PREDICTED
                        (9Y  RIVER  BASIN)

CITY                 G2ANTEI                             COUNTY               ST RIVER BASIN         NEPA(YR)
                013TUR1'.:-D WIT:l?UT  RETURNING IT TO ITS ORIGINAL CONDITION.


FORT  WtYNE           FORT WAYNE, CITY  OF 
-------
06AUG67            AS PI EOICTcO TO BETTER THAfl PREDICTED
                        (f.y O'.VrR BASIN)

CITY                 GRANTEt                            COUNTY                ST RIVER BASIN         NEPACYR)
 FINDINGS:      CUP RENT SEWCP CHARGES AR = iS.10 PER MONTH-LOWEST OF FIV~ PLANTS SURVEYED AROUND LIMA.


 MOPT FINDINGS: COST is NOT A SIGNIFICANT BURDEN-NO IMPACT MAS PREDICTED.



CRIDFRSVILLE         C RIDE 
-------
C6AUG87            6S  PPEDKT£0  TO  BETTER  THAN  PPfcOjCTEO
                        (FjY  DIVE" PASIN)


CITY                 GPANTEL                             COUNTY               ST RIVER BASIN         NEPACVR)
NAPOLEON              NAPOLEON                            HENRY                OH MAUMEE RIVER BASIN  1977     169
 ISSUE:          SOCIO/LANCUSF
 PREDICTION:     THE  UPGRADING  OF  THE  PLANT  WILL  UTILIZE  THE CURRENT PLANT SITE AND WILL INVOLVE NO LAND USE CHANGES.
 FiriDit'GS:       PLANT  EXPANSIONS  USE  EXISTING  LAND  WITHIN PLANT CONFINES,NO LAND USE CHANGES OCCURED.


 MORE FINDINGS:  NO LAND  us?  CHANGES HAV£  OCCURRED DUE  TO PROJECT CONSTRUCTION.



NAPOLEON              NAFOLCLN                            HENRY                OH MAUMEE RIVER BASIN  1977     170
 ISSUL:          socio/propvAL
 PREDICTION:
 FINDINGS:       PROPERTY V»LUCS ALONG  THE VAN-HYNING SEWFR LINE WEP= ESTIMATED TO HAVE INCREASED BY APPROX. zot.


 MORE FINDINGS:  NJ PPEDICTILN  w«<;  MADE  REGARDING THE 201 INCREASE in VALUE OF THOSE PROPERTIES ALONG THE VAN-HYMING
                 SiUEF  LINL
PIDG'CVILLE CC'KNrP.S   HCtm COUNT YC RIOGFVILLE  C03NE35)    H?NRY                 OH MAUMEE RIVER BASIN  1976     171
 ISSUE:         scciQ/EKPLflY
 PREDICTION:    COLLECTION SYJTEM EXCAVATION  WILL  CAUSE  TEMP.INCONVENIENCE  t A TEMPORARY LOSS OF CUSTOMERS FOR BUSIN.
 FINCI'IGS:      TH€ CF'RftnP CONFIRMED ONLY ONC  MJNOR  C3MPLAINT FROM A FURNITURE STORc RE: BLOCKING THE ENTRANCE.
               '.. THE CONiTR. ?t|Gi:ii:Ei* CONSULTED WITH  THE  STORE  OWNtR TO INSTALL THE LINES t REPAVE AS SOON AS POSSIBLE

 HOP1! FlNDlNC-i: PP;:DICT;i|| WAS ACCURATE  IN A  QUALITATIVE  SENSE, ALTHOUGH  THIS WAS THE  ONLY DISRUPTION RECOLLECTED



RIDGEVILLE CORNERS   HEIlOY C 3UNT Y( -BIOGEV ILL c  COPNE^i)    HENRY                 OH MAUHEE RIVER BASIN  1976     172
 ISSUE:         SDCIC/LANOU3E
 PREDICTION:    TH^ PPOPOJEO FACILITY WILL USE UP  SIXTEEN  ACRES N^AP. OWL  CREEK
 FltJOr'J&S:      Tit' PLANT C ON i TtfijC T F ON USLiO ONLY APPROXIMATELY  12  AC^ES OF  LAND.


 MOR' FINDINGS: LAND USED UP WAS LESS THAN THE AMOUNT  ANTICIPATEDOSX LESS)



PIOG«3VILLE CCRiliRS   HTIJPY C OUNT Y( PI OGEV ILLE  COPNERS)    HENRY                 OH MAUMEE RIVER BASIN  1976     173
 ISSUE:         SOCIO/SECOEV
 PREDICTION:    INOUCLD GROWTH MAY  TAKE  LAND  FO« AGRICULTURAL  usc  ALONG u.s. RT. 6 & STATE RT. 34
 FINDINGS:      MINIMAL <»S 110.NTIAL GROWTH HAS OCCURRED,  THOUGH TS INSIGNIFANT IN QUANTITY.
                THE AFEA IS(C  WAS)  RES IDE NT I ALLY ZONED

 MORE FINDINGS: THUS Ftf L&IIO  USFD  HAS BE=N THAT ZONCO RESIDENTIAL, NOT AGRICULTURAL.



TOLEDO               TOLEDO-U4Le?ICGE                    WOOD                  OH MAUMEE RIVER BASIN  1980     174
 ISSUE:         SOCIO/LANDUS11                                                                                     X
 PREDICTION:    PROPER LAND USF MANAGEM£'JT snouL1:  DISCOURAGE  DEVELOPMENT  IN AGRICULTURAL* ZONED AREAS.
 FINDINGS:      NO MAJOR TRACTS OF  AGRICULTURAL  LAND H»V£  BEEN  DEVELOPED  FOR RESIDENTIAL EXPANSION.

-------
C6AUG87



CITY
                   AS PPEDICTCO TO BETTER THAN PREDICTED
                        S50 FINANCIAL SUID'N ON P ^SIDEUTS. ?3TI MAT tO »=E = S OF *260/YR.
 FIUOI'IGS:      Ui^K FFIS TP i


 MORE FINDINGS: uirR Ft.s ft«v I



WCSTOH               W'STON,VILLAG? ^F                  WOOD                  OH  MAUHES  RIVER  BASIN  1979      178
 ISSUE:         S3CIO/LAMDUSF
 PRUOICTION:    TH- PK'CPOSrD 54NITA?Y SHWcRS WILL 3r  IN TH =  PUBLIC RIGHT-OF-WAY  AND  WILL ENTAIL NO LAND USE CHANGES
 FINDINGS:      TH: s=w:-3 L:M£S  a?e ALONG PUBLIC RIGHTS-OF-WAY  AND HAVE  ENTAILED NO  LAND USE  CHANGES.


 MORE FINDINGS: PREDICTION HAS ACCURATE.



HESTON               W^STON,VILLAGE OF                  WOOD                  OH  MAUIE=  RIVER  BASIN  1979      179
 ISSUE:         SOCIO/USrRCHG
 PREDICTION:    ESTIMATED MJNTNLY CHARGE OF  $io-it  PER MONTH FOR THE TYPICAL  RESIDENTIAL CUSTOMER.
 FINDINGS:      THE CURRENT SASC RATE USER FEC  is $12.35 PER MONTH.


 MORE  FINDINGS: THE PREDICTION WAS ACCURATE.



GOODHUF             -GOOOHOe,CITY OF                   •GOQDHWE               MN  UPPER  MISSISSIPPI   1982      &80

-------
06&UG8T
                   AS PREDICTED TO 3ETUR THAN PREDICTED
                        (BY <>IVi3 8ASIN)
                                                                              ST  RIVER  BASIN
CITY                 GPANTEE                            COUNTY
 ISSUE:         SOCIO/LANDU5"
 PREDICTION:     CONSTRUCTION 3F A LAGOON WILL COVER 12.9 ACRES OF LAND.
 FINDINGS:      LAGOON WAS NOT CONSTRUCTED,INSTEAD A RBC WAS INSTALLED.THE 12.9 ACRES HAS NOT USED.
                                                                                                     NEPA(YR)
 MORE FINDINGS: IN ST-P  2,THE  12.9  ACRE LAGOON WAS FOUND TO  8?  INAPPROPRIATE,SOILS  WERE  TOO  PERMEABLE  AND  IT  WOULD
                HAVE BEEN ON A FLOODPL AIN. INST E AO OF  A LAGOON,  A  RBC  WAS  CONSTRUCTED.
RUSHFORD
 ISSUE:
 PREDICTION:
 FINOINGS:
                                                        FILLMOR3
                                                                              MN  UPPER  MISSISSIPPI    1980
181
                    RUSHFORO.CITY OF
               SOCIO/LANDUS-
               NO ABNORMAL LAND USE CHANGES ARE EXPECTED
               3USHFCPD GROWTH MOSTLY ON SEWEB rXT^ISIONS SINCE 1932  IN NORTH t NORTHEAST.  SEVERAL  NEW  DRY  INDUSTRIES
               TOWN' OF RUSHFJSD (50 HOMES) CONNECTS SOON. NEW NURSING HOME  N. OF  CITY  t  50  NEW  HOMES  CALMOST  500
               NcW P£OPL;> ILL DEVELOPMENT HAS TAKEN PLACE WITHIN AREA ANTICIPATED  BY  CITY.  OLD PLANT NOT YET  REMOVED
MOPE FINDINGS: DEVELOPMENT AS ANTICIPATED. SLUDGE DISPOSAL AS ANTICIPATED.  FALLOW FARM BOUGHT BY  CITY USED  FOR NEW
                             T SIT£.
                                                        FILLMORE
                                                                             MN UPPER MISSISSIPPI   1980
                                                                                                              182
RUSHFQRT             RUSHFOFD.CITY OF
 ISSUE:         SOCIQ/UiEPCHG
 PStOKTION:    AVERAGE MONTHLY COST  PFR  RESIDENT CONNECTION  IS  ESTIMATED  TO  BE  t4.10  ASSUMING  ANNUAL COST $33,079
 FINDINGS:      r.^p.n-t>f s?w.:* us" CHARGES  SINCE COMPLETION  OF  NEW  PLANT  ARF  »4.52  PER  RESIDENCE  t  $o.SB/THOUSAND GAL.
 MORE  FINDINGS: USCR CHARGE SPPX AS ESTIMATED ».
                                                         . HOWEVER, NO  MENTION  OF  VOLUME  CHARGE  IN  ORIGINAL  PROPOSAL.
                     ALH« MUNICIPAL WASTSWATER TPMT PLT BUFFALO
                                                                             wi UPPER MISSISSIPPI   1983
ALMA
 ISSUE:
 PREDICTION:    THE PI;CJECT MIGHT RESULT IN INCREASED EMPLOYMENT ous  TO CITY  GROWTH  AND  INDUSTRIAL  EXPANSION.
 FINDINGS:      THERE 'iAS NOT ?c?N ANY INCREASE IN EMPLOYMENT.
183
      FINDINGS: NO UNP^OKTEO IMPACTS NOTED.
                HOWEVER,THFRE  is SOME  INCONSISTENCY  IN THAT  ELSEWHERE  INDUSTRIAL  GROWTH  WAS  SPECIFICALLY  NOT  PREDICTED
                NO INCPu»3=  IN IMPLOYME'IT HAS OCCURRED.
ALMA                  ALPS MUNICIPAL WASTEWATER TRMT PLT BUFFALO
 ISSUE:         SOCIO/LANCUi?
 PREDICTION:    TWO ADDITIONAL ACRES  WILL ef  REQUIRED FOR  THIS PROJECT.
 FINDINGS:      TWO ADDITIONAL ACRFS  OF LAND  WERE USED FOR THIS  PROJECT.
                                                                              WI  UPPER  MISSISSIPPI    1980
                                                                                                             184
 MORE FINDINGS: LAND USE PREDICTIONS  WERE  ACCURAT:.  LAND  USE  PATTERNS  IN  THE  SERVICE  AR;A WERE  NOT  AFFECTED.
ALMA                 ALMA MUNICIPAL  WASTEWATER  TRMT  PLT  BUFFALO
 ISSUE:         SOCIO/SECDEV
 PREDICTION:    INCREASED OLV^LOPMENT  WILL NOT  OCCUR.
 FINDINGS:      THERE HAS MCT ?iEN INCREASED  DEVELOPMENT.
                                                                             WI UPPER MISSISSIPPI   1980
                                                                                                              185
 MORE FINDINGS: INCREASED DiV.-LQPMENT DIO NOT OCCUR.

-------
C6AUG67
CITY
             AS PREDICTED TQ HETTER  THAN  PREDICTED
                   *z-.n LIMITED GROWTH  m  SERVICE  AREA.TWO ntw INOUSTRISS.BUT THEY OON«T DISCHARGE PROCESS  HZO.
S-.VL?AL nnuj's HAVE «ii=ii  ARLF.  TO  HOOK  IN  WHICH  COULDN'T BEFORE.
AN INDUSTSTAL  °ASK  HAJ dE£N  PLANNED  AND  ALLOWED FOR.
FINDINGS: PLAI(T
                                 HAS  NOT ResuLT^o IN ANY SIGNIFICANT LAND USE CHANGES OR INDUCED GROWTH.
PAUGOR
 ISSUE:
 PREDICTION;
 FINDINGS:
                                                   LACROSSF.
WI UPPER MISSISSIPPI
                                                                                               1979
         189
           , VILLAGE Oc
SCCIC/USEPCHG
IllCKEAStO POWJP F3P TRANSPORT  t  TREATMENT;  C JUSTRUC T TON COST; HIGHER SEWER RATES DIFFICULT FOR  FIX  INC
33 Nr.W SPW-X USCRS  SINCE  PLANT OPENED.  CURRENT  RATT  5/3" MSTER t23.69/QUARTER <450 CUSTOMERS).
1994 SHWAiT UTILITY OPERATING  COSTS  LiSS  THAN  BUDGET FOR 1981.
 MDKT FINDINGS:
          SEWCR USE CHAKGcS TRIPLED WHEN  ?IEW  PLANT  OPENED.  5/3 IN LINE WAS »27/QUARTER 1980. 1985 DOWN  TO  $23.69
          NZW PLANT HUP; tXPFNSIVr TT  RUN THAN  OLD  PLANT,  AS  EXPECTED. ST'ONG IMPACT BECAUSE HIGH T  RETIRED  POP.
          GEHIR*L LONGTfRi: DEBT  PAYABLC  INCREASED,  BUT  «936,C'CO  NEW ASSESSED VALUE DUE TO WWTP HELPS  PAY IT
BRUCE                bPUCil,VILLAGE  OF                    RUSK
 ISSUE:         SOCIO/LANOUSE
 PRfOICTIQN:    TH = f.= WILL BE  NO LAND  USE  IMPACTS/CHANGES.
 FINDINGS:      PLANT IS ON EXISTING TREATMENT  PLANT  SITE OWHED BY BRUCE.
                                                                        WI UPPER MISSISSIPPI
                       1980
         190
 MORE FINDINGS: PREDICTION was ACCURATE.
BRUCE                EPUCI,VILLAGE  OF
 ISSUES         SOCIO/USEPCHG
. PREDICTION:   . USCR &HARGF.-TC FAMGE FPQ>*
                                                   RUSK
                                                                        WI UPP5R MISSISSIPPI
                        1983
                                                                                                         191
                                           TO  $9.87'

-------
C6AUG87            AS PREDICTED  TO  BETTER  THAN  PREDICTED
                         (EY  R1VC-P  BASIN)
CITY                 GPAN7EE                             COUNTY               ST RIVER BASIN         NEPA(YR)
 FINDINGS:       ACTUAL  1984  OtM  COSTS  WERE  $19,529.  ACTUAL  USER CHARGE IS *5/MONTH PLUS 41.35/1000 GAL.

 HOF
-------
06AUG87
                  AS PREDICTED TO BETTER THAN PREDICTED
                       CBY RIVER BASIN)
CITY
DE SOTO
 ISSUE:
 PREDICTION:
 FINDING'S:
                     G RANT EL-
                                                       COUNTY
                     ST RIVER BASIN
                                                                                     NEPA(YR)
                                                       VERNON/CRAWFORD
                     WI UPPER MISSISSIPPI   197B
                                                                                              197
                     DESOTO,VILLAGE OF
                SCCIO/USERCHG
                THE PAY SCHEDULE HAS B?EN DETERMINED TO BE $10.50/MQNTH/MOUSEHOLD.
                CURRENT MONTHLY SEWER USE RATES (SINCE 1980) ARE «13.50/RESIDENCE. *22/BUSINESS,  $13/CHURCH,  »5/MOTEL,
                I56C/SCHOOL. USER BASE IN 1985 IS 126 RtSIDENCES. 19 BUSINESSES,3 CHURCHES, 10  MOTELS. 1 HIGH SCHOOL.
 MOPE FINDINGS: ACTUAL RESIDENTIAL USER CHARGES 198:-1985 ARE *3.oo PER MONTH HIGHER  THAN  PREDICTED  <29t  HIGHER)
                HOUSEHOLD INCOME IN DE SOTO HAS RIS£N LeSS THAN 29t SINCE 1978 UHEN FNSI WAS  WRITTEN.
                                                        9UFFALQ
                                                                            WI UPPER MISSISSIPPI
                                             1979
                                                                                              198
FOUNTAIN CTTY        FOUNTAIN CITY,CITY OF
 ISSU::          SOCIO/EMPLOY
 PREDICTION:     CORPS OF ENGINEERS EMPLOYMENT INCL. DREDGE MAINTENANCE YARD WILL NOT BE AFFECTED BY THE  PROJECT.
 FINDINGS:       MANUFACTURING t DETAIL EMPLOYMENT IN BUFFALO COUNTY IS VERY SMALL.AGRICULTURAL EMPLOYMENT  IS  LARGE.
                rMPLOVMtNT HAS HOT CHANiED.
 MOR? FINDINGS: EMPLOYMENT HA> no' CHANGED.
                                                        BUFFALO
                                                                            WI UPPtR MISSISSIPPI
                                            1979
                                                                                              199
FOUNTAIN CITY        FOUNTAIN CITY,CITY OF
 ISSUE:         SOCIO/LANOUSE
 PREDICTION:     TH- PROVISION OF ADDITIONAL SEWAGE COLLECTION WILL HAVE NO MAJOR EFFECT ON RESID.COMM.OR  INO.  GROWTH.
 FIHOINGS:     •  CiTY ST;LL HIIULY Rtsro^NTiAL.Nj LAND USF CHANGES.NO SIGNIFICANT GROWTH IN THE AREA.
MORE FINDINGS: LAUD
                       s: PATTERNS HAVE NOT CHAMGFD.NO GROWTH IN THE AREA.
PHILLIPS
 ISSUE:
 PREDICTION:
 FINDINGS:
                                                       PRICE
                     WI UPPER MISSISSIPPI
     PHILLIPS,CITY QP
SCCIP/UiERCHG
MONTHLY USER CHARGE F3R DEBT AND OEM WILL 5E «12.65 /MO.
OtM CHARGES F0° 198* WERE »5.56/MO. DEBT SERVICE IS NOT PART OF USE* CHARGE.
                                                                                                     1983
200
 MORE FINDINGS: otw CHARGE ACCURATELY PREDICTED
PLUM CITY
 ISSUE:
 PREDICTION:
 FINDINGS:
                    PLUM CITY,VILLAGE
               SOCIO/rMPLOY
PISRCE
                                                             WI UPPER MISSISSIPPI    1979
                                                                                                              201
 MORE FINDINGS: NO IMPACT ON IMPLOYMENT Has RESULTED.
PLUM CITY
 ISSUE:
 PREDICTIONS
 FINDINGS:
                    PLUM CITY,VILLAGE OF
               SCCIO/LANOUSE
PIERCE
                                                             WI UPPER MISSISSIPPI    1979
                                                                                                              202

-------
                    AS  pPEDic'io TC »ETT-:R THAN  P^EDICT^C
                         C>Y  RIVCP PASIN)


CITY            .      GFANTFl.                             COUNTY

      FINCZNGS: LAV:  USf. PCTTrRNS IN THf  S'RVIC:  AREA  WERE NOT AFFECTED.
                                                                                ST  RIVER  BASIN
                                                                                                       HEPACYR)
PLUM CT.TV
 issu;::
                                                          PI'RCc               WI UPPER  MISSISSIPPI   1979
                SCCIO/PDP
          'i:
 FItiOlNGS:


 MOR: Fir.Discs: MINIMAL  IMPACT TO POPULATION HAS  RFSULTCO FROM THE PLANT EXPANSION.
                      PLUM CITY.VILLAGE OF
                 SCCIO/PDP

                 ACCCPCTNG TC VILLAGE PRESIDENT.  1935  POPULATION is s"9, UP  FORM  485  IN  1978.
                 V-.iR  ;rCJ PCpULiTl3N PPOJECTF.C  A3  8?9.
                                                                                                                 203
PLUM CITY
 ISSUt:
 PFEP:CT:"?N:
                                                          PIERCE
                                                                               WI UPPzR  MISSISSIPPI   1979
                      PLUM C;TY,VILLAGE 3e
                 SOC:C/;ECOFV
                 C.'MMU!.:TY Gl CWTH WILL 8:. PCSSIOLr  THROUGH ENLARGED WWTP CAPACITY.
                 tun  AP'f-yiljT r.QMPLZ-XHS TCTALING 13  UNITS HAV5 BESh «UILT  SINCE  THE  PROJECT.
                                                                                                                 204
 MCRF riNDINCS:  AS  A  CliULT ?F TM.; PCOJ£CT,TME MORATORIUM ON SEWEP tXTFNSIOHS  WAS  LI FTEO.ALLOWING RESIDENTIAL  GROWTH
SHELL LAKT            *-.LL  L4K"(CTTY Cc
 ISSUE:         !ocir/',-;c?cv
 PPF.DICTION:    no piPT:cuLi?  icctLr?ATicn
 Firitir.'Cs:      Av/kAi. :  WA$TCWUC° FL:H is
                                                          WASH?URN
                                                                               WI  UPP£R  MISSISSIPPI   1983
                                                  ''Go.
205
    "  FINDINGS:
                                                          NO S:GM:CICANT INCREASE  IN  OEVELOPMENT.
                                                          wASHDURf4
                                                                               HI  UPPER  MISSISSIPPI   1980
                                                                                                                206
SHELL LAK:            'H::LL  uiK.^.ciTY ?•=
 ISSUf:         iJCIO/L'SERCHG
 pptoiCTion:    FUTURE,  us:? CHARGES WILL BF 17  TO  IS/MONTH PER HOUS;HCLO: USER CHARGES  WILL INCREASE ou: TO PROJECT
 F:I.O;NI,S:      ^TJ^ATtO  us^ CHAC.JFS A^L  in. 32 PTR  MO f>i?.
                1934  !!  t  (I  C?:T FIJ11 NSW PLRIIT 15 »22,•!  I'J TH1: R'ST OF THE PLANNING  A^iA  WAS MOT AFFECTED.
                           ,VILLiGr
                                                                                WI  UPP£R  MISSISSIPPI   1980
                                                                                                                208

-------
060UGS7
CITY
 ISSUE:
 PREDICTION:
 FINDINGS:
   AS PhEDICTrO TO SETTER THAN PREDICTED
        (BY RIVER B4SIN)
                                                              ST  RIVER  BASIN
                                                                     NEPACTR)
     li?IANTE£                            COUNTY
S3CIO/SECDEV
N3 DEVELOPMENT WILL RESULT FROM EXPANSION OF  THE  FACILITY.  NORMAL  GROWTH MILL  BE ACCOMOOATEO
TWO RESIDENCES HAVE SEEN CONSTRUCTED AS A RESULT  OF  THE  SEWER  LINE EXTENSION.
 MORC FINDINGS:  ALTHOUGH NO  DEVELOPMENT  was  ENCOURAGED,  NORMAL CITY GROWTH WAS ACCOMODATED
W5STBY
 ISSUE:
 PREDICTION:
 FINDINGS:
                                        VERNON
                                             WI UPPER  MISSISSIPPI
                                                                                     1979
                                                                                              209
     WESTBV SrWAGE TREATMENT PLANT
SOCIO/LANDUSE
AVAILABILITY QF ADEQUATE TREATMENT NOT EXPECTED TO SIGNIF CHANGE  PATE,OENSITYiOR  TYPE  OF  DEVELOPMENT
NO NEW DEVELOPMENT SINCE PLANT STARTUP,6? UNITS BUILT JUST  BEFORE  ARE  IN  LINE  WITH  LAND USE  PLAN.
 MORE FINDINGS: CITY  ADOPTED  LAND  USE  PLAN  AND  ZONING  JUST  BEFORE  FACILITY PLAN WAS WRITTEN.60 NEW HOUSING UNITS WERE
                TUlLT  -Ic'fOR'':  PLANT  OPENSOsLCCATEO  ACCORDING TO PLAN.NO NEW INDOOR COMMERCIAL OEV.CITY NOT ABLE TO
                EXTEND  SEWERS  TO ALL  INTENDED AREAS  IN TOWN DUE TO ENGINEERING PROBLEMS,SO SEPTIC SYSTEMS STILL USED.
ST. LOUIS
 ISSUE:
 PREDICTION:
 FINDINGS:
     ST. LOUIS,
SCCIO/LANDUS^
CITY Oc
                                        GRATIOT
                                                             MI  SAGINAW  RIVER  BASIN  1976
210
NO MAJOR CHANGE IN LAND USE HAVE OCCURRED.
 MORE FINDINGS:
BURTON
 ISSUE:
 PRtDICTION:
 FINDINGS:
                                                             MI  SAGINAW  RIVER  BASIN  1978
                                                                              211
            1 COUNTY (OAVISON SEGMENT)  GENESSEE
SOCIO/LANDU5E
SOME INCREASE DEVELOPMENT WITHIN SERVICE AREA  IN LIEU  OF  SCATTERED  DEVELOPMENT  IN OUTLYING AREAS.
SLIGHT INCREASE IN COMMERCIAL DEVELOPMENT. INSIiiMIFICANT  GROWTH  IN  RESIUENTAIL  SECTOR.
 MORE FIflDINGS: SLIGHT DEVeLOPMFNT  IN COMMERCIAL  SfCTOR.  INSIGNIFICANT GROWTH IN RESIDENTIAL SECTOR.
BURTON
ISSUE:
PREDICTION:
FINDINGS:
GENE3SEF COUNTY COAVISON SEGMENT) GENESSEE
SOCIO/USERCHG
EXISTING INDEBTEDNESS WOULD INCREASE
r.XISTING INDEBTEDNESS DID NOT INCREASE.
MI SAGINAW RIVER BASIN 1978
                                                                                                              212
 MORE FINDINGS: EXISTING INDEBTEDNESS  DID NOT  INCREASE.  TAP-IN FEES  WERE THE PRIMARY FUNDING FOR NEW CONSTRUCTION SI
                NC!: GfcA»iT MONIES WESE  NOT RECEIVED  IN  TIMi  TO  DO TH£ WORK.  USE FEcS INCREASED BY $1.00/CUSTQMER/MTM
CASS
 ISSUES
 PREDICTION:
 FINDINGS:
                                        TUSCOLA
                                             MI  SAGINAW RIVER  BASIN  1977
     SAGINAU COUNTY WTP
SOCIO/LANOUJP
N=W SEWER CONSTRUCTION IN SUBSTANTIALLY DEVELOPMENT  AREAS  SHOULD  NOT  CHANGE  LAND USE
THr: PLANT EXPANSION HAS NOT RESULTED IN LAND USE CHANGES.
                                                                                              213
 MORE FINDINGS:

-------
C:TV
                    AS  PfFOTCT£0 TC P,":TTiR THAN PREDICTED
                         (?r  BlVb'R BASIN)
                                                         COUNTY
                                                              ST RIVER  BASIN
                                                                                      NEPA(YR)
DURAHD
 ISSUE:
 PREDICTION:
                 NO  CHANGES  IN LAN? USE DUi TO PFOJECT.
                 NC  LAUD USF  CHAMGL.
                                                         SH:AWASSEE
                                                              HI SAGINAU  RIVER  BASIN  1976     21*
 MOP.F FINDINGS:
GLADWIH
 ISSUC:
 PREDICTION:
 FINDINGS:
                     GLADWII..CITY  OF
                SCCIO/SECC-V
                NC inoucED GP:WTH  OR  POPULATION  SHIFTS
                HO AOVrRSE IMP4CTS  OCCURRED
                                         GLADUIN
                                                                        HI  SAGINAU  RIVER  BASIN 1976     215
    *. FINDINGS:
HOLLY
 ISSUE:
 FINDINGS:
     CAKLANU COUNTY OPU
                                                         OAKLAND
                TH'Rc WILL (>= NO  aPPPECIAflLfc  EHPLDVHENT  CHANGE.
                TWO ntw FLILLTZML  ;MPLQYS^S  WER?  HIPED  AT THE PLANT.
                                                                        HI SAGINAU RIVER  BASIN  1977
216
      FINDINGS :
HCLLY
 ISGUf:
 PREDICTION:
                                                         OAKLAHO
                                                                              HI SAGINAM RIVER BASIN  1977
                                                                                               217
               DAKLANC' COU''TV "PW
          SCCIO/LAHCDiE
          THCRE WILL f.T NO APPRECIABLE  LAUD  USE  CHANGE.
          $CMc ADDITIONAL G30wTH NOu  IN  AREAS WH^RE GROWTH WAS CURTAILED BY LIHITATIONS
          TH CH31TF StSTrftS.  NO CTHCF  GROWTH HAS  TAKEN PLACT.

FINDINGS: SOME RESIDFNTHL HOOK-UP  TO  SFHEP  SVST=H HAS TAKEN PLACE WHERE EXISTING  HOUSES  ARE  ADJACENT TO NEW s
          EWER LINES.  HCWEViP,  NO  INDUCED COMMUNITY GROWTH HAj TAKEN PLACE.
HOLLY
 ISSUE:
 PREDICTION:
 FINQICGS:
                     OAKLAND COUNTY  OPW                  OAKLAND
                SCCIO/POP
                VILLSi,H POPUL/lTIiDN WILL  GROW.
                TH3 PR'ScliT VILLAGE  POPULATION IS APPRCKIH4TELY 575Jt INDICATING
                GROWTH AT  4 PATt  SIMILAC  TO  THE  HISTORICAL RATE.
                                                              HI SAGINAW RIVER  BASIN  1977
                                                                                                         218
 MORE FINDINGS:
MOWELL
 ISSUE:
 PREDICTION:
                                                         LIVINGSTON
     HOWELL.CITY OF
SOCIO/LAMOJSE
        GROWTH JND US= OF  INDUSTRIAL  ZONED LA'IDS FOR SLUDGE HANDLING.
                                                                        HI SAGINAW RIVER  BASIN 1976
                                                                                                               219

-------
C6AU087
AS P'-CDICTED TO 3ETTiR THAN PPEDICT'rO
     ChY PIVcR BASIN)
CITY                 GPANTft                            COUNTY                ST  RIVER  3ASIN          NEPA(YR)
 FINDINGS:      INDUCED GROWTH AS PREDICTED. US- OF  INDUSTRIAL  ZONED  LAND  FOR  SLUDGE HANDLING.



 MDR5 FIHOINGS: RESIDENTIAL ANO  INDUSTRIAL GROWTH HAS OCCURRED.  PLANT  EXPANSION  PERMITTED.  PEPSI-COLA AND INTERNATIO
                NAL PAPtR TO INCREASE  THEIR W&STEWATER CONTRIBUTIONS  BY  30-40?.  ALLOWED OGIHARA  IRON WORKS TO OEVELO
LAPEHF               LAPEER.CITV OF                     LAPcER                HI  SAGINAW  RIVER  BASIN  1976      220
 ISSUE:         SCCIO/EMPLOV
 PREDICTION:    TII~ WWTP WILL CREATE  7 PERMANENT JOBS.
 FINDINGS:      PIVE P^PM-M^NT JOBS WERE CREATED.


 MCF= FlhPtNGS:



LAPtER               L«P5i-e,CITY Oe                     LAPEER                HI  SAGINAW  RIVER  BASIN  1976      221
 ISSUE:         SOCIO/LANOUS!:
 PREDICTION:    INOUC;P POPULATION GROWTH
 FINDINGS:      POPULATION GPOWTH  OCCUPRtO


 HOPS FINDINGS: suRSTanTiiL  itiousTRiaL GPQWTH  is ANTICIPATED  IN  THT  FUTURE  CUE  TO  ANNEXATION.  CITY  is  PLANNING TO AN
               ; NHX PORTION  OP AL9« CO. WHICH  IS. ALREADY  3EWEREO.


TITTAB4WdSS = F. TrfP    TI TTi? A WA SSE" TWP WWTP             SAGINAW               MI  SAGINAW  RIVER  BASIN  1979      222
 ISSUt:         SOCIO/LAMOIJ3?
 PPEOICTION:  '  PLANT  FIXPANSUN WILL  NOT CURTAIL LAKO us?.
 FINDINGS:      TH  PLAIIT EXPANJICN DID NJT CURTAIL LANO  USE.


 MORE FINDINGS:



TITTAPAWASSEE TWP    T TTT A? AWi SS'I; TWP WWTP             SAGINAW               MI  SAGINAW  RIVER  BASIN  1979      223
 ISSUE:         SOCIO/Pf OPVAL
 PREDICTION:    to CHANGE in PROPERTY VALUE FROM THS PROJECT.
 FINDINGS:      THF PROPERTY vatui OF ADJACENT AGRICULTURAL AND  INDUSTRIAL  ZONED LANDS
                WcRE HOT IMPSCTED  BY  THn PROJECT EXPANSION.

 MORE FINDINGS:



TITTAEAWASSEE TWP    TZTTABAWASSEE TWP WWTP             SAGINAW               MI  SAGINAW  RIVER  BASIN  1979      22*
 ISSUE:         SOCIO/SCCOPV
 PREDICTION:    no DISPLACEMENT, INCREASED RESIDENTIAL t  COMMERCIAL  DEVELOPMENT  SHOULD OCCUR.
 FINDINGS:      NONE WAS FOUND.
 MORE FINDINGS:

-------
C6AUG87            AS PFEDICTrO TO BETTER THAN PREDICTED
                        C5Y RIV:« BASIN)

CITY                 GrANTEC                            COUNTY               ST RIVER BASIN         NEPA
-------
 06AUG87
AS PF.EDICTtO TO 3ETTER THAN PREDICTED
     (?Y PIVEP BASIN)
 CITY                 C?ANTE;                             COUNTY                ST  RIVER BASIN

  MOPE FINDINGS:  FLAPGATES  INSTALLED AT OVERFLOWS  TO CORRECT ELEVATION RELATED OVERFLOW PROBLEMS.
                                                                                 NEPACTR)
 NAPOLCPN             N4POLeCN                           HENRY    .             OH MAUMEE RIVER  BASIN  1977      231
  ISSUE:          AGPICULTUR5
  PREDICTION:
  FINDINGS:


  MORE FINDINGS:  NO IMPACTS HER"- PREDICTED OR DTSCCVEI-FD REGARDING AGRICULTURAL LAND USAGE.



 PIOGEVILLE  CORNERS   HENRY CSUNTYCRIOGEVILLE CORNERS)    HENRY                 OH MAUMEE RIVER  BASIN  1976      232
  ISSUE:          AGRICULTURE
  PREDICTION:     16 ACR=S OF  AGRICULTURAL LAND COMMITTED FOR USE AT STP.
  FINDINGS:       iz ACKF:; USED FOP TRCATM^NT PLAMT SIT£.


  MORE PIUDINGS:



 TOLEDO               TOLEOO-W&LBRIOGE           '        WOOD                 OH lAUSEE RIVER  BASIN  1980      233
  ISSUE:          A'iRliCULTUR1
  PREDICTION:     THE PROPOS?O PROJECT SHOULD NOT OIPECTLY TAKE  ANY LAND OUT  OF AGRICULTURAL  PRODUCTION
  FINDINGS:       NO COMMERCIAL OR RESIDENTIAL DEVELOPMENT ON AGBKULTURAL LAND TO DATE.


  MORE FINDINGS:  NO IMPACTS TO AGRICULTURAL LAUDS HAVE  OCCURRED.



 TOLEDO               TOLEDO,CITY 3*= (Tr.M MILE CRrEK)    LUCAS                 OH MAUMEE RIVER  BASIN  1977      23*
  ISSUH:          AG=>ICULTKR =
  PRfDICTION:
  FlhDINGS:


  MORE FINDINGS:  NO AGPICULTURAL IM°ACTS WERE PREDICTED OR DISCOVERED


 • •••——••—•—»»—"•—"•—••"» — —»«•——"—"»«""•"»• ^••^^^••••••^ V ««••_•»<•«•• ^^••^^••••^ ^••^••^••^^IB flB^^^aB M <«>«B<»a>V>^^^^^^^^^^^
-------
C6AU08T
   AS PREDICTED TO SETTER THAN PREDICTED
        (BY RIVER BASIN)
                                                                              ST  RIVER  BASIN
                                                                                    NEPA(VR)
CITY                 GRANTEE                            COUNTT
 ISSUE:         AGRICULTURE
 PREDICTION:
 FINDINGS:      NO APPARENT IMPACT ON AGRICULTURE. SECONDARY IMPACT POSSIBLE IN FUTURE FROM NEW DEVELOPMENT ON PASTURE
                OR CROPLAND
 MORE FINDINGS: NO  APPARENT  IMPACT  ON  AGRICULTURE
                     AUGUSTA,CITY  OF
                AGRICULTURE
                                            CLAIRE
                                                                             MI UPPER MISSISSIPPI   1977
                                                                                                              237
AUGUSTA
 ISSUE:
 PREDICTION:
 FINDINGS:      NO ADDITIONAL LAND WAS ACQUIRED FOF TH': PL ANT. LANDUSE HAS NOT CHANGED SIGNIFICANTLY.
                HIGH NITROGEN AND PHOSPHORUS CONTENT OF SLUDGE HAS BEEN OF 3ENEFIT TO LOCAL FARMERS AS FERTILIZER.

 MORE FINDINGS: AGRIC. ISSUES WERE NOT ADDRESSED.AGRlC LANDS HAVE MOT BEEN LOST C BENEFITS FROM SLUDGE ARE POSITIVE.
6ANGOR
 ISSUE:
 PREDICTION:
 FINDINGS:
                                        LACROSSE
                                                                             WI UPPER MISSISSIPPI
                                                                                                     1978
                                                                                             238
                     6ANGOR,VILLAGE OF
                AGRICULTURE
                REMOVAL OF AGRICULTURAL LAND FOR PERMANENT USE AS A WASTEWATER TREATMENT SITE CANNOT BE AVOIDED
                UfcW PLANT BUILT ON OLD GRADED SITE. SOME EXPANSION NECESSARY BUT NOT INTO AGRICULTURAL LAND.
                FARMER TAKES ALL SLUDGE PRODUCED IN WET FORM c USUALLY INCORPORATES IMMEDIATELY.
 MORE FINDINGS: NO FARMLAND HAD TO BE ELIMINATEO-:AT ALL BECAUSE OF USE OF  PREVIOUS  PLANT  SITE
BARRON
 ISSUE:
 PREDICTION:
 FINDINGS:
                                        BARRON
                     PAKRQN.CITY OF
                AGRICULTURE
                LOSS CF SOME AGRICULTURE LAND
                TURKFY FARM STILL IN OPERATION, LOSS OF LAND APPEARS NOT LARGE.
                                                                             WI UPPER MISSISSIPPI
                                                                                    1980
239
 MORE FINDINGS: PREDICTION OF SOME LOSS is CORPICT
BIRCHWQOD
 ISSUE:
 PREDICTION:
 FINDINGS:
                                        WASHBURN
                     BIRCHWOOD,VILLAGE OF
                AGRICULTURE
                NO IMPACT Oil AGRICULTURE
                FARMER USES ADJACENT LAND FOR CATTLE GRAZING.
                MUCH OPEN LAND IN AREA.
 WORE FINDINGS: NOT AN  ISSUE,  ACCORDING TO LPCAL VIEW.
                                                             WI UPPcR MISSISSIPPI
                                                                                                    19B2
240
BRUCE
 ISSUE:
 PREDICTION:
 FINDINGS:
     BRUCE,VILLAGE OF
AGRICULTURE


NEW FACILITY 3UILT ON EXISTING SITE.
                                                         RUSK
                                                                             WI UPPER MISSISSIPPI   1980
                                                                                                             2*1
 MORE FINDINGS: NO AGRICULTURAL LAND WAS USED AS TREATMENT FACILITY WAS BUILT ON  EXISTING  SITE  DEDICATED  TO  WASTEWATER

-------
06AUG87
CITY
   AS PREDICTED TO BETTER THAN PREDICTED
        (OT RIVE" 3ASIN)


     GPANTEC                            COUNTY
TREATMENT
                                                                             ST RIVER BASIN
                                                                                                    NEPACYR)
BUTTFRNUT
 ISSUE:
 PREDICTION:
 FINDINGS:
                                        ASHLAND
     BUTTERNUT,VILLAGE OF
AGRICULTURE
SOME MINOR CROP LOSS, DUE TO LOSS OF 25 ACRES FOR SEEPAGE PONDS
ABOUT 25 ACRES REMOVED AS PREDICTED.
                                                                             UI UPPER MISSISSIPPI   1981
         242
 MORE FINDINGS: AREA is NOT LARGE. THERE ARE OTHER LOCAL OPEN AREAS. IMPACT is MINIMAL
CORNELL
 ISSUE:
 PREDICTION:
 FINDINGS:
                                        CHIPPEWA
                                                                             UI UPPER MISSISSIPPI
1980
243
     CORNELL,CITY OF
AGRICULTURE
ASSOCIATED LOSS OF FARM LAND ASSOCIATED WITH INCREASED GROWTH
THERE HAS B£Etl NO LOSS OF AGRICULTURAL LAND OUE TO TH£ PLANT EXPANSION SINCE NO GROWTH HAS OCCUREO.
AGRICULTURAL LANDS HAVE BENEFITED FROM THE LAND APPLICATION PROGRAM,  PARTICULARLY INCREASED ALFALFA.
 MORE FINDINGS: AGRICULTURAL LANDS WERE NOT LOST AND BENEFITS HAVE RESULTED FROM SLUDGE APPLICATIONS.
CUMBERLAND     '      CUMBERLAND,CITY OF                 BARRON
 ISSUE:        • AGRICULTURE
 PREDICTION:   ' INITIALLY ABOUT 2.3 ACRts WILL ss. PEMOVEO FROM AORTC. USES
 FINDINGS:      NEW PL&MT OCCUPIES THE 2.3AC SITF Ai P«?tOICTED.
                                                                             WI UPPER MISSISSIPPI   1978
                                                                                             244
 MORE FINDINGS: PLANT OCCUPIES PREDICTED STTC
                                                        VcRMON/CRAWFORO
                                                             WI UPPER MISSISSIPPI   1978
                                                                                                             245
DE SOTO              DESOTO,VILLAGE OF
 ISSUE:         AGRICULTURE
 PREDICTION:    IT MAY BECOME NECESSARY TO FIND A SLUDGE DISPOSAL SITE .... EITHER AGRICULTURAL LAND OR PUBLIC LANDFILL
 FINDINGS:      ALL SLUDGE IS SPREAD ON 1 ACRE PER YEAR, ON 1 FARM WITH 40 ACRE APPROVED SLUDGE SITE.
 MORE FINDINGS: SLUDGE LANDFILLEO UNTIL 1933 WH^N DE SOTO SLUDGE SITE WAS APPROVED (VILLAGE LANDFILL WAS CLOSED)
                ALL SLUDGE GOcS TO 1 FARMER WITH 40 AC'S APPROVED SLUDGE SITE 9UT SPREAD ON ONLY 1 ACRE PER YEAR,
FOUNTAIN CITY        FOUNTAIN CITY.CITY OF              BUFFALO
 ISSUE:         AGRICULTURE
 PREDICTION:    AGRICULTURAL USE OF THE RIDGES WILL CONTINUE.
 FINDINGS:      NO CHANGES IN AGRICULTURAL USE.
                                                             WI UPPER MISSISSIPPI    1979
                                                                                                             246
 MORE FINDINGS: NO CHANGES IN AGRICULTURAL USE.
PHILLIPS             PHILLIPS,CITY OF                   PRICE
 ISSUE:         AGRICULTURE
 PREDICTION:    NO AGRICULTURAL LAND WILL BE LOST AS A RESULT OF PROJECT
                                                             WI UPP5R MISSISSIPPI
                                                                                                    £980
                                                                                                             247

-------
C6AUG87            AS PREDICTED TO BETTER THAN PREDICTED
                        
-------
06AUG97
AS PREDICTED TO BETTER Trt«N PREDICTED
         RIVER BASIN)
CITY
  GRANTEE.
                                                        COUNTY
                                                                              ST  RIVER  BASIN
                                                                                                    NEPA(VR)
FORT WAYNE
 ISSUE:
 PREDICTION:
 FlhOINGS:
                                                        ALLEN
                     FORT WAYh=,CITY OF (S^
                PMYS f'JV/SOILS
                SOIL EROSION RESULTING FROM THE CONSTRUCTION CANNOT BE AVOIDED.
                NO LCNG-T5PM EROSION PROBLEMS AROSE DUE TO CONSTRUCTION.
                                                                              IN MAUMcE  RIVER  BASIN   1980
                                                                                           253
 POP.F. FINDINGS: EROSION WAS HOT A PROBLEM AFTER C ONSTRUCTI ON. QUICK  BACKFILLING  MAS  DONE  AFTER  CONSTRUCTION.
FORT WAYNF           FORT WAYN:,CITY OF (SEWEPS)        ALLEN
 ISSUE:         PHYS ENV/TQPQ
 PREDICTION:
 FINDINGS:      TOPOGRAPHY SAME AS PRIOR TO CONSTRUCTION.
                                                                              IN  MAUMEE  RIVER  BASIN   1980
                                                                                           25*
 MORE FINDINGS: TQPOGPAPHY HOT AFFFCTED BY CONSTRUCTION.
                                                        ALLEM
                                                          IN KAUSEE  RIVER  BASIN   1980
HONPOEVJLLE          HONROr-VILLc.SwG DISPOSAL AUTM
 ISSUE:         PHYS fNV
 PPFOICTION: •   WASTE STASILHATICN LAGOON CONSTRUCTED ON A 13 ACRE SITS ADJACENT TO EXISTING PLANT  SITE
 FINDINGS:   '   LAGCCN :s 12 ACR=S /3 STAGE LAGOON ON ACDUT A 6 FOOT RISE APOVS THE PLANT.
                                                                                                              255
 MORE FINDINGS? LAGOOH CONSTPUCTFD AS DESIGNED.
MONROEVILLF
 ISSUE:
 PPEDICTION:
 FINDINGS:
                     HOHROEVILLE.SWG OISP3SAL AuTH      ALLEH
                PHVS cNV/SCILi
                =RCSIPN CONTROL M£ASU?ES MILL PE TAKEN
                NO NOTICEABLE ^ROjICN IS OCCURRING AROUND THE CONSTRUCTION SITE.
                                                          IN MAUMEE  RIVER BASIN   1993
                                                                                                              256
                EROSION P30PLE1S UUPIMG CONSTRUCTION MER' MINIMIZED  THROUGH  PROMPT  CONSTRUCTION OF ZONED AREAS

 MORE FINDINGS: NO EROSION PPOBL=MS HAVE CCCUPPEO BECAUSE OF CONSTRUCTION.  SITE  WAS EXAMINED  FOR PROBLEMS
ADA
 ISSUE:
 PREDICTION:
 FINDINGS:
                                                        HAPDIN
                     AOA 3EUAC-? TREATMENT PL»tlT
                AI? QUALITY
                OUST MOIS1; ANO TRAFFIC CONOgSTION WILL OCCUR DURING CONSTRUCTION
                NO EVIDENC? OF PREDICTED I*PACTS-NOISc/3UST/TRAFF1C CONGESTION.
                SH?RT-TERM DUST IMPACTS wsoc SIGNIFICANT DURING
                CONSTRUCTION.
    z FINDINGS:  SHIRT URM OUST NOIS? AND TRAFFIC IMPACTS ALSO OCCURRED.
                                                          OH MAUMEE RIVER BASIN   1976
                                                                                                              257
ADA                  ADA SPWAG? TREATMENT PLANT         HARDIN
 ISSUE:         PHYS EHV/TOPO
 PREDICTION:
 FINDINGS:      DIPT AND CLAY HILL CREATED WITH EXCAVATED SOIL FROM
                INSTALLATION OF .LINES.  THE HILL, ABOUT 50-60 FT
                                                                             OH  MAUMEE  RIVcR  BASIN   1976
                                                                                           258

-------
C6AUG87
AS PR?DTCT=0 TO 3ETTER THAN PREDICTED
     (BY PIVtR BASIN)
CITY                 GRANTEE                            COUNTY
                HIGH,  IS USIO FOP WINTER SLEDDING.
 MORE  FINDINGS: NO PFEOICTTON WAS MADE CONCERNING CREATION  of DIRT  HILL
                                                          ST RIVER BASIN
NEPA(TR)
CRICFPSVILLE         CRIDcRSVILLE,VILLAGE OF            AUGLIAIZE            OH  MAUMEE  RIVER  BASIN   1977      259
 ISSUE:         PHYS tNV
 PREDICTION:    .ADVERSE IMPACTS DURING CONSTRUCTION,  SHORT  TERM, WILL  BE MITIGATED
 FINDINGS:      HO,REMAINING IMPACTS  EVIDENT.


 MOPE FINDINGS: NO REMAINING ADVERSE  IMPACTS



HARROC               HAROOD,VILLAGE OF                  ALLEN                OH  MAUMEE  RIVER  BASIN   1977      260
 ISSUE:         PHYS ENV
 PREDICTION:    PROJECT WILL NOT IMPAIR LANDSCAPE.
 FINDINGS:      NO ADVERSE IMPACTS HAVE OCCURRED.


 MORE FINDINGS: NO AOVEP.SE IMPACTS HAVE OCCURRED.



KALIOA               KALI04,VILLAGE OF           '.:       PUTNAM               OH  MAUMEE  RIVER  BASIN   1976      261
 I.SSUE:         PHYS cNV
 PREDICTION:    DISRUPTION uc LAND DURING CONSTRUCTION AND  RUN OFF DUE TO CLACK  OFJ VEGETATION.
 FINDINGS:      NO LONG-T^PM AVERSE  OTSRUPTIONS OCCURRED DU= TO CONSTRUCTION.
                e^SEEDinG.

 MOR2 FINDINGS: NO UNANTICIPATED PPOBLcMS OCCURRED DUE TO CONSTRUCTION OF SEWERS AND PLANT.



MONTPILI'P           MONTpeLIZl? SWG TQT PLT             WILLIAMS             OH  MAUMEE  RIVER  BASIN   1980      262
 ISSUE:         PHYS cNV
 PREDICTION:    IMPACTS OP $?W?R CONSTRUCTION HILL 3? NOISE, DUST, SOIL EROSiQN.t TRAFFIC DISRUPTION DURING  CONSTRUCT.
 FINDINGS:      THvRS WE1?: NO CONSTRUCTION PROBLEMS  INDICATED. PRESUMABLY MITIGATIVE MEASURES WERE  EMPLOYED.


 MORE FINDINGS: FLAPGATES INSTALLED AT OVERFLOWS TO  CORRECT ELEVATION  RELATED  OVERFLOW  PROBLEMS.
                NO EROSION P'0«LpMS NOW N33 DURING CONSTRUCTION AT LOCATION OF FLAPGATES.


NAPOLEON             MAPOL=bN                           HENRY                OH  MAUHEE  RIVER  BASIN   1977      263
 ISSUE:         PHYS tNV
 PREDICTION:
 FINDINGS:


 MORE FINDINGS: NO LONG-TERM PHYSICAL ENVIRONMENT CHANGES HAVE OCCURRED DUE TO PROJECT  CONSTRUCTION.



RIDGEVlLLf CCRN3RS   HENRY COUNTY(3IDGEVILLE COPNERS)   HENRY                OH  MAUMEE  RIVER  BASIN   1976      26*

-------
06AUG87            AS PPED'CTEO TO B«fTT:R THAN PREDICTED
                        (f:Y «IViR RASIH)

CITY                 GO ANT EL                            COUNTY               ST RIVER  BASIN         NEPA(YR)
 ISSUE:         PHYS CUV
 PREDICTION:    CONSTRUCTION NOISES MAY^' I«OVE DESIRED LEVELS t DISRUPTION OF VEHIC/PEDES. TRAFFIC MILL BE TEMP t WIN
 FINDINGS:      TH= PLT. OP^RA-TOR INDICATED THERE WERE NT PROBLEMS OF SIGNIFICANCE  ASSOC. w/ NOISE OR TRAFFIC.


 MORE FINDINGS: AS TH£ FACILITIES PLAN STATED, CONSTRUCTION IMPACTS H~R£ TEMPORARY  AND APPARENTLY MINIMAL
                NO UNUSUAL P^OHLEMS OCCURRED TO PRESENT A SIGNIFICANT OISTRUBANCE OR DISRUPTION


TOLEDO            <   TOLEOO-WALBRIDGE                   WOOD                 OH MAUMEE RIVER BASIN  1980     265
 ISSUE:         PHY3 sMV
 PREDICTION:    THE PROJECT SHOULD NOT IMPACT FLORA AND FAUNA IN THE AREA.
 FINDINGS:      SEWER R£HAUILITAION WAS ACCOMPLISHED THROUGH EXISTING RIGHTS-OF-WAY.
                \ SMALL &L4Y-PARK HAS CONSTRUCTED WITH JVERBUROEH WHICH WAS NOT USED FOR THE PRO

 MORE FINDINGS: $:WER REHABILITATION UAS ACCOMPLISHED THROUGH EXISTING RIGHTS-OF-WAY,  NO FLORA OR FAUNA WAS IMPACTED.
                A SHALL PLAY-PARK WAS CONSTRUCTED WITH CVERBUROE WHICH WAS NOT USED FOR THE PROJECT.


TOLEDO               TOLrDO.CITY QF (TEN MILE CREEK)    LUCAS                OH MAU1EE RIVER BASIN  1977     266
 ISSUE:         PHYS rHV
 PREDICTION:
 FINDINGS:


 MORE FINDINGS': NO LPHG TERM PHYSICAL IMPACTS WERE PPEOICTED OR DISCOVERED



TOLEDO               TOLEDO,CITY QF (BAYVISW)           LUCAS                OH MAUMEE RIVER BASIN  1980     267
 ISSUE:         PHYS ENV
 PREDICTION:    THE FILLING OF THE MOORING &ASIM WITH RIVER SEDIMENT FROM CHANNEL DREDGING WILL INCREASE TURBIDITY.
 FINDINGS:      &PPROXIMITLY 2.5 ACP.FS OF TH?--GORING BASIN WAS FILLED IN, TURBIDITY AROUND PLANT MAS ONLY TEMPORARY


 MORE FINDINGS: TURBIDITY NcAR PLANT WAS ONLY TEMPORARY DURING FILLING QF THE MOORING  BASIN. NO LONG TERM  IMPACTS  HAVE
                PC-JN lOcNTiFi'jO RIIARDING THI FILLING PF THE MOORING EASIN.


UNIDPCLIS            UNIOPOLIS,VILLAGE OF               AUGLAIZE             OH MAUMEE RIVER BASIN  1977     268
 ISSUE:         PHYS t-NV
 PREDICTION:    no IMPHRMFIIT OF LAMOSCAP';.
 FlhOIIIC-S:      UC IMP1CTS W5K: ?VID?MT.


 MORE FINDINGS: no IMPACTS LV^OENT.



WESTON               WFSTON,VILLAGE OF                  woao                 OH MAUMEE RIVER BASIN  1979     269
 ISSUE:         PHYS btiv
 PREDICTION:    NOISE AMD DISRUPTION OF TRAFFIC WILL OCCUR DURING CONSTRUCTION.
 FINDINGS?      OPERATOR STATED NO IMPACT.


 MORE FINDINGS: THE OPTRATQR STATED THAT THERE WAS NO SIGNIFICANT DISRUPTION ASSOCIATED MITH NOISE OR TRAFFIC.

-------
06Aur,E7
CITY
   AS PREDICTED  TO  BETTSR  THAN  PREDICTED
        (8V PIVEP BASIN)
     GP.ANTEL                             COUNTV
                                                                             ST RIVER BASIN
                                                                                                     NEPA(YR)
HESTPN
 ISSUE:
 PREDICTION:
                                         WOOD
                                                              OH MAUMEE RIVER BASIN  1979
                    WESTON,VILLAGE  OF
               PHYS EHV
               STPECTS AfiD OTHER  AREAS  WILL  BE  DISTURBED BUT  WILL  9= REPAVEO OP SEEDED AFTER CONSTRUCTION.
               OPERATOR  STAT?0  NO  IMPACT.
                                                                                                               270
 MORI  FINDINGS:  TUFRE  WAS  S^ME  DELAY WITH PEPAVING.
                 THERE  WiiPE LCCASICNAL PSOPLEMS C <= SINKING ACROSS ASPH4LT I NATURAL TRENCHES WHICH WERE  CORRECTED.
                 NO  PPEScNT PROBLEMS  EXIST.
                                                         FILLMORE
                                                              MN UPPER MISSISSIPPI
                                                                                                      1981
                                                                                               271
 ISSUE:
 PREDICTION:
 FIMC'INGS:
                    PUSHFOFD.CITY Cr
               PHYJ tNV
               4NY AtVERS:  IMPACTS  OF CONSTRUCTION  WILL  "E  SHORT•TERM.EPOS ION CONTROLS WILL BE IMPL.AFTER CONSTRUCTN
               NO EVIDENCE  TF EROSION AT  SITE.  STORM  WATEP  PONO FOR FLOOD CONTROL ADJACENT TO NEW PLANT ACROSS DITCH.
               PLANT flPP^IU'S NOT TO HAVE  ADVERSE  EFFECT  ON  DIKE.  SLUDGE STILL SPREAD AT MUNICIPAL AIRPORT.
               OLD PLANT STILL NOT  DEMOLISHED.  CITY MAY  TEAR  DOWN  SOON. OLD FARM BUILDINGS ALSO STILL ADJACENT SITE.
PORE FINDINGS: ALL EXCAVATION FCR SEWER EXTENSIONS  FECLNTLY  BESIDE  ROADS. NO EVIDENCE OF DRAINAGE/EROSION PROBLEMS
               OLD BUILDINGS (SEWAGE PLANT  t FARM)  NOT  YZT  TORN CCWN.  CITY MAY FIND NEW SLUOGE SITE IF BIROS
                         TO AIRPORT BY SLUDGE SPREADING  THERE.  ACTUAL  SITE WELL MAINTAINED t ATTRACTIVE.

                                                                                                             272
ALMA
ISSUE:
PfirOKTJCN:
FINDINGS:
ALMA "UN 1C I PAL WASTEWfTFR T9MT PLT BUFFALO WI UPPER MISSISSIPPI
• PHYS INV
TH:tE WILL t:i T^MPORAPY IMPACTS RESULTING FSOM CONSTRUCTION.
THERE APE NC G^SEPVAPLE IMPACTS ASSOCIATED WITH THE PROJECT.
IMPACTS THAT DID OCCUR W2»E T£MPORARY.
1980
 MORE FINDINGS: SHORT-T-PM  IMPACTS  TO  THE  PHYSICAL  ENVIRONMENT OCCURRCD AS A RESULT OF CONSTRUCTION.
                NO OTMT.& I»'PBCTS WEPC  OBSc'VEC.
AUGUSTA
 issu::
 PREDICTION:
 FINDINGS:
                                         5AU  CLAIPE;
                                                                             WI  UPPcR MISSISSIPPI   1977
     AUl,USU,C!TY Of
PHYS c'lV
SHORT Tt'RM HQISE.DUST, I TRAFFIC.THE  STRFAM  WILL  NCT  B5 AFFECTED BV CONSTRUCTION ACTIVITIES.
THERE WERE NO ADVISE CONSTRUCTION  IMPACTS.
         273
 MORE FINDINGS: THE  SIT-  IS  GfMSSEO  WITH  NO  EROSION PROBLEMS.THE PLANT IS NOT CONSPICUOUS. NO  IMPACT  ON  THE  PHYS.  ENV.
6ANGOR
 ISSUE:
 PREDICTION:
 FINDINGS:
                                         LACROSSE
                                                                             WI UPPER MISSISSIPPI
                                                                                     1973
         274
     ('ANGOr .VILLAGE C*
PHYS HIV/SOIL:
PtMQvAL OF VEGETATION MAY RESULT  IN  SOME  EROSION  OF  SOIL  IN  THE AREA. TEMPORARY EFFECT
STRAW WAS LAID ON SLOPc AWAY FROM CONSTRUCTION  SIT1:  TO  PR5VFNT  EROSION. NO EVIDENCE OF EROSION NOW.
 MORE FINDINGS: NO  EVIDENCE  OF  FAST  EROSION.  MITIGATED BY LAYING STRAW DURING CONSTRUCTION.RUNOFF PREVENTED  NOW  BY  A
                STORM  POND
BIRCHWOOO
 ISSUE:
 PREDICTION:
     DIP.CHWCOOiVlLLAGE CF
PHYS HIV
                                                        WASHBURN
                                                              WI UPPER MISSISSIPPI
1982
                                                                                              275

-------
06AUG87
AS PPEDTCTEO TC SETTER THAN PREDICTED
     CdY ?!VtR BASIN)
CITT                 GPANTEE                            COUNTY                ST  RIVER  BASIN
 FINDINGS:       MINIMAL NCISE FPOM AERATION-BLOWERS. BUILDING HAS  BEEN  SOUND  INSULATED.
                SiTE IS PARTLY SCREENED BY TPEfS ALONG ROAD.
                NEAREST RESIDENCE IS  ACROSS ROAD.
 MORF FINDINGS: NO IMPACT PREDICTIONS MAOE
                                                                                  NEPA(YR)
BRUCE
 ISSUE:
 pptDICTTON:
                                     RUSK
                     WI UPPER MISSISSIPPI   1983
                                                                                                              276
                    BPUCE,VILLAGE OF
               PHYS ENV
               SM1LL AMOUNT OF rOTSIQN I SEDIMENTATION FOR  SHORT-T^PM,SLIGHT  INCREASE  IN NOISE LEVEL
               OCCASIONAL SLIGHT  INCREASE  IN NOISE LEVEL  WHEN  BLOWERS  IN  OPERATION,BUT  SITE  IS REMOTE.
               SITE PE&3ASSED WITH NO VISUAL EROSION EVIDENT,  OLD  BERN  MATERIAL  USED  TO BUILD NEW BERMS.

MORC FINOTNGS: MINIMAL OR no IMPACT ON PHYSICAL ENVIRONMENT  oescRvi:o
               OPrRATOR PO^S-NT IN 197? (THOUGH 21D NTT WORK AT  PLT.)  t DID NOT  CONFIRM ANY  ERODING/SEDIMEN. PROBLEMS
               PROBAPLY SCM? CP.OSION OCCURRED AT  ACTUAL CONSTRUCTION TIME.
PRUC5
 ISSUE:
 P320KTION:
 FINDINGS:
                .IF
RUSK
                     HPUC",VILLAG:
                PHYS LNV/TQPO
                AiSTHc.TIC  IMPJCT OF  THE  PROJECT  WOULD  3E  ONLY  MARGINAL
                MC HOMES UITHIN  750  FT,  TREES FJRM  A  PARTIAL  VISUAL  BARRIER.
                VISUAL  APPrJ'ANCC  COMPflT!?LE WITH SURROUNDING  AR^fi.
                                                                             WI  UPPER  MISSISSIPPI    1980
277
      FINDINGS: MC IMPACT CF.
                                     ASHLAND
PUTTEKMUT
 ISSIH:
 PREDICTION:
 FINDINGS:
 MOP? FINDINGS: BIDS AMf> 3ttiKi WE^S PISTORSD AS PREDICTED, ALTHOUGH  ROUTE  WAS  REVISED
                     WI UPPER MISSISSIPPI
                                                                                                     1981
                    L,UTT:C(IUT,VILLAGE i*
               PHYS 1NV
               ONC CRCJSING JF BUTTERNUT CRK.   BEDS  AND  BANKS  OF  CRK  WILL  BE  RESTORED  TO ORIGINAL CONDITIONS
                      ii. ia:gM = NT IN FLOODPLAjn  IS  SPPAP-NT  ?=CAUSr  NO TRFES
                    tjUT C7ASI IS GROWING AND C^EER PATH  IS  UNDISTURBED.
278
                                                                              WI  UPPER  MISSISSIPPI
                                                                                  1983
                                                     279
C03NCLL              COTHELL.CITY OF                     CHTPP5WA
 issue:         PHYS LHV
 PREDICTION:
 FINDINGS:      S:MC= TH? P^OJ-:CT WAS  AT THE  EXISTING  SITE  THESE  WAS  LITTL; IMPACT  BESIDES SHORT TERM CONSTRUCTION ETC
                TH? SEWER LINE F; CH A3ILIT4T ION PROCEEDED  WITH  NO  LONG  TERM  IMPACT.  ROADS,ETC.  REPAVED

 MORE FINDINGS: THERE wdRz in DISRUPTIONS  TO  THC  PHYSICAL  ENVIRONMENT ASSOCIATED WITH THIS PROJECT
CUMBERLAND
 ISSUE:
 PREDICTION:
 FINDINGS:
                                                         BARRON
                                                          WI UPPER  MISSISSIPPI    1978
                                                      280
                     CUMBERLAND,CITt OF
                PHYS cNV
                SHORT DURATION CONSTRUCTION  RELATED  IMPACTS.TEMPORARY  DISRUPTION OF STREAM BOTTOM BY INTERCEPTOR.
                STREAM FLOWING NORMALLY.NO EVIDENCE  OF  LONG-TERM IMPACT  ON THE STREAM.
 MORE FINDINGS: VISUAL OBSERVATIONS SHOWED NO LONG-TERM  IMPACTS  TO  TH=  STREAM.

-------
C6AUG87
CITY
OE SQTO
 ISSUE:
 PREDICTION:
                   AS PREDICTED TO 3ETT5R THAN PREDICTED
                        (3V RIVER BASIN)


                     GRANTS                            COUNTY
                     ST RIVER BASIN
                                                NEPA(VR)
                                                        VERNON/CRAWFORD
                     WI UPPER MISSISSIPPI   1978
                                                                                                              281
                     GESOTO,VILLAGE TF
                PHYS ENV
                REMOVAL OF VEGETATION MAY LEAD TO EROSION  OF  THE  SOIL  IN  THE  AREA  OF  CONSTRUCTION
                AREAS OF  5IT= CLEANED ^OR NEW PLANT WERE ALREADY  LEVEL. EROSION  CONTROL  IN  PLACE DURING  CONSTRUCTION.
                PLANT LOCATED ON EXISTING SITE SOUTHWEST OF VILLAGE  OF  DE  SOTO BETWEEN CB»0 TRACKS  *  MISS

 MOKE FINDINGS: NO SIGNIFICANT EROSION PROBLEM OURING OR SINCE  CONSTRUCTION
                                                         BUFFALO
FOUNTAIN CITY        FOUNTAIN CITY,CITY OF
 ISiUE:         PHYS FUV
 PREDICTION:    FUGITIVE OUST PARTICLES WILL BE CONTROLLED  BY  WATER  SPRAY  APPLICATION
 FINDINGS:      NO DUST PROBLEMS APPARENT TO OPERATOR: NO COMPLAINTS.
                     WI UPPER MISSISSIPPI
                                                1979
                                                                                                              282
 MORE FINDINGS: NO PCC2L:«? WIT" DUST  H-.S:  INDICATED.
PHILLIES
 ISSUE:
 PREDICTION:
 BINDINGS:
                     PHILLIPS,CITY OF
                "HYS !UV

                NO UNUSUAL PHYSICAL IMPACTS NOTICED.
PRICE
                         WI  UPPER MISSISSIPPI   1983
                                                                                              283
 MIRE FINDINGS: NO IMPACTS DISCUSSED IN NEPA DOCUMENT
PLUM CITY
 ISSUE:
 PREDICTION:
 FINDINGS:
                     PLUM CITY,VILLAGE 3F
                PHYS '. NV
                THERE H;LL BE TEMPORARY IMPACTS TO
    PIERCE                WI  UPPER MISSISSIPPI   1979

\i  PHYSICAL  ENVIRONMENT AS A RESULT OF CONSTRUCTION.
                                                     284
 NOR? FINDINGS: SHORT-THRU »MPHCTS  TO TH; PHYSICAL  ,:NVIRONMENT  OCCURRED  AS  A  RESULT OF  CONSTRUCTION.
                NO CTHER IMPJCTS UERF
STRUM                STRUH.VILLAGi OF                    TRrMPrALEAU
 ISSUE:         PHYS LMV
 PREDICTION:    THrRE WILL EF  SHORT-TERM DISRUPTIONS  DUE TO  CONSTRUCTION
 FINDINGS:      MINOR SHOPT-TcPM DISRUPTIONS  DURING CONSTRUCTION.
                THS TR^ATMJIlT  UNITS  ARE ENCLOSED AND  THu STT1!  IS LANOSCAP50.
                                                                              WI  UPPER  MISSISSIPPI
                                            1980
                                                         285
 MORE FINDINGS: SHORT-TERM IMPACTS TO  TH?  PHYSICAL  ENVIRONMENT  OCCURRED  AS  A  RESULT  OF  CONSTRUCTION
                NO UTHER IMPACTS WEPE  OBSEPVEO.
WESTBY
 ISSUE:
 PREDICTION:
 FINDINGS:
                                                        VcSNGN
                     WI UPPER MISSISSIPPI   1979
                                                         286
     WE5TEY ScWAGE TREATMENT PLANT
PHYS CNV
REMOVAL OF VEGETATION MAY LEAD TO EROSION NEAR CONSTRUCTION  ESP  ON  SLOPES  WHERE  INTERCEPTOR  IS BUILT,
NO PTPORTS Or SIGNIFICANT rROS'JN OP GULLYIHG DURING CONSTRUCTION OR  SINCE.

-------
                               TC SETTER THAN  PREDICTED
CITV
                                                        COUNTY
                           OF Q^SEKViO CRCSION  IMPACTS.
ST RIV5R BASIN
NEPft(TR)
                             . CITY OF                  GRATIQT               HI SAGINAW RIVER BASIN  1976      Z87
     LCUIS


       b


       FINDINGS:


           "	     StGINSH COUNTY MTP                  TUSCCLA               MI SAGINAW RIVER BASIN  1977      288
 ISSUt:         PMYi SNV
 Pft OKTION:
 FIliM'.C-S:      HC rntSlCAL -rMVIPONWrNTAL IMPACTS  OCSERVCD.


 MDf r  riioisCS:



CL*CMIV       '       GLAOMTILCITT OF               .,      GLAOMIN               MI SAGINAM RIVER BASIN  1976      289
 ISSUC:         PMYS fNV
 pRtoicrrcn:    F;VE AOCITICN/IL SLUDGE DPYING  PHOS OCCUPYING «,ooo  SQUARE FEET WILL  BE  LOCATED ON EXISTING TREATMENT F
 FTnr:»it.s:      TMT ? siuont O»YING BEDS ^UILT  DUPING THE PLANT  EXPANSION ARE NOT  B^ING
                USrP AT THIS HMT.

 HOPE  Fiucms:



     1,               UAKLAMD COUNTY OPH                  OAKLAND               Ml SAGINAM RIVER BASIN  1977      290
 issut:         PHYS tnv
 PPtDICTIJH!    T.IT PHYSTC6L JNVIRONM3NT AT AHO  AROUND T-1t SITE  WILL  NOT  BE DEGRADED.
 rif.ni-iGS:      CCNSTRUCTION IMPACTS WERE SHORT-TERM AND APPROPRIATE  MITIGATIVE MEASURES WERE
                "it:0 INCLUDING FENCING DURING CONSTRUCTION AND RESIDING  AND REPLANTING
                »FTEP CONSTRUCTION.
       FINDINGS:


                          ^^^^«.^—•^^^^^^•^^^^^•.••••»^^^~>^^«>B*^^^OBi^^^lB^^^^^«*^t»^«»M*^^^^^^«»^^«***^^^*IB^^^^^^^^^^
                PHTS '•••'EER.CITt  OF                      LAPESR                Ml SAGINAW RIVER BASIN  1976      291
 PREDICTION:    coimoiirT.,,
 FINOI»'GS:      T"«P««?C ION I*P*»CTS WILL BE TEPPO^APY.
                 -"^ORARY CONTROLS  UStD TO RESTRAIN  SOIL EROSION.

 MORE  FINDINGS:



TJTTABAWASSEE T«P    "
                               E;  fWP WHTP              SftGINAU               MI SAGINAW RIVER BASIN  1979      292

-------
06AUG87
                   AS PREDICTED TO RfTTirR THAN PREDICTED
                        (BY RIVEP BASIN)
                                                                             ST RIVER BASIN
CITY                 GRANTEE                            COUNTY
 ISSUE:         PHYS EtIV
 PREDICTION:
 FINDINGS:      GOOD CONSTRUCTION MGMT AND MITIGATION TECHNIQUES PREVENTED ANY POTENTIAL ADVERSE
                IMPACTS FROM OCCURRING.

 MOR = FINDINGS:
NEPA(YR)
FORT U»YNt           FORT WAYNE,CITY OF (SEWERS)        ALLEN                IN MAUMEE RIVER BASIN  1980     293
 ISSUE!         CULTURAL RESOURCE
 PREDICTION:    NO POSSIBLE EXISTENCE OF ARCHAEOLOGICAL SITES in THE SERVICE AREA.
 FINDINGS:      NO ARCHAEOLOGICAL SITES OISTURBED.


 MORE FINDINGS: ?ALL STATE DID A STUDY AND DIP NCT FIND »NY ARTIFACTS IN THE CONSTRUCTION ZONE.NO HISTORICAL OR ARCHIT
                rCTURAL STRUCTURES AFFECTED BY CONSTRUCTION.


MONROEV1LLC          MONROfVILLE,5Wi DISPOSAL AUTH      ALLEN                IN MAUMEE RIVER BASIN  1980     29*
 ISSUE:         CULTURAL RESOURCE
 PREDICTION:    THERE ARE NO KNOWN ARCHITECTURAL OR HISTORICAL SITES IN THE AREA
 FINDINGS:     • NJH£ HF THESE TYPES OF SITES WERE DISTURBED OR W^PP IN THE LINE OF SITE OF CONSTRUCTION


 MIR?: FINDINGS: NO IMPACT OH CULTURAL RESOURCES. '••'



ADA                  iOA i=:WV3? T9E4TKFMT PLANT         HflPOIN               OH MAUMEE RIVER BASIN  1976     295
 ISSUE:         CULTU?JL RESOURCE
 PREDICTION:    NO IMPSCT WILL OCCUR AT EITHER HISTORICAL BUILDING DIRECTLY FROM THE PROJECT.
 FINDINGS:      NO IMPACT Oh HITHER STRUCTURE OCCURRED FROM CONSTRUCTION.


 MOSC FINDINGS: TH= CONSTRUCTION DID NOT DISECTLY AFFECT ADA'S HISTORICAL BUILDINGS



ADA                  ATA SCWAGE TRCATN?NT PLANT         HARDIN               OH MAUMEE RIVER BASIN  1976     296
 ISSUE:         OTHER REC3FAMDN
 PREDICTION:
 FINDINGS:      THE ADA DISPOSAL SITE OF DIRT FROM CONSTRUCTION is USED FOR SLEDDING IN THE WINTER.


 MORE FINDINGS: NO SIGNIFICANT IMPACT was PREDICTED OR OCCURRED.SHALL HILL PROVIDES AREA FOR WINTER SLEDDING.


• «»«•<••« •(••.•va>v_
-------
C6AUG37



CITY
                   AS P^EDIC-TEO TO SETTER THAN PREDICTED
                        --" nV£R RASIN)
GRANT=c
COUNTY
                                                                              ST  RIVER  BASIN
NEPA(VR)
HARROD               HARROD.VILLAGE OF                  ALLEN        .         OH  MAUMEE  RIVER  BASIN   1977      298
 ISSU::         CULTURAL RESOURCE
 PREDICTION:    no KNOWN HISTORIC OR ACRHAEOLOGICAL SITES WILL  BE  AFFECTED
 FINDINGS:      N3 IMPACTS W = R; KNOWN TO HAVE OCCURRED.


 MORE BINDINGS: NO-IMPACTS WERE KNOWN TO HAVE OCCURRED.  NO KNOWN  HISTORIC  OR  APCHAEOL  SITES  IN  THE  AREA.



NAPOLEON             NAPOLEON                           HENRY                 OH  MAUMEE  RIVER  BASIN   1977      299
 ISSUE:         CULTURAL RESOURCE
 PREDICTION:
 FINDiM&s:      NO ARCHAEOLOGICAL SITES WERE DISCOVERED.PLANT SETTING WAS REPORTED  TO BE  FILL AREA.


 MORE FINDINGS: NO ARCHAEOLOGICAL OR HISTORICAL SITES WERE IDENTIFIED. .



RIDG2VILLE CORNERS   HENRY C OU'IT Y( RIOGEVILLE CORNERS)   HENRY                 OH  HAUHEE  RIVER  BASIN   1976      300
 ISSUE:        . CULTURftL RESOURCE
 PPEDICTION:   ' t;o KNUWU HTSTOR.C*L OR CULTURAL SITSS WILL 3? IMPACTED.
 FIKOINGSS      NO IMfACT.                       ':               .


 MOKE FINDINGS:



70LEDO               TOLFDO,CITY OF (TEN HILf CRfcK)    LUCAS                 OH  NAUME£  RIVER  BASIN   1977      301
 ISSUE:         CULTURiL RriQ'J'CE
 PREDICTION:
 FTNOINGS:


 MORE FINDINGS: NO CULTURAL issues WE?? ADDRFSS^O



TOLEDO               TOL=00,CITY OF (3AYVI5W)           LUCAS                 OH  MAUMEE  RIVER  BASIN   1983      302
  ISSUE:         CULTURAL i^SOURCE
  PREDICTION:    TH^RE ARE NO KNOWN ARCHA=OLOGICAL RESOURCES IN  TH?  A^EA OF  THE PLANT
  FINDINGS:      NO KNOWN ARCHAEOLOGICAL SITES.


  MORE  FINDINGS: ARCHAEQLOGIC»L RFSOURCES MIGHT POSSIBLY EXIST IN THE AREA OF  THE  PROPOSED RESERVOIR.  AS PART  OF THE
                PROJECT, AN ARCHAEOLOGICAL  SURVEY WAS PERFORMED. NO ARCHAEOLOGICAL  RESOURCES  WERE FOUND.


 UNIOPOLIS           UNIOPOLIS.VILLAGE UF               AUGLAIZE              OH  MAUMEE  RIVER  BASIN   1977      303
  ISSUE!        CULTURAL RESOURCE
  PREDICTION:

-------
 CITY
  FINDINGS:
    AS PREDICTED TO BETTER  THAN PREDICTED
         CEY RIVER BASIN)

      GRANTED
                                                         COUNTY
                                                              ST  RIVER  BASIN
                                                                                      NEPACYR)
 NO EFFECT ON HISTORICAL,  ARCHAEOLOGICAL OR CULTURAL VALUES WERE EVIDENT.
  MORF FINDINGS: NOT AN issue
 WESTON
  ISSUE:
  PREDICTION:
  FINDINGS:
                                                         WOOD
                                                              OH MAUMEE RIVER BASIN   1979
     WESTON,VILLAGE OF
CULTURAL RESOURCE
TH: PROJECT WILL NOT IMPACT HISTORICAL/ARCHAEOLOGICAL SITES.
THERE ARE  CURRENTLY NO PROBLEMS WITH ASSOCIATED HISTORICAL/ARCHAEOLOGICAL  AREAS.
                                                                                              304
  MORF FINDINGS:  PREDICTION  WAS  ACCURATE.
  ISSUE:
  PREDICTION:
  FINDINGS:
                                                         FILLMORE
                                                              MN UPPER MISSISSIPPI
     RUSHFOPO.CITY OF
CULTURAL R=SCU"C':.
THE PROJECT WILL NOT IMPACT ...LOCAL  CULTURAL  OR HISTORICAL POINTS OF INTEREST
NOTHING OF CULTURAL INTEREST DISCOVERED  DURING CONSTRUCTION.
                                                                                      1900
                                                                                              305
 MORE FINDINGS: NO  IMPACT  »PPA'?HT.
«LMA                 ALMA MUNICIPAL  WASTEWATER TRMT PLT BUFFALO
 ISSUE:         CULTURAL RESOURCE
 PREDICTION:    no HISTORICAL,CULTURAL  OR  ARCHAEOLOGICAL SITES WILL BE AFFECTED
 FINDINGS:      Nl HISTOPICAL,CULTURAL  OR  ARCHAEOLOGICAL SIT5S WER? AFFECTED.
                                                              WI UPP2R MISSISSIPPI
                                                                                     1980
                                                                                               306
      FIKOINGS: PREDICTION ws  ACCU?AT=.
ALMA
 ISSUE:
 PREDICTION:
 FINDINGS:
     ALMA MUNICIPAL WASTCWAT!:R TRMT  PLT  BUFFALO              WI UPPER MISSISSIPPI    1980
PHYS thV/TOPO
AESTHETIC IMPACTS WILL BE MITIGATED  THROUGH ENCLOSURE OF THE TREATMENT UNITS AND LANDSCAPING.
NO AESTHETIC IMPACTS HAV5 CCCUPR£0.
                                                                                              307
 MORE FIHOTNGS: THE MITIGATION  MEASURES WERE IMPLEMENTED. MO ASTHETIC IMPACTS HAVE  OCCURRED.
AUGUSTA
 ISSUE:
 PREDICTION:
 FINDINGS:
                                         EAU CLAIRE
                                                              WI UPPER MISSISSIPPI   1977
                                                                                              308
     AUGUSTA,CITY OF
CULTURAL RFSOURCE
NO KNOWN ARCHEOLOGICAL,HISTORICAL  OR  SCIENTIFIC SITES WILL BE AFFECTED BY CONSTRUCTION  AT  THIS SITE.
TH^RE HAW; Bc:N NO CULTURAL  IMPACTS.
 MORE FINDINGS: TH?RE WERE no CULTURAL  IMPACTS AS PREDICTED.

-------
06AUGS7
CITY
                  AS PREDICTED TO BETTER THAN PREDICTED
                       («Y ">mR BASIN)


                    GRANTEE                            COUNTY
                                                             ST RIVER BASIN
                                                                                                    NEPA(TR)


                                                                                                    1978     309
BANGOR
 ISSUE:
 PREDICTION:
 FINDINGS:
                                                       LACROSSE
     (UNGOP,VILLAGE OF

CULTURAL RESOURCE
NO KNOWN ARCHAEOLOGICAL OR HISTORIC REMNANTS THAT NEED TO BE PRESERVED
NO HISTORIC MATERIAL UNEARTHED DURING EXCAVATION.
WI UPPER MISSISSIPPI
 MORE FINDINGS: NO ARCHEOLOGICAL OR HISTORICAL MATERIAL AT SITE
BARRDN
 ISSUE:
 PREDICTION:
 FINDINGS:
                    BARRON.CITY OF                     9ARRON
               CULTURAL RESOURCE
               NO HISTORICAL/ ARCHAEOLOGICAL SITES IN AREA
               NO SIGNIFICANT SITES FOUND IN CONSTRUCTION.
                                                             WI UPPER MISSISSIPPI
                                                                                                    1980
                                310
 MORE FINDINGS: NO SIT~S FOUMO
BIRCHWOOD            BIRCHWOOD,VILLAGE ]F               WASHBURN
 ISSUE:          CULTURAL RC-SOURCc
 PREDICTION:     NO HISTORICAL OR CULTURAL IMPACTS
 FINDINGS:     •  NG ARTIFACTS FOUND OURIN. CONSTRUCTION.
              !  4R:A A?OUNO SlU APPEARS TO HAVE-BEEM PREVIOUSLY DISTURBED.
                                                                             wi UPPER MISSISSIPPI
                                                                                                   1982
                                                                                             311
MORE FINDINGS: THE
                       t HAS NO KNOWN HisTt ARCHAEOLI OR CULTURAL SIGNIFICANCE.
BRUCE
 ISSUE:
 PREDICTION:
 FINDINGS:
                                                       RUSK
     BPUC?,VILLAGE OF

CULTURAL RESOURCE
NO KNOWN HISTORICAL OR APCH^OLOGICAL SITES WILL 33 AFFECTED
NO HISTORICAL OP ARCHEOLOGICAL SITES FOUND DURING CONSTRUCTION.
                                                                             WI UPPER MISSISSIPPI
                       1982
312
 MORE FINDINGS: NO IMPACT NCT.-O.
BUTTERNUT
 ISSUE:
 PREDICTION:
 FINDINGS:
                    BUTT5RHUT,VILLAGE OF               ASHLAND
               CULTURAL R?SOURCF
               NC HISTORiCAL/CULTURAL SITES WILL BE AFFECTED BY THE PROJECT
               NO HISTORIC SITES FOUND.
                                                             WI UPPER MISSISSIPPI   1981
                                                                                                             313
 MORE FINDINGS: NO IMPACT CM CULTURAL RESOURCES
CORNELL
 ISSUE:
 PREDICTION:
 FINDINGS;
                    CORNELL,CITY OF                    CHIPPEWA
               CULTURAL RESOURCE
               NO ARCH OR HISTORICAL SITES IN AREA
               THERE HAVE BEEN NO IMPACTS ON CULTURAL RESOURCES*
                                                             WI UPPER MISSISSIPPI   1980
                                                                                                             314

-------
06AUG8T             AS  PREDICTED  TO  BETTER  THAN PREDICTED
                         (BY  RIVER BASIN)

CITY                 GRANTED                            COUNTY                ST  RIWER  BASIN         NEPftCYR)

  MORE  FINDINGS:  NO  IMPACTS  ON  CULTURAL RESOURCES SINCE CONSTRUCTION  AT  AN  EXISTING PLANT AND NO NEW SEWER LINES BUILT



OE  SOTO              D?SOTO,VILLAGE OF                  V£RNON/CRAWFORD      WI  UPPER  MISSISSIPPI    1978     315
  ISSUE:          CULTURAL RESOURCE
  PREDICTION:     NO  ARCHAEOLOGICAL,  ARCHITECTURAL OR HISTORICAL  SITES EXIST  AT THE  AREA CONSIDERED  FOR EXPANSION
  FINDINGS:       NO  SIGNIFICANT SITES OF FIUDS IN VICINITY.


  MORE  FINDINGS:  NO  SIGNIFICANT SITES FOUND DURING OR  AFTER  CONSTRUCTION



FOUNTAIN CITY        FOUNTAIN CITY,CITY OF              BUFFALO              WI  UPPER  MISSISSIPPI    1979     316
  ISSUE:          CULTURAL  RESOURCE
  PREDICTION:     THERE  «RC NO HISTORICAL OR ARCHAEOLOGICAL  SITES IN AREAS AFFECTED  BY  THE PROJECT.
  FINDINGS:       NC ARCHAEOLOGICAL OR HISTORICAL SITES.


  MORE  FINDINGS:  NO ARCHAEJL OR HISTORICAL  SITES.


——__—••—-—____—__—______ _____________________>.._________•___________—________ _«______>________>___>••«,._____..._.
PHILLIPS       '      PHILLIPS,CITY OF            .,       PRICE                 WI  UPPER  MISSISSIPPI    1980     317
  ISSUE:         CULTURAL RESOURCE                "
  PREDICTION:    NO KNOWN  SITCS JF HISTORICAL OR URCHACOLOGICAL  SIGNIFICANCE  ARE  EXPECTED TO BE  AFFECTED
  FINDINGS:       PLANT LOCATrD 4$ 3HOWN IN  FNSI. NO CULTURAL OBJECTS  AT  PLANT SITS.


  MORE FINDINGS: NO CULTURAL IMPACTS



PLUM CITY            PLUM CITY,VILLAGE OF               PIERCE                wi  UPPER  MISSISSIPPI    1979     318
  ISSUE:         CULTURflL RESOl'PCT
  PREDICTION:    NO HISTOPKAL,CULTURAL OR  »RCHEOLOGICAL SITES EXISTED IN THE PROJECT  AREA.
  FINDINGS:


  MORE  FINDINGS: NO IMPACT RESULTED.



SHELL  LAKE           SHELL LAKE,CITY OF                 WASHBU°N              WI  UPPER  MISSISSIPPI    1980     319
  ISSUE:          CULTURAL RESOURCE
  PREDICTION:     SITE HAS NO PREHISTORIC OR HISTORIC SIGNIFICANCE
  FINDINGS:       NO CHANGE IN SITE LOCATION SINCE ARCHAEOLOGIST'S REPORT.


  MORE  FINDINGS:  NO CHANGE iu SITE LOCATION. NO HISTORICAL  OR ARCHAEOL SITES  ARE  KNOWN  IN THE AREA.



STRUM                STRUM,VILLAGE CF                   TREMPEALEAU           WI  UPPER  MISSISSIPPI    198D     320

-------
C6AUG8T
CITY
 issue:
 PREDICTION:
 FINDINGS:
   flS PREDICTED TO  BETTER  THAN  PREDICTED
        Cf» KlViK BASIN)
     GRANTEc                             COUNTY
CULTURAL RESOURCE
NO HISTORICAL, CULTURAL  OR  ARCHAEOLOGICAL  SITES MILL BE AFFECTED
NC CULTURAL RESOURCES  AFFECTED.
                                                                               ST  RIVER  BASIN
NEPA(TR)
 MORE FINDINGS: NO HISTORICAL,  CULTURAL OR ARCHEOLOGICAL SITES MERE AFFECTED.
STRUM                 STRUM,VILLAGE OF                   TREMPfcALEAU          WI  UPPER  MISSISSIPPI    1980     321
 ISSUEI         OTHEP/RECREdTION
 PREDICTION:    RECREATIONAL  USE OF BUFFALO RIVER MILL NOT BE AFFECTED
 FINDINGS:      RECREATIONAL  USE OF BUFFALO R1V;? NOT 6FFECT50.


 MORE FINDINGS: NO  IMPACTS  TO RECREATION HAVE OCCURRED.



MESTPV                MFSTSY sewAGE TREATMENT PLANT      VERNON               MI  UPPER  MISSISSIPPI    1979     322
 ISSUE:         CULTURAL  PESOURCE
 PREDICTION!    NC  SIGNIFICANT SITES EFFECTED BY PROPOSED PROJECT.
 FINDINGS:      STAT?  PR?SCPVATIPN PLANNER FINDS NO RECORD OF ANY HISTORICAL OR  ARCHAEOLOGICAL FINDINGS IN CONSTRUCTIO


 MORE FINDINGS:* NO  HISTORICAL os ARCHAEOLOGICAL FINOS AT SITE.



ST. LOUIS             ST.  LOUIS,  CITY OF                 GRATIOT              MI  SAGINAM  RIVER  BASIN 1976     323
 ISSUE:         CULTURAL  RC:OU»CE
 PREDICTION:
 FINDINGS:      NO  IMPACTS  «*m mm mm, mm, mm *m mm mmt mm *m mm mm mm mm mm,   urn ^ mm> mm mm «• mm*m- mmmmmmmm mm mf mm mm. mm-^mmm^mtmM mm mmmmt 9JV ** mm mm mm
DURANO                DUR&NO.CITY OF                     SHIAUASSEc           MI  SAGINAM  RIVER  BASIN 1976     325
 ISSUE:         CULTURAL  R^SOUOCE
 PREDICTION:
 FINDINGS:      CONSTRUCTION  DIP NOT IMPACT GRAND TRUNK PR STATION.
 MORE FINDINGS:

-------
C6AUG8T
C:TY
AS PREDICTED TO BETTER THAN PREDICTED
     (fit 3IVEP BASIN)


  GRANT?;                            COUNTY
                                                                              ST  RIVER  BASIN
NEPA(YR)
 HOLLY                 OAKLAND  COUNTY  0PM                  OAKLAND               HI  SAGINAU  RIVER  BASIN  1977      326
  ISSUE:          CULTURAL  RESOURCE
  PREDICTION:     PROJECT WILL  NOT AFFECT  ANY HISTORICAL,  CULTURAL!  OR  ARCHAEOLOGICAL  RESOURCES.
  FINDINGS:       NONE  AFFECTED.


  MQR; FINDINGS:



 HOWELL                HOWELL,CITY OF                      LIVINGSTON           HI  SAGINAW  RIVER  BASIN  1976      327
  ISSUE:          CULTURAL  RESOURCE
  PREDICTION:
  FINDINGS:       ONLY  KNOWN, HISTORICi  SIT=  IN  AREA  IS  THE  ANN  ARBOR RR  STATION.
                 NOT IMPACTED.

  MORE FINDINGS:



LAPE'R         .       LAPFER.CITY OF                      LAPEER                HI  SAGINAW  RIVER  BASIN  1976      328
 ISSUE:         i  CULTURAL  5 = 30U=IC =
  PREDICTION:     HISTORIC, CULTURAL OR  ARCHAEOLIGICAL SITES OR  RESOURCES WILL  NOT  BE  AFFECTED.
  FINDINGS:       LAPEEF COUNTY COURT  HOUS? HOT  IMPACTED.


 MORE FINDINGS:



TITTA6AWASSEE  TUP     T ITT 4fi AW 1 SS E!: TUP WUTP              SAOINAU               HI  SAGINAW  RIVER  BASIN  197J      329
  ISSUE:          CULTURAL  RESOURCE
  PP.CDICTION:     NO CULTURAL R~SOURC£S  HILL  SE  IMPACTED.
  FINOINGS:       NO IHPACTS CCCUR^^D.


  MORE FINOINGS:



 FORT WAYNE            FORT UAYNF.CITY QF  (S'WERS)         ALLEN                 IN  HAUHEE RIVER BASIN   1980      330
  ISSUE:          SOLID WASTt
  PREDICTION:
  FINPI'IGS:       NO CHANG" IN  SLUDGE  QUALITY OCCURRED BECAUSE OF THIS  GRANT.


  MORE FINDINGS:  NOT AN ISSUE.


• « v « • W V • A V « •••••^•—.•••• • ^ —. — ^^w^*a
-------
C6AUG87
               A3 PPEDICT^D TO BETTER THAN PREDICTED
                    (L'Y RIV;R BASIN)
CITY                 I,PANT«=.:                             COUNTY               ST RIVER BASIN         NEPA(VR)
 FINDINGS;      SLUDGE HILL NOT  BE  REMOVED  FROM  THE  POND FOR ABOUT 20 YHARS.SLUDGE FROM THE CLARIFIER MILL STILL BE c
                SLUDGE FROM THf  CLARIFIiRS  WILL  STILL  BE GIVEN TO FARMERS, AS BEFORE.

 MORE FINDINGS: NO IMPACT TO SOLID  WAST:  PREDICTED OR  FELT  FROM THIS GRANT.
ADC
 ISSUE:
 PREDICTION;
 FIKDIUGS:
                 ADA SEWAGE TREATMENT  PLANT
            SOLIO UASTF/SLUDG;
HARD IN
                                                              CH MAUMEE  RIVER BASIN  1976
            LAUD APPLICATION THROUGH  A GIVEAWAY  PROGRAM  IS  USED  TO  DISPOSE OF SLUDGE
            MtTALS IN SLUDGE BELOW  STATE  GUIOILINeS: NI  $<».<.  MG/KG;
            m 179.9 MG/KG: en  zsi  MG/KG.   SLUDGE voL=96.50o
i- FINDINGS: NJ
                            WE?:  ANTICIPATED  AND  NONE  OCCURRED CONCERNING SLUDGE DISPOSAL.
                                                                                               332
CRTD'P.SVILLE
 ISSUE:
 PREDICTION:
 HOPE FINDINGS:
                                                                          OH MAUMEE RIVER BASIN  1977
                                                      333
     Cp:D?RSV:LLE,VILLaOr OF
SULIO WiSTr
4E*AT'_ 3LU?';?, 0»Y RESIDUS  IN FILTER BEDS, US;  FOR  SOIL  IMPROVEMENT, AS DONE IN PAST
SLUDG? IS LANO APPLIED AFTER OIGESTcR,SOMETIMES  BEPS.  SPRAYED FROM TANK TRUCK ONTO AGRICULTURAL LAND
SC^iOu? OALS .VPPLI'D  SIMC1;  1983. SLUDGE  APPLICATION PROGRAM SUBMITTED TO BOWLING GREEN EPA OFFICE.
SLUCGT; FH-l.o. MCTAL  LEVELS Ih MG/KG - C D= 9. 0 , CR = 3« . 9, CU = 1 8 70 , PB *l 8 7. 1 ,NI = 85 , ZN = 2891 ,HG= 1 2
SLUDGE IS L4NC APPLIED TO FARMLAND
A ^ ^ ^ ^ ^ •• ^ ^ ^«» ^ ^ ^ ^ ^ ^ ^^ ^ A* ^^ 4A^ ^ 4A «* •• ^ V

      Mft^POD,VILUGE OF
 SOLID WAST"

 NC SOLIDS UUULO Bl; GENFRATtD.
 NC SLUPGT Ii GEM'RATEO.
HARROC
 ISSUE:
 PREDICTION:
 FINDINGS:
                                                     ALLEN
                     OH MAUME: RIVER  BASIN   1977
                                                                                              334
 MORE FINDINGS: NO SLUDGE PRCDUCEO.
KALIDA
 ISSUE:
 PREDICTION:
 FINDINGS:
                 KALIDA, VILLAGE HF
            SOLID WASTE
                   G=NEniT=i NO SLUDGE
PUTNAM
                                                              OH  MAUMEE  RIVER BASIN  1976
                                                                                               335
 MOPE FINDINGS: NO SOLID WAST; PSUSLEMS  OCCUR  AND  NONE  HERE  EXPECTED.
 NAPOLEON
  ISSUE:
  PREDICTION:
                 NAPOLECN
            SOLID HASTE
                                                     HENRY
                     OH MAUMEE RIVER BASIN   1977
                                                                                              336
  MORE  FINDINGS:  SLUDGE GENERATION  AT  THE  TREATMENT  PLANT  was IN THE PAST BEEN USED as FERTILIZER FOR ROW  CROPS.THIS
                 PRACTICE  IS  STTLL  CONTINUING  WITH MONITORING OF TH= SLUDGE FIELDS B;ING OOM? BY OHIO EPft.

-------
C6AUG87
CITY
   AS PPEDICTiD TC BETTER  THAN  PREDICTED
            RIVER BASIN)
     GRANTED
                                                         COUNTY
                                                              ST RIVER BASIN
                                                                                      NEPA(YR)
RIDGEVILLE  CORNERS    HrMRY  COUNTY
-------
06AUC87
AS PREDICTED TO BETTER THAN PREDICTED
     COY RIVEP BASIN)
                                                                             ST RIVER BASIN
                                                                                 NEP»CTR)
CITY                 GP ANTS'.                             COUNTY
                APPLICATION IS UNDER  THE  DIRECTION  OF  A STATE PROGRAM.
 MORE FINDINGS:  ISSUE NUT  ADEQUATELY  ADDRESSED  ALTHOUGH THSRE is NO PROBLEM.LAND APPLICATION AND LANOFILLING OF SLUDGE
EANGOR               tANGOP.VILLAGE OF                  LACROSSE             MI UPPER MISSISSIPPI   1978      3*3
 ISSUE:         SOLID WASTE/SLUDGE
 PREDICTION:     DRIED SLUDGE COULD BE STOCKPILED ON TH? SITE AND PICKED UP BY AREA FARMERS FOR use on THEIR FIELDS
 FINDINGS:      SLUDGE is WASTED TMICE PER WEEK, FARMER WITH APPROVED FIELD APPLIES IT MET.
                PRYING 8EOS USED ONLY OCCASIONALLY MHEN SLUDGE SPREADING IS IMPOSSIBLE.

 MORE FINDINGS: SLUDGE SPREAD AS EXPECTED, BUT NOT USUALLY DPI50 FTRST



BARRON               EARRON.CITY OF                     BARRON               MI UPP5R MISSISSIPPI   1980      344
 ISSUE:         SOLID MAST'S/SLUDGE
 PREDICTION:     SLUDGE REMOVAL ONCE EVERY FEM YEARS
 FINDINGS?      NO SLUDGE DISPOSAL AFTER 3 YEARS OF OPERATION.


 MORC FINDINGS: IMPACT COPPFCTION PREDICTED



eiRCHHOOD      '      PIRCHHOIU.VILLAGH OF       -j       WASHBUPN             MI UPPER MISSISSIPPI   198Z      3*5
 ISSUE:         SOLID HASTE/SLUDGE
 PREDICTION:
 FINDINGS:      PLANT MILL OXIDIZE MOST SLUDGE IN THE AERATION LAGOON. PERIODICALLY SLUDGE MUST  BE REMOVED.NONE YET.
                SEcPASE C-LLS WILL REOUIRL.P?RI20IC REMOVAL OP GPOMTH AND SLUDGE.

 HORE FINDINGS: LITTLE EXCESS SLUDGE TO B= GENERATED.



BRUC1:                BPUC£,VILLAGE OF                   PUSK                 MI UPPER MISSISSIPPI   1985      3*6
 ISSUE:         SOLID HAST5/SLUDG3
 PREDICTION:
 FINDINGS:      SMALL AHOUNT CF SLUOGE ACCUMULATION IN AERATION CELLS HAS NOT NEEDED TO BE REMOVED.


 MORE FINDINGS: SLUDGE DISPOSAL HAS NOT BEEN NECESSARY



BUTTERNUT            UUTTtPtlUT.VILLAGE OF               ASHLAND              MI UPPER MISSISSIPPI   1981      347
 ISSUE:         SOLID HASTE/SLUDGE
 PREDICTION:     SLUDGE REMOVAL AND DISPOSAL MOULD NOT »E ROUTINELY REQUIRED
 FINDINGS:      SLUDGE HAS HOT BEEN REMOVED FROM PONDS. IT IS ANAEROBICALLY DIGESTED IN THE PONDS


 MORE FINDINGS: NO SLUDGE REMOVAL AND DISPOSAL


^«* ^ ^ ^«fc •• w ^ «• •» • ^^ ^ 4^ ^ ^ t^ ^ ^ •• ^ ^ «V ^ «• ^ ^^ ^ ^ ^^m ^«* «••• «B^ *» ^ ^ ^«» «• •» ^ ^^ «• ^ ••^•^ C3 ^»^» W ^ V3»0n <9^l^ ^B ^ QBO40 «• W ^ ^ ^ *»^»*» ^ •• ^^D ^^^flB ^ ^ m ^f K»^k^9 o» fp Vt) ^ ^» to ^fl»«A^
CORNELL              CORNELL,CIT-Y OF                    CHIPPEMA             MI UPPER MISSISSIPPI   i960      348

-------
06AUGB7
CITY
 ISSUE:
 PREDICTION:
 FINDINGS:
                   AS PREDICTED TO BFTTER THAN PREDICTED
                        (BY RIVER BASIN)
                                                                              ST  RIVER BASIN
                                                                                                     NEPA(YR)
     GRANTEU                            COUNTY
SOLID WASTE

SLUDGE HAULLO IN LIQUID FORM TO NEARBY FARMLAND FOR  SPREAOING.POSITIVE  SECONDARY  IMPACTS  OF  NUTRIENTS.
TWO FARMS WITH SEVEN FIELDS ARE USED FOR SURFACE APPLICATION.  1984-141,900  GALLONS  APPLIED.
TH= SLUDG; APPLICATION PROGRAM HAS INCREASED THE PRODUCTIVITY  OF  ANIMAL  FEED CROPS.
 MOR? FINDINGS: SLUDGE is DISPOSED  OF  BY  LAND  APPLICATION  ON  LOCAL  AGRICULTURAL  LAND.EXHIBITS GOOD NUTRIENT VALUE
CUMBERLAND
 ISSUE:
 PREDICTION:
 FINDINGS:
     CUMBERLAND,CITY OF
SOLIO WASTF
SLUDGc APPLICATIONS ON FARM LAMO
IN 198*. PLANT DISPOSED OF 719,OJC GAL
                                                        BARRON
                                                             UI UPPER  MISSISSIPPI
                                                                                                     1978
                                                                                              3*9
                                                      °F SLUDGE  ON  350  AC.  SLUDGE  ANALYSIS  PRESENTED IN SUMMARY REPORT
 MORE FINDINGS: SLUDGE BEING DISPOSED  OF  ON LAND
                                                        VCRNON/CRAWFORD.
                                                                              WI  UPPER  MISSISSIPPI    1978
                                                                                              350
DE SOTO              DESOTT,VILLAGE  OF
 ISSUE:         SQLIO WAST"
 PREOICTION:    IT MAT BECOME  NK-SSARY TO  FIND  A  SLUDGE  DISPOSAL  SITE...EITHER  AGRICULTURAL LAND  OR  PUBLIC LANDFILL
 FINDINGS:      ALL SLUDGc  IS  SPREAD ON 1 ACRE PER  YEAR,  ON  1  FARM WITH  40  ACRES  APPROVED SLUDGE  SITE.
 MORE FINDINGS:* SLUDGE WAS LANIFILLEO  UNTIL  ISBJ -WHEN o=  SQTO  SLUDGE  SITE  WAS  APPROVED  (VILLAGE LANDFILL  WAS CLOSED)
PHILLIPS
 ISSUE:
 PREDICTION:
 FINDINGS:
                                                        PRICE
                                                             WI UPPER MISSISSIPPI
                     PHILLIPS,CITY OF
                SOLIO WAST-!
                SLUDGE DISPOSAL WILL BE ON  EXISTING AG'IC. LANDS.  IMPACTS  TO  BE  MINIMAL
                SLUDGE IS DISPOSED ON  65 ACRES OF FAPM LAND. CROPS  OF  CORN,HAY  AND  ALFALFA  ARE  GROWN.
                SLUDGC DISPOSAL RATd BASFO  ON NITROGEN AND MFTALS  CONTENT.
                SLUDGE ANALYSIS P:RFORM=O ANNUALLY, no MAJOR CHANGC  IN METALS o*  NITROGEN  SINCE 1981.
                                                                                     1980
 MOPE FINDINGS: SLUDGE DISPOSAL  HAS  MINIMAL  IMPACTS
351
PLUM CITY
 ISSUE:
 PREDICTION:
 FINDINGS:
                     PLUM CITf,VILLAGE OF
                SOLID WASTE
                                        PIERCE
                                                                              WI  UPPER  MISSISSIPPI    1979
                                                                                              352
                LOCAL FARMERS 4AUL THE SLUOG5 FOR $50 PER  3,000  GAL.THEY  INJECT  IT  INTO CROPLAND  AS  A  CONDITIONER.
                THE PR^j=NT PL4NT GENERATES OVtP 50 PERCENT MORE  SLUDGE.
                TOTAL SOLIDS = 2.2t, TTL N = 3.9T, AMMONIA N = .54?,  TTL  P  =  1.5X,  TTL K  =  .26*,  PH  =  6.7
 MORE FINDINGS: THE PRESENT FACILITY  HANDLES  SLUDGE MO
-------
 06AUG67
     AS PREDICTED TO BETTER THAN PREDICTED
          (BY RIVER BASI»O
                                                        COUNTY
                                                               ST RIVER  BASIN
                                                                                     NEPACYR)
 STPUM
  ISSUE:
  PREDICTION:
  FINDINGS:
                                                        TREMPEALEAU
                                                               WI UPPER MISSISSIPPI    1980
     STRUM.VILLAGE OF
SOLID HASTE
DIGESTED SLUDGE WILL BE DISPOSED OF ON SUITABLE LAND APPLICATION  SITES
PRESENTLY,  THE CITY PAYS LOCAL FARMERS t2Q PER 31000 GALLONS  TO REMOVE  THE  SLUDGE.
SLUDG3 IS SURFACE APPLIED TO ANIMAL FEED CROPS.
THERE HAS BEEN SOME REDUCTION IN FERTILIZER USE AS A RESULT OF LAND  APPLICATION.
  MORE  FINDINGS: AS 'PREDICTED, SLUDGE is LAND-APPLIED TO CROPLAND
                                                                                              354
 ST. LOUIS
  J55UE:
  PREDICTION:
  FINDINGS:
 MORE FINDINGS:
                                                        GRATIOT
       ST.  LOUIS,  CITY OF
  SOLID WASTe
  uoc  TONS PER DAY OF SLUDGE MILL BE LANOFILLED.
  TWUVE  ADDITIONAL SLUDGE BEDS W£RE CONSTRUCTED DURING EXPANSION; HOWEVER,
  THE  SLUDGE IS NCW LAND APPLIED.   BEDS NOT USED.
                                                             MI  SAGINAW  RIVER  BASIN  1976
                                                                                              355
CASS
 ISSUE:
 PREDICTION:
 FINDINGS:
       SACINAW COUNTY WTP
                                        TUSCOLA
                                                              MI  SAGINAM RIVER BASIN 1977
356
:  SOLID  WASTE
  SLUDGE DISPOSAL IS INJECTED INTO PRIVATc AGRICULTURAL LANDS.
 MORE FINDINGS:
OURANO
 ISSUE:
 PREDICTION:
 FINDINGS:
                                          SHlflUflSSFC
                                                             MI SAGINAU RIVER  BASIN 1976
     l/URAf)D,C: TY OF
SOLIO WASTE
POSSIPLE CONTAMINATION TO GROUNDWATfcR 6  ACCUMULATICN  OF  METALS  DUE  TO LAND APP.
SLUDEGE IS NOW LANC APPLIED INSTEAD OF LANOFTLLEO  AS  WAS  PRACTICED
PRIOR TO UPGRADE OF PLANT.
357
 MORE FINDINGS:  SLUDGE is NOW LAND APPLIED VIA INJECTION TO FARMLAND.  WAS  LANDFILLEO  PREVIOUSLY

                MONITORING SHOWS NO IMPACTS TO GROUNOWAT^R OR  SOTL.
TITTABAWASSEE TUP    TITTABAWASSEE TWP WWTP
 ISSUE:         SOLID WAST?
 PREDICTION:     NO IMPBCT SHOULD OCCUR.
 FINDINGS:       NO IMPACT FOUND.
                                          SAGINAW
                                                             MI  SAGINAU RIVER  BASIN  1979
                                                                                              358
 MORE FINDINGS:
ADA
 ISSUE:
 PREDICTION?
       ADA  S6W1GE TREATMENT PLANT
  =N=RGY
                                        HMF0IN
                                                              OH MAUMEE  RIVER BASIN  1976
359

-------
06AUG87            AS  PREDICTED  TO  SETTER  THAN  PREDICTED
                        (BY  RIVER BASIN)

CITY                 GRANTEE                            COUNTY
 FINDINGS:       EL:CTRIC osr:  is  «Ti,496KWH  PSR  YEAR  a  «i6,595.63.
ST RIVER BASIN
NEPA(YR)
 MORE FINDINGS:  NO PREDICTION  WAS  HADE  ABOUT  ELECTRIC  USE.  THE  INCREASE  WAS  NOT SIGNIFICANT  ACCORDING TO THE  CITT.
CRIC^RSWILLE          CRIOcRSVILLE.VItLAGE OF             AUGLIAIZE             OH NAUHEE  RIVER  BASIN  1977     360
 ISSUE:          ENERGY
 PREDICTION:
•FINDINGS:       POWER USACF  PROPPED  BY  1/3  FROM OLD  PLAUT


 MORE FINDINGS:  POWER USAGE  1/3  L=SS THAN THAT OF  OLD  PLANT



NAPOLEON              NAPOLFCN                            HENRY                 OH NAUMEE  RIVER  BASIN  1977     361
 ISSUE:          ENfRGV
 PREDICTION:
 FINDINGS:


 MORE FINDINGS:  NO  IMPACTS  k-n.iRoiNG SNHPGY COMCCRNS w^pr  TDENTIFIFO  DURING  THE SITE  VISIT.



TOLEOC                TDLtOn-WALBPICGE                    WOOD                  CH MAUMEE  RIVSR  BASIN  1983     362
 ISSUE:          Ffi = kGY
 PREDICTION:     THE  PFOPOSFD PROJECT REQUIRES NC ENERGY  RESOURCES
 FINDINGS:


 MORF FINDINGS:  NO  tutPGY R^SOUPC.J  HAVE ?EEN IMPACTED DUE TO  THE  CONSTRUCTION  PROJECT.



RUSHFOPD              RUSHFO^O.CITY 3F                    FILLMORE              MN UPPER MISSISSIPPI    198j     363
 ISSUE:          ENKPGY
 PREDICTION:     ENERGY  IMPACTS INCLUDE  CONSUMPTION OF  FUEL DURING  CONSTRUCTION
 FINDINGS:       CITY  ASHIMISTRSTOR SAYS PLANT USES ABOUT SAME  AMT  OF  POWER  AS EXPECTED.
                 NATURAL  GAS  BACKUP GENERATOR  TESTcO  OHCc/Wf.  6UT  ACTUALLY  USED ONLY  IN 2 VRS OF PLANT OPERATION.

 MORE FINDINGS:  £MDRGY  use CJV;?ALL ABOUT AS PREDICTED.



ALMA                 BLMI MUNICIPAL  WASTEWATER TPMT  PLT  BUFFALO               wi UPPER MISSISSIPPI    1983     36*
 ISSUE:          ENERGY
 PREDICTION:     THE  USE  OF CHEMICALS AND ENERGY BY THE PLANT WILL  HOT  AFFECT THE RESOURCES OF THESE  MATERIALS.
 FINDINGS:       ENERGY  AND CHEMICALS A»t: UScD FOR  NORMAL PLANT OPfcRATION.
  MORE FINDINGS: THERE HAS BEFM NO  IMPACT  TO  ENERGY  OR  CHEMICAL  RESOURCES.

-------
P6AUG87            AS PREDICTED  TO  BETTER THAN PREDICTED
                            91V£R BASIN)
CITY                  GRANTEE                            COUNTY                ST  RIVER  BASIN          NEPA(VR)
^^* ** ^ "»^» •» A OB ^ ^ ^ ^»^h ^        M ^ M ^ ^ ^ A ^ ^^ ^ •• ^^ ^^ ^ ^^ ^^^ ^ ^ ^** *• ^ • W^V W «*^ *• tt O» ^ ^ «H*^ W ^ ^^ ^ ^ • ^ ^ 4H^ ^^ ^ ^^B ^^H^^» «»^^ ^B ^ ^ ^ ^W ^* ^ ^ ^* "* ^ ^^fc^
BANGOR                eAflGQR, VILLAGE OF                  LACROSSE              HI  UPPER  MISSISSIPPI    197fl      365
 ISSUE:          :(I,;RGY
 PPEDICTIONS     SOME  INC9EAS? IN FUiL t POMER COSTS FOR CONSTRUCTON £ OPERATION
 FINDINGS:       NOV  198<.-OCT 1 3 95 ELECTRICITY BILL FOR  PLANT WAS  «2343t AT $2.71  NET/KMH  t $5.50 NET  PER KW  DEMAND.
                 ENERGY USi :S LESS THAN EXPECTEO.

 MORE FiriOlNGS:  ENERGY USE IS LESS THAN PREDICTED



BUTTcRNUT             r»UTTr RIIUTt V ILLAGE OF               ASHLAND               MI  UPPER  MISSISSIPPI    1981      366
 ISSUE:          5MCRGY
 PREDICTION:     EU^RGY PEQUIREHSNTS WILL INCREASE
 FINDINGS:       TWO  LIFT  STATIONS IN USE.  NEW ^NO STATION LIFTS TPiATcD HW  TO SEEPAGE CCLLS FROM STAB. PONDS.


 MORE FINDINGS:  2  PUMP STATIONS IN use AS PREDICTED



FOUNTAIN CITY         FOUNTAIN CITY, CITY OF              BUFFALO               MI  UPPER  MISSISSIPPI    1979      367
 ISSUES          'HERGV
 PREDICTION:
 FINDINGS:     .  GAS  BURNER RECYCLES METHANE FROM SLUDGE DIGESTER. SAVE $5000-93200 ON OIL. THEREFORE FUEL CONSUMP CUT,
                                                 •'
                                                 i>
 MORE FINDINGS:  MO PREDICTION MAD^.



PLUM CITY             PLUH CITY, VILLAGE OF               PIERCE                MI  UPPER  MISSISSIPPI    1979      368
 ISSUE:          ENERGY
 PREDICTION:
 FINDINGS:       EN:RGY AND CHEMICALS APE USED t'4 TH^ ROUTINE OPERATION OF THE PLANT.
 HOKC FINDINGS:  THF  ISSUE OF  ENERGY MAS NOT ADDRESSED IN THE FACILITIES PLAN; NO APPARANT  PROBLEM NOW.
                 ENERGY USED DURING NORMAL PLANT OPERATIONS D05S NOT  AFFECT  THE  RESOURCES OF  THESE MATERIALS.

^* ^m ^ ^ ^ ^* ** ^ *^ ^ ^ ^ ** ** "* ^ ^m ** ^ ^ ^ ^ ** ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ *^ *• ^ *V *v ^» «V ^ ^ ^ ^v -^ ^ «V •* ^ 4V ^v ^B •• A W ^ ^ ^V ^ •• «• ^ ^ ^* «^ ^» ^ ^V ^* ^ ^»^V ^V ^ ^V ^V V «» M» ^* ^ ^ ^ ^* •* ^ ^* ^* ^ ^ ^ ^ •*
STRUM                STRUM, VILLAGE OF                   TREHPEALEAU          Ml UPPER MISSISSIPPI   1980      369
 ISSUE:          ENFRGY
 PREDICTION:
 FINDINGS:       THE PLANT WAS CONSTRUCTED TQ T/VRE ADVANTAGE OF. GRAVITY FLOWS.
                 IN ADDITION)  METHANE GAS PRODUCED BY THE DIGESTER PROVIDES  40*  OF THE PLANTS FUEL.

 MORE FINDINGS:  THERE HAS BEEN NO IMPACT TO ENERGY OP CHEMICAL RESOURCES AS A RESULT OF NORMAL PLANT OPERATION.



CASS                 SAGINAM  COUNTY MTP                 TUSCOLA              HI SAGINAM RIVER BASIN 1977      370
 ISSUES          EfiSRGY
 PREDICTION:
 FINDINGS:       SAVINGS HAVE  RESULTED FROM THE LAND INJECTION OF SLUDGE MHEN
                 COMPARED TO LANDFILL ALTERNATIVES.

-------
C6AUG87



CITY

 MORS  FINDINGS:
AS PREDICTED 'TO 3FTTER THAN PREDICTED
     Cl'T RIVER 6ASIN)


  GRANT?;                            COUNTY
ST RIVER BASIN
                       NEPACYR)
DURAMO                DURANO.CITY OF                      SHIAUASSEE            MI  SAGINAM  RIVER  BASIN  1976      371
 ISSUE!          ENERGY
 PREDICTION:
 FltlOIMGS:       ENCRGY  USAGE HAS BEEN  REDUCED  SINCE THE  SLUDGE  CONDITIONING  UNIT  HAS  NOT BEEN  IN
                 US'.

 MORE FINDINGS:



FORT UAYNE            FOU  W«VN?,CITY OF          ALLEN                 IN  MAUMEE RIVER BASIN   1980      372
 ISSUE:          AIR  QUALITY
 PREDICTION:     AIP  QUALITY  SHOULD NOT BE ADVERSELY AFFECTHD BY  THIS  PROJECT EXCEPT FOR  SHORT  TERM NOISE  AND  DUST.
 FINDINGS:       NO ADVERSE AIR  DUALITY EXISTS  OuE TO CONSTRUCTION.DUST  REDUCTION  CHEMICALS  WERE USED TO KEEP  OUST OUT


 MOPE FINDINGS:  OUST  CONTROL MEASURES  WER.= FMPLJVED DURING CONSTRUCTION. NO  AIR  QUALITY  PROBLEMS  EXIST.



MONROEVI1L?           MDNSOFVILLHtSUG DISPOSAL  AUtM       ALLEN                 IN  MAUMEE RIVER BASIN   1980      373
 ISSUE:          AIR  QUALITY
 PREDICTION:     MITIGATING CONTROL MEASURES INCLUDE OOOR CONTROL
 FINDINGS:       NO AIR  DUALITY  CHANGES HAV? HAPPENED SINCE THE CONSTRUCTION.


 MORE FINDINGS:  OUST  WAS CONTR1LLOED THROUGH PROMPT RESEEOING  .AIR QUALITY HAS NOT BEEN  A PROBLEM SINCE CONSTRUCTION M
                 »S bEGUfl


CRIDER3VILLc          C" I 0?(>3V ILLF , V ILL AGE CF             AUGLIAIZE             OH  MAUMEE RIVER BASIN   1977      374
 ISSUE:          AI9  QUALITY
 PREDICTION:     NO OOOP  p«r>3Ljns AR- EXPECTED
 FINDINGS:       ODOR  PROBLEMS  ONLY WHEN PLANT  n SHUT DOWN TO  PREVENT SOLIDS LOSS.


 MOR= FINDINGS:  ODOR  PROBLEMS  ONLY IF  PLANT is SHUT DOWN.


• ^•— ——•••————•-•— — — — —•• — ——»—————*—-• «-— —— — ——— — •—••——••—•.— « .*.«..*«« .A._.....«VM.V. ~MM* •_ _«•.»».«•«•—•-———— — • •»-• —
HARROO                H4RROn,VILL4G? OF                   ALLEN                 OH  MAUMEE RIVER BASIN   1977      375
 ISSUE:          AIR  QUALITY
 PREDICTION:     ODORS FROM SEPTIC TANK OISCHARG= SHOULD  a= ELIMINATED.
 FIHOIN&S:       NO ooo^s FPOM  PLANT OR STREAM.


 MORE FINDINGS:  NO ODORS PRSSZNT



KALIDA                KALIDA,VILLAGE OF                   PUTNAM                OH  MAUMEE RIVER BASIN   1976      376

-------
06AUG87
CITY
 ISSUE:
 PREDICTION:
 FINDINGS:
   AS PREDICTED TO BETTER THAN PREDICTED
        (BY RIVER BASIN)
                                        COUNTY                ST  RIVER  BASIN



NO AIR QUALITY PROBLEMS NOTED FROM ANY SOURCE.  MO  ODORS  NOTED.
     GRANTEE
AIR QUALITY
                       NEPAtYR)
 MORE FINDINGS: NO IMPACTS ON AIR QUALITY MERE EXPECTED AND NONE OCCURRED.
MONTPELIER
 ISSUE:
 PREDICTION:
 FINDINGS:
                                        WILLIAMS
                                                              OH  MAUMEE  RIVER  BASIN   1980
                                37T
     MONTPELIER SUG TRT PLT
AIR QUALITY
OOORS ASSOC U/OUMP STATIONS UILL Pt MINIMIZED BY PROPER LOCATION, DESIGN,  I MAINTENANCE  OF  FACILITIES
THERE ARE NO ODOR PROBLEMS ASSOCIATED WITH THE PUMP STATION OR THE REST OF THE FACILITY.
 MORE FINDINGS: AS NO ODOR PROBLEM EXISTS, THIS is NOT AN  ISSUE
NAPOLEON
 ISSUE:
 PREDICTION:
 FINDINGS:
     NAPOLEON
*IR QUALITY
                                        HENRY
OH MAUHEE RIVER BASIN  197T
                                                                                              378
AIR QUALITY WAS NUT A CONCERN TO BE CONSIDERED DURING  PROJECT
CONSTRUCTION.  THERE APPEARS TO BE NO ADVERSE IMPACTS  ON LOCAL  AIR  QUALITY.
 MORE FINDINGS: AIR QUALITY WAS NOT AN ISSUE TO BE CONSIDERED  DURING  PROJECT CONSTRUCTION.THERE  APPEAR TO BE NO
                ADVERSc IMPACTS ON LOCAL AIR QUALITY.
RIOGEVILLE CORNERS   HENRY COUNTY(RIOGEVILLE CORNERS)   HENRY
                                                              OH  MAUMEE  RIVER  BASIN  1976
                                                                                              379
 ISSUE:          AIR QUALITY
 PREDICTION:    ADVERSE EFFECTS FROM TH= FACILITY TO AMBIENT  AIR WOULD  BE  NEGLIGIBLE^  ODORS  WOULD BE MINIMAL)
 FINDINGS:      THERE ARE NO ODOR PROBLEMS ASSOCIATED WITH THE FACILITY.
                THERE ARE NO OTHER ADVERSE EFFECTS WITHIN THE PLANNING  AREA  EXHIBITED DUE  TO  THE  FACILITY.

 MORE FINDINGS: PREDICTION WAS ACCURATF.
TOLEDO
 ISSUE:
 PREDICTION:
 FINDINGS:
     TOL?DO-WAL8RinGE
AIR QUALITY
                                        WOOD                  OH MAUMEE  RIVER  BASIN   1980



AIR QUALITY IS MONITORED BY THE STATE OF OHIO AND  IS CONSIDERED GOOD.
                                •MO
 MORE FINDINGS:
TOLEDO
  ISSUE:
  PREDICTION;
  FINDINGS:
     TOLEDO,CITY OF (TFN MILE CRcEK)
AIR QUALITY
INCREASE IN AIR POLLUTION (SHORT TERM)
NO IMPACT APPARENT.
                                        LUCAS
OH HAUMEE RIVER BASIN  1977
                                                                                              381
  MORE  FINDINGS:  AIR POLLUTION CONCFcjigs WERE A  SHORT TERM  IMPACT.NO  EXISTING  AIR  POLLUTION  PROBLEMS HAVE BFEN

-------
06AUG87            AS PREDICTED TO BETTER THAN PREDICTED
                        CSV RIVER BASIN)

CITY                 GRANTEE                            COUNTY               ST RIVER BASIN         NEPA(YR)
                ASSOCIATED WITH THE CONSTRUCTION PROJECT

•»••»«••*«•««•_*••»«»_ _*«•«•_* WM ««••»*••— »•» — — -•*•«•• —-•——•••— «»•»•»••••••» WM A • •••••••» ••»—••••• «•««••••« «»•<• _«»«»•»•*
TOLEDO               TOLEDO, CITY OF            LUCAS                OH MAUMEE RIVER BASIN  1980     382
 ISSUE:         AIR QUALITY
 PREDICTION:    AIR QUALITY SHOULD NOT BE IMPACTED BY THE PROPOSED PROJECT
 FINDINGS:      AIP QUALITY IN TOLEDO HAS NOT IMPROVED DRAMATICALLY. PLANT UPGRADES HAVE REDUCED LOCAL ODOR EMISSIONS.


 MOKE FINDINGS: PLANT UPGRADES HAVE NOT AFFECTED THE AMBIENT AIR QUALITY FOR THE CITY OF TOLEDO.



UNIOPOLIS            UNIOPOLI5, VILLAGE OF               AUGLAIZE             OH MAUMEE RIVER BASIN  1977     383
 ISSUE:         4IR OUftLlTY
 PREDICTION:    ELIMINATE ODOR PROBLEMS ASSOCIATED WITH SEPTIC TANKS.  NO OTHER AIR QUALITY IMPACTS ARE EXPECTED.
 FINDINGS:      no ODOR PROBLEMS sxpERitNceo FPOM NEW PLANT.


 MORE FINDINGS: NO DOOR PPOEL^S.



WESTON        .       WrSTQN, VILLAGE OF                  WOOD                 OH MAUMEE RIVER BASIN  1979     364
 ISSUE:        :  «:R QUALITY
 PREDICTION:    OUST WILL occuc DURING CONSTRUCTION.
 FINDINGS:      OPERATOR STATED NO IMPACT.


 MORE FINDINGS: DUST was A PPQSLFM WITH THE INSTALLATION OF SOME CF THE SEWER LINES IN THE COMMUNITY.
                THIS wts A $HOPT-T?RM CONSTRUCTION RELATED PERTURBATION, NOT AN ONGOING PROBLEM.


ROCHESTER            pccHesTER.ciTv OF                  OLMSTEO              MM UPPER MISSISSIPPI   197R     335
 ISSUE:          AIR QUALITY
 PRLDICTION:
 FINDINGS:      AIR IN PLANT PASSED THROUGH EITHER W?T OR DRY SCRUBBERS YIELDING
                FEWtR ODOR COMPLAINTS FROM THE SURROUNDING PROPERTY OWNERS.

 MORE FINDINGS:



RUSHFOPO             RUSHFOKD.CITV OF                   FILLMORE             MN UPPER MISSISSIPPI   1980     386
 ISSUE:          AIR QUALITY
 PREDICTION:    CHANGE WILL BE POSITIVE WITH REMOVAL OF ANAEROBIC OIG£STION AND ... PERIODIC OFFENSIVE ODORS
 FINDINGS:      NO UNPLEASANT ODORS FROM NEW FACILITY EVEN TO CLOSEST NEIGHBORS. SLUDGE TANKS COVERED.


 MORE FINDINGS:  IMPACT ELIMINATION OF UNPLEASANT ODORS FROM OLO PLANT AS EXPECTED » NO OUST COMPLAINTS IN CONSTRUCTION
                     ALMA MUNICIPAL WASTEWITER TRMT PLT BUFFALO              wi UPPER MISSISSIPPI   i960     387
                AIR  QUALITY
 PREDICTION:    THERE HILL 3£ MINIMAL IMPACT TO AIR QUALITY.

-------
06AUC.8T
 CITY
  FINDINGS:
   AS P?EOICT£0 TO BETTER THAU PREDICTED
        cer RIVCR BASIN)


     GPANTEc                            COUNTY
                                                                              ST RIVER BASIN
                       NEPACYR)
  MORE  FINDINGS: AS PREDICTED, MINIMAL  IMPACT  TO  AIR  QUALITY  OCCURRPO.
                                                         EAU  CLAIRE
                                                              MI  UPPER  MISSISSIPPI    1977
                                388
AUGUSTA               AUGUSTA,CITY  OF
 ISSUE:          AIR  QUALITY
 PREDICTION:     NO ODOR  PROBLEMS WILL RESULT AS LONG AS TREATMENT FACILITIES ARE PROPERLY OPERATED AND MAINTAINED.
 FINDINGS:       NO OPOR  COMPLAINTS HAVE BEEN RECEIVED.NO ODOP.S PERCEIVED DURING PLANT VISIT.
 MORE FINDINGS: AIR QUALITY HAS NOT  BEEN  A  PROBLEM  AT  THIS  PLANT.
BANGOP
 ISSUE:
 PREDICTION:
 FINDINGS:
                                         LACROSSE
WI UPPER MISSISSIPPI
                                                                                                    1978
                                                                                                              389
     BANGOR,VILLAGE OF
AIR QUALITY
MECHNICAL SCWAGE TREATMENT FACILITY  DOES NOT CRcATF ODOR PROBLEMS...DUST  FROM  CONSTRUCTION  CONTROLLED
NO ODOR PROBLEM. NO OUST PROBLEM DURING CONST  SINCE SITE MAS  MET  t  COVERED  MITH STRAM  ON  SLOPE.
NO BURNING NECESSARY t SLUDGE NOT USUALLY DRIED ON SIT? IN  WARM.
 MORE FINDINGS:. NO AIR QUALITY PROBLEMS  MITH  NEW  PLANT
BARRON
 ISSUE:
 PREDICTION:
 FINDINGS:
                TURK3Y FARM ADJACENT TO PLANT,  HO  NEARBY  RESIDENCES.

 MORE FINDINGS: SOME OOORS BUT LITTLE  IMPACT  DUL TO  LOCATION.
                     BARRON,CITY OF                      BARRON
                AIR QUALITY

                PLANT 0009 MAY BE OCCASIONAL  PROBLEM
                         CONTINUOUS  ODORS  F°OM  INFLUENT  CHAMBER.
                                                              MI  UPPER  MISSISSIPPI
                       1980
                                                                                                              390
BIRCHMOOO
 ISSUE:
 PREDICTION:
 FINDINGS:
     BIRCHML.OD,VILLAGE OF               MASH3URN

AIR QUALITY
OOORS HILL NOT DEVELOP WHEN PLANT PROPERLY OPERATED.
NO SERIOUS ODORS NOTICED BY OPF3ATOR! N3 COMPLAINTS.
MI UPPER MISSISSIPPI
                                                                                                    1982
                                                                                                              391
 MORE FINDINGS: NO SCRIOUS ODORS.
BRUCE
 ISSUE:
 PREDICTION:
 FINDINGS:
                                                         RUSK
                                                              MI  UPP5R  MISSISSIPPI
                       1980
                                                                                                             392
                     BRUC=,VILLAGc OF
                AIR QUALITY
                SLIGHT INCRtAiE  IN DUST DURING  CONSTRUCTION  MILL  3=  MINIMAL  AND  SHORT-TERM POTENTIAL FOR ODORS IS LOW
                NO KNOWN AIR QUALITY  PROSLEMS' REPORTED,NO  NOTICEABLE  OOORS.
                NO AIR QUALITY DATA AVAILABLE.
 MORE FINDINGS: no NOTICEABLE ODORS.  OUST  PROBLEMS  MERE  SHORT-TEPM

-------
06AUG87
CITt
                    AS PREDICTED TO BETTER  THAN PREDICTED

                         (BY RIVER BASIN)
                      GRANTS
                                        COUNTY


                                        ASHLAND
                                                            ST RIVER BASIN


                                                            MI UPPER MISSISSIPPI
                                                                                    NEPA(VR)


                                                                                    1981     393
BUTTERNUT
  ISSUE:
  PREDICTION:
      BUTTERNUT,VILLAGE  OF

      1U4LITY
      4TICIPATEO I*

 NO ODORS NOTICED.
NO*ANTICIPATEO IMPACTS.  MINOR ODORS MAY BE EXPERIENCED DURING SPRINGTIME
 MORE  FINDINGS: NO ODORS NOTICED: NO COMPLAINTS  NOTED  LOCALLY
                                                        CHIPPEWA
                                                             UI UPPER  MISSISSIPPI
                                                                                    1980
                                                                                                              394
                      CORNELL,CITY OF
  ISSUE:          SIR QUALITY
  PREDICTION:    DEVELOPMENT WILL RESULT  IN  INCREASED TRAFFIC  AND THE  ASSOC  DECREASE  IN  AIR  QUAL ODORS  WILL BE MINIMIZE
  FINDINGS:      THERE is >n ODOR PROBLEM AND  THE OPERATOR  HAS  RECEIVED  NO COMPLAINTS.
                 TH!;RE HAS Bt=N NO GROWTH ASSOCIATED WITH THE  PLANT  AND  THUS NO  MORE  TRAFFIC TO  DEGRADE AIR QUALITY.


  MORH  FINDINGS: AIR QUALITY HAS«NT BEEN  DEGRADED AS PREDICTED.ODORS  HAVE BEEN MINIMIZED AT  THE  PLANT W/NO COMPLAINTS.
CUMBERLAND
 ISSUE:
 PREDICTION:
 FIND INGS:
 AIR
      CUMV;-L«NO,CITY  OP
                                        OARRON
                                                             WI UPPER MISSISSIPPI   1978
                                                                                             395
 OLD PLANT WAS  4BANOPNHD.NEW PLANT LOCATED IN RURAL AREA.NEW UNIT PROCESSES 00 NOT CAUSE STRONG  ODORS.
 MORE  FINDINGS: 3ETT=R SIT?,BETTER PLANT,FEWFR ODORS,BUT NO PREDICTION MADE
OE  SOTO
  ISSUE:
  PREDICTION:
  FINDINGS:
                                        VERHON/CRAWFORO
                                                            WI UPPER MISSISSIPPI
                                                                                    1978
396
     DCSOTO,VILLAGE  OF

AIR QUALITY

CONSTRUCTION...WILL  NOT  CREATE 300R PR3°LEMS. DUST...OURING CONST  WILL  BE  CONTROLLED  BY  WATER  SPRAT

NO REPORTED «IP QUALITY  OR  ODOR  PROBLEM. R8C  t  SLUDGE  UNITS ALL  COVERED.
 MORE  FINDINGS:  NO
FOUNTAIN  CITY
 ISSUE:
 PREDICTION:
 FINDINGS:
                                                             WI UPPER MISSISSIPPI    1979
                                                                                             397
     FOUNTAIN CITY,CITY OF               BUFFALO
AIR QUALITY

PROVIDING A 500FT BUFFER ZONE,STANDBY  POWER,COVERS  AND  BYPASSES WILL ALLEVIATE ANY ODOR PROBLEMS
NO PROBLEMS REPORTED WITH ODORS.BUFFER ZONE  DOES  EXIST.
 MORE FINDINGS:  NO  ODOR  PROBLEMS  REPORTED.
PLUM CITY
 ISSUE:
 PREDICTION:
 FINDINGS:
     PLUM CITY,VILLAGE OF

AI3 QUALITY

TH5R5 WILL d:  NJ IMPACT ON AIR QUALITY.
NO IMPACT TQ AIR QUALITY H*S OCCURRED.
                                       PIERCE
                                                             WI  UPPER MISSISSIPPI   1979
                                                                                             398
                                       THE PLANT DOES NOT HAVE AN ODOR PROBLEM.

-------
C6AU687



CITY

 MORE FINDINGS:
   AS PREDICTED TO BETTER THAN PREDICTED
        CJY RIVER BASIN)


     GPANT=£                            COUNTY
                                                                             ST  RIVER  BASIN
                       NEPA(VR)
SHELL LAKE
 ISSUE:
 PREDICTION
 FINDINGS:
                                        WASHBURN
                    SHELL LAKE,CITY OP
               AIR QUALITY
               SLIGHT INCREASE IN NOIS2.  NOISE AND ODOR WILL  NOT  CAUSE  DISCOMFORT.
               NOISE CONTROLLED BY SOUND PROOFING IN BLOWER  BUILDING.
               NO HOUSES CAN BE SEEN FROM SITE.
               OOOR NOT cV
MORE FINDINGS: NOISE AND ODOR NOT CAUSING DISCOMFORT.
               NO UNDO ODORS; NO COMPLAINTS.
MI UPPER MISSISSIPPI
                                                                                     1980
                                                                                              399
STRUM
 ISSUE:
 PREDICTION:
 FINDINGS:
     STRUM,VILLAGE OF
AIR QUALITY
                                                       TREMPEALEAU
HI UPPER MISSISSIPPI
                                                                                     1980
                                                                                              400
 MORE FINDINGS: NO IMPACT TG AIR QUALITY OCCURRED
WESTBY
 ISSUE:
 PREDICTION:
 FINDINGS:  ..
                                        Vil RNON
                                                                             WI  UPPER  MISSISSIPPI
                       19T9
                                                                                              401
     W-ST3Y S'iWAGi TREATMENT PL4NT
    QUALITY
NO ODOR FROM OPE RATION.BURNING DURING CONSTRUCTION  WILL  COMPLY  WITH AIR  POLLUTION REGS. CONTROL OUST.
NO ODOR NOP OUST PROBLEMS S£PORT=D DURING CONSTRUCTION.
FUGITIVE OUST  IN C^NST WAS ADEQUATELY CONTROLLED.
 MORE FINDINGS: NO AIR QUALITY PROBLEMS OR COMPLAINTS REPORTED  OR  NOTED.
CASS
 ISSUE:
 PREDICTION:
 FINDINGS:
     SAGIN4W COUNTY WTP
AIR QUALITY
                                                       TUSCOLA
THE PLAliT EXPANSION HAS NOT  RESULTED  IN  AtlY  AIR  QUALITY
                                                              MI  SAGINAH RIVER BASIN 1977
                                402
 MORF. FINDINGS:
HOLLY
 ISSUE:
 PREDICTION:
 FINDINGS:
                                         OAKLAND
                                                                             MI  SAGINAW RIVER BASIN 1977
     OAKLAND COUNTY OPW
AIR QUALITY
ODORS ASSOCIATED WITH WWTP CONTROLLED  BY  ENCLOSING  ODOR  PRODUCING SEGMENTS OF PLANT.
ODORS CONTROLLED AS PREDICTED.
                                 403
 MORE FINDINGS: NO NOTICABLE ODORS FROM PLANT. NO  COMPLAINTS  FROM  COMMUNITY WHICH is DIRECTLY ADJACENT TO PLANT.
 IAPEER
                     LAPEER.CITY OF
                                         LAPEER
                                                                             MI  SAGINAM RIVER BASIN 1976
                                                                                              404

-------
06AUG67
                   AS PREDICTED TO BETTER THAN PREDICTED
                        (BY RIVER BASIN)
CITY                  GRANTEE                             COUNTY
  ISSUE:          AIR  QUALITY
  PREDICTION:     NOISE  AND  ODORS  WILL BE  LOCALIZED AND MINIMIZED.
  FINDINGS:       NO  IDENTIFIABLE  NOISE OR ODOR  PROBLEMS EXIST.
                                                                              ST RIVER BASIN
                                                                                                     NEPA(YR)
  MORE  FINDINGS:
                                                         SAGINAU
TITTAEAWASSEE TMP    T ITTABAUASSEE TWP WMTP
 ISSUE:         AIR QUALITY
 PREDICTION:    ODORS WILL CONTINUE TO OCCUR, SIMILAR TO THOSE FOUND  IN PAST  YEARS.
 FINDINGS:      ODORS HAVE 6=tN ELIMINATED SINCE TM = PLANT EXPANSION.
                                                                              MI SAGINAU RIVER BASIN 1979
                                                     405
 MORE FINDINGS:
KALIDA
 ISSUE:
 PREDICTION:
 FINDINGS:
                     KALIDA,VILLAGE OF

                OTHEP/fECRrATION


                FIJHING OCCURS IN THE OTTOWA RIVER.
PUTNAM
                                                                              OH MAUMEE RIVER BASIN  1976
                                                                                              406
 MORE FINDINGS*  RECREATIONAL USES  HAVE  INCREASED.SLIGHTLY.
MONTPELIER
 ISSUE:
 PREDICTION:
 FINDINGS:
                                                        WILLIAMS
                     OH MAUMEE RIVER BASIN  1980
     MCUTPe_LIE7 SWG TRT PLT
3THER/-tCSEATION

RECREATION ARiAS IN THE FftClLITY PLANNING  AREA WILL NOT  BE  AFFECTED  BY  THE  PROPOSED  PROJECT.
RECREATION AP'iAS WECF NOT AF*=ECTFD BY PRCJtCT.
                                                                                                              407
 MORE FINDINGS:  PREDICTION  w»5  ACCURATE
UESTON
 ISSUE:
 PFEDICTION:
 FINDINGS:
                                                        WOOD
                     OH MAUDES RIVER BASIN  1979
     WESTON,VILLAGE OF
OTHEP/SECREATION

TH* PROJECT WILL NOT IMPACT SCENIC RIV'RS OR  RECREATIONAL  US=S.
PRESENT RHCO^OS INDICATE NO PFOELEMS WITH THE SCENIC  RIVERS  OR RECREATIONAL  AREAS.
                                                                                                              408
 MORE FINDINGS: PREDICTION  WAS  ACCURATE.
AUGUSTA
 ISSUE:
 PREDICTION:
 FINDINGS:
                     AUGUSTA,CITY OF

                OTHER/RECREATION
EAU CLAIRE
                                                              WI  UPPER  MISSISSIPPI    1977
                AESTHETICS AND RECREATION HAVE IMPROVED AS A RESULT OF DECREASED LOADINGS.
                                                     409
 WORE FINDINGS: RECREATION W»S NOT  ADDRESSED  AS  AN  ISSUE  BUT  HAS BEEN PERCEIVED TO HAVE IMPROVED BY LOCAL RESIDENTS,

-------
06AUG87
cm
                  AS PREDICTED TO BETTfcR THAN PREDICTED
                       (BY PIVEP BASIN)


                    GRANTEE                            COUNTY
ST RIVER BASIN
                                                                                                     NEPA(YR)
BRUCE
 ISSUE:
 PREDICTION:
 FINDINGS:
                                                       RUSK
                    BPUCE.VILLAGE OF
               OTHER/RECREATION
               NO AOVTPS- xMPACT ON EXISTING OR FUTURE RECREATIONAL  ACTIVITIES
               SITE HAS IMPACT ON UATER ACTIVITIES SUCH AS BOATING,  FISHING.
               NO RECREATIONAL SITES NEA8BY,EKCEPT RIVER.
UI UPPER MISSISSIPPI   1980
 MORE FINDINGS: NO NOTICEABLE  IMPACTS ON RECREATION
                                                                                                              410
CUMBERLAND
 ISSUE:
 PREDICTION:
 FINDINGS:
                    CUMBERLAND,CITY QP                 BAR30N
               OTHER/RECREATION
               TMPRaWFM=NT OF RCCREAT IONAL VALUE OF B=AVER DAM
               PLANT MOVED,NEU UNIT PROCESSES.ODOR NOT NOTICED.
               IMPROVED MATER QUALITY AT LAKE.
MORE FINDINGS: B-^TT;R
                          = ,f=;WER OOORS.NO DISCHARGE TO LAKE
UI UPPER MISSISSIPPI
                                                                                                     19TB
FOUNTAIN CITY .CITY OF
                                                        BUFFALO
                                                                             WI  UPPER  MISSISSIPPI    1979
                                412
FOUNTAIN CITY  .
 ISSUE:        i O
 PREDICTION:    MERRICK STAT; PAPK HILL NOT BE AFFECTED BY THH PROJECT, NOR  WILL  THE UPPER  MISS  FISH  t  WILDLIFE REFUGE.
 FINDINGS:      NO CHANGr FROM PREVIOUS CONDITIONS. STATE PARK BORDERS  ON WWTP  SITE. NO  COMPLAINTS  RECEIVED.
 MORE FINDINGS: NO PROBLEMS R=PO*TrD.NO CH»NGi TRQM PREVIOUS CONDITIONS.

-------
06AUG87
CITY

ROCHESTER
 ISSUE:
 PReOICTION:
 FINDINGS:
 MORE FINDINGS:
   PREDICTION  NOT  SUSTAINED
         
-------
06AUG87



CITY

 MOKE FINDINGS:
   PPEDICTIUN NOT SUSTAINED
        (BY RIVER BASIN)


     GRANTEt
                                        COUNTY
ST RIV6R BASIN
NEPA(VR)
CUMPERLAND
 ISSUE:
 PREDICTION:
 FINDINGS:
     CUMBERLAND,CITY OF
WETLANDS
                                                        BARRON
                                                             WI  UPPER  MISSISSIPPI
                       1978
         419
IMPACTS NOT LONG-TERM BUT CONSTRUCTION DTD OCCUR IN WETLAND.
 MORE FINDINGS:
STRUM                STRUM,VILLAGE OF                   TREMP6ALEAU          WI UPPER  MISSISSIPPI
 ISSUE:         FLOODPLAINS
 PREDICTION:    THE DIKES WILL NEED TO BE REPAIRED.
 FINDINGS:      THE DIKES HAV£ 8E£N REPAIRED.
                TH£ PLANT HAS 8EEN SUBJECT TO SPRING FLOODING AND PACKFLOW  THROUGH  THE  OUTFALL.

 MORE FINDINGS: THE FLOOD HAZARD WAS NOT COMPLETELY MITIGATED BY THE  REPAIR OF THE  DIKES
                                                                                     1980
                                                                                              420
MONROEVILLE
 ISSUE:
 PREDICTION:
 FINDINGS:
 MORE FINDINGS:
     HQN40EVILLE.SUG DISPOSAL AUTH
3IOTA/UR
                                        ALLEN
IN MAUMEE RIVER BASIN  1980
         421
DURING WASM WITHER THICK SWARMS OF MIDGE FLIES ENGULF AREA SURROUNDING LAGOON FORCING  BUSINESSES  TO c
TOWN MORE OR LESS HIRE UNATES.MIDGE FLI'S REPRODUCING IN BRIC-ft-BRAC AROUND NEW LAGOON.
DUCKS,GEESS, AND GREY HERRING INHABIT LAGOON DURING COLD WEATHER.THESE BIRDS WEREN'T HERE  BEFORE GRANT
VERY SERIOUS FBQ3LEM HAS ARISEN 95CAUS? OF CONSTRUCTION.MIDGE FLIES DURING WARM WEATHER FORCES  STORES
TO CLOSE,ACTIVITY IN TOWN TO DU AND cSTHICS OF TCMN TO OECREASE.TOWN UNABLE TO GET HELP FROM ANYBODY
TO HELP SOLVE PROBLEM.BIRDS IN LAGOOM IN WHITE? HAVE 9FEN NICE BUT ARE EXPECTED IN LAGOON  SYSTEMS.
BUTTERNUT
 ISSUE:
 PREDICTION:
 FINDINGS:
                                        ASrtLANO
     BUTTCRHUT,VILLAGE OF
8IOTA/TCR
MINIMUM IMPACT ON VEGETATION AND WILDLIFE

FORCE MAIN CONSTRUCTION ROUTE REQUIRED REMOVAL OF TREES.
CONSTRUCTION OF FH AND SEEPAGE CELLS CAUStD RELOCATION OF WILDLIFE.
WILDLIFE ARE RETURNING TO CONSTRUCTION AREA FOR WATER AND FOOD
WI UPPER MISSISSIPPI
1981
422
 MOPE FINDINGS: THE EA UNDERESTIMATES TEMPORARY IMPACTS OF CONSTRUCTION
MONROEVILLE
 ISSUE:
 PREDICTION:
 FINDINGS:
     MONROEVILLE.SWG DISPOSAL AUTH
SOCIO/SECO?V
                                        ALLEN
ECONOMICS III CITY HAVEN'T CHANGED SINCE CONSTRUCTION
IN MAUMEE RIVER BASIN  1980
                                                                                              423
  MORE  FINDINGS: ONLY DIFFEPCNCE is THAT CERTAIN SHOPOWNERS ARE FORCED  TO CLOSE  THEIR  SHOPS  WHEN  MIDGE  FLIES  GET HEAVY
 MONROEVILLE
                     MONROEVILLE,SWG DISPOSAL AUTH
                                        ALLEN
                                                              IN,MAUMEE  RIVER  BASIN   1980      424

-------
C6AUG87             PPEDICTION NOT SUSTAINED
                         (BY  RIVEP BASIN)

CITY                  GRANT?"
 ISSUE:          SOCIO/USERCHG
 PREDICTION:     ESTIMATED MONTHLY USER CHARGE:*6.oo
 FINDINGS:       AVERAGE USER CHARGE ABOUT M3.50
COUNTY
                     ST RIVER  BASIN
                                                                                     NEPACYR)
 MORE FINDINGS:  INCREASt  IN USER COSTS WERE ABOUT SGt HIGHER THAN PREDICTED.PREDICTED  $6  INCREASE  -  ACTUALLY  *9.00
                 PER  CAPITA INCOM?: LESS THAN (10,000 SO THIS INCREASE IS OVER IT OF THEIR  INCOME
ADA
 ISSUE:
 PREDICTION:
HAROIN
                     OH MAU1EE  RIVER  BASIN   1976
     ADA SEWAGE TREATMENT  PLAHT
SOCIO/POP
POPULATION IN  1980 WOULD GROW  TJ  6900.
l'*8l! C^llSUS DATA LISTED POPULATION  AT  3669.  CITY  STATED CURRENT POPULATION AT ABOUT 5003.
                                                                                                               425
    S FINDINGS:  MUCH  LESS  GROWTH  THAN EXPECTED
GOOOHUE
 ISSUE:
 PREDICTION:
 FINDINGS:  .
 MOPE FIHOINGS:
G03DHUE
     G300HUE,CITV OF
SOCIO/POP
POPULATION is EXP:CTED TO GROW AT 4.21  PER  YEAR.
I'.RO POPULATION GPOHTH.  POPULATION  HAS  REMAINED  STEADY  SINCE  1978
AT APPROXIMATELY 65}.
                                                                              HN UPPER MISSISSIPPI
                                                                                                      1982
RUSHFORD
 ISSUE:
 PREDICTION:
 FINDINGS:
 MORE FINDINGS:
FILLMORE
                                                              MN  UPPcR MISSISSIPPI
                                                                                     1983
                                                      426
                                                      427
     RUSHFOPO.CITY OF
SOCIO/POP
PROJECTLO GROWTH RATE 0.41 PER YEAS
ACTUAL US£R3 MiV ALREADY B= OVER  1545  DESIGN  POPULATION.  NEW DEVELOPMENT WOULD NOT HAVE BEEN POSSIBLE
NEW 0=VCLOPH:NT WOULD NOT HAVE BEEN  POSSIBLE  WITHOUT  UPGRADED TREATMENT CAPABILITY
UNCLEAR IF UPGRADED TREATMENT IS  CAUSE  OF  RAPID  POPULATION GROWTH (40 HOUSEHOLDS) SINCE 1984 WHEN OPEN
0.4? PCR YtAR POPULATION BASr.D ON GROWT4  RATE  FOR  PAST  80 YRS IN FILLMORE COUNTRY. RUSHFORO IS HIGH
GROWTH A
-------
CITY
BIRCHUOOO
 ISSUE:
 PREDICTION:
 FINDINGS:
   PRED1CTTUN  NOT  SUSTAINED
        CHV  RIV:*1  BASIN)

     GRANTS1:                             COUNTY                ST  RIVER  BASIN         NEPA(YR)
PLATTED SINCE  PLANT  BUILT.  12  HOUSES BUILT, 1 BANK 3UILT ON  SEWER  EXTENSION.  AVG. VALUE OF NEW HOUSES.
HIGHER THAN  IN  REST  OF VILLAGE CTQTAL VALUc $46500C HOUSES t  773000  COMMERCIAL).
                                                         WASHSURN
                                                              WI  UPPER  MISSISSIPPI   1982
     BIRCHWOOD,VILLAGE OF
SGCIO/USERCilG
HC-NTHLY USER CHARGE MILL EF  *12.33.  USER  CHARGES WILL INCREASE AS  A  RESULT  OF  PROJECT.
CHAPGES FO? 1935, WHICH INCLUDES  PART  OF  NEW PLANT COSTS ARE $52.82/QUARTER  OR 17.60/HONTH.
                                                                                               430
 HCIPf FINPTNGS: USr.R CHARGES MUCH HIGER  THAN EXPECTED.
PLUM CITY            PLUM CITY,VILLAGE  OF                PIERCE
 ISSUE:         SOCIO/USERCHG
 PPfcOICTIONS    USER CHARGES WILL  INCR£ASr:  TO Jl? PER MONTH.
 FINDINGS:      RATES APF CURRENTLY  «i5 PES MONTH FOR 266 USEPS.
                                                              WI UPPER  MISSISSIPPI
                                                                                      1979
                                                                                               431
 MORE FINDINGS: RATGS INCREASED  BY  3  PERCENT,C.5  PERCENT MORE THAt4 PREDICTED.
     STRUrt, VILLAGE jF
STRUM
 ISSUE:
 PREDICTION:
 FItiOItIGS:
 MORE FIUOlNGS: >?AT:-$ HIGHER THAU  PREDICTED.
                                                         TREMPEALEAU
                                                              WI  UPPER  MISSISSIPPI
US?R CHAP&e.i WILL  INCPCASE  TO  «90'.;PE!» Y£AR
CURRENTLY R-T£S  4RE  ABOUT  SI15.92/YR 0
-------
C6AUG87
CITY
 FINDINGS:
 MORE FINDINGS:
   PREDICTION NOT SUSTAINED
        (BY RIVER BASIN)


     GRANTEC                            COUNTY
POPULATION DECREASED OVEP THE OBSERVED PERIOD OF TIME,
OUp FOR THE HOST PART TO ECONOMIC FACTORS.
                                                                              ST  RIVER  BASIN
                                            NEPACYR)
CASS                 SAGINAH  COUNTY  WTP                 TUSCOLA
 ISSUE:         SOCIO/USE3CHG
 PREDICTION:
 FINDINGS:      USER RATES  HAVE  MOB;  THAN  TRIPLED DUE  TO  PLANT  EXPANSION.
                                                             MI SAGINAW RIVER BASIN 1977
                                                                                                              436
 MORE FINDINGS:
CHESANING
 ISSUE:
 PREDICTION:
 FINDINGS:
 MORE FINDINGS:
CHESANING
 ISSUE:
 PREDICTION:
 FINDINGS:
 MORE FINDINGS:
     CHESANIUG,VILLAGE CF
50C10/P00
                                        SAGINAW
                                                                              MI  SAGINAW  RIVER  BASIN  1975
                                                                                              437
WWTP DcSIGNED  POP  AN EQUIVALENT POPULATION OF 10,000. THIS INCLUDES HIGH
BOD AI10 Si L3AOS FROM A OAIRY.  POPULATION IS DECREASING SLIGHTLY.  THE DAIRY
MOVJO OUT IF TOWN  IN 1981.  THE EQUIVALENT POPULATION NOW IS AdOUT 2,800.
FACILITY w»3 DESIGNED TO ACCONOOATE A SLIGHT COPULATION INCREASE AND TO TREAT
LCD: POUND: OF eco FROM THE INDUSTRY.  THE BOO LOAD FROM THE DAIRY INDUSTRY
WAS GROSSLY UNDERESTIMATED CAUSING PROBLEMS UNTIL THE DAIRY MOVED OUT OF TOWN.
                                        SAGINAU
                     MI SAGINAW RIVER BASIN 1975
     CMESANING.VILLAGH OF
SOCIO/U5ERCHG
USER FEES AND OLM COSTS SHOULD REMAIN RELATIVELY STABLE WITH NOPMAL INCREASES.
U31R FEi.S H\VI INCREASED AT A GREATER BATE THAN PREDICTED.  THE OAIRY INDUSTRY
THtT MOVED OUT IN 1981, HAD BEEN PAYING APPROX. *50,000 PER YEAR IN USER FESSo
3U1 COSTS, AFTER THE OAIRY MOVED, WERE SPREAD OUT AMONG THE RESIDENTS.
438
DURAND
 ISSUE:
 PREDICTION:
 FINDINGS:
     DUPANP.CITY OF
SHIAMASSEE
                                                             MI SAGINAW RIVER BASIN 1976
439
POSSIPLE INDUCED POPULATION GPOWTM.
NC POPULATION GROWTH HAS OCCUPED
 MORE FINDINGS:  NO  INDUCED  POPULATION  GROWTH.  POPULATION  is  DECLINING.
TITTABAWASSEE TWP
     TITTABAWASSEt TWP WWTP
                                        SAGINAW
                     MI SAGINAW RIVER BASIN 1979
                                                     440
 ISSUE:         SOCIO/USERChG
 PREDICTION:    WESTCPN  SUBDIVISIONS  WILL  BE  HQOKED-UP  TO  THE  EXPANDED  WWTP,  ON-SITE  SYSTEMS  WILL  BE  ABANDONED.
 FINDINGS:      WESTERN  SUBDIVISIONS  ARE NOT  HOOKEO-L'P  TO  THE  NEW  EXPANDED  WWTP;  CONSEQUENTLY,
                THE USER CHARGES  HAVE  INCREASED  DRAMATICALLY (TRIPLED),  SEVERAL SUBDIVISIONS
                DECLINED SERVICE  DUE  TO HIGH  HOOK-UP  COSTS OF  *35/LINtAL  FT OF FRONTAGE.
 MORE FINDINGS: WESTERN  SU?OIVISIONS  HAVE  NOT  HOOKED-OP  TO THE  TOWNSHIPS" CENTRALIZED WWTP
                AS PREDICTED.  THE PROPcRTY OWNER5 CONSIDcR THE  HOOK-UP  ASSESSMENT  TOO GREAT.

-------
C6AUG87
CITY
   PREDICTION NOT SUSTAINED
        (BY RIVER BASIN)
                                        COUNTY
                                                              ST  RIVER  BASIN
                                                                                     NEPA(VR)
WESTON
 ISSUE:
 PREDICTION:
 FINDINGS:
 MORE FINDINGS
                                         WOOD
                                                              OH MAUHEE  RIVER BASIN  1979
                                                                                              441
     WESTON.VILLAGE OF
AGRICULTURE
ARCQX FIV: ACRES OF LAND ZONED FOR INDUSTRIAL USE WILL  BE  REQUIRED  FOR  THE  ADDITIONS AT THE UMTP SITE.
TH = ADDITIONS AT THE WMTP ONLY USED UP APPROX. THREE  ACRES  OF  LANO-TME  EXPANDED PLANT OCCUP. 5 ACRES.
THE LAND USED FOR THE ADDITIONS WAS THAT ZONED AGRICULTURALi NOT  INDUSTRIAL.

TH5 PREDICTION OVEP-FSTIMATED THE AMOUNT OF LAND TO BE  TAKEN OUT  FOR  WWTP USE.
THE PREDICTION WAS INACCURATE.AGRICULTURAL LAND WAS USED TO EXPAND  THE  SITE.
HONTP5LI5P
 ISSUE:
 PREDICTION:
 FINDINGS:
                                                              OH MAUHEE RIVER BASIN  1980
                                                                                              442
     MONTP=LIE? SWG TRT PLT             WILLIAMS
iCLID WAST?
s-i'JQVATION CF MUNICIPAL TREATMENT PLANT WILL PRIMARILY  RESULT  IN  IMPROVED  DISPOSAL OF  SLUDGE
A NEW TRUCK HAS BEEN ACQUIRED, BUT  IMPROVED  SLUDGE  DISPOSAL  HAS  NOT  COM?  ABOUT  FROH PLANT RENOVATIONS.
 MORE FINDINGS:
THERE HAVE NOT BEEN RENOVATIONS  TO  THE  TREATMENT PLANT.  THE  ONLY PROPOSED CHANGE WAS TO BE A NEW COVER
FOR THE SLUDGE DIGESTER, WHICH  DID  NOT  OCCUR. "THE OPERATOR  FELT THAT NO NOTICEABLE DIFFERENCE WOULD BE
APPARENT £VEN IF THi COV=P  HAD  HESN REPLACED.  NEVERTHELESS,  THIS WAS AN INNACCURATE PREDICTION.
WESTBY
 ISSUE:
 PREDICTION:
 FINDINGS:
 MORE FINDINGS:
                                         VERNON
                                                              WI  UPPER  MISSISSIPPI
                                                                                                     1979
                                                                                              443
     WJTST3Y SiWAGE TREATMENT PLANT
SOLID WASTF
PREDICTED APPLICATION RATE OF 10.4 TONS/ACRE/YR  WILL  REQUIRE  9  ACRES  INITIALLY t SITE LIFE 22 YRS/CORN
SLUDGE CALCULATIONS FOP MEW PLANT DESIGN ASSUMED 4T SOLIDS.ACTUAL  SLUDGE  HAS  ONLY 1.5* SOLIDS.SLUDGE
STORAGE INAPEOUATP.  LOW SOLIDS CONCENTRATIONS MEAN MOPE  LIQUID OR  MORE LAND
MAY NEED LONGc? DRYING PERIOD BSFOPt SPREADING.76 ACRES  APPROVED SITES.ACTUALLY USE 19 ACRES.
SLUDOE DISPOSAL REQUIRES MOR<: LAUD THAN PPEDICTED OR  HIGHER LIQUID  VOLUME »ER ACRE SPREAD.
WESTBY
 ISSUE:
 PREDICTION:
 FINDINGS:
 MORE FINDINGS:
     WCST9Y SEWAGE TREATMENT PLANT
SOLID WAST=
                                        VEPNON
                                                              WI  UPPER  MISSISSIPPI
                                                                                     1979
                                                                                              444
OPERATOR NO LCNGER ACCEPTS  SEPTAGE,HOLDING  TANK WASTE,OR .SANITARY LANDFILL LEACHATE.IN PAST,ACCEPTING
SUCH SOLID WASTES UPSCT PLANT FOR  UP  T3  3  WEEKS,  t  MADE  IT  IMPOSSIBLE TO SPREAD SLUDGE ON AG LAND.
TH=R= AF:- STILL MANY SEPTIC SYSTEMS  IN PLANNED  SFW^R  SrRVICH  3RFA.
NO IMP1CT ON LOCAL SOLID HASTE MANAGEMENT  SYSTEM  WAS  PREDICTED,OUT  PLANT HAS BEEN TRIED AS PART OF
LARGER SOLID U&ST^ MANAGEMENT SYSTEM  WITH  UNFORTUNATE RESULTS,I.E.  PLANT UPSET.SEPTIC SYSTEMS REMAIN
IN USE WITHIN WEST6Y CITY LIMIT.
GLADWIN
 ISSUE:
 PREDICTION:
 FINDINGS:
 MORE FINDINGS:
     GLAOWlt;,CITY OF
SOLID HAST?
                                                         GLADWIN
                                                              MI  SAGINAW  RIVER BASIN 1976
                                                                                              445
SLUDGE DRYING BIDS WILL R£MAIII  AHANOONiD  AND  LAND  APP OF  SLUDGE
ON AIRPORT LAND WILL CONTINUE,  ADJACENT TO  THE  AERATED LAGOONS.
LAND APP BEGAN IN 1983.
                                                                                                     t
SMELL LAKE
 ISSUES
 PREDICTION:
 FINDINGS:
                                                         WASHBURN
                                                              WI UPPER MISSISSIPPI   198).
     SHELL LAKE,CITY OF
ENERGY
ANNUAL ENERGY C3STS MILL BE $6000 PER YEAR,
1994 ENERGY USE IN PLANT IS «944C> PER YEAR.
PLANT USES' BLOWERS AT HIGH LEVEL TO MAINTAIN AOcOUATE  OXYGEN  FOR' PROPER  TREATMENT.
                                                                                                               446

-------
   PREDICTION NOT  SUSTAINED
        (BY  PIVE9  BASIS)
06AUG87
CITY                  GRANTEE                             COUNTY
                 WASTEWATER  IS  PUMPFD TWICE.
 MOKE FINDINGS:  ENERGY  USE  is  sc  PERCENT  HIGHER THAN PREDICTED.
                                                                              ST RIVER BASIN
                                                                                     NEPA(VR)
GLADWIN
 ISSUE:
 PREDICTION:
 FINDINGS:
                                         GLADMIN
MI SAGINAU RIVER BASIN 1976
     GLAOWItl.CITY OF
EN'RGY
HHiRCV COSTS WILL BE APpROX t50K/YR AFTER  PLANT  EXPANSION  WITH GRADUAL INCREASES
ENERGY COSTS A9t I91K/YR.  A 16X RATE HIKE  IN  USER  FEES  WAS  STARTED IN 1983.
ANOTHER 7j HIKE is ANTICIPATED IN THE NEAR  FUTURE.
                                                                                                               447
 MORE FINDINGS: BECAUSr  THE  COST  OF  ELECTRICITY  =>JV.  TO UNEXPECTEDLY HIGH RATES, OPERATING
                EXPENSES H»V=  GONE UP  TO  COVER THE  INCREASED COSTS.
                USER FEES  HAVE  INCREASED  16?.
PHILLIPS
 ISSUE:
 PREDICTION:
 FINDINGS:
 MORE FINDINGS:
     PHILLIPS,CITY OF
AIR QUALITY
                                         PRICE
WI UPPER MISSISSIPPI
                                                                                     1980
                                                                                              448
FREQUENT OOOP COMPLAINTS FROM  NEARBY  COMMERCIAL ESTABLISHMENTS AND RESIDENCES.
MAJOR SOURCtS OF ODORS COULD BE OVERLOADED  RBC  OR  POORLY OPFRATED DIGESTER.
PLANT is LOCATED IN AREA OF INDUSTRY  AND  COMMERCIAL  DEVELOPMENT. RESIDENCES LOCATED ACROSS LAKE

-------
C6AUG8T
CITY

CRID:=RSVILLE
  ISSUE:
  PREDICTION:
  FIIIDIUGS:
   NO IMPACT CONCERNS
        CEY RIVtR 8ASIN)


     GRANTED


     CRIOcPSVILLE,VILLAGE OF

WATcR QUAL/GROUNO
COUNTY


AUGLIAIZE
ST RIVER BASIN         NEPA(YR)


OH MAUMEE RIVER BASIN  1977     449
 MOPE  FINDINGS:
MCNTFELIER           MONTPELIER  SWG  TRT PLT              WILLIAMS              OH MAUHEE RIVER BASIN  1980     450
  ISSUE:         WATER  QU«L/G"OUNO
  PREDICTION:
  FINDINGS:


  MORE FINDINGS:



TOLEDO               TOL?DO-«AL6RIDGE                    WOOD                  OH MAUMEE RIVER BASIN  1980     451
  ISSUE:         WATEP  QU«L/«iFQUIIO
  PREDICTION:
  FinoiNGS:


 MORE FINDINGS: GPQUND WATER  ISSUES  W=HE NOT  AODSCSSEO.



TOLEDO               TnL?00,CITY OF  (TEN MILE C^?EK)     LUCAS                 OH MAUMEE RIVER BASIN  19TT     452
  ISSUE:          UATc
-------
06AUG87


CITY

 MORE FINDINGS:
                    HO IMPACT CONCERNS
                         CUV 5IVEP  BASIN)


                      GR-JNTE:
                                                          COUNTY
ST RIVER BASIN
NEPACfR)
 BANGOP               r:ANr,Ot?, VILLAGE  OF                  LACROSSE              WI UPPER MISSISSIPPI    1978     455
  ISSUE:          WATLR IJU^L/GPOUNO
  PREDICTION:
  FINOIN&S:


  MORE  FINDINGS:


^^» ^^ «•» ^ « ^ ^ ™ • •• ••• ^ A ^ ^*^ ^ ^ ^ ^ ^ o^^ IB ^ ^ ^ llv ^ ^^ ^ ^ ^^^ ^^ ^^ ^^ ^^ ,^ ^^ ^^ ^^ ^ ^^ •• ••• ^ ^^ ^ ^ ^^ ^ ^ •» ^ ^ ^ ^«» •• «A ^^ ^ ^ ^ •• ^ •• ^ mt^ ^ ^^ ^ ^ ^«» ^ ^^^*«i*^^ ^B ^ «A «^^»^ ^ ^^ ^
eiRCHWOOO             9IRCHMOOO,VILLAGE UF               WASH^UPN              MI UPPER MISSISSIPPI    1982     *56
  ISSUE:          WAT2R -JUiL/jURPAC?
  PREDICTION:
  FIHOINGS:


  MOR3 FINDINGS:



OE SOTO               D:SOTO,VILL»GE  OF          •        VLRNON/CRAWFORD       wi UPPER MISSISSIPPI    1978     *57
  ISSUE:          WJTHR QU»L/opaiJNO
 P»EOICTION:
 FINDINGS:


 MORE FINDINGS:



PHILLIPS              PHILLIPS,CITY OF                    PRICE                 wi UPP=R MISSISSIPPI    1980     *58
  ISSUS:          WATiR QU4L/G?OUNO
 PPEOICTITN:
 FINDINGS:


 MORE FINDINGS:


~V*_«.HH____«H_>*..W_._«_««_—_•-»«« —— —• — — ••— — — — — — — — ^—— — — —— — — — — — — * — — — — —. — — »_ — -.„«_»^—»„ — •»— — •,— ••. — — «.—• — — ••• — •••—• —
WESTBY                WFSTBY SlWAGi TREATMENT PLANT      V53NON                HI UPPER MISSISSIPPI    1979     459
  ISSUE:          MATER QU»L/Gt?QUUO
 PREDICTION:
 FINDINGS:


  MORE FINDINGS:



ST.  LOUIS             ST.  LOUI5,  CITY OF                  GRSTIOT               MI SAGINAH RIVER BASIN  1974     460

-------
C6AUG87
CITY
 ISSUE:
 PREDICTION:
 FINDINGS:
   NO IHPACT CONCERNS
        (BY R1V5R BASIN)


     GRANTEE
WATER QUAL/GPOUND
                                                        COUNTY
ST RIVER BASIN
NEPA(TR)
    E FINDINGS:
BURTON             '  GENESSE!: COUNTY (OAVISON SEGMENT)  GENESSEE              HI  SAGINAU  RIVER  BASIN  1978      461
 ISSUE:         UATER JUAL/SURFACE
 PREDICTION:
 FINDINGS:


 MORE FINDINGS:



CASS                 SAGINAU COUNTY WTP                 TUSCOLA               HI  SAGINAM  RIVER  BASIN  19TT      462
 ISSUE:         MATER QUAL/GROUNO
 PPEOICTION:
 FINDINGS:


 HOP* FINDINGS:1



CHESANING            CHESANING,VILLAGE CF               SAGINAW               HI  SAGINAW  RIVER  BASIN  197S      463
 ISSUES         WATtR QUAL/GROUHD
 PREDICTION:
 FINDINGS:


 MORE FINDINGS:



RIDGHVILLE CORIIEPS   HENRY COUNTV
-------
06AUG87
CITY
                  NO  IMPACT  CONCERNS
                        C8Y  RIVtR  8ASIN)


                    GPANTEE
                                                         COUNTY
                     ST RIVER BASIN
                       NEPACVR)
MESTON
 ISSUE:
 PREDICTION:
 FINDINGS:
                     WFSTON,VILLAGE OF
                WETLAHDS
WOOD
OH HAUHEE RIVER BASIN  1979     466
 MORE FINDINGS: NO.ISSUE PRESENTED  IN  DOCUMENTATION.
GOODHUE
 ISSUE:
 PREDICTION:
 FINDINGS:
                     GOGDHUE.CITV OF
                WETLANDS
GOODHUE
MN UPPER MISSISSIPPI   1982     467
 MORE FINDINGS:
ROCHESTER
 ISSUE:
 PREDICTION:
 FINDINGS:
                WETLAHDS
                                    OF
OLMSTED
                                                                             MN UPPER MISSISSIPPI   1978      468
 MORH FINDINGS:
BARRON
 ISSUE:
 PREDICTION:
 FINDINGS:
                     BARRON,CITY OF
               WETLANDS
BAPRON
WI UPPER MISSISSIPPI   1983     469
 MORE FINDINGS:
PHILLIPS
 ISSUE:
 PREDICTION:
 FINDINGS:
                     PHILLIPS,CITY  OF
               WSTLAUOS
PRICE
WI UPPER MISSISSIPPI   1983     470
 MOPE FINDINGS:
SMELL  LAKE
 ISSUE:
 PREDICTION:
                     SHELL L»K=,C!TY  OF
                WETLANDS
WASHSURN
WI UPPER MISSISSIPPI   1983      471

-------
C6AUG87
CITY
 FINDINGS:
   no IMPACT CONCERNS
        (EY RIVER BASJN)

     GPANTFt
COUNTY
ST RIVER BASIN
NEPA(VR)
 MORE FINDINGS? CONSTRUCTION NOT LOCATED IN WETLAND.
WEST8Y
 ISSUE:
 PREDICTION:
 FINDINGS:
     WESTBY SEWAGE TREATMENT PLANT
WHTLANPS
VERNON
WI UPPER MISSISSIPPI   1979     472
 MOfcE FINDINGS: NOT AH ISSUL.
PURTON
 issu::
 PREDICTION:
 FINDINGS:
              COUNTY (DAVISON SEGMENT)  GENESSEE
WtTLAHrtS
                     MI SAGINAU RIVER BASIN 1978     473
 MORE FINDINGS:
CHCSANING
 ISSUE:
 PREDICTION:
     CHtSAMI^G,VILLAGE JF
WL-TLANDS
 MORE FINDINGS:
SAGINAM
MI SAGINAM RIVER BASIN 1975     474
PURA NO
 ISSUE:
 PREDICTION:
 FINDINGS:
     DURAND.CITY OF
WETLANDS
SHIAWASSEE
MI SAGINAU RIVER BASIN 1976     475
 MORE FINDINGS:
GLADWIN
 ISSUE:
 PREDICTION:
 FINDINGS!
     GLADWIN.CITY OF
WETLANDS
GLAOWIN
MI SAGINAM RIVER BASIN 1976     476
 MORF FINDINGS:

-------
06AUG87
CITY
    NO IMPACT CONCERNS
         (6V RIVSR BASIN)


      GRANTEE
COUNTY

LIVINGSTON
ST RIVER 3ASIN         NEPA(YR)


MI SAGINAU RIVER BASIN 1976     477
HOWELL
 ISSUE:
 PREDICTION:
 FINDINGS:
      HOHELL.CITY OF
 WETLANDS
 MOPE FINDINGS:
LAPEER
 ISSUE:
 PREDICTION:
 FINDINGS:
      LAPEEP.CITY
 WETLANDS
LAPEER
                                                                  SAGINAU  RIVER  BASIN  1976      478
 MORE FINDINGS:
TOLEDO
 ISSUE:
 PREDICTION: .
 FINDINGS:
      TOLEDO,CITY OF (T?N MILE CREEK)
. FLOOnPLfllNS
LUCAS
OH MAUHEE RIVER BASIN  1977     479
 MORE FINDINGS: FLOODPLAIN was NOT A CONC:SN
WESTON
 ISSUE:
 PREDICTION:
 FINDINGS:
      WINSTON,VILLAGE OF
 FLOQDPLAINS
WOOD
OH MAUMEE RIVER BASIN  1979     480
    ? FINDINGS: NO ISSUE P
-------
C6AUGS7



CITY
                   NO IMPACT CONCERNS
                            PIVER BASIN)
                                                        COUNTY
      FINDINGS: CONSTRUCTION NOT LOCATED IN FLOOOPLAIN
                                                             ST RIVER BASIN
                                            NEPA(TR)
MESTBV
 ISSUE:
 PREDICTION:
 FINDINGS:
     WESTor SEWAGE TREATMENT PLANT
FLOOOPLAINS
                                                        VERNON
                     MI UPPER MISSISSIPPI   1979     483
 MORE FINDINGS: NCT AN ISSUE.
BURTON
 ISSUE:
 PREDICTION:
 FINDINGS:
     GEI
-------
 06AUG8T
 CITt
  ISSUE:
  PREDICTION:
  FINDINGS:
   NO IMPACT CONCERNS
        (BY RIVcR BASIN)
     GRANTEE
COUNTY
BIOTA
ST RIVER BASIN
                                                                                                     NEPA(YR)
  MORE FINDINGS:
 BURTON
  ISSUE:
  PREOICTI3N:
  FINDINGS:
     GENESSEE COUNTY (OAVISON SEGMENT)  GENESSEE
BIOTA
                     MI SAGINAU RIVER BASIN 1978     489
 MORE  FINDINGS:
CHESANING
  ISSUE:
  PREDICTION:
  FINDINGS:
     CHESANING.VILLAGE OF
BIOTA
SAGINAW
MI SAGINAW RIVER BASIN 1975     490
 MORE FINDINGS:
GLADUIN
 ISSUE:
. PREDICTION:
 FINDINGS:
BIOTA
     GLAOWIh,CITY OF
GLADUIN
MI SAGINAW RIVER BASIN 1976     491
 MORE  FINDINGS:
 HOWELL
  ISSUE:
  PREDICTION:
  FINDINGS:
BIOTA
     HOWELL,CITY OF
LIVINGSTON
   SAGINAW RIVER BASIN 1976     492
 MORE  FINDINGS:
ST. LOUIS
 ISSUE:
 PREDICTION:
 FINDINGS:
     ST. LOUIS, CITY OF
SOCIO/POP
GR4TIOT
                     MI SAGINAW RIVER BASIN 1976     493
 MORE FINDINGS:

-------
P6AUGS7
CITY
NO IMPACT CONCERNS
     (flT PiVtR BASIN)


  GFANTEE
                                                        COUNTT
ST RIVER BASIN
NEPA(VR)
GOODHUF              GODOHUE.CITt Of                    GOOOHUE              MN UPPER  MISSISSIPPI    1982      494
 ISSUE:         AGRICULTURE
 PREDICTION:
 FINDINGS:


 MORE FINDINGS:



POCHESTPR            ROCHESTER,CITY OF                  OLNSTED .             MN UPPER  MISSISSIPPI    1978      495
 ISSUE:         AGRICULTURE
 PREDICTION:
 FINDINGS:


 MORE FINDINGS:



ALMA                 ALMA MUNICIPAL HASTeUATER TRMT PLT BUFFALO              WI UPPcR  MISSISSIPPI    1980      496
 ISSUE:        • AGRICULTURE
 PREDICTION:   !
 FINDINGS:


 MORE FINDINGS:



ST.  LCUIS            ST. LOUIS, CITY OF                 GRATIOT              MI SAGINAW RIVER BASIN 1976      497
 ISSUE:         AGRICULTURF
 PREDICTION:
 FINDINGS:


 MORE FINDINGS:



BURTON               GEN6SSE8 COUNTY (DAVISGN SEGMENT)  GENESSEE             MI SAGINAU RIVER BASIN 197B      498
 ISSUE:         AGPICULTURr-
 PREDICTION:
 FINDINGS:


 MORE FINDINGS:



CHESANING            CHESflNING,VILLAGE OF               SAGINAW              MI SAGINAM RIVER BASIN 1975      499
 ISSUES         AGRICULTUR6
 PREDICTION:

-------
 06AUG87
 CITY
  FINDINGS:
   f<0 IMPACT CONCERNS
        
-------
 06AUG87
NO IMPACT CONCERNS
     
-------
06AUG3T
NO IMPACT CONCERNS
     (BY SlIVcR BASIN)
CITY

 MORE FINDINGS:
  GRANTEE
                                                        COUNTY
                                                          ST RIVER BASIN
                                                                                                    NEPA(YR)
DURAND               DURAMO.CITY 0*                     SHIAWASSEE           MI SAGINAU RIVER BASIN 1976     511
 ISSUE:         PHYS ENV
 PREDICTION:
 FINDINGS:


 MORE FINDINGS:



KALIOA               KALIOA,VILLAGE OF                  PUTNAM               OH MAUMEE RIVER BASIN  1976     512
 ISSUE!         CULTURAL ^SOURCE
 PREDICTION:
 FINDINGS:


 MORE FINDINGS:


	—-i	•	—	—™—--—
MONTPELIER           MONTPfLIER SWG TRT PLT      '••'       WILLIAMS             OH MAUMEE RIVER BASIN  1980     513
 ISSUE:         CULTURAL RCS3URC"
 PREDICTION:
 FINDINGS:


 MORE FINDINGS:



TOLEDO               TCLEDO-HAL9RIOGS                   WOOD                 OH HAUMEE RIVER BASIN  1980     51*
 ISSUE:         CULTURSL R^SOU^CI:
 PREDICTION:
 FINDINGS:


 MORE  FINDINGS: NO  IMPACTS WERE PREDICTED OR OCCURRED.



GOOOHUE              GOODHUEtCITY OF                    GOODHUE              MN UPPER MISSISSIPPI   1982     515
 ISSUE:         CULTURAL RESOURCE
 PREDICTION:
 FINDINGS:


 MORE FINDINGS:



ROCHESTER            ROCH^STHR.CITY OF                  OLMSTSO              MN UPPER MISSISSIPPI   1978     si6

-------
 06SUG8T
 CITY
  ISSUE:
  PREDICTION:
  FINDINGS:
   HO IMPACT CONCERNS
        (HIT 
-------
 06»UG8T
CITY
   NO IMPACT CONCERNS
        (BY RIVER BASIN)


     GRANTEl
                                        COUNTY
                     ST RIVER BASIN
                                                                                                     NEPA(YR)
TOLEDO
  ISSUE:
  PREOICTI3N:
  FINDINGS:
     TOLEDOiCITY OF (TEN MILE CREEK)
SOLID UAST?
LUCAS
OH MAUMEc RIVER BASIN  1977     522
 HOPS FINDINGS: NO SOLID UASTS  ISSUES  UERS  ADDRESSED
WESTON
 ISSUE:
 PREDICTION:
 FINDINGS:
     UfiSTON,VILLAGE OF
SOLID UAST'
WOOD
OH MAUHEE RIVER BASIN  1979      523
 MORE FINDINGS: NO issut PKSS:NT^O  IN  DOCUMENTATION.
ROCHESTER
 ISSUE:
 PREDICTION:
 FINDINGS:
     POCH?STcR,CITY OF
SCLIO UAST?
OLMSTEO
MN UPPER MISSISSIPPI   1978     524
.MORE FINDINGS:
BURTON
 ISSUE:
 PREDICTION:
 FINDINGS:
     GFHESSEr COUNTY (OAVISON SEGMENT)  GSNESSEc
SOLID WASTE
                     MI SAGINAU RIVER BASIN 1978     525
 MORE FINDINGS:
CHESANING
 ISSUE:
 PREDICTION:
 FINDINGS:
     CHESANINGtVILLAGE OF
SOLID UASTF
SAGINAU
MI SAGINAU RIVER BASIN 1975     526
 MORE FINDINGS:
HOMELL
 ISSUE:
 PREDICTION:
     HOMELL,CITY OF
SOLID HflSTf
LIVINGSTON
MI SAGINAM RIVPR BASIN 1976      527

-------
C6ftUGt!7
CITY
 FINDINGS:
((0 IMPACT CONCERNS
     
-------
C6AUG87
CITY
   NO IMPACT CONCERNS

        CJY RIVER BASIN)
                     GRANTED                             COUNTY


                     TOLEDO,CITY  OF  (TEN  MILE  CREEK)     LUCAS
                                                              ST  RIVER  BASIN          NEPA(YR)


                                                              OH  MAUMEE RIVER  BASIN  1977     533
TOLEDO
 ISSUE:
 PREDICTION:
 FINDINGS:
 MORE FINDINGS: ENERGY  ISSUES  MERC  NOT  ADDRESSED
TOLEDO
 ISSUt:
 PREDICTION:
     TOLEDO,CITY OF (BAYVIEH)
ENERGY
                                                         LUCAS
OH MAUHEE RIVER BASIN  1983     534
    f: FINDINGS: NOT AN  issu:.
UESTON
 ISSUE:
 PREDICTION:
 FINDINGS:
     WcSTON,VILLaC.E OF

ENERGY
                                        WOOD
                                                                              OH MAUMEE RIVER BASIN  1979     535
 MORE FINOINCS: NO ISSUE PPES=NTHD  IN  OOCU»«E NTAT ION.
GOODHUE              GOCDHUE.CITV  CF
 ISSUE:         ENERGY
 PREDICTION:
 FINDINGS:
                                                         GOCDHUE
                                                              MN  UPPSR  MISSISSIPPI    1982      536
 MORE FINDINGS:
ROCHESTER
'ISSUE:
 PREDICTION:
 FINDINGS:
     ROCHESTER,CITY OF
ENERGY
                                                         OLHSTED
HN UPPER MISSISSIPPI   1978     537
 MORE FINDINGS:
AUGUSTA              AUGUSTA,CITY  OF
 ISSUE:         ENERGY
 PREDICTION:
 FINDINGS:
                                                         EAU  CLAIRE
                                                              WI  UPPER  MISSISSIPPI    1977     538

-------
C6AUC87



CITY
NO IMPACT CONCERNS
     (PY "JIVE"; 8ASIN)


  GRANTEE
       FINDINGS:
COUNTt
ST RIVER BASIN
NEPA(TR)
 CORNELL              CORNELL,CITY OF                    CHIPPEWA             WI UPPER  MISSISSIPPI    1980      539
  ISSUE:         :Nr-Ri-.Y
  PREDICTION:
  FINDINGS:


  HORE FINDINGS:

i

 CUMBERLAND           .CUM8EPLAN9.CITY OF                 9ARRON               WI UPPER  MISSISSIPPI    1978      5*0
  ISSUE:         :N!RGY
  PPEOICTTON:
  FINDINGS:


  MOKE FINDINGS:



 UEST3Y         :      WEST3Y S:WiG= TREATMENT PLallT      VERNON               UI UPPER  MISSISSIPPI    1979      541
  ISSUE:          EN-RGY
  PREDICTION:
  FINDINGS:


  MORE FINDINGS: NOT  an issut.



 ST. LOUIS             ST.  LOUIi,  CITY OF                 GR4TIOT              MI SAGINAH  RIVER  BASIN  1976      5*2
  ISSUE:          ?f,-RGY
  PREDICTION:
  FINDINGS:


  MORE FINDINGS:



 BURTON                GEIIESSEe COUNTY (OAVISCN S£GMENT)  GENESSEE             MI SAGINAJ  RIVER  BASIN  1978      5*3
  ISSUE:          EK5RGY
  PREDICTION:
  FINDINGS:


  MORE FINDINGS:



 CHESANING             CH^SAMI'/Q.VILLAG: OF               S«GINAW              MI SAG^NAU  RIVER  BASIN  1975      s*«

-------
C6AUG8T
cm
 ISSUE:
 PREDICTION:
 FINDINGS:
                   NO IMPACT CONCERNS
                        (BT PIVER  BASIN)
                SN-.RGY
                                                         COUNTY
                                                                              ST RIVER BASIN
                                                                                                     NEPACTR)
 MORE FINDINGS:
HOLLY
 ISSUE:
 PREDICTION:
 FINDINGS:
                     OAKLAND COUNTY 0PM
                ?NERGY
                                                         OAKLAND
                                                                              MI SAGINAW RIVER BASIN 1977     545
 MORE FINDINGS:
HOWELL
 ISSUES    .
 PREDICTION:
 FINDINGS:
                     HOHELLtCITV OF
                SNERGY
                                                         LIVINGSTON
                                                                              MI SAGINAW RIVER BASIN 1976     546
 MORE FINDINGS:
GOOOHUE
 ISSUE:
 PREDICTION:
 FINDINGS:
                     GOUDIIUE.CITY OF
                AIR OUtLIT*
                                                         GOODHUE
                                                                              MN UPPHR MISSISSIPPI   1982     547
 MORE FINDINGS:
ST. LOUIS
 ISSUE:
 PREDICTION:
 FINDINGS:
                     ST. LOUIS, CITY OF
                AIR QUALITY
                                                         GRATIOT
                                                                              Ml SAGINAM RIVER BASIN 1976     548
 MORE FINDINGS:
BURTON
 ISSUE:
 PREDICTION:
 FINDINGS:
                     GENESSEE COUIITY  COAVISON  SEGMENT)   GENESSEE
                AIR QUALITY
                                                                              MI  SAGINAM RIVER BASIN 1978     549
 MORE FINDINGS:

-------
C6AUG87
CITY
NO IMPACT CONCERNS
     
-------
"6AUG87
CITY
ADA
 ISSUE:
 PPED:CT:ON:
 FINDINGS:
                    CONCLUSION NOW MOULD BE PREMATURE
                             RIV'R 8ASIN)
                                         COUNTY

                                         HAROIN
     ADA SEWAG=  TREATMENT  PLANT
WATER QUAL/GPOUNO
REHABILITATION OF  SEHERS  WILL  PREVENT EXFILTRATION TO GROUND HATER
NO DATA HAS AVAILABLE  AFTER  REHABILITATION.
NO EVIDENCE OF GROUNDHATER  CONTAMINATION NOTED
                                                               ST RIVER BASIN         NEPA(YR)  .

                                                               OH MAUMEE RIVER BASIN  1976      555
 MOKE  FINOIMGS:  NO LVIO;MCC OF GPOUNOHATER CONTAMINATION.
HARROC
 ISSUE:
 PREDICTION:
 FINDINGS:
     HARPOD,VILLAGE  OF                   ALLEN
WAT^R QUiL/bPOUNO
ELIMINATION 0*  INDIVIDUALLY  OPERATED  SEPTIC TANKS
GRcATLY RiOUCeO POSSI3ILITY  OF  WELL CONTAMINATION.
                                                               OH MAU1EE RIVER BASIN  197T
                                                                                               556
 MOPS FINDINGS:  "F.DUCi.O POTENTIAL F3R HELL CONTAMINATION.
MONTPELIER
 ISSUE:
 PREDICTION:
 FINDINGS:
 MORE FINOIMGS:
                                         WILLIAMS
                                                               OH MAUMEE RIVCR BASIN  1980
                                                                                               557
      MONTPELISP  SHG  TRT  PLT
WATEP QUAL/SURCACC:
WATcR QUALITY  SHOULD IMPROVE  FROM DECREASE IN SANITARY POLLUTANTS  DISCHARGED
SOMF  COMMERCIAL  BUSINESSES ARE  ON-LINE TO THE HUTP.
THERE «£E  STILL  MANY INOIVIO.  TRrAT.  SYS. DIRECTLY DISCHARGING.

TH? PREDICTION H»i STRICTLY QUALITATIVE AND,GEN5RALLY(HATER QUALITY  HAS  INCR.  FROM ADDIT. OF INO.  SYS.
THTRE Anc  »"J«JY ItlOIV.  STILL DISCHARGING WITH  ASSOC. PROBLEMS HHICH  CAN'T BE  EVALUATED M/A QUAL. PREOIC
TOLEDO
 ISSUE:
 PREDICTION1:
 FINDINGS:
 MORE FINDINGS!
                 OF C8AYVi?t.)
                                         LUCA5
                                                              OH MAU1EE  RIVER  BASIN  1982
558
DON PUMi-lS OF HWTP SAID GROUND WAT^R  MONITORING NOT OONE AT PLANT.
PLillT [5 JN P.:CLA!MiO LAND.  K'rVIN WID'MANt  CEPA/P^WLING GREEN, STATED  THAT
NO GRODNO WAT'.R MONITORING DONr  Iti THi  VACINITY OF 5LUOGE App FIELDS.
NO IMPACT APPARENT.
ALMA
 ISSUE:
 PREDICTION:
 FINDINGS:
                                                              MI UPPER MISSISSIPPI
                                                                                      1983
                                                                                                                559
     tll'.A MUNICIPAL  WASTEWATER  TRHT  PLT BUFFALO
WATER QUAL/iURFAC"
THF WATI-R QUALITY  OF  THE  MISSISSIPPI  RIVER HILL 9t IMPROVED
1983: :i.FLU.'IT/£FFLUFNT  (M'./L):  ?OD5:  JULY = 41/13, DEC = 114/15,  SS:  JULY  = 62/6, DEC = 113/8.
PLRMIT LIMITS  (EXPIRING  1987):  BQC5  (MONTHLY AVG) = 3C MG/.L, SS (MONTHLY  AVG)  = 30 MG/L (0.123 MGO).
 MOPE FINDINGS:  POLLUTANT  LOADING: HAVE DECREASED CONSIDERABLY
                 AS HATTR QUALITY DATA FOR THE MISSISSIPPI PIV3P  ARF  NOT  AVAILABLE, THE ACCURACY CANNOT BE DETERMINED.
                 TH=  CCNSTRUCTIOH HAS ~UD = IT POSSIBLE *=OR THe PLANT  TO  MEET ITS REQUIRED PERMIT LIMITS

                                                                                                                560
6APRON
 ISSUE:
 PREDICTION:
 FINDINGS:
                                         BARRQN
     tARRON.CITY  OF
HATER OUAL/OROUND
IMPACTS OH G"OUNDHATFR SHOULD NOT BE SIGNIFICANT OR LASTING.
EXISTING PLANT  IS ABANDONED.  ALL TREATED EFFLUENT TO GROUNDWATER.
NEW. PLANT MEETS NPD£S  LIMITS.  HAS BETTER REMOVAL RATFS.
                                                              HI UPPER MISSISSIPPI
                                                                                      1980

-------
 06AUG87
                   CONCLUSION NOW WOULD 8 = PPtMATURE
                        (CY RIVER 3ASIN)
                                                                              ST  RIVER BASIN
CITY                 GPANTFE                             COUNTY
                GROUNDWATEP  USES (JOT AFFECTeD BY SEePAGE CELL DISPOSAL.
 MORE FINDINGS:  MONITORING  PROGRAM INCONCLUSIVE DUE TO LIMITED DATA SINCE 1982.
                GROUND  WATER  NOT SERIOUSLY IMPACTED, BUT LONG TERM IMPACT NOT KNOWN VET.
                                                                                     NEPA(VR)
BRUCE
 ISSUE:
 PREDICTION:
 FINDINGS:
 MORE FINDINGS!
                                                        RUSK
                                                                             WI UPP5R MISSISSIPPI
                                                                                     1980
561
                         ,VILLAGE OF
               WATER QUAL/GROUNO
               EXISTING PRIVATE WELLS WILL REMAIN UNAFFECTED,IMPROVEMENT  IN  QUALITY  OF  GROUNDWATER TO CHIPPPEWA RIVER
               THE ONLY DATA SET FROM MONITORING WELLS SHOWS  SCK  HIGHER THAN BASELINE  DATA
               TO'S,ALKALINITY AND HARONES is LOWER THAN  BASELINE  DATA.BOO t  TSS  INTO SEEPAGE CELLS MEETS NPDES LIMITS
               NO DPINKING WATER WELL CATA AVAILABLE  EXCEPT  FECAL CQLIFORM WHICH SHOWS  ABSENSE OF FECAL COLIFORM.
               GROUNDWATER QUALITY IMPROVED F03 TOS,HARDN3SS,EALKALINITY,BUT DID NOT FOR  S04,REMAINED THE SAME FOR N
               MONITORING DATA MAY NGT BE REPP; Si ,'ITATI V6  OF  GROUNDWATER FROM SEEPAGE CcLL »1 DUE TO WELL LOCATION
               LIMITED AND QUESTIONA3LE DATA DO:S NOT ALLOW  EVAluATION,EFFLUENT  TO SEEPAGE CELLS MEETS NPOES LIMITS.
PRUCF
 ISSUE:
 PREDICTION:
 FINDINGS:
                                                                             UI UPPcR MISSISSIPPI   1980
     BPUC;,VILLAGE OF                   RUSK
WATER QUAL'SUReAC£
IMPROVEK'-NT In CHIPPEWA RIVER QUALITY OVcR LONG TERM
HO SURFACE WATER QUALITY DATA AVAILABLE. NO BENTHIC STUDIES  HAVE  BEEN  DONE  IN  1980'S
562
 MORE FINDINGS:
BUTTERNUT
ISSUE:
PREDICTION:
FINDINGS:
EUTTrP-NUT, VILLAGE UF . V ASHLAND
WATLR guaL/G^OUND
NC SIGNIFICANT ADVERSE EFFECTS ON GPOUNDWATE2.
NO D4T4 ON ACTUAL G^OUNDUATEP CONCITIONS
WI UPPER MISSISSIPPI 1981
                                                                                                              563
 MORE FINDINGS: IMPACT FROM EFFLUENT  is UNKNOWN.
COOh VALLEY
 ISSUES
 PREDICTION
 FINDINGS:
                                                        VERN3N
                                                             WI  UPPER  MISSISSIPPI    1981
564
                    COCN VALLEY MUNICIPAL WWTP
               WATER QUAL/C-SOUNr!
               G30UND«AT=R HAY 92 TEMPORAPILY  IMPACTED  DURING  CONSTRUCTION.  SLUDGE DISPOSAL  MAY  AFFECT GROUNOWATER
               NEW LAGOONS AR? STILL  SEEPING SINCE CLAY BOTTOMS  »  SIO^S  ARE  NOT  VET COMPLETELY SATURATED.
               JUST SFTER CONSTRUCT EFFLUENT WAS ONLY 37? OF INFLUENT. NOW  EFFLUENT UP TO 45000  GPO  (75t OF INFLUENT)
               IMPACTS ON CW QUALITY  UNKNOWN.  SLUDGE DISPOSAL  PROBLEM FROM  OLD PLANT IS GONE.  NO LAGOON SLUDGE VET.
MORE FINDINGS: THE ORIGINAL FNSI WAS  BASED ON  AN pec ALTERNATIVE P.ATHFR  THAN THE AERATED LAGOONS THAT WERE BUILT.
                 E RiSI + FACILITY PLAN ON WHICH IT WAS BASED  DID  NOT MENTION GROUND WATER
COON VALLrY
 ISSUE:
 PREDICTION:
 FINDINGS:
                                                        VERNON
                                                             WI  UPPER MISSISSIPPI    1981
565
                    COON VALLEY MUNICIPAL WWTP
               WATER QUAL/SURFJCE
               DECREASE IN THE EFFLUENT CONCENTRATION TO  COON  CPEFK.  WATER  QUALITY  WILL  BENEFIT.
               COHN C^fcEK STILL CLASS  III BROWN  TROUT STREAM,LOCAL  RESIDENTS  NOTICE NO RECENT  MAJOR  CHANGES
               NOW CONFORMS TO H/30 LIMITS  FOR  BOD  + SUSPENDED  SOLIDS.  CHLORINE  RESIDUAL UNDER 0.5  MG/L.  NO PROBLEMS
 MORE FINDINGS: NEW PLANT OPERATES WITH EFFLUENT DISCHARGE WITHIN  30/30  AVG.  BOD  *  SUSPENDED SOLIDS LIMITS.  NO MORE BA
                D SHOCK LOADS FROM CREAMERY. EFFLUENT ONLY 75?  OF  INFLUENT  BECAUSE  PONOS  HAVE NOT COMPLETELY STOPPED
                Sc'PING, THOUGH THIS IS EXPECTED SOON.  SOME  PH  VIOLATIONS  (9.03-9.05J  DUE  TO ALGAE. INFL 60,000 GPO.
STRUM
                     STROM,VILLAGE OF
                                                        TREMPrSLEAU
                                                             WI  UPPER  MISSISSIPPI    1980
566

-------
06AUG87
CITY
 ISSUE:
 PREDICTION:
 FINDINGS:
   CONCLUSION NOM WOULD BE PREMATURE
        (BY RIVCR BASIN)


     GPANTEE
WATER QUAL/GROUNO'
COUNTY
ST RIVER BASIN
NEPA(VR)
    E FINDINGS: NO KNOWN DETERIORATION OF GROUNDWATER QUALITY HAS OCCURRED.
PURTON .              GENESSEE COUIITV  (DAVISON SEGMENT)  GENESSEE             MI SAGINAW RIVER BASIN 1978      567
 ISSUE:     .»*» WATER QUAL/GROUNO
 PREDICTION:   i IMPROVED GROUNOWATER  QUALITY ANO P = DUCC.D MEALTH HAZARDS ASSOCIATED WITH ON SITE SYSTEMS
 FINDINGS:      AS PREDICTED, NO QUANTIFIABLE INFORMATION PROVIDED.


 MOR =  FINDINGS: ALL PROPOSED WORK  MAS  BEEN COMPLETED. ON-SITE SYSTEMS ARE BEING ELIMINATED AS A RESULT OF MOOR-UP TO
                SANITARY StWtPS.


DURAMC               DURANDiCITY OF                     3HIAWASSEE           MI SAGINAW RIVER BASIN 1976      568
 ISSUE:         WATER liUAL/'iROUNO
 PREDICTION:    :HHANS= WAT;R QUALITY  ^Y REMOVING FAILING SEPTIC TANKS IN VERNON TOWNSHIP.
 FINDINGS:     . NO siwr^ LIII: in V=*NON TOWNSHIP,  no BACKGROUND D*TA AVAILABLE.


 MOR': FINDINGS:



DURANO    .           DURAND.CITY CF                     SHIAWASSEi:           MI SAGINAW RIVER BASIN 1976      569
 ISSUE:         WATdR JlML/SURFACc-
 PREDICTION:    WATC? QUALITY OF jHiiwassE; PIV-.R CNHANC = D.
 FINDINGS:      AS PREDICTED. DUALITY  OF PLANT EFFLUENT HAS SEEN HMHANCEC DUE TO THE UPGRADING.
                BUT RIVCR Ij CONTAMINATEO 8Y UPSTREAM INDUSTRIAL SOURCES OF PCB.

 MOR^  FINDINGS: PUNT DISC^A'.tS TO a  S-iCTTOH CF THS SHIAHASSEE ^IVE^ WHICH WAS CONTAMINATED
                IN THf hASLY 1^7T"S.   WATER QUALITY CF PLANT EFFLUENT HAS BEEN IMPROVED.


GLADWIN              GLADWftl.CITY  OF                    GLADWiN              MI SAGINAW RIVER BASIN 1976      570
 ISSUE:         WATLR QUAL/GROUND
 PREDICTION:    ELIMINATION OF GPOUNDWATER CONTAMINATION
 FINDINGS:      MANY SEPTIC TANKS  REMOVED BUT QUALITY OF GROUNDWATER CAM NOT Be QUANTIFIED.


 MORE FINDINGS:



HOWELL               HOWFLL.CITY OF                     LIVINGSTON           MI SAGINAW RIVER BASIN 1976      571
 ISSUE:         WATER QUAL/SURFACc
 PREDICTION:    ENHANCEMENT OF WATER QUALITY IN THE HOWELL AREA
 FINDINGS:      AS PREDICTED
 MORE FINDINGS:  TOWNSHIP O^INS TO TH(- SOUTH BRANCH OF THE SIAWASSEE RIVFR.

-------
 C6AUG87


 CITY
   CONCLUSION NOW WOULD BE PREMATURE
        CFY RIV2R BASIN)
                                                              ST RIVER BASIN
      GSANTEL                             COUNTY
 TH?  RIVER HERE IS CLASSIFIED AS FULL CONTACT RECREATIONAL.
 ALL  WORK WAS  COMPLETED EXCEPT POR THE NORTH SIDE OF  THOMPSON  LAKE.
—j.	
      HPE:<»,CITY OF                     LAPEER                MI  SAGINAW RIVER BASIN 1976
 WATER iJUAL/GROUNO
 HIMINATIJN OF POLLUTION TO GROUNDWATER BY REMOVING  SEPTIC  TANKS.
 NO IMPROVEMENTS MADE.  AREA NOT SEWERED AS PLANNED.
                                                                                     NEPA(YR)
LAPEER
 ISSUE:
 PREDICTION:
 FINDINGS:
                                                                                                              572
 MORE FINDINGS:
TOWNSHIPS WERE NOT SEWERED NOR WERE CITY  SEWER  LINES  REPAIRED AS PROPOSED IN THE PROJECT.
PLANT WAS PERFORMED.
                                                                                            UPGRADE OF
COON VALLEY
 ISSUE:
 PREDICTION:
 FINDINGS:
 MOR; FINDINGS;
                                                        VERNON
                                                              WI UPPER MISSISSIPPI   1981
                                                                                               573
     COON VALLEY MUNICIPAL  WWTP
FLOCTPLAINS
WILL RF.aui'J FILL  oa DIKES  TO  PROTECT  SITE  ABOVE  TH; REGIONAL FLOOD; FILL WON'T AFFECT FLOOD ELEV.
TH; FUS: W43 3ASCD ON  *3C LOCATED  AT OLD  PLANT  SITE  IN FLOOCPLAIN. NEW PLANT WAS BUILT UPLAND.
IN DROrP TO &VOIO  THE  FLOODPLAIN LOCATION.  OLD  PLANT IN FLOOOPLAIN HAS NOW BEEN ABANDONNEO.THE CURRENT
MIUIMU* ELEVATION  OF ACTUAL SIT£ IS ABOVE  9«  FT VILLAGE DATUM OR M03E THAN 3 FT OVER FLOOOPLAIN
FN3i was 3A5?a CM  sac  PLAN  TO  e^ LOCATED  AT FLOOOPLAIN SITE OF OLD PLANT. STATE WOULD NOT APPROVE
ORIGINAL PLA'I WITH FLOOOPLAIN  SITE. UPLANC  SITE OF  NFW PLANT HAD NO NEGATIVE FLOOOPLAIN IMPACTS  «•
SLLOW'O OLD CLOUDPLAIN PLANT TO  Be  ELIMINATED.
TOLEDO
 ISSUE:
 PREDICTION:
 FINDINGS!
     TQL=PI,C:TY OF u=n MILE
                                         LUCAS
                                                               OH  MAUMEE  RIVER BASIN  1977
                                                                                               574
 MORE FINDINGS:
TOLEDO
 issut:
 PREDICTION:
 FINDINGS:
     TOL^OOiC.TY OF  C3AYVT7W)
                                         LUCAS
                                                              OH NAU^Et RIVER BASIN  1983
                                                                                                              575
                NONE OF THE CQN5TKUCTION  ACTIVITIES  AT THH  8AYVIEW  PLANT  SHOULD HAVE A SIGNIFICANT IMPACT ON BIOTA.
                NO riV?SlFICATlON OF FISH SPECIES HAS RcEN  NGTFO.NC  REPORTS  WERE AVAILABLE TO SUPPORT OR REFUTE CLAIM.
 MORE  FINDINGS:  IMPACTS OH PIOTA COULD NOT f- CONFIRMED.
                CHIEF ENGINES BELIEVES POSITIVE IMPACT OF PROJECT  ON  BIOTA.
RUSHFCRD
 ISSUE:
 PREDICTIONS
 FINDINGS:
                                         FILLMOPc
                                                               MN  UPPER  MISSISSIPPI
     RUSHFORO.CITY OF
BIOTA/AQUATIC
IMPROVED DISCHARGE TC  THE  POOT  RlVER  WILL  POTENTIALLY IMPROVE AQUATIC HABITATS.
NO EVALUATION MAO^ AT  THIS  TIME.
                                                                                                     1983
                                                                                              576
 MORE  FINDINGS:
BRUCE
 ISSUES
 PREDICTIONS
                                                         RUSK
                                                              WI UPPER MISSISSIPPI
      BRUCE.VILLAGE CF
 BIOTA/AQUATIC
 IMPROVED WATCR QUALITY WlLL SIGNIF 1CANTLV  IMPROVE  AQUATIC  LIFE  IN  CHIPPEMA  RIVER
                                                                                     1983
                                                                                               577

-------
 C6AUG8T
 cm
  FINDINGS:
   CONCLUSION  NOW  WOULD  Bt  PRtMATURE
        <6T  RIVeR  BASIN)

     GPANTEt                             COUNTY
NC CURRENT FISH  OR  BENTMIC  SURVEYS CONDUCTED.
                                                                              ST RIVER BASIN
                                                                                     NEPACVR)
  MORE  FINDINGS:
 COON  VALLEY
  ISSUE:
  PREDICTION:
  FINDINGS:
                                                         VERNON
                                                              WI UPPER MISSISSIPPI
                                                                                                      1981
                                                                                              578
     COON VALLEY MUNICIPAL WWTP
BIOTA/AQUATIC
TREATMENT SVS WILL BENEFIT WATER  QUALITY  BUT  NOT  CHANGE  STREAM FROM CLASS III TO CLASS II TROUT  STR
       II BROWN TROUT STREAM  AT  PLANT  OUTFALL,  MO HCTICAPLf CHANGE IN POPULATIONS DUE TO NEW OUTFALL.
 MORE FINDINGS:  TH?  OPERATOR  AND  STATE  AREA  ENGINEER NOTE THAT THE ELIMINATION OF  EXCESSIVE  EFFLUENT  LOADS HAS
                 ELIMINATED  EXCESS NUTRIENTS  AT OLD SITE. THEY HAVE NOTICED NO DETERIORATION  AT  NEW  OUTFALL.
COON VALLEY
 ISSUE:
 PREDICTION:
 FINDINGS:
                                         VERNON
                                                              WI  UPPER MISSISSIPPI
                                                                                                      1981
                                                                                               579
               COON VALLEY MUNICIPAL  WWTP
          3IOTA/TER
          EXISTING SIT?  IN LAWN, WILD GRASSES  *  WEEDS.  RESEEDING » LANDSCAPING OF AREA WILL FOLLOW  CONSTRUCTION.
          ACTUAL SIT? COR NCW  PLANT  is ON  FOTMER CROPLAND.OLD PLANT APANOONNEO BUT SITE NOT YET LANDSCAPED.
          WILD GFASSEj « W6SOS  8Y OLD PLANT  HOT  DISTURBED.  SOME RESIDENT WATERFOWL BY NEW OUTFALL * ON  LAGOONS.
FORT WAYNE
 ISSUE:
 PREDICTION:
 FINDINGS:
MORE FINDINGS; PUILDIHG AT THE OLD  SITE,  NEAR  THE  RIVCR,WOULD HAVE DISTRIBUTED SOME WILD GRASSES t MAY HAVE  AFFECTED
               WILDLIFE FSQM NCAP8Y  WETLAND. NLW  SITE  ^S  HAD MAJOR IMPACT ON CROPLAND. LITTLE WILDLIFE  AFFECTED.
               PLANT CPF3ATOS NOTICED (1C  C H4UGE -S I >JC E  3 PC PAT IONS BEGAN. WILDFOWL DOMINANT.

                                                                                                              580
                                         ALLEN
                                                              IN MAUMEE RIVER BASIN  1983
               FOi?T WAYNE,CITy OF (StWERS)
          SDCIO/POP
          THE INITIAL POPULATION TO  BE  S?FV<;D  BY  THE  PPOJHCT  is m.soo.DESIGNED FOR 159,385 IN THE YEAR  2000.
          THE POPULATION PREDICTION  WAS ACCURATE.
          GP.OWTH RATE MAS DECREASED  TO  ALMOST  ZERO  IN THE  PcPIOD FROM 1980 TO 1984.
          CAPACITY CF S-.WCRS NOT SUFFICIENT  TO P
-------
 06AUG67
 em


 CRID<:RSVILLE
  ISSUE:
  PREDICTION!
  FINDINGS:
    CONCLUSION NOW WOULD BE
         
-------
06AUG87



CITY


 MOKE FINDINGS:
CONCLUSION MOW WOULD &c PREMATURE
     
-------
C6AUGP7
CITY
 ISSUE:
 PREDICTION:
 FINDINGS:
 MOPE FINDINGS:
   CONCLUSION NOW WOULD BE  PREMATURE
        PECICTnN  ISCAj  OF  THE  FIRST  5  Y-.4RS)  TOO HIGH FOP -THE 5 YRS. THE AVG INCREASE HAS  BEEN  0.9%/VR.
WESTON
 ISSUE:
 PREDICTION:
 FTUOING3:
                                        WOOD
                                                              OH  MAUMEE  RIVER  BASIN  1979
                                                                                              598
                 W=3TOM,VILLAGE OF
            SOCIO/SECOcV
            AGRICULTURAL LAND WITHIN  AND  ARQUNO  W6STON  WILL  BE  DCV=LOPEO AS THE POPULATION t HOUSING DEMAND INC.
            NO IMOUSTRUL/COMMraCIAL  DEVELOPMENT  HAS OCCURRED  TO  INCREASE THE RESIDENCY OF WESTON.
            ONLY ONE NrW H3HE IS  3EI«JG  BUILT TO  BE  ADDED  TO  TH:  SEW2R  LINE t THIS IS WITHIN THE PREV. RESIO. IONE,
            THERE HAVE BE'N NO LAND USE CHANGES.
E FINDINGS: «T THIS TIME, NO POPULATION GROWTH OR  NEW HOUSING  DEMAND EXIST.
            FUTURE DEMAND WILL bE  THc ONLY  WAY TO  VERIFY  WHETHER  AGRICULTURAL LAND WILL BE THAT TAKEN OUT OF USE.
ROCHESTER
 ISSUE:
 PREDICTION:
 FINDINGS:
     ROCHcSTER.CITY OF                  OLMST=D
SOCIO/POP
RATE OF PROJECTED POPULATION GROWTH  IS 2t  PER  YEAR.
POPULATION GROWTH IS SLIGHTLY LESS THAN It  PER YEAR.
POPULATION ESTIHATE=60o206 FOR YEAR  1984.
                                                              MN  UPPER  MISSISSIPPI    1978
                                                                                              599
 HORE FINDINGS: POPULATION GPOHTH  IS  SLOWER  THAN  PREDICTED.THE CURRENT RATE IS It PER YEAR,

-------
C6AUC87


CITY
 ALMA
  ISSUE:
  PREDICTION:
  FINDINGS:
  MORE  FINDINGS:
                  CONCLUSION  NOW  WOULD BE  PPEMATURE
                        (BY  RIVER  BASIN)
                                                                             ST RIVER BASIN
      GRANT?!;                             COUNTY
 THE  PREDICTED GROWTH RATE  WAS 2T PER YEAR.
 THIS 1984 POPULATION ESTIMATE IS 60,206 (LATEST REVISED INFORMATION).
                                                                                     NEPACYIO
                                                                             UI UPPER MISSISSIPPI   1983
                                                                                                              600
      ALMA  MUNICIPAL WASTEWATER TRMT PLT BUFFALO
 SOCIO/POP
 THE  POPULATION WILL REMAIN RELATIVELY STABLE THROUGH THE YEAR 200C WITH A GROWTH RATE OF  ALMOST OX.
.CITY  OFFICIALS CITED THE  CURRENT POPULATION AS APPROXIMATELY 800.
 0£CR?ASfc OF  149 FROM YEAR 1977.

 IT WOULD APP.EAR THAT THE  POPULATION PREDICTED IN THE DOCUMENTS MAS TOO HIGH.
 IT IS  DIFFICULT TO  ASSESS THE  ACCURACY OF THE PREDICTION DUE TO THE DISCREPANCIES BETWEEN THE  SOURCES.
 Ti'r C;TY OFFICIALS  ATTRIBUTED  THf 1977 FIGURE OF 948 TO CONSTRUCTION IN THE AREA AT THAT  TIME.
BANGPR
 ISSUE:
 PREDICTION:
 FINDINGS:
                                                        LACROSSE
                                                                             WI UPPER MISSISSIPPI
                                                                                     1978
     liANGC» .VILLAGE OF
SCCIO/POP
TM= NFW ^ACUITY WILL ALLOW FOR GROWTH  IN  THE  AREA.  POP  GRWTH  PROJECTED AT o.sx PER YEAR
CUPR6NT POPULATION ESTIMATED BY VILLAGE  IS  110*.
601
 MORE FINDINGS: ?ASEO  ON  POP  PROJECTION,  VILLAGE  POP SHOULD BE ABOUT locc IN i985. ACTUAL POP is ABOUT lot ABOVE  THAT,
                MAINLY «?CAUS:  OF  NEW  DEVELOPMENT ON SEWtR EXTENSION SINC? PLANT OP5NED IN 1980
BARRON
 ISSUE:
 PPFOICTION:
 FINDINGS:
     BARRON.CITY OF
                                         BARRON
                                                                             WI UPPER MISSISSIPPI   1980
               SLIGHT POSITIV:  AFFECT  ON  EMPLOYMENT,  POPULATION GROWTH OF 2.H PER YEAR
               ^CONOPIC TRENDS  SHOW  NO INCREASE  IN  JOSS  FROM 1982 TO 1983.
               POPULATION  IN 8ARRPN  INCREASED  1.1 PERCENT  SINCE 1970 AND 1.7 PERCENT SINCE 1977.
               WAST'WAT'R  PLOW  IS C.678 MGO  OR 48 FJRCrNT  OF DESIGN.
MORE FINDINGS: AS pstoiCTro G»OWTH HAS NOT OCCU^ED  cus  TO  PLANT.
               «ATc OF POPUL4TI3N GROWTH  IS  SLOWER  THAN  £XP=CT=D.
602
PAPFON
 ISSUE:
 PREDICTION:
 FINDINGS:
                    bAP.RCN.CITY OF
               SOCIO/USERCHG
                                         BARRON
                                                              WI  UPPER  MISSISSIPPI
                                                                                     1980
603
 MORE FINDINGS:
BIRCHWOCO
 ISSUE:
 PREDICTION:
 FINDINGS:
                                                        WASHBU9N
     CIRCHWCOO.VILLAGH  OF
SOCIO/SECOFV
GROWTH OF  3.9? PEF  Y=AR
N£W PLANT  FLOW AVG.  WAS  39iOOO  &PD.  THIS  IS LtSS THAN 1982 FLOW.
1982 FLOW  = 410CC GPO;  19T2-198C  FLOW =  42CCO GPO.
                                                                             WI UPPER MISSISSIPPI
 MOPE FINDINGS: PPOJFCT HAS NOT CAUSED  INCREASED  WASTEWATER  FLOW.
                                                                                     1982
604
BRUCE
 ISSUE:
 PREDICTION:
                                                        RUSK
                    6RUC5,VILLAGE OF
               SOCIO/POP
               PTOJECTED YR. 20OC POPULATION WILL  B£  1,001  (DESIGN  CAP4CITY=l,260)
                                                              WI UPPER MISSISSIPPI   198}
                                                                                              60S

-------
T6AUG87
CITV
 FINDINGS:
                  CONCLUSION NOW WOULD BE
                       (?Y PIVeR BASIN)

                    GPANTEC
               ACTUAL I960 POPULATION IS
                                                       COUNTY
                                                              ST  RIVER BASIN
                                                                                     NEPA(VR)
 MORE FINDINGS: ALTHOUGH AN ACTUAL  VR  2000  POPUL.  is  OBVIOUSLY  NOT  AVAILABLE, THE PROJECTED RATE OF INCREASE HAS MUCH
                HIGHER THAN IS ACTUALLY OCCURRING.
PUTTHRNUT
 ISSUE:
 PREDICTION:
 FINDINGS:
    ' FINDINGS:
                    eUTTh»UUT.VILLAGE OF               ASHLAND
               SOC.IO/SMPLOY
               PROJECT MAY RCSULT IN INCREASED EMPLOYMENT.
               POPULAT10N UNKNOWN.  ASHLAND LUM°E<> HAS LEFT TOWN.
               FLOW IS HIGHER BUT INDUSTRY HAS L^T.
                                                                             WI  UPPER MISSISSIPPI   1981
                                                                                                              606
                    flUTT :Rl!UT,V ILLAG: OF               ASHLAND
ISSUE:          SOC10/POP
PREDICTIJN:    POPULATION GROWTH  RATS WILL  BE j.s  p^RChNT  PER  YP.
FINOINGS:       NO AVAILA3LE OATi  ON CURRENT POPULATION.
               flVv. WW FLOW WAS -J.22 "GO. HIGHER FLOWS MAY  BE  DUE  TC  I/I.
                                                                              WI UPPER MISSISSIPPI
                                                                                                     19B1
                                                                                                             607
 MORE FINDINGS; POPULATION UNKNOWN
COON VALLEY
 ISSUE:
 PREDICTION:
 FINDINGS:
                                                       VSRNON
                                                                             WI  UPPER MISSISSIPPI
                                                                                     1981
                                                                                              608
     COON ViLL":Y MUNICIPAL  WWTP
SOCIO/LANDUS:
•iRTWTM :s EXP:CTCO TO  a*: WITHIN THE VILLAGE...  ADJACENT  TO  USH n, AND 6i » EAST OF HIAWATHA STREET
NO SIGNIFICANT DEVELOPMENT  OR SECONDARY  LAND  USE  CHANGES IN COON VALLEY SINCE NEW PLANT OPENED.
THE SbUSS EXTENSION "?AN W4S LIFTED JUST  BHFORc  THE  PLANT OPENED.
 MORE FINDINGS: NO SIGNIFICANT  osowrn  OR  SUBSTANTIAL  LAHO  USF  CHANGES  SINCE PLANT B=GAN OPERATIONS OR SEW?:R EXTENSION
                SAN wii L:FT=D.
COON VALLrY
 ISSUE:
 PREDICTION:
 FINDINGS:
                                                       VEPNON
                                                                             WI  UPPER  MISSISSIPPI
                                                                                     1981
                                                                                                             609
     COON VALL:Y MUNICIPAL  WWTP
SOCIO/PQP
GROWTH IS EXPECTED TO  « WITHIN THE VILLAGE...CDON  VALLEY  ANTICIPATES A POPULATION INCREASE OF 1.5t tR
1980 POPULATION WAS  74C . NO  SIG GROWTH OR  DEVELOPMENT  IN  COON  VALLEY SINCE PLANT OPENED.
PLANT BEGAN OPERATIONS IN 1982.
 MORE FINDINGS: POPULATION  IS  Hi  £XP?CT£0  IN  FNSI  *  FACILITIES  PLAN,BUT NO SUBSTANTIAL SEWER EXTENSIONS OR DEVELOPMENT
                HAVE TAKEN  PLACE  IN  COON VALLEY  SINCE  THE  PLANT  BEGAN OPERATIONS.. WITHOUT THE NEW PLANT, THE VILLAGE
                WOULD HAV=  B6£N UNOiR  A SEWER EXTENSION  MORATORIUM  IMPOSED BY THE STATE.
CORNELL
 ISSUE:
 PREDICTION:
 FINDINGS?
                                                       CHIPPtWA
                                                                             WI  UPPER  MISSISSIPPI   1983
                                                                                                              610
     CORNELL,CITY OF
SOCIO/POP
95? OF 2003 POPULATION TO 3£ SEWERED.  I.It POPULATION  INCREASE/YR.POPULATION IN 2000 TO EQUAL 1,870.
POPULATION=1659. 97X OF POPULATION  S"W=RED,  558  UStRS.
MORE FINDINGS: ALL BUT
                            OF  THE  POPULATION  is  HOOKED  UP  TO  THE  STSTEM.  POPULATION PROJECTION MSS a LITTLE S.OM

-------
 06AUG87
 CITT
   CONCLUSION NOW WOULD B = PREMATURE
        (?Y 
-------
''6AUG87


CITY

 MOR? FINDINGS:
                   CONCLUSION  NOW WCULO Zi  PREMATURE
                        (f.V  ?IVCR BASIN)
                                                         COUNTY
ST RIVER BASIN
NEPA(YR)
STRUM                 STPUM.VILLAGE  CF                   TR=MPEALEAU           WI  UPPER MISSISSIPPI   1980     617
 ISSUC:         SCCIO/EMPLCY
 PREDICTION:    THE PROJECT  MIGHT  RESULT in INCREASED EMPLOYMENT DUE  TO  NORMAL  POPULATION AND ECONOMIC GROWTH
 FINDINGS:      EMPLOYMENT  EFFECTS  COULD NOT BE VERIFIED.


 MORE FINDINGS: nc  SIGNIFICANT  CHANGE NOT?O IUT -MY HAVT OCCURRED.
                HOMEVb-,  THt^E  IS  S'OME INCONSISTENCY IM TH* T t £L SCWHE SE.  GROWTH  WAS  SPECIFICALLY NOT PREDICTED.
                MO  INCRiiSr  IN  EMPLCYMr'iT HAS OCCU"i??D.

STPUM                 STFU.'I,VILLAGE  OF                   TR = MP«:AL = AU           WI  UPP6R MISSISSIPPI   1980     618
 ISSIJE:         sccio/rop
 pRtOiCTion:    TH= POPULATION  WILL c?ow AT » P-TI OF 1.3 PERC^MT  AIINUALLV  THROUGH  THE YEAR 2000
 F:ND:MGS:      TH; CUPP = MT  POPULATION :i 1066.  i'i UTT IT WAS m*.


 MPRT  FINDINGS: POPULATION  G?OUTH  aeove i.?% HAS NOT B?LN A RESULT OF PLANT  EXPANSION



W^STTY                W = STSY  5i:WAr,j  TREATMENT PLANT      V~RN3N                WI  UPPER MISSISSIPPI   1979     619
 ISSUE:         sccio/fop
 pp = oiCTi3Nt    PR-OICTI-D  ?:o;  WGTBY POPULATION i-i Y? 2Ci3;i9ia POPULATION  IN  VP i985:onsrr,N POP EQUIV. AT  2500.
 FINDINGS:      i^ss  POPIJL»TUN i;  19?-1.


 MOR=  FINDINGS: 19J5  ropuL«TioN OF  1990 is 72 P'.OPL-: MDR= THAN PREDICTED.



CASS                  5iG!r(»W COUNTY WTP                 TUSCOLA               MI  SAGINAW RIV6R BASIN 1977     620
 ISSUE:         SOCIO/rMPLTY
 PREDICTION:
 FINDINGS:      A  LOCAL  t'JPUS'"! Y 'iNCRE ASF 0 ITS HOPR FO'CE BY 5FVERAL  HUNDRED
                ^'OPLE  AS  a  S/.SULT  OP TH:E PLANT EXPANSION.

 MORE  FINDINGS:



CAS3                  SAGINAW COUNTY WTP                 TUSCOLA               Hi  SAGINAW PIVER BASIN 1977     621
 ISSUE:         SOCIO/SECO=V
 PREDICTION:    DCVELOPMENT WDULO  NOT "-. INDUCED.
 FINDINGS:      TH? PLANT  EXPANSION HAS RESULTED IN LIMITED PESIOENTIAL  GROWTH
                stio INOUST»I»L  EXPANSION.

 MORE  FINDINGS:


^^ ^ ^ ^ .^ ^ M ^ ^ ^^™,^^^«»«»^^«"^^^^^ »^^^ •* *B^ ^••^^^^^^^^••™»^™ ^^ v « ^^^ ^^im •>«>«a«>^^«»^^^^,»«B.>^^^^^«>^^^«B^^^^^v>«i^«9 «•«*«•«•
TITT4B«,WtSS6^ >WP     •* I TTd<>AWA SS Ei  TWP WWTP             i
-------
06AUG87
CITY
  ISSUE:
  PREDICTION:
  FINDINGS:
   CONCLUSION NOW WOULD BE  PREMATURE
        cer RIVER BASIN)

     GRANTEE                             COUNTY
SOCIO/POP
OESIGN POPULATION FOR  THE YEAR  2000 WILL 8=  5800.
1985 POPULATION  IS  l
-------
06AUG87
CITY
                  CONCLUSION NOW MOULD  BE  PREMATURE
                       <3Y RIVER BASIN)

                    GRANTED                             COUNTY               ST RIVER BASIN         NEPACVR)
               BUT LITTLE EXCAVATION  ON NEW  LAND.ACTUAL SITE INCL EXCAVATION ON SURFACE AREA 2.7 ACRES, BUILDING UP
               LOWER SIDE OP SITE t ACCESS ROAD,  6  BUILDING CULVERT.MINOR GULLYING PERSISTS AS RESULT OF CONSTRUCTION
HOWELL
  ISSUE:
  PREDICTION:
  FINDINGS:
 MOPE FINDINGS:
                    HOWELL,CITY OF
               PHVS tNV
                                                         LIVINGSTON
                     MI  SAGINAW  RIVER  BASIN  1976
               SANITARY SEWrRS WERE  NOT  CONSTRUCTED  IN  MARION AND GcNOA TOWNSHIPS, NOR
               GN THE IJ03THSIOE 0* LAKE  THOMPSON.  STREAM CHANNELIZATION OCCURRED TO
               .ENHANSE W4TER FLOW IN  STREAM.
                                628
ALMA
 ISSUE:
 PREDICTION:
 FINDINGS:
                    ALMA MUNICIPAL WASTEWATER  TRMT  PLT  BUFFALO
               OTHER/P5CREATION
               RECREATION WILL IMPROVE DOWNSTREAM  DUE  TO IMPROVED WAT=R QUALITY.
               TH^RE HAS "if.1* NO KNOWN IMPACT  CN RcCREATION  AS A  RESULT OF THIS PROJECT.
                     WI UPPER  MISSISSIPPI    1980
                                                                                                               629
MOR = FINDINGS: RECREATION WAS NOT
                                              CUE  TO THE PROJECT, ;VEN THOUGH WATER QUALITY DID  IMPROVE.
COOM VALLEY
 ISSUt:
 PR30:CTION
 FINDINGS:
 MOR€
r»OODHC'£
 ISSUE:
 PREDICTION:
 FINDINGS:
                                                        VERNON
                     WI UPPER  MISSISSIPPI
                        1981
                                                                                               630
     COCN VuLL^Y MUNICIPAL WWTP
CULTURAL .^SDU'CE
110 ARCHAEOLOGICAL 0iSOURCiS TllftT SHOULD  «;  INCLUDED ON NAT.REG.OF HIST.PLACES FOR COON VALLEY  PROJ.ARS
STctiu CHiPSt APC.OWHEAOS<:T OBJECTS)WER=  FOUND ASOUT sc FT  DOWNHILL FROM LAGOONS.
ST4TC H1ST3BIC SC1CIETY MADE SITE HISTORIC  PLACE  IN 118 2. MAT ERIAL US = D TO RAISE LOWER SIDE  OF
LAiiC3MS Mftt HAVt COVERED SOM= OF THE  OQCUMtNTED  SITE
T*: 1S81 FNJI ASSU^rO OLD PLANT  SITi  WOULO  BE USED. 27 STONE OBJECTS WERE FOUND IN STUDY OF ACTUAL
SIT£,AtlO IIT: WAS L!ST?0 BY STATE  IN  RcG.OF  H1ST.PLACES.SOME ADDITIONAL OBJECTS MAY HAVE BEEN  FURTHER
COVERED DURING CONSTRUCTION, BUT NO NOTABLE  OBJECTS U:RE  DUG UP IN CONSTRUCTION.
                    GCC-OHUi.CITY OF
               SOLID HAST=
GOCOHUc
MN UPP6R MISSISSIPPI
               SLUDGE IS LANi) APPLIED  ON  SURROUNDIMG  AGRICULTURAL FIELDS.
                                                                                     19B2
                                                                                              631
 MORE FINDINGS:
COON VALLEY
 ISSUE:
 PREDICTION:
 FINDINGS:
                                                        VERNON
                     WI UPPER  MISSISSIPPI
                       1981
                                                                                                             632
     COON VJLL?Y MUNICIPAL WWTP
SOLID WASTE
AG LAND USE FOR SLUDGE DISPOSAL  WILL  BE  AFFECTED  BY  SPREADING TECHNIQUES...MAY AFFECT GROUNDWATER.
NiW LAGOONS HAVE HOT YET BEEN CLEANED  I  SO  HAVE PRODUCED NO SOLID WASTE OR SLUDGE TO DATE.
VILLAGE HAS AN APPROVED SLUDGE SPREADING  SIT=  WHEN NECESSARY FOR FUTURE USE.
 MORE FINDINGS: AERATED LAGJONS  PRODUCE  NO  SLUDGE.  THEY MAY MEED TO BE DREDGED IN THE FUTURE, BUT VILLAGE  ALREADY  HAS
                APPROVED SIT£S FOR  FUTURE MATERIAL
 FOUNTAIN CITY
  ISSUE:
  PREDICTION?
                    FOUNTAIN CITY,CITY OF
               SOLID WASTF.
SUFFALO
WI UPPER MISSISSIPPI   1979
                                                                                              633

-------
 C6AUG87
CONCLUSION NOW WOULD 8E PREMATURE
     (BY RIVcR BASIN)
 CITY                 GRANTEE                            COUNTY               ST RIVER BASIN         NEPACVR)
  FINDINGS:      SLUDGE DIGESTER AGITATED i HR/OAV.LANO APPLIED IN SPRING TO FARM GROWING CORN t SOYBEAN FOR FEED.
                30 T/YR SLUDGE GENERATION RATE.

  MORE FINDINGS: NO PREDICTION MADE.



 HOLLY                OAKLAND COUNTY DPW                 OAKLAND              MI SAGINAW RIVER BASIN 1977     634
  ISSUE:         SOLID WASTE
  PREDICTION:    NO ADVERSE IMPACTS our TO SLUDGE AND SPOIL DISPOSAL.  SPOIL USED AS LANDSCAPE.
  FINDINGS:      KLUDGE STORID ON-SITE IN A 320tOOO GAL TANK.  SPOIL USED AS BERM FOR LANDSCAPE.


  MORE FINDINGS:



 HARROD               H&RROD,VILLAGE OF                  ALLEN                OH MAUMEE RIVER BASIN  1977     635
  ISSUE:         ENERGY
 PREDICTION:
 FINDINGS:      START-UP PROBLEMS. PLANT MIT BY LIGHTNING. ELECTRIC COST OVER EST. BUDGET.
                COSTS ARE »30J-»600/MONTH, HAV6 BEEN OVfcR *600.

 MORE FINDINGS: ELECTRICAL CTSTS OV-R BUDGET.



KALIDA               KALIDA,VILLAGE OF                  PUTNAM               OH MAUMEE RIVER BASIN  1976     636
 ISSUE:         ENERGY
 PREDICTION:    i«9,soo KHH ANNUAL ELECTRICAL use.
 FINDINGS:      ELFCTRIC USF. FOR ONE Y?AR IS ABOUT 17,200.


 MORE FINDINGS: DATA COULD LOT BE OBTAINED OP "ESTIMATED.



UNIOPCLIS            UNIOPOLIS.VILLAGE CF               AUGLAIZE             OH MAUMEE RIVER BASIN  1977     637
 ISSUE:         ENERGY
 PREDICTION:
 FINDINGS:      ELECTRICAL COSTS FOR PLANT RANGE FROM $S/OAY TO ti3/DAV IN i985.(ORiG.auoG.UNAVAILABLE).

                                                                               \
 MORE FINDINGS: COSTS ARF ie TO »13 PER DAY FOR ELECTRICITY IN 1985. NO IMPACTS WERE PREDICTED.



BARRON               BARRON,CITY OF                     BARRON               WI UPPER MISSISSIPPI   I960     638
 ISSUE:         ENERGY
 PREDICTION:
 FINDINGS:      POWER COST NOT SHOWN, BUT RATE IS 3.7 CENTS/KU-HR.
 MORE FINDINGS: POWER COST MAY ee LESS THAN PREDICTED BASED ON PER KW-HR COST.

-------
 C6AUG8T
CITY
                   CONCLUSION NOW MOULD Be PREMATURE
                        (f>Y 9IVER BASIN)


                     GPANTEi
                                                        COUNTY


                                                        WASH9URN
ST RIVER BASIN         NEPA(VR)


WI UPPER MISSISSIPPI   1982     639
 BIPCHWOOO            BIRCHWGOD.VILLAGE OF
  ISSUE;         =nfRGY
  PREDICTION:    POWER HILL BE USED.
  FINDINGS:      NEW PLtNT. CANNOT DETERMINE POWER USE FROM DATA
  MORE FINDINGS: PLANT WENT ON-LINE IN LATE 1984. NO POWER COST DATA AVAILABLE.
                POWER USE A3 EXPECTED ACCORDING TO OPERATOR.
                                                        RUSK
                                                                             WI UPPER MISSISSIPPI    1983
BRUCE                RPUCE,VILLAGE OF
 ISSUE:         ENERGY
 PREDICTION:     MAPGIHAL INCRLASB IN RESOURCES USED CURING CONSTRUCTION AND ENERGY USE LONG-TERM FOR EQUIPMENT
 FINDINGS:       199* TOTAL POWrK CTST WAS »6,659.C6tTOTAL POWER USAGE NOT AVAILABLE IN SUMMARY FORM.
                                640
 HOPE FINDINGS: NO PSE-CONST WAS LDHL« IN EN;OGY USE THAN THE ORIGINALLY PROPOSED ACTIVATED  SLUDGE  PLANT.  BOTH  HIGHER  THAN  OLD
                PUNT.
PHILLIPS             PHILLIPS,CITY OF                   PRICE                WI UPPER MISSISSIPPI    1983
 ISSUE:         ENERGY
 PREDICTION:
 FINDINGS:      USER CHARGES FOR QtM WERE ACCURATELY PREDICTED BY FACILITIES PLAN  AND NEPA  DOCUMENT.
                                                                                                              643
 MORE FINDINGS:
                                                        LAPEER
tAPESR               LAPSER.CITY Qf
 ISSUE:         ENERGY
 PREDICTIONS    THE PLANT WILL HAVE TWO POWER LINcS FOP 9600 KWH/OAy FOR FLOWS OF 4 MGO.
 FINDINGS:      TH: PLAUT DOES HAVE TWO POWER LINES FO
-------
06AUG87


CITY

 MORC  FINDINGS:
CONCLUSION NOW WOULD BE PREMATURE
     (P,Y RIVER BASIN)

  GRANT EC
                                                        COUNTY
                                                                              ST RIVER BASIN
                                                                                                    NEPAOR)
                                                         SAGINAW
                                                           HI  SAGINAU  RIVER  BASIN  1979
TITTABAWASSEP TWP    TITTAPAWASSEE TWP WMTP
 ISSUE:         PNCRGY
 PREDICTION:    ENERGY REQUIREMENTS WOULD BE LESS THAN THAT OF A COMPARABLE BIOLOGICAL UWTP.
 FINDINGS:       COULD NOT BC EVALUATED.
                                                                                                              645
 MORE  FIND INGSs
COON VALLEY
 ISSUE:
 PREDICTION:
 FINDINGS:
                                     VcRNON
                     COON VALLEY MUNICIPAL MWTP
                AIR QUALITY
                NO INCINERATION...ODORS MINIMIZED...EXHAUST FUMES DURING CONSTRUCTION
                STATE ENGINEER AND VILLAGE OPEPATOR SAY ODOR NEVER AN ISSUE.
                                                                              WI  UPPER MISSISSIPPI
                                                                                                     1981
                                                                                                              646
 MOP.E FINDINGS:  WINTER  CONDITIONS.  BUT  NO  EVIDENCE  OF  ODOR.  LAGOONS  ARE  AWAY FROM HOUSES,  so LESS CHANCE FOR COMPLAINT
                 THAU  WITH  THE  ORIGINALLY PROPOSED RBC  SYSTEM.
GOOOHUE
 ISSUE:
 PREDICTION:
 FINDINGS:
                                     GOODHUE
                                                                             MN UPPER MISSISSIPPI
                     GOOOHUE,CITY OF
                OTHER/PCCREATION
                IMPROVED  WATER QUALITY WOULD  ENHANSE  RECREATIONAL  OPPORTUNITIES  DOWNSTREAM.
                NOT DETERMINED IF DOWNSTREAM  RECREATION  IMPROVED.
1982
647
 MORE FINDINGS:
ROCHESTER
 ISSUE:
 PREDICTION:
 FINDINGS:
 MORE FINDINGS:
                                     OLMSTED
                                                                             MN UPPER MISSISSIPPI
                                                                                  1978
                     ROCHESTER,CITY OF
                OTHER/RECREATION
                DOWNSTREAM RECREATIONAL CAPABILITIES  WILL  BE  ENHANCED DUE  TO REDUCED POLLUTION IN THE STREAM.
                DATA WERE NUT AVAILABLE FOP  WATER  QUALITY.THEY  ARE  UNDER  REVIEW BY A CONSULTANT.
                IN TER'«S OF RcCRPATlONflL  ENHANCEMENT,HO  STUDIES HAVE  BEEN  CONDUCTED.
         648
                     OAKLAND COUNTY OPW
                OTHER/RtCREATIOH
                                     OAKLAND
                                                                             MI SAGINAU RIVER BASIN 1977
HOLLY
 ISSUE:
 PREDICTION:
 FINDINGS:      RtCRFATiONAL VILU;: OF  RIVERS  AND LAKES  IN  PLANNING  AREA  INCREASED
                BY IMPROVEMENTS IN SURFACE WATER QUALITY.   NO  IMPACT  INFORMATION IS AVAILABLE.
                                                                                           649
 HORE FINDINGS: PLANT is APPROXIMATELY 3  MILES  FROM  NEAREST  IMPOUNDMENT.

-------