PB97-964014
                                EPA/541/R-97/065
                                November 1997
EPA Superfund
      Record of Decision:
       Oak Ridge Reservation (USDOE)
       (Union Valley Upper East Fork
       Poplar Creek Characterization Area)
       Oak Ridge, TN
       7/10/1997

-------
                                     DOE/OR/02-1545&D2
                 Record of Decision
       for an Interim Action for Union Valley,
Upper East Fork Poplar Creek Characterization Area,
               Oak Ridge, Tennessee


-------
                                            DOE/OR/02-1545&D2
                  Record of Decision
       for an Interim Action for Union Valley,
Upper East Fork Poplar Creek Characterization Area,
                Oak Ridge, Tennessee
                  Date Issued—April 1997
                       Prepared by
                     Jacobs EM Team
                   125 Broadway Avenue
                   Oak Ridge, Tennessee
              under contract DE-AC05-93OR22028

                       Prepared for
                 U.S. Department of Energy
              Office of Environmental Management

-------
                          PREFACE
The Record of Decision for an Interim Action for Union Valley, Upper
East Fork Poplar Creek Characterization Area, Oak Ridge, Tennessee
(DOE/OR/02-1545&D2) was prepared in accordance with requirements
under the Comprehensive Environmental Response, Compensation, and
Liability  Act of 1980 and documents  the selected interim remedy.
This work  was  performed   under  Work   Breakdown   Structure
1.1.03.41.10.20.15.04 (Activity  Data Sheet 2303, "Upper East  Fork
Poplar Creek"). This document provides the Environmental Restoration
Program with information about the interim institutional controls remedy
selected for Union Valley.  Information in this document summarizes
information  from  the Administrative Record including the interim
proposed plan (DOE/OR/02-14S2&D2).

-------
                  ACRONYMS AND ABBREVIATIONS
ARAR
bgs
CA
CERCLA

DNAPL
DOE
EFPC
Energy Systems
EPA
ER
FFA
FS
ft
gal
km
L
Ib
m
MCL
NCP
ORR
PCE
ppb
RI
ROD
TCE
TDEC
UT
VOC
applicable or relevant and appropriate requirement
below ground surface
characterization area
Comprehensive Environmental Response, Compensation, and Liability
Act of 1980
dense nonaqueous-phase liquid
U.S. Department of Energy
East Fork Poplar Creek
Lockheed Martin Energy Systems
U.S. Environmental Protection Agency
environmental restoration
Federal Facility Agreement
feasibility study
foot
gallon
kilometer
liter
pound
meter
maximum contaminant level
National Oil  and Hazardous Substances Pollution Contingency Plan
Oak Ridge Reservation
tetrachloroethene
parts per billion
remedial investigation
record of decision
trichloroethene
Tennessee Department of Environment and Conservation
University of Tennessee
volatile organic compound
ITOXM96IO.IMA/MBH
                                        111
                                                                         Affi 29. 1977

-------
              UNITED STATES ENVIRONMENTAL PROTECTION AGENCY
                               REGION 4
                         ATLANTA FEDERAL CENTER
                          100 ALABAMA STREET. S.W.
                        ATLANTA, GEORGIA 30303-3104
4WD-FFB

Ms. Margaret Wilson
FFA Project Manager
Oak Ridge Remediation Management Group
Environmental Restoration Division
U.S. Department  of  Energy
Oak Ridge Operations
P.O. Box 2001
Oak Ridge, Tennessee  37831-8541

SUBJ:  UNION VALLEY
       RECORD OF DECISION (DOE/OR/02-1545&D2)
       OAK RIDGE RESERVATION, OAK RIDGE,  TENNESSEE

Dear Ms. Wilson:

    The purpose  of  this letter  is to notify you of the
Environmental Protection Agency's approval of the subject
document.  If you have any questions regarding this  letter,
please contact me directly at  (404)  562-8547 or leave me  a
message via Voice Mail at (404) 562-4300 Box # 2-8547.

                                 Sincerely,
                                 Victor L. Weeks
                                 K-25 & Y-12 Sites Project Manager
                                 Federal Facilities Branch
                                 Waste Management Division
cc:  Mr. Doug McCoy,  TDEC
     Ms. Pat Halsey,  DOE-OR
           Mcyctod/Ftecyctafato « PiM«d wMi VugiUtito Of B*Md kiks on 100% ftecycfed P«p«r (
-------
                  PART 1.  DECLARATION
/TOXMKI0.1MA/MBH                   '                           Aprt 29. 1997

-------
                      SITE NAME AND LOCATION

      U.S. Department of Energy
      Oak Ridge Reservation
      Union Valley
      Upper East Fork Poplar Creek Characterization Area
      Oak Ridge, Tennessee


               STATEMENT OF BASIS AND PURPOSE

      This record of decision (ROD) presents the selected interim remedial action for Union
Valley, a site adjacent to the U.S. Department of Energy (DOE) Oak Ridge Y-12 Plant on the
Oak Ridge Reservation (ORR) in Oak Ridge, Tennessee, and included in the scope of the Upper
East Fork Poplar Creek (EFPC) Characterization Area (CA).  The interim action was chosen in
accordance with the Comprehensive Environmental Response, Compensation, and Liability Act
of 1980 (CERCLA),  as amended by the Superfund Amendments  and Reauthorization Act 'of
1986, 42 United States Code Section 9601 et seq., and to the extent practicable, the National Oil
and Hazardous Substances Pollution Contingency Plan (NCP) (40 Code of Federal Regulations
300).

      The ROD is based on the administrative record for the Upper EFPC CA, which includes
an interim proposed plan for Union Valley (DOE 1996) and other documents in the administrative
record file for this site.
                 • *.                                                   •
      This document is issued by DOE as the lead agency for environmental restoration (ER)
activities on the ORR.  U.S. Environmental Protection Agency (EPA)-Region IV and the
Tennessee Department of Environment and Conservation (TDEC) are supportive agencies as
parties of the Federal Facility .Agreement (FFA) for this response action and concur with the
selected remedy.


                       ASSESSMENT OF THE SITE

      A carbon tetrachloride-dominated contamination plume originating under the Y-12 Plant
has been detected in the groundwater below privately owned land in Union Valley.  There are
no current users of the groundwater.  However,
                    »
nOKMM10.IMA/MBH                           1-2

-------
           %6bbmfiMted groundwater and a possibility that actions taken by property owners
           * tf.S f       f J *^ t   f         .• •" * 1      * f     .       j   J-  » *   •   *
could cause the contamination plume to expand.  Therefore, actual or thtebened releases of
                            *          •      f  v j f        t  fft  tf  '         f  f  f   t '
                   from the Y»12 Plant, if not addressed by implementing the interim lespoase
actioa selected m the KOD, may present a current or potential threat to public healtnV welfare,
             DESCRIPTION OF THE SELECTED REMEDY

      This response action fits into the overall ORR cleanup strategy by addressing ground water
contaminated with carbon tetrachloride in the Union Valley portion of the Upper EFPC CA. The
purposes of this interim action are to:

      •  ensure that public health is protected while final actions are being developed and.
          implemented and

      •  identify and, if necessary, prohibit future activities with a potential to accelerate the
          rate of contaminant migration from the CA or increase the extent of the contaminant
          plume.

      DOE has selected an institutional controls interim remedy for the site to accomplish these
goals.  The selected action consists of:

      •  license agreements with property owners notifying them of the potential contamination
          and requiring them to notify DOE of any changes in use of groundwater or surface
          water in certain areas and

      •  appropriate verification by DOE  of compliance with the agreements and notification
          of state and local agencies.

      No monitoring will be conducted as part of this ROD. Watershed management monitoring
by DOE outside the scope of this interim action and monitoring  by state agencies may provide
data on  Union Valley for use on future remediation decisions. The monitoring and the licensing
agreements  will provide, ,at a minimal cost,  institutional controls that help  ensure the site
continues to pose no unacceptable human health risk.
 /TOOOM6IO.IMA/MBH                             1-3                                 Afri ».

-------
                      STATUTORY DETERMINATIONS

      This interim action protects human health and the environment, complies with federal and
state requirements that are legally applicable or relevant and appropriate requirements (ARARs),
and is cost-effective. No ARARs are associated with this limited action.  This is a limited interim
action that does not use permanent solutions or  alternative treatment  (or resource recovery).
Because this action does not constitute the final remedy for Union Valley, the statutory preference
for remedies that reduce toxicity, mobility, or volume as a principal element will not be satisfied
by this interim action. Subsequent actions that address fully the principal threats in Union Valley
will be implemented for the Upper EFPC CA.
/TDOMWIO.IMA/MBH                            1-4                                 Jme 26. 1997

-------
                                 APPROVALS
4*^
James Hall, Manager
U.S. Department of Energy
Oak Ridge Operations Office
                                                     Date
Earl C. Leming, Direct**
 U.S. Department of Energy Oversight Division
 Tennessee Department of Environment and Conservation
                                                     Date
John Hankinson, Regional Administrator   V
U.S. Environmental Protection Agency, Region IV
                                                     Date
JTOXH96IO IMA/MBH
                                       1-5
                                                                          Afrt 29. 1997

-------
                                                                     1
                PART 2. DECISION SUMMARY
mOMMIO.IMA/MBH                                                April 29. 1997

-------
            SITE NAME, LOCATION, AND DESCRIPTION


      Union Valley lies east of the DOE Y-12 Plant  and  extends approximately 5.8 km
(3.6 miles) from Scarboro Road to Melton Lake Drive in the city of Oak Ridge, Tennessee
(Fig. 2.1). The valley is bounded by Pine Ridge to the north and Chestnut Ridge to the south.
Illinois Avenue transects the area 1 km (0.6 miles) east of Scarboro Road.  Union Valley Road
runs the length of the valley.  Most properties in the Union Valley corridor are privately owned
tracts of variable size, although the city of Oak Ridge and the University of Tennessee (UT) also
own land there.  The portion of the valley  that has contamination resulting from release at the
Y-12 Plant is included in the Upper EFPC CA.

      Following is a brief-description of several aspects of the site. More site description details
are found in the  Union Valley Interim Study Remedial Site Evaluation (ORNL 1995).

      Union Valley is within the city limits of Oak Ridge,  which has a population of 27,000.
Industrial, residential, and office  expansion of Oak Ridge has occurred in several directions,
including Union Valley.  Future growth in  the area is expected.

      The Maynardville Limestone bedrock unit underlying the Y-12 Plant and Union Valley
is of particular interest because it is  the primary  pathway for  contaminant migration from the
plant (ORNL 1995).  Contaminants  consistent with those found in the carbon tetrachloride-
dominated plume of contaminated groundwater originating under the Y-12 Plant were detected
in one of the six monitoring wells in the Maynardville Limestone in Union Valley and in two
springs that feed Scarboro Creek near Illinois Avenue.  Contamination detected in a shallow well
in Union  Valley may be connected with  a shallow plume of tetrachloroethene  (PCE) and
trichloroethene (TCE) originating at  the Y-12 Plant or may originate from a source in Union
Valley off ORR.  None of the current landowners in Union Valley extract groundwater for
residential use.


         SITE HISTORY AND ENFORCEMENT ACTIVITIES

      On November 21, 1989, EPA placed ORR on the National Priorities List under CERCLA.
On January 1, 1992, DOE, EPA, and TDEC implemented an FFA to provide a procedural
framework and schedule for evaluating, prioritizing, and managing areas of contamination on
ORR.  The agreement also specifies that  CERCLA procedures be followed to evaluate and
remediate contamination problems.

JTOOM96I0.1MA/MBH                            2-2                                Afrt »• ""

-------
               Approximate Location of
                Known Off-Site Plume
                                    Union Valley
                        UNION VALLEY ROAD
             to Knaxviilo
Oak Ridge Reservation
                                                    Union Valley location map


                                                   DOE • Urion \Mtoy - Oak Ridge. Temeasoe

-------
      The Y-12 Plant is one of three major plants at ORR.  Built in 1943, the plant served as
a research, development, and process facility in support of the Manhattan Project.  Uranium
isotopes were separated at the Y-12 Plant, which also provided manufacturing and developmental
engineering for nuclear weapons.  The Y-12 Plant's current mission is technology development
and weapons disassembly.

      A remedial investigation (RI)/feasibiliry study (FS) is currently underway for the Upper
EFPC CA.  The RI/FS report will develop long-range remedial alternatives that will address
contamination from the main area of the Y-12 Plant throughout the CA, including  Union Valley.
However, final remedial action for the CA is unlikely to occur within the next 4 years.  This
interim action is being taken to ensure that the public is protected from contaminants transported
by groundwater until final action is taken.  •

      The interim proposed plan evaluated potential interim actions in accordance with the
requirements of CERCLA and NCP. The proposed plan presented DOE's determination that the
institutional controls action is necessary and solicited public comment  on that determination.
                                                                                   •
Part 3 of this ROD, the "Responsiveness Summary," documents public comments and DOE's
response.  This ROD documents the selected interim remedy for Union  Valley.


           HIGHLIGHTS OF COMMUNITY PARTICIPATION


      The interim proposed plan was released for public comment August 5, 1996.  The notice
of the availability of the plan and other documents in the administrative record was published in
The Oak Ridger, The Knoxville News-Sentinel, and the Roane County News newspapers August 5,
1996. The administrative record file contains all the documentation DOE considered in selecting
the interim remedial action  for Union Valley and is available at the Information Resource Center,
105 Broadway Avenue, Oak Ridge, Tennessee 37830. A 30-day public comment period for the
proposed plan began August 6,  19%. On August 7, 1996, a public availability session was held
that included a presentation on Union Valley.  The public was informed that a public meeting
specific to Union Valley would be held,  if requested.   None was requested, and the public
comment period ended September 5, 1996.  Comments  recorded during the public availability
session  and written comments received from three organizations and one individual within the
public comment period are addressed in the "Responsiveness Summary" of this document.
mOMMIO.IMA/MBH                            2-4                                 April 29. 1997

-------
                  DOE ER PROGRAM AND SCOPE  OF
                  UNION VALLEY INTERIM ACTIONS


      The goals of the DOE ORR ER Program include achieving compliance with environmental
regulations that protect human health and the environment and reducing risks to human health and
the environment  resulting from contaminated, inactive,  DOE disposal sites or contaminant
releases.  Some of the operable units under the overall ER Program are on ORR but not within
the boundaries of the Y-12 Plant, Oak Ridge K-25 Site, or Oak Ridge National Laboratory. DOE
has adopted a watershed approach for remediation of ORR. A watershed is defined as a surface
drainage basin that includes one or more contaminated areas to be investigated. The Upper EFPC
CA is a watershed that includes most of the main Y-12 Plant and the full extent of the plume of
contaminated groundwater that has migrated off ORR and into Union Valley;

      This ROD addresses only the plume of contaminated groundwater that has migrated
beyond the Y-12 Plant boundaries.  Future CERCLA activities may be conducted at all or part
of the Upper EFPC CA in association with other interim, early, and final actions.  There may
be sources of contamination in Union Valley that do not originate from the Y-12 Plant.  This
interim remedial action is not intended to address other contamination sources.  However, the
selected interim remedy will mitigate potential human health risks, if any,  from any source of
groundwater contamination  in the Union Valley interim  remedial  action boundary.  The
responsibilities of DOE and TDEC to investigate other sources and mitigate any unacceptable
risks outside the scope of this action are discussed in "Site Characteristics," "Selected Remedy, "
and "Responsiveness Summary."


               SUMMARY OF SITE CHARACTERISTICS

      There are six groundwater monitoring wells  in Union Valley (three wells at different
depths in each of two locations).  Carbon tetrachloride has been detected in one of these wells
and at two springs near Illinois Avenue and the UT Arboretum. Several omer organic^ iaorganic*
                                   detected in tie groundwater and springs.  According to
                                ^ considered tlw constituent of potential concern, which
                                       orfgtoatedrrom the Y-12 Hint. Surface water has
been used in the past for irrigation at the arboretum.  Some contaminants have been detected in
the surface water, but none other than carbon tetrachloride were found at levels of regulatory or
risk-based concern.   Ag
-------
              t; is  available in the Administrative Record for die site.   In addition  to
contamination originating from the Upper EFPC CA by groundwater, other potential sources
nearby could contaminate groundwater or surface water.  The TDEC Division of Superfund has
been notified of the existence of potential contamination sources in Union Valley outside the ORR
boundary and is initiating an investigation.

       The carbon tetrachloride-dominated plume source is under the east end of the Y-12 Plant
where  very high concentrations of carbon tetrachloride  (up  to  8,500 ppb)  and lower
concentrations of other contaminants (chloroform, PCE, and TCE) have been detected.  The
plume contaminants have been detected in much lower concentrations (up to 200 ppb) in a well
at depths of 30-46 m (100-150 ft), 550 m (1,800 ft) east of the Y-12 Plant boundary in Union
Valley. Samples from shallower and deeper wells at this location  did not contain contaminants
clearly linked to this source,  although low levels of PCE and TCE were detected in the shallow
[9-m (30-ft)-deep] wells. Carbon tetrachloride was detected at  7 ppb in springs at the headwaters
of Scarboro Creek near Illinois Avenue 850 m (2,800 ft) east of the Y-12 Plant boundary.  The
contaminated groundwater is thought to surface at the creek; a groundwater divide is thought to
be just east  of  Scarboro Creek.    No  carbon  tetrachloride  was detected  in the shallow,
intermediate, or  deep wells  that are 400 m (1,300 ft) east of Scarboro Creek.  Groundwater
contamination originating from the Y-12  Plant is thus thought to have migrated no farther east
than Scarboro Creek.

       None of the current landowners in Union Valley extract groundwater for residential use;
no groundwater extraction wells are planned.  Rogers Group, Inc., quarry on lot Excess (613)
near the eastern end of Union Valley, 3,700 m  (12,000 ft) east of the Y-12 Plant, pumps out
some groundwater to maintain a dewatered working area.  The water  is discharged to surface
water and is not used for drinking or other  industrial purposes.  No contamination has been
detected in the quarry groundwater.

       The Union Valley interim remedial  action boundary is shown on Figure 2.2.  The
boundary is intended to address any contamination originating  from the Upper EFPC CA that
could be transported off site by  groundwater.  The only known groundwater plume originating
from the Upper  EFPC CA is the carbon tetrachloride-dominated plume that extends from the
eastern Y-12 Plant  boundary (all directions refer to administrative north) to Illinois  Avenue.
Carbon tetrachloride, a Class B2 (probable) human carcinogen, has been detected in two springs
that feed Scarboro Creek.

       The western boundary of this remedial action & the eastern Y-12 Plant property line. The
eastern limit of the boundary is lot Excess (613), the quarry property. From 1943 to 1946, large

1TOOMWIO.IMA/MBH                          '   2-6                                  April 29. 1997

-------
^
-J
     ANDERSON COUNTY PROPERTIES INCLUDED IN INTERIM REMEDIAL ACTION BOUNDARY
    PARCEL     PLAT BOOK  PAGE
    25-CC-8
    25-CC-9
    26-CC-1
    26-CD-1.01
    1.02. and 1.03
    26-CD-2
    26-CD-3
  N-18
  W-18
  C-18
  K-15

  E-19
  R-16
207
743
100
211
PARCEL
26-CO-4
26-CD-5
27-CC-3
27-CO-302
27-CM
28-CD-4
28-CD-8
PLAT BOOK
   0-18
  No. Ref.
   G-16
   S-18
   N-17
   G-16
   J-17
PAGE
 752

 693
 221
 179
 693
 402
PARCEL
28-CD4
29-CD-2
30-CE-001
Excess (A-2)
Excess(613)
Excess (Arboretum)
PLAT BOOK
   J-17
   G-16
   J-19
  No. Ref.
  No. Ref.
   B-8
PAGE
 402
 693
 618
                                                                                   367
                                       Interim Remedial Action Boundary

                                                             University of Tennessee

                                                                   F.A.I.R.

                                       CteBC       '         '
    LEGEND
           ZonmgOes«rallonaoundeiy
           Lo! Boundary
                  ZOMNO LAND USE
                    FAIR, Foresby. Agriculture. Industry, and Research District
                    MM Industrial Dttrtd
                    RO-I Residential. Open Space, and Reserved District
                    «•« One-Fan«y Residential District
    JE
Fig. 2.2
    Zoning designations and properties within the interim remedial action boundary
                        DOE - UnionViley - OakRMge,Tennetua
                                                                                        OOCUCNTDBOO
                                                                               ORAWNOD:
                                                                               S7-IKD.COR
                                                                                                                          DRAWMOMTE:

-------
quantities of carbon tetrachloride were used at the Y-12 Plant for electromagnetic separation of
uranium. Groundwater contamination probably began at that time. The quarry has operated for
more than a decade, and no contamination has been detected  since sampling began in 1995.
Because the quarry extends into the Maynardville Limestone (the primary transport pathway for
the known plume) and groundwater seeping into the quarry is collected and discharged, even if
the plume expands east of Scarboro Creek, it is  unlikely that the plume could migrate almost
3 km (2 miles) farther east past the quarry.

       The plume in Union Valley is assumed to be contained  in the Maynardville Limestone,
which runs parallel to the valley.  This limestone formation contains  a better developed karst
system than adjacent formations, and  water  from the.adjacent  formations,  flows toward the
Maynardville Limestone.  For this reason, the northern boundary is defined by the northern edge
of the Maynardville Limestone at the surface.  The southern boundary is defined by the southern
edge of the Maynardville Limestone, which dips about 45 degrees to the south, at a depth of
300 m (1,000  ft). Little contamination  is expected at 300 m (1,000 ft) and below because there
are  fewer  developed karst features  at those  depths and the  formation  is  much tighter.
Furthermore,  it is unlikely that groundwater extraction wells would be drilled to those depths
because of the expense and the low  likelihood of finding a region that could produce usable
quantities of water.

       An extension of the boundary to the south includes the properties adjacent to Scarboro
Creek. Contamination from the groundwater plume reaches the surface in seeps and springs that
feed the creek. Contaminated  groundwater from the plume  could possibly flow southward into
the shallow overburden above the bedrock along Scarboro  Creek.  Bethel Valley Road is the
southern boundary  of the extension  because  DOE owns the property south of the road and
institutional controls under other programs  are sufficiently protective.

       The land over the known extent of the carbon tetrachloride dominated plume (see Fig. 2.1)
is zoned by the city of Oak Ridge as  "Industrial District 2." Most of the land in Union Valley
east of Illinois Avenue is zoned as  "Forestry,  Agriculture, Industry, and Research District" and
is part of the arboretum.  Other small parcels east of the  plume are designated as "Residential,
Open Space,  and Reserved District" and "Industrial  District  2."  The nearest "One-Family
Residential District" is about 3.6 km (2.25  miles) east of the known extent of the plume.
Figure 2.2 identifies the zoning designations and properties in the subject area.
JTOOM96IO.IMA/MBH                .              2-8                                 Afrt 29. 1997

-------
                        SUMMARY OF SITE RISKS


      A baseline risk assessment will be completed as part of the Upper EFPC CA RI. The CA
includes the carbon tetrachloride-dominated plume and the two springs  where the plume has
surfaced. Preliminary results of a human health risk screening evaluation were reported in the
Union Valley  interim study (ORNL 1995).  Some contaminants in the groundwater and a  very
few contaminants in the springs that feed Scarboro Creek would pose a threat to human health
under a residential ingestion scenario.  Because the water is not used for residential or industrial
purposes, there are no currently unacceptable risks. The potential health  risk to a child wading
in Scarboro Creek is within acceptable limits, according to the preliminary evaluation.

      A thorough investigation of potential harm to the environment will be deferred to the
decision documents  for the Upper EFPC CA.   In  preliminary  investigations, two organic
chemicals were detected in surface water in Union Valley. The measured  concentrations of both
compounds were well below the ecological lexicological benchmark for aquatic biota.


                DESCRIPTION OF THE ALTERNATIVES

      Only two interim actions,  no  action and institutional controls, were considered in the
interim proposed plan because final decisions regarding remedial actions affecting Union Valley
will not occur until completion of Upper EFPC CA studies.

ALTERNATIVE  1-NO ACTION

      The NCP requires consideration of a no action alternative to serve as a baseline for
comparison with other alternatives.   If no interim actions are  implemented in Union Valley,
existing zoning and other municipal ordinances and county and state regulations would continue
as the only controls on the use of property and groundwater. Monitoring of Union Valley would
not be required under the no action alternative.

ALTERNATIVE 2—INSTITUTIONAL CONTROLS

      This alternative is based on a strategy  for implementing  institutional controls to prevent
                                                 •
potentially unacceptable exposure to contamination and to reduce its potential spread during the
interim period until final decisions are made for the Upper EFPC CA.
JT000496IO.IMA/MBH                            2-9                                 Aprfl 29. 1997

-------
                                                                                            1
      DOE flfffii into license agreements with all affected property owners within the interim
remedial action boundary,  these agreements require property owners who are not currently
extracting or using groundwater or surface water to notify DOE 90 days before any extraction
or use is proposed. Owners of the quarry [lot Excess (613)] and lot Excess (arboretum) would
agree to notify DOE 90 days before any proposed new extraction or use or before any change
in current use such as use of groundwater or surface water for drinking or food crop irrigation.
No other owners currently extract or use groundwater or surface water.

      Upon notification of proposed use or change in use of surface water or groundwater, DOE
would evaluate the intended use.  If the use is unacceptable, DOE would negotiate a separate
agreement with reasonable terms under the circumstances to  connect the owner to the existing
municipal water system or other appropriate water supply.

      In addition, DOE will Conduct an annual title  search to determine whether any affected
property changed hands and, if so, verify that the new owner has been notified of the provisions
of the license agreement.  DOE j||jp also write annually to property owners reminding them of
their obligations under the agreement.
                                                                                  •

      No monitoring would be required by this alternative.  Monitoring of Union  Valley
groundwater  and  surface  water  contamination may  continue as part  of  DOE watershed
management monitoring for use in future remediation decisions.


 SUMMARY  OF COMPARATIVE ANALYSIS  OF ALTERNATIVES

      The two alternatives in the interim proposed plan were evaluated against the nine criteria
developed by EPA to measure overall feasibility and acceptability of remedial alternatives. The
first two criteria are threshold criteria and must be met in initial  screening of any alternative
considered for selection in the ROD. The next five criteria are balancing criteria and represent
the primary criteria  upon  which the  analysis is based, taking into  account technical, cost,
institutional, and risk considerations.  The final two modifying criteria were evaluated after  a
regulatory agency review and a public comment period.
/nXXMMIO.IMA/MBH                           2-10                                *T* ». 1997

-------
                                                                                               1
THRESHOLD CRITERIA

       1.  Overall Protection of Human Health and the Environment
          Alternative 2 Usuries that all current and future property owners are aware of the
                       •••:-•••-:-:•'•••••• •>••••;-:•:•;                              *
          potential risk from drinking contaminated surface water or groundwater. This should
          adequately protect human health.  Control  of additional extraction of groundwater
          would mitigate the further spread of contamination.  Therefore, Alternative 2 will
          protect human health more effectively than the no action alternative.

          The no action alternative may not adequately protect human health because human
          health could be adversely affected from ingestion of groundwater or surface water in
          Union Valley.  The only existing controls on such.use are federal, state, and county
          regulations and municipal  zoning and ordinances.  Tennessee state  law prohibits
          construction of new wells for the purpose of production of water from underground
          sources  "at  other  than a  safe  distance  from  any   known  potential  source  of
          contamination" [TDEC  1200-4-9-. 10(2)(a)]  and requires installation of water filters
          and treatment units "to accommodate water .quality problems" [TDEC 1200-4-9-.il
          (10)].  Well drillers must be licensed, but there are no requirements for verifying the
          absence of contamination sources before drilling.  Drillers are required to submit a
          report to TDEC within 30 days after completion of a water well.  These  existing
          controls will   reduce  the likelihood  of  human  consumption of  Union  Valley
          groundwater, but may  not preclude such consumption. This interim action is not
          intended to address ecological risks, if they exist.

          Under the no action alternative, additional groundwater wells could be installed in the
          Maynardville Limestone in Union Valley and  groundwater  could be extracted for
          drinking or industrial use.  The contamination  plume  originating in the Y-12 Plant
          comes to the surface at springs  feeding Scarboro Creek.  Because of the assumed
          natural hydraulic gradients caused by a groundwater divide  east of the creek, it is
          believed that the plume does not migrate farther to the east. Extraction of significant
          volumes of groundwater from the assumed uncontaminated region east of Scarboro
          Creek  could   affect  this  natural  groundwater  divide  and  cause  contaminated
          groundwater to flow east of the creek, expanding the area! extent of the plume.
          Extraction of groundwater in the contaminated region between the Y-12 Plant and
          Scarboro Creek (at Illinois Avenue) could also accelerate contaminant migration and
          put potential consumers of that groundwater at risk.
 JTOOM96IO.IMA/MBH                          '  2-11                                  Afrt 29. 1997

-------
      2. Compliance with Applicable or Relevant and Appropriate Requirements

         On-site interim remedial actions under CERCLA are required to comply with only
         those ARARs specific to the interim action being implemented.

         Alternative 2 would not trigger any location-specific ARARs because this alternative
         would not affect any sensitive resources.  Water quality standards and Safe Drinking
         Water Act maximum contaminant levels (MCLs) (which could be ARARs for the
         groundwater and the springs during a final action) and other chemical-specific ARARs
         are outside the scope of this interim action because no actions will be taken to alter
         contamination levels.  The final action for this site will be taken as part of the Upper
         EFPC ROD, which will address Union Valley groundwater.  MCLs will be ARARs
         for setting cleanup  goals for that action.  Chapter 1200-l-13-.08(3)(a).(iv) of TDEC
         final Rule, "Inactive Hazardous Substance Site Remedial Action Program," effective •
         February  19, 1994, requires institutional controls whenever a remedial action does not
         address concentrations of hazardous substances that pose or may pose an unreasonable
         threat to public health, safety, or the environment.  This rule, however, is applicable
         to actions "...consistent with a permanent remedy..."  and is not applicable to this
         interim action.  Alternative 2 is an administrative remedy for an interim action and,
         therefore, there are no  location-, chemical-,  or  action-specific ARARs pertaining to
         die proposed actions.

         A statutory requirement under CERCLA [Sect.  121(b)(l)] requiring protection of
         human health and  the environment would not  be met by  the no action  alternative
         without some assurance that exposure pathways would remain incomplete in the future.

BALANCING CRITERIA

      3. Long-Term Effectiveness and Permanence

         For Alternative 2, long-term effectiveness is evaluated for die period beginning when
         initial institutional  controls (i.e., executing license agreements) are implemented per
         this interim action ROD and ending when final remedial* actions are implemented per
         the Upper EFPC CA ROD.  The interim actions include notification by property
         owners of use or change of use of surface water or groundwater, prohibition of any
         unacceptable actions, and annual title searches  and notifications  by DOE as a due-
         diligence measure to identify undisclosed changes in ownership and remind owners of
         their obligations.  These actions are considered very effective for diis interim period.

nXHMWIO.lMA/MBH                            2-12                                  Afrt »• I"7

-------
         The no action alternative would not effectively preclude unacceptable extraction or use
         of surface water or groundwater in the long term.  Therefore, the no action alternative
         would not be effective in the interim period or the long term.

      4. Reduction of Toricity, Mobility, and Volume Through Treatment

         Neither alternative includes treatment  to  reduce toxicity, mobility, or volume of
         contamination.  This was not considered practical for an interim action.

      5. Short-Term Effectiveness

         Short-term  effectiveness considers the time needed for an alternative to achieve
         objectives  and the  risks  to  workers,  residents,  and  the  environment  during
         implementation.   For Alternative 2,  the short term  is the period until  license
         agreements are executed.

         Alternative 2, institutional controls, is considered very effective in the short term for
         the following reasons:  (1) No one is currently at risk from contamination at the site.
         (2) License agreements have been implemented.   (3) There will be little or no risk to
         workers.
          No additional time is required to implement Alternative 2 1|||||||^^
          have signed the license agreements §|||F||||.  Compliance with the license terms,
          ensured by DOE's  annual  title searches and  notifications, would protect future
          purchasers  of affected properties.   Current owners have been made aware of the
          contamination and are unlikely to change their current safe practices.  Thus, they are
          protected now.

          Implementation of the  no action alternative requires no time, and there is no risk to
          human health or the environment resulting from  implementation.  Risks are limited to
          potential,  not actual exposures; because no one currently uses groundwater for
          drinking, short-term effectiveness is high.  However, the alternative does not achieve
          the response objectives  of  mitigating future risks  and reducing further potential
          expansion of the plume and  cannot be selected as the preferred alternative.
JTOOM9610.IMA/MBH                             2-13                                  Af* *»• tvr>

-------
                                                                                                1
      6. Imptementability

         Executing  the license agreements  and performing  the annual title searches  and
         notifications for Alternative 2 would be straightforward. No actions are required for
         Alternative 1.

      7. Cost

         The costs for the institutional controls alternative are as follows. Executing license
         agreements with the 19 current landowners for new or changed groundwater or surface
         water use notifications cost a total of approximately $22,500. Annual title searches,
         fees, and notifications would cost approximately $6,900/year for the assumed 4-year
         duration of the interim actions.  No cost has been projected for agreements to prohibit
         unacceptable uses of groundwater or surface water. No such uses are expected during
         the interim action period,  and the  cost for  an agreement,  if any, would be highly
         uncertain and site-specific. The present value of the capita] and annual costs for the
         institutional controls alternative would be approximately $50,000.

         No costs are associated with the no action alternative.

MODIFYING CRITERIA

      8. State/Support Agency Acceptance

         The state of Tennessee and EPA prefer Alternative 2 to ensure protection of human
         health during the interim period before final actions are taken  for the Upper EFPC
         CA.

      9. Community Acceptance

         The property owners in Union Valley are the members of the community most affected
         by the proposed actions. All affected owners have executed license agreements  with
         DOE, thus indicating their concurrence with the actions proposed for Alternative 2.
         Comments from the public on  the  proposed plan have been considered.   Most
         commentors requested clarifications regarding the nature of the contamination and the
         schedule for final actions, rather than changes in strategy for the preferred interim
         alternative.  Clarifications and other responses are provided in the "Responsiveness
SnOMMIO.lMA/MBH                             2-14                            .     *P* »•

-------
         Summary."  Based on input from property owners and the public, DOE considers
         Alternative 2 to be consistent with community preference and necessary  to protect
         human health.


                            SELECTED REMEDY

      DOE has selected Alternative 2, Institutional Controls, as the most appropriate interim
action for the Union Valley portion of the Upper EFPC CA.  The decision is based on CERCLA
requirements, the comparative analysis of alternatives in the interim proposed plan (DOE 1996a),
and public comments.  EPA and TDEC concur with the selection.

      The selected remedy is protective of human health.  There are no ARARs for the selected
remedy, which also meets the remaining  criteria.  This remedy does riot satisfy the statutory
preference for remedial actions that use treatment to reduce toxicity, mobility, and volume;
however, DOE believes this interim remedy will be adequately protective at a reasonable cost.
No ecological risks have been identified; however, this remedy would not address ecological risks
if they exist.

      DOE has  been proactive in protecting the public by obtaining license agreements with
property owners before issuing this ROD.  Copies of the license agreements are maintained by
the DOE Real Estate Office. If any future property owners refuse to execute license agreements,
DOE shialltatette legal step oettssair^
theetrvuoimie&tare r^ec^:::iS{e|»'"may ircfade fbrrnaliy advmng theprojpeity cwiieiyiteOaik
Ridge cfcg manager and "
-------
      Although outside the scope of this ROD, current DOE monitoring plans include sampling
at the existing well, spring, and Rogers Group, Inc., quarry monitoring locations  in Union
Valley. The TDEC/DOE Oversight Division will perform additional monitoring in Union Valley
as described In the chvbioa's asaaal environmental monitoring plan. All monitoring results will
be submitted to the DOE Program Office and to the TDEC/DOE Oversight Division.

      The DOE Real Estate Office shall report search results to the DOE Program Office. The
DOE Program Office will also act upon any notifications by property owners of proposed new
uses or changes in use of surface water or groundwater within the  interim remedial action
boundary. The proposed uses will be investigated and, if found to be unacceptable, the DOE
Real Estate Office will be advised to negotiate a separate agreement with the property owner
prohibiting such unacceptable use with reasonable terms under the circumstances.


                    STATUTORY DETERMINATIONS

      Section 121  of CERCLA  establishes several statutory requirements and preferences,
including  compliance  with  ARARs.     Statutory  requirements specify preferences  for
cost-effectiveness, use of permanent solutions and innovative treatment technologies or resource
recovery  technologies to the maximum  extent  practicable,  and finally a preference for use of
treatment that permanently reduces the toxicity, mobility, or volume of hazardous substances.
On-site interim remedial actions under CERCLA are required to attain only those ARARs specific
to the action being implemented, and the above criteria apply to the selection of a final.remedy.

      This interim action is protective  in the short  term of human health through control and
limitation of exposure to  the contaminants and limitation  of  the  potential spread of the
contamination. There are no ARARs specific to this interim action. The action is cost-effective.
DOE  believes the selected interim action represents the  best balance of trade-offs in terms of
short-term effectiveness, implementability,  and cost  for its  limited scope. The action does not
utilize treatment and is not permanent, but  does reduce the  potential for  acceleration of
contaminant migration and is appropriate for an interim response. Tlie^tatatoijf preference tat
               : addressed fcy fefcart deai^ decisloiB ^


             EXPLANATION OF SIGNIFICANT  CHANGES

      The interim proposed plan  for Union Valley was released for public comment in August
 1996.  The proposed plan identified  the  institutional  controls alternative as the preferred

ntWWWIO 1MA/MBH                          ' 2-16                                Aprt ». W?

-------
alternative.  DOE received oral comments in the public availability session and written comments
from three organizations and one individual during the public comment period. DOE, EPA, and
TDEC reviewed the comments and determined that no significant changes to the remedy, as
originally identified in the interim proposed plan, were necessary.


                                REFERENCES

DOE (U.S.  Department of Energy).  1996.  Interim Proposed Plan for Union Valley, Upper East
      Fork Poplar Creek Characterization Area, Oak Ridge, Tennessee, DOE/OR/02-
       1452&D2.  Oak Ridge, TN.

Energy Systems (Lockheed  Martin Energy Systems).   1996a. Compendium of Available
      Documentation on Upper East Fork Poplar Creek Study Areas, Oak Ridge Y-12 Plant,
       Oak Ridge, Tennessee, Y/ER-274. Energy Systems Environmental Restoration
      Program, Oak Ridge, TN.
                                                                                w
Energy Systems.  19%b. Determination of Reference Concentrations for Inorganic Anatytes
       in Groundwater at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee, Y/ER-234.  Oak
       Ridge, TN.

ORNL (Oak Ridge National Laboratory).  1995.  Union Valley Interim Study Remedial Site
      Evaluation, Y/ER-206/R1. Oak Ridge, TN.
/I1HMMIO.IMA/MBII                           2*17                               Api 29. 1997

-------
           PART 3.  RESPONSIVENESS SUMMARY
rnXXM96IO.IMA/MBH                                            Aprt ». 1997

-------
                     RESPONSIVENESS SUMMARY

      This chapter documents the formal public comments on the Interim Proposed Plan for
Union Valley, Upper East Fork Poplar Creek Characterization Area,  Oak Ridge,  Tennessee
(DOE 19%) and the DOE response to the comments. DOE received oral comments in the public
availability session and written comments from three organizations and one individual during the
public comment  period August 6-September 5,  1996.

      The institutional controls alternative presented in the interim proposed plan is now the
selected  interim  remedy for Union Valley, Upper EFPC CA.  This decision is based on the
administrative record for the Upper EFPC CA, including the interim proposed plan (DOE 1996),
public comments, and other documents in the administrative record file for this site.

      This chapter serves three purposes.   First, it provides DOE, EPA, and TDEC with
information about community concerns with the site and preferences regarding the preferred
alternative presented in the interim proposed plan. Second, it demonstrates how public comments
were integrated into the decision-making process.  Third, it allows DOE to formally respond fo
public comments.

COMMUNITY PREFERENCES

      DOE received 44 comments on the interim proposed plan.  Oral comments  from the
August 7,19%,  public availability session were recorded. Written comments were received from
the ORR Environmental Management Site-Specific Advisory Board, Oak Ridge  Environmental
Peace Alliance,  UT Agricultural Experiment Station, and T. R. Wood.

INTEGRATION OF COMMENTS

      Clarifications of the selected interim  remedy were made based on suggestions  in the
comments, but these did not change the intent of the preferred alternative. The  comments will
also be considered during development of the Upper EFPC CA RI/FS.
JTOMMIO.IMA/MBH                            3-2                                *f* »• 1997

-------
                UNION VALLEY PUBLIC AVAILABILITY SESSION
                                   August 7, 1996
              Comments provided by Sonya Johnson (DOE) from meeting
                                    participants

PUBUC-1 COMMENT

      To what extent has the source term impacted the Union Valley area?

      Response:  Contaminants associated with  the Y-12 Plant have been detected in samples
from two monitoring wells and two springs in Union Valley. The two monitoring wells, GW-169
and GW-170, are located on city of Oak Ridge property just west of the Remotec property.  GW-
169 monitors groundwater at depths of 9.1-10.6 m (29.7-34.7 ft) below ground surface (bgs).
GW-170 monitors groundwater at depths of 31.7-47.8 m (104-156.9 ft) bgs.  The contaminants
have been detected in these two monitoring wells since 1990; reported concentrations have been
variable, with  higher concentrations in GW-170, the  deeper well.   Carbon tetrachloride and
chloroform, the primary components of the source term originating from the Y-12 Plant (see
Public-2 and  Public-5  Responses),  have been  detected only  in GW-170 at maximum
concentrations  of 200 and 95 ppb, respectively.

      PCE and TCE have been detected in Union Valley  monitoring wells, but available data
suggest  that the shallow PCE and TCE contamination  may not be from the same source as the
carbon tetrachloride and chloroform.  Maximum PCE and TCE concentrations in GW-170 are
11 and 4 ppb,  respectively.  The maximum concentrations of PCE and TCE from GW-169 are
4 and 6  ppb, respectively.
                  • *>
           « -  •»"-—
      The two springs where carbon tetrachloride was detected are near Illinois Avenue. Spring
SCR7. ISP is south of Union Valley Road and west of Illinois Avenue. Carbon tetrachloride has
been detected in this spring over the past several years, with a maximum concentration of 7 ppb.
Spring SCR7.18SP is just east  of Illinois Avenue and south of Union Valley Road.  Carbon
tetrachloride has been detected  in one sample collected in March 1996 from  this  spring at a
concentration  of 4 ppb.  PCE and TCE have  been detected in these springs at maximum
concentrations  of 2 ppb.

      The locations where the source term has been detected in Union Valley are underlain by
the Maynardville Limestone, which is one of several geologic units that comprise Bear Creek
Valley and Union Valley.   The area at the surface that is  underlain by the  Maynardville
Limestone is a relatively narrow band that extends along Bear Creek Valley and Union Valley.

JTOOMMIO.IMA/MBH                             3-3                                AP* &• V*"

-------
The Maynardville Limestone consists of limestone and dolostone, with interbedded shales.  The
unit is highly fractured and contains numerous cavities or karst features formed by the dissolution
of the rock.  Most of the karst features occur in the top 30 m (100 ft) of the limestone.  The
Maynardville Limestone transports groundwater and its associated contaminants eastward and acts
as a drain for the Y-12 Plant (ORNL 1995).

      The current assumption is  that the springs  in Union Valley and Scarboro Creek are
discharge points for the groundwater in the Maynardville Limestone.  Because Scarboro Creek
is a discharge point, it is unlikely that the plume will move eastward beyond the creek.  As noted
in a June 2,  1995,  letter  from TDEC (see SSAB-13 Comment,  OREPA-2  Comment,  and
SSAB-13 Response), the highly fractured nature of the bedrock underlying Union Valley suggests
that it could transport contaminants in other directions; however, data from numerous wells at
variable depths across the Y-12 Plant support the interpretation that the transport direction from
the plant is almost exclusively eastward and  is contained in the Maynardville Limestone.  The
hydraulic gradient and,  therefore,  the flow direction are from other formations toward die
Maynardville Limestone.

PUBLIC-2 COMMENT

       Has the source been specifically identified?

       Response:  Sources  outside the Y-12 Plant have not yet been characterized. The TDEC
Division of Superfund is initiating an investigation of other potential sources.

       The Y-12 Plant used several million  pounds of carbon tetrachloride between  1943 and
1946 in the  electromagnetic  separation process  to  produce enriched  uranium.   Carbon
tetrachloride reacted with the starting material, which typically was uranium trioxide, to produce
uranium tetrachloride.  The uranium tetrachloride served as feed  material for the Calutrons,
production mass spectrographs used for the uranium separation process.   Historical records
suggest that  the use of carbon tetrachloride to react with  die starting material occurred in
Buildings 9202, 9203, and 9205, which are near the east end of the plant.  Floor drains and/or
storm sewers apparently collected spills and leaks of solvents associated with the electromagnetic
separation process.   There  is  no evidence of releases of die uranium compounds  to the
groundwater in this  area of the plant.  Spills associated with railroad tanker cars transporting
carbon tetrachloride at the Y-12 Plant also  may be a source for groundwater contamination.
Carbon tetrachloride appears to have been used at the plant after 1946, although  in much smaller
quantities, as a dry cleaning solvent.
 JTOOMMI0.1MA/MBH                           '  3-4                                 Apri »• '»»*

-------
      Chloroform is a common laboratory chemical that apparently has been used at the Y-12
Plant, although specific  applications are  unclear.  Available information suggests that  the
quantities of chloroform used throughout the plant were relatively small.  Chloroform also is a
breakdown product (via biodegradation) of carbon tetrachloride, and this is the probable origin
of the chloroform present in the Y-12 Plant and Union Valley  monitoring wells.  Elevated
concentrations of chloroform are almost exclusively associated with elevated carbon tetrachloride
concentrations.  In addition,  chloroform may be a by-product of drinking water chlorination.

      PCE was used as a vapor degreasing agent throughout the Y-12 Plant during the 1970s
and 1980s and was discontinued in approximately 1987.  Uranium machining operations also used
PCE mixed with mineral oil as a machine coolant.  Approximately 250,000 L (70,000 gal) of
PCE were used each year for cooling applications; this use was discontinued in  1984 or  1985.
Leaks and spills of PCE, either onto the ground or into  storm drains, are potential sources of the
groundwater contamination.

      TCE has had two  primary applications at the Y-12 Plant: as a cooling agent for various
machine processes and as a plasticizer.  A plasticizer  is a substance added to plastics or other
materials to retain softness and pliability in molds.  TCE also is used widely in industry as* a
cleaner or degreaser, although  the extent of this application at  the Y-12  Plant is unknown.
Currently, no specific information  is available on the handling or disposal of TCE, which may
also be a breakdown product of PCE.  Spills or leaks of TCE onto the ground or into storm
drains are potential sources of groundwater contamination.

      It is important to note that the uses and processes described above are not ongoing at the
Y-12 Plant and do not represent a continuing source of contaminants. Historical releases, which
are now  in the subsurface soil and in groundwater under the plant, do continue to contribute
contaminants and are termed secondary sources. Public-S Response  discusses the. secondary
source of carbon tetrachloride in groundwater at the Y-12 Plant.

PUBUC-3 COMMENT

      Will you get more specific with your information?

      Response:  As part of the Upper EFPC CA RI, available documentation on all potential
sources in the Y-12 Plant area has been assembled into a compendium of information (Energy
Systems  1996a) that includes historical and process information and data from samples collected
at the site.  The location of heavy carbon tetrachloride  usage in the 1940s, for example, appears
mOXWIO.IMA/MBH                              3-5                                  April 29. 1997

-------
                                                                                               \
to have been Buildings 9202, 9203, and 9205, which are all near the east end of the Y-12 Plant.
The railroad tanker cars would have been unloaded in this area, as well.

       A large body of groundwater and surface water data, collected over the last 10 years, is
available; the location and concentrations of contaminants that have moved off site to Union
Valley are relatively well constrained.  An adequate amount of data may already be available for
the fate and transport evaluation  in the RI.  A workshop was convened in October  1996 to
determine the need for additional data collection in support of the RI; the results of the workshop
are not yet available.

PUBLIC 4-COMMENT

       What is the proposed schedule for managing the source term?

       Response:  Monitoring of groundwater and surface water is ongoing, and this provides
data that can  identify any changes, in concentration  and location of the contaminants.  The
schedule for completion of the RI for  the Upper EFPC CA and implementation of appropriate
actions has not  been finalized, but DOE intends to  have a final ROD  by September 2000.
Management actions and schedules for source terms will be defined in that ROD. Early actions
are considered and may be taken before the final Upper EFPC CA ROD is issued.

PUBLIC-5 COMMENT

       How contaminated is the source term?
                    «,
       Response:  Approximately 10 million gal of carbon tetrachloride were used in the 1940s
for electromagnetic separation in the eastern and  east-central areas of the plant.  The amount
spilled is unknown, and  there are no current releases  from plant operations.  The highest
concentrations of carbon tetrachloride detected in groundwater are in monitoring wells just to the
southwest of New Hope Pond.  Well GW-381, which monitors, groundwater in the eastern end
of the plant,  15.0-18.4 m (49.3-60.4 ft) bgs, has  had maximum carbon tetrachloride and
chloroform concentrations of 8,500 and 2,300 ppb, respectively. Well GW-382, which monitors
groundwater 38.1-52.7 m (125-173  ft) bgs, has had  maximum  carbon tetrachloride and
chloroform (a  degradation product  of carbon  tetrachloride) concentrations of 7,400 and
 1,100 ppb, respectively.

       The maximum concentrations  of carbon tetrachloride in  these wells are high enough
(greater than 1 percent of the solubility limit) to suggest that the source is a nonaqueous-phase

ntXXMMIO.IMA/MBH                            3-6                                  April w- ""

-------
liquid. In other words, the carbon tetrachloride at these locations is concentrated enough to be
in a liquid phase distinct from the groundwater in which it occurs. Because the density of carbon
tetrachloride is  greater than water, it is  termed a dense nonaqueous-phase liquid (DNAPL).
DNAPLs can act as secondary sources of groundwater contamination after the primary source
of the contamination has been removed.  In  general,  DNAPLs are difficult to remediate,
especially in a fractured bedrock setting like the Y-12 Plant. Containment is a possible treatment
option that will be evaluated in the FS.

      In contrast, the highest  PCE and TCE concentrations are in monitoring wells just to the
north and west  of New Hope Pond.  Well GW-762, which is west of New Hope Pond and
monitors groundwater  14.7-17.8  m (48.2-S8.S ft) bgs, has  had maximum PCE and TCE
concentrations of 1,400 and 75 ppb, respectively.  Well GW-383, which is north of New Hope
Pond and monitors groundwater 5.5-7.0 m 08.1-23.1 ft) bgs, has had maximum PCE and TCE
concentrations of 510 and 190 ppb, respectively.

PUBLIC-6 COMMENT

      Will the  plume continue to get worse/spread?

      Response:  It is believed that, under existing conditions, the plume already has reached
its terminus and is at a steady state.  However, additional  spreading cannot be dismissed,
particularly if groundwater flow is altered, for example, through extraction of groundwater from
new wells east of the plume.

PUBLIC-7 COMMENT

       Does continued quarrying accelerate  the  movement   of  the plume or  increase the
contamination leaving the site?

       Response:  Our current understanding is that quarrying has not had an effect on plume
movement.  The quarry is approximately 2.4 km (1.5 miles) east of Scarboro Creek, which is
thought to be a local groundwater discharge point.  In other words, groundwater east of Scarboro
Creek flows west toward the creek and discharges into it; groundwater west of Scarboro Creek
flows east toward the creek and also discharges into it.  The amount of pumping at the quarry
is probably not significant enough to affect plume movement. The activities outlined in the
interim proposed plan for Union Valley include a license agreement with  property owners that
 JTOOO«H10.IMAMBH                             3-7                                 *P* ». 1997

-------
would  require  the  owners  to notify  DOE 90 days  before  any new extraction or use of
groundwater. Any additional use of water or changes in water use, therefore, would be evaluated
in advance.

PUBUC-8 COMMENT

       Has DOE ever sampled the water at the quarry at the west end of the turnpike in Oak
Ridge (near the vacant gate going onto K-25 Site)?

       Response: Not to our knowledge. The quarry in question is many miles from the subject
plume, in different geologic formations,  and not in  the direction of groundwater flow from the
plume affecting Union Valley.

PUBLIC-9 COMMENT

       Stakeholder stated that she is surprised that DOE is using only six wells for monitoring
the groundwater.  Where  are the six wells that  DOE  is using?  Are they at two separate
                                                                                    «
locations?

       Response: The U.S. Geological Survey installed the six monitoring wells in Union Valley
as part of a hydrplogic investigation in 1986. The wells are at two locations: on the city of Oak
Ridge property just west of the Remotec property and on the UT Arboretum property.  The wells
on city property include GW-169, GW-170, and GW-232, and the UT Arboretum wells include
GW-171, GW-172,  and GW-230.  At each site, the  three  wells comprise a cluster that monitors
discrete depth intervals.  Wells GW-169 [total depth  13 m (42 ft)] and GW-171 [total depth 9.4 m
(31 ft)] monitor the unconsolidated zone above bedrock.  GW-170 [total depdi 47.9 m (157 ft)]
and GW-172 [total depth 40.8 m (134 ft)] monitor shallow bedrock. GW-232 [total depth 126 m
(412 ft)] and GW-230 [total depth 124 m (406 ft)] monitor deeper bedrock.

       The six wells are located within die  relatively narrow band at the surface that is underlain
by the Maynardville Limestone, which is the primary groundwater transport pathway from the
Y-12 Plant (see the response to Public-1). In addition, DOE regularly monitors springs in Union
Valley, which are discharge points for groundwater. The six wells at variable depths combined
with the springs provide an accurate network to monitor in Union Valley.  The TDEC DOE
Oversight Division also monitors the same wells and  springs and other locations in Scarboro
Creek and the TDEC Division of Superfund is initiating additional monitoring at potential source
areas in  Union Valley.
 nOXMMlO.lMA/MBH                             3-8                                  A|rt 29. 1997

-------
PUBUC-10 COMMENT

      Is the plume at a point where it will impact the Oak Ridge landfill?

      Response:  Given the current understanding of the groundwater flow in this area, the
plume is not likely to have an effect on the landfill because of the groundwater divide at Scarboro
Creek. It is possible that contaminants from the plume could mix with landfill contaminants, but
that is not likely to have an impact on the landfill.

PUBLIC-11 COMMENT

      What's the concentration of carbon tetra . . (I  didn't catch the chemical name) in the
plume?

      Response:  Refer to Public-S Response.

PUBLIC-12 COMMENT

      What  type of remediation  is DOE looking  at for the  DNAPLS?  Is containment a
consideration?

      Response:  A variety of remediation options will  be evaluated and addressed as part of
the FS for the Upper EFPC CA.  The FS will be completed in  1999.  Containment may be an
effective remediation option for DNAPLs in fractured bedrock;  therefore, it will be considered
in the development and evaluation  of alternatives.  It may be considered as an early action.

PUBLIC-13 COMMENT

      Have you studied the plume enough to know where it is  going and how fast?

      Response:  We have enough groundwater and surface water data to ascertain the direction
in which the plume is moving and its chemical composition. The fate and transport have not yet
been evaluated rigorously;  this evaluation will be completed in the Upper EFPC CA RI.
TTDOWWIO.IMA/MBH                          .  3-9                                 *** »•

-------
PUBLIC-14 COMMENT

      Are the results of the public meeting going to be summarized and made available to the
public?

      Response: Yes.

PUBLIC-IS COMMENT

      Stakeholder expressed concern that there is not better coverage in monitoring.

      Response: Monitoring of the six wells and numerous springs in Union Valley is planned
on a semiannual basis.  The combination of groundwater locations (wells) and groundwater
discharge locations (springs) have provided definition of the movement of the plume and temporal
variation in contaminant concentrations.

PUBLIC-16 COMMENT

      Stakeholder wants to see maps showing plumes.

      Response: Plume maps have been prepared as part of the evaluation of existing data for
the Upper EFPC CA RI and are available for distribution.

PUBLIC-17 COMMENT

      In the document, add statement regarding the landfill being a state Superfund site to the
last paragraph under the summary of risks on page 5.

      Response:  The interim proposed plan has been  issued to  the public and will not be
revised.  The statement in the public meeting that the closed municipal landfill in Union Valley
was included on the Tennessee Superfund list was incorrect; the reference was to a different
landfill.  The TDEC Division of Superfund has been notified of the Union Valley landfill and is
initiating investigations into potential releases or other hazards.  This is acknowledged in this
ROD.
 JTOOW96IO IMA/MBH                            3-10                                 Ap< 29. 1997

-------
 OAK RIDGE RESERVATION ENVIRONMENTAL MANAGEMENT SITE-SPECIFIC
                                ADVISORY BOARD
                               BOB PEELLE,  CHAIR
                                   August 28, 1996

GENERAL COMMENTS

SSAB-la COMMENT

      The plan seems adequate for the immediate future, but the 5-year term seems questionable.
If there is  knowledge that no large quantity of carbon- tetrachloride or other, contaminants)
exist(s) under the site so that future off-site concentrations will not increase, the plan would be
more acceptable.  The plan should include specific commitments for work in the near future if
there is the possibility that concentrations will increase.  The points of highest concentration on
site must be sought, and corrective actions planned in the near future, not 5 years hence.

      Response: The goals of this interim remedy are to prevent actions that would (1) put
people at risk from existing contamination in Union Valley and (2) spread contamination farther
than it has already reached.  Existing data and projections are insufficient to predict  whether
contamination levels in Union Valley will increase or decrease. Final actions will be proposed
through the CERCLA process under the  Upper EFPC RI/FS, proposed plan, and ROD.. The
RI/FS, scheduled to be available for public review in April 1999, is underway and is investigating
opportunities to remove or contain the groundwater contamination.  Potential early actions are
being investigated to determine whether effective, implementable,  cost-effective actions can be
taken before the  final ROD that will not conflict with any potential findings in the ROD.

      The analysis of the extent of the problem and the DOE contribution to that problem is
incomplete. Additional interpretation of existing data, identification of additional data needs,
collection of new data, and investigation of remediation options are still needed. If other sources
contribute to groundwater contamination, then costly remediation efforts to remove or contain
contamination sources at the Y-12 Plant could be wasted.

       Source removal in the areas having the highest concentration of the carbon tetrachloride
and  associated contamination on site is  not possible with any currently  used  or  innovative
technologies. Carbon tetrachloride is a DNAPL, which means that it is heavier than water, and
has very low solubility.  About 10 million gal of carbon tetrachloride were unloaded from
railroad tankers  and used in the 1940s at the  Y-12 Plant.  Spills  on the ground  during the


/raXM96IO.IMA/MBH                            3-11                                Apri 29. 1997

-------
unloading process and other operations likely contaminated the soil. Tens or hundreds of gallons
of carbon tetrachloride may have flowed by gravity into the limestone karst bedrock underlying
the Y-12 Plant.

       The bedrock is full of fractures, crevices, solution conduits, and caves through which
groundwater flows.  Groundwater may flow over a pool of DNAPL that has been caught in a low
spot or pocket in a conduit in the bedrock.  Although it is not very soluble, a small volume of
this DNAPL could bleed off enough dissolved carbon tetrachloride to contaminate groundwater
above regulatory concentration levels (ppb) for hundreds or thousands of years. There are no
technologies currently in use or being  studied that can detect a small volume of DNAPL that
could be from 3 to 300 m (10 to 1,000 ft) deep over an area of 40 ha (100 acres). Even if a
DNAPL source could be found, there are no technologies that could ensure complete removal of
such a source.  Because it is likely that largd volumes could have been spilled during historical
operations, there could be many widely  separated small sources.   If one source is missed,
groundwater contamination at unacceptable levels could continue.

       Because it may be technically impractical to remediate the source and prevent groundwater
from being contaminated, the Upper EFPC RI/FS is investigating ways to contain the plume and
prevent further migration of contaminated groundwater beyond the Y-12 Plant property line.
This may be possible, and several containment methods are under  investigation.  However,
containment may be technically or economically impractical in the karst bedrock system.  All of
the methods investigated require installation and operation of mechanical systems (e.g., wells,
pumps, treatment plants).   These systems would have  to be reliable until all  of the  DNAPL
sources have naturally disappeared, that is, dissolved into the water and collected and treated by
the mechanical systems.   If a large DNAPL  pool  exists, containment may be required for
hundreds of years.

SSAB-lb COMMENT

       The overall effort should include the region where Scarboro Creek reenters Oak Ridge
Reservation (ORR) south of the arboretum.

       Response:  The area in question has been studied and is not considered  to pose any
hazards. The RI/FS for the  South-Campus Facility (DOE/OR/02-1274/V1&D2) investigated
DOE property west of and including Scarboro Creek. -No unacceptable hazards were found in
the creek,  and a no action ROD (DOE/OR/02-1383&D3) was issued in  December 1995.  The
property east of Scarboro Creek was evaluated in September 1996 in the ER footprint reduction
process, evaluation of Scarboro/East Haw Ridge study area (DOE/OR/01-1496&D1) and has been

nOXMMlO.IMA/MBH                             3-12                                 Aprt 29. 1997

-------
approved for release to the public. This document states "Findings indicate that no public health
concern should arise because of past and present federal activities within the study area." Also,
"The possibility of groundwater contamination from other affected areas of the ORR exists, and
future groundwater use restrictions may be determined necessary.  When and if the study-area
is considered for transfer to a non-DOE use, additional sampling will be necessary to determine
the need for groundwater use restrictions."  DOE does not consider it necessary to expand the
scope of the Union Valley interim action to include this area because (1) the water,  in the creek
presently meets regulatory requirements, (2) TDEC is monitoring the creek and would recognize
if contamination could migrate onto this property, and (3) the existing footprint reduction process
would ensure investigation of future uses and protection from any projected risk.

SSAB-2 COMMENT

       Many small readings are reported and then discounted.  When questionable readings are
obtained, they should be checked using more sensitive or reliable apparatus.

       Response:  The Upper EFPC remedial investigation is analyzing existing and new data
outside the scope of this interim action.  Results of analyses that report low concentrations are
not discounted. The concentrations are compared to risk-based standards promulgated either by
the state or  federal government.  When concentrations do not exceed these standards, they are
not considered to be  an imminent concern.   DOE evaluates low-level readings to determine
whether they represent the leading edge of a plume.  Multiple rounds of data have been collected
from some of the Union Valley sampling locations.  The data typically are compiled and plotted
to evaluate  trends.   Therefore, if a low concentration  is followed by successively  higher
concentrations, the significance is noted and considered during data analysis.

SSAB-3 COMMENT

       The proposed license system resembles buying short-term rights to pollute groundwater
under the grantors land,  an unacceptable concept used alone for a 5-year period.

       Muponse:  The license system does not purchase rights to pollute.  It protects the public
from existing  pollution caused by  historic releases of contaminants.   To  the  best of our
knowledge,  most of the carbon  tetrachloride was  likely  released before  1946 during the
Manhattan Project when ER and waste management were not given a high priority. Significant
effort and expenditure is underway to  investigate existing contamination, determine its risk,
evaluate risks from other potential sources, and develop responsible and cost-effective remedial
actions that  will protect human health and the environment.

/TOOMMKUMA/MBH                              3-13                                  April 29. 199?

-------
SSAB-4 COMMENT

      Plans to notify local government are too vague.  Recording the licenses at the Registrar
of Deeds office should be considered.

      Response:  The responsibilities for notification are clearly established in the "Selected
Remedy" section of this ROD.  This is a tripartite agreement among DOE, EPA, and TDEC with
sufficient checks and balances to ensure compliance for the approximately 4-year interim action.

SSAB-5 COMMENT

      A revised document should be made more understandable to the general public.

      Response:  Your oraineitf fe apjpreclated/ Tne into^
gNM^pi&licatxt with the iiitetf                              TJbepui^oseof ismt£%the
proposed plan and the subscquott {n^rc moetb^ was m
public: m selection of an interte response u> address aay potential threat from
growadwater a* Union Va0ey.  If p&tfc comments had
situation or «a»wd DOB to alter ifee selected remedy, «rwis^ proposed p)^ could nave been
issued.  However* comments received indicated an appreciation of the situaooa and general
concucrence wkh the preferred alternative selected as the Interim re^>onse, Thu$^ ins^ad ol
retsailag the proposed plaz^ DOB Is providmg responses to pubfib comments bi this sectbn of
the ROD* according to provisions and requiremeitts under CERCLA.

SSAB-6 COMMENT

       Please indicate the source of  standards  and the method used to obtain  contaminant
standards.

       Raponse: Three sets of standards were used for comparison in the evaluation of the
Union Valley data.   The  first set is the EPA primary drinking water standard, called the
Maximum Contaminant Limits (40 CFR 141). This risk-based set of standards is promulgated
by the federal government. The second set is a set of background values for naturally occurring
inorganic constituents in groundwater.  The background values were established by the Lockheed
Martin  Energy Systems (Energy  Systems) Groundwater Protection Office on the basis of
/TOOMMIO.IMA/MBH                          ' 3-14                                April 29, 1997

-------
                                                                                            1
statistical analysis of data from monitoring wells at the Y-12 Plant (Energy Systems 19965). The
third set of standards is the list of preliminary remediation goals developed by Energy Systems
for the preliminary risk evaluation (ORNL  1995).

SSAB-7 COMMENT

      The above  comments are based on  a concern that the reported observations show the
leading edge of a serious groundwater plume.

      Response:  It is not yet dear whether the contaminants detected indicate the leading edge
of a plume that is expanding eastward in Union Valley. As described in Part 2 under "Summary
of Site Characteristics,"  Public-1 Response, and Public-7 Response, it is believed that the plume
does not continue past the groundwater discharge point at the Scarboro Creek springs. Additional
investigation is underway  for the Upper EFPC CA that will more clearly define the fate and.
transport of contaminants in the plume.

SSAB-8 COMMENT

      The interim Proposed Plan for the Union Valley Upper EFPC CA is based on the "Union
Valley Interim Study Remedial Site Evaluation"  (Y/ER-206/R1, February 1995).  The TDEC,
DOE Oversight Division, commented on this document in a letter dated June 2, 1995. The "UV
Interim Study Remedial  Site Evaluation" has not been redrafted in response to these comments.
In this letter, a number of significant concerns were described, including questionable analyses
of data and assumptions on the hydrogeology of the site. How have the concerns in this letter
been addressed?
                  *,
           ^ - -i	
      Response:  Responses  to the comments were prepared and submitted to TDEC shortly
after the comments were received. The Union Valley interim study suggested that there were no
current risks, only potential future risk if groundwater use changed. The study recommended no
interim action. TDEC responded that the potential risk and potential for additional expansion of
the groundwater plume justifies the need for interim action.  This ROD was prepared to address
TDEC's concerns. TDEC concurs with this ROD.  The interim study will not be revised and
reissued, and the analysis and evaluation of contamination in Union Valley originating from the
Upper EFPC CA, incorporating other valid concerns of TDEC, will be completed as part of the
Upper EFPC RI.  Analytical methods have been changed based on TDEC comments, and more
reliable  radionuclide analyses are  now being conducted.  TDEC will approve all CERCLA
documentation for Upper EFPC CA and will sign the final ROD.
mnMMlO.IMA/MBH                           3-15                                 Aprt ». 1997

-------
                                                                                              1
SPECIFIC COMMENTS

SSAB-9 COMMENT

       Page 1. Introduction. Paragraph 3:  The word "limit" as used here suggests that DOE
would approve of some level of "unacceptable activities." The word "limit" should be replaced
with the word "prohibit."

       Response: Set response tO;SSAB-5 Comment,  Similar language in this ROD  has been
modified as suggested.

SSAB-10 COMMENT

       Page 3.  Paragraph 1:  In this paragraph,  it is  stated that there are six groundwater
monitoring wells in Union Valley.  These six wells actually consist of two locations, with three
wells at each location  (each well  monitoring a different depth).   These wells appear to be
inadequate to characterize and monitor changes in the plume and should be supplemented.  Please
explain clearly that only two locations are involved and why only two locations are adequate.

       In the last line of this paragraph, it is stated that "No contamination has been found in the
groundwater  at the  quarry."  Please describe the extent of sampling activities that have been
conducted at  the quarry and how certain DOE is that no contamination exists there.

       Response: Refer to Public-9 Response for the issue  of the adequacy of the six wells.

       With respect to the issue of contaminants in the quarry, five samples have been taken from
a spring that  is discharging groundwater  from one of the quarry walls. The most recent sample
taken from the quarry  was in early June 19%.  The samples have been analyzed for volatile
organic compounds (VOCs),  which include carbon tetrachloride  and other chlorinated solvents
in the  plume, as well as inorganics (such as nitrate), metals, and radionuclides.  The samples
have never detected VOCs.  The inorganics, metals, and radionuclides that have been detected
have been at very low concentrations, either below the background values or below the standards
described in SSAB-6 Response.
jnXXMMIO.IMA/MBH                             3-16                                Apr! 79. 1997

-------
SSAB-11 COMMENT

      Page 3. Paragraph 2:  In describing the use of water from Scarboro Creek for irrigation
at the Arboretum, the text states that "Some potentially hazardous constituents have been detected
in the springs that feed Scarboro  Creek, but the source of these constituents  has not been
confirmed, nor has any  risk from those constituents been established."   Please list which
contaminants  and the levels of contamination  that have been found in Scarboro Creek and
describe what actions are being taken to determine the source of these constituents.  Also, please
indicate what precautions are being taken to prevent adverse effects on human health and the
environment from the use of water from Scarboro Creek.  Human health and the environment
should be protected even though the source of the contamination has not been confirmed.

      Response: In addition to carbon tettachloride, other VOCs, metals,  and radionuclides
have been detected in surface water.  A complete listing of contaminants and concentrations
detected  in groundwater and surface water  in Union Valley is provided  in the Union Valley
Interim Study Remedial Site Evaluation (ORNL 1995).  The relationship between the low levels
of surface water contamination and releases from the Y-12 Plant is unclear. This relationship will
be clarified in the Upper EFPC  CA RI; however, identification of other potential sources'in
Union Valley is outside the scope of the RI.  The state of Tennessee is initiating investigations
of off-site sources.

      At this time, no precautions to protect human health or the environment in Scarboro Creek
are necessary. Should unacceptable contaminant levels be detected during monitoring by DOE
or TDEC, precautions will be taken as described in SSAB-12 Response.

SSAB-12 COMMENT

       Page  3.  Paragraph  3:   Although  this interim action  is  intended only to address
contamination resulting from  operations in  the Upper EFPC CA, plans to investigate other
potential sources either by DOE, TDEC, USEPA or another agency should be described.

       Raponse:  As described in Public-17 Response, the TDEC Division of Superfund  is
initiating an investigation of other potential sources  in Union Valley.  TDEC DOE Oversight
Division and  Division of Water Quality monitors contaminant levels in Scarboro Creek.  Should
contamination be detected  above  acceptable limits,  TDEC  could choose to post  the creek,
establishing the uses that are acceptable and those that are prohibited.   To date,  no such
restrictions are necessary. Also, see SSAB-17 Response for a description of the DOE monitoring
program.

/TOOMMIO.IMA/MBH                             3-17                                 April 29. 1997

-------
SSAB-13 COMMENT

       Page 5. Paragraph 2:  In this paragraph, it is stated that the plume is assumed to be
contained in the Maynardville Limestone.  Please describe the basis of the assumption that the
plume is contained in the Maynardville Limestone and the degree of certainty that this assumption
is correct.  The assumption is questioned in the letter dated June 2, 1995, from TDEC, DOE
Oversight Division, to DOE.

       Also in this paragraph,  it is stated that "Little  contamination is expected  at  300 m
(1,000 ft) and below because there are fewer developed karst  features at those depths and the
formation is tighter." Is this conclusion based on a literature review or have core samples been
collected in Union Valley to confirm this theory?  This is especially important near the source
of the plume where DNAPL is suspected to be present.

       Response:  Regarding containment of the plume in the  Maynardville Limestone, please
refer to Public-1 (paragraphs 4 and 5), Public-6, and Public-7 Responses. With respect to the
reference to the TDEC comment from 199S, responses were prepared and submitted to TDEC
and additional actions are being taken (see SSAB-8 response).

       With respect to the depth of contamination, the statement is based upon our understanding
of the groundwater flow and transport as summarized in the site conceptual model. Many lines
of evidence and data, including core evaluation, entered into the development of the model.
Deep multiport monitoring wells at the east end of the Y-12 Plant GW-722 and GW-131 confirm
the vertical extent of contamination. GW-722, in particular, intersects the carbon tetrachloride
plume, and samples below approximately 170 m (550 ft) do not exhibit contamination.
                    «,

SSAB-14 COMMENT

       Page 5. Summary of Risks. Paragraph 1: In this paragraph, it is stated that a number of
organic, inorganic, and radioactive constituents were detected in Union Valley groundwater and
surface water, but that the carbon tetrachloride-dominated plume is of particular interest because
it originates from the Upper EFPC CA.  Please include in the document what the source(s) of
the other contaminants is  (are) and how they are being addressed.

       Response:  Identification of other source(s) of contaminants is beyond the scope of the
Upper EFPC CA RI, and  these sources, if any,  have not  yet  been  evaluated.  TDEC is
 STOOM96IO.IMA/MBH                            3-18                                 Apri 29.

-------
investigating other potential sources (see Public-17 and SSAB-12 Responses).  The institutional
controls in the interim selected remedy should prevent unacceptable human exposure regardless
of the source of contamination.

SSAB-15 COMMENT

       Page 5. Summary of Risks. Paragraph 3:  The last sentence says that "Ecological risk
evaluations were not included  in the  Union  Valley  interim study."   Please state  whether
ecological risk evaluations will be included in the Upper EFPC CA remedial investigation.

       Response: Ecological  risk evaluation is part of the Upper EFPC RI and results of the
evaluation will be included in the RI report.

SSAB-16 COMMENT

       Page 5. Summary of Risks. Paragraph 4: In the last sentence, it is stated that "... some
constituents could be found to originate from the municipal landfill or from other sources and
would be outside the scope of this interim proposed plan."  Although the municipal landfill and
other sources may be outside of the scope of the  plan, they are still a concern of the public.
Therefore, the responsible local government agency should be  notified  and reference to this
notification should be included in  the plan.  Please identify the municipal landfill and show the
location.

       Response:  The golf driving range (119 Union Valley Road), which is north of and
adjacent to the UT Arboretum,  is located on the former  Oak Ridge landfill.  The location  is
shown in Figure 2.2 of this  ROD. The landfill  reportedly received municipal solid wastes.
According to the Oak Ridge Community Development  Office, Management Services, Inc.,
managed the landfill from the 1940s until it was acquired by the city in 1961. The exact closure
date of the landfill is uncertain, but the lease to the driving range started on July 31.  1967. The
TDEC Division  of Superfund is investigating the landfill.

SSAB-17 COMMENT

       Page 6. Description of Alternative 2 (Institutional Controls):  There is no mention of a
groundwater or  surface water monitoring program to ensure that the proposed institutional
controls are adequate. The monitoring program that will be in place should be described (e.g.,
which monitoring wells and surface  water locations would be sampled, sample  frequency,
constituents analyzed).

m«W96IO IMA/MBH                          '  3-19                                  Ajri 29. 1997

-------
      Response: The .purpose of this ROD for interim actions is to protect human health by
ensuring that no one drinks potentially contaminated groundwater or surface water.  The only
monitoring needed to ensure this protect!veness is of water  use, not contamination levels.
Institutional actions are intended to preclude and monitor use. Outside the scope of this interim
action ROD, an integrated monitoring plan for the ORR has been drafted and is being reviewed
by DOE.  In that plan, Union Valley monitoring includes the six monitoring wells (GW-169,
GW-170, GW-171, GW-172, GW-230, and GW-232) sampled twice a year with analysis for
VOCs and gross alpha and beta activity. Springs SCR7. ISP, SCR7.18SP, and the Rogers Group,
Inc., quarry spring also would be sampled twice a year with analysis for VOCs and gross alpha
and beta activity. Spring SCR7.8SP would be sampled twice a year for VOCs.  Note that the
plan is  in review and these locations, frequencies, and analyses could change.   TDEC will
perform additional sampling at the wells, springs, landfill, and  in Scarboro Creek.

SSAB-18 COMMENT

      Pace 6 ("Institutional Controls") and Page 8 ("Short-Term Effectiveness"):  Annual title
searches are discussed on Page  6 ("...DOE would  institute an annual title search...") and on
Page 8 (".. .ensured by DOE's annual title searches and notifications...").  Please explain exactly
who would do the title searches and describe what mechanisms will be in place to ensure that
annual title searches are conducted.

      Response: The responsibilities for performing the title searches are  described in the
"Selected Remedy" section of this ROD. Ensuring compliance with this requirement is addressed
in SSAB-4 Response.

SSAB-19 COMMENT

      Page 9. Costs. Paragraph 1: In this paragraph, the assumed 6-year duration of the interim
actions  is referenced.  Please explain why the license term is six (6) years instead of five
(5) yean as stated in Item 2 of the license?

      Rtaponse: When the interim proposed plan was written, the projected date for issuing the
Upper EFPC CA ROD was the year 2002.  The 6-year period suggested in the proposed plan was
intended to end approximately  when the  new ROD is issued.  The current schedule expects
completion of the final ROD by 2000. The draft license agreement attached to the proposed plan
and the signed agreements  have 5-year terms, and provisions  for canceling or  renewing the
licenses.  The discrepancy was not intended, but should not affect the reliability of the license
agreements in protecting public health or preventing  actions that could spread the contamination.

mno«Mio.iMA/MBH                            3-20                                 **** ». «w

-------
                OAK RIDGE ENVIRONMENTAL PEACE ALLIANCE
                                   LINDA EWALD
                                   August 24, 1996

OREPA-1 COMMENT

      In general, the preferred alternative is better than no action at all concerning the Union
Valley groundwater problem; however, I am concerned about a general weakness of information
and assumptions that were made  in.the proposal.   It states that there are six- groundwater
monitoring wells in Union Valley.  There are just two locations with three wells each, and they
are' inadequate to characterize and monitor changes in  the plume.   It  also states that  "no
contamination has been found in the groundwater at the quarry" without describing any sampling
activities to prove the certainty. It refers to the use of Scarboro Creek water for irrigation of the
arboretum and that "some potentially hazardous constituents have been detected in the springs...
but the source has not been confirmed." Please indicate which contaminants have been found in
Scarboro Creek and what actions are being taken to determine the source. Also what precautions
are being taken to prevent adverse effects on human health and the environment?

      Response: Please see Public-9 Response regarding well locations in Union Valley.  See
Part 2, "Summary of Site Characteristics," for current interpretation of data.   See SSAB-10
Response regarding sampling in the quarry and SSAB-11 Response regarding Scarboro Creek.
The institutional  controls proposed in this ROD will protect human health. No interim actions
address  adverse  effects,  if any, to the environment.  No environmental impacts  have been
identified.

OREPA-2 COMMENT

      The two assumptions of concern are that the plume is contained in  the Maynardville
Limestone.  A tracer test conducted by the state indicated that groundwater  flow in the Knox
Group could be up-dip, cross-strike or along dissolutionally enhanced joints in three directions.
And that "little contamination is expected at 300 m (1,000 ft) and below, because there are fewer
developed karst features and the formation is  tighter."   Have core samples  been collected to
confirm this theory?      .

      Response: Please see SSAB-13 Response.
n«)M96IO.IMA/MBH                            3-21                                 Apri 29. 1997

-------
QREPA-3 COMMENT

      Since ecological risk evaluations were not included in the interim study, will evaluations
be included in the Upper EFPC CA remedial investigation? And although contamination from
the municipal landfill or other sources is outside the scope of the interim proposed plan, they are
still a concern of the public.  The responsible local government agency should be notified and
this note included.  Also the overall effort should include the region where Scarboro Creek
reenters ORR south of the arboretum.  And finally, there is not mention of a groundwater or
surface water monitoring program to ensure proposed institutional controls are adequate.

      Response:  Please see SSAB-15 Response regarding ecological risk evaluations, SSAB-16
Response regarding the municipal landfill, SSAB-lb Response regarding ORR property south of
the arboretum, and SSAB-17 Response  regarding monitoring plans.

OREPA-4 COMMENT

      The Union Valley contaminated groundwater plume is a serious situation and I hope this
interim proposal is just the start of serious efforts to address the problem.  Thank you for your
attention.

      Response:  The Upper EFPC CA RI/FS is a serious effort to define the nature and extent
of contamination  on  and  off the main  Y-12 Plant site, predict  the fate and  transport of
contaminants, establish likely risk levels for current and future potential exposure scenarios, and
develop appropriate, cost-effective remedies.
     UNIVERSITY OF TENNESSEE AGRICULTURAL EXPERIMENT STATION
                     RICHARD M. EVANS, SUPERINTENDENT
                                  September 6, 1996

UT-1 COMMENT

       UT owns approximately 450 acres within the "Interim Remedial Action Boundary" as
delineated in Figure 2 of the DOE plan.  This property represents a significant portion of the
UT Oak Ridge Forestry Experiment Station and Arboretum property.  Necessarily, UT is
concerned with any impacts) or encumbrances which may limit full realizations of its research,
educational, and program development potential.
 JTOOM96IO.IMA/MBH                            3-22

-------
       On this property, the University of Tennessee carries out a comprehensive program of
integrated forestry, wildlife, horticultural, environmental, and natural  resources research and
educational programs.  In addition, this land resource is vital to the University's public service
programs at the arboretum, which benefits over 30,000 annual visitors and program participants.
Critical to these programs is the development of various plant collections, demonstrations, and
research plots, which require irrigation for establishment and maintenance. As acknowledged in
the DOE plan, water from Scarboro Creek is presently used to meet these irrigation needs.
However, the University has always  considered  the  use of groundwater  sources in future
development of a more extensive irrigation system.  The potential loss of this irrigation option
is of significant concern to the University. If the .use of groundwater were determined to be an
unacceptable risk, other alternatives, as offered in the plan, would have to be explored.

       Response: DOE intends to cooperate with UT in accordance with the terms of the license
agreement  and pursuant  to  the intent  of this  ROD.  If UT establishes a specific need for
additional irrigation water resources beyond the surface water currently available, determines that
extraction of groundwater is the most economic source  of supply, and notifies DOE 90 days in
advance of its plans, then DOE will evaluate the proposed use and determine whether the use is
unacceptable.  If the use is unacceptable because of current or historical DOE actions, then DOE
will negotiate in good faith with UT to establish other resources such that UT's programs are not
adversely affected and the cost to UT would not exceed the cost had the  groundwater been
available.

UT-2 COMMENT

       It is well  known, and  acknowledged in the plan, that visitors  to the arboretum often
"explore"  Scarboro Creek and, in the process, come in contact with the water, wading or
otherwise.  Not addressed in the plan is the  fact that Scarboro Creek is often used in the study
of stream life and ecology by school groups in programmed visits to the arboretum, as well as
in some adult-oriented arboretum programs.  In these latter circumstances, contact with the water
in Scarboro Creek is more than casual.  The plan considers the potential health hazards of human
contact with this water and states that, "No potential contaminants of concern were found for this
exposure (wading) scenario." DOE is encouraged to consider an expanded "scenario" addressing
the above described exposures in evaluating  potential human health risk.

       Response: The child-wading scenario referenced  in the interim proposed plan assumes
that 25 percent of an average (age 3-6 years, 33 Ib) child's total body surface area is in contact
with spring/surface water.  The exposure duration is 1 hour per day, once a week for 6 months
of the year for 6 years.  Risks were calculated for dermal exposure and inhalation of volatile

JTOOMMiaiMA/MBH                             3-23                                  Aprt »• «*

-------
contaminants.  Typically, this is considered a conservative scenario (i.e., protective of human
health for both children and adults) because children are more susceptible to contamination than
adults, and  modeled exposure duration is thought to be more lengthy than expected actual
durations.  Furthermore, the highest concentrations of contaminants where the springs emerge
at the headwaters of Scarboro Creek were used in the calculations and volatile contamination is
expected to attenuate downstream from the springs. The Upper EFPC CA RI will continue to
evaluate  contamination  exiting  the  groundwater at spring SCR7.1SP.  TDEC Division  of
Superfund's evaluation of the former Oak Ridge landfill (see Public-17 and SSAB-12 Responses),
TDEC Division  of Water Quality, and  TDEC DOE  Oversight Division will  investigate
contamination in the creek.  If UT believes  that the exposure scenarios described are not
sufficiently conservative, they can contact DOE and identify other exposure durations or pathways
for consideration in the Upper EFPC CA RI/FS.

UT-3 COMMENT

       Prior to receipt of this Plan, DOE and UT negotiated a Real Estate License Agreement
(Recorder-7-96-0155) pertaining  to the  sampling  of groundwater wells and  miscellaneous
environmental sampling.   In the spirit of this  agreement and  a common concern for the
environmental impact of these contaminants on the water and land resources, UT supports and
encourages DOE's efforts in monitoring and remediation. In recognition of  the environmental
linkage of University programs to the land, water, plant, and animal resources on this property,
I request that we be kept fully informed on all future findings and actions which may impact this
property.

       Response:   This ROD  requires annual notification of parties to license  agreements
updating them on the status of  the environmental investigations.  Any special findings during
investigations that indicate a potential to adversely impact public health will be immediately
communicated to all affected parties.
 JltHMMIO.lMA/MBH                          '  3-24                                 Apri ».

-------
                                     T. R. WOOD
                             104 MEADOWLARK LANE
                               OAK RIDGE, TN 37830
                                  September 4, 1996
WOOD-1 COMMENT
      I would like to provide a  comment on the interim proposed  plan for  the Union
Valley/Upper East Fork Poplar Creek area.  I am concerned about the institutional controls,
restrictions in groundwater use, and future uses for the areas impacted by the groundwater plume.

      The areas involved are planned for industrial development as a primary land use. Several
manufacturing and commercial offices are established. One concern I would have would be that
restricting the use of groundwater for industrial  (nondrinking water) purposes might limit the
potential for future growth.  An industry needing process water might not locate here if these
restrictions apply, which would severely limit the future designated land use. Existing industries,
such as Rogers Group, Inc., quarry  operations, will  be limited in their growth potential.  They
presumably will be limited in their ability to dewater the quarry pit and the life of the mine will
be reduced. (If contaminants are detected in their quarry pit pumping operations, will DOE pay
to clean them up? Since the source of the contamination is DOE operations, I do not see where
the quarry should be found liable!)

      I would like the institutional controls to be limited to restricting targeted land/groundwater
use, such as housing with residential wells, but I would not like to see industry restricted in any
way.  DOE should pay to remove any solvents that would need to be removed by process water
extraction wells within the time limits  of natural attenuation of the contaminants in this area.
Even use of the water to irrigate a golf course should not be considered unreasonable!

      In addition, the institutional controls should not limit the future surface use of the land,
if for example, the Rogers Group, Inc., quarry were to close and the area were to be used as a
park or a future elementary school site for the new Rivers  Run and Parcel A communities.  This
future land use should be allowed. The lands owned by the city of Oak Ridge in the area should
also be  likewise unencumbered.  The available  land in Oak Ridge is scarce enough, without
unreasonable restrictions applied to  land that was previously  contaminated by DOE, but is now
owned by  others.   Off-site releases  are not usually mitigated by institutional controls  on
groundwater; if this precedent is carefully crafted, it may be a landmark event for  DOE.  The
precedent will also help reuse efforts at other on site  areas of groundwater contamination. Let's
think this through carefully!

/TDOW96IOIMA/MBH                             3-25                                  Afrt 29. 1997

-------
      Response:  DOE shares your concern regarding restrictions on any uses, particularly
industrial uses, on any property on or off of the ORR.  However,  in the  interest of protecting
public health  from existing contamination from historical releases,  the interim  restrictions
required by this ROD are necessary until enough information is available and reasonable actions
to correct the problems can be evaluated and implemented.

      It is true that restricting groundwater use might limit use of the property for certain water-
intensive industries and limit the potential for future growth. DOE believes that this restriction
is not as severe as characterized in your letter.  Most of the existing industries in this area are
not large users of water. Because of the abundance of surface water in East Tennessee, those that
are typically are located near surface water sources rather than groundwater sources.  Regardless
of contamination levels, it is unclear whether the aquifer in Union Valley can yield a sufficient
quantity of water for some industrial uses. City of Oak Ridge water  is available, and surface
water from Melton Hill Lake is nearby and could be accessed for industrial use.

      Continued dewatering at Rogers Group, Inc., quarry or expansion of their quarrying
activities is not expected to affect the contamination plume  (see Public-7 Response).  The only
concern at Rogers Group, Inc., quarry is if the owners use groundwater for drinking; this is only
a potential future  concern because  no contaminants have been detected  at the quarry.  Any
drinking water source would  need to be treated  for  naturally occurring  bacteria and other
pathogens.  DOE is responsible for the contamination associated with  the carbon tetrachloride-
dominated plume.   Other panics may be responsible for other contamination in Union Valley.
If remediation is not technically possible (see SSAB-la Response) or the remediation cost to DOE
and the  taxpayer is not commensurate with the  added value that water intensive industry could
provide, then groundwater use restrictions may be the most appropriate way to protect human
health and prevent the spread of contamination.

      The interim proposed plan and this ROD do not prohibit groundwater use. Owners are
required to notify DOE if new uses are proposed  or if the property is to be sold.  DOE will
investigate proposed new uses and,  only if they are unacceptable, negotiate an agreement with
the property owner.  Because the  negotiated  agreement would be acceptable to the owner,
industrial development under  the restrictions necessary to protect the public should not be
impeded.
JTOXMMIO.IMA/MBH                             3-26                                  Afrt 29. 1997

-------