PB95-964031
                                 EPA/ROD/R04-95/240
                                 February 1996
EPA  Superfund
       Record of Decision:
       Woolfolk Chemical Works Site,
       Operable Unit 2, Fort Valley, GA
       9/29/1995

-------
                  RECORD OF DECISION




      SUMMARY OF REMEDIAL ALTERNATIVE SELECTION
             WOOLFOLK CHEMICAL WORKS  SITE




          FORT VALLEY,  PEACH COUNTY,  GEORGIA




OPERABLE UNIT #2: CONTAMINATION OF SOIL ON PROPERTIES




   BETWEEN  MARTIN LUTHER KING  DRIVE AND OAK  STREET




         PROPOSED FOR A REDEVELOPMENT PROJECT
                       PREPARED BY




            U. S. ENVIRONMENTAL PROTECTION AGENCY




                        REGION IV




                     ATLANTA, GEORGIA

-------
                                       DECLARATION
                                             of the
                                  RECORD OF DECISION

                          WOOLFOLK CHEMICAL WORKS SITE
 'Operable Unit Two:  Soil Contamination ofMLKJOak Street Properties Proposed
                                for a Redevelopment Project

SITE NAME AND LOCATION

Woolfolk Chemical Works Superfund Site, Fort Valley, Peach County, Georgia

STATEMENT OF BASIS AND PURPOSE

This decision document (Record of Decision) presents a selected remedial action for Operable Unit (OU) #2
at the Woolfolk Chemical Works Site, Fort Valley, Georgia, developed in accordance with the
Comprehensive Environmental Response, Compensation and Liability Act of 1980 (CERCLA),-as amended
by the Superfund Amendments  and Reauthorization Act of 1986 (SARA), 42 U.S.C. Section 9601 et sep,., and
to the extent practicable, the National Contingency PlarvtNCP), 40 CFR Part 300.  This decisitfh is based on
the administrative record for OU #2 at the Woolfolk Chemical Works Superfund Site ("the Site").
The State of Georgia, as represented by the Georgia Environmental Protection Division (GaEPD), has been
the support agency during the Remedial Investigation and Feasibility Study process for the Site. In
accordance with 40 CFR 300.430, as the support agency, GaEPD has provided input during this process.
The State of Georgia has deferred to EPA on efficacy of the selected remedy.

ASSESSMENT OF THE SITE

Actual or threatened releases of hazardous substances from OU #2 at the Woolfolk Site, if not addressed by
implementing the response action selected in this Record of Decision (ROD), may present an imminent and
substantial endangerment to public health, welfare and/or the environment.

DESCRIPTION OF SELECTED REMEDY

This operable  unit is the  second of three planned operable units at the Woolfolk Site. OU #1 addressed the
contamination of groundwater, while OU #2 will address contamination of soils in a proposed redevelopment
project to be implemented on properties on Martin Luther King Drive and Oak Street in Fort Valley, GA.
OU #3 will address remaining contaminated soils,  surface/storm water, structures, and sediment at the Site.

Due to the past removal actions at the site, limited further action  will be required on the thirteen (13)
properties proposed for a redevelopment project as discussed in this Record of Decision (ROD). In order to
implement this remedy, EPA will require:

       • land use consistent with the proposed redevelopment plan for the new Peach County Library
       Building;

       • land use consistent with the renovation  of two existing structures located at 201 Oakland Heights
       and 202 Oak Street for the purpose of an office building and an adult education center, respectively;
       and,

       • placement of institutional controls to ensure that future land use is non-residential and
       groundwater beneath  the site cannot be used for any purpose as stipulated in this Record of
       Decision.

EPA has entered into a Prospective Purchaser Agreement with the Peach County Libraries Board, the Fort
Valley Redevelopment Authority, and the Peach County Chamber of Commerce.  The ROD is based on the
assumption that proposed properties will be transferred to these entities and redeveloped for use as a

-------
 library, an office building, and an adult-education center.  If this project does not proceed, it will be
 necessary to review this record of decision.  Progress of the redevelopment project and whether or not the
 remedy remains protective will be periodically reviewed by EPA.

 STATUTORY DETERMINATIONS

 The selected remedy is protective of human health and the environment, complies with federal and state
 requirements that are legally applicable or relevant and appropriate, and is cost-effective. The remedy
 utilizes permanent solutions and alternative treatment technologies to the extent practicable, although it
 does not satisfy the preference for  treatment due to the limited volume and concentration of the
 contamination. Finally, implementation of OU #1 actions will require groundwater to be pumped and
 treated if contamination is found beneath the OU #2 properties above the performance standards set in OU
 #1.

 Because this remedy will result in hazardous substances remaining at the Site, a review will be conducted
 within five years after commencement of the remedial action and, thereafter, to ensure that the remedy
 continues to provide adequate protection of human health and the environment.
RICHARD D. GREEN                            DATE
ASSOCIATE DIRECTOR
OFFICE OF SUPERFUND AND EMERGENCY RESPONSE

-------
                                     Table of Contents
                             Record of Decision: Operable Unit #2
                        Woolfolk Chemical Works Site, Fort Valley, Georgia
 1.0  SITE LOCATION AND DESCRIPTION 	  1

 2.0  SITE HISTORY AND ENFORCEMENT ACTIVITIES	  3

 3.0  HIGHLIGHTS OF COMMUNITY PARTICIPATION	  4

 4.0  SCOPE AND ROLE OF OPERABLE UNITS	  5

 5.0  SUMMARY OF SITE CHARACTERISTICS	'	  5
          5.1  GEOLOGY/PHYSIOGRAPHY	  5
          5.2  HYDROGEOLOGY	  6
          5.3  MEDIA CONTAMINATION	'.	  7
           5.3.1 SOIL CONTAMINATION	  7
           5.3.2 GROUNDWATER CONTAMINATION  	  8
           5.3.3 SURFACE WATER AND SEDIMENT CONTAMINATION	  8
           5.3.4 STRUCTURE CONTAMINATION  	  9
           5.3.5 AIR CONTAMINATION	  9

6.0  SUMMARY OF SITE RISKS	  9
          6.1  CHEMICALS OF CONCERN	  10
          6.2  EXPOSURE ASSESSMENT	  10
          6.3  TOXICITY ASSESSMENT	  14
          6.4  RISK CHARACTERIZATION	  14
          6.5  ECOLOGICAL RISK/HISTORICAL SITES	  16
          6.6  PERFORMANCE STANDARDS	  16

7.0  DESCRIPTION OF ALTERNATIVES	;	  18
          7.1  ALTERNATIVE 1: NO ACTION	  19
          7.2  ALTERNATIVE 2: INSTITUTIONAL/ENGINEERING CONTROLS	  19
          7.3  ALTERNATIVE 3: EXCAVATION WITH ON-SITE DISPOSAL  	  19
          7.4  ALTERNATIVE 4: EXCAVATION WITH OFF-SITE DISPOSAL 	  19
          7.5  ALTERNATIVE 5: INST. CONTROLS/EXCAVATION WITH OFF-SITE DISPOSAL	  19

8.0  SUMMARY OF THE COMPARATIVE ANALYSIS OF ALTERNATIVES	  20
          8.1  OVERALL PROTECTION OF HUMAN HEALTH AND THE ENVIRONMENT	  20
          8.2  COMPLIANCE WITH ARARs	  21
          8.3  LONG-TERM EFFECTIVENESS AND PERMANENCE	  22
          8.4  REDUCTION OF TOXICITY. MOBILITY. OR VOLUME THROUGH TREATMENT	  22
          8.5  SHORT-TERM EFFECTIVENESS	  22
          8.6  IMPLEMENTABILITY	  22
          8.7  COST	  23
          8.8  STATE ACCEPTANCE 	  23
          8.9  COMMUNITY ACCEPTANCE	  23

9.0  SUMMARY OF SELECTED REMEDY 	  23

 10.0  STATUTORY DETERMINATION	  26
          10.1  PROTECTION OF HUMAN HEALTH AND THE ENVIRONMENT	  26
          10.2  APPLICABLE OR RELEVANT AND APPROPRIATE REQUIREMENTS (ARARS) 	  26
          10.3  COST EFFECTIVENESS	  26

-------
             10.4  UTILIZATION OF PERMANENT SOLUTIONS	  26
             10.5  PREFERENCE FOR TREATMENT AS A PRINCIPAL ELEMENT	  26
             10.6  STATUTORY PREFERENCE	  26

 11.0  DOCUMENTATION OF SIGNIFICANT CHANGES  	  27
                                      ********************************
                                             List of Figures
Figure 1.1: Area Map
Figure 1.2: Site Map
1
2
                                              List of Tables

Table 6-1: Contaminants of Concern for Surface Soils of Operable Unit #2	   11
Table 6-2: Critical Toxicity Values (Slope Factors/ Reference Doses)	   13
Table 6-3: Risk Characterization Summary for Current Use Scenarios	   15
Table 6-4: Risk Characterization Summary for Future Use Scenarios	   151
Table 6-5: Summary of Uncertainties with Risk Assessment  	   15
Table 6-6: Soil Performance Standards	   17
Table 7-1: Operable Unit #2 Alternatives	   18
Table 8-1: Breakdown of Evaluation Criteria	   20
Table 9-1: Soil Performance Standards	   25

-------
                                       Record of Decision
                                        Operable Unit #2
                                  Woalfolk Chemical Works Site
                                   "•.'  Fort Valley, Georgia
1.0  SITE LOCATION AND DESCRIPTION

The Woolfolk Chemical Works Site is located in Fort Valley, Peach County, Georgia, and includes
approximately 31 acres including the former WobTfolk Chemical Works plant and surrounding areas where
contamination has spread. Businesses operating on the property of the former Woolfolk plant include
SurePack, Inc., Georgia Ag Chem, Inc., and the Marion Allen Insurance and Realty Company.
Canadyne-Georgia Corporation (CGC) also owns a one acre parcel of Site property but does not maintain
an active business at the Site.  SurePack, Inc.  continues to formulate, package, and warehouse various
organic pesticides that are used primarily in the lawn and garden market but also by peach growers.

The Woolfolk Site is located in an area with mixed commercial and residential uses. Residences are
located to the west, south, and east, with homes to the  southeast adjoining a pecan  orchard. Several
businesses and light industries are located along the north, northwest, and east ends of the former plant,
including the Norfolk Southern Railroad tracks and station.

For an area Location map and general Site map, see Figures 1.1 and 1.2, respectively.
                                                                                WOOLTOLK cmvicM. HTC
                                                                            rom  v»nrr. rt>cx COOKTY. CCORCU
                                                                                 sire IOCATIOM DUCKAU
                                            Figure 1,1: Area Map

-------
                               V
WOOLFOLK CHEMICAL WORKS  SITE

     OPERABLE UNIT 2 PROPERTIES
         FORT VALLEY, GEORGIA
         0
         i
         SCALE
100
200
       FEET
           Figure 1.2: Site Map

-------
2.0  SITE HISTORY AND ENFORCEMENT ACTIVITIES

Since the 1920's, the Woolfolk facility has been used for the production and packaging of organic and
inorganic insecticides (including arsenic and lead-based products), pesticides, and herbicides. During
World War II an inorganic intermediate (arsenic trichloride) was reportedly produced at the facility for the
War Production Board.  Production was expanded during the 1950's to include the formulation of various
organic pesticides, including DDT, lindane, toxaphene, and other chlorinated pesticides. These organic
pesticides and other insecticides and herbicides were formulated, packaged, or warehoused at the facility.

The J. W. Woolfolk Company owned and operated the Woolfolk Facility from 1926 until 1941, when it
dissolved and conveyed its assets to Woolfolk Chemical Works, Ltd.  Woolfolk Chemical Works, Ltd.,
reorganized into the corporation Woolfolk Chemical Works, Inc., in 1972.  In 1977, Reichold, Limited
acquired all of the stock of Woolfolk Chemical Werks, Inc. pursuant to a stock purchase agreement. The
stock purchase agreement was assigned to Canadyne Corporation, a wholly owned subsidiary of Reichold,
Limited. In 1984,  Woolfolk Chemical Works, Inc., changed its name to Canadyne-Georgia Corporation
(CGC).  Also in 1984, assets  of Woolfolk Chemical Works, Inc. were sold to the predecessor of Peach
County  Properties, Inc. (PCPI).  PCPI is the current owner of most of the  former Woolfolk property, and
has leased most of the property to its affiliate, SurePack, Inc., which has formulated and packaged
pesticides at the facility since 1984.  Another portion of the property is leased to Georgia Ag. Chemicals,
which operates a warehouse and distribution facility. CGC currently retains the title to a one acre parcel
of the facility used as a landfill. Marion Allen Insurance and Realty Company also owns one parcel
located northwest of the operating facility. (See Figure 1.2).

In 1986-87, Reichold, Limited funded an interim soil remediation at the Woolfolk facility, with Applied
Engineering Sciences (AES) serving as construction manager.  The major  remediation activities consisted
of demolishing several buildings and excavating approximately 3,700 cubic yards of soil contaminated with
a combined lead and arsenic concentration above 10,000 mg/kg. All soil with contamination levels above
this concentration was disposed of at a permitted hazardous waste landfill in Emelle, Alabama. Other
soils and debris were disposed of underneath an on-site cap on property currently owned by CGC.  CGC
informed the Georgia Environmental Protection Division (EPD) of the  investigations and cleanup
activities. In August 1987, AES submitted a document to EPD entitled "Cleanup Report for the Former
Woolfolk Chemical Works Plant Facility" which summarized remedial  activities conducted at the facility

In 1986, the U.S. Environmental Protection Agency (EPA) began an investigation of the release or
potential release of hazardous substances at the facility and requested all analytical data pertaining to the
facility.  This investigation led to the proposal to add the Site to the National Priorities List (NPL) in June
1988. In April 1989, EPA notified potentially responsible parties (PRPs) of their potential liability under
CERCLA for response costs incurred at the Site. In April 1990, EPA and CGC completed negotiations on
an Administrative  Order on Consent (AOC) for a Remedial Investigation/Feasibility Study (RI/FS).  The
AOC was signed on April 24, 1990. In August 1990, the Woolfolk facility  was placed on the NPL.

The Remedial Investigation was submitted to EPA by Canadyne-Georgia in November 1992.  The RI was
performed to document the nature and extent of contamination for affected media, including soils,
groundwater, surface/storm water, sediments and air. The objective of the RI was to gather sufficient
information to develop risk management options and remedial alternatives that are appropriate for the
site. The risk management options are presented in the Baseline Risk Assessment which was submitted
to EPA  in November 1992. In 1993, the site was divided into two Operable Units (OU); OU #1 for
groundwater, and OU #2 for the remaining contaminated areas.  The remedial alternatives for
groundwater are presented in the Final Feasibility  Study (FS) which was submitted to EPA in December
1993. A Record of Decision for OU #1, Groundwater, was issued on March 25, 1994.  In April 1995, EPA
further  divided the site into  OU #2 for redevelopment properties, and  OU #3 for remaining portions of the
site.  CGC submitted a revised FS Addendum (FSA) in May, 1995. In conjunction with the RI/FS, bench
scale treatability tests were performed for the soils and groundwater at the site.  The results of these tests
were used to support the findings of the FS and the FSA.

During  the RI/FS, arsenic contamination  was found in soils in residential yards near the Woolfolk facility.
The removal of residential soil contamination, relocation of some residents, together with demolition of a

-------
dioxin contaminated on-facility building, is being completed pursuant to an Unilateral Administrative
Order for Removal Response activities issued by EPA to CGC, Reichold, Limited, and Canadyne
Corporation on December 1, 1993.  Only CGC has complied with the Order to date.

As mentioned, EPA issued a Record of Decision for the  Operable Unit #1, Groundwater on March 25, 1994.
Canadyne Corporation, Reichold Limited, and Canadyne Georgia were issued an Unilateral Administrative
Order to complete the Remedial Design/Remedial Action on May 23, 1994.  Only Canadyne-Georgia is
complying with the  Order by implementing the on-going Remedial Design activities.


3.0  HIGHLIGHTS OF COMMUNITY PARTICIPATION
                                           *».••
EPA has made significant efforts to insure  that interested parties have been kept informed and given an
opportunity to provide input on activities at the Woolfolk Chemical Works site.  EPA has been working
with the community surrounding the Woolfolk Chemical Works since 1990. In September 1990, press
releases informing the community about the NPL listing of the site were released.  Subsequent interviews
were held that Fall  to develop a Community Relations Plan (CRP).  The information repository was
established in October 1990, at the Thomas Public Library, 213 Persons Street, Fort Valley, Georgia. The
CRP, which was finalized in November 1990, has been placed in the information repository. In January
1991, EPA held a public meeting to discuss the start of the RI/FS.

In July  1993, EPA issued a press release and fact sheet on the findings of the RI study regarding soil
contamination and health precautions recommended by the Agency for Toxic Substances and Disease
Registry (ATSDR).  On August 2-3, 1993, EPA conducted door-to door visits to the potentially affected
residents to further  distribute the fact sheet and extend our invitation to an availability session. The
availability session,  held on August 3, 1993 discussed the results of the RI study and ATSDR's
recommendations for health precautions. Fifty people attended the session which was hosted by EPA,
GaEPD, and ATSDR.  Representatives of CGC were also present.

EPA's Emergency Response and Removal Branch has determined the extent their required actions for
contamination in a drainage corridor extending south of the plant.  EPA has excavated the majority of the
contaminated soils from residential properties, and supervised the destruction of an on-site dioxin
contaminated building (Building E).  Five sampling  events of soils in residents' yards have occurred to
date with results subsequently explained in meetings with the public.  CGC is complying with an
Unilateral Administrative Order (UAO) requiring the disassociation of the affected residents from
contaminated soils and destruction/removal of Building E.

EPA has issued the  ROD for OU#1 after allowing for public participation through the Proposed Plan and
Public Comment period.  The Proposed Plan for OU#1 was issued January 18, 1994 and public comment
was sought from January 18 through February 17, 1994.  A public meeting was also held during this
comment period on February 1, 1994. A Responsiveness Summary was prepared and published as an
appendix to the OU #1 Record of Decision.

Throughout the Removal and Remedial process citizens of Fort Valley, as represented by the Technical
Assistance Group (TAG), have expressed the concern of inadequate information being disseminated by
EPA to the public.  EPA had made available the public repository and the monies for the TAG Grant, but
it was suggested that this was not adequate to get a full understanding of the Superfund process.  In order
to further the exchange of information between EPA and the community, EPA developed a Community
Information Exchange Group. This group of 11 community-selected representatives has met in a public
forum to discuss the activities of the  Woolfolk Site related to OU #2 and OU #3. The series of meetings
has allowed in-depth discussions of the remedial alternatives and provided information to both EPA and
the community relating to activities at this site prior to the formal  proposed plan process.

The  Feasibility Study Addendum (FSA), the Proposed Plan, and the Administrative Record (AR) for OU #2
were released to the public on June 15, 1995.  The FSA and the Proposed Plan  were made available in
both the AR, maintained in the EPA Region IV Docket Room, and the information repository at the site.
The  notice of availability of these documents and the AR was published on July 19, 1995 in various local

-------
 publications. A public comment period was held from July 19, 1995 to September 15, 1995.  In addition a
 public meeting was held on August 29, 1995.  At this meeting representatives from EPA and the State of
 Georgia answered questions about issues at the site and the remedial alternatives under consideration.
 Responses to the comments received during this comment period are presented in the responsiveness
 summary in Appendix A of this document.


 4.0  SCOPE AND  ROLE OF OPERABLE UNITS

 As mentioned in Section 2.0, EPA has organized the work at this Superfund Site into three operable units
 (OUs). The  operable units are:

       •  OU #1: Contamination of the groundwater;
       •  OU #2: Contamination of the soils on properties located on Martin Luther King Drive and Oak
       Street which are proposed for redevelopment; and,
       •  OU #3: Contamination of remaining soils, surface/storm water, sediments, house dust, and
       structures.

 Only limited action is needed at OU #2 due to the past removal actions which have taken place on these
 properties, and assuming the use of the properties in a non-residential redevelopment program. The
 removal actions addressed contamination of the soils from past practices at the Site.  The purpose of this
 OU is to ensure protection of human health and the environment while enabling redevelopment of the OU
 #2 properties consistent with the remediation efforts for the other OUs. In the event that a redevelopment
 project does  not occur on these  properties, this Record of Decision (ROD) will need to be re-evaluated.  OU
 #1 initiated groundwater delineation, collection of data on aquifer response for remediation, and the
 restoration of groundwater to prevent possible future exposure to contaminated groundwater. The ,
 planned OU  #3 will address the remaining sources of contamination at the Site which shall include soils,
 surface/storm water, sediments, house dust, and structures.

Thirteen (13) properties have been proposed for construction of a new library building and renovation of
 two remaining structures for an adult education center and an office building. Local  contributions to  the
 project are being reserved by CGC to supplement a State grant applied for by the Peach County Libraries
 Board to fund the library construction and building renovation project.  Should the grant be awarded,
 construction  of the  library will begin in 1996.  The Fort Valley Redevelopment Authority has also obtained
funds from the Department of Transportation for renovation of the another building.  A Prospective
 Purchaser Agreement (PPA) has been entered between EPA and the Peach County Public Libraries, Fort
Valley Redevelopment Authority, and the Peach County Chamber of Commerce protecting the proposed
 future owners from liability for past contamination and provides for access to the site and non-residential
 use of the properties.


 5.0  SUMMARY OF SITE CHARACTERISTICS

The major Site characteristics presented in the RI/FS Study are summarized below.

 5.1  GEOLOGY/PHYSIOGRAPHY

 •      The Site is located in downtown Fort Valley, which has a population of approximately 9,000 people.
       Surrounding land use is classified as industrial, commercial, and residential.  The majority of the
       former Woolfolk facility  consists of buildings, storage tanks, and  stockpiles of  equipment.  A pecan
       orchard located on the southern portion of the facility is fenced.  Residential properties border  this
       fence  to the  south and east.

 •      To the northeast of the former Woolfolk facility, eighteen (18) properties were contaminated by past
       activities. Under the Removal program these properties were either bought and fenced by CGC, or
       cleaned to a standard set by the removal program for clean-up of residential properties. Thirteen
       (13) of these properties have been bought and most of the buildings have been razed.  These

-------
       properties have been fenced and proposed for non-residential redevelopment.  The properties which
       had soils contaminated with arsenic above 100 ppm were cleaned by removing the soils for final
       disposal at an off-site landfill.

 •      The Woolfolk Site is located in what is physiographically known as the Fort Valley Plateau District.
       This district lies within the Coastal Plain Providence of Georgia just south of the "fall line," which
       marks the boundary between the Piedmont and Coastal Plain Provinces.  This district is
       characterized by broad, flat to very gently rolling surfaces, sloping gently to the southeast. Surface
       soils are moderately drained and generally consist of sandy and silty clays to clayey and silty
       sands.

 •      Several southeast flowing creeks dissect the Fort Valley Plateau District. It is bounded to the west
       by the Flint River and on the east by the Ocmulgee River. Although the Flint River borders this
       district along its western boundary, almost the entire district lies within the drainage basin of the
       Ocmulgee River. Surface runoff leaving the Facility is  collected by the City's storm sewer system.
       The storm water flows generally to the east, southeast  and south discharging to a series of local
       creeks within 1 mile from the facility.  These creeks discharge to Mosy Creek approximately 7.5
       miles  to the east and into Big Indian Creek approximately 4 miles to the southeast.

 •      Topography at the Site has land surface elevations which vary from 516 feet above mean sea level
       (MSL) at the northern end of the Site to 510 feet  above MSL to the south.  The slope is generally
       around 1  percent. A man-made mound (cap) installed during an  interim clean-up by CGC,
       approximately 170 feet by 300 feet, with a maximum elevation of 520 feet above MSL, has been
       constructed at the north central portion of the Site. The cap consists of, from top to bottom, grass,
       24-inches of topsoil, a filtering geotextile, 12-inches of granular drainage material, a 30-mil High
       Density Polyethylene (HOPE) flexible membrane liner (FML), 24-inches of compacted clay, and
       geotextile fabric on the subbase to the compacted  clay.

5.2  HYDRO-GEOLOGY

•      The Site is underlain by several hundred feet of unconsolidated sediments consisting of interbedded
       layers of sand, silt, and clay. (See Figure 5-1 of the ROD for  OU #1). For simplification purposes,
       EPA has divided these into four main units which are called the Surficial Aquifer, the Upper
       Cretaceous  (UC) Water Table Aquifer, the UC Confined Aquifer, and the Tuscaloosa Aquifer. The
       RI, the FS approved for OU #1,  and the Record of Decision for OU #1 present a more in-depth
       discussion of the aquifers.

•      Under the EPA groundwater classification system, groundwater in the surficial aquifer and the
       Upper Cretaceous aquifers is considered Class lib groundwater (a potential drinking water source),
       while ground water in the Tuscaloosa aquifer is considered Class Ha groundwater (a current source
       of drinking  water).

•      The direction of the groundwater flow in the surficial aquifer is generally toward the southeast.
       Leakage occurs through the surficial perching unit from the  surficial aquifer into the Upper
       Cretaceous  sediments below.

•      The water table in the Upper Cretaceous aquifer indicates that ground water flows generally to the
       north  and northeast beneath most of the Site and to the east in the southeast portion of the Site.

•      The hydraulic head contours in  the Upper Cretaceous confined aquifer generally conform to those of
       the Upper Cretaceous water table  aquifer, indicating that groundwater flows primarily to the
       northeast and east.  There is also a component of the flow toward the  northwest in the Upper
       Cretaceous  confined aquifer, along the northwest  side of the  Site.  Hydraulic heads in the Upper
       Cretaceous  confined aquifer are typically below those of the water table', indicating vertical
       groundwater flow from the Upper Cretaceous water table aquifer into  the Upper Cretaceous
       confined aquifer.

-------
 •      Hydraulic head measurements in the Tuscaloosa aquifer beneath most of the Site indicate
       groundwater flow toward the southeast. These measurements also show a reversal in groundwater
       flow direction in and beyond the northwestern part of the facility. The direction of flow toward the
       northwest is consistent with the expected effects of pumping groundwater from the Tuscaloosa
       aquifer by the City of Fort Valley's wells.

 •      Plume delineation efforts for the properties proposed for redevelopment is currently underway in
       accordance with the OU #1 ROD and Remedial Design Work Plan. The flow directions are assumed
       to be similar to the flow directly beneath the former Woolfolk facility.  Should groundwater
       contamination be found beneath these properties, it will be addressed  as part of OU #1.

 •      Hydraulic and lithological data  indicate the potential for groundwater flow vertically downward
       beneath the former Woolfolk facility.  The.general nature of the perched surficial unit makes it
       likely for the groundwater to leak downward through this unit. Downward flow is also indicated by
       a comparison of the hydraulic-head gradients of the Upper Cretaceous Aquifers and the Tuscaloosa
       Aquifer.

5.3  MEDIA CONTAMINATION

In a baseline risk assessment addendum, supplemented by EPA revised risk calculations, discussed in
Section 6.0, EPA required evaluation of the risks associated with the contaminated soils on the OU #2
properties.  Using the pre-removal data from these properties, EPA established that the contaminants of
concern for the soils are:

Inorganics:  arsenic, lead;
Semi-volatile organics: benzo(a)anthracene, benzo(a) pyrene, benzo(b and/or k)fluoranthene; and,
Pesticides: Aldrin, BHC (alpha, beta, delta, gamma), Chlordane (alpha, gamma), DDE, DDT, Dieldrin,
Endosulfan (I and II), Heptachlor, Heptachlor epoxide, Methoxychlor, PCB-1254  and Toxaphene.

5.3.1   SOIL CONTAMINATION

•     At the Woolfolk Site, two series  of soils are identified:  The Greenville  series and the Grady Series.
      The Greenville Series soil commonly has a 4- to 8-inch  surface layer of dark reddish-brown or dark
      brown fine sandy loam and  a subsoil of dark red, friable sandy clay. The  Grady Series soil has a
       dark gray to black fine sandy loam  or sandy clay loam  surface layer (5 to  10 feet)  and a subsoil of
      firm gray clay that is sometimes mottled.

•     During  the RI, several  pesticides (toxaphene, DDD, DDE, DDT, dieldrin, BHCs), arsenic, and lead
       were detected in both surface (0 to  1 foot) and subsurface (generally 1  to 8 feet) soil samples
      collected from locations on and off the former Woolfolk  plant site. Areas with elevated
       concentration of one or more of these constituents include the tank farm, Area A cap,  Building W,
       Building S, west boundary of Marion Allen Insurance and Realty company property, and the area
       northeast of the limehouse (See  Figure 1-2 From the Remedial Investigation dated November,
       1992).

•      In general, the RI found that volatile and semivolatile  organic compounds were not detected as
       frequently as arsenic, lead,  or pesticides in either the surface or subsurface soil samples. In
       addition, the concentrations of volatile and semivolatile organic compounds were lower than the
       other constituents.

•      The remediation for soils will, for the most part, be addressed in OU #3.  Only those portions of the
       site which are part of the redevelopment project between Martin Luther King (MLK)  and Oak
       Streets are addressed as part of OU #2.

•      The delineation and removal of residential soil contamination is being completed pursuant to a
       UAO issued by EPA to CGC on  December 1,  1993.  Residential properties were sampled as part of
       the Removal Order.  Soils samples  were taken from 0 to 6 inches and  tested for inorganics,

-------
       extractable organics, and pesticides/PCB's.  These analyses were conducted to enable detection of
       chemicals present in on-facility surface soils which were above the IxlO'6 excess cancer risk level in
       the Baseline Risk Assessment.

 •      Based on the results of EPA's removal sampling activities, EPA's Emergency Response and Removal
       Branch defined an area of concern which would require disassociation of the residents from
       contaminated soil under the removal order.  The area had mixed residential, commercial and
       industrial land use.  For the properties between MLK and Oak Streets, the primary contaminant
       was found to be arsenic.

 •      CGC elected to comply with the Removal Order's requirement that residents be disassociated from
       contamination by purchasing and fencing'the OU #2 properties currently proposed for
       redevelopment because  arsenic contamination was found above the removal performance standard.
       CGC also removed the majority of the structures on these properties along with portions of the soils
       with arsenic contamination above 100 ppm (the preliminarily calculated health-based standard for
       non-residential properties). After the removal activities, the maximum concentration of arsenic
       remaining was found to be 74 mg/kg with an average concentration for all the properties of 40
       mg/kg.

 •      A summary of the contaminants of concern for the surface soils (approx. 0-6 inches) of the OU #2
       properties is presented in Table 6-1.

5.3.2   GROUNDWATER CONTAMINATION

 •      Groundwater contamination is outlined in the ROD for OU #1.  The groundwater contamination
       levels for each of the aquifers at this Site are presented in Table 6-1 of the ROD for OU #1. The
       performance standards (levels required to attain groundwater remediation) are established in Table
       6-9 of the OU #1  ROD.  A comparison of these two tables gives a view of the contamination at the
       site. Groundwater activities under OU #1 are currently in the Remedial Design stage.

 •      The levels of contamination exceed the performance standards established in the OU #1 ROD in the
       surficial, Upper Cretaceous (UC) water table, and UC confined aquifers. Trace contaminants have
       been detected directly beneath the site in the Tuscaloosa aquifer although recent sampling has
       indicated no detection of chemicals.  The City of Fort Valley water wells, which draw water from
       the Tuscaloosa aquifer, have never shown any measurable levels of contamination.

 •      Potential groundwater contamination beneath the redevelopment properties is currently being
       delineated as part of OU #1, Remedial Design. If contamination is found beneath these properties
       it will be addressed as part of OU #1. All actions with respect to redevelopment of these properties
       must be consistent with the activities under  all OUs at the site, including the design of a potential
       extraction system should groundwater contamination be  discovered beneath these properties.

5.3.3   SURFACE WATER AND SEDIMENT CONTAMINATION

 •      The RI  sampling results indicated that surface/storm water flowing off-site contained only trace
       levels of DDT, benzoic acid, and pentachlorophenol.  No sediment sampling was conducted  on the
       redevelopment properties due to the limited  area of the OU #2 properties and the grass cover which
       currently exists on these properties limiting  storm water  discharge from the properties.

 •      The  RI  results of sediment sampling from the former Woolfolk facility indicated that pesticide
       concentrations, with the exception of toxaphene, are generally higher on the facility than
       downstream (intersection of Preston and  Spruce streets).  Toxaphene concentrations were detected
       at levels up to 12 mg/kg downstream and were detected in three out of four samples throughout the
       stormwater conveyance system. The inorganic constituent results of the sediment samples
       indicated that arsenic levels were generally higher on the facility than upstream or downstream.
       No consistent pattern was observed with the lead  results.

-------
•     EPA is currently assessing the extent of the contamination downstream from the stormwater
      conveyance system discharge at Spruce Street.  To date, arsenic contamination has been found to
      extend one-half mile past this discharge.

•     The final remedial action for surface/storm water and sediment contamination from the facility will
      be addressed in a future ROD(s).

5.3.4  STRUCTURE CONTAMINATION

•     Building W and Building E at the former Woolfolk facility were constructed primarily of wood and
      sheet metal, with wood flooring.  Chemicals have been absorbed within the wood floors and have
      migrated through the floors to the underlying soils. Also, the wood rafters in Building W have
      pesticide dust on them as a result of using'this building to make pesticides in powder form.
      Building W is located on the Georgia Ag Chem  property to the west of the former Woolfolk plant.
      Organic pesticides were formulated and packaged in the building. Building E was located at the
      east end of the former Woolfolk plant.'  Elevated levels of arsenic, lead, pentachlorophenol, and
      dioxin were found in soil samples taken from the area beneath and adjacent to Building E during
      the Remedial Investigation.

•     From 1978 to 1979, several 30- and 55-gallon drums of silvex were brought into Building E and
      repackaged in pint and quart containers. Some of the silvex, which contained 2,3,7,8-
      tetrachlorodibenzo^p-dioxin (TCDD) as a contaminant, was disposed on the wood floors, resulting in
      localized contamination of the floors and underlying soil with silvex, TCDD, 2,4-
      dichlorophenoxyacetic acid and 2,4,5-trichlorophenoxyacetic acid.

•     Building E has been demolished by CGC under EPA's oversight pursuant to a Unilateral
      Administrative Order issued by EPA to CGC, Reichold, Limited,  and Canadyne Corporation.  Debris
      from this demolition remains on-site in a roll-off container, resting on a concrete slab, covered by a
      corrugated sheet metal roof, and surrounded by a 6-foot chain link fence.  The roll-off box is located
      inside the fence of the existing cap. The debris could not be disposed of because there is no disposal
      facility permitted to accept material with elevated levels of dioxin and arsenic contamination.

•     Building W and the debris from Building E will be addressed in OU #3.

5.3.5  AIR CONTAMINATION

•     A total of 24 chemicals were detected in on-site air samples taken during RI sampling consisting of
      6 volatile organics, 4 semi-volatile organics, 12  pesticides/herbicides, and 2 inorganics (lead and
      arsenic).

•     Air contamination will be addressed in OU #3.


6.0  SUMMARY OF SITE RISKS

CERCLA directs EPA to conduct a baseline risk assessment to determine whether an NPL Site poses a
current or potential future threat to human health and the environment in the absence of any remedial
action.  The baseline risk assessment provides the basis for determining whether or not remedial action is
necessary and the justification for performing remedial action.

The Remedial  Investigation (RI) and Baseline Risk Assessment (BRA) have determined the media
contaminated by the chemicals of concern.  In a previous ROD issued in March 1994, OU #1 addressed
contamination of the groundwater. OU #2 will address soil contamination on a portion of the properties
between MLK Drive and Oak Street which are proposed for redevelopment. OU#3 will address the
remaining contaminated media.

-------
 The Final BRA of the Site was submitted by CGC in November 1992.  Based on the results of the BRA
 and the RI, EPA conducted further sampling of residential properties under the Removal Program in 1993
 and 1994.  EPA determined that samples would need to be analyzed for a full scan of inorganic, semi-
 volatile, pesticide and PCB chemicals. EPA ordered CGC to disassociate residents from the soils exceeding
 action levels.  CGC purchased the affected OU #2 properties, demolished most of the former structures,
 removed soil with arsenic concentrations above 100 ppm, and fenced the properties.

 In June 1995, EPA asked CGC to develop an addendum to the BRA to determine the risks associated with
 current and proposed future non-residential use of the OU #2 properties.  The BRA Addendum
 summarized the analytical reports of the pre-removal soil samples for all of the non-residential properties.
 In developing the ROD, EPA decided that only those proposed non-residential properties which will be
 redeveloped into  the library project would be addressed in this ROD.  Using the exposure assumptions
 presented in the  BRA,  EPA revised the data summaries, the average daily intakes, the associated risks,
 and the soil action levels in order to be consistent with this ROD. Table 6-1 is a review of the pre-removal
 analytical results, as developed by EPA, for only those properties associated with the redevelopment
 project.

 The BRA Addendum identified the receptors and pathways for both current and proposed future scenarios.
 The current scenario receptors considered by EPA were on-site trespassers, off-site residents, and a
 maintenance worker required to maintain the fenced properties or provide work on the remaining
 structures.  The proposed future use of the property is for the two existing structures to be renovated into
 an office building and an adult education center, and for a library structure and parking lot to be
 constructed  on the vacant lots. The four receptors considered by EPA are the patrons of the proposed
 facilities, the maintenance worker, the construction worker, and the office workers/librarians.  The
 pathways for each of these receptors considered by EPA were inhalation, ingestion, and dermal contact.

 Actual or threatened releases of hazardous substances from this Operable Unit, if not addressed by
 implementing the response action selected in this ROD, may present an imminent and substantial
 endangerment to public health, welfare, or the environment.

 6.1   CHEMICALS OF  CONCERN

The  chemicals of concern (COCs) for OU2 were chosen based on three criteria: comparison with
background  levels, comparison with USEPA soil screening levels, and knowledge of past activities as a
pesticide formulator carried out by the former Woolfolk facility.  The baseline risk assessment addendum
included endrin ketone as a contaminant of concern (COO because it met one of the three criteria.
 However, health-based values do not exist to establish a health-based remediation level for endrin ketone.
The  concentration of endrin ketone on the OU #2 properties are not believed to pose an unacceptable
health risk.  This was determined by comparing health-based values for the parent compound, endrin, to
the maximum concentration of endrin ketone on the site.  Since the maximum concentration of endrin
ketone was three orders of magnitude lower than the health-based values for endrin, endrin ketone was
 eliminated as  a contaminant of concern for the OU #2 properties.

6.2   EXPOSURE ASSESSMENT

Whether a chemical is actually a concern to human health and the environment depends not only on the
 innate toxicity but also upon the likelihood of exposure, i.e. whether the exposure pathway is currently
complete or  could be complete in the future. A complete exposure pathway (a sequence of events leading
to contact with a chemical) is defined by the following four elements:

       •       A source and mechanism of release from the source,

       •       A transport medium (e.g. surface water,) and mechanisms of migration through the
              medium,

       •       The presence or potential presence of a receptor at the exposure point, and
                                                10

-------
Table 6-1: Contaminants of Concern for Surface Soils of Operable Unit #2
Chemical (All values mg/kg)
Arithmetic Mean
95% UCL
Maximum
Inorganics
Arsenic
Lead
49.74
242.37
65.7
336
180
570
Semivolatile Organics
Benzo(a)anthracene
*». •
Benzofajpyrene
Benzofb and/or k)fluoranthene
0.53
0.56
0.63
0.84
0.92
0.79
4.45
4.45
4.45
Pesticides
Aldrin
BHC-alpha
BHC-beta
BHC-delta
BHC-gamma
Chlordane-alpha
Chlordarte-gamrna
DDE
DDT
Dieldrin
Endosulfan I
Endosulfan II
Heptachlor
Heptachlor epoxide
Methoxychlor
PCB-1254
Toxaphene
0.004
0.003
0.028
0.012
0.005
0.19
0.22
0.93
1.03
0.29
0.013
0.008
0.005
0.12
0.03
0.079
0.5
0.006
0.005
0.046
0.019
0.006
1.82
0.85
2.77
4.43
1.72
0.007
0.018
0.007
0.31
0.05
0.14
0.92
0.022
0.012
0.33
0.13
0.043
1.15
1.6
5.6
4.5
1.5
0.16
0.03
0.02
1.0
0.12
0.46
3.4
       •      A route of exposure (ingestion, inhalation, dermal absorption).

If all four elements are present, the pathway is considered complete.

An evaluation was undertaken of all potential exposure pathways which could connect chemical sources at
the Site with potential receptors.  All possible pathways were first hypothesized and evaluated for
completeness using EPA's criteria. The current pathways represent exposure pathways which could exist
under current Site conditions.  The future pathways represent exposure pathways which could exist, in the
future, if the current exposure conditions change.  Exposure by each of these pathways was
mathematically modeled using generally conservative assumptions.

Under current site conditions, the following complete exposure pathways were identified:

       •      ingestion of contaminated soil by an on-site maintenance worker and on-site trespasser,
                                                11

-------
       •      dermal contact with contaminated soil by an on-site maintenance worker and on-site
              trespasser, and

       •      inhalation of contaminated soil by an on-site maintenance worker, on-site trespasser, and
              off-site resident.

The future exposure pathways are:

       •      ingestion of contaminated soil by a future maintenance worker, on-site patron, on-site
              construction worker and on-site office worker/librarian,

       •      dermal contact with contaminated soil by a future maintenance worker, on-site patron, on-
              site construction worker and on-site office worker/librarian, and

       •      inhalation of contaminated soil by a future maintenance worker, on-site patron, on-site
              construction worker and on-site office worker/librarian.

The potential for exposure to soils in the future exposure scenarios will be reduced for all receptors except
the construction worker, since much of the OU #2 soils will be covered by pavement or the library
building.

The exposure point concentrations for each of the chemicals of concern and the exposure assumptions for
each pathway were used to estimate the chronic daily intakes for the potentially complete pathways.  The ,
chronic daily intakes were then used in conjunction with cancer potency factors and noncarcinogenic
reference doses to evaluate risk.

The major assumptions for the OU #2 properties defining current exposure frequency and duration that
were considered in the exposure assessment were:

       •      The body weights are assumed to  beJ70 kilograms for a maintenance worker, 40 kilograms
              for a child trespasser, and 15 kilograms for a child resident not located on OU #2 properties.

       •      Ingestion rates are estimated as 100 mg/day for a maintenance worker and child trespasser.

       •      The exposure frequency is 50 days per year for a maintenance worker, 75 days per year for
              a child trespasser, and 350 days per year for a child resident not located on OU #2
              properties.

       •      The duration of exposure is assumed to be 25 years for a maintenance worker, 9 years for a
              child trespasser, and 6 years for a child resident not located on OU #2 properties.

The major assumptions for the OU #2 properties defining future exposure frequency and duration that
were considered in the exposure assessment were:

       •      The body weights are assumed to  be 70 kilograms for a maintenance worker, a construction
              worker, and an office worker and 40 kilograms for a child patron.

       •      Ingestion rates are estimated as 100 mg/day for a maintenance worker and child patron,
              480 mg/day for a construction worker, and 50 mg/day for an office worker.

       •      The exposure frequency is 50 days/year for a maintenance worker, 75 days/year for a child
              patron, 60 days/year for a construction worker, and 250 days/year for an office worker.

       •      The duration of exposure is assumed to be 25 years for a maintenance worker and office
              worker, 9 years for a child patron, and 1 year for a construction worker.
                                                 12

-------
Table 6-2
CRITICAL TOXICITY VALUES'
SLOPE FACTORS (SFs) AND REFERENCE DOSES (RfDs)
Contaminants

Arsenic
Lead
Benzo(a)anthracene
Benzo(a)pyrene
Benzo(b and/or k)
fluoranthene
Aldrin
BHC-alpha
BHC-beta
BHC-delta
BHC-gamma
Chlordane-alpha
Chlordane-gamma
DDE
DDT
Dieldrin
Endosulfan I
Endosulfan II
Heptachlor
Heptachlor epoxide
Methoxychlor
PCB-1254
Toxaphene
Notes:
Slope Factor
(SFs)
(mg/kg/day)"1
Oral
1.5
**-. •
0.73
7.3
0.73
17
6.3
1.8
6.3'
1.3
1.3
1.3
3.4E-01
3.4E-01
16
-
-
4.5
9.1
'
7.7
1.1
Inhal.
15
-
0.61
6.1
0.61
17
6.3
1.8
6.3'
-
1.3
1.3
-
3.4E-01
16
-
-
4.5
9.1
-
-
1.12*
Reference Dose
(RFD)
(mg/kg/day)
Oral
3.00E-4
-
-
-
-
3.00E-5
-
-
-
3.00E-4
6.00E-5
6.00E-5
-
5.00E-4
5.00E-5
6.00E-3
6.00E-3
5.00E-4
1.3E-5
5.00E-3
2.00E-5
-
Inhal.
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-•
-
-
-
-
-
-
-

1 Critical toxicity values obtained from Integrated Risk
Information System (IRIS) or Health Effects
Assessment Summary Tables (HEAST) (USEPA, Fiscal
Year 1991).
USEPA has not derived a RfD or slope factor
The slope factors are surrogate values based on the
BHC-alpha isomer.
13

-------
6.3  TOXICITY ASSESSMENT

Toxicity values are used in conjunction with the results of the exposure assessment to characterize site
risk.  EPA has developed critical toxicity values for carcinogens and noncarcinogens.  These critical toxicity'
values are listed in Table 6-2.  Cancer slope factors (CSFs) have been developed for estimating excess
lifetime cancer risks associated with exposure to potentially carcinogenic chemicals.  CSFs, which are
expressed in units of (mg/kg/day)"1, are multiplied by the estimated intake of a potential carcinogen, in
mg/kg/day, to provide a high end estimate of the excess lifetime cancer risk associated with  exposure at
that intake level.  The term "high  end" reflects the conservative estimate of the risks calculated from the
CSF. Cancer slope factors  are derived from the results of human epidemiological studies or chronic animal
bioassays to which animal-to-human extrapolation have been applied.
                                         **-.'•
Reference doses (RfDs) have been developed by EPA for indicating the potential for adverse health effects
from exposure to chemicals exhibiting noncarcinogenic effects.  RfDs, which are expressed in units of
mg/kg/day, are chemical-specific estimates of lifetime daily exposure levels for humans, including sensitive
individuals, which are not expected to cause harm. Estimated intakes of chemicals from environmental
media can be compared to the RfD. RfDs are derived from human epidemiological studies or animal
studies to which uncertainty factors have been applied (e.g., to account for the use of animal data to
predict effects on humans).  These uncertainty factors help ensure that the RfDs will not underestimate
the potential for adverse noncarcinogenic effects to occur.

6.4  RISK CHARACTERIZATION

Human health risks are characterized for potential carcinogenic and noncarcinogenic effects by .combining
exposure and toxicity information. Excessive lifetime cancer risks are  determined by multiplying the
estimated daily intake level with the cancer slope factor.  These risks are probabilities that  are generally
expressed in scientific notation (e.g., IxlO"6). An excess lifetime cancer risk of IxlO"6 indicates that, as a
plausible upper limit, an individual has a one in one  million additional (above their normal  risk) chance oj|
developing cancer as a result of site-related exposure to a carcinogen over a 70-year lifetime under the
assumed specific exposure conditions at a site.

EPA considers individual excess cancer risks in the range of IxlO4 to IxlO"6 as protective; however the
IxlO"6 risk level is generally used as the point of departure for setting cleanup levels at Superfund sites.
The point of departure risk level of IxlO"6 expresses EPA's preference for remedial actions that result in
risks at the more protective end of the risk range.

Potential concern for noncarcinogenic effects of a single contaminant in a single  medium  is expressed  as
the hazard quotient (HQ) (or the ratio of the estimated intake derived  from the contaminant concentration
in a given medium to the contaminants' reference dose). A HQ which exceeds one (1) indicates that the
daily intake from a scenario exceeds the chemical's reference dose.  By adding the HQs for all
contaminants within a medium or across all media and appropriate pathways to which a given population
may reasonably be exposed, the Hazard Index (HI) can be generated. The HI provides a useful reference
point for gauging the potential  significance of multiple contaminant exposures within a single medium or
across media.  An  HI which exceeds unity indicates that there may be  a concern for potential health
effects resulting from the cumulative exposure to multiple contaminants within a single medium or across
media for an individual receptor. Summaries of risk characterization are presented in Tables 6-3 and 6-4.

The risk characterization values are overestimated due to the subsequent removal actions taken on the
OU#2 properties.  The BRA addendum and revised risk calculations used contaminant concentrations
based on the pre-removal soil data. Certain properties have had soils  removed and disposed of in an off-
site landfill.  These removal actions were not taken into consideration  by EPA while deriving the risk
characterization values shown in the table.

Throughout the risk assessment process, uncertainties associated with evaluation of chemical toxicity an
potential exposures arise.  For example uncertainties arise in derivation of toxicity values for reference
doses (RfDs) and carcinogenic slope factors (CSFs), estimation of exposure point concentrations, fate and
transport modeling,  exposure assumptions and ecological toxicity data. Risk assessment uncertainties may


                                                 14

-------
lead to an under- or over-estimation of the actual risk by the risk calculations presented in this section.
However, because of the overall conservative  nature of the risk assessment process, risk estimated in this
assessment are likely to overestimate the true risk associated with potential exposure at OU #2 of the
Woolfolk Chemical Site. Major uncertainties for the OU #2 at the Woolfolk Chemical Site are enumerated
in Table 6-5.
TABLE 6-3
Risk Characterization Summary for Current Use Scenarios
Receptors
Maintenance Worker
Child Trespasser
Off-site Child Resident
Hazard Index
0?09
0.21
ND'
Additional Lifetime
Cancer Risk
1.4 E-05
1.2 E-05
5.2 E-09
.'ND= not determined: Hazard Index could not be calculated for the off-site child resident
scenario due to lack of an arsenic reference dose for the inhalation pathway.
TABLE 6-4
Risk Characterization Summary for Future Use Scenarios
Receptors
Maintenance Worker
Child Patron
Construction Worker
Office Worker/Librarian
Hazard Index
0.06
0.14
0.46
0.14
Additional Lifetime
Cancer Risk
9.9 E-06
7.5 E-06
3.1 E-06
2.1 E-05
                                          TABLE 6-5
                        SUMMARY OF UNCERTAINTIES ASSOCIATED
                                  WITH RISK ASSESSMENT
                     Assumption
       Environmental Sampling and Analysis

       Errors in chemical analysis


       The majority of soil samples were taken in
       the region of the suspected contamination
       Toxicological Data

       Hazard indices (His) were developed
       assuming all toxic effects were additive
       Exposure Parameters

       Conservative values were used for exposure
       duration, frequency, and intake levels.
  Estimated
Magnitude of
Effect on Risk
     Low


 Low-Moderate
 Low-Moderate
 Low-Moderate
 Direction of Effect
  on Risk Estimate
Over or underestimate
risk

Overestimate risk
Overestimate risk
Overestimate risk
                                              15

-------
 6.5   ECOLOGICAL RISK/HISTORICAL SITES

 An ecological risk assessment evaluates potential hazardous effects on non-human species at Superfund
 sites.  It may be a qualitative or quantitative appraisal of the actual and potential effects on the
 environment of a Superfund site.  Not all sites provide a suitable ecological habitat.  Many sites in
 industrial areas have little or no wildlife. The appropriate level of effort for assessing ecological risk is
 determined on a site-by-site basis.

 The Woolfolk facility is located adjacent to the  central business district of Fort Valley, Georgia,  and the
 surrounding community consists of residential  homes and small businesses.  A qualitative assessment of
 the potential ecological effects of the Woolfolk Chemical Works facility determined that the site  poses no
 significant ecological impacts. The properties being considered under this operable unit are unlikely to
 pose ecological concerns due to their location, ft is unlikely that the Woolfolk facility and the OU #2
 properties affect any designated wetlands due to the fact that the closest wetland is more than three miles
 from  the Facility and is not hydraulically connected. The Woolfolk facility is not located within  either the
 100-year or 500-year floodplain.  However, a drainage corridor heading south of the facility is currently
 under evaluation and will be addressed under OU #3.

 It is unlikely that OU #2 affects either of the three identified endangered species (i.e., the Red-Cockaded
 Woodpecker, Kirtland's Warbler, or the Bald Eagle) that reside in the geographical area for the  following
 reasons: 1) There are no records or reported sightings of any of these species in Peach County, and 2) the
 Facility and  surrounding area do not provide the critical types of habitat needed for these endangered or
 threatened species.

There are two historical sites listed in Peach County, Georgia. These sites include the Peach County
 Courthouse located on West Church Street, and Strother's Farm located near the Peach/ Macon  County
line.  It is unlikely that the Facility adversely affects the use of these historical sites nor their cultural
value because they are located at least 1/2 mile from the Facility.

There are no wild  and scenic rivers nor designated wilderness areas in Peach County. The Facility does
not affect any coastal zones or coastal barriers.

6.6  PERFORMANCE STANDARDS

The establishment of health-based performance standards serves as an important means of guiding
remedial activities. A health-based approach is warranted when performance standards promulgated by
state  or federal agencies are not available for contaminants in soil, as well as for certain groundwater
contaminants.  The approach to developing health-based standards is derived from the risk assessment
process.  The risk assessment is essentially a process by which the magnitude of potential cancer risks and
other health  effects at a site can be evaluated quantitatively.  A performance standard is established by
back-calculating a health protective contaminant concentration, given a target cancer risk or hazard
quotient which is deemed acceptable and realistic.  The  concept of the performance standard inherently
incorporates the concept of exposure reduction which allows remedial alternatives to be flexible.

The soils on the OU #2  properties at the Woolfolk Chemical site currently contain concentrations of
Site-related contaminants at levels which would pose an unacceptable risk to human health if the
properties are used for residential use.  Actual  or threatened releases of hazardous substances from this
OU, if not addressed by implementing the response  action selected in this ROD, may present an imminent
and substantial endangerment to public health, welfare, or the environment.

The performance standards for this OU are contained in Table 6-6. The standards assume non-residential
use. The performance standards are established at the  lower of: (1) the IxlO'5 risk level, (2)  the hazard
quotient of 1, or (3) the groundwater protection standard.  The IxlO5 risk level is protective  and will only
be achieved in light of the planned future use of the OU#2 properties, the institutional controls  that are
planned for this operable unit, and all of the RODs for the Woolfolk Site. Setting the performance
standards for each soil contaminant at the  IxlO5 risk level or a HQ of 1.0 is considered protective because
                                                 16

-------
the future receptor with the greatest calculated cumulative risk (the future institutional worker) is 2xl05.
This cumulative risk level is within EPA's protective risk range of IxlO4 to IxlO"6.
TABLE 6-6: SOIL PERFORMANCE (CLEANUP) STANDARDS
(ALL UNITS IN MG/KG OR PPM)
Contaminants
Standard
Contaminant
Standard
Metals
arsenic
113(G)
lead
625fG)
Pesticides ""'
aldrin
BHC-alpha, -delta
BHC-beta
BrIC-gamma (lindane)
Chlordane-alpha
Chlordane-gamma
DDE
DDT
2.23(R)
6.02(R)
0.5(G)
0.066(G)
• 29.2CR)
29.2(R)
9.8(G)
8. KG)
Di'eldrin
Endosulfan I
Endosulfan II
Heptachlor
Heptachlor epoxide
Methoxychlor
PCB 1254
Toxaphene
2.37(R)
3,070(R)
3,07(XR)
8.42(R) .
4.16fR)
2,560(R)
4.92(R)
34.5(R)
Semivolatile Organic Compounds
Benzo(a)anthracene
Benzo(b/k)fluoranthene
51.9(R)
51.9(R)
Benzo(a)pyrene
5.19(R)

Footnote:
(G) Based on EPA's Site-Specific Protection of Groundwater Action Levels
(R) Based on Site-Specific Risk Assessment
The performance standards for the protection of groundwater are based on EPA vadose zone modeling.
For certain OU #2 Chemicals of Concern (COG) which did not have a standard set under OU #1, a health-
based performance standard for groundwater protection was calculated by setting the risk level in the
groundwater at IxlO'6, consistent with OU #1, groundwater. A model was used to establish the time
required to reach peak leachate concentration and the equivalent soil performance standard.  A range of
values was established by varying the degradation rate and the depth of concentration of the maximum
soil concentration found on the properties.

USEPA considers arsenic to be both a carcinogen and a systemic toxicant.  Arsenic exposure via drinking
water has been linked to increased incidences of skin cancer.  The possible carcinogenic effects to human
health from ingestion of arsenic laden soil are not being considered here as the health endpoint for the
performance standards.  Rather, a  noncancer endpoint, or a soil concentration of arsenic  that is protective
of groundwater, is felt to be a more appropriate basis for deriving values protective of human health.  The
groundwater protective basis for the arsenic performance standard is within EPA's acceptable risk range
for the carcinogenic endpoint and the non-cancer HQ of 1.0.
                                                 17

-------
7.0  DESCRIPTION OF ALTERNATIVES

The following is a description of remedial alternatives evaluated to provide a range of cleanup options for
Operable Unit #2 at the Woolfolk Site. The alternatives for the remediation of contaminated soil in OU #2
at the Woolfolk Chemical Works Site were evaluated in the Feasibility Study Addendum (FSA) and
presented in  the Proposed Plan for the Site.  During the comment period, EPA re-evaluated the Proposed
Plan alternatives based on revised risk calculations, which were presented in the previous chapter, but did
not require a revision of the FSA. The revised alternatives included only those properties which are being
proposed for a redevelopment project,  however, the basic concepts presented in the FSA remained valid.
Based on public comment received during the public comment period, EPA revised the performance
standards a second  time. EPA documented the first changes to the performance standards and the
preferred alternative in the Proposed Plan in a memorandum dated August 25, 1995, filed in the
Administrative Record.  The second revisions are presented in this ROD and documented in a second
memorandum from  Elmer Akin to Tim Woolheater dated September 28,  1995.  The alternatives presented
in the Table 7-1 represent the revised alternatives considered by EPA in developing this Record of
Decision.  The changes to these alternatives are discussed in Chapter 11.0 of this ROD.
Table 7-1: Operable Unit #2 Alternatives
Alternative
Number
1
2
3
4
5
Medium
Soil
Soil
Soil
Soil
Soil
Remedial Action
No Action
Place institutional controls on the proposed
redevelopment properties to ensure non-residential
land-use including no groundwater use and monitor
progress on the redevelopment project to ensure
engineering controls are implemented and remain
protective of human health and the environment.
Excavation of soils on residential properties with
disposal on the Woolfolk facility.
Excavation of soils on residential properties with
disposal at a permitted facility off-site.
Excavation of soils exceeding the IxlO'5 risk level with
disposal at a permitted facility off-site. Place
institutional controls on the proposed redevelopment
properties to ensure non-residential land-use
including no groundwater use and monitor progress
on the redevelopment project to ensure
implementation and protectiveness.
Capital
Cost
(thousands)
$0
$ 15
$ 160
$300
$55
The assembled site-specific alternatives represent a range of distinct waste-management strategies
addressing the human health and.environmental concerns posed by Operable Unit #2. Although the
selected remedial alternative may be further refined during the predesign and design phases, the analysis
presented below reflects the fundamental components of the various alternatives considered feasible for
this Site.
                                                 18

-------
 7.1  ALTERNATIVE 1: NO ACTION

 The no action alternative is carried through the screening process as required by the National Oil and
 Hazardous Substances Pollution Contingency Plan (NCP). This alternative is used as a baseline for
 comparison  with other alternatives that are developed. Under this alternative, EPA would take no further
 action to minimize the soil contamination threat posed by the properties between Martin Luther King
 Drive and Oak Streets.  No institutional controls or remedial actions are implemented under the no-action
 alternative.  Under this alternative, there are no impediments to the future residential use of these
 properties.  There is no cost associated with this alternative since no additional activities would be
 conducted.

 7.2  ALTERNATIVE 2: INSTITUTIONAL/ENGINEERING CONTROLS
                                            •**,'•
 Institutional controls under this alternative include placing restrictive covenants on the properties to
 preclude residential use, groundwater use, or other uses with  similar exposure potential. Although these
 institutional controls help reduce risks associated with contact with contaminated soils,  they do not reduce
•the contamination.  Covenants would be recorded with the Peach County Clerk of Superior Court. Such
 restrictions  would be imposed on the land and be binding on the owner's successors and assignees. Copies
 would be provided to the zoning or land use planning authority with jurisdiction over the property.

 Engineering controls will require either paving, buildings, or landscaping (minimum of 6 inches of top soil)
 on approximately 85% of the proposed library project property. The assumptions used to evaluate the
 future risks  in this ROD were based on the assumptions that engineering controls  will be place.
 Implementation of the construction activities for the library project will be required to achieve
 protectiveness under this ROD.  Further review of protectiveness will be conducted through EPA's periodic
 reviews of OU #2.

 7.3  ALTERNATIVE 3: EXCAVATION WITH ON-SITE DISPOSAL (AS PART OF OPERABLE UNIT 3)

Alternative 3 includes soil excavation on two (202 & 204) Oak Street properties that are zoned for
 residential use and do not meet interim residential levels contained in  the Removal Action Unilateral
Administrative Order (UAO).  Soil excavated from these two properties would be disposed of in a landfill
proposed for the Woolfolk property in OU #3. Soil  excavation  to action levels established by the Removal
Action UAO  on these two properties would involve excavation of about 360 cubic yards of soils.  One
property (216 Oak St.) has been remediated to residential levels in the Removal Action Unilateral Order.
The other OU #2 properties are zoned for non-residential use and, therefore, would not be excavated under
this scenario.

 Operable Unit 3 will establish final remedial action levels for residential land use and determine any
further  excavation that may be necessary to meet with these remedial  standards.  If standards are
 established under the OU #3 ROD which are consistent with Removal Action UAO, no further excavation
 would be required on the 216 Oak St. property.

 7.4  ALTERNATIVE 4: EXCAVATION WITH OFF-SITE DISPOSAL

 This alternative is similar to Alternative 3, except off-site disposal is used as was utilized for excavated
 soils under the Removal Action UAO.

 7.5  ALTERNATIVE 5: INSTITUTIONAL CONTROLS/EXCAVATION WITH OFF-SITE DISPOSAL

 This alternative would implement institutional controls similar to Alternative #2 to ensure that future
 land use of the properties would be non-residential. Permanent restrictive covenants would be placed on
 properties to preclude residential use or other uses with similar potential exposure. The covenants would
 be recorded  with the Peach County Clerk of Superior Court.  Such restrictions would be imposed on the
 land and be  binding on the owner's successors and assignees.  Copies would be provided  to the zoning or
 land use planning authority with jurisdiction over the property.
                                                19

-------
 In the August 25,  1995 memorandum updating the Proposed Plan, one property, 204 Oak St., currently
 zoned for residential use was not believed to meet a 1x105 risk level for dieldrin.  Soil excavation to non
 residential action levels at, or below, IxlO5 risk level was believed to involve excavation of 100 cubic y
 of material and the disposal would be in an off-site landfill determined in OU #3.

 Based on the revised risk assessment calculations, EPA determined that the soils on 204 Oak Street did
 not exceed the 1x105 risk level for dieldrin. This alternative, therefore, was not selected.

 8.0  SUMMARY OF THE COMPARATIVE ANALYSIS OF ALTERNATIVES

 This section of the ROD provides the basis for determining which alternative provides the best balance of
 the criteria in Section 121 of CERCLA and in Section 300.430 of the NCP. The major objective of the FS
 Addendum was to  develop, screen, and evaluate alternatives for remediation of OU #2.

 EPA evaluated each alternative by the standard criteria shown in Table 8-1 to determine which provided
 the best overall balance.  To be considered as a remedy, the alternative must be protective of human
 health and the environment, and comply with applicable or relevant and appropriate requirements
 (ARARs). ARARs for the Site are discussed in Section 8.2 and Appendix B.

 The selected alternative must meet the threshold criteria of overall protection of human health and the
 environment and compliance with all ARARs (or be granted a waiver for compliance with ARARs).  Any
 alternative that does not satisfy both of these requirements is not eligible for selection. The  Primary
 Balancing Criteria are  the technical criteria upon which the  detailed analysis is primarily based. The
 final two criteria, known  as Modifying Criteria, assess the public's and the state agency's acceptance of the
 alternative.  Based on these final two criteria, EPA may modify aspects of a specific alternative.
                             Table 8-1: Breakdown of Evaluation Criteria
    THRESHOLD CRITERIA
   PRIMARY BALANCING
         CRITERIA
   MODIFYING CRITERIA
  -Overall protection of human
  health and the environment
-Long-term effectiveness
-State acceptance
  -Compliance with ARARs (or
  invoking a waiver)
-Reduction of toxicity, mobility,
or volume through treatment
-Community acceptance
                                  -Short-term effectiveness
                                  -Implementability
                                  -Cost
The following analysis is a summary of the evaluation of the OU #2 alternatives for remediating the soils
remaining on the properties under each of the criteria. A comparison is made between each of the
alternatives for achievement of a specific criterion.

Threshold Criteria

8.1  OVERALL PROTECTION OF HUMAN HEALTH AND THE ENVIRONMENT

The assessment of this criterion describes how each alternative, as a whole, achieves and maintains   I
protection of human health and the environment. This criterion provides the final check to determine
which of the alternatives best provides for adequate protection of human health  and the environment.
                                                20

-------
This criterion draws on the assessments conducted under other criteria, especially long-term effectiveness
and permanence, short-term effectiveness, and compliance with ARARs.

Present contamination levels are not protective for residential use or any use similar to residential use.
Alternatives #1, #3 and #4 provide no protection from the future use of the OU #2 properties for
residential purposes.  Though the majority of the properties are zoned for commercial use the potential
exists for conversion of the property to residential use.  Alternatives #2 and #5 provide for restrictive
covenants against the use of the properties for residential purposes and provide the best overall protection
of human health and the environment. Based on comments received during the public comment period,
Alternative #5 was  deemed unnecessary due to all contaminants having risks below 1x105.  Therefore,
Alternative #2 provides the best overall protection.

Alternative #1 is also not protective because of trte lack of engineering controls. Alternative #2, #3, #4,
and #5 rely on the construction of a protective cover (i.e building, paving, or topsoil) to limit exposure to
potential future receptors. Alternatives #3, #4, and #5 further reduce the potential for future exposure by
excavation  of contaminated soils, although each presents higher short-term risks due to the construction
activities.  Alternatives #4 and #5 are less preferred due to off-site disposal. Alternatives #3 and #4
actions would need  to be consistent with the ROD for OU #3 which will set residential performance
standards.  Both Alternatives #3 and #4 are not protective in the long-term  due to the potential for
residential  land use.

8.2  COMPLIANCE WITH ARARs

The evaluation  of the ability of the alternatives to comply with ARARs includes a review of chemical-
specific, action-specific, and location-specific ARARs. Applicable requirements are those cleanup
standards,  standards of control, and other substantive environmental protection requirements, criteria, or
limitations promulgated under federal or state law that specifically address  a hazardous substance,
pollutant or contaminant, location, or other circumstances at a CERCLA site.  Relevant and appropriate
requirements are those cleanup standards, standards of control, and other substantive environmental
protection requirements, criteria, or limitations promulgated under federal or state law that are not
directly  applicable to a hazardous substance, pollutant or contaminant, location, or other circumstances at
a CERCLA site but address problems or situations sufficiently similar to those encountered at the
CERCLA site, and whose use is well  suited to the particular site. The judgement of the relevance and
appropriateness of a requirement to a remedial action depends on the substances in question, the physical
nature of the site, or other circumstances at the site.

In order to comply with CERCLA requirements, selected  remedial actions must attain ARARs unless a waiver
is invoked. Performance standards for a remedial action will generally be  based on  chemical-specific and
location-specific ARARs or health-based levels.

In the event that an ARAR does not exist, other pertinent guidelines  and standards  should be considered.
These are commonly referred to as To-Be-Considered (TBC).  Risk-specific doses (RSDs), reference  doses
(RFDs), health advisories (HAs) and state and federal guidelines  and criteria,  etc. are example of TBCs.

All of the alternatives will meet ARARs, except for Alternative #3 which would require a waiver for the  siting
requirements for an on-site landfill.  Alternatives #1, #3 and #4 do not meet some of the "to-be-considered"
guidelines due to the lack of institutional controls required to prevent the potential for the property to be used
in the future for residential purposes. The performance standards established forth in this ROD are  based
on the use  of the property for non-residential purposes.  The standards would  change if residential use was
assumed because there would be a need to protect the child on the residential  property.  Alternative #2 and
#5  will  meet all identified ARARs and "to-be-considered" guidelines, since  residential use  is precluded by
restrictive covenants.  All identified ARARs and "to-be-considered" guidelines for Alternative #2 are presented
in Appendix B.
                                                 21

-------
 Primary Balancing Criteria

 8.3  LONG-TERM EFFECTIVENESS AND PERMANENCE

 This criterion evaluates the long-term effectiveness of the alternatives in maintaining protection of human
 health and the environment after the remedial objectives have been met.  The evaluation compares the risk
 remaining for each of the alternatives after meeting the objectives. The primary focus of this evaluation is
 the extent and effectiveness of the controls that may be required to manage the risk posed by untreated
 wastes.  It ensures that the magnitude of the residual  risk and adequacy/reliability of the controls of the
 remedial action are addressed.

 Alternatives  #2 and #5 have permanent restrictive covenants to prevent the use of the OU #2 properties for
 residential use and, therefore, are the most protective of the alternatives in the long-term.  Alternatives #1,
 #3, and #4 are less protective due to the potential for future conversion of the properties for residential use,
 though, three properties are excavated to residential levels. Alternative #5 is more permanent, and slightly
 more protective, than Alternative #2 because excavation of contaminated dieldrin soils on one property are
 removed rather than being paved to prevent future exposure.

 8.4  REDUCTION OF TOXICITY. MOBILITY. OR VOLUME THROUGH TREATMENT

This criterion compares the alternatives' specific treatment technologies' anticipated performance. It addresses
the statutory preference for selecting remedial actions that employ treatment technologies that permanently
and significantly reduce toxicity, mobility, or volume of the hazardous substances as their principal element.

Due to the low levels of contamination and small volume of contaminated soils on the OU #2 properties it is
not practical  to require treatment to reduce the toxicity, mobility, or volume. None of the alternatives involve
treatment, therefore, this criterion does not distinguish among the five alternatives.

8.5  SHORT-TERM EFFECTIVENESS

The  assessment of this  criterion examines the  comparative effectiveness of each  of the alternatives in
protecting human health and the environment during the construction and implementation of a remedy until
the response  objectives have been met. Factors to consider are: protection of the community, protection of the
workers, environmental impacts, and  the time until the remedial objectives are met.

Alternatives  #1 and #2 are more effective in the  short-term because the actions will not require  further
disruption  of the  community nor create  additional   risk due to remediation  construction  activities.
Environmental impacts are less likely for these alternatives and the time is relatively short. This is not the
case for alternatives #3, #4, and #5, as excavation activities will disrupt the community and create additional
risks due to construction traffic and contamination transport. Alternative #3 would require the longest time
to implement due to the need to dispose of the site material on-site.

8.6  IMPLEMENTABILITY

This criterion evaluates the technical and administrative feasibility of the alternatives and the availability
 of the  required goods and  services.  The following factors are considered:  Construction and operation,
 reliability of the  technology,  ease of undertaking additional  remedial  action,  monitoring conditions,
 coordination  with  other  offices and  agencies, availability of  disposal services, availability of services,
 equipment, and materials.

Alternative #1 would require no action to implement.   Technological expertise, services, equipment and
 materials are adequately available for the implementation of Alternative #2 through #5. Alternative #3 must
 be implemented as part of Operable  Unit #3 since it requires an on-site landfill. Alternatives #3 and #4 wotfk
 need to be consistent with the residential performance standards and require disposal services. All or


                                                 22

-------
 alternatives would require periodic review by EPA.  Institutional controls would be placed for Alternatives #2
 and #5 prior to transferring the property to the future owner. The Prospective Purchaser Agreement with the
 future owner will allow EPA the ability to enforce these institutional controls.

 8.7  COST

 This criterion  evaluates the capital, operation, and maintenance costs of the alternatives.  Capital costs are
 direct (construction) and indirect (non-construction and overhead) costs. Operation and Maintenance costs
 are post-construction costs necessary to ensure the continued effectiveness of the remedial action.

 There are no anticipated costs for the operation and maintenance of any of the alternatives. The capital costs
 for each of the alternatives is: Alternative 1, $0; Alternative #2, $15,000;  Alternative #3, $75,000; Alternative
 4, $141,000, and Alternative #5, $55,000.

 Modifying Criteria

 8.8  STATE ACCEPTANCE

This section provides the support agency's preference for the alternatives  presented.  The State of Georgia,
as represented by the Georgia Environmental Protection Division (GaEPD), has been the support  agency
during the Remedial Investigation and Feasibility Study process for the Woolfolk Chemical Works site.  In
accordance with 40 CFR 300.430, as the support agency, GaEPD has provided input during this process. The
State of Georgia deferred to EPA on the efficacy of the selected remedy in a letter dated September 29, 1995.
The letter of deferral is in Appendix C.

8.9  COMMUNITY ACCEPTANCE

EPA has considered comments received during the public comment process associated with the Proposed Plan.
EPA has included a Responsiveness Summary in Appendix A of this ROD, which addresses those comments.
Comments received were both in support and in opposition to the preferred  alternative, which is chosen as
the selected remedy.

The entire Woolfolk Site has generated great interest and concern in this  community. There is support for
the redevelopment of these properties but not at the expense of human health  and the environment. EPA has
made attempts to explain that the remedy is protective but certain members  of the community are skeptical
of EPA's explanation.  Community concerns address site risks, rather than  any of the specific alternatives
considered. EPA has documented the concerns raised during the comment period and addressed them in the
Responsiveness Summary of Appendix A.


9.0  SUMMARY OF SELECTED REMEDY

Based upon consideration of the requirements of CERCLA, the NCP, public and state comments, EPA has
selected Alternative #2 as a remedy for OU #2 at the Site. Due to the past removal  actions at the site,  limited
further  action will be required on the  thirteen  (13) properties proposed for a  redevelopment  project as
discussed  in this Record of Decision (ROD). In order to implement this remedy, EPA will require:

   • land use consistent with the proposed redevelopment plan for the new Peach County Library Building;

   • land use consistent with "the renovation of two existing structures located at 201 Oakland Heights and
   202 Oak Street for the purpose of an office building and an adult education center, respectively; and,

   • placement of institutional controls to ensure  that future land use is non-residential and  groundwater
   beneath the site cannot be used for any  purpose as stipulated in this Record of Decision.


                                                23

-------
 EPA has entered into a Prospective Purchaser Agreement with the Peach County Libraries Board, the Fort
 Valley Redevelopment Authority, and the Peach County Chamber of Commerce. The ROD is based on the
 assumption that proposed properties will be transferred to these entities and redeveloped for use as a library,
 an office building, and an adult-education center.  If this project does not proceed, it will be necessary  to
 review this record of decision.  Progress of the redevelopment project and whether or not the remedy remains
 protective  will be periodically  reviewed by EPA.

 The area of concern at this Site for OU #2 is defined as the properties between MLK Drive, Oak Street,
 Oakland Heights Parkway, and Peachtree Street which are proposed for a redevelopment project. The street
 addresses include 307-323 MLK Drive, 201 Oakland Heights Parkway (also known as the Troutman House),
 and 202, 204, and 216 Oak Street. For an OU #2 site map,  see Figure 1.2.

 At the completion of this remedy, the risk associated with this Site has been calculated  to be at, or below,
 EPA's excess cancer risk range of IxlO6 to IxlO4 and below a Hazard Index of 1, which is determined to be
 protective of human health and the environment. The total  present cost of the selected remedy, Alternative
 #2, is estimated at $15,000 for capital costs. There are no operation and maintenance costs associated with
 the remedy.  The timeframe for implementation of the engineering controls is approximately three years.

 A.   SOURCE CONTROL

 Source control remediation will address the contaminated soils on the  OU#2 properties.  EPA evaluated the
 properties based on the current and potential future use of the OU#2 properties.  The use  of these properties
 must be  consistent with the plans that EPA has reviewed in determining the risk associated with this use.

A.I  Land use consistent with the redevelopment plan on MLK/Oak Street

The proposed library will be centered  on 311 MLK  to 319 MLK. The  remaining properties will be used for
parking and driveways to the library and the adult-education center.  In evaluating the risk for future users
of the library, EPA estimated that 85% of the property will be covered by either the library building, paving,
or landscaping with a minimum of six (6) inches of  topsoil.  EPA will periodically review the redevelopment
project to ensure that the project is continuing on a timely schedule.

A.2  Land use consistent with the proposed office structure  on Oakland  Heights:

A similar redevelopment initiative is planned for the properties on 201  Oakland Heights and 202 Oak Street.
The 201  Oakland Heights property is planned for use as an office building for the Peach County Chamber  of
Commerce  and the Fort Valley Redevelopment Authority. The 202 Oak Street property is planned to be used
for an Adult Education Center operated by the Peach County Library Board.  The existing building on 201
Oakland heights is planned to  be renovated and only limited paving will be added, although six (6) inches  of
topsoil is planned for the front yard and west-back yard. The existing building on 202 Oak Street is also
planned  for renovation and paving will be placed in the rear of the property.

A.3  Placement of Institutional Controls:

The risk  evaluation  was based  on the assumptions that the property will be used for non-residential purposes
and that no groundwater  from beneath the properties is used.  Residential use of these properties is not
protective of human health. Permanent restrictive covenants must be placed on each of the properties  to
prevent current and future owners from using the properties, and the groundwater beneath these properties,
in a manner inconsistent with this ROD, or other EPA RODs.  The covenants shall be recorded with the Peach
County  Superior Court and transfer  with  the land to be binding on current and successive owners and
assignees.  Copies of the covenants will be provided  to the authorities with jurisdiction. The covenants must
be in effect before the transfer of the property may  take place.
                                                24

-------
At a minimum, restrictive covenants must comply with terms set out in Exhibit B of the Prospective Purchaser
Agreement (PPA) between EPA and three local entities.  EPA will enforce these restrictions through the PPA.
Periodic review of protectiveness as it relates to this remedy will be conducted by EPA no less than every five
years.

B.  Performance Standards

Soils shall meet the performance standards set forth in Table 9-1.

C.  Other Standards

In addition, the selected remedy shall  comply with those ARARs identified in Section 10.2 (Attainment of
ARARsJ and in Appendix B of this ROD.

D.  Compliance Monitoring

The redevelopment project will be reviewed by EPA on a periodic basis, at least once every five years.
TABLE 9-1: SOIL PERFORMANCE (CLEANUP) STANDARDS
(ALL UNITS IN MG/KG OR PPM)
Contaminants
Standard
Contaminant
Standard
Metals
arsenic
113(G)
lead
625(G)
Pesticides
aldrin
BHC-alpha, -delta
BHC-beta
BHC-gamma (lindane)
Chlordane-alpha
Chlordane-gamma
DDE
DDT
2.23(R)
6.02(Rj
0.5(G)
0.066(G)
29.2(R)
29.2(R)
9.8(G)
8. KG)
Dieldrin
Endosulfan I
Endosulfan II
Heptachlor
Heptachlor epoxide
Methoxychlor
PCB 1254
Toxaphene
2.37(R)
3,070(R)
3,070(R)
8.42(R)
4.16(R)
2,560(R)
4.92(R)
3-4. 5(R)
Semivolatile Organic Compounds
Benzo(a)anthracene
Benzo(b/k)fluoranthene
51.9(R)
51.9CR)
Benzo(a)pyrene
5.19(R)

Footnote:
(G) Based on EPA's Site-Specific Protection of Groundwater Action Levels
(R) Based on Site-Specific Risk Assessment
                                                25

-------
 10.0  STATUTORY DETERMINATION

 Under its legal authority, EPA's primary responsibility at Superfund Sites is to undertake remedial actions
 that achieve adequate protection of human health and the environment and attain all ARARs'.  In addition*
 Section 121 of CERCLA establishes several other statutory requirements and preferences. These specify that,
 when complete, the selected remedy must also be cost effective and utilize permanent solutions and alternative
 treatment technologies or resource recovery technologies to the maximum extent practicable. Finally, the
 statute includes a preference for remedies that employ treatment that permanently and significantly reduces
 the volume, toxicity, or mobility of hazardous substances as their principal element.  The following sections
 discuss how the selected remedy meets these statutory requirements.

 10.1  PROTECTION OF HUMAN HEALTH AND THE ENVIRONMENT

 The selected  remedy protects human health and the environment through minimizing exposure to the
 contaminated  soil.  The selected  remedy,  through the use of institutional/engineering  controls,  provides
 protection of human health and the environment by controlling risk through restrictive covenants, paving,
 landscaping, and construction of buildings.  EPA will periodically review the site, no less than once every five
 years, to ensure that it remains protective of human health and the environment.

 10.2  ATTAINMENT OF THE APPLICABLE OR  RELEVANT AND APPROPRIATE REQUIREMENTS

 Remedial actions performed  under CERCLA must comply with all  applicable or relevant and appropriate
 requirements (ARARs) unless a waiver is invoked.  All alternatives considered for the Site  were evaluated on
 the basis of the degree to which they complied with these requirements.  The selected remedy was found to
 meet or exceed all ARARs that have been identified in Appendix B attached to this ROD.

 10.3  COST EFFECTIVENESS

The estimated cost of EPA's selected remedy is $15,000.  Cost effectiveness is determined by comparing th4|
 cost of all alternatives being considered with their overall effectiveness to determine whether the costs are
proportional to the effectiveness achieved.  EPA evaluates the incremental cost of each alternative as compared
to the increased effectiveness of  the remedy.  The selected remedy does cost more than  the no action
alternative; however, effectiveness achieved by the remedy justifies the higher cost. The remedy is considered
cost effective.

 10.4  UTILIZATION OF PERMANENT SOLUTIONS TO THE MAXIMUM EXTENT PRACTICABLE

 EPA believes the selected remedy is the most appropriate cleanup solution for Operable Unit #2 at the
Woolfolk Chemical Works Site and provides the best balance among the evaluation criteria for the remedial
 alternatives evaluated.  This remedy provides effective protection in both  the short-term and long-term to
 potential human and environmental receptors, is implementable, and is cost-effective.

 10.5  PREFERENCE FOR TREATMENT AS A PRINCIPAL ELEMENT

 Due to the low levels and volume of the contamination  on the OU #2 properties, it is not practical to require
 treatment to  reduce the toxicity, mobility,  or volume. Therefore, this selected remedy does not meet the
 preference for treatment as a principal element..

 10.6  STATUTORY DETERMINATION

 The remedy for OU #2  at the Woolfolk Chemical site is consistent with the requirements of Section  121 of
 CERCLA and  the NCP. The selected alternative  is protective  of human health and the environment, will
 attain all Federal and State applicable or relevant and appropriate requirements, is cost-effective, and utilizes
 permanent solutions to the maximum extent practicable.   The remedy will  not reduce the mobility, toxicity


                                               26

-------
and volume of contaminated soil through treatment at the Site due to the impracticability of treating low
levels and volumes of contaminated soils.  The remedy for OU #2 is consistent with previous and projected
remedial actions at the Site. Based on the information available at this time, the selected remedy represents
the best alternative when balanced against the criteria used to evaluate remedies, especially in light of the
ongoing removal action.


11.0  DOCUMENTATION OF SIGNIFICANT CHANGES

Upon further review of the proposed performance standards subsequent to the issuance of the Proposed Plan,
EPA determined  that certain adjustments to the performance standards were warranted.  An error was
determined to have occurred in addressing the standards for the protection of ground water. EPA also obtained
further clarification of the criteria to meet State  concerns.  EPA revised the performance standards in a
memorandum to the Administrative Record on August 25, 1995.  This memorandum established the revised
performance  standards and slightly revised the preferred alternative selected in the Proposed Plan. The
revised alternative no longer considered the contingency since existing lindane concentrations were found to
be protective.

EPA also modified the alternatives presented in the Proposed Plan due to the revised performance standards.
The Proposed Plan discussed the need to further characterize one property (313 MLK) in order to confirm the
presence of lindane. This was assumed to be needed due to the pre-removal lindane concentration which was
above the performance standards presented in the  Proposed Plan. This performance standard, however, did
not consider the effects of degradation of the contaminant.  Therefore, EPA revised the performance standard
to consider degradation effects and found the pre-removal concentration  was below the revised  standard for
lindane and was, therefore, already protective.

This revision affected  Alternatives #2,  #3, #4, and  #5.  Alternative #2  was found  to no  longer need  a
contingency  for the removal of material from 313  MLK.  The contingency, though not directly part of
Alternative #2, was presented as part of the preferred alternative. The number of properties to be excavated
in Alternatives #3 and #4 were also revised due to the revision of standards.  This decreased  the cost and
increased the short-term effectiveness of these alternatives but did not alter the preferred alternative. Finally,
alternative #5 no longer needed the excavation of 313 MLK but was found to need  the excavation of another
property discussed below.

Initially, the upperbound risk level for dieldrin on 204 Oak Street was calculated by EPA to be 1.4xl05, which
is within the protectiveness range established by EPA at IxlO"6 to  IxlO"4. The initial revised  performance
standard for  dieldrin was established at a risk level of 1.5x105 (1.6  ppm).  Alternative  #5  was,  therefore
revised from excavation of 313 MLK to excavation of 204 Oak St. in order to consider the option of excavating
to a risk level at or below IxlO"5 for all contaminants. This change to. the revised performance standard did
not change the preferred  alternative of the proposed plan.

Based on public comment received during the public comment period, EPA revised the performance standards
a second time.  The initial revised  standards confused dermal absorption factors in calculating values
presented in the August 25 memorandum tables.  The second revision of the performance standards did not
affect the selected remedy but eliminated Alternative #5 from further consideration since dieldrin was found
to be below the established risk  level of IxlO'5. Chapter 6 presents the corrected risk values for all scenarios
and the corresponding corrected performance standards.
                                                27

-------
             APPENDIX A:




      RESPONSIVENESS SUMMARY








   WOOLFOLK CHEMICAL WORKS SITE




RECORD OF DECISION, OPERABLE UNIT #2:




 FORT VALLEY, PEACH COUNTY, GEORGIA

-------
                              RESPONSIVENESS SUMMARY
                          WOOLFOLK CHEMICAL WORKS SITE
                      OPERABLE UNIT #2: SOIL CONTAMINATION
                       FORT VALLEY, PEACH COUNTY, GEORGIA


The U.S. Environmental Protection Agency (EPA) held a public comment period from July 19, 1995
through September 15, 1995 for interested parties to give input on EPA's Proposed Plan for Remedial
Action at the Woolfolk Chemical Superfund Site in Fort Valley, Peach County, Georgia.  A public
meeting was conducted by EPA on August 29, 1995, at the Peach County Courthouse in Fort Valley.
At the meeting EPA presented the Proposed Plan for the Woolfolk Chemical Works Site, Operable Unit
#2, which was based on the results of the Remedial Investigation and Feasibility. Study (RI/FS).

A responsiveness summary  is required  to  document how  EPA addressed  citizen comments and
concerns about the Site,  as raised during the public comment period.  All comments summarized in
this document have been factored into the final decision of the remedial action for the Woolfolk Site.

This responsiveness summary for the Woolfolk Site is divided into the following sections.

       I.      Overview - This section discusses the recommended alternative for remedial action and
              the public reaction to this alternative.

       II.     Background on Community Involvement and Concerns: This section provides a brief
              history of community interest and concerns regarding the Woolfolk Site.

       III.     Summary of Major Questions and Comments Received During the Public Comment
              Period and EPA's Responses: This section presents comments submitted during the
              public comment period and provides the respo.nses to these comments.

       IV.     Concerns to be Addressed in the Future: This section discusses community concerns
              of which EPA should be aware during future actions.


I.     Overview

The preferred remedial alternative was presented to the public in a Proposed Plan  released on July
18, 1995. A public meeting was held August 29, 1995 with about 100 people attending.  Due to the
past removal actions at the site, limited further action will be required on the thirteen (13) properties
proposed for a redevelopment project as discussed in this Record of Decision (ROD).  In order to
implement this remedy, EPA will require:

       •  land use  consistent with the  proposed redevelopment plan for the new Peach County
       Library Building;

       • land use consistent with the renovation of two existing structures located at 201 Oakland
       Heights and 202 Oak Street for  the purpose of an  office building and an adult education
       center, respectively; and,

       • placement of institutional controls to ensure that future land use is non-residential  and
       groundwater beneath the site cannot be used for any purpose  as stipulated in this Record of
       Decision.

EPA has entered into a Prospective Purchaser Agreement with the Peach County Libraries Board, the
Fort Valley Redevelopment Authority,  and the  Peach County Chamber of Commerce.  The ROD is
based on the assumption that proposed properties will be transferred to these entities and redeveloped
for use as a library, an office building, and an adult-education center. If this project does not proceed,


                                            A-l

-------
 it will be necessary to re-evaluate this record of decision. EPA will continue to review the progress
 of the redevelopment project and whether or not the remedy remains protective.

 There is significant support in the  community for the concept of reusing this property. Support for
 redevelopment of this property  is varied  including those  who do  not  wish  to  see  this property
 redeveloped.  Some members of the community opposed the redevelopment plan and requested that
 the OU #2 properties be cleaned up to residential standards.  Concern was raised regarding the
 protection of human health and EPA believes this remedy is protective.


 II.    Background on Community Involvement and Concerns

 EPA has made significant efforts to insure that interested parties have been kept informed and given
 an opportunity to provide input on activities at the Woolfolk Chemical Works site. EPA has been
 working with the community surrounding the Woolfolk Chemical Works  since 1990.  In September
 1990, press releases informing the community about the  NPL listing  of the site were released.
 Subsequent interviews were  held that Fall to  develop a Community  Relations Plan fCRP).  The
 information repository was established  in October 1990, at the Thomas Public library, 213 Persons
 Street, Fort Valley, Georgia. The CRP, which was finalized in November 1990, has been placed in the
 information repository. In January 1991, EPA held a public meeting to discuss the start of the RI/FS.

 In July 1993, EPA issued a press release and fact sheet on the findings of  the RI study regarding soil
 contamination and health precautions recommended by the Agency for Toxic Substances and Disease
 Registry (ATSDR). On August 2-3, 1993, EPA conducted door-to door visits to the potentially affected
 residents to further distribute the fact sheet and extend our invitation to an availability session. The
 availability session, held on August  3, 1993 discussed the  results  of the RI study and ATSDR's
 recommendations for health precautions. Fifty people attended the session which was hosted by EPA,
 the Georgia Environmental Protection Division (GaEPD), and ATSDR. Representatives of Canadyne-
 Georgia Corporation (CGC) were also present.

 EPA's Emergency Response and Removal Branch has determined the extent of off-site contamination
 which needs immediate response, has excavated contaminated soils from  the majority  of residential
 properties,  and completed the destruction of an on-site, dioxin-contaminated building (Building E).
 EPA has met numerous times with the residents  individually and held public meetings throughout
 this  process.  CGC is complying with  an  Unilateral Administrative  Order (UAO) requiring the
 disassociation of the affected residents from contaminated soils and destruction/removal of Building
 E.

The Feasibility Study, the Proposed Plan, and the Administrative Record (AR) for OU#1 were released
 to the public on January 18, 1994.  These two documents were  made  available in both the AR,
 maintained in the EPA Region IV Docket Room, and the information repository at the site.  The notice
 of availability  of these documents and the  AR was published on January 18,  1994 in various local
 publications.  A public comment period was held from January 18, 1994 to February 17, 1994. In
 addition a public meeting was held on February 1, 1994. At this meeting representatives from EPA,
ATSDR, and the State of Georgia answered questions about problems at the site and the remedial
 alternatives under consideration.

 EPA also hosted a series of five meeting with a group of eleven community members representing
 different views throughout the community.  The group formed under the already existing TAG group
 and was called the Community Information Exchange Group (CEIG). The purpose of the  group was
 to allow EPA to explain to a greater degree the activities at the site while  receiving input from the
 community on  issues of concern  to them.  The CIEG met from March through June 1995 and
 concentrated on issues related to OU #2 and future actions at the Site.

 A Feasibility Study Addendum,  a Proposed Plan, and an Administrative Record for OU #2 were
 prepared and  made  available to the public on July  18, 1995.  These two documents were made


                                            A-2

-------
 available in both the AR, maintained in the EPA Region IV Docket Room, and the information
 repository at the site. The notice of availability of these documents and the AR was published on July
 18, 1995 in various local publications.  A public comment period was held from July 18, 1995 to
 September 15, 1995.  In addition a public meeting was held on August 29, 1995.  At this meeting
 representatives from EPA and the State of Georgia answered questions about problems at the site and
 the remedial alternatives under consideration.  Responses to the comments received during this
 comment period are presented in the responsiveness summary in Appendix A of this document.

 III.    Summary of Major Questions and Comments Received During the Public Comment
       Period and EPA's responses


 Concern  1;  There were  many comments raised regarding the proposed redevelopment
 project.  The issues involved the  risks associated with the proposed future use, zoning
 requirements, the Troutman House, etc...

 EPA Response: The basic concept behind redevelopment is based on the evaluation of the risks
 associated with the future use of the property. The OU #2 properties have been purchased by CGC
 and have been offered to  three local entities in order that they may redevelop these properties for
 productive use.  The proposed future use is non-residential. EPA has evaluated the risk associated
 with non-residential use of these properties and found it to be acceptable.  The properties are not
 protective  if they are used for  residential purposes. A portion of the associated costs for cleaning to
 residential standards have been set aside as local funding for a state grant to construct a new library
 on a portion of the OU #2 properties. Other savings were used to purchase the property and prepare
 it for the potential construction project.

       EPA believes that the proposed future use of the property is protective of human health. There
 are other aspects of the project which will need to be addressed before transfer of the property is
 considered.  To ensure that  the proposed use  remains residential, EPA will require that restrictive
 covenants be placed on each of the properties to ensure that future use remains non-residential. CGC
 and the Peach County Libraries are continuing their negotiations regarding the transfer of property.
 If there is a breakdown in  the process toward redeveloping these properties EPA will re-evaluate this
ROD.

       Certain properties are currently zoned for residential use.  It is EPA's understanding that the
proposed use of these properties is non-residential.  Though added protection from reverting these
properties may be provided by zoning changes, these zoning changes are not required for the proposed
project. Each of these properties will have restrictive covenants placed on them and will be enforced
by EPA through a Prospective Purchaser Agreement (PPA) with the future owners.  EPA will also
periodically  review  this ROD to ensure that it remains protective of human health and  the
 environment.

       There was a comment related to the Prospective Purchaser Agreement (PPA) and the need and
 use of the  agreement.  People are often reluctant to use property associated with a Superfund site.
 One of the reasons for this is the potential to be held liable for Superfund contamination. In an effort
 to relieve future developers from the liability  of past contamination, EPA can promise, through the
 PPA, that it won't hold the future owner liable for past contamination.  EPA must believe that the
 future  use  of the property  is protective and  the future owner was not responsible  for the past
 contamination practices. EPA has entered into a PPA with three entities proposing to redevelop these
 properties.  This agreement, however, does not prevent other parties from bringing legal action against
 these entities.

       A major issue raised at the public meeting was concerning the risk to children who might come
 to visit the library and may  live in the neighborhood. EPA evaluated the risks associated with both
 of these individuals and found the future use protective. The properties were also evaluated on their
 potential use as residential  properties. This use is  considered unacceptable to EPA at the current


                                            A-3

-------
contamination levels and, therefore, EPA is requiring the placement of restrictive covenants which will
prevent the future use of these properties for residential purposes.

       Throughout the evolution of the redevelopment project the concept behind redevelopment has
remained the same.  Some feel they have been deceived on the extent of the redevelopment proposal.
EPA made efforts to clarify the ever changing property limits being considered for redevelopment in
OU #2. EPA would also like to encourage those in the community who want to learn more about the
project to contact the local entities which have proposed the project.

       There was also a number of questions regarding the need for the Troutman House project to
be approved and not to be affected by the proposed library project. EPA considered this comment but
believes that to separate these  two projects at this point would be counter-productive.  EPA believe
both projects  are protective and through this ROD establishes the standards for both projects to
proceed concurrently.

       The role of City government was also an issue.  EPA considers City government requests in
balancing the nine criteria used to select a remedy as part of community input.  There have been a
number of City  Resolutions regarding the overall remediation  at  this site.  The  latest resolution
provided to EPA asked for remediation of soils  to background levels for all of the properties which
would then be considered for redevelopment.  EPA, however,  rarely remediates to background levels
when it is possible to establish performance standards based  on a site-specific risk assessment. The
most  protective standards,  residential use  standards, are not  consistent with  the concept of
redevelopment as the proposed use for the properties is non-residential. This inconsistency would add
a measure of protectiveness since non-residential use properties would be  remediated to residential
standards. However, this extra measure of protectiveness is not required. If these properties are not
redeveloped in a timely manner, EPA will revisit this decision to ensure protectiveness.

       EPA believes that there is  a need for further discussion on the local level  regarding the
redevelopment project. As the project is proposed, it is protective.  At the public meeting, there was
considerable debate over the future use of the OU #2 properties.  Some of the residents, including
many on Oak Street, were skeptical of the project while others felt the need to begin to revitalize the
City. All were concerned about protecting human health.  EPA wishes to state, once again, that the
non-residential use of these properties, as proposed, will be protective.


Concern  #2;  There is  a concern that contamination from the OU #2 properties may have
              been affected by the  flooding over the past few years  since the testing of
              these properties. Will OU #2 properties contaminate  other properties in the
              future.

EPA Response; The OU #2 properties are located in an area  which is elevated from other areas with
higher site related contamination. The MLK properties are sloped to%vard MLK street while the Oak
Street  properties drain to both MLK properties and Oak street.  Flow of contamination from the
Woolfolk plant (OU #3) property to redevelopment (OU#2) properties is highly unlikely and, therefore,
no further testing  is  required.  The  pre-removal  data used to evaluate the risk is actually  a
conservative estimate of the risks due to the removal actions (removal  of a  portion of soils on the site
with high arsenic concentration) taken  on the OU #2 properties.

       Due to the slope  of the properties, the relative low levels of contamination, and the future
engineering controls which will be enforced  through the  Prospective Purchaser Agreement,  EPA
believes that there will be no contamination flowing from OU  #2 properties to other areas. Migration
off OU #2 areas prior to placement of engineering controls is not expected to be problematic due to the
relatively limited slope of the properties and the low concentration  of the contaminants.
                                            A-4

-------
 Concern #3;  There was considerable  concern  raised  in  regard to the sampling  of
              residential properties and interior house dust sampling.

 EPA Response; EPA's Emergency Response and Removal Branch has completed the sampling of the
 areas of concern with regard to the residential soil and interior house dust.  As part  of the long term
 aspect of the project, the EPA's Remedial (long-term clean up) Branch will evaluate the actions taken
 by the Removal team to determine if further action is warranted with respect to residential soils and
 house dust.

       There are eight homes which were found with levels of arsenic contamination in the living
 areas which the removal program plans for clean up in Fall/Winter of 1995, assuming that budget cuts
 do not effect the Removal program operations. EPA continues to evaluate attic dust and living space
 house  dust issues for long-term  exposure, which will be addressed as part of  OU #3.  EPA, in
 consultation with  the State of Georgia, will determine the need for  further residential soil sampling
 during the same period.


 Concern  #4:  What federal  regulation allows a public entity to conduct negotiations that
              are not accessible to the general public?

 EPA Response:   EPA generally seeks to  have potentially responsible parties (PRPs) perform
 Super-fund cleanups where PRPs can  be  identified and they are capable of doing the work. This
 conserves Superfund resources. When  EPA identifies a PRP and seeks to require the PRP to perform
 a cleanup, EPA will initially seek to negotiate a Consent Order for cleanup, and if one cannot be
 negotiated, EPA may either perform the  cleanup itself, or issue a  Unilateral Order to the PRP to
 perform the cleanup.                                                                    •

       The terms of Consent Orders for implementing a cleanup are the subject of negotiations which
 do not include the general public.  It would not be possible to effectively negotiate such an order with
 participation of the general public, and  there is no legal requirement that the public be invited to such
 negotiations.  Similarly, when  a Consent Order is negotiated, there is usually a provision governing
 the resolution of disputes between EPA and the PRP that arise during implementation of the cleanup.
The  dispute resolution provision  of the Consent Order between CGC  and EPA for the Remedial
 Investigation, for example, calls for negotiations to resolve disputes over implementation of the Order.
 Such negotiations do not include the general public. If the cleanup  is being conducted pursuant to a
 Unilateral Order rather than  a Consent  Order, disputes often  arise  between EPA and PRPs over
 implementation issues that are resolved through negotiations between EPA and the PRPs.  It would
 not be feasible to include the public in each implementation issue which becomes the  subject of
 discussion between EPA and PRPs and there is no requirement to do  so.

       The Superfund law does require that the public be involved in  and have  an opportunity to
 comment on the selection of remedial actions.  EPA must consider  community input in the remedy
 selection process.  EPA has made extensive efforts to involve the community in the remedy selection
 process at the Woolfolk Site and has considered community input in making remedial decisions.


 Concern  #5:  Why was there no alternative which requires  cleanup of OU #2 properties
              prior to placement of the library?

 EPA Response;  Alternatives  #3 and #4 both consider the remediation to residential standards of the
 residentially zoned properties.  MLKDrive properties are considered  commercial and are being cleaned
 to commercial standards.  The Oak Street properties are proposed  for institutional use which is
 protective of human health and the environment. Since the proposed use of these properties is non-
 residential, there is no need for further cleanup.
                                           A-5

-------
Concern #6:  Why does EPA continue to select remedies, including alternative use, without
              input from surrounding property owners and business owners next to the
              purchased property.

EPA Response; EPA has made considerable effort to receive input from the community. A number
of public meetings have been held regarding OU #2, including the public meeting of August 29, 1995
and  five meeting with  the CIEG.  The  purpose of these meetings was to receive input from the
community surrounding the site. In arriving at a selected remedy, EPA must balance all  of the
comments received in order to make an informed decision.


Concern #7;  What was EPA's involvement in the property purchase program?

EPA Response: EPA was not involved  in the property purchase program.  All property purchases
were made pursuant to negotiations between the private parties.


Concern #8:  The semivolatile target analyte dibenzofuran was detected in two samples
              collected at the subject site in amounts of 51  and 81  ug/Kg (ppb).   The
              comment was made that this analyte was detected in the samples that were
              "analyzed with reasonable resolution" and that the other samples are value-
              less in examining for low ppb level of dibenzofuran.

EPA Response: The reported amounts of dibenzofuran are both below the contract required quanti-
tation limit (CRQL) of 330 ug/Kg.  However, it should be noted that the mass spectrometer/gas
chromatograph (GC/MS) methodology employed by the  laboratory has the capability to accurately
detect target analytes in amounts well below the CRQL. Moreover, the contract laboratory is required
to report all compounds meeting the qualitative identification criteria. The USEPA CLP Statement
of Work for Organic Analyses, Exhibit D/SVOA, paragraph 11.1.1.4, states "When target compounds
are below CRQL but the spectrum meets the identification criteria, report the concentration with a
"J"."  The J qualifier indicates an estimated value. Under Region IV validation criteria, analytes with
concentrations below 0.1 of the CRQL are  not reported. The J data qualifier flag is reported when the
analyte  amount is below the CRQL.

       Examination of the reported data show that the laboratory achieved a CRQL of between 340
and 360 ug/Kg for 22 of the 24 samples. The variation in the CRQL (detection limit) was apparently
caused by moisture in the samples.  Two of the samples had higher CRQLs of 450 and 8900 ug/Kg;
it is not known what caused the elevated CRQLs of these two samples. Since the methodology has
the capability of accurately detecting the  target analytes in amounts as low as 0.1 of the CRQL, the
reported data from 22 of the 24  samples would have revealed the  presence of dibenzofuran  if this
target analyte had in fact been present in the samples.


Concern #9;  The comment was made to assume, "for the  sake of parsimony", that the
              dibenzofurans in samples collected at the subject site were chlorinated.

EPA Response; The target analyte dibenzofuran, CAS Number 132-64-9, does not contain chlorine.
The empirical formula for this target analyte is C12H8O. The methodology employed by the laboratory
for analysis of samples collected at the subject site uses a mass spectrometer for the identification of
gas chromatograph peaks. The presence of chlorine would significantly alter the spectra of the suspect
peak. Rigorous qualitative identification criteria are specified in the analytical methodology. The
laboratory would, therefore, not identify the suspect peak as dibenzofuran; the suspect peak would be
identified and reported as a tentatively identified compound by the  laboratory.
                                          A-6

-------
Concern #10: One comment believed that the scope of OU #2 should be expanded to include
              additional, non-residential off-site properties.  The properties included the
              former flour mill, several lots north of Railroad street, 305, 306, 325, 327, 328,
              330, and 400 Martin Luther King, Jr. (MLK) Drive. The commentor remarked
              that these properties were evaluated along with OU #2 properties, that the
              contaminants of concern are similar, the land use is .similar, and the proposed
              performance standards are likely to be met.

EPA Response; EPA separated the OU#2 properties on the basis that they were proposed for use
in a redevelopment project and  EPA believed that enforcing the future use of these properties is
reasonably possible.  Though EPA believes that the off-site  properties  proposed for inclusion have
similar contaminants, it is not certain that these properties will be used for similar purposes as those
in the redevelopment  project.  Prior to the removal action, 305, 327, 328, 330, and 400 MLK were used
for residential purposes. Since the potential exists, as indicated by past and present use, for these
properties to be used  for residential purposes, EPA believes that these properties  are not similar in
land use to the redevelopment properties.  This doubt, and the need to  expedite the redevelopment
properties, forms the  basis for not including these properties in OU #2.

       Another aspect which facilitated the use of only redevelopment properties  in OU #2 was the
ease with which institutional controls could be placed on these properties and the potential to enforce
these controls in the future. There was the potential for the land owners of the former flour mill, the
vacant lots north of railroad street, 306 and 325 MLK not to accept the  restrictive covenants which
are going to be placed  on the redevelopment properties. The potential would have remained to convert
these properties to residential use.  As per the guidance entitled Land Use in CERCLA Remedy
Selection Process (May 25, 1995), EPA  should determine: " ...  the existence  of the authority to
implement the institutional control, and the appropriate entity's resolve and  ability to implement the
institutional control."  Sufficient support could not be shown in the feasibility study to conclude that
effective implementation of institutional controls could be expected for these properties, so EPA did
not be included them  in OU #2.


Concern #11; EPA has not provided sufficient basis for revising the performance standard
              for dieldrin.

EPA Response; Based on this comment, EPA reviewed the performance standards proposed in the
Proposed Plan and its update. EPA found an erroneous dermal adsorption factor had been used to
calculate the pesticide and semi-volatile organics performance standards. EPA corrected this error
and has established the correct performance standards in Table 9-1 of this ROD.

Concern #12; Further soil excavation is not required at 204 Oak Street to protect human
              health and the environment.

EPA Response; EPA will not require further excavation of 204 Oak Street if the actions in this ROD
are implemented and the proposed use of the property is not changed.


Concern #13; What is the atmospheric duration period for the contaminants of concern and
              are they similar to insecticides used in the yard which have  a  tendency to
              stay in the air.

EPA Response; Very few of the chemicals of concern at the site are considered to be volatile based
on a Henry's Law constant greater than 10E-5.  The ones that met this criteria were found in surface
soil very infrequently or at low (mg/kg) concentrations. Therefore, no build up in ambient air of vapor
concentrations to levels of any health concern would  be considered likely. Many of the chemicals of
concern would be expected to bond to soil particles and would become airborne with dust due to wind
action.  Again, the soil level are at low concentrations and air concentrations  of particle bound


                                           A-7

-------
substances would be expected to be extremely low and of no health concern.  As an additional
precaution, EPA will require  dust suppression  measures to be applied during the construction
activities.


Concern #14; There was one comment which confused the 48 contaminants of potential
              concern in the Baseline Risk Assessment with the Contaminants of Concern
              for OU #2.  The commentor was concerned that we weren't considering all of
              the contaminants.

EPA Response: EPA has sampling results from the OU #2 properties which were analyzed for a full
scan of  metals, semi-volatile  organics,  and pesticides/PCBs.  These  scans  are  able  to  detect
approximately 150 different contaminants that may be present in a particular sample tested. The
chemicals detected in OU #2 sampling in surface soils were eliminated from further consideration only
if: 1) chemicals were detected in less than 5% of the samples analyzed or; 2) the detected concentration
of the chemical in the soil is similar to background concentrations.

The chemicals of concern (COCs)  are those contaminants which show an unacceptable risk once the
risk assessment is complete. The 48 chemicals of potential concern (COPCs) in the Operable Unit #1
ROD were screened based on the sampling results from the groundwater. Performance standards are
set for 17 of those which were of concern (COCs) after the risk assessment.  There were 24  COPCs
which were carried through the risk assessment for the OU #2 properties.  Of these, 22 are of concern
for OU #2 and have performance standards set by this ROD. Each time an evaluation of risks is
performed in a risk  assessment, there is a process used to develop performance standards for those
chemicals which are of concern.


Concern #15; There was a comment which expressed concern over the consideration of a
              toxic waste landfill on the former Woolfolk property.

EPA Response;  EPA is considering the placement of a landfill on the former Woolfolk property.
Alternative #3 evaluated the potential to dispose of OU #2 contamination in the on-site landfill. This
has not been chosen as the remedy for  OU #2. This issue will be revisited and evaluated in future
Operable Units.

Concern #16; Many concerns were raised by the public regarding their health.

EPA Response; EPA is not qualified to discuss health aspects. However, EPA has referred these
individuals with particular health concerns to the Agency for Toxic Substances and Disease Registry
(ATSDR). ATSDR provides assistance to EPA on health-related issues at Superfund sites.


Concern #17; There was a question on how EPA could issue a record of decision  before
              other portions of the site were complete.

EPA Response; EPA has the ability to divide the site into different portions (e.g. area, different
media) in order to facilitate remediation of portions of the site.  Actions for all of the portions must,
however, be consistent. For example, EPA does not have to pick a remedy for the groundwater at the
same time as is chosen for the  soils.  However, the soils must be cleaned to a level which  would not
recontaminate the groundwater. At the Woolfolk site, there are currently three portions, .or Operable
Units, to the remediation: the groundwater, the soils on the proposed redevelopment properties, and
the remaining sources of contamination at the site.
                                           A-8

-------
 Concern #18; What is the basis for different action levels between Woolfolk Chemical and
              other EPA sites across the nation.

 EPA Response: The baseline risk assessment and remedial actions at Superfund NPL sites are site
 specific.  Neither of these documents are precedent setting for decisions at other sites since many
 factors are involved  in the final decision. The aspect that must be consistent is that Agency action
 must be protective of human health and the environment.


 Concern #19: It appears that the level chosen as the remediation level at Woolfolk was
              based on something other than true local background (uninfluenced by the
              site) if you compare the sampling results of the backfill to the screening
              levels used by CGC in the risk assessment.

 EPA Response: The sampling results of the backfill are not a true representation of background at
 the site. Backfill was chosen specifically to ensure that no further cleanup would be required on these
 properties and, therefore, does not give an adequate reflection of true background.  The action level
 chosen for the arsenic removal action in residential areas near the site was based on protective levels
 in children for the systemic toxicity effects of arsenic. This level was also within the Superfund lifetime
 protective level for skin cancer that may be associated with oral ingestion of contaminated soils.


 Concern #20: Does OU #2 meet with the ARAR, Georgia's Hazardous Site Response Act.

EPA Response: The HSRA was considered in developing action levels for this operable unit, but it
was not considered an ARAR.  However, EPA believes that the OU #2 performance  standards are
consistent with HSRA and GaEPD has deferred to EPA on the efficacy of the ROD.


Concern #21; Lead arsenate:  Why  is lead and arsenic  not added as per HSRA?  Lead
              arsenate is stable and insoluble until placed in a low pH environment.  This
              makes it available in the soil or house dust environment where the receptor
              may  be the human stomach.

EPA Response; There is no toxicological or programmatic basis for adding together the lead and
arsenic levels in soil samples relative to obtaining a single intake level. Lead and arsenic are believed
to have independent adverse effects.  In addition, there is no combined lead/arsenic reference dose to
compare such a value for obtaining a common hazard index.


Concern #22: Lead: The continued failure of EPA to force consideration of the impacts of
              lead  on the hazard index at Woolfolk has become unacceptable. What is the
              risk action level for lead?  The 1993 Risk Assessment indicates that up to 4.2%
              of the children exposed to off-site soils would be expected to have blood lead
              levels above lOug/dL of blood. This assumption ignores that the homes may
              be much more contaminated with lead than the soil.

EPA Response: Lead risk cannot be evaluated through the calculation of a Hazard Index since the
EPA has not established a reference dose for lead. EPA has evaluated the  soil lead  level  in the
residential area using a pharmacokinetic  model consistent with OSWER guidance.  This model
integrates lead exposure from all major  sources including house dust and yields a protective default
 soil lead level of 400 mg/kg.  The model is not  appropriate for the evaluation of lead risk for children
in non-residential exposure scenarios or for adults in any exposure scenario.  EPA currently has no
 guidance on  a methodology for determining protective levels for these receptors.  Traditionally the
 Superfund program  has considered surface soil  lead levels in the range of 500 to 1000 mg/kg as
 protective. This position was based on earlier work by the Centers of Disease Control and Prevention


                                          A-9

-------
 that indicated blood lead levels do not increase from exposure to contaminated soil until the soil lead
 level exceeds this range.  The clean up goal based on ground water protection is 625 mg/kg compared
 to a maximum detected level of 570 mg/kg and a mean of 193 mg/kg in surface soils samples collected
 in the OU #2 area.  These levels are  believed to be protective for all receptors evaluated in the
 Baseline Risk Assessment (BRA) Addendum and revised risk calculations.  It should also be stated
 here that there is concern that additional sources of lead may exist in the residential area, i.e. chips
 from lead-based paint used in the homes. EPA initiated an effort to have children living in the area
 tested for blood lead levels.  No evidence of elevated blood lead levels was shown in the test results.


 Concern #23: Arsenic: The slope factor...Taiwanese studies... arsenic performance standard
              based on groundwater protection.   In the  ROD OU#1 the slope factor for
              arsenic  was 1.8 mg/kg/day, why was this change for OU #2 to 1.5 mg/kg/day.

 EPA Response: EPA considers arsenic a substance that can cause cancer and systemic toxicity in
 humans.  Its human carcinogenicity is most strongly supported from studies in smelter workers with
 lung cancer. The evidence for arsenic as a skin carcinogen from oral ingestion of contaminated
 drinking water is less well supported and is based primarily on studies of an exposed population in
 Taiwan.  Other studies of populations exposed to arsenic contaminated drinking water have not shown
 an association with elevated cancer rates. Very little  data exist on cancer or any other toxic effects
 from exposure to arsenic contaminated soij. Arsenic is a natural constituent of the earths crust and
 it can be safely assumed that mankind has always had some exposure to this substance. There are
 published scientific studies that indicate that the body can readily detoxify daily arsenic intake levels
 up to  200 micrograms.  There  is also suggestive evidence that traces of arsenic  in the diet may be
 essential for good health. Therefore, the level of arsenic in soil that poses an adverse health effect is
 not obvious.

       EPA has chosen to base the action level for arsenic in soil at this site on a protective level for
a child against systemic  toxicity effect when compared to a conservative reference level.  This level is
also protective for a person exposed to  the site for 30 years against cancer effects at the Agency's
upperbound risk level of between 1 additional chance in 10,000  to 1 additional chance in 1.000,000.
The upper bound cancer risk is calculated by using the cancer slope factor value  of 1.5 (mg/kg/day)'1
that was recently placed in  EPA's IRIS database.


Concern #24; It appears  that  the valance state of the metals and pH of the medium have
              been ignored  throughout the entire cleanup and each of it's phases.  The
              example given was arsenic.

EPA Response; The metal cation is considered as the toxic component of heavy metal compounds.
The IRIS database contains toxicity information on the metals  per se. The  metal species and form
 present at the site tend  to have importance relative to bioavailability.  In consideration of the risk
 determination of the primary toxJc metal at this site, arsenic, bioavailability was considered to be 80%.
This assumption compares with published levels typically in the 30 to 50% range.


 Concern #25; Final Appendix A:  What happened to the future  off-site child?  It  also
              appears  that  the current off-site child will  still be the off-site child under
              future conditions, probably the child trespasser, and the future child patron.
              This would appear to  be the  most sensitive  receptor about whom we should
              be  concerned. What about the off-site child receptor during construction?

 EPA  Response;  The risk levels have been calculated for the current off-site  child resident, the
 current off-site child trespasser onto the site, and the future child patron of the library. No risk levels
 were found  to be at unacceptable levels.  Future exposure to off-site child residents during library
 construction is not expected to  increase due to the requirement for dust suppression measures during


                                            A-10

-------
the construction period. The future off-site child resident was believed to have less exposure than the
current off-site resident due to the proposed use of the property (i.e. coverage of soil by buildings,
paving, or 6" of topsoil).


Concern #26: We respectfully request that EPA undertake extraction tests (e.g. TCLP) to
              simulate bioavailabilities of lead and arsenic on the site.

EPA Response: EPA believes it has applied conservative assumptions to its evaluation of lead and
arsenic risk and does not anticipate conducting further bioavailability tests. Solubility tests do not
equate to bioavailability tests.  To truly conduct meaningful site specific bioavailability tests for lead
and arsenic, in vivo feeding studies in an appropriate animal species would be required. Such studies
would be expensive, time consuming, and often do not produce definitive results.


Concern #27: Can EPA ignore state and community issues, such as in-community landfill,
              permanent storage of dioxin, or leaving the current arsenic and lead landfill
              in place?

EPA Response; EPA must consider all of the comments it receives before selecting a remedy.  If an
alternative  did not meet with state and local concerns, EPA would first attempt to resolve those
concerns. However, if no acceptable alternative were available, EPA might have no other option than
to chose a remedy without state and/or community acceptance. EPA might, however, be able to modify
an unacceptable alternative to address specific community concerns.  The specific concerns in this
comment are issues that EPA will seek community input to in all future operable units.


Concern #28: What will happen with the remaining residentially zoned properties?

EPA Response:  EPA will address the  remaining contaminated residential properties in future
operable units and  in  the removal action.


Concern #29; Where are the plans showing 85% coverage at the library site by impervious
             surfaces?  When will these sites actually be redeveloped? Will this big blank
             actually be redeveloped?

EPA Response; EPA has used preliminary drawings of the proposed library, adult education center,
and Fort Valley Redevelopment Authority projects to estimate the 80% coverage. These drawings are
available from the local  entities  or  copies  can be obtained from EPA.  The time-frame for
redevelopment of these properties is approximately three years after signing of this record of Decision.
EPA believes that the  redevelopment project will proceed as planned; however, if it does not, EPA can
re-evaluate this ROD  in the future.
Concern #30; What is  the paving percentage on the  other sites?   Is EPA funding the
              redevelopment project?

EPA Response; The paving percentage for the site as a whole is 80%, not on individual properties.
Funding for redevelopment is explained in  concern #1.   EPA funding is not being used for the
redevelopment project.
                                          A-ll

-------
Concern #31; Why has zinc been ignored in the Final Baseline Risk Assessment (BRA)
              considering its known wildlife effects?

EPA Response:   There are no  ecological  chemicals of concern  for OU#2 since  the  planned
development of the property will not provide an ecological habitat. However, clean up levels for COCs
protective of human receptors are believed to be protective for terrestrial species.


Concern #32; A statement made in the BRA addendum on page 3-3, in the last paragraph,
              was  not found in the reference provided.  The number given was 10 times
              higher than that used by CDC and EPA in other documents.

EPA Response;  The statement referred to in the BRA Addendum is not the basis for any site
decision on lead. The lead soil screening level and the IEUBK (Integrated Exposure Uptake Biokinetic)
model default for soil lead is 400 ppm. Decisions on acceptable lead levels at a Superfund site are
based on site-specific application of the IEUBK model  for protection of children or ground water
protection modeled values.


Concern #33: The soil to dust default value of 0.70 is not supported, since testing of dust in
              many homes shows levels of arsenic and lead greatly exceeding the property
              soil levels. There is also an assumption that coverage of the soil with paving
              will reduce the fraction of soil  ingested.  This is then corrected by 0.70 to
              account for the amount of dust contributed by the outdoor soil to house dust.
              It would appear  that the  multiplication  of both factors  may-be under-
              estimating the effect since outdoor dust in the library would probably still be
              generated mainly by the unpaved areas. The commentor, also didn't think
              that  anyone  has  demonstrated  that  cutting  the  immediate  area  of
              contaminated soil exposed to air by 50% will result in a concentration drop
              in indoor dust of 50%.

EPA Response: The 0.70 soil dust default value is presented in the "Guidance Manual  for the
Integrated Exposure Uptake Biokinetic Model for Lead in Children" as appropriate for neighborhoods
or residences in which loose particles of surface soil are readily transported into a house. EPA believes
an appropriate assumption for indoor dust is 70% comprised of soil from immediately outside a
building in areas where no other significant sources of the contaminants exist, e.g. lead-based paint
chips,in a building.  For OU #2,  EPA further believes that half of this value,  i.e. 35%, is an
appropriate assumption for the'portion of local soil that would comprise the soil exposure in buildings
associated with the redevelopment plan. This is based on  the assumption that 85% of the redeveloped
area will be covered by buildings, paving, or 6" of topsoil. Therefore, indoor dust  is  comprised of
considerably less soil from OU #2 areas.


Concern #34; In 1977, Dutkiewicz showed extensive delayed uptake of arsenic by mice, with
              skin binding occurring as much as 24 hours before appearance of arsenic in
              blood, liver, etc. This suggests caution in projecting no dermal effect if the
              arsenic/skin contact is under moist conditions. Children playing in muddy
              bare yards or ditches may be absorbing arsenic at some significant rate.

EPA Response: The BRA Addendum considered risk to the COCs from ingestion, inhalation and
dermal uptake.  The exposure assumptions are shown in the document  and are believed to be
appropriate.
                                          A-12

-------
 Concern #35; The key assumptions for the child trespasser appear distorted. The child is
              assumed to weigh 40 kg and to respire only 5 m3 of air.  More reasonable
              numbers for the average trespasser would be 30 kg and 20 m3 since these
              children would  be  metabolically  active. This  significantly changes  the
              relationship of body weight and  inhalation by a factor of  1.33  x  4 =
              5.32.Similarly if soil is moved by air to the off-site child, as assumed, it will
              also contaminate surfaces in it's environment.  No soil via ingestion or skin
              was assumed.  The value used for the child trespasser  or some significant
              fraction thereof should be used.  Child  patron parameters are biased to
              produce a lower mg/kg/day value. The commentator would suggest a balance
              for the child of 30 kg weight, 200 mg soil/day, and 20 m3 of air ventilated/day
              since children of this age have high metabolic rates.
                                       *.,•
 EPA Response; The air intake assumption presented in the BRA Addendum was unclear and EPA
 believes has been misunderstood by the commentor.  The 5 m3/d value shown does  not represent the
 daily ventilation rate but rather the amount of air intake for the assumed period of time on site (a few
 hours) for both the current child trespasser and the future child patron. The assumed weight (40 kg,
 which is the 90th percentile for 10 year old child) an older child trespasser or patron is appropriate
 for determining the exposure and risk for this receptor group. EPA also considers  100 mg daily soil
 ingestion a  conservative assumption for this age group.


 Concern #36; The baseline risk assessment did not consider or evaluate the past exposure
              of off-site residents or on-site workers.  Aren't such exposures important?

 EPA Response; The purpose of the baseline risk assessment is to evaluate the risk to current and
 future receptors to environmental media for the contaminants at the site at the current concentration
 level. It is  not the objective of the BRA to calculate risk from past exposure and would likely be
 impossible since historical media concentrations and, therefore, exposure levels are not known.


 Concern #37; It appears a "hot spot analysis" would have been more appropriate and why
              wasn't this chosen?

 EPA Response; Exposure determinations for receptors are based on media concentrations  of the
contaminants  of concern within an exposure unit.  An exposure unit is that  environment that the
receptor will contact generally in a random fashion throughout the exposure frequency  assumed in
the baseline risk assessment. Hot spots of contamination may be sufficiently large to comprise an
exposure unit and  if so the risk to the hot spot will be determined.  For the OU #2 assessment, the
entire area  was assumed to be the exposure unit. The upper confidence limit on the average or the
maximum concentration was used to obtain  the exposure point concentration.   This was  a very
conservative assumption for the child trespasser and the patron considering the likely soil exposure
patterns.


Concern #38; The risk assessment authors reduced the TCDD  (dioxin) slope factor by 15
              fold.  Does EPA agree with this?

 EPA Response;  Dioxin  contamination is not  an issue for  OU #2. However, for informational
 purposes, EPA has not changed the cancer slope factor (potency assumption) for dioxin. A rigorous
 reassessment of the carcinogenicity and toxicity of dioxins and furans is currently underway by EPA.
                                          A-13

-------
Concern #39: Was the cumulative risk to all the site contaminants taken into consideration
              by EPA.

EPA Response; The BRA Addendum and the subsequent risk calculations evaluated the cumulative
risk for six assumed current and future receptors across all COCs and the ingestion, inhalation, and
dermal routes of exposure.  The greatest calculated cumulative excess cancer risk was for the future
institutional worker at the level of 2xlO~5, well within EPA's protective risk range of IxlO"4 to IxlO'6.
All six receptors had cumulative non-cancer risk levels below EPA's protective level of a calculated
hazard index of 1.0.
IV. Concerns to be Addressed in the Future

The  Prospective Purchaser Agreement will enable EPA to follow  and enforce the redevelopment
activities and ensure that the remedy is implemented.  EPA will address house-dust concerns as part
of future operable units and in the removal action. CGC has submitted a response to EPA comments
on the feasibility study for OU #3. Review of these responses are scheduled for October, 1995.  EPA
will continue to work with the Fort Valley community to get input on future remediation decisions.
                                           A-14

-------
                        APPENDIX B




APPLICABLE OR RELEVANT AND APPROPRIATE REQUIREMENTS (ARAR)




                           AND




               "TO-BE-CONSIDERED" GUIDANCE









             WOOLFOLK CHEMICAL WORKS SITE,




            RECORD OF DECISION, OPERABLE UNIT #2

-------
Appendix K
Record of Decision, Operable Unit #2, Woolfolk Chemical Works
ARARs AND " TO BE CONSIDERED"
Item
SDVVA MCLs and MCLGs
Georgia requirements
regarding (lie closure of
abandoned wells
Georgia rules for air quality
control
OSHA-Workcr Protection
N;iti(in;il Archaeological and
Historical Preservation Act
Integrated Risk Information
System (IRIS) Tables
Type
Chemical-Specific
Relevant and
Appropriate
Action-Specific
Applicable
Action-Specific
Applicable
Action-Specific
Applicable
Location-Specific-
Potcnlially
Applicable
Chemical-Specific
To Be Considered
Prerequisites
Property meets soil
concentrations that will
protect the groundwater
aquifers from exceeding these
values based on leaching.
Wells requiring abandonment
may be encountered.
Excavation and Construction.
Excavation and construction.
Should scientific,
prehistorical, historical
artifacts be found at the site,
(his could be applicable.
This could apply to historical
building.
Property meets standards
which ensure risk levels
identified in IRIS are not
exceeded.
Description
Groundwater protection criteria are established that
will protect the groundwater resources.
State requirements for closure of abandoned wells.
State requirements for air quality control
Worker protection requirements.
If actions were to cause irreparable harm. loss, or
destruction of significant artifacts, then recover or
preservation of the artifacts would be required.
IRIS provides health risk information for specific
chemicals.
Citation
40CFR 141
Water Well
Standards Act of
I991.OCGA 12-5-
1 20 el.seq.
GA Rule 391-3-1
29CFR 1910
29CFR 1926
36 CFR 65
1994, Online. EPA
Office of Health
and Environmental
Assessment

-------
          Item
                                  Type
                         Prerequisites
                Description
   •Citation
Health Effects Assessment
Summary Tables (HEAST)
                            Chemical-Specific
                            To Be Considered
                   Property meets standards
                   which ensure risk levels
                   identified in HEAST are not
                   exceeded.
HEAST provides health effects information for
specific chemicals.
1993. EPA Office
of Solid Waste ami
Emergency
Response
Risk Assessment Guidance
for Superfund, Volume  1,
"Standard Default Exposure
Factors"
                             Chemical-Specific
                             To Be Considered
                   Property meets standards
                   which ensure exposure levels
                   identified in guidance are not
                   exceeded.
Exposure factors are provided for use in
developing risk assessments.
March 25, 1991
EPA guidance
document PB91-
921314
Georgia Rules for
Hazardous Site Response,
Chnpier 391-3-19-.07 (Risk
Reduction Standards)
                             Chemical- and
                             Action-Specific
                             To Be Considered
                                                 The Risk Reduction Standards for Hazardous Site
                                                 Cleanups under state law.
                                                Chapter 391-3-19.
                                                Rules of the
                                                Georgia
                                                Department of
                                                Natural Resources
                                                                             The Property Notice requirements for Hazardous
                                                                             Site Cleanups under state law.
Georgia Rules for
Hazardous Response,
Chapter 391 -3-19-.08
(Property Notices)
Action-Specific
To he Considered
                                                Chapter 391-3-19,
                                                Rules of the
                                                Georgia
                                                Department of
                                                Natural Resources

-------
APPENDIX C:
STATE LETTER

-------
                                                          It
                                                                I1CUUICU  I
                                      205 Butler Street. S.E., Suite 1154, Atlanta, Georgia 30334
                                                                      Lontoe C. Barrett. Comntauonv
                                                                      Environmental Protoeflon Division
                                                                          Harold F. RciMte. Director
                                                                                  404/656-7802
                                              September 29, 1995
Mr. Timothy Woolheater
Remedial Project Manager
South Superfund Remedial Branch
USEPA Region IV
345 Courtland Street, NE
Atlanta, Georgia 30365
Dear Mr. Woolheater
                                              Re:  WoolfoUc Chemical Works NPL Site
   Thank you for your letter dated September 28,1995, regarding the draft Record of Decision
(ROD) for Operable Unit Wi (OU2). In the letter you requested EPD concurrence with the ROD.

   We have reviewed the technical data and plans associated with the draft ROD; also, we have
reviewed ATSDR's Health Consultation dated September 28, 1995.  Given the very significant
level of federal expertise involved in development of the draft ROD, EPD is deferring to EPA's
judgment regarding the efficacy of the ROD for OU2.

   Please telephone me at 656-7802 if you have questions.

                                              Sincerely,
                                              Jennifer R. Kaduck
                                              Chief
                                              Hazardous Waste Management Branch
JRK/dm