PB98-963902
                                 EPA 541-R98-010
                                 September 1998
EPA  Superfund
       Record of Decision:
       Osborne Landfill
       Grove City, PA
       12/30/1997

-------
SUPERFUND PROGRAM
RECORD OF DECISION
Osborne Landfill Site
Operable Units, 2, 4 and 5
Mercer County, Pennsylvania
                      DECEMBER 30, 1997

-------
                          TABLE OF CONTENTS

                        PART  I - DECLARATION


I.     SITE NAME AND LOCATION

H.     STATEMENT OF BASIS AND PURPOSE

01.    DESCRIPTION OF THE SELECTED REMEDY

IV    STATUTORY DETERMINATIONS


                     PART II - DECISION SUMMARY

I.     SITE NAME, LOCATION AND DESCRIPTION                             1

H.     SITE HISTORY AND ENFORCEMENT ACTTVmES                         3

m.    HIGHLIGHTS OF COMMUNITY PARTICIPATION                          4

IV    SCOPE AND ROLE OF THE RESPONSE ACTION                           5

V.     SUMMARY OF SITE CHARACTERISTICS                                6

      A. Surface Features                                                  6
      B. Geology                                                       9
      C. Hydrology                                                      10

VI.   NATURE AND EXTENT OF CONTAMINATION                            13

VH.   SUMMARY OF SITE RISKS                                           22

      A. Human Health Risks                                               22
           1. Data Collection and Evaluation                                   22
           2. Exposure Assessment                                         23
           3. Toxicity Assessment                                          24
           4. Human Health Effects                                         25
           5. Risk Characterization                                         29

      B. Ecological Risk Assessment                                          32


     DESCRIPTION OF ALTERNATIVES                                      32

-------
EX. COMPARATIVE EVALUATION OF ALTERNATIVES                             36

      A. Overall Protection Of Human health And Environment                          37
      B. Compliance With Applicable or Relevant and Appropriate Requirements             37
      C. Reduction Of Toxicity, Mobility, or Volume Through Treatment                   39
      D. Implementabihry                                                       39
      E. Short Term Effectiveness                                                 40
      F. Long Term Effectiveness and Permanence                                    40
      G. Cost                                                                 40
      H. State Acceptance                                                       42
      I.  Community Acceptance                                                  42

X. SELECTED  REMEDY AND PERFORMANCE STANDARDS                        42

XI.  STATUTORY DETERMINATIONS                                           45

      A. Overall Protection of Human Health and the Environment                        45
      B. Compliance with Applicable or Relevant and Appropriate Requirements             45
      C. Cost Effectiveness                                                      45
      D. Utilization of Permanent Solutions and Alternative Treatment (or Resources
         Recovery) Technologies to the Maximum Extent Practicable                     46
      E. Preference for Treatment as a Principal Element                               46

XH  DOCUMENTATION OF SIGNIFICANT CHANGES                             46

APPENDIX A -  GROUND WATER FLOW SYSTEMS

APPENDDC B - GLOSSARY OF TERMS

-------
                                    TABLES






Table 1 - Residential Well Depths                                                   17




Table 2 - Eickmann Well Concentrations Over Time                                     17




Table 3 - Slope Factors and Reference Doses for Site Contaminants                          25




Table 4 - Human Health Risks                                                      3 2




Table 5 - Exposure Point Concentrations                                              32




Table 6 • Clarion Aquifer Alternative Costs                                            41




Table 7 - Deep Aquifer Alternative Costs                                             41






                                    FIGURES




Figure 1 - Site Location                                                            2




Figure 2 - Site Map - Pre-Remediation                                                7




Figure 3 - Site Map - Post Remediation                                                8




Figure 4 - Geological Cross Sections                                                 11




Figure 5 - Cross Section of Site Aquifers                                              12




Figure 6 - Vinyl Chloride Concentration Decline                                        15




Figure 7 - Plot of Eickmann Well Results




PART  III - RESPONSIVENESS SUMMARY




      OVERVIEW                                                              4




      BACKGROUND                                                          6




1      RESPONSES TO PUBLIC MEETING COMMENTS                              8




fl.    RESPONSES TO WRITTEN COMMENTS SUBMITTED AT PUBLIC MEETING     23




m    WRITTEN COMMENTS RECEIVED DURING COMMENT PERIOD               24

-------
                            RECORD OF  DECISION
                           OSBORNE LANDFILL SITE
                            Operable Units 2,4 And 5
                            PART I- DECLARATION
SITE NAME AND LOCATION

OSBORNE LANDFILL SITE
PINE TOWNSHIP
MERCER COUNTY, PENNSYLVANIA
STATEMENT OF BASIS AND PURPOSE

      This Record of Decision (ROD) presents the selected remedial action for Operable Unit 2
(wetland sediments), Operable Unit 4 (Clarion Aquifer and Mine Pool) and Operable Unit 5
(Homewood, Connoquenessing and Burgoon Aquifers) at the Osbome Landfill  Site in Mercer
County, Pennsylvania. The selected remedial action was chosen in accordance with the
Comprehensive Environmental Response, Compensation and Liability Act of 1980, as amended,
(CERCLA), 42 U.S.C. §§ 9601 et, seq.: and, to the extent practicable, the National Oil and
Hazardous Substances Pollution Contingency Plan (NCP), 40 CFR Part 300. This decision is
based on the Administrative Record for this Site.

      The Pennsylvania Department of Environmental Protection (PADEP), acting on behalf
of the Commonwealth of Pennsylvania, concurs with the selected remedy.
DESCRIPTION OF THE REMEDY

      The Osborne Landfill Site (Site) was created by the disposal of numerous industrial
wastes into a closed strip mine. The landfill was closed by the PADEP in 1978. The ground
water in the Clarion Aquifer was addressed in the 1990 Record of Decision for the Site, but
during the design phase it was shown that the selected Remedial Action could not be
implemented as described in the ROD. This ROD addresses all Site ground water and the
wetlands to the southwest of the site.  The water in the Clarion Aquifer is contaminated above
Maximum Contaminant Levels (MCL) allowed under the Safe Drinking Water Act, but
contaminant levels are near MCLs, are declining and are expected to reach MCLs within five
years from the issuance of this ROD. Residents on the perimeter of the site have access to a
public water line. All residents on the perimeter of the site near the contaminant plume have
connected to the water line with the exception of the Kring and Parker residences. The ground
water in the Homewood, Connoquenessing and Burgoon Aquifers is not contaminated above
either health based levels or MCLs. The southwest wetlands have not been significantly
impacted by site contaminants.

-------
       The selected Remedies for this Site address the long term threats present at the Osbome
Landfill Site. The selected Remedies include the following components:

D     Natural Attenuation of the Clarion Formation with Continued Ground Water Monitoring

G     Periodic Residential Well Sampling

D     Continued Monitoring of the Homewood, Connoquenessing and Burgoon Aquifers for
       Three Years

D     No Action for the Southwest Wetland Sediments


STATUTORY DETERMINATIONS

       The selected remedy is protective of human health and the environment, complies with
Federal and State requirements that are legally applicable or relevant and appropriate to the
remedial action, and is cost-effective.

       This remedy utilizes permanent solutions and alternative treatment technologies, to the
maximum extent practicable, and satisfies the statutory preference for remedies that employ
treatment that reduces toxicity, mobility, or volume as a principal element.

       Because the selected remedy in the previous ROD for Operable Unit 1 will result in
hazardous substances remaining onsite below the ground water table and above health-based
levels, a review under Section 121 (c) of CERCLA, 42 U.S.C. §962l(c), will be conducted within
five years after  initiation of the Operable Unit 1  remedy to ensure that the selected remedy is
providing protection of human health and the environment.
Abraham Ferdas    j y          /             Date
Acting Director    ^^
Hazardous Site Cleanup Division
Region IE

-------
                                 RECORD OF DECISION

                               OSBORNE LANDFILL SITE

                            PART II  -  DECISION SUMMARY


I.   SITE NAME, LOCATION, AND DESCRIPTION

       The Osbome Landfill Site is located in Pine Township, Mercer County, Pennsylvania.
Located less than one mile east of Grove City, Pennsylvania  In 1989, the fenced area of the Site
encompassed approximately 15 acres along die East Pine Street extension (see Figure 1). Strip
mining was conducted at the Site during the 1940s phor to disposal of wastes in the strip mine
pool. To the north of the Site are woodlands.  Farmland is present to the east (above the strip
mine highwall) and southeast across the East Pine Street Extension. A large shallow offsite pond
is located just west of the Site and is considered to be a federally protected wetland. Another
wetland is situated southwest of the Site on both sides of the East Pine Street Extension. The
immediate Site area is sparsely populated. Most of the residential homes are located along
Enterprise Road, which is approximately 1/4 mile north of the Site, and to the east on Diamond
Road. The closest residence is located about 1,000 feet west of the Site.  Homes along Enterprise
Avenue and Diamond Road previously used ground water, but Cooper Industries extended the
municipal water line around the east side of the Site and connected any resident who was willing
to accept the connection.  Except for Kring and Parker  residents, who refuse to use public water,
residents along the perimeter of the Site, near the plume,  use public  water.

       The basis for concern at the Site was the presence of approximately 233,000 cubic yards
of fill material, which was contaminated with polychlohnated biphenyls (PCBs) (primarily
Aroclor 1254), polynuclear aromatic hydrocarbons (PAHs), metals (lead and chromium), and
several volatile organic compounds (VOCs). The contents of the fill mainly consisted of spent
foundry sand from Cooper Industries, one of the potentially responsible parties (PRPs)
associated with the Site. Solid waste and manufacturing refuse are also present on the surface of
the Site and within the fill material. Fill material was deposited into the strip pool at the base of
the highwall from the late 1950s to 1978, when the Site was closed by PADEP1 for not having a
permit to accept wastes. Dumping of foundry sand and other wastes into the mine pool
eventually created three separate onsite leachate ponds. Materials disposed at the Site include
spent sand; infilco sludge (settled sludge collected from hydroblast equipment); spent carbide (a
byproduct consisting of a lime and water slurry); waste acids from plating and cleaning tanks,
spent Sunoco spirits and solvents. Miscellaneous debris including scrap steel, wood, and metal
chips were also taken to the former disposal area.
       1       This agency was known as the Pennsylvania Department of Environmental Resources (PADER)
prior to July 1995

                                              1

-------
                                                                 FIGURE  1
                                                                        N
REFERENCE: U.S.C.S. 7.5' TOPOGRAPHIC MAP GROVE
CITY QUADRANpLE PENNSYLVANIA. DATED: 1961,
PHOTOREV1SED: 1981, SCALE: r-2000'.
                                           2000
                                       SCALE  IN  FEET
Civil & Environmental Consultants, Inc.
                                       SITE LOCATION
                                   OS80RNE LANDFILL SHE
                            OPERABLE UNTT N0.4 REMEDIAL OESICN
                                   ALTERNATIVES ANALYSIS
OWW. BY: S.METZ
CHKO. BY:
APPROVED BY:
SCALE:
    r-zooo*
DATE:
...I   	
                                                   RGURE  2-1

-------
 II.  SITE HISTORY AND ENFORCEMENT ACTIVITIES

       The Site was investigated by the EPA and the PADEP following its closure as a non-
 permitted landfill. In 1982, the Site was placed on the National Priorities List (NPL). Various
 activities were conducted between 1982 and 1989 by either the PADEP, EPA or Cooper
 Industries; they  are listed below in chronological order:

   •   1983 - Installation of a security fence around the Site and the removal of over 600 drums
              and 45 cubic yards of soil by Cooper Industries.

   •   1983 - Cooper Industries conducted a Remedial Investigation at the Site, in accordance
              with a Consent Order and Agreement between Cooper Industries and the PADEP.

       1985- EPA conducted  an investigation of the disposal area to determine the
              contaminants in  the waste.

   •   1988/1989 - EPA conducted a second Remedial Investigation to assess the nature and
              extent of contamination in all media (ground water, surface water, waste and
              soil/sediments).  A Feasibility Study was conducted which identified alternatives
              for remediating the Site.

       Based on the data obtained from the above investigations and reports, the EPA issued a
Record of Decision (ROD) in 1990 which addressed contamination in the fill, the leachate
associated with the fill and the Clarion Aquifer. The Record of Decision deferred making a
decision on the wetlands to the southwest of the Site, and the Homewood, Connoquenessing and
Bur goon Aquifers until additional studies were performed.  The 1990 Record of Decision
required installation of a slurry wall around the perimeter of the fill area, placement of a clay cap
over the surface of the fill area, and installation of a leachate extraction, treatment and
reinjection system. The treated leachate is injected into the mine voids to the east of the site. The
option to reinject the treated water was influenced by community concerns that removal of water
from the formation could cause subsidence and damage to nearby homes. The remedy for the fill
area has been constructed and is operational.

       The 1990 Record of Decision also selected ground water wells and treatment by air
stripping as the remedial action for the Clarion Aquifer which is the shallowest drinking water
aquifer at the Site. During the design, and after several aquifer pump tests, EPA determined that
remediation of the Clarion Aquifer as required by the 1990 Record of Decision was not possible.
The Clarion aquifer is a thin layer of sandstone above either a coal/clay layer or mine voids.  The
mine voids have produced substantial roof fracturing of the sandstone. Because the aquifer is so
thin and fractured, pumping wells placed in the Clarion formation draw small diameter columns
of water which come primarily from the mine pool, instead of the typically wider capture zone.
To provide overlapping capture  zones in the Clarion Aquifer, an extremely large number of
wells would be needed. Consequently, the number wells needed to remediate the aquifer would
be an order of magnitude or more than the description of the pump and treat system in the 1989

-------
 Feasibility Study.  Additionally water in the mine pool is more contaminated than the Clarion
 Aquifer and pumping wells would draw higher levels of contamination into the Clarion Aquifer.
 At EPA's request, Cooper Industries produced a report titled: Alternatives Analysis and dated
 Apnl 28, 1993.  This Alternatives Analysis report detailed the results of the pump tests and the
 data analysis.  The report also identified potential alternatives to EPA's previously selected
 cleanup approach. Since additional ground water studies were required for the deep aquifers and
•the Homewood Aquifer, EPA made a decision to delay the remedial action until all of the ground
 water studies were completed and the interaction between the aquifers was better understood.
 EPA would then issue a final decision for all Site ground water.

       During the Remedial Investigation conducted in 1988 and 1989, the wetlands to the
 southwest of the Site were investigated. Sampling and analysis of wetland sediments revealed
only very low levels of contaminants, which would not have required remedial action. However,
some biological toxicity tests on fathead minnows and daphnia gave inconsistent results and
needed to be repeated. Additionally, very low levels of PCBs were found in the sediments. EPA
 was  concerned about potential bioaccumulation of PCBs in aquatic organisms and required
additional sediment sampling and testing to make a final decision. The 1990 Record of Decision
deferred a decision on these sediments to a later ROD.

       EPA entered into a Consent Order and Agreement with Cooper Industries on October 10,
 1992, which required Cooper Industries to conduct a Focused Remedial Investigation, Feasibility
Study and Risk Assessment limited to the wetland sediments southwest of the Site and ground
water in the Homewood, Connoquenessing and Burgoon Aquifers. During the Remedial
Investigation, Cooper Industries extended a public water supply water line along Enterprise
Road and Diamond Road in June 1994 to allow residents potentially affected by contaminated
ground water in individual wells east and north of the site to use public water.  The water line
was  extended in response to the detection of concentrations above the MCL of vinyl chloride in
the well at the Eickmann property east of the Site. Cooper Industries completed the Remedial
Investigation and EPA approved the final Focused Remedial Investigation Report on January 26,
1996. Cooper Industries completed the Focused Feasibility Study, which EPA approved on
September 27, 1996.

III.   HIGHLIGHTS  OF  COMMUNITY  PARTICIPATION

       The documents which EPA used to develop, evaluate, and select a remedial alternative
for the Site have been maintained at the Grove City Community Library,  12S West Main Street,
Grove City, PA  16127 and at the EPA Region 3 Office, located at 841 Chestnut Street,
Philadelphia PA 19107.

       The Remedial Investigation/Feasibility Study (RI/FS) and Proposed Plan for die Osbome
Landfill Site were released to the public on August 6,  1997. The notice of availability for these
documents was published in the Sharon Herald and the Allied News on August 6,1997.   An
additional notice of the public meeting was published in the Sharon Herald on August 22, 1997
and in the Allied News on August 20, 1997. A 30-day  public comment period began on August

-------
6, 1997 and  concluded on September 5, 1997.

       A briefing for the Board of County Supervisors, and a public meeting were held during
the public comment period on August 25, 1997. At the public meeting, representatives from
EPA answered questions about the Site and the remedial alternatives under consideration.
Approximately 25 people attended the meeting, including residents from the impacted area, local
government officials, and news media representatives.  EPA subsequently received several
requests to extend the public comment period. EPA published a notice of extension of the public
comment period in the Sharon Herald and Allied News on September 10, 1997, extending the
comment period until October 10, 1997.

       Comments received during the public meeting strongly supported much more extensive
residential well sampling on all sides of the landfill for a longer timeframe than EPA believes
justified. Some comments received also supported substantial additional investigation of site
ground water prior to issuing a Record of Decision for ground water and were critical of EPA's
past remedial investigation work..

IV.  SCOPE AND ROLE OF THE RESPONSE ACTION

       As with many Superfund sites, the problems at the Osborae Landfill Site are complex.
Therefore, the cleanup has been addressed in several phases or Operable Units (OUs). The
Osbome Landfill Site has been divided by EPA into the following five operable units:

       OU-1:  Fill material in strip pit
       OU-2:  Wetland Sediments
       OU-3:  Leachate
       OU-4:  Ground Water in the Clarion Formation
       OU-5:  Ground Water in the Homewood, Connoquenessing, and Burgeon Formations

       EPA selected the following remedies for OU-1, OU-3 and OU-4 in a Record of Decision
issued in September 1990: installation of a slurry wall and a clay cap to contain the contaminants
in the fill material (OU-1); installation of an extraction, treatment, and reinjection system to
address the leachate (OU-3); and extraction of ground water in the Clarion Formation (OU-4)
and treatment by air stripping. The measures to address the fill material and the leachate have
been constructed and are operational at the Site. The OU-4 ground water component is being
revised as part of this ROD.  The primary objective of this Record of Decision is to describe
what is needed to reduce or eliminate potential risks to human health or the environment from
exposure to contaminants associated with wetland sediments (OU-2) and all ground water (OU-4
& OU-5) at the Site. EPA's selected cleanup alternatives address the risk posed by the release
or threat of release of hazardous substances from these operable units. This is the final Record
of Decision for this Site.

-------
 V. SUMMARY OF SITE CHARACTERISTICS

 A. Surface Features

       Pre-Remediation

       The Site includes an abandoned strip mine and associated area that is approximately 15
 acres in area (including the mine spoil piles and highwall areas). The strip pit filled with water
 from surface water runoff and ground water, forming a small lake.  Waste was deposited in the
 pit at die southern end until all of the pit was filled except for three onsite leachate ponds. The
 disposal area was between the spoil piles and the highwall of the pit on the eastern side. Leaking
 drums were stored on the highwall and were removed in 1983. The spoil piles and the highwall
 became overgrown with trees and shrubs.  The actual disposal area was estimated at 6 acres.

       The Site is bordered to the west and the south by a flat low lying wetlands area Between
 the wetland and the actual disposal area are the strip-mine spoil piles. The Pine Street extension
 passes by the southeastern portion of the Site. Agricultural fields are present to the east of the
 Site, and across the Pine Street extension.  The northern border of the Site consists of woods and
 then single homes along Diamond Road.

       The three onsite leachate ponds were located below the highwall. Numerous drum
 carcasses were present along the banks of me onsite leachate ponds and within the leachate
ponds. The surface of the fill was littered with slag, foundry sand boulders, manufacturing
debris (wire, scrap metal, machinery etc.), stoves, refrigerator parts, plastic, empty cans and
drums, etc.

       As discussed previously, a wetland is situated along the western border of the Site, at the
southern end of the site. A large offsite pond, estimated to be approximately 3 acres in size is
located at the northern portion of the wetlands. An intermittent stream drained into leachate
pond #1 onsite (see attached figure 2). A small stream drains the wetlands and runs through a
culvert under the Pine Street extension.

       Current Conditions

       The construction of the Remedial Action for the fill area was completed during the
Summer of 1997. The Site was graded, leachate ponds filled in, a slurry wall installed around
the perimeter of the Site, and a geo-composite impermeable cap and soil cover were completed
(see figure 3). An artificial wetlands was constructed to expand the wetland^ to west of the Site
to replace wetlands damaged by the installation of the cap. The stream which previously drained
into pond #1 was routed around the landfill and empties into the artificial wetlands. A leachate
treatment system consisting of manganese/iron removal with green sand, air stripping and  carbon
adsorption is operational.  The leachate treatment removes contaminants to below safe drinking
water levels and the treated water is injected into the mine pool to the east of the Site. Storm
water runoff from the landfill cap is collected by drainage channels and flows into the stream

-------
         '•.-.r-T --..^-•-•?--.    ••••-  —-^^I^',*-'?' s*"^^^  ',"*"" *•***•   '•'.'•'  .'



         .-." /"^.>'-	. •-J"-.'-:;o -':^V - ••" •' / L •//   :  '/'-?/"'i~~~~*'-'* "
        / V   .'•. woooUNO \ X:vv>'•-••"/'• ^   • — .•'/( .f •' S '.•••"•:-
     .. '"  V\    •   --.  x  ••..  ""i*""'  ^A  v..      ••!!:/•  :' .' , /, .-•'-.
GENERAL  ARRANGEMENT OF THE SITE  AREA

 QSBORNE LANDRLL SITg. GRQVF r.iTV PA

-------
                                                                    FIGURE  3
      '-l	x±i-=r=r-
                   —'
	EASEMENT UNE

——"• SLURRY WALL AUCNMENT
	X	SfTE FENCE ...       _

:•:•••••••••••••:•'•'••••'•:•••••"••••••• MAINTENANCE ROAD

             PERFORMANCE WELL GROUP
                                                            SCALE IN FEET

                                                                 200
                                                              40C
                                                  KUCERA AND ASSOCIATES. INfc.
                                                  JUNE 1891. SCALE: T-100'.
                                                  AERIAL PHOTOGRAPHY DATED APRIL 1991.
      fit Environmental Consultant*, Inc.
     Pittsburgh. PA           Cincinnati.  OH
 412) M1-3400 • (MO) Mfr-U24   (9t3) MB-01H « (800) 7S»-M14
                                    PERFORMANCE  WELLS
                                   OSBORNE LANDRLL SITE
                                    OPERABLE UNIT NO.  1
                               PINE TOWNSHIP.  PENNSYLVANIA
MMi BY* 5.M.M
CHOX
ACAD FUB
  FIGURE1-2
                              1"=200'
DATE
 6/25/97
97135   InttURE 1-2

-------
across the East Pine Street extension. The Site is surrounded be a chain link fence to prevent
public access.

B.  Geology

       Grove City is located in the glaciated portion of the Allegheny Plateau physiographic
province.  Geology beneath the Site includes flat-lying Mississippian- and Pennsylvanian-age
sandstones and shales (see note on figure 4).  The Mississippian-age Burgoon Formation is the
lowest geologic unit evaluated at the Site.  This unit lies approximately 190 feet below the
surface and consists of an upper shaley member and an underlying massive, medium-grained,
sometimes fossiliferous sandstone.

       The Pennsylvanian-age Connoquenessing Formation unconformably overlies (separated
by a period of non-deposition) the Burgoon Formation. It generally includes upper and lower
sandstone units separated by a unit of interbedded sandy shale, coal, and siltstone.  Onsite wells
indicate the formation has a total thickness of 20  to 75 feet.  The lower sandstone is fine- to
medium-grained while the upper sandstone is fine-grained to silty. The intervening shaley unit
is sometimes missing.

       The Mercer Shale is present onsite as a black shaley to sandy siltstone 15 to 40 feet thick.
The thin interbedded limestone lenses regionally  found within this unit were not noted in logs of
onsite wells.

       The Homewood Formation is a micaceous fine- to coarse-grained, generally massive
sandstone, 50 to 75 feet thick. The sandstone exhibits a sucrosic texture and is sometimes thinly
interbedded with shale. The sandstone unit is overlain by zero to 15 feet of siltstone and shale.

       The Clarion Formation is the uppermost  continuous bedrock unit beneath the Site and
vicinity. It is characterized by interbedded sandstone, shale, and coal units.  The lowermost unit
of the Clarion Formation is the Brookville Coal, which is generally several feet thick and is
economically minable. The associated underclay is up to 9 feet thick beneath the Site. The coal
was strip mined at the Site and deep mined in adjacent areas. Overlying the Brookville Coal is a
20- to 50-foot thick series of sandstone and sandy shale, referred to herein as die Clarion
Sandstone. The  Clarion Sandstone is absent west of the Site, and was removed from most of the
Site by strip mining activities. In deep mined areas immediately east of the strip mined area, the
unit is up to 40 feet thick.  It has been identified as a fine to medium-grained micaceous
sandstone with thin interbedded layers of siltstone.  Well logs from site investigations indicate
that deep mining activities have resulted in fracturing of lower portions of the ..Clarion Sandstone.
The Scrubgrass Coal occurs near the top of the formation. This unit is generally less than one
foot thick and is not economically minable.

       The Vanport Limestone - a regional marker bed within the Clarion - is found locally in
isolated patches. The unit was encountered in only one well, MW-9, during site investigations
with a thickness of 3.5 feet. The material encountered was a hard, gray, crystalline, dolomitic

-------
 limestone which became fossiliferous near the base of the unit.

 C.  Hydrology

        The aquifers beneath die Site, exclusive of unconsolidated materials, are the lower
 sandstone and coal of the Clarion Formation, the Homewood Sandstone, the upper and lower
'Connoquenessing Sandstone, and the Burgoon Sandstone (See figure 5). The Clarion is the
 uppermost aquifer and is separated from the Homewood Sandstone Aquifer by the Brookville
 underclay and other siltstones  These fine-grained strata form a thick and generally continuous
 restriction to ground water movement referred to as an aquitard.

        The Brookville Coal and Clarion Sandstone belong to the same aquifer, as no substantial
 aquitard separates these two permeable units. Although a shale is sometimes present over the
 coal, the stratum is thin and discontinuous, and has been intensely fractured by mining activities.
 Hydraulic interaction with the overlying sandstone is complex. Differences in hydraulic head
 between the two units produces vertical hydraulic gradients which likely vary from upward in
 some areas to downward in others and may also vary with time. Roof fracturing of mine rooms
 increases the permeability of the lower portion of the sandstone which increases the magnitude
 of flow between the two units.

        For the purpose of this  ROD, the ground water units adjacent to the site have been
 divided into two groups. The Clarion Aquifer and mine void system will be treated as a single
 unit for the reasons described in the preceding paragraph. The Homewood, Connoquenessing,
 and Burgoon Aquifers will be treated as a single unit since they underlie the base of the landfill
 that is the source of the ground water contamination.

        Ground water flow direction in the overburden aquifer (mine spoil, glacial drift deposits
 and onsite fill materials) is given in figures 3-9 and 3-10 of the 1989 Remedial Investigation
 Report. Ground water flow direction in the Clarion Formation/Mine Void system is towards the
 southeast as shown in figure 3-11 of the 1989 RI Report.  Prior to installation of the slurry wall
 and cap system, ground water flow direction in the Homewood Aquifer appeared to be
 influenced by the onsite leachate ponds, which may recharge the Homewood Aquifer near the
 site. The installation of the slurry wall and clay cap have removed this source of recharge and
 has eliminated this influence. Figures 3-12,3-13 and 3*14 show the ground water flow
 directions that were interpreted in the 1989 report by EPA's contractor (NUS). The ground water
 flow directions in the Burgoon  and Connoquenessing Aquifers are shown in figures 3-17 through
 3-20. In contrast to the shallow aquifers which flow to the southeast, the Burgoon and
 Connoquenessing Aquifers flow to the northwest.  EPA believes that this is at least partially
 caused by the influence of the municipal wells which are to the northwest of the Site.  The
 Mercer Shale aquitard separates the deep aquifers from the shallow aquifers and substantially
 restricts vertical ground water movement between the formations, but was not present on-site.
 For the readers convenience, the figures discussed above are included as appendix A.
                                              10

-------
                                                                 FIGURE  4
                 *o:>VrvlJ-.

                 ,•£>>:•*;.•»•,£

                 i^V*.)*;.--;:?
                 x ;•;-.•>>',»>:
                 •* • V iv.s?.»-»\'-
                 ,• v» *" '» *• •'• %•
                 .=••-•::,'.,>.•••••.•'!>
                 .*•«•-»•• » ». •
                 »•. • •• «k V./.*»«A'
                 .:..V-J#-.••'.'•::•. •
                            OVERBURDEN  (GLACIAL TILL,  FILL), 10-50 FT.




                            DOLOMITIC LIMESTONE. 0-4  FT.



                            SILTY SHALE.  0-20 FT.



                            F1NED-GRAINED  MICACEOUS  SANDSTONE.  10-30 FT.


                            SILTY SANDY  SHALE, 0-5 FT.

                            COAL AND MINE WORKINGS.  2-5 FT.
                            CLAYEY  SILTSTONE TO SILTY SHALE.  0-15  FT.
FINE- TO COARSE-GRAINED SANDSTONE.  50-75  FT.
                             BLACK SHALE. 15-40  FT.






                             FINE-GRAINED, SILTY SANDSTONE. 15-30 FT.


                             SANDY SHALE, COAL, AND SILTSTONE.  0-10 FT.


                             FINE- TO MEDIUM-GRAINED SANDSTONE. 15-35 FT.


                             SILTSTONE TO SANDY SHALE, 15-35 FT.




                             MEDIUM-GRAINED  SANDSTONE. 754100 FT.




                                                     INFORMAL NOMENCLATURE
Chrll & Ba*irrattMit»l Coorataati, Inc.
    ClndrmaU. OH           Pittsburgh. PA
                         «l-340t
                    STRATK3RAPHIC  COLUMN

                    OSBORNE LANOnil SITE

             CURABLE UNIT  N0.4 REMEDIAL DESIGN

                    ALTERNATIVES ANALYSIS

-------
CO
o
ro
O


                                       CONCEPTUAL MOOCL
                                       0880RMC LAMOTILL SITE, MEftCER COUNTY. M
Q
                                                                                                                                tn

-------
VI.  NATURE AND EXTENT OF CONTAMINATION

       The primary objective of the Remedial Investigation was to characterize the nature and
extent of hazardous substances present at the Osbome Landfill Site. As a part of this effort, the
Remedial Investigation Report dated December 29, 1995 (RI) identified and evaluated Site-
related contaminants, their potential migration routes, and exposure pathways for human and
ecological receptors.

A. Clarion Formation

       Monitoring Wells: Seven monitoring wells were installed in the Brookville Coal mine
void and five monitoring wells were installed in the Clarion Aquifer during the Remedial
Investigations performed in the 1980s.  Several organic compounds were detected at low
concentrations in the mine void near the Site. These organic compounds included toluene, vinyl
chloride, cis-l,2-dichloroediene, trans- 1,2-dichloroethene, trichloroethene (TCE), 1,1-
dichloroethene, 1,1 -dichloroethane, and 1,1,1-tnchloroethane. Vinyl chloride was detected in
mine void wells at concentrations as high as 47 micrograms per liter (ug/1) near the highwall
area in one well sampled in 1989.  Vinyl chloride was only detected in one Clarion Aquifer
monitoring well at a concentration of 6  ug/1 during the 1989 Remedial Investigation.
Contamination in the Clarion Aquifer was limited to the area above the highwall of the landfill.

       In 1992 and 1993, further investigations were performed to support the design of the
system to extract and treat ground water from the Clarion Aquifer (OU-4).. These investigations
included installation of additional monitoring wells, the sampling of new and existing wells, and
performing a pump test of die Clarion Aquifer. Samples from the mine void and Clarion Aquifer
monitoring wells were analyzed for VOCs. Vinyl chloride was not detected in any of the Clarion
monitoring wells during the 1995 sampling event. Vinyl chloride was only present in four of the
mine void monitoring wells at concentrations ranging from 2 to 5  ug/1, however, vinyl chloride
was present in the Eickmann residential well at up to 16 ug/1 in the same formation.

       The ground water of the mine void system is contaminated with vinyl chloride above the
Safe Drinking Water Act Maximum Contaminant Limits (MCLs). The MCL for vinyl chloride is
2 ppb.  The presence of vinyl chloride in the mine voids appears to extend just east of monitoring
wells MWV-3, MWV-4 and MWV-5,  located from 700 to 1,200 feet from the landfill. The
exception to this extent of vinyl chloride contamination appears to be the Eickmann residential
well, which is completed in die mine voids and located about 1,700 feet from the landfill. The
higher levels of vinyl chloride detected  in the Eickmann well may be due to a preferential
pathway in the mine voids or some other local source. Although the concentrations in the
Eickmann well have fluctuated during sampling, concentrations over time are decreasing. The
current average concentration appears to be about 4 to 6 ppb based on a regression of all data
obtained through September 1997. Vinyl chloride was not detected in any of the other sixteen
residential wells completed in die Clarion Aquifer or mine voids.  The results from recent
ground water sampling events are shown on Drawing 95414 18-M1 in the Feasibility Study (see
AR306172). This drawing shows both die extent of vinyl chloride contamination and die

                                            13

-------
 concentrations through time

        Recent monitoring has indicated that the vinyl chloride concentrations in the Clarion
 Aquifer have decreased to below laboratory detection limits and concentrations of vinyl chloride
 in the mine void have also decreased from previous high levels. The vinyl chloride
 concentration in monitoring well MWV-2, which has historically been the highest, has decreased
 from 47 ng/1 in 1989 to 5 ^ig/1 in 1995 (See Figure 6). While individual wells samples have
 shown some varying trends over time, the overall trend of vinyl chloride in the mine void is
 downward.

        The piezometric surface of the Clarion Aquifer, east of the Site, at the time of the
 Alternatives Analysis (1993) indicated ground water flow to the southwest and towards the
 landfill with a fairly uniform hydraulic gradient of approximately 0.02 ft/ft. The topography in
 figure 1 also slopes towards the landfill in mis area.  The topography and ground water direction
 then turn toward the southeast at the southern end of the landfill.  The gradient on the
 piezometric surface on the mine void is very low, varying from 0.0008 ft/ft (1993 Alternatives
 Analysis) to 0.001 ft/ft. Water levels obtained in May 1995 for the RI showed the ground water
 in the mine voids moving northeast and southwest from a potentiometnc ridge about 1,000 feet
 northeast of the landfill, which acts as a ground water divide. A relatively small change in head,
 however, could override the ground water divide, allowing ground water to move eastward from
 the landfill. Following precipitation events, the water level in the onsite leachate ponds (which
 are in contact with the coal) have been observed to rise by as much as 10 feet. This ponding of
 water could reverse the ground water flow direction and could cause water to flow  across the
 ground water divide towards the Eickmann residential well. The OU1 remedial action which has
 been implemented at the landfill will prevent this occurrence in the future.

        Generally, the principal method of contaminant transport is advection along the direction
 of ground water flow, with lateral dispersion playing a secondary role. Ground water flow has
 both horizontal and vertical components.  Therefore, vertical hydraulic gradient provides the
.impetus for vertical contaminant transport.  In the case of the landfill, contaminants  could
 migrate from the more highly contaminated mine void into the lesser contaminated Clarion
 Sandstone in areas where an upward hydraulic gradient exists.

        Rates of attenuation were evaluated by time-trend analysis to project vinyl chloride
 concentrations through time.  Historic concentrations at each well were assessed using
 exponential least-squares regression analysis with time as the explanatory variable and
 concentration as the response variable. The results of this analysis are included in Appendix B
 of the Feasibility Study and suggest MCLs will be achieved by attenuation in one to three years.
 Because this analysis is not precise, MCLs are projected to be achieved in three to five years. As
 stated previously, quarterly sampling results obtained in 1997  from the Eickmann  well confirm
 a decline of vinyl chloride as predicted in the Feasibility Study.

        The mine voids create open subsurface pathways for the movement of contaminated
 water.  The ground water flow direction in the mine may fluctuate as-the pond level increases.

                                              14

-------
                                                                            FIGURE  6
    100
f
O
10
                                     Rt Results

                                     Fit 1: &
-------
       This fluctuating ground water flow direction can move contaminated ground water to and
 away from the wells, resulting in fluctuating vinyl chloride concentrations.

       The pump test conducted during the remedial design indicated that the complex
 fracturing of the Clarion Formation and its hydrologic association with the underlying mine
 voids/pool makes extraction and treatment of this ground water problematic. The Clarion
Aquifer is so thin and fractured that extraction wells simply draw a column of water from the
 mine pool below the formation, introducing more contaminated water in the Clarion Formation,
 which is used for drinking water. Additionally, the width of the capture zone during the pump
 test was so small (less than 1 meter in diameter) that an extremely large number of wells would
be needed to capture the contaminant plume in the Clarion Formation. Also, the extraction wells
would draw contaminated mine water above MCLs into the Clarion Aquifer which is currently
 below MCLs.

       One remarkable aspect of the Osbome Landfill Site is virtual absence of the compounds
that that EPA usually finds as "companion" contaminants with vinyl chloride. Vinyl chloride
boils at Tdegrees Farenheit, is a gas at room temperature and is generally only used in the
plastics industry.  All vinyl chloride is manmade or results from the breakdown of other
manmade substances, such as trichloroethylene, tnchJoroethane, and tetrachloroethylene. Most
of the vinyl chloride produced in the United States is used to make potyvinyl chloride (PVC).
Vinyl Chloride was not disposed of at the Osbome Landfill.  One of the most common ground
water problems at Superfund Sites is related to trichloroethylene (TCE) solvent disposal.  TCE
(a degreaser for metals) when disposed in the 1970's or early 1980s, can often still be found at
levels of thousands of parts per billion in ground water. The breakdown products
dichloroethylenes (DCE) are often found at much lower levels and vinyl chloride (VC) at even
lower levels. DCE and Vinyl Chloride are formed by sequential removal of a chlorine atom from
the TCE molecule. The solvent TCE forms a non-aqueous phase which dissolves very slowly
into the ground water and can then degrade to the more harmful chemicals dichloroethylene and
vinyl chloride. Vinyl chloride finally degrades to harmless ethylene gas.  Aquifers contaminated
with large amounts of TCE are very difficult to cleanup, because the TCE generally takes
decades to completely dissolve into the ground water  and the dissolved TCE becomes  a
persistent source of  DCE and VC.  In contrast, it appears that virtually all of the TCE disposed
at the Osbome Site has quickly been degraded to vinyl chloride.

       TCE can be degraded to DCE and VC by several well understood mechanisms. Bacteria
in the subsurface can degrade chlorinated compounds, especially when another energy source
(food) is present to promote bacteria populations.  In the fill area, prior to remediation, soils were
generally very dark and were described as oily by EPA's  contractors. This was due to the past
disposal practices of cutting oils and other oily wastes. This may have promoted bacteria growth
in the subsurface and may have contributed to TCE degradation to VC.  The wastes from Cooper
Industries were derived from foundry operations.  Substantial quantities of iron and steel trash
were disposed of into the landfill. Steel drum carcasses covered the bottom of the onsite leachate
ponds. Researchers at the University of Waterloo discovered that TCE in ground water will
degrade sequentially to DCE, VC and finally ethylene gas in the presence of iron. Iron filings

                                             16

-------
 derived from ground up cars have been used to destroy TCE in a remedial action technology
 know as reactive walls. The iron filings are placed in a trench and when TCE contaminated
 ground water flows through the iron filings, the TCE, DCE and VC are destroyed. The large
 amounts of iron and steel disposed into the landfill may have reacted with TCE disposed at the
 site. Regardless of the mechanism which degraded the TCE and produced VC at the Osbome
 Site, it is clear that substantial degradation occurred, and all that is left is the breakdown product
'from  the original solvent contamination . EPA expects this process  to continue and in
 conjunction with dilution and dispersion to reduce vinyl chloride to the MCL of 2 ppb within
 several years.

       Residential Wells  Seven residential wells were sampled quarterly from September
 1993 through September 1994, and analyzed for low level TCL VOCs. Vinyl chloride was the
 only VOC detected above risk based screening levels, and it was detected only in the Eickmann
 well at concentrations varying from less than 1 to 16 ug/1.  The residential well locations, along
 with vinyl chloride concentrations detected over time, are shown on Drawing 95414.18-M1 of
 the Feasibility Study (see AR 306172). During the initial sampling event, the residents were all
 questioned regarding the depth of their wells. The reported depths are summarized below:

                              Table 1 • Residential Well Depths

       Resident      Depth of Well (ftt            Resident      Depth of Well rftl

       Breese               75                  Kring               48
       Eickmann            60                  Donnelly
       Dunn                50                  Dinniger             72
       Lazor                48

       The Eickman well was the only well which showed contamination at levels of potential
 concern.  The results of this well sampling through time are shown below

                           Table 2 - Eickman Well Concentrations

                     Date          Vinyl Chloride Concentration,  ug/1

                     Sept.  93               16
                     Feb.  94               14
                     May 94               4
                     Sept 94               6
                     May 95               11
                     Feb. 97               10
                     May 97                1,1 (duplicate sample)
                     Aug 97                1,10 (duplicate sample)
                     Sept 97               4, 9 (duplicate sample)
                     Sept 97 (late)          9,4 (duplicate sample)

                                             17

-------
D
a
Q.
L.
0
£
O

X
c
5
                                Eickmann  Well
                                 VC Concentration vs Time
                                                                    98
                                         Year
                        O  Vinyl Chloride, ppb
Regression
I
w
-J

-------
       Based on the reported depths of the wells and estimated depth of the Brookville coal
 seam at each location,  the residential wells appear to be completed in the Clarion Aquifer or
 underlying Brookville coal seam. A new well was drilled at the Eickmann residence in an
 attempt to locate an alternate water supply. The top of the coal seam was encountered at a depth
 of 56 feet, which would indicate the Eickmann well is screened in the coal seam. Because the
 residential wells are completed in the Clarion Aquifer and mine void system, they will be
•addressed as pan of this aquifer.
B.  Homewood Aquifer

       Investigations conducted during the 1980s detected low concentrations of VOCs in water
samples from the Homewood monitoring wells within the fenced landfill area..  Contaminants
include trichloroethene (5.7 ug/1 maximum) and vinyl chloride (1.1 ng/1 maximum).  No
inorganics were detected in these wells. No VOCs or inorganics were detected in water samples
from the Homewood monitoring wells outside of the fenced landfill area,  with the exception of
lead detected at a maximum concentration of 1.6 ug/1.

       Two new and nine existing Homewood monitoring wells were sampled during the
Focused Remedial Investigation subsequently performed by Cooper Industries.  Only very low
levels of acetone, methylene chloride, toluene, TCE, vinyl chloride, bis(2-ethylhexyl)phthalate
and lead were detected in the samples, all at levels well below concern. Acetone and methylene
chloride are suspected laboratory contaminants and bis(2-ethylhexyl)phthalate is a plasticizer
often encountered when plastic sampling  equipment is used.  The only inorganic detected was
lead in only one sample at a concentration of 5.4 ug/1. The action level for lead in drinking
water is 15 ug/1 and the background concentration for lead in the Burgoon Aquifer is estimated
to be about 3 ug/I.

       Only sporadic Site-related VOCs were found above the analytical detection limits in any
of the wells sampled as part of mis subsequent investigation.  Furthermore, none of the VOCs
detected were above MCLs.

C. Connoquenessing and Burgoon Aquifers

       During the investigations conducted in the 1980s, only very low concentrations of TCE
were detected sporadically in the Connoquenessing Aquifer directly below the fill area, while  no
VOCs were detected in Burgoon monitoring wells screened below the Site. Sporadic detections
of pentachlorophenol were found in some of the Burgoon monitoring wells within the fenced
area, but no pentachlorophenol was detected in wells outside of the fenced area  No inorganics
were detected at levels of concern from the Connoquenessing or Burgoon monitoring wells
within the fenced area. Only very low concentrations of one VOC and one SVOC were detected
in Connoquenessing wells outside of the fenced area, and only low concentrations of five VOCs
and one SVOC were detected in a Burgoon monitoring well.  Inorganics were below detection
limits in all of the Burgoon wells outside of the fence, and one very low lead detection was

                                             19

-------
 encountered in one Connoquenessing well outside of the fenced area..

        At the time of the 1990 ROD, Cooper Industries asserted that the vinyl chloride
 detections in the Bur goon Aquifer were due to leakage of contaminated ground water from the
 onsite water table along a well casing. Since detections of contaminants were sporadic and low
 but near MCLs, EPA did not select a remedial action for the Connoquenessing and Burgoon
 aquifers in the 1990 ROD.  Instead EPA required resampling of the Homewood,
 Connoquenessing and Burgoon Aquifer wells which showed contamination in the 1989 RI
 report.  Based on the 1989 NUS report, EPA was also concerned that the Grove City municipal
 wells might be drawing water from beneath the Site to the northwest. EPA required the
 installation of three well nests between the Site and the Grove City wells in the
 Connoquenessing and Burgoon Aquifers to see if contaminants were moving towards the
 municipal wells and to act as a warning system. These wells were at about an equal radius from
 the Site and were spread out to increase the chance of detecting a contaminant plume.

        During the subsequent investigation, VOCs were not detected in the previously installed
 monitoring wells that were sampled. Pentachlorophenol was also not found in any of the
 Burgoon or Connoquenessing samples. Very low concentrations of lead and bis(2-ethylhexyl)
 phthalate were detected at levels below drinking water limits.

        Very low levels of acetone, 2-butanone, 4-m-2-pentanone, toluene, bis(2-ethylhexyl)
 phthalate, and lead were detected in the samples from the new monitoring wells installed as part
of the subsequent investigation. All of the compounds were detected below MCLs.  Again,
acetone, 2-butanone and 4-m-pentanone are suspected laboratory contaminants and bis(2-
ethylhexyl)phthalate is a plasticizer and often encountered when plastic sampling equipment is
used. The maximum toluene concentration (4 ug/1) was well below the MCL (1000 ug/1) and
may not be Site related.   Lead was detected in only one sample (7.7 ug/1) above the probable
background level of 3 ug/1.  This concentration is substantially below the drinking water action
level of 15 ug/1.

        Site-related VOCs such as vinyl chloride were not detected in either the newly installed
or the previously installed monitoring wells. The data indicates that the Connoquenessing and
Burgoon Aquifers are not currently impacted above safe levels. Furthermore, all compounds
detected in the new monitoring wells were below MCLs.
D. Wetlands Sediments

       The 1989 Remedial Investigation collected sediment samples from the wetland area to
the southeast of the landfill and found that the samples contained low levels of PCBs and PAHs.
The presence of these contaminants may have been due to surface runoff from the disposal area.
Sediment samples from the ofrsite pond did not appear to be impacted by the landfill.  Some
bioassay studies were performed during the investigation, however, the results were questionable
because highest mortality occurred in the control samples. Although-the results of chemical

                                             20

-------
 analysis of the sediments showed levels that were not expected to present a problem, EPA
 recommended delaying a decision until the bioassay tests could be repeated and some PCB
 bioaccumulation studies were performed.

       In the subsequent Focused Remedial Investigation, Cooper Industries conducted
 bioaccumulation studies to evaluate whether contaminants were present in the food chain in the
 wetland at the southwest comer of the landfill. These studies did not detect Aroclor 1254 (PCBs)
 in the earthworm samples analyzed.  Additionally, the bioassay studies performed on fathead
 minnow and ceriodaphnia using interstitial water obtained from wetland sediments did not show
 any effects from the Site. Toxicity effects in the bioassay using interstitial water from offsite
 pond sediments were concluded to be not related to the Site, but rather to the strip mine spoil.
 The report on the wetland studies concluded that the low level of contamination in the wetland
 has not had a measurable impact on its environment EPA agrees with the conclusions presented
 in the report and has concluded that no remedial action is warranted for the wetlands studied.
 Additional details on the studies follow:

 NUS Bioassav Testing:  Three sediment samples were collected from the offsite pond in June
 1988 for bioassay testing in order to determine whether the Site contaminants had affected the
 biota in the pond. Elutriates were generated from the sediments  to perform the following tests:
 Fathead minnow (total mortality percentage was measured); Ceriodaphnia (survival percentage
 was measured); and Ceriodaphnia (reproduction rate was measured).

       The first fathead minnow sample indicated mat a 100 percent concentration of elutriate
 (i.e., undiluted) was toxic to the aquatic organisms. The other two samples did not reflect an
expected dose-response relationship. The mortality rate was similar for all elutriate
concentrations in die second sample. The third sample reflected acute toxicity for the 100
percent elutriate dose (the response was 100 percent mortality), but other elutriate concentrations
 were not representative of the expected dose and response.  Ceriodaphnia tests (survival
percentage and reproduction  rate) reflected acute toxicity patterns for all three samples.
Ceriodaphnia reproduction rates also decreased as the concentration of elutriate increased.
However, this decrease was not observed until the 50 percent and 100 percent elutriate
concentrations were applied.

       The study concluded mat because the offsite pond analytical results (i.e., surface water
 and sediment samples) did not display site-associated contaminants, the adverse effects on the
bioassay samples were not attributable to the Site.

       In June 1989, sediment and surface water samples were collected to assess whether
 contaminated sediments detected in the wetland would have an impact on biota.  The same three
tests were conducted as with the initial bioassay testing. The fathead minnow mortality rates
 were inconclusive for the following reasons: control samples (i.e., 0 percent elutriate) reflected
mortality rates ranging from 23 to 92 percent; background surface water and sediment bioassay
samples exhibited higher mortality rates than samples collected from the wetland area which is
contaminated with Arochlor-1254 and PAHs; and there was no linear dose-response relationship

                                              21

-------
 for any of the fathead minnow bioassays. The cenodaphnia results were also inconclusive  No
 linear dose-response relationship was observed for the survival rate of the Cenodaphnia.
 Reproduction rates (number of young produced) for the Cenodaphnia reflected an unusual dose-
 response relationship.

       Analysis of the elutriates did not detect organic or inorganic contamination. No obvious
'laboratory error (low dissolved oxygen, temperature fluctuations, etc.) was noted in the data
 validation.  An explanation as to why the background samples (i.e., those samples collected from
 the influent stream) exhibited greater acute toxicity than samples collected from the wetland was
 not apparent.

       Focused RI/FS Bioaccumulation Study:  Aroclor 1254 was not detected in the earthworm
 composite samples collected from either the reference site or the wetland.

       Focused RI/FS Bioassay Study: The results of bioassays performed on fathead minnow
 and Cenodaphnia using interstitial water obtained from sediments collected from the wetland
 indicate that Site contaminants have not measurably impacted the wetland.  However, the Offsite
 Pond (background) samples displayed toxicity to the fathead minnows and Cenodaphnia. The
 observed toxicity may be attributable to surface runoff from mine spoil piles or mine tailing, and
 has not been shown to be related to Site-associated contaminants.

       Additional details on all studies can be found in the Administrative Record.
VII.   SUMMARY OF SITE RISKS

       Following the Remedial Investigation, analyses were conducted to estimate the human
health and environmental hazards that could result if contamination at the Site is not cleaned up.
These analyses are commonly referred to as risk assessments and identify existing and future
risks that could occur if conditions at the Site do not change. The Baseline Human Health Risk
Assessment ("BLRA") evaluated human health risks and the Ecological Risk Assessment
("ERA") evaluated environmental impacts from.the Site.
A.  Human Health Risks

1. Data Collection and Evaluation

       Data used in the Risk Assessment was collected by Cooper Industries, and because this
was a focused RI/FS, it was subjected to limited data validation by their contractor.  There
already was a body of data available from the 1989 Remedial Investigation that had been
subjected to M3 data validation. To verify that the analytical data from Cooper Industries was of
high quality, EPA had the U.S. Geological Survey split samples with Cooper Industries. The
samples were analyzed by EPA's Central Regional Laboratory, and the data was subjected to M3

                                             22

-------
data validation (highest level of data validation).  This data was compared to the results obtained
from Cooper Industries and the results were consistent.

       Section 2.3 of the Risk Assessment subjected the data screening to limit the risk
assessment calculations to contaminants of concern and eliminating data which did not pass the
screening criteria. For additional details, please see section 2.3 of the Risk Assessment.

       The data collected and described in the previous section (Section VI - Nature and Extent
of Contamination) were evaluated for use in the BLRA.  This evaluation involved reviewing the
quality of the datatto determine which are appropriate to use to quantitatively estimate the risks
associated with Site soil, sediment, surface water, and ground water. The concentrations used to
determine human health risks are derived by averaging the data for each media and then
calculating the upper 95th percentile confidence limit.  By using this upper confidence limit,
EPA can be 95% certain that the true average concentration does not exceed this level.  This
concentration is referred to as the reasonable maximum exposure ("RME") concentration
because an individual would not reasonably  be expected to be exposed to a higher concentration.
The RME values calculated based in the Site data are summarized in Table 4.

2.  Exposure Assessment

       An exposure assessment involves three basic steps: 1) identifying the potentially exposed
populations, both current and future; 2) determining the pathways by which these populations
could be exposed; and 3) quantifying the exposure.  Under current Site conditions, the BLRA
identified the following populations as having the potential for exposure to Site-related
contaminants, either currently and/or in the future:

 •     future residents
 •     current residents

       To EPA's knowledge, no residents are currently using contaminated ground water at the
Site, since the water line was extended around the perimeter of the Site and the Eickmann
residence is using public water. Only one resident close enough to the contaminant plume to be
at risk is using ground water currently and this well has been tested four times and has not
contained Site contaminants. Therefore, only the future use scenario was calculated.
The pathways evaluated were as follows:

              Ingestion of ground water by adults and children;
              Inhalation of VOCs during showering by adults using the Foster
              and Chrostowski Model (1987); and
              Dermal contact with ground water by adults while showering and
              children while bathing.
                                             23

-------
 3. Toxicity Assessment

        The purpose of the toxicity assessment is to weigh available evidence regarding the
 potential for particular contaminants to cause adverse effects in exposed individuals. Where
 possible, the assessment provides a quantitative estimate of the relationship between the extent
 of exposure to a contaminant and the increased likelihood and/or seventy of adverse effects. A
 toxicity assessment for contaminants found at a Superrund Site is generally accomplished in two
 steps:  1) hazard identification, and 2) dose-response assessment. Hazard identification is the
 process of determining whether exposure to an agent can cause an increase in the incidence
 of a particular adverse health effect (e.g., cancer or birth defects) and whether the adverse health
 effect is likely to occur in humans. It involves characterizing the nature and strength of the
 evidence of causation.

       Dose-response evaluation is the process of quantitatively evaluating the toxicity
 information and characterizing the relationship between the dose of the contaminant
 administered or received and the incidence of adverse health effects in the administered
 population.  From this quantitative dose-response relationship, toxicity values (e.g., reference
 doses and slope factors) are derived mat can be used to estimate the incidence or potential for
 adverse effects  as a function of human exposure to the agent. These toxicity values are used in
 the risk characterization step to estimate the likelihood of adverse effects occurring in humans at
 different exposure levels.

       For the purpose of the risk assessment, contaminants were classified into two groups:
potential carcinogens and noncarcinogens. The risks posed by these two types of compounds are
assessed differently because noncarcinogens generally exhibit a threshold dose below which no
adverse effects  occur, while no such threshold has yet been proven to exist for carcinogens.  As
used here, the term carcinogen means any chemical for which mere is sufficient evidence that
exposure may result in continuing uncontrolled cell division (cancer) in humans and/or animals.
Conversely, the term noncarcinogen means any chemical for which the carcinogenic evidence is
negative or insufficient.

       Slope factors have been developed by EPA's Carcinogenic Assessment Group for
estimating excess lifetime cancer risks associated with exposure to potentially carcinogenic
 contaminants of concern.  Slope factors, which are expressed in units  of (mg/kg/day)"1 are
multiplied by the estimated intake of a potential carcinogen, in mg/kg/day, to provide an upper-
bound estimate of the excess lifetime cancer hsk associated with exposure at that intake level.
The term "upper-bound" reflects the conservative estimate of the risks calculated from the slope
factor. Use of this approach makes underestimation of the actual cancer risk highly unlikely.
Slope factors are derived from the results of human epidemiological studies or chronic animal
bioassays to which animal-to-human extrapolation  and uncertainty factors have been applied to
account for the  use of animal data to predict effects on humans. Slope factors used in the
baseline risk assessment are presented in Table 3.

       Reference doses ("RfDs") have been developed by EPA forindicating the potential for

                                              24

-------
adverse health effects from exposure to contaminants of concern exhibiting noncarcinogenic
effects. RfDs, which are expressed in units of mg/kg/day, are estimates of acceptable lifetime
daily exposure levels for humans, including sensitive individuals. Estimated intakes of
contaminants of concern from human epidemiological studies or animal studies to which
uncertainty factors have been applied to account for the use of animal data to predict effects on
humans. Reference doses  used in the baseline risk assessment are presented in Table 3  below.

TABLE 3 - SLOPE FACTORS AND REFERENCE DOSES FOR SITE CONTAMINANTS
Chemical
Benzene
2-Butanonc
1.2-Dichloroet»une
Vinyl Chloride
Weight of
Evidence
ClaatificaU'on
for
Carcinogenicity
A
D
B2
A
CPSo
Oral Slope
Factor
(ing/kg/day)'
2.9E-20)
N/A
9.1E-02(I)
I9(H)
RfdDo
Chronic Oral
Reference DOK
(ing/kg/day)
3.0E-4
(NCEAr-
«.OE-I (I)
0.03 (NCEAH
N/A
CPSi
Inhalation
Slope Factor
(Bg/kg/day)'1
2.9E-02 (I)
N/A
9.1E-02(D
3.0E-01 (H)
RfDi |
Chronic 1
Inhalation
Reference >
DOK j
(mg/Vg/day)
1.71E-3
(NCEA>* |
2.86E-I (I)
2.86E-3
NCEA)+
N/A
Notes: Weight of Evidence Classification for Cucinogenicity:
       A - Human Carcinogen
       B2 - Probable Human Carcinogen
       D  - Not Classifiable as to Human Carcinogenicity (inadequate or no data)
(I) Integrated Risk Information System, Ins
(H) Health Effects Assessment Summary Tables, HEAST
(NCEA) EPA Superfund Technical Support, National Center for Environmental Assessment
N/A Not Applicable
- Supporting information available in risk assessment, appendix E

4. Human Health Effects

       The health effects of the Site contaminants that are most associated with the unacceptable
risk levels are summarized below. In most cases, the information in the summaries is drawn
from the Public Health Statement in the Agency for Toxic Substances and Disease Registry's
(ATSDR) toxicological profile for the chemical.

BENZENE

       Benzene is a colorless liquid with a sweet odor.  Benzene evaporates into air very quickly
and dissolves slightly in water.  Benzene found in the environment is from both human activities
and natural processes. Benzene was first discovered and isolated from coal tar in the 19th
century. Today, benzene is made mostly from petroleum sources.  Benzene is also a natural part
of crude oil, gasoline, and cigarette smoke.
                                              25

-------
 Benzene can enter the body through the lungs when breathing contaminated air. It can also enter
 through the stomach and intestines when eating food or drinking water that contains benzene.
 Benzene can also enter the body through skin contact with benzene-containing products such as
 gasoline. Brief exposure (5 to 10 minutes) to very high levels of benzene in air (10,000 - 20,000
 ppm) can result in death. Lower levels (700 - 3,000 ppm) can cause drowsiness, dizziness, rapid
 heart rate, headaches, tremors, confusion, and unconsciousness.

       Eating or drinking foods containing high levels of benzene can cause vomiting, irritation
 of the stomach, dizziness, sleepiness, convulsions, rapid heart rate, coma, and death.  The health
 effects that may result from eating or drinking foods containing lower levels of benzene are not
 known. Benzene that is spilled on skin may cause redness and sores.  Benzene that enters eyes
 may cause general irritation and cornea damage.

       People who breathe benzene for long periods may experience harmful effects in the
 tissues that form blood cells, especially the bone marrow.  These effects can disrupt normal
 blood production and cause a decrease in important blood components. A decrease in red blood
 cells can lead to anemia.  Reduction in other components in the blood can cause excessive
 bleeding. Excessive exposure to benzene can be harmful to the immune system, increasing the
 chance for infection and perhaps lowering the body's defense against cancer. Benzene can cause
 cancer of the blood-forming organs.

       Exposure to benzene has also been linked with damage to chromosomes.  Exposure to
benzene may also be harmful to the reproductive organs. Studies with pregnant animals showed
that breathing benzene has  harmful effects on the developing fetus. These effects included low
birth weight, delayed bone  formation, and bone marrow damage.

       2-BUTANONE

       2-butanone, also known as methyl ethyl ketone (MEK), is a colorless liquid with a sweet
but sharp odor.   2-butanone can enter the body by breathing air that contains it, through direct
contact with skin, or through consumption of food or water that contains 2-butanone.

       2-butanone can enter the environment in a number of different ways. It can enter the air
or water from the waste of manufacturing plants. 2-butanone is present in many different types
of paints  and glues used both in the home and in industry. As these products dry, 2-butanone
will enter the air. 2-butanone is also released in the exhaust of cars and trucks. Some trees also
release 2-butanone to the air. 2-butanone is found naturally in some foods, and individuals may
also be exposed to 2-butanone by smoking cigarettes.

       The main health effects that have been seen in humans who breathed higher
concentrations of 2-butanone are mild irritation of the nose, throat, eyes, and skin.
       Serious health effects in animals have been seen only at very high concentrations of 2-
butanone. These high concentrations are not expected in the usual use of 2-butanone or in the
vicinity of hazardous waste sites. Studies in animals have shown that 2-butanone does not cause

                                              26

-------
serious damage to the nervous system or the liver, but mice that breathed low levels for a short
rime had temporary behavioral effects. 2-butanone alone does not have serious effects on the
liver or nervous system, but it can cause other chemicals to become more harmful to these
systems.

       Guinea pigs, rats, and mice that breathed high levels of 2-butanone for a short time
became unconscious and died. Pregnant rats and mice that breathed air containing high levels of
2-butanone had underdeveloped fetuses.  The rats that swallowed very high concentrations of 2-
butanone in water also developed signs of nervous system effects such as inactivity, drooping
eye lids, and uncoordinated muscle movement.  Some rats  and mice that swallowed water
containing high concentrations of 2-butanone died. Rats that received water containing a lower
concentration of 2-butanone had mild kidney damage. Skin irritation developed in rabbits and
guinea pigs that had small amounts of 2-butanone placed on their skin. Rabbits that had small
amounts of 2-butanone placed in their eyes had serious eye irritation.  Reproductive effects were
not seen in animals exposed to 2-butanone.
       U-DICHLOROETHANE

       1,2-dichloroethane is a clear, man-made liquid that is not found naturally in the
environment. It evaporates at room temperature and has a pleasant smell and a sweet taste.  1,2-
dichloroethane is used primarily to make vinyl chloride and several solvents that remove grease,
glue, and dirt.  In die past it was also found in trace amounts in solvents that industry used to
clean cloth, remove grease from metal, and to break down oils, fats, waxes, resins, and rubber.

       Humans are exposed to 1,2-dichloroethane primarily by breathing it in air or by drinking
contaminated water. This can happen where the chemical has been disposed of or spilled onto
the ground.  1,2-dichloroethane has also been found in the air near industries where it is made or
used in manufacturing.  Humans can also be exposed to low levels of 1,2-dichloroethane in the
home by using old products formerly made with 1,2-dichloroethane, such as cleaning  agents,
pesticides, and glued wallpaper and carpet. These levels are reportedly not high enough to cause
significant adverse health effects.

       1,2-dichloroethane can enter the body when people breathe contaminated air or drink
contaminated water. Studies in animals also show that 1,2-dichloroethane can enter the body
through the skin. Humans are most likely to be exposed by using contaminated water containing
1,2-dichloroethane  or by breathing 1,2-dichloroethane that escapes from contaminated water
and soil into the air.

       1,2-dichloroethane can cause cancer when large doses are eaten by  laboratory animals,
and tumors of the lung when put on the skin of laboratory animals. Provided that humans
reacted the same way as animals, people who eat or drink high concentrations of 1,2-
dichloroethane for a lifetime might also develop cancer.  People who have had their skin exposed
to high levels of 1,2-dichloroethane for a long time may develop benign tumors. Inhalation of

                                              27

-------
 1,2-dichloroethane may also possibly cause cancer. The likelihood of this happening increases
 with increasing exposure to 1,2-dichloroethane as well as other carcinogens, and depends on
 how susceptible an individual is to this chemical.

        People who were accidentally exposed to large amounts of 1,2-dichloroethane in air or
 who accidentally or intentionally swallowed 1,2-dichloroethane have developed heart, lung, and

-------
        Studies in animals show that extremely high levels of vinyl chloride can damage the
liver, lungs, and kidneys.  These levels can also damage the heart and prevent blood clotting
The effects of drinking high levels of vinyl chloride are unknown. If liquid vinyl chloride is
spilled on the skin, it will numb the skin and cause redness and blisters.  This would likely be
due to the rapid evaporation that can cause localized frostbite.

        Some people who have breathed vinyl chloride over several years have developed
changes in their liver structure. The likelihood of developing these changes increases with
breathing higher levels of vinyl chloride. Some people who have worked with vinyl chloride
have developed nerve  damage, and others have developed an immune reaction.  The lowest
levels that cause liver changes, nerve damage, and the immune reaction in humans are not
known.  Certain jobs related to polyvinyl chloride production exposes workers to very high
levels of vinyl chloride. Some of these workers have problems with the blood flow in their
hands. In some of these people, changes have appeared on the skin of their hands and forearms.
Also, bones at the tips of their fingers have broken down. Studies suggest that some people may
be more sensitive to these effects than others.

        Some men who work with vinyl chloride have complained of a lack of sex drive. Results
of studies in animals show that long-term exposure may damage die sperm and testes. Some
women who work with vinyl chloride have had irregular menstrual periods.  Some have
developed high blood pressure during pregnancy.  Studies of women who live near vinyl
chloride manufacturing plants could not prove that vinyl chloride causes birth defects. Studies
using pregnant animals show that breaming vinyl chloride may harm their unborn offspring.
Animal  studies also show mat vinyl chloride may cause increased numbers of miscarriages early
in pregnancy. It also causes decreased weight and delayed skeletal development in fetuses. The
same very high levels of vinyl chloride that caused these fetal effects also caused adverse effects
in the pregnant animals.

        Results from several studies suggest that breathing air or drinking water containing low
levels of vinyl chloride may increase the risk of getting cancer. Studies of workers who have
breamed vinyl chloride over many years showed cancer of the liver. Brain cancer, lung cancer,
and some cancers of the blood also may be connected with breaming it daily for several years.
Studies  of long-term exposure in animals show that increases in cancer of the liver and
mammary gland may occur at very low levels of vinyl chloride in the air. Studies show that
animals fed low levels of each day during their lifetime had an increased risk of getting liver
cancer.

5. Risk Characterization

        The risk characterization process integrates the toxicity and exposure assessments into a
quantitative expression of risk. For carcinogens, the exposure point concentrations and exposure
factors discussed earlier are mathematically combined to generate a chronic daily intake value
that is averaged over a lifetime (i.e., 70 years).  This intake value is then multiplied by the
toxicity value for the contaminant (i.e., the slope factor) to generate the incremental probability

                                              29

-------
 of an individual developing cancer over a lifetime as a result of exposure to the contaminant.
 The National Oil and Hazardous Substances Pollution Contingency Plan ("NCP") established
 acceptable levels of carcinogenic risk for Superfund sites ranging from one excess cancer case
 per 10,000 people exposed to one excess cancer case per one million people exposed.  This
 translates to a nsk range of between one in 10,000 and one in one million additional cancer
 cases.  Expressed as scientific notation, this risk range is between 1 .OE-04 and 1 .OE-06.
/Remedial action is warranted at a site when the calculated cancer risk level exceeds 1 .OE-04.
 However, since EPA's cleanup goal is generally to reduce the risk to 1 .OE-06 or less, EPA also
 may take action where the nsk is within the range between 1 .OE-04 and 1 .OE-06.

       The  potential for noncarcinogenic effects is evaluated by comparing an exposure level
 over a specified time period (i.e., the chronic daily intake) with the toxicity of the contaminant
 for a similar time period (i.e., the reference dose).  The ratio of exposure to toxicity is called a
 hazard quotient.  A Hazard Index ("HP') is generated by adding the appropriate hazard quotients
 for contaminants to which a given population may reasonably be exposed. The NCP also states
 that sites should not pose a health threat due to a non-carcinogenic, but otherwise hazardous,
 chemical. If the HI exceeds one (1.0), mere may be concern for the potential non-carcinogenic
 health effects associated with exposure to the chemicals. The HI identifies the potential for the
 most sensitive individuals to be adversely affected by the noncarcinogenic effects of chemicals.
 As a rule, the greater the value of the HI above 1.0, the greater the level of concern.
Risks from Clarion Aquifer and Mine Void System

       The current land use immediately surrounding the property is residential and agricultural.
The only current domestic ground water use near the Site is the Kring residential well.  Site-
related contaminants analyzed for in samples from the Kring well have been below method
detection limits. The other six downgradient residences near the Site (Breese, Dinninger,
Donnelly, Dunn, Eickmann and Lazor) are on a public water supply.  Because no Site-related
contaminants were identified in the Kring well, which is nearer to the Site than the other wells,
current ground water use was not considered to be of concern and was not further considered in
the risk assessment. The BLRA did evaluate the potential risk to future residents who could use
ground water from the Clarion Aquifer and Mine Void System.  Although future residents in the
area would likely use the public water supply, this approach provides a conservative estimate of
potential Site risk. These risks are presented in Table 4 below.

       The ground water contamination at the Site appears to be located in the mine pool
underlying the Clarion Aquifer. During the Remedial Investigation conducted in 1989, only one
well in the Clarion Aquifer was contaminated (at 6 ng/1), while many of the wells in the mine
pool showed  at higher levels (up to 47 ng/1). During the most recent sampling conducted in
1995 as part of the subsequent Focused Remedial Investigation, wells in the Clarion Aquifer did
not show  contamination except for the Eickmann residential well. The BLRA estimates that
potential cancer risk to future residents using the Clarion Aquifer and Mine Void System to be
2. IE-OS for children and 4.6E-OS for adults, both within the acceptable range of 1.OE-04 to 1 .OE-

                                             30

-------
06. Similarly, the potential non-carcinogenic risks for both children (HI = 0.24) and
adults (HI = 0.13)are below the acceptable level (HI=1.0).  Although some mine pool wells
continue to contain at levels above the MCL of 2 ug/1, the levels have been declining.  For
example, the monitoring well which had the  highest concentration (47 ug/1) showed a decrease
to 5 ug/1 in the 1993 sampling.  The only contaminated residential well (Eickman well) showed a
decline from a high of 16 ug/1 to an average  of about 5 ug/1 in recent sampling. The risk
-assessment used 16 ug/1 the maximum concentration found in the Eickmann well.

       Because elevated concentrations of vinyl chloride were detected in an existing residential
well (the Eickmann well), the BLRA also considered the scenario whereby a future resident
would use this well for drinking water. While this scenario is unlikely since public water is
available, it presents a worst-case estimate of potential risk.  The cancer risk to future residents
using ground water of the quality found in the Eickmann well would be 1.7E-04 for children and
3.7E-04 for adults, both exceeding EPA's acceptable range. As discussed earlier, the Clarion
Aquifer is very fractured and the Eickman well, which is the closest to the fill material, extends
to just above the mine pool. This well appears to draw water from the mine pool resulting in an
elevated level of a maximum of 16 ug/1.  This residence has been connected to public water
eliminating the current direct risk from contaminated ground water in this well.

Risks from Homewood,  Connoquenessing and Burgeon Aquifers

       During the 1989 Remedial Investigation, TCE was present (5.8 ug/l maximum;  0.4 ug/1
mean) in the Homewood Aquifer. The maximum TCE level is slightly above the MCL (5 ppb),
and was detected below the MCL. During the recent sampling events, no Site-related
contaminants were found above MCLs in the Homewood Aquifer. Some very low levels of
VOCs were detected at levels substantially below the MCLs. The contaminants butanone,
pentanone, toluene and bis(2-ethylhexyl)phthalates are suspected lab contaminants. Comparison
to Site contaminants to those found in the previous  remedial investigation indicates that these
VOCs are not Site-related.

       Low levels of contamination (at or below the MCL) were found sporadically in a very
small number of well samples taken from the the Connoquenessing and Burgoon Aquifers
during the 1989 Remedial Investigation.  During recent sampling events, wells in these
formations showed only trace levels of VOCs all well below the MCLs.  The potential risk to
future residents  using ground water from these aquifers is presented in Table 4.  The estimated
cancer risks are  S.4E-06 and 1.2E-05 to children and adults, respectively. These risk levels are
within EPA's acceptable risk range.
                                             31

-------
                                          Table 4
                                    Human Health Risks
1
Group of Individuals
Future residents using the Clarion Aquifer
or ground water from die mine voids
Future resident using the Homewood,
Connoquenessing and Burgoon Aquifers
Hazard Index
Child
0.24
N/A
Adult
0.13
N/A
Cancer Risk
Child
2.1E-05
5.4E-06
Adult
4.6E-05
1.2E-05
Note: Cancer risks in the above table are based on the exposure point concentrations shown
below and the statistical methods shown in this table.These represent RME or maximum risks
(see table 5 below). Cancer risks based on Central Tendency calculations are lower as shown in
table 6-6 of the Risk Assessment which compares upper bound cancer risks to those calculated
using the central tendency statistical method.

                          Table 5 - Exposure Point Concentrations
VARIABLE
Ccimntratto* to Grwn4 Waitr, (pfl)
Clarion Aquifer AMtot V«ld
Benzene
1,2-Dichloroethane
Vinyl Chloride

Vinyl Chloride
EJcloBiui RciMtfrtfal WtU
Vinyl Chloride
RANGE

-------
 technologies remaining after the screening process were then developed into the following
 remedial alternatives.

 CLARION FORMATION ALTERNATIVES

 Alternative CM-1 • No Action:

 Capital Cost:                        $0
 Total Present Worth Cost:            $0
 O&M Annual Cost:                 $0
 Time to Implement (years):            0
 Est. Years  to Achieve MCLs           5

       The no-action alternative is considered as a baseline for comparison with other
 alternatives. Section 300.430(e)(6) of the NCP requires that EPA consider a "No Action"
 alternative for every Superfund Site to establish a baseline or reference point against which each
 of the remedial action alternatives are compared. In the event mat the other identified
 alternatives do not offer substantial benefits in the reduction of toxiciry, mobility, or volume of
 the constituents of concern, the No Action alternative may be considered a feasible approach.
 This alternative leaves the Site undisturbed and all current and potential future risks would
 remain. Under this alternative, the Clarion Aquifer and mine void system would not be actively
 remediated or monitored.
Alternative CM-2 - Natural Attenuation with Monitoring:

Capital Cost:                        $37,000
Total Present Worth Cost:            $348,700
O&M Annual Cost:                 $38,300
Time to Implement (years):            0
Est. Years to Achieve MCLs           5

       This alternative includes sampling existing monitoring wells and one new monitoring
well to track the continuing natural attenuation of vinyl chloride in the ground water.
Monitoring of the Clarion Aquifer and mine void system has shown the contaminant
concentrations have been decreasing with time, and would likely achieve MCLs without active
remediation.

       Ground water monitoring would consist of sampling four wells in the mine void on a
quarterly basis (MWV-4, MWV-6, MWV-7 and MWV-8).  Six wells in the Clarion Aquifer
would be monitored semi-annually (MWC-2, MWC-3, MWC-4, MW-7, MW-8, and MW-9).
Nine wells in the mine void system would be monitored semi-annually (MWV-1 through MWV-
8).  One new monitoring well (MWV-9) would be installed in the mine voids to supplement the
existing network.  The wells sampled would be located at the boundary of the plume and within

                                            33

-------
the plume to monitor both migration and attenuation of the contamination. In addition, two
residential wells (the Kring and Parker wells), would be monitored quarterly. These residential
wells would be monitored in addition to the two residential wells (Eickmann and Dunn) being
monitored as part of the OUl remedial action. At the time of the FS, the Breese well was
included in this alternative, but this residence has connected to the water line and the well has
been closed. The ground water samples will be analyzed for low level TCL VOCs by EPA
method 524.2, with results summarized in annual reports. Monitoring will continue for five
years after MCLs are reached.

        In additiortto the wells discussed above, 12 performance monitoring wells located on the
perimeter of the landfill in both the Homewood and Clarion Aquifers, and two additional
residential wells would be monitored as part of the OUl Remedial Action.  The wells would be
sampled semi-annually and analyzed for TCL volatile and semi-volatile organic compounds and
TAL metals to assure that the landfill is not releasing contaminants into the aquifer.
Alternative CM-3 - In-Situ Biodegradation of Mine Void:

Capital Cost:                        $1,359,000
Total Present Worth Cost:            $1,830,000
O&M Annual Cost:                 $ 117,000
Time to Implement (years):            2
Est. Years to Achieve MCLs          4

       This alternative involves the injection of nutrients and oxygen into the mine void to
stimulate biological activity that would consume contaminants. A ground water extraction and
reinfection system would be installed to circulate the water in the mine void to distribute the
nutrients and oxygen over an area of about 29 acres. This alternative would not include the
injection of nutrients and oxygen into the Clarion Aquifer because the transmissivity of the
sandstone prevents circulation and delivery of oxygen and nutrients. Any residual contaminants
detected in the Clarion Aquifer would be allowed to disperse naturally.  Ground water
monitoring would be performed during the treatment program to monitor progress of
remediation and would continue for five years following completion of remedial action.

Alternative CM-4 • Air Sparging:

Capital Cost:                        $1,362,000
Total Present Worth Cost:            $1,910,000
O&M Annual Cost:                 $73,400
Time to Implement (years):            2
Est. Years to Achieve MCLs          4

       Air sparging involves in-situ stripping of VOCs from contaminated water.  Injection and
circulation wells would be installed in the mine void to inject air into the water and circulate it

                                             34

-------
through the voids. Additionally, a trench-type vapor-extraction system would be installed in the
farm fields to the north and east of the Site to remove VOCs transported to the unsaturated zone
above the water table by the sparging. The off-gases from the vapor-extraction system would be
passed through activated carbon to control VOC emissions.  Ground water monitoring would be
performed during the treatment program to monitor progress of remediation and would continue
for five years following completion of remedial action.

Alternative CM-5 - Ground Water Extraction from the Mine Voids, Treatment, and
Reinjection to the Mine:

Capital Cost:                      $854,000
Total Present Worth Cost:           $1,349,000
O&M Annual Cost:               , $119,500
Time to Implement (years):            2
Est. Years to Achieve MCLs         4

       Wells would be installed within the mine void to extract water which would be treated by
air stripping to remove VOCs.  The off-gases from the air stripper would be passed through
activated carbon to remove VOCs prior to release to the atmosphere. Treated water would be
reinjected into the mine void using the OU1 Injection Wells at the perimeter of die contaminant
plume to induce water circulation within the  area of concern and to establish a gradient inward
toward the extraction wells. One additional injection well would need to be installed.
Monitoring of the mine void water and Clarion Aquifer would continue for five years following
completion of this action.

       HOMEWOOD, CONNOQUENESSING AND BURGOON AQUIFER
       ALTERNATIVES

Alternative HCB1 - No Action:

Capital Cost:                       $0
Total Present Worth Cost:           $0
O&M Annual Cost:                $0
Time to Implement (years):            0

       The no-action alternative is considered as a baseline to compare with other alternatives.
For this alternative, the aquifers would not be actively remediated or monitored.

Alternative HCB2 - Natural Attenuation  with Monitoring:

Capital Cost.                       $0
Total Present Worth Cost:           $82,600
O&M Annual Cost:                $22,800
Time to Implement (years):            0

                                            35

-------
       This alternative includes monitoring of existing wells in the Connoquenessing (CW-1,
CW-2, and CW-3), and Burgoon (BW-1, BW-2, and BW-3), Aquifers to verify contamination is
not migrating from the Site toward community wells. This alternative will be implemented after
source containment (OU1 remedial action).  Monitoring of water quality would be performed
using the EPA analytical method  524.2 for TCL volatiles.  Ground water monitoring will consist
of sampling three wells in the Connoquenessing Aquifer and three wells in the Burgoon Aquifer
for three years after issuance of this ROD on a semi-annual basis to confirm past monitoring
results. The samples will be analyzed for low level TCL VOCs with results summarized in
annual reports.

       WETLAND SEDIMENTS

       Since the wetland sediments did not contain significant contamination, no alternatives
were evaluated.
IX.  COMPARATIVE EVALUATION OF ALTERNATIVES

       Each of the the remedial alternatives summarized in this ROD has been evaluated against
the nine (9) evaluation criteria set forth in the NCP, 40 C.F.R. Section 300.430(e)(9).  These nine
criteria can be categorized into three groups: threshold criteria, primary balancing criteria, and
modifying criteria  A description of the evaluation criteria is presented below:

Threshold Criteria:

  1.    Overall Protection of Human Health and the Environment addresses whether a remedy
       provides adequate protection and describes how risks are eliminated, reduced, or
       controlled.

  2.    Compliance with Applicable or Relevant and Appropriate Requirements (ARARs)
       addresses whether a remedy will meet all of the applicable, or relevant and appropriate
       requirements of environmental statutes.

Primary Balancing Criteria:

  3.    Long-term Effectiveness refers to the ability of a remedy to maintain reliable protection
       of human health and the environment over time once cleanup goals are achieved.

  4.    Reduction ofToxicity, Mobility, or Volume through Treatment addresses the degree to
       which alternatives employ recycling or treatment mat reduces toxicity, mobility, or
       volume of contaminants.

  5.    Short-term Effectiveness addresses the period of time needed to achieve protection and
       any adverse impacts on human health and environment that may be posed during the

                                           36

-------
        construction and implementation pehod until cleanup goals are achieved.

  6.    Implementability addresses the technical and administrative feasibility of a remedy,
        including the availability of materials and services needed to implement a particular
        option.

  7.    Cost includes estimated capital, operation and maintenance costs, and present worth
        costs.
Modifying Criteria:

  8.    State Acceptance indicates whether, based on its review of backup documents and the
       Proposed Plan, the State concurs with, opposes, or has no comment on the preferred
       alternative.

  9.    Community Acceptance includes assessments of issues and concerns the public may have
       regarding each alternative based on a review of public comments received on the
       Administrative Record and the Proposed Plan.
A.  Overall Protection of Human Health and the Environment

       All of the alternatives are protective of human health in the short term because to EPA's
knowledge, there are no residents using contaminated ground water.  The Grove City water line
was extended around the perimeter of the Site by Cooper Industries, and no action is needed to
reduce current risks. All of the alternatives, except No Action, would be protective in the long
term, since wells would be monitored, and MCLs would be achieved within several years.
Additionally, institutional controls on the use of ground water on the lot containing the plume
were required by the first ROD for the fill area  It is  possible that by the time treatment
alternatives were constructed at great expense, ground water contamination might already be
below MCLs or even detection levels. Additionally, the complex nature of the mine pool would
pose a substantial challenge to successful remediation.

       Alternative HCBI is not protective because it would not require continued monitoring of
these aquifers which feed die Grove City municipal wells. HCB2 is protective because it would
require monitoring. Monitoring is necessary because contaminants are present at very low levels.

B.  Compliance with Applicable or Relevant and Appropriate Requirements (ARARS)2
       * Under Section 121(d) of CERCLA, 42 U S.C. § 9621 (d), and EPA guidance, remedial actions at
CERCLA sites must attain legally applicable or relevant and appropriate federal and promulgated state
environmental standards, requirements, criteria and limitations which are collectively referred to as "ARARs", unless
such ARARs are waived under Section 121(d)(4) of CERCLA, 42 U.S.C. § 9621(d)(4).

                                              37

-------
       Any cleanup alternative considered by EPA must comply with all applicable or relevant
 and appropriate federal and state environmental requirements.  Applicable requirements are those
 substantive environmental standards, requirements, catena, or limitations promulgated under
 federal or state law that are-legally applicable to the remedial action to be implemented at the
 Site. Relevant and appropriate requirements, while not being directly applicable, address
 problems or situations sufficiently similar to those encountered at the Site that their use is well-
'suited to the particular site.

       The following Chemical Specific ARAR is relevant and appropriate. Both the federal and
 state Safe Drinking Water Acts set minimum standards called Maximum Contaminant Levels
 (MCLs) for drinking water supplied by municipal wells. These MCLs are enforceable federal
 standards. In addition, EPA attempts to achieve if possible, non-zero Maximum Contaminant
 Level Goals (MCLGs). These goals are usually lower levels than MCLs.

       The Clarion/Mine void, Homewood, Connoquenessing and Burgoon Aquifers are
 considered  Class n aquifers and as such, non-zero MCLs and MCLGs are ARARs. Neither the
non-zero MCLGs and MCLs are exceeded in the Homewood, Connoquenessing, or Burgoon
 Aquifers; However both are exceed in the Clarion Aquifer/Mine Void formation. The No Action
 alternative would not comply with the state standards as set forth in (25 PA Code, Chapter 109
Subchapter B) Or the federal standards (40 C.F.R. Part 141.61).  All other alternatives would
comply with this ARAR, since MCLs/Non-zero MCLGs would be achieved in a relatively short
time frame.

       PADEP has identified Act n as as an ARAR for this remedy; EPA has determined that
Act n does not, on the facts and circumstances of this remedy, impose any requirements more
stringent than the federal standard.

       None of the alternatives would discharge water from the site and therefore there are no
discharge ARARs.

       The following action specific ARAR is applicable for Alteratives CM-4 and CM-S.
Alternatives CM-4 and CM-S would have air emissions from a carbon adsorption system which
would comply with the requirements set forth in 25 PA Code Section 127.12(a)(5), which
requires that emissions be reduced to a minimum through Best Available Technology as defined
in 25 PA Code Section 121.1. These alternatives would also comply with RCRA requirements
of Subpart AA (Air Emission Standards for Process Vents) of the Federal RCRA regulations, 40
C.F.R. 264.1032 are relevant and appropriate for the air emissions control units used by CM-4
and CM-5.  Under this ARAR, total organic emissions from the carbon adsorbers must be less
than 1.4 kg/hr (3 Ib per hour) and 2800 kg/yr (3.1 tons per year). These alternatives would also
comply with the TBC OSWER Directive 9355.0-28 which requires control of hydrocarbon
emissions in excess of 15 pounds per day in ozone non-attainment areas.

       The following action specific ARAR is applicable for Alternatives CM-4 and CM-5.
Alternatives CM-4 and CM-5 would produce treatment residuals (spent carbon) that must be

                                            38

-------
 managed as a RCRA hazardous waste. A scoping estimate of the amount of carbon disposed is
 about four tons per year. These residuals must be managed in compliance with the applicable
 sections of the PA Solid Waste Management Act, 35 P.S. Sections 6018.101 through 6018.1003,
 which follow: 25 PA CodeJ>art 262 Subparts A (relating to hazardous waste determination and
 identification numbers), B (relating to manifesting requirements for off-site shipments of spent
 carbon and other hazardous wastes), C (relating to pre-transportation of hazardous waste
•requirements), and with respect to operations at the Site generally, with the substantive
 requirements of 25 PA Code 264  Subparts B-D, I (in the event that hazardous waste generated as
 part of the remedy is managed in containers), J (in the event that hazardous waste is managed,
 treated or stored in tanks). These alternatives will also comply with the RCRA Land Disposal
 Restrictions set forth at 40 C.F.R. Part 268.1 to 268.5 related to the management of hazardous
 wastes (including spent carbon) generated as part of the remedial action.

        The following action specific ARARs are relevant and appropriate for all alternatives
 except No Action. All of the alternatives evaluated except the No Action alternatives will
 comply with 25 PA Code chapter 107 if wells are installed. Alternatives which require
 reinjection of treated water will meet the requirements of Class IV injection wells under the Safe
 Drinking Water Act as set forth in C.F.R.  144.13 (c) (provisions related to CERCLA cleanups)
 and C.F.R. 144.23(bXl) (injection well closure requirements).

 C. Reduction of Toxicity, Mobility, or Volume through Treatment

        Alternatives CM1, CM2,  CM4 and CM5 will not reduce the toxicity mobility or volume
 of vinyl chloride by treatment. CM3 would reduce the toxicity of the vinyl chloride, however the
 concentration levels are already low and declining.

        Alternatives HCB1 and HCB2 will not reduce the toxicity, mobility or volume of ground
 water contaminants, however all contaminants were well below safe levels.
D.  Implementability

       This evaluation criterion addresses the difficulties and unknowns associated with
implementing the cleanup technologies associated with each alternative, including the ability and
time necessary to obtain required permits and approvals, the availability of services and
materials, and the reliability and effectiveness of monitoring.

       Alternative CM2 is easily implemented because it only includes monitoring. Alternatives
CM3 through CM5 can easily be constructed using established technologies ^The ability of
Alternatives CM3 and CM4 to achieve cleanup levels much sooner than natural attenuation  is
questionable. Air sparging would be difficult to effectively implement because the mine tunnels
and collapsed mines would produce a very non-uniform delivery of air to the mine pool and the
pore water of the Clarion sandstone.  Some areas might be cleaned up quickly while other large
areas might only progress toward MCLs through natural attenuation.  Delivery of nutrients and

                                             39

-------
oxygen to all areas of the mine pool and die Clarion sandstone would pose similar problems.

       Both alternatives HCB1 and HCB2 can be easily implemented.

E.  Short-Term Effectiveness

       If a new residential well were installed and used in die property above the plume, the
users could be exposed to contaminants above MCLs. However, except for the Eickmann
property, the plume is confined to the property of the current Site owner, who is a respondent to
a Unilateral Order issued under the first ROD for OU1 which prohibits placement of new
residential wells within one half mile of the site. Another short-term risk associated with the
Clarion Formation alternatives is the potential risk associated with air discharges of vinyl
chloride during air sparging under CM-4  This risk would be mitigated by the use of off-gas
treatment such as carbon.  Alternatives CM3 through CMS would impact fanning because wells
or trenches must be installed in the field for construction of these alternatives.  Alternative CM2
could begin upon approval by EPA and installation of one monitoring well, providing additional
confidence mat concentrations have declined. Alternatives CM3 through CMS will require
approximately one year to design and Alternatives CM3 and CM4 would require a pilot study.

       The Homewood, Connoquenessing and Burgoon Alternative HCB-2 has good short term
effectiveness because  existing monitoring wells could be used to quickly verify that
contaminants are below MCLs. Alternative HCB1 would not be effective in the short term since
no monitoring would be conducted.

F. Long-term  Effectiveness and Permanence

       With all the alternatives, future use of the Clarion Aquifer or mine void system within the
plume prior to achieving MCLs would result in health risks. However, with the presence of the
water line and the decline of contaminants, the risk is very low. MCLs are based on a 30 year
exposure time and EPA expects contaminant levels to reach MCLs within five years. Once
cleanup levels are reached there should be no unacceptable residual risks. All alternatives
include monitoring after cleanup  levels are reached to insure levels remain below cleanup levels.

       The contaminant levels in the Homewood, Connoquenessing and Burgoon Aquifers are
within safe levels. Alternative HCB2 requires ground water monitoring which will assure that
contaminants remain below safe levels for several years, after which monitoring may be
discontinued. Alternative HCB 1 is not considered to have good long term effectiveness because
it would not verify that ground water contamination is not present over die next several years.

G.  Cost

       Evaluation of costs of each alternative generally includes die calculation of direct and
indirect capital costs and die annual operation and maintenance (O&M) costs, bom calculated on
a present worth basis.

                                             40

-------
       Direct capital costs include costs of construction, equipment, building and services, and
waste disposal. Indirect capital costs include engineering expenses, start-up and shutdown, and
contingency allowances. Annual O&M costs include labor and material; chemicals, energy, and
fuel; administrative costs and purchased services; monitoring costs; costs for periodic site review
(every five years); and insurance, taxes, and license costs.  For cost estimation purposes, a
conservative period often years has been used for O&M for Natural Attenuation with
monitoring. The actual cost for each alternative is expected to be in a range from 50 percent
(50%) higher than the costs estimated to 25 percent (25%) lower than the costs estimated.  The
evaluation was based on die FS cost estimates.

       CM2 is die least costly remedial action which is protective of human health and the
environment. HCB2 is more costly man HCB1, but HCB1 is not considered by EPA to be
sufficiently protective of human health and the environment.  The approximate costs of the
Clarion and Homewood Aquifer Alternatives are given below:
                TABLE - 6 - CLARION AQUIFER ALTERNATIVE COSTS
Alternative
CM1
CM2
CMS
CM4
CMS
Capital
Cost
$0
$37,000
$1,359,000
$1,362,000
$854,000
Yearly O&M Cost
(1996 Dollars)
$0
$38,400
$117,000
$73,400
$119,500
Present Worth
$0
$349,000
$1,830,000
$1,910,000
$1,349,000
                  TABLE -7 - DEEP AQUIFER ALTERNATIVE COSTS
1 Alternative
i
! HCBl
! HCB2
Capital
Cost
$0
$0
Yearly
O&M (1996
Dollars)
$0
$22,800
Present Worth
so|
$82,600 !
                                           41

-------
H. State Acceptance

       The Commonwealth of Pennsylvania has had the opportunity to review and comment on
all the documents in the Administrative Record and has participated in selecting the remedy for
this Site. The State has had the opportunity to comment on the draft ROD and, to the extent
possible, the Commonwealth's comments have been incorporated into the ROD. The
Commonwealth has concurred with this ROD.

I. Community Acceptance

       The community has concerns about  the alternative selected in this ROD. Oral and
written comments on the remedial alternatives evaluated by EPA for the implementation at the
Site are included in Part ffl of this ROD.
X.  SELECTED REMEDY AND PERFORMANCE STANDARDS

       Based upon consideration of the requirements of CERCLA, the detailed analysis of the
alternatives using the nine criteria, and public comments, EPA has selected Alternatives CM2 -
Natural Attenuation with monitoring and HWCB2 • Natural Attenuation with monitoring to
address the remaining ground water contamination at the Site.

CM2-NaturaJ Attenuation with Monitoring: This alternative includes monitoring existing and
new monitoring wells to track the continuing natural attenuation of vinyl chloride and other
VOCs in the ground water. Monitoring of water quality would be performed using EPA method
524.2 for five years after MCLs are reached.

       Rationale:  Monitoring of die Clarion Aquifer and mine void system has shown that
       contaminant concentrations have been decreasing with time, and would likely achieve
       cleanup levels established by the risk assessment in five years or less without active
       remediation. As explained on page 16 under Extent of Contamination, vinyl chloride is a
       gas above 7 degrees Farenheit, and is almost certainly due to the degradation of
       tnchloroethylene. This is strong evidence of biological or chemical processes which are
       degrading chlorinated solvents.  Additionally, trends showing the decline in vinyl
       chloride also support the conclusion that natural attenuation is occurring.  The range of
       concentrations in monitoring wells in the mine void was about 1 • 5 ppb. Only the
       Eickman well showed higher concentrations (5-10 ppb). Concentrations are above the
       MCL (2 ppb), but not dramatically.  A water line has made public water available to
       residents near the contamination plume and with the exception of the Knng and Parker
       wells, the residents have connected to the public water supply including the Eickmann
       residence.

       Additionally, a slurry wall, geocomposite cap and a leachate treatment system have been
       completed to isolate the fill material in the landfill, preventing further leaching into the

                                            42

-------
adjacent aquifer. Monitoring wells in the Clarion and Homewood Aquifers will assure
that unexpected leaching from the landfill does not occur undetected.  The injection wells
were purposely placed between the plume and residents to the east to avoid moving the
contaminant plume4owards the east.  Only the contamination in the Eickman well area is
to the east of the injection system. Additionally, the amount of water injected is small
compared to the volume of the mine pool and should not significantly change its flow
pattern. The extensive well sampling described below will monitor the Clarion ground
water to make sure that residential wells are not impacted and mat the contamination
continues to decline.  If contaminant levels do not continue to decline, or if they
increase, or if additional residential wells are contaminated, EPA in consultation  with the
PADEP will determine what addional action is needed to protect the public.

Performance Standards:  Ground water monitoring shall consist of sampling four wells
in the mine void on a quarterly basis (MWV-4, MWV-6, MWV-7 and MWV-8). Six
wells in the Clarion Aquifer shall be monitored semi-annually (MWC-2, MWC-3, MWC-
4, MW-7, MW-8, and MW-9).  Nine wells in the mine void system shall be monitored
semi-annually (MWV-1 through MWV-8). One new monitoring well (MWV-9) shall be
installed in the mine voids to supplement the existing network. The wells sampled shall
monitor the boundary of the plume and monitor bom migration and attenuation of the
contamination. If sampling results indicate, as determined by EPA and the PADEP, that
the plume is not bounded by the current well system, EPA shall require the installation of
additional wells. In addition, two residential wells (the Kring  and Parker wells), shall be
monitored quarterly.  The ground water samples shall be analyzed for low level TCL
VOCs with results summarized in annual reports. The wells sampled shall be located at
the boundary of the plume and within the plume to monitor both migration and
attenuation of the contamination.  Ground water elevations shall be taken during each
sampling event to make sure that ground water flow directions do not change
significantly.

Monitoring must continue for five years after MCLs and non-zero MCLGs are reached

During the public meeting, the public expressed strong concerns that no residential wells
except the Eickmann well have been sampled since 1994, and mat some low risk wells
had not been sampled since 1993. After consideration of public  comments, EPA agrees
mat the initial round of residential well sampling required above shall include all of the
wells previously sampled, if the well is still open and if the resident agrees to the
sampling of their well. The initial round of sampling shall include the following
residential wells if possible: Rodgers, Orr, Bnggs, Dinninger, McDoiigal, Donnelly,
Hunter, Perry, Stillwagon, Dunn, Bennet, Lazor, Hinds, Eickmann, Kring, and Grande.
After mis initial sampling event, a subset of these residential  wells consisting of
residential wells (8 wells) not using the public water line will be sampled annually until
MCLs are met in the contaminant plume if the resident agrees to the sampling of their
well. This adds a one time initial  expense of about $6,000, an annual O&M increased
cost of about $3,200 and a total present worth increase of about $40,000. The revised

                                      43

-------
       costs for this remedy are:

       CM2 - Capital Cost - $43,000,  Yearly O&M Cost - $41,600, PW Cost- $388,700.

Alternative HCB2 - Natural Attenuation with Monitoring: This alternative includes
monitoring of existing wells in the Connoquenessing, and Burgoon Aquifers to verify
contamination is not migrating from the Site toward community wells. Monitoring of water
quality would be performed using standard methods that are routine and widely accepted.

       Rationale;: Although site related contaminants were not found in the Homewood,
       Connoquenessing or Burgoon Aquifers during the focused RI, sporadic low levels of
       contamination were found in these aquifers during the Remedial Investigation completed
       in 1988. Additionally, EPA considered the fact that the site has been disturbed by
       construction activities and ground water flow patterns in the shallow aquifer will change
       somewhat because of the presence of the slurry wall.  EPA believes that it is prudent to
       monitor these wells which are between the  Site and the Grove City Municipal wells for a
       limited time to make sure that the aquifers remain clean. The purpose of these wells is to
       monitor for an unexpected release and a resultant contaminant plume. These wells are a
       significant distance from the site (one quarter to one half mile northwest) and are located
       in the township right of way along roads. Therefore, EPA would not be surprised to
       trace levels of contaminants such as gasoline or oil components below MCLs  in the
       ground water from these wells as the result  of activities unrelated to the site. The
       purpose of these wells is  is primarily to monitor for an unexpected contaminant plume
       of VOCs, and the presence of trace levels of oil or gasoline components below MCLs
       would not preclude discontinuing monitoring at the end of three years.

       Performance Standards:  Ground water monitoring shall consist of sampling three
       wells in the Connoquenessing Aquifer and three wells in the Burgoon Aquifer for three
       years on a semi-annual basis to confirm past monitoring results. This alternative includes
       monitoring of existing wells in the Connoquenessing (CW-1, CW-2, and CW-3) and
       Burgoon (BW-1, BW-2, and BW-3) Aquifers to verify contamination is not migrating
       from the Site toward community wells.  Monitoring of water quality would be performed
       using EPA method 524.2 .  The samples will be analyzed for low level TCL VOCs with
       results summarized in annual reports. Ground water levels shall be taken at each
       sampling event  If site related contaminants are not found in the wells during the three
       year period, the wells shall be closed. If site related contaminants are found during this
       period, EPA in consultation with the PADEP will determine at mat time, what additional
       sampling needs to be conducted or if additional action is warranted.

Wetland Sediments - No Action - Studies showed that the wetlands to the southwest  of the
landfill had not been impacted and EPA's has determined that no action is required.
                                            44

-------
 XI.  STATUTORY DETERMINATIONS

       This remedy satisfies the remedy selection requirements of CERCLA and the NCP. The
 remedy is expected to be protective of human health and the environment, complies with
 ARARs, is cost effective, and utilizes permanent solutions to the maximum extent possible. The
 following is a discussion of how the selected remedial action addresses the statutory
, requirements.

 A.    Overall Protection of Human Health and the Environment

       The selected alternatives provide overall protection of human health and the environment
 because  there are no residents using contaminated ground water.  The Record of Decision for
 the first Operable Unit prevents new wells on the property containing the plume.  In accordance
 with this previously issued ROD,  EPA will place a temporary deed restriction on the use of
 ground water on the property containing the plume until the ground water reaches MCLs.  The
 Grove City water line was extended around the perimeter of the Site by Cooper Industries, and
 no action is needed to reduce current risks.  There is currently no development occurring on the
 land over the plume.  Additionally, the slurry wall, geo-composite liner cap and leachate
 treatment system has contained the source of ground water contamination. Since the source is
 contained, EPA expects the decline in ground water contamination to continue.  EPA will
 continue to monitor the Clarion, Homewood, Connoquenessing and Burgoon Aquifers to make
 sure that ground water contamination levels reach MCLs in the Clarion Aquifer and remain
 below MCLs in all of the studied aquifers.

 B.    Compliance with Applicable or Relevant and Appropriate Requirements (ARARS)

       The selected alternatives will  comply with the state standards as set forth in (25 PA
 Code, Chapter 109 Subchapter B) and the federal standards (40 C.F.R. Part 141.61)
 (MCLs/Non-zero MCLGs would be achieved in a relatively short time frame). PADEP has
 identified Act n as an ARAR for this remedy; EPA has determined that Act n does not, on the
 facts of the circumstances of this remedy, impose any requirements more stringent than the
 federal standard.

       The selected alternatives will comply with 25 PA Code chapter 107 for well installation.

 C.    Cost Effectiveness

       The selected  remedy is the most cost effective alternative which adequately protects
 public health and the environment The only alternative which would cost less is no action
 without monitoring.

       The only capital cost associated with the selected alternative for the Clarion Aquifer is
 for the installation of one additional monitoring well. This cost is expected to be approximately
 $43,000  including a one time expanded residential well sampling event. The annual cost for

                                             45

-------
 ground water monitoring is approximately $41,600. The present worth cost of this alternative is
 estimated at $388,000 for ten years of monitoring. The time period on degradation rates indicate
 that vinyl chloride should meet MCLs in about five years. Detailed cost information is shown on
 Table 4-1 of the FS.

       There is no capital cost associated with continued monitoring of the deep aquifers at the
.Site. The annual O&M cost for ground water monitoring and well maintenance is approximately
 $22,800  and the present worth cost is $82,600.

       The approximate present worth cost of both monitoring programs for ten years and the
 expanded residential sampling is about $471,000. If the contaminant concentrations decline as
 fast as expected, the cost would be much less.

 D.    Utilization of Permanent Solutions and Alternative Treatment (or Resource
 Recovery) Technologies to the Maximum Extent Practicable

       EPA has determined that the selected remedy represents the maximum extent to which
 permanent solutions and alternative treatment technologies can be utilized in a cost-effective
 manner at the Site. EPA expects ground water to be permanently restored to below MCLs  in a
 relatively short time frame (five years or less).

 E.    Preference for Treatment as a Principal Element

       There were no cost effective remedial alternatives which used treatment as a principle
 element.  EPA expects ground water natural attenuation to reduce contaminants to near or below
 MCLs by the time the alternatives with treatment as a principle element could be employed.

 XII.   DOCUMENTATION OF SIGNIFICANT CHANGES

       During the public meeting, residents were concerned that EPA had not sampled
 residential wells recently, and residents supported a more extensive residential sampling program
 than the one described in the Feasibility Study. EPA has considered public comments and  EPA
 agrees that a one time comprehensive resampling event is appropriate and additionally, that some
 additional residential wells not using public water should be sampled annually.  If new
 contamination is not found, it is unlikely that new residential wells will be contaminated in the
 future, considering the decline in contamination in the Clarion Aquifer, and the fact that a source
 control measure is in place.
                                            46

-------
APPENDIX A

-------

                       i- •/-
'       w«tt« ifvei CONTOU*

— — —  mrimco wic* itvci COHIOWI
   »  tftOUNDMIO >IO« OIIKCIMM

MW09  MCII HI

LW£    KMT INVIHMUCHtU It-CMHUTO

       HAKI [NvmOMMCHML (HWC tfOH.1

       ITAff C1UCC LOCUTIONS
                                                                                                                           '
                                 OVERBURDEN POTENTIQMETRIC SURFACE MAP
                                  OSBORNE LANDFILL SITE. GROVE CITY. PA
                                                   8/30/88
                                                                                                                     190        too
scut IN ran

     -57-
                                                                                                                                           FIGURE  3-9
IMUS
LXJHHCRATCIM

-------
                 I      r
        ..w'  •'•..'   -  '


         •  v:'-n 'i     -,-
         •   •  .   I  *--•>,  i.

             , v      T
LW 9
               /.
               /....
    LCGCHD






•MI* itvu. COtlOuo



iNrcmvp Uff GAUCC IOCATIONI
                                                                                                                                              \
                                                                                                                                         II.OCAICD N THf OfFJITt

                                                                                                                                         HIM ran., not IMOVN ON
                                                                                                                                         THII UtH
                                   OVERBURDEN PQTENTIOMETRIC SURFACE MAP

                                   OSBORNE  LANDFILL SITE. GROVE CITY. PA

                                                     2/21/89
                                                                                                                                                 FICURE 3-10
                                                                                                                                        NUB
                                                                                                                                                   t3N

-------
                                                             MWCI •
                                                           (NO DATA)
                                                                              •MWVI'
                                                                              1283.14
                                  HWC2
                             •f  .283,4
                                                                                                                        MWV3
                                                                                                                        1283 15
                                    >\
                     T
                     '  \
             V  ,
            UGENp

         HMt (HVMONMtMTll (CLMIOn)
mm v 0    «C« 01 (MINI vwo)
MKC 9    mil m (CiMKJNi
   •    »TArr OAuat LOCATION
                  i FLOW
                                                  \
                                                     v ;
                                                        X
   MWV4
~ IZ83.0i
: 'i

                                                                                                            MWvZj,
                                                                                            /  |.\ 1283.13 .//    •
                                                             MWVJ
                                                           i  1283.11
         IMUIMCOI
.'•  ;  ^- *•-
       MWV6'
      ' 1283.12
                                                                               S.6.C  •
                                                                              I2B2.*7
                                                                             ILOCAKO H jut
                                                                             MIME raOL. NOT tMOKN ON
                                                                             THIS HA»|
                     CLARION FORMATION/MINE VOID WATER LEVEL ELEVATIONS
                               OSBORNE LANDFILL SITE. GROVE CITY. PA
                                                 3/3/69
                                                            KAUMfltT

                                                                -61-
                                                                                                                                            FK5UHE 3-11
                 IMUS
                 CX3RPORATC3N

-------
=0
CO
CD
cn

-------
1.
    f
                                                                                      • > f -r-*--  *
                                                                                     „„. 07—' --.•  -J
                                                                                         "' "  \

                                                                                     . tk '   ' •-•*•- ; » '-»—•' /

                                                                                                UCENO
                                                                                             MTC* UVU CCNTOU*
                                                                                          »  OMUNOWMIII »10» OmtCIION
                                                                                      HWM9   Mil ID
                                                                                             HMT IHVMONUINTAL
                                                                                             mcoNiTnucicei
      HOMEWOOD FORMATION POTENTIOMETRIC SURFACE MAP
            OSBORNE LANDFILL SITE. GROVE CITY. PA
                           8/30/88
KM) Mllll

   -64-
                                                                                                       FIGURE 3-12
                    IMLJS

-------
    •U -v    v.'
> •
                 LEGEND


             «"(* uva c«rou»

             *rCmCO CMC* ItVCt OMtOU*

             c«XMo«4tn new DMIKINM
                                                                                                  HMI INVIROMUIItM.
                                                                                                  IMCONSTIIVCTCa)
                                                           ».'•< I'
         HOMEWOOD FORMATION POTENTIOMETRIC SURFACE MAP
               OSBORNE LAMPFii i  SITE. GROVE CITY PA
                             10/20/88
                                                                                                            FIGURE 3-13
KMINHII
ffllMUS
LJJcDRPORflCnDN

-------
                                         •••  •,"?.•.
                                         • f '.•*''. •'
                                    '    '•<.:('
                                         ',.'(    ^V-
                                    :'•'.'•  -iwV
-------
     t
"   ".   *
                                                                                                            LC6ENO

                                                                                                        •«(•> ItVU CO.IOUK
                                                                                                        mr»MO «TH IIKI
                                                                                                        ««oii«ow«tiii
                                                                                                        "t« n
                                                                                                        HAUT CNVMONHtMTAL
   CONNOQUENESSING FORMATinN PQTENTIQMETR|C SURFACE MAP
            OSBORNE LANDFILL SITE. GROVE CITy, PA	
                            10/20/88
                                                                                                                 FIGURE 3-17
IMUS

-------
              .
                                                                                                         v.
                                                                                                      LtCENO


                                                                                            ~^— lrll(* ifvu COMTQUII

                                                                                            — — — BtrMMO WIU IKIL COHIOUI

                                                                                               ^  CMMMOMICII no« tweetio»

                                                                                           MWU9   DIM m
                                                                                                  H1KI (MVIKONUCNtll.
CONNOQUENESSING FORMATION POTENTIOMETRIC SURFACE MAP
         OSBORNE LANDFILL SITE. GROVE CITY. PA
                         2/21/89
                                                                                                            FIGURE 3-18
IMUS
                                                                                         -74-

-------
;):1._
      s.

                                                                                          .  • MTM Hvft COH10UI
                                                                                       •• — " IHftMlO «r>T[» HVCl CtMIIMI
                                                                                          ^ 0*OUMO>UTM H0« DMICIKH
                                                                                       u
-------
                                                                                                    LEGEND



                                                                                                W«» ICVIL COM1W*

                                                                                                MFMWO Mill ICVCl COHKXM

                                                                                                
-------
•* ...
             •L-
                                          - -  .,--::.^U  -^&M./
                                                                                                                   ,r*r
       LCOENO

   W»T« ICVtl. CONIOUK
—  wrtmro «»i» itvti COKTOIM
   e*ouM>«tc* now DIWCTKM
     nr
   lUMT (MVIHONlltNHL
                    pURGOON  FORMATION POTENTIOMETRIC SURFACE MAP
                           QSBORNE LANDFILL SITE. GROVE CITY. PA
                                          10/20/88
                                                                                                                         FIOURE 3-20
           IMUS
                     ON

-------
APPENDIX B

-------
Appendix B - Glossary
                   GLOSSARY OF ENVIRONMENTAL TERMS

Code of Federal Regulations (CFR):  Document that codifies final regulations having
general applicability and legal effect that have previously appeared in the Federal Register.

Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA):
A Federal law passed in  1980 that established Federal authority for responding to the
release of hazardous substances into the environment including creating a Federal fund to
finance responses and imposing liability for releases on the responsible parties. CERCLA
was amended in 1986 by the Superfund Amendments and Reauthorization Act.

Final Close Out Report:  A 'stand alone' report documenting compliance with the
statutory requirements of CERCLA and providing a consolidated record of all remedial
activities at all of a site's operable units.

Final Pollution Report  (POLREP): The document that signifies that a removal has been
completed (i.e., when all objectives outlined in the Action Memorandum  and any addenda,
such as removal and transport of wastes off site, waste disposal, and demobilization have
been accomplished).

Hazard Ranking System (MRS):  A scoring system developed as part of the National Oil
and Hazardous Substances Pollution Contingency Plan (NCP) used to evaluate potential
relative risks to public health and the environment from releases or threatened releases of
hazardous substances.  EPA and States  use the HRS to calculate a site score based on an
actual or potential release of hazardous substances from a site through air migration, surface
water migration, groundwater migration, or soil exposure pathways. This score is used to
decide if a hazardous waste site should  be placed on the National Priorities  List (NPL).

Hazardous Substance:  Under CERCLA section  101(14), any element, compound,
mixture, solution, or substance that, when released to the environment, may present
substantial danger to public health/welfare or the  environment. The term also includes
substances designated as hazardous or toxic under the Clean Air Act, the Federal Water
Pollution Control Act, as amended by  the Clean Water Act of 1986, the  Resource
Conservation and Recovery Act, as amended and the Toxic Substances Control Act.  The
term does not encompass petroleum, including crude oil, natural gaSc. liquids, liquefied
natural gas, or synthetic  gas usable for  fuel.

Local Notice of Intent to Delete:  A notice published in a local newspaper of general
circulation, announcing the Agency's intent to delete a site from the NPL.   It also
announces a 30-day public comment period, among other things, and identifies the location
                                        G-!

-------
Appendix B - Glossary
 of the local repository.

 Long-Term Response Action (LTRA): A site that requires a long, continuous period of
 on-site activity before the cleanup levels specified in the ROD are achieved.

 National Oil and Hazardous Substances Pollution Contingency Plan (NCP):  The
 regulation for Federal response actions under CERCLA, commonly referred to as the
 National Contingency Plan, or NCP.  The NCP sets forth the Hazard Ranking System and
 establishes procedures and standards for responding to releases of hazardous substances.
 The plan has been codified in Title 40 CFR Part 300.

 National Priorities List (NPL):  EPA's list of the most serious uncontrolled hazardous
 waste sites identified for possible long-term remedial response.  This list is based primarily
 on the score a site receives on the Hazard Ranking System. EPA is required to update the
 NPL at least once a year.

 Notice of Deletion (NOD): A notice published in the Federal Register announcing a site's
 deletion from the NPL.

 Notice of Intent to Delete (NOID): A notice published in the Federal Register
 announcing the Agency's intent to delete a site from the NPL.  This notice provides
 information about the site and associated cleanup activities, and provides the public with a
 30-day public comment period.

Operable Unit (OU):  A term for each of a number of discrete activities undertaken as
part  of a Superfund site cleanup. An example of an operable unit would be removing
drums and tanks from a surface of a site.

Operation and Maintenance (O&M):  Activities conducted at a site after a Superfund site
action is completed to ensure that the action is effective and operating properly.

Potentially Responsible Party (PRP):  Any individuals) or company(s) (such as owner,
operator, transporter, or generator) potentially responsible for, or contributing to,
contamination at a CERCLA site.  Whenever possible, EPA requires PRPs, through
administrative and legal actions, to clean up hazardous waste sites that they have
contaminated.

Preliminary Assessment (PA):  The process of collecting and reviewing existing
information about a known or suspected hazardous waste site or release.  EPA uses this
information to determine if the site requires further study. If further study is needed, a site
                                         G-2

-------
 Appendix B - Glossary
 inspection is performed.

 Preliminary Close Out Report:  A report, documenting the completion of the physical
 remedy construction at a site, that is prepared after work at the final operable unit is
 complete.  To name  a few, it summarizes the release at the site, site conditions,
 construction activities, and any response actions.

 Quality Assurance/Quality Control (QA/QC):  A system of procedures, checks, audits,
 and corrective actions to ensure that all EPA research  design and performance,
 environmental monitoring and sampling, and other technical reporting activities are of the
 highest achievable quality.

 Record of Decision  (ROD):  A public document that explains which cleanup alternative(s)
 will be used at National Priorities List sites.  The ROD is based on information and
 technical analysis generated during the remedial investigation/feasibility study and
 consideration of public comments.

 Remedial Action (RA):  Taken instead of or in addition to a removal action, a remedial
 response is the permanent remedy taken at a site; it seeks to prevent or minimize the
 release of hazardous  substances and to prevent  further migration.  Remedial actions may
 include storage, confinement, perimeter protection, neutralization, cleanup, recycling, repair
 of leaking containers, bioremediation, and incineration.

 Remedial Action Report:  The Remedial Action  Report documents the activities that
 occur under each specific remedial action operable unit at a site.  It also provides
documentation that a particular operable unit has met its objectives, and certifies that all
 items in the settlement agreement and any incorporated documents have been met.

Remedial Design (RD):  A phase of remedial action that follows the remedial
investigation/feasibility study and includes development of engineering drawings and
specifications for a site cleanup.

 Remedial Investigation/Feasibility Study (RI/FS):  Two distinct but related studies.
They are usually performed at the same time, and together are referred to as the RI/FS.
They are intended to: (1) gather the data necessary to determine the type and extent of
contamination at a CERCLA site listed on the National Priorities Lift  (2) establish criteria
for cleaning up the site;  (3) identify and screen cleanup alternatives for remedial action; and
(4) analyze in detail the technology and costs of the alternatives.

Remedial Project Manager (RPM):  The EPA or state official responsible for overseeing
                                         G-3

-------
 Appendix B - Glossary
 remedial action at a site.

 Removal Action (RA): The cleanup or removal of released hazardous substances from the
 environment or the taking of other actions as may be necessary to prevent, minimize, or
 mitigate damage to the public health or welfare when immediate action is considered to be
 necessary.  In addition to physically removing hazardous substances from the site, removal
 actions may include measures to limit access to  the site and the provision of alternative
 water supplies and temporary housing.

 Resource Conservation and Recovery  Act (RCRA): An  amendment to the Solid Waste
 Disposal Act, addressing the safe management of the hazardous and non-hazardous
 municipal and industrial waste  generated nationwide. This act governs hazardous waste
 treatment, storage and disposal facilities, and was amended  in 1984 by the Hazardous and
 Solid Waste Amendments.

 Site Inspection (SI): An investigatory phase following a preliminary assessment in which
 more extensive information is collected  through site sampling.  The collected information is
 used to score a site under the Hazard Ranking System to determine whether the site will be
 placed  on the National Priorities List.

 Superfund: The common name used for the Comprehensive Environmental Response,
 Compensation, and Liability Act of 1980, as amended in 1986 and the EPA activities
 implementing the Act.

 Superfund Amendments and  Reauthorization Act (SARA): Amendments to CERCLA
 enacted on  October 17, 1986, that expanded the size of the cleanup fund, established
cleanup standards and deadlines for response actions, and addressed cleanup of Federal
facilities.

Trust Fund: Commonly referred to as "Super-fund," this is a fund established by
CERCLA to pay for the cleanup of hazardous waste sites and for the costs of legal action
 necessary to force those responsible for  creating the sites to clean them up or pay for clean
up costs.
                                        G-4

-------
                  PART III

          RESPONSIVENESS SUMMARY
                  FOR THE
       PROPOSED REMEDIAL ACTION PLAN
           FOR OU-2, OU-4, AND OU-5
                  OF THE
      OSBORNE LANDFILL SUPERFUND SITE
PINE TOWNSHIP, MERCER COUNTY, PENNSYLVANIA

             Public Comment Period
       August 6, 1997 through October 9, 1997

-------
                          Osborne Landfill Superfund Site



                             TABLE OF CONTENTS


                                                                        page

Overview    	   4

Background 	   6

Part 1:  Summary of Commentors' Major Issues and Concerns Expressed At the
        Public Meeting


A. General Site- Specific Issues                                                     8

B. Extent of Contamination                                                       10

C. Type of Contamination                                                        17

D. Residential Well Sampling                                                     17

E. Slurry Wall/Containment Issues                                                 19

F. Health Risks                                                                 21

G. Other Issues                                                                 21


Part II : Written Comments Submitted During The Public Meeting                  23


Part III: Written Comments Received During the Comment Period                  24

-------
This responsiveness summary is divided into the following sections:

Overview:    This section discusses the U.S. Environmental Protection Agency's (EPA)
              preferred alternatives for the remedial action at the Osbome Landfill Superfund
              Site (the site).

Background:  This section provides a brief history of community relations activities conducted
              during remedial planning at the site.

Part I:        This section provides a summary of commentors' major issues and concerns
              expressed during the public meeting and EPA's responses to those issues and
              concerns. "Commentors" may include local homeowners, businesses, the
              municipality, contractors representing citizen group interests and potentially
              responsible  parties(PRPs).

Part II:        This section provides responses to written comments given to EPA at the public
              meeting.
Part III:       This section provides responses to written comments sent to EPA during the
             comment period.

-------
 Overview

 On August 6,  1997, EPA announced the opening of the public comment period and published
 the Proposed Remedial Action Plan (Proposed Plan) for Operable Units (OUs) OU-2 - Wetland
 Sediment, OU-4 - Clarion"Aquifer and Mine Void System, and OU-5 - Homewood, Burgoon,
 and Connoquessing Aquifers for the Osborne Landfill Superfund Site located  in Pine Township,
 Mercer County, Pennsylvania.  The Proposed Plan details EPA's preferred clean-up alternatives
 to reduce site contamination.  In selecting the clean-up alternatives, EPA considered the
 following nine evaluation criteria:

 Threshold Criteria
       Overall protection of human health and the environment
       Compliance with Federal, state, and local environmental and health laws

 Balancing Criteria
       Long-term effectiveness and permanence
       Reduction of mobility, toxicity, or volume of contaminants
       Short-term effectiveness
       Ability to implement
       Cost
 Modify Criteria
       State acceptance
       Community acceptance

 EPA carefully considered state and community acceptance of the clean-up alternatives before
 reaching  the final decision regarding the clean-up plan.  The Record of Decision (ROD) details
 EPA's final clean-up decision.

 EPA's preferred clean-up alternatives are outlined below.  Based on current information, these
alternatives meet the  nine evaluation criteria EPA used to evaluate each alternative.  EPA
selected one alternative for each OU.

OU-2 - Wetland Sediment

EPA required no action for the wetland sediment.  Contamination  was not found at levels that
presented an unacceptable risk to the environment; therefore, EPA did not develop or evaluate
alternatives.

OU-4 - Clarion Aquifer and Mine Void System

EPA's preferred alternative is natural  attenuation with monitoring.  EPA will conduct regular
monitoring activities  to ensure that contamination concentrations continue  to decrease.

OU-5 - Homewood,  Burgoon, and Connoquessing Aquifers

EPA's preferred alternative for the Homewood, Burgoon, and Connoquessing Aquifers is

-------
natural attenuation with monitoring. EPA determined that the Homewood, Burgoon  and
Connoquessmg Aquifers are undergoing natural attenuation and have already reached safe
levels.  Therefore, EPA does not propose to conduct any active ground water treatment.

-------
 Background

 The Osborne Landfill Superfund Site is one mile east of Grove City, Pennsylvania, and covers
 approximately 15 acres.  Residential homes are located approximately one quarter mile north of
 the site.  Due to ground water contamination, Cooper Industries (Cooper), one of the PRPs for
 the site, extended the municipal water line to the nearby homes.  All of these homes, except
 one, use the public water supply.

 The major concern at the site was approximately 233,000 cubic yards of fill material that was
 contaminated with metals and volatile organic compounds.  The fill material disposed at the site
 included:
       used sand;
       infilco sludge (sludge settled and collected from hydroblast equipment);
       used carbide (a byproduct consisting of a lime and water slurry);
       waste acids from plating and cleaning tanks;
       processed solvents; and
       miscellaneous debris.

 During the 1940s, the site was used for strip mining.  After the 1940s, the property owners
 disposed waste in the former strip mining pool.  From the 1950s through 1978, the landfill
 accepted various types of industrial wastes.   After the landfill closed, EPA and the
 Pennsylvania Department of Environmental Resources (PADER), now known as the
 Pennsylvania Department of Environmental Protection (PADEP), found many hazardous
 substances on the site property.

 In 1983, EPA placed the site on the National Priorities List.  At that time, EPA divided the site
 into different areas of concern, to make the site  more manageable for clean up. The five OUs
 for the Osbome Site  are:
       OU-1 - Fill Material  in Strip Pit
       OU-2 - Wetland Sediment
       OU-3 - Leachate
       OU-4 - Clarion Aquifer and Mine Void System
       OU-5 - Homewood, Burgoon, and Connoquessing Aquifers

In August 1989, EPA thoroughly studied the site, assessed the risks of the site to the
community, considered possible clean-up actions for the site,  and issued  a Proposed Plan for
OU-l and OU-3. EPA chose, as its preferred clean-up method, the  construction of a hazardous
waste landfill on the  site to contain the contamination.

After conducting a site investigation in August 1989, EPA and a group of slurry  wall experts
met and discussed the positive and negative points of constructing  a slurry wall to contain the
waste as opposed to constructing the planned hazardous waste landfill.  The group decided that
constructing a slurry  wall would be a more appropriate and efficient method to contain the site
waste due to conditions at the site.

In 1990, EPA issued a ROD that identified the slurry wall as the preferred clean-up method.

-------
Construction of the landfill was named as a back-up plan.  If the slurry wall ever fails, the
PRPs are required to construct the landfill to contain the wastes.

After issuing the ROD, EPA negotiated with the PRPs, but could not reach a voluntary
agreement to clean up the'site.  In 1991, EPA ended its attempts to negotiate and legally
ordered the PRPs to construct the slurry wall.

In February 1996,  EPA mailed a fact sheet to interested citizens identified on an EPA mailing
list.  The fact sheet discussed construction plans for the site, previous site monitoring, and a
general description of current activities at the site.

On August 6, 1997, EPA issued a second Proposed Plan.  On  the same day, a public notice
appeared in the Allied News announcing the Proposed Plan and the upcoming public meeting.
On August 25,  1997, EPA held the public meeting at the East Main Presbyterian Church to
announce EPA's clean-up methods for OUs 2, 4, and 5, as described in the Proposed Plan. At
the August 1997 public meeting, EPA discussed the Proposed  Plan and addressed the public's
questions and concerns about the clean-up alternatives, EPA distributed a fact sheet at the
public meeting  that discussed the site history, EPA's preferred clean-up alternatives, and the
other alternatives for the site clean up.  EPA also sent the fact sheet to interested citizens on
EPA's site mailing list.

Due  to numerous public comments, questions, and concerns received during the  public comment
period, EPA extended the comment period for an additional 30 days.  Comments and questions
about the Proposed Plan are summarized in the following sections of this responsiveness
summary.

-------
 Part I: Summary of Commentors' Major Issues and Concerns

 This section provides a summary of commentors' major issues and concerns expressed at the
 public meeting and EPA's. responses to those issues and concerns.  "Commentors" may include
 local homeowners, businesses, the municipality, and PRPs. The major issues and concerns
 about the proposed clean-up alternatives for the Osborne Site received during the public
 meeting on Monday, August 25, 1997,  are grouped into the following categories: general site-
 specific issues, extent of contamination, type of contamination,  residential well sampling, slurry
 wall/containment issues, health risks, and other issues.

 A.    General Site-Specific Issues

 1. Comment: A citizen asked about the owner and taxpayer of the building on  site.

 Response: Cooper Industries owns the building on site.  The county recorder's office will have
 information on taxes related to the  building and the site property.

 2. Comment: A citizen asked whether EPA would pay the fair market price for buildings and
 property if residents near the site decided to leave.

 Response: Except for extremely unusual cases such as the dioxin contaminated site Times
 Beach, EPA does not purchase residents' property near Superfund sites.  EPA's goal is to clean
 up Superfund  sites so that they do not impact residents' health  or their ability to sell their
 property.  The Osborne Landfill Site is close to being remediated. The contaminant source has
 been contained and EPA expects the affected ground  water in the area to reach safe levels
 within three to five years.

3. Comment: A citizen asked about the direction of runoff, and  was confused regarding the
discussion of site drainage via surface water runoff versus seepage from the onsite pond to the
 mine voids.   The citizen was  concerned that surface  water and ground  water flows could have
contaminated the shallow aquifer with site contaminants.

Response: Figure 2 in this Record  of Decision shows the influent stream and effluent stream at
the site prior to construction of the slurry wall/cap. Surface water generally entered the site
from the cornfield to the north of the site and via the influent stream.  The spoil piles to the
southwest of the site generally prevented runoff from the site except at  the southern end  of the
site.  Site surface water drainage was to the wetlands at the  southern end of the  site which
drained into the effluent stream shown on Figure 2. A more detailed depiction of site runoff is
 shown in figure 3-23 of the Final Remedial Investigation Report dated August 1989.

       Water from the influent stream drained into pond no. 1  shown in figure 2.  Pond number
2 then leached into the fill and could also drain in the subsurface to the mine voids or flow to
the southeastern end of the site where it could emerge as leachate springs draining into the
wetlands.  The wetland sediments were tested during  the NUS  investigation for site
contaminants and resampled during the most recent investigation.

-------
 4.  Comment: A citizen asked whether EPA placed and sampled wells in the glacial material
 [West of the site] to determine whether the glacial material was contaminated.

 Response:  EPA did not place or sample wells in the glacial material during the most recent
 Remedial Investigation, however EPA did place and sample wells in the shallow zone to the
 west of the site during the Remedial Investigation conducted in the late 1980s for all site
 contaminants including metals. Contaminants were not found in these samples at levels of
 concern.

 5.  Comment: A citizen asked whether EPA examined the potential that water could leave the
 site in any direction.

 Response: Surface water runoff has been described in the response to question 3 above. The
 direction of ground  water flow in each of the aquifers at the site is described in the Record of
 Decision and specifically is shown in Appendix A of the ROD.

 6. Comment: A citizen asked whether the water from the mine void was being drawn into the
 slurry wall containment by the extraction wells.

 Response: Some water is certainly infiltrating into the containment area from the surrounding
 formations.  EPA expected some leakage along the slurry wall and through the base of the
 containment. This leakage is the reason that EPA insisted on extraction wells inside the fill
 area.  Somewhat less  water is leaking into the containment than expected during the remedial
 design.  Leakage is  not a negative aspect, since the more water that leaks into the containment,
 the faster contaminants will be flushed out of the fill and removed by the water treatment plant.
 The extraction wells will continue until the fill poses no threat to ground water. Increased
 pumping does however increase operations and maintenance costs to Cooper Industries.

 7.  Comment: A citizen asked whether EPA knew where the water in the mine voids was
 moving  and  what its source was, other than the pond.

 Response: The flow in the mine void  is toward the southeast. The water in the mine void  is
derived  from precipitation and infiltration via many sources, as well as ground water flows.
 EPA has not performed a detailed study of the area wide ground water flows into and out  of the
 mine pool. EPA has studied ground water flows near the site, and this is sufficient to
 understand the risks from the existing  ground water contamination.

 8. Comment: A citizen asked why no wells were monitored in 1996.

Response: In general, all wells are sampled as part of a Remedial Investigation and then there
is a period during which the Remedial Investigation, Risk Assessment and Feasibility Study
reports are developed and approved. During this time period, which can take one to two years,
the monitoring wells are usually not sampled. Residential wells at risk may be sampled during
this period if necessary. The Remedial Investigation showed that, except for the Eickmann
well, contamination was confined to the ground water under the cornfields east of  the  site.
Additionally,  Cooper Industries extended the water line around the eastern side of the  site and

-------
connected all individuals along the water line except the Kring and Parker residences.  In EPA's
opinion, the risks to the public from ground water contamination were low.  EPA made the
completion of the slurry wall,  cap and extraction system a higher priority than the ground water
action.  Other projects with greater risks needed to be addressed during this time period.

9.  Comment: A citizen asked when EPA will announce its clean-up decision.

Response: EPA first considers all public comments and makes any necessary changes to the
Proposed Plan.  EPA  developes the  ROD, formally selecting the  clean-up plan for the site
ground  water, places the ROD in the information repository, and announces its availability in
the local newspaper.

10  Comment: A citizen asked about elevated metals concentrations (particularly arsenic -
average 36 ppm) in the offsite pond sediments.

Response:  The results of chemical analysis of the compounds in the offsite pond do not match
the "finger print" of compounds  on the Superfund Site.  There is a small section of the offsite
pond on a nearby residential property that appears to been filled in with mine spoil  or some
other fill which may have elevated the arsenic levels.  Additionally, the influent stream, which
did not  pass through the site, also had somewhat elevated levels of arsenic in its sediments.
Arsenic is often  linked to agricultural sources. At one time, arsenic  was a common pesticide
used by agriculture  (lead arsenate). Pesticides can range from 22 to 60 % arsenic.  Additionally,
phosphate fertilizers can range from 2-1200 ppm arsenic and nitrogen fertilizers can range from
2-120 ppm arsenic (Kabata-Pendias an Pendia 1984). The site is surrounded by nearby
agricultural land use. Background levels in soils range from 1 -93 ppm although the average
level in U.S. soils is about 7 ppm.  In summary, the arsenic level  is  only five times higher than
the U.S. average background levels in soils and is within the range of arsenic levels typically
found in area soils.  The soil and sediment levels onsite are lower than the levels in the offsite
pond and correspond to typical background levels.  EPA does not  believe that the elevated
arsenic levels are due  to site activities.

11. Comment: A citizen asked whether the water quality on the Federally-protected wetland on
the site  has been tested.

Response:  Yes.  The  wetland  showed minimal contamination.

12. Comment: A citizen commented that the comment period should be extended because there
is not a complete record of information at the Grove City Library.

Response:  EPA  extended the public comment period to October 9, 1997.
B.     Extent of Contamination

1. Comment: A citizen asked at what distance and direction from the landfill EPA tested
residential wells.

-------
 Response: Residential wells were sampled to the northeast of the site, the east of the site, and
 southeast of the site.  The rationale for this sampling pattern was the presence of the mine pool
 to the northeast, the east and the southeast.  The farthest well to the northeast (Dinninger) was
 over 1/2 mile from the site, the farthest well directly east was about 1/2 mile (Stillwagon), and
 the well farthest to the southeast - almost directly south - (Grand) was about 1/4 mile away.

 2. Comment: The citizen asked for clarification concerning whether EPA was required by law
 to test all residences within a quarter mile radius of the site.

 Response:  During site  investigations, EPA tests wells, based on an understanding of site
 conditions and contaminant migration.  EPA knows of no Federal or State regulation which
 requires periodic sampling of residential wells within a specific radius of a landfill.

 3. Comment:  A citizen asked whether EPA tested the Kring well quarterly since it is  in the
 direction of the plume.

 Response: EPA tested the Kring well once  in 1988, once in 1993, and three times in 1994.  No
 contamination was ever detected in this well.  EPA will  include the Kring well in the
 monitoring program that is part of the cleanup plan  for the site to ensure that the contamination
 in the plume continues to be confined to the cornfields and that the contamination in the
 Eickmann well area does not migrate to the Kring well.

 4. Comment:  A citizen asked EPA to draw a map of the plume based on the testing results.

 Response: The exact shape of the plume  is irrelevant so long as EPA has defined the area that
 the plume is limited to by clean wells outside the plume.  EPA has mapped the general extent
 and direction of the plume based on monitoring well sampling results.  The important point is
 that a band of clean wells over a substantial timeframe has generally defined the extent of the
 plume.  EPA cannot draw a map specifically outlining the plume because of the mined
 environment. A smooth drawing of an interpolated  plume limit would be misleading.  Even by
 drilling many more wells and conducting more extensive sampling, EPA still could not define
 the exact shape of the plume.

 5. Comment:   A citizen asked whether the  Clarion Aquifer and the mine are interconnected.

 Response: Yes. The Clarion Aquifer and the mine are interconnected as explained in detail in
 the Record of Decision and the Remedial Investigation report.  The Clarion Aquifer is  a
 relatively thin layer of sandstone above the  mine voids. Subsidence has caused fracturing of the
 sandstone which increases the communication between the voids and th&aquifer.

6. Comment:  A citizen asked whether a preferential pathway, similar to the one EPA
believes is impacting the Eickmann well,  could exist beyond EPA's understanding of where the
plume ends.

Response: This question implies that it is possible to define the subsurface environment with
absolute certainty.  A preferential pathway for contaminant plume migration beyond the

                                                                                       _

-------
 waterline is possible, but unlikely.  If EPA studied the site and installed an additional 100 wells
 this possibility would still exist, as it does at every single Superfund Site. While most sites
 don't sit above mine voids, most sites do contain bedrock in which fractures can provide an
 unknown path of contamination.  Fortunately at this site, EPA has a great deal of data both on
 ground water flow directions, and extent of contamination. Furthermore,  the concentrations of
 contaminants are currently approaching  safe levels.  Therefore, EPA deems the risk to the
 public to be very low.

 7. Comment: A citizen asked whether the proposed monitoring program will show the extent
 of the plume.

 Response: EPA has established the extent of the plume. The purpose of the proposed
 monitoring program is to make sure that the levels of contamination in the Clarion Aquifer
 continue to decline and will reach safe levels within three to five years.  The purpose of the
 monitoring program is not to  try  to define the extent of the plume. However, in the unlikely
 event that  the plume has changed and migrated to the east, the monitoring program would
 reveal the change and EPA would have to reappraise the risk to the public and the Natural
 Attenuation Remedial Action.

 8. Comment: A citizen asked whether the levels of contamination that EPA detected in the
 Clarion Aquifer during testing for the first proposed clean-up plan were similar to those levels
 detected in the Eickmann well.

 Response: Detections have generally been low and sporadic in the Clarion Aquifer. One well
 showed a level of 47 ppb in the past in the Clarion Aquifer. This level showed a steady decline
 over the years and the wells between the site and the Eickmann well  have not showed a
 corresponding increase.  EPA does not believe that the plume has migrated from the site to the
 Eickman well and further east as some commentors suggested.

 9. Comment: A citizen asked how EPA determined that contaminated water was being drawn
 from the mine pool and not the Clarion Aquifer during testing for the first proposed clean-up
 plan, since the two are connected. The citizen  also asked about the location of the pump test
 wells.

 Response: Wells were completed in both the mine voids and in the Clarion sandstone above
 the mine voids. Much more contamination was found in wells completed in the mine void wells
 than in the sandstone wells. During a pump test of the Clarion Aquifer, the radial influence of
 the pumping wells laterally was very small indicating that the water moved up from below.

The original proposed clean-up plan involved  first treating the water  in the Clarion Aquifer,
which  was used for drinking water, and then the water in the mine pool.  When the pump test
was conducted for this clean-up plan, EPA found that the proposed system would draw the
contamination up from the mine  void into the  Clarion Aquifer, further contaminating the
Clarion Aquifer.  EPA knew this because EPA other wells around the pump test well were
monitored to determine the cone  of influence.  The data from these other wells indicated that
the pump test well was not developing a cone of influence, and that more contaminated water
                                                                                       _

-------
 was coming from the mine pool.

 The location of the nest of wells was at the extreme southeast end of the site, near MW-V2 on
 Drawing 95414.18-M1 of,the Feasibility Study. This location was selected because vinyl
 chloride was highest at this location and was, therefore, the best location for an extraction well.

 10. Comment:  A citizen asked whether the data from the pump test for the initial clean-up
 plan was publicly available.

 Response: Additional details on this testing is available in the appendices of the Remedial
 Investigation. This data is available at the local  information repository, the Grove City Library,
 125 West Main Street, Grove City, and also  in the EPA Region III information repository
 located at 841  Chestnut Street, Philadelphia.

 11. Comment: A citizen asked whether EPA tested wells only east and southeast of the
 landfill.

 Response: See response to comment number 1 above. Also see figure 95414.18-M1  in the
 Feasibility Study located in the site repository.  Also see 95414.1-El which shows all
 monitoring wells tested during the last remedial investigation.  The first Remedial Investigation
 during the late  1980s defined flow directions in each of the respective aquifers and determined
 which contaminants were migrating from the site in ground water.  EPA based the location of
 the wells in the last supplemental Remedial Investigation on the finding of the 1988  Remedial
 Investigation.

 12. Comment: A citizen asked whether EPA tested any private wells to the north of the site.

 Response; No. EPA did not test any private wells to  the north of the site.  The homes north of
 the site are served by a public water line and ground water flow direction in the contaminated
 Clarion Aquifer is to the  southeast.

 13. Comment: A citizen asked in which direction the  Clarion Aquifer is moving.

 Response: Flow in the the Clarion Aquifer moves to the southeast.  The mine void or pool
controls the movement of the Clarion Aquifer.  When  the landfill still existed, the pond in the
 north end  of the landfill was fed by a stream and the water in the pond fed directly into the
 aquifer with no outflow.  During wet periods, the water in the  pond would build  up  and force
 water through the aquifer to the east.  During dry periods, the stream aad the pond would start
 to dry up and reduce the  flow component to the east.  Thus, the flow of the water may have
 fluctuated more to  the east during periods of heavy rainfall.  A flow component to the east
 from water draining from  the onsite ponds has been eliminated by installing the slurry wall and
clay cap.

 14. Comment: A citizen asked whether, during wet periods, the  increased flow through the
aquifer was helping dilute the contamination.
                                                                                        13

-------
 Response: The water being forced through the aquifer during wet periods comes from the pond
 where it has collected contaminants.  Therefore, during wet periods, contaminated water, not
 clean water, is being forced through  the aquifer. However increased clean ground water flows
 from outside the aquifer would tend  to reduce contamination.

 15. Comment: A citizen asked whether EPA had determined the rate that the water flows into
 the mine by using a dye test.

 Response: EPA tried using a dye test during the aquifer pump test. The dye injected nearby
 never was drawn to the extraction well. The random location of galleries and convoluted
 pathways would probably give widely varying results based on the injection point.  Therefore,
 EPA does not believe that dye tests would be worthwhile at this site.

 16. Comment: A citizen asked whether there is a mine void connection to the Kring pond.

 Response:  The Kring pond is a strip-mined pit that is right on the border of the deep-mined
 area.  However, it is not known whether there is a mine shaft directly opening to the pond.

 17. Comment:  A citizen asked whether the Kring pond was directly connected to the landfill
 and could become contaminated.

 Response:  The Kring pond is connected to the mine pool, and the landfill is also connected to
 the mine pool. There is no data which suggests that the Kring pond has become contaminated
 through connection to the mine void. Metals and other compounds have not migrated to the
 adjacent aquifers and contaminant levels of vinyl chloride in the mine pool are  low.  The Kring
 pond has been sampled several times and the results have indicated no vinyl chloride
 contamination.

 18. Comment: A citizen asked whether the mine void discharged at the Kring pond.

 Response:  As explained previously,  ground water in the mine void moves towards the
southeast. Water to the northwest of the Kring Pond would be expected to flow to the Kring
pond.  EPA has not studied this issue in detail, because this information is not needed to
address the contaminant  plume.

 19. Comment: A citizen questioned  EPA's assertion, based on declining vinyl chloride levels in
 monitoring wells, that the plume has contracted.  The citizen instead alleged that the plume may
 have moved beyond EPA's plume boundary.

 Response:   Long term ground water contamination from a source such as the Osbome Landfill
does not generally "migrate" to new areas.  Typically, a ground water plume emanates from a
waste source just as a smoke plume  emanates from a fire.  A smoke plume is diluted as it
mixes with air until at some distance it is no longer visible. At the peak of the  fire, the visible
 smoke extends the farthest from the  fire. As the fire is exhausted, the smoke plume contracts
 and extends less far. As  the fire dies and only embers are left, the smoke will only be visible
 very near the fire. During the  1970s, the Osborne ground water contamination plume probably

-------
 extended much farther to the southeast than it does today, and may even have extended into the
 Homewood, Connoquenessing and Burgoon Aquifers. Since the landfill closed in 1978, almost
 twenty years ago, EPA believes that the plume is contracting, not moving to new areas.  The
 selected  remedy will monitor the plume to verify that the plume continues its decline.

 20. Comment: Several citizens questioned EPA's use of the Eickmann well to demonstrate that
 contamination in the aquifer has decreased.

 Response: The Eickmann well is just one piece of data in the overall contamination picture.
 Although the vinyl chloride in  the Eickmann well has fluctuated, the overall trend of
 contamination in the Clarion Aquifer is downward.

 21. Comment:  A citizen questioned the validity of the Eickmann well data because it was not
 tested repeatedly under the same conditions.  The citizen was making reference to the  fact that
 the Eickmann well is no longer used.

 Response: The sampling efforts conducted around the site since 1986 have been substantial.
 Many of the domestic wells were  only sampled once during a very extensive sampling effort.
 Most of  these wells were not resampled because they were clean and the extent of
 contamination was adequately defined. Sampling of the Eickmann well has continued even
 though this well is no longer active. Even though the removal of this well from active use
 constitutes a change in conditions, this change is likely to be insignificant in terms of water
 quality. A typical domestic well withdraws only a couple of hundred gallons per day of water
 and does not develop a substantial capture zone. Termination of its use has not had a substantial
 impact on the hydrogeologic regime in this area.

 22. Comment:  A citizen proposed that some of the nondetects on the edge of the plume may
 have been caused by the ebb and flow of ground water in the Clarion Aquifer.

 Response: Of course there is always seasonal variability due to precipitation and attendant
 increased ground water flows.  EPA believes that sufficient data was gathered over the years to
 have an accurate enough assessment of the contaminant plume.  Additionally, this ROD requires
 additional sampling which will further define the current state of the ground water
 contamination plume.

23. Comment: A citizen asked what has stopped contaminated water from seeping through the
 porous spoil to the west of the site.

 Response: Cooper Industries' contractor and EPA documented that the elevation of the spoil
piles limits surface water runoff. Additionally, ground water elevations demonstrated that
ground water flows into the fill from the adjacent wetlands.

24. Comment: A citizen asked whether EPA had evidence confirming the hypotheses that iron
levels or biological activity are affecting the rate of vinyl chloride degradation.

Response:  Several facts support EPA's belief that natural attenuation is occurring.  Vinyl

                                                                                       _

-------
 chloride itself is not a solid waste contaminant. Vinyl chloride boils at 7 degrees Fahrenheit,
 which means that at normal temperatures in Grove City, it is a gas. To EPA's knowledge,
 Cooper Industries did not use vinyl chloride in any of its operations. Typically only the plastics
 manufacturing industry uses vinyl chloride (to produce polyvinyl chloride  (PVC) plastic).  EPA
 believes that it is extremely unlikely that any  vinyl chloride was disposed  of at the Osborne
 Landfill.

       EPA often detects vinyl chloride at sites where trichloroethylene (TCE) solvent has been
 disposed into the subsurface. Trichloroethylene is a solvent which was used by dry cleaners and
 for metal degreasing until recently. This is one of the most common ground water contaminants
 in EPA Region 3. At many sites TCE breaks  down into  the "daughter products"
 Dichloroethylene and vinyl chloride and finally ethene gas, by sequentially losing a chlorine
 atom from the parent molecules. This can happen due to bacteria or to chemical reactions in the
 subsurface. The  final degradation product is ethene gas which is a harmless gas emitted by
 ripening fruit.  EPA believes that the vinyl  chloride at the Osbome Landfill is the chemical
 "ghost" from substantial TCE contamination in the past.  It will continue to degrade to ethene
 gas. Also, some of the vinyl chloride will volatilize into the pore space of the soil and either
 be degraded or dispersed in air at harmless  concentrations.  Dilution and dispersion also reduces
 the concentration of the vinyl chloride plume the further it travels from the source. The source
 of contamination (the fill area)  has been isolated from the Clarion Formation by the slurry wall
 and an inward pressure gradient.

 25. Comment:  The citizen asked whether  it  was possible for the plume to be immobile.
 Since EPA cannot prove that the iron levels or biological activity is increasing the rate of vinyl
 chloride degradation, the citizen was concerned the the decrease in concentrations noted in the
 Clarion wells might be due to movement of the plume to the east.

 Response: Long term ground water contamination  from a source such as the Osborne Landfill
 does not generally "migrate" to new areas.  Typically, a ground water plume emanates from a
 waste source just as a smoke plume emanates from a fire. A smoke plume is diluted as it
 mixes with air until at some distance it is no  longer visible. At the peak of the fire, the visible
 smoke extends the farthest from the fire. As the fire is exhausted, the smoke plume contracts
 and extends less far. As the fire dies and only embers are left, the smoke  will only be visible
 very near the fire. During the 1970s, the Osborne ground water contamination plume probably
 extended much farther to the southeast than it does today, and may even have extended into the
 Homewood, Connoquenessing and Burgoon Aquifers.  Since the landfill closed in 1978,  almost
 twenty years ago, EPA believes that the plume is contracting, not moving to new areas.  The
 selected remedy  will monitor the plume to verify that the plume continues its decline.

 As  explained above, EPA cannot prove the mechanism by which vinyl chloride occurred in the
aquifer.  However,  there is no other reasonable explanation for it's presence other than
degradation from PCE or TCE  solvents. Since degradation has occurred, it should continue to
occur. This is supported by data which shows the decline.

 26 Comment: A citizen questioned EPA's  assertion in the Ecological Risk Assessment that
elevated levels of metals detected at the site are  related  to the mining environment rather than

                                                                                        _

-------
 the site.

 Response: As explained in the previous question above regarding metals, EPA is uncertain of
 the source of the slightly ejevated levels of arsenic, but does not attribute them to the Osbome
 Landfill site.
 C.    Type of Contamination

 1. Comment: A citizen asked which wells were routinely tested for metals.

 Response: Two different Remedial Investigations examined metals in the aquifers.  The results
 of the investigations indicated that the metals were not migrating and so EPA eliminated metals
 as contaminants of concern in ground water at the site. However, the performance wells directly
 adjacent to the landfill still monitor for metals to be certain that conditions don't change.

 2. Comment: The citizen asked whether the Eickmann and Lazor wells were tested as part of
 the Remedial Investigations.

 Response: Yes, both the Eickmann and Lazor wells have been  sampled. The Lazor well has
 been sampled four times, and the  Eickmann well has been sampled at least seven times.


 D.    Residential Well Sampling

 1) Comment: A citizen asked why the Kring well was not tested after  vinyl chloride was
detected at 11 parts per billion in  the Eickmann well.

 Response: The Kring well was sampled four times and no contamination was detected.

2)  Comment: A citizen explained that she did not connect to public water because her well
had tested clean but  that she was told that her well  would be periodically tested and that she
could connect to public water if contamination  was detected.  Her well has not been tested for
two and a half years.

Response: EPA encouraged all residents on the perimeter of the site and in the direction of the
plume's eventual flow to connect  to public water.  EPA did not and legally could not make a
commitment to residents to periodically test their water indefinitely.  However, the well in
question is proposed for periodic testing as part of the current proposed clean-up plan.

3. Comment: A citizen asked whether EPA had determined which residential wells would be
monitored as part of the clean-up  plan.

The residential monitoring wells  are defined in this Record of Decision which contains
additional sampling of wells added after the public  meeting. The first round of sampling will
                                                                                       17

-------
test all residential wells that had previously been sampled by Cooper Industries and EPA. The
later rounds will continue sampling those residential wells previously sampled that have not
connected to the water line.

4. Comment: A citizen asked for a contact to ensure that the wells are monitored.

Response: Citizens should contact Mr. Frank Vavra, Remedial Project Manager, with questions
about residential well sampling under the proposed monitoring program.  Mr. Vavra can be
reached by mail at  841  Chestnut Street, Philadelphia, PA  19107; by telephone at (215) 566-
3221; or by e-mail at vavra-frank@epamail.epa.gov.

5. Comment: A citizen asked whether EPA would continue to test her well even though she
refused connection to public water.

Response:  This resident's well is included in EPA's monitoring program.

6. Comment:  Several citizens commented that more sampling is needed before EPA should
determine how to proceed.

Response:  EPA has conducted extensive sampling over several years and has noted a dramatic
decline in contaminant levels over time. EPA's data shows that the contaminant plume is
naturally degrading and shrinking. Additional sampling will be conducted to verify this
conclusion.  Some citizens recommended sweeping new investigation requirements that are
unwarranted given the consistently declining contaminant levels identified by the sampling
conducted to date.   The fastest way to get additional extensive sampling information was to
issue a ROD for monitored Natural Attenuation.  According to the law, if the sampling shows a
significant new problem(s), EPA would revisit this decision.

7. Comment: Several citizens stated that their wells were tested only once.

Response:  The majority of the residential  wells are sidegradient to the contaminant plume.
That is, they are next to the contaminant path, not on it.   In addition, all but one of the
residents on the perimeter of the landfill are connected to public water. The wells that were
only sampled once are generally those well farthest from the site that were checked even though
the probability of contamination was extremely low. These residents have a safe supply of
drinking  water.  Some of these residents' wells will be monitored as part of the clean-up plan to
ensure that the contamination in  the plume continues to degrade at current rates.  However,
continued monitoring of all of these residential wells, from a risk perspective, was not
necessary because they have a safe drinking water supply, as well as befog out of the path of
the contaminant plume.  Their wells will be checked in the first round of sampling under this
Record of Decision.

8. Comment: A citizen stated that sampling of residential wells was necessary before
proceeding because the  existing data is "old."

 Response: EPA's selected alternative will obtain sampling data on residential wells.

                                                                                       -~

-------
 9. Comment: A citizen requested that quarterly monitoring data for 1996 and 1997 be placed in
 the information repository

 Response: There is no quarterly monitoring data for  1996.  Quarterly monitoring data will be
 placed in the information repository as it becomes available, if the library is willing to accept it.


 E.    Slurry Wall/Containment Issues

 1. Comment: A citizen asked what testing EPA/Cooper Industries had conducted to ensure that
 the clay  layer was continuous under the entire containment area and was impermeable.

 Response: Cooper conducted test drilling approximately every hundred feed along  the slurry
 wall to detect mine voids and determine the existence and thickness of the clay  layer.

 2. Comment: The citizen asked whether any drilling was done  inside the containment area, in
 addition  to the testing along the edge.

 Response: Cooper installed extraction wells to create a negative pressure inside the containment
 area.  The negative pressure inside the containment area ensures that all water flows into the
 containment area and therefore, even if the bottom clay layer is missing in places,  no water can
 escape the containment area. Some wells were installed during the 1980's investigations  which
 have drilling logs that can be used to assess the existence of the clay layer. Cooper Industries
 evaluated all of the past data and concluded that the clay layer was present over most of the site
 except near the southeast area of the site where it was glaciated.  Regardless, EPA expected
 some clay to be missing. The inward hydraulic gradient created by the extraction wells was
 selected to deal with this problem.

3. Comment: The citizen  asked whether the standing water table is higher than the bottom of
 the containment area under all conditions so that the negative pressure inside the containment
area is always maintained.

 Response: Cooper installed well nests in the force walls around the containment area.  There
are three wells, called performance wells, in each well nest.  One is installed inside the
containment area to the depth of the clay layer.  Another is installed to the same depth outside
the containment area. A third is installed outside the containment area into the aquifer below
the clay layer. These wells are monitored to ensure that the water levels in the outside wells
are higher than the water level in the inside well and the negative pressure inside the
containment area is maintained. The typical standing water level outside the landfill is expected
to always be above the floor of the containment and is monitored.

4) Comment: The citizen asked whether the clay layer boring data are publicly available.

 Response: This is design data and is not normally sent to the repository. EPA mistakenly told
the public that the data was available  in the repository.  Very large volumes of data are
available in the EPA office on the  site that are not available in  the site repository.  EPA will
                                                                                         —

-------
 have Cooper Industries send a copy of the report containing this information to the site
 repository.

 5. Comment: A citizen asjced how long the site has been contained.

 Response: The source of site contamination has been contained in the slurry wall for
 approximately one year.

 6. Comment: A citizen asked whether continuous pumping of the extraction wells affects local
 aquifers or the mine system.

 Response: No. After treatment, the water is reinjected into the mine voids to maintain
 hydrostatic equilibrium.  The volume of the mine pool is huge compared to the water extracted
 and injected.

 7. Comment: Does EPA have a permit to discharge the treated water back into the mine voids.

 Response: Although, EPA does not need a permit to reinject the treated water.  With regard to
 the reinjection of treated water,  EPA is only required to follow state substantive  requirements
 such as contaminant levels, but not the procedural requirement of obtaining a permit.  PADEP
 did review both the ROD and the design documents for the containment and treatment plan.

 8. Comment: A citizen  asked about the rate of the extraction system?

 Response: The average  extraction rate is less than 30 gallons per minute.

 9. Comment: A citizen  asked whether the reinjection rate was about 30 gallons per minute as
 well?

 Response: Yes.

 10. Comment: A citizen asked what the total acreage of containment was at the site.

 Response: The total acreage of containment is about twelve acres.

 11. Comment: The citizen commented that the rate seemed high and questioned whether water
 from the mine voids was being pumped into the containment area to maintain that rate as it
 seemed too high for recharge from rainfall.

 Response: A small amount of water is coming through the cap and up through the bottom.
 However, this movement ensures that there is no migration out of the containment area. The
design specifications estimated that about 30  gallons per  minute would be needed to maintain
 the inward gradient, and nominally, that is what is being extracted and injected.
                                                                                       20

-------
 F.  Health Concerns

 1. Comment: A citizen commented that many people in the neighborhood have heart disease or
 cancer or have died.

 Response: The background cancer rates for citizens in the  the United States has been estimated
 at 30-40 percent.  EPA is cleaning up the Osbome Landfill Site as quickly as possible.  There
 are no known current users of the contaminated ground water. Potential exposure to the fill has
 been eliminated. The Agency for Toxic Substances and Disease Registry (ATSDR) is reviewing
 the health statistics  in the area.

 2. Comment: A citizen asked whether EPA will issue a widespread notice to Grove City
 residents that  the Clarion Aquifer  that it will not be safe for five years.

 Response: EPA has had periodic public meetings to discuss the site, fact sheets have been
 issued and numerous articles about the site have been published. Additionally, EPA believes the
 plume is contained within a relatively small area and does not believe that a widespread notice
 is appropriate. EPA will conduct an effort to inform residents who live near the site with fact
 sheets and other information.

 3. Comment: A citizen asked whether she/he could safely drink from the Clarion Aquifer at
 his/her residence right now.

 Response: Current data and understanding of ground water movement indicate that the Clarion
 Aquifer is safe at that location.

4. Comment:  A citizen commented that a health study should have been conducted recently.

 Response: The Agency  for Toxic Substances and Disease Registry (ATSDR), which monitors
EPA's investigations from a public health perspective, performed a health assessment of the site
area in 1991.  The document  is available at the Grove City Library. EPA received no letters,
phone calls or complaints from residents or their elected officials since 1991 about health
problems.  The ATSDR is now reviewing health statistics and will issue a report early next
year.

 G.    Other Issues

 1. Comment: A citizen asked where Cooper disposed  of their waste before the Osborne Site
was available.

Response: This question should be posed to Cooper Industries.  The company may have
records indicating where such waste was disposed. Mr. Weinzierl, a Cooper Industries
representative, indicated that he did not believe the company had such records but that he would
investigate. This is not an EPA responsibility to follow up on.
                                                                                       21

-------
2. Comment: A citizen asked whether Cooper's waste could have been disposed at the
Johnstown Foundry.

Response: Mr. Weinzierl,(Cooper Industries)  indicated that it was unlikely as the company
took core samples in the area and found nothing.

3. Comment: A citizen asked whether Cooper disposed of vinyl chloride anywhere else in the
area.

Response: Vinyl  chloride is a gas used in producing polyvinyl chloride (PVC), a type of
plastic.  It also is formed by the degradation of certain solvents.   It is highly improbable that
Cooper Industries disposed of vinyl chloride because it is a gas used by the plastics industry.

4. Comment: A citizen asked what EPA is doing to address concerns about the Tri-County site,
also associated with Cooper.

Response: EPA notified its Site Investigation  Section as well as Mr. Bob Kimbell of PADEP of
citizen concern about the Tri-County Landfill  after the concern was first raised.  The Tri-
County  Landfill currently is under the regulatory jurisdiction of PADEP and all questions and
concerns about the landfill should be addressed to PAOEP.

5. Comment: A citizen asked whether EPA can hold Cooper accountable for waste taken to the
Tri-County site.

Response: Currently, EPA is unaware of documented disposal of regulated hazardous waste at
the Tri-County site. Even if such evidence existed, this would still be the responsibility of the
PADEP.  EPA has no authority over solid  waste landfill facilities unless they are listed on the
National Priorities List.  Operating solid waste landfills are regulated in Pennsylvania by the
PADEP.  The same is true for operating hazardous waste landfills.  Congress developed the
Resource Conservation Recovery Act with  the goal of delegating RCRA's responsibilities for
the regulation of certain hazardous waste activities. Pennsylvania has been delegated this
authority. Thus, even if an incident of hazardous waste disposal  had  occurred at  the Tri-County
Landfill, the PADEP would  be the appropriate regulatory authority to address the issue.

6. Comment: A citizen complained about the quality of water - that it turns black with the
seasons and is corrosive.

Response: EPA believes the water quality  is caused  by naturally-occurring levels of iron and
manganese, not site contaminants. These levels of iron and manganese tire a problem in the
Homewood, Connoquenessing, and Burgoon aquifers in the area near the site. This resident is
located both upgradient  and  far from the site.

7. Comment: A citizen  asked whether collapsing land to the west of the site was related to the
site.

Response: EPA believes that the collapsing land near Grove City is unrelated to the site.  EPA

                                                                                       22

-------
 is reinjecting the treated water from the containment area back into the mine voids to ensure
 that the site cleanup does not have a subsidence effect on nearby residents.


 Part II Written Comments  Submitted  During The Public Meeting

 Hilda Kring

 Comment: Will EPA test my well?

 Response: EPA will  we test her well.  Answered in more detail in Part III.

 Unsigned Comment

 Comment: One resident commented that the earthworms on her property were not tested. The
 resident also commented that they believe that the injection wells could be spreading
 contaminants through mine tunnels. The resident also was concerned about high acidity and
 what the treated water is washing  out of the ground.

 Response: Earthworm testing was only conducted in the wetlands adjacent to  the site to
 determine if the very low level of PCBs, which was below EPA's cleanup standard, could be
 bioaccumulating in earthworms. PCBs entered the wetlands via surface water runoff. EPA has
 no reason to believe that PCBs from the site are present on any of the residential properties.

 Contaminant spreading through mine tunnels - addressed previously.

      The water that is injected into the mine pool is not acidic and is tested routinely.  After
the public meeting, EPA asked the PADEP to test the stream carrying runoff from the landfill
cover to see if the cover could be  creating acidic  surface water which  might leach into the
aquifer downgradient. The runoff water from the cap was slightly basic - not acidic.


Ann Stilwagon

Comment: My water turns black and eats away my pipe fixtures, enamel on washing machine
tub.  The resident believes that public water is even worse and they use bottled water. The
resident's animal has lumps,  her neighbor died of cancer.  The resident had a  stroke and
attributes all of the problems above due to the Osborne  Landfill Site.

Response:  The black water (manganese) has been addressed previously.   EPA received results
from the municipal water authority which shows that they are meeting all of the EPA's drinking
water standards. EPA believes that it is unlikely  that the health problems cited are related to
well contamination due to the Osborne Landfill. This resident lives a substantial  distance from
the landfill and EPA  considers her well to be upgradient.  Several  residential wells that are
between this resident and the site have not contained contamination when tested in 1993 and
 1994. This residents well was tested for volatile organic hydrocarbons in 1993 and no

                                                                                       —

-------
 contamination was detected.


 Part III Written  Comments Submitted  During The Comment Period

 Shirley Donan

 Comment: EPA resisted a slurry wall solution, but Cooper Industries prevailed and obtained a
 remedy which left waste in place.

 Response: The originally preferred alternative set forth in the Proposed Plan (onsite, lined
 landfill) would not have removed the waste, nor would the PADEP's preference (incineration
 and then placement in an onsite lined landfill) have removed the waste from the site.

       EPA was not  coerced into selecting a different alternative by Cooper Industries. The
 geological environment at this site is extremely complex, and there were daunting technical
 problems implementing any remedial action contemplated.  After Cooper Industries requested the
 opportunity to supply EPA with information supporting a slurry wall/Clay Cap containment,
 EPA formed a panel  of experts to review all of the site information and to give EPA its
 recommendations. The panel was composed of one expert from EPA's office of Research and
 Development,  and two prominent experts on slurry walls from the U.S. Army Corps of
 Engineers. This panel supported the  slurry wall solution suggested by Cooper Industries, and
 cautioned the EPA project manager against options involving excavation. They were concerned
 that even if the high wall was grouted closed and the excavation drained, the excavation of a
 large area adjacent to a large mine pool risked "blowing out" a wall and perhaps killing
 workers in the excavated area during construction.

       EPA partially selected the slurry wall in response to public comments expressed at the
 public meeting or received by mail in the Fall of 1989. In  1989, Cooper Industries was one of
the largest local employers. Many of the public attending  the meeting expressed doubt about
the risk from the Osbome Site and were concerned about the financial impact on Cooper
Industries. The majority of the public attending the public  meeting favored allowing Cooper
Industries to implement their proposed slurry wall remedial action.

Comment: That surrounding residents drank from wells at risk for 11  years before a water
main was offered to them in 1995.

 Response: Several investigations were conducted through the mid-1980te through the mid-1990s.
These investigations did not suggest that residential wells were at risk. During the  late  1980s
and afterwards, residents had municipal water available to  them to the north, west  and south of
the site.  Selected residential wells potentially at risk were sampled during the 1988 remedial
investigation and did not contain contamination. This was consistent with  EPA's understanding
of the site's hydrogeology.  During the supplemental focused Remedial Investigation, one and
only one residential well contained contamination. A more comprehensive residential well
sampling was conducted and no additional contaminated wells were found. At that time, Cooper
 Industries extended the municipal  water line so that the entire perimeter of the site has public

                                                                                      24

-------
 water available to the residents at risk. EPA's selected remedial action will provide substantial
 new sampling information which will partially address the concerns expressed at the public
 meeting.

 Comment:  Skepticism was expressed that the site contaminants are "cleaning up".  The
 commentor  was incredulous that vinyl chloride could drop from 10 ug/1 to less than 1 ppb in
 several  months.  Additionally, the commentor expressed concern that the decrease might be due
 to injection  of the treated water from the containment.

 Response: Several facts support EPA's belief that natural attenuation is occurring.  Vinyl
 chloride itself is not a solid waste contaminant. Vinyl chloride  boils at 7 degrees Fahrenheit,
 which means that at normal temperatures in Grove City, it is a gas. To EPA's knowledge.
 Cooper Industries did not use vinyl chloride in any of its operations. Typically only the plastics
 manufacturing industry uses vinyl chloride (to produce polyvinyl chloride (PVC) plastic). EPA
 believes that it is extremely unlikely that any vinyl chloride was disposed of at the Osborne
 Landfill.

       EPA often detects vinyl chloride at sites where trichloroethylene (TCE) solvent has been
 disposed into the subsurface. Trichloroethylene is a solvent which was used by dry cleaners and
 for metal degreasing until recently. This is one of the most common ground  water contaminants
 in EPA Region 3. At many sites TCE breaks down into the "daughter products"
 Dichloroethylene and vinyl chloride and finally ethene gas, by  sequentially losing a chlorine
 atom from the parent molecules. This can happen due to bacteria or to chemical reactions in the
 subsurface. The  final degradation product is ethene gas which is a harmless gas emitted by
 ripening fruit.  EPA believes that the vinyl chloride at the Osbome Landfill is the chemical
 "ghost" from substantial TCE contamination in the past. It will continue to degrade to ethene
gas. Also, some of the vinyl chloride will volatilize into the pore space of the soil and either
be degraded or dispersed in air at harmless concentrations.  Dilution and dispersion also reduces
the concentration of the vinyl chloride plume the further it travels from the source. The source
of contamination (the fill area) has been isolated from the Clarion Formation by the slurry wall
and an inward pressure gradient.

       EPA agrees that it is unlikely that the real aquifer stable concentrations would change
from  10 ppb to 0.75 ppb in a period  of several months.  However, EPA expects concentrations
to fluctuate over time due to many factors, but also to show a  general decline.  Lab
measurements at such low levels are  very difficult  and if the water sample is not taken carefully
 some volatilization can give erroneous low reported concentrations.  The current concentration
 in the Eickmann well is probably  fluctuating between  5 to 10 ppb currently, down from levels
between 10 to 16 ppb several years ago.

       Flow is generally to the southwest in the area of the mine pool, and the volume of the
mine pool is very  large. During the NUS investigation, a pump test in the mine voids at over
200 gpm failed to cause any drawdown.  All three injection wells only inject less than 30
gallons  per minute of treated water.  One injection well  is across the Pine Street near the
entrance to the water treatment plant and another is also far away from the Eickmann well to
the northwest. Only one well is close enough to potentially have an effect on concentrations in

                                                                                        —

-------
 the Eickmann well, and this well injects less than 9 gpm at that location.  EPA believes that it
 is unlikely that the decreased concentrations are due to the injection wells.  They are more
 likely due to changes in rainfall and resulting increased ground water flows, analytical
 variations or sample handling.

 Comment:  When the pumps are shut down in five years or less the citizens will be at  risk  from
 contamination which may migrate to a new area.

 Response: Long term ground water contamination from a source such as the Osbome Landfill
 does not generally "migrate" to new areas.  Typically, a ground water plume emanates from a
 waste source just as a smoke plume emanates from a fire.  A smoke plume is diluted as it
 mixes with air until at some distance it is no longer visible. At the peak of the  fire, the visible
 smoke extends the farthest from the fire. As the fire is exhausted, the smoke plume contracts
 and extends less far. As the fire dies and only embers are left, the smoke will only be visible
 very near the fire. During the 1970s, the Osborne ground water contamination plume probably
 extended much farther to the southeast than it  does today, and may even have extended into the
 Homewood, Connoquenessing and Burgeon Aquifers.  Since the landfill closed  in 1978, almost
 twenty years ago, EPA believes that the plume is contracting, not moving to new areas.  The
 selected remedy will monitor the plume to verify  that  the plume continues its decline.

 Comment: EPA should have called for a Health Assessment in 1993 because the Eickmann
 well was found to be contaminated.

 Response:  Expanded residential well sampling was conducted and only the Eickmann well was
 found to be contaminated. The additional  monitoring well sampling conducted  by CEC
 demonstrated that the plume was limited to cornfields adjacent to the site. No letters or phone
 calls from the public have been received regarding new health problems in the  area since the
 Proposed Plan in 1989.  In  1989, the public did express concern about health problems
 specifically brain cancers. Mr. Frank Vavra the project manager at that time contacted the
 ATSDR and requested their help assessing the situation. Their study did not reveal any
 problems attributable to the site.  Since cancer has a latency period of 20 to 30 years, since
 only one new known residential exposure had  occurred, since the plume was limited to the
cornfields adjacent to the site, and since EPA had received no letters  or phone  calls identifying
 individuals with health  problems in the area at risk, there was little reason to contact ATSDR.
 ATSDR is currently evaluating the new site information and will conduct interviews with
 residents. EPA is giving the ATSDR full cooperation and has supplied them with the primary
 site documents.

 Comment: EPA selected a  band aid solution and will soon shut down the remedy, stop the
 sparse sampling and  leave the community at great risk.

 Response: The remedial action for the landfill was a two year, multimillion dollar construction
project and is hardly a "band aid" solution. The waste has been contained by a slurry wall and
clay cap. The primary risk from the waste was direct contact which is prevented by the cap and
the fence. The slurry wall and leachate extraction system prevents the very low levels of
contamination in the fill area from moving into the ground water.  The contaminant
                                                                                      _.

-------
 concentrations in the leachate associated with the fill have dropped substantially, and are
 approaching federal drinking water standards. Ground water monitoring will continue for at
 least seven to ten years. A total of twenty one monitoring wells in the Clarion/Mine Void
 formation, six wells in the Jiomewood Formation and three wells in each of the deeper
 uncontaminated aquifers will be monitored.  Initially EPA will sample sixteen residential wells
 even though EPA believes that they are upgradient and  not at significant risk, and will continue
 periodic sampling of six residential wells. EPA disagrees that the monitoring is sparse  and
 considers  the monitoring program to be adequate.

 Comment: We need a public health survey in the area of the dump. We need permanent
 monitoring at a 1/4 mile perimeter or more around the dump.

 Response: The Agency for Toxic Substances and Disease Registry is reviewing the site data to
 determine what measures need to be. taken (if any)in addition to those planned by EPA.  EPA
 must use science to construct cost effective and technically adequate monitoring programs - not
 arbitrary programs based on a site radius.  EPA considers the source, the contaminants and the
 mechanisms of migration when it designs a monitoring program.  EPA believes that the
 monitoring program in its selected remedial action  for OU2 is adequate to protect the public.

 Comment: The Krings are downgradient, and have been using well water, swimming  in the
 strip mine pond with other members of the public,  and have  been a victim of neglect.
 According to Ms. Kring, her well has only been analyzed once in the past. Did the consultants
 give the pond a clean bill of health? Another resident suggested sampling  the entire water
 profile from top to bottom of the lake as well as sampling sediments for heavy  metals.

 Response: The Krings are not downgradient. Flow is to the southeast of the site in the mine
 pool and the Clarion Aquifer.  The Kring well has  been tested five times in the past: Once in
 1989, once in 1993 and three times  in 1994.  The Kring residence was one of the residential
 wells selected for additional monitoring in the Feasibility Study, the Proposed Plan and now the
 ROD.  Additionally, Cooper Industries offered the  Krings the opportunity to connect to a public
 water supply  which periodically tests for contaminants.  They have refused public water and
have indicated that they believe their well provides water of superior quality compared to the
public water supply.  The water in the strip mine pond was tested in 1989 and did not contain
site related contaminants (See Final  Feasibility Study dated December  1989). This does not
 surprise EPA at all. Since vinyl chloride is  at relatively low levels in the mine already, the mine
water entering the pond would be substantially diluted.  Additionally, vinyl chloride is so
volatile that it would leave the pond water and be further diluted in the air. Metals and other
 contaminants have not been shown to migrate from the fill area in to ttie area adjacent to the
 site, so it is very unlikely that they would be found in the pond which i  much farther away.  In
summary,  the Kring well has not contained contamination in the  past five sampling events, the
well is not downgradient of the plume, the  strip mine pond was sampled several times did not
contain contamination, their well will be tested periodically in the future and if they are
concerned about their water they may connect to the public water supply at Cooper Industries
expense.

Ann Stillwagon

                                                                                       —

-------
 Comment: One resident felt EPA spoke down to the residents because EPA explained what
 scientific notation was and many of the residents already understood the concept.

 Response: At public meetings, EPA tries to make sure that the presentation is understood by aU
 residents.  It is EPA's experience that some individuals at public meetings do not understand this
 concept.

 Comment: One resident complained that notification fliers were distributed the evening  of the
 meeting, and that some were found blowing around yards the next day. The resident implied
 that EPA distributed them late so that residents would not attend.

 Response: EPA at this site went well beyond  what is required by law, and what is usually done
 at Superfund Sites to encourage  residents to attend the meeting. EPA is  only required by law
 to publish a notice of the public meeting once in two local papers.  EPA published the notice of
 the meeting on August 6, 1997 in the Sharon Herald and the Allied News at the time  that the
 Proposed Plan was issued. An additional notice of the public meeting was published in the same
 papers several days before the public meeting  to remind residents of the meeting. The day  of
 the meeting, not the evening of the meeting, fliers were distributed to nearby residents to
 remind them of the meeting and to encourage  their attendance.

 Comment: One resident was disturbed that residents were only allowed to ask questions and
 make comments. They thought that EPA should basically take a vote at the public meeting  to
 determine what remedial alternative should be selected and implemented.

 Response: Although EPA does take concerns  of residents living near Superfund Sites very
 seriously,  the law does not allow residents  to select EPA's remedial actions at Superfund Sites.

       As explained in the Record of Decision, EPA's primary selection criteria are 1)
 Protection of Human Health and the Environment  2) Compliance with Environmental Laws 3)
 Long Term Effectiveness 4) Reduction of Toxicity, Mobility and Volume 5) Short Term
 Effectiveness 6) Implementability 7) Cost

       State Acceptance and Community Acceptance are modifying criteria and are given
significant consideration, but less weight than  the primary criteria.  If EPA can modify a
remedy to improve the acceptability of the remedy in response to community concerns,  it often
does.   In this case, EPA has increased the amount of residential well  monitoring in  response to
community concerns.

 Comment: The more definitive comments became, the more vague the ftPAs) answers
became. Many questions went unanswered. Statistics can be manipulated and those  presented at
the meeting are not valid.

 Response: EPA believes that very few questions went unanswered, although some residents
 may not have been satisfied with the degree of detail. EPA believes the assertion that some
answers were vague was based on several unrealistic expectations.
                                                                                      28

-------
       The purpose of a Proposed Plan public meeting is to present a general overview of the
 potential remedial actions to the public and to identify EPA's preferred alternative.  The details
 of the site investigations were sent to the administrative record. The three remedial
 investigations at the site spanned over ten years.  The files from the site would fill several file
 cabinets. Project managers also work on several sites simultaneously. It is unrealistic for
 residents to expect project managers to have memorized every detail about a site and to be able
 to quote those details at the public meeting.  EPA was generally able to furnish detailed
 information regarding the recent remedial investigation work.

       Some of the commentors seemed to demand that EPA demonstrate absolute and certain
 knowledge of all the details about how water moves through the mine system. It is unrealistic to
 expect that degree of knowledge of a subsurface system.  Furthermore, this degree of detail is
 also unnecessary.  The geology at the Osbome Site is complicated by the presence of mines  in
 the area, however, three extensive remedial investigations conducted at the site over more than
 ten years have given EPA an understanding of ground water movement at the site sufficient  to
 implement an effective remedy and to ensure that the public health and evironment are
 protected.  EPA generally understands the ground water flow in each of the aquifers and the
 extent of ground water contamination at the site. Past investigations have studied the regional
 flows of ground water in the Grove City  Area, which show flow directions consistent with
 EPA's interpretations of ground water flows onsite. Some residents and the consultant from  EEI
 Geophysical focused on the Eickmann well contamination.  They asserted that since EPA did not
 understand exactly how the Eickmann well  was contaminated, EPA did not understand the site
 well enough to make rational decisions.  EPA strongly disagrees with this assertion. EPA's past
 investigations have shown the  extent of the plume and the overall direction of ground  water
 flow.  EPA believes that this information, the relatively low and declining concentrations of
 vinyl chloride, and the monitoring  network  of wells  provide sufficient protection of the public.
 The  site risks were based on EPA's approved statistical methods and were reviewed by an EPA
 toxicologist.
Comment: One resident (Ms. Stillwagon) complained that her well was only tested one time in
1993 and that a scientific sampling would have required quarterly sampling.  Also, she was
informed that their well was clean, but the ditch water in front of their home was sampled
repeatedly over many weeks. Why was the ditch water so interesting if her well was
uncontaminated.

Response:  The Stillwagon residence is the farthest residence to the east sampled and is both
upgradient  and sidegradient to the ground water contaminant plume. The residence was only
sampled as a precaution after Cooper Industries discovered contamination in the Eickmann well.
There is no minimum number of samples for scientific sampling. Of course the more samples
taken, the greater the statistical confidence in the results.  There are numerous wells between
the Stillwagon residence and the plume. These wells were not contaminated  in 1993 and 1994
which gives EPA confidence that the plume did not extend to this area. Neither EPA nor
Cooper Industries ever sampled the ditch water in front of the Stillwagon residence. The ditch
water may  have been sampled by the state or local government for unrelated reasons.
                                                                                       29

-------
Comment: One resident stated that this was the first year that her water did not turn black and
attributed the change to the Osbome project. She was told by EPA that this was unrelated to the
site operations, but she remained skeptical that her water was unaffected by the site.

Response: The ground water in the Grove City area is high in iron and manganese. References
in EPA's library indicate that areas of the Homewood aquifer sometimes contain iron ore.
These areas can contain ground water with such high concentrations of iron and manganese that
if clear water is removed from the formation,  iron  and manganese will precipitate forming a
black scum on the water. When EPA discovered the contamination in the  Eickman well, Cooper
Industries attempted to drill a deeper well to provide the Eickmanns with  uncontaminated water.
The new well contained high levels of iron and proved to be unusable because the iron and
manganese precipitated in the toilets and sinks in his home. EPA believes the  "black water" in
the residents well is related to the high levels  of iron and manganese in the local formations.

Comment: One resident did not believe that EPA's "reasonable risk" addressed synergistic
effects over time from eating vegetables, deer in the past and other possible impacts other than
using ground water. Reasonable risk does not  address the financial loss of depreciated property
values and impacts from past exposures.

Response: This Plan addresses ground water and wetland sediments based on  current
contamination levels. Vinyl chloride does not  bioaccumulate in animals and plants.  EPA
believes that the only  current site risks are from the domestic use of ground water in or near the
cornfield to the east of the Site.  EPA agrees that health impacts from past contamination
exposure are possible, but are impossible to prove. The Superfund law does not provide
compensation for health impacts from Superfund Site exposures or for reimbursement of lost
property value.

Comment: The proposal to monitor the Osbome well sites and two other residences is not
enough. All the surrounding residences need to be sampled scientifically and informed of the
results.  Only after the results have been determined to be safe should the  plan be put in place.
Many residents in  the community want certainty, not EPA's best guess.

Response: EPA's  decision is based on a massive amount of high quality  comprehensive data -
not guesswork. However, EPA shares the commentor's concern for the surrounding residents
and will resample  all of the wells previously sampled for the first round of samples. Although
the residential sampling will be much less for the following sampling rounds,  some additional
residential wells have been added to the program.  Of course if the first round of sampling
showed sufficient reason to increase the scope of the residential well sampling, EPA would do
so.

Comment: One resident was concerned about statements made by the EPA project manager
regarding situations where he couldn't spend government money or that he would be
embarrassed if he  made the wrong decision.  The resident asserted that EPA showed too much
concern for economics and ignored the risk to the  public.

Response: The EPA project manager was merely pointing out to the public his limitations, and

                                                                                       30"

-------
 EPA's legal limitations regarding what can and cannot be done for the public. These limitation
 include compliance with EPA guidance, legal constraints and fiscal constraints.  For example,
 one resident supported by other residents thought that EPA should be willing to buy the homes
 of residents near the site if they wanted to sell. The project manager explained that this is not
 EPA policy and that Congress empowered EPA to remediate sites and to protect the public, but
 did not empower EPA to protect them from financial harm from Superfund Sites.  The project
 manager explained that the process from the  ROD to actually beginning remediation generally
 takes 3 to five years. One year to negotiate or order an agreement, two years to design a
 remedial action system, and one to two years to construct and approve a system. EPA believes
 that the contaminants will have declined to MCLs in five years, so,  if he selected pump
 treatment of ground water as the remedy the  site  might be clean by the time the remedial
 system was constructed. This could produce the embarrassing situation of constructing a system
 for millions of dollars and never using it.
Jane Scott Clearv- President of CEASRA

Comment: One resident commented that contrary to discussions in the public meeting, volumes
K and J were missing and volumes L,M, N,and O were not delivered until after the meeting.
The resident went to the meeting and was frustrated that recent well  monitoring data was not
available.

Response: EPA regrets  that volumes K and J were missing.  When an administrative record
update is delivered to a  library, it is accompanied by a form which should be filled out by the
librarian  and returned to EPA.  It documents that the update has been received and asks that
any missing volumes of the record be identified.  The librarian informed the EPA that she
returned the form with a note identifying the missing volumes. EPA's employee responsible for
maintaining the administrative record room in Philadelphia never received this form and the
EPA Project Manager was unaware of the problem.

       The key documents supporting the Record of Decision were present in the library at the
beginning of the comment period. The primary documents that EPA  makes its decision on are
the Remedial  Investigation Report, the Feasibility Study, and the Risk Assessment. The
Remedial Investigation contained several key reports as appendices, including the  entire
biological investigation report and the alternatives analysis report. The information contained in
volumes  L, M, N, and O were supplemental information that EPA added that was not integral
to the decision.  Regardless, EPA extended the comment period to allow the public additional
time to review this information.

Comment: One resident requested quarterly monitoring for at least one year for 20 additional
wells within a 2 mile  radius of the Osborne site, north, south, east, and  west. They requested
that all hazardous substances be monitored for in the first sampling event.  Any detected
contaminants  should be  tested for on subsequent sampling events. Residents on well water
within a three mile radius  should receive written notice of the statement that the Clarion
Aquifer will not be clean for five more years.
                                                                                       31

-------
 Response: Past investigations do not support the massive residential sampling effort requested
 by this resident. The site ground water has been sampled in every direction and in aJl of the
 relevant aquifers in the past for a wide array of contaminants. Additionally, the six performance
 wells nests adjacent to the.fill area sample monitoring wells in the Clarion and Homewood
 aquifers in all directions for a wide array of contaminants.  Current sampling of these
 performance wells do not indicate a semi-volatile or metals contaminant plume. The only
 contaminant plume identified by three past remedial investigation is limited to vinyl chloride
 and traces of other volatiles in the mine pool to the east of the site. EPA has revised the ROD
 so that virtually all of the residential wells that were tested in the past by Cooper Industries
 will be sampled in the first round of testing. After that event, the residential wells in this group
 that are still being  used for household purposes will be sampled annually until MCLs are met in
 the plume for five  years.  EPA also does not believe that the massive notification effort (all
 residents in a three mile radius) of Clarion Aquifer contamination is warranted. Public notice of
 the meeting has been  issued, local newspapers have recently published numerous articles about
 the site, and the contaminant plume is quite limited. EPA will conduct some public affairs
 efforts to make residents  near the site aware of the site status through fact sheets.

 Comment: One resident stated that when Eickmanns high 1995 level of vinyl chloride was
 omitted from the slide during the August 25th presentation, they lost confidence in the integrity
 of the presentation.

 Response: Due to  other conflicting work requirements, the public  meeting presentation was
 prepared with very limited time and was not as thorough and detailed as it should have been.
 There are numerous blueprints in EPA's files which show historic vinyl chloride concentrations.
 EPA constructed the slide from a blueprint Drawing 91187OU4-M1 dated 1/12/95. This
 blueprint did not contain the 1995 Eickmann well  result. This was simply an error and there
was no attempt to mislead the public or hide the data. In fact, the  1995 data was shown  in the
blueprint in the Feasibility Study which EPA had placed in the Administrative Record well
before the public meeting. At the public  meeting, EPA did not contend that vinyl chloride had
reached levels of one  ppb, and in fact stated that EPA would not be surprise to see the next
sample rebound to  higher levels, but that overall the average trend is downward.  The Record of
Decision contains a table  showing all available Eickmann well results.
Pat Brenner

Similar comments to other commentors - Sample Kring Pond, add additional residential well
sampling. Addressed elsewhere.

Hilda Kring

Requested additional residential well sampling. Addressed elsewhere.


EEI GEOPHYSICAL.CONSULTANTS
                                                                                       32

-------
 1) Comment: EPA's presentation made it clear that EPA has neither investigated the extent of
 contamination in the glacial tills west of the Site where heavy metals have been identified nor
 have you defined the extent of the contamination plume to the east of the Site.  It is clear that
 your work is based on studies completed eight years ago and that you have all but ingnored the
 heavy metals issues.

 Response: The Remedial Investigations conducted during the 1980's and completed in 1988,
 were thorough and studied the contamination in every media at the site. The Remedial Action
 selected in 1990 and constructed installed a slurry wall around the site and installed a clay cap
 which extended into the wetlands to the east. As a result, EPA had to construct an artificial
 wetlands to replace the wetlands covered by the cap. The wetlands were studied and did not
 contain contaminants at levels of concern. The wetlands samples were taken from an area that
 had  the highest probability of containing site contaminants because it received surface runoff
 from the site.  EPA concludes that there are no unsafe contact risks from contaminants to the
 east of the site.

       The ground water to the east of the site and in the overburden was also studied during
 the remedial investigations conducted during  the 1980s. These investigations analyzed ground
 water samples for the EPA target list of contaminants, including metals. Metals migration in
 ground water was not significant during these investigations, and EPA is not surprised by this
 fact. For example, even at highly contaminated lead sites, EPA often does not find significant
 lead contamination in ground water, unless the pH of  the ground water is unusually low.  The
 ground water at the Osbome Landfill  is basic or neutral at the site.  Disposal at the Osbome
 Landfill  ceased almost twenty years ago, and EPA would not expect the site geochemistry to
 change significantly.

       During the Remedial Investigation completed in 1995, nine wells were sampled for
 contaminants detected in the Homewood Aquifer during the extensive 1980s investigations
 (VOCs, pentachlorophenol, bis-(2-ethylhexyl)phthalate, lead and mercury). Additionally,  EPA
 placed six wells in the shallow aquifer on the perimeter of the slurry wall. These wells monitor
 for water levels and contaminant breakthroughs and are analyzed for metals. These wells have
 shown only sporadic detections of low levels of contaminants.

       It is true that the remedial action which has been constructed and which addresses soil
 and fill contamination is based on the investigations eight years ago. The cap covers the
contaminated areas which contained significant metals contamination. In 1989,  EPA issued a
 Proposed Plan, conducted a public meeting, accepted public comments on the Remedial
 Investigation, Risk Assessment and  Feasibility Study.  At the end of the Comment period, EPA
 addressed comments regarding the surface soil and fill at the Osborne Landfill. At this meeting,
 many if not most of the attendees expressed an opinion that the Osbome Landfill was not a risk
to the public and  that EPA was wasting money  investigating and cleaning up the site.
 Regardless of the opinions expressed at this meeting, EPA selected a protective remedy based
on policy and science. EPA is not  accepting additional comments on this remedy or the
 investigations leading to the remedy. EPA does not plan to conduct any further soil
 investigations for metals or any other contaminants.
                                                                                        33

-------
        It is untrue as explained above that the ground water decision is based on data that is
 eight years old. The supplementary Remedial Investigation fieldwork was completed in 1994
 and the final Remedial Investigation Report approved in January 1996. The more recent data
 supplemented the  extensive data generated during the 1980's, which defined the geology and
 ground water flow patterns, and identified the contaminants of concern in ground water. A
 regrettable lag occurred after the RJ because of limited resources and higher priority work on
 sites with higher risk levels. The Site investigations had revealed that risks to the public from
 ground water were low and most of the nearby residents were using the public water line
 installed by Cooper Industries. Nearby residents had been tested and except for the Eickman
 well the wells were "clean". Therefore, EPA's efforts concentrated on completing the
 construction of the primary remedy which was of greater benefit to the public.  The greatest
 realistic risk to the public was posed by children or adolescents coming in direct contact with
 the fill and this risk has been  eliminated by the completion of the cap.

        In 1989, EPA did not ignore the significant site risks even though the public sentiment
 appeared to be for No Action  or minimal action. Conversely, in 1997, EPA cannot justify the
 extensive resampling and expanded investigation of issues already adequately addressed.  In
 summary, EPA has not ignored metals issues, it has  thoroughly investigated the site and issued
 an appropriate and protective Record of Decision in  1990. The  ground water sampling program
 selected in this Record of Decision,  in conjunction with the ground water performance sampling
 required by the first operable unit, will adequately protect the public.

 2) Comment: EPA has failed to explain why the Kring well and pond, which EPA claims is
 fed from the same mine water as the Eickmann well only a few hundred feet away is one of the
 dirtiest. Understanding this relationship is critical to  defining the extent, direction of flow and
 content of the offsite contamination.  Without understanding the hydrologic conditions in the
 mine pool, EPA is unable to begin protecting the public health.  EPA reported that the water
 source for both sites is the mine pool and I believe you attribute the chemical difference to
 "preferential flow  paths" which EPA has not defined.  Since  this "preferential  flow path theory"
 was first postulated (without scientific support) it has become gospel.  I have reviewed all the
 data in the report  from which  this quote is taken and found no  substantiating evidence cited.  In
 fact, it is clear that this was the researchers guess at what was happening. What was presented
 as a guess becomes fact without research confirmation.

 Response: The preferential flow of water and contaminants in the  mine void system has been
 demonstrated by the chemical  data collected and pump test results, and is consistent with the
 type of mining that occurred in the vicinity of the Site. Understanding of the data used to
 support the presence of preferential flow paths explains how locations "only a few hundred
 feet" apart can have very different water quality values.

 The Brookville Coal beneath the area in question was deep mined  at an undetermined time
 before 1940.   The presence of flooded deep mine voids was confirmed by boring logs.
Although detailed  mine maps  are not available, mining was presumably performed by the room
and pillar method  which was typical for the region.  In this method, large haulage ways are cut,
then rooms are cut into the remainder of the mine. Pillars of coal are left in place to support the
overlying rock mass.  As mining progresses, entries  into exhausted areas may be blocked off to
                                                                                        _.

-------
 promote air circulation to the active face. In addition, retreat mining was often performed; in
 this practice, coal was removed from the pillars and the mine roof ultimately collapsed. After
 cessation of mining activities, further roof collapse would be expected.

       The labyrinth of tunnels clearly does not conduct ground water in the same manner as a
 porous medium of bedrock mass. Water will move freely through long open haulage ways.
 However stagnant conditions may occur in isolated rooms, or in collapsed or blocked tunnels.
 The historic flow dynamics were further complicated by the interaction between the onsite
 ponds, which occupied the cropline of the coal and collected runoff fro storm events. The
 increased water level in the ponds following storm events forced water into the mine voids,
 creating  a reversal of water flow in the mine voids during such events.

       The lack of interaction between various portions of the mine void was demonstrated by
 CECs pump test, described in Alternatives Analysis for Design Modification, Operable Unit 4,
 (1993). During this test, water quality in the pumping well showed clear geochemical evidence
 of the influx of water from the mine void. However, a tracer injected into the mine void at a
 well less than  five feet away was never detected in the pumping well.

       The existence of preferential flow paths is  clearly a natural consequence of deep mining
 beneath the site and is not conjecture, even though a direct link to the Eickmann well from the
 site has not been proven. Mapping of the mine openings and channels at the site and
 surrounding is technically infeasible because it would require the drilling hundreds or more
 borings,  which still  would not likely provide the sufficient data on the interconnection of all
 voids. EPA has placed enough wells to establish the rough extent of the plume. More
 importantly, EPA's sampling has established a band of clean wells to the east of the plume
 which defines  the extent of contamination.

 3) Comment: In addition to the uncertainly related to the well void system, your expert stated
 that reliability problems exist with the minimal sampling EPA has conducted.  Apparently, the
 sampling in several  wells under study was not completed under consistent conditions.  Your
 expert identified this problem at the public meeting, as being the primary cause of the reduction
 in VOL material  in  the Eickmann well over the course of the study.  Your sampling of this
 eastern area needs to be redone with constant conditions set for each sample site so that the data
 can be compared scientifically.

 Response: The sampling efforts conducted around the site since 1986  have been substantial.
 Many of the domestic wells were only sampled once during a very extensive sampling effort.
 Most of these  wells were not resampled because they were clean and the extent of
 contamination was adequately defined. Sampling of the Eickmann well ftas continued even
though this well is no longer active.  Even though the removal of this well from active use
constitutes a change in conditions, this change is likely significant in terms of water quality. A
typical domestic well withdraws only a couple of  hundred gallons per day of water and does
not develop a substantial capture zone. Termination of its use has not had a substantial impact
on the hydrogeologic regime in this area.

4) Comment:  I am deeply concerned that EPA presented a chart on the Eickmann well

-------
contamination that made the public think your cleanup is working. While in fact, subsequent
questioning revealed that later samples, those showing low contaminants were taken under
significantly different conditions than the early samples. In addition, your consultant admitted
that these low readings were the result of the Eickmann well not being pumped regularly as it
was prior to the latest sampling. Lastly, the Eickmann well chart presented to the public did not
present a data point taken during May 1995 (11 ppb) which showed an upward trend.

Response: The commentor inaccurately characterizes the CEC consultant's remarks by using
the term "admitted" which implies that EPA and Cooper Industries were trying to conceal the
fact that the Eickmann well was no longer  used. In fact, Cooper's consultant freely offered this
information at the public meeting.  The CEC consultant explained that part of the decrease may
be due to the fact that the well has been shut down and that the well might have been drawing
contamination to the well from the voids when it was used. The commentor suggested installing
a new well in the mine void at this location. A mine void monitoring well was previously
placed about  100 yards northeast from the  Eickmann well and has not shown contamination.
EPA and Cooper Industries try not to cause unwarranted problems for residents. Well locations
are limited to  locations where EPA can obtain permission to place monitoring wells, unless
some compelling reason exists for a particular placement. EPA did not compell the Eickmanns
to allow the installation of a void monitoring well on their property. The chart showing the
Eickann well data should have contained the May 1997 data point. This issue is discussed in
more detail above in EPA's response to Ms. Cleary.

5) Comment: EPA was fond of hedging its answers and referring the commentor to other
reports and information.

Response: The commentor states on page  1, paragraph 3 of his comments: "After reviewing  the
reams of data...". The  data he reviewed was only a small portion of all of the site related data
available in the EPA office. In the face of this massive amount of information, it is unrealistic
to expect EPA representatives to recall exact facts regarding information that had been gathered
over the last ten years.  This commentor also unrealistically demanded absolute answers,
although good environmental science can only give probabilities. When asked for absolute
answers, a scientist or engineer should qualify their answers even if the data are strong enough
to support a decision. The purpose  of the public meeting is to give the public a  summary of the
information, to answer general questions about the site and EPA's preferences and to direct the
public to the administrative record for detailed information.  Highly detailed technical questions
are more appropriately answered in the Responsiveness  Summary, so that accurate responses
can be supplied rather that relying on memory.

6) Comment: During the meeting you presented  inaccurate cross-sectioaal information which
did not  match the diagrams you have previously published in your Proposed Plan or for the
NUS report of 1989. The consultant that presented these erroneous diagrams admitted his error
when I questioned the diagrams accuracy at the meeting. I have since referred to the original
work prepared by NUS  in 1988 and 1989 and I found further discrepancies between your cross
sections as presented in the meeting, the version published on page 7 of EPA's  Proposed Plan
of August 1997 and the NUS report figure 3.5.
                                                                                       36

-------
 In the NUS report, cross-section locations are shown on page 43 of volume 1.  Review of these
 sections reveals that they are hedge diagrams not cross sections. The are however, drawn and
 presented as cross-sections on several pages following page 43. This creates an inaccurate
 representation of things such as dip, strike and ground water flow. These sections need to be
 redrawn and all conclusions made from them revisited. An example of this problem is presented
 in section A.

 Response: Apparently, the author is expressing concern over the bends in the cross sections
 presented. Although cross sections  for regional studies are typically straight lines oriented along
 strike or along dip, sections prepared for detailed, site-specific studies based on boring logs are
 commonly bent so that the sections can pass directly through boring locations.  This is the
 standard practice in industry, and is done for the increased level of accuracy and adherence to
 actual data collected. Conclusions concerning strike,dip and ground water flow direction are not
 drawn from these  cross sections, but rather from the full three dimensional database for the site.
 The sections are presented to display the data, not to facilitate quantitative data analysis. Since
 the section lines are clearly shown  in the  report, there should be no misconceptions about the
 meanings of these sections. EPA's  technical reviewers have had no problems interpreting these
 drawings and EPA does not plan to revise these drawing or revisit past conclusions because of
 this comment.

 The cross section presented as Figure 2 of the August 1997 EPA fact sheet is clearly
 generalized and simplified to be understandable to the general  public. The general nature of the
 drawing is emphasized by the lack  of section-location map, absence of any specific boring logs
 on the section, and lack of a horizontal scale. This figure was never intended  to be a detailed
 technical drawing  for data analysis purposes, but is  rather  intended to illustrated the relative
 position of the features of interest.

 7) Comment: Cross-section B (hedge Diagram  B)  is nearly a  straight line or true cross section
 of the site. Line D is also nearly straight so it is close to being a cross-section.  These two lines
 are more accurate  in displaying  the site conditions than  is  line A.

 By using "Cross-section B" presented on page 45 of their  report and comparing it to the cross-
 sections you have  published for public consumption, we can see in you August report and your
 public meeting cross-sections are misleading in  the  following ways:

       A. Foundry sand, one of the principal potential contaminants identified at  the site, is
 shown in NUS section B-B' as being in direct contact with the Clarion sandstones at LW-3  and
 it is  shown penetrating the Clarion Unit just west of LW-3. This is significant  since your
 ground  water P-surface is located at an elevation 1286'  in hole LW-3 ami the coal is at
elevation 1260'  feet. This places the Brookville coal and mine voids below the
Clarion/Contaminant interface in cross-section B-B. Geologicly there is no aquitard located
between the Clarion sandstone and the foundry  sand or between the sandstone and the
contaminated water sitting in the old strip pit. Additionally, the mine void is shown as
 underlying the foundry sand in an area west of LW-3 extending nearly to well MWH-4. Here
again no seal exists to prevent water from entering  the mine. This is significantly different that
the situation presented in  the drawings presented to the public at last weeks meeting or in the

                                                                                         37

-------
August Proposed Plan documents.

       B. Subsidence was found to be causing the intermingling of waters in the mine void and
the Clarion Sandstone in some areas of the site. It is therefore important to realize that the
underlying voids may present a leakage threat to your containment vessel's integrity. Your
vessel can only work if the mine voids and all sandstones are sealed by the Brookville fire clay
and if they are isolated from the world by the constructed walls. It is not clear that this can be
done  at this site due to the lack of sealing clay and mine subsidence issues.

       C. Other sections of the NUS report detail this interelationship, so it is reasonable to
conclude that the Clarion is hydrologically linked to the mine void under the foundry sand
deposited at this site. This causes a potential problem for your grout wall containment system
since to be effective in preventing  leakage it must seal and isolate the contaminants from the
Clarion sand and the mine works at a depth of 50 or more feet. In addition, the grout wall will
only work if the underclay is intact under the entire area being contained. Was this sealing
accomplished and are as built drawings available? Did you confirm this sealing in any way?

       D. The NUS report on page 48 states that it is uncertain that the underclay is continuous
under the strip mine area. Further it identifies the clay as ranging  from 0.01 thick  to nine feet
thick  in test borings made at the site. At the public meeting, your consultant admitted that the
Brookville underclay was not continuous across the site. If this is  the case, your containment
plan is doomed to failure when you terminate pumping of the contained area.

Response: As explained previously, the slide "cross-section" was just a simplified site depiction
to show the locations of the site features.

       A. EPA was fully aware that waste was in communication with the mine voids when the
Record of Decision was issued. EPA was also fully aware of the complexities of cleaning up a
site in communication with a mine pool. At some sites involving mined areas,  the presence of
mines has been the basis for a waiver of cleanup standards because of the difficulty addressing
contamination in  mines.  As explained in EPA's response to Ms. Donan above, EPA convened
a panel of slurry  wall experts to review this proposal. Additionally, the U.S. Army Corps
(USACE)of Engineers assign specialists in each are to review and comment on all aspects and
stages of the Remedial Design.  To assure that a quality installation was performed at this
difficult site, EPA required virtually full time supervision by the U.S. Army Corps of Engineers
for all critical parts of the project,  including the  bulkheading of the mine system. The USACE
had their own trailer at the site and was responsible for  verifying that the design was followed
and the remedy properly constructed.

       B. and C. The mine  voids  were sealed on the eastern side of the  site by injection grout.
At one point during the design, the USACE raised the potential for subsidence to  damage the
wall.  In response to this concern, the bulkhead was made wider to protect the wall from the
influence of subsidence.  The slurry wall was then constructed through the grouted bulkhead.
Calculations performed by Civil and Environmental Consultants showed that subsidence
adjacent to the bulkhead would not harm the wall and these calculations were reviewed and
approved by the USACE. If the bulkhead had not sealed the mine system, slurry would have
                                                                                        _

-------
 quickly drained from the slurry trench during installation along the east side of the containment.
 The slurry wall was installed around the entire perimeter of the waste encompassing the fill,
 including the foundry sand at location LW-3, substantially restricting communication between
 the waste inside the containment and  the Clarion aquifer/mine  voids outside of the slurry wall.

       During  the Remedial Action "kickoff" meeting held in  Grove City in 1995, several
 individuals asked if the township officials had the remedial design. At that time, the remedial
 design had not been requested or supplied to the township officials.  The entire Remedial
 Design was given to the Township following the meeting and  is available for review. The
 design has not  been placed in the administrative record. The remedial design is not normally
 placed in the administrative record or the site repository. If citizens request it, and if the library
 will accept it, a copy could be added. The "As Built" drawings are part of a Remedial Action
 Report that is currently under review  by the USAGE.

       D. EPA issued the Record of Decision for the slurry wall containment with full
 recognition that clay might be missing from some areas of the containment.  In fact, it was one
 of the primary  reasons that extraction wells were installed inside the  containment. The purpose
 of the extraction wells is to lower the water level inside the containment below the levels in the
 adjacent  aquifers, so that if a part of the containment isn't restricting flow, the water will leak
 into the containment instead of leaking out. If the system has large leaks, Cooper Industries
 would just need to treat more water raising the costs of their remedial action. The treated water
 is then reinjected into the mine system. This was a strong incentive for Cooper Industries to
 maintain quality during construction.

       Missing clay will not "doom"  the remedial action to failure. Prior to the Record of
 Decision, EPA  actually considered placing a soil cover over the site instead of an impermeable
 cap. Water leaching or leaking into the containment will flush contaminants from the fill more
 rapidly and these will be collected by the extraction wells and treated.  As long as an  inward
 gradient  is maintained, contaminants will not leave the containment. The extraction  wells will
 not be shut off until the fill presents no threat to ground water. The cap, slurry wall and soil
 cover will substantially  reduce leaching even after the extraction wells have been closed.

8) Comment: I believe the drawing on page 7 of your August report is misleading  to the public
and inaccurate. I request that new drawings be prepared for public review and that the
 inadequacies of NUS fence diagrams  be fixed to conform to industry standards for cross
 sections.

 Response: EPA has previously explained that the drawing on  page 7 was a simplified
 illustration to show site features. Additionally, EPA has already explained why no modifications
of the figures are needed.

9) Comment: At the meeting, I asked which way the ground water would flow from the site,
and you  indicated that it would flow toward the southeast at a bearing of around 160 degrees.
This conforms  with the drawings presented in the NUS report. However, closer inspection of
the  NUS report does not reveal springs or resurgence large enough to account for 23 gallons per
minute of injected water let alone natural ground water flow. Could you locate on a map the

                                                                                        _

-------
 exact location where all ground water within 1/4 mile of the site emerges and provide evidence
 for this data.

 Response: The  presence of springs is not an indication of the direction of ground water flow.
 Springs can occur when tfie water table intersects the ground surface, allowing ground water to
 discharge. However, ground water discharge can also occur as base flow to surface water
 bodies, diffuse discharge to wet areas, and evapotranspiration. The wetlands adjoining the site
 and Swamp Run are important ground water discharge areas. The relatively  small amount of
 water will enter the normal ground water flow system of the extensive mine pool without
 causing significant changes to flow direction or rate.

 10 Comment: In reviewing your ground water maps I noted that the Overburden Potentiometric
 Map presented on page 56 of the NUS report utilizes the elevation of the surface pond or
 glacial lake as the ground water elevation in the northwest end of the study  area. It also seems
 to use the surface elevation as opposed to actual ground water elevations in  making this map.  Is
 it your intent to claim that this map represents the ground water P surface at this site? This
 seems to  be an incorrect use of the hydrologic data. In referring to drill hole data, I find ground
 water was encountered at elevations more consistent with  the mine void elevation throughout
 the spoil and glacial till.

 Response: Page 3-9 on page 57 of the NUS report depicts the potentiometric surface based on
 monitoring points completed in the overburden. In that case, the potentiometric surface is the
 water table. The water table in the pond is included because the pond represents a ground
 water exposure in direct hydraulic communication with the overburden. In humid areas, such as
 the eastern United States, surface water bodies are usually exposures of the water table and are
 therefore  used to augment well data on water table-maps.

 The tendency  for water-table contour lines to mimic topographic contours is also common for
 the eastern United States. Examination of the values associated with these contour lines shows
 they represent values which are 15  to 20 feet below grade. Clearly these lines are not surface-
elevation  contours.

It is unclear which  test data was reviewed, but water levels from uncased boreholes are not
appropriate for construction of potentiometric-surface maps. Monitoring wells are designed to
determine conditions in vertically isolated intervals, while test borings measure water level
which is a permeability-weighted average head along the length of the borehole. When the
borehole encounters a mine void (a unit of virtually infinite permeability), the water level will
be the  hydraulic head in the mine void, and will not represent the position of the water table or
the hydraulic head  in any of the overlying strata. Section 4.1 of the  Alternatives Analysis  for
Design Modification. Operable Unit 4 discusses the vertical gradient between the Clarion
sandstone and the underlying mine  void, and indicates that the area east of the  site is dominated
by downward  vertical gradients. That means the water table occurs at a higher  elevation than
the potentiometric surface on the mine void.

 11) Comment: In addition, well MB1, located west of the strip mine spoil pile found ground
water at 1245  feet.  This elevation is consistent with the 14 feet per mile stratigraphic dip (0.15

                                                                           .             _

-------
 degree) to the southwest identified on page 39 of the NUS report. Page 59 of the NUS report
 seems to indicate that ground water flow is to the southwest into the spoil area. Further, 8 gpm
 are indicated as escaping into the spoil overburden in one of the studies. It is also clear that
 discharge of the water from the dump occurred into the swamp southwest of the site and that it
 carried contaminants with it. I see no effort on EPA's part to define the spread of heavy metals
 in the till in this area.

       My question is if the dip is to the southwest from the site and the contaminated soils
 were found southwest of the site why was so little effort made to delineate any metal
 contamination areas west of the site? Further please address the obvious inconsistencies in your
 ground water flow statements and geologic data collected in drilling.

 Response: Your comment states "contaminated soils were  found southwest of the site".  We
 assume you are referring to  the presence of black foundry  sand found in sediments southwest of
 the site. Laboratory analysis of sediment samples collected detected Aroclor 1254 (less than 1
 ppm which is EPA's cleanup level) and polynuclear aromatic hydrocarbons (PAH).  Analysis of
 surface water samples did not detect any contamination. The focused remedial investigation of
 the wetland included a bioassay and bioaccumulation study. The bioassay concluded site
 contaminants using interstitial water obtained from the sediments have not measurably impacted
 the wetland. The bioaccumulation study concluded that Aroclor 1254  is not measurably
 affecting/accumulating in the wetland food chain.

       There are no inconsistencies between the interpretation of ground water flow and
 geologic  data.  Although it is a common misconception that ground water flow must  parallel dip
 direction, this is untrue.  Ground water flows from areas of recharge to discharge. In shallow
 aquifers,  this pattern most resembles surface drainage in  a  subdued fashion. The upland area
 west of the site prevents ground water from flowing further to the west.  During  the  1988
 Remedial Investigation, EPA had wells placed in the overburden to the west of the site and did
 not see significant metals migration from the site. The pathway of concern for metals migration
 to the west of the site was surface water runoff not ground water flow.

       EPA did test sediments for chemical contamination in the wetland that received the most
 runoff from the site for chemicals and for biological effects. The results showed no significant
 impact on the wetland. The  wetland area most likely to receive contaminants from runoff is
 now under the cap system. Additionally, the spoil areas to  west of the site were  regraded for the
 landfill and most of those soils are now under the cap system. Much of the area west of the site
 was regraded and the elevation lowered to create the replacement wetlands. Excess soil was also
 placed under the cap.  This wetland area has been seeded and a healthy vegetated cover
established limiting soil contact. Additionally, EPA would  like to point -But that  while the onsite
soils were contaminated enough to require action, the average risk from systemic and
carcinogenic effects in onsite soils was actually below EPA's action levels.  The worst case
 systemic  effects and carcinogenic effects did far exceed EPA's action levels, but the samples
with this high risk were from subsurface boring samples.

       In summary, it is extremely unlikely that  runoff could  raise contaminant  levels to the
west of the site above EPA's action levels. This obvious conclusion is supported by EPA's

                                                                                        —

-------
 sampling results during the most recent investigation.

 12) Comment: EPA used the term preferential flow path to explain the Eickmann well.
 Research on this statement took me to page 5 of the NUS report where the author speculated
 with out foundation about'preferential flow paths. He did not present data to substantiate this
 theory. Would you please do this since it is a critical part of your hydrogeologic interpolation
 for the site. As you recall, I asked you at the meeting to define how you determined
 preferential flow paths existed under the Eickmann well.  Please do this for me using scientific
 data.

       Thirdly if preferential ground water flow paths, are carrying concentrated or higher
 levels  of contaminants, and if they exist under the field east of the site, would it not be critical
 to identify all  such paths with drilling prior to declaring the site clean?

       Also please define how your injection of 23 gpm  of treated water will affect the waters
 in these flow paths. What are the expected migration rates and what is the expected  flow path
 of mine waters during injection. Won't these contaminated waters be forced  further along their
 preferential flow paths by the water you are injecting? Won't this in effect move the plume
 outward into uncontaminated areas and outside of the sampled areas?

 Response: A great deal of investigation has taken place since preparation of the NUS  Report in
 1989. The current understanding of ground water flow is discussed in Alternatives Analysis. As
 discussed earlier,  the preferred flow pathways are related to the layout and condition of
 abandoned mine workings. The existence of these workings has been confirmed by drilling, and
 the general pattern can be inferred from the  history of mining  in Western Pennsylvania.
 However, no comprehensive accurate maps of these workings are available, and even if maps
 could be reviewed, they would not provide accurate information on the current condition of the
mine voids. Drilling data could be acquired, but this effort could require hundreds or more
 boreholes and  would indicate only the locations of open voids. This would furnish little
 information about the interconnection between one location and another.  The detailed scientific
data which the author requests cannot be acquired.

       However,  it is clear that- whatever preferential paths exist - they can only carry water
downgradient. The hydraulic gradient in the mine voids is to the southwest.  The injection  of 20
 gpm of water  into a unit of nearly infinite conductivity will  not raise the potentiometric surface
enough to change  the ground water flow direction. Injection, therefore, does not affect the
 pattern of ground  water flow and does not cause the movement of contaminants against  the
 natural direction of flow.  Historic eastward components of flow were related to stormwater
 accumulation in the on-site ponds. These have been removed and stormttater has been routed to
 a stream, so the potential for such flow reversals in the future  has been mitigated.

 13)Comment: You appear to have failed to design a plan which could track the migration of
contaminants eastward out of your study area during the injection of water into the mine pool.
 Is it your theory that as long as the wells test clean that the  site is clean? Have you prepared a
plan to deal with  contaminated mine waters being forced from the site to undefined discharge
 points  or to people's wells outside your monitoring  area?

                                                                                        42

-------
 Response: As previously explained, ground water flow in the mine pool is toward the
 southeast. Pumping huge amounts of water in the mine void failed to show any decrease in
 water level in the mine void.  Regional drainage is also to the southeast.  EPA does not believe
 that the mine void flows will be substantially affected  by the relatively small quantities (less
 than 9 gpm)  at each well location. However, the water that is injected into the mine voids has
 been treated  to below MCLs for contaminants.  If hypothetically, the injected water moved the
 flow somewhat further east as it moves toward  the southeast, the only resident not using public
 water and in the potential path of the  Eickmann contamination is the Kring residence. EPA
 plans to sample this residence, and will also obtain additional water level data which EPA
 believes will verify that no easterly gradient has been created. EPA believes that the well
 network outlined in the Record of Decision is adequate to monitor the plume from the site.

 14) Comment: Conclusions -  This project and  its reports are fraught with technical errors and
 unsubstantiated assumptions. More work needs  to be done before this ROD and cleanup project
 are completed. Geologic and hydrologic data need to be gathered west of the Glacial Till and
 east of the site beyond the limits of the current study. Further the final discharge point for all
 affected mine waters should be located and sampled during treatment. Dye tracing with
 Rodimine dye may help in defining flow paths  underground.

 Response: EPA believes that the  above comment is both inaccurate and is contradicted by the
 existing record.  EPA's previous responses address the comments which lead the reviewer to the
 above conclusion. Three investigations have produced data which is fully adequate to support
 the Natural Attenuation Record of Decision for Site ground water.  The presence of the water
 line and the monitoring program, in conjunction with the source control remedial action from.
 the first record of decision provide substantial protection to the public. EPA gathered  substantial
and sufficient information about the ground water in the glacial till to the  west of the site
during the 1989 Remedial Investigation. As explained previously, EPA does not believe that
dye tracing would be effective or that it is needed in this Site setting. Also explained
previously, the ultimate discharge point does not need  to be located and might be impossible to
define if ground water travels  for miles before discharging.  However the  ultimate discharge
point is to regional drainage to the south as described in the first Remedial Investigation
completed by Cooper Industries.
                                                                                        43

-------