FY-76 REGIONAL PROGRAM
     OPERATING PLANS
      END-OF-YEAR REPORT
                 PRO
             Prepared by
   Office of Planning and Managemen
  ENVIRONMENTAL PROTECTION AGENCY

-------
                FY-76 REGIONAL PROGRAM OPERATING PLANS

                          END-OF-YEAR REPORT


     The data/information contained in this report was collected through
the Formal Planning and Reporting System as of September 30, 1976.  All
analytical material was prepared by the Program Reporting Division and
coordinated with each of the Regional and Headquarters Program Offices.

     Comments concerning any material contained herein should be
addressed to:

                              Director
                              Program Reporting Division (PM-227)
                              U. S. Environmental Protection Agency
                              Waterside Mall, Room 2838
                              Washington, D. C..X-N 20460
NOVEMBER 1, 1976                      /  /
                                     /  .FREDERICK V.  LILLY,  II

-------
                                 PREFACE
     The FY-76 Regional Program Operating Plans—End-of-Year Report contains a
national overview and Regionally-specific highlights of  the status of achieved
goals versus obligated commitments in the Agency's  Management-by-Objectives (MBO)
System.

     The national and Regional overview narratives  are based on an analysis of levels
of achievement of 92 output commitments that  were monitored through the Agency's
Formal Reporting System (FRS).  The 30 graphs and charts that follow each overview
reflect status of either individual MBO outputs  or  combinations of these outputs to
indicate accomplishments and trends in the Agency's major program areas.

     In FY-76, there were 5 MBO outputs that,  through no fault of the Regional
Offices, the levels committed to could not be achieved.  This occurred for reasons
such as late issuance of regulations or unclear  definitions.  These outputs are
listed below, and they were not included in the  analysis of the Regional Offices'
accomplishments:

          Water 5b — Underground Injection Control (UIC) Grants Awarded

          Water 5c — States Applying for NPDWR  Primacy

          Water 5d — States Applying for UIC Primacy

         *Water 13 — Adjudicatory Hearings

          Pesticides 3Ba — Experimental Use  Permit Programs

     *Quantification of output not clear to all  Regions.

     The outputs selected for the graphs and  charts were outputs which had
significant national impact during the FY-76  plan year.  The Office of Planning and
Management recognizes that each Region would  have some outputs which are more
significant than those selected and addressed in this report.   In addition,  some

-------
key Agency outputs were not selected because data validating was considered low in
some cases.  This report makes no attempt to rank the Regions in any order reflecting
best or worst performance.  Rather, each individual output is addressed on a national
versus individual Regional basis.

     The report contains 3 sections:  the national overview and graphics, the 10
Regional overviews and graphics,  and an appendix, which includes end-of-year data
for all outputs and activity indicators in the MBO Formal Reporting System for
1976.

-------
INDEX

-------
Water 1
Water 2

Water 3A
Water 3B
                END-OF-YEAR REPORT

         Index of National  g Regional Graphs


Municipal Facilities Program Management

Number of Construction Grant Awards

Dollar Value of Construction Grant Awards (Millions)

State Program Delegations

NPDES Permit Issuance and Compliance (Nonmunicipal)

Percent of Major Nonmunicipal Permittees in Compliance with
Schedules

Reconnaissance Inspections of Major (Nonmunicipal) Permittees
by EPA and States

Sampling Inspections of Major (Nonmunicipal) Permittees by
EPA and States

Number of EPA Nonmunicipal Enforcement Actions

NPDES Permit Issuance and Compliance (Municipal)

Percent of Major Municipal Permittees in Compliance with
Schedules

Reconnaissance Inspections of Major (Municipal) Permittees by
EPA and States

Sampling Inspections of Major (Municipal) Permittees by EPA
and States

Number of 0§M Inspections of Major Municipal Permittees--
EPA and States

Number of EPA Municipal Enforcement Actions
                                                                                         National  S  Regional
                                                                                               Page No.
1

2

3
                                                                                                   4


                                                                                                   5


                                                                                                   6

                                                                                                   7
                                                                                                   8


                                                                                                   9


                                                                                                  10


                                                                                                  11

                                                                                                  12

-------
                                                                                         National f, Regional
                                                                                               Page No.
Water 3C
Water 4A
Water 5
Water 6
Water 7

Water 9

Air 2C

Air 3A
Air 3B $ 6A
NPDES Permit Issuance and Compliance (Federal Facilities)
Number  of Federal Facility Operations  Examined  for Compliance
With Permit Provisions
Preparation of EISs and Negative Declarations for EPA's
Waste Water Treatment Plant Construction Grants
Number of Final EISs Filed with CEQ on Construction Grants
Water Supply
Section 208--Water Quality Management Planning
Water Spill Prevention and Control
Number of SPCC Plan Compliance/Implementation Inspections
State Monitoring Programs:  Quality Assurance
Number of State Laboratories Evaluated
Assure Compliance with Fuel'Additive Regulations
Number of Gas Samples Tested by Field/Laboratory Method
Ensure Continued Compliance with SIP Requirements in Each State
Number of Identified Point Sources in Compliance with Final
Emission Requirements
Number of Identified Point Sources out of Compliance with
Final Emission Requirements not on Schedule
Anticipated Number of Enforcement Actions by EPA by State
Delegation of NSPS and NESHAPS
                                                                                                   13
14
15
16

17

18

19
•20

21
22
23

-------
Air 7
Pesticides 1
Pesticides 2A  -
Pesticides 2C  -
Solid Waste 1
Radiation 1
Ensure Compliance of Federal Facilities with SIP Requirements

Number of Federal Point Sources in Compliance with SIPs

Number of Federal Point Sources out of Compliance with SIPs

Establish Operational State Certification Programs

Number of State Section 4 Certification Plans Approved

Ensure Proper Use -and Application of Pesticides

Number of Use and Reentry Investigations Conducted

Continue Effective Regional Focus on Industry Compliance
with Registration Requirements

Number of Producer Establishments Inspected

Develop and Implement Complementary State and Federal
Strategies to Upgrade State Solid Waste Programs

Number of State Strategies for Control of Disposal Sites

Support the Development of State Emergency Response Plans

Number of Emergency Response Plans Completed
                                                                                          National § Regional
                                                                                               Page No.
24

25



26



27
                                                                                                  28
                                                                                                  29
                                                                                                  30

-------
OVERVIEW

-------
        END-OF-YEAR  REPORT- -NATIONAL OVERVIEW
     During FY-76,  the Agency's  thrust was to actively focus on priority
environmental areas in terms  of  achieving its primary goals of clean  air  and
clean water.  Although there  is  a substantial effort still to be made,  significant
progress has been achieved in many areas.

     In the field of water pollution abatement, EPA's Municipal Facilities Program
(Construction Grants) has matured to be the largest public works program  of the
federal government.  The total number of awards in this 5-quartered (4  quarters
plus the transition quarter)  fiscal year was 4,649, exceeding the planned commitment
by 3%; the mix of awards was  2,715, 864, and 1,070 for Steps 1,  2, and  3, respectively
This number of awards obligated  a total of $4,809,000,000 for FY-76,  achieving 77%
of the planned commitment.  An important factor in the continuing process of awards
is the annual "mix" of project awards; for FY-76 the planned mix was  40%-32%-28%,
and the actual mix was 58%-19%-23% for Steps 1, 2, and 3 awards,  respectively.  There
remains $6.6 billion to be obligated during FY-77 (not including Talmadge-Nunn or
other new funding)  and a planned mix of 28%-40%-32% will be necessary to  offset
FY-76's large number of Step  1 awards.  During the year,  31 final and 39  draft
Environmental Impact Statements  (EIS) were filed with the Council on  Environmental
Quality (CEQ) on EPA municipal construction grants projects.

     Due to financial difficulties and uncertainties in many States,  program
delegation was not  as high as anticipated for FY-76.  Delgation of water-related
programs to the States in FY-76  is summarized below.
                                  Start 7/1/75   Commitment   Actual 9/30/76
Approved NPDES Programs
Final Plans & Specs  Review
Bid Tabulation Review
Change Orders Review'
O&M Manual Review
Interim Inspections
24
27
 2
26
33
 0
33
41
14
38
40
 7
28
37
 7
37
38
 2
                                       N - i

-------
     For the NPDES Program, FY-76 was the year the emphasis shifted from the
issuance of permits to the enforcement on the permits already issued.  In the major
nonmunicipal permit area, 87% of the permittees were meeting the compliance
schedule requirements of their permits.  This was achieved by an enforcement activity
level of 11,310 reconnaissance inspections (EPA and States), 4,357 sampling inspec-
tions (EPA and States), and 764 enforcement actions (EPA only).  In the major
municipal permit area, 82% of the permittees were meeting the compliance schedule
requirements of their permits.  This was achieved by an enforcement activity level
of 15,971 reconnaissance inspections (EPA and States), 3,923 sampling inspections
(EPA and States), 4,566 operation and maintenance inspections (EPA and States) and
604 enforcement actions (EPA only).

     In its efforts to abate water pollution, EPA monitors federal facilities, as
well as municipal and nonmunicipal dischargers.  In FY-76, 86 major federal facility
NPDES permits were issued by EPA; this brings the total to 232 major federal
facilities covered by NPDES permits.  At the end of the fiscal year, 82% of these
permits were in compliance with their permit schedules and conditions;  this
compares favorably with the compliance levels both in municipal government and
industry.

     In the Water Supply Program, 53 grants were awarded to the States for a total
of $7.5 million; Pennsylvania, Indiana, and American Samoa refused to accept grants.
During FY-76,  54 States expressed intention to assume primacy enforcement responsi-
bility in the Water Supply Program (Pennsylvania and Indiana did not); however,  due
to late issuance of regulations,  no States had assumed primacy as of September 30,
1976.  Also,  the Underground Injection Control (UIC) Program has been slowed down
by late issuance of guidance and regulations.  The Section 208—Areawide Water
Quality Management Planning Program was quite active in FY-76,  and as of
September 30,  a total of 176 areawide agencies had been designated, approved,  and
funded for a total of $167,100,000.  Of these, 144 agencies have had work plans
completed and approved.

     In other water-related activities, the Agency evaluated 84 State water
pollution abatement laboratories, exceeding its FY-76 commitment by 10 evaluations.
Also, 13,289 Spill Prevention Containment and Control (SPCC) inspections were
conducted,  exceeding the annual commitment by 12%.


                                       N - ii

-------
     One of the Agency's highest priorities in FY-76 was the attainment and
maintenance of national ambient air quality standards.  As an indicator of efforts
toward achieving these standards, the Agency monitored MBO outputs associated with
ensuring compliance of stationary sources with State Implementation Plan (SIP)
emission requirements.  Of the 21,675 known point sources, approximately 92% were
in compliance, 6% were out of compliance with final SIP requirements, 1% were out
of compliance with schedules, and an additional 1% were of unknown compliance
status as of September 30, 1976.  The high percentage achievement was accomplished
by an enforcement level of activity of 1,091 enforcement actions by EPA; this was
100% achievement of the planned commitment.  Also, the Regions appear to be placing
proper emphasis on enforcement in Air Quality Control Regions (AQCR)  exceeding
the air quality standards.  Of the total number of enforcement actions taken in
FY-76, approximately 60% were enacted in AQCRs exceeding the air quality standards.

     During the fiscal year, federal facilities also made progress in complying
with SIP requirements.  Of the 399 known federal point sources,  75% were either in
compliance or on a consent declaration, an additional 15% were of unknown status, "
and only 10% of the sources were out of compliance with SIP requirements.  The
Regional Offices and the Office of Federal Activities are working to bring this
final 10% into compliance.

     In the area of State program delegations, although the MBO output commitments
were missed, the Agency had some success in FY-76 in the delegation of the NSPS and
NESHAPS Programs.  The start level at the beginning of the year was 2 delegations
for each of these programs, and by September 30, 1976, 23 States had accepted NSPS
delegation and 17 States had accepted delegation of the NESHAP Program.

     The program to assure compliance with fuel additive regulations requires the
testing of gasoline samples to determine the lead content (re:  catalytic mufflers).
In FY-76,  the Regions committed to testing 30,250 samples, and as of September 30,
1976, they had actually tested 34,950 samples, exceeding their commitment by 16%.
This testing effort resulted in issuance of 193 Notices of Contamination, which
represents a 0.6% contamination level.   In addition to the contamination notices,
7,701 general availability, nozzle,  and other violations of the fuel additive
regulations were noted.
                                     N - iii

-------
     In the Pesticides Program, 30 States had Section 4 Plans to establish
operational State Certification Programs approved during the fiscal year.  At
present, 43 States are operating State Certification Programs, but due to legal
and procedural difficulties and definitions, not all of these are fully approved
by EPA.  In other efforts to ensure the proper use and application of pesticides,
the-Regions conducted 1,399 use and reentry investigations; this exceeded their
MBO commitment level by 21%.

     In their efforts to continue effective focus on industry compliance with
pesticide registration requirements, the Regional Offices conducted 2,685 producer
establishment inspections, 572 import investigations, and 3,675 marketplace
investigations; this exceeded their MBO output commitments by 17%, 5%, and 31%,
respectively.  All of this inspection activity resulted in a total of 420 civil   •
actions, 318 stop sale, use, or removal and seizure orders; 166 import detentions;
254 recalls issued, and 1,217 warnings inititated under Section 9 of FIFRA.

     In FY-76, the Solid Waste, Radiation,  and Noise Programs were also quite active,
The Regions achieved 96% of their commitments to develop State strategies for
control of disposal sites and 98% of their commitments to develop State strategies
for disposal of hazardous wastes.  Shortly after the close of the fiscal year,
Congress passed the Resource Conservation and Recovery Act of 1976, setting new
goals for the Solid Waste Program in FY-77.  In the radiation area, the Regions
committed to support the States in developing Emergency Response Plans and
anticipated 34 plan approvals; by the end of the year, 21 plans were approved,
achieving 62% of the commitment.   The major emphasis in the Noise Program in FY-76
was in developing new regulations to control noise from specific sources and in
working with the Federal Aviation Administration (FAA) on the EIS on SSTs.
                                     N - iv

-------
                   5000
                                              NRTIONRL    MRNRGEMENT SUMNRRY REPORT
                                                               FY  1976
                                       1  WRTER - MUNICIPRL  FRCILITIES  PROGRRM  MRNRGEMENT
                                              NUMBER OF CONSTRUCTION GRRNT  RWRRDS
                 STflRT LEVEL
X flCTURL UNITS
0   152   383   635  905,1178  1616 1872  2346  2669 3004  3322 3977
4649
                RFMBRKSs
                 The total number of awards through the TQ exceeded the original FY-76 plans by 3%, due solely to the
                 large number of Step 1 awards made (FY-76 plans exceeded by 50%).  The FY-76. plans for Step 2 and 3
                 awards were missed by 40$ and 15%, respectively.  An important factor in the continuing process of
                 awards is the annual "mix." For FY-76, the planned mix was 40%-32!-28! for Steps 1, 2, and 3, but the
                 actual awards missed the plans considerably, with a mix of 58%-19%-23$.  The failure to make the
                 planned mix will likely cause future delays in the program unless the FY-77 planned mix of 28l-40%-32%
                 is realized.
                                                             N -  1

-------
                 7500
                 6000-
               o
               21
               d
                 4500-
               o
               a
                 3000-
               cr
               i—
               o
                 1500-
                                         NRTIONRL   MRNRGEMENT SUMMflRY REPORT
                                                        FY 1976
                                   1  WRTER - MUNICIPRL FRCIL.ITItS PROGRRM MRNRGEMENT
                                  DOLLRR  VRLUE  OF  CONSTRUCTION  GRRNT  flNflRDS  (MILLIONS)
               STRRT LEVEL

O PLRNNED UNITS     0

X flCTURL UNITS      0  219

7. PICTURE/COMMIT     0    4
    1088           1653 '          2261           4643

514  738  893 1157 1652 1790 1999 2259 2413 2789 4141

  9   13   16   20   29   31   35   39   42   49   72
5739

4809

  84
              RFMflRKS;
               All FY-75 funds and 21% of the remaining P.L. 92-500 funds  (FY-76) were obligated.
               Only Region IV exceeded its commitment through the TQ.  Major  slippages occurred  in
               Regions III, V, VIII, and X.  This slippage leaves $6.6 billion  to obligate  during the
               coming fiscal year, an amount 14% in excess of the amount obligated during the  last
               5 quarters.  (This does not include the Talmadge-Nunn Amendment  or any new FY-77
               Funding.)

-------
                       Water 2 - State Program Delegations

                                    National
Approved NPDES Programs
Final Plans § Specs Review
Bid Tabulation Review
Change Orders Review
0§M Manual Review
Interim Inspections
Start 7/1/75

     24
     27
      2
     26
     33
      0
Commitment

    33
    41
    14
    38
    40
     7
Actual 9/30/76

      28
      37
       7
      37
      38
       2
NOTES:    The States which were programmed to assume but did not are:

     - NPDES -- Maine, Pennsylvania, Illinois, Arkansas, Arizona

     - Plans 5 Specs Review -- Pennsylvania, Kentucky, Minnesota, Arizona

     - Bid Tab -- New York, Georgia, North Carolina, South Carolina, Illinois, Indiana
          Michigan, Ohio (Nevada was not programmed but did assume.)

     - Change Orders -- Maine, Pennsylvania, Kentucky, Michigan, Arizona (Illinois,
          Ohio, Nebraska, and Hawaii were not programmed but did assume.)

     - 0§M Manual -- Pennsylvania, Kentucky, Arizona (Hawaii was not programmed but
          did assume.)                       ~~"  "' —

     - Interim Inspections -- Maine, Vermont, New York, North Carolina, Washington
                                        N - 3

-------
                  100
                                                                      REPORT
                                                        F  1976
                              3R WflTER NPDES PERMIT ISSUF1NCE flND COMPLIflNCE--NON-MUN1CIPflL
                               7.  OF  MflJOR NON-MUNI  PERMITTEES IN COMPLIflNCE WITH SCHEDULES
               STflRT LEVEL

O PLflNNED UNITS     0

X flCTUflL UNITS      0
77

77
79

82
82

86
84

87
85

87
              RFMflRKR;
                This graph depicts the percentage of major nonmunicipal permittees reported to be
                meeting the compliance schedule requirements of their permits.  Overall compliance
                at the end of the year was 87%, slightly above planned levels.  The Regions ranged
                from 71% (Region VI) to 100% (Region VIII).  Along with all of the States in
                Regions VIII and VI, the District of Columbia, Virginia,; Arizona, and Idaho reported
                100% compliance.
                                                       N -  4

-------
                25000
                                         NflTIONflL   MflNflGEMENT SUMMflRY REPORT
                                                        FY 1976
                               3R  WflTER   NPDES  PERMIT  ISSURNCE  RND  COMPLIflNCE-NONMUNICIPflL
                              RECON INSPECS OF MflJOR (NON-MUNI) PERMITTEES BY EPfi t STflTES
                                                                                                     c±>
                                                                                              —OlOOoi =
                                                                                                  50

                                                                                                  25

                                                                                                   0
               STPRT LEVEL
O PLRNNED UNITS     0
X flCTURL UNITS      0
X. RCTUflL/COMMIT     0
3145
1788
  13
6174
3607
  25
9304
7082
  50
12391
 9137
   65
14158
11301
   80
              RFMflRKS;
                This graph depicts  the number of reconnaissance  inspections of major  nonmunicipal
                permittees performed by EPA Regional  staff and by  the State offices.   Of  the  total
                inspections, EPA staff."conducted;:!,231V:which 'is 88% of the 'Commitment, level  of  1,392
                Five Regions missed their commitments.  The States conducted  10,070 inspections,
                79% of planned  levels.  Twenty-six  States did not  meet their  commitments.   The total
                of 11,301 inspections is about  2.4  times the number of major  nonmunicipal  permittees.
                                                     N -  5

-------
                 5000
                                         NRTIONflL   MRNRGEMENT SUMMflRY REPORT
                                                        FY 1976
                               3fl  WflTER   NPDES  PERMIT  ISSURNCE  RND  COMPLIflNCE-NONMUNICIPflL
                              SflMPLING INSPECS OF MRJ(NON-MUNI) PERMITTEES BY EPfl *, STflTES
                                                                                                O100
               STRRT LEVEL
O PLflNNED UNITS     0
X RCTURL UNITS      0
'/. RCTUflL/COMMIT     0
914
629
 13
1850
1404
  30
2727
2450
  52
3626
3263
  69
4716
4357
  92
              RFMflRKS !
                 This  graph depicts  the number of sampling inspections of major nonmunicipal permittees
                 performed by EPA Regional  staff and by State offices.  EPA staff conducted 814
                 inspections, 11 more than  the total commitment.   Five Regions met or exceeded their
                 commitment,  and another 3  nearly achieved planned levels.  The States conducted
                 3,543 inspections,  91% of  their total commitment of 3,913.  Twenty-three States
                 missed their commitments.
                                                       N  -  6

-------
                 2500
                                          NflTIONflL MflNflGEMENT  SUMMflRY  REPORT
                                                        FY 1976
                              3fl WflTER NPDES PERMIT ISSUflNCE flND COMPLIflNCE—NON-MUN1CIPflL
                                     NO. OF EPfl NON-MUNICIPflL  ENFORCEMENT flCTIONS
               STflRT LEVEL
tD PLflNNED UNITS     0
X flCTUflL UNITS      0
K RCTUflL/COMMIT     0
291
121
 44
565
274
 21
867
450
 35
1166
 623
  48
1296
 764
  59
              RFMflRKSs
                This graph combines 3 different types of NPDES enforcement actions ^related to
                major and minor nonmunicipal permittees for which the Regions made separate commit-
                ments.  The Regions committed to 276 Notices of Violation and issued 81, 261 of
                this level to delegated States.  A total of 563 Administrative Orders were issued,
                65% of the commitment to 862 issuances.  There were 120 cases referred to the Justice
                Department, 761 of the commitment to 158 Referrals.
                                                    N - 7

-------
                  100
                                          NflTIONflL MflNflGEMENT GUHMRRY  REPORT
                                                        FY 1976
                                WflTER 3B NPDES PERMIT ISSURNCE flND COMPLIflNCE--MUNICIPflL
                              V, OF MflJOR MUNICIPAL PERMITTEES IN COMPLIflNCE WITH SCHEDULES
               STflRT LEVEL
O PLflNNED UNITS     0

X flCTUflL UNITS      0
59

71
65

64
69

79
73

84
              RFMflRKS;
               This graph depicts the percentage of major municipal permittees reported to be meeting
               the compliance schedule requirements of their permits.  Overall compliance at the end
               of FY-76 was 821, slightly above planned levels.  The Regions ranged from 53% (Region
               VI) to 96% (Region IV).  Alabama, Georgia, the District of Columbia, the Virgin Islands,
               American Samoa, and the Trust Territories reported 1001 compliance.  Five States
               (Rhode Island, West Virginia, Michigan, Arizona, and New Mexico) reported 50% or less
               in compliance.
                                                     N  -  8

-------
                25000
                                         NflTIONflL   MflNflGEMENT  SUMMflRY  REPORT
                                                        FY  1976
                                3B WflTER   NPDES  PERMIT  ISSUflNCE flND  COMPLIRNCE-MUNIC IPflL
                                RECON INSPECS OF MflJORlMUNI) PERMITTEES BY EPfl 4 STflTES
               STflRT LEVEL
O PLRNNED UNITS     0
X flCTURL UNITS      0
'/. flCTUflL/COMMIT     0
1902
2274
  18
3690
6056
  47
5463
8998
  71
 7290
12529
   98
12752
15871
  124
              RFMPRKS:
               This graph depicts the number of reconnaissance  inspections of major municipal
               permittees conducted by EPA Regional  staff and by the State offices.  EPA staff per-
               formed  752 inspections, exceeding  its total commitment of 674.  Only 3 Regions did
               not meet their commitments.  The States conducted 15,119 inspections, exceeding their
               total commitment of 12,078 by a fourth.  Twenty  States did not meet their commitments.
               The total of 15,871 inspections is about 3.4 times the number of major municipal
               permittees.
                                                     N - 9

-------
                 5000
                                         NRTIONRL   MRNRGEMENT SUMMRRY REPORT
                                                        FY 1976
                                3B WRTER  NPDES PERMIT ISSURNCE RND  COMPLIflNCE-MUNICIPRL
                               SRMPLINC INSPECS OF MflJOR(MUNI) PERMITTEES  BY  EPR  4  STRTES

               Q_
               CO
                 4000-
               ~ 3000-
               o
                 2000
                 1000-
                                                                                                 100
                                                                                                  50
                                                                 25
               STflRT LEVEL
O PLflNNED UNITS     0
X RCTURL UNITS      0
'/. RCTURL/COMMIT     0
822
594
 15
1575
1884
  49
2188
2106
  55
3051
2768
  72
3853
3923
 102
              RFMflRKR;
               This graph depicts the number of sampling  inspections of major municipal permittees
               conducted by EPA Regional staff and by  the  State offices.   EPA staff performed  491
               inspections, exceeding its commitment of 457.  Only  3 Regions missed their commitments,
               and 2 of these missed by only 1 inspection.  The States conducted  3,432 inspections,
               slightly more than their total commitment  of 3,396.  Seventeen States did not meet
               their commitments.
                                                       N - 10

-------
                 5000
                 4000-
               Q_
               (O
                 3000-
               o
               £ 2000
                 1000-
3B WflTER
  NO-
                                         NRTIONRL   MRNRGEMENT SUMMRRY REPORT
                                                        FY 1976
                                          NPDES PERMIT ISSUANCE RND COMPLIRNCE-MUNIC IPRL
                                          INSPECS  OF  MRJOR  MUNI  PERMI TTEES-EPR  4  STRTE
                                                                                                O100

               STRRT LEVEL
(D PLflNNED UNITS     0
X RCTURL UNITS      0
7. RCTURL/COMMIT     0
 1007
 729
   17
1923
1406
  33
2791
2277
  53
3751
3601
  85
4260
4566
 107
              RFMRRKS;
                 As of Sept. 30, 1976, the number of O^M inspections totaled 4,566, exceeding the
                 annual commitment of 4,260 by 306.  Region IV accounted for nearly one third of the
                 total with an output of 1,474.  Other Regions with large outputs were VI (796),
                 III (589), and VII (514).  Region IX did not make a commitment for this output and
                 chose to report them as compliance inspections in FY-76.
                                                     N - 11

-------
                  750
                                          NflTIONflL MRNRGEMENT SUMMRRY REPORT
                                                        FY 1976
                                3B WPTER NPDES PERMIT ISSUANCE flND COMPLIRNCE--MUNICIPRL
                                       NO.  OF EPfl HUNICIPflL  ENFORCEMENT flCTIONS
                                                                                                4)100
                                                                                                  75o
                                                                                                     a:
                                                                                                    °S
                                                                                                  25
               STRRT LEVEL
O PLRNNED UNITS     0
X flCTUflL UNITS      0
'/. RCTURL/COMMIT     0
144
129
 18
290
222
 30
439
348
 48
617
510
 70
732
604
 83
              RFMRRKS;
                This  graph  combines  3  different  types  of NPDES enforcement actions related to major
                and minor municipal  permittees  for  which the  Regions  made separate commitments.   The
                Regions  issued  90  Notices  of  Violation to delegated States,  55$  of the total commitment
                of 164.  A  total of  486 Administrative Orders were  issued, 93%  of the commitment to
                525.   There were 28  cases  referred  to  the Justice Department,  651 of the commitment to
                43 Referrals.
                                                       N  - 12

-------
                  750
                                         NflTIONfiL   MRNflGEMENT SUMMflRY REPORT
                                                        FY 1976
                           3C WflTER  NPDES PERMIT ISSUflNCE flND COMPLIflNCE - FEDERflL FflCILITIES
                                   NO. FED FflC OPERS EXRMINED  FOR COMPL W/PERMIT PROV
               STflRT LEVEL
O PLflNNED UNITS     0
X flCTUflL UNITS      0
% flCTUflL/COMMIT     0
 91
107
 23
174
206
 44
249
282
 60
349
386
 82
469
510
109
              RFMBRKS;
                 Six Regions either met or exceeded their commitment for federal facility operations
                 examined for compliance.   During FY-76,  86  major federal facility NPDES permits
                 were issued, increasing the end of year  total  to 232.   At the end of FY-76,  88% of
                 these permits were found to be in compliance with their permit schedules.
                                                     N - 13

-------
                  250
                  200
                CO
                CO
                I—I
                LU
                  150
                UJ
                  100
                    0
                       4fl WflTER
              NflTIONflL   MRNflGEMENT SUMMflRY  REPORT
                            FY  1976
     PREP OF  EISS 4 NEC DECLflRflTIONS FOR EPfl'S HUT PIT CONSTRUCTION  CRTS
       NO. FINRL EISS FILED W/CEQ ON CONSTRUCTION GRflNTS
                                                      ©—
                                                                  e—
                       JUL
BUG
SEP
OCT
NOV
DEC
JflN
FEB
MflR
flPR
MflY
JUN
JUL
RUG
SEP
                                                                         o
                                                                                                     a:
                                                                                                     a.
                                                                $100
                                                                  75
                                                                  50
                                                                  25
                                                                   0
                                                                 i
                                                                 *~*
                                                                 i
               STflRT LEVEL
O PLflNNED UNITS    55
X flCTUflL UNITS     55
7. RCTUPL/COMMIT    53
       62
       62
       60
                 71
                 63
                 61
                           89
                           66
                           64
                                    103
                                     73
                                     71
                                              103
                                               86
                                               83
              RFMflRKS;
                 Regions VI and X met, Regions IV and X nearly met, and the other Regions did not
                 achieve their commitment for final EISs filed with CEQ on construction grant actions
                 During FY-76, 31 final and 39 draft EISs were filed with CEQ,  increasing the end
                 of year totals to 86 and 99, .respectively. ..

-------
                             Water 5 - Water Supply


                                    National



1.   Number of Water Supply Program grants awarded.                        53


2.   Amount of FY-76 program grants awarded.                               $7.5 million


3.   Number of Water Supply Program grants refused (Pennsylvania,
     Indiana, and American Samoa).                                          3


4.   Amount of FY-76 program grants reallocated.                           $482,300


5.   Number of States and territories expressed intention to assume
     primary enforcement responsibilities.                                 54


6.   Number of States and. territories expressed intention not to assume
     primary enforcement responsibilities (Pennsylvania and Indiana).       2


7.   Number of States and territories assumed primary enforcement
     responsibilities as of September 30, 1976.                             0
                                       N - 15

-------
                      Water 6 - Section 208--Water Quality Management Planning


                                              National


                         Region;    I     II     III     IV    V     VI    VII    VIII    IX    X     Total


1.  Number of areawide
    designations approved
    and funded                     18     14      12     32    32     13     5     22      17    11     176


2.  Amount of funds
    obligated ($M)               $ 13.24  24.25   17.86  23.00 39.59   9.65  5.79  12.55   14.61  6.56  167.10


3.  Number of areawide
    work plans completed
    and approved                   15     11      12     26    25       95     21      10    10     144
                                                 N  -  16

-------
                  25000
                                           NflTIONflL    HflNflQEMENT  SUMMflRY  REPORT
                                                          FY  1976
                                         7  WflTER  SPILL PREVENTION flND CONTROL
                                        NO- SPCC PLflN COMPL/IMPL  INSPECS
  \Lf

*
               STflRT LEVEL
  PLflNNED  UNITS   5922
  flCTUflL  UNITS   5922
'/. flCTUflL/COMMIT     50
8301
9759
  83
 9762
12283
  104
1181.8
13289
  112
                RFMQRKSi
                  As of Sept.  30,  1976,  the number  of  SPCC  inspections  totaled  13,289.   It  exceeded
                  the annual commitment  of 11,818 by 1,471.   Since  5,922  inspections were completed
                  prior to FY-76,  the  actual number completed during  the  fiscal  year,  including  the
                  transitional quarter,  was 7,367.  Region  IV, by far,  completed the most with an
                  output of 7,774, which accounted  for more  than one  half of  the total  Agency output.
                  Other Regions with large outputs  were VI  (987), IX  (927), and  V (922).  All Regions
                  exceeded their commitments for this  output.
                                                         N  -  17

-------
                  100
                                         NflTIONflL    MflNflGEMENT  SUMMRRY  REPORT
                                                        FY  1976
                                    WflTER   STflTE MONITORING PROGRflMS: QURLITY flSSURflNCE
                                         NO.  OF  STflTE  LflBORflTORIES  EVflLUflTEO
                                                                                                )100
                                                                                                  50  <->
               STflRT LEVEL

CD PLflNNED UNITS     0

X flCTUflL UNITS      0

7. flCTUflL/COMMIT     0
20
11
15
6Z

12

97
 74

 84

114
              RFMQRKS;
                 The Agency completed 84 State water pollution laboratories as of Sept. 30, 1976,
                 exceeding the annual commitment of 74 by 10«   All Regions either achieved or
                 surpassed their respective commitments.   Region IV overachieved its commitment of
                 18 with an output of 25,  and II exceeded its  commitment of 8 evaluations by 4.
                 Regional personnel reported that,  in general, most State laboratories were adequately
                 equipped and staffed,  and met the  minimun standards established under Appendix A
                 of the Section 106 regulations.
                                                     "N - 18

-------
                50000
              CO
                40000-
              co
              LU
                30000H
              o
              C£
                20000-
                 10000-
                                         NRTI'ONRL   MRNRGEMENT SUMMRRY REPORT
                                                        FY 1976
                               2C  flIR    -  flSSURE  COMPLIANCE  WITH  FUEL  flDDITIVE  REC-ULRTIONS
                                       NO  GflS  SRMPLES  TESTED BY FIELD/LflB METHOD
               STRRT LEVEL
O PLflNNED UNITS     0
X RCTUflL UNITS      0
7. RCTUflL/COMMIT     0
5850
7492
  25
11617
12802
   42
18017
18723
   62
25000
27900
   92
30250
34950
  116
              RFMHRKfi;
                 All Regions nearly met or exceeded their FY-76 commitment for gas samples  tested
                 to ensure compliance with fuel additive regulations.  This testing effort  resulted
                 in the issuance of 193 Notices of Contamination, which represents ..a  0.6%  contamir
                 nation level.  Only Regions II and VIII reported higher contamination levels of  ;
                 1.81 and 1.5%, respectively.  In addition to the contamination violations, the
                 Regions reported 7,701 general availability, nozzle, and other violations  of the
                 fuel additive regulations.
                                                        N  -  19

-------
               25000
             1020000
             U.i
             £l5000
             u_
             o
             §10000
                5000
                  0
                                       NflTIONRL   -MPIN.qGF.MENT  SUMMRRY KEPORT
                                                    .   FY  1976
                      3fl RIR    -  ENSURE  CONTINUED COfPLIRNCE  WITH SIP REQUIREMENTS IN ERCH STRTE
                                   NO 1DRNT. PT SOURCES IN COMP W/FINAL EMISS REQ
                                                                                              —<>ioQ,
                     JUL
RUG
SEP
OCT
NOV
DEC
JHN
FE'B
MflR
RPR
MRY
JUN
JUL
RUG
SEP
                                                                       755
                                                                         Q_
                                                                         LL
                                                                       so"
                                                                                                 25
                                                                      T.
                                                                      \—
                                                                      U-4
                                                                      IT
            . STRRT LEVEL'
PLRNNED UNITS  13920
RCTURL UNITS   13920
ACTUAL/COMMIT     70.
     14531
     14839
        75
               15418
               16984
                  85
                         15959
                         18060
                            91
                                   16976
                                   17924
                                      90
                                             19881
                                             18367
                                                92
             Regions III, V, VII, IX, and X nearly met their FY-76 commitments  for  having  sources
             come 'into compliance.  Region VI was the only Region to exceed  its  FY-76  commitment.
             Regions I, II, IV, and VIII accomplished 75%, 88%, 88%, and  82%  of  their  commitments,
             respectively.  Of the 21,675 known point sources, approximately .92% are in  compliance,
             7% are out of compliance, and the compliance status of the remaining sources  was
             unknown as of September 30, 1976.
                                                       N  -  20

-------
                 2500
                        3fl flIR
                               NO
         NflTIONflL   MflNflGEMENT SUMMflRY REPORT
                       FY  1976
 -  ENSURE CONTINUED COMPLIRNCE WITH  SIP  REQUIREMENTS  IN  EflCH  STFITE
 IDENT PT SRC OUT OF COM N/FNL EMISS REG) NOT ON SCO
                                 SEP
     OCT
NOV
DEC
JflN
FEB
MRR
RPR
MRY
JUN
JUL
RUG
SEP
               STflRT LEVEL

O PLflNNED UNITS  1396

X flCTUflL UNITS   1396
1109

1605
      81.1

     1606
                559

               1330
                          284

                         1406
                                    284

                                   1226
              RFMflRKS;
                  None of the Regions accomplished their FY-76 commitments for reducing the number of
                  sources out of compliance.   Of the 21,675 known sources, 6% were out of compliance
                  with final SIP regulations  and an additional \\ was out of compliance with schedules
                  at the end of FY-76.   Regions VII, IX, and X had the lowest out of compliance level,
                  each Region having approximately 21 of its known sources out of compliance.
                                                      N  -  21

-------
                        3fl flIR
                 2500
        NRTIONflL   MflNflGEflENT SUMMflRY REPORT
                       FY 1976
- ENSURE CONTINUED COMPLIflNCE WITH SIP REQUIREMENTS IN EflCH STflTE
      flNTICIPflTED NO ENF flCTS BY EPfl BY STflTE
               CO
                 2000-
               o
               cr
                ,' 1500-
               UJ
               U_
               O
               O
                 1000-
                  500 -
               STflRT LEVEL
O PLflNNED UNITS     0
X RCTUflL UNITS      0
7. flCTUflL/COMMIT     0
192
226
 21
435
395
 36
642
532
 49
843
790
 72
1094
1091
 100
              RFMflRKS
                 Regions I,  II,  V,  VII, IX, and X exceeded their commitments  to undertake  enforcement
                 actions to  improve  source compliance.  Regions III, IV, VI, and VIII accomplished
                 761,  801,  49%,  and 89% of their FY-76 enforcement action commitments.   The Regions
                 appear to  be placing proper emphasis on enforcement in Air Quality Control Regions
                 (AQCR) exceeding air quality standards.  Of the total number of enforcement actions,
                 approximately 601  have been taken in these nonattainment AQCRs.
                                                       N -22

-------
                 Air 3B a Air 6 - Delegation of NSPS and NESHAPS

                                    National

Number of States

          Delegated     Start Level     Commitment     Actual 9/50/76

            NSPS             2              41               23
           NESHAPS           2              33               17
REMARKS:

Regions I and X met their FY-76 commitment for States granted delegation of NSPS
enforcement authority.  Region III and X met their commitment for States granted
delegation of NESHAPS enforcement authority.  All Regions except Regions VI and IX
had at least 2 States adopt one or both of these programs.   Although Region IX
did not make any Statewide delegation, the Region did grant delegation to 15 major
local agencies.
                                      N  -  23

-------
                  500
                         7  flIR
       NRTIONRL   MRNRGEMENT SUMMRRY REPORT
                      FY  1976
  ENSURE COMPLIRNCE OF FEDERRL FRCILITIES NITH SIP REQUIREMENTS
    NO- FED PT. SOURCES  IN COMPLIflNCE WITH SIPS
               STflRT LEVEL
O PLRNNED UNITS   118
X RCTURL UNITS    118
'/ RCTUflL/COMMIT    36
151
139
 43
171
161
 49
221
145
 44
269
249
 76
326
246
 75
              RFMQRKS;
                Regions  II, VI, and VII exceeded, and  the other  7  Regions  did  not  achieve  their
                commitment for number of  federal point  sources in  compliance with  SIPs.  At  the
                end ofFY-76, 751 of the  399  federal point  sources were .either in  compliance,  or
                on a consent declaration;  an  additional  15% of the point sources are  of  unknown
                status.
                                                      N - 24

-------
                  250
                         7  flIR
        NRTIONRL    MRNflCEMENT SUMMflRY REPORT
                       FY  1976
   ENSURE  COMPLIflNCE  OF  FEDERflL FflCILlTIES WITH SIP REQUIREMENTS
   NO- FED PT. SOURCES OUT OF COMPLIflNCE WITH SIPS
                                   -X-
                                    ©—
                                                                                ©—-
                                SEP
    OCT
NOV
DEC
JflN
FEB
MflR
flPR
MflY
JUN
JUL
flUG
SEP
               STflRT LEVEL
CD PLflNNED UNITS   101
X flCTUflL UNITS    101
112
125
      118
      123
                120
                 74
                          121
                           90
                                    111
                                     82
              RFHflRKfii
                 Three  Regions  exceeded and 7  others  either  met  or  were  lower  than  their  commitment
                 for  number  of  federal  point sources  out  of  compliance with  SIPs.   At  the end of
                 FY-76,  21%  of  the  399  federal point  sources were out of compliance.   However,  half
                 of the  out  of  compliance  federal  point  sources  are on a consent  declaration.
                                                   N -  25

-------
                                         NflTIONRL   HflNflGEMENT SUMMPRY REPORT
                                                        FY 1976
                            1 PESTICIDES - ESTflBLISH OPERflTIONflL STflTE CERTIFICATION PROGRRMS
                                        NO. STflTE SECT. 4 CERT PLflNS flPPROVED
                                                                                                   0
               STflRT LEVEL
O PLflNNED UNITS     3
X HCTUflL UNITS      3
7. flCTURL/COMMIT     6
12
 4
 8
30
10
19
43
15
29
52
25
48
52
30
58
              RFMBRKS;
                At the close of FY-76, 30 States had approved plans.  During the month of October,
                New York and South Dakota were approved for a total of 32 States with approved plans
                                                      N -  26

-------
                   2500
                              2fl
                                         NflTIONRL   MflNflGEMENT SUMMflRY REPORT
                                                        FY 1976
                                PESTICIDES - ENSURE PROPER USE flND flPPLICflTION OF PESTICIDES
                                     NO.  USE FIND  RE-ENTRY  INVESTIGflTIONS  CONDUCTED
i
               STflRT LEVEL
O PLflNNED UNITS     0
  RCTUflL UNITS    '  0
  flCTUflL/COMMIT     0
195
325
 28
344
472
 41
499
692
 60
 791
1162
 100
1159
1399
 121
                RFMHRKS?
                  Region  II  and  Region  IV  did  an  outstanding  job  in  this  program.   A total  of 121%  of
                  the  commitment was  obtained,  and  only  1  Region,  Region  VI,  did not meet its commitment
                                                          N  - 27

-------
                 5000
                                         NRTIONRL   MRNflGEMENT SUMMRRY REPORT
                                                        FY 1976
                         2C  PESTICIDES  -  CONT  EFFECTIVE  REC-IONRL  FOCUS  ON  INDUSTRY  COMPL  W/REG  REQ
                                       NO.  OF  PRODUCER ESTRBLISHMENTS INSPECTED
               STRRT LEVEL
O PLflNNED UNITS     0
X RCTURL UNITS      0
7. RCTURL/COMMIT     0
372
535
 23
 831
1145
  50
1278
1802
  79
1718
2264
  99
2290
2685
 117
              RFMflRKS;
                   The Agency exceeded its commitment for producer establishments  inspected by  17%.
                   The 2,685 inspections conducted resulted in a total of 255 civil actions and  136
                   stop sale, use orrremoval orders, and seizures.
                                                        N - 28

-------
                                         NflTIONRL   MflNflGEMENT SUMMflRY REPORT
                                                        FY.1976
                        1 SOLID WflSTE - DEV 4 IMPLEM COMPL.EM ST 4 FED STRflT TO UPGRflDE ST SW PROGS
                                  NO- STflTE STRflTEGIES FOR CONTROL OF DISPOSflL SITES
                                                                                                  100
                                                                                                  75

                                                                                                  50
                                                                                                  25
               STRRT LEVEL
0 PLRNNED UNITS     0
X flCTUflL UNITS      0
'/. flCTUflL/COMMIT     0
 5
 5
II
14
11
24
41
26
58
45
37
82
45
43
96
              RFMBRKS;
               Only 2 Regions, Region  I and Region  III, did not  reach  their  commitments.   Region  VII
               exceeded its commitment by  33%  to  lead all Regions  in achievement  level.   The  total
               achievement level of all Regions is  96%.
                                                     N  -  29

-------
                                         NflTIONflL   MflNflCEMENT SUMMflRY REPORT
                                                        FY 1976
                          1 RflDIflTION - SUPPORT THE DEVELOPMENT OF STflTE EMERGENCY RESPONSE PLflNS
                                      NO. OF EMERGENCY RESPONSE PLflNS COMPLETED
               STflRT LEVEL
O PLflNNED UNITS    11
X OCTUflL UNITS     11
'/. RCTUflL/COMMIT    32
21
13
38
35
16
47
34
21
62
              RFMQRKS;
               Regions  I,  II, VI,  IX,  and X met  their commitments.  Region  I did  an  outstanding  iob,
               with an  achievement  level of 150%.  Regions  II, VI,  IX,  and  X had  an  achievement  level
               of  1001.  Only Regions  IV, V,  and VIII did not have  any  acceptable plans  completed.
                                                      N  -  30

-------
REGION I

-------
        END-OF-YEAR REPORT--REGIONAL OVERVIEW

                                     REGION I

     Duririg FY-76,  92  output commitments were monitored through the Formal  Reporting
System.  Region I  and  the  States in the Region met or exceeded 37 commitments, nearly
met 9 more, and did not meet 44.  In addition, no commitments were made  for 2 outputs.

     The Region obligated  over $281 million of its municipal construction funds
against a commitment of $333 million; the percentage achieved matches  the national
average of 84%. For FY-77,  the Region now has an unobligated balance  of $536 million
in P.L. 92-500 funds.  The total awards '(242) fell short of initial plans due to
slippages of Step  2 awards;  the planned mix of awards,  31%-39%-30%,  was  not achieved
with the final mix being 46%-22%-32% for Steps 1, 2, and 3 awards,  respectively.
Region I filed 2 final EISs with CEQ that covered a total of 12 Step 2 and  Step 3
grants awarded.

     The Region increased  its total State program delegations to 9,  an increase of 1
program when Maine assumed responsibility for final plans and specifications review.
The Region had expected an increase of 5 delegations overall during FY-76.

     Region I reported that 83% of the major nonmunicipal NPDES permittees  in the
Region were in compliance  with the compliance schedule  requirements of their permits
at the end of FY-76, somewhat below the national compliance level of 87%.   The Region
and the States conducted a total of 2,021 reconnaissance and sampling  inspections,
well above the total planned levels and more than 4.5 times the number of major
nonmunicipal permittees in the Region.  These activities resulted in a total of 48
NPDES enforcement  actions  against major and minor nonmunicipal permittees,  76% of
the planned level.

     Overall compliance of major municipal permittees with the compliance schedule
requirements of their  permits was reported to be 65% in Region I.   This was well
below the national municipal compliance level of 82%.  The Region and  the States
conducted a-total  of 5,329 reconnaissance and sampling  inspections,  much, higher than
planned and more than  14 times the number of major municipal permittees  in  the Region.
                                       I  -  i

-------
This was by far the highest such ratio of inspection activities of any Region.
These activities resulted in 27 NPDES enforcement actions against major and minor
municipal permittees, 87% of the number of planned actions.

     There were no violations of compliance schedules found in the 7 major federal
facility permits issued.  Only 2 other Regions had no violations found in their
major federal permits.

     Region I completed 228 O&M inspections against its annual commitment of 250
for a 91% achievement; also, it achieved 130% of its commitment for long-range
technical assistance.  The Region awarded water supply grants to all of its 6
States, amounting to $531,200.  Massachusetts and Connecticut received the largest
amounts, $121,600 and $98,300, respectively.  Although none of the Region's States
have gained primary enforcement responsibilities, all of Region I's 6 States have
expressed intent of gaining them during FY-77 or shortly thereafter.  Region I
made 18 Section 208 areawide grants, totaling $13.24 million.  Fifteen of the 18
agencies have completed their project work plans.  The remaining 3 were awarded
grants only recently and reportedly they are well on their way to completing their
work plans.   Region I completed 615 SPCC plan and implementation inspections.
This total exceeded its annual commitment of 334.  The effort was facilitated with
the use of aerial photography via the assistance of field personnel.  This Region
has completed the evaluation of all of its States' water pollution laboratories.

     In the air media, due to a reduction of the number of point sources in Region
I, the Region did not meet its FY-76 commitment for bringing sources into final
compliance.  However, the Region had 89% of its known sources in final compliance
and in compliance with schedules at the end of FY-76 as compared to a 69% compliance
level at the end of FY-75.  The Region exceeded its commitments for field surveil-
lance and enforcement actions taken to ensure point source compliance.  Emphasis
was placed on enforcement in Air Quality Control Regions (AQCR) which were not
achieving ambient air quality standards with 73% of enforcement actions taken in
these AQCRs.  Region I nearly met its commitments and made more delegations of
NSPS and NESHAPS programs than any other Region.  Only Rhode Island was not granted
delegation of either of these programs,  and Vermont was not granted delegation of
the NSPS program.
                                       I  - ii

-------
                             !;Y I-J7'5 MIV-JfiCI-MrilT SoM!-"-V:Y
                       1  HPT!3  - i-IUNlClPfiL FfiCll 1'TlF.o \'
                            N'JMbf::: OF i
                                                          fii,jr:;-:j.):5
             4035
               0.'
                                                  	1	1	h
                                                   'V1!- I :'^,r  JJM
                                                  :	i	d:	dt_
                  JliL
                                                                    JJL
                 I.EVL'!.
fiL  UNITS    0   iEil'  3:1.3  '335
                                    J1V3 'iGi'j 5-r.'^ 2345  r?G5D 3uD '• 3.1. ^2 3077
                                                    r;;?! =:3r:  :^vr  JJN .j
                                                    ..~	:fc	J-.	J::	^1-
>: ni.ruPL  UNITS
                   13
/U   3;
.113
                                                     MO
    The total  awards  fell short of the  original plans  for FY-76 due to  slippages
    in  the number of  Step 2 awards made.   The  planned  versus  actual mix of awards
    was 31%-39%-30% planned versus 46% (111)-221(54)-32%(?7) actual for  Step 1,  2,
    and 3 awards, respectively.  The  FY-77 plans may correct  this slippage with
    a planned  award mix of 24%-32%r44%,  emphasizing Step 2 and  Step 3 awards.
                                           I  -  1

-------
     During the transition quarter, Region I reassessed its compliance criteria,
changing the status for many of these sources.  At present, 54% of its 37 .federal
point sources are of unknown status.

     In the pesticides programs, the commitments for number of producer establishments
inspected and number of use and reentry investigations conducted were surpassed in
each instance with achievement levels of over 100%.  Region I's overall pesticides
program is very active; however, its State Section 4 Certification Plans need to
be strengthened during FY-77--only 2 of 6 States have been approved.   The number of
States with Applicator Certification Programs has increased throughout FY-76 to 5,
with an achievement level of 83%.

     The commitment for the number of State strategies for control of disposal sites
was nearly met.  Only 1 State strategy is lacking for a 100% achievement level.
Also, only 1 State strategy has not been approved for hazardous waste disposal.

     Region I exceeded its FY-76 commitment to support the development of State
Emergency Response Plans with an achievement level of 150%.  This is  the highest
achievement level of all Regions.
                                       I  - iii

-------
                                    f-Y 1975 MFINRGEIIENT SUHMWY REPORT
                              1  WRTLR - MUNICIPRL FRCILITIF.G PROGRflll I1RNRGEI1ENT
                             DOlLflR VRLUE OF CONSTRUCT ION  GRF1NT RWRRDS fMIl.LIONGJ
             STflRT LEVEL
O "LflNNED UNITS    0           1038
X fiCTURL UNITS     0   213 'SH  739  093
X flCTURL/COMMIT    0    4    0   13   16
                     16S3          C2S1          4643
                1157  1652 1790 1939 22S9 2-113 2799 4141
                 20   23   31   35   39   42  49   72
                                                        5733
                                                        4903
                                                         54
               SCO
                             DOLLflR VHLUE OF CONSTRUCTION GRDNT  RWRRDG TMILLIONG)
             GTHRT LEVEL
O PLRNNED UNITS    0
X RCTURL UNITS     0'
'/. nCTUflL/COMHIT    0
    REMARKS :
]
0
21
162
44
13
57
17
103
31
127
127
33
131
33
15J
45
165
50
175
53
211
G3
253
241
72
333
231
84
     The Region obligated $281  million during  the year which leaves an  unobligated
     balance  of $536 million  for FY-77, an amount \vhich is  90% more than the  Region
     obligated during the past  5> quarters.   The  percentages  of funds obligated
     for Steps 1  and 2 were below  the national average for  this Region.
                                              I  -  2

-------
                       Water 2 - State Program Delegations

                                    National
Approved NPDES Programs
Final Plans § Specs Review
Bid Tabulation Review
Change Orders Review
0§M Manual Review
Interim Inspections
Start 7/1/75

     24
     27
      2
     26
     33
      0
Commitment

    33
    41
    14.
    38
    40
     7
Actual 9/30/76

      28
      37
       7
      37
      38
       2
Approved NPDES Programs
Final Plans § Specs Review
Bid Tabulation Review
Change Orders Review
0§M Manual Review
Interim Inspections
      Region I

Start 7/1/75

      2
      2
      0
      2
      2
      0
Commitment

     3
     3
     0
     3
     2
     2
Actual 9/30/76

       2
       3
       0
       2
       2
       0
REMARKS:

NPDES - Connecticut and Vermont have the program; Maine was planned but did not assume.
Plans § Specs - Connecticut, Maine, and Vermont now have.
Change Orders - Connecticut and Vermont have the program; Maine was planned but did not
                assume.
0§M Manual - Connecticut and Vermont have.
Interim Inspecs ,- Maine and Vermont were planned.
                                      I - 3

-------
                                    FY  JQ76 M5MflOU"EMT  5UH!'!r~.'.'.Y I'EFu'VT
                          3fi WfiTL'" Hf'DLS I'KPI'HT IGjUflNf.E RNC  CCMf'L IRNf-f:--NON-MUNlCHTiL
                          '<: 01  M^.JOn NON-MUNI  I'EI'MITTLEG IN CHI-PL 1R--ICf-' WITH GfHEDULE'o
             GTfifTT LEVEL
O "LfiNNCD UNITG    C
>C ncT'jfil. iJNITS     0
77
77
                          34
                          37
                          v. Li!' MHJOP MDH-MI.JN1  fF-PM.! TTi-ibiu IN f.OMr>L U5Mr.c  '
             .5Tfi"T LEVEL
1< "LfiNNLD UNITS    C
     RL UNITS     o
75

73
75
75
11
     This  graph indicates  the percentage of major nonmunicipal  permittees reported
     to  be meeting the compliance  schedule requirements of their permits.   Region
     I reported that  831 were in  compliance at the  end of  FY-76, slightly below
     the national level of 871.
   L.
                                            I  - 4

-------
                                       FT 1975 MfiNnQLKFMT SlJNUnfVf P. K PORT
                            3n MfiTtr;  MI'Ul.'j PERMIT IGGURNf.E RMU C OWL. IfiNCE -NONHUN1C 1 f'fiL
                            REC.ON 1MSPECS Of  MRJOR f NON-I1UN1 )  PI^MITTKKS RY  L"°n  f.  3TRTC&
              GTflRT  LEVEL
CJ pLfiNNED UNITG    C
X RCTURL  UNITS     0
'!. PCTURL/COMMIT    0
31-15
1730
 13
5J7-I
3507
930-1
703.?
12391
3137
 6'5
11301-
                                                                              GTRT!;C,
                    LEVEL
rj "LHNNL'D  UNITG
X qCTUflL UNITG
7. RCTURL/CuMMIT
S02
134
 20
3-13
353
 33
5/5
5)3
 757
 735
 73
 933
 •3V 5
 \Qf,
     This graph reflects nonmunicipal permittee reconnaissance inspections conducted by EPA
     personnel  and by State personnel.   The States in Region I committed to 838  inspections and
     exceeded this by performing 855.   The EPA staff performed 121 inspections,  the  majority of
     these during the final two quarters,  and exceeded the  commitment of 100.  Three of the 6
     States  in  Region I (Connecticut, Maine, Massachusetts)  performed slightly less  inspections
     than their commitments, but this shortfall was offset  by the overages of the other 3 States.
     In every'State there were more  inspections performed than the number of major permittees in
     the State.                                              :
                                ^~             1-5

-------
                                      FT  1070 MRNRGU1FHT SUMMIT !=(:!'CiRT
                            3^ HfiTlr'r?  NPIK'S PFP.M3T ISSUONf.'l: ^MU Cf)MpL 1 flMCF. -NONHIJN1 C TPRL
                           5Rlir'LlNO lt\"jfaF.f;G OP  C!r,,ir NOM-MUN 1)  PR m1 M Tl:t G  BY  EPR  ^  GTRTfO
                                                                                            ;jfJO
                                                                                              75 z ?;
                                                                                             50 '• z.
             GTfi'H  LEVEL
''LfiNNED UNITG    G
RCTUPL UNITG     0
RCTURL/C3MI1IT    0
    9H            1350

     13             30

50MPL1NC- IMCiPEf.G Of-  MfiJI NON-HIJH1 I  PERIIITTF/fcC  KY  L'^R  «,  STRT|i'G
                             2-15G
                              5.L
                             3626
                             3C53
                              69
                             -'. 71 5
                             4357
                              Df!
             GTRRT l.EVEl.
"LflNNED UNITG    C
RCTUflL UNITS     0
RCTURL/COMI11T    0
  REHRPKS -
126
120
 1.1
334
 40
555
 SG
                                                .175
                                                739
                                                93
345
IO-I5
12.1
    This graph reflects  nonmunicipal sampling inspections performed by Region I staff and by the
    States in  the Region.   The Region performed 17 inspections,  far less than its commitment to 40
    inspections.   The States in Region I far  exceeded  their commitment of  805 by performing 1,028
    inspections.
                                             CT     ME     MA    NH    RI   VT
                               COMMITMENT - 477   129    115   19    36"   29
                               ACTUAL     - 583   130    165   18    58   74
                                                I  -  6

-------
                                   FY 1978 liqNRGr.MF.NT GUMtinRY REPORT
                         3fl WOTER NPDLS PERMIT  IGSUIWCE DNLi COHPLIRNCE--NON-MUNlCIPnL
                               NO, OF EPO NON-MUNICIPfll. ENFORCEMENT FICTIONS
            o
            r- 2000
          g^
          O tT
          t~4
          Si"
Oiooo
              000

                01
             STRRT I.F.VEI.
O PLflNNED UNITS   0
X RCTUflL UNITS    0
7. RCTUfll/COMMIT   0
                291
                121
                 44
274
21
357
450
 35
1156
623
 43
                                                                                  75 i'-
                                                                                    0
                                                                                  50 ?,-
1296
754
 5'D
                               NO. OF  EPfl NON-MUN1C1PRL ENFORCLMENT OCTION5
             GTflRT L.EVEl
o PLRNNED UNITS   o
X RCTUHL UNITS    0
'/. RCTURL/COMMIT   0
    REMRRKS •-
                 7
                 5
                 3
20
27
43
 34
 39
 43
 43
 63
 63
 48
 76
      Region I nearly met  its commitment  of 40 Administrative Orders by  issuing
      37,  but fell below its  commitments for  Referrals to Justice  (committed
      16,  made 9)  and Notices of  Violation issued to  its  2  delegated States  (com-
      mitted 7,  issued  2).   In  addition  to the NPDES  Enforcement  Actions  shown
      above, Region  I had  218 non-NPDES  Water Enforcement Actions for  a  total of
      266,  fourth  highest  among  the Regions.
                                           I  - 7

-------
                                   FY  1976 liqnnGLMENT SUMMfl!?Y REPORT
                           NRTER 315 NPUEG PERMIT  ISSURNHE RMO  CflllPL lfi!CE--l1UNlC 1PRL
                         y. ar H^JOR MUMICIPRL t'ERiurrtfcs  IN rnn?LiRNr;E  WITH 5r.HEUui.Et;
             STflfU I.EVEI.
C1 PLRNNED UNITG   0
X DCTURL UNITG    0
71
5".
                                                      73
73
94
                           * Of MQJOP MUNI fFPHITTEhG IN rONfL1RHCE WITH SCHEDULES
             GTRPT LEVEL.
(D p!_fiNNED UNITG   C
X RCTUflL UNITS    0

    PEKRRKS >	
                             .14
                             56
             -•16
             73
             77
                          43
                          77
     This  graph  indicates the  percentage of major municipal  permittees reported  to
     be meeting  the compliance schedule  requirements  of their permits.  Region 1
     reported that 65% were in compliance at  the end  of FY-76.   This  was well
     below the national  level  of 821  and the  second  lowest reported  by any  Region.
                                             1-8

-------
                                       FY 1076  nfiNRGLHENT GUHITI'^Y  REPORT
                              3D HRTt'R  NPDh'G PERMIT  IGGUHNtE RND COMFLIRNCE-MLIN1C IPfiL
                              RECDN 1N5PECG  Of HRJORtMUNI)  PERMITTEES RY IT PR «, 5TRTEG
              GTRRT LEVEL

-------
           FY J'J76 HRNnfil.l-'ENT  r,UHM n 1Y
 36 HriTiiR  NPDEG PERI1JT  IGGURNCE  RNU
GRMPLIND INGPELG Or  MPJORf I1UN1 I  PERMITTING BY EPR
                                                                                     GTRTLG
               GTflRT LEVEL
ill f'LflNNED UNITG     D
X RCTURL UNITG      0
'/. RCTURL/COmUT     0
   322
   r^A
    15
1575
1334
 43
2133
2106
 S5
3051
2753
 72
335J
3323
 102
                                 PF.PM!TTLr:S BY EPR  (.  STOTfS
                                OWLING INGPEf.G OP
               GTRRT LEVEL
Q PLRNNED UNITG
X RCTURL UNITG
X flCTURL/COWUT
REIIfiRKS'








This graph
and by the
ions . The
c
0
0

»
'


reflects
States
States
in
130
I 57
21

the number
the Region
performed 663
334
233
3'J

of municipal
Region I
inspections
-400
3TO
52

sampling inspections
640
533
71





performed by
met exactly its commitment to 19
, 67 less than its commitment;-
exceeded its reconnaissance inspection commitment by 109, missed
commitment



by 103.









COM1ITMDNT
ACTUAL

CT ME
- 240 78
- 137 82

M/V MI RI VT
85 76 199 52
117 61 204 62
740
•532
91

Region
sampling




I'TtafF
ins pec-






Connecticut, which
its sampling








inspection












                                                     I  -  10

-------
                                   FY 1075 MflNRGEMENT SUMMfiRY REPORT
                           3D WRIER NfDES PERMIT IGGURNCE  HMD COMPLIRNCE-MUNIC1PRL
                            NO. CKM INGfECG OP MfJJOR MUNI  PERMITTEEG-hTH « GTflTE
             GTRRT I EVEl.
0) PLDNNED UNITS    0
X RCTURL UNITS     0
•/, RCTUflL/COMKIT    0
1007
729
 17
1923
1405
 33
2731
2277
 53
3751
3601
 35
            4260
            •1566
             i07
                            NO. 0*M INGPECG OF  MOJ3R MUNI PERMlTTEfG-brR * STflTE
             GTflRT LEVEL
O PLRNNEO UNITS    o
X RCTURL UNITS    .0
V. RCTURL/COMMIT    0
    REMRRKG :  	
 60
 94
 33
120
133
 130
 134
 74
2SO
222
39
                                       223
                                        91
      Region I  completed 228  inspections  against  its  annual  commitment of  250,
      a  911 achievement.  Regional  personnel reported that its inspectors  work
      closely with State and  local  government officials  to see that  the equipment
      and facilities  are properly maintained.
                                            I  -  11

-------
              750
                                   FY  1076 HINRGEMF.NT GUI-IHRRY REPORT
                           3D WRTt'R NPUKG PERMIT ] SGUflNCt H^D  COHPLIRNCE--HUN 1C I PRL
                                NO.  or p.pfl HUNICIPIU nNrciRcuMENT  RCTIONG
                                                                                      T:
             GTflRT LEVEL
o PLRNNED UNITS    o
X RCTURL UNITS     0
7. RCTUflL/COMMIT    0
M4
120
18
290
ooo
             3-13
             •19
            617
            510
             70
             6 CM
                                NO-  Or RPR  MUNIDPfiL ENFORCEMENT OCTIONG
             GTflRT LEVEL
O PLRNNED UNITG   0
X RCTURL UNITS    0
V. RCTURL/COI1MIT   0
    REHRRKS;	
 7
 7
23
12
1 1
A3
13
25
22
71
31
27
37
     Region I  issued  26 Administrative Orders, slightly below its  commitment of  30.
     The Region did not originally commit to  any Notices of  Violations or  Referrals
     to  Justice, but  after 1  case was  referred to Justice during the third  quarter,
     the TQ commitment  was raised to  reflect this 1  Referral.
                                         I  -  12

-------
                                     FY 1976 NflNFIGEMENT SUI1MRRY REPORT
                        3C  WRTER  NPDES  PERMIT I5SURNCE RND COMPLIRNCE  - hEDERRL FRCIl.ITIES
                               NO. FED FRC OPER5 EXRMINED FOR COMPL W/PERMIT PROV .
             STRRT LEVEL.
© PLRNNED UNITS    0
X flCTURL UNIT5     0
7. RCTURL/COMMIT    0
91
107
174
206
44
282
 60
349
336
82
469
510
109
                              NO. FED FflC OPERS EXflMINED FOR COI1PL W/PERMIT PROV
             STRRT LEVEL.
O PLRNNED UNITS    0
X RCTURL UNITS    0
'/. RCTURL/COMMIT    0
    REHflRKS:
 7
 7
23
 13
 9
 30
 19
 16
 53
25
22
73
30
24
00
       Region I achieved 80%  of  its commitment.   Region I  is 1  of 3  Regions where
       no major federal  permittees were found in violation of their  compliance
       schedules.
                                            I  -  13

-------
         250
                            FY  1.Q76 HflNRGE.MENT SUMIin'JY REPORT

               WRTER  PRF.P OF FIGS «, NEC tJF.CI. RRRTIONG FOR EPfi'S WWT PLT CONGTRUCT10N ORTf,
                      NO, FiNni.  EIGG riiEn w/cen ON CONSTRUCTION GRRNTS
     _j w 200
     i"-
     s>°
     *£
     z 5 100
NU
1/1
o

1 1
JUL RUG GE.P OCT NOV DEC JRN F
Jr J-


RPR 11
_ 	 /Tj 	
_ 	 -* 	
JUL R
:=m
JG CF..P
                                                                           o
'io4s
• 75 ° u<
 50 "•'
       GTRRT 1.EVEI
O PLRNNED UNITS 55 62 71 39
X RCTURL UNITG 55 62 63 50
'', RCTURL/COMHIT S3 50 61 6-1
NO, FINflL E1SG F
s£ g .
u.
2: o
2^6-
103 . 103
73 55
71 33
It ED M/CEQ ON CONSTRUCT ION GRRNTG


CD uj
UJ CO
ft- z: 4 -
'I J I'
JUL RUG 5E.P OCT NOV DEC
STRRT LEVEL
O PLRNNED UNITG G 1 1
X RCTURL UNITS 0 1 1
5 7t
t|
JHN FE8 I1DR RPR M

3
J
'/. RCTURL/COMMIT 0 25 Z5 25
REMRRKS :

e>
5 H-
ii: 5c
— ) ^~
°-I'
__ -© 	 <;iOOu. =
- 75 " ^
>f ^ ' r n ^
1g
JUL RUG GLP
	 	 	 5 k
A *
Z 2
50 GO

Region  I  filed 2 final  EISs with  CEQ,  501 of  its committed  level.  All  the
Regions during FY-76  filed 31 final EISs with CEQ, which  is 65% of the  48
committed to be filed in FY-76.   Also, during FY-76, Region I filed  2 draft
EISs with CEQ.
                                    I  -  14

-------
                             Water 5 - Water Supply

                                    National

1.    Number of Water Supply Program grants awarded.                        53

2.    Amount of FY-76 program grants awarded.                               $7.5 million

3.    Number of Water Supply Program grants refused (Pennsylvania,
     Indiana, and American Samoa).                                          3

4.    Amount of FY-76 program grants reallocated.                            $482,300

5.    Number of States and territories expressed intention to assume
     primary enforcement responsibilities.                                 54

6.    Number of States and territories expressed intention not to assume
     primary enforcement responsibilities (Pennsylvania and Indiana).        2

7.    Number of States and territories assumed primary enforcement
     responsibilities as of September 30, 1976.                             0

                                    Region I

1.    Number of Water Supply Program grants awarded.                         6

2.    Amount of FY-76 program grants awarded, including reallocated         $531,200
     funds.
          a.   Connecticut      $ 98,300      d.  New Hampshire
          b.   Maine            $ 78,100      e.  Rhode Island
179,000
176,500
          c.   Massachusetts    $121,600      f.  Vermont          $77,700

     Number of States expressed intention to assume primary enforcement
     responsibilities.

     Number of States assumed primary enforcement responsibilities as
     of September 30, 1976.
                                          I - 15

-------
                      Water 6 - Section 208--Water Quality Management Planning

                                              National

                         Region:    I     II     III     IV     V      VI    VII    VIII   IX     X     Total

1.  Number of areawide
    designations approved
    and funded                     18     14      12     32     32     13     5     22     17    11     176

2.  Amount of funds                                                                                          •
    obligated ($M)               $ 13.24  24.25   17.86  23.00  39.59   9.65  5.79  12.55  14.61  6.56  167.iP

3.  Number of areawide
    work plans completed
    and approved                   15     11      12     26     25      95     21     10    10     144

                                              Region I

1.  Number of areawide designations approved and funded --18

          a.  Connecticut     1  (Statewide Grant)
          b.  Maine           5
          c.  Massachusetts   9
          d.  New Hampshire   2
          e.  Rhode Island    1 (entire State designated as areawide)
          f.  Vermont         0

2.  Amount of funds obligated ($M) -- $13.24M

          a.  Connecticut     1.00
          b.  Maine           1.85
          c.  Massachusetts   6.88
          d.  New Hampshire   0.80
          e.  Rhode Island    2.30
          f.  Vermont         0.41

3.  Number of areawide work plans completed and approved -- 15
                                                  I  -  16

-------
                                         FY  1976 MnNnGEtlliNT  SUItlinRY  REPORT
                                       7  WRTE'R  SPUL PREVENTION  HND  CONTROL.
                                      NO. SPCC PLDN COMPL/IMPL INGPECG
               STORT LEVEL
o PLANNED UNITS   5922
X flCTUHL UNITS    5922
'f. 9CTURL/COMMIT    SO
3301
9759
 S3
9762
12233
 JCM
11818
13289
 112
                                      NO.  SPCC PLflN COMPL/IMPL INGPECS
               GTRRT LEVEL
© PL
X flC
•/. flC
RNNEO UNITS 130
TUflL UNITS 130
TURL/COMMIT 39
REMflRKS >
175 220 334
234 477 61b
70 143 184
Region I completed 615 SPCC plan and implementation inspections against its
commitment of 334. Since 130 inspections were completed in prior years, the
actual number o£ inspections completed during the period from July 1, 1975
through Sept. 30, 1976 totaled 485. This number of inspections is a good
indicator of Region I's conscientious effort in this program. The ;irispection5
inthe Regions were greatly facilitated by the use of aerial photography pro-
vided by the EPA field monitoring group.
                                                   1-17

-------
                                          F'Y 1976 MflNnGEMENT  KUI1M1RY REPORT
                                 9  WRTER  STflTE MONITORING  PROGRflMSs  GUHL1TY flSSURRNCE
                                         NO. OF sTfiTt  LfiBORnroRits Lvoi.unTt.0
                 100
               STflRT LEVEL
O PLflNNEO UNITS     0
X flCTURL UNITS      0
•/. ncTUflL/contiiT     o
20
11
B?.
12
97
                                              84
                                              114
                                         NO. OH STflTE  L.nBORflTORItS tVOLUOTED
               STflRT LEVEL.
CD PL
X flC
7. nc
RNNED UNITS
TURL UNITS
TURL/COMMIT
REMRRKS)
Region I
the EPA
sciously
and, as
seeking
0
0
0
2
3
50

6
6
100
6
6
100

evaluated the central laboratory in each of its 6 States, utilizing
evaluation design to assure uniformity. The Region has been con-
concentrating on lending strong technical assistance to the States;
a result of the laboratory evaluation, the States have been actively
more Regional technical assistance.
                                                         1-18

-------
             to 50000
                                         FY 1976 HflNRGEMENT SUIWIRY REPORT
                              ?c RIR   - FISSURE conPLinNCE WITH FUEL RODITIVE RECULHTIONS
                                      NO GRS  SHMPLES TESTED BY FIELD/LOB METHOD
               STRRT LEVEL
O PLRNNED UNITS    0
X RCTURL UNITS     0
'/. RCTUflL/COMlUT    0
5850
7492
 25
11617
12802
  42
18017
18723
 62
25000
27900.
  92
30250
34950
 US
                                      NO  GOS GRMPLES TESTED BY FIELD/LflB METHOD
               STRRT LEVEL
O PL
X RC
X RC
flNNED UNITS
TURL UNITS
TUflL/COtlMIT
REM.RRK5 i
0
0
0

400
490
25
350
600
30
1400
1095
. 54

2000
1601
80

Region I nearly met its FY-76 commitment for gas samples tested
compliance with fuel additive regulations. The Region reported
of contamination issued represented 0.5% of the samples tested.
to the national average of 0.6%. In addition to contamination
the Region detected 563 general availability, nozzle, and other
of the fuel regulations.
!
2000
1924
95

to ensure
that notices
This compares
violations ,
violations
                                                    I  -  19

-------
             10
                  f-Y 1976 MflNRGlNENT  5UI1HHRY  REPORT
3R fllR   - ENSURE CONTINUED CQHPLIRNCE WITH SIP REQUIREMENTS IN IZDCH
            NO-  I DENT PT SOURCES  IN FINRL  COUP H/fMlSS REGS
                                                                                                TRTI:
X RCTURL UNITS
UJ cl-^UUU
LJ
_i o 20000-
iX tO
2 o 1500!jj 	 =^=^==^^:r^
a: tK
* S 10000-
z:
2 5000-
01
JUL RUG SEP OCT NOV DEC
i *
GTRR'T LEVEL
NITS 13920 . 14531 154






It
JRN FED nnn HPR n
T

13 15959
ITS 13920 J 14333 16904 13060
MMIT 70 75 35 1!

	 _^.JC
	 	

c


•JUL RUG Gtp

16976 10331
17924 13367
00 02
                                                                                                        10
                                                                                                   75 i-c =
                                                                                                        2:
                                                                                                        T^
                                    NO.  IDPiNT PT GOURCFJO  IN FINRL  COMr> W/HMISS REGS
LJ
a:
" o 2000
0 lO
2 o l&GO
2 £K
^ m 1000
*~ K
* 5GO
0
-
.
____^__ — — -e 	
5 	 — — -fi • )t
]l i
OCT NOV DECJ_ JRN FEB linp| DPR 11


	 Q 	
	 K 	
i
TY JUN| JUL




RUG


	 (
•
sr..r
^
Lt
•2.
2
a
: 75 £
50 :-
0
                                                                                                        I—
                                                                                                        UJ
               GTHRT LEVEL
O "LflNNED UNITS 334 025 1025 1125 1194 1235
X RCTURL UNITS 334 009 339 961 939 92-1
7. RCTURL/COHMIT 67
REMflRKS :







74 72 73 75 75

Region I did not accomplish its FY-76 commitment. The failure in achieving
the commitment is in
known sources which
FY-76 commitment to
known sources in the
71 are in compliance
92% of point sources
large part due to a reduction in the inventory of
as of Sept. 30, 1976, stood at 1,121 as compared to an
have 1,236 sources in final compliance. Of the total
Region, 82% are in final compliance and an additional
with schedules. This compares to a national level of
in final compliance and in compliance with schedules.
                                                        I  -   20

-------
            o
            LJ
            o 2000
          S o ISO
              1000
500

 0
                                   r- Y 1 0 7 6  M n M fl 01 H p. N T 5 U H I! f! K V I? E n 015 T
                    30 niR   - KNGURF: CONTINUF.D  caiiPLirwri;. WITH sic  RF.QUIREHF.NTG IN EHCII
                         NO 1DENT PT  Gf?C  OUT OF COM H/n-ll. FK1GG RKQ NOT ON Gr.D    :
                                        — e
                                                                   -e
                                                -iD
                  JUL
        RUG
iEt
OCT
NOV
£
DEc  JflN
PEB
MHH
fl!'R
I1HY
£
JUN  JUL
RUG
             STflRT LEVEL
O PLRNMED UNITG  1396
X RCTURL UNITG   1396
             1 109
             1505
          3] 1
          1506
                  550
                  1330
                           284
                           1406
                               234
                               1226
                         NO 1DFNT PT SRC OUT OF  COM W/PNL EM1GG REQ NOT ON SCO
            GTRRT LEVEl
0 "LflNNED UNITG  333
X RCTURL UNITS   333
              263
              ZS5
          134
          133
                   31
                   123
                            0
                           70
                                0
                                63
    REMFIRKS s
      Region I did  not meet  its FY-76 commitment  for reducing the  number  of point
      sources in violation.   In addition  to the 63  sources  in violation of final
      SIP   requirements,  19  sources  are in  violation of applicable compliance
      schedules.  The 82  sources  in  violation represent   7% of the Known  sources
      in the Region which is the  same violation level reported on  a;national
      basis.                                                               '
                                           I  -  21

-------
              fY  1075 UriNRClHENT SUNPfiRY
3fl fllR  - ENSURE CONTINUED CUHPL I RNCf  HUH
            RNTiriPPlTtD NO ENF flCIG  RY Ep
                                                       IP REQUIREMENTS IN ERCH STfUt
            STRRT l.EVEl
O PLRNNED UNITS    0
X RCTURL UNITS     0
7, RCTURL/COHMIT    0
        225
        21
                    -135
542
532
40
343
730
72
JO'J-1
1031
100
                                         NO t'NF QCTG HY CPO
            STRRT LEVEL
O "LRNNED UNITS
X RCTURL UNITS
•I. RCTURL/COMMIT
REMRRKS :
0
a
0

14
27
3G

23
43
57

44
53
73

60
32
109

75
33
131

      Region  I  exceeded  its FY-76 commitment for  air enforcement actions.   The
      98 actions consisted of 51 Notices of Violation, 45 Abatement Orders,
      and  the initiation of 2 civil/criminal proceedings.  The  States in  the
      Region  also undertook a substantial number  of enforcement actions.  The
      number  of State actions is not  documented here since each State uses  a
      slightly  different definition of what constitutes an. enforcement action.
                                              22

-------
                 Air 3B § Air 6 - Delegation of NSPS and NESHAPS

                                    National

Number of States

          Delegated      Start Level    Commitment     Actual 9/30/76

            NSPS              2             41               23
           NESHAPS            2             33               17


                                    Region I

Number of States

          Delegated      Start Level    Commitment     Actual 9/50/76

            NSPS              05                5
           NESHAPS            15                4


REMARKS:
The Region committed to delegate NSPS and NESHAPS enforcement authority to all its
States except Rhode Island by September 30, 1976.  As anticipated, Rhode Island did
not accept either delegation, and the Region nearly made its commitment with only
Vermont not accepting delegation of NESHAPS enforcement authority.  Region I's
total of 9 delegations during FY-76 is more than any of the other Regions.
                                      I - 23

-------
NHTIONRL
NUMBER IN COHPLIRNCE
>— ro w -t* en
o o o o o
° q^ o o o o
FY 1975 MRNHGEMENT SUHMflRY REPORT
7 RIR - ENSURE COHPLinNCE OF' FED€RRL FACILITIES WITH
NO. FED PT . SOURCES IN COMPLIRNCE WITH SIPS
SIP REQUIREI1ENT
	 ©— ' "
	 ^s^^^^^^^^^^

\ \ \
JUL flUG StP OCT NOV DEC JRN FEB MRR RPR HfiY JUN
	 * 	 	 	 	 	 ..4- j- 	 J

JUL RUG SLP
«
                                                                                  if. 5
                                                                                   it z:
                                                                                   u
                                                                                 50 « S
            STRRT LEVEL
(!) PLRNNED  UNITS  118
X RCTURL UNITS   118
'/. flCTURL/COtlMIT   3G
Ibl
139
43
171
151
49
221
145
44
269
2-19
 78
                                                                              326
                                                                              246
                                                                              75
               5G
                               NO. FED  PT. SOURCES IN CUI1PLIRNCE MITH SIPS
            o
            uj
               20 -
             00
             ZI
-
11 ^"^\
^^v^^^
^•^
~
1 1 1 1
JUL RUG SEP^OCT HOV UEc|jRN FEB fir)R|nPR nRY JUNJ_ JUL RUG SEP^
t-^ ' —
noof £
75 a. -
ZJ
tl_ z:
en ri O
: 50 ° o
s-
0
               10 -
            STRRT LEVEL
0 PLRNNED  UNITS   31
X RCTURL UNITS    31
'/. RCTURL/COMM1T   91
    REMRRKS.
                            32
                            32
                            94
             32
             32
             94
             33
             32
             34
             34
             32
             94
             34
             15
             44
      Region I has  reassessed its  compliance  criteria for federal point sources,
      and  this has  changed  the status for many of these sources.   At  the present,
      only 41% of  its 37  federal point sources were  in compliance with SIPs.   The
      Regional average for  federal  point sources in  compliance with SIPs is 62%.
                                            I -  24

-------
              LJ
              or
                 50
            _. o 200
            a: 
-------
                           FY 1975 MflNRGEKENT GUHIinRY REPORT
                1  PESTICIDES -  ESTRBLISH OPERfiT10 NHL CiTRTE • CERTIf-ICflT ION PRODROME
                          NO- CiTnTE SECT. < cr.RT muir. OPPROVED
a 10
UJ
_.gso
a: a.
Z Q.
2 cc -15
*-• a:
tc uj
Z CD -,~
z: 30
•3
3:
15
Of
1
STRRT

^
ti — 	 "" " v- 	 • 	 '
T
JUL RUG GF..P OCT NOV DEC
3
LEVEL

_jy. „ _ .__, ... -M___ ____ ^
^- — * — "
J"^"^ ^— 	 	
1 1
JRN FEB IWR RPR MRY JUN JUL RUG GEP
4- |^"


il)
'i00|l
7s -' r
10 Q .._!
50 o «
>.'
25
0
CD PLRNNED UNITS 3 12 30 43 S2 S2
X RCTUHL UNITS 3 ^ 10 15 25 JO
v, RCTURL/COMMIT 5 3 1
a 10
UJ
_ 0 g
0 & g
^ z; 4
0
Oi
£.
GTRRT
NO. GTRTE G

-
] i'9 49 50
E.CT . .1 CE'RT PI..RNG RPPROVEO


<"Ji 	 ,___ - . r- __^_ p"y ^ 	 r __^ H\ - ___ f
/
/
S •
1 tj.
JUL RUG GLPj_OCT NOV DEC
LEVEL


—-r— — ""*
JRN FEC Unr? | RPR MRY JUN 1 JUL HUG GLP


£ i—
y; UJ
U. ^
CJ f»
50 u
'""
0
o PLRNNED UNITS o o 6 6 6 5
X flCTURL UNITS 0 0 0 0 0 I
'/. RCTURL/COMMIT 0 0 0 0 0 '17
REMRRKS:

Region  I has 1  State, New  Hampshire,  with  its  plans  approved according
to the  above graph.   However, on  Sept.  28,  1976, the  State of  Maine was
given Federal Register  intent to  approve.
                                    I -  26

-------
            c/5
            z
            o
         rr 1376  MnNnGUiENT SUMMRRY REPORT
PESTICIDES - ENGURE  PROPER USE HND HPPLICRTION OF PESTICIDES
    NO.  USE HND RE-ENTRY  INVEST IGHT ICJNG CONDUCTED
                                                                                  (|uoo° £
                                                                                    75fe§
             GTRRT LEVEL
O PLflNNED UNITS
X flCTURL UNITS
"I. nCTUHL/COMHIT
             LO
             z
             o
  19b
  325
.344
472
 41
499
592
60
791
11BZ
100
1.159
1319
                               NO.  USC. FIND  RE-ENTRY  INVESTIGATIONS CONDUCTED
             STRRT LEVEL
O FLRNNED UNITS
X RCTURL UNITS
'/. RCTURL/COHMIT
REMHRKS>
0
0
0

20
64
53

24
00
67

34
85
71

48
106
83

120
123
103

       Region I exceeded  its FY-76 commitment as  did 9  other  Regions.   Region  I
       conducted  123 investigations  and ranked third among all Regions in  total
       number of  investigations  conducted.
                                              I  -  27

-------
              5000
                                    FY 1976 MflNflGEHENT SUNMflRY REPORT
                     2C PESTICIDES - CONT EFFECTIVE  REGIONAL  FOCUS ON  INDUSTRY  COMPL W/REG REG
                                 NO. OF PRODUCER ESTABLISHMENTS INSPECTED
             STRRT LEVEL
0 PLRNNED UNITS    0
X RCTURL UNITS     0
'/. PCTURL/COI1MIT    0
372
535
23
831
IMS
 50
1278
1802
 79
1718
2264
 99
2290
2685
 117
                                 NO. OF PRODUCER EGTflBL IF.HMUNTS INSPECTED
             STRRT LEVEL
O PLflNNED UNITS
X RCTURL UNITS
7. RCTUflL/COIIMIT
REMRRKS:
0
0
0

15
23
26

37
50
56

52
66
73

• 62
92
102

90
107
119

       Region I exceeded its  FY-76  commitment  with  an achievement  level  of 119i.
       The 107 inspections conducted resulted  in  7  civil  actions and 1 stop sale
       order.
                                              I  -  28

-------
                              P Y 1376 MflNflGE'MENT SUMMflKY REPORT
               1 SOLID NRGTE - DEV ft IMPLEM COMPLEM  GT ft f-EO  GTRRT TO UPORRDE GT GH PR OK
                        MO. GTRTE STRATEGIES FOR CONTROL OF  DlCiPOGRL SITEG
       GTRRT LEVEL.
O PLRNNED UNITG    0
X RCTURL UNITG     0
'f. RCTURL/COMHIT    0
                                     14
                                     11
                        11
41
25
59
                                                                      37
                                                                      32
43
36
                        NO- GTOTH: GTRRTEGIEG  FOR CONTROL or  OIGPOGRL SITEG
       GTRRT LEVEL
O PLRNNEU UNITG    0
X RCTURL UNITG     0
'/. RCTURL/COMHIT    0
    REMRRKS:	
                                                   33
                                                                      5
                                                                      5
                                                                      33
                           33
Region I  had a  commitment  of 6  and  fell 1  short  with  an achievement  level
of  831.   No other Region had a  larger  commitment.than  this  Region; 3  Regions
had  equal commitments.
                                         I  -  29

-------
                                     TY  1976 MRNPIGEMENT SUMMflRY REPORT.
                      1 RRDIRTION - SUPPORT THE DEVELOPMENT  OT STHTE EMERGENCY RESPONSE PLRNS
                                  NO. OP' EMERGENCY RESPONSE PLRNS  COMPLETED
             STflRT LEVEL
O PLRNNEO UNITS   11
X flCTURL UNITS    11
'I. flCTURL/COMMIT   32
21
13
33
35
16
• 34
Zl
62
                                  NO. OF EMERGENCY RESPONSE PLONS  COMPLETED
             STflRT LEVEL
O PLRNNED UNITS
X flCTURL UNITS
'f. RCTURL/COMMIT
REMflRKS =
0
0
0

1 .
el
100

2
3
ISO

2
3
150

       Region  I  exceeded  its FY-76  commitment  with  an achievement  level  of  150%
       This  ranks number  1  among all  Regions.
                                              I  ,-  30

-------
REGION II

-------
        END-OF-YEAR  REPORT--REGIONAL OVERVIEW

                                      REGION II

     During FY-76,  92 output commitments were monitored through the Formal Reporting
System.  Region II  and the States  in  the Region met or exceeded 44 commitments,  nearly
met 12 more, and did not meet 29.   In addition, no commitments were made for 7 outputs

     The Region obligated nearly $923 million of its municipal construction funds
against a commitment of $1,065 million; the percentage achieved (87%) is slightly
above the national  average of 84%.  For FY-77, the Region has $1,417 million in
unobligated P.L. 92-500 funds,  of  which over $1 billion is for New York alone.   This
Region exceeded its initial plans  for total awards with 181 awards, and it was the
only Region to achieve its planned mix of  40%-7%-53%, for Steps 1, 2, and 3
awards.  Region II  did not file any final  or draft construction grant EISs with  CEQ
during FY-76.   However, 1 draft ocean disposal EIS was prepared and filed with CEQ.

     The Region increased its total State  water program delegations to 7,  an
increase of 4, when New York and the  Virgin Islands assumed responsibility for
NPDES and New Jersey for change orders review and interim inspections.  The Region
had expected an increase of 6 delegations  overall.

     Region II reported that 89% of the major nonmunicipal permittees were in
compliance with the compliance schedule requirements of their permits at the end of
FY-76.  This was slightly above the national level of 87%.  The Region and the States
conducted a total of 1,024 reconnaissance  and sampling inspections, nearly achieving
the total number planned and almost twice  the number of major nonmunicipal permittees
in the Region.  These activities resulted  in 59 NPDES enforcement actions against
major and minor nonmunicipal permittees, 34% of the level estimated-by the Region.

     Overall compliance of major municipal permittees with the compliance schedule
requirements of their permits was  reported to be 89%, somewhat higher than the
national level of 82%.   The Region  and the States conducted 2,535 reconnaissance and
sampling inspections,  far exceeding their  total commitment and almost 5 times the
number of major municipal permittees  in the Region.   These activities resulted in 78
NPDES enforcement actions against major and minor municipal permittees.
                                       II - i

-------
     The Region was 31% above the national average for the number of examinations
of federal facility compliance schedules.  One third of its 9 federal facility
permittees were found to be in violation of their compliance schedules.

     The Region has awarded water supply grants to its 2 States and 2 territories
(Puerto Rico and the Virgin Islands), totaling $684,100.  The largest sums went to
its States:  New York with $424,600, and New Jersey, with $156,700.  Both States and
the territories intend to assume primary enforcement responsibilities during FY-77.

     The Region has approved and made grants to 14 Section 208 areawide agencies,
amounting to $24.25 million, of which $18.30 million went to the 6 agencies in New
York.  Of the 14 approved agencies, 11 of them have had their project work plans
approved.  The remaining 3 were given grants only recently and will complete their
work plans within the next few months.

     Region II completed 437 SPCC plan and implementation inspections against its
commitment of 375.  Of the 437 total, 247 inspections were in New York and 172 in
New Jersey.  Regional personnel completed the evaluation of 12 State water pollution
laboratories, although only 8.were committed for FY-76.

     As of September 30,  1976, Region II completed 326 O&.M inspections against its
annual commitment of 333,  just 7 shy of achieving its commitment.

     In the air media, Region II did not meet its FY-76 commitment for bringing
sources into final compliance.  However, the Region had 91% of its known sources in
final compliance and in compliance with schedules at the end of FY-76 as compared to
a 77% compliance level at the end of FY-75.  The Region exceeded its commitments for
field surveillance and enforcement actions taken to ensure point source compliance.
Emphasis was placed on enforcement in Air Quality Control Regions (AQCR) which were
not achieving ambient air quality standards with 91% of enforcement actions taken in
these AQCRs.
                                                                                   •>
     The Region accomplished 50% of its commitment for delegations of NSPS and
NESHAPS programs.   New York and the Virgin Islands have been delegated these programs
                                       II  -  ii

-------
     Region II is 1 of 3 Regions that exceeded its commitment for the number of
federal point sources in compliance with SIPs.  Nineteen percent of its federal
point sources are of unknown status.

     The achievement level for the number of pesticides use and reentry investigations
conducted was the second highest among all Regions, with 144%.   Region II fell
only 8 inspections short of reaching its commitment of 250 producer establishments
inspected.  The success of this Region is also shown with 100% of the State Section
4 Certification Plans approved.  Region II had the second largest number of
applicators certified and trained by States.

     The commitments for both solid waste State strategies for control of disposal
sites and State strategies for hazardous waste disposal were met.  An achievement
level of 100% was reached for the number of federal facilities strategies developed
and number of federal facilities strategies implemented.

     In the radiation program to support the development of State Emergency Response
Plans, Region II met its commitment by obtaining an achievement level of 100%.  This
Region had 5 plans completed, more than any other Region.
                                     II - iii

-------
              5000
                                   FY 1976 MRNRGEMENT SUMMRRY REPORT
                             1  WflTER  - I1UNICIPRL FqdL.ITIES PROGRRM MRNflGEMENT
                                  NUMBER OF CONSTRUCTION ORRNT RHRRDS
            cr
                  ML I  RUG I SLP| OCT I NOV I DEC I JRN [ FEB |  HRR I RPR I MRY I JUN I JUL
                                                         RUG
                                                      jEP
             GTflRT LEVEL
X RCTUflL UNITS
0  152  333  635  905 J178 1616  1372 2346 2669 3004 3322 3977
                                                       4649
             m
             o

             §250
             en
                  NUMBER OF CONSTRUCTION  GRflNT RHRRDS
             STRRT LEVEL
X RCTURL UNITS
    REMRRKS;
11
             0   28   38   57  61   71   83  93  108  162
                                                       181
    The total  awards  exceeded the  original plans for  FY-76  for all  steps.   The
    Region was the  only Region which achieved  its planned mix of awards for the
    year:  40%-7$-53$ planned versus 40% (72)-71(12)-531(97)  actual  for Step 1,
    2,  and 3  awards,  respectively.
                                              II  -  1

-------
                                   FY  1976 MflNRGEMENT SUMMRRY REPORT
                             1  WRTER - HUNICIPRL FflCILITIES PROGRAM MRNRGEMENT
                            DOLLRR VRLUE OF CONSTRUCTION ORHNT RHflRDS (MILLIONS)
             STflRT LEVEL.

O PLflNNED UNITS    0           1088
X flCTURL UNITS     0   219  514  738
'I. flCTURL/COMMIT    0    4   9   13.
                    1653         2261          4643
            893 1157 165Z 1790 1999 2259 2413 2789 4141
             16   20  29   31   35   39  42   49   72
                                                      5739
                                                      4809
                                                       84
                            DOLLRR VflLUE OF CONSTRUCTION GRRNT HHRRDS (MILLIONS)
                                       DEC  JRN
                            FEB
I
                            MRR  RPR
             STflRT LEVEL
O PLRNNED UNITS   0
X RCTURL UNITS    0
7. RCTUflL/COttMIT   0
    REMRRKSi
31
3
    272          262          332          923
74   102  128  134 262  271  289  329  333  402  791
7   10   12   13   25  25  27   31   31   30   74
                         1065
                         923
                         87
     The  Region obligated $923  million for  the year  which  leaves  an unobligated
     balance of $1417  million  for FY-77, an  amount which is  over  501 more  than
     the  Region obligated during the  past 5  quarters.   The percentages of  funds
     obligated for Steps 1  §  2  were  low, again, reflecting the characteristically
     low number of Step 2 awards made.  New York now has an  unobligated  balance  in
     excess of $1 billion.
                                           II  - 2

-------
                       Water 2 - State Program Delegations

                                    National
Approved NPDES Programs
Final Plans § Specs Review
Bid Tabulation Review
Change Orders Review
0§M Manual Review
Interim Inspections
Start 7/1/75

     24
     27
      2
     26
     33
      0
Commitment

    33
    41
    14
    38
    40
     7
Actual 9/30/76

      28
      37
       7
      37
      38
       2
Approved NPDES Programs
Final Plans § Specs Review
Bid Tabulation Review
Change Orders Review
0§M Manual Review
Interim Inspections
      Region II

Start 7/1/75

      0
      1
      0
      1
      1
      0
Commitment

     2
     1
     1
     2
     1
     2
Actual 9/30/76

       2
       1
       0
       2
       1
       1
REMARKS;

NPDES - New York and Virgin Islands now have.
Plans § Specs - Only New York now has.
Bid Tab - New York was planned.
Change Orders - New Jersey and New York now have.
0§M Manual - Only New York now has.
Interim Inspecs - New York and New Jersey were planned; New Jersey now has.
                                       II  - 3

-------
                                   FY  1976 MflNRGEMENT SUMMRRY REPORT
                         3R WRTER NPDES PERMIT ISSURNCE  RND COMPLIRNCE--NON-MUNICIPflL
                         "f. OF HflJOR NON-MUNI PERMITTEES IN COMPLIRNCE WITH SCHEDULES
                                                           	8	J
             STRRT LEVEL.
O PLRNNED UNITS   0
X RCTURL UNITS    0
77
77
79
82
32
96
84
87
85
87
             iu
             o
                         7. OF MflJOR NON-MUNI PERMITTEES IN COMPLIRNCE WITH SCHEDULES
             STRRT LEVEL
O PLRNNED UNITS    0
X RCTURL UNITS     D
67
62
77
78
82
32
86
84
86
89
    REMRRK5:
     This graph indicates the percentage of major  nonmunicipal permittees reported
     to  be meeting the compliance  schedule  requirements  of their  permits.  Region
     II  reported that  89$ were in  compliance at  the end  of FY-76,  slightly ahead
     of  the national  level  of 871.
                                            II  - 4

-------
                                         FY 1376 MRNHGEMENT SUMUflRY REPORT
                              3fl  HRTER   NPDE5 PERMIT  IS5URNCE  RND COMPLIfiNCE-NONMUNICIPRL
                             RECON IN5PEC5 OF MflJOR  (NON-MUNI) PERMITTEE'S BY EPR «, GTflTEG
               STflRT LEVEL.
O PLRNNED UNITS    0
X RCTUflL UNITG     0
'/. nCTURL/COMMIT    0
3145
1783
 13
6174
3607
 25
9304
7082
 50
12391
9137
  65
14153
11301
  00
              UJ
              CJ
                             RECON 1N5PECS OF MRJOR  (NON-MUNI) PERMITTEES BY EPR  «, STRTES
               STflRT  LEVEL
O PL
X RC
'/. RC
RNNED UNITS 0 185 371 552 735 791
TURL UNITS 0 72 167 394 652 779
TURL/COMMIT 0 9 21 50 82 93
REMRRKS:

This graph reflects nonmunicipal reconnaissance inspections performed by EPA staff and by the
States in Region II. The EPA commitment of 140 was exceeded with 173 inspections. Both
New Jersey and New York fell shout of their commitments, while Puerto Rico and the Virgin
Islands exceeded theirs. When the EPA inspections are included, there were sufficient
inspections performed to cover every major permittee.
                                                     II  -  5

-------
              in
              z
              o
5000
                                         FY 1976 MRNRGEMENT SUMMflRY REPORT
                              3fl  HRTER   NPDES .PERMIT  ISSURNCE  RND COMPL IRNCE-NONMUNIC1PRL
                             SAMPLING INSPECS OF MflJf NON-MUNI ) PERMITTEES  BY  EPfl  «,  STflTES
               GTflRT LEVEL
O PLflNNED UNITS    0
X RCTUflL UNITS     0
7. RCTUflL/COMMIT    0
                 914
                 629
                  13
1850
1404
 30
2727
2450
 52
3626
3263
 69
4716
4357
 92
                 250
                             SRMPLING INSPECS OF MRJfNON-MUNI ) PERMITTEES BY EPfl  4  STflTES
               STRRT  LEVEL.
O PL
X RC
•/. RC
RNNED UNITS 0
TURL UNITS 0
TURL/COMMIT 0
REMRRKS:
61 112 161 214 246
49 99 125 174 245
20 40 51 71 100
This graph reflects nonmunicipal sampling inspections performed by Region II staff and by
States in the Region. Overall performance was at planned levels. The Region fell 2 short
its commitment to 160 inspections, and the States in total exceeded their commitment of 86
1 inspection.
. NJ NY PR VI
COMMITMENT - 17 W 6 3
ACTUAL - 18 59 4 6
the
of
by
                                                    II  -  6

-------
                                         FY 1976 MRNRGEMENT  SUMMRRY  REPORT
                             3R WRTER NPDES PERMIT ISSURNCE flND COMPLIflNCE—NON-HUNICIPRL
                                    NO. OF EPR NON-MUNICIPRL ENFORCEMENT flCTIONS
               6TRRT LEVEL.
O PLRNNED UNITS    0
X RCTURL UNITS     0
'/ RCTURL/COMMIT    0
291
121
 44
565
274
 21
867
450
 35
1166
623
 48
1296
764
 59
                                    NO. OF EPR NON-MUNICIPRL ENFORCEMENT RCTIONS
               STflRT  LEVEL
o PL
X flC
7. RC
flNNED UNITS 0 44 88 132
TURL UNITS 0 11 ZZ 37
TURL/COMMIT 0 6 13 21
REMRRKS:
176 176
49 59
28 36
Region II did not meet its commitments for any of the 3 types of NPDES enforcement actions.
Half of the conmitment to 100 Administrative Orders was met, and 9 cases were referred to
Justice, as compared to a conmitment of 36. The Region conmitted to 40 Notices of Violation
(NOV), assuming almost a full year of delegation to New York. No NOVs were issued, however,
as the delegation was made later than planned, and since authority is being turned over to
the State slowly on a permit-by-permit basis.
V
                                                  II  -  7

-------
             £ ioo
                                   FY 1976 MflNflGEMENT SUMMflRY REPORT
                           WflTER 30 NPDE5 PERMIT IS5URNCE RND COMPLIf)NCE--MUNICIPRL.
                         X OF MflJOR MUNICIPRL PERMITTEES  IN COMPLIflNCE HITH SCHEDULES
             GTflRT LEVEL.
O PLfiNNED UNITS    0
X flCTURL UNITS     0
  59
  71
65
64
69
79 v
73
84
90
82
             o
             1 100
'I. OF MRJOR MUNI PERMITTEES IN COMPLI9NCE WITH SCHEDULES
             STflRT LEVEL.
O PLHNNED UNITS    0
X RCTURL UNITS     0
  67
  53
77
67
82
68
86
79
86
89
    REMHRKS;
    This graph indicates  the percentage  of major  municipal permittees  reported to
    be meeting the  compliance schedule requirements of  their  permits.   Region II
    reported  that 89% were  in compliance at the  end of  FY-76.   Nationally,  82%
    were reported in compliance.
                                           II  -  8

-------
                                         FY 1976 MRNRGEMENT SUMI1RRY REPORT
                               3B WRTER  NPDES PERMIT ISSUflNCE RNO COMPLIRNCE-MUNIC1PRL
                               RECON  INSPECG  OF 'MRJORCMUNI)  PERMITTEES  BY  EPR  S,  STRTE5
               STflRT LEVEL.
O PLflNNED UNITS    0
X RCTUfll UNITS     0
'/. RCTURL/COMMIT    0
1902
2274
 18
3890
B05G
 47
5463
8998
 71
7290
12529
  98
12752
15371
 124
                               RECON  INGPECG OF MRJORtMUNI) PERMITTEES BY EPR & STRTES
               STflRT  LEVEL
O PLRNNEO UNITS 0 126 252 378 515 1131
X RCTURL UNITS 0 190 855 943 1702 2428
•1. RCTURL/COMMIT 0 17 76 83 150 215
REMRRKS:








This graph reflects municipal reconnaissance inspections performed by Region II staff
the States in the Region. Region II performed 14 inspections, the same number as its
commitment. The States performed 2,412, exceeding their total commitment of 1,117
Puerto Rico fell short of its commitment. The total of 2,428 inspections is about 4.5
the number of major municipal permittees in the Region.
NJ NY PR VI
COMMITMENT- 730 3l5 62" 10
ACTUAL - 1075 1269 56 14 .




and by

; only
times




                                                      II  - 9

-------
              £ 5000
                                        FY  1976 MRNRGEMENT SUMMRRY REPORT
                               38 WRTER NPDE5  PERMIT  IS5URNCE  RND  COMPLIRNCE-MUNICIPRL
                              SRMPLING INSPECS  OF  MRJOR(MUNI)  PERMITTEES  BY  EPfl  4  STflTES
               STRRT  LEVEL
© PLflNNED UNITS    0
X RCTURL UNITS     0
•I. RCTUflL/COMMIT    0
822
594
 15
1575
1884
 49
2188
2106
 55
3051
2768
 72
3053
3923
 102
                              SRMPLINB  INSPECS  OF  MRJORfMUNIJ PERMITTEES BY EPR  & STRTES
              STRRT LEVEL
© PL
X RC
'/. RC


RNNED UNITS 0
TURL UNITS 0
TURL/COMMIT 0
REMRRKS:
This graph reflects
and by the States in
The States exceeded


22 39 59 84
9 33 54 83
9 34 56 86
the number of municipal sampling inspections performed by
the Region. Region II exceeded its commitment to 60 by 2
their total commitment of 36 by 9 inspections.
NJ NY PR VI
OM1ITMENT - ~6~ "2T 3 ~2"
ACTUAL - 6 35 2 2
96
107
111

Region II staff
inspections .




                                                   II  -  10

-------
                                      FY 1976 MRNRGEMENT SUMMRRY REPORT
                             3B  MRTER  NPDES PERMIT ISSURNCE  RND COMPLIRNCE-MUNICIPRL
                              NO. O&M INSPECS OF MflJOR MUNI  PERMITTEtS-tTfl 4 STflTE
              STflRT LEVEL
O PLflNNED UNITS    0
X flCTURL. UNITS     0
7. RCTUflL/COMMIT    0
                               1007
                               729
                                17
             1923
             HOG
              33
             £791
             2277
              53
             3751
             3501
              05
             4260
             4566
              107
                              NO. 0«M INGPECS OF MRJOR MUNI PERM1TTEES-EPR 4 STflTE
              STflRT LEVEL
o PLRNNED UNITS    o
X RCTURL UNITS     0
•/. RCTURL/COMMIT    0
    REMRRKS:
70
59
18
120
117
35
185
162
49
270
267
80
                                                                                      333
                                                                                      326
                                                                                       98
      Region  II completed  326  inspections,  7  short of achieving  its annual
      commitment of 333.
                                                  II  - 11

-------
              750
                                  FY 1976 MR!
                          3B NRTER NPDES PERMI
                                NO. OF  EPR MUI
               RGEMENT SUMMRRY REPORT
                 ISSUANCE RND  COMPLIRNCE--MUNICIPRL
               ICIPflL ENFORCEMENT RCTIONS
                                                                JUN  JUL  RUG SLT
            STflRT LEVEL.
O PLRNNED UNITS   0
X RCTURL UNITS    0
•/. RCTURL/COMMIT   0
144
129
18
290
222
 30
439
348
48
617
510
70
732
604
83
              250
                                NO. OF  EPR MUNICIPAL ENFORCEMENT RCTIONS
            STRRT LEVEL
O PLRNNED UNITS   0
X RCTURL UNITS    0
•I. RCTURL/COMMIT   0
    REMRRKS:
23
10
 7
51
18
13
79
54
40
104
66
49
134
78
58
      Region  II's Municipal Enforcement  Actions  fell below committed levels  similar
      to the  nonmunicipal effort.   No NOVs  were  issued  to the 1  delegated  State
      although  40 were  planned.   The commitment  to 80 Administrative Orders  was
      nearly  met with  76 issued.   As for Referrals to Justice, 2 of  the committed 14
      were met.   One of these was  reported to be  a landmark case  against  a
      municipality--Camden, New  Jersey.
                                            II - 12

-------
               a 750
                                         FY 1976  MDNRGEMENT  SUMMRRY  REPORT
                          3C WRTER  NPDES PERMIT ISSURNCE RND COdPLIHNCE - FEUERRL FflCIlITIES
                                  NO.  FED FRC  OPER5 ORtllNED FOR COHFL W/PERMIT PROV
                     JUL  RUG  SEP  OCT  NOV
               STRRT  LEVEL
O PLRNNED UNITS    0
X RCTURL UNITS     0
''. RCTUflL/COMIlIT    0
91
107
23
174
206
44
Z49
Z82
60
349
336
82
469
510
109
                                 NO. FED FRO OPERS EXRMINED FOR COMPL W/PERMIT PROV
               STRRT  LEVEL
O PLflNNED UNITS
X RCTUflL UNITS
7. OCTUflL/COHMIT
REMRRKG>


Region
federal
0
0
0

II nearly
facility
15 30 45 60 70
9 25 41 51 67
13 36 59 73 96

met its commitment with a 96% achievement. Of the 9 major
permits issued, 3 were found to be in violation of their
compliance schedules.
                                                    II  -  13

-------
                                     F'Y  1976 MflNRGEMENT SUMMRRY REPORT
                    4fl  MflTER  PREP OF EIS5 ft NEC DECLRRRTIONS FOR EPfl'S HUT PIT CONSTRUCTION CRTS
                               NO. FINRL  EIGG FILED W/CEQ ON CONGTRUCTION ORF1NTS
             CO
             to


-------
                             Water 5 - Water Supply

                                    National

1.   Number of Water Supply Program grants awarded.                        53

2.   Amount of FY-76 program grants awarded.                               $7.5 million

3.   Number of Water Supply Program grants refused (Pennsylvania,
     Indiana, and American Samoa).                                          3

4.   Amount of FY-76 program grants reallocated.                           $482,300

5.   Number of States and territories expressed intention to assume
     primary enforcement responsibilities.                                 54

6.   Number of States and territories expressed intention not to assume
     primary enforcement responsibilities (Pennsylvania and Indiana).        2

7.   Number of States and territories assumed primary enforcement
     responsibilities as of September 30, 1976.                             0

                                    Region II

1.   Number of Water Supply Program grants awarded.                         4

2.   Amount of FY-76 program grants awarded, including reallocated
     funds.                                                                $684,200

          a.   New Jersey       $156,700
          b.   New York         $424,600
          c.   Puerto Rico      $ 77,800
          d.   Virgin Islands   $ 25,100

3.   Number of States and territories expressed intention to assume
     primary enforcement responsibilities.                                  4

4.   Number of States assumed primary enforcement responsibilities
     as of September 30, 1976.                                              0
                                        II  -  15

-------
                      Water 6 - Section 208--Water Quality Management Planning

                                              National

                         Region;    I     II     III     IV     V      VI    VII    VIII   IX     X     Total

1.  Number of areawide
    designations approved
    and funded                     18     14      12     32     32     13     5     22     17    11     176

2.  Amount of funds
    obligated ($M)               $ 13.24  24.25   17.86  23.00  39.59   9.65  5.79  12.55  14.61  6.56  167.10

3.  Number of areawide
    work plans completed
    and approved                   15     11      12     26     25      95     21     10    10     144

                                              Region II

1.  Number of areawide designations approved and funded --14

          a.   New Jersey       7
          b.   New York         6
          c.   Puerto Rico      1
          d.   Virgin Islands   0

2.  Amount of funds obligated ($M) -- $24.25M

          a.   New Jersey       4.55
          b.   New York        18.30
          c.   Puerto Rico      1.40
          d.   Virgin Islands   0

3.  Number of areawide work plans completed and approved --11
                                                II  -  16

-------
                                    FY 1976 MRNRGEMENT SUMMfllU REPORT
                                  7  HflTL'R  SPILL  PREVENTION RNU  CONTROL
                                 NO. SPCC PLRN COMPL/IMPL INGPECS
             STflRT LEVEL
O PLANNED UNITS  5922
X RCTUfll. UNITS   5922
'/. RCTURL/COMMIT   SO
8301
9759
 83
9762
12283
 104
11318
13289
 112
                                 NO. SPCC PLflN COMPL/IMPL INSPECS
             STflRT LEVEL
G PLRNNEO UNITS   75
X RCTURL UNITS    75
'(. RCTURL/COMMIT   ZO
   _REMRRKS.	
 135
 251
 67
 195
 410
 109
 375
 437
 117
     During the period between July 1, 1975, and September 30,  1976,  Region II
     completed  362 SPCC plan inspections,  exceeding its  commitment by 62
     inspections.  This performance level  compares favorably  with the national
     average.
                                             II  - 17

-------
                 100
                                         FY 1976 MRNRGEMENT  SUNMRRY  REPORT
                                   WRTER  STRTE MON1TORINO PRO&RRHS: QURLITY  RSSURRNCE
                                        NO. OF STRTE L.RBORRTORIES EVRLURTED
               STflRT LEVEL
O PLflNNED UNITS    0
X RCTURL UNITS     0
'/. RCTURL/COMHIT    0
20
11
15
62
72
97
.74
 84
114
                                        NO.  OF STflTE LRBORPTORIES  EVRLURTEO
               STflRT  LEVEL
CD PL
X RC
:/. flc
RNNED UNITS 0 3 68
TURL UNITS 0 1 8 12
TURL/COMMIT 0 13 100 ISO
REMRRKS i

Region II was committed to evaluating 8 laboratories and evaluated 12.
Region II utilized the EPA recommended evaluation methodology. Region II
is providing direct technical assistance to these laboratories to correct
deficiencies through training and the State quality control work plans.
                                                  II  -  18

-------
           tn 50000
                                  FY 1976 MDNRGEMENT SUMMRRY REPORT
                         ZC  flIR   - RSSURE COMPLIHNCE WITH FUEL RDDITIVE  REGULHTIONS
                                NO ORS SRMPLES TESTED BY  FIELD/LRB METHOD
            STRRT  LEVEL
O PLflNNED UNITS   0
X flCTURL UNITS    0
'f. flCTURL/COtiniT   0
5950
7492
 25
11617
12802
 42
18017
18723
 62
25000
27900
 92
30250
34950
 116
              5000
                               NO GflS SflMPLES TEGTED BY  FIELD/LRB METHOD
            STRRT LEVEL
O PLflNNED  UNITS   0
X RCTUOL UNITS    0
7. flCTUHL/COMMIT   0
    REHHRK5;	
750
1835
 49
1500
Z16Z
 58
2250
Z633
 70
3000
3004
 80
3750
4023
 107
      Region  II  exceeded its FY-76 commitment for gas samples tested to ensure
      compliance with  fuel additive regulations.   The Regions reported that  notices
      of contamination issued  represented 1.8% of the samples tested.  This  is
      somewhat  higher  than the  national  average  of 0.6%.   In addition to
      contamination violations,  the Region detected 271  general availibilty, nozzle,
      and other  violations of  the fuel regulations.
                                          II  -  19

-------
             3fl flIR
     FT 1976 MRNRGEMENT SUMMRRY REPORT
ENSURE CONTINUED COMPLIRNCE WITH SIP REQUIREMENTS IN EflCH STRTt!
1C 25000
LJ
tt:
§ 20000
fe 1500(jj
a;
£ 10000
oc
z 5000
0
*
NU • lutiMi ri ouLmuta i IN r i NHL Lunr w/.truuo i\ti>o
f 	 	

-
-
JUL
ii



RUG
j>^


i
SEP | OCT
	 ^



NOV




JRN
•



FEB
	 K 	
	 -© — —


i
HRR| RPR

- —



MRY

	 8—


' I
JUN| JUL





RUG
.—1
-

-
-
SEP
o
JlOOz
75 5
a.
50 u.
o
25"
0
            STflRT LEVEL.
o PLRNNED  UNITS  13920         14531
X RCTURL UNITS  13920         14839
7. RCTURL/COMMIT    70           75
                                 15418
                                 16984
                                   35
                       I59S9
                       13060
                         91
16976
179Z4
 90
19831
13367
 92
                       NO. IDENT PT SOURCES IN FINRL COUP W/EMISS REGS
0
a:
£ o 2000
° 10
2 o 1500
££ «
« u 1000
z:
^
z 500
0
^
___ — —<
— — S__-^— - — — 7t

11 1 1
OCT NOV DEc|jflN FEB MRR^ RPR MRY JUN^ JUL RUO SEP
ro en ~J o
o en o en o
X OF PLfiNNINO
COMMITMENT
      STflRT LEVEL
O PLRNNED UNITS
X RCTUHL UNITS
'f. RCTURL/COMMIT
REHHRKS:
1179
1179
67

1354
1Z04
68

1437
1409
SO

1495
1440
82

1592
147Z
84

1762
1557
83

Region II did not accomplish  its FY-76  commitment for  having sources come
into  final compliance.   Of the  1,822  known sources in  the Region,  85% are
in  final compliance, and an additional  61 are  in compliance with  schedules,
This  ds-l'a.bou'fe.jthecsame  as the  national  level  of 921 of  point sources in
final  compliance and  in compliance with  schedules.
                                     II  -  20

-------
                                FY  1976 MRNRGE.MENT SUNMRRY  REPORT
                  3R flIR  - ENSURE CONTINUED COMPLinNCE WITH SIP REQUIREMENTS IN EflCII SFRTE
X RCTURL UNITS
3 2500
CJ
o 2000
ro 1000
:D
z 500
0
STflRT
NU lut.Ni ri t>KL uu i IK uun H/I NL tniiLi rctu NUI UN t>uu

5-=-^

JUL

	
—
"• ...

RUG

\e
~ — •€> 	 .
i
SEP 1 OCT
«£•


~— _

NOV


•"• — • —
~~ — e —

DEc| JflN

	

FEB

X 	
-<»--
HRR| RPR

• -
" 	
MRY

	 X 	
i
JUNJ^ JUL

	 .

nuG

— 	 _>
- — i
SEP
S


I
LEVEL
rS 1396
5 1396


1109
1605


811
1606


559
1330


284
H06


284
1226
£ 250
o
ce
£ o 200
° 10
2 o 150°
0 o:
* | 100
o
z 50
0
^
^.
STHRT



^ — x x
Q^_^ » -J
11 I " — r d) f
OCT NOV DEC.|jflN FEB MflRj^ RPR MRY JUN J JUL flUG SEP
LEVEL

iJ* 1 —
f£
cd c
n- £
«. feo
,»
0 PLflNNED UNITS 160 91 46 24 0 0
X RCTURL UNITS 160 108 112 97 101 92
REMRRKS :
       Region II did not meet its FY-76 commitment for reducing  the  number of
       point sources in violation.   In addition to the 92 sources  in violation
       of  final SIP requirements, 31 sources  are in violation of applicable
       compliance schedules.   The 123 sources  in violation represent  7% of the
       known sources in the  Region which is the same violation level reported
       on  a national basis.
                                        II - 21

-------
                                 FY 1976 MflNRGEMENT SUMMARY REPORT
                   3fl fllR  - ENSURE CONTINUED COMPLIRNCE WITH SIP REQUIREMENTS IN ERCH STflTE
                               RNTICIPRTED NO ENF RCTS BY EPfl
            STRRT LEVEL.
O PLRNNED UNITS    0
X RCTURL UNITS     0
'/. flCTUflL/COtlMIT    0
192
226
21
435
395
3G
842
532
49
843
790
1094
1091
100
            2 250
                               RNTICIPRTED NO ENF RCTS BY EPR
                 JUL RUG  SEP  OCT
            STflRT LEVEL
O PLRNNED UNITS    0
X flCTURL UNITS     0
•I. RCTURL/COMMIT    0
    REMRRKS;	
 19
 20
 21
39
32
34
53
29
31
80
50
53
 95
 164
 173
      Region  II  exceeded  its FY-76  commitment  for air enforcement actions.  The
      164 actions consisted of 42 Notices of Violation, 119  Abatement  Orders, and
      the initiation of 3 civil/criminal proceedings.  With  164 actions,  Region  II
      ranked  second among the Regions  in terms  of total air  enforcement actions
      taken during FY-76.   The States  in the Region also  undertook a substantial
      number  of  enforcement actions.   The number of State actions is not  documented
      here since each State uses a  slightly different definition of what
      constitutes an enforcement action.

                                         II  -  22

-------
Air 3B
Number of States

          Delegated

            NSPS
           NESHAPS
                          Air 6 - Delegation of NSPS and NESHAPS

                                    National
        Start Level

             2
             2
Commitment

    41
    33
Actual 9/30/76

     23
     17
Number of States

          Delegated

            NSPS
           NESHAPS
                                    Region II
        Start Level

             0
             0
Commitment

     4
     4
Actual 9/30/76

      2
      2
REMARKS;
The Region committed to have all its States/territories accept delegation of NSPS
and NESHAPS enforcement authority during FY-76.  Although making considerable progress
with New Jersey and Puerto Rico, the Region missed its commitment with only
New York and the Virgin Islands accepting delegation of both enforcement
authorities.
                                       II - 23

-------
               UJ
               o
                 FY  1976  MRMRGEMENT  SUMMflRY  REPORT
7  RIR   - ENSURE COMPLIRNCE OF FEDERRL FACILITIES WITH SIP REQUIREMENTS
            NO.  FED PT.  SOURCES  IN  COMPLIRNCE MITH SIPS
               STflRT LEVEL.
O PLflNNED UNITS   118
X RCTUflL UNITS    118
'I. flCTURL/COMMIT    36
         1S1
         139
         43
171
161
49
221
145
 44
269
249
 76
•326
246
 75
                                     NO. FED PT. SOURCES IN COI1PL IRNCE MITH SIPS
              glzo
                o
                C->
              0
                i
(3
'0
0
{
0
-
'

JUL



RUG

- 	 0 	
i
SEP|OCT



NOV


j
DEc| JRN
^ 	


FEB

— -e 	
i
MFtRJ. RPR

	

MflY

	 © 	
i
JUN| JUL

	 (
;

1,
SEP
	 3
cn -o a
o en o
* CF PLflNNIN&
COMMITMENT
25
0 .
               STRRT LEVEL
O PLRNNEO UNITS 839
X RCTURL UNITS 899
'/. RCTURL/COMMIT 80 90 90
REMRRKS s
10 10 10
15 15 15
150 150 150
Region II exceeded its commitment by 50%. Seventy percent of its
point sources are either in compliance
This statistic is close to the national
either in compliance with SIPs or on a
»_.. .. 	 , 	 —
with SIPs or on a consent
average, which is 72% for
consent schedule.
26 federal
declaration.
sources

                                                 II  -  24

-------
                                   FY 1976 MRNRGEMENT  SUMIIflRY REPORT
                              ENSURE COMPLIRNCE OF  FEDERflL FflCILITIES WITH SIP REQUIREMENTS
                              NO. FED PT.  SOURCES OUT OF COMPLIRNCE WITH SIPS
             STflRT LEVEL
O PLflNNED UNITS   101
X RCTUflL UNITS    101
112
125
118
123
120
74
121
90
111
82
                             NO. FED PT.  SOURCES OUT OF COMPLIONCE WITH SIPS
            STRRT LEVEL
O PLflNNEO UNITS   3
X RCTURL UNITS    3
     Region II has 3 federal point sources  out of  compliance with  SIPs and  3
     federal point sources out of compliance but on a consent declaration.   These
     6  represent  24% of  the Region's federal point sources,  which  is  about  the
     national average.   Five federal sources in the Region  are of  unknown status.
                                          II  -  25

-------
                                         FY  1976  MflNRDEMENT  SUMMRRY  REPORT
                           1 PESTICIDES - ESTRBLISH'OPERRTIONflL STRTE CERTIFICRTION PROGRfltIS
                                       NO. STflTE  SECT. 4  CERT PLRNS RPPROVED
               STRRT  LEVEL
O PLRNNED UNITS    3
X RCTURL UNITS     3
•/. RCTURL/COMMIT    6
12
4
8
30
10
19
43
15
52
25
48
52
30
59
                                       NO.  STflTE SECT.  4  CERT  PLRNS RPPROVEO
               STRRT  LEVEL.
O PL
X RC
7. RC
RNNED UNITS
TURL UNITS
TURL/COI1MIT
REMRRKS:
Region
October
of New
now is
0
0
0


0
0
0
f?
c.
1.
25
34 4
333
75 75 75
II has 3 States approved for an achievement level of 75%. On
28, 1976, after the close of the transitional quarter, the State
York was given notice of intent to approve. The success of Region II
shown with an achievement level of 1001.
                                                    II  -  26

-------
                2500
                                         F'Y 1976 MRNRGEMENT SUtlNFlRY REPORT
                            2R PESTICIDES - ENSURE PROPER USE FIND RPP.LICRTION OF PESTICIDES
                                    NO-  UGE flND RE-ENTRY INVESTIGATIONS CONDUCTED
               STflRT LEVEL.
O PLRNNED UNITS    0
X RCTURL UNITS     0
''. OCTURL/COMHJT    n
195
325
28
344
472
 41
499
692
 BO
791
1162
100
1159
1399
 121
               o
                                    NO.  USE  RND RE-ENTRY INVESTIGATIONS CONDUCTED
               STRRT  LEVEL
O PLflNNEO UNITS
X RCTUflL UNITS
''. flCTUflL/CONMIT
REMRRKSi


0
0
0

Region II
excellent
a higher
15
10
16

30
36
59

had the second lowest
job and achieved 144%
45
52
85

commitment level;
of its commitment.
60
82
134

however, it
Only one
61
88
144

did an
Region obtained
percentage of commitment.
                                                  II
                       27

-------
                                    FY  1976 MRNRGEMENT SUMMRRY REPORT
                     2C PESTICIDES - CONT EFFECTIVE REGIONAL FOCUS  ON INDUSTRY COHPL W/REG REQ
                                 NO. OF PRODUCER ESTRBLISHI1ENTS INSPECTED
             STRRT LEVEL
O PLRNNED UNITS    0
X RCTURL UNITS     0
•I. RCTURL/COMMIT    0
372
535
23
831
1145
 50
1278
1802
 79
1718
2264
 99
2290
2685
 117
             to
                                 NO. OF PRODUCER ESTflBLISHMENTS INSPECTED
                                                                                    100
             STflRT LEVEL
O PLHNNED UNITS
X RCTURL UNITS
7. RCTURL/conniT
REMRRKSs
0
0
0

50
89
36

100
136
54

150
191
76

200
229
92

250
242
97

       Region II conducted 242  producer establishment  inspections  achieving  97%
       of its commitment.   These inspections resulted  in 30  civil  actions and  7
       stop  sale orders.
                                                II  - 28

-------
              ID
              uj
               rY 1976 MRNRGEMENT GUMMRRY REPORT
1  SOLID WRSTE - DEV «  IMPLEM  COMPLEM  ST 4 FED  STRRT TO  UPGRRDE
         NO. STflTE STRATEGIES  TOR CONTROL OF  DISPOSflL  SITES
                                                                             ST 5W PROGS
             STflRT l.EVEl
O PLRNNED UNITS    0
X RCTURL UNITS     0
7. RCTURL/COMMIT    0
          S
          5
         11
14
IP
24
41
26
53
45
37
82
45
43
96
uj" NO. STflTE STRRTEGIES FOR CONTROL OF OISPOSRL SITES
5 10
UJ
t—
S u. 6
UJ
Oi °^ A
UJ ^
CD
ZI
? z


DC
t



-
_


^^^^
^^^"^
Bitti^^ 1 1 '
T
JUL RUG SEP OCT NOV DEC JRN FEB MRR RPR MRY JUN JUL RUG SEP
: 	 i 	 i 	 i 	 i: 	 S




K | fin

bO
25
0
             STflRT LEVEL
O PLflNNED UNITS
X RCTURL UNITS
7. RCTURL/COMMIT
REMRRKS:
0
0
0

0
0
0

3
3
100

3
3
100

3
3
100

3
3
100

      Region  II met its  commitment  with  an achievement level of  100%.   Only  1
      Region  had  a higher achievement level than Region  II.
                                              II  - 29

-------
                FY 1976 MRNRGEMENT  SUMMRRY  REPORT
1 RROIRTION - SUPPORT  THE  DEVELOPMENT OF STflTE EMERGENCY RESPONSE PLRNS
             NO. OF EMERGENCY RESPONSE PLRNS COMPLETED














CO OU
21
a:

_. a! 40
en
z u-
2° 30
1- OC.
-•
25
0
STRRT LEVEL
O PLRNNED UNITS 2 3 55
X RCTURL UNITS Z 2 35
'/. RCTURL/COMMIT 40 40 60 100



REMHRKSi
Region II met its commitment by obtaining a 100% achievement level, as did
3 other Regions. However, Region II had more acceptable plans completed
than any other Region in FY-76.
                            II  -  30

-------
REGION III

-------
        END-OF-YEAR  REPORT--REGIONAL  OVERVIEW

                                   REGION  III

     During FY-76, 92 output commitments were monitored through the Formal Reporting
System.  Region III and the States  in  the  Region met or exceeded 31 commitments,  nearly
met 18 more, and did not meet 34.   In  addition, no  commitments were made for 9 outputs.

     The Region obligated over $602 million of its municipal construction funds
against a commitment of $790 million;  the  percentage achieved (76%) was below the
national average of 84%.  For FY-77, the,Region has $848 million in unobligated
P.L. 92-500 funds, of which over  $400  million is for Pennsylvania alone.   The total
awards (325) fell short of the Region's initial plans, with half of the awards being
Step 1 awards; this upset the planned  mix  of Steps 1, 2, and 3 awards.   During FY-76
Region III filed 2 final EISs on  construction grants with CEQ, which compares to  a
national average of 3.   The Region  increased its total State program delegations  to
12, an increase of 3 during FY-76;  the State of Delaware received delegation  of
plans and specifications review,  O&M manual review, and change orders review.

     Region III reported that at  the end of FY-76, 89% of the major nonmunicipal  NPDES
permittees were in compliance with  the compliance schedule requirements of their
permits.   This is the second highest compliance level reported by the Regions.  The
Region and the States conducted a total of 1,997 reconnaissance and sampling
inspections, somewhat below planned levels, but more than 3.6 times the number of
major nonmunicipal permittees in  the Region.  These efforts resulted in 85 NPDES
enforcement actions against major and  minor nonmunicipal permittees.   This was well
below planned levels,  which would be expected in light of the high level  of compliance
which was found.

     Overall compliance of major  municipal permittees with the compliance schedule
requirements of their permits was reported to be 67% in Region III.  This compares
to the national level of 82% and  is below  the comparable compliance level for
nonmunicipal permittees in the Region.  The Region and the States performed 2,207
reconnaissance and sampling inspections, more than 5 times the number of  major
municipal permittees.   These efforts resulted in 134 NPDES enforcement  actions
against major and minor municipal permittees.  This was the highest number of
                                       III - i

-------
municipal enforcement actions taken by any Region.  In addition, the Region conducted
17 inspections of federal facility permit compliance and found 6% of its federal
facility permittees to be in violation of compliance schedules.

     During FY-76, Region III completed 589 O&M inspections, far exceeding its
annual commitment.  The upsurge near the end of FY-76 was primarily due to the
inclusion of State activity.  Region III awarded 5 water supply grants totaling
$520,800 to the 5 States expected to assume primacy.  Pennsylvania refused a grant
of $323,000 and notified EPA that it does not intend to assume primary enforcement
responsibilities.

     The Region made 12 Section 208 areawide grants totaling $17.86 million.  All
of its agencies' project work plans have been approved.  Region III completed 202
SPCC plan and implementation inspections against its annual commitment of 192.  The
Region evaluated 7 State water pollution laboratories during FY-76, achieving its
FY-76 commitment.

     For the air compliance outputs during FY-76,  the Region nearly met its
commitment for bringing sources into final compliance.   Region III had 92% of its
known sources in final compliance and in compliance with schedules at the end of
FY-76 as compared to a 90% compliance level at the end of FY-75.  In addition,
Region III has 95% of its 80 federal point sources either in compliance with SIPs
or on a consent declaration.  The Region did not meet its FY-76 commitments for
field surveillance and enforcement actions taken to ensure point source compliance.
However, emphasis was placed on enforcement in Air Quality Control Regions (AQCR)
which were not achieving ambient air quality standards with 93% of enforcement actions
taken in these AQCRs.   The Region did not meet its commitment for delegating the NSPS
and only Virginia and Pennsylvania were granted delegation.  The Region did, however,
nearly meet its commitment for NESHAPS delegation with Pennsylvania,  Virginia, and
the Philadelphia local agency accepting delegation.

     In FY-76, the commitments for all major pesticides programs were achieved.   All
the States in the Region had approved Section 4 Certification Plans.   Only 2 other
Regions reported all State plans approved.   Region III  has also performed well in
enforcement with many civil actions resulting from inspection activities.
                                      Ill - ii

-------
     In the solid waste programs, Region III did not accomplish its commitment for
development of State strategies for control of disposal sites with only 2 States
developing strategies; however, the commitment for State strategies for hazardous
waste disposal was met.  The commitment for number of federal facilities strategies
developed was also accomplished; however,  the strategies have not yet been implemented,

     The Region submitted a change request lowering several output commitments in the
latter part of the third quarter of the fiscal year.  This change request was received
too late to be acted on; however, it has been indicated on the output graphs that
were affected.
                                      Ill  -  iii

-------
             CO
             o
             Of.
             
-------
                                   FY  1976 MflNflGEMENT SUMMPIRY REPORT
                             1  HRTER - MUNIC'IPRL  FRCHITIES PROORRM MFINRGEMENT
                            DOLLnR VRLUE OF CONSTRUCTION GRRNT RWRRDS (MILLIONS)
             5TRRT LEVEL
O PLRNNEO UNITS    0           1008
X flCTURL UNITS     0   219  514 730  893
'I. RCTURL/COMMIT    0    4   9   13  16
                1653          2261       .  4643
            1157 1652 1790.1999 2259 2413 2789 4141
             20   29   31  35   39   42   49  72
5739
4809
 84
                            DOLLRR VRLUE OF  CONSTRUCTION GRRNT RWFIROS fMILLIONGJ
             STRRT LEVEL
O PLflNNED UNITS    0
X RCTUflL UNITS     0
7. flCTURL/COMMIT    0
    gEHRRKS.	
    79           147          267           523
51   03  83  12Z  147  196  233  272  332  394  529
 6   11  11   15   -19  25  29   34   42   50  67
790
602
 76
      The  Region  obligated $602 million  for the  year, which was  below  the  national
      average, and leaves  an unobligated balance of $848  million for FY-77.  This
      amount is over 401 more than the Region obligated during  the past  5  quarters
      The  Region  was next  to the  highest in percentage of funds  awarded  to Step  3
      awards, 971, while the national average was 921.  Pennsylvania has  an
      unobligated balance  in excess of $400 million for FY-77.
                                            Ill - 2

-------
                       Water 2 - State Program Delegations

                                    National
Approved NPDES Programs
Final Plans § Specs Review
Bid Tabulation Review
Change Orders Review
0§M Manual Review
Interim Inspections
Start 7/1/75

     24
     27
      2
     26
     33
      0
Commitment

    33
    41
    14
    38
    40
     7
Actual 9/30/76

      28
      37
       7
      37
      38
       2
Approved NPDES Programs
Final Plans § Specs Review
Bid Tabulation Review
Change Orders Review
0§M Manual Review
Interim Inspections
     Region III

Start 7/1/75

      3
      2
      0.
      2
      2
      0
Commitment

     4
     4
     0
     4
     4
     0
Actual 9/30/76

       3
       3
       0
       3
       3
       0
REMARKS:

NPDES - Delaware, Maryland, and Virginia have; Pennsylvania was planned.
Plans § Specs - Delaware, Maryland, and Virginia have; Pennsylvania was planned.
Change Orders - Delaware, Maryland, and Virginia have; Pennsylvania was planned.
0§M Manual - Delaware, Maryland, and Virginia have; Pennsylvania was planned.
                                     Ill - 3

-------
                                   FY 1976 MRNRGEMENT SUMMARY REPORT
                         3fl WRTER NPUES PERMIT I5GURNCE RND COMPLIRNCE--NON-MUNICIPRL
                         7. OF MflJOR NON-MUNI PERMITTEES IN COMPLIRNCE WITH SCHEDULES
                                                           	g	I
             STflRT LEVEL.
0 PLflNNED UNITS    0
X flCTURL UNITS     0
77
77
79
82
82
86
84
87
85
87
                         'I. OF MRJOR NON-MUNI PERMITTEES IN COMPLIRNCE WITH SCHEDULES
             STflRT LEVEL.
O PLRNNED UNITS    0
X HCTURL UNITS     0
69
S4
76
55
88
33
95
88
95
98
    REMflRKS:
     This graph indicates  the percentage  of major nonmunicipal  permittees reported
     to be meeting  the compliance  schedule requirements  of their permits.   Region
     III reported that 98%  were  in compliance  at  the  end of FY-76, well ahead of
     the national level of  871.
                                             Ill - 4

-------
       LU
           FY  1976 MRNROEMENT SUMMRRY REPORT
3R WRTER  NPDES PERMIT ISSURNCE flND COMPLIflNCE-NONMUNICIPRL
RECON  1NSPEC5 OF  MDJOR  (NON-MUNI)  PERMITTEES BY EPR  & STRTES
        STRRT LEVEL
O PLRNNED UNITS    0
X RCTURL. UNITS     0
7. RCTURL/COMMIT    0
                         3145
                         1783
                          13
                 6174
                 3507
                  25
9304
7002
 50
12391
9137
 65
141S9
11301
 BO
                      f?ECON  INSPECS OF MF1JOR (NON-MUNI)  PERMITTEES BY  EPR «, STflTES
        STRRT LEVEL
O PLRNNED UNITS
X RCTURL UNITS
X RCTURL/COMMIT
REHflRKS:
0
0
0

360
12
1

722
625
36

108-1
1193
68

1447
1170
67

1743
1464
84

*This graph reflects nonmunicipal reconnaissance inspections performed by Region Ill^and T5y~
the States.   Region III achieved 53% of its commitment by making  32  inspections against a
commitment of 60.   The low number of EPA performed inspections was offset by a high number
of inspection, 1,464, performed by  the  States.   Overall there were 2.69 inspections per
major permittee, the third highest  such ratio among the Regions.  Four of the States did
not meet their commitments.
*A change request which was submitted in late March would have lowered the Region*s commit-
ment.  This  request was received too late to be acted upon.
                                            IU  -  5

-------
                                         FY 1976 MRNRGEMENT SUMI10RY REPORT
                              39 WflTER  NPDES PERMIT ISSURNCE RND COI1PL IflNCE-NONMUNIC IPRL
                             GflttPLINO  1NOPEC5 OF  MfU( NON-MUNI )  PF-RMITTEfS  BY  EPfl  S.  STRTES
               GTflRT LEVEL
O PLflNNED UNITS    0
X RCTUflL UNITS     0
7. RCTURL/COMMIT    0
914
629
 13
1850
H04
 30
2727
2450
 52
3626
3263
 69
4716
4357
                             S9MPLING  INGPECS  OF  MRJINON-MUNI)  PERMITTEES  BY  EPH  &  STRTES
               STRRT LEVEL
O PL
X RC
'I. F1C
flNNED UNITS 0 96 196 283 379 S29
TURL UNITS 0 16 168 429 444 533
TURL/COMMIT 0 3 32 81 84 101
REflflRKS:
This graph reflects norununicipal sampling inspections performed by
States in the Region. Region III staff performed 119 inspections,
125 inspections. The States performed a total of 414 inspections,
ment .
DE DC MD PA VA WV
COMMITMENT - 90 10 41 3CT 190 37
ACTUAL - 76 12 52 41 206 27
Region III staff and by the
951 of its commitment to
10 more than their commit-
                                                   III  -  6

-------
                2500
                                        FY  1976 MRNflOEMENT GUMMRRY REPORT
                             3fl WRTER NPDES PERMIT ISSURNCE  RND COHPLIRNCE--NON-MUN1CIPflL
                                    NO.  OF  EPfl  NON-MUNICIPflL  ENFORCEMENT  flCTIONG
               STflRT  LEVEL
O PLRNNED UNITS    0
X RCTURL UNITS     0
7. RCTURL/COMMIT    0
231
121
44
565
274
 21
067
450
 35
1166
623
 43
1296
764
 59
                                    NO.  OF  EPF)  NON-MUNICIPFIL  ENFORCEMENT  DCTIONS
                               SEP  OCT  NOV  DEC
               STflRT  LEVEL
(D PLflNNED UNITS
X RCTUHL UNITS
•I. RCTUflL/COMMIT
REMRRKS:





Region I
Actions .
high. A
The July
at which
0 101 191 292 330. 304
0-7 13 ZZ 62 85
0 23. G 16 22

II did not meet any of its 3 commitments for Nonmunicipal Enforcement
The Region's original commitment to Administrative Orders was too
change request was submitted after March 31, too late for approval.
commitments sought in that change request are about the same levels
Region III ended the year.
                                                      in  -  7

-------
                                   FY 1976 MflNRGEMENT SUMMHRY REPORT
                           WRTER 3D MPDES  PERMIT  IG5URNCE RND COI1PLIRNCE —MUNIC1PRL
                         'f. OF HflJOR nUNICIPfll. PERMITTEES  IN COMPI. IRNCE HITH SCHEDULES
             STRRT LEVEL.
O PLRNNED UNITG    0
X nCTURL UNITS     0
59
71
65
69
79
73
84
                           'I. Or MRJOR MUNI  PERMITTEES IN COMPLIRNCE WITH SCHEDULES
             STRRT LEVEL.
O PLRNNEO UNITS
X RCTURL UNITS

    REMflRKS:
                 0
                 0
30
53
35
50
40
66
40
63
67
     This  graph  indicates  the percentage of major municipal  permittees reported  to
     be meeting  the compliance  schedule requirements  of their permits.   Region  III
     reported that  67% were in  compliance at  the end  of FY-76, whi.chr.is  below the
     national level of 821.
                                            Ill -  8

-------
                                      FY 1976 MRNRGEMF.N1  GUNMRRY REPORT
                             3B WflTER  NPDE5 PERMIT IGGUF1NCE  RNU COMPL1RNCE.-MUNICIPRL
                             RF.C.ON INGPEXS OP MnjORfMUNlJ PFRMITTL'LS  BY EPR « GTRTES
              GTRRT LEVEL
0 PLRNNED  UNITS    0
X RCTURL UNITS     0
'/, RCTURL/COMMIT    0
1902
2274
 18
3B90
6056
 47
5463
0998
 71
7290
12529
 90
12752
1E-S71
                             RECON INGPECG OP MflJORfMUNIJ PERMITTEES BY EPR t STHTES
              STflRT LEVEL
O PLRNNED UNITS    0
X RCTURL UNITS     0
•/. RCTURL/COMMIT    0
    REttflRKS :
 67
 •8
  0
 132
1040
 52
201
117Z
 53
 270
 1563
 78
2006
1950
 98
      This graph reflects  municipal reconnaissance inspections  performed by Region III staff and by
      the States in  the  Region.   Region III performed 46  inspections, 5 more than its commitment.
      The States performed 1,912 inspections, 53 less than  their total commitment.   Only the
      District of Columbia and Virginia met their  commitment.  The total of 1,958 inspections  is
      more than 4.7  times  the number of major municipal permittees in the Region.
                                         DE       DC   MD     PA     VA   '   WV
                          COMMITMENT-  243        5    750    600    317     30"
     	ACTUAL      -  230       10    714    582     541     35	
                                                 III  -  9

-------
                                       FY 1976 hflNRGEMENT  SUMMRRY REPORT
                              3B HRTER  NPDES PERMIT I5SURNCE  RND COMPlIRNCE-MUNICIPRL
                             SRMPLINO IN5PECS OF MRJORtMUNI) PERMITTEE'S BY EPR f. STflTES
              STflRT LEVEL.
G PLRNNEO UNITS     0
X RCTUflL UNITS.     0
'< RCTURL/COMM1T     0
822
594
 IS
ib75
1864
2188
2106
3051
2768
 72
3353
3923
 102
                                       .-.• •:•:•'- :-•  v's >*••••  '"-".  ^  '•••••-•• • ...•  •••,. ,  .-,'ji?r.-.
                                      tNSPECS OF HnJORfMUNl)  PERMITTEES PY EPH f. STRTEG
              STflRT LEVEL.
O PLRNNED UNITS     0
X RCTURL  UNITS      0
V. RCTURL/COMMIT     0
    REMRRK5:	
90
                                              187
               283
               381
               199
               42
               477
               244
               51
      This  graph reflects  tlie number of municipal sampling inspections performed by Region III
      staff and by the States in the Region.   Region III performed 23 inspections, 1 less  than its
      commitment.    The States performed  221  inspections,  considerably less than their total
      commitment of 453.
                                              DE    DC   MD    PA   VA    WV
                               COMMITMENT   -  160    5   60    19   184   25
                               ACTUAL       -   25    5   47    23    89   32
      Data^for the first  3 quarters was incorrectly reported by Region III and is not shown on the

                                                     III   -  10

-------
            5 5000
                                   FT 1976 MHNRGEMENT SUMHRRY  REPORT
                           3B WRTER NPOES PERMIT IGSURNCE flND COMPL1RNCE-MUNICIPRL
                            NO. 0*M INSPECS Or MflJOR MUNI PERMITTEtG-tTR «, STRTE
             STflRT LEVEL.
O PLRNNED UNITS    0
X RCTURL UNITS     0
''. RCTURL/COMMIT    0
      1007
      729
       17
              1923
              1406
               33
                       2791
                       2277
                        53
                               3751
                               3601
                                35
                                        4260
                                        4566
                                        107
             CO
             UJ
             10
                            NO. 0
-------
                                      FY 1976 MRNRGEMENT SUMMRRY REPORT
                             3B WRTER NPDES PERMIT  ISSURNCE RND COMPLIRNCE--MUNICIPRL
                                   NO. OF EPR MUNICIPAL ENFORCEMENT RCTIONS
              STRRT LEVEL
O PLRNNED UNITS    0
X RCTURL UNITS     0
% RCTURL/COMMIT    0
144
129
18
290
222
 30
439
348
48
617
510
 70
732
604
 83
                250
                                   NO. OF EPR  MUNICIPRL ENFORCEMENT RCTIONG
              STRRT LEVEL
O PLRNNED UNITS    0
X RCTURL UNITS     0
7. PCTURL/COMMIT    0
    REMRRKS:
31
16
12
57
34
25
83
49
36
129
125
91
137
134
98
      *Region III met 2 of  its  3 commitments for Municipal  NPDES Enforcement Actions.   Six cases
      were referred to Justice,  the same as the commitment.   Region III issued the highest number
      of Municipal Administrative Orders of any Region,  119,  exceeding its commitment by 13
      issuances.  Nine NOVs were issued to the 3 delegated  States, well below the commitment of 25.
      *A change request lowering several of these commitments was submitted late in March.   This
      This request was received too late to be acted upon.
                                                  Ill  - 12

-------
                                         FY 1376 MflNRGEMENT SUnitHRY REPORT
                          3C HRTER   NPDES  PERMIT  ISSUANCE  flNIJ COHPLIRNCE  - FEOERRL  FflCIt.ITIES
                                  NO. FED FRC  OPERS EXRMINED FOR COMPL  W/PERMIT PROV
               STRRT LEVEL
o PLRNNED UNITS    o
X flCTURL UNITS     0
'/. RCTURL/COMMIT    0
91
107
23
174
206
44
249
282
60
349
336
82
469
510
109
                                  NO.  FED FRC OPERS EXRMINED FOR COMPL W/PERMIT PROV
               STflRT LEVEL.
O PL
X RC
7. RC
RNNED UNITS 0 6 13 19 26
TURL UNITS 0 3 4 4 11
TURL/COMMIT 0 12 15 15 42
REMRRKSi
*Region III achieved 651 of its commitment compared to a
1091. However, only 2 of its 32 major federal facility
to be in violation of their compliance schedules.
*A change request lowereing this commitment was received
request was received too late to be acted upon.
26
17
65
Regional average of
permittees were found
late in March. This
                                                    III  -  13

-------
                                    FY 1976 rmNRGCMENT SUMMflRY REPORT
                    4R WflTER  PREP OF  EISS * NEG OECLRRRTIONS FOR EPR'S WWT PIT CONSTRUCTION  ORTG
                              NO. FINF1L EISG FILED W/CEQ ON CONSTRUCTION DRRNTS
O PLflNNED UNITS
X RCTUflL UNITS
"'. RCTURL/COHI11T
1/3
u 200-
°150-
LU
§ 100-
50tJ 	 	 9 =
0 1
JUL RUG SEPJOCT N
\ r *•
STRRT LEVEL.
5 55 62
55 62
F 53 60





CD
5 i—
• ps
j i—
o. ^
	 	 © 	 	 d) 1 0 0 ,. £
	 -©— 	 • f J3 ci
	 fa. 	 	 	 ,, 	 »* 	 • 	 	 75 LJ
= 	 K 	 — 	 r
'
JRN FEB MOR
5

- 50"'
tl n
RPR MflY JUN 1 JUL RUG SEP
•or ^f

71 89 103 103
63 66 73 86
61 64 71 83
                              NO. FINflL EIGG  FILED W/CEQ ON CONSTRUCTION  GRRNTS
co iu
g 2 8
z ^
2^ 6


Z
2
0
T

-

-
__ — o- —
— ~~ ' }f


OCT N


	 -e- —
	 — e —
^^.— -
>/ , , \f^^

1 I
3V DEc| JflN FEB HHRJ^ RPR n

m ^T 	 	 /



^~-^~

-
1
qy JUN 1 JUL RUG CEP
	 st 	 .. v

             STRRT LEVEL.
O PLRNNED UNITS
X RCTURL UNITS
'f. RCTURL/COMMIT
REMRRK5 i
4
4
50

5
4
50

5
4
50

7
4
50

8
6
75

8
6
75

     Region  III has  made  751  of its  commitment,  which compares  to the national
     average  of 83%.   The Region has 7 draft  EISs  filed with CEQ.
                                              Ill -  14

-------
                             Water 5 - Water Supply

                                    National

1.    Number of Water Supply Program grants awarded.                        53

2.    Amount of FY-76 program grants awarded.                               $7.5 million

3.    Number of Water Supply Program grants refused (Pennsylvania,
     Indiana, and American Samoa).                                          3

4.    Amount of FY-76 program grants reallocated.                           $482,300

5.    Number of States and territories expressed intention to assume
     primary enforcement responsibilities.                                 54

6.    Number of States and territories expressed intention not to assume
     primary enforcement responsibilities (Pennsylvania and Indiana).       2

7.    Number of States and territories assumed primary enforcement
     responsibilities as of September 30, 1976.                             0

                                    Region III

1.    Number of Water Supply Program grants awarded.                         5

2.    Amount of FY-76 program grants awarded, including reallocated
     funds.                                                                $520,800

          a.  Delaware              $ 76,700   d.   Pennsylvania   (refused grant
          b.  District of Columbia  $ 75,600                       of $323,000)
          c.  Maryland              $103,700   e.   Virginia       $172,400
                                               f.   West Virginia  $ 92,400

3.    Number of States expressed intention to assume primary enforcement
     responsibilities.  (Pennsylvania refused grant and does not intend to
     apply for primary enforcement responsibilities.)                       5

4.    Number of States assumed primary enforcement  responsibilities as of
     September 30, 1976.                                                    0
                                      III - 15

-------
                      Water 6 - Section 208--Water Quality Management Planning

                                              National

                         Region:    I     II     III     IV     V      VI    VII    VIII   IX     X     Total

1.  Number of areawide
    designations approved
    and funded                     18     14      12     32     32     13     5     22     17    11     176

2.  Amount of funds
    obligated ($M)               $ 13.24  24.25   17.86  23.00  39.59   9.65  5.79  12.55  14.61  6.56  167.10

3.  Number of areawide
    work -plans completed
    and approved                   15     11      12     26     25      95     21     10    10     144

                                             Region III

1.  Number of areawide designations approved and funded -- 12

          a.   Delaware                2
          b.   District of Columbia    1
          c.   Maryland                1
          d.   Pennsylvania            2
          e.   Virginia                5
          f.   West Virginia           1

2.  Amount of funds obligated ($M) -- $17.86M

          a.   Delaware                1.63
          b.   District of Columbia    3.55
          c.   Maryland                1.19
          d.   Pennsylvania            5.54
          e.   Virginia                5.15
          f.   West Virginia           0.80

3.  Number of areawide work plans completed and approved --12
                                               III -  16

-------
                                         FY  1976 MflNRGEHENT  SUMHRRY  REPORT
                                       7   WRTER   SPILL  PREVENTION  RND  CONTROL
                                     NO.  SPCC PLRN COMFL/IMPL  INSPECS
© PLRNNED UNITS
X RCTUF1L UNITS
'/. RCTUHL/COMMIT
976Z
12283
 104
1I8I8
13209
 112
                                     NO. SPCC PLflN COMPL/1I1PL INSPECS
               5TRRT  LEVEL.
O PLflNNED UNITS
X flCTURL UNITS
7. RCTURL/COnniT
REMRRKSi


As of
0
0
0

Sept.
inspections
53
113
59

30, 1976, Region III completed
, exceeding its commitment by 10
120
169
83

202 SPCC plan
inspections .
192
202
105

and implementation

                                                   III  -  17

-------
                 100
                                        FY  1976 MRNRGEHENT SUMMRRY REPORT
                                9   HRTER   STflTE MONITORING PROORF1MS: GURLITY RSSURRNCE
                                       NO.  OF STRTE  t.RBORRTORIES  LVRLURTED
               STflRT  LEVEL
G PLRNNED UNITS    0
X RCTURL UNITS     0
"I. flCTUflL/COMMIT    0
20
11
15
62
12
97
74
84
114
                                        NO.  OF  STflTE  LRBORPTORItS  EVOLURTEO
               STRRT  LEVEL
O PL
X RC
'.'. RC
RNNED UNITS 0
TURL UNITS 0
TURL/COHMIT 0
REMRRKS:
Z 67
1 6 7
14 86 100
Region III evaluated its 7 major. State laboratories, utilizing the EPA
methodology. To promote better quality assurance, Region III designed
workshops to meet individual State needs, and has recently completed a
successful pilot project in which EPA and the State of Pennsylvania combined
resources (50% each) to conduct a training course in quality assurance.
                                                    III  -  18

-------
  
-------
                                  FY  1976 MRNRGEMENT SUMMRRY REPORT
                   3R fllR   -  ENSURE CONTINUED COMPLIRNCE WITH SIP REQUIREMENTS IN EflCH STRTE
                             NO. IDENT PT SOURCES  IN FINRL COUP H/EMISS REGS
UJ £OUUU
(_)
_i o 20000
a: i«
2o 1500(j
z m 10000
T:
:a
z 5000
0

w 	 	 	 -"T^Hr~!ZS- 	
1 1
JUL flUG SEp|oCT NOV DEc|jRN

	

FEB


— -e 	
|
MflR 1 RPR
	 sfc 	


— 	

hflY


	 Q —
I
JUN| JUL




RUG

,—j
• 	 7
-
SIP
	 S

cs
)IOOz ,
c is
75 5 =
a. -
50 u. =
°S
C-^?
0
            STflRT LEVEL
O PLflNNED UNITS  13920         14531
X flCTUflL UNITS  13920         M839
X RCTURL/COMMIT    70           75
15-118
16984
 85
15959
18060
 91
16976
17924
 90
19831
18367
 92
(/i
uj 5000
CJ
ct
3 o 4000
0 10
2 o 3000
£^
^ m 2000
z 1000
0
J
STRRT
NU . lutNi ri suuKLtu in I-INHL uunr w/tnibu Ktuti

OCT N
LEVEL
O PLRNNED UNITS Z029 2125
X RCTURL UNITS 2029 2243
•/. RCTUflL/COHMIT 80 83
REMRRKS:

JRN F

2218
2235
88



RPR M

2239
2492
98



JUL RUO SEP

ra cn -o o
o cr o in o
X CF PLRNNING-
COnMITHENT
2371 2544
2S26 2302
99 90

      Region III  nearly met  its FY-76  commitment for  having sources come  into
      final compliance with  a 90%  accomplishment level.   Of its  2,750 known
      sources,  84%  are in  final compliance,  arid 8% were  in compliance with
      schedules as  of Sept.  30, 1976.   The Region's overall compliance level of
      92%  is the  same as the compliance level  on a national basis.
                                           Ill - 20

-------
            o
          o u-
          >-. O
          a: ft:
2500

2000

150

1000

 500

  0
                                   F'Y 1976 MflNflGLMENT SUMMRRY REPORT
                    3fl HIR  - ENSURE CONTINUED COMPLIANCE WITH SIP REQUIREMENTS  IN ERCH SUITE
                         NO IDENT PT SRC OUT OF COM W/FNL EMISS REO  NOT ON SCO
                                        —e
                                                      -©-
                                                                               -.0
                  JUL
         RUG
OCT
NOV
DEC  JRN
FED
MflR  HPR
MflY
JUN  JUL
RUG
3LP
             STflRT LEVEL
O PLRNNEO UNITS  1396
X RCTUflL UNITS   1396
              1109
              1605
          811
          1606
                  559
                  1330
                           284
                           1406
                               234
                               1226
                         NO IDENT PT GRC OUT OF COM W/FNL EMISG REQ NOT ON SCO
            STRRT LEVEL
O PLflNNED UNITS   34
X RCTURL UNITS    34
               24
               86
           16
           74
                                0
                               148
                                        0
                                        141
    REMRRKSj
       Region  III did  not meet  its FY-76 commitment  for reducing the  number  of
       point sources in violation.   In addition to the  141 sources in violation
       of final SIP requirements, 85  sources  are in  violation  of applicable
       compliance schedules.  The 226  sources  in violation represent   8% of  the
       known sources in the Region which is slightly higher  than the  1% violation
       level reported  on a national  basis.
                                            Ill -  21

-------
                                 FY 1976 MRNRGEMENT SUMMRRY REPORT
                   3fl RIR  - ENSURE CONTINUED COMPLIRNCE WITH SIP REQUIREMENTS IN ERCH STRTE
                               RNTICIPRTED NO ENF RCTS BY ETR
            STRRT LEVEL.
O PLflNNED UNITS    0
X RCTUflL UNITS     0
'/. RCTURL/COMMIT    0
192
226
21
435
395
36
642
532
49
843
790
72
1094
1091
100
                               RNTICIPRTE'D NO ENF RCTS BY EPR
            o
            STRRT LEVEL.
O PLflNNED UNITS
X RCTURL UNITS
'/. RCTURL/COMMIT
REMRRKS:
0
0
0

25
29
29

50
41
41

75
48
48

100
61
61

100
76
76

      Region  III  did not meet its FY-76  commitment  for air enforcement actions.
      The 76  actions consisted of 35 Notices of Violation, 40  Abatement Orders,
      and the  initiation of  1 civil/criminal proceeding.    The States in  the
      Region  also undertook  a substantial number  of enforcement actions.  The
      number  of  State actions is not documented here since each State uses  a
      slightly different definition of what constitutes an enforcement action.
                                        Ill - 22

-------
                 Air 3B § Air 6 - Delegation of NSPS and NESHAPS

                                    National

Number o£ States

          Delegated      Start Level    Commitment     Actual 9/30/76

            NSPS              2             41               23
           NESHAPS            2             33               17


                                   Region III

Number of States

          Delegated      Start Level    Commitment     Actual 9/30/76

            NSPS              04                2
           NESHAPS            03                3
REMARKS:
Region III missed its FY-76 commitment for the delegation of NSPS enforcement
authority and made its commitment for delegation of NESHAPS enforcement authority.
The Region did make delegations of both these authorities to Virginia and the local
agency in Philadelphia, as well as delegating the NESHAPS enforcement authority to
the State of Pennsylvania.
                                     Ill - 23

-------
             LU
             O
                     7  RIR
               500
                                   FY 1976 MRNF1GEMENT SUMMflRY REPORT
                             - ENSURE  COHPLIFINCE OF FEDERRL FflCIL ITIEG WITH GIP REQUIREMENTS
                                NO. FED PT . SOURCES IN COMPLIflNCE WITH SIPS
                                                                               	$100 I £
                                                                                     a: F
                                                                                   75 a.

                                                                                   50

                                                                                   25

                                                                                    0
                                                                                       z:
                                                                                     5S
             STRRT LEVEL.
O PLflNNED UNITS   118
X flCTURL UNITS    118
V. OCTUflL/COnniT   36
                             151
                             139
                             43
             171
             161
             49
            221
            145
             44
            269
            249
             76
             326
             246
             75
                                NO. FED PT. SOURCES IN COMPL10NCE WITH SIPS
                                                                                  t>100
             STflRT LEVEL
O PLHNNED UNITS
X flCTUflL UNITS
'/. flCTUflL/COMMIT
   .REMflRKSs
                10
                10
ZO
20
27
ZO
27
35
50
16
22
74
56
76
74
66
89
       Region  III has  80 federal point sources.   This represents the  second  highest
       number  of sources for  all the Regions.  Region III  has  95% of  its federal
       point sources either in compliance  with SIPs or on  a consent declaration.
       The  Regional average was  considerably  higher than the national  average.
                                            Ill  -  24

-------
      FY  1976  HflNflGEHENT  SUMMfiRY  REPORT
ENSURE COI1PLIRNCE OF FEDERRL FACILITIES WITH SIP REQUIREMENTS









01 NU - r tu 1 1 • &UU
(_>
CK
_j § 200
 30
Qi
o? ^j 20
z:
^ IOC
0
^


-
.

-

»—-==- ^
i
JUL RUG SEP| OCT NOV DEC^
STRRT LEVEL





	 -e- -
K- — — —
^ -^-—-
ti
JRN FEB MRR| RPR ri

0 PLflNNED UNITS 10 12 15 20
X RCTUPIL UNITS 10 15 15 7






REHRRKS:
Sixteen percent of Region Ill's
with SIPs. However, 10 of these

N 1 1 N D 1 r D




{T.
	 X— 	

JUL R

121
90
WITH SIPS




	 © 	

jf

i
IY JUN| JUL R

26
15







, 	 . , ,j

JG SEP





)


111
82





	 (
_

	 	 __j

JG SEP
	 	 _J




)





26
13

federal point sources are out of compliance
out of compliance federal sources are on a
consent declaration. Out of these 10, 2 of the federal sources are in viola-
tion of their consent declaration. Only 1 of the
sources is of unknown status.

Region's 80 federal point


               Ill  -  25

-------
                                         FY 1976 MHNRGEMENT SUMI1RRY REPORT
                           1 PESTICIDES  -  ESTRBLISH  OPERRTIONRL  STflTE.  CERTIF ICRT ION  PROGRRI1S
                                       NO. STRTE SECT.  4  CERT  PLRNS APPROVED
               STRRT LEVEL.
O PLRNNED UNITS    3
X RCTUflL UNITS     3
•[. RCTURL/COMMIT    6
                  12
                   4
                   8
                  30
                  10
                  19
                                                  43
                                                  15
                                                  29
                                52
                                25
                                     52
                                     30
                                     59
                                       NO- CTRTE SECT.  4  CERT  PLRNS  RPPROVED
                o 10
                UJ
                >
              s
Z.  8
o_
o    c
S £
                  ©
                                                 ©
                                                                                ©
                     JUL
           RUO
SLP  OCT
                            NOV
DEC  JRN
FEB
MRR  RPR
               STRRT LEVEL.
O PL
X RC
7. RC
3NNED UNITS 1 6 6 6.6 6
TURL UNITS 1 1 1 1 4 6
TURL/COMMIT 17 17 17 17 67 100
REMRRKS:
Region III reached its commitment by obtaining an achievement level of
100%. This ranks Region III at the top with 2 other Regions. Furthermore,
this Region had more State Section 4 Certification Plans approved than
any Region.
                                                    Ill  -  26

-------
                                   FY  1976 MflNRGEMENT SUMMflRY REPORT
                        2fl PESTICIDES -  ENSURE PROPER USE CINO RPPLICRTION OF  PESTICIDES
                               NO. USE  RND RE-ENTRY INVESTIGRTIONS CONDUCTED
             STRRT LEVEL
O PLRNNED UNITS
X RCTUflL UNITS
7.
             ID
             z
             o
0
0
0
19&
325
28
344
472
41
499
692
60
791
1162
100
1159
1399
121
                               NO. USE FIND RE-ENTRY INVESTIGATIONS  CONDUCTED
             STRRT LEVEL
O PLRNNEO UNITS
X PICTURE UNITS
7. RCTURL/COtlMIT
REMHRKSi
0
0
0

15
14
14

30
26
26

. 45
33
33

100
39
39

100
109
109

       Consistent  with most Regions, Region III  exceeded its  commitment and
       inspected 9 more  establishments  than it  had planned  (an achievement  level
       of  109%).   Only 3 Regions  conducted more investigations than  Region  III.
                                           Ill
                                  27

-------
                                    FY  1976 MflNRGEriENT  SUMMRRY  REPORT
                     2C  PESTICIDES - CONT EFFECTIVE REGIONAL FOCUS ON INDUSTRY COflPL W/REG REQ
                                 NO. OF PRODUCER .ESTRBLISHIIENTS INSPECTED
             STRRT LEVEL.
O PLRNNED UNITS    0
X flCTURL UNITS     0
•I. OCTURL/COMMIT    0
372
535
23
831
1145
 50
1278
1002
 79
1718
2264
 99
2290
2685
 117
                                 NO. OF PRODUCER ESTPIBLI5HMENTS  INSPECTED
             STflRT LEVEL
O PLRNNED UNITS
X RCTUflL UNITS
7. RCTURL/COMHIT
REMRRKSs
0
0
0

42
38
19

84
88
44

126
136
69

168
170
86

198
203
103

        Region III  exceeded  its commitment with  an achievement level of  1031;  5
        more  inspections  than  it had planned.  The level of  performance  resulted
        in  31 civil actions  and 10  stop  sale orders.
                                              Ill  -  28

-------
              ID
              UJ
               FY 1976 MRNflGEdENT SUMMflRY REPORT
1  SOLID HflSTE - DEV « II1PLEM COMPLEH  5T 5 KED STRRT TO UPGRRDE SI
         NO. STflTE STRflTEGltS FOR CONTROL OF DISPOSRL SITES
                                                                               SW PRCIGE
             STRRT LEVEL
0 PLONNED UNITS    0
X FICTUflL UNITS     0
7. RCTUflL/COMMIT    0
                      11
         11
41
25
53
45
37
32
                                                                                  -   0
45
43
96
              OT
              UJ
                              NO- STflTE STRRTL'CIfS FOR CONTROL OF DISPOSRL SITE'S
             STflRT LEVEL.
O PLRNNED UNITS    0
X RCTURL UNITS     0
7. RCTURL/COMMIT    0
    REMRRKS:
                              0
                              0
                              0
                       1
                       1
                      25
 3
 Z
50
 4
 Z
50
 4
 Z
50
    *Region III  fell  2 short of  its commitment, with an achievement  level of
     50%.
    *A  change request lowering  this  commitment  was submitted late in March.   This
     request  was  received too  late  to be  acted  upon.
                                            Ill  -  29

-------
                                         f-'Y  1976  MHNRGEMENT  SUMMRRY  REPORT
                         1  RRDIflTlON  -  SUPPORT  THE  DEVELOPMENT  OF  STR1E  EMERGENCY  RESPONSE  PIRNS
                                     NO. OF EMERGENCY RESPONSE PLHNS COMPLETED

-------
REGION IV

-------
        END-OF-YEAR  REPORT-- REGIONAL OVERVIEW

                                     REGION IV

     During FY-76,  92 output commitments were monitored through the Formal  Reporting
System.  Region IV and the  States  in the Region met or exceeded 29 commitments,  nearly
met 15 more, and did not  meet  44.   In addition, no commitments were made  for  4 outputs

     Region IV obligated  over  $616  million of its municipal construction  funds
against a commitment of $611 million, making it the only Region to exceed its goal
for FY-76.   For FY-77,  the  Region  has $630 million in unobligated P.L.  92-500 funds.
The total number of awards  for Region IV was 527; this fell short of planned  levels.
Over one half of the awards were Step -Is, which upset the planned mix for Steps  1,
2, and 3 awards (planned  mix 31%-45%-24%; actual mix 62%-18%-20%).   Region  IV filed
14 final EISs with CEQ on construction grant actions.

     The Region increased its  total State program delegations to 19,  an increase of
2.  The 2 delegations for FY-76 were the NPDES program to North Carolina  and  the
change order review to Georgia.

     Eighty-nine percent  of the major nonmunicipal NPDES permittees in  the  Region
were in compliance with the schedule requirements of their permits at the end of
FY-76.  This is slightly  above the  national level of 87%.  The Region and the States
conducted a total of 5,885  reconnaissance and sampling inspections,  almost  40% of the
national total and about  5  times the number of major nonmunicipal permittees  in  the
Region.  These efforts resulted in  131 NPDES enforcement actions against  major and
minor nonmunicipal permittees  (17%  of the national total).   The Region  had  planned
issuance of 164 enforcement actions.

     Overall compliance of  major municipal permittees with the compliance schedule
requirements of their permits  was reported to be 96% in Region IV.   This  was  the
highest municipal compliance level  reported by any Region.   The Region  and  the States
conducted a total of 5,724  reconnaissance and sampling inspections of major municipal
permittees, far above planned  levels.  These activities resulted in 46  enforcement
actions against major and minor municipal permittees.
                                      IV - i

-------
     Region IV has 42 major federal facility permits issued.  Fourteen percent were
found to be in violation of their permit compliance schedules.  The national average
for violations in major federal compliance schedules is 17.6%.

     During FY-76, Region IV completed 1,474 O&M inspections, by far the largest
for any Region and amounting to nearly one third of the Agency's output of 4,566.
Region IV awarded water supply grants totaling to $1.31 million to all 8 of its
States; all 8 States are expected to assume primacy.  Region IV completed 7,774
SPCC plan and implementation inspections, also the largest output for any Region.
This total comprised nearly 59% of the Agency's total of 13,289 inspections and
exceeded the Region's FY-76 commitment of 7,566.  Region IV evaluated 25 State
water pollution laboratories,  which again was the largest number for any Region.

     In the air media, Region IV did not meet its FY-76 commitment for bringing
sources into final compliance.  However, the Region had 91% of its known sources in
final compliance and in compliance with schedules at the end of FY-76.  This repre-
sents a 1% increase in compliance level from the end of FY-75.  The Region exceeded
its commitment for field surveillance actions but did not accomplish its commitment
for enforcement actions taken to ensure point source compliance.

     Region IV did not meet its commitment for delegation of the NSPS and NESHAPS
programs.  However, Georgia and Alabama were granted delegation of both of these
programs during FY-76.

     Also, Region IV has more federal point sources (118) than any other Region.
Fifty-three percent of its federal point sources are either in compliance with SIPs
or on a consent declaration.   Twenty-two percent of these sources are of unknown
status.

     Region IV conducted a total of 881 producer establishment, and use and reentry
investigations,  the largest number for any Region.   Five out of the Region's 8
States have Section 4 Certification Plans approved.

     A total of 12 State strategies were submitted from Region IV for control of
disposal sites (6) and hazardous waste disposal (6).  These strategies will be
                                       IV  -  ii

-------
reviewed in FY-77 for consistency with and conformance to the FY-76 Resource
Conservation Recovery Act.  Region IV has developed and implemented 2 federal
facility strategies for compliance with Sections 209 and 211 of the Solid Waste
Disposal Act.
                                      IV - iii

-------
             IO
             a
             Of.
             a:
               5000
       F'Y  1976 MRNflGEMF.NT  SUI1MRRY REPORT
1   HflTtR - HUNICIPRL  FRCIIITIL'S PROGRfltl tlfiNHGEMENT
      NUMBER OF CONSTRUCTION GRRNT flHRRDS
              GTRRT  LEVEL.
x ncTuni  UNITS
0   1SZ  303  635  905  1170  1616 1872 2346 2669 3004 3322 3977
                                                       4649
                                      NUMBER Of CONGTRUCTION GRDNT RWRRDG
                                     | NOV| DEC| JRN| FEB| MRR| RPR|
                                     J!*    i-i   ^    i    /j»   J_v    /t
              FTRRT LEVEL
X RCrUHL  UNITS
    REMflRKS:
    108  133   193  211  275   307  319  335   447
                                                                     527
     This  Region fell short of  its  original plans for FY-76  due to major slippages  in Step 2
     awards,  despite a significant  overage in Step 1 awards.   This imbalance in awards upset
     the planned mix of awards  and  may cause major obligation slippages in the future:
     31%-45*:24% planned versus 62%(325)-18*(95)-20%(107)  actual for Step 1, 2, and 3 awards,
     respectively.   The FY-77 plans may correct this slippage with a planned award  mix of
     211-551-24%, which emphasizes  the need to concentrate on Step 2 awards.
                                               IV  -  1

-------
                7500
                                         FY 1976 HRNRGE.NENT  SUMMRRY  RKPOR1
                                  1   WRTER - MUNICIPRL FRCH.1TIEG PROGRRM MRNRGEI1ENT
                                 DOLLRR VHLUE OF CONGTRUCTION ORRNT  RWRRDG  (MILLIONS)
               STPRT LEVEL.
O PLRNNED UNITS
X RCTURL UNITS
'I. RCTIJRL/COI1MIT
0             1003            1653    •        2261            -1643
0   21.9  514  730  893  11S7  1652  1790  1999 2259  2413 2789 4141
0    4    9    13    16   20   29   31    35   39   42   49   72
                                                                                              -  0
5733
4809
 84
                                 OOLLRR VRLUE OF CONSTRUCTION GRONT DWORDS  (MILLIONS)
               STRRT LEVEL.
O PL
X RC
'/. RC
1HNED UNITS 0
TURL UNITS 0
TURL/COMMIT 0
REHRRKS:
no
40 68 84
7 11 14
248 322 535
90 121 Z48 253 281 313 317 333 535
15 20 41 41 46 51 52 55 38
611
616
101
This is the only Region which exceeded its commitment for the past
obligating $616 million. This leaves an unobligated balance of $630
which is only sightly above the amount obligated during the past 5
The Region obligated near the lowest percentage of funds to Step 3
88%, while the national average was 92%.
year by
million,
quarters.
awards ,
                                                    IV  -  2

-------
                       Water 2 - State Program Delegations

                                    National
Approved NPDES Programs
Final Plans § Specs Review
Bid Tabulation Review
Change Orders Review
0§M Manual Review
Interim Inspections
Start 7/1/75

     24
     27
      2
     26
     33
      0
Commitment

    33
    41
    14
    38
    40
     7
Actual 9/.30/76

      28
      37
       7
      37
      38
       2
Approved NPDES Programs
Final Plans § Specs Review
Bid Tabulation Review
Change Orders Review
OfJM Manual Review
Interim Inspections
      Region IV

Start 7/1/75

      3
      5
      0
      4
      5
      .0
Commitment

     4
     6
     3
     6
     6
     1
Actual 9/30/76

       4
       5
       0
       5
       5
       0
REMARKS:

NPDES - Georgia, Mississippi, and the Carolinas now have.
Plans § Specs - All have except Alabama, Mississippi, and Kentucky Ohich was planned)
Bid Tab - Georgia and the Carolinas were planned.
Change Orders - All have except Alabama, Mississippi, and Kentucky (which was planned)
0§M Manual - All have except Alabama, Mississippi, and Kentucky (which was planned).
Interim Inspecs - North Carolina was planned.
                                       IV  - 3

-------
               loo
           ct z:
           •z. cf-
           O lu cn
           •-J a. 60
           11 ^
           •z o
                                    FY 1976  MflNRGEMENT CHJMMRRY REPORT
                          39 WflTER NPDF..S PERMIT ISSURNCE  RNO COMPL IHNCE--NON-MUNICIPRL
                          V. OF' MRJOR  NON-MUNI  PERMITTEES IN  COMPLIRNCE WITH SCHEDULES
               20 -
             STRRT LEVEL
O PLRNNED UNITS    C
X RCTURL UNITS     0
77
77
  79
  82
       02
       86
               84
               87
               35
               87
             UJ
             CJ
                          '/.  OF MOJOR NON-MUNI PERMITTEES IN  COMPL IONCE WITH SCHEDULES
                           SEP OCT
      NOV
DEC  JRN
FEB
MRR  RPR
                                 MRY
JUN  JUL
RUG
SEP
             STRRT LEVEL
O PLRNNED UNITS    0
X RCTURL UNITS     0
78
95
  31
  •30
       84
       90
               87
               93
               07
               S3
    REMRRKS:
      This  graph  indicates  the percentage  of major nonmunicipal permittees reported
      to  be meeting the compliance  schedule requirements of  their  permits.  Region
      IV  reported that  89%  were in  compliance  at the  end of  FY-76,  slightly ahead
      of  the national  level  of 87%.
                                               IV - 4

-------
                          FT  1976  MflNRGEMENT  SIMMRRY  REPORT
               3R MflTER  NPOE5 PERMIT  ISSUANCE  RND  COMPLIRNCE-NONMUNICIPRL
               RECON INGPECG OF HRJOR fNON-HUNI) PERMITTEES BY EPR «, STRTL'S
STRRT LEVEL.
O PLRNNED UNITS    0
X RCTURL UNITS     0
7. RCTURL/COHI11T    0
              iu

              1 7500
                  3145
                  1788
                   13
6174
3607
 25
9304
7082
 50
12391
9137
  65
14153
11301
  30
               RECON INGPECG OF' MRJOR (NON-HUNII PERMITTEES OY EPR f. STRTEG
                                                                                 )100
GTRRT LEVEL
CD PLRNNED UNITG 0 1714 3357 . 5045 6699 7198
X RCTURL UNITS 0 849 1163 3048 3943 4675
'/. RCTURL/COMMIT 0 12 . 16 42 55 65
REMRRKS :





Tliis graph reflects nonmunicipal reconnaissance inspections performed by Region IV and by the
8 States in the Region. Region IV met
320 inspections. Most of the shortfall
by the State of Florida. There were 4
such ratio of any Region.
681 of its commitment to 474 inspections by performing
from planned levels was due to gross overcommitment
inspections performed per major permittee, the highest

                                     IV -  5

-------
             .g 5000
                                       FY  197S MFINflGEMENT  SUMMflRY REPORT
                            3fl uriTE'R   NPDES PERMIT ISSURNCE FIND COHPL IflNCE-NONMUNIC IPflL
                            GRNPLING 1NGPECS OF  MflJfNON-MUNI)  PERMITTEES BV EPfl «< STDTf.S
              STRRT  LEVEL.
0 PLRNNED  UNITS    o
X nCTUflL UNITS     0
'/. qCTUflL/COMMIT    0
91-1
629
 13
1850
 30
2121
2-150
 SZ
3626
3263
 69
4715
4357
 92
                            SflMPLING INGPECS OF  MFlJf NON-MUNI J  PERMITTEES BY EPO f. GTRTEG
              STF1RT  LEVEL
o PLRNNED  UNITS    o
X RCTURL UNITS     0
X flCTURL/COMMIT    0
    REMRRKS :
352
119
 7
710
Z33
 17
1077
539
 35
M72
378
 52
16D2
1210
 72
    I This graph reflects nonmunicipal sampling inspections performed by Region  IV staff and by the
     States in the Region.   Region IV performed *94 inspections,  6 less than its  commitment.  The
     States in the Region performed 1,116  inspections, 476 less  than their total  commitment of
     1,592.  Most of the State shortfall is  attributable to North Carolina, which missed its commit-
     ment by 470 inspections.
                                   AL    FLGAKYMS    NC     SCTN
                     COMMITMENT - 110   428   18   45   90   622    225   54~
                     ACTUAL      - 115   381   46   55  100   152    213   54
    * This number was reported incorrectly; the correct number  is  119 inspections.	
                                                 IV -  6

-------
                                          FY  1976 imNFlGEMENT SUMMITRY REPORT
                              3fl WRTER NPDES PERMIT  ISGUHNCE  OND  caMPLifiNCE--NON-iiiiNiciPflL
                                     NO.  OP' EPf) NON-MUNICIPfll. ENFORCEMENT  RCTION5
                      JUL   RUG  SEP  OCT
               STflRT IEVEL
O PLflNNED UNITS     0
X HCTUflL UNITS      0
7, flCTURL/COMMIT     0
291
121
 44
565
27-1
 21
067
450
 35
1166
623
1296
764
 59
                 250
                                     NO.  OF EPf) NON-MUNICIPRL ENFORCEMENT  FICTIONS
               STflRT LEVEL.
O PLflNNED UNITS 0 33 72 12-1 153 168
X RCTURL UNITS 0 30 63 93 1H 131
7. flCTUflL/COMMIT 0 18 38 55 S3 78
REMflRKS:



Region IV referred 33 nonmunicipal cases to Justice, nearly achieving its
commitment of 34. While short of its commitment of 122, the 97 Administra-
tive Orders issued was the second highest among the Regions.
                                                    IV  -  7

-------
                                   FY 1976  MflNriGEIIENT SUMITm REPORT
                          WRTER 3(3 NPHES PERMIT ISSURNCE HND COI1PLIfiNCE--MUNIClPni_
                         '/. OF MflJOR MUNICIPflL PERMITTEES IN COMPLIRNCE WITH  SCHEDULES
             STflRT LEVEL
O PLRNNED UNITS   0
X RCTURL UNITS    0
59
71
65
64
S9
79
73
'JO
32
             UJ
             O
                            OF MflJOR MUNI PERMITTEES IN COMPLIDNCE WITH SCHEDULES
             STRRT LEVEL.
O PLANNED UNITS
X RCTURL UNITS


    REMflRKS :
60
89
60
S5
74
33
80
93
80
96
     This graph indicates  the percentage  of major  municipal permittees  reported  to
     be meeting the  compliance schedule requirements of  their permits.   Region  IV
     reported that  96% were  in compliance at the  end of  FY-76.   This was the
     highest  level  reported  by any  Region and was  well above the national level  of
     82%.
                                              IV - 8

-------
                                          F Y 1976 N fl N H G E H E NT 5UMM!lR Y  REP0RT
                                3D WnTL'R  NPDES PERMIT  ISSUI-INCC. HMD  CUHPL IRNCf-MUN 1C IPfll
                                RECON  INSPF.CS  OP  MflJORfMUNM PERM I TILLS BY EPf) S.  STRTES
                                                                                                       I-
               STRRT LEVEL
0 PLflNNED UNITS     0
X RCTUflL UNITS      0
7, PICTURE/COMMIT     0
1902
2Z74
 18
3690
605B
 47
5463
0998
 71
7290
12529
  90
12752
15371
 124
                                RECON  1NGPECC  OF  MflJOR(HUNI) PERMlTTffS BY EPO «. STflTES
               STflRT LEVEL
O PL
X flC
7. OC
RNNED UNITS 0 443
TURL UNITS . 0 713
TUfiL/COHMIT 0 23
REI1RRKS:
730
1134
37
1126
Zb'SS
03
1500
3494
113
Tliis graph reflects municipal reconnaissance inspections performed by Region
the States in the Region. Region IV performed 166 inspections, exceeding its
89. The States performed 4,121 inspections, exceeding their total commitment
total of 4,287 inspections is more than 3 times the number of major municipal
the Region.
AL FL GA KY MS NC SC TN
COMMITMENT - 100 WO 240 1216 166 182 314 172
ACTUAL 5 725 433 1943 206 55 601 153
3079
4287
139
TV staff and
•commitment
; of '2, 990, '
permittees
by
of
'Hie .
Ln
                                                      IV  -  9

-------
             3 5000
                                      FY 1976 MflNnGEMENT SUMMHRY REPORT
                             30 WRIER NPOES PERMIT ISGUflNCE flND COMPLIflNCE-MUN 1C IPflL
                            GRI1PLING INSPECS OF MflJfJR(MUNI) PERMITTEES BY EPfl  4 S
              STHRT  LEVEL.
O PLANNED  UNITS    0
X FICTUflL UNITS     0
7. flCTUflL/COMMIT    0
022
594
 15
1575
18S4
 49
2108
2106
 55
3051
2760
395:;
3923
 102
                            SAMPLING INGPECG OF MflJORtMUNU  PERMITTEES BY EPfl  f.  GTPTES
              STflRT  LEVEL
O PLflNNED UNITS
X RCTURL UNITS
'/. flCTUflL/COMMIT
0
0
0
171
133
14
330
251
26
466
433
52
629
335
87
055
1437
150
    ! This graph reflects the number of municipal sampling inspections performed by Region IV staff
    ' and by the States  in the Regions.  Region IV performed  29  inspections, 361 of its  commitment
     to *80 inspections.  The States, however, performed 1,408  inspections, more than 40% of the
     national total,  and far exceeding their total commitment of 875.
                                         AL    FL   GA- "  KY   MS    NC    SC   TO
                            COMMITMENT - 4~0"   271   16   79"   IS   lW   169   7B~
                            ACTUAL     - 43   395   32   89   68   185   296  300
     *This commitment was reported incorrectly; the correct  commitment should have been 24
     inspections.
     .  	__.  _,,_ _ 	v	.	.	.	i	 - - — -.-.-.. _-L	-

                                                  IV - 10

-------
                                   FY 1976 MflNRGEMENT GUMHF1KY REPORT
                          3D WRTER  NPDES PERMIT
                            NO. OS.M  INSPECG OF I1RJOR MUNI PERMITTEtS-EPfl 4 STRTE
             STfiRT LEVEL
O PLRNNED UNITS   0
X RCTURL UNITS    0
'/. flCTURL/COMMIT   0
1007
 17
1923
1406
 33
"791
2277
 53
3751
3601
 05
4260
4566
 107
                            NO- 0*M INSPECG OF MflJOR MUNI PERMITTEES-fPH A STflTE
             STflRT LEVEL.
O PLRNNED UNITS   0
X RCTURL UNITS    0
'I. RCTURL/COMMIT   0
    REMPRKS :	
522
169
 8
972
442
 22
1396
9bl
 47
1836
1450
 71
2029
1474
 73
      Region IV  completed 1,474  inspections, by  far the  largest  number  for any
      Region, and accounted for  nearly  one third of the  Agency's total  of 4,566.
      Despite this large  output,  it was  555 short of achieving  its annual commit
      ment of 2,029.   The shortfall was  reportedly due  to travel funds  restric-
      tions both in the States and in the Region.
                                             IV  - 11

-------
                                          FT  1976 MRNRGr.MENT SUMHflRY REPORT
                                3D  MRTE'R NFDES PERMIT ISSURNCE RNU COMPLIRNCE--I1UN 1C If-'RL
                                      NO.  OF  EPR M.UNIC1PRL ENFORCEMENT RCTION5
               STRRT LEVEL.
O ^LflNNED UNITS     0
X RCTURL UNITS      0
•/. RCTUflL/COMMIT     0
H4
129
 18
290
222
 30
439
348
 40
617
510
 70
732
604
 83
                 100
                                      NO.  OF  EPR  MUNIC1PF)L ENFORCEMENT RCTIONS
                                                                                                1)100
               STRRT LEVEL
O PL
X RC
•/. RC
RNNED UNITS 0 22 45 66 90 98
TURL UNITS 0 14 23 28 30 46
TURL/COMI1IT 0 14 23 29 39 47
RENflRKS :

Region IV met only about half of its commitment for Municipal Administrative
Orders, having planned 89 and issuing 42. Its commitment to 2 Municipal
Referrals to Justice was exactly met. Two NOVs" were issued to the 4
delegated States in the Region, less than the commitment of 7.
                                                     IV  -  12

-------
                                    TV 1376  MHNRGEnEHT SUMMRKY  RETORT
                        3C WRTER  NPDES  PERMIT ISSURNCE RND COMPL1ONCE  - F'EUERRL  FflCH.ITIES
                              NCI. FED FflC  OPERS EJXRMINED FOR COMPL W/PERMIT PROV
             STflRT  LEVEL.
O PLF1NNED UNITS    0
X RCTUflL UNITS     0
7. ncTURL/conniT    o
91
107
23
                                       174
                                       206
                                       44
249
202
 60
349
396
82
469
510
109
                              NO. FED FflC  OPERS EXRMINEU FOR  COMPL W/PERH1T PRfJV
             STRRT LEVEL.
O PLRNNED UNITS
X RCTURL UNITS
'/. RCTURL/COHMIT
REMRRKSi
0
0
0

5
7
23

10
15
50

20
15
50

30
15
50

30
30
100

Region IV achieved  its
facility  permittees  to
  commitment.   It
  be  in violation
                                                   found 6 out of  its  42 major federal
                                                   of  their  compliance  schedules.
                                               IV - 13

-------
                                   TY 1976 MRNRGEMENT SUMMflRY REPORT
                   4fl  WRTER  PREP OF EISS «, NEG DECLflRRTIONS FOR EPR'S HWT PLT CONSTRUCTION ORTG
                             NO. F1NRL EISS FILED W/CF.Q ON CONSTRUCTION ORRNTS
o PLRNNED UNITS
X nCTURL UNITS
•/. nciuflL/conniT
_i t-J 200

z u-
2° 150
a: *"
* = 100
ir.
0
«
STRRT


-


I 1
f JUL RUG SEp|oCT NOV DEC^ JRN FEB MflR|nPR M
LEVEL.
TS 55 62 71 89
FS 55 52 63 66
11T 53 60 61 64




^ 	 Q 	 	 	 ^
1
1Y JUN j JUL RUG SEP^

£
i-i
|
.a.
- 75"
50s"'
0
103 103
73 86
71 83
                             NO. MNF1L EIGS Ml ED  W/CEQ ON CONSTRUCTION GRflNTS
CO
[O
2 "J 20
Uu
2 0
2^15
^ UJ .
UJ 00 l
-|10
5
0
^
	 /1\ 	 — - ' " ~ \-S ~ *sl. " ~~ 1 '""" ^
, 	 O 	 	 K «t „ 	 	 }
11 1 1
OCT NOV DEc| JRN FEB MRR^ RPR (1HY JUN| JUL RUG SEP
ci>
•z.
llOOffi
75 1
50"
.V
25
0
                                                                                       "ZZ.
                                                                                       IU
             STflRT LEVEL
O PLRNNED UNITS
X DCTUflL UNITS
7. ncTUflL/connn
REMRRKS5
12
12
80

13
12
80

14
12
80

IS
12
SO

15
12
80

is
14
93

      Region IV  filed  14  final  EISs with CEQ.   This  is 93%  of the Region's
      commitment.   Region IV  and Region VI  are tied  for  the highest number of
      final  EISs  filed.   Also,  Region  IV has  14 draft EISs  filed  with  CEQ.
                                             IV  -  14

-------
                             Water 5 - Water Supply

                                    National

1.   Number of Water Supply Program grants awarded.                        53

2.   Amount of FY-76 program grants awarded.                               $7.5 million

3.   Number of Water Supply Program grants refused (Pennsylvania,
     Indiana, and American Samoa).                                          3

4.   Amount of FY-76 program grants reallocated.                           $482,300

5.   Number of States and territories expressed intention to assume
     primary enforcement responsibilities.                                 54

6.   Number of States and territories expressed intention not to assume
     primary enforcement responsibilities (Pennsylvania and Indiana).        2

7.   Number of States and territories assumed primary enforcement
     responsibilities as of September 30, 1976.                             0

                                    Region IV

1.   Number of Water Supply Program grants awarded.                         8

2.   Amount of FY-76 program grants aivarded, including reallocated
     funds'.                                                                $1,309,900

          a.  Alabama   $131,275     e.  Mississippi     $131,500
          b.  Florida   $213,900     f.  North Carolina  $287,100
          c.  Georgia   $186,425     g.  South Carolina  $131,100
          d.  Kentucky  $108,100     h.  Tennessee       $120,500

3.   Number of States expressed intention to assume primary enforcement
     responsibilities.                                                      8

4.   Number of States assumed primary enforcement responsibilities as  of
     September 30, 1976.                                                    0
                                      IV - 15

-------
                      Water 6 - Section 208--Water Quality Management Planning

                                              National

                         Region:    I     II     III     IV     V      VI    VII     VIII    IX     X     Total

1.  Number of areawide
    designations approved
    and funded                     18     14      12     32     32     13      5     22     17    11     176

2.  Amount of funds
    obligated ($M)                $ 13.24  24.25   17.86  23.00  39.59   9.65  5.79  12.55  14.61   6.56   167.10

3.  Number of areawide
    work plans completed
    and approved                   15     11      12     26     25      95     21     10    10     144

                                              Region IV

1.  Number of areawide designations approved and funded --32

          a.   Alabama     3                       e.  Mississippi      1
          b.   Florida    12                       f.  North Carolina   2
          c.   Georgia     3                       g.  South Carolina   5
          d.   Kentucky    1                       h.  Tennessee        5

2.  Amount of funds obligated ($M) -- $23.00M

          a.   Alabama    2.99                     e.  Mississippi      0.23
          b.   Florida    9.96                     f.  North Carolina   1.69
          c.   Georgia    1.35                     g.  South Carolina   4.21
          d.   Kentucky   0.84                     h.  Tennessee        1.73

3.  Number of areawide work plans completed and approved --26
                                               IV -  16

-------
                                  FY 1976 IIDNRGLHENT SUMMnRY REPORT
                                7 WRTER  SPJIL PREVENTION HMD CONTROL
                               NO. SPCC PLHN COHPL/1MPL  It
             >TnRT LEVEL.
o PLRNNEU  UNITG   5922
X RCTURL UNITS   5922
"'. RCTURL/COriMIT    50
8301
9753
 83
3762
12283
 101
11818
13289
 112
                               NO. GPCC PLRN COHPL/1MPL  INSPECG
            STRRT LEVEL
O PLHNNED UNITS  5930
X nCTUHL UNITG   5930
7. RCTURL/COMMIT   65
    REMRRKC;
6730
6900
 91
7530
7527
 99
7566
8021
 103
     Region  IV has one  of the most conscientious oil  spill programs  in the  Agency.
     It has  consistently occupied  first place  in making  the largest  number  of
     SPCC plan  and  implementation inspections.   As of Sept. 30,  1976, the  Region
     completed 8021!'  inspections  against a commitment  of  7566; the FY-76 start level
     was 3S930 inspections.   During FY-76 including the transitional  quarter,  Region
     IV completed  2091 SPCC inspections, constituting nearly 39%  of  the Agency's
     total.
                                         IV -17

-------
               lOOr
                                   FY 1976 tlflNflGEMENT SUHI1RRY REPORT
                              HRTER  STRTE MONITORING PROGRRMS t  GURLITY PISSURRNCE
                                  NO. OF STflTE LflBORRTORIES EVRLURTED

             STflRT LEVEL
O PLRNMED UNITS    0
X RCTUflL UNITS     0
'/. RCTURL/COnniT    0
20
11
15
62
72
97
84
114
                                   NO- OF STOTE LRBORRTORIES
                   JUL  RUG  SEP OCT  NOV  DEC JHN
             STRRT LEVEL
O PLRNNED UNITS
X RCTUflL UNITS
•/. RCTURL/COMMIT
REMRRKS;
0
0
0

8
1
6

16
?.?.
122

.18
25
139

        Region IV  was committed  to evaluate  18 laboratories, and exceeded  that
        commitment by evaluating 25.   No serious  quality  assurance deficiencies
        were  noted by the  Region.
                                          IV -  18

-------
C F1IR
             50000
                                  f'Y  1976 MHNPIGr.MENT SUMI1RRY REPORT
                                - RSGURE COM PL If-INCE WITH FUEL RDIJ (1 I VE REGULRTIONG
                               NO GRS COUPLES  TEGTED DY r IF..I.D/LHB HE HICK!
            GTRRT LEVEL.
$ PLflNNED UNITG    0
X RCTURL UNITG    0
•/. RCTUflL/conniT    o
  5350
  7492
1161 7
12802
 •12
18017
18723
 62
25000
27900
 32
30250
34350
 116
                               NO GPS SOMPLES TESTED BY FIELD/LOB METHOD
            5TRRT LEVEL
(!) FLRNNED UNITG
X OCTUm. UNITG
'/. RCTURL/COriMIT
    REIIflRKS ••
  ISO
  732
  20
1500
1275
 34
Z250
1134
3000
3123
 83
3750
                          109
     Region  IV exceeded  its FY-76  commitment for gas'samples  tested to  ensure
     compliance with  fuel additive regulations.  The  Region reported that it did
     not issue any notices of contamination* as compared to the national  level of
     0.6% of  samples  tested.  The  Region  did report  that this  program resulted in
     the detection of  746 general  a.vailibility, nozzle,  and other violations of
     the fuel  additive regulations.
     ^Region  IV did 4  notices of contamination, but  reported  them under "number of
     penalties assessed";  this represented  0.1? of samples tested.
                                            IV  -  19

-------
                                      FY 1976 nnNflGEMENT GUMMRRY REPORT
                     3fl RIR   -  ENGURE CONTINUED COI1PL1RNCE WITH SIP REQUIREMENTG IN ERCH SIRTK
£ 25000
CJ
ct:
o 20000
o 1500IJ
a:
m 10000
z:
* 5000
0
T
NU • lUt.NI fl OUUKLtO
:___^^=^=

-
11
OCT NOV DEc| JRN
IN 1-




FEB
1NHL LUnr





RPR
H / 1 n 1

— 	 •



nRY
'Ob Ktliti

— »-


1
JUN| JUL

• ••




RUG

__<
-

-
-
CEP
MOOz
75^
n.
50 iu
o
0
              STflRT LEVEL.
O PLflNNED UNITS  13920          14531
X RCTURL UNITS   13920          H839
7. HCTUni/COMMIT   70            75
             15418
             16984
               05
             15959
             18060
               91
             16976
             17924
               90
             19031
             18367
               92
                                NO.  IDENT PT SOURCES  IN F1NflL  COUP W/EMISS  REGS
UJ OUUU
(C
2 o 3000
0 -v,
"-1 LU
<* m 2000
ZI
2 1000
0
j 	 — 	 	 ^ 	 If 	 M 	 	 3

11 1 1
OCT NOV DECJ_JRN FEB MRR^ RPR MRY JUN| JUL RUG SEP
              STRRT LEVEL.
O PLRNNED UNITS  3795
X RCTURL UNITS   3795
'/. RCTURL/COMMIT   86
    REHRRK5:      	
3987
3757
 85
4144
3863
 38
4171
3365
 OS
4362
3665
 83
4412
3890
 03
      Region  IV did not accomplish its FY-76 commitment.  The Region has  indicated that reported
      data  is 3 to  5 months old due to timing of input into the compliance  data system (CDS).
      Unverified States'  reports indicate a slightly higher accomplishment  level than does the
      FRS report.   Based on the FRS report, of its 4,571 known point sources,  851 are in final
      compliance and an additional 51 are in compliance with schedules.   This  combined 90%
      compliance level compares to an overall national level of 92%.   The  Program  Reporting
      Division  is currently studying the delayed  input  problem.
                                                IV -  20

-------
            iTl
            llj
_j o 2000
a: 
-------
                                      FY 1976 MflNRGEMENT  SUMMRRY REPORT
                      3fl RIR   - ENSURE CONTINUED COHPLIflNCE WITH SIP REQUIREMENTS  IN EflCH STflTE
                                    RNTICIPfVri'D  NO  ENF RCTS BY EPfl
O PLRNNEU UNITS
X RCTURL UNITS
7. RCTURL/COMMIT
3TRRT LEVEL
    0
    0
    0
192
226
21
435
3G
642
532
 49
043
790
 72
1094
1091
 100
                                    RNTICIPflTE'O NO  ENF F1CTS BY  EPO
                    JUL  RUG  SLT  OCT
              GTflRT LEVEL.
O PLRNNED UNITS    0
X RCTURL UNITS     0
7. RCTURL/COMMIT    0
    REMRRKS:    	
                 81
              208
               71
               10
              278
              116
              29
              335
              Z37
              59
              405
              326
              80
     Region  IV did not meet its FY-76 commitment  for air enforcement action.*  The  Region should
     have reported 336 enforcement actions instead of 326.   This number of air enforcement actions
     is higher than any other Region.  The 336 actions consisted of 307 Notices of  Violation, 27
     Abatement Orders, and the initiation of  2 civil/criminal proceedings.  The States  in the
     Region  also undertook a substantial number of enforcement actions.  The number of  State actions
     is not  documented here since each State  uses a slightly different definition of  what consti-
     tutes an  enforcement action
     *This commitment was recorded incorrectly; the correct commitment was 327 enforcement actions.
                                                IV  -  22

-------
Air 3B
Number of States

          Delegated

            NSPS
           NESHAPS
                          Air 6 - Delegation of NSPS and NESHAPS

                                    National
Start Level

     2
     2
                       Commitment

                           41
                           33
                                                       Actual 9/30/76

                                                             23
                                                             17
Number of States

          Delegated

            NSPS
           NESHAPS
                                    Region IV
Start Level

     0
     0
                       Commitment

                            8
                            7
                                                       Actual 9/30/76

                                                              2
                                                              2
REMARKS:
The Region missed its FY-76 commitments for delegation of NSPS and NESHAPS
enforcement authorities.  Only the States of Georgia and Alabama have been
granted enforcement authority for these 2 programs.  Draft delegation requests
have been received and are at various stages of review from Kentucky, Mississippi,
North Carolina, and Tennessee. South Carolina was delegated both:>programs on
October 19, 1976.
                                     IV -. 23

-------
RIR
        FT  1376 MflNRGEMENT SUI1HRRY REPORT
- ENSURE COMPL'lRNCE OF FEDERRL  FRCI11TIE.S  WITH SIP REQUIREMENTS


NfiTIQNfiL
USER IN COMPLIRNCE
ro co .e. en
o o o a
o a o a
i lorf
0
^
£.
STHRT
NO. FED PT. SOURCES IN COHPLIRNCE WITH SIPS
-
. 	 »— 	
__=M£_:==LI^^
11
OCT NOV DEc| JRN FEE hflR^
LEVEL
tl
RPR HflY JLIN JUL RUG SEP
\T \

ct>
2 i-
nool ^>
5"
: 75 a. p
50 " S
>.*
25
0
O PLRNNED UNITS 118 151 171 221 269 326
X RCTUflL UNITS 118 139 161 145 249 246
•I. RCTURL/COMMIT 36 43 49 44 76 75


UJ
CJ
3 100
S^ 80
o
2z 60
cU «
•" —
^ S 40
CO
1 20C
0
1
£.
STflRT
NO. FED PT. SOURCES IN COHPL
-

11
OCT NOV DEc|jRN FEB HRR
LEVEL
O PLRNNED UNITS 24 24 24 2
IflNCE WITH SIPS


rj ^^ ^
Ci
RPR HRT JUN| JUL RUB SEP

nooz ^
:?5ps
50 iu ^
25"
0
1 24 80
X RCTUflL UNITS 24 23 23 19 63 62
7. RC

TURL/COMMIT 30 29 29 23 79 78
REMRRKS:
Region IV has 118" federal point sources; the highest number for any Region.
Region IV has 53% of its federal point sources either in compliance witli
SIPs or on a consent declaration.
*This number was reported incorrectly; the
correct number is 116 sources.
                         IV  -  24

-------
      FY  1976  MHNHOEHENT  SIJMMHRY REPORT
ENGURE COMPLiriNCE Or FEDERflL FflCHITlES WITH  SIP  REQUIREMENTS
cO
uj 250
CJ
_j o 200
<£ LO
2 o 150
H-
cn &•
z In 10(T
z:
21 50
0
X
4.
STRRT
NU . rtu ri. tiUUKUtti uu i ui- Luni-LiHNLt HIIH 'olio


1 I 1 1
JUL HUG GETj_ OCT NOV DEC.| JflN FEB nf)RJ_ RPR MHY JUNJ_ JUL HUG GEP^
LEVEL
>
O PLflNNEO UNITG 101 112 118 . 120 121 111
X HCTURL UNITG 101 125 123 74 DO 82
£ o 40
2 o 30
uj n^ •
TZ
0
1
L.
STflRT
MO, FED PT . SOURCES OUT OF COMPLIflNCF; WITH G1PS
.
_^_ qs L r 	 ___ m 	 	 	 fl\ — M, — — '-- 	 *
— - — " L' 	 - — — — -^^^x^ ^/^ '-
1 1 1 1
JUL RUG SEP OCT NOV DEC JHN FEB MHR RPR NHY JUN JUL RUG GEP
C r r t '
LEVEL


O PLflNNED UNITG 24 30 34 34 34 36
X nCTUnL UNITS 24 24 29 ]1 31 30
REMflRKS J
Region IV has 25% of its federal point sources out of compliance with SIP
One of the 30 sources out of compliance is on a consent delcaration.
Twenty-two percent of Region IV's federal sources are of unknown status.
                IV  -   25

-------
                                   FT 1976 MflNRGEHENT  SUMrtflRY REPORT
                        1 PESTICIDES -  LSTHBLISH OPERflTIONflL STRTE. CERT IF-I CRT I ON  PROGRRMS
                                  NO, STRTF. SECT.  4 CERT  PLRNS RPPROVED
             STRRT LEVEL.
O PLRNNED UNITG    3
X RCTURL UNITS     3
'I. RCTUHL/COMMIT    6
30
10
19
43
15
29
52
25
48
52
30
                                  NO. STRTt SECT. 4 CERT PLRNS RPPROVEO
             STRRT LEVEL
O PLRNNED UNITS
X RCTURL UNITS
'I. RCTURL/COMMIT
REMflRKS:
1
1
13

2
Z
25

3
4
50

6
5
63

8
5
63

8
5
63

       Region  IV set  a  commitment of 8 State plans,  by  far the  largest  number
       of all  Regions,  and fell just 3 short for  an  achievement level of 63%.
       Only 1  Region  had more  State  plans  approved than Region  IV.
                                              IV - 26

-------
           2
           O
             2500
                  F'Y 1976 MflNRGEHENT GUMI'TIRY REPORT
       2R PESTICIDES - ENSURE PROPER USE FIND RPPLICRT10N OF PESTICIDES
             NO- USE RND RE-ENTRY IN VEST I GflT IONS CONDUCTED
            STRRT LEVEL
o PLRNNED UNITS
X RCTUHL UNITS
'/. flCTUflL/COriMJT
0
0
            CO
            z
            o
195
325
28
344
472
41
499
592
60
731
1162
100
1159
1399
 121
                             NO. USE OND RE-ENTRY INVESTIGATIONS CONDUCTED
            GTORT LEVEL.
O PLRNNED UNITS
X RCTURL UNITS
'f. RCTURL/COMM1T
REHRRKS-
0
0
0

40
32
30

80
95
35

120
130
47
220
379
130
275
415
151
       Region  IV exceeded  its commitment with  an achievement level  of 151%.   The
       serious  involvement of this  Region in this program is apparent by the  415
       use and  reentry  investigations conducted.   This was  the greatest number  of
       investigations by  any Region;  Region X  was second  with 220.   NOTE:  Region
       IV incorrectly reported the  total number of investigations-299 instead of
       415.  However, Region IV still lias the  largest number of  investigations
       conducted.
                                          IV  -  27

-------
              5000
                                    FY 1976 MRNRGEMENT SUMMnRY REPORT
                     2C PESTICIDES - CONT EFFECTIVE REGIONRL FOCUS ON INDUSTRY COMF1. W/REG REQ
                                 NO. OF PRODUCER ESTRBLISHMENTG INSPECTED
             STRRT LEVEL
O PLRNNED UNITS    0
X RCTURL UNITS     0
'/. RCTURL/COMMIT    0
372
535
23
831
IMS
 50.
1278
1802
 79
1718
2264
 99
2290
2685
 117
               500
                                 NO.  OF PRODUCER ESTRBLISHMENTS INSPECTED
             STF1RT LEVEL
O PLflNNED UNITS
X RCTUflL UNITS
7. RCTURL/COMMIT
REMRRKSs
0
0
0
50
103
26
120
204
52
190
360
92
260
380
97
390
466
119
       Region IV  exceeded its  commitment  with  76 more inspections  than  it had
       planned  for an  achievement  level of 119%.  These inspections resulted  in
       37  civil actions  and  44 stop sale  orders.
                                            IV -  28

-------
             UJ
             5 50
               FY  1976 MflNnGEMFNT  SUMMflRY  REPORT
1  SOLID WRSTE - DEV S IMPLEM COMPLEM ST t FED STRflT TO UPGRflfJE ST 5W
         NO. STRTt: STRRTEGIES FOR CONTROL OF DISPOSAL SITES
             STflRT LEVEL.
O PLflNNED UNITS    0
X RCTUflL UNITS     0
7. RCTURL/COMMIT    o
         1 I
14
I 1
24
41
26
53
                                                45
                                                37
                                                82
45
43
96
             UJ
                             NO. STflTE STRATEGIES FOR CONTROL  OF DISPOSOL SITES
             STRRT LEVEL
O PLANNED UNITS
X RCTUFIL UNITS
•/. flCTUflL/COhHIT
REMflRKS:
0
0
0

0
a
0

0
0
0

6
5
83

6
6
100

6
6
100

     Region IV  obtained its  commitment with 100%  achievement  level.   No other
     Region had a larger number of  State  strategies for control of  disposal
     sites than Region IV;  2 other  Regions had  the same number.
                                              IV - 29

-------
                FY 1976 MfiNRGEMENT SUMMRRY REPORT
1  RRD1RTION -  GUPPORT  THE  DEVELOPMENT  OF  STflTE EMERGENCY RESPONSE PLRNS
            NO.  OF EMERGENCY  RESPONSE  PLPNS  COMPLETED













CO DU
o:
.jaUo
a:
r!!30
CC UJ
z|20

•jr.
10l

T


-

-

____ _
	 — '
. ,_ — • — ~ "" 	 	 	 •
5—= 	

JUL RUG SEP OCT NOV 0
STflRT LEVEL
o PLRNNED UNITS i i
X RCTURL UNITS 11
7. RCTURL/COHI1IT 32



	 . 	 -« 	 <

	 	 	 ~~~~
	 6 """ ^ 	 :
	 -w: 	 ^ 	 '
	 X 	 	 	 	 	
'
. .
EC | JRN FEE? I1RR RPR MRY JUN J_ JUL RUG SLP

,
•z. ,
•— « i~
of =
"75 n.. £
\ u. ^
50 « «-]

25



21 35 34
13 16 21
38 47 52
NO. OF EMERGENCY RESPONSE PLRNG COMPLETED










i n
UJ 1 U
a:
^J" ~^ Q
f-y Q- O
li_
2 ° 6
UJ UJ
01 r 4
^
2
nr
Uv

-
-

-


JUL RUG SEP OCT NOV 0
STRRT LEVEL
O PLRNNED UNITS 0
X RCTURL UNITS 0
7. RCTURL/COMMIT 0





REMRRKS;





	 © 	 	 (
	 	 	
I'lC )
JRN FEB MRR RPR MRY JUN 1 JUL RUG SEP

5 t-
^|
a. ^
HOOii- =
75"S
r ri
^ U

2 44
0 00
0 00

Region IV had a commitment of 4 but was unable to have any acceptable
plans .approved. The Region did complete 4 Emergency Response Plans during
FY-76; however, Nuclear Regulatory Commission's approval of these plans is
pending.

                          IV  -  30

-------
REGION V

-------
        END-OF-YEAR  REPORT-- REGIONAL OVERVIEW

                                      REGION V

     During FY-76,  92 outpvit  commitments were monitored through the Formal Reporting
System.  Region V and the States  in  the Region met or exceeded 46 commitments,  nearly
met 13 more, and did not meet 32.  In  addition, no commitments were made for  11 outputs.

     As of September 30, 1976,  Region  V obligated approximately $1 billion of its
municipal construction funds  against its FY-76 commitment of $1.34 billion.   The
Region's 75% achievement is slightly less than the Agencywide average of 84%.
However, Region V issued more awards during the year than any other Region, which
totaled 1,019.   Despite this  excellent record, this number still fell short of  its
planned goal.   With over two  thirds  of the total being Step 1 awards, the planned
mix of 58%-21%-21% was not achieved  with a final mix of 71%-13%-16% for Steps 1,
2, and 3 awards, respectively.  For  FY-77, Region V has $1.8 billion in unobligated
P.L. 92-500 funds,  of which over  $600  million is for Minnesota alone.

     Region V increased its total State program delegations to 19.  Although  this
was an increase of 9, it was  5 shy of  its planned increase of 14.  Illinois,  Michigan,
Ohio, and Wisconsin assumed responsibility for final plans and specifications review;
Wisconsin for bid tabulation  review; Illinois, Ohio, and Wisconsin for change orders
review; and Minnesota for O&M manual review.

     Region V reported that 82% of the major nonmunicipal NPDES permittees were in
compliance with the compliance schedule requirements of their permits at the  end of
FY-76.  This was slightly below the  national level of 87%; the lower Regional
percentage figure is attributed to more accurate tracking by Michigan and Minnesota.
The Region and the States conducted  1,398 reconnaissance and sampling inspections,
well below their total commitment of 2,017.  The total is about twice the number
of major nonmunicipal permittees  in  the Region.  These efforts resulted in 72
NPDES enforcement actions against major and minor nonmunicipal permittees, slightly
below the total commitment of 78.

     Overall compliance of major  municipal permittees with the compliance schedule
requirements of their permits was  reported to be 80%,  slightly below the national
                                       V - i

-------
level of 82%; as stated above, the lower figure is due to more accurate tracking by
Michigan and Minnesota.  The Region and the States performed 1,483 reconnaissance
and sampling inspections, falling below planned levels for the year.  Low State
performance on sampling inspections caused the shortfall; however, the total number
of inspections is still 2.6 times the number of major municipal permittees in the
Region.  These activities resulted in 100 NPDES enforcement actions against major
and minor municipal permittees, well above planned levels, and the second highest
of any Region.

     Region V issued 2 major federal facilities permits.  Both are in compliance
with their schedules.  The Region filed 7 final EISs with CEQ on Step 3 grants
during FY-76..

     Region V completed 404 O&M inspections,  exceeding its FY-76 commitment of 402.
The Region awarded water supply grants to all of its States except Indiana, which
refused a grant of $134,300 and expressed its intention not to assume primary
enforcement responsibility.  The remaining grants totaled $1.09 million, with the
largest ones made to Ohio ($280,500), Michigan ($275,500), and Illinois ($253,300).
All of the States receiving grants intend to assume primary enforcement responsibi-
lities.  Region V has approved 32 Section 208 areawide agencies, equaling that of
Region IV.  These 2 Regions, with a combined total of 64, have nearly 37% of the
Agency's total of 176 areawide agencies.  The grant amounts totaled $39.59 million,
with the largest amounts to agencies in Michigan ($11.07 million), Ohio ($9.70
million), and Illinois ($9.65 million).  Twenty-five of the 32 agencies have completed
their project work plans.  The remaining 7 were awarded grants only recently and
are well on their way to completing their .work plans.  The Region completed 922 SPCC
plan and implementation inspections,  more than double its annual commitment of 400.
Region V evaluated all 6 of its State water pollution laboratory networks,
fulfilling its commitment of 6.

     For the air media compliance outputs in FY-76, the Region nearly met its
commitment for bringing sources into final compliance.  In addition, the Region
had 91% of its known sources in final compliance and in compliance with schedules
at the end of FY-76 as compared to an 80% compliance level at the end of FY-75.
The Region exceeded its commitments for field surveillance and enforcement actions
taken to ensure point source compliance.  Emphasis was placed on enforcement in


                                       V -  ii

-------
Air Quality Control Regions (AQCR) which were not achieving ambient air quality
standards with 72% of enforcement actions taken in these AQCRs.   Region V did not
meet its commitments for delegations of NSPS and NESHAPS enforcement authorities.
However, the Region did grant delegation of both these authorities to Indiana and
Michigan, as well as granting the NSPS authority to Ohio.

     Fifty-seven percent of its 23 federal point sources are either in compliance
with SIPs or on a consent declaration.  Thirty percent of its federal point sources
are of unknown status.

     Region V's pesticide program performed in an outstanding manner on producer
establishments inspected with an achievement level of 159%.  Not only was this the
highest percent accomplished, but its commitment was larger than any other Region.
Most of the other pesticides programs appear to be operating satisfactorily,  with
the exception of the State Section 4 Certification Plans; under  Section 4, only 2
States have been approved.

     Region V met its solid waste commitment for number of State strategies for
control of disposal sites and number of State strategies for hazardous waste
disposal.  This Region  did not reach its commitment for number of federal facilities
strategies developed.

     As of September 30, 1976, Region V reported no approval of  any drafted plans
to support the development of State Radiation Emergency Response Plans.  However,
the Region reported the receipt of 6 completed plans.  These are pending approval by
the Nuclear Regulatory  Commission (NRC).
                                      V -  iii

-------
             CO
             D
                    F'I 1975 MflNOGEMENT SUNMflRY  REPORT
              1  HRTER -  MUNICIPAL FflCII.ITILS  FROGRflM MflNflGEME'JT
                   NUMBER OF CONSTRUCTION GROUT flHflROS
                    JUL| RUG| SEP| OCT| NOV| DEC| JRN| FEB| nflR
                                                          JUL
                                                      nuo
                                                      SEP
              STflRT  LEVEL.
X nCTURL  UNITS
0   15Z  303  635  905  1178  1616 1072 2345  2669 3004 3322  3977
                                                            4649
             cO
             a
                                      NUMBER OF CONGTRUCTION ORDNT FlI-lflROG
              GTRRT LEVEL
X RCTURL  UNITS
    42
39
157   205  254  337   401  542  590  664  752  866
J019
    REMRRKS ••
     The Region fell short of  its  original FY-76 plans  due to slippages for all  types of awards.
     Albeit  this Region made more  than twice the awards of any other Region except Region VII;
     it did  not achieve its planned mix of awards:   58%-21I-21% planned versus 711(718)-131(136)-
     16%(165)  actual for Step  1, 2,  and 3 awards, respectively.  The FY-77 plans may tend to
     correct this slippage with a  planned award mix  of  23%-46%-31%, which shifts the emphasis to
     Step  2  and Step 3 awards.

-------
                                    FY 1076  MRNRGEMENT SUMMflRY REPORT
                             1  NflTL'R - MUNICIPAL  FP1CIIITIES PROC-RRII MRNRGE.MENT
                            COI. LnF?  VflLUE OF  CONSTRUCTION GRHNT F1WRRDG (MILLIONS)
             STRRT LEVEL.
o PLRNNEO UNITS    o
x RCTLIRL UNITS     o   219
'I. RCTURL/COMMIT    04
        1003          1653   .       2261          -1643
        733 893 1157 165;. 1790  1999 2259 2413 2789 4141
        .13   16  20   29   31'  35   39   42  49   72
                            DOLLHR  VRLUE OF CONGTRUCTION GRRNT RURRUG fMILLIONS)
                                                        5739
                                                        4309
                                                         84
             STflRT LEVEL
O FLflNNED UNITS    0
X RCTURL UNITS     0
7. ncTURL/connu    o
    REMRRKS:
30
    ZU7          341          443
119  173  S09  293- 341  359  425  444  451
 9    13   16  22   25  27  32   33   34
    105S
523  759
39   57
1340
1000
 75
      The Region obligated  $1000  million in  FY-76 but still fell  short  of its
      planned  commitment  for the  past  year.   This leaves  an unobligated balance
      of nearly $1.8  billion, an  amount  over  80% in  excess  of the funds obligated
      during the past 5 quarters.   Minnesota  has an  unobligated balance in  excess
      of $.6 billion.
                                               V -  2

-------
                       Water 2 - State Program Delegations

                                    National

                              Start 7/1/75        Commitment       Actual 9/30/76

Approved NPDES Programs            24                 33                 28
Final Plans § Specs Review         27                 41                 37
Bid Tabulation Review               2                 14                  7
Change Orders Review               26                 38                 37
0§M Manual Review                  33                 40                 38
Interim Inspections                 072


                                    Region V

                              Start 7/1/75        Commitment       Actual 9/30/76

Approved NPDES Programs             565
Final Plans § Specs Review          054
Bid Tabulation Review               021
Change Orders Review                0                  5                  3
0§M Manual Review                   566
Interim Inspections                 000
REMARKS:

NPDES - Illinois does not have.
Plans § Specs - Indiana and Minnesota (planned) do not have.
Bid Tab - Only Wisconsin now has.
Change Orders - Wisconsin, Ohio, and Illinois now have.
                                      V - 3

-------
                                  FY 1976 MRNRGEMENT SUMMRRY REPORT
                        3fl WRTER NPDES PERMIT ISSURNCE RND COHPLIRNCE--NON-HUN1C1PRL
                         •f. OF MflJOR NON-MUNI PERMITTEES IN COMPLIflNCE HITH SCHEDULES
            STflRT LEVEL.
CD PLONNED UNITS    0
X RCTURL UNITS    0
77
77
79
82
02
86
84
07
                                           85
                                           87
                         •'. OF tinjoR NON-MUNI PERMITTEES  IN COMPLIRNCE WITH SCHEDULES
                                                     X
                              OCT
NOV
1
               JflN
FEB
i
              RPR
MflY
I
              JUL
flUG
          SEP
            STRRT LEVEL.
O PLflNNED UNITS    0
X RCTURL UNITS     0
85
83
54
89
04
39
03
87
                                           03
                                           8Z
    REMflRKE
     This graph indicates  the percentage of  major nonmunicipal  permittees  reported
     to be meeting the  compliance  schedule requirements  of their  permits.   Region
     V reported that 82% were in compliance  at the end  of PY-76,  slightly  below
     the national level of 87%.  Only 2 States, Michigan with  55% and Minnesota
     with 68%,  were particularly low; their  shortfall  occurred in the transition
     quarter  when revised  tracking systems produced  lower results in Michigan and
     Minnesota.
                                             V - 4

-------
                                          FT  1976  I1RNRGEMENT SUIHIflRY REPORT
                              3fl MRTt'R  NFDE5 PERMIT  ISSURNCE  RND COMPLIRNCE-NONMUNICIPRL
                              RECON INSPECS OF MFIJOR (NON-MUNI) PERMITTEES  BY  EPR  «  STRTES
               STRRT LEVEL
© PLRNNED UNITS     0
X RCTUHL UNITS      0
'', RCTUflL/COMMIT     0
3145
1780
 13
5174
3607
 25
930-1
7082
 50
12391
9137
141SS
11301
  00
                              RECON INSI'ECS OF MRJOR (NON-MUNI) PERMITTEES BY  EPf)  *.  STRTES
               STRRT LEVEL
O PL
X HC
'/. RC
qNNED UNITS 0 359 720 J033 M44 1494
TUflL UNITS 0 302 S76 S70 755 929
rURL/COMdlT 0 20 39 33 51 62
REMRRKS :
This graph reflects nonmunicipal reconnaissance inspections performed by Region V staff and
by the States in the Region. The Region performed 89 inspections, 70% of its commitment to
128 inspections. The States in Region V performed 840 inspections, 61% of their commitment
to 1,366 inspections.
                                                    V  -  5

-------
              in
              o
                                         FY 1976 MONnGr.HF.NT SUMMRRY  REPORT
                              3R WRTER  MPDES PERMIT ISSURNCE flND  CDHPL IflNCE-NONMUNIC
                              SRI1PLINO INSPECS OF  MRJf NON-MUN1 )  PERMITTEES BY EPR f,  STRTt'S
                                                                                               -0100
               STRRT LEVEL
O PLHNNED UNITS    0
X RCTURL UNITS     0
7. flCTURL/COMMIT    0
9M
629
 13
1850
1404
 30
2727
2-150
 52
3526
3263
 69
4716
4357
 92
                 750
                              SAMPLING  INSPECS OF MRJ(NON-MUNI) PERMITTEES PY EPR t, STflTES
               STRRT LEVEL
O PL
X RC
X RC
RNNED UNITS
TURL UNITS
TURL/COHMIT
REMRRKS ;
0 95 184 270 357 523
0 92 176 306 367 469
0 18 34 59 70 90
This graph reflects nonmunicipal sampling inspections performed by Region V staff and by the
States in the Region. Region V conducted 124 inspections, exceeding its commitment by 24
inspections. All of the States in the Region except Ohio missed their commitments . In total,
the States committed to 423 inspections and performed 345.
IL IN Ml MN Oil WI
COMMITMENT - ~9~ 88 155 15" 77 58"
ACTUAL - 6 49 156 4 92 38
                                                     V  -  6

-------
             2500
                                  FT  1976 linNRGEHENT SUtUlRRY REPORT
                        3R WRTtR NPDES PERMIT ISSUANCE flNO COMPLIF)NCE--NON-f1UNICI POL
                              NO. OF EPfi NON-MUNICIPHL ENFORCEMENT RCTIONS
            STRRT LEVEL.
0 PLRNNED UNITS    0
X RCTUflL UNITS    0
X flCTURL/COMMIT    0
291
121
44
565
274
21
967
450
35
1166
623
 48
1295
764
 59
                              NO- OF EPfl NON-MUNICIPOL ENFORCEMENT OCTIONS
            STflRT LEVEL.
O PLHNNED UNITS
X flCTUnL UNITS
'/. HCTUflL/COMMIT
REKflRKS J
0
0
0

35
9
12

49
22
28

40
35
45

44
59
76

78
72
92

      Region  V issued  the second highest  number of  nonmunicipal Enforcement
      Actions of the Regions.   The commitment for  20 Referrals to Justice was
      exceeded by 1, and the commitment for 46 Administrative Orders  was missed
      by only 3 Orders.   Eight  NOVs were  issued as  compared  to a commitment  of
      12.  Region V  also took 422 non-Nl'DES Enforcement Actions, second highest
      among the Regions.
                                             V  -  7

-------
                                  FT 1076 MBNHGEMENT SUMMRRY REPORT
                          NRTER 3B NPDES PERMIT ISSUANCE HND COIIPLinNCE —MUNICIFPL
                         V. OF MflJOR MUNICIPflL PERMITTEES  IN COMPLIflNCE  WITH SCHEDULES
            STflRT LEVEL.
O PLRNNED UNITS   0
X flCTUHL UNITS    0
59
71
65
64
69
79
  73
  84
                          •>. OF MflJOR MUNI PERMITTEES IN COMPLIflNCE WITH SCHEDULES
                                       DEC  JRN
                   FEE
          M9R  RPR
      MF)Y
JUN  JUL
RUG
SEP
            STRRT LEVEL
O PLRNNED UNITS   0
X RCTURL UNITS    0
83
77
02
79
83
35
  03
  BO
      07
      80
    REMflRKS:
     This graph indicates the  percentage of major municipal permittees  reported  to
     be meeting the compliance schedule  requirements of  their permits.   Region V
     reported  that 80%  were  in compliance at  the end of  FY-76,  slightly  below the
     national  level of  821.  Again,  revised  tracking systems  in the  transitional
     quarter reduced Michigan  and Minnesota percentages.

-------
            2 25000
            i • i
                                       FY  1076 I1RNRGEMENT GUtlMRRY REPORT
                             3E3 WRTER  NPDES  PERMIT ISSURNCE flND  COMPL IRNCE-MUNIC IPRL
                              RECON  INSPECS OF flRJORtMUNI) PERMITTEES PY  EPR f. STRTES
              STflRT  l.EVEl.
o PLRNNED  UNITS    o
X RCTURL UNITS     0
'/. nCTURL/COMMIT    0
1902
2274
 18
3590
605S
 47
5453
3903
 71
 7200
12529
 98
12752
15371
 12-1
                              RECON  INSPECS OP nnjOR(HUNI) PERMITTEES RY  EPfi  t, GTflTEG
              STRRT  LEVEL
0 PLRNNED UNITS
X RCTURL UNITS
'/. RCTURL/COMHIT
REMRRKG >
0
0
0

243
258
22

499
553
46

749
699
53

995
907
75

1203
1144
95

      This graph reflects  municipal reconnaissance inspections  performed by Region V staff and by
      the States in the  Region.   Region V performed 61 inspections, 9 less than  its doinmitnient.
      The States performed 1,083 inspections,  55 less than their total commitment.   No inspections
      were made by Wisconsin,  Minnesota made only 1, and Ohio only 3.
                                            IL     IN    MI    MN    Oil   WI
                              COMMITMENT  - 202    600   125    0    15   196
                              ACTUAL      - 353    615   111    130
                                                    V  -  9

-------
                                         FT 1376 tlflNflGEMENT  SUMMRRY  REPORT
              2 5000
              UJ
              c_
              z 4000
            S fe 3000
                               3B WflTER  NPDES
                              SRMPL1NG  INSI'ECS
             PERMIT  ISGUflNCE  RND  COMPL 1 RNCF.-tlUN ICIPDL
             OF nnjORfttUNI)  PERMITTE.ES  BT CTF1 « STflTES
                2000
                1000
                     JUL
DEC  JflN
                       FEB
               STORT LEVEL
O PLRNNED UNITS    0
X HCTUflL UNITS     0
''. flCTUflL/COMMIT    0
              1575
              1834
                 2130
                 2106
Ib
3051
2768
 72
3353
3323
 102
                              SRMPLING  INSPECT,  OP  MPUOREMUNI) PERMITTEES RY EPH 
-------
            2 5000
                                   FY 1976 HRNRGEHENT SUMtlPRY REPORT
                          3D WRTER  NPDES PERMIT ISSUANCE  RND COHPL IRNCE-IIUNICIPRt
                            NO. (KM INSPECS Of 1-tflJOR MUNI  PFRhlTTLtS-EPR «, STflTE
             STflRT LEVEL
CD PLRNNEU UNITS   0
X RCTURL UNITS    0
'/. RCTURL/COMMIT   0
1007
729
 17
1923
1406
 33
2791
2277
 53
3751
3S01
 05
4260
4556
 107
                            NO. 0*M INGPECS OF HflJOR MUNI PERMITTEfS-EPf) «, STOTE
             STRRT LEVEL
O PLflNNED UNITS
X RCTUflL UNITS
7. flCTURL/COHtllT
REMRRKS;
0
0
0

102
109
27

195
113
28

283
169
42

402
321
80

                                                                               402
                                                                               404
                                                                               100
       Region V  completed 83 inspections  during  the transitional quarter giving
       the Region a total of 404  for the  year,  2  more  than its  FY-76 commitment
       of 402.   The Region reported completing  113 of  these inspections  as of
      Dec.  31,  1975;  thus, 291  were done during
      output higher than most Regions.
                                            V -  11
                          the  last 9 months, a  rate of

-------
                 750
                                         FT 1976 URNRGEIIENT SUIIMflRY  REPORT
                               3D HRTER NPDES PERMIT  ISSURNCE  RND COMPLIRNCE--(1UNICIPHL
                                      NO. OF EPR MUNICIPRL ENFORCEIIENT  RCTIONS
               STRRT LEVEL.
O PLRNNED UNITS    0
X RCTURL UNITS     0
''. RCTURL/COMhIT    0
144
129
 13
230
222
 30
439
348
 40
617
510
 70
732
604
 03
                 100
                                      NO. OF EPF1 MUNICIPRL ENFORCEMENT  RCTION5
               STRRT LEVEL
O PLRNNED UNITS
X RCTUflL UNITS
''. RCTURL/COMMIT
REMflRKS)






The total
0
0
0
of 100
the Regions, and
for both
Municipal
13
14
18
Municipal
Region V

22
37
48
Enforcement
was 1
of only

23
55
73
Actions was
2 Regions
Municipal NOVs , and Administrative
NOVs
total, and also
although
more than
any
issued 71 AOs.
they committed to
1.
Region,
and
The Region


Orders

37
75
97
the second
to
•
about one
had no

exceed i
Region V
third of
Referrals


77
100
130
highest

among
ts commitment
issued
29
the national.
to Justi

ce,

                                                      V -  12

-------
             a 750
                                    F'Y 1976  l1flNRGf.MENT GUMMflKY  REPORT
                        3C HRTEK  NPDEG  PERMIT 1GGURNCE RNU COHFLinNCt  - FEDERflL  FHCILITIEG
                              NCI.  FED FRC  OPERG EXf)MINED TOR CDHPL W/PERMtT PROV
             STflRT  LEVEL
O PLflNNED UNITS    0
X RCTU'RL UNITS     0
'I. nCTUflL/COMMIT    0
91
107
23
J74
L'06
 44
249
282
 60
349
336
82
469
5JO
103
                              NO.  FED FflC OPERS EXRM1NED FOR COHPL W/PERMIT PROV
             STRRT  LEVEL
0 PLRNNED UNITS    o
X F1CTUF1I. UNITS     0
•I. HCTURL/COMNIT    0
    REMflRKS i
 9
15
44
 J9
 21
 62
 62
              34
 74
 34
 30
 8S
     Region  V achieved  88%  of its  commitment.   Region  V is  the only Region  that
     has not found any  major or  minor  federal  facility permittees  in  violation
     of their compliance schedules.
                                                V - 13

-------
                                     TY 1976 nFINRGEMENT SUMMflRY REPORT
                    4R WRTER  PREP OF EISS «• NEC DECLflRflTIONG FOR EPFTS WWT  FLT CONSTRUCTION U'?TS
                               NO- FINRL EISG TILED W/CEQ ON CONSTRUCTION GR9NTS
             STRRT LEVEL
O PLRNNEO UNITS   55
X RCTURL UNITS    55
7. FICTUflL/COIIMIT   53
                               S2
                               52
                               60
71
63
61
                     89
                     66
                     64
  103
  73
  71
       J03
       36
       33
                               NO-  FINFtL EIGG FILED W/CEQ ON  CONSTRUCTION GRflNTS
              CD
              10
            in uj ?n
            o  ^u
                10
                                                                        ©
                                             K
                                                          -e-
                                                           x -

                                 OCT
NOV
                                            H
                                               JON
       FEP
MRR  RPR
                           MflY
i
JUN  JUL
RUG
                                                                                    EP
                                            75°
                                            50 *'
                                            25
                                            0
             STRRT LEVEL
0 PLRNNED UNITS    2
X flCTURL UNITS     2
7. PICTURE/COMMIT   18
    REMRRKS i
 "o
45
                     3
                     5
                     45
  11
   6
  55
       11
       9
       02
      Region V filed 7  final  EISs with CEQ during  FY-76.   Only Region  X filed  a
      higher number in  FY-76.    Region V  filed  the  most  draft  EISs  with CEQ during
      FY-76  (11).
                                                 V  -  14

-------
                             Water 5 - Water Supply

                                    National

1.   Number of Water Supply Program grants awarded.                        53

2.   Amount of FY-76 program grants awarded.                               $7.5 million

3.   Number of Water Supply Program grants refused (Pennsylvania,
     Indiana, and American Samoa).                                          3

4.   Amount of FY-76 program grants reallocated.                            $482,300

5.   Number of States and territories expressed intention to assume
     primary enforcement responsibilities.                                 54

6.   Number of States and territories expressed intention not to assume
     primary enforcement responsibilities (Pennsylvania and Indiana).        2

7.   Number of States and territories assumed primary enforcement
     responsibilities as of September 30, 1976.                             0

                                    Region V

1.   Number of Water Supply Program grants awarded.                         5

2.   Amount of FY-76 program grants awarded, including reallocated
     funds.                                                                $1,090,000

          a.  Illinois  $253,300                      d.  Minnesota  $151,800
          b.  Indiana   (refused grant of $134,300)   e.  Ohio       $280,500
          c.  Michigan  $275,500                      f.  Wisconsin  $128,900

3.   Number of States expressed intention to assume primary enforcement
     responsibilities.  (Indiana refused grant and does not intend to  apply
     for primary enforcement responsibilities.)                             5

4.   Number of States assumed primary enforcement responsibilities as  of
     September 30, 1976.                                                    0


                                      V  - 15

-------
                      Water 6 - Section 208--Water Quality Management Planning

                                              National

                         Region:    I     II     III     IV     V      VI    VII    VIII   IX     X     Total

1.  Number of areawide
    designations approved
    and funded                     18     14      12     32     32     13     5     22     17    11     176

2.  Amount of funds
    obligated ($M)               $13.24  24.25   17.86  23.00  39.59   9.65  5.79  12.55  14.61  6.56  167.10

3.  Number of areawide
    work plans completed
    and approved                   15     11      12     26     25      95     21     10    10     144

                                              Region V

1;  Number of areawide designations approved and funded -- 32

          a.  Illinois     3
          b.  Indiana      5
          c.  Michigan    14
          d.  Minnesota    1
          e.  Ohio         6
          f.  Wisconsin    3

2.  Amount of funds obligated ($M)  -- $39.59M

          a.  Illinois     9.65
          b.  Indiana      4.29
          c.  Michigan    11.07
          d.  Minnesota    0.90
          e.  Ohio         9.70
          f.  Wisconsin    3.98

3.  Number of areawide work plans completed and approved -- 25
                                               V - 16

-------
                                          FY  197(5 imNHGEKENT SIJIIHflRY REPORT
                                        7  WRTt'R   SPTI..L  PREVENTION HNIJ CONTROL
                                      NO. GPCC PLRN COMPL/IHPL  INGPECG
               GTflRT LEVEL
O PLflNNED UNITS   5922
X flCTURL UNITS    5922
•i. ncTUflL/conniT    so
8301
9759
 03
9762
12283
 104
11318
13239
 112
                                      NO. GPCC PERN COMPL/IHPL  INSPEf.G
               5TRRT LEVEL
CD PLRNNED UNITS IB 47 9b 400
X RCTURL UNITS 16 221 693 922
•/. ncTURL/connn 4 57 175 231
REtlHRKS:







Region V has a very active spill program. Between July 1, 1975 and
September 30, 1976, the Region completed 906 SPCC plan and implement
inspections, ranking it second to top-ranked Region IV. This total,
carryover of 16 inspections from prior years, gives a year end total
which is more than double its FY-76 commitment of 400. Region V has
aerial photography to assist the field people in conducting effective
facility inspections.

at.ion
plus a
of 922
LI t i 1 i zed


                                                     V  -  17

-------
                                  FY 1976 llflNHGEIIENT GUMMP1RY REPORT
                                :  STHTF. MONITORING r-'RooRFiMSs ouniirr OSCURRIMCC:
                                 NO. OF STOTE LRBORflTORTtG EVHLUmED
            GTfiRT LEVEL
O PLRNNED UNITS    0
X flCTUnL UNITS     0
•'. flCTUflL/COMIlIT    0
20
] 1
62
72
97
7-1
84
111
                                 NO- OF GTflTt' LflBflRfHDRIES EVflLUflTED
            GTHRT LEVEL
O PLflNNED UNITS    0
X HCTURL UNITS     0
'/. RCTURL/COHMIT    0
    REMflRKG;
 0
 0
 s
83
 6
 6
100
      Region  V was committed to  evaluate 6  ^laboratories and evaluated 6.   Region V
      provides direct  technical  assistance  to the States.   Additionally,  Region V
      also  interfaces  with the Canadian government on  quality  assurance matters to
      help  assure uniformity, particularly  with regard to  the  Great Lakes.
      *Region V is reporting evaluation of  entire State laboratory networks rather
      than just  individual  laboratory inspections.
                                            V-  18

-------
FY 1976 MRNRGLHENT
















r- n nnn
to v?uuuu
\~
lO
_j i-u 40000
cc
2 ° 30000
f- K.
* c 20000

5
10000
Or
UI
T




_




-
^^gr-
i 	
JUL fl
GTRRT LEVEL
0 PLRNNEO UNITS 0
X nCTURL UNITS 0
'/. flCTURL/COIiniT 0











r'finn
tO DUU U
1-
g £ 4000
» ° 3000
0 £
^ £ 2000

^
1000
ni<
UD

-
-

-



JUL R
STRRT LEVEL
O PLRNNED UNITS 0
X RCTURL UNITS 0
'/. RCTURL/COI1HIT 0







REMRP-KS •
2C RIR
NO










^^ u
OCT

5050
7492
25
NO







^^sr^^^^^''
OCT

500
614
25

SUMMRRY REPORT
RSGURE COMPLIRNCE WITH FUEL RDD1TIVE REGULATIONS
GHG GRMPLEG TESTED BY F.IELD/LRB METHOD









-zz^-
— •*
NOV












^x^z^


JHN

11617
12802
42








~==^~i


FEP










______=i^^=

'


RPR

18017
18723
62






r^^




	
hHY








^^--— "~ " -

-— : JQ"




JUL R

25000
27900
92




——^^l

-

-


JO SEP
«


o
2 i-

$: uj
'I 00 5 >-
	 1 1
70 °' £
ll_ *-
(-1 t-~>
50 ' •-'
N"
25


30250
34950
116
GPS GflMPLEG TESTED BY F1EI.O/LRB METHOD







=^
NOV





Region V exceeded its FY-76








JflN

1000
1135
45






-—


FEB

.



commitment




	 X — ==
	 	 ^-&~
_ * ^^

RPR

1500
1 701
63





	 	 •-



MflT









«^«— 	


I
JUN| JUL R

2000
2013
SI




	 <


_
-
JG SEP
cb

(X ^
51005^ ^
75 £?,
CJ
50 s:



2500
2543
102

for gas samples tested to ensure
compliance with fuel additive regulations. The Region reported that notices
of contamination issued
represented 0.6% of the samples tested. This is
the same as the national average of 0.6%. In
addition to contamination
violations, the Region detected 560 general availability, nozzle, and other
violations of
the fuel regulations.
V   -   19

-------
                 F'Y  1976 HRNRGEHENT SUHMRRY REPORT
3fl RIR   - ENSURE CONTINUED COMPLIRNCE WITH SIP REQUIREMENTS IN ERCH STRTf.
            NO.  IDENT PT SOURCES  IN FINRL COMP  W/EMISS  REGS












UJ £DUUU
CJ
or
_j o 20000
CC (O
z
I— *
cc v-
z m 10000
2Z
z 5000
0
T


-


j- — 	 ^===r^=—

-

-

OCT N
STRRT LEVEL
o PLRNNED UNITS 13.920 14531
X RCTUflL UNITS 13920 14339
V RCTUHL/COMMIT 70 75





- 	 ' ~~ ®"





JRN F

15413
15934
85



%s
~"i. 	 	
~





RPR M

15959
10060
91




— — 8 — "






JUL R

16975
17924
90


	 _^
— •* >

-

.

-

UO SEP

t
) 1 0 0 2?
' t_t l~
v i s
75 P t

50u. =
o cl
25 '"'
0

19031
133G7
92
,n NO. IDENT PT SOURCES IN FINRL COMP W/EMISS REGS










, r-r- r»o
UJ r} U U U
CK
g o 4000
iO

1 o 3000
£ ^
«* a 2000
IT
2 loorf
0

-

-

^_.^--
j_ 	 •= — ^3
i
JUL RUG SEP | OCT N
STRRT .EVEL
O PLRNNED UNITS 1195 1324
X RCTUflL UNITS 1195 1432
''. RCTURL/COMMIT 35 42






REMRRKS;
Region V nearly met its FY
into final compliance. Of
in final compliance and an




. ^^. — — -
~±t — —


i
3V DEC. JRN F
*\

1407
2669
78





- — — "

-6 	


RPR M

1487
3298
.96




v


^^

i
3Y JUN| JUL R

1561
3401
99





-------
                                  FY  1976 !ir)NF)GEI1ENT SUnilRRY REPORT
                   3R RIR   -  ENSURE CONTINUED COtlPLIRNCE WITH SIP REOUI REMF.NTS IN EOCII STHTE
                         NO IDENT PT SRC OUT OF COM H/FNL EM1SS REQ  NOT ON SCU
            STRRT LEVEL
O PLRNNEO UNITS   1396
X RCTURL UNITS   1396
1109
1605
Oil
1606
559
1330
284
1406
                                                                             284
                                                                             1226
                         NO iUENT PT SRC OUT OF COM H/FNL F.MISS REQ  NOT ON GCD
            STfiRT LEVEL
O PLRNNED UNITS   299
X RCTURL UNITS   299
                            255
                            544
             205
             529
             164
             462
             121
             379
             1.21
             307
    REMRRKS;
       Region V  did not meet its  FY-76 commitment for  reducing  the number  of
       point sources in violation.   In addition to the 307 sources in violation of
       final SIP requirements, 44  sources are  in violation of applicable  compliance
       schedules.   The 351  sources  in violation account for 23%  of the  sources
       reported  in violation on a  national  basis.  These violating sources comprise
       8% of the sources  in the Region as compared to  a national violation level
       of 7%.

                                             V  -  21

-------
                                 FT 1976 Mf)NRDEt1ENT SUIlMflRY REPORT
                   3fl flIR  - E.NSURE CONTINUED COMPLIRNCE WITH SIP REQUIREMENTS IN ERCH STflTE
                               RNTICIPflTED NO ENF RCTS BY EPfl
            STRRT LEVEL.
O PLRNNED UNITS    0
X nCTUflL UNITS     0
X P1CTURL/COMMIT    0
132
226
21
435
395
36
64?.
532
40
843
790
72
1094
1091
100
                               DNT1CIPRTED NO ENF RCTS BY EPR
            STRRT LEVEL
CD PLRNNED UNITS
X RCTUflL UNITS
'/. RCTUfiL/COMMIT
    REMRRKSs
 18
 37
 37
36
55
55
66
65
65
100
•34
94
100
128
1Z8
      Region V exceeded its  FY-76 commitment for air enforcement actions.   The
      128 actions  consisted  of 87 Notices  of Violation, 38 Abatement Orders,  and
      the initiation of 3 civil/criminal proceedings.   With  128  actions,  Region V
      ranked third among the Regions  in  terms of total air enforcement actions
      taken during FY-76.  The States  in the Region  also undertook a substantial
      number of  enforcement  actions.   The  number of  State actions is not  documented
      here since each State  uses a slightly different  definition of what  constitutes
      an enforcement action.

                                         V  - 22

-------
Air 3B
Number of States

          Delegated

            NSPS
           NESHAPS
                          Air 6 - Delegation of NSPS and NESHAPS

                                    National
        Start Level

             2
             2
Commitment

    41
    33
Actual 9/30/76

      23
      17
Number of States

          Delegated

            NSPS
           NESHAPS
                                    Region V
        Start Level

             0
             0
Commitment

     6
     5
Actual 9/30/76

       3
       2
REMARKS:
Region V did not accomplish its FY-76 commitment for delegation of NSPS and NESHAPS
enforcement authorities.  The Region did, however, delegate both these authorities
to Indiana and Michigan, as well as delegating the NSPS enforcement authority to
Ohio.
                                     V - 23

-------
                           RIR
        FY  1976  MRNRGEMENT SUMMRRY REPORT
- ENSURE COMPLIONCE OF FEDERRL FRCILITIES WITH SIP REQUIREMENTS
CJ
ir 500
.j £ 400
a: o
z o
2 z 300
a:
£D
i loo5
0
^
NO- FED PT. SOURCES IN COHPLIRNCE HITH SIPS

11 1
CCT NOV DEc| JRN FEB MRR| RPR M
___,

JUL RUG GEP
: 75
25
0
                                                                                                    _J
                                                                                                    D..
                                                                                                      C)
                                                                                                      O
               STRRT LEVEL
© PLRNNED UNITS   118
X nCTURL UNITS    118
''. nCTURL/COtlMIT    36
It,]
133
171
161
49
221
MS
 44
269
249
 76
326
246
 75
                                     NO.  FED PT. SOURCES IN COMPL1RNCE WITH SIPS
               STflRT  LEVEL.
O PLRNNED UNITS 0
X HCTURL UNITS 0
'/. RCTURL/COMMIT 0
REMHRKS:



Region V has
SIPs or on a
is 72%.
89899
S H 1.3 3
89 156 11 33 33

571 of its 23 federal point sources either in compliance with
consent declaration. The Regional average for this statistic

                                                     V  -  24

-------
                                    F'Y 1976 MRNRGEMENT SUhMRRY REPORT
                               ENSURE COMPLIRNCE OF FEDERRL FRC1LITIES  WITH SIP REQUIREMENTS
                               NO- FED PT. SOURCES OUT OF COHPLIRNCE WITH SIPS
                                OCT
             STRRT LEVEL
 PLRNNED UNITS   101
X RCTURL UNITS    101
       NOV
DEC  JRN
       FEE
I RPR  MflY  JUN|
MflR  RPR
   JUL
RUG
112
125
113
123
  120
  74
121
90
SEP
      111
      sz
                              NO. TED PT. SOURCES OUT OF COMPLIflNCE WITH SIPS
             STRRT LEVEL
CD "LRNNED UNITS   25
X fiCTURL UNITS    25
25
25
25
19
  25
  13
25
13
       13
       13
    REMflRKS )
       Region  V met  its commitment.   Ten of  the 13  federal point sources out of
       compliance with SIPs are  on a  consent declaration.   Seven federal point
       sources are of unknown status;  this represents 30%  of these sources.
                                            V  -  25

-------
                                   fY  1976 MRNRGEMENT SUMMRRY REPORT
                       1 PESTICIDES  - ESTflBLISH OPERRTIONRL STRTE CERT IF'ICRT ION PROORRCIS
                                 NO. STRTE SECT. 4 CERT PLRNS RPPROVED
             STRRT LEVEL.
0 PLRNNED UNITS    3
X fiCTURL UNITS     3
't. RCTUHL/COMMIT    6
12
4
8
30
10
19
43
15
29
52
25
48
52
30
50
                                  NO. STRTE SECT. 4 CERT PLRN5 (APPROVED
                                                                                     cr>
             STRRT LEVEL.
O PLHNNED UNITS
X RCTUflL UNITS
•t. RCTURL/COMHIT
REHRRKS>
0
0
0

1
0
0

3
0
0

4
0
0

5
1
20

5
2
40

       Region V  fell  3  short  of its  commitment with an achievement level of  401
       However,  these  3 State plans  have been signed by  the governors  and are
       waiting approval.   Final approval is  anticipated  in early FY-77.
                                              V -  26

-------
               2500
                                      FY  1376 MflNflGEMENT SUMMRRY REPORT
                          2fl  PESTICIDES -  ENGURE PROPER UGE f)NU RPPLIdTTION OF PEGTICIDEG
                                 NO-  USE  RND RE-ENTRY  INVESTIGATING CONDUCTED
              GTRRT LEVEL
O r'LflNNED UNITS    0
X nCTUflL UNITS     0
'i. HCTUftL/COMMIT    0
19S
3C5
23
344
472
41
493
692
60
791
1162
100
1 It. 9
1339
121
                                 NO.  USE  FIND RE-ENTRY  INVESTIGATIONS CONDUCTED
                                                                                        100
                                                                                           Ci)
              STRRT LEVEL
O PLflNNED UNITS
X nCTURL UNITS
't. nCTUfll/COHMI.T
REMflRKSs
0
0
0

20
20
21

40
35
37

60
55
53

80
75
79

95
95
100

      Region V met its investigation commitment  in  obtaining  a 100%  achievement
      level.
                                              V  -  27

-------
                5000
                                         FY 1976 MUNflGEMENT SUMMflRY REPORT
                        2C  PESTICIDES - CONT EFFECTIVE REGIONflL FOCUS ON INDUSTRY COflPL W/RE& RED
                                      NO. OF PRODUCER EGTRBLISHMENTS INSPECTED
               STflRT LEVEL.
O PLF1NNED UNITS    0
X RCTUflL UNITS     0
''. flCTURL/COMMIT    0
372
535
 23
831
IMS
 50
1270
1002
 79
1718
2264
 99
2290
2685
 117
                 750
                                      NO-  OF PRODUCER ESTRBLISHMENTS INSPECTED
               STRRT  LEVEL.
(D PLPNNED UNITS 0 50 100 175 250 400
X RCTUflL UNITS 0 00 234 368 525 634
7. flCTUHL/COntllT 0 20 59 92 131 159
REtlflRKSi






Region V exceeded its commitment with an achievement level of 159%. T
Region had the largest commitment of any Region, and accomplished 168
inspections than the next closest Region. Furthermore, this Region




his
more








inspected over 231 of the total number of producer establishments inspections
by all Regions. These inspections resulted in 29 civil actions and 34
sale orders .
stop



                                                   V  -  28

-------
                CO
                LU
                  rr  1976  HRNRGEI1ENT  SUflMRRT  REPORT
1  SOLID HRSTE - DEV S IMPLEM COMPLEM ST & FED STRRT TO UPGRRDE ST SW PROGS
          NO. STRTE GTRRTEGIES FOR CONTROL OP DISPOSAL SITES
               STRRT LEVEL
© PLRNNED UNITS    0
X OCTURL UNITS     0
•i. RCTURL/COMMIT    0
           5
           5
           II
II
24
41
26
58
45
37
82
45
43
9S
                UJ
                                  NO.  STflTE 5TRRTEGIES FOR CONTROL OF OISP05RL SITES
               STRRT LEVEL
O PLRNNED UNITS 0 02 5 6 6
X RCTUflL UNITS 000356
7. RCTURL/COtiniT 0 0 0 50 83 100
REMRRKS"


Region V met its commitment with an achievement level of 100%. Only 1 Region
had a higher achievement level, and no Region had a larger commitment level.
                                                     V  -  29

-------
                FY 1976 MRNRGEMENT SUMMflRY REPORT
1  RRDIRTION - SUPPORT THE DEVELOPMENT OF STRTE EMERGENCY RESPONSE. PLF1NS
             NO.  OF  EMERGENCY  RESPONSE PLRNS  COMPLETED





,'
?.b
0
21 35 34
13 16 21
33 47 62
NO- OF EMERGENCY RESPONSE PLRNS COMPLETED

-
.

B 	
JUL RUG SEP OCT NOV D
LEVEL
O PLRNNED UNITS 0
X RCTURL UNITS 0
•f. RCTURL/COMMIT 0

REMRRKSi



AT> 	 	 	 /
llf >|f ^
T t
EC JRN FEB HRR RPR MRY JUN JUL RUG SEP
W TT 1


•z.

>IOOK. 2
75 £ ?)
LJ
50 >.-
25
C 0
4 55
0 00
0 00

Region V had a commitment of 5 but was unable to have any acceptable plans
completed.
                            V  -  30

-------
REGION VI

-------
        END-OF-YEAR  REPORT-- REGIONAL  OVERVIEW

                                     REGION VI
                                                            \
     During FY-76,  92 output  commitments were monitored through the Formal  Reporting
System.  Region VI  and the  States  in the Region met or exceeded 61 commitments,  nearly
met 6 more, and did not meet  18.   In addition,  no commitments were made  for 7 outputs.

     Region VI obligated nearly $302 million of its municipal construction  funds
against a commitment of $316  million; the percentage achievement (96%) was  next  to the
highest of all Regions and  exceeded the national average of 84%.  For FY-77, the
Region has $224 million in  unobligated P^L. 92-500 funds.   The  total awards (563) fell
short of initial plans with over half of the total being Step 1 awards.   This upset
the planned award mix of 33%-43%-24%, with a final mix of 55%-28%-17% for Steps  1, 2,
and 3 awards.   A total of 28  final and draft EISs was filed with CEQ for construction
grant projects.

     The Region made no additional State program delegations beyond the  15  at the
beginning of the year.   There was  expected to be 1 additional delegation (NPDES).

     Region VI reported that  71% of the major nonmunicipal permittees were  in
compliance with the compliance schedule requirements of their permits at the end of
FY-76.  This compliance level was  below the national level of 87%.   The  Region
and the States conducted 1,908 reconnaissance and sampling inspections of major
nonmunicipal permittees.  This was well above the total planned level and more
than 4 times the number of  major nonmunicipal permittees in the Region.   These
activities resulted in 167  NPDES enforcement actions against major and minor
nonmunicipal permittees.  This level exceeded the Region's commitment and was the
highest number of actions initiated by any Region, 21% of the national total.

     Overall compliance of  major municipal permittees with the  compliance schedule
requirements of their permits was  reported to be 53%.  This was the lowest  compliance
level reported by any Region;  the  national level was 82%.   The  Region and the States
conducted 626 reconnaissance  and sampling inspections,  exceeding their commitment and
slightly under twice the number of major municipal permittees in the Region.  These
efforts resulted in 33 NPDES  enforcement actions against major  and minor municipal
permittees.  This exceeded  the Region's commitments to 21 actions during FY-76.


                                      VI - i

-------
     All of the 65 major federal facility permits were issued during FY-7G.  Fifteen
percent were found to be in violation of their compliance schedules.

     Region VI awarded water supply grants to all of its 5 States, totaling $909,900
The States with the largest grants were Texas ($451,900), Louisiana ($137,000),
and Oklahoma ($132,800).  All of the Region's States intend to assume primary
enforcement responsibilities.

     Region VI has approved 13 areawide agencies for Section 208 grants, which
totaled $9.65 million.  Agencies in Texas and Oklahoma received $6.49 and $2.71
million, respectively.  No areawide agencies were designated in Louisiana and New
Mexico.  Nine project work plans have been approved out of the 13.  Region VI was
the only Region to have all of its phase I basin plans approved by the end of FY-76.
                                     •
     Region VI completed 987 SPCC plan and implementation inspections against Jts
commitment of 898.  The Region evaluated 6 State water pollution laboratories,
achieving its commitment of 6.

     As of September 30, 1976, Region VI completed 796 O&M inspections, second to
Region IV (1,474) in having the largest output for this program.  The Region
exceeded its annual commitment of 596 by 200.

     In the air media, the Region exceeded its FY-76 commitment for bringing
sources into final compliance.  The Region had 95% of its known sources in final
compliance and in compliance with schedules at the end of FY-76, as compared to a
70% compliance level at the end of FY-75.  The Region exceeded its commitments for
field surveillance actions, and with the high level of compliance, did not find it
necessary to meet its commitment for enforcement actions taken to ensure point
source compliance.  The Region did not meet its commitments for delegation of the
NSPS and NESHAPS programs.  No States in the Region were delegated, although some
progress towards delegation?was accomplished in Texas and Oklahoma.

     Region VI is 1 of 3 Regions that exceeded its commitment for number of federal
point sources in compliance with SIPs.  Eighty-three percent of its 41 federal point
sources are either in compliance with SIPs or on a consent declaration.
                                       VI  -  ii

-------
     The Region nearly achieved its commitment for pesticides State Section 4
Certification Plans; only the State of Louisana is waiting for approval.  This will
give Region VI a 100% achievement level.  This Region surpassed its commitment for
producer establishment inspections with an achievement level of 116%; Region VI's
achievement level ranked fourth among all Regions and in total inspections ranked
third.  In 2 areas, use and reentry investigations conducted, and experimental use
investigations, this Region fell behind with the lowest percent of commitment
achieved among all Regions.

     In FY-76, Region VI has an achievement level of 100% for all its solid waste
outputs.  This Region's solid waste program achievements express a great deal of
effort in this area.                    •>

     In the radiation program to support the development of State Emergency Response
Plans, Region VI met its commitment by obtaining an achievement level of 100%.
                                     VI  -  iii

-------
                                      FY 1976 MRNRGtMENT SUMMRRY REPORT
                                  HRTER - MUNICIPRL  FRCILITIES ^RODRRrl MRNRGEMENT
                                      NUMBER OF CONSTRUCTION  GRflNT RWRRDG
                         RUGJ GtPJ OCTJ NOVJ DECJ JBMJ FEDJ HKRJ RPR] HHYJ JUNJ JUL
X RCTUflL  UNITS
                      J52  393  535  305 1)78 1615  1372 2346 2661] 3001  3322 3977
4543
              to
              ra
                                      WUMBER OF CONSTRUCTION GRflNT RNRTOC
                    i.EVL'l
X RCTURL  UNITS


    P.EMfiRKS i
                      25   *3   S3    90   127  221  242  290   343  339  -'-20  b50
     The Region  fell short of its original FY-76 plans due  to slippages in Step  2  and Step 3
     awards.  Although the Region exceeded its planned goals  for Step 1 awards by  over 50%, the
     result was  an imbalance in their  originally planned mix  of awards:  331-435-24% planned
     versus 55%(312)-28$(156)-17$(95)  actual for Step 1, 2, and 3 awards, respectively.
                                                  VI  -  1

-------
                                         FY  1376  MRNRGEMENT  5UMMRRY  REPORT
                                          - MUNICIPRL FRCILITIES PROGRflM MRNRGEI1ENT
                                 DOLLflR  VOLUE  OF  CONSTRUCTION  GRPNT  RWRRDS  {MILLIONS!
f\











— ' IOVU
o
z:
_i 6000
~~'
^ >e---- 	 " 	 '
^^- ^T
^^—~^K
	 ii fff^ 	 *^
: ^ ^^==-^^^^~^^^
i - ~^=~ i | i i
JUL 1 RUG GLP|OCT NOV DEc| JM FED MnF?| RPR MRY JUN| JUL RUG GLP

.,
uoo5 i-
2 12
75 5 ^
0- y!
50 cu-3 ?5
c.;
25 S
0
STflRT LEVEL
pLfl'-INED UNITS 0 1033 1653 2261 4643 5730
fiCTURL UNITS 0 219 514 733 393 1157 1652 1790 1999 2259 2413 2789 4H1 4809
RCTURL/conniT o 4 3 13 IB zo 29 31 35 33 42 49 72 84















"I
^ COLLflf? VH1.-LJE 3F CONSTRUCTION DRRNT RWRP.DS f MILLIONS!
3 SCO
o
a:
0 & 40°
_ cr
& J 300
S °
UJ '"*
* -i 200
a;
t—
o
^ 100
nr
U.




,

j»- ^_=r~ ' — ~^
~yf^
*^r
~ ' . '^'^z^
^ — *
	 i y^"1™

.^.^tf 	 0 -r-.^f=—
JUL RUG SLD CfT NOV DLT.I JRN FEB H.9R [ RPR flHY JUN JUL RUG SLP
r ' *- 4-


ti>
2-
2: -^
^100 •£ 3=
_J *~
75 °- ^
ii. ^
50 ° "
>^.
25

STflRT LEVEL
il-INEU UNITS 0 66 94 129 230 315
HCTURL UNITS 0 42 52 65 67 72 94 36 104 134 153 190 271 302
RC



TURL/COMM1T 0 13 16 21 21 23 30 30 33 <12 43 60 96 96
The Region obligated $302 million during the past year achieving 96% of its
commitment, leaving an unobligated balance of $224 million. This amount is
less than three fourths of the amount obligated during the past 5 quarters.
                                                     VI  -  2

-------
                       Water 2 - State Program Delegations

                                    National
Approved NPDES Programs
Final Plans § Specs Review
Bid Tabulation Review
Change Orders Review
0§M Manual Review
Interim Inspections
Start 7/1/75

     24
     27
      2
     26
     33
      0
Commitment

    33
    41
    14
    38
    40
     7
Actual 9/30/76

      28
      37
       7
      37
      38
       2
Approved NPDES Programs
Final Plans § Specs Review
Bid Tabulation Review
Change Orders Review
0§M Manual Review
Interim Inspections
      Region VI

Start 7/1/75

      0
      5
      0
      5
      5
      0
Commitment

     1
     5
     0
     5
     5
     0
Actual 9/50/76

       0
       5
       0
       5
       5
       0
REMARKS:
NPDES - Arkansas was planned.
                                      VI - 3

-------
           FY  1976 MRNRGEMENT SUMMRRY  REPORT
3R MfiTER NPDES PERMIT ISGURNCE RNO COMPL 1RNCE--NON-I1UNIC IPRL
X OF MQJOR NON-MUNI  PERMITTEES  IN COMPLIflNCE WITH GCHEDULEG
UJ 1UU
UJ
_,£ 80
ct z:
"7L &-
2 a* 60
z ° 40
^ 20
05
*.
GTRRT
0.' PLRNNEO UNITS 0
X fiCTURL UNITS 0
UJ
LJ
1 75
CJ
| z 45
UJ t-
^UJ30
LJ
o;
CL
05
t.
STRRT
f.r.' PLRNNED UNITS 0
X i^CTURL UNITS 0
REMDRKS)
i 1 1
JUL RUG GC"|oC.T NOV DEc|jflN F

i i
-,B MRR|RPR MRY JUN| JUL RUG GET
(
LEVEL
77 79 82 84 3!3
77 82 86 • . 87 • 87
'/. OF ITjJOR NON-MUNI PERMITTEES IN COMPLIflNCE WITH SCHEDULES

KT"
JUL RUG Gl"j_GCT NOV DEc|jflN F
LEVEL
70 • 70
72 70
~ — 	 >£ 	 J> 	 	 ,
\^f \J ~ \
I 1
EB MflR RPR MHY JUN JUL RUG GE"
S / "3

65 65 65
67 69 71
This graph indicates the percentage of major nonmunicipal permittees reported
to be meeting the compliance schedule requirements of their permits. Region
VI reported that 71% were in compliance at the end of FY-76, well below the
national level of 87%.
                       VI  -  4

-------
                                      FY 1976 MflNRGEHENT SUMMflRY REPORT
                            3H WRTER  NPOES PERMIT  ISSUANCE RNU COMPLIRNCE-NONMUNlCIPflL
                            RECON IN5PECS OF  MRJOR (NON-MUNI) PERMITTEES BY EPR  4 GTRTEG
              STRRT  LEVEL.
O PLRNNED  UNITS    0
X RCTURL UNITS     0
•I, RCTURL/COMMIT    0
3145
1738
 13
6174
3607
9304
7082
 50
12391
3137
 65
J 4 I 50
11301
 SO
                            RECON INGPECS OF  MRJOR (NON-MUNI)  PERMITTEES PY EPR 4 GTflTES
              STflfU  LEVEL
O "LRNNED  UNITS    0
X F1CTURL UNITS     0
'/. RCTURL/COMMIT    0
    REhflRKGs   	
                               176
 13
 324
 420
 35
 500
 834
 73
 679
 1182
 97
 1215
 163S
 135
      This graph reflects nonmunicipal reconnaissance inspections performed by Region VI staff  and
      by the States in the Region.   Region VI staff exceeded its commitment to 225 inspections  by
      12 inspections.  The total of 237 was the  second highest number of  inspections performed  by
      any Region.  The States performed 1,399 inspections, third highest  among the Regions, well
      ahead of their commitment to 990 inspections.   The total of 1,636 inspections is 3.7 times
      the number of major permittees, the second highest such ratio among the Regions.
                                                   VI  - 5

-------
                                         FY 1976 MflNRGEtlENT SUHMRRY REPORT
                              3fl  WfiTER *NPDES  PERMIT ISSUflNCE RND COMPL IflNCE-NONMUNIC IPRL
                             COUPLING  INGPECS OF MflJC NON-MUNI J PERMITTEEG BY  EPfl  f.  STRTEG
               STRRT  LEVEL
O PLRNNED UNITS    0
X RCTUflL UNITS     0
•'. RCTUflL/COMMIT    0
629
 13
1350
1404
 30
2727
2450
 52
3526
3263
 69
4716
4357
 92
                             GHMPL1NO 1NSPECS OF MRJf NON-MUNI ) PERMITTEES BY EPfl t, STRTEJ
              STflRT  LEVEL
O PL
x nc
V. RC
flMNEO UNITS 0 '
-------
                                  FY 1976 MRNflGEIIENT SUMHflRY REPORT
                        3R WflTKR NPDES PERMIT ISSUflNCE WO COMPLinNCE--NON-MUNICIPHL
                              NO. Or EPfl NON-HUN!CIPflL ENFORCEMENT RCTIONS
            STflRT LEVEL
O PLRNNED UNITS    0
X RCTIJRL UNITS     0
'/. RCTURL/COMMIT    0
291
•121
 44
5S5
274
21
867
450
35
1166
623
 43
                                                                            1296
                                                                             764
                                                                             59
                              NO- OF EPfl NON-MUNICIPRL ENFORCEMENT RCT1UNS
            STflRT LEVEL
O fLflNNED UNITS    0
X RCTURL UNITS    0
'i. RCTUflL/COhMIT    0
    REMflRKS's
                            16
                            13
             32
             39
             31
             59
             96
             76
             06
             115
             91
             126
             167
             133
       Region VI exceeded its  commitments  to nonmunicipal Administrative Orders
       and Referrals  to Justice.   No commitment was  made to  Notices of  Violation
       and none were  issued because there  were noideMegated  States in the  Region.
       Region VI issued 158 Administrative Orders,  38 more than its commitment
       and the most  of all Regions.  Also, the Region initiated 9 Referrals to
       Justice, 3 more than its  commitment.   The Region also issued 506 non-NPDHS
       Enforcement Actions, the  most issued of any  Region and nearly a  fourth of
       the national  total of these actions.
                                             VI - 7

-------
                                  FY  1976 MRNRGEMENT SUMMflRY REPORT
                          WRTER 38 NPDES PERMIT ISSUFtNCE RND COMPLIRNCE--MUNICIPRL
                        "', OF  rmjOR MUNICIPRL PERMITTEES IN COMPLIRNCE WITH SCHEDULES
            STRRT LEVEL
o PLRNNED  UNITS    o
X RCTURL UNITS    0
  71
65
64
                           69
                           79
             73
             84
             30
            UJ
            o

            5 100
•/. OF MflJOR MUNI PERMITTEES  IN COMPLIRNCE WITH SCHEDULES
            STRRT LEVEL
O PLRNNED UNITS
X HCTURL UNITS


    REMRRKS:
  25
  16
40
44
45
81
50
90
75
53
    This  graph indicates the  percentage  of major  municipal  permittees  reported  to
    be meeting the  compliance schedule  requirements of their permits.   Region VI
    reported.that 53%  were  in compliance at the end of FY-76.   This  is the lowest
    level  of any Region and well below  the national level of 821.  Regional
    personnel have  indicated  that the third and fourth quarter data  were reported
    incorrectly and are shown too high  on this graph.
                                            VI -  8

-------
                                         FY 1976 MflNRGEflENT  SUI1MRRY  REPORT
                                3D WRTER  NPDES  PERMIT  ISSUANCE RND COMPLIRNCE-MUNlCIPflL
                                RECON INGPECG OF MnjOR(MUNI) PERMITTEES BY EPfl «, GTflTES
               GTflRT LEVEL.
O PLRNNEO UNITG     0
X RCTUflL UNITS      0
•I. flCTUOL/COMMIT     0
1902
2274
 IB
3690
6056
 47
5-163
8998
 71
7290
12529
  98
12752
                                              124
                                RECON INSPECS OF MRJORfMUNI) PERMITTEES BY EF'fl < STRTES
               STflRT LEVEI
O PLflNNED UNITS
X RCTUflL UNITG
"'. flCTUflL/COMMIT
REMflRKS»







This graph
the States
The States
inspections

0
0
0

47
47
16
84
125
43
reflects municipal reconnaissance
in the Region
performed
is about

182
the

Region VI
, only 3 less
same number

134
130
62
inspections
133
227
78
performed
performed 130 inspections, 23
than their total commitment.
of major
AR
COMMITMENT - ~Q



ACTUAL
- 0
municipal
LA MM
15 16
26 16
permittees
OK TX
19 135
31 209
by
Region
more
Hie
in



than
total
292
312
107
VI staff and by
its commitment.
of 312 .
the Region.









                                                       VI  -  9

-------
                                         FY  1976  MRNRGEMENT  SUMMRRY  REPORT
                               3B WflTER  NPDES PERMIT ISSUflNCE RNO COMPLIflNCE-MUNIC IPflL
                              GflHPLINCr IN5PEC5 OF MflJORlMUNI ) PERMITTEES BY EPfl 4 STRTES
                                                   JRN
                       FEB
             MflR  RPR
         MRY
JUN  JUL
RUG
SEP
                                                                                                   IS
                                                                                                75 l_5 JE
                                                                                                   n. ";'
                                                                                                50   g
               STflRT  LEVEL
O PLflNNED UNITS    0
X RCTUflL UNITS     0
'< PCTURL/COMMIT    0
594
1575
1804
 49
2188
2106
 55
 3051
 2768
   12
      3353
      3923
       102
                              SAMPLING INSPECS OF MfUOR(MUNI) PERMITTEES BY EPR 4 STRTES
               STflRT  LEVEL
£' PL
X flC
7. flC
RNNED UNITS 0 42 77 117 153 ZI1
TUftL UNITS 0 33 112 HI 229 314
TURL/COMMIT 0 18 53 67 109 149
REMRRKS>
This graph reflects the number of municipal sampling inspections performed by Region
and by the States in the Region. Region VI performed 102 inspections, exceeding its
ment of 68 by 501. All of the States in the Region met or exceeded their .commitments
performing 212 inspections compared to a total commitment of 143.
AR LA NM OK TX
COMMITMENT - 26 10 7 22 78
ACTUAL - 26 13 9 34 130

VI staff
commit-
                                                     VI  -  10

-------
                                         FY  1976  MRNRGEMENT  SUMMRRY  REPORT
                               3B HRTER  NPDEf, PERMIT ISSUflNCE RND COMPLIRNGE-MUNIC1PRL
                                 NO.  a«n  INSPECT  OF  MRJOR  MUNI  PERIHTTEEG-EPR  <  si me
                                                                                               MOOo
               STRRT  LEVEL
3 ''I.RNNED UNITS    0
X RCTURL UNITS     0
'/. nCTURL/COMMIT    0
1007
729
 J7
1923
H06
 33
2791
2277
 53
3751
3501
 35
4260
4556
 107
                                 NO-  OftM  INSPECS  OF  MRJOR  MUNI  PERMITTEES-ERR  4  STRTE
               STflRT  LEVEL
O PL
X RC
X RC
RNNED UNITS 0 113
TURL UNITS 0 12 X
TURL/COMMIT 0 21
REMRRKSi
Region VI 's 796 inspections
Region** output exceeded its
ance level was partly due to
the transitional quarter.
240 363
2-16 342
41 57
was the second highest
annual commitment .of
an accelerated output
»
434 596
617 796
104 134
total of all Regions. The
596 by 200. This perform-
of 179 inspections during
                                                      VI  -. 11

-------
                                   FY 1976 MRNRGEMENT SUMMRRY REPORT
                          3B WRTER NPDES PERMIT ISGUflNCE RND COMPLIHNCE--MIJN ICIPflL
                                NO. OF EPn MUNICIPAL ENFORCEMENT RCTIONS
            5TRRT  LEVEL
o PLRNNED UNITS   o
X RCTUflL UNITS    0
'/. RCTURL/COMMIT   0
144
129
 13
290
222
 30
439
348
 48
617
510
70
732
604
S3
                                NO- OF EPR MUNICIPRL ENFORCEMENT RCTIONS
            STRRT  LEVEL
O rLflNNED UNITS
X RCTUflL UNITS
7. RCTURL/COMMIT
REMARKS'
0
0
0

4
0
0

9
2
10

15
11
52

21
21
100

21
33
157

       Region  VI met  its commitment  for 1 Municipal  Referralr;td.Justicey and
       exceeded its commitment  to 20  Administrative  Orders by 12 issuances.   No
       commitment to  Notices  of Violation was  made,  and none  were issued because
       there were no  delegated  States in Region VI.
                                             VI -  12

-------
                                         FY  1976  I1RNRGEI1ENT  SUMMRRY  REPORT
                          3C HRTfcR  NPDES PERMIT ISSURNCE flND COMPLIHNCE - FEDERRL FRCIIIT1EG
                                 NO. TED FRC OPER5 EXRMINED FOR COMPL W/PERMIT PROV
               GTflRT  LEVEL
0 PLRNNF.U UNITS    0
X RCTURL UNITS     0
'I. RCTURL/COHMIT    0
       91
       107
       23
                  174
                  206
                  44
249
282
60
349
336
82
469
510
109
                                 NO- FEU r-'nc OPERS EXRHINED FOR COHPL H/PERMIT PROV
                     JUL
RUG
—I—I
 5QF|OCT I M
               GTflRT  LEVEL
G PLRMNED UNITG
X (1CTURL UNITG
'/. RCTUF11./COHI1IT




Region
facili
65 maj



VI
ty
or
0
0
0
exceeded
permittees
permittees
15
19
23
o
L.
rt
2
0
3
3
its commitment by 11!
, the
were
highest
number
found to be in
25
41
49
k. The
of all



Region
40
73
83
has
the Regions
violation of
their
83
92
111



65 major federal
Ten out of
compliance
the

schedules.
                                                      VI  -  13

-------
                                         FY  1976  MRNRGEMENT  SUMMRRY  REPORT
                      4fl WRTER  PREP OF-  EISG «• NEG DECLRRRTIONS FOR EPR'G WWT PLT CONSTRUCTION ORTG
                                  NO. FINRL  EISS  FILED W/CEQ ON CONSTRUCTION GRRNTS
to
_j i«J 200
l£
5s150
z | 100
0
T
ffl 	 	 fr ~~ — 5
1 I
JUL RUG GLp|oCT NOV' OEc| JRN FEB MRR^
	 . 	 . 	 -® 	
	 ^11*
&^. — —i — — 7\^
tl
RPR MRY JUN| JUL
—
RUG
. 	 i
GEP
— .j
c!)
f £
cn '-
jjoo^l
= 75 " 2
50 *v'
25
0
               STRRT  LEVEL
O PLRNNED UNITS    55
X RCTURL UNITS     55
•'. RCTUflL/COriniT    53
BZ
62
60
71
63
61
89
66
64
103
73
71
103
86
83
                                  NO.  FINRL  EISS FILED H/CEQ ON CONSTRUCTION  GRRNTS
               STRRT  LEVEL
O PLRNNEO UNITS
X nCTURL UNITS
'i. HC
TURL/COMMIT
REMflRKSj
11
ii
79
12 13
13 13
93 93
Region VI achieved its commitment.
number of final EISs filed with CEQ
filed with CEQ.
15 14 14
13 14 14
93 100 100
Region VI and Region IV have the highest
(14). Also Region VI has 15 draft EISs
                                                     VI  -  14

-------
                             Water 5 - Water Supply

                                    National

1.   Number of Water Supply Program grants awarded.                        53

2.   Amount of FY-76 program grants awarded.                               $7.5 million

3.   Number of Water Supply Program grants refused (Pennsylvania,
     Indiana, and American Samoa).                                          3

4.   Amount of FY-76 program grants reallocated.                           $482,300

5.   Number of States and territories expressed intention to assume
     primary enforcement responsibilities.                                 54

6.   Number of States and territories expressed intention not to assume
     primary enforcement responsibilities (Pennsylvania and Indiana).        2

7.   Number of States and territories assumed primary enforcement
     responsibilities as of September 30, 1976.                             0

                                    Region VI

1.   Number of Water Supply Program grants awarded.                         5

2.   Amount of FY-76 program grants awarded, including reallocated
     funds.                                                                $909,900

          a.  Arkansas     $ 84,500       d.  Texas      $451,900
          b.  Louisiana    $137,000       e.  Oklahoma   $132,800
          d.  New Mexico   $103,700

3.   Number of States expressed intention to assume primary enforcement
     responsibilities.                                                      5

4.   Number of States assumed primary enforcement responsibilities as  of
     September 30, 1976.                                                    0
                                      VI  -  15

-------
                      Water 6 - Section 208--Water Quality Management Planning

                                              National

                         Region:    I     II     III     IV     V      VI    VII    VIII   IX     X     Total

1.  Number of areawide
    designations approved
    and funded                     18     14      12     32     32     13     5     22     17    11     176

2.  Amount of funds
    obligated ($M)               $ 13.24  24.25   17.86  23.00  39.59   9.65  5.79  12.55  14.61  6.56  167.10

3.  Number of areawide
    work plans completed
    and approved                   15     11      12     26     25      95     21     10    10     144

                                              Region VI

1.  Number of areawide designations approved and funded --13

          a.  Arkansas    3
          b.  Louisiana   0
          c.  New Mexico  0
          d.  Oklahoma    2
          e.  Texas       8

2.  Amount of funds obligated ($M) -- $9.65M

          a.  Arkansas    0.45
          b.  Louisiana   0
          c.  New Mexico  0
          d.  Oklahoma    2.71
          e.  Texas       6.49

3.  Number of areawide work plans completed and approved --9
                                             VI  - 16

-------
                                 FY 1975 MRNRGEI1ENT SUflllRRY  REPORT
                                7  WRTER  SFH.L PREVENTION flND CONTROL
                               NO. GPCC PLRN COMPL/IMPL INSPECS
            STflRT LEVEL
O PLflNNED UNITS  5922
X RCTUOl UNITS   5922
•'. flCTUflL/contm   so
8301
9759
 83
9762
12283
 104
11813
13289
 112
                               NO- T.PCC PLRN COMPL/IMPL IN5PEC5
            STflRT LEVEL
Q "LRNNED UNITS   265
X ncTURL UNITS    265
•/. RCTUflL/COMMIT   30
    REM9RKSJ	
377
490
 55
 SIS
 335
 93
 393
 937
 110
     As  of Sept.  30,  1976, Region VI completed 987 SPCC  plan  and  implementation
     inspections,  o£  which a  total 265 were  carryovers  from previous years,  and
     722 were completed during  FY-76 including the transitional period.  The
     Region's FY-76 output ranked fourth among the Regions, and its  total output
     exceeded its  annual commitment of 898  inspections.   The Region  performed  some
     of  these inspections in  the Houston area through  the use of contract support.
     The Region's  effort was  also assisted with the use  of aerial  photography.
                                            VI  -  17

-------
                 100
                                         FY  1976  MflNRGEMENT  SUHMRRY  REPORT
                                   WRTER   STRTE MONITORING PRODRRMS ;  QURL1TY  RGSURRNCE
                                        NO.  OF  STRTE  LRBORRTORIES EVRLURTtO
             




Region
Region
in FY-
check
0
0
.0
VI

i
i
17
was committed to evaluating
utilized the
75.
of
Region VI
samples.
methodology used
has instituted a
•
b
6
100
6 laboratories and
by EPA in evaluating
6
6
100
evaluated
Regional
program for continual quality



6. The
labs
control

                                                     VI  -  18

-------
            50000
                                  FT 1976 H.nNflGEMENT SUMHFIRY REPORT
                         2C  R1R   - FISSURE COMPLIANCE WITH FUEL. RDDITIVE REOULRTIONG
                               NO GPS SRMPLES TESTED BY FILLD/LOB METHOD
            STRRT LEVEL

-------
                    3R RIR
           LJ
           a:
       FY  1976 MRNRGEMENT SUMMRRY REPORT
 ENGURE CONTINUED COMPLIRNCE WITH SIP REQUIREMENTS  IN EHCH STRFE
  NO. IDENT PT SOURCES IN FINflL COMP W/EMIGC RECG
             20000-
          o: to
          2 £ 1500!
          a: a:
          2 % 10000
           z:
           z  5000

                0


^t
                               OCT
       NOV
i
DEC.  JflN
FEB
       MHY
i
   JUL
             STRRT LEVEL.
o PLONNED UNITS  13920         H53i
X RCTUflL UNITS   13920         H83:)
•>. dCTURL/COMMIT   70  '         75
            15418
            16984
              85
              15959.
              18060
               91
            15976
            1792-1
              30
            19SS1
            18367
                              NO.  IDENT  PT SOURCES IN FINRL COUP W/EMISS REGS
             STflRT LEVEL.
O ''LflNNEO UNITS  1024
X RCTUflL UNITS   1024
•'. RCTURL/COMMIT   69
    REMRRKS»	
11 M
1171
 79
 1231
 1Z69
  06
1343
13G2
 92
1475
H71
100
                                                     1475
                                                     1731
                                                     117
      Region VI  was  the only  Region  to exceed its  FY-76  commitment for  having
      point sources  come into final  compliance.   Of the  1,916  known sources  in
      the Region, 901  are  in  final compliance and  an additional  5% are  in
      compliance with  schedules.  The combined  total of  95% in compliance compares
      favorably  to the national level of  92% and  ranks Region  VI  third  among
      the Regions in overall  point source  compliance.
                                              VI  -  20

-------
                 FY 1976 MflNRGEMENT SUMMRRY REPORT
3fl flIR   - ENSURE  CONTINUED  COMPLIRNCE HITH  SIP REQUIREMENTS IN ERCH STRTE
      NO  IDEMT PT GRC OUT OF COM H/FNL  EMISS REQ  NOT ON  SCO



uj iauu
CJ
cc
_. o 2000
2 fe isoq
cc o^
z In 1000
z:
z 500
0
»
£
STRRT
-
" • — o — . : 	
_

OCT NOV DEC
LEVEL
O rLDNNED UNITS 1396 1109 81


-©- 	 .
ti
URN FEB MflRJnPR M

1 559
X nCTUni UNITS 1396 1605 1606 1330



2 250
o
oc
g o 200
0 in
2 ° isd
^ m 100
•c.
Z 50
0
STRRT
NO 1DENT PT SRC OUT OF COM W/FNL EMISS REQ

~
. . ~~^

OCT NOV DEC
LEVEL



1
JRN FEB MOR! RPR M

O pLf)NNEO UNITS 150 139 109 70
X DC
TUflL UNITS 153 156 153 J61
W


" — -e 	
JUL R

284
1406
NOT ON SCO

~~~^-->^
^^\
1
3Y JUN | JUL fl

46
124
	 1


UG SEP

C

)
284
1226


\,
-<
	 '(
JG SEP
1




46
61
Region VI did not meet its FY-76 commitment for reducing the number of
point sources in violation. In addition to the 61 sources in violation
of final SIP requirements, 7 sources are in violation of applicable
compliance schedules. The 68 sources in violation represent 41 of the
known sources in the Region which is slightly lower than the 1\ violation
level reported on a national basis.
                              VI  -  21

-------
                                  FY  1076 MflNRGEMENT SUIIMflRY REPORT
                    3fl flIR   - ENSURE CONTINUED COHPLIRNCE WITH SIP REQUIREMENTS IN ERCH STflTE
                                RNTICIPflTED NO ENF flCTS BY EPR
            STflRT LEVEL.
O "LflNNED UNITS   0
X fiCTURL UNITS    0
'/. nCTURL/COMMIT   0
192
226
21
435
395
3G
642
532
49
843
790
72
1094
1091
100
                                RNTICIPRTED NO ENF flCTS DY EPR
            STflRT LEVEL
O "LP1NNED UNITS    0
X RCTURL UNITS    0
''. RCTURL/COnniT    0
    REMflRKSs
16
12
18
33
!9
28
52
28
41
63
32
47
 68
 33
 49
      Region VI  did not meet its FY-76 commitment for  air enforcement actions.
      The 33 actions consisted of  20  Notices  of Violations and  13  Abatement  Orders
      No civil/criminal proceedings were initiated by  the Region.   The States
      in the Region also  undertook a  substantial number  of enforcement actions.
      The number of State actions  is  not documented here since  each State  uses
      a slightly different definition of what constitutes an enforcement action.
                                             VI -  22

-------
                 Air 3B a Air 6 - Delegation of NSPS and NESHAPS

                                    National

Number of States

          Delegated      Start Level    Commitment     Actual 9/30/76

            NSPS              2             41               23
           NESHAPS            2             33               17


                                    Region VI

Number of States

          Delegated      Start Level    Commitment     Actual 9/30/76

            NSPS              0              2                0
           NESHAPS            02                0
REMARKS:
The Region missed its FY-76 commitment.  Significant progress has been made in
the States of Oklahoma and Texas, and a draft request for delegation has been
received from Texas.
                                      VI -  23

-------
                                         FY 1976 (IHNRGEtlENT SUMMRRY REPORT
                        7  RIR   - ENSURE  COMPLIRNCE OF FEDERRL FRCILITIES  WITH  SIP REQUIREMENTS
                                     NO-  FED  PT.  SOURCES  IN COMPLIRNCE WITH  SIPS
               STflRT LEVEL
O PLRNNED UNITS   118
X HCTURL UNITS    118
'.'. CfCTUflL/COMHIT    36
                  isi
                  139
                  43
171
161
49
221
145
 44
259
249
 76
326
246
 75
UJ

? 50
                                     NO.  FED  PT.  SOURCES  IN  COMPLIRNCE  WITH  SIPS
               STflRT  LEVEL
O PLflNNED UNITS 8 14 21 25 30 30
X HCTUOL UNITS 8 12 13 19 29 33
''. RCTURL/COttdlT 27 40 43 63 97 110
REMRRKSi


Region VI has exceeded its commitment by 10%. Also, §3% of its 41 federal
point source are either in compliance with SIPs or on a consent declaration.

-------
                 FUR
             f-Y 1976 MHNHOEI1ENT GUMi'KlRY KEI'fiRl
        hNSURE COMPLIANCE  OF FEDERAL FACILITIES NITII SIP REQUIREMENTS
LO
O
a:
_j § 200
en m
2fe 150
f—
CE rc
z£lO(I
1 5G
^
N.'J- 1-tU
	 _-K 	

I
JUL RUG OF.!!'] OCT N
|-'|. SUUKLttj UUI Ul- (,iJI1rLlllNLt WIIII SIPS
	 W— f1! O

1 1 1
3V DEC 1 JRN FEB HflR 1 RPR MFtY JUN 1 JUL RUG GtP
      STRRT LEVEL
1.0 PLRNNED UNITS   101
X RCTURL UNITS    101
                      112
                      12S
                   118
                   123
                                        120
                                        74
                                     121
                                     90
                                                                                  111
                                                                                  82
       £25
       (J
       a:
10*

 5

 0
            JUL
RUG
      STRRT LEVEL
O PLRNNED UNITS
X HCTUflL UNITS

    REMRRKSs
         10
         10
                        MO. FED PT. SOURCES OUT OF COtlPLIRNCE WITH SIPS
                                    -Jf-
                                   •—e
                                -e-
OCT
                     NOV
                                        DEC  JRN
                                                 FEB
MRR  RPR
MRY
JUN  JUL
RUB
       7
       10
                           5
                           11
                        5
                        11
                                                                                  4
                                                                                  5
Thirteen  percent  of Region  VI's federal  point  sources  are  out of  compliance
with SIPs.   One  of the  5 sources  out of  compliance  is  on a consent
declaration and  2 federal point sources  are of unknown status.
                                       VI  - 25

-------
             FT 1976 MRNRGEMENT SUMMRRY REPORT
1  PESTICIDES  -  ESTRBLISH  OPERRTIONRL  STRTE  CERT IFICRTION  PROGRAMS
           NO. STflTE SECT.  4  CERT PLRNS RPPROVED
a /o
UJ
>
_, £ 60
a: o_
z a.
0 ^ AC
»-. 45
1— £E
d UJ
z£30
ID
•y
15
*
°l
*

_

	 —
^©-^

" — — -^1^1— -^*——
*""" ¥ "~~ i
JUL RUG GEP| OCT NOV DEC| JRN F
STRRT LEVEL
c; PLRNNED UNITS 3 12 so
X fiCTURL UNITS 3410
I
7. RCTURL/COMMIT 6 8 19



— - -^'" —


__ 	 ^e- 	 '

RPR M

43
J5

29


fT\ f
— ~— ~ " "" "

_>«____—- 	 -i

-

JUL RUG SEP

ci>
2 »-
)1002 .f.
z ^J
en =
TC: _J •-
/b Q .-.
2_
C u_ ^
50 o C1
>*•
Z5
0

5Z 52
25 30

48 58
NO. STRTE SECT. 4 CERT PLflNS RPPROVED
i n
CD 1 U
>
gg 8
z °-
>— i ^
2 2

-------
                                         F Y
                               PESTICIDES -
                                    NO- USE
1976 miNfiGEi-'.ENT
ENSURE PROPER  USE.
PND RE-ENTRY INVE
                                   REPORT
                             HND fiPPLICfll ION OF PES I 1C IDES
                             TIGATIONS CONDUCTED
               STRRT LEVEL
© PLHNNEO UNITS    0
X RCTURL UNITS     0
''. RCTUHL /COMMIT    o
325
 28
    344
    472
     41
499
692
 60
791
1162
100
1159
1399
 121
               z
               o
                                    NO. USE flND RE-ENTRY INVEST IGHT IONS CONDUCTED
               STRRT LEVEL
O F'LflNNEO UNITS 0 10 20 30 40 120
X nCTURL UNITS 0 24 39 69 93 . 103
•>. RCTURL/COMIIIT o 20 33 so 78 oe
REMRRKSs




Region VI set a commitment level of 120 investigations; only 2 Regions




had
higher commitments, and fell 17 short of obtaining this commitment. Region
VI is the only Region that did not reach its commitment, however, among
Regions, they ranked fifth in the total investigations conducted.
all

                                                      VI  -  27

-------
              co
                5000
                                         FY 1976 MflNflGEMENT SUMMflRY REPORT
                        ZC PESTICIDES - CONT EFFECTIVE REGIONflL FOCUS ON INDUSTRY COMPL W/REG REQ
                                      NO. OF PRODUCER ESTRBLISHMENTS INSPECTED
               STflRT LEVEL
O PLRNNED UNITS    0
X flCTUflL UNITS     0
~t. nCTUflL/COMMIT    0
372
535
 23
831
1145
 SO
1278
1802
 79
1718
2264
 99
2290
2685
 117
               co
               13 500
                                      NO. OF PRODUCER E5TRBLI5HMENTS INSPECTED
               STORT LEVEL
o PL
X HC
•/. nc
BINNED UNITS 0 50 100 150 200 275
TIJHL UNITS 0 55 96 177 241 320
TURL/COMMIT 0 20 35 64 88 116
REMflRKSi

Region VI exceeded its commitment by completing 16% more inspections than
it had anticipated. The extent of this Region's involvement in this
program is seen in its 320 inspections. This figure ranks Region VI third
in total number of inspections and fourth with 1161 of achievement level.
The inspections resulted in 24 civil actions and 18 stop sale orders.

-------
LU
S 50
                                       FY 1976 (IfiNflGEhENT SUHMflRY REPORT
                      1  SOLID WflSTE - DEV f.  IMPLEM COMPLEM ST 4  FED STRflT TO UPGRRDE
                                NO. STflTE STRRTEGIES FOR CONTROL OF DISPOSflL SITES
                                                                   3T  SW PROGS
              STflRT  LEVEL
CD PLflNNF.0  UNITS    0
X RCTUflL UNITS     0
'/. flCTUflL/COMMIT    0
                  5
                  5
                 11
  14
  11
  24
       41
       26
       58
                45
                37
                82
                                                                    45
                                                                    •13
                                                                    96
               in
               UJ
                                NO. STPTf. STRRTEG-IES  FOR CONTROL OF  DISPOSAL SITES
               5 10
             2 u.  6
             , >> o
JUL  RUG
                                -"£
                                  OCT
                        NOV
DEC  JflN
FEB
MflR  RPR
              STfiRT  LEVEL
O PLANNED UNITS
X RCTURL UNITS
7. RCTUflL/COtiniT
REMORKG^
0
0
0

0
0
0

0
0
0

2
0
0

*7
2
67

3
3
100

      Region  VI met  its commitment by  obtaining  100%  achievement  level.
                                                   VI
                                           29

-------
               to 50
               z
               en

             _i E! 40
             
-------
REGION VII

-------
        END-OF-YEAR  REPORT-- REGIONAL OVERVIEW

                                    REGION VII

     During FY-76,  92  output  commitments were monitored through the  Formal  Reporting
System,   Region VII and the States in the Region met or exceeded 47  commitments, nearly
met 14 more,  and did not meet 26.  In addition, no commitments were  made  for  5 outputs.

     Region VII obligated  over $246 million of its municipal construction funds,
which represents 92% of its commitment.  The national average was 84%.  For FY-77,
the Region has $216 million in unobligated P. 92-500 funds.   Region  VII has 851
total awards,  far above its planned levels.  The large number of Step  1 awards upset
the planned mix for Steps  1,  2, and 3 awards (planned mix,  46%-27%-27%; actual mix,
63%-17%-20%).   During  FY-76,  Region VII did not file any final or draft EISs  with
CEQ on construction grant  actions.

     Region VII increased  its total State program delegations to 14, an increase of
4, which was 1 more than expected.  Iowa accepted final plans and specifications
review,  change order review,  and O&M manual review programs, and Nebraska accepted
the change order review program.

     Region VII reported that 85% of the major honmunicipal NPDES permittees  in the
Region were in compliance  with the compliance schedule requirements  of their  permits
at the end of FY-76.   This is slightly below the national level of 87%.   The  Region
and the States conducted a total of 428 reconnaissance and sampling  inspections of
major nonmunicipal permittees.  This is about the same level as planned and less
than 2 times the number of major nonmunicipal permittees in the Region.   These
activities resulted in 13  enforcement actions against major and minor  nonmunicipal
permittees, less than  a third of the planned level.

     Overall compliance of major municipal permittees with the compliance schedule
requirements of their  permits was reported to be 80% in Region VII,  slightly  below the
national municipal compliance level of 82%.  This was well above the 71%  level planned
by the Region.   The Region and the States conducted 787 reconnaissance and  sampling
                                      VII - i

-------
 inspections, higher than planned levels and almost twice the number of major
 municipal permittees in the Region.  These activities resulted in 60 NPDES
 enforcement actions against major and minor municipal permittees, well below
 planned levels.

     Region VII has issued 25 major federal facility permits.  Sixteen percent
 were found to be in violation of their permit compliance schedules (the national
 average is 17.6%).

     During FY-76, Region VII completed 514 O&M inspections, exceeding its commitment
 of 335.  Region VII awarded water supply,grants to all of its States, totaling
 $504,900.  The 4 States in the Region are expected to assume primary enforcement
 responsibilities.

     Region VII's Section 208 areawide designations are limited to Iowa and Nebraska
with a combined total of 5 areas and a grant total of $5.79 million.   All of the
project work plans have been completed and approved.

     Region VII completed 700 SPCG plan and implementation inspections.   This output
exceeds its annual commitment of 550.   The Region evaluated 4 State pollution
 laboratories,  missing its commitment by 2.

     In the air media,  Region VII nearly met its FY-76 commitment for bringing
sources into final compliance.   Ninety-three percent  of its.known sources are either
in final compliance or in compliance with schedules.   This compares to a 79%
compliance level at the end of FY-75.

     Region VII is 1 of 3 Regions that exceeded its commitment for number of federal
point sources in compliance with SIPs.  There are no  federal point sources of unknown
status in this Region.

     Region VII exceeded its commitments for field surveillance and enforcement
actions taken to ensure point source compliance.  Emphasis was placed on enforcement
in Air Quality Control  Regions (AQCR)  which were not  achieving ambient air quality
standards.   Ninety-eight percent of the enforcement actions were taken in these
AQCRs.


                                      VII - ii

-------
     Region VII did not meet its FY-76 commitments for delegations of NSPS and
NESHAPS enforcement authority.   The Region was only able to grant the NSPS authority
to Iowa and Nebraska.

     Iowa is the only State in Region VII to have a pesticides Section 4
Certification Plan approved.  Region VII exceeded its commitment in both use and
reentry investigations and producer establishments inspected,  resulting in more
civil actions warnings issued than any other Region.

     Region VII has submitted 4 State strategies for control of disposal sites and
4 State strategies for hazardous waste disposal, exceeding planned levels.  However,
the Region did not complete any federal facility strategies for compliance with
Sections 209 and 211 of the Solid Waste Disposal Act.  Region VII planned to have
federal facility strategies developed and implemented in all of its States.
                                      VII - iii

-------
                                      FY 1976 HflNnGE.Mf.NT SUMMflRY REPORT
                                  WflTER - MUNlCIPflL FflCILITIES PROGRf'ill HfiNRGE.HENT
                                      NUMBER OF CONSTRUCTION ORfiNT
              3TflRT LEVEL
X fiCTURL  UNITS
l&Z   383  S35  905 i 173 iSIS  1372 2345 2660  3004 33^2 3T77
                                                            4649
                                      NUMBER OF' CONSTRUCTION GRHNT
              STflRT LEVEL
X fiCTURL UNITS
23
49
143   203  282  333   430  til 1   i,71   624  704
85 i
    REMfiRIU
     Hie Region surpassed its original FY-76 plan by over 3001 and was  second only to Region  V in
     total awards made.   The Region exceeded its  plans for each Step, issuing the second highest
     number of Step  3  awards nationwide.  Despite this outstanding accomplishment, the award  mix
     was tilted in favor of Step 1 awards at the  expense of Step 2 and  Step 3 awards:  46%-27%-27'i
     planned versus  63%(532)-11\(145)-201(174)  actual for Step 1, 2, and 3 awards, respectively.
     The planned mix for FY-77, 44%-29%-27$, is nearly the same as the  past year, with slightly
     more emphasis on  Step 2 awards.
                                                   VI1  -  .1

-------
                                    FY  1976 nnNHGEHENT  SUMI1!IRY REPORT
                              1  WFITtR - MUN1CIPRL FHCUITILS PROGRHI1 I-K1NHGEMENT
                             DOLLRR VRLUE OF CONSTRUCTION GRRNT RNRRUS mil LIONSJ
             STRRT LEVEL
 PLRNNEO UNITS    0
:< nciuflL UNITS     o
x ncTURL/conniT    o
        1088          1653          2261          .16-13
219  614  7313  893 1157  1652 1790 1999 22S9 2-113 2789 -11-11
 4   9   13   16   20  29   31   35   39   -12  -I'J   7/.'
5739
4809
 84
                             COLLHR VflLUE Oh CONSTRUCTION GRHNT HWRRU;"i  MH LIONS J
             STftRT LEVEL
O PLRNNED UNITS    0            24
X DCTURl. UNITS     0   5    9    25   34   30
''. HCTUHL/COI1MIT    0   2    3    9   13   14
                      100           162          234
                      100  103  i08  146  149  156  215
                      37   39   40  55   56  58   01
267
246
 92
       Despite the  Regions's  high number  of awards for  the  year,  the dollar  obliga-
       tion  goal was missed by  8%  (92% achieved).   The  Region obligated $246
       million Which leaves an  unobligated  balance of $216  million for  FY-77,  an
       amount which is  less than 901  of the total  obligations for  the past 5
       quarters.
                                                VII  -  2

-------
                       Water 2 - State Program Delegations

                                    National
Approved NPDES Programs
Final Plans § Specs Review
Bid Tabulation Review
Change Orders Review
OfjM Manual Review
Interim Inspections
Start 7/1/75

     24
     27
      2
     26
     33
      0
Commitment

    33
    41
    14
    38
    40
     7
Actual 9/30/76

      28
      37
       7
      37
      38
       2
Approved NPDES Programs
Final Plans § Specs Review
Bid Tabulation Review
Change Orders Review
OfjM Manual Review
Interim Inspections
     Region VII

Start 7/1/75

      3
      2
      0
      2
      3
      0
Commitment

     3
     3
     0
     3
     4
     0
Actual 9/50/76

       3
       3
       0
       4
       4
       0
REMARKS:

NPDES - Only Iowa does not have.
Plans Jj Specs - Only Nebraska does not have.
                                      VII -  3

-------
                                    FY 1076 MflNRGEHENT SUHMHKY KH'OIU
                          3fl WflTLR NPDES PERMIT ISSUANCE  ClND mil PL I liNCi:••-NON-MUNlCIPfiL
                          '', Or MfiJOR  NON-MUNI  PERMITTEES IN COWL IliNCt: WITH  SCHEDULES
                                                            	&
             GTRRT LEVEL.
o PLRNNED UNITS    o
X RCTUflL UNITS     0
77
77
79
82
36
  84
  87
                          35
                          37
             S 100
             _l
           ol 80
             o
           § 5 60
           o
           UJ H-
           t z 40
             a. 20
                Of
                          V. OF I1RJOR  NON-MUNI PERHITTth'S IN  COMfL 1HNCE WITH  SCHEDULES
                   JUL
                                    NOV
           OEC  JflN
                                                 PER
           HHR  RPR
       nfiY
JUN  JUL
                                                                           nuc
             STflRT LEVEL
O PLRNNED UNITS    0
X RCTUflL UNITS     0
30
31
30
81
30
8!
  85
  34
SLP
     This  graph  indicates the  percentage  of major nonmunicipal permittees  reported
     to be  meeting the  compliance schedule  requirements  of their permits.   Region
     VII reported  that  851 were in  compliance at  the end of  FY-76,  slightly below
     the national  level  of 871.
                                              VII -  4

-------
             CJ
           FY 1076 MfiNflGEMENT  SUMMHRY REPORT
3f1 WftTER  NPDF.S PERMIT  ISSUfWCE f)NU COMI'L IfiNCE-NONHUNIC IPflL
REC.ON INSPECG OF IIDJflR f NON-HUN H  PERU HUES  BY  C.f'fi « STfiTtS
              GTRRT LEVEL.
O PLfiNNED UNITS     0
X fiCTURL UNITS     0
V. fiCTUfiL/COIIMIT     0
   31-15
   173S
    13
B17-1
3G07
9304
7082
 50
1L'3=)1
0137
HlbG
11301
 30
                            RECfJN 1NSPECG fJF MfiJOR  fNON-MUNIl PERM]TTI:.tS liiY rPO 4  STRTES
              GTRRT LEVEL
C PLflNNED UNITG     0
X RCTURL UNITS      0
•I. RCTURL/COIiniT     0
    67
    70
    23
 123
 lib
 46
 178
 175
 69
 210
 235
 94
 25Z
 27/1
 109
     Tliis graph reflects nonmunicipal reconnaissance inspections performed by Region VII  staff and
     by the States  in the Region.   Region VII  exceeded its  commitment of 105 by performing 110
     inspections    Of the States  in the Region,  only Kansas, did not meet its commitment,   live
     total of 274 inspections is  slightly greater .than the  number of major nonmunicipal permittees
     in the Region.
                                                    VIT -  5

-------
                                          FY  1076 MflNflGEMENT SUMNfiRY REPORT
                              3fl UflTER   NPDEG  PERMIT ISSUANCE. fi.ND CflNPL H1NCE-HONI1UNICIPRL
                              GRMPLING INSPE.CG OF NflJfNON-HUNII  PERI1ITTLE& fiY LPfi 4 GTRTtS
               STflRT LEVEL
O PLfiNNEO UNITS     0
X fiCTURL UNITS  '   0
V. RCTUfiL/COIiniT     0
629
 13
1850
H04
 30
2727
2-150
3526
3263
 59
4716
4357
 92
                                                                                     GTRTES
               STRRT LEVEL
O PLRNMEO UNITS 0 35 73 i03 127
X fiCTURL UNITS 0 33- 67 92 115
'/. flC




TURL/COimiT 0 22 33 53 66
REMflRKG *
175
154
OS
This graph reflects nonmuiiicipal sampling inspections conducted by Region VII staff and
States in the Region. Region VII performed 68 inspections, exceeding its commitment to
form 45. The States in the Region performed 86, compared to a total commitment of 130.
Iowa met its commitment.
IA KS MD NE
CONMITMENT - 35 W 15 20
ACTUAL - 43 30 2 11






by the
per-
Only




                                                      VII  -  6

-------
                                   FY 1076 MfiNRGEMENT SUHMfiRY REPORT
                           MflTE'R  NPDtS PERMIT  ISSURNCE fi.MO COMPL 1 HNl-'F. - -NON-MUNICIPflL
                               NO. OF  EPn NON-MUNICIPflL ENFORCEMENT fiCHONS
             STRRT LEVEL.
O PLflNNED UNITS   0
X RCTlJfiL UNITS    0
V. flCTURL/COMMIT   0
291
121
44
274
21
067
450
1 166
S23
 43
129G
764
 59
                               MO. OF  EPR NON-MUNIClPflL ENFORCE. HE Ml RCTIONG
                  JUL  RUG  &E.P  OCT  NOV
             STRRT LEVEL.
O F-LflNMED UNITS
X fiCTURL UNITS
'/. RCTURL/COMtm
0
0
0
13
3
5
26
4
7
3-9
11
19
                                                                                13
                                                                                22
       Region VII did  not meet  any of  its 3 nonmunicipal Enforcement  Action
       commitments.  The Region committed to  16 NOVs,  but did not  issue any  to
       its 3 delegated States.   Seven  Administrative  Orders  were issued against
       a commitment of 34, and  6 Referrals to Justice  compared to  a  commitment of
                                              VII  -  7

-------
                                    FY  1376 MflNfiGEMENr SUHIinKY REI'lilTT
                           MRTtR 3B NPDES  PERMIT IGGUflNCE RNP CfJIH'L I HNCF.--NUN 1C [PflL
                          x OF i-injoR MUNiciPfiL PERMITTEE::; IN conpLifiNf.T WITH GCHEOULEG
             5TRRT LEVEL.
o PLRNNED UNITG    o
X flCTUfiL UNITS     0
59
71
  64
           f.3
           70
                                       13
                            'i. Of flflJOR MUNI PEF^MITTffS  IN CCJI1PL IRNf-f: WITH SCHEDULES
                                                                    —e
                           f,LP  OCT
       NDV
DEC.
JRN
FEB
I1RR  RPR
                                                                   JUN
JUI.
RUG
JCP
             STRRT LEVEL
O PLRNNED UNITG    0
X RCTURI. UNITS     0
75
70
  70
  70
           70
           70
                    6rJ
                    SO
                             71
                             80
    REM'iKIU
     This  graph  indicates the percentage  of major municipal permittees reported  to
     be meeting  the compliance schedule  requirements of  their  permits.  Region VII
     reported that 80%  were  in compliance at  the end of  FY-76,  slightly below the
     national level of  821.
                                                VII  -  8

-------
                                       FY 1076 miNfiGEMENT  GUHIIfiKY REPORT
                              3L! HRTLR  NPUES PERMIT ISGUHNCIi flND  COI1PL1 UNCI..-HUN 1C IPfll.
                              RECUN INSI'ECS  Or  tlflJORf HUNIJ PERMITTtfG BY  n'Ci 4
              STRRT LEVEL
(D PLfiNNED UNITS     0
X RCTUfiL UNITS      0
•/. RCTUfiL/COHniT     0
                     JUL  RUG  &EP  OCT  NOV   DEC  JflN  FED  MftR  RPR   11HY  ,IUN  JUL  RUG  GE.P
1002
2274
 13
3600
6056
 41
5163
0998
 71
7290
 03
12752
               124
                              RECON INGPECS OF  MfiJORtMUNlJ PERMITTEES BY bl'H 4  STflTLS
              GTRRT LEVEL
(!) PLfiNNED UNITS
X fiCTUflL UNITS
'/, flCTUHL/COMMIT
    REMfiRHG;
0
0
0
122
121
27
235
197
45
320
282
61
.110
•139
99
442
S29
120
      Tliis  graph reflects  municipal reconnaissance inspections conducted by Region  VII staff and
      by the  States in the Region.  Region VII performed 160 inspections, 20 less than its commit-
      ment, but the second highest number of inspections among the Regions.  'Die States performed
      369 inspections, 107 more than their total commitment.
                                                   IA    KS   MO    NE
                                    COWIITMENT  -  80   42"   ~65   T5
                                    ACTUAL       - 100   26   142   101
                                                    VII  -  9

-------
          FV  197S  MfiNflGEMENT SUMIIflRY  KE.I'ORT
36 MUTER  NPDE.S  PERMIT ISSURNCE  RND  f.Onf'L IfiNCE-HUN 1C 1PRL











^ uHHI'LlNU INrjI't.Hi Uh riHJLWiriUNM rtKniMLto 1)1 I-I'H * ulHlto
UJ
in
_j 2 4000
CC *-'

2 o 3000
(~
a: ft:
2 « "nnn
OO fcUUU
21
z 1000
rift
oc
4
STRRT


^^

-^--•'^'
_^-**p"" """"^ ^rV^
— --^— - — — ' 	 "

'^^^^^~^f^
K ' 	 — — —
JUL flUG SEP OCT NOV DEC JfiN FEB HflR flPR Mfi'Y JUN JUL RUCr SEP
LEVEl

O
5iOOg »-
z *'
75 5 l?'-'
	 1 *~~
CL. '" '
~

,
O PLfiNNED UNITS 0 022 1575 2100 305i 3053
X RCTURL UNITS 0 59-1 1934 2106 2763 3923
'>. RCTURL/COHMIT 0 15 49 bb 72 102














u_, SflHPLING INSPECS OF MHJORIMUNI) PERHITTKtS BY EFR 4 GTRTES
i r' f*i n
O jUU
UJ
C.
£5100
2-
2 o 300

UJ Cf
°-' m 200
zr

z 100
Gt
i


-

-
^
^^____ 	 -^Z^,
_^^—^^r^^^''^'^ • -

__^ -
, 	 ^fS-^^-^7 " -
j I I I 	 	 —
JUL RUG GCP DCT NOV DEC JRN FEB MfiR RPR MflY JUN JUL HUG SLT
rfc- Jr- * - , - t

_t
2:
^ Ll.1
CC '-•
/ -I '-
)100fl- ';,'
75 o ^
l.i
50 ~
0

STRRT LEVEL
C' PLRNNED UNITS 0 61 114 144 184 241
X RCTURL UNITS 0 40 90 152 21-t 2bO
V. RCTURL/COMtllT 0 17 37 63 '39 107








REHfiRKSi
This graph reflects the number of municipal sampling inspections performed by Region VII
staff and by the States in the Region. Region VII performed 100 inspections, 15 more than its
commitment. The States in the Region performed 158 inspections, 2 more than their total
commitments .
IA KS MO NE
COMMITMENT - "53" 4(T 36" 25
ACTUAL - 60 26 48 24
                         VII  -  10

-------
                                   FY 1976 MftNRGEMENT SUMMFiRY Khl'OIJT
                           313 HfiTE'R NPDES PERMIT ISSunNCI:  HNIJ COIII'L 1 flNCE- THIN 1C 1 PRL
                            NO. 0«I1 INSPECS OF HfiJOR MUNI  PERHI 1"II: tli-tlTi « GIRTE
             STflRT LEVEL
O PLfiNNED UNITS    0
X fiCTURL UNITS     0
'/. RCTURL/COMMIT    0
1007
729
 17
1923
1406
 33
2791
2277
 53
3751
3601
 85
4260
4566
 107
                            NO. 04M INSPECS OF HfiJOR MUNI PERMIT Tfc t ti-tPfi 4 GTRTt!
             STRRT LEVEL
O PLRNNED UNITS
X nCTURL UNITS
•'. RCTUFIL/TOHMIT
KEMfiRKS *
0
0
0

75
126
30

140
241
72
175
323
96
                                                                   231
                                                                   471
                                                                   141
                                                    335
                                                    514
       Region VII  exceeded its Of,M Inspections  commitment  of 335  by 179  with  an
       output of 514, ranking it  fourth  behind  Region III  which had an output
       of 589.   Region VII's relatively  large  output  was particularly significant
       in view of  the fact that  there  are only  4 States in the Region.
                                              VII -  11

-------
              750
                                   FY 1976 MflNflGEMENT SUIIHflRY REPORT
                           3D WRTLR NPUES PERI1IT  ISSUFINCE RND COI1PI. 1RNCE--I1IJN1CIPRL
                                NO. Of EPn (1UN1CIPRL ENFORCEMENT FICTIONS
             STflRT LEVEL
O PLRNNED UNITS   0
X fiCTURL UNITS    0
'/. RCTUflL/COIIMIT   0
129
13
             230
30
439
343
48
617
510
70
732
604
33
                                NO. OF EPR MUN1CIPRL ENFORCEMENT RCTION&
-z.
a
£-200
z cr
2 , iso
oo
lu
^ • 100
o
•z.

Oc



u

u

„. 	
	 -f- "~~ ~~~ x
^-~^^~^ 	 	 	 ^
j— **^=f=^ 1 1 1 1
JUL RUG SEP OCT NOV DEC JRN FEE! MRR RPR MfiY JUN JUL
f 	 1 	 * 	 — sfc 	 .- .... -if- - 	 4'






— 	 	



RUG






- - — <
-
-

SEP

,,
^ t-
z (~J
tr ^
_j h*
°- ^T-
J 1 0 0 |^ j:
15" ?,
' 50 -v'



             STflRT LEVEL
O PLRNNEO UNITS   0
X RCTURL UNITS    0
'/. RCTURL/COI1MIT   0
    REMfiRKSs
Z-\
41
33
47
48
44
71
53
54
94
59
55
100
60
56
      While  Region  VII did not meet any  of its  3 Municipal Enforcement  Action
      commitments,  its level of  activity  was much higher than  its nonmunicipal
      effort.   Five NOVs,   46 Administrative Orders, and 9 Referrals  to Justice
      were  issued.   The  9  Municipal Referrals were the  most of any Region, and
      about  one third of the total  nationally.
                                               VII  -  12

-------
                                     FT 1976 MHNflGEMENT SUHIII'IRY  REPORT
                        3C  IJRTER  NPIJEG  PERMIT ISSURNCE HMO  COI1PL 11'INCt  -  FEUERHL FHCH. ITIEi
                               NO- FED F'flC OPERS EXRI1INED FOR COMPL k/PERMIT PROV
             STRRT LEVEL
(!) PLRNNED UNITS    0
X RCTUflL UNITS     0
•f. flCTUHL/COMMIT    0
91
107
23
174
206
44
2-10
282
 60
349
336
82
•169
SiO
10'J
                              NO- FEO KflC OPER5 EXMMINED I;(JR COI1PL H/PERdlT PROV
             STflRT LEVEl
6 PLRNNED UNITS
X OCTURL UNITS
•t. flCTURL/COMMIT
    REHflRKS!
20
21
32
 35
 35
 40
 •II
 63
55
56
06
       Region  VII  exceeded  its  commitment  by  5%.   There  are  25 major  federal.
       facility permittees,  of  which  4 were found to be  in violation  of their
       compliance  schedules.
                                                VII

-------
                                     FY 1976 MflNRGEMENT SUMHHKY REPORT
                    4fi WRIER  PREP OF E1GG  £ NEC DECL RRRTIONS  FOR F.PfiT,  HkT PUT CONGTRUCT1UN
                              NO. r-INRL EIGS FILED W/CEQ ON  CONSTRUCTION GRflNTS
(D PLfiNNE'D UNITS
X nCTUflL UNITS
X fiCTUnL/COIIMIT
m
"J 200 -
°150-
c 100 -
z
n I
JUL RUG SEP 1 OCT N
STRRT LEVEL.
5 55 62
55 62
T 53 60




.*
d:
	 	 — - 
-------
                             Water 5 - Water Supply

                                    National

1.    Number of Water Supply Program grants awarded.                        53

2.    Amount of FY-76 program grants awarded.                               $7.5 million

3.    Number of Water Supply Program grants refused (Pennsylvania,
     Indiana, and American Samoa).                                          3

4.    Amount of FY-76 program grants reallocated.                            $482,300

5.    Number of States and territories expressed intention to assume
     primary enforcement responsibilities.                                 54

6.    Number of States and territories expressed intention not to assume
     primary enforcement responsibilities (Pennsylvania and Indiana).        2

7.    Number of States and territories assumed primary enforcement
     responsibilities as of September 30, 1976.                             0

                                   Region VII

1.    Number of Water Supply Program grants awarded.                         4

2.    Amount of FY-76 program grants awarded, including reallocated
     funds.                                                                $504,900

          a.  Iowa        $133,400
          b.  Kansas      $119,700
          d.  Missouri    $160,200
          e.  Nebraska    $ 91,600

3.    Number of States expressed intention to assume primary enforcement
     responsibilities.                                                      4

4.    Number of States assumed primary enforcement responsibilities as  of
     September 30, 1976.                                                    0
                                         VII - 15

-------
                      Water 6 - Section 208--Water Quality Management Planning

                                              National

                         Region:    I     II     III     IV     V      VI    VII    VIII   IX     X     Total

1.  Number of areawide
    designations approved
    and funded                     18     14      12     32     32     13     5     22     17    11     176

2.  Amount of funds
    obligated ($M)               $ 13.24  24.25   17.86  23.00  39.59   9.65  5.79  12.55  14.61  6.56  167.10

3.  Number of areawide
    work plans completed
    and approved                   15     11      12     26     25      95     21     10    10     144

                                             Region VII

1.  Number of areawide designations approved and funded --5

          a.   Iowa       2
          b.   Kansas     0
          c.   Missouri   3
          d.   Nebraska   0

2.  Amount of funds obligated ($M) -- $5.79M

          a.   Iowa       1.71
          b.   Kansas     0
          c.   Missouri   4.08
          d.   Nebraska   0

3.  Number of areawide work plans completed and approved --5
                                             VII  -  16

-------
                                  FV 1976 ItflNfiGEIIENT SIHIUHKY REPflRT
                                7  HflH.'R  SPJL.L PREVENTION flNU CUN1 RflL
                               NO.  SPCC PLflN CftHPL/IMPI.. INSPECT,
            STfiRT LEVEL.
CD PLHNNED UNITS  5922
X flCTUfll. UNITS   5922
7. PfCTUFlL/COI-IMIT   SO
8301
9759
 83
9762
12283
 104
11818
13289
 1 12
            2750
            UJ
                               NO.  5PCC PLON COHPL/IMPL
            STPRT LEVEI
O PLHNNED UNITS   140
X RCTUflL UNITS   HO
V. FICTUnL/COMMIT   Zb
    REIWKKSs
220
333
 51
 320
 625
 J 14
 55C
 700
 127
      Region VII completed  700 SPCC plan  and  implementation inspections as  of
      9/30/76.   This  total  exceeded its  annual  commitment  of 550  and consisted of
      140  inspections completed prior  to FY-76  and 560  inspections  completed during
      the  year.  The  Region's  FY-76 output ranks  it fifth  in the  Agency's  total
      output of 7367.  The  Region, similiar to  Regions  I,  V, and  VI, utilized
      aerial photography in assisting  field inspectors  in  the spill prevention
      program.
                                            VII -  .17

-------
                                   FY 1976 MRNRGEIIENT SUI1IK1RY  REPORT
                              MUTER  STflTE MONITORING PROORfltlE i QUflLITY fiCSURHNCE
                                  NO. OF STnTE LRBORDTORILS EVHLUflTtD
             STflRT LEVEL
O PLRNNED UNITS   0
X flCTURL UNITS    0
'/. RCTUflL/COMItlT   0
20
1 1
IS
62
72
97
                                                                               -   0
74
84
1H
                                  MO. OF STHTt l.nBORRTORIEIS LVflLlinTED
             STflRT LEVEL.
(D PLflNNED UNITS   0
X RCTUflL UNITS    0
'.I. RCTURL/COMMIT   0
    REMflRKSi
                         67
             6
             4
             67
       Region  VII was  committed to  evaluate  6  laboratories  but evaluated 4  since
       .there are only  4 central laboratories  in that  Region.   Region IV utilized
       the EPA recommended evaluation design.   Region VII  is  assisting the
       laboratories  through  follow  up on lab  development plans, advice on new
       facilities and  training.
                                             VII  - 18

-------
           co 50000
                                  FY 1976 HHNRGE.I1ENT SUIIIIfiRY KF.TUKI
                         2C  niR   - nssuRE COMPLIHNCE. WITH FUEL nuunivE REGULFITIONE
                               NO GflS SflMPLES TESTED BY FILin/l.llB HEIIIDD
            STflRT LEVEL
O PLF1NNED  UNITS   0
X nCTUflL UNITS    0
''. flCTunL/coimiT   o
5850
7492
11B17
12802
 42
18017
18723
 62
2SGOO
27900
 92
3025C
34950
 116
             5000
                               NO GRS 5RHPLEG TESTED BY  F 1LI.D/L FIB I1ETHOD
                                                                                   o <•''
            STFIRT LEVEL
X fiCTUflL  UNIT
X aCTUni/P
    REIIHRK
UNITS
NITS
011 11 IT
G i
0
0
0

SCO
553
25

1000
1003
46

                         IbOO
                         1951
                          89
                         2000
                         3041
                          130
                         2200
                         •1021
                          183
      Region  VII exceeded its  FY-76  commitment  for gas  samples  tested  to ensure
      compliance with  fuel additive  regulations.   The  Region  reported  that it  did
      not issue any  notices of contamination  as  compared to the national level  of
      0.6% of samples  tested.   The Region did'report that this  program resulted  in
      the detection  of 1,968  general  availability, nozzle, and  other'violations  of
      the fuel additive regulations.
                                             VII -  19

-------
                                   FY  1976 MHNRGEMFNT SUI1l1fiRY REPORT
                    3fl RIR   - ENSURE CONTINUED COMPLIRNCI::  WITH SIP REOUIREMENTG IN ERCH  STflTE
                              NO. IDENT PT GOURCES IN FINRL COUP H/rj-IIGfJ REDS
           o
           ft:
             20000
          2 o 15001
          t-
          o: 
-------
                                 FY 1976 MRNRGEMENT SUMMRRY REPORT
                   3fl  flIR   - ENSURE CONTINUED COMPLIRNCE WITH  SIP Kfi'KI IKEMEN T5 IN ERCH STRTIi
                        NO 1DENT PT SRC  OUT Olr COM W/FNL EM1SG REQ Mill ON  CC'O
X fiCTURL UNITG
"J i.DUU
CJ
_j o 2000
IT IO
2fe iboq.
a- tt
z m 1000
z=
3 5CO

0

_
v

	 	
• — - —

-


OCT N
GTHRT LEVEL
ITS 1396 1109
TG 1396 1605


....\£.
x— - —-—___


— •& 	
-*- 	 ___

11
JRN FEB MRR 1 RPR HH
T

811 ^59
1606 1330




	 ___)



iS — 	 	 	 i

< JUN JUL flUG SEP
^ ' 'l

234 28
1-106 122
                        NO IDENT PT SRC  OUT OF COM W/FNL  F.I1I6S REQ NUT ON  SCO
            GTRRT LEVEL
(I) PLONNED UNITS   41
X RCTURL UNITS    41
                            13
                            44
9

39
 4
24
1
19
0
30
      Region VII  did not  meet its FY-76 commitment for reducing the  number of
      point sources in violation.   In addition  to  the 30  sources in  violation  of
      final SIP  requirements, 5 sources are in  violation  of applicable  compliance
      schedules.   The 35  sources in  violation represent   2% of the known sources
      in the Region which is significantly better  than the  1\ violation level
      reported on a national basis.
                                            VII - 21

-------
                                 F'Y 1975 MflNflGENENT SUI1I1RKY Rt PORT
                   3fi RIR  - ENSURE CONTINUED COMPLIRNCE WITH CIP REQUIREMENTS IN ERCH
                               flNTICIPnTL'O NO  ENF HCTS BY EPO
                                                 5TRTL
            STRRT LEVEL
O PLflNNED UNITS    0
X nCTUflL UNITS     0
•I. flCTUflL/COMMIT    0
192
435
335
3G
642
843
790
12
1094
1091
100
                               RNTICIPflTt'D NO ENF RCTS BY EPfi
            STRRT LEVEL
O PLflNNED UNITS    0
X RCTUflL UNITS     0
'/. RCTURL/COrmiT    0
    REHfiRKG>  	
4
33
41
8
54
67
13
71
33
i7
82
101
                                                 81
                                                 33
                                                 121
       Region VII  exceeded its  FY-76 commitment for  air  enforcement actions.   The
       breakdown of  the 98 air  enforcement  actions was not fully  documented  by
       activity indicator reporting.  However,  activity  indicators  show that  the
       Region issued 4 Notices  of Violation and 81 Abatement Orders.   The States
       in  the Region also undertook a substantial number of enforcement actions.
       The number  of State actions is not documented here since each  State uses
       a slightly  different definition of what  constitutes an enforcement action.

                                           VII  -  22

-------
Air 3B
Number of States

          Delegated

            NSPS
           NESHAPS
                          Air 6 - Delegation of NSPS and NESHAPS

                                    National
        Start Level

             2
             2
Commitment

    41
    33
Actual 9/30/76

      23
      17
Number of States

          Delegated

            NSPS
           NESHAPS
                                   Region VII
        Start Level

             0
             0
Commitment

     3
     1
Actual 9/30/76

       2
       0
REMARKS:
The Region missed its commitments for delegation of NSPS and NESHAPS enforcement
authorities.  The Region was able to delegate the NSPS enforcement authority to
Iowa and Nebraska.
                                     VII - 23

-------
                            F-Y  1976 MHNHGEMENT SUMIIflRY Kt.KJRT
                RIR   - ENSURE COMPLIRNCE  OF FEDERRL FFlCH.l TIES WITH SIP REQUIREMENTS
                        NO. FED PT. SOURCES  IN COMPLIflNCE N1III SIPS
d JUU
_j £ 400
a: o
2 CJ
° -z 300
t— >-<
2 £ 200
CD
I lorf

0
<

.


-

_

1 - ~ ~=:*''


OCT N
STRRT LEVEL
O PLRNNED UNITS 118 151
X RCTURL UNITS 118 139
•'. RCTURL/COMMJT 36 43
UJ






	 — — "^
fir 	 .



JflN FEB MflR
5





	 	 — ~(
___ t5 —
^— " ^^r^~*^
.^ 	


tl
RPR I'lHY JUN JUL HUG SEP
T '

i. Li
~r
_:. 1-
~J" •''
jlOG ^ '"
cc. ~
-j * *
• -> (r t . ' •'
> ID "• j_.
U. J-'-
50 ° []
t-,*
Of
<-  NO. FED PT. SOURCES IN COI1PL.
i n
CC * *-*
t— »
G = 8
z t-)
2 2 6
o "-1
•^ uj 4
CD
z:
i 2
t
0
.

-

_


6»«
	 8$
1.
OCT N
GTRRT LEVEL
O PLRNNEO UNITS 1 1
X RCTURL UNITS 1 1
7. RCTURL/COnrilT 50 50
REMARKS i








»_ n
^^ 	 -t
1
3V DEc|jflN FEB MRR

1 1

II1NCE II ITH SIPS







— — — ~ 	 **
N XIV — — ~~
3— G —
1
RPR HRY JUN 1 JUL RUG SEP
C'J
2
z: •=
a: x:
fl . ** \
( Li- ^
0 0
*-
Rp
_ 5

1 2
1234
5G 100 150 200


Region VII has exceeded its  commitment by 100%.  All  10 of  their  federal
point  sources  are either in  compliance with  SIPs or  on a consent  declaration.
                                      VII - 24

-------
               250
            _j o 200
            cc ^
            2^150
               io
                50

                 0
                                     FY 1976 MDNHGEMENT  SUMI1RRY REPORT
                      7  RIR   -  ENSURE COtlPLIRNCE OF FEUERDL  FRC1UTILS Mill) SIP  REQUIREMENTS
                                NO. FED PT. SOURCES OUT OF COMPLIRNCt: HI1H SIPS
                                                                       e—


             STRRT LEVEL
G PLflNNED UNITS   101
X nCTURL UNITS   101



                                              JflN
                                                  FEB
                                                       MRR
                             RPK
                                                                tlflY
                                                                    JUN  JiJL
                                                                             RUG
                                                    GEP
112
12b
118
123
120
74
121
90
111
82
                               NO. f-EO PT . SOURCES OUT  OF CtWPLlflNCE WITH SIPS
             STRRT  LEVEL.
O PLRNNED UNITS    9
X flCTURL UNITS     9
    REMflRKSi
      Region VII has 6  federal  point sources  that  are out of  compliance  with  SIl's
      but  on a  consent  declaration.   Region VII has  no  federal point sources  that
      are  of unknown status.
                                               VII -  25

-------
              FY 1076 linNflGEIIENT GUMtlfiRY REPORT
1  PESTICIDES - EGTHBLISH OPERFiT IDNflL  STRTE  CERTIFICATION PROGRAMS
            NO. STflTt: SECT. A CERT  PL fiNS RPFTcOVED
o ;o
UJ '
_j g 60
n c.
2 C.
2*45
f— DC
(X liJ
^Iso
15
0C
<_

_
	 _4£ 	 <
„* — 	 — "~
.--— •" ""~~^
^^~~
^^^~ _--—-* 	 -
" — — -?^1—-*- 	 ~~*
*^^ 1 1 1 I
JUL RUG GE;P OCT NOV DEC JRN FEB MRR RPR i-inv JUN JUL RUG SLP
\r *ir ' I* 'iT l


£
•IlJfJi: ,Y,
u- 3-
75'.' '",

' ' I ' '*
25 "
0
STflRT LEVEL
RNNED UNITS 3 i2 30 43 52 52
TURL UNITS 3 4 10 15 25 30
TOOL/COMMIT 6 8 19 23 43 50
NO. CTflTE SECT. 4 CERT PLRNG fiPPKUVE.O
O 1 U
UJ
2 Q.
0 ^ g


iij Jir
^ zr 4

2:
o
(L
0
-
^_



•T^ /'h /
.„ — — v7 ~ ~ ',7 " " - — *'

— -©

11 1 1
OCT NOV DEC. JRN FEB I1RR RPR MRY JUN JJL RUG GEP
•ir J- J- ^
2 ''•
U" 3r
..J '-
fl '• '
J.
)i (JQj 1;. .U

75 -'
5C'
0
GTRRT LEVEL
RNNED UNITS 1 13444
TURL UNITS 111111
TUfiL/COtiniT 25 25 25 25 25 25
REMflRKO.'.
Region VII had 1 State plan approved for an achievement level of 25%. All
3 States are waiting EPA review of State draft plans. Region VII has the
least number of State plans approved among all Regions.
                         VII  -  26

-------
            CO
            •z.
            o
           F"Y J'JVfj HFlNHCrEIIENT SUIINHRY  REPIiKT
2R PESTICIDES.- ENSURE PROPER USE  HND F1PPI. UVfVr ION UK PESTICIDES
       NO. USE' FIND RE-ENTRY INVE'S'TIGnTHINS CONDUCTED
             STRRT LEVEL.
& PLFiNNED UNITS
X RCTUHL UNITS
''. RCTURL/COHHIT
             CO
             z
             o
     19b
     3L'b
     28
344
472
41
499
692
60
7(J1
1162
100
11S9
1399
                               NO. USE RNO RE-ENTRY INVESTIGATIONS CONDUCTED
             GTflRT LEVEL
6 PLONNED UNITS
X liCTIJflL UNIT
•/. flCTURL/COHMIT
    REMRRKS »
ITS
rs
1IT
0
0
0
20
20
24
30
30
35
45
65
76
                                            70
                                            73
                                            06
                                       85
                                       93
                                       109
       Region  VII exceeded  its commitment with  8 more  investigations than  it had
       planned for  an achievement  level  of 1091.  Only  4 Regions obtained  a higher
       percent of commitment.  This office's  inspections, including experimental
       use investigations,  resulted in  26 civil  action  warnings and 3 one  stop  sale
       orders.
                                              VII  -  27

-------
                                    FT 1976 HflNflGEMENT GUMMHRY REPORT
                     2C PESTICIDLT,  -• CUNT EFFECTIVE RECIUNfll. FOCUS ON INDUSTRY COMPL h/RF.G REQ
                                  NO. OF PRODUCER ESTHBLISHHENTS INSPEUK'U
             STRRT LEVEL.
O PLflNNED UNITS    0
X HCTUrtL UNITS     0
X HCTllflL/COMMn    0
372
535
23
83J
1145
 50
1270
1802
 79
1718
2,'.'6 4
 99
2290
2605
 117
                                                FSTFlBLISHllffNTC, INSPECTKJ
             GTHRT LEVEL
O PLI1NNED UNITG
X FICTUHL
X HCTURL/COI1I1IT
    REMflRK
HIT,
TS
111 IT
0
0
0
35
40
17
100
110
46
165
1S6
65
^00
L'26
9-1
240
251
105
         Region  VII  set a  commitment  level  of 240 inspections and surpassed  this
         by 11  inspections,  for  an achievement  rate of 105%.   The inspections
         resulted in 54 civil actions  and  6 stop sale  orders.
                                               VII  -  28

-------
1  SOLID
        F'Y
HftSTL' - DEV
  NO. CTRTt
                                        1376 HFiNRGir.HENT SUttHfiRY REt'fJin
                                       « 1MPLEI1 COMPLEtl ST 4 FED STRflT TO
                                       STROTtCItS f'OR  CON'IROL Uf U1GPOGOL
       GT GW PROGG
             GTRRT  LEVEL
O fLRNNED UNITG    0
X fiCTURL UNITG     0
"I. RCTUfiL/COMMIT    0
                14
                il
  11
                                    26
37
32
45
43
96
                              NO. STflTE STRRThCIES FOR CONTROL. OF D1SPOGHL  SITES
REG-ION 07
NUMBER OP STRRTEG
o rx) i* en ca c


T T F
JUL RUG SLP OCT NOV DEC JON FEB MHR RPR MfiY JUN JUL RUG SUP
' 	 - - -t- .... •£ 	 - 	 ..-•1'.. 	 	 •!:.._ 	 _ 	 ;
IS3CP -JO
o cr. o en o
•'. OF PLfiMNING
COMMITMENT
STRRT LEVEL
o PLR.NNED UNITS
X RL'TURL UNITS
'/. rtCTURL/COMMIT
REHfiRKS >
0
0
0

0
0
0

                                                                       3
                                                                       3
                                                                      100
                                                       ' 3
                                                        4
                                                       133
     Region  VII  exceeded its commitment by  331.   This  Region, with an achievement
     level of 1331, was the  highest among all Regions.
                                               VII  - 29

-------
                                      FY 1976 MftNHGEMENT SUI1MHRY REPORT
                       1 RRDIHTION -  SUPPORT THE  DEVELOPMENT  OF STHTt. EMERGENCY RESPONSE  PLHNS
                                  NO. OF EMERGENCY RESPONSE PLftNG COUPLE TED
                                                                                       0100
              STflRT LEVEL
O PLRNNED UNITS   11
X HCTURL UNITS    11
•/. flCTUflL/COMMIT   32
21
13
30
35
16.
47
                                                                                           o
34
21
62
10 10
•z.
OL
£o! 8
go ,
iu iu
°^ E 4
ID
2
DC
' " - ' •- ' • . J 1 1 1 . u 1 . u

-
-
-
.
	 	 	 	 <5 	
a ,,.,„« «
JUL RUG SEP OCT NOV DEC 1 JRN FEB MRR RPR I1RY JUN I JUL
f ^ -Jr






RUG





	 ^
SEP





$
              STflRT LEVEL
(D PLflNNED UNITS    G
X RCTURL UNITS     0
7. HCTURL/COMM1T    0
    REMRRKS;
                                                                                          Q.
                                                                                          fe
        Region  VII  had a  commitment of 1 but was unable  to have  any  acceptable
        plans completed.
                                                VII -  30

-------
REGION VIII

-------
        END-OF-YEAR  REPORT-- REGIONAL OVERVIEW

                                    REGION VIII

     During FY-76,  92 output  commitments were monitored through the Formal Reporting
System.  Region VIII and the States in  the  Region  met or exceeded 42 commitments,  nearly
met 10 more, and did not  meet 39.   In  addition, no commitment was made for 1 output.

     The Region obligated nearly  $47 million of its municipal construction funds
against a commitment of $80 million; the percentage achievement (58%) was well below
the national average of 84%.   For FY-77, the Region has $60 million in unobligated
P.L. 92-500 funds.   The total number of awards (195) was next to the lowest of all
Regions.  The planned award mix of 26%-46%-28% was upset with a final mix of
35%-35%-30% for Steps 1,  2, and 3 awards,  respectively.  During FY-76, Region VIII
filed 3 final EISs  with CEQ;  this is the same as the national average.

     The Region made 1 additional State program delegation, as planned,  to bring  the
total to 25; Montana assumed  responsibility for bid tabulation and review.

     Region VIII reported that 100% of the major nonmunicipal NPDES permittees in the
Region were in compliance with the compliance schedule requirements of their permits
at the end of FY-76.  This was the highest level reported by any Region.   The Region
and the States conducted  a total  of 334 reconnaissance and sampling inspections of
major nonmunicipal  permittees.  This is 76% of the total planned level and about
twice the number of major nonmunicipal permittees in the Region.  These activities
resulted in 81 NPDES enforcement  actions taken against major and minor nonmunicipal
permittees.

     Overall compliance of major  municipal permittees with the compliance schedule
requirements was reported to  be 93% in Region VIII.  This was the second highest
level reported by any Region  and  well  above the national municipal compliance level
of 82%.  The Region and the States conducted a total of 476 reconnaissance and
sampling inspections.   This was well above planned levels and about twice the number
of major municipal  permittees in  the Region.  The Region initiated a total of 30
NPDES enforcement actions against major and minor municipal permittees.
                                     VIII - i

-------
     Seventeen percent of the 12 major federal facility permits were found to be in
violation of their compliance schedules.

     The Region completed 168 O&M inspections against its annual commitment of 159
for a 106% achievement.  Region VIII awarded water supply grants to all of :j.ts 6
States amounting to $506,900.  Colorado received the largest amount, $115,400.

     In all of the Regions, no States have assumed primary enforcement
responsibilities to date; however, all of Region VIII's 6 States have expressed
intent of gaining primary enforcement responsibilities during FY-77.

     Region VIII made 22 Section 208 areawide grants, totaling $12.55 million with
the largest sums to agencies in Colorado ($4.23 million).  Of the 22 agencies, all
but 2 have been approved, and 21 of the 22 agencies have completed their project
work plans.

     The Region completed 257 SPCC plan and implementation inspections against its
FY-76 commitment of 228.  The Region evaluated 6 State water pollution laboratories,
fulfilling its commitment of 6.

     In the air media, the Region did not meet its FY-76 commitment for bringing
sources into final compliance.   Region VIII had 85% of its known sources In final
compliance with schedules at the end of FY-76, as compared to a 93% compliance level
at the end of FY-75.   The decline from FY-75 was caused by the Region failing to
update its Compliance Data System (CDS).  If CDS had been updated,  the Region
believes the compliance level would have been close to 96%.

     The Region did not meet its FY-76 commitments for field surveillance and
enforcement actions taken to ensure point source compliance.  However,  emphasis was
placed on enforcement in Air Quality Control Regions (AQCR)  which were not achieving
ambient air quality standards with 81% of enforcement actions taken in these AQCRs.

     Although the Region did not meet its commitments to delegate the NSPS and
NESHAPS programs to the States,  the Region made 6 delegations,  which ranks second
highest among the Regions.   Colorado and North Dakota were delegated both programs,
and South Dakota and Utah were delegated the NSPS program.


                                     VIII  -  ii

-------
     All of Region VIII's 14 federal point sources are either in compliance with
SIPs or on a consent declaration.  Ninety-three percent of its federal point
sources are in compliance with SIPs; this is the best percentage for any Region.

     In the pesticides programs, the commitment for use and reentry investigations
conducted was the smallest among all Regions.  However, this Region was successful
and had the highest achievement level of all Regions—139%.  Also,  experimental use
investigations and producer establishments inspected commitments were achieved with
133% and 111%, respectively.  Region VIII reported a commitment of 6 State
Section 4 Certification Plans and reported no actual approvals as of 9/30/76.
This was reported incorrectly, and at the end of the transition quarter, 2
States, Montana and Wyoming, were approved and in October, South Dakota
received its approval.  Three approved States would give Region VIII a 50%
achievement level.

     This Region's FY-76 solid waste programs have been very successful.  Region
VIII has a 100% achievement - level in the following areas:   State strategies for
control of disposal sites, State strategies for hazardous waste disposal,  federal
facilities strategies developed, and federal facilities strategies implemented.

     In the radiation program to support the development of State Emergency Response
Plans,  Region VIII  fell 2 short of reaching its commitment for an achievement level
of 67%.  This Region set a commitment of 6,  the highest of any Region,  and only
Region II had more acceptable plans completed.
                                    VIII - iii

-------
                                      FY 1976 MflNfiGEMENT SUMIIfWY REPORT
                                1  WflTER - MUNICIPflL FflCILITIES PROGRfiH tlflNflGEMENT
                                     NUMBER OF CONSTRUCTION CRflNT  RIIHROS
                    JUL   flUG  SEP  OCT  NOV  DEC  JflN   FEB  MflR  RPR  MflY  JUN  JUL
                   	S	£	S	S	S	i    g	S	S	g	S	S	
                                                              RUG
                                                          SCP
              STflRT LEVEL
X RCTUflL  UNITS
0   152  303  635  905  1178  1616 1872  2346 2669 3004  3322 3377
                                                           4649
                                     NUMDER OF CONSTRUCTION GRRNT  RHfiRDG
              GTflRT LEVEL
X flCTUflL  UNITS
14    Z2   42   S4   71   75   96   108   131  133  168
                                                                     19S
     The Region issued next  to the lowest number of  awards despite original FY-76  plans which
     called for the fourth highest commitment nationwide.   The planned mix of awards  was missed
     in favor of more Step 1 awards:  261-461-28% planned  versus 35U68)-35%(68)-30H59) actual
     for Step 1, 2, and  3 awards, respectively.  This  imbalance in mix should be corrected
     with the FY-77 planned  mix of 25%-46%-29l, which  reemphasizes the need for Step  2 awards.
                                                  VIII  -  1

-------
                                    FT 1976 MRNRGEMENT SUMHflRY. REPORT
                              1  WDTER - MUNICIPRL FFlCILITltf,  PROGRRI1 MRNRGEMENT
                             DOLLRR VfiLUE OF CONSTRUCTION GRflNT  flWHRDS  (MILLIONS)
             STflRT LEVEL
O PLRNNED UNITS    0           1088
X RCTURL UNITS     0  219  514  738 893
V. RCTUHL/COIH1IT    0   4    9    13   16
            1653          2261          4643
        1157 1652  1790 1999 2259  2413 2789 4141
         20   29  31   35   39   42   49   72
                                               573-3
                                               4809
                                                84
                             DOLLRR VHLUE OF CONSTRUCTION GRUNT RWRRDS  fMILLIONS)
             STflRT LEVEL
CD PLRNNED UNITS    0
X flCTURL UNITS .    0
•I. flCTURL/COMMIT    0
    REMRRKSi
11
8
10
23
29
24
30
30
30
38
30
38
33
41
44
34
43
35
44
36
45
68
46
58
80
47
59
     The Region missed its commitment  by achieving  only  59% of its planned level
     During  the P#st year, $47  million was  obligated, leaving  an unobligated
     balance  of $60  million.  These remaining funds exceed by  over 25% the total
     obligations made during the past  5.months.
                                              VIII  -  2

-------
                       Water 2 - State Program Delegations

                                    National
Approved NPDES Programs
Final Plans § Specs Review
Bid Tabulation Review
Change Orders Review
0§M Manual Review
Interim Inspections
Start 7/1/75

     24
     27
      2
     26
     33
      0
Commitment

    33
    41
    14
    38
    40
     7
Actual 9/50/76

      28
      37
       7
      37
      38
       2
Approved NPDES Programs
Final Plans § Specs Review
Bid Tabulation Review
Change Orders Review
0§M Manual Review
Interim Inspections
     Region VIII

Start 7/1/75

      4
      6
      2
      6
      6
      0
Commitment

     4
     6
     3
     6
     6
     0
Actual 9/30/76

       4
       6
       3
       6
       6
       0
REMARKS:

NPDES - South Dakota and Utah do not have.
Bid Tab - Montana, North Dakota, and Wyoming now have.
                                     VIII - 3

-------
                                  FY 1976 MRNRGEMENT SUhllflRY REPORT
                         3R WflTER NPDES PERMIT ISSURNCE flND COMPLIRNCE--NON-MUNICIPRL
                         X OF MflJOR NON-MUNI PERMITTEES IN COMPL IflNCE WITH SCHEDULES
                                                              	g	g
            STRRT LEVEL
O PLRNNEO UNITS   0
X flCTURL UNITS    0
77
77
  79
  82
      82
      86
               84
               87
                         7. OF MflJOR NON-MUNI PERMITTEES IN COMPLIRNCE WITH SCHEDULES
                                        -©-
                          SEP OCT
      NOV
DEC  JRN
FEB
MRR  RPR
MRY
JUN  JUL
RUG
3CP
            STRRT LEVEL
RNNED UNITS
TURL UNITS
REMflRKS:
0
0

86
94

90
98

94
99

97
99

99
100

    This graph  indicates the percentage  of major nonmunicipal permittees  reported
    to  be meeting the  compliance schedule requirements  of their  permits.   Region
    VIII reported that  100% were in compliance  at the end of FY-76.  This is well
    ahead of  the national level  of 871,  and the highest level reported  by any
    Region.
                                             VIII  -  4

-------
             CJ
             5 zsooo
           FY 1976  MflNflGEMENT SUMMflRY REPORT
3fl WflTER  NPDES  PERMIT  ISSUflNCE flND COMPL IflNCE-NONMUNICIPflL
RECON INGPECS OF MflJOR (NON-MUNI) PERMITTEES BY EPfl  4 STflTES
              STflRT LEVEL.
0 PLflNNEO UNITS
X flCTUflL  UNITS
'I. flCTUflL/COMMIT
   3145
   1788
    13
6174
3607
 25
9304
7082
 50
12391
9137
 65
14150
11301
 80
              LJ
              CJ
                            RECON  INSPECS OF MflJOR THON-MUNI) PERMITTEES BY  EPfl 4 STRTES
              STflRT LEVEL.
O PLflNNED  UNITS    0
X flCTUflL UNITS     0
7. RCTURL/COMMIT    0
    REMfiRKS:
    36
    10
     6
 66
 25
 16
 95
 42
 27
 130
 91
 59
 155
 108
 70
     This  graph reflects nonmunicipal reconnaissance inspections performed by Region VIII staff and
     by the  States in the Region.   Region VIII performed 21 inspections, well short of its conniiit=
     ment  to 31 inspectipns.   Only 1 of the 6 States in the Region  met its commitment.   The total
     of 166  inspections is  2/3 the number of major permittees in the  Region, the lowest such ratio
     among the Regions.
                                                  VIII  -  5

-------
                                      FY 1976 MflNflGEMENT SUMMRRY  REPORT
                            3fl  WRTER  NPDES PERMIT  ISSUflNCE RND  COMPLIflNCE-NONNUNICIPRL
                            SfltlPLING IN5PECS OF MRJ(NON-MUNI) PERMITTEES BY EPF) « STRTES
              STRRT LEVEL.
O PLflNNED UNITS    0
X RCTUflL UNITS     0
'i. qCTURL/COMMIT    0
914
629
 13
1850
1404
 30
2727
2450
3626
3263
 69
4716
4357
 92
                           SflMPLING INSPECS OF MflJINON-MUNI ) PERMITTEES  BY EPR 4 STRTES
              STRRT LEVEL
O PLflNNED UNITS
X flCTURL UNITS
7. HCTURL/COMMIT
REMflRKSs
0
0
0

57
44
16

115
125
44

175
128
46

205
177
63

281
226
00

     Tliis graph reflects nonmunicipal sampling inspections performed by Region VIII staff and by
     the States in the Region.  The results  of the nonmunicipal sampling inspection program are
     similar to the reconnaissance inspection program.   Region VIII committed to 116 inspections,
     but performed 101.   The States committed to  165, but missed this by 40  inspections.  As with
     nonmunicipal  reconnaissance inspections, Utah was  the only State in the Region to meet its
     commitment.
                                            CO  NTT   ND   SD   UT   WY
                               COMMITMENT  - BT  "5T   2ff   ~T   ~7   "20"
    	ACTUAL      - 44  38   11  .2   16   14	
                                                  VIII  -  6

-------
                                  FY 1976 MflNRGEMENT SUMMRRY REPORT
                         3fl WflTER NPOES PERMIT ISSUflNCE flND COMPLIfiNCE--NQN-MUNICIPRL
                              NO. OF EPR NON-MUNICIPnL  ENFORCEMENT flCTIONS
            STflRT LEVEL
O PLRNNED  UNITS   0
X flCTURL UNITS    0
'I. flCTURL/COMMIT   0
291
121
44
£.65
274
21
067
450
35
1166
623
 48
1296
764
 59
                              NO. OF EPR NON-MUNICIPRL ENFORCEMENT RCTIONL
            STRRT LEVEL
C PLflNNED  UNITS   0
X RCTUflL UNITS    0
•/. RCTUHL/C.OMMIT   o
    REMARKS*
21
18
14
51
33
30
83
57
45
140
 76
 60
127
81
64
       Region VIII did  not meet  any of  its  3 commitments  for nonmunicipal  Enforce
       ment Actions.  While only about  half of its  commitment level,  the 47
       nonmunicipal "NOVs  that were issued  to the  Region's  4  delegated States
       represent   more  than half of the  total issued nationally.  The Region
       committed  to 30 Administrative Orders and  issued 23,  and committed  to  12
       Referrals  to Justice and  initiated  11.
                                            VIII  -  7

-------
                                   FY 1976 MflNRGEMENT SUMMfiRY REPORT
                          WflTER  3B NPDES PERMIT ISSURNCE RND COMPLIRNCE--MUNICIPRL
                         '/. OF MRJOR MUNICIPRL PERMITTEES IN COMPL1RNCE N1TH SCHEDULES
             STRRT LEVEL
O PLRNNED UNITS   0
X fiCTURL UNITS    0
59
71
  65
  64
      69
      79
               73
               84
               00
               82
                           X OF MflJOR MUNI PERMITTEES IN COMPLIANCE WITH SCHEDULES
                                                    	O-
                           GEP  OCT
      NOV
DEC  JRN
FEB
MHR  RPR
                                                             MRY
JUN  JUL
                                             RUG
             STRRT LEVEL.
O PLRNNED UNITS
X fiCTURL UNITS

    REMRRKSi
74
96
  79
  91
      85
      94
               91
               98
SCP
               96
               93
     This graph  indicates the  percentage of major municipal  permittees reported to
     be  meeting  the compliance schedule requirements  of their permits.  Region VIIJ
     reported  that 931  were  in compliance at  the end  of FY-76.   This  was  the second
     highest level reported  by any Region 'and well above the national level  of 82-i.
                                             VIII  - 8

-------
                                      FY 1976 MflNflGEIIENT SUMMflRY REPORT
                             3B WRTER NPDES PERMIT ISSUflNCE RND COI1PL IRNCE-MUNICIPRL
                              RECON INSPECS  OF  MRJOR(MUNI) PERMITTEES  BY EPH 4 STOTES
              STRRT  LEVEL
CD PLRNNED  UNITS    0
X flCTUflL UNITS     0
'/. (ICTURL/COMMIT    0
1902
2274
 18
3690
6056
 47
5463
8998
 71
7290
12S29
 98
1275Z
15871
 124
                              RECON INSPECS OF  MRJORfMUNI) PERMITTEES BY EPfi 4 STRTES
              STflRT LEVEL
O PLRNNED UNITS
X RCTURL UNITS
'<: HCTURL/COMMIT
REMRRKSs
0
0
0

37
IS
10

69
34
22

97
45
29

131
111
71

156
135
87

      This graph reflects municipal reconnaissance  inspections performed by Region VIII staff and
      by the States in  the  Region.   Region VIII performed 44 inspections,  19 less than its c'ommit-
      ment.  The States conducted 91 inspections, 2 less than their total  commitment.  No State
      performed as many reconnaissance inspections  as  the number of major  municipal permittees in
      the State.
                                               CO   MT    ND   SD   UT   WY
                                COMMITMENT  - 31   T    ~9~   Iff   73   TJ
                                ACTUAL      - 19    0     1    8   27   36
                                                  VIII  - 9

-------
                                         FY  1976  MRNRGEMENT  SUMMflRY  REPORT
                               3D HflTER  NPDES PERMIT ISSURNCE RND COI1PL IRNCE-tlUNICIPRL
                              5RMPLING IN5PECS OF MRJOR(MUNI) PERMITTEES BY EPR 4 STflTt'S
               5TRRT  LEVEL
o PLRNNEO UNITS    o
X RCTUflL UNITS     0
•I. RCTUflL/COMMIT    0
822
594
 IS
1575
1884
 49
2188
2106
 S5
3051
2768
 72
3053
3923
 102
                              SRMPLING INSPECS OF MPUOR1 MUNI )  PERMITTEES BY EPR 4 CTfiTES
               STRRT  LEVEL
O PL
X RC
•/. oc




flNNED UNITS 0
TUHL UNITS 0
TUflL/COMMIT 0
REMflRKSs
This graph reflects the
staff and by the States
commitment. The States
188.



40 70 94 128 226
83 168 253 341
37 74 112 151
number of municipal sampling inspections performed by Region VIII
in the Region. Region VIII performed 39 inspections, 1 more than its
in the Region performed 302, exceeding their total commitment of

CO MT ND SD IH' WY
COMMITMENT - 118 20 11 4 12 23
ACTUAL - 243 19 4 4 20 • 12
                                                    VIII  -  10

-------
                                   FY  1976 MnNRGEMENT SUMMRRY REPORT
                          3B WflTER  NPDES PERHIT ISSURNCE RND COI1PL IflNOE-MUNIC IPflL
                            NO. 04(1 INSPECS OF' MflJOR MUNI PERrtlTTEtS-tPfl « STRTE
             STRRT LEVEL.
O PLRNNED UNITS    0
X RCTURL UNITS     0
V. RCTURL/COMMIT    0
1007
729
 17
1923
1406
 33
2791
2277
 53
3751
3601
 05
4260
4556
 107
                            NO. OtM INSPECS Of MflJOR MUNI PERMITTEES-LPF) « STflTE
            STflRT LEVEL
O PLflNNED UNIJS
X flCTUflL UNITS
'/. RCTURL/COMMIT
REMRRKS:
0
0
0

34
19
12

66
55
35

91
75
47

128
139 .
87

159
168
106

      As  of Sept.  30,  1976,  Region  VIII completed  168 OfjM Inspections,  exceeding
      its annual commitment  of 159  by 9.   Of the 168 total, 55 were completed
      during  the first half  of FY-76, 84 during the second half,  and the remain-
      ing 29  during  the transitional  period.
                                              VIII  -  11

-------
                                   FY 1976 MRNRGEMENT  SUMMRRY REPORT
                          36 WRTER NPDES PERMIT ISSUflNCE flND COMPLIRNCE--MUN1CIPRL
                                NO. OF EPfl MUNICIPflL ENFORCEMENT RCT10NS
            STRRT  LEVEL
O PLRNNED UNITS   0
X RCTURL UNITS   . 0
7. flCTUflL/CONMIT   0
144
129
18
290
222
30
439
348
48
617
510
70
732
604
83
                                NO. OF EPfl MUNICIPRL ENFORCEMENT RCT10NS
            STflRT  LEVEL
O PLflNNED  UNITS   0
X RCTURL UNITS    0
'/. flCTURL/COMMIT   0
    REMflRKS>
 6
 4
 10
 16
 9
 24
27
14
37
33
23
61
30
30
79
      Region VIII  met 2 of  its 3 commitments to Municipal  Enforcement Actions.   The
      commitment to 2 Referrals to  Justice  was met  exactly and the  12 Administrative
      Orders issued represented twice the Region's  commitment.  While short  of
      its  commitment to 30  Municipal NOVsj   the 16  issued  by the Region was  the
      third highest issuance of all Regions.
                                             VIII  -  12

-------
                                     FY  1976 HRNRGEMENT SUMMRRY REPORT
                        3C WRTER  NPOES PERMIT  ISSURNCE  RND COMPLIflNCE - FEOERRL FRCU1TIES
                              NO- FED FRC OPERS EXRMINED FOR COMPL  W/PERMIT PROV
             STfiRT LEVEL.
© PLRNNED UNITS    0
X RCTURL UNITS    0
''. RCTUflL/COMdlT    0
91
107
23
174
206
44
249
282
60
  349
  386
  82
      469
      510
      109
                              NO. FEO FflC OPER5 EXRMINEO FOR COhPL W/PERHIT  PROV
                                          OEc  JRN
                    FEB
            MflR  RPR
       MRT
I
JUN JUL
RUO
              SEP
                                                                                       76?.-

                                                                                       50 ^ £
                                                                                       25
                                                                                       0
             GTRRT LEVEL
O PLRNNED UNITS    0
X RCTUflL UNITS    0
'/. RCTURL/COMM1T    0
    REMRRKSi   	
 7
17
52
 11
 23
 70
 13
 23
 70
  19
  24
  73
       33
       46
       139
      Region VIII exceeded its  commitment by  38%.   Two  out of the  12 major  federal
      facility  permittees  were  found to  be in violation of their compliance
      schedules.
                                               VIII -  13

-------
                                    FY 1976 MflNRGEMENT SUMMRRY REPORT
                   4R HRTER  PREP OF E1SS «  NEC DECLfiRflTIONS FOR EPH'S HUT PLT  CONSTRUCTION GRTG
                              NO. FINRL EISS FILED W/CEQ ON CONSTRUCTION GRPiNTS
O PLRNNED UNITS

X RCTURL UNITS

7. RCTURL/COnniT
l/i
t— t
_i "J 200
5 u.
2° 150
t— "-
i»
2 = 100
ra
z
50[
0
T


-

_

^ 	 	 	 .Q 	
^ 	 	 _m. _ 	 	 	 ~*~~ K 	

till
JUL RUG SEP 1 OCT NOV DECjjflN FEB MRRjflPR MRY JUN 1 JUL
r •& *• *• *• .
STRRT LEVEL
TS 55 62 71 89 103
rS 55 62 63 66 73
1IT 53 60 61 64 71







_^_— ^^


RUG










	 <
	 2
-

SEP

o

•"•
a:
_i
HOOu.
C 75°
50 

.

SEP
	 j
•z
•z.
•J!.
C£
HOD s:
C 75 u.
50-,-

0
STRRT LEVEL
RNNED UNITS
TURL UNITS
TURL/COMM1T
REMRRKSi
7
7
54

7
7
54

8
7
54

12
7
54

13
7
54

13 •
10
77

      Region VIII  achieved 771  of its commitment  compared  to a national  average of
      831.  The Region  has 14  draft  EISs  filed with  CEQ,  which  is above average.
                                               VIII -  14

-------
                             Water 5 - Water Supply

                                    National

1.    Number of Water Supply Program grants awarded.                        53

2.    Amount of FY-76 program grants awarded.                               $7.5 million

3.    Number of Water Supply Program grants refused (Pennsylvania,
     Indiana, and American Samoa).                                          3

4.    Amount of FY-76 program grants reallocated.                       •     $482,300

5.    Number of States and territories expressed intention to assume
     primary enforcement responsibilities.                                 54

6.    Number of States and territories expressed intention not to assume
     primary enforcement responsibilities (Pennsylvania and Indiana).        2

7.    Number of States and territories assumed primary enforcement
     responsibilities as of September 30, 1976.                             0

                                   Region VIII

1.    Number of Water Supply Program grants awarded.                         6

2.    Amount of FY-76 program grants awarded, including reallocated
     funds.                                                                $506,900

          a.  Colorado      $115,400       d.  South Dakota  $79,100
          b.  Montana       $ 79,000       e.  Utah          $79,300
          c.  North Dakota  $ 77,100       f.  Wyoming       $77,000

3.    Number of States expressed intention to assume primary enforcement
     responsibilities.                                                      6

4.    Number of States assumed primary enforcement responsibilities as  of
     September 30, 1976.                 .                                   0
                                    VIII - 15

-------
                      Water 6 - Section 208--Water Quality Management Planning

                                              National

                         Region:    I     II     III     IV     V      VI    VII    VIII   IX     X     Total

1.  Number of areawide
    designations approved
    and funded                     18     14      12     32     32     13     5     22     17    11     176

2.  Amount of funds
    obligated ($M)               $ 13.24  24.25   17.86  23.00  39.59   9.65  5.79  12.55  14.61  6.56  167.10

3.  Number of areawide
    work plans completed
    and approved                   15     11      12     26     25      95     21     10    10     144

                                             Region VIII

1.  Number of areawide designations approved and funded --22

          a.  Colorado      6
          b.  Montana       4
          c.  North Dakota  1
          d.  South Dakota  2
          e.  Utah          6
          f.  Wyoming       3

2.  Amount of funds obligated ($M) -- $12.55M

          a.  Colorado      4.23
          b.  Montana       2.25
          c.  North Dakota  0.40
          d.  South Dakota  0.75
          e.  Utah          3.68
          f.  Wyoming       1.24

3.  Number of areawide work plans completed and approved --21
                                            VIII -  16

-------
                                  FY 1976 MRNriGEIIENT SUI1I1I:1RY REPORI
                                7  WflTER  SPILL PREVENTION f)ND CONTROL
                               NO.  SPCC PLflN COMPL/1MPL INSPEXS
            STRRT LEVEL
O PLflNNED  UNITS   5922
X RCTURL UNITS   5922
•'. ncTUfiL/contm    50
8301
9759
 83
9762
12283
11818
13289
 112
                               NO. SPCC PLflN COMPL/IMPL  IN5PECS
            STRRT LEVEL
(D PLflNNED UNITS   116
X RCTURL UNITS   116
'/. flCTURL/COnniT   51
    REMRRKSi
141
165
 72
 166
 208
 91
 228
 257
 113
      During  FY-76, including the  transitional  quarter,  Region VIII  completed 141
      SPCC plan and implementation inspections, this exceeds the  Regional  commit-
      ment and ranks  the  Region  tenth in the  total number of inspections during
      the period.  Of  the 257 completions,  74 were in Wyoming, 54 in North Dakota,
      and 22  in South  Dakota.  The apparent  little activity- in the program in
      Region  VIII stems  from the relative arrid nature  of the Region in which
      pollutants from  land spills  rarely reach  water.
                                            VIII - 17

-------
                                   FY 1976 linNflOEIIENT SUI1I1HRY REPORT
                            9  WHTt'R  STHTL MONITORING PROGRnnS» liUHI. 11 Y ClSSURflNCE
                                  NO. OF STfm; L.nBORFlTORltS
                                                                                  4jioo:
             GTRRT LEVEL
O PLANNED UNITS    0
x ncTunt UNITS   .  o
'i. nCTURL/COMIlIT    0
20
11
Ib
. 62
 12
 97
                                             i •
                                             IU
                                                                                    7S ",
                                                                                      c.
                                                                                  -  50 i'-;
14
84
114
                                   NO. OF STPITf: l.flBORHTORIEIS LVflLUfntfJ
             GTflRT LEVEL.
O PLflNNEO UNITS    0
X RCTUflL UNITS     0
'/. flCTUHL/COMMIT    0
    KEMRRKS»
                          6
                          6
                          100
 6
 6
100
       Region  VIII evaluated the  6  laboratories  it was  committed  to evaluate,
       utilizing EPA  recommended  methodology.  The Region  has instituted  a program
       of follow-up visits  to the laboratories and on-the-iob training  of State
       personnel in EPA labs.
                                              VIII
            18

-------
                                                       REPORT
                                                               KECIJlflTUJNS
            STflRT l.EVEl.
0 PLANNED UNITS    0
X OCTUflL UNITS     0
'I. nCTUIIL/COHIIlT    0
5850
7 A 92
11617
12802
 42
18017
18723
 62
2 so no
27900
 92
30250
34950
 116
             5000
                              NO OftS GHMPLES  TESTtO BY riLI.D/LHB HE 11100
            GTflRT LEVEL
C» PLHNNED UNITS
X flCTUOL UNITS
't. HCTUflL/COMMIT
REMflRKSj
0
0
0

500
659
22

1000
1616
54

I5UO
2328
78

                                                               2000
                                                               3073
                                                               102
                                                 3000
                                                 3865
                                                 12-9
     Region VIII exceeded its FY-76 commitment  for gas samples tested  to  ensure
     compliance with  fuel additive  regulations.   The Region  reported that notices
     of  contamination issued represented 1.5% of the samples tested.   This is
     somewhat higher  than the national average  of 0.6%.   In  addition to
     contamination violations,  the  Region detected 72 general availability, nozzle
     and other violations of the  fuel regulations.
                                           VIII  -  19

-------
                                  FY 1976 MRNRGEI1ENT SiJIHIfWY REPOKT
                    3fl RIR   - ENSURE CONTINUED COMPLIF1NCE HITII SIP KEHU IREI1ENTS IN EflCH STRTE
                             NO-  IDENT PT SOURCES IN FINRL COUP  W/EHIfiS REGS
            STRRT LEVEL
O PLRNNED UNITS  13920         14531
X RCTURL UNITS  13920         14839
7. fiCTUflL/COMtllT    70  '         75
                                       16984
                                         !35
                        18060
                          91
                        16976
                        1703-1
                          90
                        19831
                        18367
                          92
                             NO-  IDENT  PT SOURCES IN FINflL COUP W/EI1ISS REGS
S|GOO
| fe 4501
O Q,
K lo 300
z:
0
__^_ 	 ^ ____--<
x :
1 1 1 1
JUL RUG SEP OCT NOV DEC JRN PER I1RR RPR HfiY JUN JUL flUG SLP
r. 	 ... - -X 	 .— . — . . sr 	 	 .._•*• •> >
                                                                                    z:
                                                                                    o
            GTRRT LEVEL
O PI.HNNED UNITG   43Z
X fiCTURL UNITS   493
'>. RCTURL/COMI1IT    84
503
bOO
517
506
06
530
519
89
                                                                 473
                                                                  81
5S6
481
82
      Region VIII  did not.meet its  FY-76 commitment  for having point  sources
      come into  final compliance.   Of the  620 known  sources  in the Region, 78%
      are in final compliance and an additional 71 are in compliance  with schedules.
      This compares to a  national level of 921 of point sources in final compliance
      and in compliance with schedules.  The  primary reason  for not meeting the
      commitment was that the Region did not  update  its Compliance Data System(CDS);
      if CDS was updated,  the compliance level would be close  to 961.
                                            VIII  -  20

-------
              2000

              150

              1000

              500

                0
                                   FY l'J7S Mfl.NflfiENENT SUHUflRY REPORT
                    3R RIR  - ENSURE CONTINUED CQHPL1F1NCE WITH SIP RE OU IRF.I1F..NTS  IN EHCH STRTE.
                         NO IDENT PT SRC  OUT OF  COM W/FNL EI1ISS RHO  NOT ON  SCO


•t
                               OCT
                                   NOV
DEC.
JON
FEE!
MRR  F1PK
                                                            11 RY
                                                                JUN
JUL
RUG
            STRRT  LEVEL
O PLRNNED UNITS   1396          1109
X fiCTUFIL  UNITS   1396          1605
                                         311
                                         1606
              559
              1330
                       234
                      1-106
CEP
                               204
                               1226
                         NO IDENT PT SRC OUT OF COM W/FNL EI11SS Rt'Q NOT ON  SCO
            STflRT  LEVEL
O PLflNNED UNITS   32
X fiCTURL UNITS    32
                             25
                             70
                                         63
                                                                                OiBSJ
                                        0
                                        81
       Region VIII  did not  meet its  FY-76  commitment  for reducing  the number of
       point  sources  in violation.   In addition to  the 81  sources  in violation
       of  final SIP requirements,  7  sources  are in  violation of applicable
       compliance schedules.   The 88  sources  in violation  represent   14% of the
       known  sources  in the Region.   This  compares  to a 1\  violation level
       reported on  a  national basis.
                                            VIII  -  21

-------
                                  FY 1976 Mn.NfiGE.HENT SUMMFiRY REPORT
                   3fl flIR   - ENSURE CONTINUED COMI'LIflNCE WITH SIP REQUIREMENT!
                                fiNTlflPfiTLCI NO LNF fiCTS E1Y EPfi
                                                         IN EflCH STflTL
o PLRNNED UNITS
X fiCTURL UNITS
V. RCTURL/COHMIT
HRRT LEVEL
    0
    0
    0
192
226
21
435
395
36
             40
8-13
VOID
72
1004
1001
100
                               fiNTICIPfiTED NO E.NF RCTS BY EPfi
            STflRT LEVEL
O PLfiNNED UNITS
X RCTUfiL UNITS
'/. RCTURL/COI1I1IT
REMRRKf, :.
0
0
0

10
27
42

                                        21
                                        3i
                                        48
                                        42
                                        41
                                        63
                                     6S
                                     bi2
                                     30
                                     65
                                     53
                                     89
      Region VIII exceeded its  FY-76 commitment for  air enforcement actions.   The
      58  actions consisted of  26  Notices  of Violation,  31 Abatement Orders,  and
      the initiation  of 1 civil/criminal  proceeding.    The States in the  Region
      also undertook  a substantial number of enforcement actions.  The number of
      State actions  is not documented here since each  State uses  a slightly
      different definition of  what constitutes an enforcement  action.
                                            VIII  -  22

-------
                 Air 3B § Air 6 - Delegation of NSPS and NESHAPS

                                    National

Number of States

          Delegated      Start Level    Commitment
            NSPS
           NESHAPS
     2
     2
    41
    33
Actual 9/30/76

      23
      17
Number of States

          Delegated

            NSPS
           NESHAPS
                                   Region VIII
Start Level

     0
     0
Commitment

     6
     4
Actual 9/30/76

       4
       2
REMARKS:

Region VIII did not accomplish its FY-76 commitment for delegation of NSPS and
NESHAPS enforcement authorities.  However, the 6 delegations accomplished during
FY-76 ranked second among the Regions.  At the end of FY-76, Colorado, South
Dakota, North Dakota, and Utah had been granted delegation of the NSPS authority
In addition, Colorado and North Dakota had accepted delegation of NESHAPS
enforcement authority.
                                     VIII - 23

-------
                                      FT 1976 nflNfiREIIENT SUIIIIflKY REPI'JRT
                         RIR   - ENSURE COMPLIANCE OF FEDERHL FfiClliriLS WITH SIP REQUIREMENTS
                                  NO.  FED PT. SOURCES IN COI1PL KINCE WITH SIPS
              STRRT LEVEL.
O PLflNNED UNITS   118
X HCTURL UNITS    118
y. RCTURL/COnniT   36
1S1
139
A3
171
161
19
145
4 1
269
249
 76
326
246
 75
              ILJ
              CJ
                                  NO. FED PT .  SOURCES IN COIIPLlfltCE. WITH SIPS
(X t-O
_l
g g 20
_ o 1
2 2 15
£ £ 10
CO
i s
0


fT. 	 . 	 	 f1\ ___^_ 	 	 /
j 	 ipd 	 — — - — ft- — ~

x

-
11 1
OCT NOV DEc|jRN FEB MflR flPR MRY JUN [ JUL RUO SEP
                                                                                         50 fe
              STflRT LEVEL
O PLRNNED UNITS
X RCTURL UNITS
''. RCTURL/COnniT
REMRRKS »
17
17
89

17
17
89

17
16
84

19
12
63

                                                                        19
                                                                        13
                                                                        68
                                                       19
                                                       13
                                                       68
       Region VIII  has  14 federal  point sources  which are either  in  compliance
      . with SIPs or on  a  consent  declaration.
                                               •VIII -  24

-------
             S 2SC
             <_>
             or
             i 200
                                     FT  1976 MfiNflGEHENT SUHI1RRY REPORT
                      7  HIR   - ENSURE C.OMPL IHNCE f)F FEDERRL FRCH.ITU.S WITH SIP REQUIREMENTS
                                NCI. FED PT. SOURCES  OUT OF COMPLIANCE WITH  SIPS
               iso
            a:
                                                          -©-•
                                                          -O—
                   Jill.
               SEP I  OCT. NOV   DEC I JHN  FEH  MflR I  CIPR  HflY  JUN I Jl
                                                                              nuc
                                                                                   SEP
             STRRT LEVEL
(!) PLRNNED UNITS    101           112
X FlCTUflL UNITS    101           12S
                              110
                              123
120
'14
121
90
11 1
                10
              CJ
              a:
              rs
              o
            C3 Q,
            ^ co  '1
                                NO. FED PT. S
                                    OUT OF COHPLiriMCE WITH SIPS
                                                                                     •O
(!) PLHNNED UNITS
x ncTuni. UNITS
STflRT LEVEL

    2
    REI1HRK
      Region VIII has 1  federal point  source  that  is  out of compliance with SIPs
      but  on a  consent declaration.   Region VIII  has  no federal  point sources  that
      are  of unknown status.
                                                  VIII  -  25

-------
                                  EY  1076 I1DNRGEI1ENT GUIIHflRY REPORT
                       1 PESTICIDES  - ESTflBLISH OPERRTIONRL STRTE CE.RT If IfflT ION PROGRflMS
                                NO. STflTE SL'CT. 4  CERT PLfiNG flPPROVED
            GTflRT LEVEL.
O PLfiNNED UNITS    3
X fiCTURL UNITS    3
•/. RCTuRL/conniT    s
11

A
8
30
10
19
                         43
52
30
                                     48
                                 NO. STflTt. SECT. 4  CERT PLPNG RPPROVETJ
             LU

           C7°
           "o!
           _, a.
0
6
4

o

nr

-
-
_



rt
JLIL







RUG






.t, — —
T
SEP [ OCT





_^-

NOV




Ji
*-"
?k
DEC] JRN
— si 	







FEB



^
-&f


RPR


^




hRY

J-Ji 	
X'



jj/
JUN j ,.IIJL

	





RUG

	 1

-

-

SEP

)100
75
50

25
f n

            STRRT LEVEL.
O PLRNNED UNITS
X RCTURL UNITS
'/. RCTURL/COI1I1IT
REHfiRKS:.
0
0
0

0
0
0

O
0
0

2
0
0

6
, 0
0

6
0
0

      Region VIII committed  to  have 6  State plans  approved,  but reported no  actual
      approvals as of Sept.  30,  1976.   This was  reported  incorrectly, and  at the
      close  of the transition quarter  2 States,  Montana and  Wyoming,  were
      approved.  In  October  South Dakota received  its approval.; 3  approved States
      would  have given Region VIII a 501 achievement level.
                                            VIII  -  26

-------
                                   FY 1976 NflNflfiEMENT SUI1IK1RY KEPfilU
                           PESTICIDES  - tNSURE PROPER USE flND  HPM.1CHT10N OF  PESTICIDES
                               NO. USE FIND RE-ENTRY INVEST 10?!'!'IONS CONDUCTED
             STfiRT L.EVEl.
O PLflNNED UNITS    0
X HCTUflL UNITS     0
'I. ftCTURL/COMMIT    0
              in
              -£.
              o
195
3£5
28
344
472
                                                       •190
                                                       692
                                                       60
                                      791
                                      1 I6Z
                                      100
                                      1159
                                      139'J
                                      121
                               NO.  USE HMD  RE-ENTRY  INVEST!CUT IONS CONDUCTED
SEP  OCT
                                    NOV
           DEC  JI1N
       FEB
                                                     I1DR
                            HPR
                   I1RY
JUL
HUG
             STflRT LEVEL
0 PLFINNED UNITS    0
X flCTUUL UNITS     0
'I. HCTUflL/COMMIT    0
    REI1RRK5 i    	
15
15
39
15
17
•15
                                                       2-1
                                                       63
                                        30
                                        30
                                        79
                                        30
                                        53
                                       139
      Region VIII exceeded  its commitment with  an achievement level of  139%;  .15
      more investigations than it  had planned.   This  achievement  level  ranks  third
      among all Regions.  This office's  inspections,  including experimental use
      investigations,  resulted in  7 civil action warnings  and 1 stop sale order.
                                              VIII  - 27

-------
               5000
                                     FY 1976 imNftGEMENT SUMMFlRY RECUR I
                      2C PESTICIOE.S  - CONT EFFECTIVE RECIONflL  FOCUG ON INCUIGIRY CTJHPL  W/REC RE.Q
                                   NO. OF PRODUCER EGTflBLISHMENTS INSPECT I: U
             f.THRT LEVEL
(!) PLFINNEO UNITS    0
X flCTUflL UNITS     0
•'. nCTURL/COHMIT    0
372
535
23
831
1 145
 50
1278
1802
 79
1 7 1 8
                                          99
                                                                   2290
                                                                   2685
                                                                    117
                                   NO. OF' PRODUCER ESTHBL [ SHMENTS INGPFCHTJ
             G1HRT LEVEL
O PLfiNNED UNITS
X RCTIIfIL UNITS
'/. nCTUflL/COHIlIT
    REMRRKfn
0
0
0
              3U
              81
               25
               33
               89
               30
               41
              1 1 1
              37
              41
              11 1
        Region VIII exceeded its commitment  with  an achievement  level of 111%.
        Its  41 inspections  resulted  in  5  civil actions  and  11  stop  sale  orders
                                                VIII -  28

-------
                                     ry  1976 MFiNflGEriENT bunnnRY REPGIM
                     1  SOLID HflSTt  - DEV « II1PLEM COMI'tEll ST 4 f EO  S I'KUT TO UPGKflUE ST SW PROGS
                              NO.  STIUt STKf-iTLCIEG TOR CONTROL OF"  [J1 CI'lRHil S1TI.-.S
             STRRT LEVEL
O PLPiNNEO UNITS    0
X fiCTUfiL UNITS    0
X fiCTURL/COHMIT    0

              c.1
              3 10
                               11
                                            14
                                            il
                                            24
 41
 26
 5S
45
37
45
43
96
                              NO. STRTt: STRRTt.ClES FOR CONTROL OF  OlGPOCfiL GITE.G
             STRRT LEVEL
•o PLRNNEO UNITG    o
X FiCTUfiL UNITS    0
x fiCTufiL/conniT    o
  4
  3
 50
             ' 6
              6
             100
      Region VIII met its commitment with an achievement level  of 100%.   Only
      Region VII had a  higher  achievement level,  and  no Region  had a  higher
      number of State strategies  approved.
                                                VT 1
29

-------
                                    FY 1976 MRNRGEMEHT SUI-lMflRY REPORT
                      1  RRDIRTION - SUPPORT  THE DEVELOPMENT OF STRU EMERGENCY RESPONSE PI.DNS
                                 NO- OF EMERGENCY RESPONSE PLRNS  COMPLETED
             STflRT  LEVEL
O PLHNNED UNITS    11
X RCTURL UNITS     11
•i, flCTURL/COMMIT    32
21
13
30
35
16
47
34
21
62
                                 NO. OF EMERGENCY RESPONSE PLRNS COMPLETED
            CO
            o
1U
8

0
*

-
	 	 — — e —

JRN FEES NflR

fft -
r~~

JUL n


„- — ""
-
JO SEP
             STflRT LEVEL
O PLRNNED UNITS    Z
X flCTURL UNITS     2
.X fiCTtlflL/COIIMIT    33
    REIIRRKSi
3
2
33
 6
 2
33
 6
 4
67
       Region VIII  set  a commitment of  6,  the  highest of any  Region and  fell  2
       short  of obtaining this commitment.  There  was only 1  Region that  had  more
       acceptable  plans  completed.
                                               VIII  -  30

-------
REGION IX

-------
        END-OF-YEAR  REPORT-- REGIONAL OVERVIEW

                                      REGION  IX

     During FY-76,  92 output commitments were monitored through the Formal Reporting
System..  Region IX and the States  in  the Region met or exceeded 53 commitments,  nearly
met 13 more, and did not meet  10.   In addition, no commitments were made for 16 outputs.

     As of September 30, 1976,  Region IX obligated over $669 million of its municipal
construction funds against a commitment of $780 million.  The Region's 86% achievement
is slightly above the national  average of .84%.  Region IX made a total of 394 awards,
exceeding its initial planned  commitment.  Its number of Step 1 grants was relatively
large.  Because of that, the planned  mix of 39%-23%-38% between the Steps 1,  2,  and
3 awards,  respectively,  was not achieved with the final mix of 54%-21%-25%.  For
FY-77, the Region has $752 million in unobligated P.L. 92-500 funds, of which
California accounts for over $725  million.  Region IX has a cumulative total of  28
final and draft EISs on construction  grant projects filed with CEQ.

     Region IX increased its total State program delegations to 16, against its  FY-76
commitment of 12.  During the  fiscal  year, the Region delegated 11 additional functions
to the States.  The newly assumed  responsibilities were by Nevada for NPDES,  Hawaii
and Nevada for final plans and  specifications review, California, Hawaii, and Nevada
for bid tabulation review, Hawaii  and Nevada  for change order review and O&M manual
review, and California for interim inspections.

     Region IX reported that 86% of the major nonmunicipal NPDES permittees in the
Region were in compliance with  the compliance schedule requirements of their permits
at the end of FY-76.  This is  about the same  as the national level of 87%.  The
Region and the States conducted 268 reconnaissance and sampling inspections,  slightly
above planned levels.  The 268  inspections is slightly more than the number of
major permittees; nationally,  there were 3.4  inspections per facility.  The Region
initiated 38 NPDES enforcement  actions against major and minor nonmunicipal permittees.

     Overall compliance of major municipal permittees with the compliance schedule
• requirements of their permits  was reported to be 81%, almost the same as the national
level of 82%.  The Region and  the  States conducted 323 reconnaissance and sampling
                                       IX -  i

-------
 inspections of major municipal permittees, above planned levels and about 1.4 times
 the number of major municipal permittees in the Region.  These activities resulted
 in 50 NPDES enforcement actions against major and minor municipal permittees.  This
 exceeded the 3 commitments which were made for municipal enforcement actions.

     Region IX had the second highest number of examinations of federal facilities
 for permit compliance.  It found 14 of its 35 major federal facilities to be in
 violation of their compliance schedules.

     As of September 30, 1976, the Region awarded water supply grants to all of its
 4 States and 2 territories, totaling $870,000.  All of the above grant recipients
 intend to assume primary enforcement responsibilities.  Although American Samoa
 turned down its grant of $25,000,  it will probably assume primacy.  The largest
 grants were extended to California ($498,800) and Arizona ($116,100).

     Region IX made 17 Section 208 areawide grants, totaling $14.61 million.  The
 7 agencies in California received a total of $11.24 million, approximately 84% of
 the total.  No Section 208 grants were given to Hawaii, American Samoa,  and the
Trust Territories.  Ten of the 17 agencies have completed their project  work plans.

     The Region completed 927 SPCC plan and implementation inspections,  ranking it
third after Regions IV (7,774) and VI (987) in output.  It exceeded its  annual
commitment of 913 by 14 inspections.   Region IX evaluated 8 State water  pollution
laboratories,  1 above its commitment of 7.

     In the air media, due to a reduction of the number of point sources in the
Region,  Region IX nearly met its FY-76 commitment for bringing sources into final
compliance.   However,  the Region had 98% of its known sources  in final compliance
and in compliance with schedules at the end of FY-76,  as compared to a 92% compliance
level at the end of FY-75.

     The Region exceeded its commitments for field surveillance and enforcement
actions taken to ensure point source compliance.   Emphasis was placed  on enforcement
in Air Quality Control Regions (AQCR) which were not achieving ambient air quality
standards with all of  the enforcement actions taken in these AQCRs.
                                       IX  -  ii

-------
     Region IX did not commit to any Statewide delegations of NSPS and NESHAPS
enforcement authorities; however, the Region did delegate these authorities to
15 major local air pollution control agencies instead.

     Seventy-eight percent of Region IX's 27 federal point sources are either in
compliance with SIPs or on a consent declaration.  During FY-76, the Region reduced
its federal point sources of unknown status from 69 sources to 0 sources.

     Region IX achieved all of its highest pesticides priority outputs in FY-76
except 1.  The following programs had an achievement level of 100% or better:
use and reentry investigations conducted, experimental use investigations, producer
establishments inspected, import investigations, marketplace investigations, and
States with Applicator Certification Programs.   Of the major programs in pesticides,
only the State Section 4 Certification Plans fell below 100%; California is the only
State in Region IX that is not approved by EPA.   Furthermore, this Region completed
more than half of the total number of State registrations under Section 24c.

     Region IX's Solid Waste Program met its commitments with an achievement level
of 100%.  This Region's program in FY-76 was very successful, and only 3 Regions
had a larger commitment for State strategies for control of disposal sites.

     In the radiation program to support the development of State Emergency Response
Plans,  Region IX met its commitment by obtaining an achievement level of 100%.
                                      IX  -  iii

-------
               5000
             5 4000
                                      FY 1976  MRNRGEMENT SUMMRRT  REPORT
                                1  HflTER -  MUNICIPAL FflCIl.ITIES PROGRfltl
                                     NUMBER OF CONSTRUCTION GRRNT RHRRDS
                    JUL I  RUG I GLP I OCTJ  NOVJ DECJ JRNJ FEBJ MOR I RPR j  MHY| JUNJ JUL
                                                               RUG
SEP
              STflRT LEVEL
X flCTURL UNITS
0   152  383  635  905  1178  1616 1872 2346 2669 3004 3322  3977
 4649
              l/J
              o
              Of.
              a: r.
                SOO
                   NUMBER OF CONSTRUCTION GRflNT  RWRROS
              GTflRT LEVEL.
X RCTUfiL UNITS
    REMRRKS;
    14   47    79   105   151  170  197  213  244  260  287  316
  394
     The Region was  1  of 4 which exceeded  its  original FY-76 plans.  This  was due to additional
     awards for Steps  1 and 2 at the expense of Step 3 awards.  An  imbalance in the mix of awards
     resulted in fewer Step 3 awards in favor  of an increased number of Step 1 awards:  39%-23%-
     38% planned versus 54%(214)-21%(84)-25%(96).   Throughout the first 4  quarters of FY-76,
     Region IX met its obligation commitment of $641M.  During the  TQ  all  commitment levels for
     construction grant awards were suspended.
                                                   IX -  1

-------
                                         Ft 1976 MRNRGEMENT SUMMRRY REPORT
                                  1   WRTER  -  MUNICIPRL FflCIl.n IES PROGRflM MflNRGEIIENT
                                 DOLLRR VflLUE OF CONSTRUCTION GRUNT RWRRUS tMIl.LIONSJ
               STflRT LEVEL
O PLRNNED UNITS    0             1088
X RCTURL UNITS     0   219  514  738  893
7. RCTUflL/COntllT    0    4    9    13   16
     1653           2261           4643
1157 1652 1790 1999 2259 2413 2789 4141
 20   29   31   35   39   42   49   72
5739
4809
 84
                                 OOLLRK VflLUE OF CONSTRUCTION GRF1NT RWRRD5 {MILLIONS)
               STflRT  LEVEL
O PLflNNED UNITS 0
X RCTUflL UNITS 0
•/. RCTUflL/COnniT 0
REMRRKSi



The Region
55 88
7 11
fell 14%
108
112 155
14 20
short
247
205 247
26 32
of
its
318
288 304 341 376 447
37 39 44 48 57
goal in
oblig
year. This leaves an unobligated balance of $
amount which is more than 10% above the total
5 quarters.
California alone
has
over $
725 mi
ating
752 mi
funds
llion
641
642
82
$669 mill
llion for
obligated
remaining
780
669
86
ion for
FY-77,
"during
to be

the past
an
the past
obligated.
                                                      IX -  2

-------
                       Water 2 - State Program Delegations

                                    National
Approved NPDES Programs
Final Plans § Specs Review
Bid Tabulation Review
Change Orders Review
0§M Manual Review
Interim Inspections
Start 7/1/75

     24
     27
      2
     26
     33
      0
Commitment

    33
    41
    14
    38
    40
     7
Actual 9/30/7G

      28
      37
       7
      37
      38
       2
Approved NPDES Programs
Final Plans (j Specs Review
Bid Tabulation Review
Change Orders Review
0§M Manual Review
Interim Inspections
      Region IX

Start 7/1/75

      2
      1
      0
      1
      1
      0
Commitment

     4
     4
     2
     3
     3
     1
Actual 9/30/76

       3
       3
       3
       3
       3
       1
REMARKS:

NPDES - California, Hawaii, and Nevada now have; Arizona was planned.
Plans § Specs - California, Hawaii, and Nevada now have; Arizona was planned.
Bid Tab - California, Hawaii, and Nevada (not planned) now have.
Change Orders - California, Nevada, and Hawaii (not planned) now have; Arizona was
                planned.
0§M Manual - California, Nevada, and Hawaii (not planned) now have; Arizona was
             planned.
Interim Inspecs - California now has.
                                      IX -  3

-------
                                    FY 1976  MflNflGEMENT SUMMflRY REPORT
                          3fl WflTER NPOES PERMIT ISSUflNCE HND COI1PL IfiNCt>-NON-MUNICIPflL
                          '/. OF MflJOR  NON-MUNI  PERMITTEES IN  COMPLIflNCE WITH SCHEDULES
             STflRT LEVEL.
O PLRNNED UNITS    0
X fiCTURL UNITS     0
77
77
79
82
              82
              86
                    84
                    87
                         85
                         87
             LU
             CJ
                          '/.  OF MflJOR NON-MUNI PERMITTEES IN COMPLIANCE WITH SCHEDULES
                                                        K
                                       :3-

                                                        o —
                               OCT
                                    NOV
3
           DEC  JHN
FEB
I RPR  MRY  JUNI
               flPR
                                                                      JUL
                                                                           RUG
                                                  SEP
             STflRT LEVEL
O PLRNNED UNITS
X RCT.URL UNITS

    REMflRKSs
80
86
80
83
              80
              90
                   90
                   85
                         90
                         06
     This  graph  indicates the  percentage  of major nonmunicipal  permittees  reported
     to  be meeting the  compliance  schedule  requirements  of their permits.   Region
     IX  reported that  861 were in  compliance at  the end  of FY-76, about the same
     as  the national level of  871.
                                               IX  -  4

-------
             LJ
             O
             2 25000
           FY 1976  MflNRGEMENT SUMMRRY REPORT
3fl WRTER  NFDES PERMIT  ISSURNCE RND COtlPLIRNCE-NONMUNICIPRL
RECON INSPECS OF MRJOR (NON-MUNI) PERMITTEES BY EPfl  «  STRTES
              STRRT LEVEL
O PLflNNEO UNITE     0
X flCTUOL UNITS      0
7. fiCTURL/COMfllT     0
   3145
   1788
    13
6174
3607
9304
7032
 50
3137
 65
14153
11301
 00
                            RECON INSPECS OF MflJOR (NON-MUNI) PERMITTEES BY EPfl  4  STflTES
              STflRT LEVEL
O PLflNNED UNITS    0
X flCTUflL UNITS     0
X RCTURL/COnniT    0
    REMflRKS'
25
24
12
57
74
36
130
137
66
195
188
91
207
209
101
      This graph reflects nonmunicipal reconnaissance inspections performed by Region IX staff and
      by the States in the Region.   Region IX performed 89 inspections,  5 fewer than its commit-
      ment.  The total of 209 inspections is slightly less than the  number of major  permittees in
      the Region.
                                                    IX  -  5

-------
               i 5000
                                         FY  1976 MflNRGEMENT SUMMRRY REPORT  ,
                              3fl  WRTER   NPDES  PERMIT  ISSURNCE  RND COMF'LIRNCE-NONMUNICIPRL
                             SflMPLING INSPECS OF MRJfNON-MUNI) PERMITTEES BY  EPR  «  STflTfS
               STflRT  LEVEL.
O PLRNNED UNITS    0
X flCTUflL UNITS     0
•I. flCTURL/COnniT    0
914
629
 13
1850
1404
 30
2727
2450
 52
3626
3263
 69
4716
4357
 92
               en
               o <-
                             SRMPLING INSPECS OF MRJ(NON-MUNI) PERMITTEES BY EPR 4 STRTES
               STflRT  LEVEL
O PLRNNED UNITS 0 14 28 33
X fiCTURL UNITS 0 '20 32
7. RCTURL/COMMIT 0 38 62
REMftRKG:






This graph reflects nonmunicipal sampling inspections performed
States in the Region. The Region met exactly its commitment to
51
47
90
by
10
52
69
133
Region IX staff and by the
inspections. Four of the
States in the Region committed to 42 inspections and conducted 59.
AZ CA HI AS
CONMITMENT - ~2 24 ~~8 ~8
ACTUAL - 2 37 12 8






                                                       IX  -  6

-------
             2500
                                  FY  1976 MflNflGEMENT SUMMRRY REPORT
                        3fl WRTER NPDES PERMIT ISSURNCE RNO COMPL IRNi:E--NON-MUNICIPflL
                             'NO. OF EPR NON-MUNICIPRL ENFORCEMENT RCTIONS
            STRRT LEVEL
O PLRNNEU UNITS    0
X RCTURL UNITS    0
7. RCTURL/COMMIT    0
291
121
44
i.65
274
21
067
450
35
1166
623
 48
1296
764
 59
                              NO. OF EPfi NON-MUNICIPRL ENFORCEMENT RCTIONG
            STRRT LEVEL
O PLflNNED UNITS
X RCTURL UNITS
7. RCTURL/COMMIT
REMflRKSx
0
0
0

4
7
16

10
17
39

19
2S
57

3i
30
68

44
3 a
86

      Region  IX exceeded its commitments  to  nonmunicipal Administrative  Orders  (AO)
      and Referrals to  Justice,  and was 1  of only  2  Regions  to meet both of these
      commitments.  The shortfall  in the  above graph is solely due to  Notices of
      Violation;  12 were issued  against a  commitment of 20.   The Region  committed
      to 20 AOs and issued 21, and committed to 4  Referrals  to Justice and
      initiated 5.
                                              IX  -  7

-------
                                   FY 1976 MHNHGEMENT SUMMflRY REPORT
                           WflTER 36  NPDES PERMIT ISSUflNCE flNO*COMPLIflNCE--MUNICIPflL
                         '/. OF  MfiJOR  MUNICIPflL PERMITTEES IN COMPL.IfiNCE WITH SCHEDULES
             STflRT LEVEL
0 PLRNNEO UNITS    0
X RCTUflL UNITS     0
  59
  71
65
64
69
79
73
84
00
02
             o
             1 100
'/. OF MflJOR  MUNI PERMITTEES  IN COMPLIRNCf WITH SCHEDULES
             STflRT LEVEl
O PLflNNED UNITS
X flCTURL UNITS

    REMRRKS5
  60
  85
80
60
80
63
90
00
90
81
     This  graph  indicates the  percentage of  major municipal permittees  reported to
     be meeting  the compliance schedule requirements of  their permits.   Region  IX
     reported that 81%  were in compliance, about the same  as the  national level of
     82$.
                                               IX -  8

-------
                                         FY 1976 MRNRGEMENT SUMMRRY REPORT
                               38 WRTER  NPDES PERMIT ISSURNCE RND COIIPLIRNCE-nUNICIPRL
                               RECON  INSPECS  OF  tlflJORUIUNI )  PERMITTEES  BV  EPR  4  STflTES
               STRRT LEVEL.
O PLRNNED UNITS    0
X fiCTURL UNITS     0
'/. RCTURL/COMMIT    0
1902
2274
 18
3690
6056
 47
5463
3990
 71
7290
12529
  98
12752
15071
 124
                                RECON  INSPECS  OF  MRJORCMUNI)  PERMITTEES  BY  EPR  4  STRTES
               STRRT LEVEL
O PL
X RC
7. RC
RNNED UNITS
TUflL UNITS
TUHL/COMMIT
REMRRKS*
0
0
0
3G 81 139 191 204
39 92 134 182 242
19 45 66 09 119
This graph reflects municipal reconnaissance inspections performed by Region IX staff and by
the States in the Region. Region IX performed 61 inspections, exceeding its commitment by
6 inspections. The States in the Region performed 181 inspections, 32 more than their total
commitment. The total of 242 inspections is about 3.5 times the number of major municipal
permittees in the Region.
AZ CA III NV AS GU TT
COMMITMENT - IT 106 TT T8 ~0 ~0 ~0
ACTUAL - 15 126 20 17 0 0 3
                                                       IX  -  9

-------
                                         FY 1976 MRNRGEMENT SUMtlflRY REPORT
                               3B HRTER  NPDES PERMIT ISSUflNCE RND COMPLIRNCE-MUNICIPRL
                                       1NSPECS OF MRJORfMUNIJ PERMITTEES  BY EPR  «  STRTES
              o 5000
              UJ
              CL
            _j z 4000
            a: •-'
            z
            2 a 3000
            a: a;
                2000
                iooo
                                                   JRN
                       FEB
             MRR
               STRRT LEVEL.
O PLRNNED UNITS    0
X RCTURL UNITS     0
'< flCTURL/COMMIT    0
               3 100
822
594
 15
1575
1084
 49
2100
2106
 55
3051
2768
 72
3053
3923
 102
                              SRMPLING 1NSPECS OF MRJORf MUNI ) PERMITTEES BY EPR  f,  STRTES
               STRRT  LEVEL
O PL
X RC
'/. RC
RNNED UNITS 0
FURL UNITS 0
TURL/COMI1IT 0
REMRRKSi
28
17-
26
3i
28
42
46
54
82
This graph reflects the number of municipal
and by the States in the Region. Region IX
ment. The States in the Region performed 70
AZ CA
COMMITMEJNTT - ~T "43
ACTUAL - 2 59
61 66
64 81
97 123
sampling inspections performed by Region IX staff
performed 11 inspections, 1 more than its conimit-
inspections, 14 more than their total commitment.
HI NV AS GU TT
T ~(T ~0~ 0 ~TF
7 2 0 00
                                                      IX  -  10

-------
                                  FY 1976 MNRGEMENT GUMMftRY REPORT
                          3(3 NflTER  NPDtS PERMIT ISSUfiNCE RNL) COMPL IfiNCE-MUNICIPnL
                           NO, 0«M INSPECS OF MflJOR HUNT PERMITTt fc.S-t.Pf) f. STflTE
            GTnRT IEVEt
f.'i I'LflNNED UNITS    0
X liCTUflL UNITS    0
X nCTURL/COMHIT    0
rjcn
729
 17
1923
H06
 33
2791
2277
 53
3751
3G01
 35
-1250
•1556
 J07
                           MO. 0«H INSPEC.S OF MflJOR MUNI  PERMITTE.'E'S-tTR A STOTf
            STRRT l.EVEl
   LfiNNEU UNITS
  iCTUIiL UNITS
              0
              10
              0
              0
              Ib
              0
              0
              IK
              0
                                                                                   el;
       Although Region  IX made no  commitment for  this output  in FY-76,  it
       reported 15 Of,M  Inspections.   However, the  Region and  the States did  con-
       duct 0§M Inspections in conjunction with compliance  monitoring.   These
       inspections, however, are  counted  as compliance inspections.   In a July 9,
       1976 report, Regional personnel  indicated  that the Region forwarded to
       headquarters 160  completed  Of,M forms, of which 56 were done by Region IX
       and 114  done by  the States.
                                             IX  -  11

-------
           750
                                FY 1976 MflNflGF.MENT SUMMnRY  REPORT
                             R NPOF.S PERMIT ISSUHNCE  HMD COMPL 1HNCE--I1UNIC IPHL
                             NO, Of EPfl MUNICIPRL ENFORCEMENT FICTIONS
          GTfiRT LEVEL
 fi'-!MF.
. n:fiL
I UNITS    0
UNITE     0
         0
H4
129
13
90
                                      30
•139
3-13
4S
617
510
70
73L1
(501
33
                             MO. OF EPR MUNICIPAL EMPORCE.MF.NT nCTIONG
         GTnr?T  LEVEL
    J  UNITG
    UNITC
             •3
             zz
             51
            IB
            3i
            72
             26
             3ri
             S3
                                                                            50
                                                                            115
   Region IX met  all 3  of its Municipal  Enforcement Action commitments,  and was
   1 of Only 2 Regions  to  meet all  of its  Municipal Enforcement Acti.on commitments.
   The  25 Municipal NOVs  issued  represented more  than one  fourth  of the  national
   total  of 90 issuances.   The Region also issued 24 Administrative Orders  and
   initiated 1 Referral to Justice.
                                          IX  -  12

-------
                               FY 197B ttHNnGEHENT SUMMRRY  REPORT
                  3C HHTER  NPUES PFRH1T ISSUflNCt flND COMF1. inNCF.  - fEUERflL  FnCH.ITItS
                        NO- FED r-nc  OPCRS F.XOIIINED FOR COMPL N/PERMH PROV
        GTI1RT LEVEL
(I) r'LMMriru LI MITT,    0
X flC'''UMI  i.'MlTG     0
'>, 'ICIUML/rC'l-illl T    0
                        91
                        107
                        23
206
44
249
282
60
349
306
82
                                                                                  o
                                                                                  z
                                                                               >IOO£ E
                                                                                  fe »
                                                                                2S
                                                                                   469
                                                                                   510
                                                                                   109
         100
                        NO. r-ED r-Tic OPERS L'XHHINED FOR COHPL W/PERMIT PROV
      •;, rt
      "J Is
o PLFINNI.M.I i
X ft C TUMI. :'•!
'/. nCHlP!. .""'
    RiM';i':r;
    JNIT
             OTORT LEVEL
                 C
                 0
                 0
                                      11
                                      36
              23
              59
              07
              35
              73
              107
              60
              06
              126
Region IX  achieved  126% of its  commitment.   However,  14 of  their  35 major
federal  facility permittees were found in  violation of their compliance
schedules.   This constitutes 401 of  the major permittees in violation  which
compares  to a  national average  of 18%.
                                           IX -  13

-------
                                      FY 1976  MnNflOF.HENT f.UI1M!TRY REPORT
                     49 HHTER  PREP  OF ElSf, ft NEfi  DECI. F1RHT IONS FOR EPfVS HUT PLT  CONSTRUCTION
                                NO. FINflL F.IGG  FILED W/CEQ ON CONSTRUCTION GRflNTS
              GTRRT L.EVEl
:.'.'' i-LHMI-in.1 UNIT!
X 'if; liiiii. UNITS
•/ 1,1 11'ii1 /!'(
                 53
PZ
R;:
50
71
63
61
66
6-1
103
73
71
103
86
83
                                NO, r INRI.. F.ISG  FILED W/CEQ ON  CONSTRUCTION  GRFIN15
              GTHRT LEVEL
O ''I ri'lN: II UNITG    8
X i-i; Hill1. UNITS     8
'.'. uriljli1 /COMMIT   62
 9

69
10
9
S3
10
9
69
13
10
77
13
12
92
      Region  IX almost  achieved its  commitment.   The  12  final  EISs filed  with  CEQ
      is  921  of its commitment.   Their  16 draft  EISs  filed'with  CEQ  is the highest
      number  of any Region.
                                                   IX  -  14

-------
                             Water 5 - Water Supply

                                    National

1.    Number of Water Supply Program grants awarded.                        53

2.    Amount of FY-76 program grants awarded.                               $7.5 million

3.    Number of Water Supply Program grants refused (Pennsylvania,
     Indiana, and American Samoa).                                          3

4.    Amount of FY-76 program grants reallocated.                           $482,300

5.    Number of States and territories expressed intention to assume
     primary enforcement responsibilities.                                 54

6.    Number of States and territories expressed intention not to assume
     primary enforcement responsibilities (Pennsylvania and Indiana).        2

7.    Number of States and territories assumed primary enforcement
     responsibilities as of September 30, 1976.                             0

                                    Region IX

1.    Number of Water Supply Program grants awarded.                         6

2.    Amount of FY-76 program grants awarded, including reallocated
     funds.                                                                $870,000

          a.  Arizona     $116,100      e.  American Samoa   (refused grant
          b.  California  $498,800                            of $25,000)
          c.  Hawaii      $ 76,600      f.  Guam             $25,100
          d.  Nevada      $ 78,000      g.  Trust Territory  $75,400

3.    Number of States and territories expressed intention to assume
     primary enforcement responsibilities.  (Although American Samoa
     refused the grant, it will probably apply for primary enforcement
     responsibilities.)                                                     7

4.    Number of States assumed primary enforcement responsibilities as of
     September 30, 1976.                                                    0
                                          /

                                      IX -% 15

-------
                      Water 6 - Section 208--Water Quality Management Planning

                                              National

                         Region:    I     II     III     IV     V      VI    VII    VIII   IX     X     Total

1.  Number of areawide
    designations approved
    and funded                     18     14      12     32     32     13     5     22     17    11     176

2.  Amount of funds
    obligated ($M)               $ 13.24  24.25   17.86  23.00  39.59   9.65  5.79  12.55  14.61  6.56  167.10

3.  Number of areawide
    work plans completed
    and approved                   15     11      12     26     25      95     21     10    10     144

                                              Region IX

1.  Number of areawide designations approved and funded -- 17

          a.  Arizona             6
          b.  California          7
          c.  Guam                1
          d.  Hawaii              0
          e.  Nevada              3
          f.  American Samoa      0
          g.  Trust Territories   0

2.  Amount of funds obligated ($M) — $14.61M

          a.  Arizona             1.79
          b.  California         11.24
          c.  Guam                0.29
          d.  Hawaii              0
          e.  Nevada              1.29
          f.  American Samoa      0
          g.  Trust Territories   0

3.  Number of areawide work plans completed and approved --10
                                             IX - 16

-------
    2500Q
                              FY  1976  MflNFlGEMENl  SUtlMRRY REPORT
                            7  WRTER   SP.UL  PREVENTION FIND CONTROL.
                           NO. SPFJC PLflN COMPL/IMPL  IN5PECS
o u.
i-« o
    20000-
              15000-
    10000-
     500
f|..f-INNED UNITS
MCTUflL UNITS
    STRRT I.EVEI
       5922
         o
8301
9759
 83
9762
12283
 104
11818
13289
 112
                           NO. 5PCC PLRN
                                                     INSPEC5
    STORT LEVEL
..rj pl.
>: nc
v: nr
FINNED UNITS 89 135 ' 239
FURL UNITS 89 842 889
TUflL/COMMIT 10 , 92 97
REMqRKSs
913
927
102
As o£ Sept. 30, 1976, Region \\ completed 927 SPCC plan and implementation
inspections, of which 89 were carryovers from previous years and 838 were
completed during FY-76 including the transitional quarter. Region IX ranked
third in the FY-76 output. Region IX completed most of these inspections
through a contract arrangement with the Division of Oil and Gas in the
California State government. The Regional program emphasis was placed on
inventory and compliance in oil production areas within the Region.
                                           IX -  17

-------
              100
           !i as
           •*- zz
                                  F'Y 1976 MflNRREflENT  SUMflflRY REPORT
                          9  WHIRR  STRTE MONITORING PROGROUG s flURLITY RSGURRNCE
                                 NO. OF STflTE L.nBORPTORILS EVflLUflTED
            STRRT t.EVEl.
•ri '1 HNNEO UNITS    0
•-: ni. nmi. UNITS     o
••. ncTijni./connIT    o
zo
11
15
6Z
72
97
74
84
114
                                 NO. OF STFUE: LnBORnroRits
            STRRT LEVEL
  r!.HNNErj UNITS    0
  rr il.mi. UNITS     0
  lie iunL/ccmniT    o
0
1
14
5
b
71
7
0
114
       Region IX  was committed to evaluate  7  laboratories and evaluated 8.
       Evaluation methodology was based on  Region IX's  own evaluation design
       (utilizing EPA forms).  Region IX is attempting  to assist  the States  in
       upgrading  quality  assurance  through  106  State Program grant funds,  developing
       State laboratory self evaluation programs, instituting State lab development
       plans and  developing  lab certification plans.
                                             IX - 18

-------
           co 50000
                                  FY 1976 MflNflGEtlENT SUMI1FIRY REPORT
                         2C ttlR   - USSURE COMPLinNCE WITH FUEL WJDITIVE REGULRTIONS
                               NO GHS GflHPLES  TESTED  BY FILLD/LflB METHOD
            GTflRT LEVEL
        UNITS
  i.XTUFlL  UNITS
SflSO
7/192
 25
11617
12SQ2
16017
18723
 62
2bOOO'
Z7900
 92
302SO
                                                                             116
                               NO  ORS SRHPLES  TESTED BY FIEI.D/LRB METHOD
            GTRRT LEVEL
•'• ' LiTINED UNITS   - 0
y. '«•: ii.MiL UNITS    o
V ;i'"l Iliil...'COMMIT    0
 700
 .('.16
 12
1000
1650
39
2700
2779
65
4000
4421
103
4300
5006
116
I      Region  IX exceeded its FY-76 commitment for  gas samples  tested  to ensure
      compliance with  fuel additive regulations and ranked  second among the Regions
      in  terms of the  total number of gas  samples  tested.   The Region reported
      that  notices of  contamination issued represented 0.5%  of the samples tested.
      This  compares  to the national average of 0.6%.   In addition to  contamination
      violations, the  Region detected 249  general  availability,  nozzle, and other
      violations of  the  fuel regulations.

                                             IX - 19

-------
                 FY  1975 HflNRGEMENT SUMMflRY REPORT
3fl f)IR   - ENSURE CONTINUED COMPLIR.NCE WITH SIP REQUIREMENTS IN ERCH STflTE
           NO,  IDENT PT SOURCES  IN FINRL COM"  H/EHIGG REGS
"J i- Z>UUU
D
(£
_j o 20000
cc to
z
S fe isootj
a: £t
z In 10000
^
^ 5COO
0
*
£.




- 	 j^



-
I
JUL PUJG .&E.PJ_ OCT N

GTRRT LEVEL
flHNF.fJ UNITG . 13920 M53i
HJfiL UNITS 13920 ME3;)
II'fIL /COMMIT 70 ' 75




	 W — 	 	





JRN F


1.S418
16934
35










fiPR M


IS9S9
13G60
91


	 ^
** ~* ' **" '
_ — *—•

-

-

JUL RUG GET
<-* 	 	 	 ;


H002 ,_

* £
75 aj £
n.' -:
50 u. =
(^ "
zs "'
0

16976 193S1
17924 18357
90 92
o nr.,.n N0 I[JC.NT PT SOURCES IN FINFU. COUP W/EMISG REGS
L.)
Qi
H? o 2000
0 in j

§ o 1SOO
ci> Q.-
<* S 1000
31
*7)
Z 500
0
^




^"-'-. ^^ 	
"^ -^Q ' 	

.


-

OCT N
*• '~v
GTRRT LEVEL
ri''INE.n UNITS 1311 1411
lUfil. UNITS 1811 1893
1 l.lfil /COMMIT 85 09
!-:P. i-i f;n KG 5

•^ . 	 —



	 e 	






JRN F
*-*•

1492
209^
98


— . 	 w 	
> ^


	 e- — "






RPR M
'-*•

1451
2049
95


^-\


-**~*'^
~~ .

-


-
I-
JUL RUG SEP
	 	 	 5

)100o
C z
^ l_l 1—
•z '•*
75 § =
a. '-;
50 L £
6 f-"1
CJ
2S^
0

1.6S7 2137
19liO 1999
91 94

Region IX nearly met its FY-76 commitment for having point sources come
into final compliance. Of the 2,177
known sources in the Region, 92%
are in final compliance and an additional 61 are
in compliance with
schedules. The combined 981 compliance level compares favorably to the
national level of 92%. Region IX and
level among all Regions.

Region X have the highest compliance


                               IX -  20

-------
                              •  f'Y 1976 MRNRGEMENT SUNMHRY REPORT
                  3R flIR   - ENSURE CONTINUED COI1PLIRNCE WITH GIP REQUIREMENTS IN ERCH  STRTE
                       NO  IDENT PT SRC OUT OF COM W/FNL EMIGS REQ NOT ON SCO
           STRRT LEVEL.
''Lfi'JMF.U UNITS  1395
'','. lUfil. UNITS   1396
            1)03
            160!:;
            811
            1606
            559
            1330
            284
            MOB
            284
            1226
                       NO IDENT  PT GRC OUT Of-' COM W/FNL  EI1IGS REQ NOT ON SCO
           STRRT LEVEL.
     0 UNITS
      UNITS
73
73
6-5
12
64
67
64
31
30
44
30
45
     Region  IX did not  meet its  FY-76 commitment  for reducing the number of
     point sources in violation.   In addition to  the 45 sources in  violation  of
     final SIP requirements, 11  sources  are in violation of applicable compliance
     schedules.   The 46 sources  in violation represent  2%  of the known sources
     in the  Region which is significantly  better  than the  7% violation level
     reported  on a national basis.
                                           IX -  21

-------
                                  FY 1976 MflNnGEMENT SUMMfiRY REPORT
                    3fl RIR   - ENOURE CONTINUED COMPLIANCE WITH SIP REQUIREMENTS IN EflCII STRTt;
                                nNTICII'flTED NO E'NF F)CTS PY EPfl
            5TRRT LEVEL.
i.r) "I fi'lNCn  UNITS   0
X r,r iijfii. UNITS    0
'I. (irn.'fii./COM.MIT   0
19?
225
• 21
43
            843
            790
36
            1034
            1091
            100
                                fiMTinrflTtD NO E'NF RCTS CY EPR
                                                                                   Cl)
            GTRRT LEVEL
','.! I" I I :•'!!•! I.
X 'iCHini.
''. f\''. I I Mil
a UNITS   o
 UNITS    0
.•T'JMl" IT   0
 0
 10
 0
 19
 49
 0
33
S3
 0
41
103
40
43
109
      Region IX exceeded its  FY-76 commitment  for air  enforcement actions.   The
      43 actions consisted  of 22 Notices of Violation,  19 Abatement Orders, and
      the  initiation  of 2 civil/criminal proceedings.   The States in the  Region
      also  undertook  a substantial number of enforcement actions.  The  number of
      State actions  is not  documented  here since each  State uses  a slightly
      different definition  of what constitutes  an enforcement  action.
                                             IX  -  22

-------
                 Air 3B § Air 6 - Delegation of NSPS and NESHAPS

                                    National

Number of States

          Delegated      Start Level    Commitment     Actual 9/50/76

            NSPS              2             41               23
           NESHAPS            2             33               17


                                    Region IX

Number of States

          Delegated      Start Level    Commitment     Actual 9/30/76

            NSPS              00                0
           NESHAPS            00                0
REMARKS
Although Region IX did not plan for or have any Statewide delegations of NSPS and
NESHAPS enforcement authorities, the Region has an active delegation program.  At
the end of FY-76, the Region had delegated these authorities to 16 local air
pollution control agencies.  Of these, 15 are in California, and the remaining 1
is Pima County, Arizona.
                                       IX  -  23

-------
  UJ
  o
    500
_j If 400
en o
"Z CJ
2 z 300
or
^ Q: Tin
  iu <-UU
  ID
  ZL
  73
                 n 1976 MRNDGEMENT SUMMRRY  REPORT
7  RIR   - ENSURE  COMPLIRNCE  OF  FEDERRL FRCItlTIES WITH SIP
             NO-  FED PT.  SOURCES IN COMPLIRNCE  WITH SIPS


  STRRT LEVEL.
I OCT   NOV   DEC| JRN
                        OCT
                                            FEB
MRR I RPR  MRY  JUN I JIJI.
                                                                           RUG
                                                                    SEP
                                                                            ;?.
                                                                            *~4
                                                                        >ioof.


                                                                            u.
                                                                          50°
                                                                            Jv-
                                                                          25

                                                                           0
                     liil
                     139
                     -13
                         171
                         161
                         •19
                             221
                             145
                 269
                 249
                  76
326
246
 75
                        NO- TED  PT .  SOURCES IN COHPLIRNCE WITH SIPS
  STRRT LEVEL
ii'-n-iru UNITS 5 10 "0 30
H'Cil. UNITS 5 5 '11 14
I'Mii. .'COMI1IT 11 11 24 31
45 45
15 15
33 33
Region IX has only made a third of its commitment. However, 78% of its
27 federal point sources are either in compliance with SIPs or on a consent
declaration which is above the Regional average. The Region reported that
as a result of more accurate information obtained prior to the end of FY-76,
it reevaluated its original goal and derived a more accurate, but lower
commitment level.
                                           IX  -  24

-------
                                  FT 1976 MHNn&ENENT suiiiinRr REPORT
                    7  RIR  - ENSURE COHPI. IONCE OK FEDERAL FF1CH.ITIES WITH SIP REQUIREMENTS
                             NO. F'FU PT .  SOURCES OUT OF COHPLinNCE WITH 51 PS
            STRRT LEVEL
fj) H, fl'-iNPO UNITS   101
x i if riiisi LIMITS    101
112
                                    118
                                    123
120
74
121
90
111
32
                            NO, FEU PT . SOURCES OUT OF COHPLIRNCE WITH SIPS
            STf)RT LEVEL
>'-!M!T! LIMITS
                                        id
                                        21
                         20
                         8
                                                             10
                         20
                         12
     Torty-four percent  of Region  IX's federal  point sources are out  of compliance
     with SIPs.  Six out of the  12  sources out  of compliance are on a consent
     declaration.  One  federal point source  is  in violation of its consent
     declaration.  None  of the Region's federal point sources are of  unknown
     status.   The Region reported  that as a  result of more  accurate information
     obtained  prior to  the end of  FY-76, it  reevaluated  its original  goal and
     derived a more accurate, but  lower commitment level.

                                             IX -  25

-------
             FY  1976 MRNflGEMENT SUHMfW  REPORT
1  PESTICIDES -  fJSTflBLISH OPERATIONAL STRTL CERT IF ICOTION PROGRflUS
            MM.  STPTE  SECT,  4  CERT PLflNS  nPPROVED
o ly
LU
^§50
CC Q_
Z 0..
Scr 45
(-• Q^
u: uj
2 £30
:D
•5?
is
p
0'
T
STRRT

.
	 -9 	 <
— © -~~
-~— *"" "^^"^
^-©— "" 	 	 	 —3
--*" ^ 	 ^~
" ^ — -^^-—*— 	 ^-^^"^
^ T 1 1 1
JUL RUG C[.P| OCT MOV DEc| JRN TEB MFIR| O^R MflY JUNJ JUL HUG GET

f.'i
2 i-
'ioo p S

7a 5" •-•
3_
: r u. K
J tJ LJ
>.'
ZEi
0
LEVEL
•.:» "1 r.MN! i] UNITS 3 12 30 43 52 52
X 'if li!|.[ UNITS 3 -1 10 15 25 30
•/ r.' n.!r,! /rniiiiiT s ? 19 29 40 50
NO. STRTE SECT. 4 CERT PLF1NS RPFROVED
O J U
IU
sf 3
d
z a:
o & g
Sg
Q-' °? ,l
.O
z
£.

0!
t

-

.

CT 	 	 	 ^
^—^^^ 	 -^
u *^~-^'*: 	
^^, — "^"^
n i* frr^^ \ 1
r r
JUL RUG GEP fiCT NHV DET. JRN FEB MRf? Rr>R nqy JUN JUL RUG SEP
Y 4- dr * * T

CD
5 »-
z z
3- UJ
*K
_J •-
a- 1
)iOOu. ^
0 °
: 75 ^. °
50'"'
25
0
GTRRT LEVEL
c; r' 'TM-iFn UN no o o o 3 4 - 4
X 
-------
            If)
            z
            o
              2500
           I r  1976 MflNRGEMENT SUMI-HIRY REPORT
2fl  PESTICIDES -  ENSURE PROPER USE RND  RPPLICRTION OF PESTICIDES
       NO. usr:  RND RE-ENTRY  INVESTIGATIONS CONDUCTED
             STRRT LEVEL.
       M UNITS
        i IN ITS
       /COMMIT
            CO
            z
            o
     195
     325
     28
344
472
41
499
692
60
791
1162
100
                                                                       1399
                                                                        121
            
-------
              5000
                                    FY 1976  MRNrUJEMENT SUI1HIW RETORT
                     2C PESTICIDE f, - CONT EFFECTIVE REDIONflL FOCUS ON INDUSTRY CONPL  W/REO REO
                                  NO. OF PRODUCER ESTABLISHMENTS INSPECTED
             S10RT  LEVEL
:V '•Lfi'-'NF.n UNITS    0
X ii". limi. UNITS     0
:• <•: Ullil./COMMIT    0
372
SIS
831
1145
 50
             1278
             1802
              79
             1710
             2264
              99
             2(535
              1 17
                                  Ml). OF PRODUCER ESTflBLIGHMENTS  INSPECTED
                  LEVEL
   .ii'lMCU UNITS
    II.MIL UMITG
•15
61
116
-16
145
177
71
200
210
 04
                                         °EJO
                                         261
                                         104
    !•:!"!'! IRI'G :
         Consistent with most Regions,  Region IX  exceeded  its commitment and
         conducted 11  more  inspections  than  it had planned,  for  an achievement
         level of  104%.   These inspections resulted in  28  civil  actions and  5
         stop orders.
    L	
                                                IX - 28

-------
              CO
              UJ
                FY 1976 MflNflGEtlENT  SUimflRY REPORT
1  SOLID NRSTE - DEV (.  IMPLErt COMPLEtt ST «.  FED STRRT TO UPGRPDE ST SH PROGS
         NO. STflTE STRATEGIES FOR CONTROL. OF DlGPOSflL SITES
             STflRT LEVEL.
O PLflNNED UNITS    0
X flCTUPL UNITS     0
'I. flCTURL/COMMIT    0
         11
14
11
24
                                    41
                                    26
45
37
32
45
43
96
                              NO.  STRTE. STRRTEGIEG FOR CONTROL OP DISPOSRL SITES
CD JU
UJ
si 8
2 u_ 6
°^ £ 4
CD
z;
i 2
05
«

11
OCT NOV DEcJ JflN F
_ 	 © 	 G-— . 	 	

11
RPR MRY JUN JUL RUG SEP
7T 1
O
5 i-
— • UJ
15 •-
TI- ti- 2f
' J O V
50 -x- ^
25
0
             STRRT  LEVEL
O PLflNNED UNITS
Y. HCTUHL UNITS
'(. RCTURL/COHniT
REMflRKS:
0
0
0

5
5
100

5
5
100

6
5
100

6
5
100

5
5
100

     Region  IX met its  commitment  with  an achievement  level  of 100%.   There  were
     3  Regions that had 6 approved State strategies, 1  more  than  Region IX.
                                                IX  -  29

-------
                            rr  1976 MnNRGEMENT SUMMRRY RETORT
              1 RflDIRTION  - PURPORT THE DEVELOPMENT OF STRTE EMERGENCY RESPONSE  PLRNS
                         NO-  Of EMERGENCY RESPONSE PLflNS COMPLETED
co ou
of
_i o! 40
a:
3T. U.
5° 30
CX UJ
z l°c
0
i
GTRRT
^__ 	 - -e 	 <
-^ 	 	 	 !
11
JRN PER MDR RPR MRY JUN JUL RUG SEP
7T T
LEVEL
o
Ci *~
cc zi
c 75 *" i
SO « o
2S'
0
.
C) PLIWim UNITS 11 21 35 34
x nciiH,'. jjni rs 11 13 16 21
't. n ;iH''.|. ••' OI-'HIT 32 30 47 62
03 10
en — o
— Ll_
2° 6
tK jl .}
^
2t
0
T
£.
GTRRT
NO, OF EMERGENCY RESPONSE PLRNS COMPLETED
_
-

11
JflN FEB MRR RPR MflY JUN JUL flUO GCIP
..... i*" ~\
.EVEL
5 H-
1 UJ
5?
u_ ^
°s
nop^'
O rUl'lllf.M LlMITfi 2 2 32
X HCUli,:1. lltlllS 2 2 2 '2
v. n:; i !.!i>! /'.'fiMi-iiT 100 100 100 100
Region IX obtained  its commitment with a 100% achievement  level.   Only 1
Region had a  higher  achievement level than  Region  IX.
                                        IX - 30

-------
REGION X

-------
        END-OF-YEAR  REPORT-- REGIONAL OVERVIEW

                                     REGION X

     During FY-76,  92  output commitments were monitored through  the  Formal  Reporting
System.   Region X and  the  States in the Region met or exceeded 66  commitments, nearly
met 8 more, and did not  meet 15.  In addition, no commitments  were made  for 3 outputs.

     The Region obligated  over $123 million of its municipal construction funds
against  a commitment of  $157 million; the percentage achieved  (79%)  was  below the
national average of 84%.   For FY-77, the Region has $124 million in  unobligated
P.L. 92-500 funds.   The  total awards (352) exceeded the initial  plans, but  the large
number of Step 1 awards  upset the planned mix of 41%-32%-27%,  with a final  mix of
57%-22%-21% for Steps  1, 2, and 3 awards.  Region X filed 8 final  EISs on construction
grants with CEQ during FY-76.

     The Region made 2 additional State program delegations, raising its total to 13.
Alaska received delegation of plans and specifications review  and  change order review.

     Region X reported that 91% of the major nonmunicipal NPDES  permittees  in the
Region were in compliance  with the compliance schedule requirements  of their permits
at the end of FY-76.   This is slightly above the national level  of 87%.  The Region
and the  States conducted 385 reconnaissance and sampling inspections, somewhat above
planned levels and about 3.5 times the number of major nonmunicipal  permittees in the
Region.   These efforts resulted in 70 NPDES enforcement actions  against  major and
minor nonmunicipal permittees, slightly above planned levels in  total.

     Overall compliance  of major municipal permittees with the compliance schedule
requirements of their  permits was reported to be 92%, well above the national level
of 82%.   The Region and  the States performed 672 reconnaissance  and  sampling
inspections, well above  planned levels and more than 4 times the number  of  major
municipal permittees in  the Region.  These efforts resulted in 46  NPDES  enforcement
actions  against major  and  minor municipal permittees, slightly above planned levels.
In addition, no violations of compliance schedules were found  in the Region's 3
major federal facilities permittees.
                                       X  -  i

-------
     During FY-76, Region X completed 52 O&M inspections against its commitment of
36.  The Region awarded water supply grants totaling $573,500 to all of its 4 States,
and 3 States are expected to assume primacy during FY-77.

     Region X approved 11 Section 208 areawide agencies and awarded grants totaling
$6.36 million.  ten of the 11 were grants made in FY-75.  The Municipality of
Anchorage was approved late in FY-76, and its work plan had not been completed by
the end of the fiscal year.

     Region X completed 468 SPCC plan and implementation inspections against its
commitment of 362.  It evaluated 4 State water pollution laboratories, achieving
its commitment.

     In the air media, Region X nearly met its FY-76 commitment for bringing
sources into final compliance.   The Region had 98% of its known sources in final
compliance and in compliance with schedules at the end of FY-76, as compared to an
81% compliance level at the end of FY-75.  In addition,  96% of its 24 federal point
sources are either in compliance with SIPs or on a consent declaration.

     The Region exceeded its commitments for field surveillance and enforcement
actions taken to ensure point source compliance.   Region X was the only Region to
meet its FY-76 commitment for delegations of the NSPS and NESIIAPS programs.  The
States cif Washington and Oregon were granted delegation of both programs,  whereas
Idaho received delegation of the NSPS program.

     The Region accomplished its commitments in 9 of the 11 pesticides output areas.
Accomplishing its commitments for marketplace,  producer establishments, and import
investigations resulted in the Region undertaking 10 civil actions.

     Region X in FY-76 met its commitment in all solid waste output areas.
                                       X  -  ii

-------
             in
             o
             Of.

             3 SOOO
             IX
                                  FY 1976 MQNnGEMENT SUMMflRY REPORT
                           1  WfiTt.1?  -  nUNICIPflL FACILITIES PROGRAM MflNfiGEMENT
                                 NUHBER OF CONSTRUCTION GRflNT RWRRDS
         GTRRT LEVEL
X 'iniiri!.  UNITS     0   IbZ  3'33  535  90S  1178  1616 1872 2346 2669  3004 3322 3Q77
                                                                                   4649
         tn
         a

         §500
         a:
       2 5 400

       2^300
       o ^
       o; z 200


         o 100
             0)
                                      NUMBER Or' CONSTRUCTION GRRNT IIWORUS
                        I SL'P I  OCTJ NOV I DEC I JRN I  FEB |  IWR I RPR! MOY I  JUN I  JUL
                    JUL  RUG
                                                                                  RUG
5EP
         GTRRT LEVEL
X •'.:: lil'il.  UMITG     0    10   29   S2   80   94   123  162   190  221  24'J  271   3i5
                                                                                    352
The Region was 1 of 4 which exceeded its  original FY-7C plans.   This was due  to additional
Step 1  awards being made  which resulted in  an imbalance of  the  planned mix primarily for
Step 2  awards:  411-325-27% planned versus  575o(201)-22l(77)-2lU74) actual for Step 1, 2,
and 3 awards, respectively.  Hie FY-77 planned mix, 15^-441-41%, should correct the
imbalance  with increased  emphasis on Step 2 and 3 awards.
                                               X -  1

-------
                              r Y 1976 MHNflGEIIENT SUMHRRY REPORT
                        1  HIITI-JR  - MUNICIPHI. FACILITIES PROORntl
                       OOLlflR vnLUE OF CONSTRUCTION GRflNT nwOROG  fMU.LIONS)
                                                                                  o
       STflRT LEVEL.
 rj UNi TO
 UNITS
0           1000           1653          2261          4643
0   219  514   733  S13  11S7  165Z 1790  1999 Z2S9 2413 2789 4141
049   13   i5   20   29   31   35   39   42   49   72
                                                     5730
                                                     4809
                                                      84
                           ^ VIII.UE OK CONSTRUCTION ORFINT nwni?fjs  (MILLIONS)
      STORT LEVEL
:T; n. NHHE
x MI: rum.
''. i-c. run i.
 D UNITS
 UNITS
 /COMim
        25
        16
49
40
2h.
43
Zl
46
29
57
56
36
61
39
71
45
75
00
5i
         120
92  96   114
59  61   73
157
123
78
The  Region obligated $123 million,  but  fell  22% short of its  goal,  leaving
an unobligated balance of $124  million  to be  obligated  in FY-77.   This  amount
is the same as the  total  funds  for  the  past  5 quarters.
                                             X  -  2

-------
                       Water 2 - State Program Delegations

                                    National
Approved NPDES Programs
Final Plans § Specs Review
Bid Tabulation Review
Change Orders Review
Of,M Manual Review
Interim Inspections
Start 7/1/75

     24
     27
      2
     26
     33
      0
Commitment

    33
    41
    14
    38
    40
     7
Actual 9/30/76

      28
      37
       7
      37
      38
       2
Approved NPDES Programs
Final Plans fi Specs Review
Bid Tabulation Review
Change Orders Review
0?,M Manual Review
Interim Inspections
      Region X

Start 7/1/75

      2
      3
      0
      3
      3
      0
Commitment

     2
     4
     0
     4
     3
     1
Actual 9/50/76

       2
       4
       0
       4
       3
       0
REMARKS:

NPUES - Oregon and Washington now have.
OfiM Manual - Only Alaska does not have.
Interim Inspecs - Washington was planned.
                                       X - 3

-------
                                    FY 1976 MRNRGEMENT SUMF1RRY REPORT
                          3.1  MflTt'R NPOES PERMIT ISSURNCE f)NO COMPLIRNCE--NON-MUNICIPRL
                          '/. or tiRjoR NON-MUNI PERMITTEES IN COMPLIHNCE WITH SCHEDULES
             STRRT LEVEL
:.'i ''l.fi'-lllEO UNITS    0
X fiCTLIfll. UNITS     0
77
77
79
02
82
86
                                                                     87
             05
             07
                          '/. OF  l-'fiJOP. NON-MUNI PERMITTEES  IN COMPLIRNCE WITH SCHEDULES

                                    NOV
                                         DEC  JHN
       FEB
                        nrif?  nrR
                                                               MRY
           JUN | JUL
                                                                            RUG
                                                  SEP
             STRRT LEVEL
'.'.' '"I. f!'-!NF.U UNITS    0
X >'••.'. MTU. UNITS     0
S3
91
86
09
85
83
91
91
91
91
     This  graph  indicates  the percentage of  major  nonmunicipal  permittees  reported
     to be meeting the compliance  schedule requirements  of their permits.   Region
     X reported  that  91% were in compliance  at the end of FY-76, slightly  ahead
     of the national  level  of 87%.
                                                 X - 4

-------
        UJ
        CJ
        £ 2SCOO
      _i g 20000
           rv 1976 MflNflGEMENT SUMMARY REPORT
3n HfiTER  NF'Dlf-S PERMIT  ISGURNCE HND COMPLIF1NCC-NONMUN1CIPHL
RECON INGPECC  OF MHJOR TNON-MUNI)  PERMlTTi-.EG  BY  EPfi « GTflTEG
         STRRT LEVEL.
     UNITS
 Uil.. iJNITG
 "il_/COMMIT
   3145
   1730
    13
6174
3507
3304
7082
 50
12311
3137
 65
MISS
11301
 SO
                       RECON INf.l'HCO OP  MflJOR  TNON-MUNIJ PERMITTEES BY EPH ft STOTES
         GTfiRT LEVEL.
N'MP.U UNITS
Ufii.  UNITS
I.!(1L/COMMIT
    21
    47
    25
 41
 84
 51
                                                         52
 75
                                                35
               11
               165
               251
               152
 Tliis graph reflects  noiimunicipal  reconnaissance  inspections performed by Region X staff and by
 the States in the Region.   Region X performed 39  inspections, exceeding its commitment to  35
 inspections.   All of the States in  the Region exceeded their commitments.  The  total of 251
 inspections is 2.3 times the number of major nonmunicipal permittees in the Region.
                                                 X  -  5

-------
                                        FY  1976 MflNflGEMENT SUMMflRY REPORT
                             3q wrm.R  NPOLT, PERMIT ISSUANCE RND conrLiflNC
                             SftMPLING INGPECG OF KfUfNON-MUNI)  PERMITTEES  BY  F.m  f.  STHTt'S
               GTRRT L.EVEl.
O '•UV-im-U UNITS    0
X i'ir."li:iii  LIMITS     0
'/. fit M'l'.l /("[.IMP IT    0
                                 OH
                                 623
                                  13
              1050
              H04
               30
              2727
              2-150
              3G26
              3263
               60
              4716
              4357
               02
                             SUPPLING IN'JPE.fG OF  MPJf NON-MUM I )  PERHITTtifS  OY  EPfl  «. STRTt.'S
              GTfiRT LEVEL
O ''L'ilM! U UNITS    0
x "
-------
                            FY 1976 MfiNncEMENT SUMMIT RETORT
                        :R NPUI::S PERMIT  ISCUONCE RND corirLiRNCE--NON-nuNiCTPf)L
                        NO- Or EPfl NON-MUNICIPRL ENFORCEMENT  RCTIONG
      STRRT LEVEL
Cr.i PLfi'l!!!
X fif/ll.!!'!!.
'I. fJn'I'-'H.
 .l UNITS
 UNITS
231
\2\
44
274
 21
367
•150
35
1156
623
 48
                         1296
                         764
                        MO- Or f.Pfl NON-MUNICIPflL ENFORCEMENT RCT10NG
      STRRT LEVEL
:j.i ir! li'-J.'l!
X 'if H.ii,!.
7 Mr T!!H!
II UNITS
 i.!N] 75
 13
 12
26
29
44
40
35
53
             51
             S3
              66
              70
             106
The  achievement above planned  levels  for nonmunicipal  Enforcement  Actions
shown in this graph results from the  Region  issuing  63 Administrative
Orders against a  commitment of  50.  The Region did not meet  its other
2 commitments, issuing  1  NOV against  a  commitment of 6, and  referring 6
cases to Justice  against  a commitment of 10.
                                          X  -  7

-------
                                    FY 1976 MHNRGEMENT SUMNRRY REPORT
                           WRTER 3(3 NPDES  PERMIT ISGURNCE RND COMPLIRNCE--IHJNICIPRL
                          't. OF nqjOR HUNIC1PRL PERMITTEES IN COI1PLIRNCE WITH SCHEDULES
             STRRT LEVEL.
'.'; rl (••'•ilIRD UNITS    0
X KIT TUMI. UNITS     0
5')
71
             61
       59
       79
               73
               34
               !30
                            '/. CH («i,IOR MUNI PERMITTEES  IN COI1PLIRNCE WITH SCHEDULES
                                OC.T
             STRRT LEVEL
••'.'' H.li'WrD UNITS    0
X i'!. TUfiL UNITS     0
                              T)
                              34
           DEC  JRN
FER
MHR  HPR
             SI
             85
       S3
       34
JUN  JUL
                                                                            RUG
                                                                                GLP
               36
               90
               86
               9Z
     Tliis  graph indicates  the percentage of  major  municipal  permittees reported to
     be  meeting the  compliance  schedule requirements of  their  permits.   Region  X
     reported  that 921 were in  compliance  at the  end of  FY-76,  well  above  the
     national  level  of 821.
                                                 X  -  8

-------
             3 25000
             LU
             d.
           .j z 20000
           >:n '-*
                                       FV 1976 HflNRGEMENT SUHMfiRT REPORT
                              3C  MRTE'R  NPOF.6 PERMIT ISSUflNCE  RND COHPL IflNCE-MUNlC IPfiL
                              RECON IN5PF.CG  Of-'  MflJORfMUNI) PERMlTrt.ES  I3Y  EPfl < STflTLS
              GTRRT LEVEL
* r!. fi'-llir r; UNITS     0
X HI llili!.  UNITf.      0
'/'. Hi' M.!f,!. /L'rim-'IT     0
190,?
227.1
 18
3590
SODS
5463
8998
 71
7290
12S29
 98
12752
lbS71
                              RFC'JN IN'iPFCS  Of-  nflJORfMUNI) PERMITTEES RY  EPR f. STRTtS
              GTRRT LEVEL
      MM.i  UNITS
      <;i ,,'iins
      M! /rni-lfHT
 17
 147
 33
 34
 303
 63
 43
 333
 60
 450
 103
 445
 552
 124
     This  graph reflects  municipal  reconnaissance  inspections performed by Region  X staff and by
     the States in the  Region.  Region X performed 23 inspections,  3 more than its.commitment.
     States in the Region exceeded  their .individual.commitments..  .'Hie States performed  529 inspec-
     tions, 104 more  than their total  commitment.   The total of  552 inspections is more than 3
     times the number of  major municipal permittees in the Region.
                                                    AK    ID    OR    WA
                                      COMMITMENT  - 76    130   175   44
             	ACTUAL.	L_M	15.0	24R__5D	
                                                     X  -  9

-------
                                        FY  1976  MPNnCEriENT SUMMflRY REPORT
                              313 MflTLR  NPDES PERMIT  ISSUflNCE flND COIFLIRNCE-MUNIC
                             jfll'PLING 1NGPECS OF MfiJORf MUNI )  PERMITTEES  BY EPfl * STRIES
              STflRT LEVEL.
in ''! if-INni UNITS     0
X rifTi.sr.1  UNITS     0
v <;r;7iJ!il_/COMMIT     0
                                              1575
                                              13S4
                                               49
                            2180
                            2106
                            DOS!
                            2763
                            3053
                            3323
                             102
                             COUPLING iN:>PF.rc cif nnjoRfMUNn  PERMITTEES PY EPR & STHTF.G
              GTflRT LEVEL
X nf
'i. n.r.
    fiNi-.'! i.) UNITS
    'M'lil  iJNITf,
    1 1 TIL /i u
25
3-1
31
SI
77
77
71
94
87
108
120
11 1
    IT! IV i <-K G^	
     This graph  reflects the  number of municipal sampling inspections performed by Region X staff
     and by the  States in the Region.  Region X performed 11 inspections, 1 less than its commit-
     ment.  All  States in the Region met  or exceeded  their commitments.    The  States performed 109
      inspections.
                                                     AK    W   OR   WA
                                      COMMITMENT  -  5    22   4F   23
                                      ACTUAL      -  5    34   46   24
                                                    X  -  10

-------
3B
  NO,
                                      FY 197S MflNflGEMENT SUMMflRr REPORT
                                      NPDEG PERMIT ISGUP1NCE flNO COMPL IRNCE-nUNICIPfll
                                      INGPECG Of"  HHJOR MUNI PERM ITTt.'EG-EPfl «
              GTRRT  LEVEL
(D P| l>'-!MI:.n  UNITE    0
x rtciiini UNITS     o
X 'f)1.' Ullil/COMMIT    0
  1007
  723
   17
1923
1406
 33
1:791
?277
 53
3751
3601
 85
 4260
 4565
  i07
                                           cs or HRJOR MUNI PERMITTEES-EPH t sims:
                                                                          
-------
               750
                                   FY 1976 MflNflGEMENT SUMMflRY REPORT
                           36 WflTER NPDCS PERMIT IGSUflNCE RND COI1PL inNCE--MUN ICIPRL
                                 NO. OF EPfi IIUNICIPflL ENFORCEMENT flCTlONG
CD PlfiNNEH 'iHl'IS
X RCTUfll. ,ji.H r:.,
V. flCTUHI./I' '"<:•!!'!1
yrR">T LEVEL

    0
    0
    0
M-1
129
 1(3
1:90
"22
 30
439
348
43
617
510
 70
732
604
83
                                 NO, 01  FT'li MUNICIPRL ENFORCEMENT FICTIONS
                  LEVEL
O puni'irirjj i:nrrfi
x ncTUPi. inn ir-
V. RCUJHl. /' 'IMP! I
                13
                8
                IS
             40
             3G
             25
             56
             45
             43
             96
             45
             46
             102
     Region X's Municipal Enforcement  Action  commitments  are similar  to the  Region's
     Nonmunicipal  Enforcement  Action  commitments.   The Region exceeded  its commit-
     ment  for 34 Administrative Orders by  4  issuances.  The Region  was 2 issuances
     short  of its  commitment  for 6 NOVs and  1 short of its  commitment to 5 Referrals
     to Justice.
                                              X -  12

-------
                                     IT J976 tlflNDGEMENT  SUMMRRY REPORT
                        3C WRTE.R  NPDFJS  PERMIT ISSUF1NCE flND COMfLlFlNCE - (-EHERDL FBCIl ITIE.S
                               NO. CEU FflC  OPERS EXflMINEU FOR COMPL  W/PERMIT PROV
              STRRT LEVEL
i.1' ''LiiNMf.O UNITS
X i!' TUiil. UNITS
9!
107
174
206
202
60
349
306
 92
                           469
                                                                                     109
                               NO. FF.n F fir OPER5 CXFiniNED FOR COHPL  H/PERtllT PROV
             STflRT LEVEL
r;;i '••'.rrmi'ri UNITS    o
X ilij'll.ini UNITS     0
'.'. H;.'! |!fl|../COMMIT    0
 7
23
              21
              70
              35
              120
              30
              50
              167
      Region  X exceeded  its  commitment by  more  than any  other Region  (671) .    No
      violations  in compliance  schedules were  found in  the  Region's 3  major
      federal  facility permittees.
                                                  X  -  13

-------
                               FY 1976 tinNROEHENT SUIH1RRY REPORT
               Ifl MRTER  PREP OF  Elf.S t NEC DECLRRRTIONS FOR EPFTS WMT PLT CONSTRUCTION GRTS
                         NO- FlNfU EIGS FILED W/CE'Q ON CONSTRUCTION GRUNTS
_j ^ 200
oc u
2 ° iso
J."r 10
-. m
"- = 100
SO1"


STORT
O PLfiNNril UNITS 51
x fit'njn'. iiiinr, 5:
'/. fitniiii. /f.miniT K.

CT
o iu 20
U-
^ 0
° 15
O uj
llj QO
nr z: JQ
Z 5
n

GTRRT
(!) PLfi'-lHi. !.i !U| 11 G -1
x ncuii'ii. in in r. ^

-
	 . 	 _e_ — — — !!~I_IZ-II^^
i 	
1 1 1 1
JUL RUG SEP OCT NOV DEC JRN PER MflR RPR MHY JUN JUL RUG GLP
F ^ £ A T
L.EVEI
} 62 71 89 103 10
j 62 53 66 73 n
3 SO 61 64 71 8
NO,' F INRI. r I5j; TILED W/CEO. ON CONSTRUCTION GRRNT5

-
_
-^-^L^^^-^^
. ^^-^r^^ 	
1 1 1
JUL RUO SEP OCT NOV DEC JRN FE8 HRR flPR HHY JUN JUL RUG GEP
5r * ' if 1 '
LEVEL.
3 6 9 .12 I!
4 5891!
JJ 4^ b/ /b 10
Cl)
ci: 7-
rt . **"^
JlOOu. x:
( 75 ° S
50 N
25


3
5
3


•z.
' i-1
75feo
50 ^ L>
25


•5
?
0
Region X  is one of  two  Regions that has achieved its  commitment.
                                            X -  14

-------
                             Water 5 - Water Supply

                                    National

1.    Number of Water Supply Program grants awarded.                        53

2.    Amount of FY-76 program grants awarded.                               $7.5 million

3.    Number of Water Supply Program grants refused (Pennsylvania,
     Indiana, and American Samoa).                                          3

4.    Amount of FY-76 program grants reallocated.                            $482,300

5.    Number of States and territories expressed intention to assume
     primary enforcement responsibilities.                                 54

6.    Number of States and territories expressed intention not to assume
     primary enforcement responsibilities (Pennsylvania and Indiana).        2

7.    Number of States and territories assumed primary enforcement
     responsibilities as of September 30, 1976.                             0

                                    Region X

1.    Number of Water Supply Program grants awarded.                         4

2.    Amount of FY-76 program grants awarded, including reallocated
     funds.                                                                $573,500

          a.  Alaska       $156,300
          b.  Idaho        $105,400
          c.  Oregon       $110,900
          d.  Washington   $200,900

3.    Number of States expressed intention to assume primary enforcement
     responsibilities.                                                      4

4.    Number of States assumed primary enforcement responsibilities as  of
     September 30, 1976.                                                    0
                                      X - 15

-------
                      Water 6 - Section 208--Water Quality Management Planning

                                              National

                         Region:    I     II      III      IV     V     VI    VII    VIII    IX     X     Total

1.  Number of areawide
    designations approved
    and funded                     18     14       12      32     32     13     5     22      17    11     176

2.  Amount of funds
    obligated ($M)                $ 13.24  24.25    17.86   23.00  39.59   9.65  5.79  12.55   14.61  6.56  167.10

3.  Number of areawide
    work plans completed
    and approved                   15     11       12      26     25      95     21      10    10     144

                                              Region  X

1.  Number of areawide designations approved  and funded  -- 11

          a.   Alaska       1
          b.   Idaho        3
          c.   Oregon       4
          d.   Washington   3

2.  Amount of funds obligated ($M) -- $6.36M

          a.   Alaska       0.18
          b.   Idaho        1.32
          c.   Oregon       2.54
          d.   Washington   2.32

3.  Number of areawide work plans completed and  approved --10
                                             X  -  16

-------
                                   FY 1976 HflNnGEHENT  SUtlllflRY REPORT
                                 7  HR'L'R  SPUL PREVENTION flND CONTROL
                                NO.  SPCC PLON COI1PL/IMPL INSPECS
O PLfiNNIID HHnr,
x RCTiifiL ,mnr.   5922
'I, Pit'Umi. /' (JIM-MT   bO
   LEVEL
5922
                                         8301
                                         9759
                                          S3
                         9762
                         12283
                          104
            11918
            13289
             112
                                MO,  r.rr;c PI.RN COMPL/IUPL INSPECS
             CSTORT LEVEL
o PLDNMEP u
x HCTuni. i.iHi. i
'/. flCTUHI./1'. MHI
                151
                151
           'l T
233
204
55
362
123
                                                                 352
                                                                 468
                                                                 129
       Region X completed 468 SPCC plan and  implementation  inspections as  of
       Sept.  30,  1976, against  its commitment  of 362.   Since 161  inspections were
       completed  in previous years, the actual number  completed during FY-76 in-
       cluding the  transitional  quarter totaled 307.
                                              X  - 17

-------
               100
                                    F'Y 1975  MflNflOEMENT SUHMRRY REPORT
                              HflTER STHTE HONITORINO PROGRflMS < GUF1I. ITY
                                   NO. OF STflTE LRBORflTORIES EVflLURTEO
             STflRT LEVEL
c ri. fi'inif.r.1 UNITS    o
X ItCTiiril. ..IHITG     0
''. nci iJi'i /iTjni'MT    o
20
11
6?
72
97
 74
 81
114
                                   Nf) - Of STRTE LFIBORHTORIES EVHLURTEO
             GTORT LEVEL
O FLfl'-ltJI !l CNIT5    0
x fir;rijui.  ..KitTfi     0
'(. ni nit!1, /'.'niinn    o
3
75
 •1
 4
100
 4
 4
100
       Region  X  was  committed to  evaluate 4  laboratories  and evaluated  4.   Region  X
       utilized the  evaluation methodology EPA  employed in evaluating EPA Regional
       facilities in  1975.   Region X supplies  its States direct  techinical assist-
       ance for pesticides  and DDT laboratory  analyses.
                                               X  -  18

-------
           ,/, IjOOOO
          . .i ;'•' -10000
          -:-l '"" 30000-
          t- n:
          •r lu
          :"'}} 20000
                                   TY 1976 MflNflOEMENT  SUtlMRRY REPORT
                         2C RIR   - RCSURE COHPLIflNCE WITH FUEL RDOITIVE REGUI.RT10N:
                                NO  GPS GflMPLES TESTED BY FILl.D/LflB METHOD
o pLPNNru mil ir.
x nciuni  i.iMi r;;
•i. Rf/njni /r fiMMn
C-TCi^T LEVEL
    0
    0
    0
5SSG
                                         1 1S17
                                         12802
                                         18017
                                         18723
                                          62
                                      25000
                                      27900
                                       92
              30250
              349bO
               116
                                NO GHS GRILLES TESTED BY FIELD/LHB METHOD
O Pl.PiMI4F.U nil! If.
x ocTuni. ij;n i '•'
'i. ncTuni. /:. !!ni-i i
GHIKT LEVEL
    0
    0
    0
500
900
 36
                                         1000
                                         1100
                                         1500
                                         1500
                                          60
 2000
. 2001
  00
                                                   2500
                                                   2517
                                                    101
      Region X  exceeded  its  FY-76 commitment  for gas  samples tested to  ensure
      compliance  with  fuel additive  regulations.  The Region reported that notices
      of  contamination issued  represented 0.6% of the samples tested.   This
      compares  to the  national  average of 0.61.  In  addition to  contamination
      violations, the  Region detected  636 general availability,  nozzle,  and other
      violations  of the  fuel regulations.
                                               X - 19

-------
                 KY  1976 MRNRGEMENT SUMMRRY REPORT
3R RIR   - ENSURE CONTINUED COI1PLIRNCE WITH SIP REQUIREMENTS IN ERCH STOTf
           NO-  1UENT PT SOURCES  IN FINRI. COMP  W/EMISS REGS
uj £c?uuu
or

_. 3 20000
CC *^3
2 o isooq
(— . V
en Q-
z £ 10000
^.
*' 5000
0
\


-

j 	



-

JUL RUG
STRfU LEVEL
'•'I fi'lNED UNITS 13920
nni'.Rl. UNITS 13920
'iCIUriL /COMMIT 70
!"? i^r
uj / DU
i_>
° o 600
-ii, *
2 o 450
^ CK
"J UJ
^ M 300
ZI
z IbO
0
t

___-r-=
i 	 e=^


-

-

JUL RUG
STRRT LEVEL
rl. fi'UIFD UNITS 493
'if. Him. UNITS 498
i!L 11 Iffl. /COMMIT 67
!-;ninRKO-




_ ^nfrf — " 	 -. 	





OCT N

1-1531
M033
75




r^r-^-zrT





3V OEc| JRN F

Ib418
16984
nz










R^R M

IS9S9
18060
91


	 ^

— ^^ ' .

.

-

3Y JUN| JUL RUG SEP

o

• »— « t~"
1 \^ -^'
tT. "'
50 u. £j
o f '
2 hi N'
0

15976 1938!
1792-1 13367
90 92
NO. IULNT PT SOURCES IN FINRL COUP H/EMISS REGS

zr-==$=~=-~:=~~







OCT N

553
531;
79

Region X nearly met its FY
into final compliance. Of
in final compliance and an
The combined 98%
jj; 	 •-"
rr^^-e -"







JRN F

G18
653
88

yf 	 •
__ -.. — ~\J







i
IB MRR^RPR M

657
689
93


_


-


-
i
3Y JUN| JUL RUG SEP^
I1UU
75 i ^
;F uj
a: ^
50 d* ^_-
u_ ^
o 9.1
25 ^ ^
0

705 739
711 734
96 99

-76 commitment for having point sources come
the 809 known sources
additional
in the Region, 91% are
7% are in compliance with schedules.
compliance level compares favorably to the national level
of 92%. In addition, Region X is tied with Region IX by having the highest
compliance level
among the
Regions .


                               X  - 20

-------
                           FY 1376 MflNflGEMENT SUMMARY REPORT
             3fl RIR  - ENSURE CONTINUED COM''LIflNCE WITH Sir REQUIREMENTS  IN EfiCH
                  NO I DENT PT GRC OUT OF COM H/FNL EMISS REQ NOT ON OCD
      STPRT LEVEL
IJ UNITS  1396
 UNITS   1336
            1109
311
1606
S59
1330
234
HOB
284
1225
                  NO IDEM! f'T GRC OUT Or COM W/TNL EMIOG REQ NOT ON  SCO
      STflRT LEVEL
0 UNITS
 UNITS
23
23
             10
 H
                          0
                          11
Region  X did not  meet its  FY-76 commitment for  reducing the  number of
point sources  in  violation.   In addition to the  12  sources  in violation of
final SIP requirements, 8  sources are  in violation  of applicable compliance
schedules.   The  20 sources  in violation represent   21 of  the known sources
in the  Region  which is significantly better than the 1% violation level
reported on a  national basis.
                                      X - 21

-------
                                  hY  1976 nnNflGEMENT SUMMARY  REPORT
                      9IR   -  I.NGUKE. CONTINUED COMF'LIflNCE HUM SIP  REQUIREMENTS  IN EF1CH
                                UNTlC.IPfmTJ NO E.MF RCTG BY EPfl
                                     3TF1TE
            GTHRT LEVEL.
''.'I n.fi'-IHF.D UNITS    0
X ii1; HjiiL LIMITS    0
'•' ':'. M!!il /COI1MIT    0
3S
40
343
730
72
                                                                             1094
                                                                             1091
                                                                              100'
                                D'-ITICIPRTED NO ENF RCTS BY EPfl
            GTRRT LEVEL
"•• r' !ir!HED UNITS    0
X i\<: n.iru UNITG    0
••: MI nifii./ronniT    o
                                         11
                                         30
                                         46
             14
             42
             10
                         91
             65
             67
             103
          	_	,-—		.	
       Region  X exceeded its""FY-76 commitment for  air enforcement actions. Tfie '
       67 actions consisted of  31  Notices  o"f Violation and  36  Abatement Orders.
       The Region forgot to include 1 civil/criminal proceeding it  initiated  in
       the reported 67  actions.  The States  in the Region also undertook a sub-
       stantial number  of enforcement actions.  The number  of  State  actions is  not
       documented here  since each  State uses a slightly different definition  of
       what constitutes  an enforcement action.
                                             X -  22

-------
                 Air 3B  Air 6 - Delegation of NSPS and NESHAPS

                                    National

Number of States

          Delegated      Start Level    Commitment     Actual 9/30/76

            NSPS              2             41               23
           NESHAPS            2             33               17


                                    Region X

Number of States

          Delegated      Start Level    Commitment     Actual 9/30/76

            NSPS              23                3
           NESHAPS            1              2                2
REMARKS:
Of the Regions committing to State delegations, Region X was the only Region to
accomplish its FY-76 commitment; the States of Washington, Idaho and Oregon have
accepted delegation of NSPS enforcement authority.  The States of Washington and
Oregon have accepted delegation of NESHAPS enforcement authority.
                                       X -  23

-------
                                       TV  1976 MRNflGEMENT SUrtllflRY REPORT
                       7  RIR   - ENSURE COMPLIRNCE OF FEDERflL  FflCILITIL'S  WITH  SIP REQUIREMENTS
                                   NO.  FED PT.  SOURCES  IN COMPLIANCE  WITH SIPS
              CTPWT  LEVEL
O PLfWirrj  UNITS   118
x ncnmi. iwi in    us
''. fiCTuni ."..oni'iT    36
              ISl
              139
              43
              171
              161
              49
221
145
44
269
249
 76
326
246
 75
                                  NO. FED PT.  SOURCES IN CCH1PLIRNCE WITH SIPS
              GTflRT  LEVEL
O PLFINHFM  Linnr.
x RCTuni. ONi TV;
'/. RCUifll f\ 'CH'IT
    Rt.n
-------
                                    FY  1976 MnNHBEMENT SUntlHRY REPORT
                     7  RIR   - ENSURE COI1PLIRNCE OF FEDERRL FRCIL1MLG WITH SIP REQUIREMENTS
                               NO- FED PT- SOURCES OUT OF COHPLIRNCE WITH  SIPS
             GTflRT LEVEL.
O n.flMrii'l! UNITS   101
X nr;T|j!!i. ilMlTfi    101
                             112
no
123
. 120
 74
121
90
111
82
                               NO.-f-ED r-r. SOURCES OUT OF COdPLinNCF. WITH  SIPS
             .THRT LEVEL
O ''LUNMf-'li IJHITG    6
x nr;i mil. ijtins     6
        Seventeen percent  of Region X's federal  point  sources  are  out of  compliance
        with  SIPs.   However, 3  of the  4 sources  out of  compliance  are on  a consent
        declaration.   No  federal  point sources are of  unknown  status.
                                                X -  25

-------
                                      TY 1976 MflNRGEMF.NT SUMMARY REPORT
                          1 PESTICIDC.G -  LSTOBLISM OPf.RflTIONRL STflTt: CERTIFICATION PROGRRI1G
                                     NO. STRTE SECT.  4  CERT PLflNG RPPROVEO
              STRRT LEVEL.
•.'.• r! fHNF.D UNITS    3
X li!'. TlfflL UNITS     3
7 ';•" IIJFIL/COMMIT    6
U
4
0
30
10
19
43
15
29
52
25
43
52
30
r.n
                                     HO- STPTE SECT.  4  CERT PLflNS APPROVED
              STflRT l.EVEl
•'.• rUi'-IUE.U UNITS    0
:-•; 'iruiiiL UNITS     o
•; us, roni./coMMiT    o
    '?F.I-!fiRKGs
              0
              3
              75
               4
               3
              75
               4
               4
              100
               4
               4
             100
       Region  X met  its commitment with an achievement level  of 100%.   The  success
       of  this Region  is  shared with  only  2 other  Regions.
                                                   X  -  26

-------
            •?•„
            o
                             FT 1976 MflNHGEnENT SUIHIFiRY REPORT
                  2R PESTICIDES  - ENSURE PROPER USE FIND HPPLICHTION OF PESTICIDES
                         NO. USi: OND RE-tNTRY  INVESTIGATIONS CONDUCTED
             GTORT LEVEL.
X [1C nil!!
'/. Of. I!!!!!
(I UNITS
 iJI-IITS
/COMMIT
                              195
                              32 b
344
472
 41
499
692
60
731
1162
100
                                                                                 11S9
                                                                                 1399
                                                                                  121
             •z.
             o
                                NO. usr: n^o  RE-ENTRY INVESTIGRTIONS CDNOUCTED
             GTflRT LEVEL
rui'ium UNITS    o
nrii;;'!. iiNi'ir;    o
i'l! irni /TMHI-MT    0
  i-;u-"i"i<.s •
                              20
                              53
                              32
                                    35
                                    76
                                    46
              45
             114
              69
              63
              151
              92
              165
              220
              133
       Region X exceeded  its commitment by performing 33%  more  investigations  than
       it  had anticipated.   The  extent of  this  Region's  involvement  in this program
       is  seen  in its  220  investigations,  ranking second only to Region  IV.
                                                X  -  27

-------
                                     FY 1976 HnNriGF;MENT  SUMMPRY REPORT
                     2C PESTICIDES - CONT EFFECTIVE REGIONHL FOCUS  ON INDUSTRY COMPL M/RF.I; RFQ
                                  NO- OF PRODUCER ESTABLISHMENTS INSPECTED
O PLRNNED UN] K.
X RCTURL UNI If.
•t. PCTURL/COMITI
               'lr, i  I EVIFl.

                 11
372
535
 23
3H i
1 MS
 SO
1278
1802
 79
1710
2264
 99
2290
2685
 117
                                  NO. Of PROIJUCF.R rSTPBLISHtlENTS  INSPECTED
                   I F.VFJ..
O PLRNNED UNI !r.
X RCTURL UNI I;:
V. RCTIJOL/COIIPTI
    REMHRKf,-,
30
30
24
 80
 01
 51
100
130
 86
 118
 ISO
 94
 160
 160
 100
         Region X met its  FY-76 commitment with an  achievement level of  1001.
         Region X conducted 160 inspections and these inspections  resulted in  10
         civil  actions being  taken  against producer establishments.
                                                X -  28

-------
             o 50
                                     FY 1976 MflNflGEMENT SUMMITRY  REPORT
                     1 SOLID WflSTD. -  DF.V  «  IMPLEH COI1PLEM  ST * TED STRflT TO Uf'GRROE GT SW PROGG
                              NO. CTflTt:  STRRTI.CUG FOR CONTROL OF D1GPOGPL SITES
            STORT LEVEL
      U UNITS
     .  UNITS
     . /COMMIT
0
o •
0
                              II
14
11
Z-t
                                                     41
                                                     26
45
37
32
                                                                                      —  0
                                           45
                                           43
             in
             uj
                              NO- GTHTL  GTRnTt.OltS TOR CONTROL OF DISPOGIU SITE.G
            GTRRT LEVEL
'1.!
'i!.'
J  UNITS
UNITG
 0
 t,
67
                                           3
                                           3
                                         100
                             3
                            100
               3
               3
              100
    Region X  had  3  State  strategies  approved for an  achievement level  of  100%
                                                  X  -  29

-------
                                     TY 197G MflNHGEIIENT fHIMMDRY REPORT
                                 - SUPPORT THE DEVELOPMENT OF' STfni. EMERGENCY RESPONSE
                                  NO.  OF" EMERGENCY  RESPONSE PIJIN5 COMPLETED
           .  STORT LEVEL .

'•• nl..riNNED UNITS    II
< nr.TUOL UNITS     II
                                            13
                                            30
                                                35
                                                16
                                                47
                                                                                     21
              10 10
              :?•
              cc
            2   6
            S S
                                  NO.  OF' EMERGENCY  RESPONSE' PLON5 COMPLETED
                   JUL
nuc
     SEP
                                 OI:T
NOV
JON
FE8
MflR
RPR
MflY
                                                                          JUL
OUD
                                                           SEP
                                                                  z u
                                                                  a; *-
                                                                                      •?J3iOOi

                                                                                        50 :
                                                                                        25
                                                                                       •  0
             STORT LEVEL
>":• P|.nNNED UNITS    3
X liCTUOL UNITS     3
'/. ricTuni./co»iniT   75
    REHHRKSs
                     3
                     3
                    75
                                                                        4
                                                                        4
                                                                       100
                                                4
                                               100
    Region  X reached  its  commitment of  4 in  obtaining  an  achievement level of 100%
    Region  X was  among 5  Regions which  accomplished  their commitments for this
    output.
                                                 X -30

-------
APPENDIX

-------
                      PREFACE
The Program Summary Report contains detailed data depicting
the status of all the Outputs and Activity Indicators
reported via the Formal Planning and Reporting System (FPRS)
for the reporting period ending September 30, 1976.

-------
                         DEFINITIONS
"Start Level" - The actual level of accomplishment as of 6/30/75,

"Commitment"  - The actual level of accomplishment for the
                output as of 9/30/76.

"Percent Commitment to Date" - The ratio of the actual level
                of accomplishment to the commitment.

-------
                                            u,s. ENVIRONMENTAL PROTECTION AGENCY
                                               PROGRAM SUMMARY H£PORT (FY-76)
                                                  REPORT DATE SEP, 30, 1976
01   1  HATER - MUNICIPAL FACILITIES PROGRAM MANAGEMENT
                                   REGIONS

                              05     06     07
                                                          01
02
                                                                        03
OU
08
09
10  TOTAL
DOU4R AMOUNT STEP I,2»AND 3 AWARDS (MILLIONS)
                   COMMITMENT
                   TO DATE
                   PERCENT TO DATE

DOLLAR AMOUNT STEP 1 AWARDS (MILLIONS)
                   TO DATE

DOLLAR AMOUNT STfP 2 AWARDS (MILLIONS)
                   TO DATE

DC1LL*R AMOUNT STEP 3 AWARDS (MILLIONS)
                   TO DATE

NUMBER OF STEp I AWARDS
                   TO DATE

NUMBER OF STEP 2 AWARDS
                   TO DATE

NUMBER OF STEP 3 AWApOS
                   TO DATE
333,0 1065,0  790,0  6)1,0 1310,0  316,0  267,0   80,0  760.0  157.0 5739,0
2B1.2  922,7  602,2  616.2  999,6  301,9  206.J   U6.5  669,2  123.3 0008,9
   60     67     76    101     75     96     92     56     66     79     81


  7.3   17,1    8,5   35,0   68,2   19,2    6,5    2,6   22,1   10,9  199.7


  9,
-------
                                            u.s, ENVIRONMENTAL PROTECTION AGENCY
                                               PROGRAM SUMMARY REPORT  (FY-76)
                                                  REPORT DATE SEP.  30,  1976
02

2 WATER - STATE PROGRAM DELEG»TIONS


01

02

03

04

05
REGIONS
06

07

08



09 10 TOTAL
NUMBER HF APPHflVFO STATE NPPES PROGRAMS




NO.




NO.




NO.




NO.





NO.




NO.


START LEVEL
COMMITMENT
TO HATE
PERCENT TO DATE
OF STATES ASSUMING FINAL P&S REV RESP
START LEVEL
COMMITMENT
TO DATE
PERCENT TO DATE
STATES ASSUMING BIO TABULATION REV RESP
START LEVEL
COMMITMENT
TO DATE
PERCENT TO DATE
STATES ASSUMING RESP FOR REV OF CHANGE URDEHS
START LEVEL
COMMITMENT
TO PATE
PERCENT TO DATE
STATES ASSUMING OHM MANUAL »EV
START LEvEL
COMMITMENT
TO DATE
PERCENT TO DATE

STATES ASSUMING INTERIM INSPEC RESP
START LEVEL
COMMITMENT
TO DATE
PERCENT n> DATE
STATES ASSUMING 38A LOAN PROGRAM
ST»RT LEVEL
TO DATE
2
3
2
67

2
3
3
too

0
0
0
0

2
s
2
67
,
2
2
2
too
I

0
2
0
0 •

0
0
0
2
2
100

t
1
1
too

0
1
0
0

1
2
2
100

1
1
1
100


0
2
1
50

0
0
3
4
3
, 75

2
4
3
75

0
0
0
0

2
4
3
75

2
4
3
75


0
0
0
0

1
J
3
4
4
too

5
6
5
83

0
3
0
0

4
b
5
83

5
6
5
83


0
1
0
0

0
0
5
6
5
83

0
5
4
BO

0
5
1
20

0
2
3
150

5
6
6
100


0
0
0
0

0
1
0
t
0
0

5
5
5
too

0
0
0
0

5
5
5
100

5
5
5
too


0
0
0
0

0
0
3
3
3
100

2
3
3
too

0
0
0
0

2
3
4
133

3
4
4
too


0
0
0
0

n
0
4
4
4
100

6
6

-------
U.S. ENVIRONMENTAL PROTECTION AGENCY
   PROGRAM SUMMARY REPORT (FY-76)
      REPORT DATE SEP, 3of 1976
03

NO,




NO.




3* W&TFR NPpFS PFRMIT ISSUANCE AND COMPL! ANCF-NONMUNTC IPAL

MAJOR NON-MUNI PFRMITS ISSUED
START LEVEL
COMMITMENT
TO DATE
PFRCENT TO DATE
MINOR NON-MUNI PERMITS ISSUED
START LEVEL
COMMITMENT
TO DATE
PFRCENT TO DATE
01

036
037
042
101

1012
1500
1417
92
02

151
627
567
90

523
1199
990
83
03

307
559
505
97

1438
2406
2067
tot
00

1021
1224
1170
96

0061
6008
5955
98
05

603
810
696
86

0897
6332
5795
92
HFP.JONS
06

300
407
003
99

1507
2308
2535
108
07

190
260
200
94

2302
4215
0324
103
08

160
168
|66
99

11^0
1608
1653
103
09

(99
201
201
too

1378
1813
1768
98
10

HO
113
111
98

10J5
17B7
1835
103
TOTAL

3865
4886
0625
95

19743
29336
2073''
98
X OF MAJOR NON-MUNI PERMITTEES IN COMPL w/SCHED


NO.



NO,



NO.



NO.



NO.



NO.



COMMITMfNT
TO DATE
HFCON INSPECS OF MAJOR NON-MUNI PERMITTEES BY
COMMI TMENT
TO DATt
PERCENT TO DATE
RECOM INSPECS OF MAJOR NON-MUNI PERMITTEES BY
COMMITMfNT
TO DATE
PEHCtNT TO DATE
SAMPLING INSPECS OF MAJOR(NfJN-MUNI)PERMITTEES
COMMI TMENT
TO DATE
PERCENT TO DATE
SAMPLING INSPECS OF MAJOR N()N«MUNj PERMITTEES
COMMITMENT
TP DATE
PERCENT Tn DATE
65
83
EPA
100
121
121
STATE
838
855
102 •
BY EPA
00
17
' ".'
BY STATE
805
1028
12«
86
89

too
173
I2«

651
606
93

160
158
99

86
87
101
95
98

60
32
53

1683
1432
85

125
119
95

004
4|0
102
87
89

074
320
68

6720
4355
65

too
94
90

1592
1116
70
83
82

128
89
70

1366
840
M

too
124
120

«23
305
82
65
71

225
237
105

990
1399
lol

80
"3
116

162
179
110
85
85

105
110
105

107
164
112

05
68
151

130
86
66
99
100

Jl
2t
68

120
87
70

116
101
87

165
125
76
90
86

94
89
95

113
120
106

10
10
too

02
59
ton
91
91

35
39
111

130
212
163

27
3<>
111

100
too
too



1392
1*31
ea

12766
10070
79

803
814
lot

39 13
3543
91
NON-MUNI NOTICES OF VIOLATIONS ISSUED TO STATES-FPA BY STATE
COMMITMENT
TP DATE
PERCENT TO DATE
NPDES ADMIN ORDERS TO DISCHARGERS By EPA
COMMITMENT
To DATE
PERCENT |0 DATE
7
2
29

40
37
93
00
0
0

100
50
50
72
10
10

300
60
21
8
1
13

122
97
80
12
8
67

06
43
93
0
0
0

120
158
132
16
0
0

34
7
21
'5
47
49

30
23
77
20
12
60

20
21
105
6
1
17

50
63
126
276
81
29

862
563
65

-------
U,3. ENVIRONMfcNTAL PROTECTION AGENCY
   PROGRAM SUMMARY REPORT (FY-76)
      REPORT DATE SEP. jo, 1976
03,

NO,



NO.



NO.

NO.

3A WATFH NPOFS PFRMIT ISSUANCE AND COMPLIANCF-NONMUNTCIPAL

01
02
03
01
05
Rf r.HJNS
06
07
08
09
10
TOTAL
REFERRALS BY EPA TO DOJ OF CASES INVOLVING DISCHARGERS
COMMITMENT
TO DATE
PERCENT TO DATE
NON-NPDES ENF ACTIONS TAKEN BY EPA
COMMITMENT
TO OATE
PERCENT T" t>ME
MAJOR NUN-MUNI DISCHARGERS IDENTIFIED BY STATE
START LEVEL
To DATE
MINOR NON-MUNJ DISCHARGERS IDENTIFIED BY STATE
ST»WT LEVEL
TO PATE
16
9
56

75
218

137
ana
1510
1709
36
9
25

190
190
100
627
585
1300
1738
12
11
92
*
too
128
128
511
531
1019
1880
31
33
97

166
232
(10
1198
1020
6002
5559
20
21
105

355
122
119
7«e
750
6185
7082
6
9
150

500
506
101
367
J70
6892
7817
8
6
75

120
231
193
215
206
3871
1127
12
11
92

75
51
72
166
168
1115
1819
U
5
125

118
171
117
817
217
17|5
1698
10
6
60

80
117
116
113
113
2019
2026
15»
120
76

1779
2272
12"
5? 32
UliflJ
31908
30105
NO. MAJOR NON-MUNI PERMITS MODIFIED/REISSUED BY STATE
                   TO DATE                                 127     136     51

NO. MINOR NON-MUNI PERMITS MODIFIED/ISSUED BY STATE
                   TO DATE                                 190     212     71

NO  STATE FORMAL ENFORCEMENT ACTIONS
                   TO OAtF.                                  36      11       0
NO. MAJOR NON-MUNI DISCHARGERS IDENTIFIED ftY STATE- -REGION  II
     T9 Snnrfifl on ;il major non-municipal dischargers have been
identified that are within none of our four states.  They consist
of the discharge from offshore drilling activities in the  '
Atlantic Ocean.  We designate them as AT for Atlantic Ocean and
will so report them.   Additional FPRS reporting capability,
0203B01
-------
\ OF MAJOR NON-MUNI PERMITTEES IN COMPL W/SCHED--REGION IX
     Guam Territory--o£ the 3 facilities constituting the 50%
out of compliance, 2 have been issued Sec.  309 orders, and one
(a FF) has been referred to OFA.
% OF MAJOR NON-MUNI PERMITTEES IN COMPL W/SCHED--REGION IX
     State of Arizona—the one facility constituting the 501 out
of compliance has been sued by EPA pursuant to Sec. 309.


NO. RECON INSPECS OF MAJOR NON-MUNI PERMITTEES BY EPA--REGION IX
•Performed more reconnaissance inspections on municipal
permittees, total number of reconnaissance inspections  (both
municipal and non-municipal) exceeded commitment (150 vs. 149).
NO.  RECON  INSPECS OF MAJOR NON-MUNI PERMITTEES BY STATE--
REGION  IX
      State  of  Nevada lost their primary inspector, therefore,
prior knowledge  of the program by the replacement caused reduced
productivity.



WATER 3A NPDES PERMIT ISSUANCE AND COMPLIANCE.NON-MUNICIPAL--
REGION  I                                      .  .         .  .  ,
	TKe number  of sampling  inspections of major non-municipal
permittees  did not meet  the  TQ commitment since efforts were
directed toward  an unplanned high priority PCB study.

-------
                                            U.S. ENVIRONMENTAL. PROTECTION AGENCY
                                               PROGRAM SUMMARY REPORT  (FY-76)
                                                  REPORT OATF 3EP, 30,  1976
04 3» WATFR NPPFS PFRHTT ISSUANCE AND COMPLIANCE-MUNICIPAL


01
02
03
04
05
REGIONS
06
07
08
09
10
TOTAL
NO. MAJOR MUNI PERMITS ISSUFD




NO




X


X


NO



NO



NO



NO



NO



START LSVfL
COMMITMENT
TO DATE
PERCENT TO DATE
HINDU MIIMJ PERMITS ISSUED
START LEVEL
COMMITMENT
TO PATE
PERCENT TO DATE
MAJOR M'uni PERMITTEES IN COMPL W/SCHED
COMMITMENT
TO DATE
MAJOR MUNI PERMITTEES IN COMPL «/EFF LIM
COMMITMENT
TO DATE
. RECON iNSPECS OF MAJOR MUNi PERMITTEES BY EPA
COMMITMENT
TO DATE
PERCENT TO DATE
. RECON INSPECS OF MAJOR HUNJ PERMITTEES BY STATE
COMMITMENT
TO DATE
PERCENT TO DATE
. SAMPLING INSPECS MAJOR MUNI PERMITTEES BY EPA
COMMITMENT
To OATE
PERCENT tO DATE
. SAMPLING INSPECS OF MAJOR PERMITTEES BY STATE
COMMITMENT
TO DATE
PERCENT TO DATE
. ORM INSPECS OF MAJOR MUNI PERMITTEES-ERA * STATE
COMMITMENT
TO DATE
PERCENT TO DATE
383
385
374
97

246
315
322
102

75
65

95
99

35
47
131 ,

3754
4237
113
x
19
19
too

730
663
91

250
22*
91
411
510
536
99

583
970
1173
121

66
89

95
91

14
Id
100

1117
2«l4
216

60
62
103

36
05
125

333
3J>6
98
254
350
410
117

616
950
2001
211

63
67

65
68

41
46
112

1965
1912
97

24
23
96

453
221
49

120
589
09|
ll<»8
1455
1369
94

681
1593
844
53

80
96

60
61

89
166
187

2990
4121
I3fl

80
29
36

875
1408
161

2029
1474
73
474
548
553
101

4078
49Q4
4545
93

87
80

75
76

70
61
87

1138
108)
95

61
95
156

66^
244
37

402
404
100
341
378
370
98

1485
1622
1602
99

75
53

65
65

107
130
121

185
192
98

68
102
150

143
212
Iu8

596
796
134
282
455
411
90

1574
2410
2545
106

71
80

66
80

180
160
89

262
369
141

85
100
lie

1*6
158
101

335
514
153
217
227
228
too

773
856
833
97

96
'3

93
90

63
44
70

93
91
98

38
39
103

188
302
161

159
166
106
193
233
234
100

227
263
267
102

90
81

80
81

55
61
111

149
181
121

10
It
110

56
70
125

0
15
0
153
156
156
100

53b
581
566
101

86
92

85
86

20
23
115

425
529
124

12
11
92

96
109
ltd

36
52
144
3906
4727
06141
90

10799
14464
147|8
102







674
752
112

12078
15119
125

457
49|
107

3396
3432
tot

4260
4566
107
NO. TECH ASSIST PEMOS AT MAJOR MUNI P£RMITTEES-EPA H STATE
                   COMMITMENT
10
                     25
51
109
45
21
20
281

-------
      U.S. ENVIRONMENTAL PROTECTION AGENCY
         PROGRAM SUMMARY RFPORT (FY-76)
            REPORT DATE SEP, 30, 1976
04 3B WATFR NPDF.S PERMIT ISSUANCE AND COMPLIANCE-MUNICIPAL'
i
NO, TECM ASSIST DEMOS AT MUOR MUNI PFRMTTTFES-EPA *
TO DATE
' PERCENT TO OATE
01
STATF
13
130
02

0
0
03

32
0
04

28
112
05

32
63
REGIONS
06

166
152
07

65
(44
NO. MUNI NOTICES OF VIOLATION ISSUED TU STATES-EPA BY STATES
COMMITMENT
TO DATE
PERCENT jo D*TE
NO MUNI HPDES ADMIN ORDERS ISSUED TO DISCHARGERS BY
COMMITMENT
TO OATE
PERCENT TO OATE
0
0
0
EPA
30
26
87
40
0
0

80
76
95
25
9
36

106
1 1 9
112
7
2
29

89
42
47
19
29
153

57
71
125
0
0
0

20
32
160
13
5
38

85
46
54
08

26
124

30
16
53

6
12
200
09

0
0

24
25
104

Ifl
24
133
10

33
165

6
4
67

34
. 3fl
112
IHT*L

395
101

164
90
55

5?5
4H6
93
NO. MUNI REFS HY EPA TO OMJ OF CASES REGARDING DISCHARGERS
COMMITMENT
T(1 DATE
PERCENT T» OATE
NO. MAJOR MUNI DISCHARGERS IDENTIFIED BY STATE
START LEVEL
Tn °*TE
NO, MINOR MUNI DISCHARGERS IDENTIFIED
START LEvEL
TO OATE
NO MAJHR MUNj PERMITS MODiFjEO/REiSSUED BY STATE
TO DATE
NO. MINOR MUNI PERMITS MODIFIED/REISSUED BY STATE
TO DATE
NO. STATE MUNI FORMAL ENF ACTIONS
TO OATE
NO. MAJOR MUNI PERMITS ISSUED- -REGION IX
State olr California exceeded its commitment for
inspections by 13 inspections.
\ MAJOR MUNI PERMITTEES IN COMPL W/SCIIED- -REGION VI
1
1
100

385
3«5
299
112
37

41

in

sampling


14
2
If

477
568
,1100
1163
21

23

4




6
6
100

270
413
1537
2963
83

68

0




2
2
100

1 399
1415
1343
1409
24

23

0




1
0
0

567
S67
4491
6238
213

976

1236




1
1
too

352
357
1556
1603
56

«2

0




10
9
90

364
301
|7«2
1862
123

847

If




2
2
100

227
227
836
863
95

229

78




1
1
too

214
217
232
261
21

29

47




5
a
no

156
lr>5
59B
606
62

224

92




43
20
65

44J|
4605
13774
17380
735

2S02

I5R6




Misconception of methods used to compute previous data
submitted in June.
L1IAJOR MUNI PERMITTEES IN COMPL W/SCIIED- -REGION IX
S t £1 1" f* r» f Ma ii i f\ ».__•• 1. J r ~!" "_! " V 1 ' _ i ' • — • .






















constituting the 12* out

-------
% MAJOR M.IMT PERMITTEES IN COMPL W/SCHED- -REGION IX
	State of California--while less than the initial TY-76
commitment, this rate is better than anticipated, reflecting
permit modifications by California.   '


I MAJOR MUNI PERMITTEES IN COMPL W/SCHED--REGION IX
     State of Hawaii--b'f the 6 facilities constituting the 35%
out of compliance, EPA issued a finding of violation to one,
and the.State of Hawaii is reviewing modification requests on
the other 5.         .

I MAJOR MUNI PERMITTEES IN COMPL W/SCHED--REGION IX
     State of Arizona—the 4 facilities constituting the 141 out
of compliance have all been sent letters by EPA requiring
corrective action.                                 >

 % MAJOR MUNI PERMITTEES  IN COMPL W/EFF  L1M--REGION IX
     State  of Arizona--the minor difference  (3$) from  comt; of  the
 2 facilities constituting the  71 out of compliance,  EPA has referred
 one to  the  U.S. Attorney for prosecution pursuant to Sec.  309 and
 issued an order to  the other.

 NO.  RECON INSPECS OF MAJOR  MUNI PERMITTEES BY STATE--REGION IX
      State of Nevada lost their primary inspector,therefore,
 prior knowledge of the program by  the  replacement  caused  reduced
 productivity.

 NO.  SAMPLING INSPECS MAJOR MUNI PERMITTEES BY EPA--REGION IV
 —''   The FY-76 commitment for sampling inspection  of major
 municipals by EPA should read 24.   Also,s an unplanned, but
 significant amount of resources were devoted to monitoring PCB  s
 in South Carolina, Georgia, and Alabama.

 NO. SAMPLING INSPECS OF MAJOR PERMITTEES BY STATE--REGION IX
 ~State of Nevada sampling inspections were dependent upon
 obtaining a mobile lab with supplemental 106 Grant  funds.  The
 award, pf supplemental funds was delayed such that Nevada was
 unable to obtain the mobile in time to conduct sampling inspections
 before 10/1/76.
 NO..MAJOR MUNI DISCHARGERS IDENTIFIED BY STATE--REGION III
      These numbers fluctuate depending on the number of cancell-
 ations during the quarter.
 NO. MINOR MUNI DISCHARGERS IDENTIFIED--REGION  III
      These numbersfluctuate depending  on the  number  of cancell-
 ations during the quarter.

-------
                                             U,9, ENVIRONMENTAL PROTECTION AGENCY
                                                PROGRAM SUMMARY RFPI1RT (FY-76)
                                                   REPORT DATE SEP. 30i 1976
05

NO.


NO.


NO.

3c WATER NPPFS PERMIT ISSUANCE AND COMPLIANCE -

FED FAC OPERS EXAMINED FOR COMPL n/PEHMIT PROV
COMMITMENT
TO DATE
PERCENT TO DATE
MAJOR FED FAC PERMITS ISSUED
START LEVEL
TO DATE
MINOR FED FAC PERMITS ISSUED
START LEVEL
TO DATE
FEHFRAL FACILITIES
01

30
24
eo

7
7
103
104
02

70
67
96

9
9
75
68
03

26
17
65
'
22
32
126
138
04

30
30
too

40
42
333
429
05

34
30
86

6
2
226
208
REGIONS
06

83
92
111

0
65
0
349

07

65
68
105

25
25
110
126

08

33
46
139

12
12
92
97

09

68
fl6
126

23
35
129
154

10

30
50
167

2
3
230
266

TOTAL

510
109

146
232
1426
1939
 NO  MAJOR PERMITS JN VjOL»TiON OF COMPL SChED
                    TO DATE
NO. MINOR PERMITS IN VIOLATION OF
                   TO DATE
                                         SCHED
                                                            24
11
 6


13
                                                                                               10
                                                                                               45
                                    2


                                   10
14


23
 0     41



39    172
 NO.  PHD l-'AC OIM1RS EXAMINED FOR COMPL W/PI-RMIT PROV (APPLIES TO
 ALL  7  STATES)--REG IQTTTX		
      Region IX's NI'DES Enforcement commitments were exceeded in
 4  categories,  met exactly in one, and not met in one.  The category
 not  met,  Notices to Non-Municipals, reflects a low level of
 violations combined with adequate action by California in
 response  to pre-notice notifications from EPA to the State.  The
.sum  of NI'UES enforcement actions taken also exceeded total
 commitment for NI'DES enforcement actions.  Region IX also
 exceeded  its non-NPDES enforcement action commitment.      .  .
WATER  3C  NI'DES  PERMIT ISSUANCE AND COMPLIANCE-FEDERAL I-'ACILITIES-
RECfpTT
     The  number of minor federal facility permits issued has
decreased due  to facilities tying-in to municipal systems or
being  disconnected.
 NO.  MINOR FED FAC PERMITS ISSUED--REGION V
      250 minors  issued.   Of this amount 20"8 are still in effect.

-------
                                            U,3, ENVIRONMENTAL PROTECTION  AGENCY

                                               PROGRAM  SUMMARY REPORT  (FY-TM
                                                  RtPORT  DATE SEP.  30,  1976
06 4A WATER PREP OF EISS * NET, DECLARATIONS FOR fp»is WHT PLT CONSTRUCTION GRTS REGIONS

NO. FINAL
NO. STEP
NO. STEP
NO. DRAFT
NO. FINAL
REGION IV

EISS EILEO W/CE« ON TREAT PLANT
START LEVEL
COMMITMENT
TO DATE
PERCENT TO DATE
2 GRANTS AWARDED FOR WHICH FINAL
START LEVEL
TO DATE
J GRANTS AWARDED FOR WHIcH FINAL
START LEVEL
TO DATE
EISS FILED w/Cf.Q ON TREAT CONST
START LEVEL
TO DATE
EISS FILED W/CGQ ON TREAT PLANT
01 02 03 04 05 06 07 08 09
CONST/GR ACTIONS
044 12 a 11 376
a 6 6 IS 11 10 7 13 13
2 4 6 1
-------
                                            u,3.  ENVIRONMENTAL  PROTECTION  AGENCY
                                               PROGRAM SUMMARY  REPORT  (FY-76)
                                                  REPORT  DATE  SEP.  30,  1976
07
        WATFR  PREPARATION OF FISS FOR NEW SOURCE  DISCHARGE  PERMITS                        REGIONS

NO,


FINAL EIS3 FILEP W/CFO FOR NSp PERMITS
COMMITMENT
TO DATE
PERCENT TO DATE
01
3
0
0
02
0
0
0
03
1
0
0
00
1
0
0
05
0
0
0
06
3
0
0
07
1
0
0
08
0
0
0

0
0
0
8
13
17

NO. NSO PERMITS ISSUED FOR WHICH FINAL EIS FILEP TO CEO
                   T0 RATE                                  OOOaOOOOOl       3


NO. DRAFT EJSS FILED W/CEO FOR NSO PERMITS                  „      „      „      ft      „      n      n      n      n      I       I
                   TO DATE                                  0000000001       I
NO. FINAL HISS FILED W/CEQ FOR NSP PERMITS — REGION  IV
     One final HIS, coauthored with another Federal  lead Agency,
has been filed with CEQ.  Also,  two negative declarations have
been issued  for NSD permits  in FY-76.
 NO._ FINAL  KISS  FILED W/CEQ  FOR  NSP  PERMITS — REGION  VI
      Shortfall  was  identified in  3rd qtr of  FY-76 but  too  late
 to reduce  commitment,  applications  not  received.
NO. DRAFT E1SS FILED W/CEQ TOR NSD PERMITS--REGION IV
     Five draft CJSs, coauthored with other Federal lead Agencies,
have been filed with CI:Q.  Also, meetings were held with 171
potential new source industries to discuss NEPA requirements.

-------
                                              U.S.  ENVIRONMENTAL PHUTECT1UN AGENCY
                                                 PROGRAM SUMMARY REPORT (FY-76)
                                                    REPORT DATE SEP, 30, 1976
OB «c WATFR PREPARATION OF DRAFT FISS ON OC.FAN HISPOSAL 3TTKS

NO. pRAFT FJ3'3 PUnLTSMED FOR PROPIISFD OCFAN nISPfl3*L
COMMITMENT
TO PATE
PERCENT TO DATF.
01
3ITE3
0
0
0
02
1
1
100
03
2
0
0
0«
0
0
0
05
0
0
0
REC1TON3
06
0
0
0

07
0
0
0

OB
0
0
0

09
0
0
0

10
1
I
100

TOTAL
U
a
50
NO. DRAFT LSISS PUBLISHED FOR PROPOSED OCF.AN DISPOSAL  S1TCS--
RECilON X
     Rater 4C:  No permit applications were completed,  therefore,
no EIS.

-------
                                            U,S, ENVIRONMENTAL PROTECTION AGENCY
                                               PROGRAM SUMMARY REPORT (FY-76)
                                                  REPORT DATE SEP,  30,  1976
09

NO,



NO.



NO.



NO.



5 WATFR WATFH SUPPLY

STATF WATER SUPPLY PROP, PRANTS AWiRoEoiP"|M ENF NODWR
COMMITMENT
TO DATE
PERCENT TO DATE
STATE MATER SUP PROG GRANTS AWARDEDIUNDERGROUND INJECT
COMMITMENT
TO DATE
PERCENT TO DATE
STS OFFICIALLY APPLY TO EPA FOR PRIM ENF RESPlPRIM FOR
COMMITMENT
TO DATE
PERCENT TO DATE
STS OFFICIALLY APPLY TO EPA FOR PRIM ENF RESPlUNDERGRD
COMMITMENT
TO DATE
PERCENT TO DATE

01

6
6
100
•
6
0
0
NPDWR
6
0
0
INJECT
0
0
0

02

4
4
100

4
0
0 .

3
0
0

3
0
0

03

5
5
too

8
0
0

4
0
0

0
0
0

04

0
e
0

0
0
0

0
0
0

0
0
0

05

5
5
too

0
0
0

0
0
0

0
0
0
REGIONS
06

5
5
100

0
0
0

0
0
0

0
0
0

07

4
4
100

4
0
0

4
0
0

4
0
0

08

6
6
too

6
0
0

0
0
0

0
0
0

1)9

6
7
117

0
0
0

0
0
0

0
0
0

to

4
4
100

2
0
0

4
0
0

2
0
0

T(1T«L

45
sa
1?0

30
0
0

21
0
0

9
0
0
WATER 5 WATER SUPPLY--REGION I
     Since planned commitments could not be met, regulations
governing underground injection control are not now expected
from IIQ until FY-77.

-------
                                           U,S, ENVIRONMENTAL PROTECTION AGENCY
                                               PROGRAM  SUMMARY REPORT  (FY-76)
                                                  REPORT  DATE SEP,  30,  1976
to
NO.

NO.
NO.

NO,
NO.
NO.
t> WATER 206 AREAWIDE PLANNING
STATE C"NTINUING PLANNING PROCESSES REVISED ft
TO DATE
AREAWIDE »GENcIES WITH APPROVED DESIGNATIONS
TO DATE
AREAWIDE AGENCIES DESIGNATED BY GOVERNOR BUT
TO DATE
OF AREAwiDE AGENCIES WITH G"*NTS AWARDED
TO OATE
AGENCIES WITH CONTRACTS WITH STATES ON STATE
TO DATE
OF STATFS WITH GRANTS AWARDED
Tfl ftATF
01
APPROVED
0
17
MOT APPROVED BY
1
17
MGMT, HOLE
12
5
02 " 03 0« 05 06 07 06 09 10 TOTAL
5 (| 5 6 0 fll
"
14 , 12 32 32 13 5 22 17 11 175
nn5210300l2
y ii j c. » *
,« |2 32 32 12 5 22 17 11 171
9 6 1* 17 9 5 la 7 7 10«
« 5 « 5 5 a * * « 50
WATER 6 - 208 AREAWIUE PLANNING--REGION I
     The decrease in the number of Areawide Agencies designated
by the Governor but not approved by EF'A is due to Connecticut
having been funded in FY-76.
NO. OF STATES WITH GRANTS AWARDED--REGION IX
     The changefrom 6to 4 wasdue to Headquarters revised
definition of the output.                                  >

-------
U,3. ENVIRONMENTAL PROTECTION AGENCY
   PROGRAM SUMMARY REPORT (Fy-76)
      REPORT DATE SEP, 30, 1976
11

NO.




NO.


NO.


NO.


NO.


NO.


NO.


7 WATER SPILL PREVENTION »ND CONTROL

SPCC PL»N CUMPL/IMPL INSPECS HY STATE
START LEVEL
COMMITMENT
TO DATE
PERCENT TO HATE
CONTINGENCY PLANS FOR HAZ SUBSTANCES DEVL'O
START LEVEL
TO DATE

01

130
334
615
Ida

0
0

02

75
375
437
117

1
1

03

0
192
2<>2
105

0
0

01

4930
7566
777U
103

0
0

05

16
too
922
231

0
0
REGIONS
06

265
898
987
110

0
0

07

140
550
700
127

0
0

08

116
228
257
113

0
0

09

89
913
927
102

0
0

10

161
362
(168
129

1
I

TOTAL

5922
118(8
13289
112

2
2
CASES REFERRED TO C,r., FOR PREV ACTS (TRANS-RELAT pACS)
START LEVEL
TO DATE
CASE PF.FID Tt) EPA ENF FOR VIOL f)F PREV HEG-NON TRANS
START LFVEL
TO PATE
SPILLS RETIRING REMOVAL ACTIONS BY EPA
START LEVEL
TO DATE
SPILL REMOVAL ACTIONS MONITORED BY EPA
START LEVEL
TO DATE
SPCC PLAN AMENDMENT INSPECTIONS
START LEVEL
TO DATE
20
74
FACS
(17
2<,4

6
19

210
286 ,

10
43
2
2

0
0

3
10

60
176

1
20
0
0

0
112

0
7

0
95

0
23
not
126

1101
784

13
20

128
332

3
2a
0
244

253
036

5
17

767
1581

6t5
651
0
0

0
301

3

-------
                                            U.S.  INVIHONMENTAL PRUHCTION AGENCY
                                               PROGRAM SUMMARY REPORT (FY-76)
                                                  REPORT DATE  SEP.  30,  1976
12

NO,




NO.




NO.


NO,


6 W4HR RASIN PLANNING

BASINS W/PHASE 1 PLNC. SUBSTAN COMPL'O
START LEVEL
COMMITMENT
TO DATE
PERCENT TO DATE
PHASE 1 BAslN PLANS APPROVED
START LEVEL
COMMITMENT
TO DATE
PERCENT TO DATE
303CE) BASINS IDENTIFIED
START LEVEL
TO OATE
BASINS w/pHASE 2 pLNG SUBSTAN COMpLETF.D
START LEVEL
TO DATE

01

38
7«
70
100

10
70
51
69

70
70

0
0

02

29
92
00
08

17
69.
29
02

92
93

0
0

03

7
06
03
, «

1
31
10
OS

06
06

0
0

00

07
92
67
95

7
60
02
50

92
93

0
0

05

29
09
00
82

0
06
21
06

76
73

0
0
REGIONS
06

01
57
57
100

37
57
57
100

51
57

0
0

07

31
03
03
100

6
03
27
63

03
03

0
0

08

31
53
51
96

19
53
36
72

53
53

0
0

09

16
00
35
68

0
29
29
100

09
09

0
0

10

27
57
51
69

1
51
29
57

62
60

0
0

TOTAL

296
603
525
67

98
537
337
63

638
601

0
0
NO. BASINS W/PHASE  1 PLNG SUDSTAN COMPL'D--REGION V
     Previousreportingin error.
NO. PHASE 1 BASIN PLANS APPROVED--REGION II
     Includes 17 formally approved plans and 12 draft plans
approved.
NO. PHASE 1 BASIN PLANS APPROVED--REGION V
     Previous reporting in error.
NO. 303 E BASINS 1 DENTIFH-P- -REGION X

basin"pl^s!
                                     c°ns°^ation of several

-------
u,s, ENVIRONMENTAL PROTECTION AGENCY
   PROGRAM SUMMARY HEPOHT (FY-76)
      REPORT DATE SEP, 30, 1976
13

NO,
9 WATER ST»TE MONITORING PRORRAMSI QUALITY

STATE LABORATORIES EVALUATED
COMMITMENT
TO DATE
PERCENT TO D*lE
ASSURANCE
01
6
6
100

02
8
13
150

01
7
7
100

04
16
25
139

05
6
6
100
REGIONS
06
6
6
too

07
6
n
67

06
6
6
100

09
7
0
It"

10
4
a
100

TOTAL
74
flU
II «

-------
                                            U,S,  ENVlHONMtNTAl  PROTECTION AGENCY
                                               PROGRAM SUMMARY  REPORT (FY-76)
                                                  REPORT  DATE  SEP,  30,  1976
\li 10 HATER - 4MHIFNT MONITORING

NO. MWOSS STATIONS W/CURRF.NT DATA STOREP
START LEVEL
COMMITMENT
TO DATE
PERCENT TO DATE

01
24
25
20
96

02
5
5
0
0

03
14
l«
14
. 100

04
21
21
8
38

05
6
12
12
100
Rf T.IONS
06
28
22
22
too

07
0
33
20
61

06
21
21
20
95

09
7
7
7
100

10
9
15
18
120

TOTAL
135
175
H5
81
NO^_MWQSS STATIONS W/CURUHNT DATA STORED—REGION H
     NWQSS Stations discontinued pending resolution of funding
arrangements for PY-77.

-------
»J,3, ENVIRONMENTAL PROTECTION AGENCY
   PROGRAM SUMMARY REPORT (FY-76)
      REPORT 0*TE SEP. JO, 1976
15

NO.




NO,


NO.


NO.


ii WATFR - SUTF MONITORING PROGRAMSI APPROVES

FY-76 ST*TE MONITORING PROGS A
START LEVEL
COMMI TMEMT
TO OATE
PERCENT TO OATE
QUALITY CONTROL CQMP OF FY-76
START LEVEL
TO OATE
MONITOR STRATEGY COMP OF FY"7*>
ST&RT LEVEL
TO DATE
OATA HANDLING PROCEDURES COMPS
START LEVEL
TO OATE
01

6
b
b
too
STATE MONITORING PROGS APPR'D
18
18
STATE MONITORING PROGS APPR'O
24
24
OF FY«7b STATE MONITORING PROG
4
b
02

0
4
n
100

0
0 .

0
0

0
0
03

0
9
9
100

0
0

0
0

0
0
04

0
6
8
100

0
0

0
0

0
8
05

2
b
6
100

2
5

2
5

2
5
REGIONS
06

0
5
5
100

0
S

0
5

0
5

07

0
0
It
0

0
0

0
u

0
0

08

0
b
6
too

0
b

0
b

0
b

09

0
b
b
100

1
2

0
18

0
5

10

0
4
4
100

0
4

0
4

0
4

TOTAL

a
54
58
107

21
40

26
62

b
39

-------
11,3, ENVIRONMENTAL PROTECTION AGENCY
   PROGRAM SUMMARY REPORT (Fy-76)
      REPORT DATF SEP, so, 1976
16 12 WATFR - SHA LOAN RFVTF.WS

NO, OF SPA


NO, OF SRA


S VALUE OF



i OAN APPLICATIONS RECEIVED
START LEVEL
TO DATE
LOAN CERTIFICATIONS ISSUED
STAPT LEVEL
TO DATE
SPA LOAN APPLICS FOR WHICH CERTS HERE
START LEVEL
TO DATE
01

18
35

16
35
ISSUED(MILLIONS)
5.8
7.U
02

0
3

0
3

0.0
0.1
03

7
9

3
6

2,7
0,4
0<4

6
13

1
4

0,0
0.1
05

7
9

2
u

0.1
1.2
REGIONS
06

3
3

3
3

0.1
0,1

07

3
9

2
4

0,5
0,5

06

0
1

0
0

0.0
0,0

09

3
12

0
6

0.0
1,1


10 TOTAL

1
4

0
1

0.0
0.4

46
96

29
68

9.5
11.3

-------
U.S. ENVIRONMENTAL PROTECTION AGENCY
   PROGRAM SUMMARY REPORT (FY-76)
      REPORT DATE SEP.  30,  1976
17 13 WATF.H - irUllntCATORY HEARINGS

NO M»J PFRn-»ruun HE*H SET/NO INCL UNDER PRFHE»» en
COMMITMENT
To DATE
PERCENT TO DATE

01
IIF 3CHfn/HELp
5
4
60

02
233
337

03
115
122
106

01
50
61
122

OS
70
67
96
REGIONS
06
73
83
11«

07
12
9
75

08
7
10
113

09
11
14
127


10 TUUL
9
11
122
5B5
718
125

-------
U,S. ENVIRONMENTAL PROTECTION AGENCY
   PROGRAM SUMMARY REPORT (FY-76)
      REPORT DATE SEP, 3o» i976
18

NO




NO



NO



NO




NO



NO



NO



NO



NO



1 ilR - fNSURf. FULL CDMPL W/3IP FMTS LIH IN 40CRS PRO.I

. PT, SOU«cF3 np.TERMINFD TO ME IN COMPL W/3IP EMISS
START LEVEL
COMMITMENT
TO DATE
PERCENT TO DATE
, PT. SOURCES DETERMiO TO BE IN V10 W/3IP EMISS 3TOS
START LEVEL
COMMITMENT
TO DATE
. PT, SOURCES OF UNKNOWN COMPL STATUS W/EMISS STD3
START LEVEL
COMMITMENT
TO PATE
SELECT NON-PT SOURCES DET TO BE IN COMP W/3IP EHISS
START LEVEL
COMMITMENT
TO DATE
PERCENT TO DATE
SFLECT NLIN-PT SOURCES DET TO RE IN VIO W/SlP EMISS
START LEVEL
COMMITMENT
TQ DATE
SELECT NON-PT SOURCES OF UNKNOWN COMPLIANCE STATUS
START LEVEL
COMMITMENT
TO DATE
ANT FIELD SURV ACTS TAKEN TO DETERM SOURCE COMP FOR
COMMITMENT
TO DATE
PERCENT T" DATE
Ot
STDS
710
900
779
87

120
10
57

HO
0
21
STDS
6(62
77*8
0
0
STDS
1018
198
0

1086
30.0
0
TO EXCEED PRIM NAAUA
02

1116
1622
1253
77

173
7
91

66
9
22

0
0
0
0

0
0
0

0
0
0
03

2095
2206
1921
,8*

140
29
teo

0
0
2

0
0
0
0

0
0
0

0
0
0
04

727
792
622
79

70
IS
66

11
1
a

411
645
473
73

126
3
124

111
0
16
05

656
1616
I486
92

145
53
(66

42
2
13

351
430
536
125

39
2
5

78
0
5
RFC IONS
06

822
1224
1408
115

188
61
57

298
23
20

45
65
55
85

a
4
23

16
0
a
07

834
1121
1143
102

33
0
16

218
0
18

999
|444
1471
102

56
0
6

267
0
77
08

334
415
427
103

25
1
7

6
0
0

53
157
153
97

7
0
5

0
0
3
09

188«
2079
2042
98

too
49
55

60
0
1

0
0
0
0

0
0
0

0
0
0
10 TOTAL

245 9453
295 12270
305 11386
103 93

50 1044
14 239
8 703

11 752
0 35
0 III

151 8172
195 10704
204 2892
105 27

20 1274
5 212
1 164

15 1593
0 300
0 105
PT SOURCES
100
1«2
1"?
30000
35262
lie
300
271
90
5634
M4
11
7553
12631
1<>7
1743
2232
128
7400
11544
156
2356
20<»6
89
60000
83928
140
520 11.5805
807 H9527
155 313
FIELD SURV ACT TAKEN TO DETERM SOURCE COMP FOR NON-PT, SRC
COMMITMENT
TO DATE
PERCENT TfJ DATE
10
22
220
15000
20836
139
0
0
0
2028
3M
1»
950
29h5
312
90
97
108
5925
7697
130
311
273
88
0
0
0
230 245U4
309 32560
134 |33
ENF ACT BY EPA TO ENSIlRf COMP w/NONATTAIN AfjCR'S FflR PT S»C
COMMI TMENT
TO DATE
PERCENT TO DATE
60
72
120
76
|(I9
196
HO
71
89
132
0
0
too
92
9?
56
24
43
61
96
119
51
47
92
uO
43
108
19 695
22 6|6
116 89

-------
                                              U,S,  ENVIRONMENTAL  PROTECTION  AGENCY
                                                 PROGRAM  SUMMARY  REPORT  (FY-76)
                                                    REPORT  DATE Sf.P,  30,  1976
in i AIR - ENSURE FULL TOMPL W/SIP FMTS LIM IN AOCHS PROJ TO EXCEED PRIM NAAQA
01 0? 03 01
NO ENF.AcT BY.Ffl* Tl) ENSURE cUMP W/NONAHAIN AOcR'3 FOR NONPT 8RC
COMMITMENT 5 0 0 88
TO DATE 20 0 0 0
PERCENT TO DATE , 100 000
NO FORMAL INQUIRIES SENT BY EPA
TO DATE 98 100 162 0
NO, FORMAL INUUIRIES SENT BY ALL STATES IN REGION
TO DATE 2325 3252 0 7
NO SOURCE TFSTS OBSERVED OR CONDUCTED BY E?*
TO D«Tt 51 17-12 0
NO. SOURCE TESTS OBSERVED OR CONDUCTED BY ALL STATES IN REGION
10 DATE 209 157 133 12
NO. NOTICES OF VIOLATIONS ISSUED BY EPA
TO DATE 17 32 31 0
NO. NOTICES OF VIOLATIONS ISSUED BY ALL STATES IN REGION
TO DATE 1392 157« 0 50
NO, ABATEMENT ORDERS ISSUED BY EPA
TO DATE 13 , 116 36 0
NO. ABATEMENT ORDERS ISSUED BY ALL STATES IN REGION
TO DATE 153 1573 98 6
NO rIV/c"IM PROc INIT IN NON.ATTAlN AQCRI3 B* E?A
TO DATE 2320
Nn ClV/CpIM PR,jC 1NIT IN N(,N. ATTAIN AQC'RS BY ALL STATES IN REGI0N
TO DATE 21 213 71 1
NO. OF FT SOURCES OF UNKN COMPL STATUS WITH EMISSION STANDARDS--
RUG I ON IX
'Hie one unknown source has since been inspected. Inspection
took place on October 6, 1976. The source has been found to be
in compliance.
AIR 1 - ENSURE FULL COMPLIANCE WITH SIP EMISSION LIMITATIONS IN
AQCR'S PROJECTED TO EXCEED THE PRIMARY NAAQS FOR SO- 2 + TSP
PAST ATTAINMENT DATES- -REGION I
RtGtUNS
05 06 07
0 0 37
0 0 22
0 0 59
119 23 16
1516 252 138
21 29 17
165 98 227
60 16 3
2875 251 1567
29 8 97
121 19 263
300
115 5 72







08 09 10 TOTAL
12 0 1 116
0 0 0 a2
0 0 0 29
35 25 1 881
1 8527 3 16026
18 31 9 211
25 838 |9| 2655
21 22 9 2«|7
50 0186 1509 13761
22 19 13 383
25 50 26 2331
1 2 1 H
3 1670 703 2957






     The number of non-point sources in compliance, in violation
and of unknown compliance status cannot be reported as all State
submittals were unrealistic and could not be considered reliable
data.

-------
                                            U,9, ENVIRONMENTAL PROTECTION AGENCY
                                               PROGHA* SUMMARY DEPORT (FY-76)
                                                  REPURT DATE SEP, 30, 1976
19 PA

Ml) COMP
AIR - IMPLEMENTATION OF

STATF INSPECTION MAINTENANCE
01
AND 9CMED LFGALLY AQOP'D REGS REV'O FOR APPR
COMMITMENT 3
TO DATE 1
PERCENT TO DATE 33
PROGRAMS
02
Z
z
100

03
ie
z
\\

01
0
0
0

05
0
0
0
REGIONS
06
0
0
0

07
a
0
0

08
2
0
0

09
0
0
0

10
0
0
0

TOTAL
27
5
!•»
NO INCR DATES MET FOR INSP MAjNT PLAN PROVISIONS
                   TO DATE                                  2     18      20200100     25

-------
U.S. ENVIRONMENTAL PROTECTION AGENCY
   PROGRAM SUMMARY REPORT (FY-76)
             DATE SEP, so, i<>76
20

NO



NO

NO.

NO

NO,

NO,

2« iIR . iSSURE CUMPLTANCF WITH OTHER TCP MEASURES

COMP ScHfnS, STUDIES ft LEGALLY AOOPTFD RfRS
COMMITMENT
TO DATE
PERCENT TO DATE
INCREMTNAL DATES MET EOR BUS LANE PROVISIONS
TO DATE
EMPLOYfR INCENTIVE PLANS R£V'0 FOR APPR
TO DATE
INVESTS OF EMPLOYER INCENTIVE PLANS
TO DATE
INVESTIGATIONS FOR COMPLIANCE WITH ON STREET PARKING
TO DATE
VAPOR Rec"vr«v INSPECTIONS
TO DATE

01

39
2'J
62

1

0

US

0

0

02

et
77
95

3

150

6

1

74

03

402
94
23
•
3

36

0

0

20

04

0
0
0

0

0

0

0

0

05

21
21
100

0

0

0

1

0
REGIONS
06

36
36
100

0

0

0

0

0

07

6
1
17

0

0

0

0

0

08

3
0
0

1

352

352

0

1

09

0
0
0

0

0

0

0

44

10

3
3
100

1

1

0

1

0

TOTAL

591
256
43

9

539

(103

3

139

-------
                                            11.3. ENVIRONMENTAL PROTECTION AGENCY
                                               PROGRAM SUMMARY REPOHT (FY-76)
                                                  REPORT DATE SEP, 30, 1976
21   2C AIR   - ASSURE COMPLIANCE HITH FUEL ADDITIVE REGULATIONS


                                                          01     0?.
                                  REGIONS

                             05     06     07
                                         OB
                                  09
                                  10  TOTAL
NII (-.AS s«MPLfS TESTED «Y FI^LO/LAB MFTHUH
                   COMMITMENT
                   TO DATE
                   PERCENT TO DATE

NO. NOTICES OF CONTAMINATION ISSUED
                   TO DATE

NO. OF PENALTIES ASSFSSED
                   TO DATE

NO. GENERAL AVAILABILITY ft OTHER VIOLATIONS DETECTED
                   TO DATE
2000   3750   1250   3750   2500   5000   2200   3000   «300   2500  30250
192
-------
U,S, ENVIRONMENTAL PROTECTION AGENCY
   PROGRAM SUMMARY REPORT (FY-76)
      REPORT DATE SEP. JO, J976
22

NO




NO.




NO.



NO.



NO.



NO.



NO,



NO.



3A AIR - FNSURF CONTINUED COMPLIANCE WITH 3JP RFQUIRFMENTS IN EACH STATE

ni 02
03
04
05
REGIONS
06
07
08
09 .
f
10
TOIAL
IOENT PT SOURCES IN FINAL COMP W/EMI33 REG3
START LEVF.L
COMMITMENT
TO DATE
PERCENT TO DATE
IDENT SOURCE DKIERM IN COMP W/SCHED
START LEVEL
COMMITMENT
TO DATE
PERCENT TO DATE
IDENT PT SOURCES OF UNKN COMP STAT
START LEVEL
COMMjTMfNT
To DATE
PT SOURCES OF UNK STATUS REG COMPL
START LEVEL
COMMITMENT
TO DATE
830 1179
1236 1762
92o 1557
75 88
INCREMENTS BY STATE
16 69
85 67,
75 105
8B 157
W/FINAL EMISS REQS BY ST
0 102
0 0
28 29
W/SCH INCREMENTS BY STATE
51 14
0 9
12 8
2029
2544
23U2
90

332
179
219
122

0
0
0

0
0
3
3795
0412
3890
88

•125
188
21tt
IH

56
5
IS

24
0
0
1195
3433
3241
94

333
208
449
216

59
10
39

34
0
15
1024
1475
»73l
117

57
75
97
129

345
256
20

2
2
0
1063
J557
1508
97

247
156
152
96

26J
0
98

0
0
0
492
586
481
82

61
70
44
63

7
0
7

0
0
0
18(1
2137
1999
94

129
166
122
73

52
5
1

16
0
0
496
739
734
99

70
26
55
196

55
0
0

17
0
0
13920
19861
18367
92

|7 69
1226
15}2
125

'37
276
237

158
11
3"
IDENT PT SOURCE OUT OF COM W/FIN EMISS REQ NOT ON SCHF.D BY ST
START LEVEL
COMMI TMENT
TO DATE
338 160
0 . 0
63 <>2
34
0
141
233
87
j9«
299
121
307
156
Ub
61
41
in
30
32
0
81
73
30
45
26
0
12
1396
284
1226
PT SOURCES DETERM OVERDUE IN MTG INC OF PROG IN SCHED RY ST
START LEVEL
COMMITMENT
TO HATE
FIELD SijRv ACTS T0 DF.T SOyRCE COMP
COMMITMENT
TO DATE
PERCENT TO DATE
FIELD SURV ACTS TO.OET SOURCE COMP
COMMITMENT
TO DATE
PERCENT TO DATE
30 88
> 20 12
19 31
STATUS EACH STATE
5301 66550
10557 69910
199 (05
STATUS BY EPA BY STATE
150 B13
202 1075
135 132
ISO
• 72
65

3J90
3100
97

393
299
76
B9
7
58

26302
30620
116

991
1067
(OB
53
36
44

11725
19993
171

2200
2769
126
6«
21
7

JB7S
2400
128

303
307
IIS
30
0
5

14200
21020
146

2350
3236
13fl
5
0
7

3113
3076
99

299
248
63
28
IS
It

60000
B7269
115

400
008
102
56
2
B

1006
1467
146

115
121
105
593
l«S
275

193265
1/.W2
53

0014
9772
122
ANTICIPATED NU iHf ACTS HY f.PA BY STATE



COMMI TMFNT
Tn DATE
PERCENT TO DATE
75 95
98 164
J31 173
100
76
76
405
326
80
100
128
128
68
33
49
61
9fl
121
65
SB
69
40
43
108
65
67
103
109/4
1091
100

-------
                                            U.S. ENVIRONMENTAL PROTECTION AGENCY
                                               PRIJGHAM SUMMARY REPORT (FY-76)
                                                  REPORT DATE SEP, so, 1976
22 3A AIR

NO, FORMAL INN
- ENSURE CONTTNUFD COMPLIANCE WITH SIP REQUIREMENTS IN EACH STATE

i SENT TO ALL SOURCES TO DET COMP STATUS RY
TO DATE
NO. FORM INO SENT TU ALL SOURCES TO DET COMP 3TAT BY EPA
TO DATE
NO. SOURCE TESTS CONDUCTED OR OBSERVED BY EPA
TO DATE
NO. SOURCE TESTS CONDUCTED Ofl OBSERVED BY ALL STATES
TO DATE
NO. NOTICES of
NO. NOTICES OF
NO. ABATEMENT
NO, ABATEMENT
NO, CIVIL/CRI"
NO, ClViL/CRlM
VIOLATION ISSUED BY STATES
TO DATE
VIOLATIONS ISSUED BY EPA BY STATE
TO DATE
ORDERS ISSUED BY STATE
TO DATE
ORDERS ISSUED BY EPA BY STATE
TO DATE
PROCEEDINGS INITIATED BY STATE
TO DATE
PROCEEDINGS iNjT BY EPA BY STATE
10 DATE
01 02 03
STATE
621? 2680 0
BY STATE .
103 445 , 101"
56 20 1»
346 611 133
3671 2269 199
51 42 35
348 2486 96
45 |l9 40
40 292 54
2 3 2
04
not
105
25
1170
HIM
307
348
2?
150
2
REGIONS
05 06 07
2538 277 289
198 25 14
26 33 24
809 127 280
30|0 309 ]617
87 20 4
199 20 246
38 13 81
128 7 271
300

08 09 10 TOTAL
21 8530 33 21686
36 25 7 1061
9 34 21 266
39 745 277 453?
95 0603 J642 10529
26 22 31 625
70 50 49 3914
31 19 36 449
4 1671 659 3476
1 2 1 16
NO. Fll-Ln SURV ACTS TO DHT SOURCE COMP STATUS I-AHI STATI:--
UliGION 11





     The number of Puerto Rican field surveillance actions was
previously reported erroneously.

-------
OUTPUT AIR 3--REGION IV
     Because the reporting requirements, 40 CFR 51.7, allows the
States 45 days after the end of the quarter to report the compli-
ance status of point sources facilities, Output Air 3 data are
3 to 5 months behind actual data.  Current year-end data are
as follows:

NO.  IDENT PT. SOURCES IN FINAL COMPL W/EMISS REGS--REGION IV
     TOTAL     4(f39'
NO. IDENT  SOURCE DETERM  IN COMP W/SCHED--REGION IV
     TOTAL
289
NO.  IDENT  PT  SOURCES  ON  UNKN  STAT W/FINAL  EMISS.REQS  BY
STATE--REGION IV
	TOTAL.46

N0  PT_gniiPTBg_pF UNK STATUS REQ COMPL wysCQNCREHENTS BY
STATE--REGION IV    ~         ~
_	TOTAL       10

NO.  IDENT  PT  SOURCE OUT  OF COM W/FIN  EMISS REQ NOT ON SCHED--
REGION IV
     TOTAL      344
NO.  PT SOURCES DETERM OVERDUE IN MTG  INC OF PROG IN SCIIED BY
STATE--REG ION IV                               ~~~
      TOTAL       79

-------
                                             U.3,  ENVIRONMENTAL PROTECTION AGENCY
                                                PROGRAM SUMMARY REPORT (FY-76)
                                                   REPORT DATE SEP. 30, 1976
23

NO,


X OF

NO.

NO,
NO.
NO.
5H »1H - FNSURF COMPLIANCE KITH NSPS REQUIREMENTS

STATES DELEGATE!) FNF OF NSPS
START LEVEL
COMMITMENT
TO DATE
PERCENT T« DATE
SOURCES SUHJ TO NSP3 OET TO BE IN COMPLIANCE
START LEVEL
COMMITMENT
TO DATE
IDENTIFIED SOURCES SUBJECT TO NSPS
START LEVEL
T() DATE
IDENTIFIED SOURCES 3UBJ TO NSPS IN COMPLIANCE
START LEVEL
TO DATE
FIELD SURVEILLANCE ACTIONS
TO OATE
ENFORCEMENT ACTIONS
TO DATE
01
0
5
5
100
IN EACH REGION
75
BS
28
28
21
24
10
8
02
0
U
2
50
too
100.
98
13
51
13
50
42
10
03
0
2
50
90
95
90
10
62
9
56
B
1
04
0
8
2
25
88
95
90
43
88
38
81
57
5
REGIONS
05
0
6
3
50
82
90
88
17
58
14
51
7
9
06
0
2
0
0
90
98
93
51
107
49
99
41
0
07
0
3
2
67
0
100
97
5
38
0
37
16
0
08
0
6
4
67
100
too
100
3
20
3
20
5
0
09
0
0
0
0
96
9fl
ea
28
16
27
15
23
5
10 TOTAL
2
3
3
100
55
77
64
11
19
6
19
e
a
2
41
23
56


209
487
too
452
217
42
                                 --REGION
                                 	  "~
                                     an.  Oklahoma's  regs  are
                                     tted draft.  Anticipate

  OF SOURCES SUHJ TO  NSPS  CL-T  TO BE IN COMPLIANCE IN EACH
 jTruioTP^UHGlON  IX
     linlorccment actions initiated against  violating sources.
NO. innNTlFIliD SOU RGBS SUBJF.CT TO NSPS--REGION  VI
     Inventory modified re hdqtrs guidance  counti'ng  facilities
vs. sources.

-------
                                       U,3,  ENVIRONMENTAL PROTECTION AGENCY
                                          PROGRAM 8IJMMARY REPORT 
-------
                                            U.S. ENVIRONMENTAL PROTECTION AGENCY
                                               PROGRAM SUMMARY REPORT (FY-76)
                                                  REPORT DATE SEP. 3o, 1976
25   5  AIR   - IHPLfM (IF 3IP3 WHICH PROV FUR THE PREVENT OF SIG DETER OF AIR OtlAL

                                                          01     02     03     04
     REGIONS

05     06     07
                                                                                                           08
                                  09
in  TOTAL
Nfi, SOURCE REVIEWS CARRIED OUT BY EPA
                   START LEVEL
                   TO DATE
 0
It
      NO. SOURCE REVIEWS CARRIED OUT BY EPA--REGION V
           Nine reviews presently underway."
      NO. SOURCE REVIEWS CARRIED OUT BY EPA--REGION VI
           Region VI has reviewed Oklahoma's plan.Oklahoma's regs
      are not equivalent to EPA's.  Texas submitted draft.  Anticipate
      approval of both plans early in FY-77.

-------
U.S. ENVIRONMENTAL PROTECTION AGENCY
   PROGRAM SUMMARY REPORT (FY-76)
      REPORT DATE SEP, 30,  1976
26 6 AIR
- FNSURF COMPLIANCE WITH NfSHiPS HfQUIRfMFNTS
01
02
03
04
05
REGIONS
06

07

06

09


10 TOTAL
NO. STATES DELEGATED ENF OF NESHAP3




NO. SPRAYING




NO. SPRAYING




NO, NEW/EXIST


NO, NEw/EXjST


. START LEVEL
COMMITMENT
TO DATE
PERCENT TO DATE
& OEM OPERS TO BE INVESTiD BY ST»TE3 W/IN »EG
START LEVEL
COMMITMENT
TO DATE
PERCENT TO DATE
& DEMOLITION OPERS TO BE INVESTIGATED BY EPA
START LEVEL
COMMITMENT
TO DATE
PERCENT TO DATE
SOURCES 8IIBJ TO NESHApS REo'D IN FINAL CoMPL
START LEVEL
TO DATE
SOURCES SUBJ TO NESnAPS DET fN FjNAL COMPL
START LEVEL
TO D»TE
i
5
a
no

0
15
3
20

2
18
9
50

65
64

6?
61
0
4
2
50

0
0 .
0
0

32
104
69
66

64
114

56
84
0
3
3
,100

0
0
41
0

0
25
19
76

69
107

69
104
0
7
2
29

0
146
4
3

0
16
9
56

85
120

64
118
0
5
2
40

0
30
20
67

0
78
61
78

137
1S9

137
155
0
2
0
0

a
44
8
IB

22
47
37
79

81
119

61
115
0
1
0
0

0
0
0
0

0
15
9
60

29
24

26
23
0
4
2
50

0
4
0
0

18
0
96
0

15
15

15
15
0
0
0
0

0
0
1
0

0
40
41
103

115
134

106
132
1
2
2
100

0
46
63
137

27
47
33
70

31
41

32
41
2
33
17
52

0
285
140
49

101
390
385
99

711
. 097

672
B4t>
NO. SOURCES 3"RJ T" Np. SNAPS ON WAI^R Of cf>MpLI*NCE


START LEVEL
TO PATE
1
1
0
0
0
0
1
2
0
4
0
0
1
1
0
0
0
2
0
1
3
11
NO. SOURCES SUBJ TO MESHAPS IN COMPL H/WAIVERS OF CllHPL


START LEVEL
TO DATE
1
1
0
0
0
0
1
2
0
4
0
0
0
1
0
0
0
2
0
1
2
II
NO, IDENT SPRAYjNG/DEMOLlTlON OPERATIONS IN EACH «£(! OFFICE


START LEVEL
TO DATE
21
35
1655
3223
3
2
21
14
29
192
50
89
7
10
10
"6
24
41
27
32
1047
3(S8l
NO. iDtNT SPRAYING/DEMOLITION OPFRS, OET TO RE IN COMPL,


NO. INVEST TO

START LEVEL
TO DATE
DET COMPL STATUS H* STATES ft f.PA
TO DATE
12
16

J
1
2

242
3
2

14
9
14

34
22
140

88
48
87

28
7
10

64
10
46

5
8
41

240
27
32

30
147
390

748
NO. ENF ACTIONS UNDERTAKEN BY STATES 11 EPA

TO DATE
3
8
2
0
1
2
2
0
0
1
19

-------
                                            11,3. ENVIRONMENTAL PROTECTION AGENCY
                                               PROGRAM SUMMARY REPORT (FY-76)
                                                  REPORT DATE SEP, 30, J976
26   6  MR   • ENSURE COMPLIANCE W'TH NFSH4P3 REQUIREMENTS                                REGIONS

                                                          01     02     OJ     0«     05     06     07     08     09     10  TOTAL
 AIR 6 - ENSURE COMPLIANCE WITH NESIIAPS REQUIREMENTS--REGION  I
      The number of spraying and demolition operations investigated
 by the States did not meet the TQ commitment since the States did
 not receive the number of notifications projected.




 NO.  SPRAYING 5  DEM ORDERS  TO  BE  INVEST'D  BY  STATES W/IN
 UEG--RE(!lOfryT

     Very difficult  to  investigate  since  basically unaware  of
 proposed activity  beforehand.



 NO. SPRAYING 6  DEMOLITION  ORDERS TO  BE  INVESTIGATED BY' EPA--
 REGION VF          ~~~
     Very difficult  to  investigate  since  basically unaware  of
 proposed activity  beforehand.



 NO. NEW/EXIST SOURCES SUDJ TO NESHAPS PET IN  FINAL COMPL--
 REG]QN II
     Tins docs  not  include compliance status  for sources  in
 New York State.  This status will be reported prior to the
 deadline for Cycle 2 input with the other New York State
 nut-mi* «-«-..-I*	•• -
output commitments.
 NO.  I DEN SPRAYING/DEMOLITION OPERS.  PET TO BE IN COMPL--
 lU-ClON IX
      The list  of major  Federal  sources  has been drastically
 reduced after  extensive data collection indicated the presence
 of many relatively  insignificant  sources on the list.   Simultaneously
 the  compliance status of most of  these  sources  was determined,
 by not being able to  adjust  the TQ number downward,  all the 4th
 quarter and TQ numbers  are in error.

-------
                                            U.S. ENVIRONMENTAL  PROTECTION  AGENCY
                                                PROGRAM  SUMMARY  REPORT  (fY-76)
                                                  REPORT DATF. SEP.  30,  1976
27 7 AIR

NO, fro PT.




NO. FED PT.



NO. FED PT,



NO. FED PT.



NO. FED PT.



- ENSURE COMPLIANCE OF FEDERAL FACILITIES WITH SIP REQUIREMENTS

SOURCES IN COMPLIANCE *ITM SIPS
START LEVEL
COMMITMENT
TO DATE
PERCENT TO DATE
SOURCES OUT OF COMPLIANCE WITH SIPS
START LEVEL
COMMITMENT
TO DATE
SOURCES OUT OF COMPL BUT ON CONSENT OECLAR.
START LEVEL
COMMITMENT
TO DATE
SOURCES IN VIO OF CONSENT DECLARATIONS
START LEVEL
COMMITMENT
TO DATE
SOURCES OF UNKNOWN STATUS
START LEVEL
COMMITMENT
TO DATE
01

31
34
15
44

6
3
2

0
0
0
.
0
0
0

0
0
20 <
02

a
to
IS
150

3
0 .
3

3
3
3

0
0
0

a
0
s
03

10
74
66
, 89

10
26
13

7
13
10

0
1
2

80
0
1
04

24
80
62
78

24
36
30

0
3
1

0
0
0

16
0
24
05

0
9
3
33

25
n
13

0
25
10

0
0
0

9
0
7
REGIONS
06

8
30
33
110

10
4
5

0
5
1

0
0
0

21
0
2

07

1
2
4
200

9
8
0

2
8
h

0
0
0

0
0
0

OB

17
|9
13
68

2
1
0

3
1
1

0
0
0

0
0
0

09

5
45
IS
33

6
20
12

0
5
6

0
2
1

69
6
0

10

14
23
20
87

6
0

-------
                                              U.S.  ENVIRONMENTAL PROTECTION AGENCY
                                                 PROGRAM SUMMARY REPORT (FY-76)
                                                    REPORT OATF. SEP, 30, 1976
2fl
NO,


NO.



NO.


NO.


NO.


NO,

NO.


	 - 	 	 	 - 	
1 PFSTICIOFS - ESTABLISH OPERATIONAL STATE CERTIFICATION PROGRAMS
— — w.» — ^••^•••••••«»»»*»*»«* — •••••••»»»W*»»«»«»«»"-™ — ••*"*i»l*-*"~-*"**™ — ****"*-"*"""""™"*~*
• 01 02 0 3
STATE SETT, 4 Ct'RT PLANS APPROVED
START LEVEL
COMMITMENT
TO DATE i
PERCENT TO DATE
STATES WjTH APPLICATOR CF.HT PROGRAMS
START LEVEL
COMMITMENT
Tf.l DATE
PERCENT TO DATE
STATES W/ACCEPTAHLE PEST LEGISLATION ENACTED
START LEVEL
TO DATE
STATE OnAM CERT PLANS SUBMITTED FOR REVIEW
START LEVEL
Tfl DATE
STATE CEHT PLANS APPR ON CONTlNGENCY OF 3T LEG
START LEVEL
TO DATE
PRIVATE APPLICATORS CERTIFIED
START LEVEL
TO DATE
COMMERCIAL APPLICATORS CERTIFIED BY STATE
START LEVEL
TO DATE

NO. PRIVATE APPLICATORS TRAlNtO BY STATE
START LFVEL
TO DATE
NO.
COMMERCIAL APPLICATORS TRAINED • BY STATE
START LEVEL
TO DATE

0
6
I
17

0
6
63

4


1
6
ACTION

2

0
0

0

0
4423
0
921

0
4
3
75



too





a



rt
34290

0
f
10000
39843
2000
0


6
100


6
67

c
j



t
i

A
14503
Q
10975

0
27613
0
16676
04

8-
5
63


g
100
\
j
7


7
f
i
t

g
21462

16389

0
21706
0
12809
05


2
40
o

2


q

3


0
2

o
0
Q
0

0
19275
< 0
19710
REGIONS
06 07
o
5
5
100
Q

3
60
3
4

o
5

0
2

0
29
o
5864

7500
11623
531
5J36
i
1
{1
1
25
0
4
3
75
2
3


4

0
0

o
11800
0
7580

0
22683
0
8497
»••»*••••<
08
0
6
0
0
0

6
100
4
5

1
6

0
2

0
40
0
900

0
1084
0
1338
09
0
4
3
75
0
s
5
ino
3
11

2
5

0
5

0
0
0
0

0
545
0
4019
10 TOTAL
0
4
4
100
0
a
3
7S
0
u

0
4

0
4

0
2523
0
1819

0
2436
0
1026
3
52
30
5B
0
53
43
81
27
45

20
53

2
29

0
84667
0
45547

17500
151233
2531
70132
   NO.  -STATE  SECT.  4  CERT PLANS APPROVED--REGION V
        FTFUA amendments  hasdelayed plan  approvals.
   NO.  OF  STATB  SliCTION  4  CERTIFICATION PLANS APPROVED--REGION IX
f
    The reason .for the decline of 1 for this output in the last
uarter is because Arizona is,in the process of drafting a letter
o amend the State pla.n. '   '  .

-------
NO. STATES WITH APPLICATOR CERT PROGRAMS--REGION VI
     Arkansas, New Mexico and Texas have programs.   Oklahoma
and Louisiana to have programs approved during 1st  quarter of
FY-77.
  NO  COMMERCIAL APPLICATORS CERTIFIED-BY STATE--REGION  II
       Commercial applicators included with private.   States  do
  not keep separate records.
  NO.  COMMERCIAL APPLICATORS TRAINED-BY STATE--REGION  II
        Commercial  applicators  included with private.STates do
  not  keep  separate  records.

-------
U,3, ENVIRONMENT*!. PROTECTION AGENCY
   PROGRAM SUMMARY REPORT (fY-76)
      REPORT DATE SEP. so, 1976
29

NO.



NO.



NO.

NO.

NO.

NO.

NO.

NO.
2A PESTICIDES - ENSURE PROPER USE AND APPLICATION OF PESTICIDES
01 02
EXPERIMENTAL USE INVESTIGATIONS
COMMITMENT 36 32
TO DATE 36 18
PERCENT TO DATE 100 56
USE A^D RE-ENTRY INVESTIGATIONS CONDUCTED
COMMITMENT 120 61
TO DATE 123 88
PERCENT TO DATE 103 1«4 .
FpA ISSUED EXp USE PERMITS MfjNlTQRED
TO DATE 29 23
CIVIL ACTION WARNINGS (SEC 10) ISSUED
TO DATE 1 0
civiu ACTION COMPLAINTS ISSUED
TO DATE 0 0
CRIMINAL PROSECUTIONS
TO DATE 0 0
STOP SALEfUSE, OR REMOVAL ORDERS R SEI7URES
TO DATE 0 , 0
EXPERIMENTAL USE INVESTIGATIONS- -REGION VI

03

85
95
112

100
109
109

44

0

0

0

0


04

129
128
99

275
415
151

98

23

0

0

5


05

55
58
105

95
95
too

292

9

0

0

1

REGIONS
06

40
7
18

120
103
86

3

9

0

0

6


07

50
S3
10(1

es
93
109

26

26

0

0

3


08

12
16
133

38
S3
139

16

1

0

0

6


09

10
10
too

too
too
100

20

7

1

0

5


10

12
13
toe

165
220
133

13

to

0

0

0


TOTAL

461
"33
94

1159
1399
121

564

86

1

0

26

Kcgion VJ lias redirected emphasis to "use and re-entry"
activities which require immediate attention.
NO.
USE AND RE-ENTRY INVESTIGATIONS CONDUCTED- -REGION VI










-------
11,8, f.NVIRONMENTAL PROTECTION  AGENCY
   PROGRAM SUMMARY Rf.PORT  (FY-76)
      REPORT DATE SEP,  10,  1976
10

NO,




NO.


an PtsTTcmrs - ASSIST STATES IN THF PRFP OF SPECIAL LOCAL

STAIF SUBMISSIONS FUR CERT TO RpRISTER PESTS
START LEVEL
COMMITMENT
TO DATE
PERCENT T" DAfE
STATE REGISTRATIONS UNDER SEC, 2«C
START LEVEL
TO DATE
01

0
6
li
67

0
2
NEEDS
02

0
J
3
too

0
(1 .
RESIST
03

0
6
5
83

0
17
PLANS
04

0
A
7
68

0
«7

OS

0
5
5
100

0
6
Rf RUINS
06

0
5
5
too

0
25

07

0
(1
(1
too

0
s

OB

0
3
5
167

0
1

09

1
4
a
100

0
190

10

0
3
3
too

0
60

TOTAL

1
17
US
96

0
357

-------
U.S, ENVIRONMENTAL PROTECTION AGENCY
   PROGRAM SUMMARY HEPOKT (Fy-76)
      REPORT DATE SEP, 30, |976
31

NO,
NO.
NO.
NO,
NO.
NO.
NO,
NO.
NO,
NO.
NO,
NO.
NO.
NO,
2C PESTTCIUFS - CONT EFFECTIVE REGIONAL FOCUS ON INnUSTRY
!
.
PRODUCER ESTABLISHMENTS INSPFCTFO
COMMITMENT
' TO DATE
PERCENT TO PATE
IMPORT INVESTIGATIONS
COMMITMENT
TO DATE
PERCENT TO 0*TE
MARKETPLACE INVESTIGATIONS
COMMITMENT
TO DATE
PERCENT TO HATE
PRODUCTS REVOKED AT ESTABLISHMENTS
TO DATE
CIVIL ACTIONS RESULTING FROM E3T OF IN3P ACTIVITIES
TO DATE
CRIMINAL PROSECUTIONS
TO DATE
STOP SALE»USE OR REMOVAL ORDERS ft SEIZURES
TO DATE
PRODUCER ESTABLISHMENT SAMPLES COLLECTED
TO DATE
PORT VISITS MADE FOR INSPECTIONS
TO DATE
IMPORT ENTRIES REVIEWED
TO DATE
OF IMPORT DETENTIONS
TO DATE
IMPORT SAMPLES COLLECTED
TO DATE
MARKETPLACE SAMPLES COLLECTED
TO DATE
CIVIL ACTIONS
' ' TO DATE
01
90
107
119
60
85
142
mo
532
130
297
7
0
1
170
25
65
6
16
105
7
COMPL
02
250
242
97
225
196
87 .
110
102
129
633
30
0
7
58q
207
3362
116
50
98
39
W/REG REO
03
198
203
103
t 60
113
ins
212
310
148
631
31
0
10
35U
67
106
8
19
75
6
01
390
U66
119
50
34
68
1000
1102
110
385
37
0
4tt
507
38
118
6
15
166
22
05
400
634
159
35
34
97
140
168
120
551
29
0
34
493
37
235
8
18
293
17
REGIONS
1)6
275
320
116
60
54
90
565
708
125
568
24
0
IB
635
43
484
5
38
97
13

07
240
251
105
25
27
108
125
453
362
478
54
0
6
753
26
164
0
16
131
30

06
37
«1
111
2
2
too
125
145
116
114
5
0
11
24
3
«l
4
1
23
4

09
250
261
104
15
15
too
85
85
100
581
28
0
5
21«>
6
405
II
11
73
22

10
160
160
too
12
12
100
25
26
104
136
10
0
0
126
20
31
0
it
30
3

TOTAL
2290
2685
117
544
572
105
2797
3675
131
4568
255
0
136
s«6a
472
50|l
166
2|B
1091
165

-------
                                            U,S,  ENVIRONMENTAL PROTECTION AGENCY
                                               PROGRAM SUMMARY REPORT  (FY-76)
                                                  RF.PDRT OATE SFP,  JO,  1976
31

NO,
NO.
NO.
NO.
NO.
2C PFSTTCIOFS * CONT EFFFCTIVF REGIONAL FOCUS o

CRIMINAL PROSECUTIONS
TO DATE
STOP SALE/USE OR REMOVAL ORDERS R SEIZURES
TO DATE
RECALLS INITIATED
TCI DATE
WARNINGS (SEC, 9) ISSUED
TO r>AT£
SAMPLES c"LLECT£D RETIRING CHEM ANALYSIS
TO HATE
N INDUSTRY COMPL W/REG REQ REGIONS
01 02 03 0
-------
U.S, ENVIRONMENTAL PROTECTION AGENCY
   PROGRAM SUMMARY REPORT (FY-76)
      REPORT PATE SEP. 3<>, 1976
32

NO.




NO.

NIJ.

NO

NO.

SA PFSTTCIOFS - OFVFLOP CO"PFHATIVF FNFOHCF.MFNT ARR?

STATE COOPERATIVf FNF AGRFFMFNTS IN FFFFCT
8TART LEVEL
COMMITMENT
TO DATE
PERCENT TO DATE
USE AND RE-ENTRY INVESTIGATIONS
TO DATE.
MAJOR ENF ACTS, CIVIL COMPS,CRIM PR03EC,CIV WARNINGS
TO DATE
STOP SALE, USE, OP REMOVAL ORDERS 11 SEIZURES
TO DATE
RECALL ACTS TAKEN BY STATES AT EPA REQUEST
TO DATE
:FMf.NT3
01

0
3
1
33

6ft

0

0

0
WITH STATES
02 03

0 0
3 1
cj g
133 ,200

U 0

0 0

0 0

0 0

04

0
3
2
67

352

to

0

0

05

0
2
1
50

19

1

2

0
REGIONS
06

0
1
1
100

0

0

0

0

07

0
2
2
too

93

1

2

0

08

0
1
1
too

210

5

0

0

09

0
3
4
133

25

6

8

0

10

2
3
2
67

196

7

1

0

TOTAL

2
22
?0
91

967

30

13

0

-------
                                            U,3, ENVIRONMENTAL PROTECTION AGENCY
                                               PROGRAM SUMMARY REPORT (FY-76)
                                                  REPORT DUE SEP, 30, 1976
33 SB PESTICIDES - ASSIST STATES IN DEVELOPMENT OF

NO. STATF PLANS »PPR FOR EXPFR USE PERMIT PROP,
START LEVfL
COMMITMENT
TO DATE
PERCENT TO DATE
EXPERIMENTAL USE
01
0
0
0
0
02
0
2
0
0
PROGRAMS
03
0
5
0
0
04
0
e
0
0
OS
0
u
0
0
REGIONS
Ob
0
3
0
0

07
0
0
0
0

08
0
1
0
0

09
1
0
0
0

10
0
2
0
0

TOTAL
1
25
0
0
NO. STATE USE PERMITS ISSUED UNDFH SEC
                   TO DATE
NO.  STATE PLANS APPU FOR EXPER USE PERMIT PROG--REGION V
      Regulations not yet promulgated.
NO.  STATES PLANS API'R FOR EXPER USE PERMIT rROG--KnC10N VI
     Regulations not promulgated for Sec.  5 (f) .

-------
U.3, ENVIRONMENTAL PROTECTION AGENCY
   PROGRAM SUMMARY REPOHT (FY-76)
      REPORT OATE SEP. 30, 1<>76
3u 3c PESTTCIOFS - DEVELOP OTHER COOPERATIVE USE CONTROL PROGRAMS

NO, STATES w/FORMALIZEO ACCIDENT CONTROL PROG
START LEVEL
COMMITMENT
TO OATE
PERCENT TO DATE
01
0
0
0
0
02
3
a
a
100
03
0
1
0
0
00
2
7
n
57
OS
0
1
1
too
REGIONS
06 07
5 U
5 a
5 
too

09
3
il
a
100

10
(1
0
a
100

TOTAL
27
36
32
69

-------
                                              U,3,  ENVIRONMENTAL PROTECTION AGENCY
                                                 PROGRAM SUMMARY REPORT  (FY-761
                                                    REPORT DATE SEP,  JO,  1976
35 1 FI8 - ENVIRONMENTAL HFVIEW OF OTHfR FEDERAL AGENCIES' EI33

x DRAFT FIS'S RF.vn WITH PRF-SUBMISSION LIAISON
8TART LFVEL
COMMITMENT
TO DATE
X OF ElS'S RF.VJEWED ON TIME
START LEVEL
COMMITMENT
TO DATE
X FINAL FIS'S REVIEWED W/EFFECTIVE F.PA FOLLOW-UP
START LEVEL
COMMITMENT
TO DATE
NO. DRAFT EIS'S REVIEWED
START LEVEL
TO DATE
NO. DRAFT EIS'S REViD WITH PRE-EI3 LIAISON
START LFVEL
TO DATE
NO. DRAFT FIS'S REVIEWED OH TIME
START LF.VFL
TO DATE
NO. FINAL EIS'S REv'O RATED ER.EU OH 3 AT DRAFT STAGE
STA»T LEVEL
T0 DATE
NO. FINAL Elfl REV'° "ATED fR^Url AT DRApT H SAT MOD'D
START LEVEL
TO DATE
% DRAPT HISS REV'D WITH PRE-SUBMISSION LIAISON- -UliGION
Not enough contact with Federal Agencies.
i FINAL KISS REVIEWED W/liFPliCTIVE EPA FOLLOW-UP-REGION
There were only 6 in this category and 2 were proh
NO. I1RAFT niSS REV'D WITH PRE-EIS FOLLOW-UP- -REGION X
01

50
53
52

92
95
93

9fl
95
100

130
160

65
83

120
110

90
.97

ee
95
IX

IX
iem cases.

02

60
60
6i*f ^ w MIV •• i,u i .1. vsii v L uuv.i' nii/c if  1 j / j »  Ul/\ ;
will be apparent  in  future EISs from these Agencies.

-------
U,3, ENVIRONMENTAL PROTECTION AGENCY
   PROGRAM SUMMARY REPORT (FY-76)
      REPORT DATE SEP, 30, 1976
16

NO.



NU



NO.

NO.

HO.

NO.

NO.

NO.

NO.

NO.

Nf).

| SOLID WiSTt - DEV I IMPLKM COMPLEM ST R fft) 3TH»T TO UPRR«nF. ST

STATE STRATEGIES FOR CONTROL OF DISPOSAL SITES
COMMITMENT
TO DATE
PERCENT TO DATE
STATE 3TRAT3 FfJR HAZ WASTE DIgP CONT DE V'D/SUBMl TIED
COMMITMENT
TO PATE
PERCENT TO DATE
COMPLETED STATUS RPT3 ON LEGISLATION
TO DATE
COMPLETED STATUS RPTS o^ ^AC/LAND DISP SITE APPR PR(IC
TO DATE
COMPLETED STATUS RPTS ON REGS & PROCEDURES
TO DATF
COMPLETED STATUS HPTS ON ADEQUACY OF RESOURCES
TO DATE
STATES F0« WHICH RECOM RPTS HAVE BEEN ISSUED
TO DATE
STATES UPGRADING LEGISLATION
TO DATE
STATES UPGRADING FAC/LAND DISP SITE APPR PROCESS
TO DATE
STATES UPGRADING REGS & PROCEDURES
TO DATE
STATES UPGRADING RESOURCES
TO DATE
01

6
5
93

6
5
83

6

6

6

6

0

0

, 0

0

0
02

3
3
100

3
3
100 .

4

4

4

a

u

1

0

2

3
SW PROGS
03

4
2
50

1
1
too

1

1

1

0

0

1

1

1

1
04

6
6
too

b
6
too

6

6

6

b

b

1

1

2

1
05

b
6
too

6
b
too

b

b

b

b

0

5

b

b

3
REGIONS
06

3
3
too

3
3
too

3

3

3

3

0

3

0

3

4

07

3
4
133

4
a
too

4

4

4

4

4

0

0

0

0

08

b
b
too

6
b
too

b

b

6

b

0

0

3

Z

I

09

5
5
too

2
2
too

b

b

b

b

0

3

3

3

3

JO

3
3
too

3
3
too

4

a

4

4

4

2

t

1

1

TOTAL

45
41
96

40
3<>
98

4b

06

06

45

I"

16

1*

20

|7

-------
                                           U.8, ENVIRONMENTAL PROTECTION AGENCY
                                              PROGRAM  SUMMARY HEPOHT  (FY-76)
                                                 REPORT OATF SEP,  30,  \
57

NO,



NO,



? SOLID WASTE - IMPLEM A FED FAC STRAT FOR (

FFD FACTI.ITIFS STRATFfiY OF.VELUPFD
COMMlTMfNT
Til DATE
PERCENT TO DATE
FED FACILITIES STRATEGY IMPLEMENTED
COMMITMENT
TO DATE
PERCENT TO DATE
:OMPL W/SECT 20
01

1
0
0

1
0
0
9 11 211
02

1
1
too

I
1
100
OF S*D
0)

J
I
too

1
0
0
ACT
0«

1
2
200

1
2
200

OS

I
0
0

1
0
0
REGIONS
06

1
1
too

1
1
100

07

a
0
0

a
0
0

06

t
1
too

I
I
too

09

4
tt
100

J
3
100

10

1
1
too

0
0
0

TOTAL

l<>
It
69

11
e
57
NO. FED FACILITIES STRATEGY DEVELOPED--REGION V
     Stmtcgies could not be developed because baseline data not
completed.
NO. FED FACILITIES STRATEGY IMPLEMENTED--REGION V
     Nothing implemented because no strategies completed.

-------
                                             U.S.  ENVIRONMENTAL PROTECTION AGENCY
                                                PROGRAM SUMMARY REPORT (FY"76)
                                                   RfPflRT  DATE SEP, JOr 1976
38

NO,
I RADIATION - 3UPPOHT THE DEVELOPMENT OF

ACCEPTABLE PLANS COMPLETED
START LEVEL
COMMITMENT
TO HATE
PERCENT to DATE
STATE EMERKF.NCY RESPONSE
0)
0
3
ISO
02
2
5
5
100
PLANS
03
2
a
50

ou
0
4
0
0

05
0
5
0
0
REGIONS
06
0
t
1
too

07
0
1
0
0

08
2
6
'1
67

09 10 TOTAL
23 ||
2 a 21
100 |00 62
NO. ACCUPTAin.H PLANS COMPLETED--RKGION  V
     Six plnns completed, liowcver, not  yet  appro veil by NKC.

-------