PB98-964604
                                EPA 541-R98-060
                                October 1998
EPA Superfund
      Record of Decision:
      Idaho National Engineering Lab
      (USDOE) OU8-08
      Idaho Falls, ID
      9/29/1998

-------
                                         September 30, 1998
            %>
                                       STATE OF IDAHO

                                       DIVISION OF
                                       ENVIRONMENTAL QUALITY
                                  m?-
    Final  Record of Decision
    Naval Reactors Facility
              Operable Unit 8-08
Idaho National Engineering and Environmental Laboratory
               Idaho Falls, Idaho

-------
Final Record of Decision
 Naval Reactors Facility
   Operable Unit 8-08
     September 30, 1998
       Prepared for the
  U.S. Department of Energy
Pittsburgh Naval Reactors Office
     Idaho Branch Office
       P. O. Box 2469
 Idaho Falls. Idaho 83403-2469

-------
Intentionally Blank Sheet

-------
                                      PART I
              DECLARATION OF THE RECORD OF DECISION
SITE NAME AND LOCATION

       Naval Reactors Facility, Waste Area Group 8
       Operable Unit 8-08
       Idaho National Engineering and Environmental Laboratory
       Idaho Falls, Idaho

STATEMENT OF BASIS AND PURPOSE

This decision document presents the selected remedial actions for nine sites in Operable Unit
(OU) 8-08 at the Naval Reactors Facility (NRF) located on the Idaho National Engineering and
Environmental Laboratory (INEEL).  NRF has been designated as Waste Area Group (WAG) 8,
which is one often WAGs at the INEEL identified by the U.S. Environmental Protection Agency
(EPA) Region 10, the Idaho Department of Health and Welfare (IDHW), and the U.S.
Department of Energy (DOE) in the Federal Facilities Agreement and Consent Order (FFA/CO).
These remedial actions were selected  in accordance with the Comprehensive Environmental
Response, Compensation, and Liability Act (CERCLA), as amended, and to the extent
practicable, the National Oil and Hazardous Substances Pollution Contingency Plan (NCP).
This document also presents the decision of performing no remedial action for 55 additional
sites at WAG 8.  The decisions made in this document are based on information in the
Administrative Record file for NRF.

The EPA and IDHW concur with the selected  remedial actions for the nine sites of concern and
the no remedial action decision for the  55 remaining sites.

ASSESSMENT OF THE SITE

The FFA/CO Action Plan describes OU 8-08 as the WAG 8 Comprehensive Remedial
Investigation/Feasibility Study (RI/FS) and includes several potential radiological sites. There
have been nine operable units and 87 sites identified at NRF.  Each operable unit contains a
site or group of sites with similar characteristics. With the exception of 18 radiological sites and
two post-RI/FS new sites, each site has been  investigated under a previous assessment.
These previous assessments evaluated the sites individually without respect to their proximity to
other sites.  Previous decision documents have been issued for 23 of the 87 sites. Decisions for
the remaining  64 sites are provided in this Record of Decision.  One purpose of the
Comprehensive RI/FS was to thoroughly investigate 18 potential radiological sites that were not
previously investigated. Another purpose of the Comprehensive RI/FS was to assess the
potential cumulative,  or additive, effects of all  identified sites at NRF on human health and the
environment including potential impacts to the groundwater. The 23 sites with previous decision
documents were included in the comprehensive assessment to ensure the specified action or
no action delineated in the decision document remains protective of human health and the
environment from a cumulative perspective.

Thirteen of the 23 sites addressed by previous decision documents were not part of an operable
unit and were  determined to be no action sites under a Consent Order and Compliance
Agreement (COCA) which preceded the FFA/CO. Ten other sites in OUs 8-05, 8-06, and 8-07
were addressed under a previous Record of Decision. The Comprehensive RI/FS determined
that the decisions made for the 23 sites were  appropriate and no additional human health or
environmental concerns exist from a cumulative perspective.

                                         iii

-------
This Record of Decision addresses 64 sites by providing selected remedial actions for nine sites
and recommending no remedial action for 55 sites. Fifty-five sites present no risk or an
acceptable risk to human health or the environment, and therefore do not require a remedial
action. The no remedial action sites are identified as follows: NRF-03, 06, 08, 33, 40, 41, and
53 in OU 8-01; NRF-09, 37, 38. 42, 47, 52A, 52B, 54, 55, 61, 64, and 68 in OU 8-02; NRF-10,
15, 18A,  18B, 20, 22, 23, 45, and 56 in OU 8-03, NRF-28, 29, 31, 44, 58, 62, 65, 69, 70, 71, 72,
73, 74, 75. 76, and 77 in OU 8-04; NRF-02. 13, 16, 32, 43, 66, 79, and 81 in OU 8-08, OU 8-09;
and NRF-82 and 83 which are not included in an OU. Actual or threatened releases of
hazardous substances from nine sites, if not addressed by implementing the response actions
selected in this Record of Decision, may present an imminent and substantial endangerment to
human health and the environment.  These sites are NRF-11, 12A, 12B, 14, 17, 19, 21 A, 21B,
and 80 in OU 8-08.

DESCRIPTION OF REMEDY

Operable Unit 8-08 consists of 18 potential radiological sites and the sites addressed in the
comprehensive assessment of all identified sites at NRF.  The assessment of Operable Unit
8-08 was accomplished in the NRF Comprehensive RI/FS. The RI/FS tasks were to thoroughly
investigate 18 sites not previously evaluated (radiological areas including one OU  8-03 site) and
to comprehensively assess the cumulative risk posed by all NRF sites. The site assessments
for the 18 radiological areas resulted in the identification of nine sites of concern. The
comprehensive assessment included all sites at NRF and did not identify any additional sites of
concern.  Twenty-three of the 87 identified sites at NRF were addressed in previous decision
documents, therefore, this Record of Decision addresses decisions made for the remaining 64
sites. Of the 64 sites, 55 do not require additional action. Forty-three of the 55 sites are
recommended for No Action and the other 12 of 55 sites are recommended for No Further
Action. A No Action decision indicates the sites have no source present or a source is present
at a level with an acceptable human health and environment risk for unrestricted use. A No
Further Action decision indicates the site has a source or potential source present that does not
have an exposure route available under current site conditions.  Because the No Further Action
decision potentially results in hazardous substances remaining onsite above risk-based levels, a
CERCLA review will be conducted within five years after commencement of final remedial
actions at NRF to ensure that the No Further Action decision remains effective.

For the protection of human health and the environment, remedial action objectives and goals
were developed for the nine sites of concern. The remedial action objectives, associated goals,
and the general actions necessary to meet the objectives and goals are as follows:

•     Soil contaminated with cesium-137 greater than  16.7 picocuries per gram (pCi/g) will be
      excavated and/or covered with an engineered cap to prevent external gamma radiation
      exposure from exceeding an excess cancer risk  of 1 in 10,000 for the future 100-year
      residential receptor.
•     Soil contaminated with strontium-90 greater than 45.6 pCi/g will be excavated and/or
      covered to prevent ingestion of soil and food crops from exceeding an excess cancer
       risk of 1 in 10,000 for the future 100-year residential receptor.
•      Soil contaminated with lead greater than 400 parts per million (ppm) will be excavated
      and/or covered to prevent direct contact with lead contaminated soil.
•     To prevent the release of contaminated soils, an adequate cover will be used to inhibit
      erosion by natural processes and biotic intrusion by resident plant or animal species.
•      Contaminated soil will be excavated and/or covered, as outlined above, to  prevent
       exposure to contaminants of concern that may cause adverse effects on resident
       species populations.

                                          iv

-------
In order to meet the objectives and goals for the protection of human health and the
environment, the selected remedy for the nine sites of concern consists of limited excavation,
disposal, and containment. The major components of the selected remedy include:

•      Excavating contaminated soil above remediation goals and debris from six of the nine
       sites;
•      Consolidating the excavated soil at one site (S1W Leaching Beds);
•      Disposing of radiological, non-hazardous debris to an INEEL disposal facility or an
       appropriate off-site (away from INEEL) disposal facility and, if necessary, disposing of
       radiological, hazardous debris as a mixed waste per the INEEL Site Treatment Plan;
•      Constructing engineered covers primarily of native earthen materials in two areas that
       would cover the three sites not excavated, which includes the site where soil was
       consolidated.  Cover materials will be determined in the Remedial Design/Remedial
       Action Work Plan;
•      Radiation surveys and soil sampling during excavation;
•      Soil and groundwater sampling to monitor any potential releases from the covered
       areas;
•      Periodic inspection and maintenance of covers to ensure their integrity;
•      Establishing fencing or other barriers and land use restrictions.

The possibility exists that contaminated environmental media not identified in the FFA/CO or in
this comprehensive investigation will  be discovered in the future as a result of routine
operations, maintenance activities, and decontamination and dispositioning activities at NRF.
Upon discovery of a new contaminant source by DOE, IDHW, or EPA, the contaminant source
will be evaluated and appropriate response actions taken in accordance with the FFA/CO.

STATUTORY DETERMINATION

The selected remedy for the nine sites of concern is protective of human health and the
environment, complies with Federal and State requirements that are legally applicable or
relevant and appropriate to the remedial actions, and is cost effective. This remedy utilizes
permanent solutions;  however, it does not satisfy the statutory preference for treatment as a
principal element of the remedy. Treatment was found to be ineffective, difficult to implement,
and/or not cost effective. The contaminated soils can be reliably contained at NRF.

Because this remedy may result in hazardous or radiological substances remaining on site
above risk-based levels, a review will be conducted within five years after commencement of
final remedial actions to ensure that the remedy continues to provide adequate protection of
human health and the environment.

The agencies agree that no remedial action be taken for 55 of the 64 sites. For 12 of the  55
sites, where no action is being taken  because an exposure route is not present under current
site conditions (No Further Action decision), the site conditions will be reviewed at least every
five years to ensure that performing no action remains protective of human health and the
environment. For the 43 of 55 sites with a  No Action decision, follow-up reviews are not
required.

-------
Intentionally Blank Sheet
          VI

-------
                                   Signature Sheet

Signature sheet for the Record of Decision for Operable Unit 8-08, located in Waste Area
Group 8, Naval Reactors Facility at the Idaho National Engineering and Environmental
Laboratory, between the U.S. Department of Energy and the Environmental Protection Agency
with concurrence by the Idaho Department of Health and Welfare.
Chuck Clarke, Regional Administrator                   Date
Region 10
U.S. Environmental Protection Agency
                                         VII

-------
Intentionally Blank Sheet
          VIII

-------
                                  Signature Sheet

Signature sheet for the Record of Decision for Operable Unit 8-08, located in Waste Area
Group 8, Naval Reactors Facility at the Idaho National Engineering and Environmental
Laboratory, between the U.S. Department of Energy and the Environmental Protection Agency,
with concurrence by the Idaho Department of Health and Welfare.
                ^^bsithur/  A
-------
Intentionally Blank Sheet

-------
                                   Signature Sheet

Signature sheet for the Record of Decision for Operable Unit 8-08, located in Waste Area
Group 8, Naval Reactors Facility at the Idaho National Engineering and Environmental
Laboratory, between the U.S. Department of Energy and the Environmental Protection Agency,
with concurrence by the Idaho Department of Health and Welfare.
Theron M. Bradley, Manager        i                   Date
U.S. Department of Energy
Naval Reactors Idaho Branch Office
                                         XI

-------
Intentionally Blank Sheet
           XII

-------
                                  Table of Contents

PART I DECLARATION OF THE RECORD OF DECISION	iii

     Site Name and Location	iii

     Statement of Basis and Purpose	iii

     Assessment of the Site	~:	iii

     Description of Remedy	iv

     Statutory Determination	v

Table of Contents	xiii

List of Tables	xvii

List of Figures	xix

Acronyms	xxi

PART II DECISION SUMMARY	1

1.0  Site Background	1

  1.1   Idaho National Engineering and Environmental Laboratory	1
  1.2   Naval Reactors Facility	1
  1.3   Physical Characteristics	2
  1.4   Ecological Characteristics	3
  1.5  Archeological and Historical Characteristics	4

2.0  Summary of CERCLA Activities at NRF	5

  2.1   CERCLA Background at NRF	5
  2.2   CERCLA Investigations	5
  2.3   Summary of Past CERCLA Decisions	8
  2.4   Summary of Past CERCLA Response Actions	8
  2.5   Scope and Role of the NRF Comprehensive RI/FS	8
  2.6   Purpose of this  Record of Decision	13

3.0  Summary of Site Characteristics	14

  3.1   Site Characteristics (Previous Investigations)	14

    3.1.1  Operable Unit 8-01	14
    3.1.2  Operable Unit 8-02	14
    3.1.3  Operable Unit 8-03	16
    3.1.4  Operable Unit 8-04	17
    3.1.5  Operable Unit 8-09	17

  3.2   Site Characteristics (Operable Unit 8-08 Sites)	18

                                         xiii

-------
    3.2.1  Background	18
    3.2.2  OU 8-08 Site Assessments	19

      3.2.2.1   Old Ditch Surge Pond (NRF-02)	21
      3.2.2.2   S1W Tile Drainfield and L-shaped Sump (NRF-11)	21
      3.2.2.3   Underground Piping to Leaching Pit (NRF-12A)	22
      3.2.2.4   SI W Leaching Pit (NRF-128)	23
      3.2.2.5   S1W Temporary Leaching Pit (NRF-13)	24
      3.2.2.6   S1W Leaching Beds (NRF-14)	24
      3.2.2.7   Radiography Building Collection Tanks (NRF-16)	~:	25
      3.2.2.8   S1W Retention Basins (NRF-17)	26
      3.2.2.9   A1W Leaching Bed (NRF-19)	27
      3.2.2.10 Old Sewage Basin (NRF-21A)	27
      3.2.2.11 Sludge Drying Bed (NRF-21B)	28
      3.2.2.12 Sewage Lagoons (NRF-23)	29
      3.2.2.13 S5G Basin Sludge Disposal Bed (NRF-32)	29
      3.2.2.14 Seepage  Basin Pumpout Area (NRF-43)	30
      3.2.2.15 Hot Storage Pit (NRF-66)	30
      3.2.2.16 ECF Water Pit Release (NRF-79)	30
      3.2.2.17 A1W/S1W Radioactive Line near BB19 (NRF-80)	31
      3.2.2.18 A1W Processing Building Area Soil (NRF-81)	31

  3.3  Site Characteristics (New Sites)	31
  3.4  Groundwater Characteristics	32

4.0  Summary of Site Risks	34

  4.1  Individual Site Risk Assessments	34

    4.1.1  OUs8-01, 02, 03, 04, and 09 Site Risk Assessments	34
    4.1.2  OU 8-08 Site Risk Assessments	36

      4.1.2.1   Identification of Contaminants of Potential Concern	36
      4.1.2.2   Exposure Assessment	36

        4.1.2.2.1 Exposure Scenarios	...36
        4.1.2.2.2Quantification of Exposure	37

      4.1.2.3   Toxicity Assessment	38
      4.1.2.4   Risk Characterization	38
      4.1.2.5   Risk Assessment Uncertainties	46
      4.1.2.6   Individual Site Risk Assessment Conclusions	48

    4.1.3  New Site Risk Assessments	50

  4.2  Ecological Risk Assessment	50
  4.3  Cumulative Risk Assessment	51
  4.4  Risk Assessment  Conclusions	52

5.0  Description of Alternatives	54

  5.1  Remedial Action Objectives..!	54
  5.2  Summary of Alternatives	55


                                         xiv

-------
    5.2.1  Alternative 1: No Action	55
    5.2.2  Alternative 2: Limited Action	57
    5.2.3  Alternative 3: Limited Excavation, Disposal, and Containment	58
    5.2.4  Alternative 4: Complete Excavation and Off-site Disposal	61

6.0  Summary of Comparative Analysis of Alternatives	63

  6.1   Overall Protection of Human Health and the Environment	64
  6.2   Compliance with ARARs	65
  6.3   Long-term Effectiveness and Permanence	.—.-.	65
  6.4   Short-term Effectiveness	66
  6.5   Reduction of Toxicity, Mobility, and Volume through Treatment	66
  6.6   Implementability	66
  6.7   Cost	:	67
  6.8   State Acceptance	67
  6.9   Community Acceptance	67
  6.10  Summary	71

7.0  Highlights of Community Participation	72

8.0  Selected Remedy	74

  8.1   No Action/No Further Action Sites	74
  8.2   Selected Remedy for Sites of Concern	76

9.0  Statutory Determination	:	78

  9.1   Protection of Human Health and the Environment	78

    9.1.1  No Action/No Further Action Sites	78
    9.1.2  Limited Excavation, Disposal, and Containment	78

  9.2   Compliance with ARARs	78

    9.2.1  Location-specific ARARs	79
    9.2.2  Action-specific ARARs	79
    9.2.3  Chemical-Specific ARARs	81
    9.2.4  To-be-Considered Guidance	81

  9.3   Cost Effectiveness	81
  9.4   Utilization of Permanent Solutions and Alternative Treatment Technologies to the
       Maximum Extent Possible	82
  9.5   Preference for Treatment as a Principal Element	82

10.0 Documentation of Significant Changes	83
                                          xv

-------
PART III RESPONSIVENESS SUMMARY	85



     Overview	85



     Background on Community Involvement	85



     Summary of Comments with Responses	88



Appendix A	Administrative Record File Index
                                     XVI

-------
                                    List of Tables

Table 1   List of WAG 8 Sites	6
Table 2   Total Controlled Discharges (gallons and curies) to
         Radiological Areas (1953-1979)	19
Table 3   Yearly Controlled Radiological Discharges to Radiological Areas
         (NRF-11, 12, 13, 14, 19)	20
Table 4   Risk Assessment Summary Table for OUs 8-01, 02, 03, 04, and 09	35
Table 5   OU 8-08 Individual Site Risk Assessment Summary	39
Table 6   Contaminants Eliminated as Contaminants of Potential Concern	— •-	45
Table 7   Uncertainties Associated with Individual Site Risk Assessments	46
Table 8   Risk-based Soil Concentrations and Maximum Concentrations
         (pCi/g orppm) of COCs Detected at Sites of Concern	56
Table 9   Cost Summary for Each Alternative	68
Table 10 ARAR and To-be-Considered List	80
                                         XVII

-------
Intentionally Blank Sheet
          XVIII

-------
                                   List of Figures

Figure 1 Location of the Naval Reactors Facility (Waste Area Group 8)	2
Figure 2 Synopsis of CERCLA Sites at NRF	9
Figure 3 CERCLA Sites Associated with NRF	11
Figure 4 Overhead Photograph of Sites of Concern at the Naval Reactors Facility	53
                                        XIX

-------
Intentionally Blank Sheet
        xx

-------
                                    Acronyms

AOC        area of contamination
ARARs      applicable or relevant and appropriate requirements
A1W        Large Ship Reactor Prototype
BB          Butler Building
CERCLA    Comprehensive Environmental Response, Compensation, and Liability Act
COC        contaminants of concern
COCA       Consent Order and Compliance Agreement                 —
COPC       contaminants of potential concern
DOE        Department of Energy
ECF        Expended Core Facility
EPA        Environmental Protection Agency
FFA/CO     Federal Facility Agreement and Consent Order
HEAST      Health Effects Assessment Summary Tables
HQ         hazard quotient
IDHW       Idaho Department of Health and Welfare
INEEL       Idaho National Engineering and Environmental Laboratory
INTEC       Idaho Nuclear Technology and Engineering Center
IRIS        Integrated Risk Information System
NCP        National Oil and Hazardous Substances Pollution Contingency Plan
NHPA       National Historic Preservation Act
NPL        National Priorities List
NRF        Naval Reactors Facility
NRHP       National Register of Historic Places
OU         operable unit
PCB        polychlorinated biphenyl
pCi/g        picocurie per gram
ppb         parts per billion
ppm        parts per million
RAO        remedial action objective
RCRA       Resource Conservation and Recovery Act
RD/RA      remedial design/remedial action
RI/FS       remedial investigation/feasibility study
ROD        record of decision
RWMC      Radioactive Waste Management Complex
SDP        Bettis Atomic Power Laboratory Site Development Plan
SLERA      Screening Level Ecological Risk Assessment
SRPA       Snake River Plain Aquifer
S5G        submarine reactor plant prototype
S1W        Submarine Thermal Reactor Prototype
TRA        Test Reactor Area
UCL        upper confidence limit
USGS       United States Geological Survey
UST        underground storage tank
WAG       Waste Area Group
                                       XXI

-------
Intentionally Blank Sheet
          XXII

-------
                                      PART II
                             DECISION SUMMARY


1.0    Site Background

1.1    Idaho National Engineering and Environmental Laboratory

The Idaho National Engineering and Environmental Laboratory (INEEL) is a government facility
managed by the U.S. Department of Energy (DOE), located 32 miles west of Idaho Falls, Idaho,
and occupies 890 square miles (mi2) of the northeastern portion of the Eastern Snake River
Plain. Facilities at the INEEL are primarily dedicated to nuclear research, development, and
waste management.

The INEEL was established in 1949 as the National Reactor Testing Station by the United
States Atomic Energy Commission as a site for building, testing, and operating nuclear reactors,
fuel processing plants, and support facilities with maximum safety and isolation. In 1974, the
area was designated as the Idaho National Engineering Laboratory to reflect the broad scope of
engineering activities conducted there. The name was changed to the INEEL in 1997 to reflect
the redirection of its mission to include environmental research.

The U.S. Government occupied portions of the INEEL prior to its establishment as the National
Reactor Testing Station. During World War II, the U.S. Navy used about 270 mi2 of the site as a
gunnery range. The U.S. Army Air Corps once used an area southwest of the naval gunnery
area as an aerial gunnery range. The present INEEL site includes all of the former military
areas and a large adjacent area withdrawn from the public domain for use by the DOE. The
former Navy administration shop, warehouse, and housing area are presently the Central
Facilities Area of the INEEL.

The Bureau of Land Management manages the surrounding areas for multipurpose use.  The
developed area within the INEEL is surrounded by a 500 mi2 buffer zone used for cattle and
sheep grazing. Communities nearest to the INEEL are Atomic City (south), Arco (west), Butte
City (west), Howe (northwest), Mud  Lake (northeast), and Terreton (northeast). In the counties
surrounding the INEEL, approximately 45% is agricultural land, 45% is open land, and 10% is
urban.  Sheep, cattle, hogs, poultry, and dairy cattle are produced; and potatoes, sugar beets,
wheat, barley, oats, forage, and seed crops are cultivated. The U.S. Government or private
individuals own most of the land surrounding the INEEL.

Fences and security personnel  strictly control public access to  facilities at the INEEL.  State
Highways 22, 28, and 33 cross the northeastern portion of the  INEEL and U.S. Highways 20
and 26 cross the southern portion.  A total of 90 miles of paved highways pass through the
INEEL and is used by the general public.

1.2    Naval Reactors Facility

The Naval Reactors Facility (NRF) is located on the west central side of the INEEL, as shown
on Figure 1,  approximately 50 miles west of Idaho Falls,  Idaho. NRF was established in 1949
as a testing site for the Naval Nuclear Propulsion Program. The Westinghouse Electric
Company operates NRF for DOE, Office of Naval Reactors.  NRF covers 7 square miles of
which 80 acres are developed and, at various times, was occupied by up to 3,300 people.
Approximately 650 Westinghouse employees and 390 long-term subcontractor employees are
currently working at NRF. The  nearest public roads to NRF are approximately 7 miles west,
10 miles north, and 10 miles south.

-------
                                  To SalmonV.
                                                                       Terreton
                            Naval  Reactors
                            Facility
                                                                      To Idaho Falls
                                                                0   4   8   12
                                                                   Kilometer*
                                                To Blackfoot
           Figure 1. Location of the Naval Reactors Facility (Waste Area Group 8)
NRF consists of three Naval nuclear reactor prototype plants, the Expended Core Facility
(ECF). and miscellaneous support buildings.  Construction of the Submarine Thermal Reactor
prototype (S1W) at NRF began in 1951.  The prototype completed operation in 1989. The
Large Ship Reactor Prototype (A1W) was constructed in 1958 and completed operation in
January 1994.  The submarine reactor plant prototype (S5G) was constructed in 1965 and
completed operation in May 1995. The prototypes were used to train sailors for the nuclear
navy and were used for research and development purposes. The Expended Core Facility,
which receives, inspects, and conducts research on naval nuclear fuel, was constructed in 1958
and is still in operation.

1.3   Physical Characteristics

The INEEL is located on the northeastern portion of the Eastern Snake River Plain, a volcanic
plateau that is composed primarily of volcanic rocks and relatively minor amounts of sediments.
Underlying the INEEL is a series of basaltic flows containing sedimentary interbeds. The Snake
River Plain Aquifer (SRPA) is the largest potable aquifer in Idaho, and underlies the Eastern
Snake River Plain and the INEEL. The aquifer is approximately 200 miles long and 50 miles
wide, and covers an area of approximately 9,600 mi2. The depth to the SRPA at the INEEL
varies from  approximately 200 feet in the northeastern corner to approximately 900 feet in the
southeastern corner. The distance between these extremes is 42 miles.  The EPA designated

-------
the SRPA as a sole-source aquifer under the Safe Drinking Water Act on October 7, 1991.  The
aquifer possesses a high hydraulic conductivity on a large scale because of the presence of
fractures in the basalt. Local hydraulic conductivity may vary greatly due to the heterogeneous
distribution of the physical properties of the aquifer. Groundwater flow in the SRPA is to the
south-southwest at rates between 1.5 to 20 feet per day. In the vicinity of NRF, recharge to the
SRPA occurs by infiltration from the Big Lost River, Little Lost River and Birch Creek, and to a
lesser extent by infiltration due to precipitation.  The average annual precipitation at the INEEL
is approximately 8.5 inches.

NRF is located in the central portion of the INEEL. The land surface at NRF is felatively flat,
with elevations ranging from 4,835 feet towards the distal end of the NRF industrial waste ditch,
which is located approximately one mile north of NRF, to 4,870 feet at the south end of NRF.
NRF is not located in the 100-year flood plain, although parts of the INEEL are on the flood
plain. A flood with a recurrence interval of 5,000 to 8,000 years is capable of inundating NRF.

NRF is located on the alluvial plain of the Big Lost River.  The thickness of alluvial sediment in
the vicinity of NRF ranges from  several inches to in excess  of 60 feet north of NRF. Most of the
soil near NRF is mapped as sandy loam or loess. The loess is an accumulation of wind
deposited silt sized particles. Near surface sediments at NRF consist of alluvial deposits of the
Big Lost River and are composed of unconsolidated fluvial deposits of silt, sand, and pebble-
sized gravel.

A complex sequence of basalt flows and sedimentary interbeds underlie NRF.  The sedimentary
interbeds vary in thickness and  lateral extent and separate the basalt flows that underlie the
surficial alluvium. Samples from basalt flows have been correlated into 23 flow groups that
erupted from related source areas. Known source vents occur to the southwest, along what is
referred to as the Arco volcanic rift zone, to the southeast along the axial volcanic zone, and to
the north at Atomic Energy Commission Butte.  The uneven alluvial thickness and undulating
basalt surface at NRF are common of basalt flow morphology.

The SRPA occurs approximately 375 feet below NRF, and consists of a series of saturated
basalt flows and interlayered pyroclastic and sedimentary material.  Drinking water for
employees at NRF comes from  several production wells located in the central portion of the
facility. Perched water, which sets above the regional water table, occurs in several locations
beneath NRF.  All perched water at NRF is associated with  past or current large volume surface
sources of water. The most significant perched water at NRF is located beneath the outfall  of
the NRF  industrial waste ditch.

1.4    Ecological Characteristics

Fifteen distinctive vegetative cover types have been identified at the INEEL.  The vegetation
cover class at NRF is primarily shrub-steppe flats with sagebrush being the dominant species
and providing the majority of habitat.  No threatened, endangered, or otherwise regulated flora
is known to be present in the NRF area.

The variety of habitats on the INEEL supports numerous species of reptiles, birds, and
mammals. Several bird species warrant special concern because of their threatened status or
sensitivity to disturbance. These species include the ferruginous hawk, bald eagle, prairie
falcon, merlin, long-billed curlew, and burrowing owl. NRF is not known to be within a critical
habitat for endangered or threatened species. The bald eagle, golden eagle, and American
peregrine falcon have been observed, but are not know to frequent the area around NRF.

The Threatened Fish and Wildlife Act does not identify any fish or wildlife species of concern at
NRF. Migratory waterfowl frequent areas of NRF, but the areas with potential remedial actions

-------
do not provide critical habitat. The Idaho Department of Fish and Game lists the ringneck
snake, whose occurrence is considered to be INEEL-wide, as a Category C sensitive species.
NRF is a disturbed industrial area with continuous human activity that contains little suitable
habitat for most endangered, threatened or sensitive species. Potential remedial actions at
NRF are not expected to affect these species, including adverse impacts to migratory waterfowl,
because of the limited area of concern, the previously disturbed nature of the area, and the
expected limited duration of any potential remedial actions.

1.5    Archeological and Historical Characteristics

The area around NRF has  been surveyed for archeological or historical value.  Although some
archeological remnants have been found around NRF, areas with potential remedial actions do
not contain any known archeological or historical items of value. These areas have been
previously disturbed and archeological or historical remnants would not be expected.
Therefore, the regulatory requirements associated with the preservation of antiquities and
archeological materials and sites are not a concern.

The Idaho State Historical Society has identified the INEEL as containing properties potentially
eligible for the National Register of Historic Places (NRHP).  Several structures at NRF may be
eligible for the NRHP and, therefore, would be accorded the  same protection under the National
Historic Preservation Act (NHPA) as if they were listed under the act.  If potential remedial
actions may adversely impact these structures, all applicable requirements established under
the NHPA will be followed for the remedial actions.

-------
2.0    Summary of CERCLA Activities at NRF

2.1    CERCLA Background at NRF

In 1987, a Consent Order and Compliance agreement (COCA) was established between DOE
and the U.S. Environmental Protection Agency (EPA) pursuant to the Resource Conservation
and Recovery Act (RCRA) Section 3008(h). The COCA required an initial assessment and
screening of all solid and/or hazardous waste disposal areas at the INEEL and set up a process
for conducting any necessary corrective actions. In 1989, the INEEL was placed on the
National Priorities List (NPL) of the National Oil and Hazardous Substances Pollution
Contingency Plan (NCP). In 1991, the EPA. Idaho Department of Health and Welfare (IDHW)
and DOE signed the Federal Facility Agreement and Consent Order (FFA/CO), which
superceded the  COCA.  The FFA/CO established the procedural framework and schedule for
developing, prioritizing, implementing, and monitoring response actions at the INEEL in
accordance with the Comprehensive Environmental Response, Compensation, and Liability Act
(CERCLA). This agreement and the associated Action Plan defined the decision process for
conducting assessments and investigations of potential contaminant release areas.

To better manage the environmental investigations under CERCLA, the INEEL was divided into
ten Waste Area  Groups (WAGs), of which NRF was designated as WAG 8. Within each WAG,
all areas with a potential for past contaminant releases were identified as sites. Those sites with
similar releases  and migration pathways were  grouped into operable units (OUs).  A total of 87
known or suspected contaminant release sites, of which 71 were classified in nine OUs, were
identified at NRF as requiring further study under the CERCLA process. Table 1 lists the OUs
and sites associated with NRF.  Four sites, NRF-12, NRF-18, NRF-21, and NRF-52, were each
divided into two  separate sites for evaluation purposes (included in the 87 total sites).  Figure 2
shows the status and decisions made for  each identified OU at NRF. Figure 3 shows the
location of each  site with respect to NRF.  The site numbers shown on  Figure 3 correspond to
the site numbers given on Table 1.  The remainder of this section summarizes the CERCLA
process used to determine the decisions made for each site.

2.2    CERCLA Investigations

Each of the 87 sites required an investigation to determine potential risks to human health  and
the environment. Thirteen of the 87 sites were evaluated prior to the FFA/CO under the COCA
and were not part of an OU.  The remaining 74 sites were assessed as CERCLA-type
investigations. The CERCLA investigations included Track 1, Track 2,  and Remedial
Investigation/Feasibility Study (RI/FS) type investigations. A Track 1 investigation  involved sites
that were believed to have a low probability of  risk and sufficient information available to
evaluate the sites and recommend a course of action.  A Track 2 investigation involved sites
that did not have sufficient data available  to make a decision concerning a level of risk; for these
sites, collection of additional data was necessary. An RI/FS is the most extensive  investigation
and attempts to  characterize the nature and extent of contamination, to assess risks to human
health and the environment from potential exposure to contaminants, and to evaluate cleanup
actions. In addition to the investigations performed for each site through a Track 1, Track 2, or
RI/FS process, a comprehensive RI/FS was performed to assess the potential cumulative, or
additive, effects  to human health and the environment from all sites at NRF.

-------
                           Table 1. List of WAG 8 Sites
Operable Unit   Site Number*1'   Site Name
None













8-01







8-02












8-03









8-04




NRF-04
NRF-05
NRF-07
NRF-24
NRF-25
NRF-27
NRF-30
NRF-34
NRF-39
NRF-46
NRF-57
NRF-60
NRF-67

NRF-03
NRF-06
NRF-08
NRF-33
NRF-40
NRF-41
NRF-63

NRF-09
NRF-37
NRF-38
NRF-42
NRF-47
NRF-52A
NRF-52B
NRF-54
NRF-55
NRF-61
NRF-64
NRF-68

NRF-10
NRF-15
NRF-18A
NRF-18B
NRF-20
NRF-22
NRF-23
NRF-45
NRF-56

NRF-28
NRF-29
NRF-31

Top Soil Pit Area
West Landfill
East Landfill
Demineralizer and Neutralization Facility
Chemical Waste Storage Pad
Main Transformer Yard —
Gatehouse Transformer
Old Parking Lot Landfill
Old Radiography Area
Kerosene Spill
S1W Gravel Pit
Old Incinerator
Old Transformer Yard

ECF Gravel Pit
Southeast Landfill
North Landfill
South Landfill
Lagoon Construction Rubble
East Rubble Area
A1W Construction Debris Area

Parking Lot Runoff Leaching Trenches
Old Painting Booth
ECF French Drain
Old Sewage Effluent Ponds
Site Lead Shack (Building #614)
Old Lead Shack (Location #1 )
Old Lead Shack (Location #2)
Old Boilerhouse Slowdown Pit
Miscellaneous NRF Sumps and French Drains
Old Radioactive Materials Storage and Laydown Area
South Gravel Pit
Corrosion Area Behind BB1 1

Sand Blasting Slag Trench
S1W Acid Spill Area
S1 W Spray Pond #1
S1W Spray Pond #2 and A1W Cooling Tower
A1W Acid Spill Area
A1 W Painting Locker French Drain
Sewage Lagoons
Site Incinerator
Degreasing Facility

A1W Transformer Yard
S5G Oily Waste Spill
A1W Oily Waste Spill
6

-------
Operable Unit  Site Number*1'   Site Name
8-04 (con't)













8-05



8-06






8-07

8-08

















8-09

New Sites



NRF-44
NRF-58
NRF-62
NRF-65
NRF-69
NRF-70
NRF-71
NRF-72
NRF-73
NRF-74
NRF-75
NRF-76
NRF-77

NRF-01
NRF-51
NRF-59

NRF-35
NRF-36
NRF-48
NRF-49
NRF-50
NRF-53

NRF-26

NRF-02
NRF-11
NRF-12A
NRF-12B
NRF-13
NRF-14
NRF-16
NRF-17
NRF-19
NRF-21A
NRF-21B
NRF-32
NRF^3
NRF-66
NRF-79
NRF-80
NRF-81

None

NRF-82
NRF-83

S1 W Industrial Wastewater Spill Area
S1W Old Fuel Oil Tank Spill
ECF Acid Spill Area
Southeast Corner Oil Spill
Plant Service Underground Storage Tank (UST) Diesel Spill
Boiler House Fuel Oil Release
Plant Service UST Gasoline Spill _
NRF Waste Oil Tank
NRF Plant Services Varnish Tank
Abandoned UST's Between the NRF Security Fences
Fuel Oil Revetment Oil Releases
Vehicle Barrier Removal
A1W Fuel Oil Revetment Oil Releases

Field Area North of S1W
West Refuge Pit #4
Original S1W Refuse Pit

Lagoon Landfill #1
Lagoon Landfill #2
West Refuse Pit #1
West Refuse Pit #2
West Refuse Pit #3
East Refuse Pits and Trenching Area

Industrial Waste Ditch

Old Ditch Surge Pond
SIWTile Drain Field and L-shaped Sump
Underground Piping to Leaching Pit
S1W Leaching Pit
S1 W Temporary Leaching Pit
S1W Leaching Beds
Radiography Building Collection Tanks
S1W Retention Basins
A1W Leaching Bed
Old Sewage Basin
Sludge Drying Bed
S5G Basin Sludge Disposal Bed
Seepage Basin Pumpout Area
Hot Storage Pit
ECF Water Pit Release
A1W/S1W Radioactive Line Near BB19
A1W Processing Building Area Soil

Interior Industrial Waste Ditch

Evaporator Bottoms Tank Release
ECF Hot Cells Release Area
(1) NRF-78 was not assigned

-------
The nine OUs at NRF were identified such that each OU contains one or more sites that have
similar releases and involve the same type of CERCLA investigation.  OUs 8-01, 02, 03, and 04
were Track 1 investigation sites. OUs 8-05, 8-06, and 8-09 were Track 2 investigation sites.
OUs 8-07 and 8-08 were RI/FS units. Each site was investigated prior to the NRF
Comprehensive RI/FS with the exception of the OU 8-08 sites and two newly identified sites.
The OU 8-08 sites were investigated as part of the NRF Comprehensive RI/FS. The two new
sites were investigated after the Comprehensive RI/FS using Track 1 investigations.

2.3   Summary of Past CERCLA Decisions

Thirteen of the 87 sites at NRF were evaluated prior to the FFA/CO under the COCA and were
not part of an OU.  These 13 sites were identified as no action sites in the FFA/CO.

In September 1994, a Record of Decision (ROD) was issued for ten sites in OUs 8-05 and 8-06,
Landfill Areas, ?nd OU 8-07, Exterior Industrial Waste Ditch. OUs 8-05 and 8-06 consist of  nine
sites and OU 8-07 is a single site. The decision for six sites in OUs 8-05 and 8-06 (NRF-35, 36,
48, 49, 50, and 59) and OU 8-07 was no action.  The selected remedy for NRF-01, 51, and 53
within OUs 8-05 and 8-06 was the presumptive remedy for CERCLA municipal landfill sites,
which consisted of containment of landfill contents with an engineered cover and monitoring of
soil gas and ground water.

2.4   Summary of Past CERCLA Response Actions

The construction of landfill covers for NRF-01, 51, and 53, as discussed above, were completed
in September 1996. Seven rounds of soil gas and groundwater samples have been collected.
The soil gas and groundwater samples are collected quarterly.

Two small  removal actions were performed at sites NRF-20, A1W Acid Spill Area, and NRF-22.
A1W Painting Locker French Drain.  Soil contaminated with lead was removed from NRF-20 in
August 1994 and sediment contaminated with various  heavy metals was removed from NRF-22
in September 1994. NRF-22 was filled in with concrete eliminating any potential exposure
pathway. NRF-20 and NRF-22 are part of OU 8-03.

2.5   Scope and Role of the NRF Comprehensive RI/FS

Eight of the nine operable units had been investigated prior to the NRF Comprehensive RI/FS.
OU 8-08 represented the last OU to be investigated. The FFA/CO Action Plan describes OU
8-08 as the WAG 8 (NRF) Comprehensive RI/FS. OU 8-08 also included 18 potential
radiological sites that were not assessed in any previous OU. The primary purposes of the NRF
Comprehensive RI/FS were as follows: (1) investigate the 18 radiological OU 8-08 sites, which
were not previously assessed; (2) evaluate the cumulative, or additive, effects of all sites at  NRF
on human  health and the environment; and (3) address the contamination associated with those
sites that had unacceptable, or potentially unacceptable,  risks, which were identified as sites of
concern.

OU 8-08 includes 18 sites that were not previously investigated under other OUs. These sites
were grouped under OU 8-08 because of similar constituents, release mechanisms, and
migration paths. The  OU 8-08 sites represent areas where past controlled releases of low-level
radioactive water were discharged and areas where inadvertent releases to the environment
occurred because of leaks from corroded piping, leaks in underground concrete basins, surface
releases, and cross-contamination of non-radiological systems with radiological systems.

-------
        87
    Tout Sites in
  Waste AreiGroupS
     divided into
9 Operable Units (OU-s)
                                        23
                                   Sites Contained in
                                   Previous Decision
                                     Documents
                                                                     10
                                                                Sites Contained in
                                                                 i Previous ROD
                                                              (OU'il-05, 06,407)
                                                                     13
                                                                Sites as part of the
                                                                Consent Order A
                                                                  Compliance
                                                               Agreement (COCA)
                                        64
                                  Sites with Decisions
                                   Contained in this
                                  Comprehensive ROD
                                                                     44
                                                                 Sites Evaluated
                                                                using Track I or 2
                                                               Investigation Process
                                                                (Oil's 8-01, 02. 03.
                                                                   04. & 09)
       18
  Radiological Sites
 Evaluated using the
Comprehensive RI/FS
     (OU 8-08)
                                                               New Sites Evaluated
                                                               after Comprehensive
                                                               RI/FS using Track 1
                                                                  Investigations
                                                                 (NRF82&83)
                                     42
                                Sites Contained in
                                   Track I or
                              Track 2 Investigations
                                                                                                     2
                                                                                               Removal Actions
                                                                                                 from Track I
                                                                                                Investigations
                                                                                     No Further Action
                                                                                           Sites
                                                                                                                                                    No Further Action
                                                                                                                                                         Site
                                                                                                                                                    No Further Action
                                                                                                                                                         Sites
                                                                                            2
                                                                                     No Further Action
                                                                                           Sites
                                                                Figure 2.  Synopsis of CERCLA Sites at NRF
                                                                                             9

-------
Intentionally Left Blank
       10

-------
                                                            f
Figure 3.  CERCLA Sites Associated with  NRF
                     11

-------
intentionally Left Blank
        12

-------
The primary purpose of the radiological site assessments in OU 8-08 was to evaluate potential
human health risks present at each site through various exposure pathways. Media which could
create potential exposure pathways included soil, air, and groundwater. Contaminants of
potential concern were determined based on risks from exposure pathways such as ingestion of
soil or groundwater and direct exposure to radionuclides. Scenarios for current and future
workers and future residents were considered.

The cumulative, or additive, assessment associated with the NRF Comprehensive RI/FS
addressed the risks posed to human health and the environment from all identified NRF sites
including the radiological areas in OU 8-08. The comprehensive assessment included
reviewing all past site investigations. Sites were screened based on the presence of a
contaminant source at the site. Contaminants of potential concern (COPCs) were identified and
exposure pathways that could result in a cumulative risk were determined. Exposure pathways
were limited to air and groundwater exposure routes, since soil exposure routes were generally
site specific and not cumulative.  The comprehensive assessment also included an ecological
assessment to evaluate potential impacts to ecological receptors.

2.6    Purpose of this Record of Decision

This ROD addresses 64 of the 87 sites identified at NRF. (No action determinations were made
for 13 sites identified in the FFA/CO. A previous ROD addressed ten sites in OUs 8-05, 8-06,
and 8-07.) The Comprehensive RI/FS included 85 sites in the comprehensive cumulative risk
assessment; two new sites (NRF-82 and -83) were identified after the RI/FS, and were
determined to have no effect on the cumulative risk. The NRF Comprehensive RI/FS also
concluded that the remedies selected for the prior 13 No Action sites, and for the ten sites
addressed by a previous  ROD, are protective of human health and the environment from a
cumulative evaluation.

Based on evidence compiled in the NRF Comprehensive RI/FS, 55 of the 64 sites included in
this ROD do not have risks or have acceptable risks to human health and the environment and
require no remedial action.  This includes the two new sites identified after the Comprehensive
RI/FS. These 55 sites have been defined as No Action or No Further Action sites (these
designations are discussed in detail in Section 8.0). Nine of the 64 sites were determined in the
NRF Comprehensive RI/FS to have unacceptable or potentially unacceptable risks that must be
addressed. The nine sites were all radiological areas associated with OU 8-08. These nine
sites of concern were included in a screening, development, and detailed analysis of remedial
action alternatives and resulted in the selection of a preferred alternative.

The remainder of this ROD summarizes the NRF Comprehensive RI/FS, the public's role in the
ROD decisions, and the conclusions and decisions made to remediate the NRF site.
                                         13

-------
3.0    Summary of Site Characteristics

This section provides an overview of the site characteristics for the 64 sites being addressed by
this ROD. The first part of this section discusses the characteristics of sites in OUs 8-01, 02,
03, 04, and 09.  These OUs were investigated through either Track 1 or Track 2 processes prior
to the NRF Comprehensive RI/FS.  The second part of this section discusses OU 8-08 sites and
the two new sites identified after the NRF Comprehensive RI/FS.  These sites are discussed in
more detail because the OU 8-08 sites were investigated as part of the NRF Comprehensive
RI/FS and the new sites were not part of any other OU.  (OUs 8-05, 06, and 07 are not
discussed because previous decision documents have been issued for these Otte.)

A total of 44 sites are associated with OUs 8-01, 02, 03,  04, and 09.  Eighteen sites are
associated with OU 8-08.  NRF-23, Sewage Lagoons, was originally part of OU 8-03 but was
included with the OU 8-08 sites as a recommended conclusion of the site's Track 1
investigation. The two new sites were not associated with any OU.

3.1    Site Characteristics (Previous Investigations)

As stated, OUs 8-01, 02, 03, 04, and 09 were investigated prior to the NRF Comprehensive
RI/FS.  Each OU represents a site or group of sites with  similar releases and migration
pathways. The Track 1 or Track 2 investigation for each of these 44 sites resulted in a
determination that enough information was available to allow a recommended decision without
collecting additional  data.  These OUs and associated sites are briefly explained below.

3.1.1   Operable Unit 8-01

OU 8-01 consists of seven construction rubble sites.  These sites contain rubble from past
construction projects at NRF. Each site was evaluated in a  Track 1 investigation.

NRF-03 is an excavated pit that provided clean fill for construction projects.  The east end of the
pit has been used for disposal of construction debris such as gravel, concrete, metal, and wood.
The southeast portion of the pit was used for 3 months in 1985 for routine nonhazardous
discharge water. The pit has also been used as a gunnery range for security personnel. Soil
sampling showed only slightly elevated amounts of metals.  The risk was estimated to be low
based on the Track 1 evaluation.

NRF-06, 08, 33, 41,  and 63 are rubble piles from past construction projects. The rubble piles
consist primarily of soil, concrete, metal,  and wood. No hazardous source is present.

NRF-40 is a soil pile from an expansion project to enlarge the current sewage lagoons. No
hazardous source is present.

3.1.2  Operable Unit 8-02

OU 8-02 consists of 12 miscellaneous sites that were initially designated as Track 1 low priority
sites. Each site was evaluated  in a Track 1 investigation.

NRF-09 is comprised of three parking  lot runoff trenches that allow water from spring thaws and
heavy rainfall to drain from the parking lot. Soil sampling showed elevated amounts of lead and
silver; however, the risk was estimated to be low based on the Track 1 evaluation.

NRF-37 is the former location of a temporary painting booth and storage area.  The area was
used from approximately 1963 to 1970.  Soil sampling showed no detectable solvents or
elevated amounts of metals, therefore, it was determined that-no hazardous source is present.

                                          14

-------
NRF-38 is a precast manhole that received steam condensate from the site steam system. The
condensate would evaporate or infiltrate into the soil. The manhole was likely used from 1958
to the 1980s. No hazardous source is present.

NRF-42 is the location of a former temporary sewage pond used in the 1950s.  There is no
evidence that a hazardous source exists at the site, but elevated amounts of metal, semi-volatile
organic, and low-level radionuclide contaminants may be present based on sampling performed
in the current sewage lagoons.  Based on groundwater sample results and using average
concentration data from the current sewage lagoons, this site does not represent a significant
groundwater threat.  The site is currently covered with a  10 foot layer of soil, tht*s- limiting
ingestion or direct contact with any contaminants, if present.  Based on current conditions (i.e.,
10 foot soil cover), the risk was estimated to be low based on the Track 1 evaluation.

NRF-52A, 52B, and 47 represent three locations of a lead casting and storage building.
NRF-52A and 52B consist of two former locations where the  soil was disturbed during past
construction activities after the building was relocated. Soil samples collected near the original
building location (NRF-52A) showed elevated levels of lead; however, the levels were still below
the EPA recommended screening level for lead cleanup  of 400 ppm. The risk for the original
building location was estimated to be low based on the Track 1 evaluation.  The building was
moved in 1956. There was no evidence of elevated lead levels at this second location
(NRF-52B).  No hazardous source is present at this second building location. The building was
again moved in 1982 to its current location (NRF-47). Although the building is no longer used
for lead casting, samples collected from the current building location showed the building siding
and drainage system did not have elevated lead levels; thus, no hazardous source was
determined to be present.

NRF-54 is a steam boiler blowdown pit that was used for several years in the 1950s. The pit
has reinforced concrete walls and a dirt floor. The condition of the pit is not known since the pit
and access to the pit are presently covered by grass. The pit received water from  blowdown of
the boilers to prevent scale buildup in the system.  No hazardous source is present.

NRF-55 consists of 17 french drains located around NRF. Eleven of the drains are used for
steam condensate, five for storm water, and one receives water from occasional washing of
vehicles. The french drains are gravel filled excavations to promote infiltration. These drains
would not have received hazardous constituents, and therefore were determined to not contain
a hazardous source.

NRF-61 is a former location of a radioactive material storage and laydown area that was used
from 1954 to 1960.  Soil sampling showed  detectable amounts of cesium-137.  The risk
assessment assumed an institutional control period for the future residential scenario. The risk
was estimated to be low based on the Track 1 evaluation.

NRF-64 is a gravel pit that has been used as a construction rubble pile. The rubble pile consists
of concrete, metal, wood, and asphalt. A piece of asbestos was found at the site in 1989.  A
burn pile exists near the gravel pit and the  ground appears stained with petroleum
hydrocarbons. It is hypothesized that petroleum products were used to facilitate burning
combustible waste.  Soil sampling showed elevated total petroleum hydrocarbons. The risk was
estimated to be low based on the Track 1 evaluation.

NRF-68 is an area that has been used for vehicle parking and construction pipe staging and
cutting operations. This site was erroneously titled a "corrosion" area. Soil sampling showed
detectable total petroleum hydrocarbons in the area. Small amounts of chlorobenzene were
also detected in the soil. The risk was estimated to be low based on the Track  1 evaluation.


                                          15

-------
3.1.3   Operable Unit 8-03

OU 8-03 consists of eight miscellaneous sites that were initially designated as Track 1 high
priority sites. Each site was evaluated in a Track 1 investigation.

NRF-10 is an area where sandblast grit from paint removal operations in the 1950s was
deposited. The sandblast grit was removed in 1990. Verification sampling performed in  1991
showed elevated levels of several metals in the soil.  Arsenic, chromium, and lead were
detected at concentrations above background levels. A Track 1 risk assessment was performed
that calculated  risk-based soil concentrations for the residential and occupational-scenarios.
Although chromium and arsenic were detected in individual samples above risk-based soil
concentrations, the risk assessment used very conservative estimates and a risk management
decision was made that actual risks are acceptable.

NRF-15 and 20 are acid spill areas. Elevated levels of metals are present at each site. NRF-20
included lead contaminated soil  above the EPA recommended screening level for lead cleanup.
A soil removal action was performed at NRF-20 after receiving public comment on the proposed
action. The only contaminants remaining at elevated levels after the removal action are
mercury and lead (which is now below the screening level goal of 400 ppm). Sampling at
NRF-15 showed elevated levels of chromium, lead,  mercury, and nickel. The concentrations of
contaminants at both sites were determined to be below risk-based concentrations. A risk
assessment for each site estimated risks to be low based on the Track 1 evaluations.

NRF-18A and NRF-18B are the  S1W Spray Ponds,  A1W Cooling Tower, and portions of the fire
protection system, and were originally designated as one site, NRF-18. At one time, a
chromium based corrosion inhibitor was used in the water. The spray ponds are large concrete
structures that contained cooling water for S1W plant operations.  The A1W Cooling Tower
served a similar function for the A1W prototype plant. Leakage and overspray from the ponds,
tower, and fire protection system caused elevated chromium concentration in the surrounding
soil.  The Track 1 risk assessment assumed the spray ponds would remain in place, limiting
exposure to the soil below the basins if any contamination was present. The resulting risk
assessment estimated a low risk based on the Track 1  evaluation,  but additional evaluation of
NRF-18 in the NRF Comprehensive RI/FS concerning the groundwater pathway was
considered appropriate.

The A1W Cooling Tower was demolished in 1995. In 1997, a decision was made to demolish
the S1W Spray Pond #2.  Subsequent to the Comprehensive RI/FS, NRF-18 was split into two
sites:  NRF-18A, S1W Spray Pond #1, and portions of the fire protection system; and NRF-18B,
S1W Spray Pond #2 and A1W Cooling Tower. Additional data was collected at Spray Pond #2
after the NRF Comprehensive RI/FS in preparation of demolishing the spray pond.  Twenty-four
boreholes drilled through the bottom of the spray pond  and twenty  boreholes outside the
perimeter of the spray pond were used to collect additional samples.  Sample results  showed
slightly elevated amounts of chromium. The risk associated with Spray Pond #2 was
determined to be low with much less uncertainty than the initial assessment because of the
additional data. Spray Pond #1  was not included in this evaluation since no additional data
were collected  from Spray Pond #1 and, therefore, Spray Pond #1  was given a separate site
designation (NRF-18A).

NRF-22 is the location of a former french drain that  may have received paints, solvents, and
possibly mercury.  A removal action was performed after receiving public comment on the
proposed action.  Sampling performed after the removal action showed elevated levels of lead
and mercury remained. The excavated hole was 12 feet deep and was grouted to the surface
eliminating all exposure pathways.  The risk assessment after the removal action estimated the


                                         16

-------
risk to be low based on the Track 1 evaluation.  Although no exposure route is present, a source
remains at the site.

NRF-45 is the former location of an incinerator used to burn outdated documents. The
incinerator was used at this location from 1985 to 1992. Barium, silver, and zinc were detected
at elevated levels during sampling of the ash from the incinerator. The concentrations were
determined to be below risk-based concentrations for the occupational and residential
scenarios.  The risk for the site was estimated to be low based on the Track 1 evaluation.

NRF-56 is a former location of a pipe degreasing and pickling facility used between 1957 and
1961. The facility was replaced with a railroad car shed which was used as a pipe fitter and
welder training shop and is currently a records storage building.  The original facility was likely
completely removed when the railroad car shed was placed at this location. No hazardous
source is present.

3.1.4 Operable Unit 8-04

OU 8-04 consists of sixteen sites where spills, primarily petroleum products, have occurred.
Each site was evaluated in a Track 1 investigation.

NRF-28. 29, 31, 58, 65, 69, 70,  71, 72, 74, 75, 76, and 77 represent sites of past petroleum
product  releases. Most of the sites were oil  release areas with the exception of NRF-69 (diesel)
and NRF-71 (gasoline). These  spill areas were generally cleaned up, but some residual
contamination exists. The contaminants of concern include polychlorinated biphenyls (PCBs),
total petroleum hydrocarbons, benzene, toluene, ethylbenzene, and xylene. Each contaminant
was determined to be below risk-based concentrations. A risk assessment for each site
estimated the risk to be low based on the Track 1 evaluations.

NRF-44 is an area where wastewater was discharged between 1954 and 1959. The  discharges
included surface water runoff, steam condensate, cooling water, and water from an oil-water
separator. No hazardous source is present.

NRF-62 is the location of a past nitric acid spill.  Around 1960, 2,460 gallons of acid was spilled.
The area has since been disturbed and covered by ECF expansion construction activity.  No
remaining hazardous source is present.

NRF-73 is a former varnish tank. The  varnish tank was used from 1970 to  1980 and was
removed in 1991. Xylene was the primary component of the varnish. There was no evidence of
tank leakage when  the tank was removed in 1991. No hazardous source is present.

3.1.5 Operable Unit 8-09

OU 8-09 consists of the interior  industrial waste ditch system. The interior waste ditch system is
comprised of a network of culverts, pipes, and uncovered drainage ditches with a combined
length of 23,000 feet. The system collected  discharges from prototype operations, support
operational activities, and storm water. Various modifications to the ditch system have been
made throughout the years. The ditch may have received small amounts of hazardous
constituents from cooling systems, photographic operations, and laboratory operations between
1953 and 1985. No hazardous  constituents have been discharged since 1985. Contaminants
of concern included various metals, organics, and radionuclides (cesium-137 and cobalt-60).  A
Track 2 assessment was performed on this unit. The calculated risks were within the target risk
range and are considered  by the agencies to be acceptable.
                                          17

-------
3.2    Site Characteristics (Operable Unit 8-08 Sites)

OU 8-08 sites were investigated as part of the NRF Comprehensive RI/FS.  OU 8-08 included
several radiological areas and was the last OU investigated.  The 18 sites associated with OU
8-08 are discussed in more detail below. The investigation of the radiological sites in OU 8-08
was one of the primary purposes of the NRF Comprehensive RI/FS.

3.2.1   Background

Low-level radioactive effluent, primarily water with small amounts of radioactivityr-was generated
by each prototype facility as a result of past operations.  Between June 1953 and April 1979,
this low-level radioactive effluent was discharged to several leaching beds in accordance with
established regulations at the time. These leaching beds are also referred to as leaching pits,
ponds, lagoons, basins, or drainfields. These discharges were discontinued in 1979 when a
water reuse system was established.

Beginning in 1953, low-level radioactive effluent from the S1W prototype was sent to a drainfield
known as the S1W Tile Drainfield (NRF-11). This drainfield was also likely used for sewage
discharges.  In 1955. the sewage system and radioactive system were separated.  NRF-11  was
no longer used and radioactive effluent went to an underground perforated pipe drainfield
(NRF-12A).  Around 1957, a pit was dug at the end of the drainfield to allow the water to pond
The pit is known as the S1W Leaching Pit (NRF-12B).

A special basin or pit was constructed in 1956 for a one-time discharge of radioactive effluent
that contained some oil.  This basin was referred to as the S1W Temporary  Leaching Pit
(NRF-13). The pit was used to prevent the drainfields from receiving oily effluent thereby
reducing their efficiency. The temporary pit was filled in with the soil immediately after the
one-time discharge.

A1W began operation  in 1958, with ECF beginning shortly thereafter. The A1W Leaching Bed
(NRF-19) was constructed on the west side of NRF.  The bed received effluent from A1W and
ECF.  The leaching bed was used sporadically through 1972.

In 1960, a new leaching bed known as the S1W Leaching Bed (NRF-14) was constructed south
of the S1W prototype to receive S1W prototype effluents. This bed was a ponding area to allow
infiltration of liquid into the soil. A second pond was constructed adjacent to the first in 1963.
These ponds primarily received effluent from S1 W, but also received effluent from the other
facilities (S5G, A1W, and ECF).  The last discharge to the leaching beds was in 1979.

Most of the effluent associated with the S1W discharge areas (NRF-11, NRF-12B, and NRF-14)
was stored in the S1W Retention Basins (NRF-17) prior to final discharge to the  areas.  The
basins were constructed of concrete and were used from 1953 to 1972.

Approximately 417,000,000 gallons, containing 345.41 curies, were discharged to the various
drainfields, pits, and beds at NRF between 1953 and 1979. Table 2 summarizes the curies and
gallons released to each site.  Table 3 gives a summary by year of the curies and gallons
released to all the sites.

In addition to the controlled releases of low-level radioactive liquid, there have been
occurrences of inadvertent releases to the environment because of leaks from underground
piping (NRF-80) and concrete basins (NRF-17 and 79), surface releases (NRF-16, 66, and 81),
and cross-contamination of non-radiological systems with radiological systems (NRF-02, 21 A,
21B, 23, and 43).  In most cases, these releases are small compared to the controlled
discharges.
                                          18

-------
One site was used for a one-time sludge disposal area (NRF-32). This site represents the only
site where potentially radioactive material (sludge) other than water may have been deposited.

  Table 2. Total Controlled Discharges (gallons and curies) to Radiological Areas (1953-1979)
  Unit                               Volume (gallons)            Quantity (curies)'"
NRF-1 1
NRF-12
NRF-13
NRF-14
NRF-19
Totals
(a) Based
17,500,000
64,102,650
28,000
249,809.113
85.500,310
416,940,073
on discharge records from 1960 to 1979 to the S1W Leaching Beds (NRF-14),
5.33
67J951
0.003
131.35
140.866
345.41
those radionuclides individually
       representing greater than 5% of the curie content include cobalt-60 (33%), tritium (28%), and cesium-137 (7.6%).
       Discharges to NRF-11 and NRF-12 would be similar to NRF-14. The discharge to NRF-13 was primarily strontium-90.
       Based on discharge records to the A1W Leaching Bed (NRF-19), those radionuclides individually representing greater
       than 5% of the curie content include tritium (54%), cobalt-60 (15%), and cesium-137 (5.8%).

The vast majority of the discharges to the radiological areas were water with small amounts of
radioactivity. Metal and organic constituents were likely present in very small quantities. The
metal and organic constituents would have been from processes associated with the prototype
plants and ECF. These processes included radiochemical  laboratory operations, component
decontamination procedures, bilge drainage, oil-water separation, and decontamination
showers and sinks.

Radionuclides of concern are primarily the longer-lived radionuclides from testing and operation
of prototype nuclear reactors or from spent fuel examinations.  Most of the radionuclides with a
radioactive half-life less than five years would have naturally decayed to almost undetectable
levels by today for any releases between 1953 and 1979.  The primary radionuclides with half-
lives greater than five years released at NRF are cesium-137, cobalt-60, strontium-90, and
tritium.  Tritium, which was part of the water molecules in the effluent, would have migrated or
evaporated with the water. Tritium would not be expected in the soil near the discharge areas
today, since water associated with the effluent is no longer present.  Cesium-137 and
strontium-90, with half-lives near 30 years, and cobalt-60, with a half-life slightly greater than
5 years, would be the primary radionuclides of concern present in the soil today.

3.2.2   OU 8-08 Site Assessments

Eighteen sites were identified as radiological areas requiring an individual assessment in the
NRF Comprehensive RI/FS. The assessment included reviewing past historical information and
past sample results.  An initial list of contaminants of potential concern (COPCs) was
established based on the discharges to the site and past sample data.  This data included early
monitoring data and characterization sample data collected between  1990 and  1992.  The
preliminary list of COPCs was compared to risk-based screening levels. These screening levels
are concentrations resulting in an estimated increased cancer risk of  1 in 10,000,000 (1E-07) or
a hazard quotient of 0.1.  The development of risk-based screening levels is discussed in
Section 4.1.2.1.  Cancer risks and hazard quotients are discussed in more detail in Section 4.0.
A conservative approach was used to establish the initial list of COPCs. Maximum contaminant
levels from each site were used for screening purposes. Early monitoring data helped identify
COPCs and the potential extent of contamination at some locations.  The characterization data
                                           19

-------
Table 3.  Yearly Controlled Radiological Discharges to Radiological Areas
                      (NRF-11. 12. 13. 14, 19)
Year
1953
1954
1955
1956
1957
1958
1959
1960
1961
1962
1963
1964
1965 .
1966
1967
1968
1969
1970
1971
1972
1973
1974
1975
1976
1977
1978
1979
Totals
Volume (gallons)
2,500,000
10,000,000
10,000,000
10,928,000
11,970.000
15,260,000
18,745,000
24,373,000
24,552,650
28,118,770
27,291,200
27,328,598
33,115,417
36,904,836
35,372,638
37,987,954
28,529,781
20,399,951
10,680,479
1,232,098
525,174
440,111
276,852
162.571
194,298
44,830
5,865
416,940,073
Quantity (curies)
0.08
2.25
6.0
3.467—
5.482
31.29
8.68
31.104
23.729
40.893
58.911
32.4
23.65
18.49
8.854
13.453
15.875
12.263
3.720
0.696
0.5165
1.588
1.002
0.423
0.303
0.260
0.028
345.408
                                20

-------
from 1990-92 typically had the data quality currently required by the EPA for use in risk
assessments.

The historical evaluation of the sites provided the basis for the remedial investigation sampling
plans.  The sampling served several different purposes depending on the area in which the
sampling was being performed. In some cases, the determination of a contaminant source and
the extent of contamination were the goals of the sampling. This allowed a risk assessment
evaluation to be performed with a higher degree of certainty. For other areas, it was important
to determine the potential volume of soil that may require a remedial action. In these areas, the
nature  of the contaminants was Known from previous sampling, but a more definitive boundary
was needed to provide accurate estimates of potential soil volumes requiring remedial actions.
Enough past information was available for some areas that additional  sampling during the
remedial investigation was not required. After evaluating the historical and remedial
investigation sample results, a final list of COPCs was established. These COPCs were used
for risk assessments performed as part of the NRF Comprehensive RI/FS and are discussed in
Section 4.0.

The following sections describe the characteristics associated with each of the OU 8-08 sites.

3.2.2.1       Old Ditch Surge Pond (NRF-02)

The surge pond area (NRF-02) was excavated in late 1958 or early 1959 as a gravel or soil pit
for construction projects at NRF. The pit was approximately 110 feet in diameter and 12 feet
deep. The pit was later connected to a drainage ditch and was likely used as a storm water
drainage area for heavy precipitation events.  Around 1963, the pit and drainage ditch were
connected to the NRF interior waste ditch system. The pit, which then acted as a pooling place
for water, was used as either an overflow or settling area. The pond area and a portion of the
ditch were isolated from the waste ditch system in 1985 when portions of the ditch system were
replaced with underground, corrugated piping.

This area was not included in the remedial investigation sampling. Surface soil samples have
been collected in the area  from 1986 to 1993. The samples were analyzed for cobalt-60 and
cesium-137. Cobalt-60 was detected at a maximum activity of 11.28 picocuries per gram
(pCi/g) in 1991 and cesium-137 was detected at a maximum activity of 4.7 pCi/g in 1992.
Characterization sampling was performed at the pond in 1991.  Samples  were collected from a
borehole in the middle of the ditch to a depth of three feet where the basalt was encountered.
Samples were analyzed for pesticides, PCBs, organics and metals. The only COPCs detected
were arsenic at 8.5 parts per million (ppm) and chromium at 90.2 ppm, which were both above
background levels.

The extent of the contamination is limited to the pond area and attached ditch.  The
contamination is limited to the upper two feet of soil.

3.2.2.2       S1W Tile Drainfield and L-shaped Sump (NRF-11)

NRF-11 consists of a below-surface sump and various underground, perforated drainfield pipes
downstream of the sump.  The drainfield was likely used between 1953 and 1955 for sewage
and radioactive liquid discharges.  The drainfield is approximately 36 feet wide by 200 feet long
and consists of four lateral perforated pipes buried six to ten feet deep. The drainfield was
connected to the sump, which is a L-shaped concrete structure.  Each leg of the sump is 11 feet
long and three feet wide with a depth of 12-1/2 feet. The sump was isolated from the drainfield
in 1955 and was used until 1960 as part of the sewage system.
                                         21

-------
An estimated 17,500,000 gallons of radioactive effluent containing 5.33 curies of radioactivity
were discharged to the drainfield via the sump. Although discharge records during the
timeframe NRF-11 was used did not specify radionuclides, discharges to the drainfield would be
similar to later discharges to other facilities. Discharge records from 1960 to 1979 show
cobalt-60 (33%), tritium (28%), and cesium-137 (7.6%) were the primary radionuclides released.
By 1996, the radioactivity would have decayed to an estimated 0.33 curies. Cobalt-60, with a
half-life of only five years, would have decayed to very small levels after 40 years.  Tritium
would have leached or evaporated with the water. Small amounts of chemicals and oil in the
effluent may have been released to the drainfield.

The source of contamination around the L-shaped sump was the same as the drainfield. The
sump may have leaked to surrounding soils. In addition, the sump was used until 1960 as part
of the sewage system.

Characterization sampling efforts in 1991 collected samples to a depth of 22 feet from a
borehole in the drainfield area. The samples were analyzed for pesticides, PCBs, organics, and
metals. The only COPCs detected were arsenic (maximum of 7.6 ppm, which is slightly above
background), dieldrin (a pesticide at 0.008 ppm in a single sample), cobalt-60 (maximum of
0.07 pCi/g), and cesium-137 (maximum of 0.3 pCi/g, which is actually below surficial soil
background levels).

During the remedial investigation, attempts were made to locate the drainfield piping using
geophysical methods, but these attempts were inconclusive. Samples were collected from 11
boreholes at the drainfield and around the sump. Due to uncertainties in the location of the
drainfield piping, the samples may not have been located adjacent to the piping where
contamination is suspected. Samples were collected to a depth of 12 feet and analyzed for
radionuclides, organics, PCBs, pesticides, and metals. The only COPC detected in the
drainfield area was cobalt-60 at 2.7 pCi/g in one borehole from an eight foot depth.  Several
COPCs were detected around the sump. Arsenic (maximum of 8.92 ppm at an eight foot depth)
was the only non-radiological COPC detected.  Americium-241 (0.42 pCi/g in  a single sample at
a 12 foot depth), americium-243 (0.5 pCi/g in a single sample at a 12 foot depth), cesium-137
(maximum of 45.98 pCi/g at an eight foot depth), cobalt-60 (maximum of 1.17 pCi/g at a 12 foot
depth), manganese-54 (0.06 pCi/g in a single sample at a eight foot depth), and plutonium-244
(0.09 pCi/g in a single sample at a 12 foot depth) were the radiological COPCs detected.

The remedial investigation sampling indicates that any significant contamination at the drainfield
is likely confined to a small  volume of soil near the underground pipes. The extent of
contamination is estimated  to be an area one foot around the perimeter of the underground
piping, which is six to ten feet deep.  The contamination around the sump is expected to be
within three feet of the sump walls. Past sampling from within the L-shaped sump confirm the
presence of cesium-137 above risk-based levels at this site. Based on historical and process
knowledge, uncertainty regarding the actual location of the drainfield piping, and sample results
from the L-shaped sump located upstream of the drainfield, the agencies have made the
presumption that soils at the drainfield are contaminated with cesium-137 above risk-based
levels.

3.2.2.3       Underground Piping to Leaching Pit (NRF-12A)

In 1955, a drainfield was constructed south of S1W,  adjacent to NRF-11 (SIWTile Drainfield).
The drainfield was an underground, perforated pipe that ran from a manhole to a location 400
feet south of the manhole.  The pipe depth was eight feet. This drainfield was used for
radiological discharges after NRF-11 was no longer used. In 1957, a pit was dug at the end of
the underground pipe to allow pooling of the water. The pit is known as the S1W Leaching Pit
(NRF-12B).  The drainfield  was used for discharges  until 1960. NRF-12A includes the manhole

                                          22

-------
and the underground piping from the S1W Retention Basins (NRF-17) to the manhole and from
the manhole to the leaching pit.

An estimated 64,100,000 gallons of radioactive effluent containing 67.9 curies of radioactivity
were discharged to the drainfield via the manhole. Cobalt-60 and cesium-137 were likely the
primary radionuclides released. Most of the cobalt-60 will have decayed away leaving
cesium-137 as the primary radionuclide of concern.

Samples were collected from 18 boreholes to a depth of 10 feet during pre-RI/FS sampling in
October 1995 along the underground pipe from the retention basins to the manfcole.  Samples
were analyzed for radionuclides and metals. The COPCs detected were chromium (maximum
of 110 ppm at an eight foot depth), cesium-137 (maximum of 7,204 pCi/g at an eight foot depth),
cobalt-60 (maximum of 70.8 pCi/g at a six foot depth), nickel-63 (maximum of 75.15 pCi/g at an
eight foot depth), strontium-90 (maximum of 28.28 pCi/g at an eight foot depth),  and
plutonium-239 (a single sample of 0.0728 pCi/g at an eight foot depth).

The remedial investigation sampling included five boreholes along the underground pipe from
the retention basins to the manhole, three boreholes around the manhole,  and five boreholes
along the underground,  perforated pipe leading from the manhole. Samples were analyzed for
PCBs, metals, and radionuclides. The following COPCs were detected: chromium (maximum
of 97 ppm at a ten foot depth), mercury (maximum of 6.5 ppm at an eight foot depth),
americium-241  (maximum of 0.60 pCi/g at a six foot depth), carbon-14 (maximum of 8.7 pCi/g at
an eight foot depth), cesium-137 (maximum of 7,323 pCi/g at an eight foot depth), cobalt-60
(maximum of 104.9 pCi/g at an eight foot depth),  nickel-63 (maximum of 329.06  pCi/g at an
eight foot depth), plutonium-238 (maximum of 0.60 pCi/g at an eight foot depth), plutonium-239
(maximum of 0.20 pCi/g at an eight foot depth), plutonium-244 (maximum of 0.24 pCi/g at an
eight foot depth), and strontium-90 (maximum of  35.35 pCi/g at an eight foot depth).

Most of the contamination at NRF-12A is within three to five feet of the underground pipe.
Contamination exists along the entire 400 foot length of underground, perforated pipe from the
manhole to the leaching pit location. Contamination  is also present along approximately
one-half the 500 foot length of underground pipe  from the retention basins to the manhole. The
contaminants are primarily present between the six and ten foot depth.

3.2.2.4       S1W Leaching Pit (NRF-12B)

In 1957, a pit was dug at the end of the underground, perforated pipe drainfield (NRF-12A).
This pit was known as the S1W Leaching Pit (NRF-12B). The pit was used from 1957 until
1961 when it was filled in with soil.  The pit was approximately eight feet wide, eight to ten feet
deep, and 50 feet long.  The releases to the pit were discussed in the previous section.
Cesium-137  and cobalt-60 were the primary contaminants released.  An asphalt cover was
placed over the  leaching pit location in 1978 and  is present at the site today.

Historical sampling has shown elevated levels of radionuclides in the area of the leaching pit.
Although the historical sampling did not meet modem data quality requirements for use in risk
assessments, it  did provide valuable information  on the location of the pit and types of
contaminants present.  Characterization samples were collected in 1991 from a borehole near
the leaching  pit. Samples were collected to a depth of 18 feet and were analyzed for metals,
radionuclides, organics, pesticides and PCBs. The COPCs detected were arsenic (maximum of
100 ppm at a three foot depth), lead (maximum of 1,140 ppm at a three foot depth), cesium-137
(maximum of 1.09 pCi/g at a three foot depth) and cobalt-60 (maximum of 0.11 pCi/g at a
15 foot depth).   Because of the low level of radionuclides detected, the borehole was probably
outside the boundary of the leaching pit.


                                          23

-------
The leaching pit was evaluated in the NRF Comprehensive RI/FS with the S1W Leaching Beds
(NRF-14) because the pit is adjacent to NRF-14.  The sampling plan identified the leaching
beds and leaching pit as one sampling area, since they had similar discharges, were located
next to each other, and had the same sampling goals. The purpose of the RI/FS sampling was
to provide enough data to estimate the volume and level of contamination of the soil outside the
known discharge areas.

Samples were collected from ten boreholes outside the leaching beds and leaching pit down to
a depth of 20 feet. Samples were also collected from a borehole that was estimated to be over
the leaching pit. From the boreholes at or near the leaching pit the following COPCs were
detected:  cesium-137 (maximum of 1,600 pCi/g at a 14 foot depth), cobalt-60 (maximum of
9.2 pCi/g at a 14 foot depth), plutonium-239 (maximum of 0.13 pCi/g at a 14 foot depth), and
strontium-90 (maximum of 37.3 pCi/g at a 14 foot depth).  Carbon-14 may also be present
because it was detected in samples collected upstream of the leaching pit (NRF-12A).

The contamination at NRF-12B is primarily at the location of the former pit, which was estimated
to be eight feet wide and 50 feet long.  The radionuclide contamination was  generally found at
the 14 foot depth.  Some metals were detected at a three foot depth during characterization
sampling in 1991, but this is suspected to be from soil placed over the area  after it was no
longer used.

3.2.2.5       S1W Temporary Leaching Pit (NRF-13)

A temporary pit (NRF-13) was dug in 1956 for the one-time discharge of 28,000 gallons of oily
contaminated radioactive liquid.  The pit was used to prevent other radioactive discharge areas
from receiving oily effluent and reducing their efficiency. The pit was 15 feet in diameter and
18 feet deep. The 28,000 gallons of effluent contained 0.003 curie of radioactivity. The only
identified radionuclide was a maximum of 0.00024 curie of strontium-90.  Other suspected
radionuclides include cobalt-60 and cesium-137.  The pit was  used for the one-time discharge
and then was filled in with the excavated soil.

Characterization sampling was performed in the area in 1991.  Samples were collected from the
suspected location of the pit to a depth of 25 feet.  Samples were analyzed for radionuclides,
metals, organics, pesticides, and PCBs. The only COPCs detected at the site were arsenic
(maximum of 9.3 ppm at a 13 foot depth), cesium-137 (maximum of 0.15 pCi/g at a 20 foot
depth) and cobalt-60 (maximum of 0.1 pCi/g at a 15 foot depth). The cesium-137 and cobalt-60
data were near minimum detectable levels.  No additional sampling was performed in this area.

The extent of contamination at NRF-13 is the 15 foot diameter of the pit with a conservatively
estimated depth starting at 13 feet and ending at 23 feet below the surface.

3.2.2.6       S1W Leaching Beds (NRF-14)

The first S1W Leaching Bed was constructed in 1960. The bed was an open pond that allowed
the water to evaporate or infiltrate into the ground. A second bed was constructed in 1963
adjacent to the first bed. Each bed was about 75 feet by 125 feet at the water line and was 13
to 15 feet deep. The beds originally received radioactive effluent from the S1W prototype plant
and later received effluent from the S5G and A1W prototypes  and  ECF. The beds were used
from 1960 to 1979 and received approximately 250,000,000 gallons of water containing 131
curies of radioactivity.  The primary radionuclides released were cesium-137, cobalt-60, and
tritium. Tritium, which exhibits similar properties as water, would not be expected in the soil
today. The cobalt-60 would have decayed to much smaller levels. Small amounts of chemicals
and oil may have been released to the leaching beds.

                                         24

-------
This site includes the underground pipe leading to the leaching beds. The pipe was known to
have leaked on one occasion; however, much of the contaminated soil was excavated at that
time.

Characterization sampling of the beds was performed in 1992. Samples were collected from a
borehole in each bed down to the basalt layer below the beds. The basalt layer is
approximately 35 feet below the surface. The samples were analyzed for radionuclides, metals,
organics, PCBs, and pesticides. The following nonradiological COPCs were detected during the
sampling (All depths noted are from the bottom of the beds): aroclor-1260 (a PCB at 0.245 ppm
in a single sample at a three foot depth), arsenic (maximum of 18.3 ppm at a 29-foot depth),
chromium  (maximum of 65.1 ppm  at a three foot depth), and mercury (maximum of 3.9 ppm at a
three foot depth).  The following radiological COPCs were detected during the sampling:
americium-241 (maximum of 5.9 pCi/g at a three foot depth), cesium-137 (maximum of
2,040 pCi/g at a three foot depth),  cobalt-60 (maximum of 407 pCi/g at a three foot depth),
nickel-63 (maximum of 730 pCi/g at a four foot depth), plutonium-238 (maximum of 5.9 pCi/g at
a three foot depth), plutonium-239 (maximum of 0.5 pCi/g at a three foot depth), and
strontium-90 (maximum of 83 pCi/g at a four foot depth).  The americium-241 and
plutonium-238 were not distinguished from each other, and therefore, the 5.9 pCi/g represents
the potential maximum for either radionuclide.

The S1W Leaching Beds were evaluated with the S1W Leaching Pit (NRF-12B) during the NRF
Comprehensive RI/FS as explained in the previous section. Since the 1992 sampling
sufficiently characterized the soil below the leaching  beds, the purpose of the RI/FS sampling
was to define the lateral extent of contamination outside the leaching beds, which would allow
the estimation of soil volume contaminated above risk-based levels.  Samples were collected
from 10 boreholes to a depth of 20 feet adjacent to the beds and pit. Samples collected from
boreholes adjacent to the beds showed very little migration of contaminants in the upper 20 feet
of soil. Cobalt-60 was the only COPC detected and was detected at a maximum concentration
of 1.21 pCi/g at a 14 foot depth.

Three additional boreholes were drilled to the basalt  on the north, west, and south side of the
leaching beds where a historic perched water layer existed above the basalt. Small amounts of
contaminants were found in these  boreholes.  The COPCs detected in these boreholes were
arsenic (maximum of 8.61 ppm at a 30 foot depth), lead (maximum of 29.5 ppm at a 30 foot
depth), cobalt-60 (maximum of 1.02 pCi/g at a 25 foot depth), neptunium-237 (0.79 pCi/g in a
single sample at a 30 foot depth), nickel-63 (9.67 pCi/g in a single sample at a 25 foot depth),
and strontium-90 (3.37 pCi/g in a single sample at a 25 foot depth).

The extent of contamination at NRF-14 is primarily within the soil directly below the leaching
beds.  The borehole sampling adjacent to the leaching beds showed only small amounts of
contaminants.  The contaminants are primarily retained within the top four feet of the bottom of
the leaching beds. Contamination significantly drops off after the four foot depth.

The sampling performed at the historic perched water area showed no residual water and only
minimal contamination with no exposure pathway available because of the significant depth of
the residual contamination. Neptunium-237, which was not detected in the leaching beds, was
detected at a very small concentration (0.79 pCi/g) in a single sample from the former perched
water zone. It was the only contaminant detected at  a higher concentration in the former
perched water area than in leaching bed samples.

3.2.2.7       Radiography Building Collection Tanks (NRF-16)

The radiography building was constructed in 1954, north of the S1W prototype plant.  The
building was originally constructed to decontaminate radioactive equipment. Various solvents
                                         25

-------
were likely used in the decontamination process. Two underground tanks were used to collect
the solvents after the decontamination process. In 1960, the building was converted to perform
radiography to find defects in various materials. The decontamination tanks were no longer
used. The tanks and associated piping were removed in 1993. The tanks were in good
condition with no apparent leaks from the tanks.

Historical sampling has been done around the tank and building area. Past spills of radioactive
liquid occurred in this area and were generally cleaned up at the time of the spill.  The historical
sampling helped determine the likely location of past spills and establish an initial list of COPCs.
Characterization sampling was performed in 1990. Soil samples were collected-from a borehole
to a depth of 22 feet adjacent to the underground tanks. The only COPC detected above risk-
based concentration was arsenic, which was detected at a maximum concentration of 9.6 ppm
at the 22 foot depth.

Soil samples were collected from 20 targeted locations during the NRF Comprehensive RI/FS to
evaluate potential past spills in the area.  Samples were collected from the surface, one foot
depth, and two foot depth. The following COPCs were detected above background and risk-
based concentrations near the radiography building:  arsenic (maximum of 7.64 ppm at a ten
foot depth), cesium-137 (maximum of 10.8 pCi/g at the surface), cobalt-60 (maximum of
0.36 pCi/g at the surface), and uranium-235 (0.18 pCi/g in a single sample at a one foot depth).
Uranium-235 is a naturally occurring radionuclide, but background levels at the INEEL are not
known.  Samples were also collected from a borehole adjacent to a sump located next to the
building and from the sediment present in the sump.  The sump, which is the lowest point near
the building, is the most likely location to detect past spills.  Samples were collected to a depth
of ten feet, which was below the sump depth.  Additional COPCs were detected in the sump
sediment.  They were benz(a)anthracene (0.26 ppm), benzo(a)pyrene (0.26 ppm),
benzo(b)fluoranthene (0.430 ppm) and indeno(1,2,3-CD)pyrene (0.18 ppm).

The extent of contamination at NRF-16 is expected to be limited to the upper few feet of soil as
a result of past surface spills. Very little contamination has been found in the subsurface soil.

3.2.2.8       S1W Retention Basins (NRF-17)

The S1W Retention Basins (NRF-17) were constructed in 1951. The basins are two concrete
structures 140 feet long by 34 feet wide. The basins received radioactive effluent from the S1W
prototype plant and later received effluent from the S5G and A1W prototype plants and ECF.
The basins were used as a radioactive liquid storage facility prior to discharging the liquid to the
discharge areas (S1W Tile Drainfield, S1W Leaching Pit, and the S1W Leaching Beds).  One of
the basins is known to have leaked approximately 33,000 gallons in 1971. The leak was directly
below the basins.

Because of the difficulty in collecting samples below the basins, sampling was deferred until the
basins  are demolished under decontamination  and dispositioning activities associated with the
remedial action at NRF. Samples were collected during the NRF Comprehensive RI/FS
adjacent to the basins where past surface soil contamination was suspected. Samples were
collected from four locations to a depth of one foot.  Arsenic (maximum of 17 ppm) and lead
(maximum of 89 ppm) were the only constituents detected above background levels.

The extent and level of contamination below the S1W Retention Basins is unknown.  However,
soil sampling performed at downstream sites from the basins within the same disposal system
showed an unacceptable risk for cesium-137 and strontium-90 to a potential 100-year future
resident. It is also known that one of the basins leaked on at least one occasion and the
leakage was capable of contaminating soils below the basins.  Therefore, a presumptive


                                          26

-------
decision was made that some of the soils beneath the retention basins are contaminated with
cesium-137 and strontium-90 at concentrations which exceed risk-based levels.

3.2.2.9       A1W Leaching  Bed (NRF-19)

The A1W Leaching Bed (NRF-19) was constructed west of NRF in 1957.  The bed was not an
open pond like the S1W Leaching Beds. The A1W Leaching Bed was similar to a drainfield with
underground, perforated pipes  distributing the liquid to an area constructed of gravel and sand.
The bed was 200 feet long and 50 feet wide.  The bed was used continually from 1958 to 1964
for effluent discharges from the A1W prototype and ECF. The bed was used sporadically from
1964 until 1972, when use of the bed was  discontinued.

A total of 85,500,000 gallons of water containing 141 curies of radioactivity was discharged to
the leaching bed. The primary  contaminants released were cesium-137, cobalt-60,
strontium-90, and tritium. Cobalt-60 would have decayed to much smaller levels.  Tritium, which
exhibits similar properties as water, would  not be expected in the leaching bed today.  The
leaching bed may have received small  quantities of chemicals and oil associated with various
processes at A1W and ECF.

Characterization sampling was performed  at NRF-19 in 1991-92. Samples were collected from
a borehole in the center of the leaching bed. The borehole depth was ten feet where the basalt
layer was encountered.  Arsenic (maximum of 8.0 ppm at a nine foot depth) and chromium
(maximum of 298 ppm at a five foot depth) were the only nonradiological COPCs detected. The
radiological COPCs detected were americium-241 (maximum of 20 pCi/g  at a five foot depth),
cesium-137 (maximum of 1,390 pCi/g at a five foot depth), cobalt-60 (maximum of  129 pCi/g at
a six foot depth), nickel-63 (maximum of 730 pCi/g at a five foot depth), plutonium-238
(maximum of 20 pCi/g at a five  foot  depth), plutonium-239 (maximum of 1.18 pCi/g at a five foot
depth), strontium-90 (maximum of 750  pCi/g at a five foot depth), and uranium-234 (maximum
of 4.7 pCi/g at a five foot depth). The estimated depth of the underground, perforated pipe is
five feet. The americium-241 and plutonium-238 results were not distinguished from each other
and therefore, the 20 pCi/g represents the potential maximum for either radionuclide.

Sampling was performed during the NRF Comprehensive RI/FS around the perimeter of the
A1W Leaching Bed.  Four boreholes were drilled adjacent to the bed.  The only COPCs
detected above background and risk-based screening levels were carbon-14 (maximum of
6.73 pCi/g from a ten foot depth), cobalt-60 (maximum of 2.12 pCi/g from a 14 foot depth), and
strontium-90 (maximum of 24.86 pCi/g  from a 14 foot depth).

The RI/FS sampling also included three boreholes drilled northwest, north, and northeast of the
leaching bed down to the basalt. These boreholes were in an area of a historic perched water
layer.  The only COPCs detected above background and risk-based concentrations in these
samples were carbon-14 (3.35  pCi/g in a single sample at  a ten foot depth) and coba!t-60
(maximum of 0.43 pCi/g at an 18 foot depth).  Background levels for carbon-14 are unknown

The extent of contamination at  the A1W Leaching Bed is limited to the soil within and directly
below the leaching bed. Very little migration of the contaminants was found. This represents an
area 200 feet by 50 feet with a  depth of 10 feet.

3.2.2.10      Old Sewage Basin (NRF-21 A)

In 1956. a sewage basin (NRF-21 A) was constructed to the southeast of NRF. The sewage
basin was an open pond that was originally 72 feet by 72 feet and 11 feet deep. The basin was
cross-contaminated with the radiological discharge system in 1956. The basin was enlarged in


                                         27

-------
1957 to approximately double the original length and was used until 1960.  The basin has since
been filled in with soil.

Soil samples were collected from a borehole in the estimated location of the basin during
characterization sampling in 1991 to a depth of 20 feet. Samples were analyzed for
radionuclides, metals, organics, pesticides, and PCBs. Arsenic (maximum of 8.5 ppm at a three
foot depth) and n-nitrosodi-n-propylamine (0.92 ppm in a single sample at a 20 foot depth) were
the only nonradiological COPCs detected above background and risk-based concentrations.
Cesium-137 (maximum of 0.18 pCi/g at a one foot depth) and cobalt-60 (maximum of 0.13 pCi/g
at a 20 foot depth) were the radiological COPCs detected.                  —

Soil samples were collected during the NRF Comprehensive RI/FS from two boreholes at the
basin.  One borehole was near the expected discharge point, while the second borehole was
near the center of the basin.  Samples were collected to a depth of 14 feet and were analyzed
for radionuclides, metals, and organics. No COPCs were detected in the second borehole.  In
the first borehole, the nonradiological COPCs detected above background and risk-based
concentrations were antimony (maximum of 180 ppm at a 14 foot depth), cadmium (maximum
of 13 ppm at a 14 foot depth), chromium (maximum of 1,000 ppm at a 14 foot depth), mercury
(maximum of 10 ppm at a 14 foot depth), and silver (maximum of 55 ppm at a  14 foot depth).
The radiological COPCs detected above  risk-based concentrations were cesium-137 (maximum
of 229 pCi/g at a 14 foot depth) and cobalt-60 (maximum of 2.6 pCi/g at a 14 foot depth). The
14 foot depth corresponds to the original  depth of the basin and includes a three foot layer of
soil that was mounded over the basin when it was filled.

Soil samples were also collected from 40 random sample locations over the basin and an
adjacent area (NRF-43) that was used for a one-time pumpout of the basin. The soil over the
basin was sampled because, when the basin was filled in, a three foot layer of soil was placed
over the basin that likely came from the pumpout area. Samples were collected from the
surface, one foot depth, and two foot depth. Samples were analyzed for cesium-137 and
cobalt-60 and no detectable amounts were found at the one and two foot depths over the basin
Cesium-137 was detected at a maximum of 1.9 pCi/g at the surface.

The extent of contamination at NRF-21A is estimated to be  a two foot layer of soil at the bottom
of the original basin prior to the basin being elongated in 1957.  The second borehole sampled
during the RI/FS was in the location of the expanded basin and no COPCs were detected.

3.2.2.11      Sludge Drying Bed (NRF-21B)

The sludge drying bed (NRF-21 B) was constructed in 1951  as part of the sewage system at
NRF. The bed was a concrete slab that was 25 feet by 25 feet and slab was approximately five
feet below surrounding ground elevation. The bed received sludge from the sewage system
The bed was suspected to have been contaminated with radionuclides when the sewage
system was cross-contaminated with the radiological discharge system in 1956.  The bed has
since been filled in with soil to surrounding surface elevation.

The only sampling performed at NRF-21 B was during the NRF Comprehensive RI/FS. Samples
were collected from four boreholes at the bed down to the concrete slab. Samples were
analyzed for radionuclides, metals, organics, and PCBs.  The following nonradiological COPCs
were detected above background and risk-based concentrations: antimony (maximum of
55 ppm),  cadmium (maximum of 4 ppm), chromium (maximum of 420 ppm), mercury (maximum
of 13.9 ppm), silver (maximum of 52 ppm), benzo(a)pyrene (0.1 ppm in a single sample), and
benzo(b)fluoranthene (maximum of 0.19 ppm). The following radiological COPCs were
detected:  cesium-137 (maximum of 43.6 pCi/g), cobalt-60 (maximum of 1.06 pCi/g), and


                                        28

-------
uranium-235 (0.17 pCi/g in a single sample). All the sample results above were from the four
foot depth.

The extent of contamination at NRF-21B is limited to the 25 foot by 25 foot concrete slab. The
depth of contamination is between four to six feet.

3.2.2.12      Sewage Lagoons (NRF-23)

The NRF Sewage Lagoons (NRF-23) are located northeast of NRF.  The lagoons were
constructed in 1960 and were expanded in 1972. The lagoons are open ponds-measuring 425
feet by 725 feet at water level. The lagoon bottoms are clay lined. The southwest lagoon has
only been used for occasional overflow from the northeast lagoon since 1984. The northeast
lagoon is still in use.

Past sampling has shown organics, metals, and radionuclides present in the sediment of the
lagoons.  Sufficient sample results were available to calculate a 95% upper confidence limit
(UCL) for most metal and radionuclide constituents. The following COPCs were detected during
past sampling:  arsenic (25.6 ppm, 95% UCL), cadmium (5.1  ppm, 95% UCL), chromium
(571 ppm, 95% UCL), mercury (2.5 ppm, 95% UCL), silver (180 ppm, maximum concentration),
benz(a)anthracene (0.22 ppm, maximum concentration), cesium-137 (3.6 pCi/g, 95% UCL), and
cobalt-60 (0.39 pCi/g, 95% UCL). The cesium-137 and cobalt-60 data were from environmental
monitoring sampling performed in 1994 and 1995, which is the most current reliable data
available and represents randomly collected samples over the lagoon.  The metal and organic
data is from samples collected in 1988. The silver is shown as a maximum concentration since
the 95% UCL for silver was much higher because of the wide range of silver concentrations
detected during the sampling. All sample results are from the southwest lagoon although similar
concentrations would be expected in the northeast lagoon.

Perched water is known to exist approximately 20 feet below the northeast sewage lagoon. The
extent of this perched water zone is limited to within 50 feet of the edge of the lagoon. Other
minor perched water zones were discovered at various depths, 300 to 500 feet from the  lagoon
This information suggests that a  stair-step migration pattern exist at the sewage lagoon.
Perched water sampling has  shown slightly elevated levels of nitrates and several  anions (e.g.,
chloride) and cations (e.g., sodium) associated with the sewage lagoons. Groundwater
monitoring data indicates that the sewage lagoon is the primary source of nitrate to the aquifer
near NRF. Other contaminants contained within the sewage lagoon sediment appear to remain
bound in those sediments.

The vertical extent of contamination present at the sewage lagoons is estimated to be 12
inches, which represents the average sediment layer thickness on the bottom of the lagoons.
The horizontal extent of contamination is the area of the sediment on the bottom of the lagoons.
This represents an area approximately 360 feet by  680 feet for each lagoon.

3.2.2.13      S5G Basin Sludge Disposal Bed (NRF-32)

In 1967, sludge from a cleaning effort at the S5G prototype was disposed of to an area south of
S5G.  The S5G hull basin at one time held water to allow simulation of sea conditions. The
contaminants present in the sludge were not known and may have contained small quantities of
radionuclides. The volume of sludge disposed of to the area was conservatively estimated at a
maximum of 3,000 cubic feet.

Sampling was performed during the NRF Comprehensive RI/FS at this  site. Samples were
collected from three boreholes where the sludge was buried.  Samples were analyzed for


                                         29

-------
radionuclides, organics, metals, and PCBs.  The only COPC detected was arsenic at a
maximum concentration of 8.49 ppm from a 10 foot depth.

3.2.2.14      Seepage Basin Pumpout Area (NRF-43)

A sewage basin (NRF-21A) was pumped out to the surrounding area (NRF-43) in August 1958.
The basin had been cross-contaminated with the radioactive discharge system in 1956, and
therefore, the basin contents likely contained some radioactivity.  The volume or amount of
radioactivity released from the basin is not known.  Historic sampling has shown some
detectable levels of radioactivity in the pumpout area. This sampling helped determine the
location of the pumpout area and identify potential COPCs.

Characterization sampling was performed in the area in 1991.  Soil samples were collected to a
depth of five feet and analyzed for metals, organics, radionuclides, pesticides, and PCBs.  The
COPCs detected above background and risk-based concentrations were arsenic (maximum of
7.8 ppm at a five foot depth) and cesium-137 (maximum of 1.08 pCi/g at a three foot depth).

Soil samples were also collected from 40 random sample locations over the basin and the
pumpout  area during the NRF Comprehensive RI/FS. Samples were collected from the surface,
one foot depth, and two foot depth. Sufficient samples were collected and analyzed for
cesium-137 that a 95% upper confidence limit for cesium-137 was calculated to be 1.31 pCi/g.
Other COPCs detected above risk-based screening levels were carbon-14 (36.71 pCi/g in a
single sample) and plutonium-239 (0.94 pCi/g in a single sample). This sampling showed that,
where radioactivity was detected, most of the activity was in the upper two feet and only small
activity levels were detected at the two foot depth.

The extent of contamination at NRF-43 is limited to the upper two feet of soil, which is a result of
the one time  pumpout of the sewage basin (NRF-21 A).  NRF-43 represents an area of
approximately 97,000  square feet.

3.2.2.15      Hot Storage Pit (NRF-66)

NRF-66 was misidentified as a hot storage pit. The area was a waste tanker loading area
where radioactive liquid waste was collected for processing at other INEEL facilities. Various
inadvertent releases may have occurred in the tanker loading area. The releases would have
been cleaned up to established standards at the time of the release.  Contaminated soil was
removed  from the area in 1980.

Sampling was performed at NRF-66 during the NRF Comprehensive RI/FS. Soil samples were
collected  from 14 shallow boreholes to a two foot depth.  The purpose of the sampling was to
evaluate potential residual contamination in the soil from past surface spills  in the area. The
samples were analyzed for radionuclides. The only COPC detected above background and a
risk-based concentration was cesium-137 at a  maximum activity of 1.88 pCi/g.

The extent of contamination at NRF-66 is limited to a two foot depth. The area is approximately
10 foot by 45 foot.

3.2.2.16      ECF Water Pit Release (NRF-79)

A maximum one-time release of 62,500 gallons of water from ECF occurred in late 1991 and
early 1992. The ECF water contained small amounts of carbon-14, cesium-137, cobalt-60,
manganese-54, nickel-63, strontium-90, and tritium. A very conservative assumption was made
for the risk assessment calculations discussed in Section 6.0 that the entire volume of water
immediately migrated  to the aquifer without any dilution and was  available for consumption. No

                                         30

-------
soil sampling was performed because contaminants, if present, would be 30 feet below the
surface and unavailable for exposure to any receptors.

3.2.2.17      A1W/S1W Radioactive Line near BB19 (NRF-80)

During the construction of A1 W, a pipe was installed from the A1W prototype to the S1W
Retention Basins that allowed radioactive effluents from A1W to be sent to the S1W radioactive
discharge system. The pipe was buried approximately six feet below the surface. The pipe is
known to have leaked on one occasion (NRF-80). During decontamination and dispositioning
work at NRF in 1995, portions of the pipe were removed and contamination was-detected in the
soil. Cobalt-60 was detected up to 1,600 pCi/g and cesium-137 was detected up to 7 pCi/g.

Sampling was performed during the NRF Comprehensive RI/FS in an area likely to have been
contaminated from a past pipe leak. Samples were  collected from six boreholes to a depth of
ten feet. The only COPC detected above risk-based concentrations was cobalt-60, which was
detected at a maximum level of 14.56 pCi/g at an eight foot depth.

Some uncertainty exists with this site. The extent of contamination at NRF-80 is unknown.  Past
contamination is known to be present in the soil,  but the contamination probably is sporadic
making characterization sampling of the site very difficult.  Process knowledge of the waste
stream and sampling performed at discharge areas associated with this site suggest that the
sampling performed in 1995 is not representative of all the contamination present at this site.
Cesium-137 and strontium-90 have been detected above  risk-based levels at other discharge
areas associated with NRF-80.  Therefore, a presumption is made that cesium-137 and
stontium-90 are present in soils immediately beneath the depth of the remaining pipe at
concentrations that exceed acceptable risk-based levels for a future 100-year resident.

3.2.2.18      A1W Processing Building Area Soil (NRF-81)

The A1W processing building area (NRF-81) is located west of the A1W prototype plant. The
area contains several tanks and associated piping systems that were used to process
radioactive  effluent from the A1W plant.  Several historical inadvertent releases have occurred
in the area from past operations. Two known releases occurred in 1980 and 1982. Soil
samples were collected from the area after the releases were cleaned up. In 1994.
underground radioactive piping was removed from the processing building area during
decontamination and dispositioning work at NRF. Soil samples were collected frequently during
the excavation work and analyzed for radioactivity.  No elevated radioactivity levels were found

Sampling was not performed during the NRF Comprehensive RI/FS in this area because
evidence suggests that past spills in the area were cleaned up and the area is very similar to
other areas where surface spills occurred. Cesium-137 was detected at a maximum of
2.1 pCi/g and cobalt-60 was detected at a maximum of 1.4 pCi/g during past sampling.  A
conservative assumption was made that the maximum concentrations of other radionuclides
detected at similar sites were present at this site. This includes 36.71 pCi/g of carbon-14,
0.94 pCi/g of plutonium-239, and 0.18 pCi/g of uranium-235.

The maximum extent of contamination at NRF-81 would be the upper three feet of soil and an
area approximately 100 feet by 130 feet. The area represents a fenced in location around the
processing  building and the estimated size is considered conservative.

3.3    Site Characteristics (New Sites)

NRF-82 (Evaporator Bottom Tank Release) was an area identified after the NRF
Comprehensive RI/FS was completed. This site  consists of the soil surrounding an

                                         31

-------
underground storage tank vault. The tank and its contents will be managed under other
regulatory actions.  One spill was known to have occurred at the area in 1972. The spill was
cleaned up to the standards at that time and additional construction has occurred in the area.
Slightly elevated amounts of radioactivity were reported after the cleanup was performed in
1972.  Additional cleanup was performed in 1977.  This site was evaluated in  a Track 1
investigation and the risk was estimated to be low based on the  Track 1 evaluation. This site
hzd no impact on the cumulative risk assessment.

NRF-83 (ECF Hot Cells Release Area) was also an area identified after the NRF
Comprehensive RI/FS was completed. The site is the location of a radioactive liquid release
that occurred in 1972. Radioactive liquid was released from a pipe to a concrete trench.  The
soil below and adjacent to the trench became contaminated. Cleanup actions taken in 1972 did
not include the soil below the trench. The contaminated soil was discovered in 1997 when a
concrete pad adjacent to the concrete trench was removed during ECF Hot Cell upgrade work.
Cobalt-60 and cesium-137 were present in the soil. An estimated 28 cubic meters of soil is
contaminated with cobalt-60 and cesium-137 below the trench.  This soil remains in place to
preserve the structural integrity of the trench.  All accessible contaminated soils  adjacent  to the
south side of the trench were removed during the construction project and replaced with clean
soil.  A new concrete pad was poured at the location of the old concrete pad excavation as part
of the Hot Cell upgrade work. The contaminated soil beneath the trench is not presently
accessible and no exposure route is available. The site was evaluated in a Track 1
investigation and the risk was estimated to be low based on the  Track 1 evaluation. This site
had no impact on the cumulative risk assessment.

3.4    Groundwater Characteristics

The remedial investigation included a hydrogeologic study. This study consisted of a review of
past hydrogeologic data from multiple studies, review and  interpretation of seven years of
groundwater data collected near NRF, groundwater flow modeling of the Snake  River Plain
Aquifer (SRPA), modeling of contaminant fate and transport, and developing groundwater
contour, flow direction and contaminant migration maps. Information from the study was  used in
the risk assessments (summarized in Section 4) for evaluating the groundwater  ingestion
pathway.  Several specific conclusions of the hydrogeologic study are highlighted below.

Groundwater modeling at NRF confirmed that NRF is located over a portion of the SRPA that
possesses a lower gradient than the surrounding aquifer.  The lower gradient  (i.e., flatter  water
table) and accompanying slower water flow through the aquifer,  both consequences of a  less
permeable aquifer, allow surface recharge from NRF operations to increase the  elevation of the
water table under NRF.  The result is a lobed-shaped high in the water table on the east side of
NRF. The high extends from the north side of NRF to the  south  side of NRF.

In 1994, a well fitness evaluation was performed at NRF to determine the quality of the wells
used in the NRF groundwater monitoring network.  At nearly the same time, NRF performed
groundwater modeling, as outlined above, to assess aquifer flow paths near NRF and the
optimal placement of groundwater monitoring wells. As a result  of the fitness  evaluation and
modeling work, six new groundwater monitoring wells were constructed and were included in
the NRF groundwater monitoring network. As of January 1996,  the wells used in the
groundwater monitoring network included five United States Geological Survey (USGS) wells
and eight NRF wells. Of these wells, two are used to assess the general upgradient quality of
the SRPA, two are used to assess the affects on groundwater of effluent discharged to the
industrial waste ditch, and six are located in a semi-circular arc just south of NRF, and are used
to sample the local SRPA water downgradient of NRF. The remaining three wells are located
south of NRF and are used to sample the regional characteristics of the SRPA downgradient of
NRF.

                                          32

-------
Samples have been collected from the NRF groundwater monitoring network since 1989. The
recently constructed groundwater monitoring wells were specifically designed to monitor the
upper 50 feet of the SRPA.  Results obtained from analyses of samples collected from the
USGS wells are primarily used for screening purposes, and verify that the new monitoring wells
are sufficiently spaced so as to detect contaminants emanating from past or current activities at
NRF.

Based on samples collected from nine downgradient wells, chromium, nitrates, tritium, and
various salts were detected at slightly elevated levels. The average concentrations of these
constituents occurring in groundwater monitoring wells downgradient of the source are as
follows: chromium at 0.05 ppm, nitrates at 2.3 ppm, tritium at 308 picocuries per liter (pCi/l),
and chloride (salt) at 226 ppm. Based on samples collected from 1989 to 1998,  the chromium,
nitrate, tritium, and salt concentrations show no apparent increasing trend.

Fate and transport modeling was performed using the GWSCREEN computer program.  All
contaminants detected at OU 8-08 sites above risk-based concentrations in the soil were
included in modeling runs to assess their potential migration to the aquifer.  No contaminants
were predicted to reach the aquifer within 100 years under normal precipitation conditions.
Additional fate and transport analyses of past and current aquifer recharge points (e.g.,
industrial waste ditch) were performed and concluded that the industrial waste ditch, active NRF
sewage lagoon, and potential deep perched water associated with past discharges to the S1W
Leaching Beds are the only NRF sites with appreciable quantities of contaminants currently
migrating. Contaminants include trivalent chromium (industrial waste ditch), tritium (S1W
Leaching Beds), nitrates (active sewage lagoon), and various salts (industrial waste ditch and
active sewage lagoon).

Perched water was found to be present at several locations beneath  NRF. Perched water is
almost universally associated with substantial recharge due to infiltration associated with
surface discharge.  A perched water zone is currently found beneath the industrial waste ditch
and another is located under the NRF sewage lagoon.  The contaminants present in the
perched water zones are reflective of their source.  The industrial waste ditch perched water
zone contains elevated levels of salts and chromium.  Perched water beneath the sewage
lagoon contains slightly elevated levels of nitrates, cations (e.g., sodium), and anions (e.g.,
chloride). Two former shallow perched water zones (approximately 20 to 30 feet) were known
to exist (early 1960s) beneath the S1W and A1W Leaching Beds, but sampling performed
during the remedial investigation show these perched water zones are no longer present.

Deep perched water (in excess of 100 feet) may currently exist beneath the S1W Leaching
Beds.  The elevated levels of tritium currently detected in samples from the groundwater
monitoring wells nearest to the S1W Leaching Beds are probably due to residual deep perched
water which  contains small amounts of tritium. Tritium migrates in the environment as water;
therefore, the majority of tritium released to the leaching beds has long since evaporated or
migrated and dispersed into the SRPA. The remaining tritium associated with this deep
perched water is gradually dispersing into the SRPA. This dispersion is slow because the
recharge source (i.e., discharge to the leaching beds) is no longer present.  Dispersion
processes further lower tritium levels to below background in  groundwater downgradient of
NRF. Tritium levels found and monitored  in wells located near the S1W Leaching Beds since
1996 are expected to decrease over time from decay, dilution, and depletion of the source.

The hydrogeologic study concluded that NRF has had a limited impact on the SRPA, primarily
due to  slightly elevated levels of chromium, nitrates, tritium, and  various salts. Additionally,
these constituents have not shown an increasing trend and are not expected to increase in the
future.

                                          33

-------
4.0    Summary of Site Risks

Several different risk assessments were performed to evaluate the potential human health and
environmental risks posed by the identified sites at NRF.  Track 1 and Track 2 investigations
were performed for OUs 8-01, 02. 03, 04, and 09 prior to the NRF Comprehensive RI/FS.  The
following risk assessments were performed as part of the NRF Comprehensive RI/FS:  risk
assessments for OU 8-08 sites not previously investigated, a cumulative risk assessment of all
NRF sites, and an ecological risk assessment. The OU 8*08 site assessments evaluated the
human health risk associated with contaminants present at each site. The cumulative risk
assessment evaluated the potential cumulative, or additive, human health risks for receptors
based on their proximity to multiple sites and potential for exposure from more than one site at a
time.  The ecological risk assessment evaluated the potential risk to ecological receptors.

The following se.ctions describe the three different types of risk assessments performed at NRF.
In addition, two new sites were identified after the NRF Comprehensive RI/FS and Track 1 risk
assessments were performed on these sites.

4.1     Individual Site Risk Assessments

4.1.1   OUs 8-01, 02, 03, 04, and 09 Site Risk Assessments

A Track 1 or Track 2 investigation was performed for each site associated with OUs 8-01, 02,
03, 04, and 09 prior to the NRF Comprehensive RI/FS. The Track 1  investigations, including
the determination of the level of risk (semi-quantitative), were performed using INEEL guidance
manuals for conducting Track 1 and Track 2 investigations. These guidance manuals were
developed under the direction of DOE, State of Idaho, and EPA Region 10 personnel and
provide general guidance on toxicity assessment, exposure assessment, risk characterization,
default exposure parameter, etc.  Typical default exposure parameters used during the Track  1
or Track 2 risk assessments would be the same as those shown in Section 4.1.2.2.2, which
discusses the exposure parameters used to assess OU 8-08 sites in the NRF Comprehensive
RI/FS.  The completed Track 1 or Track 2 investigation documents, which provide details of the
risk assessments, are part of the Administrative Record (Appendix A provides a current list of
documents available in the Administrative Record).

The risk assessments typically resulted in a low estimated risk or no  hazardous source being
present. The low estimated risk was due to the small amounts of contaminants present at the
site or because an exposure to contaminants under current site conditions was not likely.
Table 4 summarizes the risk assessments performed for the sites associated with OUs 8-01, 02.
03, 04, and 09.  The table indicates if a source is present and the result of the risk assessment
(identified as no risk, low risk, or acceptable risk).  The table also shows if the resulting risk was
due to no source being present, a small contaminant source being present, or current site
conditions limiting exposure to contaminants at the site.

For those sites with no risk because no source is present or with a low or acceptable risk
because the contaminant source is small, no remedial actions would be expected. For those
sites with a low or acceptable risk because of current site conditions  (contaminants inaccessible
because of structures, soil covers, or administrative controls), maintaining those site conditions
would be expected.
                                          34

-------
Table 4. Risk Assessment Summary Table for OUs 8-01, 02, 03, 04. and 09
Operable
Unit
OU 8-01







OU 8-02












OU 8-03








OU 8-04
















OU 8-09

Site
Number

NRF-03
NRF-06
NRF-08
NRF-33
NRF-40
NRF-41
NRF-63

NRF-09
NRF-37
NRF-38
NRF-42
NRF-47
NRF-52A
NRF-52B
NRF-54
NRF-55
NRF-61
NRF-64
NRF-68

NRF-10
NRF-15
NRF-18A
NRF-18B
NRF-20
NRF-22
NRF-45
NRF-56

NRF-28
NRF-29
NRF-31
NRF-44
NRF-58
NRF-62
NRF-65
NRF-69
NRF-70
NRF-71
NRF-72
NRF-73
NRF-74
NRF-75
NRF-76
NRF-77

None
Source
Present

Yes
No
No
No
No
No
No

Yes
No
No
Yes
No
Yes
No
No
No
Yes
Yes
Yes

Yes
Yes
Yes
Yes
Yes
Yes
Yes
No

Yes
Yes
Yes
No
Yes
No
Yes
Yes
Yes
Yes
Yes
No
Yes
Yes
Yes
Yes

Yes
Estimated
Risk

Low
None
None
None
None
None
None

Low
None
None
Low
None
Low
None
None
None
Low
Low
Low

Acceptable
Low
Low
Low
Low
Low
Low
None

Low
Low
Low
None
Low
None
Low
Low
Low
Low
Low
None
Low
Low
Low
Low

Acceptable
Basis for Risk Determination


Small Contaminant Source
No Source
No Source
No Source
No Source
No Source — -
No Source

Small Contaminant Source
No Source
No Source
Site Conditions
No Source
Small Contaminant Source
No Source
No Source
No Source
Site Conditions
Small Contaminant Source
Small Contaminant Source

Small Contaminant Source
Small Contaminant Source
Site Conditions
Small Contaminant Source
Small Contaminant Source
Site Conditions
Small Contaminant Source
No Source

Small Contaminant Source
Small Contaminant Source
Small Contaminant Source
No Source
Small Contaminant Source
No Source
Small Contaminant Source
Small Contaminant Source
Small Contaminant Source
Small Contaminant Source
Small Contaminant Source
No Source
Small Contaminant Source
Small Contaminant Source
Small Contaminant Source
Small Contaminant Source

Small Contaminant Source
35

-------
4.1.2  OU 8-08 Site Risk Assessments

A human health risk assessment was performed for each of the 18 radiological areas that were
not assessed in a previous investigation before the NRF Comprehensive RI/FS except for
NRF-17 (S1W Retention Basins). The assessment included identifying COPCs for each site, an
exposure assessment, a toxicity assessment, and a risk characterization.  A risk assessment
was not performed for NRF-17 because sampling was not done below the basins in the
suspected area of potential contamination.

4.1.2.1       Identification of Contaminants of Potential Concern        	

Past sampling, process knowledge, discharge records, and sampling during the NRF
Comprehensive RI/FS were used to develop a list of COPCs.  Since soil is the media of
concern, a soil concentration term was established for each COPC at each site.  The
concentration term was typically the maximum concentration detected during characterization
sampling performed in 1991-92, recent sampling from the Environmental Monitoring Program,
or RI/FS sampling.  These sampling evolutions provided data with the proper data quality for
use in risk assessment calculations.  In a few cases where sufficient sample results existed, the
concentration term was the 95% upper confidence limit of the mean, which provides a more
balanced depiction of the contaminant concentrations present at a site. Historical sampling prior
to 1990 was not generally used because the data collected did not meet CERCLA quality
assurance requirements needed for risk assessment calculations. Data prior to 1990 was used
if it was the only data available and sufficient quality control of the samples could be
determined.  The historical data did, however, provide valuable information on site locations and
COPCs.

The concentration terms were compared to risk-based soil screening levels and background
levels.  Risk-based levels were based on concentrations in the soil corresponding to an
increased cancer risk of 1 in 10,000,000 (1E-07) or a hazard quotient of 0.1.  The terms
increased cancer risk and hazard quotient are discussed later in this section. The risk-based
screening levels for non-radiological constituents were obtained from the EPA Region III Risk-
Based Concentration Table.  The table contains reference doses and carcinogenic potency
slopes (discussed in Section 4.1.2.3) which were taken from the Integrated Risk  Information
System (IRIS), Health Effects Assessment Summary Tables (HEAST), and other EPA sources.
These toxicity constants are combined with "standard" exposure scenarios to calculate risk-
based concentrations. The risk-based level for lead is the EPA recommended screening level
for lead cleanup (400  ppm). For radiological constituents, standard INEEL default exposure
parameters were used and concentrations were calculated using standard INEEL Track 2 risk
assessment equations given in the INEEL Track 2 guidance document. Background soil
concentrations are INEEL published values. Those COPCs with a concentration term greater
than background and  risk-based levels were retained for evaluation in the risk assessment.
Those contaminants with a concentration term less than background or risk-based levels were
removed as COPCs.

4.1.2.2       Exposure Assessment

The exposure assessment estimates the magnitude of actual and/or potential receptor
exposures, the frequency and duration of these exposures, and the pathways by which
receptors are potentially exposed to various COPCs.

4.1.2.2.1     Exposure Scenarios

The human health risk assessment for each site evaluated residential and occupational
scenarios.  For the residential scenario,  assessments were made for a receptor residing at the

                                         36

-------
site 30 years and 100 years in the future. The future residential scenario assumes the site
remains under Federal government control for at least 30 or 100 years. An assumption is also
made that the contaminants present at the site are available to the residential receptor for
exposure regardless of the depth. This takes into consideration the construction of a residence
with a basement and the availability of the excavated soil for exposure.

A current and 30-year occupational scenario is also evaluated. Again, it is assumed that the
contaminants are available for exposure regardless of the depth.  The occupational scenario
assumes that no controls are in place to prevent exposure to COPCs.

Soil ingestion, inhalation of fugitive dust, and external radiation exposure are the potential
exposure pathways considered for the occupational and residential scenarios.  In addition, the
groundwater ingestion and food crop ingestion pathways are considered only for the residential
scenario.  For the occupational scenario, the food crop ingestion pathway is not a concern and,
since the drinking water is continuously monitored, the groundwater ingestion pathway is not a
concern. The dermal absorption pathway was qualitatively evaluated for the residential
scenario.

4.1.2.2.2     Quantification of Exposure

Adult exposures were evaluated for all scenarios and pathways. Child exposures were
considered separately only for the soil ingestion pathway in  the residential scenario, because
children are likely to ingest more soil than are adults.

The exposure parameters used in the risk assessment were obtained from EPA and DOE
guidance.  The exposure parameter default values used in the risk assessment are designed to
estimate the reasonable maximum exposure at a site. Using this approach may tend to over-
estimate the risk. Exposure duration and frequency are  used to determine the total time of
exposure. Exposure duration would be the number of years residing or working at a site, and
exposure frequency is the number of hours per day and  days per year that a receptor may be
exposed to the site during the exposure duration period. The exposure parameters used in the
risk assessment were:

Body Weight:
       Adult: 70 kilograms -» 154 pounds
       Child: 15 kilograms -» 33 pounds

Exposure Duration:
       Occupational: 25 years
       Residential:   30 years
             Adult:  24 years
             Child:  6 years

Exposure Frequency:
       Occupational: 8 hours per day, 250 days per year
       Residential:   24 hours per day,  350 days per year

Ingestion/lnhalation Rate:
       Soil Ingestion:
          Occupational: 50 milligrams per day -* size of % aspirin tablet
          Residential:
             Adult:     100 milligrams per day -* size of 1/2 aspirin tablet
             Child:     200 milligrams per day -» size of 1 aspirin tablet

                                          37

-------
       Inhalation:
          Occupational:  20 cubic meters per work day -* equivalent to the volume of air in an
                                                     8 by 11 foot room by 8 foot high.
          Residential:   20 cubic meters per day
       Water Ingestion:
          Residential:   2 liters per day

4.1.2.3       Toxicity Assessment

A toxicity assessment was conducted to identify potential adverse effects to humans from
contaminants at NRF. A toxicity value is the numerical expression of the substance
dose-response relationship used in the risk assessment. Toxicity values (slope factors and
reference doses) for the sites were obtained from the EPA's IRIS database and EPA's HEAST
The reference dose is the toxicity value used to evaluate noncarcinogenic effects that result
from exposure to chemicals, and is based on the concept that there is a threshold that must be
reached before adverse effects occur. The slope factor is the toxicity value used to evaluate
potential human carcinogenic effects. The slope factors have been derived based on the
concept that for any exposure to a carcinogenic chemical, there is some risk of a carcinogenic
response. The slope factor is used in a risk assessment for the purpose of estimating an upper
bound lifetime probability of an individual developing cancer from the exposure to a specific
level of a carcinogen.

4.1.2.4       Risk Characterization

Carcinogenic effects are calculated as the incremental probability of an individual developing
cancer over a lifetime as a result of exposure to the potential carcinogen. Generally, CERCLA
cleanup decisions are based on carcinogenic excess risk levels slightly greater than 1 chance in
10,000 (1E-04) where excess risk is the possibility of contracting cancer above the national
average.  The target risk range for CERCLA sites is between 1E-04 and 1E-06 and represents
an upper and lower risk level where a remedial action may be required if the agencies
determine an action is justified. A remedial action is likely at risk levels greater than 1 E-04  A
risk less than 1E-06 is usually considered acceptable.  A risk management decision on whether
a remedial action is appropriate is made by the agencies when the calculated risk is between
1 E-04 and 1E-06.

The potential for a noncarcinogenic effect is evaluated by comparing an exposure level over a
specified time period  (e.g., lifetime) with a toxicity reference dose derived for a similar exposure
period. The reference dose is a toxicity value representing the acceptable upper limit of a
substance as determined  by the Agencies based on various scientific studies. The ratio of
exposure to the reference dose is called a hazard quotient. A hazard quotient less than one is
considered acceptable, while a hazard quotient greater than one indicates a risk management
decision is needed to determine if a remedial action is justified.  The sum of all hazard quotients
associated with a particular area is a hazard index. The calculation of the hazard index involves
the use of uncertainty factors to ensure a large safety margin is present.

Table 5 summarizes the human health risk assessments performed for each site showing the
contaminant, exposure pathway, and calculated risk or hazard quotient if the increased cancer
risk was greater than or equal to 1 E-06 or the hazard quotient was greater than or equal  to 1.
Some contaminants have both carcinogenic risks and noncarcinogenic effects, and therefore
may have an increased carcinogenic risk and a hazard quotient (noncarcinogenic). Those
constituents identified as COPCs during the site characterization for each site (Section 3 2.2),
but which did not show a risk greater than 1E-06 or a hazard quotient greater than 1.0, are
shown on Table 6 and were eliminated as COPCs.


                                          38

-------
Table 5. OU 8-08 Individual Site Risk Assessment Summary
Unit/Constituent Current Occupational 30-year 30-year Residential 100-year Residential
Occupational
Risk HQ Risk HQ Risk
NRF-02 - Old Ditch Surgj Pond
(No Further Action site)
Arsenic 2e-06 - 2e-06 - 3e-05
Cesium- 137 5e-05 NA 3e-05 NA 1e-04
Cobalt-60 4e-04 NA 7e-06 NA 4e-05
NRF-13 - SIWTemporan' Leaching Pit
(No Action site)
No risks greater than 1e-06 or HQ greater than 10
NRF-23 - Sewage Lagoons
(No Further Action site)
Arsenic 7e-06 -- 7e-06 •- 8e-05
Mercury10 NA « NA -- NA
Cesium-137 4e-05 NA 2e-05 NA 1e-04
Cobalt-60 2e-05 NA -- NA 2e-06
NRF-79 - ECF Water Pit Release
(No Action site)
Cesium-137 NA NA NA NA 1e-05
Cobalt-60 NA NA NA NA 7e-06
Tritium NA NA NA NA 5e-05
Nickel-63 NA NA NA NA 3e-06
Strontium-90 NA NA NA NA 3e-06
HQ Risk HQ

3e-05
NA 3e-05 NA
NA - NA




8e-05
6.6 NA 6.6
NA 2e-05 NA
NA -- NA


NA 3e-06 NA
NA - NA
NA -- NA
NA 2e-06 NA
NA - NA
Pathway'"


Ingestion of Soil1"1
Ingestion of Food Crops""
External Exposure""
Ingestion of Food Crops""
External Exposure




Ingestion of Soil""
Ingestion of Food Crops""
Ingestion of Food Crops""
External Exposure""
Ingestion of Food Crops""
External Exposure


Ingestion of Groundwater""
Ingestion of Groundwater
Ingestion of Grot|ndwater
Ingestion of Groundwater""
Ingestion of Groundwater
                        39

-------
Unit/Constituent Current Occupational 30-year 30-year Residential 100-year Residential Pathway'"
Occupational
Risk HQ Risk HQ Risk
NRF-81 - A1W Processing Building Area Soil
(No Further Action site)
Cesium- 137 3e-05 NA 1e-05 NA 7e-05
Cobalt-60 8e-05 NA 2e-06 NA 8e-06
Uranium-235 - NA -- NA 1e-06
NRF-14 - S1W Leaching Beds""
NRF-12B - S1W Leachlno Pit
(Remedial Action sites)
Arsenic 3e-05 - 3e-05 -- 3e-04
Mercury NA -- NA - NA
Americium-241 -- NA - NA 5e-06
Cesium- 137 2e-02 NA 1e-02 NA 7e-02
Cobalt-60 2e-02 NA 4e-04 NA 2e-03
Neptunium-237 - NA - NA 1e-05
Nickel-63 - NA - NA 7e-06
Plutonium-238 -- NA - NA 3e-06
Strontium-90 1e-06 NA -- NA 1e-03
HQ Risk HQ


NA 1e-05 NA External Exposure""
Ingestion of Food Crops""
NA -- NA External Exposure
NA 1e-06 NA External Exposure""


1.6 3e-04 1.6 Ingestion of Soil""
Ingestion of Food Crops""
10 NA 10 Ingestion of Food Crops""
NA 5e-06 NA Ingestion of Soil""
Ingestion of Food Crops""
NA 1e-02 NA Ingestion of Soil""
Ingestion of Food Crops""
External Exposure""
NA -- NA Ingestion of Soil
Ingestion of Food Crops
External Exposure
NA 1e-05 NA Ingestion of Food Crops'0'
NA 5e-06 NA Ingestion of Food Crops""
NA 2e-06 NA Ingestion of Soil""
NA 9e-04 NA Ingestion of Soil
Ingestion of Food Crops""

-------
Unit/Constituent Current Occupational 30-year
Occupational
Risk HQ Risk HQ
NRF-19 - A1W Leaching Bed
(Remedial Action site)
Arsenic 2e-06 -- 2e-06
Americium-241 3e-06 MA 2e-06 NA
Cesium-137 2e-02 NA 8e-03 NA
Cobalt-60 7e-03 NA 1e-04 NA
Plutonium-238 2e-06 NA 1e-06 NA
Nickel-63 -- NA -- NA
Strontium-90 1e-05 NA 6e-06 NA
NRF-12A - Underground Piping Lead ng to S1W Leaching Pit
(Remedial Action site)
Mercury NA -- NA
Cesium-137 9e-02 NA 4e-02 NA
Cobalt-60 6e-03 NA 1e-04 NA
Nickel-63 - NA - NA
Plutonium-244 1e-06 NA 1e-06 NA
Strontium-90 -- NA - NA
30-year Residential 100-year Residential Pathway"1
Risk

3e-05
2e-05
4e-02
7e-04
9e-06
7e-06
9e-03


NA
2e-01
6e-04
3e-06
7e-06
4e-04
HQ Risk HQ

3e-05 -- Ingestion of Soil(b|
Ingestion of Food Crops""
NA 2e-05 NA Ingestion of Soil""
Ingestion of Food Crops""
External Exposure""
NA 9e-03 NA Ingestion of Soil""
Ingestion of Food Crops""
External Exposure""
NA -- NA External Exposure""
NA 5e-06 NA Ingestion of Soil""
Ingestion of Food Crops""
NA 5e-06 NA Ingestion of Food Crops""
NA 2e-03 NA Ingestion of Soil""
Ingestion of Food Crops""


17 NA 17 Ingestion of Food Crops""
NA 4e-02 NA Ingestion of Soil""
Ingestion of Food Crops""
External Exposure""
NA - NA External Exposure
NA 2e-06 NA Ingestion of Food Crops""
NA 7e-06 NA External Exposure""
1
NA 7e-05 NA Ingestion of Soil v
Ingestion of Food Crops""
41

-------
Unit/Constituent

Current Occupational 30-year
Occupational
Risk HQ Risk HQ
30-year Residential
Risk HQ
100-year Residential Pathway'"
Risk HQ
NRF-11'" - S1W Tile Dralnfleld
(Remedial Action site)
Arsenic
Cesium-137
Cobalt-60

2e-06 » 2e-06
4C-06 NA 2e-06 NA
2e-04 NA 3e-06 NA

3e-05
1e-05 NA
1e-05 NA

3e-05 - Ingestion of Soil""
Ingestion of Food Crops""
2e-06 NA External Exposure""
NA External Exposure
NRF-11 (continued) L-Shaped Sump10
(Remedial Action site)
Arsenic
Cesium-137
Cobalt-60
Manganese-54
Plutonium-244
NRF-21A- Old Sewage t
(Remedial Action site)
Arsenic
Antimony
Mercury
N-nitrosodi-n-
propylamine
Cesium-137
Cobalt-60

2e-06 - 2e-06
5e-04 NA 3e-04 NA
7e-05 NA 1e-06 NA
1e-06 NA - NA
NA - NA
lasin
2e-06 -- 2e-06
NA - NA -
NA -- NA
1e-06 NA 1e-06 NA
3e-03 NA 1e-03 NA
1e-04 NA 3e-06 NA

3e-05
1e-03 NA
6e-06 NA
NA
3e-06 NA

3e-05
NA 1.8
NA 27
1e-05 NA
8e-03 NA
1e-05 NA

3e-05 - Ingestion of Soil""
Ingestion of Food Crops""
3e-04 NA Ingestion of Soil
Ingestion of Food Crops""
External Exposure""
NA External Exposure
NA External Exposure
3e-06 NA External Exposure""

3e-05 - Ingestion of Soil""
Ingestion of Food Crops""
NA 1.8 Ingestion of Soil""
NA 27 Ingestion of Food Crops""
7e-04 NA Ingestion of Soil"1!
Ingestion of Groubdwater""
1e-03 NA Ingestion of Soil""
Ingestion of Food Crops""
External Exposure""
NA External Exposure
42

-------
Unit/Constituent Current Occupational 30-year
Occupational
Risk HQ Risk HQ
NRF-43 - Seepage Basin Pump Out Area
(No Further Action site)
Arsenic 2e-06 - 2e-06
Cesium- 137 2e-05 NA 8e-06 NA
NRF-21B - Sludge Drylnci Bed
(Remedial Action site)
Mercury NA - NA
Benzo(a)pyrene . - NA - NA
Cesium-137 5e-04 NA 3e-04 NA
Cobalt-60 6e-05 NA 1e-06 NA
Uranium-235 -- NA - NA
NRF-16 - S1W Radiography Building Collection Tanks
(No Further Action site)
Arsenic 2e-06 •- 2e-06
Benzo(a)pyrene - NA - NA
Cesium-137 1e-04 NA 6e-05 NA
Cobalt-60 2e-05 NA -- NA
Uranium-235 - NA - NA
NRF-66 - Hot Storage Pit
(No Further Action site)
Cesium-137 2e-05 NA 1e-05 NA
30-year Residential
Risk HQ


3e-05
4e-05 NA

NA 37
1e-06 NA
16-03 NA
6e-06 NA
1e-06 NA


3e-05
3e-06 NA
3e-04 NA
2e-06 NA
1e-06 NA


3e-05 NA
100-year Residential Pathway'"
Risk HQ


3e-05 - Ingestion of Soil""
. Ingestion of Food Crops0"
9e-06 NA Ingestion of Food Crops
External Exposure""

NA 37 Ingestion of Food Crops""
1e-06 NA Ingestion of Soil
3e-04 NA Ingestion of Food Crops""
External Exposure""
NA External Exposure
1e-06 NA External Exposure""


3e-05 - Ingestion of Soil""
Ingestion of Food Crops""
3e-06 NA Ingestion of Soil""
8e-05 NA Ingestion of Food Crops""
External Exposure""
NA External Exposure
1e-06 NA External Exposure""
I


2e-06 NA Ingestion of Food Crops
External Exposure""
43

-------
Unit/Constituent Current Occupational 30-year
Occupational
Risk HQ Risk HQ
NRF-80'" - A1W/S1W Radioactive Lino Near BB19
(Remedial Action site)
Cesium- 137 8e-05 NA 4e-05 NA
Cobalt-60 9e-02 NA 2e-03 NA
NRF-32 - S5G Basin Sludge Disposal Bed
(No Action site)
Arsenic 2e-06 - 2e-06
NRF-171" - S1W Retention Basins
(Remedial Action Site)
No risk assessment was performed for this site.
30-year Residential 100-year Residential Pathway1"
Risk HQ Risk HQ
2e-04 NA 4e-05 NA Ingestion of Food Crops""
External Exposure""
9e-03 NA - NA Ingestion of Soil
Ingestion of Food Crops
External Exposure
2e-05 - 2e-05 - Ingestion of Soil""
Ingestion of Food Crops""

a)       Pathways that showed a carcinogenic risk of 1 x 10* or greater risk or a hazard quotient of 1.0 or greater. If no single pathway showed greater than 1 x 106
         risk or a hazard quotient of 10 the pathway that contributes most to the constituent overall risk is shown.
b)       These pathways show a risk greater than 1 x  10° or a hazard quotient greater than 1.0 at the 100-year residential scenario.
c)       A risk management decision was made, based on the conservative nature of the risk assessment, to eliminate mercury as a contaminant of concern for this
         site even though the hazard quotient was calculated as greater than 1.0. (See discussion in Section 4.1.2.6)
d)       NRF-14 and NRF-12B were evaluated as one area because of their close proximity to each other and similar history and discharges.
e)       An unacceptable risk is presumed to exist at these sites based on process knowledge and sampling results from downstream units.
f)        S1W Tile Drainfield and L-Shaped Sump were evaluated separately.

NA      Not Applicable
HQ      Hazard Quotient
-        Risk was below 1 x 10° or hazard quotient was less than 1.0.

-------
  Table 6. Contaminants Eliminated as Contaminants of Potential Concern
 C!f_                                Contaminant with Risk < 1E-06
	   orHQ<1.0	
 NRF-02                                     Chromium
 NRF-11 (S1W Tile Drainfield)                   Dieldrin
 NRF-11 (L-Shaped Sump)                     Americium-241
                                            Americium-243
 NRF-12A                                   Chromium
                                            Americium-241  ~"
                                            Carbon-14
                                            Plutonium-238
                                            Plutonium-239
 NRF-12B, 14-                               Aroclor-1260
                                            Carbon-14
                                            Plutonitum-239
                                            Chromium
 NRF-13                                     Arsenic
                                            Cesium-137
                                            Cobalt-60
 NRF-16                                     Benz(a)anthracene
                                            Benzo(b)fluoranthene
                                            lndeno(1,2,3-CD)pyrene
 NRF-19                                     Chromium
                                            Carbon-14
                                            Plutonium-239
                                            Uranium-234
 NRF-21A                                   Cadmium
                                            Chromium
                                            Silver
 NRF-21B                                   Antimony
                                            Cadmium
                                            Chromium
                                            Silver
                                            Benzo(b)fluoranthene
 NRF-23                                     Cadmium
                                            Chromium
                                            Silver
                                            Benz(a)anthracene
 NRF-43                                     Carbon-14
                                            Plutonium-239
 NRF-79                                     Carbon-14
                                            Manganese-54
 NRF-81                                     Carbon-14
                                            Plutonium-239

                                45

-------
 4.1.2.5
Risk Assessment Uncertainties
 There are many uncertainties associated with the risk assessment calculations. Uncertainties
 are associated with all estimates of carcinogen and noncarcinogen health hazards. These
 uncertainties result from incomplete knowledge of many physical and biological processes and
 assumptions made on such items as land usage and availability of contaminants.  Where
 specific information is not available, it is necessary to make assumptions and/or use predictive
 models to compensate for lack of information. The assumptions, models, and calculations are
 chosen so that the resulting risk and hazard estimates are protective of human health.
 However, these assumptions usually result in a conservative estimate of risk. Table 7 shows
 the uncertainties associated with various aspects of the risk assessment performed for the
 individual sites.
           Table 7. Uncertainties Associated with Individual Site Risk Assessments
       Area
                      Uncertainties
 Effect on Risk
Sampling and
Analysis
     All constituents, or their maximum values, may not
     have been identified.

     A representative concentration may not have been
     obtained where limited sampling was performed.
 Underestimate


Overestimate or
 Underestimate
Concentration
Terms
     Maximum values are used in the risk assessments.


     All risk assessments use one-half the detection
     limits when the constituent is not detected.
  Overestimate
                                                                      Overestimate
Fate and
Transport
     Use of generic modeling parameters may not be
     truly representative of NRF.

     Distribution coefficient values have wide ranges for
     various soil types.

     Chemical compounds are indeterminate.


     Physical parameters of soil on which analysis
     performed not known.

     The presence of oil and organics in the effluent
     complicate fate and transport determination.	
  Overestimate


  Overestimate
                                                                    Underestimate or
                                                                      Overestimate

                                                                    Underestimate or
                                                                      Overestimate

                                                                    Underestimate or
                                                                      Overestimate
GWSCREEN
Modeling (used for
assessing
groundwater
pathway)
     Peak concentration times of constituents that occur
     over 10,000 years in the future are not included in
     the risk assessments.

     GWSCREEN input parameters (i.e., contaminant
     solubility limit, distribution coefficient (Ko), and
     infiltration rate) are considered conservative, but
     contain some uncertainty.

     Maximum source term concentrations are assumed
     for the entire volume modeled for each site.
 Underestimate
Underestimate or
  Overestimate
                                                                      Overestimate
                                          46

-------
       Area
                 Uncertainties
 Effect on Risk
Exposure
Assessment
Assumes residences could be established in areas
that are uninhabitable due to physical or
administrative limitations.

Default exposure values assume maximum possible
exposure times, particularly for the occupational
scenario where exposure times were 8 hours per
day rather than more realistic times of a maximum of
a few hours a week.

The dermal absorption pathway was not included in
the risk assessment calculations.

Withdrawn values from IRIS or HEAST are used in
the risk assessments.

Assumes that maximum constituent concentrations
are present for all pathways.	
  Overestimate
                                                                     Overestimate
                                                                     Underestimate
                                                                   Underestimate or
                                                                     Overestimate

                                                                     Overestimate
Toxicity
Assessment
Use of parent nuclide slope factor plus daughter (D)
rather than adding slopes for both.

Extrapolation of values from nonhuman studies to
humans, from high doses to low doses.

Route-to-route extrapolations are used.
                   Lead was not included in the risk assessment
                   calculations.

                   Chromium was assumed, based on sample data, to
                   be present in the trivalent state and not the more
                   toxic hexavalent state.

                   An assumption is made of the chemical form.
 Underestimate


 Overestimate or
 Underestimate

Underestimate or
  Overestimate

 Underestimate


 Underestimate
                                                 Underestimate or
                                                  Overestimate
Risk
Characterization
Risks are added across constituents and pathways,
although they may not affect the same target organ
or mechanisms of damage.

Assumption that constituents are evenly distributed
at maximum concentrations throughout the source
volume.

Toxicity values for some constituents (chromium.
silver) are based on industrial conditions.

Reference doses and slope factors were not
adjusted from oral to dermal toxicity for the dermal
pathway.          	 	
Underestimate or
  Overestimate
                                                                     Overestimate



                                                                     Overestimate


                                                                    Underestimate
                                         47

-------
4.1.2.6       Individual Site Risk Assessment Conclusions

The INEEL future land use document states that the most likely land use scenario for the area
around NRF will be industrial for the next 100 years. Land use is a consideration when
determining the appropriate level of risks within an area of concern. NRF maintains strict
control over the radiological areas identified in OU 8-08. Adequate management and
operational controls are in place to control exposure at sites that show a potential risk to a
current or 30-year occupational receptor. Cobalt-60 was one of the primary COPC for the
occupational scenarios. However, with a half-life of near five years, the cobalt-60 will have
decayed to insignificant amounts within 100 years which would be the earliest a-residence at
NRF could be expected. Most of the sites that show an elevated risk are subsurface soil
contaminated areas and excavation would be required for exposure to contaminants. NRF-12B,
19, and 14 are outside the NRF security fence, but have separate surrounding fences to prevent
any human contact with the contaminants even though the contaminants are primarily
subsurface.  The risk assessments used default exposure parameters to determine the likely
risk to an occupational receptor.  These default parameters assume the receptor will be in the
area for eight hours a day and 250 days a year.  The default values are conservative compared
to the actual time an occupational receptor would be at the OU 8-08 sites.  The typical
occupational receptor at NRF would rarely visit these sites (i.e., annual environmental
monitoring and sampling, which requires two to four individuals less than eight hours per year,
are the only times individuals enter the areas).  Based on the above information, the 100-year
residential scenario is the scenario of concern.

The contaminants of concern (COCs) are those constituents that show a risk above the NCR
target risk range of 1E-04 to 1E-06 or a hazard quotient greater than 1.0 for the 100-year
residential scenario. Those constituents that show a carcinogenic risk above 1 E-06 or a hazard
quotient above 1.0 for the individual site risk assessments include: arsenic, antimony, mercury,
benzo(a)pyrene, n-nitrosodi-n-propylamine, americium-241, cesium-137, neptunium-237,
nickel-63, plutonium-238, plutonium-244, strontium-90, and uranium-235.

Groundwater risks were evaluated using the GWSCREEN modeling program and by evaluating
samples collected from a network of groundwater monitoring wells (Figure 3).  The
GWSCREEN modeling assessed residual contamination in the soil and the ability of the
contaminants to migrate toward the aquifer. GWSCREEN modeling did not show any
contaminants reaching the groundwater during the 100-year residential scenario, with the
exception of n-nitrosodi-n-propylamine (at 114 years), for the individual OU 8-08 sites that do
not have a current water source to drive contaminants toward the groundwater.  GWSCREEN
used very conservative modeling parameters, however, many of the radiological contaminants
were shown to decay to below risk-based concentrations  prior to reaching the aquifer.

Groundwater samples were also evaluated to assess those contaminants that may have
reached the aquifer because a driving force is currently present (e.g., industrial waste ditch) or
was present at one time (e.g., S1W Leaching Beds). Although some elevated levels of
contaminants have been detected during sampling (see Section  3.4), none of the average
concentration of contaminants were found to be above the stringent maximum contaminant
levels (MCLs) of federal drinking water standards. These MCLs are based on allowable risk
levels established by the EPA. The GWSCREEN and groundwater sampling show the
groundwater pathway is not a pathway of concern at NRF.

Arsenic, antimony, mercury, benzo(a)pyrene, and n-nitrosodi-n-propylamine were eliminated as
COCs for various reasons during risk management decisions. Risk assessment calculations for
all five contaminants were very conservative in nature and likely overestimated the risks.  The
maximum detected concentration for each contaminant was generally used for risk
assessments and it was assumed the entire area was contaminated at that level. Antimony and

                                         48

-------
n-nitrosodi-n-propylamine were COPCs at one site based on one sample collected below a 10
foot depth, which is the depth that would eliminate most exposure pathways. Mercury was
assumed to be in the most toxic form (methylmercury) even though this is very unlikely at NRF.
Benzo(a)pyrene risks were calculated to be equal to or slightly greater than 1E-06 at two sites
and sample results may not have been representative of the areas sampled (e.g., sample
results from sediment in a concrete enclosed sump were used to estimate surrounding soil
contamination even though there was no evidence of sump leakage).  There was no known
process release of arsenic at NRF and the background levels, which are used to screen
potential contaminants, may be higher than published.  In addition, the site with the highest
calculated arsenic risk is an area where remedial action was anticipated (NRF-42B).

A risk assessment was not performed for lead, which was detected at one location (NRF-12B)
above EPA recommended screening levels for lead cleanup.  Lead was retained as a COC.

Those sites that contain or potentially contain one or more COC above the target risk range are
identified as sites of concern.  The sites of concern include:

       NRF-11, SIWTile Drainfield and L-shaped Sump
       NRF-12A, Underground Piping to Leaching Pit
       NRF-12B, S1W Leaching Pit
       NRF-14, S1W Leaching Beds
       NRF-17, S1W Retention Basins
       NRF-19, A1W Leaching Bed
       NRF-21A, Old Sewage Basin
       NRF-21B, Sludge Drying Bed
       NRF-80, A1W/S1W Radioactive Line Near BB19

NRF-17, NRF-80, and the drainfield portion of NRF-11 were the only sites that did not show a
risk above 1E-04.  They are retained as sites of concern because of their potential to contain
COCs above risk-based levels. NRF-80 is an underground pipe and NRF-17 is a concrete
basin and both may have leaked in  the past. The drainfield portion of NRF-11 was used for
radioactive discharges in the early 1950s.  A risk assessment for the soil below NRF-17 (S1W
Retention Basins) was not performed because of the lack of sample data and the difficulty
associated with collecting samples in this area. Sampling results from NRF-80 and NRF-11
(drainfield portion) may not be representative of present site conditions because NRF-80
represents potential sporadic contamination, making characterization sampling very difficult, and
the underground piping at NRF-11 could not be found using geophysical surveys prior to
sampling. NRF-17 and NRF-80 are retained as sites of concern because of the uncertainty
associated with the potential leaks.  The drainfield portion of NRF-11 is also retained as a site of
concern because of the uncertainty with the location of the underground piping and associated
contaminated soil. At each location, contamination above risk-based concentrations is
presumed based on process knowledge and sampling performed downstream of sites NRF-17
and NRF-80.

For sites NRF-13, 32, and 79, the low risks are due to the small amounts  of contaminants
present.  For sites NRF-02, 16, 23, 43, 66, and 81 the low risks are due to the relatively small
amounts of contaminants present, the protective nature of present site conditions (contaminants
inaccessible because of structures, soil covers, or administrative controls), and the assumption
of 100 years of industrial control.
                                         49

-------
4.1.3  New Site Risk Assessments

Track 1 investigations were performed for sites NRF-82 and NRF-83. The assessments
determined that a source was present at each site, but current site conditions limit exposure to
the sources. For NRF-82, industrial control for 100 years is assumed and this results in a low
estimated risk. For NRF-83, no exposure route is present from the contaminant to a receptor
because the contamination is presently below a concrete pad. Since the assessment of these
two areas was made after the NRF Comprehensive RI/FS, an additional evaluation was made
to determine the potential impact of these two sites to the cumulative risk assessment of NRF.
Each site was determined not to impact the cumulative risk assessment because^of the small
amount of contamination present at NRF-82 and the lack of an available exposure route at
NRF-83.

4.2    Ecological Risk Assessment

A Screening Level Ecological Risk Assessment (SLERA) evaluated the known or potential sites
at NRF where previous investigations and sampling had  determined that a source of
contamination remained. Risks were calculated for six representative wildlife species based on
an INEEL guidance manual for performing SLERAs. Organic, inorganic, and radiological
constituents were evaluated through the ingestion and external exposure pathways.
Assessment results were used to compare risks.  Calculated screening level quotients were not
considered to be additive because of the potential for compounding the uncertainty.

Based  on the results of samples collected since 1987 and toxicity values used at other INEEL
facilities, the metals arsenic, lead, and  mercury were the risk drivers for ecological receptors at
NRF. Radionuclides and organics were also contributors to the overall ecological risk, but the
risks were very low.  No additional ecological risk assessment was deemed necessary for
radionuclide and organic compounds.  NRF-23 (Sewage Lagoons) presented the highest
potential ecological risk based on accessibility, attractiveness, number of constituents present.
and associated risk.

The results of the SLERA were also used to select receptors for additional ecological risk
assessment. Receptors were selected on the basis of potential exposure  and perceived value
to society. The SLERA determined that deer mice, bald eagles, and mallard ducks were the
primary receptors of concern. Deer mice were calculated to receive some of the highest
exposures in the vicinity of NRF. Bald  eagles were selected because they prey upon deer mice,
are a threatened species, and are perceived as a valued species by the general public.
Mallards were a receptor of concern because they breed in the vicinity of the sewage lagoon.
can be prey for bald eagles, and are a game species.

The ecological risk assessment addressed the effects of arsenic, lead, and mercury on the three
receptors identified in the SLERA.  Exposure values for these metals were calculated for each
receptor and compared to a range of exposure values that resulted in no observable adverse
effects to laboratory test animals. These comparisons were qualitatively assessed, since no
studies were found that directly measured the effects of arsenic, lead, and mercury on the
receptor species. The weighted average concentration for each of these constituents at NRF
was also compared to background levels. The risks associated with the exposures to the
ecological receptors are characterized  as low. Although there are uncertainties associated with
this screening assessment, the  results indicate that no additional actions are required due to
estimated risks to ecological receptors.
                                          50

-------
4.3    Cumulative Risk Assessment

A cumulative risk assessment was performed to determine if there are additional risks due to
the cumulative, or additive, effects associated with having several individual sites near one
another.  The cumulative risk assessment evaluated all sites previously assessed and the
OU 8-08  sites assessed during the NRF Comprehensive RI/FS. This included the 13 COCA
sites evaluated prior to the FFA/CO and the 10 sites in OUs 8-04, 05, and 07 associated with a
previous  ROD. Each site was evaluated and screened out of the process if no constituent
source was present or if the constituent concentrations were below screening levels.  Screening
levels corresponded to an excess cancer risk of 1E-07 or a hazard quotient of 8:1.

The 100-year future occupational worker and 100-year future resident were the scenarios
considered for the cumulative risk assessment.  The exposure pathways considered were
inhalation of fugitive dust, ingestion of groundwater, and direct radiation exposure.  The soil
ingestion and food crop ingestion pathways were not considered because they are  not likely to
occur from more than one release site at a time.

The cumulative risk assessment identified that chromium, n-nitrosodi-n-propylamine, and
cesium-137 are the only constituents that showed a calculated risk value greater than 1E-06 or
a hazard  quotient greater than 1.0 for the scenarios evaluated. Although chromium and
n-nitrosodi-n-propylamine showed elevated risk values during the 100 year scenarios, they are
not considered COCs at NRF. A hazard quotient of 3.5 through the inhalation pathway was
calculated for chromium. The concentration source term used for chromium was very
conservative (i.e.,  maximum values from most sites).  Considering the conservative nature of
the cumulative risk assessment and the fact that the hazard quotient for chromium was less
than an order of magnitude greater than 1.0, a risk management decision was made that
chromium is not a  COC.  N-nitrosodi-n-propylamine was detected at only one location at the 20
foot depth.  It was eliminated as a COC during the individual site risk assessment.  The
estimated risk value for cesium-137 through the direct exposure pathway is 2E-4 for the
occupational scenario and 1E-3 for the residential scenario. Cesium-137 was identified as a
COC in the individual site risk assessments.

In addition to the uncertainties identified in Section 4.1.2.5 for the individual site risk
assessments, there are uncertainties associated with the cumulative risk assessment.  To
assess cumulative effects, theoretical areas were defined that represented the total area of
sites.  The concentration for each constituent in the theoretical area (the source term) was then
estimated using a  weighted average of the highest concentration found in each area.  This is a
very conservative source term estimate. Additionally, the groundwater transport model tends to
overestimate the groundwater concentration that further adds to the conservatism of the risk
assessment  calculations. The estimated risk values are believed to overestimate the risk from
these areas.

The cumulative risk assessment shows that the individual risk assessments do not
underestimate the risk. No additional COCs were identified when considering cumulative
effects from  the many individual sites at NRF that would impact decisions made on  a site by site
basis.  Actions taken on individual sites will be adequate for WAG 8 as a whole.  The cumulative
assessment  also determined that the decisions made for the 13 COCA sites (all No Action) and
the 10 sites associated with a previous ROD (three landfill covers and seven No Actions) were
appropriate and no additional action is necessary for the sites.
                                          51

-------
4.4    Risk Assessment Conclusions

The risk assessment process described above identified nine sites of concern (all of which are
OU 8-08 sites) that have or potentially have unacceptable risks to human health. In addition, 55
sites were found to have no risk or an acceptable risk. Sixteen of the 55 sites had no hazardous
source present and, therefore, no risk. Twenty-seven of the 55 sites have a low or acceptable
risk because of the small amount of contaminants present or potentially present. Twelve of the
55 sites have a low risk primarily because of site conditions (industrial control assumed for 100
years or no exposure route from contaminants to receptors are present). The cumulative
assessment did not identify any additional sites of concern and concluded that the decisions
made for 23 sites (13 COCA sites and 10 sites from a previous ROD) were appropriate. The
ecological risk  assessment determined that risks associated with exposures to ecological
receptors are low, indicating no additional actions are required due to estimated risks to
ecological receptors. The sites of concern are shown on Figure 4 with respect to NRF.
                                          52

-------
Figure 4. Overhead Photograph of Sites of Concern at the Naval Reactors Facility



                                   53

-------
5.0    Description of Alternatives

Sections 5.0 and 6.0 of this ROD are applicable to the nine sites of concern identified in Section
4.0.  This section describes the alternatives considered to address the risks associated with the
nine sites of concern. Section 6.0 gives a summary of the comparison of the alternatives.

5.1    Remedial Action Objectives

Remedial Action Objectives (RAOs) are medium-specific goals established to protect human
health and the environment. Medium-specific means soil, air, or groundwater. -The RAOs
include contaminants of concern (COCs), exposure routes and receptors, and an acceptable
risk for each exposure route.  The RAOs are used to help identify potential remedial action
alternatives. The RAOs for OU 8-08 are protective of ecological receptors as well as  human
health. The media of concern for OU 8-08 is soil.  Infiltration of contaminants to the
groundwater is not a pathway of concern.  The 100-year future residential scenario was used for
the development of RAOs because controls are presently in place to protect current and future
occupational workers and NRF is expected to remain an industrial site for at least the next 100
years.  The rationale for the 100-year future residential scenario being the scenario of concern
is given in Section 4.1.2.6. The RAOs for OU 8-08 are as follows:

For Human Health Protection

•      Prevent external gamma radiation exposure from  all radionuclides of concern that
       exceed a total exposure pathway excess cancer risk of 1 in 10,000 for the future
       100-year residential receptor.

•      Prevent ingestion of soil and food crops contaminated with radionuclides of concern that
       exceed a total pathway excess cancer risk of 1 in  10,000 for the future 100-year
       residential receptor.

•      Prevent exposure to soil contaminated with lead that exceeds the EPA recommended
       screening level of 400 ppm for lead cleanup.

For Environmental Protection

•      Prevent erosion or intrusion by resident plant or animal species in contaminated soils
       that could cause the release of contaminated soils.

•      Prevent exposure to COCs that may cause adverse effects on resident species
       populations.

Specific remediation goals for the  COCs were established based on the RAOs. The RAOs
provide a target risk from which risk-based concentrations can be established. Generally,
CERCLA risk management decisions are based on carcinogenic excess risk levels in the range
of 1 chance in 10,000 to 1 chance in 1,000,000. Because of the conservative nature of the risk
assessment assumptions used to  calculate a corresponding soil concentration, a risk
management decision was made to use the 1 in 10,000 excess carcinogenic risk as the target
risk for calculating risk-based soil concentrations. Table 8 shows the COCs, the exposure
routes of concern, and the soil concentration for each constituent corresponding to a 1 in 10,000
excess carcinogenic cancer risk (except for lead which reflects a corresponding soil
concentration that is an EPA recommended screening level for lead cleanup) for the future
100-year residential scenario.  Other exposure routes are available for the COCs shown on
Table 8, but only those routes with an excess risk greater than 1 in 1,000,000 (1E-06) are


                                          54

-------
shown since a risk less than 1E-06 would not significantly contribute to the overall risk
associated with the COC.

Table 8 also shows the maximum concentration of each COC detected at each site of concern
during characterization sampling performed in 1991 and 1992 or NRF Comprehensive RI/FS
sampling performed in 1996.  The bold numbers on Table 8 represent those contaminants
present above a risk-based concentration. Although NRF-11 (S1W Tile Drainfield portion),
NRF-17, and NRF-80 do not show the presence of contaminants above risk-based
concentrations, indirect evidence suggests that contaminants are present above risk-based
concentrations.                                                        —'

The three primary contaminants of concern are lead, cesium-137, and strontium-90, which were
the only contaminants detected above risk-based concentrations. Remediating the soil to
specific lead, cesium-137, and strontium-90 soil concentrations would reduce the risk
associated with'those constituents and in all likelihood would reduce the other contaminants'
risk values. For example, the maximum detected concentrations of americium-241, nickel-63,
plutonium-238, and plutonium-244 all occurred in areas where cesium-137 was above cleanup
levels.

Remediation goals, which generally refer to a specific contaminant concentration, are
established to meet the RAOs and are based on lead, cesium-137, and strontium-90
concentrations. The remediation goals for OU 8-08 are 16.7 pCi/g of cesium-137, 45.6 pCi/g of
strontium-90, and 400 ppm lead. The remediation  goals are based on human health risks and
are also protective to ecological receptors. As stated in Section 4.2, the ecological risk
assessment concluded no additional action above those actions taken for protection of human
health was necessary due to estimated risks to ecological receptors.

5.2    Summary  of Alternatives

The NRF Comprehensive Feasibility Study identified four remedial action alternatives to be
considered for detailed analysis. These alternatives, with the exception of the No Action
alternative, meet the RAOs, provide overall protection of human health and the environment,
meet ARARs, and are cost effective.  The four remedial action alternatives are as follows:

•      Alternative 1:  No Action

•      Alternative 2:  Limited Action

•      Alternative 3:  Limited Excavation, Disposal, and Containment

•      Alternative 4:  Complete Excavation and Off-site Disposal

5.2.1   Alternative 1:  No Action

The National Contingency Plan (NCR) requires consideration of a no action alternative to serve
as a baseline for evaluation of other remedial alternatives.  No land-use restrictions, controls, or
active remedial measures are implemented at the site under this alternative beyond the
projected Federal  government 100-year institutional control period.  Thus, contamination is
attenuated only through radioactive decay processes.  Current monitoring and radiological
controls would continue during the institutional control period, which is the time frame that NRF
remains an industrial site.
                                          55

-------
	Table 8. Risk-based Soil Concentrations and Maximum Concentrations (pCi/g or ppm) of COCs Detected at Sites of Concern


 Risk-based Soil              |_ead(b|    Am-241    Cs-137     Np-237     Ni-63      Pu-238    Pu-244     Sr-90      U-235
 Concentrations''
Direct Contact
External Exposure
Ingestion of Soil
Food Crop Ingestion
400(c)
NA
NA
NA
NA
895
283
301
NA
16.7
24,860
164
NA
NA
NA
19.8
NA
NA
NA
15,846
NA
NA
590
1,153
NA
3.3
NA
NA
NA
NA
15,418
45.6
NA
13.2
NA
NA
Site of Concern
NRF-11 SIWTileDrainfield
L-Shaped Sump
NRF-12A
NRF-12B
NRF-14
NRF-17(d)
NRF-19
NRF-21A
NRF-21B
NRF-80
Bold indicates concentration of
ND - Not Detected
NA - Not Applicable
11.1
13.0
13.0
1,140
31.5
89
18.4
150
75
14
ND
0.42
0.60
0.15
5.9
ND
20
ND
ND
ND
contaminant detected
0.3
45.98
7,323
1,600
2,040
1.1
1,390
229
43.9
ND
ND
ND
ND
ND
0.79
ND
ND
ND
ND
ND
9.96
ND
329.06
171.40
730
ND
730
7.74
4.59
5.48
ND
ND
0.60
0.15
5.9
ND
20
ND
ND
ND
ND
0.09
0.24
ND
ND
ND
ND
ND
ND
ND
ND
ND
35.35
37.30
83
ND
750
2.02
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
0.17
ND
above a risk-based concentration.
(a) Concentrations correspond to a 1 x 10* carcinogenic risk.
(b) Lead results derived from total metals analysis.
(c) EPA recommended screening level for lead cleanup.
(d) Sample results were from soil adjacent to the retention basins and not from suspected
contamination
below the basins.

I
I



-------
The no action alternative would be easily implemented without any additional costs. However,
the risk assessment performed for the OU 8-08 sites of concern indicates the presence of
unacceptable risks to human health and the environment and therefore, the no action alternative
is ineffective  and does not meet the RAOs.

5.2.2  Alternative 2:  Limited Action

Alternative 2  consists of the following institutional controls to protect human health and the
environment  against potential risks associated with OU 8-08 sites of concern:

       Long-term monitoring
       Fencing and/or other barriers
       Land  use restrictions
       Existing cover inspection and maintenance
       Erosion control

Long-term monitoring would be performed at all sites. Monitoring would include continued
sampling of soils near the sites of concern and groundwater sampling.  Specific monitoring
parameters would be established during the remedial design phase, but would likely include
radiological groundwater sampling from present monitoring wells. Such monitoring activities
would be performed concurrently with any other ongoing monitoring programs at NRF and the
INEEL. The monitoring would continue through the institutional control period, which is the time
frame that NRF remains an industrial site.

Access to the INEEL is currently restricted for purposes of security and public safety. Since the
location of all the OU 8-08 sites are within the boundaries of the INEEL, site-wide access
restrictions would limit accessibility.  In addition, the existing double security fence surrounding
NRF encloses all of NRF-17, 21B,  and 80, and portions of NRF-11 and 12A. The existing
security fence would be maintained as necessary during the control period.  Installation of
additional fences or relocation of existing fences may also be necessary.  Other access control
measures may include (but are not limited to) warning signs, property border signs, land  use
restrictions, and establishing training requirements for persons allowed access. A description of
the areas where access  would be restricted, the specific controls (e.g., fences, signs) that would
be used to ensure that access would be restricted, the types of activities that would be
prohibited in certain areas (e.g., excavation), and the anticipated duration of such controls,
would be determined during the remedial design phase and would be incorporated into the
Bettis Atomic Power Laboratory Site  Development Plan (SDP). This information would be
submitted to the EPA and IDHW once it has been  placed in the SDP. As appropriate, NRF
would also provide the Bureau of Land Management or other Federal agencies the detailed
description of the controls identified above.

Maintenance of surface integrity, including repairing effects of subsidence and erosion, would
be performed as necessary to prevent exposure of subsurface contaminants. Maintenance
crews would use the same type of native soil presently at NRF. Erosion control would be
maintained by grading surface areas to provide drainage and runoff control, and  revegetation
may prevent erosion of existing cover materials.

The limited action alternative is considered to be easily implemented for both the short- and
long-term, since the specified actions are essentially a continuation of the existing management
practices conducted at the OU 8-08 sites of concern. The costs associated with  this alternative
are primarily due to environmental monitoring activities.  Soil cover maintenance, fence
maintenance, and erosion control would be performed only on an as-needed basis.
                                           57

-------
This alternative is generally considered to be effective for the protection of human health and
the environment. However, after the institutional control period of the INEEL is discontinued,
risks to human health and the environment would be dependent on access restrictions placed
around the sites of concern.  Assuming access restrictions are maintained even after the end of
the institutional control period and the ability to enforce the access restrictions exists. Alternative
2 is considered effective for protection of human health  if there is no degradation of the existing
cover material. Alternative 2 may not be as effective to  the protection of ecological receptors,
since small animals may burrow into the soil or plants may establish residence in the cover
material  The approximated time to implement this alternative would be one year.
                                                                      —s
5.2.3 Alternative 3:  Limited Excavation, Disposal,  and Containment

Alternative 3 consists of the following actions to isolate the contaminated soil at OU 8-08 sites of
concern:

      Excavation using standard techniques
      Verification sampling
      Transportation
      Contamination control
      On-site consolidation
      Containment with engineered earthen cover
      Site restoration
      Institutional controls
      - Short-term monitoring
      - Long-term monitoring
      - Fencing and/or other barriers
      - Land use restrictions
      - Cover inspection and maintenance
      - Erosion control

This alternative removes soil and debris from six sites and consolidates the soil at NRF-14
(S1W Leaching Beds). An estimated 133,000  cubic feet of soil would be excavated of which an
estimated 58,000 cubic feet would be contaminated above remediation goals and placed in
NRF-14.  Approximately 3,130 linear feet of underground piping would be removed. An
engineered cover would be placed over NRF-14 and NRF-12B, which are adjacent to each
other. Another cover would be placed over NRF-19. This alternative requires  excavating
contaminated soil, pipes, and concrete structures from the following sites: NRF-11, 12A, 17,
21 A, 21B, and 80. Conventional excavation equipment  has been demonstrated to be effective
in retrieving radioactive soil and debris in other INEEL remedial responses. After excavation.
these sites would be filled with clean soil.  In addition, the pipes leading to NRF-14 and 19
would be excavated. The pipe and concrete structures, which would have been removed during
decontamination and dispositioning work regardless of remedial actions, would be managed
and disposed of under current NRF radioactive waste management policies. Presently, this
involves disposal at the Radioactive Waste Management Complex (RWMC) for radiologically
contaminated debris or disposal per the INEEL Site Treatment Plan for mixed  radiological and
hazardous debris. NRF-12B (S1W Leaching Pit), NRF-14 (S1W Leaching Beds), and NRF-19
(A1W Leaching Bed) represent the sites with the greatest volumes and concentrations of
contaminated soil. The soil at NRF-128, 14, and 19 would not be removed.

A single area of contamination (AOC) will be defined to  include the areal extent of contiguous
contamination which will encompass both the excavation and consolidation sites.  The specific
boundaries of the AOC would be identified and refined in subsequent documents such as the
Remedial Design/Remedial Action Scope of Work and the Remedial Action Work Plan.  Under
this alternative, contaminated soils are not expected to be removed from the AOC. Movement

                                          58

-------
and stock-piling of contaminated soils within the AOC for purposes of consolidation during
remedy construction is not intended to trigger Idaho Hazardous Waste Management
Act/Resource Conservation and Recovery Act land disposal restrictions. However, in the
unlikely event that the volume of contaminated soils exceeds the capacity of the leaching beds,
contingency actions could include disposal of contaminated soils outside of the AOC (i.e.,
probably away from the NRF).  In such a case, the soils would be subject to the same waste
management requirements that pertain to the contaminated debris leaving the AOC.

Real time gamma surveys could be used to delineate the extent of contamination to be removed
as the excavation proceeded. Sodium iodide or germanium detectors could be~Calibrated to
detect radiological contamination present at concentrations above remediation goals.
Cesium-137, which is a gamma emitter, is the primary COC at each site. As deemed necessary
in the remedial design phase, laboratory analysis of an agreed upon number of representative
grab samples would be required to verify the  real-time assessment. Real-time surveys can
reduce the volume of clean soil  removed and mixed with contaminated soil.

Current radiological controls practices could be used to reduce radiation exposure to the
operator. Radiological controls  could consist of limiting the amount of time an operator can
work in the area, using containment structures around the contaminated material to prevent the
spread of contaminants, ensuring containment structures around the contaminated material
have a negative pressure to prevent airborne release of contaminants, wearing personnel
protective equipment, and using distance and shielding to reduce radiation exposure.

Debris would be sampled during excavation for characterization purposes to ensure it is not
RCRA hazardous. No RCRA hazardous debris is expected at any of the sites of concern. If
sampling shows the debris to be RCRA hazardous and radiologically contaminated, then the
debris will be disposed of as mixed waste per the INEEL Site Treatment Plan. The debris would
be packaged according to the Site Treatment Plan requirements.

During excavation, dump trucks would most likely be positioned near the excavation site such
that backhoes can place the contaminated soil directly into the dump truck.  Possible dust
suppression techniques used during excavation include:  keeping the soil wetted during
excavation activities, performing excavation in tented enclosures, halting excavation work during
windy conditions, and keeping man-made covers over contaminated soils.  The dump truck may
contain tarps to prevent the release of soil in transit.  The dump truck will then transport the soil
to the S1W Leaching Beds (NRF-14) for on-site consolidation. The leaching beds contain dirt
ramps to allow the dump truck to drive to the  bottom of the leaching beds and empty the soil.
Other means of transporting the soil, such as directly with a backhoe or in boxed containers,
would be considered during the remedial design phase of the action.  The estimated
contaminated soil volume from all the proposed excavation areas would fit into the present
leaching beds. All actions will require radiological controls as discussed above. Contingency
actions would include off-site (away from NRF) disposal of soil that exceeds the capacity of the
leaching beds or continued consolidation at the beds above surface level, although these are
unlikely to be necessary.

Verification sampling, consisting of radiation surveys and soil sampling and analysis, would be
performed to confirm that all contamination exceeding remediation goals was removed from the
site of concern. Following the removal of the contaminated soil from the sites, contouring to
conditions of the surrounding landscape and filling excavated areas with clean materials would
restore each site.  Backfilled areas would be compacted to prevent future subsidence. Sites
would be revegetated as appropriate.

The engineered cover could consist of geologic materials including native soil, gravel, basalt
cobbles, and rip-rap.  Variations from this conceptual design are possible based on layer

                                          59

-------
thickness, layer material, layer order, location of a potential biobarrier in the cap profile, and
other considerations. The conceptual design would be developed during the remedial design
and modified as needed to meet defined functional and operational requirements, with the
concurrence of regulatory agencies. The engineered barrier will be designed for use in arid
climates, but may include designs limiting infiltration.

Specific performance goals (as given in 10 CFR 61, Licensing Requirements for Land Disposal
of Radioactive Waste) are established for the cover and include:

•      Installation of covers that are designed to discourage any individual frorrTinadvertently
       intruding into the contaminated soil, or from contacting the contaminated soil at any time
       after active institutional controls over the sites are removed, up to the design life of the
       covers.
•      Application of maintenance and surface  monitoring programs for the containment
       systems capable of providing early warning of releases of radionuclides from the sites,
       before they leave the site boundary.
•      Institution of restrictions limiting land  use to industrial applications for at least 100 years.
•      Implementation of surface water controls to direct surface water away from the
       contaminated soil.
•      Elimination, to the extent practicable, of the need for ongoing active maintenance of the
       sites following closure so that only surveillance, monitoring, or minor custodial care  are
       required.
•      Placement of adequate cover to inhibit erosion by natural processes for the specified
       design lives of the cap.
•      Incorporation of features to inhibit biotic  intrusion into the contaminated soil areas.

Institutional controls would be implemented after the construction of the covers.  Long-term
monitoring, fencing and/or other barriers, land use restrictions, cover inspection and
maintenance, and erosion  control as explained for Alternative  2, Limited Action, would be
applicable. A description of the areas where access would be restricted, the specific controls
(e.g., fences, signs) that would be used to ensure that access  would be restricted, the types of
activities that would  be prohibited in certain areas (e.g., excavation), and the anticipated
duration of such controls, would be determined during the remedial design phase and would be
incorporated into the SDP.  This information  would  be submitted to the EPA and IDHW once it
has been placed in the SDP. As appropriate, NRF would also provide the Bureau of Land
Management or other Federal agencies the detailed description of the controls identified above.

Radiation surveys would be required at the covered sites. Additional surveys across and
around the sites would be performed to detect radionuclides potentially mobilized by burrowing
animals, erosion, or other natural processes. Cover integrity monitoring would be performed
across and around the cover sites to assess maintenance requirements due to erosion,
cracking, or other observable deterioration of the cover.

Maintenance to the protective cover would be performed based on the results of routine cover
inspections. The protective cover would likely be inspected monthly during the first 12 months
because potential problems (such as settling or subsidence) are most likely to occur within  this
period. After the initial 12 month period, cover inspection may be performed annually.
Maintenance requirements may include periodic removal of undesirable vegetation and
burrowing animals and filling animal burrows. In addition, unacceptable erosion or subsidence
would require repair of the affected area. Operations and maintenance goals will be defined
during remedial design.

The short-term effectiveness of this alternative for protecting human health is judged to be
moderate.  Equipment operators and site personnel could receive minor radiological exposures

                                          60

-------
during removal activities, however, these exposures could readily be controlled using standard
radiation control measures. Short-term protection of the environment is expected to be high
because adequate contamination control measures are specified. Toxicity and volume of
contaminants would not be reduced by this alternative.

This alternative is considered to be highly effective in preventing long-term exposure at the
covered areas. The shielding effects of the various layers of natural media would reduce
surface radiation exposure. The covers are designed for long-term isolation with minimal
maintenance requirements. The engineered cover for this alternative would be effective in
preventing biointrusion and add a high level of inadvertent human or animal intruder protection,
by both the mass and impenetrability of material overlying contaminated soils.

Installation costs of this engineered cover are financially feasible. Construction materials are
readily available on-site.  Long-term inspection and maintenance requirements are considered
minimal.  Long-term monitoring requirements, including radiation surveys, would be easily
implemented during the institutional control period. The approximate time to implement this
alternative would be three years.

5.2.4  Alternative 4: Complete Excavation and Off-site Disposal

Alternative 4 consists of the following actions to isolate the contaminated soil at OU 8-08 sites of
concern:

       Excavation using standard techniques
       Verification sampling
       Transportation
       Contamination control
       Off-site (away from NRF) disposal
       Site restoration

This alternative would require excavating contaminated soil, pipes, and concrete structures from
all the OU 8-08 sites of concern and disposing of the soil and debris to an off-site (away from
NRF) location.  An estimated 1,171,000 cubic feet of soil would be excavated of which an
estimated 447,000 cubic feet would be contaminated above remediation goals requiring off-site
disposal. Approximately 3,130 linear feet of pipe would be removed. The procedures and
equipment used for excavating, surveying, and sampling soil would be the same as
Alternative 3.  Since NRF-12B, 14, and 19 would also be excavated, additional excavating,
surveying, and sampling of the soil would  be required. In addition, the soil would be
characterized as described for the debris in the Alternative 3 discussion since the soil would be
removed from  the area of contamination (AOC).  Filling excavated sites with clean soil,
disposing of contaminated debris, and using currently practiced radiological controls would be
the same as Alternative 3.

Similar to Alternative 3, dump trucks  could be used to transport the contaminated soil. The
dump truck would transport the soil to a transfer station or the disposal location.  Actual shipping
methods and packaging requirements would be determined during remedial design.  Packaging
may include placement of the soil in 4 foot wide by 4 foot deep by 8 foot long box prior to
transportation  away from NRF or the soil may be directly transported to the disposal facility by
truck.

Disposal may occur at a proposed INEEL soil repository. The status of this facility is uncertain.
The facility is currently projected to be south of the Idaho Nuclear Technology and Engineering
Center (INTEC) (formerly the Idaho Chemical Processing  Plant (ICPP)), which is only a few
miles from NRF. The projected facility has not yet received funding or approval from DOE or
                                           61

-------
regulatory agencies.  A decision on the proposed disposal facility is expected in 1999. This
alternative would require a secondary plan if the facility were not approved or available for
remedial actions occurring at NRF. Secondary disposal options include the RWMC, Test
Reactor Area (TRA) Warm Waste Pond, or an off-INEEL disposal facility such as Envirocare in
Utah.

The short-term effectiveness of this alternative for protecting human health is judged to be
moderate. Complete excavation, which includes excavating all sites of concern rather than the
limited excavation of Alternative 3 that does not excavate all sites of concern, would require the
operators to be on-site longer and potentially exposed to contaminants for a  longer duration.
Equipment operators and site personnel could receive minor radiological exposures during
removal activities, however, these exposures could readily be controlled using standard
radiation control measures. Short-term protection of the environment is expected to be high
because adequate contamination control measures would be specified.  Long-term protection of
human health and the environment is judged to be highly effective because contaminated soil
would no longer exist at any NRF site. Toxicity and volume of contaminants would not be
reduced by this alternative.

Short-term technical implementability of this alternative is considered moderate if the proposed
INEEL soil repository is approved and available for NRF soil generated from  remedial actions.
Proposed excavation equipment is currently available.  Characterization, packaging, and
transportation of the contaminated material can be performed using currently available
technology.  Long-term implementability is considered high, since the contamination is removed.
Long-term inspection and maintenance are considered minimal. Long-term environmental
monitoring other than what is currently performed would not be required because the
contaminant source would be removed.

The short-term costs of this alternative would be high. Significant costs would be incurred for
safety analysis, satisfying ARARs, and operational and capital costs.  The primary capital costs
associated with this alternative would be disposal facility fees and transportation costs.
Compared to other disposal options, the potential INEEL soil repository disposal costs are
considered moderate. Operations and maintenance costs would be high during the excavation
and disposal period primarily because of the radiological considerations.  Long-term monitoring
costs would be low assuming all contamination could be removed from the sites of concern.
The approximate time to implement this alternative would be five years.
                                          62

-------
6.0    Summary of Comparative Analysis of Alternatives

The alternatives discussed above were evaluated using the nine criteria as specified by
CERCLA:

•      Overall Protection of Human Health and the Environment addresses whether a
       remedy provides adequate protection of human health and the environment and
       describes how risks posed through each exposure pathway are eliminated, reduced, or
       controlled through treatment, engineering controls, or institutional controls.

•      Compliance with ARARs addresses whether a remedy will meet all of the ARARs
       under federal and state environmental laws and/or justifies a waiver.

•      Long-term Effectiveness and Permanence refers to expected residual risk and the
       ability of a  remedy to maintain reliable protection of human health and the environment
       over time, once cleanup goals have been met.

•      Short-term Effectiveness addresses any adverse impacts on human health and the
       environment that may be posed during the construction and implementation period and
       the period of time needed to achieve cleanup goals.

•      Reduction of Toxicity, Mobility, or Volume through Treatment addresses the degree
       to which a  remedy employs recycling or treatment that reduces the toxicity, mobility, or
       volume of the contaminants of concern, including how treatment is  used to address the
       principal threats posed by the site.

•      Implementability is the technical and administrative  feasibility of a remedy, including
       the availability of materials and services needed to implement a particular option.

•      Cost includes estimated capital and operation and maintenance costs, expressed as net
       present-worth costs.

•      State Acceptance reflects aspects of the preferred alternative and other alternatives
       that the state favors or objects to and any specific comments regarding state ARARs or
       the proposed use of waivers.

•      Community Acceptance summarizes the publics general response to the alternatives
       described in the proposed plan and in the RI/FS, based on public comments received.

Each of the four alternatives were evaluated against the nine evaluation criteria identified above
The criteria are subdivided into three categories: (1) threshold criteria that mandate overall
protection of human health and the environment and compliance with ARARs; (2) primary
balancing criteria that include long- and short-term effectiveness, implementability, reduction in
toxicity, mobility, or volume through treatment, and cost; and (3) modifying criteria that measure
the acceptability of alternatives to state agencies and the community.  The selected remedial
action alternative must meet the threshold criteria. The balancing criteria are used in refining
the selection of the candidate alternatives for the sites. The modifying criteria are used in the
final evaluation of remedial alternatives and factors include the elements of the alternatives that
are supported, not supported, or have strong opposition. The following sections summarize the
detailed analysis of the four alternatives against the nine evaluation criteria.
                                         63

-------
6.1    Overall Protection of Human Health and the Environment

Alternative 1 (No Action) does not meet the RAOs. There would be no reduction in long-term
risk to the public. The risk assessment performed in the NRF Comprehensive RI/FS shows that
the no action alternative would not meet the criteria for overall protectiveness because some of
the calculated risk values represent an increased cancer risk greater than the NCR upper limit of
1 in 10.000. With this alternative, the potential exists for direct exposure to humans.  No surface
water controls would exist to prevent erosion  and exposure of contaminants to the environment.

Alternative 2 (Limited Action) initially meets the human health protection RAOs by providing
restrictions on access and land use to prevent direct contact with the soil.  This alternative
would also provide early detection of potential contaminant migration although this is not
expected. Alternative 2 would also restrict access to the areas by larger animals such as deer
and antelope, but may not restrict contact with the soil by smaller animals that could easily
navigate through the established barriers.  This alternative would also not prevent erosion or
intrusion by plant species unless additional care is taken to repair erosion and prevent plants
from establishing residence at the sites. No short-term effects would be created if Alternative 2
is implemented, because there would be no disturbance of the soil to affect the workers or the
community. Long-term effectiveness would depend on the enforcement of land use restrictions,
the effectiveness of posted signs, and continued maintenance operations to repair existing
covers.

Alternative 3 (Limited Excavation, Disposal, and Containment) would meet all RAOs and
provides a barrier (cover) against direct contact of contaminants by human and ecological
receptors.  This alternative also restricts access to the areas by fencing or other barriers and
places land use restrictions while providing early detection of potential contaminant migration
although this is not expected. The short-term effects would be limited to disturbance of the soil
and potential effects to  the construction workers but not the community. Proper engineering
controls along with personal  protective equipment will reduce exposure hazards to the workers.
Long-term effectiveness will depend on  land use restrictions and adherence to posted signs.
Long-term effectiveness would also depend on the continued maintenance of the cover. In
addition, long-term monitoring would provide  meaningful data to measure this alternative's
overall effectiveness.

Alternative 4 (Complete Excavation and Off-site Disposal) would meet all RAOs. The off-site
(away from NRF) disposal area would provide a barrier (cover) against direct contact of
contaminants by human and ecological  receptors. The short-term effects would be limited to
disturbance of the soil and potential effects to the construction workers but not the community.
Proper engineering controls along with personal protective equipment will reduce exposure
hazards to the workers. There will be no long-term consequences at the excavation sites
because all contaminants would be removed, but long-term effectiveness at the off-site disposal
area will depend on the enforcement of institutional controls and continued maintenance of the
cover at the off-site disposal area.

Alternatives 3 and 4 equally satisfy the criteria of overall  protection of human health and the
environment. These alternatives cover the contaminants preventing direct contact with the soil,
restrict future land use, minimize infiltration, and provide an early indication of contaminant
migration although migration is not expected. Although Alternative 2 meets the general criteria
of overall protection of human health, it does  not prevent direct contact of contaminated soil by
ecological receptors. It also does not prevent erosion or intrusion by plant species unless
additional care is given to repair erosion conditions and prevent plants from establishing
residence at the sites.


                                           64

-------
6.2    Compliance with ARARs

Alternative 1 (No Action) would not meet DOE orders regarding protection of current or future
receptors.  Because Alternative 1 and Alternative 2 (Limited Action) do not provide containment
of contaminants, they may not meet applicable rules regarding fugitive dust or control of air
pollution, although there is no evidence that specific regulatory levels would be violated. No
specific action would be taken to control fugitive dust or air pollution, which is possible for
surface soil contaminated areas; however, sampling and institutional controls for Alternative 2
would monitor the media of concern and prevent access to the sites of concern. Alternatives 3
and 4 would meet all ARARS  and To-Be-Considered criteria provided  proper engineering
controls for dust suppression and emissions control are followed during excavation.  If RCRA
characteristic waste is encountered, which is not expected, those ARARs associated with RCRA
requirements would be met.

6.3    Long-term Effectiveness and Permanence

The No Action alternative does not prevent future occupants from coming into direct contact
with the contaminated soil or prevent exposure to contaminated soil through erosion by wind or
water.  This alternative does not maintain long-term effectiveness or permanence.

Limited Action (Alternative 2) would prevent future occupants from coming into direct contact
with contaminated soils by establishing fencing or other barriers and by land use restrictions, but
does not prevent exposure to  contaminated soil through erosion by wind or precipitation.  The
long-term effectiveness depends on the ability to enforce the land use restrictions and maintain
existing covers. Long-term monitoring of groundwater and soil would provide early warning of
potential contaminant migration, although this is not expected.

Limited Excavation, Disposal,  and Containment (Alternative 3) consolidates most of the soil at
NRF-14. An engineered earthen cover would be placed over NRF-14  and the adjacent area,
NRF-12B.  Another cover would be placed over NRF-19. This alternative would prevent the
dispersion of contaminants through erosion by wind or precipitation and direct exposure by
contact, and would limit infiltration from precipitation. The long-term effectiveness of this
alternative depends on the durability of the designed cover and effectiveness of the engineered
layers. Long-term effectiveness would also be achieved by using institutional controls,
maintenance, and monitoring. Institutional controls (land use restrictions and fencing or other
barriers) would be used to restrict residential development of this land, which could breach the
covers and expose the contaminated materials. In addition, long-term maintenance, including
inspections and cover repairs, would prevent a breach of the cover.  Long-term monitoring of
the groundwater and soil would be initiated to provide early warning of contaminant migration.
although this is not expected.

Complete Excavation and Off-site Disposal (Alternative 4) removes contaminated soil from NRF
and transports the soil to a proposed INEEL soil repository or similar licensed facility. Since the
contaminants are removed from NRF, long-term effectiveness is achieved at the removal areas.
The residual risk remaining at NRF would result from soil containing contaminants below the
cleanup levels, which were established based on risk-based concentrations.  Long-term
effectiveness at the off-site (away from NRF) disposal area would depend on the institutional
controls, maintenance,  and monitoring performed at the off-site disposal area. Alternative 4
provides the best long-term effectiveness and permanence of all the alternatives because it
removes the contaminant source.
                                          65

-------
6.4    Short-term Effectiveness

Alternative 1 does not perform a remedial action and therefore there is no increased short-term
risk for this alternative. The short-term risks associated with Alternative 2 would be minimal
since contaminants are not disturbed. Construction activities, such as building fences, would
increase direct exposure to radionuclides, but this would be small compared to excavating
activities.

Alternatives 3 and 4 would not pose an increased risk to the community because the remedial
actions would occur at a remote location from the community. Alternative 4 wontd likely involve
the transportation of soil along highways within the INEEL boundary, but this would still be
isolated from public highways. Protecting site personnel from potential hazards arising from
construction activities would be a concern under both alternatives. The primary concerns would
be radiation exposure to the workers and the inhalation or ingestion of contaminants caused by
the disturbance of soil. These risks would be mitigated by the use of appropriate personnel
protective equipment or other engineered  controls used during the construction.  Preplanning
work evolutions would also minimize the time exposed to radionuclides.

Some impacts to the environment during excavation and capping activities for Alternatives 3
and 4 would be unavoidable during construction. Overall, construction activities represent a
controllable risk and would not present a significant negative impact to site flora and fauna in the
vicinity of the excavation or cover construction.  There are no known rare or endangered plants
or animals in the vicinity of the excavation or cover areas. The area around NRF has been
surveyed and some areas of archeological or historical value were found and identified as
culturally sensitive. The excavation areas do not occur in these identified areas and, therefore,
these known cultural areas would be excluded from remedial action activities. Although
unlikely, the potential exists that unknown  culturally sensitive areas could be disturbed during
construction activities.

Since Alternative 3 excavates and handles less radioactive soil, it has better short-term
effectiveness than Alternative 4, which requires much more soil to be excavated, packaged, and
transported. Alternative 2 has the best short-term effectiveness, since only minimal time is
spent at the sites of concern.

6.5    Reduction of Toxicity, Mobility, and Volume through Treatment

Treatment technologies were determined not to be practicable because they were ineffective,
difficult to implement, and/or very costly. None of the alternatives use treatment as a remedial
action and, therefore, do not reduce toxicity, mobility, or volume through treatment. Alternatives
3 and 4 do reduce mobility through containment.

6.6    Implementability

Each  alternative is considered implementable. The remedial technologies of excavating, cover
construction, land use restrictions, fencing, and monitoring have a proven reliability.  The
technologies associated with the alternatives are readily available, relatively simple, and easily
constructed and maintained.   The necessary equipment and specialized personnel would be
available for any of the alternatives.  The excavation, covering, and monitoring activities
associated with Alternatives 3 and 4 can be conducted using common construction techniques.
Alternatives 3 and 4 would have some limited impact on current site operations, increasing the
difficulty  in implementing the actions. These impacts include limiting access to portions of NRF
during excavation and construction activities, the disruption of the NRF security fence, and
modification of traffic patterns to implement the remedial actions.  None of the actions would be
expected to impact future operations. Alternative 2 would be the easiest to implement since

                                          66

-------
only minimal construction activities involving a small number of personnel and equipment would
be necessary.  Alternative 2 would have little impact on present site operations, but may have
the greatest impact on future site operations, since various areas would be fenced off to prevent
access. Alternative 4 would be the most difficult to implement because of the uncertainty in the
availability of the various off-site (away from NRF) disposal options. Additional concerns with
Alternative 4 include packaging and transportation to the disposal site.

6.7    Cost

Alternative 1 (No Action) would not entail any additional costs. The costs assoeiated with
Alternatives 2 and 3 include 30 years of monitoring. Most of the 30 year monitoring cost
(approximately $2.8 million) is attributed to groundwater monitoring that is presently part of the
Groundwater Monitoring Program at the NRF.  This program was established in the ROD for
OUs 8-05 and 8-06, Landfill Areas, and the identified cost does not necessarily represent an
increased cost. .

Alternative 2 would not require any excavation work.  Alternative 3 would excavate an estimated
total volume of 133,000 cubic feet of soil compared to 1,171,000 cubic feet for Alternative 4.
Alternative 3 would excavate an estimated 58,000 cubic feet of contaminated soil compared to
447,000 cubic feet for Alternative 4. Each alternative would remove approximately 3,130 linear
feet of pipe.

Alternative 4 represents the highest cost.  Although Alternative 4 does not require long-term
monitoring, significantly more contaminated soil (over seven times more) would be excavated in
Alternative 4 than Alternative 3. Additional packaging and transportation of the soil would be
required. These activities and the associated radiological controls represent the primary cost
increase of Alternative 4 over Alternative 3. In addition, if disposal occurred away from NRF,
disposal fees including overhead costs may be charged to NRF. Table 9 provides a summary
of the costs in Net Present Value (in 1997 dollars) associated with  each of the alternatives.

6.8    State Acceptance

The IDHW has been involved in the development and review of the NRF Comprehensive RI/FS,
the Proposed Plan, and this ROD.  All comments received from IDHW on these documents
have been resolved and incorporated into these documents accordingly. In addition,  IDHW has
participated in public meetings where public comments and concerns have been received and
responses offered.

The IDHW concurs with the selected remedial alternative for the sites contained in this ROD
and is signatory to the ROD with DOE and EPA.

6.9    Community Acceptance

Community participation in  the remedy selection process included participation in the public
meetings held in January 1998 and review of the Proposed Plan during the public comment
period of January 12 through March 12, 1998. Community acceptance is summarized in
Section 7 and the Responsiveness Summary presented in Part III of this document. The
Responsiveness  Summary includes comments received either orally or in writing from the
public, and the agencies' responses to these comments.
                                          67

-------
                         Table 9. Cost Summary for Each Alternative

OU 8-08 Alternative 2 Limited Action, Monitoring Cost Estimate

       Cost Elements
         Estimated Costs
RD/RA Management and Documentation Costs

      Overall Westinghouse Project Management'3'
      RA Construction Project Management (contractor)
Construction Costs

      Access Restriction Fencing

      Contractor General Conditions
      (Includes Mobilization & Demobilization Costs)

      Contractor Overhead and Profit
Operations and Maintenance Costs

       Oversite Management
       Operation & Maintenance(b)
             $    285,191
             $      5,468

Subtotal     $    290,659
             $     47,099

             $     39,016


             $      9,660

Subtotal     $     95,775
             $    436,709
             $  2,127,480
                                                                 Subtotal
             $  2,564,189
Net Present Value Cost (in 1997 dollars)
             $  2,950,623
(a) - RA Project Management and Oversight, Remedial Action Documents Preparation.

(b) - Includes 30 year Monitoring Costs. (Annual Net Present Value cost of $72.500 in 1997 dollars)
                                            68

-------
OU 8-08 Alternative 3 Limited Removal Capping Cost Estimate
	Cost Elements	Estimated Costs
RD/RA Management and Documentation Costs

       Overall Westinghouse Project Management'31                                    $    572,325
       RA Construction Project Management (contractor)                                $    334,730

                                                                          Subtotal      $    907,055

Construction Costs

       Excavation                                                                       $    267,674
       Load and Haul                                                                   $     59,642
       Demolition, Pipes                                                                $     97,942
       Demolition. Catch Basins/Manholes                                              $     10,734
       Demolition, Buildings                                                             $     70,207
       Cap Construction                                                                $    551,604
       Sampling and Analysis                                                           $     60,920
       Access Restriction Fencing                                                      $    100,332
       Additional Costs Incurred during Work                                            $  2,075,530
       involving Radiological Controls''

       Contractor General Conditions'0'                                                  $    776,113

       Contractor Overhead and Profit                                                  $    441.437

                                                                          Subtotal      $  4,512,135

Operations and Maintenance Costs

       Oversite Management                                                            $  1,359,081
       Operation & Maintenance'"'                                                      $  2,127,480

                                                                          Subtotal      $  3,486,561


Net Present Value Cost (in 1997 dollars)                                              $  8,905,751


(a) - RA Project Management and Oversight, Remedial Design/Remedial Action Documents Preparation.
(b) - Work involving radiological controls includes excavation, demolition, loading and hauling, unloading and controlling soil in consolidation
area, and decontamination. Additional costs associated with work involving radiological controls include labor costs (due to lower labor
efficiency, additional manpower requirements, and additional training requirements), equipment costs (due to special or additional
equipment required, decontamination of equipment, loss of equipment), and material costs (personnel protective equipment, containment
materials, etc.).
(c) - Costs include mobilization and demobilization, subcontractor project management, various office equipment and personnel, safety
equipment and clothing, sales tax, per diem, insurance, temporary office structures, construction signs, photography, and equipment rental
This generally represents a percentage of construction task costs, which for this alternative is 24%.
(d) - Includes 30 year Monitoring Costs. (Annual Net Present Value cost of $72,500 in 1997 dollars)
                                                  69

-------
OU 8-08 Alternative 4 Removal/Offsite Disposal Cost Estimate 	

     Cost Elements	Estimated Costs
RD/RA Management and Documentation Costs

       Overall Westinghouse Project Management00                             $    1,848.997
       RA Construction Project Management (contractor)                        $      758,929

                                                                   Subtotal   _ $    2,607,926

Construction Costs

       Excavation                                                               $      890,778
       Landfill disposal fees(b>                                                   $    1,906,264
       Landfill waste preparation and transportation costs'0'                      $    5,718,791
       Demolition, Pipes                                                         $       98,138
       Demolition, Catch Basins/Manholes                                      $       10,755
       Demolition, Buildings                                                     $       70,348
       Sampling and Analysis                                                   $      163,392
       Additional Costs Incurred during Excavation                              $    3,301,286
       Work involving Radiological Controls

       Contractor General Conditions"1'                                          $    2,955,332

       Contractor Overhead and Profit                                           $    1,327.085

                                                                   Subtotal      $   16,442,169

Operations and Maintenance Costs

       Oversite Management                                                    $        4,037
       Operation & Maintenance                                                 $        7,799

                                                                   Subtotal      $       11,836
Net Present Value Cost (in 1997 dollars)                                       $   19,061,931



(a) - RA Project Management and Oversight, Remedial Design/Remedial Action Documents Preparation.

(b) - Assumed disposal fee of approximately $100 per cubic yard. This is based on site experience and is an anticipated average
cost associated with various disposal options away from NRF including an INEEL soil repository or off-INEEL commercial facility

(c) - The actual transportation costs are estimated to be small compared to the waste preparation, packaging, sampling, etc., costs.
This cost includes the additional costs associated with work involving radiological controls during preparation, packaging, sampling.
etc.  These additional costs include labor costs (due to lower efficiency, additional manpower requirements, and additional training
requirements), equipment costs (due to special or additional equipment required, decontamination of equipment, loss of equipment),
and  material costs (personnel protective equipment, containment materials, etc.).

(d) - Costs include mobilization and demobilization, subcontractor project management, various office equipment and personnel.
safety equipment and clothing,  sales tax, per diem, insurance, temporary office structures, construction signs, photography, and
equipment rental. This generally represents a percentage of construction task costs, which for this alternative is 24%.
                                               70

-------
6.10   Summary

The comparative analysis assesses the relative performance of the alternatives against the first
seven evaluation criteria.  Each alternative is evaluated individually against the threshold criteria
and the primary balancing criteria. The modifying criteria was not used for the comparative
analysis since the modifying criteria evaluates the state and public acceptance of the selected
remedial action alternative after the comparative analysis is made.  A comparative analysis
summary indicates a relative ranking for each alternative in order to aid in identifying the
recommended alternative. Alternative 1, which does not meet the threshold criteria of protection
of human health and the environment and may not meet the threshold criteria of compliance
with ARARs, and as such was eliminated from consideration. A comparison was not made for
reduction of toxicity, mobility, or volume through treatment since none of the alternatives
included treatment as an action.

Each of the alternatives, with the exception of the no action alternative, would meet the RAOs
associated with the protection of human health. Alternative 2, Limited Action, may not meet the
RAOs for protection of environmental receptors. The risk assessment given in the NRF
Comprehensive RI/FS showed that preventing access to and direct contact with the
contaminated soil would be protective of human health. Preventing access to the areas of
concern would place the receptor at a sufficient distance that external exposure to radionuclides
would not be a pathway of concern. These restrictions on access to the area would also
prevent soil ingestion and food crop ingestion associated with the contaminated soil.
Alternative 2 was determined that it may not meet the ARAR requirements associated with
controlling fugitive dust and air pollution, although there is no evidence that specific regulatory
levels would be violated. Alternatives 3 and 4 meet all RAOs and provide overall protection of
human health and the environment.  Both alternatives meet all ARARs established for each
alternative. Based on the criteria given in Section 6.0, Alternative 3 (Limited Excavation,
Disposal, and Containment) was ranked higher than Alternative 4 (Complete Excavation and
Off-site Disposal) because of more favorable comparative ratings due to lower costs, easier
implementation, and better short-term  effectiveness.  Based on the above information and
comparative analysis, Alternative 3 was the recommended selected remedial action for the sites
of concern.
                                          71

-------
7.0    Highlights of Community Participation

In accordance with CERCLA §113(k)(2)(B)(i-v) and §117, a series of opportunities for public
information and participation in the investigation and decision process for WAG 8 was provided
to the public from September 1995 through March 1998.  The opportunities to obtain information
and provide input included INEEL Reporter newsletter articles (a publication on the INEEL's
Environmental Restoration Program); Citizens' Guide supplemental updates; a proposed plan;
focus group interactions, which included teleconference calls, briefings, and presentations to
interest groups; and public meetings. In addition, several public involvement activities were
conducted during previous investigations including an RI/FS and two small removal actions.
The ROD for the Industrial Waste Ditch (OU 8-07) and Landfill Areas (OUs 8-05 and 8-06)
contains a summary of the public involvement activities that were associated with these former
investigations at NRF.

Regular reports concerning the status of the project were included in bimonthly  issues of the
INEEL Reporter and were mailed to those on the mailing list. Reports also appeared in two
issues  of a Citizen's Guide to environmental restoration at the INEEL in early 1996 and  1997
and one issue of Environmental Restoration Progress, A Status Report of Environmental
Cleanup at INEEL in February 1998. Both of these reports are supplements to the INEEL
Reporter.

On January 12, 1998, DOE issued a news release to more than 100 contacts concerning the
beginning of a 30-day public comment period pertaining to the NRF Comprehensive Proposed
Plan.  This comment period began on January 12, 1998.  In response to a request from the
public,  the comment period was extended 30 days and ended on  March  12,1998. Many of the
news releases resulted in a short note in community calendar sections of newspapers and
public service announcements on radio stations. The news release gave notice to the public
that NRF investigative documents would be available from the beginning of the comment period.
These documents were available in the Administrative Record section of the INEEL Information
Repositories located in the INEEL Technical Library in Idaho Falls and public libraries in Fort
Hall and Moscow.

The types  of public participation used in the decision-making process for the public included
receiving the proposed plan, receiving telephone calls, attending the availability sessions
one-half hour before public meetings to informally discuss the issues, and submitting oral and
written comments to the agencies during the 60-day public comment period.  At the request of
the Shoshone-Bannock Tribes, a briefing on the proposed plan was given to Tribal members
and their technical staff at Fort Hall in January 1998. A briefing of the proposed plan was also
given to a subcommittee of the Idaho National Engineering and Environmental Laboratory
Citizens Advisory Board in December 1997 and was followed up with a presentation to the
whole board in January 1998. The advisory board is made up of individuals representing the
citizens of Idaho who make recommendations to DOE, EPA,  and the State of Idaho regarding
environmental activities at the INEEL.

Copies of the proposed plan were mailed on January 6, 1998 to 700 members of the public on
the INEEL Community Relations mailing list and approximately 50 people not on the mailing list,
urging  citizens to comment on the proposed plan and to attend public meetings.  Display
advertisements announcing the availability of the proposed plan, the locations of public
meetings,  and comment period extensions appeared in six regional newspapers during the
weeks of January 11 and February 8 in Boise, Fort Hall, Idaho Falls, Moscow, Pocatello, and
Twin Falls. Large display advertisements appeared in the following newspapers: the Idaho
Statesman (Boise); the Sho-Ban News (Fort Hall); the Post Register (Idaho Falls); the Daily
News (Moscow); the Idaho State Journal (Pocatello); and the Times News (Twin Falls).


                                         72

-------
A series of three news releases and newspaper advertisements, including the notice of the
extension of the comment period, provided public notice of these public involvement activities.
Offerings for briefings and the 30-day public comment period (including the 30-day extension of
the comment period) that was to begin January 12 and end March 12, 1998 were also
announced. Personal telephone calls were made to stakeholders in Idaho Falls, Pocatello,
Boise, and Moscow areas the weeks of January 5 and  12 to remind individuals about the
meetings and to see if a briefing was desired.

Written comment forms (including a postage-paid business-reply form) were available to those
attending the public meetings.  The forms were used to submit written commente'either at the
meeting or by mail. The reverse side of the meeting agenda contained a form for the public to
use in evaluating  the effectiveness of the meetings. A court reporter was present at each
meeting to record discussions and public comments. The  meeting transcripts were placed in
the Administrative Record section for WAG 8, OU 8-08, in  three INEEL Information
Repositories. For those who could not attend the public meetings, but wanted to make formal
written comments, a postage-paid written comment form was attached to the proposed plan

Public meetings were held on January 20 in Boise, January 21 in Moscow, and January 22,
1998 in Idaho Falls.  Also on January 21, a briefing was given to a risk assessment class at the
University of Idaho. Approximately 80 people not associated with the project attended the
public meetings.  Overall, 12 citizens provided formal comments; of these, three citizens
provided oral comments, and 11 provided written comments (two citizens provided oral and
written comments). All comments received on the proposed plan were specifically considered
during the development of this ROD. The agencies appreciate the public's participation in this
process and acknowledge the value of public  comment. A Responsiveness Summary has been
prepared as part of the ROD.  The formal oral comments presented at the public meetings and
written comments are included in Part III of this ROD and in the Administrative Record for NRF
                                         73

-------
8.0    Selected Remedy

The results of the NRF Comprehensive RI/FS identified nine sites of concern where an
unacceptable or potentially unacceptable risk to human health exists. Those sites that contain
or potentially contain contaminants resulting in an increased cancer risk greater than 1 in 10,000
to a future 100-year resident or lead concentrations above suggested screening levels for
cleanup represent an unacceptable risk.  There are 55 other sites that have no risk or an
acceptable risk and do not require a remedial action.  Based on the consideration of the
requirements of CERCLA, the detailed analysis of alternatives, and public comments, DOE,
EPA, and IDHW have selected the alternatives as described in the following sections.

8.1    No Action/No Further Action Sites

Based on Track 1 and Track 2 investigations and the RI/FS evaluation, a No Action decision is
made by the agencies for those sites with no source present or a source present that represents
an acceptable risk for unrestricted use. This "No Action" decision means no future evaluations
or followups are required.

Based on the same information, a No Further Action decision is made by the agencies for those
sites with a source or potential source present, but for which an exposure route is not available
under current conditions. This "No Further Action" decision means that the site will be included
in a CERCLA review performed at least every five years to ensure that site conditions used to
evaluate the site have not changed and to verify the effectiveness of the No Further Action
decision. All monitoring data collected from the No Further Actions sites will be included in the
CERCLA five year review. Although no additional remedial action is required at this time,
present institutional controls, such as current fencing  and administrative controls on excavation,
will be maintained.  If site conditions change, including present institutional controls, additional
sampling, monitoring, or action will be considered.

The following sites are defined as No Action or No Further Action sites.

NO ACTION SITES:

Operable Unit 8-01

       NRF-03, ECF Gravel Pit
       NRF-06, Southeast Landfill
       NRF-08, North Landfill
       NRF-33, South Landfill
       NRF-40, Lagoon Construction Rubble
       NRF-41, East Rubble Area
       NRF-63, A1W Construction Debris Area

Operable Unit 8-02

       NRF-09, Parking Lot Runoff Leaching Trenches
       NRF-37, Old Painting Booth
       NRF-38, ECF French Drain
       NRF-47, Site Lead Shack (Building #614)
       NRF-52A, Old Lead Shack (Location #1)
       NRF-52B, Old Lead Shack (Location #2)
       NRF-54, Old Boilerhouse Slowdown Pit
       NRF-55, Miscellaneous NRF Sumps and French Drains

                                          74

-------
•     NRF-64, South Gravel Pit
•     NRF-68, Corrosion Are,a Behind BB11

Operable Unit 8-03

      NRF-10, Sand Blasting Slag Trench
      NRF-15, S1W Acid Spill Area
      NRF-18B, S1W Spray Pond #2 and A1W Cooling Tower
      NRF-20. A1W Acid Spill Area
      NRF-45, Site Incinerator
      NRF-56, Degreasing Facility

Operable Unit 8-04

      NRF-28, A1W Transformer Yard
      NRF-29, S5G Oily Waste Spill
      NRF-31, A1W Oily Waste Spill
      NRF-44, S1W Industrial Wastewater Spill Area
      NRF-58, S1W Old Fuel Oil Tank Spill
      NRF-62, ECF Acid Spill Area
      NRF-65, Southeast Corner Oil Spill
      NRF-69, Plant Service Underground Storage Tank (UST) Diesel Spill
      NRF-70, Boiler House Fuel Oil Release
      NRF-71. Plant Service UST Gasoline Spill
      NRF-72, NRF Waste Oil Tank
      NRF-73, NRF Plant Services Varnish Tank
      NRF-74, Abandoned UST's Between the NRF Security Fences
      NRF-75, Fuel Oil Revetment Oil Releases
      NRF-76, Vehicle Barrier Removal
      NRF-77, A1W Fuel Oil Revetment Oil Releases

Operable Unit 8-08

•     NRF-13, S1W Temporary Leaching Pit
•     NRF-32, S5G Basin Sludge Disposal Bed
•     NRF-79, ECF Water Pit Release

Operable Unit 8-09

•     Interior Industrial Waste Ditch

NO FURTHER ACTION SITES:

Operable Unit 8-02

•     NRF-42, Old Sewage Effluent Ponds
•     NRF-61, Old Radioactive Materials Storage and Laydown Area

Operable Unit 8-03

•     NRF-18A, S1W Spray Pond #1
•     NRF-22, A1W Painting Locker French Drain
                                       75

-------
Operable Unit 8-08

       NRF-02, Old Ditch Surge Pond
       NRF-16, Radiography Building Collection Tanks
       NRF-23, Sewage Lagoons
       NRF-43, Seepage Basin Pumpout Area
       NRF-66, Hot Storage Pit
       NRF-81, A1W Processing Building Area Soil

No Operable Unit (new sites identified after RI/FS)

•      NRF-82, Evaporator Bottoms Tank Release
•      NRF-83, ECF Hot Cells Release Area

8.2    Selected Remedy for Sites of Concern

The following sites were determined by the NRF Comprehensive RI/FS to be sites of concern:

       NRF-11, S1W Tile Drainfield and L-shaped Sump
       NRF-12A, Underground Piping to Leaching Pit
       NRF-12B, S1W Leaching Pit
       NRF-14, S1W Leaching Beds
       NRF-17, S1W Retention Basins
       NRF-19, A1W Leaching Bed
       NRF-21A, Old Sewage Basin
       NRF-21B, Sludge Drying Bed
       NRF-80 A1W/S1W Radioactive Line Near BB19

The Limited Excavation, Disposal, and Containment alternative (Alternative 3) is selected for the
nine sites of concern. Alternative 3 best satisfies the nine evaluation criteria. The Limited
Action alternative (Alternative 2) may not be protective of ecological receptors and would have a
potential impact on future site operations by eliminating access to various portions of NRF.
Alternative 3 was evaluated to be equally protective of human health and the environment as
the Complete Excavation and Off-site Disposal alternative (Alternative 4). Alternative 3 will
comply with all ARARs.  In addition, Alternative 3 has greater short-term effectiveness, is easier
to  implement, and costs less than Alternative 4.  Alternative 3 was also supported by the State
of  Idaho and generally had community acceptance. The major components of the selected
remedy for the nine sites of concern include:

•      Excavating contaminated soil above remediation goals and debris from six of the nine
       sites;
•      Consolidating the excavated soil at one site (S1W Leaching Beds);
•      Disposing of radiological, non-hazardous debris to an INEEL disposal facility or an
       appropriate off-site (away from INEEL) disposal facility and, if necessary, disposing of
       radiological, hazardous debris as a mixed waste per the INEEL Site Treatment Plan;
•      Constructing engineered covers primarily of native earthen materials in two areas that
       would cover the three sites not excavated, which includes the site where soil was
       consolidated.  Cover materials will be determined in the Remedial Design/Remedial
       Action Work Plan;
•      Radiation surveys and soil sampling during excavation;
•      Soil and groundwater sampling to monitor any potential releases from the covered
       areas;
                                         76

-------
•      Periodic inspection and maintenance of covers to ensure their integrity;
•      Establishing fencing or other barriers and land use restrictions.

Soil above 16.7 pCi/g of cesium-137 and 45.6 pCi/g of strontium-90 will be removed from sites
NRF-11, NRF-12A, NRF-17, NRF-21A, NRF-21B, and NRF-80, if present. Lead was detected
above remediation goals in only one sample in a location where a cover will be placed. As
explained in Section 5.1, remediating the soil to  below remediation goals for cesium-137 and
strontium-90 will also reduce the risks associated with other radiological contaminants of
concern. NRF-11, NRF-12A, NRF-17, NRF-21A, NRF-21B, and NRF-80 contain underground
piping or concrete structures that are planned for removal during decontamination and
dispositioning activities at NRF.  Disposal of pipe and concrete debris will be through current
decontamination and dispositioning practices and will likely be sent to the RWMC located at the
INEEL.  Sampling concurrent with excavation activities will ensure all soil above remediation
goals is removed.  After the soil is excavated, it will be placed in NRF-14 (S1W Leaching Beds).
The estimated contaminated soil volume from all the proposed excavation areas will fit into the
present leaching beds. A single engineered earthen cover will cover NRF-14 and the adjacent
NRF-12B (S1W Leaching Pit). Another cover will be placed over site NRF-19 (A1W Leaching
Bed). The cover design will be determined during the remedial design phase, but will likely
include soil,  gravel cobble, and/or rip-rap to ensure proper containment of contaminants.
Performance goals established for the proposed cover were given in Section 5.2.3.

This alternative includes operation and maintenance costs for long-term maintenance and
monitoring of the covers.  Institutional controls including fencing or other barriers and land use
restrictions will be implemented to prevent access to the covered areas. A description of the
areas where access will be restricted, the specific controls (e.g., fences, signs) that will be used
to ensure that access will  be restricted, the types of activities that will be prohibited in certain
areas (e.g., excavation), and the anticipated duration of such controls will  be determined during
the remedial design phase and will be incorporated into the SDP.  This information will be
submitted to the EPA and IDHW once it has been placed in the SDP.  As appropriate, NRF shall
also provide the Bureau of Land Management or other Federal agencies the detailed description
of the controls identified above. Long-term monitoring of NRF groundwater via the present
groundwater well network and monitoring of soil around the covered areas will be performed. A
review will be conducted at least every five years as required by CERCLA to verify the
effectiveness of the selected remedy.  Contingency actions would include off-site (away from
NRF) disposal of soil that  exceeds the capacity of NRF-14 or continued consolidation at NRF-14
above surface level, although these are unlikely to be necessary.  The remedial actions will be
performed in accordance with all ARARs. See Section 5.2.3 for a more detailed discussion  of
Alternative 3.
                                          77

-------
9.0    Statutory Determination

The selected remedies (including No Action and No Further Action decision sites) meet the
statutory requirements of CERCLA Section 121, the regulations contained in the NCR, and the
requirements of the FFA/CO for the INEEL All remedies meet the threshold criteria established
in the NCP (i.e., protection of human health and the environment and compliance with ARARs).
CERCLA also requires that the remedy uses permanent solutions and alternative treatment
technologies to the maximum extent practicable, and that the implemented action be cost
effective. Finally, the statute includes a preference for remedies that employ treatment that
permanently and significantly reduce the volume, toxicity, or mobility of hazardous wastes as
their principal element. The following sections discuss how the selected remedy addresses
these statutory requirements.

9.1     Protection of Human Health and the Environment

As described in Section 8, the selected remedy for the sites of concern satisfies the criterion of
overall protection of human health and the environment.

9.1.1   No Action/No Further Action Sites

For the 55 No Action and No Further Action sites covered by this ROD, no remedial action is
necessary to ensure continued protection of human health and the environment. The 55 sites
are identified in Section 8. The 43 No Action sites have no risk or an acceptable risk to  human
health and the environment were they to be released for unrestricted use, and therefore No
Action is justified. The 12 No Further Action sites contain sources or potential sources that may
pose unacceptable risks to human health and the environment, but an exposure pathway is not
available, thus providing overall protection of human health and the environment.  Because a
source may still be present at the 12 No Further Action sites, a review will be performed every
five years to ensure the No Further Action decision remains protective of human health and the
environment.

9.1.2   Limited Excavation, Disposal, and Containment

Limited Excavation, Disposal, and Containment is the selected remedy for the nine sites of
concern. This remedy satisfies the criterion of overall protection of human health and the
environment by preventing direct contact with the contaminated soils by all  potential receptors,
reducing radiation external exposure through shielding by the cover, and reducing the likelihood
of biointrusion.

9.2    Compliance with ARARs

The Limited  Excavation, Disposal, and Containment remedy for the nine sites of concern will
meet all federal and state ARARs. The selected remedy will be designed to comply with all
action-specific, location-specific, and chemical-specific federal and state ARARs, as presented
in Table 10.

Applicable requirements are those cleanup standards, standards of control, and other
substantive environmental protection requirements, criteria, or limitations promulgated under
federal or state law which specifically address a hazardous substance, pollutant, contaminant,
remedial action, location, or other circumstance at a CERCLA site. Relevant and appropriate
requirements are those same standards mentioned for applicable requirements, except while
not applicable at the CERCLA site, address problems or situations sufficiently similar to those
encountered at the site such that their use is well suited to the particular site.


                                          78

-------
Three types of ARARs exist:  location-specific, action-specific, and chemical-specific.  In
general, location-specific ARARs place restrictions on the concentration of hazardous
substances or the conduct of activities solely because they occur in special locations.  Action-
specific ARARs are usually technology or activity based requirements or limitations on actions
or conditions involving specific substances. Chemical-specific ARARs are health or risk-based
numerical values or methodologies that result in the establishment of numerical values. The
values establish the acceptable concentrations of chemicals or substances that may be found in
or discharged to the environment.

9.2.1   Location-specific ARARs                                       —-

The Idaho State Historical Society has identified the INEEL as containing properties potentially
eligible for the National Register of Historic Places (NRHP). Several structures at NRF are
eligible for the NRHP including NRF-17 (S1W Retention Basins) and, therefore, the National
Historic Preservation Act (NHPA) (16 USC 470)  is considered applicable for the remedial action
associated with NRF-17. A final designation under the NRHP would mean this site must be
accorded the same protection under the NHPA as a site listed under the Act. All applicable
requirements established under the NHPA will be followed for remedial actions associated with
NRF-17.  Administrative controls are in place at NRF to ensure the requirements are met.

9.2.2   Action-specific ARARs

The action-specific ARARs identified for the sites of concern are listed in Table 10. The Idaho
Fugitive Dust Emission (IDAPA 16.01.01.651) requirements are applicable due to the
disturbance of soil at these sites. Because of the potential of encountering hazardous wastes in
the debris that leaves the area of contamination  (AOC) during the remedial action activities (i.e.,
demolition and disposal), state regulations (with  reference to the specific sections in the federal
regulations) concerning hazardous waste identification (IDAPA 16.01.05.005) and determination
(IDAPA 16.01.05.006.01) are considered applicable. These requirements for hazardous waste
management become applicable for the debris generated during the remedial work activities
because the debris must be transported off the NRF site; therefore, the debris must be
characterized for the presence of hazardous constituents for proper disposal.  The land disposal
restrictions (IDAPA 16.01.05.011) will be applicable in the event that the debris leaving the AOC
is found to contain hazardous wastes.

Portions of the state regulation (IDAPA 16.01.05.008) with reference to the specific federal
regulations as listed in Table  10, pertaining to surveying, closure, and  post closure care
requirements for RCRA landfill sites are considered relevant and appropriate for the two
CERCLA sites identified to be capped with an engineered cover under the selected remedy,
Alternative 3.  Since the two sites to be capped were not fully characterized, there remains an
uncertainty concerning the types and quantity of wastes that may remain in place.  Therefore,
the specific regulatory sections pertaining to the  closure and post closure care requirements as
listed in Table 10 are considered relevant and appropriate. The specific regulatory section
pertaining to surveying requirements for identifying the exact locations and dimensions of the
boundaries for the capped areas with respect to  permanently surveyed benchmarks is also
considered relevant and appropriate. Although unlikely, in the case where contaminated debris
generated during the  remedial work activities could be transported off the INEEL to an EPA
approved disposal facility, the procedures for planning and implementing off-site (away from
INEEL) response actions (40 CFR 300.440) are  considered applicable.
                                          79

-------
                      Table 10. ARAR and To-be-Considered List
Title
Citation
Relevancy
Location-Specific

National Historic Preservation
Act
16 USC 470
Applicable
Action-Specific
Standards for Owners and
Operators of Hazardous Waste
Treatment, Storage and
Disposal Facilities [Specific
Appropriate Federal Regulation
Sections:  Surveying, Closure
and Post Closure Care for
Landfills]

Identification and Listing of
Hazardous Waste (Specific
Applicable Federal Regulation)

Standards Applicable to
Generators of Hazardous   .
Waste (Specific Applicable
Federal Regulation Section:
Hazardous Waste
Determination)

Land Disposal Restrictions
(Specific Applicable Federal
Regulation Sections)

Procedures for Planning and
Implementing Off-site
Response Actions
IDAPA 16.01.05.008
[40 CFR 264.309(a), 40 CFR
264.310(a)(1)(2)(3)(4)(5) and 40
CFR 264.310(b)(1)(4)(5)(6)J
IDAPA 16.01.05.005
(40 CFR 261)


IDAPA 16.01.05.006.01
(40 CFR 262.11)
IDAPA 16.01.05.011
(40 CFR 268.7, .9, .40, .45, and
.48)

40 CFR 300.440
Idaho Fugitive Dust Emissions   IDAPA 16.01.01.651
Relevant & Appropriate
Applicable
Applicable
Applicable
Applicable
                                 Applicable
Chemical-Specific

National Emission Standards
for Hazardous Air Pollutants

Increments for Toxic Air
Pollutants

Idaho Groundwater Quality
Rule
40 CFR 61 92
IDAPA 16.01.01.585 &.586
IDAPA 16.01.11.200.01(a)
Applicable
Applicable
Relevant & Appropriate
                                        80

-------
 To-Be-Considered List
 Environmental Protection, Safety and Health Protection Standards   DOE Order 5480.4

 Low-level Radioactive Waste Management                       DOE Order 5820.2A

 Radiation Protection of the Public and Environment                DOE Order 5400.5

 Interim Soil Lead Guidance for CERCLA Sites and RCRA           EPA Guidance
 Corrective Action Facilities                                      Document"


9.2.3  Chemical-specific ARARs

The chemical-specific ARARs identified for the sites of concern are also listed in Table 10.
Because of the potential for the release of contaminants (radionuclides) into the air from the
remedial work activities involving soil movement and consolidation under the selected remedy,
the emission standard for radionuclide emissions to ambient air under the National Emissions
Standards for Hazardous Air Pollutants (40 CFR 61.92) are applicable. The State of Idaho's
increments for toxic air pollutants (IDAPA 16.01.01.585 and 586) are considered applicable
because of the potential for the release of some of the listed contaminants into the air duhng
excavation activities.  In addition, the Idaho Groundwater Quality Rule (IDAPA 16.01.11.200.01
(a)) is considered to be relevant and appropriate due to the  potential, although not likely, for the
migration of contaminants into the aquifer. The selected remedy provides for long term
monitoring of the aquifer beneath NRF. The Idaho Groundwater Quality Rule includes a wide
variety of constituents, including radiological constituents, with limits based on the protection of
human health.

9.2.4  To-be-Considered Guidance

Table 10 also lists other requirements, procedures, and guidance documents. The DOE Orders
stem from DOE'S policy for implementing legally applicable protection standards and to consider
and adopt, as appropriate, recommendations by authoritative organizations.  Since the identified
DOE Orders cover areas (i.e., low-level radioactive waste management, radiation protection)
that may be relevant for the selected remedy, these Orders  will be  considered and adopted as
appropriate. Since lead has been detected at one of the sites of concern, the EPA guidance
document will be useful in providing guidance  for the selected remedy.

9.3    Cost Effectiveness

The selected remedial action (Limited Excavation,  Disposal, and Containment) for the nine sites
of concern is cost effective because it is protective of human health and the environment,
achieves ARARs, and the costs are proportional to the effectiveness in meeting remedial  action
objectives.  Although the selected remedy costs more than a limited action remedy, it protects
ecological receptors, reduces the area footprint of soil requiring monitoring, and provides  more
efficient control measures (i.e.,  engineered cover) to prevent direct contact by receptors with
contaminated soils. The selected remedy costs significantly less than the excavation and off-
site (away from NRF) disposal option. Although the excavation and off-site disposal option
completely removes the source from NRF, costs for packaging, transportation, disposal fees,
and excavating over seven times more contaminated soil are considerably higher than the
selected  remedy. In addition, the short-term effectiveness for excavating and off-site disposal is
considerably less since a much larger amount of contaminated soil would be handled for a
longer period of time causing an increased risk for construction workers.

                                          81

-------
9.4    Utilization of Permanent Solutions and Alternative Treatment Technologies to the
       Maximum Extent Possible

The selected remedy will result in the permanent removal of contaminated soil from six of the
nine sites of concern. For the sites contaminated with radionuclides, effective treatment
technologies are currently unavailable; therefore, the preference for permanent solutions cannot
be met except through natural radioactive decay processes over time.  Treatment technologies
were determined not to be practicable because they were ineffective, difficult to implement,
and/or very costly. Since contaminated soils will remain on site, the selected remedy will not
result in a permanent solution for the three sites where contaminated soil will be covered with an
engineered cover. The selected remedy is a permanent solution for the six sites where
contaminants are permanently removed through soil excavation.

9.5    Preference for Treatment as a Principal Element

The statutory preference for remedies that employ treatment as a principal element will not be
met.  The treatment technologies considered during remedial action development were not
considered to be a technically or cost effective means for reducing risks to human health and
the environment. Natural radioactive decay will result in the reduction of contaminant
concentrations.
                                          82

-------
10.0   Documentation of Significant Changes

CERCLA Section 117(b) requires that an explanation of any significant changes from the
preferred alternative originally presented in the Proposed Plan be provided in the ROD. A few
changes have been made in the ROD that are different than presented in the Proposed Plan.
Although the changes may not be considered significant, they are included in this section of the
ROD to accurately reflect modifications made to the Proposed Plan.

Two new sites have been identified in this ROD. One of the two sites, NRF-82, was identified
as a CERCLA site immediately after issuing the Final Comprehensive RI/FS; a-description and
recommendation were included in the Proposed Plan. The other site, NRF-83, was identified as
a CERCLA site after the Proposed Plan and is included in this ROD.

NRF-83, ECF Hot Cells Release Area, is an area where cobalt-60 and cesium-137 were
discovered in the soil below a  concrete trench at ECF during a construction project. All
accessible contaminated soils adjacent to the trench were removed during the construction
project and replaced with clean soil. Contaminated soils below the trench were not removed to
preserve the integrity of the trench structure.  The trench was not removed and, therefore, an
exposure pathway to a potential receptor does not exist making the estimated risk low.  A
Track 1 investigation has been issued for the site and is available in the Administrative Record
for NRF.  The remaining risk at NRF-83 is estimated to be low because the presence of the
trench prevents exposure to remaining constituents.  Therefore, this site has been designated
as a No Further Action site. Because an exposure route does not exist for NRF-83, this site
would not impact the comprehensive assessment performed for NRF.

Site NRF-18, S1W Spray Ponds, was identified in the Proposed Plan as a single site. NRF-18
was proposed to be a No Further Action site because the concrete spray ponds would eliminate
any exposure pathway to contaminants below the basin.  In addition,  sampling data from around
the spray pond indicated an acceptable risk at the spray pond, but uncertainty existed in the
assessment because sample data below the spray ponds was not available.  Since the
issuance of the Proposed Plan, additional samples have been collected, analyzed, and
evaluated from the soil below and around Spray Pond #2 (north spray pond) in preparation for
demolition of Spray Pond #2.  The additional information for Spray Pond #2 allowed a more
detailed assessment of Spray  Pond #2.  Therefore, NRF-18 was split into two sites: NRF-18A
(S1W Spray Pond #1) and NRF-18B (S1W Spray Pond #2 and A1W Cooling Tower). NRF-18B
includes the A1W Cooling Tower, which, unlike the spray ponds, did not have a groundwater
concern because of leakage.  The risk at the A1W Cooling Tower through surface pathways
was estimated to be low based on a Track 1 risk evaluation. The A1W Cooling Tower was
demolished in 1995. NRF-18A includes portions of the fire protection system that was
connected to the spray ponds  and cooling tower and was suspected to have leaked on
occasion.

Samples were collected from several boreholes drilled through and around Spray Pond #2.
Sample data showed only slightly elevated levels of chromium, which was the primary
contaminant  of concern at Spray Pond #2. No elevated amounts of radionuclides were
detected. An updated assessment was issued for NRF-18B showing a low estimated risk
associated with Spray Pond #2 and the A1W Cooling Tower, with much less uncertainty than
the original assessment.  The  updated assessment indicates NRF-18B is a No Action site
instead of a No Further Action site as stated for all the original NRF-18 in the Proposed Plan.
NRF-18A will remain a No Further Action site until additional data are available to more
accurately assess it. The new data collected for Spray  Pond #2 shows the cumulative risk
assessment to be more conservative than originally indicated since actual contaminant
concentrations were less than concentration terms used in the cumulative risk assessment.


                                         83

-------
The Proposed Plan indicated that there were nine sites of concern and 62 other identified
release or potential release sites at NRF, for a total of 71 sites. Fifty-two of the 62 sites were
proposed as No Action or No Further Action sites and the other ten sites were associated with a
previous ROD, thus requiring no recommendation in the Proposed Plan. The current ROD (this
document) identifies all 87 sites at NRF, to more completely show the comprehensive nature of
the NRF Comprehensive RI/FS. The 71 sites identified in the Proposed Plan did not include the
13 No Action COCA sites, the new site (NRF-83) discussed above, or the splitting of sites
NRF-18 and NRF-52.  NRF-52 was evaluated as NRF-52A and 52B during past Track 1
investigations, but the Proposed Plan failed to identify NRF-52 as two separate sites. Hence,
71 sites (Proposed Plan) plus 13 sites (COCA) plus a new site (NRF-83) plus two-addition a I
sites (splitting NRF-18 and NRF-52 into two sites each) equals 87 total sites.

The 13 COCA sites were included in the comprehensive assessment of NRF, but were initially
screened out because they lacked a  source. The Proposed Plan shows 41 No Action sites and
11 No Further Action sites (52 total).  The ROD revises these to 43 No Action sites (includes
NRF-18B and both NRF-52 sites) and 12 No Further Action sites (includes NRF-83), for a total
of 55.

The Proposed Plan indicated that 316,470 cubic feet of contaminated soil would be excavated
under Alternative 4. The actual estimate of soil to be excavated is  now 1,170,890 cubic feet, of
which 446,550 cubic feet would be contaminated soil. The volume given in the Proposed Plan
failed to include additional contaminated soil (130,080 cubic feet) to be excavated near the S1W
Leaching Beds (NRF-14) and S1W Leaching Pit (NRF-12B). Although the volume was not
correct in the discussion of Alternative 4, the cost estimate provided in the Proposed Plan was
based upon the correct volume of soil.
                                         84

-------
                                     PART III
                        RESPONSIVENESS SUMMARY
                         A Summary of Comments Received
                          During the Public Comment Period
OVERVIEW
The Naval Reactors Facility (NRF) constitutes Waste Area Group (WAG) 8 at the Idaho National
Engineering and Environmental Laboratory (INEEL).  There have been 87 release or potential
release sites and nine operable units (OU) identified at NRF.  OU 8-08 was the last OU to be
investigated and represents the NRF Comprehensive Remedial Investigation/Feasibility Study
(RI/FS) including 18 sites not previously assessed. Twenty-three of the 87 sites were included
in previous decision documents. Selected remedies were chosen for the remaining 64 sites in
this Record of Decision (ROD). Nine of the 64 sites have been identified as sites of concern
that pose or potentially pose unacceptable risks to human health and the environment.  The
other 55 sites were determined to pose no risk or an acceptable risk to human health or the
environment and were identified by the agencies to require no additional action. For the nine
sites of concern, remedial action alternatives were evaluated, and a preferred alternative was
selected. A Proposed Plan that summarized the results of the NRF Comprehensive RI/FS and
presented the preferred remedial alternative was released by the agencies for public review on
January 6, 1998. Public comment on this document started on January 12, 1998, and was
extended until March 12, 1998 due to a request from  the public.  Public meetings were held in
Boise, Moscow, and Idaho Falls, Idaho, on January 20, 21, and 22, 1998, respectively.

This Responsiveness Summary responds to both written and oral comments received during
the public comment period and meetings. Generally, support for the preferred alternative was
favorable with concerns from commentors over the mobility of contaminants and the
construction design of the proposed covers.

BACKGROUND ON  COMMUNITY INVOLVEMENT

In accordance with the Comprehensive Environmental Response, Compensation, and Liability
Act (CERCLA) §113(k)(2)(B)(i-v) and §117, a series of opportunities for public information and
participation in the investigation and decision process for WAG 8 was provided to the public
from September 1995 through March 1998.  The opportunities to obtain  information and provide
input included INEEL Reporter newsletter articles (a publication on the INEEL's Environmental
Restoration Program), Citizens' Guide supplemental updates, a proposed plan, focus group
interactions, which included teleconference calls, briefings and presentations to interest groups,
and public meetings.

Regular reports concerning the status of the project were included in bimonthly issues of the
INEEL  Reporter and were mailed to those on the mailing list.  Reports also appeared in two
issues of the Citizen's Guide to environmental restoration at the INEEL in early 1996 and 1997
and one issue of Progress a Status Report of Environmental Cleanup at INEEL in February
1998. Both of these reports are supplements to the INEEL Reporter.

On January 12, 1998, U.S. Department of Energy (DOE) issued a news  release to more than
100 contacts concerning the beginning of a 30-day public comment period pertaining to the NRF
Proposed Plan.  This comment period began on January 12, 1998.  In response to a request

                                        85

-------
from the public, the comment period was extended 30 days and ended on March 12. 1998. The
news release gave notice to the public that NRF investigative documents would be available
from the beginning of the comment period. These documents were available in the
Administrative Record section of the INEEL Information Repositories located in the INEEL
Technical Library in Idaho Falls and public libraries in Fort Hall and Moscow.

Copies of the proposed plan were mailed on January 6, 1998 to 700 members of the public on
the INEEL Community Relations mailing list, urging citizens to comment on the proposed plan
and to attend public meetings. Public meetings were held at Boise, Moscow, and Idaho Falls,
on January 20, 21, and 22,  1998, respectively. Written comment forms were available at the
meetings, and a court reporter was present at each meeting to record transcripts of discussions
and public comments. A total of about 80 people not associated with the project attended the
public meetings.  Overall, 12 citizens provided formal comments; of these, three citizens
provided oral comments and 11 provided written comments (two citizens provided oral and
written comments). Comments were also received from the INEEL Citizens Advisory Board and
are included in this Responsiveness Summary.

This Responsiveness Summary has been prepared as a part of the ROD.  The ROD presents
the preferred alternative for the nine sites of concern and the recommendation of No Action or
No Further Action for 55 other sites. The preferred alternative was selected in  accordance with
CERCLA, as amended by the Superfund Amendments and Reauthorization Act, and to the
extent practicable, the National Oil and Hazardous Substances Pollution Contingency Plan (the
National Contingency Plan). The decisions presented in the ROD are based on information
contained in the Administrative Record.  All formal oral comments, as given at the public
meetings, and all written comments, as submitted, are included in the Administrative Record for
the ROD.

LISTING OF COMMENTORS, COMMENT NUMBERS, AND PAGE NUMBERS

All of the formal comments submitted by the public in either written or oral form were tabulated
and assigned a comment number.  Where applicable, the commentors are listed alphabetically
in the first column; the affiliation of the commentor is given  in the second column (if no known
affiliation, identified as "concerned  citizen"); the comment number appears in the third column;
and the page the comment and response begins can be found in the last column.
                                         86

-------
NAME
Beatrice Brailsford
Beatrice Brailsford
Beatrice Brailsford
Chuck Broscious
Chuck Broscious
Chuck Broscious
Chuck Broscious
Chuck Broscious
Chuck Broscious
Chuck Broscious
Chuck Broscious
Chuck Broscious
Chuck Broscious
Chuck Broscious
Chuck Broscious
Chuck Broscious
Chuck Broscious
Chuck Broscious
Chuck Broscious
Chuck Broscious
Charles B. Greer
Walt Hampton
Martin Huebner
KayLin Loveland
KayLin Loveland
KayLin Loveland
KayLin Loveland
KayLin Loveland
Swen Magnuson
Swen Magnuson
Joe Merted
Charles M. Rice
Charles M. Rice
Buck Sisson
Buck Sisson
Buck Sisson
Buck Sisson
Buck Sisson
Dianne Thompson
Thomas D. Van Liew
Thomas D. Van Liew
Unknown
AFFILIATION
Snake River Alliance
Snake River Alliance
Snake River Alliance
Environmental Defense Institute
Environmental Defense Institute
Environmental Defense Institute
Environmental Defense Institute
Environmental Defense Institute
Environmental Defense Institute
Environmental Defense Institute
Environmental Defense Institute
Environmental Defense Institute
Environmental Defense Institute
Environmental Defense Institute
Environmental Defense Institute
Environmental Defense Institute
Environmental Defense Institute
Environmental Defense Institute
Environmental Defense Institute
Environmental Defense Institute
concerned citizen
concerned citizen
Coalition 21
Envirocare of Utah, INC.
Envirocare of Utah, INC.
Envirocare of Utah, INC.
Envirocare of Utah, INC.
Envirocare of Utah, INC.
concerned citizen
concerned citizen
concerned citizen
Citizens Advisory Board
Citizens Advisory Board
concerned citizen
concerned citizen
concerned citizen
concerned citizen
concerned citizen
concerned citizen
concerned citizen
concerned citizen
concerned citizen
COMMENT #
27
28
29
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
1
25
36
31
32
33
34
35
23
24
42
39
40
2
3
4
5
41
30
37
38
26
PAGE*
103
104
104
90
91
91
92
92
93
93
94
95
95
96
97
98
98
99
99
100
88
102
106
105
105
105
106
106
101
102
109
107
108
88
89
90
90
T08
104
107
107
102
87

-------
SUMMARY OF COMMENTS WITH RESPONSES

Comments presented during the public comment period on the Proposed Plan for the NRF
Comprehensive RI/FS are given below.  The public meetings were divided into a brief
presentation, an informal question-and-answer session, and a formal public comment session.
The meeting format was described in published announcements, and meeting attendees were
reminded of the format at the beginning of the meeting.  The informal question-and-answer
session was designed to  provide immediate responses to the public's questions and concerns.
Several questions were answered during the informal period of the public meetings on the
Proposed Plan. This Responsiveness Summary does not attempt to summarize.©/ respond to
issues and concerns raised during the informal part of the  public meetings.  However, the
Administrative  Record contains complete transcripts of these meetings, which include the
agencies' responses to these informal questions.

Comments received during the formal comment session of the meetings and written comments
received during the public comment period are addressed  by the agencies in this
Responsiveness Summary. The public was requested to provide their comments in writing,
orally during the public meetings, or by recording a message using INEEL's toll-free number.
The comments below are printed in their entirety and were not summarized.  The only edits
made were to correct minor spelling and editorial errors. In those cases where written
comments were received that were difficult to read, a best attempt to interpret the comment is
provided. Copies of the originally written comments are provided in the Administrative Record
file for NRF.

Comment 1

Agree that Alternative 3 is the best option.

Response: The agencies appreciate the time  and effort made to read and comment on the
Proposed Plan.

Comment 2

The proposed "Alternative 3:  Limited Excavation, Disposal, and Containment" for Waste Area
Group 8 - Naval Reactors Facility needs to be modified to better protect the groundwater,
reduce costs, and  reduce health risks to construction workers.  The contaminated soils should
be left in place  and capped with capillary barriers.  The capillary barrier will result in reduced
health risk, reduced costs, and improved groundwater protection. There is an ongoing effort at
the INEEL as well  as the  Hanford Area and Sandia National Laboratories to design capillary
barriers that greatly reduce the movement of water through buried waste and thereby minimize
contaminant transport. As a steward of the environment, the INEEL needs to minimize the
leaching and contaminant transport at all sites, within reasonable economic constraints.

Response: The riprap cover shown in the Proposed Plan for Alternative 3 was only a
preliminary design consideration and will be more fully evaluated during the remedial design
phase. To eliminate any  additional confusion about the cover design, the figure shown in the
Proposed Plan was eliminated from the ROD text.  The design  of the covers for Alternative 3 at
the consolidated areas will include an evaluation of contaminant migration and the value of
capillary barriers, although sampling performed during the NRF Comprehensive Remedial
Investigation (Rl) showed very little migration of contaminants of concern from the discharge
point (i.e.,  pipe, concrete basin).

Leaving the soil in place at all sites and constructing caps over each site was not considered a
feasible option. Some sites are below a concrete basin (NRF-17) or asphalt roadway (NRF-12A

                                          88

-------
and NRF-80).  Portions of three sites (NRF-11, NRF-12A, and NRF-21A) exist in the subsurface
between the NRF security fences, which makes covering in place not possible. In addition,
some of the sites involve underground piping. Covering the entire length of the pipe was not
considered feasible and could permanently disrupt the use of site areas.

Comment 3

The excavation and capping with riprap proposed under Alternative 3 is not a good alternative.
The excavation process is not a simple process in itself and the details are important.  Several
details that come to mind include: (1) The cleanup level is specified as a concentration for each
species in pCi/g, is the number a mean over the whole area? Or is it the maximum
concentration on the remaining solids? (2) During excavation and transport of the contaminated
soils how will spills and over filling of trucks be handled?  (3) What dust  suppression method will
be used? (4) Moving soil is a very dirty operation and even though dust is controllable there is
always dirt. The risk analysis presented in the Public Meetings/Briefings brochure dated
January 1998 is not complete.  I could not find any mention of the risk to construction workers
arising from physical activities.  This risk estimate needs to  include the physical risk as well as
the inhalation, ingestion, and physical contact exposure effects. Thus, the total risk of the
alternatives appears to not have been assessed. I realize this meeting was not put together to
deal with this level of detail, but the moving of contaminated soil at the INEEL will cost time and
cost money. Any  idea that does not require moving contaminated soils should be moved up the
list of preferred alternatives.

Response:

(1) The cleanup levels established in the Proposed Plan correspond to maximum allowable
values for each confirmatory sample. Any material above these values will be removed.

(2) The work will be engineered with detailed work, safety, and training procedures to minimize
the potential for spills and to prevent overfilling trucks during excavation work.  Many of these
procedures are currently in place and workers are continuously trained on proper radiological
controls, including spill response situations.

(3) The excavation of contaminated soil has been successfully performed during past remedial
work.  Also, NRF gained experience in dust suppression during the prior construction of three
landfill covers at NRF. Possible dust suppression techniques include keeping the soil wetted
during excavation activities, performing excavation in tented enclosures, halting excavation work
during windy conditions, and keeping man-made covers over contaminated soils. All these
techniques will be evaluated when planning the work addressed by this  ROD.

(4) The comparison of alternatives required a  qualitative evaluation of risk to workers and the
public during remedial activities. A quantitative, or numeric, risk assessment for the workers
performing the remedial actions is outside the scope of the NRF Comprehensive RI/FS.
Exposure limits are established that workers cannot exceed and exposure is monitored. Long
standing, proven Naval Nuclear Propulsion Program radiation and contamination controls will be
applied to this work.

Regarding physical (e.g., construction safety-related) work risk, NRF requires many safety
provisions in work procedures and requires following applicable Occupational Safety and Health
Act requirements. However, as stated above, a quantitative risk assessment in this regard is
outside the scope of the RI/FS. The quantitative risk assessments performed during the RI/FS
are intended to show the risks associated with a site in the absence of any  remedial action,
which in turn will provide the basis for determining whether or not a remedial action is necessary
and the justification for performing specific remedial actions. The chosen Alternative 3 appears
                                          89

-------
to minimize the movement of contaminated soils, which in turn will minimize physical work-
related risks.

Comment 4

Actual performance of the riprap for controlling biologic processes over time has not been
demonstrated.  The riprap covers in place on the INEEL do not appear to me to be effective in
control of small mammals. In fact riprap appears to be excellent habitat for pack rats, mice, and
rock chucks.  They provide high elevations for the rock chucks to sun themselves, the network
of large voids serve as ready made burrows, and as a whole appear to be excelTent protection
from predators. The riprap will trap snow and further increase infiltration of water. Also, the
riprap will reduce water losses from evaporation and evapotranspiration processes and thereby
increase the total volume of water available for the leaching of contaminants. The overall effect
of Alternative 3 will be to increase leaching rates and long term contaminant transport to the
Snake River Plain Aquifer. The fact that Alternative 3 may meet regulations of today is no
indication that the design will meet future regulations.  Future regulations will include  monitoring
above the aquifer, at which time the rapid infiltration and possibility of contaminant transport will
become front-page news.

Response:  The cover design shown in the Proposed Plan was only a preliminary design
consideration, and all comments received on the cover design will be considered during the
design evaluation.  It should be noted that migration of contaminants of concern to the aquifer is
not considered likely because the contaminants of concern tend to adsorb to site soils, and
because the low precipitation in this area provides only minimal driving head to move
contaminants deeper into soils. The  sites of concern were typically pond or leaching areas that
received large quantities effluent, yet sampling has shown that the contaminants of concern are
still primarily retained in the soil within a few feet from the discharge point. The entrapment of
future precipitation would not likely alter this condition.

Comment 5

One way to further reduce risk is to minimize the construction effort. Since the capillary barriers
can be constructed using gravels and soils that are close to the actual site the efforts of
construction and overall cost will be reduced. I recommend that the contaminated soils be left
undisturbed and that capillary barriers be added to the land surface, to control health risks
associated with removal, transport, and repositioning of contaminated soils.

I want the capillary barriers to be considered as an Alternative Action and see the comparison to
the alternatives presented in the Proposed Plan for Waste Area Group 8 - Naval Reactors
Facility.  I also want to see the risk to construction workers accounted for in the risk
assessments of the alternatives.

Response:  The agencies agree that minimizing construction efforts in general reduces short-
term risks.  That is one reason the limited excavation alternative (Alternative 3) was selected
over the complete excavation alternative (Alternative 4). However, as stated in the response to
Comment 2, several sites are located in areas where a cover is not practical. Capillary barriers
will be considered as part of the covers during the design phase. Health risks during
construction activities were discussed in Comment 3 above.

Comment 6

The Environmental Defense Institute (EDI) received the Department of Energy (DOE) proposed
plan (Plan) on Friday January 16th. Since Monday was a national holiday, it meant that EDI
received the Plan one working day prior to the public meeting in Moscow Wednesday

                                          90

-------
January 21.  The public meetings are the only opportunity an individual has to get oral testimony
into the public record. Inadequate preparation time literally translates into inadequate
opportunity to be engaged in the decision making process. Additionally, there are two
comprehensive waste area group plans presented, one for the Naval Reactors Facility and one
for Argonne National Laboratory - West, covering a total of over 28 individual waste release
sites. The volume of information needed to review two comprehensive plans is orders of
magnitude over one or two subgroup (operable unit) waste release sites. Therefore, the public
participation  process is fatally flawed and unacceptable.  EDI appreciates that the agencies
responded to our preliminary comments by extending the comment period.

Response: As stated in the comment, the public comment period was extended for 30 days to
allow additional time for public review and comment on the Proposed Plan.

Comment 7

The apparent absence of lessons learned between the Hanford Environmental Restoration (ER)
process and the INEEL ER process is regrettable and a serious threat to Idaho. DOE is taking
advantage of its position as the single largest employer in Idaho to float ER actions at INEEL
that it was not allowed to do at Hanford because public and regulatory pressure blocked
shortcuts. Specifically, at Hanford DOE was required to build the Environmental Restoration
Disposal Facility (ERDF) which is a fully compliant Resource Conservation Recovery Act
(RCRA)/Nuclear Regulatory Commission (NRC) mixed hazardous/radioactive dump with double
liner, leachate collection and monitoring wells and an impermeable cap.  ERDF was completed
in the Spring of 1996 at the farthest location on Hanford away from the Columbia River and will
receive contaminated soil and decontamination/decommissioning (D&D) waste. At INEEL, DOE
refuses to build such a repository because the Department is not being pressured by the state
and EPA regulators to comply with the law.

Response: Sampling performed at NRF has not shown any RCRA characteristic waste in the
soil.  If any RCRA characteristic waste is encountered while excavating, the applicable RCRA
regulations will be met.  Disposal will be accomplished per the applicable or relevant and
appropriate requirements (ARARs) given in the Record of Decision. NRF has always complied
with applicable regulations and will continue to do so in the future.

Comment 8

The Plan (January 1998 publication) assumes that the DOE  and the Naval Reactors  Facility
(NRF) enjoy credibility in the public's eye.  This is an invalid assumption.  These agencies  have
broken the law and are being forced  via a Federal Facility Agreement and Consent Order to
correct their illegal activities. As illegal polluters, no credibility can be assumed and therefore
full and complete disclosure is demanded in all Plan publications.  The Plan does not provide
the reader with full disclosure or provide the essential information the reader needs in order to
evaluate the appropriateness of the preferred remedial alternative. For instance, maximum
contaminate levels for all contaminates of concern must be stated for each Operational Unit as
well as the effective standard for that contaminate so that the reader can make up their own
mind whether the cleanup actions or no actions are appropriate. Stating conclusions without
providing definitive data to support the finding assumes credibility that the agencies do not have.

Response: Maximum soil concentrations detected at OU 8-08 during RI/FS or pre-RI/FS
sampling were provided in Table 2 of the Proposed Plan.  The Proposed  Plan is a summary of
the Comprehensive RI/FS performed at NRF. As stated in the plan, supporting documents are
available at Information Repositories at various locations  identified in the Plan.  The supporting
documents contain much more detailed information on the investigations performed at NRF,


                                         91

-------
including sample results.  As previously stated in the response to Comment 7, NRF has always
complied with applicable regulations and will continue to do so in the future.

Comment 9

Another major assumption that is extensively evoked in the Plan is 100 years of DOE monitoring
and institutional control of the contaminated sites.  In real life, when entities break the law, and
are required to do major corrective actions in the future, they are generally required to establish
a trust fund so that if they again decide to disregard their legal requirements, or are no longer in
existence, the funding will be there for the state or local government to do the joTT The state of
Idaho should therefore, require DOE to establish a monitoring/institutional control trust fund to
cover those costs at INEEL. An example of where this issue is important is the current
designation that NRF is not in the Big Lost River (one mile away) 100 year flood plain. This
current designation is due to Big Lost River dams that divert flood waters south into spreading
areas. These dams and their related water channels require regular maintenance in order to
provide that flood protection to NRF and other INEEL facilities. Spring 1997 runoff nearly
topped the dams.  Prior to construction of the diversion dam, NRF was in the Big Lost River 100
year flood plain(Ri/Fs@5j-  Nuclear Regulatory Commission (NRC) radioactive waste disposal
requirements state, "waste disposal shall not take place in a 100 year flood plain."[10CFR§6i5oj
Stipulated institutional control in the Record of Decision must include diversion dam and water
channel maintenance as well as an explicit monitoring regime and maintained fencing of waste
sites.  The NRF Plan proposes consolidation of contaminated soil into one of the leach pits.
The cesium alone will take over 420 years to decay to acceptable risk levels, or considerably
longer than the planned 100 year institutional control.  Indeed, institutional control must extend
as long as the contaminates are hazardous.

Response:  (1) Trust funds are not applicable to the Federal Government. (2) NRF is not
located on the 100-year flood plain (even in the absence of the dam), although parts of the
INEEL are on the flood plain. Nevertheless, the scenarios evaluated for the human health risk
assessment conservatively included flood-type conditions even though flood-type conditions are
very unlikely at NRF. (3) The monitoring and institutional controls are an integral part of the
selected remedial action.  CERCLA requires that a review be conducted every five years when
contaminants are left onsite  above risk-based levels to ensure the selected remedy remains
protective of human health and the environment. This continues after the 100-year period,
which refers to the earliest reasonable time that residential use could be envisioned for any
portion of the NRF site. The remedial action does not allow an entity to "walk away" from the
sites of concern.  Institutional controls are established such that fencing, border markers, and
legal land use restrictions will control access to the sites even if a DOE presence is no longer
established at the site. The design of the engineered cover will include a design criterion that
the integrity of the cover remains protective for as long as the radionuclides are present above
risk-based concentrations, which, based on the highest cesium-137 detected during remedial
investigation sampling (7,323 pCi/g), would be approximately 365 years.

Comment 10

The Environmental Protection Agency (EPA) and the Idaho Division of Environmental Quality
(DEQ) also incorrectly assume credibility with the public. The presence of their logos on the
Plan, their review of the document, and their endorsement of the preferred alternative make
these agencies complicitous in the Plan's inadequacies and flaws as well as a history of INEEL
"cleanup" Plans that were more coverup than cleanup.

Response:  EPA and DEQ have reviewed the Proposed Plan and have determined that it
adequately describes all essential elements of a Proposed Plan including site characteristics,
the nature and extent of contamination, site risks, remedial action objectives, description of
                                          92

-------
remedial alternatives, and comparative analysis of alternatives. The presence of the agencies'
logos on the Proposed Plan does not mean that the agencies have selected a remedy for NRF.
The agencies will consider public comments received on the Proposed Plan prior to selecting a
final remedy in the Record of Decision.

Comment 11

The Plan states: "The Comprehensive RI/FS Waste Area Group 8 represents the last extensive
Comprehensive Environmental Response, Compensation and Liability Act (CERCLA)
investigation for the Naval Reactors Facility." This Plan is not "comprehensiveu-because it
excludes the Retention Basin (one of the most contaminated waste sites at NRF) from the
CERCLA cleanup process. The Retention Basin (OU-8-08-17) is a large concrete tank that
temporarily holds liquid radioactive and chemical wastes (presumably to allow short-lived
isotopes to burn off) prior to discharge to the various leach pits. The Plan fails to state that the
sludge in the basin contains cesium-137 at 192,700 pico curies per gram (pCi/g)(risk-based
action level is 16.7 pCi/g) and Cobalt-60 at 20,410 pCi/g.(R|/Fs@H8.8] A long history of Basin leaks
assures significant soil contamination under the basin and therefore must be included in the
Comprehensive Plan.

Response: The retention basins were included in the Proposed Plan (e.g., see pages 9 and
10) with a remedial action that includes removing the concrete basins and cleaning up that soil
below the basins which contains  radioactivity above remediation goals.  The sludge in the basin
will be removed under decontamination and dispositioning activities at NRF. The basins and
underlying soil will be remediated under CERCLA actions. The cesium-137 and cobalt-60
radioactivity results stated in the comment are from the sludge contained in the basins and do
not accurately represent the potential radioactivity in the soil.  The basins are known to have
leaked on only one occasion (33,000  gallons in 1971). Although other leaks may have occurred
and gone undetected, they would have been small compared to the 1971 leak. The sludge in
the basins is an accumulation of several years of particulate matter, there is no reason to
believe that the radioactivity concentrations in the soil would be equal to the radioactivity in the
sludge.  Although the sludge sample data are not used in risk calculations, they do help  to
identify potential contaminants of concern that may be present in the soil.

Comment 12

The Plan's exclusion of the NRF  Expended Core Facility (ECF) contaminated soil resulting from
leaks  additionally demonstrates the incompleteness of the so called "comprehensive" Plan  The
ECF.  built in 1958, does not meet current spent reactor fuel storage standards that require
stainless steel liner, leak containment, and leak detection systems. The ECF should be
shutdown for exactly the same reasons the Idaho Chemical Processing  Plant (CPP-603)
Underwater Fuel Storage Facility and the Test Area North Pool were shut down - they are an
unacceptable hazard and do not  meet current standards.  ECF has been leaking significantly
over the past decade and the soil contamination around and underneath the basins must be
included in the CERCLA cleanup process.[Ri/Fs@5-i] The Plan offers no soil sampling data to
substantiate exclusion of the ECF from CERCLA action.  A theoretical risk analysis assumed
only one leak (>62,500 gallons) which does not reflect the actual ECF history and that is why
the sampling data is essential.

Response: There has been only one known leak from the ECF water pits,  which was
evaluated in the NRF Comprehensive RI/FS.  The most significant pathway due to an ECF leak
would be via groundwater.  The risk assessment in the RI/FS used a very conservative
assumption that the entire volume of water immediately migrated to the  aquifer without dilution
and was available for consumption. Even with this very conservative assumption, risks were not
above the National Contingency Plan (NCP) target risk range.  The operational aspects  of ECF
                                          93

-------
with respect to accident analysis, earthquake scenarios, structural integrity, etc., have been
evaluated and documented in the Department of Energy Programmatic Spent Nuclear Fuel
Management and Idaho National Engineering Laboratory Environmental Restoration and Waste
Management Programs Final Environmental Impact Statement.  The Environmental Impact
Statement concluded that present and future ECF operations have very small adverse
environmental impact. In addition, this facility will continue to be operated in accordance with all
applicable regulations and standards.

Comment 13

The Plan's exclusion of the Sewage Lagoon (NRF-23) from its so called "comprehensive"
CERCLA cleanup, again, demonstrates the incompleteness of the Plan. Contaminate levels of
arsenic, mercury, and cesium-137 would normally require remedial action. In fact, the Track 1
investigations recommended inclusion of the lagoons into the comprehensive RI/FS primarily
due to radionuclides and the risk assessment results showed increased cancer rate of 1 in
10,000 from exposure to the site.[pian@25j The Plan offers no data to substantiate the "risk
management decision" to exclude the lagoons. NRF intends to continue to use these unlined
leach pits despite the fact that every gallon of waste water that flows into the pit, leaches more
of the contaminates toward the aquifer below. NRF should  be required to close the Sewage
Lagoons, clean them up, and build new lined ponds that meet current regulations.  U.S.
Geological Survey NRF well sample data confirm ground water inorganic contamination three
orders of magnitude over the Maximum Contaminate Levels (MCL).(DOE/io-22i25@45j Clearly, the
failed waste management practices of the past must end immediately.

Response:  The sewage lagoons were evaluated as part of the NRF Comprehensive RI/FS.
Arsenic and mercury were eliminated as contaminants of concern based upon risk management
decisions that are detailed in Section 20 of the NRF Comprehensive RI/FS. In fact, the
concentrations of arsenic and mercury at the sewage lagoons are below the allowable
concentrations of these contaminants for direct land application of the sewage sludge to
agricultural, forest, and home lawn lands (EPA 822/R-93-001a - Technical Support Document
for Land Application of Sewage Sludge, November 1992).  Discharges to the lagoons remain in
compliance with existing regulations.

The data used to assess the presence of radionuclides in the lagoons were from the 1994-95
Environmental Monitoring Program. This data is the most reliable data available.

The sewage lagoons are clay lined. The clay liner acts to trap constituents present in the
sewage effluent. A hydrogeologic study was performed for  the NRF Comprehensive RI/FS and
conservative assumptions were made during the study.  The clay liner was assumed to leak,
making all contaminants present in the sludge available for  migration.  Even with this
conservative assumption, risks from the groundwater pathway were acceptable.

The 1 in 10,000 (1E-04) chance of increased cancer represents a very conservative estimate of
the cancer risk associated with chemical and radiological constituents present in the sewage
lagoon.  There are uncertainties associated with the calculated risk. For instance, adding the
increased cancer risk from a chemical constituent, such as arsenic, to an increased risk from a
radiological constituent, such as cesium-137, likely overestimates the risk since each
constituent affects humans differently. For this and other reasons, regulatory agencies have not
historically attempted to sum chemical and radiological risks. In any event, the 1E-04 increased
risk falls within the allowable risk range established by the NCP and, considering the
conservative assumptions used in the risk assessment, a decision was made by the agencies
that the risk present at the sewage lagoons is acceptable. The sewage lagoons have been
delineated as a No Further Action site, which requires the decision to be reviewed every five


                                         94

-------
years to ensure this decision remains effective. This review will include newly acquired data
from sampling performed at the lagoons and groundwater sampling.

Wells at NRF have exceeded secondary MCLs for iron. Secondary MCLs are non-mandatory
guidelines that are intended to control the aesthetic quality of drinking water. As discussed in
the hydrogeologic study in the RI/FS, the iron concentrations are highly variable.  For example,
the concentration of iron in a USGS well upgradient of NRF varies from 10 parts per billion (ppb)
to 3,000 ppb. which is ten times the secondary MCLs. This phenomenon is observed often
across the INEEL.  A review of INEEL groundwater data for iron in conjunction with research
associated with the NRF Land Application Permit indicates that the presence ofiron is related to
the unfiltered nature of the samples, the iron being contained in the naturally occurring sediment
extracted during the pumping of well water.  The amount of sediment observed from well
samples is a property of well construction and geology, and does  not appear to be related to
their proximity to NRF facilities.

Comment 14

The preferred alternative 3 that DOE, the State, and EPA want the public to accept cannot be
justifiably called a cleanup plan.  A shell coverup game, yes, but not a cleanup plan.
Alternative 3 is a rerun of the misguided actions at the INEEL Test Reactor Area Warm Waste
Pond.  The NRF Plan calls for the consolidation of the contaminated soil from numerous sites
into the bottom of one of the old leach pits (S1W Leach Pit), then cap it with rocks and gravel.
It's quick, dirty and comparatively cheap; and that's why DOE likes it. With a slight of hand DOE
wants to create a dump without calling it a dump because if they called it a dump then they
would have to comply with hazardous and radioactive disposal regulations.  If it looks like a
duck, walks like a duck, and quacks like a duck then it is a duck. The very moment
contaminated soil is moved from one site to another, a dump is created, and therefore, the
regulations apply regardless what DOE wants to call it.

Response:  Consolidation of contaminated  soil at NRF (Alternative 3) was compared to various
alternatives for soil disposal including complete excavation and disposal at facilities away from
NRF (Alternative 4). Consolidation of soil at NRF rated favorably when compared to the
complete excavation option  (Alternative 4) for short-term effectiveness (more protective of
workers during remedial actions), implementability (much less soil to excavate, package, and
transport), and cost (estimated at $10 million dollars less).  Alternatives 3 and 4 rated equivalent
in overall protection of human health and tne environment and compliance with applicable or
relevant and appropriate requirements (ARARs).  It is important to note that consolidation of soil
at NRF will meet all ARARs.  None of the excavated soil is expected to be hazardous. Also,
strictly speaking, consolidation of existing contamination as part of a CERCLA remedial action
does not constitute formation of a "dump."

Comment 15

The Plan offers inaccurate data to support the preferred alternative.  The Plan states that  the
maximum soil concentration at all of the 8-08 Operable Units for cesium-137 is 7,323
pCi/g(pian@i4).  Appendix H of the RI/FS however credits the S1W Leach Pit with a maximum
detected cesium-137  concentration of 149,759 pCi/g "decay corrected to obtain equivalent 1995
results." [Ri/Fs@H4-22] This contaminate concentration discrepancy is significant because the
undisclosed  higher amount qualifies under NRC radioactive waste Class B criteria in 10CFR §
61.55 and the "technical requirements for land disposal facilities," in § 61.50. The preferred
alternative does not meet NRC requirements.  Actually, DOE's preferred alternative does  not
even meet municipal  garbage landfill requirements under RCRA Subtitle D which require liner,
leachate monitoring wells, impermeable cap. and location restrictions over sole source aquifers
The NRF Plan contains none of these essential features. This Plan effectively shifts the risks,
                                          95

-------
hazards, and ultimate cleanup costs to future generations. The high levels of hazardous
materials in the NRF waste qualify it as a mixed hazardous and radioactive waste under the
1992 Federal Facility Compliance and RCRA Land Disposal Restrictions. Hazardous
contaminates in the soil include chromium at 2,090 mg/kg, lead at 1,140 mg/kg and mercury at
56.1 mg/kg.  EPA's interim lead soil cleanup level is 400 mg/kg.  The Plan offers no Toxic
Concentration Leach Procedure (TCLP) data to support exclusion of this hazardous waste from
regulatory disposal compliance. The transuranic contaminates (americium-241 and
plutonium-238) at 20 pCi/g have half-lives of 432 and 87 years respectively guarantee the waste
will be hazardous for a long time. Under the circumstances, it is difficult to see how the Plan's
preferred alternative can claim to meet all the "Applicable or Relevant and Appropriate
Requirements" (ARAR).

Response:  The  cesium-137 concentration of 149,759 pCi/g identified in the comment was
detected at NRF-12B (S1W Leaching Pit) in 1972. As stated in the RI/FS Work Plan, this
concentration was suspected to be a particle and not representative of actual soil
concentrations; 69 other samples collected from the area between 1972 and 1978 showed a
maximum  cesium-137 activity of 2,600 pCi/g (decay corrected to 1,759 pCi/g in 1995) and a
second highest value of 620 pCi/g (decay corrected to 410 pCi/g in 1995). The sampling
performed in the  1970's was used to determine contaminants of potential concern, but was not
used for risk assessment calculations.  Data collected between 1990 and 1996 were used for
the risk assessment.

Further, the comment states that the 149,759 pCi/g would qualify the soil as NRC radioactive
waste Class B as defined in  10CFR § 61.55. This is incorrect. Even if the 149,759 pCi/g were
representative of the soil contamination, and even if no credit were taken for radioactive decay
since 1972, the contaminated soil would still fall below Class A criteria, which the proposed
cover will meet. (It is also appropriate to note that meeting Class A criteria is not a requirement
for CERCLA actions.)

None of the contaminated soil at the nine sites  of concern is expected to be RCRA hazardous.
The Proposed Plan, which is a summary document of proposed remedial action  alternatives, did
not include all past sample results; however, none of the soil at NRF has been shown to be
RCRA hazardous. The concentrations of metals cited in the comment are total metal results
and do not represent TCLP results. Past TCLP sample results from areas with the highest
metal concentrations did not show levels above RCRA limits.  (TCLP sample results were
presented in the NRF Comprehensive RI/FS Work Plan.) Therefore, no hazardous or mixed
waste is expected to be generated during remedial actions.

The sample result showing 20 pCi/g of americium-241 and plutonium-238 did not distinguish
between the two  radionuclides. A conservative approach was taken that considered both
americium-241 and plutonium-238 to be present at a maximum concentration of 20 pCi/g. As
shown in the Proposed Plan, the 20 pCi/g for either americum-241 or plutonium-238 is still well
below the  risk-based concentration representing an increased cancer risk of 1E-04. The lowest
risk-based concentration was 283 pCi/g for americium-241 and 590 pCi/g for plutonium-238
through the soil ingestion pathway.  Americium-241 at 20 pCi/g represents an increased risk to
a future resident through all exposure pathways of 2E-05.  Plutonium-238 at 20 pCi/g represents
an increased risk to a future resident through all exposure pathways of 5E-06.  These risks fall
within the target risk range as defined in the NCP.

Comment 16

The INEEL Oversight Program's Kathleen Trever claims that the SlWdata set containing the
149,759 pCi/g cesium-137 was not considered reliable by DOE and therefore it was not used in
the Risk Assessment. When asked about this data-set discrepancy, EPA's Wayne Pierre said
                                          96

-------
that DOE could not arbitrarily ignore a data-set unless they had more than 10 data-sets, and
then they could choose the most reliable 10 sets. Since DOE only had three data-sets, Pierre
thought it unacceptable to rely completely on the 1991 and 1992 samples. It is possible that the
earlier sampling grid identified hot spots that the later sampling grids could be planned to avoid.

Response: The cesium-137 activity of 149,759 pCi/g that was detected in one of 70 samples
collected between 1972 and 1978 from the  S1W Leaching Pit area was not ignored.  Each site's
maximum concentration was used throughout the initial evaluation to identify potential
contaminants of concern in the RI/FS work  plan for that site, even though average
concentrations would have shown a more likely contaminant concentration at each site.  The
average concentration for data collected at  the S1W Leaching Pit between 1972 and 1978 was
less than 3,000 pCi/g when including the single 149,759 pCi/g sample, or near 100 pCi/g when
not including the 149,759 pCi/g sample. Sample data collected in the 1970's did not have the
appropriate data quality (e.g., no quality control samples were run. or exact sample location is
unknown) to allow its use in risk assessment calculations, and therefore data collected from
recent sampling events as described in the  RI/FS Work Plan were used for risk assessments.
For the S1W Leaching Pit, a concentration term of 2,040 pCi/g for cesium-137 was used, which
was the highest detected cesium-137 activity from either the S1W Leaching Pit or the adjacent
S1W Leaching Beds during recent sampling. This was very conservative, relative to using the
95% upper confidence limit of the mean concentration, which would have been more realistic.

EPA does not provide guidance concerning the number of data sets necessary for risk
assessment.  EPA does provide information recommending the use of at least ten data points
when  calculating a mean and 95% upper confidence limit used for establishing a reasonable
maximum exposure (RME) level for risk assessment (EPA/540/1-89/002, Risk Assessment
Guidance for Superfund Volume 1 Human Health Evaluation Manual (Part A)).  When there are
fewer than ten data points in a data set, EPA recommends to use the maximum value of the
data set.  Although most data sets consisted of more than ten samples, NRF conservatively
elected, in most cases, to use the maximum value found at each site when performing the
individual site risk assessments.

Finally, later sampling did not avoid the location of the 1972 highest level sample. Rather,
sampling has  been performed all around this area, but the levels found were much less than the
highest 1972 level found.

Comment 17

1971 sampling data buried in the RI/FS show long-term waste mismanagement at the S1W
Leach Pit with cesium-137 at 310,000 pCi/g, cesium-134 at 4,200 pCi/g. hafnium-181 at
20,000 pCi/g,  and cobalt-60 at 1,300,000 pCi/g.iRi/FS@i 591 Algae (accessible to ducks using the
pond) sampling shows 667,447 pCi/g.(Ri/Fs@pgH6.i3] By comparison, the risk based soil
concentration for cesium-137 applied to this Plan is 16.7 pCi/g. These high contamination
levels were due primarily to once through reactor cooling water dumped in the leach pits which
was discontinued by 1980.  No explanation  is offered why the remediation goal applied to Waste
Area Group 3 of 0.02 pCi/g for cesium-137  was changed.

Response: As stated in the RI/FS Work Plan, the 1971 samples were collected from the mud
of the active S1W Leaching Beds. The location and circumstances of the sample collection
were not  recorded. The contaminants detected during historic sampling were only used to
determine potential contaminants of concern, not risk; historic sampling does not represent
current conditions of the leaching bed soil.  Recent sampling evolutions better represent site
conditions.
                                         97

-------
The comment also states that a remediation goal of 0.02 pCi/g for cesium-137 was used at
Waste Area Group (WAG) 3.  WAG 3 does not have a remediation goal of 0.02 pCi/g for
cesium-137, but did use that as a screening level for considering cesium-137 as a potential
contaminant of concern.  WAG 3 cleanup goals are similar to WAG 8 (NRF) cleanup goals.

Comment 18

Alternative 4, Complete Excavation and "Off-site Disposal" is equally unacceptable because
"Off-site" is defined as hauling the contaminated soil from NRF to another INEEL leach pit
consolidation site at the Idaho Chemical Processing Plant, Test Reactor Area, 671he
Radioactive Waste Management Complex, none of which would qualify even as a garbage
dump. Interestingly, DOE calls these "INEEL soil repositories." Therefore, alternative 4 does
not meet legal requirements in the ARAR's.

Response: Alternative 4 would meet the legal requirements in the ARARs. Off-site, as defined
in Alternative 4, means: (1) disposal to a potential soil repository at the Idaho Nuclear
Technology and Engineering Center (INTEC) (formerly the Idaho Chemical Processing Plant
(ICPP)) that would be established through a public input process; (2) disposal to the warm
waste pond at the Test Reactor Area that is currently being used for soil consolidation of other
CERCLA sites; (3) disposal to the Radioactive Waste Management Complex that currently
accepts low-level radioactive waste; or (4) disposal away from the INEEL to a location licensed
to receive the soil and debris from NRF.

Comment 19

The cumulative risk assumptions that determine the exposures to future 100 year residential
and occupational scenarios are not conservative (most protective of human health) and not
supportable. The Plan states: "The ingestion of soil, the ingestion of food crop, and direct
contact with soil through the dermal pathway are not included in the  cumulative assessment
because these involve exposures routes that are not likely to occur at more than one release
site at a time." (Pian@n] A possible future scenario of a pasture over the leach pit, a well over the
Retention Basin, and dermal exposure from digging around the ECF is reasonable. Therefore,
all these pathways must be considered to be cumulative.  The risk assessment must also be
recalculated using the above cited maximum cesium-137 contaminate level of 149,759 pCi/g
which will produce radically different results from the 7,323 pCi/g used by DOE as the maximum
contaminate level at NRF.

Response: The purpose of the cumulative risk assessment was not to add worst case risks
from various pathways across many sites (i.e., soil ingestion risk from one site added to
groundwater ingestion risk at another site). The cumulative risk assessment evaluated the
additive effects of several sites for each cumulative pathway of concern (i.e., dust from one site
intermingles with dust from another site causing an accumulation or higher contaminant
concentration in the dust). The ingestion of soil, the ingestion of food crop, and direct contact
with soil through the dermal pathway are not considered cumulative  because the worst case
scenario for these exposure pathways would be a person residing directly at the site in question.
The individual site risk assessments calculated the worst case scenario risks for these
pathways. Risks via these pathways cannot be any higher through accumulation than the risk
calculated for the individual site with the highest contamination. As an example, a person eating
the maximum expected quantity of site-grown food, all from within the most contaminated area,
cannot also be expected to eat food grown in a less contaminated area. If an individual were to
ingest a mixture of plant material grown at two sites (one with the highest contamination and
one with less), the cumulative effect (risk) to that individual would be less than ingesting all plant
food from the site with the highest contamination. This illustrates why ingestion of soil, ingestion
of food crop, and direct dermal contact are not considered cumulative across different sites.
                                          98

-------
However, the inhalation of dust, groundwater ingestion, and direct exposure to radionuclide
pathways are spatially cumulative. A receptor located at one site breathes air containing
particulates which may have come from multiple sites. In the case of groundwater ingestion, it
is not possible to determine the location of a hypothetical future well. It must be assumed that a
well could be in a location in which it would receive contamination from multiple sites.  The
direct exposure to radionuclides may also be additive if a receptor is located between two sites
and receives exposure from both sites.

The cesium-137 activity used for risk assessments was explained in the response to comment
#15. Regardless of the cesium-137 activity used for the risk assessment, the results would be
the same: based upon either 7,323 pCi/g or 149,759 pCi/g, an unacceptable risk would be
present that requires some type of remedial action. The 16.7 pCi/g remediation goal for
cesium-137 was established to prevent effects from any amount of cesium-137 above this level.
Its selection is independent of the cesium-137 levels at each site.

Comment 20

NRF and DOE representatives stated at a public meeting in Moscow that the groundwater and
aquifer are not at risk because contaminates are absorbed by the soil column. Review of the
historical deep well sampling data at NRF does not support the Navy's conclusion. The NRF
October 1995 Remedial Investigation/Feasibility Study (RI/FS) Appendix K shows Table  III
Deep Well Sample Results for Wells #1, #2, and #3 at 60, 69, and 44 pico Curies per liter
respectively for gross beta. The federal drinking water standard  (MCL) for gross beta is 8 pico
curies per liter.  This deep well sample data confirm that the contaminates do migrate, contrary
to the Navy's claims.  The USGS well sample data previously cited additionally confirm
contaminate migration.

Response:  The data from groundwater wells in October 1976 were described in the 1976
Environmental Monitoring Report as being an abnormality. The laboratory performing the
analysis confirmed that all INEEL wells showed elevated beta activity levels above minimum
detectable levels.  The laboratory concluded that the likely cause was cross-contamination at
the laboratory and not contamination of well water. This is supported by the data collected
during the months prior to and after the October data.

In any event, for risk calculation purposes, some absorption by the soil column is considered.
The absorption is a property of the soil matrix and chemical being absorbed.  No chemical was
assumed to be completely absorbed.

Comment 21

The Plan's "remediation goals" that set risk-based soil concentrations for contaminates of
concern (cleanup goals) fail to include inhalation as an exposure pathway. This exclusion
represents a major flaw in the Plan. Inhalation is the most biologically hazardous for alpha
emitting contaminates of concern listed asamericium-241, neptunium-237, plutonium-238,
plutonium-244, and uranium-235. yet inhalation is not considered for these isotopes, nor for
lead. The wide difference between ingestion of beta/gamma contaminated soil also appears out
of balance.  For instance cleanup goals for cesium-137 external exposure is set at  16.7 pico
curies per gram (pCi/g) while ingestion of soil is set at 24,860 pCi/g. Additionally, the beta
emitter strontium-90 is not considered for external or inhalation exposure but is considered for
soil ingestion at 15,416 pCi/g and food crop ingestion at 45 pCi/g.

Response:  The inhalation exposure pathway was evaluated in the risk assessment presented
in the NRF Comprehensive RI/FS, which was the primary referenced document of the Proposed
                                          99

-------
Plan. The inhalation pathway did not show an increased cancer risk greater than 1E-06 for any
of the contaminants of concern.  It was therefore not necessary to calculate a risk-based
cleanup target concentration for any contaminants through this pathway. Although inhalation of
alpha-emitting radionuclides was a concern and was evaluated during the risk assessment, the
soil concentration would have to be relatively high in order for enough alpha-emitting
radionuclides to become airborne and become a risk driver. The same logic applies to the
inhalation pathway for other contaminants.

The wide variability in acceptable concentrations of radionuclides, depending on both
radionuclide and pathway, is based on how they can affect people.  Radionuclidels that emit
gamma radioactivity can cause a larger direct exposure dose than those that only emit beta or
alpha types of radioactivity (which do not penetrate more than a few inches of air); hence a
relatively low cleanup concentration for gamma emitters may be required to keep direct
exposure doses low, whereas much higher concentrations of non-gamma emitters (e.g., beta or
alpha only) may be acceptable since the doses they can give people are much less. For
cesium-137, the relatively high risk-based concentration through the soil ingestion  pathway
compared to the external exposure pathway is a result of the limited bioaccumulation of
cesium-137 in human tissue during the ingestion process.  In other words,  a large  percentage of
cesium-137 passes through the body, limiting exposure to the radionuclide. The external
exposure pathway assessment assumes a constant source of gamma emitting radioactivity
being present in the soil and assumes the receptor is exposed to the source continually
throughout the exposure duration period, which is more conservative than the assumptions in
some standard computer programs modeling exposures.

Similarly, some radionuclides such as strontium-90,  due to their chemical nature, may be readily
taken up into the food chain, which would result in the need for lower concentrations as cleanup
goals for this pathway (to keep the doses low).  Other chemicals such as cobalt (and hence any
cobalt radionuclides like cobalt-60) may not be readily taken up by plants, and hence even high
concentrations would still be of low risk for this pathway.

The RI/FS essentially picks the lowest acceptable concentration for each radionuclide, from
among the various  pathways, and uses that for the risk-based cleanup goal for that
radionuclide.

Comment 22

An integral factor in the Plan's establishing a "remediation goal" is the maximum concentration
of contaminates of concern. The Plan acknowledges (pg 14) that the maximum cesium-137 soil
contamination detected at the NRF is 7,323 pCi/g which generated a risk based cleanup goal of
16.7 pCi/g.  Again,  as previously discussed, this must be recalculated using the above cited
maximum detected cesium-137 at 149,759 pCi/g "decay corrected to obtain equivalent 1995
results." This significant discrepancy begs the question as to the quality of regulatory review the
State and EPA are bringing to the process and whether the "remediation goals" are supportable.

Response:  The remediation goals are based on risk levels associated with specific post-
remediation concentration limits. The goals are not related to any specific  sample  results.
Regardless of the activity of cesium-137 used for the existing site-specific risk assessments, the
remediation goal of 16.7 pCi/g would not change. The 16.7 pCi/g represents a current present-
day activity level which corresponds to an increased risk of cancer of 1 in 10,000 for a future
100-year resident via the external exposure pathway, which is the exposure route of concern.
Hence, areas below 16.7 pCi/g cesium-137 at the present time would  be acceptable for
unrestricted  release in 100 years.
                                         100

-------
Comment 23

These comments actually apply to both the proposed plans for WAGs 8 and 9, but especially
WAG 8 since containment is part of the preferred alternative for WAG 8.

I am concerned that DOE-ID appears to be using the engineered barrier or rock cover that was
emplaced at the SL1 burial grounds and at the BORAX facility as the prototype barrier for any
subsequent proposed disposal facilities on the INEEL.  This SL1-style rock cover or "barrier" is
part of the containment alternative presented in the proposed plans for both WAG 8 and
WAG 9.  It is well documented that the effect of this rock cover would be to increase infiltration
and minimize evaporation thereby increasing the amount of water available to leach
contaminants from the disposed soil the cover is supposed to protect.  I have read the proposed
plan for WAG 8 and pertinent portions of the WAG 8 Comprehensive RI/FS and see no
acknowledgment that this rock cover will increase infiltration. The fact that this rock cover will
increase  infiltration and leaching should be plainly stated in the proposed plan for the
information of members of the public. If anything, the wrong impression is given in the Overall
Protection of Human Health and Environment section of the proposed plan for WAG 8 (page 16)
where it is stated that Alternative 3 will "minimize infiltration." This last statement is miserably
incorrect  and needs to be changed.

While the groundwater pathway may not have been a risk in the baseline risk assessment for
either WAGs 8 or 9, even with infiltration rates as high as 1 m/yr, it still seems wrong from an
environmental stewardship viewpoint to needlessly install a rock cover that will undoubtedly
increase  leaching from the contaminated soil and increase concentrations of leached
contaminants in the Snake River Plain aquifer. I feel this statement is true even if the  increased
infiltration caused by the rock cover  only incrementally increases contaminant concentration in
the aquifer because there are better cover alternatives. True engineered barriers that provide
the necessary shielding and biotic protection have been designed and are being tested on the
INEEL. These barriers are resistant to erosion and minimize infiltration. These barrier designs
should be given a thorough comparative evaluation to an SL1 -style barrier for use in the
preferred alternative.  This comparison should include analysis of even incremental risk
increases in the groundwater pathway from increased infiltration due to the rock cover.
Hopefully, this comparison will occur since there are words in the Comprehensive RI/FS for
WAG 8 that the proposed rock cover in Alternative 3b is a "conceptual design" and that the final
design will be developed during the  remedial design process.

The WAG 8 Comprehensive RI/FS cites Reith and Caldwell (1990) as stating the proposed
barrier is  appropriate for containment in an arid area. I  have read the article by Reith  and
Caldwell  and, although the article admits that several of these rock covers have been  built at
UMTRA sites, the main point presented in the article is that since vegetated soil covers are
more effective for reducing infiltration and subsequent leaching from contaminated soil,
vegetative covers should be used in semiarid climates to  protect the environment from
contaminated soils rather than simple rock covers. This gives the appearance that the Reith
and Caldwell article is incorrectly cited out of context for purposes of justifying the choice of
engineered barriers.

Response: As stated in the WAG 8 Proposed Plan and the NRF Comprehensive RI/FS, the
cover shown in the Proposed Plan and RI/FS is only one  possible design.  All comments
received  on the cover design will be considered during the remedial action design phase. One
of the purposes of Alternative 3 will be to minimize infiltration to prevent contaminant migration.
Presently, the leaching beds are a depressed pond area with large cobblestone along the
bottom, making an  ideal  infiltration situation, yet sampling has shown very little migration to date
of contaminants of concern. The consolidation of soil in the pond area and the construction of
any type  of cover would actually decrease infiltration compared to what currently exists.  The
                                          101

-------
cover layers may include a low permeability layer or layers of soil with sufficient thickness to
enhance evapotranspiration. A top layer for a vegetation cover will certainly be considered.
The experience gained at NRF during the construction of three landfill caps with vegetation
covers was also valuable. NRF was successful at designing covers which resist erosion and
minimize surface infiltration.  This experience will be put to use during the design of the covers
proposed by Alternative 3.

The purpose for citing the Reith and Caldwell reference was to show that a rock-type cover is a
potential cover in an arid climate, but possibly not an appropriate cover in a humid climate. It
was not intended to justify any cover design.

Comment 24

If the preferred alternative is actually selected and implemented through a ROD, I would hope
that shallow monitoring within the vadose zone beneath the consolidated soil disposal would
occur to verify the assumptions and results that were used in the subsurface pathway flow and
transport modeling that was performed to demonstrate the acceptability of the chosen remedy.

Response: Vadose zone monitoring will be considered during the remedial design phase as
well as various other monitoring methodologies (i.e., radiation surveys, soil sampling, and
groundwater monitoring).

Comment 25

Analyses seem  conservative and thorough. I favor Alternative #3.  If more excavation than that
is considered, extreme care/caution would be needed to insure that close to zero plutonium
compounds are airborne and subject to human ingestion.  No amount of plutonium ingestion is
considered safe. Various isotopes are probably present in minute quantities.

Response: The highest amounts of plutonium detected were in the leaching bed areas that are
not planned for excavation. Even the maximum amount of plutonium  detected in the soil at
NRF, including in the leaching beds, showed risks to a 100-year future resident at 6E-06 for soil
ingestion and 2E-06 for food crop ingestion (the only significant pathways for plutonium).
Current risks to  occupational workers showed a maximum risk of 2E-06 through the soil
ingestion pathway.  Each of these risk values are within the NCR target risk range.

Comment 26

Why do we (you) keep moving and shuffling this radioactive so called hazardous waste around
to contaminate more and more area? We might as well just eat the stuff and be done with it or
sell it to the fertilizer and petroleum industry and let them spread it around.  It would be less
money than INEEL spent fooling  around. Or are you waiting for your  retirement plan to kick in
then you can move far away from ground zero.  No more of your worry!

I think maybe you people are missing something which is filtering into water aquifers and killing
and sterilizing fishes and other living, now dead things.  Why keep stirring the pot to make dust
and fumes fly around to contaminate more! Is this just a job, or do you really care?

Either INEEL or U.S. Postal Service - Thank You - Your mailings didn't get to North Idaho until
the day of the Public Meetings or after not much time to schedule. After the fact. Guess our
highways are slow traffic only.  Thank You. The goat trail to North Idaho.

Response: The contaminated soil to be excavated  will not be RCRA hazardous waste (see
response to Comment #7). The option chosen will decrease the total area of contamination.

                                         102

-------
Controls would be used during soil consolidation to minimize the spread of dust. The sampling
of groundwater monitoring wells around the perimeter of NRF currently measures the quality of
groundwater and helps ensure past operations have not adversely impacted the aquifer.

We apologize for the late notification and, as a result, the comment period was extended for 30
days.

Comment 27

The scope of the proposed cleanup at the Naval Reactors Facility and the discussion at the
Idaho Falls public meeting point once again to a fundamental dilemma facing Department of
Energy cleanup.  That dilemma is ongoing uncertainty, confusion, and disagreement about the
magnitude of the DOE's long-term stewardship responsibilities. On the one hand, nuclear
material should not be dinked with more than necessary, and handling, treating, and
transporting it should occur only when environmental and health protection demands any of
those steps. On the other hand, any residual material presents a risk. The level of residual risk
will obviously affect the level of stewardship required.  Then there is the question of the future
uses for any site—from nature preserve to industrial park to residential neighborhood-which will
also affect stewardship requirements.  Commentors in Idaho Falls raised both these questions.

There is a land use plan for INEEL, and it is our understanding that it is being used by the OOE
and its regulators to guide cleanup under the Comprehensive Environmental Response,
Compensation, and Liability Act.  But that plan was developed through a less than perfect
process with very little public involvement.

Acceptable risk and future use are both topics that deserve and are amendable to wide, ongoing
public discussion, and it is clear that discussion has not yet really begun. This is particularly
unfortunate since, as the decades pass, it's quite likely that stewardship will become more and
more the responsibility of local communities. Some decisions about long-term stewardship
cannot be made for many years, and some we're working from now will no doubt be revisited
The Alliance encourages efforts to engage the public in broad, ongoing consideration of the
long-term stewardship required at INEEL.

Specific to the cleanup of NRF, it is quite frankly a relief that, unlike its spent fuel, the nuclear
navy does not propose to treat and transport to a fare-thee-well the soil it has contaminated at
INEEL.  On the other hand, the environmental benefits of consolidating contamination are not
entirely clear. The nuclear footprint in Idaho will never fit in the glass slipper.

Response:  If contaminants are left on site above risk-based concentrations, CERCLA requires
a review of the selected remedy every five years to evaluate the effectiveness of assumptions.
remedies chosen, and decisions made during the CERCLA process.  One assumption agreed
with by the DOE, EPA, and IDHW was that a Government or institutional presence will be in
place for 100 years.  Although predicting the future land use scenarios has many uncertainties..
the five year CERCLA review process helps accommodate these uncertainties, particularly in
later years. Part of the consideration for the selected alternative was to include institutional
controls that would prevent access to the sites of concern even if there is no longer a
Government presence at NRF.  These institutional controls include fencing or other  barriers,
permanent markers, and legal land use restrictions. Regarding land use, standard INEEL
scenarios were used: on-site workers for near term exposure and residents for 100 years in the
future. Actual future land use decisions were beyond the scope of this study.

The primary benefit to consolidating the soil in a few locations rather than covering each area is
that it is not practical to individually cover or cap several of the sites of concern.  Most of the
sites to be excavated are under concrete basins, below asphalt roadways, or between security
                                          103

-------
fences. Therefore, the only feasible alternatives available for these sites were no action,
additional monitoring, or excavation.  Consolidating soil and placing an engineered cover over
the consolidation area will prevent animal/erosion intrusion while also being designed to limit
maintenance requirements, and reduces overall risk.

Comment 28

The 1995 nuclear waste deal included a commitment from the nuclear navy to spend $45 million
on "discretionary" environmental remediation within five years.  Activities carried forward under
CERCLA are required by law and are not at the polluter's discretion. Without question, the
funds promised in the nuclear waste deal cannot be used for any part of the proposed cleanup
plan under review here. The $45 million raises other questions, though. What, if any, role will
DOE-ldaho, the Environmental Protection Agency, and the State of Idaho have in determining
expenditure of the promised $45 million? What criteria (e.g., downstream health protection) will
be used? More to the point, as required environmental activities at INEEL grow increasingly
problematic both through budget constraints and through the DOE's inability to meet technical
and management challenges, is it appropriate to spend $45 million on discretionary remediation
at all?

Response: The Navy does not intend to spend any of the committed $45 million in
discretionary remediation funding to accomplish CERCLA-required actions discussed in this
ROD. The $45 million in the "Idaho Agreement" documents the Navy's ongoing commitment to
pro-actively remediate site facilities to minimize future environmental liabilities.  Other
decontamination and dispositioning tasks will be accomplished with this funding, with the
objective of obtaining the greatest benefit in the most cost-effective manner. To a large extent,
the Naval Nuclear Propulsion Program uses its discretionary authority to focus funding on
remediation projects addressing the more significant near term risks. See also the discussion of
costs and planned decontamination and dispositioning actions in the response to Comment 39
below.

Comment 29

How did you folks get silver in the parking lot runoff trenches? What are your tire studs made
of?

Response: Silver was only detected above background levels in one sample at 1.25 parts per
million (ppm). The risk-based concentration for silver as calculated in the NRF Comprehensive
RI/FS is 39 ppm. Because there was such a low concentration of silver detected in only one
sample, it is questionable that a source exists. If a source is present, the small fluid leaks and
wear products from automobiles in the parking lot are the most likely source. Alternatively, a
small spill of automotive battery acid contacting an old silver dime could account for such trace
levels.

Comment 30

I have read Snake River Alliance's comment letter dated February  10. 1998, from Beatrice
Brailsford and concur with the contents. I lived in Idaho from 1977  to 1991 and I have always
been concerned about INEEL, nuclear pollution and contamination, the aquifer and the Snake
River.

Response: Please see responses to Comments 27, 28, and 29.
                                         104

-------
Comment 31

Alternative 3 is not less costly than Alternative 4, Complete Excavation and Off-site Disposal.
The Alternative 4 cost analysis was exaggerated by more than 400% of what is commercially
available at a low-level radioactive facility off-site from INEEL through contracts to which the
DOE and  INEEL currently have access.  As a result, Alternative 4 has less construction/capital
costs associated with it, and as indicated in the cost analysis, operation and maintenance costs
for this option are minimal, since all material would be moved to an off-site commercial disposal
facility.
                                                                       —*
Response:  Alternative 4 is significantly more expensive than Alternative 3.  The costs shown in
the NRF Comprehensive  Feasibility Study show a landfill disposal  cost for each site that is
excavated. This cost is estimated to be near $400 per cubic yard.  This not only represents the
disposal fee, but also the  significant additional costs associated with handling, packaging, and
transporting radioactively contaminated soil. Once packaged and ready for shipment the actual
disposal fees may only be $100 per cubic yard. This difference takes into account the additional
requirements needed during handling, packaging, and transporting activities for radioactive soil.

For Alternative 3, once the soil is placed in  the leaching beds and a base layer of clean soil is
placed over the area, cover construction would not require stringent radiological controls.
Alternative 4 would require much more construction activity, to excavate over seven times the
amount of contaminated soil to a depth of over 30 feet (vice 14 feet).

Comment 32

It is arguable that complete excavation and .disposal (Alternative 4) requires more construction
activity than limited excavation and disposal (Alternative 3). Although less material may  be
moved, the construction of a cap and cover system requires significant construction activity and
is potentially equivalent to the limited  excavation option.

Response:  See response to Comment 31  above.

Comment 33

Alternative 3 is not more implementable than Alternative 4. It is stated that Alternative 4  ranks
lowest in implementability because of additional excavation, transportation concerns and the
uncertainty of the availability of off-site disposal facilities.  First, commercial implementation of
projects of this scope are quite routine and  have been proven successful. Commercial
contractors have trained workforces, thus eliminating the training that Alternative 3 requires,
Second, INEEL have successfully transported large quantities of waste from INEEL to
Envirocare of Utah without mishap, thus reducing any transportation concerns. Third, off-site
disposal capacity is prevalent.  Envirocare of Utah maintains a future capacity for low-level
waste in excess of 12 million cubic yards and is accessible through current government
contracts.

Response:  The first option for Alternative 4 is an on-INEEL soil repository that is being
proposed  by the Idaho Nuclear Technology and Engineering Center (INTEC) (formerly the
Idaho Chemical Processing Plant (ICPP)), which would likely be the least expensive of the off-
site (away from NRF) options.  Uncertainty  exists, since the repository has not been
established, which makes the implementability of Alternative 4 using an INEEL soil repository
questionable.  Although projects of Alternative 4's scope have been performed in the past, there
are aspects of Alternative 4 that make it more difficult to implement than Alternative 3.
Alternative 4 would require excavating to a  depth of 30 feet compared to an estimated maximum
depth of 14 feet for Alternative 3. As  previously stated, any work involving radiological controls
                                           105

-------
is less efficient and more difficult to implement. Regardless of the successful transportation of
past INEEL shipments to Envirocare, the additional concerns, regulations, and public sentiment
make transportation of radioactive material along public highways or railways a concern that is
included in the assessment of alternatives. Hence, the agencies believe that Alternative 3 is
easier to implement than Alternative 4.

Comment 34

Alternative 3 required unlimited future surveillance and maintenance, creating an unending
mortgage  cost for the government and citizens. Not only is the cost estimate forthese costs
probably underestimated, but Alternative 4 eliminates these future costs.

Response: The agencies agree that Alternative 3 will require future monitoring and possibly
maintenance; however, the 30 year costs show that Alternative 3 is less expensive than
Alternative 4.  The cover design will limit most maintenance needs. Institutional controls will be
established to limit access and the need for continuous surveillance.  Periodic reviews will
evaluate future monitoring and maintenance requirements. Although future operations and
maintenance (O&M) costs beyond 30 years can be assumed they are expected to be minimal
based on proper cover design and established institutional controls.  The future surveillance and
maintenance costs would be similar for the Federal Government or an NRC regulated
commercial disposal facility; the difference being Alternative 4 applies the cost upfront in the
form of disposal fees. A commercial disposal facility  also introduces potential future liabilities, if
the company ceases to exist or fails to comply with all regulatory requirements.

Comment 35

Overall protection of human health and the environment is not equally served by alternatives 3
and 4. Placement of radioactive waste in an off-site facility licensed and selected for its
suitability for radioactive material and maintained by a specialized staff trained specifically for
this service is more protective than on-site capping.

Response: The overall protection of human health and the environment includes the
evaluation of several criteria,  particularly long-term effectiveness and permanence, short-term
effectiveness, and compliance with ARARs. Both alternatives comply with ARARs. Alternative
4 was judged better for long-term effectiveness and permanence based on the complete
removal of the contaminant source and the reasons cited in the comment.  However, Alternative
3 was judged to have a better short-term effectiveness because less contaminated soil is
excavated and handled.  Both alternatives satisfy the criteria of overall protection of human
health and the environment, and were therefore given an equal rating.  For Alternative 3, an
appropriately trained staff will be employed at  NRF for the remedial actions taken.

Comment 36

The presenters provided comprehensive discussions on the numerous sites assessed at the
NRF during the Comprehensive Remedial Investigations.  These investigations evaluated the
potential for risk to human health from chemical and radiological sources at the NRF as well as
looking into related ecological and hydrogeological issues.

The Coalition 21  has no criticisms or comments on the proposed Plan but reserves the right to
comment at a further date should that be considered necessary by the Coalition's Board of
Directors.

Response: The agencies  appreciate the time and effort made to read and comment on the
Proposed  Plan.
                                          106

-------
Comment 37

I am interested in learning, can a "waterproof material" or "liquid rubber" be sprayed over the 4"
gravel and under the contaminated soils to prevent water from permeating through the
engineered covers?  This water resistant material could be sprayed from a large vehicle or
crane over the site and would "dry or shrink" after being exposed to the environment.

Response:  Technologies that required a barrier to be placed beneath the contaminated soils
were evaluated in the NRF Comprehensive Feasibility Study and were determined to be too
difficult to implement, too costly, and therefore not practical.  The inclusion of a rubber type
material, or impermeable layer, above the contaminated soil will be considered during the cover
design phase of the project.

Comment 38

Can a "sponge like material" or "absorbent" be added to the contaminated soils and liquids that
might help prevent migration  of the contaminated water to a lower aquifer?

Response:  There is no contaminated liquid present at the sites of concern. Infiltration of water
from precipitation events will be minimized by the installation of the cover. See the response to
Comment 4 that discusses the limited migration potential at the sites of concern.

Comment 39

The INEEL CAB  recommends selection of Alternative 3 as the preferred alternative for cleanup
at NRF. It is less costly than  the other alternative which also achieve appropriate risk reduction
objectives.  It also reduces risks to a more acceptable level than the less costly alternatives By
consolidating materials at an  existing site at the NRF, the preferred alternative also minimizes
transportation, risks to site workers, and potential for airborne contamination.

Alternative 3 would involve limited excavation of an estimated 58,080 cubic feet of contaminated
soil and placement of the soil in the S1W leaching beds; containment of on-site disposal areas
with earthen covers; removal to an approved low level radioactive disposal area of
contaminated underground piping and concrete structures; and implementation of monitoring.
fencing, other barriers, and/or land use restrictions.

While the INEEL CAB supports the risk reduction measures that would be achieved through
implementation of Alternative 3, we are concerned about the much higher costs compared to
Alternative 2 and about the accuracy of cost estimates as presented.  The Board recommends
that the Record of Decision (ROD) provide documentation that no other, less-costly alternatives
exist which could achieve the desired risk reduction objectives. In addition, the ROD should
provide documentation of total lifecycle cost estimates for all alternatives to allow comparisons
among them and to document the justification for selecting an alternative which will require long-
term institutional controls and monitoring.

Alternative 2 would involve various institutional controls and additional monitoring.  Long-term
monitoring of the soils and groundwater would continue through the control period. Fencing or
other barriers would be constructed around the sites of concern to inhibit access to the area.
Land use restrictions would be obtained near the end of the control period to prevent excavation
in areas where wastes are contained and would include the placement of permanent property
markers with posted signs.
                                          107

-------
Response:  Section 6.7 of the ROD includes a more detailed cost breakdown than was
presented in the Proposed Plan. This includes the specific costs associated with each action
associated with Alternatives 2, 3, and 4.  Although Alternative 3 is more expensive than the
limited action associated with Alternative 2, the agencies feel the costs are justified.  One
consideration which is not evident from the cost estimate or the comparison of alternatives is
that all sites being excavated as part of Alternative 3 were previously identified as areas of
planned decontamination and dispositioning removals.  The piping and concrete structures at
these sites were not originally part of the CERCLA investigations; only contaminated soils
outside contained systems were the focus of CERCLA investigations. Therefore, some of the
excavation costs associated with these areas were expenses that were part of NRF's planned
future decontamination and dispositioning activities.

The only feasible alternative (as determined in the NRF Comprehensive Feasibility Study) other
than Alternative 3 that could achieve the desired overall protection of human health and the
environment wa.s Alternative 4.  Other technologies were screened out during the development
of alternatives.  The least costly option available in Alternative 4 is likely the disposal of
excavated soil to a soil repository established at the Idaho Nuclear Technology and Engineering
Center (INTEC) (formerly the Idaho Chemical Processing Plant (ICPP)). However, the costs
associated with placing covers over the consolidated areas, which are part of Alternative 3, are
small compared to the costs of excavating over seven times more radiologically contaminated
soil, which is necessary as part of Alternative 4. The actual disposal fees are small compared to
the costs associated with excavating the contaminated soil and preparing the soil for shipment
to a disposal facility away from NRF, For additional cost information see the response  to
Comment 31.

Comment 40

The INEEL CAB members understand that the assumptions used in the risk assessment
process are conservative.  The  Proposed Plan does not describe the assumptions with enough
detail to allow members of the general public to understand.  The ROD should provide  a better
explanation of the risk assessment process and make it understandable to the general  public
(e.g., use quantities people can relate to).

The INEEL CAB also understands that the primary risk imposed by contamination at NRF is
direct exposure.  That fact is not well communicated in the Proposed Plan. It should be better
communicated in the  ROD so as to limit concerns among people living at a distance from the
facility.

Response:  Section 4.1.2.2.2 of the ROD specifically discusses the assumptions made in the
risk assessment. Section 5.1 of the  ROD also more clearly defines that direct exposure to
cesium-137 is the primary risk associated with the sites of concern.

Comment 41

I'm concerned about the proposed engineering design.  My name is Buck Sisson. I live in Idaho
Falls.  I'm concerned  about the  proposed engineered barrier over the top. It has a tendency - -
it will maximize  infiltration, probably collect snow and a lot  of infiltration that is going on, really
accelerating migration that should take place.  I think that would be - - I'm worried about the
engineered burial that is going to maximize infiltration and  it will trap snow, and there won't be
any plants growing, so it will maximize the infiltration and the leaching of the soluble waste.

There are much better alternatives than that. DOE spent quite a bit of money on developing
cap or barrier designs that minimize that leaching effect, and it should be seriously considered.


                                          108

-------
Also the monitoring system should be in place in the vadose zone so you get an early warning if
anything goes haywire. You'd have plenty of time to make remedies and fix it.

Response: See responses to Comments #2 through #5. Vadose monitoring as well as other
monitoring methodologies will be considered during the cover design phase.

Comment 42

My name is Joe Merted. I would like to see a sharing of the technologies and the study data
and the other ways that they have used to make decisions, and I'd like to see the modeling
made available so that we can understand weather and understand groundwater phenomena
and also deep water phenomena at the site and also in our areas. I've noticed in the previous
studies that they've used models for weather forecasting that weren't based on our particular
area. I would like to see a dynamic model of the Snake River Valley developed. I think it would
help not only the site but agriculture and all this. These are probably some of the spinoffs that
could happen from this wonderful science that we're seeing,  and I would like to see more of that
happen.

Response: The development of weather models was beyond the scope of the NRF
Comprehensive RI/FS. No weather models were used; however, weather patterns, including
average precipitation,  temperature, and wind conditions, were assumed to remain the same
during the scenarios evaluated. As identified in Appendix H of the RI/FS, the models used for
evaluating groundwater at NRF included GWSCREEN, MODFLOW, and MEMO.  GWSCREEN
is a groundwater contaminant fate and transport model available to all Federal Governmental
institutions and contractors. MODFLOW is a groundwater flow model that is a public domain
program available  to the public; a copy will be provided upon request.  MEMO is a groundwater
fate and transport dispersive flow model used to optimize placement of groundwater wells, and
is available to Federal Governmental institutions and contractors.
                                        109

-------
Intentionally Blank Page
         110

-------
         Appendix A



Administrative Record File Index

-------
Intentionally Blank Sheet

-------
                    IDAHO NATIONAL ENGINEERING LABORATORY
                  ADMINISTRATIVE RECORD FILE INDEX FOR THE NRF
                  NO ACTION SITES FOR WASTE AREA GROUP (WAG) 8
                                        01/25/95
FILE NUMBER

ARI.6

»      Document #:
       Title:
       Author:
       Recipient:
       Date:

»      Document H:
       Title:
       Author:
       Recipient:
       Date:

*      Document #:
       Title:
       Author:
       Recipient.
       Date:

*      Document #:
       Title:
       Author:
       Recipient:
       Date:

*      Document #:
       Title:
       Author:
       Recipient:
       Date:

»      Document #:
       Title:
       Author:
       Recipient:
       Date:
NO ACTION SITES

5837
NRF-4, SWMU Unit #4 - Top Soil Pit Area
NRF
N/A
01/20/95

5838
NRF-5, SWMU Unit #5 - West Landfill
NRF
N/A
01/20/95

5839
NRF-7, SWMU Unit #7 - East Landfill
NRF
N/A
01/20/95

5840
NRF-24, SWMU Unit #24 - Dcmincralizer and Neutralization Facility
NRF
N/A
01/20/95

5841
NRF-25, SWMU Unit #25 - Chemical Waste Storage Pad
NRF
N/A
01/20/95

5842
NRF-27. SWMU Unit *27 - M.nn Trnnsformer Yard
NRF
N/A
01/20/95

-------
              NO ACTION SITES FOR WASTE AREA GROUP (WAG) 8    01/25/95

 FILE NUMBER
 AR1.6                NO ACTION SITES (continued)

 *       Document*.    5843
        Title:          NRf-30, SWMU Unit #30 - Gatehouse Transformer
        Author:        NRf
        Recipient.      N/A
        Date:          Oi/20/95

 »       Document*:    5844
        Title:          NRf-34, SWMU Unit #34 - Old Parking Lot Landfill
        Author.        NRf
        Recipient:      N/A
        Date:          01/20/95

 *       Document*:    5845
        Title:          NRf-39, SWMU Unit #39 - Old Radiography Area
        Author:       NRf
        Recipient:     N/A
        Date:         01/20/95

 •       Document #:   5846
        Title:         NRf-46, SWMU Unit #46 - Kerosene Spill
       Author:       NRf
       Recipient:     N/A
       Date:         01/20/95

»      Document #:   5847         .  -  .-
       Title.          NRf-57, SWMU Unit #57 -SUV Grave! Pit
       Author:        NRf
       Recipient:      N/A
       Date:          01/20/95

*      Document*:   5848
       Title:          NRf-60, SWMU Unit *60 - Old Incinerator
       Author:        NRf
       Recipient:      N/A
       Date:          01/20/95

»      Document*:   5849
       Title:          NRf-67, SWMU Unit #67 - Old Transformer Yard
       Author:        NRf
       Recipient:      N/A
       Date:          01/20/95

-------
            NO ACTION SITES FOR WASTE AREA GROUP (WAG) 8      01/25/95
FILE NUMBER
AR1.7
INITIAL ASSESSMENTS
»       Document #:
        Title:
        Author:
        Recipient:
        Date:

*       Document #:
        Title:
        Author:
        Recipient:
        Date:

»       Document #:
        Title:
        Author:
        Recipient:
        Date:
       5446
       NRF-4, SWMU Unit #4 - Top Soil Pit Area
       N/A
       N/A
       09/17/86

       5447
       NRF-5, SWMU Unit #5 - West Landfill
       N/A
       N/A
       09/17/86

       5449
       NRF-7, SWMU Unit #7 - East Landfill
       N/A
       N/A
       09/17/86
       Document #:    5466
       Title:          NRF-24, SWMU Unit #24 - Demineralizer and Neutralization Facility
       Author:        N/A
       Recipient:      N/A
       Date:          09/29/86

       Document #:    5467
       Title:          NRF-25, SWMU Unit #25 - Chemical Waste Storage Pad   /
       Author:        N/A
       Recipient:      N/A
       Date:          09/26/86
AR11.4
TECHNICAL SOURCES
       Document #:    NR-IBO-94-076
       Title:          Radioactivity controls In Prototype Plants at the Naval Reactors Facility
       Author:        Newbry, R.D.E.
       Recipient:      Nygard, D.; Pierre, W.
       Date:          03/31/94
NOTE:        This document can be found in Administrative Record Binder, Operable    Unit 8-01,
               Volume I

-------
NOTE: Sampling data are available upon request at NRF.

-------
                    IDAHO NATIONAL ENGINEERING LABORATORY
                  ADMINISTRATIVE RECORD FILE INDEX FOR THE NRF
                     TRACK I INVESTIGATION OPERABLE UNIT 8-01
                                         11/04/94
FILE NUMBER
AR1.7
       INITIAL ASSESSMENTS
       Document ff:   5445
       Tide:          NRF-3, SWMU Unit #3 - ECF Gravel Pitf OU 8-01
       Author:  '      N/A
       Recipient:      N/A
       Date:          09/17/86

       Document #:   5448
       Title:          NRF-6, SWMU Unit #6 - South East Landfill, OU 8-01
       Author:        N/A
       Recipient:      N/A
       Date:          09/17/86
AR3.5
Document #:   5450
Tide:          NRF-8, SWMU Unit #8 - North Landfill, OU 8-01
Author:        N/A
Recipient:     N/A
Date:          09/17/86

       TRACK 1 INVESTIGATIONS
       Document #:    5345
       Tide:           Track I Investigation for the ECF Gravel Pit Unit 8-01-3
       Author:         Westinghouse Electric Corporation - Naval Reactors Facility
       Recipient:       N/A
       Date:           06/24/93

       Document #:    5346
       Tide:           Track 1 Investigation for the Southeast Landfill Unit 8-01-6
       Author:         Westinghouse Electric Corporation - Naval Reactors Facility
       Recipient:       N/A
       Date:           03/17/93

       Document #:    5347
       Tide:           Track 1 Investigation for the South Landfill Unit 8-01-33
       Author:         Westinghouse Electric Corporation - Naval Reactors Facility
       Recipient:       N/A
       Date:           06/24/93

-------
                      TRACK 1 INVESTIGATION OF OU 8-01    11/04/94
FILE NUMBER
AR3.5
TRACK 1 INVESTIGATIONS (continued)
        Document If:     5348
        Tide:           Track 1 Investigation for the Lagoon Construction Rubble Unit 8^01->0
        Author:         Westinghouse Electric Corporation - Naval Reactors Facility
        Recipient:       N/A
        Date:           06/24/93

        Document #:     5349
        Title:           Track 1 Investigation for the East Rubble Area Unit 8-01-41
        Author:         Westinghouse Electric Corporation - Naval Reactors Facility'
        Recipient:       N/A
        Date:           06/24/93

        Document #:     5350
        Title:           Track 1 Investigation for the A1W Construction Debris Area Unit 8-01-63
        Author:         Westinghouse Electric Corporation - Naval Reactors Facility
        Recipient:       N/A
        Date:    .       06/24/93

        Document #:     5645
        Title:           Track 1 Investigation for the North Landfill Area  Unit 8-01-8
        Author:         Westinghouse Electric Corporation - Naval Reactors Facility
        Recipient:       N/A
        Date:           11/30/93
AR1I.4
TECHNICAL SOURCES
       Document #:     NR-IBO-94-076
       Title:           Radioactivity controls In Prototype Plants at the Naval Reactors Facility
       Author:         Newbry, R.D.E.
       Recipient:       Nygard, D.; Pierre, W.
       Date:           03/31/94
NOTE:       Sampling data can be examined at the Woodruff Avenue Complex, 200 South
              Woodruff Avenue.

-------
                    IDAHO NATIONAL ENGINEERING LABORATORY
     ADMINISTRATIVE RECORD FILE INDEX FOR THE NAVAL REACTORS FACILITY
                     TRACK 1 INVESTIGATION OPERABLE UNIT 8-02
                                          11/04/94
FILE NUMBER
AR1.7
INITIAL ASSESSMENTS
       Document*:   5451
       Tide:          NRF-9, SWMU Unit #9 - Parking Log Run-Off Trenches, 01" 8-02
       Author:        N/A
       Recipient:      N/A
       Date:          09/17/86
AR3.5
TRACK 1 INVESTIGATIONS
       Document*:    5351
       Title:           Track 1 Investigation for the Expended Core Facility French Drain
                      Unit 8-02-38
       Author:         Westinghouse Electric Corporation - Naval Reactors Facility
       Recipient:       N/A
       Date:           06/24/93

       Document*:    5643
       Title:           Track 1 Investigation for the South Gravel Pit Unit 8-02-64
       Author:         Westinghouse Electric Corporation - Naval Reactors Facility
       Recipient:       N/A
       Date:           11/30/93

       Document #:    5646
       Tide:           Track 1 Investigation for the Old Sewage Effluent Ponds Unit 8-02-42
       Author:         Westinghouse Electric Corporation - Naval Reactors Facility
       Recipient:       N/A
       Date:           12/01/93
       Document #:    5649
       Title:           Track 1 Investigation for the Old Lead Shack Unit 8-02-52B
       Audior:         Westinghouse Electric Corporation - Naval Reactors Facility
       Recipient:       N/A
       Date:           12/01/93
                                                    4
       Document #:    5650
       Tide:           Track 1 Investigation for the Old Boilerhouse Slowdown Pit Unit 8-02-54
       Author:         Westinghouse Electric Corporation - Naval Reactors Facility
       Recipient:       N/A
       Date:           09/24/93

-------
                       TRACK 1 INVESTIGATION OF OU 8-02   11/04/94
 FILE NT.TVfBER
 ARJ.5        TRACK 1 INVESTIGATIONS (continued)
                                   *
 •       Document/':    5651
        Tide:           Track 1 Investigation for the Parking Lot Run-Off Trenches Unitf-02-9
        Author:         Westinghouse Electric Corporation - Naval Reactors Facility
        Recipient:       N/A
        Date:           11/30/93

 *       Document #:    5653
        Title:      '     Track 1 Investigation for the Old Painting Booth Unit 8-02-37
        Author:         Westinghouse Electric Corporation - Naval Reactors Facility
        Recipient:       N/A
        Date:           11/30/93

 »       Document #:    5656
        Tide:           Track I Investigation for the Site Lead Shack Unit 8-02-47
        Audior:         Westinghouse Electric Corporation - Naval Reactors Facility
        Recipient:       N/A
        Date:           11/30/93

*       Document*:    5719
        Tide:           Track 1 Investigation of die Old Lead Shack Unit 8-02-52A
        Audior:         Wesdnghouse Electric Corporation - Naval Reactors Facility
        Recipient:       N/A
        Date:           06/09/94

»       Document #:    5720
        Tide:           Track 1 Investigation of Miscellaneous NRF Sumps  and French Drains Unit 8-
                       02-55
        Audior:         Wesdnghouse Electric Corporation - Naval Reactors Facility
        Recipient:       N/A
        Date:           06/09/94
       Document #:    5721
       Tide:          Track 1 Invesdgation for die Old Radioactive Materials Storage and Laydown
                      Area Unit 8-02-61
       Author:        Westinghouse Electric Corporation - Naval Reactors Facility
       Recipient:      N/A
       Date:          06/09/94

-------
                    TRACK 1 INVESTIGATION OF OU 8-02    11/04/94
FTLE NUMBER
                              t

AR3.S        TRACK I INVESTIGATIONS (continued)
                                 *
»      Document*:    5722                                                —
       Title:          Track 1 Investigation of the Site Corrosive Area Behind Butler Building 11  Unit
                     8-02-68
       Author:        Westinghouse Electric Corporation - Naval Reactors Facility
       Recipient:      N/A
       Date:          06/09/94

AR11.4       TECHNICAL SOURCES

»      Document #:    NR-IBO-94-076
       Title:          Radioactivity Controls in Prototype Plants at the Naval Realtors Facility
       Author:        Newbry, R.D.E.
       Recipient:      Nygard, D.; Pierre, W.
       Date:          03/31/94

NOTE:        This document can be found in INEL OU 8-01 Administrative Record Binder.

              Sampling data can be examined at the Woodruff Avenue Complex, 200 South
              Woodruff Avenue.

-------
                    IDAHO NATIONAL ENGINEERING LABORATORY
                 ADMINISTRATIVE RECORD FILE INDEX FOR THE NRF
                    TRACK I INVESTIGATION OPERABLE UNIT 8-03
                                        10/21/96
 FILE NUMBER

 AR1.7       INITIAL ASSESSMENTS

 »      Document #:   5452
       Tide:         NRF-10, SWMU Unit #10 - Sand Blasting Slag Trench, OU 8-03
       Author:       N/A
       Recipient:     N/A
       Date:         09/23/86

 »      Document ft:   5457
       Title:         NRF-15, SWMU Unit #15 -SIW Acid Spill Area, OU 8-03
       Author:       N/A
       Recipient:     N/A
       Date:         09/29/86

 *      Document ft:   5460
       Title:         NRF-18, SWMU Unit #18 - SIW Spray Ponds, OU 8-03
       Author:       N/A
       Recipient:     N/A
       Date:         09/29/86

 »      Document #:   5462
       Title:         NRF-20, SWMU Unit #20 - A1W Acid Spill Area, OU 8-03
       Author:       N/A
       Recipient:     N/A
       Date:         09/29/86

 »      Document #:   5464
       Title:         NRP-22, SWMU Unit #22 - A1W Paint Locker French Drain,
                    OU 8-03
       Author:       N/A
       Recipient:     N/A
       Date:         06/23/95

*      Document #:   5465
       Title:         NRF-23, SWMU Unit #23 - Sewage Lagoons, OU 8-03
       Author:       N/A
       Recipient:     N/A
       Date:         09/26/86

-------
                TRACK 1 INVESTIGATION OPERABLE UNIT 8-03    10/21/96
FILE NUMBER
AR2.4
       EE/CA
AR3.5
Document #:   NRFEM-RR-1149                                       —
Title:          Submittal Of Engineering Cost  Estimates For  Track 1  Removal  Actions  For
              Information And Transmittal To The Administrative Record, Naval Reactors Facility
Author:        Nieslanik, R. W.
Recipient:     Manager, Operations
Date:          04/12/94

       TRACK 1 INVESTIGATIONS
       Document It:   NR:fBO-93/046
       Title:         Transmittal Letter and Track 1  Investigation for Unit 8-03-20
       Author:       Newbry, R.D.E.
       Recipient:     Nygard, D.; Pierre, W.
       Date:         03/09/94

       Document #:   10183
       Title:         Track I Investigations for Unit 8-03-22
       Author:       Newbry, R.D.E.
       Recipient:     Nygard, D.; Pierre, W.
       Date:         03/09/94

       Document #:   5652
       Title:         Track 1 Investigation of the SI W Acid Spill Area Unit 8-03-15
       Author:       Westinghouse-Electric Corporation - Naval Reactors Facility
       Recipient:     N/A
       Date:         12/01/93

       Document #:   5723
       Title:         Track 1 Investigation of the Spray Ponds Unit 8-03-18
       Author:       Westinghouse Electric Corporation - Naval Reactors Facility
       Recipient:     N/A
       Date:         06/09/94

       Document tt:   5724
       Title:         Track 1 Investigation of the Sewage Lagoons Unit 8-03-23
       Author:       Westinghouse Electric Corporation - Naval Reactors Facility
       Recipient:     N/A
       Date:         06/09/94

-------
                TRACK 1 INVESTIGATION OPERABLE UNIT 8-03    10/21/96
 FILE NIJTVTBER
 AR3.5
 TRACK 1 INVESTIGATIONS (continued)
        Document #:      5725
        Tide:             Track 1 Investigation of the Site Incinerator Unit 8-03-45
        Author:           Westinghouse Electric Corporation - Naval Reactors Facility
        Recipient:         N/A
        Date:             06/09/94

        Document #:      5726
        Title:             Track 1 Investigation of the Degreasing Facility Unit 8-03-56
        Author:           Westinghouse Electric Corporation - Naval Reactors Facility
        Recipient:         N/A
        Date:             06/09/94

        Document It:      5816
        Title:             Track 1 Investigation of the Sand Blasting Slag Trench Unit 8-03-10
        Author:           Westinghouse Electric Corporation - Naval Reactors Facility
        Recipient:         N/A
        Date:             12/08/94

        Document It:      10048
       • Title:             No Further Action Determination of A1W Paint Locker French Drain,
                         NRF-22
        Author:           Rhodes, S.E.
        Recipient:         Idaho Branch Office of Pittsburgh Naval Reactors Office
        Date:             06/23/95

        Document ft:      NR-IBO-95/003
        Title:             Disposition of NRF Operable Unit 8-03-22, A1W Paint Locker French Drain
        Author:           Newbry, R.D.E.
        Recipient:         Nygard, D.; Pierre, W.
        Date:             02/09/95
AR4.3
PROPOSED PLAN
       Document #:       NR:IBO-94/034
       Title:             Transmittal Letter and Draft Proposed Plan for NRF Operable Units
                         8-03, -20 and 22 (Track 1 Investigations), 8-05 and 06 (Landfill Site
                         Track 2 Investigations, and 8-07 (Exterior Industrial Waste Ditch RI/FS)
       Author:           Newbry, R.D.E.
       Recipient:         Nygard, D.;  Pierre, W.
       Date:             02/28/94

-------
               TRACK 1 INVESTIGATION OPERABLE UNIT 8-03    10/21/96
FILE NUMBER

AR10.6        PRESS RELEASES
                                *
*      Document #:      5640
       Title:            DOE Seeks Public Comment on Industrial Waste Ditch
       Author:          N/A
       Recipient:        N/A
       Date:            03/01/94

AR11.4        "TECHNICAL SOURCES

       Document ff:      NR-IBO-94-076
       Title:            Radioactivity Controls in Prototype Plants at the Naval Reactors Facility
       Author:          Newbry, R.D.E.
       Recipient:        Nygard, D.; Pierre, W.
       Date:            03/31/94

AR12.1        EPA COMMENTS

*      Document #:      10265
       Title:            EPA Comments on Removal Action at Operable Unit 8-03-22 Finalizau'on
       Author:          Pierre, W.
       Recipient:        Newbry, R.D.E.
       Date:            03/08/95

AR12.2        IDHW COMMENTS

»      Document #:      10266
       Title:            IDHW Review of the Remedial Action Recommendations for the A1W Paint
                       Locker French Drain (OU 8-03-22)
       Author:          Nygard, D.
       Recipient:        Newbry, R.D.E.
       Date:            04/10/95
*NOTE:      This document can be found in the INEL OU 8-01 Administrative Record Binder.
NOTE:        Sampling data are available upon request at NRF.

-------
                 IDAHO NATIONAL ENGINEERING LABORATORY
               ADMINISTRATIVE RECORD FILE INDEX FOR THE NRF
                  TRACK 1 INVESTIGATION OPERABLE UNIT 8-04
                                          08/18/95
ADMINISTRATIVE RECORD BINDER I
FILE NU\fBER
AR3.5
TRACK 1 INVESTIGATIONS
       Document ff:    5644
       Tide: .          Track 1 Investigation for the A1W Oily Waste Spill Unit 8-04-31
       Author:         Westinghouse Electric Corpqrauon - Naval Reactors Facility
       Recipient:       N/A
       Date:           12/01/93

       Document #:    5648
       Title:           Track 1 Investigation for the A1W Transformer Yard Unit 8-04-28
       Author:         Westinghouse Electric Corporation - Naval Reactors Facility
       Recipient:       N/A
       Date:           11/30/93

       Document #:    5655
       Title:           Track 1 Investigation for the ECF Acid Spill Unit 8-04-62
       Author:         Westinghouse Electric Corporation - Naval Reactors Facility
       Recipient:       N/A
       Date:           11/30/93

       Document #:    5727
       Title:           Track 1 Investigation for the S5G  Oily Waste Spill Unit 8-04-29
       Author:         Westinghouse Electric Corporation - Naval Reactors Facility
       Recipient:       N/A
       Date:           06/09/94

       Document #:    5728
       Title:           Track 1 Investigation for the Plant Service UST Diesel Spill Unit 8-04-69
       Author:         Westinghouse Electric Corporation - Naval Reactors Facility
       Recipient:       N/A
       Date:           06/09/94

       Document #:    5729
       Title:           Track 1 Investigation for the Plant Service UST Gasoline Spill Unit 8-04-71
       Author:         Westinghouse Electric Corporation - Naval Reactors Facility
       Recipient:       N/A
       Date:           06/09/94

-------
                      TRACK 1 INVESTIGATION OF OU 8-04    08/18/95
FILE NTJMBER
ARJ.5
TRACK 1 INVESTIGATIONS (continued)
*       Document #:     5828                                                  ~"
        Tide:           Track 1 Investigation for the S1W Industrial Wastewater Spill Area 8-04-44
        Author:         Westinghouse Electric Corporation - Naval Reactors Facility
        Recipient:       N/A
        Date:           12/08/94

*  •     Document*:     5829
        Tide:           Track 1 Investigation for the SIW Fuel Oil Tank Spill Unit 8-04-58
        Author:         Westinghouse Electric Corporation - Naval Reactors Facility
        Recipient:       N/A
        Date:           10/25/94

»       Document #:     5830
        Tide:           Track 1 Investigation for the Southeast Corner Oil Spill 8-04-65
        Audior:         Westinghouse Electric Corporation - Naval Reactors Facility
        Recipient:       N/A
        Date:           10/26/94

ADMINISTRATIVE RECORD RIMDER II
       Document #:     5831
       Tide:           Track 1 Investigation for the Boiler House Fuel Oil Release 8-04-70
       Author:         Westinghouse Electric Corporation - Naval Reactors Facility
       Recipient   :    N/A	
       Date:           10/27/94

       Document #:     5832
       Tide:           Track 1 Investigation for the NRF Waste Oil Tank 8-04-72
       Author:         Westinghouse Electric Corporation - Naval Reactors Facility
       Recipient:       N/A
       Date:           10/26/94

       Document #:     5833
       Title:           Track I Investigation for the NRF Plant Services Varnish Tank 8-04-73
       Author:         Westinghouse Electric Corporation - Naval Reactors Facility
       Recipient:       N/A
       Date:        .   12/08/94

-------
               TRACK 1 INVESTIGATION OPERABLE UNIT 8-04
                                                        08/18/95
 FILE NUMBER
 AR3.5
 TRACK 1 INVESTIGATIONS (continued)
 *       Document #:
        Tide:
        Author:
        Recipient:
        Date:

 *     .  Document ff:
        Tide:
        Author:
        Recipient:
        Date:
         5834
         Track 1 Investigation for die Fuel Oil Revetment Oil Releases Doit 8-04-75
         Westinghouse Electric Corporation - Naval Reactors Facility
         N/A
         12/08/94

         5835
         Track 1 Investigation for die Vehicle Barrier Removal Unit 8-04-76
         Westinghouse Electric Corporation - Naval Reactors Facility
         N/A
         10/26/94
       Document #:     5836
       Tide:           Track I Investigation for the Fuel Oil Revetment Oil Releases 8-04-77
       Audior:         Westinghouse Electric Corporation - Naval Reactors Facility
       Recipient:       N/A
       Date:           10/26/94

       Document #:     10049
       Tide:           No Furdier Action Determination for die Underground Storage Tanks Between
                       the Perimeter Fences
       Author:         Rhodes, S.E.
       Recipient:       Idaho Branch Office of Pittsburgh Naval Reactors Office
       Date:           06/23/95                                -
AR11.4
TECHNICAL SOURCES
       Document #:     NR-IBO-94-076
       Title:            Radioactivity controls In Prototype Plants at the Naval Reactors Facility
       Author:          Newbry, R.D.E.
       Recipient:       Nygard, D.; Pierre, W.
       Date:            03/31/94
NOTE:
This document can he found in the INEL OU 8-01 Administrative Record.
NOTE:
Sampling data are availahle upon request at NRF.

-------
                   IDAHO NATIONAL ENGINEERING LABORATORY
                 ADMINISTRATIVE RECORD FILE INDEX FOR THE NRF
                    TRACK 2 INVESTIGATION OPERABLE UNIT 8-05
                                        11/04/94
FILE NUMBER
AR1.7
INITIAL ASSESSMENTS
       Document #:   5443
       Title:         NRF-1, SWMU Unit#l, Field Area North of S1W, OU 8-05
       Author:       N/A
       Recipient:     N/A
       Date:         09/17/86
AR3.14
TRACK 2 SUMMARY REPORT
*      Document*:   NR:IBO-93/301
       Title:         Track 2 Summary Report for NRF Operable Unit 8-05
       Author:       Newbry, R.D.E.
       Recipient:     Nygard, D., Pierre, W.
       Date:         11/15/93
AR3.22
TRACK 2 DECISION STATEMENT
       Document #:   NR:IBO-94/082
       Title:         DOE Decision Statement and Feasibility Study for OU 8-05 and 8-06, and
                    Summary Report for Operable Unit 8-06
       Author:       Newbry, R.D.E.
       Recipient:     Nygard, D., Pierre, W.:
       Date:         04/11/94

       Document It:   5657
       Title:         IDHW-DEQ Recommendations for Track-Two OUs 8-05 and 8-06
       Author:       English, M.
       Recipient:     Newbry, R.D.E.
       Date:         03/23/94
       Document #:   5636
       Title:         Track 2 Summary Report for the NRF OU 8-05
       Author:       Meyer, L.
       Recipient:     Newbry, R.D.E.
       Date:         12/20/93

-------
                      TRACK 2 INVESTIGATION OF OU 8-05    11/04/94
 FILE NUMBER
 AR4.2
FEASIBILITY STUDY REPORTS
 *      Document It:   NR-IBO-94-048
        Tide:          Draft Feasibility Study tor NRF Landfill Areas (Operable Units —
                      8-05 and 8-06)
        Author:        Newbry, R.D.E.
        Recipient:      Nygard, D., Pierre, W.
        Date:          03/11/94

 *      Document #:   5668
        Tide:          Feasibility Study for NRF Landfill Areas (Operable Units 8-05 and 8-06)
        Author:        Newbry, R.D.E.
        Recipient:      Nygard, D., Pierre, W.
        Date:          11/15/93

 AR4.3        PROPOSED PLAN

 »       Document #:    NR:IBO-94/034
        Title:      .    Transmittal Letter for NRF Operable Units 8-03,-20 and 22 (Track 1
                      Investigations), 8-05 and 06 (Landfill Site Track 2 Investigations, and 8-07
                      (Exterior Industrial Waste Ditch RI/FS)
        Author:        Newbry, R.D.E.
        Recipient:      Nygard, D.; Pierre, W.
        Date:          02/28/94

 *       Document #:    5770
        Title:          Proposed Plan for NRF OU 8-03, Sites 20 and 22 (Track 1), 8-05 and 8-06
                      (Landfill Site Track 2) and 8-07 (Exterior Industrial Waste Ditch  RI/FS)
        Author:        INEL Community Relations
        Recipient:      N/A
        Date:          04/01/94
AR5.1        RECORD OF DECISION

•      Document #:   5781
       Tide:          Record of Decision for the NRF Industrial Waste Ditch and the Landfill Areas
       Author:        Naval Reactors Facility
       Recipient:     N/A
       Date:          09/28/94

NOTE:        This document can be found in Administrative Record Binder, Operable Unit 8-07,
              Volume VIII

-------
                    TRACK 2 INVESTIGATION OF OU 8-05   11/04/94
FILE NUMBER

AR10.4       PUBLIC MEETING TRANSCRIPTS
                                 *
*      Document #:    5703                                                 —'
       Title:          Public Meeting Transcripts for the NRF Industrial Waste Ditch and Landfill Areas
       Author:        Ecology and Environment, Inc.
       Recipient:      N/A
       Date:          05/24/94

NOTE:       Thb document can be Found in Administrative Record Binder, Operable Unit 8-07,
              Volume VIII

AR10.6       PRESS RELEASES

*      Document tt:    5640
       Title:          DOE Seeks Public Comment on Industrial Waste Ditch and Landfills at the NRF
       Author:        N/A
       Recipient:      N/A
       Date:          03/01/94

AR11.4       TECHNICAL SOURCES

       Document #:    NR-IBO-94-076
       Title:          Radioactivity controls In Prototype Plants at the Naval Reactors Facility
       Author:        Newbry, R.D.E.
       Recipient:      Nygard, D.; Pierre, W.
       Date:          03/31/94

NOTE:       This document can be found in Administrative Record Binder, Operable Unit 8-01,
              Volume I

AR12.1       EPA COMMENTS

       Document #:    5663
       Title:          Draft Feasibility Study for NRF Landfill Areas (Operable Units (OU) 8-05 and 8-
                     06)
       Author:        Meyer, L.
       Recipient:      Newbry, R.D.E.
       Date:          03/29/94

-------
                    TRACK 2 INVESTIGATION OF OU 8-05   11/04/94
FILE NUMBER
ARI2.2
IDH\V COMMENTS
       Document #:   5664
       Tide:         Review of the Draft Proposed Plan for OU 8-05, 8-06, and 8-07 """
       Author:       English, M.
       Recipient:     Newbry, R.D.E.
       Date:         03/31/94

       Document tt:   5666
       Tide:         IDHW Comments - Review of the Draft Focused Feasibility Study for Operable
                    Uruts (OU) 8-05 and 8-06
       Author:       English, M.
       Recipient:     Newbry, R.D.E.
       Date:         04/04/94

-------
                   IDAHO NATIONAL ENGINEERING LABORATORY
                 ADMINISTRATIVE RECORD FILE INDEX FOR THE NRF
                    TRACK 2 INVESTIGATION OPERABLE UNIT 8-06
                                        11/04/94
ADMINISTRATIVE RECORD VOLUME I
FILE NUMBER                                                        —

AR3.14      TRACK 2 SUMMARY REPORT

•      Document*:   5669
       Title:         Track 2 Summary Report for Naval Reactors Facility OU 8-06
       Author:       Colder Associates, Inc.
       Recipient:     N/A
       Date:         04/01/94

ADMINISTRATIVE RECORD VOLUME II

AR3.21      SCHEDULES

       Document ff:   NR:IBO-94/018
       Title:         Revised Schedules for OU 8-06 and 8-09 Track 2 Investigations
       Author:       Newbry, R.D.E.
       Recipient:     Nygard, D.; Pierre, W.
       Date:         02/07/94

AR3.22      TRACK 2 DECISION STATEMENT

       Document*:   NR:IBO-94/082
       Title:         DOE Decision Statement and Feasibility Study for Operable Units 8-05 and 8-06
                    and Summary Report for Operable Unit 8-06
       Author:       Newbry, R.D.E.
       Recipient:     Nygard, D.; Pierre, W.
       Date:         04/11/94

*      Document #:   5657
       Title:         IDHW-DEQ Recommendations for Track-Two
                    Operable Units 8-05 and 8-06
       Author:       English, M.
       Recipient:     Newbry, R.D.E.
       Date:         03/23/94

»      Document if:   5667
       Tide:         EPA's Preliminary Draft Track 2 Summary Report Comments for die Naval
                    Reactors Facility Operable Unit (OU) 8-06 and Position Statement for OU 8-06
                    Units
       Audior:       Meyer, L.
       Recipient:     Newbry, R.D.E.
       Date:    .     03/30/94

-------
                TRACK 2 INVESTIGATION OPERABLE UNIT 8-06    11/04/94
 FILE NUMBER

 AR4.2        FEASIBILITY STUDY REPORTS
                                 «
 »      Document #:   NR-1BO-94/048
       Title:         Draft Feasibility Study for NRF Landfill Areas                ~"
                     (Operable Units 8-05 and 8-06)
       Author:       Newbry, R.D.E.
       Recipient:     Nygard,  D., Pierre, W.
       Date:         03/11/94

 NOTE:       This document can be found in Administrative Record'Binder, Operable Unit 8-05,
              Volume I

 »      Document #:   5668
       Tide:         Feasibility Study for NRF Landfill Areas (Operable Units 8-05 and 8-06)
       Author:       Newbry, R.D.E.
       Recipient:     N/A
       Date:         04/01/94

AR4.3        PROPOSED PLAN

*      Document #:   NR:IBO-94/034
       Title:         Transmittal Letter and Draft Proposed Plan for NRF OU
                     8-03.-20  and 22 (Track 1), 8-05 and 06 (Landfill Site Track 2) and 8-07 (Exterior
                     Industrial Waste Ditch RI/FS)
       Author:       Newbry,  R.D.E.
       Recipient:     Nygard, D.; Pierre, W.                            --' •
       Date:         02/28/94

*      Document #:   5770
       Title:         Proposed Plan for NRF OU  8-03.-20 and 22 (Track 1), 8-05 and 06 (Landfill Site
                     Track 2)  and 8-07 (Exterior  Industrial Waste Ditch RI/FS)
       Author:       INEL Community Relations
       Recipient:     N/A
       Date:         04/01/94

AR5.1        RECORD OF DECISION

»      Document #:   5781
       Tide:         Record of Decision for the NRF Industrial Waste Ditch and the Landfill Areas
       Author:       Naval Reactors Facility
       Recipient:     N/A
       Date:         09/28/94
NOTE:       This document can be found in Administrative Record Binder, Operable Unit 8-07,
              Volume VIII

-------
               TRACK 2 INVESTIGATION OPERABLE UNIT 8-06    11/04/94


FJLE NUMBER

AR10.4       PUBLIC MEETING TRANSCRIPTS

»      Document*:   5703                                                 —
       Title:         Public Meeting Transcripts for the NRF Industrial Waste Ditch  and Landfill Areas
       Author:       Ecology and Environment, Inc.
       Recipient:     N/A
       Date:         05/24/94
NOTE:        This document can be found in Administrative Record Binder, Operable Unit 8-07,
              Volume VIII

AR10.6       PRESS RELEASES

»      Document #:   5640
       Tide:         DOE Seeks Public Comment on Industrial Waste Ditch
       Author:       N/A
       Recipient:     N/A
       Date:         03/01/94

AR11.4       TECHNICAL SOURCES

       Document #:   NR-IBO-94-076
       Title:         Radioactivity controls In Prototype Plants at the Naval Reactors Facility
       Author:       Newbry, R.D.E.
       Recipient:     Nygard, D.; Pierre, W.
       Date:         03/31/94

NOTE:        This document can be found in Administrative Record Binder, Operable Unit 8-01,
              Volume I

AR12.1       EPA COMMENTS
                                          *

*      Document #:   5663
       Tide:         Draft Feasibility Study for NRF Landfill Areas
                    (Operable Units (OU) 8-05 and 8-06)
       Author:       Meyer, L.
       Recipient: .    Newbry, R.D.E.
       Date:         03/29/94

-------
               TRACK 2 INVESTIGATION OPERABLE UNIT 8-06    11/04/94
FILE NUMBER

AR12.2       IDHW COMMENTS
                                 •
•      Document #:   5664
       Tide:          Review of the Draft Proposed Plan tor Operable Units (OU) 8-05, T-t)6, and 8-07
       Author:        English, M.
       Recipient:      Newbry, R.D.E.
       Date:          03/31/94

*      Document #:   5665
       Tide:          Review of the Preliminary Draft Track 2 Summary Report for Operable Unit
                     (OU) 8-06
       Author:        English, M.
       Recipient:      Newbry, R.D.E.
       Date:          04/04/94

*      Document tt:   5666
       Tide:          IDHW Comments - Review of the Draft Focused Feasibility Study for Operable
                     Units (OU) 8-05 and 8-06
       Author:        English, M.
       Recipient:      Newbry, R.D.E.
       Date:          04/04/94

-------
                   IDAHO NATIONAL ENGINEERING LABORATORY
                 ADMINISTRATIVE RECORD FILE INDEX FOR THE NRF
           EXTERIOR INDUSTRIAL WASTE DITCH RI/FS OPERABLE UNIT 8-07
                                       04/02/96
ADMINISTRATIVE RECORD
FILE NUMBER
AR1.7
INITIAL ASSESSMENTS
*      Document #:   5468
       Title:         NRF-26, LDU #1 - Industrial Waste Ditch, OU 8-07
       Author:       N/A
       Recipient:     N/A
       Date:         09/26/86
AR3.3
RI/FS WORK PLAN
*      Document #:   5195
       Tide:         RI/FS Final Work Plan For the Exterior Industrial Waste Ditch (IWD) OU 8-07,
                    Naval Reactors Facility, Idaho Falls, Idaho
       Author:       Westinghouse Electric Corporation
       Recipient:     N/A
       Date:         09/24/92

       Document #:   NR:IBO-92/328
       Tide:         DOE/IBO Transmittal of Final Work Plan for the RI/FS for the NRF IWD
       Author:       Newbry, R.D.E., DOE-IBO
       Recipient:     Nygard, D., EPA
       Date:         11/26/91	

ADMINISTRATIVE RECORD VOLUME II

AR3.4        REMEDIAL INVESTIGATION REPORTS

       Document*:   NR:IBO-93/l98,VOL. 1
       Tide:         Transmittal Letter and Draft Remedial Investigation Report for NRF Operable
                   .Unit 8-07
       Author:       Newbry, R.D.E.
       Recipient:     Nygard, D.; Pierre, W.
       Date:         07/15/93

-------
            EXTERIOR INDUSTRIAL WASTE DITCH RI / FS OU 8-07    04/02/96
ADMINISTRATIVE RECOUP yPLUME III
FILE NUMBER

AR3.4        REMEDIAL INVESTIGATION REPORTS (continued)

       Document #:   NR:IBO-93/198,VOL. 2                                  -'
       Title:          Draft Remedial Investigation Report for NRF OU 8-07
       Author:        Newbry,  R.D.E.
       Recipient:      Nygard, D.; Pierre, W.
       Date:          07/15/93

ADMINISTRATIVE RECORD VOLUME IV

AR3.12       RI/FS REPORTS

       Document ff:   NR:IBO-93/296,VOL. 1
       Title:          Transmittal Letter and Draft Remedial Investigation / Feasibility Study Report for
                     NRF Operable Unit 8-07 (Exterior Industrial Waste Ditch)
       Author:        Newbry,  R.D.E.
       Recipient:      Nygard, D.; Pierre, W.
       Date:          11/08/93

ADMINISTRATIVE RECORD VOLUME V

       Document*:   NR:IBO-93/296,VOL. 2
       Tide:          Draft Remedial Investigation / Feasibility Study Report for NRF Operable Unit 8-
                     07 (Exterior Industrial Waste Ditch)
       Author:        Newbry,  R.D'.E.                            "
       Recipient:      Nygard, D.; Pierre, W.
       Date:          11/08/93

ADMINISTRATIVE RECORD VOLUME VI

       Document #:   5626, VOL. 1
       Title:          Final Remedial Investigation/Feasibility Study Report for NRF Operable Unit 8-
                     07 (Exterior Industrial Waste Ditch)
       Author:        Lee, S.D.
       Recipient:      N/A
       Date:          02/01/94

-------
            EXTERIOR INDUSTRIAL WASTE DITCH RI / FS OU 8-07    04/02/96
ADMINISTRATIVE RECORD VOLUME VII
FILE NUMBER
                                  *
AR3.12       RI/FS REPORTS (continued)                                   ~~

       Document #:   5626, VOL. 2
       Title:          Final Remedial Investigation / Feasibility Study Report for NRF Operable Unit 8-
                     07 (Exterior Industrial Waste Ditch)
       Author:        Lee, S.D.
       Recipient:     N/A
       Date:          02/01/94

ADIVnMSTRATIVE RECORD VOLUME VTII
AR4.3
PROPOSED PLAN
       Document #:   NR:IBO-94/034
       Title:          Transmittal Letter and Draft Proposed Plan for NRF OU
                     8-03.-20 and 22 (Track 1), 8-05 and 06 (Landfill Site Track 2) and 8-07 (Exterior
                     Industrial Waste Ditch RI/FS)
       Author:        Newbry, R.D.E.
       Recipient:      Nygard, D.; Pierre, W.
       Date:          02/28/94

       Document #:   5770
       Title:          Proposed Plan for NRF OU 8-03,-20 and 22 (Track 1), 8-05 and 06 (Landfill Site
                     Track 2) and 8-07 (Exterior Industrial Waste Ditch RI/FS)
       Author:        INEL Community Relations
       Recipient:      N/A
       Date:          04/01/94
AR5.1         RECORD OF DECISION

»      Document #:   5781
       Tide:          Record of Decision for the NRF Industrial Waste Ditch and the Landfill Areas
       Author:        Naval Reactors Facility
       Recipient:     N/A
       Date:          09/28/94

-------
             EXTERIOR INDUSTRIAL WASTE DITCH RI / FS OU 8-07    04/02/96


 FILE NUMBER

 ARI0.4       PUBLIC MEETING TRANSCRIPTS
                                 •
 •      Document #:   5703
       Tide:         Public Meeting Transcripts for the NRF IWD and Landfill Areas ~"
       Author:       Ecology and Environment,  Inc.
       Recipient:     N/A
       Date:         05/24/94

 AR10.6       PRESS RELEASES

 »      Document #:   5640
       Tide:         DOE Seeks Public Comment on Industrial Waste Ditch
       Author:       N/A
       Recipient:     N/A
       Date:         03/01/94

 AR11.4       TECHNICAL SOURCES

 *      Document #:   NR-IBO-94-076
       Title:         Radioactivity controls In Prototype Plants at the Naval Reactors Facility
       Author:       Newbry, R.D.E.
       Recipient:     Nygard, D.; Pierre, W.
       Date:         03/31/94

NOTE:        This document can be found in Administrative Record Binder, Operable Unit 8-01,
              Volume I ~"~

AR12.0        EPA AND IDHVV REVIEWS

*      Document #:   5196
       Title:          Correspondence between EPA, State of Idaho, and DOE-IBO
       Author:       N/A
       Recipient:     N/A
       Date:          09/24/92

AR12.1        EPA COMlvfENTS

»      Document #:   5634
       Tide:         EPA Comments:  Draft Remedial Investigation for the Exterior Industrial Waste
                     Ditch Operable Unit 8-07
       Author:       Meyer, L.
       Recipient:     Newbry, R.D.E.
       Date:          09/02/93

-------
            EXTERIOR INDUSTRIAL WASTE DITCH RI / FS OU 8-07    04/02/96
FILE NUMBER
AR12.1
EPA COMMENTS (continued)
       Document #:   5638                                                 ~"
       Tide:          EPA Comments: Draft Remedial Investigation/Feasibility Study for the Exterior
                     Industrial Waste Ditch
       Author:        Meyer, L.
       Recipient:      Newbry, R.D.E.
       Date:    '      12/23/93
AR12.2
IDHW COMMENTS
»      Document #:
       Tide:
       Author:
       Recipient:
       Date:
       5635
       IDHW Comments: Technical Review of the Draft RI/FS
       English, M.
       Bradley, T.M.
       09/02/93
       Document #:    5637
       Tide:          IDHW Comments:  Technical Review of the Draft RI/FS
       Author:        English, M.
       Recipient:      Newbry, R.D.E.
       Date:          12/21/93

       Document #:    5664
       Tide:          Review of the Draft Proposed Plan for Operable Units (OU) 8-05, 8-06, and 8-07
       Audior:        English, M.
       Recipient:      Newbry, R.D.E.
       Date:          03/31/94
AR12.3
DOE RESOLUTIONS TO COMMENTS
       Document*:    NR-IBO-93/272
       Tide:          Response to EPA/IDHW Comments On IWD RI Report
       Author:        Newbry, R.D. E.
       Recipient:      Nygard, D.; Pierre,. W.
       Date:          10/04/93

-------
                  IDAHO NATIONAL ENGINEERJNG LABORATORY
               ADMINISTRATIVE RECORD FILE INDEX FOR THE NRF
                   COMPREHENSIVE RI/FS, OPERABLE UNIT 8-08
                                   01/12/98
ADMINISTRATIVE RF.CORD VOLUME I
FILE NUMBER                                                    _

AR1.7       INITIAL ASSESSMENTS

*     Document #: 5444
      Title:        NRF-2, SWMU Unit #2 - Old Ditch Surge Pond, OU 8-08
      Author:      N/A
      Recipient:    N/A
      Date:        09/17/86

*     Document #: 5453
      Title:        NRF-11, SWMU Unit #11 -S1WSB#1: Tile Drain Field, OU 8-08
      Author:      N/A
      Recipient:    N/A
      Date:        09/29/86

*     Document #: 5454
      Title:        NRF-12, SWMU Unit #12 - S1W SB#2: Leaching Pit, OU 8-08
     .Author:      N/A
      Recipient:    N/A
      Date:        09/29/86

*     Document #: 5455
      Title:        NRF-13, SWMU Unit #13 - S1W SB#3: Temporary Leaching Pit,
                  OU 8-08
      Author:      N/A
      Recipient:    N/A
      Date:        09/29/86

*•     Document #: 5456
      Title:        NRF-14, SWMU Unit #14 - S1W SB#4: Industrial Waste Lagoons,
                  OU 8-08
      Author:      N/A
      Recipient:    N/A
      Date:        09/29/86

-------
           COMPREHENSIVE RI/FS, OPERABLE UNIT 8-08     Oi/12/98


FILE NUMBER

AR1.7       INITIAL ASSESSMENTS (continued)

*     Document #:  5458
      Title:        NRF-16, SWMU Unit #16 - SIW Radiography Building Collection
                   Tanks, OU 8-08
      Author:      N/A
      Recipient:     N/A
      Date:        09/29/86

*     Document #:  5459
      Title:        NRF-17, SWMU Unit #17 - SIW Retention Basins, OU 8-08
      Author:      N/A
      Recipient:     N/A
      Date:        09/29/86

*     Document #:  5461
      Title:        NRF-19, SWMU Unit #19 - A1W Leaching Bed, OU 8-08
      Author:      N/A
      Recipient:     N/A
      Date:        09/29/86

»     Document #:  5463
      Title:        NRF-21, SWMU Unit #21 - Old Sewage Treatment Plant, OU 8-08
      Author:      N/A
      Recipient:     N/A
      Date:        09/29/86

ADM1NISTRATJVE RECORD VOLUME II

AR3.3       WORK PLAN

      Document #:  10150
      Title:        Comprehensive Remedial Investigation and Feasibility Study Final Work
                   Plan
      Author:      N/A
      Recipient:     N/A
      Date:        10/01/95

-------
           COMPREHENSIVE RI/FS, OPERABLE UNIT 8-08     01/12/98
FILE NUMBER
            •

AK3.10      SCOPE OF WORK.

*      Document #:  10010                                             —
       Title:        Scope of Work for the Comprehensive Remedial Investigation/Feasibility
                   Study at the Naval Reactors Facility
       Author:      Newbry, R.D.E.
       Recipient:    N/A
       Date:        03/01/95

ADMINISTRATIVE RECORD VOLUME III

AR3.12      RI/FS REPORTS

*      Document #:  10432
       Title:        Final NRF Comprehensive Remedial Investigation/Feasibility Study
                   Report, Appendices A through E, Vol. 1
       Author:      Hutchison, M.E.
       Recipient:    Not specified
       Date:        10/28/97

ADMINISTRATIVE RECORD VOLUME IV

       Document ff:  10432"
       Title:        FinaJ NRF Comprehensive Remedial Investigation/Feasibility Study
                   Report, Appendices E through M, Vol. 2
       Author:      Hutchison, M.E.
       Recipient:    Not specified
       Date:        10/28/97

ADMINISTRATIVE RECORD VOLUME V

A      Document #:  10432
       Title:        Final NRF Comprehensive Remedial Investigation/Feasibility Study
                   Report, Feasibility Study,  Vol. 3
       Author:      Hutchison, M.E.
       Recipient:    Not specified
       Date:        10/28/97

-------
          COMPREHENSIVE RI/FS, OPERABLE UNIT 8-08     08/25/98
FILE NUMBER
AR3.21
SCHEDULE
      Document #:  NR-IBO-96/126
      Title:
       Revision to the NRF Comprehensive Remedial Investigation and
       Feasibility Study Schedule for Operable Unit 8-08
       Newbry, R.D.E.
      Author:
      Recipient:     Nygard, D.; Pierre, W.
      Date:         08/07/96

AR4.3       PROPOSED PLAN

*     Document #:  10440
      Title:         Proposed Plan for Waste Area Group 8 - Naval Reactors Facility Idaho
                   National Engineering and Environmental Laboratory
      Author:       Hutchison, M.E.
      Recipient:     Not specified
      Date:         01/01/98
AR5.4
RECORD OF DECISION REVIEW COMMENTS
      Document #:
      Title:

      Author:
      Recipient:
      Date:

      Document tf:
      Title:

      Author:
      Recipient:
      Date:
       10533
       EPA Comments on Draft Record of Decision (ROD) for the Naval
       Reactors Facility, OU 8-08 at INEEL
       Rose, K.A.
       Richardson, A.N.
       07/06/98

       10534
       IDHW-DEQ Review of the Draft Record of Decision for the Naval
       Reactors Facility, Operable Unit (OU) 8-8
       English, M.
       Richardson, A.N.
       07/13/98

-------
           COMPREHENSIVE RI/FS, OPERABLE UNIT 8-08     08/25/98


 FILE NUMBER

 ARI0.4      PUBLIC MEETING TRANSCRIPTS

 »      Document (f:  16084
       Title:         Public Meeting Transcript for Proposed Cleanup Plans for Naval
                    Reactors Facility and Argonne National Laboratory - West at Boise,
                    Idaho
       Author:       Community Relations
       Recipient:     Not specified
       Date:         01/20/98

 *      Document #:  16085
       Title:         Public Meeting Transcript for Proposed Cleanup Plans for NavaJ
                    Reactors Facility and Argonne National Laboratory - West at Moscow,
                    Idaho
       Author:       Community Relations
       Recipient:     Not specified
       Date:        01/21/98

 *      Document #:  16086
       Title:         Public Meeting Transcript for Proposed Cleanup Plans for NavaJ
                   Reactors Facility and Argonne National Laboratory - West at Idaho
                   Falls, Idaho
       Author:      Community Relations
       Recipient:    Not specified
       Date:        01/22/98

AR11.4      TECHN1CA L SOURCES

*      Document #: NR-IBO-94-076*
      Title:        Radioactivity controls In Prototype Plants at the NavaJ  Reactors Facility
      Author:      Newbry, R.D.E.
       Recipient:    Nygard, D.;  Pierre, W.
      Date:        03/31/94

*NOTE:      This  document can be found in Administrative Record Binder, Operable
             Unit  8-01, Volume I

-------
          COMPREHENSIVE RI/FS, OPERABLE UNIT 8-08      08/25/98


FTLR NUMBER

AR12.1      EPA COMMENTS

»     Document #:  10267
      Title:         EPA Comments on Comprehensive Remedial Investigation and
                   Feasibility Study Draft Work Plan Operable Unit 8-08
      Author:       Meyer, L.
      Recipient:     Newbry, R.D.E.
      Date:         08/28/95

AR12.2      IDHW COMMENTS

*     Document #:  10268
      Title:         IDHW Comments on Review of the Draft Comprehensive Work Plan for
                   the Operable Unit 8-8 Remedial Investigation/Feasibility Study
      Author:       English, M.
      Recipient:     Newbry, R.D.E.
      Date:         08/28/95

AR12.3      DOE RESPONSE TO COMMENTS

•     Document #:  10009*
      Title:         DOE  Response to Comments on Draft Scope of Work
      Author:       Newbry, R.D.E.
      Recipient:     N/A
      Date:         03/24/95

*NOTE:     This document can be found in Administrative Record Binder, Operable
            Unit 8-01, Volume I.

      Document»:  NR:IBO-97/229
      Title:         DOE  Response to Comments from the Environmental Protection Agency
                   and Idaho Department of Health and Welfare Concerning NRF Draft
                   Proposed Plan
      Author:       Newbry, R.D.E.
      Recipient:     Nygard, D.; Pierre, W.
      Date:         12/19/97

Note: Sampling data may be obtained at NRF.

-------
                IDAHO NATIONAL ENGINEERING LABORATORY
             ADMINISTRATIVE RECORD FILE INDEX FOR THE NRF
                TRACK 2 INVESTIGATION OPERABLE UNIT 8-09
                                     08/26/98
 FfLE NUMBER
AR3.10
 SCOPE OF WORK
       Document #:  NR:IBO-93/157
       Title:        Scope of Work for NRF Operable Unit 8-09 Track 2 Investigation
       Author:      Newbry, R.D.E.
       Recipient:     Nygard, D.; Pierre, W
       Date:        06/04/93
AR3.14
TRACK 2 SUMMARY REPORT
      Document #:  NR:IBO-94/139
      Title:         Preliminary Draft Track 2 Summary Report for NRF Operable Unit
                   8-09
      Author:       Newbry, R.D.E.
      Recipient.     Nygard, D.; Pierre, W.
      Date:         06/27/94

      Document #:  NR:EBO-94/187
      Title:         Transmittal Letter and Track 2 Summary Report for NRF Operable Unit 8-
                   09 (Interior Industrial Waste Ditch)
      Author:       Newbry, R.D.E.
      Recipient:     Nygard, D.; Pierre, W
      Date:         09/12/94
AR3.21
SCHEDULES
      Document #:  NR:IBO-94/018
      Title:        Revised Schedules for OU 8-06 and 8-09 Track 2 Investigations
      Author:      Newbry, R.D.E.
      Recipient.    Nygard, D.; Pierre, W.
      Date:        02/07/94

-------
       NRF TRACK 2 INVESTIGATION OPERABLE UNIT 8-09       08/26/98


FILE NUMBER

AR3.22      TRACK 2 DECISION STATEMENT

»      Document #:   10007
       Title:         Action Determination for Operable Unit (OU) 8-09, Interior Industrial
                    Waste Ditch
       Author:       Newbry, R.D.E.; Nygard, D.; Pierre, W.
       Recipient:     NOT SPECIFIED
       Date:         03/23/95

AR11.4      TECHNICAL SOURCES

       Document #:   NR-IBO-94-076*
       Title:         Radioactivity controls In Prototype Plants at the Naval Reactors Facility
       Author:       Newbry, R.D.E.
       Recipient:     Nygard, D.; Pierre, W
       Date:         03/31/94

•NOTE:  This Document can be found in INEL OU 8-01 Administrative Record Binder
  Volume I

AR12.1      EPA COMMENTS

*      Document #:   10536
       Title:         EPA Comments on the Draft Track 2 Summary Report for Naval Reactors
                    Facility Operable Unit 8-09
       Author:       Meyer, L.
       Recipient:    Newbry, R.D.E.
       Date:         08/10/94

AR12.2      IDHW COMMENTS

*      Document #:   10535
       Title:         IDHW-DEQ Review of the Draft Track-2 Summary Report for Operable
                    Unit (OU) 8-9: Interior Industrial Waste Ditch
       Author:       English, M.
       Recipient:    Newbry, R.D.E.
       Date:        08/11/94

-------