United States
           Environmental Protection
           Agency
             Office of
             Emergency and
             Remedial Response
EPA/ROD/R10-89/018
September 1989
$EPA
Superfund
Record of Decision
           Northwest Transformer, WA

-------
50272-101
 REPORT DOCUMENTATION
        PAGE
               1. REPORT NO.
                    EPA/ROD/R10-89/018
                                                                    3. Redpienf'e Acceeelon No.
 4. TO* «nd SublMe
   SUPERFUND  RECORD OF DECISION
   Northwest  Transformer, WA
   First Remedial Action - Final
                                                          5. Report Dele

                                                            09/15/89
 7. AuttiorO)
                                                                    8. Performing Orgwiirtlon Rept No.
 9. Performing OrgeJnlntlon Mune aid AdJran
                                                                    ia ProJect/Teek/WorkUnHNo.
                                                                    11. Contnc1(O or 
-------
                  DO NOT PRINT THESE INSTRUCTIONS AS A PAGE IN A REPORT


                                                     INSTRUCTIONS
Optional Form 272, Report Documentation Page is based on Guidelines for Format and Production of Scientific and Technical Reports,
ANSI 239.18-1974 available from American National Standards Institute, 1430 Broadway, New York, New York 10018. Each separately
bound report—for example, each volume In a multlvolume set—shall have Its unique Report Documentation Page.

 1.  Report Number.  Each Individually bound report shall carry a unique alphanumeric designation assigned by the performing orga-
     nization or provided by the sponsoring  organization In accordance with American National Standard ANSI Z39.23-1974, Technical
     Report Number (STRN). For registration of report code, contact NTIS Report Number Clearinghouse, Springfield, VA 22161.  Use
     uppercase letters. Arabic numerals, slashes, and hyphens only, as in the following examples: FASEB/NS-75/87 and FAA/
     RD-75/09.
 2.  Leave blank.

 3.  Recipient's Accession Number. Reserved for use by each report recipient

 4.  Title and Subtitle. Title should Indicate  clearly and briefly the subject coverage of the report, subordinate subtitle to the main
     title. When a report Is prepared In more than one volume, repeat the primary title, add volume number and Include subtitle for
     the specific volume.

 5.  Report Date. Each report shall carry a date Indicating at least month and year. Indicate the basis on which It was selected (e.g.,
     date of Issue, date of approval, date of preparation, date published).

 6.  Sponsoring Agency Code. Leave blank.

 7.  Authors).  Give name(8) In conventional order (e.g., John R. Doe, or J. Robert Doe). List author's affiliation If It differs from
     the performing organization.

 8.  Performing organization Report Number. Insert If performing organizaton wishes to assign this number.

 9.  Performing Organization Name and Mailing Address. Give name, street, city, state, and ZIP code. List no more than two levels of
     an organizational hlerachy. Display the name of the organization exactly as It should appear In Government Indexes such as
     Government Reports Announcements & Index (GRA & I).

 10.  Project/Task/Work Unit Number. Use the project, task and work unit numbers under which the report was prepared.

 11.  Contract/Grant Number. Insert contract or grant number under which report was prepared.
 12.  Sponsoring Agency Name and Mailing Address. Include ZIP code. Cite main sponsors.

 13.  Type of Report and Period Covered. State Interim, final, etc., and, if applicable, inclusive dates.

 14.  Performing Organization Code. Leave blank.

 15.  Supplementary Notes. Enter Information not Included elsewhere but useful, such as:  Prepared In cooperation with... Translation
     of... Presented at conference of... To be published In...  When a report Is revised, Include a statement whether the new
     report supersedes or supplements the older report

 16.  Abstract  Include a brief (200 words or less) factual summary of the most significant Information contained in the report If the
     report contains a significant bibliography or literature survey, mention it here.

 17.  Document Analysis, (a). Descriptors. Select from the Thesaurus of Engineering and Scientific Terms the proper authorized terms
     that Identify the major concept of the research and are sufficiently specific and precise to be used as Index entries for cataloging.

     (b). Identifiers and Open-Ended Terms. Use Identifiers for project names, code names, equipment designators, etc. Use open-
     ended terms written In descriptor form  for those subjects for which no descriptor exists.

     (c). COSAT1 Reid/Group. Field and Group assignments are to be taken form the 1964 COSATI Subject Category List Since the
     majority of documents are multldlscipllnary In nature, the primary Reid/Group assignments) will be the specific discipline,
     area of human endeavor, or type of physical object The application^) will be cross-referenced with secondary Reid/Group
     assignments that will follow the primary postlng(s).

 18.  Distribution Statement Denote public releasablllty, for example "Release unlimited", or limitation for reasons other than
     security. Cite any availability to the public, with address, order number and price, If known.

19. & 20.  Security Classification. Enter U.S. Security Classification In accordance with U. S. Security Regulations (I.e., UNCLASSIFIED).

 21.  Number of pages.  Insert the total number of pages, Including Introductory pages, but  excluding distribution list, If any.

22.  Price.  Enter price In paper copy (PC) and/or microfiche (MF) if known.

 A GPO:  19830-381-526(8393)                                                                       OPTIONAL FORM 272 BACK
                                                                                                   (4-77)

-------
EPA/ROD/R10-89/018
Northwest Transformer, WA
First Remedial Action - Final


16.  Abstract (continued)

 the soil is PCB.

 The selected Remedial action for this site includes excavation, consolidation, and
treatment of approximately 1,200 cubic yards of soil with a PCB concentration greater
than 10. mg/kg using in situ vitrification; placement of two feet of clean fill over the
entire site; abandonment of an onsite well; and ground water monitoring and sampling of
the wood in the onsite barn to determine if a second operable is necessary to address
PCB-contamination in these media.  The estimated present worth cost for this remedial
action is $771,000 for soil treatment only with no O&M required.

-------
UNITED STATES ENVIRONMENTAL PROTECTION AGENCY
                  REGION 10
              1200 SIXTH AVENUE
             SEATTLE. WASHINGTON
             RECORD OF DECISION,
              DECISION SUMMARY,
         AND RESPONSIVENESS SUMMARY
                     FOR
            FINAL REMEDIAL ACTION
    NORTHWEST TRANSFORMER (MISSION/POLE)
               SUPERFUND SITE
               SEPTEMBER 1989

-------
                               Declaration for the
                       Northwest Transformer (Mission/Pole)
                                 Superfund Site

                               Record of Decision


 Site

      Northwest  Transformer  (Mission/Pole)
      Hhatcom County, Washington


 Statement of Basis and Purpose

      This decision document presents the selected Remedial Action for the
 Northwest Transformer  site  In Whatcom County, Washington, developed 1n
 accordance with the Comprehensive Environmental Response, Compensation, and
 Liability Act of 1980  (CERCLA), as amended by the Superfund Amendments and
 Reauthorlzatlon Act of 1986 (SARA), and, to the extent practicable, the
 National Contingency Plan.  This decision Is based on the Administrative
 Record for this site.  The attached Index Identifies the  Items which comprise
 the Administrative Record upon which the selection of the Remedial Action 1s
 based.

      The state of Washington has verbally concurred on the selected remedy.


 Description of Selected Remedy

      This Record of Decision addresses on-site soil contamination as a first
 operable unit.   The selected remedy is In situ vitrification (ISV).  The
 remedy addresses the principal confirmed threat at the site by significantly
 reducing the risk associated with exposure to the contaminated soil and by
 reducing the potential  for the soil to act as a source for groundwater
 contamination.   The aquifer will  be monitored for contaminant migration and
may have to be  addressed as a second operable unit.

      In addition, there Is a wooden barn on site that will require some
 sampling of the deeper wood matrix to determine whether or not the structure
will need to be treated as a separate operable unit.

     The major  components of the selected on-site treatment remedy include:

     0    Excavation, consolidation, and treatment, via ISV, of approximately
          1200  cubic yards of contaminated soil (soils with a PCS
          concentration greater than 10 ppm (mg/kg)).

     8    Abandonment of the on-site well (in accordance  with Washington  state
          regulations).

     8    Placement of approximately two feet of clean fill over  the entire
          site.

-------
           Implementation  of  a  comprehensive  groundwater  monitoring  program  to
           determine  whether  contamination  Is moving  through  the  aquifer.

           Sampling of  the on-site  wood  structure  to  determine  deeper matrix
           contamination.
  '  The remedy will
significantly reduce
site.
                      destroy  the  PCS  In  the  treated  soils and  therefore
                      the mobility,  toxicity,  and  volume of  contamination on
     Continued groundwater monitoring will  be performed  to ensure  the
 integrity of  the aquifer  as a drinking water source.  If groundwater analyses
 indicate contamination at a concentration  in excess of the accepted
 U.S. Environmental Protection Agency (EPA)  and  state of  Washington
 health-based  levels, further action will be initiated as a separate operable
 unit.
Declaration

     The selected remedy  is protective of  human  health and  the  environment,
attains federal and state requirements that are  applicable  or relevant  and
appropriate to the Remedial Action, and  is cost  effective.   This  remedy
satisfies the statutory preference for remedies  that employ treatment that
reduces toxicity, mobility, or volume as a principal element and  utilizes
permanent solutions and alternative treatment  technologies  to the maximum
extent practicable.  Because this remedy will  result In hazardous substances
remaining on site (I.e.,  soils with a PCB  concentration less than 10 ppm
(mg/kg)). a review will be conducted within five years after commencement of
remedial actlcri to ensure that the remedy  continues to provide  adequate
 'Otectlqfi g£ rtguxf'y health ^n/d the environment.
Robie G. Russell            i
Regional Administrator      \
U.S. Environmental Protection
                                           Date

                              Agency, Region 10

-------
                      NORTHWEST TRANSFORMER (MISSION/POLE)
                                 SUPERFUND SITE
                               RECORD OF DECISION
                                Decision Summary

                                TABLE OF CONTENTS

                                                                 Page
I.   Site Description                                             5
II.  Site History and Enforcement Activities                      5
III. Community Relations History                                 10
IV.  Scope and Role of Response Action                           11
V.   Site Characteristics                                        12
VI.  Summary of Site Risks                                       15
VII. Documentation of Significant Changes                        22
VIII. Description of Alternatives                                24
IX.  Summary of the Comparative Analysis of Alternatives         30
X.   The Selected Remedy                                         39
XI.  Statutory Determinations                                    41
XII. Responsiveness Summary                                      49
Administrative Record Index                                      58

-------
 I.    Sjte  Description

      Location

      The Northwest Transformer Salvage Yard (Mission/Pole) site (hereafter
      referred  to as  the Northwest Transformer or NUT site) is located
    .approximately two miles  south of Everson in Whatcom County, Washington
      (Figure 1).  The site,  located  immediately southwest of the intersection
      of Mission and  Pole Roads, occupies approximately 1.6 acres in the NE 1/4
      of the NE 1/4 of Section 12, Township 39 N, Range 3 E, Willamette
      Meridian. .

      Topography

      The NWT site is located  in the  Nooksack River basin.  The basin lowlands
      lie west of the foothills of the Cascade Mountain Range and east of the
      Strait of Georgia and Bellingham Bay.  The topography of the lowlands is
     "the result of glaciation from the Fraser Glaciation, which left westward
      trending streams and surface glacial features.  The region Is dissected
      by the Nooksack River and its tributaries.   The course of the Nooksack
      River Is dominated by the topography, which has a low gradient, and to a
      lesser extent, by geologic structure.  The river flows northward less
      than one mile east of the site; however, the site does not lie In the
      flood plain.  The elevation at  the site is approximately 120 feet above
      mean sea level.

     Adjacent Land Uses

      The site is bordered by  low density residential areas to the north and
     east,  and by agricultural fields to the south.  A small  gravel pit is
      located approximately 500 feet  to the west.  Land use in the area is
     comprised mainly of rural homesteads, dairies, and farms, with
     approximately 200 persons living within a one-mile radius of the site.

     Surface and Subsurface Features

  .   The soil  In the  area Is glacial outwash consisting of silt, sand and
     gravel.   Cobbles are commonly present at depths greater than three feet.
     Well  logs  for wells within 2,000 feet of the site indicate that the water
     table  is  encountered between 17 and 40 feet below ground surface.  It was
     approximately 30 feet below ground surface during the summer months at
     the NMT site.  At least 27 domestic wells surround the site within a
     one-half mile radius.   Many of  these wells use the water table aquifer at
     40 to  50 feet for a drinking water source.   Saline water generally-occurs
     at a  depth of 100 feet or more  beneath the lowland area.  There is a
     wooden structure (an old barn) on the northwest corner of the site (see
     Figure 2).
II.   Site History and Enforcement Activities

     The NWT site was primarily used for the storage and salvage of
transformers prior to final disposition (disposal/sale as scrap) or
transportation to another facility for recycling.  As many as several hundred
transformer casings were stored at the unsecured site.  The casings were

-------
                                    BRITISH COLUMBIA
                                     WASHINGTON
  WHA TCOM
                         COUNTY  2
                          Suptrfund Sit•
                                             WASHINGTON
                            B«llingham
figure 1
Northwest Transformer
   MUslon/Pol« Sit*

-------
              LEGEND
                 3FCOTBORNG
                 SURFACE SAMPLES
                 DEEPBORNGS
                 5FOOTBOHNQS
                 MONfTORNQtMEUS
                 APPROXIMATE EXCAVATION AREAS
                                                                      T.B.M.
r^titei^
»v >»•»•*<»«&«•******A* *»*«)^
I         i   '
                    ^INCINERATOR
                       PIT AREA
B
                             Figure 2
         Surface Soil Concentrations of RGBs (ppm)
                    Northwest Transformer Site
                        Everson, Washington

-------
 placed  directly on  the  ground, and  there were no provisions for weather or
 spill protection.   Activities at the NWT site Included storage of
 transformers;  removal of  dielectric fluids from the transformers (the primary
 source  of  PCB  and related compounds); burning of recovered oils in a space
 heater  to  provide heat  for the barn; dismantling of transformers in the barn;
 burning of casings  and  associated parts in an air curtain open pit
 Incinerator; and scrap  metal reclamation.  The open pit Incinerator was a
 concrete structure  sixteen feet long and eight feet wide with a manifold
 designed to blow 8,000  cfm of air into the combustion zone.  The incinerator
 operated at temperatures  of approximately 1,000 to 1,200° F.  During operation
 of  the  site, spillage and leakage of the PCB-laden oil onto the ground surface
 appeared to have occurred frequently.  In addition, It Is suspected that PCB
 oil was dumped directly into a seepage pit (sometimes referred to as the
 septic  tank),  in the southeast portion of the site (see Figure 2), where it
 would seep out into the surrounding soil.  This structure consisted of a pit
 with wooden walls and a wooden cover with an access hole.  The top was located
 at  the  ground  surface and the bottom was approximately six to eight feet below
 the surface.

     The NHT facility has  been inspected several times since 1977.  Soil
 samples have been collected on a number of occasions.  In 1977 EPA analyzed
 two samples which revealed a total polychlorinated biphenyl (PCB)
 concentration of 80 ppm (mg/kg) for Arochlors 1248 and 1254 In soil near the
 Incinerator (see Figure 2)  and 510 ppm (mg/kg) for Arochlor 1260 at a location
 within  the  transformer  storage area.  In 1979 EPA analyzed two samples from
 oil-stained areas of soil  and found total PCB concentrations of 41 and 60 ppm
 (mg/kg).   In February 1981, EPA collected and analyzed a sample from the
 Incinerator area which  Indicated the presence of PCB at a concentration of 160
 ppm (mg/kg).  Samples were collected by the Washington Department of Ecology
 (Ecology)  during an August 1984 site inspection In which two soil samples from
 an oil-stained area near  the roadway indicated PCB levels at 6.3 and 0.72 ppm
 (mg/kg).

     In August of 1981. the company was cited and fined by EPA for violations
 of recordkeeping, marking,  storage, dating, and disposal requirements of the
 Toxic Substances Control  Act (TSCA) PCB Regulation 47 CFR Part 761.

     Groundwater sampling  results have been Inconsistent.  In February 1981,
 sampling of four wells  showed low levels of PCB (0.05 to 0.11 ug/1) using a
detection  limit of  .015 ug/1, while In December of 1981, sampling of eleven
wells surrounding the site  (Including the four wells sampled In February 1981)
 showed no evidence of PCB contamination using a detection limit of  .015 ug/1.

     Between April   1983 and April 1984, groundwater samples were collected on
a periodic basis from domestic wells near the site by the Whatcom County
District Department of  Public Health.  PCB was detected in several  samples at
 concentrations slightly above the minimum detection limit of 0.50 ug/1.

     In  1984,  the site  was  added to the National Priorities List  (NPL) under
CERCLA.

-------
      A comprehensive  soil  sampling  effort  was  completed  in March  1985 by  the -
 EPA Region  10  Field Investigation Team  (FIT).  Sample  analyses  indicated  PCB
 soil  contamination at the  facility  to be as  high as  38,000 ppm  (mg/kg), with
 significant concentrations detected at  various depths  and locations around the
 site.

    .  Five samples were  also collected during the March FIT sampling effort and
 analyzed for the presence  of the full range  of dioxin  and furan  isomers.
 Three  composite surface  samples were collected from  the  perimeter of the
 incinerator pit.  Each  composite consisted of  soil from  four discrete points
 which  were  equally spaced  around the pit and close to  the edge.   In addition,
 an  uncomposited sample  was collected from  the middle of  the field south of the
 site.   A background sample was obtained from an area near Pole  Road,
 approximately  one-half  mile west of the site.  Analytical results indicated
 that  dioxin and furans  were present at  concentrations  well below  1 ppb (ug/1).

      In March  of 1985,  EPA issued a CERCLA 106 Order to  the owners of the
 company requiring that  they take immediate action to mitigate the threat  to
 public  health  and the environment.

      In April  and May of 1985, the  EPA  Technical Assistance Team  (TAT)
 Emergency Response Cleanup Services  (ERCS) Implemented an Immediate Removal
 Action  (IRM).  Activities  Included  the  following:

     0    Enclosure of  the site with a  chain-link fence.

     9    Excavation  and disposal of approximately 1,400 cubic yards of
          contaminated  soil  and solid materials (barn  soil/concrete, six-inch
          surface scraps,  12  to 18  inch excavations. Incinerator  pit
          excavation  and seep pit area  excavation, 12  to 18 feet  below the
          ground surface.)

     0    Draining, rinsing,  and cleaning of thirty-five transformers.

     0    Removal of  approximately  6,000 gallons of  PCB-contamlnated liquids
          (less than  500 ppm (mg/1)).

     0    Removal of approximately  660  gallons of PCB-contaminated liquids
          (greater than 500 ppm (mg/1)).

     0    Removal of four  transformer casings and one  drum found  to be
          contaminated by  PCB (greater  than  500 ppm  (mg/1)).

     8    Decontamination  of  concrete and  selected wood  surfaces  of the barn.

     0    Installation of  five groundwater monitoring  wells and  sampling  of
          the associated soil and groundwater.

     0    Two rounds of domestic well sampling: first  round, twenty-one
          residences,  and  second round, sixteen residences.

     The NWT site was significantly altered  by the IRM In 1985.   The purpose
of the  Remedial Investigation (RI)  was  to  gather sufficient  information and
data to characterize  the degree and extent of  contamination  (if any)  remaining
at the  site.

-------
      In June of 1987, the Remedial Investigation/Feasibility Study (RI/FS)
 sampling effort took place.  The scope of the RI included:

      •    Collecting and analyzing four ditch samples Immediately outside of
          the security fence to determine if there  was any off-site soil
          contamination.

      •    Collecting and analyzing forty-eight randomly-located surface soil
          samples to determine the degree and extent of contamination.
          primarily In areas that were not disturbed by the IRM.

      0    Collecting and analyzing surface and subsurface soil  samples  from
          shallow (five-foot) borings at fifteen locations which  were
          determined to be "hot spots" prior to the IRM.  The locations are
          primarily south of the barn and are in an area that had six inches
          to one foot of soil removed during the IRM.

    •°    Collecting and analyzing surface and subsurface soil  samples  from
          deep (twenty- to forty-foot) borings at three locations near  the
          former septic tank area.  This area was excavated during the  IRM.

      0    Collecting and analyzing surface and subsurface soil  samples  from
          one shallow (three-foot) boring in the area of the former
          Incinerator pit to determine the degree and extent of contamination
          remaining.  This area was overexcavated at least one foot during the
          IRM.

     0    Collecting and analyzing two surface soil samples and one wood
          sample from the barn to verify the effectiveness of the
          decontamination effort during the IRM.

     0    Collecting and analyzing background soil  samples from locations that
          could not have been reasonably impacted from site operations.

     •    Collecting and analyzing groundwater samples from five  on-slte
          monitoring wells and four off-site residential wells to determine
          the degree and extent of groundwater contamination.


III.  Community Relations History

     Community relations activities conducted for the NHT site to date include
the following:

          In 1984 the site was added to the NPL under CERCLA.

          In May 1985,  EPA began an IRM at the site (see Section II).  EPA
          addressed community Information needs about the action at  that  time
          through press releases.

     8    In March 1986 community interviews were conducted  in preparation  for
          the community relations plan.

     0    The RI field Investigation began in June 1987.  This was announced
          In a May 1987 fact sheet sent to all citizens and  local officials on
          the EPA mai1 ing list.


                                       10

-------
      e     In  July  1988,  a  fact  sheet updating progress at the site was sent to
           all  people on  the  EPA mailing  list.

      0     The  proposed plan  was mailed out on August 17, 1988.

   .   8     On August 17,  1988, EPA placed a public notice in the local
           newspapers announcing the following:

                0    Brief  description of the  investigation results.

                0    Public comment period running from August 17 to
                    September 21.

                0    Location of the information repositories.

                    EPA  contacts.

      0     Potentially Responsible Parties 
-------
     The potential threat posed by contaminated groundwater associated with
 the site is uncertain.  Analyses of samples obtained from on-slte wells
 Indicate low levels of contamination; however, analyses of samples obtained
 off site are Inconclusive.  A groundwater monitoring program that is designed
 to 1) detect trace levels of PCS in the aquifer and 2) more clearly define
 aquifer characteristics will be Implemented to allow for a better assessment
 of the risk, If any. due to the use of groundwater as a drinking water
 source.  If groundwater analyses indicate groundwater contamination in excess
 of the EPA and state of Washington health-based levels, groundwater will  be
 acted on as a separate operable unit.

     In addition to soils and groundwater, there is a wooden structure (an old
 barn) on site that was used for transformer repair and storage.   The barn was
 heated at times by burning PCB-contamlnated oil.  Surflcial  samples (I.e.,
 wood shavings) were obtained during the RI and analyzed for PCB
 contamination.  The analyses indicated PCB concentrations below 1 ppm (mg/kg);
 however, core samples will be required to determine the extent of at-depth
 contamination.  If core samples Indicate significant levels of PCB In the
wooden structure, the barn will be acted on as a separate operable unit.


V.   Site Characteristics

     Contaminant Characteristics

     The contaminant of concern at the NWT site is PCB, primarily Arochlor
     1260.   It Is unlikely that free-flowing PCB-bearing fluids (I.e.,
     transformer dielectrics) are still  present at the site.  PCB Is readily
     adsorbed onto soil particles and does not easily leach from soil.
     Adsorption of PCB by soil  Is related to the organic content of a
     particular soil  type, and  PCB recovered from soil Is found to concentrate
     In the organic fraction of the soil media.  The low water solubility and
     low volatility of PCB also suggest that it is partitioned most heavily
     Into the organic fraction  of soil.   The rate of PCB movement In saturated
     soil  has been found to be  between one-tenth and one-hundredth the rate of
     groundwater movement.

     Affected Matrices Characteristics

     For  site management, stabilization, and cleanup purposes, the NWT site
     can  be divided Into specific affected matrices.

     The  following discussion summarizes the characteristics and volumes of
     each matrix that are relevant to the Identification, screening, and
     selection  of remedial technologies and strategies.

         Soil

         The contaminant of concern in the soil is PCB.  The
         trl-tetrachlorobenzenes were not included in analyses because these
         more  volatile compounds were not expected to be persistent  in
         surface soils,  especially considering the length of time between  the
         EPA IRM and the RI sampling effort.  The distribution of PCB
         contamination in the  surface soil is shown in Figure 2 (p.7).   PCB


                                       12

-------
 contamination  has  been  shown  to exist at  levels exceeding the
 April  1985  IRM cleanup  level  of 10 ppm  (mg/kg) in two areas:  1) the
 area  south  of  the  barn  and 2)  the former  seepage pit area
 (Figure  2).  PCB concentrations between 1 and 10 ppm (mg/kg) exist
 In  surface  soil throughout the site.

 During the  July 1987  RI,  shallow subsurface samples were taken from
 2.5 and  5.0 feet below  ground  surface at  selected locations. The
 principal contaminant of  concern in these samples was PCB.   The
 trl-tetrachlorobenzenes were  not detected in the samples.  Results
 indicated that  PCB contamination generally decreased with depth and
 that  the PCB levels were  at or below 1  ppm (mg/kg) below the depth
 of five  feet.   The PCB  analytical data  show concentrations  at or
 above  10 ppm (mg/kg)  in the area just south of the barn.  Analytical
 data  indicate  that below  2.5  feet some  PCB concentrations are
 between  1 ppm  (mg/kg) and 5 ppm (mg/kg).  PCB concentrations in the
 subsurface  soil in the  seepage/septic tank area range between 1 to
 10 ppm (mg/kg)  at a depth of  19 feet.

 The volumes of  soil within the ranges of  PCB contamination reported
 In the FS are  shown in  Table  1.

 The surface area of the site  is approximately 70,000 square feet
 (7,778 square yards) or approximately 1.6 acres.

 Groundwater

 There are two  current primary PCB sources relative to groundwater
 contamination beneath the NWT  site and  vicinity.  First, historical
 dumping of  potentially  high but undocumented concentrations of PCB
 in the seepage  pit may  have resulted In significant PCB migration
 into groundwater In the past.  This high  level contamination could
 act as a future source of groundwater contamination by PCB.  The
 current  low level  PCB soil contamination  can be considered a second
 source.  The soil  PCB contamination could act as a constant low
 level source of groundwater contamination until  the site is
 remediated.

 Based on the results of this  RI and previous investigations, PCB
 contamination  in groundwater  has not been adequately characterized
 to assess the  lifetime  incremental cancer risk through ingestion of
 contaminated water, nor have  the groundwater flow patterns been
 fully determined.

On-Slte Structure (Barn)

 During the  IRM.-a significant  amount of washing, rinsing, and
 sandblasting of the surface of wooden structural members inside  the
 barn was conducted: however,  there is uncertainty as to  the
 effectiveness of the decontamination of the deeper wood  matrix of
 the barn.  Core samples of the wood must  be analyzed for PCB before
all  remediation alternatives,  including the no action alternative,
 can be evaluated for the  barn.
                              13

-------
     TABLE 1      NORTHWEST TRANSFORMER:   ESTIMATED  VOLUMES
                 ASSOCIATED WITH SURFACE  SOIL CLEANUP  LEVELS

RESIDUAL PCB
CONCENTRATION
(PPM)

40
32
24
16
10
8
5
1

EXCAVATION
DEPTH IN
10 PPM AREA
(ft.unm
0.0
0.5
1.0
1.5
1.9
2.0
2.2
2.5

VOLUME OF
SOIL FROM
10 PPM AREA
(cu.vd.Hli
0
313
625
938
1,172
1,250
1,367
1,563
VOLUME OF
SOIL FROM
AREA BETWEEN
10 AND 1 PPM
(cu.vd.un
0
0
0
0
0
171
468
964

TOTAL
VOLUME OF
SOIL
(cu.vd.)
0
313
625
938
1,172
1,421
1,836
2,526
(1)   See Figure 2   for isoconcentration contours.
(2)   Assume that concentration decreases from surface  (avg
     ft.  depth (1 ppm)  In a linear manner.
40 ppm) to 2.5
                                    14

-------
           Migration  Pathways

           The  transport of  the  chlorinated contaminants In the environment is
           controlled  by their physical properties.  Three potential pathways
           of migration exist:   groundwater, air, and surface water.

           The  potential for airborne migration of PCS from the site is
           minimal.   The contaminants, especially the more chlorinated isomers,
           are  not highly volatile.  Also, the high equilibrium binding
           constant for PCS  in soil  indicates that contaminants bind tightly to
           the  soils.  Heavy vegetation on the site virtually eliminates any
           migration of contaminants on particulates generated from wind
           erosion.   If surface  vegetation is removed, the resulting wind
           dispersion  of existing contaminated surface soils is not expected to
           result In off-site PCS contamination greater than one mg/kg based on
           results of  background soils and on-slte surface soils obtained In
           July 1987.

           Likewise, the potential for transport of PCS from the site via
           surface water Is minimal.  Due to the very high permeability of the
           soils at the site and relatively flat topography, surface water
           runoff from the site  Is minimal.

           It Is for these reasons that the major potential pathway of
           contaminant migration Identified for this site Is the regional
           groundwater system.   PCS  is readily absorbed from water by solid
           particles and only slowly leaches from soils.  PCB has poor mobility
           through saturated soil.  Downward movement of contaminants would be
           effected very slowly  by water infiltration from precipitation
           coupled with sorptlon/desorptlon mechanisms based on contaminant
           solubility.  Rapid downward movement and horizontal migration would
           only be suspected If  large quantities of oil-soluble solvents were
           allowed to  percolate  through the soil.

           The highest potential  for the downward migration appears to be 1n
           the seepage pit area,  where the excavated and caved area tends to
           funnel  precipitation.   Review of previous investigations indicates
           that unknown amounts of liquids were disposed of in this area of the
           site by dumping Into  the seepage pit.  The construction of this pit
          was such that liquids would seep out to the surrounding formations.
          Sources of  the liquids are not known but are suspected to Include
           some portions of the  liquids generated on site.  Unless large
          quantities of solvents were dumped into the excavated area,
          migration of PCB would not be expected to be significant.


VI.   Summary of Site  Risks

     Introduction

     The surface, subsurface, and deep soils at the NWT site were analyzed  for
     all or a subset of the following contaminants:  PCB, volatile organics,
     semi-volatile organics, polychlorinated dlbenzo-p-dioxins and
     dibenzofurans, and inorganics.  Groundwater samples were analyzed  for
     PCB,  volatile organics, and semi-volatile organics.

                                       15

-------
 The results  showed  PCB  contamination  in soils and in all five of the
 groundwater  wells on  site.  Because of the questionable quality of the
 data from the off-site  wells,  it  is not clear if they are contaminated
 with PCB.    Low  levels  of penta through octachlorinated dlbenzofurans
 and/or  dloxins were found in the  soil samples from the burn pit that were
 analyzed  for these  compounds.  Of the other organics (volatile and
 semi-volatile) analyzed for, acetone and methylene chloride were
 Identified at or just below the detection limit in some of the samples
 and blanks.  Inorganics in soil samples were at or below background
 levels  except for copper and lead, which were slightly elevated in two
 samples.

 A  risk  assessment was performed for PCB in soil  and groundwater and for
 chlorinated dioxins and furans in the burn pit samples.  Both acetone and
 methylene chloride  were present at very low levels in several of the
 off-site  groundwater samples and were likely found because of their use
 as  laboratory solvents.  For the  inorganics that were found at
 concentrations above background (lead and copper), only lead Is of
 concern to human health.  The maximum soil lead level (53 ppm (mg/kg))
 was  well  below the  level of concern for lead in soil.

 Toxicity of PCB and Polychlorinated Dlbenzofurans and Dibenzo-p-dioxins

 The  Arochlor oil used in transformers contains a mixture of PCB in
 various proportions.  The majority of the Arochlors found In the soil
 samples at the NWT  site was Arochlor 1260; the type of Arochlor present
 in  the water samples was not identified.

 Each PCB compound may exhibit its own toxlcological characteristics.  In
 general, however, PCB has been shown to produce a variety of non-cancer
 health effects in laboratory animals, including liver, thyroid, and
 reproductive toxicity.  Several studies have also shown that PCB causes
 cancer in laboratory animals.  The combination of the sufficient evidence
 from these animal studies and inadequate,  but suggestive, evidence from
 human studies leads to  a designation of PCB as a probable human
 carcinogen. Group B2, under EPA guidelines.   EPA has estimated an oral
 cancer potency value of 7.7 per mg/kg/day for Arochlor 1260 based upon a
 study by Norback and We Itman (For this and following references, see the
 revised Risk Assessment, which is part of the Administrative Record for
 the  site.) In which chronic dietary administration of Arochlor 1260 was
 shown to cause liver cancers In rats.  A separate cancer potency value
 for  Inhalation of PCB has not been developed by EPA.  For this risk
 assessment, the inhalation potency of PCB was assumed to be the same as
 the one calculated  for  the oral route.

Chlorinated dibenzo-p-dioxins and dlbenzofurans are structurally similar
 compounds.  They are not intentionally made for any commercial purpose,
 but rather are by-products created during the manufacture of other
 chemicals or as a result of incomplete combustion of materials containing
 chlorinated compounds,  such as PCB.  There are seventy-five different
 chlorinated dioxin  isomers and over one hundred furan  isomers.  The  toxic
 effects of these isomers can differ markedly depending upon  the location
 and number of chlorine  molecules.  The most toxic isomer,
 2,3,7,8-tetrachlorodibenzo-p-dioxin (2,3,7,8-TCDO), has been shown  to
 cause many different types of toxic effects in animals, including
 reproductive effects, thymic atrophy, and a "wasting syndrome"  leading  to
 death.

                                  16

-------
2,3,7,8-TCDD, as well as a mixture of two 2,3,7,8 hexachlorodibenzo-
p-dloxlns, have been shown to cause cancer in laboratory animals and are
among the most potent animal  carcinogens evaluated by EPA to date.
Available experimental data suggest that some of the other chlorinated
dioxins and furans may exhibit similar toxic effects.  The toxicity of
each chlorinated dioxin and furan is estimated relative to that of
2,3,7,8-TCDD by using a toxicity equivalence factor (TEF) approach
derived by EPA from comparisons with the in vitro tests.  With the  TEF
procedure 2,3,7,8 TCDD is always given a value of 1 and other chlorinated
dioxins and furans a value that is a fraction of this.

Baseline Risk Assessment for  PCB - Maximum Cancer Risk for an Individual

Estimates of risk from exposure to PCB in soil and groundwater were made
assuming the following exposure scenarios:

0    Residential  Scenario—The NWT site may sometime become a residential
     area.  Humans could be directly exposed to PCB in soils as a result
     of ingestlon and inhalation of contaminated soils, absorption  of PCB
     from soils onto skin surfaces (dermal  absorption), and Indirectly
     through the ingestlon of vegetables that are grown In contaminated
     soil.  In addition, it was assumed that PCB-contamlnated water from
     wells dug on the site would be used for drinking water.

•    Grazing Scenario—Since  the soils at and surrounding the site  are
     designated as prime farmland by the Soil Conservation Service, the
     NWT site may sometime become farmland used for cattle grazing.

     Residential  Scenario

     In this scenario, it was assumed that a person lives on the NWT site
     for an entire lifetime (70 years) and that:

     1.    Children (ages 0-5  years) Ingest 0.05 to 0.5 grams of soil per
          day as  a result of  hand-to-mouth activity.

     2.    Older children and  adults Ingest from 0.05 to 0.25 grams  of
          soil  per day.

     3.    Inhalation rate Is  20 m3/day for all age groups.

     4.    The concentration of dust In the air at the site is 50 ug/m^.

     5.    Skin contact with soil ranges from 0.1 g to 10 g per day for
          children,  and is 0.1 g per day for adults.

     6.    Soil  exposure occurs six months per year.

     7.    The absorption of PCB from soil in the gastrointestinal  (GI)
          tract is 30%;  through the lung, 507.; and through the skin,  17..

     8.    Children and adults ingest two liters of water per day;
          absorption of PCB in the GI tract is  100X.
                                  17

-------
9.   PCS uptake values [ug/g of PCBs In plant tissue (dry weight)
     per ug/g of PCBs in soil (dry weight)] for root crops,  garden
     fruits, and leafy vegetables were estimated to be 0.150,  0.007,
     and 0.013, respectively.  It was assumed that from 25X to 100%'
     of the vegetables consumed by a person are grown on the NWT
     site.

10.  PCS concentrations in soil and water will  remain the same over
     the next seventy years (i.e., no degradation in soil  occurs and
     no changes in groundwater concentrations occur).

These exposure parameters were selected from the literature  because
they appear to be the most reasonable and fairly conservative  and
because they give a range of exposure values with which to calculate
risk.  The final exposure parameters to be selected are the  PCB soil
and groundwater values.

     Direct Soil Contact:  Ingestlon, Inhalation, and Dermal
     Absorption

     For soils, the PCB concentrations In surface soil  samples were
     used since human exposure to surface soil  Is of greatest
     concern in the residential scenario.  Existing surface  soil
     values at the site range from below the detection limit of
     25 ppb (ug/kg) to 92 ppm (mg/kg).  Risk estimates were
     performed using the weighted average surface soil  concentration
     (6.6 ppm (mg/kg)) for the site as well as  the weighted  average
     soil concentration plus two standard deviations (36.9 ppm
     (mg/kg)) to account for the fact that some "hot spots"  of
     contamination are present.

     Using the average PCB soil concentration (6.6 ppm (mg/kg)) to
     calculate risk from Ingestlon, Inhalation  and dermal  absorption
     results in an estimated upper-bound lifetime cancer risk  of
     2  X 10-5 to 7 X 10-5 (2 chances In 100,000 to 7 chances in
     100.000).  Using the average soil value plus two standard
     deviations (36.9 ppm (mg/kg)) results in an estimated
     upper-bound lifetime cancer risk that is about five to six
     times higher,  or 1  X 10~4 to 4 X 10~4.

     Groundwater

     Three analyses of the five on-site monitoring wells have been
     performed.  Two of these (done In April 1985 and July  1987)
     used detection limits of 1.0 ug/1 and showed no contamination.
     The third analysis, done by EPA in May 1985, used a detection
     limit of 0.02 ug/1.  Contamination ranging from 0.03 ug/1  to
     0.12 ug/1 was found in all five wells.  The average value  of
     0.06 ug/1 and the maximum value of 0.12 ug/1 from the  May  1985
     analysis were used to estimate the upper-bound  lifetime risk of
     developing cancer from drinking on-site groundwater.   This
     resulted in risks of 1 X 10'5 and 3 X 10~5 for  the average
     and maximum values, respectively.
                             18

-------
Vegetables

To calculate exposure to PCB through ingestion of vegetables
grown on the NNT site, ft is necessary to have estimates  of  the
PCB concentrations expected In vegetables grown on the  site  and
estimates of the consumption rates of these vegetables.

     Estimates of PCB Concentrations in Vegetables

     To estimate the PCB concentrations In vegetables,  both
     published and unpublished literature of PCB uptake  into
     vegetables was reviewed.   The literature available  is very
     limited and uptake factors Cug/g of PCB in plant tissue
     (dry weight) per ug/g of  PCB in soil  (dry weight)]  for  a
     given vegetable varied greatly depending on several
     factors,  including the type and amount of PCB isomer
     present in the soil  and the type of soil.   When possible,
     the uptake factors used in the Risk Assessment were  those
     estimated from experiments where Arochlor 1260,
     Arochlor  1254, or highly  chlorinated Isomers were  present
     In the soil at levels ranging from a few parts per  million
     PCB up to about 100 ppm (mg/kg) PCB.   These experiments
     were chosen since they most closely represent conditions
     at the site [I.e., presence of highly chlorinated  PCB  In
     soils at  concentrations up to 92 ppm (mg/kg)].

     The uptake factors used in this risk assessment and  the
     information upon which they are based are summarized
     below.  More details  of these calculations are presented  in
     Appendix  1  of the revised Risk Assessment, which is
     included  in the Administrative Record for the site.

          Root Crops

          Data from Wallnofer, et al.  and Iwata, et al.  were
          used to estimate an  uptake factor for carrots  of
          0.30.   An uptake factor for radishes of 0.007  was
          also calculated from Wallnofer,  et al. and uptake
          factors of 0.002 and 0.008 for beets and turnips,
          respectively, were calculated from Sawhney and  Hankin.

          It was assumed  that  501 of the root crops consumed at
          the  site would  have  an uptake factor equal to that of
          carrots (0.30)  and 50% would have an uptake factor
          equal  to that of the average of the other three root
          crops  (0.006).   This resulted in a weighted average
          uptake factor for all root crops of 0.15. It was
          assumed that all  root crops are eaten unpeeled.

          Garden Fruits

          Garden fruits include such vegetables as beans, peas,
          eggplant, and tomatoes.  Only one reference  was
          found, that of Sawhney and Hankin, which contained
          information on any garden fruits (bean pods).  Use of
          this data resulted in a calculated uptake factor for
          garden fruits of 0.007.

                        19

-------
     Leafy Vegetables

     No data on PCB uptake Into lettuce, spinach,  and
     other commonly eaten leafy vegetables were found.
     However, data are available for beet greens and
     turnip greens; therefore, these data were used to
     calculate an uptake factor for the leafy vegetable
     group.  Using the data of Sawhney and Hankln  resulted
     1n an uptake factor of 0.004 for beet leaves  and
     uptake factors of 0.002 and 0.007 for turnip  leaves.
     The data of Strek, et al. resulted in a calculated
     uptake factor of 0.45 for beet tops.

     The uptake factor used for leafy vegetables (0.013)
     was estimated by calculating the geometric mean of
     the four values (0.004, 0.002. 0.007. 0.45) for beet
     greens and turnip greens.

     Potatoes

     Data provided by Lewis Naylor Indicated no detectable
     uptake of Arochlor 1254 when potatoes were grown on
     soils containing from 0.08 to 1.3 ppm (mg/kg)
     Arochlor 1254.  Therefore, an uptake factor of 0 was
     assumed for potatoes.

Vegetable Consumption Rates

Consumption rates for leafy vegetables, garden fruits,  and
root vegetables were calculated using data presented in
"Methodology for the Assessment of Health Risks Associated
with Multiple Pathway Exposure to Municipal Haste
Combustor Emissions" (October 1986.  EPA, external
draft).  In this document, consumption rates for various
food groups (In grams per day, dry weight) are presented
by sex and for certain age groupings.  These consumption
rates are based on a reanalysls of data compiled In  the
FDA Total Diet Study.

For this Risk Assessment, the consumption rates In the EPA
document were adjusted to provide consumption rates  for
three age ranges covering 0-70 years of age:

1.   A 0-11 month old child (based upon  the consumption
     rate for a 6-11 month-old given  in  the EPA document).

2.   An 11 month - 5 year-old child  (based  upon the
     consumption rate for a 2 year-old given  in the
     document).

3.   Older children and adults, from  5-70 years of  age
     (based upon the average of all  the  consumption  rates
     (male and female) for a  14-65 year-old given  in the
     document).

                   20

-------
           Estimation of  Increased Cancer Risk from Consumption of
           Vegetables

           To  estimate  the  risk from  ingesting vegetables grown at
           the NWT  site,  two different scenarios were used.  In the
           first, it was  assumed that 100% of the vegetables consumed
           by  a person  were grown on  the site; in the second, it was
           assumed  that 25% of the person's vegetables were grown on
           the site.

           Using  the average PCS soil concentration (6.6 ppm (mg/kg))
           to  calculate risk from vegetables results in an estimated
           upper-bound  lifetime cancer risk of 2 X 10-5 (assuming
           25% of vegetables are grown on site) to 9 X 10~5
           (assuming 1007. of the vegetables are grown on site).
           Using  the average soil value plus two standard deviations
           (36.9  ppm (mg/kg)) results In an estimated upper-bound
           lifetime cancer  risk of 1 X 10~4 (1f 25% of vegetables
           are grown on site) to 5 X  10~4 (1f 100% of vegetables
           are grown on site).

     Risk  from all Exposure Routes for the Residential Scenario

     The Increased chance of developing cancer from the three routes
     of exposure to PCB  in the residential exposure scenario can be
     obtained by adding  the risks from direct contact to soils, from
     drinking water consumption, and from vegetable consumption (see
     Table 7).  Using  the average soil PCB concentration on site
     (6.6  ppm (mg/kg)) results in estimated risks ranging from
     5 X 10~5 (using the less conservative Ingestlon and skin
     absorption factors, assuming 25% of vegetables consumed are
     grown on site, and  using the average groundwater
     concentrations) to  2 X 10~4 (using the more conservative
     Ingestion and skin  absorption factors, assuming 100% of
     vegetables consumed are grown on site and using the highest
     groundwater concentration).

     Using the higher  soil PCB concentration (36.9 ppm (mg/kg),
     average  plus  two  standard deviations) results in risks ranging
     from  2 X 10~4 (using  the less conservative values) to
     9 X 10~4 (using the more conservative values).

Grazing Scenario

In this scenario,  it is  assumed that the NWT site is converted  to
agricultural  land  that is used for beef and dairy cattle grazing.
PCB can be ingested by cattle because they consume soil during
foraging (about 0.72 kg  of soil/day).  Therefore, if soil  is
contaminated,  beef and milk can also become contaminated.

To estimate the  risk from  ingesting  beef and dairy products from
cattle raised on the NWT site, two different scenarios were used.
In the first,  it was assumed that 100% of the beef and milk products
consumed by a person are from cattle raised at the site;  in the
second, it was assumed that 25% of their beef and milk products  come

                             21

-------
           from  cattle  raised at  the  site.  It was also assumed that the
           average  soil  value of  6.6  ppm (mg/kg)  Is  the most appropriate to use
           for livestock grazing.

           Uptake studies of PCS  by cattle are not available; therefore, data
           on polybrominated blphenyls (PBBs) were used.  Fries and Jacobs
           conducted  studies In which cattle were kept 1n an area where soils
           were  contaminated with PBBs.  Under these conditions, the beef
           fat/soil ratio was 0.39 and the milk fat/soil ratio was 0.40.  An
           assumption was made that the same fat/soil ratios exist for PCS.

           In Schaum, the following table is given:

                     Total Consumption     Percentage    Fat Consumption
                     Rate (g/person-day)   Fat           Rate (g/person-day)

           Beef              124                15              19
           Dairy Products    550                 7.8            43
          Using these data, the cancer risk for a person who obtains all his
          beef and dai
          to be 1 X  10
beef and dairy products from cattle grazing on the site is estimated
            i~fc
          The cancer risk for a person who obtains 251 of his beef and dairy
          products from cattle grazing at the site is estimated to be
          2.5 X 10-3.

     Uncertainties in Risk Assessment Estimates

     Many uncertainties exist and several conservative assumptions were used
     in generating the risk estimates just discussed.  For example, the
     exposure scenarios presented are conservative ones and represent
     reasonable worst cases; yet they could potentially occur If the site 1s
     converted to residential or agricultural land.  Several of the exposure
     parameters used (e.g., soil Ingestlon and dermal contact rates, vegetable
     uptake factors, uptake of PCB Into cattle) are estimates and may be
     higher than actually would occur.  Finally, the cancer potency value for
     PCB Is based upon oral studies in animals at high concentrations and must
     be extrapolated to humans.

     Therefore, these cancer risk numbers should not be considered precise
     numbers but rather conservative estimates that err on the side of
     safety.  The actual risks due to potential future exposure at the site
     are unlikely to be higher than those presented here and could well be
     much lower; however, because PCB Is a probable human carcinogen, it  is
     prudent to use conservative estimates of risk in deciding what remedial
     action may be needed at the NUT site.


VII.  Documentation of Significant Changes

     The FS and the Proposed Plan recommended thermal destruction of PCB  in
PCB-contamlnated soils with concentrations at or above 10 ppm (mg/kg).
                                       22

-------
                                       Table 2
                          Baseline Bisk Assessment  for  PCBs1

                                 Residential  Scenario
PCB Soil
LCYtlS
Estimated Upper-Bound
Lifetime Cancer Risks
Consumption


6.6 ppm2
36.9 ppm3
Direct Soil
Contact
2-7 X ID'5
1-4 X 10"4
Of
Homegrown
Vegetables
2-9
1-5
X 10*s
X 10**
Drinking
Water
1-3 X lO'5
1-3 X 1
-------
 Thermal destruction  technologies  include  incineration and vitrification, as   •
 well as the  thermal-based  processes such  as catalytic combustion and infrared
 destruction.  Upon further  review and cost analysis by EPA and further review
 of documentation of  demonstrations of the vitrification technology, the best
 thermal destruction  process for this site was determined to be vitrification.
 This determination was made based on 1) relative ease and foreseen schedule of
 mobrlization, 2> advantageous costs over other thermal processes as reflected
 in the FS, 3) acceptability of the vitrified mass as an on-site residue over
 other conventional materials classified as ash, 4) the foreseen local
 acceptance of contained, "in-the-ground"  thermal destruction of PCB
 contaminants over conventional incinerator operations, and 5) the criteria set
 forth for technology selection in the FS.

     In addition, EPA has been provided with an updated cost for ISV for
 smaller scale applications  ($250-$330/ton versus $180/ton).  One unknown
 regarding ISV Is the availability and cost of the appropriate high-voltage
 electrical service.  EPA has been advised that In regions where electrical
 service is Insufficient to accommodate the system, a mobile substation can be
 provided.   This additional power source represents a ten to twelve percent
 increase in the project cost, yielding a minimum small-scale cost range of
 approximately $275-$350/ton.  The cost of this technology Is still within the
 range of costs cited In the Proposed Plan under thermal  destruction.


VIII. Description of Alternatives

     For this operable unit, remedial  action technologies have been
 specifically evaluated and selected for application to the surface soil
contamination and associated exposure/migration routes.   During the initial
stage of the FS process, a broad range of possible treatment/disposal
technologies were identified and evaluated.  Several alternatives were found
 to be acceptable In terms of the primary screening criteria used.  These
alternatives included the following:

          Off-site landfill

          Off-site Incineration

     0     On-s1te thermal destruction

     0     On-site soil  washing

     0     On-site Immobilization

     8     On-site thermal stripping

     0     On-site dechlorination by potassium hydroxide and polyethylene
          glycols (KPEG)

     0     In situ vitrification

          In situ immobilization

     0     Capping

          Cover
                                       24

-------
     Secondary screening of these technologies in terms of feasibility,
environmental and public health concerns, and costs reduced the number of
technologies to five.  These five technologies were then assembled to develop
the alternatives described below.

     The estimated volume of soil contaminated with PCS at a concentration
greater than or equal to 10 ppm (mg/kg) is approximately 1200 cubic yards.
This volume estimate is based on a 25 X 25 foot soil sampling grid utilized
for RI sampling and an assumption that the concentration of PCS decreases
linearly In the soil with depth.

     All alternatives (except the no action alternative) will  include
abandonment of the one on-site well  In accordance with state law.   In
addition,  a groundwater monitoring program and sampling of the deeper wood
matrix of the barn timbers will  be included as a part of the remedial action
for the site.
   t
     Alternative 1:   Off-Site Management

     This  alternative Includes the excavation of PCB-contamlnated  soil with  a
     concentration greater than  or equal  to 10 ppm,  transport to a
     TSCA-approved chemical  waste landfill for disposal, and backfilling of
     the excavated area,  to grade.  In addition,  a two-foot soil  cover would
     be applied and  hydroseeded  for  stabilization.

     The Implementation of this  alternative Is relatively straightforward with
     the soils  being transported in  truckloads of approximately 10 cu yd per
     load.

     This  alternative would  meet all  Applicable,  Relevant,  and Appropriate
     Requirements  (ARARs) including  the "to be considered"  requirements  by
     removing the  soils with a PCS concentration  greater than or  equal to 10
     ppm from the  site.   The risk due to exposure to the residual
     contamination (soils with PCS concentrations less than 10 ppm (mg/kg)>
     would  be significantly  reduced  with the placement of the two-foot clean
     soil  cover.

     Covers  less  than two feet In depth are not considered  adequate for  future
     use of  the site (I.e.,  crop growth or cattle grazing)  and would be  used
     only with  conditions/restrictions placed on  future property use.  The
     two-foot depth  limit 1s derived  from recommended tilling depths for
     common  root crops.

     Alternative 2:   Vitrification

     Vitrification Is a thermal  destruction/stabilization process  that
     converts contaminated soil  into  a chemically inert, stable glass and
     crystalline product.   Four  electrodes are placed in a  square  arrangement
     and inserted  into the ground to  the desired  treatment  depth (see Figure
     3).  Because  the soil  is  not electrically conductive,  a mixture of flaked
     graphite and  glass  frit is  placed among the  electrodes to act as a
     starter  path.   An electrical  potential  is applied to the electrodes,
     which establishes an electrical  current in the  start path.  The resultant
     power heats the starter path and surrounding soil to 3600° F, well  above
     the initial melting  temperature  or fusion temperature  of soil (2000° and

                                       25

-------
                                           Support Trailer
                                               x. Electrical System
                                                      Glycol Cooling System
     Control Trailer
           .-•\"*
  S" Site to Be
"XT'- Vitrified
v:
                                            Electrode'
                                         Off-Gas Hood
                                         Cover
                                                                            HEPA Filter
                                                                            Housing
Figure 3
                                In  Situ Vitrification
                                                 26

-------
 2500*).   The graphite  starter path  is  eventually  consumed  by oxidation,
 and the  current Is  transferred to the  molten  soil,  which  is now
 electrically conductive.   As  the  vitrified  zone grows,  it  Incorporates
 nonvolatile  elements and  destroys organic components  (PCB) by  pyrolysis.
 The pyrolyzed by-products  migrate to  the surface  of the vitrified  zone,
 where  they combust  in  the  presence  of  oxygen.  A  hood  placed over  the
 processing area provides  collection of the  combustion  gases, which are
 drawn  off to the off-gas  treatment  system.

 Because  the  depth of contamination  in  the soil at NWT  is  relatively
 shallow,  use of the vitrification process would require staging the
 contaminated soil to a  trench or  stockpiling  It above  ground in order to
 achieve  a more  appropriate  process  depth.   A  typical  configuration for
 treatment is a  20 to 25 foot  square,  10 to  15 feet  deep.   The  soil at the
 site would have to be  placed  in such a configuration  in order  to make the
 use of vitrification cost  effective.

 The soil  characteristics at the NWT site are  compatible with use of  this
 technology.   The  gravelly  and sandy soil do not Interfere  with the
 process;  however, moisture  content  of  the soil could  cause additional
 costs.

 Prior  to  the implementation of this technology, a site-specific
 treatability test would be  required to:

     1.    Obtain  confirmation that  ISV is technically  applicable to  the
           PCB-contamlnated  soils  at the site.

     2.    Confirm that the  treatment levels required  (I.e. a residual
           product that contains less than 1 ppm PCB)  can be obtained.

     3.    Determine any technical factors that may  cause  the cost of
           remedial operations to  vary  from  the FS estimates.

This alternative would meet all ARARs  (Including  the  "to be considered"
requirements) by destroying the PCB contamination in  the  treated soils,
such that  the concentration of PCB  In  the residual  remaining after
treatment  is  less than 1 ppm.

The risk due  to exposure to the residual contamination  (soils  with PCB
concentration less than 10  ppm (mg/kg)) would be  significantly reduced
with the placement of the  two-foot  clean soil cover.

The vitrified mass would be left  on site once it  was  determined to
contain less  than 1  ppm of  PCB.   It is  estimated  that  the  remaining
vitrified mass would occupy approximately one-sixth of an  acre.

Alternative  3:  Soil Hashing

Soil washing  Involves the on-site excavation  and  extraction of organic
contaminants  (PCB) by contacting  soil  particles with  a solvent.  The
solvent is then separated from the  soil and the solute is  concentrated  by
distillation or other processes.  The  solvent may then be  recycled  to  the
extraction process,  and the washed  soil is  returned  to the site.   The

                                  27

-------
 only type  of solvents  that  would be appropriate for use at  the NWT  site
 are chemicals  that  are proven  not  to pose a  public health or
 environmental  hazard due  to the high level of  the groundwater table.  The
 concentrated solutes and/or unrecycled contaminated solvent must be
 handled  as  hazardous waste  after treatment is  completed.  Typically,  the
•PCB residues from pilot tests  exceed 500 ppm (mg/1) and must, therefore,
 be  incinerated or further treated  to destroy the PCB residues.  These
 final  treatment  technologies include hydrolysis, ultraflltration. reverse
 osmosis, carbon  adsorption,  dechlorinatlon,  and the light-activated
 reduction  (LARC)  process.

 The majority of  the techniques for soil washing are in the pilot research
 phase, yet  preliminary field work  Indicates  that soil washing may be a
 feasible alternative for  the NWT site.  The  EPA high pressure soil
 washing  technique, using only  water and surfactants as solvents, would
 significantly  reduce the volume of leachate  that would require further
 treatment.   Another advantage  is that this method does not  Introduce
 additional  chemicals into the  site soil.

 Prior  to Implementation of  this technology,  a  site-specific treatability
 test would  be  required to:

     1.   Determine whether  soil washing is  technically applicable  to the
          PCB-contaminated  soils at the site.

     2.   Confirm that the  treatment levels  required can be obtained.

     3.   Determine any technical factors that may cause the cost of
          remedial operations  to vary from FS  estimates.

     4.   Determine which leachate treatment technology would be most
          applicable.

 This alternative  would meet all ARARs (Including the "to be considered"
 requirements)  by  removing the  PCB contamlnaton from the treated soils to
 a concentration of less than 2 ppm.

 The risk due to exposure to the residual contamination (soils with  PCB
 concentration  less than 10  ppm (mg/kg)> would  be significantly reduced
 with the placement of  the two-foot clean soil  cover.

Alternative 4:  Asphalt Cap

 The surface  sealing technique of using asphalt as a capping material  is
an effective measure for reducing or limiting  the exposure  pathways of
direct contact, windblown dust, and surface  water transport.  Although
 the contaminant remains in  place,  it is confined from wind  and surface
water.

However,  to be effective as a  long-term remedial action measure,  the
asphalt cap must  be periodically maintained.   The design must also  take
 Into account measures  for controlling increased or redirected storm water
runoff.
                                  28

-------
 Use of an asphalt cap at the  site  is  considered  only  as  a  stand-alone
 alternative.   The other alternatives  (I.e.,  soil  removal and/or
 treatment/disposal)  will  be  sufficient  to  eliminate requirements for a
 subsequent cap.   Therefore capping was  not considered as a  supplementary
 technology In  the development of the  other remedial alternatives.

 Control of future land use is viewed  as  a  supplemental requirement where
 capping  is implemented in order  to assure  future  integrity  of  the cap
 structure.

 Surface  sealing  with  an asphalt  cap will provide  protection against
 direct contact with  contaminated materials  and the migration of
 subsurface contamination; however,  this  technology will  not meet the
 ARARs  (TSCA 761.60-761.79) without  redesignatlng  this site  as  a TSCA
 landfill,  and, therefore, restricting land  use in perpetuity.

 This alternative  would not meet  the "to  be  considered" requirements
 because  it would  not  meet the cleanup goal  (TSCA  spill cleanup policy) of
 removing  soils contaminated with PCB at  a  concentration  greater than or
 equal  to  10 ppm.

 Alternative 5:  Soil  Cover

 This alternative  Includes the application of a soil cover without
 previous  excavation or treatment of contaminated materials.

 For this  site, covers.  In contrast  to caps, are not designed to
 significantly decrease infiltration Into the underlying  strata.  A cover
 at  this site will decrease the potential for direct contact and/or
 physical  dispersal of surface soil   only.   Its performance would be
 attributed  to short-term  (10-15  years) .Isolation of underlying
 contaminated soil.  For  this  reason, a cover at this  site has  been viewed
 as  a complementary technology, used as a final measure In addition to
 other  cleanup processes.

 A soil  cover of two-foot  thickness  provides some  level of protection for
 the environment In that direct contact and surface erosion/ transport are
 controlled.  However,  application of a soil cover alone  (without prior
 cleanup) does not meet the cleanup  goal  of  10 ppm (mg/kg);  nor does it
meet the designated ARARs for the site without redesignating the site as
a TSCA landfill.

Alternative 6:  No Action

 This alternative must  be  considered as a viable option when the existing
and future  risks attributable  to the site are within  acceptable ranges.
The "no action" alternative infers  that  the status quo conditions at the
 site will  be allowed  to persist  and that remedial actions  to protect
human health and the  environment are unwarranted.

No action at the NWT  site constitutes on-site (and uncontrolled) disposal
of PCB-contaminated wastes and does not meet the designated ARARs for  the
 site.
                                  29

-------
IX. Summary of the Comparative  Analysis of Alternatives

     For the five finalists,  the  following nine criteria, as outlined in
section 121 of SARA and the RI/FS guidance, were explored during the final
analysis of remedial  alternatives:

     Short- and Long-term Effectiveness

     Each remedial  alternative  considered during the FS process represents
     some identifiable  risk to  community health and safety during the
     implementation stages.   However, for most processes, these risks can be
     identified and mitigated through proper process control, monitoring, and
     execution.

     During removal  of  soil to  an off-site facility (Alternative 1), some
     potential  exists for distribution of contaminated soil from trucks and
   .  other equipment  passing  through the adjacent community.  This can be
     mitigated  by covering the  soil  loads and, If necessary, applying moisture
     to dry,  dusty loads.  The  short-term threat due to fugitive dusts
     generated  during excavation  could be mitigated, if necessary, by applying
     moisture.

     On-slte  vitrification (Alternative 2) may create air emissions, but
     effective  and  reliable technologies have been developed for capturing
     and/or destroying  contaminants  in this process.  As there would be some
     excavation  required  during the  implementation of this remediation
     technique,  mitigation of fugitive dusts generated would be required.

     Soil  washing (Alternative  3) does not present any measurable risk to the
     community.   The only exception would be the release of extractants or PCS
     while mixing the soil during the extraction process.  The process also
     generates  a PCB  concentrate  that must be transported off site and
     disposed of.   Again,  there would be some excavation required during the
     implementation of  this remediation technique, and mitigation of fugitive
     dusts  generated would be required.

     Capping or  application of  a  soil cover at the NWT site (Alternatives 4
     and  5) do not  pose any unique short-term risk to the adjacent community
     beyond those Inherent In any construction activity.  The only exception
     would  be accidental  tracking of contaminated soils off site by heavy
     equipment.   However,  this  risk  is common to all the alternatives
     discussed above and  can  be reduced by proper project management and
     equipment decontamination  protocols prior to exiting the site.

     The  long-term  effectiveness  and risk reduction for the six alternatives
     is estimated to be highest for  those that actually treat and/or destroy
     PCB  contaminants in  the  soil (i.e., vitrification and soil washing).
     While off-site disposal  of soils in a landfill also reduces the on-site
     concentrations of  PCB, it  potentially transfers the contaminant problem
     to another  land-based facility.  Further, off-site transportation and
     disposal of hazardous substances without treatment should be  the  least
     favored alternative  where  practicable treatment technologies  are
     available  CCERCLA  §121(b)].  Caps must rely on land-use restrictions,
     regular  inspections,  and scheduled maintenance to assure their  long-term
     performance.   Installation of a cap or soil cover is not a permanent

                                      30

-------
 solution and  would  require  regular maintenance.

 Reduction of  Toxlclty.  Mobility,  and Volume

 Landfllling of  soils  off  site does nothing to physically destroy or treat
 PCB-contaminated  soils  from the  site.   In contrast, vitrification
 effectively destroys  the  contaminants  in the soil matrix and thereby
 permanently reduces toxlcity, mobility, and volume.  Soil washing removes
 the  contaminants  from the soil matrix;  however,  this technology may
 introduce new problems  because residual washing  agents may still be
 present  in the  treated  soil  to be redeposited on the site, and the
 concentrated  PCS  extracts require subsequent treatment or disposal.
 Installation  of a cap or  soil cover does nothing to address the volume or
 toxicity of the contaminant  but  has the potential of reducing contaminant
 mobility.

 Implementability

 All  of the finalist alternatives are technically feasible methods for
 addressing the  PCS contamination at the site.  Alternative 1 (off-site
 landfllling)  is probably  the most commonly practiced method of disposal
 but  does  not  result In  actual detoxification or  destruction of the PCS.
 Also, landfllling of  PCB-contaminated  soils 1s more commonly practiced
 for  highly contaminated materials (above 50 ppm  (mg/kg» when on-slte
 options  are not as feasible.

 Alternative 2 (In situ  vitrification)  has been successfully used in
 engineering-scale studies involving PCB-contaminated soil; however, it
 has  not yet been  demonstrated commercially.  A site-specific treatability
 test would  be required  prior to  implementation of this technology as a
 remedial  action.

 Alternative 3 (soil washing) would also require  site-specific
 treatability  testing  of soil from the  site to evaluate its
 effectiveness.  In addition, the concentrated process waste (leachate
 contaminated with PCB)  would still require off-site treatment/disposal.

 During the course of  the FS, a number  of surface-sealing methods (capping
 and  soil  covers)  were evaluated.   The  use of an  asphalt cap was finally
 selected  as the most  cost-effective capping method for further
 consideration as  Alternative 4.  The Installation of an asphalt cap is
 straightforward;  however, the long-term effectiveness can only be assured
 through routine monitoring and maintenance of the paved surface.  Because
 the  subsurface  soils  would not be treated or altered, the site would
 require classification  as a  TSCA landfill.

Alternative 6,  the "no  action" alternative, is included in the FS to
 assess the current site status.  It serves as a  reference point for
measuring  the relative  effectiveness of other alternatives and
determining if cleanup  is necessary.   If accepted, the no-action
alternative would leave the  site as it  is,  with  no constraints on
 continued exposure to hazardous materials for those who enter  the  site
and with  possible migration of contaminants into the shallow potable
 water aquifer.  It was  determined that  this alternative is unacceptable
 because the environmental and public health risks would not be reduced.

                                  31

-------
     Cost

     The cost estimates for each process  for  cleaning  up  or  capping
     RGB-contaminated soil  to the 10 ppm  (mg/kg)  level  are  shown  in  Table  3.
     The cost elements considered and included  as  applicable for  each  of  the
   . assessed technologies  include the  following:

               Treatabllity testing (where  applicable)

          0    Mobilization/demobilization

          0    Confirmatory testing

          0    Excavation/soil  staging

          0    Processing (Including utilities, chemicals,  labor,  etc.)

          0    Construction materials

               Backf111

     The no-action alternative  has only those  Implementation costs common  to
all  alternatives.  I.e.,  the cost of the five-year  review  required  by CERCLA,
but  the cost of environmental degradation was  not  assessed.

     Compliance with Other  Laws and Regulations

     As part of the FS process, each alternative was evaluated  to determine
     whether or not It met  ARARs.   The  chemical-specific  requirement for  this
     analysis Is TSCA,  specifically,  TSCA 40 CFR 761.60-761.79, Subpart D:
     Storage and Disposal.

     This regulation states that PCB at concentrations  greater  than  or equal
     to 50 ppm must be disposed of In an  incinerator which  complies  with
     §  761.70.   However,  the regulation goes on to state  that non-liquid
     PCB-contaminated  materials, such as  soil,  can be  treated by  an  alternate
     methodology as described  In § 761.60(e) or disposed  of In  a  chemical
     waste landfill that  compiles  with  §  761.75.   In order  .to meet the
     requirement that  an  alternate methodology  be  equivalent to thermal
     treatment,  a  destruction removal of  99.99991  should  be achieved.
     However,  other factors may have to be  considered  In  the determination of
     equivalency.   For example, the mathematically calculated PCB destruction
     efficiency of a process may be less  than  99.9999% due  to the analytical
     Limit of Quantification 
-------
TABLE 3:  SUKMARY OF ESTIMATED COMPARATIVE COSTS FOR EACH ALTERNATIVE
II
II
II
II
IP
IP
II
II
II
II



i
2A
19
3
4
5
6
II
II
ALTERNATIVE ||
OFF-SITE NCT/LANDFILL ||
THERMAL OBSTRUCT.: ISV ||
THERMAL DESTRUC: INCIN. | |
SOIL UASHING ||
ASPHALT CAP ||
SOIL COVER ||
NO ACTION ||


0.5
$101
8287
8448
8302
836
819
80
TOTAL COST
EXCAVATION
1
8177
8448
$641
$504
$36
$19
$0
($ X 1,000)
DEPTH (FT)
1.5
$254
8610
8833
8707
837
819
80
••*«««••••••
AT:

2
8330
8771
81,026
8909
837
819
80


2.5
8407
$933
$1,219
$1,111
837
819
80


3
8483
81,094
$1.412
$1,313
838
$19
80
II
II
II
II
II
II
II
II
II
II
(•ssuwt contMirutad «r«« of 16,875 squirt  f««t)
                                          33

-------
 However, the  state of Washington Dangerous Waste Regulations (WAC
 173-303) require various analytical results depending on the sampling/
 analytical procedures used.  The most stringent requirement is 1  ppm PCS
 for treated material; therefore that is the standard that must be met for
 the treated soils at this site.

 The NWT site  is classified as a non-restricted acc.ess area (i.e.,
 residential area).  Even though it is surrounded by a chain-1ink'fence,
 it is considered to be a non-restricted access area due to its close
 proximity (less than .1 km) to a residential area.  Based on this
 non-restricted access classification and the PCS concentrations in the
 soil, the TSCA spill cleanup policy (40 CFR 761.120, Subpart G) requires
 a 10 ppm (mg/kg) cleanup level (provided that soil is excavated to a
 minimum depth of 10 inches) In addition to at least ten Inches of clean
 backfill (i.e., soil with less than 1 ppm PCB) for this site.

 Alternatives  1, 2. and 3 (landfill Ing,  vitrification, or washing of
 PCB-contaminated soils) are all estimated to meet the requirements and
 limitations of both the TSCA regulation and spill cleanup policy.
 Capping and covering of the site without Initial cleanup to 10 ppm
 (mg/kg) does not meet the Intent of the TSCA spill cleanup policy and
 would have to meet the design requirements for on-slte disposal of wastes
 as specified under TSCA.

Overall Protection

All  of the finalist cleanup alternatives (except the no action
alternative) will  afford an enhanced level of environmental protection in
 the vicinity of the site.  As Indicated in the discussion of public
health below,  each alternative would protect the environment by removing,
destroying, or isolating PCB compounds  In the soil.  The candidate
measures will  reduce the potential  for  these compounds to migrate off
site via windblown dust or storm water  runoff.

Excavation of soils and hauling to an off-site landfill (Alternative 1)
will  protect the environment In the vicinity of the site, but will
increase the risk to the environment along the haul routes to the distant
 landfill and at the landfill.

Vitrification  (Alternative 2) will  result In the destruction of PCB  in
the  soils  and  therefore provides the most permanent solution to the  PCB
contamination  problem.   Destruction of  PCB In the vitrified mass would
permit future  unrestricted land use at  the site, and potentially the site
could be used  as farmland or for residential purposes.  Although there is
a small  potential  for airborne release  from the ISV process, emissions
can  be effectively controlled and are not viewed as a significant
environmental  risk for this technology.

Soil  washing (Alternative 3) requires direct mixing of the soil with an
extracting liquid.   The concentrated waste extract must be transported
and  disposed of off site.  Similar to the landfill alternative,  this
alternative would reduce the risk in the vicinity of the site, but  has
the  potential  to increase the risk with respect to the ultimate
placement/disposal  of the contaminated  extract.


                                  34

-------
 The  capping  and  cover processes  represented by Alternatives 4 and 5 do
 not  address  contaminants  that  remain  in the soil and would require
 designating  the  site as a  TSCA  landfill facility.  Environmental and
 public health protection  is  contingent upon long-term maintenance of the
 capping  system,  and land  use restrictions would need to be imposed in
 perpetuity.

 The  no-action alternative  represents  no enhanced level of public health
 or environmental protection over current site conditions.

 Public health risks from  the NNT site arise from the following:

      1.   Potential contact, ingestion, or inhalation of PCB-contaminated
          soil.

      2.   Potential agricultural activities (growth of vegetables or
          dairy  and beef cattle grazing) associated with the soil that
          might  result In  Ingestion of accumulated PCS.

      3.   Contamination of shallow groundwater resources.

 In order to assess the effectiveness of each cleanup alternative, each Is
 evaluated In terms of the  "residual" risk at the site after the cleanup
 is finished.  This is done by examining the mitigating effect each
 cleanup alternative would have on the pathways listed above and by
 examining the impact of the degree of cleanup achieved (I.e., the
 residual  PCS concentrations).

 The highest degree of risk mitigation (the lowest final risk levels) is
 achieved through surface sealing (I.e., a barrier technology such as a
 cap or cover), since all potential risks posed by contaminated surface
 soils are eliminated.   However, the long-term effectiveness of these
 measures  Is highly dependent on regular Inspection and maintenance, as
 well  as strict limits on future land use.   All other processes that treat
 or dispose of contaminated soils also achieve risk reduction, but since
 some  residual Is left In the soils, there is still  a residual risk
 level.  This was the key reason for selecting the best treatment/disposal
 technology and combining it with a final soil cover.  The resulting
 preferred alternative achieves both the soil cleanup objectives (removing
or treating soil contaminated with more than 10 ppm (mg/kg) PCB) and
 reduction of the potential for direct contact with residual PCB levels
 (below 10 ppm (mg/kg)) by covering with clean soil.
                                  35

-------
                            Summary of Evaluation  ai  Final  Alternatives
Criteria

Short-ten
Effectiveness
Alt 1:
Landfill

Coiiunity arc
*er«:er exposure
Alt 2:
Vitrification

Potential exists
to for community ano
Alt 3:
Sc:l Xasning

Potential exposure
:o ?C3 dust during
Alt 4:
Asphalt Cap

The :ap :ouid be
i-staiied in 4-6
Alt 5:
Soil Cover

A 2 ft. son cover
•ould Deduce
Alt 6:
No Action

Evolves
continuation :•
           sccur
                PCBs  via  airborne  worker exposure
                                   during excmtisn.
                                   Excavation »ouio
                                   take approx. 2
                                   neeks.  The
                                   potential for
dust could
curing the
excavation and
hauling pnase.
Estimated
potential for PCB
exposure due to
airborne sust ;s
                   process off-gases
                   to escape from :.~e
                   air enissions ":cd
less than a icnth.  exists.
excavation exists.  *eeks.   However,
 In addition,  the  'is* is cose-: ;y
potential -cr       fugitive dust
mractints to be  generated during
released into  the  the grading
rvironment during  process.
the «:.-,.i-; pnase
?-ists.  sod
•asning process
•;.3S 4-12 mo.
a direct contact
  *ith the
  contaminated soil.
 .  The import and
  grading of the
  cover may generate
  fugitive dust.
  Takes approx. 4-6
  weeks.
the status quo
conditions at the
site.
.ong-term
Effectiveness
and Fsrmanance










Reduces the Effectively
mobility and destroys 5C?
volume of contamination n
contaminants in the soil tnrcugh
t.ie site soil. pyrolysis.
nunc.fr . > t does
not offer a
permanent solution
to the
contamination
problem, only
transfers it to
another location.
So;. *as;u ng Kith
•ater is reported
t3 "i a reliable
method for
'amoving ?CB
:ontafinants from
tre sail. Process
say not completely
'amove PCBs from
the soil. Thus, a
potential threat
to groundvater may
still exist.
"he surface rap is
not a pens- sat
alternative
because its'
effectiveness is
highly dependent
on regular
inspection and
maintenance.




Long-term Involves
reliability is continuation of
questionable due status quo.
to the potential
for erosion and
uncontrolled
infiltration of
surface «ater.





Deduction of    Does not destroy   Vitrification  is  a   ::.'.  •is^.ig
":x;c:ty,       or treat PCB       thermal :estruct::r  -emc.es
*obil;ty, and   contaminants. The  ;':c*ss t.iat         i;;r:-:iately  "M   and  aces  '.ot
volume          naste is simply    converts             :»  :-I:  '5=::ues     trsat,  sestrc»  ;r
                :*ans?crted to     :onta«inated  soil    •*:*  :reitsa        -eouce  tne
                another Lccatian.  into a cnemicalir    ie::«.   5s«-:vea     ;:r.tamiratec  soil.
                                   inert, stasla  ;lai=  -=3::aJ5 «:ula
                                   and c"ystall:"r      ~?ec  'jrt'-er
                                   product.             featia-'". jisoosal
                                                          This is not a      5ee ilternat;/e 4  :.ivol/es the
                                                          permanent met"oa                      continuation :;
                                                                                                ••9 status q-u.
                                                                                                3ee alternative  •
                                                    36

-------
                                            Suwary of Evaluation of Final  Alternatives

Criteria

>3le»entabie








::st







Operation and
*a:--reiance

Alt 1:
Landfill
•
This is a reliable
and effective
approach to
cleaning up the
site. Process
utilizes coiion

construction
letnoos.
»330,000 "otal
cast indices
oh-site
excavation,
hauling and
disposal costs.


None


Alt 2:
Vitrification

Prccass lachinery
requires
iobihration.
"reatabiltty test
;s requires.




$771,000 Cost
includes
fobilizaticn ana
deiobil; ration,
sampling ana
treatability tsst,
soil ex:avati;n a.ifl
soil treattent.
None


Alt !: flit 4: Alt 5: i't i:
Soil taj-iing Asa-iait Cap Soil Cover NO Action

rrccess is in Technical See alternative * "echnica;
pilot testing »'easibility of 'easibiitty :
stage. npieienting this high, but it
T-»atabi;ity test alternative is not »eet the
15 'sau.refl. high. Process cleanup joais
.i'llires coiion agency "'S'ec'

construction • c; acequate s
lethods. control.
1909,000 Does i:t 137,000 119,000 . Mo capital
nclude tne expenditure,
necessary C ard *. cost of
c:sts. environiental
dsgraaation «
not assesses.


No :r,Toriati:r 11,600/per year 12,000/per year None
Currently
available.



4
3
ioes

2^
; VPC
• » C 3
ite
c
u
but


ias



•i


Iciciiance  «ith  Co»plies «ith TSCA S« Alternative
ASAS'S          requireifftt 40 CFR
                761.60-761.79,
                Sjopart 0: Storage
                and
See H.te-native 1   Coes  not  ieet  "3Cfi  See Alternative *  See alter-ative
                   •9Quire«ents
                   unless  Me  3:t;  is
                   C;a55i';?a  as  a
                   'SCA  landfill.
                                                                   37

-------
   Criteria
 Alt 1:
Landfill
                                            Smiary  of  Evaluation of Final Alternatives
                                         Alt  2:
                                     Vitrificatian
   sit  3:
Soil  Mashing
   Alt 4:
Asphalt Cap
                                                                                                sou  Cover
  Alt  s:
No Action
5"ATE
ACCE?*SNC:
                *he Washington
                State Sept.  of
                Ecology has
                sustained an
                on-going
                invoiveient  in the
                zecision-iaiung
                process for  this
                site.  The State
                agrees that  the
                statutory
                requi*e§ents are
                being addressed
                and concurs  mth
                EPA's
                "ecaiiendations.
              See  Alternative  1.  tee Alternative 1. See Alternative 1.  See Alternative  1.  See  alternative
IZMUNITY       The Proposed Plan  One letter  Has      See  Alternative
ACCEPTANCE      for NUT had a      -eceived
                seven »eek public  questioning tne !SV
                couent period.     technology.
                Concern uas
                expressed through
                a petition, signet!
                ay approx. 100
                people, that any
                cleanup action at
                t-9 site Nould
                result in an
                increase in their
                utility rates.
                                                    See Alternative 1. See Alternative i. See Alternative '..
                                                                     38

-------
X. The Selected Remedy

     Approximately 1,200 cubic yards of soil  shall  be excavated  within  the
areas of PCB contamination of a concentration greater than  or  equal  to  10  ppm
(mg/kg) (Figure 2).   The actual excavation boundaries will  be  more  closely
defined In the Remedial  Design/Remedial  Action phase.  The  excavated soils
wil-1  be treated through  in situ vitrification such  that the concentration of
PCB in the remaining residual is less than 1  ppm (mg/kg).

     The excavated area  will  be backfilled;  then the entire site will  be
covered with a two-foot  thick layer  of native fill.   The site  will  be
hydroseeded to stabilize the  fill  cover.

     The on-site well  will  be abandoned  in accordance with  Washington  state
law.

     Post-Cleanup and  Continued Site Monitoring

     Part of the site  remediation  will  include plans for sampling the  deeper
     wood matrix of  the  barn, post-cleanup confirmatory sampling,  and  ongoing
     groundwater monitoring to document  the  effectiveness of the implemented
     measures.

     Barn

     Because of the  uncertainty relative  to  the  effectiveness  of
     decontamination of  the deeper wood  matrix of the barn, additional
     sampling and analysis  of the  wood  is  required.   Core samples  of the  wood
     in the barn will  be obtained  and PCB  analyses  will  be  performed on
     subsamples taken  from several different  depths  of the  core.  If core
     samples Indicate  significant  levels of  PCB  In  the wooden  structure,  the
     barn will  be acted  upon  as a  separate operable  unit.

     Groundwater

     Groundwater monitoring Is  an  important  activity which  will  be  included as
     part of the remedial  action.  As discussed  In  the RI report.  PCB has  a
     low  potential to  migrate from soil  into  groundwater.   Investigations  of
     the  rates  of PCB  desorption from soils  suggest  that the relationship
     between soil  PCB  concentration  and  transfer to  percolating  water  is
     highly dependent  on the  solubility of the particular PCB  cogener,  water
     flow rate,  and  the  diffusion  rate of  PCB out of the soil  matrix.   The
     aqueous solubilities of  PCB are extremely low  and are  most  likely the
     primary factor  limiting  PCB concentrations  In  slow-moving groundwater  in
     contact with highly contaminated soils.

     In the past,  certain  areas of the  site,  such as the seepage pit,  had  very
     high  PCB levels in  the soil.  At these  "hot spot" areas there was assumed
     to be  a higher  potential  for  migration  of PCB  into groundwater than  at
     other  areas.  Hot spots  were  excavated  during  the removal action in  1985
     on the basis  that this action would  reduce  the  driving force for
     contamination to  enter groundwater.
                                       39

-------
 If the remainder of the areas of soil where PCB greater than 10 ppm
 (mg/kg> are remediated, the potential for future groundwater
 contamination will be greatly reduced.  Lower levels of PCB which would
 remain In son should not contribute significantly to groundwater
 contamination.  Nevertheless, there is uncertainty regarding the degree
 and extent of low part per trillion contamination of groundwater which
 could have resulted in the past from migration of PCB from the  hot spot
 areas.  Therefore, a groundwater monitoring and aquifer characterization
 program/plan will be prepared that Is designed to provide sufficient
 Information upon which to base a decision regarding the need for
 groundwater remediation.

 Several  factors are important in obtaining the necessary groundwater
 information and should be considered In the design of the groundwater
 monitoring program:

 0    Characteristics of aquifer.  The existing well log data for
     monitoring wells and residential wells do not appear to provide
     sufficient hydrogeologlc Information to characterize the aquifer.
     The need for additional  monitoring wells that fully penetrate the
     aquifer and for the  performance of pump tests to define the
     site-specific aquifer characteristics must be evaluated in the
     design of the groundwater monitoring program.

 0    Direction of groundwater flow.  The groundwater table has  a low
     gradient near the site.   Very little Information exists relative to
     the direction of groundwater flow.  Based on the measurement of
     static water levels  at two different times, the flow appears to
     deviate slightly to  the  east and west of due north.  There is
     uncertainty whether  seasonal effects would cause a change  in flow
     direction which would in turn Impact contaminant movement.
     Monitoring groundwater levels at scheduled Intervals and taking
     samples from residences  found to be downgradient of the site will be
     a requirement of the groundwater monitoring program.

0    Sampling point for residential wells.  Sampling residential wells at
     a point before the water enters the houses In order to avoid
     Interferences from trace compounds that may be associated with PVC
     piping will  be a requirement of the groundwater monitoring program.

     PCB detection limit. PCB detection limits should be established at
     or  below five parts  per  trillion (5 ppt) to allow quantification of
     the risk of drinking groundwater at the 10~6 cancer risk level.
     To  achieve reliable  results at this low level, It Is essential that
     careful  adherence to sampling and analytical protocols and quality
     control  practices be followed.
                                  40

-------
XI. Statutory  Determinations

     Protection  of  Human  Health  and  the  Environment

     The  selected remedial  alternative best meets  all  statutory requirements
     particularly those of  CERCLA  as  amended  by  SARA.  The use of  the ISV
     technology  and  the subsequent placement  of  two feet of clean  fill over
     the  site  best  protects human  health and  the environment by eliminating
     PCS  contamination above  the  10  ppm  level  from the site and creating a
     barrier between  any  remaining low level  contamination and the existing
     ground surface.  The two-foot depth for  clean fill was derived from the
     recommended tilling  depths  for  common root  crops and should therefore be
     protective  for  both  residential  and agricultural future uses.

     Any  short-term  risks due  to  implementation  of this remedy can be
     mitigated/controlled through  proper process control, monitoring, and
     process execution.   Continued protection  at the site is assured through
     the  barrier layer and  the groundwater monitoring program.  In addition,
     since the remedial technology chosen for  the  site will destroy the PCS
     contamination,  there is  the added dimension of overall environmental
     protection.

     Attainment  of ARARs

     The  selected remedy will meet all applicable  requirements as  listed below.

              TSCA PCB regulations  in 40 CFR  761.60 - 761.79, which address
              the requirements for  storage and  disposal of PCB-contamlnated
              media.

              OSHA regulations  1n 20 CFR Subpart  1910.120, which  address
              worker protection standards for employees involved  in
              operations at CERCLA  sites.

         0    Department of Transportation:   Hazardous Materials  Regulations
              In 49 CFR, Subchapter C, which  address shipment of  any
              hazardous material  off site.

         New Waste Generation--0ff-gas Treatment

              0    Hashlnqton State Dangerous Haste Regulations (MAC 173-303)

                   The vitrification process  generates off-gases  from  the
                   soil that are  collected under  a hood and are cooled,
                   scrubbed, filtered, and chemically treated before release
                   Into the atmosphere.  There  may be dangerous wastes
                   generated from the off-gas treatment process that will
                   require designation and treatment or disposal  under  the
                   dangerous waste  regulations.

                   070  Designation of Dangerous  Waste.  This section
                   describes how  to determine whether a waste is  a dangerous
                   waste.
                                      41

-------
110  Sampling and Testing Methods.  This section describes
the testing methods which may be used in designating a
dangerous waste.

140  Land Disposal Restrictions.  The purpose of this
section is to encourage the best management practices for
dangerous wastes according to the priorities of RCW
70.105.150 which are, in order of priority:  reduction;
recycling; physical, chemical and biological treatment-
incineration; stabilization and solidification; and
landfill.  This section Identifies dangerous wastes that
are restricted from land disposal, describes requirements
for restricted wastes,  and defines the circumstances under
which a prohibited waste may continue to be land disposed.

141  Treatment, Storage, or Disposal  of Dangerous Waste.
This section describes  the requirements for offering a
dangerous waste to a TSD facility.

145  Spills and Discharges Into the Environment.  This
section sets forth the  requirements for any person
responsible for a spill or discharge Into the environment.

150  Division, Dilution, and Accumulation.  This section
prohibits dividing or diluting wastes to evade the Intent
of this regulation.

170  Requirements for Generators of Dangerous Waste.

180  Manifest.  Before  transporting dangerous waste or
offering dangerous waste for transport off the site of
generation, the generator shall prepare a manifest and
shall  follow all applicable procedures described In this
section.

190  Preparing Dangerous Waste for Transport.  This
section details requirements for packaging, labeling,
marking, and placarding before transporting off site or
offering for off-site transport any dangerous waste.

200  Accumulating Dangerous Waste On Site.  A generator
may accumulate dangerous waste on site for ninety days or
less after the date of generation without being subject  to
storage facility requirements.

201  Special Accumulation Standards.  This  section
provides for an extended accumulation period based on the
quantity of dangerous waste generated per month.

202  Special Requirements for Generators of Between  Two
Hundred Twenty and Two Thousand Two Hundred Pounds  per
Month that Accumulate Dangerous Waste  in Tanks.

210  Generator Recordkeeping.


                   42

-------
          220  Generator Reporting.

          230  Special Conditions.

Air Emissions

The vitrification process generates off-gases from the soil  that are
collected under a hood and are cooled, scrubbed, filtered,  and
chemically treated before release into the atmosphere.  The  air
emissions generated are addressed by the following directly
applicable requirements.

     0    Washington State General Regulations for Air Pollution
          Sources (WAC 173-400)

          Section 040    General  Standards for Maximum Emissions.
          This section addresses  control of fugitive dust and
          emissions during excavation and other field activities.

     9    Implementation of Regulations for Air Contaminant  Sources
          (MAC 173-403)

          Section 050    New Source Review.  Subsection (7)  -
          Portable Sources.  This subsection describes air emission
          requirements for new sources.

Well  Construction and Abandonment

     0    Minimum Standards for Construction and Maintenance of
          Hells (HAC 173.160)

          This regulation addresses how wells will be installed and
          abandoned by licensed well contractors.  Though reporting
          and recording requirements are not considered substantive.
          well contractors are required to submit well construction
          and abandonment information.

          Part One - General Requirements.

          020  General (introduction) and Subsection (1).  This
          section provides minimum well construction standards and
          details conditions that require well construction
          standards in excess of the minimum.

          065  Design and Construction.

          075  Design and Construction - Sealing of Casing - General

          085  Capping.

          Part Two - Water Supply Wells.

          415  Abandonment of Wells.  This section applies to  the
          abandonment of the water supply wells at the site.
                             43

-------
               Part Three - Resource Protection Wells.

               500  Design and Construction - General.

               510  Design and Construction - Surface  Protective
               Measures.   Subsections (1),  (2), (3), and  (5).

               520  Design and Construction - Casing.

               530  Design and Construction - Cleaning.

               540  Design and Construction - Well  Screen,  Filter  Pack.,
               and Development.

               550  Design and Construction - Well  Seals.   Subsection
               (1), (2),  and (3)  without the variance  requirement.

               560  Abandonment of Resource Protection  Wells.

The selected remedy will  meet all  relevant  and appropriate  requirements
as specified below.

     Soil  Contamination

          9    Washington State Dangerous Waste Regulations (WAC  173-303)

               145  Spills and Discharge Into the Environment.   This
               section sets forth  the requirements  for any  person
               responsible for a  spill  or discharge Into  the
               environment.  The  vitrification process  and  associated
               support activities  create the potential  for  a spill  or  a
               discharge  as a result of materials handling  or equipment
               malfunction.

               610  Closure and Postclosure.  Subsection  (2a) - Closure
               Performance Standard.  The owner or  operator must  close
               the facility In a  manner that minimizes  the  need for
               further maintenance; controls, minimizes or  eliminates  to
               the extent necessary to protect human health and the
               environment, postclosure escape of dangerous waste,
               dangerous  constituents,  leachate, contaminated run-off, or
               dangerous  waste decomposition products  to  the ground.
               surface water, groundwater,  or the atmosphere; and returns
               the land to the appearance and use of surrounding land
               areas to the degree possible given the  nature of the
               previous dangerous  waste activity.

               (Closure,  for the  purpose of Interpreting  these relevant
               and appropriate requirements is considered equivalent to
               completion of the  remedial action.)
                                  44

-------
Subsection (7d) - Postclosure Care and Use of Property.
Postdosure use of property on or in which dangerous
wastes remain after partial or final closure must never be
allowed to disturb the Integrity of the final cover or any
other components of any containment system, or the
function of the facility's monitoring systems, unless the
department finds that the disturbance is necessary to the
proposed use of the property and will not increase the
potential hazard to human health or the environment, or is
necessary to reduce a threat to human health or the'
environment.

Subsection ClOb (1XAXB)] - Notice in Deed to Property.
Within sixty days of closure the owner or operator must
record, in accordance with state law, a notation on the
deed to the facility property, or on some other instrument
which is normally examined during title search, that will
in perpetuity notify any potential purchaser of the
property that the land has been used to manage dangerous
waste and that its use is restricted as specified  in
subsection <7d).

645  Groundwater Protection.  Subsection (8, a through  g)
- General Groundwater Monitoring Requirements.  The owner
or operator must comply with the requirements of this
subsection for development of a groundwater monitoring
program that Is specified In the ROD as part of the
remedial action.

655  Land Treatment.  Unsaturated Zone Monitoring.
Subsection (6).

(The purpose of the monitoring specified in this section
is to determine what effect the vitrification process has
on the soil that surrounds the vitrified mass.  It  is
intended as a one time event, provided It  is performed  in
such a manner that reliable conclusions can be clearly
made.  "Background" in this instance is defined as  the
soil on site that Is just beyond the boundaries of  the
soil to be vitrified.  Sampling the soil In these  areas
must be done prior to and following vitrification.)

(a)  An owner or operator must establish an unsaturated
zone monitoring program.  The owner or operator must
monitor the soil and soil-pore liquid to determine  whether
dangerous constituents migrate out of the  treatment zone
during vitrification and cooling.
                   45

-------
               (b)  The owner or operator must Install an unsaturated
               zone monitoring system that Includes soil monitoring using
               soil cores and soil-pore liquid monitoring, using devices
               such as lysimeters.  The unsaturated zone monitoring
               system must consist of a sufficient number of sampling
               points at appropriate locations and depths to yield
               samples that represent the quality of background soil-pore
               liquid and the chemical  make-up of the soil that has not
               been affected  by potential leakage from the treatment
               zone; and indicate the quality of soil-pore liquid and the
               chemical make-up of the soil below the treatment zone.

               (c)  The owner or operator must establish a background
               value for each dangerous constituent to be monitored.

               (d)  The owner or operator must conduct soil monitoring
               and soil-pore liquid monitoring immediately below the
               treatment zone.

               (e)  The owner or operator must use consistent sampling
               and analysis procedures  that are designed to ensure
               sampling results that provide a reliable Indication of
               soil-pore liquid quality and the chemical make-up of the
               soil below the treatment zone.

          State Hater Pollution Control Act (RCH 90.48)

          Section 080 - Discharge of Polluting Matter in Waters
          Prohibited.   Groundwater impacts as a result of soil
          vitrification are not anticipated.  This section is Included to
          address any unidentified threats to the groundwater.

The selected remedy will meet all "to be considered" criteria as
specified below.

          TSCA PCB Regulations  in 40 CFR 761.120, Subpart G, which
          address the requirements for  cleaning up a PCB spill.

          Washington State Final Cleanup Policy - Technical (July  1984)

          This policy provides  a framework to determine cleanup  levels
          for releases of materials that threaten public health and/or
          the environment.   Ecology currently has a general requirement
          that PCB-contaminated soils are to be cleaned up to a
          concentration of 1 ppm.  The  FS considered cleanup of  PCB  in
          the soil down to 1 ppm.  Based on site-specific factors,  the  FS
          recommended a cleanup level of 10 ppm and a requirement  for 2
          feet of clean soil cover.  The proposed soil cleanup  is
          consistent with the final cleanup policy for the specific
          characteristics of the NWT site.

          (Regulations that are being developed under the Washington
          State Model  Toxics Control Act [Initiative 97] may  impact
          implementation of the cleanup policy for future  site  cleanups.)


                                  46

-------
      0    Draft  Toxic Air Contaminant New Source Review Guidelines
          (Ecology - August  1988).'

          These  guidelines are designed to assist regulatory agencies and
          the  regulated  community  in reviewing proposed new air pollution
          sources for toxic  air contaminant emissions.

          U.S. EPA. Statement of Policy to Protect Environmentally
          Significant Agricultural Lands (EPA - September 8. 1978)

          The  statement  calls upon the agency to evaluate and mitigate
          direct and indirect impacts on agricultural lands during the
          preparation and review of environmental impact statements (or
          functionally equivalent documents).

Cost  Effectiveness

The selected remedy appears  to be cost effective in  light of the degree
of protectiveness provided by the destructive element of the chosen
technology when compared to  the overall protectiveness of the
non-destructive technologies.  The projected cost of the selected remedy
is higher than the projected costs of most of the non-destructive
technologies; however, the added benefit in the degree of overall
protectiveness appears to be cost effective.

Utilization of Permanent Solutions and Alternative Treatment Technologies
to the Maximum Extent Practicable

During the comparative evaluation of the various cleanup alternatives, it
became apparent that all of  the final alternatives would meet the
applicable requirements  as defined for this site.  However, there were
two issues that significantly influenced the analysis and the consequent
choice of remedy when the "to be considered" requirements and the
following evaluation criterion were factored Into the analysis:

e    Overall protection of human health and the environment.

*    Long-term effectiveness and permanence.

     Reduction of toxlclty, mobility, or volume.

The two Issues relate to current and future land use and the potential
for destruction of the contamination.

As stated earlier in this Record of Decision, the NWT site  is  located  in
the middle of a rural area where the soils are designated as prime
farmland by the Soil  Conservation Service.  The land supports both
residential  and agricultural uses for several miles  in all  directions.
This  issue tended to make the alternatives that left the contamination on
site  much less desirable because these alternatives  would require  that
the site be classified as a  TSCA landfill.  The agencies believe  that
this  classification would be highly incompatible with current and
possible future land use.  Classification as a TSCA  landfill would very
likely preclude the site from being used as farmland or for residential
purposes.

                                  47

-------
When evaluating the alternatives for 1) their degree of protection of
human health and the environment, 2) their long-term effectiveness and
permanence, and 3) their ability to reduce the toxlcity, mobility, or
volume of the contamination, the alternatives that were capable of
destroying the contamination were viewed as much more desirable than the
nondestructive alternatives.

The final remedy was selected because it was considered to provide the
best combination of attributes in terms of all the evaluation criteria.
It Is highly protective, attains all ARARs including the "to be
considered" requirements, and is believed to be cost effective with
respect to the degree of overall protection provided.

Preference for Treatment as a Principal Element

The statutory preference for treatment that permanently and significantly
reduces the toxicity, mobility, or volume of hazardous substances as a
principal element is met by the use of a thermal destruction technology.
Contaminant destruction will be implemented to the maximum extent
practicable.   The use of this technology provides for a permanent
reduction in the mobility, toxicity, and volume of the contaminant at  the
site.
                                  48

-------
XII. Responsiveness Summary

     After Identifying a preferred alternative and informing the public  of the
proposed plan, EPA opened a thirty-five day public comment period on
August 7, 1988.  A copy of the Proposed Plan and an accompanying fact sheet
were mailed to all people on the mailing list for the site.   The fact sheet
stated that a public meeting would be held if requested;  however, no meeting
was requested.

     The PRPs requested an extension of the public comment period,  so a
fourteen-day extension was granted to allow them to submit comments.  The
public comment period closed on October 5, 1988.

     Background on Community Involvement

     Several  residents of the community had been concerned about the site
     during the 1970s and had complained to the state and other officials
     about possible contamination at the site.  They noted that children in
     the neighborhood had played at the site over the years.  They also
     commented that there had been frequent burning at the site.  They were
     assured that there was no significant problem on the basis of local.   •
     state and federal testing which did not show significant levels of
     contamination.

     Community interest was not high when the site was listed on the NPL in
     1984 because of the earlier assurances that the site did not pose a
     threat and a lack of awareness that more recent sampling had revealed
     much higher levels of PCS contamination.

     The community was therefore taken by surprise when EPA chose to undertake
     an  immediate removal of PCB-contaminated material from the site. The
     appearance of workers in protective gear and heavy press coverage of  the
     "emergency" caused confusion and worry for residents.  In subsequent
     community interviews done by EPA in March 1986 (in preparation for  the
     RI/FS),  local  residents complained that EPA had failed to keep the
     community informed and Involved, and that either EPA had overreacted  or
     that earlier problems had been concealed.

     During those 1986 interviews, a number of residents  and officials
     expressed confusion and/or concern about EPA coming  back to do the
     RI/FS.   Some were confused because they said they had been told after the
     removal  that "the site had been cleaned up."  These  and others did  not
     understand the Superfund process and/or requirements.  Some felt that EPA
     was  overreacting to the severity of the problem by returning to do  the
     RI/FS.   Some also expressed concerns about other NUT sites in the area
     and  the  stigma and economic costs associated with Superfund sites.

     In  response,  EPA explained the goals and results of the 1985 removal  and
     the  goals of the RI/FS as part of an ongoing effort to provide timely
     information to the community.  During the RI/FS, EPA and  its contractors
     maintained contact with local officials and sent four fact sheets to  the
     public and the press.

     A thirty-five day comment period (extended to forty-nine days) followed
     publication of the Proposed Plan and availability of the RI, FS, and
     Administrative Record at information repositories for the  site.


                                       49

-------
 Summary of Comments and Agency Responses

 The following Is a summary of the comments that were received during the
 public comment period for the FS and the corresponding agency responses.
 All submitted comments have been included in the Administrative Record
 for the site.

 The comments submitted by the Geosafe Corporation (the owners of the ISV
 technology) focused on updating the information contained  in  the FS
 regarding the ISV technology.  The current information Includes the
 following.

 0     ISV technology has been continuously developed since  1980.

 8     The number of ISV tests performed to date Is about sixty.

,"     The first ISV machine is presently committed to three projects.

 0     It is  not necessary to dry soil  prior to ISV treatment;  however,  it
      requires energy for the ISV process to remove water by vaporization.

 0     Leaching of PCS from the residual monolith is impossible since
      organics do not remain in the glass residual.

      ISV 1s a pyrolysis process.

 0     The unit cost estimate for ISV ranges from to $250 to $350 per  ton.

 0     Mobilization and setup time Is expected to be less than  one week.

 The current Information regarding the ISV technology was factored into
 the evaluation of the remedial alternatives.

 Comments were received from the PRP "steering committee" that "was formed
 as  a result of a consensus among a larger group of parties Identified by
 EPA."   Their detailed review comment document and detailed agency
 responses have been Included In the Administrative Record.  Their
 summarized  comments and EPA's summarized responses follow:

 e    Comment
      1.   The Risk Assessment prepared by EPA and included as Appendix A
      to the FS employs excessively conservative assumptions.   A risk
     assessment that employs more reasonable but still very conservative
     assumptions Indicates that the removal  action already conducted by
     EPA has brought risks associated with residual soil contamination to
     acceptable levels and that additional action is not necessary.

     EPA Response
      1.   EPA agrees that a few of the assumptions used in the Risk
     Assessment were overly conservative and these have been modified
      (see below).  However, for the majority of the assumptions, EPA used
     either an average value or a range of values.  These  resulted  in
     conservative yet reasonable worst case estimates of risk.
                                   50

-------
      The following assumptions/values were changed and the risk
 assessment was  revised accordingly:

 •     New vegetable uptake factors and consumption rates were
      calculated.  In addition,  risks were calculated assuming that
      25% of  the vegetables consumed by a person are grown on the
      site, as well as the original assumption of 100%.

      For the grazing scenario,  only average PC8 soil concentration
      were used  instead of the average and the average plus 2
      standard deviation.  Risk  estimates were also made assuming
      that a  person obtains 25%  of his beef and dairy products from
      cattle  grown on the site as well as 100%.

 0     Risks associated with consumption of groundwater from off-site
      wells were deleted due to  the lack of reliable data.

 0     For modeling purposes, the concentration of dust in the air was
      assumed to be 50 ug/nn.

 8     Risk estimates were performed using the weighted average
      surface soil value and the weighted average plus two standard
      deviation values calculated by Landau and Associates.

 The Risk Assessment, as revised, is summarized In section VI of this
 Record of Decision and is Included 1n its entirety as part of the
Administrative Record for the site.  See Table 2 on page 23 for a
 summary of the risk levels associated with the site.  The risk
calculation for the grazing scenario (which assumes the site is used
for beef and dairy cattle grazing) resulted In an estimated
upper-bound  lifetime cancer risk ranging from 2.5 X 10~3 to
 1 X 10~2.  Based on these results, EPA and Ecology believe that
further remedial action on the  site 1s necessary.

Comment
2.   Were further action nonetheless required, soil cover or
cement-soil  stabilization/immobilization are the most appropriate
alternatives, and they meet the statutory criteria of 42 U.S.C. §
9621.   "Thermal destruction" by on-site vitrification Is too costly
and technically uncertain to constitute a desirable alternative.

EPA Response
2.   Following current EPA guidance and § 121 of SARA, the FS
evaluated remedial alternatives using the following criteria:

     a.   Compliance with applicable or relevant and appropriate
          requirements (as defined by federal, state and  local
          regulations and/or policy)

     b.   Permanent and significant reduction of toxicity, mobility
          or volume

     c.   Short-term effectiveness

     d.   Long-term effectiveness

                             51

-------
      e.    Implementabi1ity

      f.    Cost

      g.    Community acceptance

      h.    State acceptance

      1.    Overall protection of human health and the environment

EPA recognizes that the recommended alternative for this site is
more  expensive than some of those proposed by the reviewers.
However, the FS (as summarized by the following) demonstrates that
this  cost  1s offset by  the benefits under the other criteria
required to satisfy the CERCLA process.

0     Short-term effectiveness:  stabilization would require
      additional testing that may delay Implementation.

0     Long-term effectiveness:  ISV represents the lowest long-term
      risk  from residuals remaining after implementation.

9     Permanent and significant reduction of toxlclty, mobility, or
      volume:  ISV results in destruction of PCS in the soil matrix,
      rather than Increase in the volume of contaminated solids, less
      certain reductions In toxldty or mobility through fixation, or
      relocation of contaminants to a landfill.

0     Implementabi1ity:  ISV has undergone testing for
      PCB-contaminated soils specifically.  Fixation technologies
      must  be demonstrated to assure long-term stability.

0     Compliance with ARARs/TBCs:  Residual PCB concentrations above
      the allowable limits under TSCA are not left on site.

0     Overall protection of human health and the environment:   Risk
      of direct contact or exposure to contaminated soils and dust 1s
      eliminated by the direct treatment and destruction of PCB to an
      acceptable risk level.  The potential for PCB leaching from the
      treated material to other matrices (groundwater) Is also
      eliminated.

Efforts to Identify the least costly, most effective, and  innovative
measures for remediating PCB-contaminated sites are appreciated and
supported.   However, these measures must 1) meet the  intent of the
ARARs as presented in the FS, and 2) be applicable to the  specific
contaminants and site conditions.  Remedial actions that  leave
residual PCB soil contamination above 50 ppm (mg/kg)  do not meet  the
ARAR-defined objective of contaminant destruction set forth under
TSCA  761.60:  "Any non-liquid PCBs at concentrations  of 50 ppm or
greater in the form of  contaminated soil, rags, or other  debris
shall  be disposed of:
      (i)   In an incinerator which complies with Section 761.7; or,
      (11)  In a chemical waste landfill which complies with Section
           761.75."

                             52

-------
 nor  under  the  technical  requirements for construction of chemical -
 waste  landfills  defined  by  TSCA  761.75. Unfortunately, little
 scientific or  CERCLA-based  support  is provided by the reviewers for
 their  proposed approach  of  mixing PCB-contaminated soil with
 Portland Cement.

 Testing costs  for  the  cement/soil stabilization process
 (approximately $120-150  thousand) would have to include additional
 long-term  leachability tests to  demonstrate long-term viability of
 this option.   The  suggested process Is not proven for PCS
 specifically.  In  comparison,  the vitrification testing would only
 require a one-time demonstration of applicability to site-specific
 soils  as the process has been  proven to destroy PCB, and this test
 could  be conducted in  a  relatively  short period of time (i.e., 2 to
 3 months).

 A recent, in-depth review of stabilization technologies (Pollution
 Engineering Magazine.  August 1988)  states that Portland Cement
 stabilization  technology is more appropriately applied to waste
 materials containing inorganic (i.e., heavy metals) contamination.
 It is  widely known In  the concrete  industry that even very low
 concentrations of organic compounds can hinder the molecular binding
 and curing processes of  aging  concrete.  While it is possible that
 binding of PCB-contaminated soil in cement blocks reduces the
 mobility or accessibility of the soil matrix, research indicates the
 primary contaminant (PCB) may  migrate through concrete to Teachable
 and weathering areas near the  surface.  When compared to an
 alternative such as ISV, which destroys the contaminant, the
 long-term uncertainty  makes fixation less desirable.

 Section 121 of SARA states a preference for selecting remedial
 actions that employ treatment  technologies that permanently and
 significantly  reduce toxlcity, mobility, or volume of the hazardous
 substances as  their principal  element.  This preference Is satisfied
 when treatment is used to reduce the principal threats at a site
 through destruction of toxic contaminants, reduction of the total
mass of toxic  contaminants, irreversible reduction in contaminant
mobility, or reduction of total  volume of contaminated media.  None
of the alternative remedial methods suggested In the review document
 (no action, soil  cover, off-site land disposal), with the exception
of the cement/soil stabilization process, meet any of the tests
under  this criterion.

 The FS recommended thermal destruction of PCB in PCB-contaminated
 soils with concentrations at or  above 10 ppm (mg/kg).  Thermal
destruction technologies include incineration and vitrification,  as
well  as the thermal-based processes such as catalytic combustion  and
 infrared destruction.  Upon further review and cost analysis  by  EPA
and further review of  documentation on demonstrations of  the
vitrification  technology, the  best  thermal destruction process for
 this site was  determined to be vitrification.  This determination
was made based on  1) relative  ease  and foreseen schedule of
mobilization,  2)  advantageous  costs over other thermal processes  as
 reflected in the FS, 3)  acceptability of the vitrified mass  as an
on-site residue over other  conventional materials classified  as  ash,

                             53

-------
     4) the foreseen local acceptance of contained, "1n-the-ground"
     thermal destruction of PCB contaminants over conventional
     Incinerator operations, and 5) the criteria set forth for  technoloav
     selection in the FS.

     The statement that a soil cover is equivalent in protect!veness  to
     the technologies recommended In the FS Is based solely on  the
     reduction of the numerical value for short-term risk.  It  ignores
     the significance of all other .criteria and requirements under  the
     ARARs as they were appropriately considered In the FS.  The
     technique is not a permanent solution and would require restrictions
     on land use in perpetuity.

     During the FS process, the appropriateness of deed and access
     restrictions were considered.  For this specific site, these
     measures are considered Ineffective and inappropriate when viewed  1n
     the context of the assumed long-term land uses and are therefore
     less protective.  In conducting the FS, It was assumed the completed
     (cleaned up) site would support uses similar to those at surrounding
     properties and would be acceptable for eventual development into
     relatively unrestricted agricultural (grazing/farming) or
     residential  uses.

•    Comment
     3.   A groundwater monitoring program Is desirable to verify that
     on-slte and off-site groundwater have not been contaminated.

     EPA Response
     3.   We are in agreement that a groundwater monitoring program Is
     desirable and this was expressly stated in the FS and Proposed Plan.

Clallam County Public Utility District submitted a comment letter.   It
is paraphrased by the following comments, which are followed by the
respective EPA responses.

*    Comment
     1.   Based on a review of the RI, a six-inch soil scrape is all  that
     is necessary to remove soil with PCB contamination above the 10 ppm
     (mg/kg) action level.

     EPA Response
     1.   As stated In the FS, assumptions were made regarding the
     distribution of PCB contamination with depth within  the cleanup
     area.  Because of the porous nature of soil at the site and handling
     practices of concentrated liquids (being applied directly to the
     site), a linear decrease is a conservative assumption  for the
     relationship of PCB concentration with depth.

     The theory has been advanced that high clay content  in  shallow  soils
     at the site retained free-flowing PCB materials  in the  upper six
     inches.
                                  54

-------
 The  variability of  the  silty  clay  layers  is highlighted in Figure"
 1.5  of  the  RI  document  (HDR 1988)  and casts serious doubt on this
 layer's overall uniformity and ability  to contain PCB.  The
 discontinuous  nature of these layers is well known and documented
 for  outwash materials (alluvial  sediments) of the northwest region.
 Some surface  soils  with the higher organic and clay content were
 removed during the  IRM.   To assume that the estimated PCB retention
 capabilities of these removed materials (a proposed decrease rate of
 16 to 1)  is equally applicable to  the more porous underlying sand
 and  gravel  layers is not  consistent with the fact that PCB
 concentrations at or above 1  ppm (mg/kg) were detected in the areas
 in question at a depth  up to  2.5 feet.

 Comment
 2.    They questioned the  use of  in situ vitrification because of the
 experimental nature of  the technology and had particular concerns
 regarding the  a) formation of PCDO and PCDF at the outer edges of
 the  vitrification zone; b) uncontrolled gas venting during the
 vitrification  process;  and c> contamination of surface water by PCDD
 and  PCDF on the edge of the vitrified zone.

 EPA  Response
 2.    The development of the ISV  technology was initiated In 1980.
 There have  been approximately sixty tests performed to date using
 this  technology.  ISV has been successfully used In
 engineering-scale studies involving PCB-contamlnated soil.

 a.    PCDD and  PCDF  are  PCB oxidation products and will be sampled
      for during the site-specific  treatabillty testing.  According
      to the tests done  to date,  it is believed that the PCDD/PCDF
      content observed was generated above the melt, under the hood,
      rather than in the ground.

 b.    The ISV off-gas treatment system Is designed to maintain a
      slight negative pressure In the off-gas hood.  It is not
      necessary that the hood  Itself be airtight; in fact,
      significant amounts of excess air are allowed Into the hood to
     oxidize any combustible pyrolysis products.  In the event of a
      loss of power  to the system, an emergency backup power supply
      is employed to maintain flow  through the off-gas system.

c.   See response to a.

Comment
3.    They felt that the short-term effectiveness of Alternatives  1,
2, and 3 Is the same due  to excavation and the potential for
fugitive dust  generation.

EPA Response
3.    The short-term effectiveness  with respect to excavation and
fugitive dust  generation  is the  same for Alternatives  1, 2, and  3  as
defined in  the FS and Proposed Plan.  This information was factored
 into  the remedial alternatives analysis.
                             55

-------
 8    Comment
     4.   The operation and maintenance cost was underestimated for both
     Incineration and vitrification technologies.

     EPA Response
     4.   Operation and maintenance costs are considered to be the costs
     of operating and maintaining the remedial action fix.  As
     incineration and vitrification are destructive technologies, they
     are one-time actions and therefore do not require ongoing operation
     and maintenance inputs.  In contrast, the reliability of
     non-destructive alternatives such as capping, soil  cover, and cement
     fixation is dependent upon the continued Integrity of that
     particular remedial action fix.  Those kinds of fixes must be
     monitored and maintained/repaired in perpetuity, resulting in
     ongoing operation and maintenance costs.

     Responses to concerns regarding the viability of vitrification as a
     full-scale technology are Included In comments on the FS provided by
     Geosafe Corporation to EPA.  The basic ISV technology has been
     developed for large-scale operations.  Tests of large-scale
     equipment, available since late 1983, have removed scale-up concerns
     and verified economic projections.  For reference,  the large-scale
     equipment will  process up to 5 tons/hr and will produce up to 800
     tons of melt In a single setting.  Large-scale ISV experience has
     produced data sufficient for estimating labor, materials, and other
     input critical  to costs.  Geosafe Corporation has provided an
     updated cost for ISV for smaller scale applications <$250-330/ton),
     and this cost is competitive with other thermal destruction
     technologies.

A local geologist had several concerns, which are listed below with the
respective EPA responses.

0    Comment
     1.   He was concerned that dust generated by excavation of soils on
     site and the potential for that dust to expose residents of Everson
     or to enter the food chain through local dairy cattle consumption of
     "dusted" vegetation would be a problem during remediation.

     EPA Response
     1.   The potential  for fugitive dust generation during remediation
     does exist.  Part of the remedial action design will Include
     measures to mitigate the generation of those dusts.

     Comment
     2.   The commenter thought EPA should have specified a preference
     for either incineration or vitrification and asked whether EPA
     sacrificed effectiveness for lower cost by selecting vitrification
     rather than incineration.

     EPA Response
     2.   EPA and Ecology have specified that vitrification is  the
     thermal destruction technology to be used at the NWT site.   ISV  is
     less expensive than incineration, but both technologies  provide  for
     the destruction of PCS in soil.

                                  56

-------
 A  petition  signed  by  approximately  one  hundred  people  and  submitted  to
 EPA  suggested  that institutional  controls  were  more  appropriate  than  the
 preferred plan  due to the  possibility that their  electrical  rates would
 increase If  the PRPs  (mostly  public utility districts)  were  made to  pay
 for  the remediation on site.

 A  letter was sent  to  all petition slgnees  (with approximately one-third
 being returned  to  EPA stamped "addressee unknown") explaining what
 criteria the agency must use  in evaluating the  various  cleanup
 alternatives and how,  after completion  of  this  evaluation, the agency
 believes that  the  preferred alternative best meets the  requirements  as
 represented  in  the evaluation criteria.

 The  Snohomish County  Public Utility District wrote and  recommended deed
 restriction and follow-up  groundwater monitoring  rather than the
 recommended alternative of thermal  destruction, because in their view it
 is more cost effective and appropriate  for the  circumstances of  the  site.

 Deed restrictions, such as limiting access to the site or  limiting use of
 the  site, were  considered  in  evaluating what the  appropriate cleanup
 alternative for  the site should be.  EPA and Ecology believe that deed
 restrictions alone are inappropriate for this site due  to  the surrounding
 land uses and close proximity of  residences.  Follow-up groundwater
 monitoring will  take  place. (See  response  to comment 2  from  PRP  steering
 committee.)

Other Comments  Received
 Two  local residents wrote  and recommended  Alternative  4 rather than
Alternative 2 because  of a belief that  Alternative 4 will  be adequately
 protective and  that a  better  and  safer  method of  dealing with PCS will
 eventually be developed.

 SARA requires EPA  to  look  for a permanent  solution that reduces  the
 toxlcity, mobility and volume of  waste, and  not to choose  Interim
 solutions that  will have to be redone later.
                                   57

-------
U.S. ENVIRONMENTAL PROTECTION AGENCY
             REGION 10
          1200 Sixth Avenue
     Seattle, Washington  98101
     ADMINISTRATIVE  RECORD INDEX

                 for

  NORTHWEST TRANSFORMER - REMEDIAL

         Everson,  Washington
          September 8, 1989

-------
                                                                    NORTHWEST TRANSFORMER • REMEDIAL^
                                                                     INOEX TO ADMINISTRATIVE RECORD
                                                                            September 8,  1989
Ooc. •      file

1.  Background

00000001.   Background



00000002.   Background
Type/Description
00000003.   Background
00000004.   Background
00000005.   Background
00000006.   Background
00000007.   Background
     re referral  for enforcement
evaluation. Northwest Transformer
Service, Everson. Washington
      Investigations of uncontrolled
hazardous waste sites, FIT Project,
task reports to the EPA, Contract No.
68-01-6056, Northwest Transformer
Salvage Tard. BEIlinghM, Washington,
final report, TOO 10-8108-05

Background letter re Notice of
Noncompl lance with PCB regulations
under Tonic Substances Control Act

Cover letter with attached copy of
Findings re Release and Threat of
Release of Hazardous Substances and
Order for (Mediate Removal re
Northwest Transformer Company

Federal On Scene Coordinator's Report,
Hazardous Waste Site Cleanup. Northwest
Transformer Salvage Yard, Everson,
Washington, for 4 Apr! I -17 Nay 1985

Northwest Transformer Salvage Yard,
Field Investigation, Final Report, TOO
R10-8503-04

Cover lettera. Notice and Complaint re
Administrative Action against Northwest
Transformer Service for Alleged
Violation of PCB Regulations
                                          Pate
3/23/81
4/82
                                                        t Pop   Author/Organ i z a t i on
        Alexandra B. Smith/EPA
50      Ecology t Environment,
        Inc
1/21/83
3/29/85
7/85
8/85
                                                                                      9/30/86
        Alexandra B.  Smith/EPA
15      Charles E.  Findley/EPA
53      Region 10 Technical
        Assistance Team
70      Jeff Uhldden/Ecology t
        Environment.  Inc
              19      Anita  J. Frankel/EPA
                                                  Addressee/Organ!zaifon
                                                  Lloyd E.  Reed/EPA
Ron Wallace/Northwest
Transformer Service
Ronald and Noah
Wallace/Northwest
Transformer Company
Region 10/EPA
                                                                                                                                        J. E. Osborn/EPA
                                   Noah Wallace and Merle
                                   SidelI/Northwest
                                   Transformer  Service

-------
                                                                   NOB!HUESt IHAMSfOBMER • REMtOfAj.
                                                                     I MOCK TO ADMINISTRATIVE RECOUP
                                                                           Septeafcer 8.  1989
Doc. *

2.  Preliminary Assessment Report
                                            Type/Description
00000008.   Preliminary assessment report   Potential hazardous Matte site--
                                            prellalnery assessment
                                          Pale
                                          8/IS/84
                                                       0 Pa»   Author/Organization
                                                                                           Addreisee/OraanliatIon
3.  Site Investigation Reports

00000009.   Site investigation report*


00000010.   Site investigation report*


00000011.   Site investigation reports

00000012.   Site investigation reports



00000013.   Site investigation reports



000000U.   Site investigation reports



0000001S.   Site investigation reports
Potential haiardoua waate site--site
inspection report

Potential haiardoua waate site--
tentatlve dlapoaltion

Potential hazardous waate log

Potential hazardous waste site—site
Inspection report. Part 7, owner
Infonaatlon

Potential hazardous waste site-site
Inspection report, Part 1, site
location and Inspection infonaation

Prel(Binary alte Inspection, report of
Northwest Transformer Salvage Vard,
Everaon, Washington, TOO R10-8408-12

Inspection Report re Northwest
Transforaer Salvage Yard
3/5/81
3/19/81
3/19/81
8/31/84
1
19
1
1
C.
C.
C.
--
U. Rice/EPA
U. Rice/EPA
Rice/EPA

                                          9/25/84       1       Jeff Whidden/Ecology t
                                                               Environatnt, Inc
                                          10/26/84      39      Jeff Uhldden/Ecology t      J. E. Osborn/EPA
                                                               Environment.  Inc
                                          10/29/86      1       Sue SiSM/Uashington DOE
 t.  MPL Proposals and Connenti

 90000016.   NPL proposals and conaents
Excerpt fraa Fed. Regiater,  V.  49,
MOO, pp. 40320-40352. EPA,  40CFR Part
300, Aawnd. to National Oil  C Hazardous
Substances Contingency Plan; National
Priorities list-Proposed Rule
                                          10/15/84
34

-------
                                                                    NORTHWEST TRANSFORMER  • REMEDIAL^
                                                                     INOEX TO ADMINISTRATIVE RECORD
                                                                           September 8. 1989
Poc. «      file

00000017.   NPL proposals and comments
00000116.   NPL proposals and comments
Tvpe/Oescrlotion

Excerpt fro* Fed. Register. V. SI.
fill. pp. 21054-21098. EPA. 40CFR Part
300, AMnd. to National Oil t Hazardous
Substances Contingency Plan; National
Priorities List-Final Rule
Letter:  Cements re comments on
"Solidification/lsMobiliiation as a
viable Remedial Action"  by Landau
Associates, 1/4/89.  (15-Page report of
consents included)
Date

6/10/86
1/9/89
I Pas   Author/OraanIlation

45
 Addressee/OmanilatIon
18      Frederic A Morris/Perkins    Sally Nartyn/EPA
        Coie
5.  RI/F5 Work Plans

00000018.   RI/FS Work Plans




00000023.   RI/FS Work Plans



00000052.   RI/FS Work Plans



00000073.   RI/FS Work Plans
Work plan for RI/FS re Northuest
Transformer Salvage Yard. Everson,
Washington
1/87
Letter with attached Statement of Work    10/18/85
for Feasibility Studies re RI/FS for
Northwest Transformer

Feasibility Study Work p|.n for           10/23/87
Northwest Transformer Service Salvage
Yard

Cements on RI/FS work plan               11/19/86
349     Memingson,  Durham I
        Richardson.  Inc
              15       Nonas Lewis/EPA
              39      NOR Engineering. Omaha.
                      NE
Department of  the  Army.
Kansas City District.
Corps of Engineers and
EPA, Region 10

Edward Ray/Army Corps  of
Engineers--Kansas  City
District

Corps of Engineers.
Kansas City District
                     Clynls A. Stuspf/UA Oept.    Norma lewis. EPA
                     of Ecology
6.  Correspondence and Metros

00000019.   Correspondence and nemos


00000020.   Correspondence and menus
Nemo re Northwest Transformer             3/11/87
Compliance with SARA

letter re description of possible         8/19/87
future set Ions by EPA at Northwest
Transformer facility
                     Ron Vernesonl/EPA
                                                                                          File
             2       Philip C. Ml I lam/EPA        Joe Doffing.  Attorney at
                                                law

-------
                                                                    NORTHUEST  TRANSFORNER  • RENEOIAL
                                                                     INDEX TO  ADMINISTRATIVE RECORD.
                                                                           September 8. 1989
Doc. *      fill

00000021.   CorretpondMKt and
00000041.   Correspondence and memo*



            Correspondence and nemos
00000042.

00000043.   Correspondence and nemos


00000044.   Correspondence and nemos


0000004S.   Correspondence and nemos


00000055.   Correspondence and nemos



00000056.   Correspondence and nemos



00000057.   Correspondence and nemos



00000074.   Correspondence and nemos



 00000117.   Correspondence  and nemos
Type/Description

Letter re comments on draft Scope of
Work for Feasibility Study at Northwest
Transformer Salvage Yard

Letter of notification re proposed
Superfund project to State
Letter of notification re potential
liability of responsible parties

Letter of notification re potential
liability of responsible parties

Letter of notification re potential
liability of responsible parties

List of naMS of potential  responsible
parties

Letter regarding release of hazardous
substances at Northwest Transformer
Superfund alte with  list of PUPS

Letter regarding release of haiardous
substances at Northwest Transformer
Superfund site without PHP  list

Letter regarding release of haiardous
substances at Northwest Transformer
Superfund site with  Mailing list

Request  to be removed from PHP list  for
the Northwest Transformer  Superfund
site

Nemo:  Re completion of review of
sasples  from Northwest Transformer
Date

9/9/87



6/17/85



10/2/86


10/2/86


10/2/86
 10/2/86
 10/2/86
6/8/88
 9/14/88
 2/1S/B9
i Pas   Author/Oraanilet \ on

2       Sally Nartyn/EPA



3       Kathryn N. Oavidson/EPA



2       Charles Findley/EPA


2       Charles Findley/EPA


2       Charles Findley/EPA
 19
        Charles Findley/EPA
        Charles Findley/EPA
                      Charles Findley/EPA
H. Roy Oonehower/Public
Utility Dlst.  No. 2 of
Grant City

Alice Tau/EPA
                           Addressee/Groan!leti on

                           Clark Cunlon/Army Corps
                           of Engineers--Kama*
                           City Oiatrlct

                           Ken Back/Washington
                           Planning and Community
                           Affairs Agency

                           Noah Us11ace/Northwest
                           Transformer

                           Nerle SidelI/Block Steel
                           Claude Potts
                            Trans-Mountain Pipeline
                            Corp, Vancouver. B.C.
                           John S. Uilllams/Uhatcom
                           guilders, •ellingham, UA
                                   Nailing  list
                                                 Robie Russell/EPA
                                                 Joyce Crosson/EPA

-------
Doc. »

000001 IB.   Correspondence and nemo*





00000119.   Correspondence and memo*



00000120.   Correspondence and memos
00000121    Correspondence and memo*
                                                                    NORTHWEST TRANSFORMER  - REMEDIAL
                                                                     INDEX TO ADMINISTRATIVE RfCQBp
                                                                           September 8, 1989
Type/Description

Transmittal of final ATSOR Health
Aase*aa*nt
Transmittal of sup (attached) and
explanation of tenas for land
classification In wnatcon County

Mean:  Re question of whether Northwest
Transforawr alt* lies in an area
containing significant agriculture
lands and if any related regulations
are ARARs

Letter:  Cements re selection of
alternative for stabilisation of
Northwest Transformer site
                                          Bill          * Pa|

                                          4/14/89       1




                                          5/17/89       2



                                          6/16/89       1
                                          8/2S/89
                      Author/Organ!tati on

                      Stephen 0. Von
                      Allawn/Agency for  Toxic
                      Subatances and Disease
                      Registry, Atlanta,  CA

                      John K. Clllies/U.  S.
                      Oept. of Agriculture
                      Christine Psyk/EPA
                      U. J. fInnegan/Puget
                      Power
                                    Addressec/Oraaniiatlon
                                    Phil  MlllasVIM
                                    Christine Psyk/EPA
                                                                                                                                       Sally Martyn/EPA
                                   Charles flndley/ EPA
7.  SampI ing Plans

00000022.   Sanfil ing Plans


8,  lab Reports/Raw Data

00000036.   Lab reports/raw data



00000037.   Lab reports/raw/data
Engineering and design, che*ical
Data Package Case «3980, located at EPA
Region 10 Headquarters
Letter re analytical results with
attached: quail tat lave review of sample
nusbere 1SS6J-01 through 1556J-07,  aid
MSS chroMtograM,  chain of custody
form, quality control sunaary for
polychlorinated dfoxin/furan analysis.
Located at Northwest Transformer HU 924
files at EPA Regional Office
12/30/8S
Shipping
date:
3/29/8S

4/18/85
43      Ar«y Corps  of Engineers
        EAL
        Paul  Taylor. Michael J.
        Nillle,  Terl J.
        Vergara/CalIfornia
        Analytical Labs, Inc.
                                                                                          EPA Region 10 files
                                                                                          John Osborn/EPA

-------
                                                                   NORTHWEST TRANSFORMER - REMEDIAL
                                                                     INDEX TO ADMINISTRATIVE RECORD
                                                                           September 8,  1969
Doc. *      Mil

00000036.   lab reports/raw data



00000039.   lab reports/raw data



00000040.   Lab reports/raw data



00000046.   Lab reports/ran data


00000047.   Lab reports/raw data



OOOOOM8.   Lab reports/raw data


00000049.   Lab reports/raw data


00000050.   Lab reports/raw data


MMOOOS1.   Lab reports/ray data


 XM00061.   Lab reports/raw data


 MMM0062.   Lab reports/raw data


 10000063.   Lab reports/raw data
                                            Type/Description
    at ion foras rt parameter hazards,
•aaple nuabers 85121650 through
85121654
    at Ion fora* r« parameter hazards,
saeple nuabers 65181025 through
65181052

Suajaation fonas re parameter hazards,
sasple nusbers 85201047 through
85201049

turning site, saaple analysis results
for saaple nuabers 8435571 and 81435572

Everson, UA, aasple analysis results
for sasple nuabere 85121775 through
5121785

Saaple analysis results for saaple
nuabers 85121850 through 85181654

Saaple analysis rtsults for saaple
nuabers 85181025 through 85181052

Saaple analysis results for sanple
nusbers 85201047 through 85201049

Saaple analysis results for saaple
nuabers 86224615 through 66224617

»C6 analytical data ausaary package for
81 soil aaaplea

Soil saaple analysis data for Northwest
Transformer site for PC8s. 81 sasples

RevieM of analytical data on PCii In
groundwater. Northwest Transforswr site
Pate          < Pas   Author/Oraaoiiat ion         Addrestee/Ornanlzation

1985          5       EPA Manchester Laboratory



1985          32      EPA Manchester Laboratory   --



1985          3       EPA Manchester Laboratory
8/31/84
3/19/85
3/19/85
5/1/85
5/14/85
6/2/86
8/11/87
9/8/87
4/21/66
2
11
5
30
3
3
9
7
12
EPA Lab, Region 10
EPA Lab, Region 10
EPA Lab, Region 10
EPA Lab, Region 10
EPA Lab. Region 10
EPA Lab, Region 10
Victor »astrop/Ver»ar,
Inc. Springfield. VA
Paul P. tarber/COE,
Kansas City District
Michael J. Conzett/HOR
                                                 Corp* of Engineers,
                                                 Kansas City District

                                                 Sally Nartyn/EPA
                                                 Clark  Cunlon. COE.
                                                 Kansas City District

-------
                                                                    MQOIHUtSI TRANSFORMER • REMEDIAL
                                                                     INDEX TO ADMINISTRATIVE RECORD
                                                                            September 8.  1969
Doc. »      File

00000075.   Lab reports/raw data



00000076.   Lab reports/raw data



00000077.   Lab reports/raw data



00000078.   Lab reports/raw data



00000079.   Lab reports/raw data



00000080.   Lab reports/raw data




00000081.   Lab reports/raw data



00000082.   Lab reports/raw data


00000083.   Lab reports/rat* data


00000084.   Lab reports/ran data
Tvpe/Descr lotion
    »: Draft  approval of work
accomplished during removal action
Covar (attar  transmitting results of
laboratory analysis of Mail water
samples taken 7/16/87

Covar (attar  transmit ting results of
laboratory analysis of well water
samples taken 7/16/87

Covar (attar  transmitting results of
laboratory analysis of wall water
saaplaa taken 7/16/87

Covar latter  transmitting results of
laboratory analysis of wall water
samples taken 7/16/87

Disposition Fora:  Transmittal of Corps
of Engineers' review comments of tha
Remedial Investigation of Northwest
Transformer Salvage Tard
       Comments on the need for
additional groundwater sampling for
PCB'S

Nemo:  Answer to concerns about
Inconsistent analytical results

Nemo:  Answers to questions rising from
Remedial Investigation

Letter:  Transmittal of data reference
Mod's determination of PCi levels In
groundwater
Date          » Pgs   Author/Organ!istion

11/3/87       1       Rene
                      Fuentes/EnvlronmentaI
                      Services Division

11/16/87      7       Richard T. Sprague/HOR
                      Infrastructure, Inc
 11/16/87      7       Richard T. Sprague/HOR
                      Infrastructure, Inc
 11/16/87      7       Richard I. Sprague/HOR
                      Infrastructure,  Inc
11/16/87      7       Richard T.  Sprague/HOR
                      Infrastructure,  Inc
5/3/86        5       John E.  Noylan/Corps of
                      Engineers,  Kansas City
                      District
5/5/68        1       Dana Davoli/ESD, EPA
6/7/66        2       Raleigh  Farlow/QA
                      Management Office, EPA

4/25/88       2       Sally Nartyn/EPA
6/30/88       2       Nichael J. Comett/HOR
                      Engineering, Inc
 Addrenee/Oreafli set I on

 Joyce Croason/OA
 Mr. ft Nrs.  D.  Turner,
 Everson, UA 98247
 Mr. ft Nrs. R. Harrlmen,
 Everson,  UA 98247
 Mr.  ft Mrs. E. •ergermon.
 Everson, UA 98247
 Mr.  ft Mrs. R. Reynolds,
 Everson, UA 96247
 EPA
 Sally Martyn/EPA
Sally Martyn/EPA
Pat Storm/N ft E
Assessment,  EPA

Clark Cunion/U.S. Arny
Corps of  Engineers

-------
                                                                    NORTHWEST TRANSFORMER -  REMEDIAL
                                                                     INDEX TO ADMINISTRATIVE RECORD
                                                                           September 0,  1989
Poc. »       Flie

9.  Interaacncv Agreement*

00000024.    Interagency agreements



00000025.    Interagency agreement*



00000026.    Interagency agreements
00000027.   Interagency agreement*
00000113.   Interagency agreements
00000114.   Interagency agreement•
00000115.   Interagency agreement*
Tvpa/Daacriot ion
 Inttragency agreement/amendment between
 EPA and Army Corps of Engineer* re
 •I/FS at Northwest Transformer

 Intaragsncy agreement/amendment between
 EPA and Ansy Corps of Engineer* re
 •I/FS at NorthMMt Tranafonaar

 Letter with attached contract, fee
 proposal, and *cope of aervices re
 agrismsnt between EPA and Army Corp* of
 Engineer* for RI/FS at Northwest
 Tran*former

 Interagency agreement/smtndment between
 EPA and Army Corp* of Engineer* re
 RI/FS at Northwest Transformer

 Interagency agreement/amendment between
 EPA and Army Corp* of Engineer* re
 •I/FS at Morthweit Tranaformer

 Letter:  •• Washington State Applicable
 and Relevant and Appropriate
 Requirementa (ARARs)

 Letter:  Re Washington Stats Apptfcable
 and Relevant and Appropriate
 Reauirement* (ARARs)
                                          Pefe
9/24/85
3/12/66
3/23/87
5/26/87
2/13/89
8/2/89
9/5/89
              i Pas   Author/Groan)tattoo
        Ernests R. Barnes/EPA
        Charles Flndley/EPA
                                    Addrctsee/Oroanllat i on
                                                  Martha N. Lows/Army
                                                  Corps of Engineers
                                                  Martha M. Lowe/Army
                                                  Corps of Engineers
49      Paul  0.  •arber/Army Corps    Ronald Verna*oni/EPA
        of Engineer*--Kansas City
        District
7       Charles E.  Flndley/EPA
        and Martha  N.  Lowe/Army
        Corps of Engineers

IS      Oddvar K. Aurdal/EPA and
        Will Iam Nut I loan/Army
        Corps of Engineera
        8rad J. Euy/Waahlngton
        Oapt. of Ecology
       Charles E. Findley/EPA
Christine Psyk/EPA
lekrry
Hussmsn/Uaahlngton Dept.
of Ecology
10.  Community Relations

00000028.   Comaunity relations


00000029.   Conmunity relations
Article entitled. -PCi'*:  Everson
struggles wllth toxic uncertainty

Mailing list for those in attendance at
Everson town meeting 4/8/85
1/85
       Diana Olets/Kllpsun

-------
                                                                    NORTHWEST TRAMSfORMER •  REMEDIAf,
                                                                     I MOCK TO ADMINISTRATIVE RECORD
                                                                           September 8. 1989
OOC. f      flic

00000030.   Community relations



00000031.   Community relations



00000032.   Community relations


00000033.   Coomunity relations


00000053.   Community relations


00000054.   Comunity relations


00000085.   Co*nunity relations



00000086.   Community relations



00000087.   Community Relations


00000088.   Community Relations
Ivoe/Descr I Dt I on                          pug

Letter re stete intergovernmental         6/17/85
review proceaa for Northwest
Transformer

Handwritten notes re meetings with        4/1-2/86
members of community re cleanup work at
Northwest Transformer

Community Relations Plan for Northwest    6/86
Transformer, Mission Pole Road site

feet sheet re Northwest Transformer  •    6/29/87
Superfund site

fact aheet re Northwest Transformer       7/28/88
Superfund site

fact sheet re Northwest Transformer       8/15/88
Superfund alte

Notice of investigations results and      8/17/88
public comment period for Northwest
Transformer Superfund site

Notice of Investigations results and      8/17/88
public comment period for Northwest
Transformer Superfund alte

Transmittal letter for information        8/17/88
repository

Correction to fact Sheet of 8/15/88       8/22/88
                                                        f Pos   Author/Orqenilat i on

                                                        3       Kathryn N. Oavidson/EPA



                                                        9       N.  L.



                                                        19      EPA


                                                        1       EPA


                                                        1       EPA, Region 10


                                                        1       EPA. Region 10


                                                        1       Bel Iingham Herald.
                                                                •ellingham, UA
                            Addreisce/OrflfnJiatlon

                            l*n Sack/Washington
                            Planning t Coamunity
                            Affairs Agency
                            General Public
                                                               Uestsida Record-Journal,     General Public
                                                               ferndale, UA
                                                               Sally Nartyn/EPA


                                                               Sally Nartyn/EPA
                           Barbara Skinner/Everson
                           library, Evarson,  UA
jl.  References/Guidance

00000034.   References/guidance
List of guidances for Administrative
Record
EPA

-------
                                                                    NORTHWEST TRANSFORMER -  REMEDIAL,
                                                                     INDEX TO ADMINISTRATIVE RF.COBO
                                                                           September 8,  1989
                                                                                                                       10
                                            Tvne/Descr iptIon
                                                                                      Date
                                                                                                    § PQS   Author/Oraanilat i on
                                                                                           Addressee/Groan!iatton
12.  Naoa and Photos

00000035.   Naps and photos
Aerial photographic analytic of
Northimt Transforawr
8/85
17      F.  Mynar,  I I/Lockheed
        Engineering  and
        NanagaMnt Strvlce*
        Company.  Inc.  prepared
        for EPA
13.  Qraft Remedial Investigation Reports
            Draft remedial  investigation    Draft Remedial  Investigation report,
            reports                         Northwest Transformer
                                          10/87
              230     HDR Engineering. Omaha
                                   Corps of Engineers--
                                   Kansas City District.
                                   EPA Region 10
U.  Remedial Investigation/feasibility Study Consents

00000065.   RI/FS study comments            CoMents on draft RI/FS
00000066.   Rl/fS study comments
00000067.   Bl/fS study conroents
00000068.   RI/FS study comnents
00000089.   RI/FS study comments
00000090.   RI/FS study comments
00000091.   RI/FS study conments
                                            CoMwnta on draft RI/FS
                                            Consents on draft RI/FS
                                      .    11/30/87      U


                                          2/25/88       22



                                          7/1/88        3
Response to cements on draft RI/FS       5/6/88
Letter:  Coasunts on RI/FS for
Northwest Transformer
                                                                                      9/20/88
Letter requesting period of cossstnt on    9/9/88
RI/FS be extended 30 days

Handwritten letter stating preference     9/17/88
for alternative *1
              46


              4
        Brad EMy/Uashington Dept.
        of Ecology

        Paul  D.  larber/Corps of
        Engineers--Kansas City
        District

        Martin Uerner/UA Dept.  of
        Ecology

        EPA Region 10, UA Dept.
        of Ecology

        Philip K. Jackson/Clsltan
        County PUD «1

        Frederick A.
        Morris/Perkins Coie

        Elaine t Jordan Silves,
        Everson. UA
                                                 Sally Nartyn/EPA
                                                 Nike Coniett/KDR
                                                 Engineering. Qj*aha.  ME
                                                 Brad Ewy/UA Oept. of
                                                 Ecology
                                                                                                                                       Sally Nartyn/EPA
                                                                                                                                       Robert Goodstein/EPA
                                                                                                                                       Sally Nartyn/EPA

-------
                                                                    NOHTHUtST TRANSFORMER • RENEQIAy
                                                                     INOEK TO ADMINISTRATIVE RECORD
                                                                            September 8.  1989
Doc, f      File


00000092.   RI/FS  study comments


00000093.   RI/FS  study contents



00000094.   RI/FS  study conments



00000095.   Rl/fS  study conments



00000096.   RI/FS  study conments


00000097.   Rt/FS  study conments


00000090.   RI/FS  study conments



00000099.   RI/FS  study cowmen«•



00000100.   RI/FS  study comments



00000101.   RI/FS  study conments



00000102.   RI/FS  study comnents
Type/Description

Mtltlon/Coamcntary on proposed plan
and cleanup alternatives

Letter extending public comment period
for Northwest Transformer site another
2 week*

Lettert  Response to petition
requesting no cleanup action to be
taken

Letter requesting destruction of former
letter, dated 9/21/88. and its
replacement with attached letter

leter:  Comments on Northwest
Transformer draft Feasibility KStudy

Letter:  Response to EPA's RI/FS et
Northwest Transformer

Cover letter and review cements on
RI/FS. Northweat Transformer alte
                            its
Nemo:  Response to FS c
pertaining to risks
Letter:  Comments on response to
comments (sepsrste from FS consent
period)

Letter:  Comments on response to
comments (sepsrste from FS comment
period)

Nemo:  Response to review comments of
the Northwest Transformer Steering
Conmittee
Pate

9/20/88


9/22/88



9/29/88



10/3/88



10/4/88


10/5/88


10/S/88



11/3/88



11/U/88



10/26/88



12/88
                                                        i Pas   Author/Oraani tat ion

                                                        11      Uhatcom County area
                                                                residents

                                                        1       Usyne Crotheer/EPA
                                                                Sally Hsrtyn/EPA
                                    Addrtssee/Oreanilet 1on

                                    Sally Nartyn/EPA
                                    Northwest Tranaformsr
                                    Superfund site steering
                                    committee

                                    Concerned
                                    citixens/Uhatcom County
                                                        3       Gary R.  Gates, Deming. UA   Sally Nartyn/EPA
                                                                98244
7       James E. Hansen/Geosafe
        Corp

2       J. 0. Naner/Snohomish
        County PUD *1

55      Puocst South Power t
        Light Company t Landau
        Associates

S       Dana
        Oavoll/Envlronomental
        Health Assessment,  EPA

IS      Frederic A.
        HorrIs/Perk ins Cole and
        Landau Associates.  Inc

4       James E. Hansen/Geosafe
        Corp
47      NOR Engineering, Omaha,
        NE
 Sally Nartyn/EPA


 Sally Nartyn/EPA


 Sally Nartyn/EPA



 file/EPA



 Sally Nartyn/EPA



 Sally Nartyn/EPA
Corps of Engineers--
Kansas City District and
EPA

-------
                                                                    NORTHWEST  TRANSFORMER • REMEDIAL
                                                                     INOEK  TO  ADMINISTRATIVE RECORD
                                                                           September 8, 1989
                                                                                                                       12
Doc. *      F)H
                                            Tvoe/DescriptIon
                                                                                      Date
                                                        t Pat   Author/Ornaniiat ion
                                                 Addresset/Oraanliation
15. Final  Remedial Investigation Report

00000070.   Final remedial investigation    Final Remedial Investigation Report,
            report                          Northwest Transformer Superfund site
                                                                                      7/U
                                                        246    HOI Engineering, Omaha.
                                                               HE
                                                 Corp* of Englneera--
                                                 Kantai City Olttrlct t
                                                 EPA legion 10
16.  Final Feasibility Study deport

00000069.   Final feasibility study
            report
00000103.   Final feasibility study
            report

00000104.   Final feasibility study
            report
Final Feasibility Study Report:
Northwest Transforswr (Mission/Pole)
Superfund alta
a/M
TransMlttat letter and Ml ling list for   8/26/58
feasibility study
Response to request for Feasibility
Study Information
9/26/88
                                                                                                    160     HOR Engineering, Omaha,
                                                                                                            NE
                      Sally Nartyn/EPA
                                                                                                            Sally Nartyn/EPA
                                   Corp* of Engineers--
                                   Kansas City District  i
                                   EPA Region 10

                                   Nailing list
                                   Ken Norgan/Clallua
                                   County PUD
17.  Ritk Assessment

00000071.   Risk assessment

00000105.   Risk assessment


00000109.   Risk assessment


00000110.   Risk assessment
Risk Assessment, Northwest Transformer    •-

Revised Risk Assessment, Northwest        12/29/88
Transformer

Revised Risk Assessment, Northwest        --
Transformer

Nemo:  Record of conference call re       11/03/88
comments on Risk Assessment
13
27
35
5
EPA Region 10
EPA Region 10
•-
Dana Davoli/Er
                                                 File/EPA
                                                                                                           Health and Assessment.
                                                                                                           EPA
 IB.  Proposed Cleanup Plan

 00000072.   Proposed cleanup plan
Proposed Cleanup Plan:  Northwest
Transformer (Mission/Pole) Superfund
site
8/17/88
10
                                                                                                           EPA Region 10

-------
BPJf^f
lili
                                                                   NORTHWEST TRANSFORMER -  REMEDIAI,
                                                                    INDEK TO MMIfHHMTIVt BECTIg
                                                                          Soptesfcer 8. 1989
lyDt/DeecrlDtlon
                                         Date
              * Pot  Author/Organ! tat ion
                                                                                                                                      Addressee/Oraanlutlon
19.  Meetings

00000056.   Meetings


OOOOOOS9.   Meetings


00000060.   Meetings


00000106.   Meeting*


00000111.   Meetings



00000112.   Meeting*
                                SuMary of EPA/COE/Ecology/HM Meting
                                5/26/86 (u/notea and roster
                                                                >ting
        of EPA/COE/Ecotogy/NDR
7/6-7/06 (w/roeter)
                                SuMary of EPA/COE/Ecology/HM Meeting
                                S/6/88 (M/aganda and roster)

                                Notice of InfonMtion sweting on
                                8/22/88 for P»Ps and Mi I ing list

                                Handwritten notes (M/roster) for
                                Morthiwst TransforMr Meting held
                                12/22/68

                                Handwritten notes (notes  Include naecs
                                of attendees)  for Northwest TransforMr
                                   ting held 8/22/89
6/13/88


7/88


S/16/88
                                         12/22/88
                                         8/22/69
        EPA Region 10


        EPA Region 10


        EPA Region 10


        Charles Findley/EPA
                                                                                          Meeting participants
Meeting participants
                                                                                         Meeting participants
                                                                                         Mailing liat
2p.  Health Assessments

00000107.   Health asses*e*nte



00000106.   Health aaaessMnts
                                Draft  ATSOI  Health AasessMnt for
                                Northwest  TransforMr Salvage Yard NPl
                                aite
                                         12/6/88
                                Final  ATSOR Health Assessawtt for         4/U/89
                                Northwest  Transfonaar Salvage Yard NPL
                                site
11      Agency for Toxic
        Substances and Disease
        Registry, Atlanta,  GA

11      Agency for Toxic
        Substances and Diaease
        Registry. Atlanta.  GA
                                                Phil Millaat/EPA
                                                                                                                         Phil Nillaa/EPA
21.  Record of Decision

00000123    Record of Decision
                                Record of Decision for Northwest
                                TransforMr aite
                                         9/89
             71
        Robie G. Russell

-------
                                                               MQRTHKST TBAMSK»MER  - EEMEOIM.
                                                                 IMOEK TO AOMIMISTHATIVC MOMO
                                                                       September 8. 1989
                                                                                                                   U
        ill Ocsinn Docuncnu
1000122    >«MdUl  Ottlgn OocuMnta
ttport:  Application and Evaluation
Considerations  for In Situ
Vitrification Tachnology
                                        Data         » Pas   Author/Orasntntion
4/89         75      Ceosafe Corp
                                                                                                                                AddresiM/Oraanliatlon

-------