PB98-964101
                                 EPA 541-R98-024
                                 September 1998
EPA  Superfund
       Record of Decision:
       North Bronson Industrial Area, OU 1
       Bronson, MI
       6/19/98

-------
                              DECLARATION
                    SELECTED REMEDIAL ALTERNATIVE
                FOR THE NORTH BRONSON INDUSTRIAL SITE
                             OPERABLE UNIT I
              CITY OF BRONSON, BRANCH COUNTY, MICHIGAN
STATEMENT OF BASIS AND PURPOSE

This document presents the selected remedial action for the North Branson Industrial
Area Superfund site (the site), Operable Unit I (OU 1). This remedial action was
chosen in compliance with the Comprehensive Environmental Response,
Compensation, and Liability Act, 1980 PL 96-510, as amended by the Superfund
Amendments and Reauthorization Act of 1986 and, to the extent practicable, the
National Oil and Hazardous Substances Pollution Contingency Plan. This decision is
based on documentation contained in the Administrative Record for the site.

The United States Environmental Protection Agency concurs with the selected remedy.

ASSESSMENT OF THE SITE

Actual or threatened releases of hazardous substances from this site, if not addressed
by implementing the response action selected in this Record  of Decision (ROD),
present a potential  threat to public health, welfare, or the environment.

DESCRIPTION OF THE SELECTED REMEDY

This ROD addresses OU 1  at the site. OU 1 is an interim action that addresses the
eastern and western sludge lagoons, groundwater impacted by the sludge lagoons,
exposure to area-wide groundwater contamination,  and County Drain #30 (CD #30).  A
second and final OU (OU 2) will be developed to address secondary source areas of
groundwater contamination. The secondary source areas are related to releases from
an industrial sewer that was used to convey waste to the sludge lagoons.

The major components of the selected remedy for OU 1 include the following:

•  Excavating contaminated eastern lagoon sludge and soil and filling the excavated
   area with clean soil.
•  Dredging sediment from CD #30.
•  Consolidating contaminated waste from the eastern lagoon and CD #30 into the
   western lagoons.
•  Covering the western lagoons to control risks to human health and the environment
   associated with  exposure to contaminants.
•  Installing a French Drain between the western lagoons and CD #30 to capture
   contaminated groundwater.

-------
•  Pumping contaminated water from the French Drain.
•  Constructing a treatment wetland to treat contaminated water collected by the French
   Drain. The goal for groundwater extraction and treatment is to reduce the
   concentration of contaminants to comply with state and federal surface water
   discharge criteria.
•  Discharging treated water from the treatment wetland to CD #30.
•  Monitoring groundwater and surface water quality to assess the effectiveness of the
   remedy.
•  Marking the western lagoon area and the treatment wetland with permanent site
   markers.
•  Fencing in the western lagoon area and the treatment wetland to control risks to
   human health and the environment associated with exposure to contaminants.
•  Placing enforceable restrictions on future land and groundwater use.

STATUTORY DETERMINATIONS

The selected remedy is protective of human health and the environment, complies with
federal and state environmental requirements that are legally applicable or relevant and
appropriate to the remedial action, and is cost-effective. This remedy uses permanent
solutions and alternative treatment technologies to the maximum extent practicable for
this site.  However, because treatment of the principal threats of the site (eastern and
western lagoon sludge) was not found to be practicable, this remedy does not satisfy
the statutory preference for treatment as a principal element of the remedy.  The
consolidation and  capping of lagoon sludge within one portion of the area of
contamination, combined with containment and treatment of groundwater impacted by
lagoon sludge below the water table, was determined to be protective of human health
and the environment and significantly more cost-effective than excavation and
treatment of the lagoon sludge.

Because the remedy will result in hazardous substances remaining on-site above
health-based levels, a review of this remedy will be conducted within five years after
commencement of the remedial action. This review is to ensure that the remedy, over
time, continues to provide adequate protection of human health and the environment.
William E. Muno, Director                           Da
Superfund Division   '
United States Environmental Protection Agency
                                                    /IT Iff
                                                    te
Russell J. Harding, Director           '              bate
Michigan Department of Environmental Quality

-------
                          TABLE OF CONTENTS
                                                                  PAGE

 1.   SITE NAME, LOCATION, AND DESCRIPTION	1

 2.   SITE HISTORY AND ENFORCEMENT ACTIVITIES	3

     2.A.   Construction of the Lagoons and the Industrial Sewer System	3
     2.B.   County Drain #30	4
     2.C.   History of Industrial Operations	4

           2.C.1.  L.A. Darling	4
           2.C.2.  Douglas Components Corporation	5
           2.C.3.  BRC	6
           2.C.4.  BPC	6
           2.C.5.  Bronson Specialties, Inc	6

     2.D.   Assessment and Enforcement Activities	7

3.   HIGHLIGHTS OF COMMUNITY PARTICIPATION	8

4.   SCOPE AND ROLE OF RESPONSE ACTION	9

5.   NATURE AND EXTENT OF CONTAMINATION	10

     5.A.    Summary	10

           5.A.1.   Chlorinated VOCs	11
           5.A.2.   Metals	11
           5.A.3.   PAHs and PCBs	11
           5.A.4.   Source Areas	11

     5.B.    Area Specific Overview of Site Contamination	15

           5.B.1.   The L.A. Darling Subarea	15
           5.B.2.   The Scott Fetzer Subarea	15
           5.B.3.   The Abandoned Industrial Sewer	15
           5.B.4.   The Eastern and Western Lagoons	17
           5.B.5.   CD #30	17

     5.C.    Fate and Transport of Contaminants	18

6.   SUMMARY OF SITE RISKS	18

-------
                       TABLE OF CONTENTS (continued)


                                                                      PAGE

     6.A.    Human Health	19

            6.A.1.  Western Lagoon Area	19
            6.A.2.  Eastern Lagoon Area	19
            6.A.3.  CD #30	19
            6.A.4.  Groundwater	20

     6.B.    Ecological Concerns	20

            6.B.1.  Terrestrial Ecosystem Plants and Animals	20
            6.B.2.  Aquatic Ecosystem Plants and Animals	20
            6.B.3.  Risk Summary Statement	21

7.    CLEANUP GOALS	21

     7.A.    Soil or Sludge	21
     7.B.    CD #30 Sediment	21
     7.C.    Groundwater	21

8.    DESCRIPTION OF REMEDIAL ALTERNATIVES	25

     8.A.    Area-Specific Alternatives	25

            8.A.1.  No Action Alternatives	25
            8.A.2.  WL Area Alternatives	25
            8.A.3.  WLG	26
            8.A.4.  EL Area	26
            8.A.5.  ELG	27
            8.A.6.  CD #30	27

     8.B.    Site-Wide Alternatives	28

            8.B.1.  RCRA Subtitle C Determination	29
            8.B.2.  The Treatment Wetland	31
            8.B.3.  Capital Costs	31
            8.B.4.  Common Elements	32
            8.B.5.  Alternative 1, No Action	33
            8.B.6.  Alternative 2	33
            8.B.7.  Alternative 3	33
            8.B.8.  Alternative 4	33
            8.B.9.  Alternatives	33

-------
                      TABLE OF CONTENTS (continued)

                                                                    PAGE

            8.B.10.  Alternatives	34
            8.B.11.  Alternative?	34
            8.B.12.  Alternatives	34

9.   SELECTION OF THE PREFERRED REMEDY	34

     9.A.    Threshold Criteria	35

            9.A.1.   Overall Protection of Human Health and the Environment	35
            9.A.2.   Compliance with ARARs	35

     9.B.    Primary Balancing Criteria	35

            9.B.1.   Long-term Effectiveness and Permanence	35
            9.B.2.   Reduction of TMV	36
            9.B.3.   Short-Term Effectiveness	36
            9.B.4.   Implementability	37
            9.B.5.   Cost	37

     9.C.    Modifying Criteria	37

            9.C.1.   EPA Acceptance	37
            9.C.2.  Community Acceptance	37

10.  THE SELECTED REMEDY	38

     10.A.    The Els	38
     10.B.    ELG    	39
     10.C.    CD #30	39
     10.D.    The WL Area	39
     10.E.    Groundwater Treatment	39
     10.F.    Cost    	40

11.STATUTORY DETERMINATIONS	40

     11.A.    Protection of Human Health and the Environment	40
     11.B.    Compliance with ARARs	41

            11.B.1. Chemical-Specific ARARs	41
            11.B.2. To Be Considered Requirements	42
            11.B.3.  Location-Specific ARARs	43
            11.B.4. Action-Specific ARARs	43

-------
                        TABLE OF CONTENTS (continued)

                                                                     PAGE

     11.C.   Cost Effectiveness	44
     11 .D.   Using Permanent Solutions and Alternate Treatment Technologies
            to the Maximum Extent Practicable	44
     11.E.   Preference for Treatment as a Principal Element	44

12.  DOCUMENTATION OF SIGNIFICANT CHANGES	45
FIGURES
    Figure 1 - North Bronson Industrial Area	2
    Figure 2 - Organic Groundwater Contamination	12
    Figure 3- Inorganic Groundwater Contamination	13
    Figure 4 - Inorganic Soil Contamination	14
    Figure 5-Area Specific Overview of Site Contamination (five subareas)	16
TABLES

    Table 1 - North Bronson Lagoon Soil, and Sludge Cleanup Goals	22

    Table 2 - Determination of North Bronson County Drain #30
             Sediment Goals (ug/kg)	23

    Table 3 - North Bronson Lagoon Groundwater Cleanup Goals	24
APPENDICES

    Appendix A- Responsiveness Summary

    Appendix B - Administrative Record Index

-------
                             DECISION SUMMARY

 1.  SITE NAME, LOCATION, AND DESCRIPTION

 The North Bronson Industrial Area Superfund site (the site) is located in the city of
 Bronson, Branch County, Michigan. The site is located in portions of the northeast
 quarter of Section 11 and the northwest quarter of Section 12, Township 7 South,
 Range 8 West, and occupies the northern (industrial) area of the city of Bronson.  The
 site is bounded to the east by Lincoln Street as projected northward to County Drain
 #30 (CD #30), to the north by CD #30, to the west by Burr Oak Road as projected north
 to CD #30, and to the south by Fillmore and Union Streets (Figure 1). These
 boundaries reflect the general area that was studied during the Remedial Investigation
 (Rl).

 The site encompasses an area of 220 acres with a maximum topographic relief of
 approximately 12 feet. Topography varies little between  the northern and southern
 portions of the site, ranging from a high of 915 feet above mean sea level (MSL) to a
 low of approximately 903 feet above MSL.  The lowest point on the site is the bottom of
 CD #30. The topography north of CD #30 gently rises to the north.

 The site is zoned by the city of Bronson for industrial use only. Land use in the larger
 area consists of a mixture of industrial, residential, and agricultural.  Based on the 1990
 census, 2,342 people live within a one-mile radius of the  site.

 Two predominant features and contaminant source areas of concern are the two sets of
 lagoons located in the northeast and northwest sections of the site, just south of CD
 #30.

 CD #30 is the major surface water feature within the site  and defines the northern  site
 boundary. CD #30 is a drain approximately 0-6 feet wide and 3-6 feet deep . Water
 depth varies from 1-10 inches with an average surface flow of approximately 1-2 feet
 per second.  The origin of the drain is a small marsh area about one-half mile east of
the site. The drain flows east to west eventually discharging to Swan Creek about 1.5
 miles northwest of the site. Swan Creek is  a tributary of the  St. Joseph River.

The site geology consists of surficial silt, clay, and sands to a depth of 0-17 feet, fine to
 coarse sand and gravel from 7 to 63 feet (upper aquifer), silt and a clay layer from 17 to
 50 feet (assumed aquitard), and sand and gravel from 50 to 100 feet (lower aquifer).

There appear to be two sand and gravel aquifers separated  by an aquitard at the site.
The aquitard is assumed to be continuous across the site. The depth to the water table
at the site ranges from 3-9 feet below ground surface. Local groundwater flow is
affected by CD #30 within the site area.  Groundwater flow direction in the upper aquifer
up to approximately 600 feet south of the drain appears to be north-northwest.
 Immediately north of the drain, the flow direction appears to  be south-southwest.

-------
  I—  WESTERN
  |  LAGOON AREA
  Figure  1
  r  -  COUNTY DRAIN
  i     AREA -30
     \
       \
                                      T
          \
            \
--INDUSTRIAL
                                               STERN "NEW
                                               "OON AREA

                                               REA
  INDUSTRIAL -~-U!
SEWER  SUBAREA  | ,' .

                  T
                                                                                NORTH  •RONSOM
                                                                                INOU8TROA9. AREA
                                                                                (SHAMCM COUNTY
                                                                                   LOOT ION
                                                                             SOURCE
                                                                             SuoERFuNO SITES «HE u>CEa me «oi"0mi<
                                                                             OP TMC us EMVlRQNMCNrAL pnarECMON
                                                                             HCCNCT AND T»€ MONR PlJtSUANT TO THE
                                                                                                   •II SITES LOCATIONS ANO BOUNDARIES HAVE
                                                                                                   BEEN DETERMINED FROH r«CVIOUSLT
                                                                                                   SITES HA»S OICIIIZEO
                                                                                                   BASE MATS.
                                                                                       IZEO ONTPO TM£ MIRIS
                                                                                                 f\MR
                                                                                                 l/linji
                                                                             SGDB

-------
Private wells located within the site boundary and screened in the upper aquifer were
found to be contaminated with site-related contaminants. All of the impacted wells have
been removed from service and all of the affected homes have been connected to the
municipal water system (private well survey). A public water supply well is screened in
the lower aquifer.  No contaminants were ever found in this well, but because of the
proximity of this well to the site and because of its low yield, this well was taken out of
service by the city.
2. SITE HISTORY AND ENFORCEMENT ACTIVITIES

Contamination detected at the site is the result of industrial activity and waste handling
practices in the North Bronson area since the early 1900's. Initially, several industries
discharged plating and other industrial wastes directly into CD #30. To reduce the
amount of contaminants entering the drain, the city of Bronson constructed seepage
lagoons to retain the waste generated by industry. An industrial sewer system was also
constructed and used to convey waste from the facilities to the lagoons.

2.A.      Construction of the Lagoons and the Industrial Sewer System
Douglas Components Corporation (DCC Plant #1) began operations in 1910, L.A.
Darling in the early 1900s, and Bronson Reel Company (BRC) in 1922.  In the 1930s
cattle and fish kills were reported from ingestion of cyanide-contaminated water from
CD #30.  It was believed the contaminated water was due to direct discharge of
industrial waste to CD #30.  This prompted the  city of Bronson to construct lagoons to
reduce the amount of contaminants entering CD #30 from direct discharges.

The western and eastern lagoons were built in 1938 and 1949,  respectively, to contain
metal-laden plating and other industrial waste generated by several industries in the area.
An industrial sewer system was used to transport waste from the industrial facilities to the
lagoons.  Between 1930 and 1970, the city of Bronson owned and operated both sets of
lagoons.  The western lagoons, which the city owns today, were used until 1980.

Three western  lagoons were excavated  between 1938 and 1950.  By 1955 a fourth
western lagoon had been added. Between 1930 and 1955, the western lagoons were
interconnected with piping and valves to control water levels and discharges to CD #30.
From approximately 1939 to 1949, BRC, DCC Plant #1, L.A. Darling, and Bronson
Plating Company (BPC) reportedly discharged  wastes to the western lagoons.  BRC
reportedly discharged wastes to the western lagoons from 1939 until approximately
1960.

In 1949 the city of Bronson constructed  two new lagoons 1,500 feet due east of the
western lagoons to meet the increased demand for disposal.  L.A. Darling, BPC, and
the Douglas Division-Scott Fetzer Company were connected to the new eastern
lagoons via an industrial sewer line.  By 1955 aerial photos reveal a third eastern
lagoon east of  the two original eastern lagoons. By 1958 a fourth eastern lagoon  was

-------
evident north of the three existing lagoons, and by 1967 a fifth eastern lagoon was
added due east of the other four lagoons.  Scott Fetzer Company, LA. Darling, and
BPC ceased use of the eastern lagoons in 1951, 1967, and 1981, respectively.

In 1970 BPC purchased the eastern lagoons from the city (BPC had moved its
operations to this location in 1953).  Between 1970 and  1974, BPC expanded by
constructing a building which apparently was located where three of the five eastern
lagoons had previously been. By 1981 BPC reportedly stopped discharging waste to
the two original eastern lagoons, and by 1988 expanded to cover more of the area
where the other three eastern lagoons were located. Sludge and waste material was
reportedly removed from the three eastern lagoons and  the lagoons backfilled prior to
BPC constructing buildings over them. Only the dry remnants of two original eastern
lagoons have been located.

2.B.      County Drain #30
CD #30 begins in a marsh area about one-half mile northeast of the site. It flows in a
westerly direction and empties into Swan Creek approximately 11/2 miles northwest of
the site. CD #30 defines the northern boundary of the site.

In the 1930s and then again in the 1950s, reports of events appeared in the local
newspapers describing cattle dying after drinking the water from CD #30. The western
lagoons were, reportedly, constructed in response to the 1930's events, in an effort to
reduce the amount of contaminants from local industry entering CD #30.

There are currently six outfalls discharging into CD #30 within the site boundaries.
These include two BPC outfalls, the  wastewater treatment plant outfall, the city of
Bronson stormwater discharge, and  two agricultural field outfalls  on the  north side of
the drain.

In 1983/1984 BPC dredged CD #30 from their most eastern outfall to the Matteson
Street overpass.  BPC reportedly contacted an unnamed waste hauler to remove the
dredged material. Within the same general time frame,  Branch County dredged CD
#30 from the Matteson Street overpass to the wastewater treatment plant outfall. This
dredged material was left stockpiled on the north bank of CD #30 and not removed.
BPC dredged CD #30 to improve its flow.

2.C.	History of Industrial Operations

2.C.1.    L.A. Darling - The L.A. Darling Company operated from the early 1900s until
1967. L.A. Darling manufactured display fixtures and retail shelving, which included
chromium and cadmium plating operations.  The company disposed of liquid wastes in
its own lagoons until 1939, at which time L.A. Darling was connected via an industrial
sewer line to the western lagoons operated by the city of Bronson. The location of the
L.A.  Darling lagoons was not identified during the Rl.

-------
LA Darling switched disposal to the eastern lagoons (via an industrial sewer line) in
1949 and continued to use these lagoons until 1967 when they ceased operations in
Bronson. The facility reportedly remained vacant from 1967 until 1983 when the city
bought the property from L.A. Darling for back taxes. As part of the purchase
agreement, L.A. Darling demolished the existing structures leaving only the foundations
in place.

2.C.2.    Douglas Components Corporation - H.A. Douglas began operating in  1910.
This company designed and manufactured automobile electrical parts. Metal plating
operations  were part of the manufacturing process which included cadmium, chromium,
silver, tin, and zinc.  At this time, the company was located at the southwest corner of
West Railroad and Matteson Streets. This plant was later referred to as Plant #1 when
a second plant was built in 1953.

In 1939 Plant #1 was connected to the western lagoons via the industrial sewer  pipe.
In 1940 H.A. Douglas Manufacturing merged with Kingston Products and became
Kingston Products-Douglas Division. In the late 1940s, Kingston Products-Douglas
Division manufactured automobile electrical products, military products including track
links and electrical switches, and consumer products including appliance timers  and
vacuum cleaners. In 1949 Plant #1 reportedly stopped discharging wastes to the
western lagoons and began discharging to the eastern lagoons via a separate sewer
pipe.

In 1951  a cyanide destruction facility (CDF), was constructed on State Street. At this
time, Plant  #1 reportedly stopped discharging to the eastern lagoons because
wastewater was being treated at the CDF and discharged directly to the storm sewers.
In 1960 Kingston Products-Douglas Division was sold to the Scott Fetzer Corporation,
Cleveland,  Ohio, which continued operations at Plant #1 as the Douglas Division of
Scott Fetzer.

The CDF operated until 1973.  Beginning in 1973 the Plant #1 plating processes
included zinc and  tin. Consequently, cyanide destruction processes ended and  the
facility was modified to remove metals and phosphate from the waste stream. In 1977
or 1978 the acid-tin process line was stopped, and in 1981 the alkaline-zinc process
line was stopped.

In January  1984 investors representing the Douglas Component Corporation bought
ilie Douglas Division from the Scott Fetzer Corporation.  By 1987 the zinc-phosphate
line stopped, which meant all plating at Plant #1 had ceased. According to employees
at the time  of the Rl, Plant #1 had been used for storage of equipment and supplies. In
1988 approximately 325 gallons of polychlorinated biphenyl (PCB) oil (from electric
transformers) were reportedly removed from the site by Great Lakes Environmental
Services, Inc.  No documentation was available to confirm this removal.
Douglas Division Plant #2, was built in 1953. This facility had a  paint line,  and
reportedly produced machined metal parts, but did not have any plating operations.

-------
2.C.3.    BRC - BRC began manufacturing fishing reels in 1922. BRC was originally
located at 123 North Matteson.  A new building was constructed at Douglas and State
Streets between 1920 and 1929.  BRC had a machine shop to make their own dies,
tools, and fixtures.  They also did their own plating and anodizing.  In 1945 BRC
stopped making reels and began making bomb parts.

BRC reportedly discharged liquid wastes to the western lagoons via the industrial sewer
pipe from  1939 until 1960. In 1963 BRC was purchased by Bronson Specialties.
Branson Specialties sold BRC in 1960 to True Temper, which moved operations to
Anderson, South Carolina. Successor companies at the BRC building reportedly
continued to use the industrial sewer through 1980 discharging small amounts of
nonplating wastes to the western lagoons.

2.C.4.    BPC - BPC. established in 1946, was originally located at West Matteson
Street and Railroad Street. In 1953 BPC moved its operation to their present location
at 135 Industrial Avenue.

BPC performs nickel and chrome plating, buffing, and polishing operations.  Liquid
wastes from BPC were reportedly discharged via the industrial sewer line to the
western lagoons from 1946 to 1949. After the first two eastern lagoons were
constructed in 1949, BPC switched over and discharged their waste to them.

In 1970 BPC purchased the eastern lagoons from the city of Bronson. Between 1970
and 1974, BPC expanded by constructing a building over three of the five eastern
lagoons.  BPC stopped using the eastern lagoons in 1981.

In 1988 BPC had expanded again, covering more of the eastern lagoons. Remnants of
the remaining two eastern lagoons, still visible, are overgrown with vegetation. BPC
currently discharges process wastewater to CD #30 via two outfalls under one National
Pollutant Discharge Elimination  System  (NPDES) permit.

2.C.5.    Bronson Specialties. Inc. - Bronson Specialties, Inc., located at 404 Union
Street, was established in 1956. Three divisions were identified: Bronson Plastics,
Bronson Tool, and Bronson Products. The building occupied by Bronson Specialties,
Inc. was built in the 1940s. Bronson Specialties, Inc. purchased the building in 1950.
Ownership history prior to Bronson Specialties, Inc. is unknown.

The Bronson  Plastics Division was formerly Bronson Fiberglass, which produced
fiberglass seats and front end parts for commercial trains.  Bronson Plastics Division
started blow-molding operations in the late 1960s, which continued until at least 1988.
They produced custom-molded  products including fuel tanks for pick-up trucks.
Bronson Plastics had used and  stored methyl ethyl ketone (MEK) as well as other
unknown chemicals at this location.

-------
 Bronson Tool Division began in 1956 as a tool and die shop. By 1988 they
 manufactured specialty machines. Degreaser chemicals were provided by Safety-
 Kleen, which supplied and disposed of the solvent.  It is not known when Safety-Kleen
 began providing this service. How Bronson Tool Division handled their degreaser
 chemicals prior to Safety-Kleen is unknown.

 Bronson Products Division operations included screw machines, casting machines, and
 a metal turning  shop.  The Bronson Products Division was sold to Bronson Precision
 Products in 1985. As of 1988 Bronson Precision Products continued to lease space
 from Bronson Specialties, Inc. who still owned the building and the land.
 Bronson Specialties,  Inc. purchased BRC in 1963.  In 1968 Bronson Specialties, Inc.
 sold BRC to True Temper. At that time True Temper moved BRC operations to South
 Carolina. Subsequent operations at the former BRC building are unknown.

 In 1974 acetone and  MEK (5 mg/L) were detected in a private well located at 442 Mill
 Street. The well is approximately 1,100 feet south of the western lagoons and 300 feet
 west of the access road to the city's wastewater treatment plant. During that time,
 construction dewatering wells were being used at the wastewater treatment plant
 located 800 feet northeast of the well.  Elevated levels of acetone and MEK (1 mg/L)
 were also detected in the dewatering wells.  Bronson Specialties was identified as a
 potential source of these contaminants because of their proximity to the contaminated
 well (approximately 200 feet south of the well). MEK was reportedly used by Bronson
 Fiberglass, and  drums of MEK were stored at Bronson Specialties.  As a result of the
 contamination detected, the  contaminated well was abandoned and the residence was
 connected to the city  of Bronson water supply in 1974. Subsequent studies conducted
 by the Michigan Department of Environmental  Quality* (MDEQ) have failed to confirm
the source of MEK found in the well.

Two investigations of groundwater and soils were conducted at Bronson Precision
 Products by WW Engineering & Science,  Inc. (1990) and EDI Science and Engineering,
 Inc. (1988). As  a result of these studies, a 250 ft x 200 ft x 5 ft deep area of
 contaminated soil was excavated and  disposed of by Bronson Specialties at a Type II
 Landfill (unnamed), as the soils were tested and determined at the time not to be
 hazardous.

 2.D.	Assessment and Enforcement Activities
 In 1978, the MDEQ installed six monitoring wells near the western lagoons.
 Groundwater sampling by the MDEQ in 1979 indicated detectable levels of
 iiichloroethylene (TCE) and  heavy metals. In addition, elevated concentrations of
 PCBs were detected  in sediment samples taken from CD #30 downstream of the
western lagoons.
•Note: On October 1, 1995 the environmental quality divisions were split from the Michigan Department of Natural Resources
and placed in the new Michigan Department of Environmental Quality.

-------
 In 1981 seven monitoring wells were installed in the vicinity of the eastern lagoons as
 part of Keck Consultants Hydrogeologic Study of the New (eastern) Lagoon Area. The
 investigation detected volatile organic compounds (VOC) and metals contamination in
 the groundwater.

 In 1984 the MDEQ sampled CD #30 and found heavy metal contamination downstream
 from the BPC. As a result,  in  1985 the BPC dredged CD #30 from its eastern outfall to
 the Matteson Street overpass, dewatered the sediment on-site, and had the dredged
 material removed.

 The United States Environmental Protection Agency (EPA) gave the site a hazard
 ranking score of 33.93 in June 1984 and the site was placed on the National Priorities
 List (NPL) in June 1986.

 In 1988 the MDEQ required Bronson Specialties, Inc. to test and remediate
 contaminated soil and groundwater around its facility.

 The EPA performed a site assessment of property located at 141 West Railroad Street
 on May 10, 1993.  The assessment revealed  numerous abandoned drums and vats of
 plating waste, acids, and caustic liquids. On March  10, 1994, the EPA issued an
 Administrative Order on  Consent to clean up surface contamination to the Universal
 Components Corporation.  Universal Components Corporation finished the cleanup on
August 21, 1995.

The MDEQ completed a Rl  of Operable Unit  I (OU 1) in September 1993 and a
 Feasibility Study (FS) for OU 1 in May 1995.  In July 1997 the MDEQ completed a FS
Addendum. This addendum updates the cleanup goals to reflect amendments to
 Michigan law in June 1995,  presents an additional groundwater remediation alternative
for the site, and identifies the industrial sewer as a potential source of contamination at
the site requiring further study.

The proposed plan for OU 1 was released for public comment on August 6, 1997.
3. HIGHLIGHTS OF COMMUNITY PARTICIPATION

MDEQ community relations activities for the site began soon after the site was put on the
NPL in June 1986. MDEQ personnel met with city officials and visited local
neighborhoods to informally brief the community about the site.  The MDEQ also
established the site information repository at the Bronson Library and created a mailing
list of interested parties.  In July 1989 the MDEQ ran a public notice in the Bronson
Journal. The notice, which ran for two weeks, updated the community on the RI/FS and
reminded all interested parties to add their names to the site mailing list by calling or
writing the MDEQ site project manager.

-------
 The MDEQ developed the Community Relations Plan for the site in August 1992. This
 plan identified community concerns, community relations objectives, and community
 relations activities to be conducted throughout the remedial action process.

 On June 15, 1995, the MDEQ hosted an informal public meeting to present results of the
 Rl and the FS. The MDEQ issued a fact sheet to provide the community with information
 regarding the status of the site. This meeting also explained the Superfund process and
 provided details of the upcoming investigations.

 In October 1995 a letter from the state project manager was sent to the residents
 updating them on recent changes in the site boundaries and the new cleanup rules
 pursuant to Part 201, Environmental Remediation, of the Natural Resources and
 Environmental Protection Act, 1994 PA 451, as amended (NREPA) and the need to
 amend the FS based on these changes.  On September 17,  1996, an informational
 meeting was held to inform the public of a new alternative being developed in the
 amended FS.

 In December 1996 the site was chosen by the EPA as a pilot for developing a Community
 Advisory Group (CAG). The CAG is an EPA public relations initiative designed to
 enhance community relation activities at Superfund sites. The CAG is a volunteer group
 of local citizens interested in the site.  This group sets its own priorities and agendas.  The
 agencies are there to assist in developing the organization and providing site information
 as requested by the CAG.

 On December 10, 1996, the EPA and the MDEQ conducted a CAG orientation briefing
 and a group was formed. To date the CAG has held five meetings of which the MDEQ
 attended four. The MDEQ  project manager presented to the group the site history, an
 outline of the Superfund process, and a review of the alternatives and the proposed plan
 developed for the site.

 The proposed plan was released to the public on August 6, 1997. The MDEQ completed
the site administrative record and made it available to the public in the information
 repository. The repository  is located at the Bronson Public Library, 207 N. Matteson
 Street, Branson, Michigan 49028. The Bronson Journal published the proposed plan on
August 7, 1997.  The proposed plan public comment period was from August 6, 1997 to
 September 8, 1997, and a  proposed plan public meeting was held on August 19, 1997.
4. SCOPE AND ROLE OF RESPONSE ACTION

The MDEQ has organized the cleanup into two discrete response actions or OUs. This
Record of Decision (ROD) addresses the first OU. OU 1 will address the eastern and
western lagoons, contaminated groundwater migrating from the lagoons, contaminated
sediment in CD #30, and exposure to area-wide contaminated groundwater. OU 2 will
address the industrial sewer and media impacted by releases from the industrial sewer.

-------
The threats to human health and the environment addressed by OU 1 are contaminated
soil and sludge in and around the lagoons, sediment in CD #30, and groundwater
impacted by contaminants in the lagoons venting to CD #30. OU  1 requires excavating
approximately 26,000 cubic yards of soil or sludge from the eastern lagoons, and
dredging approximately 2,000 cubic yards of sediment from CD #30.  This material will
be deposited into the western lagoons. The western lagoons will be covered with an
engineered soil cover to prevent exposure to the hazardous waste material, and a
French Drain will be installed between the western lagoon waste repository and CD #30
to capture contaminated groundwater before it vents to CD #30. The captured
groundwater will be treated in a wetland to be constructed in the vicinity of the western
lagoons. The treated water will be discharged from  the wetland to CD #30.

Addressing contaminated soil, sludge, sediment, surface water, and groundwater in
OU 1 will protect human health and the environment and is fully consistent with all
future site investigations and cleanup work including OU 2.  OU 2  will address the
industrial sewer and media impacted by releases from the industrial sewer, which
includes area-wide groundwater contamination.
5. NATURE AND EXTENT OF CONTAMINATION

5.A.	Summary
Contamination detected at the site is the result of industry operating practices since the
early 1900's.  Industries in the area include plating  operations, machine shops,
agricultural supply, bulk petroleum storage, and manufacturing plants. Contaminants
detected at the site were found in several media (soil, groundwater, surface water,
sediments, lagoon water, and lagoon sludge) at numerous locations, and varying
concentrations.  Contaminants  include TCE, 1,2-dichloroethylene (1,2-DCE), and vinyl
chloride (chlorinated VOCs);  PCBs; polyaromatic hydrocarbons (PAHs), arsenic,
antimony, barium, cadmium,  chromium, copper, nickel, and zinc (metals); nitrate-nitrite
and cyanide.  The primary locations, media, and contaminants are as follows:

      Area                    Media             Contaminant Group
Former Industrial Complex       Soil                    Metals

Former Industrial Complex       Groundwater            VOCs, Metals

Western Lagoon Area           Surface water           Metals, VOCs
                              Sludge                 Metals, VOCs
                              Soil                    Metals
                              Groundwater            Metals, VOCs

Eastern Lagoon Area           Soil                    Metals
                             ' Subsurface sludge       VOCs, PAHs,
                                                     PCBs, Metals

-------
                             Groundwater            VOCs, Metals

CD #30                      Surface Water          VOCs, Metals
                             Sediment               VOCs, PAHs
                                                    PCBs, Metals

5.A. 1     Chlorinated VOCs - TCE. 1,2-DCE, and vinyl chloride are the predominant
VOCs detected at the site. TCE is a common industrial solvent used for cleaning and
degreasing metal parts and machining equipment. TCE was in the waste streams of
most of the industrial facilities which discharged to the lagoons. 1,2-DCE and vinyl
chloride are the likely by-products of TCE as TCE breaks down in the environment. In
the groundwater TCE and related compounds are found at depth in the upper aquifer
and downgradient of known source locations at concentrations that exceed Maximum
Contaminant Levels (MCLs) or Residential Criteria pursuant to Part 201 of the NREPA.
TCE and vinyl chloride also exceed mixing zone-based groundwater/surface water
interface criteria pursuant to Part 201  of the NREPA at CD #30 (Figure 2).

5.A.2.    Metals - High metal concentrations were detected in subsurface soils, lagoon
berm soils, lagoon sludge, and groundwater at the eastern and western lagoons and
along the industrial sewer. The predominant metals detected (cadmium, total chromium,
Copper, lead, nickel, and zinc) are common to the plating industry as well as other
heavy industry. Cadmium was detected at hazardous concentrations pursuant to the
Resource Conservation and Recovery Act (RCRA), 1976 PL 94-580, as amended, in
lagoon sludge, and some subsurface  soils at the eastern lagoons.  In groundwater,
cadmium, nickel, lead, manganese, zinc, chromium, and cyanide were detected at
concentrations that exceed MCLs or Residential Drinking Water Criteria pursuant to
Part 201 of the NREPA near the lagoons or along the industrial sewer (Figures 3 & 4).

5.A.3.    PAHs and PCBs - PAHs were detected in soils and sludge at the eastern
lagoons, CD #30 sediment, and in soils at  L.A. Darling. PCBs were detected in CD #30
sediments downstream of the western lagoons, Swan Creek, and in the eastern lagoon
sludge. Based on an investigation conducted by EPA, the primary source of PAHs and
PCBs appears to be the Bronson storm sewer and not the lagoons. Apparently, PAHs
and PCBs have not migrated from site sludge, soil, or sediment. Therefore, PAH and
PCB contamination will not be used to define areas of CD #30 to be addressed by the
remedy. However, sediments dredged from CD #30 will likely contain PAHs and PCBs
and the potential presence of these compounds will be considered when selecting the
i  ..iedy.

5.A.4.    Source Areas  - The primary source(s) of VOCs in the groundwater appears to
be contaminated subsurface soils beneath the Scott  Fetzer and possibly the L.A.
Darling property. Contaminant concentrations in the groundwater in the upper aquifer
also indicate the potential presence of a Dense Nonaqueous Phase Liquid (DNAPL)

-------
^-r - =1 L -'--, -	—^!     fV0^°!L^   '" -


'     ^l/^^fr^^^-J'
          l.f.   tr^'t \
-------
                                                                                CADMIUM
                                                                                MANGANESE
                                                                                NICKEL

                                                                                CYANIDE
                                                                                SODIUM
CADMIUM
CYANIDE
LEAD
MANGANESE
NICKEL
ZINC
                                                                                           ALUMINUM
                                                                                           IRON
                                                                                           NICKEL
                                                                                           ZINC
                                                                                           CYANIDE
 70TAI
I CHROMIUM
  "
                                                                              OF fl*CKCflOUNf> Oft STANDARDS
                                                                               *nf*S •(THIN OASHCO LINCS  ,. COUO.A* Q»*OCttt| CWKtalKM tCltt.W 1M«XCH «,,,
                                                                               HAVK tClALS ANO/OR Ct»N|OE    >LtNOCH tfHKM H< fill «M FMI (F A tirwM't
                                                                               CONCtHlRMIONS IM CIt«0»NCE  (OOMiwiiw 
-------
                                                                            CADMIUM
                                                                            COPPER
                                                                            CHROMIUM
                                                                            CYANIDE
                                                                            LEAD
                                                                            ZINC
ARSENIC
CADMIUM
COBALT
COPPER
ANT IMONY
CYANIDE
LEAD
MANGANESE
NICKEL
Sll VtR
7 INC
                                     FIGURE
                          INORGANIC SOIL  CONTAMINATION
                                                                                    B     P5B    381!


                                                                                    srni r m rri t

-------
(e.g. TCE) beneath one or both of these facilities.  DNAPLs are heavier than water and
will sink to the bottom of the aquifer. Other VOC sources may exist within the site
boundaries.

The primary sources of metals at the site are lagoon sludge, surface and subsurface
soils, and the soils around and below the industrial sewer.

5.B.      Area Specific Overview of Site Contamination
The site was divided into five subareas of interest identified during the Rl. These are
shown on Figure 5 and include:

•  L.A. Darling
•  Scott Fetzer
•  The Industrial Sewer
•  The Eastern and Western Lagoons
•  CD #30

These subareas were identified based on physical features present, the distribution of
contaminants, and groundwaterflow direction at the site.

5 81.    The L.A. Darling Subarea - TCE and 1,2-DCE were detected at relatively high
concentrations in wells in and downgradient of the L.A. Darling Subarea. The
concentration of TCE in the groundwater indicates the L.A. Dai ling Subarea is a
possible source of VOCs at the site.  In addition, high concentrations of PAH
compounds were detected in soils near the surface at the  L.A. Darling Subarea.
Cadmium, chromium, copper, mercury, zinc, and cyanide were the metals detected
most frequently above  background concentrations in soils.

5.B.2.    The Scott Fetzer Subarea - TCE, 1,2-DCE, and  1,1,1-Trichloroethane were
detected in soils at the Scott Fetzer Subarea; however, most compounds were detected
in samples collected from below the water table. TCE, 1,2-DCE, and vinyl chloride
concentrations in Monitoring Well 20 represented the highest concentrations detected
in groundwater at any location at the site. The Scott Fetzer Subarea is a potential
source area for VOCs at the site.  While metals in  groundwater at the Scott Fetzer
Subarea did not exceed Residential Criteria pursuant to Part 201 of the NREPA,
several were detected  in soils and groundwater above background levels.

5.B.3    The Abandoned Industrial Sewer- Relatively high concentrations of TCE,
1,2-DCE, vinyl chloride, and metals were detected in subsurface soils and in the
groundwater along the route of the abandoned industrial sewer pipe. The
contamination detected in these areas is likely due to a  combination of sources, but
primarily from leaks in the industrial sewer pipe.

-------
north
                 SCALE IN FFEt

-------
5.B.4.    The Eastern and Western Lagoons - There were many VOCs, SVOCs,
pesticides, and PCBs detected in soils and sludge at the eastern lagoons, but
chlorinated ethene (TCE, 1,2-DCE, and vinyl chloride) compounds and bis(2-ethylhexyl)
phthalate were the only organic compounds detected in groundwater at the eastern
lagoons. Although chlorinated ethene compounds were not detected in soils or eastern
lagoon sludge from the two accessible lagoons, it is possible the chlorinated ethene
compounds were in the waste stream deposited in the three inaccessible lagoons
because known users of these compounds (DCC Plant #2, L.A. Darling, and BPC)
discharged to them.

High concentrations of TCE,  1,2-DCE, and vinyl chloride were detected in groundwater
wells at and downgradient of the western lagoons, and in the immediate vicinity of the
eastern lagoons. The same chlorinated ethenes detected in groundwater at the
western lagoons were also detected in the western lagoon sludge. While the western
lagoons are a likely source of VOCs in the groundwater, it is also likely that similar
contaminants from the Scott Fetzer Subarea, the L.A. Darling Subarea, the abandoned
industrial sewer line, DCC Plant #2, Bronson Precision Products, and possibly Branson
Specialties, are migrating in the groundwater to the downgradient eastern and western
lagoons.

High concentrations of metals were also detected in lagoon sludge, subsurface soils,
and groundwater at both the eastern and western lagoons. Metals appear to have
migrated downward and horizontally in the soil and with the flow of groundwater.  Wells
in the immediate vicinity of the eastern and western lagoons show metal concentrations
in excess of Residential Drinking Water Criteria pursuant to Part 201 of the NREPA.

5 B.5.    CD #30 - Numerous organic compounds were detected in CD #30 surface
water but most compounds were detected at relatively low concentrations and no
organic compounds exceeded Ambient Water Quality Criteria (AWQC).  Contaminants
are entering CD #30 via the storm sewer outfall (OF5), the BPC Outfall (OF1), and
groundwater discharge. Surface water runoff from the agricultural fields and land
adjacent to CD #30 may also be impacting surface water and sediments in CD #30.

Cadmium and mercury are entering CD #30 surface water via outfalls OF5 and OF1 at
levels above AWQC. Cadmium at 3.3 ug/L from OF5 and mercury at 0.27 ug/L from
OF1. The remaining metals detected  in surface water in exceedance of AWQC are
  •ributable to releases from contaminated sediments in CD #30 and groundwater
discharging to CD #30.

Relatively high concentrations of PAHs, PCBs, and metals were detected in  CD #30
sediments. Arsenic, cadmium, and PCBs exceeded Residential Direct Contact Criteria
pursuant to Part 201 of the NREPA. The PAHs, PCBs, and metals were detected at
greatest concentrations adjacent to, and downstream of, the western lagoons. PCBs
and metals were also detected in Swan Creek. The metal contamination is likely
                                                                           !7

-------
attributable to the site. PCBs were not detected in western lagoon sludge samples but
were detected in subsurface soils and sludge at the eastern lagoon.  The major source
of PCBs detected in CD #30 and Swan Creek is, or was most likely, the Bronson storm
sewer or surface water runoff from the area.
5.C.	Fate and Transport of Contaminants
At this time, conditions remain favorable for contaminant releases by infiltration and
percolation of precipitation through the relatively porous sandy soils at the site. Once in
the upper aquifer, contaminant transport is driven by horizontal and vertical gradients.
The upper aquifer is a relatively permeable sand and gravel mix. An aquitard of silty
sand and clay appears to divide the aquifer into upper and lower regions. This aquitard
appears to be continuous across the site and between 17 feet and 50 feet thick (based
on residential well logs, on-site borings, and the Hydrogeologic Atlas of Michigan
[1981]). However, due to the large (220-acre) size of and limited data available
regarding the aquitard, its continuity and thickness cannot be stated with certainty. The
aquitard has relatively low permeability and, if it is continuous, serves as a barrier to the
downward migration of contaminants  in the upper aquifer. However, there are no wells
in the lower aquifer located at or downgradient of the source areas to confirm this
assumption.

Contaminants from the L.A. Darling Subarea, the Scott Fetzer Subarea, the eastern
lagoons, and the western lagoons are migrating from sources in subsurface soils
(possibly a DNAPL) and sludge from these areas. Other unidentified source  areas may
exist along the industrial sewer pipe.

TCE, 1,2-DCE, and vinyl chloride are the most mobile contaminants present and are
likely to migrate the furthest from the source areas regardless of the media they are in
(soils, sediments, sludge, or groundwater). TCE, 1,2-DCE, and vinyl chloride have mid
to high range solubility (relative to metals and PCBs), low octanol/water coefficient
values, and low retardation factors. The high migration potential for VOCs in
groundwater is confirmed by the high concentrations of chlorinated organic compounds
found in downgradient wells and wells screened at the top of the aquitard at the site.
Metals are also migrating in groundwater.  However, due to the relatively low solubility
of metals in groundwater they have migrated to a lesser extent than the VOCs.

Contaminated groundwater is discharging directly to CD #30.  Contaminated
groundwater is also being intercepted by the Bronson storm sewer which flows into CD
#30. Once contaminants are in CD #30, the VOCs are volatilized directly into the air
and metals likely precipitate out into the sediment.
6. SUMMARY OF SITE RISKS

The MDEQ conducted a Human Health and Environmental Risk Assessment to
determine how contaminants detected at the site may affect human health or the
environment.  The risk assessment compared contaminant levels found at the site to

-------
state and federal standards or toxicity guidelines; considered how people, animals, or
plants could be exposed to the contamination; and evaluated whether these
contaminants posed a threat to human health or the environment.  Refer to the Baseline
Risk Assessment or Tables 1-4 and 1-5 of the FS for detailed risk estimates.
The MDEQ conducted this risk assessment following EPA guidance including "Risk
Assessment Guidance for Superfund: VolumQ I Human Health Evaluation" (U.S. EPA
1989a), and "Risk Assessment Guidance for Superfund: Volume II Environmental
Evaluation Manual" (U.S. EPA, 1989b), and where appropriate, State of Michigan Risk
Assessment Guidelines. These documents provide the methodology and standard
assumptions used for evaluating risk and developing appropriate cleanup standards.

6.A.     Human Health
Human health risks are quantified by calculating the noncancer and the cancer risk
factors for each chemical detected at the site. For noncancer risks, the contaminant
concentration detected on-site must not exceed a reference dose concentration for that
chemical. Numerically, this comparison is expressed as the hazard quotient (HQ) for the
chemical or for multiple contaminants the hazard index (HI). An HQ or HI greater than
1.00 represents an unacceptable health risk.

The acceptable risk range for cancer causing chemicals established by the EPA is no
more than one additional case of cancer for every 10,000 to 1,000,000 people exposed
(CR =1x10-4 to 1x10-6). The MDEQ manages cancer risk to no more than one
additional case of cancer for every 100,000 people exposed to a chemical (CR = 1x10-5).

6.A. 1.    Western Lagoon Area - Risks were estimated for trespassers exposed to
contaminants detected within the western lagoon area. Trespassers were assumed to be
exposed to contaminated sludge, surface water, and air. Under these conditions, the
western lagoon area presents both a noncarcinogenic and a carcinogenic health hazard.
The majority of the noncancer risk (Hl=6) is from skin contact with cadmium and
chromium contaminated sludge. The majority of the cancer risk (CR=5X10-6) is from the
ingestion of arsenic in surface water and sludge.

6.A.2.    Eastern Lagoon Area - Risks were estimated for trespassers exposed to
contaminants detected within the eastern lagoon area. Trespassers were assumed to be
exposed to contaminated surface soil.  Under these conditions tne eastern lagoon area
appears to pose a noncancer health concern. The majority of the noncancer risk (Hl=20)
is from direct contact with the skin and the incidental ingestion of antimony, chromium,
and nickel.

6.A.3.    CD #30 - Risks were quantified for children playing in CD #30 and  residents
living near CD #30.  Children who wade in CD #30 are assumed to be exposed to
contaminated surface water, sediment, and organic vapors in the air.  Residents are
potentially exposed to VOC vapors in the air. Under these conditions there is a cancer
risk to children exposed to sediment and residents exposed to volatile chlorinated
organics. The majority of cancer risk (CR=1X10-5) to children playing in CD  #30 was
                                                                              19

-------
associated with children eating sediment contaminated with arsenic. The majority of
cancer risk (CR=2X10-5) to residents living near CD #30 is associated with residents
inhaling vinyl chloride.

6.A.4.     Groundwater - The most concentrated portion of the chlorinated organic plume
lies below the industrial area near the former Scott Fetzer and L.A. Darling properties.
The organic  plume generally decreases in concentration as it flows west and north toward
CD #30.  Risks were quantified for residents assuming that they will use the contaminated
shallow groundwater for their drinking water supply in the future. Health risks were
developed separately for groundwater consumption and exposure to groundwater
contaminants through skin contact and inhalation while showering.  Based on the
concentration of contaminants in the groundwater. residential use would pose a
noncancer (Hl=60) and cancer (CR=2X10-1) risk to future residents. The noncancer risk
was associated with ingestion of 1,2-DCE. The majority of the cancer risk is associated
with the ingestion of vinyl chloride in the groundwater.

6.B.      Ecological Concerns
Currently, there is no available documentation that suggests protected or endangered
species are present within the area of the site.

6.B.1.     Terrestrial Ecosystem Plants and Animals -  Signs of stressed vegetation were
observed along the berms surrounding the western lagoons. Also, the diversity of plant
species along the banks of the western lagoons appeared  low. Adverse effects on
terrestrial animals in the CD #30 area or the western lagoon area were  not observed.
However, without a thorough terrestrial survey or conducting bioassays on contaminated
media, conclusions could not be drawn concerning adverse health effects on terrestrial
species or their habitats in these areas.

6.B.2.     Aquatic Ecosystem Plants and Animals - Based  on the concentrations of
contaminants in surface water, sediments, and sludge from either CD #30 or the western
lagoons, sensitive aquatic species may be harmed or likely have been eliminated from
these surface water bodies.

The MDEQ evaluated ecological risks to CD #30 by comparing the concentrations of site-
related contaminants in CD #30 surface water and sediment to EPA and MDEQ criteria
and guidance documents if agency standards were not available.

Impacts to CD  #30 surface water were evaluated against EPA, AWQC, and MDEQ
Groundwater/Surface Water Interface (GSI) criteria. Several VOCs or metals were
detected in CD #30 surface water or in groundwater discharging to the drain at levels
above AWQC or MDEQ-GSI values. Metals exceeding AWQC are cadmium, copper,
lead, selenium, cyanide, and hexavalent chromium. Metals and organic contaminants
that exceed MDEQ-GSI criteria are cadmium, lead, nickel, zinc, cyanide, vinyl chloride,
and TCE.
                                                                              20

-------
CD #30 sediment was evaluated by comparing contaminant concentrations found in CD
#30 to two sediment guidance documents and background conditions. The guidance
documents are the Guidelines for the Protection and Management of Aquatic Sediment
Quality in Ontario published by the Ontario Ministry of the Environment and The Potential
for Biological Effects of Sediment-Sorbed Contaminants Tested in the National Status
and Trends Program published by the National Oceanographic and Atmospheric
Administration in Technical Memorandum NOS ONA 52.  Background  levels were used if
they were higher than the lowest impact level established by either guidance, but did not
exceed the severe impact level quantified in the Ontario guidelines.

6.B.3    Risk Summary Statement - Actual or threatened releases of hazardous
substances from this site, if not addressed by implementing the response action
selected in this ROD, may  present an imminent and substantial endangerment to public
health, welfare, or the environment.
7. CLEANUP GOALS

Cleanup goals identified for each chemical of concern are based on the environmental
media, the exposure pathway, the potential receptor(s), the risk associated with the
exposure, and the use and zoning of the impacted property.

7.A.      Soil or Sludge
Soil or sludge cleanup goals (Table 1) for each contaminant of concern are based on
MDEQ health-based direct contact values or values that protect ground-water quality.
MDEQ-approved leach tests may also be used to demonstrate compliance with soil or
sludge criteria protective of groundwater.  To protect against the runoff of contaminants
into CD #30, background levels have been identified as cleanup goals for surface soils
close (i.e., the 10 year flood plain) to the drain.

7.B.      CD #30 Sediment
CD #30 sediment cleanup goals (Table 2) for each contaminant of concern are based
on MDEQ health-based direct contact values, values identified in "To Be Considered"
guidance documents that protect the quality of sediments, or back-ground levels.

7.C.	Groundwater
Groundwater cleanup goals (Table 3) for  each chemical of concern  are based on the
point of compliance. MCLs are the  goals for contaminated groundwater within or at the
site boundaries.  MDEQ groundwater surface water interface criteria are the cleanup
goals for contaminated groundwater discharging to CD #30.
                                                                            21

-------
TABLE 1
NORTH BRONSON LAGOON SOIL, AND SLUDGE CLEANUP GOALS
Chemical
Antimony
Arsenic
Barium
Cadmium
Chromium VI
Copper
Lead
Mercury
Nickel
Selenium
Silver
Vanadium
Zinc
Cyanide
Average EPC (ug/kg)
600,000
14.000
2,200.000
2,500.000
9000000*
2.500,000
1,100,000
81
38,000,000
1,000
28.000
230,000
2,600,000
2,600,000
Pathway
GSI
Soil to Surface Water
GSI
Direct Contact
Soil to Surface Water
GSI
Soil to Surface Water
GSI
Soil to Surface Water
GSI
Soil to Surface Water
GSI
Soil to Surface Water
GSI
Soil to Surface Water
Soil to Surface Water
GSI
GSI
Soil to Surface Water
GSI
GSI
Soil to Surface Water
GSI
Soil to Surface Water
GSI
Soil to Surface Water
GSI
Soil to Surface Water
Goal (ug/kg)
36.000
7000
70,000
6,600.
6,000
130,000
85,000
4,300
1,200
3,300
7000
4,000,000
32,000
1,000
21,000
130
170
88,000
20,000
400
67
1000
130,000
41,000
190,000
72,000
100
400
Reference or Guidance
MDEQGSI
BACKGROUND
MDEQ GSI
MDEQ DCV
BACKGROUND
MDEQ GSI
BACKGROUND
MDEQ GSI SWP
BACKGROUND
MDEQ GSI SWP
BACKGROUND
MDEQ GSI
BACKGROUND
MDEQ GSI
BACKGROUND
BACKGROUND
MDEQ GSI
MDEQ GSI
BACKGROUND
MDEQ GSI
MDEQ GSI
BACKGROUND
MDEQ GSI
BACKGROUND
MDEQ GSI
BACKGROUND
MDEQ GSI
BACKGROUND
        EPC - Exposure Point Concentration             DCV - Direct Contact Value

        GSI - Groundwater to Surface Water Interface
EPC = Total Chromium
10
I.J

-------
Table 2
Determination of North Bronson County Drain #30 Sediment Cleanup Goals (ug/kg)
Chemical of Concern
Antimony
Arsenic
Barium
Cadmium
Total Chrom
Copper
Lead
Manganese
Mercury
Nickel
Silver
Vanadium
Zinc
Cyanide
PAH (total)
Exposure
Point
Concentration.
5,000
23,000
230,000
200,000
1,900,000
; 4,500,000
510,000
330,000
130
1,200,000
7,500
30,000
770,000
9,400
15,000
Cleanup
Goal
2,000
6,600
10,000
5,000
80,000
70,000
35,000
97,000
200
30,000
1,000
5,400
120,000
100
4,000
Reference or Guidance
NOAA Exposure Risk-Low
Part 201 Residential DCV
Background
NOAA Exposure Risk-Low
NOAA Exposure Risk-Low
NOAA Exposure Risk-Low
NOAA Exposure Risk-Low
Background
Ontario Lowest Effect Level
NOAA Exposure Risk-Low
NOAA Exposure Risk-Low
Background
Ontario Lowest Effect Level
Ontario Lowest Effect Level
Ontario Lowest Effect Level
NOAA - National Oceanic and Atmospheric Administration

DCV - MDEQ Direct Contact Value

PAH - Polynuclear Aromatic Hydrocarbon (total) is the sum of 16 PAH compounds: Acenaphthene, Acenaphthylene, Anthracene,
Benzo(k)fluoranthene, Benzo(b)fluorene, Benzo(a)anthracene, Benzo(a)pyrene, Benzo(g,h,i)perylene, Chrysene, Dibenzo(a,h,)anthracene,
Fluoranthene, Fluorene, Indeno(l,2,3-cd)pyrene, Naphthalene, Phenanthrene and pyrene.

-------
TABLE 3
NORTH BRONSON LAGOON GROUNDWATER CLEANUP GOALS
Chemical
Cadmium
Chromium
Lead
Mercury
Nickel
Silver
Zinc
Cyanide
Nitrate* Nitrite
Trichloroethylene
cis 1.2DCE
Vinyl Chloride
Average EPC (ug/kg)
70
30
3
1
550
2
5.000
1,000
300.000
450
600
60
Risk
GSI
Site Boundry
GSI
GSI
Site Boundry
GSI
Site Boundry
GSI
Site Boundry
GSI
Site Boundry
GSI
Site Boundry
GSI
Site Boundry
GSI
Site Boundry
GSI
Site Boundry
GSI
Site Boundry
GSI
Site Boundry
Indoor Inhalation
Groundwater Contact
Goal (ug/kg)
6.2*
5
11#
NA
4
1
1
168'
100
4
34
382*
2.400
20
200
NA
10,000
200
5
410
70
15
2
110
290
Reference or Guidance
MDEQ GSI
MDEQ DWV
MDEQ GSI
MDEQ GSI
MDEQ DWV
MDEQ GSI
MDEQ DWV
MDEQ GSI
MDEQ DWV
MDEQ GSI
MDEQ DWV
MDEQ GSI
MDEQ DWV
MDEQ GSI
MDEQ DWV
MDEQ GSI
MDEQ DWV
MDEQ GSI
BACKGROUND
MDEQ GSI
MDEQ DWV
MDEQ GSI
MDEQ DWV
MDEQ GW INDOOR AIR
MDEQ GW CONTACT
NA - Not applicable
EPC - Exposure Point Concentration
GSI - Groundwater Surface Water Interface
cis 1,2 DCE - cis 1,2 Dichloroethylene
DWV - Drinking Water Value
*  Final Chronic Value @ 400 mg CaCO3/L
# Based on Chromium VI

-------
8.    DESCRIPTION OF REMEDIAL ALTERNATIVES

Based on the results of the Rl and the Risk Assessment, the MDEQ conducted an FS to
identify, develop, and evaluate alternatives for reducing risks to human health and the
environment. During the FS the MDEQ identified and screened potential remedial
technologies appropriate for the site.  Applicable technologies were assembled into area-
specific and site-wide alternatives to address contamination problems. These alternatives
were then screened on the basis of their effectiveness, implementability, and cost. Once
this initial screening was completed, a detailed analysis was conducted on a limited
number of alternatives that represented possible options to remediation.  The detailed
analysis consisted of evaluating the individual alternatives against nine evaluation
criteria.  This analysis is presented in Section 9.

8.A.	Area-Specific Alternatives
Specific alternatives were developed in the FS for each area of concern (AOC) identified
in the Rl. The areas of concern were identified as the Eastern Lagoons (EL), Eastern
Lagoon  .Groundwater (ELG), Western Lagoons (WL), Western Lagoon Groundwater
(WLG), and CD #30.  Refer to Section 4 of the FS for the detailed nine criteria analysis of
each area-specific alternative. A summary of these alternatives and their cost is provided
below.

8.A. 1.    No Action Alternatives (WL-1. WLG-1. EL-1. ELG-1 and CD-1) - The Superfund
program requires that a "no action" option be considered at every site. Under a no action
remedy the site would remain as it is today.  This option is used as the benchmark for
comparing and evaluating the effectiveness of all other alternatives.

The costs associated with a no action alternative are those related to the five year
reviews  and groundwater monitoring. Thirty year present worth estimates are $10,000 for
reviews  and $500,000 for groundwater monitoring.  However, a no action remedy does
not meet the cleanup objectives for the site, and would allow a continued unacceptable
risk to human health and the environment.

8.A.2.    WL Area Alternatives

a. Alternative WL-2: Type III Landfill Area Cap
WL-2 requires constructing a cap over the WL area. The purpose of the cap is to cover
the waste to prevent exposures, and to stop rainwater from infiltrating and leaching
  ntaminants into the groundwater.  The cap, however, will not prevent the leaching of
contaminants into the groundwater from waste deposited below the water table.
Capital Costs: $1,550,000       O & M: $5000     Present Worth: $1,600,000

b. Alternative WL-3: Soil Fixation
The intent of soil fixation is to slow the release of contaminants into the environment.
This process involves a deep soil mixing technique that directly applies stabilizing agents
to the soils.  These agents are designed to reduce the mobility of the contaminants. An

                                                                               25

-------
area cap would also be required to prevent exposures and to reduce the infiltration of
rainwater.
Capital Costs: $11,900,000      0 & M: $40,000    Present Worth:  $12,400,000

c. Alternative WL-4: Excavation With Treatment
The intent of excavation with treatment is to prevent exposure and the release of WL
contaminants to the environment by removing, treating, and properly disposing
contaminated sludge and soil.
Capital Costs: $52,300,000      0 & M: $0         Present Worth:  $52,300,000

8.A.3.    WLG

a. Alternative WLG-2:  Groundwater Pumping and Treatment
The intent of groundwater pumping is to capture and treat contaminated groundwater
before it migrates from the site. This prevents the movement of contaminants into the
surrounding environment.  Pumped groundwater would be treated by chemical oxidation,
precipitation/flocculation, and ion exchange process.  Treated groundwater would be
discharged to CD #30.
Capital Costs: $2,300,000        O & M: $170,000   Present Worth:  $4,400,000

b. Alternative WLG-3:  Containment By Slurry Wall, Groundwater Pumping, and
Treatment
The intent of this alternative is to prevent the movement of contaminants via the
groundwater by surrounding the lagoons with a subsurface wall.  The wall would create a
cell isolating the contaminants from the environment.  Groundwater seeping into the cell
would be pumped out and treated  before discharging it to CD #30.  Pumped groundwater
would be treated by chemical oxidation, precipitation/flocculation, and ion exchange
process.  This alternative would not prevent groundwater contaminated  by sources
upgradient from the lagoons from moving around the cell and discharging to CD #30.
Capital Costs: $1,600,000        O & M: $100,000   Present Worth:  $2,800,000

8.A.4    EL Area

a. Alternative EL-2: Area Cap
EL-2 requires the construction of a cap over the EL area.  The purpose  of the cap is to
prevent direct contact to eastern lagoon contaminants and to slow the leaching of
contaminants into the groundwater by preventing the infiltration of rainwater.  The cap,
however, will not prevent the leaching of contaminants into the groundwater from waste
that is below the water table.
Capital Costs: $790,000         O&M: $5,000     Present Worth:  $850,000

b. Alternative EL-3: Soil Fixation
The intent of soil fixation is to slow the movement of contaminants into the groundwater.
This process involves a deep soil mixing technique that directly applies  stabilizing agents
to the soils. These agents are designed to reduce the mobility of the contaminants. An
                                                                              26

-------
area cap would also be required to prevent exposures and to reduce the infiltration of
rainwater.
Capital Costs: $2,900,000       O & M: $40,000   Present Worth: $3,400,000

c. Alternative EL-4: Source Removal, Treatment, and Disposal
The intent of excavation and treatment is to prevent direct contact exposure and the
movement of contaminants into the surrounding environment by removing, treating, and
properly disposing of contaminated sludge and soil.
Capital Costs: $10,400,000      O & M: $5,000     Present Worth: $10,400,000

8.A.5     ELG

a. Alternative ELG-2:  Groundwater Pumping and Treatment
The intent of groundwater pumping is to capture and treat contaminated groundwater
before it migrates from the site.  This prevents the movement of contaminants into the
surrounding environment. Pumped groundwater would be treated by chemical oxidation,
precipitation/flocculation, and ion exchange process. Treated groundwater would be
discharged to CD #30.
Capital Costs:  $1,700,000       O & M: $125,000   Present Worth: $3,250,000

b. Alternative ELG-3:  Containment Wall. Groundwater Pumping, and Treatment
The intent of this alternative is to isolate the contaminants beneath the BPC building by
surrounding the building with a subsurface containment wall.  Groundwater would be
pumped from within the contained area and treated prior to discharge to CD #30.
Pumped groundwater would be treated by chemical oxidation, precipitation/flocculation,
and ion exchange process.
Capital Costs:  $2,900,000       O&M: $90,000    Present Worth: $4,000,000

c. Alternative ELG-4:  Containment Wall, Slurry Wall. Groundwater Pumping, and
Treatment
The intent of this alternative is to isolate the contaminants beneath the BPC building with
a containment wall and to build a slurry wall around the remaining lagoons. Groundwater
would be pumped from within the containment and slurry walls and treated to remove
contaminants prior to discharge to CD #30. Pumped groundwater would be treated by
chemical oxidation, precipitation/flocculation, and ion exchange process.
Capital Costs:  $2,600,000       O & M: $85,000   Present Worth: $3,700,000

3 A.6.     CD #30

a. Alternative CD-2: Access Restrictions and  Monitoring
The intent of access restrictions and monitoring is to prevent exposure to contaminants in
CD #30 by institutionally controlling access to the drain.
Capital Costs:  $300,000         O&M: $45,000         Present Worth: $860,000
                                                                              27

-------
b. Alternative CD-3: Partial Sediment Dredging and Treatment
The intent of partial sediment dredging is to reduce exposure to contaminants and the
movement of contaminants into the surrounding environment by removing and treating
contaminated sediments from the drain near the lagoon areas.
Capital Costs:  $500,000         O & M: $45,000          Present Worth:  $600,000

c. Alternative CD-4: Full Sediment Dredging and Treatment
The intent of full sediment dredging and treatment is to prevent exposure and movement
of contaminants into the surrounding environment by removing and treating contaminated
sediment from the entire length of CD #30.
Capital Costs:  $2,000,000       O&M: $45,000    Present Worth: $2,600,000

d. Alternative CD-5: Sediment Dredging with Channeling
This alternative would only redirect the path of groundwater and would spread the
contamination downstream.  This alternative was eliminated as a possible option.

e. Alternative CD-6: Full Sediment Dredging and Treatment/French Drain Along
Selected Areas
The intent of this alternative is to prevent exposure to contaminated sediment and prevent
the movement of contaminated groundwater into CD #30. To accomplish the goals of this
alternative the entire length of the drain would be dredged. Also, contaminated
groundwater emanating from the lagoon areas would be intercepted by a French Drain
and treated before it could enter CD #30 and recontaminate that portion of the  county
drain.
Capital Costs: $3,600,000       O & M: $45,000    Present Worth: $4,200,000

f. Alternative CD-7:  Full Sediment Dredging and Full French Drain
The intent of this alternative is to prevent exposure to contaminated sediment and the
movement of contaminated groundwater into the environment. To accomplish the goals
of this alternative the entire length of the drain would be dredged. Also, contaminated
groundwater along the entire length of the drain would be intercepted by the French Drain
before it could enter CD #30 and recontaminate the drain.
Capital Costs: $8,300,000       O&M: $45,000    Present Worth: $8,900,000

8.B.	Site-wide Alternatives
To develop a comprehensive site-wide remedy that addresses OU 1, area-specific
alternatives  or components of the area-specific alternatives were assembled  into
potential site-wide alternatives. The detailed analysis of the area-specific alternatives
described above and in the FS and the constructed wetland  presented in the FS and FS
addendum served as the basis for screening and assessing the site-wide alternatives.
Many of the  site-wide alternatives developed require the movement and consolidation of
contaminated material.  Because some of these activities may constitute disposal or
placement of hazardous waste, several of the site-wide alternatives may trigger a number
of significant requirements under the provisions of Subtitle C (Hazardous Waste
Regulations) of RCRA.  This is further discussed below.

-------
8.B.1.     RCRA Subtitle C Determination - Subtitle C requirements for the treatment,
storage, and disposal of hazardous waste apply to a Superfund remedial action if the
waste is a RCRA hazardous waste and either of the following conditions are met:

1.  The hazardous waste was initially treated, stored,  or disposed of after the effective
   date of the particular RCRA requirement.

2.  The activity at the Comprehensive Environmental  Response, Compensation, and
   Liability Act (CERCLA), 1980 PL 96-510, site constitutes the treatment, storage, or
   disposal of hazardous waste as defined by RCRA.

A solid waste becomes a hazardous waste when it meets the listing description on any of
the four lists of hazardous waste under RCRA, or for mixtures of listed and solid wastes,
when the listed waste is first added to the solid waste, or when the waste exhibits any one
of the four characteristics of hazardous waste (i.e., ignitability, corrosivity, reactivity, or
Extraction Procedure (EP) Toxicity).

Waste  characterization established that lagoon sludge exhibits the characteristic of EP
toxicity for cadmium. The waste is, therefore, a hazardous waste. In addition, the
lagoon sludge appears to be a listed hazardous waste under 40 CFR 261.31.
Wastewater treatment sludges from electroplating operations are generally designated
F006 on the list of hazardous waste from nonspecific sources.

RCRA or specific requirements under RCRA will apply if the hazardous waste was
treated, stored, or disposed of after the effective date  of RCRA or the requirement.
RCRA became effective in November 1980. The North  Bronson waste disposal records
indicate that no waste was disposed of on or after the effective date of RCRA.  Therefore,
RCRA regulations do not apply to waste deposited on-site before that date unless the
CERCLA corrective action itself constitutes treatment, storage, or disposal.

Many of the site-wide alternatives developed for the North Bronson site require the
treatment, movement, or consolidation of contaminated  material. Disposal in particular
triggers a number of significant requirements, including land disposal restrictions and
closure requirements.  The EPA has determined that disposal occurs when hazardous
wastes are placed in a land based unit. However, movement within a unit does not
constitute disposal, and at a  Superfund site, an area of contamination can be considered
to be comparable to a land based unit.  At this site, the area includes the WLs, ELs,
     "D#30.  Therefore, the movement of waste within this area does not constitute
placement. Accordingly, site-wide remedies that require the movement of waste within
the AOC will not trigger land  disposal restrictions or closure requirements.

Therefore, although the waste is hazardous, RCRA Subtitle C requirements are not
applicable because neither of the additional conditions of applicability are met.  However,
because the waste is hazardous and because some of the remedial activities proposed to
                                                                              29

-------
address the waste may constitute treatment, storage, or disposal, Subtitle C requirements
are potentially relevant and appropriate.

Only those requirements found to be both relevant and appropriate are ARARs. A RCRA
requirement may be relevant but not appropriate under certain site conditions.  Moreover,
it is possible for a  portion of a requirement to be relevant and appropriate while other
parts may not. However, once a requirement or part of a requirement is found to be
relevant and appropriate it must be fully complied with or waived.

Land disposal restrictions (LDRs) and closure requirements under Subtitle C may be
relevant and appropriate for activities involving the treatment, storage, or disposal of
hazardous wastes at a Superfund site.

LDRs require hazardous waste to be treated prior to the disposal of the material on land.
However, the minimum treatment technology required under LDR's is not appropriate for
a CERCLA corrective action that leaves a majority of the waste in place below the water
table. There is no practicable technology for achieving direct treatment and reduction of
mobility in'such a  case.  Instead, the CERCLA action addresses the contamination
through containment and treatment of impacted groundwater. Therefore, LDRs are
relevant but not appropriate for remedial alternatives requiring the on-site containment of
waste material below the water table in  pre-existing lagoons.

Depending on the  site  circumstances and the remedy selected, either clean closure,
landfill closure, or  a combination of both may be used when closure requirements are
relevant and appropriate. Clean closure standards assume there will be unrestricted use
of the site  and require  no maintenance after the closure has been completed.  In contrast,
disposal or landfill  closure standards require post-closure care and maintenance of the
unit for at least 30 years after closure and final covers.

A combination or hybrid closure allows more flexibility in designing closures to address
site specific problems.  Hybrid closures  occur when certain requirements in the closure
standards are physically or economically unattainable, or when only certain  requirements
are relevant and appropriate. For example, landfill closures require that the disposal unit
be capped with a final  Type C or impermeable cover to minimize the impact of leachate
on the groundwater. While this requirement may be relevant to the site, it is not
appropriate for remedies that leave most of the waste in place below the water table.

Therefore, a hybrid-landfill closure will be used at the site for remedies that leave most of
the contamination in place below the water table.  The hybrid landfill closure will consist
of:

•  Covers or caps to:
      1. Address direct contact threats
      2. Minimize maintenance requirements
      3. Promote channelage and minimize erosion


                                                                               30

-------
      4. Accommodate settling and subsidence
•  Institutional controls as necessary
•  Post closure requirements which include:
      1. Maintenance of the cover
      2. The O & M of a groundwater capture and treatment system
      3. Maintenance of a groundwater monitoring system

8.B.2.    The Treatment Wetland - In the FS addendum, the MDEQ and EPA evaluated
the treatment or constructed wetland as  potential groundwater treatment alternative.
Traditional treatment systems generally require steel, concrete, chemicals, and energy to
work. In contrast, the wetland relies on natural processes to treat contaminated
groundwater requiring very little energy to operate. The wetland does, however, require
substantially more land than traditional systems to function properly.  Treatment wetlands
are currently used to treat a variety of wastewater effluents, including municipal and
mining waste water, urban and agricultural stormwater, sludge, leachates, and various
industrial effluents. About 1,000 treatment wetlands exist in North America. Overall, the
treatment wetland appears to be a highly effective option that promises substantial cost
savings  over the more traditional systems screened in the original FS.

The MDEQ and EPA consider the use of a treatment wetland at North Bronson to be
innovative technology.  Generally, treatment wetlands have been built and used to treat
surface water discharges containing individual contaminants. Because of the limited
amount  of data available about a treatment wetland's ability to remove the large variety of
contaminants found in the groundwater at the site, the MDEQ and the EPA had to make
assumptions, generally concerning treatment efficiencies, in developing this specific
alternative.  However, based on these assumptions and the evaluation conducted in the
FS addendum, the treatment wetland appears to be a technically feasible but untested
option to address the lagoon contaminated groundwater at the site.  The combination  of
apparent effectiveness and substantial cost savings for this technology over the other
alternatives screened for the site makes a treatment wetland worth developing.

8.B.3.    Capital Costs - Site-wide alternatives designed to address the entire site were
developed by combining elements of several area-specific (e.g. lagoons, CD #30)
alternatives. The capital cost for each site-wide alternative was estimated by summing
the capital cost of the individual area-specific alternatives developed in the FS.
Constructed wetland costs were developed in the FS addendum. Engineering,
permitting, contingency, and management fees for each site-wide alternative were
'iased on 65 percent of the capital cost of each site-wide alternative.  The O&M cost for
each alternative was estimated  using the annual maintenance cost for the component
specified, plus $35,000 for annual groundwater monitoring.

Only RCRA Type C or MDEQ Type III impermeable landfill caps were identified in the
FS.  However, an impermeable cap is not practical for remedies that leave waste
on-site below the water table. Therefore, an engineered soil cover replaced RCRA
Type C  caps for site-wide alternatives not requiring an impermeable cap.  The capital

                                                                              31

-------
cost of an engineered soil cover was based on landfill covers developed for similar
projects.

The capital and O&M costs used to develop area-wide alternatives are as follows:

                           COSTS ESTIMATES
              COMPONENT
1.     Excavation of the EL
2.     Dredging of CD #30
3.     Engineered Soil Cover (WL)
4.     Protective Barrier (EL)#
5.     French Drain (selected areas)
6.     French Drain (ELs and WLs)
7.     RCRA Type C cap (WL)
8.     RCRA Type C cap (EL)
9.     Slurry wall
10.   Treatment Wetland
11.   Traditional* groundwater treatment
12.   Dredging and treating CD #30
13.   Excavating & treating EL
14.   Excavating & treating WL
15.   Solidifying/stabilizing lagoons
16.   Annual groundwater monitoring
 UNIT COST
$   450,000
$   150,000
$   500,000
$   200,000
$   100,000
$   300,000
$ 1,000,000
$   500,000
$   350,000
$   650,000
$   900,000
$ 1,000,000
$ 6,000,000
$31,000,000
$ 7,000,000
O&M COST
  $
  $
$
$
  $
  $
        0
        0
   2,000
   1,000
        0
        0
   5,000
   5,000
   2,000
$ 35,000
$100,000
 $      0
 $      0
 $      0
 $      0
 $ 35,000
$
$
$
* Traditional treatment of groundwater refers to chemical oxidation, precipitation/
flocculation, and ion exchange processes.
# This component was added in response to comment 3.3 in the Responsiveness
Summary.

8.B.4.    Common Elements - All the alternatives considered for OU 1 except "no action"
have a number of common elements. These elements are:

1.  Institutional Controls/Access Restrictions - This refers to fencing, warning signs.
   permanent markers, and deed restrictions on the property to control future site
   development and the use of impacted resources like groundwater.
2.  Further Characterization - Further characterization of impacted areas will be
   required to specify the extent of soil, sludge, sediment, and groundwater
   contamination in the source areas.  Further characterization will also be needed to
   specify the amount of soil and sludge to be removed from the EL area, and the
   amount of sediment to be removed from CD #30.
3.  Updating Groundwater Data - Additional groundwater studies will be conducted
   during the pre-design phase of the project to update the groundwater data for the site.
   The new data will be used to confirm conclusions reached in the RI/FS and the Risk
   Assessment and to update groundwater data for design.

-------
4. Groundwater Monitoring - Groundwater monitoring will be required to confirm the
   effectiveness of the selected remedy.
5. Five Year Reviews - A review will be conducted at least every five years to evaluate
   the protectiveness of the remedy as long as hazardous substances are present on-
   site and in the groundwater above health-based levels.

8.B.5.    Alternative 1. No Action - The Superfund program requires that a "no action"
option be considered at every site.  Under a no action remedy the site would remain as it
is today.  This option is used as the benchmark for comparing and evaluating the
effectiveness of all other alternatives.

The costs associated with a no action alternative are those related to the five-year
reviews and groundwater monitoring. Thirty-year present worth estimates for reviews and
for groundwater monitoring is $500,000. However, a no action remedy does not meet the
cleanup objectives for the site, and would allow a continued unacceptable risk to human
health and the environment.

8.B.6.    Alternative 2 - Alternative 2 requires excavating soil and sludge from the EL
area and depositing the material into the WLs without treating the waste (EL4
excavation without treatment), constructing an engineered soil cover over the WLs
;'WL2), dredging sediment along selected areas of CD #30, and depositing the waste
into the WL. Installing a French  Drain groundwater collection system between the WLs
and the drain, and using traditional treatment technology to treat the groundwater
intercepted by the French Drain (CD6),  and institutional controls.
Capital Costs: $3.465,000      O & M:  $137,000   Present Worth: $5,165,000

8.B.7.    Alternative 3 - Alternative 3 requires excavating soil and sludge from the EL
area and depositing the material into the WLs without treating the waste (EL4
excavation without treatment), constructing an engineered soil cover over the WLs
(WL2), dredging sediment along selected areas of CD #30, and depositing the waste
into the WL. Installing a French  Drain groundwater collection system between the WL
and CD #30, using an engineered wetland to treat groundwater intercepted by the
French Drain (CD6), and institutional controls.
Capital Costs: $3,052,500      O & M:  $72,000    Present Worth: $3,946,000

8.B.8.    Alternative 4 - Alternative 4 requires excavating and treating soil, sludge,  and
sediment from the WL and EL areas and CD #30 (EL4, WL4 and CD6), installing a
i  rench Drain along selected areas of CD #30, and using traditional treatment
technology to treat the groundwater intercepted by the French Drain, and institutional
controls.
Capital Costs: $64,350,000     O & M: $100,000   Present Worth: $65,591,000

8.B.9.    Alternative 5 - Alternative 5 requires dredging sediment along selected areas
of CD #30 without treating the waste and depositing the material into the WLs.
Installing a French Drain groundwater collection system along selected areas of the

-------
drain, and using traditional treatment technology to treat groundwater intercepted by the
French Drain (CD6), excavating soil and sludge from the EL area and depositing the
material into the WLs without treating the waste (EL4 excavation without treatment),
solidifying or fixing soil, sludge, and sediment in the WLs (WL3), constructing a Type C
landfill cap over the WL area, and institutional controls.
Capital Costs:  $15,097,500     0 & M:  $140,000  Present Worth: $16,835,000

8.B.10.   Alternatives - Alternative 6 requires constructing a slurry wall around the
WLs (WLG3), excavating soil and sludge from the EL area, without treating the waste,
depositing the material into the WL (EL4 excavation without treatment), dredging
sediment along selected areas of CD #30, and depositing the material into the WLs.
Constructing a French Drain groundwater collection system between the WLs and CD
#30, using traditional treatment technology to treat groundwater intercepted by the
French Drain and pumped from within the slurry wall (CD6, WLG3), constructing a
Type III landfill cap over the WLs (WL2), and institutional controls.
Capital Costs:  $4,867,500      O & M:  $145,000 . Present Worth: $6,667,000

8.B.11.   Alternative 7 - Alternative 7 requires constructing a slurry wall around the
WLs (WLG3), excavating soil and sludge from the EL area without treating the waste,
depositing the material into the WLs (EL4 excavation without treatment), dredging
sediment along selected areas of CD #30, and depositing the material into the WLs.
Constructing a French Drain groundwater collection system between the WL and CD
#30, using an engineered wetland to treat groundwater intercepted by the French Drain,
and from within the slurry wall (CD6 WLG3), constructing a Type III landfill cap over the
WLs, and institutional controls.
Capital Costs:  $4,455,000      O & M:  $77,000   Present Worth: $5,410,000

8.B.12.   Alternatives - Alternative 8 requires dredging CD #30 sediment and
depositing the material into the WLs.  Constructing an engineered soil cover over WLs
and a protective barrier over the EL area. Constructing a French Drain/pipe from the
EL to the WL, using  an engineered wetland to treat groundwater intercepted by the
French Drain, and institutional controls. This alternative was added in response to the
comment 3.3 in the Responsiveness Summary.  Costs may vary depending on the size
of the wetland required to treat the additional water captured by the EL French Drain.
Capital Costs:  $3,135,000       O & M:  $73,000   Present Worth: $4,041,000
9. SELECTION OF THE PREFERRED REMEDY

The preferred site-wide alternative presented in the Proposed Plan and here as the final
remedy was selected on the basis of a comparative review of each site-wide alternative
developed using the nine criteria specified in the National Contingency Plan (NCP) at
40 CFR Section 300.430 (e)(9):  The analysis is based on two threshold criteria, five
primary balancing criteria, and two modifying criteria.  The results of this comparison
are presented below.


                                                                              34

-------
9.A.      Threshold Criteria
Remedial alternatives at Superfund sites must satisfy two "threshold" criteria specified
in the NCP to be eligible for further review and selection:

9.A.1.     Overall Protection of Human Health and the Environment - Overall protection
of human health and the environment addresses whether or not a remedy provides
adequate protection and describes how risks posed through each pathway are
eliminated, reduced, or controlled through treatment, engineering controls,  or
institutional controls.

All of the alternatives considered for the site are protective of human health and the
environment by eliminating, reducing, or controlling risks at the site.with the exception of
the no action alternative. The no action alternative does not provide  protection for human
health and the environment. Alternatives 2 through 8 prevent contact with contaminated
groundwater by enforcing groundwater use restrictions in the industrial area. Alternatives
2, 3, 6, 7, and 8 eliminate direct contact with hazardous materials through the use of soil
covers or landfill caps. Alternative 4 prevents exposures and mitigates impacts to the
groundwater by removing, treating (i.e. soil washing), and disposing wastes off-site.
Alternative 5 mitigates the migration and the impact of lagoon contaminants on the
groundwater by immobilizing hazardous constituents within the lagoons. Alternatives 6
and 7 mitigate migration and impact to the WL groundwater by enclosing the hazardous
waste by surrounding the lagoons with a slurry wall. All of the area-wide alternatives
prevent the migration of contaminants in the groundwater into surface water by
intercepting and treating contaminated groundwater before it vents to CD #30.

9.A.2.    Compliance with Applicable or Relevant and Appropriate Requirements
(ARARs) - Compliance with ARARs describes how the alternative complies with
chemical-, location-, and action-specific ARARs, or other criteria, advisories, and
guidance.

Each alternative complies with identified federal and state ARARs, except Alternative 1.
Because Alternative 1  (no action) does not meet the threshold criteria,  it will not be
considered further.

9.B.	Primary Balancing Criteria
The following five criteria are used to compare and evaluate the elements of one
alternative to another that meet the threshold criteria.

9.B.1.    Long-term Effectiveness and Permanence - Long-term effectiveness and
permanence evaluates the effectiveness of alternatives in  protecting  human health and
the environment after response objectives have been met, in terms of the magnitude of
residual risk and the adequacy and reliability of controls.

Alternatives 2, 3, 6, and 7 would minimize long-term exposures by consolidating
contaminated EL soil and sludge and CD #30 sediment into the WLs, covering the
                                                                               35

-------
material in the WL with an engineered soil cover or Type III landfill cap, maintaining the
building in the EL area which is currently covering any hazardous material that may exist
beneath the building, fencing off the WL disposal area, and establishing deed restrictions
to prevent future development in the WL area. Excavating accessible contaminated soil
and sludge from the EL area should reduce the migration of contaminants through the
groundwater in that area to concentrations below regulatory concern.  Contaminated
groundwater migrating from the WL would be captured and contained or treated.

Alternative 8 would minimize long  term exposure by covering both EL and WL areas,
removing contaminated sediment  from CD #30 and capturing and treating contaminated
groundwater in both EL and WL areas.

Institutional controls such as a city ordinance or restrictive covenants would be
established and enforced to prevent the use of contaminated groundwater in the upper
aquifer for all of the alternatives.

Alternatives 4 and 5 would require the excavation, treatment, and off-site disposal of
contaminated soil and sludge from the lagoons and CD #30 sediment. These alternatives
would eliminate exposures and the migration of hazardous constituents in the area.
Institutional controls such as a city ordinance would be established and enforced to
prevent the use of contaminated groundwater in the upper aquifer.

9.B.2.     Reduction of Toxicity, Mobility, or Volume (TMV) through Treatment -
Reduction in TMV through treatment evaluates the treatment technologies by the
degree of expected  reduction in toxicity, mobility, or volume of hazardous material. This
criterion also evaluates the  irreversibility of the treatment process and the type and
quantity of residuals remaining after treatment.

Alternatives 2, 3, 6, 7, and 8 do not reduce the TMV of contaminants in soils, sludge, or
sediment through treatment.  In alternatives 4 and 5 approximately 150,000 cubic yards
of soil would be excavated and treated by soil washing, solidification, or stabilization.
Alternatives 4 and 5 would provide a greater reduction in TMV through treatment of site-
related contaminants than alternatives 2, 3,6, 7, and 8.

The reduction of TMV through treatment of contaminants in lagoon area groundwater will
not occur in Alternatives 2,4, 5, 6, and potentially 8 if the residual carbon is land
disposed,  because the contaminants will only be transferred to the carbon and not
treated. If the residual carbon is regenerated, TMV will be reduced by treatment.
Alternative 3, 7, and potentially 8 do not reduce the TMV of contaminants in groundwater
through treatment.

9.B.3     Short-Term Effectiveness - Short-term effectiveness addresses the period of
time needed to achieve protection and any adverse impacts on human health and the
environment that may be posed during the construction  and implementation period,
until the remedial action objectives are achieved.
                                                                               36

-------
Alternatives 2, 3, 4, 6, 7, and 8 would create short-term impacts comparable to one
another, including the release of dust and air pollutants during the excavation of
contaminated soils, increased noise levels, and increased traffic around the site.  Use of
engineering controls would limit air emissions.  Alternative 5 may have less of an impact if
the stabilization  or solidification process could take place without excavating the soil.

9.B.4.    Implementability - Implementability assesses the ability to construct and
operate the technology; the reliability of the technology; the ease of undertaking
additional remedial actions; and the ability to monitor the effectiveness of the remedy.
Administrative feasibility is addressed in terms of the ability to obtain  approvals from
other agencies. This criterion also evaluates the availability of required resources, such
as equipment, facilities, specialists, and capacity.

Technical and administrative requirements for implementing Alternatives 2, 3, and 8
would be low. Technical and administrative requirements for implementing Alternatives 4
and 5 would be  high. Technical and administrative requirements for implementing
Alternatives 6 and 7 would be moderately high. Alternative 4 would have to comply with
administrative requirements regarding transport of hazardous waste.

9.B.57.   Cost - Cost evaluates the estimated capital, Operation & Maintenance (O&M),
and total present worth cost of each alternative. The total present worth is the money
that needs to  be set aside now, at the prevailing interest rate, to pay for all capital and
future costs. The present worth estimate assumes a 30-year project life.

Costs range from a low of approximately 4 million dollars for Alternative 3 to a high of over
60 million dollars for Alternative 4.

9.C.      Modifying Criteria
The modifying criteria are used in the final evaluation of remedial alternatives after
public comment on the RI/FS and Proposed Plan has been received.

9.C. 1.    EPA Acceptance - EPA acceptance addresses whether, based on its review
of the RI/FS and Proposed Plan,  the EPA concurs with, opposes, or  has no comment
on the proposed remedial alternative.

The EPA has provided comments on the RI/FS and the Proposed Plan and concurs
with the selection  of Alternative 3 for this Interim Action at the site. The EPA letter of
concurrence is presented in Appendix A.

9.C.2.    Community Acceptance - Community acceptance addresses whether the
public concurs with the Proposed Plan. Community acceptance of the Proposed Plan
was evaluated based on comments received at the Public Meeting and during  the
public comment period. Community response indicates that Alternative 3 is supported.
This is documented in the Responsiveness Summary presented in Appendix A.
37

-------
10. THE SELECTED REMEDY

After considering the requirements of CERCLA and the NCR, and based upon the
evaluation of the RI/FS and the nine criteria, the MDEQ in consultation with the EPA,
selected Alternative 3 for OU 1 at the site.

Alternative 3 - Alternative 3 requires the following actions for OU 1:
•  Excavate EL contaminated soil and sludge.
•  Dredge contaminated sediment from CD #30.
•  Consolidate contaminated waste from the ELs and CD #30 into the WLs.
•  Cover the WL area with an engineered soil cover.
•  Install a French Drain between the WLs and CD #30 to capture contaminated
   groundwater.
•  Construct a treatment wetland to treat contaminated water collected by the French
   Drain.
•  Pump contaminated water from the French Drain to the treatment wetland.
•  Discharge treated water to CD #30.
•  Monitor, ground water and surface water quality to assess the effectiveness of the
   remedy.
•  Install permanent warning markers or post signs.
•  Fence off the WL and wetland area.
•  Incorporate restrictions on land use through deed restrictions or local ordinances.
•  Restrict the use of contaminated groundwater through passage and implementation of
   local ordinances.

10.A.    The ELs
Contaminated soils and sludge in the EL area will be excavated (without treatment) and
consolidated into the WLs.  Contaminated sludge or soil, if present beneath the BPC
building, is to remain in-place, capped by the building.  Deed restrictions must ensure the
building remains in place, in good condition. Additional investigations or response actions
may be required to eliminate the  need for the building to remain as a protective cover.
The removal and capping of the most contaminated zone of soil in this area eliminates
direct contact concerns and  reduces the impact of the waste material  on the groundwater.
The highest concentrations of contaminants in the EL area are generally found in the
upper ten feet of soil.

The estimated amount of contaminated sludge and soil to be excavated is 26,000 cubic
yards.  The exact volume which must be excavated to meet ARARs will be determined
during predesign studies.  Under this plan, the excavated material would not be treated.
All excavated material would instead be consolidated and buried in the WLs. The
excavated area will be backfilled with clean soil. Future excavations below ten feet in the
removal area or beneath the building will be prohibited unless proper  precautions are
taken to maintain the integrity of the building, protect workers from potential exposure to
contamination, and ensure contaminated soil is properly managed.
                                                                              38

-------
10.B.     ELG
The removal of the accessible contaminated soil and sludge in the EL area, and the
capping by the building of any residual material that may be beneath the building, should
reduce the concentration of contaminants leaching into the groundwater.  This should
lower the concentration of contaminants detected in the EL groundwater to acceptable
levels at the GSI for CD #30.  After this action, groundwater monitoring will be required in
the area to evaluate the effectiveness of the remedy.

10.C.     CD #30
Sediment in CD #30 contaminated above the cleanup goals will be dredged from the
drain. Dredged material would then be consolidated with wastes in the WLs.  A French
Drain will be installed along the WL area to intercept contaminated groundwater from the
WLs.  This action would prevent the recontamination of sediment in the drain and the
release of contaminants from the WL area into the environment. A French Drain along
the ELs should not be necessary. Removal of the source material in this area is expected
to lower the concentration of contaminants in the groundwater to a level that is protective
of human health and the environment.

10.D.     The WL Area
The WL area will be covered with an engineered soil cover to prevent direct contact
exposures to the hazardous waste.

After this action, contaminated waste will  remain on-site to a depth of at least 20 feet
below the ground.  The amount of waste that will remain on-site is estimated at 150,000
cubic yards. The WL area will require deed restrictions,  fencing, and must be identified
with a permanent site marker to prevent future activities  in the area other than
maintenance requirements for the remedy.

10.E.     Groundwater Treatment
Groundwater impacted by the waste material in the WL repository will be intercepted by a
French Drain to prevent it from entering CD #30.  Contaminated water will be pumped
from the drain and discharged to a treatment wetland. Contaminated groundwater will
flow through the wetland for treatment before being discharged to CD #30. The wetland
will be fenced off and managed as part of the WL repository.  The feasibility of using a
treatment wetland  as a technology for treating the groundwater at this site was evaluated
in the FS addendum.

    °atment wetland is a technology that requires land and vegetation instead of
mechanical devices to clean the water. In the FS addendum for the site, the size of the
treatment wetland  necessary  to meet groundwater treatment goals was estimated at 11.3
acres.  This estimate was based on capturing and treating groundwater from both the EL
and WL areas. However, it should not be necessary to treat groundwater in the EL area if
EL waste is excavated. As the volume of water requiring treatment is reduced, the size of
the treatment wetland can be reduced. Current estimates indicate the size of the wetland
may be reduced by 50 percent or around six acres.

                                                                              39

-------
10.F.     Cost
The total present worth cost for Alternative 3 is estimated at approximately 4 million
dollars.

Changes may be made to the preferred remedy during remedial design and construction.
Such changes, in general, reflect modifications resulting from the engineering design
process.
11. STATUTORY DETERMINATIONS

To satisfy the requirements of Section 121(a-e) of CERCLA the selected remedy must:
•  Protect human health and the environment.
•  Comply with ARARs (or justify an ARAR waiver).
•  Be cost-effective.
•  Use permanent solutions and alternative treatment .technologies to the maximum
   extent practicable.
•  Satisfy the preference for treatment that reduces TMV as a principal element of the
   remedy, or provide an explanation as to why this preference is not satisfied.

The implementation of Alternative 3 at the site satisfies these statutory requirements as
detailed below:

11.A.    Protection of Human Health and the Environment
Implementation of Alternative 3 will reduce and control risks to human health and the
environment posed by direct contact with, ingestion of, or inhalation of contaminated soil,
sludge, sediment, or groundwater.  The carcinogenic risk will be reduced to 10"5 and the
HI for noncarcinogens will be less than one.

Contaminated groundwater will be managed or intercepted before migrating beyond the
boundaries of the waste management area (the site boundaries) and treated as needed
to meet federal and state groundwater cleanup criteria.  Institutional controls will be
established and enforced to prohibit the use of contaminated groundwater within the
managed area.

Accessible soil and sludge in the EL area will be excavated and consolidated into the WL
area to reduce the cancer risk to 1 X 10E-5 and the  HI for noncarcinogens to less than
one. The cleanup will also mitigate the migration of contaminants to groundwater.
MDEQ Industrial Cleanup Criteria will be used to establish cleanup standards for the EL
area.

Sediment in CD #30 will be dredged and disposed of in the WLs to reduce the cancer risk
to 1 X 10E-5 and the HI for noncarcinogens to less than one.  MDEQ Residential Cleanup
Criteria will be used to establish cleanup standards for CD #30.
                                                                              40

-------
The WL repository will be covered, fenced, and maintained to prevent direct contact with
hazardous waste.

Alternative 3 could pose risks to the community and on-site workers from dusts and air
emissions generated during excavation activities. Perimeter air monitoring will be needed
during remedial activities to determine if steps are needed to protect the community from
adverse air emissions. Workers conducting the remedial action will be required to
monitor their activities and to wear the proper protective health and safety equipment.
Truck routes will be established to maximize public safety and to minimize the
inconvenience to local residents and businesses. Implementing the selected remedy will
not result in unacceptable short-term risks to human health or unacceptable impacts  on
the environment.

11 .B.    Compliance With ARARs
Alternative 3 will comply with identified federal and state ARARs. Potential  chemical,
action and location-specific ARARs and other requirements to be considered (TBC) were
identified, and summarized in Section 2.0 of the FS report and Section 5.0 of the FS
addendum. The ARARs and  TBCs for this interim action are listed below.

11.B.1.   Chemical-Specific ARARs - Chemical-specific ARARs regulate the release to
the environment of specific substances having certain chemical characteristics.
Chemical-specific ARARs typically determine the extent of cleanup at a site.

11.B.1.a     Soil/Sediments
State Regulatory Requirements
i.     Part 201 of the Michigan Natural Resources and Environmental Protection Act 451
of 1994 as amended. Part 201 provides criteria for developing risk-based cleanup
standards that consider site specific conditions and use.  Site specific risk-based cleanup
criteria were developed for soil and sediment pursuant to Part 201.

11.B.1.b.    Groundwater/Surface Water
State Regulatory Requirements
i.     Part 201 of the Michigan Natural Resources and Environmental Protection Act 451
of 1994 as amended. Part 201 provides criteria for establishing risk-based cleanup
standards that consider site-specific conditions and use. Site specific cleanup criteria for
groundwater and surface water were developed pursuant to Part 201.

ii.     Part 31  of Public Act 451 (Part 4, Water Quality Standards). Part 31 regulates the
      direct and indirect discharge of any injurious substances to the waters  of the state.
      All final effluent contaminant concentrations for any groundwater treatment system
      must comply with the requirements established under Part 31.

iii.    Michigan Safe Drinking Water Act (Act 399 of 1976, as amended).  Michigan's
      Safe Drinking Water Act adopts the Federal MCLs as acceptable concentrations
      for public drinking water supplies (see below).
                                                                              41

-------
Federal Regulatory Requirements
i.     Safe Drinking Water Act (SDWA) Maximum Contaminant Levels (MCLs) and
SDWA MCL Goals. MCLs and nonzero Maximum Contaminant Level Goals (MCLGs)
promulgated under the SDWA, 1976 PA 399, as amended, apply to municipal water
supplies servicing 25 or more people. At the North Branson site, MCLs and MCLGs are
not applicable, but are relevant and appropriate, because the sand and gravel aquifer is a
groundwater source that was and could be used for drinking water within the area of
concern (where the contaminant plume is located). MCLGs are relevant and appropriate
when the MCLG standard is set at a level greater than zero (for noncarcinogens).
Otherwise, MCLs are relevant and appropriate. If the groundwater standards are
exceeded at the point(s) of compliance, groundwater remediation or exposure controls, or
both, may be required to address potential off-site risks. Institutional controls will be
required to prevent the use of contaminated groundwater within the site boundaries.

ii.     The Clean Water Act (CWA) Ambient Water Quality Criteria (AWOC) (33 USC
1251).  The CWA AWQC are health and ecological-based criteria developed for
carcinogenic and noncarcinogenic compounds and water quality parameters. These
standards were used to evaluate the extent of chemical contamination in surface water
associated with CD#30.

11 .B.2To Be Considered (TBC) Requirements
TBCs are nonpromulgated advisories or guidance issued by the federal or state
government that are not legally binding and do not have the status of potential ARARs.
However, if there are no specific ARARs for a chemical or site condition or if existing
ARARs are not deemed sufficiently protective then guidance or advisory criteria should be
identified and used to protect human health and the environment.

Groundwater TBCs
i.     MDEQ Operational  Memorandum #17 (OPMEMO #17). OPMEMO #17 provides
guidelines and describes the information regarding criteria to be met at the Groundwater/
Surface water interface for contaminated groundwater discharging to surface water.
Sediment TBCs
i.     National Oceanic and Atmospheric Administration (NOAA) and Ontario sediment
screening guidelines.  NOAA and Ontario provide screening guidelines and
concentrations for comparison to compounds detected in sediments. Because no
promulgated standards for contaminants in sediment exist, these guidelines and
concentrations were used to evaluate the extent of contamination in CD#30 sediments
and to develop cleanup criteria for the impacted sediment.

ii.     Also, background concentrations were used to evaluate the impact of the runoff of
contaminants in surface soil to surface water and sediment. Background levels were
used because no promulgated standards exist to evaluate this pathway.
42

-------
11.B.3.   Location-specific ARARs - Location-specific ARARs are those requirements
that relate to the geographical position of a site.  There are no location-specific ARARs for
this site.

11 .B.4.   Action-specific ARARs - Action-specific ARARs are requirements that define
acceptable handling, treatment, and disposal procedures for hazardous substances.

State Regulatory Requirements
i.     Part 111, Hazardous Waste Management, of the NREPA.  Part 111 applies when
managing the treatment residuals from the groundwater treatment system (e.g., wetland
substrate), or in designing the cover for the lagoons.

ii.     Part 55, Air Pollution Control, of the NREPA. Part 55 contains specific regulations
that pertain to allowable emissions of pollutants from various air containment source
categories and processes (e.g., wetland, air stripper).

iii.     Part 91, Soil Erosion and Sedimentation Control, of the NREPA apply to the site.
Part 91 sets requirements for soil erosion and sedimentation control during construction
activities.

iv     Part 31, Water Resources Protection, of the NREPA, (Part 21 & 22).  Direct
discharges to surface water or groundwater must meet the requirements of Part 31.

Federal Regulatory Requirements
i.     CWA NPDES 40 CFR Parts 122, 125. Discharges to surface waters from
CERCLA sites are required to meet the substantive CWA NPDES requirements.

ii.     CWA - Pretreatment Standards for Publicly Owned Treatment Works (POTW)
Discharge, 40 CFR Part 403.  If treated groundwater from the site is discharged to the
local POTW, the treated water must meet all discharge limitations imposed by the POTW.

iii.     Clean Air Act - National Primary and Secondary Ambient Air Quality Standards.
The National Ambient Air Quality Standard would apply to any invasive or construction
activities with the potential of generating significant dust.

iv.    United States Department of Transportation Rules for Transportation of Hazardous
Materials (49 CFR Parts 107,  171.1 -172.558) apply when transporting hazardous waste
 •ff site. Also, federal and state RCRA land disposal restrictions governing off-site
disposal apply to the disposal of treatment residuals. If residuals from groundwater
treatment or soil, sludge, or sediment removed from the site are RCRA hazardous
wastes, the materials will be managed and transported to a licensed off-site disposal
facility in compliance with these regulations.
                                                                             43

-------
v.     Solid Waste Disposal Act (SWDA) as amended by the RCRA.
       1. Criteria for Classification of Solid Waste Disposal Facilities and Practices (40
       CFR Part 257). Applicable if the alternative would involve the land disposal of
       solid waste.
       2. Identification and Listing of Hazardous Wastes (40 CFR Part 261).  Identifies
       substances considered to be hazardous.
       3. Standards Applicable to Generators of Hazardous Waste (40 CFR Part 262).
       4. Standards Applicable to Transporters of Hazardous Waste (40 CFR Part 263).
       5. Standards for Treatment, Storage, and Disposal Facilities (40 CFR Part 264).

vi.     Occupational Safety and Health Act (OSHA).  Under 40  CFR Sect. 300.38,
requirements of OSHA apply to all response activities under the NCP.

11.C.    Cost Effectiveness
Cost effectiveness compares the overall effectiveness of an alternative to meet remedial
action objectives in proportion to its cost.  Alternative 3 .was the least costly of the eight
alternatives developed which met the remedial objectives.  Therefore, it appears to be a
highly cost-effective remedy.

11 .D.    Using Permanent Solutions and Alternate Treatment Technologies to the
Maximum Extent Practicable
The selected remedy for OU 1 uses permanent solutions and treatment technologies to
the maximum extent practicable. Determining the 'maximum extent practicable' involved
assessing tradeoffs among the alternatives in terms of the five primary balancing criteria
of the nine criteria.  The selected remedy provides long-term effectiveness and
permanence by using institutional  controls to limit exposure and treating contaminated
groundwater. This is a lesser degree of long-term effectiveness and permanence  than
could have  been  attained through  removal or treatment of contaminated soils, because
continued monitoring and maintenance will be required.  However, removing and treating
contaminated soil, sludge, and sediment at an estimated $60 million was prohibitively
expensive.  Consolidating the waste into one manageable unit and using a wetland as an
alternate technology to treat groundwater provides a high level  of short-term
effectiveness. The selected remedy reduces the TMV of contaminated groundwater,
while reducing the risk of exposure to other contaminated media. This remedy is also
easily implemented, compared to the other alternatives considered. The combination of
effective risk reduction, groundwater treatment, and relatively low cost make the selected
alternative clearly preferable.

11 .E.    Preference for Treatment as a Principal Element
Excavating  and consolidating soil, sludge, and sediment does not satisfy the statutory
preference  for treatment. The cost for treating this material made treatment impractical.
                                                                              44

-------
12.   DOCUMENTATION OF SIGNIFICANT CHANGES

Five of the six area-wide alternatives (2, 4, 5, 6, and 7) presented in the ROD evolved
during the development of the proposed plan. Although their components were in the
proposed plan these consolidated area-wide alternatives were not presented in the
proposed plan or at the public meeting.  These alternatives are presented here in the
ROD to help clarify and document the comparative analysis that was conducted
between all of the potential alternatives developed for the site and the final proposed
plan and remedy.  The MDEQ developed Alternative 8 after receiving comment 3.3
from the City. The cost of this alternative is somewhat more speculative than the other
alternatives. Capturing groundwater from the EL area would likely increase the volume
of water needed to be treated.  This would require constructing a larger wetland or
resorting to a more traditional treatment method which could increase the cost over the
estimate provided. The selection of Alternative 3 as the preferred remedy has not been
affected by the above.  Finally, the use of Branson's Waste Water Treatment Plant will
remain as a potential option to treat contaminated groundwater. Use of the treatment
plant will be based on the capability of the treatment plant to treat contaminated
groundwater, and ultimately the city's decision of whether or not to use the plant in this
manner.
                                                                            45

-------
                            7.B.4. #6 APPENDIX A

                       RESPONSIVENESS SUMMARY
 1.    OVERVIEW
 The Responsiveness Summary is a compilation of oral and written comments received
 by the MDEQ during the Proposed Plan public comment period and the MDEQ's
 responses to those comments.

 The MDEQ released the Proposed Plan for the site to the public on August 6, 1997.
 The public comment period for the Proposed Plan ran from August 6, through
 September 8, 1997. The comment period is an opportunity for interested parties to
 comment on the Proposed Plan or any other document used to develop the remedy for
 the site.

 The MDEQ and the EPA held a public meeting at 6:00 p.m. on August  19, 1997, at the
 Bronsoh Theater in Bronson, Michigan. The purpose of this meeting was to formally
 present the Proposed Plan for treating contamination at the site, and to provide the
 community an opportunity to address the agencies directly concerning the plan.
 Transcripts of this meeting are available for review in the Administrative Record.

 The responsiveness summary is a  key part of the ROD, identifying community concerns
 for the MDEQ and the EPA.

 2.    BACKGROUND ON COMMUNITY INVOLVEMENT AND CONCERNS

 See Section 2C of the ROD.

 3.    SUMMARY OF MAJOR QUESTIONS AND COMMENTS RECEIVED DURING
 THE PUBLIC COMMENT PERIOD AND THE MDEQ RESPONSES TO THOSE
 COMMENTS.

 3.1    Comment: The city of Bronson comments that the Proposed Plan (the plan)
 presents a preferred remedy for the site, but purports to exclude from the cleanup any
 contamination associated with the industrial sewers. According to the Plan, any
 contamination from the industrial sewers will be addressed in the future, presumably in
 another OU.  No explanation is given for dividing the site into separate  OUs,  and there
 is no rational basis for doing so.

The contamination has existed at this site for decades. Drinking water for the area is
supplied by the city of Bronson. There certainly is no imminent hazard in connection
with the contamination at the site.  Nevertheless, the Plan inexplicably recommends a
partial remedy of the site, indicating that the industrial  sewer will be addressed at a later
date.

-------
 If any additional remedy is required in connection with the industrial sewer, it should be
 handled as part of the proposed remedy. The industrial sewer should not be treated as
 a separate OU. This will only lead to inefficiency and increased costs. It is difficult to
 imagine why it is so important to move forward with a partial remedy at the site at this
 time, when the site has  been under investigation for nearly 15 years.  A single remedy
 should be performed for the entire site, and there should not be separate OUs.  The
 remedy proposed in the Plan, which appears to be a separate OU, should be deferred
 until a final remedial action can be selected for the site.

 MDEQ Response: The Proposed Plan as presented controls the migration of
 groundwater impacted by the lagoons, prevents direct contact with the soil and sludge
 in and around the lagoons, and as an interim measure prevents exposure to the
 groundwater plume by prohibiting the use of contaminated groundwater.  However,
 restoration of a contaminated aquifer, when technically feasible, is one of the primary
 objectives of Superfund.

 TCE is one of the predominant contaminants detected in the groundwater.  The data
 that is available indicates that TCE, which is heavier than water, leaked from the
industrial sewer and pooled or has contaminated soils above and below the water table
 beneath the former Scott Fetzer and LA Darling facilities. However, because of limited
data there is a moderate to high level of uncertainty that exists regarding the locations
of the TCE sources. Also, there is a moderate to high level of uncertainty regarding
the potential for restoring an aquifer contaminated with TCE.  Therefore, a phased or
 OU approach was adopted in the Proposed Plan. This approach allows us to address
the lagoons while developing a better understanding of the restoration potential of the
Bronson aquifer contaminated with TCE.

Further, all of the components of the Proposed Plan will be necessary regardless of the
outcome of the TCE investigation or the "final" remedy selected for the site.  The French
Drain will be necessary  to intercept contaminated groundwater from the lagoon, and the
wetland will primarily be designed to treat groundwater contaminated with metals from
the lagoons.

 Whether or not further groundwater Remediation is needed to complete MDEQ
response actions at the  site, the Proposed Plan represents the most economical
alternative developed for current or future contamination  problems at the site.

3.2   Comment: The city of Bronson comments that the Plan proposes construction
of a cap over the WL area.  For many reasons, such a cap is unnecessary. Among
other things, the Plan states:

Because the waste is below the water table, preventing the infiltration of rainwater
through the waste is not an objective of the remedy. Under these conditions there  is no
legal or practical advantage to building a cap to strict hazardous waste requirements.

-------
 Nevertheless, the Plan proposes a very expensive cap over the WL area, even though
 there will be no environmental benefit. Apparently, the purpose of such a cap is to
 protect trespassers who may desire to come into regular contact with the contaminated
 sludge and soil.  Contact by trespassers or others in that area, while extremely unlikely
 to occur under any circumstances, can be adequately controlled through other
 institutional measures, such as the fencing proposed in the Plan.

 It is well known that the soil and sludge have existed in the WL area for decades, since
 at least the 1940s. The proposed fencing will be more than sufficient to address any
 concerns over trespassers or others who may be in the area. The amount allocated for
 the construction of the cap is $1 million.  After adding the amount for the various
 contingencies, including construction management, engineering, permitting, and
 "contingencies," the total amount allocated for capital costs relating to the cap is
 $1,630,000. There would also be O & M costs relating to the cap. Construction of the
 cap is unnecessary and the cost far outweighs any benefit.  In fact, the Plan does not
 articulate any realistic benefit that can be achieved by construction of the cap,
 particularly in view of the fencing and related institutional controls that will adequately
 prevent exposure. For these reasons, the cap should be eliminated from the remedy.

 MDEQ Response: The MDEQ does not agree that "fencing alone will be more than
 sufficient to address concerns over trespassers etc."  Fences can be climbed or
 burrowed under, water levels in an open  lagoon rise and fall with the rain,  and seasonal
 groundwater elevation changes may expose or deposit contaminants on the banks of
 the lagoon. Further, an open water lagoon attracts and exposes wildlife to
 contaminants in the lagoons.

 All the alternatives developed for the site, except excavation and treatment, required
 the "capping" of a lagoon. Cap designs and estimated cost for these alternatives were
 based on using a Type III Landfill Cap in compliance with Part 115, Solid Waste
 Management, of the NREPA (pers. comm. MDEQ 1996b). As noted in the Proposed
 Plan,  the remedy will not require a  Type III Cap. Cost estimates for a Type III Cap were
 carried through the detailed evaluation of the alternatives for relative cost comparisons
 only.  The MDEQ agrees and stated during the public meeting that the overall costs
 reported in the Plan are conservative and that the actual cost of implementing the
 Proposed Plan is likely to be lower than estimated. To avoid confusion over this issue
 the word "cap" will be replaced with "an engineered soil cover" in the ROD.

 3.3. Comment:    The city of Bronson comments that under the Plan, the sludge and
 soil from the Els and the sediments from CD #30 would be excavated and deposited
 into the WLs.  The city of Bronson is the owner of the property where the WLs are
 located. The governments have not requested approval  from the city of Bronson for
depositing the soil, sludge, and sediments on city property.

-------
 In view of the remedy proposed for the groundwater, excavation, and transportation of
 such materials creates an increased burden on property owned by the city of Bronson.
 In addition, the Plan does not state what happens with the displaced water as the
 sludge, soil, and sediment is deposited into the WLs.  In any event, if the soil, sludge,
 and sediments from these two locations are excavated and deposited on the city of
 Bronson property, the city of Bronson should be provided appropriate consideration for
 the burden created on the city of Bronson property.

 MDEQ Response:  Excavating and consolidating the EL sludge and soil into the WLs
 simplifies the management of the waste on-site. Consolidating the material into one
 management unit eliminates the need for two French Drain systems (east and west)
 and the need to pump or pipe contaminated groundwater from two separate source
 locations.  This should minimize the amount of groundwater requiring treatment,
 thereby reducing the size of the treatment system. Also, removing the waste from an
 area of industrial activity to an area that is relatively inactive reduces the risk of
 accidental exposure and potentially enhances the commercial value of the EL area.
 However, the MDEQ is willing to consider the possibility of leaving the EL waste in
 place, covering it with a protective barrier, capturing EL contaminated groundwater, and
 piping it to the treatment wetland, if this is shown to be a cost-effective and protective
 alternative during remedial design. Refer to site-wide Alternative 8 in the ROD.

 3.4.  Comment:    The city of Bronson comments that the "Plan states that the ELs
 and WLs were built in 1938 and  1949, respectively (p. 2). In fact, the WLs were built in
 1939 and 1940,  and the ELs were built in 1949."

 MDEQ Response:  The MDEQ  acknowledges the typographical error made in the
 Proposed Plan.

 3.5.  Comment:    The city of Bronson  comments that the Plan states that the city of
 Bronson owned  both sets of lagoons between 1938 and  1960 (p. 2). The ELs were
 sold by the city of Bronson to Bronson Plating in 1969, rather than 1960.

 MDEQ Response:  The Rl reports the ELs  were purchased by Bronson Plating in
 1960. Please provide the MDEQ with documentation showing the purchase of the
 lagoons in 1969.

 3.6.  Comment:    The city of Bronson comments that the Plan states that the ELs
 rig  illy contained five lagoons (p. 2). The city of Bronson believes that there were no
 more than four lagoons in the ELs.

 MDEQ Response:  1966 aerial photos indicate that there were five ELs.

3.7.  Comment:    The city of Bronson comments that in defining the area of
groundwater contamination, the Plan states that the area bounded by Mill Street to the
west is contaminated with chlorinated organic compounds (p. 4). Mill Street is an

-------
 east-west road, and hence cannot be a western boundary. The city of Bronson
 presumes that the governments intended to identify Albers Road as a west boundary.

 MDEQ Response:  The Plan should have referred to the residence at 422 Mill Street
 as the current western boundary of residential wells impacted by site related
 contaminants.

 3.8. Comment:   The city of Bronson comments that the FS addendum states that
 the Part 201 cleanup criteria are potential ARARs for the site. Page 11 of the FS
 addendum states that the ARARs under Part 201, Environmental Remediation, of the
 NREPA, for lagoon soil and sludge include the following:

 MDEQ Part 201 20 x drinking water values or Residential Soil/Water Partition (SWP)
 values, whichever is higher.

 MDEQ Part 201 20 x groundwater/surface water interface (GSI) values or GSI SWP
 values, whichever is higher.

 These descriptions are accurate applications of the Part 201 cleanup criteria for soil
 and sludge for use as an initial screening measure. The cleanup criteria applicable to
 soil and sludge under Part 201 also allow for the use of leaching tests to evaluate the
 potential of contamination in soil and sludge  to impact groundwater. See Part 201
Administrative Rule 299.5611(2) and the Michigan Environmental Response Act
 (MERA), 1982 PA 307, as amended, Operational Memorandum #12, Revision #1
 (September 9, 1994). Accordingly, even if the concentrations in the soil or sludge
exceed the 20 x drinking water SWP values, a leaching test can be performed to
evaluate the potential of the contaminants to leach into the groundwater or surface
water.

The concentration of contaminants in the soil must not, of course, exceed the
applicable direct contact criteria. For many of the contaminants at the site, however,
the direct contact criteria are significantly higher than the 20 x drinking water and
residential SWP values.  Accordingly, in instances where the total concentration
exceeds the 20 x drinking water and SWP values, but are below the applicable direct
contact criteria, leaching tests should be performed to determine whether the soil or
sludge is clean enough to meet the applicable criteria.  The same rationale  is true for
total concentrations that exceed 20 x GSI or GSI SWP values. MERA Operational
Memorandum #12, noted above, describes the various leaching test procedures that
are acceptable for this purpose. In short, the criteria identified in the FS addendum are
appropriate as screening measures but are not definitive in evaluating whether the
cleanup criteria for soil and sludge have been met.  The FS addendum should be
modified to reflect that leaching tests can be performed as a follow-up to the screening
mechanisms identified in the FS addendum.

-------
 MDEQ Response: The MDEQ does not agree with the statement that Part 201
 cleanup criteria used in the FS addendum as cleanup goals are to be used as "an initial
 screening measure." Part 201 cleanup criteria are risk-based values driven by a
 defined level of risk. For carcinogens the risk is 10E-5 and for noncarcinogens a
 hazard quotient of 1. CERCLA (Superfund) identifies and manages risk at sites of
 contamination over a spectrum (10E-4 - 10E-6) of contaminant concentrations or risk.
 Screening levels under CERCLA are developed to identify the lower bound of this
 spectrum. Under CERCLA the lowest level of risk is  10E-6 for carcinogens and for
 noncarcinogens a hazard quotient of 1.  Further, Part 201 cleanup criteria do not
 incorporate inhalation risks nor account for accumulative risks when there is more than
 one contaminant of concern.  Therefore, criteria based on risk as defined by Part 201
 may not be conservative enough to be used as initial screening values under CERCLA.

 Part 201 cleanup criteria, which offers a full range of generic criteria based on land use
 to site specific and remedy specific criteria, were identified as goals in this ROD only
 after a site-specific evaluation indicated that a remedy achieving Part 201 criteria is
 protective, complies with ARARs, and appropriately balances tradeoffs between
 cleanup options with respect to effectiveness and cost.   The MDEQ does agree that
 leaching tests may be performed to demonstrate compliance with soil criteria protective
 of groundwater (Refer to the section 7.8.4. #6 "Common Elements, Performance Goals"
 in the ROD). However, regardless of the method used to demonstrate compliance, the
 cleanup goal will continue to be based on Part 201 cleanup criteria.

 3.9 Comment:     Geraghty & Miller and the North Bronson Potentially Responsible
 Party (PRP) Group comments that the Proposed  Plan includes a combination of
 several alternatives and elements of alternatives which are not adequately described
 either in the Proposed Plan, the FS (Montgomery  Watson 1995), or the  FS Addendum
 (MDEQ 1996a).  The scope, conceptual design details, and estimated costs for certain
 aspects of the proposed remedial action for the site are not clearly presented in the
 Proposed Plan, and thus cannot be properly evaluated by the public as required under
 Section 116(a) of CERCLA.

 MDEQ Response: The MDEQ does not agree with the  statement that  "the scope,
 conceptual design details, and estimated costs for certain aspects of the proposed
 remedial action for the North Bronson Site are not clearly presented in the Proposed
 Plan,  and thus cannot be properly evaluated by the public as required under Section
 116(a) of CERCLA." Section 116(a) of CERCLA requires the notice and brief analysis
 jfthe proposed plan to include "sufficient information as may be necessary to provide a
 reasonable explanation of the proposed plan and alternative proposals  considered."
 The scope, design details, and estimated cost presented in the FS, the FS addendum
 and the Proposed Plan provide a clear basis for understanding the overall intent of the
 cleanup plan and the relative effectiveness and costs associated with each alternative.
 The information  also allowed the public to make reasonable comparisons between the
proposed plan and other alternatives developed for the site. Scope, cost, and design

-------
refinements as recommended by the PRP Group would not affect the overall relative
comparisons made between the alternatives developed for the site.

3.10 Comment    Geraghty & Miller and the North Bronson PRP Group comments
that the Proposed Plan does not address what sections of CD #30 may need to be
dredged, whether the Rl data will be used to delineate the sediments to be dredged or
whether additional data collection activities will be necessary, and whether the
sediments will need to be dewatered prior to consolidation.

MDEQ Response: The MDEQ agrees that this information and any further studies
needed to identify the precise requirements for dredging of CD #30 during remedial
action, should be identified. However, these studies should be identified in the
Statement of Work and not in the ROD.

3.11.  Comment:   Geraghty &. Miller and the North Bronson PRP Group comments
that the Proposed Plan states that an estimated 26,000 cubic yards of soil and sludge
would need to be excavated and consolidated. However, the Proposed Plan does not
address whether the Rl data is sufficient to delineate the extent of soil that needs to be
removed (i.e., to predetermine the extent of soil to be removed), whether any saturated
soils or sludge will need to be dewatered prior to consolidation, and whether any post-
excavation confirmation sampling will be necessary.

MDEQ Response: MDEQ agrees that this information and any further studies needed
to identify the precise requirements for waste consolidation during remedial action,
should be identified. However, these studies should be identified in the Statement of
Work and not in the ROD.

3.12 Comment:    Geraghty & Miller and the North Bronson PRP Group comments
that although the Proposed Plan states that the lagoon area cap does not need to meet
MDEQ or RCRA standards for a hazardous waste landfill, the type of lagoon area cap
required is not identified.

MDEQ Response: See Comment 3.2 above, and MDEQ's Response to that
Comment. Also, see Comment 3.18 below, and  the MDEQ Response to that
Comment.

3.13 Comment:    Geraghty & Miller and the North Bronson PRP Group comments
that a dewatering of the WLs should not be conducted prior to consolidation of soil,
sludge, and sediment, unless it is determined during the remedial design that
dewatering is necessary to meet certain geotechnical requirements established for the
subbase layers which will underlie the lagoon cover system.  The WLs contain standing
water because the water table in this area of the  site is above the bottom of the
lagoons.  As a result, temporary removal of the standing water, if technically feasible,
will  not create a dry disposal cell. Thus, dewatering of the WLs prior to waste
consolidation would not provide any long-term remedial benefits. Dewatering of the

-------
lagoons should only be considered if the engineering design of the lagoon cover
necessitates specific compaction requirements for the subbase layers.  The ROD
should state that the necessity for dewatering of the WLs will be determined during
remedial design based on the subbase compaction requirements established for the
lagoon cover.

MDEQ Response: MDEQ agrees that this information on dewatering of the lagoons
and any further studies needed during remedial action should be identified.  However,
these studies should be identified in the Statement of Work not in the ROD.

3.14.  Comment:   Geraghty & Miller and the North Bronson PRP Group comments
that because the majority of the  waste is below the water table in the WLs, dewatering
of the sediments from CD #30 and any saturated soils removed from the EL area, prior
to their consolidation in the WLs, would not provide any significant remedial benefits.
The ROD should state that the necessity for dewatering the sediments and saturated
soils prior to their consolidation into the WLs will be determined during remedial design
based on the subbase compaction requirements established for the lagoon cover.

MDEQ Response: MDEQ agrees that information on possible dewatering of CD #30
sediment and saturated soils, together with information on any further study needed
during remedial design to identify the precise requirements for dewatering during
remedial action, should be identified in the Statement of Work not in the ROD.

3.15 Comment:   Geraghty & Miller and the North Bronson PRP Group comments
that the Proposed  Plan indicates that each alternative considered for the site includes
further characterization of impacted areas which may be required to further refine the
horizontal and vertical extent of soil, sludge, and groundwater contamination in the
source areas.  However, the scope of any such additional characterization activities,
and the use of the additional characterization data in refining the site remedy as
appropriate, is not addressed in  the Proposed Plan. In this context, it is important to
note that the Proposed Plan developed for the site is based on Rl data collected
between September 1988 and December 1991. Because the nature and extent of
contamination in the subsurface can change over time as a result of various biological,
chemical, and physical processes, the data collected six to nine years ago during the Rl
may no longer be representative of current site conditions, especially with respect to
groundwater quality. To provide an appropriate level of environmental response, the
remedial components required for a site must be designed to address current
environmental conditions.  It is probable that the groundwater data collected during the
Rl does not accurately represent current groundwater conditions.

Besides the fact that the available groundwater data is six to nine years old, the validity
of the groundwater data from the Rl must also be considered. As addressed previously
by Geraghty & Miller in the "Assessment of Potential Surface Water Impacts Associated
with Vented Groundwater," which was submitted to the MDEQ on March 14, 1996,
there are significant inconsistencies in the groundwater analytical results for the WL

-------
 lagoon area collected during the Rl. The maximum reported concentrations of cyanide
 and zinc in the WL area groundwater greatly influence MDEQ's estimated exposure
 point concentrations, which in turn are used by the MDEQ to support the need for active
 groundwater remediation measures. However, these maximum concentrations may not
 be valid. For example, cyanide was detected in Monitoring Well MW-6S at a
 concentration of 2,960 micrograms per liter (jag/L) in September 1989 (the first
 groundwater sampling event during the Rl). Monitoring Well MW-6S was resampled in
 December 1991 during the second sampling event of the Rl, and cyanide was found at
 a concentration of only 250 ng/L (a full order of magnitude lower than the concentration
 reported in 1989). The highest reported concentration of cyanide in the other wells
 comprising the WL area well network was 45.6 ng/L at Monitoring Well MW-5 in
 September 1989.  Similar inconsistencies involving the analytical results reported for
 zinc are also evident.  For example, zinc concentrations in Monitoring Well MW-4 (one
 of the pre-RI wells) were reported as 8,800 ng/L in September 1989 and 846 jig/L in
 December 1991. Yet in Monitoring Wells MW-8S and MW-8D, which were installed
 during the Rl immediately adjacent to Monitoring Well MW-4, the highest reported
 concentration of zinc was only 102 jjg/L (Monitoring Well  MW-8D in September 1989).
 Based on these significant inconsistencies, the groundwater data for zinc and cyanide,
 as well as for other inorganics, in the WL area may not be reliable.

 Based on the above discussion, it is apparent that additional groundwater monitoring
 should be conducted prior to remedy design and implementation. Additional
 groundwater monitoring should be conducted as part of a predesign investigation
 program. The results of the additional groundwater monitoring should be assessed
 relative to the groundwater cleanup objectives to determine if active groundwater
 remediation measures are warranted.  If it is determined that the groundwater cleanup
 objectives are not exceeded at the point of compliance (i.e., at the groundwater/surface
water interface), then active groundwater remediation measures will not be necessary.
The ROD should identify the requirements for predesign groundwater monitoring, and
 state clearly that the necessity for active groundwater remediation measures  will be re-
evaluated based on the results of the predesign groundwater monitoring program.

MDEQ Response: The MDEQ agrees with the predesign study recommendations as
presented in these comments, and agrees that these studies should be conducted prior
 to implementing the remedy.

 3.16. Comment:   Geraghty & Miller and the North Bronson PRP Group comments
that the  Proposed Plan fails to qualify the validity of the estimated risk levels. As
 reflected by the comments on the Baseline Risk Assessment (BRA) submitted by
 Geraghty & Miller and Environmental Standards, Inc. (ES) on behalf of the North
 Bronson PRP Group on September 6,  1995, the conclusions reached from the BRA are
technically flawed (Geraghty & Miller 1995).  A detailed review of the BRA by ES
 revealed that the BRA is notably inconsistent with current regulatory policies and

-------
agency guidelines and that the baseline risk levels were calculated based on
inappropriate and significantly conservative assumptions.

Due to significant concerns over the technical validity of the BRA, the North Bronson
PRP Group directed ES to conduct a site-specific risk assessment for site. The site-
specific risk assessment was conducted using more scientifically valid methodology and
realistic exposure assumptions than used in the BRA. The findings from the site-specific
risk assessment (ES 1996) were submitted to the MDEQ on September 6, 1996.  The
conclusions reached from the site-specific risk assessment conducted by ES clearly
indicate that the risk levels presented in the BRA, and summarized in the Proposed
Plan, significantly overestimate the risks associated with current and potential future
exposure to contaminated media at the site. The conclusions of the site-specific risk
assessment (ES  1996) should be discussed and acknowledged in the ROD and relied
upon to select the final remedy.
       Response: The MDEQ toxicology unit reviewed the site-specific risk
assessment conducted by ES. In summary, the MDEQ concluded that the site-specific
risk-based Remedial Action Objectives developed by ES were not appropriately
derived, considering that some of the methods used by ES conflict with recommended
EPA guidance.  The review conducted by the MDEQ toxicologist will be incorporated
'nto the administrative record. If data collected during the predesign studies indicates a
different level of risk than found in the BRA, a review of the risk and the potential impact
on the remedy will, of course, be considered.

3.17.  Comment:   Geraghty & Miller and the North Bronson PRP Group comments
that implementation of the treatment wetland should proceed only if it is determined that
groundwater treatment is necessary, and that other more cost-effective treatment
methods cannot be utilized.

If the results of the predesign groundwater monitoring program substantiate the need
for active groundwater remediation, the remedial design should include a re-
assessment of groundwater treatment options. This assessment should include an
evaluation of direct discharge to the Bronson POTW in comparison to wetland
treatment technologies.  Direct discharge to the Bronson POTW may be equally
protective while  providing more cost-effective treatment because it is unlikely that
pretreatment would be required and because the POTW is located in close proximity to
the WLs.  This discharge arrangement would require the approval of the Bronson
  OTW. Representatives of the Bronson POTW have previously indicated that they
would prefer not to accept direct discharge of the recovered groundwater. However,
the Bronson POTW was upgraded in 1 994 and now has excess treatment capacity of
approximately 300 to 400 gallons per minute.  In addition,  the city of Bronson is a PRP
for the site,  and  acceptance of direct discharge to the Bronson POTW would be one
way for the  city of Bronson to provide in-kind services for meeting its obligations as a
PRP.  An engineering evaluation  to assess whether the direct discharge of recovered
groundwater would adversely impact operations at the POTW has not be conducted.  If

-------
 warranted, based on the predesign groundwater data, such an evaluation should be
 conducted and submitted to the Branson POTW as part of the remedial design.

 If it is determined that active groundwater remediation measures are warranted, and
 that direct discharge to the Bronson POTW is not a viable option, then the specific type
 of wetland treatment to be used should be evaluated as part of the remedial design.
 The evaluation of wetland treatment options presented in the FS Addendum (MDEQ
 1996a) assumed the use of a subsurface flow wetland system. As part of the remedial
 design, the use of a free water surface wetland system should also be evaluated. The
 specific type of wetland treatment system to be used, if any, should be determined
 based on the groundwater conditions determined from the pre-design groundwater
 monitoring program and the corresponding treatment efficiencies necessary to meet the
 applicable discharge standards.

 Based on the above discussion, it is recommended that the ROD include a provision for
 evaluating the necessity of active groundwater remediation measures based on the
 results of the predesign groundwater monitoring program. The ROD should also
 include a provision for evaluating and selecting a protective and cost-effective
 groundwater treatment method, including potential direct discharge to the Bronson
 POTW, if it is determined that active groundwater remediation measures are warranted.
 To accomplish this, the ROD should specify the  requirements for conducting a
 predesign  groundwater monitoring program and evaluating the need for active
 groundwater remediation based on  the results of the monitoring program. The ROD
 should further state that, if active groundwater remediation is warranted based on the
 results of the predesign groundwater monitoring program, groundwater treatment will be
 achieved either by direct discharge  to the Bronson POTW or through the use of a
 constructed wetland treatment cell.  This dual provisional treatment option approach
 has been effectively incorporated into other RODs, including the Fort Wayne Reduction
 Site in Fort Wayne,  Indiana, and should be incorporated into the ROD for this  site.

 MDEQ Response:  The MDEQ agrees with  this assessment and the recommendations
 and is willing to consider the possibility of direct discharge to a POTW. However, a
 representative of Bronson POTW and the Bronson City manager have been, as
 members of the Community Advisory Group, informed participants of the decision
 making process.  Up to this point, they have not been willing to use the POTW to treat
lagoon contaminated groundwater.

  18.  Comment:   Geraghty & Miller and the North Bronson PRP Group comments
that use of a Part 115, Type III Landfill Cap for the WL area is not appropriate given the
 required function  of the lagoon area cover.  The required function of the lagoon area
cover is to prevent direct contact exposure to the buried material. Page 9 of the
 Proposed Plan states that, "because the waste is below the water table, preventing the
 infiltration of rainwater through the waste is not an objective of the remedy." As a
 result, the  primary objective of the surface cover to be placed over the material to be
consolidated in the WLs is to minimize the potential for direct contact with the buried

-------
material. This objective can adequately be met by an engineered soil cover that could
be implemented more cost-effectively than a Part 115, Type III Landfill Cap. An
engineered soil cover can typically accommodate a certain degree of differential
settlement without compromising its ability to minimize the potential for direct contact
with buried waste material. Thus, certain geotechnical requirements, such as
dewatering and compacting the lower subbase material (e.g., residual sludge within the
WLs), may not be necessary if a soil cover is used for the lagoon area.  Thus, the ROD
should allow for the use of an engineered soil cover in lieu of a low permeability landfill
cap.

MDEQ Response: The MDEQ agrees with this assessment and the
recommendations.  To avoid confusion in the ROD, the "cap" will be referred to as an
"engineered soil cover."

3.19.  Comment:  Geraghty & Miller and the North Branson PRP Group comments
that for several constituents of concern, the listed cleanup goal for the protection of
human health represents the soil background concentration, even though the MDEQ
industrial direct contact criteria is higher than the soil background concentration
(reference Table  2-2 of the FS Addendum).  The use of background concentrations for
soil and sludge cleanup objectives should only be used if the background concentration
for a parti' 'ilar constituent exceeds either the cleanup goal for the protection of
groundwaier or MDEQ's direct contact criteria.

MDEQ Response: The site is adjacent to CD #30 where there is a potential for
contamination of surface water and sediments by erosion and overland flow into CD
#30. Protection of surface water values and direct contact values typically exceed
surface water or sediment protection values. Therefore, background concentrations
were identified as surface soil cleanup goals for soils in close proximity to the drain (i.e.
within the flood plain). This action will help prevent the off-site migration of
contaminants via CD  #30 surface water and, the recontamination of sediment in the
drain.

3.20 Comment:   Geraghty & Miller and the North Bronson PRP Group comments
that no documentation is provided to support the validity of the estimated costs (i.e., an
itemized breakdown of estimated  quantities and unit prices is not provided).  Although
some cost documentation is presented in the FS (Montgomery Watson  1995), it is not
directly applicable to the proposed remedy because certain aspects of the proposed
• -—>edy differ from the remedial alternatives developed and estimated in the FS.  For
   i.-nple, the Proposed Plan indicates the cost to excavate the EL area soil and
consolidate the soils into the WLs, without treatment, is $450,000.  However, there  are
no details provided in the Proposed Plan, FS, or FS Addendum to substantiate what
items are included under this cost estimate. As a result, it is unknown whether the
$450,000 cost estimate for the EL soils includes costs for soil delineation sampling  and
analysis, soil transportation, shoring to support  the Bronson Plating  building foundation,
dewatering (if needed), backfilling, revegetation, etc.

-------
 Without the benefit of a fully documented cost estimate, the North Bronson PRP Group
 is unable to assess the validity of the estimated costs for implementing the proposed
 remedy.  To facilitate such an assessment, it is requested that the MDEQ provide an
 itemized cost estimate for the remedial elements that comprise the Proposed Plan.  It is
 further requested that the PRP Group be given an opportunity to comment on any
 issues raised by the PRP Group's review of the estimated costs prior to final remedy
 selection.

 MDEQ Response: Cost estimates for the Proposed Plan were extracted from the cost
 estimates for each alternative developed in the FS.  For example, excavating and
 treating lagoon waste (EL4 & WL 4) was developed as an alternative for the site.
 Costs for this alternative were itemized in the FS.  Included in the itemized costs were
 the estimated costs for excavating the lagoons. The cost developed for excavating the
 ELs in the FS (EL4) was used to estimate the cost for excavating the lagoons in the
 Proposed Plan.

 The MDEQ will provide a more detailed cost estimate based on the information
 available and will also include costs estimates for any element of the remedy that was
 not developed in the FS (i.e. soil cover).  Refer to  the section "Site-wide Alternatives,
 Cost" in the ROD.  The MDEQ will not, however, delay the ROD. If post ROD cost
 estimates significantly exceed Proposed Plan estimates, or if another alternative
 appears more cost-effective, the MDEQ will consider amending the ROD.

 3.21.  Comment:   Geraghty & Miller and the North Bronson PRP Group comments
that the Proposed Plan does not state where the public can review the Administrative
 Record File.  It is important for the public to know about the Administrative Record File
because it contains, or should contain, all documents relating to the project, not just
those documents prepared by the MDEQ and EPA.  These include documents
prepared under the direction of the North Bronson PRP Group. The Administrative
Record Index has been reviewed to check if the applicable documents submitted on
behalf of the North Bronson PRP Group have been incorporated  into the Administrative
Record. One document submitted on behalf of the North Bronson PRP Group, but not
listed on the Administrative Record Index, is the "Development of Site-Specific Risk-
Based Cleanup Goals for the North Bronson Superfund Site" (ES 1996).  This is a very
important and relevant document because it presents the findings from the site-specific
risk assessment which was conducted using more scientifically valid methodology and
realistic exposure assumptions than used in the BRA (Warzyn  1993). As a result, this
Document must be entered into the Administrative Record.

MDEQ Response:  The Administrative Record will be amended to correct this
oversight.  The index is available in the Bronson Public Library. Specific documents
may be available for review in the library file or on file at the  MDEQ,  Superfund Section
offices located at 301 S. Capitol, Lansing, Michigan.

-------
3.22. Comment:   The LA Darling Company comments that although the Rl data
indicates that the main source, or sources, of chlorinated organics in groundwater at the
site are located upgradient from the WL and EL areas, the available data is not
sufficient to identify individual sources of these contaminants.

Only one groundwater sampling event, in December, 1991, was conducted during the
Rl in which chlorinated organics were analyzed for in groundwater samples collected
from monitoring wells located at, or near, the LA Darling property.  During the
December 1991 sampling event, total chlorinated organics were measured at a
concentration of 60,200 micrograms per liter (jag/L) in Monitoring Well MW-20 at the
Scott Fetzer property.  During this same sampling event, total chlorinated organics were
measured at a concentration of 2,600 ng/L in Monitoring Well MW-21  at the LA Darling
property. Thus, the concentration of total chlorinated organics measured at the LA
Darling property monitoring well were more than one order of magnitude lower than the
concentration of total chlorinated organics measured at the Scott Fetzer property
monitoring well. Further, one groundwater sampling result is a wholly insufficient
technical basis on which to conclude whether the former LA Darling property is a source
of any contamination at the site.

Based on the water table elevation data collected during the Rl,  it appears that
Monitoring Well MW-21 (the LA Darling property well) is  currently either upgradient or
side-gradient of Monitoring Well MW-20 (the Scott Fetzer property well) (reference
Figure 3-6 in the Rl report).  However, due to historical groundwater pumpage across
the site, the hydraulic gradients may have been different in years past. As a result, it is
possible that the chlorinated organic contamination found in the groundwater underlying
the Scott Fetzer property could have contributed to the chlorinated organic
contamination found in the groundwater underlying the former LA Darling property.
There are no monitoring wells between the Scott Fetzer  property and the LA Darling
property which could be used to assess the concentration gradients between these two
areas.  Absent such data, and together with the extremely limited groundwater data
available, LA Darling strongly objects to and challenges  the Proposed Plan's conclusion
concerning the source status of the former LA Darling property.

Based on the above discussion, it is apparent that sufficient data is not available to
definitively identify the  LA Darling property as a source of chlorinated organic
compounds at the site.  Absent a sufficient technical basis, the Proposed Plan properly
should  not conclude that the  main source of chlorinated  organic compounds appears to
  .; soils beneath the former LA Darling property. LA Darling was proud to be a member
of the industrial community in Bronson, and to work with many of its residents, for
several years.  The MDEQ and the EPA should more carefully and soundly exercise its
technical judgment before speculating in such a way which threatens to adversely effect
LA Darling's reputation in the community.

-------
 LA Darling submits that the Proposed Plan properly should be revised to delete any
 conclusions concerning the former LA Darling property. Moreover, there is no apparent
 reason why any such conclusions concerning the source status of the former LA Darling
 property need to be included in the Proposed Plan.  The subject property is located well
 outside of the boundaries of the site addressed in the Proposed Plan for purposes of
 selecting a final remedy. At the least, for purposes of the  Proposed Plan or ROD, it is
 premature and unnecessary to attempt to determine whether or not the former LA
 Darling  property is in any way a contributing source. This is not a finding that is or
 should be relied upon in the Proposed Plan as a supporting consideration for the
 proposed remedy.  Hence, its deletion will not in any way affect this remedy selection
 process.

 MDEQ Response: The MDEQ agrees that there is not enough data to definitively
 identify the former LA Darling property as a source of TCE at the site.  However, based
 on the data and information that is available, the LA Darting property cannot be ruled
 out as a potential source of TCE either.

 LA Darling manufactured display fixtures and retail shelving, which reportedly included
 chromium and cadmium plating operations.  It was also reported in the industrial survey
 that LA Darling disposed of liquid wastes in their own lagoons until 1939, at which time
 LA Darling was connected via an industrial sewer line to the western lagoons operated
 by the city ofBronson. LA Darling switched disposal to the eastern lagoons (via an
 industrial sewer line) in 1949 which continued until 1966 when they ceased operations
 in Bronson.

 TCE is a very common industrial solvent that came into general use in the 1940s.  LA
 Darling, along with several other companies in the area has been identified as having
 used TCE.

 In the Proposed Plan, the MDEQ identified the industrial sewer as a potential source of
 contamination. The decision to carry out further investigation of the industrial sewer was
based on (1) the type and concentrations of contaminants detected in the soil and
groundwater around and beneath the sewer,(2) reports that the sewer would on
 occasion back up, (3) the likelihood that the sewer would leak during routine use, and
 (4) the certainty that the sewer would leak if overloaded.

Based on this information it is appropriate for the MDEQ to identify the former LA
Darling property in the Proposed Plan as a  potential source of contamination at the site
because this identifies one of the areas which must be investigated further.

-------
                                       APPENDIX B

                       North Bronson Industrial Area Superfund Site
                                Administrative Record Index
 Date: 2-13-97

 Title: (Review of Bronson Plating Co.)
 Type: Correspondence
 Category: A1 Gen Correspondence
 Author: Gary Klepper
 Recipient: Problem Evaluation Committee
Date 9-8-90

Title: (Groundwater Monitoring System Assessment)
Type: Correspondence
Category:  A1 General Correspondence
Author:. Jennifer Daniels, Water Quality Division
Recipient: Ron Waybrant, Env. Enforcement Division
Date: 5-85

Title: (Polluter's Attempt to Skirt Law Foiled (magazine article))
Type. Correspondence
Category: A1 Gen Correspondence
Author: None
Recipient: None
Date: 5-10-85

Title: (Special Conditions for CD#30 Sediment Removal Plan)
Type: Correspondence
Category. A1 Gen Correspondence
Author: Paul Zugger, SWQD
Recipient: Stanley Welch
Date: 12-20-84

Title:(CD #30 Cleanup)
Type: Correspondence
Category: Al Gen Correspondence
Author: Steve Eldridge, SWQD
Recipient: Bob Basch, Hazardous Waste Division
Date: 12-17-84

Title:(Analytical Results from CD#30 Sediment Samples)
Type: Correspondence
Category: AI Gen Correspondence
Author: Steve Eldridge, SWQD
Recipient: Stanley Welch

-------
 Date: 11-26-84

 Title:(Approval to Consolidate Waste Material)
 Type: Correspondence
 Category: AI Gen Correspondence
 Author: Thomas Bailey, Hazardous Waste Division
 Recipient: Stanley Welch
Date: 11-14-84

Title:(CD£30 Observations )
Type: Correspondence
Category: A1 Gen Correspondence
Author: none
Recipient: None
Date: 10-26-84

Title:(Performance Evaluation Report)
Type: Correspondence
Category: A1 Gen Correspondence
Author: Charles Sutfin, Water Division
Recipient: Stanley Welch
Date: 7-13-84

Title:(Performance Evaluation Report)
Type: Correspondence
Category: Al Gen Correspondence
Author: None
Recipient: None
Date: 7-5-84

Title:(Comments and Recommendations on Hydrogeologic Study)
Type: Correspondence
Category: AI Gen Correspondence
Author: Daniel O. Commins, Geologist, GWQD
Recipient: Ron Kooisrra, Supervisor, GWQD
Date: 4-84

Title:(Point Source Studies Inspection Sheet)
Type: Correspondence
Category: Al  Gen Correspondence
Author: None
Recipient: None

-------
 Date: 3-23-84

 Title:(Compliance Evaluation Inspection)
 Type: Correspondence
 Category: A1 Gen Correspondence
 Author: Jeffrey Braunscheidel, water Quality Specialist, SWQD
 Recipient: Stanley Welch, President, Bronson Plating
Date: 1-11-84

Title:(Effluent Guidelines for Metal Finishing)
Type: Correspondence
Category: A1 Gen Correspondence
Author: Diane Carlson, Treatment Technology Unit
Recipient: Chang Bek, Chief, Industrial Permit Unit
Date: 1-4-84                              •

Title:(Point Source Discharges to Long and Palmer Lakes)
Type: Correspondence
Category: A1 Gen Correspondence
Author. Karl Hosford, Chief, Div. of Land Resource Programs
Recipient: Paul Zugger, Chief, SWQD
Date: 10-5-83

Title:(Summary of Compliance Evaluation Inspection)
Type: Correspondence
Category: AI Gen Correspondence
Author: Patricia McKay, SWQD
Recipient: Bronson Plating
Date: 7-15-83

Title:(EPA Regulations Impacting Metal Finishing Manufacturers)
Type: Correspondence
Category: A1 Gen Correspondence
Author: None
Recipient. None
Date: 7-82

Title:(Michigan Water Resources Commission Facility Inspection Report)
Type: Correspondence
Category: A1  Gen Correspondence
Author: None
Recipient: None

-------
Date: 11-3-81

Tit!e:(Comments from WQD to Scon Fetzer Co.)
Type: Correspondence
Category: Al Gen Correspondence
Author: Roger Jones WQD
Recipient: N.P. Strobel
Date: 8-4-81

Title:(Response to Mr. Welch's 7-29-81 letter)
Type: Correspondence
Category: AI Gen Correspondence
Author: Roger Jones, District II WQD
Recipient: Thomas Newell, Acting District Engineer
Date. 6-1-81

Title:(Response to Mr. Jones' Letter of March  10,1981)
Type: Correspondence
Category: A1  Gen Correspondence
Author: N.P. Strobel, Douglas Division
Recipient: Roger Jones, Water Quality Specialist
Date: 5-4-81

Title:(Report of an industrial Waste Water Survey and Point Source Studies Inspection Sheet)
Type: Correspondence
Category: A1 Gen Correspondence
Author: EPB Point Source Studies Section
Recipient: none

Date: 4-8-81

Title:(On-going TSCA Cooperative Agreement)
Type. Correspondence
Category: A1 Gen Correspondence
Author: Carolyn Hesse, Health Effects Specialist
Recipient: Karl Bremmer, Toxic Materials Branch

Date: 3-12-81

Title:(Order to Withdraw Complaint)
Type: Correspondence
Category: AI Gen Correspondence
Author: Sandra S. Gardebring, Director, Enforcement Division
Recipient: EPA

-------
 Date: 1-27-81

 Title:(Ana!yses of Waste Water Samples)
 Type: Correspondence
 Category. Al Gen Correspondence
 Author: Thomas Newell, Acting District Engineer
 Recipient: Stanley Welch
Date: 10-27-80

Title:(N. P. Stobel's letter to Thomas Newell and WQD)
Type: Correspondence
Category: A1 Gen Correspondence
Author: N.P. Strobel
Recipient: Thomas Newell
Date: 7-8-80

Title: (Recommended water quality based effluent limit objectives for facilities discharging to Swan
      Creek via CD #30)
Type: Correspondence
Category: A1  Site Background: General Correspondence
Author: John  Wuycheck, Biology Section , Water Quality Division
Recipient: Comprehensive Studies Section, Environmental Services Division

 Jate 11-80

Title: (Summary of Results key)
Type: Correspondence
Category: Al  General Correspondence
Author: None
Recipient: None

Date: 11-18-80

Title: (Letter informing elimination of discharges through outlet #002)
Category: A1  General Correspondence
Type: Correspondence
Author: Stanley Welch, President, Bronson Plating
Recipient: Roger Jones, MDNR, water quality division

-------
Date: 10-22-80

Title: (Bronson Plating Needs)
Type:  Correspondence
Category: Al General Correspondence
Author: R. Waybram, Coordinator, Groundwater Contamination Task Force
Recipient: C. Weaver,  W. Busby, & R. Jones

Date: 9-3-80

Title: (Visit to Union City Industries and Bronson Plating)
Type: Correspondence
Category: A1 Gen. Correspondence
Author: Roger Jones, District II, Water Quality Division
Recipient: Tom Hicks/ Tom Newell, District II, Water Quality Division

Date: 8-80

Title: (Preliminary Permit Briefing Memo)
Type: Correspondance
Category: A1 Gen Correspondence
Author: None
Recipient: None

Date: 8-25-80

Title: (Analyses of Samples from Bronson Plating and Union City Industries)
Type: Correspondence
Category: Gen Correspondence
Author: Roger Jones, District II, WQD
Recipient: Tom Hicks/ Tom Newell

Date: 7-25-80                                                       ~

Title: (Sample results from  Bronson Plating)
Type: Correspondence
Category: A1 Gen Correspondence
Author: Roger Jones, WQD
Recipient: Stanley Welch, President, Bronson Plating

Date: 4-28-80

Title: (Survey of Swan Creek and CD#30 in Bronson, MI)
Type: Correspondence
Category: A1 Gen Correspondence
Author: MDNR office of Toxic Materials Control
Recipient: None

-------
 Date: 4-7-80

 Title: (Comparison of Water Sample Results)
 Type: Correspondence
 Category: AI Gen Correspondence
 Author: Stanley Welch, president, Bronson Plating
 Recipient: Roger Jones, WQD
Date: 11-8-79

Title: (Report of an Industrial Waste Water Survey)
Type: Correspondence
Category: Al Gen Correspondence
Author: None
Recipient: None
Date: 9-12-79

Title: (Interim Phase I Report, Electroplating Waste Water Sludge Characterization)
Type: Correspondence
Category: AI Gen Correspondence
Author: None
Recipient: General Public

Date: 8-27-79

Title: (Results of Waste Water Survey At Bronson Plating)
Type: Correspondence
Category: A1 Gen Correspondence
Author: Roger Jones,  WQD
Recipient: Stanley Welch, President, Bronson Plating

Date: 3-26-79

Title: (Report of an Industrial Waste Water Survey)
Type: Correspondence
Category: AI Gen Correspondence
Author: None
Recipient: None	
Date: 11-78

Title: (Michigan Water Resources Commission Facility Inspection Report)
Type: Correspondence
Category: A1 Gen Correspondence
Author: None
Recipient: None

-------
Date: 3-14-78

Title: (Report of an Industrial Waste Water Survey)
Type: Correspondence
Category: AI Gen Correspondence
Author: None
Recipient: None
Date: 4-5-77

Title: (Report of an Industrial Waste Water Survey)
Type: Correspondence
Category: A1 Gen Correspondence
Author: None
Recipient. None
Date: 3-5-76

Title: (Late Results from Waste Water Survey)
Type: Correspondence
Category: A)  Gen Correspondence
Author: David Rymph
Recipient: Zollner and Harvey
Date: 11-14-74

Title: (Water Well Contamination Complaint)
Type: Correspondence
Category: AI Gen Correspondence
Author: K..E. Childs. Geologist
Recipient: Robert Babcock, Bureau of Water Management
Date: 8-9-74

Title: (Compliance Monitoring Report)
Type: Correspondence
Category: A1 Gen Correspondence
Author: USEPA
Recipient: None
Date 8-7-74

Title: (EPA Results of field and laboratory analyses of samples)
Type: Correspondence
Category: A1 Gen Correspondence
Author: Buckley
Recipient: Gary Guenther

-------
 Date:

 Title:(Residential Water Supply Sample Results)
 Type: Correspondence
 Category1: AI Gen Correspondence
 Author: Joseph Lovato, Ground Water Quality Control
 Recipient: Mike Stevens, District Health Dept.
Date:

Title:(Comments Regarding permit for Scott Fetzer Co.)
Type: Correspondence
Category: AI Gen Correspondence
Author: Office of Toxic Materials
Recipient: N.P. Strobe!
Date:

Title:(Ground-water Contamination and Legal Controls in Michigan)
Type: Correspondence
Category: A1 Gen Correspondence
Author: Morris Deutsch, U.S. Department of Interior
Recipient: none
Date: 9-19-90

Title:(North Bronson Site Access Restrictions)
Type: Correspondence
Category: A4 -Site DesCriptions/Chronologies/Backgrounds
Author: Brady Boyce
Recipient: Kerbawy/ Bradford/' Hogarth
Date: 3-90

Title:(EPA  North Bronson Industrial Area Site Description)
Type: Correspondence
Category: A4 -Site Descriptions/Chronologies/Backgrounds
Author: EPA
Recipient: None
Date: 10-6-88
                               I
Title:(Biological Survey of CD#30 and Swan Creek)
Type: Correspondence
Category: A4 -Site DesCriptions/Chronologies/Backgrounds
 \uthor. SWQD
Recipient: none

-------
Date: 3-22-85

Tille:(Response to Letter Joseph Polito. Lawyer)
Type: Correspondence
Category: A5 -Act 307 Listings
Author: Denise Gruben, Site Assessment Unit, Remedial Action Section, GWQD
Recipient: Joseph Polito, Honigmaji, Miller, Swartz, and Cohn

Date: 4-9-85

Title:(Ana)ytical Results for samples submitted by Bronson Plating)
Type: Correspondence
Category: BI -Preremedial Site Indentification
Author: Snell Environmental Group
Recipient: Stanely Welch

Date: 3-18-85

Title:(County Drain #30 Project-Final Order of Abatement on Consent #2051- Excavation Summary)
Type: Correspondence
Category: A4 -Site Descriptions/Chronologies/Backgrounds
Author: Site Assessment Unit, Groundwater Quality Division
Recipient: none

Date: 7-84                                                                       ~~

Title:(Site Survey, Bronson Plating Co.)
Type: Correspondence
Category: A5 -Act 307 Listings
Author: None
Recipient: None

Date: 9-22-93

Title:(Site Assessment Report, North Bronson Industrial area site)
Type: Correspondence
Category: B4 -Preliminary Assessments and Site Inspection Reports
Author: Ecology and Environment Inc.
Recipient: Brady Boyce

Date: 9-13-93

Title:(Residential Well Sample Results, Organic and Inorganic Data)
Type: Correspondence
Category: B4 -Preliminary Assessments and Site Inspection Reports
Author: Joseph Crigier, Division of Water Supply
Recipient: Mary Tierney,  Remedial Project Manager

-------
 Date: 7-7-93

 Title:(Organic Data Quality Assurance Review)
 Type: Correspondence
 Category: B4 -Preliminary Assessments and Site Inspection Reports
 Author: Phil Korzenecki, TAT-Chemist, E&E, Chicago, IL
 Recipient: Raghu Nagam. Project Manager, E&E, Chicago, IL
Date: 5-6-93

Title:(Preliminary Report of 4 samples taken 4-28-93)
Type: Correspondence
Category: B4 -Preliminary Assessments and Site Inspection Reports
Author: E&E
Recipient: Mary Jane Ripp
Date: 6-15-84
                                                           «

Title:(HRS Report)
Type: Correspondence
Category: B4 -Preliminary Assessments and Site Inspection Reports
Author: John Tanaka
Recipient: USEPA Region V
     7-7-84
Title:( North Bronson Site Inspection)
Type: Correspondence
category: B4 -Preliminary Assessments and Site Inspection Reports
Author: Edward Dettmann, Ecology and the Environment
Recipient: U.S. EPA Region  V
Date: 4-20-83

Title:(Preliminary Assessment)
Type: Correspondence
Category: 84 -Preliminary Assessments and Site Inspection Reports
Author: Tom Pachowicz
Recipient: USEPA Region V
Date: 2-20-96

Title:(Summary of the North Bronson Industrial Area Superfund Site General Information Meeting
Between the Michigan Department of Environmental Quality, the U.S. Environmental Protection Agency,
:ip': he Site Potentially Responsible Party Group. Final)
; > po: vJorrespondence
Category: C3 - PRP Specific Documents
Author: Bill  Harmon, MDEQ
Recipient: EPA, MDEQ and Consultants

-------
 Date: 3-18-94

 Title:(Administrative Order On Consent for the Universal Components Corporation)
 Type: Enforcement
 Category: C3 - PRP Specific Documents
 Author: U.S. EPA
 Recipient: Brady Boyce, MDEQ, Superfund; Mr. Al Ports, Universal Components; Mr. Charles Barbieri,
 Foster, Swift, Collins and Smith, P.C.

 Date: 4-86

 Title:(Letter from EPA, PRP Notification)
 Type: Correspondence
 Category: C3 - PRP Specific Documents
 Author: U.S. EPA
 Recipient: City of Branson

 Date: 9-7-93

 Title:(Letter From Mary Tiemey, EPA to Brady Boyce, MDEQ Re: Site Assessment Report North Bronson
 Industrial Area Site)
 Type: Removal Action
 Category: E3-Operational Documents
 Author: U.S. EPA
 Recipient: MDEQ

 Date: 8-30-96

 Title:(Development of Site-specific, RJsk-based Cleanup Goals for the North Bronson Superfund Site )
Type: PRP or Agency Work Plans
Category: F4-Decumentation of Technical Discussions with PRP or Agency Work Plans
Author: Environmental Standards, Inc.
 Recipient: North Bronson Superfund Site PRP Group

Date: 8-14-81
Title:(Administrative Order On Consent)
Type: Enforcement
Category: F5-Negotiations/Legal Issues
Author: U.S. EPA
 Recipient:

Date: 4-89

Title:(Phase II Scope of Work and Cost Estimate)
Type: Factual Information/Data
 Category: F7-Cost Recovery/Scope of Work
 Author: Warzyn Engineering, Inc.
 Recipient: Brady Boyce, MDEQ, Superfund

-------
 Date: 8-15-86

 Title:(Site Status)
 Type: Factual Information
 Category: F5-Negotiations/Legal Issues
 Author: MDNR
 Recipient:
Date: 11-8-91
Title:(Revised QAPP)
Type: Factual Information/Planning
Category: G2-Remedial Investigation Planning/ Technical Planning
Author: Warzyn Engineering, Inc.
Recipient: MDNR
Date: 9-23-91

Title:(Work Plan Addendum North Bronson Industrial Area Rl/FS)
Type: Factual Information/Planning/Data
Category: G2-Remedial Investigation Planning/Technical Planning
Author: Warzyn Engineering, Inc.
Recipient: MDNR
Date: 1-23-89

      industrial Survey Notes; Operation and Maintenance Manual for Wastewater; Treatment Plant
Additions City of Bronson, Michigan)
Type: Factual Inforrnation/PIanning/Data
Category: G2- Remedial Investigation Planning/' Technical Planning
Author: Warzyn Engineering. Inc.
Recipient. Brady Boyce MDEQ

Date: 7-21-88

Title:( North Bronson Industrial Area Site Health and Safety Plan )
Type: Factual Information/Data
Category: G3- Operational Planning Documents
Author: Warzyn Engineering, Inc.
Recipient: MDEQ

Date: 10-12-95

Title:(US EPA Personal Communication to MDEQ Re: North Bronson Industrial Area Superfund Site
Boundaries incorporating the Industrial Sewer)
Type: Factual Information/Data/Planning
  . .-gory: H) General Correspondence
Author: U.S. EPA
Recipient: Bill Harmon, MDEQ

-------
Date: 8-2-95
Title:(MDEQ Personal Communication to U.S. EPA Re: MDNR delay of the proposed plan
(CA#V0056340I) for theNorth Bronson Industrial Area Superfund)
Type: Factual Information/Data/Planning
Category: HI  General Correspondence
Author: Bill Harmon, MDEQ
Recipient: Rosit Morena, U.S. EPA

Date: 9-89

Title:(Geotechnical Testing Report)
Type: Factual Information/Data/Planning
Category: H2-Sampling and Analysis Data
Author: CLP Sample Management Office U.S. EPA
Recipient: Viar and Co. Alexandria, Virginia	
Date: 7-89

Title:(RJ Field Investigation Analytical Result: Summary of VOC's and Metals results-All data
(compounds detected and non-detected, Summary of VOC's and Metals results- detected compounds only,
which were validated as useable.)                                           ;
Type: Factual Information/Data/Planning
Category: H2-Sampling and Analysis Data
Author: Warzyn, Inc.
Recipient: Brady Boyce, MDEQ, Superfund

Date: 10-89
Title:(RJ/FS Technical Memorandum Volumes Mil)
Type: Factual Information/Data/PIanning
Category-: H3-Interim  Deliverables/Technical Memoranda
Author: Warzyn, Inc.
Recipient: MDNR/MDEQ

Date: 7-24-97

Title:(Revie\v of the North Bronson Superfund Site: Review of the Development of Site-Specific, Risk-
based Cleanup Goals)
Type: Correspondence
Category: H4- RJ/Risk Assessment/Health Assessment Reports
Author: Jeffrey A. Crum, Toxicologist
Recipient:  Bill Harmon. MDEQ

Date: 1-97

Title:(Public Health Assessment)
Type: Factual Information/Data/Planning
 ,'ateeory: H4- Rl/Risk Assessment/Health Assessment Reports
Author: Michigan Department of Community Health (MDCH)
Recipient

-------
Date: 9-9-96

Title:(Development of Site Specific, Risk-based Cleanup Goals for the North Bronson Superfund Site)
Type: Factual Information/Data/Planning
Category: H4- RJ/Risk Assessment/Health Assessment Reports
Author: Environmental Standards, Inc.
Recipient: North Bronson Superfund Site PRP Group

Date: 9-6-95

Title:(Comments on the Remedial Investigation, Baseline Risk Assessment, and the Feasibility Study)
Type: Factual information/Data/Planning
Category: H4- RJ/Risk Assessment/Health Assessment Reports
Author: Geraghty&Miller
Recipient: MDNR/MDEQ

Date: 7-93

i iile:(Baseline Risk Assessment)
i ype: Factual Information/Data/Planning
Category: H4- RJ/Risk Assessment/Health Assessment Reports
Author: Warzyn, Inc.
Recipient. MDNR/MDEQ

Datr- 7.Q7

l'itle:(Final Feasibility Study Addendum)
Type: Factual Information/Data/Planning
Category: 15- Feasibility Studies
Author: MDEQ
Recipient:

Date: 5-97

Title:(Feasibility Study Addendum)
Type: Factual Information/Data/Planning
Category: 15- Feasibility Studies
Author: MDEQ
Recipient:

Date: 3-27-97

Title:(Constructed Wetlands for Treating Contaminated Groundwater)
Type: Factual Information/Data/Planning
Category: 15- Feasibility Studies
   •i:or: Robert H. Kadlec, Ph.D., P.E., Wetland Management Services
Recipient: MDEQ

-------
 Date: 3-14-97

 Title:(Recommended Revised Remedial Action Objectives Based on Part 201 Amendments)
 Type: Factual Information/Data/Planning
 Category: 15- Feasibility Studies
 Author: Geraghty&Miller
 Recipient: MDNR/MDEQ

 Date: 3-14-97
 Title:(Assessment of Potential Surface Water Impacts associated with Vented Groundwater)
 Type: Factual Information/Data/Planning
 Category: 15- Feasibility Studies
 Author: Geraghty&Miller
 Recipient: MDNR/MDEQ

 Date. 3-14-96

 Title:(Description and Evaluation of Alternate Groundwater Remedies)
 Type: Factual Information/Data/Planning
 Category: 15- Feasibility Studies
 Author: Geraghty&Miller
 Recipient: MDNR/MDEQ

 Date: 5-95

 Title:(Final Feasibility Study)
 Type: Factual Information/Data/Planning
Category: 15- Feasibility Studies
Author: Warzyn, Inc.-Montgomery Watson
Recipient: MDNR/MDEQ

Date: 8-92

Title:(Community Relations Plan)
Type: Community-Public Participation
Category: P2- Community Relations Plans
Author: MDNR-MDEQ
 Recipient: Community

 Date: 12-26-96

Title:(Bronson Superftmd Site Clean-up Options Still Being Investigated-Bronson Journal)
Type: Community-Public Participation
Category: P4-Newspaper Clippings/ Press Releases/Public Notices
 Author: Branson Journal
 Recipient: -Public

-------
 Date: 12-19-96

 Title:(CAG meets, Plans Tour of Superfund Site-Bronson Journal)
 Type: Community-Public Participation
 Category: P4-Newspaper Clippings/ Press Releases/Public Notices
 Author: MDNR-MDEQ
Date: 12-19-96

Title:(CAG meets, Plans Tour of Superfund Site-Bronson Journal)
Type: Community-Public Participation
Category: P4-Newspaper Clippings/ Press Releases/Public Notices
Author: MDNR-MDEQ
Recipient: Bronson Journal-Public
Date: 12-12-96

Title:(Local Citizens Consider Fprming Advisory Group For North Bronson Superfund Site)
Type: Community-Public Participation
Category: P4-Newspaper Clippings/ Press Releases/Public Notices   '
Author: Bronson Journal
Recipient: Public

Date: 12-7-96

Title:(EPA to Present Superfund Idea-Bronson Journal Article)
Type: Community-Public Participation
Category: P4-Newspaper Clippings/ Press Releases/Public Notices
Author: Bronson Journal
Recipient: Public

Date: 12-6-96

Title:(Community Input Sought on Superfund Site- Bronson Journal Article)
Type: Community-Public Participation
Category. P4-Newspaper Clippings/ Press Releases Public Notices
Author: Bronson Journal
Recipient: Public

Date: 12-6-96

Title:(Superfund Advisory Group Informational Meetinz Dec. 10- Bronson Journal Article)
Type: Community-Public Participation
Category: P4-Newspaper Clippings/ Press Releases 'Public Notices
Author: Bronson Journal
Recipient: Public

-------
Date: 11-29-96

Title:(Staie Seeks Feedback on Health Report-Bronson Journal)
Type: Communiiy-Public Participation
Category: P4-Newspaper Clippings/ Press Releases/Public Notices
Author: Bronson Journal
Recipient: -Public
Date: 11-21-96

Title:(EPA wants to form Community Advisory Group for North Bronson Superfund Site-Bronson
Journal)
Type: Community-Public Participation
Category: P4-Newspaper Clippings/ Press Releases/Public Notices
Author: Bronson Journal
Recipient: -Public

Date: 10-17-96

Title:(Public Health Assessment Done for North Bronson-Bronson Journal)
Type: Community-Public Participation
Category: P4-Newspaper Clippings/ Press Releases/Public Notices
Author: Bronson Journal
Recipient: -Public
Date: 9-16-96

Title:(Bronson officials present Superfund options to public-Bronson Journal)
Type: Community-Public Participation
Category:  P4-Newspaper Clippings/ Press Releases/Public Notices
Author: Bronson Journal-
Recipient: Public

Date: 8-1-96

Title:(Wetland could be constructed to clean contaminated groundwater in Bronson-Bronson Journal)
Type: Community-Public Participation
Category:  P4-Newspaper Clippings/ Press Releases/Public Notices
Author: Bronson Journal-
Recipient: Public

Date: 5-9-96

Title:(MDEQ Supervises clean-up of part of Old Douglas Property in Bronson-Bronson Journal)
Type: Community-Public Participation
Category:  P4-Newspaper Clippings/ Press Releases/Public Notices
Author: Bronson Journal
Recipient: -Public

-------
 Date:  11-9-95

 Title:(EPA Proposes $105,000 Fine Against Bronson Plating Co.)
 Type: Community-Public Participation
 Category: P4-Newspaper Clippings/ Press Releases/Public Notices
 Author: Bronson Journal
 Recipient: -Public
 Date: 7-13-95

 Title:(More Water Testing Set for Cleanup Site-Bronson Journal)
 Type: Community-Public Participation
 Category: P4-Newspaper Clippings/ Press Releases/Public Notices
 Author: Bronson Journal
 Recipient: -Public
Date:6-22-95

Title:(State Officials Explain EPA Superfund Clean-up Process To Bronson Residents-Bronson Journal)
Type: Community-Public Participation
Category: P4-Newspaper Clippings/ Press Releases/Public Notices
Author: Bronson Journal
Recipient: -Public

Date:6-15-95

Title:(Public Meeting Scheduled for Thursday to Update the Bronson Superfund Site-Bronson Journal)
Type: Community-Public Participation
Category: P4-Newspaper Clippings/ Press Releases/Public Notices
Author: Bronson Journal-
Recipient: Public

Date:6-5-95

Title:(North Bronson Superfund Site gets smaller-Daily Reporter, Coldwater)
Type: Community-Public Participation
Category: P4-Newspaper Clippings/ Press Releases/Public Notices
Author:  Bronson Journal
Recipient: -Public

Date: 6-1-95

Title:( Public Meeting Announcement)
Type: Community-Public Participation
Category: P4-Newspaper Clippings/ Press Releases/Public Notices
Author: MDNR-MDEQ
Recipient: Bronson Journal-Public

-------
 Date: 1-14-93

 Title:(City of Branson Named in Third Party Lawsuit Over Contamination clean-up by Kuhlman-Bronson
 Journal)
 Type: Community-Public Participation
 Category: P4-Newspaper Clippings/ Press Releases/Public Notices
 Author: Bronson Journal
 Recipient. -Public

 Date: 7-13-89

 Title:(PubIic Notice, North Bronson Industrial Area Remedial Investigation/ Feasibility Study (newspaper
 ad))
 Type: Community-Public Participation
 Category: P4-Newspaper Clippings/ Press Releases/Public Notices
 Author: MDNR-MDEQ
 Recipient: Bronson Journal-Public

 Dale: 9-17-88

 Thle:(EPA orders Tests of Bronson water-Sturgis Journal)
 Type: Community-Public Participation
 Category: P4-Newspaper Clippings/Press Releases/Public Notices
 Author: Srurgis Journal
 Recipient: Bronson -Public

 Date: 9-1-88

Title:(Toxic Waste Investigation to Begin Here Sept. 19-Bronson Journal)
Type: Community-Public Participation
Category: P4-Newspaper Clippings/ Press Releases/Public Notices
Author: Bronson Journal
Recipient: -Public
Date: 6-7-95

Title:(North Bronson Industrial Area Superfund Site Information Bulletin)
Type: Community-Public Participation
Category: P6-Newsletters/Factsheets
Author: MDNR-MDEQ
Recipient: Bronson Journal-Public

Date: 6-94

Title:(Methods for Measuring the Toxicity and Bioaccumulation of Sediment-Associated Contaminants
with Freshwater Invertebrates)
Type: Technical Sources and Guidance Documents
Category: Tl-EPA Headquarters and Regional Guidance
Author: EPA
Recipient:

-------
 Date: 2-97

 Title:(Interoflice Memoranda to Bill Harmon From Sandra Kosek, Surface water Quality Division re:
 North Bronson Superfund Site Theoretical WQBEL for Trichloroethylene)
 Type: Technical Sources and Guidance Documents
 Category: T2- State Guidance
 Author: SWQD
 Recipient: Bill Harmon, MDEQ

 Date: 2-96

 Title:(lnteroffice Memoranda to Bill Harmon From Sandra Kosek, Surface water Quality Division re:
 North Bronson Superfund Site Venting Groundwater Mixing Zone Review)
 Type: Technical Sources and Guidance Documents
 Category: T2- State Guidance
 Author: SWQD
 Recipient: Bill Harmon, MDEQ

 Date: 1-21-94

 Title:(lnteroffice Memoranda Re: Chemical Analysis of Sediment Samples Collected from Reference Sites
 in Michigan's Various Eco-regions)
 Type: Technical Sources and Guidance Documents
 Category: T2-State Guidance
 Author: Roger Jones, Great Lakes and Environmental Assessment Division
 Recipient: Water Quality Appraisal Unit Staff

 Date: 9-93

Title:(MDEQ Operational Memorandum 15, "Default Type A Clean-up Criteria")
Type: Technical Sources and Guidance Documents
Category: T2-State Guidance
Author: Alan J. Howard
Recipient: Environmental Response Division Staff

Date:

Title:(NOAA Technical Memorandum NOS OMA 52, "The Potential for Biological Effects of Sediment-
Sorbed  Contaminants tested in the National Status and Trends Program")
Type: Technical Sources and Guidance Documents
Category: T5-Technical Sources
Author: Edward Long and Lee Morgan
Recipient:

 Date: 1998

Title:(Private Well Survey)
Type: Technical Sources and Guidance Documents
Category: T5-Technical Sources
AuthorMDEQ
Recipient:

-------
Date: 1996

Title:(Treatment Wetlands)
Type: Technical Sources and Guidance Documents
Category: T5-Technical Sources
Author: Robert H. Kadlec
Recipient: Published Book
Date: 1989

Title:(Constructed Wetlands for Wastewater Treatment)
Type: Technical Sources and Guidance Documents
Category: T5-Technical Sources
Author: Donald A. Hammer
Recipient: Published Book
Date: 5-93

Title:(Guidelines for the Protection and Management of Aquatic Sediment Quality in Ontario)
Type: Technical Sources and Guidance Documents
Category: T5 Technical Sources
Author: D. Persaud, R. Jaagumagi and A. Hayton, Water Resources Branch, Ontario Ministry of the
Environment
Recipient:

-------