A REPORT AND EVALUATION OF POLLUTION ABATEMENT PROJECTS AND
OTHER ENVIRONMENTAL NEEDS AT FEDERAL INSTALLATIONS PROPOSED
BY EXECUTIVE AGENCIES IN RESPONSE TO EXECUTIVE ORDER 12088
 SEPTEMBER 1989                Register Copy No:
                                           For:

-------
                        TABLE OF CONTENTS

    EVALUATION OF POLLUTION ABATEMENT AND PREVENTION PROJECTS
                  PROPOSED FOR FISCAL YEAR 1991
I.     INTRODUCTION 	1-1

      Confidential Nature of Report Data	1-2


II.   ENVIRONMENTAL POLLUTION ABATEMENT NEEDS SUMMARY:

      Report Summary	II-l
      Summary of Projects and Cost by Agency
          for FY 1991 	II-3
      Total Number of Projects Requested by All Federal
          Agencies FY 1987-91	 II-4
      Total Project Dollars Requested by All Federal
          Agencies FY 1987-91	 II-5
      Projects by Federal Agency and
          Environmental Media	II-6
      Number of Requested Projects by Percent 	II-7
      Requested Project Dollars by Percent	II-8
      Environmental Impact of Requested Projects 	II-9
      Number and Dollar Amount of Projects by
          Compliance Class 	11-10
      Number of Requested Projects for All Agencies
          by Class	11-11
      Total Dollars Requested by All Agencies
          by Class 	11-12

III.   REGIONAL DISTRIBUTION OF PROPOSED ENVIRONMENTAL PROJECTS

      Regional Summary	III-l
      Number and Cost of Federal Agency Projects in
          Each EPA Region 	III-2
      Number of Projects in Each EPA Region
          by Compliance Class 	III-3
      Number of Projects in Each EPA Region
          by Environmental Media 	III-4

-------
IV.   EPA EVALUATION OF AGENCY PLANS

      Department of Agriculture	USDA-1
      Department of the Interior	DOI-1
      Department of Labor	DOL-l
      Department of Veterans Affairs	VA-l
      General Service Administration	GSA-l
      Tennessee Valley Authority	TVA-l
      Environmental Protection Agency	EPA-1
      Department of Transportation	DOT-1
      National Aeronautics & Space Administration...NASA-1
      Corps of Engineers, Civil	COE-1

      Department of Defense
         Department of the Navy.	NAVY-1
         Department of the Army	ARMY-l
         Department of Air the Force	USAF-l
         Defense Logistics Agency	DLA-1
V.    PENDING AGENCY RESPONSE	V-l

-------
                              TABLES
     1    Summary of Projects and Cost by Agency	II-3

     2    Projects by Federal Agency and Environmental
          Media	II-6

     3    Environmental Impact of Requested Projects	II-9

     4    Number and Dollar Amount of Projects
          by Compliance Class	11-10

     5    Number and Cost of Federal Agency Projects in
          Each EPA Region	III-2

     6    Number of Projects in Each EPA Region
          by Compliance Class	III-3

     7    Number of Projects in Each EPA Region
          by Environmental Media	III-4

USDA-1    Environmental Impact and Compliance Status of Number
          and Estimated Total Cost of Pollution Abatement
          Projects for Fiscal Year 1991	USDA-4

USDA-2    Number and Cost of Pollution Abatement Projects
          by Class and Compliance Status
          for Fiscal Year 1991	USDA-5

USDA-3    Number and Cost of Pollution Abatement Projects
          by Environmental Media for Fiscal Year 1991	USDA-6

DOI-1     Environmental Impact and Compliance Status of Number
          and Estimated Total Cost of Pollution Abatement
          Projects for Fiscal Year 1991	DOI-6

DOI-2     Number and Cost of Pollution Abatement Projects
          by Class and Compliance Status
          for Fiscal Year 1991	DOI-7

DOI-3     Number and Cost of Pollution Abatement Projects
          by Environmental Media for Fiscal Year 1991	DOI-8

-------
DOL-l     Environmental Impact and Compliance Status of Number
          and Estimated Total Cost of Pollution Abatement
          Projects for Fiscal Year 1991	DOL-4

BOL-2     Number and Cost of Pollution Abatement Projects
          by Class and Compliance Status
          for Fiscal Year 1991	DOL-5

DOL-3     Number and Cost of Pollution  Abatement Projects
          by Environmental Media for Fiscal  Year 1991	DOL-6

VA-1      Environmental Impact and Compliance  Status of  Number
          and Estimated Total  Cost of Pollution Abatement
          Projects for Fiscal  Year 1991		• • -VA-4

VA-2      Number and Cost of Pollution  Abatement Projects
          by Class and Compliance Status
          for Fiscal Year 1991.	VA-5

VA-3      Number and Cost of Pollution  Abatement Projects
          by Environmental Media for Fiscal  Year 1991..	VA-6

 GSA-1     Environmental  Impact and Compliance  Status  of  Number
           and  Estimated  Total  Cost of Pollution Abatement
           Projects  for Fiscal  Year 1991	GSA-6

 GSA-2     Number  and  Cost of Pollution  Abatement Projects
           by Class  and Compliance Status
           for  Fiscal  Year  1991	GSA-7

 GSA-3     Number  and  Cost of Pollution  Abatement Projects
           by Environmental Media for Fiscal  Year 1991	.GSA-8

 TVA-1     Environmental  Impact and Compliance  Status  of  Number
           and Estimated  Total  Cost of Pollution Abatement
           Projects  for  Fiscal  Year 1991	TVA-6

 TVA-2     Number  and  Cost of Pollution  Abatement Projects
           by Class  and  Compliance Status
           for  Fiscal  Year  1991...	TVA-7

 TVA-3     Number  and  Cost of Pollution  Abatement Projects
           by Environmental Media for Fiscal  Year 1991	TVA-8

 EPA-1     Environmental  Impact and Compliance  Status  of  Number
           and Estimated  Total  Cost of Pollution Abatement
           Projects  for  Fiscal  Year 1991	EPA-6

 EPA-2     Number  and  Cost of Pollution  Abatement Projects
           by Class  and  Compliance Status
           for  Fiscal  Year  1991	EPA-7

-------
EPA-3     Number and Cost of Pollution Abatement Projects
          by Environmental Media for Fiscal Year 1991	EPA-8
DOT-l     Environmental Impact and Compliance Status of Number
          and Estimated Total Cost of Pollution Abatement
          Projects for Fiscal Year 1991	DOT-6

DOT-2     Number and Cost of Pollution Abatement Projects
          by Class and Compliance Status
          for Fiscal Year 1991	DOT-7

DOT-3     Number and Cost of Pollution Abatement Projects
          by Environmental Media for Fiscal Year 1991	DOT-8

NASA-1    Environmental Impact and Compliance Status of Number
          and Estimated Total Cost of Pollution Abatement
          Projects for Fiscal Year 1991	NASA-6

NASA-2    Number and Cost of Pollution Abatement Projects
          by Class and Compliance Status
          for Fiscal Year 1991	NASA-1

NASA-3    Number and Cost of Pollution Abatement Projects
          by Environmental Media for Fiscal Year 1991	NASA-8

COE-1     Environmental Impact and Compliance Status of Number
          and Estimated Total Cost of Pollution Abatement
          Projects for Fiscal Year 1991	COE-6

COE-2     Number and Cost of Pollution Abatement Projects
          by Class and Compliance Status
          for Fiscal Year 1991	COE-7

COE-3     Number and Cost of Pollution Abatement Projects
          by Environmental Media for Fiscal Year 1991	COE-8

NAVY-1    Environmental Impact and Compliance Status of Number
          and Estimated Total Cost of Pollution Abatement
          Projects for Fiscal Year 1991	NAVY-6

NAVY-2    Number and Cost of Pollution Abatement Projects
          by Class and Compliance Status
          for Fiscal Year 1991	NAVY-7

NAVY-3    Number and Cost of Pollution Abatement Projects
          by Environmental Media for Fiscal Year 1991	NAVY-8

ARMY-1    Environmental Impact and Compliance Status of Number
          and Estimated Total Cost of Pollution Abatement
          Projects for Fiscal Year 1991	ARMY-7

ARMY-2    Number and Cost of Pollution Abatement Projects
          by Class and Compliance Status
          for Fiscal Year 1991	ARMY-8

-------
ARMY-3
Number and Cost of Pollution Abatement Projects
by Environmental Media for Fiscal Year 1991	ARMY-9
USAF-1    Environmental Impact and Compliance Status of Number
          and Estimated Total Cost of Pollution Abatement
          Projects for Fiscal Year 1991	USAF-7

USAF-2    Number and Cost of Pollution Abatement Projects
          by Class and Compliance Status
          for Fiscal Year 1991.	USAF-8

USAF-3    Number and Cost of Pollution Abatement Projects
          by Environmental Media for Fiscal Year 1991	USAF-9

DLA-1     Environmental Impact and Compliance Status of Number
          and Estimated Total Cost of Pollution Abatement
          Projects for Fiscal Year 1991.	DLA-6

DLA-2     Number and Cost of Pollution Abatement Projects
          by Class and Compliance Status
          for Fiscal Year 1991.	DLA-7

DLA-3     Number and Cost of Pollution Abatement Projects
          by Environmental Media for Fiscal Year 1991	DLA-8

-------
                             FIGURES
     1    Total Number of Projects Requested by
          All Federal Agencies FY 1987-91	II-4

     2    Total Dollars Requested by All Federal
          Aqencies FY 1987-91	II-5

     3    Total Number of Projects by Agency and
          Percentage	II-7

     4    Total Number of Dollars by Agency and
          Percentage	II-8

     5    Number of Projects for All Agencies
          by Class	11-11

     6    Number of Dollars for All Agencies
          by Class	11-12

USDA-1    Total Number and Dollars Requested
          by Bureau	USDA-2

USDA-2    Total Number and Dollars Proposed for
          FY 1991 by Class	USDA-3

 DOI-1    Total Number of Projects Proposed for
          FY 1987-91	DOI-2

 DOI-2    Total Dollars Requested for Pollution
          Abatement Projects for FY 1987-91	DOI-3

 DOI-3    Proposed Dollars and Number of Projects
          by Bureau for FY 1991	DOI-4

 DOI-4    Total Number and Dollars Proposed for
          FY 1991 by Compliance Class	DOI-5

 DOL-1    Total Number and Dollars Requested for
          Pollution Abatement Needs for FY  1991	DOL-2

 DOL-2    Total Number and Dollars Proposed for
          FY 1991 by Compliance Class	DOL-3

-------
 VA-1    Total Number and Dollars Requested for
         Pollution Abatement Needs for FY  1991	VA-2

 VA-2    Total Number and Dollars Proposed for
         FY 1991 by Compliance Class	VA-3

TVA-1    Total Number of Projects Proposed for
         FY 1987-91.	TVA-2

TVA-2    Total Dollars Requested for  Pollution
         Abatement Projects for FY 1987-91	TVA-3

TVA-3    Proposed Dollars and Number  of  Projects
         for FY 1991	TVA-4

TVA-4    Total Number and Dollars for FY 1991
         by Compliance Class.	• -TVA-5

GSA-1    Total Number of Projects Proposed for
         FY 1987-91.	GSA-2

GSA-2    Total Dollars Requested for  Pollution
         Abatement  Projects for FY 1987-91.	GSA-3

GSA-3    Proposed Dollars and Number  of  Projects
         for  FY  1991. .	GSA-4

 EPA-1    Total Number of Projects Proposed for
         FY  1987-91	EPA-2

 EPA-2    Total  Dollars Requested for  Pollution
         Abatement  Projects for FY 1987-91.	EPA-3

 EPA-3     Proposed  Dollars and Number  of  Projects
          for  FY  1991	EPA-4

 EPA-4    Total  Number and Dollars for FY 1991
         by  Compliance Class	EPA-5

 DOT-1    Total  Number of Projects Proposed for
         FY  1987-91	DOT-2

 DOT-2    Total  Dollars Requested for  Pollution
         Abatement  Projects for FY 1987-91	DOT-3

 DOT-3    Proposed  Dollars and Number  of  Projects
          for  FY  1991 by Bureau	DOT-4

 DOT-4    Total Number and Dollars for FY 1991
         by Compliance Class	DOT-5

-------
NASA-1    Total Number of Projects Proposed for
          FY 1987-91	NASA-2

NASA-2    Total Dollars Requested for Pollution
          Abatement Projects for FY 1987-91	NASA-3

NASA-3    Proposed Dollars and Number of Projects
          for FY 1991	NASA-4

NASA-4    Total Number and Dollars for FY 1991
          by Compliance Class	NASA-5

 COE-1    Total Number of Projects Proposed for
          FY 1987-91	COE-2

 COE-2    Total Dollars Requested for Pollution
          Abatement Projects for FY 1987-91	COE-3

 COE-3    Proposed Dollars and Number of Projects
          for FY 1991	COE-4

 COE-4    Total Number and Dollars for FY 1991
          by Compliance Class	COE-5

NAVY-1    Total Number of Projects Proposed for
          FY 1987-91	NAVY-2

NAVY-2    Total Dollars Requested for Pollution
          Abatement Projects for FY 1987-91	NAVY-3

NAVY-3    Proposed Dollars and Number of Projects
          for FY 1991	NAVY-4

NAVY-4    Total Number and Dollars for FY 1991
          by Compliance Class	NAVY-5

ARMY-1    Total Number of Projects Proposed for
          FY 1987-91	ARMY-2

ARMY-2    Total Dollars Requested for Pollution
          Abatement Projects for FY 1987-91	ARMY-3

ARMY-3    Proposed Dollars and Number of Projects
          for FY 1991 by Major Command	ARMY-4 , 5

ARMY-4    Total Number and Dollars for FY 1991
          by Compliance Class	ARMY-6

-------
USAF-1    Total Number of Projects Proposed for
          FY 1987-91	USAF-2

USAF-2    Total Dollars Requested for Pollution
          Abatement Projects for FY 1987-91	USAF-3

USAF-3    Proposed Dollars and Number of Projects
          for FY 1991 by Major Command	USAF-4,5

USAF-4    Total Number and Dollars for FY 1991
          by Compliance Class	USAF-6

 DLA-1    Total Number of Projects Proposed for
          FY 1987-91	 .DLA-2

 DLA-2    Total Dollars Requested for Pollution
          Abatement Projects for FY 1987-91	.DLA-3

 DLA-3    Proposed Dollars and Number of Projects
          for FY 1991	DLA-4

 DLA-4    Total Number and Dollars for FY 1991
          by Compliance Class	DLA-5

-------
I. INTRODUCTION

-------
                                                       1-1
         POLLUTION ABATEMENT NEEDS AT FEDERAL FACILITIES
            Evaluation  of  Pollution Abatement Projects
                  Proposed for  Fiscal Year  1991
INTRODUCTION

The Federal Government owns approximately 28,800 installations in
the United States comprising over 724 million acres.   In addition
to the federally owned acreage, the Government holds  52 million
acres in trust consisting principally of Indian reservations.
The Federal Government also owns 412,132 buildings containing  a
total of 2.7 billion square feet.  The size of these  buildings
ranges from 6.6 million square feet in the Pentagon to less than
100 square feet of storage, service, or general purpose space  in
buildings located throughout the country.  The Federal government
owns 32 percent of the total land area in the United  States.

The EPA Administrator has stated that Federal facility compliance
with pollution abatement regulations should be a model for the
rest of the regulated community and that they should  lead the  way
in minimizing any environmental contamination associated with  the
installations under their control.  To help achieve this goal the
Administrator issued a new Federal Facilities Compliance Strategy
in 1988 which established a comprehensive and proactive approach
to achieving environmental compliance at Federal facilities.
This strategy emphasizes the use of innovative compliance
management techniques, initiatives for improved compliance
tracking and more effective use of the Federal agency OMB A-106
environmental needs planning process.

Executive Order 12088, makes the head of each executive agency
responsible for ensuring that all necessary actions are taken for
the prevention, control and abatement of environmental pollution
with respect to all facilities and activities under control of
the agency.  Additionally, the head of each Federal agency is
directed to submit an annual plan to the Director of the Office
of Management and Budget (OMB) for funding the projects which are
needed for their facilities to meet all applicable environmental
standards.  In accordance with OMB Circular A-106, the plans are
first submitted to the Administrator of the Environmental
Protection Agency (EPA) for review and evaluation.  On the basis
of this evaluation, EPA identifies those projects listed in the
plans which it believes should receive priority consideration for
inclusion in the President's annual budget.

-------
                                                       1-2

This report contains the EPA's evaluation of environmental
projects proposed for funding in fiscal year 1991.   For each
project reported, the relative seriousness of the pollution
problem to be corrected is indicated.   The current status of the
facility with regard to its compliance with the applicable
environmental standard is specified and the severity of the
impact of the pollutant on the immediate environment is defined.

The EPA's evaluations are used as a guide by the OMB in assessing
the Federal Agencies' fiscal year 1991 budget.   Agencies which
have projects included in the report should, therefore, compare
the evaluations with their own priorities.  Any disagreement with
an evaluation should be brought to the attention of the EPA and
the differences resolved.
RELATIONSHIP TO AGENCY BUDGET ESTIMATES

OMB Circular No. A-ll provides detailed instructions and guidance
on the preparation and submission of the annual budget by all
Federal agencies.  The 1988 revision of the Circular indicates in
Section 12.4(g) that "Estimates for design and construction of
Federal facilities or remedial environmental projects will be
submitted only after consultation with the Environmental
Protection Agency (EPA) on OMB Circular No. A-106 plans."

CONFIDENTIAL NATURE OF REPORT DATA

Holders of copies of this report are advised that it is subject
to OMB Circular A-10, which governs the handling of information
relating to the budget estimates of Federal agencies.  Within the
meaning of the Circular, this report is in support of budget
estimates submitted to the OMB by agencies whose installations
are listed.  Circular A-10 states that the "confidential nature
of agency submissions, requests, recommendations, supporting
materials and similar communications should be maintained, since
these documents are an integral part of the decisionmaking
process by which the President resolves budget issues and
develops recommendations to the Congress.   Presidential budget
decisions are not final until the budget itself is transmitted to
Congress.  Amendments to the budget and supplemental
appropriation requests may also follow the transmittal of the
budget.  Budgetary material should not be disclosed in any form
prior to transmittal by the President of the material to which it
pertains.  The head of each agency is responsible for preventing
premature disclosures of this budgetary information."

Names of all holders of this report are registered in the
Headquarters of EPA. Release of this report, in whole or in part
to persons of organizations other than the holder name in the
title page of each copy is forbidden without prior approval of
the OMB.

-------
II. SUMMARY

-------
                                                       II-l

                        REPORT SUMMARY
Fourteen departments and agencies of the Executive Branch have
proposed 3280 projects at an estimated cost of approximately $1.2
billion for pollution abatement at Federal facilities for funding
in fiscal year 1991. These figures include 355 projects costing
$102 million for air pollution abatement and 578 projects costing
$242 million to abate water pollution.  There are 955 projects
costing $265 million for solid waste and RCRA; and 550 projects,
costing $499 million for CERCLA. There are 224 projects costing
$53 million for the abatement of toxic substances and pesticides.
There are 385 projects costing $17 million for drinking water,
noise and radiation.  The remaining 233 projects costing $56
million are categorized as multi-media.

The Department of Energy (DOE) is not represented in this report.
A supplemental report dealing only with the DOE will be issued at
a later date.  The Secretary of Energy recently issued a five-
year plan detailing the steps DOE planned to take in dealing with
a significant number of environmental cleanup problems.  EPA
reviewed a preliminary version of this plan and reguested that
all projects identified in the five-year plan be reflected in the
agency A-106 plan.  DOE agreed to crosswalk the projects as
reguested and to also provide a limited crosswalk between the A-
106 projects and the DOE budget line items.  This effort will be
completed within a short period and the new DOE plan will be
available for review and evaluation.

EPA has evaluated the 3280 projects in the FY 1991 report and
categorized them according to the impact on the local environment
that would result if the projects were not funded in fiscal year
1991.  EPA rated 1446 projects (budgeted at $808 million) as
having "High" environmental impact.  "Medium" ratings were
assigned to 1545 projects ($348 million) and the remaining 289
projects ($77 million) were rated "Low."

EPA classifies each project in the Federal agency pollution
abatement plans according to a rather straightforward hierarchy
related to the urgency of compliance.  Projects are grouped into
three distinct classes.  Projects grouped together under what is
defined as "Class I" are those that are already out of compliance
in some manner and EPA considers funding of these projects of the
highest priority.  The second grouping, defined as "Class II,"
contains all those projects that must be included in the current
fiscal year planning cycle of a Federal agency to enable it to
meet a compliance deadline in the immediate future.  If projects
in this class are not programmed for funding during the current
budget cycle they will be out of compliance before they can be
funded in the next cycle.

-------
                                                       II-2
The third grouping, defined as "Class III," group together all
other projects that the individual Federal agencies feel are
needed and important to accomplish but are not related to a
compliance issue.  The "Class III" grouping contains a number of
environmentally important categories, such as waste minimization
and pollution prevention.  Also important are those projects
reflecting a Federal agency commitment to strong future-oriented
planning: such as environmental audits, assessments, impact
analysis, monitoring and a variety of National Environmental
Policy Act (NEPA) activities.

Using this type of compliance class grouping, all projects were
evaluated relative to the current status of their compliance with
environmental standards.  There were 1082 Class I projects  ($498
million) at facilities that had either a signed compliance
agreement (CMPA); a notice of violation (INOV); or were violating
an established standard where the compliance deadline had passed
(ESDP).

There were 1377 Class II projects ($511 million) at facilities
that did not meet an established standard, but where the
compliance deadline was in the future  (ESDF); or did not meet a
pending standard with a compliance date in the future (PSDF).

The remaining 818 Class III projects ($223 million) fell into the
category of meeting an established standard, but needing to be
replaced because of obsolescence  (ESRD); meeting an established
standard but needing replacement due to the need for expansion
(ESRE); meeting an established standard but needing to
demonstrate leadership  (ESDL); or meeting an established standard
but the project was needed for other reasons  (OTHER).

For fiscal year 1991, the following Federal departments did not
report any proposed funding for pollution abatement projects to
be included in the OMB A-106  report as required by Section  1-401
of Executive Order 12088:

     Commerce                              Justice
     Health & Human Services               Education
     Housing & Urban Development
     Treasury

-------
                                                                                    II-3
         TABLE 1:   NUMBER AND ESTIMATED COST OF POLLUTION ABATEMENT
                    PROJECTS PROPOSED BY FEDERAL AGENCIES FOR
                    FISCAL YEAR 1991 FLINGING  *
                                             NUMBER OF    BUDGETED AMOUNT
                   AGENCY                    PROJECTS      (IN THOUSANDS)
DEPARTMENT OF AGRICULTURE                        769            61,776.4

DEPARTMENT OF INTERIOR                             8            23,313.0

DEPARTMENT OF LABOR                              176            11,397.6

DEPARTMENT OF VETERANS AFFAIRS                   203            55,865.3

GENERAL SERVICES ADMINISTRATION                    1                75.0

TENNESSEE VALLEY AUTHORITY                         7             5,704.0

ENVIRONMENTAL PROTECTION AGENCY                   10             2,625.0

DEPARTMENT OF TRANSPORTATION                     IT*            68,644.8

NATIONAL AERONAUTICS & SPACE ADMINISTRATION       49            25,265.4

CORPS OF ENGINEERS (CIVIL WORKS)                  16               333.0

DEPARTMENT OF DEFENSE                           1867           978,798.2
     DEPARTMENT OF NAVY                          199           126,718.0

     DEPARTMENT OF ARMY                         1273           582,413.0

     DEPARTMENT OF AIR FORCE                     362           243,275.1

     DEFENSE LOGISTICS AGENCY                     33            26,392.1
GRAND TOTAL                                     3280         1,233,797.7


* DOES NOT INCLUDE DEPARTMENT OF ENERGY

-------
                        TOTAL NUMBER OF POLLUTION ABATEMENT
                         PROJECTS PROPOSED FOR FY 1987 - 91
                             FOR ALL FEDERAL AGENCIES
        4000
        3000-
  o
  UJ
  o
  cc
  Q.
2000-
        1000-
                  FY87
                        FY88
                                              FY89
FY90
FY91*
                                          RSCAL YEARS
FIG1
                                                                 •DOES NOT INCLUDE DOE

-------
                        TOTAL DOLLARS REQUESTED FOR POLLUTION

                          ABATEMENT PROJECTS FOR FY 1987 - 91

                              FOR ALL FEDERAL AGENCIES
     2000000
o
o
o
V)
cc
o
o
     1000000-
                 FY87
FY88
FY89
FY90
FY91
FIG 2
                                            FISCAL YEARS
                                                                      •DOES NOT INCLUDE DOE

-------
                                                                                                    II-6
TABLE 2: NUMBER AND ESTIMATED COST OF POLLUTION ABATEMENT PROJECTS
         BY ENVIRONMENTAL MEDIA PROPOSED FOR FISCAL YEAR 1991

                       FOR ALL FEDERAL AGENCIES
AGENCY AIR
PROJECTS
COST
($1,000)
COE 0
0.0
DOI 0
0.0
DOL 26
953.1
DOT 6
2029.0
EPA 0
0.0
6SA 0
0.0
NASA 7
3666.9
TVA 1
4642.0
USDA 1 1
2823.6
VA 137
44399.3
ARMY 127
30431.0
DLA 1
500.0
NAVY 3
145.0
USAF 36
12184.6
TOTAL 355
101774.7
DRINKING
MATER
PROJECTS
COST
($1,000)
0
0.0
0
0.0
0
0.0
3
650.0
0
0.0
0
0.0
1
50.0
0
0.0
305
6562.6
2
234.0
22
4789.0
1
150.0
1
88.0
9
1148.2
344
13671.8
NOISE
PROJECTS
COST
($1,000)
0
0.0
0
0.0
0
0.0
0
0.0
0
0.0
0
0.0
1
30.0
0
0.0
0
0.0
1
35.0
11
1377.0
0
0.0
0
0.0
0
0.0
13
1442.0
PESTICIDES RADIATION CERCLA
PROJECTS
COST
($1,000)
0
0.0
0
0.0
0
0.0
0
0.0
0
0.0
0
0.0
1
60.0
0
0.0
16
434.0
0
0.0
3
448.0
0
0.0
2
243.0
0
0.0
22
1185.0
PROJECTS PROJECTS
COST COST
($1,000) ($1,000)
0
0.0
0
0.0
0
0.0
0
0.0
1
60.0
0
0.0
0
0.0
0
0.0
6
8.3
0
0.0
21
2052.0
0
0.0
0
0.0
0
0.0
28
2120.3
0
0.0
1
6800.0
0
0.0
44
16930.0
0
0.0
0
0.0
6
4660.0
0
0.0
54
17825.0
0
0.0
183
220561.0
3
4000.0
120
77002.0
139
151374.1
550
499152.1
RCRA
PROJECTS
COST
($1,000)
14
141.0
2
7950 . 0
28
1712.0
81
24045.8
6
1630.0
1
75.0
20
9216.0
4
750.0
117
8025.9
6
783.0
529
158127.0
25
20740.1
32
6301.0
90
25519.2
955
265016.0
TSCA
HATER
MULTI
PROJECTS PROJECTS PROJECTS
COST COST COST
($1,000) ($1,000) ($1,000)
0
0.0
1
10.0
3
168.8
23
6648.0
0
0.0
0
0.0
2
620.0
0
0.0
43
2410.0
18
3175.9
88
28224.0
1
500.0
7
4128.0
16
6137.5
202
52022.2
2
192.0
4
8553.0
7
457.1
17
18342.0
3
935.0
0
0.0
10
6914.5
2
312.0
217
23687.0
39
7238.1
170
89147.0
1
2.0
34
38811.0
72
46911.3
578
241502.0
0
0.0
0
0.0
112
8106.6
0
0.0
0
0.0
0
0.0
1
48.0
0
0.0
0
0.0
0
0.0
119
47257.0
1
500.0
0
0.0
0
0.0
233
55911.6 1,
TOTAL
PROJECTS
COST
($1,000)
16
333.0
8
23,313.0
176
11,397.6
174
68,644.8
10
2,625.0
1
75.0
49
25,265.4
7
5,704.0
769
61,776.4
203
55,865.3
1273
582,413.0
33
26,392.1
199
126,718.0
362
243,275.1
3280
233,797.7

-------
    38.81%
     ARMY
                                                  USDA

                                                   23.45%
                                               TOTAL NUMBER OF POLLUTION ABATEMENT
                                              PROJECTS PROPOSED BY FEDERAL AGENCIES*
                                                      FOR FY 1991 (PERCENT)
                                                       DOT
                                                     5.30%
                                                1.49%
                                                NASA
FIG 3
0.49%

OCE
                                         6.07%
                                           NAVY
* DOES NOT INCLUDE DOE
** GSA, TVA, EPA, DOI

-------
         USAF

           19.72%
  DLA

  2.14%
FIG 4
                                               TOTAL DOLLARS REQUESTED FOR POLLUTION
                                               ABATEMENT PROJECTS PROPOSED BY FEDERAL
                                                  AGENCIES* FOR FY 1991 (PERCENT)
                      ARMY  47.20%
* DOES NOT INCLUDE DOE
" GSA, TVA, EPA, DOI

-------
            TABLE 3: EPA EVALUATION OF THE ENVIRONMENTAL IMPACT OF PROPOSED
                     POLLUTION ABATEMENT PROJECTS FOR FEDERAL INSTALLATIONS
                     FOR FISCAL YEAR 1991

                                    FOR ALL FEDERAL AGENCIES
                                                                                              II-9
AGENCY
                                      HIGH
                                                      MEDIUM
                                                                        LOW
TOTAL

DEPARTMENT OF AGRICULTURE
DEPARTMENT OF INTERIOR
DEPARTMENT OF LABOR
DEPARTMENT OF NAVY
DEPARTMENT OF ARMY
DEPARTMENT OF VETERANS AFFAIRS
GENERAL SERVICES ADMINISTRATION
DEPARTMENT OF AIR FORCE
TENNESSEE VALLEY AUTHORITY
ENVIRONMENTAL PROTECTION AGENCY
DEPARTMENT OF TRANSPORTATION
NATIONAL AERONAUTICS & SPACE ADMINISTRATION
CORPS OF ENGINEERS (CIVIL HORKS)
DEFENSE LOGISTICS AGENCY
GRAND TOTAL
PROJECTS
COST
($1,000)
411
41,153.0
5
21,510.0
37
5,140.4
146
108,752.0
578
385,780.0
1
57.0
0
0.0
180
176,022.9
7
5,704.0
8
2,520.0
31
27,702.2
25
17,464.0
0
0.0
17
16,308.7
1446
808,114.2
PROJECTS
COST
($1,000)
311
18,644.2
3
1,803.0
107
5,249.1
51
17,859.0
535
139,577.0
200
55,268.3
1
75.0
145
52,453.3
0
0.0
2
105.0
137
40,740.8
21
6,212.4
16
333.0
16
10,083.4
1545
348,403.5
PROJECTS
COST
($1,000)
47
1,979.2
0
0.0
32
1,008.1
2
107.0
160
57,056.0
2
540.0
0
0.0
37
14,798.9
0
0.0
0
0.0
6
201.8
3
1,589.0
0
0.0
0
0.0
289
77,280.0
PROJECTS
COST
($1,000)
769
61,776.4
8
23,313.0
176
11,397.6
199
126,718.0
1273
582,413.0
203
55,865.3
1
75.0
362
243,275.1
7
5,704.0
10
2,625.0
174
68,644.8
49
25,265.4
16
333.0
33
26,392.1
3280
1,233,797.7

-------
                     TABLE ft:  NUMBER AND ESTIMATED COST OF POLLUTION ABATEMENT PROJECTS FOR FEDERAL
                               INSTALLATIONS PROPOSED FOR FISCAL YEAR 1991 FUNDING, BY COMPLIANCE STATUS *

                                                        FOR ALL FEDERAL AGENCIES
                                                                                                                              11-10
AGENCY

COE
DOI
DDL
DOT
EPA
6SA
NASA
TVA
USDA
VA
ARMY
DLA
NAVY
USAF
TOTAL
CLASS
CMPA
PROJECTS
COST
($1,000)
0
0.0
I
6,800.0
0
0.0
1
150.0
0
0.0
0
0.0
1
400.0
0
0.0
3
34.5
0
0.0
135
223,962.0
0
0.0
0
0.0
15
25,625.0
156
256,971.5
I
INOV
PROJECTS
COST
($1,000)
0
0.0
1
3,200.0
1
8.7
3
1,257.0
0
0.0
0
0.0
1
2,200.0
4
750.0
35
6,875.0
0
0.0
24
17,417.0
0
0.0
0
0.0
3
3,077.9
72
34,785.6
ESDP
PROJECTS
COST
($1,000)
1
100.0
0
0.0
4
188.8
16
6,612.0
5
1,800.0
	
1
75.0
6
2,895.0
2
312.0
369
34,956.7
1
57.0
335
97,775.0
7
5,449.?
58
33,143.0
51
24,097.9
856
207,461.6
CLASS
ESDF
PROJECTS
COST
($1,000)
14
141.0
2
4,010.0
17
677.3
125
39,100.8
4
200.0
0
0.0
16
9,319.0
	
0
0.0
137
6,170.2
	 	
139
39,630.7
406
100,922.0
18
14,242.9
129
83,945.0
120
127,593.3
1127
425,952.2
II
PSDF
PROJECTS
COST
($1,000)
0
0.0
0
0.0
6
77.7
9
16,551.0
1
625.0
	 	
0
0.0
6
518.4
	 	
1
4,642.0
88
5,555.6
	
1
76.0
101
34,757.0
2
1,250.0
5
2,594.0
31
19,378.3
251
86,025.0
ESRO
PROJECTS
COST
($1,000)
1
92.0
1
793.0
33
4,053.7
8
665.4
0
0.0
0
0.0
	 	
3
2,175.0
0
0.0
82
4,914.4
1
87.0
	
56
16,140.0
	 	 	 	 .
0
0.0
5
5,736.0
23
5,399.1
213
40,055.6
CLASS III
ESRE
PROJECTS
COST
($1,000)
0
0.0
1
1,000.0
0
0.0
2
500.0
0
0.0
0
0.0
1
360.0
0
0.0
3
17.0
0
0.0
21
1,100.0
0
0.0
0
0.0
2
20.0
30
2,997.0
ESDL
PROJECTS
COST
($1,000)
0
0.0
0
0.0
5
134.1
0
0.0
0
0.0
0
0.0
2
39.0
0
0.0
3
107.0
0
0.0
99
20,433.0
0
0.0
1
1,200.0
39
11,454.8
149
33,367.9
OTHR
PROJECTS
COST
($1,000)
0
0.0
2
7,510.0
110
6,257.3
10
3,808.6
0
0.0
0
0.0
13
7,359.0
	
0
0.0
	
49
3,146.0
61
16,014.6
96
69,907.0
6
5,450.0
1
100.0
78
26,628.8
426
146,181.3
TOTAL
PROJECTS
COST
($1,000)
16
333.0
8
23,313.0
176
11,397.6
174
68,644.8
	
10
2,625.0
1
75.0
49
25,265.4
7
5,704.0
769
61,776.4
203
55,865.3
1273
582,413.0
33
26,392.1
199
126,718.0
362
243,275.1
3280
1,233,797.7
* SEE SECTION III FOR DEFINITIONS  OF  COMPLIANCE STATUS CATEGORIES

-------
                                            NUMBER OF POLLUTION ABATEMENT PROJECTS
                                                 PROPOSED BY FEDERAL AGENCIES*
                                                FOR FY 1991 BY COMPLIANCE CLASS
    CLASS III
     818 PROJECTS
     24.96%
                                                       CLASS I
                                                        1084 PROJECTS
                                                        33.05%
     CLASS II .
      1378 PROJECTS
      42.01%
                                                                *DOES NOT INCLUDE DOE
FIGS

-------
                                              TOTAL DOLLARS FOR POLLUTION ABATEMENT
                                              PROJECTS PROPOSED BY FEDERAL AGENCIES
                                                 FOR FY 1991 BY COMPLIANCE CLASS
   CLASS III
    $222601.8
    18.04%
                                                         CLASS I
                                                         $499218.7
                                                         40.46%
      CLASS II
       $511977.2
       41.50%
                                                                "DOES NOT INCLUDE DOE
FIG 6

-------
III. REGIONAL

-------
                                                       III-l
                        REGIONAL SUMMARY

The distribution of environmental activity by the Federal
agencies across the United States can be viewed in a number of
ways.  In terms of total number or density, there are presently
2,531 Federal installations that have active environmental
projects totalling approximately $9.2 billion. This total
includes all active projects presently in the A-106 system
through FY 1991, and is not confined to the current fiscal year.

To examine the FY 1991 density of planned Federal agency
environmental activity across the country, the United States was
segmented into three broad geographic areas.  For this analysis,
the East Coast was represented by EPA Regions 1 through 4, the
Midwest by EPA Regions 5 through 8, and the West Coast by EPA
Regions 9 and 10. In this grouping, the East Coast has a total of
1,106 projects, or 33.7 percent of the total, costing $446
million.  The Midwest has 1,172 projects, or 35.7 percent of the
total, costing approximately $411 million.  The West Coast has
975 projects, or 29.8 percent of the total, costing about $347
million.  The remaining 27 projects, costing about $30 million
are centrally managed.

Viewing projects across compliance classes indicates a roughly
even distribution across the three geographic areas. Along the
East Coast there are 340 Class I projects, in Federal agency
plans for current compliance reasons, which account for 31.6
percent of the total. The Midwest has 374, or 34.7 percent and
the West Coast 362, or 33.7 percent.  The Class II projects,
which allow agencies to meet near-term compliance deadlines,
demonstrate a similar pattern. The East Coast has 37 percent of
the total, the Midwest has 33 percent and the West Coast has 30
percent.  The Class III projects, those in the plans for other
environmental reasons, show the East Coast contributing 32
percent of the total, with the Midwest having a somewhat larger
portion, of 44 percent and the West Coast 24 percent.

Projects are distributed across the environmental media programs
in the following pattern: 355 air projects, with the East Coast
having 42 percent of the total, the Midwest 41 percent and the
West Coast 17 percent. With 922 water and drinking water
projects, the East Coast has 28 percent of the total, and the
Midwest and West Coast have 42 and 30 percent respectively. Of
the 955 RCRA projects, the East Coast has 41 percent, while the
Midwest and West Coast have 38 and 22 percent.  The East Coast
has 28 percent of the 550 CERCLA projects, with the Midwest
having 22 percent and the West Coast a fairly high concentration
of 50 percent.  The 265 toxics, pesticides, noise and radiation
projects are distributed evenly among the areas, with the East
Coast, Midwest and West Coast having 34, 31 and 36 percent
respectively. Multi-media or centrally managed projects account
for the remaining total of 259 projects.

-------
                                          TABLE  5:     NUMBER  AND  ESTIMATED  COST OF  POLLUTION
                                                      ABATEMENT PROJECTS BY EPA REGION  FOR
                                                      FISCAL  YEAR 1991
                                                                                                                                                       III-2
                                                            FOR  ALL FEDERAL  AGENCIES
         USDA
                   DOI
                              DDL
                                        NAVY
                                                  ARMY
                                                            VA
                                                                     GSA
                                                                                USAF
                                                                                          TVA
                                                                                                     DOT
                                                                                                               NASA
                                                                                                                         COE
                                                                                                                                   DLA
                                                                                                                                              EPA
                                                                                                                                                       TOTAL
EPA
REGION
CENT
MGD
01
02
03
04
05
06
07
08
09
10
PROJECTS
DOLLARS
($1,000)
8
698.0
13
99.5
6
80.0
59
13800.7
48
1347.1
60
6387.6
105
5091.9
5
169.8
145
4558.2
171
7563.2
149
21980.4
PROJECTS
DOLLARS
($1,000)
0
0.0
0
0.0
0
0.0
0
0.0
0
0.0
1
6800.0
0
0.0
0
0.0
3
10760.0
1
3950.0
3
1803.0
PROJECTS
DOLLARS
($1,000)
0
0.0
10
1204.0
16
479.2
20
983.3
30
1286.1
12
390.6
22
684.4
9
520.2
9
506.9
35
4086.7
13
1256.2
PROJECTS
DOLLARS
($1,000)
8
21967.0
17
4996.0
7
2834.0
49
23934.0
31
22752.0
6
993.0
9
822.0
1
100.0
0
0.0
55
38469.0
16
9851.0
PROJECTS
DOLLARS
($1,000)
0
0.0
60
12815.0
78
103557.0
230
99245.0
169
32252.0
120
30500.0
160
40982.0
47
44298.0
133
110656.0
188
80522.0
88
27586.0
PROJECTS
DOLLARS
($1,000)
0
0.0
17
5553.6
31
15025.0
21
2386.7
23
5946.7
54
14371.6
7
2193.0
17
4964.0
10
1916.2
14
2102.5
9
1406.0
PROJECTS
DOLLARS
($1,000)
0
0.0
0
0.0
0
0.0
0
0.0
0
0.0
0
0.0
1
75.0
0
0.0
0
0.0
0
0.0
0
0.0
PROJECTS
DOLLARS
($1,000)
0
0.0
13
10308.7
7
18685.0
10
5991.0
51
16644.8
40
23860.7
50
24405.6
8
3336 . 0
48
40687.6
109
71530.6
26
27825.0
PROJECTS
DOLLARS
($1,000)
0
0.0
0
0.0
0
0.0
0
0.0
7
5704.0
0
0.0
0
0.0
0
0.0
0
0.0
0
0.0
0
0.0
PROJECTS
DOLLARS
($1,000)
0
0.0
7
963.3
9
9893.3
13
3816.8
14
3745.2
15
3208.1
14
4978.9
6
1327.5
18
4804.2
12
4811.4
66
31096.1
PROJECTS
DOLLARS
($1,000)
5
2930.0
0
0.0
0
0.0
3
2300.0
6
5650.0
4
177.0
18
9114.4
0
0.0
0
0.0
13
5094.0
0
0.0
PROJECTS
DOLLARS
($1,000)
0
0.0
0
0.0
0
0.0
15
233.0
0
0.0
0
0.0
1
100.0
0
0.0
0
0.0
0
0.0
0
0.0
PROJECTS
DOLLARS
($1,000)
5
3500.0
2
2384.3
0
0.0
7
7350.0
1
710.0
6
3615.2
1
135.0
1
208.2
4
2319.2
4
5335.2
2
835.0
PROJECTS
DOLLARS
($1,000)
1
860.0
1
50.0
1
35.0
0
0.0
4
865.0
2
775.0
0
0.0
0
0.0
0
0.0
1
40.0
0
0.0
PROJECTS
DOLLARS
($1,000)
27
29,955.0
140
38,374.4
155
150,588.5
427
160,040.5
384
96,902.9
320
91,078.8
388
88,582.2
94
54,923.7
370
176,208.4
603
223,504.6
372
123,638.7
T°TAL 61,77^.4 23.313-.0    11,3^7.6   126,Ht.O 582^3.0   55,121.3     75.0    2«,8f.l   S,70?.0   68.&.S   25,2^1.4    333.0  26,3^.1  2,625.0  1,233^7.7

-------
                      TABLE 6:   NUMBER AND ESTIMATED  COST  OF  POLLUTION ABATEMENT PROJECTS PROPOSED FOR FEDERAL
                                INSTALLATIONS * BY  EPA  REGION FOR FISCAL YEAR  1991 FUNDING, BY COMPLIANCE STATUS. **
                                                                                                                              III-3


CENTRALLY
MANAGED
REGION 01
REGION 02
REGION 03
REGION 04
REGION 05
REGION 06
REGION 07
REGION 08
REGION 09
REGION 10
TOTAL
CMPA
PROJECTS
COST
($1,000)
0
0.0
2
650.0
5
75,300.0
34
18,308.0
18
4,501.0
5
20,173.0
8
7,834.0
0
0.0
24
84,217.5
54
40,748.0
6
5,240.0
156
256,971.5
CLASS I
INOV
PROJECTS
COST
($1,000)
0
0.0
2
70.0
I
150.0
16
8,720.0
16
3,634.5
3
270.0
13
4,364.2
1
13.0
2
3,457.0
15
11,339.9
3
2,767.0
72
34,785.6
ESDP
PROJECTS
COST
($1,000)
8
15,373.0
32
7,163.0
1
500.0
119
35,500.7
94
21,827.8
48
18,199.6
120
19,759.9
. 	 	
14
6,758.0
	
136
16,435.0
	
164
29,802.9
120
36,141.7
856
207,461.6
t CLASS
1 ESDF
PROJECTS
COST
($1,000)
7
8,999.0
62
24,979.4
38
19,252.5
146
49,196.9
148
41,985.8
133
32,347.3
121
30,918.8
44
9,779.1
79
46,684.9
203
101,789.4
	 .
146
60,019.1
1127
425,952.2
II
PSDF
PROJECTS
COST
($1,000)
5
1,263.0
	 	
9
1,265.0
„ 	
63
36,573.7
	 	
30
10,900.0
	
10
9,765.0
24
4,298.0
	 . 	
23
3,825.2
	 	
4
1 , 336 . 0
	 	
16
2,293.0
	
22
4,816.4
	
45
9,689.7
251
86,025.0
ESRO
PROJECTS
COST
($1,000)
0
0.0
12
1,238.0
7
2,499.0
15
6,520.5
9
1,475.0
21
2,727.9
30
8,427.0
8
1,884.0
23
119.0
73
13,158.2
15
2,007.0
213
40,055.6
CLASS III
ESRE
PROJECTS
COST
($1,000)
0
0.0
3
250.0
1
250.0
2
450.0
2
120.0
4
44.0
1
50.0
1
77.0
7
176.0
4
367.0
5
1,213.0
30
2,997.0
ESDL
PROJECTS
COST
($1,000)
1
1,260.0
7
355.4
5
3,617.5
25
5,505.0
24
5,404.6
12
2,893.7
21
4,862.2
3
194.0
21
2,588.0
24
6,150.5
6
597.0
149
33,367.9
OTHR
	
PROJECTS
COST
($1,000)
	
6
3,120.0
11
2,403.6
. 	 	
34
12,445.8
	 	
40
24,939.4
	
63
8,189.2
70
10,125.3
	 	
51
8,540.9
	 	
19
34,882.6
62
20,238.0
44
15,332.3
26
5,964.2
426
146,181.3
TOTAL
PROJECTS
COST
($1,000)
27
29,955.0
140
38,374.4
155
150,588.5
427
160,040.5
384
96,902.9
320
91,078.8
388
88,582.2
94
54,923.7
370
176,208.4
603
223,504.6
372
123,638.7
3280
1,233,797.7
 * DOES NOT INCLUDE DEPARTMENT OF ENERGY

*» SEE SECTION III FOR DEFINITIONS OF COMPLIANCE STATUS CATEGORIES

-------
TABLE 7:   NUMBER AND ESTIMATED COST OF POLLUTION ABATEMENT PROJECTS
           PROPOSED BY FEDERAL AGENCIES FOR FISCAL YEAR 1991 FOR EACH
           EPA REGION BY ENVIRONMENTAL MEDIA
                                                                                           III-4
REGION

CENTRALLY
MANAGED
01
OZ
03
04
05
06
07
08
09
10
TOTAL
AIR
PROJECTS
COST
($1,000)
^
525.0
18
5318.6
29
20362.0
60
11059.3
39
11330.8
42
17189.2
51
17794.4
19
5054.0
33
4918.0
39
6569.4
21
1654.0
355
101774.7
DRINKING
WATER
PROJECTS
COST
($1,000)
0
0.0
1
550.0
6
248.0
25
3081.0
16
375.8
18
1056.0
56
979.3
2
120.0
79
2028.5
59
2521.8
82
2711.4
344
13671.8
NOISE
PROJECTS
COST
($1,000)
0
0.0
0
0.0
2
85.0
3
1201.0
1
10.0
1
30.0
1
80.0
0
0.0
3
34.0
2
2.0
0
0.0
13
1442.0
PESTICIDE
PROJECTS
COST
($1,000)
0
0.0
1
165.0
0
0.0
1
122.0
2
296.0
0
0.0
3
30.0
1
40.0
5
289.0
4
124.0
5
119.0
22
1185.0
S RADIATIOf
PROJECTS
COST
($1,000)
0
0.0
0
0.0
0
0.0
16
1614.0
1
60.0
1
7.0
2
201.0
0
0.0
1
150.0
7
88.3
0
0.0
28
2120.3
4 CERCLA
PROJECTS
COST
($1,000)
1
450.0
19
15268.1
24
34482 . 0
56
48648.0
55
25520.0
26
31101.0
39
17777.0
14
8819.0
39
116925.0
184
146534.0
93
53628.0
550
499152.1
RCRA
PROJECTS
COST
($1,000)
4
2850.0
53
11100.9
45
11469.5
182
71548.1
109
25819.7
124
19561.1
120
35021.9
23
3649.9
90
30717.3
138
39801.5
67
13476.1
955
265016.0
TSCA
PROJECTS
COST
($1,000)
4
1123.0
14
2433.0
11
4643.0
11
2854.7
25
6947.0
29
4276.6
13
3651.7
3
615.6
17
5474.0
39
9338.6
36
10665.0
202
52022.2
MATER
PROJECTS
COST
($1,000)
13
24507.0
29
3163.8
35
79267.5
57
17595.0
84
22016.5
58
17141.3
77
8945.9
17
2385.0
73
13065.7
89
14013.3
46
39401.0
578
241502.0
MULTI
PROJECTS
COST
($1,000)
1
500.0 29
5
375.0 38
3
31.5 150
16
2317.4 160
52
4527.1 96
21
716.6 91
26
4101.0 88
15
34240.2 54
30
2606.9 176
42
4511.7 223
£2
1984.2 123
233
55911.6 1,233
TOTAL

27
,955.0
140
,374.4
155
,588.5
427
,040.5
384
,902.9
320
,078.8
388
,582.2
94
,923.7
370
,208.4
603
,504.6
372
,638.7
3280
,797.7

-------
IV. EVALUATIONS

-------
                                                        IV-1
                       PROJECT EVALUATIONS

Fiscal Year 1991 pollution abatement and prevention projects for
Federal facilities and the Environmental Protection Agency's
evaluations of those projects, are listed on the following pages.
The projects of each reporting agency are listed together.  In
turn, the agency's projects are grouped according to the location
of the installation.  Projects contain information on the funding
account to be used, the compliance status of the facility, the
severity of the environmental impact of the pollutant, the State
in which each facility is located, and the environmental media
(air, water, solid waste, etc.) problem to be corrected.

Information on each project is divided into five parts:

     Project Identification - the project number assigned by
     the reporting agency, the facility identification
     number (FFID) assigned by the General Services
     Administration, an abbreviated description of the
     project, and the name and location of the facility.

     Budget (in thousands of dollars) -  the proposed
     funding of the project for FY 1991.

     Federal Facility Compliance Hierarchy - to provide a system
     for identifying compliance priorities, a hierarchy of nine
     different compliance categories has been established. These
     categories are divided into three distinct classes.

          Class I includes projects that are out of compliance,
          have been the subject to an enforcement action, or that
          involve a signed consent order or compliance agreement
          with EPA or a State government agency. EPA considers
          these projects to be of critical priority.

          Class II includes those projects that must be dealt
          with in an agency's current planning cycle to meet a
          compliance deadline in the immediate future. If
          projects in this class are not programmed for funding
          during the current budget cycle, they may be out of
          compliance before needed money can be provided.

          Class III includes other projects that the individual
          federal agencies believe are important but are not
          related to an imminent compliance requirement. Projects
          that will prevent pollution thorough changes in process
          technology, re-design, etc. are also included in this
          class.

-------
                                                   IV-2


Compliance Status - the status of the facility, with regard
to achieving compliance with an environmental standard, is
identified and defined by one of nine following acronyms.

In Class I, there are three compliance categories:

     CMPA: conditions of a signed Federal facility
           Compliance Agreement. Consent Order or
           equivalent State enforcement action.

     INOV: deficiencies found on inspections by regulatory
           authority or cited in Notice of Violation or
           equivalent.

     ESDP: does not meet established standard and deadline
           has passed.

In Class II, there are two compliance categories:

     ESDF: does not meet established standard and compliance
           deadline is in the future.

     PSDF: does not meet pending  standard and compliance
           deadline is in the future.

In Class III, there are four compliance categories:

     ESRO: meets established standard but needs replacement
           due to obsolescence.

     ESRE: meets established standard but needs replacement
           due to need for expansion.

     ESDL: meets established standard but needs to
           demonstrate leadership.

    OTHER: meets established standards but project needed
           for other reasons.

  CLASS  I               CLASS II                CLASS III

    CMPA                    ESDF                   ESRO

    INOV                    PSDF                   ESRE

    ESDP                                           ESDL

                                                   OTHER

-------
                                                        IV-3
   Environmental Impact -  the urgency of the project,  based
   on the severity of the impact of the pollutant on the
   immediate environment, is classified in one of three
   categories.

     H  (HIGH):  a project which is critical to the clean up of
     the local environment and to the agency's pollution
     abatement and prevention program at the facility in the
     budget year. And there are no feasible alternatives to
     funding the project as proposed, except for a Presidential
     exemption.

     M  (MEDIUM): a project which is important,  but not
     critical to clean up the local environment and to  the
     agency's pollution abatement and prevention program at the
     facility in the budget year; feasible alternatives to the
     project (including an exemption) are available.

     L  (LOW):  a project which is desirable, but deferral will
     have little or no negative effect on the local environment
     or on the agency's pollution abatement or prevention program
     at the facility in the budget year. In particular, there
     will be a negligible effect on its ability to meet required
     compliance standards.
The total number and estimated cost of all projects for each
agency are shown at the end of the project listing for the
agency-

-------
USDA

-------
DEPARTMENT OF
 AGRICULTURE

-------
                                                       USDA-1
THE UNITED STATES DEPARTMENT OF AGRICULTURE

The United States Department of Agriculture (USDA) manages
approximately 1,103 installations in the United States comprising
about 190 million acres. They also own 18,756 buildings
containing about 32 million square feet of floor space. The
Forest Service is by far the largest property owner, with 855
installations and most of the acreage under their control.  The
second largest bureau in USDA is the Agricultural Research
Service, with 181 installations and 394 thousand acres.

AGENCY POLLUTION ABATEMENT PLAN FOR FY 1991

The USDA proposed 769 projects totalling $61.8 million in their
A-106 environmental plan for FY 1991.

Reflecting the relative number of facilities in the different
bureaus within USDA, the Forest Service contributed the largest
number of projects to the environmental plan, with 740, totalling
$47.7 million. The Agricultural Research Service was next with 18
projects, totalling $13.6 million.  The Animal and Plant Health
Inspection Service submitted 3 projects, for a total of $327.5
thousand; the Soil Conservation Service submitted 3 projects for
a total of $164 thousand and the Food Safety and Inspection
Service submitted 5 projects, for a total of $16.8 thousand.

EPA evaluated the 769 projects according to the impact on the
local environment that would result if the projects were not
funded in FY 1991.  EPA rated 411 projects (budgeted at $41.2
million) as having "High" environmental impact.  "Medium" ratings
were assigned to 311 projects ($18.6 million) and "Low" ratings
to 47 projects ($2 million).

The distribution of projects across compliance classes for USDA
indicates that there are 407 Class I projects, those in the plan
for current compliance reasons, or 52.9 percent of the total
number of projects in the FY 1991 plan.  The 225 Class II
projects, those in the plan to permit the agency to meet near-
future compliance deadlines, make up 29.3 percent of the total;
and the 137 Class III projects, those in the plan for other
environmental reasons, make up 17.8 percent of the total.

The 769 projects proposed by USDA in their FY 1991 plan are
distributed across the various environmental media programs  in
the following pattern: 522 projects in the water and drinking
water area, costing $30.3 million; another 117 projects in the
solid waste and RCRA area, costing $8 million; plus 54 CERCLA
projects, costing $17.8 million.  Additionally, the agency
proposes 65 projects in the area of toxic substances, pesticides
and radiation, costing $2.9 million; and another  11 projects  in
the air pollution abatement area, costing $2.8 million.

-------
                                                                                         USDA-2
 BUREAU
                          TOTAL NUMBER AND DOLLARS REQUESTED FOR
                          POLLUTION ABATEMENT NEEDS FOR FY 1991
                                  DEPT OF AGRICULTURE
  FOOD SAFETY
 SOILCONSERV
ANIMAL&PUMSIT
FORESTRY SERV
   USDA-ARS
                                   100
1000
10000        100000       1000000
USDA FIG 1
                                     NUMBER of PROJECTS
                                     DOLLARS ($000)

-------
                             TOTAL NUMBER AND DOLLARS PROPOSED FOR
                               CLASS I, II, III PROJECTS FOR FY 1991
                                     DEPT OF AGRICULTURE
                                                                                           USDA-3
          CLASS I
         CLASS II
         CLASS
               100
1000
                                                 10000
100000
1000000
USDAFIG2
          PROJECTS

          DOLLARS ($000)

-------
                                                                                   USDA-4
   USDA - TABLE 1: EPA EVALUATION OF THE ENVIRONMENTAL IMPACT OF PROPOSED
                   POLLUTION ABATEMENT PROJECTS FOR FISCAL YEAR 1991
                   INCLUDING NUMBER AND COST
                         DEPARTMENT OF AGRICULTURE
COMPLIANCE *
STATUS

CMPA
INOV
ESDP
ESDF
PSDF
ESRO
ESRE
ESDL
OTHR
GRAND TOTAL
HIGH
PROJECTS
COST
($1,000)
3
34.5
34
6,862.5
320
31,572.1
39
997.8
6
1,606.6
7
64.5
0
0.0
1
5.0
1
10.0
411
41,153.0
MEDIUM
PROJECTS
COST
($1,000)
0
0.0
1
12.5
29
2,338.1
88
4,599.9
78
3,907.0
66
4,708.7
1
15.0
1
2.0
47
3,061.0
311
18,644.2
LOU
PROJECTS
COST
($1,000)
0
0.0
0
0.0
20
1,046.5
10
572.5
4
42.0
9
141.2
2
2.0
1
100.0
1
75.0
47
1,979.2
TOTAL
PROJECTS
COST
($1,000)
3
34.5
35
6,875.0
369
34 , 956 . 7
137
6,170.2
88
5,555.6
82
4,914.4
3
17.0
3
107.0
49
3,146.0
769
61,776.4
*  SEE SECTION III FOR  DEFINITIONS OF COMPLIANCE STATUS CATEGORIES

-------
     USDA -  TABLE 2:  NUMBER AND DOLLAR AMOUNT OF POLLUTION ABATEMENT PROJECTS FOR FEDERAL INSTALLATIONS
                       PROPOSED BY MAJOR COMMAND/BUREAU FOR FISCAL YEAR 1991 BY CLASS/COMPLIANCE  STATUS.*

                                       DEPARTMENT OF AGRICULTURE
                                                                                                                        USDA-5
MAJOR COMMAND/
BUREAU

AGRICULTURAL
RES SERV
FOREST SERV
CMPA
PROJECTS
COST
($1,000)

3
34.5
CLASS I
INOV
PROJECTS
COST
($1,000)
1
6,000.0
34
875.0
ESDP
PROJECTS
COST
($1,000)

_ 	 __ — -_
368
34 , 944 . 7
ANIMAL&PLANT
HEALTH
SOIL
CONSERVATION


	
1
12.0
_ 	 _ 	 	
FOOD SAFETY
t INSP
TOTAL
3
34.5
35
6,875.0
369
34,956.7
CLASS
ESDF
PROJECTS
COST
($1,000)
9
1,680.0
127
4,337.7
II
PSDF
	
PROJECTS
COST
($1,000)
6
3,164.0
	
80
2,239.6
1
152.5
2
152.0

137
6,170.2
88
5,555.6
ESRO
PROJECTS
COST
($1,000)
1
2,700.0
81
2,214.4

CLASS III
ESRE ESDL
PROJECTS PROJECTS
COST COST
($1,000) ($1,000)

3 2
17.0 7.0
1
100.0
	
OTHR
PROJECTS
COST
($1,000)
1
14.0
42
3,040.2
	
1
75.0

5
16.8
82
4,914.4
3 3
17.0 107.0
49
3,146.0
TOTAL
PROJECTS
COST
($1,000)
	
18
13,558.0
740
47,710.1
3
327. B
3
164.0
5
16.8
769
61,776.4
SEE SECTION III FOR  DEFINITIONS OF COMPLIANCE STATUS CATEGORIES

-------
                                                                                                       USDA-6
USDA - TABLE 3: NUMBER AND DOLLAR AMOUNT OF POLLUTION ABATEMENT PROJECTS PROPOSED BY
                MAJOR COMMAND/BUREAU AND ENVIRONMENTAL MEDIA FOR FISCAL YEAR 1991

                                DEPARTMENT OF AGRICULTURE
MAJOR COMMAND/
BUREAU AIR

AGRICULTURAL
RES SERV
FOREST SERV
ANIMAL&PLANT
HEALTH
SOIL
CONSERVATION
FOOD SAFETY
t INSP
TOTAL
PROJECTS
COST
($1,000)
4
1893.0
7
930.6



11
2823.6
DRINKING
WATER
PROJECTS
COST
($1,000)

305
6562.6



305
6562.6
NOISE PESTICIDES
PROJECTS PROJECTS
COST COST
($1,000) ($1,000)

15
312.0

1
122.0

16
434.0
RADIATION CERCLA
PROJECTS PROJECTS
COST COST
($1,000) ($1,000)
2
122.0
6 52
8.3 17703.0



6 5*
8.3 17825.0
RCRA
PROJECTS
COST
($1,000)
8
1732.0
100
5937.6
3
327.5
1
12.0
5
16.6
117
8025.9
TSCA
PROJECTS
COST
($1,000)
2
1111.0
41
1299.0



43
2410.0
WATER
PROJECTS
COST
($1,000)
2
8700.0
214
14957.0

1
30.0

217
23687.0
MULTI TOTAL
PROJECTS PROJECTS
COST COST
($1,000) ($1,000)
18
1 3558 . 0
740
47710.1
3
327.5
3
164.0
5
16.8
769
61776.4

-------
                                 FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR  1991

                         DEPARTMENT OF AGRICULTURE               AGRICULTURAL RESEARCH SERVICE
                PROJECT IDENTIFICATION
                     REQ     EST   PROJECT
  BUDGET     COMPL   COMPL   COMPL ASSESS- MEDIA
(THOUSANDS)   STATUS   DATE    DATE  MENT    TYPE
                                                                                                                     USDA-7
                           ADEQUACY OF PROJECT
                          ENGIN-
                          EERING    TIME      COST
AL-120530577 PROJECT: MDA-13005
UPGRADE UNDERGROUND STORAGE TANKS
ACCT: OTHER
SOIL DYNAMIC RESEARCH UNIT
AUBURN                           AL

AR-120535965 PROJECT: SPA-21001
INVESTIGATE ENVIRONMENTAL IMPACT OF SITE
ACCT: OTHER
SOUTH CENTRAL FAMILY FARM RES
BOONEVILLE                       AR

CA-120507342 PROJECT: PWA-31102
UTILITY UPGRADE ASBESTOS ABATEMENT
ACCT: OTHER
WESTERN REGIONAL RESEARCH CENTER
ALBANY                           CA

CA-120507376 PROJECT: PWA-13004
REMOVAL OF UST
ACCT: OTHER
FRESNO HORTICALTURAL FIELD STA
FRENSO                           CA

10-120507323 PROJECT: PWA-13001
REMOVAL OF UST'S
ACCT: OTHER
US SHEEP EXPERIMENT STATION
DUBOIS                           ID

ID-120515601 PROJECT: PWA-13002
REMOVAL OF UST'S
ACCT: OTHER
SOIL & WATER MGT RESEARCH UNIT
KIMBERLY                         ID
       10.0  ESDF
       61.0   ESDF
      239.0   PSDF
       14.0  OTHR
       24.0  ESDF
       14.0  ESDF
91/04 MEDIUM   SOLID     ADEQUATE  ADEQUATE   ADEQUATE
               WASTE      DESIGN    TIMING    ESTIMATE
90/09  HIGH    CERCLA    ADEQUATE  ADEQUATE   ADEQUATE
                         DESIGN    TIMING    ESTIMATE
90/09 MEDIUM   TOXIC    ADEQUATE   ADEQUATE   ADEQUATE
             SUBSTANCE    DESIGN    TIMING    ESTIMATE
90/09 MEDIUM   SOLID    ADEQUATE  ADEQUATE    ADEQUATE
               WASTE     DESIGN    TIMING    ESTIMATE
90/09 MEDIUM   SOLID
               WASTE
90/09  HIGH    SOLID
               WASTE
ADEQUATE  ADEQUATE   ADEQUATE
 DESIGN    TIMING    ESTIMATE
ADEQUATE  ADEQUATE   ADEQUATE
 DESIGN    TIMING    ESTIMATE

-------
                                  FEDERAL AGENCY  POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                         DEPARTMENT  OF  AGRICULTURE               AGRICULTURAL RESEARCH SERVICE
                PROJECT IDENTIFICATION
                     REQ    EST   PROJECT
  BUDGET     COMPL   COMPL  COMPL  ASSESS- MEDIA
(THOUSANDS)   STATUS  DATE    DATE   MENT    TYPE
                                                                     USDA-8
                            ADEQUACY OF PROJECT
                          ENGIN-
                          EERING    TIME      COST
 IL-120507344 PROJECT: MWA-31101
 REMOVE ASBESTOS
 ACCT: OTHER
 NORTHERN REGIONAL RESEARCH CENTER
 PEORIA                           IL

 LA-120507345 PROJECT: MDA-31101
 ABATEMENT OF ASBESTOS CONTAINING MATERIAL
 ACCT: OTHER
 SOUTHERN REGIONAL RESEARCH CENTER
 NEW ORLEANS                      LA

 MD-120506400 PROJECT: BA-31101
 ASBESTOS ABATEMENT
 ACCT: OTHER
 BELTSVILLE AREA ARS USDA
 BELTSVILLE                       MD

 MD-120506400 PROJECT: BA-13001
 RETROFIT AND REPLACE USTS
 ACCT: OTHER
 BELTSVILLE AREA ARS USDA
 BELTSVILLE                       MD

 MD-120506400 PROJECT: BA-41001
 REPLACE WASTEWATER TREATMENT FACILITIES
 ACCT: OTHER
 BELTSVILLE AREA ARS USDA
 BELTSVILLE                       MD

 MD-120506400 PROJECT: BA-41002
 INSTALLATION OF SEDIMENTATION LAGOON
ACCT: OTHER
BELTSVILLE AREA ARS USDA
BELTSVILLE                       MD
      872.0  PSDF
      993.0  PSDF
      400.0  PSDF
      625.0   ESDF
    6,000.0   INOV
    2.700.0   ESRO
                           90/09  MEDIUM   TOXIC    ADEQUATE  ADEQUATE   ADEQUATE
                                       SUBSTANCE   DESIGN    TIMING    ESTIMATE
                           90/09  HIGH     AIR     ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
                           90/09 MEDIUM    AIR     ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
90/09 MEDIUM   SOLID    ADEQUATE   ADEQUATE   ADEQUATE
               WASTE     DESIGN   TIMING    ESTIMATE
90/09  HIGH    WATER
90/09 MEDIUM   WATER
                        ADEQUATE  ADEQUATE   ADEQUATE
                         DESIGN    TIMING    ESTIMATE
                                                  ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE

-------
                                 FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL  YEAR  1991

                         DEPARTMENT OF AGRICULTURE               AGRICULTURAL RESEARCH  SERVICE
                PROJECT IDENTIFICATION
                    REQ    EST   PROJECT
  BUDGET     COMPL   COMPL  COMPL ASSESS- MEDIA
(THOUSANDS)   STATUS  DATE   DATE  MENT    TYPE
                                                                                                                     USDA-9
                           ADEQUACY OF PROJECT
                         ENGIN-
                         EERING    TIME      COST
MD-120508940 PROJECT: ARS-61001
SURVEY AND ABATE RADON LEVELS
ACCT: OTHER
GENERAL SERVICES DIVISION
HYATTSVILLE MD                   MD

MD-120508940 PROJECT: ARS-13001
UPGRADE UNDERGROUND STORAGE TANKS
ACCT: OTHER
GENERAL SERVICES DIVISION
HYATTSVILLE MD                   MD

MD-12050S940 PROJECT: ARS-11001
UPGRADE LANDFILLS
ACCT: OTHER
GENERAL SERVICES DIVISION
HYATTSVILLE MD                   MD

PA-120507341 PROJECT: NAA-31101
ASBESTOS ABATEMENT FIVE YEAR PLAN
ACCT: OTHER
EASTERN REGIONAL RESEARCH CENTER
WYNDMOOR                         PA

TN-120507339 PROJECT: MDA-13003
INVESTIGATE REMOVAL OF UNDERGROUND FUEL TANK
ACCT: OTHER
US DAIRY EXPERIMENT STATION
 LEWISBURG                        TN

TX-120511822 PROJECT: SPA-21007
 INVESTIGATE ENVIRONMENTAL IMPACT OF SITE
ACCT: OTHER
SUBTROPICAL AGRICULTURAL RES
WESLACO                          TX
      200.0   ESDF
      625.0   ESDF
      360.0   PSDF
      300.0   PSDF
       60.0  ESDF
       61.0  ESDF
                          90/09 MEDIUM    AIR
90/09 MEDIUM   SOLID
               WASTE
                         NOT
                         AVAIL
 NOT
AVAIL
           NOT
          AVAIL
 NOT
AVAIL
90/09 MEDIUM   SOLID      NOT       NOT
               WASTE     AVAIL     AVAIL
            NOT
           AVAIL
 NOT
AVAIL
                      NOT
                     AVAIL
90/09 MEDIUM    AIR     ADEQUATE  ADEQUATE   ADEQUATE
                         DESIGN    TIMING    ESTIMATE
90/09  HIGH    SOLID    ADEQUATE  ADEQUATE   ADEQUATE
               WASTE     DESIGN    TIMING    ESTIMATE
90/09  HIGH    CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
                         DESIGN    TIMING    ESTIMATE

-------
                           FEDERAL.AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR  1991                         USDA-10

                   DEPARTMENT OF AGRICULTURE               AGRICULTURAL RESEARCH  SERVICE

                                                               REQ    EST   PROJECT             ADEQUACY OF PROJECT
          PROJECT IDENTIFICATION            BUDGET     COMPL   COMPL  COMPL ASSESS- MEDIA      EN6IN-
                                          (THOUSANDS)  STATUS  DATE   DATE  MENT     TYPE       EERING    TIME      COST


TOTAL, AGRICULTURAL RESEARCH SERVICE                    13,558.0                      18

-------
                                 FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                         DEPARTMENT OF AGRICULTURE               FOREST SERVICE
                PROJECT IDENTIFICATION
                     REQ    EST   PROJECT
  BUDGET     COMPL   COMPL   COMPL ASSESS- MEDIA
(THOUSANDS)   STATUS  DATE    DATE  MENT    TYPE
                                                                                                                     USDA-11
  ADEQUACY OF PROJECT
ENGIN-
EERING    TIME      COST
AK-122360184 PROJECT:  1000000010
NAUKATI WORK CENTER WATER SYSTEM
ACCT: 25 SWA FUND SDWA
TONGASS NATIONAL FOREST - STIKINE AREA
PETERSBURG                       AK

AK-122360184 PROJECT:  1000000011
EL CAPTAIN WATER SYSTEM
ACCT: 25 SWA FUND SDWA
TONGASS NATIONAL FOREST - STIKINE AREA
PETERSBURG                       AK

AK-122360184 PROJECT: 1000000012
SUMEZ WORK CENTER WATER SYSTEM
ACCT: 25 SWA FUND SDWA
TONGASS NATIONAL FOREST - STIKINE AREA
PETERSBURG                       AK

AK-122360184 PROJECT: 1000000017
FALSE ISLAND CAMP WATER SYSTEM
ACCT: 25 SWA FUND SDWA
TONGASS NATIONAL FOREST - STIKINE AREA
PETERSBURG                       AK

AK-122360184 PROJECT: 1000000007
BLIND SLOUGH RECREATION AREA WATER SYSTEM
ACCT: 25 SWA FUND SDWA
TONGASS NATIONAL FOREST - STIKINE AREA
PETERSBURG                       AK

AK-122360184 PROJECT: 1000000008
MISTY FIORD BARGE WATER SYSTEM
ACCT: 25 SWA FUND SDWA
TONGASS NATIONAL FOREST - STIKINE AREA
PETERSBURG                       AK
       10.0  ESDP   74/12   91/01  HIGH   DRINKING  ADEQUATE  ADEQUATE   ADEQUATE
                                         WATER     DESIGN    TIMING    ESTIMATE
       12.0  ESDP   74/12   91/01  HIGH   DRINKING  ADEQUATE  ADEQUATE   ADEQUATE
                                         WATER     DESIGN    TIMING    ESTIMATE
        5.0   ESDP   74/12   91/07  HIGH   DRINKING  ADEQUATE  ADEQUATE   ADEQUATE
                                         WATER     DESIGN    TIMING    ESTIMATE
        5.0  ESDP   74/12   91/08  HIGH   DRINKING  ADEQUATE  ADEQUATE   ADEQUATE
                                          WATER     DESIGN    TIMING    ESTIMATE
       10.0  ESDP   74/12   91/01   HIGH    DRINKING   ADEQUATE  ADEQUATE   ADEQUATE
                                          WATER      DESIGN    TIMING    ESTIMATE
        8.0   ESDP   74/12   91/01   HIGH    DRINKING   ADEQUATE  ADEQUATE    ADEQUATE
                                          WATER      DESIGN     TIMING     ESTIMATE

-------
                                 FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                         DEPARTMENT OF AGRICULTURE               FOREST SERVICE
                                                                     USDA-12
                PROJECT IDENTIFICATION
                     REQ    EST   PROJECT
  BUDGET     COMPL   COMPL  COMPL ASSESS- MEDIA
(THOUSANDS)  STATUS  DATE   DATE  MENT    TYPE
  ADEQUACY OF PROJECT
ENGIN-
EERING    TIME      COST
AK-122360184 PROJECT: 1000000009
SHOAL COVE WATER SYSTEM
ACCT: 25 SWA FUND SDWA
TON3ASS NATIONAL FOREST - STIKINE AREA
PETERSBURG                       AK

AK-122360164 PROJECT: 1000000005
CHICKAMIN BARGE WATER SYSTEM
ACCT: 25 SHA FUND SDWA
TOHGASS NATIONAL FOREST - STIKINE AREA
PETERSBURG                       AK

AK-122360184 PROJECT: 1000000004
STEELHEAD BARGE WATER SYSTEM
ACCT: 25 SWA FUND SDWA
TONGASS NATIONAL FOREST - STIKINE AREA
PETERSBURG                       AK

AK-122360165 PROJECT: 1000000018
RUSSIAN RIVER STREAMBANK STABILIZATION
ACCT: 24 SWA FUND CWA-NPS
CHUGACH NF
ANCHORAGE                        AK

AR-122307226 PROJECT: 0810055008
WHITE ROCK CABINS FILTER SYSTEM
ACCT: 25 SWA FUND SDWA
OZARK-ST. FRANCIS N.F.
RUSSELLVILLE                     AR

AR-122307724 PROJECT: 0809030003
COLD SPRINGS WORK CENTER - WATER SYSTEM
ACCT: 25 SWA FUND SDWA
QUACHITA NATIONAL FOREST
GOT SPRINGS                      AR
        5.0  ESDP   74/12  91/08  HIGH    DRINKING  ADEQUATE  ADEQUATE   ADEQUATE
                                          WATER     DESIGN    TIMING    ESTIMATE
       22.0  ESRO   90/12  91/01  MEDIUM  DRINKING  ADEQUATE  ADEQUATE   ADEQUATE
                                         WATER     DESIGN    TIMING    ESTIMATE
       22.0  ESRO   90/12   91/01  MEDIUM  DRINKING  ADEQUATE  ADEQUATE   ADEQUATE
                                         WATER     DESIGN    TIMING    ESTIMATE
       15.0   ESDP   87/12   91/03  HIGH    WATER    ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
       40.0   ESDP   86/12   91/03  HIGH   DRINKING  ADEQUATE  ADEQUATE   ADEQUATE
                                         WATER     DESIGN    TIMING    ESTIMATE
       12.5   INOV    86/12   91/06 MEDIUM  DRINKING  ADEQUATE  ADEQUATE   ADEQUATE
                                         WATER     DESIGN    TIMING    ESTIMATE

-------
                                 FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR  FISCAL  YEAR  1991

                         DEPARTMENT OF AGRICULTURE               FOREST SERVICE
                PROJECT IDENTIFICATION
                                    REQ     EST    PROJECT
                 BUDGET     COMPL   COMPL   COMPL  ASSESS- MEDIA
               (THOUSANDS)  STATUS  DATE    DATE   MENT    TYPE
                                                                                                                     USDA-13
  ADEQUACY OF PROJECT
ENGIN-
EERING    TIME      COST
AR-122307724 PROJECT: 0809040008
FOURCHE WORK CENTER - WATER SYSTEM
ACCT: 25 SWA FUND SDWA
(3UACHITA NATIONAL FOREST
SOT SPRINGS                      AR
AR-122307726 PROJECT: 0810005001
REPLACE HANDPUMPS
ACCT: 25 SWA FUND SDWA
OZARK-ST. FRANCIS N.F.
RUSSELLVILLE
AR-122307726 PROJECT: 0810005002
REPLACE HANDPUMPS
ACCT: 25 SWA FUND SDWA
OZARK-ST. FRANCIS N.F.
RUSSELLVILLE
                                 AR
AR
AR-122307726 PROJECT: 0810055005
LAKE WEDINGTON REC. AREA WATER FILTER
ACCT: 25 SWA FUND SDWA
OZARK-ST. FRANCIS N.F.
RUSSELLVILLE                     AR

AR-122307726 PROJECT: 0810015003
BLANCHARD COMPLEX POTABLE WATER SYSTEM
ACCT: 25 SWA FUND SDWA
OZARK-ST. FRANCIS N.F.
RUSSELLVILLE                     AR

AR-122307726 PROJECT: 0810045004
HORSEHEAD BATH HOUSE WATER STORAGE
ACCT: 25 SWA FUND SDWA
OZARK-ST. FRANCIS N.F.
RUSSELLVILLE                     AR
                       2 5  ESDP   86/12   91/12  MEDIUM  DRINKING  ADEQUATE  ADEQUATE   ADEQUATE
                                                        WATER     DESIGN    TIMING    ESTIMATE
                      65.0  ESDP   87/01   91/01   HIGH   DEINKING    NOT       NOT        NOT
                                                        WATER     AVAIL     AVAIL      AVAIL
                      20.0  ESDP   87/01   91/01   HIGH   DRINKING    NOT       NOT        NOT
                                                        WATER     AVAIL     AVAIL      AVAIL
                       5.0  ESDP   87/01  91/04  HIGH    DRINKING    NOT       NOT        NOT
                                                         WATER      AVAIL     AVAIL      AVAIL
                      30.0  ESDP   87/01  91/06  HIGH    DRINKING  ADEQUATE   ADEQUATE    ADEQUATE
                                                         WATER      DESIGN     TIMING     ESTIMATE
                      28.0  ESDP   87/01  91/01   HIGH   DRINKING  ADEQUATE   ADEQUATE    ADEQUATE
                                                         WATER      DESIGN    TIMING    ESTIMATE

-------
                                 FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                         DEPARTMENT OF AGRICULTURE               FOREST SERVICE
                PROJECT IDENTIFICATION
                     REQ    EST    PROJECT
  BUDGET     COMPL   COMPL  COMPL  ASSESS- MEDIA
(THOUSANDS)   STATUS  DATE    DATE   MENT    TYPE
                                                                     USDA-14
   ADEQUACY OF PROJECT
 ENGIN-
 EERING    TIME      COST
AR-122307726 PROJECT: 0810055006
GRAY SPRINGS PICNIC AREA
ACCT: 25 SWA FUND SDWA
OZARK-ST. FRANCIS N.F.
RUSSELLVILLE                     AR

AR-122307726 PROJECT: 0810075007
STORM CREEK LAKE BATHHOUSE
ACCT: 25 SWA FUND SDWA
OZARK-ST. FRANCIS N.F.
RUSSELLVILLE                     AR

AR-122307726 PROJECT: 0810062002
ALDER GAP ROAD DUMP SITE
ACCT: 12 DEPT FUND RCRA
OZARK-ST. FRANCIS N.F.
RUSSELLVILLE                     AR

AR-122307726 PROJECT: 0810012001
ABANDONED SOLID WASTE DUMPS (5-SITES)
ACCT: 12 DEPT FUND RCRA
OZARK-ST. FRANCIS N.F.
RUSSELLVILLE                     AR

AR-122307726 PROJECT: 0810014002
BLANCHARD COMPLEX STORM DRAIN
ACCT: 2<+ SWA FUND CWA-NPS
OZARK-ST. FRANCIS N.F.
RUSSELLVILLE                     AR

AR-122307726 PROJECT: 0810053003
WHITE ROCK CABINS
ACCT: 23 SWA FUND CWA-PS
OZARK-ST. FRANCIS N.F.
RUSSELLVILLE                     AR
       10.0  ESDP   87/01   90/09   HIGH   DRINKING  ADEQUATE  ADEQUATE   ADEQUATE
                                         WATER     DESIGN    TIMING    ESTIMATE
        5.0  ESDP   87/01   91/01  HIGH   DRINKING  ADEQUATE  ADEQUATE   ADEQUATE
                                         WATER     DESIGN    TIMING    ESTIMATE
        5.0  ESDP   87/01   91/01  HIGH    SOLID
                                         WASTE
       75.0  ESDP   86/01   91/01  HIGH    SOLID
                                         WASTE
       10.1   ESDF    92/12   92/01 MEDIUM   WATER
 NOT
AVAIL
 NOT
AVAIL
 NOT
AVAIL
 NOT
AVAIL
 NOT
AVAIL
 NOT
AVAIL
                                                  ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
       15.0   ESRO   91/09   91/01  HIGH    WATER    ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE

-------
                                  FEDERAL AGENCY  POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                          DEPARTMENT  OF  AGRICULTURE               FOREST SERVICE
                 PROJECT  IDENTIFICATION
                     REQ     EST   PROJECT
  BUDGET     COMPL    COMPL   COMPL ASSESS- MEDIA
(THOUSANDS)   STATUS   DATE    DATE  MENT    TYPE
                                                                                                                      USDA-15
  ADEQUACY OF PROJECT
ENGIN-
EERING    TIME      COST
AZ-122300000  PROJECT:  0300000124
AZ PUBLIC WATER SYSTEMS VOC TESTS
ACCT: 25 SWA  FUND  SDWA
USDA FOREST SERVICE
ALBUQUERQUE                      AZ

AZ-122307545  PROJECT:  03050*0211
SHANNON REC SITE WATER SYSTEM
ACCT: 25 SWA  FUND  SDWA
CORONADO
TUSCON                           AZ

AZ-122307545  PROJECT:  0305050212
PEPPERSAUSE REC SITE WATER SYSTEM
ACCT: 25 SWA  FUND  SDWA
CORONADO
TUSCON                           AZ

AZ-122307545  PROJECT:  0305050152
MOLINO BASIN  WATER SYSTEM
ACCT: 25 SWA  FUND  SDWA
CORONADO
TUSCON                           AZ

AZ-122307545  PROJECT: 0305040153
NOON CREEK
ACCT: 25 SWA  FUND  SDWA
CORONADO
TUSCON                           AZ

AZ-122307545  PROJECT: 0305020154
PENA BLANCA REC SITE WATER SYSTEM
ACCT: 25 SWA  FUND  SDWA
CORONADO
TUSCON                           AZ
       11.0   PSDF    90/12   90/11 MEDIUM  DRINKING    NOT       NOT        NOT
                                         WATER     AVAIL     AVAIL      AVAIL
        1.0   ESDF    92/12   91/01 MEDIUM  DRINKING  ADEQUATE  ADEQUATE   ADEQUATE
                                         WATER     DESIGN    TIMING    ESTIMATE
        1.0  ESDF    91/12   91/01 MEDIUM  DRINKING  ADEQUATE  ADEQUATE   ADEQUATE
                                         WATER     DESIGN    TIMING    ESTIMATE
       20.0   PSDF    90/12   91/03 MEDIUM  DRINKING  ADEQUATE  ADEQUATE   ADEQUATE
                                         WATER     DESIGN    TIMING    ESTIMATE
       16.5  PSDF    90/12   91/03 MEDIUM  DRINKING  ADEQUATE  ADEQUATE   ADEQUATE
                                         WATER     DESIGN    TIMING    ESTIMATE
        8.0   ESRO    91/12   91/01   LOW    DRINKING  ADEQUATE  ADEQUATE   ADEQUATE
                                         WATER     DESIGN    TIMING    ESTIMATE

-------
                                 FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                         DEPARTMENT OF AGRICULTURE               FOREST SERVICE
                PROJECT IDENTIFICATION
                     REQ    EST   PROJECT
  BUDGET     COMPL   COMPL  COMPL ASSESS- MEDIA
(THOUSANDS)  STATUS  DATE   DATE  MENT     TYPE
                                                                     USDA-16
  ADEQUACY OF PROJECT
ENGIN-
EERING    TIME      COST
AZ-122307545 PROJECT: 0305020210
BOG SPRINGS REC SITE WATER SYSTEM
ACCT: 25 SWA FUND SDWA
CORONADO
TUSCON                           AZ

AZ-122307546 PROJECT: 0304000148
FT. VALLEY EXP. STATION WATER SYSTEM
ACCT: 25 SWA FUND SDWA
COCONINO
FLAGSTAFF                        AZ

AZ-122307546 PROJECT: 0304060150
CAVE SPRING CAMPGROUND WATER SYSTEM
ACCT: 25 SWA FUND SDWA
COCONINO
FLAGSTAFF                        AZ

AZ-122307546 PROJECT: 0304060151
BANJO BILL CAMPGROUND WATER SYSTEM
ACCT: 25 SWA FUND SDWA
COCONINO
FLAGSTAFF                        AZ

AZ-122307546 PROJECT: 0304050149
DOUBLE SPRING CAMPGROUND WATER SYSTEM
ACCT: 25 SWA FUND SDWA
COCONINO
FLAGSTAFF                        AZ

AZ-122307546 PROJECT: 0304070085
BLUE RIDGE R.S. DUPLEX 49B RADON
ACCT: 27 SWA FUND TSCA
COCONINO
FLAGSTAFF                        AZ
        8.0  ESRO   91/12  91/01   LOW    DRINKING  ADEQUATE  ADEQUATE   ADEQUATE
                                          WATER     DESIGN    TIMING    ESTIMATE
        1.0  PSDF   90/12   91/09 MEDIUM   DRINKING  ADEQUATE  ADEQUATE   ADEQUATE
                                          WATER     DESIGN    TIMING    ESTIMATE
        1.0  PSDF   90/12   91/03 MEDIUM  DRINKING  ADEQUATE  ADEQUATE   ADEQUATE
                                         WATER     DESIGN    TIMING    ESTIMATE
        1.0  PSDF   90/12   91/03  MEDIUM  DRINKING  ADEQUATE  ADEQUATE   ADEQUATE
                                         WATER     DESIGN    TIMING    ESTIMATE
        1.0  ESRE   93/10   91/03   LOW    DRINKING  ADEQUATE  ADEQUATE   ADEQUATE
                                         WATER     DESIGN    TIMING    ESTIMATE
        2.0   ESDF    90/07   91/03  HIGH  RADIATION  ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE

-------
                                 FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR  1991

                         DEPARTMENT OF AGRICULTURE               FOREST SERVICE
                PROJECT IDENTIFICATION
                     REQ     EST   PROJECT
  BUDGET     COMPL    COMPL   COMPL ASSESS- MEDIA
(THOUSANDS)   STATUS   DATE    DATE  MENT    TYPE
                                                                                                                     USDA-17
  ADEQUACY OF PROJECT
ENGIN-
EERING    TIME      COST
AZ-122307546 PROJECT: 0304010062
BEAVER CREEK LAGOONS
ACCT: 23 SWA FUND CWA-PS
COCONINO
FLAGSTAFF                        AZ

AZ-122307549 PROJECT: 0301060127
COLONEL SPRING
ACCT: 25 SWA FUND SDWA
APACHE-SITGREAVES
SPRINGERVILLE                    AZ

AZ-122307554 PROJECT: 0307030174
DEMOTTE CAMPGROUND WATER SYSTEM
ACCT: 25 SWA FUND SDWA
KAIBAB
WILLIAMS                         AZ

AZ-122307554 PROJECT: 0307040214
TUSAYAN ADMIN SITE RADON
ACCT: 27 SWA FUND TSCA
KAIBAB
WILLIAMS                         AZ

AZ-122307554 PROJECT: 0307040217
TUSAYAN ADMIN SITE RADON
ACCT: 27 SWA FUND TSCA
KAIBAB
WILLIAMS                         AZ

AZ-122307554 PROJECT: 0307010215
CAMP CLOVER ADMIN SITE RADON
ACCT: 27 SWA FUND TSCA
KAIBAB
WILLIAMS                         AZ
        5.0   ESDP    77/12   91/03  HIGH    WATER    ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
        2.2   PSDF    90/12   91/03 MEDIUM  DRINKING  ADEQUATE  ADEQUATE   ADEQUATE
                                         WATER     DESIGN    TIMING    ESTIMATE
       10.0  ESDP    74/12   91/08  HIGH   DRINKING  ADEQUATE  ADEQUATE   ADEQUATE
                                         WATER     DESIGN    TIMING    ESTIMATE
        5.9  ESDF    90/07   90/09  HIGH  RADIATION  ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
        0.1   ESDF    90/07   90/11  HIGH   RADIATION  ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
        0.1   ESDF    90/07  90/11   HIGH   RADIATION   ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE

-------
                                 FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                         DEPARTMENT OF AGRICULTURE               FOREST SERVICE
                PROJECT IDENTIFICATION
                     REQ    EST   PROJECT
  BUDGET     COMPL   COMPL  COMPL ASSESS-  MEDIA
(THOUSANDS)  STATUS  DATE   DATE   MENT     TYPE
                                                                     USDA-18
  ADEQUACY OF PROJECT
ENGIN-
EERING    TIME      COST
AZ-122307554 PROJECT: 0307020086
SPRING VALLEY ADMIN SITE RADON
ACCT: 27 SWA FUND TSCA
KAIBAB
WILLIAMS                         AZ

AZ-122307554 PROJECT: 0307030091
BIG SPRINGS ADMIN SITE RADON
ACCT: 27 SWA FUND TSCA
KAIBAB
WILLIAMS                         AZ

AZ-122307554 PROJECT: 0307000206
KAIBAB ASBESTOS INSPECTION/ABATEMENT
ACCT: 27 SWA FUND TSCA
KAIBAB
WILLIAMS                         AZ

AZ-122307554 PROJECT: 0307010074
S. KAIBAB DEPOT LAGOON LINER
ACCT: 23 SWA FUND CWA-PS
KAIBAB
WILLIAMS                         AZ

AZ-122307555 PROJECT: 0309050177
ELKS WELL NO. 1 WATER SYSTEM
ACCT: 25 SWA FUND SDWA
PRESCOTT NF
PRESCOTT                         AZ

AZ-122307555 PROJECT: 0309050176
POWELL SPRINGS CG WATER SYSTEM
ACCT: 25 SWA FUND SDWA
PRESCOTT NF
PRESCOTT                         AZ
        0.1  ESDF   90/07  90/10   HIGH  RADIATION  ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
        0.1  ESDF   90/07  90/10   HIGH  RADIATION  ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
         .0  ESDP   86/12   92/03  HIGH    TOXIC    ADEQUATE  ADEQUATE   ADEQUATE
                                       SUBSTANCE   DESIGN    TIMING    ESTIMATE
        2.0  ESDP   77/12   91/08  HIGH    WATER    ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
        5.0   ESDP    91/10   91/03  HIGH   DRINKING  ADEQUATE  ADEQUATE   ADEQUATE
                                         WATER     DESIGN    TIMING    ESTIMATE
        2.8  ESDP    91/10   91/03  HIGH   DRINKING  ADEQUATE  ADEQUATE   ADEQUATE
                                         WATER     DESIGN    TIMING    ESTIMATE

-------
                                  FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                          DEPARTMENT OF AGRICULTURE               FOREST SERVICE
                 PROJECT  IDENTIFICATION
                     REQ    EST   PROJECT
  BUDGET     COMPL    COMPL  COMPL ASSESS- MEDIA
(THOUSANDS)   STATUS   DATE   DATE  MENT    TYPE
                                                                                                                     USDA-19
  ADEQUACY OF PROJECT
ENGIN-
EERING    TIME      COST
AZ-122307555 PROJECT: 0309030175
THUMB BUTTE REC AREA WATER SYSTEM
ACCT: 25 SWA FUND SDWA
PRESCOTT NF
PRESCOTT                         AZ

AZ-122307555 PROJECT: 0309030178
HORSETHIEF BASIN REC AREA WATER SYSTEM
ACCT: 25 SWA FUND SDWA
PRESCOTT NF
PRESCOTT                         AZ

AZ-122307555 PROJECT: 0309010207
CHINO VALLEY RS WATER SYSTEM
ACCT: 25 SWA FUND SDWA
PRESCOTT NF
PRESCOTT                         AZ

AZ-122307555 PROJECT: 0309010222
WALNUT CREEK W.C.  WATER SYSTEM
ACCT: 25 SWA FUND SDWA
PRESCOTT NF
PRESCOTT                         AZ

AZ-122307555 PROJECT: 0309030007
GROOM CREEK W.C. WATER SYSTEM
ACCT: 25 SWA FUND SDWA
PRESCOTT NF
PRESCOTT                         AZ

AZ-122307555 PROJECT: 0309030009
CROWN KING W.C. WATER SYSTEM
ACCT: 25 SWA FUND SDWA
PRESCOTT NF
PRESCOTT                         AZ
        5 7  ESDP    91/10   91/03  HIGH   DRINKING  ADEQUATE  ADEQUATE   ADEQUATE
                                         WATER     DESIGN    TIMING    ESTIMATE
        0.4  ESDP   90/12   91/03  HIGH   DRINKING  ADEQUATE  ADEQUATE   ADEQUATE
                                         WATER     DESIGN    TIMING    ESTIMATE
        2.8   ESDF    90/12   91/03  MEDIUM  DRINKING  ADEQUATE  ADEQUATE   ADEQUATE
                                         WATER     DESIGN    TIMING    ESTIMATE
        2.3  ESRO   91/10   91/03 MEDIUM   DRINKING   ADEQUATE  ADEQUATE   ADEQUATE
                                          WATER     DESIGN    TIMING    ESTIMATE
        9.2   ESRO   91/10   91/03 MEDIUM  DRINKING   ADEQUATE   ADEQUATE    ADEQUATE
                                          WATER      DESIGN    TIMING     ESTIMATE
       20.3  ESRO   91/10   91/03 MEDIUM  DRINKING  ADEQUATE   ADEQUATE    ADEQUATE
                                          WATER      DESIGN    TIMING    ESTIMATE

-------
                 FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

         DEPARTMENT OF AGRICULTURE               FOREST SERVICE
                                                                                                                      USDA-20
PROJECT IDENTIFICATION
                                                                     REQ    EST   PROJECT
                                                  BUDGET     COMPL   COMPL  COMPL ASSESS- MEDIA
                                                (THOUSANDS)  STATUS  DATE   DATE  MENT    TYPE
  ADEQUACY OF PROJECT
ENGIN-
EERING    TIME      COST
AZ-122307555 PROJECT: 0309050208
MINGUS MTN W.C. WATER SYSTEM
ACCT: 25 SWA FUND SDWA
PRESCOTT NF
PRESCOTT                         AZ

AZ-122307555 PROJECT: 0309000204
PRESCOTT PESTICIDE DISPOSAL
ACCT: 12 DEPT FUND RCRA
PRESCOTT NF
PRESCOTT                         AZ

AZ-122307555 PROJECT: 0309050030
SYCAMORE W.C. UST
ACCT: 12 DEPT FUND RCRA
PRESCOTT NF
PRESCOTT                         AZ

AZ-122307557 PROJECT: 0301070125
LOS BURROS SPRING
ACCT: 25 SWA FUND SDWA
APACHE-SITGREAVES
SPRINGERVILLE                    AZ

AZ-122307557 PROJECT: 0301040128
WOODS CANYON REC SITE WATER SYSTEM
ACCT: 25 SWA FUND SDWA
APACHE-SITGREAVES
SPRINGERVILLE                    AZ

AZ-122307558 PROJECT: 0312050219
REYNOLDS CREEK GROUP CAMP WATER SYSTEM
ACCT: 25 SWA FUND SDWA
TONTO NF
PHOENIX                          AZ
                                        1.3  ESRO   91/10  91/03 MEDIUM  DRINKING  ADEQUATE   ADEQUATE    ADEQUATE
                                                                          WATER     DESIGN     TIMING     ESTIMATE
                                        4.0  ESDP   88/12  90/11  HIGH  PESTICIDES  ADEQUATE  ADEQUATE   ADEQUATE
                                                                                    DESIGN    TIMING    ESTIMATE
                                        9.4  PSDF   90/12  90/09 MEDIUM   SOLID    ADEQUATE  ADEQUATE   ADEQUATE
                                                                          WASTE      DESIGN    TIMING    ESTIMATE
                                        2.0  ESDP   74/12  91/03  HIGH    DRINKING  ADEQUATE  ADEQUATE   ADEQUATE
                                                                          WATER     DESIGN    TIMING    ESTIMATE
                                        1.0  ESRE   93/06  91/12   LOW     DRINKING  ADEQUATE  ADEQUATE   ADEQUATE
                                                                          WATER     DESIGN    TIMING    ESTIMATE
                                        1.0  ESDP   91/10  91/03  HIGH   DRINKING  ADEQUATE  ADEQUATE   ADEQUATE
                                                                         WATER     DESIGN    TIMING    ESTIMATE

-------
                                 FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR  FISCAL  YEAR  1991

                         DEPARTMENT OF AGRICULTURE               FOREST SERVICE
                 PROJECT  IDENTIFICATION
                    REQ    EST   PROJECT
  BUDGET     COMPL   COMPL  COMPL ASSESS- MEDIA
(THOUSANDS)   STATUS  DATE   DATE  MENT    TYPE
                                                                                                                     USDA-21
    ADEQUACY  OF  PROJECT
  ENGIN-
  EERING    TIME      COST
AZ-122307558 PROJECT: 0312050192
REYNOLDS CREEK ADMIN SITE WATER SYSTEM
ACCT: 25 SWA FUND SDWA
TONTO NF
PHOENIX                          AZ

AZ-122307558 PROJECT: 0312010190
ASHDALE ADMIN SITE WATER SYSTEM
ACCT: 25 SWA FUND SDWA
TONTO NF
PHOENIX                          AZ

AZ-122307558 PROJECT: 0312040196
CHRISTOPHER CREEK CAMPGROUND WATER SYSTEM
ACCT: 25 SWA FUND SDWA
TONTO NF
PHOENIX                          AZ

AZ-122307558 PROJECT: 0312040199
PONDEROSA CAMPGROUND WATER SYSTEM
ACCT: 25 SWA FUND SDWA
TONTO NF
PHOENIX                          AZ

AZ-122307558 PROJECT: 0312060093
PUNKIN CENTER UST
ACCT: 12 DEPT FUND RCRA
TONTO NF
PHOENIX                          AZ

AZ-122307558 PROJECT: 0312050051
PLEASANT VALLEY R.S. LAGOON
ACCT: 23 SWA FUND CWA-PS
TONTO NF
PHOENIX                          AZ
        0  5   ESDP    91/10  91/03  HIGH   DRINKING    NOT       NOT        NOT
                                         WATER     AVAIL     AVAIL      AVAIL
       10.8  ESDP    87/12  91/03  HIGH   DRINKING  ADEQUATE  ADEQUATE   ADEQUATE
                                         WATER     DESIGN    TIMING    ESTIMATE
        1.0   ESDP   91/10   91/03  HIGH   DRINKING  ADEQUATE  ADEQUATE   ADEQUATE
                                         WATER     DESIGN    TIMING    ESTIMATE
       69.9  ESRO   91/10   90/09   LOW    DRINKING  ADEQUATE  ADEQUATE   ADEQUATE
                                         WATER     DESIGN    TIMING    ESTIMATE
       15.0   ESDF    90/10   90/09 MEDIUM   SOLID
                                         WASTE
      350.0   ESRO   92/06   90/09  MEDIUM    WATER
ADEQUATE  ADEQUATE   ADEQUATE
 DESIGN    TIMING    ESTIMATE
ADEQUATE  ADEQUATE   ADEQUATE
 DESIGN    TIMING    ESTIMATE

-------
                                 FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                         DEPARTMENT OF AGRICULTURE               FOREST SERVICE
                PROJECT IDENTIFICATION
                     REQ    EST   PROJECT
  BUDGET     COMPL   COMPL  COMPL  ASSESS- MEDIA
(THOUSANDS)   STATUS  DATE    DATE   MENT    TYPE
                                                                     USDA-22
  ADEQUACY OF PROJECT
ENGIN-
EERING    TIME      COST
AZ-122316229 PROJECT: 2800000002
REMOVAL OF UNDERGROUND STORAGE TANKS
ACCT: 12 DEPT FUND RCRA
SANTA RITA EXPER. RANGE
GREEN VALLEY                     AZ

CA-122300001 PROJECT: 0520000001
REGIONWIDE CLEANUP OF MINOR HAZMAT SPILLS
ACCT: 11 DEPT FUND CERCLA
REGIONAL OFFICE - PHEC
PLEASANT HILL                    CA

CA-122307613 PROJECT: 0*17015001
DOG VALLEY GUARD STATION WATER SYSTEM
ACCT: 25 SWA FUND SDWA
TOIYABE NATIONAL FOREST
BRIDGEPORT                       CA

CA-122307613 PROJECT: 0*17011002
ZACCA MINE TAILINGS
ACCT: 11 DEPT FUND CERCLA
TOIYABE NATIONAL FOREST
BRIDGEPORT                       CA

CA-122307627 PROJECT: 0508010005
INVESTIGATE OLD LANDFILL
ACCT: 11 DEPT FUND CERCLA
ANGELES NATIONAL FOREST
ARCADIA                          CA

CA-122307627 PROJECT: 0501500101
ARCADIA SERVICE CENTER FUELS TANKS REMOVAL
ACCT: 12 DEPT FUND RCRA
ANGELES NATIONAL FOREST
ARCADIA                          CA
       11.0  CMPA   89/12   90/09   HIGH    SOLID    ADEQUATE  ADEQUATE   ADEQUATE
                                         WASTE     DESIGN    TIMING    ESTIMATE
       80.0  ESDF   94/09  90/09 MEDIUM   CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
       10.0  ESDP   77/05  91/06  HIGH   DRINKING  ADEQUATE  ADEQUATE   ADEQUATE
                                         WATER     DESIGN    TIMING    ESTIMATE
       25.0  ESDF   87/07  91/09 MEDIUM   CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
       50.0  ESDF    86/10   90/09  HIGH    CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
       60.0   ESDF    89/08   90/09 MEDIUM   SOLID    ADEQUATE  ADEQUATE   ADEQUATE
                                         WASTE     DESIGN    TIMING    ESTIMATE

-------
                                 FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL  YEAR  1991

                         DEPARTMENT OF AGRICULTURE               FOREST SERVICE
                 PROJECT  IDENTIFICATION
                     REQ    EST   PROJECT
  BUDGET     COMPL    COMPL  COMPL ASSESS- MEDIA
(THOUSANDS)   STATUS   DATE   DATE  MENT    TYPE
                                                                                                                     USDA-23
    ADEQUACY OF PROJECT
  ENGIN-
  EERING    TIME      COST
CA-122307627  PROJECT:  0501510101
OAK GROVE STN FUELS TANKS REMOVAL
ACCT:  12 DEPT FUND RCRA
ANGELES NATIONAL FOREST
ARCADIA                          CA

CA-122307627  PROJECT:  0501510102
CHILAO FIRE STN FUEL TANK REMOVAL
ACCT:  12 DEPT FUND RCRA
ANGELES NATIONAL FOREST
ARCADIA                          CA

CA-122307627  PROJECT:  0501510103
RED BOX FIRE  STN FUEL  TANK REMOVAL
ACCT: 12 DEPT FUND RCRA
ANGELES NATIONAL FOREST
ARCADIA                          CA

CA-122307627  PROJECT:  0501510104
CLEAR CREEK FIRE STN FUEL TANK REMOVAL
ACCT: 12 DEPT FUND RCRA
ANGELES NATIONAL FOREST
ARCADIA                          CA

CA-122307627 PROJECT:  0501510105
SHORTCUT FIRE STN FUELS TANKS REMOVAL & REPL
ACCT:  12 DEPT FUND RCRA
ANGELES NATIONAL FOREST
ARCADIA                          CA

CA-122307627  PROJECT:  0501520105
MT BALDY FIRE STN FUEL TANK REMOVAL
ACCT:  12 DEPT FUND RCRA
ANGELES NATIONAL FOREST
ARCADIA                          CA
       30.0   ESDF   89/08   90/09 MEDIUM   SOLID
                                         WASTE
       15.0   ESDF   89/08   90/09 MEDIUM   SOLID
                                         WASTE
       20.0   ESDF   89/08   90/09 MEDIUM   SOLID
                                         WASTE
       15.0   ESDF   89/08   90/09 MEDIUM   SOLID
                                         WASTE
       75.0   ESDF    89/08   90/09 MEDIUM   SOLID
                                         WASTE
       20.0   ESDF    89/08   90/09 MEDIUM   SOLID
                                         WASTE
ADEQUATE  ADEQUATE   ADEQUATE
 DESIGN    TIMING    ESTIMATE
ADEQUATE  ADEQUATE   ADEQUATE
 DESIGN    TIMING    ESTIMATE
ADEQUATE  ADEQUATE   ADEQUATE
 DESIGN    TIMING    ESTIMATE
ADEQUATE  ADEQUATE   ADEQUATE
 DESIGN    TIMING    ESTIMATE
ADEQUATE  ADEQUATE   ADEQUATE
 DESIGN    TIMING    ESTIMATE
ADEQUATE  ADEQUATE   ADEQUATE
 DESIGN    TIMING    ESTIMATE

-------
                                 FEDERAL ASENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                         DEPARTMENT OF AGRICULTURE               FOREST SERVICE
                PROJECT IDENTIFICATION
                     REQ    EST   PROJECT
  BUDGET     COMPL   COMPL  COMPL ASSESS- MEDIA
(THOUSANDS)  STATUS  DATE   DATE   MENT     TYPE
                                                                     USDA-24
    ADEQUACY OF PROJECT
  ENGIN-
  EERING    TIME      COST
CA-122307627 PROJECT: 0501520106
RINCON FIRE STATION FUEL TANK REMOVAL
ACCT: 12 DEPT FUND RCRA
ANGELES NATIONAL FOREST
ARCADIA                          CA

CA-122307627 PROJECT: 0501530102
GREEN VALLEY FIRE STN FUEL TANK REMOV 4 REPLAC
ACCT: 12 DEPT FUND RCRA
ANGELES NATIONAL FOREST
ARCADIA                          CA

CA-122307627 PROJECT: 0501530103
EMIGRATE LANDING ADM SITE FUELS TANKS REMOV
ACCT: 12 DEPT FUND RCRA
ANGELES NATIONAL FOREST
ARCADIA                          CA

CA-122307627 PROJECT: 0501530104
RED MTN FIRE STN FUEL TANK REMOVAL
ACCT: 12 DEPT FUND RCRA
ANGELES NATIONAL FOREST
ARCADIA                          CA

CA-122307627 PROJECT: 0501530105
OAK FLAT FIRE STATION FUELS TANKS REMOVAL
ACCT: 12 DEPT FUND RCRA
ANGELES NATIONAL FOREST
ARCADIA                          CA

CA-122307627 PROJECT: 0501530106
LOS ALMOS WORK CTR FUEL TANK MONITOR EQUIP
ACCT: 12 DEPT FUND RCRA
ANGELES NATIONAL FOREST
ARCADIA                          CA
       20.0  ESDF   89/08  90/09  MEDIUM   SOLID
                                         WASTE
       40.0  ESDF   89/08  90/09  MEDIUM   SOLID
                                         WASTE
       35.0  ESDF   89/08  90/09 MEDIUM   SOLID
                                         WASTE
       15.0  ESDF    89/08  90/09 MEDIUM   SOLID
                                         WASTE
       22.0  ESDF    89/08   90/09 MEDIUM   SOLID
                                         WASTE
         .0   ESDF    89/08   90/09 MEDIUM   SOLID
                                         WASTE
ADEQUATE  ADEQUATE   ADEQUATE
 DESIGN    TIMING    ESTIMATE
ADEQUATE  ADEQUATE   ADEQUATE
 DESIGN    TIMING    ESTIMATE
ADEQUATE  ADEQUATE   ADEQUATE
 DESIGN    TIMING    ESTIMATE
ADEQUATE  ADEQUATE   ADEQUATE
 DESIGN    TIMING    ESTIMATE
ADEQUATE  ADEQUATE   ADEQUATE
 DESIGN    TIMING    ESTIMATE
ADEQUATE  ADEQUATE   ADEQUATE
 DESIGN    TIMING    ESTIMATE

-------
                                  FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL  YEAR  1991

                          DEPARTMENT  OF AGRICULTURE               FOREST SERVICE
                 PROJECT IDENTIFICATION
                    REQ    EST   PROJECT
  BUDGET     COMPL   COMPL  COMPL ASSESS- MEDIA
(THOUSANDS)  STATUS  DATE   DATE  MENT    TYPE
                                                                                                                     USDA-25
    ADEQUACY OF PROJECT
  ENGIN-
  EERING    TIME      COST
 CA-122307627 PROJECT:  0501540102
 AREA IV WORK CTR FUELS TANKS REMOV  t  REPLAC
 ACCT:  12 DEPT FUND  RCRA
 ANGELES NATIONAL FOREST
 ARCADIA                         CA

 CA-122307627 PROJECT:  0501550101
 LITTLE  TUJUNGA STATION FUELS TANKS  REMOVAL
 ACCT:  12 DEPT FUND  RCRA
 ANGELES NATIONAL FOREST
 ARCADIA                         CA

 CA-122307627 PROJECT:  0501550102
 BEAR DIVIDE  FIRE  STN FUEL TANK REMOVAL
 ACCT: 12  DEPT FUND  RCRA
 ANGELES  NATIONAL  FOREST
 ARCADIA                          CA

 CA-122307627 PROJECT:  0501550103
 BIG TUJUNGA  FIRE  STATION FUEL TANK REMOVAL
 ACCT: 12  DEPT  FUND  RCRA
 ANGELES NATIONAL  FOREST
 ARCADIA                          CA

 CA-122307627  PROJECT:  0501550104
 MILL CREEK FIRE STATION FUEL TANK REMOVAL
 ACCT: 12 DEPT FUND RCRA
 ANGELES NATIONAL  FOREST
 ARCADIA                          CA

 CA-122307627 PROJECT: 0501550105
 MONTE CRISTO FIRE STN FUELS TANKS REMOVAL
ACCT: 12 DEPT FUND RCRA
ANGELES NATIONAL  FOREST
ARCADIA                          CA
       20.0   ESDF   89/08  90/09 MEDIUM   SOLID
                                         WASTE
       50.0   ESDF   89/08  90/09 MEDIUM   SOLID
                                         WASTE
       15.0  ESDF   89/08  90/09 MEDIUM   SOLID
                                         WASTE
       15.0  ESDF   89/08  90/09 MEDIUM   SOLID
                                         WASTE
       15.0  ESDF   89/08  90/09 MEDIUM   SOLID
                                         WASTE
      24.0  ESDF   89/08  90/09 MEDIUM   SOLID
                                         WASTE
ADEQUATE  ADEQUATE
 DESIGN    TIMING
ADEQUATE
ESTIMATE
ADEQUATE  ADEQUATE   ADEQUATE
 DESIGN    TIMING    ESTIMATE
ADEQUATE  ADEQUATE   ADEQUATE
 DESIGN    TIMING    ESTIMATE
ADEQUATE  ADEQUATE   ADEQUATE
 DESIGN    TIMING    ESTIMATE
ADEQUATE  ADEQUATE   ADEQUATE
 DESIGN    TIMING    ESTIMATE
ADEQUATE  ADEQUATE   ADEQUATE
 DESIGN    TIMING    ESTIMATE

-------
                                 FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                         DEPARTMENT OF AGRICULTURE               FOREST SERVICE
                PROJECT IDENTIFICATION
                     REG}    EST   PROJECT
  BUDGET     COMPL   COMPL  COMPL ASSESS- MEDIA
(THOUSANDS)  STATUS  DATE   DATE  MENT    TYPE
                                                                     USDA-26
  ADEQUACY OF PROJECT
ENGIN-
EERING    TIME      COST
CA-122307628 PROJECT: 0502000005
ASBESTOS-CEMENT SHINGLE REMOVAL, VARIOUS SITES
ACCT: 27 SWA FUND TSCA
CLEVELAND NF
SAN DIEGO                        CA

CA-122307631 PROJECT: 0504510003
REMEDIATION OF RADON IN PERM. RES. LEE VINING
ACCT: 27 SWA FUND TSCA
INYO N.F.
BISHOP                           CA

CA-122307633 PROJECT: 0505510002
O'NEIL CAMPGROUND WATER SYSTEM
ACCT: 25 SWA FUND SDWA
KLAMATH NF
YREKA                            CA

CA-122307633 PROJECT: 0505570001
GRASS LAKE WATER SYSTEM
ACCT: 25 SWA FUND SDWA
KLAMATH NF
YREKA                            CA

CA-122307635 PROJECT: 05065S5119
CRATER LAKE CAMPGROUND WELL
ACCT: 25 SWA FUND SDWA
LASSEN NF
SUSANVILLE                       CA

CA-1Z2307635 PROJECT: 0506515110
BATTLE CREEK CAMPGROUND WATER SUPPLY
ACCT: 25 SWA FUND SDWA
LASSEN NF
SUSANVILLE                       CA
       20.0  ESRO   90/09  90/09 MEDIUM   TOXIC    ADEQUATE  ADEQUATE   ADEQUATE
                                        SUBSTANCE    DESIGN    TIMING    ESTIMATE
        2.0  ESDF   90/09  90/12   HIGH      AIR     ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
        5.0  INOV   91/09  90/12   HIGH    DRINKING  ADEQUATE  ADEQUATE   ADEQUATE
                                         WATER     DESIGN    TIMING    ESTIMATE
       24.5  ESRO   91/09  90/12  MEDIUM  DRINKING  ADEQUATE  ADEQUATE   ADEQUATE
                                         WATER     DESIGN    TIMING    ESTIMATE
       20.0  ESDP   S6/12   90/12  HIGH   DRINKING  ADEQUATE  ADEQUATE   ADEQUATE
                                         WATER     DESIGN    TIMING    ESTIMATE
       60.0  ESDP   86/12   90/12  HIGH   DRINKING  ADEQUATE  ADEQUATE   ADEQUATE
                                         WATER     DESIGN    TIMING    ESTIMATE

-------
                                  FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                          DEPARTMENT OF AGRICULTURE               FOREST SERVICE
                 PROJECT IDENTIFICATION
                     REQ    EST   PROJECT
  BUDGET     COMPL    COMPL  COMPL ASSESS- MEDIA
(THOUSANDS)   STATUS   DATE   DATE  MENT    TYPE
                                                                                                                      USDA-27
  ADEQUACY OF PROJECT
ENGIN-
EERING    TIME      COST
 CA-122307635 PROJECT:  0506515306
 SURNSEY CREEK CAMPGROUND WATER  SYSTEM
 ACCT:  25 SWA FUND SDWA
 LASSEN NF
 SUSANVILLE                        CA

 CA-122307635 PROJECT:  0506585880
 EAGLE  LAKE  WATER  DIST.  SYSTEM REPLACEMENT
 ACCT:  25 SWA FUND SDWA
 LASSEN NF
 SUSANVILLE                        CA

 CA-122307635 PROJECT:  0506530003
 REMOVAL  OF  ASBESTOS SIDING FROM  RESIDENCES
 ACCT:  27 SWA FUND  TSCA
 LASSEN NF
 SUSANVILLE                        CA
       85.0   ESDP   86/12  90/12  HIGH   DRINKING  ADEQUATE  ADEQUATE   ADEQUATE
                                         WATER     DESIGN    TIMING    ESTIMATE
       80.0   ESDF    91/09  90/12 MEDIUM  DRINKING  ADEQUATE  ADEQUATE   ADEQUATE
                                         WATER     DESIGN    TIMING    ESTIMATE
       70.0   ESDP   91/09  90/09  HIGH    TOXIC    ADEQUATE  ADEQUATE   ADEQUATE
                                       SUBSTANCE   DESIGN    TIMING    ESTIMATE
CA-122307635 PROJECT: 0506530002
LEAKING CG TOILET VAULTS ON HAT CREEK DIST.
ACCT: 23 SWA FUND CWA-PS
LASSEN NF
SUSANVILLE                       CA

CA-122307635 PROJECT: 0506510001
LEAKING CG TOILET VAULTS ON ALMANOR DISTRICT
ACCT: 23 SWA FUND CWA-PS
LASSEN NF
SUSANVILLE                       CA

CA-122307636 PROJECT: 0507000105
FOREST ASBESTOS SIDING REMOVAL
ACCT: 27 SWA FUND TSCA
LOS PADRES NF
GOLETA                           CA
      48.0  ESDP   87/12  90/12  HIGH    WATER
     139.0  ESDP   87/12  90/09  HIGH    WATER
                                                  ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
                                                  ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
     450.0  ESRO   91/09  90/12 MEDIUM   TOXIC    ADEQUATE  ADEQUATE   ADEQUATE
                                       SUBSTANCE   DESIGN    TIMING    ESTIMATE

-------
                                 FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                         DEPARTMENT OF AGRICULTURE               FOREST SERVICE
                PROJECT IDENTIFICATION
                     REQ    EST   PROJECT
  BUDGET     COMPL   COMPL  COMPL ASSESS- MEDIA
(THOUSANDS)  STATUS  DATE   DATE  MENT    TYPE
                                                                     USDA-28
             ADEQUACY OF PROJECT
           ENGIN-
           EERING    TIME      COST
CA-122307636 PROJECT: 050700000*
ABANDONED ROADS AND TRAILS
ACCT: 2* SWA FUND CWA-NPS
LOS PADRES NF
GOLETA                           CA

CA-122307637 PROJECT: 05080*0016
FOREST-WIDE UPGRADING EXIST.POT.WATER SYSTEM
ACCT: 35 OTHER FUNDS SDWA
MENDOCINO NF
WILLOWS                          CA

CA-122307637 PROJECT: 0508030017
DEVELOP NEW POTABLE WATER SOURCE
ACCT: 35 OTHER FUNDS SDWA
MENDOCINO NF
WILLOWS                          CA

CA-122307637 PROJECT: 0508030031
STONYFORD WORK CENTER WASH RACK
ACCT: 11 DEPT FUND CERCLA
MENDOCINO NF
WILLOWS                          CA

CA-122307637 PROJECT: 0508030013
INVESTIGATE OLD LANDFILL
ACCT: 11 DEPT FUND CERCLA
MENDOCINO NF
WILLOWS                          CA

CA-122307637 PROJECT: 050803001*
INVESTIGATE OLD LANDFILL
ACCT: 11 DEPT FUND CERCLA
MENDOCINO NF
WILLOWS                          CA
      180.0  ESDP   86/10  90/12  HIGH     WATER     ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
       22.0  OTHR   86/12  90/09 MEDIUM  DRINKING  ADEQUATE  ADEQUATE   ADEQUATE
                                          MATER     DESIGN    TIMING    ESTIMATE
       20.0  OTHR   86/12  90/09 MEDIUM   DRINKING  ADEQUATE  ADEQUATE   ADEQUATE
                                         WATER     DESIGN    TIMING    ESTIMATE
       10.0  ESDP   86/10   92/09   HIGH
       50.0  ESDP   86/10   90/09  HIGH
                                         CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
          DESIGN    TIMING    ESTIMATE
       50.0  ESDP   86/10   90/09  HIGH    CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE

-------
                                  FEDERAL  AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                          DEPARTMENT OF  AGRICULTURE               FOREST SERVICE
                 PROJECT IDENTIFICATION
                    REQ    EST   PROJECT
  BUDGET     COMPL   COMPL  COMPL ASSESS- MEDIA
(THOUSANDS)   STATUS  DATE   DATE  MENT    TYPE
                                                                                                                     USDA-29
             ADEQUACY OF PROJECT
           ENGIN-
           EERING    TIME      COST
 CA-122307637 PROJECT:  0508030015
 INVESTIGATE OLD LANDFILL
 ACCT:  11 DEPT FUND CERCLA
 MENDOCINO NF
 WILLOWS                          CA

 CA-122307637 PROJECT:  0508040008
 INVESTIGATE OLD LANDFILL
 ACCT:  11 DEPT FUND CERCLA
 MENDOCINO NF
 WILLOWS                          CA

 CA-122307637 PROJECT:  0508040006
 INVESTIGATE OLD LANDFILL
 ACCT:  11  DEPT FUND CERCLA
 MENDOCINO NF
 WILLOWS                          CA

 CA-122307637 PROJECT:  0508040007
 INVESTIGATE  OLD  LANDFILL
 ACCT:  11  DEPT FUND  CERCLA
 MENDOCINO NF
 WILLOWS                          CA

 CA-122307637  PROJECT:  0508040034
 UPPER  LAKE  A.S.  -WASH  RACK
 ACCT:  11  DEPT  FUND  CERCLA
 MENDOCINO NF
 WILLOWS                          CA

 CA-122307637  PROJECT:  0508040037
 INVESTIGATE OLD  LANDFILL
 ACCT:  11 DEPT  FUND CERCLA
MENDOCINO NF
WILLOWS                          CA
                                                       50.0  ESDP   86/10  90/09  HIGH
       50.0   ESDP   86/10  90/09  HIGH
                                         CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
          DESIGN    TIMING    ESTIMATE
       50.0   ESDP   86/10  90/09  HIGH    CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
       50.0   ESDP   86/10  90/09  HIGH
       10.0   ESDP   86/10  92/09  HIGH
                                         CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
                                         CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
      50.0  ESDP   86/10  90/09  HIGH    CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE

-------
                                 FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR  FISCAL YEAR  1991

                         DEPARTMENT OF AGRICULTURE               FOREST SERVICE
                PROJECT IDENTIFICATION
                     REQ    EST   PROJECT
  BUDGET     COMPL   COMPL  COMPL ASSESS-  MEDIA
(THOUSANDS)  STATUS  DATE   DATE   MENT     TYPE
                                                                                                                     USDA-30
  ADEQUACY OF PROJECT
ENGIN-
EERING    TIME      COST
CA-122307637 PROJECT: 0508040038
INVESTIGATE OLD LANDFILL
ACCT: 11 DEPT FUND CERCLA
MENDOCINO NF
WILLOWS                          CA

CA-122307637 PROJECT: 0508060001
INVESTIGATE OLD LANDFILL
ACCT: 11 DEPT FUND CERCLA
MENDOCINO NF
WILLOWS                          CA

CA-122307637 PROJECT: 0508060002
INVESTIGATE OLD LANDFILL
ACCT: 11 DEPT FUND CERCLA
MENDOCINO NF
WILLOWS                          CA

CA-122307637 PROJECT: 0508060003
INVESTIGATE OLD LANDFILL
ACCT: 11 DEPT FUND CERCLA
MENDOCINO NF
WILLOWS                          CA

CA-122307637 PROJECT: 0508060004
INVESTIGATE OLD LANDFILL
ACCT: 11 DEPT FUND CERCLA
MENDOCINO NF
WILLOWS                          CA

CA-122307637 PROJECT: 0508030009
INVESTIGATE OLD LANDFILL
ACCT: 11 DEPT FUND CERCLA
MENDOCINO NF
WILLOWS                          CA
       50.0  ESDP   86/10   90/09  HIGH     CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
       50.0  ESDP   86/10   90/09   HIGH    CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
       50.0  ESDP   86/10  90/09  HIGH    CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
       50.0  ESDP   86/10  90/09  HIGH    CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
       50.0  ESDP   86/10   90/09   HIGH
       50.0  ESDP   86/10   90/09  HIGH
                                         CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
                                         CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE

-------
                                  FEDERAL AGENCY POLLUTION  ABATEMENT PLAN FOR FISCAL YEAR 1991

                          DEPARTMENT OF AGRICULTURE               FOREST SERVICE
                 PROJECT IDENTIFICATION
                    REQ    EST   PROJECT
  BUDGET     COMPL   COMPL  COMPL ASSESS- MEDIA
(THOUSANDS)   STATUS  DATE   DATE  MENT    TYPE
                                                                                                                      USDA-31
             ADEQUACY OF PROJECT
           ENGIN-
           EERING    TIME      COST
 CA-122307637 PROJECT: 0508030010
 INVESTIGATE OLD LANDFILL
 ACCT: 11 DEPT FUND CERCLA
 MENDOCINO NF
 WILLOWS                          CA

 CA-122307637 PROJECT: 0508030011
 INVESTIGATE OLD LANDFILL
 ACCT: 11 DEPT FUND CERCLA
 MENDOCINO NF
 WILLOWS                          CA

 CA-122307637 PROJECT: 0508010026
 GOVT.  SPRINGS CISTERN REMOVAL  PROJECT
 ACCT:  11 DEPT FUND CERCLA
 MENDOCINO NF
 WILLOWS                           CA

 CA-122307637 PROJECT:  0508060035
 EEL RIVER WORK  CENTER- WASH RACK
 ACCT:  11  DEPT FUND CERCLA
 MENDOCINO NF
 WILLOWS                           CA

 CA-122307637  PROJECT: 0508030012
 INVESTIGATE OLD LANDFILL
 ACCT:  11  DEPT FUND  CERCLA
 MENDOCINO  NF
 WILLOWS                          CA

 CA-122307637  PROJECT: 0508030028
 STONYFORD WORK CENTER- ASBESTOS SIDING REMOVAL
 ACCT: 27 SWA FUND TSCA
MENDOCINO NF
WILLOWS                          CA
       50.0   ESDP   86/10  90/09  HIGH
       50.0   ESDF   91/09  90/09  HIGH
CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
          DESIGN    TIMING    ESTIMATE
CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
          DESIGN    TIMING    ESTIMATE
       25.0  ESDF   86/10  91/09 MEDIUM   CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
       4.0  ESDF   86/10  92/09 MEDIUM   CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
      50.0  ESDF   86/10  90/09 MEDIUM   CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
       6.0  ESRO   91/09  90/12 MEDIUM   TOXIC    ADEQUATE  ADEQUATE   ADEQUATE
                                       SUBSTANCE   DESIGN    TIMING    ESTIMATE

-------
                                 FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                         DEPARTMENT OF AGRICULTURE               FOREST SERVICE
                PROJECT IDENTIFICATION
                     REQ    EST   PROJECT
  BUDGET     COMPL   COMPL  COMPL ASSESS- MEDIA
(THOUSANDS)  STATUS  DATE   DATE  MENT    TYPE
                                                                     USDA-32
  ADEQUACY OF PROJECT
ENGIN-
EERING    TIME      COST
CA-122307637 PROJECT: 0508030019
STONYFORD WORK CENTER SEWAGE SYSTEM REPLACEMENT
ACCT: 23 SWA FUND CWA-PS
MENDOCINO NF
WILLOWS                          CA

CA-122307637 PROJECT: 0508060018
COVELO A.S. SEWAGE SYSTEM REPLACEMENT
ACCT: 23 SWA FUND CWA-PS
MENDOCINO NF
WILLOWS                          CA

CA-122307637 PROJECT: 0508060*02
MENDOCINO PASS GULLY CONTROL
ACCT: 34 OTHER FUNDS CWA-NPS
MENDOCINO NF
WILLOWS                          CA

CA-122307637 PROJECT: 0508040022
BEAR CREEK CG VAULT TOILET REPLACEMENT
ACCT: 33 OTHER FUNDS CWA-PS
MENDOCINO NF
WILLOWS                          CA

CA-122307638 PROJECT: 0509530001
BUCK CREEK WATER SYSTEM
ACCT: 25 SWA FUND SDWA
MODOC NF
ALTURAS                          CA

CA-122307638 PROJECT: 0509000001
ALTURAS AUTO SHOP HAZARDOUS MATERIAL CONTAINMEN
ACCT: 12 DEPT FUND RCRA
MODOC NF
ALTURAS                          CA
        6.0  ESDP   87/12  90/09  HIGH    WATER     ADEQUATE  ADEQUATE   ADEQUATE
                                                    DESIGN    TIMING    ESTIMATE
       10.0  ESDP   87/12  91/09  HIGH    WATER    ADEQUATE  ADEQUATE   ADEQUATE
                                                    DESIGN    TIMING    ESTIMATE
       22.0  ESDF   87/12  90/12  MEDIUM   WATER    ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
       28.0  OTHR   87/12  91/01  MEDIUM    HATER    ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
       10.0  ESRO   91/09  90/12  MEDIUM  DRINKING  ADEQUATE  ADEQUATE   ADEQUATE
                                         HATER     DESIGN    TIMING    ESTIMATE
       80.0  ESDF   86/10   91/12  MEDIUM   CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE

-------
                                  FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                          DEPARTMENT OF AGRICULTURE               FOREST SERVICE
                 PROJECT IDENTIFICATION
                     REQ    EST   PROJECT
  BUDGET     COMPL    COMPL  COMPL ASSESS- MEDIA
(THOUSANDS)   STATUS   DATE   DATE  MENT    TYPE
                                                                                                                      USDA-33
  ADEQUACY OF PROJECT
ENGIN-
EERING    TIME      COST
 CA-122307638 PROJECT: 0509000000
 ASBESTOS REMOVAL-FOREST-WIDE
 ACCT: 27 SWA FUND TSCA
 MODOC NF
 ALTURAS                          CA

 CA-122307638 PROJECT: 0509540000
 FOREST-WIDE VEHICLE WASH FACILITIES
 ACCT: 23 SWA FUND CWA-PS
 MODOC NF
 ALTURAS                          CA

 CA-122307638 PROJECT:  0509560000
 TULELAKE LIFT STA.  -REPLACE  EXIS. OUTDATED SYST
 ACCT:  23 SWA FUND CWA-PS
 MODOC NF
 ALTURAS                          CA

 CA-122307639 PROJECT:  0511530001
 BLACKROCK PICNIC  AREA
 ACCT:  25 SWA FUND  SDWA
 PLUMAS  NF
 QUINCY                            CA

 CA-122307639  PROJECT: 0511530002
 BURNT RIDGE  CAMPGROUND WATER SUPPLY
 ACCT: 25 SWA  FUND SDWA
 PLUMAS NF
 qUINCY                            CA

 CA-122307639  PROJECT: 0511510000
 GRASSHOPPER/GRIZZLY CG WATER SYSTEM
ACCT: 25 SWA  FUND SDWA
 PLUMAS NF
qUINCY                            CA
      126.0   PSDF    91/09  90/09 MEDIUM   TOXIC    ADEQUATE  ADEQUATE   ADEQUATE
                                       SUBSTANCE   DESIGN    TIMING    ESTIMATE
      200.0   ESRO    91/09  90/09 MEDIUM   WATER    ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
       12.0   ESRO   90/09  90/10 MEDIUM   WATER    ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
       4.0   ESDP   86/12  90/12  HIGH   DRINKING  ADEQUATE  ADEQUATE   ADEQUATE
                                         WATER     DESIGN    TIMING    ESTIMATE
       3.0  ESDP   86/12  90/12  HIGH   DRINKING  ADEQUATE  ADEQUATE   ADEQUATE
                                         WATER     DESIGN    TIMING    ESTIMATE
       5.0  ESDF   86/12  90/12 MEDIUM  DRINKING  ADEQUATE  ADEQUATE   ADEQUATE
                                         WATER     DESIGN    TIMING    ESTIMATE

-------
                                 FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                         DEPARTMENT OF AGRICULTURE               FOREST SERVICE
                PROJECT IDENTIFICATION
                     REQ    EST   PROJECT
  BUDGET     COMPL   COMPL  COMPL ASSESS- MEDIA
(THOUSANDS)  STATUS  DATE    DATE   MENT     TYPE
                                                                     USDA-
    ADEQUACY OF PROJECT
  ENGIN-
  EERING    TIME      COST
CA-122307639 PROJECT: 0511530000
BELLVUE MINE EROSION
ACCT: 11 DEPT FUND CERCLA
PLUMAS NF
QUINCY                           CA

CA-122307639 PROJECT: 0511530006
LAPORTE QUARRY DIGGINGS
ACCT: 11 DEPT FUND CERCLA
PLUMAS NF
QUINCY                           CA

CA-122307639 PROJECT: 0511560002
GOPHER HILL LANDFILL
ACCT: 12 DEPT FUND RCRA
PLUMAS NF
QUINCY                           CA

CA-122307639 PROJECT: 0511000004
FOREST-WIDE PESTICIDE STORAGE
ACCT: 12 DEPT FUND RCRA
PLUMAS NF
qUINCY                           CA

CA-122307639 PROJECT: 0511530016
WYANDOTTE C.G. WASTE WATER EFFLUENT
ACCT: 23 SWA FUND CWA-PS
PLUMAS NF
qUINCY                           CA

CA-122307639 PROJECT: 0511550000
COTTONWOOD CG  SANITATION SYSTEM
ACCT: 23 SWA FUND CWA-PS
PLUMAS NF
QUINCY                           CA
       25.0  ESDP   66/10  90/09  HIGH    CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
       20.0  ESDP   66/10  90/09   HIGH    CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
      120.0  ESDP   66/10   90/09   HIGH    SOLID    ADEQUATE  ADEQUATE   ADEQUATE
                                         WASTE     DESIGN    TIMING    ESTIMATE
      177.0  ESDF   91/09  90/12 MEDIUM   SOLID    ADEqUATE  ADEQUATE   ADEQUATE
                                         WASTE     DESIGN    TIMING    ESTIMATE
       26.0  ESDP   91/09   90/12  HIGH    WATER
      118.0  ESDP   87/12   90/09  HIGH    WATER
                                                  ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
ADEQUATE  ADEQUATE   ADEQUATE
 DESIGN    TIMING    ESTIMATE

-------
                                  FEDERAL AGENCY  POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                          DEPARTMENT OF  AGRICULTURE               FOREST SERVICE
                 PROJECT IDENTIFICATION
                     REQ     EST    PROJECT
  BUDGET     COMPL   COMPL   COMPL  ASSESS- MEDIA
(THOUSANDS)   STATUS   DATE    DATE   MENT    TYPE
                                                                                                                      USDA-35
    ADEQUACY OF PROJECT
  ENGIN-
  EERING    TIME      COST
 CA-122307639 PROJECT: 0511530004
 DAN BEBEE CG VAULT TOILETS & SANITATION SYSTEM
 ACCT: 23 SWA FUND CWA-PS
 PLUMAS NF
 OUINCY                           CA

 CA-122307639 PROJECT: 0511530008
 MILSAP BAR CG VAULT TOILETS
 ACCT: 23 SWA FUND CWA-PS
 PLUMAS NF
 QUINCY                           CA

 CA-122307639 PROJECT:  0511530007
 LITTLE BEAVER CAMPGROUND SANITARY
 ACCT:  24 SWA FUND CWA-NPS
 PLUMAS NF
 QUINCY                           CA

 CA-122307640 PROJECT:  0512020013
 BIG BEAR  RANGER STA.  STORAGE BUILDING
 ACCT:  12  DEPT FUND  RCRA
 SAN BERNARDINO NF
 1824  SO COMMERCENTER CIRCLE       CA

 CA-122307641  PROJECT:  0513540008
 MIRACLE HOT  SPRINGS-LEAKING UST-INVEST./CLEAN-U
 ACCT:  12  DEPT FUND  RCRA
 SEQUOIA NF
 POTTERVILLE                      CA

CA-122307641 PROJECT:  0513540002
CEDAR CREEK CG PIT TOILET REPLACEMENT
ACCT: 23 SWA FUND CWA-PS
SEQUOIA NF
POTTERVILLE                      CA
                                                       22.0  ESDP   87/12  90/12  HIGH    WATER
       20.0   ESDP   87/12  90/12  HIGH    WATER
       30.0   ESDF    92/09  91/12  HIGH    WATER
      40.0   ESDF   90/09  90/09 MEDIUM   SOLID
                                         WASTE
      30.0  INOV
                          90/09  HIGH
      62.5  ESDP   87/12  90/12  HIGH
                                         SOLID
                                         WASTE
                                         WATER
                                                  ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
                                                  ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
                                                  ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
ADEQUATE  ADEQUATE   ADEQUATE
 DESIGN    TIMING    ESTIMATE
ADEQUATE  ADEQUATE   ADEQUATE
 DESIGN    TIMING    ESTIMATE
                                                  ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE

-------
                                 FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                         DEPARTMENT OF AGRICULTURE               FOREST SERVICE
                PROJECT IDENTIFICATION
                     REQ    EST   PROJECT
  BUDGET     COMPL   COMPL  COMPL ASSESS- MEDIA
(THOUSANDS)  STATUS  DATE   DATE  MENT    TYPE
                                                                     USDA-36
  ADEQUACY OF PROJECT
ENGIN-
EERING    TIME      COST
CA-122307641 PROJECT: 0513560004
TROY MEADOW CG-LEAKING VAULT TOILET REPLACE.
ACCT: 23 SWA FUND CWA-PS
SEQUOIA NF
POTTERVILLE                      CA

CA-122307641 PROJECT: 0513560005
HOUSE MEADOW CG-LEAKING VAULT TOILET REPLACE
ACCT: 23 SWA FUND CWA-PS
SEQUOIA NF
POTTERVILLE                      CA

CA-122307642 PROJECT: 0514590013
BRADLEY LOOKOUT, ASBESTOS REMOVAL
ACCT: 27 SWA FUND TSCA
SHASTA TRINITY NF
REDDING                          CA

CA-122307642 PROJECT: 0514520015
HAYFORK ASBESTOS SIDING REMOVAL
ACCT: 27 SKA FUND TSCA
SHASTA TRINITY NF
REDDING                          CA

CA-122307642 PROJECT: 0514560014
WEAVERVILLE ASBESTOS REMOVAL
ACCT: 27 SWA FUND TSCA
SHASTA TRINITY NF
REDDING                          CA

CA-122307642 PROJECT: 0514590012
MT SHASTA ASBESTOS REMOVAL
ACCT: 27 SWA FUND TSCA
SHASTA TRINITY NF
REDDING                          CA
       62.5  ESDP   87/12  90/12   HIGH     WATER    ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
       62.5  ESDP   87/12   90/12   HIGH    WATER    ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
        5.0  PSDF   90/09  90/09  MEDIUM   TOXIC    ADEQUATE  ADEQUATE   ADEQUATE
                                        SUBSTANCE   DESIGN    TIMING    ESTIMATE
       20.0  ESRO   90/09   90/09  MEDIUM   TOXIC    ADEQUATE  ADEQUATE   ADEQUATE
                                       SUBSTANCE   DESIGN    TIMING    ESTIMATE
       10.0  ESRO   90/09   90/09 MEDIUM   TOXIC    ADEQUATE  ADEQUATE   ADEQUATE
                                       SUBSTANCE   DESIGN    TIMING    ESTIMATE
       50.0  ESRO   90/09   90/09 MEDIUM   TOXIC    ADEQUATE  ADEQUATE   ADEQUATE
                                       SUBSTANCE   DESIGN    TIMING    ESTIMATE

-------
                                  FEDERAL AGENCY  POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                          DEPARTMENT OF AGRICULTURE               FOREST SERVICE
                 PROJECT IDENTIFICATION
                    REQ    EST   PROJECT
  BUDGET     COMPL   COMPL  COMPL ASSESS- MEDIA
(THOUSANDS)   STATUS  DATE   DATE  MENT    TYPE
                                                                                                                      USDA-37
  ADEQUACY OF PROJECT
ENGIN-
EERING    TIME      COST
 CA-122307646 PROJECT: 0517530002
 RAMSHORN CAMPGROUND POTABLE WATER DISTRIB  SYSTE
 ACCT: 25 SWA FUND SDWA
 TAHOE NF
 NEVADA CITY                      CA

 CA-122307646 PROJECT: 0517540012
 FORESTHILL HAZMAT STORAGE BLDG
 ACCT: 12 DEPT FUND RCRA
 TAHOE NF
 NEVADA CITY                      CA

 CA-122307646 PROJECT: 0517540013
 FRENCH MEADOWS HAZMAT STORAGE  BUILDING
 ACCT:  12 DEPT FUND RCRA
 TAHOE NF
 NEVADA CITY                      CA

 CA-122307646 PROJECT:  0517540005
 BLUE  CANYON FUEL  TANK REMOVAL
 ACCT:  12  DEPT FUND  RCRA
 TAHOE  NF
 NEVADA CITY                      CA

 CA-122307646  PROJECT:  0519000033
 KING'S  BEACH  LANDFILL
 ACCT:  12  DEPT FUND RCRA
 TAHOE  NF
 NEVADA  CITY                      CA

 CA-122307646  PROJECT:  0517540007
 REMOVAL OF ASBESTOS FROM FOREST FACILITY
ACCT:  27 SWA  FUND TSCA
TAHOE NF
NEVADA CITY                      CA
       22.0   INOV    91/09  90/12  HIGH   DRINKING  ADEQUATE  ADEQUATE   ADEQUATE
                                         WATER     DESIGN    TIMING    ESTIMATE
       30.0   ESDF   91/09  90/12 MEDIUM PESTICIDES ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
       30.0   ESDF   91/09  90/12 MEDIUM PESTICIDES ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
        5.0   ESDP   90/09  90/09  HIGH    SOLID    ADEQUATE  ADEQUATE   ADEQUATE
                                         WASTE     DESIGN    TIMING    ESTIMATE
       5.0  ESDF   93/10  91/09 MEDIUM   SOLID    ADEQUATE  ADEQUATE   ADEQUATE
                                         WASTE     DESIGN    TIMING    ESTIMATE
      30.0  ESDP   90/09  90/09  HIGH    TOXIC    ADEQUATE  ADEQUATE   ADEQUATE
                                       SUBSTANCE   DESIGN    TIMING    ESTIMATE

-------
                                 FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                         DEPARTMENT OF AGRICULTURE               FOREST SERVICE
                PROJECT IDENTIFICATION
                     REQ    EST   PROJECT
  BUDGET     COMPL   COMPL  COMPL ASSESS- MEDIA
(THOUSANDS)   STATUS  DATE   DATE   MENT    TYPE
                                                                     USDA-38
    ADEQUACY OF PROJECT
  ENGIN-
  EERING    TIME      COST
CA-122307646 PROJECT: 0517540006
AIRCRAFT WASHDOWN FAC. 3 TAHOE AIR ATTACK BASE
ACCT: 23 SWA FUND CWA-PS
TAHOE NF
NEVADA CITY                      CA

CA-122307646 PROJECT: 0517530003
FIDDLE CREEK CAMPGROUND VAULT TOILETS.
ACCT: 23 SWA FUND CWA-PS
TAHOE NF
NEVADA CITY                      CA

CA-122307646 PROJECT: 0517530004
SARDINE CAMPGROUND VAULT TOILET
ACCT: 23 SWA FUND CWA-PS
TAHOE NF
NEVADA CITY                      CA

CA-122307646 PROJECT: 0517540003
BIG RESERVOIR CAMPGROUND TOILET VAULT
ACCT: 23 SWA FUND CWA-PS
TAHOE NF
NEVADA CITY                      CA

CA-122307646 PROJECT: 0519000003
NON-SYSTEM ROADS AND TRAILS
ACCT: 24 SWA FUND CWA-NPS
TAHOE NF
NEVADA CITY                      CA

CA-122307646 PROJECT: 0519000004
AKSORA RIDGE ROAD AND PARKING
ACCT: 24 SWA FUND CWA-NPS
TAHOE NF
NEVADA CITY                      CA
       20.0  INOV   90/09  90/09  HIGH     WATER    ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
       75.0  INOV   87/12  90/12   HIGH     WATER    ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
       35.0  INOV   87/12  90/12   HIGH    WATER    ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
       30.0  INOV   87/12   90/12   HIGH    WATER    ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
       35.0  ESDP   91/09  90/09   HIGH    WATER
       20.0  ESDP   87/12   90/12   HIGH    WATER
ADEQUATE  ADEQUATE   ADEQUATE
 DESIGN    TIMING    ESTIMATE
                                                  ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE

-------
                                  FEDERAL AGENCY POLLUTION ABATEMENT  PLAN FOR FISCAL YEAR 1991

                          DEPARTMENT OF AGRICULTURE               FOREST SERVICE
                 PROJECT IDENTIFICATION
                    REQ    EST   PROJECT
  BUDGET     COMPL   COMPL  COMPL ASSESS- MEDIA
(THOUSANDS)   STATUS  DATE   DATE  MENT    TYPE
                                                                                                                      USDA-39
    ADEQUACY OF PROJECT
  ENGIN-
  EERING    TIME      COST
 CA-122307646 PROJECT: 0519000005
 KIVA BEACH AND THE ESTATES
 ACCT: 24 SWA FUND CWA-NPS
 TAHOE NF
 NEVADA CITY                      CA

 CA-122307646 PROJECT: 0519000025
 SAWMILL POND
 ACCT: 24 SWA FUND CWA-NPS
 TAHOE NF
 NEVADA CITY                      CA

 CA-122307646 PROJECT: 0519000023
 FS  SUMMER  HOME  TRACTS,TOTAL  OF  600  PERMITS
 ACCT: 24 SWA FUND CWA-NPS
 TAHOE NF
 NEVADA CITY                      CA

 CA-122307646 PROJECT:  0519000020
 LONELY GULCH BORROW PIT
 ACCT:  24 SWA FUND  CWA-NPS
 TAHOE NF
 NEVADA CITY                      CA

 CA-122307646  PROJECT: 0519000012
 EAST  SHORE  BEACHES
 ACCT:  24 SWA  FUND CWA-NPS
 TAHOE NF
 NEVADA CITY                      CA

 CA-122307646  PROJECT: 0519000016
 MEEKS BAY CAMPGROUND
 ACCT: 24 SWA  FUND CWA-NPS
 TAHOE NF
NEVADA CITY                      CA
       42.0   ESDP    91/09  90/09  HIGH    WATER
        2.0   ESDP   92/11  91/09  HIGH    WATER
       5.0  ESDP   67/12  90/12  HIGH    WATER
       2.0  ESDP   87/12  90/12  HIGH    WATER
       5.0  ESDP   91/09  90/09  HIGH    WATER
      15.0  ESDP   87/12  90/12  HIGH    WATER
ADEQUATE  ADEQUATE   ADEQUATE
 DESIGN    TIMING    ESTIMATE
                                                  ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
                                                  ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
                                                  ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
                                                  ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
                                                  ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE

-------
                                 FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                         DEPARTMENT OF AGRICULTURE               FOREST SERVICE
                PROJECT IDENTIFICATION
                     REQ    EST   PROJECT
  BUDGET     COMPL   COMPL  COMPL ASSESS- MEDIA
(THOUSANDS)  STATUS  DATE   DATE  MENT    TYPE
                                                                     USDA-40
    ADEQUACY OF PROJECT
  ENGIN-
  EERING    TIME      COST
CA-122307646 PROJECT: 0519000019
BAYVIEW BORROW PIT
ACCT: 24 SWA FUND CWA-NPS
TAHOE NF
NEVADA CITY                      CA

CA-122307646 PROJECT: 0519000026
TROUT CREEK FILL REMOVAL
ACCT: 24 SWA FUND CWA-NPS
TAHOE NF
NEVADA CITY                      CA

CA-122307646 PROJECT: 0519000030
MEEKS CREEK WATERSHED RESTORATION
ACCT: 24 SWA FUND CWA-NPS
TAHOE NF
NEVADA CITY                      CA

CA-122307646 PROJECT: 0519000006
CAMP RICHARDSON RESORT
ACCT: 24 SWA FUND CWA-NPS
TAHOE NF
NEVADA CITY                      CA

CA-122307646 PROJECT: 0519000007
ROUNDHILL PINES RESORT & NEVADA BEACH
ACCT: 24 SWA FUND CWA-NPS
TAHOE NF
NEVADA CITY                      CA

CA-122307646 PROJECT: 0519000009
BAYVIEW CAMPGROUND/DAY USE SITE/TAILHEAD
ACCT: 24 SWA FUND CWA-NPS
TAHOE NF
NEVADA CITY                      CA
        2.0  ESDF   67/12  90/12  HIGH    WATER    ADEQUATE  ADEQUATE   ADEQUATE
                                                    DESIGN    TIMING    ESTIMATE
       10.0  ESDF   91/10  91/04 MEDIUM   WATER     ADEQUATE  ADEQUATE   ADEQUATE
                                                    DESIGN    TIMING    ESTIMATE
        5.0  ESDF   92/10  91/09 MEDIUM   WATER
      210.0  ESDF   91/09  90/09  HIGH     WATER
       25.0  ESDF   91/09   90/12   HIGH    WATER
        5.0   ESDF    91/09   90/12  HIGH    WATER
                                                  ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
ADEQUATE  ADEQUATE   ADEQUATE
 DESIGN    TIMING    ESTIMATE
ADEQUATE  ADEQUATE   ADEQUATE
 DESIGN    TIMING    ESTIMATE
ADEQUATE  ADEQUATE   ADEQUATE
 DESIGN    TIMING    ESTIMATE

-------
                                  FEDERAL AGENCY  POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                          DEPARTMENT OF  AGRICULTURE               FOREST SERVICE
                 PROJECT IDENTIFICATION
                    REQ    EST   PROJECT
  BUDGET     COMPL   COMPL  COMPL ASSESS- MEDIA
(THOUSANDS)   STATUS  DATE   DATE  MENT    TYPE
                                                                                                                     USDA-41
    ADEQUACY OF PROJECT
  ENGIN-
  EERING    TIME      COST
 CA-122307646 PROJECT:  0519000010
 WEST SHORE RECREATION  SITES
 ACCT: 24 SWA FUND CWA-NPS
 TAHOE NF
 NEVADA CITY                      CA

 CA-122307646 PROJECT:  0519000011
 BALDWIN ADMINISTRATIVE SITE
 ACCT: 24 SWA FUND CWA-NPS
 TAHOE NF
 NEVADA CITY                      CA

 CA-122307646 PROJECT:  0519000001
 ZEPHYR COVE RESORT
 ACCT:  24 SWA FUND CWA-NPS
 TAHOE NF
 NEVADA CITY                      CA

 CA-122307646 PROJECT:  0519000002
 BLACKWOOD  CREEK WATERSHED
 ACCT:  24 SWA FUND  CWA-NPS
 TAHOE  NF
 NEVADA  CITY                       CA

 CA-122307646  PROJECT:  0519000022
 MEISS MEADOWS RESTORATION PROJECT
 ACCT:  24 SWA  FUND  CWA-NPS
 TAHOE NF
 NEVADA CITY                      CA

CA-122312952 PROJECT:  2700000003
ASBESTOS REMOVAL
ACCT: 27 SWA FUND TSCA
 PSW, ARS WEST ANNEX BUILDING
ALBANY                           CA
             ESDF   91/09  90/12  HIGH    WATER
       55.0   ESDF   91/09  90/12  HIGH    WATER
ADEQUATE  ADEQUATE   ADEQUATE
 DESIGN    TIMING    ESTIMATE
ADEQUATE  ADEQUATE   ADEQUATE
 DESIGN    TIMING    ESTIMATE
       30.0   ESDF   91/09  90/09  HIGH    WATER    ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
       40.0   ESDF   91/09  90/09 MEDIUM   WATER    ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
       10.0  OTHR   67/12  90/12  HIGH    WATER    ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
      85.0  INOV
                          90/09  HIGH    TOXIC    ADEQUATE  ADEQUATE   ADEQUATE
                                       SUBSTANCE   DESIGN    TIMING    ESTIMATE

-------
                                 FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                         DEPARTMENT OF AGRICULTURE               FOREST SERVICE
                PROJECT IDENTIFICATION
                     REQ    EST   PROJECT
  BUDGET     COMPL   COMPL  COMPL ASSESS- MEDIA
(THOUSANDS)  STATUS  DATE   DATE   MENT     TYPE
                                                                     USDA-42
                            ADEQUACY OF PROJECT
                          ENGIN-
                          EERING    TIME      COST
CO-122300001 PROJECT: 0213000019
PAGOSA W * S DISTRICT USFS DUMPSTATION
ACCT: 23 SWA FUND CWA-PS
SAN JUAN NF
DURANGO                          CO

CO-122300001 PROJECT: 0213000034
DUNTON GS-REPLACE SEWAGE DISPOSAL SYSTEM
ACCT: 23 SWA FUND CWA-PS
SAN JUAN NF
DURANGO                          CO

CO-122307519 PROJECT: 0204000001
SLUMGULLION CG - DRILL NEW WELL
ACCT: 25 SWA FUND SDWA
GRAND,MESA, UNC. ft GUNN. NF'S
DELTA                            CO

CO-122307519 PROJECT: 0204000003
WEST MUDDY CREEK GS NEW SPRING DEVELOPMENT
ACCT: 25 SWA FUND SDWA
GRAND MESA, UNC. ft GUNN. NF'S
DELTA                            CO

CO-122307519 PROJECT: 0204000004
LOST LAKE CG DEVELOP NEW SOURCE
ACCT: 25 SWA FUND SDWA
GRAND MESA, UNC. ft GUNN. NF'S
DELTA                            CO

CO-122307519 PROJECT: 0204000005
SNOWBLIND CG NEW SPRING DEVELOPMENT
ACCT: 25 SWA FUND SDWA
GRAND MESA, UNC. ft GUNN. NF'S
DELTA                            CO
        2.0  ESRO
        2.0  ESRO
91/05 MEDIUM   WATER    ADEQUATE   ADEQUATE    ADEQUATE
                         DESIGN    TIMING    ESTIMATE
                           91/05  MEDIUM   WATER    ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
       13.0  ESDP   86/12   90/09   HIGH    DRINKING  ADEQUATE  ADEQUATE   ADEQUATE
                                         WATER     DESIGN    TIMING    ESTIMATE
       16.0   ESDP   89/04  90/09   HIGH   DRINKING    NOT       NOT        NOT
                                         WATER     AVAIL     AVAIL      AVAIL
       18.0   ESDP   89/04   90/09  HIGH   DRINKING    NOT       NOT        NOT
                                         WATER     AVAIL     AVAIL      AVAIL
        1.0   ESDP    89/04   90/09  HIGH   DRINKING    NOT       NOT        NOT
                                         WATER     AVAIL     AVAIL      AVAIL

-------
                                  FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                          DEPARTMENT OF AGRICULTURE               FOREST SERVICE
                 PROJECT IDENTIFICATION
                    REQ    EST   PROJECT
  BUDGET     COMPL   COMPL  COMPL ASSESS- MEDIA
(THOUSANDS)   STATUS  DATE   DATE  MENT    TYPE
                                                                                                                     USDA-43
  ADEQUACY OF PROJECT
ENGIN-
EERING    TIME      COST
 CO-122307519 PROJECT:  0204000007
 SOAP CREEK CG
 ACCT: 25 SWA FUND SDWA
 GRAND MESA, UNC.  t GUNN.  NF'S
 DELTA                            CO

 CO-122307519 PROJECT:  0204000009
 BUZZARD CR OCC SITE-REDEVELOP SPRING
 ACCT: 25 SWA FUND SDWA
 GRAND MESA, UNC.  & GUNN.  NF'S
 DELTA                            CO

 CO-122307519 PROJECT:  0204000010
 GLACIER SPRING PG-NEW  SPRG DEVEL & DIST SYS
 ACCT:  25 SWA FUND SDWA
 GRAND MESA,  UNC.  & GUNN.  NF'S
 DELTA                            CO

 CO-122307519 PROJECT:  0204000011
 BIG BLUE  CG
 ACCT:  25  SWA FUND  SDWA
 GRAND  MESA,  UNC.  t GUNN.  NF'S
 DELTA                             CO

 CO-122307519 PROJECT:  0204000012
 OLD AGENCY  W.C.
 ACCT:  25  SWA FUND  SDWA
 GRAND MESA,  UNC.  &  GUNN. NF'S
 DELTA                            CO

 CO-122307519  PROJECT:  0204000008
 COLUMBINE PG-REPLACE HANDPUMP
ACCT: 25 SWA  FUND SDWA
GRAND MESA, UNC. &  GUNN. NF'S
DELTA                            CO
        2.0   ESDP   89/04  90/09  HIGH   DRINKING    NOT       NOT        NOT
                                         WATER     AVAIL     AVAIL      AVAIL
        1.0   ESDP   89/04  90/09  HIGH   DRINKING    NOT       NOT        NOT
                                         WATER     AVAIL     AVAIL      AVAIL
        2.5   ESDP   89/04  90/10  HIGH   DRINKING    NOT       NOT        NOT
                                         WATER     AVAIL     AVAIL      AVAIL
        1.5  ESDP   89/04  90/10  HIGH   DRINKING    NOT       NOT        NOT
                                         WATER     AVAIL     AVAIL      AVAIL
       2.0  ESDP   89/04  90/10  HIGH   DRINKING    NOT       NOT        NOT
                                         WATER     AVAIL     AVAIL      AVAIL
       2.5  ESRO   91/09  90/10 MEDIUM  DRINKINS    NOT       NOT        NOT
                                         WATER     AVAIL     AVAIL      AVAIL

-------
                                 FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                         DEPARTMENT OF AGRICULTURE               FOREST SERVICE
                PROJECT IDENTIFICATION
                     REQ    EST   PROJECT
  BUDGET     COMPL   COMPL  COMPL ASSESS- MEDIA
(THOUSANDS)  STATUS  DATE   DATE  MENT    TYPE
                                                                     USDA-44
                            ADEQUACY OF PROJECT
                          ENGIN-
                          EERING    TIME      COST
CO-122307526 PROJECT: 0209000002
BIG SPRINGS PG DRILL WELL
ACCT: 25 SWA FUND SDWA
RIO GRANDE NF
MONTE VISTA                      CO

CO-122307526 PROJECT: 0209000003
LUDERS CREEK CG-DRILL WELL
ACCT: 25 SWA FUND SDWA
RIO GRANDE NF
MONTE VISTA                      CO

CO-122307527 PROJECT: 0210000001
VAULT REPLACEMENT
ACCT: 23 SWA FUND CWA-PS
ARAPAHO & ROOSEVELT NF'S
FORT COLLINS                     CO

CO-122307527 PROJECT: 0200000002
REGION WIDE WATER SYSTEMS
ACCT: 25 SWA FUND SDWA
ARAPAHO * ROOSEVELT NF'S
FORT COLLINS                     CO

CO-122307527 PROJECT: 0210000002
UPPER WILLOW CREEK STABILIZATION
ACCT: 24 SWA FUND CWA-NPS
ARAPAHO & ROOSEVELT NF'S
FORT COLLINS                     CO

CO-122307527 PROJECT: 0210000003
JOHNSON CREEK STABILIZATION
ACCT: 24 SWA FUND CWA-NPS
ARAPAHO & ROOSEVELT NF'S
FORT COLLINS                     CO
        2.0  ESDP   89/04  90/09  HIGH    DRINKING    NOT       NOT        NOT
                                         WATER     AVAIL     AVAIL      AVAIL
        2.0  ESDP   89/04  91/OS  HIGH    DRINKING    NOT       NOT        NOT
                                         WATER     AVAIL     AVAIL      AVAIL
       90.0  ESDP   87/12   90/10   HIGH    WATER      NOT       NOT        NOT
                                                   AVAIL     AVAIL      AVAIL
      190.0   ESDF    91/09   90/11 MEDIUM   WATER    ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
       15.0   OTHR
       15.0   OTHR
                           90/10 MEDIUM   WATER
90/10 MEDIUM   WATER
                          NOT
                         AVAIL
                                                    NOT
                                                   AVAIL
                                                              NOT
                                                             AVAIL
                                   NOT
                                  AVAIL
 NOT
AVAIL
 NOT
AVAIL

-------
                                  FEDERAL AGENCY  POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                          DEPARTMENT OF AGRICULTURE               FOREST SERVICE
                 PROJECT IDENTIFICATION
                    REQ    EST   PROJECT
  BUDGET     COMPL   COMPL  COMPL ASSESS- MEDIA
(THOUSANDS)   STATUS  DATE   DATE  MENT    TYPE
                                                                                                                     USDA-45
   ADEQUACY OF PROJECT
 ENGIN-
 EERING    TIME      COST
 CO-122307527 PROJECT:  0210000004
 KURD CREEK EROSION AND DRAINAGE CONTROL
 ACCT: 24 SWA FUND CWA-NPS
 ARAPAHO & ROOSEVELT NF'S
 FORT COLLINS                     CO

 CO-122307527 PROJECT:  0210000005
 BEAVER MUDDY EROSION & DRAINAGE CONTROL
 ACCT: 24 SWA FUND CWA-NPS
 ARAPAHO & ROOSEVELT NF'S
 FORT COLLINS                     CO

 CO-122307527 PROJECT:  0210000006
 EATON,  CLOSE ROADS,  INSTALL  DRAINAGE,  ETC
 ACCT:  24 SWA FUND CWA-NPS
 ARAPAHO & ROOSEVELT  NF'S
 FORT COLLINS                     CO
CO-122307527  PROJECT: 0210000007
GEORGE CREEK
ACCT: 24 SWA  FUND CWA-NPS
ARAPAHO & ROOSEVELT NF'S
FORT COLLINS
CO-122307527 PROJECT: 0210000008
PANHANDLE
ACCT: 24 SWA FUND CWA-NPS
ARAPAHO & ROOSEVELT NF'S
FORT COLLINS
                                 CO
                                 CO
        0.5   OTHR
        0.7  OTHR
        0.7  OTHR
                                                        0.7  OTHR
                                                        0.6  OTHR
                                                                           90/10 MEDIUM   WATER
                          90/10 MEDIUM   WATER
                          90/10 MEDIUM   WATER
                                                                           90/10 MEDIUM   WATER
                          90/10 MEDIUM   WATER
CO-122307528 PROJECT: 02H000003
MAD CREEK WC CONSTRUCT NEW SPRING DEVELOPMENT
ACCT: 25 SWA FUND SDWA
ROUTT NF
STEAMBOAT SPRINGS                CO
                                                       15.0  ESDP   89/04  91/02  HIGH
                                        DRINKING
                                         WATER
 NOT
AVAIL
 NOT
AVAIL
                                                    NOT
                                                   AVAIL
                                                    NOT
                                                   AVAIL
                                                    NOT
                                                   AVAIL
 NOT
AVAIL
 NOT
AVAIL
 NOT
AVAIL
           NOT
          AVAIL
           NOT
          AVAIL
           NOT
          AVAIL
 NOT
AVAIL
 NOT
AVAIL
 NOT
AVAIL
            NOT
           AVAIL
            NOT
           AVAIL
            NOT
           AVAIL
 NOT
AVAIL

-------
                                 FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR  FISCAL  YEAR  1991

                         DEPARTMENT OF AGRICULTURE               FOREST SERVICE
                PROJECT IDENTIFICATION
                     REQ    EST    PROJECT
  BUDGET     COMPL   COMPL  COMPL  ASSESS- MEDIA
(THOUSANDS)  STATUS  DATE    DATE   MENT    TYPE
                                                                                                                     USDA-46
  ADEQUACY OF PROJECT
ENGIN-
EERING    TIME      COST
CO-122307528 PROJECT: 0211000001
VAULT WASTE DISPOSAL UTILITY CONTRACT
ACCT: 23 SWA FUND CWA-PS
ROUTT NF
STEAMBOAT SPRINGS                CO

CO-122307529 PROJECT: 0212000001
VAULT WASTE DUMP STA/UTILITY CONTRACTS
ACCT: 23 SWA FUND CWA-PS
PIKE & SAN ISABEL NF'S
PUEBLO                           CO

CO-122307530 PROJECT: 0213000008
SILVER FALLS GS DRILL WELL
ACCT: 25 SWA FUND SDWA
SAN JUAN NF
DURANGO                          CO

CO-122307530 PROJECT: 0213000035
ASPEN GS REPLACE WATER SYSTEM
ACCT: 25 SWA FUND SDWA
SAN JUAN NF
DURANGO                          CO

CO-122307530 PROJECT: 0213000024
SOUTH MINERAL CG WATER SYSTEM REHAB/REPLACE
ACCT: 25 SWA FUND SDWA
SAN JUAN NF
DURANGO                          CO

CO-122307530 PROJECT: 0213000017
GLADE GS-COMPLETE WELL INSTALLATION, DISTR.
ACCT: 25 SWA FUND SDWA
SAN JUAN NF
DURANGO                          CO
       70.0  ESDP   87/12   91/0*  HIGH    WATER      NOT       NOT
                                                   AVAIL     AVAIL
      210.0  ESDP   87/12   91/10   HIGH    WATER      NOT       NOT
                                                   AVAIL     AVAIL
        2.0  ESDP   89/04  91/05  HIGH   DRINKING    NOT
                                         WATER     AVAIL
          NOT
         AVAIL
        2.0  ESDP   86/12   91/05  HIGH   DRINKING    NOT       NOT
                                         WATER     AVAIL     AVAIL
        2.0  ESDP   86/12   91/05  HIGH   DRINKING    NOT       NOT
                                         WATER     AVAIL     AVAIL
        3.0  ESDP   86/12   91/05  HIGH   DRINKING    NOT       NOT
                                         WATER     AVAIL     AVAIL
                     NOT
                    AVAIL
                     NOT
                    AVAIL
 NOT
AVAIL
                     NOT
                    AVAIL
                    NOT
                   AVAIL
                    NOT
                   AVAIL

-------
                                  FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                          DEPARTMENT OF AGRICULTURE               FOREST SERVICE
                 PROJECT IDENTIFICATION
                    REG!    EST   PROJECT
  BUDGET     COMPL   COMPL  COMPL ASSESS- MEDIA
(THOUSANDS)   STATUS  DATE   DATE  MENT    TYPE
                                                                                                                      USDA-47
                            ADEQUACY  OF  PROJECT
                          ENGIN-
                          EERING    TIME     COST
 CO-122307530 PROJECT: 0213000018
 WILLIAMS CREEK CG REHAB/REPLACE DISTRIBUTION
 ACCT: 25 SWA FUND SDWA
 SAN JUAN NF
 DURANGO                          CO

 CO-122307530 PROJECT: 0213000020
 PAGOSA JOB CORPS SITE NEW DISTRIBUTION
 ACCT: 25 SWA FUND SDWA
 SAN JUAN NF
 DURANSO                          CO

 CO-122307530 PROJECT: 0213000021
 DUNTON CG WATER  SYSTEM REPLACEMENT
 ACCT:  25 SWA FUND SDWA
 SAN JUAN NF
 DURANGO                          CO

 CO-122307530 PROJECT:  0213000009
 GRAHAM CREEK CG-REPLACE DISTRIBUTION SYSTEM
 ACCT:  25 SWA FUND  SDWA
 SAN JUAN NF
 DURANGO                           CO

 CO-122307530  PROJECT:  0213000011
 RICO GS-REDEV SPRG/REHAB DIST SYS
 ACCT:  25  SWA  FUND  SDWA
 SAN JUAN  NF
 DURANGO                          CO

 CO-122307530  PROJECT:  0213000012
 TRANSFER  PARK CG&PG-REPL HANDSREHAB WELLS
 ACCT: 25  SWA  FUND  SDWA
SAN JUAN  NF
DURANGO                          CO
        3.0   ESDP   86/12  91/05  HIGH   DRINKING
                                         WATER
        3.0   ESDP   86/12  91/05  HIGH   DRINKING
                                         WATER
        1.0  ESRO
       2.0  ESRO
       5.0  ESRO
       2.0  ESRO
91/05 MEDIUM  DRINKINS
               WATER
                          91/05 MEDIUM  DRINKING
                                         WATER
                          91/05 MEDIUM  DRINKING
                                         WATER
                          91/05 MEDIUM  DRINKING
                                         WATER
                          NOT
                         AVAIL
                          NOT
                         AVAIL
                                                    NOT
                                                   AVAIL
                          NOT
                         AVAIL
                          NOT
                         AVAIL
                          NOT
                        AVAIL
 NOT
AVAIL
 NOT
AVAIL
 NOT
AVAIL
 NOT
AVAIL
 NOT
AVAIL
 NOT
AVAIL
 NOT
AVAIL
 NOT
AVAIL
 NOT
AVAIL
 NOT
AVAIL
 NOT
AVAIL
 NOT
AVAIL

-------
                                 FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                         DEPARTMENT OF AGRICULTURE               FOREST SERVICE
                PROJECT IDENTIFICATION
                     REQ    EST   PROJECT
  BUDGET     COMPL   COMPL  COMPL ASSESS- MEDIA
(THOUSANDS)  STATUS  DATE   DATE  MENT    TYPE
                                                                     USDA-48
                            ADEQUACY OF PROJECT
                          ENGIN-
                          EERING    TIME      COST
CO-122307530 PROJECT: 0213000013
THOMPSON PARK CG-REPL STG TANK & DIST SYS
ACCT: Z5 SWA FUND SDWA
SAN JUAN NF
DURANGO                          CO

CO-122307530 PROJECT: 0213000014
FOREST WIDE - REPLACE 15 HANDPUMPS
ACCT: 25 SWA FUND SDWA
SAN JUAN NF
DURANGO                          CO

CO-122307530 PROJECT: 0213000016
CAYTEN CG
ACCT: Z5 SWA FUND SDWA
SAN JUAN NF
DURANGO                          CO

CO-122307530 PROJECT: 0213000023
JUNCTION CREEK CG WATER SYSTEM REHABILITATION
ACCT: 25 SWA FUND SDWA
SAN JUAN NF
DURANGO                          CO

CO-122307530 PROJECT: 0213000025
PURGATORY CG WATER SYSTEM REPLACEMENT
ACCT: 25 SWA FUND SDWA
SAN JUAN NF
DURANGO                          CO

CO-122307530 PROJECT: 0213000026
HAIRLAND LAKE CG WATER SYSTEM REPLACENNET
ACCT: 25 SWA FUND SDWA
SAN JUAN NF
DURANGO                          CO
        2.5  ESRO
        3.0  ESRO
        3.0  ESRO
        1.0  ESRO
        1.0  ESRO
        3.0  ESRO
91/05  LOW    DRINKING    NOT       NOT        NOT
               WATER     AVAIL     AVAIL      AVAIL
                           92/05 MEDIUM  DRINKING    NOT       NOT        NOT
                                          WATER     AVAIL     AVAIL      AVAIL
91/05 MEDIUM  DRINKING    NOT       NOT       NOT
               WATER     AVAIL     AVAIL     AVAIL
92/05 MEDIUM  DRINKING    NOT       NOT        NOT
               WATER     AVAIL     AVAIL      AVAIL
92/05 MEDIUM  DRINKING    NOT       NOT        NOT
               WATER     AVAIL     AVAIL      AVAIL
92/05 MEDIUM  DRINKING    NOT       NOT        NOT
               WATER     AVAIL     AVAIL      AVAIL

-------
                                  FEDERAL AGENCY  POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                          DEPARTMENT OF AGRICULTURE               FOREST SERVICE
                 PROJECT IDENTIFICATION
                    REQ    EST   PROJECT
  BUDGET     COMPL   COMPL  COMPL ASSESS- MEDIA
(THOUSANDS)   STATUS  DATE   DATE  MENT    TYPE
                                                                                                                      USDA-49
   ADEQUACY OF PROJECT
 ENGIN-
 EERING    TIME      COST
 CO-122307530 PROJECT: 0213000027
 CHRIS PARK CG WATER SYSTEM REPLACEMENT
 ACCT: 25 SWA FUND SDWA
 SAN JUAN NF
 DURANGO                          CO

 CO-122307530 PROJECT: 0213000028
 OLD TIMER CG WATER SYSTEM REPLACEMENT
 ACCT: 25 SWA FUND SDWA
 SAN JUAN NF
 DURANGO                          CO

 CO-122307530 PROJECT:  0213000029
 PINE  POINT  CG WATER  SYSTEM REPLACEMENT
 ACCT:  25 SWA FUND SDWA
 SAN JUAN NF
 DURANGO                           CO

 CO-122307530  PROJECT:  0213000030
 MIDDLE MOUNTAIN CG WATER  SYSTEM  REPLACEMENT
 ACCT:  25  SWA  FUND SDWA
 SAN JUAN  NF
 DURANGO                           CO

 CO-122307530  PROJECT:  0213000031
 TRANSFER  PARK CG  WATER SYSTEM REHAB/REPLACE
 ACCT:  25  SWA  FUND SDWA
 SAN JUAN  NF
 DURANGO                          CO

 CO-122307530  PROJECT:  0213000032
MILLER CREEK CG WATER SYSTEM REPLACEMENT
ACCT:  25  SWA FUND SDWA
SAN JUAN  NF
DURANGO                          CO
                                                        3.0  ESRO
        1.0   ESRO
        1.0   ESRO
        1.0  ESRO
        1.0  ESRO
       1.0  ESRO
                                                                           92/05 MEDIUM
                          92/05 MEDIUM
                          92/05 MEDIUM
                          92/05 MEDIUM
                          92/05 MEDIUM
                          92/05 MEDIUM
                                        DRINKING
                                         WATER
                                        DRINKING
                                         WATER
                                        DRINKING
                                         WATER
                                        DRINKING
                                         WATER
                                        DRINKING
                                         WATER
                                        DRINKING
                                         WATER
 NOT
AVAIL
 NOT
AVAIL
 NOT
AVAIL
 NOT
AVAIL
 NOT
AVAIL
 NOT
AVAIL
 NOT
AVAIL
 NOT
AVAIL
 NOT
AVAIL
 NOT
AVAIL
 NOT
AVAIL
 NOT
AVAIL
 NOT
AVAIL
 NOT
AVAIL
 NOT
AVAIL
 NOT
AVAIL
 NOT
AVAIL
 NOT
AVAIL

-------
                                 FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR  1991

                         DEPARTMENT OF AGRICULTURE               FOREST SERVICE
                PROJECT IDENTIFICATION
                     RE<3    EST   PROJECT
  BUDGET     COMPL   COMPL  COMPL ASSESS-  MEDIA
(THOUSANDS)   STATUS  DATE   DATE   MENT     TYPE
                                                                                                                     USDA-50
                            ADEQUACY OF  PROJECT
                          ENGIN-
                          EERING     TIME      COST
CO-122307530 PROJECT: 0213000033
VALLECITO CG WATER SYSTEM REHAB/REPLACEMENT
ACCT: 25 SWA FUND SDWA
SAN JUAN NF
DURANGO                          CO

CO-122307530 PROJECT: 0213000037
PINE RIVER CG WATER SYSTEM REPLACEMENT
ACCT: 25 SWA FUND SDWA
SAN JUAN NF
DURANGO                          CO

CO-122307530 PROJECT: 0213000036
ASPEN GS - REPLACE SEWAGE DISPOSAL SYSTEM
ACCT: 23 SWA FUND CWA-PS
SAN JUAN NF
DURANGO                          CO

CO-122307530 PROJECT: 0213000003
HUNT/RYMAN CREEKS GULLY PLUGS, RESHAPE, ETC
ACCT: 2
-------
                                  FEDERAL AGENCY  POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                          DEPARTMENT OF  AGRICULTURE               FOREST SERVICE
                 PROJECT IDENTIFICATION
                    REQ    EST   PROJECT
  BUDGET     COMPL   COMPL  COMPL ASSESS- MEDIA
(THOUSANDS)   STATUS  DATE   DATE  MENT    TYPE
                                                                                                                     USDA-51
  ADEQUACY OF PROJECT
ENGIN-
EERING    TIME      COST
 CO-122307530 PROJECT:  0213000022
 RICO GS SEWAGE DISPOSAL SYSTEM REPLACEMENT
 ACCT:  23 SWA FUND CWA-PS
 SAN JUAN NF
 DURANGO                         CO

 CO-122307533 PROJECT:  0215000011
 DOWD JUNCTION AS  DRILL NEW  WELL
 ACCT:  25 SWA FUND SDWA
 WHITE  RIVER,  NF
 GLENWOOD SPRINGS                 CO

 CO-122307533 PROJECT:  0215000012
 SWEETWATER  LAKE CG REDEVEL  SPRING/SURF CONTM
 ACCT:  25 SWA  FUND SDWA
 WHITE  RIVER,  NF
 GLENWOOD SPRINGS                 CO

 CO-122307533  PROJECT:  0215000013
 THREE  FORKS CG REDEVELOP SPRING OR DRILLWELL
 ACCT:  25  SWA  FUND SDWA
 WHITE  RIVER, NF
 GLENWOOD  SPRINGS                 CO

 CO-122307533 PROJECT:  0215000014
 COFFEE POT SPRGS--DEVEL NEW SPRG OR DRILL WELL
 ACCT:  25  SWA FUND SDWA
 WHITE  RIVER, NF
 GLENWOOD  SPRINGS                 CO

CO-122307533 PROJECT: 0215000016
VAULT WASTE DUMP STATION/UTILITY CONT. NO-2
ACCT: 23 SWA FUND CWA-PS
WHITE RIVER, NF
GLENWOOD SPRINGS                 CO
                                                        2.0  ESRO
                                                                           92/05 MEDIUM   WATER
                                                    NOT
                                                   AVAIL
       78.0   ESDP   86/12  90/09  HIGH   DRINKING    NOT
                                         WATER     AVAIL
        3.0   ESDP   86/12  93/09  HIGH   DRINKING    NOT
                                         WATER     AVAIL
       3.0  ESDP   86/12  93/09  HIGH   DRINKING    NOT
                                         WATER     AVAIL
       6.0  ESDP   87/12  91/09  HIGH
                                         WATER
                                                    NOT
                                                   AVAIL
          NOT
         AVAIL
          NOT
         AVAIL
          NOT
         AVAIL
        3.0  ESDP   86/12  93/09  HIGH   DRINKING    NOT       NOT
                                         WATER     AVAIL     AVAIL
          NOT
         AVAIL
          NOT
         AVAIL
 NOT
AVAIL
 NOT
AVAIL
 NOT
AVAIL
                     NOT
                    AVAIL
 NOT
AVAIL
 NOT
AVAIL

-------
                                 FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                         DEPARTMENT OF AGRICULTURE               FOREST SERVICE
                PROJECT IDENTIFICATION
                     REQ    EST   PROJECT
  BUDGET     COMPL   COMPL  COMPL ASSESS- MEDIA
(THOUSANDS)   STATUS  DATE    DATE   MENT    TYPE
                                                                     USDA-52
   ADEQUACY OF PROJECT
 ENGIN-
 EERING    TIME      COST
CO-122307533 PROJECT: 0315000002
PROSPECTOR CG REPLACE LEAKING VAULT TOILET
ACCT: 23 SWA FUND CWA-PS
WHITE RIVER, NF
GLENWOOD SPRINGS                 CO

CO-122307533 PROJECT: 0215000005
BLUE RIVER CG REPLACE LEAKING VAULT TOILET
ACCT: 23 SWA FUND CWA-PS
WHITE RIVER, NF
GLENWOOD SPRINGS                 CO

CO-122307533 PROJECT: 0215000006
CATARACT CG REPLACE LEAKING VAULT TOILET
ACCT: 23 SWA FUND CWA-PS
WHITE RIVER, NF
GLENWOOD SPRINGS                 CO

CO-122307533 PROJECT: 0215000017
RIFLE ADM. SEWER
ACCT: 23 SWA FUND CWA-PS
WHITE RIVER, NF
GLENWOOD SPRINGS                 CO

CO-122316226 PROJECT: 2804001600
REMOVAL OF UNDERGROUND STORAGE TANKS-FRASER
ACCT: 12 DEPT FUND RCRA
ROCKY MTN EXPER STA HEADQTRS
FORT COLLINS                     CO

CO-122316226 PROJECT: 2S05001600
REMOVAL OF UNDERGROUND STORAGE TANKS-MANITOU
ACCT: 12 DEPT FUND RCRA
ROCKY MTN EXPER STA HEADQTRS
FORT COLLINS                     CO
        2.0  ESDP   87/12   92/09  HIGH    WATER
        2.0   ESDP   87/12   92/09  HIGH    WATER
        2.0   ESDP   87/12   92/09  HIGH    WATER
        4.0   ESDP    87/12   91/09  HIGH    WATER
        8.5   CMPA    91/09  90/09  HIGH
       15.0  CMPA   91/09  90/09  HIGH
                                         SOLID
                                         WASTE
                                         SOLID
                                         WASTE
                                                    NOT
                                                   AVAIL
                                                    NOT
                                                   AVAIL
                                                    NOT
                                                   AVAIL
                                                    NOT
                                                   AVAIL
 NOT
AVAIL
 NOT
AVAIL
           NOT
          AVAIL
           NOT
          AVAIL
           NOT
          AVAIL
           NOT
          AVAIL
 NOT
AVAIL
 NOT
AVAIL
            NOT
           AVAIL
            NOT
           AVAIL
            NOT
           AVAIL
            NOT
           AVAIL
 NOT
AVAIL
 NOT
AVAIL

-------
                                  FEDERAL AGENCY  POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                          DEPARTMENT OF  AGRICULTURE               FOREST SERVICE
                 PROJECT IDENTIFICATION
                    REQ    EST   PROJECT
  BUDGET      COMPL   COMPL  COMPL ASSESS- MEDIA
(THOUSANDS)   STATUS  DATE   DATE  MENT    TYPE
                                                                                                                     USDA-53
               ADEQUACY OF  PROJECT
             ENGIN-
             EERING    TIME      COST
 CO-122316226 PROJECT:  2800000001
 SEAL/RESEAL ASBESTOS WRAPPED  PIPING
 ACCT:  27 SWA FUND  TSCA
 ROCKY  MTN EXPER  STA HEADQTRS
 FORT COLLINS                     CO

 CT-122311630 PROJECT:  2407000017
 NEFES  CTR BIOLOGICAL CT,  UST  REMOVAL-1
 ACCT:  12 DEPT FUND  RCRA
 ANSONIA  FIELD RES  SITE
 ANSONIA                           CT

 CT-122311830 PROJECT:  2407000018
 NEFES  CTR FOR BIOLOGICAL  CT,  UST  REMOVAL-2
 ACCT:  12  DEPT FUND  RCRA
 ANSONIA  FIELD RES SITE
 ANSONIA                           CT

 CT-122311830  PROJECT:  2407000019
 NEFES, ANSONIA LAB  CT, UST REMOVAL-1
 ACCT:  12  DEPT FUND  RCRA
 ANSONIA  FIELD  RES SITE
 ANSONIA                           CT

 CT-122311830  PROJECT:  2407000020
 NEFES ANSONIA  LAB,   CT, UST REMOVAL-2
 ACCT: 12  DEPT FUND  RCRA
 ANSONIA FIELD RES SITE
 ANSONIA                          CT

 CT-122311830  PROJECT:  2407000021
 NEFES ANSONIA  LAB,   CT, UST REMOVAL-3
ACCT: 12 DEPT FUND  RCRA
ANSONIA FIELD RES SITE
ANSONIA                          CT
       30.0   PSDF   93/01  91/01  HIGH
  TOXIC
SUBSTANCE
ADEQUATE  ADEQUATE   ADEQUATE
 DESIGN    TIMING    ESTIMATE
       10.0   ESRO   91/09  91/01 MEDIUM
       5.0   ESRO   91/09  91/01 MEDIUM
       5.0  ESRO   91/09  91/01 MEDIUM
       5.0  ESRO   91/09  91/01 MEDIUM
       5.0  ESRO   91/09  91/01 MEDIUM
  SOLID
  WASTE
  SOLID
  WASTE
                                         SOLID
                                         WASTE
                                         SOLID
                                         WASTE
                                         SOLID
                                         WASTE
                                                    NOT
                                                   AVAIL
                                                    NOT
                                                   AVAIL
             NOT
            AVAIL
             NOT
            AVAIL
             NOT
            AVAIL
            NOT
           AVAIL
            NOT
           AVAIL
            NOT
           AVAIL
            NOT
           AVAIL
            NOT
           AVAIL
 NOT
AVAIL
 NOT
AVAIL
 NOT
AVAIL
 NOT
AVAIL
 NOT
AVAIL

-------
                                 FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                         DEPARTMENT OF AGRICULTURE               FOREST SERVICE
                PROJECT IDENTIFICATION
                     REQ    EST   PROJECT
  BUDGET     COMPL   COMPL  COMPL ASSESS- MEDIA
(THOUSANDS)  STATUS  DATE   DATE  MENT    TYPE
                                                                                                                     USDA-54
  ADEQUACY OF PROJECT
ENGIN-
EERING    TIME      COST
CT-122311830 PROJECT: 2407000022
NEFES ANSONIA LAB CT, UST REMOVAL-*
ACCT: 12 DEPT FUND RCRA
ANSONIA FIELD RES SITE
ANSONIA                          CT

FL-122307720 PROJECT: 0805069602
WOOD LAKE -- REPLACE PIT TOILET
ACCT: 23 SWA FUND CWA-PS
APALACHICOLA N.F.
TALLAHASSEE                      FL

FL-122307720 PROJECT: 0805069601
MACK LANDING -- REPLACE PIT TOILET
ACCT: 23 SWA FUND CWA-PS
APALACHICOLA N.F.
TALLAHASSEE                      FL

FL-122307720 PROJECT: 0805069600
BUCKHORN REPLACE EXISTING VAULT TOILET
ACCT: 23 SWA FUND CWA-PS
APALACHICOLA N.F.
TALLAHASSEE                      FL

FL-122307720 PROJECT: 0805059504
FARLES PRAIRIE REPLACE TWO VAULT TOILETS
ACCT: 23 SWA FUND CWA-PS
APALACHICOLA N.F.
TALLAHASSEE                      FL

FL-122307720 PROJECT: 0805059503
BUCK LAKE REPLACE EXISTING VAULT TOILET
ACCT: 23 SWA FUND CWA-PS
APALACHICOLA N.F.
TALLAHASSEE                      FL
        5.0  ESRO   91/09  91/01  MEDIUM   SOLID      NOT       NOT
                                          WASTE      AVAIL     AVAIL
                     NOT
                    AVAIL
       30.0  ESDP   88/01   90/11   HIGH     WATER     ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
       30.0  ESDP   88/01   90/11   HIGH    WATER    ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
       30.0  ESDP   88/01   90/10  HIGH    WATER
       30.0  ESDP   88/01   90/11  HIGH    WATER
                                                  ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
                                                  ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
       30.0  ESDP   87/12   90/10  HIGH    WATER    ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE

-------
                                  FEDERAL AGENCY POLLUTION  ABATEMENT  PLAN FOR FISCAL YEAR 1991

                          DEPARTMENT OF AGRICULTURE                FOREST SERVICE
                                                                     USDA-55
                 PROJECT IDENTIFICATION
                     REQ    EST    PROJECT
  BUDGET     COMPL    COMPL   COMPL  ASSESS- MEDIA
(THOUSANDS)   STATUS  DATE    DATE   MENT    TYPE
  ADEQUACY OF PROJECT
ENGIN-
EERING    TIME      COST
 GA-122307716 PROJECT:  0803030002
 NEW WATER WELL FOR CHESTATEE WORK  CENTER
 ACCT: 25 SWA FUND SDWA
 CHATTAHOOCHEE-OCONEE N.F.
 GAINESVILLE                     GA

 GA-122307716 PROJECT:  0803080002
 REMOVE UNDERGROUND TANKS AT  NEW  OCONEE W.C.
 ACCT: 12 DEPT FUND RCRA
 CHATTAHOOCHEE-OCONEE N.F.
 GAINESVILLE                     GA

 GA-122307717 PROJECT:  OS03000002
 WATER TESTING (PRIMARY AND SECONDARY)
 ACCT:  25 SWA FUND  SDWA
 CHATTAHOOCHEE-OCONEE N.F.
 GAINESVILLE                     GA

 GA-122307717 PROJECT:  0803000004
 CORRECT  HIGH IRON  CONTENT IN WATER SYSTEMS
 ACCT:  25 SWA FUND  SDWA
 CHATTAHOOCHEE-OCONEE N.F.
 GAINESVILLE                      GA

 GA-122307717 PROJECT:  0803050002
 FIX/MOVE/REPLACE/  WATERLINES AT  RABUN BEACH
 ACCT:  25  SWA FUND  SDWA
 CHATTAHOOCHEE-OCONEE N.F.
 GAINESVILLE                      GA

 GA-122307717  PROJECT:  0803059339
 TALLULAH  RIVER WATERSHED IMPROVEMENT
ACCT:  24  SWA  FUND CWA-NPS
CHATTAHOOCHEE-OCONEE N.F.
GAINESVILLE                      GA
        7.0   ESDP   86/12   91/02  HIGH   DRINKING  ADEQUATE  ADEQUATE   ADEQUATE
                                         WATER     DESIGN    TIMING    ESTIMATE
       25.0   ESDF    93/12   90/11  HIGH    SOLID    ADEQUATE  ADEQUATE   ADEQUATE
                                         WASTE     DESIGN    TIMING    ESTIMATE
        5.3   ESDP    79/12   91/02  HIGH   DRINKING    NOT       NOT        NOT
                                         WATER     AVAIL     AVAIL      AVAIL
       23.0   ESDP   86/12  91/01  HIGH   DRINKING    NOT       NOT        NOT
                                         WATER     AVAIL     AVAIL      AVAIL
       14.0  ESDP   79/12  90/12  HIGH   DRINKING  ADEQUATE  ADEQUATE   ADEQUATE
                                         WATER     DESIGN    TIMING    ESTIMATE
       17.0  ESDP   87/12  91/01  HIGH    WATER      NOT       NOT        NOT
                                                   AVAIL     AVAIL      AVAIL

-------
                                 FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                         DEPARTMENT OF AGRICULTURE               FOREST SERVICE
                PROJECT IDENTIFICATION
                     REQ    EST   PROJECT
  BUDGET     COMPL   COMPL  COMPL ASSESS- MEDIA
(THOUSANDS)  STATUS  DATE   DATE  MENT    TYPE
                                                                      USDA-56
  ADEQUACY OF PROJECT
ENGIN-
EERING    TIME      COST
GA-122307717 PROJECT: 080303933*
ETOWAH RIVER WATERSHED IMPROVEMENT
ACCT: 24 SWA FUND CWA-NPS
CHATTAHOOCHEE-OCONEE N.F.
GAINESVILLE                      GA

GA-122307717 PROJECT: 0803039335
CHESTATEE RIVER WATERSHED IMPROVEMENT
ACCT: 2* SWA FUND CWA-NPS
CHATTAHOOCHEE-OCONEE N.F.
GAINESVILLE                      GA

GA-122307717 PROJECT: 0803080011
LAKE SINCLAIR RA SAND FILTER SEWAGE TREAT
ACCT: 23 SWA FUND CWA-PS
CHATTAHOOCHEE-OCONEE N.F.
GAINESVILLE                      GA

GA-122307717 PROJECT: 0803069332
CHATTAHOOCHEE RIVER WATERSHED IMPROVEMENT
ACCT: 2<+ SWA FUND CWA-NPS
CHATTAHOOCHEE-OCONEE N.F.
GAINESVILLE                      GA

GA-122307717 PROJECT: 0803069333
NORTHFORK BOARD RIVER WATERSHED IMPROVEMENT
ACCT: 24 SWA FUND CWA-NPS
CHATTAHOOCHEE-OCONEE N.F.
GAINESVILLE                      GA

GA-122307717 PROJECT: 0803080003
TWO UNIT CHEMICAL TOILETS AT OCONEE RIVER RA
ACCT: 23 SWA FUND CWA-PS
CHATTAHOOCHEE-OCONEE N.F.
GAINESVILLE                      GA
        8.0  ESDP   87/12  91/02  HIGH    WATER
       20.0  ESDP   87/12  90/12  HIGH    WATER
       75.0  ESDP   87/12  91/02  HIGH    WATER
       20.0   ESDP   87/12   90/09  HIGH     WATER
       20.0   ESDF   95/09  90/12  MEDIUM   HATER
       23.0   ESDF    88/12   91/11  MEDIUM   WATER
                                                     NOT
                                                    AVAIL
                                                     NOT
                                                    AVAIL
          NOT
         AVAIL
          NOT
         AVAIL
                                                   ADEQUATE  ADEQUATE
                                                    DESIGN    TIMING
                                                  ADEQUATE  ADEQUATE
                                                   DESIGN    TIMING
                                                    NOT
                                                   AVAIL
          NOT
         AVAIL
                                                  ADEQUATE  ADEQUATE
                                                   DESIGN    TIMING
 NOT
AVAIL
 NOT
AVAIL
                   ADEQUATE
                   ESTIMATE
                   ADEQUATE
                   ESTIMATE
 NOT
AVAIL
                  ADEQUATE
                  ESTIMATE

-------
                                  FEDERAL AGENCY  POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                          DEPARTMENT OF  AGRICULTURE               FOREST SERVICE
                 PROJECT IDENTIFICATION
                    REQ    EST   PROJECT
  BUDGET     COMPL   COMPL  COMPL ASSESS- MEDIA
(THOUSANDS)   STATUS  DATE   DATE  MENT    TYPE
                                                                                                                     USDA-57
    ADEQUACY OF PROJECT
  ENGIN-
  EERING    TIME      COST
 GA-122307717 PROJECT:  0803020003
 TWO UNIT CHEMICAL TOILETS AT DEEP  HOLE  PA
 ACCT:  23 SWA FUND CWA-PS
 CHATTAHOOCHEE-OCONEE N.F.
 GAINESVILLE                     GA

 GA-122313974 PROJECT:  2918160001
 ATHENS PCB TRANSFORMER REPLACEMENT
 ACCT:  Z7 SWA FUND TSCA
 SOUTHEASTERN STATION
 ASHEVILLE                       GA

 ID-122307463 PROJECT:  0100000007
 ASBESTOS MONITORING  -  IDAHO
 ACCT:  27 SWA FUND TSCA
 IDAHO  PANHANDLE NFS
 COEUR  D'ALENE                    ID

 ID-122307483 PROJECT:  0104010001
 WALLACE  RS  UST
 ACCT:  12  DEPT FUND RCRA
 IDAHO  PANHANDLE NFS
 COEUR  D'ALENE                    ID

 ID-122307483 PROJECT:  0104060002
 PRIEST LAKE  RS UST
 ACCT:  12  DEPT FUND RCRA
 IDAHO  PANHANDLE NFS
 COEUR D'ALENE                    ID

 ID-122307483 PROJECT:  0104906011
 COEUR D'ALENE NURSERY  UST
ACCT:  12 DEPT FUND RCRA
 IDAHO PANHANDLE NFS
COEUR D'ALENE                    ID
       23.0   ESDF    92/04  91/09 MEDIUM   WATER
       42.0   ESDP    11/01  90/12  HIGH    TOXIC
                                       SUBSTANCE
      100.0   PSDF   00/01  93/09 MEDIUM    AIR
       5.0  ESDF   91/12  91/05  HIGH
      45.0  ESDF   89/12  90/09  HIGH
       10.0  ESDF   89/12  90/09  HIGH
                                         SOLID
                                         WASTE
                                         SOLID
                                         WASTE
                                         SOLID
                                         WASTE
ADEQUATE  ADEQUATE   ADEQUATE
 DESIGN    TIMING    ESTIMATE
ADEQUATE  ADEQUATE   ADEQUATE
 DESIGN    TIMING    ESTIMATE
                                                  ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
ADEQUATE  ADEQUATE   ADEQUATE
 DESIGN    TIMING    ESTIMATE
ADEQUATE  ADEQUATE   ADEQUATE
 DESIGN    TIMING    ESTIMATE
ADEQUATE  ADEQUATE   ADEQUATE
 DESIGN    TIMING    ESTIMATE

-------
                                 FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                         DEPARTMENT OF AGRICULTURE               FOREST SERVICE
                PROJECT IDENTIFICATION
                     REQ    EST   PROJECT
  BUDGET     COMPL   COMPL  COMPL ASSESS- MEDIA
(THOUSANDS)  STATUS  DATE   DATE  MENT    TYPE
                                                                                                                      USDA-5S
  ADEQUACY OF PROJECT
ENGIN-
EERING    TIME      COST
ID-122307490 PROJECT: 0105012021
PIERCE WC UST
ACCT: 12 DEPT FUND RCRA
CLEARWATER NF
OROFINO                          ID

ID-122307490 PROJECT: 0105032011
CANYON WC UST
ACCT: 12 DEPT FUND RCRA
CLEARWATER NF
OROFIHO                          ID

ID-122307594 PROJECT: 040202500*
IRISH SPRING REDEVELOPMENT
ACCT: 25 SWA FUND SDWA
BOISE NF
BOISE                            ID

ID-122307594 PROJECT: 0402055001
WARM SPRINGS GUARD STATION SPRING REDEVELOPMENT
ACCT: 25 SWA FUND SDWA
BOISE NF
BOISE                            ID

ID-122307594 PROJECT: 0402034007
BAD BEAR/10 MILE/LAGER
ACCT: 24 SWA FUND CWA-NPS
BOISE NF
BOISE                            ID

ID-122307594 PROJECT: 0402044002
SOUTH FORK SALMON RIVER
ACCT: 24 SWA FUND CWA-NPS
BOISE NF
BOISE                            ID
       10.0  ESDF   89/12  90/09  HIGH     SOLID     ADEQUATE   ADEQUATE    ADEQUATE
                                          WASTE      DESIGN    TIMING     ESTIMATE
       15.0  ESDF   91/12  91/05  HIGH     SOLID     ADEQUATE  ADEQUATE   ADEQUATE
                                          WASTE     DESIGN    TIMING    ESTIMATE
       10.0  ESDP   85/07  91/07  HIGH    DRINKING   ADEQUATE  ADEQUATE   ADEQUATE
                                          WATER     DESIGN    TIMING    ESTIMATE
        6.0  ESDP   99/12   91/07   HIGH    DRINKING  ADEQUATE  ADEQUATE   ADEQUATE
                                          WATER     DESIGN    TIMING    ESTIMATE
       20.0  ESDP   87/07  99/07   HIGH    WATER    ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
       60.0  ESDP   87/07   91/07  HIGH    WATER    ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE

-------
                                  FEDERAL AGENCY  POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                          DEPARTMENT OF AGRICULTURE               FOREST SERVICE
                 PROJECT IDENTIFICATION
                     REQ     EST   PROJECT
  BUDGET     COMPL    COMPL   COMPL ASSESS- MEDIA
(THOUSANDS)   STATUS   DATE    DATE  MENT    TYPE
                                                                                                                      USDA-59
  ADEQUACY OF PROJECT
ENGIN-
EERING    TIME      COST
 ID-122307598 PROJECT: 0405004001
 FOREST WIDE ROADS
 ACCT: 24 SWA FUND CWA-NPS
 CARIBOU NATIONAL FOREST
 POCATELLO                        ID

 ID-122307598 PROJECT: 0405031004
 GEORGETOWN SEDIMENTATION PONDS
 ACCT: 11 DEPT FUND CERCLA
 CARIBOU NATIONAL FOREST
 POCATELLO                        ID

 ID-122307598 PROJECT:  0405023007
 CARIBOU GUARD STATION
 ACCT:  23 SWA FUND  CWA-PS
 CARIBOU NATIONAL FOREST
 POCATELLO                        ID

 ID-122307598 PROJECT:  0405043005
 SUMMIT  GUARD STATION
 ACCT:  23 SWA FUND  CWA-PS
 CARIBOU NATIONAL FOREST
 POCATELLO                         ID

 ID-122307602  PROJECT:  0406045004
 ANTELOPE GUARD STATION
 ACCT: 25 SWA  FUND  SDWA
 CHALLIS  NATIONAL FOREST
 CHALLIS                          ID

 ID-122307602  PROJECT: 0406045005
 FAIRVIEW GUARD STATION
ACCT: 25 SWA  FUND  SDWA
CHALLIS NATIONAL FOREST
CHALLIS                          ID
       50.0   OTHR    87/07   91/02 MEDIUM  DRINKING  ADEQUATE  ADEQUATE   ADEQUATE
                                         WATER     DESIGN    TIMING    ESTIMATE
       20.0   ESDP   86/10   90/09  HIGH    CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
       20.0   ESDF    99/12  91/07 MEDIUM   WATER    ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
       20.0   ESDF   85/10  94/02  LOW     WATER    ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
      28.0  ESDP   85/07  91/07  HIGH   DRINKING  /ADEQUATE  ADEQUATE   ADEQUATE
                                         WATER     DESIGN    TIMING    ESTIMATE
       7.0  ESDP   85/07  91/07  HIGH   DRINKING  ADEQUATE  ADEQUATE   ADEQUATE
                                         WATER     DESIGN    TIMING    ESTIMATE

-------
                                 FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                         DEPARTMENT OF AGRICULTURE               FOREST SERVICE
                PROJECT IDENTIFICATION
                     REQ    EST   PROJECT
  BUDGET     COMPL   COMPL  COMPL ASSESS- MEDIA
(THOUSANDS)  STATUS  DATE   DATE  MENT    TYPE
                                                                      USDA-60
  ADEQUACY OF PROJECT
ENGIN-
EERING    TIME      COST
ID-122307602 PROJECT: 0406036003
YANKEE FORK RANGER DISTRICT
ACCT: 26 SWA FUND FIFRA
CHALLIS NATIONAL FOREST
CHALLIS                          ID

ID-122307602 PROJECT: 0*06024003
MORGAN CREEK
ACCT: 24 SWA FUND CWA-NPS
CHALUS NATIONAL FOREST
CHALLIS                          ID

ID-122307607 PROJECT: 0412055002
CHAMBERLAIN GUARD STATION WATER SYSTEM
ACCT: 25 SWA FUND SDWA
PAYETTE NATIONAL FOREST
MCCALL                           ID

ID-122307607 PROJECT: 0412055004
KRASSEL RANGER STATION WATER SYSTEM.
ACCT: 25 SWA FUND SDWA
PAYETTE NATIONAL FOREST
MCCALL                           ID

ID-122307607 PROJECT: 0412055005
KRASSEL RANGER STATION LOWER WATER SYSTEM
ACCT: 25 SWA FUND SDWA
PAYETTE NATIONAL FOREST
MCCALL                           ID

ID-122307607 PROJECT: 0412055001
BUCKHORN BAR CAMPGROUND WATER SYSTEM
ACCT: 25 SWA FUND SDWA
PAYETTE NATIONAL FOREST
MCCALL                           ID
       20.0  ESDF   90/10  94/02 MEDIUM PESTICIDES ADEQUATE  ADEQUATE    ADEQUATE
                                                    DESIGN    TIMING    ESTIMATE
       28.0  ESDP   87/07  91/02  HIGH    WATER    ADEQUATE  ADEQUATE    ADEQUATE
                                                    DESIGN    TIMING     ESTIMATE
      100.0  ESDP   85/07  91/02  HIGH   DRINKING  ADEQUATE  ADEQUATE   ADEQUATE
                                          WATER     DESIGN   TIMING    ESTIMATE
       20.0   ESDP   85/07  91/02   HIGH    DRINKING  ADEQUATE  ADEQUATE   ADEQUATE
                                          WATER     DESIGN    TIMING    ESTIMATE
       30.0   ESDP   85/07  91/01   HIGH    DRINKING  ADEQUATE  ADEQUATE   ADEQUATE
                                          WATER     DESIGN    TIMING    ESTIMATE
       25.0   ESDP   85/07  91/01   HIGH    DRINKING  ADEQUATE  ADEQUATE   ADEQUATE
                                          WATER     DESIGN    TIMING    ESTIMATE

-------
                                  FEDERAL AGENCY  POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                          DEPARTMENT OF  AGRICULTURE               FOREST SERVICE
                 PROJECT IDENTIFICATION
                    REQ    EST   PROJECT
  BUDGET     COMPL   COMPL  COMPL ASSESS- MEDIA
(THOUSANDS)   STATUS  DATE   DATE  MENT    TYPE
                                                                                                                     USDA-61
  ADEQUACY OF PROJECT
ENGIN-
EERING    TIME      COST
 10-122307607 PROJECT:  0412035003
 COLD MEADOWS WATER SYSTEM
 ACCT: 25 SWA FUND SDWA
 PAYETTE NATIONAL FOREST
 MCCALL                           ID

 ID-122307607 PROJECT:  0412035006
 LAST CHANCE CAMPGROUND HAND  PUMP
 ACCT: 25 SWA FUND SDWA
 PAYETTE NATIONAL FOREST
 MCCALL                           ID

 ID-122307607 PROJECT:  0412015007
 LAFFERTY CAMPGROUND  HAND  PUMP
 ACCT:  25 SWA FUND SDWA
 PAYETTE NATIONAL FOREST
 MCCALL                           ID

 ID-122307607 PROJECT:  0412015008
 HUCKLEBERRY  CAMPGROUND  PUMP  INSTALLATION
 ACCT:  25  SWA FUND  SDWA
 PAYETTE NATIONAL  FOREST
 MCCALL                            ID

 ID-122307607 PROJECT: 0412015009
 EVERGREEN CAMPGROUND WATERLINE
 ACCT:  25 SWA  FUND  SDWA
 PAYETTE NATIONAL FOREST
 MCCALL                            ID

 ID-122307607  PROJECT: 0412033001
COLD SPRINGS CAMPGROUND VAULTS
ACCT: 23 SWA FUND CWA-PS
PAYETTE NATIONAL FOREST
MCCALL                           ID
       50.0   ESDP   85/07  91/02  HIGH   DRINKING  ADEQUATE  ADEQUATE   ADEQUATE
                                         WATER     DESIGN    TIMING    ESTIMATE
        5.0   ESDP   85/07  91/07  HIGH   DRINKING  ADEQUATE  ADEQUATE   ADEQUATE
                                         WATER     DESIGN    TIMING    ESTIMATE
       5.0  ESDP   85/07  91/01  HIGH   DRINKING  ADEQUATE  ADEQUATE   ADEQUATE
                                         WATER     DESIGN    TIMING    ESTIMATE
       5.0  ESDP   85/07  91/02  HIGH   DRINKING  ADEQUATE  ADEQUATE   ADEQUATE
                                         WATER     DESIGN    TIMING    ESTIMATE
       5.0  ESDP   85/07  91/02  HIGH   DRINKING  ADEQUATE  ADEQUATE   ADEQUATE
                                         WATER     DESIGN    TIMING    ESTIMATE
      40.0  ESDP   85/10  91/07  HIGH    WATER    ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE

-------
                                 FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR  1991

                         DEPARTMENT OF AGRICULTURE               FOREST SERVICE
                PROJECT IDENTIFICATION
                     REQ    EST   PROJECT
  BUDGET     COMPL   COMPL  COMPL ASSESS-  MEDIA
(THOUSANDS)  STATUS  DATE   DATE   MENT     TYPE
                                                                                                                     USDA-62
    ADEQUACY OF PROJECT
  ENGIN-
  EERING    TIME      COST
ID-122307607 PROJECT: 0412033002
SLAUGHTER GULCH CAMPGROUND
ACCT: 23 SWA FUND CWA-PS
PAYETTE NATIONAL FOREST
MCCALL                           ID

ID-122307607 PROJECT: 0412033003
LOST VALLEY RESERVATION AREA
ACCT: 23 SWA FUND CWA-PS
PAYETTE NATIONAL FOREST
MCCALL                           ID

ID-122307607 PROJECT: 0412033005
HAZARD LAKE CAMPGROUND
ACCT: 23 SWA FUND CWA-PS
PAYETTE NATIONAL FOREST
MCCALL                           ID

ID-122307607 PROJECT: 0412033037
CLAYBOURN TRAILHEAD
ACCT: 23 SWA FUND CWA-PS
PAYETTE NATIONAL FOREST
MCCALL                           ID

ID-122307607 PROJECT: 0412043004
UPPER PAYETTE LAKE CAMPGROUND
ACCT: 23 SWA FUND CWA-PS
PAYETTE NATIONAL FOREST
MCCALL                           ID

ID-122307607 PROJECT: 0412064001
MCCALL-YELLOWPINE ROAD
ACCT: 24 SWA FUND CWA-NPS
PAYETTE NATIONAL FOREST
MCCALL                           ID
       30.0  ESDP   85/10  91/02   HIGH     HATER
       20.0  ESDP   85/10   91/02   HIGH    WATER
       30.0  ESDP   85/10   91/02  HIGH    WATER
        6.0  ESDP   85/10   94/02  HIGH    WATER
       30.0  ESDP   85/10   91/02  HIGH    WATER
      897.0  ESDP   87/07   91/03  HIGH    WATER
ADEQUATE  ADEQUATE   ADEQUATE
 DESIGN    TIMING    ESTIMATE
ADEQUATE  ADEQUATE   ADEQUATE
 DESIGN    TIMING    ESTIMATE
                                                  ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
ADEQUATE  ADEQUATE   ADEQUATE
 DESIGN    TIMING    ESTIMATE
                                                  ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
                                                  ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE

-------
                                  FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                          DEPARTMENT OF AGRICULTURE               FOREST SERVICE
                 PROJECT IDENTIFICATION
                                    REQ    EST    PROJECT
                 BUDGET     COMPL   COMPL  COMPL  ASSESS- MEDIA
               (THOUSANDS)   STATUS  DATE    DATE   MENT    TYPE
                                                                                                                      USDA-63
  ADEQUACY OF PROJECT
ENGIN-
EERING    TIME      COST
 ID-122307607 PROJECT:  0412064003
 JACKIE CR./MINERS PEAK ROAD
 ACCT:  24 SWA FUND CWA-NPS
 PAYETTE NATIONAL FOREST
 MCCALL                           ID
 ID-122307607 PROJECT:  0412064005
 BLACKMARE ROAD
 ACCT:  24 SWA FUND  CWA-NPS
 PAYETTE  NATIONAL FOREST
 MCCALL
                      21.5  ESDP   87/07  91/01  HIGH    WATER    ADEQUATE  ADEQUATE   ADEQUATE
                                                                  DESIGN    TIMING    ESTIMATE
 ID-122307608  PROJECT:  0413011001
 BLACKBIRD  MINE
 ACCT:  11 DEPT FUND  CERCLA
 SALMON NATIONAL  FOREST
 SALMON

 ID-122307609  PROJECT:  0414045002
 ALTHURAS NORTH SHORE
 ACCT:  25 SWA  FUND SDWA
 SAWTOOTH NF
 TWIN FALLS
                                  ID
ID
                                 ID
ID-122307609 PROJECT: 0414045003
ALTURAS INLET
ACCT: 25 SWA FUND SDWA
SAWTOOTH NF
TWIN FALLS                       ID

ID-122307609 PROJECT: 0414045004
REDFISH OUTLET
ACCT: 25 SWA FUND SDWA
SAWTOOTH NF
TWIN FALLS                       ID
                                                       18.5  ESDP   87/07  91/02  HIGH
                                                      480.0  ESDP   86/10  92/07  HIGH
                                                        WATER    ADEQUATE  ADEQUATE   ADEQUATE
                                                                  DESIGN    TIMING    ESTIMATE
                                                        CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
                                                                  DESIGN    TIMING    ESTIMATE
                      95.0   ESDP    85/07   91/02  HIGH   DRINKING  ADEQUATE  ADEQUATE   ADEQUATE
                                                        WATER     DESIGN    TIMING    ESTIMATE
                      92.0   ESDP    85/07   91/02  HIGH   DRINKING  ADEQUATE  ADEQUATE   ADEQUATE
                                                        WATER     DESIGN    TIMING    ESTIMATE
                       1.5   ESDP   85/07  91/07  HIGH   DRINKING  ADEQUATE  ADEQUATE   ADEQUATE
                                                        WATER     DESIGN    TIMING    ESTIMATE

-------
                                 FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                         DEPARTMENT OF AGRICULTURE               FOREST SERVICE
                PROJECT IDENTIFICATION
                     REQ    EST   PROJECT
  BUDGET     COMPL   COMPL  COMPL ASSESS- MEDIA
(THOUSANDS)  STATUS  DATE   DATE  MENT    TYPE
                                                                     USDA-64
  ADEQUACY OF PROJECT
ENGIN-
EERING    TIME      COST
ID-122307609 PROJECT: 0414045005
SAWTOOTH NATIONAL RECREATION AREA HQ
ACCT: 25 SWA FUND SDWA
SAWTOOTH NF
TWIN FALLS                       ID

ID-122307609 PROJECT: 0414025001
PENSTEMON PICNIC WATER SYSTEM
ACCT: 25 SWA FUND SDWA
SAWTOOTH NF
TWIN FALLS                       ID

ID-122307609 PROJECT: 0414025047
SCHIPPER PICNIC GROUND
ACCT: 25 SWA FUND SDWA
SAWTOOTH NF
TWIN FALLS                       ID

ID-122307609 PROJECT: 0414026004
ROCK CREEK ADMINISTRATION SITE
ACCT: 26 SWA FUND FIFRA
SAWTOOTH NF
TWIN FALLS                       ID

ID-122307609 PROJECT: 0414046003
NORTH FORK ADMINISTRATION SITE
ACCT: 26 SWA FUND FIFRA
SAWTOOTH NF
TWIN FALLS                       ID

ID-122307609 PROJECT: 0414056001
FAIRFIELD ADMINISTRATION SITE
ACCT: 26 SWA FUND FIFRA
SAWTOOTH NF
TWIN FALLS                       ID
        2.7  ESDP   85/07  91/07  HIGH   DRINKING  ADEQUATE  ADEQUATE   ADEQUATE
                                          WATER     DESIGN   TIMING    ESTIMATE
       S2.5  ESDP   85/07  91/02  HIGH   DRINKING   NOT       NOT        NOT
                                          WATER      AVAIL     AVAIL      AVAIL
       13.0  ESDP   85/07  90/10   HIGH    DRINKING  ADEQUATE  ADEQUATE   ADEQUATE
                                          WATER      DESIGN    TIMING    ESTIMATE
       24.0  ESDP   95/12  91/02   HIGH   PESTICIDES ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
       24.0  ESDP   90/10  91/02   HIGH   PESTICIDES ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
       24.0  ESDP   90/10   91/02  HIGH   PESTICIDES ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE

-------
                                  FEDERAL  AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                          DEPARTMENT  OF  AGRICULTURE               FOREST SERVICE
                 PROJECT IDENTIFICATION
                     REQ     EST   PROJECT
  BUDGET     COMPL    COMPL   COMPL ASSESS- MEDIA
(THOUSANDS)   STATUS   DATE    DATE  MENT    TYPE
                                                                                                                      USDA-65
  ADEQUACY OF PROJECT
ENGIN-
EERING    TIME      COST
 ID-122307609 PROJECT:  0414023001
 ROCK CREEK ADMINISTRATION SITE
 ACCT: 23 SWA FUND CWA-PS
 SAWTOOTH NF
 TWIN FALLS                       ID

 ID-122307612 PROJECT:  0415045017
 FALLS CAMPGROUND
 ACCT: 25 SWA FUND SDWA
 TARGHEE  NATIONAL  FOREST
 ST.  ANTHONY                      ID

 ID-122307612 PROJECT:  0415015015
 STODDARD CREEK  CAMPGROUND
 ACCT: 25 SKA FUND SDWA
 TARGHEE  NATIONAL  FOREST
 ST.  ANTHONY                      ID

 ID-122307612 PROJECT:  0415015004
 KILLGORE  WORK CENTER
 ACCT:  25  SWA FUND SDWA
 TARGHEE  NATIONAL  FOREST
 ST.  ANTHONY                      ID

 ID-122307612 PROJECT:  0415046002
 SWAN  VALLEY WORK  CENTER
 ACCT:  26  SWA FUND  FIFRA
 TARGHEE NATIONAL  FOREST
 ST. ANTHONY                      ID

 ID-122307612 PROJECT:  0415023001
 BUFFALO CAMPGROUND SEWER HOOKUP
ACCT:  23  SWA FUND CWA-PS
TARGHEE NATIONAL  FOREST
ST. ANTHONY                       ID
       62.0   OTHR   85/10  90/09 MEDIUM   WATER    ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
       40.0   ESDP   85/07  90/12  HIGH   DRINKING  ADEQUATE  ADEQUATE   ADEQUATE
                                         WATER     DESIGN    TIMING    ESTIMATE
       31.0   ESDP   85/07  90/12  HIGH   DRINKING  ADEQUATE  ADEQUATE   ADEQUATE
                                         WATER     DESIGN    TIMING    ESTIMATE
       29.0   ESDP   85/07  90/12  HIGH   DRINKING  ADEQUATE  ADEQUATE   ADEQUATE
                                         WATER     DESIGN    TIMING    ESTIMATE
       27.0   OTHR   90/10  90/12 MEDIUM PESTICIDES ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
      247.0   ESDP   85/10  90/12  HIGH    WATER    ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE

-------
                                 FEDERAL ASENCY POLLUTION ABATEMENT PLAN FOR  FISCAL  YEAR  1991

                         DEPARTMENT OF AGRICULTURE               FOREST SERVICE
                PROJECT IDENTIFICATION
                     REQ    EST    PROJECT
  BUDGET     COMPL   COMPL  COMPL  ASSESS- MEDIA
(THOUSANDS)   STATUS  DATE    DATE   MENT    TYPE
                                                                                                                     USDA-66
   ADEQUACY OF PROJECT
 ENGIN-
 EERING    TIME      COST
IL-122307774 PROJECT: 0908000320
ABANDONED WELLS AND CISTERNS
ACCT: 23 SWA FUND CWA-PS
SHAWNEE N.F.
HARRISBURG                       IL

IL-122307774 PROJECT: 0908000322
71 SILICA MINES
ACCT: 23 SWA FUND CWA-PS
SHAWNEE N.F.
HARRISBURG                       IL

IL-122307774 PROJECT: 0908010317
INVERNESS PROPERTY PLUG MINES
ACCT: 23 SWA FUND CWA-PS
SHAWNEE N.F.
HARRISBURG                       IL

IL-122307774 PROJECT: 0908010323
EMPIRE MINE SHAFT
ACCT: 23 SWA FUND CWA-PS
SHAWNEE N.F.
HARRISBURG                       IL

IL-122307774 PROJECT: 0908010327
MINE SHAFT T12S R7E SEC3 NE1/4
ACCT: 23 SWA FUND CWA-PS
SHAWNEE N.F.
HARRISBURG                       IL

IL-122307774 PROJECT: 0908010329
MINE SHAFT T11S R8E SEC17
ACCT: 23 SWA FUND CWA-PS
SHAWNEE N.F.
HARRISBURS                       IL
    1,500.0  ESDP   87/12   90/12   HIGH    WATER      NOT       NOT        NOT
                                                   AVAIL     AVAIL      AVAIL
      411.3  ESDP   87/12   91/09  HIGH    WATER      NOT       NOT        NOT
                                                   AVAIL     AVAIL      AVAIL
         .0  ESDP   87/12   90/09 MEDIUM   WATER    ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
        2.0  ESDP   87/12   90/09 MEDIUM   WATER
        2.1  ESDP   87/12   90/12  HIGH    WATER
                                                  ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
 NOT       NOT
AVAIL     AVAIL
                                                                         NOT
                                                                        AVAIL
        2.1   ESDP   87/12   90/12 MEDIUM   WATER    ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE

-------
                                  FEDERAL AGENCY  POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                          DEPARTMENT OF AGRICULTURE               FOREST SERVICE
                 PROJECT IDENTIFICATION
                     REQ     EST    PROJECT
  BUDGET     COMPL    COMPL   COMPL  ASSESS- MEDIA
(THOUSANDS)   STATUS   DATE    DATE   MENT    TYPE
                                                                     USDA-67
   ADEQUACY OF PROJECT
 ENGIN-
 EERING    TIME      COST
 IL-122307774 PROJECT:  0908050310
 GOLCONDA JOB CORPS
 ACCT: 23 SWA FUND CWA-PS
 SHAWNEE N.F.
 HARRISBURG                       IL

 IL-122307774 PROJECT:  0908000332
 LEE MINES CAP SHAFTS
 ACCT: 23 SWA FUND CWA-PS
 SHAWNEE N.F.
 HARRISBURG                       IL

 IL-122314793 PROJECT:  2313090007
 ASBESTOS SURVEY
 ACCT:  27 SWA FUND TSCA
 F.S.L.  CARBONDALE
 CARBONDALE                        IL

 IL-122314793 PROJECT:  2313090012
 ASBESTOS ABATEMENT/REMOVAL
 ACCT:  27 SWA FUND  TSCA
 F.S.L.  CARBONDALE
 CARBONDALE                        IL

 IN-122307769 PROJECT:  0911020231
 512 ROADSIDE  DUMPS
 ACCT:  12 DEPT FUND RCRA
 WAYNE-HOOSIER N.F.
 BEDFORD                           IH

 IN-122307769  PROJECT:  0911000319
 ABANDONED OIL AND GAS  WELLS PLUS
ACCT: 23 SWA  FUND CWA-PS
WAYNE-HOOSIER N.F.
BEDFORD                           IN
                                                        15.0  ESRE   92/09  91/12 MEDIUM   WATER
        8.0   OTHR   87/12   90/12 MEDIUM   WATER
                                                  ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
                                                  ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
             PSDF    00/01  90/09 MEDIUM   TOXIC      NOT       NOT
                                       SUBSTANCE   AVAIL     AVAIL
       15.0   PSDF   00/01  90/10 MEDIUM   TOXIC      NOT       NOT
                                       SUBSTANCE   AVAIL     AVAIL
      32.0  ESDP   66/10  90/09  HIGH
      8<+.9  ESDP   87/12  90/12  HIGH
                                         SOLID
                                         WASTE
                                         WATER
 NOT
AVAIL
                                                    NOT
                                                   AVAIL
 NOT
AVAIL
           NOT
          AVAIL
                      NOT
                     AVAIL
                      NOT
                     AVAIL
 NOT
AVAIL
            NOT
           AVAIL

-------
                                 FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                         DEPARTMENT OF AGRICULTURE               FOREST SERVICE
                PROJECT IDENTIFICATION
                     REQ    EST   PROJECT
  BUDGET     COMPL   COMPL  COMPL ASSESS-  MEDIA
(THOUSANDS)  STATUS  DATE   DATE  MENT     TYPE
                                                                     USDA-68
   ADEQUACY OF PROJECT
 ENGIN-
 EERING    TIME      COST
KY-122307683 PROJECT: 0802120001
FRENCHBURG CCC SEWAGE TREATMENT PLANT
ACCT: 23 SWA FUND CWA-PS
DANIEL BOONE NF
WINCHESTER                       KY

KY-122307683 PROJECT: 0802120021
KOOMER RIDGE TOILETS
ACCT: 23 SWA FUND CWA-PS
DANIEL BOONE NF
WINCHESTER                       KY

KY-122307683 PROJECT: 0802120023
SKY BRIDGE TOILETS
ACCT: 23 SWA FUND CWA-PS
DANIEL BOONE NF
WINCHESTER                       KY

KY-122307683 PROJECT: 0802130026
S-TREE TOILET REHABILITATION
ACCT: 23 SWA FUND CWA-PS
DANIEL BOONE NF
WINCHESTER                       KY

LA-122307721 PROJECT: 0806000118
ALEXANDRIA FORESTRY CENTER
ACCT: 27 SWA FUND TSCA
KISATCHIE NATIONAL FOREST
PINEVILLE                        LA

LA-122307721 PROJECT: 0806010119
CATAHOULA W.C.
ACCT: 27 SWA FUND TSCA
KISATCHIE NATIONAL FOREST
PINEVILLE                        LA
       25.0  INOV   80/12  91/09  HIGH     WATER    ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
      160.0  ESDP   00/01   91/01  MEDIUM    WATER    ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
       70.0  ESDP   77/12   91/01   HIGH    WATER    ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
        5.0  ESRO   92/09  93/06  MEDIUM   WATER
      498.6   PSDF    95/12   90/09  HIGH     AIR
 NOT       NOT        NOT
AVAIL     AVAIL      AVAIL
                                                  ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
        2.0   ESRO   92/10  91/09  LOW   PESTICIDES ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE

-------
                                  FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                          DEPARTMENT  OF  AGRICULTURE               FOREST SERVICE
                 PROJECT IDENTIFICATION
                     REQ     EST    PROJECT
  BUDGET     COMPL    COMPL   COMPL  ASSESS- MEDIA
(THOUSANDS)   STATUS   DATE    DATE   MENT    TYPE
                                                                     USDA-69
   ADEQUACY OF PROJECT
 ENGIN-
 EERING    TIME      COST
 LA-122307721 PROJECT:  0806040114
 CLOUD CROSSING R.A.
 ACCT: 23 SWA FUND  CMA-PS
 KISATCHIE NATIONAL FOREST
 PINEVILLE                        LA

 ME-122307692 PROJECT:  2406000007
 PENOBSCOT UST REMOVAL-1
 ACCT: 12 DEPT FUND RCRA
 PENOBSCOT EXPERIMENTAL FOREST
 BRADLEY                          ME

 ME-122307692 PROJECT:  2406000008
 PENOBSCOT UST REMOVAL-2
 ACCT:  12 DEPT FUND  RCRA
 PENOBSCOT EXPERIMENTAL FOREST
 BRADLEY                          ME

 MI-122307770 PROJECT: 0904000103
 DUMP  SITES CLEAN-UP PESTICIDE & HERBICIDE
 ACCT:  11  DEPT FUND CERCLA
 HURON-MANISTEE N.F.
 CADILLAC                         MI

 MI-122307770  PROJECT: 0904000108
 DUMP SITES THROUGHOUT FOREST
 ACCT:  11  DEPT  FUND CERCLA
 HURON-MANISTEE N.F.
 CADILLAC                         MI

MI-122307770  PROJECT: 0904000232
DUMP SITES
ACCT:  12 DEPT FUND RCRA
HURON-MANISTEE N.F.
CADILLAC                         MI
                                                        2.0  ESDP   79/12  92/06 MEDIUM   WATER
                                                  ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
        5.0   ESDF   89/12  91/01  HIGH
        2.5   ESDF   89/12  91/01  HIGH
        3.0   ESDP   86/10  90/09  HIGH
       12.0   ESDP   86/10  90/09  HIGH
       32.0  ESDP   90/12  91/12  HIGH
                                         SOLID
                                         WASTE
                                         SOLID
                                         WASTE
                                         CERCLA
                                         CERCLA
                                         SOLID
                                         WASTE
 NOT
AVAIL
 NOT
AVAIL
                                                    NOT
                                                   AVAIL
                                                    NOT
                                                   AVAIL
 NOT
AVAIL
 NOT
AVAIL
 NOT
AVAIL
           NOT
          AVAIL
           NOT
          AVAIL
 NOT
AVAIL
 NOT
AVAIL
 NOT
AVAIL
            NOT
           AVAIL
            NOT
           AVAIL
 NOT
AVAIL

-------
                                 FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                         DEPARTMENT OF AGRICULTURE               FOREST SERVICE
                PROJECT IDENTIFICATION
                     REQ    EST   PROJECT
  BUDGET     COMPL   COMPL  COMPL ASSESS-  MEDIA
(THOUSANDS)   STATUS  DATE   DATE   MENT    TYPE
                                                                                                                     USDA-70
  ADEQUACY OF PROJECT
ENGIN-
EERING    TIME      COST
MI-122307770 PROJECT: 0904040209
CHEMICAL WASTE
ACCT: 12 DEPT FUND RCRA
HURON-MANISTEE N.F.
CADILLAC                         MI

MI-122307773 PROJECT: 0907060208
WATERSMEET SLF
ACCT: 12 DEPT FUND RCRA
OTTAWA N.F.
IRONWOOD                         MI

MI-122307776 PROJECT: 0910030204
MUNSIN6 CITY SLF
ACCT: 12 DEPT FUND RCRA
HIAWATHA N.F.
ESCANABA                         MI

MI-122307776 PROJECT: 0910040324
RACO WW TREATMENT PLANT
ACCT: 23 SWA FUND CWA-PS
HIAWATHA N.F.
ESCANABA                         MI

MI-122314795 PROJECT: 2313050006
ABESTOS SURVEY
ACCT: 27 SWA FUND TSCA
F.S.L. HOUGHTON
HOUGHTON                         MI

MI-122314795 PROJECT: 2313050011
ABESTOS ABATEMENT/REMOVAL
ACCT: 27 SWA FUND TSCA
F.S.L. HOUGHTON
HOUGHTON                         MI
        3.0  ESDP   90/09  90/09   HIGH    SOLID    ADEQUATE  ADEQUATE   ADEQUATE
                                         WASTE     DESIGN    TIMING    ESTIMATE
      200.0  INOV   S6/10   90/09  HIGH    SOLID    ADEQUATE  ADEQUATE   ADEQUATE
                                         WASTE     DESIGN    TIMING    ESTIMATE
    1,600.0  ESDP   86/10   90/09  HIGH    SOLID    ADEQUATE  ADEQUATE   ADEQUATE
                                         WASTE     DESIGN    TIMING    ESTIMATE
       38.0  ESDP   87/12   90/12  HIGH    WATER    ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
        3.0  PSDF   00/01   90/09 MEDIUM   TOXIC      NOT       NOT        NOT
                                       SUBSTANCE   AVAIL     AVAIL      AVAIL
       10.0  PSDF   00/01   90/10 MEDIUM   TOXIC      NOT       NOT        NOT
                                       SUBSTANCE   AVAIL     AVAIL      AVAIL

-------
                                  FEDERAL AGENCY  POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                          DEPARTMENT OF  AGRICULTURE               FOREST SERVICE
                                                                     USDA-71
                 PROJECT IDENTIFICATION
                     REQ    EST    PROJECT
  BUDGET     COMPL   COMPL   COMPL  ASSESS- MEDIA
(THOUSANDS)   STATUS  DATE    DATE   MENT    TYPE
  ADEQUACY OF PROJECT
ENGIN-
EERING    TIME      COST
 MN-122307766 PROJECT:  0903000521
 ABANDONED WATER WELLS
 ACCT: 25 SWA FUND SDWA
 CHIPPEWA NATIONAL FOREST
 CASS LAKE
                                 MN
 MN-122307766 PROJECT:  0903020503
 NORWAY BEACH REC  AREA  - REPLACE WATER SYST
 ACCT:  25 SWA FUND SDWA
 CHIPPEWA NATIONAL FOREST
 CASS LAKE                       MN

 MN-122307766 PROJECT:  0903030309
 CUT  FOOT SIOUX C.D.
 ACCT:  23 SWA FUND  CWA-PS
 CHIPPEWA NATIONAL  FOREST
 CASS LAKE                       MN

 MN-122307766 PROJECT:  0903050308
 STONY  POINT  CAMPGROUND
 ACCT:  23 SWA FUND  CWA-PS
 CHIPPEWA NATIONAL  FOREST
 CASS LAKE                        MN

 MN-122307766  PROJECT:  0903050313
 STONY  POINT  CAMPGROUND CATHODE
 ACCT:  23  SWA  FUND  CWA-PS
 CHIPPEWA  NATIONAL  FOREST
CASS LAKE                        MN

MN-122307766  PROJECT: 0903020312
WANAKI CAMPGROUND
ACCT: 23 SWA  FUND CWA-PS
CHIPPEWA NATIONAL  FOREST
CASS LAKE                        MN
        2.0  ESDP   86/09   90/09  HIGH   DRINKING  ADEQUATE  ADEQUATE   ADEQUATE
                                         WATER     DESIGN    TIMING    ESTIMATE
       10.0   ESDF    92/09   91/09 MEDIUM  DRINKING  ADEQUATE  ADEQUATE   ADEQUATE
                                         WATER     DESIGN    TIMING    ESTIMATE
        3.0   ESRO    92/09   91/09  HIGH   DRINKING  ADEQUATE  ADEQUATE   ADEQUATE
                                         WATER     DESIGN    TIMING    ESTIMATE
        2.0   ESRO    92/09   91/09  HIGH   DRINKING  ADEQUATE  ADEQUATE   ADEQUATE
                                         WATER     DESIGN    TIMING    ESTIMATE
         .0   ESRO    91/09   90/12  HIGH   DRINKING  ADEQUATE  ADEQUATE   ADEQUATE
                                         WATER     DESIGN    TIMING    ESTIMATE
       3.0  ESRO   91/09  90/09  HIGH   DRINKING  ADEQUATE  ADEQUATE   ADEQUATE
                                         WATER     DESIGN    TIMING    ESTIMATE

-------
                                 FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                         DEPARTMENT OF AGRICULTURE               FOREST SERVICE
                PROJECT IDENTIFICATION
                                    REQ    EST   PROJECT
                 BUDGET     COMPL   COMPL  COMPL ASSESS- MEDIA
               (THOUSANDS)  STATUS  DATE   DATE  MENT    TYPE
                                                                                     USDA-72
  ADEQUACY OF PROJECT
ENGIN-
EERING    TIME      COST
MN-122307766 PROJECT: 0903000512
CAMPGROUND WELLS *3
ACCT: 25 SWA FUND SDWA
CHIPPEWA NATIONAL FOREST
CASS LAKE
MN
MN-122307766 PROJECT: 0903000510
CAMPGROUND WELLS *1 - WELL SCREENS
ACCT: 25 SWA FUND SDWA
CHIPPEWA NATIONAL FOREST
CASS LAKE                        MN

MN-122307766 PROJECT: 0903000511
CAMPGROUND WELLS *2 WELL SCREEN
ACCT: 25 SWA FUND SDWA
CHIPPEWA NATIONAL FOREST
CASS LAKE                        MN

MN-122307766 PROJECT: 0903010300
BLACKDUCK ADMIN SITE
ACCT: 25 SWA FUND SDWA
CHIPFEWA NATIONAL FOREST
CASS LAKE                        MN

MN-122307766 PROJECT: 0903020307
NORWAY BEACH CENTRAL DISPOSAL
ACCT: 23 SWA FUND CWA-PS
CHIPPEWA NATIONAL FOREST
CASS LAKE                        MN

MN-122307766 PROJECT: 0903020306
NORWAY BEACH CENTRAL DISPOSAL
ACCT: 23 SWA FUND CWA-PS
CHIPPEWA NATIONAL FOREST
CASS LAKE                        MN
                       9.0  ESRO   91/09  90/12 MEDIUM  DRINKING    NOT       NOT        NOT
                                                         WATER     AVAIL     AVAIL      AVAIL
                      17.5  ESRO   91/09  90/12  HIGH   DRINKING  ADEQUATE  ADEQUATE    ADEQUATE
                                                         WATER     DESIGN    TIMING    ESTIMATE
                       8.0  ESRO   91/09  90/12 MEDIUM  DRINKING  ADEQUATE   ADEQUATE   ADEQUATE
                                                         WATER     DESIGN    TIMING    ESTIMATE
                       0.5  OTHR   92/09  90/12 MEDIUM  DRINKING    NOT       NOT        NOT
                                                         WATER      AVAIL     AVAIL      AVAIL
                       3.0  ESDP   87/12  91/09  HIGH    WATER     ADEQUATE  ADEQUATE   ADEQUATE
                                                                   DESIGN    TIMING    ESTIMATE
                       3.0  ESRO   91/09  91/09 MEDIUM    WATER    ADEQUATE  ADEQUATE   ADEQUATE
                                                                  DESIGN    TIMING    ESTIMATE

-------
                                  FEDERAL AGENCY  POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                          DEPARTMENT OF AGRICULTURE               FOREST SERVICE
                 PROJECT IDENTIFICATION
                     REQ     EST   PROJECT
  BUDGET     COMPL    COMPL   COMPL ASSESS- MEDIA
(THOUSANDS)   STATUS   DATE    DATE  MENT    TYPE
                                                                                                                      USDA-73
    ADEQUACY OF PROJECT
  ENGIN-
  EERING    TIME      COST
 MN-122307775 PROJECT:  0909000509
 TEST WATER SUPPLIES
 ACCT: 25 SWA FUND SDWA
 SUPERIOR N.F.
 DULUTH                           MN

 MN-122307775 PROJECT:  0909000506
 UPGRADE SPRINGS
 ACCT: 25 SWA FUND SDWA
 SUPERIOR N.F.
 DULUTH                           MN

 MN-122307775 PROJECT:  0909000533
 WATER SUPPLY WELLS  - FILTER SYSTEM
 ACCT:  25 SWA FUND SDWA
 SUPERIOR N.F.
 DULUTH                            MN

 MN-122307775 PROJECT:  0909050202
 NORTHWOODS SLF
 ACCT:  12  DEPT FUND  RCRA
 SUPERIOR  N.F.
 DULUTH                            MN

 MN-122307775 PROJECT:  0909070203
 TOFTE SLF
 ACCT: 12  DEPT FUND  RCRA
 SUPERIOR  N.F.
 DULUTH                            MN

MN-122307775 PROJECT:  0909040316
ENVIR LEARN  CENTER  SEWER SYSTEM
ACCT: 23  SWA FUND CWA-PS
SUPERIOR N.F.
DULUTH                           MN
       25.0   ESDP    86/12   90/12  HIGH   DRINKING  ADEQUATE  ADEQUATE   ADEQUATE
                                         WATER     DESIGN    TIMING    ESTIMATE
       10.0   PSDF    90/12  90/09 MEDIUM  DRINKING    NOT       NOT        NOT
                                         WATER     AVAIL     AVAIL      AVAIL
       25.0  OTHR    92/09  90/09 MEDIUM  DRINKING    NOT       NOT        NOT
                                         WATER     AVAIL     AVAIL      AVAIL
       60.0   INOV   86/10  90/09  HIGH    SOLID      NOT       NOT        NOT
                                         WASTE     AVAIL     AVAIL      AVAIL
      350.0  ESDP   86/10  90/09  HIGH    SOLID
                                         WASTE
      160.0  OTHR   91/09  90/09 MEDIUM   WATER
ADEQUATE  ADEQUATE   ADEQUATE
 DESIGN    TIMING    ESTIMATE
                                                  ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE

-------
                                 FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                         DEPARTMENT OF AGRICULTURE               FOREST SERVICE
                PROJECT IDENTIFICATION
                     REQ    EST   PROJECT
  BUDGET     COMPL   COMPL  COMPL ASSESS- MEDIA
(THOUSANDS)  STATUS  DATE   DATE  MENT    TYPE
                                                                     USDA-74
   ADEQUACY OF PROJECT
 ENGIN-
 EERING    TIME      COST
MN-122307775 PROJECT: 0909040315
ISABELLA ADMIN SEWAGE SYSTEM
ACCT: 23 SWA FUND CWA-PS
SUPERIOR N.F.
DULUTH                           MN

MN-122307775 PROJECT: 0909000339
VAULT TOILETS WATERTIGHTNESS
ACCT: 23 SWA FUND CWA-PS
SUPERIOR N.F.
DULUTH                           MN

MN-122314796 PROJECT: 2313020005
ASBESTOS SURVEY
ACCT: 27 SWA FUND TSCA
F.S.L. GRAND RAPIDS
GRAND RAPIDS                     MN

MN-122314796 PROJECT: 2313020010
ASBESTOS ABATEMENT/REMOVAL
ACCT: 27 SWA FUND TSCA
F.S.L. GRAND RAPIDS
GRAND RAPIDS                     MN

MN-122314796 PROJECT: 2313200003
ASBESTOS SURVEY
ACCT: 27 SWA FUND TSCA
F.S.L. GRAND RAPIDS
GRAND RAPIDS                     MN

MN-122314796 PROJECT: 2313200008
ASBESTOS ABATEMENT/REMOVAL
ACCT: 27 SWA FUND TSCA
F.S.L. GRAND RAPIDS
GRAND RAPIDS                     MN
       30.0  OTHR   91/09  90/12 MEDIUM   WATER
      100.0  OTHR   92/09  90/12 MEDIUM   WATER
        3.0  PSDF   00/01   90/09 MEDIUM   TOXIC
                                        SUBSTANCE
       10.0  PSDF   00/01   90/10  MEDIUM   TOXIC
                                        SUBSTANCE
        4.0  PSDF    00/01   90/09  MEDIUM   TOXIC
                                       SUBSTANCE
       20.0  PSDF    00/01   90/10 MEDIUM   TOXIC
                                       SUBSTANCE
                                                    NOT
                                                   AVAIL
                                                    NOT
                                                   AVAIL
 NOT
AVAIL
 NOT
AVAIL
 NOT
AVAIL
 NOT
AVAIL
           NOT
          AVAIL
           NOT
          AVAIL
 NOT
AVAIL
 NOT
AVAIL
 NOT
AVAIL
 NOT
AVAIL
            NOT
           AVAIL
            NOT
           AVAIL
 NOT
AVAIL
 NOT
AVAIL
 NOT
AVAIL
 NOT
AVAIL

-------
                                  FEDERAL AGENCY POLLUTION ABATEMENT  PLAN  FOR  FISCAL YEAR  1991

                          DEPARTMENT OF AGRICULTURE                FOREST SERVICE
                 PROJECT IDENTIFICATION
                     REQ    EST    PROJECT
  BUDGET     COMPL   COMPL   COMPL  ASSESS- MEDIA
(THOUSANDS)   STATUS  DATE    DATE   MENT    TYPE
                                                                     USDA-75
    ADEQUACY OF PROJECT
  ENGIN-
  EERING    TIME      COST
 MO-122307767 PROJECT: 0905000508
 MARKHAM SPRINGS CAMPGROUND - REHABILITATE
 ACCT: 25 SWA FUND SDWA
 MARK TWAIN NF
 ROLLA                            MO

 MO-122307767 PROJECT: 0905000318
 ABANDONED  WELLS AND  CISTERNS
 ACCT: 23 SWA FUND CWA-PS
 MARK TWAIN NF
 ROLLA                            MO

 MS-122313980 PROJECT: 3019200007
 REMOVE  ABANDONED  UST'S AT  HARRISON  EF
 ACCT:  12 DEPT FUND RCRA
 SOUTHERN STATION
 NEW  ORLEANS                      MS

 MS-122313980 PROJECT:  3019200006
 REMOVE  DETERIORATED  ASBESTOS 3 HARRISON EF
 ACCT: 27 SWA FUND TSCA
 SOUTHERN STATION
 NEW  ORLEANS                      MS

 MT-122307481  PROJECT:  0100000008
 ASBESTOS MONITORING  -  MONTANA
 ACCT: 27 SWA FUND TSCA
 LOLO NF
 MISSOULA                         MT

 MT-122307484  PROJECT:  0110010857
 HOLLAND  LAKE  CG PORTABLE WATER
 ACCT: 25 SWA  FUND SDWA
 FLATHEAD NF
KALISPELL                        MT
       75.0   ESDP   90/12   90/12  HIGH   DRINKING  ADEQUATE  ADEQUATE   ADEQUATE
                                         WATER     DESIGN    TIMING    ESTIMATE
       10.0   OTHR    92/09   90/12 MEDIUM   WATER
       27.0   ESOF    11/01  91/04  HIGH    SOLID
                                         WASTE
                                                    NOT       NOT
                                                   AVAIL     AVAIL
      150.0  PSDF   00/01  93/09 MEDIUM
                                          AIR
                                                    NOT
                                                   AVAIL
       13.0  PSDF   90/12  90/09 MEDIUM  DRINKING    NOT
                                         WATER     AVAIL
            NOT
           AVAIL
            NOT
           AVAIL
                       NOT
                      AVAIL
ADEQUATE  ADEQUATE   ADEQUATE
 DESIGN    TIMING    ESTIMATE
       11.0   ESDF    11/01  91/06  HIGH    TOXIC    ADEQUATE  ADEQUATE   ADEQUATE
                                       SUBSTANCE   DESIGN    TIMING    ESTIMATE
 NOT
AVAIL
 NOT
AVAIL

-------
                                 FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                         DEPARTMENT OF AGRICULTURE               FOREST SERVICE
                PROJECT IDENTIFICATION
                                    REQ    EST   PROJECT
                 BUDGET     COMPL   COMPL  COMPL ASSESS- MEDIA
               (THOUSANDS)  STATUS  DATE   DATE  MENT    TYPE
                                                                                     USDA-76
  ADEQUACY OF PROJECT
ENGIN-
EERING    TIME      COST
MT-122307484 PROJECT: 0110060888
MURRAY BAY CG PORTABLE WATER
ACCT: 25 SWA FUND SDWA
FLATHEAD NF
KALISPELL                        MT

MT-122307484 PROJECT: 0110060958
LOST JOHNNY POINT CG POTABLE WATER
ACCT: 25 SWA FUND SDWA
FLATHEAD NF
KALISPELL                        MT
MT-122307484 PROJECT: 0110072011
BIS CREEK WC UST
ACCT: 12 DEPT FUND RCRA
FLATHEAD NF
KALISPELL
MT-122307500 PROJECT: 0114042031
SYLVANITE WC UST
ACCT: 12 DEPT FUND RCRA
KOOTENAI NF
LIBBY
MT
MT
MT-122307503 PROJECT: 0151929511
REGIONAL FIELD SERVICE FACILITY UST
ACCT: 12 DEPT FUND RCRA
USFS NORTHERN REGION
MISSOULA                         MT

MT-122399999 PROJECT: 0100000006
FLAMMABLE STORAGE - REGION-WIDE
ACCT: 12 DEPT FUND RCRA
USFS NORTHERN REGION
MISSOULA                         MT
                      35.0  PSDF   90/12  90/09 MEDIUM  DRINKING    NOT       NOT        NOT
                                                         WATER     AVAIL     AVAIL      AVAIL
                      35.0  PSDF   90/12  90/09 MEDIUM  DRINKING    NOT       NOT        NOT
                                                         WATER     AVAIL     AVAIL      AVAIL
                      10.0  ESDF   90/12  90/09 MEDIUM   SOLID      NOT       NOT        NOT
                                                         WASTE     AVAIL     AVAIL     AVAIL
                      25.0  ESDF   91/12  91/05 MEDIUM   SOLID      NOT        NOT        NOT
                                                         WASTE     AVAIL     AVAIL      AVAIL
                      10.0  ESDF   91/12  91/05 MEDIUM   SOLID       NOT       NOT        NOT
                                                         WASTE      AVAIL     AVAIL      AVAIL
                     300.0  ESDP   88/12  91/04  HIGH     SOLID      NOT       NOT        NOT
                                                         WASTE     AVAIL     AVAIL      AVAIL

-------
                                  FEDERAL  AGENCY  POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                          DEPARTMENT  OF  AGRICULTURE               FOREST SERVICE
                 PROJECT IDENTIFICATION
                     REQ     EST   PROJECT
  BUDGET     COMPL    COMPL   CCMPL ASSESS- MEDIA
(THOUSANDS)   STATUS   DATE    DATE  MENT    TYPE
                                                                                                                      USDA-77
   ADEQUACY OF PROJECT
 ENGIN-
 EERING    TIME      COST
 MT-122399999 PROJECT:  010000000-+
 HAZARDOUS WASTE CLEANUP -  MONTANA
 ACCT:  12 DEPT FUND RCRA
 USFS NORTHERN REGION
 MISSOULA                        MT

 MT-122399999 PROJECT:  0100000005
 HAZARDOUS WASTE CLEANUP -  IDAHO
 ACCT:  12 DEPT FUND RCRA
 USFS NORTHERN REGION
 MISSOULA                        MT

 NC-122307723 PROJECT:  0811080003
 SPIVY  REC.  AREA WATER  SYSTEM - TOEACANE
 ACCT:  25 SWA FUND  SDWA
 NFS, NC
 ASHEVILLE                        NC

 NC-122307723 PROJECT:  0811070005
 N. MILLS RIVER  CG  SEWAGE TREAT. PLANT REHAB.
 ACCT:  23 SWA FUND  CWA-PS
 NFS, NC
 ASHEVILLE                        NC

 NC-122307723  PROJECT:  0811070003
 LAKE POWHATAN SEWAGE TREAT. PLANT - PISGAH
 ACCT:  23 SWA  FUND  CWA-PS
 NFS, NC
 ASHEVILLE                        NC

NC-122307723  PROJECT:  0811070004
 LAKE POWHATAN CG SEWAGE TREAT. PLANT REHAB.
ACCT:  23 SWA  FUND CWA-PS
NFS, NC
ASHEVILLE                        NC
                                                       50.0  ESDP   87/12  90/09  HIGH
       50.0   ESDP    87/12   90/09  HIGH
                                         SOLID
                                         WASTE
                                         SOLID
                                         WASTE
 NOT
AVAIL
 NOT
AVAIL
 NOT
AVAIL
 NOT
AVAIL
       16.0   ESDP   86/12  91/04  HIGH   DRINKING  ADEQUATE  ADEQUATE
                                         WATER     DESIGN    TIMING
       25.0   INOV   87/12   91/04  HIGH    WATER
       6.0   INOV   67/12  91/04  HIGH    WATER
       12.5   INOV   87/12  91/04  HIGH    WATER
                                                    NOT       NOT
                                                   AVAIL     AVAIL
                                                  ADEQUATE  ADEQUATE
                                                   DESIGN    TIMING
                                                    NOT       NOT
                                                   AVAIL     AVAIL
 NOT
AVAIL
 NOT
AVAIL
                    ADEQUATE
                    ESTIMATE
                      NOT
                     AVAIL
                    ADEQUATE
                    ESTIMATE
                      NOT
                     AVAIL

-------
                                 FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                         DEPARTMENT OF AGRICULTURE               FOREST SERVICE
                PROJECT IDENTIFICATION
                     REQ    EST   PROJECT
  BUDGET     COMPL   COMPL  COMPL ASSESS- MEDIA
(THOUSANDS)  STATUS  DATE   DATE  MENT    TYPE
                                                                                                                      USDA-78
  ADEQUACY OF PROJECT
ENGIN-
EERING    TIME      COST
NC-122307723 PROJECT: 0811030002
CEDAR POINT C.G. PIT TOILETS - CROATAN
ACCT: 23 SWA FUND CWA-PS
NFS, NC
ASHEVILLE                        NC

NC-122313972 PROJECT: 2918000002
STATION-WIDE LEAD WATER FOUTAIN REPLACEMENT
ACCT: 25 SWA FUND SDWA
SOUTHEASTERN STATION
ASHEVILLE                        NC

NE-122307524 PROJECT: 0207000001
CHEMICAL DUMP SITE NO. 1
ACCT: 11 DEPT FUND CERCLA
NEBRASKA NF
CHADRON                          NE

NE-122307524 PROJECT: 0207000002
CHEMICAL DUMP SITE NO. 2
ACCT: 11 DEPT FUND CERCLA
NEBRASKA NF
CHADRON                          NE

NH-122307679 PROJECT: 0922050801
ASBESTOS BOILER -BARTLETT
ACCT: 28 SWA FUND CAA
WHITE MOUNTAIN N.F.
LACONIA                          NH

NH-122307679 PROJECT: 0922050300
FOREST LAGOON
ACCT: 23 SWA FUND CWA-PS
WHITE MOUNTAIN N.F.
LACONIA                          NH
       80.0  ESDP   87/12  91/04  HIGH     WATER       NOT       NOT
                                                    AVAIL     AVAIL
                     NOT
                    AVAIL
       12.0  ESDF   11/01  90/11   HIGH    DRINKING  ADEQUATE  ADEQUATE   ADEQUATE
                                          WATER      DESIGN    TIMING    ESTIMATE
       40.0  ESDP   86/10  90/09  HIGH     CERCLA    ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
       40.0  ESDP   86/10  90/09  HIGH     CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
        5.0  ESDP   93/09  90/09   HIGH    TOXIC      NOT       NOT        NOT
                                        SUBSTANCE   AVAIL     AVAIL      AVAIL
       30.0  OTHR   89/12   90/09  MEDIUM   WATER      NOT       NOT        NOT
                                                   AVAIL     AVAIL      AVAIL

-------
                                  FEDERAL AGENCY POLLUTION  ABATEMENT PLAN FOR FISCAL YEAR 1991

                          DEPARTMENT OF AGRICULTURE                FOREST SERVICE
                 PROJECT IDENTIFICATION
                     REG)     EST    PROJECT
  BUDGET     COMPL   COMPL   COMPL  ASSESS- MEDIA
(THOUSANDS)   STATUS  DATE    DATE   MENT    TYPE
                                                                     USDA-79
   ADEQUACY OF PROJECT
 ENGIN-
 EERING    TIME      COST
 NH-122307679 PROJECT: 0922040302
 RUSSEL POND
 ACCT: 23 SWA FUND CWA-PS
 WHITE MOUNTAIN N.F.
 LACONIA                          NH

 NH-122319597 PROJECT: 2406000005
 HUBBARD BROOK UST REMOVAL
 ACCT: 12 DEPT FUND RCRA
 LOUIS C WYMAN FOR SCIENCES  LAB
 DURHAM                           NH

 NH-122319597 PROJECT:  2406000006
 LOUIS C WYMAN UST REMOVAL
 ACCT:  12  DEPT FUND RCRA
 LOUIS C WYMAN FOR SCIENCES  LAB
 DURHAM                           NH

 NM-122300000  PROJECT:  0300000123
 NM PUBLIC WATER SYSTEMS VOC TESTS
 ACCT:  25 SWA  FUND  SDWA
 USDA  FOREST  SERVICE
 ALBUQUERQUE                       NM

 NM-122307547  PROJECT:  0302010136
 CANJILON ADMIN SITE WATER SYSTEM
 ACCT:  25 SWA  FUND  SDWA
 CARSON
 TAOS                              NM

 NM-122307547  PROJECT: 0302040134
 SANTA BARBARA CAMPGROUND WATER SYSTEM
ACCT: 25 SWA  FUND SDWA
CARSON
TAOS                              NM
        4.0  OTHR    92/12   90/12 MEDIUM   WATER
       10.0   ESRO    91/09   90/10 MEDIUM   SOLID
                                         WASTE
                                                    NOT
                                                   AVAIL
 NOT
AVAIL
           NOT
          AVAIL
 NOT
AVAIL
        8.0   ESRO    91/09   90/10 MEDIUM   SOLID      NOT       NOT
                                         WASTE     AVAIL     AVAIL
       22.0   PSDF   90/12  90/11 MEDIUM  DRINKING    NOT       NOT
                                         WATER     AVAIL     AVAIL
            NOT
           AVAIL
 NOT
AVAIL
                      NOT
                     AVAIL
                      NOT
                     AVAIL
       5.5  ESDP   74/12  91/03  HIGH   DRINKING  ADEQUATE  ADEQUATE   ADEQUATE
                                         WATER     DESIGN    TIMING    ESTIMATE
       5.0  PSDF   90/12  91/03 MEDIUM  DRINKING  ADEQUATE  ADEQUATE   ADEQUATE
                                         WATER     DESIGN    TIMING    ESTIMATE

-------
                                 FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                         DEPARTMENT OF AGRICULTURE               FOREST SERVICE
                PROJECT IDENTIFICATION
                     REQ    EST   PROJECT
  BUDGET     COMPL   COMPL  COMPL ASSESS- MEDIA
(THOUSANDS)  STATUS  DATE   DATE  MENT    TYPE
                                                                      USDA-80
  ADEQUACY OF PROJECT
ENGIN-
EERING    TIME      COST
NM-122307547 PROJECT: 0302060129
TRES PIEDRAS ADMIN WATER SYSTEM
ACCT: 25 SWA FUND SDWA
CARSON
TAOS                             NM

NM-122307547 PROJECT: 0302060131
LAGUNITAS CAMPGROUND WATER SYSTEM
ACCT: 25 SWA FUND SDWA
CARSON
TAOS                             NM

NM-122307547 PROJECT: 0302070133
FAWN LAKES CAMPGROUND WATER SYSTEM
ACCT: 25 SWA FUND SDWA
CARSON
TAOS                             NM

NM-122307547 PROJECT: 0302070137
MCCRYSTAL CAMPGROUND WATER SYSTEM
ACCT: 25 SWA FUND SDWA
CARSON
TAOS                             NM

NM-122307547 PROJECT: 0302070138
COLUMBINE CAMPGROUND WATER SYSTEM
ACCT: 25 SWA FUND SDWA
CARSON
TAOS                             NM

NM-122307547 PROJECT: 0302030130
BUBBLING SPRING
ACCT: 25 SWA FUND SDWA
CARSON
TAOS                             NM
        6.5  ESRO   91/10  91/03 MEDIUM  DRINKING  ADEQUATE  ADEQUATE    ADEQUATE
                                          WATER     DESIGN    TIMING    ESTIMATE
         .1  ESRO   91/10  91/03 MEDIUM  DRINKING  ADEQUATE   ADEQUATE    ADEQUATE
                                          WATER      DESIGN    TIMING     ESTIMATE
        1.5  ESRO   91/10  91/03 MEDIUM  DRINKING  ADEQUATE   ADEQUATE   ADEQUATE
                                          WATER      DESIGN    TIMING    ESTIMATE
        5.0  ESRO   92/10  91/03 MEDIUM  DRINKING  ADEQUATE  ADEQUATE   ADEQUATE
                                          WATER     DESIGN    TIMING    ESTIMATE
        1.0  ESRO   91/10  91/03 MEDIUM  DRINKING   ADEQUATE  ADEQUATE   ADEQUATE
                                          WATER     DESIGN    TIMING    ESTIMATE
        9.0   ESRO   91/10   91/03  MEDIUM  DRINKING  ADEQUATE  ADEQUATE   ADEQUATE
                                          WATER     DESIGN    TIMING    ESTIMATE

-------
                                  FEDERAL AGENCY  POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                          DEPARTMENT OF  AGRICULTURE               FOREST SERVICE
                 PROJECT IDENTIFICATION
                     REQ     EST    PROJECT
  BUDGET     COMPL    COMPL   COMPL  ASSESS- MEDIA
(THOUSANDS)   STATUS   DATE    DATE   MENT    TYPE
                                                                                                                      USDA-81
  ADEQUACY OF PROJECT
ENGIN-
EERING    TIME      COST
 NM-122307547 PROJECT:  0302010135
 CANJILON CAMPGROUND WATER  SYSTEM
 ACCT: 25 SWA FUND SDWA
 CARSON
 TAOS                            NM

 NM-122307547 PROJECT:  0302000205
 PESTICIDE STORAGE FAC.
 ACCT: 26 SWA FUND FIFRA
 CARSON
 TAOS                            NM

 NM-122307548 PROJECT:  0306030165
 PUEBLO PARK  SPRING
 ACCT:  25 SWA FUND SDHA
 GILA
 SILVER  CITY                      NM

 NM-122307548 PROJECT:  0306090172
 QUEMADO  ADMIN SITE WATER SYSTEM
 ACCT:  25  SWA FUND SDWA
 GILA
 SILVER CITY                      NM

 NM-122307551  PROJECT: 0303020143
 COAL  MINE REC. SITE WATER SYSTEM
 ACCT: 25  SWA  FUND SDWA
 CIBOLA NATIONAL FOREST
 ALBUQUERQUE                      NM

NM-122307551  PROJECT: 0303040145
4TH OF JULY REC SITE WATER SYSTEM
ACCT: 25 SWA  FUND SDWA
CIBOLA NATIONAL FOREST
ALBUQUERQUE                      NM
       65.0   ESRO    91/10   91/03 MEDIUM  DRINKING  ADEQUATE  ADEQUATE   ADEQUATE
                                         WATER     DESIGN    TIMING    ESTIMATE
       25.0   ESDP    88/12   91/03  HIGH  PESTICIDES ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
        3.0   ESDP    74/12  91/08   LOW    DRINKING  ADEQUATE  ADEQUATE   ADEQUATE
                                         WATER     DESIGN    TIMING    ESTIMATE
       10.0   PSDF    90/12  91/06 MEDIUM  DRINKING  ADEQUATE  ADEQUATE   ADEQUATE
                                         WATER     DESIGN    TIMING    ESTIMATE
       6.8   ESDP   74/12  91/03 MEDIUM  DRINKING  ADEQUATE  ADEQUATE   ADEQUATE
                                         WATER     DESIGN    TIMING    ESTIMATE
       12.0  ESDP   74/12  91/01  HIGH   DRINKING  ADEQUATE  ADEQUATE   ADEQUATE
                                         WATER     DESIGN    TIMING    ESTIMATE

-------
                                 FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                         DEPARTMENT OF AGRICULTURE               FOREST SERVICE
                PROJECT IDENTIFICATION
                     REQ    EST   PROJECT
  BUDGET     COMPL   COMPL  COMPL ASSESS- MEDIA
(THOUSANDS)  STATUS  DATE   DATE  MENT    TYPE
                                                                                                                      USDA-82
  ADEQUACY OF PROJECT
ENGIN-
EERING    TIME      COST
NM-122307551 PROJECT: 0303040213
RED CANYON REC SITE WATER SYSTEM
ACCT: 25 SWA FUND SDWA
CIBOLA NATIONAL FOREST
ALBUQUERQUE                      NM

NM-122307551 PROJECT: 0303050141
LAS HURTAS PG WATER SYSTEM
ACCT: 25 SWA FUND SDWA
CIBOLA NATIONAL FOREST
ALBUQUERQUE                      NM

NM-122307551 PROJECT: 0303050147
DOC LONG WATER SYSTEM
ACCT: 25 SWA FUND SDWA
CIBOLA NATIONAL FOREST
ALBUQUERQUE                      NM

NM-122307551 PROJECT: 0303020144
MCGAFFEY/QUAKING ASPEN WATER SYSTEM
ACCT: 25 SWA FUND SDWA
CIBOLA NATIONAL FOREST
ALBUQUERQUE                      NM

NM-122307551 PROJECT: 0303040142
J.F KENNEDY WATER SYSTEM
ACCT: 25 SWA FUND SDWA
CIBOLA NATIONAL FOREST
ALBUQUERQUE                      NM

NM-122307551 PROJECT: 0303030113
COBB NUCLEAR MILLSITE
ACCT: 11 DEPT FUND CERCLA
CIBOLA NATIONAL FOREST
ALBUQUERQUE                      NM
       12.0  ESDP   74/12  91/01   HIGH    DRINKING  ADEQUATE   ADEQUATE    ADEQUATE
                                          WATER      DESIGN     TIMING     ESTIMATE
        5.4  ESDP   74/12  91/03 MEDIUM  DRINKING   ADEQUATE  ADEQUATE   ADEQUATE
                                          WATER     DESIGN    TIMING    ESTIMATE
       12.0  PSDF   90/12   91/03 MEDIUM   DRINKING  ADEQUATE  ADEQUATE   ADEQUATE
                                          WATER     DESIGN    TIMING    ESTIMATE
       29.0  PSDF    90/12   91/03  MEDIUM  DRINKING    NOT       NOT        NOT
                                         WATER     AVAIL     AVAIL      AVAIL
        6.2  PSDF   90/12   91/03  MEDIUM  DRINKING  ADEQUATE  ADEQUATE   ADEQUATE
                                         WATER     DESIGN    TIMING    ESTIMATE
       10.0  ESDP   66/10   91/06  HIGH    CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE

-------
                                  FEDERAL AGENCY POLLUTION ABATEMENT  PLAN  FOR FISCAL YEAR 1991

                          DEPARTMENT OF AGRICULTURE                FOREST SERVICE
                 PROJECT IDENTIFICATION
                     REQ    EST    PROJECT
  BUDGET     COMPL   COMPL   COMPL  ASSESS- MEDIA
(THOUSANDS)   STATUS  DATE    DATE   MENT    TYPE
                                                                     USDA-83
  ADEQUACY OF PROJECT
ENGIN-
EERING    TIME      COST
 NM-122307552 PROJECT: 0306080157
 6ILA VISITOR CENTER WATER SYSTEM
 ACCT: 25 SWA FUND SDWA
 GILA
 SILVER CITY                      NM

 NM-122307552 PROJECT: 0306070158
 LITTLE WALNUT PICNIC WATER SYSTEM
 ACCT: 25 SWA FUND SDWA
 GILA
 SILVER CITY                      NM

 NM-122307552 PROJECT:  0306070170
 FT.  BAYARD  ADMIN  SITE WATER  SYSTEM
 ACCT:  25 SWA FUND  SDWA
 SILA
 SILVER  CITY                      NM

 NM-122307552 PROJECT:  0306040156
 WHITETAIL SPRING
 ACCT:  25 SWA FUND  SDWA
 GILA
 SILVER  CITY                      NM

 NM-122307552  PROJECT:  0306020167
 IRON CREEK  CAMPGROUND  WATER  SYSTEM
 ACCT: 25 SWA  FUND  SDWA
 GILA
 SILVER CITY                      NM

NM-122307552  PROJECT:  03060S0160
BLACK MOUNTAIN LOOKOUT WATER SYSTEM
ACCT: 25 SWA  FUND  SDWA
GILA
SILVER CITY                      NM
       15.0   ESDP   74/12   91/09  HIGH   DRINKING  ADEQUATE  ADEQUATE   ADEQUATE
                                         WATER     DESIGN    TIMING    ESTIMATE
        6.0   ESDP    74/12   91/08  MEDIUM  DRINKING  ADEQUATE  ADEQUATE   ADEQUATE
                                         WATER     DESIGN    TIMING    ESTIMATE
        6.0   ESDP    71/12   91/06 MEDIUM  DRINKING  ADEQUATE  ADEQUATE   ADEQUATE
                                         WATER     DESIGN    TIMING    ESTIMATE
        1.0   ESDP    74/12   91/08   LOW    DRINKING  ADEQUATE  ADEQUATE   ADEQUATE
                                         WATER     DESIGN    TIMING    ESTIMATE
       19.0  ESDP    74/12  91/03  HIGH   DRINKING  ADEQUATE  ADEQUATE   ADEQUATE
                                         WATER     DESIGN    TIMING    ESTIMATE
       5.0  ESDF   90/12  91/03  LOW    DRINKING  ADEQUATE  ADEQUATE   ADEQUATE
                                         WATER     DESIGN    TIMING    ESTIMATE

-------
                                 FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                         DEPARTMENT OF AGRICULTURE               FOREST SERVICE
                PROJECT IDENTIFICATION
                     REQ    EST   PROJECT
  BUDGET     COMPL   COMPL  COMPL ASSESS- MEDIA
(THOUSANDS)  STATUS  DATE   DATE  MENT    TYPE
                                                                      USDA-84
  ADEQUACY OF PROJECT
ENGIN-
EERING    TIME      COST
NM-122307552 PROJECT: 0306070159
CHERRY CREEK CAMPGROUND WATER SYSTEM
ACCT: 25 SWA FUND SDWA
GILA
SILVER CITY                      NM

NM-122307552 PROJECT: 0306020161
STRAIGHT GULCH A.S. WATER SYSTEM
ACCT: 25 SWA FUND SDWA
GILA
SILVER CITY                      NM
        7.0  PSDF   90/12  91/06 MEDIUM  DRINKING  ADEQUATE   ADEQUATE    ADEQUATE
                                          WATER      DESIGN    TIMING     ESTIMATE
        7.0  PSDF   90/12  91/06  LOW    DRINKING  ADEQUATE  ADEQUATE   ADEQUATE
                                          WATER      DESIGN     TIMING    ESTIMATE
NM-122307552 PROJECT: 0306020162
BEAVERHEAD A.S. WATER SYSTEM
ACCT: 25 SWA FUND SDWA
GILA
SILVER CITY                      NM

NM-122307552 PROJECT: 0306020163
KINGSTON ADMIN SITE. WATER SYSTEM
ACCT: 25 SWA FUND SDWA
GILA
SILVER CITY                      NM

NM-122307552 PROJECT: 0306040169
WILLOW CREEK CAMPGROUND WATER SYSTEM
ACCT: 25 SWA FUND SDWA
GILA
SILVER CITY                      NM

NM-122307552 PROJECT: 0306050166
LAKE ROBERTS REC WATER SYSTEM
ACCT: 25 SWA FUND SDWA
GILA
SILVER CITY                      NM
        5.0  PSDF   90/12  91/06 MEDIUM  DRINKING    NOT       NOT        NOT
                                          WATER     AVAIL     AVAIL      AVAIL
       10.0  PSDF   90/12  91/03 MEDIUM   DRINKING  ADEQUATE  ADEQUATE   ADEQUATE
                                         WATER     DESIGN    TIMING    ESTIMATE
        0.0  PSDF   90/12   91/09  MEDIUM  DRINKING  ADEQUATE  ADEQUATE   ADEQUATE
                                         WATER     DESIGN    TIMING    ESTIMATE
       45.0  PSDF   90/12   91/03 MEDIUM  DRINKING  ADEQUATE  ADEQUATE   ADEQUATE
                                         WATER     DESIGN    TIMING    ESTIMATE

-------
                                  FEDERAL AGENCY  POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                          DEPARTMENT OF  AGRICULTURE               FOREST SERVICE
                 PROJECT IDENTIFICATION
                     REQ     EST   PROJECT
  BUDGET     COMPL   COMPL   COMPL ASSESS- MEDIA
(THOUSANDS)   STATUS   DATE    DATE  MENT    TYPE
                                                                                                                      USDA-85
  ADEQUACY OF PROJECT
ENGIN-
EERING    TIME      COST
 NM-122307552 PROJECT:  0306020164
 EMORY PASS SPRING
 ACCT: 25 SWA FUND SDWA
 GILA
 SILVER CITY                     NM

 NM-122307552 PROJECT:  0306070173
 GRANT CO.  AIRPORT FIRE BASE WATER SYSTEM
 ACCT: 25 SWA FUND SDWA
 GILA
 SILVER CITY                     NM

 NM-122307552 PROJECT:  0306080024
 WILDERNESS  CENTER UST
 ACCT:  12 DEPT FUND RCRA
 GILA
 SILVER CITY                     NM

 NM-122307552  PROJECT:  0306060023
 RESERVE ADMIN SITE UST
 ACCT:  12 DEPT FUND RCRA
 GILA
 SILVER  CITY                      NM

 NM-122307552  PROJECT:  0306050025
 MIMBRES ADMIN SITE UST
 ACCT:  12 DEPT FUND RCRA
 GILA
 SILVER CITY                      NM

NM-122307552  PROJECT: 0306020016
KINGSTON ADMIN SITE UST
ACCT:  12 DEPT FUND RCRA
GILA
SILVER CITY                      NM
                                                        5.0  ESRO   91/10  91/03  LOW
       40.0   ESRO    91/10   91/03   LOW
                                        DRINKING  ADEQUATE  ADEQUATE   ADEQUATE
                                         WATER     DESIGN    TIMING    ESTIMATE
                                        DRINKING  ADEQUATE  ADEQUATE   ADEQUATE
                                         WATER     DESIGN    TIMING    ESTIMATE
       27.0   ESDF    91/12  90/09  HIGH    SOLID    ADEQUATE  ADEQUATE   ADEQUATE
                                         WASTE     DESIGN    TIMING    ESTIMATE
       12.0   ESDF    91/12  90/09  HIGH    SOLID    ADEQUATE  ADEQUATE   ADEQUATE
                                         WASTE     DESIGN    TIMING    ESTIMATE
       17.0   ESDF    91/12  90/09  HIGH
       35.0   ESDF   91/12  90/09  HIGH
                                         SOLID    ADEQUATE  ADEQUATE   ADEQUATE
                                         WASTE     DESIGN    TIMING    ESTIMATE
                                         SOLID    ADEQUATE  ADEQUATE   ADEQUATE
                                         WASTE     DESIGN    TIMING    ESTIMATE

-------
                                 FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                         DEPARTMENT OF AGRICULTURE               FOREST SERVICE
                PROJECT IDENTIFICATION
                     REQ    EST   PROJECT
  BUDGET     COMPL   COMPL  COMPL ASSESS- MEDIA
(THOUSANDS)  STATUS  DATE   DATE  MENT    TYPE
                                                                                                                      USDA-86
    ADEQUACY OF PROJECT
  ENGIN-
  EERING    TIME      COST
NM-122307552 PROJECT: 0306020067
WRIGHT CABIN ROADSIDE TOILET
ACCT: 23 SWA FUND CWA-PS
GILA
SILVER CITY                      NM

NM-122307552 PROJECT: 0306020070
COONEY CAMPGROUND TOILET
ACCT: 23 SWA FUND CWA-PS
GILA
SILVER CITY                      NM

NM-122307552 PROJECT: 0306020071
KINGSTON CAMPGROUND TOILET
ACCT: 23 SWA FUND CWA-PS
GILA
SILVER CITY                      NM

NM-122307552 PROJECT: 0306050068
COTTONWOOD CAMPGROUND TOILET
ACCT: 23 SWA FUND CWA-PS
GILA
SILVER CITY                      NM

NM-122307552 PROJECT: 0306060065
APACHE CREEK CAMPGROUND TOILET
ACCT: 23 SWA FUND CWA-PS
GILA
SILVER CITY                      NM

NM-122307552 PROJECT: 0306060066
PUEBLO CREEK CAMPGROUND TOILET
ACCT: 23 SWA FUND CWA-PS
GILA
SILVER CITY                      NM
       24.0  ESDP   77/12  91/03  LOW     WATER    ADEQUATE  ADEQUATE   ADEQUATE
                                                    DESIGN    TIMING    ESTIMATE
        2.0  ESDP   77/12  91/08  LOW      WATER    ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
        2.0  ESDP   77/12  91/06   LOW      WATER    ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
        3.0  ESDP   77/12   91/08  LOW     WATER    ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
       23.0  ESDP   77/12  91/03  LOW     WATER
        3.0  ESDP   77/12   91/06   LOW     WATER
ADEQUATE  ADEQUATE   ADEQUATE
 DESIGN    TIMING    ESTIMATE
                                                  ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE

-------
                                  FEDERAL AGENCY POLLUTION ABATEMENT  PLAN  FOR  FISCAL YEAR  1991

                          DEPARTMENT OF AGRICULTURE               FOREST SERVICE
                 PROJECT IDENTIFICATION
                     REQ     EST    PROJECT
  BUDGET     COMPL   COMPL  COMPL  ASSESS- MEDIA
(THOUSANDS)   STATUS  DATE    DATE   MENT    TYPE
                                                                     USDA-87
  ADEQUACY OF PROJECT
ENGIN-
EERING    TIME      COST
 NM-122307552 PROJECT: 0306040064
 WHITETAIL CAMPGROUND TOILET
 ACCT: 23 SWA FUND CWA-PS
 GILA
 SILVER CITY                      NM

 NM-122307552 PROJECT: 0306040069
 SAN FRANCISCO CAMPGROUND TOILETS
 ACCT: 23 SWA FUND CHA-PS
 GILA
 SILVER CITY                      NM

 NM-122307552 PROJECT:  0306040072
 BURSUM CAMPGROUND TOILET
 ACCT:  23 SWA FUND CWA-PS
 GILA
 SILVER CITY                       NM

 NM-122307552 PROJECT:  0306040073
 WILLOW CREEK CAMPGROUND  TOILETS
 ACCT:  23 SWA FUND CWA-PS
 GILA
 SILVER CITY                       NM

 NM-122307556  PROJECT:  0310030180
 SAN ANTONIO  CAMPGROUND WATER SYSTEM
 ACCT:  25  SWA  FUND  SDWA
 SANTA  FE  NATIONAL  FOREST
 SANTA  FE                          NM

NM-122307556  PROJECT:  0310030188
 PALIZA CAMPGROUND WATER SYSTEM
ACCT: 25  SWA  FUND SDWA
SANTA FE NATIONAL FOREST
SANTA FE                         NM
        2.0   ESDP   77/12   91/08   LOW     WATER
        3.0   ESDP    77/12  91/08 MEDIUM   WATER
                                                  ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
                                                    NOT       NOT
                                                   AVAIL     AVAIL
                     NOT
                    AVAIL
        2.0  ESDP   77/12  91/08  LOW     WATER    ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
      155.0  ESDP   77/12  90/09 MEDIUM   WATER    ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
       2.5  INOV   87/12  91/03  HIGH   DRINKING  ADEQUATE  ADEQUATE   ADEQUATE
                                         WATER     DESIGN    TIMING    ESTIMATE
       0.5  INOV   87/12  91/06  HIGH   DRINKING  ADEQUATE  ADEQUATE   ADEQUATE
                                         WATER     DESIGN    TIMING    ESTIMATE

-------
                                 FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                         DEPARTMENT OF AGRICULTURE               FOREST SERVICE
                PROJECT IDENTIFICATION
                     REQ    EST   PROJECT
  BUDGET     COMPL   COMPL  COMPL ASSESS- MEDIA
(THOUSANDS)  STATUS  DATE   DATE  MENT    TYPE
                                                                     USDA-88
  ADEQUACY OF PROJECT
ENGIN-
EERING    TIME      COST
NM-122307556 PROJECT: 0310030185
SAN ANTONIO CABINS WATER SYSTEM
ACCT: 25 SWA FUND SDWA
SANTA FE NATIONAL FOREST
SANTA FE                         NM

NM-122307556 PROJECT: 0310030186
HORSESHOE SPRINGS CAMPGROUND WATER SYSTEM
ACCT: 25 SWA FUND SDWA
SANTA FE NATIONAL FOREST
SANTA FE                         NM

NM-122307556 PROJECT: 0310030187
HORSESHOE SPRINGS WATER SYSTEM
ACCT: 25 SWA FUND SDWA
SANTA FE NATIONAL FOREST
SANTA FE                         NM

NM-122307556 PROJECT: 0310060181
CANADA ADMIN SITE. WATER SYSTEM
ACCT: 25 SWA FUND SDWA
SANTA FE NATIONAL FOREST
SANTA FE                         NM

NM-122307556 PROJECT: 0310050183
FIELD TRACT CAMPGROUND WATER SYSTEM
ACCT: 25 SWA FUND SDWA
SANTA FE NATIONAL FOREST
SANTA FE                         NM

NM-122307556 PROJECT: 0310050184
JACK'S CREEK WATER SYSTEM
ACCT: 25 SWA FUND SDWA
SANTA FE NATIONAL FOREST
SANTA FE                         NM
        0.1  ESDP   87/12  91/06  HIGH   DRINKING  ADEQUATE   ADEQUATE    ADEQUATE
                                          WATER      DESIGN    TIMING     ESTIMATE
        6.0  ESDP   87/12  90/09  HIGH   DRINKING  ADEQUATE  ADEQUATE   ADEQUATE
                                          WATER      DESIGN    TIMING    ESTIMATE
        1.0  ESDP   90/12  91/06  HIGH    DRINKING   ADEQUATE  ADEQUATE   ADEQUATE
                                          WATER     DESIGN    TIMING    ESTIMATE
        3.5  ESDP   87/12  91/03  HIGH    DRINKING  ADEQUATE  ADEQUATE   ADEQUATE
                                          WATER     DESIGN    TIMING    ESTIMATE
        0.1  ESDP   87/12  91/06  HIGH   DRINKING  ADEQUATE  ADEQUATE   ADEQUATE
                                         WATER     DESIGN    TIMING    ESTIMATE
        0.2  ESDP   88/12   91/06  HIGH   DRINKING  ADEQUATE  ADEQUATE   ADEQUATE
                                         WATER     DESIGN    TIMING    ESTIMATE

-------
                                  FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                          DEPARTMENT OF AGRICULTURE                FOREST SERVICE
                 PROJECT IDENTIFICATION
                                    REQ    EST   PROJECT
                 BUDGET     COMPL   COMPL  COMPL ASSESS- MEDIA
               (THOUSANDS)  STATUS  DATE   DATE  MENT    TYPE
                                                                                                                      USDA-89
  ADEQUACY OF PROJECT
ENGIN-
EERING    TIME      COST
 NM-122307556 PROJECT:  0310060182
 BLACK CANYON CAMPGROUND WATER  SYSTEM
 ACCT: 25 SWA FUND SDWA
 SANTA FE NATIONAL FOREST
 SANTA FE                         NM

 NM-122307556 PROJECT:  0310060096
 SANTA FE RIVER  WATERSHED
 ACCT: 24 SWA FUND CWA-NPS
 SANTA FE NATIONAL FOREST
 SANTA FE                         NM
 NM-122307556  PROJECT:  0310060100
 POJOAQUE WATERSHED
 ACCT:  24 SWA  FUND CWA-NPS
 SANTA  FE NATIONAL FOREST
 SANTA  FE
NM-122307556 PROJECT: 0310060102
RIO GRANDE WATERSHED
ACCT: 24 SWA FUND CWA-NPS
SANTA FE NATIONAL FOREST
SANTA FE

NM-122307556 PROJECT: 0310060103
LOS ALAMOS WATERSHED
ACCT: 24 SWA FUND CWA-NPS
SANTA FE NATIONAL FOREST
SANTA FE
                                 NM
NM
                                 NM
NM-122307556 PROJECT: 0310060108
CAJA DEL RIO WATERSHED
ACCT: 24 SWA FUND CWA-NPS
SANTA FE NATIONAL FOREST
SANTA FE                         NM
                       0.8  ESRO   92/10  91/03  LOW    DRINKING  ADEQUATE   ADEQUATE    ADEQUATE
                                                         WATER     DESIGN    TIMING    ESTIMATE
                     281.6  ESDP   87/12  91/06 MEDIUM   WATER     ADEQUATE   ADEQUATE    ADEQUATE
                                                                   DESIGN    TIMING    ESTIMATE
                       6.3  ESDP   87/12  91/06  LOW     WATER     ADEQUATE   ADEQUATE    ADEQUATE
                                                                   DESIGN    TIMING    ESTIMATE
                       7.5  ESDP   87/12  91/06 MEDIUM   WATER     ADEQUATE   ADEQUATE    ADEQUATE
                                                                   DESIGN    TIMING    ESTIMATE
                       6.5  ESDP   87/12  91/06  LOW     WATER
                      19.3  ESDP   87/12  91/06  LOW     WATER
                                                                  ADEQUATE   ADEQUATE    ADEQUATE
                                                                   DESIGN    TIMING    ESTIMATE
                                                                  ADEQUATE   ADEQUATE    ADEQUATE
                                                                   DESIGN    TIMING    ESTIMATE

-------
                                 FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                         DEPARTMENT OF AGRICULTURE               FOREST SERVICE
                PROJECT IDENTIFICATION
                                    REQ    EST   PROJECT
                 BUDGET     COMPL   COMPL  COMPL ASSESS- MEDIA
               (THOUSANDS)  STATUS  DATE   DATE  MENT    TYPE
                                                                                                                      USDA-90
    ADEQUACY OF PROJECT
  ENGIN-
  EERING    TIME      COST
NM-122307556 PROJECT: 03100*0095
GALLINAS-TECOLOTE WATERSHED
ACCT: 24 SWA FUND CWA-NPS
SANTA FE NATIONAL FOREST
SANTA FE                         NM
                     748.0  ESDP   67/12  91/06 MEDIUM   WATER
ADEQUATE  ADEQUATE   ADEQUATE
 DESIGN    TIMING    ESTIMATE
NM-122307556 PROJECT: 0310040105
MORA RIVER WATERSHED
ACCT: 24 SWA FUND CWA-NPS
SANTA FE NATIONAL FOREST
SANTA FE                         NM

NM-122307556 PROJECT: 0310040106
COW CREEK WATERSHED
ACCT: 24 SWA FUND CWA-NPS
SANTA FE NATIONAL FOREST
SANTA FE                         NM

NM-122307556 PROJECT: 0310050099
UPPER PECOS WATERSHED
ACCT: 24 SWA FUND CWA-NPS
SANTA FE NATIONAL FOREST
SANTA FE                         NM
NM-122307556 PROJECT: 0310050109
GALISTEO WATERSHED
ACCT: 24 SWA FUND CWA-NPS
SANTA FE NATIONAL FOREST
SANTA FE
NM-122307556 PROJECT: 0310050110
LOW PECOS WATERSHED
ACCT: 24 SWA FUND CWA-NPS
SANTA FE NATIONAL FOREST
SANTA FE
NM
NM
                       5.3  ESDP   87/12  91/06  LOW     WATER
                      38.5  ESDP   87/12  91/06  LOW     WATER
                      54.5  ESDP   87/12  91/06 MEDIUM   WATER
                                                       41.3  ESDP   87/12  91/06 MEDIUM   WATER
                                                       44.9  ESDP   87/12  91/06 MEDIUM   WATER
                                                                  ADEQUATE   ADEQUATE
                                                                   DESIGN    TIMING
                                                                  ADEQUATE   ADEQUATE
                                                                   DESIGN     TIMING
                                                                  ADEQUATE  ADEQUATE
                                                                   DESIGN    TIMING
                                                                 ADEQUATE  ADEQUATE
                                                                  DESIGN    TIMING
                                                                 ADEQUATE  ADEQUATE
                                                                  DESIGN    TIMING
                     ADEQUATE
                     ESTIMATE
                     ADEQUATE
                     ESTIMATE
                     ADEQUATE
                     ESTIMATE
                     ADEQUATE
                     ESTIMATE
                     ADEQUATE
                     ESTIMATE

-------
                                  FEDERAL AGENCY POLLUTION ABATEMENT  PLAN  FOR  FISCAL YEAR  1991

                          DEPARTMENT OF AGRICULTURE               FOREST SERVICE
                 PROJECT IDENTIFICATION
                     REQ    EST    PROJECT
  BUDGET     COMPL    COMPL   COMPL  ASSESS- MEDIA
(THOUSANDS)   STATUS   DATE    DATE   MENT    TYPE
                                                                     USDA-91
  ADEQUACY OF PROJECT
ENGIN-
EERING    TIME      COST
 NM-122307556 PROJECT: 0310010017
 UPPER CHAMA WATERSHED
 ACCT: 24 SWA FUND CWA-NPS
 SANTA FE NATIONAL FOREST
 SANTA FE                         NM

 NM-122307556 PROJECT: 0310010101
 CHAMA RIO PUERCO WATERSHED
 ACCT: 24 SWA FUND CWA-NPS
 SANTA FE NATIONAL FOREST
 SANTA FE                         NM

 NM-122307556 PROJECT: 0310010107
 LOWER CHAMA  WATERSHED
 ACCT:  24 SWA FUND CWA-NPS
 SANTA FE NATIONAL FOREST
 SANTA FE                         NM

 NM-122307556  PROJECT:  0310010132
 RIO GALLINA  WATERSHED
 ACCT:  24 SWA  FUND  CWA-NPS
 SANTA  FE  NATIONAL FOREST
 SANTA  FE                          NM

 NM-122307556  PROJECT:  0310020098
 RIO GUADALUPE WATERSHED
 ACCT:  24  SWA  FUND  CWA-NPS
 SANTA  FE  NATIONAL  FOREST
 SANTA  FE                          NM

NM-122307556  PROJECT:  0310020104
UPPER RIO PUERCO WATERSHED
ACCT: 24  SWA FUND CWA-NPS
SANTA FE NATIONAL FOREST
SANTA FE                          NM
       26.0   ESDP    67/12   91/06  HIGH    WATER
       12.7   ESDP   87/12  91/06   LOW     WATER
       24.8   ESDP   87/12  91/06  LOW     WATER
     521.2  ESDP   87/12  90/09  LOW     WATER
      77.7  ESDP   87/12  91/06 MEDIUM   WATER
      12.5  ESDP   87/12  91/06  LOW     WATER
                                                    NOT
                                                   AVAIL
          NOT
         AVAIL
 NOT
AVAIL
                                                  ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
                                                  ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
                                                  ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
                                                  ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
                                                  ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE

-------
                                 FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                         DEPARTMENT OF AGRICULTURE               FOREST SERVICE
                PROJECT IDENTIFICATION
                     REQ    EST   PROJECT
  BUDGET     COMPL   COMPL  COMPL ASSESS- MEDIA
(THOUSANDS)  STATUS  DATE   DATE  MENT    TYPE
                                                                     USDA-92
  ADEQUACY OF PROJECT
ENGIN-
EERING    TIME      COST
NM-122307556 PROJECT: 0310020111
CANON LARGO WATERSHED
ACCT: 24 SWA FUND CWA-NPS
SANTA FE NATIONAL FOREST
SANTA FE                         NM

NM-122307556 PROJECT: 0310030097
JEMEZ RIVER WATERSHED
ACCT: 24 SWA FUND CWA-NPS
SANTA FE NATIONAL FOREST
SANTA FE                         NM

NM-122307559 PROJECT: 0308000203
LINCOLN PESTICIDE DISPOSAL
ACCT: 12 DEPT FUND RCRA
LINCOLN NF
ALAMOGORDO                       NM

NM-122307559 PROJECT: 0308040076
MAYHILL ADMIN SITE MANHOLES
ACCT: 23 SWA FUND CWA-PS
LINCOLN NF
ALAMOGORDO                       NM

NV-122307588 PROJECT: 0409045001
TIMBER CREEK CAMPGROUND WATER SYS. RECONSTRUCTI
ACCT: 25 SWA FUND SDWA
HUMBOLDT NATL FOREST
ELKO                             NV

NV-122307588 PROJECT: 0409045006
BIRD CREEK CAMPGROUND
ACCT: 25 SWA FUND SDWA
HUMBOLDT NATL FOREST
E LKO                             NV
      334.4  ESDP   87/12  91/06  LOW     WATER     ADEQUATE   ADEQUATE    ADEQUATE
                                                    DESIGN     TIMING     ESTIMATE
       19.1   ESDP   87/12  91/06  MEDIUM   WATER     ADEQUATE  ADEQUATE   ADEQUATE
                                                    DESIGN    TIMING    ESTIMATE
        3.0  ESDP   88/12   90/11   HIGH   PESTICIDES ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
        9.0   OTHR    91/10   91/03  MEDIUM   WATER    ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
       32.0   ESDP   80/12   91/02  HIGH   DRINKING  ADEQUATE  ADEQUATE   ADEQUATE
                                         WATER     DESIGN    TIMING    ESTIMATE
       32.0   ESDP    80/12   91/01  HIGH   DRINKING  ADEQUATE  ADEQUATE   ADEQUATE
                                         WATER     DESIGN    TIMING    ESTIMATE

-------
                                  FEDERAL  AGENCY  POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                          DEPARTMENT  OF  AGRICULTURE               FOREST SERVICE
                 PROJECT IDENTIFICATION
                     REQ     EST   PROJECT
  BUDGET     COMPL    COMPL   COMPL ASSESS- MEDIA
(THOUSANDS)   STATUS   DATE    DATE  MENT    TYPE
                                                                                                                     USDA-93
  ADEQUACY OF PROJECT
ENGIN-
EERING    TIME      COST
 NV-122307588 PROJECT:  0409055012
 LACCA CABIN ADMINISTRATION  SITE
 ACCT: 25 SWA FUND  SDWA
 HUMBOLDT NATL FOREST
 ELKO                            NV

 NV-122307588 PROJECT:  0409055013
 PARIDISE GUARD  STATION
 ACCT:  25 SWA FUND  SDWA
 HUMBOLDT NATL FOREST
 ELKO                            NV

 NV-122307588 PROJECT:  0409031004
 BOGDANISH MILL  SITE
 ACCT:  11  DEPT FUND CERCLA
 HUMBOLDT  NATL FOREST
 ELKO                            NV

 NV-1223075S8 PROJECT:  0409031001
 BUCKSKIN  MINE
 ACCT:  11  DEPT FUND CERCLA
 HUMBOLDT NATL FOREST
 ELKO                             NV

 NV-122307588  PROJECT:  0409031003
 RIO  TINTO MINE
 ACCT:  11 DEPT FUND CERCLA
HUMBOLDT NATL FOREST
 ELKO                             NV

NV-122307588 PROJECT:  0409023001
ANGEL CREK CAMPGROUND
ACCT: 23 SWA FUND CKA-PS
HUMBOLDT NATL FOREST
 ELKO                             NV
       15.0   ESDP   80/12   90/12  HIGH   DRINKING  ADEQUATE  ADEQUATE   ADEQUATE
                                         WATER     DESIGN    TIMING    ESTIMATE
       15.0   ESDP   80/12  91/02  HIGH   DRINKING  ADEQUATE  ADEQUATE   ADEQUATE
                                         WATER     DESIGN    TIMING    ESTIMATE
        5.0   ESDP   66/10  91/07 MEDIUM   CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
      500.0   ESDP   86/10  90/09  HIGH    CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
    1)000.0  ESDP   66/10  90/09  HIGH    CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
       25.0  ESDF   82/07  91/03 MEDIUM   WATER    ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE

-------
                                 FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                         DEPARTMENT OF AGRICULTURE               FOREST SERVICE
                PROJECT IDENTIFICATION
                     REQ    EST   PROJECT
  BUDGET     COMPL   COMPL  COMPL ASSESS- MEDIA
(THOUSANDS)   STATUS  DATE   DATE  MENT     TYPE
                                                                                                                      USDA-94
    ADEQUACY OF PROJECT
  ENGIN-
  EERING    TIME      COST
OH-122307769 PROJECT: 0911010403
ESSEX MINE - ACID RUNOFF
ACCT: 24 SWA FUND CWA-NPS
WAYNE-HOOSIER N.F.
BEDFORD                          OH

OH-122307769 PROJECT: 0911030404
IRONTON MINES
ACCT: 24 SWA FUND CWA-NPS
WAYNE-HOOSIER N.F.
BEDFORD                          OH

OH-122307769 PROJECT: 0911010405
ATHENS MINES - RUNOFF
ACCT: 24 SWA FUND CWA-NPS
WAYNE-HOOSIER N.F.
BEDFORD                          OH

OH-122307769 PROJECT: 0911010406
COAL MINE - SEAL SHAFT
ACCT: 24 SWA FUND CWA-NPS
WAYNE-HOOSIER N.F.
BEDFORD                          OH

OH-122307777 PROJECT: 0911030101
WEBB SITE
ACCT: 11 DEPT FUND CERCLA
WAYNE-HOOSIER N.F.
BEDFORD                          OH

OH-122307777 PROJECT: 0911010207
ATHENS CO. LANDFILL
ACCT: 12 DEPT FUND RCRA
WAYNE-HOOSIER N.F.
BEDFORD                          OH
        2.0  ESDP   87/10  91/09  HIGH     WATER
        6.0  ESDP   87/10  91/09  HIGH     WATER
       10.0  ESDP   87/12  90/09  HIGH    WATER
ADEQUATE  ADEQUATE   ADEQUATE
 DESIGN    TIMING    ESTIMATE
  NOT       NOT
 AVAIL     AVAIL
                                                    NOT
                                                   AVAIL
            NOT
           AVAIL
 NOT
AVAIL
 NOT
AVAIL
        1.2  ESDP   87/12  90/09  MEDIUM   WATER    ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
       10.0  INOV   86/10  90/09  HIGH    CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
       25.0  ESDP   86/10   91/05  HIGH    SOLID    ADEQUATE  ADEQUATE   ADEQUATE
                                         WASTE     DESIGN    TIMING    ESTIMATE

-------
                                  FEDERAL AGENCY POLLUTION ABATEMENT  PLAN  FOR FISCAL YEAR 1991

                          DEPARTMENT OF AGRICULTURE                FOREST SERVICE
                 PROJECT IDENTIFICATION
                     REQ    EST    PROJECT
  BUDGET     COMPL   COMPL   COMPL  ASSESS- MEDIA
(THOUSANDS)   STATUS  DATE    DATE   MENT    TYPE
                                                                     USDA-95
  ADEQUACY OF PROJECT
ENGIN-
EERING    TIME      COST
 OH-122314802 PROJECT:  2405000003
 FOREST SCIENCE LAB,  PCB REMOVAL
 ACCT: 27 SWA FUND TSCA
 FOR SCIENCES LAB
 DELAWARE                         OH

 CR-12230180'+ PROJECT:  0615010002
 DORENA TREE INPROVEMENT CENTER  3 UST
 ACCT: 12 DEPT FUND RCRA
 UMPQUA NATIONAL  FOREST
 ROSEBURG                         OR

 OR-122301804 PROJECT:  0615030002
 TOKETEE  RS-5 UST  TO NEW STANDARDS
 ACCT:  12  DEPT FUND RCRA
 UMPQUA NATIONAL FOREST
 ROSEBURG                          OR

 OR-122301822  PROJECT:  0615070002
 WOLF  CR JCCC  WATER SYSTEM IMPROVEMENTS
 ACCT: 25  SWA  FUND SDWA
 UMPQUA NATIONAL FOREST
 ROSEBURG                          OR

 OR-122301825  PROJECT:  0615020002
 TILLER RS, WATER SYSTEM
 ACCT: 25  SWA  FUND SDWA
 UMPQUA NATIONAL FOREST
 ROSBURG                           OR

OR-122302721  PROJECT:  0607020002
RAGER RS UST REPLACEMENT
ACCT: 12 DEPT FUND RCRA
OCHOCO NF
PRINEVILLE                        OR
       80.0   ESDP    90/03   90/10 MEDIUM   TOXIC    ADEQUATE  ADEQUATE   ADEQUATE
                                       SUBSTANCE   DESIGN    TIMING    ESTIMATE
       40.0   ESDF    93/12   90/10 MEDIUM   SOLID    ADEQUATE  ADEQUATE   ADEQUATE
                                         WASTE     DESIGN    TIMING    ESTIMATE
      100.0   ESDF    93/12   90/10 MEDIUM   SOLID    ADEQUATE  ADEQUATE   ADEQUATE
                                         WASTE     DESIGN    TIMING    ESTIMATE
       5.0   PSDF   90/12  90/12   LOW    DRINKING  ADEQUATE  ADEQUATE   ADEQUATE
                                         WATER     DESIGN    TIMING    ESTIMATE
       5.0  PSDF   90/12  90/12  LOW
            ESDF   93/12  90/12  LOW
                                        DRINKING  ADEQUATE  ADEQUATE   ADEQUATE
                                         WATER     DESIGN    TIMING    ESTIMATE
                                         SOLID    ADEQUATE  ADEQUATE   ADEQUATE
                                         WASTE     DESIGN    TIMING    ESTIMATE

-------
                                 FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                         DEPARTMENT OF AGRICULTURE               FOREST SERVICE
                PROJECT IDENTIFICATION
                     REQ    EST   PROJECT
  BUDGET     COMPL   COMPL  COMPL ASSESS- MEDIA
(THOUSANDS)  STATUS  DATE   DATE  MENT    TYPE
                                                                      USDA-96
  ADEQUACY OF PROJECT
ENGIN-
EERING    TIME      COST
OR-122302762 PROJECT: 0607040001
ALLISON GS UST REPLACEMENT
ACCT: 12 DEPT FUND RCRA
OCHOCO NF
PRIMEVILLE                       OR

OR-122307654 PROJECT: 0618070001
ICE CAP CG WATER SUPPLY
ACCT: 25 SWA FUND SDWA
MT HOOD NF
GRESHAM                          OR
       25.0  ESDF   93/12  90/12  LOW     SOLID    ADEQUATE   ADEQUATE    ADEQUATE
                                          WASTE     DESIGN    TIMING     ESTIMATE
       40.0  ESDP   86/12  90/12  HIGH   DRINKING  ADEQUATE   ADEQUATE   ADEQUATE
                                          WATER      DESIGN   TIMING    ESTIMATE
OR-122307654 PROJECT: 0618070002
BIG LAKE CG-WATER SYSTEM
ACCT: 25 SWA FUND SDWA
MT HOOD NF
GRESHAM                          OR

OR-122307654 PROJECT: 0606040005
LARCH MTN WATER SYSTEM
ACCT: 25 SWA FUND SDWA
MT HOOD NF
GRESHAM                          OR

OR-122307654 PROJECT: 0606030005
RIPPLEBROOK RAINBOW CG DISTRIBUTION LINES
ACCT: 25 SWA FUND SDWA
MT HOOD NF
GRESHAM                          OR

OR-122307654 PROJECT: 0606030007
SILVERTIP ADM SITE-WATER SYSTEM SOURCE IMP
ACCT: 25 SWA FUND SDWA
MT HOOD NF
GRESHAM                          OR
       40.0  ESDP   86/12  90/09  HIGH   DRINKING   ADEQUATE  ADEQUATE   ADEQUATE
                                          WATER     DESIGN    TIMING    ESTIMATE
       85.0  ESDF   00/01  90/09  LOW    DRINKING  ADEQUATE  ADEQUATE   ADEQUATE
                                          WATER     DESIGN    TIMING    ESTIMATE
       30.0  ESDF   91/09  90/09  MEDIUM  DRINKING  ADEQUATE  ADEQUATE   ADEQUATE
                                         WATER     DESIGN    TIMING    ESTIMATE
       20.0  PSDF   90/12   90/12  MEDIUM  DRINKING  ADEQUATE  ADEQUATE   ADEQUATE
                                         WATER     DESIGN    TIMING    ESTIMATE

-------
                                  FEDERAL AGENCY POLLUTION  ABATEMENT PLAN FOR FISCAL YEAR 1991

                          DEPARTMENT OF AGRICULTURE               FOREST SERVICE
                 PROJECT IDENTIFICATION
                     REq    EST    PROJECT
  BUDGET     COMPL   COMPL   COMPL  ASSESS- MEDIA
(THOUSANDS)   STATUS  DATE    DATE   MENT    TYPE
                                                                                                                      USDA-97
  ADEQUACY OF PROJECT
ENGIN-
EERING    TIME      COST
 OR-122307654 PROJECT:  0606090005
 TIMBERLINE LODGE - CAP & DEVELOP SPRING
 ACCT: 25 SWA FUND SDWA
 MT HOOD NF
 GRESHAM                          OR

 OR-122307654 PROJECT:  0606090004
 GREEN CANYON CG FILTER & RECONDITION  STOR
 ACCT: 25 SWA FUND SDWA
 MT HOOD NF
 GRESHAM                          OR

 OR-122307654 PROJECT:  0606040006
 WYETHHOUSE WATER  SYSTEM
 ACCT:  25 SWA FUND  SDWA
 MT  HOOD  NF
 GRESHAM                           OR
       67.5  PSDF    90/12   90/12  MEDIUM  DRINKING  ADEQUATE  ADEQUATE   ADEQUATE
                                         WATER     DESIGN    TIMING    ESTIMATE
       35.0   PSDF    90/12   90/12 MEDIUM  DRINKING  ADEQUATE  ADEQUATE   ADEQUATE
                                         WATER     DESIGN    TIMING    ESTIMATE
       25.0   PSDF    90/12   90/09   LOW    DRINKING  ADEQUATE  ADEQUATE   ADEQUATE
                                         WATER     DESIGN    TIMING    ESTIMATE
OR-122307654 PROJECT: 0618040003
RIVERSIDE CG-WATER SYSTEM,ADD FILTRATION
ACCT: 25 SWA FUND SDWA
MT HOOD NF
GRESHAM                          OR
       35.0   PSDF    90/12  90/12 MEDIUM  DRINKING  ADEQUATE  ADEQUATE   ADEQUATE
                                         WATER     DESIGN    TIMING    ESTIMATE
OR-122307654 PROJECT: 0618040009
DETROIT RS-WATER SUPPLY
ACCT: 25 SWA FUND SDWA
MT HOOD NF
GRESHAM                          OR

OR-122307654 PROJECT: 0618060002
LOWELL RS -UST
ACCT: 12 DEPT FUND RCRA
MT HOOD NF
GRESHAM                          OR
      60.0   PSDF    90/12  90/12 MEDIUM  DRINKING  ADEQUATE  ADEQUATE   ADEQUATE
                                         WATER     DESIGN    TIMING    ESTIMATE
      100.0  ESDF   92/12  91/01  LOW     SOLID    ADEQUATE  ADEQUATE   ADEQUATE
                                         WASTE     DESIGN    TIMING    ESTIMATE

-------
                                 FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                         DEPARTMENT OF AGRICULTURE               FOREST SERVICE
                PROJECT IDENTIFICATION
                     REQ    EST   PROJECT
  BUDGET     COMPL   COMPL  COMPL ASSESS- MEDIA
(THOUSANDS)  STATUS  DATE   DATE   MENT   TYPE
                                                                                                                      USDA-98
  ADEQUACY OF PROJECT
ENGIN-
EERING    TIME      COST
OR-122307654 PROJECT: 0618010004
BLUE RIVER UST
ACCT: 12 DEPT FUND RCRA
MT HOOD NF
GRESHAM
                                 OR
OR-122307654 PROJECT: 0618030001
SWEET HOME REPLACE PCB BALLAST
ACCT: 27 SWA FUND TSCA
MT HOOD NF
GRESHAM                          OR

OR-122307654 PROJECT: 06180*0002
DETROIT RS-REPLACE PCB BALLASTS
ACCT: 27 SWA FUND TSCA
MT HOOD NF
GRESHAM                          OR

OR-122307654 PROJECT: 0606030001
RIPPLEBROOK ADM SITE SEWER CONNECTION
ACCT: 23 SWA FUND CWA-PS
MT HOOD NF
GRESHAM                          OR

OR-122307657 PROJECT: 0601050009
SISTERS REPLACE FUEL TANKS
ACCT: 12 DEPT FUND RCRA
DESCHUTES NATIONAL FOREST
BEND                             OR

OR-122307658 PROJECT: 0602040002
PUDDLE SPRINGS WS,RECONSTRUCT WATER SYSTEM
ACCT: 25 SWA FUND SDWA
FREMONT NF
LAKEVIEW                         OR
      100.0  ESDF   93/12  90/12  MEDIUM   SOLID    ADEQUATE  ADEQUATE   ADEQUATE
                                          WASTE     DESIGN    TIMING    ESTIMATE
        3.0  ESDP   88/12   90/09   HIGH    TOXIC    ADEQUATE  ADEQUATE   ADEQUATE
                                        SUBSTANCE   DESIGN    TIMING    ESTIMATE
       11.0  ESDP   88/12   90/09   HIGH    TOXIC    ADEQUATE  ADEQUATE   ADEQUATE
                                       SUBSTANCE   DESIGN    TIMING    ESTIMATE
       20.0  ESRO   91/01   90/09  MEDIUM   WATER    ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
       65.0  ESDF   93/12   90/12 MEDIUM   SOLID    ADEQUATE  ADEQUATE   ADEQUATE
                                         WASTE     DESIGN    TIMING    ESTIMATE
       15.0  INOV   86/12   90/12  HIGH   DRINKING  ADEQUATE  ADEQUATE   ADEQUATE
                                         WATER     DESIGN    TIMING    ESTIMATE

-------
                                  FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR  FISCAL YEAR  1991

                          DEPARTMENT OF AGRICULTURE               FOREST SERVICE
                 PROJECT IDENTIFICATION
                     REQ    EST    PROJECT
  BUDGET     COMPL   COMPL  COMPL  ASSESS- MEDIA
(THOUSANDS)   STATUS  DATE    DATE   MENT    TYPE
                                                                     USDA-99
  ADEQUACY OF PROJECT
ENGIN-
EERING    TIME      COST
 OR-122307658 PROJECT: 0602020100
 WHITE KINS-LUCKY LASS MINES
 ACCT: 11 DEPT FUND CERCLA
 FREMONT NF
 LAKEVIEW                         OR

 OR-122307658 PROJECT: 0602030001
 PAISLEY RD,REMOVAL/REPLACE  UST
 ACCT: 12 DEPT FUND RCRA
 FREMONT NF
 LAKEVIEW                         OR

 OR-12230765S PROJECT:  0602020002
 LAKEVIEW ROAD, REMOVE/REPLACE UST
 ACCT:  12 DEPT FUND  RCRA
 FREMONT  NF
 LAKEVIEW                         OR

 OR-122307660  PROJECT:  0604040001
 CRANE  PRAIRIE WORK  CENTER
 ACCT:  25 SWA  FUND SDWA
 MALHEUR  NF
 JOHN DAY                         OR

 OR-122307660  PROJECT: 0604020002
 YELLOWJACKET  CG WATER SYSTEM
 ACCT:  25  SWA  FUND SDWA
 MALHEUR  NF
 JOHN DAY                          OR

 OR-122307660  PROJECT: 0604000001
UNDERGROUND STORAGE TANKS
ACCT:  12 DEPT FUND RCRA
MALHEUR NF
JOHN DAY                          OR
    5,780.0   ESDP   86/10   90/09   HIGH    CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
       28.0   ESDF    93/12   91/12  HIGH    SOLID    ADEQUATE  ADEQUATE   ADEQUATE
                                         WASTE     DESIGN    TIMING    ESTIMATE
      100.0   ESDF    93/12   90/12 MEDIUM   SOLID    ADEQUATE  ADEQUATE   ADEQUATE
                                         WASTE     DESIGN    TIMING    ESTIMATE
      87.0   ESDP   66/12  90/09  HIGH   DRINKING  ADEQUATE  ADEQUATE   ADEQUATE
                                         WATER     DESIGN    TIMING    ESTIMATE
      50.0  ESRO   91/06  90/09 MEDIUM  DRINKING  ADEQUATE  ADEQUATE   ADEQUATE
                                         WATER     DESIGN    TIMING    ESTIMATE
      75.0  ESDF   93/12  90/09 MEDIUM   SOLID    ADEQUATE  ADEQUATE   ADEQUATE
                                         WASTE     DESIGN    TIMING    ESTIMATE

-------
                                 FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                         DEPARTMENT OF AGRICULTURE               FOREST SERVICE
                PROJECT IDENTIFICATION
                     REQ    EST   PROJECT
  BUDGET     COMPL   COMPL  COMPL ASSESS- MEDIA
(THOUSANDS)  STATUS  DATE   DATE  MENT    TYPE
                                                                                                                      USDA-100
  ADEQUACY OF PROJECT
ENGIN-
EERING    TIME      COST
OR-122307660 PROJECT: 0604000002
ASBESTOS ABATEMENT BLDG 2100
ACCT: 27 SWA FUND TSCA
MALHEUR NF
JOHN DAY                         OR

OR-122307663 PROJECT: 0611040001
ILLINOIS VALLEY RS,MUNICIPAL CONNECTION
ACCT: 23 SWA FUND CWA-PS
SISKIYOU NF
GRANTS PASS                      OR

OR-122307666 PROJECT: 0610194201
J.HERBERT STONE NURSERY, REPLACE UST
ACCT: 12 DEPT FUND RCRA
ROGUE RIVER NF
MEDFORD                          OR

OR-122307666 PROJECT: 0610061201
PROSPECT ROAD BUILDING 81055
ACCT: 27 SWA FUND TSCA
ROGUE RIVER NF
MEDFORD                          OR

OR-122307666 PROJECT: 0610061101
PROSPECT ROAD BUILDING S1058
ACCT: 27 SWA FUND TSCA
ROGUE RIVER NF
MEDFORD                          OR

OR-122307666 PROJECT: 0610061102
PROSPECT ROAD BUILDING S2205
ACCT: 27 SWA FUND TSCA
ROGUE RIVER NF
MEDFORD                          OR
        8.0  ESDF   89/11  90/09 MEDIUM   TOXIC    ADEQUATE   ADEQUATE   ADEQUATE
                                        SUBSTANCE    DESIGN     TIMING    ESTIMATE
      226.0  ESDF   87/12  90/10 MEDIUM   WATER     ADEQUATE   ADEQUATE   ADEQUATE
                                                    DESIGN    TIMING    ESTIMATE
      140.0  ESDF   92/09  91/09 MEDIUM   SOLID    ADEQUATE  ADEQUATE   ADEQUATE
                                          WASTE     DESIGN    TIMING    ESTIMATE
        2.0  ESDF   92/09  91/09 MEDIUM   TOXIC    ADEQUATE  ADEQUATE   ADEQUATE
                                        SUBSTANCE   DESIGN    TIMING    ESTIMATE
        1.0  ESDF   92/09  91/09  MEDIUM   TOXIC    ADEQUATE  ADEQUATE   ADEQUATE
                                       SUBSTANCE   DESIGN    TIMING    ESTIMATE
        8.0  ESDF    92/09   91/09 MEDIUM   TOXIC    ADEQUATE  ADEQUATE   ADEQUATE
                                       SUBSTANCE   DESIGN    TIMING    ESTIMATE

-------
                                  FEDERAL AGENCY POLLUTION  ABATEMENT PLAN FOR FISCAL YEAR 1991

                          DEPARTMENT OF AGRICULTURE                FOREST SERVICE
                 PROJECT IDENTIFICATION
                     REQ     EST    PROJECT
  BUDGET     COMPL   COMPL   COMPL  ASSESS- MEDIA
(THOUSANDS)   STATUS   DATE    DATE   MENT    TYPE
                                                                                                                      USDA-101
  ADEQUACY OF PROJECT
ENGIN-
EERING    TIME      COST
 OR-122307666 PROJECT:  0610011101
 APPLEGATE RANGER DISTRICT BUILDING S1041
 ACCT: 27 SWA FUND TSCA
 ROGUE RIVER NF
 MEDFORD                          OR

 OR-122307666 PROJECT:  0610031201
 BUTTE FALLS RANGER  DISTRICT  BUILDING  81003
 ACCT: 27 SWA FUND TSCA
 ROGUE RIVER NF
 MEDFORD                           OR

 OR-122307666  PROJECT:  0610031202
 BUTTE FALLS RAN3ER  DISTRICT  BUILDING  81014
 ACCT:  27 SWA  FUND TSCA
 ROGUE RIVER NF
 MEDFORD                           OR

 OR-122307666  PROJECT:  0610031203
 BUTTE  FALLS RANGER  DISTRICT  BUILDING  82002
 ACCT:  27 SWA  FUND TSCA
 ROGUE  RIVER NF
 MEDFORD                           OR

 OR-122307666  PROJECT:  0610031204
 BUTTE  FALLS RD BUILDING S2200
 ACCT:  27  SWA  FUND TSCA
 ROGUE RIVER NF
 MEDFORD                           OR

 OR-122307673  PROJECT:  0616040407
BLACKHORSE CG-WELL  CONSTRUCTION
ACCT: 25 SWA  FUND SDWA
WALLOWA-WHITMAN NATIONAL FOREST
BAKER                             OR
        1.0   ESDF    91/12   90/12 MEDIUM   TOXIC    ADEQUATE  ADEQUATE   ADEQUATE
                                       SUBSTANCE   DESIGN    TIMING    ESTIMATE
        1.0   ESDF    91/12   90/12 MEDIUM   TOXIC    ADEQUATE  ADEQUATE   ADEQUATE
                                       SUBSTANCE   DESIGN    TIMING    ESTIMATE
        3.0   ESDF   91/12  90/12 MEDIUM   TOXIC    ADEQUATE  ADEQUATE   ADEQUATE
                                       SUBSTANCE   DESIGN    TIMING    ESTIMATE
        1.0   ESDF   92/12  91/12 MEDIUM   TOXIC    ADEQUATE  ADEQUATE   ADEQUATE
                                       SUBSTANCE   DESIGN    TIMING    ESTIMATE
        1.0  OTHR   92/09  91/09 MEDIUM   TOXIC    ADEQUATE  ADEQUATE   ADEQUATE
                                       SUBSTANCE   DESIGN    TIMING    ESTIMATE
       5.0  ESDP   86/12  91/03  HIGH   DRINKING  ADEQUATE  ADEQUATE   ADEQUATE
                                         WATER     DESIGN    TIMING    ESTIMATE

-------
                                 FEDERAL A6ENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                         DEPARTMENT OF AGRICULTURE               FOREST SERVICE
                PROJECT IDENTIFICATION
                     REQ    EST   PROJECT
  BUDGET     COMPL   COMPL  COMPL ASSESS- MEDIA
(THOUSANDS)  STATUS  DATE   DATE  MENT    TYPE
                                                                                                                      USDA-102
  ADEQUACY OF PROJECT
ENGIN-
EERING    TIME      COST
OR-122307673 PROJECT: 0616060601
TWO COLOR CG SPRING BOX REPLACEMENT
ACCT: 25 SWA FUND SDWA
WALLOWA-WHITMAN NATIONAL FOREST
BAKER                            OR

OR-122307673 PROJECT: 0616040401
NORTH PINE REST STOP SPRINGBOX RECONSTRUCTION
ACCT: 25 SWA FUND SDWA
WALLOWA-WHITMAN NATIONAL FOREST
BAKER                            OR
         .0  ESDP   86/12  91/04  HIGH   DRINKING  ADEQUATE   ADEQUATE    ADEQUATE
                                          WATER      DESIGN    TIMING    ESTIMATE
        1.0  ESDP   86/12  91/02  HIGH   DRINKING  ADEQUATE  ADEQUATE   ADEQUATE
                                          WATER      DESIGN    TIMING    ESTIMATE
OR-122307673 PROJECT: 0616090902
WETMORE CG SPRINGBOX RECONSTRUCTION
ACCT: 25 SWA FUND SDWA
WALLOWA-WHITMAN NATIONAL FOREST
BAKER                            OR

OR-122307673 PROJECT: 0616040403
KIRKWOOD RANCH SLOW SAND FILTER
ACCT: 25 SWA FUND SDWA
WALLOWA-WHITMAN NATIONAL FOREST
BAKER                            OR

OR-122307673 PROJECT: 0616010102
CORNUCOPIA SLUM DAM
ACCT: 11 DEPT FUND CERCLA
WALLOWA-WHITMAN NATIONAL FOREST
BAKER                            OR

OR-122307673 PROJECT: 0616020201
BILLY MEADOWS GS UST REPLACEMENT
ACCT: 12 DEPT FUND RCRA
WALLOWA-WHITMAN NATIONAL FOREST
BAKER                            OR
        4.0  ESDP   86/12   91/04  HIGH    DRINKING  ADEQUATE  ADEQUATE   ADEQUATE
                                         WATER     DESIGN    TIMING    ESTIMATE
       50.0  PSDF   90/12   91/02  MEDIUM  DRINKING  ADEQUATE  ADEQUATE   ADEQUATE
                                         WATER     DESIGN    TIMING    ESTIMATE
       10.0  ESDP   86/10   90/09  HIGH    CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
       15.0   ESDF    93/12   91/03 MEDIUM   SOLID    ADEQUATE  ADEQUATE   ADEQUATE
                                         WASTE     DESIGN    TIMING    ESTIMATE

-------
                                  FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR  FISCAL YEAR  1991

                          DEPARTMENT OF AGRICULTURE               FOREST  SERVICE
                 PROJECT IDENTIFICATION
                     REQ    EST    PROJECT
  BUDGET     COMPL   COMPL   COMPL  ASSESS- MEDIA
(THOUSANDS)   STATUS  DATE    DATE   MENT    TYPE
                                                                     USDA-103
  ADEQUACY OF PROJECT
ENGIN-
EERING    TIME      COST
 OR-122307673 PROJECT: 0616040404
 LICK CREEK GS UST REPLACEMENT
 ACCT: 12 DEPT FUND RCRA
 K'ALLOWA-WHITnAN NATIONAL FOREST
 BAKER                            OR

 OR-122307673 PROJECT: 0616040001
 ASBESTOS ABATEMENT & RADON TESTING,  FOREST  WIDE
 ACCT: 27 SWA FUND TSCA
 WALLOWA-WHITMAN NATIONAL FOREST
 BAKER                            OR

 OR-122307763 PROJECT:  0614020001
 BULL  PRAIRIE CG.ADD  TREATMENT
 ACCT:  25  SWA FUND  SDWA
 SIUSLAW NF
 CORVALLIS                         OR

 OR-122307763 PROJECT:  0612050004
 WALDPORT RS-REPLACE  UNDERGROUND  STORAGE TANK
 ACCT:  12 DEPT FUND RCRA
 SIUSLAW NF
 CORVALLIS                         OR

 OR-122309140  PROJECT:  0615060002
 WOLF CREEK CAMPGROUND  WATER SYSTEM
 ACCT: 25 SWA  FUND SDWA
UMPQUA NATIONAL FOREST
ROSEBURG                         OR

OR-122309999  PROJECT:  0600000000
MULTI-WATER SHED
ACCT:  24 SWA  FUND CWA-NPS
RESIDENCE
BLUE RIVER                       OR
       15.0   ESDF    93/12   91/04  MEDIUM   SOLID    ADEQUATE  ADEQUATE   ADEQUATE
                                         WASTE     DESIGN    TIMING    ESTIMATE
       35.0   ESDF    89/12   90/09 MEDIUM   TOXIC    ADEQUATE  ADEQUATE   ADEQUATE
                                       SUBSTANCE   DESIGN    TIMING    ESTIMATE
       40.0   PSDF    90/12  90/09 MEDIUM  DRINKING  ADEQUATE  ADEQUATE   ADEQUATE
                                         WATER     DESIGN    TIMING    ESTIMATE
      50.0   ESDF   93/12  97/09   LOW     SOLID    ADEQUATE  ADEQUATE   ADEQUATE
                                         WASTE     DESIGN    TIMING    ESTIMATE
       3.0  ESDP   86/12  90/12  HIGH   DRINKING  ADEQUATE  ADEQUATE   ADEQUATE
                                         WATER     DESIGN    TIMING    ESTIMATE
   1,600.0  OTHR   87/12  90/09 MEDIUM   WATER    ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE

-------
                                 FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                         DEPARTMENT OF AGRICULTURE               FOREST SERVICE
                PROJECT IDENTIFICATION
                     REQ    EST   PROJECT
  BUDGET     COMPL   COMPL  COMPL ASSESS- MEDIA
(THOUSANDS)  STATUS  DATE   DATE  MENT    TYPE
                                                                      USDA-104
  ADEQUACY OF PROJECT
ENGIN-
EERING    TIME      COST
OR-1E2313091 PROJECT: 0620020001
OLD SHAWS LOG CAMP-OLD CREOSOTE PIT
ACCT: 11 DEPT FUND CERCLA
WINEMA NATIONAL FOREST
KLAMATH FALLS                    OR

OR-122313971 PROJECT: 0620030001
LAKE OF THE WOODS-REPLACE OLD PIPES/VALVES
ACCT: 25 SWA FUND SDWA
WINEMA NATIONAL FOREST
KLAMATH FALLS                    OR

OR-122313971 PROJECT: 0620026050
CHILOQUIN RS, UST
ACCT: 12 DEPT FUND RCRA
WINEMA NATIONAL FOREST
KLAMATH FALLS                    OR

OR-122314004 PROJECT: 0615060006
HORSESHOE BEND CG WATER SYSTEM UPGRADE
ACCT: 25 SWA FUND SDWA
UMPQUA NATIONAL FOREST
ROSEBURS                         OR

OR-122367103 PROJECT: 0615030007
THIELSEN VIEW CG WATER SYSTEM
ACCT: 25 SWA FUND SDWA
UMPqUA NATIONAL FOREST
ROSEBURG                         OR

OR-122399999 PROJECT: 2600002806
ASBESTOS SURVEY/REMOVAL
ACCT: 27 SWA FUND TSCA
HEADQUARTERS SITE
OTIS                             OR
       25.0  ESDP   86/10  90/09  HIGH    WATER    ADEQUATE   ADEQUATE    ADEQUATE
                                                    DESIGN     TIMING     ESTIMATE
        5.0  ESRO   93/12  92/03  LOW    DRINKING  ADEQUATE  ADEQUATE   ADEQUATE
                                          WATER      DESIGN    TIMING    ESTIMATE
       75.0  ESDF   93/12  91/02  MEDIUM    SOLID    ADEQUATE  ADEQUATE   ADEQUATE
                                          WASTE     DESIGN    TIMING    ESTIMATE
       34.0  PSDF   90/12   90/12  MEDIUM  DRINKING  ADEQUATE  ADEQUATE   ADEQUATE
                                         WATER     DESIGN    TIMING    ESTIMATE
        3.0  PSDF   90/12   90/12 MEDIUM  DRINKING  ADEQUATE  ADEQUATE   ADEQUATE
                                         WATER     DESIGN    TIMING    ESTIMATE
        2.0  ESDF    00/01   90/09 MEDIUM   TOXIC    ADEQUATE  ADEQUATE   ADEQUATE
                                       SUBSTANCE   DESIGN    TIMING    ESTIMATE

-------
                                  FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                          DEPARTMENT OF AGRICULTURE               FOREST SERVICE
                 PROJECT IDENTIFICATION
                     REQ     EST   PROJECT
  BUDGET     COMPL    COMPL   COMPL ASSESS- MEDIA
(THOUSANDS)   STATUS   DATE    DATE  MENT    TYPE
                                                                                                                      USDA-105
  ADEQUACY OF PROJECT
ENGIN-
EERING    TIME      COST
 PA-122307686 PROJECT:  0919030501
 BRADFORD RANGER STATION
 ACCT: 25 SWA FUND SDWA
 ALLEGHENY N.F.
 WARREN                           PA

 PA-122307686 PROJECT:  0919000504
 4 SPRINGS - DISINFECTION
 ACCT: 25 SWA FUND SDWA
 ALLEGHENY N.F.
 WARREN                           PA

 PA-122307686 PROJECT:  0919000518
 WELL  CHLORINATION
 ACCT:  25 SWA FUND SDWA
 ALLEGHENY N.F.
 WARREN                           PA

 PA-122307686 PROJECT:  0919040105
 NANSEN CHEMICAL SITE
 ACCT:  11  DEPT FUND CERCLA
 ALLEGHENY  N.F.
 WARREN                           PA

 PA-122307686 PROJECT:  0919000330
 MCKEE  TRACT  PLUG  WELLS
 ACCT:  23  SWA FUND CWA-PS
 ALLEGHENY  N.F.
 WARREN                            PA

 PA-122307686 PROJECT:  0919000331
 MORRISON  LEASE PLUG WELLS
ACCT:  23 SWA FUND CWA-PS
ALLEGHENY N.F.
WARREN                            PA
      134.0   ESDP    91/09   90/09  HIGH   DRINKING  ADEQUATE  ADEQUATE   ADEQUATE
                                         WATER     DESIGN    TIMING    ESTIMATE
       25.0   ESDF    90/12   90/09 MEDIUM  DRINKING    NOT
                                         WATER     AVAIL
          NOT
         AVAIL
        9.0   PSDF    90/12  90/12 MEDIUM  DRINKING    NOT       NOT
                                         WATER     AVAIL     AVAIL
      204.0   ESDP   86/10  90/09  HIGH    CERCLA     NOT
                                                   AVAIL
          NOT
         AVAIL
      154.0  ESDP   87/12  90/12  HIGH    WATER
      114.0  ESDP   87/12  90/12  HIGH    WATER
 NOT
AVAIL
                     NOT
                    AVAIL
 NOT
AVAIL
                                                  ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
                                                  ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE

-------
                                 FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                         DEPARTMENT OF AGRICULTURE               FOREST SERVICE
                PROJECT IDENTIFICATION
                     REQ    EST   PROJECT
  BUDGET     COMPL   COMPL  COMPL ASSESS- MEDIA
(THOUSANDS)  STATUS  DATE   DATE  MENT    TYPE
                                                                                                                      USDA-106
  ADEQUACY OF PROJECT
ENGIN-
EERING    TIME      COST
PA-122307686 PROJECT: 0919000326
STALEY AND LUKE PLUG WELLS
ACCT: 23 SWA FUND CWA-PS
ALLEGHENY N.F.
WARREN                           PA

PA-122307686 PROJECT: 0919000328
GLADYS BAIRD ESTATE PLUG WELLS
ACCT: 23 SWA FUND CWA-PS
ALLEGHENY N.F.
WARREN                           PA

PA-122316232 PROJECT: 2422200013
GREY TOWERS ASBESTOS REMOVAL
ACCT: 27 SWA FUND TSCA
GREY TOWERS
MILFORD                          PA

PA-122319598 PROJECT: 2400000015
NE FOREST EXP ASBESTOS DETECTION STATEWIDE
ACCT: 27 SWA FUND TSCA
FORESTRY SCIENCES LAB WARREN
WARREN                           PA

PR-122360186 PROJECT: 0816010005
EL VESDE WATER SYSTEM
ACCT: 25 SWA FUND SDWA
CARIBBEAN NF
RIO PIEDRAS                      PR

PR-122360186 PROJECT: 0816010006
QUEBRADA GRANDE WATER SYSTEM
ACCT: 25 SWA FUND SDWA
CARIBBEAN NF
RIO PIEDRAS                      PR
      122.0  ESDP   87/12  90/12  HIGH    WATER     ADEQUATE  ADEQUATE   ADEQUATE
                                                    DESIGN    TIMING    ESTIMATE
       26.0  ESDP   87/12  90/12   HIGH     WATER      NOT       NOT        NOT
                                                   AVAIL     AVAIL      AVAIL
      100.0  PSDF   91/09  91/01  MEDIUM    AIR     ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
       75.0  PSDF   91/09  91/01  MEDIUM    AIR
                                                  ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
       20.0  ESDF   91/09   91/01  HIGH   DRINKING  ADEQUATE  ADEQUATE   ADEQUATE
                                         WATER     DESIGN    TIMING    ESTIMATE
       15.0  PSDF
                           91/09 MEDIUM  DRINKING  ADEQUATE  ADEQUATE   ADEQUATE
                                         WATER     DESIGN    TIMING    ESTIMATE

-------
                                  FEDERAL AGENCY POLLUTION ABATEMENT  PLAN  FOR  FISCAL YEAR  1991

                          DEPARTMENT OF AGRICULTURE               FOREST SERVICE
                 PROJECT IDENTIFICATION
                     REQ    EST    PROJECT
  BUDGET     COMPL   COMPL   COMPL  ASSESS- MEDIA
(THOUSANDS)   STATUS  DATE    DATE   MENT    TYPE
                                                                     USDA-107
  ADEQUACY OF PROJECT
ENGIN-
EERING    TIME      COST
 FR-122360186 PROJECT: 0816010007
 PUENTE ROTO WATER SYSTEM
 ACCT: 25 SWA FUND SDWA
 CARIBBEAN NF
 RIO PIEDRAS                      PR

 PR-122360186 PROJECT: 0816010008
 CATALINA WC WATER SYS
 ACCT:  25 SWA FUND SDWA
 CARIBBEAN NF
 RIO PIEDRAS                      PR

 PR-122360186 PROJECT:  0816010002
 QUEBRADA GRANDE  SEWAGE SYSTEM
 ACCT:  23 SWA FUND  CWA-PS
 CARIBBEAN NF
 RIO  PIEDRAS                      PR

 PR-122360186 PROJECT:  0816010003
 PUENTE ROTO RA SEWAGE  SYSTEM
 ACCT:  23 SWA FUND  CWA-PS
 CARIBBEAN NF
 RIO  PIEDRAS                      PR

 SC-122307727 PROJECT:  0812070002
 WOODS FERRY  RECREATION AREA WATER SYSTEM
 ACCT: 25  SWA FUND  SDWA
 FM i S NATIONAL FOREST
 COLUMBIA                         SC

 SC-122313973  PROJECT: 2918140005
CLEANUP SANTEE EF MERCURY IN SEPTIC TANK
ACCT: 11 DEPT FUND CERCLA
SOUTHEASTERN  STATION
ASHEVILLE                        SC
                                                        15.0   PSDF
                           91/09 MEDIUM  DRINKING  ADEQUATE  ADEQUATE   ADEQUATE
                                         WATER     DESIGN    TIMING    ESTIMATE
        5.0   ESRO    92/09  91/09 MEDIUM  DRINKXNG  ADEQUATE  ADEQUATE   ADEQUATE
                                         WATER     DESIGN    TIMING    ESTIMATE
       15.0   PSDF
       10.0  PSDF
                          91/09 MEDIUM   WATER    ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
                          91/09  HIGH    WATER    ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
      50.0  PSDF   90/12  91/05  HIGH   DRINKING  ADEQUATE  ADEQUATE   ADEQUATE
                                         WATER     DESIGN    TIMING    ESTIMATE
       5.0  ESDF   11/01  91/02 MEDIUM   CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE

-------
                                 FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                         DEPARTMENT OF AGRICULTURE               FOREST SERVICE
                PROJECT IDENTIFICATION
                     REQ    EST   PROJECT
  BUDGET     COMPL   COMPL  COMPL ASSESS- MEDIA
(THOUSANDS)  STATUS  DATE   DATE  MENT    TYPE
                                                                      USDA-108
  ADEQUACY OF PROJECT
ENGIN-
EERING    TIME      COST
SD-122317518 PROJECT: 0203000001
VAULT WASTE DUMP STA/UTILITY CONTRACT
ACCT: 23 SWA FUND CWA-PS
BLACK HILLS NF
CUSTER                           SD

SD-122317518 PROJECT: 0203000002
FOREST WIDE CHEM TOILET CONVERSION
ACCT: 23 SWA FUND CWA-PS
BLACK HILLS NF
CUSTER                           3D

TN-122307718 PROJECT: 0804030010
OCOEE HAND PUMPS
ACCT: 25 SWA FUND SDWA
CHEROKEE N.F.
CLEVELAND                        TN

TN-122307718 PROJECT: 08040*0009
TELLICO HAND PUMPS
ACCT: 25 SWA FUND SDWA
CHEROKEE N.F.
CLEVELAND                        TN

TN-122307718 PROJECT: 0804060017
JACOBS CREEK CCC WATER SUPPLY
ACCT: 25 SWA FUND SDWA
CHEROKEE N.F.
CLEVELAND                        TN

TN-122307718 PROJECT: 0804040018
INDIAN BOUNDARY WATER SUPPLY
ACCT: 25 SWA FUND SDWA
CHEROKEE N.F.
CLEVELAND                        TN
       20.0  ESDP   87/12  90/09 MEDIUM   WATER      NOT       NOT        NOT
                                                    AVAIL     AVAIL      AVAIL
        5.0  ESDF   94/09  91/08  LOW     WATER      NOT       NOT        NOT
                                                    AVAIL     AVAIL      AVAIL
       10.0  INOV   86/12  91/01   HIGH    DRINKING    NOT       NOT        NOT
                                         WATER     AVAIL     AVAIL      AVAIL
       11.0  INOV   86/12   91/01   HIGH   DRINKING  ADEQUATE  ADEQUATE   ADEQUATE
                                         WATER     DESIGN    TIMING    ESTIMATE
        8.0  INOV   86/12   90/09  HIGH   DRINKING    NOT       NOT        NOT
                                         WATER     AVAIL     AVAIL      AVAIL
       15.0   ESDP    86/12   91/07  HIGH   DRINKING  ADEQUATE  ADEQUATE   ADEQUATE
                                         WATER     DESIGN    TIMING    ESTIMATE

-------
                                  FEDERAL AGENCY POLLUTION  ABATEMENT PLAN FOR FISCAL YEAR 1991

                          DEPARTMENT OF AGRICULTURE                FOREST SERVICE
                 PROJECT IDENTIFICATION
                     REQ    EST   PROJECT
  BUDGET     COMPL    COMPL  COMPL ASSESS- MEDIA
(THOUSANDS)   STATUS   DATE   DATE  MENT    TYPE
                                                                     USDA-109
  ADEQUACY OF PROJECT
ENGIN-
EERING    TIME      COST
 TN-122307718 PROJECT: 0804050008
 ROCK CREEK REC AREA WATER SYSTEM
 ACCT: 25 SWA FUND SDWA
 CHEROKEE N.F.
 CLEVELAND                        TN

 TN-122307718 PROJECT: 0804020027
 MEADOW CREEK LOOKOUT WATER  SUPPLY
 ACCT: 25 SWA FUND SDWA
 CHEROKEE N.F.
 CLEVELAND                        TN

 TN-122307718 PROJECT:  0804050058
 TRI-CITIES  TANKER BASE RETARDANT
 ACCT:  23 SWA FUND CWA-PS
 CHEROKEE N.F.
 CLEVELAND                        TN

 TN-122307718 PROJECT:  0804060015
 JACOBS CREEK CCC  WASTEWATER
 ACCT:  24 SWA FUND  CWA-NPS
 CHEROKEE N.F.
 CLEVELAND                         TN

 TN-122307718 PROJECT:  0804060011
 JACOBS CREEK  REC  AREA  SANITATION
 ACCT: 23 SWA  FUND  CWA-PS
 CHEROKEE N.F.
 CLEVELAND                         TN

TN-122307718  PROJECT:  0804020012
NOLICHUCKY W.C. SANITATION
ACCT: 23 SWA  FUND  CWA-PS
CHEROKEE N.F.
CLEVELAND                         TN
       51.0   ESDP   86/12  90/12  HIGH   DRINKING    NOT
                                         WATER     AVAIL
          NOT
         AVAIL
 NOT
AVAIL
        3.5   ESDP   66/12  91/08 MEDIUM  DRINKING  ADEQUATE  ADEQUATE   ADEQUATE
                                         WATER     DESIGN    TIMING    ESTIMATE
       25.0   INOV   90/12  91/03  HIGH    WATER      NOT       NOT        NOT
                                                   AVAIL     AVAIL      AVAIL
       15.0  INOV   87/12  91/07  HIGH    WATER    ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
      116.0  ESDP   87/12  91/03  HIGH    WATER
      36.0  ESDP   87/12  91/07  HIGH    WATER
                                                  ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
                                                    NOT       NOT
                                                   AVAIL     AVAIL
                     NOT
                    AVAIL

-------
                                 FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                         DEPARTMENT OF AGRICULTURE               FOREST SERVICE
                PROJECT IDENTIFICATION
                     REQ    EST   PROJECT
  BUDGET     COMPL   COMPL  COMPL ASSESS- MEDIA
(THOUSANDS)  STATUS  DATE   DATE  MENT    TYPE
                                                                                                                      USDA-110
    ADEQUACY OF PROJECT
  ENGIN-
  EERING    TIME      COST
TN-122307718 PROJECT: 0804050022
ROCK CREEK REC AREA WASTEWATER
ACCT: 23 SWA FUND CMA-PS
CHEROKEE N.F.
CLEVELAND                        TN

TX-122307728 PROJECT: 0813020002
MERCY OIL FIELD
ACCT: 12 DEPT FUND RCRA
N.F.'S IN TEXAS
LUFKIN                           TX

TX-122307728 PROJECT: 0813040008
REMOVE UST, RAVEN WORK CTR
ACCT: 12 DEPT FUND RCRA
N.F.'S IN TEXAS
LUFKIN                           TX

TX-122307728 PROJECT: 0813020001
SAN JAC. CO.  SANITARY LANDFILL
ACCT: 12 DEPT FUND RCRA
N.F.'S IN TEXAS
LUFKIN                           TX

TX-122307728 PROJECT: 0813010004
SANDY CREEK R.A. SEWAGE DISPOSAL
ACCT: 23 SWA FUND CWA-PS
N.F.'S IN TEXAS
LUFKIN                           TX

TX-122330262 PROJECT: 0813080003
GRASSLANDS GULLY PLUGS
ACCT: 44 COMBINED FUNDS CWA-NPS
N.F.'S IN TEXAS
LUFKIN                           TX
        5.0  ESDL   87/12  92/10   HIGH     WATER
        5.0  ESDP   88/12  91/03  HIGH     SOLID
                                          WASTE
       20.0  ESDF   98/12   90/12   HIGH     SOLID
                                          WASTE
ADEQUATE  ADEQUATE   ADEQUATE
 DESIGN    TIMING    ESTIMATE
       25.0  PSDF   90/12   90/09   HIGH
        5.0  ESDP   87/12   91/03   HIGH
                                          SOLID
                                          WASTE
                                         WATER
       20.0  ESDP   87/12   90/12   HIGH    WATER
  NOT
 AVAIL
 NOT
AVAIL
ADEQUATE  ADEQUATE
 DESIGN    TIMING
ADEQUATE  ADEQUATE
 DESIGN    TIMING
                                                  ADEQUATE  ADEQUATE
                                                   DESIGN    TIMING
                                                    NOT
                                                   AVAIL
            NOT
           AVAIL
 NOT
AVAIL
          ADEQUATE
          ESTIMATE
          ADEQUATE
          ESTIMATE
                     ADEQUATE
                     ESTIMATE
            NOT
           AVAIL

-------
                                  FEDERAL AGENCY POLLUTION ABATEMENT  PLAN  FOR FISCAL YEAR 1991

                          DEPARTMENT OF AGRICULTURE               FOREST SERVICE
                 PROJECT IDENTIFICATION
                     REQ     EST    PROJECT
  BUDGET     COMPL   COMPL   COMPL  ASSESS- MEDIA
(THOUSANDS)   STATUS   DATE    DATE   MENT    TYPE
                                                                     USDA-111
  ADEQUACY OF PROJECT
ENGIN-
EERING    TIME      COST
 UT-122307590 PROJECT: 0418035018
 BEAR CANYON PICNIC AREA
 ACCT: 25 SWA FUND SDHA
 UINTA NATIONAL FOREST
 PROVO                            UT

 UT-122307592 PROJECT: 0401005016
 CAMPGROUND WATER SOURCE  INVESTIGATION
 ACCT: 25 SWA FUND SDWA
 ASHLEY NF
 VERNAL                           UT

 UT-122307592 PROJECT:  0401015002
 CANYON RIM WATER  SYSTEM  REDEVELOPMENT
 ACCT:  25 SWA FUND SDWA
 ASHLEY NF
 VERNAL                           UT

 UT-122307592  PROJECT:  0401015006
 HIDEOUT  CANYON CAMPGROUND WAT. SYS. REDEVELOPME
 ACCT:  25 SWA  FUND SDWA
 ASHLEY NF
 VERNAL                            UT

 UT-122307592  PROJECT:  0401045005
 ASPEN GROVE CAMPGROUND WATER SYSTEM REDEVELOPME
 ACCT: 25 SWA  FUND  SDWA
 ASHLEY NF
 VERNAL                           UT

UT-122307592 PROJECT:  0401013003
 FLAMMING GORGE NATIONAL RECREATION AREA
ACCT: 23 SWA FUND CWA-PS
ASHLEY NF
VERNAL                           UT
       14.0   ESDP    84/10   91/02  HIGH   DRINKING    NOT       NOT        NOT
                                         WATER     AVAIL     AVAIL      AVAIL
       24.0   ESDP   84/10  90/09  HIGH   DRINKING    NOT       NOT        NOT
                                         WATER     AVAIL     AVAIL      AVAIL
       75.0  ESDP   84/10  91/02  HIGH   DRINKING    NOT       NOT        NOT
                                         WATER     AVAIL     AVAIL      AVAIL
      50.0  ESDP   84/10  91/07  HIGH   DRINKING    NOT       NOT        NOT
                                         WATER     AVAIL     AVAIL      AVAIL
      65.0  ESDP   84/10  91/07  HIGH   DRINKING    NOT       NOT        NOT
                                         WATER     AVAIL     AVAIL      AVAIL
     140.0  OTHR   84/02  91/07 MEDIUM   WATER      NOT       NOT        NOT
                                                   AVAIL     AVAIL      AVAIL

-------
                                 FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                         DEPARTMENT OF AGRICULTURE               FOREST SERVICE
                PROJECT IDENTIFICATION
                     REQ    EST   PROJECT
  BUDGET     COMPL   COMPL  COMPL ASSESS- MEDIA
(THOUSANDS)  STATUS  DATE   DATE  MENT    TYPE
                                                                      USDA-112
  ADEQUACY OF PROJECT
ENGIN-
EERING    TIME      COST
UT-122307603 PROJECT: 0407025001
DUCK CREEK CAMPGROUND
ACCT: 25 SWA FUND SDWA
DIXIE NATIONAL FOREST
CEDER CITY                       UT

UT-122307603 PROJECT: 0407025010
WHITE BRIDGE WATER WELL
ACCT: 25 SWA FUND SDWA
DIXIE NATIONAL FOREST
CEDER CITY                       UT

UT-122307603 PROJECT: 0407025011
VERMILLION CASTLE WATER WELL
ACCT: 25 SWA FUND SDWA
DIXIE NATIONAL FOREST
CEDER CITY                       UT

UT-122307603 PROJECT: 0407045005
PINE LAKE CAMPGROUND
ACCT: 25 SWA FUND SDWA
DIXIE NATIONAL FOREST
CEDER CITY                       UT

UT-122307603 PROJECT: 0407045007
POSEY LAKE CAMPGROUND
ACCT: 25 SWA FUND SDWA
DIXIE NATIONAL FOREST
CEDER CITY                       UT

UT-122307603 PROJECT: 0407055012
SPRUCES SPRING DEVELOPMENT
ACCT: 25 SWA FUND SDWA
DIXIE NATIONAL FOREST
CEDER CITY                       UT
       15.0  ESDP   84/10  91/01   HIGH   DRINKING    NOT      NOT        NOT
                                          WATER      AVAIL      AVAIL       AVAIL
       25.0  ESDP   84/10  91/02  HIGH    DRINKING     NOT       NOT        NOT
                                          WATER     AVAIL     AVAIL      AVAIL
       25.0  ESDP   84/10  91/02   HIGH    DRINKING    NOT       NOT        NOT
                                         WATER     AVAIL     AVAIL      AVAIL
       35.0  ESDP   84/10   91/01   HIGH   DRINKING    NOT       NOT        NOT
                                         WATER     AVAIL     AVAIL      AVAIL
        1.5  ESDP   84/10   91/01  HIGH   DRINKING    NOT       NOT        NOT
                                         WATER     AVAIL     AVAIL      AVAIL
       15.0  ESDP   84/10   91/01  HIGH   DRINKING    NOT       NOT        NOT
                                         WATER     AVAIL     AVAIL      AVAIL

-------
                                  FEDERAL AGENCY  POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                          DEPARTMENT OF AGRICULTURE               FOREST SERVICE
                 PROJECT IDENTIFICATION
                    REQ    EST   PROJECT
  BUDGET     COMPL   COMPL  COMPL ASSESS- MEDIA
(THOUSANDS)   STATUS  DATE   DATE  MENT    TYPE
                                                                                                                      USDA-113
  ADEQUACY OF PROJECT
ENGIN-
EERING    TIME      COST
 UT-122307603 PROJECT:  0407015004
 JUNIPER PARK CAMPGROUND
 ACCT: 25 SWA FUND SDWA
 DIXIE NATIONAL FOREST
 CEDER CITY                      UT

 UT-122307603 PROJECT:  0407015009
 HONEYCOMB ROCK CAMPGROUND
 ACCT: 25 SWA FUND SDWA
 DIXIE NATIONAL FOREST
 CEDER CITY                      UT

 UT-122307603 PROJECT:  0407036002
 CONSTRUCT  PANGUITCH  INSECTICIDE  STORAGE BUILDIN
 ACCT:  26 SWA FUND  FIFRA
 DIXIE NATIONAL FOREST
 CEDER CITY                       UT

 UT-122307603 PROJECT:  0407026001
 CONSTRUCT CEDAR CITY INSECTICIDE STRSE BLDG
 ACCT:  26 SWA FUND  FIFRA
 DIXIE  NATIONAL  FOREST
 CEDER  CITY                       UT

 UT-122307603 PROJECT:  0407034001
 EAST  FORK (LOWER)
 ACCT:  24 SWA FUND  CWA-NPS
 DIXIE  NATIONAL  FOREST
 CEDER  CITY                       UT

UT-122307604  PROJECT:  0406046001
RICHFIELD DISTRICT PESTICIDE STORAGE
ACCT:  26 S»A  FUND  FIFRA
FISHLAKE NATIONAL  FOREST
RICHFIELD                        UT
        3.0   ESDP   84/10  91/01  HIGH   DRINKING    NOT
                                         WATER     AVAIL
          NOT
         AVAIL
        1.0   ESDP   64/10  91/03  HIGH   DRINKING    NOT       NOT
                                         WATER     AVAIL     AVAIL
       27.0   ESDF   90/10  91/02 MEDIUM PESTICIDES   NOT       NOT
                                                   AVAIL     AVAIL
       27.0   ESDF   90/10  91/02 MEDIUM PESTICIDES   NOT       NOT
                                                   AVAIL     AVAIL
       35.0  ESDP   87/07  91/01  HIGH
                                         WATER
                                                    NOT
                                                   AVAIL
      27.0  ESDF   90/10  91/02 MEDIUM PESTICIDES   NOT
                                                   AVAIL
          NOT
         AVAIL
          NOT
         AVAIL
 NOT
AVAIL
                     NOT
                    AVAIL
                     NOT
                    AVAIL
                     NOT
                    AVAIL
 NOT
AVAIL
 NOT
AVAIL

-------
                                 FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR  1991

                         DEPARTMENT OF AGRICULTURE               FOREST SERVICE
                PROJECT IDENTIFICATION
                     REQ    EST   PROJECT
  BUDGET     COMPL   COMPL  COMPL ASSESS- MEDIA
(THOUSANDS)  STATUS  DATE   DATE  MENT    TYPE
                                                                                                                     USDA-114
  ADEQUACY OF PROJECT
ENGIN-
EERING    TIME      COST
UT-122307604 PROJECT: 0*08004003
SALINA CREEK DRAINAGE
ACCT: 24 SWA FUND CWA-NPS
FISHLAKE NATIONAL FOREST
RICHFIELD                        UT

UT-122307605 PROJECT: 0410016003
EPHRAIM A. S. PESTICIDE BUILDING
ACCT: 26 SWA FUND FIFRA
MANTI-LASAL NATIONAL FOREST
PRICE                            UT

UT-122307605 PROJECT: 0410041002
LASAL 91, BLACK HAT MINE
ACCT: 11 DEPT FUND CERCLA
MANTI-LASAL NATIONAL FOREST
PRICE                            UT

UT-122307605 PROJECT: 0410041003
LASAL JUNCTION »67, YELLOW CIRCLE GROUP MINES
ACCT: 11 DEPT FUND CERCLA
MANTI-LASAL NATIONAL FOREST
PRICE                            UT

UT-122307605 PROJECT: 0410041004
GRAY DAUN MINES (LASAL NOS. 5-7)
ACCT: 11 DEPT FUND CERCLA
MANTI-LASAL NATIONAL FOREST
PRICE                            UT

UT-122307605 PROJECT: 0410041005
LASAL «4, FIREFLY-PYGMY MINE
ACCT: 11 DEPT FUND CERCLA
MANTI-LASAL NATIONAL FOREST
PRICE                            UT
      200.0  ESDP   87/07  91/02   HIGH     WATER      NOT       NOT
                                                   AVAIL     AVAIL
       18.0  OTHR   90/10  91/02  MEDIUM  PESTICIDES   NOT       NOT
                                                   AVAIL     AVAIL
       15.0  ESDP   86/10   90/09  HIGH    CERCLA     NOT       NOT
                                                   AVAIL     AVAIL
       15.0  ESDP   86/10   90/09  HIGH    CERCLA
       15.0  ESDP   86/10   90/09  HIGH    CERCLA
                                                    NOT
                                                   AVAIL
                                                    NOT
                                                   AVAIL
         NOT
        AVAIL
         NOT
        AVAIL
       15.0   ESDP   86/10   90/09  HIGH    CERCLA     NOT       NOT
                                                   AVAIL     AVAIL
                     NOT
                    AVAIL
                     NOT
                    AVAIL
                     NOT
                    AVAIL
 NOT
AVAIL
 NOT
AVAIL
                    NOT
                   AVAIL

-------
                                  FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                          DEPARTMENT OF AGRICULTURE               FOREST SERVICE
                 PROJECT IDENTIFICATION
                     REQ     EST   PROJECT
  BUDGET     COMPL    COMPL   COMPL ASSESS- MEDIA
(THOUSANDS)   STATUS   DATE    DATE  MENT    TYPE
                                                                     USDA-115
  ADEQUACY OF PROJECT
ENGIN-
EERING    TIME      COST
 UT-122307605 PROJECT:  0410051001
 BEARS EARS fill, REX GROUP MINES
 ACCT: 11 DEPT FUND CERCLA
 MANTI-LASAL NATIONAL FOREST
 PRICE                            UT

 UT-122307605 PROJECT:  0410051006
 KING EDWARD MINE  (MT LINNAEUS NOS. 4,5,6,422)
 ACCT: 11 DEPT FUND  CERCLA
 MANTI-LASAL NATIONAL FOREST
 PRICE                            UT

 UT-122307605 PROJECT:  0410051007
 MT  LINNAEUS SI, LAURA  MINE
 ACCT:  11  DEPT FUND  CERCLA
 MANTI-LASAL NATIONAL FOREST
 PRICE                             UT

 UT-122307605  PROJECT:  0410051008
 MT  LINNAEUS S14, HORSESHOE  «1
 ACCT:  11  DEPT  FUND  CERCLA
 MANTI-LASAL NATIONAL FOREST
 PRICE                             UT

 UT-122307605 PROJECT:  0410051009
 BRUSHY BASIN 831 (MINE)
 ACCT:  11 DEPT  FUND  CERCLA
 MANTI-LASAL NATIONAL FOREST
 PRICE                             UT

bT-122307605 PROJECT:  0410024001
SWALES
ACCT: 24 SWA FUND CWA-NPS
MANTI-LASAL NATIONAL FOREST
PRICE                            UT
       15.0   ESDP   66/10  90/09  HIGH    CERCLA
       15.0   ESDP   86/10  90/09  HIGH    CERCLA
       15.0   ESDP   86/10  91/06  HIGH    CERCLA
       10.0  ESDP   86/10  90/09  HIGH    CERCLA
      10.0  ESDP   86/10  90/09  HIGH    CERCLA
      12.0  OTHR   87/07  91/09 MEDIUM   WATER
                                                    NOT
                                                   AVAIL
                                                    NOT
                                                   AVAIL
                                                    NOT
                                                   AVAIL
                                                    NOT
                                                   AVAIL
                                                    NOT
                                                   AVAIL
                                                    NOT
                                                   AVAIL
          NOT
         AVAIL
          NOT
         AVAIL
          NOT
         AVAIL
          NOT
         AVAIL
          NOT
         AVAIL
          NOT
         AVAIL
 NOT
AVAIL
 NOT
AVAIL
 NOT
AVAIL
 NOT
AVAIL
 NOT
AVAIL
 NOT
AVAIL

-------
                                 FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                         DEPARTMENT OF AGRICULTURE               FOREST SERVICE
                PROJECT IDENTIFICATION
                     REQ    EST   PROJECT
  BUDGET     COMPL   COMPL  COMPL ASSESS- MEDIA
(THOUSANDS)  STATUS  DATE   DATE  MENT    TYPE
                                                                      USDA-116
  ADEQUACY OF PROJECT
ENGIN-
EERING    TIME      COST
UT-122307605 PROJECT: 0410033001
STUART GUARD STATION SEWER
ACCT: 23 SWA FUND CWA-PS
MANTI-LASAL NATIONAL FOREST
PRICE                            UT

UT-122307615 PROJECT: 0419075003
MALIBU/BERDIN/DEWITT WATER SYSTEM
ACCT: 25 SWA FUND SDWA
WASATCH-CACHE NATIONAL FOREST
SALT LAKE CITY                   UT

UT-122307615 PROJECT: 0419075005
BRIDGER PICNIC AREA WATER SYSTEM
ACCT: 25 SWA FUND SDWA
WASATCH-CACHE NATIONAL FOREST
SALT LAKE CITY                   UT

UT-122307615 PROJECT: 0419075006
LEWIS TURNER CAMPGROUND WATER SYSTEM
ACCT: 25 SWA FUND SDWA
WASATCH-CACHE NATIONAL FOREST
SALT LAKE CITY                   UT

UT-122307615 PROJECT: 0419075009
FRIENDSHIP/BLACKSMITH WATER SYSTEM
ACCT: 25 SWA FUND SDWA
WASATCH-CACHE NATIONAL FOREST
SALT LAKE CITY                   UT

UT-122307615 PROJECT: 0419045007
HAYDEN FORK CAMPGROUND WATER SYSTEM
ACCT: 25 SWA FUND SDWA
WASATCH-CACHE NATIONAL FOREST
SALT LAKE CITY                   UT
       45.0  OTHR   84/02  91/07 MEDIUM   WATER      NOT       NOT        NOT
                                                    AVAIL     AVAIL      AVAIL
      227.0  ESDP   84/10  90/09  HIGH   DRINKING    NOT       NOT         NOT
                                          WATER      AVAIL     AVAIL      AVAIL
       12.0  ESDP   84/10  91/07  HIGH    DRINKING    NOT       NOT        NOT
                                          WATER     AVAIL     AVAIL      AVAIL
      112.0  ESDP   84/10   91/07   HIGH   DRINKING    NOT       NOT        NOT
                                         WATER     AVAIL     AVAIL      AVAIL
      132.0  ESDP   84/10   91/07  HIGH   DRINKING    NOT       NOT        NOT
                                         WATER     AVAIL     AVAIL      AVAIL
      103.0   ESDP    84/10   91/07  HIGH   DRINKING    NOT       NOT        NOT
                                         MATER     AVAIL     AVAIL      AVAIL

-------
                                  FEDERAL AGENCY POLLUTION ABATEMENT  PLAN  FOR FISCAL YEAR 1991

                          DEPARTMENT OF AGRICULTURE               FOREST SERVICE
                 PROJECT IDENTIFICATION
                     REQ     EST    PROJECT
  BUDGET     COMPL    COMPL   COMPL  ASSESS- MEDIA
(THOUSANDS)   STATUS   DATE    DATE   MENT    TYPE
                                                                     USDA-117
   ADEQUACY OF PROJECT
 ENGIN-
 EERING    TIME      COST
 UT-122307615 PROJECT: 0419045008
 EAST FORK BEAR RIVER WATER SYSTEM
 ACCT: 25 SWA FUND SDWA
 WASATCH-CACHE NATIONAL FOREST
 SALT LAKE CITY                   UT

 UT-122307615 PROJECT: 0419055010
 200P LAKE WATER SYSTEM
 ACCT: 25 SWA FUND SDWA
 WASATCH-CACHE NATIONAL FOREST
 SALT LAKE CITY                   UT

 UT-122307615 PROJECT:  0419065004
 MAGPIE CAMPGROUND WATER  SYSTEM
 ACCT:  25 SWA FUND SDWA
 WASATCH-CACHE  NATIONAL FOREST
 SALT LAKE CITY                    UT

 UT-122307615 PROJECT:  0419033002
 SOAPSTONE SEWERLINE
 ACCT: 23 SWA FUND  CWA-PS
 WASATCH-CACHE NATIONAL FOREST
 SALT  LAKE CITY                    UT

 UT-122307615 PROJECT:  0419043005
 BEAR RIVES SEWAGE  TREATMENT PLANT
 ACCT: 23  SWA FUND  CWA-PS
 WASATCH-CACHE NATIONAL FOREST
 SALT  LAKE CITY                   UT

UT-122307615 PROJECT:  0400004001
REGION WIDE NPS INVESTIGATION
ACCT: 24  SKA FUND CWA-NPS
WASATCH-CACHE NATIONAL FOREST
SALT LAKE CITY                   UT
      109.0   ESDP    84/10   91/07  HIGH   DRINKING
                                         WATER
      103.0   ESDP   84/10   91/07  HIGH   DRINKING
                                         WATER
       90.0   ESDP   84/10  91/07  HIGH   DRINKING
                                         WATER
      82.0  ESDP   84/02  91/07  HIGH    WATER
       10.5  ESDP   84/02  91/02  HIGH    WATER
      150.0  ESDF   87/07  90/10 MEDIUM   WATER
 NOT
AVAIL
 NOT
AVAIL
 NOT
AVAIL
                                                    NOT
                                                   AVAIL
                                                    NOT
                                                   AVAIL
                                                    NOT
                                                   AVAIL
 NOT
AVAIL
 NOT
AVAIL
 NOT
AVAIL
           NOT
          AVAIL
           NOT
          AVAIL
           NOT
          AVAIL
 NOT
AVAIL
 NOT
AVAIL
 NOT
AVAIL
            NOT
           AVAIL
            NOT
           AVAIL
            NOT
           AVAIL

-------
                                 FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                         DEPARTMENT OF AGRICULTURE               FOREST SERVICE
                PROJECT IDENTIFICATION
                                    RE<3    EST   PROJECT
                 BUDGET     COMPL   COMPL  COMPL ASSESS- MEDIA
               (THOUSANDS)  STATUS  DATE   DATE  MENT    TYPE
                                                                                     USDA-118
   ADEQUACY OF PROJECT
 ENGIN-
 EERING    TIME      COST
UT-122307615 PROJECT: 0*19013000
REDMAN CAMPGROUND SEWER
ACCT: 23 SWA FUND CWA-PS
WASATCH-CACHE NATIONAL FOREST
SALT LAKE CITY                   UT

UT-122307615 PROJECT: 0419073004
LOGAN RANGER DISTRICT DEV. RECREATION
ACCT: 23 SWA FUND CWA-PS
WASATCH-CACHE NATIONAL FOREST
SALT LAKE CITY                   UT
UT-122307615 PROJECT: 0418024002
MARY ELLEN GULCH
ACCT: 24 SWA FUND CWA-NPS
WASATCH-CACHE NATIONAL FOREST
SALT LAKE CITY
UT-122307615 PROJECT: 0418024003
LOWER BOG MINE
ACCT: 24 SWA FUND CWA-NPS
WASATCH-CACHE NATIONAL FOREST
SALT LAKE CITY

UT-122307615 PROJECT: 0418034007
MILL FORK QUAD
ACCT: 24 SWA FUND CWA-NPS
WASATCH-CACHE NATIONAL FOREST
SALT LAKE CITY
                                 UT
UT
                                 UT
UT-122307615 PROJECT: 0418034009
INDIAN CREEK-TUCKER-GIL
ACCT: 24 SWA FUND CWA-NPS
WASATCH-CACHE NATIONAL FOREST
SALT LAKE CITY                   UT
                      20.0  PSDF   84/02  91/01 MEDIUM   WATER
                     159.0  OTHR   84/02  91/07 MEDIUM   WATER
                       5.0  OTHR   87/07  90/12 MEDIUM   WATER
                       1.5  OTHR   87/07  90/10 MEDIUM   WATER
                      12.0  OTHR   87/07  91/09 MEDIUM   MATER
                                                        4.0  OTHR   87/07  91/09 MEDIUM   WATER
 NOT
AVAIL
 NOT
AVAIL
 NOT
AVAIL
 NOT
AVAIL
                                                                    NOT
                                                                   AVAIL
                                                                   NOT
                                                                  AVAIL
                                                                              NOT
                                                                             AVAIL
                                                                              NOT
                                                                             AVAIL
                                                                              NOT
                                                                             AVAIL
                                                                              NOT
                                                                             AVAIL
           NOT
          AVAIL
           NOT
          AVAIL
  NOT
 AVAIL
  NOT
AVAIL
 NOT
AVAIL
 NOT
AVAIL
 NOT
AVAIL
 NOT
AVAIL

-------
                                  FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR  FISCAL YEAR  1991

                          DEPARTMENT OF AGRICULTURE               FOREST  SERVICE
                 PROJECT IDENTIFICATION
                     REQ    EST    PROJECT
  BUDGET     COMPL   COMPL   COMPL  ASSESS- MEDIA
(THOUSANDS)   STATUS  DATE    DATE   MENT    TYPE
                                                                     USDA-119
  ADEQUACY OF PROJECT
ENGIN-
EERING    TIME      COST
 UT-122307615 PROJECT: 0418034012
 DIAMOND FORK
 ACCT: 24 SWA FUND CWA-NPS
 WASATCH-CACHE NATIONAL FOREST
 SALT LAKE CITY
                                  UT
 UT-122307615 PROJECT:  0419043011
 EVANSTON RANGER DISTRICT ADMINSTRATION SITE
 ACCT:  23 SWA FUND CWA-PS
 WASATCH-CACHE NATIONAL FOREST
 SALT LAKE CITY                   UT

 UT-122307615 PROJECT:  0419013007
 SPRUCES  AND  JORDAN PINES SANITATION
 ACCT:  23 SWA FUND CWA-PS
 WASATCH-CACHE NATIONAL FOREST
 SALT LAKE  CITY                   UT

 UT-122307615 PROJECT:  0419013003
 SALT LAKE  RANGER  DISTRICT DEV RECREATION
 ACCT:  23 SWA FUND  CWA-PS
 WASATCH-CACHE  NATIONAL FOREST
 SALT LAKE  CITY                   UT

 VA-122307681  PROJECT:  0814040016
 SKULLS GAP PICNIC  AREA WATER SYSTEM
 ACCT:  25 SWA FUND  SDWA
 JEFFERSON NF
 ROANOKE                           VA

VA-122307681 PROJECT:  0814040017
COMERS ROCK  PICNIC AREA  WATER
ACCT: 25 SWA FUND  SDWA
JEFFERSON NF
ROANOKE                           VA
        3.0   OTHR    87/07   91/09  MEDIUM   WATER
       44.0   OTHR   64/02   91/02 MEDIUM   WATER
                                                    NOT
                                                   AVAIL
                                                    NOT
                                                   AVAIL
          NOT
         AVAIL
          NOT
         AVAIL
       15.0  OTHR   99/12  91/03 MEDIUM   WATER      NOT       NOT
                                                   AVAIL     AVAIL
     275.0  OTHR   84/02  91/07 MEDIUM   WATER      NOT       NOT
                                                   AVAIL     AVAIL
 NOT
AVAIL
 NOT
AVAIL
                     NOT
                    AVAIL
                     NOT
                    AVAIL
      15.0  INOV   86/12  91/01  HIGH   DRINKING  ADEQUATE  ADEQUATE   ADEQUATE
                                         WATER     DESIGN    TIMING    ESTIMATE
      15.0  INOV   86/12  91/01  HIGH   DRINKING  ADEQUATE  ADEQUATE   ADEQUATE
                                         WATER     DESIGN    TIMING    ESTIMATE

-------
                                 FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                         DEPARTMENT OF AGRICULTURE               FOREST SERVICE
                PROJECT IDENTIFICATION
                     REQ    EST   PROJECT
  BUDGET     COMPL   COMPL  COMPL ASSESS- MEDIA
(THOUSANDS)  STATUS  DATE   DATE  MENT    TYPE
                                                                      USDA-120
  ADEQUACY OF PROJECT
ENGIN-
EERING    TIME      COST
VA-122307681 PROJECT: 0814040021
SHEPHERDS CORNER PICNIC AREA WATER
ACCT: 25 SWA FUND SDWA
JEFFERSON NF
ROANOKE                          VA

VA-122307681 PROJECT: 081*020004
HIGH KNOB REC. AREA WATER SYSTEM
ACCT: 25 SWA FUND SDWA
JEFFERSON NF
ROANOKE                          VA

VA-122307681 PROJECT: 081*020020
HANGING ROCK PICNIC AREA WATER
ACCT: 25 SWA FUND SDWA
JEFFERSON NF
ROANOKE                          VA

VA-122307681 PROJECT: 0814050019
STEEL BRIDGE PICNIC AREA WATER
ACCT: 25 SWA FUND SDWA
JEFFERSON NF
ROANOKE                          VA

VA-122307681 PROJECT: 0814040013
SUGAR GROVE W.C. "PENTA" STORAGE
ACCT: 11 DEPT FUND CERCLA
JEFFERSON NF
ROANOKE                          VA

VA-122307681 PROJECT: 0814010002
MONTGOMERY CO. SANITARY LANDFILL
ACCT: 12 DEPT FUND RCRA
JEFFERSON NF
ROANOKE                          VA
       15.0  INOV   86/12  91/01  HIGH   DRINKING  ADEQUATE   ADEQUATE    ADEQUATE
                                          WATER     DESIGN    TIMING    ESTIMATE
       10.0  INOV   86/12  90/09  HIGH   DRINKING    NOT       NOT        NOT
                                          WATER     AVAIL     AVAIL      AVAIL
       15.0  INOV   86/12  91/01   HIGH   DRINKING  ADEQUATE  ADEQUATE   ADEQUATE
                                          WATER     DESIGN    TIMING    ESTIMATE
       15.0  ESDP   86/12  93/01   HIGH    DRINKING    NOT       NOT        NOT
                                          WATER     AVAIL     AVAIL      AVAIL
       50.0  ESDP   86/10  91/01   HIGH    CERCLA     NOT       NOT        NOT
                                                   AVAIL     AVAIL      AVAIL
       15.0  INOV   86/10   91/01  HIGH    SOLID      NOT       NOT        NOT
                                         WASTE     AVAIL     AVAIL      AVAIL

-------
                                  FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                          DEPARTMENT OF AGRICULTURE               FOREST SERVICE
                 PROJECT IDENTIFICATION
                     REQ    EST   PROJECT
  BUDGET     COMPL    COMPL  COMPL ASSESS- MEDIA
(THOUSANDS)   STATUS   DATE   DATE  MENT    TYPE
                                                                                                                     USDA-121
    ADEQUACY OF PROJECT
  ENGIN-
  EERING    TIME      COST
 VA-122307681  PROJECT:  0814020022
 FLATWOODS CCC DUMP
 ACCT:  12 DEPT FUND  RCRA
 JEFFERSON NF
 ROANOKE                          VA

 VA-122307681  PROJECT:  0814050001
 BOTETOURT CO.  SANITARY LANDFILL
 ACCT:  12 DEPT FUND  RCRA
 JEFFERSON NF
 ROANOKE                          VA

 VA-122307681  PROJECT:  0814020005
 FLATWOODS CCC  S.T.P
 ACCT:  23 SWA  FUND CWA-PS
 JEFFERSON NF
 ROANOKE                          VA

 VA-122307684  PROJECT: 080S050013
 SHER RA  REPL REMAININ3 EXISTING WTRLNE WITH NEW
 ACCT:  25  SWA FUND SDWA
 GEORGE WASHINGTON
 HARRISONBURG                     VA

 VA-122307684 PROJECT: 0808040008
 ELIZ FURNACE RA REPL DISTR. PIPE & DEVEL WELL
 ACCT:  25  SWA FUND SDWA
 GEORGE WASHINGTON
HARRISONBURG                     VA

VA-122307684 PROJECT: 0808040012
NEW MARKET GAP PA. REPL VAULT TOILET
ACCT:  23 SWA FUND CWA-PS
GEORGE WASHINGTON
HARRISONBURG                     VA
                                                       15.0  INOV   86/10  91/06  HIGH
       15.0   INOV   86/10  91/01  HIGH
                                         SOLID
                                         WASTE
                                         SOLID
                                         WASTE
  NOT       NOT
 AVAIL     AVAIL
 NOT
AVAIL
ADEQUATE  ADEQUATE   ADEQUATE
 DESIGN    TIMING    ESTIMATE
       10.0   INOV   86/12  91/06  HIGH    WATER    ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
      200.0   ESDP   87/09  91/03 MEDIUM  DRINKING    NOT       NOT
                                         WATER     AVAIL     AVAIL
      300.0   ESRO   87/09  91/05 MEDIUM  DRINKING    NOT
                                         WATER     AVAIL
       33.0  ESDP   87/09  91/04  HIGH
                                         WATER
                                                    NOT
                                                   AVAIL
            NOT
           AVAIL
            NOT
           AVAIL
                       NOT
                      AVAIL
 NOT
AVAIL
 NOT
AVAIL

-------
                                 FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                         DEPARTMENT OF AGRICULTURE               FOREST SERVICE
                PROJECT IDENTIFICATION
                     REQ    EST   PROJECT
  BUDGET     COMPL   COMPL  COMPL ASSESS- MEDIA
(THOUSANDS)  STATUS  DATE   DATE  MENT    TYPE
                                                                                                                      USDA-122
  ADEQUACY OF PROJECT
ENGIN-
EERING    TIME      COST
VA-122307684 PROJECT: 0808050002
VESUVIOUS SURFACE MINE CORR OF ABAND MINE
ACCT: 24 SWA FUND CWA-NPS
GEORGE WASHINGTON
HARRISONBURG                     VA

VA-122307684 PROJECT: 0808050003
SHERANDO RA  NEW SUBSURFACE ABSORPTION SYS
ACCT: 23 SWA FUND CWA-PS
GEORGE WASHINGTON
HARRISONBURG                     VA

WA-122307419 PROJECT: 0621000001
CURLEW JCCC ASBESTOS REMOVAL AT DORMS
ACCT: 27 SWA FUND TSCA
COLVILLE NATIONAL FOREST
COLVILLE                         WA

WA-122307655 PROJECT: 0617020001
HOLDEN MINE PORTAL AND TAILINGS
ACCT: 11 DEPT FUND CERCLA
WENATCHEE NATIONAL FOREST
WENATCHEE                        WA

WA-122307659 PROJECT: 0603030005
CULTUS CREEK CG WATER SYSTEM REPLACEMENT
ACCT: 35 OTHER FUNDS SDWA
GIFFORD PINCHOT NF
VANCOUVER                        WA

WA-122307659 PROJECT: 0603030011
TILLICUM CG WATER SYSTEM REPLACEMENT
ACCT: 25 SWA FUND SDWA
GIFFORD PINCHOT NF
VANCOUVER                        HA
       15.0  ESDP   87/12  90/09  HIGH    WATER     ADEQUATE   ADEQUATE    ADEQUATE
                                                    DESIGN    TIMING    ESTIMATE
       80.0  ESDP   87/09  90/09  HIGH    WATER       NOT       NOT        NOT
                                                    AVAIL     AVAIL      AVAIL
       85.0  ESDF   98/12  90/12  LOW     TOXIC     ADEQUATE  ADEQUATE   ADEQUATE
                                        SUBSTANCE   DESIGN    TIMING    ESTIMATE
    8,280.0  ESDP   92/10  90/09  HIGH    CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
       69.0  ESDP   91/01   90/12  MEDIUM  DRINKING  ADEQUATE  ADEQUATE   ADEQUATE
                                         WATER     DESIGN    TIMING    ESTIMATE
       83.0  ESDP   86/12   90/12   HIGH   DRINKING  ADEQUATE  ADEQUATE   ADEQUATE
                                         WATER     DESIGN    TIMING    ESTIMATE

-------
                                  FEDERAL AGENCY POLLUTION  ABATEMENT  PLAN FOR FISCAL YEAR 1991

                          DEPARTMENT OF AGRICULTURE                FOREST SERVICE
                 PROJECT IDENTIFICATION
                     REQ    EST    PROJECT
  BUDGET     COMPL   COMPL   COMPL  ASSESS- MEDIA
(THOUSANDS)   STATUS  DATE    DATE   MENT    TYPE
                                                                     USDA-123
  ADEQUACY OF PROJECT
ENGIN-
EERING    TIME      COST
 WA-122307659 PROJECT:  0603080001
 IRON MIKE WELL RECONSTRUCTION
 ACCT: 25 SWA FUND SDWA
 GIFFORD PINCHOT NF
 VANCOUVER                        WA

 WA-122307659 PROJECT:  0603040003
 PACKWOOD LAKE GS WATER SYSTEM CONSTRUCTION
 ACCT: 25 SWA FUND SDWA
 GIFFORD PINCHOT NF
 VANCOUVER                        WA

 WA-122307659 PROJECT:  0603190001
 WIND  RIVER  FUEL STORAGE TANK  REPLACEMENT
 ACCT:  12  DEPT FUND RCRA
 GIFFORD  PINCHOT NF
 VANCOUVER                         WA

 WA-122307659 PROJECT:  0603010001
 PINE  CRK WC  FUEL  STORAGE TANK  REPLACEMENT
 ACCT:  12 DEPT FUND RCRA
 GIFFORD  PINCHOT NF
 VANCOUVER                        WA

 WA-122307761  PROJECT:  0605010002
 BAKER  LAKE CG,  HANDPUMP DISINFECTION
 ACCT:  35 OTHER  FUNDS SDWA
MT. BAKER-SNOQUALMIE NF
SEATTLE                          WA

WA-122307761  PROJECT:  0605010003
BAKER RIVER  CG-DISINFECTION TWO HANDPUMPS
ACCT: 35 OTHER  FUNDS SDWA
MT. BAKER-SNOQUALMIE NF
SEATTLE                          WA
       30.0  ESDP   86/12   90/12  MEDIUM  DRINKING  ADEQUATE  ADEQUATE   ADEQUATE
                                         WATER     DESIGN    TIMING    ESTIMATE
       22.0   PSDF    90/12   90/12 MEDIUM  DRINKING  ADEQUATE  ADEQUATE   ADEQUATE
                                         WATER     DESIGN    TIMING    ESTIMATE
       65.0   ESDF    93/12   92/12 MEDIUM   SOLID    ADEQUATE  ADEQUATE   ADEQUATE
                                         WASTE     DESIGN    TIMING    ESTIMATE
       75.0   ESDF    93/12   90/09 MEDIUM   SOLID    ADEQUATE  ADEQUATE   ADEQUATE
                                         WASTE     DESIGN    TIMING    ESTIMATE
        7.0   PSDF    90/12  90/12 MEDIUM  DRINKING  ADEQUATE  ADEQUATE   ADEQUATE
                                         WATER     DESIGN    TIMING    ESTIMATE
       13.2  PSDF   90/12  90/12 MEDIUM  DRINKING  ADEQUATE  ADEQUATE   ADEQUATE
                                         WATER     DESIGN    TIMING    ESTIMATE

-------
                                 FEDERAL A6ENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                         DEPARTMENT OF AGRICULTURE               FOREST SERVICE
                PROJECT IDENTIFICATION
                     REQ    EST   PROJECT
  BUDGET     COMPL   COMPL  COMPL ASSESS- MEDIA
(THOUSANDS)  STATUS  DATE   DATE  MENT    TYPE
                                                                      USDA-124
  ADEQUACY OF PROJECT
ENGIN-
EERING    TIME      COST
WA-122307761 PROJECT: 0605010004
CONCRETE CG-WATER SYSTEM DISINFECTION
ACCT: 35 OTHER FUNDS SDMA
MT. BAKER-SNOQUALMIE NF
SEATTLE                          MA

WA-122307761 PROJECT: 0605020006
VERLOT CG, DISINFECTION
ACCT: 35 OTHER FUNDS SDWA
MT. BAKER-SNOQUALMIE NF
SEATTLE                          WA

WA-122307761 PROJECT: 0605010005
HORSESHOE COVE CG,DISINFECTION
ACCT: 35 OTHER FUNDS SDWA
MT. BAKER-SNOQUALMIE NF
SEATTLE                          WA

WA-122307761 PROJECT: 0605010006
KOMA KULSHAN CG, DISINFECTION
ACCT: 25 SWA FUND SDWA
MT. BAKER-SNOQUALMIE NF
SEATTLE                          WA

WA-122307761 PROJECT: 0605050004
ASAHEL CURTIS CG, HANDPUMP DISINFECTION
ACCT: 35 OTHER FUNDS SDWA
MT. BAKER-SNOQUALMIE NF
SEATTLE                          WA

WA-122307761 PROJECT: 0605060002
BECKLER RIVER CG-DISINFECT HANDPUMP
ACCT: 25 SWA FUND SDWA
MT. BAKER-SNOQUALMIE NF
SEATTLE                          WA
       10.0  PSDF   90/12  90/12 MEDIUM  DRINKING  ADEQUATE  ADEQUATE   ADEQUATE
                                          WATER     DESIGN    TIMING    ESTIMATE
       20.0  PSDF   90/12  90/12 MEDIUM  DRINKING  ADEQUATE  ADEQUATE    ADEQUATE
                                          WATER     DESIGN    TIMING    ESTIMATE
       17.0  PSDF   90/12  90/12 MEDIUM  DRINKING  ADEQUATE   ADEQUATE   ADEQUATE
                                          WATER      DESIGN     TIMING    ESTIMATE
       17.0  PSDF   90/12  90/12  MEDIUM  DRINKING  ADEQUATE  ADEQUATE   ADEQUATE
                                          WATER     DESIGN    TIMING    ESTIMATE
        7.0  PSDF   90/12   90/12  MEDIUM  DRINKING  ADEQUATE  ADEQUATE   ADEQUATE
                                         WATER     DESIGN    TIMING    ESTIMATE
        7.0  PSDF   90/12   90/12  MEDIUM  DRINKING  ADEQUATE  ADEQUATE   ADEQUATE
                                         WATER     DESIGN    TIMING    ESTIMATE

-------
                                  FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                          DEPARTMENT  OF  AGRICULTURE               FOREST SERVICE
                 PROJECT IDENTIFICATION
                     REQ    EST   PROJECT
  BUDGET     COMPL    COMPL  COMPL ASSESS- MEDIA
(THOUSANDS)   STATUS   DATE   DATE  MENT    TYPE
                                                                                                                      USDA-125
  ADEQUACY OF PROJECT
ENGIN-
EERING    TIME      COST
 WA-122307761  PROJECT:  0605060003
 MILLER  RIVER  CG,DISINFECT  WATER SYSTEM
 ACCT:  25 SWA  FUND  SDWA
 MT.  BAKER-SNOQUALMIE NF
 SEATTLE                         WA

 WA-122307761  PROJECT:  0605060004
 MONEY CREEK CG,DISINFECT HANDPUMP
 ACCT: 25 SWA  FUND  SDWA
 MT.  BAKER-SNOQUALMIE NF
 SEATTLE                         WA

 WA-122307761  PROJECT:  0605070001
 BOUNDARY CREEK CG-DISINFECT WATER SYSTEM
 ACCT: 25 SWA  FUND  SDWA
 MT.  BAKER-SNOQUALMIE NF
 SEATTLE                          WA

 WA-122307761  PROJECT:  0605070002
 SILVER  SPRINGS CG,DISINFECT WATER SYSTEM
 ACCT: 25  SWA  FUND  SDWA
MT. BAKER-SNOQUALMIE NF
 SEATTLE                          WA

WA-122307761  PROJECT:  0605070003
THE DALLES CG, DISINFECT WATER SYSTEM
ACCT: 25  SWA  FUND  SDWA
MT. BAKER-SNOQUALMIE NF
SEATTLE                          WA

WA-122307761  PROJECT:  0605050003
TIMKHAM CG-HANDPUMP DISINFECTION
ACCT: 35 OTHER FUNDS SDWA
MT. BAKER-SNOqUALMIE NF
SEATTLE                          WA
       10.0   PSDF    90/12  90/12 MEDIUM  DRINKING  ADEQUATE  ADEQUATE   ADEQUATE
                                         WATER     DESIGN    TIMING    ESTIMATE
        7.0   PSDF    90/12  90/12 MEDIUM  DRINKING  ADEQUATE  ADEQUATE   ADEQUATE
                                         WATER     DESIGN    TIMING    ESTIMATE
       10.0   PSDF   90/12  90/12 MEDIUM  DRINKING  ADEQUATE  ADEQUATE   ADEQUATE
                                         WATER     DESIGN    TIMING    ESTIMATE
       13.0   PSDF    90/12  90/12 MEDIUM  DRINKING  ADEQUATE  ADEQUATE   ADEQUATE
                                         WATER     DESIGN    TIMING    ESTIMATE
       10.0   PSDF   90/12  90/12 MEDIUM  DRINKING  ADEQUATE  ADEQUATE   ADEQUATE
                                         WATER     DESIGN    TIMING    ESTIMATE
        7.0   PSDF   90/12  90/12 MEDIUM  DRINKING  ADEQUATE  ADEQUATE   ADEQUATE
                                         WATER     DESIGN    TIMING    ESTIMATE

-------
                                 FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                         DEPARTMENT OF AGRICULTURE               FOREST SERVICE
                PROJECT IDENTIFICATION
                     REQ    EST   PROJECT
  BUDGET     COMPL   COMPL  COMPL ASSESS- MEDIA
(THOUSANDS)  STATUS  DATE   DATE  MENT    TYPE
                                                                                                                      USDA-126
  ADEQUACY OF PROJECT
ENGIN-
EERING    TIME      COST
WA-122307761 PROJECT: 0605020007
GOLD BASIN CG,DISINFECTION
ACCT: 35 OTHER FUNDS SDWA
MT. BAKER-SNOQUALMIE NF
SEATTLE                          HA

WA-122307761 PROJECT: 0605020008
GOLD BASIN CG,DISINFECT HANDPUMP
ACCT: 35 OTHER FUNDS SDWA
MT. BAKER-SNOQUALMIE NF
SEATTLE                          WA

WA-122307761 PROJECT: 0605020005
NORTH FORK GUARD STATION - DISCONNECT SYSTEM
ACCT: 25 SWA FUND SDWA
MT. BAKER-SNOQUALMIE NF
SEATTLE                          WA

WA-122307761 PROJECT: 0605020003
MONTE CRISTO CAMPGROUND-TOILET REPLACEMENT
ACCT: 23 SWA FUND CWA-PS
MT. BAKER-SNOQUALMIE NF
SEATTLE                          WA

WA-122307761 PROJECT: 0605050001
NORTH BEND RS, MUNICIPAL CONNECTION
ACCT: 23 SWA FUND CWA-PS
MT. BAKER-SNOQUALMIE NF
SEATTLE                          WA

WI-122307765 PROJECT: 0902050213
DRUMMOND LANDFILL
ACCT: 12 DEPT FUND RCRA
CHEQUAMEGON N.F.
PARK FALLS                       WI
       13.0  PSDF   90/12  90/12 MEDIUM  DRINKING  ADEQUATE  ADEQUATE   ADEQUATE
                                          WATER     DESIGN    TIMING    ESTIMATE
        7.0  PSDF   90/12  90/12 MEDIUM  DRINKING  ADEQUATE  ADEQUATE   ADEQUATE
                                          WATER     DESIGN    TIMING    ESTIMATE
        2.0  ESDL   90/12  90/09 MEDIUM  DRINKING  ADEQUATE   ADEQUATE    ADEQUATE
                                          WATER      DESIGN    TIMING    ESTIMATE
      300.0  ESDP   87/12  90/12  MEDIUM   WATER     ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
      196.0  ESDP   87/12   90/12   HIGH
      200.0  ESDP   91/12   90/09   HIGH
                                          WATER    ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
                                          SOLID    ADEQUATE  ADEQUATE   ADEQUATE
                                          WASTE     DESIGN    TIMING    ESTIMATE

-------
                                  FEDERAL  AGENCY  POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                          DEPARTMENT  OF AGRICULTURE               FOREST SERVICE
                 PROJECT IDENTIFICATION
                     REQ     EST    PROJECT
  BUDGET     COMPL   COMPL   COMPL  ASSESS- MEDIA
(THOUSANDS)   STATUS  DATE    DATE   MENT    TYPE
                                                                     USDA-127
  ADEQUACY OF PROJECT
ENGIN-
EERING    TIME      COST
 WI-122307765 PROJECT:  0902040212
 CLAM LAKE SLF
 ACCT:  12  DEPT FUND  RCRA
 CHEQUAMEGON  N.F.
 PARK FALLS                      WI

 WI-122307765 PROJECT:  0902040314
 WASTE-WATER  PLANT
 ACCT:  23  SWA FUND CWA-PS
 CHEQUAMEGON  N.F.
 PARK FALLS                       WI

 WI-122307772  PROJECT:  0906040505
 WELLS
 ACCT:  25  SWA  FUND SDWA
 NICOLET N.F.
 RHINELANDER                      WI

 WI-122307809  PROJECT: 3200000002
 CONSTRUCTION  OF HAZARD'S MAT'LS STORAGE FACILIT
 ACCT:  12 DEPT FUND RCRA
 FOREST PRODUCTS LABORATORY
 MADISON                          WI

WI-122314803  PROJECT: 2313030004
 ASBESTOS SURVEY
 ACCT:  27 SWA  FUND TSCA
 F.S.L. RHINELANDER
RHINELANDER                      WI

WI-122314803  PROJECT: 2313030009
ASBESTOS ABATEMENT/REMOVAL
ACCT:  27 SWA  FUND TSCA
F.S.L. RHINELANDER
RHINELANDER                      WI
                                                      200.0  ESDP   86/10  90/09  HIGH
       20.0   ESRO    87/12   90/09  HIGH
                                         SOLID    ADEQUATE  ADEQUATE   ADEQUATE
                                         WASTE     DESIGN    TIMING    ESTIMATE
                                         WATER    ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
        7.0   ESDP    91/09   90/09  HIGH   DRINKING    NOT       NOT        NOT
                                         WATER     AVAIL     AVAIL      AVAIL
       80.0   ESDP    00/01   91/06  HIGH    WATER      NOT       NOT        NOT
                                                   AVAIL     AVAIL      AVAIL
       4.0   PSDF   00/01  90/09 MEDIUM   TOXIC      NOT       NOT        NOT
                                       SUBSTANCE   AVAIL     AVAIL      AVAIL
       20.0   PSDF   00/01  90/10 MEDIUM   TOXIC      NOT       NOT        NOT
                                       SUBSTANCE   AVAIL     AVAIL      AVAIL

-------
                                 FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                         DEPARTMENT OF AGRICULTURE               FOREST SERVICE
                PROJECT IDENTIFICATION
                     REQ    EST   PROJECT
  BUDGET     COMPL   COMPL  COMPL ASSESS- MEDIA
(THOUSANDS)  STATUS  DATE   DATE  MENT    TYPE
                                                                                                                      USDA-126
  ADEQUACY OF PROJECT
ENGIN-
EERING    TIME      COST
WA-122307761 PROJECT: 0605020007
GOLD BASIN CG,DISINFECTION
ACCT: 35 OTHER FUNDS SDWA
MT. BAKER-SNOQUALMIE NF
SEATTLE                          HA

WA-122307761 PROJECT: 0605020008
GOLD BASIN CG,DISINFECT HANDPUMP
ACCT: 35 OTHER FUNDS SDWA
MT. BAKER-SNOQUALMIE NF
SEATTLE                          WA

WA-122307761 PROJECT: 0605020005
NORTH FORK GUARD STATION - DISCONNECT SYSTEM
ACCT: 25 SWA FUND SDWA
MT. BAKER-SNOQUALMIE NF
SEATTLE                          WA

WA-122307761 PROJECT: 0605020003
MONTE CRISTO CAMPGROUND-TOILET REPLACEMENT
ACCT: 23 SWA FUND CWA-PS
MT. BAKER-SNOQUALMIE NF
SEATTLE                          WA

WA-122307761 PROJECT: 0605050001
NORTH BEND RS, MUNICIPAL CONNECTION
ACCT: 23 SWA FUND CWA-PS
MT. BAKER-SNOQUALMIE NF
SEATTLE                          WA

WI-122307765 PROJECT: 0902050213
DRUMMOND LANDFILL
ACCT: 12 DEPT FUND RCRA
CHEQUAMEGON N.F.
PARK FALLS                       WI
       13.0  PSDF   90/12  90/12 MEDIUM  DRINKING  ADEQUATE  ADEQUATE   ADEQUATE
                                          MATER     DESIGN    TIMING    ESTIMATE
        7.0  PSDF   90/12  90/12 MEDIUM  DRINKING  ADEQUATE  ADEQUATE   ADEQUATE
                                          WATER      DESIGN    TIMING    ESTIMATE
        2.0  ESDL   90/12  90/09 MEDIUM  DRINKING  ADEQUATE   ADEQUATE    ADEQUATE
                                          WATER     DESIGN     TIMING     ESTIMATE
      300.0  ESDP   87/12  90/12  MEDIUM   WATER
      196.0  ESDP   87/12   90/12   HIGH    WATER
                                                  ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
                                                  ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
      200.0  ESDP   91/12   90/09   HIGH     SOLID    ADEQUATE  ADEQUATE   ADEQUATE
                                          WASTE     DESIGN    TIMING    ESTIMATE

-------
                                 FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR  1991

                         DEPARTMENT OF AGRICULTURE               FOREST SERVICE
                 PROJECT IDENTIFICATION
                    REQ    EST   PROJECT
  BUDGET     COMPL   COMPL  COMPL ASSESS- MEDIA
(THOUSANDS)   STATUS  DATE   DATE  MENT    TYPE
                                                                                                                     USDA-127
  ADEQUACY OF PROJECT
ENGIN-
EERING    TIME      COST
WI-122307765  PROJECT:  0902040212
CLAM  LAKE  SLF
ACCT:  12 DEPT  FUND RCRA
CHEQUAMEGON N.F.
PARK  FALLS                      HI

WI-122307765  PROJECT:  0902040314
WASTE-WATER PLANT
ACCT:  23 SWA  FUND CWA-PS
CHEQUAMEGON N.F.
PARK  FALLS                      WI

WI-122307772 PROJECT:  0906040505
WELLS
ACCT:  25 SWA FUND SDWA
NICOLET N.F.
RHINELANDER                      WI

WI-122307809 PROJECT: 3200000002
CONSTRUCTION OF HAZARD'S MAT'LS STORAGE FACILIT
ACCT:  12 DEPT FUND RCRA
FOREST PRODUCTS LABORATORY
MADISON                          WI

WI-122314803 PROJECT: 2313030004
ASBESTOS SURVEY
ACCT: 27 SWA FUND TSCA
F.S.L. RHINELANDER
RHINELANDER                      WI

WI-122314803 PROJECT: 2313030009
ASBESTOS ABATEMENT/REMOVAL
ACCT: 27 SWA FUND TSCA
F.S.L. RHINELANDER
RHINELANDER                      WI
      200.0   ESDP    86/10   90/09  HIGH
       20.0   ESRO   87/12  90/09  HIGH
                                         SOLID    ADEQUATE  ADEQUATE   ADEQUATE
                                         WASTE     DESIGN    TIMING    ESTIMATE
                                         WATER    ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
        7.0   ESDP    91/09  90/09  HIGH   DRINKING    NOT       NOT        NOT
                                         WATER     AVAIL     AVAIL      AVAIL
      80.0   ESDP   00/01  91/06  HIGH    WATER      NOT       NOT        NOT
                                                   AVAIL     AVAIL      AVAIL
       4.0   PSDF   00/01  90/09 MEDIUM   TOXIC      NOT       NOT        NOT
                                       SUBSTANCE   AVAIL     AVAIL      AVAIL
       20.0   PSDF   00/01  90/10 MEDIUM   TOXIC      NOT       NOT        NOT
                                       SUBSTANCE   AVAIL     AVAIL      AVAIL

-------
                                 FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                         DEPARTMENT OF AGRICULTURE               FOREST SERVICE
                PROJECT IDENTIFICATION
                     REQ    EST   PROJECT
  BUDGET     COMPL   COMPL  COMPL ASSESS- MEDIA
(THOUSANDS)  STATUS  DATE   DATE  MENT    TYPE
                                                                                                                      USDA-128
  ADEQUACY OF PROJECT
ENGIN-
EERING    TIME      COST
WI-122378090 PROJECT: 3200000003
INVESTIGATE CHEMICAL SUMP PIT
ACCT: 12 DEPT FUND RCRA
FOREST PRODUCTS LABORATORY
MADISON                          MI

WV-122307680 PROJECT: 0921060515
BLUE MEADOW CAMPGROUND - HEAVY METALS
ACCT: 25 SWA FUND SDWA
MONONGAHELA N.F.Y
ELKINS                           WV

WV-122307680 PROJECT: 0921000507
17 WELL REPAIR - TURBIDITY FILTERS
ACCT: 25 SWA FUND SDWA
MONONGAHELA N.F.Y
ELKINS                           WV

WV-122307680 PROJECT: 0921040516
TEA CREEK CAMPGROUND TREAT WATER SUPPLY
ACCT: 25 SWA FUND SDWA
MONONGAHELA N.F.Y
ELKINS                           WV

WV-122307680 PROJECT: 0921030517
BARTOW ADMIN SITE - SEAL WELL
ACCT: 25 SWA FUND SDWA
MONONGAHELA N.F.Y
ELKINS                           WV

WV-122307680 PROJECT: 0921050513
BIG BEND IODINATOR - REPLACE
ACCT: 25 SWA FUND SDWA
MONONGAHELA N.F.Y
ELKINS                           WV
       10.0  ESDF   95/12  91/06 MEDIUM   WATER    ADEQUATE  ADEQUATE   ADEQUATE
                                                    DESIGN    TIMING    ESTIMATE
        5.0  ESDP   86/12  90/09  HIGH   DRINKING  ADEQUATE  ADEQUATE    ADEQUATE
                                          WATER     DESIGN    TIMING    ESTIMATE
        5.0  ESDP   86/12  90/09  HIGH   DRINKING    NOT       NOT        NOT
                                          WATER      AVAIL     AVAIL      AVAIL
        5.0  ESDP   92/09  91/09  HIGH    DRINKING  ADEQUATE  ADEQUATE   ADEQUATE
                                          WATER     DESIGN    TIMING    ESTIMATE
        2.5  ESDP   83/12   90/12   HIGH    DRINKING  ADEQUATE  ADEQUATE   ADEQUATE
                                         WATER     DESIGN    TIMING    ESTIMATE
        8.0  ESDP   86/12   90/12   HIGH   DRINKING  ADEQUATE  ADEQUATE   ADEQUATE
                                         WATER     DESIGN    TIMING    ESTIMATE

-------
                                  FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR  1991

                          DEPARTMENT OF AGRICULTURE               FOREST SERVICE
                 PROJECT IDENTIFICATION
                                    REQ    EST   PROJECT
                 BUDGET     COMPL   COMPL  COMPL ASSESS- MEDIA
               (THOUSANDS)  STATUS  DATE   DATE   MENT     TYPE
                                                                                    USDA-129
   ADEQUACY OF PROJECT
 ENGIN-
 EERING    TIME      COST
 WV-122307680 PROJECT:  0921050514
 SPRUCE KNOB 855
 ACCT:  25 SWA FUND  SDWA
 MONONGAHELA N.F.Y
 ELKINS
                       5.0  ESDP   86/12  90/09  HIGH    DRINKING   ADEQUATE  ADEQUATE   ADEQUATE
                                                         WATER     DESIGN    TIMING    ESTIMATE
                                 WV
 WV-122307680  PROJECT:  0921040502
 MARLINGTON  ADMIN SITE  - UPGRADE WATER
 ACCT:  25  SWA  FUND SDWA
 MONONGAHELA N.F.Y
 ELKINS                          WV
WV-122307680 PROJECT: 0921040236
ILLEGAL DUMPS
ACCT: 12 DEPT FUND RCRA
MONONGAHELA N.F.Y
ELKINS
WV-122307680 PROJECT: 0921050235
ILLEGAL DUMPS
ACCT: 12 DEPT FUND RCRA
MONONGAHELA N.F.Y
ELKINS

WV-122307680 PROJECT: 0921010239
ILLEGAL DUMPS
ACCT: 12 DEPT FUND RCRA
MONONGAHELA N.F.Y
ELKINS

WV-122307680 PROJECT: 0921020238
ILLEGAL DUMPS
ACCT: 12 DEPT FUND RCRA
MONONGAHELA N.F.Y
ELKINS
                                 WV
WV
WV
WV
                      22.5  ESRO   91/09  90/09 MEDIUM  DRINKING    NOT       NOT
                                                         WATER      AVAIL     AVAIL
                      36.7  ESDP   86/10  90/09  HIGH     SOLID      NOT       NOT
                                                         WASTE      AVAIL     AVAIL
                      36.7  ESDP   86/10  90/09  HIGH     SOLID      NOT       NOT
                                                         WASTE      AVAIL     AVAIL
                      36.7  ESDP   86/10  90/09  HIGH
                      36.7  ESDP   86/10  90/09   HIGH
                                                         SOLID
                                                         WASTE
                                                         SOLID
                                                         WASTE
 NOT
AVAIL
 NOT
AVAIL
 NOT
AVAIL
 NOT
AVAIL
                      NOT
                     AVAIL
                      NOT
                     AVAIL
                      NOT
                     AVAIL
 NOT
AVAIL
 NOT
AVAIL

-------
                                 FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                         DEPARTMENT OF AGRICULTURE               FOREST SERVICE
                PROJECT IDENTIFICATION
                     REQ    EST   PROJECT
  BUDGET     COMPL   COMPL  COMPL ASSESS- MEDIA
(THOUSANDS)   STATUS  DATE   DATE  MENT    TYPE
                                                                                                                      USDA-130
   ADEQUACY OF PROJECT
 ENGIN-
 EERING    TIME      COST
WV-122307680 PROJECT: 0921030237
ILLEGAL DUMPS
ACCT: 12 DEPT FUND RCRA
MONONGAHELA N.F.Y
ELKINS                           WV

WV-122307680 PROJECT: 0921060234
ILLEGAL DUMPS
ACCT: 12 DEPT FUND RCRA
MONONGAHELA N.F.Y
ELKINS                           WV

WV-122307680 PROJECT: 0921050304
POTOMAC SEWAGE TREATMENT SYSTEM
ACCT: 23 SWA FUND CWA-PS
MONONGAHELA N.F.Y
ELKINS                           WV

WV-122307680 PROJECT: 0921030303
GREENBRIAR SEWAGE TREATMENT SYSTEM
ACCT: 23 SWA FUND CWA-PS
MONONGAHELA N.F.Y
ELKINS                           WV

WV-122307680 PROJECT: 0921030311
GREENBRIAR INFILTRATION
ACCT: 23 SWA FUND CWA-PS
MONONGAHELA N.F.Y
ELKINS                           WV

WV-122307680 PROJECT: 0921060300
LAKE SHERWOOD RECARE
ACCT: 23 SWA FUND CWA-PS
MONONGAHELA N.F.Y
ELKINS                           WV
       36.7  ESDP   86/10  90/09  HIGH     SOLID       NOT       NOT        NOT
                                          WASTE      AVAIL     AVAIL      AVAIL
       36.7  ESDP   86/10  90/09  HIGH     SOLID       NOT       NOT         NOT
                                          WASTE      AVAIL      AVAIL       AVAIL
       10.0  INOV   91/09  90/12   HIGH    WATER    ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
       10.0  ESDP   87/12   90/09  HIGH    WATER    ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
       25.0  ESDP   87/12   90/12   HIGH    WATER
       60.0  ESDP   91/09   90/09   HIGH    WATER
                                                  ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
 NOT
AVAIL
                                                              NOT
                                                             AVAIL
 NOT
AVAIL

-------
                                  FEDERAL  AGENCY  POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                          DEPARTMENT  OF  AGRICULTURE               FOREST SERVICE
                 PROJECT IDENTIFICATION
                     REQ    EST    PROJECT
  BUDGET     COMPL   COMPL   COMPL  ASSESS- MEDIA
(THOUSANDS)   STATUS  DATE    DATE   MENT    TYPE
                                                                     USDA-131
  ADEQUACY OF PROJECT
ENGIN-
EERING    TIME      COST
 WV-122307685 PROJECT:  08080-40009
 TROUT POND RA REPL  LIFT  STA  &  3200' OF PIPE
 ACCT: 23 SWA FUND CWA-PS
 GEORGE WASHINGTON
 HARRISONBURG                    WV

 WV-122314806 PROJECT:  2411000014
 NEFES WV FOR SCI LAB ASBESTOS  REMOVAL
 ACCT:  27 SWA FUND TSCA
 NE  FOREST EXP STATION
 MORGANTOWN                      WV

 WV-122314806  PROJECT: 2411000009
 NEFES  WV-LP,  UST REMOVAL - 1
 ACCT:  12  DEPT FUND RCRA
 NE  FOREST EXP STATION
 MORGANTOWN                      WV

 WV-122314806  PROJECT: 2411000010
 NEFFES WV-LP,  UST, REMOVAL - 2
 ACCT:  12  DEPT FUND RCRA
 NE  FOREST  EXP STATION
 MORGANTOWN                       WV

 WY-122307523  PROJECT: 0206000001
 LITTLE SANDSTONE CG DRILL WELL & CONSTR DIST
 ACCT: 25 SWA  FUND SDWA
MEDICINE BOW  NF
 LARAMIE                          WY

WY-122307591  PROJECT: 0403035002
COTTONWOOD LAKE CAMPGROUND WTR SYS REPLC
ACCT: 25 SWA  FUND SDWA
B3IDGER-TETON NATIONAL FOREST
JACKSON                          WY
      140.0  ESRO   88/09   91/03  MEDIUM   WATER
        5.0   PSDF    91/09   91/01  MEDIUM    AIR
                                                  ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
                                                  ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
        5.0   ESRO    91/09   91/01 MEDIUM   SOLID    ADEQUATE  ADEQUATE   ADEQUATE
                                         WASTE     DESIGN    TIMING    ESTIMATE
        5.0   ESRO    91/09   91/01 MEDIUM   SOLID    ADEQUATE  ADEQUATE   ADEQUATE
                                         WASTE     DESIGN    TIMING    ESTIMATE
       15.0   ESDP
                          90/10  HIGH   DRINKING    NOT
                                         WATER     AVAIL
          NOT
         AVAIL
       32.0  ESDP   86/10  91/02  HIGH   DRINKING    NOT       NOT
                                         WATER     AVAIL     AVAIL
 NOT
AVAIL
                     NOT
                    AVAIL

-------
                                 FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                         DEPARTMENT OF AGRICULTURE               FOREST SERVICE
                PROJECT IDENTIFICATION
                     REQ    EST   PROJECT
  BUDGET     COMPL   COMPL  COMPL ASSESS- HEDIA
(THOUSANDS)  STATUS  DATE   DATE  MENT    TYPE
                                                                      USDA-132
  ADEQUACY OF PROJECT
ENGIN-
EERING    TIME      COST
WY-122307591 PROJECT: 0403045018
COTTONWOOD ADMINISTRATION SITE DIST SYSTEM
ACCT: 25 SWA FUND SDMA
BRIDGER-TETON NATIONAL FOREST
JACKSON                          MY

WY-122307591 PROJECT: 0403065008
HAWKS REST PATROL CABIN WTR SYS REPUCMNT
ACCT: 25 SWA FUND SDWA
BRIDGER-TETON NATIONAL FOREST
JACKSON                          MY

WY-122307591 PROJECT: 0403075007
FISH CREEK ADMINISTRATION SITE WTR SYS UPGRD
ACCT: 25 SWA FUND SDWA
BRIDGER-TETON NATIONAL FOREST
JACKSON                          WY

WY-122307591 PROJECT: 0403023004
HOBACK GUARD STATION
ACCT: 23 SWA FUND CWA-PS
BRIDGER-TETON NATIONAL FOREST
JACKSON                          WY

WY-122307595 PROJECT: 0403075003
BIG SANDY CAMPGROUND WATER SYS REDEVELOP
ACCT: 25 SWA FUND SDWA
BRIDGER-TETON NATIONAL FOREST
JACKSON                          WY

WY-122307595 PROJECT: 0403075024
BOULDER LAKE CAMPGROUND WATERSYSTEM REPLACEMENT
ACCT: 25 SWA FUND SDWA
BRIDGER-TETON NATIONAL FOREST
JACKSON                          WY
       97.0  ESDP   86/10  91/02  HIGH   DRINKING    NOT       NOT        NOT
                                          WATER     AVAIL     AVAIL      AVAIL
       47.0  ESDP   86/10  91/02  HIGH   DRINKING    NOT       NOT        NOT
                                          WATER     AVAIL     AVAIL      AVAIL
       37.0  ESDP   86/10  91/02  HIGH   DRINKING    NOT       NOT        NOT
                                          WATER     AVAIL     AVAIL      AVAIL
       25.0  OTHR   86/10  91/01  MEDIUM   WATER      NOT      NOT        NOT
                                                    AVAIL     AVAIL      AVAIL
       25.0  ESDP   86/10  91/01   HIGH    DRINKING    NOT       NOT        NOT
                                          WATER     AVAIL     AVAIL      AVAIL
       40.0  ESDP   86/10   91/01   HIGH   DRINKING    NOT       NOT        NOT
                                         WATER     AVAIL     AVAIL      AVAIL

-------
                                  FEDERAL AGENCY  POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                          DEPARTMENT  OF  AGRICULTURE               FOREST SERVICE
                 PROJECT IDENTIFICATION
                     RE<3     EST    PROJECT
  BUDGET     COMPL   COMPL   COMPL  ASSESS- MEDIA
(THOUSANDS)   STATUS   DATE    DATE   MENT    TYPE
                                                                     USDA-133
  ADEQUACY OF PROJECT
ENGIN-
EERING    TIME      COST
 WY-122307595 PROJECT:  0403035004
 LYNX CREEK CAMPGROUND  SYSTEM  REPLACEMENT
 ACCT:  25 SMA FUND  SDWA
 BRIDGER-TETON NATIONAL FOREST
 JACKSON                         WY

 WY-122307595 PROJECT:  0403035005
 MOOSE  FLAT CAMPGROUND  SYSTEM  REPLACEMENT
 ACCT:  25 SMA FUND  SDWA
 BRIDGER-TETON NATIONAL FOREST
 JACKSON                         WY

 WY-122307595 PROJECT:  0403013005
 LABARGE  GUARD  STATION
 ACCT:  23 SWA FUND  CWA-PS
 BRIDGER-TETON  NATIONAL FOREST
 JACKSON                          WY

 WY-122307611  PROJECT:  0415045002
 ALPINE CAMPGROUND
 ACCT:  25 SWA  FUND  SDWA
 TARGHEE  NATIONAL FOREST
 ST. ANTHONY                      WY

 WY-122334349  PROJECT:  0214000005
 NEWTON SPRINGS REST-REPLACE PIPE LINE
 ACCT:  25 SWA  FUND  SDWA
 SHOSHONE NF
CODY                             WY

WY-122334349 PROJECT:  0214000003
DEAD INDIAN  CG NEW WATER SYSTEM
ACCT: 25 SWA FUND SDWA
SHOSHONE NF
CODY                             WY
       24.0   ESDP   86/10   91/01  HIGH   DRINKING    NOT       NOT        NOT
                                         WATER     AVAIL     AVAIL      AVAIL
       25.0   ESDP    86/10   91/01  HIGH   DRINKING    NOT       NOT        NOT
                                         WATER     AVAIL     AVAIL      AVAIL
       28.0   OTHR   86/10  91/01 MEDIUM   WATER      NOT       NOT        NOT
                                                   AVAIL     AVAIL      AVAIL
       75.0   ESDP   86/10  91/12  HIGH   DRINKING    NOT       NOT        NOT
                                         WATER     AVAIL     AVAIL      AVAIL
       12.0   ESDP   86/12  91/03  HIGH   DRINKING    NOT       NOT        NOT
                                         WATER     AVAIL     AVAIL      AVAIL
       2.0  ESDP   86/12  90/09  HIGH   DRINKING    NOT       NOT        NOT
                                         WATER     AVAIL     AVAIL      AVAIL

-------
                                 FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                         DEPARTMENT OF AGRICULTURE               FOREST SERVICE
                PROJECT IDENTIFICATION
                     REQ    EST   PROJECT
  BUDGET     COMPL   COMPL  COMPL ASSESS- MEDIA
(THOUSANDS)  STATUS  DATE   DATE  MENT    TYPE
                                                                                                                      USDA-134
            ADEQUACY OF PROJECT
          ENGIN-
          EERING    TIME      COST
HY-122334349 PROJECT: 0214000004
MOOD RIVER GS DRILL NEW HELL
ACCT: 25 SWA FUND SDMA
SHOSHONE NF
CODY                             WY

WY-122334349 PROJECT: 0214000002
WAYNE HOLE STABILIZATION
ACCT: 24 SWA FUND CMA-NPS
SHOSHONE NF
CODY                             MY
       12.0  ESDP   86/12  91/03  HIGH   DRINKING    NOT       NOT
                                          HATER     AVAIL     AVAIL
       24.0  OTHR   95/06  91/04 MEDIUM   WATER
                                                     NOT       NOT
                                                    AVAIL     AVAIL
                               NOT
                              AVAIL
                               NOT
                              AVAIL
      TOTAL, FOREST SERVICE
              47,710.1
740

-------
                                  FEDERAL AGENCY  POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                          DEPARTMENT OF AGRICULTURE               ANIMAL & PLANT HEALTH INSP SER
                 PROJECT  IDENTIFICATION
                     RES    EST   PROJECT
  BUDGET     COMPL   COMPL  COMPL  ASSESS-  MEDIA
(THOUSANDS)   STATUS  DATE    DATE   MENT     TYPE
                                                                     USDA-135
    ADEQUACY OF PROJECT
  ENGIN-
  EERING    TIME      COST
 DC-123400003  PROJECT: UST03
 UST  RETROFIT/UPGRADE
 ACCT:  OTHER
 APHIS  AIR BASES
DC-123400003 PROJECT: HAZD04
HAZARDOUS WASTE
ACCT: OTHER
APHIS AIR BASES
DC-123400003 PROJECT: HAZD05
HAZARDOUS WASTE
ACCT: OTHER
APHIS AIR BASES
      152.5  ESDF   98/06   95/06   LOW
                                 DC
                                 DC
                                 DC
      100.0   ESDL
       75.0   OTHR
                           90/09   LOW
                                          SOLID
                                          WASTE
                                          SOLID
                                          WASTE
                           90/09   LOW      SOLID
                                          WASTE
  NOT
 AVAIL
 NOT
AVAIL
 NOT
AVAIL
ADEQUATE  ADEQUATE   ADEQUATE
 DESIGN    TIMING    ESTIMATE
ADEQUATE  ADEQUATE   ADEQUATE
 DESIGN    TIMING    ESTIMATE
      TOTAL, ANIMAL & PLANT HEALTH INSP SER
                                                                 327.5

-------
                                 FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                         DEPARTMENT OF AGRICULTURE               SOIL CONSERVATION SERVICE
                PROJECT IDENTIFICATION
                     REQ    EST   PROJECT
  BUDGET     COMPL   COMPL  COMPL ASSESS- MEDIA
(THOUSANDS)  STATUS  DATE   DATE  MENT    TYPE
                                                                      USDA-136
                            ADEQUACY OF PROJECT
                          ENGIN-
                          EERING    TIME      COST
DC-123500003 PROJECT: WHAT-02
REPLACE IMPROPER PESTICIDE STORAGE FACILITY
ACCT: OTHER
PLANT MATERIALS CENTERS
                                 DC

DC-123500003 PROJECT: WHAT-03
REPLACE UNDERGROUND GASOLINE TANKS
ACCT: OTHER
PLANT MATERIALS CENTERS
                                 DC

DC-123500003 PROJECT: MHAT-01
PESTICIDE EDUCTOR SYSTEM
ACCT: OTHER
PLANT MATERIALS CENTERS
                                 DC
      122.0  PSDF
       12.0  ESDP
       30.0   PSDF
90/09 MEDIUM PESTICIDES   NOT       NOT
                         AVAIL     AVAIL
90/09  HIGH
                                          SOLID
                                          WASTE
                           90/09 MEDIUM   HATER
                          NOT
                         AVAIL
                                                     NOT
                                                    AVAIL
 NOT
AVAIL
                                    NOT
                                   AVAIL
                                                                          NOT
                                                                         AVAIL
 NOT
AVAIL
            NOT
           AVAIL
      TOTAL, SOIL CONSERVATION SERVICE
                 164.0

-------
                                  FEDERAL  ASENCY  POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                          DEPARTMENT  OF  AGRICULTURE               FOOD SAFETY S, INSPEC SERVICE
                 PROJECT IDENTIFICATION
                     REQ     EST    PROJECT
  BUDGET     COMPL   CCMPL   COMPL  ASSESS- MEDIA
(THOUSANDS)   STATUS   DATE    DATE   MENT    TYPE
                                                                     USDA-137
    ADEQUACY OF PROJECT
  ENGIN-
  EERING    TIME      COST
 CA-123700760 PROJECT:  WL2
 HAZARDOUS WASTE AUDITING PROGRAM
 ACCT:  OTHER
 WESTERN LABORATORY
 ALAMEDA                         CA

 KY-123700005 PROJECT:  CL3
 HAZARDOUS WASTE AUDITING PROGRAM
 ACCT:  OTHER
 KENTUCKY  DEPT OF AGRICULTURE
 FRANKFORT                       KY

 MO-123700600  PROJECT:  MWL2
 HAZARDOUS WASTE AUDITING PROGRAM
 ACCT:  OTHER
 MID-WESTERN  LABORATORY
 ST. LOUIS                       MO

 NC-123700005  PROJECT:  CL1
 HAZARDOUS WASTE AUDITING PROGRAM
 ACCT:  OTHER
 WEBB FOODLAB, INC.
 RALEIGH                          NC

 TX-123700005  PROJECT: CL2
HAZARDOUS  WASTE AUDITING PROGRAM
ACCT: OTHER
NDRC LABORATORIES HOUSTON INC
HOUSTON                          TX

*     TOTAL,  FOOD SAFETY & INSPEC SERVICE
        4.8  OTHR
             OTHR
        4.8   OTHR
        2.4   OTHR
        2.4  OTHR
                           90/09 MEDIUM   SOLID
                                         WASTE
                           90/09 MEDIUM   SOLID
                                         WASTE
                           90/09 MEDIUM   SOLID
                                         WASTE
                           90/09 MEDIUM   SOLID
                                         WASTE
                           90/09 MEDIUM   SOLID
                                         WASTE
ADEQUATE  ADEQUATE   ADEQUATE
 DESIGN    TIMING    ESTIMATE
ADEQUATE  ADEQUATE   ADEQUATE
 DESIGN    TIMING    ESTIMATE
ADEQUATE  ADEQUATE   ADEQUATE
 DESIGN    TIMING    ESTIMATE
ADEQUATE  ADEQUATE   ADEQUATE
 DESIGN    TIMING    ESTIMATE
ADEQUATE  ADEQUATE   ADEQUATE
 DESIGN    TIMING    ESTIMATE
                                                                  16.8
      TOTAL, DEPARTMENT OF AGRICULTURE
                                                              61,776.4
                                                                                           769

-------
DOI

-------
DEPARTMENT OF
   INTERIOR

-------
                                                       DOI-1
THE DEPARTMENT OF THE INTERIOR

The Department of the Interior (DOI) owns 3,959 installations
across the country. DOI also owns about 505 million acres, making
it the largest Federal landowner in the United States.  It also
has trust responsibility for another 50 million acres, primarily
Indian lands. Additionally, the agency owns 38,406 buildings with
a total of 33 million square feet of floor space. The Bureau of
Land Management alone is responsible for 284 million acres of
public lands.

AGENCY POLLUTION ABATEMENT PLAN FOR FY 1991

DOI proposed 8 projects, totalling $23.3 million for their FY
1991 environmental plan.  EPA is currently working with the
Office of Construction Management within DOI to assist them in
conducting environmental audits on a large number of facilities
to identify potential projects for inclusion in the agency A-106
plan. After the identification is completed EPA has agreed to
assist DOI in training agency staff in the A-106 reporting
process.

In the FY 1991 plan, the National Park Service proposed 2
projects, totalling $10 million; the Bureau of Reclamation
proposed 4 projects, totalling $11.5 million; and the Fish and
Wildlife Service proposed 2 projects, totally $1.8 million

EPA evaluated each project in the DOI environmental plan and
categorized them according to the potential impact on the local
environment that would occur as a result of not funding the
projects in FY 1991.  EPA rated 5 projects  (budgeted at $21.5
million) as having a "High" environmental impact.  "Medium"
ratings were assigned to 3 projects  ($1.8 million) and no
projects were rated as having a "Low" impact.

The distribution of projects across compliance classes for DOI
indicates that there are 2 Class I projects, those in the plan
for current compliance reasons, or 25 percent of the total number
of projects in the FY 1991 plan.  The 2 Class II projects, those
in the plan to permit the agency to meet near-term future
compliance deadlines, make up 25 percent of the total; and the  4
Class III projects, those in the plan for other environmental
reasons, make up 50 percent of the total.

The projects proposed by DOI in their FY 1991 plan are
distributed across the various environmental media programs  in
the following pattern:  4 projects  in the water area, costing
$8.6 million; 2 in the RCRA area, costing $8 million; plus one
CERCLA project, costing $6.8 million.  Additionally,  the  agency
proposes a project in the toxics area, costing $10 thousand.

-------
                                                                                   DOI-2
                     TOTAL NUMBER OF POLLUTION ABATEMENT

                      PROJECTS PROPOSED FOR FY 1987 - 91

                             DEPT OF INTERIOR
 w

 6
 uj

 o
 cc
 Q.

 U.
 O

 cc
 UJ
 m
 5
 D
 Z
               FY87
                             FY88
DOI FIG 1
    FY89



RSCAL YEARS
                                                          FY90
FY91

-------
                                                                                        DOI-3
                       TOTAL DOLLARS REQUEST FOR POLLUTION

                       ABATEMENT PROJECTS FOR FY 1987 - 91

                               DEPT OF INTERIOR
     30000
o
o
o
W
tc
O
Q
     20000-
     10000-
               FY87
                              FY88
                                            FY89
                                                          FY90
                                                                         FY91
  DOI FIG 2
FISCAL YEARS

-------
                                                                                            DOI-4
     BUREAU
    FISH & WILDLIFE
     RECLAMATION
 NATL PARK SERVICE
DOI FIG 3
                            TOTAL NUMBER AND DOLLARS PROPOSED FOR
                             POLLUTION ABATEMENT NEEDS FOR FY 1991
                                      DEPT OF INTERIOR
                                                    1793
                                                            11520
                                                            10000

I 	 1
10

100

1000

10000

1
100000

1
1000000

1000
0000
PROJECTS


DOLLARS ($000)

-------
                        TOTAL NUMBER AND DOLLARS PROPOSED FOR
                           CLASS I, II, III PROJECTS FOR FY 1991
                                  DEPT OF INTERIOR
                                                                                             DOI-5
  CLASS I
  CLASS II
  CLASS III
                     —T~
                     1 0
                                        197.5
                                                              10699.4
100
             1000
	1	
 10000
	1	
 100000
                                                   1000000
DOIFIG4
E3  PROJECTS

•  DOLLARS ($000)

-------
                                                                                   DOI-6
   001  - TABLE 1: EPA EVALUATION OF THE ENVIRONMENTAL IMPACT OF PROPOSED
                   POLLUTION ABATEMENT PROJECTS FOR FISCAL YEAR 1991
                   INCLUDING NUMBER AND COST
                         DEPARTMENT OF INTERIOR
COMPLIANCE *
STATUS

CMPA

INOV

ESDF

ESRO

ESRE

OTHR

GRAND TOTAL

HIGH
PROJECTS
COST
($1,000)
1
6,600.0
1
3,200.0
1
4,000.0
0
0.0
0
0.0
z
7,510.0
5
21,510.0
MEDIUM
PROJECTS
COST
($1,000)
0
0.0
0
0.0
1
10.0
1
793.0
1
1,000.0
0
0.0
3
1,803.0
LOW

PROJECTS
COST
($1,000)

0

0

0

0

0

0

0
0
.0
0
.0
0
.0
0
.0
0
.0
0
.0
0
.0
TOTAL
PROJECTS
COST
($1,000)
1
6,600.0
1
3,200.0
2
4,010.0
1
793.0
1
1,000.0
2
7,510.0
8
23,313.0
*  SEE SECTION III FOR  DEFINITIONS OF COMPLIANCE STATUS CATEGORIES

-------
        DOI   -   TABLE  2:
NUMBER AND DOLLAR AMOUNT OF POLLUTION ABATEMENT  PROJECTS  FOR  FEDERAL  INSTALLATIONS
PROPOSED BY MAJOR COMMAND/BUREAU FOR  FISCAL YEAR 1991  BY  CLASS/COMPLIANCE STATUS.*

                DEPARTMENT OF INTERIOR
                                                                                                                          DOI-7
MAJOR COMMAND/
BUREAU

NATL PARK
SERV
BUR OF
RECLAMATION
FISH *
WILDLIFE
TOTAL
CMPA
PROJECTS
COST
($1 ,000)
1
6,800.0


1
6,300.0
CLASS I
INOV ESDP
_
PROJECTS PROJECTS
COST COST
(SI, 000) ($1,000)
1
3,200.0


1
3,200.0
CLASS II
ESDF PSDF
	 	
PROJECTS PROJECTS
COST COST
($1,000) ($1,000)
	 	 	
	
2
4, 010.0
	
2
4, 010.0
ESRO
PROJECTS
COST
( $1,000)


1
793.0
	
1
793.0
CLASS III
ESRE ESDL
PROJECTS PROJECTS
COST COST
($1,000) ($1,000)


1
1,000.0
1
1,000.0
	
OTHR
_
PROJECTS
COST
($1,000)
	
_
2
7,510.0

2
7,510.0
TOTAL
PROJECTS
COST
($1 ,000)
2
10,000.0
4
11,520.0
2
1,793.0
8
23,313.0
* SEE SECTION III FOR DEFINITIONS OF COMPLIANCE STATUS CATEGORIES

-------
                                                                                                       DOI-S
DOI  - TABLE 3: NUMBER AND DOLLAR AMOUNT OF POLLUTION ABATEMENT PROJECTS PROPOSED BY
                MAJOR COMMAND/BUREAU AND ENVIRONMENTAL MEDIA FOR FISCAL YEAR 1991

                                DEPARTMENT OF INTERIOR
MAJOR COMMAND/
BUREAU AIR
PROJECTS
COST
($1,000)
NATL PARK
SERV
BUR OF
RECLAMATION
FISH t
MILD LIFE
TOTAL
DRINKING
MATER NOISE PESTICIDES RADIATION CERCLA
PROJECTS PROJECTS PROJECTS PROJECTS PROJECTS
COST COST COST COST COST
($1,000) ($1,000) ($1,000) ($1,000) ($1,000)
1
6800.0


1
6800.0
RCRA
PROJECTS
COST
($1,000)

2
7950.0

2
7950.0
TSCA
PROJECTS
COST
($1,000)

1
10.0

1
10.0
MATER
PROJECTS
COST
($1,000)
1
3200.0
1
3560.0
2
1793.0
4
8553.0
MULTI TOTAL
PROJECTS PROJECTS
COST COST
($1,000) ($1,000)
2
10000.0
4
11520.0
2
1793.0
8
23313.0

-------
                                 FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR  FISCAL  YEAR  1991

                         DEPARTMENT OF INTERIOR                  NATIONAL PARK SERVICE
                PROJECT IDENTIFICATION
                     REQ     EST    PROJECT
  BUDGET     COMPL   COMPL   COMPL  ASSESS- MEDIA
(THOUSANDS)   STATUS   DATE    DATE   MENT    TYPE
                                                                     DOI-9
                            ADEQUACY  OF  PROJECT
                          ENGIN-
                          EERING   TIME      COST
OH-141732212 PROJECT: GUVA-367
KREJCI DAMP CLEANUP
ACCT: OTHER
CUYAHCGA VALLEY NRA
BRECKSVILLE                      OH

WY-141707093 PROJECT: YELL-430
UPGRADE WASTEWATER TREATMENT SYSTEM - CANYON
ACCT: OTHER
YELLOWSTONE NATIONAL PARK
YELLOWSTONE                      WY
    6,800.0   CMPA
    3,200.0   INOV
90/09  HIGH    CERCLA   ADEQUATE   ADEQUATE    ADEQUATE
                         DESIGN    TIMING     ESTIMATE
                           90/09  HIGH
                                         WATER
                                                    NOT       NOT
                                                   AVAIL     AVAIL
                                               NOT
                                             AVAIL
      TOTAL, NATIONAL PARK SERVICE
                                                              10,000.0

-------
                                 FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR  1991

                         DEPARTMENT OF INTERIOR                  BUREAU OF RECLAMATION
                PROJECT IDENTIFICATION
                     REQ    EST   PROJECT
  BUDGET     COMPL   COMPL  COMPL  ASSESS- MEDIA
(THOUSANDS)   STATUS  DATE    DATE   MENT    TYPE
                                                                                                                     DOI-10
                            ADEQUACY OF  PROJECT
                          ENGIN-
                          EERING     TIME     COST
CA-142306855 PROJECT: 0805
CONTROLLING RESIDUAL CONTAMINATION (SE)
ACCT: OTHER
CVP - KESTERSON RESERVOIR
LOS BANDS                        CA

CO-142313801 PROJECT: 1335
TREAT i REMOVE DISCHARGE OF HEAVY METALS
ACCT: OTHER
LEADVILLE MINE DRAINAGE TUNNEL
LEADVILLE CO                     CO

10-142306820 PROJECT: 0003
CSPO PCB DISPOSAL PROGRAM
ACCT: OTHER
CENTRAL SNAKE PROJECT
BOISE                            ID

UT-142306887 PROJECT: JAB-01
CENTRAL UTAH PROJECT BONNEVILLE UNIT
ACCT: OTHER
JORDANELLE RESERVOIR
HEBER CITY                       UT
    3,950.0  OTHR   91/10  90/09   HIGH
    3,560.0  OTHR   92/09  90/09  HIGH
               SOLID    ADEQUATE  ADEQUATE   ADEQUATE
               WASTE     DESIGN   TIMING    ESTIMATE
               HATER     ADEQUATE  ADEQUATE   ADEQUATE
                         DESIGN    TIMING    ESTIMATE
       10.0  ESDF
    4,000.0  ESDF
90/09 MEDIUM   TOXIC     ADEQUATE  ADEQUATE   ADEQUATE
             SUBSTANCE    DESIGN    TIMING    ESTIMATE
                           90/09  HIGH
               SOLID
               WASTE
ADEQUATE  ADEQUATE   ADEQUATE
 DESIGN    TIMING    ESTIMATE
      TOTAL, BUREAU OF RECLAMATION
              11,520.0

-------
                                 FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                         DEPARTMENT OF INTERIOR                  FISH AND WILDLIFE SERVICE
                PROJECT IDENTIFICATION
                     REQ    EST   PROJECT
  BUDGET     COMPL   COMPL  CCMPL ASSESS-  MEDIA
(THOUSANDS)   STATUS  DATE    DATE   MENT     TYPE
                                                                     DOI-11
  ADEQUACY OF PROJECT
ENGIN-
EERING    TIME      COST
WA-143609181 PROJECT: FWS-1-113
REPLACE VACUUM SYSTEM WITH SETTLING SYSTEM
ACCT: OTHER
QUILCENE NFH
QUILCENE                         WA

WA-143609353 PROJECT: FWS-1-119
ENLARGE POLLUTION ABATEMENT SYSTEM
ACCT: OTHER
LEAVENKORTH NFH
LEAVENWORTH                      WA

*     TOTAL, FISH AND WILDLIFE SERVICE
                                                      793.0  ESRO
    1,000.0   ESRE
                           9Z/09 MEDIUM    WATER
                           9Z/07  MEDIUM   WATER
                                                  ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
                                                  ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
                                                               1,793.0
      TOTAL, DEPARTMENT OF INTERIOR
                                                              23,313.0

-------
DOL

-------
DEPARTMENT OF
    LABOR

-------
                                                            DOL-1
DEPARTMENT OF LABOR

The Department of Labor (DOL) owns 49 installations occupying
99,922 acres of land. It also owns 1,195 buildings encompassing
9,280,000 square feet. The Department's buildings house
administrative and training programs. Many of the Department's
programs are administered jointly with States.

AGENCY POLLUTION ABATEMENT PLAN FOR FY 1991

DOL proposed 176 projects, totalling $11.4 million for their FY
1991 environmental plan. EPA is currently working with the
Department to develop a fully computerized departmental
environmental planning and budgeting process to support their A-
106 activities. After the identification of potential projects
for inclusion in the agency A-106 plan is completed, EPA has
agreed to assist DOL in training agency staff in the A-106
reporting process.

In the FY 1991 plan, DOL proposed 176 projects, primarily
affecting the Department's Job Corps Training Centers. These
projects totaled $11.4 million.

EPA evaluated each project in the DOL environmental plan and
rated them according to the potential environmental impact if the
project were not funded in FY 1991. EPA rated 37 projects as
having a "High" environmental impact (budgeted at $5.1 million).
"Medium" ratings were assigned to 107 projects ($5.2 million),
and 32 projects were rated as having a "Low" impact ($1 million).

The distribution of projects among compliance classes for DOL
indicates 5 Class I projects, or 2.8 percent of the total number
of projects in the FY 1991 plan.  The 23 Class II projects, or 13
percent of the total projects are in the plan to permit the
agency to meet near-term compliance deadlines.  The 148 Class III
projects, those in the plan for other environmental reasons,
make up 84 percent of the total.

The projects proposed by DOL in their FY 1991 plan are
distributed across the various environmental media programs in
the following pattern:  26 air projects costing $953,100; 28 RCRA
projects costing $1.7 million; 3 projects to comply with TSCA,
costing $168,800; 7 water quality projects costing $457,100; and
112 multimedia projects costing $8.1 million.

-------
                                                                                    DOL-2
                       TOTAL NUMBER AND DOLLARS PROPOSED FOR
                        POLLUTION ABATEMENT NEEDS FOR FY 1991
                                  DEPT OF LABOR
                                                            11397.6
      100
                               	1	
                               1000
           	1	
            10000
100000
DOL FIG 1
PROJECTS

DOLLARS ($000)

-------
                                                                                     DOL-3
                      TOTAL NUMBER AND DOLLARS PROPOSED FOR
                      POLLUTION ABATEMENT PROJECTS FOR FY 1991
                                DEPT OF LABOR
     CLASS!
     CLASS II
    CLASS
                                     1 00
           1000
10000
                                      100000
DOL FIG 2
PROJECTS

DOLLARS ($000)

-------
                                                                                   DOL-4
   DDL  - TABLE 1: EPA EVALUATION OF THE ENVIRONMENTAL IMPACT OF PROPOSED
                   POLLUTION ABATEMENT PROJECTS FOR FISCAL YEAR 1991
                   INCLUDING NUMBER AND COST
                         DEPARTMENT OF LABOR
COMPLIANCE *
STATUS

1NOV
ESDP
ESDF
PSDF
ESRO
ESDL
OTHR
GRAND TOTAL
HIGH
PROJECTS
COST
($1,000)
1
8.7
4
188.8
1
5.7
0
0.0
25
3,780.5
0
0.0
6
1,156.7
37
5,140.4
MEDIUM
PROJECTS
COST
(»1,000)
0
0.0
0
0.0
16
671.6
6
77.7
8
273.2
4
128.7
73
4,097.9
107
5,249.1
LOW
PROJECTS
COST
($1,000)
0
0.0
0
0.0
0
0.0
0
0.0
0
0.0
1
5.4
31
1,002.7
32
1,008.1
TOTAL
PROJECTS
COST
($1,000)
1
6.7
4
188.8
17
677.3
6
77.7
33
4,053.7
5
134.1
110
6,257.3
176
11,397.6
*  SEE SECTION III FOR  DEFINITIONS OF COMPLIANCE STATUS CATEGORIES

-------
       DDL   -   TABLE  2:
                          NUMBER  AND  DOLLAR  AMOUNT  OF  POLLUTION ABATEMENT PROJECTS FOR FEDERAL INSTALLATIONS
                          PROPOSED  BY MAJOR  COMMAND/BUREAU  FOR FISCAL YEAR 1991 BY CLASS/COMPLIANCE STATUS.*

                                          DEPARTMENT OF  LABOR
                                                                                                                          DOL-5
MAJOR COMMAND/
BUREAU CMPA
PROJECTS
COST
($1 ,000)
DEPT OF
LABOR
TOTAL
CLASS I
INOV
PROJECTS
COST
(SI, 000)
1
8.7
1
e.7
	
ESDP
PROJECTS
COST
($1,000)
	
4
188.8
	
4
188.8
CLASS
ESDF
PROJECTS
COST
($1,000)
17
677.3
17
677.3
	
II
PSDF
PROJECTS
COST
(51,000)
6
77.7
6
77.7
ESRO
PROJECTS
COST
($1,000)
33
4,053.7
33
4,053.7
CLASS
ESRE
PROJECTS
COST
(51,000)


III
ESDL
PROJECTS
COST
($1 ,000)
5
134.1
5
134.1
OTHR
	
PROJECTS
COST
($1,000)
110
6,257.3
110
6,257.3
	
TOTAL
PROJECTS
COST
($1,000)
176
11,397.6
176
11,397.6
* SEE SECTION III FOR DEFINITIONS OF COMPLIANCE STATUS CATEGORIES

-------
                                                                                                       DOL-6
DOL  - TABLE 3: NUMBER AND DOLLAR AMOUNT OF POLLUTION ABATEMENT PROJECTS PROPOSED BY
                MAJOR COMMAND/BUREAU AND ENVIRONMENTAL MEDIA FOR FISCAL YEAR 1991

                                DEPARTMENT OF LABOR
MAJOR COMMAND/ DRINKING
BUREAU AIR MATER

DEPT OF
LABOR
TOTAL
PROJECTS PROJECTS
COST COST
(*1,000) ($1,000)
26
953.1
26
953.1
NOISE PESTICIDES RADIATION CERCLA RCRA
PROJECTS PROJECTS PROJECTS PROJECTS PROJECTS
COST COST COST COST COST
(*1,000) ($1,000) ($1,000) ($1,000) ($1,000)
28
1712.0
28
1712.0
TSCA
PROJECTS
COST
($1,000)
3
168.8
3
168.8
WATER
PROJECTS
COST
($1,000)
7
457.1
7
457.1
MULTI
PROJECTS
COST
($1,000)
112
6106.6
112
8106.6
TOTAL
PROJECTS
COST
($1,000)
176
11397.6
176
11397.6

-------
                                 FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                         DEPARTMENT OF  LABOR                     DEPARTMENTOF LABOR
                 PROJECT IDENTIFICATION
                     REQ    EST    PROJECT
  BUDGET     COMPL   COMPL  COMPL  ASSESS- MEDIA
(THOUSANDS)   STATUS  DATE    DATE   MENT    TYPE
                                                                                                                     DOL-7
                            ADEQUACY OF  PROJECT
                          ENGIN-
                          EERING     TIME      COST
AL-160000416  PROJECT:  10103
ASBESTOS
ACCT: OTHER
TUSKEGEE
TUSKEGEE                         AL

AR-160000612  PROJECT:  10102
ASBESTOS
ACCT: OTHER
LITTLE ROCK
LITTLE ROCK                      AR

AR-160000612  PROJECT:  120202
SEWER AND STORM DRAINAGE
ACCT: OTHER
LITTLE ROCK
LITTLE ROCK                      AR

AR-160000615  PROJECT:  10104
ASBESTOS
ACCT: OTHER
CASS
OZARK                            AR

AR-160000616  PROJECT:  10102
ASBESTOS
ACCT: OTHER
OUACHITA
ROYAL                            AR

AZ-160000904 PROJECT:  10201
FUEL TANKS - UNDERGROUND
ACCT: OTHER
PHOENIX
PHOENIX                          AZ
                                                      212.0  OTHR
        8.7  INOV
                           90/09   LOW    MULTI
                                        MEDIA
                           90/09  HIGH     AIR
                        ADEQUATE  ADEQUATE    ADEQUATE
                         DESIGN    TIMING     ESTIMATE
        1.4  ESRO    92/06   90/09  HIGH    WATER
       10.4  OTHR
        8.9   OTHR
        6.6   ESDF
                           90/09 MEDIUM    AIR
                           90/09 MEDIUM    AIR
90/09 MEDIUM  MULTI
              MEDIA
                                                   UNDER
                                                   DESIGN
                                  ADEQUATE
                                   TIMING
ADEQUATE
ESTIMATE
                        ADEQUATE   ADEQUATE    ADEQUATE
                         DESIGN    TIMING    ESTIMATE
                                                  ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
                                                  ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
                                                  ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE

-------
                                 FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                         DEPARTMENT OF LABOR                     DEPARTMENTOF LABOR
                PROJECT IDENTIFICATION
                     REQ    EST   PROJECT
  BUDGET     COMPL   COMPL  COMPL ASSESS- MEDIA
(THOUSANDS)  STATUS  DATE   DATE  MENT    TYPE
                                                                     DOL-8
                            ADEQUACY OF PROJECT
                          ENGIN-
                          EERING    TIME      COST
AZ-160000904 PROJECT: 10102
ASBESTOS
ACCT: OTHER
PHOENIX
PHOENIX                          AZ

AZ-160000908 PROJECT: 10103
ASBESTOS
ACCT: OTHER
TUCSON
TUCSON                           AZ

CA-160000901 PROJECT: 90102
ASBESTOS
ACCT: OTHER
LOS ANGELES
LOS ANGELES                      CA

CA-160000902 PROJECT: 10101
ASBESTOS
ACCT: OTHER
SAN JOSE
SAN JOSE                         CA

CA-160000906 PROJECT: 10103
ASBESTOS
ACCT: OTHER
SACRAMENTO
SACRAMENTO                       CA

CA-160000909 PROJECT: 100104
ASBESTOS
ACCT: OTHER
SAN DIEGO
IMPERIAL BEACH                   CA
       12.3  ESRO
        8.2  ESRO
       23.5  ESRO
         .4  ESRO
       12.5  ESRO
       15.6  ESRO
                           90/09 MEDIUM  MULTI      ADEQUATE  ADEQUATE   ADEQUATE
                                         MEDIA       DESIGN    TIMING    ESTIMATE
90/09 MEDIUM  MULTI     ADEQUATE   ADEQUATE    ADEQUATE
              MEDIA      DESIGN    TIMING     ESTIMATE
                           90/09  HIGH   MULTI
                                         MEDIA
90/09 MEDIUM  MULTI
              MEDIA
90/09 MEDIUM  MULTI
              MEDIA
90/09  HIGH   MULTI
              MEDIA
                        ADEQUATE  ADEQUATE   ADEQUATE
                         DESIGN    TIMING    ESTIMATE
ADEQUATE  ADEQUATE   ADEQUATE
 DESIGN    TIMING    ESTIMATE
ADEQUATE  ADEQUATE   ADEQUATE
 DESIGN    TIMING    ESTIMATE
ADEQUATE  ADEQUATE   ADEQUATE
 DESIGN    TIMING    ESTIMATE

-------
                                 FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR  FISCAL  YEAR  1991

                         DEPARTMENT OF LABOR                     DEPARTMENTOF LABOR
                PROJECT IDENTIFICATION
                     REQ     EST    PROJECT
  BUDGET     COMPL    COMPL   COMPL  ASSESS- MEDIA
(THOUSANDS)   STATUS   DATE    DATE   MENT    TYPE
                                                                                                                     DOL-9
              ADEQUACY OF PROJECT
            ENGIN-
            EERING    TIME      COST
CA-160000909 PROJECT: 10101
ASBESTOS
ACCT: OTHER
SAN DIEGO
IMPERIAL BEACH                   CA

CA-160000909 PROJECT: 210102
ASBESTOS
ACCT: OTHER
SAN DIEGO
IMPERIAL BEACH                   CA

CA-160000909 PROJECT: 210103
ASBESTOS
ACCT: OTHER
SAN DIEGO
IMPERIAL BEACH                   CA

CA-160000909 PROJECT: 230102
ASBESTOS
ACCT: OTHER
SAN DIEGO
IMPERIAL BEACH                   CA

CA-160000909 PROJECT: 270103
ASBESTOS
ACCT: OTHER
SAN DIEGO
IMPERIAL BEACH                   CA

CA-160000909 PROJECT: 270104
ASBESTOS
ACCT: OTHER
SAN DIEGO
IMPERIAL BEACH                   CA
                                                       29.6  ESRO
        2.0   ESRO
        2.0   ESRO
      338.0   ESRO
        7.8  ESRO
      520.0   ESRO
                           90/09 MEDIUM  MULTI
                                        MEDIA
                           90/09  HIGH
                           90/09  HIGH
                           90/09   HIGH
                           90/09   HIGH
                           90/09   HIGH
                                        MULTI
                                        MEDIA
MULTI
MEDIA
MULTI
MEDIA
                                        MULTI
                                        MEDIA
                                        MULTI
                                        MEDIA
          ADEQUATE  ADEQUATE    ADEQUATE
           DESIGN    TIMING    ESTIMATE
          ADEQUATE  ADEQUATE   ADEQUATE
           DESIGN    TIMING    ESTIMATE
ADEQUATE  ADEQUATE   ADEQUATE
 DESIGN    TIMING    ESTIMATE
ADEQUATE  ADEQUATE   ADEQUATE
 DESIGN    TIMING    ESTIMATE
          ADEQUATE  ADEQUATE   ADEQUATE
           DESIGN    TIMING    ESTIMATE
          ADEQUATE  ADEQUATE   ADEQUATE
           DESIGN    TIMING    ESTIMATE

-------
                                 FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                         DEPARTMENT OF LABOR                     DEPARTMENTOF LABOR
                PROJECT IDENTIFICATION
                     REQ    EST   PROJECT
  BUDGET     COMPL   COMPL  COMPL ASSESS- MEDIA
(THOUSANDS)  STATUS  DATE   DATE   MENT    TYPE
                                                                     DOL-10
                            ADEQUACY OF PROJECT
                          ENGIN-
                          EERING    TIME      COST
CA-160000909 PROJECT: 260107
ASBESTOS
ACCT: OTHER
SAN DIEGO
IMPERIAL BEACH                   CA

CA-160000909 PROJECT: 290102
ASBESTOS
ACCT: OTHER
SAN DIEGO
IMPERIAL BEACH                   CA

CA-160000909 PROJECT: 300103
ASBESTOS
ACCT: OTHER
SAN DIEGO
IMPERIAL BEACH                   CA

CA-160000909 PROJECT: 30010*
ASBESTOS
ACCT: OTHER
SAN DIEGO
IMPERIAL BEACH                   CA

CA-160000909 PROJECT: 300105
ASBESTOS
ACCT: OTHER
SAN DIEGO
IMPERIAL BEACH                   CA

CA-160000909 PROJECT: 30102
ASBESTOS
ACCT: OTHER
SAN DIEGO
IMPERIAL BEACH                   CA
      520.0  ESRO
      520.0  ESRO
        2.0  ESRO
       10.1  ESRO
       11.4  ESRO
        2.0  ESRO
90/09  HIGH   MULTI     ADEQUATE  ADEQUATE    ADEQUATE
              MEDIA      DESIGN    TIMING    ESTIMATE
90/09  HIGH   MULTI     ADEQUATE   ADEQUATE    ADEQUATE
              MEDIA      DESIGN    TIMING     ESTIMATE
90/09  HIGH   MULTI     ADEQUATE   ADEQUATE   ADEQUATE
              MEDIA      DESIGN    TIMING    ESTIMATE
                           90/09   HIGH   MULTI     ADEQUATE  ADEQUATE   ADEQUATE
                                        MEDIA      DESIGN    TIMING    ESTIMATE
90/09  HIGH   MULTI
              MEDIA
90/09  HIGH   MULTI
              MEDIA
                                                  ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
                                                  ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE

-------
                                 FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                         DEPARTMENT OF LABOR                     DEPARTMENTOF LABOR
                PROJECT IDENTIFICATION
                     REQ     EST    PROJECT
  BUDGET     COMPL   COMPL   COMPL  ASSESS- MEDIA
(THOUSANDS)   STATUS   DATE    DATE   MENT    TYPE
                                                                                                                     DOL-11
                            ADEQUACY OF  PROJECT
                          ENGIN-
                          EERING    TIME     COST
CA-160000909 PROJECT: 310108
ASBESTOS
ACCT: OTHER
SAN DIEGO
IMPERIAL BEACH                   CA

CA-160000909 PROJECT: 320104
ASBESTOS
ACCT: OTHER
SAN DIEGO
IMPERIAL BEACH                   CA

CA-160000909 PROJECT: 330102
ASBESTOS
ACCT: OTHER
SAN DIEGO
IMPERIAL BEACH                   CA

CA-160000909 PROJECT: 340107
ASBESTOS
ACCT: OTHER
SAN DIEGO
IMPERIAL BEACH                   CA

CA-160000909 PROJECT: 340108
ASBESTOS
ACCT: OTHER
SAN DIEGO
IMPERIAL BEACH                   CA

CA-160000909 PROJECT: 410101
ASBESTOS
ACCT: OTHER
SAN DIEGO
IMPERIAL BEACH                   CA
                                                      936.0  ESRO
      260.0   ESRO
      260.0   ESRO
      234.0   ESRO
        3.0   ESRO
       22.6   ESRO
                           90/09  HIGH   MULTI
                                        MEDIA
90/09  HIGH   MULTI
              MEDIA
90/09  HIGH   MULTI
              MEDIA
90/09  HIGH   MULTI
              MEDIA
90/09  HIGH   MULTI
              MEDIA
90/09  HIGH   MULTI
              MEDIA
                        ADEQUATE   ADEQUATE   ADEQUATE
                         DESIGN    TIMING    ESTIMATE
ADEQUATE  ADEQUATE   ADEQUATE
 DESIGN    TIMING    ESTIMATE
ADEQUATE  ADEQUATE   ADEQUATE
 DESIGN    TIMING    ESTIMATE
ADEQUATE  ADEQUATE   ADEQUATE
 DESIGN    TIMING    ESTIMATE
ADEQUATE  ADEQUATE   ADEQUATE
 DESIGN    TIMING    ESTIMATE
ADEQUATE  ADEQUATE   ADEQUATE
 DESIGN    TIMING    ESTIMATE

-------
                                 FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                         DEPARTMENT OF LABOR                     DEPARTMENTOF LABOR
                PROJECT IDENTIFICATION
                     REQ    EST   PROJECT
  BUDGET     COMPL   COMPL  COMPL ASSESS- MEDIA
(THOUSANDS)  STATUS  DATE   DATE  MENT    TYPE
                                                                     DOL-1Z
                            ADEQUACY OF  PROJECT
                          ENGIN-
                          EERING    TIME      COST
CA-160000909 PROJECT: 41010Z
ASBESTOS
ACCT: OTHER
SAN DIEGO
IMPERIAL BEACH                   CA

CA-160000909 PROJECT: 440101
ASBESTOS
ACCT: OTHER
SAN DIEGO
IMPERIAL BEACH                   CA

CA-160000909 PROJECT: 44010Z
ASBESTOS
ACCT: OTHER
SAN DIEGO
IMPERIAL BEACH                   CA

CO-160000803 PROJECT: 1010Z
ASBESTOS
ACCT: OTHER
COLLBRAN
COLLBRAN                         CO

DC-160000307 PROJECT: 10107
ASBESTOS
ACCT: OTHER
POTOMAC
WASHINGTON                       DC

DC-160000307 PROJECT: 10105
ASBESTOS
ACCT: OTHER
POTOMAC
WASHINGTON                       DC
       19.5  ESRO
       30.6  ESRO
       11.7  ESRO
       11.0  OTHR
       26.6  OTHR
        6.3  OTHR
                           90/09  HIGH   MULTI
                                         MEDIA
90/09  HIGH   MULTI
              MEDIA
90/09  HIGH   MULTI
              MEDIA
90/09 MEDIUM  MULTI
              MEDIA
                           90/09 MEDIUM    AIR
                           90/09 MEDIUM    AIR
                        ADEQUATE  ADEQUATE    ADEQUATE
                         DESIGN    TIMING    ESTIMATE
                                                   ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
ADEQUATE  ADEQUATE   ADEQUATE
 DESIGN    TIMING    ESTIMATE
ADEQUATE  ADEQUATE   ADEQUATE
 DESIGN    TIMING    ESTIMATE
                        ADEQUATE  ADEQUATE   ADEQUATE
                         DESIGN   TIMING    ESTIMATE
                        ADEQUATE  ADEQUATE   ADEQUATE
                         DESIGN    TIMING    ESTIMATE

-------
                                 FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR  FISCAL  YEAR  1991

                         DEPARTMENT OF LABOR                     DEPARTMENTOF LABOR
                PROJECT IDENTIFICATION
                                    REQ
                 BUDGET     COMPL   COMPL
               (THOUSANDS)  STATUS  DATE
EST   PROJECT
COMPL ASSESS- MEDIA
DATE  MENT    TYPE
                                                                                                                     DOL-13
  ADEQUACY OF PROJECT
ENGIN-
EERING    TIME      COST
DC-160000307 PROJECT:  10106
ASBESTOS
ACCT: OTHER
POTOMAC
WASHINGTON

FL-160000409 PROJECT:  10105
ASBESTOS
ACCT: OTHER
GAINESVILLE
GAINESVILLE

FL-160000409 PROJECT:  10106
PCB
ACCT: OTHER
GAINESVILLE
GAINESVILLE

FL-160000410 PROJECT:  10101
ASBESTOS
ACCT: OTHER
JACKSONVILLE
JACKSONVILLE

FL-160000418 PROJECT: 30102
ASBESTOS
ACCT: OTHER
MIAMI
MIAMI
GA-1600004Q1 PROJECT:
ASBESTOS
ACCT: OTHER
ATLANTA
ATLANTA
                      10104
DC
FL
FL
FL
                                 FL
GA
                                                       80.0  OTHR
                            OTHR
                      31.8  OTHR
                       6.8  OTHR
                     150.0  OTHR
                                                       11.0  OTHR
                                                                           90/09 MEDIUM
                                          90/09  LOW
                                                          AIR      ADEQUATE  ADEQUATE   ADEQUATE
                                                                   DESIGN    TIMING    ESTIMATE
                                                        MULTI     ADEQUATE  ADEQUATE   ADEQUATE
                                                        MEDIA      DESIGN    TIMING    ESTIMATE
                                          90/09 MEDIUM  MULTI
                                                        MEDIA
                                          90/09  LOW
                                          90/09  LOW
                                                                           90/09  LOW
                       ADEQUATE  ADEQUATE    ADEQUATE
                        DESIGN    TIMING    ESTIMATE
                                                        MULTI      ADEQUATE  ADEQUATE   ADEQUATE
                                                        MEDIA       DESIGN    TIMING    ESTIMATE
                                                        MULTI      ADEQUATE   ADEQUATE    ADEQUATE
                                                        MEDIA       DESIGN     TIMING     ESTIMATE
                                                        MULTI      ADEQUATE   ADEQUATE    ADEQUATE
                                                        MEDIA       DESIGN     TIMING     ESTIMATE

-------
                                 FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                         DEPARTMENT OF LABOR                     DEPARTMENTOF LABOR
                PROJECT IDENTIFICATION
                                               REQ    EST   PROJECT
                            BUDGET     COMPL   COMPL  COMPL ASSESS- MEDIA
                          (THOUSANDS)  STATUS  DATE   DATE  MENT    TYPE
                                                                                               DOL-14
                            ADEQUACY OF PROJECT
                          ENGIN-
                          EERING    TIME      COST
GA-160000404 PROJECT: 10204
FUEL TANKS - UNDERGROUND
ACCT: OTHER
TURNER
ALBANY

GA-160000407 PROJECT: 10101
ASBESTOS
ACCT: OTHER
BRUNSWICK
BRUNSWICK

HI-160000903 PROJECT: 10102
PCB
ACCT: OTHER
HAWAII
HONOLULU

HI-160000903 PROJECT: 10205
FUEL TANKS - UNDERGROUND
ACCT: OTHER
HAWAII
HONOLULU

HI-160000903 PROJECT: 10104
ASBESTOS
ACCT: OTHER
HAWAII
HONOLULU
HI-160000903 PROJECT:
ASBESTOS
ACCT: OTHER
HAWAII
HONOLULU
130101
           GA
           GA
           HI
           HI
           HI
           HI
                                 18.7  OTHR
                                 17.1  OTHR
                                 20.0  ESDF
                                  1.1  ESDF
                                  7.5  ESRO
                                                        9.1  ESRO
90/09 MEDIUM  MULTI     ADEQUATE  ADEQUATE   ADEQUATE
              MEDIA      DESIGN    TIMING    ESTIMATE
90/09  LOW    MULTI     ADEQUATE  ADEQUATE   ADEQUATE
              MEDIA      DESIGN    TIMING    ESTIMATE
90/09 MEDIUM  MULTI
              MEDIA
                                                     90/09 MEDIUM  MULTI
                                                                  MEDIA
90/09 MEDIUM  MULTI
              MEDIA
90/09  HIGH   MULTI
              MEDIA
                                                                            ADEQUATE  ADEQUATE   ADEQUATE
                                                                             DESIGN    TIMING    ESTIMATE
                        ADEQUATE  ADEQUATE   ADEQUATE
                         DESIGN    TIMING   ESTIMATE
                                                                            ADEQUATE  ADEQUATE   ADEQUATE
                                                                             DESIGN    TIMING    ESTIMATE
                                                                            ADEQUATE  ADEQUATE   ADEQUATE
                                                                             DESIGN    TIMING    ESTIMATE

-------
                                 FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                         DEPARTMENT OF LABOR                     DEPARTMENTOF LABOR
                PROJECT IDENTIFICATION
                     REQ     EST    PROJECT
  BUDGET     COMPL    COMPL   COMPL  ASSESS- MEDIA
(THOUSANDS)   STATUS   DATE    DATE   MENT    TYPE
                                                                                                                     DOL-15
                            ADEQUACY  OF  PROJECT
                          ENGIN-
                          EERING    TIME     COST
HI-160000903 PROJECT: 150103
ASBESTOS
ACCT: OTHER
HAWAII
HONOLULU                         HI

IA-160000702 PROJECT: 10101
ASBESTOS
ACCT: OTHER
DENISON
DENISON                          IA

ID-160001006 PROJECT: 10103
ASBESTOS
ACCT: OTHER
MARSING
MARSING                          ID

IL-160000506 PROJECT: 10109
ASBESTOS
ACCT: OTHER
JOLIET
JOLIET                           IL

IL-160000511 PROJECT: 10101
ASBESTOS
ACCT: OTHER
GOLCONDA
GOLCONDA                         IL

IN-160000501 PROJECT: 10208
FUEL TANKS - UNDERGROUND
ACCT: OTHER
ATTERBURY
EDINBURGH                        IN
                                                       18.2  ESRO
             OTHR
       10.2   OTHR
       27,4  OTHR
        9.3  OTHR
        8.2   OTHR
                           90/09  HIGH   MULTI
                                        MEDIA
90/09 MEDIUM  MULTI
              MEDIA
90/09 MEDIUM  MULTI
              MEDIA
90/09 MEDIUM  MULTI
              MEDIA
90/09 MEDIUM  MULTI
              MEDIA
90/09 MEDIUM  MULTI
              MEDIA
                        ADEQUATE   ADEQUATE
                         DESIGN    TIMING
  NOT
 AVAIL
                                                              NOT
                                                             AVAIL
  NOT
 AVAIL
 NOT
AVAIL
                     ADEQUATE
                     ESTIMATE
            NOT
           AVAIL
ADEQUATE  ADEQUATE   ADEQUATE
 DESIGN    TIMING    ESTIMATE
                                                                         NOT
                                                                        AVAIL
ADEQUATE  ADEQUATE   ADEQUATE
 DESIGN    TIMING    ESTIMATE
                                                  ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE

-------
                                 FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                         DEPARTMENT OF LABOR                     DEPARTMENTOF LABOR
                PROJECT IDENTIFICATION
                     REQ    EST   PROJECT
  BUDGET     COMPL   COMPL  COMPL ASSESS- MEDIA
(THOUSANDS)  STATUS  DATE   DATE  MENT    TYPE
                                                                      DOL-16
                            ADEQUACY OF PROJECT
                          ENGIN-
                          EERING    TIME      COST
IN-160000501 PROJECT: 10209
ASBESTOS
ACCT: OTHER
ATTERBURY
EDINBURGH                        IN

IN-160000501 PROJECT: 10104
ASBESTOS
ACCT: OTHER
ATTERBURY
EDINBURGH                        IN

KS-160000706 PROJECT: 10102
FUEL TANKS - UNDERGROUND
ACCT: OTHER
KANSAS
MANHATTAN                        KS

KS-160000706 PROJECT: 20101
ASBESTOS
ACCT: OTHER
KANSAS
MANHATTAN                        KS

KS-160000706 PROJECT: 10101
SEWER AND STORM DRAINAGE
ACCT: OTHER
KANSAS
MANHATTAN                        KS

KY-160000402 PROJECT: 10109
ASBESTOS
ACCT: OTHER
E. C. CLEMENTS
MORGANFIELD                      KY
      207.8  OTHR
       32,4  OTHR
       20.0  ESDP
      380.0  OTHR
       50.0  OTHR
      111.0  OTHR
90/09 MEDIUM  MULTI     ADEQUATE  ADEQUATE   ADEQUATE
              MEDIA      DESIGN    TIMING    ESTIMATE
90/09 MEDIUM  MULTI     ADEQUATE  ADEQUATE    ADEQUATE
              MEDIA      DESIGN    TIMING    ESTIMATE
90/09  HIGH   MULTI
              MEDIA
90/09 MEDIUM  MULTI
              MEDIA
                                                  ADEQUATE  ADEQUATE     LOW
                                                   DESIGN    TIMING    ESTIMATE
                                                    NOT       NOT
                                                   AVAIL     AVAIL
 NOT
AVAIL
90/09 MEDIUM  MULTI     ADEQUATE   ADEQUATE   ADEQUATE
              MEDIA      DESIGN    TIMING    ESTIMATE
90/09  LOW    MULTI     ADEQUATE   ADEQUATE   ADEQUATE
              MEDIA      DESIGN   TIMING    ESTIMATE

-------
                                  FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                          DEPARTMENT OF LABOR                     DEPARTMENTOF LABOR
                 PROJECT  IDENTIFICATION
                     REQ     EST    PROJECT
  BUDGET     COMPL    COMPL   COMPL  ASSESS- MEDIA
(THOUSANDS)   STATUS   DATE    DATE   MENT    TYPE
                                                                     DOL-17
    ADEQUACY OF PROJECT
  ENGIN-
  EERING    TIME      COST
 KY-160000402  PROJECT:  10206
 FUEL TANKS -  UNDERGROUND
 ACCT:  OTHER
 E.  C.  CLEMENTS
 MORGANFIELD                     KY

 KY-160000403  PROJECT:  10104
 ASBESTOS
 ACCT:  OTHER
 WHITNEY YOUNG
 SIMPSONVILLE                     KY

 KY-160000403  PROJECT:  10102
 DOMESTIC WATER
 ACCT:  OTHER
 WHITNEY YOUNG
 SIMPSONVILLE                     KY
                                                       22.8  OTHR
       14.5   OTHR
      252.0   OTHR
                           90/09 MEDIUM  MULTI
                                        MEDIA
                           90/09   LOW    MULTI
                                        MEDIA
                           90/09  HIGH   MULTI
                                        MEDIA
ADEQUATE  ADEQUATE   ADEQUATE
 DESIGN    TIMING    ESTIMATE
ADEQUATE  ADEQUATE   ADEQUATE
 DESIGN    TIMING    ESTIMATE
ADEQUATE  ADEQUATE
 DESIGN    TIMING
ADEQUATE
ESTIMATE
KY-160000403 PROJECT:  10103
DOMESTIC WATER
ACCT: OTHER
WHITNEY YOUNG
SIMPSONVILLE                     KY

KY-160000413 PROJECT:  10101
ASBESTOS
ACCT: OTHER
CARL D. PERKINS
PRESTONSBURS                     KY

KY-160000414 PROJECT:  10102
ASBESTOS
ACCT: OTHER
GREAT ONYX
MAMMOTH CAVE                     KY
                                                      230.0  OTHR
        6.7   OTHR
        8.4   OTHR
                           90/09  HIGH   MULTI
                                        MEDIA
                           90/09   LOW
                           90/09   LOW
                                        MULTI
                                        MEDIA
                                        MULTI
                                        MEDIA
ADEQUATE  ADEQUATE   ADEQUATE
 DESIGN    TIMING    ESTIMATE
ADEQUATE  ADEQUATE   ADEQUATE
 DESIGN    TIMING    ESTIMATE
ADEQUATE  ADEQUATE   ADEQUATE
 DESIGN    TIMING    ESTIMATE

-------
                                 FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                         DEPARTMENT OF LABOR                     DEPARTMENTOF LABOR
                PROJECT IDENTIFICATION
                                    REQ    EST   PROJECT
                 BUDGET     COMPL   COMPL  COMPL ASSESS- MEDIA
               (THOUSANDS)  STATUS  DATE   DATE  MENT    TYPE
                                                                                     DOL-18
                            ADEQUACY OF PROJECT
                          ENGIN-
                          EERING    TIME      COST
KY-160000421 PROJECT: 10102
ASBESTOS
ACCT: OTHER
PINE KNOT
PINE KNOT

KY-160000424 PROJECT: 10102
ASBESTOS
ACCT: OTHER
FRENCHBURG
MARIBA

MA-160000101 PROJECT: 10103
PCB
ACCT: OTHER
WESTOVER
CHICOPEE

MA-160000101 PROJECT: 10105
ASBESTOS
ACCT: OTHER
WESTOVER
CHICOPEE

MA-160000104 PROJECT: 10109
ASBESTOS
ACCT: OTHER
GRAFTON
NORTH GRAFTON
MA-160000104 PROJECT:
ASBESTOS
ACCT: OTHER
GRAFTON
NORTH GRAFTON
                      10104
KY
KY
MA
MA
MA
MA
                       9.9  OTHR
                       7.5  OTHR
                      21.8  ESDF
                      23.8  OTHR
                     200.8  OTHR
                                                      642.2  OTHR
                                          90/09  LOW    MULTI
                                                        MEDIA
90/09  LOW    MULTI
              MEDIA
                                          90/09 MEDIUM   SOLID
                                                         WASTE
                                          90/09 MEDIUM   SOLID
                                                         WASTE
                                          90/09 MEDIUM   SOLID
                                                         WASTE
                                          90/09  HIGH     SOLID
                                                         WASTE
                        ADEQUATE  ADEQUATE    ADEQUATE
                         DESIGN    TIMING    ESTIMATE
                                                                  ADEQUATE  ADEQUATE
                                                                   DESIGN    TIMING
                          NOT
                         AVAIL
                          NOT
                         AVAIL
                          NOT
                         AVAIL
                         NOT
                        AVAIL
 NOT
AVAIL
 NOT
AVAIL
 NOT
AVAIL
 NOT
AVAIL
          ADEQUATE
          ESTIMATE
 NOT
AVAIL
 NOT
AVAIL
 NOT
AVAIL
 NOT
AVAIL

-------
                                  FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                          DEPARTMENT OF  LABOR                     DEPARTMENTOF LABOR
                 PROJECT  IDENTIFICATION
                     REQ    EST    PROJECT
  BUDGET     COMPL   COMPL  COMPL  ASSESS- MEDIA
(THOUSANDS)   STATUS  DATE    DATE   MENT    TYPE
                                                                                                                      DOL-19
                            ADEQUACY  OF  PROJECT
                          ENGIN-
                          EERING   TIME      COST
 MA-160000104 PROJECT:  10211
 FUEL TANKS - UNDERGROUND
 ACCT:  OTHER
 GRAFTON
 NORTH  GRAFTON                   MA

 MD-160000301 PROJECT:  10103
 ASBESTOS
 ACCT:  OTHER
 WOODSTOCK
 WOODSTOCK                        MD

 MD-160000301  PROJECT:  10302
 FUEL TANKS  - UNDERGROUND
 ACCT:  OTHER
 WOODSTOCK
 WOODSTOCK                        MD

 MD-160000306  PROJECT:  10103
 ASBESTOS
 ACCT:  OTHER
 WOODLAND
 LAUREL                           MD

 MD-160000310  PROJECT:  10102
 ASBESTOS
 ACCT: OTHER
 CHESAPEAKE
 PORT DEPOSIT                     MD

 MD-160000310  PROJECT:  10210
 FUEL TANKS  - UNDERGROUND
ACCT: OTHER
CHESAPEAKE
PORT DEPOSIT                     MD
                                                        3.2  ESDF
       28.3  OTHR
       24.5  ESDF
       22.5   OTHR
      161.2   OTHR
      194.9   ESDF
                                                                           90/09 MEDIUM   WATER
                           90/09  MEDIUM    AIR
90/09 MEDIUM   SOLID
               WASTE
90/09 MEDIUM    AIR
                           90/09  MEDIUM    AIR
90/09 MEDIUM   SOLID
               WASTE
                                                    NOT
                                                   AVAIL
                                    NOT
                                   AVAIL
                       NOT
                      AVAIL
                                                  ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
                                                  ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
ADEQUATE  ADEQUATE   ADEQUATE
 DESIGN    TIMING    ESTIMATE
                                                  ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
                                                  ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE

-------
                                 FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                         DEPARTMENT OF LABOR                     DEPARTMENTOF LABOR
                PROJECT IDENTIFICATION
                     REQ    EST   PROJECT
  BUDGET     COMPL   COMPL  COMPL ASSESS- MEDIA
(THOUSANDS)  STATUS  DATE   DATE  MENT    TYPE
                                                                                                                      DOL-20
                            ADEQUACY OF PROJECT
                          ENGIN-
                          EERING    TIME      COST
ME-160000103 PROJECT: 10103
PCB
ACCT: OTHER
PENOBSCOT
BANGOR                           ME

ME-160000103 PROJECT: 10102
ASBESTOS
ACCT: OTHER
PENOBSCOT
BANGOR                           ME

ME-160000103 PROJECT: 10101
DOMESTIC WATER
ACCT: OTHER
PENOBSCOT
BANGOR                           ME

MI-160000504 PROJECT: 10101
ASBESTOS
ACCT: OTHER
DETROIT
DETROIT                          MI

MI-160000507 PROJECT: 10109
ASBESTOS
ACCT: OTHER
GRAND RAPIDS
GRAND RAPIDS                     MI

MN-160000509 PROJECT: 10104
ASBESTOS
ACCT: OTHER
HUBERT HUMPHREY
ST PAUL                          MN
        5.4  ESDL
       14.8  OTHR
      170.0  OTHR
        6.6  OTHR
       20.3  OTHR
       15.2  OTHR
90/09  LOW     SOLID      NOT       NOT        NOT
               WASTE     AVAIL     AVAIL      AVAIL
90/09 MEDIUM   SOLID      NOT       NOT        NOT
               WASTE     AVAIL     AVAIL      AVAIL
90/09 MEDIUM   WATER      NOT       NOT        NOT
                         AVAIL     AVAIL      AVAIL
90/09 MEDIUM  MULTI     ADEQUATE   ADEQUATE    ADEQUATE
              MEDIA      DESIGN    TIMING     ESTIMATE
90/09 MEDIUM  MULTI
              MEDIA
90/09 MEDIUM  MULTI
              MEDIA
ADEQUATE  ADEQUATE   ADEQUATE
 DESIGN    TIMING    ESTIMATE
ADEQUATE  ADEQUATE   ADEQUATE
 DESIGN    TIMING    ESTIMATE

-------
                                  FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                          DEPARTMENT  OF  LABOR                     DEPARTMENTOF LABOR
                 PROJECT IDENTIFICATION
                                    REQ    EST   PROJECT
                 BUDGET     COMPL   COMPL  COMPL ASSESS- MEDIA
               (THOUSANDS)  STATUS  DATE   DATE  MENT    TYPE
                                                                                                                      DOL-21
    ADEQUACY OF PROJECT
  ENGIN-
  EERING    TIME      COST
 MO-160000701  PROJECT:  10104
 PCB
 ACCT:  OTHER
 EXCELSIOR  SPR.
 EXCELSIOR  SPRINGS

 MO-160000701  PROJECT:  10105
 ASBESTOS
 ACCT:  OTHER
 EXCELSIOR  SPR.
 EXCELSIOR  SPRINGS

 MO-160000701  PROJECT:  10205
 FUEL TANKS -  UNDERGROUND
 ACCT:  OTHER
 EXCELSIOR  SPR.
 EXCELSIOR  SPRINGS

 MO-160000704  PROJECT:  10101
 ASBESTOS
 ACCT:  OTHER
 MINGO
 PUXICO

 MS-160000411  PROJECT:  20110
 ASBESTOS
 ACCT: OTHER
 GULFPORT
 GULFPORT
MS-160000412 PROJECT:
ASBESTOS
ACCT: OTHER
BATESVILLE
BATESVILLE
                      10102
MO
MO
MO
MO
MS
MS
                                                        6.2  OTHR
                      21.6  OTHR
                      10.6  OTHR
                      40.0  OTHR
                                                       11.6  OTHR
                                          90/09  LOW    MULTI
                                                        MEDIA
                                          90/09 MEDIUM  MULTI
                                                        MEDIA
                                          90/09 MEDIUM  MULTI
                                                        MEDIA
                                          90/09 MEDIUM  MULTI
                                                        MEDIA
ADEQUATE  ADEQUATE   ADEQUATE
 DESIGN    TIMING    ESTIMATE
                                          90/09  LOW
                                                                           90/09  LOW
                                                        MULTI
                                                        MEDIA
                                                        MULTI
                                                        MEDIA
  NOT
 AVAIL
  NOT
 AVAIL
  NOT
 AVAIL
 NOT
AVAIL
 NOT
AVAIL
 NOT
AVAIL
 NOT
AVAIL
 NOT
AVAIL
 NOT
AVAIL
ADEQUATE  ADEQUATE   ADEQUATE
 DESIGN    TIMING    ESTIMATE
ADEQUATE  ADEQUATE   ADEQUATE
 DESIGN    TIMING    ESTIMATE

-------
                                 FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                         DEPARTMENT OF LABOR                     DEPARTMENTOF LABOR
                PROJECT IDENTIFICATION
                     REQ    EST   PROJECT
  BUDGET     COMPL   COMPL  COMPL ASSESS- MEDIA
(THOUSANDS)  STATUS  DATE   DATE  MENT    TYPE
                                                                      DOL-22
                            ADEQUACY OF PROJECT
                          ENGIN-
                          EERING    TIME      COST
MS-160000417 PROJECT: 10205
FUEL TANKS - UNDERGROUND
ACCT: OTHER
MISSISSIPPI
CRYSTAL SPRINGS                  MS

MS-160000417 PROJECT: 10102
ASBESTOS
ACCT: OTHER
MISSISSIPPI
CRYSTAL SPRINGS                  MS

MT-160000802 PROJECT: 10102
ASBESTOS
ACCT: OTHER
KICKING HORSE
RONAN                            MT

MT-160000805 PROJECT: 10103
ASBESTOS
ACCT: OTHER
ANACONDA
ANACONDA                         MT

MT-160000805 PROJECT: 10307
SEWAGE TREATMENT
ACCT: OTHER
ANACONDA
ANACONDA                         MT

MT-160000805 PROJECT: 10308
SEWAGE TREATMENT
ACCT: OTHER
ANACONDA
ANACONDA                         MT
        6.9  ESDF
       12.1  OTHR
       10.2  OTHR
       10.0  OTHR
       20.0  OTHR
        6.8
90/09 MEDIUM  MULTI
              MEDIA
90/09  LOW    MULTI
              MEDIA
90/09 MEDIUM  MULTI
              MEDIA
90/09 MEDIUM  MULTI
              MEDIA
90/09 MEDIUM  MULTI
              MEDIA
90/09 MEDIUM  MULTI
              MEDIA
                                                   ADEQUATE  ADEQUATE   ADEQUATE
                                                    DESIGN    TIMING    ESTIMATE
                                                  ADEQUATE  ADEQUATE
                                                    DESIGN    TIMING
                                                  ADEQUATE  ADEQUATE
                                                   DESIGN    TIMING
                                                  ADEQUATE  ADEQUATE
                                                   DESIGN    TIMING
                                                    NOT
                                                   AVAIL
                                                    NOT
                                                   AVAIL
 NOT
AVAIL
 NOT
AVAIL
          ADEQUATE
          ESTIMATE
          ADEQUATE
          ESTIMATE
          ADEQUATE
          ESTIMATE
 NOT
AVAIL
 NOT
AVAIL

-------
                                  FEDERAL  AGENCY  POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                          DEPARTMENT  OF  LABOR                     DEPARTMENTOF LABOR
                 PROJECT IDENTIFICATION
  BUDGET     COMPL
(THOUSANDS)   STATUS
REQ    EST   PROJECT
COMPL  COMPL ASSESS- MEDIA
DATE   DATE  MENT    TYPE
                                                                     DOL-23
  ADEQUACY OF PROJECT
ENGIN-
EERING    TIME      COST
 MT-160000807 PROJECT:  10101
 ASBESTOS
 ACCT:  OTHER
 TRAPPER  CREEK
 DARBY                            MT

 NC-160000406 PROJECT:  10103
 ASBESTOS
 ACCT:  OTHER
 KITTRELL
 KITTRELL                        NC

 NC-160000406 PROJECT:  10304
 SITE DRAINAGE
 ACCT:  OTHER
 KITTRELL
 KITTRELL                        NC

 NC-160000406 PROJECT:  10305
 SITE DRAINAGE
 ACCT:  OTHER
 KITTRELL
 KITTRELL                        NC

 NC-160000406  PROJECT:  10307
 SITE DRAINAGE
 ACCT: OTHER
 KITTRELL
 KITTSELL                         NC

 NC-160000420  PROJECT: 310101
 ASBESTOS
ACCT: OTHER
 L. B. JOHNSON
FRANKLIN                         NC
                                                        10.3  OTHR
       10.3
         .0   OTHR
       16.5   OTHR
       12.0  OTHR
       10.0  OTHR
                           90/09 MEDIUM  MULTI
                                        MEDIA
                           90/09   LOW    MULTI
                                        MEDIA
                              ADEQUATE   ADEQUATE   ADEQUATE
                               DESIGN    TIMING    ESTIMATE
                              ADEQUATE   ADEQUATE   ADEQUATE
                               DESIGN    TIMING    ESTIMATE
                          90/09  HIGH   MULTI     ADEQUATE  ADEQUATE   ADEQUATE
                                        MEDIA      DESIGN    TIMING    ESTIMATE
                           90/09  HIGH   MULTI
                                        MEDIA
                          90/09  HIGH   MULTI
                                        MEDIA
                              ADEQUATE   ADEQUATE   ADEQUATE
                               DESIGN    TIMING    ESTIMATE
                              ADEQUATE   ADEQUATE   ADEQUATE
                               DESIGN     TIMING    ESTIMATE
                          90/09  LOW    MULTI     ADEQUATE  ADEQUATE   ADEQUATE
                                        MEDIA      DESIGN    TIMING    ESTIMATE

-------
                                 FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                         DEPARTMENT OF LABOR                     DEPARTMENTOF LABOR
                PROJECT IDENTIFICATION
                     REQ    EST   PROJECT
  BUDGET     COMPL   COMPL  COMPL ASSESS- MEDIA
(THOUSANDS)   STATUS  DATE   DATE  MENT    TYPE
                                                                                                                     DOL-24
                            ADEQUACY  OF  PROJECT
                          ENGIN-
                          EERING    TIME      COST
NC-160000422 PROJECT: 10103
ASBESTOS
ACCT: OTHER
SCHENCK
PISGAH FOREST                    NC

NC-160000423 PROJECT: 10101
ASBESTOS
ACCT: OTHER
OCONALUFTEE
CHEROKEE                         NC

NE-160000705 PROJECT: 10102
ASBESTOS
ACCT: OTHER
PINE RIDGE
CHADRON                          NE

NJ-160000202 PROJECT: 10110
ASBESTOS
ACCT: OTHER
EDISON
EDISON                           NJ

NM-160000607 PROJECT: 10102
ASBESTOS
ACCT: OTHER
ROSWELL
ROSWELL                          NM

NV-160000907 PROJECT: 10207
FUEL TANKS - UNDERGROUND
ACCT: OTHER
SIERRA NEVADA
RENO                             NV
       10.9  OTHR
        9.3  OTHR
       10.8  OTHR
       12.0  OTHR
       24.2  ESDL
      170.7  ESDF
90/09  LOW    MULTI
              MEDIA
90/09  LOW    MULTI
              MEDIA
                           90/09  LOW    MULTI
                                         MEDIA
90/09 MEDIUM   SOLID
               WASTE
                           90/09 MEDIUM    AIR
90/09 MEDIUM  MULTI
              MEDIA
                                                   ADEQUATE  ADEQUATE   ADEQUATE
                                                    DESIGN    TIMING    ESTIMATE
ADEQUATE  ADEQUATE
 DESIGN    TIMING
                          NOT
                         AVAIL
            NOT
           AVAIL
ADEQUATE  ADEQUATE
 DESIGN    TIMING
                        ADEQUATE   ADEQUATE
                         DESIGN    TIMING
                                                    NOT
                                                    AVAIL
            NOT
           AVAIL
                                                                       ADEQUATE
                                                                       ESTIMATE
 NOT
AVAIL
                                                                       ADEQUATE
                                                                       ESTIMATE
                     ADEQUATE
                     ESTIMATE
 NOT
AVAIL

-------
                                  FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                          DEPARTMENT  OF  LABOR                     DEPARTMENTOF LABOR
                 PROJECT IDENTIFICATION
                                    REQ    EST   PROJECT
                 BUDGET     COMPL   COMPL  COMPL ASSESS- MEDIA
               (THOUSANDS)  STATUS  DATE   DATE  MENT    TYPE
                                                                                                                      DOL-25
             ADEQUACY OF PROJECT
           ENGIN-
           EERING    TIME      COST
 NV-160000907 PROJECT:  10103
 ASBESTOS
 ACCT:  OTHER
 SIERRA NEVADA
 RENO

 NY-160000201 PROJECT:  10207
 FUEL TANKS - UNDERGROUND
 ACCT:  OTHER
 6LENMONT
 6LENMONT

 NY-160000201  PROJECT:  10107
 ASBESTOS
 ACCT:  OTHER
 GLENMONT
 GLENMONT

 NY-160000205  PROJECT:  10203
 FUEL TANKS  -  UNDERGROUND
 ACCT:  OTHER
 ONEONTA
 ONEONTA

 NY-160000205  PROJECT:  10103
 ASBESTOS
 ACCT:  OTHER
 ONEONTA
 ONEONTA
NY-160000206 PROJECT:
ASBESTOS
ACCT: OTHER
CASSADAGA
CASSADAGA
                      10105
NV
NY
NY
NY
                                 NY
NY
                                                       27.7  ESRO
                       5.7  PSDF
                      18.2  OTHR
                      49.0  PSDF
                     230.7  OTHR
                                                       85.5  OTHR
                                                                           90/09 MEDIUM
                                          90/09 MEDIUM
                                          90/09 MEDIUM
                                                        MULT I
                                                        MEDIA
                                                         SOLID
                                                         WASTE
SOLID
WASTE
                                          90/09 MEDIUM   SOLID
                                                         WASTE
                                          90/09 MEDIUM   SOLID
                                                         WASTE
                                          90/09 MEDIUM   SOLID
                                                         WASTE
         ADEQUATE  ADEQUATE   ADEQUATE
          DESIGN    TIMING    ESTIMATE
         ADEQUATE  ADEQUATE   ADEQUATE
          DESIGN    TIMING    ESTIMATE
ADEQUATE  ADEQUATE   ADEQUATE
 DESIGN    TIMING    ESTIMATE
         ADEQUATE  ADEQUATE   ADEQUATE
          DESIGN    TIMING    ESTIMATE
         ADEQUATE  ADEQUATE   ADEQUATE
          DESIGN    TIMING    ESTIMATE
         ADEQUATE  ADEQUATE   ADEQUATE
          DESIGN    TIMING    ESTIMATE

-------
                                 FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                         DEPARTMENT OF LABOR                     DEPARTMENTOF LABOR
                PROJECT IDENTIFICATION
                     REQ    EST   PROJECT
  BUDGET     COMPL   COMPL  COMPL ASSESS- MEDIA
(THOUSANDS)   STATUS  DATE   DATE  MENT    TYPE
                                                                                                                      DOL-26
             ADEQUACY OF PROJECT
           ENGIN-
           EERING    TIME      COST
NY-160000206 PROJECT: 10202
FUEL TANKS - ABOVEGROUND
ACCT: OTHER
CASSADAGA
CASSADAGA                        NY

NY-160000207 PROJECT: 10202
FUEL TANKS - UNDERGROUND
ACCT: OTHER
DELAWARE VALLEY
CALLICOON                        NY

NY-160000208 PROJECT: 10202
FUEL TANKS - UNDERGROUND
ACCT: OTHER
BRONX
BRONX                            NY

NY-160000208 PROJECT: 10105
ASBESTOS
ACCT: OTHER
BRONX
BRONX                            NY

NY-160000210 PROJECT: 10103
ASBESTOS
ACCT: OTHER
IROSUOI5
MEDINA                           NY

NY-160000211 PROJECT: 10104
ASBESTOS
ACCT: OTHER
GATEWAY
BROOKLYN                         NY
        5.5  PSDF
        3.8  PSDF
        5.7  PSDF
       10.6  OTHR
             ESDL
       13.1   ESDL
                           90/09 MEDIUM   WATER
                           90/09 MEDIUM
                           90/09 MEDIUM
                           90/09 MEDIUM
                           90/09  MEDIUM
                           90/09  MEDIUM
                                          SOLID
                                          WASTE
SOLID
WASTE
                                          SOLID
                                          WASTE
                                         MULTI
                                         MEDIA
                                         MULTI
                                         MEDIA
         ADEQUATE  ADEQUATE   ADEQUATE
          DESIGN    TIMING    ESTIMATE
         ADEQUATE  ADEQUATE   ADEQUATE
          DESIGN    TIMING    ESTIMATE
ADEQUATE  ADEQUATE   ADEQUATE
 DESIGN    TIMING    ESTIMATE
         ADEQUATE  ADEQUATE   ADEQUATE
          DESIGN    TIMING    ESTIMATE
         ADEQUATE  ADEQUATE   ADEQUATE
          DESIGN    TIMING    ESTIMATE
         ADEQUATE  ADEQUATE   ADEQUATE
          DESIGN    TIMING    ESTIMATE

-------
                                  FEDERAL  AGENCY  POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                          DEPARTMENT  OF  LABOR                     DEPARTMENTOF LABOR
                 PROJECT IDENTIFICATION
                     REQ    EST    PROJECT
  BUDGET     COMPL   COMPL   COMPL  ASSESS- MEDIA
(THOUSANDS)   STATUS  DATE    DATE   MENT    TYPE
                                                                                                                      DOL-27
    ADEQUACY OF PROJECT
  ENGIN-
  EERING    TIME      COST
 OH-160000502 PROJECT:  10119
 SITE DRAINAGE
 ACCT:  OTHER
 CLEVELAND
 CLEVELAND                        OH

 OH-160000503 PROJECT:  10103
 ASBESTOS
 ACCT:  OTHER
 CINCINNATI
 CINCINNATI                        OH

 OH-160000505 PROJECT:  10105
 ASBESTOS
 ACCT:  OTHER
 DAYTON
 DAYTON                           OH

 OK-160000602  PROJECT:  10106
 PCB
 ACCT:  OTHER
 TULSA
 TULSA                             OK

 OK-160000603  PROJECT:  10104
 ASBESTOS
 ACCT:  OTHER
 GUTHRIE
 GUTHRIE                           OK

 OK-160000603  PROJECT:  10203
 FUEL TANKS -  UNDERGROUND
ACCT: OTHER
GUTHRIE
GUTHRIE                          OK
                                                       27.1  OTHR
        9.6   OTHR
       16.3  OTHR
                           90/09  MEDIUM  MULTI
                                        MEDIA
                           90/09  MEDIUM  MULTI
                                        MEDIA
ADEQUATE  ADEQUATE   ADEQUATE
 DESIGN    TIMING    ESTIMATE
ADEQUATE  ADEQUATE   ADEQUATE
 DESIGN    TIMING    ESTIMATE
                           90/09  MEDIUM  MULTI     ADEQUATE  ADEQUATE   ADEQUATE
                                        MEDIA      DESIGN    TIMING    ESTIMATE
       43.0   ESDP    90/09   90/09   HIGH    TOXIC    ADEQUATE  OVERDUE    ADEQUATE
                                        SUBSTANCE   DESIGN    TIMING    ESTIMATE
       23.0   OTHR
                           90/09  MEDIUM    AIR
        5.7   ESDF    92/12   90/09  MEDIUM   SOLID
                                         WASTE
                                                  ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
ADEQUATE  ADEQUATE   ADEQUATE
 DESIGN    TIMING    ESTIMATE

-------
                                 FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                         DEPARTMENT OF LABOR                     DEPARTMENTOF LABOR
                PROJECT IDENTIFICATION
                     REQ    EST   PROJECT
  BUDGET     COMPL   COMPL  COMPL ASSESS- MEDIA
(THOUSANDS)  STATUS  DATE   DATE  MENT    TYPE
                                                                      DOL-28
                            ADEQUACY OF PROJECT
                          ENGIN-
                          EERING    TIME      COST
OK-160000609 PROJECT: 10101
ASBESTOS
ACCT: OTHER
TALKING LEAVES
TAHLEQUAH                        OK

OK-160000609 PROJECT: 10301
FUEL TANKS - UNDERGROUND
ACCT: OTHER
TALKING LEAVES
TAHLEQUAH                        OK

OK-160000614 PROJECT: 10106
ASBESTOS
ACCT: OTHER
TREASURE LAKE
INDIAHOMA                        OK

OR-160001001 PROJECT: 10103
ASBESTOS
ACCT: OTHER
SPRINGDALE
TROUTDALE                        OR

OR-160001002 PROJECT: 10105
FUEL TANKS - UNDERGROUND
ACCT: OTHER
TONGUE POINT
ASTORIA                          OR

OR-160001002 PROJECT: 10106
ASBESTOS
ACCT: OTHER
TONGUE POINT
ASTORIA                          OR
             OTHR
                           90/09 MEDIUM    AIR
                                                   ADEQUATE   ADEQUATE    ADEQUATE
                                                    DESIGN    TIMING    ESTIMATE
       17.1  ESDF   92/12  90/09 MEDIUM   SOLID    ADEQUATE   ADEQUATE    ADEQUATE
                                          WASTE     DESIGN    TIMING     ESTIMATE
       10.5  OTHR
        6.0  OTHR
    1,067.1   OTHR
       40.2   OTHR
                           90/09 MEDIUM    AIR
                           90/09 MEDIUM  MULTI
                                         MEDIA
                        ADEQUATE  ADEQUATE   ADEQUATE
                         DESIGN    TIMING    ESTIMATE
                        ADEQUATE  ADEQUATE   ADEQUATE
                         DESIGN    TIMING    ESTIMATE
90/09 MEDIUM  MULTI     ADEQUATE  ADEQUATE   ADEQUATE
              MEDIA      DESIGN    TIMING    ESTIMATE
90/09 MEDIUM  MULTI     ADEQUATE  ADEQUATE   ADEQUATE
              MEDIA      DESIGN    TIMING    ESTIMATE

-------
                                  FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                          DEPARTMENT OF  LABOR                     DEPARTMENTOF LABOR
                 PROJECT IDENTIFICATION
                     REQ     EST    PROJECT
  BUDGET     COMPL    COMPL   COMPL  ASSESS- MEDIA
(THOUSANDS)   STATUS   DATE    DATE   MENT    TYPE
                                                                                                                      DOL-29
                            ADEQUACY  OF  PROJECT
                          ENGIN-
                          EERING    TIME      COST
 OR-160001002 PROJECT:  10107
 PCB
 ACCT:  OTHER
 TONGUE POINT
 ASTORIA                         OR

 OR-160001007 PROJECT:  10105
 ASBESTOS
 ACCT:  OTHER
 ANGELL
 YACHATS                         OR

 OR-160001009 PROJECT:  10107
 ASBESTOS
 ACCT:  OTHER
 TIMBER  LAKE
 ESTACADA                         OR

 OR-160001010  PROJECT:  10103
 ASBESTOS
 ACCT: OTHER
 WOLF CREEK
 GLIDE                            OR

 PA-160000304  PROJECT:  10105
 ASBESTOS
 ACCT: OTHER
 KEYSTONE
 DRUMS                            PA

 PA-160000304  PROJECT:  340303
 SITE DRAINAGE
 ACCT: OTHER
KEYSTONE
DRUMS                            PA
                                                             OTHR
        9.3  OTHR
        6.5  OTHR
        8.2   OTHR
       25.1   OTHR
        1.5   OTHR
                           90/09 MEDIUM  MULTI
                                        MEDIA
                           90/09 MEDIUM  MULTI
                                        MEDIA
90/09 MEDIUM  MULTI
              MEDIA
                           90/09 MEDIUM  MULTI
                                        MEDIA
                           90/09 MEDIUM    AIR
                           90/09 MEDIUM  MULTI
                                        MEDIA
                        ADEQUATE   ADEQUATE
                         DESIGN    TIMING
                     ADEQUATE
                     ESTIMATE
                        ADEQUATE   ADEQUATE    ADEQUATE
                         DESIGN    TIMING    ESTIMATE
ADEQUATE  ADEQUATE   ADEQUATE
 DESIGN    TIMING    ESTIMATE
                        ADEQUATE  ADEQUATE   ADEQUATE
                         DESIGN    TIMING    ESTIMATE
                                                  ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
                        ADEQUATE  ADEQUATE   ADEQUATE
                         DESIGN    TIMING    ESTIMATE

-------
                                 FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                         DEPARTMENT OF LABOR                     DEPARTMENTOF LABOR
                PROJECT IDENTIFICATION
                                    REq    EST   PROJECT
                 BUDGET     COMPL   COMPL  COMPL ASSESS- MEDIA
               (THOUSANDS)  STATUS  DATE   DATE  MENT    TYPE
                                                                                     DOL-30
                            ADEQUACY OF PROJECT
                          ENGIN-
                          EERING    TIME      COST
PA-160000304 PROJECT: 00203
FUEL TANKS - UNDERGROUND
ACCT: OTHER
KEYSTONE
DRUMS

PA-160000305 PROJECT: 10101
ASBESTOS
ACCT: OTHER
PITTSBURGH
PITTSBURGH

PA-160000308 PROJECT: 10101
ASBESTOS
ACCT: OTHER
RED ROCK
LOPEZ

PA-160000308 PROJECT: 10203
FUEL TANKS - UNDERGROUND
ACCT: OTHER
RED ROCK
LOPEZ

PR-16000020-+ PROJECT: 10106
ASBESTOS
ACCT: OTHER
ARECIBO
ARECIBO
PR-160000209 PROJECT:
ASBESTOS
ACCT: OTHER
RAMEY
AGUADILLA
                      10103
PA
PA
PA
PA
PR
PR
                       6.9  ESDF
                      23.6  OTHR
                     200.0  OTHR
                      69.3  ESDF
                       5.0  OTHR
                                                         .4  OTHR
90/09 MEDIUM   SOLID    ADEQUATE  ADEQUATE   ADEQUATE
               WASTE     DESIGN    TIMING    ESTIMATE
                                          90/09  LOW
                                          90/09  LOW
                AIR     ADEQUATE  ADEQUATE   ADEQUATE
                         DESIGN    TIMING    ESTIMATE
                                                          AIR
                                          90/09 MEDIUM   SOLID
                                                         WASTE
                                          90/09 MEDIUM   SOLID
                                                         WASTE
                                          90/09 MEDIUM   SOLID
                                                         WASTE
                                                                  ADEQUATE  ADEQUATE   ADEQUATE
                                                                   DESIGN    TIMING    ESTIMATE
                        ADEQUATE  ADEQUATE    ADEQUATE
                         DESIGN    TIMING    ESTIMATE
                        ADEQUATE  ADEQUATE    ADEQUATE
                         DESIGN    TIMING     ESTIMATE
                        ADEQUATE  ADEQUATE    ADEQUATE
                         DESIGN    TIMING    ESTIMATE

-------
                                  FEDERAL AGENCY POLLUTION  ABATEMENT  PLAN FOR FISCAL YEAR 1991

                          DEPARTMENT OF LABOR                     DEPARTMENTOF LABOR
                 PROJECT IDENTIFICATION
                     REQ    EST    PROJECT
  BUDGET     COMPL   COMPL   COMPL  ASSESS- MEDIA
(THOUSANDS)   STATUS  DATE    DATE   MENT    TYPE
                                                                                                                      DOL-31
    ADEQUACY OF PROJECT
  ENGIN-
  EERING    TIME      COST
 PR-160000209 PROJECT:  10203
 FUEL TANKS - UNDERGROUND
 ACCT:  OTHER
 RAMEY
 AGUADILLA                        PR

 PR-160000212 PROJECT:  10113
 ASBESTOS
 ACCT:  OTHER
 BARRANQUITAS
 BARRANQUITAS                     PR

 SC-160000408 PROJECT:  10102
 ASBESTOS
 ACCT:  OTHER
 BAMBERG
 BAMBERG                           SC

 SD-160000806  PROJECT:  10102
 ASBESTOS
 ACCT:  OTHER
 BOXELDER
 NEMO                              SD

 TN-160000-+19  PROJECT:  10101
 ASBESTOS
 ACCT:  OTHER
 JACOBS CREEK
 BRISTOL                           TN

 TX-160000601  PROJECT:  10112
ASBESTOS
ACCT: OTHER
MC KINNEY
MC KINNEY                         TX
                                                        8.0   PSDF
        6.6   OTHR
        8.7  OTHR
       10.5   OTHR
        9.2   OTHR
       34.6  OTHR
                                                                           90/09 MEDIUM   WATER
                           90/09  MEDIUM   SOLID
                                         WASTE
                           90/09   LOW    MULTI
                                        MEDIA
                           90/09 MEDIUM  MULTI
                                        MEDIA
                           90/09   LOW    MULTI
                                        MEDIA
                           90/09 MEDIUM    AIR
                                                  ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
ADEQUATE  ADEQUATE   ADEQUATE
 DESIGN    TIMING    ESTIMATE
ADEQUATE  ADEQUATE   ADEQUATE
 DESIGN    TIMING    ESTIMATE
ADEQUATE  ADEQUATE   ADEQUATE
 DESIGN    TIMING    ESTIMATE
ADEQUATE  ADEQUATE   ADEQUATE
 DESIGN    TIMING    ESTIMATE
                                                  ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE

-------
                                 FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                         DEPARTMENT OF LABOR                     DEPARTMENTOF LABOR
                PROJECT IDENTIFICATION
                     REQ    EST   PROJECT
  BUDGET     COMPL   COMPL  COMPL ASSESS- MEDIA
(THOUSANDS)  STATUS  DATE   DATE  MENT    TYPE
                                                                     DOL-32
    ADEQUACY OF PROJECT
  ENGIN-
  EERING    TIME      COST
TX-160000601 PROJECT: 10212
FUEL TANKS - UNDERGROUND
ACCT: OTHER
MC KINNEY
MC KINNEY                        TX

TX-160000601 PROJECT: 10110
PCS
ACCT: OTHER
MC KINNEY
MC KINNEY                        TX

TX-160000601 PROJECT: 10104
ASBESTOS
ACCT: OTHER
EL PASO
EL PASO                          TX

TX-160000604 PROJECT: 10204
FUEL TANKS - UNDERGROUND
ACCT: OTHER
EL PASO
EL PASO                          TX

TX-160000606 PROJECT: 10105
ASBESTOS
ACCT: OTHER
GARY
SAN MARCOS                       TX

TX-160000606 PROJECT: 10104
ASBESTOS
ACCT: OTHER
GARY
SAN MARCOS                       TX
        5.7  ESDF   89/12  90/09  HIGH    SOLID     ADEQUATE   OVERDUE     ADEQUATE
                                          WASTE      DESIGN    TIMING     ESTIMATE
      101.8  ESDP   90/09  90/09  HIGH    TOXIC    ADEQUATE  OVERDUE    ADEQUATE
                                        SUBSTANCE    DESIGN   TIMING    ESTIMATE
       17.7  OTHR
                           90/09 MEDIUM    AIR
        0.8  ESDF   93/12  90/09 MEDIUM   SOLID
                                          WASTE
       83.0  ESDL
       69.6  OTHR
                           90/09 MEDIUM
                           90/09 MEDIUM
                                           AIR
                                           AIR
ADEQUATE  ADEQUATE   ADEQUATE
 DESIGN    TIMING    ESTIMATE
ADEQUATE  ADEQUATE   ADEQUATE
 DESIGN    TIMING    ESTIMATE
ADEQUATE  ADEQUATE   ADEQUATE
 DESIGN    TIMING    ESTIMATE
ADEQUATE  ADEQUATE   ADEQUATE
 DESIGN    TIMING    ESTIMATE

-------
                                  FEDERAL  AGENCY  POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                          DEPARTMENT OF  LABOR                     DEPARTMENTOF LABOR
                 PROJECT IDENTIFICATION
                                    REQ    EST   PROJECT
                 BUDGET     COMPL   COMPL  COMPL ASSESS- MEDIA
               (THOUSANDS)  STATUS  DATE   DATE  MENT    TYPE
                                                                                                                      DOL-33
    ADEQUACY OF PROJECT
  ENGIN-
  EERING    TIME      COST
 TX-160000606 PROJECT:  10204
 FUEL TANKS - UNDERGROUND
 ACCT: OTHER
 GARY
 SAN MARCOS

 TX-160000606 PROJECT:  10102
 PCB
 ACCT: OTHER
 GARY
 SAN MARCOS

 TX-160000610 PROJECT:  10102
 ASBESTOS
 ACCT:  OTHER
 LAREDO
 LAREDO

 TX-160000610 PROJECT:  10103
 SANITARY SEWERS
 ACCT:  OTHER
 LAREDO
 LAREDO

 UT-160000801  PROJECT:  10107
 ASBESTOS
 ACCT:  OTHER
 CLEARFIELD
 CLEARFIELD
UT-160000304 PROJECT:
ASBESTOS
ACCT: OTHER
WEBER BASIN
OGDEN
                      10103
TX
TX
TX
TX
                                 UT
UT
                      17.1  ESDF   93/12  90/09 MEDIUM   SOLID    ADEQUATE   ADEQUATE    ADEQUATE
                                                         WASTE     DESIGN    TIMING    ESTIMATE
                      24.0  ESDP   90/09  90/09  HIGH    TOXIC    ADEQUATE   OVERDUE     ADEQUATE
                                                       SUBSTANCE   DESIGN    TIMING     ESTIMATE
                       4.8  OTHR
                                          90/09 MEDIUM    AIR     ADEQUATE  ADEQUATE    ADEQUATE
                                                                   DESIGN    TIMING    ESTIMATE
                     164.0  ESRO   92/10  90/09 MEDIUM   WATER    ADEQUATE  ADEQUATE    ADEQUATE
                                                                   DESIGN    TIMING    ESTIMATE
                     415.0  OTHR
                                                       13.1  OTHR
                                          90/09 MEDIUM  MULTI
                                                        MEDIA
                                          90/09 MEDIUM  MULTI
                                                        MEDIA
ADEQUATE  ADEQUATE   ADEQUATE
 DESIGN    TIMING    ESTIMATE
ADEQUATE  ADEQUATE   ADEQUATE
 DESIGN    TIMING    ESTIMATE

-------
                                 FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                         DEPARTMENT OF LABOR                     DEPARTMENTOF LABOR
                PROJECT IDENTIFICATION
                     REQ    EST   PROJECT
  BUDGET     COMPL   COMPL  COMPL ASSESS- MEDIA
(THOUSANDS)  STATUS  DATE   DATE  MENT    TYPE
                                                                                                                      DOL-34
                            ADEQUACY OF PROJECT
                          ENGIN-
                          EERING    TIME      COST
VA-160000302 PROJECT: 10105
ASBESTOS
ACCT: OTHER
BLUE RIDGE
MARION                           VA

VA-160000311 PROJECT: 10105
ASBESTOS
ACCT: OTHER
OLD DOMINION
MONROE                           VA

VA-160000311 PROJECT: 10203
FUEL TANKS - UNDERGROUND
ACCT: OTHER
OLD DOMINION
MONROE                           VA

VA-160000313 PROJECT: 10103
ASBESTOS
ACCT: OTHER
FLATWOODS
COEBURN                          VA

VT-160000102 PROJECT: 10103
ASBESTOS
ACCT: OTHER
NORTHLANDS
VERGENNES                        VT

VT-160000102 PROJECT: 10209
FUEL TANKS - UNDERGROUND
ACCT: OTHER
NORTHLANDS
VERGENNES                        VT
        6.3  OTHR
       15.6  OTHR
       36.9  OTHR
        9.6  OTHR
       17.0  OTHR
      105.0  ESDF
90/09  LOW      AIR
                           90/09  LOW      AIR
                           90/09 MEDIUM  MULTI
                                         MEDIA
                           90/09  LOW      AIR
                           90/09  LOW     SOLID
                                          WASTE
                           90/09 MEDIUM    WATER
ADEQUATE  ADEQUATE   ADEQUATE
 DESIGN    TIMING    ESTIMATE
                        ADEQUATE  ADEQUATE
                         DESIGN    TIMING
                        ADEQUATE  ADEQUATE
                         DESIGN    TIMING
                                                   ADEQUATE  ADEQUATE
                                                    DESIGN    TIMING
                          NOT
                         AVAIL
                                                     NOT
                                                    AVAIL
            NOT
           AVAIL
                                    NOT
                                   AVAIL
                                                                       ADEQUATE
                                                                       ESTIMATE
                     ADEQUATE
                     ESTIMATE
                                             ADEQUATE
                                             ESTIMATE
 NOT
AVAIL
                       NOT
                      AVAIL

-------
                                  FEDERAL AGENCY  POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                          DEPARTMENT OF  LABOR                     DEPARTMENTOF LABOR
                 PROJECT IDENTIFICATION
                     REQ     EST    PROJECT
  BUDGET     COMPL   COMPL   COMPL  ASSESS- MEDIA
(THOUSANDS)   STATUS   DATE    DATE   MENT    TYPE
                                                                                                                      DOL-35
                            ADEQUACY  OF  PROJECT
                          ENGIN-
                          EERING    TIME      COST
 WA-160001003 PROJECT:  10102
 ASBESTOS
 ACCT:  OTHER
 CASCADES
 SEDRO  WOOLLEY                    HA

 WA-160001003 PROJECT:  10204
 FUEL TANKS - UNDERGROUND
 ACCT:  OTHER
 CASCADES
 SEDRO  WOOLLEY                    WA

 WA-160001004 PROJECT:  10101
 ASBESTOS
 ACCT:  OTHER
 COLUMBIA BASIN
 MOSES  LAKE                        WA

 WA-160001005 PROJECT:  10103
 ASBESTOS
 ACCT:  OTHER
 FORT SIMCOE
 WHITE  SWAN                        WA

 WA-160001009  PROJECT:  10103
 ASBESTOS
 ACCT:  OTHER
 CURLEW
 WAUCONDA                         WA

WI-160000510  PROJECT:  1010Z
ASBESTOS
ACCT: OTHER
BLACKWELL
 LAONA                            WI
                                                        18.7  OTHR
         .*   OTHR
       14.3  OTHR
       11.7   OTHR
       10.1   OTHR
            OTHR
                                                                           90/09 MEDIUM
                           90/09 MEDIUM
                           90/09 MEDIUM
                                        MULT I
                                        MEDIA
                                        MULTI
                                        MEDIA
              MULTI
              MEDIA
90/09 MEDIUM  MULTI
              MEDIA
                           90/09 MEDIUM  MULTI
                                        MEDIA
                          90/09 MEDIUM  MULTI
                                        MEDIA
                        ADEQUATE   ADEQUATE    ADEQUATE
                         DESIGN     TIMING     ESTIMATE
                        ADEQUATE   ADEQUATE    ADEQUATE
                         DESIGN    TIMING     ESTIMATE
ADEQUATE  ADEQUATE   ADEQUATE
 DESIGN    TIMING    ESTIMATE
ADEQUATE  ADEQUATE   ADEQUATE
 DESIGN    TIMING    ESTIMATE
                        ADEQUATE   ADEQUATE    ADEQUATE
                         DESIGN    TIMING    ESTIMATE
                        ADEQUATE   ADEQUATE    ADEQUATE
                         DESIGN    TIMING    ESTIMATE

-------
                                 FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                         DEPARTMENT OF LABOR                     DEPARTMENTOF LABOR
                PROJECT IDENTIFICATION
WV-160000303 PROJECT: 10104
ASBESTOS
ACCT: OTHER
CHARLESTON
CHARLESTON
WV
WV-160000312 PROJECT: 10106
ASBESTOS
ACCT: OTHER
HARPERS FERRY
HARPERS FERRY                    WV

*     TOTAL, DEPARTMENTOF LABOR
      TOTAL, DEPARTMENT OF LABOR
                                    REQ    EST   PROJECT
                 BUDGET  '   COMPL   COMPL  COMPL ASSESS- MEDIA
               (THOUSANDS)  STATUS  DATE   DATE  MENT    TYPE
                      12.7  OTHR
                       9.3  OTHR
                             11,397.6


                             11,397.6
90/09  LOW      AIR





90/09  LOW      AIR





                176


                176
                                                                                     DOL-36
                            ADEQUACY OF PROJECT
                          ENGIN-
                          EERING    TIME      COST
ADEQUATE  ADEQUATE   ADEQUATE
 DESIGN    TIMING    ESTIMATE
ADEQUATE  ADEQUATE   ADEQUATE
 DESIGN    TIMING    ESTIMATE

-------
VA

-------
 DEPARTMENT OF
VETERANS AFFAIRS

-------
                                                       VA-1
THE DEPARTMENT OF VETERANS AFFAIRS

The Department of Veterans Affairs, formally the Veterans
Administration (VA),  includes 326 installations, and occupies
26,026 acres of land. It also owns 4,821 buildings which contain
120,959,000 square feet of floor area.  VA has the second largest
number of square feet of floor space of any civilian agency.
AGENCY POLLUTION ABATEMENT PLAN FOR FY 1991

VA proposed 203 projects, totalling $55.9 million in their FY
1991 environmental plan.

EPA evaluated each project included in the VA plan, and
categorized them according to the potential impact on the local
environment if the projects are not funded in FY 1991. EPA rated
one project as having a "High" environmental impact (budgeted at
$57,000).  "Medium" ratings were assigned to 199 projects ($55.1
million) and 2 projects were rated as having a "Low" impact
($540,000).

The distribution of projects among compliance classes for VA
indicates that there is one Class I project, in the plan for
current compliance reasons.  The 140 Class II projects, or 69
percent of the total, include those necessary to permit the
agency to meet near-term compliance deadlines. There are 62 Class
III projects in the plan which make up 30 percent of the total.

The projects proposed by the VA in their FY 1991 plan are
distributed across the various environmental media programs in
the following pattern: 137 air projects, costing $44.4 million; 2
drinking water projects costing a total of $234,000; 1 noise
project costing $35,000; 6 RCRA projects costing $783,000; 18
projects in the toxics area, costing $3.2 million and 39 water
projects costing $7.2 million.

-------
                                                                                        VA-2
                      TOTAL NUMBER AND DOLLARS PROPOSED FOR
                       POLLUTION ABATEMENT NEEDS FOR FY 1991
                              DEPT OF VETERANS AFFAIRS
                                                           55865.3
         1 00
                          - 1
                          1000
VA FIG 1
        10000


NUMBER of PROJECTS

DOLLARS REQUESTED ($000)
100000
1000000

-------
                                                                                       VA-3
                        TOTAL NUMBER AND DOLLARS PROPOSED FOR
                         CLASS I, II, III PROJECTS FOR FY 1991
                              DEPT OF VETERANS AFFAIRS
       CLASS I
       CLASS
      CLASS
I 	 1 	
10
	 1 	
100
	 1 	
1000
10000
	 1 	
100000
1000000
VA FIG 2
PROJECTS
DOLLARS ($000)

-------
                                                                                   VA-4
   VA   - TABLE 1: EPA EVALUATION OF THE ENVIRONMENTAL IMPACT OF PROPOSED
                   POLLUTION ABATEMENT PROJECTS FOR FISCAL YEAR 1991
                   INCLUDING NUMBER AND COST
                         DEPARTMENT OF VETERANS AFFAIRS
COMPLIANCE *
STATUS

ESDP
ESDF
PSDF
ESRO
OTHR
GRAND TOTAL
HIGH
PROJECTS
COST
($1,000)
1
57.0
0
0.0
0
0.0
0
0.0
0
0.0
1
57.0
MEDIUM
PROJECTS
COST
($1,000)
0
0.0
137
39,090.7
1
76.0
1
87.0
61
16,014.6
200
55,268.3
LOW
PROJECTS
COST
($1,000)
0
0.0
2
540.0
0
0.0
0
0.0
0
0.0
2
540.0
TOTAL
PROJECTS
COST
($1,000)
1
57.0
139
39,630.7
1
76.0
1
87.0
61
16,014.6
203
55,865.3
*  SEE SECTION III FOR  DEFINITIONS OF COMPLIANCE STATUS CATEGORIES

-------
     VA    -   TABLE  2:   NUMBER  AND  DOLLAR  AMOUNT OF  POLLUTION  ABATEMENT PROJECTS FOR FEDERAL INSTALLATIONS
                        PROPOSED  BY MAJOR  COMMAND/BUREAU  FOR FISCAL YEAR  1991 BY CLASS/COMPLIANCE STATUS.*

                                        DEPARTMENT OF  VETERANS AFFAIRS
                                                                                                                        VA-5
MAJOR COMMAND/
BUREAU

VETERANS
ADMIN
TOTAL
CMPA
PROJECTS
COST
($1,000)


CLASS I
INOV
PROJECTS
COST
($1,000)


	
ESDP
PROJECTS
COST
($1,000)
1
57.0
1
57.0
CLASS
ESDF
PROJECTS
COST
($1,000)
	
139
39,630.7
139
39,630.7
	
II
PSDF
_ _
PROJECTS
COST
($1,000)
1
76.0
1
76.0
ESRO
PROJECTS
COST
( $1,000)
1
57.0
1
87.0
CLASS
ESRE
PROJECTS
COST
($1,000)


III
ESDL
PROJECTS
COST
($1,000)


	
OTHR
PROJECTS
COST
($1,000)
61
16,014.6
61
16,014.6
TOTAL
PROJECTS
COST
($1,000)
203
55,865.3
203
55,865.3
SEE SECTION III FOR DEFINITIONS OF COMPLIANCE STATUS CATEGORIES

-------
                                                                                                       VA-6
VA   - TABLE 3: NUMBER AND DOLLAR AMOUNT OF POLLUTION ABATEMENT PROJECTS PROPOSED BY
                MAJOR COMMAND/BUREAU AND ENVIRONMENTAL MEDIA FOR FISCAL YEAR 1991

                                DEPARTMENT OF VETERANS AFFAIRS
MAJOR COMMAND/
BUREAU AIR

VETERANS
ADMIN
TOTAL
PROJECTS
COST
($1,000)
137
44399.3
137
44399.3
DRINKING
MATER
PROJECTS
COST
($1,000)
2
234.0
2
234.0
NOISE
PROJECTS
COST
($1,000)
1
35.0
1
35.0
PESTICIDES RADIATION CERCLA RCRA
PROJECTS PROJECTS PROJECTS PROJECTS
COST COST COST COST
($1,000) ($1,000) ($1,000) ($1,000)
6
783.0
6
783.0
TSCA
PROJECTS
COST
($1,000)
18
3175.9
IS
3175.9
WATER
PROJECTS
COST
($1,000)
39
7238.1
39
7238.1
MULT I TOTAL
PROJECTS PROJECTS
COST COST
($1,000) ($1,000)
203
55865.3
203
55865.3

-------
                                 FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR  FISCAL YEAR  1991

                         VETERANS ADMINISTRATION                 VETERANS ADMINISTRATION
                PROJECT IDENTIFICATION
                    REQ    EST   PROJECT
  BUDGET     COMPL   COMPL  COMPL ASSESS- MEDIA
(THOUSANDS)   STATUS  DATE   DATE  MENT    TYPE
                                                                                                                     VA-7
                           ADEQUACY OF PROJECT
                          ENGIN-
                          EERING    TIME      COST
AL-360010343 PROJECT: 679911030
REPR QRTRS. 6A 4 B  (ASBESTOS)
ACCT: OTHER
VA MEDICAL CENTER
TUSCALOOSA                       AL

AL-360010344 PROJECT: 680891010
ASBESTOS EXPOSURE ASSESSMENT
ACCT: OTHER
VA MEDICAL CENTER
TUSKEGEE                         AL

AR-360010268 PROJECT: 565881040
REMOVE ASBESTOS
ACCT: OTHER
VA MEDICAL CENTER
FAYETTEVILLE                     AR

AR-360010297 PROJECT: 598881220
ASBESTOS ASSESSMENT
ACCT: OTHER
VA MEDICAL CENTER
LITTLE ROCK                      AR

AR-360010297 PROJECT: 598901180
REMOVE ASBESTOS MAT'L (PH2)
ACCT: OTHER
VA MEDICAL CENTER
LITTLE ROCK                      AR

AR-360010297 PROJECT: 598841150
REPL STORM DRAINS
ACCT: OTHER
VA MEDICAL CENTER
LITTLE ROCK                      AR
      217.0   ESDF
       80.0   ESDF
      106.0   ESDF
      235.0   ESDF
      259.0   ESDF
      400.0   OTHR
                          90/09 MEDIUM    AIR
                          90/09 MEDIUM    AIR
90/09 MEDIUM    AIR
                          90/09 MEDIUM    AIR
                           90/09 MEDIUM    AIR
                           90/09 MEDIUM   WATER
                         NOT
                        AVAIL
                         NOT
                         AVAIL
 NOT
AVAIL
                          NOT
                         AVAIL
                          NOT
                         AVAIL
                                                    NOT
                                                   AVAIL
           NOT
          AVAIL
           NOT
          AVAIL
 NOT
AVAIL
           NOT
          AVAIL
           NOT
          AVAIL
                                    NOT
                                   AVAIL
            NOT
           AVAIL
            NOT
           AVAIL
 NOT
AVAIL
            NOT
           AVAIL
            NOT
           AVAIL
                      NOT
                     AVAIL

-------
                                 FEDERAL ASENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                         VETERANS ADMINISTRATION                 VETERANS ADMINISTRATION
                PROJECT IDENTIFICATION
                     REQ    EST   PROJECT
  BUDGET     COMPL   COMPL  COMPL  ASSESS- MEDIA
(THOUSANDS)  STATUS  DATE    DATE   MENT    TYPE
                                                                                                                     VA-8
  ADEQUACY OF PROJECT
ENGIN-
EERING    TIME      COST
AZ-360007309 PROJECT: 644891010
ASBESTOS ASSESSMENT
ACCT: OTHER
V A HOSPITAL
PHOENIX                          AZ

AZ-360007309 PROJECT: 644881130
ASBESTOS REMOVAL
ACCT: OTHER
V A HOSPITAL
PHOENIX                          AZ

AZ-360007309 PROJECT: 644871160
REMOVE TRANSFORMER PCB'S
ACCT: OTHER
V A HOSPITAL
PHOENIX                          AZ

AZ-360007309 PROJECT: 644831140
REPLACE SANITARY SEWER
ACCT: OTHER
V A HOSPITAL
PHOENIX                          AZ

AZ-360010351 PROJECT: 649S81080
ASBESTOS ASSESSMENT
ACCT: OTHER
VA MEDICAL CENTER
PRESCOTT                         AZ

AZ-360010351 PROJECT: 649901020
ASBESTOS PIPE REMOVAL
ACCT: OTHER
VA MEDICAL CENTER
PRESCOTT                         AZ
       95.0  ESDF
      162.0  ESDF
       88.0  ESDF
       17.0  ESDF
       39.5  ESDF
      228.0  ESDF
                           90/09 MEDIUM    AIR     ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
                           90/09  MEDIUM    AIR     ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
                           90/09 MEDIUM   TOXIC    ADEQUATE  ADEQUATE   ADEQUATE
                                       SUBSTANCE   DESIGN    TIMING    ESTIMATE
                           90/09 MEDIUM   WATER    ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
                           90/09 MEDIUM    AIR     ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
                           90/09 MEDIUM    AIR     ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE

-------
                                  FEDERAL  AGENCY  POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                          VETERANS ADMINISTRATION                VETERANS ADMINISTRATION
                 PROJECT  IDENTIFICATION
                     REQ     EST   PROJECT
  BUDGET     COMPL    COMPL   COMPL ASSESS- MEDIA
(THOUSANDS)   STATUS   DATE    DATE  MENT    TYPE
                                                                                                                     VA-9
    ADEQUACY OF PROJECT
  ENGIN-
  EERING    TIME      COST
CA-360007296  PROJECT: 600871030
CORR VENT DEF  LAB
ACCT: OTHER
VA MEDICAL CENTER
LONG BEACH                       CA

CA-360007296  PROJECT: 600871100
ASB ELIM PH 3
ACCT: OTHER
VA MEDICAL CENTER
LONG BEACH                       CA

CA-360010277 PROJECT: 570891070
ASBESTOS ASSESSMENT
ACCT: OTHER
VA MEDICAL CENTER
FRESNO                           CA

CA-360010720 PROJECT: 640881060
INCR. FUME HOODS AIR FLOW
ACCT: OTHER
VA MHDICAL CENTER
PALO ALTO                        CA

CA-360010720 PROJECT: 640871010
REPL. UNDERGROUND HAZ. FUEL STOR.
ACCT: OTHER
VA MEDICAL CENTER
PALO ALTO                        CA

CA-360010720 PROJECT: 6408811-+0
REPL. SEWER LINES
ACCT: OTHER
VA MEDICAL CENTER
PALO ALTO                        CA
      118.0  ESDF
      365.0  ESDF
       75.0   ESDF
       93,0   ESDF
      397.0   ESDF
      338.0   ESDF
                           90/09 MEDIUM    AIR
                           90/09 MEDIUM    AIR
                           90/09 MEDIUM    AIR
                           90/09  MEDIUM    AIR
                           90/09 MEDIUM   WATER
                           90/09  MEDIUM   WATER
ADEQUATE  ADEQUATE
 DESIGN    TIMING
ADEQUATE
ESTIMATE
ADEQUATE  ADEQUATE   ADEQUATE
 DESIGN    TIMING    ESTIMATE
ADEQUATE  ADEQUATE   ADEQUATE
 DESIGN    TIMING    ESTIMATE
ADEQUATE  ADEQUATE   ADEQUATE
 DESIGN    TIMING    ESTIMATE
ADEQUATE  ADEQUATE   ADEQUATE
 DESIGN    TIMING    ESTIMATE
ADEQUATE  ADEQUATE   ADEQUATE
 DESIGN    TIMING    ESTIMATE

-------
                                 FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                         VETERANS ADMINISTRATION                 VETERANS ADMINISTRATION
                PROJECT IDENTIFICATION
                     REQ    EST   PROJECT
  BUDGET     COMPL   COMPL  COMPL ASSESS- MEDIA
(THOUSANDS)   STATUS  DATE   DATE   MENT    TYPE
                                                                     VA-10
                            ADEQUACY OF PROJECT
                          ENGIN-
                          EERING    TIME      COST
CA-360010720 PROJECT: 640881660
REMOVE SEWER OBSTRUCTIONS
ACCT: OTHER
VA MEDICAL CENTER
PALO ALTO                        CA

CA-360030032 PROJECT: 691891080
ASBESTOS ABATEMENT B 114 ft 295
ACCT: OTHER
VA MEDICAL CENTER
WEST LOS ANGELES                 CA

CO-360010272 PROJECT: 567881110
REPLACE PATHOLOGICAL INCINERATOR
ACCT: OTHER
VA MEDICAL CENTER
FT LYON                          CO

CO-360010272 PROJECT: 567891010
ASBESTOS ASSESSMENT
ACCT: OTHER
VA MEDICAL CENTER
FT LYON                          CO

CO-360010272 PROJECT: 567901120
SEWER PLANT DRYING BEDS
ACCT: OTHER
VA MEDICAL CENTER
FT LYON                          CO

CO-360010279 PROJECT: 575901120
ASBESTOS REMOVAL PHASE 5
ACCT: OTHER
VA MEDICAL CENTER
GRAND JUNCTION                   CO
       30.0  ESDF
       57.0   ESDP
       45.0   ESDF
       80.3  ESDF
       75.0   ESDF
       90.0   ESDF
                           90/09  MEDIUM   WATER
                           90/09  HIGH     AIR
                           90/09 MEDIUM    AIR
                           90/09 MEDIUM    AIR
90/09 MEDIUM   WATER
                          90/09  LOW      AIR
                                                  ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
                        ADEQUATE  ADEQUATE
                         DESIGN    TIMING
                                                    NOT
                                                   AVAIL
                                                    NOT
                                                   AVAIL
                                                    NOT
                                                   AVAIL
                                                    NOT
                                                   AVAIL
                                    NOT
                                   AVAIL
                                   NOT
                                   AVAIL
                                   NOT
                                  AVAIL
                                   NOT
                                  AVAIL
                                                                       ADEQUATE
                                                                       ESTIMATE
 NOT
AVAIL
 NOT
AVAIL
 NOT
AVAIL
 NOT
AVAIL

-------
                                 FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR  FISCAL YEAR  1991

                         VETERANS ADMINISTRATION                 VETERANS ADMINISTRATION
                PROJECT IDENTIFICATION
                           EST   PROJECT
  BUDGET     COMPL   COMPL  COMPL ASSESS- MEDIA
(THOUSANDS)   STATUS  DATE   DATE  MENT    TYPE
                                                                                                                     VA-11
   ADEQUACY OF PROJECT
 ENGIN-
 EERING    TIME      COST
CT-3600103-+9 PROJECT: 68990116
ASBESTOS FLOORING REPLACEMENT
ACCT: OTHER
VA MEDICAL CENTER
WEST HAVEN                       CT

CT-360010349 PROJECT: 689901170
INCINERATOR REPLACEMENT
ACCT: OTHER
VA MEDICAL CENTER
WEST HAVEN                       CT

CT-360010349 PROJECT: 68990112
ASBESTOS ABATEMENT PH 1
ACCT: OTHER
VA MEDICAL CENTER
WEST HAVEN                       CT

CT-360010349 PROJECT: 689871110
REPAIR INCINERATOR (RETROFIT)
ACCT: OTHER
VA MEDICAL CENTER
WEST HAVEN                       CT

CT-360010349 PROJECT: 68990110
FUEL TANK REPLACEMENT
ACCT: OTHER
VA MEDICAL CENTER
WEST HAVEN                       CT

CT-360010386 PROJECT: 627891020
ASBESTOS ASSESSMENT
ACCT: OTHER
VA MEDICAL CENTER
NEWINGTON                        CT
      450.0   ESDF
    1,192.0   ESDF
      <+80.0   ESDF
      212.0   ESDF
      492.0   ESDF
       50.0   ESDF
                          90/09  LOW      AIR
                          90/09 MEDIUM    AIR
                          90/09 MEDIUM    AIR
                          90/09 MEDIUM    AIR
                           90/09 MEDIUM   WATER
                          90/09 MEDIUM    AIR
 NOT
AVAIL
 NOT
AVAIL
 NOT
AVAIL
 NOT
AVAIL
 NOT
AVAIL
 NOT
AVAIL
 NOT
AVAIL
 NOT
AVAIL
 NOT
AVAIL
 NOT
AVAIL
 NOT
AVAIL
 NOT
AVAIL
 NOT
AVAIL
 NOT
AVAIL
 NOT
AVAIL
 NOT
AVAIL
 NOT
AVAIL
 NOT
AVAIL

-------
                                 FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR  1991

                         VETERANS ADMINISTRATION                 VETERANS ADMINISTRATION
                PROJECT IDENTIFICATION
                     REQ    EST    PROJECT
  BUDGET     COMPL   COMPL  COMPL  ASSESS- MEDIA
(THOUSANDS)   STATUS  DATE    DATE   MENT    TYPE
                                                                     VA-12
                            ADEQUACY  OF  PROJECT
                          ENGIN-
                          EERING   TIME      COST
CT-3600103S6 PROJECT: 627871040
ETO VENT SYSTEM
ACCT: OTHER
VA MEDICAL CENTER
NEWINGTON                        CT

CT-360010386 PROJECT: 627891010
EMERGENCY ASBESTOS REMOVAL
ACCT: OTHER
VA MEDICAL CENTER
NEWINGTON                        CT

CT-360010386 PROJECT: 627901020
REPLACE UNDERGROUND FUEL TANKS
ACCT: OTHER
VA MEDICAL CENTER
NEWINGTON                        CT

CT-360010386 PROJECT: 62788102
REPL. UNDR. FUEL TNKS
ACCT: OTHER
VA MEDICAL CENTER
NEWINGTON                        CT

DC-360010402 PROJECT: 688901110
ASBESTOS REMOVAL
ACCT: OTHER
VA MEDICAL CENTER
WASHINGTON                       DC

DC-360010402 PROJECT: 688891100
ASBESTOS ASSESSMENT
ACCT: OTHER
VA MEDICAL CENTER
WASHINGTON                       DC
      115.6  ESDF
      375.0   OTHR
      305.0   ESDF
      305.0   ESDF
       55.7  ESDF
      116.3  ESDF
                           90/09 MEDIUM    AIR
90/09 MEDIUM    AIR
                           90/09 MEDIUM   WATER
                           90/09 MEDIUM   WATER
                          90/09 MEDIUM    AIR
                          90/09 MEDIUM    AIR
                                                    NOT
                                                   AVAIL
                                                    NOT
                                                   AVAIL
                                                    NOT
                                                   AVAIL
                                                    NOT
                                                   AVAIL
                         NOT
                        AVAIL
                                                    NOT
                                                   AVAIL
                                    NOT
                                   AVAIL
                                   NOT
                                   AVAIL
                                   NOT
                                  AVAIL
                                   NOT
                                  AVAIL
                                                              NOT
                                                             AVAIL
                                   NOT
                                  AVAIL
 NOT
AVAIL
 NOT
AVAIL
 NOT
AVAIL
 NOT
AVAIL
 NOT
AVAIL
 NOT
AVAIL

-------
                                 FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR  FISCAL  YEAR  1991

                         VETERANS ADMINISTRATION                 VETERANS ADMINISTRATION
                PROJECT IDENTIFICATION
                    REQ    EST   PROJECT
  BUDGET     COMPL   COMPL  COMPL ASSESS- MEDIA
(THOUSANDS)   STATUS  DATE   DATE  MENT    TYPE
                                                                                                                     VA-13
   ADEQUACY OF  PROJECT
 ENGIN-
 EERING    TIME      COST
FL-360007275 PROJECT: 516891010
ASBESTOS SURVEY
ACCT: OTHER
VA MEDICAL CENTER
BAY PINES                        FL

FL-360013969 PROJECT: 546871130
HAZARDOUS MATERIAL STORAGE
ACCT: OTHER
VA MEDICAL CENTER
MIAMI                            FL

FL-360015449 PROJECT: 573881130
INCINERATOR BOX SHREDDER
ACCT: OTHER
VA MEDICAL CENTER
GAINESVILLE                      FL

FL-360015449 PROJECT: 573891010
ASBESTOS ASSESSMENT
ACCT: OTHER
VA MEDICAL CENTER
GAINESVILLE                      FL

FL-360020009 PROJECT: 673881020
REMOVE ASBESTOS WARDS PH 3
ACCT: OTHER
VA MEDICAL CENTER
TAMPA                            FL

FL-360020009 PROJECT: 673881050A
ASBESTOS EXPOSURE ASSESSMENT
ACCT: OTHER
VA MEDICAL CENTER
TAMPA                            FL
       21.0   OTHR
       52.0   OTHR
       68.0   ESDF
       58.0   OTHR
      759.0   ESDF
       50.0   ESDF
                          90/09 MEDIUM    AIR
                          90/09 MEDIUM   WATER
                          90/09 MEDIUM    AIR
                          90/09 MEDIUM    AIR
                          90/09 MEDIUM    AIR
                          90/09 MEDIUM    AIR
 NOT
AVAIL
 NOT
AVAIL
 NOT
AVAIL
 NOT
AVAIL
 NOT
AVAIL
 NOT
AVAIL
 NOT
AVAIL
 NOT
AVAIL
 NOT
AVAIL
 NOT
AVAIL
 NOT
AVAIL
 NOT
AVAIL
 NOT
AVAIL
 NOT
AVAIL
 NOT
AVAIL
 NOT
AVAIL
 NOT
AVAIL
 NOT
AVAIL

-------
                                 FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR  1991

                         VETERANS ADMINISTRATION                 VETERANS ADMINISTRATION
                PROJECT IDENTIFICATION
                     REQ    EST   PROJECT
  BUDGET     COMPL   COMPL  COMPL  ASSESS- MEDIA
(THOUSANDS)  STATUS  DATE   DATE   MENT    TYPE
                                                                     VA-14
  ADEQUACY OF PROJECT
ENGIN-
EERING    TIME      COST
FL-360020009 PROJECT: 673881050
REMOVE ASB. REINSUL. BOILERS ETC.
ACCT: OTHER
VA MEDICAL CENTER
TAMPA                            FL

GA-360010241 PROJECT: 509851230A
ASBESTOS REMOVAL UD
ACCT: OTHER
VA MEDICAL CENTER
AUGUSTA                          GA

GA-360010264 PROJECT: 557881140
ASBESTOS EXPOSURE ASSESSMENT
ACCT: OTHER
CARL VINSON VA MEDICAL CENTER
DUBLIN                           GA

IA-360007292 PROJECT: 592891010
COMPLETE UPDATED ASBESTOS ASSESSMENT
ACCT: OTHER
VA MEDICAL CENTER
KNOXVILLE                        IA

IA-360007292 PROJECT: 592901040
ASBESTOS REMOVAL PHASE 3
ACCT: OTHER
VA MEDICAL CENTER
KNOXVILLE                        IA

IA-360007292 PROJECT: 592881090
WATER DISTRIBUTION STUDY
ACCT: OTHER
VA MEDICAL CENTER
KHOXVILLE                        IA
      513.0  ESDF
      235.0  ESDF
       59.0  ESDF
       69.0  ESDF
      520.0  ESDF
       45.0  ESDF
                           90/09 MEDIUM     AIR
                           90/09  MEDIUM    AIR
                           90/09  MEDIUM    AIR
                           90/09 MEDIUM
                           90/09 MEDIUM
                                          AIR
                                          AIR
                                                    NOT       NOT
                                                   AVAIL     AVAIL
                                                    NOT       NOT
                                                   AVAIL     AVAIL
                                                    NOT
                                                   AVAIL
                                                    NOT
                                                   AVAIL
                                                    NOT
                                                   AVAIL
          NOT
         AVAIL
          NOT
         AVAIL
          NOT
         AVAIL
                           90/09 MEDIUM  DRINKING    NOT       NOT
                                         WATER     AVAIL     AVAIL
                     NOT
                    AVAIL
                     NOT
                    AVAIL
 NOT
AVAIL
 NOT
AVAIL
 NOT
AVAIL
                    NOT
                   AVAIL

-------
                                 FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR  1991

                         VETERANS ADMINISTRATION                 VETERANS ADMINISTRATION
                 PROJECT IDENTIFICATION
                                    REQ    EST   PROJECT
                 BUDGET     COMPL   COMPL  COMPL  ASSESS- MEDIA
               (THOUSANDS)  STATUS  DATE    DATE   MENT    TYPE
                                                                                                                     VA-15
   ADEQUACY OF PROJECT
 ENGIN-
 EERING    TIME      COST
IA-360010283 PROJECT: 584871060
REPL W  L ASBES INSUL
ACCT: OTHER
VA MEDICAL CENTER
IOWA CITY                        IA

IA-360010286 PROJECT: 584871180
CLINICAL ADD. ASBES. ABATEMENT
ACCT: OTHER
VA MEDICAL CENTER
IOWA CITY                        IA
IA-360010288 PROJECT: 584881150
REMOVE ASBESTOS B 3
ACCT: OTHER
VA MEDICAL CENTER
IOWA CITY
IA-360010288 PROJECT: 584901020
ASBESTOS ABATEMENT
ACCT: OTHER
VA MEDICAL CENTER
IOWA CITY

IA-360010288 PROJECT: 584871110
INST TRASH COMPACTOR
ACCT: OTHER
VA MEDICAL CENTER
IOWA CITY
                                 IA
IA
                                 IA
10-360010245 PROJECT: 531891120
UPDATE ASBESTOS SURVEY
ACCT: OTHER
VA MEDICAL CENTER
BOISE                            ID
                   1,032.0  ESDF
                      30.0  ESDF
                                                      275.0  ESDF
                                                      450.0  ESDF
                     125.0  ESDF
                                                       22.0  ESDF
                                          90/09  MEDIUM
                                          90/09  MEDIUM
                                                                           90/09 MEDIUM
                                                                           90/09 MEDIUM
                                                         AIR
                                                         AIR
                                                                                           AIR
                                                                                           AIR
                                          90/09  MEDIUM   WATER
 NOT
AVAIL
                                                                   NOT
                                                                  AVAIL
                                                                   NOT
                                                                  AVAIL
                                                                   NOT
                                                                  AVAIL
                                                                   NOT
                                                                  AVAIL
 NOT
AVAIL
           NOT
          AVAIL
           NOT
          AVAIL
           NOT
          AVAIL
           NOT
          AVAIL
 NOT
AVAIL
            NOT
           AVAIL
            NOT
           AVAIL
            NOT
           AVAIL
            NOT
           AVAIL
                                                                           90/09 MEDIUM
                                                                                           AIR
                                                                 ADEQUATE  ADEQUATE   ADEQUATE
                                                                  DESIGN    TIMING    ESTIMATE

-------
                                 FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                         VETERANS ADMINISTRATION                 VETERANS ADMINISTRATION
                PROJECT IDENTIFICATION
                     REG)    EST   PROJECT
  BUDGET     COMPL   COMPL  COMPL  ASSESS-  MEDIA
(THOUSANDS)   STATUS  DATE    DATE   MENT     TYPE
                                                                                                                      VA-16
   ADEQUACY OF PROJECT
 ENGIN-
 EERING    TIME      COST
ID-360010245 PROJECT: 531901160
ASBESTOS PIPE INSULATION PH 1
ACCT: OTHER
VA MEDICAL CENTER
BOISE                            ID

ID-360010245 PROJECT: 531881020
REPL. SAN. SEHER MAIN A/E
ACCT: OTHER
VA MEDICAL CENTER
BOISE                            ID

IL-360007283 PROJECT: 53B891010
VALMC ASBESTOS SURVEY
ACCT: OTHER
VA MEDICAL CENTER_(LAKESIDE )
CHICAGO                          IL

IL-360007283 PROJECT: 535901110
VALMC ASBESTOS SURVEY
ACCT: OTHER
VA MEDICAL CENTER_tLAKESIDE )
CHICAGO                          IL

IL-360007283 PROJECT: 535901050
REPLACE FUEL OIL TANKS
ACCT: OTHER
VA MEDICAL CENTER_(LAKESIDE )
CHICAGO                          IL

IL-360007300 PROJECT: 609871040
REPLACE PCB TRANSFORMERS
ACCT: OTHER
V A M C MARION
MARION                           IL
      145.0  ESDF
       15.0  ESDF
      330.0   ESDF
      330.0   ESDF
             ESDF
      213.2   ESDF
                           90/09  MEDIUM
                                          AIR
                                                  ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
                           90/09  MEDIUM   WATER
                                                  ADEQUATE  ADEQUATE
                                                   DESIGN    TIMING
                           90/09 MEDIUM
                           90/09 MEDIUM
                                          AIR
                                          AIR
                           90/09 MEDIUM   WATER
                           90/09 MEDIUM   TOXIC
                                       SUBSTANCE
                                                    NOT
                                                   AVAIL
                                                    NOT
                                                   AVAIL
                                                    NOT
                                                   AVAIL
 NOT
AVAIL
           NOT
          AVAIL
           NOT
          AVAIL
           NOT
          AVAIL
 NOT
AVAIL
                    ADEQUATE
                    ESTIMATE
            NOT
           AVAIL
            NOT
           AVAIL
            NOT
           AVAIL
 NOT
AVAIL

-------
                                 FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR  FISCAL YEAR  1991

                         VETERANS ADMINISTRATION                 VETERANS ADMINISTRATION
                PROJECT IDENTIFICATION
                    RE<3    EST   PROJECT
  BUDGET     COMPL   COMPL  COMPL ASSESS- MEDIA
(THOUSANDS)   STATUS  DATE   DATE  MENT    TYPE
                                                                                                                     VA-17
                           ADEQUACY OF PROJECT
                          ENGIN-
                          EERING    TIME      COST
IL-360010253 PROJECT: 537891110
ASBESTOS SURVEY
ACCT: OTHER
VA MEDICAL CENTER (WESTSIDE)
CHICAGE                          IL

IL-360010263 PROJECT: 609901040
ASBESTOS SURVEY 4 MGT PLAN
ACCT: OTHER
V A M C NORTH CHICAGO (DOWNEY)
CHICAGO                          IL

IL-360010263 PROJECT: 556881250
ASBESTOS REMOVAL PIPE BASEMENTS
ACCT: OTHER
V A M C NORTH CHICAGO (DOWNEY)
CHICAGO                          IL

IL-360010263 PROJECT: WHAT-1
COMPLETE ASBESTOS REMOVAL
ACCT: OTHER
V A M C NORTH CHICAGO (DOWNEY)
CHICAGO                          IL

IL-360010263 PROJECT: 556881030
PCB TRANSFORMER REMOVAL PHASE 1
ACCT: OTHER
V A M C NORTH CHICAGO (DOWNEY)
CHICAGO                          IL

IL-360010372 PROJECT: 550901040
REPLACE BOILERS & INCINERATORS
ACCT: OTHER
V A M C DANVILLE
DANVILLE                         IL
      179.0   ESDF
       95.0   ESDF
      408.0   ESDF
      986.0   ESDF
      527.0   ESDF
    1,422.0   ESDF
                                                                           90/09  MEDIUM
                           90/09 MEDIUM
                                                                                          AIR
                                          AIR
                           90/09 MEDIUM    AIR
                           90/09 MEDIUM    AIR
                           90/09 MEDIUM    AIR
                         NOT
                        AVAIL
                          NOT
                         AVAIL
                          NOT
                         AVAIL
90/09 MEDIUM   TOXIC      NOT
             SUBSTANCE   AVAIL
                          NOT
                         AVAIL
 NOT
AVAIL
 NOT
AVAIL
                          NOT       NOT
                         AVAIL     AVAIL
 NOT
AVAIL
 NOT
AVAIL
 NOT
AVAIL
 NOT
AVAIL
 NOT
AVAIL
            NOT
           AVAIL
 NOT
AVAIL
 NOT
AVAIL
 NOT
AVAIL

-------
                                 FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                         VETERANS ADMINISTRATION                 VETERANS ADMINISTRATION
                PROJECT IDENTIFICATION
                     REQ    EST   PROJECT
  BUDGET     COMPL   COMPL  COMPL ASSESS- MEDIA
(THOUSANDS)   STATUS  DATE    DATE   MENT    TYPE
                                                                     VA-18
                            ADEQUACY  OF  PROJECT
                          ENGIN-
                          EERING    TIME     COST
IL-360010372 PROJECT: 5508S1140
REPLACE ASBESTOS INSULATION
ACCT: OTHER
V A M C DANVILLE
DANVILLE                         IL

IL-360010372 PROJECT: 550901120
REPLACE SANITARY SEWER PIPING
ACCT: OTHER
V A M C DANVILLE
DANVILLE                         IL

IL-360010381 PROJECT: 57S901150
REPLACE INCINERATOR B 39
ACCT: OTHER
VA MEDICAL CENTER
HINES                            IL

IL-360010381 PROJECT: 578901220
ASBESTOS ASSESSMENT
ACCT: OTHER
VA MEDICAL CENTER
HINES                            IL

IN-360007300 PROJECT: 610901030
ASBESTOS REMOVAL PH3
ACCT: OTHER
VA MEDICAL CENTER
MARION                           IN

IN-360007300 PROJECT: 610871090
SEWER EXTENSION
ACCT: OTHER
VA MEDICAL CENTER
MARION                           IN
    1,633.0  ESDF
      197.0  ESDF
      355.0   ESDF
      200.0   OTHR
      624.0   ESDF
       63.0   ESDF
90/09 MEDIUM    AIR
                           90/09  MEDIUM   WATER
                           90/09 MEDIUM    AIR
                           90/09 MEDIUM    AIR
                          90/09 MEDIUM    AIR
                          90/09 MEDIUM   WATER
                                                    NOT
                                                   AVAIL
                                                    NOT
                                                   AVAIL
                                                    NOT
                                                   AVAIL
                                                    NOT
                                                   AVAIL
                         NOT
                        AVAIL
                                                    NOT
                                                   AVAIL
                                   NOT
                                   AVAIL
                                   NOT
                                  AVAIL
                                   NOT
                                  AVAIL
                                   NOT
                                  AVAIL
                                                              NOT
                                                             AVAIL
                                   NOT
                                  AVAIL
 NOT
AVAIL
 NOT
AVAIL
 NOT
AVAIL
 NOT
AVAIL
 NOT
AVAIL
 NOT
AVAIL

-------
                                  FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR  FISCAL  YEAR  1991

                          VETERANS ADMINISTRATION                 VETERANS ADMINISTRATION
                 PROJECT  IDENTIFICATION
                    RE3    EST   PROJECT
  BUDGET     COMPL   COMPL  COMPL ASSESS- MEDIA
(THOUSANDS)   STATUS  DATE   DATE  MENT    TYPE
                                                                                                                     VA-19
   ADEQUACY OF PROJECT
 ENGIN-
 EERING    TIME      COST
 IN-360010275  PROJECT: 569901040
 ASBESTOS REMOVAL  PH  2
 ACCT: OTHER
 VA MEDICAL CENTER
 FT. WAYNE                        IN

 IN-360010275  PROJECT: 569891010
 ASBESTOS ASSESSMENT
 ACCT: OTHER
 VA MEDICAL CENTER
 FT. WAYNE                        IN

 IN-360010275  PROJECT: 569881050
HAZARDOUS WASTE STORAGE BUILDING
ACCT: OTHER
VA MEDICAL CENTER
FT. WAYNE                        IN

IN-360010286 PROJECT: 583891010
ASBESTOS ASSESSMENT
ACCT: OTHER
VA MEDICAL CENTER
 INDIANAPOLIS                     IN

 IN-360010286 PROJECT: 583901160
 STREAML/ASBESTOS REPL PH 3
 ACCT: OTHER
 VA MEDICAL CENTER
 INDIANAPOLIS                     IN

 IN-360010286 PROJECT: 583901150
 HAZARDOUS WASTE STORAGE ROOMS
ACCT: OTHER
VA MEDICAL CENTER
INDIANAPOLIS                     IN
                                                      248.0  ESDF
      146.2   ESDF
       22.0   ESDF
      225.0   ESDF
      311.0   OTHR
      132.0   ESDF
                                                                           90/09 MEDIUM
                          90/09 MEDIUM
                                                                                           AIR
                                          AIR
                          90/09 MEDIUM   WATER
                          90/09 MEDIUM
                           90/09 MEDIUM
                                          AIR
                                          AIR
                          90/09 MEDIUM   WATER
                                                    NOT
                                                   AVAIL
 NOT
AVAIL
 NOT
AVAIL
 NOT
AVAIL
                                                    NOT
                                                   AVAIL
                                                    NOT
                                                   AVAIL
           NOT
          AVAIL
 NOT
AVAIL
 NOT
AVAIL
 NOT
AVAIL
           NOT
          AVAIL
           NOT
          AVAIL
            NOT
           AVAIL
 NOT
AVAIL
 NOT
AVAIL
 NOT
AVAIL
            NOT
           AVAIL
            NOT
           AVAIL

-------
                                 FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                         VETERANS ADMINISTRATION                 VETERANS ADMINISTRATION
                PROJECT IDENTIFICATION
                     REQ    EST   PROJECT
  BUDGET     COMPL   COMPL  COMPL ASSESS- MEDIA
(THOUSANDS)  STATUS  DATE   DATE   MENT    TYPE
                                                                     VA-20
   ADEQUACY OF PROJECT
 ENGIN-
 EERING    TIME      COST
IN-360010286 PROJECT: 583S71120
REPLACE SEWER LINES BSMT
ACCT: OTHER
VA MEDICAL CENTER
INDIANAPOLIS                     IN

KS-360010347 PROJECT: 686891030
REMOVE ASBESTOS PHASE 4
ACCT: OTHER
VA MEDICAL CENTER
LEAVENWORTH                      KS

KS-360010347 PROJECT: 686881030
REMOVE ASBESTOS PHASE 3
ACCT: OTHER
VA MEDICAL CENTER
LEAVENWORTH                      KS

KS-360010352 PROJECT: 452871220A
ETO MONITOR
ACCT: OTHER
VA MEDICAL CENTER
WICHITA                          KS

KS-360010722 PROJECT: 637871130
ETO ABATEMENT
ACCT: OTHER
VA MEDICAL CENTER
TOPEKA                           KS

KY-360007294 PROJECT: 596891170
ASBES.EXPOSURE ASSES.
ACCT: OTHER
VA MEDICAL CENTER
LEXINGTON                        KY
       87.0  ESDF
      381.0  ESDF
      431.0  ESDF
       37.0   ESDF
      110.0   ESDF
      315.0   ESDF
                           90/09 MEDIUM   WATER
                           90/09 MEDIUM    AIR
                           90/09  MEDIUM    AIR
                           90/09  MEDIUM    AIR
                           90/09 MEDIUM    AIR
                           90/09 MEDIUM    AIR
                                                    NOT
                                                   AVAIL
 NOT
AVAIL
           NOT
          AVAIL
                                                              NOT
                                                             AVAIL
                                                  ADEQUATE  ADEQUATE
                                                   DESIGN    TIMING
                                                    NOT
                                                   AVAIL
 NOT
AVAIL
                                                    NOT
                                                   AVAIL
           NOT
          AVAIL
                                                              NOT
                                                             AVAIL
           NOT
          AVAIL
 NOT
AVAIL
 NOT
AVAIL
                    ADEQUATE
                    ESTIMATE
 NOT
AVAIL
 NOT
AVAIL
 NOT
AVAIL

-------
                                  FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                          VETERANS ADMINISTRATION                 VETERANS ADMINISTRATION
                 PROJECT IDENTIFICATION
                     REQ     EST   PROJECT
  BUDGET     COMPL    COMPL   COMPL ASSESS- MEDIA
(THOUSANDS)   STATUS   DATE    DATE  MENT    TYPE
                                                                                                                     VA-21
                           ADEQUACY OF PROJECT
                          ENGIN-
                          EERING    TIME      COST
 KY-360010299 PROJECT:  603891020
 ASBESTOS EXP.  ASSES.
 ACCT:  OTHER
 VA  MEDICAL CENTER
 LOUISVILLE                      KY

 KY-360010299 PROJECT:  603861030
 REPL.  WASTE  LINES
 ACCT:  OTHER
 VA  MEDICAL CENTER
 LOUISVILLE                      KY

 LA-360010311  PROJECT:  639821170
 REMOVE PCB TRANSFORMERS
 ACCT:  OTHER
 VA  MEDICAL CENTER
 NEW ORLEANS                      LA

 LA-360010330 PROJECT:  667901020
 ASBESTOS REMOVAL
 ACCT: OTHER
 VA MC SHREVEPORT
 SHREVEPORT                       LA

 MA-360010242 PROJECT:  518871120
 REPL. ASBES.  INSUL.
 ACCT: OTHER
 VA MEDICAL CENTER
 BEDFORD                          MA

 MA-360010246 PROJECT:  523891010
 ASBESTOS ASSESSMENT SURVEY
ACCT: OTHER
VA MEDICAL CENTER
BOSTON                           MA
                                                       55.0  ESDF
      517.0   OTHR
       54.0   ESDF
    1,049.0   ESDF
       98.0   ESDF
      300.0   ESDF
                                                                           90/09 MEDIUM    AIR
                           90/09 MEDIUM   WATER
                                                    NOT
                                                   AVAIL
                                                    NOT
                                                   AVAIL
                           90/09 MEDIUM    AIR
                           90/09 MEDIUM
                           90/09 MEDIUM
                                          AIR
                                          AIR
                          NOT
                         AVAIL
                          NOT
                         AVAIL
                                   NOT
                                  AVAIL
                                   NOT
                                  AVAIL
90/09 MEDIUM   TOXIC      NOT       NOT
             SUBSTANCE    AVAIL      AVAIL
                          NOT       NOT
                         AVAIL     AVAIL
 NOT
AVAIL
 NOT
AVAIL
            NOT
           AVAIL
            NOT
           AVAIL
            NOT
           AVAIL
            NOT
           AVAIL
 NOT
AVAIL
                                                                         NOT
                                                                        AVAIL

-------
                                 FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                         VETERANS ADMINISTRATION                 VETERANS ADMINISTRATION
                PROJECT IDENTIFICATION
                     REQ    EST   PROJECT
  BUDGET     COMPL   COMPL  COMPL ASSESS-  MEDIA
(THOUSANDS)  STATUS  DATE   DATE  MENT     TYPE
                                                                     VA-22
                            ADEQUACY OF  PROJECT
                          ENGIN-
                          EERING    TIME      COST
MA-360010248 PROJECT: 525881120
ASBESTOS ASSESSMENT SURVEY
ACCT: OTHER
VA MEDICAL CENTER
BROCKTON                         MA

MA-360010248 PROJECT: 525891010
ASBESTOS REMOVAL PHASE 3
ACCT: OTHER
VA MEDICAL CENTER
BROCKTON                         MA

MA-360010248 PROJECT: 525881110
REPLACE PCB TRANSFORMERS
ACCT: OTHER
VA MEDICAL CENTER
BROCKTON                         MA

MD-360007289 PROJECT: 566891020
REPAIR INCINERATOR
ACCT: OTHER
VA MEDICAL CENTER
FORT HOWARD                      MD

MD-360007289 PROJECT: 566901120
ASBESTOS ASSESSMENT
ACCT: OTHER
VA MEDICAL CENTER
FORT HOWARD                      MD

MD-360007289 PROJECT: 566901060
ASBESTOS REMOVAL PHASE 2
ACCT: OTHER
VA MEDICAL CENTER
FORT HOWARD                      MD
      235.0  ESDF
      635.0  ESDF
      148.0  ESDF
       20.0  ESDF
       75.0  ESDF
       45.0  ESDF
                           90/09 MEDIUM    AIR
                           90/09 MEDIUM    AIR
                          NOT       NOT
                         AVAIL     AVAIL
                                                    NOT       NOT
                                                   AVAIL     AVAIL
                           90/09  MEDIUM   TOXIC      NOT       NOT
                                        SUBSTANCE   AVAIL     AVAIL
                           90/09 MEDIUM
90/09 MEDIUM
                                          AIR
                                          AIR
                                                    NOT
                                                   AVAIL
                                                    NOT
                                                   AVAIL
                                   NOT
                                  AVAIL
                                   NOT
                                  AVAIL
                                                                         NOT
                                                                        AVAIL
                                              NOT
                                             AVAIL
                                              NOT
                                             AVAIL
 NOT
AVAIL
 NOT
AVAIL
                           90/09 MEDIUM    AIR     ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE

-------
                                 FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR  FISCAL YEAR  1991

                         VETERANS ADMINISTRATION                 VETERANS ADMINISTRATION
                PROJECT IDENTIFICATION
                    REQ    EST   PROJECT
  BUDGET     COMPL   COMPL  COMPL ASSESS- MEDIA
(THOUSANDS)   STATUS  DATE   DATE  MENT    TYPE
                                                                                                                     VA-23
                           ADEQUACY OF PROJECT
                          ENGIN-
                          EERING    TIME      COST
MD-360007308 PROJECT: 641881100
REPL 11 ASBESTOS HEAT WHEELS
ACCT: OTHER
VA MEDICAL CENTER
PERRY POINT (PERRYVILLE)         MD

MD-360007308 PROJECT: 641901030
INFECTION CONTROL DEF.
ACCT: OTHER
VA MEDICAL CENTER
PERSY POINT (PERRYVILLE)         MD

MD-360007308 PROJECT: 641881380
REPLACE PCB TRANSFORMERS
ACCT: OTHER
VA MEDICAL CENTER
PERRY POINT (PERRYVILLE)         MD

MI-360007311 PROJECT: 655891060
ASBESTOS ASSESSMENT
ACCT: OTHER
VA MEDICAL CENTER
SAGINAW                          MI

MI-360010239 PROJECT: 506891110
FACILITY ASBESTOS ASSESSMENT
ACCT: OTHER
VA MEDICAL CENTER
ANN ARBOR                        MI

MI-360010239 PROJECT: 506881020
UPGRADE INCINERATOR
ACCT: OTHER
VA MEDICAL CENTER
ANN ARBOR                        MI
                                                      435.0  ESDF
      178.0   ESDF
       70.0   ESDF
       45.0   ESDF
       42.0   ESDF
      294.0   ESDF
                                                                           90/09  MEDIUM
                           90/09 MEDIUM
                                                                                          AIR
                                          AIR
                                                    NOT
                                                   AVAIL
                          NOT
                         AVAIL
                                   NOT
                                  AVAIL
 NOT
AVAIL
                           90/09 MEDIUM
                           90/09 MEDIUM
                                          AIR
                                          AIR
                           90/09 MEDIUM    AIR
                          NOT
                         AVAIL
                          NOT
                         AVAIL
                          NOT
                         AVAIL
 NOT
AVAIL
 NOT
AVAIL
 NOT
AVAIL
            NOT
           AVAIL
 NOT
AVAIL
90/09 MEDIUM   TOXIC    ADEQUATE   ADEQUATE   ADEQUATE
             SUBSTANCE    DESIGN     TIMING    ESTIMATE
 NOT
AVAIL
 NOT
AVAIL
 NOT
AVAIL

-------
                                 FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR  1991

                         VETERANS ADMINISTRATION                 VETERANS ADMINISTRATION
                PROJECT IDENTIFICATION
                     REQ    EST    PROJECT
  BUDGET     COMPL   COMPL  COMPL  ASSESS- MEDIA
(THOUSANDS)   STATUS  DATE    DATE   MENT    TYPE
                                                                                                                     VA-24
    ADEQUACY OF PROJECT
  ENGIN-
  EERING    TIME      COST
MI-360010239 PROJECT: 506901090
ASBESTOS REMOVAL PHASE 2
ACCT: OTHER
VA MEDICAL CENTER
ANN ARBOR                        MI

MI-360010289 PROJECT: 585891110
ASBESTOS SURVEY
ACCT: OTHER
VA MEDICAL CENTER
IRON MOUNTAIN                    MI

MI-360010365 PROJECT: 515881010
REPLACE PCB TRANSFORMERS
ACCT: OTHER
VA MEDICAL CENTER
BATTLE CREEK                     MI

MI-360010365 PROJECT: 515901150
REPLACE UNDERGROUND STORAGE TANKS
ACCT: OTHER
VA MEDICAL CENTER
BATTLE CREEK                     MI

MN-360010334 PROJECT: 656871010
REPL ASBESTOS PIPE COVER PH 4
ACCT: OTHER
VA MEDICAL CENTER
ST CLOUD                         MN

MN-360010334 PROJECT: 65687
REPLACE FL LITE BALLASTS
ACCT: OTHER
VA MEDICAL CENTER
ST CLOUD                         MN
      398.0  OTHR
       50.0  ESDF
      125.0  ESDF
      101.0  ESDF
      639.0  ESDF
      244.0  ESDF
                           90/09  MEDIUM    AIR
                           90/09 MEDIUM    AIR
ADEQUATE  ADEQUATE   ADEQUATE
 DESIGN    TIMING    ESTIMATE
                                                    NOT       NOT
                                                   AVAIL     AVAIL
                           90/09 MEDIUM   TOXIC      NOT       NOT
                                       SUBSTANCE   AVAIL     AVAIL
                           90/09 MEDIUM   WATER      NOT       NOT
                                                   AVAIL     AVAIL
                           90/09 MEDIUM
                                          AIR
                                                    NOT
                                                   AVAIL
                           90/09 MEDIUM   TOXIC      NOT
                                       SUBSTANCE   AVAIL
            NOT
           AVAIL
            NOT
           AVAIL
                       NOT
                      AVAIL
                       NOT
                      AVAIL
                       NOT
                      AVAIL
 NOT
AVAIL
 NOT
AVAIL

-------
                                  FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                          VETERANS ADMINISTRATION                 VETERANS ADMINISTRATION
                 PROJECT IDENTIFICATION
                     REQ     EST    PROJECT
  BUDGET     COMPL   COMPL   COMPL  ASSESS- MEDIA
(THOUSANDS)   STATUS   DATE    DATE   MENT    TYPE
                                                                                                                     VA-25
                            ADEQUACY OF PROJECT
                          ENGIN-
                          EERING    TIME      COST
 MN-360010334 PROJECT:  656871110
 REPL PC3 FL LITE  BALLASTS
 ACCT:  OTHER
 VA  MEDICAL CENTER
 ST  CLOUD
                                 MN
 MO-360010292  PROJECT: 589901020
 ASBESTOS  MECHANICAL  SPACES
 ACCT:  OTHER
 VA  MEDICAL CENTER
 KANSAS CITY                      MO

 MO-360010320  PROJECT: 647811020
 REPL.  SANI SEWER LINES GR
 ACCT:  OTHER
 VA  MEDICAL CENTER
 POPLAR BLUFF                     MO

 MO-360010335  PROJECT: 657901140
 ASBESTOS ABATEMENT B 1 & 2 NC
 ACCT: OTHER
 VA  MEDICAL CENTER
 ST. LOUIS                        MO

 MO-360010335  PROJECT: 657881050
 REPL PCB TRANSF
 ACCT: OTHER
 VA MEDICAL CENTER
 ST. LOUIS                        MO

MS-360010243  PROJECT: 520901100
ASBES.  ABATE.  QUARTERS
ACCT: OTHER
VA MEDICAL CENTER
BILOXI                            MS
                                                      244.0  ESDF
                                                      321.0  ESDF
      265.0   ESDF
      749.0   ESDF
       65.0   OTHR
      150.0   ESDF
                                                                           90/09 MEDIUM   WATER
                                                                           90/09 MEDIUM    AIR
                                                    NOT
                                                   AVAIL
                                                    NOT
                                                   AVAIL
                                   NOT
                                  AVAIL
                                   NOT
                                  AVAIL
                           90/09 MEDIUM    AIR
                          NOT       NOT
                         AVAIL     AVAIL
                           90/09 MEDIUM    AIR
                          NOT       NOT
                         AVAIL     AVAIL
 NOT
AVAIL
 NOT
AVAIL
90/09 MEDIUM   WATER    ADEQUATE   ADEQUATE   ADEQUATE
                         DESIGN    TIMING    ESTIMATE
 NOT
AVAIL
90/09 MEDIUM   TOXIC    ADEQUATE   ADEQUATE    ADEQUATE
             SUBSTANCE   DESIGN    TIMING    ESTIMATE
                                                                         NOT
                                                                        AVAIL

-------
                                 FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                         VETERANS ADMINISTRATION                 VETERANS ADMINISTRATION
                PROJECT IDENTIFICATION
                     REQ    EST   PROJECT
  BUDGET     COMPL   COMPL  COMPL ASSESS-  MEDIA
(THOUSANDS)  STATUS  DATE   DATE   MENT     TYPE
                                                                     VA-26
  ADEQUACY OF PROJECT
ENGIN-
EERING    TIME      COST
MS-360010243 PROJECT: 520891010
ASBESTOS ASSESSMENT LODGES/SVC
ACCT: OTHER
VA MEDICAL CENTER
BILOXI                           MS

MS-360010243 PROJECT: 520901050
REPLACE BURIED TANKS
ACCT: OTHER
VA MEDICAL CENTER
BILOXI                           MS

MS-360012949 PROJECT: 586891040
ASBESTOS ABATEMENT
ACCT: OTHER
V A MEDICAL CENTER
JACKSON                          MS

MS-360012949 PROJECT: 586891020
REPLACE INCINERATOR
ACCT: OTHER
V A MEDICAL CENTER
JACKSON                          MS

MS-360012949 PROJECT: 586881080
ASBES. EXPOS. ASSESSMENT
ACCT: OTHER
V A MEDICAL CENTER
JACKSON                          MS

MT-360010271 PROJECT: 436861020
SEWER SYSTEM ASSESSMENT
ACCT: OTHER
VA MEDICAL & AND REGIONAL OFFICE
FORT HARRISON                    MT
        9.2  ESDF
      399.0  ESDF
      400.0  ESDF
      281.5  ESDF
       65.0  ESDF
       25.9  OTHR
                           90/09 MEDIUM    AIR
                           90/09 MEDIUM    WATER
                           90/09  MEDIUM    AIR
                           90/09  MEDIUM    AIR
                           90/09 MEDIUM    AIR
                           90/09 MEDIUM   WATER
                                                    NOT
                                                   AVAIL
                                                    NOT
                                                   AVAIL
          NOT
         AVAIL
          NOT
         AVAIL
                                                  ADEQUATE  ADEQUATE
                                                   DESIGN    TIMING
                                                    NOT
                                                   AVAIL
                                                    NOT
                                                   AVAIL
          NOT
         AVAIL
          NOT
         AVAIL
                                                  ADEQUATE  ADEQUATE
                                                   DESIGN    TIMING
 NOT
AVAIL
 NOT
AVAIL
                   ADEQUATE
                   ESTIMATE
 NOT
AVAIL
 NOT
AVAIL
                  ADEQUATE
                  ESTIMATE

-------
                                  FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                          VETERANS ADMINISTRATION                 VETERANS ADMINISTRATION
                 PROJECT IDENTIFICATION
                     REQ     EST   PROJECT
  BUDGET     COMPL    COMPL   COMPL ASSESS- MEDIA
(THOUSANDS)   STATUS   DATE    DATE  MENT    TYPE
                                                                                                                     VA-27
   ADEQUACY OF PROJECT
 ENGIN-
 EERING    TIME      COST
 MT-360010303 PROJECT:  617871060
 CORR COMBUSTION DEF
 ACCT:  OTHER
 V A MEDICAL CENTER
 MILES  CITY                       MT

 MT-360010303 PROJECT:  617681100
 REMOVE ASBESTOS B 3
 ACCT:  OTHER
 V A MEDICAL CENTER
 MILES  CITY                       MT

 NC-360010269 PROJECT:  565871010
 NURSE  CALL/ASBESTOS REMOVAL
 ACCT:  OTHER
 VA  MEDICAL  CENTER
 FAYETTEVILLE                     NC

 NC-360010389  PROJECT:  637881180
 RMV ASBES HSKPNG QTRS
 ACCT:  OTHER
 VA MEDICAL  CENTER
 ASHEVILLE                        NC

 NC-360010389  PROJECT:  637861050
 REPL.  TRANSFORMERS B 47
 ACCT:  OTHER
 VA MEDICAL  CENTER
 ASHEVILLE                        NC

NE-360010278  PROJECT: 574901020
ASBESTOS REMOVAL D WING
ACCT: OTHER
VA MEDICAL CENTER
GRAND ISLAND                     NE
                                                       58.0  ESDF
       15.0   ESDF
    1,230.0   ESDF
      148.0   OTHR
      265.0   ESDF
      59.0   ESDF
                                                                           90/09 MEDIUM    AIR
                          90/09 MEDIUM
                          90/09 MEDIUM
                                          AIR
                                          AIR
                          90/09 MEDIUM    AIR
                                                    NOT
                                                   AVAIL
                                                    NOT
                                                   AVAIL
 NOT
AVAIL
           NOT
          AVAIL
           NOT
          AVAIL
 NOT
AVAIL
                                                    NOT       NOT
                                                   AVAIL     AVAIL
                          90/09 MEDIUM    AIR
                                                    NOT
                                                   AVAIL
           NOT
          AVAIL
            NOT
           AVAIL
            NOT
           AVAIL
 NOT
AVAIL
                      NOT
                     AVAIL
                          90/09 MEDIUM   TOXIC    ADEQUATE  ADEQUATE   ADEQUATE
                                       SUBSTANCE   DESIGN    TIMING    ESTIMATE
            NOT
           AVAIL

-------
                                 FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                         VETERANS ADMINISTRATION                 VETERANS ADMINISTRATION
                PROJECT IDENTIFICATION
                     REQ    EST   PROJECT
  BUDGET     COMPL   COMPL  COMPL ASSESS- MEDIA
(THOUSANDS)   STATUS  DATE   DATE   MENT     TYPE
                                                                                                                      VA-28
                            ADEQUACY OF PROJECT
                          ENGIN-
                          EERING    TIME      COST
NH-360010300 PROJECT: 608891010
ASBESTOS BASELINE ASSESSMENT
ACCT: OTHER
VA MEDICAL CENTER
MANCHESTER                       NH

NJ-360010325 PROJECT: 604901120
ASBESTOS ASSESSMENT
ACCT: OTHER
V AMC LYONS
LYONS                            NJ

NJ-360010385 PROJECT: 604891110
REPLACE INCINERATOR
ACCT: OTHER
VA MEDICAL CENTER
LYONS                            NJ

NJ-360010385 PROJECT: 604901020
REMOVE ASBESTOS
ACCT: OTHER
VA MEDICAL CENTER
LYONS                            NJ

NJ-360010385 PROJECT: 604871080
DEMO VACANT SEWER PLANT
ACCT: OTHER
VA MEDICAL CENTER
LYONS                            NJ

NM-360007270 PROJECT: 501891240
ASBESTOS ASSESSMENT
ACCT: OTHER
VA MEDICAL CENTER
ALBUQUERQUE                      NM
       60.0  ESDF
       99.0   ESDF
      920.0  ESDF
      198.0   ESDF
      190.0  ESDF
       90.0   ESDF
90/09 MEDIUM    AIR
                           90/09  MEDIUM     AIR
                           90/09  MEDIUM    AIR
                           90/09  MEDIUM    AIR
                           90/09  MEDIUM   WATER
                           90/09  MEDIUM    AIR
                                                    NOT
                                                   AVAIL
                                                    NOT
                                                   AVAIL
                                                    NOT
                                                   AVAIL
                                                    NOT
                                                   AVAIL
                                                    NOT
                                                   AVAIL
                                                    NOT
                                                   AVAIL
                                    NOT
                                   AVAIL
                                    NOT
                                   AVAIL
                                    NOT
                                   AVAIL
                                   NOT
                                   AVAIL
                                   NOT
                                  AVAIL
                                   NOT
                                  AVAIL
 NOT
AVAIL
 NOT
AVAIL
 NOT
AVAIL
 NOT
AVAIL
 NOT
AVAIL
 NOT
AVAIL

-------
                                  FEDERAL  AGENCY  POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                          VETERANS ADMINISTRATION                VETERANS ADMINISTRATION
                 PROJECT IDENTIFICATION
                     REQ     EST    PROJECT
  BUDGET     COMPL   COMPL   COMPL  ASSESS- MEDIA
(THOUSANDS)   STATUS  DATE    DATE   MENT    TYPE
                                                                                                                      VA-29
    ADEQUACY OF PROJECT
  ENGIN-
  EERING    TIME      COST
 NY-360007279 PROJECT:  526841240
 ET 0 ABATEMENT
 ACCT:  OTHER
 VA MEDICAL CENTER
 BRONX,  NEW YORK CITY             NY

 NY-360007280 PROJECT:  528891070
 ASBESTOS  SURVEY
 ACCT:  OTHER
 VA MEDICAL CENTER
 BUFFALO                         NY

 NY-360007280 PROJECT:  528901010
 REPLACE INCINERATOR
 ACCT: OTHER
 VA MEDICAL CENTER
 BUFFALO                         NY

 NY-360007280  PROJECT:  528901050
 REPLACE ASBESTOS PIPE  INSULATION
 ACCT: OTHER
 VA MEDICAL CENTER
 BUFFALO                          NY

 NY-360007280  PROJECT:  528851060
 ASBESTOS REMOVAL, CRAWL SP-B1
 ACCT: OTHER
 VA  MEDICAL CENTER
 BUFFALO                          NY

 NY-360007280  PROJECT:  528881110
 HAZ. WASTE STOR. FAC.
ACCT: OTHER
VA MEDICAL CENTER
BUFFALO                          NY
                                                       16.0  ESDF
       83.0   ESDF
    3,843.0   ESDF
      465.5   ESDF
      703.6   ESDF
       24.0   ESDF
                                                                           90/09 MEDIUM    AIR
                           90/09 MEDIUM    AIR
                           90/09 MEDIUM    AIR
                           90/09 MEDIUM    AIR
                           90/09 MEDIUM    AIR
                          90/09 MEDIUM   WATER
                                                  ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
                                                    NOT
                                                   AVAIL
  NOT
 AVAIL
            NOT
           AVAIL
 NOT
AVAIL
            NOT
           AVAIL
 NOT
AVAIL
ADEQUATE  ADEQUATE   ADEQUATE
 DESIGN    TIMING    ESTIMATE
                                                    NOT
                                                   AVAIL
                                                    NOT
                                                   AVAIL
            NOT
           AVAIL
            NOT
           AVAIL
            NOT
           AVAIL
            NOT
           AVAIL

-------
                                 FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                         VETERANS ADMINISTRATION                 VETERANS ADMINISTRATION
                PROJECT IDENTIFICATION
                     REQ    EST   PROJECT
  BUDGET     COMPL   COMPL  COMPL ASSESS-  MEDIA
(THOUSANDS)   STATUS  DATE   DATE  MENT    TYPE
                                                                     VA-30
                            ADEQUACY OF  PROJECT
                          ENGIN-
                          EERING    TIME      COST
NY-360007Z82 PROJECT: 533S81110
ASBESTOS SURVEY
ACCT: OTHER
NY-360007282 PROJECT: 533901110
COMPACTOR ENCLOSURE
ACCT: OTHER
                                 NY
                                 NY
NY-360007282 PROJECT: 533871040
REMOVE UNDERGROUND STORAGE TANKS
ACCT: OTHER
NY-360007282 PROJECT: 533901050
REMOVE UG STORAGE TANKS
ACCT: OTHER
NY-360007282 PROJECT: 532841010
REPLACE WASTELINES
ACCT: OTHER
                                 NY
                                 NY
                                 NY
NY-360010236 PROJECT: 500901080
REMOVE ASBESTOS SUBBASEMENT
ACCT: OTHER
VA MEDICAL CENTER
ALBANY                           NY
      200.0  OTHR
       35.0  OTHR
       76.0  PSDF
                                                       76.0  OTHR
                                                       87.0  ESRO
                                                      699.0  ESDF
                           90/09 MEDIUM    AIR
                          NOT       NOT
                         AVAIL     AVAIL
90/09 MEDIUM   NOISE      NOT       NOT
                         AVAIL     AVAIL
                                                                         NOT
                                                                        AVAIL
                                                                         NOT
                                                                        AVAIL
90/09 MEDIUM   SOLID    ADEQUATE   ADEQUATE   ADEQUATE
               WASTE     DESIGN    TIMING    ESTIMATE
                           90/09 MEDIUM    SOLID
                                          WASTE
                                                                           90/09 MEDIUM   WATER
                           90/09  MEDIUM    AIR
                        ADEQUATE   ADEQUATE   ADEQUATE
                         DESIGN    TIMING    ESTIMATE
                                                    NOT       NOT        NOT
                                                   AVAIL     AVAIL      AVAIL
                                                    NOT       NOT        NOT
                                                   AVAIL     AVAIL      AVAIL

-------
                                  FEDERAL AGENCY  POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                          VETERANS ADMINISTRATION                VETERANS ADMINISTRATION
                 PROJECT IDENTIFICATION
                     REQ    EST    PROJECT
  BUDGET     COMPL   COMPL   COMPL  ASSESS- MEDIA
(THOUSANDS)   STATUS  DATE    DATE   MENT    TYPE
                                                                                                                      VA-31
  ADEQUACY OF PROJECT
ENGIN-
EERING    TIME      COST
 NY-360010236 PROJECT:  500891250
 ASBESTOS ABATEMENT BASEMENT  PH
 ACCT:  OTHER
 VA MEDICAL CENTER
 ALBANY                          NY

 NY-360010236 PROJECT:  500891010
 ASBESTOS SURVEY
 ACCT:  OTHER
 VA MEDICAL CENTER
 ALBANY                          NY
                                                       27.9  ESDF
       96.2   ESDF
                                                                           90/09 MEDIUM
                           90/09 MEDIUM
                                                                                           AIR
                                          AIR
                                                    NOT
                                                   AVAIL
                                                    NOT
                                                   AVAIL
          NOT
         AVAIL
          NOT
         AVAIL
 NOT
AVAIL
 NOT
AVAIL
NY-360010249  PROJECT: 527891050
ASBESTOS  SURVEY PH  1
ACCT: OTHER
VA MEDICAL CENTER
BROOKLYN
                                 NY
NY-360010249 PROJECT: 527891210
ASBESTOS ASSESSMENT PH II
ACCT: OTHER
VA MEDICAL CENTER
BROOKLYN                         NY

NY-360010251 PROJECT: 532901010
INCINERATOR PLANT TECH STUDY
ACCT: OTHER
VA MEDICAL CENTER
CANANDAIGUA                      NY

NY-360010307 PROJECT: 620841310
REMOVE ASBESTOS IN PIPE
ACCT: OTHER
VA MEDICAL CENTER
MONTROSE                         NY
                                                       45.0  ESDF
                                                       42.0  OTHR
       40.0   ESDF
    4,503.0   OTHR
                           90/09  MEDIUM
                           90/09 MEDIUM
                           90/09 MEDIUM
                           90/09 MEDIUM
                                          AIR
                                          AIR
                                          AIR
                                          AIR
                                                    NOT
                                                   AVAIL
                                                    NOT
                                                   AVAIL
                                                    NOT
                                                   AVAIL
          NOT
         AVAIL
          NOT
         AVAIL
          NOT
         AVAIL
 NOT
AVAIL
 NOT
AVAIL
 NOT
AVAIL
                                                  ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE

-------
                                 FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                         VETERANS ADMINISTRATION                 VETERANS ADMINISTRATION
                PROJECT IDENTIFICATION
                     REQ    EST   PROJECT
  BUDGET     COMPL   COMPL  COMPL ASSESS-  MEDIA
(THOUSANDS)   STATUS  DATE   DATE   MENT     TYPE
                                                                                                                     VA-3Z
  ADEQUACY OF PROJECT
ENGIN-
EERING    TIME      COST
NY-360010312 PROJECT: 632841100
PIPE & DUCT INSULATION PH3
ACCT: OTHER
VA MEDICAL CENTER
NORTHPORT                        NY

NY-360010312 PROJECT: 6328810*0
PIPE & DUCT INSULATION PH VI
ACCT: OTHER
VA MEDICAL CENTER
NORTHPORT                        NY

NY-360010312 PROJECT: 632891030
PUBLIC WATER CONNECTIONS
ACCT: OTHER
VA MEDICAL CENTER
NORTHPORT                        NY

NY-360010363 PROJECT: 514881170
DESIGN INCINERATOR
ACCT: OTHER
VA MEDICAL CENTER
BATH                             NY

NY-360010363 PROJECT: 514891010
REPLACE INCINERATOR
ACCT: OTHER
VA MEDICAL CENTER
BATH                             NY

NY-360010387 PROJECT: 630891030
ASBESTOS REMOVAL PH4
ACCT: OTHER
VA MEDICAL CENTER
NEW YORK                         NY
      177.0  OTHR
      352.0  OTHR
      189.0  OTHR
       80.0  ESDF
      479.0  OTHR
      371.0  OTHR
                           90/09 MEDIUM    AIR
                           90/09  MEDIUM    AIR
                                                    NOT       NOT
                                                   AVAIL     AVAIL
                                                    NOT
                                                   AVAIL
          NOT
         AVAIL
                           90/09 MEDIUM
                           90/09 MEDIUM
                                          AIR
                                          AIR
                                                    NOT       NOT
                                                   AVAIL     AVAIL
                           90/09 MEDIUM    AIR
                                                    NOT       NOT
                                                   AVAIL     AVAIL
                     NOT
                    AVAIL
 NOT
AVAIL
                           90/09  MEDIUM  DRINKING  ADEQUATE  ADEQUATE   ADEQUATE
                                         WATER     DESIGN    TIMING    ESTIMATE
                    NOT
                   AVAIL
                                                  ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
                    NOT
                   AVAIL

-------
                                  FEDERAL AGENCY  POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                          VETERANS ADMINISTRATION                VETERANS ADMINISTRATION
                 PROJECT IDENTIFICATION
                     REQ     EST   PROJECT
  BUDGET     COMPL    COMPL   COMPL ASSESS- MEDIA
(THOUSANDS)   STATUS   DATE    DATE  MENT    TYPE
                                                                                                                      VA-33
  ADEQUACY OF PROJECT
ENGIN-
EERING    TIME      COST
 NY-360010387 PROJECT:  630881040
 ASBESTOS REMOVAL
 ACCT:  OTHER
 VA MEDICAL CENTER
 NEW YORK                        NY

 NY-360010396 PROJECT:  670901010
 REPLACE  PATHOLOGICAL INCINERAT
 ACCT:  OTHER
 VA MEDICAL CENTER
 SYRACUSE                        NY

 NY-360010396 PROJECT:  670881080
 REPLACE  WATER  FOUNTAINS
 ACCT:  OTHER
 VA MEDICAL CENTER
 SYRACUSE                         NY

 OH-360007286 PROJECT:  552901030
 REM/REPL PIPE  INSUL ASBESTOS
 ACCT:  OTHER
 VA  MEDICAL CENTER
 DAYTON                           OH

 OH-360007286 PROJECT:  552861090
 BACKFLOW PREVENT  WATER SUPPLY
 ACCT: OTHER
 VA  MEDICAL CENTER
 DAYTON                           OH

 OH-360010254 PROJECT: 538901150
 ASBESTOS ASSESSMENT
ACCT: OTHER
VA MEDICAL CENTER
CHILLICOTHE                      OH
                                                      349.0  OTHR
       99.8   OTHR
      459.0   OTHR
      662.0   OTHR
       70.2   OTHR
      125.0  OTHR
                                                                           90/09 MEDIUM
                           90/09 MEDIUM
                                                                                           AIR
                                          AIR
                           90/09 MEDIUM   HATER
                           90/09 MEDIUM    AIR
                          90/09 MEDIUM   WATER
                          90/09 MEDIUM    AIR
                                                    NOT
                                                   AVAIL
                                                    NOT
                                                   AVAIL
                                                    NOT
                                                   AVAIL
          NOT
         AVAIL
          NOT
         AVAIL
          NOT
         AVAIL
                                                    NOT
                                                   AVAIL
                                                    NOT
                                                   AVAIL
          NOT
         AVAIL
          NOT
         AVAIL
 NOT
AVAIL
 NOT
AVAIL
 NOT
AVAIL
                                                  ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
 NOT
AVAIL
 NOT
AVAIL

-------
                                 FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                         VETERANS ADMINISTRATION                 VETERANS ADMINISTRATION
                PROJECT IDENTIFICATION
                     REQ    EST   PROJECT
  BUDGET     COMPL   COMPL  COMPL ASSESS- MEDIA
(THOUSANDS)   STATUS  DATE   DATE  MENT    TYPE
                                                                     VA-34
                            ADEQUACY OF PROJECT
                          ENGIN-
                          EERING    TIME      COST
OH-360010254 PROJECT: 538801370
REPLACE PCB TRANSFORMERS
ACCT: OTHER
VA MEDICAL CENTER
CHILLICOTHE                      OH

OH-360010254 PROJECT: 538871060
RENOV SANITARY MANHOLES
ACCT: OTHER
VA MEDICAL CENTER
CHILLICOTHE                      OH

OH-360010254 PROJECT: 538861060
RENOV STORM DRAIN SYSTEM
ACCT: OTHER
VA MEDICAL CENTER
CHILLICOTHE                      OH

OH-360010368 PROJECT: 757861040
ASBESTOS REMOVAL PHII
ACCT: OTHER
VA MEDICAL CENTER
CLEVELAND                        OH

OH-360010368 PROJECT: 541901090
ASBESTOS ASSESSMENT
ACCT: OTHER
VA MEDICAL CENTER
CLEVELAND                        OH

OH-360010368 PROJECT: 541861060
REPL PIPE INSUL PHI
ACCT: OTHER
VA MEDICAL CENTER
CLEVELAND                        OH
      139.0  ESDF
      108.0  OTHR
       56.0  OTHR
      232.0  OTHR
      150.0  OTHR
      270.0  OTHR
                           90/09 MEDIUM   TOXIC     ADEQUATE  ADEQUATE   ADEQUATE
                                        SUBSTANCE    DESIGN    TIMING    ESTIMATE
90/09 MEDIUM   WATER
                           90/09 MEDIUM   WATER
                           90/09  MEDIUM
90/09 MEDIUM
                                          AIR
                                          AIR
                           90/09  MEDIUM    AIR
                                                    NOT       NOT
                                                    AVAIL     AVAIL
                                                    NOT
                                                   AVAIL
                                                    NOT
                                                   AVAIL
                                    NOT
                                   AVAIL
                                    NOT
                                   AVAIL
                                                    NOT       NOT
                                                   AVAIL     AVAIL
                                               NOT
                                              AVAIL
                                                   ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
 NOT
AVAIL
 NOT
AVAIL
                                              NOT
                                             AVAIL

-------
                                  FEDERAL AGENCY  POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                          VETERANS ADMINISTRATION                VETERANS ADMINISTRATION
                 PROJECT IDENTIFICATION
                     REQ     EST   PROJECT
  BUDGET     COMPL    COMPL   COMPL ASSESS- MEDIA
(THOUSANDS)   STATUS   DATE    DATE  MENT    TYPE
                                                                                                                      VA-35
  ADEQUACY OF PROJECT
ENGIN-
EERING    TIME      COST
 OH-360010368 PROJECT:  541881150
 INSTALL BACKFLOW PREVENTORS
 ACCT: OTHER
 VA MEDICAL CENTER
 CLEVELAND                       OH

 OH-360010368 PROJECT:  757861030
 REPL WATER PIPING Bl PHI
 ACCT: OTHER
 VA MEDICAL CENTER
 CLEVELAND                       OH

 OH-360010368 PROJECT:  757861180
 REPL WATER PIPING Bl PHIII
 ACCT:  OTHER
 VA MEDICAL CENTER
 CLEVELAND                       OH

 OH-360010369 PROJECT:  539901310
 ASBESTOS  BASELINE  SURVEY
 ACCT:  OTHER
 VA MEDICAL CENTER
 CINCINNATI                      OH

 OH-360010369  PROJECT:  539881280
 REMOVE ASBESTOS B64
 ACCT:  OTHER
 VA MEDICAL CENTER
 CINCINNATI                       OH

OH-360010369  PROJECT:  539871150
 PCB ELEC MODIFICATIONS
ACCT: OTHER
VA MEDICAL CENTER
CINCINNATI                       OH
         .0   OTHR
      209.0   OTHR
      234.0   OTHR
       66.0  OTHR
      101.0  OTHR
      124.0  OTHR
                           90/09 MEDIUM   WATER    ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
                           90/09 MEDIUM   WATER
                          90/09 MEDIUM   WATER
                          90/09 MEDIUM    AIR
                          90/09 MEDIUM    AIR
                                                    NOT
                                                   AVAIL
                                                    NOT
                                                   AVAIL
                                                    NOT
                                                   AVAIL
          NOT
         AVAIL
          NOT
         AVAIL
          NOT
         AVAIL
                                                    NOT       NOT
                                                   AVAIL     AVAIL
 NOT
AVAIL
 NOT
AVAIL
 NOT
AVAIL
                     NOT
                    AVAIL
                          90/09 MEDIUM   TOXIC    ADEQUATE  ADEQUATE   ADEQUATE
                                       SUBSTANCE   DESIGN    TIMING    ESTIMATE

-------
                                 FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                         VETERANS ADMINISTRATION                 VETERANS ADMINISTRATION
                PROJECT IDENTIFICATION
                     REQ    EST   PROJECT
  BUDGET     COMPL   COMPL  COMPL ASSESS- MEDIA
(THOUSANDS)  STATUS  DATE    DATE   MENT     TYPE
                                                                     VA-36
                            ADEQUACY OF PROJECT
                          ENGIN-
                          EERING    TIME      COST
OH-360010369 PROJECT: 539881150
REPL WASTE PIPING PHII
ACCT: OTHER
VA MEDICAL CENTER
CINCINNATI                       OH

PA-360010237 PROJECT: 50389101
REPLACE PCB TRANSFORMER
ACCT: OTHER
VA MEDICAL CENTER
ALTOONA                          PA

PA-360010390 PROJECT: 646901190
REPLACE PCB CAPACITORS
ACCT: OTHER
VA MEDICAL CENTER
PITTSBURGH                       PA

SD-360010273 PROJECT: 568891080
REPLACE PCB TRANSFORMERS PH 2
ACCT: OTHER
VA MEDICAL CENTER
FORT MEADE                       SD

SD-360010273 PROJECT: 568891010
REPLACE PCB TRANSFORMERS PHI
ACCT: OTHER
VA MEDICAL CENTER
FORT MEADE                       SD

VA-360010391 PROJECT: 658891010
PCB REMOVAL AND DISPOSAL
ACCT: OTHER
VA MEDICAL CENTER
SALEM                            VA
      105.0  OTHR
       77.0  ESDF
       62.7  OTHR
      364.0  ESDF
      483.0  OTHR
       35.0  ESDF
                           90/09 MEDIUM    WATER      NOT       NOT
                                                   AVAIL     AVAIL
                                               NOT
                                              AVAIL
                           90/09  MEDIUM   TOXIC    ADEQUATE  ADEQUATE   ADEQUATE
                                       SUBSTANCE   DESIGN    TIMING    ESTIMATE
                           90/09  MEDIUM   TOXIC    ADEQUATE  ADEQUATE   ADEQUATE
                                       SUBSTANCE   DESIGN    TIMING    ESTIMATE
                           90/09 MEDIUM   TOXIC    ADEQUATE  ADEQUATE   ADEQUATE
                                       SUBSTANCE   DESIGN    TIMING    ESTIMATE
                           90/09 MEDIUM   TOXIC      NOT       NOT        NOT
                                       SUBSTANCE   AVAIL     AVAIL      AVAIL
90/09 MEDIUM   TOXIC      NOT       NOT        NOT
             SUBSTANCE    AVAIL     AVAIL      AVAIL

-------
                                  FEDERAL AGENCY POLLUTION  ABATEMENT PLAN FOR FISCAL YEAR 1991

                          VETERANS ADMINISTRATION                VETERANS ADMINISTRATION
                 PROJECT IDENTIFICATION
                     REQ     EST    PROJECT
  BUDGET     COMPL    COMPL   COMPL  ASSESS- MEDIA
(THOUSANDS)   STATUS   DATE    DATE   MENT    TYPE
                                                                                                                      VA-37
    ADEQUACY OF PROJECT
  ENGIN-
  EERING    TIME      COST
 VT-360010403 PROJECT:  405891010
 IH ASSESSMENT SURVEY ASBESTOS
 ACCT: OTHER
 VA MEDICAL & REGIONAL OFFICE
 WHITE RIVER JUNCTION             VT

 WA-360007313 PROJECT:  663871080
 RENOV TRASH CHUTE  SYST
 ACCT: OTHER
 VA MEDICAL CENTER
 SEATTLE                           WA

 WA-360007315 PROJECT:  687891010
 ASBESTOS  ASSESSMENT
 ACCT:  OTHER
 VA MEDICAL CENTER
 WALLA WALLA                      WA

 WA-360010333 PROJECT:  668861110
 INSTAL INCINERATOR
 ACCT:  OTHER
 V  A MEDICAL  CENTER
 SPOKANE                           WA

 WA-360010333  PROJECT:  668901060
 ASBESTOS ABATEMENT B5-8
 ACCT:  OTHER
 V  A MEDICAL CENTER
 SPOKANE                          WA

 WA-360010333  PROJECT:  668901120
 INSTALL INCINERATOR
ACCT: OTHER
V A MEDICAL CENTER
SPOKANE                          WA
                                                       101.0  OTHR
      395.0   OTHR
       33.0   OTHR
      232.0   ESDF
      308.0  OTHR
      232.0  OTHR
                                                                           90/09 MEDIUM    AIR
                           90/09 MEDIUM   SOLID
                                         WASTE
                           90/09 MEDIUM    AIR
                           90/09 MEDIUM    AIR
                          90/09 MEDIUM    AIR
                          90/09 MEDIUM    AIR
                                                    NOT
                                                   AVAIL
            NOT
           AVAIL
 NOT
AVAIL
ADEQUATE  ADEQUATE   ADEQUATE
 DESIGN    TIMING    ESTIMATE
                                                  ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
                                                  ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
                                                  ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
                                                  ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE

-------
                                 FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR  1991

                         VETERANS ADMINISTRATION                 VETERANS ADMINISTRATION
                PROJECT IDENTIFICATION
                     REG)    EST    PROJECT
  BUDGET     COMPL   COMPL  COMPL  ASSESS- MEDIA
(THOUSANDS)   STATUS  DATE    DATE   MENT    TYPE
                                                                                                                     VA-38
    ADEQUACY OF PROJECT
  ENGIN-
  EERING    TIME      COST
WA-360010333 PROJECT: 668901130
CORRECT UG TANK DEFICIENCIES
ACCT: OTHER
V A MEDICAL CENTER
SPOKANE                          WA

WI-360010340 PROJECT: 676891020
ASBESTOS BASELINE SURVEY
ACCT: OTHER
VA MEDICAL CENTER
TOMAH                            HI

WI-360010340 PROJECT: 676901040
REMOVE ASBESTOS
ACCT: OTHER
VA MEDICAL CENTER
TOMAH                            HI

WI-360010354 PROJECT: 695901020
ASBESTOS EXPOSURE ASSESSMENT
ACCT: OTHER
VA MEDICAL CENTER
MILWAUKEE                        HI

WI-360010354 PROJECT: 695901030
UPGRADE INCINERATOR
ACCT: OTHER
VA MEDICAL CENTER
MILWAUKEE                        WI

WI-360010354 PROJECT: 695881120
REPL HOT WATER TANKS
ACCT: OTHER
VA MEDICAL CENTER
MILWAUKEE                        WI
             ESDF
       18.0   OTHR
       65.0   OTHR
       30.0  OTHR
       28.0   OTHR
      177.0  OTHR
                           90/09  MEDIUM   SOLID
                                         WASTE
                           90/09  MEDIUM    AIR
                           90/09 MEDIUM    AIR
                           90/09 MEDIUM    AIR
                           90/09 MEDIUM    AIR
                           90/09 MEDIUM   WATER
ADEQUATE  ADEQUATE   ADEQUATE
 DESIGN    TIMING    ESTIMATE
                                                    NOT
                                                   AVAIL
                                                    NOT
                                                   AVAIL
            NOT
           AVAIL
            NOT
           AVAIL
                                                  ADEQUATE  ADEQUATE
                                                   DESIGN    TIMING
                                                    NOT
                                                   AVAIL
                                                    NOT
                                                   AVAIL
            NOT
           AVAIL
            NOT
           AVAIL
 NOT
AVAIL
 NOT
AVAIL
                     ADEQUATE
                     ESTIMATE
 NOT
AVAIL
 NOT
AVAIL

-------
                                  FEDERAL AGENCY POLLUTION  ABATEMENT PLAN FOR FISCAL YEAR 1991

                          VETERANS ADMINISTRATION                VETERANS ADMINISTRATION
                 PROJECT IDENTIFICATION
                     REQ    EST    PROJECT
  BUDGET     COMPL   COMPL   COMPL  ASSESS- MEDIA
(THOUSANDS)   STATUS   DATE    DATE   MENT    TYPE
                                                                     VA-39
                            ADEQUACY OF  PROJECT
                          ENGIN-
                          EERING    TIME      COST
 WV-360007276 PROJECT:  517821030
 REPL. CENT. VACUUM t HOT WTR TAN
 ACCT: OTHER
 VAMC BECKLEY
 BECKLEY                          WV

 WV-360007276 PROJECT:  517681030
 GROUNDS UPGRADE
 ACCT: OTHER
 VAMC BECKLEY
 BECKLEY                          WV

 WV-360007301 PROJECT:  613861070
 IMPROVE SITE DRAINAGE
 ACCT:  OTHER
 VA  MEDICAL  CENTER
 MARTINSBURG                      WV

 WV-360010255 PROJECT:  540901010
 REPLACE  PCB TRANSFORMER
 ACCT:  OTHER
 V A  MEDICAL CENTER
 CLARKSBURG                        WV

 WV-360010255  PROJECT:  540881090
 REPLACE ASBESTOS ROOF
 ACCT:  OTHER
 V A  MEDICAL  CENTER
 CLARKSBURG                        WV

WV-360010255  PROJECT:  540871010
REPLACE INCINERATOR
ACCT: OTHER
V A MEDICAL CENTER
CLARKSBURG                       WV
      119.0   OTHR
       93.0   OTHR
      201.0   OTHR
      182.0   ESDF
      83.0  OTHR
      180.0  OTHR
                           90/09 MEDIUM   SOLID
                                         WASTE
                           90/09 MEDIUM   SOLID
                                         WASTE
                           90/09 MEDIUM   WATER
90/09 MEDIUM    AIR
                          90/09 MEDIUM    AIR
                          90/09 MEDIUM    AIR
                          NOT
                         AVAIL
                          NOT
                         AVAIL
                                                    NOT
                                                   AVAIL
                                                    NOT
                                                   AVAIL
                                                    NOT
                                                   AVAIL
 NOT
AVAIL
 NOT
AVAIL
                                    NOT
                                   AVAIL
                                    NOT
                                   AVAIL
                                    NOT
                                   AVAIL
 NOT
AVAIL
 NOT
AVAIL
            NOT
           AVAIL
            NOT
           AVAIL
            NOT
           AVAIL
                                                  ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE

-------
                                 FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR  1991

                         VETERANS ADMINISTRATION                 VETERANS ADMINISTRATION
                                                                     VA-40
                PROJECT IDENTIFICATION
                     REG)    EST   PROJECT
  BUDGET     COMPL   COMPL  COMPL  ASSESS-  MEDIA
(THOUSANDS)   STATUS  DATE    DATE   MENT     TYPE
                            ADEQUACY OF PROJECT
                          ENGIN-
                          EERING    TIME      COST
WV-360010255 PROJECT: 540871090
REMOVE ASBESTOS
ACCT: OTHER
V A MEDICAL CENTER
CLARKSBURG                       WV

WV-360Q10255 PROJECT: 54090101
REPLACE PCB TRANSFORMER
ACCT: OTHER
V A MEDICAL CENTER
CLARKSBURG                       WV

WV-360010284 PROJECT: 561861060
RPL WATER MAINS
ACCT: OTHER
V A MEDICAL CENTER
HUNTINGTON                       WV

WV-360010284 PROJECT: 581881200
REPL SANITARY LINES
ACCT: OTHER
V A MEDICAL CENTER
HUNTINGTON                       WV
       40.0  OTHR
       92.0  ESDF
      110.0  OTHR
      117.0  OTHR
                           90/09 MEDIUM     AIR
                                                    NOT
                                                   AVAIL
                                    NOT
                                   AVAIL
90/09 MEDIUM   WATER      NOT       NOT
                         AVAIL     AVAIL
                           90/09 MEDIUM   WATER
                                                    NOT
                                                   AVAIL
                                   NOT
                                  AVAIL
 NOT
AVAIL
                           90/09 MEDIUM   TOXIC    ADEQUATE  ADEQUATE   ADEQUATE
                                        SUBSTANCE   DESIGN    TIMING    ESTIMATE
                                                                         NOT
                                                                        AVAIL
 NOT
AVAIL
WY-360010354 PROJECT: 695851130
ASBESTOS ABATEMENT B-6 / B-102
ACCT: OTHER
VAMC MILWAUKEE
MILWAUKEE                        WY
                                                      680.0  OTHR
                           90/09 MEDIUM    AIR
                                                  ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
      TOTAL, VETERANS ADMINISTRATION
              55,865.3
                                                                                           203
      TOTAL, VETERANS ADMINISTRATION
              55,865.3
                                                                                           203

-------
GSA

-------
GENERAL SERVICES
 ADMINISTRATION
       GENERAL SERVICES
       ADMINISTRATION •£?•

-------
                                                       GSA-1
GENERAL SERVICES ADMINISTRATION

The General Services Administration (GSA) has 1,069
installations, and manages 14,842 acres of land.  In addition, GSA
owns 2,598 buildings comprising 211,009,786 square feet of floor
area. This makes GSA the largest Federal real property owner,
with more than twice the number of square feet of building space
than the next largest civilian agency.

The General Services Administration provides the Federal
Government a system for managing property and records,
construction and operation of buildings, distribution and
warehousing of supplies, disposal of property, transportation and
maintenance and stockpiling of strategic materials. GSA also
administers a number of Federal Information Centers. The Public
Buildings Service is responsible for the design, building or
leasing, repair, operation, protection and maintenance of most of
the federally controlled buildings in the nation.

AGENCY POLLUTION ABATEMENT PLAN FOR FY 1991

GSA proposed only one project totalling $75,000 in their 1991
environmental plan. EPA is currently working with the Office of
Safety and Environmental Management in GSA to assist them in
identifying potential projects for inclusion in the A-106
reporting process. EPA has also volunteered to assist GSA in
training agency staff in the A-106 reporting process.

EPA evaluated the project contributed by GSA, and categorized it
according to its potential impact on the local environment if the
project were not funded in FY 1991. EPA rated this project
(budgeted at $75,000) as having a "Medium" environmental impact.
This project is a Class I RCRA project, for which a compliance
deadline has already passed.

-------
                                                                                    GSA-2
                       TOTAL NUMBER OF POLLUTION ABATEMENT

                        PROJECTS PROPOSED FOR FY 1987 - 91

                          GENERAL SERVICES ADMINISTRATION
   w

   o
   Ul

   o
   
-------
                                                                                     GSA-
                           TOTAL DOLLARS REQUESTED FOR POLLUTION

                            ABATEMENT PROJECTS FOR FY 1987 - 91

                              GENERAL SERVICES ADMINISTRATION
       200000 -
   o
   o
   o
   CO
   K
   O
   Q
        100000 -
                  FY87
FY88
FY89
                                                                           FY91
GSA FIG 2
           RSCAL YEARS

-------
                                                                                    GSA-4
                     TOTAL NUMBER AND DOLLARS PROPOSED FOR
                      POLLUTION ABATEMENT NEEDS FOR FY 1991
                        GENERAL SERVICES ADMINISTRATION
      .01
            10
100
1000
GSA FIG 3
PROJECTS

DOLLARS ($000)

-------
                                                                                         GSA-5
                        TOTAL NUMBER AND DOLLARS PROPOSED FOR
                          CLASS I, II, III PROJECTS FOR FY 1991
                           GENERAL SERVICES ADMINISTRATION
       CLASS I
       CLASS II
       CLASS I
                    NONE
                             20
     40
60
80
GSAFIG4
PROJECTS

DOLLARS ($000)

-------
                                                                                GSA-6
GSA  - TABLE 1: EPA EVALUATION OF THE ENVIRONMENTAL IMPACT OF PROPOSED
                POLLUTION ABATEMENT PROJECTS FOR FISCAL YEAR 1991
                INCLUDING NUMBER AND COST
                      GENERAL SERVICES ADMINISTRATION
COMPLIANCE *
STATUS

ESDP
GRAND TOTAL
HIGH
PROJECTS
COST
($1,000)
0
0.0
0
0.0
MEDIUM
PROJECTS
COST
($1,000)
1
75.0
1
75.0
LOW
PROJECTS
COST
($1,000)
0
0.0
0
0.0
TOTAL
PROJECTS
COST
($1,000)
1
75.0
1
75.0
SEE SECTION III FOR  DEFINITIONS OF COMPLIANCE STATUS CATEGORIES

-------
                                                                                                                          GSA-7
        GSA   -   TABLE 2:
                          NUMBER AND  DOLLAR  AMOUNT  OF  POLLUTION ABATEMENT  PROJECTS  FOR FEDERAL INSTALLATIONS
                          PROPOSED  BY MAJOR  COMMAND/BUREAU  FOR FISCAL  YEAR  1991 BY  CLASS/COMPLIANCE STATUS.*

                                          GENERAL SERVICES  ADMINISTRATION
MAJOR COMMAND/
BUREAU CMPA
PROJECTS
COST
($1,000)
PUBLIC BLDGS
SERV
TOTAL
CLASS I
INOV
PROJECTS
COST
($1,000)


ESDP
PROJECTS
COST
($1,000)
1
75.0
1
75.0
CLASS
ESDF
PROJECTS
COST
($1,000)


	
II
PSDF
PROJECTS
COST
($1,000)


ESRO
PROJECTS
COST
($1,000)


CLASS III
ESRE ESDL OTHR
PROJECTS PROJECTS PROJECTS
COST COST COST
($1,000) ($1,000) ($1,000)


TOTAL
PROJECTS
COST
($1,000)
1
75.0
1
75.0
« SEE SECTION III FOR DEFINITIONS OF COMPLIANCE STATUS CATEGORIES

-------
                                                                                                                    GSA-8
              SSA  - TABLE 3: NUMBER AND DOLLAR AMOUNT OF POLLUTION ABATEMENT PROJECTS PROPOSED BY
                              MAJOR COMMAND/BUREAU AND ENVIRONMENTAL MEDIA FOR FISCAL  YEAR  1991

                                              GENERAL SERVICES ADMINISTRATION

MAJOR COMMAND/         DRINKING
BUREAU         AIR      WATER      NOISE  PESTICIDES RADIATION  CERCLA     RCRA     TSCA     WATER     MULTI     TOTAL

             PROJECTS  PROJECTS  PROJECTS  PROJECTS  PROJECTS  PROJECTS  PROJECTS  PROJECTS  PROJECTS  PROJECTS  PROJECTS
               COST      COST      COST      COST      COST      COST      COST     COST      COST      COST      COST
             ($1,000)  ($1,000)  ($1,000)  ($1,000)  ($1,000)  ($1,000)  ($1,000)  ($1,000)  ($1,000)  ($1,000)  ($1,000)

PUBLIC BLDGS                                                                  1                                      1
SERV                                                                         75.0                                   75.0

TOTAL                                                                         1                                      1
                                                                            75.0                                    75.0

-------
                                 FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR  1991

                         GENERAL SERVICES ADMIN                  PUBLIC BUILDINGS SERVICE-FBF
                PROJECT IDENTIFICATION
                     REQ     EST    PROJECT
  BUDGET     COMPL    COMPL   COMPL  ASSESS- MEDIA
(THOUSANDS)   STATUS   DATE    DATE   MENT    TYPE
                                                                                                                     GSA-9
    ADEQUACY OF PROJECT
  ENGIN-
  EERING    TIME      COST
TX-471500224 PROJECT: P07ZZZ0340
REMOVE / UPGRADE UNDERGROUND STORAGE TANKS
ACCT: FEDERAL BUILDING FUND
GSA REGION 7
FORT WORTH                       TX

*     TOTAL, PUBLIC BUILDINGS SERVICE-FBF
       75.0   ESDP   8S/12   90/09 MEDIUM   SOLID
                                         WASTE
                                                                  75.0
ADEQUATE  ADEQUATE   ADEQUATE
 DESIGN    TIMING    ESTIMATE
      TOTAL, GENERAL SERVICES ADMIN
                                                                  75.0

-------
TVA

-------
TENNESSEE VALLEY
   AUTHORITY

-------
                                                       TVA-1
TENNESSEE VALLEY AUTHORITY

The Tennessee Valley Authority (TVA) owns 238 installations
covering over 1 million acres. TVA also owns 528 buildings which
include more than 3.5 million square feet of floor area. TVA is a
wholly owned corporation of the US government. It conducts
resource development for the Tennessee Valley region. Its
programs include flood control, navigation development, electric
power production, fertilizer development, recreation, forestry
and wildlife development. Its installations include power plants,
dams, laboratories, training centers, and natural resource
management and administrative facilities.

AGENCY POLLUTION ABATEMENT PLAN FOR FY 1991

TVA proposed seven projects totalling $5.7 million for their FY
1991 environmental plan.

EPA evaluated each project contributed by TVA in their
environmental plan and categorized them according to the
potential impact on the local environment if the projects were
not funded in FY 1991. EPA rated all seven of TVA's projects as
having "High" environmental impact.

The distribution of projects among compliance classes in the FY
1991 plan for TVA indicates that there are 6 Class I projects,
those in the plan for current compliance purposes, or 86 percent
of the total number of projects in the FY 1991 plan. The one
Class II project, in the plan to permit the agency to meet a
near-term future compliance deadline, constituted 14 percent of
the total.  There were no Class III projects in the plan.

The projects proposed by TVA in their FY 1991 plan are
distributed across the various environmental media programs in
the following pattern: one project in the air area, costing $4.6
million; 4 projects in the RCRA area, costing $750,000; and 2
water projects, costing a total of $312,000.

-------
                                                                     TVA-2
                   TOTAL NUMBER OF POLLUTION ABATEMENT

                    PROJECTS PROPOSED FOR FY 1987 - 91

                       TENNESSEE VALLEY AUTHORITY
     w
     tu
     •?
     O
     
-------
                                                                            TVA-3
                            TOTAL DOLLARS REQUESTED FOR POLLUTION

                            ABATEMENT PROJECTS FOR FY 1987 - 91

                                TENNESSEE VALEY AUTHORITY
           40000
           30000 -
   o
   o
   o
   (0
   oc
   O
   a
20000 -
           10000-
                      CM
                     FY87
                       o
                       (O
                       o
                      FY88
                                               co
TVA FIG 2
    FY89



RSCAL YEARS
FY90
FY91

-------
                                                                                       TVA-4
                    TOTAL NUMBER AND DOLLARS PROPOSED FOR
                     POLLUTION ABATEMENT NEEDS FOR FY 1991
                         TENNESSEE VALLEY AUTHORITY
                                                             5704
                     10
100
1000
10000
100000
TVAFIG3
     PROJECTS

    DOLLARS ($000)

-------
                                                                                         TVA-5
                         TOTAL NUMBER AND DOLLARS PROPOSED FOR
                           CLASS I, II, III PROJECTS FOR FY 1991
                              TENNESSEE VALLEY AUTHORITY
        CLASS I
                           1062
        CLASS II
                                                                      4642
        CLASS III
                NONE
                                   	1—
                                    2000
              	1	
               4000
	1	
 1000
3000
	1	
 5000
                                                                                    6000
TVAFIG4
PROJECTS

DOLLARS ($000)

-------
                                                                                   TVA-6
   TVA  - TABLE 1: EPA EVALUATION OF THE ENVIRONMENTAL IMPACT OF PROPOSED
                   POLLUTION ABATEMENT PROJECTS FOR FISCAL YEAR 1991
                   INCLUDING NUMBER AND COST
                         TENNESSEE VALLEY AUTHORITY
COMPLIANCE *
STATUS

INOV
ESDP
PSDF
GRAND TOTAL
HIGH
PROJECTS
COST
($1,000)
4
750.0
2
312.0
1
4,642.0
7
5,704.0
MEDIUM
PROJECTS
COST
($1,000)
0
0.0
0
0.0
0
0.0
0
0.0
LOW
PROJECTS
COST
($1,000)
0
0.0
0
0.0
0
0.0
0
0.0
TOTAL
PROJECTS
COST
($1,000)
4
750.0
2
312.0
1
4,642.0
7
5,704.0
*  SEE SECTION III FOR  DEFINITIONS OF COMPLIANCE STATUS CATEGORIES

-------
       TVA   -   TABLE  2:
                          NUMBER  AND  DOLLAR  AMOUNT OF  POLLUTION  ABATEMENT PROJECTS FOR FEDERAL INSTALLATIONS
                          PROPOSED BY MAJOR  COMMAND/BUREAU  FOR FISCAL  YEAR  1991 BY CLASS/COMPLIANCE STATUS.*

                                          TENNESSEE VALLEY  AUTHORITY
                                                                                                                          TVA-7
MAJOR COMMAND/
BUREAU CMPA
PROJECTS
COST
($1,000)
TN VALLEY
AUTHORITY
TOTAL

CLASS I
INOV
PROJECTS
COST
($1,000)
4
750.0
4
750.0

ESDP
PROJECTS
COST
($1,000)
2
312.0
2
312.0
CLASS
ESDF
PROJECTS
COST
($1,000)




	
II
PSDF
	
PROJECTS
COST
($1,000)
1
4, 642.0
1
4,642.0
CLASS
ESRO ESRE
PROJECTS PROJECTS
COST COST
($1,000) ($1,000)




	
Ill
ESDL OTHR
	
PROJECTS PROJECTS
COST COST
($1,000) ($1,000)





TOTAL
PROJECTS
COST
($1,000)
7
5,704.0
7
5,704.0
* SEE SECTION III FOR DEFINITIONS OF COMPLIANCE STATUS CATEGORIES

-------
                                                                                                       TVA-8
TVA  - TABLE 3: NUMBER AND DOLLAR AMOUNT OF POLLUTION ABATEMENT PROJECTS PROPOSED BY
                MAJOR COMMAND/BUREAU AND ENVIRONMENTAL MEDIA FOR FISCAL YEAR 1991

                                TENNESSEE VALLEY AUTHORITY
MAJOR COMMAND/
BUREAU AIR

TN VALLEY
AUTHORITY
TOTAL
PROJECTS
COST
($1,000)
1
4642.0
1
4642.0
DRINKING
WATER
PROJECTS
COST
($1,000)


NOISE
PROJECTS
COST
($1,000)


PESTICIDES
PROJECTS
COST
($1,000)


RADIATION
PROJECTS
COST
($1,000)


CERCLA
PROJECTS
COST
($1,000)


RCRA
PROJECTS
COST
($1,000)
4
750.0
4
750.0
TSCA
PROJECTS
COST
($1,000)


WATER
PROJECTS
COST
($1,000)
2
31Z.O
2
312.0
MULTI
PROJECTS
COST
($1,000)


TOTAL
PROJECTS
COST
($1,000)
7
5704.0
7
5704.0

-------
                                  FEDERAL AGENCY  POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                          TENNESSEE  VALLEY AUTHORITY              TENNESSEE VALLEY AUTHORITY
                 PROJECT IDENTIFICATION
                    REQ    EST   PROJECT
  BUDGET     COMPL   COMPL  COMPL ASSESS- MEDIA
(THOUSANDS)   STATUS  DATE   DATE  MENT    TYPE
                                                                                                                      TVA-9
    ADEQUACY OF PROJECT
  ENGIN-
  EERING    TIME      COST
 AL-640006675 PROJECT:  PWR-73
 ELECTROSTATIC PRECIPITATORS
 ACCT:  FEDERAL BUILDING FUND
 COLBERT STEAM PLANT
 PRIDE
    4,642.0   PSDF    91/02  90/09  HIGH     AIR
ADEQUATE  ADEQUATE   ADEQUATE
 DESIGN    TIMING    ESTIMATE
                                 AL
 AL-640006749 PROJECT:  CHM-90
 AMMONIA  FROM COAL  PROJECT CHEMICAL CLEANUP
 ACCT:  FEDERAL BUILDING FUND
 CHEMICAL PLANT - MUSCLE SHOALS
 MUSCLE SHOALS                   AL

 AL-640006749 PROJECT:  CHM-91
 CHEMICAL PLANT ENVIRONMENTAL CLEANUP
 ACCT: FEDERAL BUILDING FUND
 CHEMICAL PLANT - MUSCLE SHOALS
 MUSCLE SHOALS                   AL

 AL-640006749  PROJECT:  CHM-93
 DRUM CLEANUP
 ACCT: FEDERAL BUILDING FUND
 CHEMICAL PLANT  - MUSCLE SHOALS
 MUSCLE SHOALS                   AL

 AL-640006749  PROJECT: CHM-94
 ABANDONED CHEMICALS CHLEANUP (I)
 ACCT: FEDERAL BUILDING FUND
 CHEMICAL PLANT  - MUSCLE SHOALS
 MUSCLE SHOALS                    AL

 AL-640036013  PROJECT: 071
RECLAMATION OF COAL PREPARATION PLANT
ACCT: FEDERAL BUILDING FUND
 FABIUS COAL PREPARATION PLANT
FABIUS                           AL
      200.0   INOV
      300.0  INOV
      200.0  INOV
      50.0  INOV
                          90/09  HIGH    SOLID
                                         WASTE
                          90/09  HIGH
                          90/09  HIGH
                          90/09  HIGH
     155.0  ESDP   93/05  90/09  HIGH
                                         SOLID
                                         HASTE
                                         SOLID
                                         HASTE
                                         SOLID
                                         HASTE
                                         WATER
  NOT
 AVAIL
 NOT
AVAIL
ADEQUATE  ADEQUATE
 DESIGN    TIMING
ADEQUATE  ADEQUATE
 DESIGN    TIMING
  NOT
 AVAIL
 NOT
AVAIL
                                                  ADEQUATE  OVERDUE
                                                   DESIGN    TIMING
 NOT
AVAIL
          ADEQUATE
          ESTIMATE
          ADEQUATE
          ESTIMATE
 NOT
AVAIL
                     ADEQUATE
                     ESTIMATE

-------
                                 FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR  FISCAL YEAR  1991

                         TENNESSEE VALLEY AUTHORITY              TENNESSEE  VALLEY  AUTHORITY
                PROJECT IDENTIFICATION
AL-640036103 PROJECT: 072
COAL MINED LAND RECLAMATION
ACCT: FEDERAL BUILDING FUND
FABIUS MINES
FABIU3                           AL

«     TOTAL, TENNESSEE VALLEY AUTHORITY
      TOTAL, TENNESSEE VALLEY AUTHORITY
                     REQ    EST    PROJECT
  BUDGET     COMPL   COMPL  COMPL  ASSESS- MEDIA
(THOUSANDS)   STATUS  DATE   DATE   MENT    TYPE
      157.0  ESDP   93/05  90/09  HIGH    WATER





               5,704.0                       7


               5,704.0                       7
                                                                                                                     TVA-10
    ADEQUACY OF PROJECT
  ENGIN-
  EERING    TIME      COST
ADEQUATE  OVERDUE    ADEQUATE
 DESIGN    TIMING    ESTIMATE

-------
EPA

-------
ENVIRONMENTAL
  PROTECTION
   AGENCY

-------
                                                       EPA-1
ENVIRONMENTAL PROTECTION AGENCY

The Environmental Protection Agency (EPA)  owns 22 installations
across the country, encompassing 203 acres. Its 76 buildings
include 1,042,590 square feet of floor area. Most of this space
is devoted to laboratory and administrative activities.

AGENCY POLLUTION ABATEMENT PLAN FOR FY 1991

EPA proposed ten projects totalling $2.6 million for their FY
1991 environmental plan.

Each project was evaluated according to the impact on the local
environment that would result if the project were not funded in
FY 1991.  Eight projects were rated as having a "High"
environmental impact (budgeted at $2.5 million).  "Medium"
ratings were assigned to two projects ($105,000 budgeted) and no
projects were rated as having "Low" environmental impact.

The distribution of projects among compliance classes indicates
that there are 5 Class I projects, those in the plan for current
compliance reasons, or 50 percent of the total projects in the FY
1991 plan.  The 5 Class II projects, those in the plan to permit
the agency to meet near-term compliance deadlines make up the
other 50 percent of the total.

The projects proposed by EPA in the FY 1991 plan are distributed
across the various environmental media programs in the following
pattern:  one radiation project costing $60,000; 6 projects in
the RCRA area, totalling $1.6 million; and 3 projects in the
water area, costing $935,000.

-------
                         TOTAL NUMBER OF POLLUTION ABATEMENT
                           PROJECTS PROPOSED FOR FY 1987 - 91
                           ENVIRONMENTAL PROTECTION AGENCY
  (0
  UJ
  O
  cc
  Q.
                FY87
FY88
    FY89

RSCALYEARS
                                                          FY90
FY91
EPA FIG 1

-------
                        TOTAL DOLLARS REQUESTED FOR POLLUTION

                         ABATEMENT PROJECTS FOR FY 1987 - 91

                          ENVIRONMENTAL PROTECTION AGENCY
       3000
        2000-
   o
   o
   o
   (0
   oc
   O
   Q
        1000-
                 FY87
FY88
FY89
FY90
FY91
                                         RSCAL YEARS
EPA FIG 2

-------
                    TOTAL NUMBER AND DOLLARS PROPOSED FOR
                    POLLUTION ABATEMENT NEEDS FOR FY 1991
                       ENVIRONMENTAL PROTECTION AGENCY
                                                                        2625
         .1
10
100
1000
10000
EPA FIG 3
   PROJECTS

  DOLLARS ($000)

-------
                      TOTAL NUMBER AND DOLLARS PROPOSED FOR
                        CLASS I, II, III PROJECTS FOR FY 1991
                         ENVIRONMENTAL PROTECTION AGENCY
    CLASS I
   CLASS II
   CLASS III
                                               100
                       1000
10000
EPA FIG 4
PROJECTS

DOLLARS ($000)

-------
                                                                                   EPA-6
   EPA  - TABLE 1: EPA EVALUATION OF THE ENVIRONMENTAL IMPACT OF PROPOSED
                   POLLUTION ABATEMENT PROJECTS FOR FISCAL YEAR 1991
                   INCLUDING NUMBER AND COST
                         ENVIRONMENTAL PROTECTION AGENCY
COMPLIANCE *
STATUS

ESDP

ESDF

PSDF

GRAND TOTAL

HIGH
PROJECTS
COST
($1,000)
5
1,800.0
2
95.0
1
625.0
8
2,520.0
MEDIUM
PROJECTS
COST
($1)000)
0
0.0
2
105.0
0
0.0
2
105.0
LOW

PROJECTS
COST
($1,000)

0

0

0

0
0
.0
0
.0
0
.0
0
.0
TOTAL
PROJECTS
COST
($1,000)
5
1,800.0
4
200.0
1
625.0
10
2,625.0
*  SEE SECTION III FOR  DEFINITIONS OF COMPLIANCE STATUS CATEGORIES

-------
      EPA   -   TABLE  2:
NUMBER AND DOLLAR AMOUNT OF POLLUTION ABATEMENT PROJECTS FOR  FEDERAL  INSTALLATIONS
PROPOSED BY MAJOR COMMAND/BUREAU FOR FISCAL YEAR 1991  BY CLASS/COMPLIANCE  STATUS.*

                ENVIRONMENTAL PROTECTION AGENCY
                                                                                                                        EPA-7
MAJOR
BUREAU

USEPA
TOTAL
COMMAND/
CMPA
PROJECTS
COST
($1,000)


CLASS I
INOV
PROJECTS
COST
($1,000)


	
ESDP
PROJECTS
COST
1*1,000)
5
1 ,800.0
5
1,800.0
CLASS
ESDF
PROJECTS
COST
($1,000)
_ 	 	
4
200.0
^ 	
<+
200.0
II
PSDF
	 	
PROJECTS
COST
($1,000)
1
625.0
	 	
1
625.0
ESRO
PROJECTS
COST
($1,000)


CLASS
ESRE
PROJECTS
COST
($1,000)


III
ESDL
PROJECTS
COST
($1,000)


	
OTHR
	
PROJECTS
COST
($1,000)
	
	 	
TOTAL
PROJECTS
COST
($1,000)
10
2,625.0
10
2,625.0
SEE SECTION III FOR DEFINITIONS OF COMPLIANCE STATUS CATEGORIES

-------
                                                                                                       EPA-8
EPA  - TABLE 3: NUMBER AND DOLLAR AMOUNT OF POLLUTION ABATEMENT PROJECTS PROPOSED BY
                MAJOR COMMAND/BUREAU AND ENVIRONMENTAL MEDIA FOR FISCAL YEAR 1991

                                ENVIRONMENTAL PROTECTION AGENCY
MAJOR
BUREAU

USEPA
TOTAL
COMMAND/
AIR
PROJECTS
COST
($1,000)


DRINKING
WATER
PROJECTS
COST
($1,000)


NOISE
PROJECTS
COST
($1,000)


PESTICIDES
PROJECTS
COST
($1,000)


RADIATION
PROJECTS
COST
($1,000)
1
60.0
1
60.0
CERCLA
PROJECTS
COST
($1,000)


RCRA
PROJECTS
COST
($1,000)
6
1630.0
6
1630.0
TSCA
PROJECTS
COST
($1,000)


WATER
PROJECTS
COST
($1,000)
3
935.0
3
935.0
MULTI
PROJECTS
COST
($1,000)


TOTAL
PROJECTS
COST
($1,000)
10
2625.0
10
2625.0

-------
                                  FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR  FISCAL YEAR 1991

                          ENVIRONMENTAL PROTECTION AGENCY         ENVIRONMENTAL  PROTECTION AGENCY
                 PROJECT IDENTIFICATION
                    REQ    EST   PROJECT
  BUDGET     COMPL   COMPL  COMPL ASSESS- MEDIA
(THOUSANDS)   STATUS  DATE   DATE  MENT    TYPE
                                                                     EPA-9
    ADEQUACY OF  PROJECT
  ENGIN-
  EERING    TIME      COST
 AL-680030925 PROJECT: PA0408B901
 RADIUM STORAGE BLDG. REMEDIATION
 ACCT:
 EASTERN ENVIRONMENTAL RAD FAC
 MONTGOMERY                       AL

 DC-680099011 PROJECT: PA00098908
 WASTEWATER NEUTRALIZATION
 ACCT:
 EPA HEADQUARTERS
 WASHINGTON                       DC

 FL-680009338 PROJECT: PA04096909
 HAZARDOUS WASTE STORAGE BLDG.
 ACCT:
 ENVIRONMENTAL RESEARCH LAB
 GULF  BREEZE                       FL

 IL-680099010 PROJECT: PA05098910
 HAZARDOUS HASTE STORAGE BLDG.
 ACCT:
 REGIONAL  LABORATORY
 CHICAGO                           IL

 MA-680099003 PROJECT: PA01088904
 UST REPLACEMENT
 ACCT:
 ENVIRONMENTAL PROTECTION A6.
 LEXINGTON                         MA

MI-680032265 PROJECT: PA05068816
ALTERNATE FUELS DISPENSING SYSTEM
ACCT:
MVEL ANN ARBOR
ANN ARBOR                         MI
       60.0   ESDF
      860.0   ESDP
      690.0   ESDP
      150.0  ESDP
      50.0  ESDF
     635.0  PSDF
                    90/12  90/09  HIGH  RADIATION
                                 HIGH
                                 HIGH
                                 HIGH
                          90/09 MEDIUM
                                 HIGH
                                         WATER
                                         SOLID
                                         WASTE
                                         SOLID
                                         WASTE
                                         SOLID
                                         WASTE
                                         SOLID
                                         WASTE
                                                    NOT
                                                   AVAIL
                                                    NOT
                                                   AVAIL
  NOT
 AVAIL
  NOT
 AVAIL
  NOT
 AVAIL
            NOT
           AVAIL
            NOT
           AVAIL
 NOT
AVAIL
 NOT
AVAIL
 NOT
AVAIL
ADEQUATE  ADEQUATE
 DESIGN    TIMING
            NOT
           AVAIL
            NOT
           AVAIL
 NOT
AVAIL
 NOT
AVAIL
 NOT
AVAIL
          ADEQUATE
          ESTIMATE

-------
                                  FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                          ENVIRONMENTAL PROTECTION AGENCY         ENVIRONMENTAL PROTECTION AGENCY
                PROJECT  IDENTIFICATION
                     REQ     EST   PROJECT
  BUDGET     COMPL   COMPL   COMPL ASSESS- MEDIA
(THOUSANDS)  STATUS  DATE    DATE  MENT    TYPE
                                                                                                                     EPA-10
                           ADEQUACY OF PROJECT
                         ENGIN-
                         EERING    TIME      COST
MS-680099007 PROJECT: PA04088907
HAZARDOUS STORAGE BLDG. UPGRADE
ACCT:
US EPA ENV. CHEMISTRY LAB
BAY ST. LOUIS                    MS

NC-680031377 PROJECT: PA04096911
METHANOL STORAGE TANKS
ACCT:
ENVIROMENTAL RESEACH CENTER
RESEARCH TRIANGLE PARK           NC

NJ-6800199fl7 PROJECT: PA02587013
SANIARY SEWER EQUIPMENT MODERNIZATION
ACCT:
EPA-EDISON  LABS
EDISON                           NJ

NV-680030928 PROJECT: PA09088905
HASTEMATER  PRETREATMENT
ACCT:
EMSL-ORD
LAS VEGAS                        NV

*     TOTAL, ENVIRONMENTAL PROTECTION  AGENCY
      TOTAL,  ENVIRONMENTAL PROTECTION AGENCY
       60.0  ESDP
       55.0  ESDF
       35.0  ESDF
       40.0  ESDP
                           90/09  HIGH    SOLID
                                         WASTE
                         NOT       NOT
                        AVAIL     AVAIL
               2,625.0


               2,625.0
                                MEDIUM   SOLID      NOT       NOT
                                         WASTE     AVAIL     AVAIL
 NOT
AVAIL
                                              NOT
                                             AVAIL
90/09  HIGH    WATER    ADEQUATE  ADEQUATE   ADEQUATE
                        DESIGN    TIMING    ESTIMATE
90/09  HIGH    WATER    ADEQUATE  ADEQUATE   ADEQUATE
                        DESIGN    TIMING    ESTIMATE
                                           10
                                                                                            10

-------
DOT

-------
DEPARTMENT OF
TRANSPORTATION

-------
                                                       DOT-1
THE DEPARTMENT OF TRANSPORTATION

The Department of Transportation (DOT) owns 12,130 installations,
and manages 142,263 acres of land.  DOT also owns 12,042
buildings, comprising about 34 million square feet of floor area.
There are several major sub-elements within the Department
reflected in the Agency Environmental Plan. These include the US
Coast Guard, the Federal Aviation Administration, the Federal
Highway Administration, the Federal Railroad Administration and
the Maritime Administration.

AGENCY POLLUTION ABATEMENT PLAN FOR FY 1991

DOT proposed 174 projects, totalling $68.7 million in the FY 1991
plan.

The US Coast Guard (USCG) proposed 22 projects, costing $21.4
million; the Federal Aviation Administration (FAA) included 143
projects, totalling $46.7 million;  the Federal Highway
Administration  (FHWA) had two projects costing $11,000; the
Federal Railroad Administration (FRA) contributed three projects
totalling $423,000; the Maritime Administration included three
projects costing $14,000; and the Office of the Secretary
contributed one project costing $6,000.

EPA evaluated each project contributed by DOT to their
environmental plan and categorized them according to the
potential impact on the local environment that would occur if the
project were not funded in FY 1991. EPA rated 29 projects as
having a "High" environmental impact  (budgeted at $27.4 million).
"Medium" ratings were assigned to 138 projects ($40.7 million)
and 6 projects were rated as having relatively "Low"
environmental impacts  ( $202,000).

The distribution of projects among compliance classes for DOT
indicates that there are 20 Class I projects, those in the plan
for current compliance reasons, or 11.5 percent of the total
number of projects in the FY 1991 plan. The 134 Class II
projects, those in the plan to allow the agency to meet near-term
future compliance deadlines, make up 77 percent of the total. And
the 20 Class III projects, those in the plan for other
environmental reasons, make up 11.5 percent of the total.

The projects proposed by DOT in their FY 1991 plan are
distributed across the various environmental media programs in
the following pattern: 6 projects in the air compliance area,
costing $2 million; 3 drinking water projects, costing j$650,000;
44 Superfund projects costing $15.9 million; 82 RCRA projects
costing $32 million; 23 TSCA projects costing $6.6 million; and
16 Water projects, costing $10.3 million.

-------
                                                                         DOT-2
                    TOTAL NUMBER OF POLLUTION ABATEMENT
                       PROJECTS PROPOSED FOR FY 1987 -91
                          DEPT OF TRANSPORTATION
     200
  O
  
-------
                                                                                         DOT-3
                    TOTAL DOLLARS REQUESTED FOR POLLUTION

                      ABATEMENT PROJECTS FOR FY 1987 - 91

                          DEPT OF TRANSPORTATION
     80000-
     60000 -
 o
 o
 o
 to
 oc
 O
 Q
     40000-
     20000-
        04—
                 o>
                 o
                 at
                FY87
FY88
                                              FY89
FY90
                                                                             FY91
                                           RSCAL YEARS
DOT FIG 2

-------
                                                                                          DOT-4
BUREAU
     MARITIME ADMIN
   FED RAILROAD ADMIN
   FED HIGHWAY ADMIN
   FED AVIATION ADMIN
     US COAST GUARD
        OFCOFSCTY
                             TOTAL NUMBER AND DOLLARS PROPOSED FOR
                               POLLUTION ABATEMENT NEEDS FOR FY 1991
                                      DEPT OF TRANSPORTATION
DOT FIG 3
100         1000

   E3  PROJECTS

   •  DOLLARS ($000)
                                                             10000       100000      1000000

-------
                                                                                          DOT-5
                             TOTAL NUMBER AND DOLLARS PROPOSED FOR
                                CLASS I, II, III PROJECTS FOR FY 1991
                                      DEPT OF TRANSPORTATION
         CLASS I
         CLASS II
        CLASS
                            100
1000
10000
100000
1000000
DOT FIG 4
PROJECTS

DOLLARS ($000)

-------
                                                                                DOT-6
DOT  - TABLE 1: EPA EVALUATION OF THE ENVIRONMENTAL IMPACT OF PROPOSED
                POLLUTION ABATEMENT PROJECTS FOR FISCAL YEAR 1991
                INCLUDING NUMBER AND COST
                      DEPARTMENT OF TRANSPORTATION
COMPLIANCE *
STATUS

CMPA

INOV

ESDP

ESDF

PSDF

ESRO

ESRE

OTHR

GRAND TOTAL

HIGH
PROJECTS
COST
($1,000)
1
150.0
2
757.0
e
3,790.0
10
4,425.2
5
16,510.0
1
350.0
1
250.0
3
1,470.0
31
27,702.2
MEDIUM
PROJECTS
COST
($1,000)
0
0.0
1
500.0
8
2,822.0
115
34,675.6
3
40.0
4
215.2
1
250.0
5
2,238.0
137
40,740.8
LOW
PROJECTS
COST
($1,000)
0
0.0
0
0.0
0
0.0
0
0.0
1
1.0
3
100.2
0
0.0
2
100.6
6
201.8
TOTAL
PROJECTS
COST
($1,000)
1
150.0
3
1,257.0
16
6,612.0
125
39,100.8
9
16,551.0
8
665.4
2
500.0
10
3,808.6
174
68,644.8
SEE SECTION III FOR  DEFINITIONS OF COMPLIANCE STATUS CATEGORIES

-------
     DOT   -   TABLE  2:   NUMBER  AND DOLLAR AMOUNT OF  POLLUTION ABATEMENT PROJECTS FOR FEDERAL INSTALLATIONS
                        PROPOSED BY MAJOR COMMAND/BUREAU  FOR FISCAL YEAR 1991 BY CLASS/COMPLIANCE STATUS.*

                                        DEPARTMENT OF  TRANSPORTATION
                                                                                                                        DOT-7
MAJOR COMMAND/
BUREAU CMPA
PROJECTS
COST
($1,000)
OFC OF THE
SECRETARY
US COAST
GUARD
FED AVIATION 1
ADMIN 150.0
FED HIGHWAY
ADMIN
FED RAILROAD
ADMIN
MARITIME
ADMIN
TOTAL 1
150.0
CLASS I
INOV
PROJECTS
COST
($1,000)

1
500.0
I
500.0

1
257.0

3
1,257.0
ESDP
PROJECTS
COST
($1,000)

1
100.0
15
6,512.0



16
6,612.0
I 	
1 CLASS
ESDF
PROJECTS
COST
($1,000)
1
6.0
15
10,587.0
105
28,402.8

1
91.0
3
14.0
125
39,100.6
II
PSDF
PROJECTS
COST
($1,000)

__ 	 	
3
10,020.0
__
4
6,520.0
2
11.0


	
9
16,551.0
CLASS III
ESRO ESRE ESDL OTHR
	
PROJECTS PROJECTS PROJECTS PROJECTS
COST COST COST COST
($1,000) ($1,000) ($1,000) ($1,000)
	
	 , 	 , 	
2
240.0
	
52 10
350.4 500.0 3,808.6
	 	
	
1
75.0

82 10
665.4 500.0 3,808.6
TOTAL
PROJECTS
COST
($1,000)
1
6.0
22
21,447.0
143
46,743.8
2
11.0
3
423.0
3
14.0
174
68,644.8
SEE SECTION III FOR DEFINITIONS OF COMPLIANCE STATUS CATEGORIES

-------
                                                                                                                    DOT-8
              DOT  - TABLE 3: NUMBER AND DOLLAR AMOUNT OF POLLUTION ABATEMENT PROJECTS PROPOSED  BY
                              MAJOR COMMAND/BUREAU AND ENVIRONMENTAL MEDIA FOR FISCAL YEAR  1991
MAJOR COMMAND/
BUREAU         AIR
DRINKING
 WATER
                                              DEPARTMENT OF TRANSPORTATION
                                   NOISE  PESTICIDES RADIATION  CERCLA     RCRA
                                                                                     TSCA
                                                                                              WATER
                                                                                                       MULTI
                                                                                                                 TOTAL
             PROJECTS  PROJECTS  PROJECTS  PROJECTS  PROJECTS  PROJECTS  PROJECTS  PROJECTS   PROJECTS
               COST      COST      COST      COST      COST      COST      COST      COST      COST
             ($1,000)  ($1,000)  ($1,000)  ($1,000)  ($1,000)  ($1,000)  ($1,000)  ($1,000)   ($1,000)
                                                                               PROJECTS  PROJECTS
                                                                                 COST      COST
                                                                               ($1,000)  ($1,000)
OFC OF THE
SECRETARY
US COAST
GUARD
FED AVIATION 6 3
ADMIN 2029.0 650.0
FED HIGHWAY
ADMIN
FED RAILROAD
ADMIN
MARITIME
ADMIN
TOTAL 6 3
2029.0 650.0
1
6.0
3 2
2635.0 520.0
41 71
14295.0 23146.8
2
11.0
2
348.0
3
14.0
44 81
16930.0 24045.8

1 16
100.0 18192.0
21 1
6473.0 150.0

1
75.0

23 17
6648.0 18342.0
1
6.0
22
21447.0
143
46743.8
2
11.0
3
423.0
3
14.0
174
68644.8

-------
                                 FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR  FISCAL  YEAR  1991

                         DEPT OF TRANSPORTATION                  OFFICE OF THE  SECRETARY
                PROJECT IDENTIFICATION
                     REQ     EST   PROJECT
  BUDGET     COMPL   COMPL   COMPL ASSESS- MEDIA
(THOUSANDS)   STATUS   DATE    DATE  MENT    TYPE
                                                                                                                     DOT-9
                           ADEQUACY OF PROJECT
                          ENGIN-
                          EERING    TIME      COST
VA-690135878 PROJECT: MA002
UNDERGROUND STORAGE TANKS
ACCT: OTHER
JAMES RIVER RESERVE FLEET
FORT EUSTIS
                                 VA
        6.0  ESDF
90/09 MEDIUM   SOLID     ADEQUATE  ADEQUATE   ADEQUATE
               WASTE      DESIGN    TIMING    ESTIMATE
      TOTAL, OFFICE OF THE SECRETARY
                                                                   6.0

-------
                                 FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                         DEPT OF TRANSPORTATION                  UNITED STATES COAST GUARD
                PROJECT IDENTIFICATION
                     REQ    EST   PROJECT
  BUDGET     COMPL   COMPL  COMPL ASSESS-  MEDIA
(THOUSANDS)   STATUS  DATE   DATE   MENT     TYPE
                                                                     DOT-10
                            ADEQUACY  OF  PROJECT
                          ENGIN-
                          EERING    TIME      COST
AK-690303165 PROJECT: 3351291055
REPLACE/MONITOR UST IN ALASKA
ACCT: OE
ALL DISTRICT 17 LIGHT STATIONS
JUNEAU                           AK

AK-690303165 PROJECT: 1773217059
REMOVE FUEL TANKS
ACCT: OE
ALL DISTRICT 17 LIGHT STATIONS
JUNEAU                           AK

AK-690330742 PROJECT: 3346000100
CLEAN-UP PCB CONTAMINATED AREA
ACCT: OE
USCG SUPPORT CENTER
KODIAK                           AK

AK-690330742 PROJECT: 3346000058
FUEL FARM SITE INVESTIGATION
ACCT: AC 4 I
USCG SUPPORT CENTER
KODIAK                           AK

AK-690330742 PROJECT: 3346000065
STORM/SEWER SEPERATION
ACCT: OE
USCG SUPPORT CENTER
KODIAK                           AK

AL-690308338 PROJECT: 3251281001
REPLACE/MONITOR UST IN ALABAMA
ACCT: OE
SMD-MIAMI
MIAMI, FL                        AL
    8,120.0  ESDF
      140.0  ESRO
      100.0  ESDP
    8,000.0  PSDF
      100.0  ESRO
       27.0  ESDF
90/09 MEDIUM   WATER    ADEQUATE   ADEQUATE   ADEQUATE
                         DESIGN    TIMING    ESTIMATE
91/03 MEDIUM   WATER     ADEQUATE   ADEQUATE   ADEQUATE
                         DESIGN    TIMING    ESTIMATE
90/09  HIGH    TOXIC    ADEQUATE  ADEQUATE   ADEQUATE
             SUBSTANCE    DESIGN    TIMING    ESTIMATE
                           90/09  HIGH    WATER
                           90/09   LOW     WATER
                           90/09 MEDIUM   WATER
                          NOT       NOT
                         AVAIL     AVAIL
 NOT
AVAIL
                                                  ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
                                                  ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE

-------
                                  FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR  1991

                          DEPT  OF  TRANSPORTATION                  UNITED STATES COAST GUARD
                 PROJECT  IDENTIFICATION
                    REQ    EST   PROJECT
  BUDGET     COMPL   COMPL  COHPL ASSESS- MEDIA
(THOUSANDS)   STATUS  DATE   DATE  MENT    TYPE
                                                                                                                     DOT-11
                           ADEQUACY OF PROJECT
                         ENGIN-
                         EERING    TIME      COST
AL-690319897  PROJECT:  7665100002
REPLACE UNDERGROUND  STORAGE TANKS
ACCT: OE
AVTRACEN MOBILE
MOBILE                           AL

DC-690345959  PROJECT:  773 91
CERCLA/SARA COMPLIANCE
ACCT: OE
COAST GUARD HEADQUARTERS
WASHINGTON                       DC

FL-690308338  PROJECT:  3251281002
REPLACE/MONITOR UST  IN FLORIDA
ACCT: OE
BASE MIAMI BEACH
MIAMI BEACH                      FL

HI-690360541  PROJECT: 3351292001
REPLACE/MONITOR UST  IN HAWAII
ACCT: OE
BASE HONOLULU
HONOLULU                         HI

MI-690308590 PROJECT: 3080953001
REMOVE CONTAMINATED SOIL
ACCT: OE
USCG STATION MUNISING
MUNISING                         MI

MI-690308593 PROJECT: 3251282004
REPLACE/MONITOR UST IN MICHIGAN
ACCT: OE
SMD-CLEVELAND
CLEVELAND                        MI
       20.0   PSDF    93/12  90/09 MEDIUM   SOLID    ADEQUATE  ADEQUATE   ADEQUATE
                                         WASTE     DESIGN    TIMING    ESTIMATE
    2,000.0   PSDF    93/04  90/09  HIGH    CERCLA   ADEQUATE  ADEQUATE   ADE-QUATE
                                                   DESIGN    TIMING    ESTIMATE
       23.0   ESDF
        5.0   ESDF
       10.0   ESDF
      275.0   ESDF
                          90/09 MEDIUM   WATER
                          90/09 MEDIUM   WATER
                        ADEQUATE   ADEQUATE   ADEQUATE
                         DESIGN     TIMING    ESTIMATE
                        ADEQUATE   ADEQUATE   ADEQUATE
                         DESIGN    TIMING    ESTIMATE
90/09  HIGH    CERCLA   ADEQUATE   ADEQUATE    ADEQUATE
                         DESIGN    TIMING    ESTIMATE
90/09 MEDIUM   WATER    ADEQUATE  ADEQUATE    ADEQUATE
                         DESIGN    TIMING    ESTIMATE

-------
                                 FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                         DEPT OF TRANSPORTATION                  UNITED STATES COAST GUARD
                PROJECT IDENTIFICATION
                     REQ    EST   PROJECT
  BUDGET     COMPL   COMPL  COMPL ASSESS-  MEDIA
(THOUSANDS)   STATUS  DATE   DATE   MENT    TYPE
                                                                                                                      DOT-12
                            ADEQUACY OF PROJECT
                          ENGIN-
                          EERING    TIME      COST
MI-690308708 PROJECT: 4320160001
TRAVERSE CITY AIR STATION CLEAN UP TOXIC W
ACCT: OE
TRAVERSE CITY AIR STATION
TRAVERSE CITY                    MI

MO-69030S593 PROJECT: 3251282006
REPLACE/MONITOR UST IN MISSOURI
ACCT: OE
SMD-CLEVELAND
CLEVELAND                        MO

NC-690308232 PROJECT: B773.80
FUEL FARM GROUNDWATER INVESTIGATION/REMEDIAL
ACCT: AC 4 I
SUPPORT CENTER ELIZABETH CITY
ELIZABETH CITY                   NC

NC-690308593 PROJECT: 3251282007
REPLACE/MONITOR UST IN NORTH CAROLINA
ACCT: OE
SMD-CLEVELAND
CLEVELAND                        NC

OH-690308593 PROJECT: 3251282011
REPLACE/MONITOR UST IN OHIO
ACCT: OE
SMD-CLEVELAND
CLEVELAND                        OH

OR-690308758 PROJECT: 3351290002
REPLACE/MONITOR UST IN OREGON
ACCT: OE
SMD-ALAMEDA
ALAMEDA                          OR
      625.0  ESDF
       20.0  ESDF
      500.0  INOV
       46.0  ESDF
       60.0  ESDF
        9.0  ESDF
                           90/09  HIGH     CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
90/09 MEDIUM   WATER
90/09  HIGH    SOLID
               WASTE
ADEQUATE  ADEQUATE   ADEQUATE
 DESIGN    TIMING    ESTIMATE
ADEQUATE  ADEQUATE   ADEQUATE
 DESIGN    TIMING    ESTIMATE
                           90/09  MEDIUM   WATER    ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
                           90/09  MEDIUM   WATER
                           90/09  MEDIUM   WATER
                                                  ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
                                                  ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE

-------
                                 FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR  1991

                         DEPT OF TRANSPORTATION                  UNITED STATES COAST GUARD
                PROJECT IDENTIFICATION
                     REQ    EST   PROJECT
  BUDGET     COMPL    COMPL  COMPL ASSESS- MEDIA
(THOUSANDS)   STATUS   DATE   DATE  MENT    TYPE
                                                                                                                     DOT-13
    ADEQUACY OF PROJECT
  ENGIN-
  EERING    TIME      COST
PR-690308338 PROJECT: 3251261005
REPLACE/MONITOR UST IN PEURTO RICO
ACCT: OE
SMD-MIAMI
MIAMI                            PR

SC-69030S338 PROJECT: 3251281005
REPLACE/MONITOR UST IN SOUTH CAROLINA
ACCT: OE
SMD-MIAMI
MIAMI                            SC

WA-690308758 PROJECT: 3351290003
REPLACE/MONITOR UST IN WASHINGTON
ACCT: OE
SMD-ALAMEDA
ALAMEDA                          WA

WI-690308593 PROJECT: 3251282015
REPLACE/MONITOR UST IN WISCONSIN
ACCT: OE
SMD-CLEVELAND
CLEVELAND                        WI
    1,299.0   ESDF
       28.0   ESDF
        5.0   ESDF
       35.0   ESDF
                           90/09 MEDIUM   WATER
                           90/09 MEDIUM   WATER
                           90/09 MEDIUM   WATER
                          90/09 MEDIUM   WATER
ADEQUATE  ADEQUATE   ADEQUATE
 DESIGN    TIMING    ESTIMATE
ADEQUATE  ADEQUATE   ADEQUATE
 DESIGN    TIMING    ESTIMATE
ADEQUATE  ADEQUATE   ADEQUATE
 DESIGN    TIMING    ESTIMATE
                                                  ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
      TOTAL, UNITED STATES COAST GUARD
              21,447.0
                                                                                            22

-------
                                 FEDERAL AGENCY  POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                         DEPT OF TRANSPORTATION                  FEDERAL AVIATION ADMIN
                PROJECT IDENTIFICATION
                     RES    EST   PROJECT
  BUDGET     COMPL   COMPL  COMPL ASSESS- MEDIA
(THOUSANDS)  STATUS  DATE   DATE  MENT    TYPE
                                                                     DOT-14
  ADEQUACY OF PROJECT
ENGIN-
EERING    TIME      COST
AK-690502021 PROJECT: 00050
INVESTIGATION OF FORMER FAA FACILITY
ACCT: OTHER
BIG LAKE VORTAC FACILITY
BIG LAKE                         AK

AK-690502024 PROJECT: 00520
INVESTIGATION OF FORMER FAA FACILITY
ACCT: OTHER
ABANDONED KATALLA FAA FACILITY
KATALLA                          AK

AK-690502033 PROJECT: 00300
INVESTIGATION OF FAA FACILITY
ACCT: OTHER
PUTILLA AIR NAVIGATION SITE
ANCHORAGE                        AK

AK-690502036 PROJECT: 00320
INVESTIGATION OF FORMER FAA FACILITIES
ACCT: OTHER
SKWENTNA FAA FACILITIES
SKWENTNA                         AK

AK-690502043 PROJECT: 00340
INVESTIGATION OF FORMER FAA FACILITIES
ACCT: OTHER
TALKEETNA FAA FACILITY
TALKEETNA                        AK

AK-690502046 PROJECT: 00330
INVESTIGATION OF FORMER FAA FACILITY
ACCT: OTHER
SUMMIT AIR NAVIGATION SITE
CANTWELL                         AK
      100.0  ESDF   91/06  91/06 MEDIUM   CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
                                                    DESIGN    TIMING    ESTIMATE
      200.0  ESDF   91/06  91/07 MEDIUM   CERCLA    ADEQUATE  ADEQUATE   ADEQUATE
                                                    DESIGN    TIMING    ESTIMATE
      200.0  ESDF   91/06  91/03 MEDIUM   CERCLA    ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
      200.0   ESDF    90/06   90/09 MEDIUM    SOLID    ADEQUATE  ADEQUATE   ADEQUATE
                                          HASTE     DESIGN    TIMING    ESTIMATE
      100.0   ESDF    91/06   90/12  MEDIUM   CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
       25.0   ESDF    90/06   90/09 MEDIUM   CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE

-------
                                  FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR  1991

                          DEPT  OF  TRANSPORTATION                  FEDERAL AVIATION ADMIN
                 PROJECT  IDENTIFICATION
                    REQ    EST   PROJECT
  BUDGET     COMPL   COMPL  COMPL ASSESS- MEDIA
(THOUSANDS)   STATUS  DATE   DATE  MENT    TYPE
                                                                                                                     DOT-15
  ADEQUACY OF PROJECT
ENGIN-
EERING    TIME      COST
AK-690502055  PROJECT:  00460
INVESTIGATION OF  FAA FACILITIES
ACCT: OTHER
MC 6RATH  FAA  FACILITIES
MC GRATH                         AK

AK-690502063  PROJECT:  00200
INVESTIGATION OF  FORMER FAA  FACILITIES
ACCT: OTHER
HOMER FAA FACILITY
HOMER                            AK

AK-690502074  PROJECT:  00500
INVESTIGATION OF  FAA FACILITY
ACCT: OTHER
LAKE HOOD FAA FACILITY
ANCHORAGE                        AK

AK-690502136  PROJECT:  00040
INVESTIGATION OF  FAA FACILITIES AT FORT 6REELY
ACCT: OTHER
BIG DELTA FAA  FACILITIES
DELTA JUNCTION                   AK

AK-690502141  PROJECT: 00160
INVESTIGATION OF  FORMER FAA FACILITIES
ACCT: OTHER
6ULKANA AIR NAVIGATION SITE
GULKANA                          AK

AK-690502146  PROJECT: 00490
INVESTIGATION OF FORMER FAA FACILITY
ACCT: OTHER
SLANA FAA FACILITY
SLANA                            AK
      500.0   ESDF    91/06  90/12 MEDIUM   CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
      150.0   ESDF    91/06  91/07 MEDIUM   CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
       50.0   ESDF    90/06  90/09 MEDIUM   CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
      150.0   ESDF    91/06  90/12 MEDIUM   CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
      150.0   ESDF   91/06  91/07 MEDIUM   CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
      150.0  ESDF   91/06  90/12 MEDIUM   CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE

-------
                                 FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                         DEPT OF TRANSPORTATION                  FEDERAL AVIATION ADMIN
                PROJECT IDENTIFICATION
                     REQ    EST   PROJECT
  BUDGET     COMPL   COMPL  COMPL ASSESS- MEDIA
(THOUSANDS)  STATUS  DATE   DATE  MENT     TYPE
                                                                     DOT-16
  ADEQUACY OF PROJECT
ENGIN-
EERING    TIME      COST
AK-690502153 PROJECT: 00360
INVESTIGATION OF FAA FACILITIES
ACCT: OTHER
UNALAKLEET FAA FACILITY
UNAKLEET                         AK

AK-690502156 PROJECT: 00230
INVESTIGATION OF FAA FACILITIES
ACCT: OTHER
KOTZEBUE FAA FACILITIES
KOTZEBUE                         AK

AK-690502165 PROJECT: 00260
INVESTIGATION OF FORMER FAA FACILITIES
ACCT: OTHER
MOSES POINT FAA FACILITIES
ELIM                             AK

AK-690502167 PROJECT: 00350
INVESTIGATION OF FORMER FAA FACILITIES
ACCT: OTHER
TANANA FAA FACILITIES
TANANA                           AK

AK-690502169 PROJECT: 00030
INVESTIG FUEL STORAGE & GROUND WATER CONTAMINAT
ACCT: OTHER
BETTLES FAA FACILITIES
SETTLES                          AK

AK-690502178 PROJECT: 00140
INVESTIGATION OF FAA FACILITIES
ACCT: OTHER
FORT YUKON FAA FACILITIES
FORT YUKON                       AK
      200.0  ESDF   91/06  90/12 MEDIUM   CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
      150.0  ESDF   92/06   91/07 MEDIUM    CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
      650.0  ESDF   90/06   90/09  MEDIUM   CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
      200.0  ESDF    90/06   90/09 MEDIUM   CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
      300.0  ESDF    91/06   91/03  HIGH   DRINKING  ADEQUATE  ADEQUATE   ADEQUATE
                                         WATER     DESIGN    TIMING    ESTIMATE
      150.0  ESDF    91/06   91/07 MEDIUM   CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE

-------
                                  FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                          DEPT  OF  TRANSPORTATION                  FEDERAL AVIATION ADMIN
                 PROJECT  IDENTIFICATION
                     REq    EST   PROJECT
  BUDGET     COMPL    COMPL  COMPL ASSESS- MEDIA
(THOUSANDS)   STATUS   DATE   DATE  MENT    TYPE
                                                                                                                     DOT-17
  ADEQUACY OF PROJECT
ENGIN-
EERING    TIME      COST
AK-690502189  PROJECT:  00280
INVESTIGATION OF  FORMER  FAA  FACILITIES
ACCT: OTHER
NORTH NENANA  FAA  FACILITY
NENANA                           AK

AK-690502199  PROJECT:  00150
INVESTIGATION OF  FORMER  FAA  FACILITIES
ACCT: OTHER
GALENA FAA FACILITIES
GALENA                           AK

AK-690502230  PROJECT:  AAL-FA1-01
REMOVE AND DISPOSE PCB ARTICLES
ACCT: OTHER
FAA NORTH ALASKA  SECTOR
FAIRBANKS                        AK

AK-690502232  PROJECT:  00450
INVESTIGATION OF  FAA FACILITIES
ACCT: OTHER
KING SALMON FAA FACILITIES
KING SALMON                      AK

AK-690502Z43  PROJECT:  00*10
INVESTIGATION OF  FAA FACILITIES
ACCT: OTHER
BETHEL FAA FACILITIES
BETHEL                           AK

AK-690502258 PROJECT:  00370
INVESTIGATION OF  FORMER FAA FACILITIES
ACCT: OTHER
WOODY ISLAND AIR NAVIGATION SITE
KODIAK                           AK
      150.0   ESDF    91/06   90/12 MEDIUM   CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
      100.0   ESDF    91/06   91/07 MEDIUM   CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
      500.0   ESDP
                          90/09  HIGH    TOXIC    ADEQUATE  ADEQUATE   ADEQUATE
                                       SUBSTANCE   DESIGN    TIMING    ESTIMATE
      200.0   ESDF    91/06  90/12 MEDIUM   CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
      250.0   ESDF   91/06  90/09 MEDIUM   CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
      300.0  ESDF   90/06  90/09 MEDIUM   CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE

-------
                                 FEDERAL AGEHCY  POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                         DEPT OF TRANSPORTATION                  FEDERAL AVIATION ADMIN
                PROJECT IDENTIFICATION
                     REQ    EST   PROJECT
  BUDGET     COMPL   COMPL  COMPL ASSESS- MEDIA
(THOUSANDS)  STATUS  DATE   DATE  MEKT    TYPE
                                                                      DOT-18
  ADEQUACY OF PROJECT
ENGIN-
EERING    TIME      COST
AK-690502267 PROJECT: 00010
INVESTIGATION OF FORMER FAA FACILITIES
ACCT: OTHER
ANIAK FAA FACILITIES
ANIAK                            AK

AK-690502272 PROJECT: 00430
INVESTIGATION OF FAA FACILITIES
ACCT: OTHER
COLD BAY FAA FACILITY
COLD BAY                         AK

AK-690502287 PROJECT: 00090
INVESTIGATION OF FORMER FAA FACILITIES
ACCT: OTHER
DILLINGHAM FAA FACILITIES
DILLINGHAM                       AK

AK-690502290 PROJECT: 00210
INVESTIGATION OF FORMER FAA FACILITIES
ACCT: OTHER
ILIAMNA FAA FACILITIES
ILIAMNA                          AK

AK-690502294 PROJECT: 00530
INVESTIGATION OF FORMER FAA FACILITIES
ACCT: OTHER
SHUYAK ISLAND FAA FACILITY
KODIAK                           AK

AK-690502330 PROJECT: 00250
INVESTIGATION OF FORMER FAA FACILITIES
ACCT: OTHER
MIDDLETON ISLAND FAA FACILITIES
MIDDLETON ISLAND                 AK
      150.0  ESDF   91/06  90/12 MEDIUM   SOLID     ADEQUATE   ADEQUATE    ADEQUATE
                                          WASTE      DESIGN    TIMING     ESTIMATE
      200.0  ESDF   91/06  91/03 MEDIUM   CERCU   ADEQUATE  ADEQUATE   ADEQUATE
                                                    DESIGN    TIMING    ESTIMATE
      200.0  ESDF    91/06   90/12  MEDIUM   CERCLA    ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
      150.0   ESDF    91/06   90/12  MEDIUM    CERCLA    ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
      150.0   ESDF    91/06   90/12  MEDIUM    CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
      500.0   ESDF    90/06   90/09 MEDIUM   CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE

-------
                                  FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                          DEPT OF TRANSPORTATION                 FEDERAL AVIATION ADMIN
                 PROJECT IDENTIFICATION
                    REQ    EST   PROJECT
  BUDGET     COMPL   COMPL  COMPL ASSESS- MEDIA
(THOUSANDS)   STATUS  DATE   DATE  MENT    TYPE
                                                                                                                      DOT-19
  ADEQUACY OF PROJECT
ENGIN-
EERING    TIME      COST
 AK-690502337 PROJECT:  00020
 INVEST OF FORMER FAA FACILITIES ON ANNETTE  ISLA
 ACCT:  OTHER
 ANNETTE ISLAND FAA FACILITIES
 METUKATLA                       AK

 AK-690502344 PROJECT:  00440
 INVESTIGATION OF FAA FACILITIES
 ACCT:  OTHER
 CORDOVA FAA FACILITIES
 CORDOVA                          AK

 AK-690502351  PROJECT:  00190
 INVESTIGATION OF FORMER  FAA FACILITIES
 ACCT:  OTHER
 HINCHINBROOK  ISLAND  (STRAWBERRY POINT)
 CORDOVA                          AK

 AK-690502354  PROJECT:  00070
 INVESTIGATION OF  FORMER  FAA FACILITIES
 ACCT:  OTHER
 CAPE YAKATAGA FAA  FACILITY
 CAPE YAKATAGA                    AK

 AK-690502355  PROJECT:  00220
 INVESTIGATION OF FAA FACILITIES
 ACCT:  OTHER
 JOHNSTONS POINT FAA FACILITY
 CORDOVA                           AK

 AK-690502357  PROJECT:  00080
 INVESTIGATION OF FAA FACILITIES
 ACCT: OTHER
 COGHLAN ISLAND FAA FACILITY
AUKE BAY                         AK
      200.0   ESDP    91/06  90/12  HIGH    TOXIC    ADEQUATE  ADEQUATE   ADEQUATE
                                       SUBSTANCE   DESIGN    TIMING    ESTIMATE
      200.0   ESDF   91/06  90/12 MEDIUM   CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
      100.0   ESDF   90/06  90/09 MEDIUM   SOLID    ADEQUATE  ADEQUATE   ADEQUATE
                                         WASTE     DESIGN    TIMING    ESTIMATE
      300.0  ESDF   91/06  91/03  HIGH    SOLID    ADEQUATE  ADEQUATE   ADEQUATE
                                         WASTE     DESIGN    TIMING    ESTIMATE
      150.0  ESDF   90/06  90/09  HIGH   DRINKING  ADEQUATE  ADEQUATE   ADEQUATE
                                         WATER     DESIGN    TIMING    ESTIMATE
     100.0  ESDF   91/06  91/03 MEDIUM   CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE

-------
                                 FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                         DEPT OF TRANSPORTATION                  FEDERAL AVIATION ADMIN
                PROJECT IDENTIFICATION
                     REQ    EST   PROJECT
  BUDGET     COMPL   COMPL  COMPL ASSESS-  MEDIA
(THOUSANDS)  STATUS  DATE   DATE  MENT    TYPE
                                                                                                                      DOT-20
  ADEQUACY OF PROJECT
ENGIN-
EERING    TIME      COST
AK-690502358 PROJECT: 00100
INVESTIGATION OF FORMER FAA FACILITIES
ACCT: OTHER
DUNCAN CANAL FAA FACILITY
PETERSBURG                       AK

AK-690502361 PROJECT: 00240
INVESTIGATION OF FORMER FAA FACILITIES
ACCT: OTHER
LEVEL ISLAND FAA FACILITY
PETERSBURG                       AK

AK-690502362 PROJECT: 00480
INVESTIGATION OF FAA FACILITIES
ACCT: OTHER
SISTERS ISLAND FAA FACILITY
JUNEAU                           AK

AK-690502369 PROJECT: 00170
INVESTIGATE FORMER FAA FACILITIES, WASTE DISPOS
ACCT: OTHER
GUSTAVUS FAA FACILITY
GUSTAVUS                         AK

AK-690502374 PROJECT: 00180
INVESTIGATION OF FORMER FAA FACILITIES
ACCT: OTHER
HAINES AIR NAVIGATION SITE
HAINES                           AK

AK-690502380 PROJECT: 00060
INVESTIGATION OF FORMER FAA FACILITIES
ACCT: OTHER
BIORKA ISLAND FAA FACILITY
SITKA                            AK
      100.0  ESDF   91/06  90/12  MEDIUM    SOLID    ADEQUATE  ADEQUATE   ADEQUATE
                                          HASTE     DESIGN    TIMING    ESTIMATE
      250.0  ESDF   91/06  90/12  MEDIUM    CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
      350.0  ESDF   91/06   90/12  MEDIUM   CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
      200.0  ESDF   90/06   90/09   HIGH   DRINKING  ADEQUATE  ADEQUATE   ADEQUATE
                                         WATER     DESIGN    TIMING    ESTIMATE
      100.0  ESDF   91/06   91/07  MEDIUM   CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
       20.0  ESDF   90/06   90/09  MEDIUM   CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE

-------
                                  FEDERAL AGENCY  POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                          DEPT OF TRANSPORTATION                  FEDERAL AVIATION ADMIN
                 PROJECT IDENTIFICATION
                     REQ    EST    PROJECT
  BUDGET     COMPL   COMPL  COMPL  ASSESS- MEDIA
(THOUSANDS)   STATUS  DATE    DATE   MENT    TYPE
                                                                                                                      DOT-21
  ADEQUACY OF PROJECT
ENGIN-
EERING    TIME      COST
 AK-690502385 PROJECT:  00380
 INVESTIGATION OF FAA FACILITIES
 ACCT:  OTHER
 YAKATAT FAA FACILITIES
 YAKATAT                         AK

 AK-690502429 PROJECT:  00470
 INVESTIGATION OF FAA FACILITIES
 ACCT:  OTHER
 SHEEP  MOUNTAIN FAA  FACILITY
 SHEEP  MOUNTAIN AIRPORT AREA      AK

 AK-690502466 PROJECT:  00420
 INVESTIGATION OF FAA FACILITIES
 ACCT:  OTHER
 CHANDALAR AIR NAVIGATION AID
 CHANDALAR LAKE                  AK

 AK-690502508 PROJECT:  00110
 INVESTIGATION OF FORMER FAA FACILITIES
 ACCT:  OTHER
 DUTCH  HARBOR FAA FACILITY
 DUTCH  HARBOR                    AK

 AK-690502548 PROJECT: AAL-ANC-01
 REMOVE t DISPOSE  PCB ARTICLES
 ACCT:  OTHER
 US DOT/FAA  (NORTH ALASKA SECTOR)
 FAIRBANKS                        AK

AK-690502683  PROJECT: 00270
 INVESTIGATION OF FORMER FAA FACILITIES
ACCT: OTHER
NENANA FAA  FIELD SITE
NENANA                           AK
      200.0   ESDF    91/06   91/05 MEDIUM   CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
      150.0   ESDF    91/06   90/12 MEDIUM   CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
      200.0   ESDF    91/06   91/03 MEDIUM   CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
      100.0   ESDF    91/06  91/03 MEDIUM   CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
      500.0   ESDP
                          90/09  HIGH    TOXIC    ADEQUATE  ADEQUATE   ADEQUATE
                                       SUBSTANCE   DESIGN    TIMING    ESTIMATE
      150.0  ESDF   91/06  90/12 MEDIUM   CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE

-------
                                 FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                         DEPT OF TRANSPORTATION                  FEDERAL AVIATION ADMIN
                PROJECT IDENTIFICATION
                     REQ    EST   PROJECT
  BUDGET     COMPL   COMPL  COMPL ASSESS- MEDIA
(THOUSANDS)  STATUS  DATE   DATE  MENT    TYPE
                                                                     DOT-22
                            ADEQUACY OF PROJECT
                          ENGIN-
                          EERING    TIME      COST
AK-690532106 PROJECT: USTAKF01
LUST EPA REGION
ACCT: OTHER
ALASKAN REGION
ANCHORAGE                        AK

AK-690533576 PROJECT: 00510
INVESTIGATION OF FORMER FAA FACILITIES
ACCT: OTHER
ABANDONED HOONAH FAA FACILITY
HOONAH                           AK

AL-690522940 PROJECT: USTALF01
LUST EPA REGION 04
ACCT: OTHER
FAA SOUTHERN REGION
EAST POINT                       AL

AR-690548201 PROJECT: UST-AR-F04
LUST EPA REGION 06
ACCT: OTHER
FAA SOUTHWEST REGION
FORT WORTH                       AR

AS-690502240 PROJECT: UST-AS-F06
LUST EPA REGION 09
ACCT: OTHER
FAA WESTERN-PACIFIC REGION
LOS ANGLES                       AS

AZ-690502240 PROJECT: UST-AZ-03
LUST EPA REGION 09
ACCT: OTHER
FAA WESTERN-PACIFIC REGION
LOS ANGLES                       AZ
    1,151.2  ESDF
90/09  HIGH    SOLID    ADEQUATE  ADEQUATE    ADEQUATE
               WASTE     DESIGN    TIMING    ESTIMATE
      150.0  ESDF   91/06   90/12  MEDIUM    CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
      258.*  ESDF
      188.0  ESDF
       29.4  OTHR
      246.7  OTHR
                           90/09  MEDIUM    SOLID    ADEQUATE  ADEQUATE   ADEQUATE
                                          WASTE     DESIGN    TIMING    ESTIMATE
90/09 MEDIUM   SOLID    ADEQUATE   ADEQUATE   ADEQUATE
               WASTE     DESIGN    TIMING    ESTIMATE
                           90/09 MEDIUM   SOLID
                                         WASTE
                           90/09 MEDIUM   SOLID
                                         WASTE
                        ADEQUATE  ADEQUATE   ADEQUATE
                         DESIGN   TIMING    ESTIMATE
                        ADEQUATE  ADEQUATE   ADEQUATE
                         DESIGN    TIMING    ESTIMATE

-------
                                  FEDERAL AGENCY  POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                          DEPT OF TRANSPORTATION                  FEDERAL AVIATION ADMIN
                 PROJECT IDENTIFICATION
                     REQ     EST   PROJECT
  BUDGET     COMPL    COMPL   COMPL ASSESS- MEDIA
(THOUSANDS)   STATUS   DATE    DATE  MENT    TYPE
                                                                                                                      DOT-Z3
                            ADEQUACY  OF  PROJECT
                          ENGIN-
                          EERING    TIME     COST
 AZ-690548201 PROJECT: UST-AZ-F05
 LUST EPA REGION 09
 ACCT: OTHER
 FAA SOUTHWEST REGION
 FORT WORTH                       AZ

 CA-690502240 PROJECT: UST-CA-F01
 LUST EPA REGION 09
 ACCT: OTHER
 FAA WESTERN-PACIFIC REGION
 LOS ANGLES                       CA

 CA-690506970 PROJECT: AWP-RO-005
 HAZ.  MAT.  MGT
 ACCT: OTHER
 REGIONAL OFFICE
 LAWNDALE                         CA

 CA-690506970 PROJECT: AWP-RO-010
 ASBESTOS ABATEMENT
 ACCT:  OTHER
 REGIONAL OFFICE
 LAWNDALE                         CA
                                                        11.7  ESDF
    1,527.2   OTHR
      459.0   ESDF
      670.0  OTHR
                           90/09 MEDIUM   SOLID
                                         WASTE
90/09 MEDIUM   SOLID
               WASTE
                          90/09  HIGH     AIR
                          90/09  HIGH     AIR
                        ADEQUATE   ADEQUATE   ADEQUATE
                         DESIGN    TIMING    ESTIMATE
ADEQUATE  ADEQUATE   ADEQUATE
 DESIGN    TIMING    ESTIMATE
                                                  ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
                                                  ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
CA-690506970 PROJECT: AWP-RO-006
UST REPLACEMENT/ALTERNATIVE TECHNOLOGY
ACCT: OTHER
REGIONAL OFFICE
LAWNDALE                         CA

CO-690508000 PROJECT: ANM-ZDV-02
UNDERGROUND STORAGE TANK REPLACEMENT
ACCT: OTHER
AIRWAY FACILITIES SECTOR-ARTCC
LONGMONT                         CO
    1,224.0   ESDF   91/09  90/09  HIGH
      60.0   ESDP   91/09  90/09  HIGH
               SOLID     ADEQUATE   ADEQUATE    ADEQUATE
               WASTE      DESIGN     TIMING     ESTIMATE
                                         SOLID    ADEQUATE  ADEQUATE   ADEQUATE
                                         WASTE     DESIGN    TIMING    ESTIMATE

-------
                                 FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                         DEPT OF TRANSPORTATION                  FEDERAL AVIATION ADMIN
                PROJECT IDENTIFICATION
                     REQ    EST   PROJECT
  BUDGET     COMPL   COMPL  COMPL ASSESS-  MEDIA
(THOUSANDS)   STATUS  DATE   DATE   MENT     TYPE
                                                                     DOT-24
                            ADEQUACY OF PROJECT
                          ENGIN-
                          EERING    TIME      COST
CO-690508000 PROJECT: ANM-ZDV-01
REPLACE OR DECONTAMINATE PCS ARTICLES
ACCT: OTHER
AIRWAY FACILITIES SECTOR-ARTCC
LONGMONT                         CO

CO-69050S169 PROJECT: ANM-AUR-03
ASBESTOS ABATEMENT
ACCT: OTHER
AIRWAY FACILITIES SECTOR-HUD
AURORA                           CO

CO-690508169 PROJECT: ANM-DEN-01
REPLACE OR DECONTAMINATE PCS ARTICLES
ACCT: OTHER
AIRWAY FACILITIES SECTOR-HUD
AURORA                           CO

CO-690575320 PROJECT: USTCOF04
LUST EPA REGION 08
ACCT: OTHER
NORTHWEST MOUNTAIN REGION
SEATTLE                          CO

CT-690554660 PROJECT: UST-CT-F04
LUST EPA REGION 01
ACCT: OTHER
NEW ENGLAND REGION
BURLINGTON                       CT

DC-690524020 PROJECT: USTDCF08
LUST EPA REGION 03
ACCT: OTHER
FAA EASTERN REGION
JAMAICA                          DC
       10.0  ESDP   90/01   90/09  MEDIUM    TOXIC    ADEQUATE  ADEQUATE   ADEQUATE
                                        SUBSTANCE   DESIGN    TIMING    ESTIMATE
    1,297.0  ESDP
91/12 MEDIUM   TOXIC    ADEQUATE   ADEQUATE    ADEQUATE
             SUBSTANCE   DESIGN    TIMING    ESTIMATE
       10.0   ESDF    90/01   90/09 MEDIUM   TOXIC    ADEQUATE  ADEQUATE   ADEQUATE
                                       SUBSTANCE   DESIGN    TIMING    ESTIMATE
      581.5  ESDF
       82.2   ESDF
       11.7  ESDF
                           90/09 MEDIUM   SOLID    ADEQUATE  ADEQUATE   ADEQUATE
                                         WASTE     DESIGN    TIMING    ESTIMATE
                           90/09 MEDIUM   SOLID
                                         WASTE
                           90/09 MEDIUM   SOLID
                                         WASTE
                        ADEQUATE   ADEQUATE   ADEQUATE
                         DESIGN    TIMING    ESTIMATE
                        ADEQUATE   ADEQUATE   ADEQUATE
                         DESIGN    TIMING    ESTIMATE

-------
                                  FEDERAL AGENCY  POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                          DEPT OF TRANSPORTATION                  FEDERAL AVIATION ADMIN
                 PROJECT IDENTIFICATION
                     REQ    EST    PROJECT
  BUDGET     COMPL   COMPL   COMPL  ASSESS- MEDIA
(THOUSANDS)   STATUS  DATE    DATE   MENT    TYPE
                                                                     DOT-25
                            ADEQUACY OF  PROJECT
                          ENGIN-
                          EERING    TIME      COST
 DE-690524020 PROJECT:  USTDEF01
 LUST EPA REGION 03
 ACCT:  OTHER
 EASTERN REGION
 JAMAICA                          DE

 FL-690522940 PROJECT:  USTFLF03
 LUST EPA REGION 04
 ACCT:  OTHER
 FAA SOUTHERN REGION
 EAST POINT                       FL

 GA-690522940 PROJECT:  USTGAF02
 LUST EPA REGION 04
 ACCT:  OTHER
 FAA SOUTHERN REGION
 EAST POINT                       GA

 GU-690502240 PROJECT:  UST-GU-F05
 LUST EPA REGION 09
 ACCT:  OTHER
 FAA WESTERN-PACIFIC REGION
 LOS ANGLES                       GU

 HI-690502240  PROJECT:  UST-HI-F04
 LUST EPA  REGION 09
 ACCT:  OTHER
 FAA  WESTERN-PACIFIC REGION
 LOS  ANGLES                        HI

 IA-690500127  PROJECT:  UST-IA-F01
 LUST EPA REGION  07
ACCT: OTHER
FAA CENTRAL REGION
KANSAS CITY                       IA
                                                       23.5  ESDF
      763.6   ESDF
      446.4  ESDF
       52.9  OTHR
      199.7   ESDF
      261.9   ESDF
                           90/09  MEDIUM    SOLID
                                          WASTE
                           90/09  MEDIUM   SOLID
                                         WASTE
                           90/09  MEDIUM   SOLID
                                         WASTE
                           90/09 MEDIUM   SOLID
                                         WASTE
90/09 MEDIUM   SOLID
               WASTE
90/09 MEDIUM   SOLID
               HASTE
                        ADEQUATE  ADEQUATE    ADEQUATE
                         DESIGN    TIMING    ESTIMATE
                        ADEQUATE  ADEQUATE    ADEQUATE
                         DESIGN    TIMING    ESTIMATE
                        ADEQUATE  ADEQUATE   ADEQUATE
                         DESIGN    TIMING    ESTIMATE
                        ADEQUATE  ADEQUATE   ADEQUATE
                         DESIGN    TIMING    ESTIMATE
ADEQUATE  ADEQUATE   ADEQUATE
 DESIGN    TIMING    ESTIMATE
                                                  ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE

-------
                                 FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                         DEPT OF TRANSPORTATION                  FEDERAL AVIATION ADMIN
                PROJECT IDENTIFICATION
                     REQ    EST   PROJECT
  BUDGET     COMPL   COMPL  COMPL ASSESS- MEDIA
(THOUSANDS)  STATUS  DATE   DATE  MENT    TYPE
                                                                     DOT-26
                            ADEQUACY OF PROJECT
                          ENGIN-
                          EERING    TIME      COST
ID-690575320 PROJECT: USTIDF03
LUST EPA REGION 10
ACCT: OTHER
NORTHWEST MOUNTAIN REGION
SEATTLE                          ID

IL-690517027 PROJECT: AGL-ZAU-01
DISPOSAL OF PCB CONTAMINATED ITEMS
ACCT: OTHER
AURORA ARTCC
AURORA                           IL

IL-690518890 PROJECT: USTILF02
LUST EPA REGION
ACCT: OTHER
FAA GREAT LAKES REGION
DES PLAINES                      IL

IN-690518055 PROJECT: AGL-ZID-01
DISPOSAL OF PCB CONTAMINATED ITEMS
ACCT: OTHER
INDIANAPOLIS CENTER AIRWAY FACILITIES SECTOR
INDIANAPOLIS                     IN

IN-690518890 PROJECT: USTINF01
LUST EPA REGION 05
ACCT: OTHER
FAA GREAT LAKES REGION
DES PLAINES                      IN

KS-690500127 PROJECT: UST-KS-F02
LUST EPA REGION 07
ACCT: OTHER
LUST EPA REGION 07
KANSAS CITY                      KS
      358.3  ESDF
        0.1   ESRO
      522.8  ESDF
        0.1   ESRO
      334.8  ESDF
      370.0   ESDF
                           90/09 MEDIUM   SOLID     ADEQUATE  ADEQUATE   ADEQUATE
                                          WASTE      DESIGN    TIMING    ESTIMATE
                           90/09 MEDIUM   TOXIC    ADEQUATE  ADEQUATE   ADEQUATE
                                        SUBSTANCE   DESIGN    TIMING    ESTIMATE
90/09 MEDIUM   SOLID    ADEQUATE  ADEQUATE   ADEQUATE
               WASTE     DESIGN    TIMING    ESTIMATE
                           90/09  LOW     TOXIC    ADEQUATE  ADEQUATE   ADEQUATE
                                       SUBSTANCE   DESIGN    TIMING    ESTIMATE
                           90/09 MEDIUM   SOLID
                                         WASTE
                           90/09 MEDIUM   SOLID
                                         WASTE
                        ADEQUATE   ADEQUATE   ADEQUATE
                         DESIGN    TIMING    ESTIMATE
                        ADEQUATE  ADEQUATE   ADEQUATE
                         DESIGN   TIMING    ESTIMATE

-------
                                  FEDERAL  AGENCY  POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                          DEPT OF TRANSPORTATION                  FEDERAL AVIATION ADMIN
                 PROJECT IDENTIFICATION
                     REQ     EST    PROJECT
  BUDGET     COMPL    COMPL   COMPL  ASSESS- MEDIA
(THOUSANDS)   STATUS   DATE    DATE   MENT    TYPE
                                                                                                                      DOT-27
                            ADEQUACY OF  PROJECT
                          ENGIN-
                          EERING     TIME      COST
 KS-690538300 PROJECT:  ACE-ZKC-02
 REPLACE PCB COMPONENTS IN PCS
 ACCT: OTHER
 AIRWAY FACILITY SECTOR - ARTCC
 0LATHE                           KS

 KY-690522940 PROJECT:  USTKYF05
 LUST EPA REGION 04
 ACCT: OTHER
 FAA SOUTHERN REGION
 EAST POINT                       KY

 LA-690548201 PROJECT:  UST-LA-F03
 LUST EPA REGION 06
 ACCT:  OTHER
 FAA SOUTHWEST REGION
 FORTWORTH                        LA

 MA-690554660 PROJECT:  UST-MA-F02
 LUST EPA REGION 01
 ACCT:  OTHER
 NEW ENGLAND REGION
 BURLINGTON                        MA

 MD-690524020  PROJECT:  UST-MD-F05
 LUST  EPA  REGION 03
 ACCT:  OTHER
 FAA  EASTERN REGION
 JAMAICA                           MD

 ME-690554660  PROJECT:  UST-ME-F01
 LUST EPA  REGION  01
ACCT: OTHER
NEW ENGLAND REGION
BURLINGTON                       ME
                                                       50.6  OTHR
      258.4  ESDF
      340.7   ESDF
      158.6   ESDF
      234.9   ESDF
      158.6   ESDF
                           90/09   LOW     TOXIC    ADEQUATE  ADEQUATE     NOT
                                       SUBSTANCE   DESIGN    TIMING     AVAIL
                           90/09 MEDIUM   SOLID    ADEQUATE  ADEQUATE   ADEQUATE
                                         WASTE     DESIGN    TIMING    ESTIMATE
                          90/09 MEDIUM   SOLID
                                         WASTE
                          90/09 MEDIUM   SOLID
                                         WASTE
90/09 MEDIUM   SOLID
               WASTE
                          90/09 MEDIUM   SOLID
                                         WASTE
                        ADEQUATE   ADEQUATE    ADEQUATE
                         DESIGN    TIMING    ESTIMATE
                        ADEQUATE  ADEQUATE    ADEQUATE
                         DESIGN    TIMING    ESTIMATE
                                                  ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
                        ADEQUATE  ADEQUATE    ADEQUATE
                         DESIGN    TIMING    ESTIMATE

-------
                                 FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                         DEPT OF TRANSPORTATION                  FEDERAL AVIATION ADMIN
                PROJECT IDENTIFICATION
                     REQ    EST   PROJECT
  BUDGET     COMPL   COMPL  COMPL ASSESS-  MEDIA
(THOUSANDS)   STATUS  DATE   DATE   MENT     TYPE
                                                                                                                      DOT-28
                            ADEQUACY OF PROJECT
                          ENGIN-
                          EERING    TIME      COST
MI-690518890 PROJECT: USTMIF08
LUST EPA REGION 05
ACCT: OTHER
FAA GREAT LAKES REGION
DES PLAINES                      MI

MN-690518890 PROJECT: USTMNF04
LUST EPA REGION 05
ACCT: OTHER
FAA GREAT LAKES REGION
DES PLAINES                      MN

MN-690527010 PROJECT: AGL-ZMP-01
DISPOSAL OF PCB CONTAMINATED ITEMS
ACCT: OTHER
MINNEAPOLIS CENTER AIRWAY FACILITIES SECTOR
FARMINGTON                       MN

MO-690500127 PROJECT: UST-MO-F03
LUST EPA REGION 07
ACCT: OTHER
FAA CENTRAL REGION
KANSAS CITY                      MO

MS-690522940 PROJECT: USTMSF06
LUST EPA REGION 04
ACCT: OTHER
FAA SOUTHERN REGION
EAST POINT                       MS

MT-690530094 PROJECT: ANM-BIL-01
REPLACE OR DECONTAMINATE PCB ARTICLES
ACCT: OTHER
AIRWAY FACILITIES SECTOR
BILLINGS                         MT
      405.3  ESDF
      246.7  ESDF
        0.1  ESRO
      411.2  ESDF
      234.9  ESDF
                           90/09 MEDIUM    SOLID
                                          HASTE
90/09 MEDIUM   SOLID
               WASTE
                        ADEQUATE  ADEQUATE    ADEQUATE
                         DESIGN    TIMING    ESTIMATE
                                                  ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
90/09  LOW     TOXIC    ADEQUATE  ADEQUATE    ADEQUATE
             SUBSTANCE   DESIGN    TIMING    ESTIMATE
                           90/09  MEDIUM   SOLID    ADEQUATE  ADEQUATE   ADEQUATE
                                         WASTE     DESIGN    TIMING    ESTIMATE
                           90/09  MEDIUM   SOLID    ADEQUATE  ADEQUATE   ADEQUATE
                                         WASTE     DESIGN    TIMING    ESTIMATE
       10.0  ESDP   90/01   90/09  MEDIUM   TOXIC    ADEQUATE  ADEQUATE   ADEQUATE
                                       SUBSTANCE   DESIGN    TIMING    ESTIMATE

-------
                                  FEDERAL AGENCY  POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                          DEPT OF TRANSPORTATION                  FEDERAL AVIATION ADMIN
                 PROJECT IDENTIFICATION
                     REQ     EST    PROJECT
  BUDGET     COMPL   COMPL   COMPL  ASSESS- MEDIA
(THOUSANDS)   STATUS   DATE    DATE   MENT    TYPE
                                                                     DOT-29
                            ADEQUACY OF PROJECT
                          ENGIN-
                          EERING    TIME      COST
 MT-690530094 PROJECT: ANM-BIL-03
 ASBESTOS ABATEMENT
 ACCT: OTHER
 AIRWAY FACILITIES SECTOR
 BILLINGS                         MT

 MT-690575320 PROJECT: USTMTF02
 LUST EPA REGION 08
 ACCT: OTHER
 NORTHWEST MOUNTAIN REGION
 SEATTLE                           MT

 NC-690522940 PROJECT: USTNCF04
 LUST EPA REGION 04
 ACCT: OTHER
 FAA  SOUTHERN REGION
 EAST POINT                       NC

 ND-690516890 PROJECT: USTNDF05
 LUST EPA REGION 08
 ACCT:  OTHER
 FAA  GREAT LAKES REGION
 DES  PLAINES                      ND

 NE-690500127 PROJECT:  UST-NE-F04
 LUST EPA  REGION 07
 ACCT:  OTHER
 FAA  CENTRAL  REGION
 KANSAS CITY                     NE

NH-690554660  PROJECT:  UST-NH-F05
 LUST  EPA REGION  01
ACCT: OTHER
NEW  ENGLAND REGION
BURLINGTON                       NH
    1,172.0   ESDP
      211.5   ESDF
      405.3   ESDF
      188.0  ESDF
      193.8   ESDF
      99.9  ESDF
91/12 MEDIUM   TOXIC    ADEQUATE  ADEQUATE    ADEQUATE
             SUBSTANCE   DESIGN    TIMING    ESTIMATE
                           90/09 MEDIUM   SOLID    ADEQUATE  ADEQUATE   ADEQUATE
                                         WASTE     DESIGN    TIMING    ESTIMATE
                          90/09 MEDIUM   SOLID
                                         WASTE
                          90/09 MEDIUM   SOLID
                                         WASTE
                        ADEQUATE  ADEQUATE    ADEQUATE
                         DESIGN    TIMING    ESTIMATE
                        ADEQUATE  ADEQUATE    ADEQUATE
                         DESIGN    TIMING    ESTIMATE
90/09 MEDIUM   SOLID    ADEQUATE  ADEQUATE    ADEQUATE
               WASTE     DESIGN    TIMING    ESTIMATE
                          90/09 MEDIUM   SOLID    ADEQUATE  ADEQUATE   ADEQUATE
                                         WASTE     DESIGN    TIMING    ESTIMATE

-------
                                 FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                         DEPT OF TRANSPORTATION                  FEDERAL AVIATION ADMIN
                PROJECT IDENTIFICATION
                     REQ    EST   PROJECT
  BUDGET     COMPL   COMPL  COMPL ASSESS- MEDIA
(THOUSANDS)  STATUS  DATE   DATE  MENT    TYPE
                                                                      DOT-30
                            ADEQUACY OF PROJECT
                          ENGIN-
                          EERING    TIME      COST
NJ-690510024 PROJECT: NAF-2
INVESTIGATIONS OF HAZARDOUS WASTE SITES
ACCT: OTHER
FAA TECHNICAL CENTER
ATLANTIC CITY                    NJ

NJ-690510024 PROJECT: NAF-9
CLEANUP OF HAZARDOUS WASTE SITES
ACCT: OTHER
FAA TECHNICAL CENTER
ATLANTIC CITY                    NJ

NJ-690510024 PROJECT: UST-NJ-F01
LUST EPA REGION 02
ACCT: OTHER
FAA TECHNICAL CENTER
ATLANTIC CITY                    NJ

NJ-690524020 PROJECT: U5T-NJ-F04
LUST EPA REGION 02
ACCT: OTHER
FAA EASTERN REGION
JAMAICA                          NJ

NM-690548201 PROJECT: UST-NM-F02
LUST EPA REGION 06
ACCT: OTHER
FAA SOUTHWEST REGION
FORT WORTH                       NM

NV-690502240 PROJECT: UST-NV-F02
LUST EPA REGION 09
ACCT: OTHER
FAA WESTERN-PACIFIC REGION
LOS ANGLES                       NV
    1,500.0  PSDF   90/04  90/09  HIGH
    5>000.0  PSDF   93/01   90/09  HIGH
                                          CERCLA   ADEQUATE   ADEQUATE   ADEQUATE
                                                    DESIGN    TIMING    ESTIMATE
               CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
                         DESIGN    TIMING    ESTIMATE
      716.6  ESDF
      240.8  ESDF
      469.9  ESDF
      381.8  OTHR
90/09 MEDIUM   SOLID    ADEQUATE  ADEQUATE   ADEQUATE
               WASTE     DESIGN    TIMING    ESTIMATE
90/09 MEDIUM   SOLID    ADEQUATE  ADEQUATE    ADEQUATE
               WASTE     DESIGN    TIMING    ESTIMATE
                           90/09 MEDIUM    SOLID
                                          WASTE
90/09 MEDIUM   SOLID
               WASTE
                        ADEQUATE  ADEQUATE   ADEQUATE
                         DESIGN    TIMING   ESTIMATE
                                                  ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE

-------
                                  FEDERAL  AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                          DEPT OF  TRANSPORTATION                  FEDERAL AVIATION ADMIN
                 PROJECT IDENTIFICATION
                                    REQ    EST   PROJECT
                 BUDGET     COHPL   COMPL  COMPL ASSESS- MEDIA
               (THOUSANDS)  STATUS  DATE   DATE  MENT    TYPE
                                                                                                                      DOT-31
                            ADEQUACY OF PROJECT
                          ENGIN-
                          EERING    TIME      COST
 NY-690524020 PROJECT:  UST-NY-F02
 LUST EPA REGION 02
 ACCT: OTHER
 FAA EASTERN REGION
 JAMAICA                         NY

 NY-690536210 PROJECT:  AEA-AF-031
 REMOVE ASBESTOS
 ACCT: OTHER
 NY ARTIC (ZNY)
 RONKONKOMA                      NY

 OH-690518890 PROJECT:  USTOHF03
 LUST EPA REGION 05
 ACCT: OTHER
 FAA GREAT LAKES REGION
 DES PLAINES                     OH

 OH-690539320 PROJECT:  A6L-ZOB-01
 DISPOSAL OF  PCB CONTAMINATED ITEMS
 ACCT:  OTHER
 OBERLIN  ARTCC
 OBERLIN                          OH
OK-690500000 PROJECT: UST-F
LUST EPA REGION
ACCT: OTHER
FAA AERONAUTICAL CENTER
OKLAHOMA CITY
OK-690540000 PROJECT: AAC-506
ASBESTOS ABATEMENT
ACCT: OTHER
DOT FAA AERONAUTICAL CENTER
OKLAHOMA CITY
OK
OK
                     775.3  ESDF
                     250.0  ESRE
                     469.9  ESDF
                       0.1  ESRO
                     152.7  ESDF
                                                      350.0  ESRO
90/09 MEDIUM   SOLID    ADEQUATE   ADEQUATE    ADEQUATE
               WASTE     DESIGN    TIMING    ESTIMATE
90/09 MEDIUM    AIR     ADEQUATE   ADEQUATE    ADEQUATE
                         DESIGN    TIMING     ESTIMATE
                                          90/09 MEDIUM   SOLID     ADEQUATE   ADEQUATE    ADEQUATE
                                                         WASTE      DESIGN     TIMING     ESTIMATE
                                          90/09 MEDIUM   TOXIC    ADEQUATE  ADEQUATE   ADEQUATE
                                                       SUBSTANCE    DESIGN    TIMING    ESTIMATE
                                          90/09 MEDIUM   SOLID
                                                         WASTE
                                          90/09  HIGH     AIR
                        ADEQUATE   ADEQUATE    ADEQUATE
                         DESIGN    TIMING     ESTIMATE
                                                                  ADEQUATE   ADEQUATE    ADEQUATE
                                                                   DESIGN     TIMING     ESTIMATE

-------
                                 FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                         DEPT OF TRANSPORTATION                  FEDERAL AVIATION ADMIN
                PROJECT IDENTIFICATION
                                    REQ    EST   PROJECT
                 BUDGET     COMPL   COMPL  COMPL ASSESS- MEDIA
               (THOUSANDS)  STATUS  DATE   DATE  MENT    TYPE
                                                                                                                     DOT-32
                            ADEQUACY OF PROJECT
                          ENGIN-
                          EERING    TIME      COST
OK-690540000 PROJECT: AAC-50H
AIR EMISSION INVENTORY
ACCT: OTHER
DOT FAA AERONAUTICAL CENTER
OKLAHOMA CITY                    OK

OK-690540000 PROJECT: AAC-50B
RADIOISOTOPES BURIAL PLOT
ACCT: OTHER
DOT FAA AERONAUTICAL CENTER
OKLAHOMA CITY                    OK

OK-690540000 PROJECT: UST-  -F
LUST EPA REGION
ACCT: OTHER
DOT FAA AERONAUTICAL CENTER
OKLAHOMA CITY                    OK

OK-690540000 PROJECT: AAC-50A
COMPREHENSIVE ENVIRONMENTAL ASSESSMENT
ACCT: OTHER
DOT FAA AERONAUTICAL CENTER
OKLAHOMA CITY                    OK
OK-690540000 PROJECT: AAC-50E
HAZARDOUS WASTE DISPOSAL SITE
ACCT: OTHER
DOT FAA AERONAUTICAL CENTER
OKLAHOMA CITY
OK-690540000 PROJECT: AAC-50C
PRETREAT INDUSTRIAL WASTE
ACCT: OTHER
DOT FAA AERONAUTICAL CENTER
OKLAHOMA CITY
OK
OK
                      50.0  OTHR
                     500.0  INOV
                     152.7  ESDF
                      50.0  OTHR
                                                      750.0  OTHR
                                          90/09  LOW
                AIR     ADEQUATE  ADEQUATE    ADEQUATE
                         DESIGN    TIMING    ESTIMATE
90/09 MEDIUM   CERCLA   ADEQUATE  ADEQUATE    ADEQUATE
                         DESIGN    TIMING     ESTIMATE
90/09 MEDIUM   SOLID    ADEQUATE   ADEQUATE   ADEQUATE
               WASTE     DESIGN    TIMING    ESTIMATE
                                          90/09  HIGH    SOLID     ADEQUATE  ADEQUATE   ADEQUATE
                                                         WASTE      DESIGN    TIMING    ESTIMATE
                                          90/09  HIGH     SOLID     ADEQUATE  ADEQUATE   ADEQUATE
                                                         WASTE      DESIGN    TIMING    ESTIMATE
                     150.0  CMPA   89/10  90/09  HIGH     WATER    ADEQUATE  ADEQUATE   ADEQUATE
                                                                   DESIGN    TIMING    ESTIMATE

-------
                                  FEDERAL  AGENCY  POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                          DEPT OF  TRANSPORTATION                  FEDERAL AVIATION ADMIN
                 PROJECT IDENTIFICATION
                     REQ    EST   PROJECT
  BUDGET     COMPL   COMPL  COMPL  ASSESS- MEDIA
(THOUSANDS)  STATUS  DATE    DATE   MENT    TYPE
                                                                     DOT-33
                            ADEQUACY OF PROJECT
                          ENGIN-
                          EERING    TIME      COST
 OK-690548201  PROJECT:  USTOKF06
 LUST EPA REGION 06
 ACCT:  OTHER
 FAA SOUTHWEST REGION
 FORT WORTH                      OK

 OR-690541159  PROJECT:  ANM-PDX-01
 REPLACE  OR DECONTAMINATE  PCB  ARTICLES
 ACCT:  OTHER
 AIRWAY FACILITIES  SECTOR
 PORTLAND                        OR

 OR-690541159  PROJECT:  ANM-POR-03
 ASBESTOS ABATEMENT
 ACCT:  OTHER
 AIRWAY FACILITIES  SECTOR
 PORTLAND                        OR

 OR-690575320  PROJECT:  USTORF05
 LUST EPA REGION  10
 ACCT:  OTHER
 NORTHWEST MOUNTAIN REGION
 SEATTLE                          OR

 PA-690518890  PROJECT:  USTF09
 LUST EPA  REGION  03
 ACCT:  OTHER
 FAA GREAT  LAKES REGION
 DES PLAINES                      PA

 PA-690524020  PROJECT:  UST-PA-F07
 LUST EPA REGION 02
ACCT: OTHER
 FAA EASTERN REGION
JAMAICA                          PA
                                                      317.2  ESDF
                           90/09  MEDIUM   SOLID    ADEQUATE  ADEQUATE   ADEQUATE
                                         WASTE     DESIGN    TIMING    ESTIMATE
       10.0  ESDP   90/01   90/09  MEDIUM   TOXIC    ADEQUATE  ADEQUATE   ADEQUATE
                                       SUBSTANCE   DESIGN    TIMING    ESTIMATE
    1,102.0  ESDP
      287.8  ESDF
        5.9   ESDF
      563.9   ESDF
91/12  HIGH    TOXIC      NOT       NOT
             SUBSTANCE   AVAIL     AVAIL
90/09 MEDIUM   SOLID
               WASTE
90/09 MEDIUM   SOLID
               HASTE
                       NOT
                      AVAIL
                                                  ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
ADEQUATE  ADEQUATE   ADEQUATE
 DESIGN    TIMING    ESTIMATE
90/09 MEDIUM   SOLID    ADEQUATE  ADEQUATE   ADEQUATE
               HASTE     DESIGN    TIMING    ESTIMATE

-------
                                 FEDERAL AGENCY POLLUTION ABATEMENT PUN FOR FISCAL YEAR 1991

                         DEPT OF TRANSPORTATION                  FEDERAL AVIATION ADMIN
                PROJECT IDENTIFICATION
                     REQ    EST   PROJECT
  BUDGET     COMPL   COMPL  COMPL ASSESS- MEDIA
(THOUSANDS)  STATUS  DATE   DATE  MENT    TYPE
                                                                      DOT-34
                            ADEQUACY OF PROJECT
                          ENGIN-
                          EERING    TIME      COST
PR-690522940 PROJECT: USTPRF10
LUST EPA REGION 02
ACCT: OTHER
FAA SOUTHERN REGION
EAST POINT                       PR

RI-690554660 PROJECT: UST-RI-F03
LUST EPA REGION 01
ACCT: OTHER
NEW ENGLAND REGION
BURLINGTON                       RI

SC-690522940 PROJECT: USTSCF08
LUST EPA REGION 04
ACCT: OTHER
FAA SOUTHERN REGION
EAST POINT                       SC

SD-69051S890 PROJECT: USTSDF06
LUST EPA REGION 08
ACCT: OTHER
FAA GREAT LAKES REGION
DES PLAINES                      SD

TN-690522940 PROJECT: USTTNF07
LUST EPA REGION 04
ACCT: OTHER
FAA SOUTHERN REGION
EAST POINT                       TN

TX-690548201 PROJECT: USTTXF01
LUST EPA REGION 06
ACCT: OTHER
USDOT-FAA REGIONAL OFFICE
FORT WORTH                       TX
       76.4  ESDF
       35.2  ESDF
      293.7  ESDF
      117.5  ESDF
      440.5  ESDF
    1,503.7  ESDF
                           90/09 MEDIUM   SOLID
                                          WASTE
                           90/09 MEDIUM   SOLID
                                          WASTE
                        ADEQUATE  ADEQUATE   ADEQUATE
                         DESIGN    TIMING    ESTIMATE
                        ADEQUATE  ADEQUATE    ADEQUATE
                         DESIGN    TIMING    ESTIMATE
90/09 MEDIUM   SOLID    ADEQUATE  ADEQUATE    ADEQUATE
               WASTE     DESIGN    TIMING    ESTIMATE
90/09 MEDIUM   SOLID    ADEQUATE  ADEQUATE   ADEQUATE
               WASTE     DESIGN    TIMING    ESTIMATE
90/09 MEDIUM   SOLID
               WASTE
90/09 MEDIUM   SOLID
               WASTE
ADEQUATE  ADEQUATE   ADEQUATE
 DESIGN    TIMING    ESTIMATE
ADEQUATE  ADEQUATE   ADEQUATE
 DESIGN    TIMING    ESTIMATE

-------
                                  FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                          DEPT OF  TRANSPORTATION                  FEDERAL AVIATION ADMIN
                 PROJECT IDENTIFICATION
                     REQ     EST    PROJECT
  BUDGET     COMPL    COMPL   COMPL  ASSESS- MEDIA
(THOUSANDS)   STATUS   DATE    DATE   MENT    TYPE
                                                                                                                      DOT-35
                            ADEQUACY OF  PROJECT
                          ENGIN-
                          EERING    TIME      COST
 UT-690549015 PROJECT:  ANM-ZLC-02
 UNDERGROUND STORAGE TANK REPLACEMENT
 ACCT:  OTHER
 AIRWAY FACILITIES SECTOR ARTCC
 SALT LAKE CITY                  UT

 UT-69C549015 PROJECT:  ANM-ZLC-01
 REPLACE OR DECONTAMINATE PCB ARTICLES
 ACCT:  OTHER
 AIRWAY FACILITIES SECTOR ARTCC
 SALT LAKE CITY                  UT

 UT-690549069 PROJECT:  ANM-SLC-01
 REPLACE OR DECONTAMINATE PCB ARTICLES
 ACCT:  OTHER
 AIRWAY FACILITIES SECTOR (HUB)
 SALT LAKE CITY                  UT

 UT-690549069 PROJECT:  ANM-SLC-03
 ASBESTOS  ABATEMENT
 ACCT:  OTHER
 AIRWAY FACILITIES  SECTOR  (HUB)
 SALT LAKE  CITY                  UT

 VA-690522940  PROJECT:  USTVAF11
 LUST EPA  REGION 03
 ACCT:  OTHER
 FAA SOUTHERN  REGION
 EAST POINT                       VA

 VA-690524020  PROJECT:  UST-VA-F06
 LUST EPA REGION 03
ACCT: OTHER
 FAA EASTERN REGION
JAMAICA                          VA
       60.0   ESDP   91/09   90/09  HIGH    SOLID    ADEQUATE  ADEQUATE   ADEQUATE
                                         WASTE     DESIGN    TIMING    ESTIMATE
       10.0   ESDP    90/01   90/09 MEDIUM   TOXIC    ADEQUATE  ADEQUATE   ADEQUATE
                                       SUBSTANCE   DESIGN    TIMING    ESTIMATE
       10.0   ESDP    90/01   90/09 MEDIUM   TOXIC    ADEQUATE  ADEQUATE   ADEQUATE
                                       SUBSTANCE   DESIGN    TIMING    ESTIMATE
      303.0   ESDP
       23.5   ESDF
      522.6   ESDF
                           91/12 MEDIUM   TOXIC    ADEQUATE  ADEQUATE   ADEQUATE
                                       SUBSTANCE   DESIGN    TIMING    ESTIMATE
90/09 MEDIUM   SOLID
               WASTE
90/09 MEDIUM   SOLID
               WASTE
                                                  ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
                                                  ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE

-------
                                 FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                         DEPT OF TRANSPORTATION                  FEDERAL AVIATION ADMIN
                PROJECT IDENTIFICATION
                     REG}    EST   PROJECT
  BUDGET     COMPL   COMPL  COMPL ASSESS- MEDIA
(THOUSANDS)  STATUS  DATE   DATE  MENT    TYPE
                                                                     DOT-36
                            ADEQUACY OF PROJECT
                          ENGIN-
                          EERING    TIME      COST
VA-690551166 PROJECT: AEA-AF-033
REMOVE ASBESTOS
ACCT: OTHER
WASHINGTON ARTCC (ZDC)
LEESBURG                         VA

VI-690522940 PROJECT: USTVIF09
LUST EPA REGION 02
ACCT: OTHER
FAA SOUTHERN REGION
EAST POINT                       VI

VT-690554660 PROJECT: UST-VT-F06
LUST EPA REGION
ACCT: OTHER
NEW ENGLAND REGION
BURLINGTON                       VT

VT-690575320 PROJECT: USTVTF07
LUST EPA REGION 08
ACCT: OTHER
NORTHWEST MOUNTAIN REGION
SEATTLE                          VT

WA-690553001 PROJECT: ANM-ZSE-01
REPLACE OR DECONTAMINATE PCB ARTICLES
ACCT: OTHER
AIRWAY FACILITIES SECTOR_ARTCC
AUBURN                           WA

WA-690553099 PROJECT: ANM-SEA-03
ASBESTOS ABATEMENT
ACCT: OTHER
AIRWAY FACILITIES SECTOR
SEATTLE                          WA
      250.0  ESRE
       35.2  ESDF
             ESDF
      387.7  ESDF
90/09  HIGH     AIR     ADEQUATE  ADEQUATE   ADEQUATE
                         DESIGN    TIMING    ESTIMATE
90/09 MEDIUM   SOLID    ADEQUATE  ADEQUATE   ADEQUATE
               WASTE     DESIGN    TIMING    ESTIMATE
90/09 MEDIUM   SOLID    ADEQUATE  ADEQUATE    ADEQUATE
               WASTE     DESIGN    TIMING    ESTIMATE
90/09 MEDIUM   SOLID    ADEQUATE   ADEQUATE   ADEQUATE
               WASTE     DESIGN    TIMING    ESTIMATE
       10.0  PSDF   90/01   90/09  MEDIUM   TOXIC    ADEQUATE  ADEQUATE   ADEQUATE
                                        SUBSTANCE   DESIGN    TIMING    ESTIMATE
    1,268.0  ESDP
91/12  HIGH    TOXIC    ADEQUATE   ADEQUATE   ADEQUATE
             SUBSTANCE   DESIGN    TIMING    ESTIMATE

-------
                                  FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                          DEPT  OF  TRANSPORTATION                  FEDERAL AVIATION ADMIN
                 PROJECT  IDENTIFICATION
                     REQ    EST    PROJECT
  BUDGET     COMPL   COMPL  COMPL  ASSESS- MEDIA
(THOUSANDS)   STATUS  DATE    DATE   MENT    TYPE
                                                                     DOT-37
                            ADEQUACY  OF  PROJECT
                          ENGIN-
                          EERING   TIME      COST
 WA-690553099  PROJECT:  ANM-SEA-01
 REPLACE  OR  DECONTAMINATE  PCB ARTICLES
 ACCT:  OTHER
 AIRWAY FACILITIES  SECTOR
 SEATTLE                          HA

 WA-690575320  PROJECT:  USTWAF01
 LUST EPA REGION  10
 ACCT:  OTHER
 NORTHWEST MOUNTAIN REGION
 SEATTLE                          WA

 WI-690518890  PROJECT:  USTWIF07
 LUST EPA REGION  05
 ACCT:  OTHER
 FAA GREAT LAKES  REGION
 DES PLAINES                      WI

 WV-690524020  PROJECT:  UST-WV-F03
 LUST EPA REGION  03
 ACCT:  OTHER
 FAA EASTERN REGION
 JAMAICA                          WV

WY-690575320 PROJECT: USTWYF06
 LUST EPA REGION
ACCT: OTHER
NORTHWEST MOUNTAIN REGION
SEATTLE                          WY
       10.0  PSDF    90/01   90/09  MEDIUM   TOXIC    ADEQUATE  ADEQUATE   ADEQUATE
                                       SUBSTANCE   DESIGN    TIMING    ESTIMATE
      428.8  ESDF
      223.2   ESDF
      158.6   ESDF
      340.7   ESDF
90/09 MEDIUM   SOLID    ADEQUATE  ADEQUATE    ADEQUATE
               WASTE     DESIGN    TIMING     ESTIMATE
90/09 MEDIUM   SOLID    ADEQUATE  ADEQUATE    ADEQUATE
               WASTE     DESIGN    TIMING    ESTIMATE
90/09 MEDIUM   SOLID
               WASTE
90/09 MEDIUM   SOLID
               WASTE
ADEQUATE  ADEQUATE   ADEQUATE
 DESIGN    TIMING    ESTIMATE
ADEQUATE  ADEQUATE   ADEQUATE
 DESIGN    TIMING    ESTIMATE
      TOTAL, FEDERAL AVIATION ADMIN
              46,743.8
                                                                                           143

-------
                                 FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                         DEPT OF TRANSPORTATION                  FEDERAL HIGHWAY ADMINISTRATION
                PROJECT IDENTIFICATION
                     REQ    EST   PROJECT
  BUDGET     COMPL   COMPL  COMPL ASSESS- MEDIA
(THOUSANDS)  STATUS  DATE   DATE  MENT    TYPE
                                                                     DOT-38
             ADEQUACY OF PROJECT
           ENGIN-
           EERING    TIME      COST
VA-690705950 PROJECT: RCRAWO-01
PROTECTING UNDERGROUND TANK
ACCT: OTHER
TURNER FAIRBANK HMY RESEARCH
MCLEAN                           VA

WA-69070594S PROJECT: RCRA17-01
PROTECTING UNDERGROUND TANK
ACCT: OTHER
FEDERAL HWY ADMIN. WDFD
VANCOUVER                        MA
       10.0  PSDF   91/09  90/09  HIGH
        1.0  PSDF   87/09  90/09  LOW
SOLID    ADEQUATE  ADEQUATE   ADEQUATE
WASTE     DESIGN    TIMING    ESTIMATE
                                          SOLID    ADEQUATE  ADEQUATE   ADEQUATE
                                          WASTE     DESIGN    TIMING    ESTIMATE
      TOTAL, FEDERAL HIGHWAY ADMINISTRATION
                  11.0

-------
                                 FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR  FISCAL  YEAR  1991

                         DEPT OF TRANSPORTATION                  FEDERAL RAILROAD  ADMIN
                 PROJECT IDENTIFICATION
                    REQ    EST   PROJECT
  BUDGET     COMPL   COMPL  COMPL ASSESS- MEDIA
(THOUSANDS)   STATUS  DATE   DATE  MENT    TYPE
                                                                                                                     DOT-39
  ADEQUACY OF PROJECT
ENGIN-
EERING    TIME      COST
CO-690936229  PROJECT: AARTTC0004
CLEANUP OF SOLID WASTE MGMT UNITS
ACCT: OTHER
TRANSPORTATION TEST CENTER
PUEBLO                           CO

CO-690936229  PROJECT: AARTTC0003
UNDERGROUND FUEL-OIL STORAGE TANKS
ACCT: OTHER
TRANSPORTATION TEST CENTER
PUEBLO                           CO

CO-690936229  PROJECT: AARTTC0005
DISMANTLE CTA RECTIFIER SUBSTATION
ACCT: OTHER
TRANSPORTATION TEST CENTER
PUEBLO                           CO
                                                      257.0  INOV
       91.0   ESDF
       75.0   ESRO
                          90/10  HIGH    SOLID    ADEQUATE  ADEQUATE   ADEQUATE
                                         WASTE     DESIGN    TIMING    ESTIMATE
                          90/09 MEDIUM   SOLID      NOT       NOT
                                         WASTE     AVAIL     AVAIL
                          90/09 MEDIUM   TOXIC      NOT
                                       SUBSTANCE   AVAIL
          NOT
         AVAIL
                     NOT
                    AVAIL
 NOT
AVAIL
      TOTAL, FEDERAL RAILROAD ADMIN
                                                                 423.0

-------
                                 FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                         DEPT OF TRANSPORTATION                  MARITIME ADMINISTRATION
                PROJECT IDENTIFICATION
                     REQ    EST   PROJECT
  BUDGET     COMPL   COMPL  COMPL ASSESS- MEDIA
(THOUSANDS)  STATUS  DATE   DATE  MENT    TYPE
                                                                     DOT-40
                            ADEQUACY OF PROJECT
                          ENGIN-
                          EERING    TIME      COST
CA-691005165 PROJECT: MA004
UNDERGROUND STORAGE TANKS
ACCT: OTHER
SUISUN BAY RESERVE FLEET
BENICA                           CA

TX-691035876 PROJECT: MA003
UNDERGROUND STORAGE TANKS
ACCT: OTHER
BEAUMONT RESERVE FLEET
BEAUMONT                         TX

VA-69103587S PROJECT: MA002
UNDERGROUND STORAGE TANKS
ACCT: OTHER
JAMES RIVER RESERVE FLEET
FORT EUSTIC                      VA

*     TOTAL, MARITIME ADMINISTRATION
        4.0  ESDF
        4.0  ESDF
        6.0  ESDF
                           90/09 MEDIUM   SOLID
                                          WASTE
                           90/09 MEDIUM   SOLID
                                          WASTE
90/09  HIGH
                                         SOLID
                                         WASTE
                        ADEQUATE  ADEQUATE   ADEQUATE
                         DESIGN    TIMING    ESTIMATE
                          NOT
                         AVAIL
            NOT
           AVAIL
 NOT
AVAIL
ADEQUATE  ADEQUATE   ADEQUATE
 DESIGN    TIMING    ESTIMATE
                                                                  14.0
      TOTAL, DEPT OF TRANSPORTATION
              68,644.5
                                                                                           174

-------
NASA

-------
      NATIONAL
AERONAUTICS AND SPACE
    ADMINISTRATION

-------
                                                       NASA-1
NATIONAL AERONATICS AND SPACE ADMINISTRATION

The National Aeronautics and Space Administration (NASA) owns 71
installations and occupies 132,000 acres. It also owns 2,565
buildings which contain a total of 35.6 million square feet of
area.

AGENCY POLLUTION ABATEMENT PLAN FOR FY 1991

NASA proposed 49 projects, totalling $5.3 million in their
environmental plan for FY 1991. EPA is currently working with
NASA to assist them in conducting training for their agency staff
in the A-106 environmental needs identification and reporting
process.

EPA evaluated each project contributed by NASA to their
environmental plan and categorized them according to their
potential environmental impact if the projects were not funded in
FY 1991.  EPA rated 25 projects as having a "High" environmental
impact  (budgeted at $17.4 million). "Medium" ratings were
assigned to 21 projects (totalling $6.2 million). "Low" impact
ratings were assigned to 3 projects (totalling $1.6 million).

The distribution of projects proposed among compliance classes
for NASA indicates that there are 8 Class I projects, those in
the plan for current compliance reasons, or 16 percent of the
total number of projects in the FY 1991 plan. The 22 Class II
projects, those in the plan to permit the agency to meet near-
term future compliance deadlines, make up 45 percent of the
total; and the 19 Class III projects, those in the plan for other
environmental reasons, make up 39 percent of the total.

The projects proposed by NASA in their FY 1991 plan are
distributed across the various environmental media programs in
the following pattern: 7 projects in the air compliance area,
costing $4 million; 11 water and drinking water projects, costing
$7 million; 20 projects in the RCRA area, costing $9 million;
another 6 projects in the CERCLA area, costing $5 million.  Also
there are 5 projects in the noise, pesticides, toxics, and multi-
media areas, costing $758 thousand.

-------
                                                                                NASA-2
                         TOTAL NUMBER OF POLLUTION ABATEMENT

                           PROJECTS PROPOSED FOR FY 1987 - 91

                             NATL AERONAUTICS & SPACE ADMIN
  UJ

  O
  cc
  0.

  u.
  O

  cc
  Ul
  m
  s

  z
                   FY87
FY88
                                             FY89
FY90
FY91
NASA FIG 1
                                         RSCALYEARS

-------
                                                                                      NASA-3
                             TOTAL DOLLARS REQUESTED FOR POLLUTION

                               ABATEMENT PROJECTS FOR FY 1987 - 91

                                 NATL AERONAUTICS & SPACE ADMIN
            40000
            30000-
    o
    o
    o
    0)
    oc
    O
    Q
20000-
            10000-
                      FY87
                         FY88
                                                   FY89
                                                     FY90
FY91
                                               RSCAL YEARS
NASA FIG 2

-------
                                                                                     NASA-4
                      TOTAL NUMBER AND DOLLARS PROPOSED FOR
                      POLLUTION ABATEMENT NEEDS FOR FY 1991
                        NATL AREONAUTICS & SPACE ADMIN
                                                                     25265.4
      10
100
                                          1000
10000
100000
NASA FIG 3
             PROJECTS

             DOLLARS ($000)

-------
                                                                                       NASA-5
                        TOTAL NUMBER AND DOLLARS PROPOSED FOR
                           CLASS I, II, III PROJECTS FOR FY 1991
                             NATL AERONAUTICS & SPACE ADMIN
     CLASS I
    CLASS
    CLASS III
                                        100
           1000
10000
100000
NASA FIG 4
PROJECTS

DOLLARS ($000)

-------
                                                                                   NASA-6
   NASA - TABLE 1: EPA EVALUATION OF THE ENVIRONMENTAL IMPACT OF PROPOSED
                   POLLUTION ABATEMENT PROJECTS FOR FISCAL YEAR 1991
                   INCLUDING NUMBER AND COST
                         NATIONAL AERONAUTICS & SPACE ADMINISTRATION
COMPLIANCE *
STATUS

CMPA
INOV
ESDP
ESDF
PSDF
ESRO
ESRE
ESDL
OTHR
GRAND TOTAL
HIGH
PROJECTS
COST
($1,000)
1
400.0
1
2,200.0
6
2,895.0
11
7,479.0
2
430.0
0
0.0
1
360.0
0
0.0
3
3,700.0
25
17,464.0
MEDIUM
PROJECTS
COST
($1,000)
0
0.0
0
0.0
0
0.0
5
1,840.0
4
88.4
2
625.0
0
0.0
0
0.0
10
3,659.0
21
6,212.4
LOU
PROJECTS
COST
($1,000)
0
0.0
0
0.0
0
0.0
0
0.0
0
0.0
1
1,550.0
0
0.0
2
39.0
0
0.0
3
1,589.0
TOTAL
PROJECTS
COST
($1,000)
1
400.0
1
2,200.0
6
2,895.0
16
9,319.0
6
518.4
3
2,175.0
1
360.0
2
39.0
13
7,359.0
49
25,265.4
*  SEE SECTION III FOR  DEFINITIONS OF COMPLIANCE STATUS CATEGORIES

-------
       NASA  -   TABLE  2:
                          NUMBER AND DOLLAR AMOUNT OF  POLLUTION ABATEMENT  PROJECTS  FOR  FEDERAL INSTALLATIONS
                          PROPOSED BY MAJOR COMMAND/BUREAU FOR  FISCAL  YEAR  1991 BY  CLASS/COMPLIANCE STATUS.*

                                          NATIONAL AERONAUTICS  & SPACE ADMINISTRATION
                                                                                                                          NASA-7
MAJOR
BUREAU

NASA
TOTAL
COMMAND/
CMPA
PROJECTS
COST
(SI, 000)
1
400.0
1
400.0
CLASS I
INOV
PROJECTS
COST
(91, 000)
1
Z, 200.0
1
Z, 200.0
ESDP
	
PROJECTS
COST
($1,000)
6
2,895.0
6
2,895.0
CLASS
ESDF
PROJECTS
COST
($1,000)
16
9,319.0
16
9,319.0
II
PSDF
PROJECTS
COST
($1,000)
6
518.4
6
518.4
ESRO
PROJECTS
COST
($1,000)
3
2,175.0
3
2,175.0
CLASS
ESRE
PROJECTS
COST
($1,000)
1
360.0
1
360.0
III
ESDL
PROJECTS
COST
($1,000)
2
39.0
2
39.0
OTHR
PROJECTS
COST
($1,000)
13
7,359.0
13
7,359.0
TOTAL
PROJECTS
COST
($1,000)
	
49
25,265.4
	
49
25,265.4
* SEE SECTION III FOR DEFINITIONS OF COMPLIANCE STATUS CATEGORIES

-------
                                                                                                       NASA-8
NASA - TABLE 3: NUMBER AND DOLLAR AMOUNT OF POLLUTION ABATEMENT PROJECTS PROPOSED BY
                MAJOR COMMAND/BUREAU AND ENVIRONMENTAL MEDIA FOR FISCAL YEAR 1991

                                NATIONAL AERONAUTICS & SPACE ADMINISTRATION
MAJOR COMMAND/
BUREAU AIR

NASA
TOTAL
PROJECTS
COST
($1,000)
7
3666 . 9
7
3666.9
DRINKING
HATER
PROJECTS
COST
($1,000)
1
50.0
1
50.0
NOISE
PROJECTS
COST
($1,000)
1
30.0
1
30.0
PESTICIDES
PROJECTS
COST
($1,000)
1
60.0
1
60.0
RADIATION CERCLA
PROJECTS PROJECTS
COST COST
($1,000) ($1,000)
6
4660.0
6
4660.0
RCRA
PROJECTS
COST
($1,000)
20
9216.0
20
9216.0
TSCA
PROJECTS
COST
($1,000)
2
620.0
2
620.0
WATER
PROJECTS
COST
($1,000)
10
6914.5
10
6914.5
MULTI
PROJECTS
COST
($1,000)
1
48.0
1
48.0
TOTAL
PROJECTS
COST
($1,000)
49
25265.4
49
25265.4

-------
                                 FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                         NATL AERONAUTICS & SPACE ADMIN          NATIONAL AERONAUTICS & SPACE ADMINI
                                                                     NASA-9
                 PROJECT  IDENTIFICATION
                     REQ    EST   PROJECT
  BUDGET     COMPL   COMPL  COMPL ASSESS- MEDIA
(THOUSANDS)   STATUS  DATE   DATE   MENT    TYPE
                            ADEQUACY  OF  PROJECT
                          ENGIN-
                          EERING    TIME      COST
AL-800013863  PROJECT: MSFC-29
PROVIDE  LUST  LEAK DETECTION SYSTEM
ACCT: OTHER
MARSHALL SPACE FLIGHT CENTER
HUNTSVILLE                       AL

AL-800013863  PROJECT: MSFC-35
CENTRAL WASTEWATER TREATMENT PLANT
ACCT: OTHER
MARSHALL SPACE FLIGHT CENTER
HUNTSVILLE                       AL

CA-80000503<+  PROJECT: AMES-3
HAZ SUB SECONDARY CONTAINMENT, VARIOUS BLDGS
ACCT: OTHER
AMES RESEARCH CENTER
MOFFET FIELD                     CA

CA-800005034  PROJECT: AMES-6
OIL/WATER SEPARATION SYSTEM
ACCT: OTHER
AMES RESEARCH CENTER
MOFFET FIELD                     CA

CA-800005036  PROJECT: DFRF12
HAZARDOUS WASTE/MATERIALS STORAGE SITES
ACCT: OTHER
DRYDEN FLIGHT RESEARCH FACILITY
EDWARDS, CA                      CA

CA-800013030  PROJECT: FY91PESTOG
PESTICIDE STORAGE FACILITY UPGRADE
ACCT: OTHER
JET PROPULSION LABORATORY
PASADENA                         CA
       50.0  ESDF   91/04  90/09   HIGH    SOLID    ADEQUATE  ADEQUATE   ADEQUATE
                                         WASTE     DESIGN    TIMING    ESTIMATE
    2,500.0  OTHR
      600.0   ESDP
    1,700.0   ESDP
      145.0   ESDF
       60.0   ESDP
91/09  HIGH    WATER    ADEQUATE   ADEQUATE   ADEQUATE
                         DESIGN     TIMING    ESTIMATE
                           91/06  HIGH    SOLID    ADEQUATE  ADEQUATE   ADEQUATE
                                         WASTE     DESIGN    TIMING    ESTIMATE
91/06  HIGH    WATER    ADEQUATE   ADEQUATE   ADEQUATE
                         DESIGN    TIMING    ESTIMATE
91/01  HIGH    SOLID    ADEQUATE   ADEQUATE    ADEQUATE
               WASTE     DESIGN    TIMING     ESTIMATE
91/06  HIGH  PESTICIDES ADEQUATE   ADEQUATE    ADEQUATE
                         DESIGN    TIMING     ESTIMATE

-------
                                 FEDERAL AGENCY  POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                         NATL AERONAUTICS * SPACE ADMIN          NATIONAL AERONAUTICS & SPACE ADMINI
                                                                     NASA-10
                PROJECT IDENTIFICATION
                     REQ    EST   PROJECT
  BUDGET     COMPL   COMPL  COMPL ASSESS- MEDIA
(THOUSANDS)  STATUS  DATE   DATE  MENT    TYPE
                            ADEQUACY OF PROJECT
                          ENGIN-
                          EERING    TIME      COST
CA-800013030 PROJECT: JPL-1
ARROYO SECO GROUNDWATER CONTAMINATION
ACCT: OTHER
JET PROPULSION LABORATORY
PASADENA                         CA

CA-800013030 PROJECT: FY88MINOG
WASTE MINIMIZATION/RECYCLING UNIT PURCHASE
ACCT: OTHER
JET PROPULSION LABORATORY
PASADENA                         CA

CA-800019419 PROJECT: NIP-RI-524
INSTALL NOX CONTROL SYSTEMS ON BOILERS
ACCT: OTHER
NASA INDUSTRIAL PLANT
DOWNEY                           CA

CA-800019419 PROJECT: NIP-RI-517
FREON VAPOR RECOVERY/RECYCLING SYSTEM
ACCT: OTHER
NASA INDUSTRIAL PLANT
DOWNEY                           CA

CA-800019419 PROJECT: NIP-RI-518
SEWERLINE REPLACEMENT
ACCT: OTHER
NASA INDUSTRIAL PLANT
DOWNEY                           CA

CA-800019419 PROJECT: Nip-Ri-522
CHROME REMOVAL FROM WASTEWATER
ACCT: OTHER
NASA INDUSTRIAL PLANT
DOWNEY                           CA
    2*000.0  ESDF
       45.0  ESDP
                           92/09  HIGH     CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
                           92/04   HIGH     SOLID    ADEQUATE  ADEQUATE   ADEQUATE
                                          WASTE     DESIGN    TIMING    ESTIMATE
      130.0   PSDF   91/03  91/03   HIGH     AIR     ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
       25.9  ESDL
      225.0   ESRO
       13.1   ESDL
                           92/12   LOW
                                          AIR
91/12 MEDIUM   WATER
                                                  ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
                                                  ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
91/12  LOW     WATER    ADEQUATE  ADEQUATE   ADEQUATE
                         DESIGN   TIMING    ESTIMATE

-------
                                 FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                         NATL AERONAUTICS £ SPACE ADMIN          NATIONAL AERONAUTICS & SPACE  ADMINI
                                                                     NASA-11
                 PROJECT  IDENTIFICATION
                     REQ     EST   PROJECT
  BUDGET     COMPL    COMPL   COMPL ASSESS- MEDIA
(THOUSANDS)   STATUS   DATE    DATE  MENT    TYPE
                            ADEQUACY OF  PROJECT
                          ENGIN-
                          EERING    TIME      COST
CA-800019423  PROJECT: SSFL000001
ABATING GROUNDWATER CONTAMINATION AT S 3FL
ACCT: OTHER
SANTA SUSAN SITE
CHATSWORTH                       CA

CA-800019423  PROJECT: SSFL000004
EXPANDING RCRA CONTAINER STORAGE AREA
ACCT: OTHER
SANTA SUSAN SITE
CHATSWORTH                       CA

CA-800024504  PROJECT: FY87TANKEF
UNDERGROUND TANK MONITORING AND REMEDIATION
ACCT: OTHER
JET PROPULSION LAB EDWARDS FAC
EDWARDS                          CA

CA-800024504  PROJECT: ETSHMSF091
CONSTRUCT HAZARDOUS MAT. STORAGE FAC. ETS
ACCT: OTHER
JET PROPULSION LAB EDWARDS FAC
EDWARDS                          CA

FL-800014585  PROJECT: PCN95576
WILSON CORNERS GROUNDWATER CONTAM.REMEDIAL ACJ.
ACCT: OTHER
JOHN F. KENNEDY SPACE CENTER
KENNEDY SPACE CENTER FL          FL

FL-800014585  PROJECT: PCN95220
FLIGHT CREW RESCUE TRAINING AREA STUDY/CLEANUP
ACCT: OTHER
JOHN F. KENNEDY SPACE CENTER
KENNEDY SPACE CENTER FL          FL
    1,000.0   ESDF
      360.0   ESRE
      250.0   ESDP
      240.0   ESDP
      400.0   CMPA
      200.0   ESDF
91/09  HIGH    CERCLA   ADEQUATE  ADEQUATE    ADEQUATE
                         DESIGN    TIMING     ESTIMATE
                           91/02  HIGH    SOLID    ADEQUATE  ADEQUATE   ADEQUATE
                                         WASTE     DESIGN    TIMING    ESTIMATE
90/09  HIGH    SOLID    ADEQUATE   ADEQUATE   ADEQUATE
               WASTE     DESIGN    TIMING    ESTIMATE
92/01  HIGH    SOLID    ADEQUATE   ADEQUATE   ADEQUATE
               WASTE     DESIGN    TIMING    ESTIMATE
94/12  HIGH    CERCLA   ADEQUATE   ADEQUATE    ADEQUATE
                         DESIGN    TIMING     ESTIMATE
                          91/12  HIGH    CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE

-------
                                 FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                         NATL AERONAUTICS ft SPACE ADMIN          NATIONAL AERONAUTICS ft SPACE ADMINI
                                                                     NASA-12
                PROJECT IDENTIFICATION
                     REQ    EST   PROJECT
  BUDGET     COMPL   COMPL  COMPL ASSESS- MEDIA
(THOUSANDS)  STATUS  DATE   DATE   MENT    TYPE
                            ADEQUACY OF PROJECT
                          ENGIN-
                          EERING    TIME      COST
FL-800014585 PROJECT: PCN 95232
RANSOM ROAD LANDFILL
ACCT; OTHER
JOHN F. KENNEDY SPACE CENTER
KENNEDY SPACE CENTER FL          FL

FL-800014585 PROJECT: PCN95652
INSTALL SECONDARY CONTAINMENT FOR HW TANKS
ACCT: OTHER
JOHN F. KENNEDY SPACE CENTER
KENNEDY SPACE CENTER FL          FL

LA-800014587 PROJECT: 91SUBPG134
REPLACE BLOG. 351 ROOF (ASBESTOS ABATEMENT)
ACCT: OTHER
MICHOUD ASSEMBLY FACILITY
NEW ORLEANS                      LA

LA-800014587 PROJECT: 91SUBPG168
MODIFY ABOVE GROUND STORAGE TANKS
ACCT: OTHER
MICHOUD ASSEMBLY FACILITY
NEW ORLEANS                      LA

LA-800014587 PROJECT: 92COFPG168
MODIFY ABOVE GROUND STORAGE TANKS
ACCT: OTHER
MICHOUD ASSEMBLY FACILITY
NEW ORLEANS                      LA

LA-800014587 PROJECT: 92COFPG164
INSTALL ADDITIONAL ABATEMENT AND MONITOR WELLS
ACCT: OTHER
MICHOUD ASSEMBLY FACILITY
NEW ORLEANS                      LA
    2,200.0  INOV
      300.0  PSDF
92/10  HIGH    SOLID    ADEQUATE  ADEQUATE    ADEQUATE
               WASTE     DESIGN    TIMING    ESTIMATE
                           91/06   HIGH
    1,550.0  ESRO   92/03  91/10   LOW
       96.0  ESDF
       96.0  ESDF
       24.0   ESDF
                                         SOLID
                                         WASTE
                AIR
91/10 MEDIUM   SOLID
               WASTE
                           91/10 MEDIUM   SOLID
                                         WASTE
                        ADEQUATE  ADEQUATE    ADEQUATE
                         DESIGN    TIMING    ESTIMATE
                        ADEQUATE   ADEQUATE   ADEQUATE
                         DESIGN    TIMING    ESTIMATE
                                                  ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
                        ADEQUATE   ADEQUATE   ADEQUATE
                         DESIGN   TIMING    ESTIMATE
                           91/11  HIGH    SOLID    ADEQUATE  ADEQUATE   ADEQUATE
                                         WASTE     DESIGN    TIMING    ESTIMATE

-------
                                  FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                          NATL  AERONAUTICS & SPACE ADMIN          NATIONAL AERONAUTICS & SPACE ADMINI
                                                                     NASA-13
                 PROJECT IDENTIFICATION
                     REQ    EST    PROJECT
  BUDGET     COMPL   COMPL  COMPL  ASSESS- MEDIA
(THOUSANDS)   STATUS  DATE    DATE   MENT    TYPE
                            ADEQUACY  OF  PROJECT
                          ENGIN-
                          EERING   TIME      COST
 LA-800Q14587  PROJECT:  91SUBP6112
 RPLACE UNDERGROUND  CHEMICAL  STORAGE TANKS
 ACCT: OTHER
 MICHOUD ASSEMBLY  FACILITY
 NEW ORLEANS                       LA

 LA-800014587  PROJECT:  90SUB-P679
 MODIFY CHEMICAL WASTE  SYSTEM
 ACCT: OTHER
 MICHOUD ASSEMBLY  FACILITY
 NEW ORLEANS                       LA

 LA-800014587  PROJECT;  91SUBP6116
MODIFY CHEMICAL WASTE  SYSTEM FOR  PRODUCTION ARE
ACCT: OTHER
MICHOUD ASSEMBLY  FACILITY
NEW ORLEANS                       LA

 LA-8000145S7  PROJECT:  91SUBPS170
MODS TO BULK CONTAINER STORAGE AREA (218)
ACCT: OTHER
MICHOUD ASSEMBLY  FACILITY
NEW ORLEANS                       LA

MD-800013865 PROJECT:  91GVAZ
ASBESTOS REMOVAL, VARIOUS BLDGS-6SFC
 ACCT: OTHER
 GODDARD SPACE FLIGHT CENTER
 GREENBELT                        MD

NM-800019434 PROJECT: WSTF022
CONTAMINATION ASSESSMENT
ACCT: OTHER
WHITE SANDS TEST  FACILITY
 LAS CRUCES                       MM
      410.0  OTHR
      800.0   OTHR
                           91/10  MEDIUM   SOLID    ADEQUATE  ADEQUATE   ADEQUATE
                                         WASTE     DESIGN    TIMING    ESTIMATE
                           90/09 MEDIUM   SOLID    ADEQUATE  ADEQUATE   ADEQUATE
                                         WASTE     DESIGN    TIMING    ESTIMATE
    1,400.0   ESDF    92/02   91/10  HIGH    WATER    ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
       18.4   PSDF    92/11   91/11 MEDIUM   WATER
      400.0   OTHR
    1,000.0   ESDF
                           90/09  HIGH     AIR
                                                  ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
                                                  ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
94/11  HISH    SOLID     UNDER    ADEQUATE      LOW
               WASTE     DESIGN    TIMING    ESTIMATE

-------
                                 FEDERAL AGENCY POLLUTION ABATEMENT PUN FOR FISCAL YEAR 1991

                         NATL AERONAUTICS & SPACE ADMIN          NATIONAL AERONAUTICS 4 SPACE ADMINI
                                                                     NASA-14
                PROJECT IDENTIFICATION
                     REQ    EST   PROJECT
  BUDGET     COMPL   COMPL  COMPL ASSESS- MEDIA
(THOUSANDS)  STATUS  DATE   DATE   MENT    TYPE
                            ADEQUACY OF PROJECT
                          ENGIN-
                          EERING    TIME      COST
NM-800019434 PROJECT: WHAT-01
REPLACE 200 AREA SCRUBBERS
ACCT: OTHER
WHITE SANDS TEST FACILITY
LAS CRUCES
                                 NM
NM-800019434 PROJECT: WSTF007
UPGRADE PROPELLANT t CLEANUP WASTE TREATMENT FA
ACCT: OTHER
WHITE SANDS TEST FACILITY
LAS CRUCES                       NM

NM-800019434 PROJECT: WSTF008
ENVIRONMENTAL COMPLIANCE TASKS
ACCTs OTHER
WHITE SANDS TEST FACILITY
LAS CRUCES                       NM

OH-800005035 PROJECT: 92LVCZ
ASBESTOS REMOVAL LEWIS RESEARCH CENTER
ACCT: OTHER
LEWIS RESEARCH CENTER
CLEVELAND                        OH

OH-800005035 PROJECT: 92LVBZ
POLLUTION CONTROL EQUIPMENT REPLACEMENT
ACCT: OTHER
LEWIS RESEARCH CENTER
CLEVELAND                        OH

OH-800005035 PROJECT: 92LVDZ
INSTALL NOISE ABATEMENT SYSTEMS, VARIOUS LOCATI
ACCT: OTHER
LEWIS RESEARCH CENTER
CLEVELAND                        OH
       60.0  OTHR
      800.0  OTHR
      140.0   OTHR
                           90/09 MEDIUM    SOLID    ADEQUATE  ADEQUATE   ADEQUATE
                                          WASTE     DESIGN    TIMING    ESTIMATE
                           90/09   HIGH    SOLID
                                         WASTE
90/09 MEDIUM   SOLID
               WASTE
       51.0   OTHR    93/01   91/09 MEDIUM    AIR
       48.0   OTHR    92/01   91/09 MEDIUM  MULTI
                                        MEDIA
       30.0   OTHR    93/01  91/09 MEDIUM   NOISE
                        ADEQUATE  ADEQUATE   ADEQUATE
                         DESIGN    TIMING    ESTIMATE
                                                  ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
                                                    NOT       NOT
                                                   AVAIL     AVAIL
                          NOT
                         AVAIL
                                                    NOT
                                                   AVAIL
 NOT
AVAIL
                                   NOT
                                  AVAIL
                                              NOT
                                             AVAIL
 NOT
AVAIL
            NOT
           AVAIL

-------
                                 FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                          NATL AERONAUTICS & SPACE ADMIN          NATIONAL AERONAUTICS & SPACE  ADMINI
                                                                     NASA-15
                 PROJECT  IDENTIFICATION
                     REG)     EST    PROJECT
  BUDGET     COMPL    COMPL   COMPL  ASSESS- MEDIA
(THOUSANDS)   STATUS   DATE    DATE   MENT    TYPE
            ADEQUACY OF PROJECT
          ENGIN-
          EERING    TIME      COST
OH-800005035  PROJECT:  92LVAZ
PCB  HYDRAULIC SYSTEMS  CONTAMINATION
ACCT:  OTHER
LEWIS  RESEARCH CENTER
CLEVELAND                        OH

OH-800005035  PROJECT:  92LVEZ
REPAIR OF SANITARY SEWER SYSTEMS LERC/PBS
ACCT: OTHER
LEWIS RESEARCH CENTER
CLEVELAND                        OH

OH-800005035  PROJECT:  91LVAZ
OIL SEPARATOR  SYSTEMS  REPAIR VARIOUS LOCATIONS
ACCT: OTHER
LEWIS RESEARCH CENTER
CLEVELAND                        OH

TX-800016125 PROJECT:  92ENV3
CONTROL OF VOLATILE ORGANIC EMISSIONS.
ACCT: OTHER
NASA JOHNSON SPACE CENTER
HOUSTON TX                       TX

TX-800016125 PROJECT: 88JM86019
ASBESTOS ABATEMENT, BUILDING 2
ACCT: OTHER
NASA JOHNSON SPACE CENTER
HOUSTON TX                       TX

TX-800016125 PROJECT:  92ENV2
UPGRADE POTABLE WATER SUPPLY SYSTEM (B-322)
ACCT: OTHER
NASA JOHNSON SPACE CENTER
HOUSTON TX                       TX
       20.0   OTHR    93/01   91/09 MEDIUM   TOXIC    ADEQUATE  ADEQUATE   ADEQUATE
                                       SUBSTANCE   DESIGN    TIMING    ESTIMATE
       48.0   ESDF    93/09   91/10 MEDIUM   WATER    ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
      600.0   OTHR
       10.0   PSDF
    1,500.0   OTHR
       50.0   PSDF
                           91/09 MEDIUM   WATER    ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
                           91/09 MEDIUM
                           91/09 MEDIUM
                                          AIR
AIR
                                                    NOT
                                                   AVAIL
                    NOT
                   AVAIL
 NOT
AVAIL
        ADEQUATE  ADEQUATE   ADEQUATE
         DESIGN    TIMING    ESTIMATE
                           91/09 MEDIUM  DRINKING  ADEQUATE  ADEQUATE   ADEQUATE
                                         WATER     DESIGN    TIMING    ESTIMATE

-------
                                 FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                         NATL AERONAUTICS & SPACE ADMIN          NATIONAL AERONAUTICS & SPACE ADMINI
                                                                     NASA-16
                PROJECT IDENTIFICATION
                     REQ    EST    PROJECT
  BUDGET     COMPL   COMPL  COMPL  ASSESS- MEDIA
(THOUSANDS)   STATUS  DATE   DATE   MENT    TYPE
                            ADEQUACY OF PROJECT
                          ENGIN-
                          EERING    TIME      COST
TX-800016125 PROJECT: 91JVYZ
PROVIDE ABRASIVE BLASTING FACILITY
ACCT: OTHER
NASA JOHNSON SPACE CENTER
HOUSTON TX                       TX

TX-800016125 PROJECT: 90JVD88062
CONTAMINATION ASSESSMENT/REMEDIATION-TTA
ACCT: OTHER
NASA JOHNSON SPACE CENTER
HOUSTON TX                       TX

TX-800016125 PROJECT: 89ENV01
REMOVE/REPLACE UNDERGROUND TANKS,VAR.BLDGS
ACCT: OTHER
NASA JOHNSON SPACE CENTER
HOUSTON TX                       TX

TX-800016125 PROJECT: 92ENV1
ESTUARY PROTECTION COMPLIANCE PROGRAM
ACCT: OTHER
NASA JOHNSON SPACE CENTER
HOUSTON TX                       TX

VA-800005033 PROJECT: WHAT89-14
REPLACE AND DISPOSE OF PCB EQUIPMENT VARLOC
ACCT: OTHER
NASA LANGLEY RESEARCH CENTER
HAMPTON, VA                      VA

VA-800010763 PROJECT: 91WVAZ
AVIATION FUEL STORAGE CONTAMINATION REMOVAL
ACCT: OTHER
GODDARD SPACE FLIGHT CENTER-WALLLOPS
WALLOPS ISLAND,  VA               VA
      860.0  ESDF
                           90/09   HIGH
      200.0   ESDF    84/11   90/09  HIGH
                                         CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
               CERCLA   ADEQUATE  ADEQUATE    ADEQUATE
                         DESIGN    TIMING    ESTIMATE
      100.0   ESDF    88/10   91/09 MEDIUM   SOLID    ADEQUATE  ADEQUATE   ADEQUATE
                                         WASTE     DESIGN    TIMING    ESTIMATE
       10.0   PSDF
91/09 MEDIUM   WATER    ADEQUATE  ADEQUATE    ADEQUATE
                         DESIGN    TIMING     ESTIMATE
      600.0   ESDF    91/10   91/10  HIGH    TOXIC    ADEQUATE  ADEQUATE   ADEQUATE
                                       SUBSTANCE   DESIGN    TIMING    ESTIMATE
    1,500.0   ESDF
91/07 MEDIUM   SOLID    ADEQUATE  ADEQUATE    ADEQUATE
               WASTE     DESIGN    TIMING    ESTIMATE

-------
                                 FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR  1991

                         NATL AERONAUTICS & SPACE ADMIN          NATIONAL AERONAUTICS  & SPACE  ADMINI
                                                                     NASA-17
                PROJECT IDENTIFICATION
                     REQ    EST    PROJECT
  BUDGET     COMPL   COMPL  COMPL  ASSESS- MEDIA
(THOUSANDS)   STATUS  DATE    DATE   MENT    TYPE
  ADEQUACY OF PROJECT
ENGIN-
EERING    TIME      COST
VA-800010763 PROJECT: 91WVCZ
FUELING AND WASHING APRON - REPAIRS
ACCT: OTHER
GODDARD SPACE FLIGHT CENTER-WALLLOPS
WALLOPS ISLAND, VA               VA

*     TOTAL, NATIONAL AERONAUTICS t SPACE ADMINI
                                                      400.0  ESRO
              25,265.4
                           91/07  MEDIUM   WATER    ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
                                           49
      TOTAL, NATL AERONAUTICS t SPACE ADMIN
              25,265.4
                                           49

-------
COE

-------
   CORPS OF
ENGINEERS (CIVIL)
          run-run

-------
                                                       COE-1
THE CORPS OF ENGINEERS (CIVIL WORKS)

The Corps of Engineers, Civil Works (COE, CIVIL) is a Department
of the Army civil function which is responsible for 1,264
installations comprising about 5.5 million acres of land. They
are also responsible for 9,903 buildings containing about 13.9
million square feet of floor space.

AGENCY POLLUTION ABATEMENT PLAN FOR FY 1991

The Corps of Engineers, Civil Works proposed 16 projects
totalling $333 thousand in their FY 1991 environmental plan.

EPA evaluated the projects submitted by COE, Civil according to
the impact on the local environment that would result if the
projects were not funded in FY 1991.  EPA rated the 16 projects
(budgeted at $333 thousand) as having a "Medium" environmental
impact.

The distribution of projects across compliance classes indicates
that there is one Class I project, those in the plan for current
compliance reasons, or 6 percent of the total number of projects
in the FY 1991 plan.  The 14 Class II projects, those in the plan
to permit the agency to meet near-term future compliance
deadlines, make up 88 percent of the total; and the one Class III
project, those in the plan for other environmental reasons, make
up the remaining 6 percent of the total.

The projects proposed by COE, Civil in their FY 1991 plan are
clustered in two environmental media programs in the following
pattern:  14 projects are proposed in the RCRA area, costing
about $141 thousand; plus two projects in the water area, costing
$192 thousand.

-------
                                                                                     COE-2
                         TOTAL NUMBER OF POLLUTION ABATEMENT

                           PROJECTS PROPOSED FOR FY 1987 - 91

                             CORPS OF ENGINEERS (CIVIL WORKS)
        20
   (0
   UI

   3
   
-------
                                                                                        COE
                            TOTAL DOLLARS REQUESTED FOR POLLUTION

                              ABATEMENT PROJECTS FOR FY 1987 - 91

                                CORPS OF ENGINEERS (CIVIL WORKS)
o
o
o
W
tr
O
Q
          1400
          1200-
          1000 -
           800-
600-
           400-
           200-
                    FY87
                        FY88
FY89
FY90
FY91
    COEFIG2
                                                 RSCALYEARS

-------
                                                                                      COE-4
                         TOTAL NUMBER AND DOLLARS PROPOSED FOR
                         POLLUTION ABATEMENT NEEDS FOR FY 1991
                            CORPS OF ENGINEERS (CIVIL WORKS)
                                                                    333
         10
COEFIG3
       100

NUMBER of PROJECTS

DOLURS REQUESTED ($000)
1000

-------
                                                                                         COE-5
                            TOTAL NUMBER AND DOLLARS PROPOSED FOR
                                CLASS I, II, III PROJECTS FOR FY 1991
                                  CORPS OF ENGINEERS (CIVIL WORKS)
        CLASS I
                                                                 100
        CLASS II
       CLASS I
                                                               100
                                            1000
CQEFIG4
PROJECTS
DOLLARS ($000)

-------
                                                                                   COE-6
   COE  - TABLE 1: EPA EVALUATION OF THE ENVIRONMENTAL IMPACT OF PROPOSED
                   POLLUTION ABATEMENT PROJECTS FOR FISCAL YEAR 1991
                   INCLUDING NUMBER AND COST
                         CORPS OF ENGINEERS (CIVIL WORKS)
COMPLIANCE «
STATUS

ESDP
ESDF
ESRO
GRAND TOTAL
HIGH
PROJECTS
COST
($1,000)
0
0.0
0
0.0
0
0.0
0
0.0
MEDIUM
PROJECTS
COST
($1,000)
I
100.0
14
141.0
1
92.0
16
333.0
LOW
PROJECTS
COST
($1,000)
0
0.0
0
0.0
0
0.0
0
0.0
TOTAL
PROJECTS
COST
($1,000)
1
100.0
14
141.0
1
92.0
16
333.0
*  SEE SECTION III FOR  DEFINITIONS OF COMPLIANCE STATUS CATEGORIES

-------
        COE  -  TABLE 2:
                          NUMBER AND DOLLAR AMOUNT OF POLLUTION ABATEMENT PROJECTS  FOR  FEDERAL  INSTALLATIONS
                          PROPOSED BY MAJOR COMMAND/BUREAU FOR  FISCAL YEAR 1991  BY  CLASS/COMPLIANCE STATUS.*

                                          CORPS OF ENGINEERS (CIVIL WORKS)
                                                                                                                          COE-7
MAJOR
BUREAU

USCOE,
TOTAL
COMMAND/
CMPA
PROJECTS
COST
($1,000)
CIVIL

CLASS I
INOV
PROJECTS
COST
(SI, 000)


ESDP
PROJECTS
COST
($1,000)
___ 	 	
1
100.0
. 	 	 	
1
100.0
CLASS
ESDF
PROJECTS
COST
($1,000)
14
141.0
14
141.0
	
II
PSDF
PROJECTS
COST
($1,000)
	

ESRO
PROJECTS
COST
($1,000)
1
92.0
, 	 „ 	 , 	
1
92.0
CLASS
ESRE
PROJECTS
COST
($1,000)


III
ESDL
PROJECTS
COST
($1,000)


	
OTHR
PROJECTS
COST
($1,000)

=, _
TOTAL
PROJECTS
COST
($1,000)
16
333.0
16
333.0
* SEE SECTION III FOR DEFINITIONS OF COMPLIANCE STATUS CATEGORIES

-------
                                                                                                                    COE-8
              COE  - TABLE 3: NUMBER AND DOLLAR AMOUNT OF POLLUTION ABATEMENT PROJECTS  PROPOSED BY
                              MAJOR COMMAND/BUREAU AND ENVIRONMENTAL MEDIA FOR FISCAL YEAR  1991

                                              CORPS OF ENGINEERS (CIVIL WORKS)

MAJOR COMMAND/         DRINKING
BUREAU         AIR      WATER      NOISE  PESTICIDES RADIATION  CERCLA     RCRA     TSCA     WATER     MULTI     TOTAL

             PROJECTS  PROJECTS  PROJECTS  PROJECTS  PROJECTS  PROJECTS  PROJECTS  PROJECTS  PROJECTS  PROJECTS  PROJECTS
               COST      COST      COST      COST      COST      COST      COST     COST      COST      COST      COST
             ($1,000)  ($1,000)  ($1,000)  ($1,000)  ($1,000)  ($1,000)  ($1,000)  ($1,000)  ($1,000)  ($1,000)  ($1,000)

USCOE, CIVIL                                                                 14                  2                  16
                                                                            141.0              192.0               333.0

TOTAL                                                                        14                  Z                  16
                                                                           141.0              192.0               333.0

-------
                                  FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR  1991

                          CORPS OF ENGINEERS, CIVIL               CORPS OF ENGINEERS (CIVIL WORKS)
                 PROJECT  IDENTIFICATION
                                    REQ    EST   PROJECT
                 BUDGET     COMPL   COMPL  COMPL ASSESS- MEDIA
               (THOUSANDS)  STATUS  DATE   DATE  MENT    TYPE
                                                                                    COE-9
                            ADEQUACY  OF  PROJECT
                          ENGIN-
                          EERING    TIME      COST
 OK-9600120Z6  PROJECT:  05650A
 BULL  CREEK  COAL MINE
 ACCT: 0  S M
 EUFAULA  LAKE
 EUFAULA
PA-960010060 PROJECT:
DAY USE AREA
ACCT: 0 & M
CROOKED CREEK  LAKE
FORD CITY
                      04280A
                                 OK
PA
PA-960010080 PROJECT: ORP—18260
RENEW TANK
ACCT: 0 & M
TIONESTA LAKE
TIONESTA                         PA

WV-960009996 PROJECT: ORH
CORRECTIVE ACTION - 4 TANKS (REMOVE)
ACCT: 0 & M
GALLIPOLIS L+D
GALLIPOLIS FERRY                 WV
WV-960010147 PROJECT: ORH
REMOVE 2 TANKS
ACCT: 0 t M
BLUESTONE LAKE (ORH)
HINTON

WV-960010166 PROJECT: ORH
REMOVE 2 TANKS
ACCT: 0 & M
MARRET L/D
HV
                                 WV
                                                      100.0  ESDP
                                                       92.0  ESRO
                      20.0  ESDF
                      12.0  ESDF
                                                        6.0  ESDF
                       6.0  ESDF
                                          90/09 MEDIUM   WATER     ADEQUATE  ADEQUATE   ADEQUATE
                                                                   DESIGN    TIMING    ESTIMATE
                                          90/09 MEDIUM   WATER     ADEQUATE  ADEQUATE   ADEQUATE
                                                                   DESIGN    TIMING    ESTIMATE
90/09 MEDIUM   SOLID      NOT       NOT        NOT
               WASTE     AVAIL     AVAIL      AVAIL
90/09 MEDIUM   SOLID      NOT       NOT        NOT
               WASTE     AVAIL     AVAIL      AVAIL
                                          90/09 MEDIUM   SOLID       NOT       NOT        NOT
                                                         WASTE      AVAIL     AVAIL      AVAIL
                                          90/09 MEDIUM   SOLID      NOT       NOT        NOT
                                                         WASTE      AVAIL     AVAIL      AVAIL

-------
                                 FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                         CORPS OF ENGINEERS, CIVIL               CORPS OF ENGINEERS (CIVIL WORKS)
                PROJECT IDENTIFICATION
                                    REQ    EST   PROJECT
                 BUDGET     COMPL   COMPL  COMPL ASSESS- MEDIA
               (THOUSANDS)  STATUS  DATE   DATE  MENT    TYPE
                                                                                    COE-10
                            ADEQUACY OF  PROJECT
                          ENGIN-
                          EERING    TIME      COST
WV-960010167 PROJECT: ORH
REMOVE 2 TANKS
ACCT: 0 t M
MARMET LtD (ORH)
BELLE
                                 14V
WV-960010168 PROJECT: ORH
REMOVE Z TANKS
ACCT: 0 & M
RIVER MALL (WINFIELD LOCK & DAM)
RED HOUSE                        WV

WV-960010189 PROJECT: ORH—17840
REMOVE 
-------
                                 FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR  1991

                          CORPS OF ENGINEERS, CIVIL               CORPS OF ENGINEERS (CIVIL WORKS)
                 PROJECT  IDENTIFICATION
                     REQ     EST   PROJECT
  BUDGET     COMPL   COMPL   COMPL ASSESS- MEDIA
(THOUSANDS)   STATUS   DATE    DATE  MENT    TYPE
                                                                     COE-11
                            ADEQUACY OF PROJECT
                          ENGIN-
                          EERING    TIME      COST
WV-960019366  PROJECT:
IMPROVE  2  TANKS
ACCT: 0  «  M
PIKE ISLAND LSD  (ORP)
WHEELING
                      ORP
                                 WV
WV-960020369 PROJECT: ORH--14780
REMOVE 5 TANKS
ACCT: 0 i M
R D BAILEY LAKE (ORH)
JUSTICE                          WV

WV-960020591 PROJECT: ORH—1280
REMOVE 3 TANKS
ACCT: 0 t M
BEECH FORK LAKE (ORH)
LAVALETTE                        WV

WV-960020S43 PROJECT: ORH—2270
REMOVE 3 TANKS
ACCT: 0 & M
BURNSVILLE LAKE (ORH)
BURNSVILLE                       WV

*     TOTAL,  CORPS OF ENGINEERS (CIVIL WORKS)
      TOTAL, CORPS OF ENGINEERS, CIVIL
                                                       25.0  ESDF
                                                       15.0  ESDF
        9.0   ESDF
        9.0   iSDF
                 333.0
                                                                 333.0
                           90/09 MEDIUM   SOLID      NOT       NOT
                                         WASTE     AVAIL     AVAIL
                           90/09 MEDIUM   SOLID      NOT       NOT
                                         WASTE     AVAIL     AVAIL
90/09 MEDIUM   SOLID       NOT       NOT
               WASTE      AVAIL     AVAIL
90/09 MEDIUM   SOLID
               WASTE
                 16


                 16
 NOT       NOT
AVAIL     AVAIL
                                              NOT
                                             AVAIL
                                              NOT
                                             AVAIL
                                                                         NOT
                                                                        AVAIL
                                                                         NOT
                                                                        AVAIL

-------
NAVY

-------
DEPARTMENT OF
    NAVY

-------
                                                       NAVY-1
THE DEPARTMENT OF THE NAVY

The Department of Defense (DOD) controls more federally owned
building space in the United States than any other government
agency, about 1.9 billion square feet of space.  As a part of the
defense establishment, the Department of the Navy (USN) owns
approximately 464 installations in the United States comprising
about 2.4 million acres. They also own 73,862 buildings
containing about 551 million square feet of floor area. In
addition to the property owned by the Navy within the geographic
boundaries of the country, they also own about 67 thousand acres
of land in outlying areas of the U. S.

AGENCY POLLUTION ABATEMENT PLAN FOR FY 1991

The Navy proposed 199 projects totalling $127 million in their A-
106 environmental plan for FY 1991.

The 199 projects proposed by Navy in their FY 1991 plan are
distributed across the various environmental media programs in
the following pattern:  120 CERCLA projects, costing $77 million;
another 32 RCRA projects, costing $6.3 million; 34 water
projects, costing $38.8 million; 7 toxics projects, costing $4
million; 2 pesticide projects, costing $243 thousand; 1 drinking
water project, costing $88 thousand; and 3 air projects, costing
$145 thousand.

EPA evaluated the 199 projects according to the impact on the
local environment that would result if the projects were not
funded in FY 1991.  EPA rated 146 projects  (budgeted at $109
million) as having a "High" environmental impact.  "Medium"
ratings were assigned to 51 projects  ($18 million) and "Low"
ratings to 2 projects ($107 thousand).

The distribution of projects in the Navy plan between compliance
classes indicates that there are 58 Class I projects, those in
the plan for current compliance reasons, or 29 percent of the
total number of projects in the FY 1991 plan.  The 134 Class II
projects, those in the plan to permit the agency to meet near-
term future compliance deadlines, make up 67 percent of the
total; and the 7 Class III projects, those in the plan for other
environmental reasons, make up 4 percent of the total.

-------
                                                                        NAVY-2
                         TOTAL NUMBER OF POLLUTION ABATEMENT

                          PROJECTS PROPOSED FOR FY 1987 - 91

                                   DEPT OF NAVY
           200-
 tfi
 ui

 O
 EC
 Q.

 U.
 O

 OC
 111
 CD
 s

 z
100-
                   FY87
                     FY88
                                             FY89
FY90
                                                           FY91
NAVY FIG 1
                                    FISCAL YEARS

-------
                                                                           NAVY-3
                          TOTAL DOLLARS REQUESTED FOR POLLUTION

                           ABATEMENT PROJECTS FOR FY 1987 - 91

                                   DEPT OF NAVY
         200000
   o
   o
   o
   (A
   C
   O
   Q
         100000 -
iJAVY FIG 2

-------
                                                                                    rmv T -«t
                        TOTAL NUMBER AND DOLLARS PROPOSED FOR
                        POLLUTION ABATEMENT NEEDS FOR FY 1991
                                  DEPT OF NAVY
                                                                 126718
            100
1000
10000
100000
                                                1000000
NAVY FIG 3
          E3  PROJECTS

          •  DOLLARS ($000)

-------
                                                                                          NAVY-5
                            TOTAL NUMBER AND DOLLARS PROPOSED FOR
                              CLASS I, II, III PROJECTS FOR FY 1991
                                       DEPT OF NAVY
       CLASS I
       CLASS II
       CLASS III
                                                                     33143
                                                                          86539
                         10
100
1000
10000
100000
1000000
NAVY FIG 4
       PROJECTS

       DOLLARS ($000)

-------
                                                                                   NAVY-6
   NAVY - TABLE 1: EPA EVALUATION OF THE ENVIRONMENTAL IMPACT OF PROPOSED
                   POLLUTION ABATEMENT PROJECTS FOR FISCAL YEAR 1991
                   INCLUDING NUMBER AND COST
                         DEPARTMENT OF NAVY
COMPLIANCE *
STATUS

ESDP
ESDF
PSDF
ESRO
ESDL
OTHR
GRAND TOTAL
HIGH
PROJECTS
COST
($1,000)
51
32,672.0
90
68,376.0
3
2,568.0
Z
5,236.0
0
0.0
0
0.0
146
108,752.0
MEDIUM
PROJECTS
COST
($1,000)
7
471.0
37
15,562.0
2
26.0
3
500.0
1
1,200.0
1
100.0
51
17,859.0
LOW
PROJECTS
COST
($1,000)
0
0.0
2
107.0
0
0.0
0
0.0
0
0.0
0
0.0
2
107.0
TOTAL
PROJECTS
COST
($1,000)
56
33,143.0
129
83,945.0
5
2,594.0
5
5,736.0
1
1,200.0
1
100.0
199
126,718.0
*  SEE SECTION III FOR  DEFINITIONS OF COMPLIANCE STATUS CATEGORIES

-------
       NAVY -  TABLE  2:
NUMBER AND DOLLAR AMOUNT OF POLLUTION ABATEMENT PROJECTS FOR FEDERAL INSTALLATIONS
PROPOSED BY MAJOR COMMAND/BUREAU FOR FISCAL YEAR 1991  BY CLASS/COMPLIANCE  STATUS.*

                DEPARTMENT OF NAVY
                                                                                                                          NAVY-7
MAJOR COMMAND/
BUREAU CMPA
PROJECTS
COST
($1,000)
DEPT OF NAVY
TOTAL
CLASS I
INOV
PROJECTS
COST
($1,000)


ESDP
PROJECTS
COST
($1,000)
58
33,143.0
58
33,143.0
CLASS
ESDF
PROJECTS
COST
($1,000)
129
83,945.0
129
83,945.0
	
II
PSDF
PROJECTS
COST
($1,000)
	
5
2,594.0
5
2,594.0
ESRO
	
PROJECTS
COST
($1,000)
5
5,736.0
	
5
5,736.0
CLASS
ESRE
PROJECTS
COST
($1,000)


III
ESDL
PROJECTS
COST
($1,000)
1
1,200.0
1
1,200.0
	
OTHR
PROJECTS
COST
($1,000)
1
100.0
1
100.0
	
TOTAL
	
PROJECTS
COST
($1,000)
199
126,718.0
	
199
126,718.0
* SEE SECTION III FOR DEFINITIONS OF COMPLIANCE STATUS CATEGORIES

-------
                                                                                                                    NAVY-8
              NAVY - TABLE 3: NUMBER AND DOLLAR AMOUNT OF POLLUTION ABATEMENT PROJECTS PROPOSED  BY
                              MAJOR COMMAND/BUREAU AND ENVIRONMENTAL MEDIA FOR FISCAL YEAR 1991

                                              DEPARTMENT OF NAVY

MAJOR COMMAND/         DRINKING
BUREAU         AIR      WATER      NOISE  PESTICIDES RADIATION  CERCLA     RCRA      TSCA     WATER      HULTI     TOTAL

             PROJECTS  PROJECTS  PROJECTS  PROJECTS  PROJECTS  PROJECTS  PROJECTS  PROJECTS  PROJECTS   PROJECTS  PROJECTS
               COST      COST      COST      COST      COST      COST      COST      COST     COST      COST      COST
             ($1,000)  ($1,000)  ($1,000)  ($1,000)  ($1,000)  ($1,000)  ($1,000)  ($1,000)  ($1,000)   ($1,000)  ($1,000)
DEPT OF NAVY
TOTAL
3
145.0
3
145.0
1
88.0
1
88. 0
2
243.0
2
243.0
120
77002.0
120
77002.0
32
6301.0
32
6301.0
7
4128.0
7
4128.0
34
38811.0
34
38811.0
199
126718.0
199
126718.0

-------
                                  FEDERAL  AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                          DEPARTMENT OF NAVY                      DEPARTMENT OF NAVY
                 PROJECT IDENTIFICATION
                                    REQ    EST   PROJECT
                 BUDGET     COMPL   COMPL  COMPL ASSESS- MEDIA
               (THOUSANDS)  STATUS  DATE   DATE  MENT    TYPE
                                                                                     NAVY-9
                            ADEQUACY OF PROJECT
                          ENGIN-
                          EERING    TIME      COST
 AK-170024323 PROJECT:  C101B
 RI/FS
 ACCT: DERA
 NAS ADAK AK
 ADAK STATION

 AK-170024323 PROJECT:  T058A
 PCB TRANSFORMER  REPLACEMENT
 ACCT: O&M
 NAS ADAK AK
 ADAK STATION

 AZ-170024493 PROJECT:  C096C
 RD/RA
 ACCT:  DERA
 MCAS YUMA AZ
 YUMA

 CA-170022298 PROJECT:  C174B
 RD/RA
 ACCT:  DERA
 NAVPGSCOL MONTEREY CA
 MONTEREY

 CA-170022298  PROJECT:  C174C
 RI/FS
 ACCT:  DERA
 NAVPGSCOL  MONTEREY CA
 MONTEREY
                                                      100.0  ESDF
                                          90/09  HIGH    CERCLA   ADEQUATE   ADEQUATE   ADEQUATE
                                                                   DESIGN    TIMING   ESTIMATE
CA-170022298 PROJECT:
UST ASSESSMENT/MS
ACCT: DERA
NAVPGSCOL MONTEREY CA
MONTEREY
                      S157D
AK
AK
AZ
CA
                                 CA
CA
                      10.0  ESDF   91/10  90/09  HIGH    TOXIC    ADEQUATE   ADEQUATE    ADEQUATE
                                                       SUBSTANCE   DESIGN    TIMING     ESTIMATE
                   1,390.0  ESDF
                      83.0  ESDF
                     2BO.O  ESDF
90/12  HIGH
                                          91/09  HIGH
                                          90/09  HIGH
                                                      165.0  ESDP   86/01  90/09  HIGH
               CERCLA   ADEQUATE  ADEQUATE    ADEQUATE
                         DESIGN    TIMING    ESTIMATE
                                                         CERCLA   ADEQUATE   ADEQUATE    ADEQUATE
                                                                   DESIGN    TIMING     ESTIMATE
               CERCLA   ADEQUATE  ADEQUATE    ADEQUATE
                         DESIGN    TIMING    ESTIMATE
                                                         SOLID    ADEQUATE   ADEQUATE    ADEQUATE
                                                         WASTE     DESIGN    TIMING    ESTIMATE

-------
                                 FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                         DEPARTMENT OF NAVY                      DEPARTMENT OF NAVY
                PROJECT IDENTIFICATION
                     REQ    EST   PROJECT
  BUDGET     COMPL   COMPL  COMPL ASSESS- MEDIA
(THOUSANDS)  STATUS  DATE   DATE   MENT     TYPE
                                                                                                                      NAVY-10
                            ADEQUACY OF PROJECT
                          ENGIN-
                          EERING    TIME      COST
CA-170022573 PROJECT: C125B
RD/RA
ACCT: DERA
MCRD SAN DIEGO CA
SAN DIEGO                        CA

CA-170022784 PROJECT: C075D
REMOVAL ACTION
ACCT: DERA
NSY HUNTERS POINT SAN FRAN CA
SAN FRANCISCO                    CA

CA-170022915 PROJECT: C097B
RI/FS
ACCT: DERA
NIROP SUNNYVALE CA
SUNNYVALE                        CA

CA-170023118 PROJECT: C041C
RD/RA
ACCT: DERA
NAS NORTH IS SAN DIEGO CA
SAN DIEGO                        CA

CA-170023118 PROJECT: S102A
CONSTRUCT HAZARDOUS WASTE STAGING FACILITY
ACCT: O&M
NAS NORTH IS SAN DIEGO CA
SAN DIEGO                        CA

CA-170023152 PROJECT: C076D
RD/RA
ACCT: DERA
NAVWPNCEN CHINA LAKE CA
CHINA LAKE                       CA
      200.0  ESDF
       40.0  ESDF
      400.0  ESDF
    3,717.0  ESDF
      168.0  ESDP
      700.0  ESDF
                           91/12   HIGH    CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
90/09  HIGH    CERCLA   ADEQUATE  ADEQUATE    ADEQUATE
                         DESIGN    TIMING    ESTIMATE
90/09  HIGH    CERCLA   ADEQUATE   ADEQUATE   ADEQUATE
                         DESIGN    TIMING    ESTIMATE
91/12  HIGH    CERCLA   ADEQUATE   ADEQUATE   ADEQUATE
                         DESIGN    TIMING    ESTIMATE
90/09  HIGH    SOLID    ADEQUATE   ADEQUATE   ADEQUATE
               WASTE     DESIGN    TIMING    ESTIMATE
                           91/12  HIGH    CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE

-------
                                  FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                          DEPARTMENT OF  NAVY                     DEPARTMENT OF NAVY
                 PROJECT IDENTIFICATION
                                    REQ    EST   PROJECT
                 BUDGET     COMPL   COMPL  COMPL ASSESS- MEDIA
                (THOUSANDS)  STATUS  DATE   DATE  MENT    TYPE
                                                                                     NAVY-11
                            ADEQUACY OF  PROJECT
                          ENGIN-
                          EERING    TIME      COST
 CA-170023190 PROJECT:  C040C
 IR  SALARY/SUPPORT REQUIREMENTS
 ACCT:  DERA
 NSY LONG BEACH  CA
 LONG BEACH                       CA
 CA-170023236  PROJECT:  C024C
 RD/RA
 ACCT:  DERA
 NAS  ALAMEDA CA
 ALAMEDA
CA-170023236  PROJECT: C069D
RD/RA
ACCT: DERA
NAS MOFFETT FIELD CA
MOFFETT FIELD

CA-170023238 PROJECT: C069F
REMOVAL ACTION
ACCT: DERA
NAS MOFFETT FIELD CA
MOFFETT FIELD
                                 CA
CA
CA
CA-170023238 PROJECT: S070M
CONSTRUCT HAZARDOUS MATERIAL STORAGE AREAS
ACCT: O&M
NAS MOFFETT FIELD CA
MOFFETT FIELD                    CA

CA-170023278 PROJECT: C175B
RI/FS
ACCT: DERA
NRTF DIXON
DIXON                            CA
                     162.0  ESDF
                   1,288.0  ESDF
                   2,019.0  ESDF
                     160.0  ESDF
                     200.0  ESDP
                     375.0  ESDF
90/09  HIGH    CERCLA   ADEQUATE  ADEQUATE    ADEQUATE
                         DESIGN    TIMING    ESTIMATE
92/04  HIGH    CERCLA   ADEQUATE  ADEQUATE    ADEQUATE
                         DESIGN    TIMING    ESTIMATE
93/01  HIGH    CERCLA   ADEQUATE  ADEQUATE    ADEQUATE
                         DESIGN    TIMING    ESTIMATE
                                          90/09  HIGH    CERCLA   ADEQUATE   ADEQUATE    ADEQUATE
                                                                   DESIGN    TIMING    ESTIMATE
91/03  HIGH    SOLID    ADEQUATE  ADEQUATE   ADEQUATE
               WASTE     DESIGN    TIMING    ESTIMATE
90/09  HIGH    CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
                         DESIGN    TIMING    ESTIMATE

-------
                                 FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                         DEPARTMENT OF NAVY                      DEPARTMENT OF NAVY
                PROJECT IDENTIFICATION
                        REQ    EST   PROJECT
     BUDGET     COMPL   COMPL  COMPL ASSESS- MEDIA
   (THOUSANDS)  STATUS  DATE   DATE  MENT    TYPE
                                                                         NAVY-12
                            ADEQUACY OF PROJECT
                          ENGIN-
                          EERING    TIME      COST
CA-170023323 PROJECT: C100C
RI/FS
ACCT: DERA
CBC PORT HUENEME CA
PORT HUENEME                     CA

CA-170023330 PROJECT: C094B
RI/FS
ACCT: DERA
NAVSTA TREASURE ISLAND CA
SAN FRANCISCO                    CA

CA-170023330 PROJECT: C094C
RD/RA
ACCT: DERA
NAVSTA TREASURE ISLAND CA
SAN FRANCISCO                    CA

CA-170023533 PROJECT: C074E
RD/RA
ACCT: DERA
MCB CAMP PENDLETON CA
CAMP PENDLETON                   CA

CA-170024288 PROJECT: C009C
RD/RA
ACCT: DERA
NSC SAN DIEGO CA
SAN DIEGO                        CA

CA-170024289 PROJECT: C095B
RI/FS
ACCT: DERA
NAVSTA SAN DIEGO CA
SAN DIEGO                        CA
NE
         100.0  ESDF
          50.0  ESDF
       1,132.0  ESDF
       2,500.0  ESDF
         398.0  ESDF
         300.0  ESDF
NE
90/09  HIGH    CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
                         DESIGN    TIMING    ESTIMATE
                              90/09  HIGH    CERCLA   ADEQUATE   ADEQUATE   ADEQUATE
                                                       DESIGN    TIMING    ESTIMATE
91/09  HIGH    CERCLA   ADEQUATE  ADEQUATE    ADEQUATE
                         DESIGN    TIMING    ESTIMATE
95/09  HIGH    CERCLA   ADEQUATE  ADEQUATE    ADEQUATE
                         DESIGN    TIMING     ESTIMATE
                              91/12  HIGH    CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
                                                       DESIGN    TIMING    ESTIMATE
90/09  HIGH    CERCLA   ADEQUATE   ADEQUATE   ADEQUATE
                         DESIGN   TIMING    ESTIMATE

-------
                                  FEDERAL  AGENCY  POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                          DEPARTMENT OF  NAVY                      DEPARTMENT OF NAVY
                 PROJECT IDENTIFICATION
                         REQ    EST   PROJECT
      BUDGET     COMPL   COMPL  COMPL ASSESS-  MEDIA
    (THOUSANDS)  STATUS  DATE   DATE   MENT     TYPE
                                                                                                                      NAVY-13
                            ADEQUACY  OF  PROJECT
                          ENGIN-
                          EERING    TIME     COST
 CA-170024381  PROJECT:  C077E
 RD/RA
 ACCT: DERA
 NAS LEMOORE CA
 LEMOORE                           CA

 CA-17002-+381  PROJECT:  T059B
 PCB TRANSFORMER  REPLACEMENT
 ACCT: O&M
 NAS LEMOORE CA
 LEMOORE                           CA

 CA-170024491  PROJECT:  C078D
 IR  SALARY/SUPPORT REQUIREMENTS
 ACCT:  DERA
 WPNSTA SEAL BEACH CA
 SEAL  BEACH                        CA

 CA-170024491  PROJECT:  C078C
 RD/RA
 ACCT:  DERA
 WPNSTA SEAL BEACH CA
 SEAL  BEACH                        CA

 CA-170024521  PROJECT:  T024A
 HAZARDOUS MATERIAL STORAGE FACILITY
 ACCT:  MILCON
 PWC SAN DIEGO CA
 SAN DIEGO                         CA

 CA-170024528  PROJECT:  C023B
RI/FS
ACCT:  DERA
WPNSTA CONCORD CA
CONCORD                           CA
          639.0  ESDF
92/01  HIGH    CERCLA   ADEQUATE   ADEQUATE   ADEQUATE
                         DESIGN    TIMING    ESTIMATE
(MC
        1,251.0  ESDF   91/10  90/09   HIGH     TOXIC    ADEQUATE  ADEQUATE   ADEQUATE
                                            SUBSTANCE   DESIGN    TIMING    ESTIMATE
           35.0  ESDF
          303.0  ESDF
        1,750.0  ESDP
        1,000.0  ESDF
                               90/09  HIGH     CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
                                                       DESIGN    TIMING    ESTIMATE
                               92/09  HIGH    CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
                                                       DESIGN    TIMING    ESTIMATE
90/09  HIGH    TOXIC    ADEQUATE   ADEQUATE    ADEQUATE
             SUBSTANCE   DESIGN    TIMING     ESTIMATE
90/09  HIGH    CERCLA   ADEQUATE   ADEQUATE    ADEQUATE
                         DESIGN    TIMING     ESTIMATE

-------
                                 FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                         DEPARTMENT OF NAVY                      DEPARTMENT OF NAVY
                PROJECT IDENTIFICATION
                        REQ    EST   PROJECT
     BUDGET     COMPL   COMPL  COMPL ASSESS- MEDIA
   (THOUSANDS)  STATUS  DATE   DATE  MENT    TYPE
                                                                                                                     NAVY-1
                            ADEQUACY OF PROJECT
                          ENGIN-
                          EERING    TIME      COST
CA-170024528 PROJECT: C023C
RD/RA
ACCT: DERA
WPNSTA CONCORD CA
CONCORD                          CA

CA-170024530 PROJECT: C152B
RD/RA
ACCT: DERA
NAF EL CENTRO CA
EL CENTRO                        CA

CA-170024555 PROJECT: C113B
RI/FS
ACCT: DERA
SUBASE SAN DIEGO CA
SAN DIEGO                        CA

CA-170024555 PROJECT: C113C
RD/RA
ACCT: DERA
SUBASE SAN DIEGO CA
SAN DIEGO                        CA

CA-170024696 PROJECT: C219B
3RD PARTY PRP GBF/PITTSBURS LANDFILL
ACCT: DERA
WESTNAVFACENGCOM SAN BRUNO CA
SAN BRUNO                        CA

CA-170024740 PROJECT: C006C
RI/FS
ACCT: DERA
NAS MIRAMAR CA
MIRAMAR                          CA
NE
       5,000.0  ESDF
       1,038.0  ESDF
         100.0  ESDP
       1,100.0  ESDF
          20.0  ESDP
         500.0  ESDF
90/09  HIGH    CERCLA   ADEQUATE  ADEQUATE    ADEQUATE
                         DESIGN    TIMING    ESTIMATE
92/06  HIGH    CERCLA   ADEQUATE  ADEQUATE    ADEQUATE
                         DESIGN    TIMING    ESTIMATE
90/09  HIGH    CERCLA   ADEQUATE   ADEQUATE    ADEQUATE
                         DESIGN    TIMING    ESTIMATE
90/09  HIGH    CERCLA   ADEQUATE   ADEQUATE    ADEQUATE
                         DESIGN    TIMING     ESTIMATE
                              91/01   HIGH    CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
                                                      DESIGN    TIMING    ESTIMATE
                              90/09  HIGH    CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
                                                      DESIGN    TIMING    ESTIMATE

-------
                                  FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                          DEPARTMENT OF NAVY                      DEPARTMENT OF NAVY
                 PROJECT IDENTIFICATION
                                    REQ    EST   PROJECT
                 BUDGET     COMPL   COMPL  COMPL ASSESS- MEDIA
               (THOUSANDS)  STATUS  DATE   DATE  MENT    TYPE
                                                                                     NAVY-15
                            ADEQUACY OF  PROJECT
                          ENGIN-
                          EERING    TIME      COST
 CA-170024750 PROJECT:  C126A
 RI/FS
 ACCT: DERA
 NAVOCEANSYSCEN SAN  DIEGO CA
 SAN DIEGO
                                 CA
 CA-170027254  PROJECT:  S275A
 HAZARDOUS  WASTE/MATERIAL STORAGE BUILDING
 ACCT:  OSM
 NAVMEDCOM  NWREG  OAKLAND CA
 OAKLAND                          CA
CA-170027271  PROJECT: C056C
RI/FS
ACCT: DERA
PACMISTESTCEN PT MUGU CA
POINT MUGU
CA-170027271 PROJECT: C056E
RD/RA
ACCT: DERA
PACMISTESTCEN PT MUGU CA
POINT MUGU

CA-170027271 PROJECT: C056F
IR SALARY/SUPPORT REQUIREMENTS
ACCT: DERA
PACMISTESTCEN PT MUGU CA
POINT MUGU

CA-170027271 PROJECT: S190H
UST REMEDIAL ACTION
ACCT: DERA
PACMISTESTCEN PT MUGU CA
POINT MUGU
                                 CA
CA
CA
CA
            NE
                                                      200.0  ESDF
                                                      11S.O  ESDP
                                                      500.0  ESDF
                                                      174.0  ESDF
                      47.0  ESDF
                     250.0  ESDP
                                          90/09  HIGH    CERCLA   ADEQUATE  ADEQUATE    ADEQUATE
                                                                   DESIGN    TIMING    ESTIMATE
                                          90/09  HIGH    SOLID    ADEQUATE  ADEQUATE    ADEQUATE
                                                         WASTE     DESIGN    TIMING    ESTIMATE
90/09  HIGH    CERCLA   ADEQUATE  ADEQUATE    ADEQUATE
                         DESIGN    TIMING     ESTIMATE
                                          92/12  HIGH    CERCLA   ADEQUATE  ADEQUATE    ADEQUATE
                                                                   DESIGN    TIMING    ESTIMATE
90/09  HISH    CERCLA   ADEQUATE  ADEQUATE    ADEQUATE
                         DESIGN    TIMING     ESTIMATE
                                          90/09  HIGH    SOLID    ADEQUATE  ADEQUATE    ADEQUATE
                                                         WASTE     DESIGN    TIMING    ESTIMATE

-------
                                 FEDERAL AGENCY POLLUTION ABATEMENT PUN FOR FISCAL YEAR 1991

                         DEPARTMENT OF NAVY                      DEPARTMENT OF NAVY
                PROJECT IDENTIFICATION
                     REQ    EST   PROJECT
  BUDGET     COMPL   COMPL  COMPL ASSESS- MEDIA
(THOUSANDS)   STATUS  DATE   DATE  MENT     TYPE
                                                                     NAVY-16
                            ADEQUACY OF PROJECT
                          ENGIN-
                          EERING    TIME      COST
CA-170061447 PROJECT: C224A
IR SALARY/SUPPORT REQUIREMENT
ACCT: DERA
COMNAVBASE SAN FRANCISCO CA
SAN FRANCISCO                    CA

CA-170064228 PROJECT: C143B
RI/FS
ACCT: DERA
NAF SAN CLEMENTE CA
SAN CLEMENTE                     CA

CA-170065S88 PROJECT: SI ISA
CONSTRUCT 10 HW STAGING FACILITIES
ACCT: OtM
NAVAIREWORKFAC NAS NI SD CA
SAN DIEGO                        CA

CT-170022020 PROJECT: P057A
CONSTRUCT GOLF COURSE PEST CONTROL FACILITY
ACCT: OtM
SUBASE NEW LONDON CT
GROTON                           CT

CT-170022020 PROJECT: C034E
RI/FS IR SALARY/SUPPORT REQUIREMENTS
ACCT: DERA
SUBASE HEW LONDON CT
GROTON                           CT

CT-170022020 PROJECT: S021E
HAZARDOUS WASTE TRANSFER FAC.-STATE PIER
ACCT: OtM
SUBASE NEW LONDON CT
GROTON                           CT
       43.0  ESDF
      100.0  ESDF
        5.0   ESDP
                           90/09  HIGH     CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
                           90/09  HIGH     CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
90/09  HIGH    SOLID    ADEQUATE   ADEQUATE   ADEQUATE
               WASTE     DESIGN    TIMING    ESTIMATE
      165.0   ESDP   89/05   90/09  MEDIUM  PESTICIDES ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
      500.0   ESDF
       80.0   ESDP
                           90/09 MEDIUM   CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
                           90/09  HIGH    SOLID    ADEQUATE  ADEQUATE   ADEQUATE
                                         WASTE     DESIGN    TIMING    ESTIMATE

-------
                                  FEDERAL AGENCY  POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                          DEPARTMENT OF  NAVY                      DEPARTMENT OF NAVY
                 PROJECT IDENTIFICATION
                                    REQ    EST   PROJECT
                 BUDGET     COMPL   COMPL  COMPL ASSESS- MEDIA
               (THOUSANDS)  STATUS  DATE   DATE  MENT    TYPE
                                                                                                                      NAVY-17
                            ADEQUACY OF PROJECT
                          ENGIN-
                          EERING    TIME      COST
 CT-170022188 PROJECT:  S169B
 UST REMOVAL
 ACCT:  O&M
 NUSC NEW LONDON LABORATORY
 NEW LONDON                       CT

 CT-170022188 PROJECT:  S169D
 UST ASSESSMENT
 ACCT:  OSM
 NUSC NEW LONDON LABORATORY
 NEW LONDON                       CT

 DC-170000019 PROJECT:  S268B
 LEAD TECHNOLOGY ACTIVITY FOR NAVAIR HAZMIN
 ACCT:  DERA
 COMNAVAIRSYSCOM WASHINGTON DC
 WASHINGTON DC                    DC
FL-170022474 PROJECT: C064D
RD/RA
ACCT: DERA
NAS CECIL FIELD FL
CECIL FIELD
FL-170022474 PROJECT: C064E
IR SALARY/SUPPORT REQUIREMENTS
ACCT: DERA
NAS CECIL FIELD FL
CECIL FIELD

FL-170022474 PROJECT: T003A
PCB TRANSFORMER EVALUATION
ACCT: O&M
NAS CECIL FIELD FL
CECIL FIELD
                                 FL
FL
FL
            K7
                      25.0  ESDF   87/07  90/09 MEDIUM   SOLID      NOT       NOT
                                                         WASTE     AVAIL     AVAIL
                      27.0  ESDF   90/05  90/09 MEDIUM   SOLID      NOT       NOT
                                                         WASTE     AVAIL     AVAIL
                     250.0  ESDF
                   1,960.0  ESDF
                      84.0  ESDF
                      25.0  ESDF
                                          90/09  HIGH     SOLID      NOT       NOT
                                                         WASTE     AVAIL     AVAIL
                                               NOT
                                              AVAIL
                                               NOT
                                              AVAIL
                                               NOT
                                              AVAIL
                                          91/09  HIGH     CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
                                                                  DESIGN    TIMING    ESTIMATE
                                          90/09  HIGH     CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
                                                                  DESIGN    TIMING    ESTIMATE
90/09  HIGH    TOXIC    ADEQUATE  ADEQUATE    ADEQUATE
             SUBSTANCE   DESIGN    TIMING     ESTIMATE

-------
                                 FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                         DEPARTMENT OF NAVY                      DEPARTMENT OF NAVY
                PROJECT IDENTIFICATION
                     REQ    EST   PROJECT
  BUDGET     COMPL   COMPL  COMPL  ASSESS- MEDIA
(THOUSANDS)   STATUS  DATE    DATE   MENT    TYPE
                                                                                                                     NAVY-18
                            ADEQUACY OF  PROJECT
                          ENGIN-
                          EERING    TIME      COST
FL-170022952 PROJECT: C060C
RI/FS
ACCT: DERA
NAS KEY WEST FL
KEY WEST NAV AIR ST
                                 FL
FL-170022952 PROJECT: C060E
IR SALARY/SUPPORT REQUIREMENTS
ACCT: DERA
NAS KEY WEST FL
KEY WEST NAV AIR ST              FL

FL-170023244 PROJECT: D013A
INSTALLATION OF BACKFLOW PREVENTER
ACCT: 04M
NAS WHITING FLO MILTON FL
MILTON                           FL

FL-170023244 PROJECT: C063C
RI/FS
ACCT: DERA
NAS WHITING FLO MILTON FL
MILTON                           FL

FL-170023244 PROJECT: W166V
FIRE FIGHTING TRAINING AREA (OLF BARIN)
ACCT: OtM
NAS WHITING FLD MILTON FL
MILTON                           FL

FL-170023788 PROJECT: C062D
RD/RA
ACCT: DERA
NAVSTA MAYPORT FL
MAYPORT                          FL
      200.0  ESDF
       50.0  ESDF
                           90/09  HIGH    CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
90/09  HIGH    CERCLA   ADEQUATE   ADEQUATE   ADEQUATE
                         DESIGN    TIMING    ESTIMATE
       88.0  ESDF   93/02   92/06 MEDIUM  DRINKING  ADEQUATE  ADEQUATE   ADEQUATE
                                         WATER     DESIGN    TIMING    ESTIMATE
      200.0   ESDF
      180.0  ESDP
      720.0  ESDF
90/09  HIGH    CERCLA   ADEQUATE   ADEQUATE   ADEQUATE
                         DESIGN    TIMING    ESTIMATE
90/12  HIGH    WATER    ADEQUATE  ADEQUATE   ADEQUATE
                         DESIGN    TIMING    ESTIMATE
                           91/12  HIGH    CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE

-------
                                  FEDERAL AGENCY  POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                          DEPARTMENT OF  NAVY                      DEPARTMENT OF NAVY
                 PROJECT IDENTIFICATION
                                    REQ    EST   PROJECT
                 BUDGET     COMPL   COMPL  COMPL ASSESS- MEDIA
                (THOUSANDS)  STATUS  DATE   DATE  MENT    TYPE
                                                                                     NAVY-19
                            ADEQUACY OF PROJECT
                          ENGIN-
                          EERING    TIME      COST
 FL-170023788 PROJECT:  C062E
 IR SALARY/SUPPORT REQUIREMENTS
 ACCT: DERA
 NAVSTA MAYPORT FL
 MAYPORT                          FL

 FL-170024412 PROJECT:  C004H
 UST REMEDIAL ACTION
 ACCT: DERA
 NAS JACKSONVILLE  FL
 JACKSONVILLE                     FL

 FL-170024412 PROJECT:  C004I
 IR SALARY/SUPPORT REQUIREMENTS
 ACCT:  DERA
 NAS JACKSONVILLE  FL
 JACKSONVILLE                     FL
FL-170024412 PROJECT: T007B
PCS TRANSFORMER REPLACEMENT
ACCT: O&M
NAS JACKSONVILLE FL
JACKSONVILLE
FL-170024412 PROJECT: T007A
PCB TRANSFORMER EVALUATION
ACCT: O&M
NAS JACKSONVILLE FL
JACKSONVILLE

FL-170024610 PROJECT: C025B
RI/FS
ACCT: DERA
NAS PENSACOLA FL
PENSACOLA
FL
FL
FL
                      50.0  ESDF
                      75.0  ESDF
                      8S.O  ESDF
                                          90/09 MEDIUM   CERCU     NOT       NOT         NOT
                                                                   AVAIL     AVAIL      AVAIL
                                          90/09  HIGH    CERCLA   ADEQUATE   ADEQUATE   ADEQUATE
                                                                   DESIGN    TIMING    ESTIMATE
                                          90/09  HIGH    CERCLA   ADEQUATE   ADEQUATE   ADEQUATE
                                                                   DESIGN    TIMING    ESTIMATE
                     992.0  ESDP   91/10  91/04  HIGH    TOXIC    ADEQUATE   ADEQUATE   ADEQUATE
                                                       SUBSTANCE   DESIGN    TIMING    ESTIMATE
            K7
                      25.0  ESDF
                   1.000.0  ESDF
90/09  HIGH    TOXIC    ADEQUATE  ADEQUATE    ADEQUATE
             SUBSTANCE   DESIGN    TIMING    ESTIMATE
90/09  HIGH    CERCLA   ADEQUATE   OVERDUE     ADEQUATE
                         DESIGN    TIMING     ESTIMATE

-------
                                 FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                         DEPARTMENT OF NAVY                      DEPARTMENT OF NAVY
                PROJECT IDENTIFICATION
                     REQ    EST   PROJECT
  BUDGET     COMPL   COMPL  COMPL ASSESS-  MEDIA
(THOUSANDS)  STATUS  DATE   DATE  MENT    TYPE
                                                                     NAVY-20
                            ADEQUACY OF PROJECT
                          ENGIN-
                          EERING    TIME      COST
FL-170024610 PROJECT: C025C
RD/RA
ACCT: DERA
NAS PENSACOLA FL
PENSACOLA                        FL

FL-170024736 PROJECT: C067D
RD/RA
ACCT: DERA
NTC ORLANDO FL
ORLANDO                          FL

FL-170065886 PROJECT: W422C
CONSTRUCT INDUSTRIAL WASTE TREATMENT FACILITY
ACCT: MILCON
NAVAIREWORKFAC NAS JACKSNVL FL
JACKSONVILLE                     FL

FL-170065886 PROJECT: W422D
ALTER METAL TREATMENT FACILITY BLDB 794
ACCT: MILCON
NAVAIREWORKFAC NAS JACKSNVL FL
JACKSONVILLE                     FL

FL-170065886 PROJECT: W422B
ALTER PAINT HANGAR, BLDG 868
ACCT: MILCON
NAVAIREWORKFAC NAS JACKSNVL FL
JACKSONVILLE                     FL

GA-170024174 PROJECT: W222F
CORRECT SPCC DEFICIENCIES
ACCT: OtM
NAS ATLANTA GA
MARIETTA                         GA
    3,150.0  ESDF
      100.0   ESDF
    3,360.0   ESDP
    5,750.0   ESDP
      228.0   ESDP
       55.0   ESDP
94/12  HIGH    CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
                         DESIGN    TIMING    ESTIMATE
                           92/09  HIGH    CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
90/10  HIGH    WATER    ADEQUATE  ADEQUATE   ADEQUATE
                         DESIGN    TIMING   ESTIMATE
90/10  HIGH    WATER    ADEQUATE  ADEQUATE   ADEQUATE
                         DESIGN    TIMING    ESTIMATE
91/10  HIGH    WATER    ADEQUATE   ADEQUATE   ADEQUATE
                         DESIGN    TIMING    ESTIMATE
                          90/09  HIGH    WATER    ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE

-------
                                  FEDERAL  AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                          DEPARTMENT OF  NAVY                      DEPARTMENT OF NAVY
                 PROJECT IDENTIFICATION
                    REQ    EST   PROJECT
  BUDGET     COMPL   COMPL  COMPL ASSESS- MEDIA
(THOUSANDS)   STATUS  DATE   DATE  MENT    TYPE
                                                                                                                     NAVY-21
                            ADEQUACY OF  PROJECT
                          ENGIN-
                          EERING    TIME      COST
 HI-170022271  PROJECT:  C012C
 RD/RA
 ACCT: DERA
 NAVMAG LUALUALEI  HI
 LUALUALEI                        HI

 HI-170024326  PROJECT:  C011C
 RD/RA
 ACCT:  DERA
 MAS  BARBERS POINT HI
 BARBERS  POINT                   HI

 HI-170024334  PROJECT:  C014E
 RD/RA
 ACCT:  DERA
 PWC  PEARL  HARBOR  HI
 PEARL  HARBOR                     HI

 HI-170024334  PROJECT:  S005P
 RCRA  FACILITY INVESTIGATION
 ACCT:  DERA
 PWC  PEARL HARBOR  HI
 PEARL  HARBOR                     HI

 HI-170024334 PROJECT:  W425J
 EMERGENCY GENERATOR, SEWAGE LIFT STA. BLDG. 322
 ACCT:  O&M
 PWC PEARL HARBOR HI
 PEARL HARBOR                     HI

HI-170024339 PROJECT:  S090F
MODIFICATION OF HAZ WASTE STORAGE TANKS
ACCT: O&M
NSY PEARL HARBOR HI
PEARL HARBOR                     HI
       60.0   ESDF
       72.0   ESDF
     407.0  ESDF
    1.200.0  ESDP
92/05  HIGH    CERCLA   ADEQUATE  ADEQUATE    ADEQUATE
                         DESIGN    TIMING    ESTIMATE
91/12  HIGH    CERCLA   ADEQUATE  ADEQUATE    ADEQUATE
                         DESIGN    TIMING    ESTIMATE
                          91/12  HIGH    CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
                          90/09  HIGH    SOLID    ADEQUATE  ADEQUATE   ADEQUATE
                                         WASTE     DESIGN    TIMING    ESTIMATE
      102.0  ESDF   79/03  90/09  HIGH    WATER
     331.0  ESDF
90/09 MEDIUM   SOLID
               WASTE
                                                  ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
                                                  ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE

-------
                                  FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                         DEPARTMENT OF NAVY                      DEPARTMENT OF NAVY
                PROJECT IDENTIFICATION
                     REQ    EST   PROJECT
  BUDGET     COMPL   COMPL  COMPL ASSESS- MEDIA
(THOUSANDS)   STATUS  DATE   DATE   MENT     TYPE
                                                                     NAVY-22
  ADEQUACY OF PROJECT
ENGIN-
EERING    TIME      COST
HI-170024342 PROJECT: C139A                           100.0  ESDF
RI/FS
ACCT: DERA
NSC PEARL HARBOR HI
PEARL HARBOR                     HI

HI-170024342 PROJECT: C139D                           167.0  ESDF
RD/RA
ACCT: DERA
NSC PEARL HARBOR HI
PEARL HARBOR                     HI

HI-170024342 PROJECT: W058S
OIL SPILL PREVENTION
ACCT: MILCON
NSC PEARL HARBOR HI
PEARL HARBOR                     HI

HI-170024712 PROJECT: S048C                           750.0  ESDP
HI HW MINIMIZATION DEMONSTRATION PROJECT     OA
ACCT: DERA
PACNAVFACENGCOM PEARL HBR HI
PEARL HARBOR                     HI

HI-170024719 PROJECT: W054B                            10.0  ESDP
CORRECT SPCC DEFICIENCIES
ACCT: O&M
PACMISRANFAC HAWAIIAN AREA
KEKAHA                           HI

IL-170022930 PROJECT: S250B                            43.0  ESDP
CONSTRUCT HAZARDOUS WASTE ACCUMULATION PADS
ACCT: O&M
NAS GLENVIEW IL
GLENVIEW                         IL
                           90/09  HIGH    CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
                           91/12  HIGH    CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
    5,200.0   ESRO   78/12   90/09  HIGH    WATER    ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
                           90/09  HIGH    SOLID    ADEQUATE  ADEQUATE   ADEQUATE
                                         WASTE     DESIGN    TIMING    ESTIMATE
                           91/06  HIGH    WATER    ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
                          90/11 MEDIUM   SOLID    ADEQUATE  ADEQUATE   ADEQUATE
                                         WASTE     DESIGN    TIMING    ESTIMATE

-------
                                  FEDERAL  AGENCY  POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                          DEPARTMENT  OF  NAVY                      DEPARTMENT OF NAVY
                 PROJECT IDENTIFICATION
                                    REQ    EST   PROJECT
                 BUDGET     COMPL   COMPL  COMPL ASSESS- MEDIA
               (THOUSANDS)  STATUS  DATE   DATE  MENT    TYPE
                                                                                    NAVY-23
                            ADEQUACY  OF  PROJECT
                          ENGIN-
                          EERING   TIME      COST
 IL-170066535 PROJECT:  S246A
 UST REMOVAL
 ACCT:  O&M
 COMNAVBASE GREATLAKES  IL
 GREAT  LAKES
                     100.0  ESDF   87/07  90/09  HIGH    SOLID     ADEQUATE  ADEQUATE   ADEQUATE
                                                         WASTE      DESIGN    TIMING    ESTIMATE
 LA-170022604  PROJECT: C090C
 RD/RA
 ACCT: 04M
 NAVSUPPACT NEW ORLEANS LA
 NEW ORLEANS

 LA-170022789  PROJECT: C119D
 RD/RA
 ACCT: DERA
 HAS NEW ORLEANS LA
 BELLE CHASSE
                                 IL
 IN-170023500 PROJECT:  C015F
 IR  SALARY/SUPPORT REQUIREMENTS
 ACCT:  DERA
 NAVWPNSUPPCEN CRANE  IN
 CRANE                            IN
 IN-170023500  PROJECT: C015B
 RI/FS
 ACCT: DERA
 NAVWPNSUPPCEN CRANE  IN
 CRANE
IN
LA
LA
LA-1700227eS PROJECT: S099C
UST REMEDIAL MEASURE/TANK TESTING
ACCT: DERA
NAS NEW ORLEANS LA
BELLE CHASSE                     LA
                                                      200.0  ESDF
                                                      500.0  ESDF
                                                      150.0  ESDF
                       5.0  ESDF
                                                       60.0  ESDF
                                          90/09  HIGH    CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
                                                                   DESIGN    TIMING    ESTIMATE
                                          90/09  HIGH    CERCU   ADEQUATE  ADEQUATE   ADEQUATE
                                                                   DESIGN    TIMING    ESTIMATE
                                          90/09  HIGH     CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
                                                                   DESIGN    TIMING    ESTIMATE
91/12  HIGH    CERCLA   ADEQUATE   ADEQUATE    ADEQUATE
                         DESISN    TIMING    ESTIMATE
                                          90/09  HIGH     SOLID     ADEQUATE  ADEQUATE   ADEQUATE
                                                         WASTE      DESIGN    TIMING    ESTIMATE

-------
                                 FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                         DEPARTMENT OF NAVY                      DEPARTMENT OF NAVY
                PROJECT IDENTIFICATION
                                    REQ    EST   PROJECT
                 BUDGET     COMPL   COMPL  COMPL ASSESS- MEDIA
               (THOUSANDS)  STATUS  DATE   DATE  MENT    TYPE
                                                                                     NAVY-24
                            ADEQUACY OF PROJECT
                          ENGIN-
                          EERING    TIME      COST
MA-170022022 PROJECT: C146C
RI/FS
ACCT: DERA
MAS SOUTH WEYMOUTH MA
WEYMOUTH
MA
MA-170022022 PROJECT: S274B
CONSTRUCT HAZARDOUS MATERIAL STORAGE FACILITY
ACCT: 0»M
NAS SOUTH WEYMOUTH MA
WEYMOUTH                         MA
MA-170023570 PROJECT: C099C
RD/RA
ACCT: DERA
NWIRP BEDFORD MA
BEDFORD
MD-170022562 PROJECT: C130B
RD/RA
ACCT: DERA
NTC BAINBRIDGE MD
BAINBRIDGE
MA
MD
MD-170023444 PROJECT: C070C
RD/RA
ACCT: DERA
NAVSURFWPNCENDET WHITE OAK LAB
WHITE OAK                        MD

MD-170023691 PROJECT: C027C
RD/RA (ABL MINERAL CO, WY)
ACCT: DERA
NIROP CUMBERLAND MD
CUMBERLAND                       MD
                     250.0  ESDF
                      51.0  ESDP
                      36.0  ESDF
                     445.0  ESDF
                   1,023.0  ESDF
                     166.0  ESDF
                                          91/12 MEDIUM   CERCLA
90/09  HIGH    SOLID
               WASTE
                                                                   UNDER    ADEQUATE   ADEQUATE
                                                                   DESIGN    TIMING    ESTIMATE
                                                                    NOT       NOT
                                                                   AVAIL     AVAIL
 NOT
AVAIL
91/12  HIGH    CERCLA    UNDER    ADEQUATE    ADEQUATE
                         DESIGN    TIMING    ESTIMATE
92/03 MEDIUM   CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
                         DESIGN    TIMING   ESTIMATE
91/04 MEDIUM   CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
                         DESIGN    TIMING   ESTIMATE
92/01 MEDIUM   CERCLA   ADEQUATE   ADEQUATE   ADEQUATE
                         DESIGN    TIMING    ESTIMATE

-------
                                  FEDERAL  AGENCY  POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                          DEPARTMENT  OF NAVY                      DEPARTMENT OF NAVY
                 PROJECT IDENTIFICATION
                                    REQ    EST   PROJECT
                 BUDGET     COMPL   COMPL  COMPL ASSESS- MEDIA
               (THOUSANDS)  STATUS  DATE   DATE  MENT    TYPE
                                                                                     NAVY-25
                            ADEQUACY  OF  PROJECT
                          ENGIN-
                          EERING    TIME     COST
 MO-170024109 PROJECT:  C030F
 RD/RA
 ACCT: DERA
 NAVORDSTA INDIAN HEAD  MD
 INDIAN HEAD                     MD

 MD-170024536 PROJECT:  C049E
 RD/RA
 ACCT: DERA
 NAS PATUXENT RIVER  MD
 PATUXENT  RIVER                   MD

 MO-170024536 PROJECT:  S060L
 HAZARDOUS WASTE  TRANSFER FACILITY
 ACCT:  O&M
 NAS PATUXENT RIVER  f!D
 PATUXENT  RIVER                   MD
MD-170024687  PROJECT: C194C
RD/RA
ACCT: DERA
NAVMEDCOM NATCAPREG BETHESDA
BETHESDA
MD-170062226 PROJECT: C213C
RD/RA
ACCT: DERA
NAVSTA ANNAPOLIS MD
ANNAPOLIS

MD-170062226 PROJECT: W362F
BILGE WATER OIL SEPARATOR
ACCT: O&M
NAVSTA ANNAPOLIS MD
ANNAPOLIS
MD
MD
MD
                                                       16.0  ESDF
                   2,918.0  ESDF
                                          90/09 MEDIUM   CERCLA   ADEQUATE   ADEQUATE    ADEQUATE
                                                                   DESIGN    TIMING     ESTIMATE
91/03 MEDIUM   CERCLA   ADEQUATE   ADEQUATE   ADEQUATE
                         DESIGN    TIMING    ESTIMATE
                     195.0  ESDP   91/06  90/09  HIGH    SOLID    ADEQUATE  ADEQUATE    ADEQUATE
                                                         WASTE     DESIGN    TIMING    ESTIMATE
                                                       60.0  ESDF
                                                       94.0  ESDF
                      36.0  ESRO
                                          90/09 MEDIUM   CERCLA     NOT       NOT        NOT
                                                                   AVAIL     AVAIL      AVAIL
                                          90/12 MEDIUM   CERCLA     NOT       NOT        NOT
                                                                   AVAIL     AVAIL      AVAIL
                                          90/09  HIGH    WATER    ADEQUATE  ADEQUATE    ADEQUATE
                                                                   DESIGN    TIMING    ESTIMATE

-------
                                 FEDERAL A6ENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                         DEPARTMENT OF NAVY                      DEPARTMENT OF NAVY
                PROJECT IDENTIFICATION
                     REG)    EST   PROJECT
  BUDGET     COMPL   COMPL  COMPL ASSESS-  MEDIA
(THOUSANDS)   STATUS  DATE   DATE  MENT     TYPE
                                                                                                                      NAVY-Z6
                            ADEQUACY OF PROJECT
                          ENGIN-
                          EERING    TIME      COST
ME-170022018 PROJECT: A062E
MODELINS ANALYSIS OF SUMMER HEATINB PLANT
ACCTi OtM
NAS BRUNSWICK ME
BRUNSWICK                        ME

ME-170022018 PROJECT: C038D
RD/RA
ACCT: DERA
NAS BRUNSWICK ME
BRUNSWICK                        ME

ME-170022018 PROJECT: W066R
VERIFICATION OF POSSIBLE SROUNDWATER CONTAM.
ACCT: OftM
NAS BRUNSWICK ME
BRUNSWICK                        ME
ME-170022018 PROJECT: W397D
CONSTRUCT SALT/SAND STORAGE
ACCT: 0»M
NAS BRUNSWICK ME
BRUNSWICK
ME-170024355 PROJECT: C203B
RI/FS
ACCT: DERA
NAVCOMHU CUTLER ME
CUTLER
                                 ME
                                 ME
ME-170024355 PROJECT: S208A
HAZARDOUS WASTE TRANSFER FACILITY
ACCT: 08M
NAVCOMMU CUTLER ME
CUTLER                           ME
       30.0  ESDP
    2,800.0  ESDF
       10.0  ESDP
       76.0  ESDP
                                                      100.0  ESDF
                           90/09  HIGH      AIR     ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
91/09  HIGH    CERCLA   ADEQUATE  ADEQUATE    ADEQUATE
                         DESIGN    TIMING     ESTIMATE
90/09  HIGH    WATER
                           91/03   HIGH    WATER
                                                    NOT       NOT        NOT
                                                   AVAIL     AVAIL      AVAIL
                                                    NOT       NOT        NOT
                                                   AVAIL     AVAIL      AVAIL
                           90/09  HIGH    CERCLA    UNDER    ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
       36.0  ESDP   80/11   91/10 MEDIUM   SOLID    ADEQUATE  ADEQUATE   ADEQUATE
                                         WASTE     DESIGN    TIMING    ESTIMATE

-------
                                  FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                          DEPARTMENT OF NAVY                      DEPARTMENT OF NAVY
                 PROJECT IDENTIFICATION
                                    REQ    EST   PROJECT
                 BUDGET     COMPL   COMPL  COMPL ASSESS- MEDIA
               (THOUSANDS)  STATUS  DATE   DATE  MENT    TYPE
                                                                                     NAVY-27
                            ADEQUACY OF  PROJECT
                          ENGIN-
                          EERING    TIME      COST
 MN-170022914 PROJECT:  C033D
 RD/RA
 ACCT: DERA
 NIROP MINNEAPOLIS  MN
 FRIDLEY
NC-170022580 PROJECT: S143C
UST REMEDIAL INVESTIGATION
ACCT: DERA
MCB CAMP LEJEUNE NC
CAMP LEJEUNE

NC-170027261 PROJECT: C019B
RI/FS
ACCT: DERA
MCAS CHERRY POINT NC
CHERRY POINT

NC-170027261 PROJECT: C019D
RD/RA
ACCT: DERA
MCAS CHERRY POINT NC
CHERRY POINT
MN
 MN-170068679  PROJECT: C223A
 IR  SALARY/SUPPORT REQUIREMENTS
 ACCT:  DERA
 NAVPRO MINNEAPOLIS MN
 MINNEAPOLIS                      MN
NC-1700225SO PROJECT: C058A
RI/FS
ACCT: DERA
MCB CAMP  LEJEUNE NC
CAMP LEJEUNE
NC
NC
NC
NC
                                                       50.0  ESDF
                                                      100.0  ESDF
                                                      800.0  ESDF
                      79.0  ESDP
                     150.0  ESDF
                   2,500.0  ESDF
                                          90/09  HIGH    CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
                                                                   DESIGN    TIMING    ESTIMATE
                                          90/09  HIGH    CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
                                                                   DESIGN    TIMING    ESTIMATE
                                          90/09  HIGH    CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
                                                                   DESIGN    TIMING    ESTIMATE
90/09  HIGH    SOLID    ADEQUATE  ADEQUATE   ADEQUATE
               WASTE     DESIGN    TIMING    ESTIMATE
90/09  HISH    CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
                         DESIGN    TIMING    ESTIMATE
91/01  HIGH    CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
                         DESIGN    TIMING    ESTIMATE

-------
                                 FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                         DEPARTMENT OF NAVY                      DEPARTMENT OF NAVY
                PROJECT IDENTIFICATION
                     REQ    EST   PROJECT
  BUDGET     COMPL   COMPL  COMPL ASSESS- MEDIA
(THOUSANDS)  STATUS  DATE   DATE  MENT    TYPE
                                                                                                                      NAVY-28
  ADEQUACY OF PROJECT
ENGIN-
EERING    TIME      COST
NE-170023026 PROJECT: C180B
RI/FS
ACCT: DERA
NAVRESCEN LINCOLN NE
LINCOLN                          NE

NH-170022019 PROJECT: W178N
CORRECT SPCC DEFICIENCIES
ACCT: O&M
NSY PORTSMOUTH NH
PORTSMOUTH                       NH

NJ-170022172 PROJECT: C029D
RD/RA
ACCT: DERA
WPNSTA EARLE COLTS NECK NJ
COLTS NECK                       NJ

NJ-170022695 PROJECT: C103B
RI/FS
ACCT: DERA
NAVAIRPROPCEN TRENTON NJ
TRENTON                          NJ

NJ-170022695 PROJECT: S171C
DISSOLVED AIR FLOTATION/FILTER PRESS FACILITY
ACCT: MILCON
NAVAIRPROPCEN TRENTON NJ
TRENTON                          NJ

NJ-170022695 PROJECT: W088G
UPGRADE BOILER SLOWDOWN SEWER CONNECTION
ACCT: O&M
NAVAIRPROPCEN TRENTON NJ
TRENTON                          NJ
      100.0  ESDF
      225.0  ESDP
                           90/09 MEDIUM   CERCLA   ADEQUATE   ADEQUATE   ADEQUATE
                                                    DESIGN    TIMING    ESTIMATE
                           90/09  HIGH     WATER
                                                     NOT       NOT
                                                    AVAIL     AVAIL
      500.0  PSDF
       20.0  PSDF
        6.0   PSDF
                     NOT
                    AVAIL
    1,950.0  PSDF   93/01   90/12  HIGH     CERCLA    ADEQUATE  ADEQUATE   ADEQUATE
                                                    DESIGN    TIMING    ESTIMATE
                           90/09  HIGH     CERCLA    ADEQUATE  ADEQUATE   ADEQUATE
                                                    DESIGN    TIMING    ESTIMATE
                           91/03 MEDIUM   SOLID     ADEQUATE  ADEQUATE   ADEQUATE
                                          WASTE     DESIGN    TIMING    ESTIMATE
                           90/09  MEDIUM    WATER    ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE

-------
                                  FEDERAL AGENCY  POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                          DEPARTMENT OF  NAVY                      DEPARTMENT OF NAVY
                 PROJECT IDENTIFICATION
                                    REQ    EST   PROJECT
                 BUDGET     COMPL   COMPL  COMPL ASSESS- MEDIA
               (THOUSANDS)  STATUS  DATE   DATE  MENT    TYPE
                                                                                    NAVY-29
                            ADEQUACY  OF  PROJECT
                          ENGIN-
                          EERING    TIME      COST
 NJ-170027274 PROJECT:  C059H
 IR SALARY/SUPPORT REQUIREMENTS
 ACCT:  DERA
 NAVAIRENGCEN LAKEHURST NJ
 LAKEHURST                       NJ

 NJ-170027274 PROJECT:  S031G
 CORRECT SPCC DEFICIENCIES  (B580)
 ACCT:  O&M
 NAVAIRENSCEN LAKEHURST NJ
 LAKEHURST                       NJ

 NJ-170027274 PROJECT:  W378S
 CORRECT SPCC DEFICIENCIES  (VARLOCS)
 ACCT:  OSM
 NAVAIRENGCEN LAKEHURST NJ
 LAKEHURST                       NJ
NV-170022173 PROJECT: C102B
RI/FS
ACCT: DERA
NAS FALLON NV
FALLON
PA-170022104 PROJECT: C085B
RI/FS
ACCT: DERA
SPCC MECHANICSBURG PA
MECHANICSBURG

PA-170022312 PROJECT: C115B
RI/FS
ACCT: DERA
NAS WILLOW GROVE PA
HORSHAM
NV
PA
PA
                     100.0  OTHR
                     118.0  PSDF
                     140.0  ESDF
                     100.0  ESDF
                     500.0  ESDF
                     150.0  ESDF
90/09 MEDIUM   CERCLA   ADEQUATE   ADEQUATE   ADEQUATE
                         DESIGN    TIMING   ESTIMATE
                                          91/03  HIGH    SOLID    ADEQUATE   ADEQUATE   ADEQUATE
                                                         WASTE     DESIGN    TIMING    ESTIMATE
                                          91/04 MEDIUM   WATER       NOT        NOT
                                                                   AVAIL    AVAIL
                                              NOT
                                              AVAIL
                                          90/09 MEDIUM   CERCLA   ADEQUATE   ADEQUATE   ADEQUATE
                                                                   DESIGN    TIMING    ESTIMATE
                                          90/09 MEDIUM   CERCLA    ADEQUATE  ADEQUATE   ADEQUATE
                                                                   DESIGN     TIMING    ESTIMATE
                                          90/09  HIGH     CERCLA    ADEQUATE   ADEQUATE    ADEQUATE
                                                                   DESIGN     TIMING     ESTIMATE

-------
                                  FEDERAL  AGENCY  POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                          DEPARTMENT  OF  NAVY                      DEPARTMENT OF NAVY
                 PROJECT  IDENTIFICATION
                     REQ    EST   PROJECT
  BUDGET     COMPL   COMPL  COMPL ASSESS-  MEDIA
(THOUSANDS)   STATUS  DATE   DATE   MENT     TYPE
                                                                     NAVY-30
  ADEQUACY OF PROJECT
ENGIN-
EERING    TIME      COST
 PA-170022312  PROJECT: C115C
 RD/RA
 ACCT: DERA
 NAS WILLOW GROVE PA
 HORSHAM                          PA

 PA-170022418  PROJECT: W106S
 CORRECT  SPCC  DEFICIENCIES
 ACCT: OSM
 NSY PHILADELPHIA PA
 PHILADELPHIA                     PA

 PA-170022418  PROJECT: W106V
 PICKLING TANK FACILITY
 ACCT: OSM
 NSY PHILADELPHIA PA
 PHILADELPHIA                     PA

 PA-170022418  PROJECT: W106X
 CORRECT SPCC DEFICIENCIES
 ACCT: O&M
 NSY PHILADELPHIA PA
 PHILADELPHIA                     PA

 PA-170022418 PROJECT: W106T
SPILL RESPONSE EQUIPMENT STORAGE BUILDING
ACCT:  O&M
NSY PHILADELPHIA PA
PHILADELPHIA                     PA

PA-170024545 PROJECT: C032E
RD/RA
ACCT:  DERA
NAVAIRDEVCEN WARMINSTER PA
WARMINSTER                       PA
      420.0  ESDF
       50.0   ESRO
       60.0   ESDP
       24.0   ESDP
      150.0   ESRO
    2,500.0   ESDF
                           92/01  MEDIUM    CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
                           90/09  MEDIUM    SOLID    ADEQUATE  ADEQUATE   ADEQUATE
                                          WASTE     DESIGN    TIMING    ESTIMATE
                           90/09  HIGH    WATER    ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
                           91/03  HIGH    WATER    ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
                          90/09 MEDIUM   WATER    ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
                          90/12 MEDIUM   CERCLA     NOT
                                                   AVAIL
          NOT
         AVAIL
 NOT
AVAIL

-------
                                  FEDERAL AGENCY  POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                          DEPARTMENT OF  NAVY                      DEPARTMENT OF NAVY
                 PROJECT IDENTIFICATION
                                    REQ    EST   PROJECT
                 BUDGET     COMPL   COMPL  COMPL ASSESS- MEDIA
               (THOUSANDS)  STATUS  DATE   DATE  MENT    TYPE
                                                                                    NAVY-31
                            ADEQUACY OF  PROJECT
                          ENGIN-
                          EERING    TIME      COST
 RI-170022036 PROJECT:  S030G
 RISK ASSESSMENT AT CBC DAVISVILLE
 ACCT:  DERA
 CBC DAVISVILLE  RI
 NORTH  KINGSTOWN                 RI
 RI-170024790  PROJECT:  C142E
 RD/RA NUSC  EAST  LYME CT
 ACCT:  DERA
 NUSC  NEWPORT  RI
 MIDDLETOWN
            NO
SC-170022560  PROJECT: C017E
RD/RA
ACCT: DERA
NSY CHARLESTON SC
NORTH CHARLESTON
                                 RI
                                 SC
SC-170022620 PROJECT: S056J
CLOSURE OF DEMILITARIZATION FURNACE
ACCT: 04M
WPNSTA CHARLESTON SC
CHARLESTON                       SC
SC-1700Z3209 PROJECT: C107C
RD/RA
ACCT: DERA
MCAS BEAUFORT SC
BEAUFORT
SC-170027515 PROJECT: C017E
RD/RA
ACCT: DERA
COMNAVBASE CHARLESTON
SC
                                 SC
                     235.0  ESDP
                     350.0  ESDF
                     115.0  ESOF
                                                      125.0  ESDP
                     310.0  ESDF
                                                      115.0  ESDF
90/09  HIGH    SOLID     UNDER    ADEQUATE   ADEQUATE
               WASTE     DESIGN    TIMING    ESTIMATE
                                          90/12  HIGH    CERCLA    UNDER    ADEQUATE   ADEQUATE
                                                                   DESIGN    TIMING    ESTIMATE
                                          90/09  HIGH    CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
                                                                   DESIGN    TIMING    ESTIMATE
                                          90/09  HIGH    SOLID     ADEQUATE  ADEQUATE   ADEQUATE
                                                         WASTE      DESIGN    TIMING    ESTIMATE
95/01  HIGH    CERCLA   ADEQUATE   ADEQUATE   ADEQUATE
                         DESIGN    TIMING    ESTIMATE
                                          90/09  HIGH     CERCLA     NOT       NOT        NOT
                                                                  AVAIL     AVAIL      AVAIL

-------
                                 FEDERAL ASENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                         DEPARTMENT OF NAVY                      DEPARTMENT OF NAVY
                                                                                                                      NAVY-32
                PROJECT IDENTIFICATION
                        REQ    EST   PROJECT
     BUDGET     COMPL   COMPL  COMPL ASSESS- MEDIA
   (THOUSANDS)  STATUS  DATE   DATE  MENT    TYPE
                                               ADEQUACY OF PROJECT
                                             ENGIN-
                                             EERING    TIME      COST
TN-170022600 PROJECT: P019B
CONSTRUCT PEST CONTROL SHOP
ACCT: O&M
NAS MEMPHIS TN
MILLINGTON                       TN

TN-170022600 PROJECT: C046B
RI/FS
ACCT: DERA
NAS MEMPHIS TN
MILLINGTON                       TN

TX-170022786 PROJECT: C112C
RD/RA
ACCT: DERA
NAS DALLAS TX
DALLAS                           TX

TX-170024708 PROJECT: C010A
RD/RA
ACCT: DERA
NWIRP MCGREGOR TX
MCGREGOR                         TX

TX-170024738 PROJECT: C079C
RD/RA
ACCT: DERA
NAS CHASE FIELD TX
CHASE FIELD                      TX

TX-170024738 PROJECT: W122Q
ALT BEQ WASHRACK 2956 COLL/DRAINAGE
ACCT: O&M
NAS CHASE FIELD TX
CHASE FIELD                      TX
          78.0  ESDP
         100.0  ESDF
          15.0  ESDF
         106.0  ESDF
         318.0  ESDF
                              90/09  HIGH  PESTICIDES ADEQUATE  ADEQUATE   ADEQUATE
                                                       DESIGN    TIMING    ESTIMATE
                   90/09  HIGH    CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
                                            DESIGN    TIMING    ESTIMATE
                   90/09  HIGH    CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
                                            DESIGN    TIMING    ESTIMATE
                   90/09  HIGH    CERCLA   ADEQUATE  ADEQUATE    ADEQUATE
                                            DESIGN    TIMING     ESTIMATE
                   91/09  HIGH    CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
                                            DESIGN    TIMING    ESTIMATE
K7
9.0  ESDP   92/04  91/06 MEDIUM   WATER    ADEQUATE   ADEQUATE   ADEQUATE
                                            DESIGN    TIMING    ESTIMATE

-------
                                  FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                          DEPARTMENT  OF  NAVY                      DEPARTMENT OF NAVY
                 PROJECT IDENTIFICATION
                     REQ     EST    PROJECT
  BUDGET     COMPL   COMPL   COMPL  ASSESS- MEDIA
(THOUSANDS)   STATUS   DATE    DATE   MENT    TYPE
                                                                                                                      NAVY-33
                            ADEQUACY  OF  PROJECT
                          ENGIN-
                          EERING   TIME      COST
 TX-170024738 PROJECT:  H122R
 SPILL CONTROL-FIREFIGHTING CONTAINMENT FAC   K7
 ACCT: O&M
 NAS CHASE FIELD  TX
 CHASE FIELD                     TX

 TX-17002-+761 PROJECT:  C108D
 RD/RA
 ACCT: DERA
 NAS KINGSVILLE TX
 KINGSVILLE                      TX

 VA-170000066 PROJECT:  C225A
 IR  SALARY/SUPPORT  REQUIREMENTS
 ACCT:  DERA
 CINCLANT  NORFOLK VA
 NORFOLK                          VA

 VA-170022482  PROJECT:  C082B
 RI/FS
 ACCT:  DERA
 NAVFHIBASE  LITTLE  CREEK VA
 NORFOLK                          VA

 VA-170022482  PROJECT:  C082E
 IR  SALARY/SUPPORT  REQUIREMENTS
 ACCT:  DERA
 NAVPHIBASE  LITTLE  CREEK VA
 NORFOLK                          VA

VA-170022502  PROJECT:  C188B
RI/FS
ACCT: DERA
NAVHOSP PORTSMOUTH VA
PORTSMOUTH                       VA
      114.0   ESDP    91/0*   90/09  HIGH    WATER    ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
       45.0   ESDF
       50.0   ESDF
       50.0   ESDF
       57.0   ESDF
       30.0   ESDF
                           91/09  HIGH    CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
                           90/09   LOW     CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
90/09 MEDIUM   CERCLA   ADEQUATE   ADEQUATE    ADEQUATE
                         DESIGN    TIMING     ESTIMATE
90/09  LOW     CERCLA     NOT       NOT        NOT
                         AVAIL     AVAIL      AVAIL
                          90/09 MEDIUM   CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE

-------
                                 FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR  1991

                         DEPARTMENT OF NAVY                      DEPARTMENT OF NAVY
                PROJECT IDENTIFICATION
                                    REQ    EST   PROJECT
                 BUDGET     COMPL   COMPL  COMPL ASSESS- MEDIA
               (THOUSANDS)  STATUS  DATE   DATE  MENT    TYPE
                                                                                                                     NAVY-
                                                ADEQUACY OF PROJECT
                                              ENGIN-
                                              EERING    TIME      COST
VA-170022516 PROJECT: C048D
RD/RA
ACCT: DERA
NAVRADSTA DRIVER VA
DRIVER

VA-170024132 PROJECT: A287E
AIR PROGRAM SUPPORT
ACCT: O&M
NAVFACENGCOM ALEXANDRIA VA
VA
                                 VA
VA-170024132 PROJECT: A287H
HALON 1301 REDUCTION/ELIMINATION
ACCT: O&M
NAVFACENGCOM ALEXANDRIA VA
                                 VA
VA-170024132 PROJECT: C007L
RISK ASSESSMENT AT CBC DAVISVILLE
ACCT: DERA
NAVFACENGCOM ALEXANDRIA VA
                                 VA
VA-170024132 PROJECT: C007M
TOXICITY ASSESSMENT AT NAS WHIDBEY ISLAND
ACCT: DERA
NAVFACENGCOM ALEXANDRIA VA
                                 VA

VA-170024132 PROJECT: C007B
IR/UST QUALITY ASSURANCE/QUALITY CONTROL
ACCT: DERA
NAVFACENGCOM ALEXANDRIA VA
                                 VA
            NE
            NO
            NE
                     310.0  ESDF
                      40.0  ESDP
                      75.0  ESDF
                                          90/09 MEDIUM   CERCLA    ADEQUATE  ADEQUATE   ADEQUATE
                                                                  DESIGN    TIMING    ESTIMATE
                                          90/09 MEDIUM
                                          90/09 MEDIUM
                                                          AIR
                                                         AIR
                                            ADEQUATE  ADEQUATE   ADEQUATE
                                             DESIGN    TIMING    ESTIMATE
                                                                   NOT       NOT
                                                                  AVAIL     AVAIL
                                                      150.0  ESDP   91/09  90/09  HIGH
                     450.0  ESDP
                                          90/09   HIGH
                                                                   NOT
                                                                  AVAIL
150.0  ESDP   91/09   90/09  HIGH    CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
                                             DESIGN    TIMING    ESTIMATE
                                                        CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
                                                                  DESIGN    TIMING    ESTIMATE
                                   CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
                                             DESIGN    TIMING    ESTIMATE

-------
                                  FEDERAL  AGENCY  POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                          DEPARTMENT  OF  NAVY                      DEPARTMENT OF NAVY
                 PROJECT IDENTIFICATION
                        REQ    EST   PROJECT
     BUDGET     COMPL   COMPL  COMPL ASSESS- MEDIA
   (THOUSANDS)  STATUS  DATE   DATE  MENT    TYPE
                                                                         NAVY-35
                            ADEQUACY OF  PROJECT
                          ENGIN-
                          EERING    TIME      COST
 VA-170024132 PROJECT:  C007I
 BIOTECHNICAL SLOPE  PROTECTION  FOR RA SITES   NC
 ACCT:  DERA
 NAVFACENGCOM ALEXANDRIA VA
                                 VA

 VA-170024132 PROJECT:  C007C
 IR  SALARY/SUPPORT
 ACCT:  DERA
 NAVFACENGCOM ALEXANDRIA VA
                                 VA

 VA-170024132 PROJECT:  C0070
 QA/QC  FOR  PCB BIODEGRADATION AT PWC GUAM     NC
 ACCT:  DERA
 NAVFACENGCOM ALEXANDRIA VA
                                 VA

 VA-170024132  PROJECT:  S251B
 PURIFICATION/RECOVERY/REUSE METAL SOLUTIONS  NC
 ACCT:  DERA
 NAVFACENGCOM  ALEXANDRIA VA
                                 VA

 VA-170024132  PROJECT:  S251L
 ACTIVITY IR SALARY/SUPPORT
 ACCT: DERA
 NAVFACENGCOM ALEXANDRIA VA
                                 VA
VA-170024132 PROJECT: S038R
CYANIDE WASTESTREAMS MINIMIZATION
ACCT: DERA
NAVFACENGCOM ALEXANDRIA VA
NC
                                                      300.0  ESDP
       6,600.0  ESDF
          75.0  ESDF
         300.0  ESDP
          43.0  ESDP
                                                      225.0  ESDP
                              90/09  HIGH    CERCLA   ADEQUATE  ADEQUATE    ADEQUATE
                                                       DESIGN    TIMING     ESTIMATE
90/09  HIGH    CERCLA   ADEQUATE  ADEQUATE    ADEQUATE
                         DESIGN    TIMING    ESTIMATE
                              90/09  HIGH
                              90/09  HIGH
90/09  HIGH
                                                                           90/09  HISH
                                             CERCLA   ADEQUATE  ADEQUATE    ADEQUATE
                                                       DESIGN    TIMING    ESTIMATE
                                             SOLID    ADEQUATE  ADEQUATE    ADEQUATE
                                             WASTE     DESIGN    TIMING    ESTIMATE
                                             SOLID
                                             WASTE
               SOLID
               WASTE
                          NOT
                         AVAIL
            NOT
           AVAIL
 NOT
AVAIL
ADEQUATE  ADEQUATE   ADEQUATE
 DESIGN    TIMING    ESTIMATE
                                 VA

-------
                                 FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                         DEPARTMENT OF NAVY                      DEPARTMENT OF NAVY
                PROJECT IDENTIFICATION
                     REQ    EST   PROJECT
  BUDGET     COMPL   COMPL  COMPL  ASSESS- MEDIA
(THOUSANDS)   STATUS  DATE    DATE   MENT    TYPE
                                                                                                                      NAVY-38
                            ADEQUACY OF  PROJECT
                          ENGIN-
                          EERING    TIME      COST
VA-170024606 PROJECT: W135T
FIRE FIGHTING TRAINING RING
ACCT: 04M
NAS OCEANA VA
VIRGINIA BEACH                   VA

VA-170024685 PROJECT: C003D
RD/RA
ACCT: DERA
NAVSURUPNCEN DAHLGREN VA
DAHLGREN                         VA

VA-170024722 PROJECT: C051E
RD/RA
ACCT: DERA
MCDEC QUANTICO VA
QUANTICO                         VA

VA-170027302 PROJECT: W212C
OIL POLLUTION ABATEMENT (FMP)
ACCT: O&M
NAVSEASYSCOMHQ WASH DC
ARLINGTON                        VA

VA-170027302 PROJECT: W214A
ENG STUDIES/SUPPORT FOR ENVIROMENTAL PROTECTION
ACCT: 04M
NAVSEASYSCOMHQ WASH DC
ARLINGTON                        VA

VA-170027302 PROJECT: W256A
SHIP SOLID WASTE HANDLING EQUIPMENT (PROC)
ACCT: OPN
NAVSEASYSCOMHQ WASH DC
ARLINGTON                        VA
      150.0  ESDP
    1,555.0  ESDF
    2,399.0   ESDF
                           90/09  MEDIUM   WATER    ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
91/01 MEDIUM   CERCLA     NOT       NOT
                         AVAIL     AVAIL
    1,781.0   ESDP    95/07   90/09  HIGH    WATER
   10,067.0   ESDP    75/07   90/09  HIGH    WATER
                                                                         NOT
                                                                        AVAIL
90/10 MEDIUM   CERCLA   ADEQUATE   ADEQUATE   ADEQUATE
                         DESIGN    TIMING    ESTIMATE
      465.0   ESDP    95/07   90/09  HIGH    WATER    ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
                                                  ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
                                                  ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE

-------
                                  FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                          DEPARTMENT OF NAVY                      DEPARTMENT OF NAVY
                 PROJECT IDENTIFICATION
                                    REQ    EST   PROJECT
                 BUDGET     COMPL   COMPL  COMPL ASSESS- MEDIA
               (THOUSANDS)  STATUS  DATE   DATE  MENT    TYPE
                                                                                     NAVY-39
                            ADEQUACY OF  PROJECT
                          ENGIN-
                          EERING    TIME      COST
 VA-170027302 PROJECT:  W212B
 OIL POLLUTION ABATEMENT EQUIPMENT  (PROC)
 ACCT:  OPN
 NAVSEASYSCOMHQ WASH DC
 ARLINGTON                       VA

 VA-170027414 PROJECT:  C055C
 RD/RA
 ACCT:  DERA
 COMFOURTEEN PEARL HARBOR HI
 PEARL  HARBOR                    VA

 VA-170027414 PROJECT:  C055E
 IR  SALARY/SUPPORT REQUIREMENTS
 ACCT:  DERA
 COMFOURTEEN PEARL HARBOR HI
 PEARL  HARBOR                    VA

 VA-170027512 PROJECT:  W354J
 PETREATMENT STUDY (NPDES) BLDG. LP-20
 ACCT:  O&M
 NAVAIREWORKFAC NAS NORFOLK  VA
 NORFOLK                          VA
VA-170063194 PROJECT: C207B
RI/FS
ACCT: DERA
NFD-NSC CRANY ISLAND VA
PORTSMOUTH
                   7,579.0  ESDF   95/07  90/09  HIGH    WATER    ADEQUATE  ADEQUATE    ADEQUATE
                                                                   DESIGN    TIMING    ESTIMATE
WA-170000621 PROJECT: W152T
OIL SPILL PREVENTION
ACCT: O&M
NAVAIRVS WHIDBEY ISLAND WA
VA
                                 WA
                     305.0  ESDF
                     120.0  ESDF
                      95.0  ESDP
                                                      100.0  ESDF
                                                       22.0  ESDP
92/01 MEDIUM   CERCLA     NOT       NOT        NOT
                         AVAIL     AVAIL      AVAIL
90/09 MEDIUM   CERCLA     NOT       NOT         NOT
                         AVAIL     AVAIL      AVAIL
                                          90/09  HIGH    WATER    ADEQUATE  ADEQUATE    ADEQUATE
                                                                   DESIGN    TIMING    ESTIMATE
                                          90/09 MEDIUM   CERCLA   ADEQUATE  ADEQUATE    ADEQUATE
                                                                   DESIGN    TIMING    ESTIMATE
                                          90/09  HIGH    WATER    ADEQUATE   ADEQUATE   ADEQUATE
                                                                   DESIGN    TIMING   ESTIMATE

-------
                                  FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR  FISCAL YEAR  1991

                          DEPARTMENT OF NAVY                      DEPARTMENT OF  NAVY
                 PROJECT IDENTIFICATION
                                    REQ    EST   PROJECT
                 BUDGET     COMPL   COMPL  COMPL ASSESS- MEDIA
               (THOUSANDS)  STATUS  DATE   DATE  MENT    TYPE
                                                                                     NAVY-40
                            ADEQUACY OF PROJECT
                          ENGIN-
                          EERING    TIME      COST
 WA-170023361 PROJECT:  C072B
 RI/FS
 ACCT: DERA
 NAS WHIDBEY ISLAND HA
 MHIDBEY ISLAND NAS
MA
 WA-170023361 PROJECT:  S077G
 TOXICITY ASSESSMENT AT NAS WHIDBEY ISLAND     NO
 ACCT: DERA
 NAS MHIDBEY ISLAND HA
 MHIDBEY ISLAND NAS               MA

 HA-170023361 PROJECT:  H152S
 OIL SPILL CONTROL  - FIREFIGHTING  PAD
 ACCT: O&M
 NAS MHIDBEY ISLAND MA
 MHIDBEY ISLAND NAS               HA

 WA-170023419 PROJECT:  C052B
 RI/FS
 ACCT:  DERA
 NAVUSEAHARENGSTA KEYPORT HA
 KEYPORT                           HA

 HA-170023419 PROJECT:  C052D
 IR SALARY/SUPPORT  REQUIREMENTS
 ACCT: DERA
 NAVUSEAWARENGSTA KEYPORT HA
 KEYPORT                           HA

HA-170023419 PROJECT:  W400H
 SANITARY SEWER  CONNECTION,  BLDGS  5090-5095
ACCT: MILCON
NAVUSEAWARENGSTA KEYPORT WA
KEYPORT                           WA
                     500.0  ESDF
                     252'. 0  ESDP
                      57.0  ESDP
                   1.000.0  ESDF
                      60.0  ESDF
                     550.0   ESDP
                                          90/09  HIGH    CERCLA   ADEQUATE  ADEQUATE    ADEQUATE
                                                                   DESIGN    TIMING     ESTIMATE
                                          90/09  HIGH    SOLID     ADEQUATE  ADEQUATE   ADEQUATE
                                                         HASTE      DESIGN    TIMING    ESTIMATE
                                          91/12  HIGH    WATER     ADEQUATE  ADEQUATE   ADEQUATE
                                                                   DESIGN    TIMING    ESTIMATE
90/09  HIGH    CERCLA   ADEQUATE   ADEQUATE   ADEQUATE
                         DESIGN    TIMING    ESTIMATE
                                          90/09  HIGH    CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
                                                                  DESIGN    TIMING    ESTIMATE
                                          90/09  HIGH    WATER    ADEQUATE  ADEQUATE   ADEQUATE
                                                                  DESIGN    TIMING    ESTIMATE

-------
                                  FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                          DEPARTMENT OF NAVY                      DEPARTMENT OF NAVY
                 PROJECT IDENTIFICATION
                                    REQ    EST   PROJECT
                 BUDGET     COMPL   COMPL  COMPL ASSESS- MEDIA
               (THOUSANDS)  STATUS  DATE   DATE  MENT    TYPE
                                                                                     NAVY-41
                            ADEQUACY OF  PROJECT
                          ENGIN-
                          EERING    TIME      COST
 WA-170023426 PROJECT:  C209C
 RD/RA
 ACCT: DERA
 NSC PUGET SOUND  BREMERTON HA
 BREMERTON
WA-170027291 PROJECT: C016C
RD/RA
ACCT: DERA
SUBASE BANGOR HA
BANGOR

WA-170027291 PROJECT: T039B
PCB TRANSFORMER REPLACEMENT
ACCT: O&M
SUBASE BANGOR HA
BANGOR

WA-170027291 PROJECT: W400I
CORRECT SPCC DEFICIENCIES
ACCT: O&M
SUBASE BANGOR WA
BANGOR
WA
 WA-170023426  PROJECT:  C209D
 IR  SALARY/SUPPORT  REQUIREMENTS
 ACCT:  DERA
 NSC PUGET  SOUND  BREMERTON WA
 BREMERTON                        WA
WA-170027268  PROJECT: C206A
RD/RA
ACCT: DERA
NAVHOSP BREMERTON WA
BREMERTON
WA
WA
WA
WA
                     250.0  ESDF
                      38.0  ESDF
                                                       25.0  ESDF
                   6,835.0  ESDF
90/09  HIGH    CERCLA   ADEQUATE  ADEQUATE    ADEQUATE
                         DESIGN    TIMING    ESTIMATE
                                          90/09  HIGH    CERCLA   ADEQUATE  ADEQUATE    ADEQUATE
                                                                   DESIGN    TIMING    ESTIMATE
                                          90/09  HIGH    CERCLA   ADEQUATE  ADEQUATE    ADEQUATE
                                                                   DESIGN    TIMING    ESTIMATE
92/09  HIGH    CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
                         DESIGN    TIMING    ESTIMATE
                      75.0  ISDF   91/10  90/09 MEDIUM   TOXIC    ADEQUATE  ADEQUATE   ADEQUATE
                                                       SUBSTANCE   DESISN    TIMING    ESTIMATE
                      57.0  ESDP
90/09  HIGH    WATER    ADEQUATE  ADEQUATE   ADEQUATE
                         DESISN    TIMING    ESTIMATE

-------
                                 FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                         DEPARTMENT OF NAVY                      DEPARTMENT OF NAVY
                PROJECT IDENTIFICATION
                                    REQ    EST   PROJECT
                 BUDGET     COMPL   COMPL  COMPL ASSESS- MEDIA
               (THOUSANDS)  STATUS  DATE   DATE  MENT    TYPE
                                                                                                                     NAVY-42
                            ADEQUACY  OF  PROJECT
                          ENGIN-
                          EERING    TIME      COST
WA-170032013 PROJECT: H433B
OIL/WATER SEPARATOR
ACCT: 0*M
NUWES INDIAN IS DET
KEYPORT

*     TOTAL, DEPARTMENT OF NAVY
MA
                      20.0  ESDP
                            126,718.0
91/02  HIGH    HATER
                                                          199
ADEQUATE  ADEQUATE   ADEQUATE
 DESIGN    TIMING    ESTIMATE
      TOTAL, DEPARTMENT OF NAVY
                            126,718.0
                199

-------
ARMY

-------
DEPARTMENT OF
    ARMY

-------
                                                       ARMY-1
THE DEPARTMENT OF THE ARMY

The United States Department of the Army owns approximately 1,250
installations in the United States comprising about 10 million
acres.  They also own 131,288 buildings containing about 771
million square feet of floor space.  In addition to the property
in the geographic boundaries of the country the Army also owns
about 67 thousand acres of property in outlying areas of the U.S.

AGENCY POLLUTION ABATEMENT PLAN FOR FY 1991

The U. S. Army proposed 1,273 projects totalling over $582
million in their A-106 environmental plan for FY 1991.

Reflecting the relative number of facilities contained in the
different commands within the U. S. Army, the Army Materiel
Command contributed the largest number of projects to the
environmental plan with 512, totalling $342 million.  Forces
Command was next with 432 projects, totalling $93 million;
followed by the National Guard with 144 projects, totalling $6.3
million, and the Training and Doctrine Command with 137 projects,
totalling $131 million. Another 10 commands contributed a total
of 48 projects, totalling $10 million to the Army plan.

EPA evaluated the 1,273 projects according to the impact on the
local environment that would result if the projects were not
funded in FY 1991.  EPA rated 578 projects (budgeted at $386
million) as having "High" environmental impact.  "Medium" ratings
were assigned to 535 projects ($140 million)  and "Low" ratings to
160 projects ($57 million).

The distribution of projects across compliance classes for Army
indicates that there are 494 Class I projects, those in the plan
for current compliance reasons, or 39 percent of the total number
of projects in the FY 1991 plan.  The 507 Class II projects,
those in the plan to permit the agency to meet near-term future
compliance deadlines, make up 40 percent of the total;  and the
272 Class III projects, those in the plan for other environmental
reasons, make up 21 percent of the total.

The 1,273 projects proposed by the Army in their FY 1991 plan are
distributed across the various environmental media programs in
the following pattern:  529 RCRA projects, costing $158 million;
another 183 projects in the CERCLA area, costing $221 million;
plus 192 projects in the water and drinking water area, costing
$94 million; and 127 air projects, costing $30.4 million.  The
Army also proposed 123 projects in the areas of toxic substances,
pesticides, noise and radiation, costing $32 million; and another
119 multi-media projects, costing $47 million.

-------
                                                                     ARMY-2
                      TOTAL NUMBER OF POLLUTION ABATEMENT

                       PROJECTS PROPOSED FOR FY 1987 - 91

                                DEPT OF ARMY
            2000
   w

   o
   LU

   O
   tc
   a.,

   LL
   O

   oc
   LU
   m
   5
   D
1000-
                    FY87
                   FY88
FY89
FY90
FY91
                                        RSCAL YEARS
ARMY FIG 1

-------
                                                                            ARMY-3
                            TOTAL DOLLARS REQUESTED FOR POLLUTION

                              ABATEMENT PROJECTS FOR FY 1987 - 91

                                       DEPTOFARMY
            800000
            600000-
  o
  o
  o
  M-
  w
  DC
  O
  o
            400000-
            200000-
                       FY87
FY88
FY89
FY90
FY91
ARMY FIG 2
                                              FISCAL YEARS

-------
                                                                                              ARMY-4
      MAJOR
      COMMAND
TOTAL NUMBER AND DOLLARS PROPOSED FOR
POLLUTION ABATEMENT NEEDS FOR FY 1991
           DEPT OF ARMY
      NATIONAL GUARD
      HEALTH SERVICES
     RSRV FORCES CMD
        RSRVTRADOC
 MILITARY DIST OF WASH
     INFO SYSTEMS CMD
                                                                  6290
                                                                  6066
                              1 0
           100
1000         10000        100000      1000000
ARMY FIG 3A
(CONT'D ON ARMY FIG 3B)
                    PROJECTS

                    DOLLARS ($000)

-------
                                                                                             ARMY-5
MAJOR
COMMAND
   US MILITARY ACAD
      WESTERN CMD
   ARMY FORCES CMD
    ARMY MATL CMD
 TRAINING & DOC CMD
   MILIT TRAFFIC CMD
TOTAL NUMBER AND DOLLARS PROPOSED FOR
 POLLUTION ABATEMENT NEEDS FOR FY 1991
           DEPT OF ARMY
                                     100        1000       10000       100000     1000000     10000000
     ARMY FIG 3B
(CONT'D FROM ARMY FIG 3A)
                     PROJECTS

                     DOLLARS ($000)

-------
                         TOTAL NUMBER AND DOLLARS PROPOSED FOR
                           CLASS I, II, III PROJECTS FOR FY 1991
                                   DEPTOFARMY
                                                                                         HKHT-O
      CLASS I
     CLASS II
     CLASS III
           1 00
                              1 000
ARMY FIG 4
   10000

0  PROJECTS

•  DOLLARS ($000)
100000
1000000

-------
                                                                                ARMY-7
ARMY - TABLE 1: EPA EVALUATION OF THE ENVIRONMENTAL IMPACT OF PROPOSED
                POLLUTION ABATEMENT PROJECTS FOR FISCAL YEAR 1991
                INCLUDING NUMBER AND COST
                      DEPARTMENT OF ARMY
COMPLIANCE *
STATUS

CMPA
INOV
ESDP
ESDF
PSDF
ESRO
ESRE
ESDL
OTHR
GRAND TOTAL
HIGH
PROJECTS
COST
($1,000)
134
223,887.0
24
17,417.0
327
90,578.0
42
21,706.0
26
14,741.0
7
3,850.0
0
0.0
9
1,558.0
9
12,043.0
578
385,780.0
MEDIUM
PROJECTS
COST
($1,000)
1
75.0
0
0.0
5
6,917.0
350
74,970.0
72
19,056.0
26
9,369.0
8
583.0
37
10,888.0
36
17,719.0
535
139,577.0
LOW
PROJECTS
COST
($1,000)
0
0.0
0
0.0
3
280.0
14
4,246.0
3
960.0
23
2,921.0
13
517.0
53
7,987.0
51
40,145.0
160
57,056.0
TOTAL
PROJECTS
COST
($1,000)
135
223,962.0
24
17,417.0
335
97,775.0
406
100,922.0
101
34,757.0
56
16,140.0
21
1,100.0
99
20,433.0
96
69,907.0
1273
562,413.0
SEE SECTION III FOR  DEFINITIONS OF COMPLIANCE STATUS CATEGORIES

-------
       ARMY -  TABLE 2:  NUMBER AND DOLLAR AMOUNT OF POLLUTION ABATEMENT PROJECTS FOR FEDERAL INSTALLATIONS
                         PROPOSED BY MAJOR COMMAND/BUREAU FOR FISCAL YEAR 1991 BY CLASS/COMPLIANCE STATUS.*

                                         DEPARTMENT OF ARMY
                                                                                                                          ARMY-8
MAJOR COMMAND/
BUREAU CMPA
PROJECTS
COST
($1,000)
INFO SYS COM
DIST OF WASH
RSRV-TRADOC
RSRV-FORSCOM
HEALTH SERV
NATL GUARD
MIL TRAFFIC
TRAINING 14
& DOCTRINE 62,970.0
ARMY MATL 103
COM 156,087.0
FORCES COM IS
4,905.0
WESTERN COM
US MILITARY
ACADEMY
TOTAL 135
223,962.0
CLASS I
INOV
PROJECTS
COST
($1,000)
1
350.0






7
3,890.0
6
1,902.0
10
11,275.0


24
17,417.0
ESDP
PROJECTS
COST
($1,000)
-____-._---



2
40.0
37
2,066.0
	
	
18
8,141.0
	
120
48,592.0
158
38,916.0


335
97,775.0
CLASS
ESDF
PROJECTS
COST
($1,000)
15
2 , 956 . 0
6
635.0
1
250.0

2
70.0
94
3,867.0
1
50.0
45
9,601.0
135
60,510.0
105
22,663.0
1
20.0
	
1
300.0
	
406
100,922.0
II
PSDF
PROJECTS
COST
($1,000)
1
2,700.0

	
5
158.0
	
	
12
317.0
	
1
250.0
	
8
5,237.0
32
21,738.0
39
3,547.0

3
810.0
101
34,757.0
CLASS III
ESRO ESRE ESDL
PROJECTS PROJECTS PROJECTS
COST COST COST
($1,000) ($1,000) ($1,000)
,
1
200.0



1
20.0
1
467.0
17 8
5,148.0 326.0
23 11 34
7,170.0 562.0 14,172.0
	
14 10 51
3,155.0 538.0 5,015.0
	 	
5
900.0
	 	 	 	 	
	
56 21 99
16,140.0 1,100.0 20,433.0
OTHR
PROJECTS
COST
($1,000)






1
1.0
	 	 	
20
35,856.0
.
48
31,504.0
.-____
27
2,546.0

.
96
69,907.0
TOTAL
PROJECTS
COST
($1,000)
	 	 	
17
6,006.0
-----_____
7
835.0
1
250.0
5
158.0
	 	 	
4
110.0
144
6,290.0
4
768.0
137
131,169.0
512
342,237.0
432
92,560.0
6
920.0
4
1,110.0
1273
582,413.0
* SEE SECTION III FOR DEFINITIONS OF COMPLIANCE STATUS CATEGORIES

-------
                                                                                                       ARMY-9
ARMY - TABLE 3: NUMBER AND DOLLAR AMOUNT OF POLLUTION ABATEMENT PROJECTS PROPOSED BY
                MAJOR COMMAND/BUREAU AND ENVIRONMENTAL MEDIA FOR FISCAL YEAR 1991

                                DEPARTMENT OF ARMY
MAJOR COMMAND/
BUREAU AIR

INFO SYS COM
DIST OF WASH
RSRV-TRADOC
RSRV-FORSCOM
HEALTH SERV
NATL GUARD
MIL TRAFFIC
TRAINING
& DOCTRINE
ARMY MATL
COM
FORCES COM
WESTERN COM
US MILITARY
ACADEMY
TOTAL
PROJECTS
COST
($1,000)
4
526.0
2
300.0

5
153.0
3
90.0


18
10165.0
52
14530.0
43
4662.0


127
30431.0
DRINKING
WATER
PROJECTS
COST
($1,000)
1
150.0




1
4.0

3
320.0
12
2715.0
5
1600.0


22
4789.0
NOISE PESTICIDES RADIATION CERCLA
PROJECTS PROJECTS PROJECTS PROJECTS
COST COST COST COST
($1,000) ($1,000) ($1,000) ($1,000)
2
220.0




1
20.0
2
517.0
1 6
10.0 7411.0
4 1 13 113
1251.0 218.0 1256.0 186412.0
6 2 6 57
116.0 230.0 576.0 25401.0
4
800.0

11 3 21 183
1377.0 448.0 2052.0 220561.0
RCRA
PROJECTS
COST
($1,000)
7
4620.0
4
525.0
1
250.0

1
20.0
102
4289.0

47
9147.0
194
109504.0
172
29722.0

1
50.0
529
158127.0
TSCA
PROJECTS
COST
($1,000)
2
140.0




5
905.0
1
1.0
9
2673.0
27
11720.0
43
12685.0
1
100.0

88
28224.0
WATER
PROJECTS
COST
($1,000)
1
350.0
1
10.0



33
972.0
1
250.0
14
62496.0
71
11919.0
45
12070.0
1
20.0
3
1060.0
170
89147.0
MULTI TOTAL
PROJECTS PROJECTS
COST COST
($1,000) ($1,000)
17
6006.0
7
835.0
1
250.0
5
158.0
4
110.0
2 144
100.0 6290.0
4
768.0
39 137
38947.0 131169.0
25 512
2712.0 342237.0
53 432
5498.0 92560.0
6
920.0
4
1110.0
119 1273
47257.0 582413.0

-------
                                 FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                          DEPARTMENT OF ARMY                      US ARMY INFORMATION SYSTEM COMMAND
                 PROJECT  IDENTIFICATION
                     REQ     EST    PROJECT
  BUDGET     COMPL   COMPL  COMPL  ASSESS- MEDIA
(THOUSANDS)   STATUS  DATE    DATE   MENT    TYPE
                                                                                                                      ARMY-10
                            ADEQUACY OF  PROJECT
                          ENGIN-
                          EERING    TIME      COST
              PROJECT: HU0089S004
 RADON SURVEY ON  POST FAM HSG
 ACCT:  AFH  (NEH CONSTRUCTION)
 FORT HUACHUCA
 SIERRA VISTA                    AZ

 AZ-210120434 PROJECT: HU0089S005
 RADON  SURVEY RESERVE BLDGS
 ACCT:  OMARIOXM ARMY RESERVE)
 FORT HUACHUCA
 SIERRA VISTA                    AZ

 AZ-210120434 PROJECT: HU0089S007
 REMOVE LEAKING UNDERGROUND STORAGE TANKS
 ACCT:  DERA  - OMA (OPERATIONS AND MA
 FORT HUACHUCA
 SIERRA VISTA                    AZ

 AZ-210120434 PROJECT: HU0089S016
 UPGRADE UNDERGROUND TANKS
 ACCT:  OMA OPERATIONS & MAINT.ARMY
 FORT HUACHUCA
 SIERRA VISTA                     AZ

 AZ-210120434  PROJECT: HU0089S017
 CONSTRUCT NEW  PRACTICE FIRE FACILITY
 ACCT:  MILCON.ARMY (MCA)
 FORT HUACHUCA
 SIERRA VISTA                     AZ

 AZ-210120-+34 PROJECT: HU0089S013
 ASBESTOS REMOVAL
ACCT: DERA - OMA (OPERATIONS AND MA
 FORT HUACHUCA
SIERRA VISTA                     AZ
       20.0  ESDF
        6.0   ESDF
      300.0   ESDF
90/09 MEDIUM    AIR     ADEQUATE  ADEQUATE    ADEQUATE
                         DESIGN    TIMING    ESTIMATE
                           90/09 MEDIUM    AIR     ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
                           90/09 MEDIUM   SOLID
                                         WASTE
      125.0   ESDF    93/U   90/09 MEDIUM   SOLID
                                         WASTE
                        ADEQUATE   ADEQUATE    ADEQUATE
                         DESIGN    TIMING     ESTIMATE
                        ADEQUATE   ADEQUATE    ADEQUATE
                         DESIGN    TIMING    ESTIMATE
      800.0   ESDF
       40.0   ESDF
                           90/09 MEDIUM   SOLID    ADEQUATE  ADEQUATE   ADEQUATE
                                         WASTE     DESIGN    TIMING    ESTIMATE
                           90/09 MEDIUM   TOXIC    ADEQUATE  ADEQUATE   ADEQUATE
                                       SUBSTANCE   DESIGN    TIMING    ESTIMATE

-------
                                  FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                         DEPARTMENT OF ARMY                      US ARMY INFORMATION SYSTEM COMMAND
                 PROJECT  IDENTIFICATION
                     REQ    EST    PROJECT
  BUDGET     COMPL   COMPL   COMPL  ASSESS- MEDIA
(THOUSANDS)   STATUS  DATE    DATE   MENT    TYPE
                                                                                                                     ARMY-11
    ADEQUACY OF PROJECT
  ENGIN-
  EERING    TIME      COST
AZ-210120434  PROJECT: HU0089S006
VEHICLE WASHRACKS
ACCT: OMA OPERATIONS & MAINT.ARMY
FORT HUACHUCA
SIERRA VISTA                     AZ

MD-210120758  PROJECT: RH0089S008
REMOVE ASBESTOS FROM HAZARDOUS LOCATIONS
ACCT: OMA OPERATIONS ft MAINT.ARMY
FORT RITCHIE
FORT RITCHIE                     MD

MD-210120758  PROJECT: RH0089S001
SURVEY FORT RITCHIE FOR ASBESTOS
ACCT: OMA OPERATIONS & MAINT.ARMY
FORT RITCHIE
FORT RITCHIE                     MD

MD-210120758  PROJECT: RH0089S006
DECONTAMINATE HELL
ACCT: OMA OPERATIONS & MAINT.ARMY
FORT RITCHIE
FORT RITCHIE                     MD

MD-210120758  PROJECT: RH0089S004
TEST FOR RADON AND MITIGATION SAME
ACCT: OMA OPERATIONS & MAINT.ARMY
FORT RITCHIE
FORT RITCHIE                     MD

MD-210120758  PROJECT: RH0089S009
TEST FOR RADON AND MITIGATE SAME
ACCT: OMA OPERATIONS 8 MAINT.ARMY
FORT RITCHIE
FORT RITCHIE                     MD
      350.0  INOV
      400.0  ESDF
                           90/09  HIGH    WATER
                           90/09  MEDIUM    AIR
ADEQUATE  ADEQUATE   ADEQUATE
 DESIGN    TIMING    ESTIMATE
                                                  ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
      100.0  ESDF    94/09   90/09 MEDIUM    AIR     ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
      150.0   ESDF
                           90/09 MEDIUM  DRINKING  ADEQUATE  ADEQUATE   ADEQUATE
                                         WATER     DESIGN    TIMING    ESTIMATE
      200.0   ESDF    91/03   90/09 MEDIUM RADIATION  ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
       20.0   ESDF    91/03   90/09 MEDIUM RADIATION  ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE

-------
                                 FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                         DEPARTMENT OF ARMY                      US ARMY INFORMATION SYSTEM COMMAND
                 PROJECT  IDENTIFICATION
                     REQ    EST    PROJECT
  BUDGET     COMPL    COMPL   COMPL  ASSESS- MEDIA
(THOUSANDS)   STATUS  DATE    DATE   MENT    TYPE
                                                                     ARMY-12
                            ADEQUACY  OF  PROJECT
                          ENGIN-
                          EERING    TIME     COST
MD-210120758  PROJECT: RHOOS9S002
TEST  FOR  & REPLACE  LEAKING UNDERGROUND TANKS
ACCT: DMA OPERATIONS & MAINT.ARMY
FORT  RITCHIE
FORT  RITCHIE                     MD

MD-210120758  PROJECT: RH0089S010
CLEAN EXHAUST SHAFTS-SITE R
ACCT: DMA OPERATIONS & MAINT.ARMY
FORT  RITCHIE
FORT  RITCHIE                     MD

MD-210120758  PROJECT: RH0089S003
REMOVE PCB TRANSFORMERS AND SWITCHES
ACCT: DMA OPERATIONS & MAINT,ARMY
FORT RITCHIE
FORT RITCHIE                     MD

MD-210121051  PROJECT: DM0089S001
TEST FOR & REPLACE LEAKING UNDERGROUND TANKS
ACCT: DMA OPERATIONS & MAINT.ARMY
MICROWAVE STA DAMASCUS
DAMASCUS                         MD

PA-210120735 PROJECT: RHR089S001
TEST FOR & REPLACE LEAKING UNDERGROUND TANKS
ACCT: DMA OPERATIONS & MAINT.ARMY
FORT RITCHIE RAVEN ROCK SITE
WAYNESBORO                       PA
      675.0   ESDF    91/12   90/09  MEDIUM   SOLID    ADEQUATE  ADEQUATE   ADEQUATE
                                         WASTE     DESIGN    TIMING    ESTIMATE
    2,700.0   PSDF
90/09 MEDIUM   SOLID    ADEQUATE   ADEQUATE    ADEQUATE
               WASTE     DESIGN    TIMING     ESTIMATE
      100.0   ESDF    92/10   90/09 MEDIUM   TOXIC    ADEQUATE  ADEQUATE   ADEQUATE
                                       SUBSTANCE   DESIGN    TIMING    ESTIMATE
       10.0   ESDF    91/12   90/09 MEDIUM   SOLID    ADEQUATE  ADEQUATE   ADEQUATE
                                         WASTE     DESIGN    TIMING    ESTIMATE
       10.0   ESDF    91/12  90/09 MEDIUM   SOLID
                                         WASTE
                        ADEQUATE   ADEQUATE    ADEQUATE
                         DESIGN    TIMING    ESTIMATE
      TOTAL, US ARMY INFORMATION SYSTEM COMMAND
              6,006.0
                                                                                            17

-------
                                  FEDERAL  AGENCY  POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                          DEPARTMENT  OF ARMY                      MILITARY DISTRICT OF WASHINGTON
                 PROJECT  IDENTIFICATION
                     REG)    EST    PROJECT
  BUDGET     COMPL   COMPL  COMPL  ASSESS- MEDIA
(THOUSANDS)  STATUS  DATE   DATE   MENT    TYPE
                                                                                                                      ARMY-13
    ADEQUACY OF PROJECT
  ENGIN-
  EERING    TIME      COST
DC-210221004 PROJECT: 8803
ESTABLISHING ASBESTOS SURVEY AND REMOVAL
ACCT: DMA OPERATIONS 4 MAINT.ARMY
FORT MCNAIR
WASHINGTON                       DC

DC-210221004 PROJECT: MDW88-004
REMOVE OR REPAIR LEAKING UNDER STORAGE TANKS
ACCT: OMA OPERATIONS ft MAINT.ARMY
FORT MCNAIR
WASHINGTON                       DC

VA-210220139 PROJECT: MDW88-001
CONSTRUCT HAZMAT HAZWASTE STORAGE FACILITY
ACCT: OMA OPERATIONS & MAINT.ARMY
CAMERON STATION
ALEXANDRIA                       VA
      100.0  ESDF   92/01   90/09  MEDIUM    AIR
      200.0  ESDF   93/10   90/09  MEDIUM   SOLID
                                         WASTE
       25.0   ESDF    91/09   90/09 MEDIUM   SOLID
                                         WASTE
ADEQUATE  ADEQUATE   ADEQUATE
 DESIGN    TIMING    ESTIMATE
ADEQUATE  ADEQUATE   ADEQUATE
 DESIGN    TIMING    ESTIMATE
ADEQUATE  ADEQUATE
 DESIGN    TIMING
ADEQUATE
ESTIMATE
VA-210220139 PROJECT: MDW88-002
REMOVE OR REPLACE LEAKING UNDER STORAGE TANKS
ACCT: OMA OPERATIONS ft MAINT.ARMY
CAMERON STATION
ALEXANDRIA                       VA

VA-210220626 PROJECT: 8802
ESTABLISHING ASBESTOS SURVEY AND REMOVAL
ACCT: OMA OPERATIONS & MAINT,ARMY
FORT MYER
WASHINGTON                       VA

VA-210220626 PROJECT: MDW88-003
REMOVE OR REPLACE LEAKING UNDER STORAGE TANKS
ACCT: OMA OPERATIONS & MAINT.ARMY
FORT MYER
WASHINGTON                       VA
      150.0   ESDF    93/10   90/09 MEDIUM   SOLID
                                         WASTE
      200.0   ESRO    92/01   90/09 MEDIUM    AIR
      150.0   ESDF    93/10   90/09 MEDIUM   SOLID
                                         WASTE
ADEQUATE  ADEQUATE   ADEQUATE
 DESIGN    TIMING    ESTIMATE
                                                  ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
ADEQUATE  ADEQUATE   ADEQUATE
 DESIGN    TIMING    ESTIMATE

-------
                                 FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR  FISCAL YEAR  1991

                         DEPARTMENT OF ARMY                      MILITARY DISTRICT OF WASHINGTON
                PROJECT IDENTIFICATION
                    REQ    EST   PROJECT
  BUDGET     COMPL   COMPL  COMPL ASSESS- MEDIA
(THOUSANDS)   STATUS  DATE   DATE  MENT    TYPE
                                                                                                                     ARMY-14
    ADEQUACY OF PROJECT
  ENGIN-
  EERING    TIME      COST
VA-210220626 PROJECT: FMY089S001
DEVELOP SPCC AND ISPC PLANS
ACCT: DMA OPERATIONS 8 MAINT,ARMY
FORT MYER
WASHINGTON                       VA
       10.0   ESDF
                          90/09 MEDIUM   WATER
ADEQUATE  ADEQUATE   ADEQUATE
 DESIGN    TIMING    ESTIMATE
      TOTAL, MILITARY DISTRICT OF WASHINGTON
                                                                 835.0

-------
                                 FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR  FISCAL  YEAR  1991

                         DEPARTMENT OF ARMY                      US ARMY RSRV-TRADOC
                PROJECT IDENTIFICATION
                     REQ    EST    PROJECT
  BUDGET     COMPL   COMPL   COMPL  ASSESS- MEDIA
(THOUSANDS)   STATUS  DATE    DATE   MENT    TYPE
                                                                                                                     ARMY-15
    ADEQUACY OF PROJECT
  ENGIN-
  EERING    TIME      COST
AL-210421824 PROJECT: R01489S001
UPGRADE UNDERGROUND STORAGE TANKS - USARC
ACCT: OMARtOiM ARMY RESERVE)
USARC MONTGOMERY HWY 80
MONTGOMERY                       AL
      250.0  ESDF    93/09   90/09 MEDIUM
                                         SOLID
                                         WASTE
ADEQUATE  ADEQUATE   ADEQUATE
 DESIGN    TIMING    ESTIMATE
      TOTAL, US ARMY RSRV-TRADOC
                                                                 250.0

-------
                                 FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                         DEPARTMENT OF ARMY                      US ARMY RSRV-FORSCOM
                PROJECT IDENTIFICATION
                     REQ    EST   PROJECT
  BUDGET     COMPL   COMPL  COMPL ASSESS- MEDIA
(THOUSANDS)   STATUS   DATE   DATE  MENT    TYPE
                                                                                                                     ARMY-16
                            ADEQUACY OF PROJECT
                          ENGIN-
                          EERING    TIME      COST
PA-210520812  PROJECT: R52089S001
SCRANTON USARC ASBESTOS REMOVAL
ACCT: OMARIO&M ARMY RESERVE)
USARC SCRANTON
SCRANTON                         PA

PA-210521972  PROJECT: R52989S001
YORK USARC ASBESTOS REMOVAL
ACCT: OMAR(0&M ARMY RESERVE)
USARC YORK
YORK                             PA
       30.0   PSDF
       20.0   PSDF
                           90/09 MEDIUM    AIR
                          90/09 MEDIUM    AIR
                        ADEQUATE  ADEQUATE    ADEQUATE
                         DESIGN    TIMING    ESTIMATE
                        ADEQUATE  ADEQUATE
                         DESIGN    TIMING
                     ADEQUATE
                     ESTIMATE
PA-210522293 PROJECT: R48189S001
BETHLEHEM USARC ASBESTOS REMOVAL
ACCT: OMARIO&M ARMY RESERVE)
USARC BETHLEHEM
ALLENTOWN                        PA

PA-210522622 PROJECT: R51389S001
WOODHAVEN USARC ASBESTOS REMOVAL
ACCT: OMARIO&M ARMY RESERVE)
AFRC PHILA 06
PHILADELPHIA                     PA

PA-210522674 PROJECT: R48289S001
BLOOMSBURG USARC ASBESTOS REMOVAL
ACCT: OMARIO&M ARMY RESERVE)
USARC BLOOMSBURG
BLOOMSBURG                       PA
       25.0   PSDF
       75.0   PSDF
       8.0  PSDF
                          91/04 MEDIUM    AIR
                          90/09 MEDIUM    AIR
91/05 MEDIUM    AIR
                        ADEQUATE  ADEQUATE    ADEQUATE
                         DESIGN    TIMING    ESTIMATE
                                                  ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
ADEQUATE  ADEQUATE   ADEQUATE
 DESIGN    TIMING    ESTIMATE
      TOTAL,  US ARMY RSRV-FORSCOM
                158.0

-------
                                  FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                         DEPARTMENT OF ARMY                      US ARMY HEALTH SERVICES COM
                PROJECT IDENTIFICATION
                     REQ    EST    PROJECT
  BUDGET     COMPL   COMPL  COMPL  ASSESS- MEDIA
(THOUSANDS)  STATUS  DATE   DATE   MENT    TYPE
                                                                                                                     ARMY-17
    ADEQUACY OF PROJECT
  ENGIN-
  EERING    TIME      COST
DC-211621156 PROJECT: WR0089S001
ASBESTOS REMOVAL UTILITIES
ACCT: DMA OPERATIONS « MAINT.ARMY
WALTER REED AMC
WASHINGTON                       DC

DC-211621156 PROJECT: WR0089S002
ASBESTOS REMOVAL SURVEY
ACCT: OMA OPERATIONS & MAINT.ARMY
WALTER REED AMC
WASHINGTON                       DC

DC-211621156 PROJECT: WR0089S004
ASBESTOS REMOVAL CONTRACT
ACCT: OMA OPERATIONS & MAINT.ARMY
WALTER REED AMC
WASHINGTON                       DC

MD-211620743 PROJECT: WR-SW-2
CLEAN UP UNDERGROUND FUEL OIL SPILL
ACCT: DERA - OMA (OPERATIONS AND MA
WALTER REED AMC FOREST GLEN
FOREST GLEN                      MD
       20.0  ESDP
       20.0  ESDF
       50.0   ESDF
       20.0   ESDP
                           90/09   HIGH     AIR
                           90/09  MEDIUM    AIR
                           90/09  MEDIUM    AIR
                           90/09  HIGH
                                         SOLID
                                         WASTE
                                                  ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
                                                  ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
                                                  ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
ADEQUATE  ADEQUATE   ADEQUATE
 DESIGN    TIMING    ESTIMATE
      TOTAL, US ARMY HEALTH SERVICES COM
                                                                 110.0

-------
                                 FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                         DEPARTMENT OF ARMY                      NATIONAL GUARD BUREAU
                 PROJECT  IDENTIFICATION
                     REQ    EST    PROJECT
  BUDGET     COMPL   COMPL  COMPL  ASSESS- MEDIA
(THOUSANDS)   STATUS   DATE    DATE   MENT    TYPE
                                                                     ARMY-18
  ADEQUACY OF PROJECT
ENGIN-
EERING    TIME      COST
 AL-211801050  PROJECT: A912A
 CONST  WASHRACK W/OIL SEP AND CONN TO SEWER
 ACCT:  0  8,  M,  NATL GUARD
 ASHFORD
 ASHFORD                          AL

 AL-211801085  PROJECT: A910A
 CONST  WASHRACK W/OIL SEP AND CONN TO SEWER
 ACCT:  0  4  M,  NATL GUARD
 BAY MINETTE
 BAY MINETTE                      AL

 AL-211801155  PROJECT: AS51A
 CNST OIL SEPARATOR 4 CON TO SEWER
 ACCT:  0 4  M,  NATL GUARD
 BREWTON
 BREWTON                          AL

AL-211S01175  PROJECT: A905A
CONST  WASHRACK W/OIL SEP 4 CONN TO SEWER
ACCT:  0 4  M,  NATL GUARD
BUTLER
BUTLER                           AL

AL-211801215  PROJECT: A954A
CNST WASHRACK W/OIL SEPARATOR & CONN TO SEWER
ACCT:  0 4 M, NATL GUARD
CHILDER5BURG
CHILDERSBURG                     AL

AL-211801305 PROJECT: A909A
CONST WASHRACK W/OIL SEP AND CONN TO SEWER
ACCT: 0 4 M, NATL GUARD
EVERGREEN
EVERGREEN                        AL
                                                       18.0  ESDP
       18.0   ESDP
       18.0   ESDP
       18.0   ESDP
       18.0   ESDP
       18.0   ESDP
                                                                           90/09  HIGH     WATER
                           90/09  HIGH    WATER
                           90/09  HIGH    WATER
                           90/09  HIGH    WATER
                           90/09  HIGH    WATER
                           90/09  HIGH    WATER
                                                  ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
                                                  ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
                                                  ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
                                                  ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
                                                  ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
                                                  ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE

-------
                                  FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                         DEPARTMENT OF ARMY                      NATIONAL GUARD BUREAU
                PROJECT IDENTIFICATION
                     REQ     EST   PROJECT
  BUDGET     COMPL   COMPL   COMPL ASSESS- MEDIA
(THOUSANDS)   STATUS   DATE    DATE  MENT    TYPE
                                                                                                                     ARMY-19
    ADEQUACY OF PROJECT
  ENGIN-
  EERING    TIME      COST
AL-211801320 PROJECT: A946A
CNST WASHRACK W/OIL SEPARATOR & CONN TO SEWER
ACCT: 0 4 M, NATL GUARD
FLORA LA
FLORALA                          AL

AL-211801350 PROJECT: A945A
CNST WASHRACK W/OIL SEPARATOR 4 CONN TO SEWER
ACCT: 0 4 M, NATL GUARD
GENEVA
GENEVA                           AL

AL-211801520 PROJECT: A768A
CNST OIL SEPARATOR & CONNECT TO SAN SEW
ACCT: 0 * M, NATL GUARD
BROOKLEY FIELD ARNG
MOBILE                           AL

AL-211801600 PROJECT: NGB103
ALTERNATE & ENLARGE EXISTING SYSTEM
ACCT: MILCON, NATL GUARD
FORT RUCKER
OZARK                            AL

AL-211801690 PROJECT: A854A
INSTALL OIL & GREASE SEP 4 CON TO SAN SEWER
ACCT: 0 4 M, NATL GUARD
TROY
TROY                             AL

AR-211805255 PROJECT: GB3789S017
CLASS III STORAGE ISSUE FACILITY (PETROLEUM)
ACCT: FUNDING ACCOUNT UNKNOWN
CAMP J.T.  ROBINSON
NORTH LITTLE ROCK                AR
       18.0   ESDP
       18.0   ESDP
       18.0   ESDP
      200.0   ESDP
       18.0   ESDP
                           90/09  HIGH    WATER
                          90/09  HIGH    WATER
                          90/09  HIGH    WATER
                          91/01  HIGH    WATER
                          90/09  HIGH    WATER
      195.0   ESDF    90/12  90/09 MEDIUM   SOLID
                                         WASTE
ADEQUATE  ADEQUATE   ADEQUATE
 DESIGN    TIMING    ESTIMATE
                                                  ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
                                                  ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
                                                  ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
                                                  ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
ADEQUATE  ADEQUATE   ADEQUATE
 DESIGN    TIMING    ESTIMATE

-------
                                  FEDERAL  AGENCY  POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                          DEPARTMENT  OF  ARMY                      NATIONAL GUARD BUREAU
                 PROJECT  IDENTIFICATION
                    REQ    EST   PROJECT
  BUDGET     COMPL   COMPL  COMPL ASSESS- MEDIA
(THOUSANDS)   STATUS  DATE   DATE  MENT    TYPE
                                                                                                                      ARMY-20
                            ADEQUACY  OF  PROJECT
                          ENGIN-
                          EERING    TIME     COST
 AR-211805255  PROJECT:  GB3789S020
 SOLID  WASTE FACILITY  COMPLIANCE ASSISTANCE
 ACCT:  0  &  M,  NATL  GUARD
 CAMP  J.T.  ROBINSON
 NORTH  LITTLE  ROCK                AR

 AR-211805255  PROJECT:  GB3789S023
 CSMS UNDERGROUND STORAGE TANK REMOVAL
 ACCT:  0  &  M,  NATL  GUARD
 CAMP J.T.  ROBINSON
 NORTH  LITTLE  ROCK                AR

 AR-211805255  PROJECT:  GB3789S024
 OMS-1A (ROGERS) LEAK DETECTION TANK EQUIPMENT
 ACCT:  0  &  M,  NATL  GUARD
 CAMP J.T.  ROBINSON
 NORTH  LITTLE  ROCK                AR

 AR-211805255  PROJECT:  GB3789S026
 OMS-11 (JONESBORO) LEAK DETECTION SYSTEM
 ACCT:  0  &  M,  NATL GUARD
 CAMP J.T.  ROBINSON
 NORTH  LITTLE  ROCK                AR

 AR-211805255  PROJECT:  GB3789S004
 OMS-3  WASHRACK W/OIL/WATER SEPARATOR
 ACCT:  0  &  M,  NATL GUARD
 CAMP J.T.  ROBINSON
 NORTH  LITTLE  ROCK                AR

 AR-211805255  PROJECT:  GB3789S009
OMS-6 WASHRACK W/OIL/WATER SEPARATOR
ACCT: 0  &  M,  NATL GUARD
CAMP J.T.  ROBINSON
NORTH  LITTLE  ROCK                AR
       20.0   ESDF
90/09 MEDIUM   SOLID
               WASTE
        7.0   ESDF    98/12   90/09 MEDIUM   SOLID
                                         WASTE
         .0   ESDF   91/12  90/09 MEblUM   SOLID
                                         WASTE
       6.0   ESDF   91/12  90/09 MEDIUM   SOLID
                                         WASTE
       20.0  ESDF   91/05  90/09 MEDIUM   WATER
       20.0  ESDF   91/03  90/09 MEDIUM   WATER
ADEQUATE  ADEQUATE   ADEQUATE
 DESIGN    TIMING    ESTIMATE
                        ADEQUATE   ADEQUATE   ADEQUATE
                         DESIGN    TIMING    ESTIMATE
                        ADEQUATE   ADEQUATE   ADEQUATE
                         DESIGN    TIMING    ESTIMATE
                        ADEQUATE   ADEQUATE   ADEQUATE
                         DESIGN    TIMING    ESTIMATE
                        ADEQUATE   ADEQUATE    ADEQUATE
                         DESIGN    TIMING    ESTIMATE
                        ADEQUATE   ADEQUATE    ADEQUATE
                         DESIGN    TIMING    ESTIMATE

-------
                                  FEDERAL  AGENCY  POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                          DEPARTMENT OF ARMY                      NATIONAL GUARD BUREAU
                PROJECT IDENTIFICATION
                     REQ    EST   PROJECT
  BUDGET     COMPL   COMPL  COMPL ASSESS-  MEDIA
(THOUSANDS)  STATUS  DATE   DATE  MENT    TYPE
                                                                                                                      ARMY-21
    ADEQUACY OF PROJECT
  ENGIN-
  EERING    TIME      COST
AR-211605255 PROJECT: GB3789S010
OMS-7 WASHRACK W/OIL/WATER SEPARATOR
ACCT: 0 i M, NATL GUARD
CAMP J.T. ROBINSON
NORTH LITTLE ROCK                AR

AR-211805255 PROJECT: GB3789S011
OMS-8 WASHRACK W/OIL/WATER SEPARATOR
ACCT: 0 8, M, NATL GUARD
CAMP J.T. ROBINSON
NORTH LITTLE ROCK                AR

AR-211805255 PROJECT: GB3789S014
OMS11A WASHRACK W/OIL/WATER SEPARATOR
ACCT: 0 & M, NATL GUARD
CAMP J.T. ROBINSON
NORTH LITTLE ROCK                AR

AR-211805255 PROJECT: GB3789S015
OMS12A WASHRACK W/OIL/WATER SEPARATOR
ACCT: 0 & M, NATL GUARD
CAMP J.T. ROBINSON
NORTH LITTLE ROCK                AR

AR-211805255 PROJECT: GB3789S016
OMS-13 WASHRACK W/OIL/WATER SEPARATOR
ACCT: 0 » M, NATL GUARD
CAMP J.T. ROBINSON
NORTH LITTLE ROCK                AR

CA-211806535 PROJECT: CSL089S001
CSLO LANDFILL CLOSURE/POST CLOSURE PLANS
ACCT: 0 & M, NATL GUARD
CAMP SAN LUIS OBISPO
SAN LUIS OBISPO                  CA
       20.0  ESDF   91/06  90/09 MEDIUM    WATER    ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
       20.0  ESDF   91/06   90/09  MEDIUM   WATER
       20.0   ESDF    91/07  90/09  MEDIUM   WATER
       20.0   ESDF    91/12   90/09  MEDIUM   WATER
       20.0   ESDF    90/11   90/09  MEDIUM   WATER
                                                  ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
ADEQUATE  ADEQUATE   ADEQUATE
 DESIGN    TIMING    ESTIMATE
                                                  ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
                                                  ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
      100.0   ESDF    92/01   90/09 MEDIUM   WATER    ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE

-------
                                 FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR  1991

                          DEPARTMENT OF ARMY                      NATIONAL GUARD BUREAU
                 PROJECT  IDENTIFICATION
                    REQ    EST   PROJECT
  BUDGET     COMPL   COMPL  COMPL ASSESS- MEDIA
(THOUSANDS)   STATUS  DATE   DATE  MENT    TYPE
                                                                     ARMY-22
  ADEQUACY OF PROJECT
ENGIN-
EERING    TIME      COST
 CO-211808010  PROJECT:  GB6189S001
 TANK  TIGHTNESS  TESTING
 ACCT: MILCON, NATL GUARD
 AURORA
 AURORA                           CO

 CO-211808080  PROJECT:  GB5689S001
 TANK  TIGHTNESS  TESTING
 ACCT: MILCON, NATL GUARD
 FORT  COLLINS
 FORT  COLLINS                     CO

 CO-211808085  PROJECT:  GB5789S001
 TANK  TIGHTNESS  TESTING
 ACCT: MILCON, NATL GUARD
 FORT MORGAN
 FORT MORGAN                      CO

 CO-211808090 PROJECT: GB5589S001
 TANK TIGHTNESS TESTING
 ACCT: MILCON, NATL GUARD
 CAMP GEORGE WEST
 GOLDEN                           CO

 CO-211808110 PROJECT: 6B6289S001
 TANK TIGHTNESS TESTING
 ACCT: MILCON, NATL GUARD
 LA JUNTA
 LA JUNTA                         CO

 CO-211608120 PROJECT: GB6389S001
TANK TIGHTNESS TESTING
ACCT: MILCON, NATL GUARD
 LAS ANIMAS
 LAS ANIMAS                       CO
       13.0   ESDF    91/12  91/12 MEDIUM   SOLID      NOT       NOT        NOT
                                         WASTE     AVAIL     AVAIL      AVAIL
       13.0   ESDF    91/12  91/12 MEDIUM   SOLID      NOT       NOT        NOT
                                         WASTE     AVAIL     AVAIL      AVAIL
       13.0   ESDF    91/12  91/12 MEDIUM   SOLID      NOT       NOT        NOT
                                         WASTE     AVAIL     AVAIL      AVAIL
       13.0   ESDF    91/12  91/12 MEDIUM   SOLID      NOT       NOT        NOT
                                         WASTE     AVAIL     AVAIL      AVAIL
       13.0   ESDF   91/12  91/12 MEDIUM   SOLID      NOT       NOT        NOT
                                         WASTE     AVAIL     AVAIL      AVAIL
       13.0   ESDF   91/12  91/12 MEDIUM   SOLID      NOT       NOT        NOT
                                         WASTE     AVAIL     AVAIL      AVAIL

-------
                                 FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                         DEPARTMENT OF ARMY                      NATIONAL GUARD BUREAU
                PROJECT IDENTIFICATION
                     REQ    EST    PROJECT
  BUDGET     COMPL   COMPL   COMPL  ASSESS- MEDIA
(THOUSANDS)   STATUS  DATE    DATE   MENT    TYPE
                                                                                                                     ARMY-23
    ADEQUACY OF PROJECT
  ENGIN-
  EERING    TIME      COST
CO-211B08125 PROJECT: GB5S89S001
TANK TIGHTNESS TESTING
ACCT: MILCON, NATL GUARD
LONGMONT
LONGMONT                         CO

CO-211808135 PROJECT: GB5989S001
TANK TIGHTNESS TESTING
ACCt: MILCON, NATL GUARD
MONTROSE
MONTROSE                         CO

CO-211808140 PROJECT: GB6089S001
TANK TIGHTNESS TESTING
ACCT: MILCON, NATL GUARD
PUEBLO
PUEBLO                           CO

CT-211809050 PROJECT: GB6589S001
REPLACEMENT OF UNDERGROUND STORAGE TANKS
ACCT: 0 ft M, NATL GUARD
HARTFORD
HARTFORD                         CT

CT-211809180 PROJECT: GB6489S001
REPLACEMENT OF FUEL FARM
ACCT: 0 ft M, NATL GUARD
WINDSOR LOCKS
WINDSOR LOCKS                    CT

DE-211810005 PROJECT: GC3989S001
TANK TESTING/REPLACEMENT AND/OR RETROFIT
ACCT: 0 & M, NATL GUARD
BETHANY BEACH
BETHANY BEACH                    DE
       13.0   ESDF    91/12   91/12 MEDIUM   SOLID
                                         WASTE
       13.0   ESDF    91/12   91/12 MEDIUM   SOLID
                                         WASTE
       13.0   ESDF    91/12   91/12 MEDIUM   SOLID
                                         WASTE
        8.0   ESDF    89/09   90/09 MEDIUM   SOLID
                                         WASTE
    2,450.0   ESDF    89/09   90/09 MEDIUM   SOLID
                                         WASTE
       30.0   ESDP   89/12   90/09  HIGH    SOLID
                                         WASTE
  NOT
 AVAIL
  NOT
 AVAIL
  NOT
 AVAIL
  NOT
 AVAIL
  NOT
 AVAIL
 NOT
AVAIL
 NOT
AVAIL
 NOT
AVAIL
 NOT
AVAIL
 NOT
AVAIL
 NOT
AVAIL
 NOT
AVAIL
 NOT
AVAIL
 NOT
AVAIL
 NOT
AVAIL
ADEQUATE  ADEQUATE    ADEQUATE
 DESIGN    TIMING    ESTIMATE

-------
                                  FEDERAL  AGENCY  POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                          DEPARTMENT OF  ARMY                      NATIONAL GUARD BUREAU
                 PROJECT IDENTIFICATION
                     REQ    EST    PROJECT
  BUDGET     COMPL   COMPL  COMPL  ASSESS- MEDIA
(THOUSANDS)   STATUS   DATE    DATE   MENT    TYPE
                                                                     ARMY-24
             ADEQUACY OF PROJECT
           ENGIN-
           EERING    TIME      COST
 DE-211810010 PROJECT:  GC4289S001
 TANK TESTING/RETROFIT  AND/OR REPLACEMENT
 ACCT:  0 & M, NATL GUARD
 DAGSBORO
 DAGSBORO                         DE

 DE-211810045 PROJECT:  GC4389S001
 TANK TESTING/RETROFIT  AND/OR REPLACEMENT
 ACCT:  0 & M, NATL GUARD
 MIDDLETOWN
 MIDDLETOWN                       DE

 DE-211810055 PROJECT:  GC4089S001
 TANK TESTING/RETROFIT  AND/OR REPLACEMENT
 ACCT:  0AM, NATL GUARD
 NEW  CASTLE
 NEW  CASTLE                       DE

 DE-211810060 PROJECT:  GC4189S001
 TANK TESTING/RETROFIT  AND/OR REPLACEMENT
 ACCT:  0  &  M,  NATL GUARD
 NEW  CASTLE
 NEW  CASTLE                        DE

 DE-211810065 PROJECT:  GC4489S001
 TANK TESTING/RETROFIT  AND/OR  REPLACEMENT
 ACCT:  0  & M,  NATL GUARD
 SEAFORD
 SEAFORD                          DE

 DE-211810080  PROJECT:  GC4589S001
 TANK TESTING/RETROFIT  AND/OR REPLACEMENT
ACCT: 0  S M, NATL GUARD
WILMINGTON
WILMINGTON                       DE
       45.0   ESDP   89/12   90/09   HIGH    SOLID
                                         WASTE
       30.0   ESDP   89/12   90/09   HIGH    SOLID
                                         WASTE
       30.0   ESDP    89/12   90/09  HIGH
       75.0   ESDP    89/12   90/09  HIGH
SOLID
WASTE
SOLID
WASTE
       15.0   ESDP   89/12   90/09  HIGH    SOLID
                                         WASTE
       45.0   ESDP   89/12   90/09  HIGH    SOLID
                                         WASTE
         ADEQUATE  ADEQUATE   ADEQUATE
          DESIGN    TIMING    ESTIMATE
         ADEQUATE  ADEQUATE   ADEQUATE
          DESIGN    TIMING    ESTIMATE
                                                  ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
ADEQUATE  ADEQUATE   ADEQUATE
 DESIGN    TIMING    ESTIMATE
         ADEQUATE  ADEQUATE   ADEQUATE
          DESIGN    TIMING    ESTIMATE
         ADEQUATE  ADEQUATE   ADEQUATE
          DESIGN    TIMING    ESTIMATE

-------
                                 FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                         DEPARTMENT OF ARMY                      NATIONAL GUARD BUREAU
                PROJECT IDENTIFICATION
                                    REQ    EST   PROJECT
                 BUDGET     COMPL   COMPL  COMPL ASSESS- MEDIA
               (THOUSANDS)  STATUS  DATE   DATE  MENT    TYPE
                                                                                                                     ARMY-25
                            ADEQUACY  OF  PROJECT
                          ENGIN-
                          EERING    TIME     COST
DE-211610080 PROJECT: GC4589S002
TANK TESTING/RETROFIT AND/OR REPLACEMENT
ACCT: 0 » M, NATL GUARD
WILMINGTON
WILMINGTON                       DE

FL-211812035 PROJECT: A896A
WASH RACK OIL WATER SEPARATOR
ACCT: 0 & M, NATL GUARD
BONIFAY
BONIFAY                          FL
                      15.0  ESDP   89/12  90/09  HIGH
                      19.0  ESDP
90/09  HIGH
                                                         SOLID     ADEQUATE  ADEQUATE   ADEQUATE
                                                         WASTE     DESIGN    TIMING    ESTIMATE
                                                         WATER     ADEQUATE  ADEQUATE   ADEQUATE
                                                                  DESIGN    TIMING    ESTIMATE
FL-211812130 PROJECT: A898A
WASH RACK OIL WATER SEPARATOR
ACCT: 0 & M, NATL GUARD
CRAIG FIELD
JACKSONVILLE
                                                       19.0  ESDP
                                          90/09  HIGH     WATER
FL
FL-211812155 PROJECT: GB7089S001
REPLACEMENT OF UNDERGROUND STORAGE TANKS
ACCT: 0 * M, NATL GUARD
MIAMA
MIAMI                            FL

FL-211812230 PROJECT: GB7189S001
REPLACEMENT OF UNDERGROUND STORAGE TANKS
ACCT: 0 & M, NATL GUARD
ST AUGUSTINE
ST AUGUSTINE                     FL

FL-211812235 PROJECT: GB7389S001
REPLACEMENT OF UNDERGROUND STORAGE TANKS
ACCT: 0 i M, NATL GUARD
ST. PETERSBURG
ST. PETERSBURG                   FL
                                                       40.0  ESDP   95/12  90/09  HIGH
                      20.0  ESDP   89/12  90/09  HIGH
                      20.0  ESDP   89/12  90/09  HIGH
                                                         SOLID
                                                         WASTE
                                                         SOLID
                                                         WASTE
                                                         SOLID
                                                         WASTE
                                                                  ADEQUATE  ADEQUATE   ADEQUATE
                                                                  DESIGN    TIMING    ESTIMATE
                        ADEQUATE   ADEQUATE   ADEQUATE
                         DESIGN     TIMING    ESTIMATE
                        ADEQUATE  ADEQUATE   ADEQUATE
                         DESIGN    TIMING    ESTIMATE
                        ADEQUATE  ADEQUATE   ADEQUATE
                        DESIGN    TIMING    ESTIMATE

-------
                                  FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                          DEPARTMENT OF ARMY                      NATIONAL GUARD BUREAU
                 PROJECT  IDENTIFICATION
                     REQ     EST    PROJECT
  BUDGET     COMPL    COMPL   COMPL  ASSESS- MEDIA
(THOUSANDS)   STATUS   DATE    DATE   MENT    TYPE
                                                                                                                     ARMY-26
                            ADEQUACY  OF  PROJECT
                          ENGIN-
                          EERING    TIME     COST
 FL-211812240  PROJECT:  GB7289S001
 REPLACEMENT OF  UNDERGROUND STORAGE TANKS
 ACCT:  0  &  M,  NATL  GUARD
 CAMP  BLANDIN6
 STARKE                          FL

 FL-211812240  PROJECT:  GB7289S002
 REPLACEMENT OF  UNDERGROUND STORAGE TANKS
 ACCT:  0  &  M,  NATL  GUARD
 CAMP BLANDING
 STARKE                          FL

 FL-211812250  PROJECT:  GB7489S001
 REPLACEMENT OF  UNDERGROUND STORAGE TANKS
 ACCT:  0  & M,  NATL  GUARD
 TALLAHASSEE
 TALLAHASSEE                      FL

 FL-211812255  PROJECT:  GB7589S001
 REPLACEMENT OF  UNDERGROUND STORAGE TANKS
 ACCT:  0  * M,  NATL  GUARD
 TAMPA
 TAMPA                            FL

 FL-211612265  PROJECT:  GB7689S001
 REPLACEMENT OF  UNDERGROUND STORAGE TANKS
 ACCT:  0  & M,  NATL  GUARD
 WEST PALM BEACH
 WEST PALM BEACH                  FL

HI-211815010  PROJECT:  GB7989S006
REMOVE UNDERGROUND STORAGE TANKS
ACCT: 0  & M,  NATL  GUARD
HILO
HILO                             HI
      160.0   ESDP    89/12   90/09  HIGH    SOLID
                                         WASTE
       40.0   ESDP    89/12   90/09  HIGH    SOLID
                                         WASTE
       40.0   ESDP    95/12   90/09  HIGH
       20.0   ESDP    95/12  90/09  HIGH
       20.0   ESDF
       70.0   ESDF
                                         SOLID
                                         WASTE
                                         SOLID
                                         WASTE
90/09 MEDIUM   SOLID
               WASTE
                          90/09 MEDIUM   SOLID
                                         WASTE
                        ADEQUATE   ADEQUATE    ADEQUATE
                         DESIGN    TIMING     ESTIMATE
                        ADEQUATE   ADEQUATE    ADEQUATE
                         DESIGN    TIMING     ESTIMATE
                        ADEQUATE   ADEQUATE    ADEQUATE
                         DESIGN    TIMING     ESTIMATE
                        ADEQUATE   ADEQUATE    ADEQUATE
                         DESIGN    TIMING    ESTIMATE
                                                  ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
                        ADEQUATE  ADEQUATE   ADEQUATE
                         DESIGN    TIMING    ESTIMATE

-------
                                 FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                         DEPARTMENT OF ARMY                      NATIONAL GUARD BUREAU
                PROJECT IDENTIFICATION
                     REQ    EST   PROJECT
  BUDGET     COMPL   COMPL  COMPL  ASSESS- MEDIA
(THOUSANDS)   STATUS  DATE    DATE   MENT    TYPE
                                                                                                                      ARMY-27
    ADEQUACY OF PROJECT
  ENGIN-
  EERING    TIME      COST
IA-211819220 PROJECT: GC0589S002
PROVIDE HAZ WASTE ACCUMULATION AREAS
ACCT: 0 i M, NATL GUARD
CAMP DODGE
JOHNSTON                         IA

IA-211819220 PROJECT: GC0589S001
UNDERGROUND STORAGE TANK UPGRADES
ACCT: 0 & M, NATL GUARD
CAMP DODGE
JOHNSTON                         IA

IL-211617005 PROJECT: GB8689S001
TANK TESTING AND UPGRADE
ACCT: 0 4 M, NATL GUARD
BLOOMINGTON
BLOOMINGTON                      IL

IL-211817015 PROJECT: GB8789S001
TANK TESTING AND UPGRADE
ACCT: 0 8, M, NATL GUARD
CAR30NDALE
CARBON'DALE                       IL

IL-211817025 PROJECT: GB8889S001
TANK TESTING AND UPGRADE
ACCT: 0 t M, NATL GUARD
MIDWAY
CHICAGO                          IL

IL-211817045 PROJECT: GB9989S001
TANK TESTING AND UPGRADE
ACCT: 0 S M, NATL GUARD
GENERAL JONES
CHICAGO                          IL
       30.0  ESDP
       20.0  ESDF
                           90/09   LOW
                           90/09   HIGH
                                          SOLID
                                          WASTE
                                          SOLID
                                          WASTE
        2.0  ESDF    89/12   90/09   HIGH     SOLID
                                          WASTE
         .0  ESDF    89/12   90/09   HIGH     SOLID
                                          WASTE
        2.0  ESDF    89/12   90/09   HIGH     SOLID
                                          WASTE
        2.0   ESDF    89/12   90/09  MEDIUM   SOLID
                                         WASTE
ADEQUATE  ADEQUATE   ADEQUATE
 DESIGN    TIMING    ESTIMATE
ADEQUATE  ADEQUATE     LOW
 DESIGN    TIMING    ESTIMATE
ADEQUATE  ADEQUATE   ADEQUATE
 DESIGN    TIMING    ESTIMATE
ADEQUATE  ADEQUATE   ADEQUATE
 DESIGN    TIMING    ESTIMATE
ADEQUATE  ADEQUATE   ADEQUATE
 DESIGN    TIMING    ESTIMATE
ADEQUATE  ADEQUATE   ADEQUATE
 DESIGN    TIMING    ESTIMATE

-------
                                  FEDERAL AGENCY  POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                          DEPARTMENT OF  ARMY                      NATIONAL GUARD BUREAU
                 PROJECT IDENTIFICATION
                     REQ    EST    PROJECT
  BUDGET     COMPL   COMPL  COMPL  ASSESS- MEDIA
(THOUSANDS)   STATUS  DATE    DATE   MENT    TYPE
                                                                     ARMY-28
    ADEQUACY OF PROJECT
  ENGIN-
  EERING    TIME      COST
 IL-211817075 PROJECT:  GB9089S001
 TANK TESTING AND UPGRADE
 ACCT: 0 4 M, NATL GUARD
 DECATUR
 DECATUR                          IL

 IL-211817095 PROJECT:  GB9189S001
 TANK TESTING AND UPGRADE
 ACCT: 0 4 M, NATL GUARD
 EAST ST.  LOUIS
 EAST ST.  LOUIS                    IL

 IL-211817140 PROJECT:  GB9389S001
 TANK TESTING AND  UPGRADE
 ACCT:  0 4 M,  NATL GUARD
 KEWANEE
 KEHANEE                          IL

 IL-211817155  PROJECT:  GB9589S001
 TANK  TESTING  AND  UPGRADE
 ACCT:  0 &  M,  NATL GUARD
 MACOMB
 MACOMB                           IL

 IL-211817160  PROJECT:  GB9489S001
 TANK TESTING  AND  UPGRADE
 ACCT:  0 &  M,  NATL  GUARD
 MARSEILLES
 MARSEILLES                        IL

 IL-211817165  PROJECT:  GB9689S001
 TANK TESTING  AND UPGRADE
ACCT:  0 4 M,  NATL  GUARD
MATTOON
MATTOON                           IL
        3.0  ESDF    89/12   90/09  MEDIUM   SOLID
                                         WASTE
        7.0  ESDF    89/12   90/09 MEDIUM   SOLID
                                         WASTE
        2.0   ESDF   89/12   90/09 MEDIUM   SOLID
                                         WASTE
        4.0   ESDF   89/12   90/09 MEDIUM   SOLID
                                         WASTE
        3.0   ESDF   89/12   90/09 MEDIUM   SOLID
                                         WASTE
        3.0   ESDF   89/12  90/09 MEDIUM   SOLID
                                         WASTE
ADEQUATE  ADEQUATE   ADEQUATE
 DESIGN    TIMING    ESTIMATE
ADEQUATE  ADEQUATE   ADEQUATE
 DESIGN    TIMING    ESTIMATE
ADEQUATE  ADEQUATE   ADEQUATE
 DESIGN    TIMING    ESTIMATE
ADEQUATE  ADEQUATE   ADEQUATE
 DESIGN    TIMING    ESTIMATE
ADEQUATE  ADEQUATE   ADEQUATE
 DESIGN    TIMING    ESTIMATE
ADEQUATE  ADEQUATE   ADEQUATE
 DESIGN    TIMING    ESTIMATE

-------
                                  FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                         DEPARTMENT OF ARMY                      NATIONAL GUARD BUREAU
                PROJECT IDENTIFICATION
                     REQ    EST    PROJECT
  BUDGET     COMPL   COMPL  COMPL  ASSESS- MEDIA
(THOUSANDS)   STATUS  DATE    DATE   MENT    TYPE
                                                                                                                      ARMY-29
    ADEQUACY OF PROJECT
  ENGIN-
  EERING    TIME      COST
IL-211817180 PROJECT: GB9789S001
TANK TESTING AND UPGRADE
ACCT: 0 » M, NATL GUARD
NORTH RIVERSIDE
NORTH RIVERSIDE                  IL

IL-211817190 PROJECT: GB9889S001
TANK TESTING AND UPGRADE
ACCT: 0 t M, NATL GUARD
PARIS
PARIS                            IL

IL-211817195 PROJECT: GB9989S001
TANK TESTING AND UPGRADE
ACCT: 0 & M, NATL GUARD
PEORIA
PEORIA                           IL

IL-211817205 PROJECT: GC0189S001
TANK TESTING AND UPGRADE
ACCT: 0 t M, NATL GUARD
QUINCY
QUINCY                           IL

IL-211817210 PROJECT: GA6989S001
TANK TESTING AND UPGRADE
ACCT: 0 & M, NATL GUARD
ROCK FALLS
ROCK FALLS                       IL

IL-211817335 PROJECT: GC0389S002
TANK TESTING AND UPGRADE
ACCT: 0 i M, NATL GUARD
CAMP LINCOLN
SPRINGFIELD                      IL
        9.0  ESDF    89/12   90/09 MEDIUM   SOLID
                                         WASTE
        1.0   ESDF    89/12   90/09 MEDIUM   SOLID
                                         WASTE
        1.0   ESDF    89/12   90/09 MEDIUM   SOLID
                                         WASTE
        2.0   ESDF    89/12   90/09 MEDIUM   SOLID
                                         WASTE
        3.0   ESDF    89/12   90/09 MEDIUM   SOLID
                                         WASTE
        2.0   ESDF   89/12  90/09 MEDIUM   SOLID
                                         WASTE
ADEQUATE  ADEQUATE   ADEQUATE
 DESIGN    TIMING    ESTIMATE
ADEQUATE  ADEQUATE   ADEQUATE
 DESIGN    TIMING    ESTIMATE
ADEQUATE  ADEQUATE   ADEQUATE
 DESIGN    TIMING    ESTIMATE
ADEQUATE  ADEQUATE   ADEQUATE
 DESIGN    TIMING    ESTIMATE
ADEQUATE  ADEQUATE   ADEQUATE
 DESIGN    TIMING    ESTIMATE
ADEQUATE  ADEQUATE   ADEQUATE
 DESIGN    TIMING    ESTIMATE

-------
                                  FEDERAL  AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                          DEPARTMENT OF  ARMY                      NATIONAL GUARD BUREAU
                 PROJECT IDENTIFICATION
                     REQ     EST    PROJECT
  BUDGET     COMPL    COMPL   COMPL  ASSESS- MEDIA
(THOUSANDS)   STATUS   DATE    DATE   MENT    TYPE
                                                                                                                      ARMY-30
    ADEQUACY OF PROJECT
  ENGIN-
  EERING    TIME      COST
 IL-211817260 PROJECT:  GC0489S001
 TANK TESTING AND UPGRADE
 ACCT:  0 & M, NATL GUARD
 URBANA
 URBANA                           IL

 KY-211821085 PROJECT:  FKF089S003
 TEST TWO UNDERGROUND TANKS
 ACCT:  0 & M, NATL GUARD
 FRANKFORT
 FRANKFORT                        KY

 KY-211821095 PROJECT:  GC3289S002
 TEST TWO UNDERGROUND TANKS
 ACCT:  0 & M,  NATL GUARD
 GREENVILLE
 GREENVILLE                        KY

 ME-211823010  PROJECT:  6C4789S002
 CONSTRUCT SPILL  CONTAINMENT FACILITIES
 ACCT:  0 8 M,  NATL GUARD
 AUBURN
 AUBU3N                           ME

 ME-211823020  PROJECT:  GC4889S003
 REPLACEMENT OF UNDERGROUND STORAGE TANKS
 ACCT:  0  i. M,  NATL  GUARD
 CAMP KEYES
 AUGUSTA                           ME

 ME-211823030  PROJECT:  GC4989S005
 REMOVAL ASBESTOS  IN HANGER
ACCT:  0 & M,  NATL  GUARD
BANGOR
BANGOR                            ME
        2.0   ESDF    89/12   90/09 MEDIUM   SOLID    ADEQUATE  ADEQUATE   ADEQUATE
                                         WASTE     DESIGN    TIMING    ESTIMATE
       11.0   ESDF
       12.0   ESDF
       30.0   PSDF
       50.0   ESDF
       75.0   ESDP
                           90/09 MEDIUM   SOLID    ADEQUATE  ADEQUATE   ADEQUATE
                                         WASTE     DESIGN    TIMING    ESTIMATE
                           90/09 MEDIUM   SOLID
                                         WASTE
                           90/09 MEDIUM   WATER
ADEQUATE  ADEQUATE   ADEQUATE
 DESIGN    TIMING    ESTIMATE
                                                    NOT       NOT
                                                   AVAIL     AVAIL
                          90/09 MEDIUM   SOLID      NOT       NOT
                                         WASTE     AVAIL     AVAIL
                       NOT
                      AVAIL
                       NOT
                      AVAIL
                          90/09  HIGH    TOXIC    ADEQUATE  ADEQUATE   ADEQUATE
                                       SUBSTANCE   DESIGN    TIMING    ESTIMATE

-------
                                  FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                          DEPARTMENT OF ARMY                      NATIONAL GUARD BUREAU
                 PROJECT  IDENTIFICATION
                     REQ    EST    PROJECT
  BUDGET     COMPL   COMPL   COMPL  ASSESS- MEDIA
(THOUSANDS)   STATUS  DATE    DATE   MENT    TYPE
                                                                                                                     ARMY-31
                            ADEQUACY  OF  PROJECT
                          ENGIN-
                          EERING    TIME     COST
ME-211823030  PROJECT: GC4989S006
REMOVAL OF ASBESTOS IN FACILITY
ACCT: 0 * M,  NATL GUARD
BANSOR
BANGOR                           ME

ME-211823030  PROJECT: GC4989S004
REMOVAL OF ASBESTOS IN FLIGHT FACILITY
ACCT: 0 » M,  NATL GUARD
BANGOR
BANGOR                           ME

ME-211823030  PROJECT: GC4989S008
CONSTRUCT SPILL CONTAINMENT FACILITIES
ACCT: 0 t M,  NATL GUARD
BANGOR
BANGOR                           ME

ME-211823075  PROJECT: GC5089S002
REMOVAL OF ASBESTOS PIPE INSULATION
ACCT: 0 & M,  NATL GUARD
CARIBOU
CARIBOU                          ME

ME-2M823075  PROJECT: GC5089S003
CONSTRUCT SPILL CONTAINMENT FACILITIES
ACCT: 0 4 M,  NATL GUARD
CARIBOU
CARIBOU                          ME

ME-211823140  PROJECT: GC5189S002
REMOVAL OF ASBESTOS PIPE INSULATION
ACCT: 0 & M, NATL GUARD
PORTLAND
PORTLAND                         ME
      300.0   ESDP
       30.0   ESDF
         .0   ESDF
       50.0   ESDF
       30.0   PSDF
      450.0   ESDP
                           90/09  HIGH    TOXIC    ADEQUATE  ADEQUATE   ADEQUATE
                                       SUBSTANCE   DESIGN    TIMING    ESTIMATE
                           90/09 MEDIUM   TOXIC      NOT       NOT
                                       SUBSTANCE   AVAIL     AVAIL
90/09 MEDIUM   WATER      NOT       NOT
                         AVAIL     AVAIL
                           90/09 MEDIUM   TOXIC      NOT       NOT
                                       SUBSTANCE   AVAIL     AVAIL
                          90/09 MEDIUM   WATER
                                                    NOT       NOT
                                                   AVAIL     AVAIL
                                              NOT
                                             AVAIL
                                                                         NOT
                                                                        AVAIL
                                              NOT
                                             AVAIL
                                              NOT
                                             AVAIL
                          90/09  HIGH    TOXIC    ADEQUATE  ADEQUATE   ADEQUATE
                                       SUBSTANCE   DESIGN    TIMING    ESTIMATE

-------
                                  FEDERAL  AGENCY  POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                          DEPARTMENT  OF  ARMY                      NATIONAL GUARD BUREAU
                 PROJECT IDENTIFICATION
                     REQ    EST    PROJECT
  BUDGET     COMPL   COMPL  COMPL  ASSESS- MEDIA
(THOUSANDS)  STATUS  DATE   DATE   MENT    TYPE
                                                                                                                      ARMY-32
                            ADEQUACY  OF  PROJECT
                          ENGIN-
                          EERING    TIME     COST
 ME-211823140 PROJECT:  GC5189S003
 CONSTRUCT SPILL CONTAINMENT  FACILITIES
 ACCT:  0 & M, NATL GUARD
 PORTLAND
 PORTLAND                        ME

 MN-2118271*0 PROJECT:  CRP089S011
 REPAIR/REPLACING UST
 ACCT:  0 & M, NATL GUARD
 CAMP RILEY
 LITTLE FALLS                    MN

 MN-211827140 PROJECT:  CRP089S012
 REPAIR/REPLACING UST
 ACCT:  0 & M,  NATL GUARD
 CAMP RILEY
 LITTLE  FALLS                    MN

 MN-2118271*0 PROJECT:  CRP089S013
 REPAIR/REPLACING  UST
 ACCT:  0  4  M,  NATL GUARD
 CAMP RILEY
 LITTLE  FALLS                     MN

 MN-2118271*0  PROJECT:  CRP089S01*
 REPAIR/REPLACING  UST
 ACCT: 0  &  M,  NATL GUARD
 CAMP RILEY
 LITTLE FALLS                     MN

MN-2118271*0  PROJECT:  CRP089S015
REPAIR/REPLACING  UST
ACCT:  0  & M, NATL GUARD
CAMP RILEY
LITTLE FALLS                     MN
       30.0  PSDF
90/09 MEDIUM   WATER
 NOT
AVAIL
                                                              NOT
                                                             AVAIL
       31.0  PSDF    91/12   91/04  MEDIUM   SOLID
                                         WASTE
       31.0   PSDF    91/12   91/0*  MEDIUM   SOLID
                                         WASTE
       31.0   PSDF    91/12   91/0* MEDIUM   SOLID
                                         WASTE
       31.0   PSDF    91/12   91/0* MEDIUM   SOLID
                                         WASTE
       31.0   PSDF    91/12   91/0* MEDIUM   SOLID
                                         WASTE
                        ADEQUATE   ADEQUATE
                         DESIGN    TIMING
                        ADEQUATE   ADEQUATE
                         DESIGN    TIMING
                        ADEQUATE   ADEQUATE
                         DESIGN    TIMING
                        ADEQUATE   ADEQUATE
                         DESIGN    TIMING
                        ADEQUATE   ADEQUATE
                         DESIGN    TIMING
 NOT
AVAIL
                    ADEQUATE
                    ESTIMATE
                    ADEQUATE
                    ESTIMATE
                    ADEQUATE
                    ESTIMATE
                    ADEQUATE
                    ESTIMATE
                    ADEQUATE
                    ESTIMATE

-------
                                 FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                         DEPARTMENT OF ARMY                      NATIONAL GUARD BUREAU
                PROJECT IDENTIFICATION
                     REQ    EST    PROJECT
  BUDGET     COMPL   COMPL  COMPL  ASSESS- MEDIA
(THOUSANDS)   STATUS  DATE    DATE   MENT    TYPE
                                                                                                                     ARMY-33
    ADEQUACY OF PROJECT
  ENGIN-
  EERING    TIME      COST
MN-211827140 PROJECT: CRP089S016
REPAIR/REPLACING UST
ACCT: 0 & M, NATL GUARD
CAMP RILEY
LITTLE FALLS                     MN

MN-211827140 PROJECT: CRP089S017
REPAIR/REPLACING UST
ACCT: 0 & M, NATL GUARD
CAMP RILEY
LITTLE FALLS                     MN

MO-211829114 PROJECT: GC2789S001
UNDERGROUND TANK REMOVAL AND CLEANUP
ACCT: 0 4 M, NATL GUARD
HQ ARMY NATN GUARD
JEFFERSON CITY                   MO

MS-211828185 PROJECT: CPC089S001
ENVIRONMENTAL DOCUMENTATION
ACCT: 0 & M, NATL GUARD
CAMP MCCAIN
GRENADA                          MS

MS-211828210 PROJECT: CPY089S001
ENVIRONMENTAL DOCUMENTATION
ACCT: 0 & M, NATL GUARD
CAMP SHELBY
HATTIESBURG                      MS

SD-211846105 PROJECT: GD4889S001
REMOVAL AND CLEAN-UP OF UST OMS-3
ACCT: MILCON, NATL GUARD
LEMMON
LEMMON                           SD
       31.0  PSDF   91/12   91/04 MEDIUM   SOLID
                                         WASTE
       31.0   PSDF    91/12   91/04 MEDIUM   SOLID
                                         WASTE
       60.0   ESDP    90/12   90/09  HIGH    SOLID
                                         WASTE
       50.0   ESDF    90/02   90/09  HIGH   MULTI
                                        MEDIA
       50.0   ESDF    90/02   90/09  HIGH   MULTI
                                        MEDIA
       15.0   ESDF
                          90/09 MEDIUM   WATER
ADEQUATE  ADEQUATE   ADEQUATE
 DESIGN    TIMING    ESTIMATE
ADEQUATE  ADEQUATE   ADEQUATE
 DESIGN    TIMING    ESTIMATE
ADEQUATE  ADEQUATE   ADEQUATE
 DESIGN    TIMING    ESTIMATE
ADEQUATE  ADEQUATE   ADEQUATE
 DESIGN    TIMING    ESTIMATE
ADEQUATE  ADEQUATE   ADEQUATE
 DESIGN    TIMING    ESTIMATE
                                                    NOT
                                                   AVAIL
            NOT
           AVAIL
 NOT
AVAIL

-------
                                  FEDERAL  AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                          DEPARTMENT OF  ARMY                      NATIONAL GUARD BUREAU
                 PROJECT IDENTIFICATION
                     REQ     EST    PROJECT
  BUDGET     COMPL    COMPL   COMPL  ASSESS- MEDIA
(THOUSANDS)   STATUS   DATE    DATE   MENT    TYPE
                                                                                                                      ARMY-34
                            ADEQUACY OF  PROJECT
                          ENGIN-
                          EERING    TIME      COST
 SD-211846150 PROJECT:  GD5189S001
 OIL/WATER SEPARATOR/CONNECT  TO  SEWER OMS-7
 ACCT:  MILCON,  NATL GUARD
 PIERRE
 PIERRE                          SD

 SD-211846150 PROJECT:  GD5189S002
 REMOVAL  AND  CLEAN-UP OF UST'S   OMS-7
 ACCT:  MILCON,  NATL GUARD
 PIERRE
 PIERRE                          SD

 50-211846175 PROJECT:  GD4989S003
 REMOVAL  AND  CLEAN-UP OF UST'S OMS-2
 ACCT:  MILCON,  NATL GUARD
 RAPID  CITY
 RAPID  CITY                       SD

 TN-211847175 PROJECT:  GD5389S001
 JOHN SEVIER  RANGE  WASH RACK PRETREATMENT
 ACCT:  MILCON,  NATL GUARD
 JOHN SEVIER
 KNOXVILLE                        TN

 TN-211847270 PROJECT:  GD5489S002
 LUST TEST PROGRAM
 ACCT:  0 & M, NATL  GUARD
 TENNESSEE ARMY NATIONAL GUARD
NASHVILLE                        TN

VA-211851170 PROJECT:  GD5589S001
REPLACING TWO UNDERGROUND TANKS
ACCT: 0 S M, NATL  GUARD
PORTSMOUTH
PORTSMOUTH                       VA
                                                        8.0  ESDP
       15.0   ESDF
                                                                           90/09  HIGH    WATER
                           90/09 MEDIUM   WATER
                                                  ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
       15.0   ESDF    91/12   90/09 MEDIUM   WATER
       50.0   ESDP
       11.0   ESDF
             ESDF
90/09  HIGH    WATER
90/09 MEDIUM   SOLID
               WASTE
                          90/09 MEDIUM   SOLID
                                         WASTE
                                                    NOT
                                                   AVAIL
                                                    NOT
                                                   AVAIL
                                    NOT
                                   AVAIL
                                    NOT
                                   AVAIL
                                                  ADEQUATE  ADEQUATE
                                                   DESIGN    TIMING
                                                  ADEQUATE  ADEQUATE
                                                   DESIGN    TIMING
                          NOT
                         AVAIL
 NOT
AVAIL
            NOT
           AVAI1
            NOT
           AVAIL
                                             ADEQUATE
                                             ESTIMATE
          ADEQUATE
          ESTIMATE
 NOT
AVAIL

-------
                                 FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR  FISCAL YEAR  1991

                         DEPARTMENT OF ARMY                      NATIONAL GUARD  BUREAU
                PROJECT IDENTIFICATION
                     REQ     EST    PROJECT
  BUDGET     COMPL   COMPL   COMPL  ASSESS- MEDIA
(THOUSANDS)   STATUS  DATE    DATE   MENT    TYPE
                                                                                                                     ARMY-35
    ADEQUACY OF PROJECT
  ENGIN-
  EERING    TIME      COST
VA-211851200 PROJECT: GD5789S001
REPLACING UNDERGROUND STORAGE TANKS
ACCT: 0 * M, NATL GUARD
RICHMOND
RICHMOND                         VA

VA-211851290 PROJECT: GD6289S001
REPLACING AN UNDERGROUND STORAGE TANK
ACCT: 0 & M, NATL GUARD
WINCHESTER
WINCHESTER                       VA

VI-211852010 PROJECT: ADW39
001-01 DRINKING WATER FILTER & CHLORINATION
ACCT: 0 & M, NATL GUARD
CHRISTENSTED GOLDENROCK
CHRISTENSTED GOLDENROCK          VI

VI-211652012 PROJECT: GD6389S001
OIL SEPARATOR-AAOF DRAIN SYSTEM
ACCT: 0 & M, NATL GUARD
CHRISTIANSTED HAMILTON
CHRISTIANSTED HAMILTON           VI

WI-211855070 PROJECT: GM1089S001
TESTING OF UNDERGROUND STORAGE TANKS
ACCT: 0 & M, NATL GUARD
EAU CLAIRE tOMS »3)
EAU CLAIRE                       WI

WI-211855070 PROJECT: GM1069S002
TESTING OF UNDERGROUND STORAGE TANKS
ACCT: 0 & M, NATL GUARD
EAU CLAIRE (OMS 93)
EAU CLAIRE                       WI
       70.0   ESDF    91/12   90/09 MEDIUM   SOLID      NOT       NOT        NOT
                                         WASTE     AVAIL     AVAIL      AVAIL
       15.0   ESDF    91/12   90/09 MEDIUM   SOLID      NOT       NOT        NOT
                                         WASTE     AVAIL     AVAIL      AVAIL
        4.0   PSDF
        6.0   PSDF
        5.0   ESDF
        5.0   ESDF
                           90/09  HIGH   DRINKING  ADEQUATE  ADEQUATE   ADEQUATE
                                         WATER     DESIGN    TIMING    ESTIMATE
                           90/09  HIGH    WATER    ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
                           90/09 MEDIUM   SOLID
                                         WASTE
                           90/09 MEDIUM   SOLID
                                         WASTE
ADEQUATE  ADEQUATE   ADEQUATE
 DESIGN    TIMING    ESTIMATE
ADEQUATE  ADEQUATE   ADEQUATE
 DESIGN    TIMING    ESTIMATE

-------
                                  FEDERAL AGENCY  POLLUTION  ABATEMENT  PLAN  FOR FISCAL YEAR 1991

                          DEPARTMENT OF ARMY                      NATIONAL GUARD BUREAU
                 PROJECT IDENTIFICATION
                     REQ    EST   PROJECT
  BUDGET     COMPL   COMPL  COMPL ASSESS-  MEDIA
(THOUSANDS)  STATUS  DATE   DATE   MENT     TYPE
                                                                     ARMY-36
                            ADEQUACY OF PROJECT
                          ENGIN-
                          EERING    TIME      COST
 WI-211S55110 PROJECT:  GM1389S001
 TESTING OF UNDERGROUND STORAGE  TANKS
 ACCT: 0 & M, NATL GUARD
 HAYWARD (QMS 812)
 HAYWARD                          HI

 WI-211855120 PROJECT:  GM1189S001
 TESTING OF UNDERGROUND STORAGE  TANKS
 ACCT: 0 & M, NATL GUARD
 JANESVILLE (OMS  88)
 JANESVILLE                       HI

 WI-211855120 PROJECT:  GM1189S002
 TESTING OF UNDERGROUND STORAGE  TANKS
 ACCT:  0 « M,  NATL GUARD
 JANESVILLE (OMS  88)
 JANESVILLE                       HI

 WI-211855125  PROJECT:  GM2089S001
 TESTING  OF UNDERGROUND STORAGE  TANKS
 ACCT:  0  &  M,  NATL GUARD
 KENOSHA  (OMS  961
 KENOSHA                           HI

 WI-211855125  PROJECT:  GM20S9S002
 TESTING OF  UNDERGROUND  STORAGE  TANKS
 ACCT:  0  &  M,  NATL  GUARD
 KENOSHA  (OMS  86)
 KENOSHA                           WI

WI-211855130  PROJECT:  GM1289S001
TESTING OF  UNDERGROUND  STORAGE  TANKS
ACCT:  0 & M,  NATL  GUARD
MADISON (OMS  *9)
MADISON                          WI
                                                        5.0   ESDF
        5.0  ESDF
        5.0   ESDF
        5.0   ESDF
       5.0   ESDF
       5.0   ESDF
                           90/09 MEDIUM    SOLID
                                          WASTE
                           90/09  MEDIUM   SOLID
                                         WASTE
                           90/09 MEDIUM   SOLID
                                         WASTE
                           90/09 MEDIUM   SOLID
                                         WASTE
                           90/09 MEDIUM   SOLID
                                         WASTE
90/09 MEDIUM   SOLID
               WASTE
                        ADEQUATE  ADEQUATE   ADEQUATE
                         DESIGN    TIMING    ESTIMATE
                        ADEQUATE  ADEQUATE   ADEQUATE
                         DESIGN    TIMING    ESTIMATE
                        ADEQUATE  ADEQUATE   ADEQUATE
                         DESIGN    TIMING    ESTIMATE
                        ADEQUATE  ADEQUATE   ADEQUATE
                         DESIGN    TIMING    ESTIMATE
                        ADEQUATE  ADEQUATE   ADEQUATE
                         DESIGN    TIMING    ESTIMATE
                                                  ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE

-------
                                 FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                         DEPARTMENT OF ARMY                      NATIONAL GUARD BUREAU
                PROJECT IDENTIFICATION
                     REQ    EST    PROJECT
  BUDGET     COMPL   COMPL  COMPL  ASSESS- MEDIA
(THOUSANDS)  STATUS  DATE    DATE   MENT    TYPE
                                                                                                                     ARMY-37
                            ADEQUACY  OF  PROJECT
                          ENGIN-
                          EERING    TIME     COST
WI-211655130 PROJECT: GM1289S002
TESTING OF UNDERGROUND STORAGE TANKS
ACCT: 0 t M, NATL GUARD
MADISON (OMS 89)
MADISON                          WI

WI-211855145 PROJECT: GM2589S001
TESTING OF UNDERGROUND STORAGE TANKS
ACCT: 0 « M, NATL GUARD
MADISON (AATF 81)
MADISON                          WI

WI-211855145 PROJECT: GM2589S002
TESTING OF UNDERGROUND STORAGE TANKS
ACCT: 0 4 M, NATL GUARD
MADISON (AATF 81)
MADISON                          WI

WI-211855145 PROJECT: GM2589S003
TESTING OF UNDERGROUND STORAGE TANKS
ACCT: 0 t M, NATL GUARD
MADISON (AATF 81)
MADISON                          WI

WI-211855145 PROJECT: GM2589SOO*
TESTING OF UNDERGROUND STORAGE TANKS
ACCT: 0 4 M, NATL GUARD
MADISON (AATF 81)
MADISON                          WI

WI-211855190 PROJECT: GM0989S001
TESTING OF UNDERGROUND STORAGE TANKS
ACCT: 0 i M, NATL GUARD
MILWAUKEE
MILWAUKEE                        WI
        5.0  ESDF
        5.0  ESDF
        5.0   ESDF
        5.0   ESDF
        5.0   ESDF
        5.0   ESDF
                           90/09  MEDIUM   SOLID
                                         WASTE
90/09 MEDIUM   SOLID
               WASTE
90/09 MEDIUM   SOLID
               WASTE
90/09 MEDIUM   SOLID
               WASTE
90/09 MEDIUM   SOLID
               WASTE
90/09 MEDIUM   SOLID
               WASTE
                        ADEQUATE   ADEQUATE   ADEQUATE
                         DESIGN    TIMING    ESTIMATE
ADEQUATE  ADEQUATE   ADEQUATE
 DESIGN    TIMING    ESTIMATE
                                                  ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
ADEQUATE  ADEQUATE   ADEQUATE
 DESIGN    TIMING    ESTIMATE
                                                  ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
                                                  ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE

-------
                                  FEDERAL  AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                          DEPARTMENT OF  ARMY                      NATIONAL GUARD BUREAU
                 PROJECT IDENTIFICATION
                     REQ     EST    PROJECT
  BUDGET     COMPL    COMPL   COMPL  ASSESS- MEDIA
(THOUSANDS)   STATUS   DATE    DATE   MENT    TYPE
                                                                                                                      ARMY-38
                            ADEQUACY OF PROJECT
                          ENGIN-
                          EERING    TIME      COST
 WI-211855190 PROJECT:  GM0989S002
 TESTING OF UNDERGROUND STORAGE  TANKS
 ACCT:  0 & M, NATL GUARD
 MILWAUKEE
 MILWAUKEE                       WI

 WI-211855225 PROJECT:  GM1989S001
 TESTING OF UNDERGROUND STORAGE  TANKS
 ACCT:  0 & M, NATL GUARD
 OCONOMOWOC
 OCONOMOWOC                      WI

 WI-211855225 PROJECT:  GM1989S002
 TESTING OF UNDERGROUND STORAGE  TANKS
 ACCT:  0 J,  M,  NATL GUARD
 OCONOMOWOC
 OCONOMOWOC                      WI

 WI-211855235  PROJECT:  GM1689S001
 TESTING OF UNDERGROUND  STORAGE  TANKS
 ACCT:  0 &  M,  NATL GUARD
 ONALASKA  (CMS »2)
 ONALASKA                         WI

 WI-211855235  PROJECT:  GM1689SOOZ
 TESTING OF  UNDERGROUND  STORAGE  TANKS
 ACCT:  0  &  M,  NATL  GUARD
 ONALASKA  (OMS 82)
 ONALASKA                         WI

 WI-211855245  PROJECT: GM1889S001
 TESTING OF  UNDERGROUND  STORAGE  TANKS
ACCT: 0 &  M, NATL GUARD
OSHKOSH  (OMS »10)
OSHKOSH                          WI
                                                        5.0  ESDF
        5.0   ESDF
        5.0   ESDF
        5.0   ESDF
        5.0   ESDF
       5.0   ESDF
                           90/09 MEDIUM   SOLID
                                         WASTE
                          90/09 MEDIUM   SOLID
                                         WASTE
                           90/09 MEDIUM   SOLID
                                         WASTE
                          90/09 MEDIUM   SOLID
                                         WASTE
90/09 MEDIUM   SOLID
               WASTE
                          90/09 MEDIUM   SOLID
                                         WASTE
                        ADEQUATE  ADEQUATE    ADEQUATE
                         DESIGN    TIMING    ESTIMATE
                        ADEQUATE  ADEQUATE    ADEQUATE
                         DESIGN    TIMING    ESTIMATE
                        ADEQUATE  ADEQUATE    ADEQUATE
                         DESIGN    TIMING    ESTIMATE
                        ADEQUATE  ADEQUATE    ADEQUATE
                         DESIGN    TIMING    ESTIMATE
                                                  ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
                        ADEQUATE  ADEQUATE   ADEQUATE
                         DESIGN    TIMING    ESTIMATE

-------
                                  FEDERAL ASENCY  POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                          DEPARTMENT  OF ARMY                      NATIONAL GUARD BUREAU
                 PROJECT  IDENTIFICATION
                     REQ    EST   PROJECT
  BUDGET     COMPL   COMPL   COMPL  ASSESS- MEDIA
(THOUSANDS)   STATUS  DATE    DATE   MENT    TYPE
                                                                                                                      ARMY-39
                            ADEQUACY OF  PROJECT
                          ENGIN-
                          EERING    TIME      COST
WI-211855245  PROJECT: GM1889S002
TESTING OF UNDERGROUND STORAGE TANKS
ACCT: 0 t M,  NATL GUARD
OSHKOSH (OMS  810)
OSHKOSH                          HI

WI-211855320  PROJECT: GM1789S001
TESTING OF UNDERGROUND STORAGE TANKS
ACCT: 0 & M,  NATL GUARD
FORT MCCOY
SPARTA                           HI

WI-211855320  PROJECT: GM1789S002
TESTING OF UNDERGROUND STORAGE TANKS
ACCT: 0 & M,  NATL GUARD
FORT MCCOY
SPARTA                           WI

WI-211855320  PROJECT: GM1789S003
TESTING OF UNDERGROUND STORAGE TANKS
ACCT: 0 & M,  NATL GUARD
FORT MCCOY
SPARTA                           WI

WI-211855345  PROJECT: GM2
-------
                                  FEDERAL AGENCY  POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                          DEPARTMENT OF  ARMY                      NATIONAL GUARD BUREAU
                 PROJECT IDENTIFICATION
                     REQ     EST    PROJECT
  BUDGET     COMPL    COMPL   COMPL  ASSESS- MEDIA
(THOUSANDS)   STATUS   DATE    DATE   MENT    TYPE
                                                                     ARMY-40
                            ADEQUACY OF PROJECT
                          ENGIN-
                          EERING    TIME      COST
 WI-211855345 PROJECT:  GM2489S006
 TESTING OF UNDERGROUND STORAGE  TANKS
 ACCT:  0 « M, NATL GUARD
 CAMP WILLIAMS
 TOMAH                           HI

 WI-211855345 PROJECT:  6M2489S007
 TESTING OF UNDERGROUND STORAGE  TANKS
 ACCT:  0 4 M, NATL GUARD
 CAMP WILLIAMS
 TOMAH                            HI

 WI-211855345 PROJECT:  GM2489S006
 TESTING OF UNDERGROUND  STORAGE  TANKS
 ACCT:  0 & M,  NATL GUARD
 CAMP WILLIAMS
 TOMAH                            WI

 WI-211855380  PROJECT:  6M0889S001
 WOLTZ-KRAUSE  LANDFILL  CLEANUP
 ACCT: DERA -  DMA  (OPERATIONS AND MA
 WAUSAU  (OMS *13)
 WAUSAU                           HI

 WI-211855380  PROJECT: GM0889S002
 TESTING OF  UNDERGROUND  STORAGE TANKS
 ACCT: 0 &  M,  NATL GUARD
 WAUSAU  (OMS 813)
 WAUSAU                           WI

 WI-211855380  PROJECT: GM0889S003
 TESTING OF UNDERGROUND STORAGE TANKS
ACCT: 0 4  M, NATL GUARD
WAUSAU (OMS 813)
WAUSAU                           WI
                                                        5.0  ESDF
        5.0   ESDF
        5.0   ESDF
       20.0   ESDP
       5.0  1SDF
       5.0  ESDF
                           90/09 MEDIUM   SOLID    ADEQUATE  ADEQUATE   ADEQUATE
                                         WASTE     DESIGN    TIMING    ESTIMATE
                           90/09 MEDIUM   SOLID    ADEQUATE  ADEQUATE   ADEQUATE
                                         WASTE     DESIGN    TIMING    ESTIMATE
                           90/09 MEDIUM   SOLID    ADEQUATE  ADEQUATE   ADEQUATE
                                         WASTE     DESIGN    TIMING    ESTIMATE
                          90/09  HIGH    CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
90/09 MEDIUM   SOLID
               WASTE
                          90/09 MEDIUM   SOLID
                                         WASTE
                                                  ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
                        ADEQUATE  ADEQUATE   ADEQUATE
                         DESIGN    TIMING    ESTIMATE

-------
                                 FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                         DEPARTMENT OF ARMY                      NATIONAL GUARD BUREAU
                PROJECT IDENTIFICATION
                     REQ    EST   PROJECT
  BUDGET     COMPL   COMPL  COMPL ASSESS- MEDIA
(THOUSANDS)  STATUS  DATE   DATE   MENT    TYPE
                                                                                                                      ARMY-41
                            ADEQUACY OF PROJECT
                          ENGIN-
                          EERING    TIME      COST
WI-211855390 PROJECT: GM1489S001
TESTING OF UNDERGROUND STORAGE TANKS
ACCT: 0 t M, NATL GUARD
WEST BEND (AASF #1)
WEST BEND                        MI

WI-211855390 PROJECT: GM1489S002
TESTING OF UNDERGROUND STORAGE TANKS
ACCT: 0 4 M, NATL GUARD
WEST BEND (AASF 91)
WEST BEND                        WI

WI-211855390 PROJECT: GM1489S003
TESTING OF UNDERGROUND STORAGE TANKS
ACCT: 0 4 M, NATL GUARD
WEST BEND (AASF SI)
WEST BEND                        WI

WI-211855405 PROJECT: GM1589S001
TESTING OF UNDERGROUND STORAGE TANKS
ACCT: 0 4 M, NATL GUARD
WESTR BEND (OMS 814)
WISCONSIN RAPIDS                 WI

WV-211854100 PROJECT: GM0589S001
CONNECT MORGANTOWN ARMORY TO PUBLIC SEWAGE
ACCT: 0 4 M, NATL GUARD
MORGANTOWN
MORGANTOWN                       WV

WV-211854155 PROJECT: GM0789S001
SALEM ARMORY PACKAGE PLANT UPGRADE
ACCT: 0 4 M, NATL GUARD
SALEM
SALEM                            WV
        5.0  ESDF
        5.0   ESDF
        5.0   ESDF
        5.0   ESDF
       20.0   ESDL
                           90/09 MEDIUM    SOLID
                                          WASTE
90/09 MEDIUM   SOLID
               WASTE
90/09 MEDIUM   SOLID
               WASTE
90/09 MEDIUM   SOLID
               WASTE
91/0* MEDIUM   WATER
       50.0   ESDP   88/09   91/06  HIGH    WATER
                        ADEQUATE  ADEQUATE    ADEQUATE
                         DESIGN    TIMING    ESTIMATE
                                                  ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
ADEQUATE  ADEQUATE   ADEQUATE
 DESIGN    TIMING    ESTIMATE
ADEQUATE  ADEQUATE   ADEQUATE
 DESIGN    TIMING    ESTIMATE
                                                  ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
                        ADEQUATE  ADEQUATE   ADEQUATE
                         DESIGN    TIMING    ESTIMATE

-------
                           FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR  FISCAL  YEAR  1991                         ARMY-42

                   DEPARTMENT OF ARMY                      NATIONAL GUARD  BUREAU

                                                               RE<3   EST    PROJECT             ADEQUACY OF PROJECT
          PROJECT IDENTIFICATION            BUDGET     COMPL    COMPL COMPL  ASSESS- MEDIA      ENGIN-
                                          tTHOUSANDS)   STATUS  DATE  DATE  MENT    TYPE       EERIN6    TIME      COST


TOTAL, NATIONAL GUARD BUREAU                             6,290.0                      144

-------
                                 FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR  1991

                         DEPARTMENT OF ARMY                      MILITARY TRAFFIC MGMT  COM
                PROJECT IDENTIFICATION
                     REQ    EST    PROJECT
  BUDGET     COMPL   COMPL   COMPL  ASSESS- MEDIA
(THOUSANDS)   STATUS  DATE    DATE   MENT    TYPE
                                                                                                                     ARMY-43
                            ADEQUACY OF  PROJECT
                          ENGIN-
                          EERING    TIME      COST
NJ-213522752 PROJECT: 8804
REMEDIAL INVESTIGATION/FACILITY ASSESSMENT
ACCT: DERA - DMA (OPERATIONS AND MA
MILITARY OCEAN TML BAYONNE
BAYONNE                          NJ

NJ-213522752 PROJECT: BY0089S003
REMOVE UNDERGROUND STORAGE TANK
ACCT: DMA OPERATIONS & MAINT.ARMY
MILITARY OCEAN TML BAYONNE
BAYONNE                          NJ

NJ-213522752 PROJECT: BY0089S002
REMOVE ASBESTOS FROM BASEMENTS GBV
ACCT: DMA OPERATIONS & MAINT.ARMY
MILITARY OCEAN TML BAYONNE
BAYONNE                          NJ

NJ-213522752 PROJECT: BY0089S001
REPLACE DETERIORATED PCB TRANSFORMERS
ACCT: DMA OPERATIONS « MAINT.ARMY
MILITARY OCEAN TML BAYONNE
BAYONNE                          NJ
       50.0  ESDF   92/11   90/09  HIGH    CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
      467.0   ESRO
        1.0  OTHR
      250.0  PSDF
91/04 MEDIUM   CERCLA   ADEQUATE   ADEQUATE   ADEQUATE
                         DESIGN    TIMING    ESTIMATE
91/03 MEDIUM   TOXIC    ADEQUATE   ADEQUATE   ADEQUATE
             SUBSTANCE    DESIGN    TIMING    ESTIMATE
90/09  HIGH
                                         MATER
                                                  ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
      TOTAL, MILITARY TRAFFIC MGMT COM
                 768.0

-------
                                  FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                          DEPARTMENT  OF ARMY                      USA TRAINING ft DOCTRINE COM
                 PROJECT IDENTIFICATION
                     REQ    EST    PROJECT
  BUDGET     COMPL   COMPL  COMPL  ASSESS- MEDIA
(THOUSANDS)   STATUS  DATE    DATE   MENT    TYPE
              ADEQUACY OF PROJECT
            ENGIN-
            EERING    TIME      COST
 AL-213720562 PROJECT:  MCC-89-S32
 RADON TESTING AT RESERVE  CENTERS
 ACCT:  MILCON,  ARMY  RSV(MCAR)
 FORT MCCLELLAN
 FORT MCCLELLAN                  AL

 AL-213720562 PROJECT:  MCC-89-S24
 RADON REMEDIATION
 ACCT:  OMA  OPERATIONS ft MAINT,ARMY
 FORT MCCLELLAN
 FORT MCCLELLAN                  AL

 AL-213720562 PROJECT:  MCC-89-S16
 DREDGE REILLY  LAKE
 ACCT:  OMA  OPERATIONS ft MAINT.ARMY
 FORT MCCLELLAN
 FORT MCCLELLAN                  AL

 AL-213720562 PROJECT:  MCC-89-S20
 TANK TRAINING  TRAILS
 ACCT: OMA  OPERATIONS ft MAINT.ARMY
 FORT MCCLELLAN
 FORT MCCLELLAN                  AL

 AL-213720562 PROJECT: MCC-89-S5
 TANK TRAIL RECLAMATION
 ACCT: OMA OPERATIONS ft MAINT.ARMY
 FORT MCCLELLAN
 FORT MCCLELLAN                   AL

AL-213720562 PROJECT: MCC-89-521
CHEMICAL ANALYSIS
ACCT: OMA OPERATIONS & MAINT.ARMY
FORT MCCLELLAN
FORT MCCLELLAN                   AL
                                                        5.0  ESDF   91/12  90/09 MEDIUM    AIR
       10.0   ESDF   92/09   90/09 MEDIUM    AIR
        3.0   ESRO   69/12   90/09   LOW
       20.0   OTHR    90/09   90/09   LOW
LAND
MGMT
LAND
MGMT
       5.0   OTHR    90/06  90/09   LOW    LAND
                                        MGMT
       20.0   ESDP   S9/05  90/09  HIGH   MULTI
                                        MEDIA
                                                  ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
                                                  ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
                                                  ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
ADEQUATE  ADEQUATE     NOT
 DESIGN    TIMING     AVAIL
          ADEQUATE  ADEQUATE   ADEQUATE
           DESIGN    TIMING    ESTIMATE
          ADEQUATE  ADEQUATE   ADEQUATE
           DESIGN    TIMING    ESTIMATE

-------
                                 FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                         DEPARTMENT OF ARMY                      USA TRAINING t DOCTRINE COM
                PROJECT IDENTIFICATION
                     REQ    EST   PROJECT
  BUDGET     COMPL   COMPL  COMPL ASSESS- MEDIA
(THOUSANDS)   STATUS  DATE   DATE   MENT    TYPE
                                                                                                                     ARMY-45
             ADEQUACY OF PROJECT
           ENGIN-
           EERING    TIME      COST
AL-213720562 PROJECT: MCC-89-S43
TRAINING
ACCT: DMA OPERATIONS t MAINT.ARMY
FORT MCCLELLAN
FORT MCCLELLAN                   AL

AL-213720562 PROJECT: MCC-89-S22
TECHNICAL MANYEAR
ACCT: DMA OPERATIONS ft MAINT.ARMY
FORT MCCLELLAN
FORT MCCLELLAN                   AL

AL-213720562 PROJECT: MCC-89-S23
CLERICAL MANYEARS
ACCT: OMA OPERATIONS & MAINT.ARMY
FORT MCCLELLAN
FORT MCCLELLAN                   AL

AL-213720562 PROJECT: MCC-89-S3
RETROFIT/REMEDIATE UST
ACCT: OMA OPERATIONS t MAINT.ARMY
FORT MCCLELLAN
FORT MCCLELLAN                   AL

AL-213720562 PROJECT: MCC-89-S4
HAZARDOUS WASTE DISPOSAL
ACCT: OMA OPERATIONS & MAINT.ARMY
FORT MCCLELLAN
FORT MCCLELLAN                   AL

AL-213720562 PROJECT: MCC-89-S9
SOLVENT RECYCLING
ACCT: OMA OPERATIONS ft MAINT.ARMY
FORT MCCLELLAN
FORT MCCLELLAN                   AL
       10.0  ESDF   94/09  90/09 MEDIUM  MULTI
                                        MEDIA
       18,0   OTHR   89/10   90/09  MEDIUM  MULTI
                                        MEDIA
       15.0   OTHR   89/09  90/09  MEDIUM  MULTI
                                        MEDIA
       50.0   CMPA   98/12   90/09  HIGH    SOLID
                                         HASTE
       90.0   ESDP   89/10   90/09  HIGH
       26.0   ESDP   89/05   90/09  HIGH
                                         SOLID
                                         WASTE
SOLID
WASTE
         ADEQUATE  ADEQUATE   ADEQUATE
          DESIGN    TIMING    ESTIMATE
         ADEQUATE  ADEQUATE   ADEQUATE
          DESIGN    TIMING    ESTIMATE
         ADEQUATE  ADEQUATE   ADEQUATE
          DESIGN    TIMING    ESTIMATE
         ADEQUATE  ADEQUATE   ADEQUATE
          DESIGN    TIMING    ESTIMATE
         ADEQUATE  ADEQUATE    ADEQUATE
          DESIGN    TIMING    ESTIMATE
ADEQUATE  ADEQUATE   ADEQUATE
 DESIGN    TIMING    ESTIMATE

-------
                                  FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                          DEPARTMENT OF ARMY                      USA TRAINING 4 DOCTRINE COM
                 PROJECT IDENTIFICATION
                     REQ     EST   PROJECT
  BUDGET     COMPL   COMPL   COMPL ASSESS- MEDIA
(THOUSANDS)   STATUS   DATE    DATE  MENT    TYPE
                                                                                                                     ARMY-46
    ADEQUACY OF PROJECT
  ENGIN-
  EERING    TIME      COST
 AL-213720562 PROJECT:  MCC-69-S10
 WASTE OIL RECYCLING
 ACCT: DMA OPERATIONS t MAINT,ARMY
 FORT MCCLELLAN
 FORT MCCLELLAN                  AL

 AL-213720562 PROJECT:  MCC-89-S12
 CLOSE SANITARY LANDFILL
 ACCT: DMA OPERATIONS & MAINT.ARMY
 FORT MCCLELLAN
 FORT MCCLELLAN                  AL

 AL-213720562 PROJECT:  TD 88-003
 PCS  COMPLIANCE
 ACCT:  DMA OPERATIONS & MAINT.ARMY
 FORT MCCLELLAN
 FORT MCCLELLAN                   AL

 AL-213720562  PROJECT:  MCC-89-S39
 CONSTRUCT SANITARY  LANDFILL
 ACCT:  MILCON.ARMY (MCA)
 FORT MCCLELLAN
 FORT MCCLELLAN                   AL

 AL-213720562  PROJECT:  MCC-89-S15
 SOLID  WASTE  RECYCLING
 ACCT:  DMA  OPERATIONS t MAINT.ARMY
 FORT MCCLELLAN
 FORT MCCLELLAN                   AL

AL-213720562  PROJECT: TD 88-001
SOLVENT RECYCLING
ACCT: OMA OPERATIONS t MAINT.ARMY
FORT MCCLELLAN
FORT MCCLELLAN                   AL
      125.0   ESDP   94/09  90/09  HIGH    SOLID
                                         WASTE
      400.0   ESDF    92/03   90/09 MEDIUM   SOLID
                                         WASTE
ADEQUATE  ADEQUATE   ADEQUATE
 DESIGN    TIMING    ESTIMATE
        5.0   ESDF
                           90/09 MEDIUM   SOLID
                                         WASTE
      225.0   ESDF    91/09  90/09 MEDIUM   SOLID
                                         WASTE
        3.0   PSDF    90/10   90/09 MEDIUM   SOLID
                                         WASTE
       50.0   ESDL
                          90/09  LOW     SOLID
                                         WASTE
ADEQUATE  ADEQUATE
 DESIGN    TIMING
ADEQUATE  ADEQUATE
 DESIGN    TIMING
  NOT
 AVAIL
  NOT
 AVAIL
 NOT
AVAIL
 NOT
AVAIL
ADEQUATE  ADEQUATE
 DESIGN    TIMING
          ADEQUATE
          ESTIMATE
          ADEQUATE
          ESTIMATE
 NOT
AVAIL
 NOT
AVAIL
          ADEQUATE
          ESTIMATE

-------
                                 FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                         DEPARTMENT OF ARMY                      USA TRAINING ft DOCTRINE COM
                PROJECT IDENTIFICATION
                     REQ    EST   PROJECT
  BUDGET     COMPL   COMPL  COMPL ASSESS- MEDIA
(THOUSANDS)  STATUS  DATE   DATE   MENT    TYPE
                                                                                                                     ARMY-47
                            ADEQUACY OF  PROJECT
                          ENGIN-
                          EERING    TIME      COST
AL-213720562 PROJECT: TD-88-008
WASTE OIL RECOVERY
ACCT: DMA OPERATIONS t MAINT.ARMY
FORT MCCLELLAN
FORT MCCLELLAN                   AL

AL-213720562 PROJECT: MCC-89-S6
PCB REMOVAL/REPLACEMENT
ACCT: OMA OPERATIONS ft MAINT.ARMY
FORT MCCLELLAN
FORT MCCLELLAN                   AL

AL-213720562 PROJECT: MCC-89-S25
ASBESTOS REMEDIATION
ACCT: OMA OPERATIONS ft MAINT.ARMY
FORT MCCLELLAN
FORT MCCLELLAN                   AL
      100.0  ESDL
90/09  LOW     SOLID    ADEQUATE  ADEQUATE    ADEQUATE
               WASTE     DESIGN    TIMING    ESTIMATE
       25.0  ESDF   92/09  90/09  LOW     TOXIC     ADEQUATE  ADEQUATE   ADEQUATE
                                        SUBSTANCE   DESIGN    TIMING    ESTIMATE
       50.0  ESDF   9
-------
                                  FEDERAL AGENCY  POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                          DEPARTMENT OF  ARMY                      USA TRAINING t DOCTRINE COM
                 PROJECT IDENTIFICATION
                     REQ     EST   PROJECT
  BUDGET     COMPL   COMPL   COMPL ASSESS- MEDIA
(THOUSANDS>   STATUS   DATE    DATE  MENT    TYPE
                                                                     ARMY-48
                            ADEQUACY OF  PROJECT
                          ENGIN-
                          EERING    TIME      COST
 AL-213720562 PROJECT:  TD  88-007
 TRAINING REGULATION COMPLIANCE
 ACCT:  OMA OPERATIONS & MAINT.ARMY
 FORT MCCLELLAN
 FORT MCCLELLAN                  AL

 AL-213720562 PROJECT:  TD-88-010
 PROPERTY RECLAMATION
 ACCT:  OMA OPERATIONS & MAINT.ARMY
 F03T MCCLELLAN
 FORT MCCLELLAN                  AL

 AL-213720776 PROJECT:  RUC-89-S5
 MASTER  PLAN/COMPONENT  PLANS EIS
 ACCT: OMA  OPERATIONS 4 MAINT.ARMY
 FORT RUCKER
 FORT RUCKER                      AL

 AL-213720776  PROJECT:  RU-SF-1
 INSTALLATION  RESTORATION RI/FS & RA
 ACCT: DERA
 FORT RUCKER
 FORT RUCKER                      AL

 AR-213720187  PROJECT:  CHA-TS-14
 ASBESTOS ABATEMENT EXPENDABLE SUPPLIES
 ACCT: OMA OPERATIONS & MAINT,ARMY
 FORT CHAFFEE
 FORT CHAFFEE                     AR

AR-213720187  PROJECT:  CHA-TS-13
ASBESTOS ABATEMENT DESIGN AND REMOVAL
ACCT: OMA OPERATIONS & MAINT.ARMY
FORT CHAFFEE
FORT CHAFFEE                     AR
        5.0   OTHR    88/05   90/09  HIGH    WATER    ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
       30.0   OTHR
      180.0   ESDP
      600.0   ESDF
       25.0  INOV
     500.0  INOV
                          90/09  LOW     WATER    ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
                          90/10  HIGH   MULTI     ADEQUATE  ADEQUATE   ADEQUATE
                                        MEDIA      DESIGN    TIMING    ESTIMATE
                          90/09  HIGH    CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
90/09  HIGH     AIR     ADEQUATE  ADEQUATE    ADEQUATE
                         DESIGN    TIMING    ESTIMATE
90/09  HIGH     AIR
                                                   UNDER    ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE

-------
                                  FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                         DEPARTMENT OF ARMY                      USA TRAINING ft DOCTRINE COM
                PROJECT IDENTIFICATION
                     REQ    EST   PROJECT
  BUDGET     COMPL   COMPL  COMPL ASSESS-  MEDIA
(THOUSANDS)  STATUS  DATE   DATE   MENT     TYPE
                                                                     ARMY-49
                            ADEQUACY OF PROJECT
                          ENGIN-
                          EERING    TIME      COST
AR-213720187 PROJECT: CHA-S9-S16
ARCHEOLOGICAL MITIGATION
ACCT: DMA OPERATIONS ft MAINT.ARMY
FORT CHAFFEE
FORT CHAFFEE                     AR

AR-213720187 PROJECT: CHA-89-S17
PHASE 2 ARCHEOLOGICAL SURVEY
ACCT: DMA OPERATIONS ft MAINT.ARMY
FORT CHAFFEE
FORT CHAFFEE                     AR

AR-213720187 PROJECT: CHA-89-S19
INTEGRATED TRAINING AREA MANAGEMENT PROGRAM
ACCT: OMA OPERATIONS ft MAINT.ARMY
FORT CHAFFEE
FORT CHAFFEE                     AR

AR-213720187 PROJECT: CHA-MM-3
ENVIRONMENTAL TRAINING
ACCT: OMA OPERATIONS & MAINT.ARMY
FORT CHAFFEE
FORT CHAFFEE                     AR

AR-213720187 PROJECT: CHA-89-S22
UNDERGROUND STORAGE TANK REMOVAL
ACCT: DERA
FORT CHAFFEE
FORT CHAFFEE                     AR

AR-213720187 PROJECT: CHA-SW-11
HAZARDOUS WASTE ANALYSIS
ACCT: OMA OPERATIONS ft MAINT.ARMY
FORT CHAFFEE
FORT CHAFFEE                     AR
       25.0  ESDL
       50.0  ESOL
       25.0   ESDL
       15.0   OTHR
      146.0   ESDF
       20.0  ESDF
                           90/09  LOW
                           90/09   LOW
                                        HIST/
                                        ARCH
                                        HIST/
                                        ARCH
90/09  LOW    LAND
              MGMT
                        ADEQUATE  ADEQUATE   ADEQUATE
                         DESIGN    TIMING    ESTIMATE
                        ADEQUATE  ADEQUATE   ADEQUATE
                         DESIGN    TIMING    ESTIMATE
                                                  ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
                           90/09   LOW    MULTI     ADEQUATE .ADEQUATE   ADEQUATE
                                        MEDIA      DESIGN    TIMING    ESTIMATE
                          90/09 MEDIUM   CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
90/09 MEDIUM   SOLID    ADEQUATE   ADEQUATE   ADEQUATE
               WASTE     DESIGN   TIMING    ESTIMATE

-------
                                  FEDERAL AGENCY  POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                          DEPARTMENT OF  ARMY                      USA TRAINING & DOCTRINE COM
                 PROJECT IDENTIFICATION
                     REQ     EST   PROJECT
  BUDGET     COMPL    COMPL   COMPL ASSESS- MEDIA
(THOUSANDS)   STATUS   DATE    DATE  MENT    TYPE
                                                                                                                      ARMY-50
  ADEQUACY OF PROJECT
ENGIN-
EERING    TIME      COST
 AR-213720187 PROJECT:  CHA-89-S20
 HAZARDOUS WASTE HANDLERS TRAINING
 ACCT:  OMA OPERATIONS * MAINT,ARMY
 FORT CHAFFEE
 FORT CHAFFEE                    AR

 AR-213720187 PROJECT:  CHA-SW-10
 HAZARDOUS MATERIALS  AND SPILL  SUPPLIES
 ACCT:  OMA OPERATIONS & MAINT.ARMY
 FORT CHAFFEE
 FORT CHAFFEE                    AR

 AR-213720137 PROJECT:  CHA-TS-15
 ASBESTOS  AIR AND BULK  SAMPLE ANALYSIS
 ACCT:  OMA OPERATIONS &  MAINT,ARMY
 FORT CHAFFEE
 FORT CHAFFEE                    AR

 AR-213720187 PROJECT: CHA-89-S21
 ASBESTOS  ABATEMENT WORKER TRAINING
 ACCT:  OMA  OPERATIONS &  MAINT,ARMY
 FORT CHAFFEE
 FORT CHAFFEE                     AR

 AR-213720187  PROJECT: CHA-W-4
 CLEANING UP  FIRE TRAINING PIT
 ACCT:  DERA
 FORT CHAFFEE
 FORT CHAFFEE                     AR

 GA-213720084  PROJECT: BEN-89-S12
HISTORIC MAINTENANCE PLAN
ACCT: OMA OPERATIONS & MAINT.ARMY
 FORT BENNING
FORT BENNING                     GA
                                                       15.0  ESDL
       10.0   OTHR
       15.0   ESDF
       15.0   ESDL
                           90/09  LOW     SOLID    ADEQUATE  ADEQUATE   ADEQUATE
                                         WASTE     DESIGN    TIMING    ESTIMATE
                           90/09  LOW     SOLID    ADEQUATE  ADEQUATE   ADEQUATE
                                         WASTE     DESIGN    TIMING    ESTIMATE
                           90/09 MEDIUM   TOXIC    ADEQUATE  ADEQUATE   ADEQUATE
                                       SUBSTANCE   DESIGN    TIMING    ESTIMATE
                          90/09  LOW     TOXIC    ADEQUATE  ADEQUATE   ADEQUATE
                                       SUBSTANCE   DESIGN    TIMING    ESTIMATE
       30.0   ESDF   91/10  90/09 MEDIUM   WATER    ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
            ESDF
                          93/09 MEDIUM  HIST/     ADEQUATE  ADEQUATE   ADEQUATE
                                        ARCH       DESIGN    TIMING    ESTIMATE

-------
                                 FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                         DEPARTMENT OF ARMY                      USA TRAINING ( DOCTRINE COM
                PROJECT IDENTIFICATION
                     REQ    EST   PROJECT
  BUDGET     COMPL   COMPL  COMPL ASSESS-  MEDIA
(THOUSANDS)  STATUS  DATE   DATE   MENT     TYPE
                                                                                                                      ARMY-51
                            ADEQUACY OF PROJECT
                          ENGIN-
                          EERING    TIME      COST
GA-213720084 PROJECT: BEN-89-S10
MISCELLANEOUS ARCHEOLOGICAL SURVEYS
ACCT: OfIA OPERATIONS t MAINT.ARMY
FORT BENNING
FORT BENNING                     GA

GA-213720084 PROJECT: BEN-89-S9
ARCHEOLOGICAL FORESTRY SURVEYS
ACCT: OMA OPERATIONS & MAINT.ARMY
FORT BENNING
FORT BENNING                     GA

GA-213720084 PROJECT: BEN-89-S6
LEAK TEST OF STORAGE TANKS
ACCT: OMA OPERATIONS & MAINT.ARMY
FORT BENNING
FORT BENNING                     GA

GA-213720084 PROJECT: BEN-89-S7
SITE ASSESSMENTS - LUST
ACCT: OMA OPERATIONS ft MAINT.ARMY
FORT BENNING
FORT BENNING                     GA

GA-213720084 PROJECT: BEN-89-S19
REMEDIAL ACTION - LUST
ACCT: DERA
FORT BENNING
FORT BENNING                     GA

GA-213720084 PROJECT: BEN-89-S5
HAZARDOUS WASTE ANALYSIS
ACCT: OMA OPERATIONS 4 MAINT.ARMY
FORT BENNING
FORT BENNING                     GA
       50.0  OTHR
       80.0  OTHR
       40.0  ESDF
      150.0  ESDF
      300.0   ESDF
       30.0   OTHR
90/09  LOW    HIST/     ADEQUATE  ADEQUATE   ADEQUATE
              ARCH       DESIGN    TIMING    ESTIMATE
                           90/09   LOW    HIST/
                                        ARCH
90/09 MEDIUM   SOLID
               WASTE
                        ADEQUATE  ADEQUATE   ADEQUATE
                         DESIGN    TIMING    ESTIMATE
         ADEQUATE  ADEQUATE   ADEQUATE
          DESIGN    TIMING    ESTIMATE
                           90/09  MEDIUM   SOLID    ADEQUATE  ADEQUATE   ADEQUATE
                                         WASTE     DESIGN    TIMING    ESTIMATE
90/09 MEDIUM   SOLID
               WASTE
90/09  LOW
SOLID
WASTE
         ADEQUATE  ADEQUATE    ADEQUATE
          DESIGN    TIMING    ESTIMATE
                                                  ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE

-------
                                  FEDERAL  AGENCY  POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                          DEPARTMENT  OF  ARMY                      USA TRAINING ft DOCTRINE COM
                 PROJECT IDENTIFICATION
                     REQ     EST    PROJECT
  BUDGET     COMPL   COMPL  COMPL  ASSESS- MEDIA
(THOUSANDS)   STATUS  DATE    DATE   MENT    TYPE
                                                                     ARMY-5Z
  ADEQUACY OF PROJECT
ENGIN-
EERING    TIME      COST
 GA-213720084 PROJECT:  BEN-89-S1
 EMERGENCY REMOVAL OF ASBESTOS
 ACCT:  OMA OPERATIONS & MAINT.ARMY
 FORT BENNING
 FORT BENNING                    GA

 GA-213720368 PROJECT:  GOR-89-S7
 PHASE  1  ARCHAEOLOGICAL SURVEY
 ACCT:  OMA OPERATIONS ft MAINT.ARMY
 FORT GORDON
 FORT GORDON                     GA

 GA-213720368 PROJECT:  GOR-89-S22
 ASBESTOS REMOVAL  -  FAMILY HOUSING
 ACCT:  AFHU920) SERIES (MAINT, REPA
 FORT GORDON
 FORT GORDON                     GA

 GA-213720368 PROJECT:  GOR-89-S13
 REMOVAL  OF  ASBESTOS  CONTAINING MATERIALS
 ACCT:  OMA OPERATIONS ft MAINT.ARMY
 FORT GORDON
 FORT GORDON                     GA

 GA-213720368  PROJECT:  GOR-89-S28
 RI/FS  EVALUATION OF  SWMU
 ACCT:  DERA
 FORT GORDON
 FORT GORDON                      GA

GA-213720368  PROJECT:  GOR-89-S4
REMOVAL OF UST - SITE  REMEDIATION
ACCT: DERA
FORT GORDON
FORT GORDON                      GA
                                                      200.0  ESRO
                           90/09   LOW     TOXIC    ADEQUATE  ADEQUATE   ADEQUATE
                                       SUBSTANCE   DESIGN    TIMING    ESTIMATE
       50.0   ESDF    95/09   90/09 MEDIUM  HIST/     ADEQUATE  ADEQUATE   ADEQUATE
                                        ARCH       DESIGN    TIMING    ESTIMATE
      100.0   OTHR    99/12   90/09   LOW    MULTI     ADEQUATE  ADEQUATE   ADEQUATE
                                        MEDIA      DESIGN    TIMING    ESTIMATE
      200.0   OTHR    99/12   90/09   LOW    MULTI     ADEQUATE  ADEQUATE   ADEQUATE
                                        MEDIA      DESIGN    TIMING    ESTIMATE
      500.0   ESDF    99/09  90/09 MEDIUM   CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
     500.0   ESDF   92/12  90/09 MEDIUM   SOLID    ADEQUATE  ADEQUATE   ADEQUATE
                                         WASTE     DESIGN    TIMING    ESTIMATE

-------
                                 FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                         DEPARTMENT OF ARMY                      USA TRAINING * DOCTRINE COM
                PROJECT IDENTIFICATION
                     REQ    EST   PROJECT
  BUDGET     CQMPL   COMPL  COMPL ASSESS- MEDIA
(THOUSANDS)  STATUS  BATE   DATE  MENT   TYPE
                                                                                                                     ARMY-53
                            ADEQUACY OF PROJECT
                          ENGIN-
                          EERING    TIME      COST
KY-213720479 PROJECT: KNO-89-S41
ASBESTOS MITIGATION - HOUSING
ACCT: DMA OPERATIONS t MAINT.ARMY
FORT KNOX
FORT KNOX                        KY

KY-213720479 PROJECT: KNO-89-S14
TEST WATER WELL FIELD FOR TOXICS
ACCT: DMA OPERATIONS t MAINT.ARMY
FORT KNOX
FORT KNOX                        KY

KY-213720479 PROJECT: KNO-89-S5
UPDATE ICUZ PROGRAM
ACCT: OMA OPERATIONS * MAINT.ARMY
FORT KNOX
FORT KNOX                        KY

KY-213720479 PROJECT: KNO-89-S4
WASTE DISPOSAL FUNDING
ACCT: OMA OPERATIONS & MAINT.ARMY
FORT KNOX
FORT KNOX                        KY

KY-213720479 PROJECT: KNO-89-S40
TEST UNDERGROUND STORAGE TANKS AT RESERVE CENTE
ACCT: OMA OPERATIONS * MAINT.ARMY
FORT KNOX
FORT KNOX                        KY

KY-213720479 PROJECT: KNO-89-S32
HAZARDOUS.WASTE DISPOSAL AT RESERVE CENTERS
ACCT: OMA OPERATIONS & MAINT.ARMY
FORT KNOX
FORT KNOX                        KY
      100.0  CMPA
                           90/09  HIGH     AIR     ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
       10.0   CMPA   94/12   90/09   HIGH   DRINKING  ADEQUATE  ADEQUATE   ADEQUATE
                                         WATER     DESIGN    TIMING    ESTIMATE
       10.0   ESRO
90/09 MEDIUM   NOISE    ADEQUATE  ADEQUATE    ADEQUATE
                         DESIGN    TIMING     ESTIMATE
      200.0   CMPA   94/12   90/09   HIGH
       10.0   CMPA    89/12   90/09  HIGH
               SOLID    ADEQUATE  ADEQUATE   ADEQUATE
               WASTE     DESIGN    TIMING    ESTIMATE
                                         SOLID    ADEQUATE  ADEQUATE   ADEQUATE
                                         WASTE     DESIGN    TIMING    ESTIMATE
       30.0   CMPA
90/09  HIGH    SOLID    ADEQUATE   ADEQUATE   ADEQUATE
               WASTE     DESIGN   TIMING    ESTIMATE

-------
                                  FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                          DEPARTMENT  OF ARMY                      USA TRAINING & DOCTRINE COM
                 PROJECT IDENTIFICATION
                     REQ    EST   PROJECT
  BUDGET     COMPL    COMPL  COMPL ASSESS- MEDIA
(THOUSANDS)   STATUS   DATE   DATE  MENT    TYPE
                                                                                                                     ARMY-54
    ADEQUACY OF PROJECT
  ENGIN-
  EERING    TIME      COST
 KY-213720479 PROJECT:  KNO-89-S27
 REPLACE LEAKING UNDERGROUND  STORAGE TANKS
 ACCT:  DMA OPERATIONS & MAINT.ARMY
 FORT KNOX
 FORT KNOX                       KY

 KY-213720479 PROJECT:  KNO-89-S28
 MONITORING,  CATHODIC PROTECTION, FOR UST'S
 ACCT:  OMA OPERATIONS & MAINT.ARMY
 FORT KNOX
 FORT KNOX                       KY

 KY-213720479 PROJECT:  KNO-89-S26
 REMOVE  ABANDONED UST'S
 ACCT:  DERA
 FORT KNOX
 FORT KNOX                       KY

 KY-213720479  PROJECT:  WHAT-11
 TRACK/CLEAN  UP GROUNDWATER CONTAMINATION
 ACCT: OMA OPERATIONS & MAINT.ARMY
 FORT KNOX
 FORT KNOX                       KY

 KY-213720479  PROJECT:  KNO-89-S30
 CONSTRUCT INERT MATERIALS LANDFILL
 ACCT: OMA OPERATIONS & MAINT.ARMY
 FORT KNOX
 FORT KNOX                        KY

KY-213720479 PROJECT: KNO-89-S21
SERVICE AND MAINTAIN OIL-WATER SEPARATORS
ACCT: OMA OPERATIONS & MAINT.ARMY
FORT KNOX
FORT KNOX                        KY
       50.0   CMPA    90/03   90/09  HIGH    SOLID
                                         WASTE
       75.0   CMPA    98/12   90/09  HIGH    SOLID
                                         WASTE
      125.0   CMPA    92/08  90/09  HIGH
       50.0   PSDF    93/09  90/09  HIGH
       25.0  ESDF
                                         SOLID
                                         WASTE
                                         SOLID
                                         WASTE
       50.0   ESRO    91/05  91/01  LOW     SOLID
                                         WASTE
                          90/09 MEDIUM   WATER
ADEQUATE  ADEQUATE   ADEQUATE
 DESIGN    TIMING    ESTIMATE
ADEQUATE  ADEQUATE   ADEQUATE
 DESIGN    TIMING    ESTIMATE
ADEQUATE  ADEQUATE   ADEQUATE
 DESIGN    TIMING    ESTIMATE
ADEQUATE  ADEQUATE   ADEQUATE
 DESIGN    TIMING    ESTIMATE
ADEQUATE  ADEQUATE   ADEQUATE
 DESIGN    TIMING    ESTIMATE
                                                  ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE

-------
                                 FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                         DEPARTMENT OF ARMY                      USA TRAINING t DOCTRINE COM
                PROJECT IDENTIFICATION
                     REQ    EST   PROJECT
  BUDGET     COMPL   COMPL  COMPL ASSESS- MEDIA
(THOUSANDS)  STATUS  DATE   DATE  MENT    TYPE
                                                                                                                      ARMY-55
    ADEQUACY OF PROJECT
  ENGIN-
  EERING    TIME      COST
MO-213720979 PROJECT: LWD-89-S30
RADON DECTOR INSTALLATION, PRIORITY 3 BLDGS
ACCT: DMA OPERATIONS & MAINT.ARMY
FORT LEONARD WOOD
FORT LEONARD WOOD                MO

MO-213720979 PROJECT: LWD-89-S37
SURVEY OF BUILDINGS FOR ASBESTOS
ACCT: DMA OPERATIONS & MAINT.ARMY
FORT LEONARD WOOD
FORT LEONARD WOOD                MO

MO-213720979 PROJECT: LWD-89-S8
WILDLIFE HABITAT MANAGEMENT
ACCT: DMA OPERATIONS & MAINT.ARMY
FORT LEONARD WOOD
FORT LEONARD WOOD                MO

MO-213720979 PROJECT: LWD-89-S10
DISTURBED LANDS RESTORATION
ACCT: DMA OPERATIONS * MAINT.ARMY
FORT LEONARD WOOD
FORT LEONARD WOOD                MO

MO-213720979 PROJECT: LWD-89-S9
US SOIL CON. SERV. SUPPORT AGREEMENT
ACCT: DMA OPERATIONS 4 MAINT.ARMY
FORT LEONARD WOOD
FORT LEONARD WOOD                MO

MO-213720979 PROJECT: 8811
ST LOUIS ORDNANCE HANLEY AREA REMEDIATION
ACCT: DERA
FORT LEONARD WOOD
FORT LEONARD WOOD                MO
       35.0  ESRO   90/12  90/09  LOW      AIR
      300.0  OTHR   91/12   90/09 MEDIUM    AIR
 UNDER    ADEQUATE   ADEQUATE
 DESIGN    TIMING    ESTIMATE
                                                     NOT       NOT
                                                    AVAIL     AVAIL
       15.0   OTHR    90/12   $0/09   LOW     LAND
                                         MGMT
    8,500.0   OTHR    90/09  90/09   LOW     LAND
                                         MGMT
                       NOT
                      AVAIL
   25,000.0   OTHR   90/09  90/09   LOW    ENDANGRD   ADEQUATE  ADEQUATE   ADEQUATE
                                        SPECIES     DESIGN    TIMING    ESTIMATE
ADEQUATE  ADEQUATE   ADEQUATE
 DESIGN    TIMING    ESTIMATE
ADEQUATE  ADEQUATE   ADEQUATE
 DESIGN    TIMING    ESTIMATE
      250.0   ESDP   94/01   90/09   HIGH    CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE

-------
                                  FEDERAL AGENCY  POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                          DEPARTMENT OF  ARMY                      USA TRAINING & DOCTRINE COM
                 PROJECT IDENTIFICATION
                     REQ    EST    PROJECT
  BUDGET     COMPL   COMPL  COMPL  ASSESS- MEDIA
(THOUSANDS)   STATUS  DATE    DATE   MENT    TYPE
                                                                     ARMY-56
                            ADEQUACY OF PROJECT
                          ENGIN-
                          EERING    TIME      COST
 MO-213720979 PROJECT:  FE52774J
 WELDON SPRING RESTORATION STUDY AND  REMEDIATION
 ACCT:  DERA
 FORT LEONARD WOOD
 FORT LEONARD WOOD                MO

 MO-213720979 PROJECT:  LWD-89-S15
 UPGRADE UST'S INSTALLED  BETWEEN 1970-1974
 ACCT:  DMA  OPERATIONS & MAINT,ARMY
 FORT LEONARD WOOD
 FORT LEONARD WOOD                MO

 MO-213720979 PROJECT:  LWD-SW-6
 CONSTRUCT  GREASE  SEPARATOR
 ACCT:  OMA  OPERATIONS & MAINT.ARMY
 FORT LEONARD WOOD
 FORT LEONARD WOOD                 MO

 MO-213720979 PROJECT:  LWD-89-S23
 PROVIDE  EMERGENCY POWER TO WATER  TREATMENT PLAN
 ACCT:  OMA  OPERATIONS * MAINT.ARMY
 FORT LEONARD  WOOD
 FORT LEONARD  WOOD                 MO

 NJ-213720275  PROJECT:  DIX-89-S11
 RETROFIT RRF  WITH MERCURY EMISSIONS CONTROL APR
 ACCT: OMA  OPERATIONS & MAINT.ARMY
 FORT DIX
 FORT DIX                         NJ

NJ-213720275  PROJECT:  T2
ASBESTOS REMOVAL BOILER PLANTS AND HOSPITA
ACCT: OMA OPERATIONS & MAINT.ARMY
FORT DIX
FORT DIX                         NJ
    5,500.0   ESDP   94/12   90/09  HIGH    CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
       60.0   ESDF    91/12   91/01  HIGH    SOLID    ADEQUATE  ADEQUATE     LOW
                                         WASTE     DESIGN    TIMING    ESTIMATE
       30.0   ESRO    90/01   90/09 MEDIUM   SOLID      NOT       NOT
                                         WASTE     AVAIL     AVAIL
      100.0   ESRO
      150.0   INOV
   4,000.0  PSDF
                          91/10 MEDIUM   WATER      NOT       NOT
                                                   AVAIL     AVAIL
                                               NOT
                                              AVAIL
                                               NOT
                                              AVAIL
90/09  HIGH     AIR     ADEQUATE  ADEQUATE   ADEQUATE
                         DESIGN    TIMING    ESTIMATE
90/09 MEDIUM    AIR     ADEQUATE  ADEQUATE   ADEQUATE
                         DESIGN    TIMING    ESTIMATE

-------
                                 FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                         DEPARTMENT OF ARMY                      USA TRAINING & DOCTRINE COM
                PROJECT IDENTIFICATION
                     REQ    EST   PROJECT
  BUDGET     COMPL   COMPL  COMPL ASSESS- MEDIA
(THOUSANDS)   STATUS  DATE   DATE   MENT    TYPE
                                                                                                                      ARMY-57
                            ADEQUACY OF PROJECT
                          ENGIN-
                          EERING    TIME      COST
NJ-213720275 PROJECT: FD-SF-1
INSTALLATION RESTORATION SURVEY
ACCT: DERA
FORT DIX
FORT DIX                         NJ

NJ-213720275 PROJECT: DIX-89-S21
NPL LANDFILL
ACCT: DERA
FORT DIX
FORT DIX                         NJ

NJ-213720275 PROJECT: TD 88-017
MONITORING GROUNDWATER FT DIX LANDFILL (NPL SIT
ACCT: DERA
FORT DIX
FORT DIX                         NJ

NJ-213720275 PROJECT: DIX-89-S12
INSTALL UST LEAK DETECTION SYSTEMS
ACCT: OMA OPERATIONS t MAINT.ARMY
FORT DIX
FORT DIX                         NJ

NJ-213720275 PROJECT: DIX-89-S10
HAZARDOUS WASTE DISPOSAL PROGRAM
ACCT: OMA OPERATIONS ft MAINT.ARMY
FORT DIX
FORT DIX                         NJ

NJ-213720275 PROJECT: DIX-89-S14
ASBESTOS ABATEMENT PROJECTS/REDUCE HEALTH RISK
ACCT: MILCON,ARMY (MCA)
FORT DIX
FORT DIX                         NJ
      215.0  PSDF   93/01   90/09  HIGH
      600.0  CMPA
                           90/09  HIGH
                                          CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
               SOLID    ADEQUATE  ADEQUATE    ADEQUATE
               WASTE     DESIGN    TIMING    ESTIMATE
      200.0  CMPA   90/12  90/09  HIGH     SOLID    ADEQUATE  ADEQUATE   ADEQUATE
                                          WASTE     DESIGN    TIMING    ESTIMATE
       54.0  PSDF
       55.0   PSDF
      752.0   OTHR
90/09 MEDIUM   SOLID    ADEQUATE  ADEQUATE   ADEQUATE
               WASTE     DESIGN    TIMING    ESTIMATE
                           90/09 MEDIUM   SOLID    ADEQUATE  ADEQUATE   ADEQUATE
                                         WASTE     DESIGN    TIMING    ESTIMATE
90/09 MEDIUM   TOXIC    ADEQUATE  ADEQUATE   ADEQUATE
             SUBSTANCE    DESIGN    TIMING    ESTIMATE

-------
                                  FEDERAL AGENCY  POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                          DEPARTMENT OF  ARMY                      USA TRAINING & DOCTRINE COM
                 PROJECT IDENTIFICATION
                     REQ    EST   PROJECT
  BUDGET     COMPL    COMPL  COMPL ASSESS- MEDIA
(THOUSANDS)   STATUS   DATE   DATE  MENT    TYPE
                                                                                                                      ARMY-58
    ADEQUACY OF PROJECT
  ENGIN-
  EERING    TIME      COST
 NJ-213720275 PROJECT:  Tl
 REGIONAL WASTEWATER TREATMENT FACILITY
 ACCT: MILCON.ARMY (MCA)
 FORT DIX
 FORT DIX                        NJ

 NJ-213720275 PROJECT:  DIX-89-S15
 REPAIR GRIT REMOVAL SYSTEMS  AT BLDG. 4309 & 180
 ACCT: OMA OPERATIONS & MAINT.ARMY
 FORT DIX
 FORT DIX                        NJ

 NJ-213720275 PROJECT:  DIX-89-S17
  REPAIR  DRYING  BEDS BUILDING  4312
 ACCT:  OMA OPERATIONS t MAINT,ARMY
 FORT DIX
 FORT DIX                        NJ

 NJ-213720275 PROJECT:  DIX-89-S19
 CORRECT  INFLOW/INFILTRATION-WASTEWATER COLLECTI
 ACCT:  OMA OPERATIONS & MAINT.ARMY
 FORT DIX
 FORT DIX                        NJ

 NJ-213720275  PROJECT:  87-C-0125
 USE  SOLVENT  ELIMINATION
 ACCT: OMA  OPERATIONS i MAINT.ARMY
 FORT DIX
 FORT DIX                         NJ
   60,000.0   CMPA    91/02   90/09  HIGH    HATER
       90.0   ESRO
      350.0   ESRO
      500.0   ESRO
      46.0  ESDL
                          90/09 MEDIUM   WATER
                          90/09 MEDIUM   WATER
                          90/09 MEDIUM   WATER
                          90/09 MEDIUM   WATER
                                                  ADEQUATE  ADEQUATE     LOW
                                                   DESIGN    TIMING    ESTIMATE
                                                  ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
                                                  ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
                                                  ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
ADEQUATE  ADEQUATE   ADEQUATE
 DESIGN    TIMING    ESTIMATE
OK-213720846 PROJECT: SIL-69-S6
RADON SCREENING AND MITIGATION
ACCT: OMA OPERATIONS & MAINT.ARMY
FORT SILL
FORT SILL                        OK
     560.0  ESDP   90/06  90/09  HIGH     AIR
                                                  ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE

-------
                                 FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                         DEPARTMENT OF ARMY                      USA TRAINING & DOCTRINE COM
                PROJECT IDENTIFICATION
                     REQ    EST    PROJECT
  BUDGET     COMPL   COMPL  COMPL  ASSESS- MEDIA
(THOUSANDS)   STATUS  DATE    DATE   MENT    TYPE
                                                                                                                     ARMY-59
                            ADEQUACY OF  PROJECT
                          ENGIN-
                          EERING     TIME      COST
OK-213720846 PROJECT: SIL-89-S15
ASSESSMENT OF INSTALLATION INCENERATOR SITES
ACCT: DMA OPERATIONS ft MAINT,ARMY
FORT SILL
FORT SILL                        OK

OK-213720846 PROJECT: SIL-89-S1
DESIGN FOR ASBESTOS ABATEMENT AND REMOVAL
ACCT: OMA OPERATIONS & MAINT.ARMY
FORT SILL
FORT SILL                        OK

OK-213720846 PROJECT: SIL-89-S5
SURVEY FOR ASBESTOS/RISK ASSESSMENT/MGMT PLAN
ACCT: OMA OPERATIONS ft MAINT.ARMY
FORT SILL
FORT SILL                        OK

OK-213720846 PROJECT: SIL-89-S2
ASBESTOS REMOVAL AND ABATEMENT
ACCT: OMA OPERATIONS ft MAINT.ARMY
FORT SILL
FORT SILL                        OK

OK-213720846 PROJECT: SIL-89-S3
ASBESTOS O&M TEAM, SUPPLIES, AND EQUIPMENT
ACCT: OMA OPERATIONS ft MAINT.ARMY
FORT SILL
FORT SILL                        OK

OK-213720846 PROJECT: SIL-S9-S4
ASBESTOS REGULATORY/MANDATORY TRAINING
ACCT: OMA OPERATIONS' ft MAINT,ARMY
FORT SILL
FORT SILL                        OK
      800.0  PSDF
      250.0  ESRO
      250.0  ESRO
    2,500.0  ESRO
      500.0  ESRO
       80.0   ESRO
90/09 MEDIUM    AIR     ADEQUATE  ADEQUATE    ADEQUATE
                         DESIGN    TIMING    ESTIMATE
94/09  HIGH     AIR     ADEQUATE  ADEQUATE    ADEQUATE
                         DESIGN    TIMING    ESTIMATE
90/09  HIGH     AIR     ADEQUATE  ADEQUATE    ADEQUATE
                         DESIGN    TIMING    ESTIMATE
94/09  HIGH     AIR     ADEQUATE   ADEQUATE    ADEQUATE
                         DESIGN    TIMING     ESTIMATE
                           90/09  HIGH     AIR     ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
                           90/09  HIGH     AIR     ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE

-------
                                  FEDERAL AGENCY  POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                          DEPARTMENT OF ARMY                      USA TRAINING & DOCTRINE COM
                 PROJECT IDENTIFICATION
                     REQ     EST    PROJECT
  BUDGET     COMPL   COMPL   COMPL  ASSESS- MEDIA
(THOUSANDS)   STATUS  DATE    DATE   MENT    TYPE
                                                                     ARMY-60
                            ADEQUACY OF PROJECT
                          ENGIN-
                          EERING    TIME      COST
 OK-213720846 PROJECT:  SIL-89-S7
 MAINTAIN NATIONAL LANDMARK DISTRICT  STRUCTURES
 ACCT:  OMA OPERATIONS & MAINT.ARMY
 FORT SILL
 FORT SILL                       OK

 OK-213720S46 PROJECT:  SIL-89-S14
 ENVIRONMENTAL LICENSURE AND PERMIT FEES
 ACCT:  OMA OPERATIONS & MAINT.ARMY
 FORT SILL
 FORT SILL                       OK

 OK-213720846 PROJECT:  SIL-89-S11
 RCRA HAZARDOUS WASTE COMPLIANCE
 ACCT:  OMA OPERATIONS £ MAINT,ARMY
 FORT SILL
 FORT SILL                       OK

 OK-213720846  PROJECT:  SIL-89-S10
 RCRA HAZARDOUS WASTE TRAINING/ NOV REQUIREMENT
 ACCT:  OMA OPERATIONS 4  MAINT.ARMY
 FORT SILL
 FORT SILL                       OK

 OK-213720846  PROJECT:  SIL-S9-S16
 INSTALLATION  RI/FS
 ACCT: DERA
 FORT SILL
 FORT SILL                        OK

OK-2137208<+6  PROJECT: SIL-89-S13
UNDERGROUND STORAGE TANKS
ACCT: OMA OPERATIONS & MAINT.ARMY
FORT SILL
FORT SILL                        OK
                                                       50.0  ESDF
       20.0   ESDF
      750.0   INOV
                           90/09 MEDIUM  HIST/     ADEQUATE  ADEQUATE   ADEQUATE
                                        ARCH       DESIGN    TIMING    ESTIMATE
                           90/09 MEDIUM  MULTI     ADEQUATE  ADEQUATE   ADEQUATE
                                        MEDIA      DESIGN    TIMING    ESTIMATE
                           90/09  HIGH
      150.0   INOV    90/01  90/09  HIGH
    1,000.0   INOV
                                         SOLID
                                         WASTE
                                         SOLID
                                         WASTE
90/09  HIGH    SOLID
               WASTE
     500.0  ESDF   98/12  90/09 MEDIUM   SOLID
                                         WASTE
                        ADEQUATE  ADEQUATE    ADEQUATE
                         DESIGN    TIMING    ESTIMATE
                        ADEQUATE   ADEQUATE    ADEQUATE
                         DESIGN    TIMING    ESTIMATE
ADEQUATE  ADEQUATE   ADEQUATE
 DESIGN    TIMING    ESTIMATE
                        ADEQUATE   ADEQUATE    ADEQUATE
                         DESIGN    TIMING    ESTIMATE

-------
                                 FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                         DEPARTMENT OF ARMY                      USA TRAINING i DOCTRINE COM
                PROJECT IDENTIFICATION
                     REQ    EST   PROJECT
  BUDGET     COMPL   COMPL  COMPL ASSESS- MEDIA
(THOUSANDS)  STATUS  DATE   DATE   MENT    TYPE
                                                                                                                     ARMY-61
                            ADEQUACY  OF  PROJECT
                          ENGIN-
                          EERING   TIME      COST
CK-213720846 PROJECT: SIL-89-S8
REMOVAL OF ACM IN WW II BUILDINGS TO BE DEMOLIS
ACCT: OMA OPERATIONS * MAINT.ARMY
FORT SILL
FORT SILL                        OK

SC-213720449 PROJECT: JAC-89-S7
PHASE 1 ARCHAEOLOGICAL SURVEY
ACCT: OMA OPERATIONS t MAINT.ARMY
FORT JACKSON
FORT JACKSON                     SC

TX-213720101 PROJECT: BLI-80-F9
MITIGATION OF RADON POLLUTION PROBLEMS
ACCT: DERA
FORT BLISS
FORT BLISS                       TX

TX-213720101 PROJECT: BLI-80-F10
DRINKING WATER TESTING FOR LEAD AND COPPER
ACCT: OMA OPERATIONS & MAINT.ARMY
FORT BLISS
FORT BLISS                       TX

TX-213720101 PROJECT: BLI-89-S34
ENDANGERED SPECIES SURVEY, ORGAN MTS
ACCT: OMA OPERATIONS & MAINT.ARMY
FORT BLISS
FORT BLISS                       TX

TX-213720101 PROJECT: BLI-89-S35
FIRE PROTECTION & MANAGEMENT FOR THE ORGAN MTS.
ACCT: OMA OPERATIONS & MAINT.ARMY
FORT BLISS
FORT BLISS                       TX
    1,500.0  CMPA
      310.0   ESDP
       50.0   ESRO
       60.0   PSDF
90/09  HIGH    TOXIC    ADEQUATE   ADEQUATE    ADEQUATE
             SUBSTANCE   DESIGN    TIMING     ESTIMATE
90/09 MEDIUM  HIST/     ADEQUATE  ADEQUATE   ADEQUATE
              ARCH       DESIGN    TIMING    ESTIMATE
90/09  LOW      AIR     ADEQUATE   ADEQUATE   ADEQUATE
                         DESIGN    TIMING    ESTIMATE
                           90/09  MEDIUM  DRINKING  ADEQUATE  ADEQUATE   ADEQUATE
                                         WATER     DESIGN    TIMING    ESTIMATE
       10.0   ESDP   93/12   90/09  HIGH   ENDANGRD     NOT       NOT        NOT
                                        SPECIES     AVAIL     AVAIL      AVAIL
       85.0   ESDP    95/12   90/09  HIGH  ENDANGRD     NOT       NOT        NOT
                                       SPECIES     AVAIL     AVAIL      AVAIL

-------
                                  FEDERAL  AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                          DEPARTMENT OF  ARMY                      USA TRAINING & DOCTRINE COM
                 PROJECT IDENTIFICATION
                     REQ    EST   PROJECT
  BUDGET     COMPL    COMPL  COMPL ASSESS- MEDIA
(THOUSANDS)   STATUS   DATE   DATE  MENT    TYPE
                                                                                                                     ARMY-62
                            ADEQUACY  OF  PROJECT
                          ENGIN-
                          EERING   TIME      COST
 TX-213720101 PROJECT:  BLI-89-S36
 WILDLIFE WATER ENHANCEMENT
 ACCT:  OMA OPERATIONS ft MAINT.ARMY
 FORT BLISS
 FORT BLISS                      TX

 TX-213720101 PROJECT:  BLI-89-S16
 STANDARDIZE  & COMPUTERIZE  SITE  & ARTIFACT FILES
 ACCT:  CMA OPERATIONS & MAINT.ARMY
 FORT BLISS
 FORT BLISS                      TX

 TX-213720101  PROJECT:  BLI-89-S18
 ONGOING  MITIGATION:SURF COLL,TEST,EXCAV.FY90-94
 ACCT:  OMA OPERATIONS & MAINT.ARMY
 FORT BLISS
 FORT BLISS                      TX

 TX-213720101  PROJECT:  BLI-89-S19
 CHRONOMETRIC  AND RELATIVE CHRONOLOGY STUDY
 ACCT:  OMA  OPERATIONS & MAINT.ARMY
 FORT BLISS
 FORT BLISS                      TX

 TX-213720101  PROJECT: BLI-89-S20
 INVENTORY  AND CHARACTERIZE UTHIC SOURCES
 ACCT:  OMA  OPERATIONS 4 MAINT.ARMY
 FORT BLISS
 FORT BLISS                       TX

TX-213720101  PROJECT: BLI-89-S23
HIST RES SURVEY, NEW MANEUVER AREA, MCGREGOR RN
ACCT: OMA  OPERATIONS & MAINT.ARMY
FORT BLISS
FORT BLISS                       TX
       17.0   ESDF    94/12  90/09 MEDIUM ENDANGRD     NOT       NOT
                                       SPECIES     AVAIL     AVAIL
      144.0   ESDP    92/12  90/09  HIGH   HIST/
                                        ARCH
      238.0   ESDP    99/12  90/09  HIGH   HIST/
                                        ARCH
       88.0   ESDP   93/09  90/09  HIGH   HIST/
                                        ARCH
      68.0  ESDP   91/09  90/09  HIGH   HIST/
                                        ARCH
                          NOT       NOT
                         AVAIL     AVAIL
                          NOT
                         AVAIL
                          NOT
                         AVAIL
 NOT
AVAIL
 NOT
AVAIL
                          NOT       NOT
                         AVAIL     AVAIL
    1,544.0  ESDF
                                               NOT
                                              AVAIL
            NOT
           AVAIL
 NOT
AVAIL
 NOT
AVAIL
            NOT
           AVAIL
90/09 MEDIUM  HIST/     ADEQUATE   ADEQUATE    ADEQUATE
              ARCH       DESIGN    TIMING    ESTIMATE

-------
                                 FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                         DEPARTMENT OF ARMY                      USA TRAINING & DOCTRINE COM
                PROJECT IDENTIFICATION
                     REQ    EST    PROJECT
  BUDGET     COMPL   COMPL  COMPL  ASSESS- MEDIA
(THOUSANDS)   STATUS  DATE    DATE   MENT    TYPE
                                                                                                                     ARMY-63
                            ADEQUACY  OF  PROJECT
                          ENGIN-
                          EERING    TIME     COST
TX-213720101 PROJECT: BLI-89-S24
TEST REALITY OF LOCAL "DONA ANA" CULTURAL PHASE
ACCT: DMA OPERATIONS t MAINT.ARMY
FORT BLISS
FORT BLISS                       TX

TX-213720101 PROJECT: BLI-89-S32
ECOLOGICAL IMPACT MONITORING OF TRAINING AREAS
ACCT: DMA OPERATIONS & MAINT.ARMY
FORT BLISS
FORT BLISS                       TX

TX-213720101 PROJECT: BLI-89-S33
ECOLOGICAL IMPACT STUDIES FOR MA9 EIS
ACCT: DMA OPERATIONS & MAINT.ARMY
FORT BLISS
FORT BLISS                       TX

TX-213720101 PROJECT: BLI-89-S37
ECOLOGICAL IMPACT STUDY,PROPOSED MCGREGOR MAN.A
ACCT: DMA OPERATIONS & MAINT.ARMY
FORT BLISS
FORT BLISS                       TX

TX-213720101 PROJECT: BLI-89-S38
ECOLOGICAL IMPACT STUDY, DONA ANA RANGES UPGRAD
ACCT: OMA OPERATIONS & MAINT.ARMY
FORT BLISS
FORT BLISS                       TX

TX-213720101 PROJECT: BLI-80-F4
HAZARDOUS WASTE ANALYSIS
ACCT: OMA OPERATIONS & MAINT.ARMY
FORT BLISS
FORT BLISS                       TX
       34.0  ESDF
92/01 MEDIUM  HIST/
              ARCH
ADEQUATE  ADEQUATE   ADEQUATE
 DESIGN    TIMING    ESTIMATE
      187.0  ESDP   93/12   90/09  HIGH    LAND
                                         MGMT
       10.0   ESDP   93/07   90/09  HIGH   MULTI
                                        MEDIA
      661.0   OTHR    94/12   90/09 MEDIUM  MULTI
                                        MEDIA
       50.0   OTHR    94/12   91/06 MEDIUM  MULTI
                                        MEDIA
       20.0   CMPA    89/03   90/09  HIGH    SOLID
                                         WASTE
                          NOT
                         AVAIL
                          NOT
                         AVAIL
                          NOT
                         AVAIL
                          NOT
                         AVAIL
            NOT
           AVAIL
            NOT
           AVAIL
            NOT
           AVAIL
            NOT
           AVAIL
 NOT
AVAIL
 NOT
AVAIL
 NOT
AVAIL
 NOT
AVAIL
                       ADEQUATE  ADEQUATE   ADEQUATE
                        DESIGN    TIMING    ESTIMATE

-------
                                  FEDERAL  AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                          DEPARTMENT  OF  ARMY                      USA TRAINING 4 DOCTRINE COM
                 PROJECT IDENTIFICATION
                     REQ    EST    PROJECT
  BUDGET     COMPL   COMPL   COMPL  ASSESS- MEDIA
(THOUSANDS)   STATUS  DATE    DATE   MENT    TYPE
                                                                                                                      ARMY-64
    ADEQUACY OF PROJECT
  ENGIN-
  EERING    TIME      COST
 TX-213720101  PROJECT:  BLI-80-F2
 UNDERGROUND  STORAGE  TANK  REMOVAL
 ACCT:  DERA -  DMA  (OPERATIONS AND MA
 FORT BLISS
 FORT BLISS                      TX

 TX-213720101  PROJECT:  BLI-80-F3
 UPGRADING  OF  UNDERGROUND  STORAGE TANKS
 ACCT:  DERA
 FORT BLISS
 FORT BLISS                      TX

 TX-213720101  PROJECT:  BLI-80-F6
 HAZARDOUS  WASTE DISPOSAL
 ACCT:  DMA  OPERATIONS 8, MAINT.ARMY
 FORT BLISS
 FORT BLISS                      TX

 TX-213720101  PROJECT:  BLI-89-S11
 UNDERGROUND STORAGE TANK  TESTING
 ACCT:  DERA
 FORT BLISS
 FORT BLISS                      TX

 TX-213720101  PROJECT:  BLI-89-S12
 UNDERGROUND STORAGE TANK  REMOVAL AND REPLACEMEN
 ACCT: DERA
 FORT BLISS
 FORT BLISS                       TX

TX-213720101  PROJECT:  BLI-89-S13
UNDERGROUND STORAGE TANK  UPGRADING
ACCT: DERA
FORT BLISS
FORT BLISS                       TX
    1,315.0  INOV   91/12   90/09  HIGH    SOLID
                                         WASTE
      420.0   ESDF    98/12   91/01  MEDIUM   SOLID
                                         WASTE
      150.0  ESDF    90/01   90/09  MEDIUM    SOLID
                                          WASTE
       54.0   ESDF    90/12   90/12  MEDIUM   SOLID
                                         WASTE
      395.0   ESDF    98/12   90/09  MEDIUM   SOLID
                                         WASTE
      420.0   ESDF    98/12   90/12 MEDIUM   SOLID
                                         WASTE
ADEQUATE  ADEQUATE   ADEQUATE
 DESIGN    TIMING    ESTIMATE
ADEQUATE  ADEQUATE   ADEQUATE
 DESIGN    TIMING    ESTIMATE
ADEQUATE  ADEQUATE   ADEQUATE
 DESIGN    TIMING    ESTIMATE
ADEQUATE  ADEQUATE   ADEQUATE
 DESIGN    TIMING    ESTIMATE
ADEQUATE  ADEQUATE   ADEQUATE
 DESIGN    TIMING    ESTIMATE
ADEQUATE  ADEQUATE   ADEQUATE
 DESIGN    TIMING    ESTIMATE

-------
                                 FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                         DEPARTMENT OF ARMY                      USA TRAINING * DOCTRINE COM
                PROJECT IDENTIFICATION
                     REQ    EST   PROJECT
  BUDGET     COMPX   COMPL  COMPL ASSESS-  MEDIA
(THOUSANDS)  STATUS  DATE   DATE  MENT     TYPE
                                                                                                                      ARMY-6S
                            ADEQUACY OF  PROJECT
                          ENGIN-
                          EERING    TIME      COST
VA-213720321 PROJECT: T108
BAILEY CREEK LANDFILL STUDY
ACCT: DERA
FORT EUSTIS
FORT EUSTIS
                                 VA
VA-213720603 PROJECT: MON-89-S11
ASBESTOS REMOVAL, VARIOUS BUILDINGS
ACCT: OMA OPERATIONS & MAINT.ARMY
FORT MONROE
FORT MONROE                      VA

VA-213720603 PROJECT: MON-S9-S2
THM REDUCTION BIG BETHEL WTP
ACCT: OMA OPERATIONS & MAINT.ARMY
FORT MONROE
FORT MONROE                      VA

VA-213720603 PROJECT: MON-89-S16
REPAIR STONEWORK, HISTORIC FORT
ACCT: OMA OPERATIONS & MAINT.ARMY
FORT MONROE
FORT MONROE                      VA

VA-213720603 PROJECT: MON-89-S13
NEPA DOCUMENTATION OF MCA PROJECTS
ACCT: OMA OPERATIONS & MAINT.ARMY
FORT MONROE
FORT MONROE                      VA

VA-213720603 PROJECT: MON-W-1
TEST UST'S—REPLACE AS REQUIRED
ACCT: OMA OPERATIONS 4 MAINT.ARMY
FORT MONROE
FORT MONROE                      VA
      100.0  ESDF
       50.0  ESDF
      250.0  ESDP
    1,000.0   ESDF
       10.0   ESDF
       75.0   ESDF
                           90/09 MEDIUM    SOLID
                                          WASTE
90/09 MEDIUM    AIR
                        ADEQUATE  ADEQUATE   ADEQUATE
                         DESIGN    TIMING    ESTIMATE
ADEQUATE  ADEQUATE   ADEQUATE
 DESIGN    TIMING    ESTIMATE
90/09  HIGH   DRINKING  ADEQUATE  ADEQUATE   ADEQUATE
               HATER     DESIGN    TIMING    ESTIMATE
90/09 MEDIUM  HIST/     ADEQUATE   ADEQUATE   ADEQUATE
              ARCH       DESIGN    TIMING    ESTIMATE
91/02 MEDIUM  MULTI
              MEDIA
90/09 MEDIUM   SOLID
               WASTE
ADEQUATE  ADEQUATE   ADEQUATE
 DESIGN    TIMING    ESTIMATE
ADEQUATE  ADEQUATE   ADEQUATE
 DESIGN    TIMING    ESTIMATE

-------
                                  FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                          DEPARTMENT OF ARMY                      USA TRAINING & DOCTRINE COM
                 PROJECT IDENTIFICATION
                     REQ     EST   PROJECT
  BUDGET     COMPL    COMPL   COMPL ASSESS- MEDIA
(THOUSANDS)   STATUS   DATE    DATE  MENT    TYPE
                                                                                                                     ARMY-66
                            ADEQUACY  OF  PROJECT
                          ENGIN-
                          EERING    TIME      COST
 VA-213720603 PROJECT:  MON-89-S5
 TEST UST FOR LEAKS
 ACCT:  DMA OPERATIONS  t MAINT.ARMY
 FORT MONROE
 FORT MONROE                      VA

 VA-213720603 PROJECT:  MON-89-S9
 UPGRADE  USTS
 ACCT:  OMA OPERATIONS  & MAINT.ARMY
 FORT MONROE
 FORT MONROE                      VA

 VA-213720603 PROJECT:  MON-89-S12
 REPLACEMENT  OF PCB TRANSFORMERS
 ACCT:  OMA  OPERATIONS t  MAINT.ARMY
 FORT MONROE
 FORT MONROE                      VA

VA-213720603  PROJECT: MON-89-S15
BEACH  EROSION CONTROL
ACCT:  OMA OPERATIONS & MAINT.ARMY
FORT MONROE
FORT MONROE                      VA

VA-213720603 PROJECT: MON-89-S8
REPAIR BIG BETHEL SLUDGE PLANT
ACCT: OMA OPERATIONS & MAINT.ARMY
FORT MONROE
FORT MONROE                      VA
                                                       20.0  ESDF
       50.0   ESDF
       15.0   ESDF
       25.0   ESDF
    1,139.0   ESDF
                           90/09 MEDIUM   SOLID    ADEQUATE  ADEQUATE   ADEQUATE
                                         WASTE     DESIGN    TIMING    ESTIMATE
                           90/09 MEDIUM   SOLID    ADEQUATE  ADEQUATE   ADEQUATE
                                         WASTE     DESIGN    TIMING    ESTIMATE
                          90/09 MEDIUM   TOXIC    ADEQUATE  ADEQUATE   ADEQUATE
                                       SUBSTANCE   DESIGN    TIMING    ESTIMATE
90/09 MEDIUM   WATER    ADEQUATE   ADEQUATE    ADEQUATE
                         DESIGN    TIMING    ESTIMATE
90/09 MEDIUM   WATER
                                                  ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
      TOTAL, USA TRAINING & DOCTRINE COM
             131,169.0
                137

-------
                                  FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                         DEPARTMENT OF ARMY                      ARMY MATERIAL COMMAND
                PROJECT IDENTIFICATION
                     REQ    EST    PROJECT
  BUDGET     COMPL   COMPL   COMPL  ASSESS- MEDIA
(THOUSANDS)   STATUS  DATE    DATE   MENT    TYPE
                                                                                                                     ARMY-67
                            ADEQUACY OF PROJECT
                          ENGIN-
                          EERING    TIME      COST
AL-213820027 PROJECT: AN-A-39
RADON SURVEYS
ACCT: INDUSTRIAL FUND
ANNISTON ARMY DEPOT
ANNISTON
                                 AL
AL-213820027 PROJECT: AN-A-41
RADON ABATEMENT PROJECTS
ACCT: OMA OPERATIONS & MAINT.ARMY
ANNISTON ARMY DEPOT
ANNISTON                         AL

AL-213820027 PROJECT: A002H
INSTALLATION RESTORATION
ACCT: DERA - OMA (OPERATIONS AND MA
ANNISTON ARMY DEPOT
ANNISTON                         AL

AL-213820027 PROJECT: AN-SW-7
HAZARDOUS WASTE DISPOSAL
ACCT: DERA - OMA (OPERATIONS AND MA
ANNISTON ARMY DEPOT
ANNISTON                         AL

AL-213820027 PROJECT: AN-SM-28
MANAGE DATS BRINE
ACCT: INDUSTRIAL FUND
ANNISTON ARMY DEPOT
ANNISTON                         AL

AL-213820027 PROJECT: AN-SW-3
TEST 4 REPAIR UNDERGROUND STORAGE TANK
ACCT: INDUSTRIAL FUND
ANNISTON ARMY DEPOT
ANNISTON                         AL
      142.0  ESDP
       66.0   ESDP
                           90/09  HIGH     AIR     ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
                           90/09  HIGH     AIR     ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
      100.0   ESDP    83/01   90/09  HIGH    CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
       26.0   CMPA
      100.0   CMPA
      200.0   ESDP
90/09  HIGH
90/09  HIGH
                                         SOLID
                                         WASTE
                                         SOLID
                                         WASTE
                        ADEQUATE   ADEQUATE   ADEQUATE
                         DESIGN    TIMING    ESTIMATE
                          NOT
                         AVAIL
 NOT
AVAIL
 NOT
AVAIL
                          90/09  HIGH    SOLID    ADEQUATE  ADEQUATE   ADEQUATE
                                         WASTE     DESIGN    TIMING    ESTIMATE

-------
                                  FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                          DEPARTMENT  OF ARMY                      ARMY MATERIAL COMMAND
                 PROJECT IDENTIFICATION
                                               REQ    EST   PROJECT
                            BUDGET     COMPL   COMPL  COMPL ASSESS- MEDIA
                          (THOUSANDS)  STATUS  DATE   DATE  MENT    TYPE
                                                                                               ARMY-68
                                                  ADEQUACY OF PROJECT
                                                 ENGIN-
                                                 EERING    TIME      COST
 AL-213820027 PROJECT:  AN0089S002
 UST REMEDIAL ACTION
 ACCT:  INDUSTRIAL  FUND
 ANNISTON ARMY DEPOT
 ANNISTON                        AL

 AL-213820027 PROJECT:  AN-SW-30
 CLOSE  EXCESS OBOD
 ACCT:  INDUSTRIAL  FUND
 ANNISTON ARMY DEPOT
 ANNISTON                        AL

 AL-213820027 PROJECT:  AN-SW-29
 INSTALL  OBOD 6W MON
 ACCT:  INDUSTRIAL FUND
 ANNISTON ARMY DEPOT
 ANNISTON                        AL
AL-213820027 PROJECT:
UPGRADE DEACT FURNACE
ACCT: INDUSTRIAL FUND
ANNISTON ARMY DEPOT
ANNISTON
AN-SW-32
- APE
           AL
AL-213820027 PROJECT: AN-SW-26
SWMU CLEANUP
ACCT: DERA - OMA (OPERATIONS AND MA
ANNISTON ARMY DEPOT
ANNISTON                         AL

AL-213820027 PROJECT: AN-SW-8
HAZMIN STUDY-REDUCTION OF HAZARDOUS WASTE GENER
ACCT: DERA - OMA (OPERATIONS AND MA
ANNISTON ARMY DEPOT
ANNISTON                         AL
                                                      250.0  ESDP
                                250.0  ESDF
                                200.0  ESDF
1,000.0  ESDF
                              2,000.0  ESDF
                                150.0   OTHR
                                                     90/09  HIGH     SOLID
                                                                    WASTE
                                                     90/09 MEDIUM   SOLID
                                                                    WASTE
                       90/09  HIGH     SOLID
                                      WASTE
90/09 MEDIUM   SOLID
               WASTE
                       90/09  MEDIUM   SOLID
                                     WASTE
                       90/09   LOW     SOLID
                                     WASTE
                                              ADEQUATE  ADEQUATE   ADEQUATE
                                               DESIGN    TIMING    ESTIMATE
                                              ADEQUATE  ADEQUATE   ADEQUATE
                                               DESIGN    TIMING    ESTIMATE
                                                                            ADEQUATE  ADEQUATE   ADEQUATE
                                                                             DESIGN    TIMING    ESTIMATE
                                              ADEQUATE  ADEQUATE   ADEQUATE
                                               DESIGN    TIMING    ESTIMATE
                        ADEQUATE   ADEQUATE    ADEQUATE
                         DESIGN    TIMING     ESTIMATE
                                                                            ADEQUATE  ADEQUATE   ADEQUATE
                                                                             DESIGN    TIMING    ESTIMATE

-------
                                 FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                         DEPARTMENT OF ARMY                      ARMY MATERIAL COMMAND
                PROJECT IDENTIFICATION
                     REQ    EST   PROJECT
  BUDGET     COMPL   COMPL  COMPL ASSESS- MEDIA
(THOUSANDS)  STATUS  DATE    DATE   MENT    TYPE
                                                                                                                     ARMY-69
                            ADEQUACY OF PROJECT
                          ENGIN-
                          EERING    TIME      COST
AL-213820027 PROJECT: AN-A-21
ASBESTOS HAZARD ABATEMENT PROGRAM
ACCT: DMA OPERATIONS t MAINT.ARMY
ANNISTON ARMY DEPOT
ANNISTON                         AL

AL-213820027 PROJECT: AN-SW-27
REVISE SPILL PLANS
ACCT: INDUSTRIAL FUND
ANNISTON ARMY DEPOT
ANNISTON                         AL

AL-213820027 PROJECT: AN-W-13
INSTALL GROUNDWATER TREATMENT  (3 SITES)
ACCT: DERA - OMA (OPERATIONS AND MA
ANNISTON ARMY DEPOT
ANNISTON                         AL

AL-213820742 PROJECT: RA-R-15
RADON SAMPLING AND EVALUATION
ACCT: OMA OPERATIONS i MAINT.ARMY
REDSTONE ARSENAL
HUNTSVILLE                       AL

AL-213820742 PROJECT: RA0089S007
RCRA FACILITY INVESTIGATION (RFI)
ACCT: DERA - OMA (OPERATIONS AND MA
REDSTONE ARSENAL
HUNTSVILLE                       AL

AL-213820742 PROJECT: RA0089S006
REMEDIAL ACTIONS FOR SMU SITES
ACCT: DERA - OMA (OPERATIONS AND MA
REDSTONE ARSENAL
HUNTSVILLE                       AL
       35.0  ESDF
      100.0  ESDF
90/09  LOW     TOXIC    ADEQUATE  ADEQUATE   ADEQUATE
             SUBSTANCE   DESIGN    TIMING    ESTIMATE
90/09 MEDIUM   WATER    ADEQUATE  ADEQUATE   ADEQUATE
                         DESIGN    TIMING    ESTIMATE
      100.0   ESDF    88/07   90/09  MEDIUM   WATER    ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
       10.0   OTHR    91/01   90/09 MEDIUM    AIR
    2,000.0   ESDP
    1,000.0   ESDF
90/09  HIGH    SOLID
               WASTE
                                                  ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
ADEQUATE  ADEQUATE   ADEQUATE
 DESIGN    TIMING    ESTIMATE
90/09 MEDIUM   SOLID    ADEQUATE  ADEQUATE   ADEQUATE
               WASTE     DESIGN    TIMING    ESTIMATE

-------
                                  FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                          DEPARTMENT OF ARMY                      ARMY MATERIAL COMMAND
                 PROJECT IDENTIFICATION
                     REQ    EST   PROJECT
  BUDGET     COMPL    COMPL  COMPL ASSESS- MEDIA
(THOUSANDS)   STATUS   DATE   DATE  MENT    TYPE
                                                                                                                      ARMY-70
  ADEQUACY OF PROJECT
ENGIN-
EERING    TIME      COST
 AL-213820742 PROJECT:  RA0089S004
 OB/CD AREA RENOVATIONS
 ACCT: DMA OPERATIONS & MAINT.ARMY
 REDSTONE ARSENAL
 HUNTSVILLE                      AL

 AL-213820742 PROJECT:  RA0089S008
 HAZARDOUS WASTE  DISPOSAL  FUNDING
 ACCT: DMA OPERATIONS & MAINT.ARMY
 REDSTONE ARSENAL
 HUNTSVILLE                      AL

 AL-2138207'+2 PROJECT:  RA-W-11
 PERFORM  LEAK TESTING ON UNDERGROUND TANKS
 ACCT:  DMA OPERATIONS & MAINT.ARMY
 REDSTONE  ARSENAL
 HUNTSVILLE                      AL

 AL-213S20742  PROJECT:  RA-A-14
 ASBESTOS  ABATEMENT REQUIREMENTS
 ACCT:  DMA OPERATIONS & MAINT,ARMY
 REDSTONE  ARSENAL
 HUNTSVILLE                       AL

 AL-213820742  PROJECT:  RA-A-8
 ASBESTOS  SAMPLE AND  ANALYSIS
 ACCT:  DMA  OPERATIONS & MAINT.ARMY
 REDSTONE  ARSENAL
 HUNTSVILLE                       AL

AL-213820742  PROJECT:  RA-W-6
REWORK/REPLACEOLDSEWER LINES AT STP-4 AREA
ACCT: DMA  OPERATIONS ft MAINT.ARMY
REDSTONE  ARSENAL
HUNTSVILLE                       AL
                                                      100.0  ESDF
                           90/09 MEDIUM   SOLID    ADEQUATE  ADEQUATE   ADEQUATE
                                         WASTE     DESIGN    TIMING    ESTIMATE
      637.0   ESDF    90/10   90/09 MEDIUM   SOLID    ADEQUATE  ADEQUATE   ADEQUATE
                                         WASTE     DESIGN    TIMING    ESTIMATE
       20.0   ESDF   89/12   90/09  HIGH    SOLID    ADEQUATE  ADEQUATE   ADEQUATE
                                         WASTE     DESIGN    TIMING    ESTIMATE
      876.0   ESDF    93/12   90/09   LOW     TOXIC    ADEQUATE  ADEQUATE   ADEQUATE
                                       SUBSTANCE   DESIGN    TIMING    ESTIMATE
       50.0  OTHR
      500.0   ESRO
                          90/09  LOW     TOXIC    ADEQUATE  ADEQUATE   ADEQUATE
                                       SUBSTANCE   DESIGN    TIMING    ESTIMATE
                          90/09 MEDIUM   WATER    ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE

-------
                                 FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                         DEPARTMENT OF ARMY                      ARMY MATERIAL COMMAND
                PROJECT IDENTIFICATION
                     REQ    EST   PROJECT
  BUDGET     COMPL   COMPL  COMPL ASSESS-  MEDIA
(THOUSANDS)  STATUS  DATE   DATE   MENT     TYPE
                                                                                                                     ARMY-71
                            ADEQUACY OF  PROJECT
                          ENGIN-
                          EERING    TIME      COST
AR-213820707 PROJECT: PB-SF-10
GEOTECHNICAL DATA EVALUATION
ACCT: INDUSTRIAL FUND
PINE BLUFF ARSENAL
PINE BLUFF                       AR

AR-213820707 PROJECT: PB-SF-9
GROUNDWATER MONITORING
ACCT: INDUSTRIAL FUND
PINE BLUFF ARSENAL
PINE BLUFF                       AR

AR-213820707 PROJECT: PB0089S001
DEMIL/DISPOSAL OF CHEMICAL DEFENSE EQUIPMENT
ACCT: DMA OPERATIONS & MAINT.ARMY
PINE BLUFF ARSENAL
PINE BLUFF                       AR

AR-213820707 PROJECT: PB0089S009
REPLACE PCB TRANSFORMERS
ACCT: DMA OPERATIONS & MAINT.ARMY
PINE BLUFF ARSENAL
PINE BLUFF                       AR

AR-213820707 PROJECT: PB0089S013
TOXICITY REDUCTION EVALUATION (TRE)
ACCT: INDUSTRIAL FUND
PINE BLUFF ARSENAL
PINE BLUFF                       AR

AR-213820707 PROJECT: PB-TS-3
GROUNDWATER DATA BASE
ACCT: INDUSTRIAL FUND
PINE BLUFF ARSENAL
PINE BLUFF                       AR
       25.0  OTHR   85/10  90/09  LOW
       60.0  OTHR   84/10   90/09  LOW
                                          CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
               CERCLA   ADEQUATE  ADEQUATE    ADEQUATE
                         DESIGN    TIMING    ESTIMATE
    2,000.0  ESDP
90/09  HIGH    SOLID    ADEQUATE   ADEQUATE    ADEQUATE
               WASTE     DESIGN    TIMING    ESTIMATE
      202.0   ESDP   90/09   90/09  HIGH    TOXIC    ADEQUATE  OVERDUE    ADEQUATE
                                       SUBSTANCE   DESIGN    TIMING    ESTIMATE
      110.0   ESDF    90/01   90/09 MEDIUM   WATER    ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
       30.0   OTHR    93/10   90/09   LOW     WATER    ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE

-------
                                  FEDERAL  AGENCY  POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                          DEPARTMENT OF  ARMY                      ARMY MATERIAL COMMAND
                 PROJECT IDENTIFICATION
                     REQ    EST    PROJECT
  BUDGET     COMPL   COMPL   COMPL  ASSESS- MEDIA
(THOUSANDS)   STATUS  DATE    DATE   MENT    TYPE
                                                                     ARMY-72
                            ADEQUACY OF PROJECT
                          ENGIN-
                          EERING    TIME      COST
 AZ-213820635 PROJECT:  NA-A-12
 ASBESTOS ABATEMENT PROJECT
 ACCT:  OMA OPERATIONS & MAINT,ARMY
 NAVAJO DEPOT ACTIVITY
 BELLEMOUNT                      AZ

 AZ-213820635 PROJECT:  NA-A-14
 RADON  ABATEMENT PROJECTS
 ACCT:  OMA OPERATIONS & MAINT.ARMY
 NAVAJO DEPOT ACTIVITY
 BELLEMOUNT                      AZ

 AZ-213820635 PROJECT:  NA0089S002
 RADON  SURVEYS
 ACCT:  INDUSTRIAL FUND
 NAVAJO DEPOT ACTIVITY
 BELLEMOUNT                      AZ

 AZ-213820635 PROJECT:  NA0089S003
 HAZARDOUS WASTE DISPOSAL
 ACCT:  OMA OPERATIONS & MAINT.ARMY
 NAVAJO DEPOT ACTIVITY
 BELLEMOUNT                       AZ

 AZ-213820635 PROJECT; NA-SW-21
 TEST/CERTIFY/REMOVE/REMEDIATE UST'S
 ACCT:  INDUSTRIAL FUND
 NAVAJO  DEPOT ACTIVITY
 BELLEMOUNT                       AZ

 AZ-213820635 PROJECT: NA-SW-23
 RCRA FACILITY INVESTIGATION (RFI)
ACCT: DERA - OMA (OPERATIONS AND MA
NAVAJO  DEPOT ACTIVITY
BELLEMOUNT                       AZ
                                                      350.0  ESDF
      171.0   ESDF
        5.0   ESDF
       35.0   CMPA
       24.0   ESDP
   3,000.0  ESDF
                           90/09 MEDIUM    AIR
90/09 MEDIUM    AIR
                           90/09 MEDIUM    AIR
90/09  HIGH    SOLID
               WASTE
90/09  HIGH    SOLID
               WASTE
90/09 MEDIUM   SOLID
               WASTE
                                                  ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
                                                  ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
                                                  ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
                                                  ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
                                                  ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
ADEQUATE  ADEQUATE   ADEQUATE
 DESIGN    TIMING    ESTIMATE

-------
                                 FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                         DEPARTMENT OF ARMY                      ARMY MATERIAL COMMAND
                PROJECT IDENTIFICATION
                     REQ    EST   PROJECT
  BUDGET     COMPL   COMPL  COMPL ASSESS-  MEDIA
(THOUSANDS)  STATUS  DATE   DATE   MENT     TYPE
                                                                                                                     ARMY-73
                            ADEQUACY OF PROJECT
                          ENGIN-
                          EERING    TIME      COST
AZ-213820635 PROJECT: NA-SW-6
CLOSE DEACTIVATION FURNACE, APE 1236
ACCT: INDUSTRIAL FUND
NAVAJO DEPOT ACTIVITY
BELLEMOUNT                       AZ

AZ-213S20635 PROJECT: NA0089S005
DEFINE & REMEDIATE DIESEL SPILL-DEACT FURN
ACCT: DMA OPERATIONS & MAINT.ARMY
NAVAJO DEPOT ACTIVITY
BELLEMOUNT                       AZ

AZ-213820635 PROJECT: NA-SW-7
INSTALL CO ANALYZER ON DEAC FURNACE APE 1236
ACCT: INDUSTRIAL FUND
NAVAJO DEPOT ACTIVITY
BELLEMOUNT                       AZ

AZ-213820635 PROJECT: NA-TS-10
PCB MANAGEMENT
ACCT: INDUSTRIAL FUND
NAVAJO DEPOT ACTIVITY
BELLEMOUNT                       AZ

AZ-213820991 PROJECT: YU0089S001
SAMPLE i, ANALYZE DRINKING WATER
ACCT: RDT & E
YUMA PROVING GROUND
YUMA                             AZ

AZ-213820991 PROJECT: YU0089S016
BOTTLED WATER
ACCT: RDT & E
YUMA PROVING GROUND
YUMA                             AZ
        5.0  ESDF   89/11   90/09 MEDIUM    SOLID
                                          WASTE
        3.0  ESDF
    1,000.0   OTHR
        5.0   ESDP
       10.0   ESDP
       80.0   ESDF
                           90/09  MEDIUM    SOLID
                                          WASTE
                        ADEQUATE  ADEQUATE   ADEQUATE
                         DESIGN    TIMING    ESTIMATE
                        ADEQUATE  ADEQUATE   ADEQUATE
                         DESIGN    TIMING    ESTIMATE
90/09  LOW     SOLID    ADEQUATE  ADEQUATE   ADEQUATE
               WASTE     DESIGN    TIMING    ESTIMATE
90/09  HIGH    TOXIC    ADEQUATE  ADEQUATE    ADEQUATE
             SUBSTANCE   DESIGN    TIMING    ESTIMATE
                           90/09  HIGH   DRINKING  ADEQUATE  ADEQUATE   ADEQUATE
                                         WATER     DESIGN    TIMING    ESTIMATE
90/09 MEDIUM  DRINKING  ADEQUATE   ADEQUATE   ADEQUATE
               WATER     DESIGN    TIMING    ESTIMATE

-------
                                  FEDERAL  AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                          DEPARTMENT OF  ARMY                      ARMY MATERIAL COMMAND
                 PROJECT IDENTIFICATION
                     REQ     EST   PROJECT
  BUDGET     COMPL    COMPL   COMPL ASSESS- MEDIA
(THOUSANDS)   STATUS   DATE    DATE  MENT    TYPE
                                                                     ARMY-
                            ADEQUACY  OF  PROJECT
                          ENGIN-
                          EERING   TIME     COST
 AZ-213820991 PROJECT:  YU0089S017
 ARCHEOLOGICAL SURVEY & HPP PREP
 ACCT:  RDT & E
 YUMA PROVING GROUND
 YUMA                            AZ

 AZ-213820991 PROJECT:  YU0089S012
 SAMPLE & ANALYZE  DU IN THE ENVIRONMENT
 ACCT:  RDT & E
 YUMA PROVING GROUND
 YUMA                            AZ

 AZ-213820991  PROJECT:  YU-SW-15
 ANALYSIS &  SAMPLE HAZD  WASTE
 ACCT:  RDT & E
 YUMA PROVING  GROUND
 YUMA                            AZ

 AZ-213820991  PROJECT: YUOOS9S013
 HAZARDOUS WASTE DISPOSAL
 ACCT:  RDT & E
 YUMA PROVING  GROUND
 YUMA                            AZ

 AZ-213820991  PROJECT: YU0089S003
 UNDERGROUND STORAGE TANK MONITORING
 ACCT:  RDT & E
 YUMA PROVING  GROUND
 YUMA                             AZ

AZ-213820991  PROJECT: YU0089S004
UST  UPGRADE & REPLACEMENT
ACCT: RDT & E
YUMA PROVING GROUND
YUMA                             AZ
                                                      135.0  ESDF
       80.0   ESDP
       50.0   ESDP
      160.0   ESDP
       25.0   ESDF
      170.0   ESDF
                           90/09 MEDIUM  MULTI
                                        MEDIA
                          NOT
                         AVAIL
 NOT
AVAIL
 NOT
AVAIL
                           90/09  HIGH  RADIATION  ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
                          90/09  HIGH
                          90/09  HIGH
                                         SOLID
                                         WASTE
                                         SOLID
                                         WASTE
90/09 MEDIUM   SOLID
               WASTE
                          90/09 MEDIUM   SOLID
                                         WASTE
                        ADEQUATE   ADEQUATE    ADEQUATE
                         DESIGN    TIMING     ESTIMATE
                        ADEQUATE  ADEQUATE    ADEQUATE
                         DESIGN    TIMING    ESTIMATE
                                                  ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
                        ADEQUATE  ADEQUATE   ADEQUATE
                         DESIGN    TIMING    ESTIMATE

-------
                                 FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR  1991

                         DEPARTMENT OF ARMY                      ARMY MATERIAL COMMAND
                PROJECT IDENTIFICATION
                     REQ    EST   PROJECT
  BUDGET     COMPL   COMPL  COMPL ASSESS- MEDIA
(THOUSANDS)  STATUS  DATE   DATE   MENT    TYPE
                                                                                                                     ARMY-75
                            ADEQUACY OF  PROJECT
                          ENGIN-
                          EERING    TIME      COST
AZ-213820991 PROJECT: YU0089S006
SWMU REMEDIAL ACTION
ACCT: DERA - DMA (OPERATIONS AND MA
YUMA PROVING GROUND
YUMA                             AZ

AZ-213820991 PROJECT: YU0089S010
HAZMIN PROJECTS
ACCT: DERA - OMA (OPERATIONS AND MA
YUMA PROVING GROUND
YUMA                             AZ

AZ-213820991 PROJECT: YU0089S011
CONTAINMENT SYSTEMS
ACCT: DERA - OMA (OPERATIONS AND MA
YUMA PROVING GROUND
YUMA                             AZ

AZ-213820991 PROJECT: YU0089S014
SAMPLE t ANALYZE ASBESTOS
ACCT: ROT & E
YUMA PROVIN3 GROUND
YUMA                             AZ

AZ-213820991 PROJECT: YU0089S015
ASBESTOS ABATEMENT
ACCT: RDT & E
YUMA PROVING GROUND
YUMA                             AZ

AZ-213820991 PROJECT: YU0089S007
PCB TRANSFORMER REMOVAL
ACCT: RDT & E
YUMA PROVING GROUND
YUMA                             AZ
      100.0  ESDF
      100.0   ESDL
       20.0  ESDL
       10.0  ESDP
      225.0   ESDP
      230.0   ESDF
90/09 MEDIUM   SOLID
               WASTE
90/10  LOW     SOLID
               WASTE
ADEQUATE  ADEQUATE   ADEQUATE
 DESIGN    TIMING    ESTIMATE
ADEQUATE  ADEQUATE   ADEQUATE
 DESIGN    TIMING    ESTIMATE
90/09  LOW     SOLID    ADEQUATE  ADEQUATE    ADEQUATE
               WASTE     DESIGN    TIMING     ESTIMATE
90/09  HIGH    TOXIC    ADEQUATE   ADEQUATE   ADEQUATE
             SUBSTANCE   DESIGN    TIMING    ESTIMATE
90/09  HIGH    TOXIC    ADEQUATE  ADEQUATE   ADEQUATE
             SUBSTANCE    DESIGN    TIMING    ESTIMATE
90/09 MEDIUM   TOXIC     ADEQUATE  ADEQUATE   ADEQUATE
             SUBSTANCE   DESIGN    TIMING    ESTIMATE

-------
                                  FEDERAL ASENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                          DEPARTMENT  OF  ARMY                      ARMY MATERIAL COMMAND
                 PROJECT IDENTIFICATION
                     REQ     EST   PROJECT
  BUDGET     COMPL    COMPL   COMPL ASSESS- MEDIA
(THOUSANDS)   STATUS   DATE    DATE  MENT    TYPE
                                                                     ARMY-76
                            ADEQUACY OF  PROJECT
                          ENGIN-
                          EERING    TIME     COST
 CA-213820759 PROJECT:  RB-A-29
 ACT'D CARBON ABSORPTION SYS  FOR  LN2,  184
 ACCT:  MILCON.ARMY  (MCA)
 RIVERBANK ARMY  AMMO PLT
 RIVERBANK                       CA

 CA-213820759 PROJECT:  RB-SF-32
 INSTALLATION RESTORATION RI/FS&RA
 ACCT:  DERA - OMA (OPERATIONS AND MA
 RIVERBANK ARMY  AMMO PLT
 RIVERBANK                       CA

 CA-213820759 PROJECT:  RB-SW-30
 CONTAMINATION CLEAN-UP PERCOLATION PONDS
 ACCT:  DERA - OMA (OPERATIONS AND MA
 RIVERBANK ARMY  AMMO PLT
 RIVERBANK                       CA

 CA-213820759 PROJECT:  RB-SW-34
 LUBE ROOM SPILL CONTAINMENT COVER AND ADD'L PLA
 ACCT:  PAA(PEMA)
 RIVERBANK  ARMY AMMO PLT
 RIVERBANK                        CA

 CA-213820759  PROJECT:  RB-SW-36
 FILTER CAKE  HANDLING SYSTEM
 ACCT:  PAA(PEMA)
 RIVERBANK  ARMY AMMO  PLT
RIVERBANK                        CA

CA-213820759  PROJECT: RB-W-24
SPILL CONTAINMENT-METAL CHIPS AND TURNINGS
ACCT: PAA(PEMA)
RIVERBANK ARMY AMMO  PLT
RIVERBANK                        CA
                                                      902.0  ESDF
    2,200.0   ESDF
                           90/09 MEDIUM    AIR     ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
90/09 MEDIUM   CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
                         DESIGN    TIMING    ESTIMATE
    6,000.0   ESDP   80/06  90/09  HIGH    SOLID
                                         WASTE
      54.0   ESDF
      107.0  ESDL
      34.0  ESDP
                          90/09 MEDIUM   SOLID
                                         WASTE
                        ADEQUATE   ADEQUATE   ADEQUATE
                         DESIGN    TIMING    ESTIMATE
                        ADEQUATE  ADEQUATE   ADEQUATE
                         DESIGN     TIMING    ESTIMATE
                          90/09  LOW     SOLID    ADEQUATE  ADEQUATE   ADEQUATE
                                         WASTE     DESIGN    TIMING    ESTIMATE
                          90/09  HIGH    WATER    ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE

-------
                                  FEDERAL AGENCY  POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                         DEPARTMENT OF ARMY                      ARMY MATERIAL COMMAND
                PROJECT IDENTIFICATION
                     REQ    EST   PROJECT
  BUDGET     COMPL   COMPL  COMPL ASSESS-  MEDIA
(THOUSANDS)  STATUS  DATE   DATE   MENT     TYPE
                                                                                                                      ARMY-77
                            ADEQUACY OF PROJECT
                          ENGIN-
                          EERING    TIME      COST
CA-213820759 PROJECT: RB0089S003
SPILL CONTAINMENT, STORM RESERVOIR PONDS
ACCT: PAA(PEMA)
RIVERBANK ARMY AMMO PLT
RIVERBANK                        CA

CA-213820759 PROJECT: RB0089S001
REGRADE AND REPAVE IWTP AREA
ACCT: PAA(PEMA)
RIVERBANK ARMY AMMO PLT
RIVERBANK                        CA

CA-213820780 PROJECT: SC-A-26
RADON SURVEYS
ACCT: INDUSTRIAL FUND
SACRAMENTO ARMY DEPOT
SACRAMENTO                       CA

CA-213820780 PROJECT: SC-A-27
RADON ABATEMENT PROJECTS
ACCT: OMA OPERATIONS & MAINT.ARMY
SACRAMENTO ARMY DEPOT
SACRAMENTO                       CA

CA-213820780 PROJECT: SC0089S004
NOX AIR EMISSIONS CONTROL PROJECT
ACCT: OMA OPERATIONS & MAINT,ARMY
SACRAMENTO ARMY DEPOT
SACRAMENTO                       CA

CA-213820780 PROJECT: SC0089S027
CONDUCT INDOR AIR POLLUTION BASELINE STUDY
ACCT: INDUSTRIAL FUND
SACRAMENTO ARMY DEPOT
SACRAMENTO                       CA
      113.0  ESDF
      285.0   OTHR
       35.0   ESDF
       23.0   ESDF
                           90/09 MEDIUM   WATER
                           90/09   LOW     MATER
                           90/09 MEDIUM    AIR
90/09 MEDIUM    AIR
      200.0   PSDF    91/12   90/12 MEDIUM    AIR
       50.0   ESDL
91/04  LOW      AIR
                                                  ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
                                                  ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
                                                  ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
                                                  ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
                        ADEQUATE   ADEQUATE   ADEQUATE
                         DESIGN    TIMING    ESTIMATE
                                                  ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE

-------
                                  FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                          DEPARTMENT OF ARMY                      ARMY MATERIAL COMMAND
                 PROJECT IDENTIFICATION
                     REQ     EST   PROJECT
  BUDGET     COMPL    COMPL   COMPL ASSESS- MEDIA
(THOUSANDS)   STATUS   DATE    DATE  MENT    TYPE
                                                                     ARMY-78
   ADEQUACY OF PROJECT
 ENGIN-
 EERING    TIME      COST
 CA-213820780 PROJECT:  SC0089S030
 EVALUATE CONDITION OF  DEPOT  DW SYSTEM
 ACCT:  INDUSTRIAL FUND
 SACRAMENTO ARMY DEPOT
 SACRAMENTO                      CA

 CA-213820780 PROJECT:  SC0089S029
 CONDUCT MULTIMEDIA ENV AUDIT
 ACCT:  INDUSTRIAL FUND
 SACRAMENTO ARMY DEPOT
 SACRAMENTO                      CA

 CA-213820780 PROJECT:  SC0089S031
 IRP  FIREFUGHTER TRAINING AREA
 ACCT:  DERA - OMA (OPERATIONS AND MA
 SACRAMENTO ARMY DEPOT
 SACRAMENTO                      CA

 CA-213820780 PROJECT:  SC0089S032
 IRP  BLDG  300 BURN  PITS
 ACCT:  DERA - OMA (OPERATIONS AND MA
 SACRAMENTO ARMY DEPOT
 SACRAMENTO                      CA

 CA-213820780  PROJECT: SC0089S033
 IRP  PESTICIDE RINSE AREA
 ACCT:  DERA  -  OMA (OPERATIONS AND MA
 SACRAMENTO  ARMY  DEPOT
 SACRAMENTO                       CA

CA-213820780  PROJECT: SC0089S034
 IRP BATTERY  DISPOSAL WELL
ACCT: DERA  -  OMA (OPERATIONS AND MA
SACRAMENTO ARMY DEPOT
SACRAMENTO                       CA
                                                       50.0  ESRO
      100.0   ESRO
                           91/01   LOW    DRINKING  ADEQUATE  ADEQUATE   ADEQUATE
                                         WATER     DESIGN    TIMING    ESTIMATE
                           91/04   LOW    MULTI
                                        MEDIA
 NOT
AVAIL
 NOT
AVAIL
      150.0  CMPA   96/08  95/04  HIGH
      200.0  CMPA   96/08  95/04  HIGH
 NOT
AVAIL
      250.0   CMPA    96/08   95/04  HIGH    CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
      250.0   CMPA    96/08  95/04  HIGH    CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
                                         CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
                                         CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE

-------
                                 FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR  1991

                         DEPARTMENT OF ARMY                      ARMY MATERIAL COMMAND
                PROJECT IDENTIFICATION
                     REQ    EST    PROJECT
  BUDGET     COMPL   COMPL  COMPL  ASSESS- MEDIA
(THOUSANDS)  STATUS  DATE    DATE   MENT    TYPE
                                                                                                                     ARMY-79
             ADEQUACY OF PROJECT
           ENGIN-
           EERING    TIME      COST
CA-213820780 PROJECT: SC0089S035
IRP 1950'S DISPOSAL TRENCHES
ACCT: DERA - OMA (OPERATIONS AND MA
SACRAMENTO ARMY DEPOT
SACRAMENTO                       CA

CA-213820780 PROJECT: SC0089S036
IRP 1960'S DISPOSAL TRENCHES
ACCT: DERA - OMA (OPERATIONS AND MA
SACRAMENTO ARMY DEPOT
SACRAMENTO                       CA

CA-213820780 PROJECT: SC0089S037
IRP BLDG 315 CYANIDE SUMP
ACCT: DERA - OMA (OPERATIONS AND MA
SACRAMENTO ARMY DEPOT
SACRAMENTO                       CA

CA-213820780 PROJECT: SC0089S038
IRP BLDG 316 ACID SUMP B
ACCT: DERA - OMA (OPERATIONS AND MA
SACRAMENTO ARMY DEPOT
SACRAMENTO                       CA

CA-213820780 PROJECT: SC0089S039
IRP 1950'S LAGOON
ACCT: DERA - OMA (OPERATIONS AND MA
SACRAMENTO ARMY DEPOT
SACRAMENTO                       CA

CA-213820780 PROJECT: SC0089S040
IRP BLDS 382
ACCT: OERA - OMA (OPERATIONS AND MA
SACRAMENTO ARMY DEPOT
SACRAMENTO                       CA
      250.0  CMPA   96/08  95/04  HIGH
      250.0  CMPA   96/08   95/04  HIGH
CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
          DESIGN    TIMING    ESTIMATE
CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
          DESIGN    TIMING    ESTIMATE
       50.0   CMPA   96/08   95/04  HIGH    CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
       50.0  CMPA   96/08   95/04  HIGH    CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
       50.0   CMPA   96/08   95/04  HIGH
       50.0   CMPA    96/08   95/04  HIGH
                                         CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
                                         CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE

-------
                                  FEDERAL  AGENCY  POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                          DEPARTMENT  OF ARMY                      ARMY MATERIAL COMMAND
                 PROJECT IDENTIFICATION
                     REQ    EST    PROJECT
  BUDGET     COMPL   COMPL   COMPL  ASSESS- MEDIA
(THOUSANDS)   STATUS  DATE    DATE   MENT    TYPE
                                                                     ARMY-80
    ADEQUACY OF PROJECT
  ENGIN-
  EERING    TIME      COST
 CA-213820780 PROJECT:  SC0089S041
 IRP WASTE PAINT AND  OIL  DUMP  AREA
 ACCT:  DERA - DMA (OPERATIONS  AND MA
 SACRAMENTO ARMY DEPOT
 SACRAMENTO                      CA

 CA-213820780 PROJECT:  SC0089S042
 IRP OUTDOOR WASTE  STORAGE AREA BLDG 41
 ACCT:  DERA - DMA (OPERATIONS  AND MA
 SACRAMENTO ARMY DEPOT
 SACRAMENTO                      CA

 CA-213820780 PROJECT:  SC0089S043
 IRP OLD MORRISON CREEK
 ACCT:  DERA - OMA (OPERATIONS  AND MA
 SACRAMENTO ARMY DEPOT
 SACRAMENTO                      CA

 CA-213820780 PROJECT:  SC0089S044
 IRP  OLD SW FILL AREA
 ACCT:  DERA - OMA (OPERATIONS  AND MA
 SACRAMENTO ARMY DEPOT
 SACRAMENTO                      CA

 CA-213820780  PROJECT:  SC0089S045
 IRP  BLDG 348 N  CONTRACTOR STORAGE AREA
 ACCT:  DERA  -  OMA (OPERATIONS  AND MA
 SACRAMENTO  ARMY DEPOT
 SACRAMENTO                       CA

CA-213820780  PROJECT:  SC0089S046
 IRP BLDG 320 CYANIDE LEACH FIELD
ACCT: DERA  - OMA (OPERATIONS AND MA
SACRAMENTO  ARMY DEPOT
SACRAMENTO                       CA
                                                      100.0  CMPA   96/08  95/04  HIGH    CERCLA
       50.0   CMPA   96/08   95/04  HIGH    CERCLA
       25.0   CMPA    96/08   95/04  HIGH    CERCLA
       25.0  CMPA    96/08  95/04  HIGH    CERCLA
       50.0   CMPA   97/08  95/04  HIGH    CERCLA
       25.0  CMPA   96/08  95/04  HIGH    CERCLA
                                                  ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
                                                  ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
                                                  ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
                                                  ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
ADEQUATE  ADEQUATE   ADEQUATE
 DESIGN    TIMING    ESTIMATE
ADEQUATE  ADEQUATE   ADEQUATE
 DESIGN    TIMING    ESTIMATE

-------
                                  FEDERAL AGENCY  POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                          DEPARTMENT  OF ARMY                      ARMY MATERIAL COMMAND
                PROJECT IDENTIFICATION
                     REQ    EST    PROJECT
  BUDGET     COMPL   COMPL  COMPL  ASSESS- MEDIA
(THOUSANDS)  STATUS  DATE    DATE   MENT    TYPE
                                                                                                                      ARMY-61
                            ADEQUACY OF  PROJECT
                          ENGIN-
                          EERING    TIME      COST
CA-213820780 PROJECT: SC0089S047
IRP 5000 GALLON HW TANK SITE
ACCT: DERA - DMA  (OPERATIONS AND MA
SACRAMENTO ARMY DEPOT
SACRAMENTO                       CA

CA-213820780 PROJECT: SC0089S048
IRP COE SI&A
ACCT: DERA - DMA  (OPERATIONS AND MA
SACRAMENTO ARMY DEPOT
SACRAMENTO                       CA

CA-213820780 PROJECT: SC0089S049
IRP SAAD PROGRAM  MGT COSTS
ACCT: DERA - DMA  (OPERATIONS AND MA
SACRAMENTO ARMY DEPOT
SACRAMENTO                       CA

CA-213820780 PROJECT: SC0089S050
IRP SAAD STATE TECHNICAL ASSIST COST
ACCT: DERA - OMA  (OPERATIONS AND MA
SACRAMENTO ARMY DEPOT
SACRAMENTO                       CA

CA-213820780 PROJECT: SC0089S012
IRP OFFPOST IRA
ACCT: DERA - OMA  (OPERATIONS AND MA
SACRAMENTO ARMY DEPOT
SACRAMENTO                       CA

CA-213820780 PROJECT: SC0089S013
IRP OXYDATION LAGON
ACCT: DERA - OMA  (OPERATIONS AND MA
SACRAMENTO ARMY DEPOT
SACRAMENTO                       CA
       50.0  CMPA   96/08  95/04  HIGH    CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
      150.0   CMPA   96/08   95/04  HIGH
      120.0   CMPA   96/08   95/04  HIGH
       75.0   CMPA    96/08   95/04  HIGH
       20.0   CMPA
90/09  HIGH
                                         CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
               CERCLA   ADEQUATE   ADEQUATE   ADEQUATE
                         DESIGN    TIMING    ESTIMATE
                                         CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
CERCLA   ADEQUATE  ADEQUATE    ADEQUATE
          DESIGN    TIMING    ESTIMATE
    1,500.0  CMPA    92/09  91/10  HIGH    CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE

-------
                                  FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                          DEPARTMENT  OF  ARMY                      ARMY MATERIAL COMMAND
                 PROJECT IDENTIFICATION
                    REQ    EST   PROJECT
  BUDGET     COMPL   COMPL  COMPL ASSESS- MEDIA
(THOUSANDS)   STATUS  DATE   DATE  MENT    TYPE
                                                                                                                     ARMY-82
                            ADEQUACY  OF  PROJECT
                          ENGIN-
                          EERING    TIME     COST
 CA-213820780 PROJECT:  SC-SF-14
 PUBLIC DRINKING WATER  SOURCE
 ACCT:  DERA - OMA (OPERATIONS  AND MA
 SACRAMENTO ARMY DEPOT
 SACRAMENTO                      CA

 CA-213820780 PROJECT:  SC-SF-15
 IRP ONPOST GM IRA
 ACCT:  DERA - OMA (OPERATIONS  AND MA
 SACRAMENTO ARMY DEPOT
 SACRAMENTO                      CA

 CA-213820780 PROJECT:  SC-SF-16
 IRP BURN  PITS
 ACCT:  DERA - OMA (OPERATIONS  AND MA
 SACRAMENTO ARMY DEPOT
 SACRAMENTO                      CA

 CA-213820780  PROJECT:  SC-SF-17
 IRP  TANK  82  - RESTORATION & MONITORING
 ACCT:  DERA  -  OMA  (OPERATIONS  AND MA
 SACRAMENTO ARMY DEPOT
 SACRAMENTO                       CA

 CA-213820780  PROJECT:  SC-SF-12
 IRP  GW WELL CONSTRUCTION SAMPLING ANALYSIS
 ACCT: DERA - OMA  (OPERATIONS  AND MA
 SACRAMENTO ARMY DEPOT
 SACRAMENTO                       CA

CA-213820780 PROJECT: SC-SW-22
HAZARDOUS WASTE DISPOSAL
ACCT: INDUSTRIAL FUND
SACRAMENTO ARMY DEPOT
SACRAMENTO                       CA
       35.0   CMPA   69/01  90/09  HIGH    CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
      250.0   CMPA   89/10  90/09  HIGH    CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
    2,000.0  CMPA   92/08  91/09  HIGH    CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
    2,000.0  CMPA   92/05  91/06  HIGH    CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
      400.0  CMPA
     645.0  CMPA
90/09  HIGH    CERCLA   ADEQUATE   ADEQUATE    ADEQUATE
                         DESIGN    TIMING     ESTIMATE
                          95/04. HIGH    SOLID    ADEQUATE  ADEQUATE   ADEQUATE
                                         WASTE     DESIGN    TIMING    ESTIMATE

-------
                                 FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                         DEPARTMENT OF ARMY                      ARMY MATERIAL COMMAND
                PROJECT IDENTIFICATION
                     REQ    EST   PROJECT
  BUDGET     COMPL   COMPL  COMPL  ASSESS- MEDIA
(THOUSANDS)   STATUS  DATE    DATE   MENT    TYPE
                                                                                                                     ARMY-83
                            ADEQUACY OF PROJECT
                          ENGIN-
                          EERING    TIME      COST
CA-213820780 PROJECT: SC0089S023
REMOVE REPAIR REPLACE UG HM STORAGE TANKS
ACCT: INDUSTRIAL FUND
SACRAMENTO ARMY DEPOT
SACRAMENTO                       CA

CA-213820780 PROJECT: SC0089S002
HAZMIN - BULK PLATING WASTE TREATMT CONSTR
ACCT: MILCON.ARMY (MCA)
SACRAMENTO ARMY DEPOT
SACRAMENTO                       CA

CA-213820780 PROJECT: SC-TS-2
UNDERGROUND HAZMAT TANK STORAGE CERTIFICATION
ACCT: INDUSTRIAL FUND
SACRAMENTO ARMY DEPOT
SACRAMENTO                       CA

CA-213820780 PROJECT: SC-A-25
ASBESTOS ABATEMENT PROJECT
ACCT: DMA OPERATIONS t MAINT.ARMY
SACRAMENTO ARMY DEPOT
SACRAMENTO                       CA

CA-213820780 PROJECT: SC0089S014
DESIGN CONSTRUCT SLUDGE DEWATERING SYSTEM
ACCT: INDUSTRIAL FUND
SACRAMENTO ARMY DEPOT
SACRAMENTO                       CA

CA-213820780 PROJECT: SC0089S016
REPAIR/REPLACE CLARIFIER MIXERS BLDG 301
ACCT: INDUSTRIAL FUND
SACRAMENTO ARMY DEPOT
SACRAMENTO                       CA
       75.0  CMPA
90/12 MEDIUM   SOLID
               WASTE
      100.0  PSDF   92/12   91/12  MEDIUM    SOLID
                                          WASTE
ADEQUATE  ADEQUATE   ADEQUATE
 DESIGN    TIMING    ESTIMATE
                        ADEQUATE  ADEQUATE   ADEQUATE
                         DESIGN    TIMING    ESTIMATE
       50.0  ESDF    90/01   90/11  MEDIUM   TOXIC    ADEQUATE  ADEQUATE   ADEQUATE
                                       SUBSTANCE   DESIGN    TIMING    ESTIMATE
      124.0  ESDL
       75.0   ESRO
       50.0   ESRO
90/09  LOW     TOXIC    ADEQUATE   ADEQUATE    ADEQUATE
             SUBSTANCE   DESIGN    TIMING     ESTIMATE
                           90/12   LOW     WATER    ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
90/11  LOW     WATER    ADEQUATE   ADEQUATE   ADEQUATE
                         DESIGN     TIMING    ESTIMATE

-------
                                  FEDERAL AGENCY  POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                          DEPARTMENT OF ARMY                      ARMY MATERIAL COMMAND
                 PROJECT IDENTIFICATION
                     REQ    EST    PROJECT
  BUDGET     COMPL   COMPL   COMPL  ASSESS- MEDIA
(THOUSANDS)   STATUS   DATE    DATE   MENT    TYPE
                                                                     ARMY-84
  ADEQUACY OF PROJECT
ENGIN-
EERING    TIME      COST
 CA-213820760 PROJECT:  SC0089S017
 REPAIR AND SEAL IWTP TRENCHES  AND  CONCRETE
 ACCT:  OMA OPERATIONS & MAINT.ARMY
 SACRAMENTO ARMY DEPOT
 SACRAMENTO                      CA

 CA-213820780 PROJECT:  SC0089S020
 INSPECT DEPOT SANITARY SEWER SYSTEM
 ACCT:  INDUSTRIAL FUND
 SACRAMENTO ARMY DEPOT
 SACRAMENTO                      CA

 CA-213820832 PROJECT:  SH0089S005
 RADON  SURVEYS
 ACCT:  INDUSTRIAL FUND
 SHARPE  ARMY  DEPOT
 STOCKTON                         CA
CA-213820832 PROJECT: SH-A-22
RADON ABATEMENT PROJECTS
ACCT: INDUSTRIAL FUND
SHARPE ARMY DEPOT
STOCKTON
                                 CA
CA-213820832 PROJECT: SH0089S008
AIR EMISSIONS INVENTORY PER CA REGULATIONS
ACCT: INDUSTRIAL FUND
SHARPE ARMY DEPOT
STOCKTON                         CA

CA-213820832 PROJECT: SH-DW-24
REPAIR WATER SYSTEM CROSS-CONNECTION DEFICIENCY
ACCT: INDUSTRIAL FUND
SHARPE ARMY DEPOT
STOCKTON                         CA
                                                       100.0  ESRO
       80.0   ESRO
       17.0   ESDF
      138.0   ESDF
      50.0  PSDF
      25.0  INOV
                           90/10   LOW     WATER    ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
                           90/12   LOW     WATER    ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
                           90/09 MEDIUM    AIR     ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
                          90/09 MEDIUM    AIR     ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
                          90/09 MEDIUM    AIR     ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
                          90/09  HIGH   DRINKING  ADEQUATE  ADEQUATE   ADEQUATE
                                         WATER     DESIGN    TIMING    ESTIMATE

-------
                                 FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                         DEPARTMENT OF ARMY                      ARMY MATERIAL COMMAND
                PROJECT IDENTIFICATION
                     REQ    EST   PROJECT
  BUDGET     COMPt   COMPL  COMPL ASSESS- MEDIA
(THOUSANDS)  STATUS  DATE   DATE   MENT    TYPE
                                                                                                                     ARMY-85
                            ADEQUACY OF PROJECT
                          ENGIN-
                          EERING    TIME      COST
CA-213820832 PROJECT: SH-DW-11
REPLACE DRINKING WATER WELL
ACCT: INDUSTRIAL FUND
SHARPE ARMY DEPOT
STOCKTON
                                 CA
CA-213820832 PROJECT: SH0089S006
DRINKWATER SURVEILLANCE PROGRAM
ACCT: INDUSTRIAL FUND
SHARPE ARMY DEPOT
STOCKTON                         CA

CA-213820832 PROJECT: SH0089S007
FFCA OVERSITE FEES TO STATE (CA)
ACCT: DERA - DMA (OPERATIONS AND MA
SHARPE ARMY DEPOT
STOCKTON                         CA

CA-213820832 PROJECT: SH0089S004
AIR EMISSIONS RISK ANALYSIS NB TREATMENT SY
ACCT: INDUSTRIAL FUND
SHARPE ARMY DEPOT
STOCKTON                         CA

CA-213820832 PROJECT: SH-SF-2
GROUNDWATER MONITORING
ACCT: DERA - DMA (OPERATIONS AND MA
SHARPE ARMY DEPOT
STOCKTON                         CA

CA-213820832 PROJECT: SH-SF-27
GROUNDWATER TREATMENT REMEDIAL ACT-VOC REMV
ACCT: DERA - DMA (OPERATIONS AND MA
SHARPE ARMY DEPOT
STOCKTON                         CA
      150.0  ESDP
       25.0  ESDF
       85.0  CMPA
       20.0  CMPA
      291.0  CMPA
    2,000.0   CMPA
                           90/12   HIGH    DRINKING  ADEQUATE  ADEQUATE   ADEQUATE
                                          WATER     DESIGN    TIMING    ESTIMATE
                           90/09 MEDIUM   DRINKING  ADEQUATE  ADEQUATE   ADEQUATE
                                         WATER     DESIGN    TIMING    ESTIMATE
90/09  HIGH    CERCLA   ADEQUATE  ADEQUATE    ADEQUATE
                         DESIGN    TIMING    ESTIMATE
90/09  HIGH    CERCLA   ADEQUATE  ADEQUATE    ADEQUATE
                         DESIGN    TIMING    ESTIMATE
90/09  HIGH    CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
                         DESIGN    TIMING    ESTIMATE
90/09  HIGH    CERCLA   ADEQUATE   ADEQUATE   ADEQUATE
                         DESIGN    TIMING    ESTIMATE

-------
                                  FEDERAL ASENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                          DEPARTMENT OF ARMY                      ARMY MATERIAL COMMAND
                 PROJECT IDENTIFICATION
                     REQ     EST    PROJECT
  BUDGET     COMPL   COMPL   COMPL  ASSESS- MEDIA
(THOUSANDS)   STATUS   DATE    DATE   MENT    TYPE
                                                                                                                     ARMY-86
                            ADEQUACY  OF  PROJECT
                          ENGIN-
                          EERING   TIME      COST
 CA-213820832 PROJECT:  SH-SF-29
 WATER USE STUDY
 ACCT: DERA - OMA (OPERATIONS AND MA
 SHARPE ARMY DEPOT
 STOCKTON                        CA

 CA-213820832 PROJECT:  SH-SF-3
 OPERATION-TCE-MONITORING GW TREATMENT SS
 ACCT:  DERA - OMA (OPERATIONS AND MA
 SHARPE ARMY DEPOT
 STOCKTON                        CA

 CA-213820832 PROJECT:  SH-SF-30
 SOIL  REMEDIATION AFTER RI/FS COMPLETION
 ACCT:  DERA - OMA (OPERATIONS AND MA
 SHARPE  ARMY DEPOT
 STOCKTON                        CA

 CA-213820832  PROJECT: SH-SF-12
 AUTOMATION OF MONITOR WELL NETWORK
 ACCT: DERA  - OMA  (OPERATIONS AND MA
 SHARPE ARMY  DEPOT
 STOCKTON                         CA

 CA-213820832 PROJECT: SH-SF-15
ARSENIC CONTAMINATED SOIL REMEDIATION
ACCT: DERA  - OMA  (OPERATIONS AND MA
SHARPE ARMY DEPOT
STOCKTON                         CA

CA-213820832 PROJECT: A-SF-008A
INSTALLATION RESTORATION RI/FS S, RA
ACCT: DERA  - OMA  (OPERATIONS AND MA
SHARPE ARMY DEPOT
STOCKTON                         CA
                                                       50.0  CMPA
        1.0   CMPA
    6,000.0   CMPA
       20.0   CMPA
    2,000.0   CMPA
    6,000.0   ESDF
                                                                           90/09  HIGH    CERCLA
                           90/09  HIGH    CERCLA
                           91/01  HIGH    CERCLA
                           90/09  HIGH    CERCLA
90/09  HIGH    CERCLA
90/09  HIGH    CERCLA
                                                  ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
                                                  ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
                                                  ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
                                                  ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
ADEQUATE  ADEQUATE   ADEQUATE
 DESIGN    TIMING    ESTIMATE
                                                  ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE

-------
                                 FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                         DEPARTMENT OF ARMY                      ARMY MATERIAL COMMAND
                PROJECT IDENTIFICATION
                     REQ    EST    PROJECT
  BUDGET     COMPL   COMPL  COMPL  ASSESS- MEDIA
(THOUSANDS)   STATUS  DATE    DATE   MENT    TYPE
                                                                                                                      ARMY-87
                            ADEQUACY OF PROJECT
                          ENGIN-
                          EERING    TIME      COST
CA-213820832 PROJECT: SH-SW-19
HAZARDOUS WASTE DISPOSAL
ACCT: INDUSTRIAL FUND
SHARPE ARMY DEPOT
STOCKTON                         CA

CA-213820832 PROJECT: SH-W-1A
TEST SURVEY ft MONITOR UDGRD TANKS
ACCT: INDUSTRIAL FUND
SHARPE ARMY DEPOT
STOCKTON                         CA

CA-213820S32 PROJECT: SH0089S015
HAZARDOUS WASTE OPERATIONS
ACCT: INDUSTRIAL FUND
SHARPE ARMY DEPOT
STOCKTON                         CA

CA-213820832 PROJECT: SH0089S014
CASH FACILITY WITH OIL-WATER SEPARATOR B75
ACCT: INDUSTRIAL FUND
SHARPE ARMY DEPOT
STOCKTON                         CA

CA-213820832 PROJECT: SH-A-8
ASBESTOS REMOVAL
ACCT: INDUSTRIAL FUND
SHARPE ARMY DEPOT
STOCKTON                         CA

CA-213820832 PROJECT: SH0089S016
SPCC AND ISC PLANS
ACCT: INDUSTRIAL FUND
SHARPE ARMY DEPOT
STOCKTON                         CA
      210.0  CMPA
       10.0   CMPA
       50.0   CMPA
      150.0   ESDP
      600.0   ESDP
       10.0   ESRO
                           90/09  HIGH    SOLID    ADEQUATE  ADEQUATE   ADEQUATE
                                         WASTE     DESIGN    TIMING    ESTIMATE
                           90/09  HIGH    SOLID    ADEQUATE  ADEQUATE   ADEQUATE
                                         WASTE     DESIGN    TIMING    ESTIMATE
90/09  HIGH    SOLID    ADEQUATE  ADEQUATE    ADEQUATE
               WASTE     DESIGN    TIMING    ESTIMATE
90/09  HIGH    SOLID    ADEQUATE   ADEQUATE   ADEQUATE
               WASTE     DESIGN    TIMING    ESTIMATE
                           90/09  HIGH    TOXIC    ADEQUATE  ADEQUATE   ADEQUATE
                                       SUBSTANCE   DESIGN    TIMING    ESTIMATE
                           90/09   LOW     WATER    ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE

-------
                                  FEDERAL AGENCY  POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                          DEPARTMENT OF ARMY                      ARMY MATERIAL COMMAND
                 PROJECT IDENTIFICATION
                     REQ     EST    PROJECT
  BUDGET     COMPL   COMPL   COMPL  ASSESS- MEDIA
(THOUSANDS)   STATUS  DATE    DATE   MENT    TYPE
                                                                     ARMY-88
                            ADEQUACY OF PROJECT
                          ENGIN-
                          EERING    TIME      COST
 CA-213820332 PROJECT:  SH-W-25
 SPILL PREVENTION CONTROL COUNTERMEASURES
 ACCT: INDUSTRIAL FUND
 SHARPE ARMY DEPOT
 STOCKTON                         CA
 CA-213S20843 PROJECT:  SA-A-17
 RADON SURVEYS
 ACCT: INDUSTRIAL  FUND
 SIERRA ARMY DEPOT
 HERLONG
 CA-213820843  PROJECT:  SA-A-18
 RADON ABATEMENT  PROJECTS
 ACCT:  INDUSTRIAL FUND
 SIERRA ARMY DEPOT
 HERLONG
                                 CA
                                 CA
CA-213820843 PROJECT: SA0089S004
RADON SURVEYS
ACCT: INDUSTRIAL FUND
SIERRA ARMY DEPOT
HERLONG                          CA

CA-213820843 PROJECT: SA-SF-5
INSTALL MONITORING WELLS (GROUNDWATER)
ACCT: DERA - OMA (OPERATIONS AND MA
SIERRA ARMY DEPOT
HERLONG                          CA

CA-213820843 PROJECT: SA-SF-6
ABANDONNED DEMO/GRNDS IN HONEY LAKE
ACCT: DERA - OMA (OPERATIONS AND MA
SIERRA ARMY DEPOT
HERLONG                          CA
       25.0   OTHR
       68.0   ESDP
      162.0   ESDP
      66.0   ESDP
   12,000.0  CMPA
   1,000.0  OTHR
                           90/09   LOW     WATER    ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
                           90/09  HIGH     AIR     ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
                          90/09  HIGH     AIR     ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
                          90/09  HIGH     AIR     ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
90/09  HIGH    CIRCLA   ADEQUATE  ADEQUATE    ADEQUATE
                         DESIGN    TIMING    ESTIMATE
90/09 MEDIUM   CERCLA   ADEQUATE  ADEQUATE    ADEQUATE
                         DESIGN    TIMING    ESTIMATE

-------
                                 FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                         DEPARTMENT OF ARMY                      ARMY MATERIAL COMMAND
                PROJECT IDENTIFICATION
                     REQ    EST   PROJECT
  BUDGET     COMPL   COMPL  COMPL ASSESS- MEDIA
(THOUSANDS)  STATUS  DATE   DATE   MENT    TYPE
                                                                                                                     ARMY-89
                            ADEQUACY  OF  PROJECT
                          ENGIN-
                          EERING   TIME      COST
CA-213820843 PROJECT: SA-SW-26
HAZARDOUS WASTE DISPOSAL
ACCT: INDUSTRIAL FUND
SIERRA ARMY DEPOT
HERLONG                          CA

CA-213820843 PROJECT: SA-W-11
TEST/CERTIFY/REMOVE/CLEANUP UST
ACCT: INDUSTRIAL FUND
SIERRA ARMY DEPOT
HERLONG                          CA

CA-213820843 PROJECT: SA-A-16
ASBESTOS ABATEMENT PROJECT
ACCT: INDUSTRIAL FUND
SIERRA ARMY DEPOT
HERLONG                          CA

CO-213820725 PROJECT: PU-A-14
ASBESTOS ABATEMENT PROGRAM
ACCT: DMA OPERATIONS & MAINT.ARMY
PUEBLO ARMY DEPOT ACTIVITY
PUEBLO                           CO

CO-213820725 PROJECT: PU-A-24
RADON ABATEMENT PROJECTS
ACCT: INDUSTRIAL FUND
PUEBLO ARMY DEPOT ACTIVITY
PUEBLO                           CO

CO-213820725 PROJECT: A072A
RCRA PART B PERMIT APPLICATION
ACCT: OMA OPERATIONS & MAINT.ARMY
PUEBLO ARMY DEPOT ACTIVITY
PUEBLO                           CO
      120.0  CMPA
      350.0  ESDP
      500.0  ESDP
      219.0  ESDF
      149.0  ESDF
       20.0  CMPA
                           90/09  HIGH     SOLID    ADEQUATE  ADEQUATE   ADEQUATE
                                          WASTE     DESIGN    TIMING    ESTIMATE
                           90/09   HIGH    SOLID    ADEQUATE  ADEQUATE   ADEQUATE
                                         WASTE     DESIGN    TIMING    ESTIMATE
90/09  HIGH    TOXIC    ADEQUATE   ADEQUATE    ADEQUATE
             SUBSTANCE   DESIGN    TIMING     ESTIMATE
90/09 MEDIUM    AIR     ADEQUATE   ADEQUATE   ADEQUATE
                         DESIGN     TIMING    ESTIMATE
                           90/09  MEDIUM    AIR
90/09  HIGH    SOLID
               WASTE
                        ADEQUATE   ADEQUATE   ADEQUATE
                         DESIGN     TIMING    ESTIMATE
ADEQUATE  ADEQUATE   ADEQUATE
 DESIGN    TIMING    ESTIMATE

-------
                                  FEDERAL  AGENCY  POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                          DEPARTMENT  OF  ARMY                      ARMY MATERIAL COMMAND
                 PROJECT IDENTIFICATION
                                    REQ    EST   PROJECT
                 BUDGET     COMPL   COMPL  COMPL ASSESS- MEDIA
                (THOUSANDS)  STATUS  DATE   DATE  MENT    TYPE
                                                                                     ARMY-90
    ADEQUACY OF PROJECT
  ENGIN-
  EERING    TIME      COST
 CO-213S20725 PROJECT:  PU-SW-5
 HAZARDOUS WASTE DISPOSAL
 ACCT:  INDUSTRIAL FUND
 PUEBLO ARMY DEPOT ACTIVITY
 PUEBLO                          CO

 CO-213820725 PROJECT:  PU-SW-3
 CONSTRUCT OB TROUGH  OBOD
 ACCT:  INDUSTRIAL FUND
 PUEBLO ARMY DEPOT ACTIVITY
 PUEBLO                          CO

 CO-213820725 PROJECT:  PU-SW-7
 STUDY-EVALUATING OD  RESIDUES OBOD
 ACCT:  INDUSTRIAL FUND
 PUEBLO ARMY DEPOT ACTIVITY
 PUEBLO                          CO
CO-213820725 PROJECT: PU-W-10
UNDERGROUND STORAGE TANKS
ACCT: INDUSTRIAL FUND
PUEBLO ARMY DEPOT ACTIVITY
PUEBLO
CO-213820725 PROJECT: PU-W-15
CONCRETE CONTAINMENT PADS
ACCT: INDUSTRIAL FUND
PUEBLO ARMY DEPOT ACTIVITY
PUEBLO
                                 CO
CO
CO-213820725 PROJECT: PU-SW-20
PREPARE/IMPLEMENT OBOD CLOSURE&POST CLOSURE
ACCT: INDUSTRIAL FUND
PUEBLO ARMY DEPOT ACTIVITY
PUEBLO                           CO
                                                      264.0  CMPA
                      50.0  ESDP
                      50.0  ESDP
                                          90/09  HIGH    SOLID
                                                         WASTE
                                          90/09  HIGH    SOLID
                                                         WASTE
ADEQUATE  ADEQUATE   ADEQUATE
 DESIGN    TIMING    ESTIMATE
                                          90/09  HIGH
                     132.0  ESDP   92/01  90/09  HIGH
                      20.0  ESDP
                   1,750.0  ESDP
                                          90/09  HIGH
                                          90/09  HIGH
                                                         SOLID
                                                         WASTE
                                                         SOLID
                                                         WASTE
                                                         SOLID
                                                         WASTE
                                                         SOLID
                                                         WASTE
  NOT
 AVAIL
  NOT
 AVAIL
  NOT
 AVAIL
  NOT
 AVAIL
  NOT
 AVAIL
 NOT
AVAIL
 NOT
AVAIL
 NOT
AVAIL
 NOT
AVAIL
 NOT
AVAIL
 NOT
AVAIL
 NOT
AVAIL
 NOT
AVAIL
 NOT
AVAIL
 NOT
AVAIL

-------
                                 FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR  1991

                         DEPARTMENT OF ARMY                      ARMY MATERIAL COMMAND
                PROJECT IDENTIFICATION
                     RES    EST   PROJECT
  BUDGET     COMPL   COMPL  COMPL  ASSESS- MEDIA
(THOUSANDS)   STATUS  DATE   DATE   MENT    TYPE
                                                                                                                     ARMY-91
                            ADEQUACY OF  PROJECT
                          ENGIN-
                          EERING    TIME      COST
CO-213820725 PROJECT: PU-SW-21
SOLID WASTE MANAGEMENT UNITS
ACCT: DERA - DMA (OPERATIONS AND MA
PUEBLO ARMY DEPOT ACTIVITY
PUE3LO                           CO

CO-213820725 PROJECT: PU-SW-2
CLOSURE OF OB PIT OBOD
ACCT: DERA - OMA (OPERATIONS AND MA
PUEBLO ARMY DEPOT ACTIVITY
PUEBLO                           CO

CO-213820725 PROJECT: PU-SW-11
NON-HAZARDOUS LANDFILL STUDY
ACCT: INDUSTRIAL FUND
PUEBLO ARMY DEPOT ACTIVITY
PUEBLO                           CO

CO-213820725 PROJECT: PU-TS-23
TRANSFORMER ABATEMENT PROGRAM
ACCT: INDUSTRIAL FUND
PUEBLO ARMY DEPOT ACTIVITY
PUEBLO                           CO

CO-213820769 PROJECT: RM-SF-17
ENDANGERMENT ASSESSMENT
ACCT: DERA - OMA (OPERATIONS AND MA
ROCKY MT.  ARS_(PMRMA)
COMMERCE CITY                    CO

CO-213820769 PROJECT: RM-SF-18
FEASIBILITY STUDIES/DEVELOP ALTERNATIVE
ACCT: DERA - OMA (OPERATIONS AND MA
ROCKY MT.  ARS_(PMRMA)
COMMERCE CITY                    CO
      100.0  ESDF
       50.0  ESDF
       75.0  ESRE
       50.0  ESDP
      550.0  CMPA
    6,050.0   CMPA
90/09 MEDIUM   SOLID      NOT       NOT        NOT
               WASTE     AVAIL     AVAIL      AVAIL
90/09 MEDIUM   SOLID      NOT       NOT        NOT
               WASTE     AVAIL     AVAIL      AVAIL
90/09 MEDIUM   SOLID      NOT       NOT         NOT
               WASTE     AVAIL     AVAIL      AVAIL
90/09  HIGH    TOXIC    ADEQUATE   ADEQUATE   ADEQUATE
             SUBSTANCE   DESIGN    TIMING    ESTIMATE
90/09  HIGH    CERCLA   ADEQUATE   ADEQUATE   ADEQUATE
                         DESIGN    TIMING    ESTIMATE
90/09  HIGH    CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
                         DESIGN    TIMING    ESTIMATE

-------
                                  FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                          DEPARTMENT  OF ARMY                      ARMY MATERIAL COMMAND
                 PROJECT IDENTIFICATION
                     REQ    EST    PROJECT
  BUDGET     COMPL   COMPL   COMPL  ASSESS- MEDIA
(THOUSANDS)   STATUS   DATE    DATE   MENT    TYPE
                                                                     ARMY-92
                            ADEQUACY OF  PROJECT
                          ENGIN-
                          EERING    TIME      COST
 CO-213820769 PROJECT:  RM-SF-19
 FEASIBILITY STUDIES/PILOT  DEMOS
 ACCT:  DERA - RDTE(RESEARCH,DEV,TRAI
 ROCKY  MT.  ARS_(PMRMA)
 COMMERCE CITY                   CO

 CO-213820769 PROJECT:  RM-SF-20
 DESIGN & EXECUTION
 ACCT:  DERA - DMA  (OPERATIONS AND MA
 ROCKY  MT.  ARS_(PMRMA)
 COMMERCE CITY                   CO

 CO-213820769 PROJECT:  RM-SF-21
 OPERATION  & MAINTENANCE
 ACCT:  DERA -  DMA  (OPERATIONS AND MA
 ROCKY  MT.  ARS_(PMRMA)
 COMMERCE CITY                    CO

 CO-213820769  PROJECT:  RM-SF-22
 PROGRAM MANGEMENT/STAFF SUPPORT
 ACCT: DERA  - DMA  (OPERATIONS AND MA
 ROCKY MT   ARS_(PMRMA)
 COMMERCE CITY~                   CO

 CO-213S20769 PROJECT: RM-SF-23
 PROGRAM MANAGEMENT/COMPUTER HARDWARE
 ACCT: DERA  - OPA  (OTHER PROCUREMENT
 ROCKY MT.  ARS (PMRMA)
COMMERCE CITY~                   CO

CO-213820769 PROJECT: RM-SF-27
CONST.  GW INTERCEPT/TRMT SYS NORTH BASIN F
ACCT: DERA  - DMA  (OPERATIONS AND MA
ROCKY MT.  ARS_(PMRMA)
COMMERCE CITY                    CO
                                                      800.0  CMPA
   12,178.0   CMPA
   21,671.0   CMPA
    8,895.0   CMPA
      319.0  CMPA
       75.0  CMPA
                           90/09  HIGH
90/09  HIGH
90/09  HIGH
                          90/09  HIGH
                          90/09  HIGH
90/09  HIGH
                                         CERCLA
                                         CERCU
                                         CERCLA
               CERCLA
                                         CERCLA
                                         CERCLA
                                                  ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
                                                  ADEQUATE  ADEQUATE
                                                   DESIGN    TIMING
                                                  ADEQUATE  ADEQUATE
                                                   DESIGN    TIMING
                                                  ADEQUATE  ADEQUATE
                                                   DESIGN    TIMING
                                                  ADEQUATE  ADEQUATE
                                                   DESIGN    TIMING
                                                    NOT
                                                   AVAIL
                                    NOT
                                   AVAIL
                                             ADEQUATE
                                             ESTIMATE
                                             ADEQUATE
                                             ESTIMATE
                                             ADEQUATE
                                             ESTIMATE
                                             ADEQUATE
                                             ESTIMATE
 NOT
AVAIL

-------
                                 FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR  1991

                         DEPARTMENT OF ARMY                      ARMY MATERIAL COMMAND
                PROJECT IDENTIFICATION
                     REQ    EST    PROJECT
  BUDGET     COMPL   COMPL  COMPL  ASSESS- MEDIA
(THOUSANDS)   STATUS  DATE    DATE   MENT    TYPE
                                                                     ARMY-93
                            ADEQUACY  Of  PROJECT
                          ENGIN-
                          EERING    TIME     COST
CO-213820769 PROJECT: RM-SF-29
PRETREATMENT OF CERCLA LIQUID WASTE_(M)
ACCT: DERA - OMA (OPERATIONS AND MA
ROCKY MT. ARS_(PMRMA)
COMMERCE CITY                    CO

CO-213S20769 PROJECT: RM-SF-31
ASSESSMENT OF GW TREATMENT SYS N OF ARSENAL(A)
ACCT: DERA - OMA (OPERATIONS AND MA
ROCKY MT. ARS_(PMRMA)
COMMERCE CITY                    CO

CO-213820769 PROJECT: RM-SF-33
IMPROV OF N BOUNDARY SYS » EVAL OF ALL SYS (B)
ACCT: DERA - OMA (OPERATIONS AND MA
ROCKY MT. ARSJPMRMA)
COMMERCE CITY                    CO

CO-213820769 PROJECT: RM-SF-35
DESIGN GW TREATMENT SYS BASIN A NECK_(E)
ACCT: DERA - OMA (OPERATIONS AND MA
ROCKY MT. ARS_(PMRMA)
COMMERCE CITY                    CO

CO-213620769 PROJECT: RM-SF-37
BASIN F LIQUIDS, SLUDGES, AND SOILS REMEDIATION
ACCT: DERA - OMA (OPERATIONS AND MA
ROCKf MT. ARS_(PMRMA)
COMMERCE CITY                    CO

CO-213820769 PROJECT: RM-SF-40
CLOSURE OF HYDRAZINE FACILITY (H)
ACCT: DERA - OMA (OPERATIONS AND MA
POCKf MT. ARS_(PMRMA)
COMMERCE CITY                    CO
      439.0   CMPA
    2,150.0   CMPA
      334.0   CMPA
         .0   CMPA
   20,200.0   CMPA
      100.0   CMPA
                           90/09  HIGH
90/09  HIGH
                           90/09  HIGH
                           90/09  HIGH
                          90/09  HIGH
                          90/09  HIGH
                                         CERCLA
               CERCLA
               CERCLA
                                         CERCLA
                                         CERCLA
                                         CERCLA
                                                    NOT
                                                   AVAIL
                                                    NOT
                                                   AVAIL
                                                    NOT
                                                   AVAIL
                                                    NOT
                                                   AVAIL
                                                    NOT
                                                   AVAIL
                                                    NOT
                                                   AVAIL
                                   NOT
                                  AVAIL
                                   NOT
                                  AVAIL
                                   NOT
                                  AVAIL
                                   NOT
                                  AVAIL
                                   NOT
                                  AVAIL
                                   NOT
                                  AVAIL
 NOT
AVAIL
 NOT
AVAIL
 NOT
AVAIL
 NOT
AVAIL
 NOT
AVAIL
 NOT
AVAIL

-------
                                  FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                          DEPARTMENT  OF  ARMY                      ARMY MATERIAL COMMAND
                 PROJECT IDENTIFICATION
                     REQ    EST   PROJECT
  BUDGET     COMPL    COMPL  COMPL ASSESS- MEDIA
(THOUSANDS)   STATUS   DATE   DATE  MENT    TYPE
                                                                                                                     ARMY-94
  ADEQUACY OF PROJECT
ENGIN-
EERING    TIME      COST
 CO-213820769 PROJECT:  RM-SF-42
 REMEDIATION OF SANITARRY  SEWER  -  (3)
 ACCT:  DERA - DMA (OPERATIONS  AND  MA
 ROCKY  (IT.  ARS_(PMRMA)
 COMMERCE  CITY                    CO

 CO-213820769 PROJECT:  RM-SF-46
 REMOVAL OF OTHER CONTAMINATION  SOURCES (L)
 ACCT:  DERA - DMA (OPERATIONS  AND  MA
 ROCKY  MT.  ARS_(PMRMA)
 COMMERCE CITY                    CO

 IA-213820445 PROJECT:  A-SF-004A
 INSTALLATION RESTORATION SURVEY & CLEAN UP
 ACCT:  DERA  -  OMA  (OPERATIONS  AND MA
 IOWA ARMY  AMMO PLT
 MIDDLETOWN                        IA

 IL-213820376  PROJECT:  SS-A-9
 A/E SURVEY  POST BLDGS  FOR ASBESTOS CONTENT
 ACCT:  OMA OPERATIONS & MAINT.ARMY
 PRICE  SUPPORT CENTER
 GRANITE CITY                     IL

 IL-213820376  PROJECT:  SS-R-16
 SURVEY FOR RADON GAS
 ACCT:  OMA OPERATIONS 4 MAINT.ARMY
 PRICE  SUPPORT CENTER
GRANITE CITY                     IL

 IL-213820376  PROJECT:  SS-W-7
MONITOR GROUNDWATER FROM ABANDONED LANDFILC7PN1
ACCT: OMA OPERATIONS & MAINT.ARMY
PRICE  SUPPORT CENTER
GRANITE CITY                     IL
                                                       50.0  CMPA
    5,025.0   CMPA
                          90/09  HIGH    CERCLA     NOT       NOT        NOT
                                                   AVAIL     AVAIL      AVAIL
                          90/09  HIGH    CERCLA     NOT       NOT        NOT
                                                   AVAIL     AVAIL      AVAIL
       50.0   ESDF   90/09  90/09  HIGH    CERCLA     NOT     OVERDUE      LOW
                                                   AVAIL     TIMING    ESTIMATE
       50.0  OTHR
        7.0   ESDF
       20.0   ESDP
                          90/09 MEDIUM    AIR     ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
                          90/09 MEDIUM RADIATION  ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
                          90/09  HIGH    WATER    ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE

-------
                                 FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                         DEPARTMENT OF ARMY                      ARMY MATERIAL COMMAND
                PROJECT IDENTIFICATION
                                       REQ    EST   PROJECT
                    BUDGET     COMPL   COMPL  COMPL ASSESS- MEDIA
                  (THOUSANDS)  STATUS  DATE   DATE  MENT    TYPE
                                                                                                                     ARMY-95
                            ADEQUACY OF  PROJECT
                          ENGIN-
                          EERING    TIME      COST
IL-213820460 PROJECT: A-SF-005A
INSTALLATION RESTORATION SURVEY ft CLEANUP
ACCT: DERA - DMA (OPERATIONS AND MA
JOLIET ARMY AMMUNITION PLANT
JOLIET                           IL

IL-213820460 PROJECT: A041W
SEWER INFILTRATION STUDY
ACCT: PAA(PEMA)
JOLIET ARMY AMMUNITION PLANT
JOLIET                           IL

IL-213820803 PROJECT: SV-A-13
RADON ABATEMENT PROJECTS
ACCT: OMA OPERATIONS & MAINT.ARMY
SAVANNA DEPOT ACTIVITY
SAVANNA                          IL

IL-213820803 PROJECT: SV0089S006
RADON SURVEY
ACCT: INDUSTRIAL FUND
SAVANNA DEPOT ACTIVITY
SAVANNA                          IL
IL-213820803 PROJECT: SV-W-4
UPGRADING DETONATION GROUND ft
ACCT: MILCON,ARMY (MCA)
SAVANNA DEPOT ACTIVITY
SAVANNA
MONITORING OBOD
   IL
IL-213820803 PROJECT: SV-W-5
TESTING UST AND CORRECT DEFICIENCIES
ACCT: INDUSTRIAL FUND
SAVANNA DEPOT ACTIVITY
SAVANNA                          IL
                        300.0  ESDF
                         30.0  ESRO
                         28.0  ESDF
                         53.0  ESDF
                      2,000.0  PSDF
                                                       22.0  PSDF
                                             90/09  HIGH    CERCLA   ADEQUATE  ADEQUATE      LOW
                                                                      DESIGN    TIMING     ESTIMATE
                                             90/09 MEDIUM   WATER     ADEQUATE  ADEQUATE   ADEQUATE
                                                                      DESIGN    TIMING    ESTIMATE
                                             90/09  HIGH     AIR      ADEQUATE  ADEQUATE      LOW
                                                                     DESIGN    TIMING    ESTIMATE
                                             90/09 MEDIUM    AIR      ADEQUATE  ADEQUATE   ADEQUATE
                                                                     DESIGN    TIMING    ESTIMATE
90/09 MEDIUM   SOLID
               WASTE
                                             90/09 MEDIUM   SOLID
                                                            WASTE
ADEQUATE  ADEQUATE   ADEQUATE
 DESIGN    TIMING    ESTIMATE
                        ADEQUATE  ADEQUATE   ADEQUATE
                        DESIGN    TIMING    ESTIMATE

-------
                                  FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                          DEPARTMENT OF ARMY                     ARMY MATERIAL COMMAND
                 PROJECT IDENTIFICATION
                     REQ     EST    PROJECT
  BUDGET     COMPL   COMPL   COMPL  ASSESS- MEDIA
(THOUSANDS)   STATUS   DATE    DATE   MENT    TYPE
                                                                     ARMY-96
                            ADEQUACY OF PROJECT
                          ENGIN-
                          EERING    TIME      COST
 IL-213820803 PROJECT:  SV-SW-2
 HAZARDOUS WASTE DISPOSAL
 ACCT:  INDUSTRIAL FUND
 SAVANNA DEPOT ACTIVITY
 SAVANNA                          IL

 IL-213820803 PROJECT:  SV-A-11
 ASBESTOS ABATEMENT  PROJECT
 ACCT:  INDUSTRIAL FUND
 SAVANNA DEPOT ACTIVITY
 SAVANNA                          IL

 IL-213821833 PROJECT:  RI0089S003
 REPLACE PAINT WASTEWATER SYSTEM.  BLDG 208
 ACCT:  INDUSTRIAL FUND
 ROCK ISLAND  ARSENAL
 ROCK ISLAND                       IL

 IL-213839596  PROJECT:  AR-SF-2
 TRAVEL  IN SUPPORT OF IRP
 ACCT: DERA -  OMA  (OPERATIONS AND  MA
 HQ ARMAMNTS,  MUNTNS &  CHEM CMD
 ROCK ISLAND                       IL

 IL-213839596  PROJECT:  ARC089S001
 REMOVE/REPLACE UNDERGROUND STORAGE TANKS
 ACCT: PAA(PEMA)
 H<3 ARMAMNTS,  MUNTNS &  CHEM CMD
 ROCK ISLAND                       IL

 IN-213820454  PROJECT:  JE-5W-4
GROUND WATER  MONITORING SOLID WASTE LANDFILL
ACCT: RDT & E
JEFFERSON PROVING GROUND
MADISON                           IN
                                                       30.0  OTHR
      530.0   ESDF
      289.0   ESRO
      50.0  OTHR
   2,522.0  ESDF
         .0  ESDP
                           90/09   LOW     SOLID    ADEQUATE  ADEQUATE   ADEQUATE
                                         WASTE     DESIGN    TIMING    ESTIMATE
                           90/09 MEDIUM   TOXIC    ADEQUATE  ADEQUATE   ADEQUATE
                                       SUBSTANCE   DESIGN    TIMING    ESTIMATE
                          90/10 MEDIUM   SOLID    ADEQUATE  ADEQUATE   ADEQUATE
                                         WASTE     DESIGN    TIMING    ESTIMATE
                          90/09 MEDIUM   CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
90/09 MEDIUM   SOLID
               WASTE
                          90/09  HIGH    SOLID
                                         WASTE
                                                  ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
                        ADEQUATE  ADEQUATE    ADEQUATE
                         DESIGN    TIMING    ESTIMATE

-------
                                 FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                         DEPARTMENT OF ARMY                      ARMY MATERIAL COMMAND
                PROJECT IDENTIFICATION
                     REQ    EST   PROJECT
  BUDGET     COMPL   COMPL  COMPL ASSESS- MEDIA
(THOUSANDS)  STATUS  DATE   DATE  MENT    TYPE
                                                                                                                      ARMY-97
    ADEQUACY OF PROJECT
  ENGIN-
  EERING    TIME      COST
IN-213820454 PROJECT: JE-W-1                           15.0  ESDF
MONITORING UNDERGROUND STORAGE TANKS
ACCT: DMA OPERATIONS 4 MAINT.ARMY
JEFFERSON PROVING GROUND
MADISON                          IN

IN-213820454 PROJECT: JE-W-7                          680.0  ESRO
REPLACE UNDERGOUND FUEL STORAGE TANKS
ACCT: RDT & E
JEFFERSON PROVING GROUND
MADISON                          IN

IN-213820454 PROJECT: JE-SW-5                           4.0  ESRE
OPEN DETONATION SOIL SURFACE HEAVY METAL ANALYS
ACCT: RDT & E
JEFFERSON PROVING GROUND
MADISON                          IN

IN-213820454 PROJECT: JE-SW-3                           8.0  ESRE
ANALYSIS OF HAZARDOUS WASTE FROM OB OPERATION
ACCT: RDT & E
JEFFERSON PROVING GROUND
MADISON                          IN

IN-213820454 PROJECT: JF0089S001                      200.0  ESRO
JPG ASBESTOS REMOVAL AND TOXIC ASBESTOS DISPOSA
ACCT: OMA OPERATIONS & MAINT.ARMY
JEFFERSON PROVING GROUND
MADISON                          IN

IN-213820454 PROJECT: JE-TS-2                          17.0  ESRE
PCB & ASBESTOS ANALYSIS BY TSCA REQMTS
ACCT: RDT & E
JEFFERSON PROVING GROUND
MADISON                          IN
                           90/09 MEDIUM   SOLID     ADEQUATE  ADEQUATE   ADEQUATE
                                          WASTE      DESIGN    TIMING    ESTIMATE
                           90/09 MEDIUM   SOLID
                                          WASTE
                           90/09  LOW     SOLID
                                          WASTE
ADEQUATE  ADEQUATE   ADEQUATE
 DESIGN    TIMING    ESTIMATE
ADEQUATE  ADEQUATE   ADEQUATE
 DESIGN    TIMING    ESTIMATE
                           90/09 MEDIUM    SOLID    ADEQUATE  ADEQUATE   ADEQUATE
                                          WASTE     DESIGN    TIMING    ESTIMATE
                           91/09  MEDIUM   TOXIC    ADEQUATE  ADEQUATE   ADEQUATE
                                        SUBSTANCE   DESIGN    TIMING    ESTIMATE
                           90/09  MEDIUM   TOXIC    ADEQUATE  ADEQUATE   ADEQUATE
                                       SUBSTANCE   DESIGN    TIMING    ESTIMATE

-------
                                  FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR  1991

                          DEPARTMENT  OF  ARMY                      ARMY MATERIAL COMMAND
                 PROJECT IDENTIFICATION
                     REQ    EST   PROJECT
  BUDGET     COMPL    COMPL  COMPL ASSESS- MEDIA
(THOUSANDS)   STATUS   DATE   DATE  MENT    TYPE
                                                                                                                     ARMY-98
                            ADEQUACY OF  PROJECT
                          ENGIN-
                          EERING    TIME      COST
 IN-213822272 PROJECT:  NP0089S003
 REMOVE ASBESTOS OUTSIDE  RDX  AREA
 ACCT:  DERA - DMA (OPERATIONS AND MA
 NEWPORT ARMY AMMO PLT
 NEWPORT                         IN

 IN-213822272 PROJECT:  NP-SF-5
 INSTALLATION RESTORATION RI/FS & RA
 ACCT:  DERA - DMA (OPERATIONS AND MA
 NEWPORT ARMY AMMO PLT
 NEWPORT                         IN

 KS-213820878 PROJECT:  SF-SF-7
 INSTALLATION RESOTRATION RI/FS & RA
 ACCT:  DERA  - DMA  (OPERATIONS  AND MA
 SUNFLOWER  ARMY AMMO PLT
 DESOTO                           KS

 KS-213820878 PROJECT:  SF-TS-13
 SPILL CONTAINMENT FOR  TWO SULFURIC ACID TA
 ACCT: PAA(PEMA)
 SUNFLOWER ARMY AMMO PLT
 DESOTO                           KS

 KS-213820878  PROJECT:  SF-W-23
 SPILL CONTAINMENT FOR  THREE FUEL OIL TANKS
 ACCT: PAA(PEMA)
 SUNFLOWER ARMY AMMO PLT
DESOTO                           KS

KS-213820878  PROJECT:  SF-W-34
SPILL CONTAINMENT FOR  2 FUEL OIL TANKS
ACCT: PAA(PEMA)
SUNFLOWER ARMY AMMO PLT
DESOTO                           KS
                                                      525.0  ESDF
    2,560.0   OTHR
      500.0   PSDF
                          90/09 MEDIUM    AIR     ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
90/09  HIGH    CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
                         DESIGN    TIMING    ESTIMATE
                          90/09  HIGH
      108.0   ESDP   90/01  90/09  HIGH
      21.0  ESDF
                                         CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
                                         WATER      NOT
                                                   AVAIL
      105.0  ESDP   91/07  90/09  HIGH    WATER
                          90/09 MEDIUM   WATER
                                                    NOT
                                                   AVAIL
                                                    NOT
                                                   AVAIL
                                   NOT
                                  AVAIL
                                   NOT
                                  AVAIL
                                   NOT
                                  AVAIL
 NOT
AVAIL
 NOT
AVAIL
 NOT
AVAIL

-------
                                  FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                         DEPARTMENT OF ARMY                      ARMY MATERIAL COMMAND
                PROJECT IDENTIFICATION
                     REQ    EST   PROJECT
  BUDGET     COMPL   COMPL  COMPL ASSESS- MEDIA
(THOUSANDS)   STATUS  DATE   DATE  MENT    TYPE
                                                                                                                      ARMY-101
                            ADEQUACY OF PROJECT
                          ENGIN-
                          EERING    TIME      COST
KY-213820509 PROJECT: LXOOS9S001
MANAGE DATS BRINE AS HW
ACCT: DMA OPERATIONS t MAINT.ARMY
LEXINGTON ACTIVITY-LBAD
LEXINGTON                        KY

KY-213820509 PROJECT: LXOOS9S006
ASBESTOS ABATEMENT PROJECT
ACCT: INDUSTRIAL FUND
LEXINGTON ACTIVITY-LBAD
LEXINGTON                        KY

KY-213820509 PROJECT: LX0089S005
REVISE SPCC & ISC PLANS
ACCT: DMA OPERATIONS & MAINT.ARMY
LEXINGTON ACTIVITY-LBAD
LEXINGTON                        KY

LA-213820533 PROJECT: A-SF-006A
INSTALLATION RESTORATION RI/FS + RA
ACCT: DERA - DMA (OPERATIONS AND MA
LOUISIANA ARMY AMMO PLT
SHREVEPORT                       LA

LA-213820533 PROJECT: LO-SW-31
CENTRAL DRUM STORAGE FACILITY FOR AREA N
ACCT: PAA(PEMA)
LOUISIANA ARMY AMMO PLT
SHREVEPORT                       LA

LA-213820533 PROJECT: LO-SW-69
TEMPORARY STORAGE FACILITY FOR REACTIVE HA
ACCT: PAA(PEMA)
LOUISIANA ARMY AMMO PLT
SHREVEPORT                       LA
       75.0  CMPA
    1,701.0  ESDF
      100.0  ESRE
      200.0  ESDF
      100.0  ESDP
      165.0   ESDP
                           90/09  HIGH     SOLID     ADEQUATE  ADEQUATE   ADEQUATE
                                          WASTE     DESIGN    TIMING    ESTIMATE
90/09  LOW     TOXIC    ADEQUATE  ADEQUATE    ADEQUATE
             SUBSTANCE   DESIGN    TIMING     ESTIMATE
90/09  LOW     WATER    ADEQUATE   ADEQUATE   ADEQUATE
                         DESIGN    TIMING    ESTIMATE
                           90/09  HIGH    CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
                           90/09  HIGH    SOLID    ADEQUATE  ADEQUATE   ADEQUATE
                                         WASTE     DESIGN    TIMING    ESTIMATE
                           90/09  HIGH    SOLID    ADEQUATE  ADEQUATE   ADEQUATE
                                         WASTE     DESIGN    TIMING    ESTIMATE

-------
                                  FEDERAL  AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                          DEPARTMENT OF  ARMY                      ARMY MATERIAL COMMAND
                 PROJECT IDENTIFICATION
                     REQ     EST    PROJECT
  BUDGET     COMPL    COMPL   COMPL  ASSESS- MEDIA
(THOUSANDS)   STATUS   DATE    DATE   MENT    TYPE
                                                                     ARMY-102
  ADEQUACY OF PROJECT
ENGIN-
EERING    TIME      COST
 LA-213820533 PROJECT:  LO-SW-9
 MINIMIZATION DRUM WASHING  FACILITY
 ACCT:  PAA(PEMA)
 LOUISIANA ARMY AMMO PLT
 SHREVEPORT                       LA

 LA-213820533 PROJECT:  LO-W-89
 ENHANCED  SILVER RECOVERY
 ACCT:  PAA(PEMA)
 LOUISIANA ARMY AMMO PLT
 SHREVEPORT                       LA

 MA-213S20631  PROJECT: NK0089S015
 RADON  ABATEMENT PROGRAM
 ACCT:  RDT X  E
 NATICK RES DEV &  ENG CENTER
 NATICK                          MA

 MA-213820631  PROJECT: NK0089S017
 ENCLSN6 OF EMERG BAT STA BLD62 ASBEST ABATE &RE
 ACCT:  RDT  &  E
 NATICK RES DEV 4 ENG CENTER
 NATICK                           MA

 MA-213820631 PROJECT: NK0089S005
 REPLACEMENT OF DRINKING WATER SYSTEM HUDSON
 ACCT: AFHU920) SERIES (MAINT, REPA
NATICK RES DEV & ENG CENTER
NATICK                           MA

MA-213820631 PROJECT: NK0089S002
QUARTERLY GROUNDWATER WELL ANALYSIS
ACCT: RDT  4 E
NATICK RES DEV & ENG CENTER
NATICK                           MA
                                                      124.0  ESDP
                           90/09  HIGH    SOLID    ADEQUATE  ADEQUATE   ADEQUATE
                                         WASTE     DESIGN    TIMING    ESTIMATE
       45.0   OTHR    77/03  90/09   LOW     WATER
       10.0   ESDF
      100.0   PSDF
      550.0   ESRO
                          91/06 MEDIUM    AIR
                          94/01 MEDIUM    AIR
                                                  ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
                                                    NOT       NOT
                                                   AVAIL     AVAIL
                          90/09 MEDIUM  DRINKING    NOT
                                         WATER     AVAIL
        2.0   ESDF   93/12  90/09 MEDIUM   CERCLA     NOT
                                                   AVAIL
          NOT
         AVAIL
          NOT
         AVAIL
                     NOT
                    AVAIL
                                                   UNDER    ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
 NOT
AVAIL
 NOT
AVAIL

-------
                                 FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                         DEPARTMENT OF ARMY                      ARMY MATERIAL COMMAND
                PROJECT IDENTIFICATION
                     REQ    EST    PROJECT
  BUDGET     COMPL   COMPL  COMPL ASSESS- MEDIA
(THOUSANDS)   STATUS  DATE    DATE   MENT    TYPE
                                                                                                                     ARMY-103
                            ADEQUACY  OF  PROJECT
                          ENGIN-
                          EERING   TIME      COST
MA-213820631 PROJECT: NK-SW-7
RETROFIT AND RETROFILL OF PCB TRANSFORMERS
ACCT: DERA - OMA (OPERATIONS AND MA
NATICK RES DEV t ENS CENTER
NATICK                           MA

MA-213820631 PROJECT: NK-A-15
ASBESTOS ABATEMENT AND REMOVAL
ACCT: RDT & E
NATICK RES DEV t ENG CENTER
NATICK                           MA

MA-213820631 PROJECT: NK0089S010
CONSTRUCTION OF NEW VEHICLE WASH RACK
ACCT: RDT & E
NATICK RES DEV « ENG CENTER
NATICK                           MA

MA-213820631 PROJECT: NKOOS9S012
REPLACEMENT OF HOUSING SEPTIC TANKS
ACCT: AFHU920) SERIES (MAINT, REPA
NATICK RES DEV & ENG CENTER
NATICK                           MA

MA-213820939 PROJECT: AM-SF-2
INSTALLATION RESTORATION RI/FS & RA
ACCT: DERA - OMA (OPERATIONS AND MA
USA MAT 4 TECHNOLOGY LAB
WATERTOWN                        MA

MD-2138CSTA1 PROJECT: CSTA89S007
USACSTA ENVIRONMENTAL ASSESSMENT
ACCT: RDT 4 E
USA COMBAT SYSTEMS TEST ACT
ABERDEEN PRVG GROUND             MD
      420.0  ESRO
      500.0   PSDF
       15.0   ESRO
      200.0   ESRO
       50.0   ESDF
      100.0   ESDP
90/09 MEDIUM   SOLID    ADEQUATE   ADEQUATE    ADEQUATE
               WASTE     DESIGN    TIMING    ESTIMATE
90/09 MEDIUM   TOXIC      NOT       NOT
             SUBSTANCE   AVAIL     AVAIL
                           90/12 MEDIUM   WATER
                           90/09 MEDIUM   WATER
                                                    NOT       NOT
                                                   AVAIL     AVAIL
                                                    NOT       NOT
                                                   AVAIL     AVAIL
                                                                         NOT
                                                                        AVAIL
                                              NOT
                                             AVAIL
                                              NOT
                                             AVAIL
                           90/09  HIGH    CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
                           90/09  HIGH   MULTI     ADEQUATE  ADEQUATE   ADEQUATE
                                        MEDIA      DESIGN    TIMING    ESTIMATE

-------
                                  FEDERAL  AGENCY  POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                          DEPARTMENT OF  ARMY                      ARMY MATERIAL COMMAND
                 PROJECT IDENTIFICATION
                     REQ    EST   PROJECT
  BUDGET     COMPL   COMPL   COMPL  ASSESS- MEDIA
(THOUSANDS)   STATUS  DATE    DATE   MENT    TYPE
                                                                     ARMY-104
                            ADEQUACY OF PROJECT
                          ENGIN-
                          EERING    TIME      COST
 MD-2138CSTA1  PROJECT:  CSTA-N-02
 NOISE MONITORING
 ACCT: RDT & E
 USA COMBAT SYSTEMS  TEST  ACT
 ABERDEEN PRVG GROUND             MD
                                                      200.0  ESDP
                           90/09   HIGH    NOISE
                                                  ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
 MD-2138CSTA1  PROJECT: CSTA89S002
 WEAPON  TESTING  NOISE MITIGATION ENCLOSURE
 ACCT: RDT  &  E
 USA  COMBAT SYSTEMS TEST ACT
 ABERDEEN PRVG GROUND             MD

 MD-2138CSTA1 PROJECT: CSTA89S012
 NOISE ABATEMENT TRAINING
 ACCT: RDT  4 E
 USA  COMBAT SYSTEMS TEST ACT
 ABERDEEN PRVG GROUND             MD

 MD-2138CSTA1 PROJECT: CSTA89S011
 HAZARDOUS WASTE COLLECTION
 ACCT: RDT  & E
 USA  COMBAT SYSTEMS TEST ACT
 ABERDEEN PRVS GROUND             MD

 MD-213SCSTA1 PROJECT: CSTA89S008
 HAZARDOUS WASTE TRAINING
 ACCT: RDT & E
USA COKBAT SYSTEMS TEST ACT
ABERDEEN PRVG GROUND             MD

MD-2138CSTA1 PROJECT: CSTA89S003
ENVIRONMENTAL FIRING POSITION PADS
ACCT: RDT & E
USA COMBAT SYSTEMS TEST ACT
ABERDEEN PRVG GROUND             MD
    1,000.0   ESDL
        1.0   ESDL
       35.0   CMPA
         .0   CMPA
       90.0  CMPA
                           90/09  MEDIUM   NOISE
                           90/09  MEDIUM   NOISE
                           90/09  HIGH    SOLID
                                         WASTE
90/09  HIGH
90/09  HIGH
SOLID
WASTE
                                         WATER
                                                  ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
                                                  ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
                        ADEQUATE  ADEQUATE    ADEQUATE
                         DESIGN    TIMING    ESTIMATE
                                                  ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
                                                  ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE

-------
                                 FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                         DEPARTMENT OF ARMY                      ARMY MATERIAL COMMAND
                PROJECT IDENTIFICATION
                     REQ    EST   PROJECT
  BUDGET     COMPL   COMPL  COMPL ASSESS- MEDIA
(THOUSANDS)  STATUS  DATE   DATE  MENT    TYPE
                                                                     ARMY-105
    ADEQUACY OF PROJECT
  ENGIN-
  EERING    TIME      COST
MD-2138CSTA1 PROJECT: CSTA-W-05
SEDIMENT CONTROL (CSTA)
ACCT: RDT & E
USA COMBAT SYSTEMS TEST ACT
ABERDEEN PRVG GROUND             MD

MD-2138CSTA1 PROJECT: CSTA89S013
WATER POLLUTION ABATEMENT TRAINING
ACCT: RDT & E
USA COMBAT SYSTEMS TEST ACT
ABERDEEN PRVG GROUND             MD

MD-213820036 PROJECT: EA-A-13
MONITOR AIR DURING OUTDOOR OPERATIONS
ACCT: RDT & E
ABERDEEN PROVING GROUND (EA)
ABERDEEN PROVING GROUND          MD

MD-213820036 PROJECT: EA-SF-20
DECONTAMINATION AND DISPOSAL OF BLDG E5625
ACCT: DERA - DMA (OPERATIONS AND MA
ABERDEEN PROVING GROUND (EA)
ABERDEEN PROVING GROUND          MD

MD-213820036 PROJECT: EA-SF-19
USE OF BIOASSAY DATA FOR CLEANUP STRATEGIE
ACCT: DERA - OMA (OPERATIONS AND MA
ABERDEEN PROVING GROUND (EA)
ABERDEEN PROVING GROUND          MD

MD-213820036 PROJECT: EA-W-2
HAZARD MATERIAL ENVIRONMENTAL DATA SHEETS
ACCT: OMA OPERATIONS & MAINT,ARMY
ABERDEEN PROVING GROUND ( EA)
ABERDEEN PROVING GROUND          MD
       64.0  ESDP
        1.0  ESDL
      100.0  ESDP
                           90/09  HIGH     WATER
                           90/09 MEDIUM   WATER
                           90/09  HIGH      AIR
    5,585.0   ESDP   87/01   95/01   HIGH    CERCLA
      300.0   ESDF
       91.0   ESDP
                           90/09 MEDIUM   CERCLA
                           90/09  HIGH    SOLID
                                         WASTE
                                                   ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
ADEQUATE  ADEQUATE   ADEQUATE
 DESIGN    TIMING    ESTIMATE
                                                  ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
                                                  ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
                                                  ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
ADEQUATE  ADEQUATE   ADEQUATE
 DESIGN    TIMING    ESTIMATE

-------
                                  FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                          DEPARTMENT  OF  ARMY                      ARMY MATERIAL COMMAND
                 PROJECT IDENTIFICATION
                     REQ     EST    PROJECT
  BUDGET     COMPL   COMPL   COMPL  ASSESS- MEDIA
(THOUSANDS)   STATUS   DATE    DATE   MENT    TYPE
                                                                                                                      ARMY-106
                            ADEQUACY OF PROJECT
                          ENGIN-
                          EERING    TIME      COST
 MD-213820036 PROJECT:  EA-SW-34
 TREATMENT OF OB/OD  SOILS  TO  MINIMIZE HAZARD
 ACCT:  DERA - OMA (OPERATIONS AND MA
 ABERDEEN PROVING GROUND (EA)
 ABERDEEN PROVING GROUND          MD

 MD-213S20036 PROJECT:  EA-SW-5
 ENVIRON  DOCUMENTATION  OF  CONTAMINATION SOURCES
 ACCT:  OMA OPERATIONS & MAINT.ARMY
 ABERDEEN PROVING GROUND (EA)
 ABERDEEN PROVING GROUND          MD

 MD-213820036  PROJECT:  EA0089S027
 DISPOSAL OF  TON  CONTAINERS AND LIQUID
 ACCT:  DERA -  OMA (OPERATIONS  AND MA
 ABERDEEN PROVING GROUND (EA)
 ABERDEEN PROVING GROUND          MD

 MD-213820036  PROJECT:  EA0089S022
 UPGRADE  WASTE HANDLING SYSTEM E5100
 ACCT:  RDT & E
 ABERDEEN PROVING  GROUND (EA)
 ABERDEEN PROVING  GROUND          MD

 MD-213820036  PROJECT: EA0089S023
 UPGRADE WASTE HANDLING SYSTEMS
 ACCT: RDT & E
 ABERDEEN PROVING GROUND (EA)
ABERDEEN PROVING GROUND          MD

MD-213820036 PROJECT: EA0089S028
DEMIL OF FILTERS/DISPOSAL OF ASC CHARCOAL
ACCT: DERA - OMA  (OPERATIONS AND MA
ABERDEEN PROVING GROUND (EA)
ABERDEEN PROVING GROUND          MD
                                                      300.0  ESDP
      255.0   ESDP
      700.0   ESDP
                           90/09  HIGH    SOLID
                                         WASTE
                          90/09  HIGH    SOLID
                                         WASTE
                          90/09  HIGH
      800.0   ESDP   88/12  90/09  HIGH
    2,000.0   ESDP   88/12  90/12  HIGH
      282.0   ESDP
93/10  HIGH
                                         SOLID
                                         WASTE
                                         SOLID
                                         WASTE
               SOLID
               WASTE
                                         SOLID
                                         WASTE
                        ADEQUATE  ADEQUATE    ADEQUATE
                         DESIGN    TIMING    ESTIMATE
                        ADEQUATE  ADEQUATE    ADEQUATE
                         DESIGN    TIMING    ESTIMATE
                        ADEQUATE  ADEQUATE    ADEQUATE
                         DESIGN    TIMING    ESTIMATE
                        ADEQUATE  ADEQUATE    ADEQUATE
                         DESIGN    TIMING    ESTIMATE
                                                  ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
                        ADEQUATE   ADEQUATE    ADEQUATE
                         DESIGN    TIMING    ESTIMATE

-------
                                 FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                         DEPARTMENT OF ARMY                      ARMY MATERIAL COMMAND
                PROJECT IDENTIFICATION
                     REQ    EST   PROJECT
  BUDGET     COMPL   COMPL  COMPL ASSESS-  MEDIA
(THOUSANDS)   STATUS  DATE   DATE   MENT     TYPE
                                                                                                                     ARMY-107
                            ADEQUACY OF PROJECT
                          ENGIN-
                          EERING    TIME      COST
MD-213820036 PROJECT: EA0089S029
FACILITIES DEMOLITION
ACCT: DERA - OMA (OPERATIONS AND MA
ABERDEEN PROVING GROUND (EA)
ABERDEEN PROVING GROUND          MD

MD-213820036 PROJECT: EA0089S032
WP BUILDING DEMOLITION
ACCT: DERA - OMA (OPERATIONS AND MA
ABERDEEN PROVING GROUND (EA)
ABERDEEN PROVING GROUND          MD

MD-213820036 PROJECT: EA-SW-27
DISPOSAL OF RANGE RECOVERED MUNITIONS
ACCT: DERA - OMA (OPERATIONS AND MA
ABERDEEN PROVING GROUND (EA)
ABERDEEN PROVING GROUND          MD

MD-213820036 PROJECT: AA-TS-14
MULTISTAGE MOBILE HAZ MTL REMOVAL SYS
ACCT: ROT & E
ABERDEEN PROVING GROUND (EA )
ABERDEEN PROVING GROUND          MD

MD-213820036 PROJECT: EA-SW-9
PREVENTIVE ENVIRONMENTAL TECHNOLOGY
ACCT: OMA OPERATIONS & MAINT.ARMY
ABERDEEN PROVING GROUND (EA)
ABERDEEN PROVING GROUND          MD

MD-213820036 PROJECT: EA0089S001
MINIMIZE HAZARDOUS WASTE
ACCT: DERA - OMA (OPERATIONS AND MA
ABERDEEN PROVING GROUND (EA)
ABERDEEN PROVING GROUND          MD
      250.0  ESDP   90/06  90/09  HIGH
      263.0  ESDP
    2,000.0  ESRO
      325.0  ESDL
      122.0  ESDL
       50.0   OTHR
                           90/09  HIGH
                                          SOLID
                                          WASTE
               SOLID
               WASTE
90/09 MEDIUM   SOLID
               WASTE
90/09 MEDIUM   SOLID
               WASTE
                           90/09  MEDIUM    SOLID
                                          WASTE
                           90/09  MEDIUM   SOLID
                                         WASTE
                        ADEQUATE  ADEQUATE   ADEQUATE
                         DESIGN    TIMING    ESTIMATE
ADEQUATE  ADEQUATE   ADEQUATE
 DESIGN    TIMING    ESTIMATE
ADEQUATE  ADEQUATE   ADEQUATE
 DESIGN    TIMING    ESTIMATE
ADEQUATE  ADEQUATE   ADEQUATE
 DESIGN    TIMING    ESTIMATE
                        ADEQUATE   ADEQUATE   ADEQUATE
                         DESIGN    TIMING    ESTIMATE
                        ADEQUATE   ADEQUATE   ADEQUATE
                         DESIGN    TIMING    ESTIMATE

-------
                                  FEDERAL AGENCY  POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                          DEPARTMENT OF  ARMY                      ARMY MATERIAL COMMAND
                 PROJECT IDENTIFICATION
                     REQ    EST    PROJECT
  BUDGET     COMPL   COMPL   COMPL  ASSESS- MEDIA
(THOUSANDS)   STATUS   DATE    DATE   MENT    TYPE
                                                                     ARMY-108
                            ADEQUACY OF  PROJECT
                          ENGIN-
                          EERING    TIME      COST
 MD-213820036 PROJECT:  EAOOS9S010
 DISPOSAL OF VX.BZ,  AND EA3834  AGENTS
 ACCT:  RDT & E
 ABERDEEN PROVING  GROUND (EA)
 ABERDEEN PROVING  GROUND         MD
    2,750.0   OTHR
90/09  HIGH    SOLID    ADEQUATE  ADEQUATE    ADEQUATE
               WASTE     DESIGN    TIMINS    ESTIMATE
 MD-213820036  PROJECT:  EA-SW-33
 BIODEGRADATION/BIOREMEDIATION OF HAZARDOUS WAST
 ACCT: DERA  -  DMA  (OPERATIONS AND MA
 ABERDEEN  PROVING  GROUND  (EA)
 ABERDEEN  PROVING  GROUND          MD

 MD-213820036  PROJECT:  EA0089S026
 BIODEGRADATION OF HAZARDOUS MILITARY WASTE
 ACCT: DERA  -  OMA  (OPERATIONS AND MA
 ABERDEEN  PROVING GROUND  (EA)
 ABERDEEN  PROVING GROUND          MD

 MD-213820036  PROJECT:  EXH 1
 MOLTEN METAL  PROCESS HAZ WASTE MINIMIZATION
 ACCT: DERA  -  OMA  (OPERATIONS AND MA
 ABERDEEN  PROVING GROUND  (EA)
 ABERDEEN  PROVING GROUND          MD

 MD-213820036  PROJECT: AA-TS-12
 MINIMIZE  TOXIC HAZD MATLS AT CRDEC
 ACCT: RDT & E
 ABERDEEN  PROVING GROUND  (EA)
ABERDEEN  PROVING GROUND          MD

MD-213820036 PROJECT: EA-SW-8
EFFECTS OF  LAB STUDY WASTE ON TREATMENT FA
ACCT: RDT & E
ABERDEEN  PROVING GROUND  (EA)
ABERDEEN  PROVING GROUND          MD
                                                      720.0  OTHR
    3,250.0   OTHR
    2,280.0  OTHR
      250.0   ESDL
                           90/09  HIGH    SOLID    ADEQUATE  ADEQUATE   ADEQUATE
                                         WASTE     DESIGN    TIMING    ESTIMATE
90/09  HIGH    SOLID    ADEQUATE  ADEQUATE    ADEQUATE
               WASTE     DESIGN    TIMING    ESTIMATE
93/07  HIGH    SOLID    ADEQUATE   ADEQUATE    ADEQUATE
               WASTE     DESIGN    TIMING    ESTIMATE
                          90/09  HIGH    TOXIC    ADEQUATE  ADEQUATE   ADEQUATE
                                       SUBSTANCE   DESIGN    TIMING    ESTIMATE
      100.0  ESDP   77/07  90/09  HIGH    WATER    ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE

-------
                                 FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                         DEPARTMENT OF ARMY                      ARMY MATERIAL COMMAND
                PROJECT IDENTIFICATION
                     REQ    EST   PROJECT
  BUDGET     COMPL   COMPL  COMPL ASSESS- MEDIA
(THOUSANDS)  STATUS  DATE   DATE  MENT    TYPE
                                                                                                                      ARMY-109
                            ADEQUACY OF PROJECT
                          ENGIN-
                          EERING    TIME      COST
MD-213821002 PROJECT: BP-SF-1
INSTALLATION RESTORATION RI/FS & RA
ACCT: DERA - DMA (OPERATIONS AND MA
HDL-BLOSSOM POINT FIELD TEST
ADELPHI                          MD

MD-213S21002 PROJECT: HD-SW-2
DESIGN & REPAIR ACCELERATED BEACH EROSION
ACCT: RDT & E
HDL-BLOSSOM POINT FIELD TEST
ADELPHI                          MD

MD-213821355 PROJECT: AA-A-45
AIR WATER EMISSIONS INVENTORY/PROJECTIONS
ACCT: RDT & E
ABERDEEN PROVING GROUND
ABERDEEN PROVING GROUND          MD

MD-213821355 PROJECT: AAOOB9S002
FISHERIES MANAGEMENT PLAN
ACCT: RDT & E
ABERDEEN PROVING GROUND
ABERDEEN PROVING GROUND          MD

MD-213821355 PROJECT: AA0089S003
ENDANGERED SPECIES PROTECTION
ACCT: RDT 4 E
ABERDEEN PROVING GROUND
ABERDEEN PROVING GROUND          MD

MD-213821355 PROJECT: AA0089S010
WILDLIFE MANAGEMENT
ACCT: RDT & E
ABERDEEN PROVING GROUND
ABERDEEN PROVING GROUND          MD
    1>010.0  ESDF
                           90/09 MEDIUM   CERCLA
    1,150.0  ESDL   87/06   90/10  MEDIUM    SOLID
                                          WASTE
      200.0  ESDP
       15.0   ESDP
      150.0   ESDP
       35.0   ESDP
90/09  HIGH     AIR
90/09  HIGH  ENDANGRD
             SPECIES
                           90/09  HIGH   ENDANGRD
                                        SPECIES
                           90/09  HIGH  ENDANGRD
                                       SPECIES
                                                  ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
                        ADEQUATE  ADEQUATE    ADEQUATE
                         DESIGN    TIMING    ESTIMATE
ADEQUATE  ADEQUATE   ADEQUATE
 DESIGN    TIMING    ESTIMATE
                                                  ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
                        ADEQUATE   ADEQUATE   ADEQUATE
                         DESIGN   TIMING    ESTIMATE
                        ADEQUATE  ADEQUATE   ADEQUATE
                         DESIGN    TIMING    ESTIMATE

-------
                                  FEDERAL  AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                          DEPARTMENT  OF  ARMY                      ARMY MATERIAL COMMAND
                 PROJECT IDENTIFICATION
                     REQ     EST   PROJECT
  BUDGET     COMPL    COMPL   COMPL ASSESS- MEDIA
(THOUSANDS)   STATUS   DATE    DATE  MENT    TYPE
                                                                                                                     ARMY-110
                            ADEQUACY  OF  PROJECT
                          ENGIN-
                          EERING    TIME      COST
 MD-213821355 PROJECT:  AA0089S004
 IMPROVE  WILDLIFE  HABITAT
 ACCT:  RDT  &  E
 ABERDEEN PROVING  GROUND
 ABERDEEN PROVING  GROUND          MD

 MD-213821355 PROJECT:  AA0089S005
 DEER AGING STUDY
 ACCT:  RDT  &  E
 ABERDEEN PROVING  GROUND
 ABERDEEN PROVING  GROUND          MD

 MD-213821355 PROJECT:  AA0089S006
 INCREASE SAV PLANTINGS
 ACCT:  RDT &  E
 ABERDEEN PROVING  GROUND
 ABERDEEN PROVING  GROUND          MD

 MD-213S21355  PROJECT: AA-W-65
 WATERFOWL MANAGEMENT PLAN IMPLEMENTATION
 ACCT:  RDT &  E
 ABERDEEN PROVING  GROUND
 ABERDEEN PROVING  GROUND          MD

 MD-213821355  PROJECT: AA-A-66
 HISTORIC PRESERVATION PLAN (HPP)
 ACCT: RDT &  E
 ABERDEEN PROVING  GROUND
ABERDEEN PROVING  GROUND          MD

MD-213821355 PROJECT: AA0089S007
 ENVIRONMENTAL MONITORING
ACCT: RDT &  E
ABERDEEN PROVING  GROUND
ABERDEEN PROVING  GROUND          MD
                                                      204.0  ESDP
        5.0   ESDP
        5.0   ESDP
                           90/09  HIGH  ENDANGRD
                                       SPECIES
                          90/09  HIGH  ENDANGRD
                                       SPECIES
                           90/09  HIGH  ENDANGRD
                                       SPECIES
      100.0   ESDL    92/12  90/09 MEDIUM ENDANGRD
                                       SPECIES
       65.0   ESDP
         . 0   ESDP
90/09  HIGH   HIST/
              ARCH
                          90/09  HIGH   MULTI
                                        MEDIA
                        ADEQUATE   ADEQUATE    ADEQUATE
                         DESIGN    TIMING     ESTIMATE
                        ADEQUATE   ADEQUATE    ADEQUATE
                         DESIGN    TIMING     ESTIMATE
                        ADEQUATE   ADEQUATE    ADEQUATE
                         DESIGN    TIMING    ESTIMATE
                        ADEQUATE   ADEQUATE    ADEQUATE
                         DESIGN    TIMING    ESTIMATE
                                                  ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
                        ADEQUATE   ADEQUATE    ADEQUATE
                         DESIGN    TIMING    ESTIMATE

-------
                                 FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                         DEPARTMENT OF ARMY                      ARMY MATERIAL COMMAND
                PROJECT IDENTIFICATION
                     REQ    EST   PROJECT
  BUDGET     COMPL   COMPL  COMPL  ASSESS-  MEDIA
(THOUSANDS)   STATUS  DATE    DATE   MENT     TYPE
                                                                                                                     ARMY-111
  ADEQUACY OF PROJECT
ENGIN-
EERING    TIME      COST
MD-213821355 PROJECT: A060R
ENVIRONMENTAL ASSESSMENT ft EIS CONTRACTS
ACCT: DMA OPERATIONS & MAINT.ARMY
ABERDEEN PROVING GROUND
ABERDEEN PROVING GROUND          MD

MD-213821355 PROJECT: AA0089S008
RADON REDUCTION PROGRAM
ACCT: RDT & E
ABERDEEN PROVING GROUND
ABERDEEN PROVING GROUND          MD

MD-213821355 PROJECT: A-SF-001
WHITE PHOSPHCROUS DISP SITE_IRP
ACCT: DERA - DMA (OPERATIONS AND MA
ABERDEEN PROVING GROUND
ABERDEEN PROVING GROUND          MD

MD-213821355 PROJECT: AA-W-5
CARROL ISLAND AND GRACES QUARTERS IRP
ACCT: DERA - OMA (OPERATIONS AND MA
ABERDEEN PROVING GROUND
ABERDEEN PROVING GROUND          MD

MD-213821355 PROJECT: AA-SF-49
EMO STUDIES/SERVICES REQUIREMENTS CONTRACT
ACCT: RDT ft E
ABERDEEN PROVING GROUND
ABERDEEN PROVING GROUND          MD

MD-213821355 PROJECT: AA-W-6
0-FIELD AREA IRP
ACCT: DERA - OMA (OPERATIONS AND MA
ABERDEEN PROVING GROUND
ABERDEEN PROVING GROUND          MD
      150.0  ESDP   88/10   90/09  HIGH    MULTI     ADEQUATE  ADEQUATE   ADEQUATE
                                         MEDIA      DESIGN    TIMING    ESTIMATE
       50.0  CMPA
                           92/09   HIGH   RADIATION  ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
       50.0   CMPA   89/12   90/09  HIGH    CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
    1,000.0  CMPA   97/12   90/09   HIGH    CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
      900.0  ESDP
                           90/09  HIGH    CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
      820.0   ESDF    97/12   90/09 MEDIUM   CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE

-------
                                  FEDERAL  AGENCY  POLLUTION ABATEMENT PLAN FOR FISCAL YEAR J991

                          DEPARTMENT  OF ARMY                      ARMY MATERIAL COMMAND
                 PROJECT IDENTIFICATION
                     REQ    EST    PROJECT
  BUDGET     COMPL   COMPL   COMPL  ASSESS- MEDIA
(THOUSANDS)   STATUS  DATE    DATE   MENT    TYPE
                                                                     ARMY-11Z
                            ADEQUACY OF  PROJECT
                          ENGIN-
                          EERING    TIME      COST
 MD-213821355 PROJECT:  AA-W-8
 CANAL CREEK IRP
 ACCT: DERA  - DMA  (OPERATIONS AND MA
 ABERDEEN PROVING  GROUND
 ABERDEEN PROVING  GROUND          MD

 MD-213821355 PROJECT:  AA-W-9
 NIKE  SITE IRP
 ACCT:  DERA  - OMA  (OPERATIONS AND MA
 ABERDEEN PROVING  GROUND
 ABERDEEN PROVING  GROUND          MD

 MD-213821355 PROJECT:  AA-W-11
 J-FIELD  IRP
 ACCT:  DERA  - OMA  (OPERATIONS AND MA
 ABERDEEN PROVING  GROUND
 ABERDEEN PROVING  GROUND          MD

 MD-213821355 PROJECT:  AA-SW-48
 OTHER  ABERDEEN AREA SWMU IRP
 ACCT:  DERA  -  OMA  (OPERATIONS AND MA
 ABERDEEN PROVING  GROUND
 ABERDEEN PROVING  GROUND          MD

 MD-213821355  PROJECT:  AA-SW -50
 MICHAELSVILLE LANDFILL IRP
 ACCT: DERA  - OMA  (OPERATIONS AND MA
 ABERDEEN PROVING GROUND
 ABERDEEN PROVING GROUND          MD

MD-213821355 PROJECT:  AA-SW-20
 PHILLIPS FLO DISPOSAL  AREA INSTALL RESTRTION PR
ACCT: DERA  - OMA  (OPERATIONS AND MA
ABERDEEN PROVING GROUND
ABERDEEN PROVING GROUND          MD
    1,015.0   CMPA   89/10   90/09  HIGH
      670.0   CMPA   95/12   90/09  HIGH
      400.0   CMPA   95/12   90/09  HIGH
      450.0   CMPA
      110.0  CMPA
      60.0  CMPA
90/09  HIGH
90/09  HIGH
                          90/09  HIGH
               SOLID    ADEQUATE  ADEQUATE    ADEQUATE
               WASTE     DESIGN    TIMING    ESTIMATE
                                         SOLID    ADEQUATE  ADEQUATE   ADEQUATE
                                         WASTE     DESIGN    TIMING    ESTIMATE
                                         SOLID    ADEQUATE  ADEQUATE   ADEQUATE
                                         WASTE     DESIGN    TIMING    ESTIMATE
                                         SOLID    ADEQUATE  ADEQUATE   ADEQUATE
                                         WASTE     DESIGN    TIMING    ESTIMATE
                                         SOLID    ADEQUATE  ADEQUATE   ADEQUATE
                                         WASTE     DESIGN    TIMING    ESTIMATE
                                         SOLID    ADEQUATE  ADEQUATE   ADEQUATE
                                         WASTE     DESIGN    TIMING    ESTIMATE

-------
                                 FEDERAL ASENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                         DEPARTMENT OF ARMY                      ARMY MATERIAL COMMAND
                PROJECT IDENTIFICATION
                     REQ    EST   PROJECT
  BUDGET     COMPL   COMPL  COMPL ASSESS- MEDIA
(THOUSANDS)  STATUS  DATE   DATE  MENT    TYPE
                                                                                                                      ARMY-113
             ADEQUACY OF PROJECT
           ENGIN-
           EERING    TIME      COST
MD-213821355 PROJECT: AA-SW-23                      1,000.0  CMPA
OTHER EDGEWOOD AREA SWMU IRP
ACCT: DERA - OMA (OPERATIONS AND MA
ABERDEEN PROVING GROUND
ABERDEEN PROVING GROUND          MD

MD-213821355 PROJECT: AA-SW-42
HAZARDOUS WASTE DISPOSAL
ACCT: RDT & E
ABERDEEN PROVING GROUND
ABERDEEN PROVING GROUND          MD

MD-213821355 PROJECT: AA-A-51
PART B PERMIT APPLICATION OB/OD (APG EMD J FIEL
ACCT: RDT & E
ABERDEEN PROVING GROUND
ABERDEEN PROVING GROUND          MD

MD-213821355 PROJECT: AA-SW-55                         10.0  ESDP
SURVEY UST/INIATE TRACKING DATABASE
ACCT: RDT & E
ABERDEEN PROVING GROUND
ABERDEEN PROVING GROUND          MD

MD-213821355 PROJECT: AA-SW-57                         50.0  ESDP
CONTAMINATION SOIL TREATMENT
ACCT: RDT i E
ABERDEEN PROVING GROUND
ABERDEEN PROVING GROUND          MD

MD-213821355 PROJECT: AA-SW-59                        110.0  ESDP
ANNUAL REPORT * WASTE TRACKING SYSTEM
ACCT: RDT & E
ABERDEEN PROVING GROUND
ABERDEEN PROVING GROUND          MD
                           90/09  HIGH
    1,500.0  ESDP   87/10  90/09  HIGH
                           90/09 HIGH
                           90/09   HIGH
                                          SOLID
                                          WASTE
SOLID
WASTE
       10.0  ESDP   88/11   90/09  HIGH     SOLID
                                          WASTE
                           90/09   HIGH     SOLID
                                          WASTE
SOLID
WASTE
SOLID
WASTE
         ADEQUATE  ADEQUATE   ADEQUATE
          DESIGN    TIMING    ESTIMATE
ADEQUATE  ADEQUATE   ADEQUATE
 DESIGN    TIMING    ESTIMATE
         ADEQUATE  ADEQUATE
          DESIGN    TIMING
           NOT
          AVAIL
            NOT
           AVAIL
                                                  ADEQUATE  ADEQUATE
                                                   DESIGN    TIMING
ADEQUATE  ADEQUATE
 DESIGN    TIMING
                     ADEQUATE
                     ESTIMATE
 NOT
AVAIL
                     ADEQUATE
                     ESTIMATE
                                                                       ADEQUATE
                                                                       ESTIMATE

-------
                                  FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                          DEPARTMENT  OF  ARMY                      ARMY MATERIAL COMMAND
                 PROJECT IDENTIFICATION
                     REQ     EST   PROJECT
  BUDGET     COMPL    COMPL   COMPL ASSESS- MEDIA
(THOUSANDS)   STATUS   DATE    DATE  MENT    TYPE
                                                                                                                      ARMY-114
             ADEQUACY OF PROJECT
           ENGIN-
           EERING    TIME      COST
 MD-213821355 PROJECT:  AA-SW-73
 WASTE  STREAM ANALYSIS
 ACCT:  RDT  & E
 ABERDEEN PROVING  GROUND
 ABERDEEN PROVING  GROUND          MD

 MD-213821355 PROJECT:  AA-W-53
 MAINTENANCE/REMOVAL  OF UST
 ACCT:  RDT  & E
 ABERDEEN PROVING  GROUND
 ABERDEEN PROVING  GROUND          MD

 MD-213821355  PROJECT:  AA0089S009
 UPGRADE HAZARD HASTE STORAGE FACILITIES
 ACCT:  RDT  4 E
 ABERDEEN PROVING  GROUND
 ABERDEEN PROVING  GROUND          MD

 MD-213821355  PROJECT:  CSTA-SW-05
 UPGRADE OF  OPEN BURNING FACILITIES
 ACCT:  RDT  t E
 ABERDEEN PROVING  GROUND
 ABERDEEN PROVING  GROUND          MD

 MD-213821355  PROJECT:  EA-SW-28
 MOLTEN IRON PROCESS HAZ WASTE MINIMIZATION
 ACCT: DERA  - DMA  (OPERATIONS AND MA
ABERDEEN PROVING GROUND
ABERDEEN PROVING GROUND          MD

MD-213821355 PROJECT:  AA0089S001
MAXWELL POINT CLEANUP
ACCT: RDT  & E
ABERDEEN PROVING GROUND
ABERDEEN PROVING GROUND          MD
                                                      100.0  ESDP
    1,500.0   ESDP
      200.0   ESDP
                                                                           90/09  HIGH
                           90/09  HIGH
                           90/09  HIGH
      150.0   ESDP
      200.0   ESDF
                                         SOLID
                                         WASTE
SOLID
WASTE
SOLID
WASTE
       35.0   ESDP   8-+/09   90/09  HIGH    SOLID
                                         WASTE
                           90/09  HIGH    SOLID
                                         WASTE
                          90/09 MEDIUM   SOLID
                                         WASTE
         ADEQUATE  ADEQUATE   ADEQUATE
          DESIGN    TIMING    ESTIMATE
ADEQUATE  ADEQUATE   ADEQUATE
 DESIGN    TIMING    ESTIMATE
                                                  ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
         ADEQUATE  ADEQUATE   ADEQUATE
          DESIGN    TIMING    ESTIMATE
         ADEQUATE  ADEQUATE   ADEQUATE
          DESIGN    TIMING    ESTIMATE
         ADEQUATE  ADEQUATE   ADEQUATE
          DESIGN    TIMING    ESTIMATE

-------
                                 FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                         DEPARTMENT OF ARMY                      ARMY MATERIAL COMMAND
                PROJECT IDENTIFICATION
                     REQ    EST   PROJECT
  BUDGET     COMPL   COMPL  COMPL ASSESS- MEDIA
(THOUSANDS)   STATUS  DATE   DATE   MENT    TYPE
                                                                                                                      ARMY-115
                            ADEQUACY OF PROJECT
                          ENGIN-
                          EERING    TIME      COST
MO-21332135S PROJECT: AA-SW-44
HAZARDOUS WASTE PICKUP TEAM
ACCT: RDT * E
ABERDEEN PROVING GROUND
ABERDEEN PROVING GROUND          MD

MD-213621355 PROJECT: EA-SW-40
MOLTEN METAL PROCESS HAZ WASTE MINIMIZATION
ACCT: DERA - DMA (OPERATIONS AND MA
ABERDEEN PROVING GROUND
ABERDEEN PROVING GROUND          MD

MD-213821355 PROJECT: AA-TS-54
REMOVE/REPLACE PCB TRANSFORMERS
ACCT: RDT & E
ABERDEEN PROVING GROUND
ABERDEEN PROVING GROUND          MD

MD-213821355 PROJECT: AA-W-67
SHORELINE EROSION SURVEY
ACCT: RDT & E
ABERDEEN PROVING GROUND
ABERDEEN PROVING GROUND          MD

MD-213821355 PROJECT: AA0089S011
STORMWATER AND EROSION CONTROL
ACCT: RDT & E
ABERDEEN PROVING GROUND
ABERDEEN PROVING GROUND          MD

MD-213821355 PROJECT: AA0089S013
NITROGEN REMOVAL
ACCT: RDT » E
ABERDEEN PROVING GROUND
ABERDEEN PROVING GROUND          MO
      700.0  OTHR
    2,280.0  OTHR
90/09 MEDIUM   SOLID
               WASTE
93/07 MEDIUM   SOLID
               WASTE
ADEQUATE  ADEQUATE   ADEQUATE
 DESIGN    TIMING    ESTIMATE
ADEQUATE  ADEQUATE   ADEQUATE
 DESIGN    TIMING    ESTIMATE
    1,000.0  ESDF   93/10  90/10  MEDIUM    TOXIC     ADEQUATE  ADEQUATE   ADEQUATE
                                        SUBSTANCE   DESIGN    TIMING    ESTIMATE
      100.0  ESDP   94/12   93/12   HIGH     WATER    ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
       20.0  ESDP
      500.0   ESDP
90/09  HIGH    WATER    ADEQUATE   ADEQUATE   ADEQUATE
                         DESIGN    TIMING    ESTIMATE
                           90/09   HIGH    WATER    ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE

-------
                                  FEDERAL  AGENCY  POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                          DEPARTMENT OF  ARMY                      ARMY MATERIAL COMMAND
                 PROJECT IDENTIFICATION
                     REQ    EST    PROJECT
  BUDGET     COMPL   COMPL   COMPL  ASSESS- MEDIA
(THOUSANDS)   STATUS   DATE    DATE   MENT    TYPE
                                                                     ARMY-116
                            ADEQUACY OF  PROJECT
                          ENGIN-
                          EERING    TIME      COST
 MD-213821355 PROJECT:  AA0089S014
 NPDES MONITORING
 ACCT:  RDT & E
 ABERDEEN PROVING GROUND
 ABERDEEN PROVING GROUND
                                                      220.0  ESDP
                                                                           90/09  HIGH    WATER
                                 MD
 MD-213821355  PROJECT:  A060M
 STUDY  OF  FUEL STORAGE  SPILL CONTAINMENT
 ACCT:  RDT S, E
 ABERDEEN  PROVING GROUND
 ABERDEEN  PROVING GROUND          MD

 MD-213821355  PROJECT:  A060P
 WETLANDS  STUDY/GEOGRAPHIC INFO. SYSTEM (SIS)
 ACCT:  RDT  & E
 ABERDEEN  PROVING GROUND
 ABERDEEN  PROVING GROUND          MD

 MD-213821355  PROJECT:  AA-W-47
 CHESAPEAKE BAY ENHANCEMENT
 ACCT:  RDT  & E
 ABERDEEN  PROVING GROUND
 ABERDEEN PROVING GROUND          MD

 MD-213822762 PROJECT:  HD0089S003
 INSTALL SPILL AND OVERFILL PROTECTION
 ACCT: RDT  & E
 HARRY DIAMOND LABS
ADELPHI                          MD

MD-213822762 PROJECT:  HD0089S002
TEST CATHODIC PROTECTION
ACCT: RDT  & E
HARRY DIAMOND LABS
ADELPHI                          MD
                                                      500.0  ESDP   84/11  90/09  HIGH    WATER
      125.0   ESDP   87/06   90/09  HIGH    WATER
      115.0   ESDL
      250.0   ESDF
                           90/09 MEDIUM   WATER
91/03 MEDIUM   SOLID
               WASTE
       10.0   PSDF   97/12  90/09 MEDIUM   SOLID
                                         WASTE
                                                  ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
                                                  ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
                                                  ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
                                                  ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
ADEQUATE  ADEQUATE   ADEQUATE
 DESIGN    TIMING    ESTIMATE
                        ADEQUATE  ADEQUATE    ADEQUATE
                         DESIGN    TIMING    ESTIMATE

-------
                                 FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                         DEPARTMENT OF ARMY                      ARMY MATERIAL COMMAND
                PROJECT IDENTIFICATION
                     REQ    EST   PROJECT
  BUDGET     COMPL   COMPL  COMPL ASSESS-  MEDIA
(THOUSANDS)  STATUS  DATE   DATE  MENT    TYPE
                                                                                                                     ARMY-117
                            ADEQUACY OF  PROJECT
                          ENGIN-
                          EERING    TIME      COST
MI-213820268 PROJECT: DA-SF-4
INSTALLATION RESTORATION RI/FS t RA
ACCT: DERA - DMA (OPERATIONS AND MA
DETROIT ARSENAL
WARREN                           MI

MN-213820908 PROJECT: A-SF-009A
INSTALLATION RESTORATION RI/FS ft RA
ACCT: DERA - DMA (OPERATIONS AND MA
TWIN CITIES ARMY AMMO PLT
NEW BRIGHTON                     MN

MN-213820908 PROJECT: TC-TS-26
HAZARDOUS WASTE STORAGE FACILITY
ACCT: PAA(PEMA)
TWIN CITIES ARMY AMMO PLT
NEW BRIGHTON                     MN

MO-213820489 PROJECT: LC-SF-32
INSTALLATION RESTORATION SURVEY
ACCT: DERA - DMA (OPERATIONS AND MA
LAKE CITY ARMY AMMO PLT
INDEPENDENCE                     MO

M0-213820
-------
                                  FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR  1991

                          DEPARTMENT  OF ARMY                      ARMY MATERIAL COMMAND
                 PROJECT IDENTIFICATION
                    REQ    EST   PROJECT
  BUDGET     COMPL   COMPL  COMPL ASSESS- MEDIA
(THOUSANDS)   STATUS  DATE   DATE  MENT    TYPE
                                                                                                                     ARMY-US
                            ADEQUACY  OF  PROJECT
                          ENGIN-
                          EERING   TIME      COST
 MD-213820489 PROJECT:  LC-SW-71
 RESOURCE  RECOVERY  OIL  PROCESS EQUIPMENT
 ACCT:  PAA(PEMA)
 LAKE  CITY ARMY AMMO  PLT
 INDEPENDENCE                    MO

 ra-213920489 PROJECT:  LC-W-50
 BUILD  HOLDING AREA FOR LANDFILL LEACHATE
 ACCT:  PAA(PEMA)
 LAKE CITY ARMY AMMO  PLT
 INDEPENDENCE                     MO

 MO-213820489  PROJECT: LC-W-82
 BUILDING  160C SECONDARY SPILL CONTAINMENT
 ACCT:  PAA(PEMA)
 LAKE CITY  ARMY AMMO  PLT
 INDEPENDENCE                     MO

 MO-2138204S9  PROJECT: LC-W-47
 LEAD AND  OIL REMOVAL SYSTEM
 ACCT:  PAA(PEMA)
 LAKE CITY  ARMY AMMO PLT
 INDEPENDENCE                     MO

 NE-213820234  PROJECT: A-SF-003A
 INSTALLATION RESTORATION SURVEY & CLEAN UP
 ACCT: DERA - DMA (OPERATIONS AND MA
 CORNHUSKER ARMY AMMO PLT
 GRAND  ISLAND                     NE

NJ-213820704 PROJECT: PI0089S025
AIR STUDY/LABORATORY HOOD EMMISSIONS
ACCT: RDT  & E
PICATINNY ARSENAL
DOVER                            NJ
                                                       55.0  OTHR
       55.0   ESDP
       31.0  ESDF
      174.0  ESRO
                          90/09 MEDIUM   SOLID
                                         WASTE
                          90/09  HIGH    WATER
                          90/09 MEDIUM   WATER
                          90/09 MEDIUM   WATER
       25.0  ESDF   90/09  90/09  HIGH    CERCLA
                          NOT
                         AVAIL
                                                    NOT
                                                   AVAIL
                                                    NOT
                                                   AVAIL
                                                    NOT
                                                   AVAIL
                                                    NOT
                                                   AVAIL
 NOT
AVAIL
                                    NOT
                                   AVAIL
                                    NOT
                                   AVAIL
                                    NOT
                                   AVAIL
                                  OVERDUE
                                   TIMING
    1,000.0  ESRO
90/09  LOW      AIR
                                                  ADEQUATE  ADEQUATE
                                                   DESIGN    TIMING
 NOT
AVAIL
            NOT
           AVAIL
            NOT
           AVAIL
            NOT
           AVAIL
            LOW
          ESTIMATE
                                             ADEQUATE
                                             ESTIMATE

-------
                                 FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                         DEPARTMENT OF ARMY                      ARMY MATERIAL COMMAND
                PROJECT IDENTIFICATION
                     REQ    EST   PROJECT
  BUDGET     COMPL   COMPL  COMPL ASSESS- MEDIA
(THOUSANDS)  STATUS  DATE   DATE   MENT    TYPE
                                                                                                                     ARMY-119
                            ADEQUACY OF  PROJECT
                          ENGIN-
                          EERING     TIME      COST
NJ-213820704 PROJECT: PI0089S013
RADON GAS STUDY AND REMEDIATION
ACCT: RDT 4 E
PICATINNY ARSENAL
DOVER                            NJ

NJ-213320704 PROJECT: PI0089S021
NOISE/ICUZ STUDY AND INSTRUMENTATION
ACCT: RDT Jl E
PICATINNY ARSENAL
DOVER                            NJ

NJ-213820704 PROJECT: PI-SF-44
INSTALLATION RESTORATION RI/FS & RA
ACCT: DERA - DMA (OPERATIONS AND MA
PICATINNY ARSENAL
DOVER                            NJ

NJ-213820704 PROJECT: PI-W-11
ENVIRON RESTORATION OF CONTAM EXPLOSIVE MF (TEC
ACCT: RDT i E
PICATINNY ARSENAL
DOVER                            NJ

NJ-213820704 PROJECT: PI0089S012
REMEDIATION OF SITES
ACCT: DERA - OMA (OPERATIONS AND MA
PICATINNY ARSENAL
DOVER                            NJ

NJ-213S20704 PROJECT: PI0089S008
IMPLEMENTATION OF RI/FS CONCEPT PLAN
ACCT: DERA - OMA (OPERATIONS AND MA
PICATINNY ARSENAL
DOVER                            NJ
    1,000.0  OTHR
       50.0  PSDF
90/09 MEDIUM    AIR
                           90/09 MEDIUM   NOISE
ADEQUATE  ADEQUATE   ADEQUATE
 DESIGN    TIMING    ESTIMATE
                        ADEQUATE   ADEQUATE    ADEQUATE
                         DESIGN    TIMING    ESTIMATE
    5,000.0  ESDF   90/04  90/09  HIGH     CERCLA    ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
      750.0  PSDF
                           90/09  LOW      CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
    5,000.0  PSDF   93/01   90/09  HIGH
    5,500.0  PSDF   90/04  90/09   HIGH
                                          CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
               CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
                         DESIGN    TIMING    ESTIMATE

-------
                                  FEDERAL  AGENCY  POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                          DEPARTMENT OF  ARMY                      ARMY MATERIAL COMMAND
                 PROJECT IDENTIFICATION
                     REQ     EST   PROJECT
  BUDGET     COMPL    COMPL   COMPL ASSESS- MEDIA
(THOUSANDS)   STATUS   DATE    DATE  MENT    TYPE
                                                                     ARMY-120
                            ADEQUACY OF PROJECT
                          ENGIN-
                          EERING    TIME      COST
 NJ-213820704  PROJECT:  PI0089S002
 EXPLOSIVE  BUILDING  DECONTAMINATION
 ACCT:  DERA -  DMA  (OPERATIONS AND MA
 PICATINNY  ARSENAL
 DOVER                            NJ

 NJ-213820704  PROJECT:  PI0089S001
 HAZARDOUS  WASTE/RCRA CLOSURE
 ACCT:  RDT  X E
 PICATINNY  ARSENAL
 DOVER                            NJ

 NJ-213820704 PROJECT:  PI-SW-39
 OIL /  CHEMICAL SPILL CLEAN-UP (EMERGENCY) C-UP
 ACCT:  RDT  4 E
 PICATINNY  ARSENAL
 DOVER                            NJ

 NJ-213820704 PROJECT:  PI-SW-41
 TESTING FOR CONTAMINANTS AND DISPOSAL
 ACCT: RDT  i E
 PICATINNY  ARSENAL
 DOVER                            NJ

 NJ-213820704 PROJECT:  PI0089S005
 HAZARDOUS WASTE TRACKING SYSTEM
 ACCT: DERA - OMA  (OPERATIONS AND MA
 PICATINNY ARSENAL
DOVER                            NJ

NJ-213820704 PROJECT:  PI0089S006
UST PROGRAM (REMOVE/REPLACE)
ACCT: RDT & E
 PICATINNY ARSENAL
DOVER                            NJ
                                                      750.0  OTHR
    2,500.0   CMPA
                           90/09   LOW     CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
90/09  HIGH    SOLID     ADEQUATE  ADEQUATE   ADEQUATE
               WASTE      DESIGN    TIMING    ESTIMATE
      325.0   ESDF    92/11  90/09  HIGH
    1,000.0   PSDF
       25.0   PSDF
     400.0  PSDF
                          90/09  HIGH
                                         SOLID    ADEQUATE  ADEQUATE   ADEQUATE
                                         WASTE     DESIGN    TIMING    ESTIMATE
               SOLID     ADEQUATE  ADEQUATE   ADEQUATE
               WASTE      DESIGN     TIMING    ESTIMATE
                          90/09  HIGH    SOLID    ADEQUATE  ADEQUATE   ADEQUATE
                                         WASTE     DESIGN    TIMING    ESTIMATE
                          90/09  HIGH    SOLID    ADEQUATE  ADEQUATE   ADEQUATE
                                         WASTE     DESIGN    TIMING    ESTIMATE

-------
                                 FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                         DEPARTMENT OF ARMY                      ARMY MATERIAL COMMAND
                PROJECT IDENTIFICATION
                     REQ    E3T   PROJECT
  BUDGET     COMPL   COMPL  COMPL ASSESS- MEDIA
(THOUSANDS)  STATUS  DATE   DATE  MENT    TYPE
                                                                                                                      ARMY-121
                            ADEQUACY  OF  PROJECT
                          ENGIN-
                          EERING   TIME      COST
NJ-213820704 PROJECT: PI0089S007
DISPOSAL OF HAZARDOUS/NONHAZARDOUS WASTE
ACCT: RDT & E
PICATINNY ARSENAL
DOVER                            NJ

NJ-213820704 PROJECT: PI0089S020
ENERGETIC DISPOSAL FACILITY
ACCT: RDT & E
PICATINNY ARSENAL
DOVER                            NJ

NJ-213820704 PROJECT: PI-A-37
ASBESTOS REMOVAL PROGRAM INTERIOR
ACCT: RDT & E
PICATINNY ARSENAL
DOVER                            NJ

NJ-213820704 PROJECT: PI-W-24
SANITARY SEWER REHABILITATION
ACCT: RDT t. E
PICATINNY ARSENAL
DOVER                            NJ

NJ-213820704 PROJECT: PI0089S009
REMEDIATION OF BLDG 24 TCE PLUME
ACCT: DERA - DMA (OPERATIONS AND MA
PICATINNY ARSENAL
DOVER                            NJ

NJ-213820704 PROJECT: PI0089S014
COMPLIANCE WITH RVR SEWAGE AUTHORITY
ACCT: RDT « E
PICATINNY ARSENAL
DOVER                            NJ
      400.0  PSDF
    1,500.0  OTHR
    3,500.0  ESDL
                           90/09  HIGH     SOLID
                                          WASTE
90/09 MEDIUM   SOLID
               WASTE
90/09 MEDIUM   TOXIC
             SUBSTANCE
      341.0  ESDF   90/09  90/09  MEDIUM    WATER
      500.0  ESDF   90/12   90/09   HIGH    WATER
      250.0  PSDF
                           90/09   HIGH    WATER
                        ADEQUATE  ADEQUATE    ADEQUATE
                         DESIGN    TIMING    ESTIMATE
ADEQUATE  ADEQUATE   ADEQUATE
 DESIGN    TIMING    ESTIMATE
ADEQUATE  ADEQUATE   ADEQUATE
 DESIGN    TIMING    ESTIMATE
                        ADEQUATE   ADEQUATE   ADEQUATE
                         DESIGN    TIMING    ESTIMATE
                        ADEQUATE   ADEQUATE   ADEQUATE
                         DESIGN    TIMING    ESTIMATE
                        ADEQUATE   ADEQUATE   ADEQUATE
                         DESIGN    TIMING    ESTIMATE

-------
                                  FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                          DEPARTMENT OF ARMY                      ARMY MATERIAL COMMAND
                 PROJECT  IDENTIFICATION
                                    REQ    EST   PROJECT
                 BUDGET     COMPL   COMPL  COMPL ASSESS- MEDIA
               (THOUSANDS)  STATUS  DATE   DATE  MENT    TYPE
                                                                                    ARMY-122
                            ADEQUACY  OF  PROJECT
                          ENGIN-
                          EERING    TIME     COST
 NJ-21382070-4  PROJECT:  PI0089S015
 STORM  HATER DISCHARGE  PERMITS
 ACCT:  RDT  & E
 PICATINNY  ARSENAL
 DOVER                            NJ

 NJ-21382070-4  PROJECT:  PI-W-43
 WATER/WASTE WATER ANALYSIS
 ACCT:  RDT  & E
 PICATINNY  ARSENAL
 DOVER                            NJ

 NJ-213820704  PROJECT:  A-TS-5K
 HAZARDOUS  MATL SPILL CONTROL BLDG 67
 ACCT:  RDT  S E
 PICATINNY  ARSENAL
 DOVER                            NJ
NJ-213820704 PROJECT: PI0069S023
NJDEP PERMITS/FEES
ACCT: RDT « E
PICATINNY ARSENAL
DOVER
NM-213820960 PROJECT: WIOOS9S007
ASBESTIS ABATEMENT
ACCT: RDT & E
WHITE SANDS MISSILE RANGE
WSMR
NJ
NM
NM-213820960 PROJECT: WI-DW-14
MONITORING OF DRINKING WATER SUPPLIES
ACCT: DMA OPERATIONS & MAINT.ARMY
WHITE SANDS MISSILE RANGE
WSMR                             NM
                                                      500.0  PSDF
                     560.0  PSDF
                     111.0  PSDF
                                                       50.0  OTHR
                   3,000.0  ESDL
                                                      150.0  ESDF
                                          90/09 MEDIUM   WATER     ADEQUATE  ADEQUATE   ADEQUATE
                                                                   DESIGN    TIMING    ESTIMATE
                                          90/09 MEDIUM   WATER     ADEQUATE  ADEQUATE   ADEQUATE
                                                                   DESIGN     TIMING    ESTIMATE
                                          90/09  HIGH    WATER
                                          90/09 MEDIUM   WATER
90/09 MEDIUM    AIR
                                                                  ADEQUATE   ADEQUATE    ADEQUATE
                                                                   DESIGN     TIMING     ESTIMATE
                                                                  ADEQUATE   ADEQUATE    ADEQUATE
                                                                   DESIGN    TIMING     ESTIMATE
                          OVER    ADEQUATE      HIGH
                         DESIGN    TIMING    ESTIMATE
                                          90/09 MEDIUM  DRINKING  ADEQUATE   ADEQUATE    ADEQUATE
                                                         WATER     DESIGN    TIMING    ESTIMATE

-------
                                 FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR  1991

                         DEPARTMENT OF ARMY                      ARMY MATERIAL COMMAND
                PROJECT IDENTIFICATION
                     REQ    EST    PROJECT
  BUDGET     COMPL   COMPL  COMPL  ASSESS- MEDIA
(THOUSANDS)   STATUS  DATE    DATE   MENT    TYPE
                                                                                                                     ARMY-123
                            ADEQUACY OF  PROJECT
                          ENGIN-
                          EERING    TIME      COST
NM-213820960 PROJECT: WI-MM-8
ARCHEOLOGICAL SURVEYS
ACCT: ROT & E
WHITE SANDS MISSILE RANGE
WSMR
                                 NM
NM-213820960 PROJECT: WI-W-7
STUDY OF EFFCT OF 2,4-D ON TULAROSA PUPFIS
ACCT: RDT & E
WHITE SANDS MISSILE RANGE
WSMR                             NM
      497.0   ESDP
       20.0   ESDP
90/09 MEDIUM  MULTI
              MEDIA
90/09  HIGH   MULTI
              MEDIA
ADEQUATE  ADEQUATE   ADEQUATE
 DESIGN    TIMING    ESTIMATE
ADEQUATE  ADEQUATE   ADEQUATE
 DESIGN    TIMING    ESTIMATE
NM-213820960 PROJECT: WI0089S011
CONTRACT LABORATORY SUPPORT
ACCT: RDT & E
WHITE SANDS MISSILE RANGE
WSMR                             NM

NM-213820960 PROJECT: WI-SF-11
MONITORING FOR UNDERGROUND WATER CONTAMINA
ACCT: RDT & E
WHITE SANDS MISSILE RANGE
WSMR                             NM

NM-213820960 PROJECT: WI-SW-13
METHYLENE CHLORIDE CLEAN-UP
ACCT: RDT * E
WHITE SANDS MISSILE RANGE
WSMR                             NM

NM-213820960 PROJECT: WI0089S004
HAZARDOUS WASTE DISPOSAL
ACCT: RDT & E
WHITE SANDS MISSILE RANGE
WSMR                             NM
       50.0   OTHR
       60.0   ESDF
                           90/09 MEDIUM  MULTI     ADEQUATE  ADEQUATE   ADEQUATE
                                        MEDIA      DESIGN    TIMING    ESTIMATE
                           90/09 MEDIUM   CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
       50.0  INOV   88/06   90/09  HIGH
       90.0   ESDP
                           90/09  HIGH
                                         SOLID    ADEQUATE  ADEQUATE   ADEQUATE
                                         WASTE     DESIGN    TIMING    ESTIMATE
                                         SOLID    ADEQUATE  ADEQUATE   ADEQUATE
                                         WASTE     DESIGN    TIMING    ESTIMATE

-------
                                  FEDERAL AGENCY  POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                          DEPARTMENT OF  ARMY                      ARMY MATERIAL COMMAND
                 PROJECT IDENTIFICATION
                     REQ    EST    PROJECT
  BUDGET     COMPL   COMPL   COMPL  ASSESS- MEDIA
(THOUSANDS)   STATUS   DATE    DATE   MENT    TYPE
                                                                     ARMY-124
    ADEQUACY OF PROJECT
  ENGIN-
  EERING    TIME      COST
 NM-213820960 PROJECT:  WI0089S006
 HAZARDOUS WASTE  LANDFILL CLOSURE
 ACCT:  RDT £ E
 WHITE  SANDS MISSILE  RANGE
 WSMR                             NM

 NM-213820960 PROJECT:  WI0089S012
 SOLID  WASTE MANAGEMENT CLOSURE
 ACCT:  RDT & E
 WHITE  SANDS MISSILE  RANGE
 WSMR                             NM

 NM-213820960 PROJECT:  WI0089S014
 CLOSURE OF  HAZARDOUS HASTE EVAPORATION TANKS
 ACCT:  RDT  & E
 WHITE  SANDS MISSILE  RANGE
 WSMR                             NM

 NM-213820960  PROJECT:  WI0089S005
 RECYCLING  PROJECT RESEARCH AND DEVELOPMENT
 ACCT: RDT  &  E
 WHITE SANDS  MISSILE  RANGE
 WSMR                             NM

 NM-213820960  PROJECT:  WI-SW-15
 TEST & REPLACE UNDERGROUND STORAGE TANKS
 ACCT: DMA OPERATIONS ft MAINT.ARMY
 WHITE SANDS  MISSILE  RANGE
WSMR                             NM

NM-213820960  PROJECT:  WI-SW-3
SOLID WASTE RECOVERY FROM RANGE LANDS
ACCT: RDT *  f.
WHITE SANDS MISSILE RANGE
WSMR                             NM
                                                       20.0  ESDP
      750.0   ESDP
       10.0   ESDP
       50.0   ESDF
      155.0   ESDF
      50.0  ESDF
                           90/09  HIGH    SOLID
                                         WASTE
                           90/09  HIGH    SOLID
                                         WASTE
                           90/09  HIGH    SOLID
                                         WASTE
                          90/09 MEDIUM   SOLID
                                         WASTE
                          90/09  HIGH    SOLID
                                         WASTE
                          90/09 MEDIUM   SOLID
                                         WASTE
ADEQUATE  ADEQUATE   ADEQUATE
 DESIGN    TIMING    ESTIMATE
ADEQUATE  ADEQUATE   ADEQUATE
 DESIGN    TIMING    ESTIMATE
ADEQUATE  ADEQUATE   ADEQUATE
 DESIGN    TIMING    ESTIMATE
ADEQUATE  ADEQUATE   ADEQUATE
 DESIGN    TIMING    ESTIMATE
ADEQUATE  ADEQUATE   ADEQUATE
 DESIGN    TIMING    ESTIMATE
ADEQUATE  ADEQUATE   ADEQUATE
 DESIGN    TIMING    ESTIMATE

-------
                                 FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                         DEPARTMENT OF ARMY                      ARMY MATERIAL COMMAND
                PROJECT IDENTIFICATION
                     REQ    EST   PROJECT
  BUDGET     COMPL   COMPL  COMPL ASSESS- MEDIA
(THOUSANDS)  STATUS  DATE   DATE  MENT    TYPE
                                                                                                                      ARMY-125
                            ADEQUACY OF PROJECT
                          ENGIN-
                          EERING    TIME      COST
NM-213820960 PROJECT: A-TS-19
UPGRADE TOXIC WASTE STOR/DISP AREA
ACCT: RDT « E
WHITE SANDS MISSILE RANGE
WSMR                             NM

NM-213820960 PROJECT: WI-TS-16
REPLACE OR RETROFIT PCB EQUIPMENT
ACCT: OMA OPERATIONS & MAINT.ARMY
WHITE SANDS MISSILE RANGE
WSMR                             NM

NM-213820960 PROJECT: A724B
UPGRADE EXPLOSIVE WASTE DISPOSAL SITES
ACCT: RDT & E
WHITE SANDS MISSILE RANGE
WSMR                             NM

NM-213820974 PROJECT: FW-A-6
RADON ABATEMENT PROJECTS
ACCT: OMA OPERATIONS & MAINT.ARMY
FORT WINGATE DEPOT ACTIVITY
GALLUP                           NM

NM-213820974 PROJECT: FW0089S001
RADON SURVEY
ACCT: INDUSTRIAL FUND
FORT WINGATE DEPOT ACTIVITY
GALLUP                           NM

NM-21382097<+ PROJECT: FW-A-4
ASBESTOS ABATEMENT PROJECT
ACCT: OMA OPERATIONS & MAINT.ARMY
FORT WINGATE DEPOT ACTIVITY
GALLUP                           NM
       40.0  ESDF   80/11   90/09 MEDIUM   SOLID     ADEQUATE  ADEQUATE   ADEQUATE
                                          HASTE     DESIGN    TIMING    ESTIMATE
       70.0  ESDF   93/10  90/09 MEDIUM   TOXIC     ADEQUATE  ADEQUATE   ADEQUATE
                                        SUBSTANCE   DESIGN    TIMING    ESTIMATE
       86.0  ESDF   77/03  90/09 MEDIUM   WATER    ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
       35.0  ESDF
90/09 MEDIUM    AIR     ADEQUATE   ADEQUATE   ADEQUATE
                         DESIGN    TIMING    ESTIMATE
       19.0   ESDF    90/06   90/09 MEDIUM
       42.0   ESDL
                           90/09  MEDIUM
                AIR     ADEQUATE   ADEQUATE   ADEQUATE
                         DESIGN    TIMING    ESTIMATE
                AIR     ADEQUATE   ADEQUATE   ADEQUATE
                         DESIGN    TIMING    ESTIMATE

-------
                                  FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                          DEPARTMENT  OF ARMY                      ARMY MATERIAL COMMAND
                 PROJECT IDENTIFICATION
                     REG)     EST   PROJECT
  BUDGET     COMPL   COMPL   COMPL ASSESS- MEDIA
(THOUSANDS)   STATUS   DATE    DATE  MENT    TYPE
                                                                                                                     ARMY-126
  ADEQUACY OF PROJECT
ENGIN-
EERING    TIME      COST
 NM-213820974 PROJECT:  FW0069S003
 HAZARDOUS WASTE  DISPOSAL
 ACCT:  INDUSTRIAL FUND
 FORT WINGATE DEPOT  ACTIVITY
 GALLUP                          NM

 NY-213820830 PROJECT:  SE-A-25
 RADON  ABATEMENT  PROJECTS
 ACCT:  OKA OPERATIONS & MAINT.ARMY
 SENECA ARMY  DEPOT
 GENEVA                          NY

 NY-213820830  PROJECT: SE-SF-21
 ASH  LANDFILL  4 OTHER SWMU'S
 ACCT:  DERA -  DMA (OPERATIONS AND MA
 SENECA ARMY DEPOT
 GENEVA                           NY

 NY-213820830  PROJECT: SE-SW-19
 OBOD,  IMPROVE HAZ WASTE MGT.
 ACCT:  INDUSTRIAL FUND
 SENECA ARMY DEPOT
 GENEVA                           NY

 NY-213820830  PROJECT: SE-SW-29
 INSTALL & SAMPLE GROUNDWATER MONITORING SYS
ACCT: INDUSTRIAL FUND
 SENECA ARMY DEPOT
GENEVA                           NY

NY-213820830  PROJECT: SE-SW-37
HAZARDOUS WAST DISPOSAL
ACCT: INDUSTRIAL FUND
SENECA ARMY DEPOT
GENEVA                           NY
                                                       10.0  CMPA
                           90/09  HIGH    SOLID    ADEQUATE  ADEQUAYE   ADEQUATE
                                         WASTE     DESIGN    TIMING    ESTIMATE
       73.0   ESDF    90/06   90/09  HIGH     AIR     ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
      150.0   ESDF    92/11  90/09  HIGH
    1,000.0   ESDF    92/11  90/09  HIGH
      100.0   PSDF
      100.0   PSDF
                          90/09  HIGH
                          90/09  HIGH
                                         CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
                                         SOLID    ADEQUATE  ADEQUATE   ADEQUATE
                                         WASTE     DESIGN    TIMING    ESTIMATE
                                         SOLID    ADEQUATE  ADEQUATE   ADEQUATE
                                         WASTE     DESIGN    TIMING    ESTIMATE
                                         SOLID    ADEQUATE  ADEQUATE   ADEQUATE
                                         WASTE     DESIGN    TIMING    ESTIMATE

-------
                                 FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                         DEPARTMENT OF ARMY                      ARMY MATERIAL COMMAND
                PROJECT IDENTIFICATION
                     REQ    EST   PROJECT
  BUDGET     COMPL   COMPL  COMPL ASSESS-  MEDIA
(THOUSANDS)  STATUS  DATE   DATE   MENT     TYPE
                                                                                                                      ARMY-127
                            ADEQUACY OF PROJECT
                          ENGIN-
                          EERING    TIME      COST
NY-213820830 PROJECT: SE0089S002
SPT LUST/RADON SURVEYS/HA2MAT TRAINING
ACCT: INDUSTRIAL FUND
SENECA ARMY DEPOT
GENEVA                           NY

NY-213820830 PROJECT: SE-A-23
ASBESTOS ABATEMENT PROJECT
ACCT: OMA OPERATIONS & MAINT.ARMY
SENECA ARMY DEPOT
GENEVA                           NY

NY-213820830 PROJECT: SE-M-30
HAZ MATERIAL TRAINING & EQUIPMENT
ACCT: INDUSTRIAL FUND
SENECA ARMY DEPOT
GENEVA                           NY

NY-213820940 PROJECT: WA0089S007
ASBESTOS REMOVAL VARIOUS LOCATIONS
ACCT: INDUSTRIAL FUND
WATERVLIET ARSENAL
WATERVLIET                       NY

NY-213820940 PROJECT: WA0089S011
REPLACE UNDERGROUND TANKS
ACCT: INDUSTRIAL FUND
WATERVLIET ARSENAL
WATERVLIET                       NY

OH-213820510 PROJECT: LI-SW-14
UNDERGROUND STORAGE TANK REMOVAL & IMPROVE
ACCT: PAA(PEMA)
LIMA ARMY TANK PLANT
LIMA                             OH
      106.0  OTHR
       51.0  PSDF
      150.0  OTHR
      250.0  OTHR
       85.0  PSDF
                           90/09  LOW      SOLID    ADEQUATE  ADEQUATE   ADEQUATE
                                          WASTE     DESIGN    TIMING    ESTIMATE
90/09 MEDIUM   TOXIC    ADEQUATE  ADEQUATE   ADEQUATE
             SUBSTANCE   DESIGN    TIMING    ESTIMATE
                           90/09  MEDIUM   WATER    ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
90/09 MEDIUM   TOXIC    ADEQUATE   ADEQUATE   ADEQUATE
             SUBSTANCE   DESIGN    TIMING    ESTIMATE
                           90/09 MEDIUM   WATER
    1,800.0  ESDL   92/05   91/05   LOW     SOLID
                                         WASTE
                                                  ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
                        ADEQUATE   ADEQUATE   ADEQUATE
                         DESIGN    TIMING    ESTIMATE

-------
                                  FEDERAL AGENCY  POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                          DEPARTMENT OF  ARMY                      ARMY MATERIAL COMMAND
                 PROJECT IDENTIFICATION
                     REQ     EST   PROJECT
  BUDGET     COMPL    COMPL   COMPL ASSESS- MEDIA
(THOUSANDS)   STATUS   DATE    DATE  MENT    TYPE
                                                                                                                     ARMY-128
                            ADEQUACY  OF  PROJECT
                          ENGIN-
                          EERING   TIME      COST
 OK-213822951  PROJECT:  ML-SF-4
 REMOVE  AND  DISPOSE  UNEXPLODED  ORDINANCE
 ACCT: PAA(PEMA)
 MCALESTER ARMY AMMO PLT
 MCALESTER                        OK

 OK-213822951  PROJECT:  ML0089S002
 GROUNDWATER MONITORING
 ACCT: INDUSTRIAL FUND
 MCALESTER ARMY AMMO PLT
 MCALESTER                        OK

 OK-213822951  PROJECT:  ML0089S009
 PINKWATER LAGOON CLOSURE
 ACCT: DERA -  DMA (OPERATIONS AND MA
 MCALESTER ARMY AMMO  PLT
 MCALESTER                        OK

 OR-213820917  PROJECT:  UM0089S002
 CONDUCT RADON SURVEYS
 ACCT: INDUSTRIAL FUND
 UMATILLA DEPOT ACTIVITY
 HERMISTON                        OR

 OR-213820917  PROJECT:  UM0099S009
 WATER SYSTEM  MONITORING AND TESTING
ACCT: INDUSTRIAL FUND
UMATILLA DEPOT ACTIVITY
HERMISTON                        OR

OR-213820917  PROJECT: UM-SF-16
 INST RESTORATION REMEDIAL RI/FS & RA
ACCT: DERA - DMA (OPERATIONS AND MA
UMATILLA DEPOT ACTIVITY
HERMISTON                        OR
      200.0   ESDF    87/09   90/09 MEDIUM   CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
       50.0   ESDP
      300.0   ESDP
       30.0  OTHR
      100.0  CMPA
   3,000.0  CMPA
                          90/09  HIGH    WATER    ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
                          90/09  HIGH    WATER
                          90/09 MEDIUM    AIR
                                                  ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
                                                  ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
                          90/09  HIGH   DRINKING  ADEQUATE  ADEQUATE   ADEQUATE
                                         WATER     DESIGN    TIMING    ESTIMATE
90/09  HIGH    CERCLA   ADEQUATE  ADEQUATE    ADEQUATE
                         DESIGN    TIMING     ESTIMATE

-------
                                 FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                         DEPARTMENT OF ARMY                      ARMY MATERIAL COMMAND
                PROJECT IDENTIFICATION
                                    REQ    EST   PROJECT
                 BUDGET     COMPL   COMPL  COMPL ASSESS- MEDIA
               (THOUSANDS)  STATUS  DATE   DATE  MENT    TYPE
                                                                                                                     ARMY-129
                            ADEQUACY OF  PROJECT
                          ENGIN-
                          EERING    TIME      COST
OR-213820917 PROJECT: UM-SF-1
CLOSURE OF EXPLOSIVES WASHOUT LAGOONS (2EA),
ACCT: DERA - DMA (OPERATIONS AND MA
UMATILLA DEPOT ACTIVITY
HERMISTON                        OR

OR-213820917 PROJECT: UM0089S004
HAZARDOUS WASTE DISPOSAL
ACCT: INDUSTRIAL FUND
UMATILLA DEPOT ACTIVITY
HERMISTON                        OR

OR-213820917 PROJECT: UM-SW-7
UPGRADE M55 ROCKET STORAGE IGLOOS & J-BLOCK
ACCT: MILCON.ARMY (MCA)
UMATILLA DEPOT ACTIVITY
HESMISTON                        OR

OR-213820917 PROJECT: UM-A-19
ASBESTOS ABATEMENT PROJECT
ACCT: DMA OPERATIONS & MAINT.ARMY
UMATILLA DEPOT ACTIVITY
HERMISTON                        OR
PA-213820503 PROJECT: LK-A-25
ASBESTOS ABATEMENT PROJECT
ACCT: INDUSTRIAL FUND
LETTERKENNY ARMY DEPOT
CHAMBERSBURG
PA-213820503 PROJECT: LK-A-35
ASBESTOS SURVEY
ACCT: INDUSTRIAL FUND
LETTERKENNY ARMY DEPOT
CHAMBERSBURG
PA
PA
                   2,000.0  CMPA
                      15.0  CMPA
                       2.0  INOV
                     116.0  ESDF
                                                      520.0  ESDF
                   3,000.0  ESDF
90/09  HIGH    CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
                         DESIGN    TIMING    ESTIMATE
                                          90/09  HIGH     SOLID     ADEQUATE  ADEQUATE   ADEQUATE
                                                         WASTE     DESIGN    TIMING    ESTIMATE
90/09  HIGH    SOLID    ADEQUATE  ADEQUATE    ADEQUATE
               WASTE     DESIGN    TIMING    ESTIMATE
90/09 MEDIUM   TOXIC    ADEQUATE   ADEQUATE   ADEQUATE
             SUBSTANCE   DESIGN    TIMING    ESTIMATE
                                          90/09 MEDIUM    AIR
                                                                 ADEQUATE  ADEQUATE   ADEQUATE
                                                                  DESIGN    TIMING    ESTIMATE
90/09 MEDIUM    AIR      ADEQUATE  ADEQUATE   ADEQUATE
                         DESIGN    TIMING    ESTIMATE

-------
                                  FEDERAL  AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                          DEPARTMENT  OF ARMY                      ARMY MATERIAL COMMAND
                 PROJECT IDENTIFICATION
                     REQ    EST   PROJECT
  BUDGET     COMPL    COMPL  COMPL ASSESS- MEDIA
(THOUSANDS)   STATUS   DATE   DATE  MENT    TYPE
                                                                                                                     ARMY-130
  ADEQUACY OF PROJECT
ENGIN-
EERING    TIME      COST
 PA-213820503 PROJECT:  LK-A-36
 EMERGENCY  ASBESTOS  ABATEMENT PROJECTS DEPOT WID
 ACCT:  OMA  OPERATIONS &  MAINT,ARMY
 LETTERKENNY  ARMY  DEPOT
 CHAMBERSBUR6                    PA

 PA-213820503 PROJECT: LK-DW-29
 SAMPLING AND ANALYSIS OF DRINKING WATER
 ACCT:  INDUSTRIAL  FUND
 LETTERKENNY  ARMY  DEPOT
 CHAMBERSBURG                    PA

 PA-213820503 PROJECT: LK-DW-28
 INSTALL CROSS FLOW PREVENTION DEVICES
 ACCT:  INDUSTRIAL  FUND
 LETTERKENNY  ARMY  DEPOT
 CHAMBERSBURG                     PA

 PA-213820503 PROJECT: LK0089S028
 REPLACE FILTER SYSTEM WATER TREATMENT PLANT
 ACCT: INDUSTRIAL  FUND
 LETTERKENNY ARMY DEPOT
 CHAMBERSBURG                     PA

 PA-213820503 PROJECT: LK-A-27
RADON ABATEMENT PROJECTS-REMEDIATION
ACCT: OMA OPERATIONS & MAINT.ARMY
 LETTERKENNY ARMY DEPOT
CHAMBERSBURG                     PA

PA-213S20503 PROJECT: LK-A-26
RADON SURVEYS
ACCT: INDUSTRIAL FUND
 LETTERKENNY ARMY DEPOT
CHAMBERSBURG                     PA
                                                       27.0  OTHR
                          90/09  HIGH     AIR     ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
       50.0   CMPA   92/12  90/09  HIGH   DRINKING  ADEQUATE  ADEQUATE   ADEQUATE
                                         WATER     DESIGN    TIMING    ESTIMATE
    1,500.0   INOV   89/01  90/09  HIGH   DRINKING  ADEQUATE  ADEQUATE   ADEQUATE
                                         WATER     DESIGN    TIMING    ESTIMATE
       25.0   PSDF
      42.0   ESDF
      163.0  OTHR
                          90/09 MEDIUM  DRINKING  ADEQUATE  ADEQUATE   ADEQUATE
                                         WATER     DESIGN    TIMING    ESTIMATE
                          90/11 MEDIUM RADIATION  ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
                          90/09 MEDIUM RADIATION  ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE

-------
                                 FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                         DEPARTMENT OF ARMY                      ARMY MATERIAL COMMAND
                PROJECT IDENTIFICATION
                     REQ    EST   PROJECT
  BUDGET     COMPL   COMPL  COMPL ASSESS- MEDIA
(THOUSANDS)   STATUS  DATE    DATE   MENT    TYPE
                                                                                                                     ARMY-131
                            ADEQUACY OF PROJECT
                          ENGIN-
                          EERING    TIME      COST
PA-213820503 PROJECT: LK0089S006
INSTALLATION SUPPORT
ACCT: DERA - OMA (OPERATIONS AND MA
LETTERKENNY ARMY DEPOT
CHAMBERSBURG                     PA

PA-213820503 PROJECT: LK0089S003
INTERIM REMEDIAL ACTION OPERATIONS
ACCT: INDUSTRIAL FUND
LETTERKENNY ARMY DEPOT
CHAMBERSBURG                     PA

PA-213820503 PROJECT: LK-W-11
LEAD INSTALLATION RESTORATION PROGRAM
ACCT: DERA - OMA (OPERATIONS AND MA
LETTERKENNY ARMY DEPOT
CHAMBERSBURG                     PA

PA-213820503 PROJECT: A039B
INSTALLATION RESTORATION SURVEY t CLEANUP
ACCT: DERA - OMA (OPERATIONS AND MA
LETTERKENNY ARMY DEPOT
CHAMBERSBURG                     PA

PA-213320503 PROJECT: LK0089S005
MONITORING/PERMITS
ACCT: DERA - OMA (OPERATIONS AND MA
LETTERKENNY ARMY DEPOT
CHAMBERSBURG                     PA

PA-213820503 PROJECT: LK-SW-18
HAZARDOUS WASTE DISPOSAL
ACCT: INDUSTRIAL FUND
LETTERKENNY ARMY DEPOT
CHAMBERSBURG                     PA
       50.0  CMPA   90/08  90/09  HIGH
      500.0  CMPA   90/08  90/09  HIGH
               CERCLA   ADEQUATE  ADEQUATE    ADEQUATE
                         DESIGN    TIMING    ESTIMATE
               CERCLA   ADEQUATE  ADEQUATE    ADEQUATE
                         DESIGN    TIMING    ESTIMATE
    6,500.0  CMPA
90/09  HIGH    CERCLA   ADEQUATE  ADEQUATE    ADEQUATE
                         DESIGN    TIMING    ESTIMATE
      500.0  ESDF   68/04   90/09 MEDIUM   CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
       50.0  PSDF   89/07  90/09 MEDIUM   CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
    3,375.0  CMPA
90/09  HIGH    SOLID     ADEQUATE  ADEQUATE   ADEQUATE
               WASTE      DESIGN    TIMING    ESTIMATE

-------
                                  FEDERAL AGENCY  POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                          DEPARTMENT OF  ARMY                      ARMY MATERIAL COMMAND
                 PROJECT IDENTIFICATION
                     REQ     EST   PROJECT
  BUDGET     COMPL    COMPL   COMPL ASSESS- MEDIA
(THOUSANDS)   STATUS   DATE    DATE  MENT    TYPE
                                                                     ARMY-132
                            ADEQUACY  OF  PROJECT
                          ENGIN-
                          EERING   TIME      COST
 PA-213320503 PROJECT:  LK-SF-8
 GROUNDWATER SAMPLING/ANALYSIS FOR  RCRA
 ACCT:  INDUSTRIAL  FUND
 LETTERKENNY ARMY  DEPOT
 CHAMBERSBURG                    PA

 PA-213820503 PROJECT:  LK-SW-12
 CLOSURE  LEAD STORAGE LAGOONS  IAW RCRA
 ACCT:  DERA  - DMA  (OPERATIONS  AND MA
 LETTERKENNY ARMY  DEPOT
 CHAMBERSBURG                    PA

 PA-213820503 PROJECT:  LK-SW-14
 INSTALL  GROUND WATER MONITORING WELLS-AMMO
 ACCT:  INDUSTRIAL  FUND
 LETTERKENNY  ARMY  DEPOT
 CHAMBERSBURG                    PA

 PA-213620503 PROJECT:  LK0089S020
 UPGRADE RCRA HW STORAGE AREAS
 ACCT;  INDUSTRIAL  FUND
 LETTERKENNY  ARMY  DEPOT
 CHAMBERSBURG                    PA

 PA-213820503  PROJECT:  LK0089S019
 NONHAZARDOUS  INDUSTRIAL WASTE DISPOSAL STUDY
 ACCT:  INDUSTRIAL  FUND
 LETTERKENNY  ARMY  DEPOT
 CHAMBERSBURG                     PA

 PA-213820503  PROJECT:  LK-SW-19
 PREPARE 8 IMPLEMENT CLOSURE/POST CLOSURE PLAN
ACCT:  INDUSTRIAL  FUND
 LETTERKENNY  ARMY  DEPOT
CHAMBERSBURG                     PA
                                                       40.0  CMPA
                           90/09  HIGH    SOLID
                                         WASTE
      100.0   CMPA   89/11  90/09  HIGH    SOLID
                                         WASTE
      150.0   INOV    92/11  90/09  HIGH
      175.0   INOV   89/11  91/05  HIGH
      50.0   ESDP   88/11  91/03  HIGH
   4,500.0  ESDP
90/12  HIGH
                                         SOLID
                                         WASTE
                                         SOLID
                                         WASTE
                                         SOLID
                                         WASTE
               SOLID
               WASTE
                        ADEQUATE   ADEQUATE    ADEQUATE
                         DESIGN    TIMING     ESTIMATE
                        ADEQUATE   ADEQUATE    ADEQUATE
                         DESIGN    TIMING     ESTIMATE
                        ADEQUATE  ADEQUATE    ADEQUATE
                         DESIGN    TIMING     ESTIMATE
                        ADEQUATE   ADEQUATE    ADEQUATE
                         DESIGN    TIMING     ESTIMATE
                        ADEQUATE  ADEQUATE    ADEQUATE
                         DESIGN    TIMING     ESTIMATE
                                                  ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE

-------
                                 FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                         DEPARTMENT OF ARMY                      ARMY MATERIAL COMMAND
                PROJECT IDENTIFICATION
                     REQ    EST   PROJECT
  BUDGET     COMPL   COMPL  COMPL ASSESS- MEDIA
(THOUSANDS)   STATUS  DATE   DATE   MENT    TYPE
                                                                     ARMY-133
                            ADEQUACY  OF  PROJECT
                          ENGIN-
                          EERING    TIME      COST
PA-213820503 PROJECT: LK-SW-20
TEST/CERTIFY/REMOVE UNDERGROUND STORAGE TAN
ACCT: INDUSTRIAL FUND
LETTERKENNY ARMY DEPOT
CHAMBERSBURG                     PA
      200.0  ESDP
                           90/09  HIGH
                                          SOLID
                                          WASTE
                        ADEQUATE   ADEQUATE    ADEQUATE
                         DESIGN    TIMING     ESTIMATE
PA-213820503 PROJECT: LK-SW-22
UPGRADE DEACT FURNACE CONTROL & PERFORMANCE
ACCT: INDUSTRIAL FUND
LETTERKENNY ARMY DEPOT
CHAMBERSBURS                     PA
    1.000.0  ESDP
90/09  HIGH
               SOLID
               WASTE
                                                  ADEQUATE  ADEQUATE
                                                   DESIGN    TIMING
ADEQUATE
ESTIMATE
PA-213820503 PROJECT: LK-SW-17                        100.0  ESDP
HAZMIN DESIGN AND CONSTRUCT SPENT SOLVENT R. UN
ACCT: DERA - DMA (OPERATIONS AND MA
LETTERKENNY ARMY DEPOT
CHAMBERSBURG                     PA

PA-213820503 PROJECT: A098H                           170.0  ESDP
CONSTRUCT OIL & HAZ MATERIAL STOR AREAS
ACCT: INDUSTRIAL FUND
LETTERKENNY ARMY DEPOT
CHAMBERSBURG                     PA

PA-213820503 PROJECT: LK-SW-13
HAZMIN-RESEARCH RSD DISP PCP CONTAMINATION BY B
ACCT: DERA - DMA (OPERATIONS AND MA
LETTERKENNY ARMY DEPOT
CHAMBERSBURG                     PA

PA-213820503 PROJECT: LK-SW-21                        150.0  ESDF
INSTALL RUNON/RUNOFF CONTROLS FOR OB GRNDS
ACCT: INDUSTRIAL FUND
LETTERKENNY ARMY DEPOT
CHAMBERSBURG                     PA
                           90/09  HIGH    SOLID
                                         WASTE
                           90/09  HIGH    SOLID
                                         WASTE
    1,000.0   ESDF    92/09   90/10 MEDIUM   SOLID
                                         WASTE
                           90/09 MEDIUM   SOLID
                                         WASTE
                        ADEQUATE  ADEQUATE
                         DESIGN    TIMING
                        ADEQUATE  ADEQUATE
                         DESIGN    TIMING
                        ADEQUATE  ADEQUATE
                         DESIGN    TIMING
                       ADEQUATE  ADEQUATE
                        DESIGN    TIMING
ADEQUATE
ESTIMATE
ADEQUATE
ESTIMATE
ADEQUATE
ESTIMATE
ADEQUATE
ESTIMATE

-------
                                  FEDERAL  AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                          DEPARTMENT  OF  ARMY                      ARMY MATERIAL COMMAND
                 PROJECT IDENTIFICATION
                     REQ    EST   PROJECT
  BUDGET     COMPL    COMPL  COMPL ASSESS- MEDIA
(THOUSANDS)   STATUS   DATE   DATE  MENT    TYPE
                                                                     ARMY-1
                            ADEQUACY  OF  PROJECT
                          ENGIN-
                          EERING    TIME     COST
 PA-213820503 PROJECT:  LK-SW-1
 BEST MANAGEMENT  PRACTICES  STUDY/PLAN
 ACCT:  INDUSTRIAL FUND
 LETTERKENNY  ARMY DEPOT
 CHAMBERS3URG                    PA

 PA-213S20503 PROJECT: LK0089S021
 HAZMIN  -  INDUSTRIAL WASTE  SLUDGE DRYER
 ACCT: DERA -  DMA (OPERATIONS AND MA
 LETTERKENNY  ARMY DEPOT
 CHAMBERSBURG                     PA

 PA-213820503  PROJECT: LK0089S024
 HAZMIN-SPENT  BLAST RESIDUE/PAINT CHIP SEP
 ACCT: DERA -  OPA  (OTHER PROCUREMENT
 LETTERKENNY ARMY DEPOT
 CHAMBERSBURG                     PA

 PA-213820503  PROJECT: LK0089S025
HAZMIN-UPGRADE CHROME PLATING LINE
ACCT: DERA - DMA (OPERATIONS AND MA
 LETTERKENNY ARMY DEPOT
CHAMBERSBURS                     PA
                                                       60.0  PSDF
      100.0   ESDL
      150.0   ESDL
      300.0   ESDL
                          90/09 MEDIUM   SOLID
                                         WASTE
                          90/09  HIGH    SOLID
                                         WASTE
90/12  HIGH    SOLID
               WASTE
91/01  HIGH    SOLID
               WASTE
                        ADEQUATE  ADEQUATE    ADEQUATE
                         DESIGN    TIMING    ESTIMATE
                        ADEQUATE  ADEQUATE    ADEQUATE
                         DESIGN    TIMING    ESTIMATE
                                                  ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
                                                  ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
PA-213820503 PROJECT: LK0089S026
CONSTRUCTION DEBRIS LANDFILL
ACCT: INDUSTRIAL FUND
LETTERKENNY ARMY DEPOT
CHAMBERSBURG                     PA

PA-213820503 PROJECT: LK-W-7
CONNECT BOILER ROOM DRAINS TO I.W.T.P. LINE
ACCT: INDUSTRIAL FUND
LETTERKENNY ARMY DEPOT
CHAMBERSBURG                     PA
      175.0  ESDL
    1,000.0  ESDP
91/10 MEDIUM   SOLID
               WASTE
90/09  HIGH    WATER
                                                  ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
                                                  ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE

-------
                                 FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR  1991

                         DEPARTMENT OF ARMY                      ARMY MATERIAL COMMAND
                PROJECT IDENTIFICATION
                     REQ    EST   PROJECT
  BUDGET     COMPL   COMPL  COMPL ASSESS-  MEDIA
(THOUSANDS)   STATUS  DATE    DATE   MENT     TYPE
                                                                                                                     ARMY-135
                            ADEQUACY OF PROJECT
                          ENGIN-
                          EERING    TIME      COST
PA-213820503 PROJECT: A098M
REVISE SPCC & ISCP PLANS
ACCT: OMA OPERATIONS & MAINT.ARMY
LETTERKENNY ARMY DEPOT
CHAMBERSBURG                     PA

PA-213820503 PROJECT: A098G
CONSTRUCT PADS/DIKES FOR FUEL STORAGE AREAS
ACCT: INDUSTRIAL FUND
LETTERKENNY ARMY DEPOT
CHAMBERSBURG                     PA

PA-213820503 PROJECT: LK0089S023
STORM SEWER SYSTEM STUDY
ACCT: INDUSTRIAL FUND
LETTERKENNY ARMY DEPOT
CHAMBERSBURG                     PA

PA-213820503 PROJECT: LK0089S027
REPLACE PUMPS IN SEWAGE PUMP STATIONS
ACCT: INDUSTRIAL FUND
LETTERKENNY ARMY DEPOT
CHAMBERSBURG                     PA

PA-213820642 PROJECT: NC-A-25
ASBESTOS REMOVAL
ACCT: OMA OPERATIONS & MAINT.ARMY
NEW CUMBERLAND ARMY DEPOT
HARRISBURG                       PA

PA-213820642 PROJECT: NC-A-26
RADON SURVEYS
ACCT: INDUSTRIAL FUND
NEW CUMBERLAND ARMY DEPOT
HARRISBURG                       PA
       40.0  ESDP
       60.0  ESDP
                           90/09   HIGH    WATER    ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
90/09  HIGH    WATER    ADEQUATE  ADEQUATE    ADEQUATE
                         DESIGN    TIMING    ESTIMATE
       75.0  ESDF   91/01   90/09  MEDIUM   WATER    ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
      120.0  ESRO
        5.0  ESDF
       56.0  ESDL
                           90/10  HIGH    WATER    ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
                           90/09 MEDIUM    AIR     ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
                           90/09 MEDIUM RADIATION  ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE

-------
                                  FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                          DEPARTMENT OF ARMY                     ARMY MATERIAL COMMAND
                 PROJECT IDENTIFICATION
                     REQ    EST   PROJECT
  BUDGET     COMPL    COMPL   COMPL ASSESS- MEDIA
(THOUSANDS)   STATUS   DATE    DATE  MENT    TYPE
                                                                     ARMY-136
                            ADEQUACY OF PROJECT
                          ENGIN-
                          EERING    TIME      COST
 PA-213820642 PROJECT:  NC-A-27
 RADON ABATEMENT PROJECTS
 ACCT: OMA OPERATIONS & MAINT.ARMY
 NEW CUMBERLAND ARMY DEPOT
 HARRISBURG                      PA

 PA-213S20642 PROJECT:  NC-SF-32
 EVALUATE  DEPOT LANDFILLS/SOIL CONTAM CLEANUP
 ACCT:  DERA - OMA  (OPERATIONS  AND MA
 NEW CUMBERLAND ARMY DEPOT
 HARRISBURG                      PA

 PA-213820642 PROJECT:  NC-SW-23
 HAZARDOUS  WASTE DISPOSAL
 ACCT:  INDUSTRIAL  FUND
 NEW CUMBERLAND ARMY  DEPOT
 HARRISBURG                       PA

 PA-213820642  PROJECT:  NC-W-30
 TREAT  CONTAM GW FROM UNDERGROUND TANK 950-PHASE
 ACCT:  INDUSTRIAL  FUND
 NEW CUMBERLAND ARMY DEPOT
 HARRISBURG                       PA

 PA-213820642  PROJECT:  NC-W-7
 CLOSURE AND REMOVAL OF REGULATED TANKS
 ACCT: DERA -  OMA  (OPERATIONS AND MA
 NEW CUMBERLAND ARMY DEPOT
HARRISBURG                       PA

 PA-213820642  PROJECT:  NC0089S002
 SLUDGE REMOVAL AND STP REPAIRS
ACCT: INDUSTRIAL  FUND
NEW CUMBERLAND ARMY DEPOT
HARRISBURG                       PA
       94.0   ESDL
      201.0   OTHR
      160.0  CMPA
    1,100.0  ESDP
      80.0  ESDF
      60.0  ESDF
                           90/09  HIGH  RADIATION  ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
                           90/09  HIGH    CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
                          90/09  HIGH
90/09  HIGH
                                         SOLID
                                         WASTE
                                         SOLID
                                         WASTE
90/09 MEDIUM   SOLID
               WASTE
                          90/09 MEDIUM   WATER
                        ADEQUATE  ADEQUATE    ADEQUATE
                         DESIGN    TIMING    ESTIMATE
                        ADEQUATE  ADEQUATE    ADEQUATE
                         DESIGN    TIMING    ESTIMATE
                                                  ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
                                                  ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE

-------
                                 FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                         DEPARTMENT OF ARMY                      ARMY MATERIAL COMMAND
                PROJECT IDENTIFICATION
                                    REQ    EST   PROJECT
                 BUDGET     COMPL   COMPL  COMPL ASSESS- MEDIA
               (THOUSANDS)  STATUS  DATE   DATE  MENT    TYPE
                                                                                    ARMY-137
                            ADEQUACY OF  PROJECT
                          ENGIN-
                          EERING    TIME      COST
PA-213820892 PROJECT: TY-A-26
RADON ABATEMENT PROJECTS
ACCT: AFH (NEW CONSTRUCTION)
TOBYHANNA ARMY DEPOT
TOBYHANNA
PA
PA-213820892 PROJECT: TY-R-28
RADON SRVEY/HW DISPOSAL/BOILER EMISSIONS INVENT
ACCT: INDUSTRIAL FUND
TCBYHANNA ARMY DEPOT
TOBYHANNA                        PA

PA-213820892 PROJECT: TY0089S004
RADON SURVEY AND PM10 EMISSIONS INVENTORY
ACCT: INDUSTRIAL FUND
TOBYHANNA ARMY DEPOT
TOBYHANNA                        PA

PA-213820892 PROJECT: TY-SW-6
HAZARDOUS WASTE DISPOSAL
ACCT: INDUSTRIAL FUND
TOBYHANNA ARMY DEPOT
TOBYHANNA                        PA
PA-213820892 PROJECT: TY0089S003
UST RESTORATION
ACCT: INDUSTRIAL FUND
TOBYHANNA ARMY DEPOT
TOBYHANNA
PA
PA-213820892 PROJECT: TY-W-18
COAL PILE RUNOFF RETENTION POND
ACCT: MILCON,ARMY (MCA)
TOBYHANNA ARMY DEPOT
TOBYHANNA                        PA
                     3*3.0  ESDF
                      35.0  ESDF
                      35.0  ESDF
                     402.0  CMPA
                                                      225.0  ESDP
                                                      488.0  ESDP
                                          90/09 MEDIUM RADIATION  ADEQUATE  ADEQUATE   ADEQUATE
                                                                   DESIGN    TIMING    ESTIMATE
90/09 MEDIUM RADIATION  ADEQUATE   ADEQUATE   ADEQUATE
                         DESIGN    TIMING    ESTIMATE
                                          90/09 MEDIUM RADIATION   ADEQUATE  ADEQUATE   ADEQUATE
                                                                  DESIGN    TIMING    ESTIMATE
                                          90/09  HIGH     SOLID    ADEQUATE  ADEQUATE   ADEQUATE
                                                         WASTE     DESIGN    TIMING    ESTIMATE
                                          90/09  HIGH     SOLID    ADEQUATE  ADEQUATE   ADEQUATE
                                                         WASTE     DESIGN    TIMING    ESTIMATE
                                          90/09  HIGH    WATER    ADEQUATE  ADEQUATE   ADEQUATE
                                                                  DESIGN    TIMING    ESTIMATE

-------
                                  FEDERAL  AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                          DEPARTMENT OF  ARMY                      ARMY MATERIAL COMMAND
                 PROJECT IDENTIFICATION
                     REQ     EST   PROJECT
  BUDGET     COMPL    COMPL   COMPL ASSESS- MEDIA
(THOUSANDS)   STATUS   DATE    DATE  MENT    TYPE
                                                                                                                     ARMY-138
                            ADEQUACY  OF  PROJECT
                          ENGIN-
                          EERING    TIME     COST
 PA-213820892 PROJECT:  TY-W-21
 ELIMINATE  STM/SAM SEWER  GROSS  CONECTION
 ACCT:  INDUSTRIAL  FUND
 TOBYHANNA  ARMY DEPOT
 TOBYHANNA                         PA

 PA-213821510 PROJECT:  SR0089S003
 REHAB  TANK FARMS
 ACCT:  PAA(PEMA)
 SCRANTON ARMY  AMMO  PLT
 SCRANTON                          PA

 PA-213822812 PROJECT: HY-A-1
 ASBESTOS INSULATION  REMOVAL
 ACCT:  DMA  OPERATIONS & MAINT,ARMY
 HAYS ARMY  AMMO PLT
 PITTSBURGH                        PA

 PA-213822812 PROJECT: HY-TS-2
REMOVE AND DISPOSE OF PCB TRANSFORMER OILS
ACCT: OMA OPERATIONS & MAINT,ARMY
HAYS ARMY AMMO PLT
 PITTSBURGH                        PA

PA-213839600 PROJECT: DES089S001
HAZMIN-COMMAND PROGRAM TO REDUCE HW SEN
ACCT: DERA - OMA (OPERATIONS AND MA
HQ DEPOT SYSTEMS COMMAND
CHAMBERSBURG                      PA

TN-213820421 PROJECT: HO-SW-17
RELOCATE PILE 1 AND  CAGE 1 AT BURMIN6 GRD.
ACCT: PAA(PEMA)
HOLSTON ARMY AMMO PLT
KINGSPORT                        TN
                                                      200.0  ESRE
      519.0   ESDP
      674.0   ESDF
                          90/09 MEDIUM   WATER    ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
                           90/09  HIGH    SOLID    ADEQUATE  ADEQUATE   ADEQUATE
                                         WASTE     DESIGN    TIMING    ESTIMATE
                          90/09 MEDIUM    AIR     ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
      153.0   ESDF   90/10  90/09 MEDIUM   TOXIC    ADEQUATE  ADEQUATE   ADEQUATE
                                       SUBSTANCE   DESIGN    TIMING    ESTIMATE
    7,500.0  OTHR
      54.0  ESDF
90/09 MEDIUM   SOLID
               WASTE
                          90/09 MEDIUM   SOLID
                                         WASTE
                                                  ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
                        ADEQUATE   ADEQUATE    ADEQUATE
                         DESIGN     TIMING     ESTIMATE

-------
                                 FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR  1991

                         DEPARTMENT OF ARMY                      ARMY MATERIAL COMMAND
                PROJECT IDENTIFICATION
                     REQ    EST   PROJECT
  BUDGET     COMPL   COMPL  COMPL ASSESS- MEDIA
(THOUSANDS)   STATUS  DATE    DATE   MENT    TYPE
                                                                                                                     ARMY-139
                            ADEQUACY OF PROJECT
                          ENGIN-
                          EERING    TIME      COST
TN-213820582 PROJECT: A171E
INSTALLATION RESTORATION RI/FS & RA
ACCT: DERA - DMA (OPERATIONS AND MA
MILAN ARMY AMMO PLT
MILAN                            TN

TN-213820582 PROJECT: MI-SF-5
RI/FS/RA FOR CLEANUP OF BURNINGGRA
ACCT: DERA - DMA (OPERATIONS AND MA
MILAN ARMY AMMO PLT
MILAN                            TN

TN-213820582 PROJECT: MI-M-9
MONITORING EQUIPMENT
ACCT: PAA(PEMA)
MILAN ARMY AMMO PLT
MILAN                            TN

TN-213820933 PROJECT: V00089S002
RADON TESTING
ACCT: DMA OPERATIONS 4 MAINT.ARMY
VOLUNTEER ARMY AMMO PLT
CHATTANOOGA                      TN

TN-213820933 PROJECT: A-P-85A
PESTICIDE STORAGE AND MIXING OPNS
ACCT: PAA(PEMA)
VOLUNTEER ARMY AMMO PLT
CHATTANOOGA                      TN

TN-213820933 PROJECT: VO-SF-1
INSTALLATION RESTORATION RI/SF & RA
ACCT: DERA - DMA (OPERATIONS AND MA
VOLUNTEER ARMY AMMO PLT
CHATTANOOGA                      TN
      500.0  ESDF
    2,075.0  ESDF
      208.0  OTHR
       60.0  ESDL
      218.0  ESDP
    2,100.0  PSDF
                           90/09   HIGH    CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
90/12  HIGH    CERCLA   ADEQUATE  ADEQUATE    ADEQUATE
                         DESIGN    TIMING     ESTIMATE
                           90/09   LOW     WATER    ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
                           90/09   LOW
                                          AIR     ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
                           90/09  HIGH  PESTICIDES ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
90/09 MEDIUM   CERCLA    ADEQUATE  ADEQUATE   ADEQUATE
                         DESIGN    TIMING    ESTIMATE

-------
                                  FEDERAL AGENCY POLLUTION  ABATEMENT  PLAN FOR FISCAL YEAR 1991

                          DEPARTMENT OF ARMY                     ARMY MATERIAL COMMAND
                 PROJECT IDENTIFICATION
                     REQ    EST    PROJECT
  BUDGET     COMPL   COMPL  COMPL  ASSESS- MEDIA
(THOUSANDS)   STATUS  DATE    DATE   MENT    TYPE
                                                                     ARMY-140
                            ADEQUACY OF  PROJECT
                          ENGIN-
                          EERING    TIME      COST
 TX-213820529 PROJECT:  LH-SW-35
 CONSTRUCT 8 CATCH PADS FOR  DIESEL  LOADING
 ACCT:  PAA(PEMA)
 LONSHORN ARMY AMMO PLT
 MARSHALL                        TX

 TX-213820529 PROJECT:  LH-SW-22
 CONSTRUCT SOLVENT STORAGE PADS WITH COVERS
 ACCT:  PAA(PEMA)
 LONGHORN ARMY AMMO PLT
 MARSHALL                        TX

 TX-213820529  PROJECT:  LH-SW-13
 DEMOLITION  OF  TNT INCINERATOR  AREA
 ACCT:  PAA(PEMA)
 LONGHORN  ARMY  AMMO  PLT
 MARSHALL                         TX

 TX-213820529 PROJECT:  LH-W-19
 BLDG.  34-Y  WASHDOWN COLLECTION SYSTME
 ACCT:  PAA(PEMA)
 LONGHORN ARMY AMMO PLT
 MARSHALL                         TX

 TX-213820738 PROJECT:  RR-A-37
 ASBESTOS ABATEMENT PROJECT
 ACCT: DMA OPERATIONS i. MAINT.ARMY
RED RIVER ARMY DEPOT
 TEXARKANA                        TX

TX-213820738 PROJECT: RR-A-38
RADON SURVEYS
ACCT: INDUSTRIAL  FUND
RED RIVER ARMY DEPOT
TEXARKANA                        TX
                                                       40.0  ESDF
      140.0   ESDF
      250.0   ESDL
                           90/09  MEDIUM   SOLID    ADEQUATE  ADEQUATE   ADEQUATE
                                         WASTE     DESIGN    TIMING    ESTIMATE
                           90/09 MEDIUM   SOLID
                                         WASTE
                          90/09   LOW     SOLID
                                         WASTE
                        ADEQUATE  ADEQUATE    ADEQUATE
                         DESIGN    TIMING    ESTIMATE
                        ADEQUATE   ADEQUATE    ADEQUATE
                         DESIGN    TIMING    ESTIMATE
       20.0   ESDF   77/03  90/09 MEDIUM   WATER    ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
       6.0  OTHR
90/09 MEDIUM    AIR
                                                    NOT
                                                   AVAIL
                                    NOT
                                   AVAIL
 NOT
AVAIL
      52.0  OTHR   90/06  90/09  LOW   RADIATION  ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE

-------
                                 FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                         DEPARTMENT OF ARMY                      ARMY MATERIAL COMMAND
                PROJECT IDENTIFICATION
                                                                     REQ    EST   PROJECT
                                                  BUDGET     COMPL   COMPL  COMPL ASSESS- MEDIA
                                                (THOUSANDS)  STATUS  DATE   DATE  MENT    TYPE
                                                                                                                      ARMY-141
                                                 ADEQUACY OF  PROJECT
                                               ENGIN-
                                               EERING    TIME      COST
TX-213820738 PROJECT: RR-A-39
RADON ABATEMENT PROJECTS
ACCTi INDUSTRIAL FUND
RED RIVER ARMY DEPOT
TEXARKANA                        TX

TX-21362073a PROJECT: RR-SW-34
CLOSURE OF SLUDGE DRYING BEDS
ACCT: MILCON, ARMY RSV(MCAR)
RED RIVER ARMY DEPOT
TEXARKANA                        TX

TX-213820738 PROJECT: RR-SW-40
RFI CORRECTIVE ACTION
ACCT: INDUSTRIAL FUND
RED RIVER ARMY DEPOT
TEXARKANA                        TX

TX-213820738 PROJECT: RR-SW-5
HAZARDOUS WASTE DISPOSAL
ACCT: INDUSTRIAL FUND
RED RIVER ARMY DEPOT
TEXARKANA                        TX

TX-213820738 PROJECT: RR-SW-25
ANALYTICAL SUPPORT GROUNDWATER MONITORING
ACCT: INDUSTRIAL FUND
RED RIVER ARMY DEPOT
TEXARKANA                        TX
                                                      149.0  OTHR   93/07  90/09  LOW   RADIATION  ADEQUATE   ADEQUATE    ADEQUATE
                                                                                                    DESIGN    TIMING    ESTIMATE
                                                      350.0  CMPA   92/01  91/01  HIGH    SOLID    ADEQUATE   ADEQUATE    ADEQUATE
                                                                                          WASTE     DESIGN    TIMING     ESTIMATE
                                                    5,000.0  CMPA   91/12  90/09  HIGH    SOLID    ADEQUATE   ADEQUATE   ADEQUATE
                                                                                          WASTE     DESIGN    TIMING    ESTIMATE
                                                      729.0  CMPA
                                                       30.0  ESDP
                     90/09  HIGH     SOLID    ADEQUATE  ADEQUATE   ADEQUATE
                                    WASTE     DESIGN    TIMING    ESTIMATE
                                                                           90/09  HIGH
TX-213820738 PROJECT:
REINJECT TREATED GW 3
ACCT: INDUSTRIAL FUND
RED RIVER ARMY DEPOT
TEXARKANA
                      RR0089S002
                      CEL & OBOD
100.0  OTHR   96/12   90/12   LOW
                                                                                          SOLID     ADEQUATE  ADEQUATE   ADEQUATE
                                                                                          WASTE      DESIGN    TIMING    ESTIMATE
                                    SOLID    ADEQUATE  ADEQUATE   ADEQUATE
                                    WASTE     DESIGN    TIMING    ESTIMATE
                                 TX

-------
                                  FEDERAL  AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                          DEPARTMENT OF ARMY                      ARMY MATERIAL COMMAND
                 PROJECT IDENTIFICATION
                     REQ    EST   PROJECT
  BUDGET     COMPL    COMPL  COMPL ASSESS- MEDIA
(THOUSANDS)   STATUS   DATE   DATE  MENT    TYPE
                                                                                                                     ARMY-142
  ADEQUACY OF PROJECT
ENGIN-
EERING    TIME      COST
 TX-213820738 PROJECT:  RR0089S003                      100.0  OTHR
 GW MONITORING AND  WATER  TREATMENT  PLANT UPGRADE
 ACCT:  INDUSTRIAL FUND
 RED RIVER  ARMY DEPOT
 TEXARKANA                        TX

 TX-213820738 PROJECT:  RR0089S004
 VOC CONTROL  AND GW MONITORING SPT
 ACCT:  INDUSTRIAL FUND
 RED  RIVER  ARMY DEPOT
 TEXARKANA                        TX

 TX-213821831  PROJECT:  LS-SW-2<+                        150.0  ESDP
 DEMOLITION OF  STRUCTURES
 ACCT: DERA -  OMA (OPERATIONS AND MA
 LONE STAR ARMY  AMMO PLT
 TEXARKANA                        TX

 TX-213821S31  PROJECT:  LS-SF-38                        140.0  ESDF
 INSTALLATION RESTORATION RI/FS & RA
 ACCT: DERA - OMA (OPERATIONS AND MA
 LONE STAR ARMY AMMO PLT
TEXARKANA                        TX

TX-213821831 PROJECT:  LS-SF-18                        111.0  ESRO
GROUNDWATER MONITORING EQUIPMENT
ACCT: PAA(PEMA)
 LONE STAR ARMY AMMO PLT
TEXARKANA                        TX

TX-213821831 PROJECT:  LS-SW-35                         29.0  ESDP
ENVIRONMENTAL DATA MANAGEMENT SYSTEM
ACCT: OMA OPERATIONS & MAINT.ARMY
 LONE STAR ARMY AMMO PLT
TEXARKANA                        TX
                          90/09  LOW     SOLID    ADEQUATE  ADEQUATE   ADEQUATE
                                         WASTE     DESIGN    TIMING    ESTIMATE
       30.0   ESDF    96/12  90/09 MEDIUM   WATER
                          90/09  LOW     CERCLA
                          90/09  HIGH    CERCLA
                                                  ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
                                                  ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
                                                  ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
                          90/09  LOW     CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
                          90/09  HIGH    SOLID    ADEQUATE  ADEQUATE   ADEQUATE
                                         WASTE     DESIGN    TIMING    ESTIMATE

-------
                                 FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                         DEPARTMENT OF ARMY                      ARMY MATERIAL COMMAND
                PROJECT IDENTIFICATION
                     REQ    EST   PROJECT
  BUDGET     COMPL   COMPL  COMPL ASSESS- MEDIA
(THOUSANDS)   STATUS  DATE   DATE   MENT     TYPE
                                                                                                                      ARMY-143
    ADEQUACY OF PROJECT
  ENGIN-
  EERING    TIME      COST
TX-213821831 PROJECT: LS-SW-40
DEMIL EQUIPMENT FOR INERT METAL PARTS
ACCT: PAA(PEMA)
LONE STAR ARMY AMMO PLT
TEXARKANA                        TX
      178.0  ESDF   88/1Z  90/09 MEDIUM    SOLID
                                          WASTE
ADEQUATE  ADEQUATE   ADEQUATE
 DESIGN    TIMING    ESTIMATE
TX-213821831 PROJECT: LS-SW-41
FENCING FOR HAZARDOUS WASTE FACILITIES
ACCT: PAA(PEMA)
LONE STAR ARMY AMMO PLT
TEXARKANA                        TX

TX-213821831 PROJECT: LS-SW-3
CONSTRUCTION OF BURN PADS
ACCT: DMA OPERATIONS ft MAINT.ARMY
LONE STAR ARMY AMMO PLT
TEXARKANA                        TX

TX-213621831 PROJECT: LS-SW-42
LABORATORY ANALYTICAL EQUIPMENT GC-MS
ACCT: PAA(PEMA)
LONE STAR ARMY AMMO PLT
TEXARKANA                        TX

TX-213621831 PROJECT: LS-W-29
COOLINS/CONDENSATE LINES REROUTE STUDY
ACCT: PAA(PEMA)
LONE STAR ARMY AMMO PLT
TEXARKANA                        TX

TX-213Q21831 PROJECT: A181AJ
CAN WASH FACILITY P-47
ACCT: PAA(PEMA)
LONE STAR ARMY AMMO PLT
TEXARKANA                        TX
      216.0  ESDF   88/12  90/09 MEDIUM    SOLID
                                          WASTE
      246.0  ESDF
      203.0  OTHR
                           90/09  MEDIUM    SOLID
                                          WASTE
                           90/09   LOW
       65.0  ESDP   77/03  90/09  HIGH
                                          SOLID
                                          WASTE
                                         WATER
       86.0  ESDP   77/03   90/09  HIGH    WATER
ADEQUATE  ADEQUATE
 DESIGN    TIMING
ADEQUATE  ADEQUATE
 DESIGN    TIMING
ADEQUATE  ADEQUATE
 DESIGN    TIMING
                                                  ADEQUATE  ADEQUATE
                                                   DESIGN    TIMING
                                                  ADEQUATE  ADEQUATE
                                                   DESIGN    TIMING
ADEQUATE
ESTIMATE
ADEQUATE
ESTIMATE
ADEQUATE
ESTIMATE
                     ADEQUATE
                     ESTIMATE
                     ADEQUATE
                     ESTIMATE

-------
                                  FEDERAL AGENCY POLLUTION  ABATEMENT  PLAN FOR FISCAL YEAR 1991

                          DEPARTMENT OF ARMY                     ARMY MATERIAL COMMAND
                 PROJECT IDENTIFICATION
                     REQ    EST    PROJECT
  BUDGET     COMPL    COMPL   COMPL  ASSESS- MEDIA
(THOUSANDS)   STATUS   DATE    DATE   MENT    TYPE
                                                                     ARMY-K4
                            ADEQUACY OF PROJECT
                          ENGIN-
                          EERING    TIME      COST
 TX-213S21831 PROJECT:  LS-W-34
 CONST TRANSFER FOR AREA F  WASTEWATER.
 ACCT: PAA(PEMA)
 LONE STAR ARMY AMMO PLT
 TEXARKANA                        TX

 TX-213821831 PROJECT:  LS-W-9
 SEWER SYSTEM CAPACITY  STUDY
 ACCT: DMA OPERATIONS 8 MAINT,ARMY
 LONE STAR ARMY AMMO PLT
 TEXARKANA                        TX

 TX-213821831  PROJECT:  LS-W-53
 SPILL MONITORING SYSTEM
 ACCT:  DERA  -  OMA (OPERATIONS AND  MA
 LONE  STAR ARMY AMMO PLT
 TEXARKANA                         TX

 TX-213848186  PROJECT:  CCAD89S002
 RADON SURVEYS
 ACCT:  INDUSTRIAL FUND
 CORPUS CHRISTI ARMY DEPOT
 CORPUS CHRISTI                    TX

 TX-213848186 PROJECT: CC-A-11
 ASBESTOS ABATEMENT HAZARD MANAGEMENT AT CCA
 ACCT: INDUSTRIAL FUND
 CORPUS CHRISTI ARMY DEPOT
CORPUS CHRISTI                   TX

TX-213848186 PROJECT: CC-A-25
RADON ABATEMENT PROJECTS
ACCT: OMA OPERATIONS & MAINT.ARMY
CORPUS CHRISTI ARMY DEPOT
CORPUS CHRISTI                   TX
       64.0   PSDF    77/03   90/09 MEDIUM   WATER
       72.0   ESRO    77/03  90/09   LOW     WATER
                                                  ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
                                                  ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
      310.0   ESDL   77/03  90/09  LOW     WATER    ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
       21.0  ESDF   90/06  90/09 MEDIUM    AIR     ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
     250.0  OTHR
      81.0  OTHR
90/09  HIGH     AIR     ADEQUATE   ADEQUATE    ADEQUATE
                         DESIGN    TIMING    ESTIMATE
                          90/09  LOW      AIR     ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE

-------
                                 FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                         DEPARTMENT OF ARMY                      ARMY MATERIAL COMMAND
                PROJECT IDENTIFICATION
                     REQ    EST   PROJECT
  BUDGET     COMPL   COMPL  COMPL ASSESS-  MEDIA
(THOUSANDS)  STATUS  DATE   DATE  MENT    TYPE
                                                                     ARMY-1
                            ADEQUACY OF  PROJECT
                          ENGIN-
                          EERING    TIME      COST
TX-213848186 PROJECT: CCAD89S009
HAZMIN-OFF-SITE RECYCLING OF METAL PLAT SHOP
ACCT: INDUSTRIAL FUND
CORPUS CHRISTI ARMY DEPOT
CORPUS CHRISTI                   TX

TX-213848186 PROJECT: CC-SW-35
HAZARDOUS WASTE DISPOSAL
ACCT: INDUSTRIAL FUND
CORPUS CHRISTI ARMY DEPOT
CORPUS CHRISTI                   TX

UT-213820283 PROJECT: DU0089S003
GREENSTRIPPING-FIREBREAK SOIL STABILIZATION
ACCT: RDT & E
DUGWAY PROVING GROUND
DUGWAY                           UT

UT-213820283 PROJECT: DU-SW-28
ASBESTOS REMOVAL/ABATEMENT
ACCT: RDT & E
DUGWAY PROVING GROUND
DUGWAY                           UT

UT-213820283 PROJECT: DU0089S007
ARCHAEOLOGICAL/HISTORICAL SURVEY
ACCT: RDT * E
DUGWAY PROVING GROUND
DUGWAY                           UT

UT-213820283 PROJECT: DU0089S009
ECOLOGICAL SURVEILLANCE
ACCT: RDT & E
DUGWAY PROVING GROUND
DUGWAY                           UT
      400.0  ESDL
      935.0  OTHR
       40.0  ESDF
      250.0  ESDF
      100.0   ESDP
      100.0   ESDP
90/09  LOW     SOLID
               WASTE
                           90/09  LOW      SOLID
                                          WASTE
90/09 MEDIUM    AIR
90/09 MEDIUM    AIR
90/09  HIGH   MULTI
              MEDIA
90/09  HIGH   MULTI
              MEDIA
                                                  ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
                        ADEQUATE  ADEQUATE
                         DESIGN    TIMING
                                                    NOT
                                                   AVAIL
                                    NOT
                                   AVAIL
                                                  ADEQUATE  ADEQUATE
                                                   DESIGN    TIMING
                                                    NOT
                                                   AVAIL
                                                    NOT
                                                   AVAIL
 NOT
AVAIL
 NOT
AVAIL
          ADEQUATE
          ESTIMATE
            NOT
           AVAIL
                                            ADEQUATE
                                            ESTIMATE
 NOT
AVAIL
 NOT
AVAIL

-------
                                  FEDERAL  AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR  1991

                          DEPARTMENT OF  ARMY                      ARMY MATERIAL COMMAND
                 PROJECT IDENTIFICATION
                    RE<5    EST   PROJECT
  BUDGET     COMPL   COMPL  COMPL ASSESS- MEDIA
(THOUSANDS)   STATUS  DATE   DATE  MENT    TYPE
                                                                                                                     ARMY-146
  ADEQUACY OF PROJECT
ENGIN-
EERING    TIME      COST
 UT-213820283 PROJECT:  DU0089S030
 NATURAL RESOURCES PROGRAM
 ACCT:  RDT & E
 DUGWAY PROVING GROUND
 DUGWAY                          UT

 UT-21382C283 PROJECT:  DU0089S010
 GEOGRAPHIC  INFORMATION SYSTEM  (GIS)
 ACCT:  OMA OPERATIONS & MAINT.ARMY
 DUGWAY PROVING GROUND
 DUGWAY                          UT

 UT-213820283 PROJECT:  DU0089S011
 URBAN  FORESTRY
 ACCT:  OMA OPERATIONS t MAINT,ARMY
 DUGWAY  PROVING  GROUND
 DUGWAY                           UT

 UT-213820283  PROJECT: DU0089S012
 BASELINE WILDLIFE  HABITAT INVENTORY 4 CENSUS
 ACCT: OMA OPERATIONS 4 MAINT.ARMY
 DUGWAY  PROVING GROUND
 DUGWAY                           UT

 UT-213820283  PROJECT: DU0089S013
 FERRUGINOUS HAWK & BURROWING OWL CENSUS
 ACCT: OMA OPERATIONS & MAINT.ARMY
DUGWAY PROVING GROUND
DUGWAY                           UT

UT-213820283  PROJECT: DU0089S004
ENVIRONMENTAL SERVICES CONTRACT
ACCT: RDT & E
DUGWAY PROVING GROUND
DUGWAY                           UT
                                                      150.0  ESDF
       50.0   ESRE
       6.0   ESRE
       20.0  ESRE
       5.0  ESRE
     400.0  ESDL
                          90/09 MEDIUM  MULTI       NOT       NOT        NOT
                                        MEDIA      AVAIL     AVAIL      AVAIL
                          90/09  LOW    MULTI       NOT       NOT        NOT
                                        MEDIA      AVAIL     AVAIL      AVAIL
                          90/09 MEDIUM  MULTI       NOT       NOT        NOT
                                        MEDIA      AVAIL     AVAIL      AVAIL
                          90/09  LOW    MULTI       NOT       NOT        NOT
                                        MEDIA      AVAIL     AVAIL      AVAIL
                          90/09  LOW    MULTI       NOT       NOT        NOT
                                        MEDIA      AVAIL     AVAIL      AVAIL
                          90/09  LOW    MULTI       NOT       NOT        NOT
                                        MEDIA      AVAIL     AVAIL      AVAIL

-------
                                 FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR  FISCAL YEAR  1991

                         DEPARTMENT OF ARMY                      ARMY MATERIAL COMMAND
                PROJECT IDENTIFICATION
                     REQ    EST    PROJECT
  BUDGET     COMPL   COMPL   COMPL  ASSESS- MEDIA
(THOUSANDS)   STATUS  DATE   DATE   MENT    TYPE
                                                                                                                     ARMY-147
                            ADEQUACY  OF  PROJECT
                          ENGIN-
                          EERING   TIME      COST
UT-213820283 PROJECT: DU0089S005
ENVIRONMENTAL PERMITS ft AGREEMENTS
ACCT: RDT * E
DUGWAY PROVING GROUND
DUGWAY                           UT

UT-2:3820283 PROJECT: DU-A-27
RADON MONITORING/ABATEMENT PROGRAM
ACCT: AFH (NEW CONSTRUCTION)
DUGWAY PROVING GROUND
DUGWAY                           UT

UT-213820283 PROJECT: DU-SW-14
INSTALLATION RESTORATION PROGRAM
ACCT: DERA - OMA (OPERATIONS AND MA
DUGWAY PROVING GROUND
DUGWAY                           UT

UT-213820283 PROJECT: DU-SW-21
RCRA PART B PERMIT APPLICATION
ACCT: RDT & E
DUGWAY PROVING GROUND
DUGWAY                           UT

UT-213820283 PROJECT: DU-SW-17
REPLACEMENT UNDERGROUND FUEL TANKS
ACCT: RDT & E
DUGWAY PROVING GROUND
DUGWAY                           UT

UT-213820283 PROJECT: DU-SW-22
HAZARDOUS WASTE SAMPLING
ACCT: RDT & E
DUGWAY PROVING GROUND
DUGWAY                           UT
       10.0  ESDL
      150.0  ESDF
    1,250.0   ESDF
      200.0   CMPA
      6
-------
                                  FEDERAL  AGENCY  POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                          DEPARTMENT OF  ARMY                      ARMY MATERIAL COMMAND
                 PROJECT IDENTIFICATION
                     REQ    EST   PROJECT
  BUDGET     COMPL    COMPL  COMPL ASSESS- MEDIA
(THOUSANDS)   STATUS   DATE   DATE  MENT    TYPE
                                                                     ARMY-148
                            ADEQUACY  OF  PROJECT
                          ENGIN-
                          EERING    TIME     COST
 UT-213820283 PROJECT:  DU-SW-23
 DISPOSING OF HAZARDOUS WASTE
 ACCT:  ROT & E
 DUGWAY PROVING GROUND
 DUGWAY                          UT

 UT-213820283 PROJECT:  DU-W-29
 U/G FUEL  TANK MONITORING  PROGRAM
 ACCT:  RDT & E
 DUGWAY PROVING GROUND
 DUGWAY                          UT

 UT-213S20283 PROJECT:  DU0089S025
 OPERATION OF CENTRAL HW STORAGE FACILITY
 ACCT:  RDT & E
 DUGWAY  PROVING  GROUND
 DUGWAY                           UT

 UT-213820283 PROJECT:  DU0089S021
 HAZARDOUS  WASTE TRAINING
 ACCT: RDT  &  E
 DUGWAY  PROVING  GROUND
 DUGWAY                           UT

 UT-213820283 PROJECT: DU0089S022
 HAZMAT TRAINING
 ACCT: RDT  &  E
 DUGWAY  PROVING  GROUND
DUGWAY                           UT

UT-213820283 PROJECT: DU-SW-33
CONDUCT STATE AGREEMENT COMPLIANCE INSPECTION
ACCT: RDT  &  E
DUGWAY PROVING  GROUND
DUGWAY                           UT
                                                      600.0  ESDP
       50.0   ESDP
      100.0   ESDP
       27.0  ESDP
       5.0  ESDP
      50.0  ESDF
                          90/09  HIGH    SOLID      NOT       NOT        NOT
                                         WASTE     AVAIL     AVAIL      AVAIL
                          90/09  HIGH    SOLID      NOT       NOT        NOT
                                         WASTE     AVAIL     AVAIL      AVAIL
                          90/09  HIGH    SOLID      NOT       NOT        NOT
                                         WASTE     AVAIL     AVAIL      AVAIL
                          90/09  HIGH    SOLID      NOT       NOT        NOT
                                         WASTE     AVAIL     AVAIL      AVAIL
                          90/09  HIGH    SOLID      NOT       NOT        NOT
                                         WASTE     AVAIL     AVAIL      AVAIL
90/09 MEDIUM   SOLID       NOT       NOT        NOT
               WASTE      AVAIL     AVAIL      AVAIL

-------
                                 FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                         DEPARTMENT OF ARMY                      ARMY MATERIAL COMMAND
                PROJECT IDENTIFICATION
                     REQ    EST   PROJECT
  BUDGET     COMPL   COMPL  COMPL  ASSESS- MEDIA
(THOUSANDS)  STATUS  DATE   DATE   MENT    TYPE
                                                                     ARMY-149
                            ADEQUACY  OF  PROJECT
                          ENGIN-
                          EERING    TIME     COST
UT-213820283 PROJECT: DU-W-10
MONITORING WILLS:  AROUND SOLID WASTE LANDFILL
ACCT: DERA - OMA (OPERATIONS AND MA
DUGWAY PROVING GROUND
DUGWAY                           UT

UT-213820283 PROJECT: DU-SW-24
LINING OF SANITARY LANDFILL TRENCHES
ACCT: ROT & E
DUGWAY PROVING GROUND
DUGWAY                           UT

UT-213820283 PROJECT: DU0089S031
TEST RANGE SWEEP
ACCT: DERA - OMA (OPERATIONS AND MA
DUGWAY PROVING GROUND
DUGWAY                           UT

UT-213820283 PROJECT: DU0089S020
IMPLEMENT HAZMIN PROG INNOVATIONS
ACCT: RDT & E
DUGWAY PROVING GROUND
DUGWAY                           UT

UT-213820283 PROJECT: DU-W-30
GROUNDWATER MONITORING PROGRAM
ACCT: RDT & E
DUGWAY PROVING GROUND
DUGWAY                           UT

UT-213820283 PROJECT: DU0089S027
WATER/SEWAGE LAGOON SAMPLING
ACCT: RDT & E
DUGWAY PROVING GROUND
DUGWAY                           UT
      250.0  ESDF
       75.0   PSDF
    1,000.0   PSDF
       25.0  ESDL
       55.0  ESDP
        5.0   ESDL
                           90/09  MEDIUM   SOLID
                                         WASTE
                           90/09  MEDIUM   SOLID
                                         WASTE
90/09 MEDIUM   SOLID
               WASTE
                           90/09 MEDIUM   SOLID
                                         WASTE
                           90/09  HIGH    WATER
                           90/09 MEDIUM   WATER
                          NOT
                         AVAIL
                          NOT
                         AVAIL
                                                    NOT
                                                   AVAIL
                          NOT
                         AVAIL
                                                    NOT
                                                   AVAIL
                                                    NOT
                                                   AVAIL
 NOT
AVAIL
 NOT
AVAIL
 NOT
AVAIL
 NOT
AVAIL
                                   NOT
                                  AVAIL
                                   NOT
                                  AVAIL
 NOT
AVAIL
 NOT
AVAIL
 NOT
AVAIL
 NOT
AVAIL
            NOT
           AVAIL
            NOT
           AVAIL

-------
                                  FEDERAL AGENCY  POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                          DEPARTMENT OF ARMY                      ARMY MATERIAL COMMAND
                 PROJECT IDENTIFICATION
                    REQ    EST   PROJECT
  BUDGET     COMPL   COMPL  COMPL ASSESS- MEDIA
(THOUSANDS)   STATUS  DATE   DATE  MENT    TYPE
                                                                     ARMY-150
                            ADEQUACY  OF  PROJECT
                          ENGIN-
                          EERING    TIME      COST
 UT-21382089-+ PROJECT:  TN-A-35
 RADON ABATEMENT PROJECTS
 ACCT: OMA OPERATIONS & MAINT,ARMY
 TOOELE ARMY DEPOT
 TOOELE                          UT

 UT-213820894 PROJECT:  TN-A-33
 ASBESTOS ABATEMENT  PROJECT
 ACCT:  OMA OPERATIONS t MAINT.ARMY
 TOOELE ARMY DEPOT
 TOOELE                          UT

 UT-213820894 PROJECT:  TN-A-34
 RADON  SURVEYS
 ACCT:  INDUSTRIAL  FUND
 TOOELE  ARMY  DEPOT
 TOOELE                           UT

 UT-213820894  PROJECT:  TN-SF-28
 INSTALLATION  RESTORATION PROGRAM
 ACCT:  DERA  -  OMA  (OPERATIONS  AND MA
 TOOELE  ARMY  DEPOT
 TOOELE                           UT

 UT-213820894  PROJECT:  TN-5F-4
 GROUNDWATER  SAMPLING AND ANALYSIS
 ACCT:  INDUSTRIAL  FUND
 TOOELE ARMY DEPOT
 TOOELE                           UT

UT-213820894  PROJECT:  TN-SF-23
 INSTALLATION  RESTORATION RI/FS & RA
ACCT: DERA -  OMA  (OPERATIONS AND MA
TOOELE ARMY DEPOT
TOOELE                           UT
                                                       43.0  ESDF
      367.0   ESDF
       66.0   ESDF
    3,660.0  CMPA
      100.0  CMPA
                          90/09 MEDIUM    AIR     ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
                          90/09 MEDIUM    AIR     ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
                          90/09 MEDIUM    AIR     ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
                          90/09  HIGH
90/09  HIGH
                                         CERCLA
                                         CERCLA
                                                    NOT
                                                   AVAIL
                                                    NOT
                                                   AVAIL
                                    NOT
                                   AVAIL
                                    NOT
                                   AVAIL
   3,660.0  ESDF   89/04  90/09 MEDIUM   CERCLA     NOT       NOT
                                                   AVAIL     AVAIL
 NOT
AVAIL
 NOT
AVAIL
                                               NOT
                                             AVAIL

-------
                                 FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                         DEPARTMENT OF ARMY                      ARMY MATERIAL COMMAND
                PROJECT IDENTIFICATION
                     REQ    EST   PROJECT
  BUDGET     COMPL   COMPL  COMPL ASSESS-  MEDIA
(THOUSANDS)   STATUS  DATE    DATE   MENT     TYPE
                                                                                                                     ARMY-151
                            ADEQUACY OF  PROJECT
                          ENGIN-
                          EERING    TIME      COST
UT-213820894 PROJECT: TN-SW-27
GROUNDWATER TREATMENT - IWL
ACCT: DERA - DMA (OPERATIONS AND MA
TOOELE ARMY DEPOT
TOOELE                           UT

UT-213820894 PROJECT: TN-W-17
LEAK TESTING UNDERGROUND STORAGE TANKS
ACCT: INDUSTRIAL FUND
TOOELE ARMY DEPOT
TOOELE                           UT

UT-213820894 PROJECT: TN-SW-9
HAZARDOUS WASTE DISPOSAL
ACCT: INDUSTRIAL FUND
TOOELE ARMY DEPOT
TOOELE                           UT

UT-213820894 PROJECT: TN-W-26
INDUSTRIAL WASTEWATER TREATMENT OPERATION
ACCT: INDUSTRIAL FUND
TOOELE ARMY DEPOT
TOOELE                           UT

WI-213820054 PROJECT: BA-SF-34
INSTALLATION RESTORATION RI/FS & RA
ACCT: DERA - DMA (OPERATIONS AND MA
BADGER ARMY AMMO PLT
BARABOO                          WI

WI-213820054 PROJECT: R64589S002
GROUND/JATER SAMPLING AND ANALYSIS
ACCT: DERA - DMA (OPERATIONS AND MA
BADGER ARMY AMMO PLT
BARABOO                          WI
    1,000.0  CMPA
      400.0  ESDP
    1,755.0  ESDF
    1,180.0  ESDF
    1,200.0  ESDF
      690.0  CMPA
                           90/09   HIGH
                           90/09   HIGH
                                          SOLID
                                          WASTE
                                          SOLID
                                          WASTE
                          NOT
                         AVAIL
                          NOT
                         AVAIL
 NOT
AVAIL
 NOT
AVAIL
90/09 MEDIUM   SOLID      NOT        NOT
               WASTE     AVAIL      AVAIL
90/09 MEDIUM   WATER      NOT        NOT
                         AVAIL      AVAIL
 NOT
AVAIL
 NOT
AVAIL
            NOT
           AVAIL
                                                                         NOT
                                                                        AVAIL
90/09  HIGH    CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
                         DESIGN     TIMING    ESTIMATE
                           90/09  HIGH    SOLID    ADEQUATE  ADEQUATE   ADEQUATE
                                         WASTE     DESIGN    TIMING    ESTIMATE

-------
                                 FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                         DEPARTMENT OF ARMY                      ARMY MATERIAL COMMAND
                 PROJECT IDENTIFICATION
                                    REQ    EST   PROJECT
                 BUDGET     COMPL   COMPL  COMPL ASSESS- MEDIA
               (THOUSANDS)  STATUS  DATE   DATE  MENT    TYPE
                                                                                    ARMY-152
  ADEQUACY OF PROJECT
ENGIN-
EERING    TIME      COST
WI-213820054 PROJECT: BA-W-13
DES ROCKET AREA-LWT
ACCT: PAA(PEMA)
BADGER ARMY AMMO PLT
BARABOO
WI
WI-21382C054 PROJECT: BA-W-12
NITROGLYCERIN AREA LWT
ACCT: PAA(PEMA)
BADGER ARMY AMMO PLT
BARABOO                          WI
                                                      344.0  ESRO
                                                                           90/09 MEDIUM   WATER
                                                        6.0  OTHR   87/06  90/09  LOW
                                                                                          WATER
                                                                  ADEQUATE  ADEQUATE   ADEQUATE
                                                                   DESIGN    TIMING    ESTIMATE
                                                                  ADEQUATE  ADEQUATE   ADEQUATE
                                                                   DESIGN    TIMING    ESTIMATE
      TOTAL, ARMY MATERIAL COMMAND
                            342,237.0
                                                                                           512

-------
                                 FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                         DEPARTMENT OF ARMY                      US ARMY FORCES COMMAND
                PROJECT IDENTIFICATION
                     REQ    EST   PROJECT
  BUDGET     COMPL   COMPL  COMPL ASSESS-  MEDIA
(THOUSANDS}   STATUS  DATE   DATE   MENT     TYPE
                                                                                                                     ARMY-153
                            ADEQUACY OF  PROJECT
                          ENGIN-
                          EERING    TIME      COST
AK-214022146 PROJECT: RPTJ89S001
TDK TERMINAL PA/SI
ACCT: DERA - OMA (OPERATIONS AND MA
USARAL PDD TDK JUNCTION
FORT RICHARDSON                  AK

AK-214022155 PROJECT: GR0089S007
FAMILY HOUSING - RADON MITIGATION - GREELY
ACCT: AFHU920) SERIES (MAINT, REPA
FORT GREELY
FORT GREELY                      AK

AK-214022155 PROJECT: GR0089S008
RADON MITIGATION - GREELY
ACCT: OMA OPERATIONS & MAINT,ARMY
FORT G3EELY
FORT GREELY                      AK

AK-214022155 PROJECT: FTGR-89-01
RADON TESTING - GREELY
ACCT: OMA OPERATIONS t MAINT,ARMY
FORT GREELY
FORT GREELY                      AK

AK-214022155 PROJECT: GR0089S004
FIRE BURN PIT - GREELY (FY68)
ACCT: DERA - OMA (OPERATIONS AND MA
FORT GREELY
FORT GREELY                      AK

AK-214022155 PROJECT: GR0089S005
UST CLEANUP - FT GREELY (FY89)
ACCT: DE3A - OMA (OPERATIONS AND MA
FORT GREELY
FORT GREELY                      AK
      200.0  ESDP
        5.0  PSDF
       20.0   PSDF
       20.0  ESDL
      200.0   ESDP
                           91/09  HIGH     CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
                           90/09 MEDIUM     AIR
90/09 MEDIUM    AIR
                                                  ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
                                                  ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
90/09 MEDIUM    AIR     ADEQUATE   ADEQUATE   ADEQUATE
                         DESIGN    TIMING    ESTIMATE
                           90/10  HIGH
      100.0   ESDP    89/01   90/09  HIGH
               CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
                         DESIGN    TIMING    ESTIMATE
                                         SOLID    ADEQUATE  ADEQUATE   ADEQUATE
                                         WASTE     DESIGN    TIMING    ESTIMATE

-------
                                  FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                          DEPARTMENT  OF ARMY                      US ARMY FORCES COMMAND
                 PROJECT IDENTIFICATION
                     REQ     EST   PROJECT
  BUDGET     COMPL    COMPL   COMPL ASSESS- MEDIA
(THOUSANDS)   STATUS   DATE    DATE  MENT    TYPE
                                                                                                                     ARMY-15-4
                            ADEQUACY  OF  PROJECT
                          ENGIN-
                          EERING    TIME      COST
 AK-214022155 PROJECT:  GR0089S001
 HAZARDOUS WASTE  DISPOSAL  -  GREELY  (FY90)
 ACCT:  DMA OPERATIONS  & MAINT.ARMY
 FCRT GREELY
 FORT GREELY                      AK

 AK-214022155 PROJECT:  GR0089S017
 REPAIR/REPLACE POST-1965  USTS - GREELY
 ACCT:  OMA OPERATIONS  & MAINT.ARMY
 FORT GREELY
 FORT GREELY                      AK

 AK-214022155  PROJECT:  GR0089S009
 ASBESTOS  REMOVAL, FH BOILERS RMS-6REELY
 ACCT:  AFHI1920) SERIES  (MAINT, REPA
 FORT GREELY
 FORT GREELY                      AK

 AK-214022155  PROJECT:  FTGR-89-03
 ASBESTOS  REMOVAL - GREELY
 ACCT: OMA OPERATIONS & MAINT.ARMY
 FORT GREELY
 FORT 6REELY                      AK

 AK-214022155  PROJECT: CK120434J
 SPILL PREVENTION PROJECTS - GREELY
 ACCT: OMA OPERATIONS & MAINT,ARMY
 FORT GREELY
 FORT GREELY                      AK

AK-214022157  PROJECT: FTW-89-012
RADON TESTING - RICHARDSON
ACCT: OMA OPERATIONS & MAINT.ARMY
 FORT RICHARDSON
 FORT RICHARDSON                  AK
                                                       75.0  ESDP
                           90/09  HIGH    SOLID    ADEQUATE  ADEQUATE   ADEQUATE
                                         WASTE     DESIGN    TIMING    ESTIMATE
       15.0   ESDF    93/12   91/04 MEDIUM   SOLID    ADEQUATE  ADEQUATE   ADEQUATE
                                         WASTE     DESIGN    TIMING    ESTIMATE
      250.0   ESDF
      300.0   ESDF
      596.0   ESDF
       25.0   ESDL
                          90/09 MEDIUM   TOXIC    ADEQUATE  ADEQUATE   ADEQUATE
                                       SUBSTANCE   DESIGN    TIMING    ESTIMATE
                          90/09 MEDIUM   TOXIC    ADEQUATE  ADEQUATE   ADEQUATE
                                       SUBSTANCE   DESIGN    TIMING    ESTIMATE
                          90/09 MEDIUM   WATER
90/09 MEDIUM    AIR
                        ADEQUATE   ADEQUATE    ADEQUATE
                         DESIGN    TIMING    ESTIMATE
                                                  ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE

-------
                                 FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                         DEPARTMENT OF ARMY                      US ARMY FORCES COMMAND
                PROJECT IDENTIFICATION
                     REQ    EST    PROJECT
  BUDGET     COMPL   COMPL  COMPL  ASSESS- MEDIA
(THOUSANDS)   STATUS  DATE    DATE   MENT    TYPE
                                                                                                                     ARMY-155
                            ADEQUACY  OF  PROJECT
                          ENGIN-
                          EERING   TIME      COST
AK-214022157 PROJECT: F88-049
EA FOR BRIMFROST/MOBEX PLAN, ETC. ALL POSTS
ACCT: OMA OPERATIONS & MAINT.ARMY
FORT RICHARDSON
FORT RICHARDSON                  AK

AK-214022157 PROJECT: F88-043
EAGLE RIVER FLATS CONTAMINATION (FY 89)
ACCT: DERA - OMA (OPERATIONS AND MA
FORT RICHARDSON
FORT RICHARDSON                  AK

AK-214022157 PROJECT: RICK 0001
NIKE SITES B & C RI/FS/RA
ACCT: DERA - OMA (OPERATIONS AND MA
FORT RICHARDSON
FORT RICHARDSON                  AK

AK-214022157 PROJECT: FTW-89-002
PRE-1978 PCB CLEANUP, ROOSEVELT RD (FY88)
ACCT: DERA - OMA (OPERATIONS AND MA
FORT RICHARDSON
FORT RICHARDSON                  AK

AK-214022157 PROJECT: FTW-89-006
LANDFILL PLUME INVESTIGATE - RICHARDSON (FY89)
ACCT: DERA - OMA (OPERATIONS AND MA
FORT RICHARDSON
FORT RICHARDSON                  AK

AK-214022157 PROJECT: FTW-89-007
PA/SI HAINES TERMINAL
ACCT: DERA - OMA (OPERATIONS AND MA
FORT RICHARDSON
FORT RICHARDSON                  AK
       90.0  OTHR
      200.0   ESDP
    1,200.0  ESDP
      750.0  ESDP
      300.0  ESDP
      400.0   ESDP
90/09  LOW    MULTI     ADEQUATE  ADEQUATE    ADEQUATE
              MEDIA      DESIGN    TIMING    ESTIMATE
                           90/09   HIGH    CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
90/09  HIGH    CERCLA   ADEQUATE   ADEQUATE   ADEQUATE
                         DESIGN     TIMING    ESTIMATE
90/09  HIGH    CERCLA   ADEQUATE   ADEQUATE   ADEQUATE
                         DESIGN    TIMING    ESTIMATE
                           90/09  HIGH    CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
                           90/09  HIGH    CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE

-------
                                  FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                          DEPARTMENT OF ARMY                     US ARMY FORCES COMMAND
                 PROJECT IDENTIFICATION
                     REQ    EST   PROJECT
  BUDGET     COMPL    COMPL   COMPL ASSESS- MEDIA
(THOUSANDS)   STATUS   DATE    DATE  MENT    TYPE
                                                                     ARMY-156
  ADEQUACY OF PROJECT
ENGIN-
EERING    TIME      COST
 AK-214C22157 PROJECT:  F88-050
 SOIL/SLUDGE TREATMENT  STUDY, ALL  POSTS
 ACCT:  OMA OPERATIONS & MAINT.ARMY
 FORT RICHARDSON
 FORT RICHARDSON                  AK

 AK-214022157 PROJECT:  F88-045
 ASBESTOS  REMOVAL,  VAR  BLDGS - RICHARDSON
 ACCT:  OMA OPERATIONS & MAINT.ARMY
 FORT RICHARDSON
 FORT RICHARDSON                  AK

 AK-214022157  PROJECT:  XX111204J
 SPILL  PREVENTION PROJECTS - RICHARDSON
 ACCT:  OMA OPERATIONS & MAINT.ARMY
 FORT RICHARDSON
 FORT RICHARDSON                  AK

 AK-214022157  PROJECT:  FTW-89-008
 UPGRADE UST TO  MEET  FEDERAL EPA REGULATIONS
 ACCT:  OMA  OPERATIONS &  MAINT.ARMY
 FORT RICHARDSON
 FORT RICHARDSON                 AK

 AK-214022185  PROJECT: WAPL89S027
 RADON MITIGATION - RESERVE CENTER - RICHARDSON
 ACCT: OMAR(0&M  ARMY RESERVE)
 WHITTIER  ANCHORAGE PIPELINE
 FORT RICHARDSON                  AK

AK-214022185  PROJECT: WAPL89S028
RADON MITIGATION - RICHARDSON
ACCT: OMA OPERATIONS & MAINT.ARMY
WHITTIER ANCHORAGE PIPELINE
 FORT RICHARDSON                  AK
      300.0   ESDL
      300.0   ESDF
      80.0   ESDF
      190.0  ESDF
       2.0  PSDF
      20.0  PSDF
                           90/09  LOW     SOLID    ADEQUATE  ADEQUATE   ADEQUATE
                                         WASTE     DESIGN    TIMING    ESTIMATE
                          90/09 MEDIUM   TOXIC    ADEQUATE  ADEQUATE   ADEQUATE
                                       SUBSTANCE   DESIGN    TIMING    ESTIMATE
                          90/09 MEDIUM   WATER
                          90/09 MEDIUM   WATER
                                MEDIUM
                          90/09 MEDIUM
                                          AIR
                                          AIR
                                                  ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
                                                  ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
                                                  ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
                                                  ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE

-------
                                 FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                         DEPARTMENT OF ARMY                      US ARMY FORCES COMMAND
                PROJECT IDENTIFICATION
                     REQ    EST   PROJECT
  BUDGET     COMPL   COMPL  COMPL ASSESS- MEDIA
(THOUSANDS)  STATUS  DATE   DATE  MENT     TYPE
                                                                                                                     ARMY-157
  ADEQUACY OF PROJECT
ENGIN-
EERING    TIME      COST
AK-214022185 PROJECT: WAPL89S029
FAMILY HOUSING - RADON MITIGATION - RICHARDSON
ACCT: AFHU920) SERIES (MAINT, REPA
WHITTIER ANCHORAGE PIPELINE
FORT RICHARDSON                  AK

AK-214022185 PROJECT: WAPL89S009
FIRE BURN PITS-FT RICHARDSON (FY 88)
ACCT: DERA - OMA (OPERATIONS AND MA
WHITTIER ANCHORAGE PIPELINE
FORT RICHARDSON                  AK

AK-214022185 PROJECT: WAPL69S001
WHITTIER/ANCH PIPELINE PA/SI
ACCT: DERA - OMA (OPERATIONS AND MA
WHITTIER ANCHORAGE PIPELINE
FORT RICHARDSON                  AK

AK-214022185 PROJECT: WAPL89S002
WHITTIER TERMINAL PA/SI
ACCT: DERA - OMA (OPERATIONS AND MA
WHITTIER ANCHORAGE PIPELINE
FORT RICHARDSON                  AK

AK-214022185 PROJECT: WAPL89S004
LEAD PAINT PA/SI WHITTIER TERMINAL
ACCT: DERA - OMA (OPERATIONS AND MA
WHITTIER ANCHORAGE PIPELINE
FORT RICHARDSON                  AK

AK-214022185 PROJECT: WAPL89S006
LEAD PAINT PA/SI-ANCHORAGE TERMINAL
ACCT: DERA - OMA (OPERATIONS AND MA
WHITTIER ANCHORAGE PIPELINE
FORT RICHARDSON                  AK
        5.0  PSDF
      200.0  ESDP
      150.0  ESDP
      350.0  ESDP
      100.0  ESDP
      100.0  ESDF
                           90/09 MEDIUM    AIR
                           90/10   HIGH     CERCLA
                           93/10   HIGH    CERCLA
                           92/10   HIGH    CERCLA
                           91/09  HIGH    CERCLA
                           91/09 MEDIUM   CERCLA
                                                  ADEQUATE  ADEQUATE
                                                   DESIGN    TIMING
                   ADEQUATE
                   ESTIMATE
                                                  ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
                                                  ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
                                                  ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
                                                  ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
                                                  ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE

-------
                                  FEDERAL AGENCY  POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                          DEPARTMENT OF ARMY                      US ARMY FORCES COMMAND
                 PROJECT IDENTIFICATION
                     REQ     EST    PROJECT
  BUDGET     COMPL    COMPL   COMPL  ASSESS- MEDIA
(THOUSANDS)   STATUS   DATE    DATE   MENT    TYPE
                                                                     ARMY-158
    ADEQUACY OF PROJECT
  ENGIN-
  EERING    TIME      COST
 AK-214022185 PROJECT:  WAPL89S032
 AMMO AREA "A" LUST CLEAN-UP  -  RICHARDSON
 ACCT:  OMA OPERATIONS & MAINT.ARMY
 WHITTIER ANCHORAGE PIPELINE
 FORT RICHARDSON                 AK

 AK-214022185 PROJECT:  WAPLB9S012
 UST  CLEANUP-FT  RICHARDSON  (FY89)
 ACCT:  DERA  - OMA  (OPERATIONS AND MA
 WHITTIER ANCHORAGE  PIPELINE
 FORT RICHARDSON                 AK

 AK-2140221S5 PROJECT:  WAPL89S015
 HAZARDOUS HASTE DISPOSAL-RICHARDSON (FY90)
 ACCT:  OMA OPERATIONS & MAINT.ARMY
 WHITTIER ANCHORAGE  PIPELINE
 FORT RICHARDSON                  AK
      100.0   CMPA  89/06  90/09  HIGH    SOLID
                                         WASTE
      300.0   ESDP   89/01  90/09  HIGH    SOLID
                                         WASTE
      300.0   ESDP
                          90/09  HIGH
                                         SOLID
                                         WASTE
ADEQUATE  ADEQUATE   ADEQUATE
 DESIGN    TIMING    ESTIMATE
ADEQUATE  ADEQUATE   ADEQUATE
 DESIGN    TIMING    ESTIMATE
ADEQUATE  ADEQUATE   ADEQUATE
 DESIGN    TIMING    ESTIMATE
AK-21<*022185 PROJECT: F88-042
ANCHORAGE TERMINAL CLEANUP (FY 87)
ACCT: DERA - OMA (OPERATIONS AND MA
WHITTIER ANCHORAGE PIPELINE
FORT RICHARDSON                  AK
      500.0   ESDP   89/01  90/09  HIGH
                                         SOLID
                                         WASTE
ADEQUATE  ADEQUATE
 DESIGN    TIMING
ADEQUATE
ESTIMATE
AK-214022185 PROJECT: F88-051
UST CATHODIC PROTECTION - WHITTIER TERMINAL
ACCT: OMA OPERATIONS i. MAINT.ARMY
WHITTIER ANCHCRAGE PIPELINE
FORT RICHARDSON                  AK

AK-214022185 PROJECT: WAPL89S013
REPAIR REPLACE POST 1965 USTS - RICHARDSON
ACCT: OMA OPERATIONS & MAINT.ARMY
WHITTIER ANCHORAGE PIPELINE
FORT RICHARDSON                  AK
                                                      100.0  ESDF
                          90/09 MEDIUM   SOLID
                                         WASTE
       90.0  ESDF   93/12  90/09 MEDIUM   SOLID
                                         WASTE
ADEQUATE  ADEQUATE   ADEQUATE
 DESIGN    TIMING    ESTIMATE
ADEQUATE  ADEQUATE   ADEQUATE
 DESIGN    TIMING    ESTIMATE

-------
                                 FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                         DEPARTMENT OF ARMY                      US ARMY FORCES COMMAND
                PROJECT IDENTIFICATION
                     REQ    EST   PROJECT
  BUDGET     COMPL   COMPL  COMPL ASSESS-  MEDIA
(THOUSANDS)   STATUS  DATE    DATE   MENT     TYPE
                                                                                                                     ARMY-159
  ADEQUACY OF PROJECT
ENGIN-
EERING    TIME      COST
AK-214022185 PROJECT: WAPL89S007
UST CATHODIC PROTECTION-ANCH TERMINAL
ACCT: OMA OPERATIONS & MAINT,ARMY
WHITTIER ANCHORAGE PIPELINE
FORT RICHARDSON                  AK

AK-214022185 PROJECT: WAPL89S026
ASBESTOS REMOVAL, FH BOILER RMS - RICHARDSON
ACCT: AFHU920) SERIES (MAINT, REPA
WHITTIER ANCHORAGE PIPELINE
FORT RICHARDSON                  AK

AK-214022185 PROJECT: WAPL89S033
FUEL BLADDER CLEAN UP FAC - RICHARDSON
ACCT: OMA OPERATIONS & MAINT,ARMY
WHITTIER ANCHORAGE PIPELINE
FORT RICHARDSON                  AK

AK-214022342 PROJECT: GT0089S001
GERSTLE RIVER ASSESSMENT/MONITORING (FY 87)
ACCT: DERA - OMA (OPERATIONS AND MA
GERSTLE RIVER ARCTIC TEST SITE
FORT RICHARDSON                  AK

AK-21-+022426 PROJECT: WN0089S001
FAMILY HOUSING - RADON MITIGATION - WAINWRIGHT
ACCT: AFH(1920) SERIES (MAINT, REPA
FCRT WAINWRIGHT
FORT WAINWRIGHT                  AK

AK-214022426 PROJECT: WN0089S014
RADON MITIGATION - WAINWRIGHT
ACCT: OMA OPERATIONS 4 MAINT,ARMY
FORT WAINWRIGHT
FORT WAINWRIGHT                  AK
      100.0  ESRE
      525.0   ESDF
                           90/09  LOW      SOLID    ADEQUATE  ADEQUATE   ADEQUATE
                                          WASTE     DESIGN    TIMING    ESTIMATE
                           90/09  MEDIUM   TOXIC    ADEQUATE  ADEQUATE   ADEQUATE
                                        SUBSTANCE   DESIGN    TIMING    ESTIMATE
       50.0  ESDP   89/06   90/09   HIGH    WATER    ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
       25.0  CMPA
       10.0  PSDF
       60.0  PSDF
                           90/09   HIGH    CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
                           90/09 MEDIUM
                           90/09 MEDIUM
                                          AIR     ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
                                          AIR     ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE

-------
                                  FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                          DEPARTMENT OF ARMY                      US ARMY FORCES COMMAND
                 PROJECT IDENTIFICATION
                     REQ     EST    PROJECT
  BUDGET     COMPL   COMPL   COMPL  ASSESS- MEDIA
(THOUSANDS)   STATUS  DATE    DATE   MENT    TYPE
                                                                     ARMY-160
                            ADEQUACY OF PROJECT
                          ENGIN-
                          EERING    TIME      COST
 AK-214022426 PROJECT:  F88-055
 POWER PLANTS UPGRADE  AND  TESTING
 ACCT: DMA OPERATIONS  4 MAINT.ARMY
 FORT WAINWRIGHT
 FORT WAINWRIGHT                 AK

 AK-214022426 PROJECT:  FTWW-89-01
 RADON TESTING-  WAINWRIGHT  (FY 87)
 ACCT:  DMA OPERATIONS  £ MAINT.ARMY
 FORT WAINWRIGHT
 FORT WAINWRIGHT                 AK

 AK-214022426  PROJECT:  RICH  0005
 FT WAINWRIGHT LANDFILL INVESTIGATION
 ACCT: DERA - OMA (OPERATIONS  AND MA
 FORT WAINWRIGHT
 FORT WAINWRIGHT                  AK
                                                      100.0  ESRO
       25.0   ESDL
                           90/09   LOW      AIR
                           90/09  LOW      AIR
      250.0   ESDP   89/01  90/09  HIGH    CERCLA
                                                  ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
                                                  ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
                                                  ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
AK-214022426 PROJECT: WN0089S012
FIRE BURN PIT-WAINWRIGHT (FY 86)
ACCT: DERA - OMA (OPERATIONS AND MA
FORT WAINWRIGHT
FORT WAINWRIGHT                  AK
      ZOO.O   ESDP
                          90/10  HIGH    CERCLA
                                                  ADEQUATE  ADEQUATE
                                                   DESIGN    TIMING
                                             ADEQUATE
                                             ESTIMATE
AK-214022426 PROJECT: WN0089S013
HAZARDOUS WASTE DISPOSAL-WAINWRIGHT (FY 90)
ACCT: OMA OPERATIONS 4 MAINT.ARMY
FORT WAINWRIGHT
FORT WAINKRIGHT                  AK

AK-214022426 PROJECT: WN0089S019
UST CLEANUP - FT WAINWRIGHT (FY 89)
ACCT: DERA - OMA (OPERATIONS AND MA
FORT WAINWRIGHT
FORT WAINWRIGHT                  AK
     300.0  ESDP
90/09  HIGH
     300.0  ESDP   89/01  90/09  HIGH
                                         SOLID    ADEQUATE  ADEQUATE   ADEQUATE
                                         WASTE     DESIGN    TIMING    ESTIMATE
                                         SOLID    ADEQUATE  ADEQUATE   ADEQUATE
                                         WASTE     DESIGN    TIMING    ESTIMATE

-------
                                 FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                         DEPARTMENT OF ARMY                      US ARMY FORCES COMMAND
                PROJECT IDENTIFICATION
                     REQ    EST   PROJECT
  BUDGET     COMPL   COMPL  COMPL ASSESS-  MEDIA
(THOUSANDS)  STATUS  DATE   DATE   MENT     TYPE
                                                                                                                     ARMY-161
                            ADEQUACY  OF  PROJECT
                          ENGIN-
                          EERING   TIME      COST
AK-214022426 PROJECT: WN0089S020
REPAIR/REPLACE POST 1965 USTS - WAINWRISHT
ACCT: DMA OPERATIONS t MAINT,ARMY
FORT WAINWRIGHT
FORT WAINWRIGHT                  AK

AK-214022426 PROJECT: KN0089S004
ASBESTOS REMOVAL, FH BOILER RMS-WAINWRISHT
ACCT: AFHU920) SERIES (MAINT, REPA
FORT WAINWRIGHT
FORT WAINWRIGHT                  AK

AK-214022426 PROJECT: FTWW-89-03
WAINWRIGHT UTILIDOR ASBESTOS REMOVAL (FY 87)
ACCT: OMA OPERATIONS « MAINT,ARMY
FORT WAINKRIGHT
FORT WAINWRIGHT                  AK

AK-21
-------
                                  FEDERAL  AGENCY  POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                          DEPARTMENT OF  ARMY                      US ARMY FORCES COMMAND
                 PROJECT IDENTIFICATION
                     REQ     EST   PROJECT
  BUDGET     COMPL   COMPL   COMPL ASSESS- MEDIA
(THOUSANDS)   STATUS   DATE    DATE  MENT    TYPE
                                                                     ARMY-162
   ADEQUACY OF PROJECT
 ENGIN-
 EERING    TIME      COST
 AK-214022879 PROJECT:  FTW-89-001
 FAIRBANKS-EIELSON PIPELINE  PA/SI  (FY 89)
 ACCT:  DERA - DMA  (OPERATIONS AND  MA
 FAIRBANKS EIELSON PIPELINE
 FORT RICHARDSON                  AK

 AK-214022879 PROJECT:  FTW-89-003
 RI/FS  FUEL PLUME-FAIRBANKS  TERMINAL (FY88)
 ACCT:  DERA - DMA  (OPERATIONS AND  MA
 FAIRBANKS EIELSON PIPELINE
 FORT RICHARDSON                  AK

 AK-214022879 PROJECT:  FEPL89S002
 UST CATHODIC PROTECTION-FBKS TERMINAL
 ACCT: OMA  OPERATIONS & MAINT.ARMY
 FAIRBANKS  EIELSON  PIPELINE
 FORT RICHARDSON                   AK

 CA-214020436  PROJECT: FHL0068
 INSPECT REPAIR REPLACE BACKFLOW DEVICES
 ACCT: OMA  OPERATIONS & MAINT.ARMY
 FORT HUNTER  LIGGETT
 KING CITY                         CA

 CA-214020436  PROJECT: FHL089S001
 PREPARE HISTORIC PRESERVATION PLAN & LOG DOC
 ACCT: OMA  OPERATIONS & MAINT,ARMY
 FORT HUNTER  LIGGETT
KING CITY                        CA

CA-214020436  PROJECT: FHL089S002
ENVIRONMENTAL MITIGATION-KIT FOX
ACCT: OMA  OPERATIONS t MAINT.ARMY
FORT HUNTER  LIGGETT
KING CITY                        CA
      130.0   ESDP
      500.0   ESDP
       30.0   ESRE
                           90/09  HIGH    CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
                          90/09  HIGH    CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
                          90/09  LOW     SOLID    ADEQUATE  ADEQUATE   ADEQUATE
                                         WASTE     DESIGN    TIMING    ESTIMATE
      350.0   ESDP   88/06  90/09  HIGH   DRINKING  ADEQUATE  ADEQUATE   ADEQUATE
                                         WATER     DESIGN    TIMING    ESTIMATE
       10.0  ESDF   90/09  90/09 MEDIUM  MULTI
                                        MEDIA
      100.0  ESDF
                          90/09  HIGH   MULTI
                                        MEDIA
 NOT
AVAIL
 NOT
AVAIL
 NOT
AVAIL
 NOT
AVAIL
 NOT
AVAIL
 NOT
AVAIL

-------
                                 FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR  1991

                         DEPARTMENT OF ARMY                      US ARMY FORCES COMMAND
                PROJECT IDENTIFICATION
                     REQ    EST    PROJECT
  BUDGET     COMPL   COMPL  COMPL  ASSESS- MEDIA
(THOUSANDS)   STATUS  DATE    DATE   MENT    TYPE
                                                                                                                     ARMY-163
                            ADEQUACY OF  PROJECT
                          ENGIN-
                          EERING    TIME      COST
CA-214020436 PROJECT: FHL 0059
INSTALLATION ENVIRONMENTAL DOC. (NEPA)
ACCT: DMA OPERATIONS t MAINT.ARMY
FORT HUNTER LIGGETT
KING CITY                        CA

CA-214020436 PROJECT: FHL0060
INSTALLATION COME USE ZONES (ICUZ) REPORT
ACCT: DMA OPERATIONS & MAINT.ARMY
FORT HUNTER LIGGETT
KING CITY                        CA

CA-214020436 PROJECT: FHL0019
DDL TEMP MOTOR POOL
ACCT: CERA - DMA (OPERATIONS AND MA
FORT HUNTER LIGGETT
KING CITY                        CA

CA-2K020436 PROJECT: FHL0009
FHL SANITARY LANDFILL
ACCT: DERA - DMA (OPERATIONS AND MA
FORT HUNTER LIGGETT
KING CITY                        CA

CA-214020436 PROJECT: FHL0010
CDEC SITE 8J
ACCT: DERA - OMA (OPERATIONS AND MA
FORT HUNTER LIGGETT
KING CITY                        CA

CA-214020436 PROJECT: FHL0011
NEW FIRE DRILL PIT
ACCT: DERA - OMA (OPERATIONS AND MA
FORT HUNTER LIGGETT
KING CITY                        CA
       50.0  ESRO
        1.0  ESDL
90/09 MEDIUM  MULTI
              MEDIA
                           90/09   LOW
                                         NOISE
 NOT
AVAIL
                                                    NOT
                                                   AVAIL
 NOT
AVAIL
                                    NOT
                                  AVAIL
       50.0  ESDP   92/10   90/09  HIGH
       10.0  ESDP   92/10   90/09  HIGH
 NOT
AVAIL
                      NOT
                     AVAIL
       50.0   ESDP   92/10   92/01  HIGH    CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
       50.0  ESDP   92/10   90/09  HIGH    CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
               CERCLA    ADEQUATE  ADEQUATE   ADEQUATE
                         DESIGN    TIMING    ESTIMATE
               CERCLA    ADEQUATE  ADEQUATE   ADEQUATE
                        DESIGN    TIMING    ESTIMATE

-------
                                  FEDERAL AGENCY  POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                          DEPARTMENT OF  ARMY                      US ARMY FORCES COMMAND
                 PROJECT IDENTIFICATION
                     REq     EST    PROJECT
  BUDGET     COMPL   COMPL   COMPL  ASSESS- MEDIA
(THOUSANDS)   STATUS   DATE    DATE   MENT    TYPE
                                                                     ARMY-164
                            ADEQUACY  OF  PROJECT
                          ENGIN-
                          EERING   TIME      COST
 CA-214020436 PROJECT:  FHL0012
 OLD FIRE DRILL PIT
 ACCT:  DERA - DMA (OPERATIONS AND MA
 FORT HUNTER LIGGETT
 KING CITY                       CA

 CA-214020436 PROJECT:  FHL0014
 BATTERY  ACID NEUTRALIZATION PIT
 ACCT:  DERA - DMA (OPERATIONS AND MA
 FORT HUNTER LIGGETT
 KING CITY                       CA

 CA-214020436  PROJECT:  FHL0015
 BLDG 280  STORAGE
 ACCT:  DERA  -  DMA  (OPERATIONS AND MA
 FORT HUNTER  LIGGETT
 KING CITY                        CA

 CA-214020436  PROJECT:  FHL0016
 MILLER RANCH  POL
 ACCT: DERA  -  DMA  (OPERATIONS AND MA
 FORT HUNTER  LIGGETT
 KING CITY                        CA

 CA-214020436  PROJECT:  FHL0062
 WASTE ANALYSIS PLAN
 ACCT: DMA OPERATIONS & MAINT.ARMY
 FORT HUNTER LIGGETT
KING CITY                        CA

CA-214020436  PROJECT:  FHL089S003
HAZARDOUS WASTE DISPOSAL
ACCT: DMA OPERATIONS & MAINT.ARMY
 FORT HUNTER LIGGETT
KING CITY                        CA
       30.0   ESDP    92/10   90/09  HIGH    CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
      10<+.0   ESDP    92/10   90/09  HIGH    CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
       50.0   ESDP    92/10   90/09  HIGH
       50.0   ESDP    92/10   90/09  HIGH
        2.0   INOV
      200.0  ESDP
90/09  HISH
90/09  HIGH
                                         CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
               CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
                         DESIGN    TIMING    ESTIMATE
                                         SOLID    ADEQUATE  ADEQUATE   ADEQUATE
                                         WASTE     DESIGN    TIMING    ESTIMATE
                                         SOLID    ADEQUATE  ADEQUATE   ADEQUATE
                                         WASTE     DESIGN    TIMING    ESTIMATE

-------
                                 FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                         DEPARTMENT OF ARMY                      US ARMY FORCES COMMAND
                PROJECT IDENTIFICATION
                     REQ    EST   PROJECT
  BUDGET     COMPL   COMPL  COMPL ASSESS- MEDIA
(THOUSANDS)  STATUS  DATE   DATE  MENT    TYPE
                                                                                                                      ARMY-165
    ADEQUACY OF PROJECT
  ENGIN-
  EERING    TIME      COST
CA-214020436 PROJECT: FHL089S004
TANK RETROFIT/MONITORING
ACCT: OMA OPERATIONS ft MAINT.ARMY
FORT HUNTER LIGGETT
KING CITY                        CA

CA-214020436 PROJECT: FHL0035
UNDERGROUND TANK TESTING
ACCT: OMA OPERATIONS & MAINT.ARMY
FORT HUNTER LIGGETT
KING CITY                        CA

CA-214020436 PROJECT: FHL0061
INSTALLATION SPILL CONTINGENCY PLAN
ACCT: OMA OPERATIONS & MAINT.ARMY
FORT HUNTER LIGGETT
KING CITY                        CA

CA-214020436 PROJECT: FHL0041
HAZARDOUS MATERIAL SPILL RESPONSE TRAINING
ACCT: OMA OPERATIONS & MAINT.ARMY
FORT HUNTER LIGGETT
KING CITY                        CA

CA-214020436 PROJECT: FHL0058
LANDFILL CLOSURE
ACCT: OMA OPERATIONS & MAINT.ARMY
FORT HUNTER LIGGETT
KING CITY                        CA

CA-214020436 PROJECT: FHL0036 .
UNDERGROUND TANK) CLOSURE} REMOVAL DECON
ACCT: OMA OPERATIONS & MAINT.ARMY
FORT HUNTER LIGGETT
KING CITY                        CA
       50.0  ESDP   68/02  90/09  HIGH
       41.0  ESDP   85/06  90/09  HIGH
                                          SOLID     ADEQUATE  ADEQUATE   ADEQUATE
                                          WASTE     DESIGN    TIMING    ESTIMATE
                                          SOLID    ADEQUATE  ADEQUATE   ADEQUATE
                                          WASTE     DESIGN    TIMING    ESTIMATE
        1.0  ESDP   89/06  90/09  HIGH     SOLID    ADEQUATE  ADEQUATE   ADEQUATE
                                          WASTE     DESIGN    TIMING    ESTIMATE
       14.0  ESDP   88/09  90/09   HIGH    SOLID    ADEQUATE  ADEQUATE   ADEQUATE
                                         WASTE     DESIGN    TIMING    ESTIMATE
       50.0  ESDP   91/10   90/09  HIGH    SOLID
                                         WASTE
      100.0  ESDF   98/01   90/09 MEDIUM   SOLID
                                         WASTE
ADEQUATE  ADEQUATE   ADEQUATE
 DESIGN    TIMING    ESTIMATE
ADEQUATE  ADEQUATE    ADEQUATE
 DESIGN    TIMING    ESTIMATE

-------
                                  FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                          DEPARTMENT OF ARMY                     US ARMY FORCES COMMAND
                 PROJECT IDENTIFICATION
                     REQ     EST    PROJECT
  BUDGET     COMPL   COMPL   COMPL  ASSESS- MEDIA
(THOUSANDS)   STATUS  DATE    DATE   MENT    TYPE
                                                                                                                      ARMY-166
                            ADEQUACY OF  PROJECT
                          ENGIN-
                          EERING    TIME      COST
 CA-214020436 PROJECT:  FHL0037
 HAZARDOUS WASTE CONTAINMENT/MGMT  FACILITIES
 ACCT:  OMA OPERATIONS & MAINT,ARMY
 FORT HUNTER LIGGETT
 KING CITY                        CA

 CA-214020436 PROJECT:  FHL0018
 OLD  PX FACILITY
 ACCT:  OMA OPERATIONS & MAINT,ARMY
 FORT HUNTER LIGGETT
 KINS CITY                        CA

 CA-214020436 PROJECT:  FHL0077
 ASBESTOS  SURVEY/ABATEMENT PLAN
 ACCT:  OMA  OPERATIONS &  MAINT.ARMY
 FORT HUNTER  LIGGETT
 KING CITY                         CA

 CA-21<+020<+36  PROJECT:  FHL0040
 UPDATE SPILL  PLANS
 ACCT:  OMA  OPERATIONS &  MAINT.ARMY
 FORT HUNTER  LIGGETT
 KING CITY                        CA

 CA-21402CK+46  PROJECT:  IR0089S010
 CLOSE/CLEANUP ABANDONED LANDFILL SITES
 ACCT: DERA - OMA (OPERATIONS AND MA
 FORT IRWIN
 FORT IRWIN                       CA

CA-214020446  PROJECT: EN00057-6
HAZARDOUS WASTE MANAGEMENT CONTRACT
ACCT: OMA OPERATIONS 4  MAINT.ARMY
 FORT IRWIN
 FORT IRWIN                       CA
        5.0   ESRE    89/10   90/09   LOW     SOLID    ADEQUATE  ADEQUATE   ADEQUATE
                                         WASTE     DESIGN    TIMING    ESTIMATE
       50.0   OTHR    92/10   92/01   LOW     SOLID    ADEQUATE  ADEQUATE   ADEQUATE
                                         WASTE     DESIGN    TIMING    ESTIMATE
      150.0   ESDL
                          90/09  LOW     TOXIC    ADEQUATE  ADEQUATE   ADEQUATE
                                       SUBSTANCE   DESIGN    TIMING    ESTIMATE
        1.0   ESDP   88/09  90/09  HIGH    WATER    ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
      100.0   PSDF
91/09 MEDIUM   CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
                         DESIGN    TIMING    ESTIMATE
     500.0   ESDP   88/07  90/09  HIGH    SOLID    ADEQUATE  ADEQUATE   ADEQUATE
                                         WASTE     DESIGN    TIMING    ESTIMATE

-------
                                 FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                         DEPARTMENT OF ARMY                      US ARMY FORCES COMMAND
                PROJECT IDENTIFICATION
                     REQ    EST   PROJECT
  BUDGET     COMPL   COMPL  COMPL ASSESS- MEDIA
(THOUSANDS)  STATUS  DATE   DATE   MENT     TYPE
                                                                                                                     ARMY-167
   ADEQUACY OF PROJECT
 ENGIN-
 EERING    TIME      COST
CA-214020446 PROJECT: IR0089S002
REMOVE ABANDONED/LEAKING USTS
ACCT: DMA OPERATIONS ft MAINT.ARMY
FORT IRWIN
FORT IRWIN                       CA

CA-214020606 PROJECT: PM0069
INSPECT REPAIR REPLACE BACKFLOM DEVICES
ACCT: DMA OPERATIONS ft MAINT.ARMY
PRESIDIO OF MONTEREY
MONTEREY                         CA

CA-214020606 PROJECT: PM0089S001
PREPARE HISTORIC PRESERVATION PLAN & LOG DOC
ACCT: OMA OPERATIONS & MAINT.ARMY
PRESIDIO OF MONTEREY
MONTEREY                         CA

CA-214020606 PROJECT: PM0034
UNDERGROUND TANK TESTING
ACCT: OMA OPERATIONS & MAINT.ARMY
PRESIDIO OF MONTEREY
MONTEREY                         CA

CA-214020606 PROJECT: PM0033
UNDERGROUND TANKj CLOSURE, REMOVAL, DECON.
ACCT: OMA OPERATIONS & MAINT.ARMY
PRESIDIO OF MONTEREY
MONTEREY                         CA

CA-214020606 PROJECT: PM0076
ASBESTOS SURVEY / ABATEMENT PLAN
ACCT: OMA OPERATIONS « MAINT.ARMY
PRESIDIO OF MONTEREY
MONTEREY                         CA
       20.0  ESDF
                           90/09 MEDIUM   SOLID    ADEQUATE  ADEQUATE   ADEQUATE
                                          WASTE     DESIGN    TIMING    ESTIMATE
      250.0  ESDP   88/06  90/09  HIGH    DRINKING  ADEQUATE  ADEQUATE   ADEQUATE
                                         WATER     DESIGN    TIMING    ESTIMATE
        5.0  ESDF    90/09  90/09  MEDIUM  MULTI
                                        MEDIA
 NOT       NOT
AVAIL     AVAIL
      150.0  ESDL
 NOT
AVAIL
         .0  ESDP   92/10   90/09  HIGH    SOLID    ADEQUATE  ADEQUATE   ADEQUATE
                                         WASTE     DESIGN    TIMING    ESTIMATE
       16.0  ESDF   98/01   90/09 MEDIUM   SOLID    ADEQUATE  ADEQUATE   ADEQUATE
                                         WASTE     DESIGN    TIMING    ESTIMATE
                           90/09   LOW     TOXIC    ADEQUATE  ADEQUATE   ADEQUATE
                                       SUBSTANCE   DESIGN    TIMING    ESTIMATE

-------
                                  FEDERAL  AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                          DEPARTMENT OF  ARMY                      US ARMY FORCES COMMAND
                 PROJECT IDENTIFICATION
                     REQ     EST   PROJECT
  BUDGET     COMPL   COMPL   COMPL ASSESS- MEDIA
(THOUSANDS)   STATUS   DATE    DATE  MENT    TYPE
                                                                     ARMY-168
             ADEQUACY OF PROJECT
           ENGIN-
           EERING    TIME      COST
 CA-214020676  PROJECT:  FT0089S007
 PREPARE  AIR  EMISSIONS/TOXIC  EMISSIONS INV
 ACCT:  OMA  OPERATIONS  & MAINT.ARMY
 FORT  ORD
 SEASIDE                          CA

 CA-214020676  PROJECT:  FTO 0024
 INSPECT/REPAIR/REPLACE BACKFLOW DEVICES
 ACCT:  OMA  OPERATIONS & MAINT.ARMY
 FORT ORD
 SEASIDE                          CA

 CA-214020676  PROJECT:  FTO 0056
 INSTALLATION  ENVIRONMENTAL DOCUMENTATION
 ACCT: OMA OPERATIONS & MAINT,ARMY
 FORT ORD
 SEASIDE                          CA

 CA-214020676  PROJECT: FT00057
 INSTALLATION COMP. USE ZONES (ICUZ) REPORT
 ACCT: OMA OPERATIONS & MAINT.ARMY
 FORT ORD
 SEASIDE                          CA

 CA-214020676 PROJECT: FT00001
 FORT ORD LANDFILL
ACCT: DERA - OMA (OPERATIONS AND MA
 FORT ORD
SEASIDE                          CA

CA-214020676 PROJECT: FT00002
FAAF FIRE DRILL PIT
ACCT: DERA - OMA (OPERATIONS AND MA
FORT ORD
SEASIDE                          CA
       50.0   ESDP   89/08   90/09  HIGH     AIR     ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
      800.0   ESDP    88/06   90/09  HIGH   DRINKING  ADEQUATE  ADEQUATE   ADEQUATE
                                         WATER     DESIGN    TIMING    ESTIMATE
       25.0   OTHR
                          90/09  LOW
        1.0   ESDL   69/12  90/09  LOW
   10,000.0   INOV   94/10  90/09  HIGH
      80.0  INOV   91/10  90/09  HIGH
                                        MULT I
                                        MEDIA
                                         NOISE
           NOT
          AVAIL
                                                    NOT
                                                   AVAIL
 NOT
AVAIL
                     NOT
                    AVAIL
 NOT
AVAIL
            NOT
           AVAIL
CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
          DESIGN    TIMING    ESTIMATE
                                         CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE

-------
                                 FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                         DEPARTMENT OF ARMY                      US ARMY FORCES COMMAND
                PROJECT IDENTIFICATION
                     REQ    EST   PROJECT
  BUDGET     COMPL   COMPL  COMPL ASSESS- MEDIA
(THOUSANDS)  STATUS  DATE   DATE  MENT    TYPE
                                                                     ARMY-169
  ADEQUACY OF PROJECT
ENGIN-
EERING    TIME      COST
CA-214020676 PROJECT: FT00003
707 MAINTENANCE FACILITY
ACCT: DERA - OMA (OPERATIONS AND MA
FORT ORD
SEASIDE                          CA

CA-214020676 PROJECT: FT00004
MAIN FIRE DEPT DRILL PIT CERCLA STUDY
ACCT: DERA - OMA (OPERATIONS AND MA
FORT ORD
SEASIDE                          CA

CA-214020676 PROJECT: FT00006
14TH ENGRS MOTOR POOL
ACCT: DERA - OMA (OPERATIONS AND MA
FORT ORD
SEASIDE                          CA

CA-214020676 PROJECT: FT00007
FAAF BLDG 527 HANGAR
ACCT: DERA - OMA (OPERATIONS AND MA
FORT ORD
SEASIDE                          CA

CA-214020676 PROJECT: FT00008
DOL MAINT. * CANIBALLIZATION YARD
ACCT: DERA - OMA (OPERATIONS AND MA
FORT ORD
SEASIDE                          CA

CA-214020676 PROJECT: FT00067
AAFES MAIN SERVICE STATION
ACCT: DERA - OMA (OPERATIONS AND MA
FORT ORD
SEASIDE                          CA
      300.0  INOV   91/10  90/09  HIGH
       30.0  ESDP   91/10  90/09  HIGH
                                          CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
                                          CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
      300.0  ESDP   92/10  91/01   HIGH    CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
       80.0  ESDP   92/10   91/01  HIGH    CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
      140.0  ESDP   92/10   91/01  HIGH
      100.0  ESDP   88/11   90/09  HIGH
                                         CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
                                         CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE

-------
                                  FEDERAL  AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                          DEPARTMENT  OF ARMY                      US ARMY FORCES COMMAND
                 PROJECT IDENTIFICATION
                     REQ     EST    PROJECT
  BUDGET     COMPL   COMPL   COMPL  ASSESS- MEDIA
(THOUSANDS)   STATUS   DATE    DATE   MENT    TYPE
                                                                                                                     ARMY-170
             ADEQUACY OF PROJECT
           ENGIN-
           EERING    TIME      COST
 CA-214020676 PROJECT:  FT00065
 INSTALLATION SPILL  CONTINGENCY PLAN
 ACCT:  DMA OPERATIONS a MAINT,ARMY
 FORT ORD
 SEASIDE                          CA

 CA-214020676 PROJECT:  FT00053
 LANDFILL  CLOSURE
 ACCT:  DMA OPERATIONS 4 MAINT.ARMY
 FORT ORD
 SEASIDE                          CA

 CA-214020676  PROJECT:  FT00050
 HAZARDOUS  MATERIALS SPILL RESPONSE TRAINING
 ACCT; OMA  OPERATIONS & MAINT,ARMY
 FORT ORD
 SEASIDE                          CA

 CA-214020676  PROJECT:  FT0089S004
 UPDATE OPERATION PLAN  (PART B) APPLICATION
 ACCT: OMA  OPERATIONS & MAINT.ARMY
 FORT ORD
 SEASIDE                          CA

 CA-214020676  PROJECT:  FT0069S001
 TANK RETROF/MONITORING
 ACCT: OMA  OPERATIONS & MAINT.ARMY
 FORT ORD
SEASIDE                          CA

CA-214020676  PROJECT:  FT0089S002
TANK RETROFIT/MONITORING
ACCT: OMA  OPERATIONS & MAINT.ARMY
FORT ORD
SEASIDE                          CA
        2.0   ESDP    89/06   90/09  HIGH    SOLID
                                         WASTE
      100.0   ESDP    91/10  90/09  HIGH    SOLID
                                         WASTE
       35.0   ESDP   88/09  90/09  HIGH    SOLID
                                         WASTE
       8.0   ESDP
                          90/09  HIGH    SOLID
                                         WASTE
     800.0  ESDP   88/02  90/09  HIGH
       10.0  ESDP   88/02  90/09  HIGH
SOLID
WASTE
                                         SOLID
                                         WASTE
         ADEQUATE  ADEQUATE   ADEQUATE
          DESIGN    TIMING    ESTIMATE
         ADEQUATE  ADEQUATE   ADEQUATE
          DESIGN    TIMING    ESTIMATE
         ADEQUATE  ADEQUATE   ADEQUATE
          DESIGN    TIMING    ESTIMATE
         ADEQUATE  ADEQUATE   ADEQUATE
          DESIGN    TIMING    ESTIMATE
                                                  ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
         ADEQUATE  ADEQUATE   ADEQUATE
          DESIGN    TIMING    ESTIMATE

-------
                                 FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                         DEPARTMENT OF ARMY                      US ARMY FORCES COMMAND
                PROJECT IDENTIFICATION
                     REQ    EST   PROJECT
  BUDGET     COMPL   COMPL  COMPL  ASSESS- MEDIA
(THOUSANDS)   STATUS  DATE   DATE   MENT    TYPE
                                                                                                                     ARMY-171
                            ADEQUACY OF PROJECT
                          ENGIN-
                          EERING    TIME      COST
CA-214020676 PROJECT: FT00042
UNDERGROUND TANK! TESTING
ACCT: OMA OPERATIONS & MAINT.ARMY
FORT ORD
SEASIDE                          CA

CA-214020676 PROJECT: FT00046
HAZARDOUS WASTE CONTAINMENT/MGMT FACILITIES
ACCT: OMA OPERATIONS & MAINT.ARMY
FORT ORD
SEASIDE                          CA

CA-214020676 PROJECT: FT00048
USED SOLVENT ELIMINATION-HAZ MIN
ACCT: DERA - OPA (OTHER PROCUREMENT
FORT ORD
SEASIDE                          CA

CA-214020676 PROJECT: FT00049
HAZARDOUS CONTAINER CLEANING FACILITY
ACCT: OMA OPERATIONS t MAINT.ARMY
FORT ORD
SEASIDE                          CA

CA-214020676 PROJECT: FT00043
UNDERGROUND TANK! CLOSURE! REMOVAL, DECON
ACCT: OMA OPERATIONS i MAINT.ARMY
FORT ORD
SEASIDE                          CA

CA-214020676 PROJECT: FT0089S003
HAZARDOUS WASTE DISPOSAL
ACCT: OMA OPERATIONS & MAINT.ARMY
FORT ORD
SEASIDE                          CA
      120.0  ESDP   92/10   90/09  HIGH
       10.0  ESDP   89/01   90/09  HIGH
    2,000.0  ESDF
                                          SOLID
                                          WASTE
                                          SOLID
                                          WASTE
       50.0  ESDP   92/10   90/09   HIGH    SOLID
                                         WASTE
        5.0  ESDP   92/10   90/09   HIGH    SOLID
                                         WASTE
      100.0  ESDF   96/10   90/09 MEDIUM   SOLID
                                         WASTE
90/09 MEDIUM   SOLID
               WASTE
                        ADEQUATE  ADEQUATE    ADEQUATE
                         DESIGN    TIMING    ESTIMATE
                        ADEQUATE  ADEQUATE    ADEQUATE
                         DESIGN    TIMING    ESTIMATE
                        ADEQUATE   ADEQUATE    ADEQUATE
                         DESIGN    TIMING    ESTIMATE
                        ADEQUATE   ADEQUATE   ADEQUATE
                         DESIGN    TIMING    ESTIMATE
                        ADEQUATE  ADEQUATE   ADEQUATE
                         DESIGN    TIMING    ESTIMATE
                                                  ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE

-------
                                  FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                          DEPARTMENT OF  ARMY                      US ARMY FORCES COMMAND
                 PROJECT IDENTIFICATION
                     REQ    EST    PROJECT
  BUDGET     COMPL   COMPL   COMPL  ASSESS- MEDIA
(THOUSANDS)   STATUS  DATE    DATE   MENT    TYPE
                                                                     ARMY-172
             ADEQUACY OF PROJECT
           ENGIN-
           EERING    TIME      COST
 CA-214020676 PROJECT:  FT00055
 RECYCLING PROGRAM CONTRACT
 ACCT:  OMA OPERATIONS  & MAINT.ARMY
 FORT ORD
 SEASIDE                          CA

 CA-214020676 PROJECT:  FT0089S005
 ASBESTOS  ABATEMENT PROJECTS
 ACCT:  OMA OPERATIONS  & MAINT.ARMY
 FORT ORO
 SEASIDE                          CA

 CA-214020676  PROJECT:  FT00052
 ASBESTOS  SURVEY AND PLAN
 ACCT:  OMA  OPERATIONS &  MAINT.ARMY
 FORT ORD
 SEASIDE                          CA

 CA-214020676  PROJECT:  FT00051
 CHEMICAL ANALYSES
 ACCT:  OMA  OPERATIONS t  MAINT.ARMY
 FORT ORD
 SEASIDE                          CA

 CA-214020676  PROJECT:  FT00047
 UPDATE SPILL  PLANS
 ACCT: OMA  OPERATIONS & MAINT.ARMY
 FORT ORD
 SEASIDE                          CA

CA-214020791  PROJECT:  PSFOS9S003
RENEW AIR  EMISSIONS SOURCE OPERATIONS PERMITS
ACCT: OMA  OPERATIONS & MAINT.ARMY
 PRESIDIO OF SAN FRANCISCO
 PRESIDION  SAN FRANCISCO          CA
       50.0   ESDL   92/10   90/09 MEDIUM   SOLID    ADEQUATE  ADEQUATE   ADEQUATE
                                         WASTE     DESIGN    TIMING    ESTIMATE
      500.0   ESDF    90/09   90/09 MEDIUM   TOXIC    ADEQUATE  ADEQUATE   ADEQUATE
                                       SUBSTANCE   DESIGN    TIMING    ESTIMATE
       20.0   ESDL
                           90/09   LOW     TOXIC    ADEQUATE  ADEQUATE   ADEQUATE
                                       SUBSTANCE   DESIGN    TIMING    ESTIMATE
      100.0   ESDP    91/10  90/09  HIGH    WATER    ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
        1.0  ESDP   92/10  90/09  HIGH
       5.0  ESRO
                          90/09  LOW
WATER    ADEQUATE  ADEQUATE   ADEQUATE
          DESIGN    TIMING    ESTIMATE
                                          AIR     ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE

-------
                                 FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                         DEPARTMENT OF ARMY                      US ARMY FORCES COMMAND
                PROJECT IDENTIFICATION
                     REQ    EST   PROJECT
  BUDGET     COMPL   COMPL  COMPL ASSESS-  MEDIA
(THOUSANDS)  STATUS  DATE   DATE   MENT     TYPE
                                                                     ARMY-173
                            ADEQUACY OF  PROJECT
                          ENGIN-
                          EERING    TIME      COST
CA-214020791 PROJECT: PSFOS9S012
REMOVE HAZARDOUS WASTE PSF
ACCT: OMA OPERATIONS * MAINT.ARMY
PRESIDIO OF SAN FRANCISCO
PRESIDION SAN FRANCISCO          CA

CA-214020791 PROJECT: PSF089S013
REMOVE HAZARDOUS WASTES AT RESERVE CENTERS
ACCT: OMARtOtM ARMY RESERVE)
PRESIDIO OF SAN FRANCISCO
PRESIDION SAN FRANCISCO          CA

CA-214020791 PROJECT: PSF089S008
REMOVE ASBESTOS IN PSF FAMILY HOUSING BLDGS
ACCT: AFH(1920) SERIES (MAINT, REPA
PRESIDIO OF SAN FRANCISCO
PRESIDION SAN FRANCISCO          CA

CA-214020791 PROJECT: PSF089S009
REMOVE FRIABLE ASBESTOS IN RESERVE CENTERS
ACCT: OMARIO&M ARMY RESERVE)
PRESIDIO OF SAN FRANCISCO
PRESIDION SAN FRANCISCO          CA

CA-214020791 PROJECT: PSF089S010
REMOVE FRIABLE ASBESTOS IN PSF
ACCT: OMA OPERATIONS ft MAINT,ARMY
PRESIDIO OF SAN FRANCISCO
PRESIDION SAN FRANCISCO          CA

CO-214020150 PROJECT: FTC089S006
RADON MITIGATION
ACCT: OMA OPERATIONS ft MAINT,ARMY
FORT CARSON
FORT CARSON                      CO
      140.0  ESDP
       40.0  ESDP
      600.0  ESDF
       50.0   ESDF
      450.0   ESDF
      100.0   ESDP
90/09  HIGH    SOLID    ADEQUATE  ADEQUATE    ADEQUATE
               WASTE     DESIGN    TIMING    ESTIMATE
90/09  HIGH    SOLID    ADEQUATE  ADEQUATE    ADEQUATE
               WASTE     DESIGN    TIMING     ESTIMATE
90/09 MEDIUM   TOXIC    ADEQUATE  ADEQUATE    ADEQUATE
             SUBSTANCE   DESIGN    TIMING     ESTIMATE
90/09 MEDIUM   TOXIC    ADEQUATE   ADEQUATE   ADEQUATE
             SUBSTANCE   DESIGN    TIMING    ESTIMATE
90/09 MEDIUM   TOXIC    ADEQUATE  ADEQUATE   ADEQUATE
             SUBSTANCE   DESIGN    TIMING    ESTIMATE
                           90/09  HIGH     AIR
                          NOT       NOT
                         AVAIL     AVAIL
 NOT
AVAIL

-------
                                  FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR  1991

                          DEPARTMENT OF ARMY                      US ARMY FORCES COMMAND
                 PROJECT  IDENTIFICATION
                     REQ    EST   PROJECT
  BUDGET     COMPL    COMPL  COMPL ASSESS- MEDIA
(THOUSANDS)   STATUS   DATE   DATE  MENT    TYPE
                                                                                                                     ARMY-1
  ADEQUACY OF PROJECT
ENGIN-
EERING    TIME      COST
 CO-214020150  PROJECT:  FTC089S007
 RADON  GAS  MITIGATION
 ACCT:  DMA  OPERATIONS  & MAINT,ARMY
 FORT CARSON
 FORT CARSON                      CO

 CO-214020150  PROJECT:  FTC089S008
 RADON  GAS  MITIGATION
 ACCT:  OMA  OPERATIONS  & MAINT,ARMY
 FORT CARSON
 FORT CARSON                      CO

 CO-214020150  PROJECT:  FTC089S035
 SOLVENT RECOVERY SYSTEM BLDG 8000
 ACCT:  OMA  OPERATIONS  & MAINT.ARMY
 FORT CARSON
 FORT CARSON                      CO

 CO-214020150  PROJECT:  FTC-RADON1
 TEST RADON
 ACCT:  OMA  OPERATIONS & MAINT.ARMY
 FORT CARSON
 FORT CARSON                      CO

 CO-214020150  PROJECT:  FTC089S026
 AIR EMISSION  PERMITS
 ACCT:  OMA  OPERATIONS & MAINT.ARMY
 FORT CARSON
 FORT CARSON                      CO

CO-214020150  PROJECT: FTC089S019
AIR QUALITY MONITORIN  (FC)
ACCT: OMA OPERATIONS & MAINT.ARMY
 FORT CARSON
 FORT CARSON                      CO
      150.0   ESDP
       80.0   ESDP
       20.0   ESDP
       25.0   ESDL
       5.0  ESDL
       12.0  ESDL
                          90/09  HIGH     AIR
                          90/09  HIGH     AIR
                          90/09 MEDIUM    AIR
                          90/09 MEDIUM    AIR
                          90/09  LOW      AIR
                          90/09 MEDIUM    AIR
                                                  ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
                                                  ADEQUATE  ADEQUATE
                                                   DESIGN    TIMING
                                                  ADEQUATE  ADEQUATE
                                                   DESIGN    TIMING
                                                    NOT
                                                   AVAIL
          NOT
         AVAIL
                                                  ADEQUATE  ADEQUATE
                                                   DESIGN    TIMING
                                                  ADEQUATE  ADEQUATE
                                                   DESIGN    TIMING
                   ADEQUATE
                   ESTIMATE
                   ADEQUATE
                   ESTIMATE
 NOT
AVAIL
                   ADEQUATE
                   ESTIMATE
                   ADEQUATE
                   ESTIMATE

-------
                                 FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                         DEPARTMENT OF ARMY                      US ARMY FORCES COMMAND
                PROJECT IDENTIFICATION
                     REQ    EST   PROJECT
  BUDGET     COMPL   COMPL  COMPL ASSESS-  MEDIA
(THOUSANDS)  STATUS  DATE   DATE  MENT    TYPE
                                                                                                                     ARMY-175
  ADEQUACY OF PROJECT
ENGIN-
EERING    TIME      COST
CO-214020150 PROJECT: FTC089S048                       50.0  ESDP
CROSS CONNECTION CONTROL OF POTABLE WATER LINES
ACCT: OMA OPERATIONS & MAINT.ARMY
FORT CARSON
FORT CARSON                      CO

CO-214020150 PROJECT: FTC089S028                       15.0  ESDL
ENVIRONMENTAL EDUCATION AND AWARENESS
ACCT: OMA OPERATIONS & MAINT.ARMY
FORT CARSON
FORT CARSON                      CO

CO-2H020150 PROJECT: FTC089S024                       10.0  ESDL
LABORATORY EQUIPMENT MAINTENANCE
ACCT: OMA OPERATIONS & MAINT.ARMY
FORT CARSON
FORT CARSON                      CO

CO-214020150 PROJECT: FTC089S021                       45.0  ESDL
COMPUTER INFORMATION SYSTEM
ACCT: OMA OPERATIONS & MAINT.ARMY
FORT CARSON
FORT CARSON                      CO

CO-2K020150 PROJECT: FTC089S003                       10.0  ESDL
ENERGY RECOVERY SYSTEM MAINTENANZCE
ACCT: OMA OPERATIONS & MAINT.ARMY
FORT CARSON
FORT CARSON                      CO

CO-214020150 PROJECT: FTC089S022                      199.0  OTHR
LEASES OF EQUIPMENT AND VEHICLES
ACCT: OMA OPERATIONS & MAINT.ARMY
FORT CARSON
FORT CARSON                      CO
                           90/09  HIGH    DRINKING    NOT       NOT        NOT
                                          WATER     AVAIL     AVAIL      AVAIL
                           90/09 MEDIUM  MULTI       NOT       NOT        NOT
                                         MEDIA      AVAIL     AVAIL      AVAIL
                           90/09  LOW     MULTI       NOT       NOT        NOT
                                         MEDIA      AVAIL     AVAIL      AVAIL
                           90/09  LOW     MULTI       NOT       NOT        NOT
                                         MEDIA      AVAIL     AVAIL      AVAIL
                           90/09 MEDIUM   MULTI       NOT       NOT        NOT
                                         MEDIA      AVAIL     AVAIL      AVAIL
                           90/09   LOW    MULTI       NOT       NOT        NOT
                                        MEDIA      AVAIL     AVAIL      AVAIL

-------
                                  FEDERAL  AGENCY  POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                          DEPARTMENT  OF  ARMY                      US ARMY FORCES COMMAND
                 PROJECT IDENTIFICATION
                     REQ     EST    PROJECT
  BUDGET     COMPL   COMPL   COMPL  ASSESS- MEDIA
(THOUSANDS)   STATUS  DATE    DATE   MENT    TYPE
                                                                     ARMY-176
  ADEQUACY OF PROJECT
ENGIN-
EERING    TIME      COST
 CO-214020150 PROJECT:  FTC089S023
 ENVIRONMENTAL SUPPLIES
 ACCT:  OMA OPERATIONS & MAINT,ARMY
 FORT CARSON
 FORT CARSON                     CO

 CO-214020150 PROJECT:  FTC089S027
 CULTURAL  REOSURCE MANGEMENT  (FC)
 ACCT:  OMA OPERATIONS & MAINT.ARMY
 FORT CARSON
 FORT CARSON                     CO

 CO-214020150 PROJECT:  FTC089S015
 TRAINING  FOR ENVIRONMENTAL STAFF
 ACCT:  OMA  OPERATIONS & MAINT,ARMY
 FORT CARSON
 FORT CARSON                     CO

 CO-214020150  PROJECT:  FTC089S016
 CIVILIAN PAY
 ACCT:  OMA  OPERATIONS &  MAINT.ARMY
 FORT CARSON
 FORT CARSON                      CO

 CO-214020150  PROJECT:  FTC089S014
TOY
ACCT: OMA  OPERATIONS &  MAINT.ARMY
 FORT CARSON
 FORT CARSON                      CO

CO-214020150  PROJECT:  FTC089S029
 ENVIRONMENTAL MANAGEMENT SERVICES
ACCT: OMA  OPERATIONS & MAINT.ARMY
FORT CARSON
FORT CARSON                      CO
                                                      190.0  OTHR
       89.0   OTHR
       38.0   OTHR
      350.0   OTHR
      43.0  OTHR
      100.0  OTHR
                           90/09 MEDIUM  MULTI       NOT       NOT        NOT
                                        MEDIA      AVAIL     AVAIL      AVAIL
                           90/09 MEDIUM  MULTI       NOT       NOT        NOT
                                        MEDIA      AVAIL     AVAIL      AVAIL
                          90/09 MEDIUM  MULTI       NOT       NOT        NOT
                                        MEDIA      AVAIL     AVAIL      AVAIL
                          90/09  LOW    MULTI       NOT       NOT        NOT
                                        MEDIA      AVAIL     AVAIL      AVAIL
                          90/09 MEDIUM  MULTI       NOT       NOT        NOT
                                        MEDIA      AVAIL     AVAIL      AVAIL
                          90/09 MEDIUM  MULTI       NOT       NOT        NOT
                                        MEDIA      AVAIL     AVAIL      AVAIL

-------
                                 FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                         DEPARTMENT OF ARMY                      US ARMY FORCES COMMAND
                PROJECT IDENTIFICATION
                     REQ    EST   PROJECT
  BUDGET     COMPL   COMPL  COMPL ASSESS- MEDIA
(THOUSANDS)  STATUS  DATE   DATE   MENT    TYPE
                                                                     ARMY-177
   ADEQUACY OF PROJECT
 ENGIN-
 EERING    TIME      COST
CO-214020150 PROJECT: FTC089S025
ICUZ UPDATE
ACCT: DMA OPERATIONS ft MAINT.ARMY
FORT CARSON
FORT CARSON                      CO

CO-214020150 PROJECT: FTC089S020
NOISE MONITORING (FC)
ACCT: DMA OPERATIONS & MAINT.ARMY
FORT CARSON
FORT CARSON                      CO

CO-214020150 PROJECT: FA000278P
DESIGN & CONSTRUCT PEST CONTROL FACILITY
ACCT: OMA OPERATIONS & MAINT.ARMY
FORT CARSON
FORT CARSON                      CO

CO-214020150 PROJECT: CAR00010
TEST USTS AND PIPING
ACCT: OMA OPERATIONS & MAINT.ARMY
FORT CARSON
FORT CARSON                      CO

CO-214020150 PROJECT: CAR00011
CLEAN AND REMOVE USTS
ACCT: DERA - OMA (OPERATIONS AND MA
FORT CARSON
FORT CARSON                      CO

CO-214020150 PROJECT: CAR 0005
UST LEAK DETECTION
ACCT: OMA OPERATIONS & MAINT.ARMY
FORT CARSON
FORT CARSON                      CO
       20.0  PSDF
        7.0  ESDL
      190.0   PSDF
                           90/09  LOW
                           90/09   LOW
                                         NOISE
                                         NOISE
                                                    NOT
                                                   AVAIL
                                                    NOT
                                                   AVAIL
    2,150.0   ESDP    98/12  90/09  HIGH
      125.0   ESDP    98/12  90/09  HIGH
                                         SOLID
                                         WASTE
                                         SOLID
                                         WASTE
 NOT
AVAIL
 NOT
AVAIL
           NOT
          AVAIL
           NOT
          AVAIL
                           90/09   LOW   PESTICIDES   NOT       NOT
                                                   AVAIL     AVAIL
      155.0   ESDP   98/12   90/09  HIGH    SOLID      NOT       NOT
                                         WASTE     AVAIL     AVAIL
 NOT
AVAIL
 NOT
AVAIL
            NOT
           AVAIL
            NOT
           AVAIL
                      NOT
                     AVAIL
                      NOT
                     AVAIL
 NOT
AVAIL
 NOT
AVAIL

-------
                                  FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                          DEPARTMENT OF ARMY                      US ARMY FORCES COMMAND
                 PROJECT IDENTIFICATION
                     REG)     EST   PROJECT
  BUDGET     COMPL    COMPL   COMPL ASSESS- MEDIA
(THOUSANDS)   STATUS   DATE    DATE  MENT    TYPE
                                                                                                                     ARMY-178
   ADEQUACY OF PROJECT
 ENGIN-
 EERING    TIME      COST
 CO-214020150  PROJECT:  CAR  0007
 UST CORRECTIVE  ACTIONS
 ACCT:  DERA  -  DMA  (OPERATIONS AND MA
 FORT CARSON
 FORT CARSON                     CO

 CQ-214020150  PROJECT:  CAR  0008
 OB/OD  RANGE CORRECTIVE ACTIONS
 ACCT:  DERA  -  DMA  (OPERATIONS AND MA
 FORT CARSON
 FORT CARSON                     CO

 CO-214020150  PROJECT:  FTC089S013
 CLEAN  UNDERGROUND STORAGE TANKS CONTAMINATED
 ACCT:  OMA OPERATIONS t MAINT,ARMY
 FORT CARSON
 FORT CARSON                     CO

 CO-214020150  PROJECT: FTC089S011
 UST  UPGRADE OR REPLACEMENT
 ACCT:  OMA OPERATIONS & MAINT.ARMY
 FORT CARSON
 FORT CARSON                      CO

 CO-214020150  PROJECT: FTC089S012
 UST  SITE INVESTIGATIONS
ACCT: OMA OPERATIONS & MAINT.ARMY
 FORT CARSON
 FORT CARSON                      CO

CO-214020150  PROJECT: FTC089S031
 INSTALL SOLVENT RECOVERY SYSTEMS
ACCT: DERA  - OMA (OPERATIONS AND MA
 FORT CARSON
 FORT CARSON                      CO
                                                      750.0  ESDP
       <+5.0   ESDP
      150.0   ESDP
                           90/09  HIGH    SOLID
                                         WASTE
                          90/09  HIGH    SOLID
                                         WASTE
                          90/09  HIGH    SOLID
                                         WASTE
    1,100.0   ESDP   98/12  90/12  HIGH    SOLID
                                         WASTE
      300.0   ESDP
       20.0   ESDP
                          90/12  HIGH
                          90/09  HIGH
                                         SOLID
                                         WASTE
                                         SOLID
                                         WASTE
 NOT
AVAIL
 NOT
AVAIL
 NOT
AVAIL
 NOT
AVAIL
 NOT
AVAIL
 NOT
AVAIL
 NOT
AVAIL
 NOT
AVAIL
 NOT
AVAIL
 NOT
AVAIL
 NOT
AVAIL
 NOT
AVAIL
 NOT
AVAIL
 NOT
AVAIL
 NOT
AVAIL
 NOT
AVAIL
 NOT
AVAIL
 NOT
AVAIL

-------
                                 FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR  FISCAL  YEAR  1991

                         DEPARTMENT OF ARMY                      US ARMY FORCES COMMAND
                PROJECT IDENTIFICATION
                     RE<3    EST    PROJECT
  BUDGET     COMPL   COMPL  COMPL  ASSESS- MEDIA
(THOUSANDS)   STATUS  DATE    DATE   MENT    TYPE
                                                                                                                     ARMY-179
   ADEQUACY OF PROJECT
 ENGIN-
 EERING    TIME      COST
CO-214020150 PROJECT: FTC089S032
HAZARDOUS WASTE ANALYSIS
ACCT: DMA OPERATIONS & MAINT.ARMY
FORT CARSON
FORT CARSON                      CO

CO-214020150 PROJECT: FTC089S033
INSTALLATION HAZARDOUS WASTE DISPOSAL
ACCT: OMA OPERATIONS & MAINT.ARMY
FORT CARSON
FORT CARSON                      CO

CO-214020150 PROJECT: FTC089S034
HAZARDOUS WASTE TRAINING
ACCT: OMA OPERATIONS & MAINT.ARMY
FORT CARSON
FORT CARSON                      CO

CO-214020150 PROJECT: CAR 0001
USED SOLVENT ELIMINATION PROGRAM
ACCT: OMA OPERATIONS & MAINT.ARMY
FORT CARSON
FORT CARSON                      CO

C0-21<+020150 PROJECT: FTC089S036
WASTE OIL COLLECTION INSTALLTION WIDE
ACCT: OMA OPERATIONS & MAINT.ARMY
FORT CARSON
FORT CARSON                      CO

CO-214020150 PROJECT: F68-003
CONSTRUCT MUNITIONS INCINERATOR
ACCT: CMA OPERATIONS & MAINT.ARMY
FORT CARSON
FORT CARSON                      CO
       50.0  ESDP
      150.0  ESDP
      100.0  ESDP
      120.0  ESDP
       45.0  ESDP
      500.0  ESDF
                           90/09  HIGH
                           90/10  HIGH
                                         SOLID
                                         WASTE
                                         SOLID
                                         WASTE
                           90/09  HIGH    SOLID
                                         WASTE
                           90/09  HIGH    SOLID
                                         WASTE
                           90/09  HIGH    SOLID
                                         WASTE
                           90/09 MEDIUM   SOLID
                                         WASTE
 NOT
AVAIL
 NOT
AVAIL
 NOT
AVAIL
 NOT
AVAIL
 NOT
AVAIL
 NOT
AVAIL
 NOT
AVAIL
 NOT
AVAIL
 NOT
AVAIL
 NOT
AVAIL
 NOT
AVAIL
 NOT
AVAIL
 NOT
AVAIL
 NOT
AVAIL
 NOT
AVAIL
 NOT
AVAIL
 NOT
AVAIL
 NOT
AVAIL

-------
                                  FEDERAL  AGENCY  POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                          DEPARTMENT OF  ARMY                      US ARMY FORCES COMMAND
                 PROJECT IDENTIFICATION
                     REQ    EST    PROJECT
  BUDGET     COMPL   COMPL  COMPL  ASSESS- MEDIA
(THOUSANDS)   STATUS  DATE    DATE   MENT    TYPE
                                                                     ARMY-180
   ADEQUACY OF PROJECT
 ENGIN-
 EERING    TIME      COST
 CO-214020150 PROJECT:  CAR  0002
 INACTIVE LANDFILL NO 2 LEACHATE CONTROL
 ACCT:  DMA OPERATIONS & MAINT.ARMY
 FORT CARSON
 FORT CARSON                     CO

 CO-214020150 PROJECT:  CAR  0003
 INACTIVE LANDFILL NO 6 LEACHATE CONTROL
 ACCT:  DMA OPERATIONS & MAINT.ARMY
 FORT CARSON
 FORT CARSON                     CO

 CO-214020150  PROJECT:  CAR  0004
 INACTIVE  LANDFILL  NO 5 LEACHATE CONTROL
 ACCT:  OMA  OPERATIONS &  MAINT.ARMY
 FORT CARSON
 FORT CARSON                      CO

 CO-214020150  PROJECT:  FTC089S005
 ASBESTOS REMOVAL AND REMEDIAL ACTIONS
 ACCT:  OMA  OPERATIONS »  MAINT.ARMY
 FORT CARSON
 FORT CARSON                      CO

CO-214020150 PROJECT:  FTCAASBSV
ASBESTOS SURVEY
ACCT: OMA  OPERATIONS t MAINT.ARMY
FORT CARSON
FORT CARSON                      CO

CO-214020150 PROJECT:  FTC089S040
PERCOLATION STUDY BUTTS, AAF
ACCT: OMA OPERATIONS & MAINT.ARMY
FORT CARSON
FORT CARSON                      CO
                                                       50.0  ESDF
       40.0   ESDF
       45.0   ESDF
      500.0   ESDF
     575.0   ESDL
       5.0  ESDP
                           90/09 MEDIUM   SOLID      NOT       NOT
                                         WASTE     AVAIL     AVAIL
                           90/09 MEDIUM   SOLID
                                         WASTE
 NOT       NOT
AVAIL     AVAIL
                           90/09 MEDIUM   SOLID      NOT       NOT
                                         WASTE     AVAIL     AVAIL
                      NOT
                     AVAIL
 NOT
AVAIL
                      NOT
                     AVAIL
                          90/09 MEDIUM   TOXIC    ADEQUATE  ADEQUATE   ADEQUATE
                                       SUBSTANCE   DESIGN    TIMING    ESTIMATE
                          90/09  LOW     TOXIC    ADEQUATE  ADEQUATE   ADEQUATE
                                       SUBSTANCE   DESIGN    TIMING    ESTIMATE
                          90/09  HIGH    WATER      NOT       NOT        NOT
                                                   AVAIL     AVAIL      AVAIL

-------
                                 FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR  1991

                         DEPARTMENT OF ARMY                      US ARMY FORCES COMMAND
                PROJECT IDENTIFICATION
                     REQ    EST   PROJECT
  BUDGET     COMPL   COMPL  COMPL ASSESS- MEDIA
(THOUSANDS)  STATUS  DATE    DATE   MENT    TYPE
                                                                     ARMY-181
  ADEQUACY OF PROJECT
ENGIN-
EERING    TIME      COST
CO-214020150 PROJECT: FTCOB9S047                      190.0  ESDP
DESIGN AND CONSTRUCT NON-DISCHARGING LAGOON
ACCT: OMA OPERATIONS 4 MAINT.ARMY
FORT CARSON
FORT CARSON                      CO

CO-214020150 PROJECT: FTC089S001                       95.0  ESDF
POL PLATFORMS - VARIOUS MOTOR POOLS
ACCT: OMA OPERATIONS & MAINT.ARMY
FORT CARSON
FORT CARSON                      CO

CO-214020150 PROJECT: FTC089S002                      191.0  ESDF
DESIGN AND CONTRUCT HEATED BATTERY STORAGE BLDG
ACCT: OMA OPERATIONS & MAINT.ARMY
FORT CARSON
FORT CARSON                      CO

CO-214020150 PROJECT: CAR 0006                         25.0  ESDF
MERCURY CONTAMINATION INVESTIGATION
ACCT: OMA OPERATIONS t MAINT.ARMY
FORT CARSON
FORT CARSON                      CO

CO-214020150 PROJECT: F135                            900.0  ESDL
VEHICLE MAINTENANCE SHOP ADDITIONS
ACCT: MILCON.ARMY (MCA)
FORT CARSON
FORT CARSON                      CO

CO-214023010 PROJECT: PCNY69S002                      200.0  ESDF
AIR POLLUTION CONTROL AND ABATEMENT (PCMS)
ACCT: OMA OPERATIONS & MAINT.ARMY
PINON CANYON
FORT CARSON                      CO
                           90/09  MEDIUM   WATER
                           90/09 MEDIUM   WATER
                           91/02  MEDIUM   WATER
                           90/09 MEDIUM   WATER
                           90/09   LOW     WATER
                          90/09 MEDIUM    AIR
                                                    NOT
                                                   AVAIL
                                                    NOT
                                                   AVAIL
                                                    NOT
                                                   AVAIL
                                                    NOT
                                                   AVAIL
                                                    NOT
                                                   AVAIL
          NOT
         AVAIL
          NOT
         AVAIL
          NOT
         AVAIL
          NOT
         AVAIL
          NOT
         AVAIL
 NOT
AVAIL
 NOT
AVAIL
 NOT
AVAIL
 NOT
AVAIL
 NOT
AVAIL
                                                  ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE

-------
                                  FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                          DEPARTMENT  OF ARMY                      US ARMY FORCES COMMAND
                 PROJECT IDENTIFICATION
                     REQ     EST   PROJECT
  BUDGET     COMPL    COMPL   COMPL ASSESS- MEDIA
(THOUSANDS)   STATUS   DATE    DATE  MENT    TYPE
                                                                     ARMY-1B3
    ADEQUACY OF PROJECT
  ENGIN-
  EERING    TIME      COST
 CO-214023010 PROJECT:  PCNY89S004
 AIR QUALITY MONITORING (PCMS)
 ACCT:  OMA OPERATIONS  8 MAINT.ARMY
 PINON  CANYON
 FORT CARSON                     CO

 CO-214023010 PROJECT:  PCNY89S001
 CULTURAL  RESOURCE MANAGEMENT (PCMS)
 ACCT:  OMA OPERATIONS  & MAINT.ARMY
 PINON  CANYON
 FORT CARSON                     CO

 CO-214023010  PROJECT:  PCNY89S003
 NOISE  MONITORING (PCMS)
 ACCT:  OMA  OPERATIONS 4  MAINT.ARMY
 PINON  CANYON
 FORT CARSON                      CO

 GA-214020046  PROJECT:  A022B
 LANDFILL MONITORING
 ACCT: OMA  OPERATIONS *  MAINT.ARMY
 FORT GILLEM
 FORT GILLEM                      SA

 GA-214020046  PROJECT: GILL  0005
 REMEDIAL ACTION - CLEANUP OF LUST SITES
 ACCT: DERA - OMA (OPERATIONS AND MA
 FORT GILLEM
 FORT GILLEM                      GA

GA-214020872  PROJECT:  FTST89S004
HAZ WASTE DISPOSAL
ACCT: OMA OPERATIONS S MAINT.ARMY
 FORT STEWART
 FORT STEWART                     GA
                                                       12.0  ESDL
      170.0   OTHR
        7.0   ESDL
                                                                           90/09 MEDIUM
                           90/09  LOW
                          90/09  LOW
                                                                                           AIR
                                        MULTI
                                        MEDIA
                                         NOISE
       50.0   ESDF   80/11  90/09 MEDIUM   CERCLA
      250.0  OTHR   92/10  90/09 MEDIUM
     497.0  ESDP
                          90/09  HIGH
                                         SOLID
                                         WASTE
                                         SOLID
                                         WASTE
                                                    NOT
                                                   AVAIL
  NOT
 AVAIL
                                                    NOT
                                                   AVAIL
            NOT
           AVAIL
 NOT
AVAIL
            NOT
           AVAIL
            NOT
           AVAIL
 NOT
AVAIL
            NOT
           AVAIL
                                                  ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
ADEQUATE  ADEQUATE   ADEQUATE
 DESIGN    TIMING    ESTIMATE
ADEQUATE  ADEQUATE   ADEQUATE
 DESIGN    TIMING    ESTIMATE

-------
                                 FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR  1991

                         DEPARTMENT OF ARMY                      US ARMY FORCES COMMAND
                PROJECT IDENTIFICATION
                     REQ    EST    PROJECT
  BUDGET     COMPL   COMPL   COMPL  ASSESS- MEDIA
(THOUSANDS)   STATUS  DATE    DATE   MENT    TYPE
                                                                     ARMY-183
                            ADEQUACY OF  PROJECT
                          ENGIN-
                          EERING    TIME      COST
GA-214020872 PROJECT: FTST89S003
HAZMIN PROGRAM
ACCT: OMA OPERATIONS t MAINT.ARMY
FORT STEWART
FORT STEWART                     GA

GA-214039595 PROJECT: FOR089S002
FORSCOM ENVIRONMENTAL EMERGENCY REQUIREMENTS
ACCT: OMA OPERATIONS & MAINT.ARMY
HQ ARMY FORCES COMMAND
FT. MCPHERSON                    GA

IL-214020838 PROJECT: F88-071
REMOVE ASBESTOS
ACCT: OMA OPERATIONS & MAINT.ARMY
FORT SHERIDAN
FORT SHERIDAN                    IL

KS-214020756 PROJECT: FRY089S009
CORRECT HIGH RADON LEVELS - OMA BUILDINGS
ACCT: OMA OPERATIONS & MAINT.ARMY
FORT RILEY
JUNCTION CITY                    KS

KS-214020756 PROJECT: FRY089S010
CORRECT HIGH RADON LEVELS - FAMILY HOUSING
ACCT: AFH11920) SERIES (MAINT, REPA
FORT RILEY
JUNCTION CITY                    KS

KS-214020756 PROJECT: FRY089S011
CORRECT HIGH RADON LEVELS - USAR FACILITIES
ACCT: OMARIO&M ARMY RESERVE)
FORT RILEY
JUNCTION CITY                    KS
       75.0  ESDF
    1,900.0   CMPA
       50.0  ESDF
       25.0  ESDF
       25.0  ESDF
        5.0  ESDF
                           90/09  MEDIUM   SOLID
                                         WASTE
90/09  HIGH   MULTI
              MEDIA
                        ADEQUATE  ADEQUATE    ADEQUATE
                         DESIGN    TIMING    ESTIMATE
                                                  ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
                           90/09 MEDIUM   TOXIC    ADEQUATE  ADEQUATE   ADEQUATE
                                       SUBSTANCE   DESIGN    TIMING    ESTIMATE
                           90/11 MEDIUM    AIR     ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
                           90/11 MEDIUM    AIR     ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
                           90/11 MEDIUM    AIR     ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE

-------
                                  FEDERAL  AGENCY  POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                          DEPARTMENT  OF ARMY                      US ARMY FORCES COMMAND
                 PROJECT IDENTIFICATION
                     REQ    EST    PROJECT
  BUDGET     COMPL   COMPL   COMPL  ASSESS- MEDIA
(THOUSANDS)   STATUS  DATE    DATE   MENT    TYPE
                                                                     ARMY-184
  ADEQUACY OF PROJECT
ENGIN-
EERING    TIME      COST
 KS-214020756 PROJECT:  FRY089S012
 DEVELOP EIS-LAND  ACQUISITION
 ACCT:  DMA  OPERATIONS  & MAINT.ARMY
 FORT RILEY
 JUNCTION CITY                   KS

 KS-214020756 PROJECT:  FRY089S015
 DEVELOP NATURAL RESOURCES MANAGEMENT PLAN
 ACCT:  DMA  OPERATIONS  & MAINT.ARMY
 FORT RILEY
 JUNCTION CITY                   KS

 K5-214020756  PROJECT:  FRY089S018
 IMPLEMENT  FORSCOM HISTORIC PRESERVATION PROS
 ACCT:  DMA  OPERATIONS  & MAINT.ARMY
 FORT RILEY
 JUNCTION CITY                    KS

 KS-214020756  PROJECT: FRY089S016
 DEVELOP  PEST  MANAGEMENT PLAN
 ACCT: DMA OPERATIONS & MAINT.ARMY
 FORT RILEY
 JUNCTION CITY                    KS

 KS-214020756  PROJECT: FR11870501
 CLEANUP FORMER DRY CLEANING PLANT SITE
ACCT: DERA - DMA (OPERATIONS AND MA
 FORT RILEY
JUNCTION CITY                    KS

KS-214020756 PROJECT: FR14870501
CLEANUP-PESTICIDE STORAGE AND HANDLING BLDS.
ACCT: DERA - DMA (OPERATIONS AND MA
 FORT RILEY
JUNCTION CITY                    KS
                                                      110.0  ESDF
       60.0   ESDF
                           90/09  HIGH   MULTI     ADEQUATE  ADEQUATE   ADEQUATE
                                        MEDIA      DESIGN    TIMING    ESTIMATE
                           90/12   LOW    MULTI     ADEQUATE  ADEQUATE   ADEQUATE
                                        MEDIA      DESIGN    TIMING    ESTIMATE
       35.0   ESDF    92/09   90/09  HIGH   MULTI     ADEQUATE  ADEQUATE   ADEQUATE
                                        MEDIA      DESIGN    TIMING    ESTIMATE
       40.0   ESDF
       77.0   ESDL
       77.0   ESDL
                           90/12 MEDIUM PESTICIDES ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
                          90/09  HIGH    CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
                          90/09  HIGH    CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE

-------
                                 FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                         DEPARTMENT OF ARMY                      US ARMY FORCES COMMAND
                PROJECT IDENTIFICATION
                     REQ    EST   PROJECT
  BUDGET     COMPL   COMPL  COMPL  ASSESS- MEDIA
(THOUSANDS)   STATUS  DATE   DATE   MENT    TYPE
                                                                     ARMY-185
    ADEQUACY OF PROJECT
  ENGIN-
  EERING    TIME      COST
KS-214020756 PROJECT: FR17870501
CHARACTERIZE/ANALYZE HAZARDOUS WASTES
ACCT: DMA OPERATIONS & MAINT.ARMY
FORT RILEY
JUNCTION CITY                    KS

KS-214020756 PROJECT: FR25870501
DISPOSE OF INSTALLATION'S HAZARDOUS WASTES
ACCT: DMA OPERATIONS & MAINT.ARMY
FORT RILEY
JUNCTION CITY                    KS

KS-214020756 PROJECT: FR06870501
CONDUCT SOUNDNESS TESTING-UNDERGROUND TANKS
ACCT: OMA OPERATIONS i MAINT.ARMY
FORT RILEY
JUNCTION CITY                    KS

KS-214020756 PROJECT: FR34881227
GROUNDKATER MONITORING WELLS SAN LDFL
ACCT: OMA OPERATIONS ft MAINT.ARMY
FORT RILEY
JUNCTION CITY                    KS

KS-214020756 PROJECT: FR41881227
INSTALL SAN LDFL LINER/LEACHATE COLLECTION
ACCT: OMA OPERATIONS & MAINT.ARMY
FORT RILEY
JUNCTION CITY                    KS

KS-214020756 PROJECT: FR29871120
DEVELOP NEW CONSTRUCTION/DEMOLITION LANDFILL
ACCT: OMA OPERATIONS & MAINT.ARMY
FORT RILEY
JUNCTION CITY                    KS
       13.0  INOV
      125.0  ESDP
       50.0  ESDP
                           90/09  HIGH
                           90/09  HIGH
       50.0   ESRO
                                         SOLID
                                         WASTE
                                         SOLID
                                         WASTE
ADEQUATE  ADEQUATE   ADEQUATE
 DESIGN    TIMING    ESTIMATE
                           90/09  HIGH    SOLID
                                         WASTE
       50.0  PSDF   92/12   91/06  HIGH    SOLID
                                         WASTE
      400.0  PSDF    92/12   91/06  HIGH    SOLID
                                         WASTE
                           90/09 MEDIUM   SOLID
                                         WASTE
  NOT
 AVAIL
 NOT
AVAIL
  NOT
 AVAIL
  NOT
 AVAIL
  NOT
 AVAIL
 NOT
AVAIL
 NOT
AVAIL
 NOT
AVAIL
 NOT
AVAIL
ADEQUATE  ADEQUATE   ADEQUATE
 DESIGN    TIMING    ESTIMATE
 NOT
AVAIL
 NOT
AVAIL
 NOT
AVAIL

-------
                                  FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR  1991

                          DEPARTMENT OF ARMY                      US ARMY FORCES COMMAND
                 PROJECT IDENTIFICATION
                     REQ    EST   PROJECT
  BUDGET     COMPL    COMPL  COMPL ASSESS- MEDIA
(THOUSANDS)   STATUS   DATE   DATE  MENT    TYPE
                                                                                                                     ARMY-186
    ADEQUACY OF PROJECT
  ENGIN-
  EERING    TIME      COST
 KS-214020756 PROJECT:  FR22870501
 ABATE  INSTALLATION  ASBESTOS
 ACCT:  OMA  OPERATIONS & MAINT,ARMY
 FORT RILEY
 JUNCTION CITY                    KS

 KS-214020756 PROJECT: FRY089S013
 CONSTRUCT  SOIL EROSION CONTROL STRUCTURES
 ACCT:  OMA  OPERATIONS S MAINT,ARMY
 FORT RILEY
 JUNCTION CITY                    KS

 KS-214020756 PROJECT: FR20870501
 REPAIR CUSTER HILL WWTP
 ACCT: OMA  OPERATIONS t MAINT,ARMY
 FORT RILEY
 JUNCTION CITY                    KS

 KS-214020756 PROJECT: FRY089S004
 SURVEY/REPAIR VEHICLE MAINT AREA WASHRACKS
 ACCT: OMA OPERATIONS t MAINT,ARMY
 FORT RILEY
 JUNCTION CITY                    KS

 KS-214020756 PROJECT: FRY089S001
 DESIGN/CONSTRUCT SEDIMENTATION TRAPS
 ACCT: OMA OPERATIONS t MAINT,ARMY
 FORT RILEY
JUNCTION CITY                    KS

KY-214020140 PROJECT: 9-3-88X
JP4 CONTAMINATION CAAF
ACCT: DERA - OMA (OPERATIONS AND MA
 FORT CAMPBELL
 FORT CAMPBELL                    KY
                                                      500.0  ESDF
                          90/09  LOW     TOXIC
                                       SUBSTANCE
ADEQUATE  ADEQUATE   ADEQUATE
 DESIGN    TIMING    ESTIMATE
        9.0   ESDF    95/01  90/09 MEDIUM   WATER
      945.0   ESRO
      200.0   ESRO
      40.0   ESDL
      298.0  ESDP
                          90/09 MEDIUM   WATER
                          90/09  LOW     WATER
                          90/09  LOW     WATER
                          90/09  HIGH    CERCLA
                                                    NOT
                                                   AVAIL
            NOT
           AVAIL
                                                    NOT
                                                   AVAIL
                                                    NOT
                                                   AVAIL
            NOT
           AVAIL
            NOT
           AVAIL
 NOT
AVAIL
                                                  ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
 NOT
AVAIL
 NOT
AVAIL
                                                  ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE

-------
                                 FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR  FISCAL YEAR  1991

                         DEPARTMENT OF ARMY                      US ARMY FORCES  COMMAND
                PROJECT IDENTIFICATION
                     REQ    EST    PROJECT
  BUDGET     COMPL   COMPL  COMPL  ASSESS- MEDIA
(THOUSANDS)   STATUS  DATE   DATE   MENT    TYPE
                                                                                                                     ARMY-187
             ADEQUACY OF PROJECT
           ENGIN-
           EERING    TIME      COST
KY-214020140 PROJECT: 8-7-88X
ANNUAL UST PERMIT FEES (TN)
ACCT: DMA OPERATIONS & MAINT.ARMY
FORT CAMPBELL
FORT CAMPBELL                    KY

KY-214020140 PROJECT: 11-2-87X
WASTE MINIMUMIZATION-SOLVENT RECYCLING
ACCT: OMA OPERATIONS & MAINT.ARMY
FORT CAMPBELL
FORT CAMPBELL                    KY

KY-214020140 PROJECT: FTCA89S005
HAZ WASTE CLEAN UP REQUIREMENTS CONTRACT
ACCT: OMA OPERATIONS & MAINT.ARMY
FORT CAMPBELL
FORT CAMPBELL                    KY

KY-214020140 PROJECT: 5-1-87X
DISPOSAL OF HAZARDOUS WASTE
ACCT: OMA OPERATIONS & MAINT.ARMY
FORT CAMPBELL
FORT CAMPBELL                    KY

KY-214020140 PROJECT: 5-2-87X
REQUIREMENTS CONTRACT FOR CHEMICAL ANALYSIS
ACCT: OMA OPERATIONS & MAINT.ARMY
FORT CAMPBELL
FORT CAMPBELL                    KY

KY-214020140 PROJECT: 5-6-88X
TSDF ANNUAL PERMIT FEES
ACCT: OMA OPERATIONS & MAINT.ARMY
FORT CAMPBELL
FORT CAMPBELL                    KY
       10.0  ESDP   89/06   90/09   HIGH
      100.0   ESDP   87/10   90/09  HIGH
       25.0  ESDP
      400.0  ESDP
       90.0  ESDP
       10.0  ESDP
                           90/09  HIGH
                           90/09  HIGH
SOLID    ADEQUATE  ADEQUATE   ADEQUATE
WASTE     DESIGN    TIMING    ESTIMATE
                                         SOLID    ADEQUATE  ADEQUATE   ADEQUATE
                                         WASTE     DESIGN    TIMING    ESTIMATE
                           90/09  HIGH    SOLID
                                         WASTE
                           90/09  HIGH    SOLID
                                         WASTE
         ADEQUATE  ADEQUATE    ADEQUATE
          DESIGN    TIMING     ESTIMATE
         ADEQUATE  ADEQUATE   ADEQUATE
          DESIGN    TIMING    ESTIMATE
                                         SOLID    ADEQUATE  ADEQUATE   ADEQUATE
                                         WASTE     DESIGN    TIMING    ESTIMATE
                                         SOLID    ADEQUATE  ADEQUATE   ADEQUATE
                                         WASTE     DESIGN    TIMING    ESTIMATE

-------
                                  FEDERAL  AGENCY  POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                          DEPARTMENT  OF ARMY                      US ARMY FORCES COMMAND
                 PROJECT IDENTIFICATION
                     REQ    EST    PROJECT
  BUDGET     COMPL   COMPL   COMPL  ASSESS- MEDIA
(THOUSANDS)   STATUS   DATE    DATE   MENT    TYPE
                                                                     ARMY-188
  ADEQUACY OF PROJECT
ENGIN-
EERING    TIME      COST
 KY-214020140 PROJECT:  8-10-88X
 UPGRADE TO REGULATORY  STANDARDS  (UST)
 ACCT:  DMA OPERATIONS g MAINT.ARMY
 FORT CAMPBELL
 FORT CAMPBELL                   KY

 KY-214020140 PROJECT:  8-5-88X
 CLOSURE (TANK SITES)
 ACCT:  DMA OPERATIONS & MAINT.ARMY
 FORT CAMPBELL
 FORT CAMPBELL                   KY

 KY-214020140  PROJECT:  8-8-8SX
 REPAIR  4  RETEST (UST)
 ACCT: DMA OPERATIONS t MAINT.ARMY
 FORT CAMPBELL
 FORT CAMPBELL                    KY

 KY-214020140  PROJECT:  8-9-86X
 TANK REPLACEMENT
 ACCT: OMA  OPERATIONS &  MAINT.ARMY
 FORT CAMPBELL
 FORT CAMPBELL                    KY

 KY-214020140 PROJECT:  FTCA89S008
 REQUIREMENTS CONTRACT ASBESTOS REMOVAL)
 ACCT: OMA  OPERATIONS i  MAINT.ARMY
 FORT CAMPBELL
 FORT CAMPBELL                    KY

 LA-214020716 PROJECT:  FTP089S001
REMOVE FRIABLE ASBESTOS AT USAR CENTER
ACCT: OMARtO&M ARMY RESERVE)
 FORT POLK
 LEESVILLE                        LA
      184.0   ESDF
      211.0   ESDF
       29.0   ESDF
      120.0   ESDF
      200.0  ESDF
      100.0  ESDF
                           90/09 MEDIUM   SOLID    ADEQUATE  ADEQUATE   ADEQUATE
                                         WASTE     DESIGN    TIMING    ESTIMATE
                           90/09 MEDIUM   SOLID    ADEQUATE  ADEQUATE   ADEQUATE
                                         WASTE     DESIGN    TIMING    ESTIMATE
                          90/09 MEDIUM   SOLID    ADEQUATE  ADEQUATE   ADEQUATE
                                         WASTE     DESIGN    TIMING    ESTIMATE
                          90/09 MEDIUM   SOLID    ADEQUATE  ADEQUATE   ADEQUATE
                                         WASTE     DESIGN    TIMING    ESTIMATE
                          90/09  LOW     TOXIC    ADEQUATE  ADEQUATE   ADEQUATE
                                       SUBSTANCE   DESIGN    TIMING    ESTIMATE
                          90/09 MEDIUM    AIR     ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE

-------
                                  FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                         DEPARTMENT OF ARMY                      US ARMY FORCES COMMAND
                PROJECT IDENTIFICATION
                     REQ    EST   PROJECT
  BUDGET     COMPL   COMPL  COMPL ASSESS- MEDIA
(THOUSANDS)  STATUS  DATE   DATE  MENT    TYPE
                                                                     ARMY-189
                            ADEQUACY OF PROJECT
                          ENGIN-
                          EERING    TIME      COST
LA-214020716 PROJECT: F1003
REMOVE FRIABLE ASBESTOS
ACCT: DMA OPERATIONS & MAINT.ARMY
FORT POLK
LEESVILLE                        LA

LA-214020716 PROJECT: POLK 0006
ARCHAEOLOGY INVESTIGATIONS
ACCT: OMA OPERATIONS i MAINT.ARMY
FORT POLK
LEESVILLE                        LA

LA-214020716 PROJECT: POLK 0002
MONITOR ENDANGERED SPECIES/HABITAT IMPROVE
ACCT: OMA OPERATIONS & MAINT.ARMY
FORT POLK
LEESVILLE                        LA

LA-214020716 PROJECT: POLK 0003
CONTAMINATED MOGAS SITE K AVENUE
ACCT: DERA - OMA (OPERATIONS AND MA
FORT POLK
LEESVILLE                        LA

LA-214020716 PROJECT: FTP-F1007B
FORT POLK DERA PROJECTS - (FOUR SITES) - REMEDY
ACCT: DERA - OMA (OPERATIONS AND MA
FORT POLK
LEESVILLE                        LA

LA-21-+020716 PROJECT: FTP089S014
HAZMIN PROJECT-D: CONST ACCUMTN STRS USAR CNS
ACCT: OMARIO&M ARMY RESERVE)
FORT POLK
LEESVILLE                        LA
      500.0  ESDF
                           90/09 MEDIUM    AIR
      125.0  ESDP   91/10  90/09  HIGH    HIST/
                                         ARCH
                                                   ADEQUATE  ADEQUATE   ADEQUATE
                                                    DESIGN    TIMING    ESTIMATE
                        ADEQUATE  ADEQUATE   ADEQUATE
                         DESIGN    TIMING    ESTIMATE
       10.0  ESDP   91/10  90/09  HIGH    MULTI     ADEQUATE  ADEQUATE   ADEQUATE
                                         MEDIA      DESIGN    TIMING    ESTIMATE
      100.0  ESDP   91/10  90/09  HIGH    CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
    1,000.0  ESDP
90/09  HIGH
       75.0  ESDP   90/02   90/09  HIGH
                                         CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
                                         SOLID    ADEQUATE  ADEQUATE   ADEQUATE
                                         WASTE     DESIGN    TIMING    ESTIMATE

-------
                                  FEDERAL AGENCY  POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                          DEPARTMENT OF  ARMY                      US ARMY FORCES COMMAND
                 PROJECT IDENTIFICATION
                     REQ    EST    PROJECT
  BUDGET     COMPL   COMPL  COMPL  ASSESS- MEDIA
(THOUSANDS)   STATUS  DATE    DATE   MENT    TYPE
                                                                                                                      ARMY-190
    ADEQUACY OF PROJECT
  ENGIN-
  EERING    TIME      COST
 LA-214020716 PROJECT:  FTP089S008
 HAZMIN PROJECT-B:  CONSTRUCT  HW  ACCUMULATION STR
 ACCT:  DMA OPERATIONS  & MAINT.ARMY
 FORT POLK
 LEESVILLE                       LA

 LA-214020716 PROJECT:  FTP089S005
 CONDUCT UST  PROGRAM FOR FORT POLK
 ACCT:  DMA OPERATIONS & MAINT.ARMY
 FORT POLK
 LEESVILLE                       LA

 LA-214020716  PROJECT:  F1006
 UPGRADE FIREFIGHTER TRAINING AREA
 ACCT:  DMA OPERATIONS i. MAINT.ARMY
 FORT POLK
 LEESVILLE                        LA

 LA-214020716  PROJECT:  POLK 0005
UST TESTING/CLEANUP POST-WIDE
ACCT: DMA OPERATIONS & MAINT.ARMY
FORT POLK
 LEESVILLE                        LA

 LA-214020716  PROJECT:  F1007B
OLD MILL  CREEK LANDFILLS
ACCT: DERA -  OMA (OPERATIONS AND MA
FORT POLK
LEESVILLE                        LA

LA-214020716  PROJECT:  FTPOS9S006
HAZARDOUS WASTE DISPOSAL ANNUAL COSTS
ACCT: OMA OPERATIONS & MAINT.ARMY
FORT POLK
LEESVILLE                        LA
      300.0   ESDP   92/02   90/09  HIGH    SOLID
                                         WASTE
       80.0   ESDF    93/12   90/09  HIGH     SOLID
                                          WASTE
      200.0   ESDF
                           90/09 MEDIUM   SOLID
                                         WASTE
      150.0   ESDF    89/12   90/09 MEDIUM   SOLID
                                         WASTE
       20.0   ESDF
       50.0   OTHR
                           90/09 MEDIUM   SOLID
                                         WASTE
                          90/09   LOW     SOLID
                                         WASTE
ADEQUATE  ADEQUATE   ADEQUATE
 DESIGN    TIMING    ESTIMATE
ADEQUATE  ADEQUATE   ADEQUATE
 DESIGN    TIMING    ESTIMATE
ADEQUATE  ADEQUATE   ADEQUATE
 DESIGN    TIMING    ESTIMATE
ADEQUATE  ADEQUATE   ADEQUATE
 DESIGN    TIMING    ESTIMATE
ADEQUATE  ADEQUATE   ADEQUATE
 DESIGN    TIMING    ESTIMATE
ADEQUATE  ADEQUATE   ADEQUATE
 DESIGN    TIMING    ESTIMATE

-------
                                 FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR  1991

                         DEPARTMENT OF ARMY                      US ARMY FORCES COMMAND
                PROJECT IDENTIFICATION
                     REQ    EST    PROJECT
  BUDGET     COMPL   COMPL  COMPL  ASSESS- MEDIA
(THOUSANDS)   STATUS  DATE    DATE   MENT    TYPE
                                                                                                                     ARMY-191
   ADEQUACY OF PROJECT
 ENGIN-
 EERING    TIME      COST
LA-214020716 PROJECT: FTP089S016
CONTROL AND MITIGATE EROSION IN TNG/MANEUVER
ACCT: DMA OPERATIONS t MAINT.ARMY
FORT POLK
LEESVILLE                        LA

MA-214020270 PROJECT: FTDE-88-01
RADON MITIGATION-PRIORITY I BUILDINGS
ACCT: OMA OPERATIONS & MAINT.ARMY
HEADQUARTERS FORT DEVENS
FORT DEVENS                      MA

MA-214020270 PROJECT: FTDE89S053
EMO APR/OPERATIONAL EXPENSES
ACCT: OMA OPERATIONS ft MAINT.ARMY
HEADQUARTERS FORT DEVENS
FORT DEVENS                      MA

MA-214020270 PROJECT: FTDE89S052
REGULATORY REQUIRED TRAINING
ACCT: OMA OPERATIONS ft MAINT.ARMY
HEADQUARTERS FORT DEVENS
FORT DEVENS                      MA

MA-214020270 PROJECT: FTDE89S046
BASELINE ENVIRONMENTAL SURVEYS - DEVENS PROJECT
ACCT: OMA OPERATIONS t MAINT.ARMY
HEADQUARTERS FORT DEVENS
FORT DEVENS                      MA

MA-214020270 PROJECT: FTDE-88-13
NEPA COMPLIANCE DOCUMENTATION - FORT DEVENS
ACCT: OMA OPERATIONS * MAINT.ARMY
HEADQUARTERS FORT DEVENS
FORT DEVENS                      MA
      200.0   OTHR
       50.0   PSDF
                           90/09   LOW     WATER
                           90/09 MEDIUM    AIR
                                                  ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
      100.0   ESDP    90/10   90/09  HIGH   MULTI
                                        MEDIA
       50.0   ESDP   89/10   90/09  HIGH   MULTI
                                        MEDIA
       50.0   ESRE    90/09  90/09  LOW    MULTI
                                        MEDIA
       50.0   ESDL
                          90/09 MEDIUM  MULTI
                                        MEDIA
                                                    NOT
                                                   AVAIL
 NOT
AVAIL
 NOT
AVAIL
 NOT
AVAIL
 NOT
AVAIL
           NOT
          AVAIL
 NOT
AVAIL
 NOT
AVAIL
 NOT
AVAIL
 NOT
AVAIL
            NOT
           AVAIL
 NOT
AVAIL
 NOT
AVAIL
 NOT
AVAIL
 NOT
AVAIL

-------
                                  FEDERAL  AGENCY  POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                          DEPARTMENT  OF ARMY                      US ARMY FORCES COMMAND
                 PROJECT IDENTIFICATION
                     REQ     EST   PROJECT
  BUDGET     COMPL    COMPL   COMPL ASSESS- MEDIA
(THOUSANDS)   STATUS   DATE    DATE  MENT    TYPE
                                                                     ARMY-192
                            ADEQUACY  OF  PROJECT
                          ENGIN-
                          EERING    TIME      COST
 MA-214020270 PROJECT:  FTDE-88-14
 NEPA COMPLIANCE  DOCUMENTATION CENTERS
 ACCT:  OMARIO&M ARMY  RESERVE)
 HEADQUARTERS FORT  DEVENS
 FORT DEVENS                     MA

 MA-214020270 PROJECT:  F88-004
 COLD SPRINGS BROOK SWMU * 40 IRA
 ACCT:  DERA  - DMA (OPERATIONS AND MA
 HEADQUARTERS FORT  DEVENS
 FORT DEVENS                     MA

 MA-214020270 PROJECT:  F88-012
 FORT DEVENS LUST REMEDIATION
 ACCT:  DERA  -  DMA (OPERATIONS AND MA
 HEADQUARTERS FORT  DEVENS
 FORT DEVENS                     MA

 MA-214020270  PROJECT:  F88-014
 USARC  LUST  REMEDIATION
 ACCT:  DERA  -  OMA (OPERATIONS AND MA
 HEADQUARTERS  FORT  DEVENS
 FORT DEVENS                      MA

 MA-214020270  PROJECT: F88-017
 CONDUCT CERCLA ASSESSMENT
 ACCT: DERA  -  OMA (OPERATIONS AND MA
 HEADQUARTERS  FORT DEVENS
 FORT DEVENS                      MA

MA-214020270  PROJECT: F88-005
 LANDFILL/SWMU 85 GH MONITORING
ACCT: OMA OPERATIONS & MAINT.ARMY
HEADQUARTERS  FORT DEVENS
 FORT DEVENS                      MA
      125.0   ESDL
      150.0   ESDP
    1,500.0   ESDP
    1,000.0  ESDP
      50.0  ESDL
      50.0  CMPA
                          90/09 MEDIUM  MULTI
                                        MEDIA
                          NOT
                         AVAIL
 NOT
AVAIL
                          90/09  HIGH    CERCLA     NOT       NOT
                                                   AVAIL     AVAIL
90/09  HIGH    CERCLA     NOT      NOT
                         AVAIL      AVAIL
90/09  HIGH    CERCLA     NOT       NOT
                         AVAIL      AVAIL
                          90/09 MEDIUM   CERCLA
                          90/09  HIGH
                                         SOLID
                                         WASTE
                                                    NOT
                                                   AVAIL
                          NOT
                        AVAIL
                                   NOT
                                  AVAIL
 NOT
AVAIL
 NOT
AVAIL
                                              NOT
                                             AVAIL
                                                                         NOT
                                                                        AVAIL
                                                                         NOT
                                                                        AVAIL
            NOT
           AVAIL
 NOT
AVAIL

-------
                                 FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR  1991

                         DEPARTMENT OF ARMY                      US ARMY FORCES COMMAND
                PROJECT IDENTIFICATION
                     REQ    EST    PROJECT
  BUDGET     COMPL   COMPL  COMPL  ASSESS- MEDIA
(THOUSANDS)   STATUS  DATE    DATE   MENT    TYPE
                                                                     ARMY-193
   ADEQUACY OF PROJECT
 ENGIN-
 EERING    TIME      COST
MA-214020270 PROJECT: A056A
LANDFILL CLOSURE PROJECTS
ACCT: OMA OPERATIONS t MAINT.ARMY
HEADQUARTERS FORT DEVENS
FORT DEVENS                      MA

MA-214020270 PROJECT: FTDE89S002
HAZARDOUS WASTE DISPOSAL - USAR
ACCT: OMARIO&M ARMY RESERVE)
HEADQUARTERS FORT DEVENS
FORT DEVENS                      MA

MA-214020270 PROJECT: FTDE89S003
HW LAB ANALYSIS COSTS
ACCT: OMA OPERATIONS t MAINT.ARMY
HEADQUARTERS FORT DEVENS
FORT DEVENS                      MA

MA-214020270 PROJECT: FTDE89S027
REMOVE ABANDONED UST - DEVENS
ACCT: OMA OPERATIONS t MAINT.ARMY
HEADQUARTERS FORT DEVENS
FORT DEVENS                      MA

MA-214020270 PROJECT: FTDE89S005
PA/SI - RI/FS
ACCT: DERA - OMA (OPERATIONS AND MA
HEADQUARTERS FORT DEVENS
FORT DEVENS                      MA

MA-214020270 PROJECT: FTDE89S054
UST TESTING - DEVENS
ACCT: OMA OPERATIONS * MAINT.ARMY
HEADQUARTERS FORT DEVENS
FORT DEVENS                      MA
      600.0  CMPA   69/06   90/09   HIGH
       50.0  ESDP
       30.0  ESDP
                           90/09  HIGH
    1,000.0   ESDP   96/12   90/09  HIGH
       50.0   ESDP   89/12   90/09  HIGH
                                         SOLID
                                         WASTE
                                         SOLID
                                         WASTE
                           90/09  HIGH    SOLID
                                         WASTE
      250.0  ESDP   88/01   90/09  HIGH    SOLID
                                         WASTE
                                         SOLID
                                         WASTE
                                         SOLID
                                         WASTE
 NOT
AVAIL
 NOT
AVAIL
 NOT
AVAIL
 NOT
AVAIL
 NOT
AVAIL
 NOT
AVAIL
 NOT
AVAIL
 NOT
AVAIL
 NOT
AVAIL
 NOT
AVAIL
 NOT
AVAIL
 NOT
AVAIL
 NOT
AVAIL
 NOT
AVAIL
 NOT
AVAIL
 NOT
AVAIL
 NOT
AVAIL
 NOT
AVAIL

-------
                                  FEDERAL  AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                          DEPARTMENT  OF ARMY                      US ARMY FORCES COMMAND
                 PROJECT IDENTIFICATION
                     REQ     EST   PROJECT
  BUDGET     COMPL   COMPL   COMPL ASSESS- MEDIA
(THOUSANDS)   STATUS   DATE    DATE  MENT    TYPE
                                                                                                                      ARMY-194
   ADEQUACY OF PROJECT
 ENGIN-
 EERING    TIME      COST
 MA-214020270 PROJECT:  FTDE89S051
 UST TESTING USAR  CENTERS
 ACCT:  OMAR(0£M ARMY  RESERVE)
 HEADQUARTERS FORT DEVENS
 FORT DEVENS                     MA

 MA-214020270 PROJECT:  FTDE89S042
 HAZARDOUS  HASTE MANAGEMENT - USAR
 ACCT:  OMARCOSM ARMY  RESERVE)
 HEADQUARTERS FORT DEVENS
 FORT DEVENS                      MA

 MA-214020270  PROJECT:  FTDE89S028
 UNDERGROUND  STORAGE  TANK REMOVAL - FORT DEVENS
 ACCT: DMA OPERATIONS & MAINT.ARMY
 HEADQUARTERS  FORT  DEVENS
 FORT DEVENS                      MA

 MA-214020270  PROJECT: F88-020
 HAZMIN PROGRAM DEVELOPMENT
 ACCT: OMA OPERATIONS & MAINT.ARMY
 HEADQUARTERS  FORT DEVENS
 FORT DEVENS                      MA

 MA-214020270  PROJECT: FTDE89S030
 UST REMOVAL/REPLACEMENT - USAR
 ACCT: OMARIO&M ARMY RESERVE)
HEADQUARTERS  FORT DEVENS
 FORT DEVENS                      MA

MA-21-+020270  PROJECT: FTDE89S039
CONTAMINATED  SOILD TSD FACILITY
ACCT: DERA - OMA  (OPERATIONS AND MA
HEADQUARTERS  FORT DEVENS
 FORT DEVENS                      MA
       30.0   ESDP    89/09   90/09  HIGH    SOLID
                                         WASTE
       50.0   ESDP   89/10  90/09  HIGH    SOLID
                                         WASTE
      500.0   ESDP   90/12  90/09  HIGH
      50.0  ESDP
                          90/09  HIGH
                                         SOLID
                                         WASTE
                                         SOLID
                                         WASTE
     250.0  ESDF   90/12  90/09 MEDIUM   SOLID
                                         WASTE
      100.0  ESDF   89/10  90/09 MEDIUM   SOLID
                                         WASTE
 NOT
AVAIL
 NOT
AVAIL
 NOT
AVAIL
 NOT
AVAIL
 NOT
AVAIL
 NOT
AVAIL
 NOT
AVAIL
 NOT
AVAIL
 NOT
AVAIL
 NOT
AVAIL
 NOT
AVAIL
 NOT
AVAIL
 NOT
AVAIL
 NOT
AVAIL
 NOT
AVAIL
 NOT
AVAIL
 NOT
AVAIL
 NOT
AVAIL

-------
                                 FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR  FISCAL YEAR 1991

                         DEPARTMENT OF ARMY                      US ARMY FORCES COMMAND
                PROJECT IDENTIFICATION
                     REQ    EST    PROJECT
  BUDGET     COMPL   COMPL   COMPL  ASSESS- MEDIA
(THOUSANDS)   STATUS  DATE    DATE   MENT    TYPE
                                                                     ARMY-195
                            ADEQUACY  OF  PROJECT
                          ENGIN-
                          EERING    TIME     COST
MA-214020270 PROJECT: F88-013
UST-MANAGEMENT - FT DEVENS
ACCT: DMA OPERATIONS & MAINT.ARMY
HEADQUARTERS FORT DEVENS
FORT DEVENS                      MA

MA-214020270 PROJECT: F88-021
EXPAND USE PROGRAM
ACCT: DMA OPERATIONS 4 MAINT.ARMY
HEADQUARTERS FORT DEVENS
FORT DEVENS                      MA

MA-214020270 PROJECT: FTDE-88-08
PCB TRANSFORMER SURVEY, TESTING & REPLACMENT
ACCT: OMAR(0&M ARMY RESERVE)
HEADQUARTERS FORT DEVENS
FORT DEVENS                      MA

MA-214020270 PROJECT: FTDE-88-04
ASBESTOS ABATEMENT-FORT DEVENS
ACCT: OMA OPERATIONS & MAINT.ARMY
HEADQUARTERS FORT DEVENS
FORT DEVENS                      MA

MA-214020270 PROJECT: FTDE-88-06
ASBESTOS ABATEMENT-USAR CENTERS
ACCT: OMAR(04M ARMY RESERVE)
HEADQUARTERS FORT DEVENS
FORT DEVENS                      MA

MA-214020270 PROJECT: FTDE89S026
ASBESTOS SAMPLING AND ANALYSIS CONTRACT
ACCT: OMA OPERATIONS 4 MAINT.ARMY
HEADQUARTERS FORT DEVENS
FORT DEVENS                      MA
       50.0  ESDL
       25.0   ESDL
      100.0  ESDF
      250.0  PSDF
      250.0  PSDF
       25.0  PSDF
                           90/09 MEDIUM   SOLID      NOT       NOT        NOT
                                         WASTE     AVAIL     AVAIL      AVAIL
                           90/09   LOW     SOLID      NOT       NOT        NOT
                                         WASTE     AVAIL     AVAIL      AVAIL
90/09 MEDIUM   TOXIC       NOT       NOT        NOT
             SUBSTANCE   AVAIL     AVAIL      AVAIL
                          90/09 MEDIUM   TOXIC      NOT       NOT        NOT
                                       SUBSTANCE   AVAIL     AVAIL      AVAIL
                          90/09 MEDIUM   TOXIC      NOT       NOT        NOT
                                       SUBSTANCE   AVAIL     AVAIL      AVAIL
                          90/09 MEDIUM   TOXIC      NOT       NOT        NOT
                                       SUBSTANCE   AVAIL     AVAIL      AVAIL

-------
                                  FEDERAL ASENCY  POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                          DEPARTMENT OF ARMY                     US ARMY FORCES COMMAND
                 PROJECT IDENTIFICATION
                     REQ     EST   PROJECT
  BUDGET     COMPL   COMPL   COMPL ASSESS- MEDIA
(THOUSANDS)   STATUS   DATE    DATE  MENT    TYPE
                                                                     ARMY-196
   ADEQUACY OF PROJECT
 ENGIN-
 EERING    TIME      COST
 MA-214020270 PROJECT:  FTDE-88-05
 ASBESTOS 0 & M PLAN AND  SURVEY  RESERVE CENTERS
 ACCT:  OMAR(0&M ARMY RESERVE)
 HEADQUARTERS FORT DEVENS
 FORT DEVENS                     MA

 MA-214020270 PROJECT:  FTDE89S007
 CONDUCT WWTP GROUNDWATER MONITORING
 ACCT:  OMA  OPERATIONS & MAINT.ARMY
 HEADQUARTERS FORT  DEVENS
 FORT DEVENS                     MA

 MA-214020270  PROJECT: F88-009
 WWTP SLUDGE  BED REPAIRS
 ACCT:  OMA  OPERATIONS S, MAINT.ARMY
 HEADQUARTERS  FORT  DEVENS
 FORT DEVENS                      MA

 MA-214020270  PROJECT: FIDO
 OIL  SPILL  PREVENTION PROJECTS
 ACCT: OMA  OPERATIONS & MAINT.ARMY
 HEADQUARTERS  FORT DEVENS
 FORT DEVENS                      MA

 MA-214020270  PROJECT: FTDE89S004
 SPILL PREVENTION - TRAINING AREAS
 ACCT: OMA  OPERATIONS & MAINT,ARMY
 HEADQUARTERS  FORT DEVENS
 FORT DEVENS                      MA

 MA-214020270  PROJECT: FTDE89S001
COLD SPRING BROOK GW MONITORING
ACCT: OMA OPERATIONS & MAINT.ARMY
HEADQUARTERS  FORT DEVENS
FORT DEVENS                      MA
       50.0   ESDL
       20.0   INOV
      50.0  INOV
                           90/09 MEDIUM   TOXIC
                                       SUBSTANCE
                          90/09  HIGH    WATER
                          90/09  HIGH    WATER
      100.0  ESDP   77/07  90/09  HIGH    WATER
      50.0  ESDP   96/12  90/09  HIGH    WATER
      15.0  ESDP   90/12  90/09  HIGH    WATER
 NOT
AVAIL
                                                    NOT
                                                   AVAIL
                                                    NOT
                                                   AVAIL
                                                    NOT
                                                   AVAIL
                                                    NOT
                                                   AVAIL
                                                    NOT
                                                   AVAIL
 NOT
AVAIL
           NOT
          AVAIL
           NOT
          AVAIL
           NOT
          AVAIL
           NOT
          AVAIL
           NOT
          AVAIL
 NOT
AVAIL
            NOT
           AVAIL
            NOT
           AVAIL
            NOT
           AVAIL
            NOT
           AVAIL
            NOT
           AVAIL

-------
                                 FEDERAL ASENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                         DEPARTMENT OF ARMY                      US ARMY FORCES COMMAND
                PROJECT IDENTIFICATION
                     REQ    EST   PROJECT
  BUDGET     COMPL   COMPL  COMPL ASSESS- MEDIA
(THOUSANDS)  STATUS  DATE   DATE   MENT    TYPE
                                                                     ARMY-197
                            ADEQUACY OF  PROJECT
                          ENGIN-
                          EERING    TIME      COST
MA-214020270 PROJECT: FTDE-88-11
SPILL PREVENTION USAR CENTERS
ACCT: OMAR(0&M ARMY RESERVE)
HEADQUARTERS FORT DEVENS
FORT DEVENS                      MA

MA-214020270 PROJECT: FTDE89S032
NPDES PERMITS SPILL-CONTAINMENT POINT SOURCE
ACCT: OMA OPERATIONS & MAINT.ARMY
HEADQUARTERS FORT DEVENS
FORT DEVENS                      MA

MA-214020270 PROJECT: F88-024
SPILL RESPONSE & REMEDIATION
ACCT: OMA OPERATIONS & MAINT.ARMY
HEADQUARTERS FORT DEVENS
FORT DEVENS                      MA

MA-214020270 PROJECT: F88-027
SPILL RESPONSE t REMEDIATION
ACCT: OMARIO&M ARMY RESERVE)
HEADQUARTERS FORT DEVENS
FORT DEVENS                      MA

MD-214020567 PROJECT: FTM089S023
ASBESTOS TRAINING
ACCT: OMA OPERATIONS & MAINT.ARMY
FORT MEADE
BALTIMORE                        MD

MD-214020567 PROJECT: FTM-89-013
ASBESTOS REMOVAL VARIOUS BUILDINGS - FAM HSG
ACCT: AFHU910) SERIESCSTUDIES.SURV
FORT MEADE
BALTIMORE                        MD
       50.0  ESDF
                           90/09  LOW     WATER
       50.0  ESDF   89/10   90/09   LOW     WATER
                                                    NOT
                                                   AVAIL
                                                    NOT
                                                   AVAIL
                                    NOT
                                   AVAIL
                                    NOT
                                   AVAIL
      100.0  ESRE
      100.0   ESRE
        6.0  ESDF
      250.0   ESDF
                           91/09 MEDIUM   WATER
91/09 MEDIUM   WATER
                           90/09 MEDIUM    AIR
                           90/09 MEDIUM    AIR
 NOT
AVAIL
 NOT
AVAIL
                                                  ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
                                                  ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
                        ADEQUATE  ADEQUATE   ADEQUATE
                         DESIGN    TIMING    ESTIMATE
                                                  ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE

-------
                                  FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                          DEPARTMENT  OF ARMY                      US ARMY FORCES COMMAND
                 PROJECT IDENTIFICATION
                     REQ     EST    PROJECT
  BUDGET     COMPL    COMPL   COMPL  ASSESS- MEDIA
(THOUSANDS)   STATUS   DATE    DATE   MENT    TYPE
                                                                                                                     ARMY-198
  ADEQUACY OF PROJECT
ENGIN-
EERING    TIME      COST
 MD-214020567 PROJECT:  FTM-89-012
 ASBESTOS REMOVAL  VARIOUS  BUILDINGS - USARCS
 ACCT:  OMARtOSM  ARMY  RESERVE)
 FORT  MEADE
 BALTIMORE                        MD

 MD-214020567 PROJECT:  FTM-89-011
 ASBESTOS REMOVAL  VARIOUS  BUILDINGS
 ACCT:  DMA OPERATIONS & MAINT.ARMY
 FORT MEADE
 BALTIMORE                        MD

 MD-214020567  PROJECT: FTM-89-007
 ASBESTOS REMOVAL  IN HOSPITAL
 ACCT:  DMA OPERATIONS & MAINT.ARMY
 FORT MEADE
 BALTIMORE                        MD

 MD-214020567  PROJECT: FTM089S029
 WTR CROSS-CONNECT/BACKFLOW PREV PROGRAM
 ACCT:  DMA OPERATIONS & MAINT.ARMY
 FORT MEADE
 BALTIMORE                        MD

 MD-214020567  PROJECT: FTM089S025
 EROSION & SEDIMENTATION CONTROL AT BURBA LAKE
ACCT: DMA OPERATIONS 4 MAINT.ARMY
 FORT MEADE
BALTIMORE                        MD

MD-214020567  PROJECT: FTM-89-006
RADON MITIGATION
ACCT: OMAR(0&M ARMY RESERVE)
 FORT MEADE
BALTIMORE                        MD
                                                      150.0  ESDF
      500.0   ESDF
      100.0   PSDF
      150.0   OTHR
      200.0  CMPA
      100.0   PSDF
                           90/09 MEDIUM    AIR     ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
                           90/09 MEDIUM    AIR
                                                  ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
                          90/09 MEDIUM    AIR     ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
                          90/09 MEDIUM  DRINKING  ADEQUATE  ADEQUATE   ADEQUATE
                                         WATER     DESIGN    TIMING    ESTIMATE
                          90/09  HIGH   MULTI     ADEQUATE  ADEQUATE   ADEQUATE
                                        MEDIA      DESIGN    TIMING    ESTIMATE
                          90/09 MEDIUM RADIATION  ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE

-------
                                 FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR  1991

                         DEPARTMENT OF ARMY                      US ARMY FORCES COMMAND
                PROJECT IDENTIFICATION
                     REQ    EST    PROJECT
  BUDGET     COMPL   COMPL  COMPL ASSESS- MEDIA
(THOUSANDS)   STATUS  DATE    DATE   MENT    TYPE
                                                                                                                     ARMY-199
  ADEQUACY OF PROJECT
ENGIN-
EERING    TIME      COST
MD-214020567 PROJECT: FTM-89-004
RADON MITIGATION
ACCT: AFHU920) SERIES (MAINT, REPA
FORT MEADE
BALTIMORE                        MD

MD-214020567 PROJECT: FTM-89-003
RADON TESTING
ACCT: AFHC1920) SERIES (MAINT, REPA
FORT MEADE
BALTIMORE                        MD

MD-214020567 PROJECT: FTM-89-001
RADON TESTING
ACCT: DMA OPERATIONS i MAINT,ARMY
FORT MEADE
BALTIMORE                        MD

MD-214020567 PROJECT: FTM-89-005
RADON MITIGATION
ACCT: OMA OPERATIONS t MAINT,ARMY
FORT MEADE
BALTIMORE                        MD

MD-214020567 PROJECT: MD-SF-1
INSTALLATION RESTORATION  RI/FS * RA
ACCT: DERA - OMA (OPERATIONS AND MA
FORT MEADE
BALTIMORE                        MD

KD-214020567 PROJECT: FTM089S034
INTALL LANDFILL COVER CAP
ACCT: OMA OPERATIONS & MAINT,ARMY
FORT MEADE
BALTIMORE                        MD
      200.0  PSDF
       10.0  ESDL
        6.0  ESDL
      250.0  ESDL
    1,050.0  ESDP
                           90/09 MEDIUM  RADIATION  ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
                           90/09  MEDIUM  RADIATION  ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
                           90/09  MEDIUM RADIATION  ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
                           90/09  MEDIUM RADIATION  ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
                           90/09  HIGH
    1,000.0  CMPA   90/06   90/09  HIGH
                                         CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
                                         SOLID    ADEQUATE  ADEQUATE   ADEQUATE
                                         WASTE     DESIGN    TIMING    ESTIMATE

-------
                                  FEDERAL  AGENCY  POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                          DEPARTMENT OF  ARMY                      US ARMY FORCES COMMAND
                 PROJECT IDENTIFICATION
                     REQ     EST   PROJECT
  BUDGET     COMPL    COMPL   COMPL ASSESS- MEDIA
(THOUSANDS)   STATUS   DATE    DATE  MENT    TYPE
                                                                     ARMY-200
    ADEQUACY OF PROJECT
  ENGIN-
  EERING    TIME      COST
 MD-214020567 PROJECT:  FTM089S013
 HAZARDOUS WASTE  PERMIT REQUIREMENT
 ACCT:  DMA OPERATIONS  £ MAINT.ARMY
 FORT MEADE
 BALTIMORE                       MD
        6.0   CMPA    96/12   90/09  HIGH    SOLID
                                         WASTE
ADEQUATE  ADEQUATE   ADEQUATE
 DESIGN    TIMING    ESTIMATE
 MD-214020567  PROJECT:  FTM0895014
 TRAINING UNDERGROUND STORAGE TANK PROGRAM
 ACCT: DMA OPERATIONS & MAINT.ARMY
 FORT MEADE
 BALTIMORE                        MD

 MD-214020567  PROJECT: FTM089S015
 REMOVE/REPLACE LEAKING UNDERGROUNG STORAGE TANK
 ACCT: OMA OPERATIONS & MAINT.ARMY
 FORT MEADE
 BALTIMORE                        MD

 MD-214020567  PROJECT: FTM089S016
 REMOVE/REPLACE LEAKING UNDERGROUND TANKS
 ACCT: OMAR(0&M ARMY RESERVE)
 FORT MEADE
 BALTIMORE                        MD

 MD-214020567  PROJECT: FTM089S021
 TEST CATHODIC PROTECTION SYSTEMS UST'S
 ACCT: OMAR(04M ARMY RESERVE)
 FORT MEADE
BALTIMORE                        MD

MD-214020567  PROJECT: FTM089S018
MONITORING MAINTENANCE, MONITORING WELLS UST'S
ACCT: OMA OPERATIONS 8 MAINT,ARMY
 FORT MEADE
BALTIMORE                        MD
        1.0   CMPA    88/12   90/09  HIGH    SOLID
                                         WASTE
      500.0   CMPA   88/12  90/09  HIGH
      50.0  CMPA   88/12  90/09  HIGH
                                         SOLID
                                         WASTE
                                         SOLID
                                         WASTE
       5.0  CMPA   88/12  90/09  HIGH    SOLID
                                         WASTE
      125.0  CMPA   88/12  90/09  HIGH    SOLID
                                         WASTE
ADEQUATE  ADEQUATE   ADEQUATE
 DESIGN    TIMING    ESTIMATE
ADEQUATE  ADEQUATE   ADEQUATE
 DESIGN    TIMING    ESTIMATE
ADEQUATE  ADEQUATE   ADEQUATE
 DESIGN    TIMING    ESTIMATE
ADEQUATE  ADEQUATE   ADEQUATE
 DESIGN    TIMING    ESTIMATE
ADEQUATE  ADEQUATE   ADEQUATE
 DESIGN    TIMING    ESTIMATE

-------
                                 FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                         DEPARTMENT OF ARMY                      US ARMY FORCES COMMAND
                PROJECT IDENTIFICATION
                     REQ    EST   PROJECT
  BUDGET     COMPL   COMPL  COMPL ASSESS- MEDIA
(THOUSANDS)  STATUS  DATE   DATE  MENT    TYPE
                                                                                                                      ARMY-201
             ADEQUACY OF PROJECT
           ENGIN-
           EERING    TIME      COST
MD-214020567 PROJECT: FTM089S019
MONITORING MAINTENANCE MONITROING WELLS USTS
ACCT: OMAR(04M ARMY RESERVE)
FORT MEADE
BALTIMORE                        MD

MD-214020567 PROJECT: FTM089S010
HAZARDOUS WASTE RESPONSE EQUIPMENT
ACCT: OMA OPERATIONS & MAINT.ARMY
FORT MEADE
BALTIMORE                        MD

MD-2K020567 PROJECT: FTM089S012
HAZARDOUS WASTE SAMPLING
ACCT: OMA OPERATIONS & MAINT.ARMY
FORT MEADE
BALTIMORE                        MD

MD-214020567 PROJECT: FTM089S007
DISPOSAL OF HAZARDOUS WASTE
ACCT: OMA OPERATIONS & MAINT.ARMY
FORT MEADE
BALTIMORE                        MD

MD-214020567 PROJECT: FTM089S009
HAZARDOUS WASTE TRAINING
ACCT: OMA OPERATIONS t MAINT.ARMY
FORT MEADE
BALTIMORE                        MD

MD-214020567 PROJECT: FTM089S006
DISPOSAL OF HAZARDOUS WASTE AT RESERVE CENTERS
ACCT: OMAR(0&M ARMY RESERVE)
FORT MEADE
BALTIMORE                        MD
       10.0  CMPA   88/12  90/09  HIGH
       25.0  CMPA   96/12  90/09  HIGH
       50.0  ESDP   96/12   90/09  HIGH
      100.0   ESDP   96/12   90/09   HIGH
                                          SOLID    ADEQUATE  ADEQUATE   ADEQUATE
                                          WASTE     DESIGN    TIMING    ESTIMATE
SOLID    ADEQUATE  ADEQUATE   ADEQUATE
WASTE     DESIGN    TIMING    ESTIMATE
       60.0  ESDP   96/12  90/09  HIGH     SOLID
                                          WASTE
      250.0  ESDP   96/12   90/09  HIGH     SOLID
                                          WASTE
         ADEQUATE  ADEQUATE   ADEQUATE
          DESIGN    TIMING    ESTIMATE
         ADEQUATE  ADEQUATE   ADEQUATE
          DESIGN    TIMING    ESTIMATE
SOLID    ADEQUATE  ADEQUATE   ADEQUATE
WASTE     DESIGN    TIMING    ESTIMATE
SOLID    ADEQUATE  ADEQUATE    ADEQUATE
WASTE     DESIGN    TIMING    ESTIMATE

-------
                                 FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR  1991

                         DEPARTMENT OF ARMY                      US ARMY FORCES COMMAND
                PROJECT IDENTIFICATION
                     REQ     EST    PROJECT
  BUDGET     COMPL   COMPL   COMPL  ASSESS- MEDIA
(THOUSANDS)   STATUS   DATE    DATE   MENT    TYPE
                                                                                                                     ARMY-202
    ADEQUACY OF PROJECT
  ENGIN-
  EERING    TIME      COST
MD-214020567 PROJECT: FTM089S017
REMOVE ABADONED UNDERGROUND STORAGE TANKS
ACCT: DMA OPERATIONS & MAINT.ARMY
FORT MEADE
BALTIMORE                        MD

MD-214020567 PROJECT: FTM089S020
TEST CATHODIC PROTECTION UNDERGROUND STORAGE TA
ACCT: OMA OPERATIONS & MAINT.ARMY
FORT MEADE
BALTIMORE                        MD

MD-214020567 PROJECT: F148
UNDERGROUND TANK TESTING/LEAK DETECTION
ACCT: OMA OPERATIONS & MAINT,ARMY
FORT MEADE
BALTIMORE                        MD

MD-214020567 PROJECT: FTM089S022
LEAK TESTING UNDERGROUND STORAGE TANKS
ACCT: OMARtO&M ARMY RESERVE)
FORT MEADE
BALTIMORE                        MD

MD-214020567 PROJECT: F88-040
TOPO LANDFILL
ACCT: OMA OPERATIONS & MAINT.ARMY
FORT MEADE
BALTIMORE                        MD

MD-214020567 PROJECT: FTM089S001
UPGRADE/RETROFIT EXISTING TANKS UST'S
ACCT: OMAR10&M ARMY RESERVE)
FORT MEADE
BALTIMORE                        MD
      500.0   ESDP    88/12   90/09  HIGH    SOLID
                                         WASTE
       15.0   ESDF    88/12   90/09 MEDIUM   SOLID
                                         WASTE
      100.0   ESDF    88/12   90/09 MEDIUM   SOLID
                                         WASTE
        6.0   ESDF    99/12   90/09 MEDIUM   SOLID
                                         WASTE
       25.0   ESDF
                           90/09 MEDIUM   SOLID
                                         WASTE
       10.0   ESDF    88/12   90/09 MEDIUM   SOLID
                                         WASTE
ADEQUATE  ADEQUATE   ADEQUATE
 DESIGN    TIMING    ESTIMATE
ADEQUATE  ADEQUATE   ADEQUATE
 DESIGN    TIMING    ESTIMATE
ADEQUATE  ADEQUATE   ADEQUATE
 DESIGN    TIMING    ESTIMATE
ADEQUATE  ADEQUATE   ADEQUATE
 DESIGN    TIMING    ESTIMATE
ADEQUATE  ADEQUATE   ADEQUATE
 DESIGN    TIMING    ESTIMATE
ADEQUATE  ADEQUATE   ADEQUATE
 DESIGN    TIMING    ESTIMATE

-------
                                 FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                         DEPARTMENT OF ARMY                      US ARMY FORCES COMMAND
                PROJECT IDENTIFICATION
                     REQ    EST   PROJECT
  BUDGET     COMPL   COMPL  COMPL ASSESS- MEDIA
(THOUSANDS)   STATUS  DATE    DATE   MENT    TYPE
                                                                                                                     ARMY-203
    ADEQUACY OF PROJECT
  ENGIN-
  EERING    TIME      COST
MD-2K020567 PROJECT: FTM089S002
RETROFIT/UPGRADE UNDEGROUND STORAGE TANKS
ACCT: DMA OPERATIONS t MAINT.ARMY
FORT MEADE
BALTIMORE                        MD

MD-214020567 PROJECT: FTM-SW-90
CONSTRUCT HW STORAGE/DISPOSAL BUILDING
ACCT: DMA OPERATIONS & MAINT.ARMY
FORT MEADE
BALTIMORE                        MD

MD-214020567 PROJECT: FTM089S004
SPILL PREV CONTROL AND COUNTERMEASURE PLAN
ACCT: OMARIO&M ARMY RESERVE)
FORT MEADE
BALTIMORE                        MD

MD-2U020567 PROJECT: FTM089S024
SEDIMENT & STMWTR CONTROL STRUCTURES/MEASURES
ACCT: DMA OPERATIONS & MAINT.ARMY
FORT MEADE
BALTIMORE                        MD

MD-214020567 PROJECT: FTM089S030
IRRIGATION WITH EFFLUENT WATER
ACCT: OMA OPERATIONS i MAINT.ARMY
FORT MEADE
BALTIMORE                        MD

NC-2140201Z1 PROJECT: FTBR169-9C
RADON SURVEY OF ARMY RESERVE FACILITIES
ACCT: OMAR(0&M ARMY RESERVE)
FORT BRAGG
FORT BRAGG                       NC
       50.0  ESDF   88/12   90/09  MEDIUM    SOLID
                                          WASTE
      200.0  ESDF
                           90/09  MEDIUM   SOLID
                                         WASTE
       75.0  CMPA   89/06   90/09   HIGH    WATER
      200.0  CMPA
      160.0  ESDL
        7.0  ESDL
                           90/09  HIGH    WATER
                           90/09 MEDIUM   WATER
                           90/09   LOW      AIR
ADEQUATE  ADEQUATE   ADEQUATE
 DESIGN    TIMING    ESTIMATE
ADEQUATE  ADEQUATE   ADEQUATE
 DESIGN    TIMING    ESTIMATE
ADEQUATE  ADEQUATE   ADEQUATE
 DESIGN    TIMING    ESTIMATE
                                                  ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
                                                  ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
                                                  ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE

-------
                                  FEDERAL AGENCY  POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                          DEPARTMENT OF  ARMY                      US ARMY FORCES COMMAND
                 PROJECT IDENTIFICATION
                     REQ    EST    PROJECT
  BUDGET     COMPL   COMPL   COMPL  ASSESS- MEDIA
(THOUSANDS)   STATUS  DATE    DATE   MENT    TYPE
                                                                     ARMY-204
    ADEQUACY OF PROJECT
  ENGIN-
  EERING    TIME      COST
 NC-214020121  PROJECT:  FTBR89S012
 RADON SURVEY  PRIORITY  2  AND  3 BLDGS
 ACCT: DMA OPERATIONS & MAINT.ARMY
 FORT BRAGG
 FORT BRAGG                      NC

 NC-214020121  PROJECT:  FTBR89S017
 CORRECT  EROSION  - MCFAYDEN POND
 ACCT:  OMA OPERATIONS 4 MAINT.ARMY
 FORT BRAGG
 FORT BRAGG                      NC

 NC-214020121  PROJECT:  FTBRS9S020
 ENDANGERED PLANT SURVEY
 ACCT: OMA OPERATIONS & MAINT.ARMY
 FORT  BRAGG
 FORT  BRAGG                       NC

 NC-214020121  PROJECT:  FTBR89S021
 ENDANGERED SPECIES MARKING
 ACCT: OMA OPERATIONS & MAINT.ARMY
 FORT BRAGG
 FORT BRAGG                       NC

 NC-214020121  PROJECT:  FTBR89S022
 SOIL  EROSION  SURVEY SCS
 ACCT: OMA OPERATIONS i MAINT.ARMY
 FORT BRAGG
 FORT BRAGG                       NC

NC-214020121  PROJECT:  FTBRS9S010
 INVENTORY VERIFICATION SURVEY - UG TANKS
ACCT: OMA OPERATIONS & MAINT.ARMY
 FORT BRAGG
 FORT BRAGG                       NC
       85.0   ESDL
       50.0   ESDF
       45.0   OTHR
       20.0  OTHR
      25.0  OTHR
                           90/09   LOW      AIR
                           90/09 MEDIUM  MULTI
                                        MEDIA
                           90/09 MEDIUM  MULTI
                                        MEDIA
                          90/09  LOW    MULTI
                                        MEDIA
                          90/09  LOW    MULTI
                                        MEDIA
      25.0  ESDP   89/06  90/09  HIGH    SOLID
                                         WASTE
                                                  ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
ADEQUATE  ADEQUATE   ADEQUATE
 DESIGN    TIMING    ESTIMATE
ADEQUATE  ADEQUATE   ADEQUATE
 DESIGN    TIMING    ESTIMATE
ADEQUATE  ADEQUATE   ADEQUATE
 DESIGN    TIMING    ESTIMATE
ADEQUATE  ADEQUATE   ADEQUATE
 DESIGN    TIMING    ESTIMATE
ADEQUATE  ADEQUATE   ADEQUATE
 DESIGN    TIMING    ESTIMATE

-------
                                 FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                         DEPARTMENT OF ARMY                      US ARMY FORCES COMMAND
                PROJECT IDENTIFICATION
                     REQ    EST   PROJECT
  BUDGET     COMPL   COMPL  COMPL ASSESS-  MEDIA
(THOUSANDS)  STATUS  DATE   DATE  MENT    TYPE
                                                                     ARMY-205
                            ADEQUACY  OF  PROJECT
                          ENGIN-
                          EERING    TIME      COST
NC-214020121 PROJECT: FTBR89S011
RETROFIT UST (NEW REQ) PHI
ACCT: OMA OPERATIONS & MAINT.ARMY
FORT BRAGG
FORT BRAGG                       NC

NC-214020121 PROJECT: FTBR89S001
REQUIRED CHEMICAL ANALYSIS
ACCT: OMA OPERATIONS & MAINTiARMY
FORT BRAGG
FORT BRAGG                       NC

NC-214020121 PROJECT: FTBR89S003
HAZ MAT SPILL TRAINING
ACCT: OMA OPERATIONS & MAINT.ARMY
FORT BRAGG
FORT BRAGG                       NC

NC-214020121 PROJECT: FTBR89S006
REMEDIAL ACTION FACILITY INSPECTION
ACCT: DERA - OMA (OPERATIONS AND MA
FORT BRAGG
FORT BRAGG                       NC

NC-214020121 PROJECT: FTBR89S014
REM ASBESTOS IN SCHOOLS PER AHERA
ACCT: OMA OPERATIONS 4 MAINT.ARMY
FORT BRAGG
FORT BRAGG                       NC

NC-214020121 PROJECT: FTBR89S016
ASBESTOS REMOVAL,IN-HOUSE CREW-TRAINING & SUPPL
ACCT: OMA OPERATIONS & MAINT.ARMY
FORT BRAGG
FORT BRAGG                       NC
      130.0  ESDP   89/12  90/09  HIGH
       50.0  ESDP
       15.0  ESDP
90/09  HIGH
                                          SOLID    ADEQUATE  ADEQUATE   ADEQUATE
                                          WASTE     DESIGN    TIMING    ESTIMATE
                                          SOLID    ADEQUATE  ADEQUATE   ADEQUATE
                                          WASTE     DESIGN    TIMING    ESTIMATE
                           90/09  HIGH     SOLID    ADEQUATE  ADEQUATE   ADEQUATE
                                          WASTE     DESIGN    TIMING    ESTIMATE
      130.0  ESDF    95/01   90/09  MEDIUM   SOLID    ADEQUATE  ADEQUATE   ADEQUATE
                                         WASTE     DESIGN    TIMING    ESTIMATE
      300.0  ESDP   89/06   90/09  HIGH    TOXIC    ADEQUATE  ADEQUATE   ADEQUATE
                                       SUBSTANCE   DESIGN    TIMING    ESTIMATE
      100.0   ESDP   89/03   90/09   LOW     TOXIC    ADEQUATE  ADEQUATE   ADEQUATE
                                       SUBSTANCE   DESIGN    TIMING    ESTIMATE

-------
                                  FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                          DEPARTMENT  OF ARMY                      US ARMY FORCES COMMAND
                 PROJECT IDENTIFICATION
                     REQ     EST    PROJECT
  BUDGET     COMPL    COMPL   COMPL  ASSESS- MEDIA
(THOUSANDS)   STATUS   DATE    DATE   MENT    TYPE
                                                                                                                      ARMY-206
  ADEQUACY OF PROJECT
ENGIN-
EERING    TIME      COST
 NC-214020121  PROJECT:  FTBR89S002
 ANALYZE  AND MARK  UNKNOWN TRANSFORMERS
 ACCT:  DMA OPERATIONS & MAINT.ARMY
 FORT BRAGG
 FORT BRAGG                      NC

 NC-214020121  PROJECT:  FTBR16S-9A
 ASBESTOS  ABATEMENT ARMY RESERVE FACILITIES
 ACCT:  OMARtO&M ARMY RESERVE)
 FORT BRAGG
 FORT BRAGG                       NC

 NC-214020121  PROJECT:  FTBR168-9B
 ASBESTOS  ABATEMENT POSTWIDE
 ACCT: DMA OPERATIONS & MAINT,ARMY
 FORT BRAGG
 FORT BRAGG                       NC

NC-214020121  PROJECT:  FTBR168-9C
ASBESTOS ABATEMENT OF ARMY FAMILY HOUSING
ACCT: AFHU920) SERIES (MAINT, REPA
 FORT BRAGG
 FORT BRAGG                       NC

NC-214020121  PROJECT: FTBR168-9D
ASBESTOS SURVEY OF ARMY FAMILY HOUSING
ACCT: AFHC1910) SERIESfSTUDIES,SURV
FORT BRAGG
FORT BRAGG                       NC

NC-214020121  PROJECT: FTBR89S015
ASBESTOS SURVEY PHASE III
ACCT: DMA OPERATIONS & MAINT.ARMY
FORT BRAGG
FORT BRAGG                       NC
                                                       65.0  ESDP
       75.0   ESDF
      353.0   ESDF
      170.0   ESDF
       76.0  ESDI
      200.0  ESDL
                           90/09  HIGH    TOXIC    ADEQUATE  ADEQUATE   ADEQUATE
                                       SUBSTANCE   DESIGN    TIMING    ESTIMATE
                           90/09   LOW     TOXIC    ADEQUATE  ADEQUATE   ADEQUATE
                                       SUBSTANCE   DESIGN    TIMING    ESTIMATE
                          90/09  LOW     TOXIC    ADEQUATE  ADEQUATE   ADEQUATE
                                       SUBSTANCE   DESIGN    TIMING    ESTIMATE
                          90/09  LOW     TOXIC    ADEQUATE  ADEQUATE   ADEQUATE
                                       SUBSTANCE   DESIGN    TIMING    ESTIMATE
                          90/09  LOW     TOXIC    ADEQUATE  ADEQUATE   ADEQUATE
                                       SUBSTANCE   DESIGN    TIMING    ESTIMATE
                          90/09  LOW     TOXIC    ADEQUATE  ADEQUATE   ADEQUATE
                                       SUBSTANCE   DESIGN    TIMING    ESTIMATE

-------
                                 FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                         DEPARTMENT OF ARMY                      US ARMY FORCES COMMAND
                PROJECT IDENTIFICATION
                     REQ    EST   PROJECT
  BUDGET     COMPL   COMPL  COMPL ASSESS- MEDIA
(THOUSANDS)  STATUS  DATE   DATE   MENT    TYPE
                                                                     ARMY-207
    ADEQUACY OF PROJECT
  ENGIN-
  EERING    TIME      COST
NC-214020121 PROJECT: FTBRS9S023
CORRECT EROSION - SICILY DROP ZONE
ACCT: DMA OPERATIONS ft MAINT.ARMY
FORT BRAGG
FORT BRAGG                       NC

NC-214020121 PROJECT: FTBR89S01S
CORRECT EROSION - MAJOR ROADS
ACCT: OMA OPERATIONS & MAINT.ARMY
FORT BRAGG
FORT BRAGG                       NC

NC-214020121 PROJECT: FTBR89S019
CORRECT EROSION - SMITH LAKE
ACCT: OMA OPERATIONS & MAINT.ARMY
FORT BRAGG
FORT BRAGG                       NC

NC-214020121 PROJECT: FW00065-6
POLLUTION ABATEMENT - CLEANUP OIL SPILLAGE
ACCT: OMA OPERATIONS ft MAINT.ARMY
FORT BRAGG
FORT BRAGG                       NC

NC-214020121 PROJECT: FTBRS9S009
CONSTRUCT EMcRG SPCC FACILITIES
ACCT: OMA OPERATIONS ft MAINT.ARMY
FORT BRAGG
FORT BRAGG                       NC

NC-214020121 PROJECT: FTBR89S027
FIREBREAK UPGRADE, COLONIAL PIPE LINE
ACCT: OMA OPERATIONS & MAINT.ARMY
FORT BRAGG
FORT BRAGG                       NC
      400.0  ESDF
       50.0  ESDF
       50.0  ESDF
       40.0  ESDF
       20.0  ESRE
       15.0  OTHR
                           90/09  MEDIUM   WATER
                           90/09  MEDIUM   WATER
                           90/09  MEDIUM   WATER
                           90/09 MEDIUM   WATER
                           90/09   LOW     WATER
                           90/09   LOW     WATER
                                                  ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
                                                  ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
ADEQUATE  ADEQUATE   ADEQUATE
 DESIGN    TIMING    ESTIMATE
                                                  ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
                                                  ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
                                                  ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE

-------
                                  FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                          DEPARTMENT  OF ARMY                      US ARMY FORCES COMMAND
                 PROJECT IDENTIFICATION
                     REQ     EST    PROJECT
  BUDGET     COMPL    COMPL   COMPL  ASSESS- MEDIA
(THOUSANDS)   STATUS   DATE    DATE   MENT    TYPE
                                                                     ARMY-208
  ADEQUACY OF PROJECT
ENGIN-
EERING    TIME      COST
 NY-214020281  PROJECT:  DERF	I
 CLEAN UP FUEL SEEPAGE  AREA  1595
 ACCT: DERA -  DMA  (OPERATIONS AND MA
 FORT DRUM
 FORT DRUM                       NY

 NY-214020281  PROJECT:  DRUM  0001
 LUST CLEANUP  OF LEAKING POL TANKS
 ACCT:  DERA  -  OMA  (OPERATIONS AND MA
 FORT DRUM
 FORT DRUM                       NY

 NY-214020281  PROJECT:  FTDR-00029
 RI/FS  WW  II DUMP SITE
 ACCT:  DERA  -  OMA (OPERATIONS AND MA
 FORT DRUM
 FORT DRUM                        NY

 NY-214020281  PROJECT:  FTDR-00024
 SITE CLEANUP  NJNG
 ACCT:  DERA  -  OMA (OPERATIONS AND MA
 FORT DRUM
 FORT DRUM                        NY

 NY-214020281  PROJECT:  FTDR-00019
 OLD  FIRE TRNG PIT EVALUATION
 ACCT:  DERA  -  OMA (OPERATIONS AND MA
 FORT DRUM
 FORT DRUM                        NY

NY-214020281  PROJECT:  FTDR-00030
GAS ALLEY GROUNDWATER  CONTAMINATION
ACCT:  DERA  -  OMA (OPERATIONS AND MA
 FORT DRUM
 FORT DRUM                        NY
                                                      500.0  ESDP
      100.0   PSDF
      100.0   PSDF
      100.0   PSDF
      50.0  PSDF
      100.0  PSDF
                           90/09  HIGH    CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
                           90/09 MEDIUM   CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
                          90/09 MEDIUM   CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
                          90/09 MEDIUM   CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
                          90/09 MEDIUM   CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
                          90/09 MEDIUM   CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE

-------
                                 FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                         DEPARTMENT OF ARMY                      US ARMY FORCES COMMAND
                PROJECT IDENTIFICATION
                     REQ    EST   PROJECT
  BUDGET     COMPL   COMPL  COMPL ASSESS- MEDIA
(THOUSANDS)  STATUS  DATE   DATE  MENT    TYPE
                                                                     ARMY-209
                            ADEQUACY  OF  PROJECT
                          ENGIN-
                          EERING   TIME      COST
NY-214020281 PROJECT: FTDR-00027
HAZARDOUS WASTE ANALYSIS RESERVES
ACCT: OMARIO&M ARMY RESERVE)
FORT DRUM
FORT DRUM                        NY

NY-214020281 PROJECT: FD00000004
POL TANK TESTING AND REPL PROJECT
ACCT: DMA OPERATIONS & MAINT.ARMY
FORT DRUM
FORT DRUM                        NY

NY-214020281 PROJECT: DERF	II
HAZ. WASTE STORAGE FAC. CLOSURE CONTRACT
ACCT: DERA - DMA (OPERATIONS AND MA
FORT DRUM
FORT DRUM                        NY

NY-214020281 PROJECT: FRTD-00028
HAZARDOUS WASTE ANALYSIS FT DRUM
ACCT: DMA OPERATIONS t MAINT.ARMY
FORT DRUM
FORT DRUM                        NY

NY-214020281 PROJECT: FTDR-00015
HAZARDOUS WASTE DISPOSAL
ACCT: OMA OPERATIONS t MAINT.ARMY
FORT DRUM
FORT DRUM                        NY

NY-214020281 PROJECT: FTDR-00022
SPILL CONTAINMENT USARS AND AMSAS
ACCT: OMAR(04M ARMY RESERVE)
FORT DRUM
FORT DRUM                        NY
       20.0  ESDF   92/11   90/09  HIGH
       75.0  ESDF   88/12  90/09  HIGH
       45.0  PSDF
      250.0  PSDF
       30.0  PSDF
90/09  HIGH
                           90/09  HIGH
                                          SOLID
                                          WASTE
                                          SOLID
                                          WASTE
       50.0  ESDF   92/11   90/09  HIGH    SOLID
                                         WASTE
                                         SOLID
                                         WASTE
                                         SOLID
                                         WASTE
                           90/09 MEDIUM   WATER
                        ADEQUATE  ADEQUATE    ADEQUATE
                         DESIGN    TIMING    ESTIMATE
                        ADEQUATE  ADEQUATE    ADEQUATE
                         DESIGN    TIMING     ESTIMATE
                        ADEQUATE   ADEQUATE   ADEQUATE
                         DESIGN    TIMING    ESTIMATE
                        ADEQUATE  ADEQUATE   ADEQUATE
                         DESIGN    TIMING    ESTIMATE
                        ADEQUATE  ADEQUATE   ADEQUATE
                         DESIGN    TIMING    ESTIMATE
                                                  ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE

-------
                                  FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                          DEPARTMENT  OF ARMY                      US ARMY FORCES COMMAND
                 PROJECT IDENTIFICATION
                     REQ     EST   PROJECT
  BUDGET     COMPL   COMPL   COMPL ASSESS- MEDIA
(THOUSANDS)   STATUS   DATE    DATE  MENT    TYPE
                                                                                                                      ARMY-210
    ADEQUACY OF PROJECT
  ENGIN-
  EERING    TIME      COST
 NY-2140202S1  PROJECT:  FTDR-00023
 SPILL CONTAINMENT  FT DRUM
 ACCT:  DMA  OPERATIONS £ MAINT,ARMY
 FORT  DRUM
 FORT  DRUM                        NY

 PA-214020444  PROJECT:  FIG9017002
 RADON  SCREENING: FORT  INDIANTOWN GAP
 ACCT:  OMA  OPERATIONS & MAINT.ARMY
 USARC  EDGEMONT
 ANNVILLE                         PA

 PA-214020444  PROJECT:  FIG8337005
 MONITOR LANDFILL WELLS
 ACCT:  DMA  OPERATIONS £ MAINT.ARMY
 USARC EDGEMONT
 ANNVILLE                         PA

 PA-214020444  PROJECT:  FIG-2
HAZARDOUS  WASTE DISPOSAL
ACCT:  OMA  OPERATIONS & MAINT.ARMY
USARC EDGEMONT
ANNVILLE                         PA

 PA-21<+0204<+4  PROJECT:  FIS8336001
UPGRADE USTS TO MEET NEW STANDARDS
 ACCT:  OMA  OPERATIONS & MAINT,ARMY
USARC EDGEMONT
ANNVILLE                         PA

PR-2140RQ327 PROJECT:  FTBU89S003
ENVIRONMENTAL TRAINING
ACCT:  OMA  OPERATIONS & MAINT.ARMY
FORT BUCHANAN
 FT BUCHANAN                      PR
                                                       50.0  PSDF
       10.0   ESDL
       10.0   INOV
       90.0   ESDF
                           90/09 MEDIUM   WATER    ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
                           90/09 MEDIUM RADIATION  ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
                           90/09  HIGH    SOLID
                                         WASTE
                          90/09 MEDIUM   SOLID
                                         WASTE
      200.0   ESDF   90/12  90/09 MEDIUM   SOLID
                                         WASTE
       10.0  OTHR
                          90/09  LOW    MULTI
                                        MEDIA
ADEQUATE  ADEQUATE   ADEQUATE
 DESIGN    TIMING    ESTIMATE
ADEQUATE  ADEQUATE   ADEQUATE
 DESIGN    TIMING    ESTIMATE
ADEQUATE  ADEQUATE   ADEQUATE
 DESIGN    TIMING    ESTIMATE
ADEQUATE  ADEQUATE   ADEQUATE
 DESIGN    TIMING    ESTIMATE

-------
                                 FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                         DEPARTMENT OF ARMY                      US ARMY FORCES COMMAND
                PROJECT IDENTIFICATION
                     REQ    EST   PROJECT
  BUDGET     COMPL   COMPL  COMPL ASSESS-  MEDIA
(THOUSANDS)   STATUS  DATE   DATE   MENT     TYPE
                                                                                                                     ARMY-211
  ADEQUACY OF PROJECT
ENGIN-
EERING    TIME      COST
PR-2140RQ327 PROJECT: FTBU89S009
LUST PERMIT FEE USAR CENTER
ACCT: OMARCO&M ARMY RESERVE)
FORT BUCHANAN
FT BUCHANAN                      PR

PR-2140RQ327 PROJECT: FTBU89S001
LUST PERMIT FEE FORT BUCHANAN
ACCT: OMA OPERATIONS t MAINT.ARMY
FORT BUCHANAN
FT BUCHANAN                      PR

PR-2140RQ327 PROJECT: FTBUS9S007
HAZARDOUS MATERIAL TURN IN TO DRMO POST
ACCT: OMA OPERATIONS & MAINT.ARMY
FORT BUCHANAN
FT BUCHANAN                      PR

PR-2140RQ327 PROJECT: FTBU89S008
HAZARDOUS MATERIAL TURN IN TO DRMO USAR
ACCT: OMAR(0&M ARMY RESERVE)
FORT BUCHANAN
FT BUCHANAN                      PR

PR-2140RQ327 PROJECT: FTBU89S005
CLEAN UP CONTAMINATED AREAS AT USAR CENTERS
ACCT: OMAR(0&M ARMY RESERVE)
FORT BUCHANAN
FT BUCHANAN                      PR

PR-2140RQ327 PROJECT: FTBU89S006
CLEAN UP OF CONTAMINATED AREAS ON FORT BUCHANAN
ACCT: OMA OPERATIONS i MAINT.ARMY
FORT BUCHANAN
FT BUCHANAN                      PR
        6.0  PSDF
        5.0  PSDF
        7.0  PSDF
        7.0  PSDF
       10.0  PSDF
       10.0  PSDF
                           90/09   HIGH     SOLID    ADEQUATE  ADEQUATE   ADEQUATE
                                          WASTE     DESIGN    TIMING    ESTIMATE
                           90/09   HIGH     SOLID    ADEQUATE  ADEQUATE   ADEQUATE
                                          WASTE     DESIGN    TIMING    ESTIMATE
                           90/09  HIGH    TOXIC    ADEQUATE  ADEQUATE   ADEQUATE
                                       SUBSTANCE   DESIGN    TIMING    ESTIMATE
                           90/09  HIGH    TOXIC    ADEQUATE  ADEQUATE   ADEQUATE
                                       SUBSTANCE   DESIGN    TIMING    ESTIMATE
                           90/09 MEDIUM   TOXIC    ADEQUATE  ADEQUATE   ADEQUATE
                                       SUBSTANCE   DESIGN    TIMING    ESTIMATE
                           90/09  HIGH    TOXIC    ADEQUATE  ADEQUATE   ADEQUATE
                                       SUBSTANCE   DESIGN    TIMING    ESTIMATE

-------
                                  FEDERAL AGENCY  POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                          DEPARTMENT OF  ARMY                      US ARMY FORCES COMMAND
                 PROJECT IDENTIFICATION
                     REQ    EST    PROJECT
  BUDGET     COMPL   COMPL  COMPL  ASSESS- MEDIA
(THOUSANDS)   STATUS   DATE    DATE   MENT    TYPE
                                                                     ARMY-212
  ADEQUACY OF PROJECT
ENGIN-
EERING    TIME      COST
 PR-2140RQ327 PROJECT:  FTBU89S004
 HAZARDOUS WASTE STORAGE  AREA
 ACCT:  OMA OPERATIONS S MAINT.ARMY
 FORT BUCHANAN
 FT  BUCHANAN                     PR

 PR-2140RQ327 PROJECT:  FTBU89S002
 AIR  PERMIT  FEE
 ACCT:  OMA OPERATIONS & MAINT.ARMY
 FORT BUCHANAN
 FT BUCHANAN                     PR

 TX-214020424  PROJECT:  HOOD0001
 CLOSE  TWO FORMER ACID  NEUTRALIZATION SITES
 ACCT:  DERA  -  OMA (OPERATIONS AND MA
 FORT HOOD
 FORT HOOD                        TX

 TX-214020429  PROJECT:  ASBSFSH01
 ASBESTOS REMEDIAL ACTION
 ACCT: OMA OPERATIONS & MAINT,ARMY
 FORT SAM HOUSTON
 FORT SAM HOUSTON                 TX

 TX-214020429  PROJECT:  FTSAASB002
 ASBESTOS REMEDIAL ACTION AS IDENTIFIED
 ACCT: OMAR(0&M ARMY RESERVE)
 FORT SAM HOUSTON
 FORT SAM HOUSTON                 TX

TX-214020429  PROJECT:  F88-062
 ETHYLENE OXIDE EMISSIONS TESTING
ACCT: OMA OPERATIONS & MAINT.ARMY
 FORT SAM HOUSTON
 FORT SAM HOUSTON                 TX
                                                       50.0  ESDL
        5.0   OTHR
                           90/09   LOW     TOXIC    ADEQUATE  ADEQUATE   ADEQUATE
                                       SUBSTANCE   DESIGN    TIMING    ESTIMATE
                           90/09 MEDIUM   TOXIC    ADEQUATE  ADEQUATE   ADEQUATE
                                       SUBSTANCE   DESIGN    TIMING    ESTIMATE
      100.0   ESDP    90/01  90/09  HIGH    CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
      450.0   ESRO
     600.0  ESRO
      20.0  ESDL
                          90/09 MEDIUM    AIR     ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
                          90/09 MEDIUM    AIR     ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
                          90/09  LOW      AIR     ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE

-------
                                 FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                         DEPARTMENT OF ARMY                      US ARMY FORCES COMMAND
                PROJECT IDENTIFICATION
                     REQ    EST   PROJECT
  BUDGET     COMPL   COMPL  COMPL ASSESS-  MEDIA
(THOUSANDS)  STATUS  DATE   DATE  MENT     TYPE
                                                                     ARMY-213
                            ADEQUACY OF  PROJECT
                          ENGIN-
                          EERING    TIME      COST
TX-214020429 PROJECT: F88-064
AIR POLLUTION POINT SOURCE EMISSION INVENTORY
ACCT: DMA OPERATIONS * MAINT.ARMY
FORT SAM HOUSTON
FORT SAM HOUSTON                 TX

TX-214020429 PROJECT: F88-060
AIR POLLUTION ANNUAL PERMIT FEE
ACCT: DMA OPERATIONS 4 MAINT.ARMY
FORT SAM HOUSTON
FORT SAM HOUSTON                 TX

TX-214020429 PROJECT: FTSA89S007
ENVIRONMENTAL CHEMICAL TESTINT - ANALYSIS
ACCT: DMA OPERATIONS & MAINT.ARMY
FORT SAM HOUSTON
FORT SAM HOUSTON                 TX

TX-214020429 PROJECT: FTSA89S005
ENVIRONMENTAL EQUIPMENT PURCHASE
ACCT: DMA OPERATIONS t MAINT.ARMY
FORT SAM HOUSTON
FORT SAM HOUSTON                 TX

TX-214020429 PROJECT: FTSANOS002
NOISE CONTOUR PREPARATION AT CAMP BULLIS
ACCT: DMA OPERATIONS « MAINT.ARMY
FORT SAM HOUSTON
FORT SAM HOUSTON                 TX

TX-214020429 PROJECT: F88-066
SERVICE CONTRACT TO DISPOSE OF HAZ WASTE
ACCT: DMA OPERATIONS t MAINT.ARMY
FORT SAM HOUSTON
FORT SAM HOUSTON                 TX
       50.0  ESDL
        8.0  OTHR
       50.0  ESDP
       28.0  ESDL
                           90/09 MEDIUM   AIR
90/09 MEDIUM    AIR
                           90/09  HIGH   MULTI
                                        MEDIA
                           90/09   LOW
       80.0   ESDL   89/12   90/09   LOW
                                        MULTI
                                        MEDIA
                                         NOISE
       50.0   INOV
                          90/09  HIGH    SOLID
                                         WASTE
                                                  ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
                                                  ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
                        ADEQUATE   ADEQUATE   ADEQUATE
                         DESIGN    TIMING    ESTIMATE
                        ADEQUATE  ADEQUATE   ADEQUATE
                         DESIGN    TIMING    ESTIMATE
                                                  ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
                       ADEQUATE  ADEQUATE   ADEQUATE
                        DESIGN    TIMING    ESTIMATE

-------
                                  FEDERAL  AGENCY  POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                          DEPARTMENT  OF  ARMY                      US ARMY FORCES COMMAND
                 PROJECT IDENTIFICATION
                     REQ     EST    PROJECT
  BUDGET     COMPL   COMPL   COMPL  ASSESS- MEDIA
(THOUSANDS)   STATUS   DATE    DATE   MENT    TYPE
                                                                     ARMY-214
  ADEQUACY OF PROJECT
ENGIN-
EERING    TIME      COST
 TX-214020429 PROJECT:  HAZFSH01
 HAZARDOUS WASTE  DISPOSAL  CONTRACT
 ACCT:  DMA OPERATIONS  & MAINT.ARMY
 FORT SAM HOUSTON
 FORT SAM HOUSTON                TX

 TX-214020429 PROJECT:  FTSAHAZ002
 UNDERGROUND  STORAGE TANK  REMEDIATION
 ACCT:  OMA OPERATIONS i MAINT.ARMY
 FORT SAM HOUSTON
 FORT SAM HOUSTON                TX

 TX-214020429  PROJECT:  FTSA89S002
 UNDERGROUND STORAGE TANK  MONITORING EQUIP
 ACCT: OMA  OPERATIONS *  MAINT.ARMY
 FORT SAM HOUSTON
 FORT SAM HOUSTON                TX

TX-214020429  PROJECT:  F88-069
 PCB TESTING OF TRANSFORMERS BEFORE DISPOSAL
ACCT: OMA  OPERATIONS &  MAINT.ARMY
 FORT SAM HOUSTON
 FORT SAM HOUSTON                 TX

TX-214020429  PROJECT:  F88-061
 ENVIRONMENTAL TRAINING  AND CERTIFICATION
ACCT: OMA  OPERATIONS &  MAINT.ARMY
 FORT SAM HOUSTON
FORT SAM HOUSTON                 TX

TX-214020<+29  PROJECT:  FTSA89S006
EQUIPMENT  MATERIALS WASTE WATER/HAZARDOUS WASTE
ACCT: OMA  OPERATIONS &  MAINT,ARMY
FORT SAM HOUSTON
FORT SAM HOUSTON                 TX
                                                      200.0  ESDP
                           90/09  HIGH    SOLID    ADEQUATE  ADEQUATE   ADEQUATE
                                         WASTE     DESIGN    TIMING    ESTIMATE
      500.0   ESDP    88/12   90/09  HIGH    SOLID    ADEQUATE  ADEQUATE   ADEQUATE
                                         WASTE     DESIGN    TIMING    ESTIMATE
       50.0   ESDF   89/12  90/09 MEDIUM   SOLID    ADEQUATE  ADEQUATE   ADEQUATE
                                         WASTE     DESIGN    TIMING    ESTIMATE
       10.0   ESDP    91/09  90/09  HIGH    TOXIC    ADEQUATE  ADEQUATE   ADEQUATE
                                       SUBSTANCE   DESIGN    TIMING    ESTIMATE
       35.0   ESDF
       60.0   ESDP
                          90/09 MEDIUM   TOXIC    ADEQUATE  ADEQUATE   ADEQUATE
                                       SUBSTANCE   DESIGN    TIMING    ESTIMATE
                          90/09  HIGH    WATER    ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE

-------
                                 FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                         DEPARTMENT OF ARMY                      US ARMY FORCES COMMAND
                PROJECT IDENTIFICATION
                     REQ    EST   PROJECT
  BUDGET     COMPL   COMPL  COMPL ASSESS-  MEDIA
(THOUSANDS)   STATUS  DATE   DATE   MENT     TYPE
                                                                                                                     ARMY-215
    ADEQUACY OF PROJECT
  ENGIN-
  EERING    TIME      COST
TX-214020429 PROJECT: FTSA89S001
SPILL CONTINGENCY 1  MATERIALS CLEAN UP
ACCTi OMA OPERATIONS ft MAINT.ARMY
FORT SAM HOUSTON
FORT SAM HOUSTON                 TX

TX-214020429 PROJECT: F88-056
VARIOUS ENVIRONMENTAL DOCUMENTS/STUDIES
ACCT: OMA OPERATIONS & MAINT,ARMY
FORT SAM HOUSTON
FORT SAM HOUSTON                 TX

UT-214020278 PROJECT: D00089S001
SITE INVESTIGATION OF LEAKING UST'S
ACCT: DERA - OMA (OPERATIONS AND MA
FORT DOUGLAS
SALT LAKE CITY                   UT

VA-214020416 PROJECT: 2026 9* M
ASBESTOS REMOVAL
ACCT: OMA OPERATIONS * MAINT.ARMY
FORT A.P. HILL
BOWLING GREEN                    VA

VA-214020416 PROJECT: APHILL0008
LANDFILL RI/FS AND RA
ACCT: DERA - OMA (OPERATIONS AND MA
FORT A.P. HILL
BOWLING GREEN                    VA

VA-214020416 PROJECT: APHILL0001
LUST CLEANUP/REPLACEMENT
ACCT: OMA OPERATIONS & MAINT.ARMY
FORT A.P. HILL
BOWLING GREEN                    VA
       50.0  ESRE   90/01   90/09  LOW
      120.0  ESDL
       50.0  ESDP
      500.0  ESDL
                           90/09  LOW
                           90/09   HIGH
       20.0  ESDP   90/10   90/09  HIGH
      750.0  INOV   93/10   90/09  HIGH
                                          WATER
                                         WATER
                           90/09   HIGH    SOLID
                                         WASTE
                                          AIR
                                                  ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
ADEQUATE  ADEQUATE   ADEQUATE
 DESIGN    TIMING    ESTIMATE
  NOT       NOT
 AVAIL     AVAIL
 NOT
AVAIL
                                                  ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
                                         CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
                                         SOLID    ADEQUATE  ADEQUATE   ADEQUATE
                                         WASTE     DESIGN    TIMING    ESTIMATE

-------
                                  FEDERAL  AGENCY  POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                          DEPARTMENT  OF  ARMY                      US ARMY FORCES COMMAND
                 PROJECT IDENTIFICATION
                     REQ    EST    PROJECT
  BUDGET     COMPL   COMPL   COMPL  ASSESS- MEDIA
(THOUSANDS)   STATUS   DATE    DATE   MENT    TYPE
                                                                                                                      ARMY-216
    ADEQUACY OF PROJECT
  ENGIN-
  EERING    TIME      COST
 VA-214020416 PROJECT:  APHILL0004
 ANALYSIS OF  GROUNDWATER
 ACCT:  OMA OPERATIONS  & MAINT.ARMY
 FORT A.P.  HILL
 BOWLING  GREEN                   VA

 VA-214020705 PROJECT:  46-87
 INVESTIGATE  REMEDY UNDERGROUND TANKS
 ACCT:  DERA - OMA  (OPERATIONS AND MA
 FORT PICKETT
 BLACKSTONE                       VA

 WA-214020506  PROJECT:  FTL089S014
 ANNUAL PERMIT FEES (AIR & HAZARDOUS WASTE)
 ACCT: OMA OPERATIONS & MAINT,ARMY
 FORT LEWIS
 TACOMA                           WA

 WA-214020506 PROJECT: FTL089S030
 ARMY RADON PROGRAM
 ACCT: OMA OPERATIONS & MAINT,ARMY
 FORT LEWIS
 TACOMA                           WA

 WA-214020506 PROJECT: FTL089S008
 NEPA ENVIRONMENTAL DOCUMENTATION REPORTS
 ACCT: OMA OPERATIONS S. MAINT.ARMY
 FORT LEWIS
 TACOMA                           WA

WA-214020506 PROJECT: FTL089S007
 ENVIRONMENTAL SERVICES CONTRACT
ACCT: OMA OPERATIONS & MAINT.ARMY
 FORT LEWIS
TACOMA                           WA
                                                       10.0  ESDL
      300.0   ESDP
       55.0   ESDP
      225.0   ESDL
      100.0   PSDF
      125.0   ESRO
                           90/09  HISH    SOLID
                                         WASTE
                           90/09  HIGH
                           90/09  HIGH
                                         SOLID
                                         WASTE
                                          AIR
                           90/09 MEDIUM    AIR
                          90/09 MEDIUM  MULTI
                                        MEDIA
                          90/09 MEDIUM  MULTI
                                        MEDIA
ADEQUATE  ADEQUATE   ADEQUATE
 DESIGN    TIMING    ESTIMATE
ADEQUATE  ADEQUATE   ADEQUATE
 DESIGN    TIMING    ESTIMATE
                                                  ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
                                                  ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
ADEQUATE  ADEQUATE   ADEQUATE
 DESIGN    TIMING    ESTIMATE
ADEQUATE  ADEQUATE   ADEQUATE
 DESIGN    TIMING    ESTIMATE

-------
                                 FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                         DEPARTMENT OF ARMY                      US ARMY FORCES COMMAND
                PROJECT IDENTIFICATION
                     REQ    EST   PROJECT
  BUDGET     COMPL   COMPL  COMPL ASSESS-  MEDIA
(THOUSANDS)  STATUS  DATE   DATE  MENT    TYPE
                                                                                                                      ARMY-217
                            ADEQUACY OF  PROJECT
                          ENGIN-
                          EERING    TIME      COST
WA-214020506 PROJECT: FTL089S006
COMPUTERIZE ENVIRONMENTAL MAPS
ACCT: OMA OPERATIONS t MAINT.ARMY
FORT LEWIS
TACOMA                           WA

WA-214020506 PROJECT: FTL089S019
YFC EROSION SEDIMENT MONITORING
ACCT: OMA OPERATIONS & MAINT,ARMY
FORT LEWIS
TACOMA                           WA

WA-214020506 PROJECT: FTL089S020
REPAIR SENSITIVE SITES
ACCT: OMA OPERATIONS & MAINT.ARMY
FORT LEWIS
TACOMA                           WA

WA-214020506 PROJECT: FTL089S009
REMOTE SENSING PROGRAM, LAND DAMAGE
ACCT: OMA OPERATIONS t MAINT.ARMY
FORT LEWIS
TACOMA                           WA

WA-214020506 PROJECT: FTL089S017
IPA-WILDLIFE BIOLOGIST FOR YFC
ACCT: OMA OPERATIONS & MAINT.ARMY
FORT LEWIS
TACOMA                           WA

WA-214020506 PROJECT: FTL089S018
WORK STUDY REPORTS
ACCT: OMA OPERATIONS t MAINT.ARMY
FORT LEWIS
TACOMA                           WA
       35.0  ESRO
       70.0  ESRO
       25.0  ESRO
      200.0  ESRO
       48.0  ESRE
       35.0  ESRE
                           90/09  LOW    MULTI      ADEQUATE  ADEQUATE   ADEQUATE
                                         MEDIA      DESIGN    TIMING    ESTIMATE
                           90/09  LOW    MULTI      ADEQUATE  ADEQUATE   ADEQUATE
                                         MEDIA      DESIGN    TIMING    ESTIMATE
90/09  LOW    MULTI
              MEDIA
90/09  LOW    MULTI
              MEDIA
                                                  ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
                                                  ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
                           90/09   LOW     MULTI     ADEQUATE  ADEQUATE   ADEQUATE
                                         MEDIA      DESIGN    TIMING    ESTIMATE
                           90/09   LOW    MULTI     ADEQUATE  ADEQUATE   ADEQUATE
                                        MEDIA      DESIGN    TIMING    ESTIMATE

-------
                                  FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                          DEPARTMENT  OF ARMY                      US ARMY FORCES COMMAND
                 PROJECT IDENTIFICATION
                    REQ     EST   PROJECT
  BUDGET     COMPL   COMPL   COMPL ASSESS- MEDIA
(THOUSANDS)   STATUS  DATE    DATE  MENT    TYPE
                                                                                                                     ARMY-218
  ADEQUACY OF PROJECT
ENGIN-
EERING    TIME      COST
 WA-214020506  PROJECT:  A87003
 LOGISTICS CENTER
 ACCT:  DERA -  DMA  (OPERATIONS AND MA
 FORT LEWIS
 TACOMA                          WA

 WA-214020506  PROJECT:  A87005
 LUST SITES-REMOVE CONTAMINATION
 ACCT:  DERA -  DMA  (OPERATIONS AND MA
 FORT LEWIS
 TACOMA                          WA

 WA-214020506  PROJECT:  A87006
 LANDFILL  «5
 ACCT:  DERA - OMA (OPERATIONS AND MA
 FORT LEWIS
 TACOMA                           WA

 WA-214020506 PROJECT:  FTL089S003
HAZARDOUS WASTE DISPOSAL CONTRACT
 ACCT:  OMA OPERATIONS & MAINT.ARMY
 FORT LEWIS
 TACOMA                           WA

WA-214020506 PROJECT:  FTL089S010
 UNDRGRND STORAGE TANK  SOIL CLEANUP
 ACCT: OMA OPERATIONS & MAINT.ARMY
 FORT LEWIS
TACOMA                           WA

WA-214020506 PROJECT:  FTL089S011
UNDGRND STORAGE TANK CLOSURE-YAKIMA
ACCT: OMA OPERATIONS & MAINT.ARMY
FORT LEWIS
TACOMA                           WA
      300.0   ESDF    91/10   90/09 MEDIUM   CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
      300.0   ESDF    91/10  90/09 MEDIUM   CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
    1,500.0   ESDF    92/10  90/09 MEDIUM   CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
     600.0  ESDP
      700.0  ESDP
      175.0  ESDP
                          90/09  HIGH    SOLID    ADEQUATE  ADEQUATE   ADEQUATE
                                         WASTE     DESIGN    TIMING    ESTIMATE
                          90/09  HIGH    SOLID    ADEQUATE  ADEQUATE   ADEQUATE
                                         WASTE     DESIGN    TIMING    ESTIMATE
                          90/09  HIGH    SOLID    ADEQUATE  ADEQUATE   ADEQUATE
                                         WASTE     DESIGN    TIMING    ESTIMATE

-------
                                 FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                         DEPARTMENT OF ARMY                      US ARMY FORCES COMMAND
                PROJECT IDENTIFICATION
                     REQ    EST   PROJECT
  BUDGET     COMPL   COMPL  COMPL ASSESS- MEDIA
CTHOUSANDS)  STATUS  DATE   DATE  MENT     TYPE
                                                                                                                      ARMY-219
                            ADEQUACY OF  PROJECT
                          ENGIN-
                          EERING    TIME      COST
WA-214020506 PROJECT: FTL089S012
UNDRGND STORAGE TANK CLOSURE-FORT LEWIS
ACCT: OMA OPERATIONS ft MAINT.ARMY
FORT LEWIS
TACOMA                           WA

WA-214020506 PROJECT: FTL089S013
UNDRGRND STORAGE TANK TESTING & MANAGEMENT
ACCT: OMA OPERATIONS * MAINT.ARMY
FORT LEWIS
TACOMA                           WA

WA-214020506 PROJECT: FTL089S001
HAZARDOUS WASTE PROGRAM MGT * TESTING
ACCT: OMA OPERATIONS & MAINT.ARMY
FORT LEWIS
TACOMA                           WA

WA-214020506 PROJECT: FTL089S002
HAZARDOUS MATERIALS PROGRAM MGT
ACCT: OMA OPERATIONS & MAINT.ARMY
FORT LEWIS
TACOMA                           WA

WA-214020506 PROJECT: FTL089S015
CNDCT HAZ WASTE/MTRLS SURVEY S> USAR SITES
ACCT: OMARIO&M ARMY RESERVE)
FORT LEWIS
TACOMA                           WA

WA-214020506 PROJECT: FTL089S016
UNDRGRND STRG TANK RPLCMT & CLEANUP WASTE OIL
ACCT: OMA OPERATIONS & MAINT.ARMY
FORT LEWIS
TACOMA                           WA
      825.0  ESDP
      100.0  ESDP
       50.0  ESDF
       45.0  PSDF
      225.0  PSDF
      350.0  PSDF
                           90/09  HIGH     SOLID
                                          WASTE
90/09  HIGH    SOLID
               WASTE
                           90/09 MEDIUM    SOLID
                                          WASTE
                           90/09 MEDIUM    SOLID
                                          WASTE
                           90/09 MEDIUM    SOLID
                                          WASTE
                           90/09  MEDIUM    SOLID
                                          WASTE
                        ADEQUATE  ADEQUATE    ADEQUATE
                         DESIGN    TIMING    ESTIMATE
ADEQUATE  ADEQUATE   ADEQUATE
 DESIGN    TIMING    ESTIMATE
                        ADEQUATE   ADEQUATE    ADEQUATE
                         DESIGN    TIMING     ESTIMATE
                        ADEQUATE   ADEQUATE    ADEQUATE
                         DESIGN    TIMING     ESTIMATE
                        ADEQUATE   ADEQUATE    ADEQUATE
                         DESIGN    TIMING     ESTIMATE
                        ADEQUATE   ADEQUATE    ADEQUATE
                         DESIGN    TIMING     ESTIMATE

-------
                                  FEDERAL AGENCY  POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                          DEPARTMENT OF  ARMY                      US ARMY FORCES COMMAND
                 PROJECT IDENTIFICATION
                     REQ    EST    PROJECT
  BUDGET     COMPL   COMPL   COMPL  ASSESS- MEDIA
(THOUSANDS)   STATUS  DATE    DATE   MENT    TYPE
                                                                     ARMY-220
                            ADEQUACY OF  PROJECT
                          ENGIN-
                          EERING    TIME     COST
 WA-214020506 PROJECT:  FTL089S028
 ASBSTS ABTMT (BLDG 3156,  3157)  PHASE VIII
 ACCT:  OKA OPERATIONS  & MAINT.ARMY
 FORT LEWIS
 TACOMA                          WA

 WA-214020506 PROJECT:  FTL089S029
 ASBSTS ABTMT (BLDG 3278,  3279,  3280) PH III
 ACCT:  OMA OPERATIONS  & MAINT.ARMY
 FORT LEWIS
 TACOMA                          WA

 WI-214020563 PROJECT:  FTMC89S005
 LICENSES  AND FEES
 ACCT:  OMA  OPERATIONS &  MAINT.ARMY
 FORT MCCOY
 SPARTA                           WI

 WI-214020563 PROJECT:  FTMC89S023
 PCB ASBESTOS WASTE OIL  ANALYSIS USARCS REGION 7
 ACCT: OMAR(0&M ARMY RESERVE)
 FORT MCCOY
 SPARTA                           WI

 WI-214020563  PROJECT: FTMC89S024
 PCB ASBESTOS WASTE OIL  ANALYSIS USARC'S REG 5
 ACCT: OMAR(0&M ARMY RESERVE)
 FORT MCCOY
 SPARTA                           WI

WI-214020563 PROJECT: FTMC89S008
 PCB ASBESTOS WASTE OIL  ANALYSIS - FORT MCCOY
ACCT: OMA OPERATIONS &  MAINT.ARMY
 FORT MCCOY
 SPARTA                           WI
                                                      739.0  ESDF
    1,653.0   ESDF
                           90/09 MEDIUM   TOXIC    ADEQUATE  ADEQUATE   ADEQUATE
                                       SUBSTANCE   DESIGN    TIMING    ESTIMATE
90/09 MEDIUM   TOXIC    ADEQUATE   ADEQUATE   ADEQUATE
             SUBSTANCE    DESIGN    TIMING    ESTIMATE
        4.0   ESDP    90/09   90/09  HIGH   MULTI
                                        MEDIA
        9.0   ESDP
       10.0  ESDP
       10.0  ESDP
                          90/09  HIGH   MULTI
                                        MEDIA
                          90/09  HIGH   MULTI
                                        MEDIA
                          90/09  HIGH   MULTI
                                        MEDIA
                        ADEQUATE  ADEQUATE   ADEQUATE
                         DESIGN    TIMING    ESTIMATE
                        ADEQUATE  ADEQUATE   ADEQUATE
                         DESIGN    TIMING    ESTIMATE
                        ADEQUATE  ADEQUATE   ADEQUATE
                        DESIGN    TIMING    ESTIMATE
                       ADEQUATE  ADEQUATE   ADEQUATE
                        DESIGN    TIMING    ESTIMATE

-------
                                 FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                         DEPARTMENT OF ARMY                      US ARMY FORCES COMMAND
                PROJECT IDENTIFICATION
                     REQ    EST   PROJECT
  BUDGET     COMPL   COMPL  COMPL ASSESS- MEDIA
(THOUSANDS)  STATUS  DATE   DATE  MENT    TYPE
                                                                     ARMY-221
                            ADEQUACY OF PROJECT
                          ENGIN-
                          EERING    TIME      COST
WI-214020563 PROJECT: FTMC89S006
ENVIRONMENTAL TRAINING
ACCT: DMA OPERATIONS t MAINT.ARMY
FORT MCCOY
SPARTA                           HI

WI-214020563 PROJECT: FTMC89S018
PREPARE EA'S USARC'S REGION 7
ACCT: OMARtO&M ARMY RESERVE)
FORT MCCOY
SPARTA                           MI

WI-214020563 PROJECT: FTMC89S019
PREPARE EA'S ON USARC'S REGION 5
ACCT: OMAR(04M ARMY RESERVE)
FORT MCCOY
SPARTA                           HI

WI-214020563 PROJECT: FTMC89S021
PREPARE VARIOUS FORT MCCOY EA'S
ACCT: OMA OPERATIONS t MAINT.ARMY
FORT MCCOY
SPARTA                           HI

WI-214020563 PROJECT: FTMC89S007
GROUNDWATER SAMPLING AND ANALYSIS
ACCT: OMA OPERATIONS & MAINT.ARMY
FORT MCCOY
SPARTA                           Wl

WI-214020563 PROJECT: FTMC89S009
HAZ WASTE FINGERPRINT ANALYSIS USARCS REGION 7
ACCT: OMARfO&M ARMY RESERVE)
FORT MCCOY
SPARTA                           WI
       24.0  ESDL
       28.0  OTHR
       83.0  OTHR
      110.0  OTHR
       33.0  CMPA
        5.0  ESDP
                           90/09  LOW    MULTI     ADEQUATE  ADEQUATE   ADEQUATE
                                         MEDIA      DESIGN    TIMING    ESTIMATE
90/09  LOW    MULTI     ADEQUATE  ADEQUATE    ADEQUATE
              MEDIA      DESIGN    TIMING    ESTIMATE
                           90/09   LOW    MULTI     ADEQUATE  ADEQUATE   ADEQUATE
                                        MEDIA      DESIGN    TIMING    ESTIMATE
90/09 MEDIUM  MULTI     ADEQUATE   ADEQUATE   ADEQUATE
              MEDIA      DESIGN    TIMING    ESTIMATE
90/09  HIGH    SOLID     ADEQUATE  ADEQUATE   ADEQUATE
               WASTE      DESIGN    TIMING    ESTIMATE
                           90/09  HIGH    SOLID    ADEQUATE  ADEQUATE   ADEQUATE
                                         WASTE     DESIGN    TIMING    ESTIMATE

-------
                                  FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                          DEPARTMENT OF ARMY                      US ARMY FORCES COMMAND
                 PROJECT IDENTIFICATION
                    REC3     EST   PROJECT
  BUDGET     COMPL   COMPL   COMPL ASSESS- MEDIA
(THOUSANDS)   STATUS  DATE    DATE  MENT    TYPE
                                                                                                                     ARMY-222
    ADEQUACY OF PROJECT
  ENGIN-
  EERING    TIME      COST
 WI-214020563 PROJECT:  FTMC89S010
 HAZ WASTE  FINGERPRINT  ANALYSIS USARCS REGION 5
 ACCT:  OMARtO&M ARMY  RESERVE)
 FORT MCCOY
 SPARTA                          WI

 WI-214020563 PROJECT:  FTMC89SOH
 HAZ WASTE  FINGERPRINT  ANALYSIS FORT MCCOY
 ACCT:  DMA  OPERATIONS ft MAINT,ARMY
 FORT MCCOY
 SPARTA                          WI

 WI-21402G563  PROJECT:  FTMC89S012
 HAZARDOUS WASTE DISPOSAL USARC'S REGION 5
 ACCT:  OMAR(0&M ARMY RESERVE)
 FORT MCCOY
 SPARTA                           WI
                                                        2.0  ESDP
        9.0   ESDP
       11.0   ESDP
                           90/09  HIGH    SOLID    ADEQUATE  ADEQUATE   ADEQUATE
                                         WASTE     DESIGN    TIMING    ESTIMATE
                          90/09  HIGH    SOLID    ADEQUATE  ADEQUATE   ADEQUATE
                                         WASTE     DESIGN    TIMING    ESTIMATE
                          90/09  HIGH    SOLID    ADEQUATE  ADEQUATE   ADEQUATE
                                         WASTE     DESIGN    TIMING    ESTIMATE
WI-214020563 PROJECT: FTMC99S004
HAZ WATE DISPOSAL USARC'S REGION 7
ACCT: OMAR(0&M ARMY RESERVE)
FORT MCCOY
SPARTA                           WI

WI-214020563 PROJECT: FTMC000009
CLOSE EXISTING SOLID WASTE LANDFILL
ACCT: DMA OPERATIONS & MAINT.ARMY
FORT MCCOY
SPARTA                           WI

WI-214020563 PROJECT: FTMC000010
LEAKING UNDERGROUND STORAGE TANKS-REMEDIAL
ACCT: DMA OPERATIONS & MAINT.ARMY
FORT MCCOY
SPARTA                           WI
       10.0   ESDP
                          90/09  HIGH
                                         SOLID
                                         WASTE
       20.0  ESDP   90/09  90/09  HIGH    SOLID
                                         WASTE
      100.0  ESDF   92/09  90/09 MEDIUM   SOLID
                                         WASTE
ADEQUATE  ADEQUATE
 DESIGN    TIMING
ADEQUATE
ESTIMATE
ADEQUATE  ADEQUATE   ADEQUATE
 DESIGN    TIMING    ESTIMATE
ADEQUATE  ADEQUATE   ADEQUATE
 DESIGN    TIMING    ESTIMATE

-------
                                 FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR  FISCAL YEAR  1991

                         DEPARTMENT OF ARMY                      US ARMY FORCES  COMMAND
                PROJECT IDENTIFICATION
                     REQ    EST   PROJECT
  BUDGET     COMPL   COMPL  COMPL ASSESS- MEDIA
(THOUSANDS)   STATUS  DATE   DATE   MENT    TYPE
                                                                                                                     ARMY-223
             ADEQUACY OF PROJECT
           ENGIN-
           EERING    TIME      COST
WI-214020563 PROJECT: FTMC000016
TEST UNDERGROUND TANKS-USARC1S EPA REG.  7
ACCT: OMAR(0*M ARMY RESERVE)
FORT MCCOY
SPARTA                           HI

WI-214020563 PROJECT: FTMC000017
TEST UNDERGROUND TANKS - USARC'S EPA REG. 5
ACCT: OMARIOtM ARMY RESERVE)
FORT MCCOY
SPARTA                           WI
       10.0  ESDF   89/12  90/09 MEDIUM
       33.0  ESDF   39/12  90/09 MEDIUM
SOLID    ADEQUATE  ADEQUATE   ADEQUATE
WASTE     DESIGN    TIMING    ESTIMATE
SOLID    ADEQUATE  ADEQUATE   ADEQUATE
WASTE     DESIGN    TIMING    ESTIMATE
WI-214020563 PROJECT: FTMC000020
TEST UST'S - FORT MCCOY
ACCT: OMA OPERATIONS & MAINT.ARMY
FORT MCCOY
SPARTA                           WI
       50.0  ESDF   92/12  90/09  MEDIUM
                                          SOLID
                                          WASTE
         ADEQUATE  ADEQUATE
          DESIGN    TIMING
ADEQUATE
ESTIMATE
WI-214020563 PROJECT: FTMC000022
REMEDIAL ACTIONS - LEAKING UST'S USARC'S REG5
ACCT: OMAR(0AM ARMY RESERVE)
FORT MCCOY
SPARTA                           WI

WI-214020563 PROJECT: FTMC000023
REMEDIAL ACTIONS - LEAKING UST'S USARC'S REG7
ACCT: OMAR(0&M ARMY RESERVE)
FORT MCCOY
SPARTA                           WI

WI-214020563 PROJECT: FTMC000002
CONSTRUCT/DESIGN FIRE TRAINING FACILITY
ACCT: OMA OPERATIONS & MAINT,ARMY
FORT MCCOY
SPARTA                           WI
                                                      150.0  ESDF    91/09   90/09 MEDIUM
       50.0  ESDF   91/09  90/09  MEDIUM
      100.0  PSDF
                           90/09  MEDIUM
                                         SOLID    ADEQUATE  ADEQUATE   ADEQUATE
                                         WASTE     DESIGN    TIMING    ESTIMATE
                                         SOLID    ADEQUATE  ADEQUATE   ADEQUATE
                                         WASTE     DESIGN    TIMING    ESTIMATE
                                         SOLID    ADEQUATE  ADEQUATE   ADEQUATE
                                         WASTE     DESIGN    TIMING    ESTIMATE

-------
                                  FEDERAL AGENCY POLLUTfON ABATEMENT PLAN FOR FISCAL YEAR 1991

                          DEPARTMENT  OF ARMY                      US ARMY FORCES COMMAND
                 PROJECT IDENTIFICATION
                     REQ     EST    PROJECT
  BUDGET     COMPL   COMPL   COMPL  ASSESS- MEDIA
(THOUSANDS)   STATUS   DATE    DATE   MENT    TYPE
                                                                                                                      ARMY-224
                            ADEQUACY OF  PROJECT
                          ENGIN-
                          EERING    TIME      COST
 WI-214020563 PROJECT:  FTMC89S051
 DESIGN/CONSTRUCT  RECYCLING  FACILITY FORT MCCOY
 ACCT:  OMA  OPERATIONS  & MAINT.ARMY
 FORT MCCOY
 SPARTA                          HI

 WI-214020563 PROJECT:  FTMC89S003
 HAZARDOUS  WASTE DISPOSAL FORT MCCOY
 ACCT:  OMA  OPERATIONS  4 MAINT.ARMY
 FORT MCCOY
 SPARTA                           HI

 WI-214020563  PROJECT:  FTMC000025
 FORT MCCOY ASBESTOS REMOVAL
 ACCT: OMA OPERATIONS & MAINT.ARMY
 FORT MCCOY
 SPARTA                           WI

WI-214020563  PROJECT: FTMCOO"0006
CONSTRUCT VEHICLE WASH FACILITY
ACCT: MILCON.ARMY (MCA)
FORT MCCOY
SPARTA                           WI

WI-214020563  PROJECT: FTMC89S013
PURCHASE SPILL RESPONSE EQUIPMENT - FORT MCCOY
ACCT: OMA OPERATIONS & MAINT.ARMY
FORT MCCOY
SPARTA                           WI

WI-214020563  PROJECT: FTMC89S050
TRAINING LAKE DESIGN/CONSTRUCTION
ACCT: OMA OPERATIONS & MAINT.ARMY
FORT MCCOY
SPARTA                           WI
                                                      195.0  ESDL
        8.0   OTHR
      200.0   ESDF
    5,900.0   ESDP
        2.0   ESDF
      195.0  OTHR
                           90/09   LOW     SOLID    ADEQUATE  ADEQUATE   ADEQUATE
                                         WASTE     DESIGN    TIMING    ESTIMATE
                           90/09   LOW     SOLID    ADEQUATE  ADEQUATE   ADEQUATE
                                         WASTE     DESIGN    TIMING    ESTIMATE
                           90/09 MEDIUM   TOXIC    ADEQUATE  ADEQUATE   ADEQUATE
                                       SUBSTANCE   DESIGN    TIMING    ESTIMATE
90/09 MEDIUM   WATER    ADEQUATE  ADEQUATE    ADEQUATE
                         DESIGN    TIMING    ESTIMATE
90/09 MEDIUM   WATER
                          90/09  LOW     WATER
                                                  ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
                                                  ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE

-------
                           FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991                         ARMY-225

                   DEPARTMENT OF ARMY                      US ARMY FORCES COMMAND

                                                               RE<3    EST   PROJECT              ADEQUACY  OF  PROJECT
          PROJECT IDENTIFICATION            BUDGET     COMPL   COMPL  COMPL ASSESS- MEDIA      ENGIN-
                                          (THOUSANDS)  STATUS  DATE   DATE  MENT    TYPE       EERING    TIME     COST


TOTAL, US ARMY FORCES COMMAND                           92,560.0                     432

-------
                                  FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                          DEPARTMENT  OF ARMY                      US ARMY WESTERN COMMAND
                 PROJECT IDENTIFICATION
                     REQ     EST   PROJECT
  BUDGET     COMPL    COMPL   COMPL ASSESS- MEDIA
(THOUSANDS)   STATUS   DATE    DATE  MENT    TYPE
                                                                                                                     ARMY-226
  ADEQUACY OF PROJECT
ENGIN-
EERING    TIME      COST
 HI-214522199 PROJECT:  ALM089S001
 CONDUCT CONTAMINATION  SURVEY  OF T-88 TUNNEL
 ACCT:  DERA - DMA  (OPERATIONS  AND MA
 ALIAMANU MIL RES
 FORT SHAFTER                    HI

 HI-214522199 PROJECT:  ALM089S002
 CONDUCT CONTAMINATION  SURVEY  OF AMR TUNNELS
 ACCT:  DERA - DMA  (OPERATIONS  AND MA
 ALIAMANU MIL RES
 FORT SHAFTER                    HI

 HI-214522234 PROJECT:  POTA89S001
 CONDUCT  CONTAMINATION  SURVEY  OF PTA LANDFILL
 ACCT: DERA  -  DMA  (OPERATIONS  AND MA
 POHAKULOA  TNG AREA
 FORT SHAFTER                     HI

HI-214522239  PROJECT:  SB0089S001
DRILL MONITORING WELLS AT SB  LANDFILL
ACCT: DERA  -  DMA  (OPERATIONS  AND MA
 SCHOFIELD BARRACKS MIL RES
 FORT SHAFTER                     HI

HI-214522239  PROJECT:  AP 88-001
TOXICITY TESTING - SCHOFIELD BARRACKS
ACCT: OMA OPERATIONS & MAINT.ARMY
SCHOFIELD BARRACKS MIL RES
FORT SHAFTER                     HI

HI-21<+539598  PROJECT: WES089S002
CONDCUCT PCB TRANSFORMER SURVEY
ACCT: OMA OPERATIONS & MAINT.ARMY
HQ WESTERN  COMMAND
FORT SHAFTER                     HI
                                                      100.0  ESDL
      250.0   ESDL
      200.0   ESDL
      250.0   ESDL
       20.0   ESDF
      100.0   ESDL
                           90/12   LOW     CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
                           90/12   LOW     CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
                          90/12  LOW     CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
                          91/03  LOW     CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
                          90/09 MEDIUM   WATER
                                                  ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
                          90/09  LOW     TOXIC    ADEQUATE  ADEQUATE   ADEQUATE
                                       SUBSTANCE   DESIGN    TIMING    ESTIMATE

-------
                           FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR  FISCAL YEAR  1991                         ARMY-227

                   DEPARTMENT OF ARMY                      US ARMY WESTERN COMMAND

                                                               REQ   EST   PROJECT             ADEQUACY OF PROJECT
          PROJECT IDENTIFICATION            BUDGET     COMPL   COMPL COMPL ASSESS- MEDIA      ENGIN-
                                          (THOUSANDS)  STATUS  DATE  DATE  MENT    TYPE       EERING    TIME      COST


TOTAL, US ARMY WESTERN COMMAND                             920.0                       6

-------
                                  FEDERAL AGENCY POLLUTION ABATEMENT  PLAN FOR  FISCAL  YEAR  1991

                          DEPARTMENT OF ARMY                      US  MILITARY  ACADEMY
                 PROJECT IDENTIFICATION
                     REQ    EST   PROJECT
  BUDGET     COMPL   COMPL   COMPL  ASSESS-  MEDIA
(THOUSANDS)   STATUS  DATE    DATE   MENT     TYPE
                                                                     ARMY-223
    ADEQUACY OF PROJECT
  ENGIN-
  EERING    TIME      COST
 NY-214620915 PROJECT:  MAS8-005
 REMOVE OIL CONTAMINATED  SOIL
 ACCT:  OMA OPERATIONS 4 MAINT,ARMY
 WEST POINT MILITARY RESERVN
 NEWBURGH                         NY

 NY-214620915 PROJECT:  MAS-8-007
 SEAL CLOSED  SWMU'S
 ACCT:  MILCON,ARMY (MCA)
 WEST POINT MILITARY RESERVN
 NEW3URGH                         NY

 NY-214620915  PROJECT:  MA8S-004
 INSTALL PACKAGE WASTE  WATER  TREATMENT PLANT
 ACCT: MILCQN,ARMY (MCA)
 WEST POINT MILITARY  RESERVN
 NEWBURGH                         NY

NY-214620915  PROJECT:  MAS8-009
 CONNECT YOUTH CAMP SEPTIC SYTM TO SEWAGE
ACCT: OM.A OPERATIONS 4 HAINT,ARMY
WEST POINT MILITARY  RESERVN
NEWBURGH                         NY

*     TOTAL,  US MILITARY ACADEMY
       50.0   PSDF
                           90/09   HIGH
      300.0   ESOF    92/11   90/09  HIGH
      700.0   PSDF
      60.0  PSDF
                                          SOLID
                                          WASTE
                                         WATER
                           90/09 MEDIUM   WATER
                          90/09 MEDIUM   HATER
ADEQUATE  ADEQUATE   ADEQUATE
 DESIGN    TIMING    ESTIMATE
                                                  ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
                                                  ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
                                                  ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
              1,110,0
      TOTAL, DEPARTMENT OF ARMY
            582,413.0
                                                                                          1273

-------
USAF

-------
DEPARTMENT OF
  AIR FORCE

-------
                                                       USAF-1
THE UNITED STATES AIR FORCE

The United States Air Force (USAF) owns approximately 1,886
installations in the United States comprising about 8 million
acres.   They also own 95,515 buildings containing about 561
million square feet of floor space. In addition to the property
held within the geographic boundaries of the country, USAF also
owns about 26 thousand acres in outlying areas of the U. S.

AGENCY POLLUTION ABATEMENT PLAN FOR FY 1991

The USAF proposed 362 projects totalling $243 million in their A-
106 environmental plan for FY 1991.

Reflecting the relative number of facilities contained in the
different commands within USAF, the Air Force Logistics Command
contributed the largest number of projects to the environmental
plan, with 113, totalling $63 million.  The Strategic Air Command
was next with 81 projects, totalling $57 million.  The Military
Airlift Command submitted 33 projects, for a total of $50
million; the Alaskan Air Command submitted 19 projects, for a
total of $26 million; the Air Force Systems Command submitted 49
projects, totalling $20 million. The Air National Guard submitted
11 projects, totalling $13 million; and six other commands
submitted 56 projects, totalling $15 million.

EPA evaluated the 362 projects according to the impact on the
local environment that would result if the projects were not
funded in FY 1991.  EPA rated 180 projects (budgeted at $176
million) as having a "High" environmental impact.  "Medium"
ratings were assigned to 145 projects ($53 million) and "Low"
ratings to 37 projects ($15 million).

The distribution of projects across compliance classes for USAF
indicates that there are 69 Class I projects, those in the plan
for current compliance reasons, or 19 percent of the total number
of projects in the FY 1991 plan.  The 151 Class II projects,
those in the plan to permit the agency to meet near-term future
compliance deadlines, make up 42 percent of the total; and the
142 Class III projects, those in the plan for other environmental
reasons, make up 39 percent of the total.

The 362 projects proposed by USAF in their FY 1991 plan are
distributed across the various environmental media programs in
the following pattern:  139 projects in the CERCLA area, costing
$151 million; another 90 projects in the RCRA area, costing $26
million; plus 81 projects in the water and drinking water area,
costing $48 million.   Additionally, the agency proposed 36 air
projects, costing $12 million; and another 16 projects in the
toxics  area,  costing $6 million.

-------
                                                                         USAF-2
                       TOTAL NUMBER OF POLLUTION ABATEMENT

                         PROJECTS PROPOSED FOR FY 1987 - 91

                                 US AIR FORCE
      400-
 (0

 s
 UJ

 o
 DC
 D.

 u.
 O

 DC
 UJ
 ffi

 D
      300-
USAFFK31
                                                                    FY91

-------
                                                                                       USAF-3
                          TOTAL DOLLARS REQUESTED FOR POLLUTION

                           ABATEMENT PROJECTS FOR FY 1987 - 91

                                    US AIR FORCE
     300000
     200000
o
o
o
c



0
Q
     100000
   USAFFK32
                                                                            FY91

-------
   MAJOR
   COMMAND
    PACIFIC AIR FORCES
    AIR FORCE ACADEMY
   AIR NATIONAL GUARD
     ALASKAN AIR CMD
     TACTICAL AIR CMD
        AIR FORCE CMD
TOTAL NUMBER AND DOLLARS PROPOSED FOR
 POLLUTION ABATEMENT NEEDS FOR FY 1991
            US AIR FORCE
                                            100
                          1000
10000
100000       1000000
USAF FIG 3A
(CONT'D ON USAF 3B)
                      PROJ ECTS

                      DOLLARS ($000)

-------
                                                                                                     USAF-5
MAJOR
COMMAND
   STRATEGIC AIR CMD
     MILITARY AIRLIFT
       LOGISTICS CMD
       AIR UNIVERSITY
     AIR TRAINING CMD
        RESERVE CMD
TOTAL NUMBER AND DOLLARS PROPOSED FOR
 POLLUTION ABATEMENT NEEDS FOR FY 1991
            US AIR FORCE
                                                          1000          10000        100000       1000000
  USAF FIG 3B
  (CONT'D FRPM USAF FIG 3A)
                  PROJECTS

                  DOLLARS ($000)

-------
                                                                                        USAF-6
                          TOTAL NUMBER AND DOLLARS PROPOSED FOR
                             CLASS I, II, III PROJECTS FOR FY 1991
                                    US AIR FORCE
      CLASS I
      CLASS II
      CLASS III
                          100
 1000
10000
100000
1000000
USAFFIG4
PROJECTS

DOLLARS ($000)

-------
                                                                                   USAF-7
   USAF - TABLE 1: EPA EVALUATION OF THE ENVIRONMENTAL IMPACT OF PROPOSED
                   POLLUTION ABATEMENT PROJECTS FOR FISCAL YEAR 1991
                   INCLUDING NUMBER AND COST
                         DEPARTMENT OF AIR FORCE
COMPLIANCE *
STATUS

CMPA
INOV
ESDP
ESDF
PSDF
ESRO
ESRE
ESDL
OTHR
GRAND TOTAL
HIGH
PROJECTS
COST
($1,000)
14
21,125.0
3
3,077.9
36
19,836.0
72
105,809.1
16
11,975.3
1
850.0
2
20.0
8
4,054.5
28
6,275.1
180
176,022.9
MEDIUM
PROJECTS
COST
($1,000)
0
0.0
0
0.0
13
4,257.9
44
17,974.2
14
7,388.0
16
2,917.8
0
0.0
19
2,682.9
39
17,232.5
145
52,453.3
LOW
PROJECTS
COST
($1,000)
1
4,500.0
0
0.0
2
4.0
4
810.0
1
15.0
6
1,631.3
0
0.0
12
4,717.4
11
3,121.2
37
14,798.9
TOTAL
PROJECTS
COST
($1,000)
15
25,625.0
3
3,077.9
51
24,097.9
120
127,593.3
31
19,378.3
23
5,399.1
2
20.0
39
11,454.8
78
26,628.8
362
243,275.1
*  SEE SECTION III FOR  DEFINITIONS OF COMPLIANCE STATUS CATEGORIES

-------
       USAF -  TABLE 2:  NUMBER AND DOLLAR AMOUNT OF POLLUTION ABATEMENT PROJECTS FOR FEDERAL INSTALLATIONS
                         PROPOSED BY MAJOR COMMAND/BUREAU FOR FISCAL YEAR 1991 BY CLASS/COMPLIANCE STATUS.*

                                         DEPARTMENT OF AIR FORCE
                                                                                                                          USAF-8
MAJOR COMMAND/
BUREAU CMPA
PROJECTS
COST
($1,000)
RESERVE COM
AIR TRAINING
COM
AIR
UNIVERSITY
LOGISTICS 9
COM 8,625.0
MILITARY 1
AIRLIFT 12,000.0
STRATEGIC 2
AIR COM 4,650.0
AIR FORCE 3
SYS COM 350.0
TACTICAL
AIR COM
ALASKAN AIR
COM
AIR NATL
GUARD
AIR FORCE
ACADEMY
PACIFIC AIR
FORCES
TOTAL 15
25,625.0
CLASS I
INOV ESDP
PROJECTS PROJECTS
COST COST
($1,000) (91,000)

	
5
976.0
	
1
47.0
15
11,106.9
1 5
260.9 1,745.0
5
2,219.0
12
4,436.0

1 9
2,750.0 3,615.0



3 51
3,077.9 24,097.9
CLASS
ESDF
PROJECTS
COST
($1,000)

6
3,832.0
2
150.0
11
27,750.0
7
23,250.0
	 	 ____
48
34,640.2
	 	 	
12
4,038.1
14
1,858.0
8
17,280.0
9
12,255.0
1
500.0
2
2,040.0
	
120
127,593.3
II
PSDF
PROJECTS
COST
($1,000)
1
25.0
4
2,450.0

	 	
8
652.0
	 	 	 	 	
12
11,236.0
3
2 , 736 . 0
1
2,000.0
	
1
140.0
	

	
1
139.3
	
31
19,378.3
ESRO
PROJECTS
COST
($1,000)
1
350.0


6
1,654.9

12
1,912.2
1
432.0
2
200.0

1
850.0


23
5,399.1
CLASS III
ESRE ESDL
PROJECTS PROJECTS
COST COST
($1,000) ($1,000)

4
37.7
1
100.0
2 16
20.0 1,427.5
5
1,636.4
3
4,100.0
10
4,153.2





2 39
20.0 11,454.8
OTHR
PROJECTS
COST
($1,000)

3 .
49.0

46
11,297.1
	
2
54.0
	 	 	 	
8
6,964.5
10
4,054.2
.__-______
3
500.0
1
1,850.0
1
60.0
4
1,800.0
	
78
26,628.8
TOTAL
PROJECTS
COST
($1,000)
2
375.0
22
7,344.7
__-_
4
297.0
113
62,533.4
33
50,202.3
81
57,221.9
49
19,463.5
'20
2,698.0
19
25,495.0
11
13,165.0
5
2,300.0
3
2,179.3
362
243,275.1
* SEE SECTION III FOR DEFINITIONS OF COMPLIANCE STATUS CATEGORIES

-------
USAF - TABLE 3: NUMBER AND DOLLAR AMOUNT OF  POLLUTION ABATEMENT  PROJECTS  PROPOSED  BY
                MAJOR COMMAND/BUREAU AND ENVIRONMENTAL  MEDIA  FOR FISCAL YEAR  1991

                                DEPARTMENT OF AIR FORCE
                                                                                                        USAF-9
MAJOR COMMAND/
BUREAU AIR

RESERVE COM
AIR TRAINING
COM
AIR
UNIVERSITY
LOGISTICS
COM
MILITARY
AIRLIFT
STRATEGIC
AIR COM
AIR FORCE
SYS COM
TACTICAL
AIR COM
ALASKAN AIR
COM
AIR NATL
GUARD
AIR FORCE
ACADEMY
PACIFIC AIR
FORCES
TOTAL
PROJECTS
COST
($1,000)



16
6347.0
2
400.0
5
2151.7
9
2381.1
2
325.0
1
80.0

1
500.0

36
12184.8
DRINKING
MATER
PROJECTS
COST
($1,000)



6
179.6

1
66.6
1
52.0


1
850.0


9
1148.2
NOISE PESTICIDES RADIATION CERCLA
PROJECTS PROJECTS PROJECTS PROJECTS
COST COST COST COST
($1,000) ($1,000) ($1,000) ($1,000)

7
5150.0
2
200.0
24
42915.0
15
33600.0
37
37594.0
20
7750.1
10
1300.0
13
8200.0
8
12125.0
1
500.0
2
2040.0
139
151374.1
RCRA
PROJECTS
COST
($1,000)
2
375.0
13
2122.7
2
97.0
40
9307.1
7
974.0
12
7208.4
4
1912.7
6
733.0
1
1850.0

2
800.0
1
139.3
90
25519.2
TSCA
PROJECTS
COST
($1,000)



7
1486.9
ieeot*
2
209.7
4
2660.0



1
500.0

16
6137.5
HATER
PROJECTS
COST
($1,000)

2
72.0

20
2297.8
7
13947.4
24
9991.5
11
4707.6
2
340.0
4
15365.0
2
190.0


72
46911.3
MULTI TOTAL
PROJECTS PROJECTS
COST COST
($1,000) ($1,000)
2
375.0
22
7344.7
4
297.0
113
62533.4
33
50202.3
SI
57221.9
49
19463.5
20
2698.0
19
25495.0
11
13165.0
5
2300.0
3
2179.3
362
243275.1

-------
                                 FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                         DEPARTMENT OF AIR FORCE                 RESERVE COMMAND
                PROJECT IDENTIFICATION
                     REQ    EST   PROJECT
  BUDGET     COMPL   COMPL  COMPL  ASSESS- MEDIA
(THOUSANDS)   STATUS  DATE    DATE   MENT    TYPE
                                                                                                                     USAF-10
  ADEQUACY OF PROJECT
ENGIN-
EERING    TIME      COST
MO-571224292 PROJECT: AF-025C
FIREMAN TRAINING FACILITY
ACCT: MILCON, RSV FORCE
RICHARDS-GEBAUR AFB
RICHARDS-GEBAUR AFB              MO

NY-571224273 PROJECT: AF-141H
HAZARDOUS HASTE TESTING
ACCT: 0 i M, RSV FORCE
914TH TACTICAL AIRLIFT GROUP
NIAGARA FALLS                    NY
                                                      350.0  ESRO
       35.0   PSDF
                           90/10   LOW     SOLID    ADEQUATE  ADEQUATE   ADEQUATE
                                         WASTE     DESIGN    TIMING    ESTIMATE
                           90/09   HIGH    SOLID    ADEQUATE  ADEQUATE   ADEQUATE
                                         WASTE     DESIGN    TIMING    ESTIMATE
      TOTAL, RESERVE COMMAND
                 375.0

-------
                                 FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR  1991

                         DEPARTMENT OF AIR FORCE                 AIR TRAINING COMMAND
                PROJECT IDENTIFICATION
                                    REQ    EST   PROJECT
                 BUDGET     COMPL   COMPL  COMPL ASSESS-  MEDIA
               (THOUSANDS)  STATUS  DATE   DATE   MENT     TYPE
                                                                                                                     USAF-11
                            ADEQUACY  OF  PROJECT
                          ENGIN-
                          EERING    TIME     COST
AZ-571524582 PROJECT: AF-128B
IRP RI/FS
ACCT: DERA
WILLIAMS AFB
CHANDLER
                   1,250.0  PSDF
90/09 MEDIUM   CERCLA   ADEQUATE   ADEQUATE   ADEQUATE
                         DESIGN    TIMING    ESTIMATE
CA-571524143 PROJECT: AF-075B
IRP RI/FS.
ACCT: DERA
MATHER AFB
SACRAMENTO

CA-571524143 PROJECT: AF-058R
LABORATORY CONTRACT
ACCT: 0 ft M
MATHER AFB
SACRAMENTO

CA-571524143 PROJECT: AF-058S
ANNUAL UST TESTING
ACCT: 0 & M
MATHER AFB
SACRAMENTO
AZ
AZ-571524582 PROJECT: AF-0270
INSTALL INDUSTRIAL PRETREATMENT
ACCT: 0 ft M
WILLIAMS AFB
CHANDLER                         AZ
AZ-571524582 PROJECT: AF-027K
REPAIR SEWAGE PLANT
ACCT: 0 t M
WILLIAMS AFB
CHANDLER
                                 AZ
CA
CA
CA
                      18.0  ESDP   87/11   90/09 MEDIUM   WATER     ADEQUATE  ADEQUATE   ADEQUATE
                                                                  DESIGN    TIMING    ESTIMATE
                      54.0  ESDP   85/12  90/09  HIGH    WATER    ADEQUATE  ADEQUATE   ADEQUATE
                                                                  DESIGN    TIMING    ESTIMATE
                                                      200.0  PSDF
                     200.0  PSDF
                      25.0  ESDL
                                          90/09 MEDIUM   CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
                                                                  DESIGN    TIMING    ESTIMATE
90/09  HIGH    SOLID     ADEQUATE  ADEQUATE   ADEQUATE
               WASTE      DESIGN    TIMING    ESTIMATE
                                          90/09  HIGH    SOLID    ADEQUATE  ADEQUATE   ADEQUATE
                                                        WASTE     DESIGN    TIMING    ESTIMATE

-------
                                  FEDERAL ASENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                          DEPARTMENT OF AIR FORCE                 AIR TRAINING COMMAND
                 PROJECT  IDENTIFICATION
                     REQ     EST    PROJECT
  BUDGET     COMPL   COMPL   COMPL  ASSESS- MEDIA
(THOUSANDS)   STATUS   DATE    DATE   MENT    TYPE
                                                                                                                     USAF-12
                            ADEQUACY  OF  PROJECT
                          ENGIN-
                          EERING    TIME     COST
 CA-571524143 PROJECT:  AF-058M
 SOLVENT  RENTAL.
 ACCT:  0  &  M
 MATHER AFB
 SACRAMENTO                      CA

 IL-571524157 PROJECT:  AF-042C
 IRP  RI/FS
 ACCT:  DERA
 CHANUTE          AFB
 RANTOUL                          IL

 IL-571524157 PROJECT:  AF-012N
 RENTAL SOLVENT
 ACCT:  0  &  M
 CHANUTE          AFB
 RANTOUL                          IL

 MS-57152-+060  PROJECT:  AF-043B
 IRP RI/FS
 ACCT:  DERA
 COLUMBUS AFB
 COLUMBUS                         MS

 MS-571524060  PROJECT:  AF-052K
 SOLVENT RENTAL
 ACCT:  0 * M
 COLUMBUS AFB
 COLUMBUS                         MS

 MS-571524164  PROJECT:  AF-45B
 IRP RI/FS
ACCT: DERA
KEESLER          AFB
BILOXI                           MS
                                                        3.5  ESDL
    1,800.0   ESDF
        7.2   ESDL
                           90/09   LOW     SOLID    ADEQUATE  ADEQUATE   ADEQUATE
                                         WASTE     DESIGN    TIMING    ESTIMATE
90/09 MEDIUM   CERCLA     NOT
                         AVAIL
 NOT
AVAIL
        2.0   ESDL
 NOT
AVAIL
90/09  LOW     SOLID    ADEQUATE   ADEQUATE   ADEQUATE
               WASTE     DESIGN    TIMING    ESTIMATE
      500.0   ESDF    91/06   90/09 MEDIUM   CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
90/09  LOW     SOLID    ADEQUATE  ADEQUATE    ADEQUATE
               WASTE     DESIGN    TIMING    ESTIMATE
      800.0   PSDF    91/06   90/09 MEDIUM   CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE

-------
                                  FEDERAL AGENCY  POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                         DEPARTMENT OF AIR FORCE                 AIR TRAINING COMMAND
                PROJECT IDENTIFICATION
                                                                     REQ    EST   PROJECT
                                                  BUDGET     COMPL   COMPL  COMPL ASSESS- MEDIA
                                                (THOUSANDS)  STATUS  DATE   DATE  MENT    TYPE
                                                                                                                      USAF-13
                            ADEQUACY OF PROJECT
                          ENGIN-
                          EERING    TIME      COST
OK-571524095 PROJECT: AF-053C
RI/FS
ACCT: DERA
VANCE AFB
ENID

OK-571524095 PROJECT: AF-063BB
BEAD BLAST EQPT
ACCT: MILCON
VANCE AFB
ENID

TX-571524071 PROJECT: AF-053M
SOLVENT RENTAL
ACCT: 0 4 M
GOODFELLOW AFB
SAN ANGELO
             PROJECT: AF-051B
TX-571524091
IRP RI/FS
ACCT: DERA
REESE AFB
LUBBOCK
TX-571524091 PROJECT: AF-061N
SOLVENT RENTAL
ACCT: 0 4 M
REESE AFB
LUBBOCK

TX-571524105 PROJECT: AF-056H
SOLVENT RENTAL
ACCT: 0 4 M
LAUGHLIN AFB
DEL RIO
                                 OK
                                 OK
                                 TX
                                 TX
                                 TX
                                 TX
                                                      200.0  ESDF
                                                      930.0  ESDF
                                                        2.0  ESDP
                                                      400.0  ESDF
                                                        2.0  ESDF
                                                        2.0  OTHR
                                                                           90/09 MEDIUM   CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
                                                                                                    DESIGN    TIMING    ESTIMATE
90/10  HISH    SOLID    ADEQUATE  ADEQUATE   ADEQUATE
               WASTE     DESIGN    TIMING    ESTIMATE
90/09  LOW     SOLID    ADEQUATE  ADEQUATE    ADEQUATE
               WASTE     DESIGN    TIMING    ESTIMATE
90/09 MEDIUM   CERCLA   ADEQUATE  ADEQUATE    ADEQUATE
                         DESIGN    TIMING    ESTIMATE
90/09  LOW     SOLID    ADEQUATE   ADEQUATE    ADEQUATE
               WASTE     DESIGN    TIMING     ESTIMATE
                                                                           90/09  LOW     SOLID    ADEQUATE  ADEQUATE    ADEQUATE
                                                                                          WASTE     DESIGN    TIMING    ESTIMATE

-------
                                 FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                         DEPARTMENT OF AIR FORCE                 AIR TRAINING COMMAND
                 PROJECT  IDENTIFICATION
                     REQ    EST   PROJECT
  BUDGET     COMPL   COMPL  COMPL ASSESS-  MEDIA
(THOUSANDS)   STATUS  DATE    DATE   MENT     TYPE
                                                                                                                      USAF-14
    ADEQUACY OF PROJECT
  ENGIN-
  EERING    TIME      COST
TX-571524117  PROJECT: AF-060H
SOLVENT RENTAL.
ACCTi 0 4 M
RANDOLPH         AFB
SAN ANTONIO                      TX

TX-571524129  PROJECT: AF-055R
RENTAL SOLVENT.
ACCT: 0 S, M
LACKLAND AFB
SAN ANTONIO                      TX

TX-571524161  PROJECT: AF-062M
BEAD BLAST EQPT
ACCT: MILCON
SHEPPARD AFB
WICHITA FALLS                    TX

TX-57152-+161  PROJECT: AF-062K
SOLVENT RENTAL.
ACCT: 0 * M
SHEPPARD AFB
WICHITA FALLS                    TX
                                                       22.0  OTHR
       25.0   OTHR
                           90/09  LOW      SOLID    ADEQUATE  ADEQUATE   ADEQUATE
                                          WASTE     DESIGN    TIMING    ESTIMATE
                           90/09   LOW      SOLID    ADEQUATE  ADEQUATE   ADEQUATE
                                          WASTE     DESIGN    TIMING    ESTIMATE
      900.0   ESDP   87/08   90/09  MEDIUM    SOLID
                                          WASTE
        2.0   ESDP   87/08   90/09   LOW
ADEQUATE  ADEQUATE   ADEQUATE
 DESIGN    TIMING    ESTIMATE
                                          SOLID    ADEQUATE  ADEQUATE   ADEQUATE
                                          WASTE     DESIGN    TIMING    ESTIMATE
      TOTAL, AIR TRAINING COMMAND
               7,34<*. 7
                                                                                            22

-------
                                 FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR  1991

                         DEPARTMENT OF AIR FORCE                 AIR UNIVERSITY
                PROJECT IDENTIFICATION
                     REQ    EST   PROJECT
  BUDGET     COMPL   COMPL  COMPL  ASSESS- MEDIA
(THOUSANDS)  STATUS  DATE   DATE   MENT    TYPE
                                                                                                                     USAF-15
                            ADEQUACY  OF  PROJECT
                          ENGIN-
                          EERING   TIME      COST
AL-571624182 PROJECT: AF-049B
IRP RI/FS
ACCT: DERA
MAXWELL AFB
MONTGOMERY                       AL

AL-571624182 PROJECT: AF-049I
LONG TERM MONITORING
ACCT: 0 & M
MAXWELL AFB
MONTGOMERY                       AL

AL-571624182 PROJECT: AF-010F
BASE SERVICE STATION
ACCT: DERA
MAXWELL AFB
MONTGOMERY                       AL

AL-571624182 PROJECT: AF-010E
CONSTRUCT HAZARDOUS WASTE STORAGE AREA
ACCT: 0 4 M
MAXWELL AFB
MONTGOMERY                       AL
      100.0  ESDF   90/06   90/09   HIGH    CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
      100.0  ESDL
       47.0  INOV
       50.0  ESDF
                           90/09  HIGH    CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
90/09  HIGH    SOLID    ADEQUATE   ADEQUATE   ADEQUATE
               WASTE     DESIGN    TIMING    ESTIMATE
90/09  HIGH
                                         SOLID
                                         WASTE
                        ADEQUATE  ADEQUATE   ADEQUATE
                         DESIGN   TIMING    ESTIMATE
      TOTAL, AIR UNIVERSITY
                 297.0

-------
                                  FEDERAL  AGENCY  POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                          DEPARTMENT  OF  AIR  FORCE                AIR FORCE LOGISTICS COMMAND
                 PROJECT IDENTIFICATION
                                    REQ    EST   PROJECT
                 BUDGET     COMPL   COMPL  COMPL ASSESS- MEDIA
                (THOUSANDS)  STATUS  DATE   DATE  MENT    TYPE
                                                                                     USAF-16
  ADEQUACY OF PROJECT
ENGIN-
EERING    TIME      COST
 CA-571724337 PROJECT:  AF-028R
 AIR MONITORING
 ACCT:  0 4 M
 MCCLELLAN AIR FORCE  BASE
 MCCLELLAN AFB                   CA

 CA-571724337 PROJECT:  AF-028U
 ASBESTOS CONTRACT MANNING
 ACCT:  0 i, M
 MCCLELLAN AIR  FORCE  BASE
 MCCLELLAN AFB                    CA

 CA-571724337 PROJECT:  AF-028V
 ASBESTOS  TRAINING MISC SAMPLING EQUIPMENT
 ACCT:  0  &  M
 MCCLELLAN  AIR  FORCE  BASE
 MCCLELLAN  AFB                    CA

 CA-571724337 PROJECT:  AF-028DD
 AIR PERMITS
 ACCT: OTHERS
 MCCLELLAN  AIR  FORCE  BASE
 MCCLELLAN  AFB                    CA
CA-571724337 PROJECT: AF-015E
CARBON RENEWAL - WELL 18
ACCT: 0 * M
MCCLELLAN AIR FORCE BASE
MCCLELLAN AFB
CA-571724337 PROJECT: AF-015G
COLIFORM ANALYSIS CONTRACT
ACCT: 0 » M
MCCLELLAN AIR FORCE BASE
MCCLELLAN AFB
CA
CA
                                                        15.0  PSDF
                     367.0  ESRO
                       7.0  OTHR
                      20.0  OTHR
                                                       90.0  ESRO
                                                        8.0  OTHR
                                          90/09  LOW      AIR     ADEQUATE  ADEQUATE   ADEQUATE
                                                                   DESIGN    TIMING    ESTIMATE
                                          90/09 MEDIUM    AIR     ADEQUATE  ADEQUATE   ADEQUATE
                                                                   DESIGN    TIMING    ESTIMATE
                                          90/09 MEDIUM    AIR     ADEQUATE  ADEQUATE   ADEQUATE
                                                                   DESIGN    TIMING    ESTIMATE
                                          90/09  LOW      AIR     ADEQUATE  ADEQUATE   ADEQUATE
                                                                   DESIGN    TIMING    ESTIMATE
                                          90/09  LOW    DRINKING  ADEQUATE  ADEQUATE   ADEQUATE
                                                         WATER     DESIGN    TIMING    ESTIMATE
                                          90/09  HIGH   DRINKING  ADEQUATE  ADEQUATE   ADEQUATE
                                                         WATER     DESIGN    TIMING    ESTIMATE

-------
                                 FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                         DEPARTMENT OF AIR FORCE                 AIR FORCE LOGISTICS COMMAND
                PROJECT IDENTIFICATION
                     REQ    EST    PROJECT
  BUDGET     COMPL   COMPL  COMPL  ASSESS- MEDIA
(THOUSANDS)   STATUS  DATE    DATE   MENT    TYPE
                                                                                                                     USAF-17
                            ADEQUACY  OF  PROJECT
                          ENGIN-
                          EERING    TIME      COST
CA-571724337 PROJECT: AF-015H
IRON i SULPHUR BACTERIA CONTRACT
ACCT: 0 & M
MCCLELLAN AIR FORCE BASE
MCCLELLAN AFB                    CA

CA-571724337 PROJECT: AF-001FFF
ON BASE RA DESIGN/IMPLEMENTATION
ACCT: DERA
MCCLELLAN AIR FORCE BASE
MCCLELLAN AFB                    CA

CA-571724337 PROJECT: AF-001CCC
INTERM REMOVAL ACTIONS
ACCT: DERA
MCCLELLAN AIR FORCE BASE
MCCLELLAN AFB                    CA

CA-571724337 PROJECT: AF-001DDD
IRP TDY/ADMINISTRATIVE
ACCT: DERA
MCCLELLAN AIR FORCE BASE
MCCLELLAN AFB                    CA

CA-571724337 PROJECT: AF-001HHH
CONTAMINATED SOIL MANAGEMENT
ACCT: DERA
MCCLELLAN AIR FORCE BASE
MCCLELLAN AFB                    CA

CA-571724337 PROJECT: SF-001III
BASEWIDE CORE BORING
ACCT: DERA
MCCLELLAN AIR FORCE BASE
MCCLELLAN AFB                    CA
        1.6   OTHR
    1,000.0   CMPA
    1,000.0   CMPA
       30.0   CMPA
      500.0   CMPA
      100.0   CMPA
                           90/09   LOW    DRINKING  ADEQUATE  ADEQUATE   ADEQUATE
                                         WATER     DESIGN    TIMING    ESTIMATE
                           90/09  HIGH    CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
90/09  HIGH    CERCLA   ADEQUATE   ADEQUATE   ADEQUATE
                         DESIGN    TIMING    ESTIMATE
                           90/09  HIGH    CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
                           90/09  HIGH    CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
                          90/09  HIGH    CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE

-------
                                  FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                          DEPARTMENT OF AIR FORCE                 AIR FORCE LOGISTICS COMMAND
                 PROJECT IDENTIFICATION
                     REQ     EST    PROJECT
  BUDGET     COMPL   COMPL   COMPL  ASSESS- MEDIA
(THOUSANDS)   STATUS   DATE    DATE   MENT    TYPE
                                                                     USAF-18
                            ADEQUACY  OF  PROJECT
                          ENGIN-
                          EERING    TIME     COST
 CA-571724337 PROJECT:  AF-001RR
 ON/OFF  BASE  RI/FS
 ACCT: DERA
 MCCLELLAN AIR FORCE BASE
 MCCLELLAN AFB                   CA

 CA-57I724337 PROJECT:  AF001KKK
 AREA GRUNDWATER TREATMENT PLANT O&M
 ACCT: 0 & M
 MCCLELLAN AIR FORCE BASE
 MCCLELLAN AFB                   CA
     , 500.0   CMPA
    1,400.0   CMPA
90/12  HIGH    CERCLA   ADEQUATE   ADEQUATE    ADEQUATE
                         DESIGN    TIMING     ESTIMATE
                           90/09  HIGH    CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
CA-571724337 PROJECT: AF-001EEE
BASEWIDE CHEMICALS INVENTORY SYSTEM
ACCT: 0 & M
MCCLELLAN AIR FORCE BASE
MCCLELLAN AFB                    CA

CA-571724337 PROJECT: AF-001C
SM-ALC/EMI BASEWIDE SOIL SAMPLING ANALYSIS
ACCT: DERA
MCCLELLAN AIR FORCE BASE
MCCLELLAN AFB                    CA

CA-571724337 PROJECT: AF-001AAA
IRP EQUIPMENT & SUPPLIES
ACCT: DERA
MCCLELLAN AIR FORCE BASE
MCCLELLAN AFB                    CA

CA-571724337 PROJECT: AF-001BBB
IRP MANPOWER SUPPORT
ACCT: DERA
MCCLELLAN AIR FORCE BASE
MCCLELLAN AFB                    CA
                                                       30.0  ESDP
      650.0   OTHR
       30.0   OTHR
      150.0  OTHR
                           90/09  HIGH    CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
                           90/09 MEDIUM   CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
                           90/09 MEDIUM   CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
                          90/09  HIGH    CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE

-------
                                 FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR  1991

                         DEPARTMENT OF AIR FORCE                 AIR FORCE LOGISTICS COMMAND
                PROJECT IDENTIFICATION
                     REQ    EST    PROJECT
  BUDGET     COMPL   COMPL  COMPL  ASSESS- MEDIA
(THOUSANDS)   STATUS  DATE    DATE   MENT    TYPE
                                                                                                                     USAF-19
                            ADEQUACY  OF  PROJECT
                          ENGIN-
                          EERING    TIME      COST
CA-571724337 PROJECT: AF-001YY
IRP TECHNICAL SUPPORT
ACCT: DERA
MCCLELLAN AIR FORCE BASE
MCCLELLAN AFB                    CA
CA-571724337 PROJECT: AF-023X
SOLVENT RECYCLE CONTRACT
ACCT: 0 * M
MCCLELLAN AIR FORCE BASE
MCCLELLAN AFB
      180.0  OTHR
90/09 MEDIUM   CERCLA   ADEQUATE   ADEQUATE   ADEQUATE
                         DESIGN    TIMING    ESTIMATE
CA-571724337 PROJECT: AF-023N
SM-ALC/EME UST LEAK TESTING
ACCT: 0AM
MCCLELLAN AIR FORCE BASE
MCCLELLAN AFB
                                 CA
                                 CA
CA-571724337 PROJECT: AF-023GG
UST REMOVAL
ACCT: 0 * M
MCCLELLAN AIR FORCE BASE
MCCLELLAN AFB                    CA

CA-571724337 PROJECT: AF-023JJ
PERMITS FOR ENVIRONMENTAL SENSTIVE ACTIVITY
ACCT: 0 & M
MCCLELLAN AIR FORCE BASE
MCCLELLAN AFB                    CA

CA-571724337 PROJECT: AF-023KK
HAZARDOUS WASTE TRAINING
ACCT: 0 & M
MCCLELLAN AIR FORCE BASE
MCCLELLAN AFB                    CA
      174.0   ESDP   84/09   90/09   HIGH    SOLID    ADEQUATE  ADEQUATE   ADEQUATE
                                         WASTE     DESIGN    TIMING    ESTIMATE
       10.0  ESDP   88/01   90/09  HIGH
                                                      150.0  ESDP
      200.0  ESDP
        4.0  ESDP
                                                                           90/09  HIGH
                           90/09  HIGH
                           90/09  HIGH
               SOLID    ADEQUATE   ADEQUATE   ADEQUATE
               WASTE     DESIGN    TIMING    ESTIMATE
                                         SOLID    ADEQUATE  ADEQUATE   ADEQUATE
                                         WASTE     DESIGN    TIMING    ESTIMATE
                                         SOLID    ADEQUATE  ADEQUATE   ADEQUATE
                                         WASTE     DESIGN    TIMING    ESTIMATE
                                         SOLID    ADEQUATE  ADEQUATE   ADEQUATE
                                         WASTE     DESIGN    TIMING    ESTIMATE

-------
                                  FEDERAL  AGENCY  POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                          DEPARTMENT  OF AIR  FORCE                 AIR FORCE LOGISTICS COMMAND
                 PROJECT IDENTIFICATION
                                    REQ    EST   PROJECT
                 BUDGET     COMPL   COMPL  COMPL ASSESS- MEDIA
               (THOUSANDS)  STATUS  DATE   DATE  MENT    TYPE
                                                                                    USAF-20
    ADEQUACY OF PROJECT
  ENGIN-
  EERING    TIME      COST
 CA-571724337 PROJECT:  AF-023FFF
 WASTE  VOLUME REDUCTION EQUIPMENT
 ACCT:  DERA
 MCCLELLAN AIR FORCE  BASE
 MCCLELLAN AFB                   CA
 CA-571724337  PROJECT: AF-023P
 RE LINE TUNNELS BLDG  2436
 ACCT: 0  & M
 MCCLELLAN AIR FORCE  BASE
 MCCLELLAN AFB
                      85.0  ESDP   84/09  90/09  HIGH    SOLID
                                                         WASTE
CA-571724337 PROJECT: AF-023D
ASBESTOS REMOVAL AND DISPOSAL
ACCT: 0 & M
MCCLELLAN AIR FORCE BASE
MCCLELLAN AFB
CA
CA
CA-571724337 PROJECT: AF-023DD
M & R SPECTROPHOTOMETER
ACCT: 0 S M
MCCLELLAN AIR FORCE BASE
MCCLELLAN AFB                    CA

CA-571724337 PROJECT: AF-023UU
RCRA WASTE ANALYSIS
ACCT: 0 & M
MCCLELLAN AIR FORCE BASE
MCCLELLAN AFB                    CA

CA-571724337 PROJECT: AF-023MM
GASES FOR GC LAB
ACCT: 0 & M
MCCLELLAN AIR FORCE BASE
MCCLELLAN AFB                    CA
                                                      150.0  ESDF
                                                      370.9  ESRO
                                                       23.0  OTHR
                      10.0  OTHR
                       9.0  OTHR
                                          90/09 MEDIUM   SOLID
                                                         WASTE
                                          90/09  LOW     SOLID
                                                         WASTE
                                          90/09  HIGH    SOLID
                                                         WASTE
                                          90/09  HIGH    SOLID
                                                         WASTE
                                          90/09 MEDIUM   SOLID
                                                         WASTE
ADEQUATE  ADEQUATE   ADEQUATE
 DESIGN    TIMING    ESTIMATE
ADEQUATE  ADEQUATE   ADEQUATE
 DESIGN    TIMING    ESTIMATE
ADEQUATE  ADEQUATE   ADEQUATE
 DESIGN    TIMING    ESTIMATE
ADEQUATE  ADEQUATE     HIGH
 DESIGN    TIMING    ESTIMATE
ADEQUATE  ADEQUATE     HIGH
 DESIGN    TIMINS    ESTIMATE
ADEQUATE  ADEQUATE   ADEQUATE
 DESIGN    TIMING    ESTIMATE

-------
                                 FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                         DEPARTMENT OF AIR FORCE                 AIR FORCE LOGISTICS COMMAND
                PROJECT IDENTIFICATION
                                    REG)    EST   PROJECT
                 BUDGET     COMPL   COMPL  COMPL ASSESS- MEDIA
               (THOUSANDS)  STATUS  DATE   DATE  MENT    TYPE
                                                                                                                      USAF-21
                            ADEQUACY OF  PROJECT
                          ENGIN-
                          EERING     TIME      COST
CA-571724337 PROJECT: AF-023YY
SLUDGE DISPOSAL
ACCT: OTHERS
MCCLELLAN AIR FORCE BASE
MCCLELLAN AFB                    CA

CA-57172<»337 PROJECT: AF-023LLL
DRUM SHREDDER
ACCT: DERA
MCCLELLAN AIR FORCE BASE
MCCLELLAN AFB                    CA

CA-571724337 PROJECT: AF-004E
PCB EQUIPMENT REPLACEMENT PROTOTYPE
ACCT: OTHERS
MCCLELLAN AIR FORCE BASE
MCCLELLAN AFB                    CA

CA-571724337 PROJECT: AF-004G
ELECTRICAL EQUIPMENT REPLACEMENT
ACCT: 0 t M
MCCLELLAN AIR FORCE BASE
MCCLELLAN AFB                    CA
CA-571724337 PROJECT: AF-004H
INVENTORY EQUIPMENT
ACCT: 0 t M
MCCLELLAN AIR FORCE BASE
MCCLELLAN AFB
CA-571724337 PROJECT: AF-004D
PCB SAMPLING
ACCT: 0 t M
MCCLELLAN AIR FORCE BASE
MCCLELLAN AFB
CA
CA
                     500.0  OTHR
                     100.0  OTHR
90/09  HIGH    SOLID    ADEQUATE  ADEQUATE   ADEQUATE
               WASTE     DESIGN    TIMING    ESTIMATE
90/09  LOW     SOLID    ADEQUATE  ADEQUATE   ADEQUATE
               HASTE     DESIGN    TIMING    ESTIMATE
                     250.0  ESDP   8
-------
                                  FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                          DEPARTMENT OF AIR FORCE                 AIR FORCE LOGISTICS COMMAND
                 PROJECT  IDENTIFICATION
                     REQ    EST    PROJECT
  BUDGET     COMPL   COMPL   COMPL  ASSESS- MEDIA
(THOUSANDS)   STATUS  DATE    DATE   MENT    TYPE
                                                                     USAF-22
    ADEQUACY OF PROJECT
  ENGIN-
  EERING    TIME      COST
 CA-571724337 PROJECT:  AF-039XX
 TREATMENT  PLANT  SLUDGE ANALYSIS
 ACCT:  0  I,  M
 MCCLELLAN  AIR FORCE BASE
 MCCLELLAN  AFB                   CA

 CA-571724337 PROJECT:  AF-039YYY
 CONSTRUCT  WASHRACK BLG 738
 ACCT:  OTHERS
 MCCLELLAN  AIR FORCE BASE
 MCCLELLAN  AFB                   CA

 CA-571724337 PROJECT:  AF-039JJJJ
 CLEAN  HOLDING POND
 ACCT:  0  &  M
 MCCLELLAN  AIR  FORCE BASE
 MCCLELLAN  AFB                    CA

 CA-571724337  PROJECT:  AF-039ZZZ
 CHEMICAL WATER ANALYSIS
 ACCT:  0  &  M
 MCCLELLAN  AIR  FORCE BASE
 MCCLELLAN  AFB                    CA

 CA-571724337  PROJECT: AF-039XXXX
 INSTALL  LEAK CHECK TANK
 ACCT:  DERA
 MCCLELLAN  AIR  FORCE BASE
MCCLELLAN  AFB                    CA

 GA-571724330  PROJECT: AF-080E
 LANDFILL AND SLUDGE LAGOON CLEANUP- (RI/FS-RA)
ACCT: DERA
ROBINS AFB
ROBINS AF  BASE                   SA
                                                       20.0  CMPA
       77.0  ESRO
       10.0   ESDL
       15.9  OTHR
       50.0   OTHR
       67.0   ESDP
                                                                           90/09  HIGH    WATER
                           90/09  MEDIUM   WATER
                           90/09   LOW     WATER
                           90/09   LOW     WATER
                           90/09 MEDIUM   WATER
                           90/09 MEDIUM   SOLID
                                         WASTE
                                                  ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
                                                  ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
                                                  ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
                                                  ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
                                                  ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
ADEQUATE  ADEQUATE   ADEQUATE
 DESIGN    TIMING    ESTIMATE

-------
                                 FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                         DEPARTMENT OF AIR FORCE                 AIR FORCE LOGISTICS COMMAND
                PROJECT IDENTIFICATION
                                    REQ    EST   PROJECT
                 BUDGET     COMPL   COMPL  COMPL ASSESS- MEDIA
               (THOUSANDS)  STATUS  DATE   DATE  MENT    TYPE
                                                                                                                      USAF-23
                            ADEQUACY OF PROJECT
                          ENGIN-
                          EERING    TIME      COST
OH-571724312 PROJECT: AF-098Q
ASBESTOS ABATEMENT
ACCT: 0 * M
WRIGHT-PATTERSON AFB
WRIGHT-PATTERSON AFB
                                 OH
OH-571724312 PROJECT: AF-098M
ASBESTOS SAMPLING AND ANALYSIS
ACCT: 0 t M
WRIGHT-PATTERSON AFB
WRIGHT-PATTERSON AFB             OH

OH-571724312 PROJECT: AF-098N
TECHNICAL SUPPORT - AIR MONITORING
ACCT: 0 4 M
WRIGHT-PATTERSON AFB
WRIGHT-PATTERSON AFB             OH
OH-571724312 PROJECT: AF-044D
NEW AIR STRIPPERS FOR AREA A
ACCT: DERA
WRIGHT-PATTERSON AFB
WRIGHT-PATTERSON AFB
OH-571724312 PROJECT: AF-044B
VOC STRIPPER WELLS 8t9
ACCT: DERA
WRIGHT-PATTERSON AFB
WRIGHT-PATTERSON AFB

OH-571724312 PROJECT: AF-044A
VOC STRIPPERS AT WELLS
ACCT: DERA
WRIGHT-PATTERSON AFB
KRIGHT-PATTERSON AFB
                                 OH
OH
OH
                   5,000.0  ESDP
                      20.0  ESDL
                     250.0  OTHR
                       5.0  ESDP
90/09  HIGH     AIR     ADEQUATE  ADEQUATE   ADEQUATE
                         DESIGN    TIMING    ESTIMATE
                                          90/09 MEDIUM    AIR     ADEQUATE  ADEQUATE   ADEQUATE
                                                                   DESIGN    TIMING    ESTIMATE
                                          90/09 MEDIUM    AIR     ADEQUATE  ADEQUATE    ADEQUATE
                                                                   DESIGN    TIMING    ESTIMATE
90/09  HIGH   DRINKING  ADEQUATE  ADEQUATE    ADEQUATE
               WATER     DESIGN    TIMING    ESTIMATE
                      25.0  ESDF   89/01  90/09  HIGH   DRINKING  ADEQUATE   ADEQUATE    ADEQUATE
                                                         WATER     DESIGN    TIMING     ESTIMATE
                      50.0  OTHR   89/01  90/09  HIGH   DRINKING  ADEQUATE   ADEQUATE    ADEQUATE
                                                         WATER     DESIGN    TIMING     ESTIMATE

-------
                                  FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                          DEPARTMENT  OF AIR FORCE                 AIR FORCE LOGISTICS COMMAND
                 PROJECT  IDENTIFICATION
                                    REQ    EST   PROJECT
                 BUDGET     COMPL   COMPL  COMPL ASSESS- MEDIA
               (THOUSANDS)  STATUS  DATE   DATE  MENT    TYPE
                                                                                     USAF-24
                            ADEQUACY  OF  PROJECT
                          ENGIN-
                          EERING    TIME     COST
 OH-571724312  PROJECT:  AF-056A
 INSTALLATION  RESTORATION PROGRAM
 ACCT:  DERA
 WRIGHT-PATTERSON  AFB
 WRIGHT-PATTERSON  AFB             OH

 OH-571724312  PROJECT:  AF-056J
 REMEDIAL  DESIGN/REMEDIAL ACTION OVERSIGHT
 ACCT:  DERA
 WRIGHT-PATTERSON  AFB
 WRIGHT-PATTERSON  AFB             OH

 OH-571724312  PROJECT:  AF-056H
 SITE INSPECTION,  NEW IRP SITES
 ACCT:  DERA
 WRIGHT-PATTERSON  AFB
 WRIGHT-PATTERSON  AFB             OH

 OH-571724312  PROJECT:  AF-0996G
 PROVIDE LEAK  DETECTION FOR USTS AND PIPING
 ACCT: 0 4 M
 WRIGHT-PATTERSON  AFB
 WRIGHT-PATTERSON  AFB             OH

 OH-571724312  PROJECT: AF-99H
 REMOVE UNDERGROUND TANKS BASEWIDE
 ACCT: 0 4 M
 WRIGHT-PATTERSON AFB
 WRIGHT-PATTERSON AFB             OH
OH-571724312 PROJECT:
BOILER ASH DISPOSAL
ACCT: 0 4 M
WRIGHT-PATTERSON AFB
WRIGHT-PATTERSON AFB
                      AF-099II
                   2,500.0  ESDF
                     450.0  OTHR
                     195.0  OTHR
                                          90/09  HIGH    CERCLA   ADEQUATE  ADEQUATE    ADEQUATE
                                                                   DESIGN    TIMING    ESTIMATE
90/09  HIGH    CERCLA   ADEQUATE   ADEQUATE    ADEQUATE
                         DESIGN    TIMING     ESTIMATE
                                          90/09 MEDIUM   CERCLA   ADEQUATE  ADEQUATE    ADEQUATE
                                                                   DESIGN    TIMING    ESTIMATE
                     300.0  ESDF   89/12  90/09  HIGH    SOLID    ADEQUATE  ADEQUATE    ADEQUATE
                                                         WASTE     DESIGN    TIMING    ESTIMATE
                     200.0  ESDF   89/10  90/09 MEDIUM   SOLID
                                                         WASTE
                                                       10.0  ESDI
                                          90/09 MEDIUM   SOLID
                                                         WASTE
                        ADEQUATE   ADEQUATE    ADEQUATE
                         DESIGN    TIMING     ESTIMATE
                        ADEQUATE   ADEQUATE    ADEQUATE
                         DESIGN    TIMING     ESTIMATE
OH

-------
                                 FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                         DEPARTMENT OF AIR FORCE                 AIR FORCE LOGISTICS COMMAND
                PROJECT IDENTIFICATION
                                               REQ    EST   PROJECT
                            BUDGET     COMPL   COMPL  COMPL ASSESS- MEDIA
                          (THOUSANDS)  STATUS  DATE   DATE  MENT    TYPE
                                                                                                                      USAF-25
                                                ADEQUACY OF  PROJECT
                                              ENGIN-
                                              EERING    TIME      COST
OH-571724312 PROJECT: AF-099JJ
HAZARDOUS WASTE DISPOSAL
ACCT: 0 t M
WRIGHT-PATTERSON AFB
WRIGHT-PATTERSON AFB             OH
OH-571724312 PROJECT:
UST SPILL ASSESSMENT
ACCT: 0 t M
WRIGHT-PATTERSON AFB
WRIGHT-PATTERSON AFB
AF-099HH
           OH
OH-571724312 PROJECT: AF-099EE
HAZ MAT/HAZ WASTE SAMPLING/ANALYSIS
ACCT: 0 t M
WRIGHT-PATTERSON AFB
WRIGHT-PATTERSON AFB             OH

OH-571724312 PROJECT: AF-099CC
HAZARDOUS WASTE MINIMIZATION (PACER REDUCE)
ACCT: 0 t M
WRIGHT-PATTERSON AFB
WRIGHT-PATTERSON AFB             OH

OH-571724312 PROJECT: AF-099DD
HAZARDOUS WASTE REDUCTION STUDIES
ACCT: DERA
WRIGHT-PATTERSON AFB
WRIGHT-PATTERSON AFB             OH

OH-571724312 PROJECT: AF-099LL
OH CALL EMERGENCY RELEASE RESPONSE
ACCT: 0 t M
WRIGHT-PATTERSON AFB
WRIGHT-PATTERSON AFB             OH
                                200.0  OTHR
50.0  OTHR
                                                       80.0  OTHR
                                132.0  OTHR
                                 70.0  OTHR
                                110.0  OTHR
                                                     90/09 MEDIUM   SOLID
                                                                    HASTE
                                                     90/09  HIGH    SOLID
                                                                    WASTE
                                                     90/09 MEDIUM   SOLID
                                                                    WASTE
                    90/09  HIGH    SOLID
                                   HASTE
                    90/09  HIGH    SOLID
                                   WASTE
                    90/09 MEDIUM   SOLID
                                   WASTE
                                            ADEQUATE  ADEQUATE    ADEQUATE
                                             DESIGN    TIMING    ESTIMATE
                                            ADEQUATE  ADEQUATE
                                             DESIGN    TIMING
                                            ADEQUATE  ADEQUATE
                                             DESIGN    TIMING
                                                                             ADEQUATE   ADEQUATE
                                                                              DESIGN    TIMING
                                                                             ADEQUATE   ADEQUATE
                                                                              DESIGN     TIMING
                                                                             ADEQUATE  ADEQUATE
                                                                              DESIGN    TIMING
ADEQUATE
ESTIMATE
ADEQUATE
ESTIMATE
ADEQUATE
ESTIMATE
ADEQUATE
ESTIMATE
ADEQUATE
ESTIMATE

-------
                                 FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                         DEPARTMENT OF AIR FORCE                 AIR FORCE LOGISTICS COMMAND
                 PROJECT  IDENTIFICATION
                     REQ     EST    PROJECT
  BUDGET     COMPL   COMPL   COMPL  ASSESS- MEDIA
(THOUSANDS)   STATUS   DATE    DATE   MENT    TYPE
                                                                                                                     USAF-26
                            ADEQUACY OF  PROJECT
                          ENGIN-
                          EERING    TIME      COST
 OH-571724312  PROJECT: AF-099MM
 UNDERGROUND STORAGE  TANK REMOVAL/REMEDIATION
 ACCT:  DERA
 WRIGHT-PATTERSON AFB
 WRIGHT-PATTERSON AFB            OH

 OH-571724312  PROJECT: AF-090A
 REPLACE PCB TRANSFORMERS BASEWIDE
 ACCT:  0 8 M
 WRIGHT-PATTERSON AFB
 WRIGHT-PATTERSON AFB            OH

 OH-571724312  PROJECT: AF-142MM
 PETROLEUM DISTILLATE REMOVAL PROJECT
 ACCT: 0 & M
 WRIGHT-PATTERSON AFB
 WRIGHT-PATTERSON AFB             OH

 OH-57I724312  PROJECT: AF-142NN
 USES HYDROGEOLOGIC INVESTIGATION
 ACCT: DERA
 WRIGHT-PATTERSON AFB
 WRIGHT-PATTERSON AFB             OH

 OH-571724312  PROJECT: AF-142DD
 ENVIROMENTAL QUALITY ANALYSIS.
 ACCT: 0 & M
 WRIGHT-PATTERSON AFB
 WRIGHT-PATTERSON AFB             OH

OH-571724312  PROJECT: AF-142RR
BASE-WIDE SANITARY/STORM SEWER SURVEY
ACCT: 0 & M
WRIGHT-PATTERSON AFB
WRIGHT-PATTERSON AFB             OH
                                                      160.0  OTHR
                                                                           90/09  HIGH
                                         SOLID
                                         WASTE
                          NOT
                         AVAIL
 NOT
AVAIL
 NOT
AVAIL
      240.0   ESDL   90/10   90/09  HIGH    TOXIC    ADEQUATE  ADEQUATE   ADEQUATE
                                       SUBSTANCE   DESIGN    TIMING    ESTIMATE
       64.5   ESDL    87/05   90/09  HIGH    WATER    ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
      318.0   ESDL
      120.0   OTHR
      150.0   OTHR
90/09 MEDIUM   WATER    ADEQUATE  ADEQUATE    ADEQUATE
                         DESIGN    TIMING    ESTIMATE
                           90/09  HIGH    WATER
                           90/09 MEDIUM   WATER
                                                  ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
                                                  ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE

-------
                                 FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                         DEPARTMENT OF AIR FORCE                 AIR FORCE LOGISTICS COMMAND
                PROJECT IDENTIFICATION
                     REQ    EST    PROJECT
  BUDGET     COMPL   COMPL  COMPL ASSESS-  MEDIA
(THOUSANDS)   STATUS  DATE   DATE   MENT     TYPE
                                                                                                                     USAF-27
                            ADEQUACY OF PROJECT
                          ENGIN-
                          EERING    TIME      COST
OH-571724650 PROJECT: AF-128D
CONSTRUCT SEGREGATION CENTER FOR POL WASTE
ACCT: 0 t M
NEWARK AIR FORCE BASE
 NEWARK AFB                      OH

OH-571724650 PROJECT: AF-270L
STORM SEWER OUTFALL MONITORING
ACCT: 0 t M
NEWARK AIR FORCE BASE
 NEWARK AFB                      OH

OH-571724818 PROJECT: AF-194N
ASBESTOS AIR MONITORING
ACCT: 0 » M
NEWARK AIR FORCE BASE
NEWARK AFB                       OH

OH-571724818 PROJECT: AF-120B
IRP REMEDIAL INVESTIGATION/FEASIBILITY STUDYIRI
ACCT: DERA
NEWARK AIR FORCE BASE
NEWARK AFB                       OH

OH-571724818 PROJECT: AF-270G
PRETREATMENT MONITORING PROGRAM
ACCT: 0 t M
NEWARK AIR FORCE BASE
NEWARK AFB                       OH

OK-571724391 PROJECT: AF-055G
GEOHYDROLOGICAL INVESTIGATION
ACCT: DERA
TINKER AIR FORCE BASE
TINKER AFB                       OK
       10.0   ESDL
       12.0   OTHR
        5.0   ESDL
      100.0   OTHR
       12.0   PSDF
    1,500.0   ESDP
91/01  LOW     SOLID    ADEQUATE  ADEQUATE    ADEQUATE
               WASTE     DESIGN    TIMING    ESTIMATE
                           90/09   HIGH    WATER
90/09 MEDIUM    AIR
                                                  ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
                                                  ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
90/09 MEDIUM   CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
                         DESIGN    TIMING    ESTIMATE
                           90/09 MEDIUM   WATER    ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
                           90/09  HIGH    CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE

-------
                                  FEDERAL AGENCY  POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                          DEPARTMENT OF AIR FORCE                 AIR FORCE LOGISTICS COMMAND
                 PROJECT IDENTIFICATION
                     REQ    EST   PROJECT
  BUDGET     COMPL   COMPL  COMPL ASSESS-  MEDIA
(THOUSANDS)  STATUS  DATE   DATE   MENT     TYPE
                                                                     USAF-26
    ADEQUACY OF PROJECT
  ENGIN-
  EERING    TIME      COST
 OK-571724391  PROJECT:  AF-055C
 PHASE  IV INSTALLATION  RESTORATION PROGRAM
 ACCT:  DERA
 TINKER AIR  FORCE BASE
 TINKER AFB                       OK

 OK-571724391  PROJECT:  AF-082C
 INDUSTRIAL  SLUDGE/HAZARDOUS WASTE DISPOSAL
 ACCT:  0  4 M
 TINKER AIR  FORCE BASE
 TINKER AFB                       OK

 OK-571724391  PROJECT:  AF-082M
 RETROFIT UNDERGROUND STORAGE TANKS
 ACCT: 0  & M
 TINKER AIR  FORCE BASE
 TINKER AFB                       OK

 OK-571724391  PROJECT:  AF-082L
 LEAK TEST UNDERGROUND  STORAGE TANKS
 ACCT: 0  & M
 TINKER AIR  FORCE BASE
 TINKER AFB                       OK

 OK-571724391  PROJECT:  AF-049D
 REMOVE PCB TRANSFORMERS
 ACCT: 0 & M
 TINKER AIR FORCE BASE
 TINKER AFB                       OK

 OK-57172-+391  PROJECT:  AF-14WU
DISCHARGE SAMPLING
ACCT: 0 & M
TINKER AIR FORCE BASE
TINKER AFB                       OK
    5,500.0  ESDF   87/06   90/09   HIGH     CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
    3,000.0  ESDP   77/07  90/09   HIGH     SOLID
                                          WASTE
      900.0   ESDF    98/09   90/09 MEDIUM   SOLID
                                         WASTE
ADEQUATE  ADEQUATE   ADEQUATE
 DESIGN    TIMING    ESTIMATE
  NOT       NOT
 AVAIL     AVAIL
      200.0   ESDF    89/09   90/09 MEDIUM   SOLID      NOT       NOT
                                         WASTE     AVAIL     AVAIL
 NOT
AVAIL
                       NOT
                      AVAIL
      131.9   ESDP    90/09   90/09 MEDIUM   TOXIC    ADEQUATE  OVERDUE    ADEQUATE
                                       SUBSTANCE   DESIGN    TIMING    ESTIMATE
       75.0   CMPA   87/10   90/09  HIGH    WATER    ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE

-------
                                 FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                         DEPARTMENT OF AIR FORCE                 AIR FORCE LOGISTICS COMMAND
                PROJECT IDENTIFICATION
                     REQ    EST   PROJECT
  BUDGET     COMPL   COMPL  COMPL ASSESS-  MEDIA
(THOUSANDS)  STATUS  DATE   DATE  MENT    TYPE
                                                                                                                     USAF-29
                            ADEQUACY  OF  PROJECT
                          ENGIN-
                          EERING    TIME     COST
TX-571724333 PROJECT: AF-112H
AIR POLLUTION PERMIT PUBLIC NOTICES
ACCT: 0 t M
KELLY AFB
SAN ANTONIO                      TX

TX-571724333 PROJECT: AF-057EE
RI/FS LEON CREEK ZONE 1
ACCT: DERA
KELLY AFB
SAN ANTONIO                      TX

TX-571724333 PROJECT: AF-057GG
CONTRACT FOR SOIL BORINGS
ACCT: 0 * M
KELLY AFB
SAN ANTONIO                      TX

TX-571724333 PROJECT: AF-057HH
CONTRACT FOR SOIL/MATER SAMPLE ANALYSIS
ACCT: 0 * M
KELLY AFB
SAN ANTONIO                      TX

TX-571724333 PROJECT: AF-006K
REMOVAL OF USTS AND SPILL RESIDUE
ACCT: 0 4 M
KELLY AFB
SAN ANTONIO                      TX

TX-571724333 PROJECT: AF-006Q
ANALYSES/MAINTENANCE OF RCRA GROUNDWATER WELLS
ACCT: 0 t M
KELLY AFB
SAN ANTONIO                      TX
        3.0  OTHR
      975.0  ESDF
       50.0  ESDL
       75.0  ESDL
                           90/09  HIGH
                                           AIR
                        ADEQUATE   ADEQUATE   ADEQUATE
                         DESIGN     TIMING    ESTIMATE
90/09 MEDIUM   CERCLA   ADEQUATE   ADEQUATE   ADEQUATE
                         DESIGN    TIMING    ESTIMATE
90/09 MEDIUM   CERCLA   ADEQUATE   ADEQUATE   ADEQUATE
                         DESIGN     TIMING    ESTIMATE
90/09 MEDIUM   CERCLA   ADEQUATE   ADEQUATE   ADEQUATE
                         DESIGN    TIMING    ESTIMATE
      500.0  ESDP   88/12  90/09  HIGH     SOLID
                                          WASTE
      100.0  ESDL
                           90/09 MEDIUM    SOLID
                                          WASTE
                        ADEQUATE  ADEQUATE   ADEQUATE
                         DESIGN    TIMING    ESTIMATE
                        ADEQUATE  ADEQUATE   ADEQUATE
                         DESIGN    TIMING    ESTIMATE

-------
                                  FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                          DEPARTMENT OF AIR FORCE                 AIR FORCE LOGISTICS COMMAND
                 PROJECT  IDENTIFICATION
                                    REQ    EST   PROJECT
                 BUDGET     COMPL   COMPL  COMPL ASSESS- MEDIA
               CTHOUSANDS)  STATUS  DATE   DATE  MENT    TYPE
                                                                                                                      USAF-30
             ADEQUACY OF PROJECT
           ENGIN-
           EERING    TIME      COST
 TX-571724333 PROJECT:  AF-006M
 STATE  ANNUAL HAZARDOUS WASTE GENERATION FEE
 ACCT:  0  4  M
 KELLY  AFB
 SAN  ANTONIO                     TX
 TX-57172<*333  PROJECT: AF-0060
 STATE UST ANNUAL FEE
 ACCT: 0  i. »
 KELLY AFB
 SAN ANTONIO
                                                       10.0  OTHR
                                          90/09  HIGH    SOLID
                                                         WASTE
         ADEQUATE  ADEQUATE   ADEQUATE
          DESIGN    TIMING    ESTIMATE
TX-571724333 PROJECT: AF-164V
ENVIRONMENTAL FEES
ACCT: 0 & M
KELLY AFB
SAN ANTONIO
                                 TX
                                 TX
UT-571724350 PROJECT: AF-114I
ASBESTOS ABATEMENT IN BASE BLD6S
ACCT: 0 & M
HILL AIR FORCE BASE
OGDEN                            UT
UT-571724350 PROJECT: AF-114T
AIR POLLUTION MONITORING
ACCT: 0 4 M
HILL AIR FORCE BASE
OGDEN
UT-571724350 PROJECT: AF-1140
BLDG 507 VOC CONTROLS
ACCT: 0 & M
HILL AIR FORCE BASE
OGDEN
UT
UT
                       2.2  OTHR   88/10  90/09  HIGH
                      13.4  OTHR   91/01  90/09  LOW
                     200.0  ESDL
                      50.0  ESDL
                                                      150.0  ESDL
SOLID
WASTE
                                                         WATER
                                          90/09 MEDIUM    AIR
                                          90/09  HIGH     AIR
                                          90/09 MEDIUM    AIR
                                                                  ADEQUATE   ADEQUATE
                                                                   DESIGN    TIMING
                                                                  ADEQUATE   ADEQUATE
                                                                   DESIGN    TIMING
         ADEQUATE  ADEQUATE
          DESIGN    TIMING
                                                                    NOT
                                                                   AVAIL
                     NOT
                    AVAIL
                                                                  ADEQUATE   ADEQUATE
                                                                   DESIGN    TIMING
ADEQUATE
ESTIMATE
                              ADEQUATE
                              ESTIMATE
                                                                                       ADEQUATE
                                                                                       ESTIMATE
  NOT
 AVAIL
                              ADEQUATE
                              ESTIMATE

-------
                                 FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                         DEPARTMENT OF AIR FORCE                 AIR FORCE LOGISTICS COMMAND
                PROJECT IDENTIFICATION
                     REQ    EST   PROJECT
  BUDGET     COMPL   COMPL  COMPL ASSESS-  MEDIA
(THOUSANDS)  STATUS  DATE   DATE  MENT    TYPE
                                                                                                                     USAF-31
                            ADEQUACY OF  PROJECT
                          ENGIN-
                          EERING    TIME      COST
UT-571724350 PROJECT: AF-114N
PLANTING SHOP TOXIC AIR EMISSIONS CONTROL
ACCT: 0 » M
HILL AIR FORCE BASE
OGOEN                            UT

UT-571724350 PROJECT: AF-114G
AIR QUALITY PERMIT FEES
ACCT: 0 ft M
HILL AIR FORCE BASE
OGDEN                            UT

UT-571724350 PROJECT: AF-002I
CLEANUP ACTION AT CHEM PIT NO. 3 (OPER UNIT 2)
ACCT: DERA
HILL AIR FORCE BASE
OGDEN                            UT

UT-571724350 PROJECT: AF-002F
REMEDIAL ACTION PROJECTS
ACCT: DERA
HILL AIR FORCE BASE
OGDEN                            UT

UT-571724350 PROJECT: AF-002CC
CLEANUP AT BERMAN POND t IMTP (OPER UNIT 3)
ACCT: DERA
HILL AIR FORCE BASE
OGDEN                            UT

UT-571724350 PROJECT: AF-OS1N
LITHIUM BATTERY HW PART B PERMIT APPLICATION
ACCT: 0 * M
HILL AIR FORCE BASE
OGDEN                            UT
      200.0  OTHR
        5.0  OTHR
    6,000.0  ESDF
90/09  HIGH     AIR     ADEQUATE  ADEQUATE    ADEQUATE
                         DESIGN    TIMING    ESTIMATE
                           90/09  HIGH      AIR      ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
90/09  HIGH    CERCLA   ADEQUATE  ADEQUATE    ADEQUATE
                         DESIGN    TIMING    ESTIMATE
   11,000.0  ESDF   88/09  90/09  HIGH    CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
    5,000.0  OTHR
      100.0  PSDF
90/09 MEDIUM   CERCLA     NOT      NOT        NOT
                         AVAIL     AVAIL      AVAIL
                           90/09  HIGH     SOLID      NOT       NOT        NOT
                                          WASTE     AVAIL     AVAIL      AVAIL

-------
                                  FEDERAL  AGENCY  POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                          DEPARTMENT  OF  AIR  FORCE                 AIR FORCE LOGISTICS COMMAND
                 PROJECT IDENTIFICATION
                                    REQ    EST   PROJECT
                 BUDGET     COMPL   COMPL  COMPL ASSESS- MEDIA
               (THOUSANDS)  STATUS  DATE   DATE  MENT    TYPE
                                                                                    USAF-32
                            ADEQUACY OF  PROJECT
                          ENGIN-
                          EERING    TIME      COST
 UT-571724350 PROJECT:  AF-081Q
 UST LEAK DETECTION SYSTEM  0  4 M
 ACCT:  0 * M
 HILL AIR FORCE  BASE
 OGDEN                           UT
 UT-571724350  PROJECT: AF-081P
 UST  UPGRADE
 ACCT:  0  &  M
 HILL AIR FORCE BASE
 OGDEN
UT-571724350 PROJECT: AF-0310
HAZARDOUS WASTE PERMIT FEES
ACCT: 0 & M
HILL AIR FORCE BASE
OGDEN
                                 UT
UT
UT-571724350 PROJECT: AF-081I
HAZARDOUS WASTE TREATMENT/RECYCLE OR DISP
ACCT: 0 » M
HILL AIR FORCE BASE
OGDEN                            UT

UT-571724350 PROJECT: AF-091B
COMPLIANCE AUDITS
ACCT: 0 t M
HILL AIR FORCE BASE
OGDEN                            UT

UT-571724350 PROJECT: AF-170LLL
STORM WATER REUSE FACILITY
ACCT: 0 & M
HILL AIR FORCE BASE
OGDEN                            UT
                                                       80.0  PSDF
                     200.0  PSDF
                      10.0  ESRE
                     900.0  OTHR
                      75.0  ESDL
                     125.0  PSDF
                                          90/09  HIGH    SOLID      NOT        NOT
                                                         WASTE     AVAIL      AVAIL
                                          90/09  HIGH
                                          90/09  HIGH
                                                         SOLID
                                                         WASTE
                                                         SOLID
                                                         WASTE
                          NOT
                         AVAIL
                          NOT
                         AVAIL
 NOT
AVAIL
 NOT
AVAIL
                                               NOT
                                              AVAIL
 NOT
AVAIL
 NOT
AVAIL
                                          90/09  HIGH    SOLID     ADEQUATE   ADEQUATE   ADEQUATE
                                                         WASTE      DESIGN    TIMING    ESTIMATE
90/09  HIGH    TOXIC      NOT       NOT        NOT
             SUBSTANCE   AVAIL     AVAIL      AVAIL
                                          90/09  HIGH     WATER       NOT       NOT        NOT
                                                                   AVAIL     AVAIL      AVAIL

-------
                                 FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                         DEPARTMENT OF AIR FORCE                 AIR FORCE LOGISTICS COMMAND
                PROJECT IDENTIFICATION
                     RE
-------
                                  FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                          DEPARTMENT OF AIR FORCE                 AIR FORCE LOGISTICS COMMAND
                 PROJECT IDENTIFICATION
                     REQ     EST   PROJECT
  BUDGET     COMPL   COMPL   COMPL ASSESS- MEDIA
(THOUSANDS)   STATUS   DATE    DATE  MENT    TYPE
                                                                     USAF-34
   ADEQUACY OF PROJECT
 ENGIN-
 EERING    TIME      COST
 UT-571724908 PROJECT: AF-254D
 UTTR  ASBESTOS ABATEMENT
 ACCT:  0  &  M
 UTAH  TEST  AND TRAINING RANGE
 HILL  AFB
                                 UT
UT-571724908 PROJECT: AF-254A
AIR QUALITY PERMIT FEES - UTTR
ACCT: 0 4 M
UTAH TEST AND TRAINING RANGE
HILL AFB                         UT

UT-571724908 PROJECT: AF-199C
UST UPGRADE - UTTR
ACCT: 0 & M
UTAH TEST AND TRAINING RANGE
HILL AFB                         UT

UT-571724908 PROJECT: AF-199B
UTTR UST LEAK DETECTION SYSTEM 0 & M
ACCT: 0 4 M
UTAH TEST AND TRAINING RANGE
HILL AFB                         UT

UT-571724908 PROJECT: AF-199E
HAZARDOUS WASTE PERMIT FEES - UTTR
ACCT: 0 & M
UTAH TEST AND TRAINING RANGE
HILL AFB                         UT
                                                       50.0  ESDL
                                                        5.0  OTHR
      100.0   PSDF
       20.0   PSDF
       10.0   ESRE
                           90/09 MEDIUM    AIR
                           90/09 MEDIUM    AIR
                           90/09  HIGH    SOLID
                                         WASTE
                          90/09  HIGH    SOLID
                                         WASTE
                          90/09  HIGH
                                         SOLID
                                         WASTE
                                                  ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
                                                  ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
 NOT
AVAIL
 NOT
AVAIL
 NOT
AVAIL
 NOT
AVAIL
 NOT
AVAIL
 NOT
AVAIL
 NOT
AVAIL
 NOT
AVAIL
 NOT
AVAIL
      TOTAL, AIR FORCE LOGISTICS COMMAND
             62,533.4
                                          113

-------
                                  FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                         DEPARTMENT OF AIR FORCE                 MILITARY AIRLIFT COMMAND
                PROJECT IDENTIFICATION
                     REQ    EST   PROJECT
  BUDGET     COMPL   COMPL  COMPL ASSESS- MEDIA
(THOUSANDS)   STATUS  DATE   DATE   MENT    TYPE
                                                                                                                      USAF-35
                            ADEQUACY OF  PROJECT
                          ENGIN-
                          EERING    TIME      COST
AR-571824808 PROJECT: AF-068B
INSTALLATION RESTORATION PROGRAM-PHASE IV
ACCT: DERA
LITTLE ROCK AFB
LITTLE ROCK AIR BASE             AR

AR-571824808 PROJECT: AF-143D
UNDERGROUND STORAGE TANK (UST) RENOVATION
ACCT: 0 & M
LITTLE ROCK AFB
LITTLE ROCK AIR BASE             AR

CA-571824345 PROJECT: AF-070C
INSTALLATION RESTORATION PROGRAM PHASE IV
ACCT: DERA
NORTON AFB
NORTON AF BASE                   CA

CA-571824345 PROJECT: AF-070B
INSTALLATION RESTORATION PROGRAM PHASE II
ACCT: DERA
NORTON AFB
NORTON AF BASE                   CA

CA-571824345 PROJECT: AF-093D
REPLACE PCB TRANSFORMERS
ACCT: 0 * M
NORTON AFB
NORTON AF BASE                   CA

CA-571824345 PROJECT: AF-298M
MONITORING AND TESTING OF UNDERGROUND TANKS
ACCT: DERA
NORTON AFB
NORTON AF BASE                   CA
    1,000.0   PSDF
90/09 MEDIUM   CERCLA   ADEQUATE   ADEQUATE    ADEQUATE
                         DESIGN    TIMING    ESTIMATE
       24.0   OTHR    90/12   90/09 MEDIUM   SOLID      NOT       NOT        NOT
                                         WASTE     AVAIL     AVAIL      AVAIL
   20,000.0   ESDF
      500.0   ESDL
                           90/09  HIGH    CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
                           90/09  HIGH    CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
      280.9  INOV    90/10   90/09  HIGH    TOXIC    ADEQUATE  ADEQUATE   ADEQUATE
                                       SUBSTANCE   DESIGN    TIMING    ESTIMATE
      875.0   ESDP   89/01   90/09  HIGH    WATER    ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE

-------
                                  FEDERAL AGENCY  POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                          DEPARTMENT  OF  AIR  FORCE                 MILITARY AIRLIFT COMMAND
                 PROJECT IDENTIFICATION
                                    REQ    EST   PROJECT
                 BUDGET     COMPL   COMPL  COMPL ASSESS- MEDIA
               (THOUSANDS)  STATUS  DATE   DATE  MENT    TYPE
                                                                                    USAF-36
                            ADEQUACY  OF  PROJECT
                          ENGIN-
                          EERING   TIME      COST
 CA-571824575 PROJECT:  AF-071C
 INSTALLATION RESTORATION  PROGRAM, PHASE IV
 ACCT:  DERA
 TRAVIS AFB
 TRAVIS AFB                       CA

 DE-571824010 PROJECT:  AF-035E
 ASBESTOS  ABATEMENT REMOVAL CONTRACT
 ACCT:  0 4 M
 DOVER  AFB
 DOVER  AFB                       DE

 DE-571824010  PROJECT:  AF-064C
 INSTALLATION  RESTORATION  PROGRAM PHASE IV.
 ACCT:  DERA
 DOVER  AFB
 DOVER  AFB                        DE
DE-571824010 PROJECT: TS-072B
REPLACE PCB TRANSFORMERS
ACCT: 0 & M
DOVER AFB
DOVER AFB
FL-571824375 PROJECT: AF-052T
REHAB 0/F DITCH SYS
ACCT: 0 & M
HURLBURT FIELD
HURLBURT FIELD, FL
DE
FL
IL-571824177 PROJECT: AF-067B
INSTALLATION RESTORATION PROGRAM-PHASE IV
ACCT: DERA
SCOTT            AFB
SCOTT AF BASE                    IL
                   1,000.0  ESDF
                     300.0  PSDF
                   1,500.0  PSDF
                   1,000.0  PSDF
                                                      336.4  ESDL
                                                      350.0  PSDF
90/09  HIGH    CERCLA   ADEQUATE  ADEQUATE    ADEQUATE
                         DESIGN    TIMING    ESTIMATE
                                          90/09 MEDIUM    AIR
                                                                  ADEQUATE   ADEQUATE    ADEQUATE
                                                                   DESIGN    TIMING     ESTIMATE
90/09  HIGH    CERCLA    UNDER     OVERDUE       LOW
                         DESIGN    TIMING     ESTIMATE
90/09  HIGH    TOXIC    ADEQUATE  ADEQUATE    ADEQUATE
             SUBSTANCE   DESIGN    TIMING    ESTIMATE
                                          90/09  LOW     WATER    ADEQUATE   ADEQUATE    ADEQUATE
                                                                   DESIGN     TIMING     ESTIMATE
                                          90/09 MEDIUM   CERCLA   ADEQUATE   ADEQUATE    ADEQUATE
                                                                   DESIGN   TIMING     ESTIMATE

-------
                                 FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                         DEPARTMENT OF AIR FORCE                 MILITARY AIRLIFT COMMAND
                PROJECT IDENTIFICATION
                                    REQ    EST   PROJECT
                 BUDGET     COMPL   COMPL  COMPL ASSESS- MEDIA
               (THOUSANDS)  STATUS  DATE   DATE  MENT    TYPE
                                                                                    USAF-37
    ADEQUACY OF PROJECT
  ENGIN-
  EERING    TIME      COST
MD-B71824000 PROJECT: AF-06ZC
INSTALLATION RESTORATION PROGRAM -PHASE IV
ACCTi DERA
ANDREWS AIR FORCE BASE
CAMP SPRINGS                     MD

MD-571824000 PROJECT) AF-062D
IRP PHASE II
ACCTi DERA
ANDREWS AIR FORCE BASE
CAMP SPRINGS                     MD

MD-571S24000 PROJECTi SW-005R
LIFT STATION FIRE TRAINING PIT
ACCT: OHM
ANDREWS AIR FORCE BASE
CAMP SPRINGS                     MD
MD-571824000 PROJECT! SM-005S
REPLACE FIRE TRAINING PIT
ACCT: 0 t M
ANDREWS AIR FORCE BASE
CAMP SPRINGS
                   1,000.0  PSOF   09/12  90/09  HIGH    CERCLA   ADEQUATE   ADEQUATE   ADEQUATE
                                                                   DESIGN    TIMING    ESTIMATE
MD-571824000 PROJECT: SW-005Q
UPGRADE SPILL CONTAINMENT POL
ACCT: 0 » M
ANDREWS AIR FORCE BASE
CAMP SPRINGS

NC-571824475 PROJECT: AF-129U
 INSTALL MONITORING DEVICES
ACCT: 0 * M
POPE AFB
POPE AFB
MD
MD
NC
                     500.0  ESDL
                      80.0  ESDP
                     550.0  ESDP
                                                       36.0  PSDF
                     300.0  PSDF
                                          90/09 MEDIUM   CERCLA   ADEQUATE   ADEQUATE   ADEQUATE
                                                                   DESIGN    TIMING    ESTIMATE
                                          90/09 MEDIUM   SOLID
                                                         WASTE
                                          90/09  HIGH     SOLID
                                                         HASTE
                                          90/10 MEDIUM   WATER
                                          90/09  MEDIUM   WATER
ADEQUATE  ADEQUATE   ADEQUATE
 DESIGN    TIMING    ESTIMATE
ADEQUATE  ADEQUATE   ADEQUATE
 DESIGN    TIMING    ESTIMATE
ADEQUATE  ADEQUATE   ADEQUATE
 DESIGN    TIMING    ESTIMATE
                                                                 ADEQUATE  ADEQUATE   ADEQUATE
                                                                  DESIGN    TIMING    ESTIMATE

-------
                                  FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                          DEPARTMENT  OF AIR FORCE                 MILITARY AIRLIFT COMMAND
                 PROJECT IDENTIFICATION
                                    REQ    EST   PROJECT
                 BUDGET     COMPL   COMPL  COMPL ASSESS- MEDIA
               (THOUSANDS)  STATUS  DATE   DATE  MENT    TYPE
                                                                                                                     USAF-38
  ADEQUACY OF PROJECT
ENGIN-
EERING    TIME      COST
 NC-571824475 PROJECT:  AF-129P
 SERVICE  STATIONS LEAK  DETECTORS
 ACCT:  0  & M
 POPE  AFB
 POPE  AFB                        NC

 NJ-571824018 PROJECT:  AF-061B
 INSTALLATION RESTORATION PROGRAM PHASE II
 ACCT:  DERA
 MCGUIRE  AFB
 MCGUIRE  AFB                     NJ

 NJ-571824018 PROJECT:  AF-061C
 INSTALLATION RESTORATION PROGRAM-PHASE IV
 ACCT:  DERA
 MCGUIRE  AFB
 MCGUIRE  AFB                     NJ
NJ-571624018 PROJECT: AF-113W
WASTEWATER TREATMENT FACILITY
ACCT: MILCON
MCGUIRE AFB
MCGUIRE AFB
                                                      200.0  ESDL
                                          90/09  LOW     WATER     ADEQUATE  ADEQUATE   ADEQUATE
                                                                   DESIGN    TIMING    ESTIMATE
NM-571824423 PROJECT: AF-168F
REMOVE ASBESTOS GENERAL
ACCT: 0 & M
KIRTLAND AFB
ALBUQUERQUE
                                 NJ
NM
NM-571824423 PROJECT: AF-069C
INSTALLATION RESTORATION PROGRAM-PHASE IV
ACCT: DERA
KIRTLAND AFB
ALBUQUERQUE                      NM
                     500.0  PSDF   90/04  90/09 MEDIUM   CERCLA    ADEQUATE  ADEQUATE   ADEQUATE
                                                                   DESIGN    TIMING    ESTIMATE
                   3,500.0  PSDF   93/01  90/09  HIGH    CERCLA   ADEQUATE   ADEQUATE    ADEQUATE
                                                                   DESIGN     TIMING     ESTIMATE
                  12,000.0  CMPA   91/02  90/09  HIGH    WATER    ADEQUATE   ADEQUATE    ADEQUATE
                                                                   DESIGN    TIMING     ESTIMATE
                                                      100.0  ESDL
                                                    1,000.0  ESDF
                                          90/09 MEDIUM    AIR      ADEQUATE   ADEQUATE    ADEQUATE
                                                                   DESIGN     TIMING     ESTIMATE
                                          90/09 MEDIUM   CERCLA   ADEQUATE   ADEQUATE    ADEQUATE
                                                                   DESIGN     TIMING     ESTIMATE

-------
                                 FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                         DEPARTMENT OF AIR FORCE                 MILITARY AIRLIFT COMMAND
                PROJECT IDENTIFICATION
                     REQ    EST   PROJECT
  BUDGET     COMPL   COMPL  COMPL ASSESS- MEDIA
(THOUSANDS)  STATUS  DATE   DATE   MENT    TYPE
                                                                     USAF-39
                            ADEQUACY OF PROJECT
                          ENGIN-
                          EERING    TIME      COST
NM-571824423 PROJECT: AF-008M
SOLVENT ELIMINATION
ACCT: 0 t M
KIRTLAND AFB
ALBUQUERQUE                      NM

NM-57182-W23 PROJECT: AF-008D
HAZARD WASTE MANAGEMENT
ACCT: 0 » M
KIRTLAND AFB
ALBUQUERQUE                      NM

NM-571824423 PROJECT: AF-008G
TEST UNDERGROUND STORAGE TANKS
ACCT: DERA
KIRTLAND AFB
ALBUQUERQUE                      NM

NM-571824423 PROJECT: AF-2640
INSTALL TEST WELLS VARIOUS SITES
ACCT: 0 & M
KIRTLAND AFB
ALBUQUERQUE                      NM

OK-571824045 PROJECT: AF-073B
INSTALLATION RESTORATION PROGRAM-PHASE IV
ACCT: DERA
ALTUS            AFB
ALTUS AFB                        OK

SC-571824460 PROJECT: AF-066D
INSTALLATION RESTORATION PROGRAM-PHASE IV
ACCT: DERA
CHARLESTON AFB
NORTH CHARLESTON                 SC
       40.0  ESDP   84/05  90/09  HIGH
      200.0  ESDP   88/05  90/09  HIGH
               SOLID
               HASTE
                                          SOLID
                                          WASTE
 NOT
AVAIL
 NOT
AVAIL
 NOT
AVAIL
       50.0  ESDF   89/12   90/09 HIGH    SOLID
                                         WASTE
      200.0  ESDF   91/09   90/09 MEDIUM   WATER
                        ADEQUATE  ADEQUATE   ADEQUATE
                         DESIGN    TIMING    ESTIMATE
                        ADEQUATE  ADEQUATE    ADEQUATE
                         DESIGN    TIMING    ESTIMATE
                        ADEQUATE   ADEQUATE   ADEQUATE
                         DESIGN    TIMING    ESTIMATE
      500.0  ESDF
    1,500.0  PSDF
90/09 MEDIUM   CERCLA   ADEQUATE   ADEQUATE   ADEQUATE
                         DESIGN     TIMING    ESTIMATE
90/09  HIGH    CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
                         DESIGN    TIMING    ESTIMATE

-------
                            FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                    DEPARTMENT OF AIR FORCE                 MILITARY AIRLIFT COMMAND
           PROJECT  IDENTIFICATION
                                                                     REQ    EST   PROJECT
                                                  BUDGET     COMPL   COMPL  COMPL ASSESS- MEDIA
                                                (THOUSANDS)  STATUS  DATE   DATE  MENT    TYPE
                                                                                                                      USAF-40
  ADEQUACY OF PROJECT
ENGIN-
EERING    TIME      COST
WA-571824200  PROJECT: AF-072I                         500.0  ESDF
WELL  MONITORING AND TESTING
ACCT: DERA
MCCHORD AFB
MCCHORD AFB                      WA

WA-571824200  PROJECT: AF-072L                         250.0  PSDF
INVESTIGATION AND EXCAVATION OF AREA I, PH II/I
ACCT: DERA
MCCHORD AFB
MCCHORD AFB                      WA

WA-571824200 PROJECT: AF-151F                          30.0  OTHR
LABORATORY ANALYSIS FOR POLLUTANT SAMPLES
ACCT: 0 t M
MCCHORD AFB
MCCHORD AFB                      WA
                                                                     92/02 MEDIUM   CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
                                                                                              DESIGN    TIMING    ESTIMATE
                                                                     90/09 MEDIUM   CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
                                                                                              DESIGN    TIMING    ESTIMATE
                                                                     90/09  HIGH    SOLID    ADEQUATE  ADEQUATE   ADEQUATE
                                                                                    WASTE     DESIGN    TIMING    ESTIMATE
TOTAL, MILITARY AIRLIFT COMMAND
                                                              50,202.3
                                                                                      33

-------
                                 FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                         DEPARTMENT OF AIR FORCE                 STRATEGIC AIR COMMAND
                PROJECT IDENTIFICATION
                                    REQ    EST   PROJECT
                 BUDGET     COMPL   COMPL  COMPL ASSESS- MEDIA
               (THOUSANDS)  STATUS  DATE   DATE  MENT    TYPE
                                                                                    USAF-41
                            ADEQUACY OF  PROJECT
                          ENGIN-
                          EERING    TIME      COST
AR-571924473 PROJECT: AF-115C
INSTALLATION RESTORATION PROGRAM-PHASE IV
ACCT: DERA
EAKER AFB
BLYTHEVILLE                      AR

AR-571924473 PROJECT: AF-028N
REPAIR CLARIFIERS
ACCT: 0 » M
EAKER AFB
BLYTHEVILLE                      AR

CA-571924508 PROJECT: AF-025E
REMOVE ASBESTOS IN BUILDING 1086
ACCT: 0 & M
BEALE AFB
MARYSVILLE                       CA

CA-571924508 PROJECT: AF-104C
IRP FEASIBILITY STUDY AND REMEDIAL ACTION
ACCT: DERA
BEALE AFB
MARYSVILLE                       CA
CA-571924508 PROJECT: AF-206S
FPTA SOUTH UST REMOVAL
ACCT: 0 t M
BEALE AFB
MARYSVILLE
                     954.0  ESDF
CA-571924527 PROJECT: AF-147C
IRP SITE 2 REMEDIATION
ACCT: DERA
MARCH AIR FORCE BASE
RIVERSIDE
CA
CA
91/02  HIGH    CERCLA   ADEQUATE  ADEQUATE    ADEQUATE
                         DESIGN    TIMING    ESTIMATE
                      80.0  ESRO   91/11  90/09 MEDIUM   MATER     ADEQUATE  ADEQUATE   ADEQUATE
                                                                   DESIGN   TIMING    ESTIMATE
                     900.0  ESDL
                   3,000.0  ESDL
90/12  LOW
90/09  HIGH
                      50.0  ESDP   67/07  90/09  HIGH
 AIR     ADEQUATE  ADEQUATE   ADEQUATE
          DESIGN    TIMING    ESTIMATE
CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
          DESIGN    TIMING    ESTIMATE
               HATER    ADEQUATE  ADEQUATE   ADEQUATE
                         DESIGN    TIMING    ESTIMATE
                                                    1,000.0  OTHR
                                          90/09 MEDIUM   CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
                                                                  DESIGN    TIMING    ESTIMATE

-------
                                  FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                          DEPARTMENT OF AIR FORCE                 STRATEGIC AIR COMMAND
                 PROJECT  IDENTIFICATION
                                    REQ    EST   PROJECT
                 BUDGET     COMPL   COMPL  COMPL ASSESS- MEDIA
               (THOUSANDS)  STATUS  DATE   DATE  MENT    TYPE
                                                                                                                     USAF-42
                            ADEQUACY  OF  PROJECT
                          ENGIN-
                          EERING   TIME      COST
 CA-571924527 PROJECT: AF-1016
 IRP SITE  4  LANDFILL NO 6 CLOSURE/REMEDIATION
 ACCT:  DERA
 MARCH  AIR FORCE BASE
 RIVERSIDE                       CA

 CA-571924527 PROJECT: AF-101F
 IRP AREA  5  SROUNDWATER REMEDIATION
 ACCT: DERA
 MARCH AIR FORCE BASE
 RIVERSIDE                        CA
CA-571924551 PROJECT: AF-031H
TREAT TCE CONTAMINATED WATER
ACCT: DERA
CASTLE AFB
ATWATER
CA-571924551 PROJECT: AF-031I
CLEAN UP DISCHARGE AREA 8
ACCT: DERA
CASTLE AFB
ATWATER

CA-571924551 PROJECT: AF-031J
CLEAN UP FUEL SPILL 1
ACCT: DERA
CASTLE AFB
ATHATER

CA-571924551 PROJECT: AF-031K
CLEAN UP DISCHARGE AREA 4
ACCT: DERA
CASTLE AFB
ATWATER
                                 CA
CA
CA
CA
                   1,500.0  OTHR
                     250.0  OTHR
                   1,800.0  ESDP
                                                      700.0  ESDF
                     250.0  ESDF
                     700.0  ESDF
90/09 MEDIUM   CERCLA   ADEQUATE  ADEQUATE    ADEQUATE
                         DESIGN    TIMING    ESTIMATE
90/09 MEDIUM   CERCLA   ADEQUATE   ADEQUATE    ADEQUATE
                         DESIGN    TIMING    ESTIMATE
90/09  HIGH    CERCLA   ADEQUATE   ADEQUATE    ADEQUATE
                         DESIGN    TIMING    ESTIMATE
                                          90/09  HIGH    CERCLA    ADEQUATE   ADEQUATE   ADEQUATE
                                                                   DESIGN     TIMING    ESTIMATE
                                          90/09  HIGH    CERCLA   ADEQUATE   ADEQUATE   ADEQUATE
                                                                   DESIGN    TIMING    ESTIMATE
90/09  HIGH    CERCLA   ADEQUATE   ADEQUATE    ADEQUATE
                         DESIGN    TIMING    ESTIMATE

-------
                                 FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR  1991

                         DEPARTMENT OF AIR FORCE                 STRATEGIC AIR COMMAND
                PROJECT IDENTIFICATION
                     REQ    EST   PROJECT
  BUDGET     COMPL   COMPL  COMPL ASSESS- MEDIA
(THOUSANDS)  STATUS  DATE   DATE   MENT    TYPE
                                                                                                                     U3AF-43
                            ADEQUACY OF PROJECT
                          ENGIN-
                          EERING    TIME      COST
CA-571924551 PROJECT: AF-031L
CLEAN UP FUEL SPILL 4
ACCT: DERA
CASTLE AFB
ATWATER                          CA

CA-571924551 PROJECT: AF-031M
CLEAN UP FUEL SPILLS 2 AND 3
ACCT: DERA
CASTLE AFB
ATWATER                          CA

CA-571924551 PROJECT: AF-031N
CLEAN UP PITS 7,8, AND 9, LANDFILL 5
ACCT: DERA
CASTLE AFB
ATWATER                          CA

CA-571924551 PROJECT: AF-031P
CLEAN UP PITS 5 AND 6, LANDFILL 4
ACCT: DERA
CASTLE AFB
ATWATER                          CA

CA-571924551 PROJECT: AF-031Q
CLEAN UP CHEMICAL DISPOSAL PIT 4
ACCT: DERA
CASTLE AFB
ATWATER                          CA

CA-571924551 PROJECT: AF-031R
CLEAN UP DISCHARGE AREA 2, NEAR HARDSTAND 6
ACCT: DERA
CASTLE AFB
ATWATER                          CA
      250.0  ESDF
      250.0  ESDF
    1,500.0  ESDF
    1,500.0  ESDF
    1,400.0  ESDF
      700.0  ESDF
90/09  HIGH    CERCLA   ADEQUATE  ADEQUATE    ADEQUATE
                         DESIGN    TIMING    ESTIMATE
                           90/09  HIGH    CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
90/09  HIGH    CERCLA   ADEQUATE   ADEQUATE   ADEQUATE
                         DESIGN    TIMING    ESTIMATE
90/09  HIGH    CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
                         DESIGN    TIMING    ESTIMATE
90/09  HIGH    CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
                         DESIGN    TIMING    ESTIMATE
                           90/09  HIGH    CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE

-------
                                  FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                          DEPARTMENT OF AIR FORCE                 STRATEGIC AIR COMMAND
                 PROJECT  IDENTIFICATION
                     REQ    EST    PROJECT
  BUDGET     COMPL   COMPL   COMPL  ASSESS- MEDIA
(THOUSANDS)   STATUS  DATE    DATE   MENT    TYPE
                            ADEQUACY OF  PROJECT
                          ENGIN-
                          EERING    TIME     COST
 CA-571924551  PROJECT: AF-031S
 CLEAN UP  DISCHARGE AREA 3
 ACCT: DERA
 CASTLE AFB
 ATWATER                         CA

 CA-571924551  PROJECT: AF-031T
 CLEAN UP  FIRE TRAINING AREA 3
 ACCT:  DERA
 CASTLE  AFB
 ATWATER                          CA

 CA-571924551 PROJECT: AF-031U
 CLEANUP LANDFILL 2
 ACCT: DERA
 CASTLE AFB
 ATWATER                          CA

 CA-571924551 PROJECT: AF-031V
 CLEAN UP  FIRE TRAINING AREA 2
 ACCT: DERA
 CASTLE AFB
 ATWATER                          CA

 CA-571924551 PROJECT: AF-031X
 CLEAN UP DISCHARGE AREA 1.
 ACCT: DERA
 CASTLE AFB
ATWATER                          CA

CA-571924551 PROJECT: AF-029D
TEST ALL UNDERGROUND STORAGE TANKS
ACCT: 0 & M
CASTLE AFB
ATWATER                          CA
                                                      700.0  ESDF
      5SO.O   ESDF
    1,500.0   ESDF
      580.0   ESDF
      700.0   ESDF
                           90/09  HIGH    CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
                           90/09  HIGH    CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
90/09  HIGH    CERCLA   ADEQUATE   ADEQUATE    ADEQUATE
                         DESIGN    TIMING     ESTIMATE
                           90/09 MEDIUM   CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
                          90/09  HIGH
             ESDP   87/02   90/09  HIGH
                                         CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
               SOLID    ADEQUATE  ADEQUATE    ADEQUATE
               WASTE     DESIGN    TIMING    ESTIMATE

-------
                                 FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                         DEPARTMENT OF AIR FORCE                 STRATEGIC AIR COMMAND
                PROJECT IDENTIFICATION
                                    REQ    EST   PROJECT
                 BUDGET     COMPL   COMPL  COMPL ASSESS- MEDIA
               (THOUSANDS)  STATUS  DATE   DATE  MENT    TYPE
                                                                                                                      USAF-45
                            ADEQUACY OF PROJECT
                          ENGIN-
                          EERING    TIME      COST
CA-571924551 PROJECT: AF-050C
REPLACE PCB_CAPACITORS
ACCT: 0 I M
CASTLE AFB
ATWATER
CA-571924551 PROJECT: AF-254Q
REMEDIATE WASTE OIL TANK SOIL
ACCT: 0 ft M
CASTLE AFB
ATWATER

CA-571924551 PROJECT: AF-254R
REPAIR RECTANGULAR CLARIFIER
ACCT: 0 & M
CASTLE AFB
ATWATER
                                 CA
CA-571924551 PROJECT: AF-254V
STUDY OF SEWAGE TREATMENT PLANT
ACCT: 0 ft M
CASTLE AFB
ATWATER                          CA
CA-571924551 PROJECT: AF-254I
REMEDIATE SEWER LINE SOIL
ACCT: DERA
CASTLE AFB
ATWATER
CA
CA
CA
CA-571924551 PROJECT: AF-254U
INSTALL WASTE AND WATER METERS
ACCT: 0 i M
CASTLE AFB
ATWATER                          CA
                       9.7  ESRO
                     150.0  ESDF
                   2,000.0  ESDF
                     200.0  ESDF
                      10.0  ESRO
                                                       32.5  ESRO
                                          90/09 MEDIUM   TOXIC    ADEQUATE  ADEQUATE   ADEQUATE
                                                       SUBSTANCE   DESIGN    TIMING    ESTIMATE
                                          90/12  HIGH    WATER    ADEQUATE  ADEQUATE    ADEQUATE
                                                                   DESIGN    TIMING    ESTIMATE
90/09  H-IGH    WATER    ADEQUATE  ADEQUATE    ADEQUATE
                         DESIGN    TIMING    ESTIMATE
                                          90/09 MEDIUM   WATER
                                          91/03 MEDIUM   WATER
                                                                  ADEQUATE   ADEQUATE   ADEQUATE
                                                                   DESIGN    TIMING    ESTIMATE
                                                                  ADEQUATE  ADEQUATE   ADEQUATE
                                                                   DESIGN    TIMING    ESTIMATE
                                          90/09 MEDIUM   WATER     ADEQUATE  ADEQUATE   ADEQUATE
                                                                   DESIGN    TIMING    ESTIMATE

-------
                                  FEDERAL AGENCY  POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                          DEPARTMENT OF  AIR  FORCE                STRATEGIC AIR COMMAND
                 PROJECT IDENTIFICATION
                     REQ     EST   PROJECT
  BUDGET     COMPL   COMPL   COMPL ASSESS- MEDIA
(THOUSANDS)   STATUS   DATE    DATE  MENT    TYPE
                                                                     U5AF-46
                            ADEQUACY OF  PROJECT
                          ENGIN-
                          EERING    TIME      COST
 CA-571924551 PROJECT:  AF-254S
 REPLACE SEWAGE LIFT STATION
 ACCT:  0 & M
 CASTLE AFB
 ATWATER                         CA

 CA-571924551 PROJECT:  AF-254K
 REPLACE SLUDGE PUMPS
 ACCT:  0 & M
 CASTLE AFB
 ATWATER                         CA

 CA-571924551  PROJECT:  AF-254W
 CONSTRUCT INDUSTRIAL WASTE HOLDING TANK
 ACCT:  0 » M
 CASTLE  AFB
 ATWATER                          CA

 CA-571925149  PROJECT:  AF-134C
 INSTALLATION  RESTORATION PROGRAM- RD/RA
 ACCT: DERA
 VANDENBERG  AFB
 VANDENBERG  AFB                   CA

 CA-571925149  PROJECT:  AF-134B
 INSTALLATION  RESTORATION PROGRAM - RI/FS
 ACCT: DERA
 VANDENBERG  AFB
 VANDENBERG  AFB                   CA

CA-571925149  PROJECT: AF-033G
REMOVE FUEL TANKS NVAFB
ACCT: 0 * M
VANDENBERG  AFB
VANDENBERG  AFB                   CA
                                                       75.1  ESRO
       78.0   ESRO
      118.2   ESRO
    2,000.0  ESDF
    1,000.0   ESDF
      86.0  ESDF
                          90/09 MEDIUM   WATER    ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
                          90/09 MEDIUM   WATER    ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
                          90/09  LOW     WATER    ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
90/09  HIGH    CERCLA   ADEQUATE   ADEQUATE    ADEQUATE
                         DESIGN    TIMING    ESTIMATE
90/09  HIGH    CERCLA   ADEQUATE  ADEQUATE    ADEQUATE
                         DESIGN    TIMING    ESTIMATE
                          90/09 MEDIUM   SOLID    ADEQUATE  ADEQUATE   ADEQUATE
                                         WASTE     DESIGN    TIMING    ESTIMATE

-------
                                 FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                         DEPARTMENT OF AIR FORCE                 STRATEGIC AIR COMMAND
                PROJECT IDENTIFICATION
                                    REQ    EST    PROJECT
                 BUDGET     COMPL   COMPL  COMPL  ASSESS- MEDIA
               (THOUSANDS)   STATUS  DATE   DATE   MENT    TYPE
                                                                                                                     USAF-47
  ADEQUACY OF PROJECT
ENGIN-
EERING    TIME      COST
CA-571925149 PROJECT: AF-033H
REMOVE FUEL TANKS SVAFB
ACCT: 0 t M
VANDENBERG AFB
VANDENBERG AFB
                                 CA
CA-571925149 PROJECT: AF-046Q
REPLACE SEW TREATMENT FAC 23260
ACCT: 0 4 M
VANDENBERG AFB
VANDENBERG AFB                   CA

GU-571999519 PROJECT: AF-106C
INSTALLATION RESTORATION PROGRAM RD/RA
ACCT: DERA
ANDERSEN AFB
MARIANAS ISLANDS                 GU
IN-571924472 PROJECT: AF-043B
ASBESTOS REMOVAL BASE WIDE
ACCT: 0 * M
GRISSOM AFB
GRISSOM AFB
IN-571924472 PROJECT: AF-067S
TERT SEW TREATMENT
ACCT: MILCON
GRISSOM AFB
GRISSOM AFB

IN-571924472 PROJECT: AF-067V
INSTALL 0/W SEPARATOR RAMP
ACCT: 0 4 M
GRISSOM AFB
GRISSOM AFB
                                 IN
IN
IN
                     200.0   OTHR
                     150.0   CMPA
                   1,000.0   ESDF
                     200.0   ESOL
                   4,500.0   CMPA
                     190.0  ESRO
                                          90/09   HIGH    SOLID    ADEQUATE  ADEQUATE   ADEQUATE
                                                        WASTE     DESIGN    TIMING    ESTIMATE
                                          90/09  HIGH    WATER    ADEQUATE  ADEQUATE   ADEQUATE
                                                                  DESIGN    TIMING    ESTIMATE
                                          90/09  HIGH    CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
                                                                  DESIGN    TIMING    ESTIMATE
                                          90/09 MEDIUM   TOXIC    ADEQUATE  ADEQUATE   ADEQUATE
                                                      SUBSTANCE   DESIGN    TIMING    ESTIMATE
                                          90/09   LOW     WATER
                                         90/09 MEDIUM   WATER
                                                                 ADEQUATE  ADEQUATE   ADEQUATE
                                                                  DESIGN    TIMING    ESTIMATE
                                                                 ADEQUATE  ADEQUATE   ADEQUATE
                                                                  DESIGN    TIMING    ESTIMATE

-------
                                  FEDERAL AGENCY POLLUTION  ABATEMENT PLAN FOR FISCAL YEAR 1991

                          DEPARTMENT OF AIR FORCE                STRATEGIC AIR COMMAND
                 PROJECT IDENTIFICATION
                                    REQ    EST   PROJECT
                 BUDGET     COMPL   COMPL  COMPL ASSESS- MEDIA
               (THOUSANDS)  STATUS  DATE   DATE  MENT    TYPE
                                                                                    USAF-48
    ADEQUACY OF PROJECT
  ENGIN-
  EERING    TIME      COST
 IN-571924472 PROJECT:  AF-067Y
 REPAIR OIL/WATER SEPERATORS
 ACCT:  0 S M
 GRISSOM AFB
 GRISSOM AFB
IN
 KS-571924140  PROJECT:  AF-177C
 ASBESTOS REMOVAL  &  REINSULATION-BASEWIDE
 ACCT:  0 & M
 MCCONNELL AIR FORCE BASE
 WICHITA                         KS

 KS-571924140  PROJECT:  AF-042F
 UNDERGROUND STORAGE TANK REMOVAL/REPLACEMENT
 ACCT:  0 ft M
 MCCONNELL AIR FORCE BASE
 WICHITA                         KS

 KS-571924140  PROJECT:  AF-242N
 HOLDING POND  FIRE TRAINING FACILITY
 ACCT:  0 & M
 MCCONNELL AIR FORCE BASE
 WICHITA                         KS

 LA-571924050  PROJECT:  AF-045A
 INSTALL CHLORINATOR 1358 WATER TOWER
 ACCT:  0 4  M
 BARKSDALE        AFB
 BARKSDALE  AF  BASE                LA

 LA-571924050  PROJECT:  AF-026G
 INSTALL CATHODIC PROTECTION 60 U6 TANKS
ACCT: 0 t  M
BARKSDALE        AFB
BARKSDALE  AF  BASE                LA
                                                        75.0  ESRO
                                                      200.0  OTHR
                                          90/09 MEDIUM   WATER    ADEQUATE  ADEQUATE   ADEQUATE
                                                                  DESIGN    TIMING    ESTIMATE
                                          90/09 MEDIUM    AIR     ADEQUATE  ADEQUATE   ADEQUATE
                                                                  DESIGN    TIMING    ESTIMATE
                     386.0  PSDF   98/12   90/09  HIGH
                     100.0   ESDF
                      66.6   ESRO
                                          90/09   HISH
                                                         SOLID
                                                         WASTE
                                                        MATER
ADEQUATE  ADEQUATE   ADEQUATE
 DESIGN    TIMING    ESTIMATE
                                                                   NOT
                                                                  AVAIL
            NOT
           AVAIL
 NOT
AVAIL
                                          90/09   LOW    DRINKING  ADEQUATE  ADEQUATE   ADEQUATE
                                                        WATER     DESIGN    TIMING    ESTIMATE
                      90.0   ESDF    98/12   90/09  HIGH    SOLID    ADEQUATE  ADEQUATE   ADEQUATE
                                                        WASTE     DESIGN    TIMING    ESTIMATE

-------
                                 FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                         DEPARTMENT OF AIR FORCE                 STRATEGIC AIR COMMAND
                PROJECT IDENTIFICATION
                     REQ    EST   PROJECT
  BUDGET     COMPL   COMPL  COMPL ASSESS- MEDIA
(THOUSANDS)  STATUS  DATE   DATE  MENT    TYPE
                                                                                                                      USAF-49
                            ADEQUACY OF PROJECT
                          ENGIN-
                          EERING    TIME      COST
LA-571924050 PROJECT: AF-072S
REPAIR  FIRE TRAINING AREA
ACCT: 0 4 M
BARKSDALE        AFB
BARKSDALE AF BASE                LA

LA-571924050 PROJECT: AF-072Q
INSTALL STRAINER PIT POL AREA
ACCT: 0 » M
BARKSDALE        AFB
BARKSDALE AF BASE                LA

LA-571924050 PROJECT: AF-0720
REPAIR STORM DRAINS
ACCT: 0 4 M
BARKSDALE        AFB
BARKSDALE AF BASE                LA

LA-571924050 PROJECT: AF-072P
REPR AIRFIELD STORM DRAINAGE
ACCT: 0 4 M
BARKSDALE        AFB
BARKSDALE AF BASE                LA

ME-571924522 PROJECT: AF-033B
INSTALLATION RESTORATION PROGRAM - RD/RA
ACCT: DERA
LORING AFB
LIMESTONE (TOWN OF)              ME

ME-571924522 PROJECT: AF-077L
REPAIR SEWER SYSTEM-MFH
ACCT: 0 t M
LORING AFB
LIMESTONE (TOWN OF)              ME
      600.0  ESDF
       13. it  ESDF
                           90/09 MEDIUM   WATER
                           90/09 MEDIUM   WATER
                                                   ADEQUATE  ADEQUATE   ADEQUATE
                                                    DESIGN    TIMING    ESTIMATE
                                                   ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
      541.5  ESRO   93/06  90/09 MEDIUM   WATER     ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
      635.6  ESRO
    1,250.0  ESDF
                           90/09  LOW      WATER    ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
90/09  HIGH    CERCLA   ADEQUATE   ADEQUATE   ADEQUATE
                         DESIGN    TIMING    ESTIMATE
      103.6  ESDF   77/07  90/09  MEDIUM   WATER    ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE

-------
                                  FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                          DEPARTMENT  OF  AIR  FORCE                 STRATEGIC AIR COMMAND
                 PROJECT IDENTIFICATION
                     REQ     EST   PROJECT
  BUDGET     COMPL   COMPL   COMPL ASSESS- MEDIA
(THOUSANDS)   STATUS   DATE    DATE  MENT    TYPE
                                                                                                                     USAF-50
                            ADEQUACY OF  PROJECT
                          ENGIN-
                          EERING    TIME      COST
 MI-571924760 PROJECT:  AF-112C
 INSTALLATION RESTORATION  PROGRAM- ROD/RA
 ACCT:  DERA
 K I  SAWYER       AFB
 SWINN                            MI

 MO-571924549 PROJECT:  AF-103B
 INSTALLATION RESTORATION  PROGRAM - RI/FS
 ACCT:  DERA
 WHITEMAN AFB
 KNOBNOSTER                      MO

 MT-571924556  PROJECT:  AF-111C
 INSTALLATION  RESTORATION  PROGRAM - RD/RA
 ACCT:  DERA
 MALMSTROM  AFB
 MALSTROM AFB                     MT

 MT-571924556  PROJECT:  AF-041F
 REPLACE UNDERGROUND FUEL TANKS 132 LFS
 ACCT:  0 &  M
 MALMSTROM  AFB
 MALSTROM AFB                     MT

 MT-571924556  PROJECT:  AF-041H
 UNDERGROUND TANK REMOVAL, TESTING UPGRADE
 ACCT:  0 4  M
 MALMSTROM  AFB
 MALSTROM AFB                     MT

ND-571924758  PROJECT:  AF-043C
DESIGN OF  SANITARY LANDFILL CLOSURE
ACCT: DERA
MINOT AFB
MINOT AFB                        ND
                                                      550.0  ESDF
      500.0   ESDF
      580.0   ESDF
      800.0   ESDF
                           90/09  HIGH    CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
                          90/09 MEDIUM   CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
                          90/09  HIGH    CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
                          90/09  HIGH    SOLID      NOT       NOT
                                         WASTE     AVAIL     AVAIL
    1,205.8   ESDF   92/01  91/01 MEDIUM   SOLID
                                         WASTE
    3,304.5  OTHR
90/09 MEDIUM   SOLID
               WASTE
                          NOT
                         AVAIL
                                                    NOT
                                                   AVAIL
 NOT
AVAIL
 NOT
AVAIL
                                               NOT
                                              AVAIL
 NOT
AVAIL
 NOT
AVAIL

-------
                                 FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                         DEPARTMENT OF AIR FORCE                 STRATEGIC AIR COMMAND
                PROJECT IDENTIFICATION
                     REQ    EST   PROJECT
  BUDGET     COMPL   COMPL  COMPL ASSESS- MEDIA
(THOUSANDS)   STATUS  DATE   DATE   MENT    TYPE
                                                                                                                     USAF-51
                            ADEQUACY OF PROJECT
                          ENGIN-
                          EERING    TIME      COST
ND-571924758 PROJECT: AF-043D
CLEAN UP AND RESTORE EOD AREA
ACCT: FUNDING ACCOUNT UNKNOWN
MINOT AFB
MINOT AFB
                                 ND
ND-571924758 PROJECT: AF-133V
REPAIR OR REPLACE UNDERGROUND STORAGE TANKS
ACCT: 0 * M
MINOT AFB
MINOT AFB                        ND

ND-571924758 PROJECT: AF-133S
CLEAN OIL/WATER SEPARATORS
ACCT: 0 » M
MINOT AFB
MINOT AFB                        ND

ND-57192*759 PROJECT: AF-116D
INSTALLATION RESTORATION PROGRAM-RD/RA
ACCT: DERA
GRAND FORKS AIR FORCE BASE
EMERADO                          ND

ND-57192<+759 PROJECT: AF-036J
ABANDONED TANK REMOVAL
ACCT: DERA
GRAND FORKS AIR FORCE BASE
EMERADO                          ND

ND-571924759 PROJECT: AF-132K
INSTALL FILL PIPES, BASE FUEL STORAGE TANK
ACCT: 0 & M
GRAND FORKS AIR FORCE BASE
EMERADO                          ND
      500.0  OTHR
      250.0   PSDF
       10.0   OTHR
      500.0   ESDF
       42.1   ESDF
       25.0  ESDP
                           90/09  MEDIUM   SOLID      NOT       NOT        NOT
                                         WASTE     AVAIL     AVAIL      AVAIL
                           90/09  MEDIUM   WATER      NOT       NOT        NOT
                                                   AVAIL     AVAIL      AVAIL
                           90/09  MEDIUM   WATER      NOT       NOT        NOT
                                                   AVAIL     AVAIL      AVAIL
90/09  HIGH    CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
                         DESIGN    TIMING    ESTIMATE
                           90/09 MEDIUM   SOLID
                                         WASTE
                           90/09  HIGH    WATER
                          NOT
                         AVAIL
                                                    NOT
                                                   AVAIL
 NOT
AVAIL
                                   NOT
                                  AVAIL
 NOT
AVAIL
            NOT
           AVAIL

-------
                                  FEDERAL AGENCY  POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                          DEPARTMENT OF AIR FORCE                 STRATEGIC AIR COMMAND
                 PROJECT IDENTIFICATION
                     REQ     EST    PROJECT
  BUDGET     COMPL   COMPL   COMPL  ASSESS- MEDIA
(THOUSANDS)   STATUS  DATE    DATE   MENT    TYPE
                                                                                                                     USAF-52
             ADEQUACY OF PROJECT
           ENGIN-
           EERING    TIME      COST
 NE-571924648 PROJECT: AF-108B
 INSTALLATION RESTORATION  PROGRAM -REM INV/FEAS
 ACCT:  DERA
 OFFUTT AIR   FORCE BASE
 OFFUTT A.F.B.                    NE

 NE-571924648 PROJECT: AF-10SC
 INSTALLATION RESTORATION  REM DESIGN/REM ACTION
 ACCT:  DERA
 OFFUTT AIR   FORCE BASE
 OFFUTT A.F.B.                    NE

 NE-571924648 PROJECT: AF-044D
 REMEDIATE ABANDONED UNDERGROUND STORAGE TANK
 ACCT:  DERA
 OFFUTT  AIR   FORCE BASE
 OFFUTT  A.F.B.                    NE

 NH-571924847  PROJECT: AF-045F
 REPLACE UNDERGROUND FUEL  STORA6 TANKS
 ACCT: 0 * M
 PEASE AIR FORCE BASE, NH
 PORTSMOUTH                       NH

 NY-571924451 PROJECT: AF-096E
 REMOVE CONTAMINATION AT DEMO AREA/T-9
 ACCT: DERA
 GRIFFISS         AFB
GRIFFISS AFB                     NY

NY-571924774 PROJECT: AF-060D
 INSTALLATION RESTORATION PROGRAM - RD/RA
ACCT: DERA
 PLATTSBURGH      AFB
 PLATTSBURGH AFB                  NY
                                                    1,000.0  ESDF
      500.0   ESDF
      300.0   ESDP
      250.0   ESDF
                           90/09  HIGH    CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
                           90/09  HIGH
                           90/09  HIGH
      500.0   ESDF   90/10  90/09  HIGH
    2,100.0  PSDF   93/01  90/09  HIGH
                                         CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
                                         SOLID
                                         WASTE
           NOT
          AVAIL
 NOT
AVAIL
                          90/09  HIGH    SOLID      NOT       NOT
                                         WASTE     AVAIL     AVAIL
 NOT
AVAIL
                                NOT
                               AVAIL
CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
          DESIGN    TIMING    ESTIMATE
CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
          DESIGN    TIMING    ESTIMATE

-------
                                 FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                         DEPARTMENT OF AIR FORCE                 STRATEGIC AIR COMMAND
                PROJECT IDENTIFICATION
                     REQ    EST   PROJECT
  BUDGET     COMPL   COMPL  COMPL ASSESS- MEDIA
(THOUSANDS)  STATUS  DATE   DATE  MENT    TYPE
                                                                                                                      USAF-53
                            ADEQUACY OF PROJECT
                          ENGIN-
                          EERING    TIME      COST
SD-571924644 PROJECT: AF-179G
ABATING ASBESTOS IN FACILITY 1101
ACCT: 0 i M
ELLSWORTH AFB
RAPID CITY                       SD

SD-571924644 PROJECT: AF-179F
ABATING ASBESTOS PHASE 1
ACCT: 0 * M
ELLSWORTH AFB
RAPID CITY                       SD

SD-571924644 PROJECT: AF-105C
INSTALLATION RESTORATION PROGRAM-PHASE IV
ACCT: DERA
ELLSWORTH AFB
RAPID CITY                       SD

TX-571924643 PROJECT: AF-102C
INSTALLATION RESTORATION PROGRAM  RD/RA.
ACCT: DERA
DYESS AFB
DYESS AFB                        TX

WA-571924647 PROJECT: AF-109B
INSTALLATION RESTORATION PROGRAM - RI/FS
ACCT: DERA
FAIRCHILD AFB
FAIRCHILD AF BASE                WA

WA-571924647 PROJECT: AF-109C
INSTALLATION RESTORATION PROGRAM- RD/RA
ACCT: DERA
FAIRCHILD AFB
FAIRCHILD AF BASE                WA
       45.7  ESDF   91/06  90/09 MEDIUM
        6.0  ESDF   93/09  90/09 MEDIUM
    2,100.0  ESDF
      700.0  ESDF
      300.0  ESDF
    1,100.0  ESDF
                           90/09  HIGH
                           90/09  HIGH
90/09  HIGH
90/09  HIGH
                                           AIR      ADEQUATE  ADEQUATE   ADEQUATE
                                                    DESIGN    TIMING    ESTIMATE
                                           AIR     ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
                                          CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
                                          CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
                                         CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
                                         CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE

-------
                                  FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                          DEPARTMENT OF AIR FORCE                 STRATEGIC AIR COMMAND
                 PROJECT  IDENTIFICATION
                     REQ     EST    PROJECT
  BUDGET     COMPL   COMPL   COMPL  ASSESS- MEDIA
(THOUSANDS)   STATUS   DATE    DATE   MENT    TYPE
                                                                     USAF-54
  ADEQUACY OF PROJECT
ENGIN-
EERING    TIME      COST
 WY-571V24179  PROJECT: AF-123C
 REMOVE  ASBESTOS BASE BLDG.
 ACCT: 0 &  M
 F  E  WARREN      AFB
 F  E  WARREN AFB
                                 WY
WY-571924179 PROJECT: AF-113C
INSTALLATION RESTORATION PROGRAM- RD/RA
ACCT: DERA
F E WARREN       AFB
F E WARREN AFB                   WY

WY-571924179 PROJECT: AF-181L
TEST SANITARY SEWER EFFLUENT
ACCT: 0 4 M
F E WARREN       AFB
F E WARREN AFB                   WY
                                                    1,000.0  ESDF
    2,100.0   ESDF
        3.6   ESDF
                           90/09 MEDIUM    AIR     ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
                           90/09  HIGH    CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
                          90/09 MEDIUM   WATER
                                                  ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
      TOTAL, STRATEGIC AIR COMMAND
             57,221.9
                                                                                            81

-------
                                 FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR  1991

                         DEPARTMENT OF AIR FORCE                 AIR FORCE SYSTEMS COMMAND
                PROJECT IDENTIFICATION
                             REQ    EST   PROJECT
          BUDGET     COMPL   COMPL  COMPL ASSESS- MEDIA
        (THOUSANDS)  STATUS  DATE   DATE  MENT    TYPE
                                                                                                                     USAF-55
                            ADEQUACY OF PROJECT
                          ENGIN-
                          EERING    TIME      COST
CA-572024504 PROJECT: AF-094TT
REMEDIAL ACTION EVALUATION AT SITE 19
ACCT: DERA
EDWARDS          AFB
EDWARDS AFB                      CA

CA-572024504 PROJECT: AF-094CC
EVALUATION OF REMEDIAL ACTION EFFORTS:
ACCT: DERA
EDWARDS          AFB
EDWARDS AFB                      CA

CA-572024504 PROJECT: AF-094EE
SITE INVESTIGATIONS OF LUST FINDINGS
ACCT: DERA
EDWARDS          AFB
EDWARDS AFB                      CA

CA-572024504 PROJECT: AF-094AAA
R.A. OPERATION * MAINTENANCE AT SITES
ACCT: 0 & M
EDWARDS          AFB
EDWARDS AFB                      CA

CA-572024504 PROJECT: AF-094EEEE
CONDUCT RI AT VARIOUS ABDN WELL SITES
ACCT: DERA
EDWARDS          AFB
EDWARDS AFB                      CA

CA-572024504 PROJECT: AF-094ZZZ
EVALUATE RA AT SITE 17
ACCT: DERA
EDWARDS          AFB
EDWARDS AFB                      CA
SITE 21
              125.0  ESDP
              120.0  ESDF
              400.0  ESDF
              100.0  ESDF
            2,000.0  PSDF
              150.0  OTHR
                                   90/09  HIGH     CERCLA    ADEQUATE  ADEQUATE   ADEQUATE
                                                           DESIGN    TIMING    ESTIMATE
90/09  HIGH    CERCLA   ADEQUATE   ADEQUATE    ADEQUATE
                         DESIGN    TIMING     ESTIMATE
                                   90/09 MEDIUM  CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
                                                           DESIGN    TIMING    ESTIMATE
                                   90/09  HIGH    CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
                                                           DESIGN    TIMING    ESTIMATE
90/09 MEDIUM   CERCLA    ADEQUATE  ADEQUATE   ADEQUATE
                         DESIGN    TIMING    ESTIMATE
                                   90/09  MEDIUM   CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
                                                           DESIGN    TIMING    ESTIMATE

-------
                                  FEDERAL  AGENCY  POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                          DEPARTMENT  OF  AIR  FORCE                AIR FORCE SYSTEMS COMMAND
                 PROJECT IDENTIFICATION
                     REQ    EST    PROJECT
  BUDGET     COMPL   COMPL   COMPL  ASSESS- MEDIA
(THOUSANDS)   STATUS   DATE    DATE   MENT    TYPE
                                                                                                                      USAF-56
                            ADEQUACY  OF  PROJECT
                          ENGIN-
                          EERING    TIME     COST
 CA-572024504 PROJECT:  AF-094EEE
 R.A.  EVALUATIONS AT SITE  16
 ACCT:  DERA
 EDWARDS           AFB
 EDWARDS  AFB                      CA

 CA-57202450'+ PROJECT:  AF-094CCC
 REMEDIAL INVESTIGATION OF NEW PHI FINDINGS
 ACCT:  OERA
 EDWARDS           AFB
 EDWARDS  AFB                      CA

 CA-572024504  PROJECT:  AF-033K
 STORMWATER TREATMENT PLANT PROJECT
 ACCT:  0  &  M
 EDWARDS           AFB
 EDWARDS  AFB                      CA

 CA-572026296  PROJECT:  AF-167C
 ASBESTOS ABATEMENT
 ACCT:  0  &  M
 LOS ANGELES AFB 6592 ABS/DE
 LOS ANGELES                      CA

 FL-572024366  PROJECT:  AF-038E
 CONTROL OF VOLATILE  ORGANIC COMPOUNDS
 ACCT: 0 4 M
 EGLIN AFB
 FORT WALTON BEACH                FL

 FL-572024366  PROJECT:  AF-093C
MAIN BASE POL AREA (1)
ACCT: DERA
 EGLIN AFB
 FORT WALTON BEACH                FL
                                                      150.0  OTHR
      500.0   OTHR
                           90/09 MEDIUM   CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
90/09 MEDIUM   CERCLA   ADEQUATE   ADEQUATE    ADEQUATE
                         DESIGN    TIMING     ESTIMATE
      138.0   ESDP   86/10   90/09 MEDIUM   WATER    ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
      346.0  OTHR
      200.0   ESDF
                          90/09 MEDIUM    AIR     ADEQUATE  ADEQUATE     HIGH
                                                   DESIGN    TIMING    ESTIMATE
                          90/09   LOW
      200.0  CMPA   88/05  90/09  HIGH
                                          AIR     ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
                                         CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE

-------
                                 FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                         DEPARTMENT OF AIR FORCE                 AIR FORCE SYSTEMS COMMAND
                PROJECT IDENTIFICATION
                                    REQ    EST   PROJECT
                 BUDGET     COMPL   COMPL  COMPL ASSESS- MEDIA
               (THOUSANDS)  STATUS  DATE   DATE  MENT    TYPE
                                                                                    USAF-57
                            ADEQUACY OF PROJECT
                          ENGIN-
                          EERING    TIME      COST
FL-572024366 PROJECT: AF-093D
SITE A-20 (10)
ACCT: DERA
EGLIN AFB
FORT WALTON BEACH
FL
FL-572024366 PROJECT: AF-093E
7TH ST BX SERVICE STATION (11)
ACCT: DERA
EGLIN AFB
FORT WALTON BEACH                FL

FL-572024366 PROJECT: AF-148C
UPGRADE OF STATIONARY STORAGE TANKS
ACCT: 0 t H
EGLIN AFB
FORT WALTON BEACH                FL

FL-572024366 PROJECT: AF-148F
INSPECT/REPAIR FUEL TANKS (ABOVE-GROUND)
ACCT: 0 * M
EGLIN AFB
FORT WALTON BEACH                FL

FL-572024366 PROJECT: AF-148D
HAZARDOUS WASTE MINIMIZATION STUDY
ACCT: 0 & M
EGLIN AFB
FORT WALTON BEACH                FL

FL-572024366 PROJECT: AF-148B
SOLID WASTE DISPOSAL
ACCT: 0 * M
EGLIN AFB
FORT WALTON BEACH                FL
                      50.0  CMPA
                     100.0  CMPA
                     183.0  ESDP
                                          90/09  HIGH    CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
                                                                   DESIGN   TIMING    ESTIMATE
                                          90/09  HIGH    CERCLA    ADEQUATE  ADEQUATE   ADEQUATE
                                                                  DESIGN    TIMING    ESTIMATE
                                          90/09 MEDIUM   SOLID    ADEQUATE  ADEQUATE   ADEQUATE
                                                         WASTE     DESIGN    TIMING    ESTIMATE
                     280.0  ESDF   90/01  90/09  HIGH     SOLID    ADEQUATE  ADEQUATE   ADEQUATE
                                                         WASTE     DESIGN    TIMING    ESTIMATE
                     100.0  ESDL
                   1,349.7  OTHR
90/09 MEDIUM   SOLID
               WASTE
90/09  HIGH    SOLID
               WASTE
                                                                 ADEQUATE  ADEQUATE   ADEQUATE
                                                                  DESIGN    TIMING    ESTIMATE
                                                                 ADEQUATE  ADEQUATE   ADEQUATE
                                                                  DESIGN    TIMING    ESTIMATE

-------
                                  FEDERAL  AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                          DEPARTMENT  OF AIR FORCE                 AIR FORCE SYSTEMS COMMAND
                 PROJECT IDENTIFICATION
                     REQ     EST   PROJECT
  BUDGET     COMPL    COMPL   COMPL ASSESS- MEDIA
(THOUSANDS)   STATUS   DATE    DATE  MENT    TYPE
                                                                                                                      USAF-58
                            ADEQUACY OF  PROJECT
                          ENGIN-
                          EERING    TIME      COST
 FL-57202-+366  PROJECT:  AF-075A
 REPLACEMENT/RETROFILL  OF  PCB ITEMS
 ACCT:  0  4  M
 EGLIN  AFB
 FORT HALTON BEACH                FL

 FL-572024366  PROJECT:  AF-051U
 HERD FACILITY  (3)
 ACCT:  DERA
 EGLIN  AFB
 FORT WALTON BEACH                FL

 FL-572024366 PROJECT:  AF-051X
 UPGRADE STORMWATER MANAGEMENT SYSTEM
 ACCT:  0 4 M
 EGLIN  AFB
 FORT WALTON BEACH                FL

 FL-572024366 PROJECT:  AF-051Y
 EROSION CONTROL PROJECT
 ACCT:  0 & M
 EGLIN  AFB
 FORT WALTON BEACH                FL

 FL-572024404 PROJECT:  AF-040G
 ASBESTOS IDENTIFICATION AND REMOVAL
 ACCT:  0 & M
 PATRICK AFB
 COCOA  BEACH                      FL

 FL-572024404 PROJECT:  AF-092C
 IRP PHASE IV/SITES 1-25
ACCT:  DERA
 PATRICK AFB
COCOA  BEACH                      FL
      960.0   ESDP    91/09   90/09  HIGH    TOXIC    ADEQUATE  ADEQUATE   ADEQUATE
                                       SUBSTANCE   DESIGN    TIMING    ESTIMATE
       10.0   ESDP   86/01  90/09  HIGH    MATER    ADEQUATE  OVERDUE    ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
    3,000.0   ESDL
      128.3   ESDL
      205.2  OTHR
    1,500.0  ESDF
90/09  LOW     WATER    ADEQUATE  ADEQUATE   ADEQUATE
                         DESIGN    TIMING    ESTIMATE
                          90/09  LOW     WATER    ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
                          90/09  HIGH     AIR     ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
90/09  HIGH    CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
                         DESIGN    TIMING    ESTIMATE

-------
                                 FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR  1991

                         DEPARTMENT OF AIR FORCE                 AIR FORCE SYSTEMS COMMAND
                PROJECT IDENTIFICATION
                     REQ    EST   PROJECT
  BUDGET     COMPL   COMPL  COMPL ASSESS- MEDIA
(THOUSANDS)  STATUS  DATE   DATE   MENT    TYPE
                                                                                                                     USAF-59
                            ADEQUACY OF  PROJECT
                          ENGIN-
                          EERING    TIME      COST
FL-572024404 PROJECT: AF-056KK
EFFLUENT DISPOSAL DISCHARGE STUDY
ACCT: 0 4 M
PATRICK AFB
COCOA BEACH                      FL

FL-572024404 PROJECT: AF-056JJ
REMEDIAL ACTION FOR STORM WATER POLLUTION
ACCT: 0 * M
PATRICK AFB
COCOA BEACH                      FL

FL-572024407 PROJECT: AF-238Y
TEST UST SYSTEMS
ACCT: 0 t M
USAF CAPE CANAVERAL AFS
PATRICK AFB                      FL

FL-572024407 PROJECT: AF-238R
NON-POINT SOURCE POLLUTION CONTROL
ACCT: 0 S M
USAF CAPE CANAVERAL AFS
PATRICK AFB                      FL

MA-572024424 PROJECT: AF-056B
REMOVE ASBESTOS VARIOUS LOCATIONS
ACCT: 0 4 M
HANSCOM AFB
BEDFORD                          MA

MA-572024424 PROJECT: AF-028H
IRP SITE 4-SANITARY LANDFILL_PHASE RA
ACCT: DERA
HANSCOM AFB
BEDFORD                          MA
      108.0  ESDF
      432.0  ESRO
      100.0  ESDP
       70.0  ESDL
      825.0  OTHR
       30.0  ESDF
91/06  LOW     WATER    ADEQUATE  ADEQUATE    ADEQUATE
                         DESIGN    TIMING    ESTIMATE
91/06 MEDIUM   WATER      NOT       NOT
                         AVAIL     AVAIL
                                                                         NOT
                                                                        AVAIL
                           90/09  HIGH    WATER    ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
                           90/09   LOW     WATER    ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
                           90/09  HIGH     AIR      UNDER    ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
                           90/09  HIGH    CERCLA    UNDER    ADEQUATE     LOW
                                                   DESIGN    TIMING    ESTIMATE

-------
                                  FEDERAL AGENCY  POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                          DEPARTMENT OF  AIR  FORCE                AIR FORCE SYSTEMS COMMAND
                 PROJECT IDENTIFICATION
                                    REQ    EST   PROJECT
                 BUDGET     COMPL   COMPL  COMPL ASSESS- MEDIA
               (THOUSANDS)  STATUS  DATE   DATE  MENT    TYPE
                                                                                    USAF-60
  ADEQUACY OF PROJECT
ENGIN-
EERING    TIME      COST
 MA-572024424 PROJECT:  AF-028F
 IRP SITE 2-PAINT WASTE DISPOSAL AREA_PHASE RA
 ACCT:  DERA
 HANSCOM AFB
 BEDFORD                         MA

 MA-572024424 PROJECT:  AF-028G
 IRP SITE-3-JET  FUEL RESIDUE/TANK SLUDGE RA
 ACCT:  DERA
 HANSCOM AFB
 BEDFORD                         MA

 MA-572024424 PROJECT:  AF-028E
 IRP SITE-1-FIRE TRAINING AREA RA
 ACCT: DERA
 HANSCOM AFB
 BEDFORD                          MA

 MA-572024424  PROJECT:  AF-001B
 REPLACE  PCB  TRANSFORMERS BASEWIDE
 ACCT: 0  4 M
 HANSCOM  AFB
 BEDFORD                          MA
MA-572024424 PROJECT: AF-082Y
REPAIR BASE SEWERS
ACCT: 0 & M
HANSCOM AFB
BEDFORD
MA-572024424 PROJECT: AF-0822
PUMP STATION RELIEF SEWER
ACCT: 0 & M
HANSCOM AFB
BEDFORD
MA
MA
                     366.7  ESDF   87/06  90/09  HIGH    CERCLA   ADEQUATE  ADEQUATE    ADEQUATE
                                                                   DESIGN    TIMING    ESTIMATE
                     366.7  ESDF   87/06  90/09  HIGH
                     366.7  ESDF
                                          90/09  HIGH
                                                         CERCLA   ADEQUATE  ADEQUATE    ADEQUATE
                                                                   DESIGN    TIMING    ESTIMATE
                                                         CERCLA   ADEQUATE  ADEQUATE    ADEQUATE
                                                                   DESIGN    TIMING    ESTIMATE
                     200.0  ESDF   89/07  90/09  HIGH    TOXIC     UNDER    ADEQUATE    ADEQUATE
                                                       SUBSTANCE   DESIGN    TIMING    ESTIMATE
                                                      200.0  ESDP   91/01  90/09  HIGH    WATER
                                                      £50.0  ESDP   91/12  90/09  HIGH    WATER
                                                                   UNDER    ADEQUATE    ADEQUATE
                                                                   DESIGN    TIMING    ESTIMATE
                                                                    NOT       NOT
                                                                   AVAIL     AVAIL
                     NOT
                    AVAIL

-------
                                  FEDERAL AGENCY  POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                         DEPARTMENT OF AIR FORCE                AIR FORCE SYSTEMS COMMAND
                PROJECT IDENTIFICATION
                     REQ    EST   PROJECT
  BUDGET     COMPL   COMPL  COMPL ASSESS- MEDIA
(THOUSANDS)  STATUS  DATE   DATE  MENT    TYPE
                                                                     USAF-61
  ADEQUACY OF PROJECT
ENGIN-
EERING    TIME      COST
TN-572024044 PROJECT: AF-10SD
ASBESTOS HEALTH HAZARD ABATEMENT
ACCT: 0 » M
ARNOLD ENG DEV CTR
ARNOLD A.F.B.                    TN

TN-572024044 PROJECT: AF-108M
INSTALL PRODUCT REC SYS - FUEL FARMS
ACCT: 0AM
ARNOLD ENG DEV CTR
ARNOLD A.F.B.                    TN

TN-572024
-------
                                  FEDERAL AGENCY  POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                          DEPARTMENT OF  AIR  FORCE                 AIR FORCE SYSTEMS COMMAND
                 PROJECT IDENTIFICATION
                     REQ     EST   PROJECT
  BUDGET     COMPL    COMPL   COMPL ASSESS- MEDIA
(THOUSANDS)   STATUS   DATE    DATE  MENT    TYPE
                                                                                                                     USAF-62
  ADEQUACY OF PROJECT
ENGIN-
EERING    TIME      COST
 TN-572024044 PROJECT:  AF-097F
 IRP PHASE IV SITES 2-9,  11,  12,  18,  19
 ACCT:  DERA
 ARNOLD ENG DEV CTR
 ARNOLD A.F.B.                    TN

 TN-572024044 PROJECT:  AF-097C
 IRP PHASE IV SITE  1
 ACCT:  DERA
 ARNOLD ENG DEV CTR
 ARNOLD A.F.B.                    TN

 TN-572024044 PROJECT:  AF-097D
 IRP  PHASE  IV-FIRE  TRAINING AREA  (SITE 10  )
 ACCT:  DERA
 ARNOLD  ENG DEV  CTR
 ARNOLD  A.F.B.                    TM

 TN-572024044 PROJECT:  AF-097FF
 IRP GROUNDWATER MANAGEMENT PLAN
 ACCT: DERA
 ARNOLD  ENG  DEV CTR
 ARNOLD  A.F.B.                    TN

 TN-572024044 PROJECT:  AF-002I
 PCB-EQUIPMENT REMEDIATION
 ACCT: 0 &  M
 ARNOLD  ENG DEV CTR
ARNOLD A.F.B.                    TN

TN-572024044 PROJECT:  AF-300P
MODIFY RETENTION RESERVOIR INLET/OUTLET
ACCT: 0 & M
ARNOLD  ENG DEV CTR
ARNOLD A.F.B.                    TN
                                                    1,000.0  ESDP
       10.0   ESDP
       10.0   ESDP
      205.0   OTHR
      50.0   ESDL
      271.3  OTHR
                           90/09  HIGH    CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
                           90/09  HIGH    CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
                          90/09  HIGH    CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
                          90/09 MEDIUM   CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
                          90/09  LOW     TOXIC    ADEQUATE  ADEQUATE   ADEQUATE
                                       SUBSTANCE   DESIGN    TIMING    ESTIMATE
                          90/09  LOW     WATER    ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE

-------
                                 FEDERAL ASENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR  1991

                         DEPARTMENT OF AIR FORCE                 AIR FORCE SYSTEMS COMMAND
                PROJECT IDENTIFICATION
                     REQ    EST   PROJECT
  BUDGET     COMPL   COMPL  COMPL ASSESS-  MEDIA
(THOUSANDS)  STATUS  DATE    DATE   MENT    TYPE
                                                                                                                     USAF-63
  ADEQUACY OF PROJECT
ENGIN-
EERING    TIME      COST
TX-572024303 PROJECT: AF-113B
RETROFIT/RETROFILL OF PCB TRANSFORMERS
ACCT: 0 * M
BROOKS AFB
SAN ANTONIO                      TX
    1,450.0  ESDP   90/09  90/09  MEDIUM   TOXIC    ADEQUATE  OVERDUE    ADEQUATE
                                        SUBSTANCE   DESIGN    TIMING    ESTIMATE
      TOTAL, AIR FORCE SYSTEMS COMMAND
              19,463.5

-------
                                  FEDERAL  AGENCY  POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                          DEPARTMENT  OF  AIR  FORCE                 TACTICAL AIR COMMAND
                 PROJECT IDENTIFICATION
                     REQ     EST    PROJECT
  BUDGET     COMPL    COMPL   COMPL  ASSESS- MEDIA
(THOUSANDS)   STATUS   DATE    DATE   MENT    TYPE
                                                                     USAF-64
    ADEQUACY OF PROJECT
  ENGIN-
  EERING    TIME      COST
 AZ-572124055 PROJECT:  AF-008D                          50.0  ESDF
 REMEDIAL ACTION INSTALLATION RESTORATION PR06RA
 ACCT:  DERA
 DAVIS  MONTHAN AFB
 TUCSON                          AZ

 CA-572124453 PROJECT:  AF-2146                          75.0  ESRO
 ASBESTOS SURVEY/ABATEMENT
 ACCT:  0  8 M
 GEORGE AFB
 GEORGE AFB  CA                   CA

 CA-572124453 PROJECT:  AF-020C                         500.0  ESDF
 REMEDIAL  ACTION INSTALLATION RESTORATION PROGRA
 ACCT: 0  t  M
 GEORGE AFB
 GEORGE AFB   CA                   CA

 CA-572124453  PROJECT:  AF-0226
 FIRE FIGHTING TRAINING FACILITY CLOSURES
 ACCT: DERA
 GEORGE AFB
 GEORGE AFB  CA                   CA

 CA-572124453 PROJECT: AF-034M                          90.0  ESDF
 PRECISION TEST UNDERGROUND STORAGE TANKS
 ACCT: 0 4 M
 GEORGE AFB
 GEORGE AFB  CA                   CA

 FL-572124124 PROJECT: AF-070D                         108.0  ESDF
UPGRADE HAZD.MATERIAL STORAGE WAREHOUSE.
ACCT: 0 t M
TYNDALL AFB
 PANAMA CITY                      FL
                           90/09  HIGH    CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
                           90/09 MEDIUM    AIR     ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
                          90/09  HIGH    CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
      60.0   ESDF   91/04  90/09  HIGH    SOLID    ADEQUATE  ADEQUATE   ADEQUATE
                                         WASTE     DESIGN    TIMING    ESTIMATE
                          90/09  HIGH    WATER
                          90/09 MEDIUM   SOLID
                                         WASTE
                                                  ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
ADEQUATE  ADEQUATE   ADEQUATE
 DESIGN    TIMING    ESTIMATE

-------
                                 FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                         DEPARTMENT OF AIR FORCE                 TACTICAL AIR COMMAND
                PROJECT IDENTIFICATION
                     REQ    EST   PROJECT
  BUDGET     COMPL   COMPL  COMPL ASSESS- MEDIA
(THOUSANDS)  STATUS  DATE   DATE  MENT    TYPE
                                                                                                                     USAF-65
  ADEQUACY OF PROJECT
ENGIN-
EERING    TIME      COST
FL-572124582 PROJECT: AF-128E                         250.0  ESDF
VOC REDUCTION
ACCT: 0 t M
MACDILL          AFB
MACDILL AFB                      FL

GA-572124106 PROJECT: AF-012F                          50.0  ESDF
RI/FS QUANTIFICATION
ACCT: DERA
MOODY  AFB
VALDOSTA                         GA

ID-572124557 PROJECT: AF-013D                          50.0  ESDF
RI/FS INSTALLATION REST. PRO.
ACCT: DERA
MOUNTAIN HOME AFB
MOUNTAIN HOME AFB                ID

ID-572124557 PROJECT: AF-013E                         100.0  ESDF
REMEDIAL ACTION INSTALLATION RESTORATION PROGRA
ACCT: DERA
MOUNTAIN HOME AFB
MOUNTAIN HOME AFB                ID

LA-572124452 PROJECT: AF-039E                          50.0  ESDF
REMEDIAL ACTION INSTALLATION RESTORATION PROGRA
ACCT: DERA
ENGLAND          AFB
ENGLAND AFB                      LA

LA-572124452 PROJECT: AF-039D                          50.0  ESDF
REMEDIAL ACTION
ACCT: DERA
ENGLAND          AFB
ENGLAND AFB                      LA
                           90/09  HIGH      AIR      ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
                           90/09 MEDIUM   CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
                           90/09 MEDIUM   CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
                           90/09 MEDIUM    CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
                           90/09 MEDIUM   CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
                           90/09  MEDIUM   CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE

-------
                                  FEDERAL A6ENCY  POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                          DEPARTMENT OF AIR  FORCE                TACTICAL AIR COMMAND
                 PROJECT IDENTIFICATION
                                    REQ    EST   PROJECT
                 BUDGET     COMPL   COMPL  COMPL ASSESS- MEDIA
               (THOUSANDS)  STATUS  DATE   DATE  MENT    TYPE
                                                                                                                      USAF-66
    ADEQUACY OF PROJECT
  ENGIN-
  EERING    TIME      COST
 NM-572124422 PROJECT:  AF-0-+OE
 IRP INVESTIGATIONS AND REMEDIAL  ACTIONS
 ACCT:  DERA
 USAF HOLLOMAN AFB
 HOLLOMAN AFB                    NM

 NM-572124422 PROJECT:  AF-015E
 GROUND  WATER MONITORING
 ACCT: 0 &  M
 USAF HOLLOMAN AFB
 HOLLOMAN AFB                    MM

 NV-57212<+110 PROJECT:  AF-085I
 RCRA FACILITY ASSESSMENT AND INVESTIGATION
 ACCT: 0AM
 NELLIS           AFB
 NELLIS  AFB                       NV

 SC-572124466  PROJECT:  AF-038F
 BLDG 105 CONTAMINATION SITE INVESTIGATION
 ACCT: DERA
 SHAW             AFB
 SHAW AF BASE
SC-572124466 PROJECT: AF-077C
REPLACE OLD FUEL TANKS
ACCT: 0 & M
SHAW             AFB
SHAW AF BASE

SC-572124466 PROJECT: AF-1520
WATEREE WASTEWATER SYSTEM
ACCT: 0 & M
SHAW             AFB
SHAW AF BASE
SC
SC
SC
                                                      200.0  ESDF
                     200.0  OTHR
                     100.0  OTHR
                                          90/09  HIGH    CERCLA   ADEQUATE  ADEQUATE    ADEQUATE
                                                                   DESIGN    TIMING    ESTIMATE
                                          90/09 MEDIUM   SOLID    ADEQUATE   ADEQUATE    ADEQUATE
                                                         WASTE     DESIGN    TIMING    ESTIMATE
                                          90/09  HIGH    SOLID    ADEQUATE   ADEQUATE    ADEQUATE
                                                         WASTE     DESIGN    TIMING    ESTIMATE
                     200.0  OTHR   91/01  90/09 MEDIUM   CERCLA   ADEQUATE   ADEQUATE    ADEQUATE
                                                                   DESIGN    TIMING    ESTIMATE
                                                      125.0  ESRO
                     250.0  ESDF
                                          90/09 MEDIUM   SOLID
                                                         WASTE
                                          90/09 MEDIUM   WATER
ADEQUATE  ADEQUATE   ADEQUATE
 DESIGN    TIMING    ESTIMATE
                                                                  ADEQUATE   ADEQUATE    ADEQUATE
                                                                   DESIGN    TIMING    ESTIMATE

-------
                                 FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                         DEPARTMENT OF AIR FORCE                 TACTICAL AIR COMMAND
                PROJECT IDENTIFICATION
                                    REQ    EST   PROJECT
                 BUDGET     COMPL   COMPL  COMPL ASSESS- MEDIA
               (THOUSANDS)  STATUS  DATE   DATE  MENT    TYPE
                                                                                                                     USAF-67
                            ADEQUACY OF PROJECT
                          ENGIN-
                          EERING    TIME      COST
SC-572124821 PROJECT: AF-036E
RI/FS IRP QUANTIFICATION
ACCT: DERA
MYRTLE BEACH
MYRTLE BEACH AFB
SC
TX-572124188 PROJECT: AF-065G
CONST HAZARDOUS WASTE STORAGE TANKS
ACCT: 0 4 M
BERGSTROM AIR FORCE BASE
AUSTIN                           TX
                      50.0  ESDF   91/01  90/09 MEDIUM   CERCLA   ADEQUATE   ADEQUATE    ADEQUATE
                                                                   DESIGN    TIMING     ESTIMATE
                     140.0  PSDF
90/09 MEDIUM   SOLID    ADEQUATE  ADEQUATE   ADEQUATE
               WASTE     DESIGN    TIMING    ESTIMATE
      TOTAL, TACTICAL AIR COMMAND
                              2,698.0
                                                           20

-------
                                  FEDERAL AGENCY  POLLUTION  ABATEMENT PLAN FOR FISCAL YEAR 1991

                          DEPARTMENT OF  AIR  FORCE                ALASKAN AIR COMMAND
                 PROJECT IDENTIFICATION
                     REQ    EST    PROJECT
  BUDGET     COMPL   COMPL   COMPL  ASSESS- MEDIA
(THOUSANDS)   STATUS  DATE    DATE   MENT    TYPE
                                                                     USAF-68
                            ADEQUACY OF PROJECT
                          ENGIN-
                          EERING    TIME      COST
 AK-572728633 PROJECT:  AF-166A
 REMEDIAL INVESTIGATION/FEASIBILITY  STUDY
 ACCT:  DERA
 CAPE ROMAN.?OF AFS
 ELMENDORF AFB                   AK

 AK-572728639 PROJECT:  AF-183A
 REMEDIAL INVESTIGATION/FEASIBILITY  STUDY
 ACCT:  DERA
 COLD BAY AFS
                                 AK

 AK-572728646  PROJECT:  AF-006D
 REPAIR/SEAL  ASBESTOS INSULATION 6203
 ACCT: 0  t  M
 EIELSON  AIR  FORCE BASE
 EIELSON  AFB                      AK

 AK-5727286<+6  PROJECT:  AF-030B
 REMEDIAL  INVESTIGATION/FEASIBILITY  STUDY
 ACCT: DERA
 EIELSON AIR  FORCE BASE
 EIELSON AFB                      AK

 AK-572728646  PROJECT: AF-030D
 REMEDIAL INVESTIGATION/FEASIBILITY STUDY
 ACCT: DERA
 EIELSON AIR FORCE BASE
 EIELSON AFB                      AK

AK-572728646  PROJECT: AF-10K
RENOVATE SEWAGE TREATMENT PUNT
ACCT: MILCON
 EIELSON AIR FORCE BASE
 EIELSON AFB                      AK
                                                       200.0  ESDP
      200.0   ESDP
       80.0   ESDF
    2,500.0   ESDF
                           90/09  HIGH    CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
                           90/09 MEDIUM   CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
                           90/09  HIGH     AIR     ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
90/09  HIGH    CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
                         DESIGN    TIMING    ESTIMATE
     flOO.O  ESDF   92/09  90/09  HIGH
   12,400.0  ESDF
90/09  HIGH
                                         CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
                                         WATER    ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE

-------
                                 FEDERAL ASENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                         DEPARTMENT OF AIR FORCE                 ALASKAN AIR COMMAND
                PROJECT IDENTIFICATION
                     REQ    EST   PROJECT
  BUDGET     COMPL   COMPL  COMPL ASSESS- MEDIA
(THOUSANDS)  STATUS  DATE   DATE  MENT    TYPE
                                                                                                                     USAF-69
                            ADEQUACY OF PROJECT
                          ENGIN-
                          EERING    TIME      COST
AK-572728649 PROJECT: AF-029B
RI/FS.
ACCT: DERA
ELMENDORF AFB
ELMENDORF AFB                    AK

AK-572728649 PROJECT: AF-011N
6981 ST LAGOON UPGRADE
ACCT: 0 » M
ELMENDORF AFB
ELMENDORF AFB                    AK

AK-5727Z8649 PROJECT: AF-011I
FLT LINE OIL/MAT SEP.
ACCT: 0 * M
ELMENDORF AFB
ELMENDORF AFB                    AK

AK-572728654 PROJECT: AF-165A
IDENIFY/DISPOSE OF ACCUMULATED WASTE DRUMS
ACCT: DERA
FORT YUKON AFS
ELMENDORF                        AK

AK-572728655 PROJECT: AF-123B
RI/FS AND RAP
ACCT: DERA
GALENA AIRPORT
GALENA                           AK

AK-572728662 PROJECT: AF-167A
REMEDIAL INVESTIGATION/FEASIBILITY STUDY
ACCT: DERA
INDIAN MOUNTAIN AFS
ELMENDORF AFB AK                 AK
      900.0  ESDF
90/09  HIGH    CERCLA   ADEQUATE  ADEQUATE    ADEQUATE
                         DESIGN    TIMING    ESTIMATE
       65.0  ESDP   89/12  90/12 MEDIUM   MATER     ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
      150.0  ESDF
90/09 MEDIUM   WATER    ADEQUATE  ADEQUATE    ADEQUATE
                         DESIGN    TIMING    ESTIMATE
      475.0  ESDP   89/01   90/09  HIGH    CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
       50.0  ESDF
      475.0  ESDP
90/09 MEDIUM   CERCLA   ADEQUATE   ADEQUATE   ADEQUATE
                         DESIGN    TIMING    ESTIMATE
90/09 MEDIUM   CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
                         DESIGN   TIMING    ESTIMATE

-------
                                  FEDERAL  AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                          DEPARTMENT  OF  AIR FORCE                 ALASKAN AIR COMMAND
                 PROJECT IDENTIFICATION
                     REQ     EST   PROJECT
  BUDGET     COMPL   COMPL   COMPL ASSESS- MEDIA
(THOUSANDS)   STATUS   DATE    DATE  MENT    TYPE
                                                                     USAF-70
                            ADEQUACY  OF  PROJECT
                          ENGIN-
                          EERING    TIME     COST
 AK-572728664 PROJECT:  AF-175A
 FACILITIES DEMOLITION
 ACCT:  DERA
 KALAKAKET CREEK
 ELMENDORF AFB AK                 AK

 AK-572728669 PROJECT:  AF-124B
 IRP  PHASE II (OR RI/FS).
 ACCT:  DERA
 KING SALMON  AIRPORT
 ELMENDORF AFB, AK                AK

 AK-572728679 PROJECT:  AF-185A
 REMEDIAL  INVESTIGATION/FEASIBILITY STUDY
 ACCT: DERA
       MURPHY DOME AFS
 ELMENDORF  AFB                    AK

 AK-572728705  PROJECT: AF-125B
 REMEDIAL  INVESTIGATION/FEASIBILIY STUDY
 ACCT: DERA
 SHEMYA AFB
 ELMENDORF AFB AK                 AK

 AK-572728705  PROJECT: AF-020N
 SEWAGE TREATMENT PLANT
 ACCT: MILCON
 SHEMYA AFB
 ELMENDORF AFB AK                 AK

AK-572728709 PROJECT: AF-168A
REMEDIAL INVESTIGATION/FEASIBILITY STUDY
ACCT: DERA
SPARREVOHN AFS
ELMENDORF AFB AK                 AK
    1,850.0   OTHR
      400.0   ESDF
      150.0   ESDP
      400.0   ESDP
    2,750.0   INOV
      150.0   ESDP
90/09  LOW     SOLID     ADEQUATE   ADEQUATE   ADEQUATE
               WASTE      DESIGN    TIMING    ESTIMATE
                           90/09  HIGH    CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
                          90/09 MEDIUM   CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
                          90/09 MEDIUM   CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
                          90/09  HIGH    WATER    ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
                          90/09  HIGH    CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE

-------
                                 FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR  1991

                         DEPARTMENT OF AIR FORCE                 ALASKAN AIR COMMAND
                PROJECT IDENTIFICATION
                     REQ    EST   PROJECT
  BUDGET     COMPL   COMPL  COMPL ASSESS- MEDIA
(THOUSANDS)  STATUS  DATE   DATE  MENT    TYPE
                                                                                                                     USAF-71
                            ADEQUACY OF  PROJECT
                          ENGIN-
                          EERING    TIME      COST
AK-572728742 PROJECT: AF-171A
REMEDIAL INVESTIGATION/FEASIBILITY STUDY
ACCTi DERA
KOTZEBUE AFS
ELMENDORF AFB AK                 AK
    1*500.0  ESDP
90/09  HIGH
CERCLA   ADEQUATE  ADEQUATE
          DESIGN    TIMING
ADEQUATE
ESTIMATE
      TOTAL, ALASKAN AIR COMMAND
              25,495.0
                 19

-------
                                  FEDERAL  AGENCY  POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                          DEPARTMENT OF  AIR  FORCE                 AIR NATIONAL GUARD
                 PROJECT IDENTIFICATION
                                    REQ    EST   PROJECT
                 BUDGET     COMPL   COMPL  COMPL ASSESS-  MEDIA
               (THOUSANDS)  STATUS  DATE   DATE  MENT    TYPE
                                                                                    USAF-72
                            ADEQUACY  OF  PROJECT
                          ENGIN-
                          EERING    TIME      COST
 AL-572825919 PROJECT:  AF-151A
 IRP FOR DANNELLY  FIELD AN6B
 ACCT:  DERA
 DANNELLY FIELD  ANGB
 MONTGOMERY
AL
 CO-572825644  PROJECT: AF-024B
 INSTALLATION  RESTORATION PROGRAM
 ACCT:  DERA
 BUCKLEY ANGB
 AURORA                          CO

 DE-572824274  PROJECT: AF-158A
 IRP FOR DELAWARE ANG
 ACCT:  DERA
 GREATER WILMINGTON AIRPORT
 NEW CASTLE                       DE

 MA-572824487  PROJECT: AF-026B
 INSTALLATION RESTORATION PROGRAM
 ACCT: DERA
 OTIS ANS BASE
 FALMOUTH                         MA

 MI-572824262 PROJECT: AF-027C
 INSTALLATION RESTORATION PROGRAM
 ACCT: DERA
 SELFRIDGE ANSB
 MOUNT CLEMENS                    MI

MI-572825903 PROJECT: AF-141B
 IRP
ACCT: DERA
 PHELPS. COLLINS AP
ALPENA                           MI
                                                      100.0  ESDF
                                                      400.0  ESDF
                   1,000.0  ESDF
                   6,000.0  ESDF
                   3,000.0   ESDF
                   1,500.0   ESDF
                                          90/09 MEDIUM    CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
                                                                  DESIGN    TIMING    ESTIMATE
                                          90/09 MEDIUM    CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
                                                                  DESIGN    TIMING    ESTIMATE
                                          90/09 MEDIUM   CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
                                                                  DESIGN    TIMING    ESTIMATE
90/09  HIGH    CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
                         DESIGN    TIMING    ESTIMATE
90/09 MEDIUM   CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
                         DESIGN    TIMING    ESTIMATE
90/09  HIGH    CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
                         DESIGN    TIMING    ESTIMATE

-------
                                 FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                         DEPARTMENT OF AIR FORCE                 AIR NATIONAL GUARD
                PROJECT IDENTIFICATION
                     REQ    EST   PROJECT
  BUDGET     COMPL   COMPL  COMPL ASSESS- MEDIA
(THOUSANDS)  STATUS  DATE   DATE  MENT    TYPE
                                                                                                                      USAF-73
                            ADEQUACY OF PROJECT
                          ENGIN-
                          EERING    TIME      COST
NY-572824273 PROJECT: AF-120G
CONSTRUCT OIL/WATER SEPARATOR.
ACCT: 0 & M, ANG
NIAGARA FALLS    IAP
NIAGARA FALLS                    NY

PA-572828469 PROJECT: AF-153A
IRP
ACCT: DERA
PITTSBURGH IAP
PITTSBURGH                       PA

SC-572825160 PROJECT: AF-246G
ADD / ALTER SEWAGE TREATMENT PLANT
ACCT: MILCON, ANG
MCENTIRE ANG BASE
EASTOVER                         SC

VT-572824294 PROJECT: AF-138C
INSTALLATION RESTORATION PROGRAM
ACCT: DERA
BURLINGTON ANGB
                                 VT

WI-572825877 PROJECT: AF-037A
REPAIR WATER DISTRIBUTION SYSTEM
ACCT: 0 4 M
VOLK FIELD
CAMP DOUGLAS                     WI
       60.0  OTHR
       25.0  ESDF
      130.0  ESDF
      100.0  ESDF
      850.0  ESRO
90/09 MEDIUM   WATER    ADEQUATE  ADEQUATE   ADEQUATE
                         DESIGN    TIMING    ESTIMATE
                           90/09 MEDIUM   CERCLA     NOT       NOT
                                                    AVAIL     AVAIL
                                               NOT
                                              AVAIL
90/09 MEDIUM   WATER    ADEQUATE  ADEQUATE    ADEQUATE
                         DESIGN    TIMING    ESTIMATE
90/09 MEDIUM   CERCLA    UNDER    ADEQUATE   ADEQUATE
                         DESIGN    TIMING    ESTIMATE
                           90/09  HIGH    DRINKING  ADEQUATE  ADEQUATE   ADEQUATE
                                         WATER     DESIGN    TIMING    ESTIMATE
      TOTAL, AIR NATIONAL GUARD
                                                              13,165.0
                                                                                            11

-------
                                  FEDERAL AGENCY  POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                          DEPARTMENT OF  AIR  FORCE                 AIR FORCE ACADEMY
                 PROJECT IDENTIFICATION
                     REQ     EST    PROJECT
  BUDGET     COMPL    COMPL   COMPL  ASSESS- MEDIA
(THOUSANDS)   STATUS   DATE    DATE   MENT    TYPE
                                                                                                                     USAF-74
   ADEQUACY OF PROJECT
 ENGIN-
 EERING    TIME      COST
 CO-572924928 PROJECT:  AF-150C
 ASBESTOS REMOVAL PROJECTS
 ACCT:  0 4 M
 US AIR FORCE ACADEMY
 COLORADO SPRINGS
                                 CO
 CO-572924928  PROJECT: AF-100B
 INSTALLATION  RESTORATION PROGRAM, 11 SITES
 ACCT:  DERA
 US  AIR FORCE  ACADEMY
 COLORADO SPRINGS                 CO

 CO-572924928  PROJECT: AF-007D
 HAZARDOUS WASTE DISPOSAL/MANAGEMENT
 ACCT:  0 4 M
 US AIR FORCE  ACADEMY
 COLORADO SPRINGS                 CO

 CO-572924928  PROJECT: AF-007C
 UNDERGROUND STORAGE TANK UPGRADES
 ACCT: 0 & M
US AIR FORCE ACADEMY
COLORADO SPRINGS                 CO

CO-572924928 PROJECT: AF-039F
 PCB REMOVALS
ACCT: 0 4 M
US AIR FORCE ACADEMY
COLORADO SPRINGS                 CO
                                                      500.0  OTHR
                                                      500.0  OTHR
      300.0   OTHR
      500.0   OTHR
                           90/09  HIGH     AIR     ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
                                                                           90/09 MEDIUM   CERCLA
                                                    NOT
                                                   AVAIL
                          90/10 MEDIUM   SOLID
                                         WASTE
 NOT
AVAIL
           NOT
          AVAIL
                           90/09 MEDIUM   SOLID      NOT       NOT
                                         WASTE     AVAIL     AVAIL
 NOT
AVAIL
            NOT
           AVAIL
                      NOT
                     AVAIL
 NOT
AVAIL
     500.0   ESDF   90/10  90/09  LOW     TOXIC    ADEQUATE  ADEQUATE   ADEQUATE
                                       SUBSTANCE   DESIGN    TIMING    ESTIMATE
      TOTAL, AIR FORCE ACADEMY
               2,300.0

-------
                                 FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                         DEPARTMENT OF AIR FORCE                 PACIFIC AIR FORCES
                PROJECT IDENTIFICATION
                     REQ    EST   PROJECT
  BUDGET     COMPL   COMPL  COMPL ASSESS- MEDIA
(THOUSANDS)  STATUS  DATE   DATE  MENT    TYPE
                                                                                                                     USAF-75
                            ADEQUACY OF  PROJECT
                          ENGIN-
                          EERING    TIME     COST
HI-573028722 PROJECT: AF-076C
IRP PH IV: SATELLITE INSTALLATIONS
ACCT: DERA
HICKAM AFB
HONOLULU                         HI

HI-573028722 PROJECT: AF-076D
IRP PH IV: HICKAM AFB & WHEELER AFB
ACCT: DERA
HICKAM AFB
HONOLULU                         HI

HI-573028722 PROJECT: AF-105A
CORROSION CONTROL, VARIOUS LOCATIONS
ACCT: 0 * M
HICKAM AFB
HONOLULU                         HI

*     TOTAL, PACIFIC AIR FORCES
      TOTAL, DEPARTMENT OF AIR FORCE
    1,300.0  ESDF
      740.0  ESDF
      139.3  PSDF
               2,179.3
             243,275.1
90/09  HIGH    CERCLA   ADEQUATE   ADEQUATE   ADEQUATE
                         DESIGN   TIMING    ESTIMATE
                           90/09  HIGH     CERCLA   ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
90/09  HIGH    SOLID    ADEQUATE  ADEQUATE   ADEQUATE
               WASTE     DESIGN    TIMING    ESTIMATE
                  3


                362

-------
DLA

-------
DEFENSE LOGISTICS
     AGENCY

-------
                                                       DLA-1
THE DEFENSE LOGISTICS AGENCY

The Defense Logistics Agency (DLA) has the mission of providing
support to the military services, other Defense Department
components, Federal civil agencies, foreign governments, and
others. They provide for materiel commodities and supplies,
including weapons systems, logistics services directly associated
with the supply management function, contract administration
services, and other support services. DLA carries out these
functions through 25 primary level field activities and their
subordinate activities, grouped under either the six Defense
Supply Centers, the six Defense Service Centers, the four Defense
Depots, or the nine Defense Contract Administration Service
Regions.
AGENCY POLLUTION ABATEMENT PLAN FOR FY 1991

The DLA proposed 33 projects totalling approximately $26 million
in their A-106 environmental plan for FY 1991.

EPA evaluated the projects submitted by DLA according to the
impact on the local environment that would result if the projects
were not funded in FY 1991.  EPA rated 17 projects (budgeted at
$16 million)  as having "High" environmental impact and another 16
projects ($10 million) as having a "Medium" rating.  No ratings
of "Low" environmental impact were assigned to DLA projects.

The distribution of projects among compliance classes for DLA
indicates that there are 7 Class I projects, those in the plan
for current compliance reasons, or 21 percent of the total number
of projects in the FY 1991 plan.  The 20 Class II projects, those
in the plan to permit the agency to meet near-term future
compliance deadlines, make up 61 percent of the total; and the 6
Class III projects, those in the plan for other environmental
reasons, make up the remaining 18 percent of the total.

The projects proposed by DLA in their FY 1991 plan are spread
over seven different environmental media programs in the
following pattern:  25 projects in the RCRA area, costing $21
million, making this the single largest group of projects in the
plan.   This is followed by 3 projects in the CERCLA area, costing
$4 million, making this the second largest group of projects.
The plan also included one project in each of the air, water,
drinking water, toxics, and multi-media areas, for a cost of $1.7
million.

-------
                                                                          DLA-2
                         TOTAL NUMBER OF POLLUTION ABATEMENT
                          PROJECTS PROPOSED FOR FY 1987 - 91
                              DEFENSE LOGISTICS AGENCY
 w
 Ul
 I
 IL
 o
 a.
 ui
 a
                   FY87
FY88
                                              FY89
                          FY90
                                                                       FY91
DLAFIG1
                                          FISCAL YEARS

-------
                                                                             DLA-3
                          TOTAL DOLLARS REQUESTED FOR POLLUTION
                           ABATEMENT PROJECTS FOR FY 1987 - 91
                               DEFENSE LOGISTICS AGENCY
       40000
       30000-
 o
 o
 o
 M
 tt.
 O
 O
       20000-
        10000-
OLA FIG 2
                  FY87
FY88
    FY89

FISCAL YEARS
                                                            FY90
                                                                           FY91

-------
                       TOTAL NUMBER AND DOLLARS PROPOSED FOR
                        POLLUTION ABATEMENT NEEDS FOR FY 1991
                              DEFENSE LOGISTICS AGENCY
                                                                       26392.1
            10
                            100
OLA FIG 3
	1	
      1000


 PROJECTS

 DOLLARS ($000)
	1	
10000
100000

-------
                          TOTAL NUMBER AND DOLLARS PROPOSED FOR
                            CLASS I, II, III PROJECTS FOR FY 1991
                                DEFENSE LOGISTICS AGENCY
     CLASS I
                                                                        5449.2
    CLASS II
    CLASS III
                                                                               15492.9
                                                                        5450
                           10
100
1000
                               10000
100000
DLA FIG 4
    PROJECTS
    DOLLARS ($000)

-------
                                                                                DLA-6
DLA  - TABLE 1: EPA EVALUATION OF THE ENVIRONMENTAL IMPACT OF PROPOSED
                POLLUTION ABATEMENT PROJECTS FOR FISCAL YEAR 1991
                INCLUDING NUMBER AND COST
                      DEFENSE LOGISTICS ASENCY
COMPLIANCE *
STATUS

ESDP
ESDF
PSDF
OTHR
GRAND TOTAL
HIGH
PROJECTS
COST
($1,000)
6
4,690.0
9
8,668.7
1
250.0
1
2,700.0
17
16,308.7
MEDIUM
PROJECTS
COST
($1,000)
1
759.2
9
5,574.2
1
1,000.0
5
2,750.0
16
10,083.4
LOU
PROJECTS
COST
($1,000)
0
0.0
0
0.0
0
0.0
0
0.0
0
0.0
TOTAL
PROJECTS
COST
($1,000)
7
5,449.2
18
14,242.9
2
1,250.0
6
5,450.0
33
26,392.1
SEE SECTION III FOR  DEFINITIONS OF COMPLIANCE STATUS CATEGORIES

-------
       DLA  -  TABLE  Z:
                          NUMBER  AND  DOLLAR  AMOUNT OF  POLLUTION ABATEMENT PROJECTS FOR FEDERAL INSTALLATIONS
                          PROPOSED  BY MAJOR  COMMAND/BUREAU FOR FISCAL YEAR  1991 BY CLASS/COMPLIANCE STATUS.*

                                         DEFENSE LOGISTICS AGENCY
                                                                                                                          DLA-7
MAJOR COMMAND/
BUREAU

USD LA
TOTAL
CMPA
PROJECTS
COST
($1,000)


CLASS I
INOV
PROJECTS
COST
($1,000)


ESDP
PROJECTS
COST
($1,000)
7
5,449.2
	 	 	
7
5,449.2
CLASS
ESDF
PROJECTS
COST
($1,000)
18
14,242.9
18
14,242.9
II
PSDF
PROJECTS
COST
($1,000)
	
2
1,250.0
	
2
1,250.0
CLASS
ESRO ESRE
PROJECTS PROJECTS
COST COST
($1,000) ($1,000)
III
ESDL
PROJECTS
COST
($1,000)
	 	
OTHR
	
PROJECTS
COST
($1,000)
6
5,450.0
	

6
5,450.0
TOTAL
PROJECTS
COST
($1,000)
33
26,392.1
33
26,392.1
* SEE SECTION III FOR DEFINITIONS OF COMPLIANCE STATUS CATEGORIES

-------
                                                                                                         DUA-8
OLA  - TABLE 3: NUMBER AND  DOLLAR AMOUNT OF POLLUTION ABATEMENT PROJECTS PROPOSED BY
                MAJOR COMMAND/BUREAU AND ENVIRONMENTAL MEDIA FOR FISCAL YEAR 1991

                                 DEFENSE  LOGISTICS AGENCY
MAJOR COMMAND/
BUREAU AIR

USD LA
TOTAL
PROJECTS
COST
($1,000)
1
500.0
1
500.0
DRINKING
WATER NOISE
PROJECTS PROJECTS
COST COST
($1,000) ($1,000)
1
150.0
1
150.0
PESTICIDES RADIATION CERCLA
PROJECTS PROJECTS PROJECTS
COST COST COST
($1,000) ($1,000) ($1,000)
3
4000.0
3
4000.0
RCRA
PROJECTS
COST
($1,000)
25
20740.1
25
20740.1
TSCA
PROJECTS
COST
($1,000)
1
500.0
1
500.0
MATER
PROJECTS
COST
($1,000)
1
2.0
1
2.0
MULTI
PROJECTS
COST
($1,000)
1
500.0
1
500.0
TOTAL
PROJECTS
COST
($1,000)
33
26392.1
33
26392.1

-------
                                 FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                         DEFENSE LOGISTICS AGENCY                DEFENSE LOGISTICS AGENCY
                PROJECT IDENTIFICATION
                     REQ    EST   PROJECT
  BUDGET     COMPL   COMPL  COMPL  ASSESS- MEDIA
(THOUSANDS)   STATUS  DATE    DATE   MENT    TYPE
                                                                     DLA-9
    ADEQUACY OF PROJECT
  ENGIN-
  EERING    TIME      COST
AR-971520187 PROJECT: JM 16-84
CONFORMING STORAGE FACILITY
ACCT: O&M
OSB FT CHAFFEE
AZ-971523788 PROJECT: YUM-88-0
CONFORMING STORAGE FACILITY
ACCT: MILCON
OSB YUMA
CA-9715243S2 PROJECT: STO 90-0
CONFORMING STORAGE FACILITY
ACCT: MILCON
DRMO STOCKTON (TRACY)
ME-971522018 PROJECT: BRU-87-C
CONFORMING STORAGE FACILITY
ACCT: O&M
DRMO BRUNSWICK
                                 AR
                                 AZ
CA-971506827 PROJECT: DACA87
GEOHYDROLOGICAL INVESTIGATIONS
ACCT: DERA
US DOD DEFENSE DEPOT TRACY
TRACY                            CA

CA-971523208 PROJECT: ELT-88-0
CONFORMING STORAGE FACILITY
ACCT: MILCON
DRMO EL TORO (MCAS)
                                 CA
                                 CA
                                 ME
      135.0  ESDF    88/02   90/09  MEDIUM   SOLID
                                         WASTE
                                                      759.2  ESDP
                           91/06  MEDIUM   SOLID
                                         WASTE
ADEQUATE  ADEQUATE   ADEQUATE
 DESIGN    TIMING    ESTIMATE
ADEQUATE  ADEQUATE   ADEQUATE
 DESIGN    TIMING    ESTIMATE
        2.0   ESDP    92/06   90/09  HIGH    WATER    ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
    2,674.0   ESDF    89/09   92/06 MEDIUM   SOLID    ADEQUATE  ADEQUATE   ADEQUATE
                                         WASTE     DESIGN    TIMING    ESTIMATE
                                                    1,900.0  ESDP
                                                                           90/09  HIGH
                                                      724.3  ESDF   85/06   91/06   HIGH
                                         SOLID    ADEQUATE  ADEQUATE   ADEQUATE
                                         WASTE     DESIGN    TIMING    ESTIMATE
                                         SOLID    ADEQUATE  ADEQUATE   ADEQUATE
                                         WASTE     DESIGN    TIMING    ESTIMATE

-------
                                 FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                         DEFENSE LOGISTICS AGENCY                DEFENSE LOGISTICS AGENCY
                PROJECT IDENTIFICATION
                     REQ    EST   PROJECT
  BUDGET     COMPL   COMPL  COMPL ASSESS- MEDIA
(THOUSANDS)  STATUS  DATE   DATE  MENT    TYPE
                                                                                                                     DLA-10
                            ADEQUACY OF PROJECT
                          ENGIN-
                          EERING    TIME      COST
ME-971522019 PROJECT: POR-S9-C
CONFORMING FACILITY
ACCT: MILCON
DRMO PORTSMOUTH
                                 ME
MI-971500500 PROJECT: LEJ-91-M
CONFORMING STORAGE FACILITY
ACCT: MILCON
DRMS - BATTLE CREEK
BATTLE CREEK                     MI

MI-971500500 PROJECT: VERITESTNG
VERIFICATION TESTING PROGRAM RCRA STORAGE FAC.
ACCT: 0*M
DRMS - BATTLE CREEK
BATTLE CREEK                     MI

MI-971500500 PROJECT: 00500PERMT
PART B PERMIT DEVELOPMENT
ACCT: O&M
DRMS - BATTLE CREEK
BATTLE CREEK                     MI

MI-971500500 PROJECT: 00500TRANG
PROVIDE ENVIRONMENTAL TRAINING
ACCT: 04M
DRMS - BATTLE CREEK
BATTLE CREEK                     MI

MI-971500500 PROJECT: 00500EA
ENVIRONMENTAL ASSESSMENT PREPARATION
ACCT: 04M
DRMS - BATTLE CREEK
BATTLE CREEK                     MI
    1,660.0  ESDF   89/03  92/01   HIGH    SOLID     ADEQUATE  ADEQUATE   ADEQUATE
                                          WASTE      DESIGN    TIMING    ESTIMATE
      750.0  ESDP
90/10  HIGH    SOLID    ADEQUATE  ADEQUATE    ADEQUATE
               WASTE     DESIGN    TIMING    ESTIMATE
    1,500.0  ESDP   89/10  90/09  HIGH     SOLID      NOT       NOT        NOT
                                          WASTE     AVAIL     AVAIL      AVAIL
    1,000.0  PSDF   92/11   90/09 MEDIUM   SOLID    ADEQUATE  ADEQUATE   ADEQUATE
                                         WASTE     DESIGN    TIMING    ESTIMATE
    1,000.0  OTHR
90/09 MEDIUM   SOLID
               WASTE
      500.0  OTHR   92/10   90/09 MEDIUM   SOLID
                                         WASTE
ADEQUATE  ADEQUATE   ADEQUATE
 DESIGN    TIMING    ESTIMATE
                        ADEQUATE  ADEQUATE   ADEQUATE
                         DESIGN    TIMING    ESTIMATE

-------
                                 FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR  1991

                         DEFENSE LOGISTICS AGENCY                DEFENSE LOGISTICS AGENCY
                PROJECT IDENTIFICATION
                     REQ    EST    PROJECT
  BUDGET     COMPL   COMPL   COMPL  ASSESS- MEDIA
(THOUSANDS)   STATUS   DATE    DATE   MENT    TYPE
                                                                     DLA-11
    ADEQUACY OF PROJECT
  ENGIN-
  EERING    TIME      COST
MI-971500500 PROJECT: WM-1
WASTE MIN-LITHIUM BATT. ADD-ON DISCHARGE DEV.
ACCT: FUNDING ACCOUNT UNKNOWN
DRMS - BATTLE CREEK
BATTLE CREEK                     MI

MI-971500500 PROJECT: 00500PCBST
PCB COMPLIANT STORAGE
ACCT: FUNDING ACCOUNT UNKNOWN
DRMS - BATTLE CREEK
BATTLE CREEK                     MI

MI-971524760 PROJECT: SAW-87-C
CONFORMING STORAGE FACILITY
ACCT: MILCON
DRMO SAWYER AFB
                                 MI

MN-971586261 PROJECT: DUL-87-C
CONFORMING STORAGE FACILITY
ACCT: MILCON
DRMO DULUTH
DULUTH                           MN

MO-971520979 PROJECT: LED-87-C
CONFORMING STORAGE FACILITY
ACCT: MILCON
DRMO FT.  LEONARD WOOD
                                 MO

OH-971524357 PROJECT: HPMI 2-1-B
CHLOROFLOUROCARBON SUBSTITUTE EVALUATION
ACCT: O&M
DEFENSE ELECTRONIC SUPPLY CTR
DAYTON                           OH
                                                      250.0  OTHR
      500.0  OTHR
      407.0   ESDF
      208.2   ESDF
      208.2   ESDF
                                                                           90/09  MEDIUM
                                         SOLID
                                         WASTE
  NOT
 AVAIL
 NOT
AVAIL
                           90/09 MEDIUM   TOXIC    ADEQUATE  ADEQUATE
                                       SUBSTANCE   DESIGN    TIMING
                           91/12 MEDIUM
                                         SOLID
                                         WASTE
                           91/05 MEDIUM   SOLID
                                         WASTE
                           91/05  HIGH    SOLID
                                         WASTE
      500.0   ESDF    96/09   91/12 MEDIUM    AIR
ADEQUATE  OVERDUE
 DESIGN    TIMING
ADEQUATE  ADEQUATE
 DESIGN    TIMING
ADEQUATE  ADEQUATE
 DESIGN    TIMING
                                                    NOT
                                                   AVAIL
            NOT
           AVAIL
 NOT
AVAIL
                     ADEQUATE
                     ESTIMATE
            HIGH
          ESTIMATE
            HIGH
          ESTIMATE
          ADEQUATE
          ESTIMATE
            NOT
           AVAIL

-------
                                 FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR  1991

                         DEFENSE LOGISTICS AGENCY                DEFENSE LOGISTICS AGENCY
                PROJECT IDENTIFICATION
                                    REQ    EST   PROJECT
                 BUDGET     COMPL   COMPL  COMPL ASSESS- MEDIA
               (THOUSANDS)  STATUS  DATE   DATE  MENT    TYPE
                                                                                    DLA-12
                            ADEQUACY OF PROJECT
                          ENGIN-
                          EERING    TIME      COST
SC-971524432 PROJECT: CHS 85-20
CONDUCT UNDERGROUND CLEANUP.
ACCT: REVOLVING FUND
DEF FUEL SUPPORT PT CHARLESTON
HANAHAN                          SC
UT-971520922 PROJECT: DDOU-7
DDOU REMEDIAL ACTIONS
ACCT: DERA
DEFENSE DEPOT OGDEN
OGDEN
                     710.0  ESDF   91/09  90/09  HIGH    SOLID    ADEQUATE   ADEQUATE   ADEQUATE
                                                         WASTE     DESIGN    TIMING    ESTIMATE
UT-971520922 PROJECT: DDOU-6
GASOLINE CLEAN-UP
ACCT: OftM
DEFENSE DEPOT OGDEN
OGDEN
UT
                                 UT
UT-971549855 PROJECT: OGD-880
HAZARDOUS MATERIAL STORAGE FACILITY
ACCT: MILCON
DEFENSE DEPOT OSDEN UTAH
OGDEN                            UT

VA-971520139 PROJECT: HMIS-88-3
HAZD MATERIAL TECHNICAL CENTER
ACCT: DERA
HQ DEFENSE LOGISTICS AGENCY
ALEXANDRIA                       VA

VA-971520751 PROJECT: HPMI 2-1-A
HAZ WASTE MIN - SPEC REVIEW AND REVISION
ACCT: FUNDING ACCOUNT UNKNOWN
DEFNS GEN SUPPLY CNTR,RICHMOND
RICHMOND                         VA
                   1,000.0  ESDF
90/09 MEDIUM   CERCLA   ADEQUATE  ADEQUATE    ADEQUATE
                         DESIGN    TIMING    ESTIMATE
                       3.0  ESDP   86/08  90/09  HIGH    SOLID     ADEQUATE  ADEQUATE   ADEQUATE
                                                         WASTE      DESIGN    TIMING    ESTIMATE
                     866.2  ESDF
                   2,700.0  OTHR
                     500.0  OTHR
91/06  HIGH    SOLID    ADEQUATE   ADEQUATE   ADEQUATE
               WASTE     DESIGN    TIMING    ESTIMATE
90/09  HIGH    CERCLA   ADEQUATE   ADEQUATE   ADEQUATE
                         DESIGN    TIMING    ESTIMATE
                                          90/09 MEDIUM  MULTI     ADEQUATE  ADEQUATE   ADEQUATE
                                                       MEDIA      DESIGN    TIMING    ESTIMATE

-------
                                  FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                         DEFENSE  LOGISTICS AGENCY                DEFENSE LOGISTICS AGENCY
                 PROJECT  IDENTIFICATION
                     REQ    EST   PROJECT
  BUDGET     COMPL   COMPL  COMPL ASSESS- MEDIA
(THOUSANDS)   STATUS  DATE    DATE   MENT    TYPE
                                                                     DLA-13
             ADEQUACY OF PROJECT
           ENGIN-
           EERING    TIME      COST
VA-971520751  PROJECT: DGSC-71-4
REMEDIAL  CLEAN-UP FIRE TRAINING AREA
ACCT: O&M
DEFNS GEN SUPPLY CNTR,RICHMOND
RICHMOND                         VA

VA-971551595  PROJECT: DGSC-88-7
CLEANUP OF GASOLINE AT PX SERVICE STATION
ACCT: FUNDING ACCOUNT UNKNOWN
DEFNS GEN SUPPLY CNTR
RICHMOND                         VA

VA-971551595 PROJECT: DGSC-88-1
REMEDIAL CLEAN-UP AREA 50/OSA/NGA
ACCT: FUNDING ACCOUNT UNKNOWN
DEFNS GEN SUPPLY CNTR
RICHMOND                         VA
                                                      300.0  ESDF
      150.0   ESDF
      750.0   ESDF
                           90/09  HIGH    CERCLA   ADEQUATE  OVERDUE    ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
                           90/09  MEDIUM  DRINKING    NOT       NOT
                                         HATER     AVAIL     AVAIL
                                NOT
                               AVAIL
                           90/09  HIGH    SOLID    ADEQUATE  ADEQUATE   ADEQUATE
                                         WASTE     DESIGN    TIMING    ESTIMATE
VA-971551595 PROJECT: DGSC-88-2
REMEDIAL CLEAN-UP ACID NEUTRALIZATION PIT
ACCT: DERA
DEFNS GEN SUPPLY CNTR
RICHMOND                         VA

VA-971551595 PROJECT: DGSC-88-6
INSTALL LEAK DETECTION SYSTEMS
ACCT: REVOLVING FUND
DEFNS GEN SUPPLY CNTR
RICHMOND                         VA

VA-971561463 PROJECT: NOR 91-C
CONFORMING STORAGE FACILITY
ACCT: MILCON
DRMO-NORFOLK AMMO DEPOT
PORTSMOUTH                       VA
                                                      200.0  ESDF
                           90/09  MEDIUM   SOLID    ADEQUATE  ADEQUATE   ADEQUATE
                                         WASTE     DESIGN    TIMING    ESTIMATE
      250.0   PSDF    93/10   90/09  HIGH
    3,000.0   ESDF
                          91/03  HIGH
                                         SOLID    ADEQUATE  ADEQUATE   ADEQUATE
                                         WASTE     DESIGN    TIMING    ESTIMATE
SOLID    ADEQUATE  ADEQUATE   ADEQUATE
WASTE     DESIGN    TIMING    ESTIMATE

-------
                                 FEDERAL AGENCY POLLUTION ABATEMENT PLAN FOR FISCAL YEAR 1991

                         DEFENSE LOGISTICS AGENCY                DEFENSE LOGISTICS AGENCY
                PROJECT IDENTIFICATION
                     REQ    EST   PROJECT
  BUDGET     COMPL   COMPL  COMPL ASSESS- MEDIA
(THOUSANDS)  STATUS  DATE   DATE  MENT    TYPE
                                                                     DLA-14
                                                 ADEQUACY OF PROJECT
                                               ENGIN-
                                               EERING    TIME      COST
WA-971523361 PROJECT: WHI-91-0
CONFORMING STORAGE FACILITY
ACCT: MILCON
OSB WHIDBEY (NAS)
535.0  ESDP   87/09  91/03  HIGH
                                          SOLID
                                          WASTE
ADEQUATE  ADEQUATE   ADEQUATE
 DESIGN    TIMING    ESTIMATE
WA-971524352 PROJECT: MUK 87-20
IRP:  REMEDIAL INVESTIGATION/FIELD STUDY
ACCT: REVOLVING FUND
DEF FUEL SUPT PT MUKILTEO
MUKILTEO                         HA

WY-971524179 PROJECT: FEW-90-0
CONFORMING STORAGE FACILITY
ACCT: MILCON
OSB FE WARREN(AFB)
                                 WY

*     TOTAL, DEFENSE LOGISTICS AGENCY
      TOTAL, DEFENSE LOGISTICS AGENCY
      300.0  ESDF   90/09  90/09 MEDIUM    SOLID
                                          WASTE
450.0  ESDF   87/12  91/03  HIGH    SOLID
                                    WASTE
              26,392.1


              26,392.1
                                                                                            33
                                                                                            33
                                             ADEQUATE  ADEQUATE    ADEQUATE
                                              DESIGN    TIMING    ESTIMATE
                                                  ADEQUATE  ADEQUATE   ADEQUATE
                                                   DESIGN    TIMING    ESTIMATE
*******

*
            TOTALS

       BUDGET (IN THOUSANDS)
                                  ********

                             NUMBER OF  PROJECTS               *
      TOTAL, DEPARTMENT OF DEFENSE

      GRAND TOTAL,
             978,798.2

           1,231,522.7
                                    1867

                                    3277

-------
V. PENDING

-------
                                                       IV-1

                 AGENCY RESPONSES PENDING

A key element of the environmental needs planning process
conducted under OMB Circular A-106 is the continuous review of
all Federal agency plans by EPA.  This review serves two very
important functions: first, it gives EPA an opportunity to
evaluate the environmental impact of the projects a Federal
agency proposes to conduct as reported in their A-106 plan;
second, it gives EPA the opportunity to submit specific
recommendations to the various Federal agencies for additions or
changes to their environmental plans.

Each September EPA requests that all Federal agencies update
their environmental plan.  In early January these plans are
reviewed by all EPA environmental media programs throughout the
United States.  These reviews are complete and comprehensive and
usually generate a number of recommendations for new projects for
an agency to consider adding to their plan, as well as
recommendations for changes to existing projects already in an
agencies' plan.

In addition to the recommendations generated as a result of the
January review, EPA also reviews each agency plan quarterly to
ascertain if any new compliance problems have turned up as a
result of EPA inspections, resulting in notices of violation
(NOV's) that would require a new project, or a change in an
existing project, to correct the problem.  Additionally, new
projects may be required as a result of new compliance agreements
signed by the Federal agency since the last update. This "current
compliance check" by EPA helps the Federal agencies to stay on
top of current compliance problems and stay in or return to
compliance with the various environmental statutes or regulations
in a timely manner.

As a result of this continuing dialogue between EPA and the
Federal agencies, at any point in time there will be a group of
recommendations being discussed and pending resolution.  At the
completion of this process a Federal agency has usually responded
in one of several ways: first, they agree with the recommendation
and subsequently add a new project to their environmental plan;
second, they agree with the recommendation and point out to EPA
that the problem is being handled through one or several projects
already in their plan and inform EPA as to which projects are
performing the task; third, the agency may disagree that a new
project is needed in this situation and state the reasons why and
these reasons are either accepted by EPA as valid and no further
action is taken or EPA initiates further dialogue with the
agency.

The attached printout is a listing of those EPA project
recommendations that are still being discussed with the various
Federal agencies and whose resolution is still pending.

-------
                                                           IV-2
                        DESCRIPTION OF CODES
o  The media (environmental law) descriptors used in the
following "quicklook" format are as follows:

      A  -  Air
      W  -  Water
      N  -  Noise
      P  -  Pesticides
      R  -  Radiation
      DW -  Drinking Water
      SW -  Solid Waste (RCRA)
      TS -  TSCA
      OD -  Ocean Dumping
      SF -  CERCLA
o  The pollutant category abbreviation is the identifier of the
category of pollutants to be controlled by a project.  Categories
used in the printout include:

       ASB   -   Asbestos
       CORA  -   Corrective Action
       HAZD  -   Hazardous Pollutants
       POTW  -   Federally Owned Treatment
                 Works-Upgrade/Construction
       MOBL  -   Mobil Air Pollutants
       MSDV  -   Marine Sanitation Device
       SPCC  -   SPCC Plan
       PRET  -   Toxics (Pretreatment)
       RADN  -   Radioactive Pollutants
       UIC   -   Underground Injection Control
       PCB   -   PCB Control
       LUST  -   Leaking Underground Storage Tanks
       NPS   -   Non-Point Source
       GWAT  -   Groundwater Monitoring
       STAT  -   Stationary Source
       DWAT  -   Drinking Water
       PHI thru PH4 - IRP Phase (DOD only)
       BLANK -   Other Pollutants

-------
Page No.
09/01/89
                                    A106 NEW AND  CHANGED  PROJECTS  WITH
                                      FEDERAL AGENCY  RESPONSE  PENDING
 FEDERAL FED FACILITY
 AGENCY   ID NUMBER
**  ARMY
 ARMY    AK-214022157
 ARMY    AZ-213820635
 ARMY    CA-210020436
 ARMY    CA-213820780
ARMY
ARMY
ARMY
ARMY
ARMY
ARMY
ARMY
ARMY
ARMY
ARMY
ARMY
ARMY
ARMY
ARMY
ARMY
ARMY
ARMY
ARMY
ARMY
ARMY
ARMY
ARMY
ARMY
ARMY
ARMY
ARMY
ARMY
ARMY
ARMY
ARMY
ARMY
ARMY
ARMY
ARMY
CA-214020436
CA- 21 4020676
CA-214020677
CO-213820725
CO-213820725
CO-213820769
CO-214020150
CO-214020150
CO-214020150
CO-214020150
CO-214020150
DC-211621156
GA-213720084
GA- 21 3720084
GA- 21 3720368
GA-214020872
GA-214022733
IA-213820445
I A- 21 3820445
IL-213820376
IL-214017805
KS-213720395
KS-213820467
KS-213820878
KS-21 3820878
KS-214020756
KS-214020756
KS-214020756
KS-214020756
KS-214020756
KS-214020756
KY-214020140
MA-210520670
MD-2100
  FACILITY
    NAME
FT RICHARDSON
NAVAJO ARMY DEPOT
FT HUNTER LIGGETT
SACRAMENTO ARMY
DEPOT
LIGGETT FT HUNTER
FT ORD
FT ORD
PUEBLO ARMY DEPOT
PUEBLO ARMY DEPOT
ROCKY MOUNTAIN
ARSENAL
FT CARSON
FT CARSON
FT CARSON
FT CARSON
FT CARSON
WALTER REED HOSPITAL
FT BENNING
FT BENNING
FT GORDON
FT STEWART
HUNTER ARMY AIRFIELD
IOWA AAP (AMC)
IOWA AAP
UAS PRICE SUPPORT
CTR
FT SHERIDAN
TRAINING & DOCTRINE
COM
KANSAS AAP
SUNFLOWER AAP
SUNFLOWER AAP
FT RILEY
1ST INF DIV &  FT
RILEY
1ST INF DIV &  FT
RILEY
1ST INF DIV &  FT
RILEY
US ARMY FORCES
COMMAND
FT RILEY
FORT CAMPBELL
SUDBURY ANNEX
DEFENSE MAPPING
AGENCY
FACILITY
LOCATION
AK
BELLEMONT, AZ
CA
CA
CA
CA
CA
CO
PUEBLO CO
DENVER CO
CO
CO
CO
CO
CO
WASH DC
GA
GA
GA
GA
SAVANNAH GA
IA
BURLINGTON I A
GRANITE CITY,
IL
IL
FORT
LEAVENWORTH KS
PARSONS KS
DESOTO KS
KS
KS
KS
KS
KS
FORT RILEY KS
KS
TN
SUDBURY MA
HYD/TOP 6500
BROOKES LANE
BETHESDA MD
EPA
REGION
10
9
9
9
9
9
9
8
8
8
8
8
8
8
8
3
4
4
4
4
4
7
7
5

5
7

7
7
7
7
7
7
7
7
7
4
1
3


MEDIA f
(
N
SF
SF
SF
N
SF
N
SW
SF
SF
SW
SW
SW
SW
SW

SW
W
W
SF
W
N
SF
N

N
SW

SW
SW
W
N
SW
SW
SW
SW
SW
A
SF
SW


'OLLUTJ
:ATEGOR

HAZD
HAZD
HAZD

HAZD

HAZD
GWAT

LUST
LUST
HAZD
LUST
LUST
LUST
HAZD
HAZD
POTW
HAZD
POTW

HAZD



LUST

HAZD
HAZD
HAZD

LUST
HAZD
LUST
LUST
HAZD
ASB
HAZD
LUST


     EPA       ESTIMATED
RECOMMENDATION  COST $K
   CHANGE
    NEW
    NEW
   CHANGE

   CHANGE
   CHANGE
   CHANGE
   CHANGE
    NEW
    NEW

    NEW
    NEW
   CHANGE
   CHANGE
   CHANGE
    NEW
    NEW
    NEW
    NEW
    NEW
    NEW
   CHANGE
    NEW
   CHANGE

   CHANGE
   CHANGE

    NEW
    NEW
   CHANGE
   CHANGE
   CHANGE

   CHANGE

   CHANGE

   CHANGE

    NEW
    NEW
    NEW
    NEW
 105
1000
   3
 150
                                                                                                      100
                                                                                                        9
                                                                                                      250
                                                                                                      100
                                                                                                    22500

                                                                                                     1000
                                                                                                      500
                                                                                                      120
                                                                                                     2000
                                                                                                      500
                                                                                                       21
                                                                                                      200
                                                                                                       20

                                                                                                       51
                                                                                                      800
                                                                                                       30
                                                                                                      140

                                                                                                      200
                                                                                                      250
                                                                                                      270
                                                                                                      230

                                                                                                      100

                                                                                                      800
                                                                                                        15
                                                                                                      500
                                                                                                        9

-------
Page No.      2
09/01/89
                                   A106 NEW AND CHANGED PROJECTS WITH
                                     FEDERAL AGENCY RESPONSE PENDING
FEDERAL
AGENCY
ARMY

ARMY

ARMY


ARMY

ARMY


ARMY

ARMY

ARMY
ARMY

ARMY
ARMY
ARMY
ARMY
ARMY
ARMY
ARMY
ARMY
ARMY
ARMY
ARMY
ARMY

ARMY
ARMY
ARMY
ARMY
ARMY
ARMY
ARMY
ARMY
ARMY

ARMY

ARMY

ARMY

FED FACILITY
ID NUMBER
MD-2100

MD-2100

MD-2100


MD-2100

MD-2100


MD-214024571

MO-210490037

MO-213720979
MO-213720979

MO-213820489
MO-213820489
MO-213820489
MO-213820489
NE-213820234
NE-213820234
NJ- 21 3734245
NJ-213820597
NJ- 21 3820704
NJ-213820704
NJ-213820704
NM-213820960

NM-213820974
NV-210090006
NY-210094115
NY-213820830
NY-213820830
NY-213820830
NY-213820940
NY-213820940
PA-210020642

PA-210020699

PA- 21 0020892

PA-210090053

FACILITY
NAME
FT MEADE DIR ENG &
HOUSE
US ARMY GARRISON

HARRY DIAMOND LAB


FT RITCHIE

FT RICHIE SITE D


USA FORCECOM
AFZI-EH-E
GOODFELLOW ARMY RES
CTR
FT LEONARD WOOD
UELDON SPRING ORD
WORKS
LAKE CITY AAP
LAKE CITY AAP
LAKE CITY AAP
LAKE CITY AAP
ARMY MATERIEL CMD
CORNHUSKER AAP
FT DIX
FT MONMOUTH
PICATINNY ARSENAL
PICATINNY ARSENAL
PICATINNY ARSENAL
WHITE SANDS MSL
RANGE
FT WINGATE DEPOT
HAWTHORNE AAP
AMSA#9 ARMY RES CTR
SENECA ARMY DEPOT
SENECA ARMY DEPOT
SENECA ARMY DEPOT
WATERVLIET ARSENAL
WATERVLIET ARSENAL
NEW CUMBERLAND ARMY
DEPOT
DEPARTMENT OF THE
ARMY
TOBYHANNA ARMY DEPOT

FT RITCHIE

FACILITY
LOCATION
AFZI-DEH FT
MEADE MD
FT DETRICK
FEDERICK
BLOSSON POINT
RD FIELDTEST
CHARLES MD
ATTN: ASNJ-DEH
FT RITCHIE MD
PENN SHOP RE
NEAR RT 27 JCT
RIDGEVILLE
FT GEORGE MEADE

ST LOUIS MO

MO
MO

MO
MO
INDEPENDENCE MO
MO
GRAND ISLAND NE
NE
NJ
RED BANK NJ
DOVER NJ
DOVER NJ
DOVER NJ
NM

GALLUP NM
NV
MATTYDALE NY
ROMULUS NY
ROMULUS NY
ROMULUS NY
NY
NY
NEW CUMBERLAND
PA
2800 S. 20th ST
PHI LA PA
SDSTO-AF-E.TOBY
HANNA.PA
BLUE RIDGE
SUMMIT PA
EPA
REGION
3

3

3


3

3


3

7

7
7

7
7
7
7
7
7
2
2
2
2
2
6

6
9
2
2
2
2
2
2
3

3

3

3

MEDIA

SW

SW

SW


SW

SW


SU

SW

SW
SW

N
SW
W
SF
SW
SF
A
SW
A
SU
SW
SW

SW
SF
SF
SW
SF
SF
SW
SW
SW

SW

SW

SW

POLLUTANT
CATEGORY
LUST

LUST

LUST


LUST

LUST


LUST

HAZD

LUST
HAZD


CORA
HAZD
HAZD
LUST
HAZD
HAZD
HAZD
ASB
CORA
CORA
PCS

HAZD
HAZD
HAZD
CORA
HAZD
HAZD
CORA
LUST
LUST

LUST

LUST

LUST

EPA
RECOMMENDATION
NEW

NEW

NEW


NEW

NEW


NEW

NEW

CHANGE
CHANGE

CHANGE
CHANGE
NEW
CHANGE
CHANGE
CHANGE
NEW
CHANGE
NEW
CHANGE
CHANGE
CHANGE

NEW
NEW
NEW
NEW
NEW
CHANGE
NEW
CHANGE
NEW

NEW

NEW

NEW

ESTIMATEI
COST $K
465

75

12


33

3


945

50

140
5300




10000
5
1000
155
200
3000
1900
400



1000
100
5
9000
2800
40
215
60

45

30

6


-------
Page No.
09/01/89
                                    A106 NEW AND  CHANGED  PROJECTS WITH
                                      FEDERAL AGENCY  RESPONSE PENDING
 FEDERAL  FED  FACILITY
 AGENCY    ID  NUMBER
ARMY
ARMY
ARMY
ARMY
ARMY
ARMY
ARMY
ARMY
ARMY
ARMY
ARMY
ARMY
ARMY
ARMY
ARMY
ARMY
ARMY
ARMY
ARMY
ARMY
ARMY
ARMY
ARMY
ARMY
ARMV
PA-2118
PA-213820503
PA- 21 3820503
PA-213820503
PA-213820503
PA- 21 3820642
PA-213820892
PA-214042305
PR-21009999
PR-2140RQ327
PR-2140RQ327
TX-213720101
TX-213720101
TX-213820738
TX-214020424
TX-214020429
UT-213820283
VA-2100
VA-2100
VA-2100
VA-2100
VA-2100
VA-2100
VA-2100
VA- 21 0020082
                FACILITY
                  NAME
                       PA  NAT  GUARD  ARMORY

                       LETTERKENNY ARMY
                       DEPOT
                       LETTERKENNY ARMY
                       DEPOT
                       LETTERKENNY ARMY
                       DEPOT
                       LETTERKENNY ARMY
                       DEPOT
                       NEU CUMBERLAND ARMY
                       DEPOT
                       TOBYHANNA ARMY DEPOT
                       FT  INDIANTOWN GAP
                       AMSA #161
                       FT  BUCHANON
                       FT  BUCHANON
                       FT  BLISS
                       FT  BLISS USA  TRADOC
                       RED RIVER ARMY DEPOT
                       FT  HOOD
                       FT  SAM  HOUSTON
                       DUGWAY  PROVING
                       GROUND
                       US  ARMY HO

                       AAFES

                       FT  PICKETT
                       CHEATHEM ANNEX
                       WOODBRIDGE RESEARCH
                       FAC.
                       N FORK  OF POUND LAKE

                       ARLINGTON SERVICE
                       CENTER
                       US  ARMY ENGINEER
                       CENTER
 ARMY    VA-210020416  FT AP HILL
 ARMY
 ARMY
VA-214051290
VI-21189VUAO
FT AP HILL
GOLDEN ROCK ARMORY
FACILITY
LOCATION
RD 1 BOX 103
FRIEDENS PA
CHAMBERSBURG PA
PA
PA
PA
PA
PA
ANNVILLE PA
CATANO PR
FT BUCHANON PR
FT BUCHANON PR
EL PASO TX
TX
TEXARKANA TX
TX
TX
UT
1000 ARL BLVD
ARLINGTON
231 ENTERPRISE
DR NEWPORT NEWS
BLACKSTONE VA
UILLIAMSBURG VA
DAWSON BEACH DR
WOODBRIDGE VA
RT 1 BOX 369
POUND VA
S COURTHOUSE RD
ARLINGTON VA
BLDG 1442
ATZA-DEH-EN FT
BELVOIR
ROUTE 301
BOWLING GREEN
VA
VIRGIN ISLANDS
EPA
REGION
3

3
3
3
3
3
3
3
2
2
2
6
6
6
6
6
8
3

3

3
3
3

3

3

3


3

3
2
MEDIA F
t
SW

sw
su
sw
sw
sw
sw
sw
sw
sw
sw
sw
w
sw
sw
sw
w
sw

sw

sw
sw
sw

sw

sw

sw


sw

N
DW
>OLLUT;
:ATEGOF
LUST

LUST
HAZD
CORA
LUST
HAZD
HAZD
HAZD
LUST
CORA
LUST
LUST
GWAT
HAZD
PCB
HAZD
GWAT
LUST

LUST

LUST
LUST
LUST

LUST

LUST

LUST


LUST


DWAT
                                                                 EPA       ESTIMATED
                                                            RECOMMENDATION  COST  $K
 NEW

 NEW

CHANGE

CHANGE

CHANGE

CHANGE

CHANGE
CHANGE
 NEW
 NEW
 NEW
CHANGE
 NEW
 NEW
 NEW
 NEW
CHANGE

 NEW

 NEW

 NEW
 NEW
 NEW

 NEW

 NEW

 NEW


 NEW

CHANGE
CHANGE
                                                                                               6

                                                                                              51
                                                                                              10
                                                                                             850
                                                                                              60

                                                                                             250
                                                                                            4000
                                                                                             200
                                                                                             300
                                                                                              75

                                                                                              10

                                                                                              15

                                                                                              24
                                                                                              15
                                                                                              39

                                                                                               3

                                                                                               9

                                                                                              87


                                                                                               6

                                                                                              70
**  CIA
 CIA     VA-110312458  CIA HEADQUARTERS
 CIA      VA-5600
                                   LANGLEY VA        3     SW     LUST        NEW
              COMPOUND
              CIA HDQTS. COMPOUND  LANGLEY VA        3     SW     LUST        NEW
                                                                                25

                                                                                33

-------
Page No. 4
09/01/89
A106 NEW AND CHANGED PROJECTS WITH
FEDERAL AGENCY RESPONSE PENDING
FEDERAL
AGENCY
CIA

** COE
COE

COE
COE

COE


** DOC
DOC


DOC

DOC

DOC

DOC

DOC

DOC

DOC

DOC

DOC


DOC
** DOD
DOD

DOD
DOD
DOD
DOD
DOD
FED FACILITY
ID NUMBER
VA-5600


IA-960090005

KS-570090020
NE-211890011

VA-9600



DC-1300


MD-1300

MD-13U

PA-131415471

PA-690500000

PA-690500000

VA-1314

WV-1314

UV-1314

WV-131414766


XX-1314

CA-971524382

KS-971520570
MD-971520567
MO-971520979
MO-971524549
NM-971524422
FACILITY
NAME
PHASE I LIMITED
PARTN.

US ARMY CORPS OF ENG
ODRM
FORMER FORBES AFB
FORMER NEB ORDNANCE
PLANT
US ARMY CORPS OF
ENGR


DEPARTMENT OF
COMMERCE

NBS RT 270 AND
QUINCE
NOAA/NESDIS

NATL WEATHER SERVICE

NATL WEATHER SERV
OFF
NATL WEATHER SERV
OFF
NOAA NATL WEATHER
SERV
NOAA/ NWS

NOAA/NUS

NWS


VARIOUS NOAA FF

DEFENSE DEPOT TRACY
C DLA
DLA
DRMO FORT MEADE
FT LEONARD WOOD
WHITEMAN AFB DLA
DRMO HOLLOMAN AFB
FACILITY
LOCATION
RESTON VA


PLEASANT VALLY
IA
TOPEKA KS
MEAD NE

FT NORFOLK 803
FRONT ST
NORFOLK VA

15th &
CONSTITUTION
AVE
ORCHARD RD
GAITHERSBURG MD
5200 AUTH RD
CAMP SPRINGS MD
192 SHAFER
CORAPOLIS
WILLIAMSPORT-LY
COMING AP
ERIE INT'L
AIRPORT
RD 1 BOX 105
STERLING VA
AIRPORT CIRCLE
BEAVER WV
BOX 271 ELKINS
WV
1475 AIRPORT
ROAD HUNTINGTON
WV
AR/LA/NM/OK/TX

CA

ATCHISON KS
MD
MO

CLOVIS NM
EPA MEDIA POLLUTANT
REGION CATEGORY
3 SW LUST


7 SF HAZD

7 W HAZD
7 DW DWAT

3 SU LUST



3 SW LUST


3 SW LUST

3 SW LUST

3 SW LUST

3 SW LUST

3 SW LUST

3 SW LUST

3 SW LUST

3 SW LUST

3 SW LUST


6 SW LUST

9 SF HAZD

7 SW LUST
3 SW HAZD
7 SW CORA
7
6 SW HAZD
EPA
RECOMMENDATION
NEW


NEW

NEW
NEW

NEW



NEW


NEW

NEW

NEW

NEW

NEW

NEW

NEW

NEW

NEW


NEW

NEW

CHANGE
CHANGE
CHANGE
CHANGE
NEW
ESTIMATE
COST $K
3


20

100
4000

3



6


15

3

3

3

3

6

3

3

3




2000

100



8800
                      DLA
DOD     PA-971520503  DLA DRMO
                      CHAMBERSBURG
PA
                        SW
                               HAZD
                                          CHANGE

-------
Page No.
09/01/89
                                   A106 NEW AND CHANGED PROJECTS WITH
                                      FEDERAL AGENCY  RESPONSE PENDING
FEDERAL
AGENCY
DOD

DOO
DOD

DOD
DOO
DOD
DOD
DOO

DOD

DOD

DOD
** DOE
DOE

DOE
DOE
DOE
DOE

DOE
DOE
DOE
DOE

DOE

DOE

DOE

DOE

DOE

DOE

DOE
DOE
FED FACILITY
ID NUMBER
PA-971522104

PA-971522104
PA-971590001

TX-971520101
TX-971 524091
TX-971524185
TX-971 524643
VA-971520751

VA-971551595

VA-971551595

XX -9700

CA- 890608987

CO- 8900
CO- 8900
CO-8905 10526
FL-890011992

I A- 89 1234407
ID-890808968
IL-890108946
KY-891 808982

KY-891SQ8982

KY-891808982

KY-891808982

KY-891808982

KY-891808982

MD-8900

NJ-890911152
NM 890510515
FACILITY
NAME
DLA DRMO
MECHANICSBURG
DLA DEF PERS SPT CTR
DLA DRMO
PHILADELPHIA
DRMO FT BLISS DLA
REESE AFB DLA
BERGSTROM AFB DLA
DYESS AFB DLA
DEFENSE GENERAL
SUPPLY CT
DEFENSE GENERAL
SUPPLY CT
DEFENSE GENERAL
SUPPLY CT
VARIOUS DOD FF

LAWRENCE LIVERMORE
NAT LAB
ROCKY FLATS PLANTS
ANVIL POINTS
ROCKY FLATS PLANT
DOE PINELLAS

WESTERN AREA POWER
IDAHO NATL ENGR LAB
ARGONNE NATL LABS
PADUCAH GASEOUS
DIFFUSION
PADUCAH GASEOUS
DIFFUSION
PADUCAH GASEOUS
DIFFUSION
PADUCAH GASEOUS
DIFFUSION
PADUCAH GASEOUS
DIFFUSION
PADUCAH GASEOUS
DIFFUSION
US DOE

PRINCETON PLASMA LAB
LOS ALAMOS NATIONAL
FACILITY
LOCATION
PA

PHI LA PA
PA

TX
TX
TX
TX
RICHMOND VA

RICHMOND VA

RICHMOND VA

AR/LA/NM/OK/TX

CA

GOLDEN CO
NEAR RIFLE CO
ROCKY FLATS CO
PINELLAS COUNTY
FL
SIOUX CITY IA
SCOVILLE ID
ARGONNE IL
KY

ICY

KY

KY

KY

KY

RT 118
GERMANTOWN MO
PRINCETON NJ
NM
EPA
REGION
3

3
3

6
6
6
6
3

3

3

6

9

8
8
8
4

7
10
5
4

4

4

4

4

4

3

2
6
MEDIA F
(
SW

SW
SW

SW
SW
SW
SW
u

SW

SW

SW

SF

w
M
SW
SF

SW
SW
W
M

SF

W

SF

SW

W

SW

SF
W
>OLLUTA
;ATEGOR
HAZD

HAZD
HAZD

HAZD
HAZD
HAZD
HAZD
GWAT

CORA

HAZD

LUST

HAZD

HAZD
MULT
CORA
HAZD


HAZD
POTW
MULT

HAZD

GWAT

GWAT

PCB

GWAT

LUST

HAZD
HAZD
 DOE

 DOE
NM-8905

MM-890510515
LAB
WASTE ISOLATION
PILOT PLA
LOS ALAMOS NATIONAL
LAB
                                            CARLSBAD NM
NM
                                                                                        EPA        ESTIMATED
                                                                                   RECOMMENDATION   COST $K
                                                                                     CHANGE

                                                                                     CHANGE
                                                                                     CHANGE
                        SW
                               GWAT

                               HAZD
 NEW
 NEW
 NEW
 NEW
CHANGE

CHANGE

CHANGE

 NEW


 NEW

 NEW
 NEW
CHANGE
 NEW

CHANGE
 NEW
 NEW
 NEW

 NEW

CHANGE

CHANGE

CHANGE

CHANGE

  NEW

  NEW
  NEW

  NEW

  NEW
                                                                                                     675
                                                                                                     450
                                                                                                     300
                                                                                                     215
                                                                                                     7300

                                                                                                      200
                                                                                                      100
                                                                                                    17000
                                                                                                       20
                                                                                                     2100
                                                                                                     6090
                                                                                                       16
                                                                                                       24

                                                                                                      150
17800

-------
Page No. 6
09/01/89
A106 NEW AND CHANGED PROJECTS WITH
FEDERAL AGENCY RESPONSE PENDING
FEDERAL
AGENCY
DOE
DOE
DOE
DOE
DOE
DOE

DOE

DOE
DOE

DOE

DOE

DOE

DOE

DOE

DOE

DOE

DOE

DOE
DOE

DOE

DOE



DOE
** DOI
DOI
DOI
FED FACILITY
ID NUMBER
NM-890510515
NH-890510518
NY -8909089 75
NY -890908975
NY -890908975
OH-89000892

OH -890008973

OH-890508984
OH-891803983

OH-891808976

OH-891808976

OH-891808976

OH-891808976

OH-891808983

OH-891808983

OH-891808983

PA-891 108949

TX-890510527
UT-8900

UV-890031886

WV-890131886



XX-8900

CO-1400
CO-141500001
FACILITY
NAME
SAND I A NATIONAL LAB
SANDIA NATIONAL LAB
BROOKHAVEN NATL LAB
BROOKHAVEN NATL LAB
BROOKHAVEN NATL LAB
FEED MATERIAL PROD
CTR
US DOE FEED
MATERIALS PRO
MOUND
PORTSMOUTH GASEOUS
DIF
FEED MATERIALS PROD
CTR
FEED MATERIALS PROD
CTR
FEED MATERIALS PROD
CTR
FEED MATL PRODUCTION
CENT
PORTSMOUTH GASEOUS
PLT
PORTSMOUTH URANIUM
CMPLEX
PORTSMOUTH EASON DIF
PLT
BETTIS ATOMIC POWER
LAB
PANTEX PLANT
MONTICELLO VICINITY
PROP
MORGANTOWN ENERGY
TECH CO
METC



VARIOUS DOE FF

LEADVILLE TUNNEL
ROBIN BRICKYARD
FACILITY
LOCATION
ALBUQUERQUE NM
ALBUQUERQUE NM
UPTON NY
UPTON NY
UPTON NY
FERNALD OH

OH

MIAMISBURG OH
OH

FERNALD OH

FERNALD OH

FERNALD OH

OH

PIKETON OH

PIKETON OH

PIKETON OH

WEST MIFFLIN PA

AMARILLO TX
MONTICELLO UT

MORGANTOWN WV

PO BX 880
COLLINS FERRY
RD MORGANTOWN
WV
AR/LA/NM/OK/TX

LEADVILLE CO
DENVER
EPA
REGION
6
6
2
2
2
5

5

5
5

5

5

5

5

5

5

5

3

6
8

3

3



6

8
8
MEDIA

SW
SW
SF
SF
SF
SW

SF

M
SW

SW

SW

W

W

SW

M

SW

SW

W
SF

SW

SW



SW

W
SF
POLLUTANT
CATEGORY
HAZD
HAZD
HAZD
HAZD
HAZD
CORA

HAZD

MULT
HAZD

HAZD

CORA

POTW

WWAT

PCB

MULT

HAZD

HAZD

GWAT
HAZD

CORA

LUST



LUST

POTW
HAZD
EPA
RECOMMENDATION
NEW
NEW
NEW
NEW
CHANGE
NEW

CHANGE

NEW
CHANGE

NEW

NEW

NEW

CHANGE

NEW

NEW

NEW

CHANGE

NEW
NEW

CHANGE

NEW



NEW

NEW
CHANGE
ESTIMATI
COST $l
13300

6000
20000
140
3500



800










3000

5000






3000



12





5000
8000
                      DENVER               RADIUM/ROBCO,
                                           CO
DOI     DC-1400       US NAT'L ARBORETUM   3501  NEW YORK
                                           AVE NE
DOI     FL-141732022  GULF ISLAND NATL     FT PICKENS
                      SEASHORE             SANTA ROSA IS
SW
       LUST
       POTW
NEW

NEW

-------
Page No. 7
09/01/89
A106 NEW AND CHANGED PROJECTS WITH
FEDERAL AGENCY RESPONSE PENDING
FEDERAL
AGENCY
DOI

DOI

DOI

DOI

DOI

DOI

DOI

DOI

DOI


DOI

DOI

DOI

DOI

DOI

DOI

DOI

DOI

DOI

DOI


DOI


DOI


DOI

FED FACILITY
ID NUMBER
IL-143509487

HD-1400

NJ-143513904

NJ-143513904

NPID-IL000479

NY-141790018

PA-1417

PA-141719999

VA-1400


VA-1400

VA-1400

VA-1400

VA-1400

VA-1400

VA-1400

VA-1400

VA-1400

VA-1400

VA-141720521


WV- 1435091 54


WV- 143509235


WV- 1435 12508

FACILITY
NAME
CRAB ORCHARD NATL.
WILDLF
BLACKWATER NATL
WILDLIFE
GRT SWMP NATL WILD
REFUGE
GRT SWMP NATL WILD
REFUGE
US BUREAU OF FISH &
WILDL
GATEWAY NATL REC
AREA NPS
DELAWARE WATER GAP
NRA
DELAWARE WATER GAP
NRA
US FISH & WILDLIFE
SERV

OLD DEERFIELD WORK
CENTER
CHINCOTEAGUE NATL
WLDLFE
USDA FOREST SERVICE

SIMMONS GAP
MAINTENANCE
FLENWOOD RANGER
DISTRICT
CLINCH RANGER
DISTRICT
NEW CASTLE RANGER
DISTRCT
WYTHE RANGER DISTRCT

BIG MEADOWS
DEVELOPED ARE
CHANCELLOR FIRE
HOUSE

FISH & WILDLIFE
SERVICE

NATL FISHERIES CTR
LEETWN

BOWDEN NATL FISH
HATCHERY
FACILITY
LOCATION
IL

RT1 BOX121
CAMBRIDGE MD
BASKING RIDGE
NJ
BASKING RIDGE
NJ
CARTERVILLE IL

BROOKLYN NY

LOCH LOMMOND
DINGMN FERRY
GULPH STA RTE
209 BUSHKILL
P 0 BOX
6286,4005
SANDPIPER RD
ST RT 600
STAUNTON VA
P 0 BOX 62
CHINCOTEAGUE VA
RT 2 BOX 30 HOT
SPRINGS VA
RT 4 BOX 292
LURAY VA
PO BOX 8
NATURAL BRIDGE
RT 3 BOX 820
WISE VA
BOX 246 NEW
CASTLE VA
1625 W LEE HWY
WYTHEVILLE VA
RT 4 BOX 292
LURAY VA
P.O. BOX
679.FREDERICKSB
URG VA
400 E MAIN ST
WHITE SULPHUR
SPRINGS WV
BOX 700
KEARNEYSVILLE
WV
RT 1 BOX 80
ELKINS WV
EPA
REGION
5

3

2

2

5

2

3

3

3


3

3

3

3

3

3

3

3

3

3


3


3


3

MEDIA

SF

SW

SF

W



SF

SW

SW

SW


SW

SW

SW

SW

SW

SW

SW

SW

SW

SW


SW


SW


SW

POLLUTANT
CATEGORY
HAZD

LUST

HAZD

GWAT

HAZD

HAZD

LUST

LUST

LUST


LUST

LUST

LUST

LUST

LUST

LUST

LUST

LUST

LUST

LUST


LUST


LUST


LUST

EPA
RECOMMENDATION
CHANGE

NEW

NEW

NEW

NEW

NEW

NEW

NEW

NEW


NEW

NEW

NEW

NEW

NEW

NEW

NEW

NEW

NEW

NEW


NEW


NEW


NEW

ESTIMATE
COST $K


6

500

350



100

3

15

6


6

3

3

3

6

6

6

6

3

3


6


15


3


-------
Page No.      8
09/01/89
                                   A106 NEW AND CHANGED PROJECTS WITH
                                     FEDERAL AGENCY RESPONSE PENDING
FEDERAL
AGENCY
DOI

DOI
** DOJ
DOJ
DOJ

DOJ
DOJ


DOJ

DOJ


DOJ
** DOL
DOL


DOL

DOL
** EPA
EPA
EPA

EPA
** FCC
FCC


FCC

** GSA
GSA

GSA

GSA

GSA

FED FACILITY
ID NUMBER
WY- 0028967

XX-1400

KS-4151909120
PA-151909121

VA-1519
WV-151405994


WV-151916200

WV-151916200


XX-1500

MD-1400


PA- 161634237

XX- 1600

MD-680099005
OH -680030929

OH-680034276

MD-1400


VA-0000


DC-4700

DC-4700

DC-4700

DC-4700

FACILITY
NAME
ST STEPHENS INDIAN
SC BIA
VARIOUS DOI FF

US PENITENTIARY BOP
US PENITENTARY

FBI ACADEMY
FEDL BUREAU OF
PRISONS

FCT MORGANTOWN

BUREAU OF PRISONS


VARIOUS DOJ FF

DEPT OF LABOR
CHEASAPEAKE

PITTSBURGH JOB CORPS
CTR
VARIOUS DOL FF

EPA LAB AT BARC
EPA AWB
ENVIRONMENTAL RES
EPA T AND E FACILITY

FCC


FED COMMUNICATIONS
COMM

GENERAL SERVICES
ADMIN
GENERAL SERVICES
ADMIN
GENERAL SERVICES
ADMIN
GENERAL SERVICES
ADMIN
FACILITY
LOCATION
WIND RIVER
RESERVATION WY
AR/LA/NM/OK/TX

LEAVENWORTH KS
RD. 5 LEWISBURG
PA
QUANT I CO VA
FCI ALDERSON
BOX B ALDERSON
WV
P 0 BOX 1000
MORGANTOWN WV
P 0 BOX 1000
GREENBAG RD
MORGANTOWN WV
AR/LA/NM/OK/TX

JOB CORPS
CENTER PORT
DEPOSIT
HIGHLAND DR
PITTSBURGH
AR/LA/NM/OK/TX

BELTSVILLE MD
OH

OH

7435 OAKLAND
MILLS RD
COLUMBIA MD
2302 W MERCURY
BLVD HAMPTON

2201 C ST NW
WASH DC
7th & D STS SW
WASH DC
2nd & "M" STS
SE WASH DC
1111
CONSTITUTION
EPA
REGION
8

6

7
3

3
3


3

3


6

3


3

6

3
5

5

3


3


3

3

3

3

MEDIA

W

SW

SF
SW

SW
SW


SW

SW


SW

SW


SW

SW

SW
SW

SW

SW


SW


SW

SW

SW

SW

POLLUTANT
CATEGORY
HAZD

LUST

HAZD
LUST

LUST
LUST


LUST

LUST


LUST

LUST


LUST

LUST

HAZD
LUST

LUST

LUST


LUST


LUST

LUST

LUST

LUST

EPA
RECOMMENDATION
NEW

NEW

NEW
NEW

NEW
NEW


NEW

NEW


NEW

NEW


NEW

NEW

CHANGE
CHANGE

CHANGE

NEW


NEW


NEW

NEW

NEW

NEW

ESTIMATEI
COST $K
200



30
15

15
18


9

6




105


12








9


3


9

3

3

6


-------
Page No.
09/01/89
                                   A106 NEW AND CHANGED PROJECTS WITH
                                     FEDERAL AGENCY RESPONSE PENDING
FEDERAL
AGENCY
GSA


GSA


GSA


GSA

GSA

GSA


GSA
GSA

GSA


GSA

GSA


GSA

GSA

GSA


GSA

GSA

GSA

GSA

GSA


GSA

GSA

FED FACILITY
ID NUMBER
DC-4700


HD-4700


MD-4700


MD-4700

HD-4700

MO -4700


PR-470060167
VA-4700

VA-4700


VA-4700

VA-4700


VA-4700

VA-4700

VA-4700


VA-4700

VA-470000009

VI -470000004

WV-4700

WV-470000002


WV-470000023

UV- 470000026

FACILITY
NAME
GENERAL SERVICES
ADMIN

AA MAIN BLDG


SUITLAND FEDERAL
COMPLEX

ALTMEYE BLDG

GEN SVCS ADMIN

GSA/FPRS CURTIS BAY
DEPOT

POST OFFICE
BLDG A GSA STORES
DEPOT
ARLINGTON NATL
CEMETERY

GSA-COURTHOUSE

GENERAL SERVICES
ADMIN

GSA FLEET MGT CTR

US CUSTOMHOUSE

HAMPTON NATL
CEMETERY

FEDERAL BLDG

GENERAL SERVICES
ADMIN
FEDERAL BUILDING

GENERAL SERVICES
ADMIN
GENERAL SERVICES
ADMIN

GSA BLDG

GENERAL SERVICES
ADMIN
FACILITY
LOCATION
1000
INDEPENDENCE
AVE SU
2800 EASTERN
AVE MIDDLE
RIVER MD
SUITLAND AND
SILVERHILL RDS
SUITLAND MD
6401 SECURITY
BLVD WOOD LAWN
SUITLAND GARAGE
& ANNEX
RT. 710
ORDNANCE RD
CURTIS BAY MD
SAN JUAN PR
LOISDALE RD
FRANCONIA VA
BLDG. 107
WAREHOUSE
ARLINGTON VA
10TH & MAIN STS
RICHMOND VA
12201 SUNRISE
VALLEY DR
RESTON VA
1500 U BROAD ST
RICHMOND VA
101 E MAIN ST
NORFOLK VA
CEMETERY RD &
MARSHALL AVE
HAMPTON VA
2301 PARK AVE.
LYNCHBURG VA
PENTAGON
ARLINGTON VA
CHAROTTE AMALIE
VI
BERKELEY
MARTINSBURG WV
NEVILLE ST &
WOOD LAWN
BECKLEY UV
MAPLE & KING
STS MARTINSBURG
7TH & LAFAYETTE
ST MOUNDSVILLE
EPA
REGION
3


3


3


3

3

3


2
3

3


3

3


3

3

3


3

3

2

3

3


3

3

MEDIA

SW


SW


SU


SU

SU

SU


SU
SW

SU


SU

SU


SU

SU

SU


SU

SU

SU

SU

SU


SU

SU

POLLUTANT
CATEGORY
LUST


LUST


LUST


LUST

LUST

LUST


LUST
LUST

LUST


LUST

LUST


LUST

LUST

LUST


LUST

LUST

LUST

LUST

LUST


LUST

LUST

EPA
RECOMMENDATION
NEU


NEW


NEW


NEW

NEW

NEW


NEU
NEU

NEU


NEU

NEU


NEU

NEU

NEU


NEW

NEW

NEU

NEU

NEU


NEU

NEU

ESTIMATE!
COST $K
18


6


3


6

3

9


20
3

9


6

21


12

3

3


3

18

5

3

3


3

3


-------
 Page No.     10
 09/01/89
                                    A106 NEW AND CHANGED PROJECTS WITH
                                      FEDERAL AGENCY RESPONSE PENDING
 FEDERAL  FED  FACILITY    FACILITY
 AGENCY   ID  NUMBER        NAME
 GSA     WV-470000030  GENERAL SERVICES
                       ADMIN
 GSA

 GSA

 GSA

 GSA

 GSA
WV-470000047  GENERAL SERVICES
              ADMIN
WV-470000052  GENERAL SERVICES
              ADMIN
WV-470000057  GENERAL SERVICES
              ADMIN
WV-470000500  FPRS DEPOT
XX-4700
                       VARIOUS GSA FF
**  HHS
 HHS     IL-860006073  FHA HOUS AUTH OF
                       GALLATIN
 HHS     MD-7500       NATL INST OF HEAL

 HHS     MD-7500       FEDERAL BLDG

 HHS     MD-7504       6401 SECURITY BL\
                       SSA
 HHS     MD-750804095  NIH BETHESDA
 HHS     MD-8600       DHHS FORT DETRICK
 HHS     MD-8600       NIH ANIMAL CTR

 HHS     XX-7500       VARIOUS HHS FF
**  NASA
 NASA    MD-8000
 NASA    MD-800013865
 NASA    MD-800013865
 NASA    MD-800013865
 NASA    NM-800019434
 NASA    OH-800005035
 NASA    TX-800016125
 NASA    VA-8000
 NASA    VA-800005033


 NASA    VA-800010763

 NASA    VA-800010763
              GODDARD SP FLT CTR
              GODDARD SP FLT CTR
              GODDARD SP FLT CTR
              GODDARD SP FLT CTR
              WHITE SANDS TEST FAC
              LEWIS RESEARCH CTR
              JOHNSON SPACE CTR
              NASA WALLOPS FLIGHT
              FAC

              NATL AERONAUTICS &
              SPACE

              WALLOPS FLIGHT
              FACILITY
              NASA-WALLOPS FLIGHT
              FAC
 NASA    VA-80005033   LANGLEY RESEARCH CTR
FACILITY
LOCATION
425 JULIANA
STREET
PARKERSBURG WV
CHAPLINE & 12TH
STS WHEELING WV
500 QUARRIER ST
CHARLESTON WV
RT 39 & WATER
ST SUMMERSVILLE
2601 MADISON
AVE PT PLEASANT
AR/LA/NM/OK/TX
OMAHA IL
9000 ROCKVILLE
PK BETHESDA MD
7550 WISCONSIN
AVE BETHESDA
WOOD LAWN MD
BETHESDA MD
FREDERICK MD
ELMER SCHOOL RD
POOLESVILLE MD
AR/LA/NM/OK/TX
GREENBELT MD
GREENBELT MD
GREENBELT MD
GREENBELT MD
NM
OH
HOUSTON TX
BLDG F-160 CODE
205.2 WALLOPS
ISLAND
LANGLEY
RESEARCH
CNTR, HAMPTON VA
WALLOPS ISLAND
VA
CODE 205.2 BLDG
F-160 WALLOPS
ISLAND VA
HAMPTON VA
EPA
REGION
3


3

3

3

3

6
5
3

3

3
3
3
3

6
3
3
3
3
6
5
6
3


3


3

3


3
MEDIA f
(
SW


SW

SW

SW

SW

SW
w
SW

SW

SW
SW
SW
SW

SW
SW
SW
SW
SW
w
N
SW
SW


SW


SW

SW


SW
>OLLUT;
:ATEGOF
LUST


LUST

LUST

LUST

LUST

LUST
POTW
LUST

LUST

LUST
HAZD
LUST
LUST

LUST
LUST
LUST
PCB
HAZD
GWAT

HAZD
LUST


LUST


LUST

LUST


LUST
                                                                               EPA       ESTIMATED
                                                                CATEGORY  RECOMMENDATION  COST $K
                                                                                       NEW
 NEW

 NEW

 NEW

 NEW

 NEW


 NEW

 NEW

 NEW

 NEW

CHANGE
 NEW
 NEW

 NEW
 NEW
CHANGE
CHANGE
CHANGE
CHANGE
CHANGE
 NEW
 NEW
 NEW
 NEW
                                                                                        NEW
                                                                                        NEW
  3

  3

  3

 12
                                                                                              90

                                                                                               3

                                                                                               3
                                                                                              12
                                                                                              72
                                                                                              39
250
500
100
 15
 30


 15

  9

-------
Page No.    11
09/01/89
                                   A106 NEW AND CHANGED PROJECTS WITH
                                     FEDERAL AGENCY RESPONSE PENDING
FEDERAL
AGENCY
NASA
** NAVY
NAVY
NAVY
NAVY
NAVY
NAVY

NAVY
NAVY
NAVY

NAVY

NAVY
NAVY
NAVY
NAVY

NAVY
NAVY
NAVY

NAVY
NAVY

NAVY

NAVY

NAVY

NAVY
NAVY
NAVY
NAVY

NAVY
NAVY
NAVY
NAVY

NAVY
NAVY


NAVY

FED FACILITY
ID NUMBER
XX -8000

CA- 170023208
CA- 170023533
CA- 170024261
CA- 170024261
CA- 170024775

CA- 1700900 16
CT- 170006349
DC- 1700

DC- 1700

DC -1700
DC -170023454
DC- 170023476
DC- 170024311

DC-170024311
FL- 170022474
FL- 170022634

FL-170022952
FL- 170023788

FL- 170023788

FL- 170023788

FL- 170023792

FL- 170024412
FL-170024412
FL-170024733
FL- 170024733

FL-170024736
GA- 170023694
GA- 170023694
GA- 170023694

GU-171527316
MD-1700


MD-1700

FACILITY
NAME
VARIOUS NASA FF

MCAS EL TORO
CAMP PENDLETON
HCLB BARSTOW
MCLB BARSTOW
MARE ISLAND NAVAL
SHIPYAR
NORTH ISLAND NAS
SUBASE NEW LONDON
US NAVAL DISTRICT
WASH
NAVAL DISTRICT OF
WASH
MARINE BARRACKS
US NAVAL OBSERVATORY
US NAVAL SEC STN
US NAVAL RES LAB

NAVAL RES LAB
NAS CECIL FIELD
NAVY FUEL SUPPLY
DEPOT
NAS KEY WEST
MAYPORT NAVAL
STATION
NAVAL STATION
MAYPORT
NAVAL STATION
MAYPORT
NAVAL COASTAL SYSTEM
CTR
NAS JACKSONVILLE
NAS JACKSONVILLE
US NAS
BOCA CHICA SEWAGE
PLT
NAVAL TRAINING CTR
USMC LOGISTICS BASE
USMC LOGISTICS BASE
MARINE CORPS
LOGISTICS BA
DRMO GUAM DLA
PATUXENT RIVER VOR


NAVMEDCOMH NAT
CAPITAL RE
FACILITY
LOCATION
AR/LA/NM/OK/TX

SANTA ANA CA
CA
CA
CA
VALLEJO CA

SAN DIEGO CA
GROTON CT
WASH DC

WASH DC

8th & I STS SE
34 ST MASS AVE
3801 NEB AVE NW
4555 OVERLOOK
AVE SW
WASH DC
JACKSONVILLE FL
JACKSONVILLE FL

FL
FL

FL

FL

PANAMA CITY FL

FL
FL
KEY WEST FL
KEY WEST FL

ORLANDO FL
ALBANY GA
ALBANY GA
GA

GUAM
NAVAL AIR TEST
CENTER
HERMANVILLE
8901 WISCONSIN
AVE BETH MD
EPA
REGION
6

9
9
9
9
9

9
1
3

3

3
3
3
3

3
4
4

4
4

4

4

4

4
4
4
4

4
4
4
4

9
3


3

MEDIA (
(
SW

SF
SF
SF
SF
SF

W
SF
SW

SW

SW
SW
SW
SW

SW
W
W

SF
W

W

SF

SF

W
SW
W
W

SF
W
W
SF

SF
SW


SW

>OLLUT/
:ATEGOF
LUST

HAZD
HAZD
HAZD
HAZD
HAZD

GWAT
HAZD
LUST

LUST

LUST
LUST
LUST
LUST

HAZD
POTW
POTW

HAZD
POTW

HAZD

HAZD

HAZD

HAZD
PCS
POTW
POTW

HAZD
HAZD
HAZD


HAZD
LUST


LUST

                                                                                       EPA       ESTIMATED
                                                                        CATEGORY  RECOMMENDATION  COST $K
                                                                                      NEW
                                                                                      NEW
                                                                                     CHANGE
                                                                                     CHANGE
                                                                                     CHANGE
                                                                                      NEW

                                                                                      NEW
                                                                                      NEW
                                                                                      NEW

                                                                                      NEW

                                                                                      NEW
                                                                                      NEW
                                                                                      NEW
                                                                                      NEW

                                                                                     CHANGE
                                                                                      NEW
                                                                                      NEW

                                                                                      NEW
                                                                                      NEW

                                                                                      NEW

                                                                                      NEW

                                                                                      NEW

                                                                                      NEW
                                                                                     CHANGE
                                                                                      NEW
                                                                                      NEW

                                                                                      NEW
                                                                                      NEW
                                                                                      NEW
                                                                                     CHANGE

                                                                                      NEW
                                                                                      NEW
                                                                                       NEW
250
150
150
250
500
 33

123

  6
  6
 12
 24
 20
  20

  20
  20
  60
1400
 100

1000
   3

-------
Page No.
09/01/89
            12
                                   A106 NEW AND CHANGED PROJECTS WITH
                                     FEDERAL AGENCY RESPONSE PENDING
FEDERAL
AGENCY
NAVY

NAVY

NAVY


NAVY

NAVY


NAVY


NAVY

NAVY


NAVY


NAVY

NAVY

NAVY

NAVY


NAVY

NAVY


NAVY

NAVY

NAVY
NAVY

NAVY


NAVY

FED FACILITY
ID NUMBER
MD - 1 700

MD-1700

MD-1700


MD-1700

MD-1700


MD-1700


MD-1700

MD-1700


MD-1700


MD-1700

MD-1700

MD-1700

MD-1700


MD-1700

MD-1700


MD-1700

MD-1700

MD-1700
MD-1700

MD- 170024 109


MD- 1700241 09

FACILITY
NAME
NAVAL AIR FACILITY

NRL CHES DET

CO NAVELECSYSCOM


NRL LAUREL BRANCH
DRIVE
NAVSURFWPNCEN WHITE
OAK

DTNSRDC CARDEROCK
LAB

HARRY DIAMOND LABS

USNA


DTNSRDC ANNAPOLIS
LAB

NAVAL MED COMM NATL
CAP
NAS/NATC PATUXENT
RIVER
NAVAL COMMUNICATIONS
UNIT
USNA


NAS/NATC PATUXENT
RIVER
CHIEF NAVAL TECH
TRNG

OFFICER IN CHARGE

USNA

NRL HARRY DIAMOND
NAVAL RESEARCH LAB 4

NAVAL ORDNANCE
STATION

NAVAL ORDNANCE
STATION
FACILITY
LOCATION
ATTN: CODE 70
CAMP SPRING MD
5811 BAYSIDE RD
CHESAPEAKE MD
ENGINEERING
ACTIVITY ST
INIGOES MD
WALDORF MD

10901 NEW
HAMPSHIRE AVE
SILVERSPR MD
DAVID TAYLOR
NAVSHIP R & D
CTR BETH
2800 POWER MILL
RD ADELPHI MD
DAIRY FARM RT
175 GAMBRILLS
MD
DAVID TAYLOR
NAVSHIP R&D CTR
ANNAPOLIS
8901 WISCONSIN
AVE BETHESDA
PATUXENT RIVER
MD
REDMAN AVE
CHELTENHAM AVE
U. S. NAVAL STA
KINKAID RD
ANNAPOLIS
SOLOMONS MD

DET BASE
CLOSURE FORCE
PORT DEPOSIT
NAVRADTRANFAC
ANNAPOLIS
PUBLIC WORKS
DEPT ANNAPOLIS
LA PLATA
ST RT 225/BUMPY
OAK RD POMONKEY
PUBLIC WORKS
DEPT INDIAN
HEAD MD
INDIAN HEAD VA

EPA MEDIA POLLUTANT EPA
REGION CATEGORY RECOMMENDATION
3 SW LUST NEW

3 SW LUST NEW

3 SW LUST NEW


3 SW LUST NEW

3 SW LUST NEW


3 SU LUST NEW


3 SW LUST NEW

3 SW LUST NEW


3 SW LUST NEW


3 SU LUST NEW

3 SW LUST NEW

3 SW LUST NEW

3 SW LUST NEW


3 SW LUST NEW

3 SW LUST NEW


3 SW LUST NEW

3 SU LUST NEW

3 SW LUST NEW
3 SW LUST NEU

3 SW LUST NEW


3

ESTIMATE
COST $K
12

60

12


6

21


81


27

3


18


66

252

24

21


87

21


66

24

3
6

45


50


-------
Page No. 13
09/01/89
A106 NEW AND CHANGED PROJECTS WITH
FEDERAL AGENCY RESPONSE PENDING
FEDERAL
AGENCY
NAVY
NAVY

NAVY
NAVY
NAVY
NAVY
NAVY
NAVY
NAVY
NAVY
NAVY
NAVY

NAVY

NAVY

NAVY
NAVY

NAVY

NAVY

NAVY
NAVY
NAVY
NAVY
NAVY

NAVY
NAVY

NAVY

NAVY
NAVY

NAVY

NAVY

NAVY

NAVY

NAVY

FED FACILITY
ID NUMBER
MD- 170024 109
HD- 170024536

MD- 170024536
MD- 170024687
MN- 17002291 4
MN- 1700229 14
MN- 17002291 4
MS -170022626
NC- 170027261
NH-170022019
NJ- 170022172
NJ-170022695

NY -170023794

PA-170013500

PA-170013500
PA-170022198

PA -170022346

PA -170022366

PA- 170022406
PA- 170022418
PA-170022418
PA- 170022418
PA-170024160

PA- 170024545
PA- 170027246

PA- 170027256

PA- 170035011
PA- 170063 159

PR -170027203

PR -170027203

PR -170027203

PR -170027383

PR -170027383

FACILITY
NAME
NOS INDIAN HEAD
NAVAL AIR
STATION -PAX RVR
NAS PATUXENT RIVER
NAVMEDCOM
NIROP MINNEAPOLIS
NIROP MINNEAPOLIS
NIROP MINNEAPOLIS
CBC GULFPORT
USMC AIR STN
NSY PORTSMOUTH
NAVAL WPNS STN-EARLE
NAVAL AIR PROPUL
CNTR
NAVAL WPNS INDUST
RESERV
USATRADOC CARLISLE
BRKS
CARLISLE BARRACKS
NAVY EXCHANGE

NAVRESCEN ALTOONA

US MARINE CORPS
AFRESCEN
NAVAL RESERVE CENTER
US NAVY BASE
NSY PHI LA
NSY PHI LA
MARCOR RESCEN

NAVAIRDEVCEN
US NAVY AVIATION
SUPPO
US NAVY BASE
HOSPITAL
FT INDIANTOWN GAP
US NAVY BASE DAMAGE

NAVAL STN ROOSEVELT
RDS
NAVAL STN ROOSEVELT
RDS
NAVAL STN ROOSEVELT
RDS
NAVAL SEC GROUP
ACTIVITY
NAVAL SEC GROUP
ACTIVITY
FACILITY
LOCATION
MD
PATUXENT RIVER
MD
MD
BETHESDA MD
MN
MN
MN
MS
CHERRY POINT NC
KITTERY MAINE
COLTS NECK NJ
TRENTON NJ

CALVERTON NY

PA

PA
NAVAL STATION
PHI LA
320 E CHESTNUT
ALTOONA PA
3938 OLD FRENCH
ERIE PA
WILLIAMSPORT PA
BROAD ST PHI LA
PA
PA
KENHURST &
PERSNG READING
WARMINSTER PA
700 ROBBINS AVE
PHI LA
BROAD ST PHI LA

ANNVILLE PA
CONTR TRNG CTR
PHI LA
CIEBA PR

CIEBA PR

CIEBA PR

SABANA SECA PR

SABANA SECA PR

EPA
REGION
3
3

3
3
5
5
5
4
4
1
2
2

2

3

3
3

3

3

3
3
3
3
3

3
3

3

3
3

2

2

2

2

2

MEDIA

SW


SW
SW
SF
SW
SF
SF
SW
SW
SF
SF

SW

SW

SW
SW

SW

SW

SW
SW
SW
SW
SW

SW
SW

SW

SW
SW

SW

w

SW

SF

SF

POLLUTANT
CATEGORY
HAZD


HAZD
HAZD
HAZD
HAZD
CORA

CORA
HAZD
HAZD
HAZD

CORA

LUST

LUST
LUST

LUST

LUST

LUST
LUST
LUST
HAZD
LUST

LUST
LUST

LUST

LUST
LUST

CORA

STAT

LUST

HAZD

HAZD

EPA
RECOMMENDATION
CHANGE


CHANGE
CHANGE
CHANGE
CHANGE
CHANGE
CHANGE
NEW
NEW
CHANGE
CHANGE

NEW

CHANGE

CHANGE
NEW

NEW

NEW

NEW
NEW
CHANGE
CHANGE
NEW

CHANGE
NEW

NEW

CHANGE
NEW

NEW

NEW

NEW

NEW

NEW

ESTIMATED
COST $K

50



200
1500
196
50

1000
7900
3200

750




9

3

6

3
99


3


24

45


18

2300

6000

480

500

1000


-------
Page No.    14
09/01/89
                                   A106 NEW AND CHANGED PROJECTS WITH
                                     FEDERAL AGENCY RESPONSE PENDING
FEDERAL
AGENCY
NAVY

NAVY

NAVY

NAVY
NAVY
NAVY
NAVY
NAVY
NAVY

NAVY

NAVY
NAVY
NAVY
NAVY
NAVY


NAVY

NAVY

NAVY

NAVY

NAVY


NAVY


NAVY

NAVY
NAVY


NAVY

NAVY

NAVY

FED
ID
PR-

PR -

PR-

PR-
PR-
PR-
PR-
RI-
SC-

SC-

TX-
TX-
TX-
TX-
VA-


VA-

VA-

VA-

VA-

VA-


FACILITY
NUMBER
170027383

170033095

170033095

170090002
170099997
170099998
170099999
170022036
170022560

170022620

170022787
170022787
170022787
170024761
1700


1700

1700

1700

1700

1700


VA-1700


VA-

VA-
VA-


VA-

VA-

VA-



1700

1700
1700


1700

1700

1700

FACILITY
NAME
NAVAL SEC GROUP
ACTIVITY
NAVAL COMM STN FT
ALLAN
NAVAL COMM STN FT
ALLAN
NAVAL AMMO FACILITY
NAVAL COMM STN
NAVAL COMM STN
NAVAL COMM STN
CBC DAVISVILLE
CHARLESTON NAVAL
SHIPYARD
NAVAL WEAPONS
STATION
NAS CORPUS CHRIST!
NAS CORPUS CHRISTI
NAS CORPUS CHRISTI
NAS KINGSVILLE
MARINE CORPS EXC
SERV

NAVAL MEDICAL CLINIC

NAVAL SURFACE
WARFARE CTR
NORFOLK NAVAL
SHIPYARD
GOLF COURSE
STORAGE/SHWR
NAVAL STATION
WAREHOUSE

SHORE PATROL


NAVAL AIR REWORK
FACILITY
NAVAL SECURITY GROUP
SUPPLY DEPT DESERT
GROVE

NAVAL WEAPONS
STATION
FLEET COMBAT TRNG
CTR
MARINE CORPS FLYING
CLUB
FACILITY
LOCATION
SABANA SECA PR

PONCE PR

PONCE PR

VIEQUES PR
AGUANA PR
SALINAS PR
ISABELA PR
RI
SC

CHARLESTON SC

TX
TX
TX
TX
BLDG. M-224
CAMP ELMORE
NORFOLK VA
6500 HAMPTON
BLVD NORFOLK
PUBLIC WORKS
DEPT DAHLGREN
BLDG 1500
PORTSMOUTH
BLDG CA-500
NORFOLK VA
BLDG FRP-14
90TH ST
NORFOLK VA
BLDG NOR 140
140 EAST ST
NORFOLK VA
NORFOLK VA

CHESAPEAKE VA
NAVAL
AMPHIBIOUS BASE
LITTLE CREEK
YORKTOWN VA

DAM NECK
VIRGINIA BEACH
PO BOX 275
QUANT I CO VA
EPA
REGION
2

2

2

2
2
2
2
1
4

4

6
6
6
6
3


3

3

3

3

3


3


3

3
3


3

3

3

MEDIA F
t
SW

SF

SW

SW
SW
SW
SW
SF
SF

SF

SW
SW
W
SW
SW


SW

SW

SW

SW

SW


SW


SW

SW
SW


SW

SW

SW

'OLLUT/
:ATEGOf
LUST

HAZD

LUST

CORA
LUST
LUST
LUST
HAZD
HAZD

HAZD

LUST
HAZD
GWAT
HAZD
LUST


LUST

LUST

LUST

LUST

LUST


LUST


LUST

LUST
LUST


LUST

LUST

LUST

                                                                                       EPA       ESTIMATED
                                                                        CATEGORY  RECOMMENDATION  COST $K
                                                                                      NEW

                                                                                      NEW

                                                                                      NEW

                                                                                      NEW
                                                                                      NEW
                                                                                      NEW
                                                                                      NEW
                                                                                      NEW
                                                                                      NEW

                                                                                      NEW

                                                                                      NEW
                                                                                      NEW
                                                                                      NEW
                                                                                      NEW
                                                                                      NEW
                                                                                      NEW

                                                                                      NEW

                                                                                      NEW

                                                                                      NEW

                                                                                      NEW


                                                                                      NEW


                                                                                      NEW

                                                                                      NEW
                                                                                      NEW


                                                                                      NEW

                                                                                      NEW

                                                                                      NEW
  90

 100

  20

3200
  15
  10
  35
 500
  20

  20
 125
 250
  25
   3
   9

  27

   9
  15

  24
  15
  18

  15

   9

-------
Page No.
09/01/89
15
                                   A106 MEW AND CHANGED PROJECTS WITH
                                     FEDERAL AGENCY RESPONSE PENDING
FEDERAL
AGENCY
NAVY

NAVY

NAVY

HAVY

NAVY

KAVY

NAVY
kAVY

HAVY

NAVY

KAVY


KAVY

NAVY

NAVY


NAVY
NAVY

NAVY
NAVY
NAVY


NAVY

NAVY

NAVY
NAVY
NAVY
NAVY
NAVY
NAVY
NAVY
FED FACILITY
ID NUMBER
VA-1700

VA-1700

VA-1700

VA-1700

VA-1700

VA-1700

VA-1700
VA-1700

VA-1700

VA-1700

VA-1700


VA- 170022472

VA- 170022482

VA- 170022482


VA- 1700225 02
VA-170022512

VA- 170022513
VA- 170022513
VA- 170022556


VA- 170022556

VA- 170022556

VA- 170022556
VA- 170022939
VA- 170022939
VA- 170022939
VA-170024132
VA- 170024135
VA-170024170
FACILITY
NAME
BR MEDCLINIC

NAVY EXCHANGE

NAVY- COMMAND ING
OFFICER
US NAV & KARINE
RESERVE
NAV RADIO
TRANSMITTING
NAVMARCORSEN

NAVAL AIR STATION
PORTSMOUTH NAVAL
HOSPITAL
NORFOLK NAVAL
SHIPYARD
SCOTT CENTER

NAVY ARLINGTON BARR


NAVAL SUPPLY CENTER

NAVAMPHIB BASE
SUPPLY DEP
SPECIAL SERV US NAVY


NAVHOSP PORTSMOUTH
NAVSTA SEWELLS PT

NAVY NAS NORVA
NAS NORFOLK
NAVAL AIR STAT.


NAVY COMMANDING OFF.

NAVY FIRE SCHL. TRNG

NAVSTA NORFOLK
FLETRACENLANT
FLECOMBATRACEN LANT
FLTCOMBATRACENLANT
NAVFACENGCOH
KARCORDEVEDUCOMM
NAVAL WPN STA
FACILITY
LOCATION
NAVAL STATION
NORFOLK VA
BLDG CEP-66
NORFOLK VA
BLDG CD-3
NORFOLK VA
NAVAL AHPH BASE
LITTLE CREEK
SLEEPY HOLE RD
DRIVER VA
6000 STRATHHORE
RD RICHMOND VA
NORFOLK VA
PORTSMOUTH VA

BLDG 1341
PORTSMOUTH VA
BLDG 343
PORTSMOUTH VA
NAVY GAS
STATION
ARLINGTON VA
NORFOLK NAVAL
BASE NORFOLK VA
LITTLECREEK VA

NAVAL
AMPHIBIOUS BASE
LITTLE CR.
PORTSMOUTH, VA
NAV BASE BLDG
W-62 NORVA
NORFOLK VA
VA
PUBLIC WORKS
DEPT. VIRGINIA
BEACH VA
7800 HAMPTON
BLVD NORFOLK VA
NAVAL OPERATING
BASE NORFOLK VA
VA
DAM NECK VA
VIRGINIA BEACH
DAM NECK VA
ALEXANDRIA VA
QUANTICO VA
YORKTOWN VA
EPA
REGION
3

3

3

3

3

3

3
3

3

3

3


3

3

3


3
3

3
3
3


3

3

3
3
3
3
3
3
3
MEDIA

SW

SW

sw

SW

sw

sw

sw
sw

sw

sw

sw


sw

sw

sw


sw
sw

sw
sw
sw


sw

sw

sw
SU
sw
sw
N
sw
sw
POLLUTANT
CATEGORY
LUST

LUST

LUST

LUST

LUST

LUST

LUST
LUST

LUST

LUST

LUST


LUST

LUST

LUST


LUST
LUST

LUST
HAZD
LUST


LUST

LUST

HAZD
LUST
LUST
HAZD

LUST
LUST
EPA
RECOMMENDATION
NEW

NEW

NEW

NEW

NEW

NEW

NEW
NEW

NEW

NEW

NEW


NEW

NEW

NEW


CHANGE
NEW

NEW
CHANGE
NEW


NEW

NEW

CHANGE
NEW
NEW
CHANGE
CHANGE
NEW
NEW
ESTIMATED
COST $•<
3

3

3

3

18

6

9
12

3

6

9


3

5

21



15

60

24


3

3


5
18

618
40
5

-------
Page No. 16
09/01/89
A106 NEW AND CHANGED PROJECTS WITH
FEDERAL AGENCY RESPONSE PENDING
FEDERAL
AGENCY
NAVY
NAVY
NAVY

NAVY

NAVY

NAVY

NAVY
NAVY

NAVY
NAVY

NAVY

NAVY

NAVY

NAVY

NAVY
NAVY


NAVY
FED FACILITY
ID NUMBER
VA- 1700241 70
VA- 170024605
VA- 170024606

VA- 170024606

VA- 170024698

VA- 170024722

VA- 170024722
VA- 170024813

VA- 17002481 3
VA-170024818

VA- 170062226

VA- 170063 194

VA- 1700900 17

VI -170099998

VI -170099999
WV- 170022546


UV- 170024805
FACILITY
NAME
WPNSTA YORKTOWN
NAVY CHEATHAM ANNEX
NAS OCEANA

NAVAL AIR
STATION-OCEANA
ARMED FORCES
EXPERIMENTAL
MARINE CORPS DEV &
EDU
MCDEC
NORVA NAVAL SHIPYD

NSY
NORFOLK NAVAL
SHIPYARD
NAS OCEANA

CRANEY ISLAND FUEL
TERMIN
YORKTOWN FUEL
TERMINAL
NAVAL STN CROWN
MOUNTAIN
HAMS BLUFF FACILITY
NAVAL RESERVE CTR


COMMANDING OFF USN
FACILITY
LOCATION
VA
WILLIAMSBURG VA
PUB UKS DEPT VA
BEACH
VIRGINIA BEACH
VA
CAMP PEARY
WILLIAMSBURG VA
QUANT I CO VA

QUANT I CO VA
BLDG 1460
PORTSMOUTH
PORTSMOUTH VA
BLDG. 237
PORTSMOUTH VA
VIRGINIA BEACH
VA
NAVSUPPCEN
PORTSMOUTH
USCG TRNG STA
YORKTOWN
ST CROIX VI

ST CROIX VI
KANAWHA RIVER &
G ST SO
CHARLESTON WV
SUGAR GROVE WV
EPA
REGION
3
3
3

3

3

3

3
3

3
3

3

3

3

2

2
3


3
MEDIA

SW
SW
SW



SW

SW


SW


SW

SW

SW

SW

SW

SW
SW


SW
POLLUTANT
CATEGORY
HAZD
LUST
LUST



LUST

LUST


LUST


LUST

HAZD

LUST

LUST

LUST

LUST
LUST


LUST
EPA
RECOMMENDATION
CHANGE
NEW
NEW



NEW

NEW


NEW


NEW

CHANGE

NEW

NEW

NEW

NEW
NEW


NEW
ESTIMAT
COST $:

10
35

50

24

9

50
20

500
12



155

130

5

5
3


15
                       RRF
**  NRC
 NRC     MO-079900932  WESTLAKE LANDFILL    BRIDGETON MO      7

**  NSA
 NSA     MD-970590004  NSA/OPERATIONS BLDG  9800 SAVAGE RD    3
                       2B                   FT MEADE MD

**  NSF
 NSF     XX-0000       VARIOUS NSF FF       AR/LA/NM/OK/TX    6

**  SBA
 SBA     XX-7300       VARIOUS SBA FF       AR/LA/NM/OK/TX    6

**  SI
 SI      MD-3300       SMITHSONIAN          (SERC) CONTEES    3
                       INSTITUTION          WHARF RD
                                            EDGEWATER
SW     HAZD
SW     LUST
SW     LUST
SW     LUST
SW     LUST
                   NEW
                   NEW
                   NEW
                   NEW
                   NEW
                                  800
                                   18
                                   15

-------
Page No.    17
09/01/89
                                    A106 NEW AND CHANGED PROJECTS UITH
                                      FEDERAL AGENCY RESPONSE ROBINS
FEDERAL FED FACILITY    FACILITY
ASENCY   ID NUMBER        NAME
FACILITY        EPA  MEDIA PCLLUTA.ST
LOCATION      REGION       CATEGORY
                                                                                         EPA
                                                                                                   ES'IHATEO
                                                                                                    COST $,<
SI      W-3300       SMITHSONIAN SILVER    39Oi  C_:  SILVER   3
                      HILL                  HILL  RO
                                            SUITLAJO
SI      HD-3300       SMITHSONIAN           NUSEIW SU?T CTR   3
                      INSTITUTION           4210  SILVERHILL
                                            RC  SUITL
                                                                    sv
                                                                                        SEW
                                                                                                        12
" SSA
SSA

" S'AT
S'ATE
STATE

MD-4700

s
DC-1936
XX-19OO

SOCIAL SECURITY
AOMIN

BRITISH EMBASSY
VARIOUS STATE DPT F=

6-01 SECURITY
SLVD wccontfs

3 ICO MASS AVE
AR/LA/WCX/TX

3


3
6

s*


s.
sv

LUST


LUST
L'JST

SEW


SEW
SEW

3


12

" TREAS
TREAS
TREAS

" USAF
13AF
USAF
USAF

USAF
USAF

USAF

USA?

USAF
USAF
USAF
USAF
USAF

USAF

USAF

USAF

USAF
USAF
USAf


CO-2OOO
DC-200907812


AR- 571 924473
CO-5700
CO- 5700

DC- 5700
DE-5700

DE-5700

DE- 571 8240 10

DE-571 824010
D€-571 824010
DE-571 824010
D€-571824010
D€- 5 72824274

DE-572890001

FL- 570024407

FL-571 824375

KS-571 924140
LA-571 924050
W-5700


US MINT DENVER
BUREAU OF ENGRAVING
i PR I

SAC EAXER AFB
CHEYENNE HTS AFB
PETERSON AFB

AIR FORCE
DANG RES FORCE
TRAINING
DANG RES FORCE
TRAINING
DOVER AFB

DOVER AFB
DOVER AFB
DOVER AFB
DOVER AFB
AFSOU GREATER VI LH
AIRPOR
DELAWARE AIR
NATIONAL GAR
CAPE CANAVERAL AF
STN
HURLBURT FIELD (Af
MAC)
NCCONJELL AFB
BARKSOALE AFB
USAF CAW SPRINGS
SCVR SI

DENVER CO
14th & C STS
WASH DC SV

AR
CO
C0LORADC
SPRINGS CO
1100 CES/DEEV
NEW CASTLE, DE

BLDG. 2821, NEW
CASTLE DE
436 ABG/CC
DOVER DE
DOVER DE
DOVER DE
DOVER DE
DE
151 N DUPONT
NEW CASTLE
BLDG 2818 NEW
CASTLE
CAPE KENNEDY FL

HURLBURT FIELD
FL
WICHITA KS
LA
1776 ABV/DEEV
ANDREWS AFB
CAW SPRINGS
8
3


4
8
8

3
3

3

3

3
3
3
3
3

3

4

4

7
4
3


w
sv


s
ta
SF

sw
sv

sv

sv

sv
sv
sv
SF
sv

sv

w

w

sv
N
sv


PRET
LUST



r.AZ;
•G-WAT

LUST
LUST

LUST

LUST

LUST
LUST
LUST
CERC
LUST

uUST

POTW

HAZD

LUST

LUST


sr»
SE*


CKA.NGE
SEW
SEW

HEW
SEW

NEW

SEW

SEW
SEW
S'EW
CHANGE
NEW

NEW

NEW

NEW

CHANGE
CHASGE
NEW


250
51



2CO
ICC

3
3

3

195

3
3500
1000

3

6





1054

3



-------
Page No.
09/01/89
            18
                                   A106 NEW AND CHANGED PROJECTS WITH
                                     FEDERAL AGENCY RESPONSE PENDING
FEDERAL
AGENCY
USAF

USAF

USAF

USAF
USAF
USAF
USAF
USAF
USAF
USAF
USAF
USAF
USAF
USAF

USAF
USAF
USAF

USAF

USAF
USAF
USAF
USAF
USAF
USAF
USAF
USAF
USAF
USAF
USAF
USAF
USAF
USAF
USAF
USAF
USAF
USAF
USAF
USAF

FED FACILITY
ID NUMBER
HD-5700

MD-5700

MD-5700

MD-571824000
MD-571824000
MD- 69033 1800
MN-5700
MO- 571 224292
MO-571924549
MO-571924549
MO-571924549
ND-571924759
NJ-571824018
NM-213820960

NM-572124454
NV-572124110
NY-570028931

NY-571224273

NY-571924451
NY-571924451
NY-572024641
NY-572024641
OH-571724312
OK-571724391
PA-571225349
PA -5 728
SD- 571 924644
TX-5717224333
TX-571724333
TX-572024303
UT-571724350
UT-571724350
UT-571724350
VA-570024477
VA- 5 72890002
UI -214020563
UI-5700
WV-572890001

FACILITY
NAME
USAF 1776 ABW/DEEV

MD AIR NATIONAL
GUARD
BRANDYWINE MILHSG
ANDREWS
ANDREWS AFB
ANDREWS AFB
USCG YARD
ST PAUL INTL AP AFNG
RICHARDS GEBAUR AFB
WHITEMAN AFB
WHITEMAN AFB
WHITEMAN AFB
GRAND FORKS AFB
MCGUIRE AFB
WHITE SANDS MSL
RANGE
CANNON AFB
NELLIS AFB
YOUNGSTOWN TN ANNEX

914TH TACTICAL AIR
GROUP
GRIFFISS AFB
GRIFFISS AFB
AF PLANT #59
AF PLANT #59
WRIGHT-PATT AFB
TINKER AFB
WILLOW GROVE AFB
PA ANG
ELLSWORTH AFB
KELLY AFB
KELLY AFB
BROOKS AFB
HILL AFB
HILL AFB
HILL AFB
LANGLEY AFB
VA AIR NATL GUARD
FT MCCOY
BILLY MITCHELL FLD
167TH TAG EWVRA

FACILITY
LOCATION
ANDREWS AFB
CAMP SPRINGS MD
2701 EASTERN
BLVD BALTIMORE
1776 ABW/DEEV
CAMPSPRINGS MD
CAMP SPRINGS MD
CAMP SPRINGS MD
BALTIMORE MD
ST PAUL MN
MO
KNOBNOSTER MO
KNOBNOSTtR MO
KNOBNOSTER MO
ND
WRIGHTSTOWN NJ
NM

CLOVIS NM
NV
PORTER CENTER
NY
NIAGRA FALLS
IAP NY
ROME NY
ROME NY
JOHNSON CITY NY
JOHNSON CITY NY
OH
OKLAHOMA CITY
WILLOW GROVE PA
HIAP MIDDLETOWN
SD
SAN ANTONIO TX
SAN ANTONIO TX

UT
UT
UT
HAMPTON VA
SANDSTON VA
WI
MILWAUKEE WI
SHEPHERD FIELD
MARTINSBURG WV
EPA
REGION
3

3

3

3
3
3
5
7
7
7
7
8
2
6

6
9
2

2

2
2
2
2
5
6
3
3
8
6
6
6
8
8
8
3
3
5
5
3

MEDIA

SW

SW

SW

SW
SW
SW
SW
SW
SW
P
u
SF
A
SW

W
SF
SF

A

SF
SF
SF
SF

W
SW
SW
SF
W
TS
SF
W
SF
SF
SW
SW
SW
SW
SW

POLLUTANT
CATEGORY
LUST

LUST

LUST

LUST
HAZD
LUST
LUST
LUST
LUST
GWAT
HAZD
LUST
HAZD
CORA

GWAT
HAZD
HAZD

ASB

HAZD
HAZD
HAZD
HAZD

PRET
HAZD
LUST
HAZD
GWAT
HAZD
PCB
GWAT
HAZD
HAZD
LUST
LUST
HAZD
LUST
LUST

EPA
RECOMMENDATION
NEW

NEW

NEW

CHANGE
CHANGE
CHANGE
NEW
CHANGE
CHANGE
NEW
NEW
CHANGE
CHANGE
CHANGE

NEW
NEW
NEW

NEW

NEW
NEW
NEW
NEW
CHANGE
NEW
CHANGE
NEW
CHANGE
NEW
NEW
CHANGE
CHANGE
CHANGE
CHANGE
NEW
NEW
CHANGE
NEW
NEW

ESTIMATE
COST $t
258

33

3




100
54
117
50


300



1000
100

400

15000
10000
1500
4000
15
500

6
4200
70

250

11000
6000
39
9

100
12

**  USDA
 USDA    DE-120520859  USDA POULTRY RSCH
                       LAB
RD 2 BOX 600      3
GEORGETOWN DE
SW
       LUST
                   NEW

-------
Page No. 19
09/01/89
A106 NEW AND CHANGED PROJECTS WITH
FEDERAL AGENCY RESPONSE PENDING
FEDERAL
AGENCY
USDA
USDA
USDA

USDA

USDA
USDA

USDA

USDA

USDA

USDA

USDA

USDA

USDA

USDA

USDA

USDA

USDA

USDA

USDA
** USPS
USPS

USPS

USPS

USPS

USPS

USPS
USPS

FED FACILITY
ID NUMBER
MD- 120508940
MD- 1205 08940
PA- 120500000

PA- 120500000

PR -120560 182
VI-120560180

WV-1205

WV-120532122

WV-1223

WV-1223

WV-1223

WV-1223

WV-1223

WV-1223

WV-1223

WV-1223

WV-1223

XX- 1200

XX-1200

DE-1800

DE-1800

DE-1800

DE-1800

DE-1800

DE-1800
DE-1800

FACILITY
NAME
AGRI RES CTR
AGRI RES CTR
USDA ARS EASTERN REG
RSCH
USDA ARS EASTERN REG
RSCH
USDA RESEARCH STN
USDA EXPERIMENTAL
STN
ARS-NAA

ARS APPAL FRUIT RES
STAT
FOREST SERVICE

FOREST SERVICE

FOREST SERVICE

FOREST SERVICE

FOREST SERVICE

FOREST SERVICE

FOREST SERVICE

FOREST SERVICE

FOREST SERVICE

VARIOUS FORMER
OWNEDSITES
VARIOUS USDA FF

NEWARK POST OFFICE

US POSTAL SERVICE

US POSTAL SERVICE

US POSTAL SERVICE

US POSTAL SERVICE

US POSTAL SERVICE
NEWARK POST OFFICE

FACILITY
LOCATION
BELTSVILLE MD
BELTSVILLE MD
600 E MERMAID
LN WYNDMOOR
600 EAST MERMD
WYNDMOOR
MAYAGUEZ PR
KINGSHILL VI

AIRPORT ROAD
BEAVER WV
KEARNEYSVILLE
WV
STATE RT 28
PETERSBURG WV
FOREST SERV RD
NEOLA WV
BOX N-1 NEOLA
WV
US RT 250
BARTOW WV
PARSONS NURSERY
PARSONS WV
ST RT 39
MARLINTON WV
YOKUM STREET
ELKINS WV
ST RT 39
RICHWOOD WV
ST RT 28
RIVERTON WV
EPA REGION 7

AR/LA/NM/OK/TX

401 OGLETOWN
NEWARK DE
4901 GOVERNOR
PRINTZ VI LH DE
147 QUIGLEY
BLVD WILM DE
3204 CONCORD
PIKE WILN DE
3434 OLD CAP
TRAIL WILM DE
3204 CONCORD PK
401 OGLETOWN
upuieir HP
EPA
REGION
3
3
3

3

2
2

3

3

3

3

3

3

3

3

3

3

3

7

6

3

3

3

3

3

3
3

MEDIA

SW
SW
SW

SU

SW
SW

SW

SW

SW

SW

SU

SW

SW

SW

SU

SW

SW

SW

SU

SU

SW

SW

SU

SU

SU
SU

POLLUTANT
CATEGORY
LUST
HAZD
LUST

LUST

LUST
LUST

LUST

LUST

LUST

LUST

LUST

LUST

LUST

LUST

LUST

LUST

LUST

HAZD

LUST

LUST

LUST

LUST

LUST

LUST

LUST
LUST

EPA
RECOMMENDATION
NEW
CHANGE
NEU

NEU

NEW
NEW

NEU

NEU

NEU

NEU

NEU

NEU

NEW

NEW

NEU

NEU

NEU

NEU

NEW

NEU

NEU

NEW

NEW

NEW

NEW
NEU

ESTIMATEI
COST $K
42

27

27

25
10

6

12

3

3

6

6

6

3

6

6

6

500000



6

3

18

3

3

3
6


-------
Page No. 20
09/01/89
FEDERAL FED FACILITY
AGENCY
USPS

USPS

USPS


USPS

USPS

USPS

USPS


USPS

USPS

USPS


USPS

USPS

USPS

USPS

USPS

USPS


USPS

USPS


USPS


USPS

USPS

ID NUMBER
DE-1800

FL- 180000098

HD-1800


MD-1800

MD-1800

MD-1800

MD-1800


MD-1800

MD-1800

MD-1800


MD-1800

MD-1800

MD-1800

MD-1800

MD-1800

MD-1800


MD-1800

MD-1800


MD-1800


MD-1800

MD-1800

A106 NEW AND CHANGED PROJECTS WITH
FEDERAL AGENCY RESPONSE PENDING
FACILITY FACILITY EPA MEDIA POLLUTANT EPA ESTIMATE
NAME
US POSTAL SERVICE

JACKSONVILLE BULK
MAIL
SUBURBAN GMF/VMF


US POSTAL SERVICE

US POSTAL SERVICE

US POSTAL SERVICE

US POSTAL SERVICE


US POSTAL SERVICE

US POSTAL SERVICE

US POSTAL SERVICE


US POSTAL SERVICE

US POSTAL SERVICE

US POSTAL SERVICE

US POSTAL SERVICE

US POSTAL SERVICE

US POSTAL SERVICE


US POSTAL SERVICE

US POSTAL SERVICE


ASPEN HILLDG


US POSTAL SERVICE

US POSTAL SERVICE

LOCATION REGION CATEGORY RECOMMENDATION
4901 GOVERNOR
PRINTZ WILM DE
FL

16501 SHADY
GROVE RD
GAITHERSBURG HD
4325 GALLATIN
ST HYATTSVILLE
5 GLYNDON DR
REISTERSTOWN
7001 ARLINGTON
RD BETHESDA
9801 LANTHAM
SEVERN RD
SEABROOK
201 E PATRICK
ST FREDERICK
8051 NEWEL ST
SILVER SPRING
500 N
WASHINGTON ST
ROCKVILLE
115 WIGHT AVE
COCKEYSVILLE MD
SPRING AVE
CHESTERTOWN MD
3000 HOMEWOOD
RD BALTIMORE
503 MARKET ST
DENTON MD
6221 EASTERN
AVE BALTIMORE
11550
LIVINGSTON RD
FT WASHINGTON
900 E. FAYETTE
ST BALTIMORE
5240-44
REISTERSTOWN RD
BALTIMORE
14030
CONNCETICUT AVE
ASPEN HILL MD
6093 CENTRAL
AVE CAPITOL HTS
5616 OXEN HILL
RD OXEN HILL MD
3 SW LUST NEW

4 W POTW NEW

3 SW LUST NEW


3 SW LUST NEW

3 SW LUST NEW

3 SW LUST NEW

3 SW LUST NEW


3 SW LUST NEW

3 SW LUST NEW

3 SW LUST NEW


3 SW LUST NEW

3 SW LUST NEW

3 SW LUST NEW

3 SW LUST NEW

3 SW LUST NEW

3 SW LUST NEW


3 SW LUST NEW

3 SW LUST NEW


3 SW LUST NEW


3 SW LUST NEW

3 SW LUST NEW

COST $K
3



15


15

3

3

12


3

3

3


3

3

6

3

3

3


12

3


3


3

3


-------
Page No.
09/01/89
            21
                                   A106 NEW AND CHANGED PROJECTS WITH
                                     FEDERAL AGENCY RESPONSE PENDING
FEDERAL FED FACILITY
AGENCY ID NUMBER
USPS ND-1800


USPS HD-1800

USPS HD-1800



USPS ND-1800

USPS MD-1800


USPS ND-1800

USPS MD-1800

USPS ND-1800

USPS MD-1800


USPS HD-1800


USPS ND-1800


USPS ND-1800


USPS ND-1800


USPS ND-1800

USPS ND-1800


USPS ND-1800


USPS HD-1800


USPS HD-1800

FACILITY
NAME
US POSTAL SERVICE


US POSTAL SERVICE

US POSTAL SERVICE



US POSTAL SERVICE

US POSTAL SERVICE


US POSTAL SERVICE

US POSTAL SERVICE

US POSTAL SERVICE

US POSTAL SERVICE


US POSTAL SERVICE


US POSTAL SERVICE


US POSTAL SERVICE


US POSTAL SERVICE


US POSTAL SERVICE

US POSTAL SERVICE


US POSTAL SERVICE


US POSTAL SERVICE


US POSTAL SERVICE

FACILITY EPA HEDIA POLLUTANT
LOCATION REGION CATEGORY
14030 3 SW LUST
CONNECTICUT AVE
SILVER SPRING
6500 MARLBORO 3 SW LUST
PK DISTRICT HTS
HD/NPC 3 SW LUST
CUMBERLAND 215
PARK ST
CUMBERLAND
143 ROLLINS AVE 3 SW LUST
ROCICVILLE NO
500 POSTAL 3 SW LUST
SERVICE RD
WALDORF ND
8201 NARFORD RD 3 SW LUST
BALTIMORE
340 S LOUSON 3 SW LUST
AVE BALTIMORE
12S7 EUDOWQCC 3 SW LUST
PLAZA TOWSON
1826 3 SW LUST
PENNSYLVANIA
AVE BALTINORE
NCPBRNCH9591 3 SW LUST
BALTINORE AVE
COLLEGE PARK
NAIN BRANCH 150 3 SW LUST
POST OFFICE RD
WALDORF
9591 BALTINORE 3 SW LUST
AVE COLLEGE
PARK; ND
RN 209 BLDG3 3 SW LUST
BELTSVILLE AGRI
RSCN CTR ND
7496 RITCHIE 3 SW LUST
HWY GLEN BURN IE
13217 NEW 3 SW LUST
HAMPSHIRE AVE
SILVER SPRING
110 UNIVERSITY 3 SW LUST
BLVD SILVER
SPRING ND
3375 ELLICOTT 3 SW LUST
CENTER OR
ELLICOTT CITY
6502 B£LAIR RD 3 SW LUST
BALTIMORE
EPA
RECOMMENDATION
NEW


NEW

NEW



NEW

NEW


NEW

NEW

NEW

NEW


NEW


NEW


NEW


MEW


NEW

NEW


NEw


NEW


NEW

ESTINATEl
COST $X
3


3

6



3

3


6

3

3

3


3


3


3


,2


3

3


3


3


3


-------
Page No.
09/01/89
            22
                                   A106 NEW AND CHANGED PROJECTS WITH
                                     FEDERAL AGENCY RESPONSE PENDING
FEDERAL FED FACILITY FACILITY
AGENCY
USPS

USPS


USPS

USPS


USPS

USPS


USPS

USPS

USPS
USPS

USPS


USPS

USPS

USPS

USPS

USPS

USPS

USPS


USPS


USPS

USPS

USPS

ID NUMBER
MD-1800

MD-1800


MD-1800

MD-1800


MD-1800

MD-1800


MD-1800

MD-1800

MD-1800
MD-1800

MD-1800


MD-1800

MD-1800

MD-1800

MD-1800

MD-1800

MD-1800

MD-1800


MD-1800


MD-1800

MD-1800

MD-1800

NAME
US POSTAL SERVICE

US POSTAL SERVICE


US POSTAL SERVICE

US POSTAL SERVICE


US POSTAL SERVICE

US POSTAL SERVICE


US POSTAL SERVICE

US POSTAL SERVICE

US POSTAL SERVICE
US POSTAL SERVICE

US POSTAL SERVICE


HYAATTSVILLE MAIN
OFFICE
US POSTAL SERVICE

US POSTAL SERVICE

US POSTAL SERVICE

US POSTAL SERVICE

US POSTAL SERVICE

US POSTAL SERVICE


ROSEDALE POST OF ICE


US POSTAL SERVICE

US POSTAL SERVICE

US POSTAL SERVICE

FACILITY
EPA MEDIA POLLUTANT EPA
ESTIMATE!
LOCATION REGION CATEGORY RECOMMENDATION COST $K
4901 HAN FORD RD
BALTIMORE
7400 BUCKHANNON
ST LANDOVER
HILLS
FORT FOOTE RD
OXEN HILL MD
4808 ST
BARNABAS RD
TEMPLE HILLS MD
6101 LIBERTY RD
BALTIMORE MD
5730
COTTONWORTH AVE
BALTIMORE MD
6801 OAK MALL
LN COLUMBIA MD
1001 FREDERICK
RD CATONSVILLE
60 W OLIVER ST
116E DOVER
STREET EASTON
200 WILSON
POINT RD.
BALTIMORE
4325 GALLATIN
ST HYATTSVILLE
7001 ARLINGTON
RD BETHESDA MD
11550
LIVINGSTON RD.
301 HIGH STREET
FORT WASHINGTON
8616 2ND. AVE.
CAMBRIDGE, MD
202 E WATER ST
CENTREVILLE MD
10214 S.
DOLFIELD RD
BALTIMORE
7000 GOLDEN
RING RD
BALTIMORE
6 WAELCH AVE
BALTIMORE
1500 POINTER RD
BOWIE
RT 50 AMD
TRUITT ST
3 SW LUST NEW

3 SW LUST NEW


3 SW LUST NEW

3 SW LUST NEW


3 SW LUST NEW

3 SW LUST NEW


3 SW LUST NEW

3 SW LUST NEW

3 SU LUST NEW
3 SW LUST NEW

3 SW LUST NEW


3 SW LUST NEW

3 SW LUST NEW

3 SW LUST NEW

3 SW LUST NEW

3 SW LUST NEW

3 SW LUST NEW

3 SW LUST NEW


3 SW LUST NEW


3 SW LUST NEW

3 SW LUST NEW

3 SW LUST NEW

3

3


18

3


3

3


12

3

3
3

3


3

3

3

3

3

3

3


3


12

3

3


-------
Page No.
09/01/89
23
                                   A106 NEW AND CHANGED PROJECTS WITH
                                     FEDERAL AGENCY RESPONSE PENDING
FEDERAL FED FACILITY    FACILITY
AGENCY   ID NUMBER        NAME
USPS    PA-1800       US POSTAL SERVICE

USPS    PA-180000000  US POSTAL SERVICE

USPS    PA-180000000  US POSTAL SERVICE

USPS    PA-180000000  US POSTAL SERVICE

USPS    PA-180000000  US POSTAL SERVICE

USPS    PA-180000000  US POSTAL SERVICE

USPS    PA-180000001  US POSTAL SERVICE

USPS    PA-180000097  US POSTAL SERVICE

USPS    PA-180000132  US POSTAL SERVICE

USPS    PA-180000158  US POSTAL SERVICE

USPS    PA-180000158  US POSTAL SERVICE

USPS    PA-180000207  US POSTAL SERVICE

USPS    PA-180000279  US POSTAL SERVICE

USPS    PA-180000279  UPPER ST CLAIR  PO

USPS    PA-180000289  US POSTAL SERVICE

USPS    PA-180000299  US POSTAL SERVICE

USPS    PA-180000310  US POSTAL SERVICE

USPS    PA-180000316  EAST LIBERTY
                      FACILITY
USPS    PA-180000322  US POSTAL SERVICE

USPS    PA-180000324  US POSTAL SERVICE

USPS    PA-180000331  POSTAL  SERVICE

USPS    PA-180000331  US POSTAL SERVICE

USPS    PR-180000007  US POST OF  RIO
                      PIEDRAS
USPS    PR-180000021  US POST OF  PONCE
                      MAIN BRN
FACILITY
LOCATION
2108 EAST 38TH
ERIE
850 WALNUT
ST.McKEESPORT
345 SOUTH MAIN
ST BUTLER
302 EAST 2ND ST
OIL CITY
COMMONWLTH
WARRENDALE PA
850 WALNUT ST
McKEESPORT
517 FRANKLIN
ALLIQUIPPA PA
811 JEFFERSON
LATROBE PA
435 S. CASCADE
NEW CASTLE
370 CASTLE
SHANNON PITTSBG
1001 CALIF AVE
PITTSBURGH
3RD & LIBERTY
STS WARREN
1136 WESTERN
AVE PGH PA
2211 LESNETT RD
PITTSBG
1541 BUTLER
PLANK GLENSHAW
2765 S PARK RD
BETHEL PARK
115 BOYLSTON ST
BRADFORD
6360 BROAD
STREET PGH PA
2108 EAST 38TH
ST ERIE PA
2800 STAFFORD
AVE SCRANTON
1140 THORN RUN
CORAOPOLIS
192 SHAFER RD
CORAPOLIS PA
PR
PR
EPA
REGION
3

3

3

3

3

3

3

3

3

3

3

3

3

3

3

3

3

3

3

3

3

3

2
2
MEDIA

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW
SW
POLLUTANT
CATEGORY
LUST

LUST

LUST

LUST

LUST

LUST

LUST

LUST

LUST

LUST

LUST

LUST

LUST

LUST

LUST

LUST

LUST

LUST

LUST

LUST

LUST

LUST

LUST
LUST
EPA
RECOMMENDATION
NEW

NEW

NEW

NEW

NEW

NEW

NEW

NEW

NEW

NEW

NEW

NEW

NEW

NEW

NEW

NEW

NEW

NEW

NEW

NEW

NEW

NEW

NEW
NEW
ESTIMATEI
COST $K
12

3

3

3

12

3

3

3

12

3

15

3

15

3

3

3

3

12

3

12

3

3

10
15

-------
Page No. 24
09/01/89
A106 NEW AND CHANGED PROJECTS WITH
FEDERAL AGENCY RESPONSE PENDING
FEDERAL
AGENCY
USPS

USPS

USPS

USPS

USPS

USPS

USPS

USPS


USPS

USPS

USPS

USPS

USPS


USPS


USPS
USPS

USPS


USPS

USPS

USPS

USPS

USPS

USPS

FED FACILITY
ID NUMBER
PR -180099999

VA-1800

VA-1800

VA-1800

VA-1800

VA-1800

VA-1800

VA-1800


VA-1800

VA-1800

VA-1800

VA-1800

VA-1800


VA-1800


VA-1800
VA-1800

VA-1800


VA-1800

VA-1800

VA-1800

VA-1800

VA-1800

VA-1800

FACILITY
NAME
US POST OF BAYAMON
BRNCH
US POSTAL SERVICE

LAFAYETTE STATION

NORVIEW STATION

US POSTAL SERVICE

US POSTAL SERVICE

US POSTAL SERVICE

US POSTAL SERVICE


US POSTAL SERVICE

US POSTAL SERVICE

US POSTAL SERVICE

US POSTAL SERVICE

US POSTAL SERVICE


US POSTAL
SERVICE-VMF

FAC ENG DIV BLDG 55
USFS-UARM SPRINGS
RD.
US POSTAL SERVICE


US POSTAL SERVICE

FORT HILL STATION

MELROSE STATION

US POSTAL SERVICE

US POSTAL SERVICE

US POSTAL SERVICE

FACILITY
LOCATION
PR

101 N PINETTA
DR RICHMOND
2658 TIDEWATER
DR NORFOLK
1112 GREEN ST
NORFOLK
SECOND & HIGH
STS COEBURN VA
1021 HI OAKS RD
RICHMOND
2101 HOPKINS RD
RICHMOND
14104 WARWICK
BLVD NEWPORT
NEWS
6200 ROLLING RD
W SPRINGFIELD
1110 SUNSET
HILL RD RESTON
1800 REDDY DR
WOODBRIDGE
150 STERLING
BLVD STERLING
340 N PLEASANT
VALLET RD
WINCHESTER
3300 ODD
FELLOWS RD
LYNCHBURG
YORKTOWN
RT 2 BOX 30 HOT
SPRINGS VA
5327
CHAMBERLAYNE
RICHMOND
6137 LINCOLNIA
RD ALEXANDRIA
6020 FORT AVE
LYNCHBURG VA
301 B MELROSE
AVE NW ROANOKE
700 MAIN ST
DANVILLE VA
6204 LAKESIDE
AVE RICHMOND
414 N. 25TH ST.
RICHMOND
EPA
REGION
2

3

3

3

3

3

3

3


3

3

3

3

3


3


3
3

3


3

3

3

3

3

3

MEDIA

SW

SW

SW

SW

SW

SW

SW

SW


SW

SW

SW

SW

SW


SW


SW
SW

SW


SW

SW

SW

SW

SW

SW

POLLUTANT
CATEGORY
LUST

LUST

LUST

LUST

LUST

LUST

LUST

LUST


LUST

LUST

LUST

LUST

LUST


LUST


LUST
LUST

LUST


LUST

LUST

LUST

LUST

LUST

LUST

EPA
RECOMMENDATION
NEW

NEW

NEW

NEW

NEW

NEW

NEW

NEW


NEW

NEW

NEW

NEW

NEW


NEW


NEW
NEW

NEW


NEW

NEW

NEW

NEW

NEW

NEW

ESTIMATEI
COST $K
5

3

3

3

3

3

3

3


6

3

3

3

6


9


9
3

6


3

3

6

3

3

3


-------
Page No.
09/01/89
25
                                   A106 NEW AND CHANGED PROJECTS WITH
                                     FEDERAL AGENCY RESPONSE PENDING
FEDERAL
AGENCY
USPS

USPS

USPS


USPS

USPS

USPS


USPS


USPS

USPS

USPS

USPS

USPS

USPS


USPS

USPS

USPS

USPS

USPS

USPS

USPS

USPS

USPS

FED FACILITY
ID NUMBER
VA-1800

VA-1800

VA-1800


VA-1800

VA-1800

VA-1800


VA-1800


VA-1800

VA-1800

VA-1800

VA-1800

VA-1800

VA-1800


VA- 180000054

WV-1800

WV-1800

WV-1800

WV-1800

WV-1800

WV- 180000006

WV- 180000009

WV-180000012

FACILITY
NAME
US POSTAL SERVICE

US POSTAL SERVICE

CHESAPEAKE MAIN PO


RIVERMONT STATION

SOUTH NORFOLK
STATION
US POSTAL SERVICE


DENBIGH POST OFFICE


US POSTAL SERVICE

COMPUTERIZED
FORWARDING
US POSTAL SERVICE

US POSTAL SERVICE

VEHICLE MAINTENANCE
FAC
VEHICLE MAINTENANCE
FAC

LAFAYETTE STATION

US POSTAL SERVICE

US POSTAL SERVICE

US POSTAL SERVICE

US POSTAL SERVICE

US POSTAL SERVICE

US POSTAL SERVICE

US POSTAL SERVICE

US POSTAL SERVICE

FACILITY
LOCATION
3517 FLOYD AVE
RICHMOND
519 N. MAIN ST
FRANKLIN
1425
BATTLEFIELD
BLVD CHESAPEAKE
2485 RIVERMONT
AVE LYNCHBURG
1210 POINDEXTER
ST CHESAPEAKE
1155 SEMINOLE
TRAIL
CHARLOTTESVILLE
14104 WARWICK
BLVD NEWPORT
NEWS
8409 LEE HWY
MERRIFIELD
129 N WITCHDUCK
RD VA BEACH
534 W MAIN ST
APPALACHIA
1430 N AUGUSTA
ST STAUNTON
2300 DUKE ST
ALEXANDRIA
2503
SHIRLINGTON RD
ARLINGTON
2658 TIDEWATER
DR NORFOLK
311 21ST ST
NITRO WV
310 W LEE ST
CHARLESTON
331 MADISON ST
FAIRMONT WV
311 21 ST ST
NITRO WV
301 N ST
BLUEFIELD WV
602 DONNELLY ST
CHARLESTON
500 W PIKE ST
CLARKSBURG WV
200 FAIRMONT
AVE FAIRMONT WV
EPA
REGION
3

3

3


3

3

3


3


3

3

3

3

3

3


3

3

3

3

3

3

3

3

3

MEDIA

SW

SW

SW


SW

SW

SW


SW


SW

SW

SW

SW

SW

SW


SW

SW

SW

SW

SW

SW

SW

SW

SW

POLLUTANT
CATEGORY
LUST

LUST

LUST


LUST

LUST

LUST


LUST


LUST

LUST

LUST

LUST

LUST

LUST


LUST

LUST

LUST

LUST

LUST

LUST

LUST

LUST

LUST

EPA
RECOMMENDATION
NEW

NEW

NEW


NEW

NEW

NEW


NEW


NEW

NEW

NEW

NEW

NEW

NEW


NEW

NEW

NEW

NEW

NEW

NEW

NEW

NEW

NEW

ESTIMATE
COST $*
3

3

3


3

3

21


6


18

3

3

3

12

3


3

3

3

3

3

3

12

3

3


-------
Page No.
09/01/89
            26
                                   A106 NEU AND CHANGED PROJECTS WITH
                                     FEDERAL AGENCY RESPONSE PENDING
FEDERAL FED FACILITY    FACILITY
AGENCY   ID NUMBER        NAME
FACILITY        EPA  MEDIA POLLUTANT      EPA       ESTIMATED
LOCATION      REGION       CATEGORY  RECOMMENDATION  COST $K
USPS    UV-180000066  VEH MAINT FAC & GMF  1000 VA AVE U     3     SU     LUST        NEU
                      FAC                  HUNTINGTON UV
USPS    UV-180000069  US POSTAL SERVICE    220 N KANAUHA     3     SW     LUST        NEU
                                           ST BECKLEY UV
USPS    XX-1800       VARIOUS USPS FF      AR/LA/NM/OK/TX    6     SU     LUST        NEU
                                                         12

                                                          3
   VA
VA
VA
DC-210021160
DE-3600
SOLDIERS AND AIRMENS 21 HAREUOCO RD
CEME
VETERANS 1601 KIRKUOOD
ADMINISTRATION
VA

VA

VA
VA
VA
VA
VA
VA
VA
VA
VA
VA

VA
VA

VA
VA

VA

VA
MD-3600

MD-3600

MD-3600
NJ-360010375
NJ-360010385
NY -360007274
NY-360007280
NY-360010236
NY-360010236
NY-360010307
NY-360010396
PA-360007281

PA-360007293
VA-360010235

VA-360010293
VA- 3600584 14

UV-360007276

UV-360010255
VA

VA

VA
VA
VA
VA
VA
VA
VA
VA
VA
VA

VA
VA

VA
VA

MEDICAL

MEDICAL

MEDICAL
MEDICAL
MEDICAL
MEDICAL
MEDICAL
MEDICAL
MEDICAL
MEDICAL
MEDICAL
MEDICAL

MEDICAL
MEDICAL

MEDICAL
MEDICAL

CENTER

CENTER

CENTER
CENTER
CENTER
CENTER
CENTER
CENTER
CENTER
CENTER
CENTER
CENTER

CENTER
CENTER


CENTER

VAMC BECKLEY



LOUIS A JOHNSON VA
HUY UILM DE
3900 LOCH RAVEN
BLVD BALTIMORE
PERRY POINT UAY
PERRY POINT
FORT HOUARD MD
EAST ORANGE NJ
LYONS NJ
BATAVIA NY
BUFFALO NY
ALBANY NY
ALBANY NY
MONTROSE NY
SYRACUSE NY
NEU CASTLE RD
BUTLER PA
LEBANON PA
1201 ROCK BLVD
RICHMOND
HAMPTON VA
1970 ROANOKE
BLVD SALEM VA
200 VETERANS
AVE BECKLEY UV
CLARKSBURG UV
3
3

3

3

3
2
2
2
2
2
2
2
2
3

3
3

3
3

3

3
SW
SU

SU

SU

SU
A
A
A
A
A
A
SU
A
SU

SU
SU

SU
SU

SU

SU
LUST
LUST

LUST

LUST

LUST
STAT
ASB
STAT
HAZD
ASB
HAZD
HAZD
HAZD
LUST

HAZD
LUST

LUST
LUST

LUST

LUST
NEU
NEU

NEU

NEU

NEU
NEU
NEU
NEU
CHANGE
NEU
CHANGE
CHANGE
CHANGE
NEU

CHANGE
NEU

NEU
NEU

NEU

NEU
3
3

12

36

6
1000
5000
750
1450
60
700
1400
220
27


45

12
27

9

15
MEDCEN
VA


VA

VA
UV-360010284


UV-36007301

XX-3600
VA


MEDICAL


CENTER


VAMC MARTINSBURG


VARIOUS VA

FF
1540 SPRING
VALLEY DRIVE
HUNTINGTON UV
CHARLES TOUN RD
MARTINSBURG WV
AR/LA/NM/OK/TX
3


3

6
SU


SU

SU
LUST


LUST

LUST
NEU


NEU

NEU
15


15



-------