PB97-9d3821
                                 EPA/541/R-97/192
                                 January 1998
EPA  Superfund
       Record of Decision:
       Vega Alta Public Supply Wells, OU 2
       Vega Alta, PR
        9/30/1997

-------
               DECLARATION FOR THE RECORD OF DECISION



SITE NAME AND LOCATION

Vega Alta Public Supply Wells, Vega Alta, Puerto Rico

STATEMENT OF BASIS AND PURPOSE

This Record of Decision (ROD) documents the U.S. Environmental Protection Agency's
(EPA's) selection of a source control remedy for the Vega Alta Public Supply Weils Site
(the Site) in accordance with the requirements of the Comprehensive Environmental
Response, Compensation and Liability Act of 1980, as amended (CERCLA), 42 U.S.C.
§9601 et seq., and to the extent practicable, the National Oil and Hazardous
Substances Pollution Contingency Plan (NCP), 40 CFR Part 300. An administrative
record for the Site,  established pursuant to the NCP, 40 CFR 300.800, contains the
documents that form the basis for EPA's selection of the remedial action (see Appendix
The Puerto Rico Environmental Quality Board (EQB) has been consulted on the
proposed remedial action in accordance with CERCLA §121(f), 42 U.S.C. §9621 (f), and
it concurs with the selected remedy (see Appendix C).
ASSESSMENT OF THE SITE

Actual or threatened releases of hazardous substances from the Site, if not addressed
by implementing the response action selected in this ROD, may present an imminent
and substantial endangerment to public health, welfare, or the environment.


DESCRIPTION OF THE SELECTED REMEDY

The remedial action described in this document represents the second of two planned
phases or operable units at the Vega Alta Site. It addresses the remaining source of
contamination and is designated Operable Unit II (OU-ll). A ROD for Operable Unit I
(OU-I), which addresses groundwater contamination at the Site, was signed in
September 1987 and amended by two subsequent Explanation of Significant
Differences (ESDs) in 1989 and 1994.

Currently, the groundwater is being addressed by an extraction and treatment system
placed in operation in 1994 pursuant to an EPA Unilateral Administrative Order issued
in 1 989 to the Potentially Responsible Parties (PRPs).

-------
The major components of the selected remedy, identified in this document as
Alternative 2, include:

      •     Operation of a Soil Vapor Extraction (SVE) system to remove Volatile
         -  Organic Compounds (VOCs) from soil until such time as VOCs can be no
            longer effectively removed.  Soil vapors will be treated, if necessary, by
            thermal/catalytic oxidation or granular activated carbon (GAG) before
            being emitted to the atmosphere.  Emissions will comply with the
            requirements established by the EQB;

      •     Implementation of a system monitoring program which includes the
            collection and analysis of soil vapors before and after they are treated, if
            treatment is determined to be necessary; and

      •     Appropriate environmental monitoring to ensure the effectiveness of the
            remedy.

DECLARATION OF STATUTORY DETERMINATIONS

The selected remedy meets the requirements for remedial actions set forth in CERCLA
§121,42 U.S.C. §9621:  (1) it is protective of human health and the environment; (2) it
attains a level or standard of control of the hazardous substances, pollutants and
contaminants, which at least attains the legally applicable or relevant  and appropriate
requirements (ARARs) under federal and  state laws; (3) it is cost-effective; (4) it utilizes
permanent solutions and alternative treatment (or resource recovery)  technologies to
the maximum extent practicable; and (5) it satisfies the statutory preference for
remedies that employ treatment to reduce the toxicity, mobility, or volume of the
hazardous substances, pollutants or contaminants at a site.

A review of the remedial action pursuant to CERCLA §121 (c), 42 U.S.C. §9621 (c), will
be conducted five years after the commencement of the remedial action to ensure that
the remedy continues to provide adequate protection to human health and the
environment, because this remedy will result in hazardous substances remaining on the
Site above hearth-based levels.

-------
        DECISION SUMMARY




     Vega Alta Public Supply Wells Site



         Vega Alta, Puerto Rico
U. S. ENVIRONMENTAL PROTECTION AGENCY




              REGION If




          New York, New York

-------
                      TABLE OF CONTENTS

       w •

DECISION SUMMARY                                       PAGE


I.  SITE LOCATION AND DESCRIPTION	 1

II.  SITE HISTORY AND ENFORCEMENT ACTIVITIES	 1

III.  HIGHLIGHTS OF COMMUNITY PARTICIPATION  	 3

IV.  SCOPE AND ROLE OF OPERABLE UNIT OR RESPONSE ACTION
   WITHIN SITE STRATEGY	 3

V.  SUMMARY OF SITE CHARACTERISTICS	4

VI, SUMMARY OF SITE RISKS	8

VII.  REMEDIAL ACTION OBJECTIVE	 11

VIII. DESCRIPTION OF ALTERNATIVES	 12

IX.  SUMMARY OF COMPARATIVE ANALYSIS OF ALTERNATIVES	 15

X.  DESCRIPTION OF THE SELECTED REMEDY 	,	19

XI.  STATUTORY DETERMINATIONS  	'.	 19


ATTACHMENTS

APPENDIX A -FIGURES

APPENDIX B -TABLES

APPENDIX C - COMMONWEALTH OF PUERTO RICO ENVIRONMENTAL.
            QUALITY BOARD LETTER OF CONCURRENCE

APPENDIX D - RESPONSIVENESS SUMMARY

APPENDIX E - ADMINISTRATIVE RECORD INDEX

-------
I.     SITE LOCATION AND DESCRIPTION

The Vega Alta Public Supply Wells Site is located north of the town of Vega Alta in the
municipality of Vega Alta, Puerto Rico. Vega Alta is a municipality of about 36,500
people (U.S. Census Bureau 1990) located in the central part of the north coast of
Puerto Rico, about 20 miles west of San Juan (Figure 1). Groundwater is the primary
source of water for the public water supply system, as well as for other private
(industrial, commercial and agricultural) users. The Vega Alta well field;and wells of
the nearby municipalities of Vega Baja and Dorado have been estimated to be extract-
ing approximately 18.7 million gallons per day (mgd) of water from the unconfined
limestone aquifer.

The Site does not have specific boundaries; however, most of the data collection
activities have been conducted over an area bounded by the Atlantic Ocean to the
north and the U.S. Geological Survey (USGS) Vega Alta Quadrangle boundary to the
south.  The east and west boundaries correspond with longitudes W66° 15' and
W66°23', respectively. This area is referred to as the Vega Alta Study Area (Figure 2).
The Puerto Rico Industrial Development Company (PRIDCO) Industrial Park, which
was the focus of the OU-II source investigation, is located within the Vega Alta Study
Area along Highway 2.

PRIDCO leases the property and buildings,  except for two buildings purchased from
PRIDCO by The West Company, to industries for their various manufacturing
operations. The industrial facilities currently in this area include: ROVIPACK (formerly
Motorola Radiomobile de P.R., Inc.), General Electric Pilot Devices  Inc., Harman
Automotive P.R., Inc., The West Company Plastic Container Division of P.R., Inc., Hi-
Temp Corporation,  Teledyne Packaging P.R., Inc. (Teledyne), and General Electric
Controls Inc. (GE Controls)  (Figure 3).                    .          '       .

II.    SITE HISTORY AND ENFORCEMENT ACTIVITIES

The Vega Alta municipal well field became a concern of the EPA in June 1983 after the
discovery of trichloroethene (TCE) in a groundwater sample collected by the USGS
from a public water supply well (Ponderosa Well). Table 1 identifies a chronology of
events for the Site,  starting  with the discovery of TCE in groundwater in June 1983 and
continuing through  March 1993.  The Puerto Rico Aqueduct and Sewer Authority
(PRASA) shut down the Ponderosa Welt in the same month.  In August 1983, PRASA
ceased pumping supply well GE-1. In June 1983, PRASA constructed supply well
Bajura 5(3) (also referred to as either Bajura 3 or Bajura 5).  Public water-supply wells
Bajura 5(3),  Bajura 1, and GE-2 were subsequently shut down in early 1989 after
PRASA constructed a pipeline between the  Vega Alta distribution system and the
Maguayo well field. PRASA completed two  new supply wells, Maguayo 6 and 7, in
October 1988 and November 1988, respectively.

-------
In September 1983, the EPA contracted with NUS Corporation to perform the OU-I
Remedial Investigation and Feasibility Study at the Site to determine the nature and
extent of the groundwater contamination.  NUS Corporation, with cooperation from the
USGS, conducted a field investigation from April 1984 to March 1985. The findings of
the NUS Corporation OU-I investigations were documented in a Remedial Investigation
Report (RIJ (NUS Corporation 1986). Using the R! data, NUS conducted a Feasibility
Study (FS) and recommended a groundwater remedy (NUS Corporation 1987).

The Vega Alta Site was included on the Superfund National Priorities List (NPL) on
September 1, 1984.

In September 1987, the EPA issued a Record of Decision for OU-I selecting a remedial
alternative for the remediation of groundwater and requiring the provision of a drinking
water supply for Vega Alta. The ROD called for the extraction of groundwater using
four water supply wells (GE-1, GE-2, Bajura 3, and Ponderosa) owned by PRASA and
the installation of treatment systems on each of these wells. Treated water pumped
from three of the wells was to be discharged to the PRASA distribution system.  The
ROD also  indicated that a subsequent OU-I I RI/FS would be needed to locate and
remediate VOC sources.

In March 1989, in response to a request from  EQB,  EPA modified the 1987 ROD
remedy through use of an ESD  to require surface discharge of all treated water instead
of discharge to the PRASA water supply distribution system.  This action was taken
pursuant to Section 117(c) of CERCLA. At the same time, EPA issued a Unilateral
Administrative Order that required Caribe General Electric Products, Inc., Harman
Automotive P.R. Inc., Motorola Telcarro de Puerto Rico, Inc., The West Company, and
PRIDCO, to implement the OU-I ROD-selected remedy, as modified by EPA's March
1989 ESD.

The Ponderosa Well Treatment System was completed on December 22, 1993 and
groundwater treatment commenced in July 1994. Treated water from the Ponderosa
system is currently being discharged to Honda Creek.  On August 30, :1994, EPA
modified the remedy authorized by the 1987 OU-I ROD and 1989 ESD by replacing the
groundwater extraction and treatment from GE-1, GE-2 and Bajura 3 with a new
extraction well and treatment system to be located approximately 4,000 feet north of the
Ponderosa Well.  EPA made this change to the selected remedy because OlMI
groundwater investigations at the Site showed that in the six years following the
issuance of the OU-I ROD, the  plume of groundwater contamination had migrated
downgradient of three of the extraction wells (GE-1, GE-2, and Bajura 3) selected in the
1987 OU-I ROD, and that these wells were no longer capable of effectively remediating
the Vega Alta aquifer.

-------
In light of several factors, EPA has reconsidered the plan called for by the 1994 ESD
and is considering an alternative approach of placing the new extraction wells closer to
the primary remaining source of VOC contamination at the Site. With EPA oversight, a
contractor for the potentially responsible parties (PRPs) has conducted modeling and
other studies designed to help EPA evaluate such a change to the OU-1 groundwater
remedy. EPA expects to make a decision regarding the groundwater remedy in the
near future; such a change would be documented in a separate public notice and
decision document.

III.    HIGHLIGHTS OF COMMUNITY PARTICIPATION

The Remedial Investigation Report, Feasibility Study Report, Proposed Plan and
additional supporting documents were released to the public for comment on July 30,
1997. These documents were made available to the public in both the Administrative
Record and information repositories maintained at the EPA Docket Room in the Region
II New York City Office, the EPA Caribbean Environmental Protection Division, the
Vega Alta Municipal Town Hall at Vega Alta, Puerto Rico, and at the EQB Library. The
notices of availability for the 1997 documents were published in two local newspapers,
"El Nuevo Dia" and  "The San Juan Star" on July 30, 1997.  A public comment period
was held from July 30, 1997 through August 29,1997.  On August 20, 1997, a public
meeting was held in the Vega Alta Municipal Assembly Room.  At that meeting,
representatives from EPA presented the findings of the investigations and answered
questions from the public about the Site and the remedial alternatives under
consideration.  Responses to,the comments received during the comment period are
included in the Responsiveness Summary (see Appendix D).

IV.   SCOPE AND ROLE OF OPERABLE UNIT II OR RESPONSE ACTION WITHIN
      SITE STRATEGY

EPA is proposing soil vapor extraction (SVE) as the appropriate cleanup technology
for the contaminated soils at the Site.  The results of the OU-II Rl and Supplemental
Groundwater Investigations indicate that the southeastern area of the Industrial Park
contains significant levels of VOCs in  the subsurface soils that are of concern as they
contribute to continued degradation of the groundwater aquifer. Treatment of the
contaminated groundwater aquifer, which was addressed by the OU-I remedy, com-
menced on July 1994 and is currently ongoing. The treatment system is located  at the
Ponderosa Well and is operating at a pumping rate of approximately 600 gallons per
minutes (gpm).

The application of SVE to the subsurface soils under OU-II will significantly reduce the
concentrations of VOCs in soils, thus  reducing their vertical migration and impact to the
groundwater.  In turn, this action will reduce the length of time required to achieve
groundwater cleanup by preventing VOCs from continuing to enter the groundwater.

-------
V.    SUMMARY OF SITE CHARACTERISTICS

During the OU-II Ri, several media were sampled for the presence of VOCs in three
investigatory phases. In Phase I, a comprehensive soil-gas survey was implemented, a
geophysical survey was undertaken to identify areas where metal objects may be
buried, and the results of septic tank sampling were reviewed. Based on these results,
locations in the PRIDCO Industrial Park were selected for drilling soil borings and
excavating test pits, activities that were implemented in Phase If.

Groundwater samples were collected from public and private water-supply wells and
monitoring wells during Phase I.  During Phase II, grab samples of groundwater were
collected from the boreholes that penetrated the water table, and two of the boreholes
in the eastern portion of the Industrial Park were converted into permanent monitoring
wells screened in the upper portion of the unconfined aquifer.  Because relatively high
VOC concentrations were detected in the eastern portion of the Industrial Park during
Phases  I and II, Phase III was implemented. Phase HI consisted of the installation of
three new multiport wells and two 6-inch diameter test wells.

A.    Site Geology and Hydrology

The Vega Alta  Study Area is part of the North Coast Limestone of Puerto Rico (Gi.usti
and Bennett 1976; Monroe 1976). The surface and subsurface geologic units in this
area are Oligocene to Migocene age, sedimentary formations that consist primary of
limestone. These formations  are overlain by semi-consolidated to unconsolidated
Quaternary deposits. The dip of the limestone formations in the study area is about 2
to 4 degrees to the north.  The areal distribution and detailed  descriptions of these
formations are  presented on the USGS geologic map of the Vega Alta quadrangle
(Monroe 1963), A significant  feature of this area is the formation of karst landforms that
has developed due to dissolution of the limestone by water.

An  unconfined (or water-table) freshwater aquifer is present throughout the Vega Alta
Study Area.  At the center of the study area, this aquifer is as great as 350 feet thick.
According to data obtained from PRASA and USGS files, approximately 6.78 billions
gallons of water were extracted from the aquifer by public and private water supply
wells in  the study area in 1990.  This water was pumped at an average rate of about
12,900 gallons per minutes (gpm) or 18.5 millions gallons per day (mgd).

Hydrogeologic units underlying the regional area consist of an unconfined (or water-
table) aquifer, an aquitard, and confined aquifer. The unconfined aquifer is composed
primarily of the Aguada and Aymamon Limestone, but it also occurs in some of the
alluvial and blanket sand deposits.  The primary groundwater flow through the

-------
limestone aquifer occurs within solutionally enlarged primary pores and solution
channels. Water occurs in primary pores and in secondary pores formed by dissolution
of the limestone. Because of the large size of these secondary pores and the extent to
which they are interconnected, these solution features have a significant impact on
groundwater flow.

Groundwater withdrawal from wells in the north coast limestone aquifer serves as the
primary source of water for drinking, agriculture, and industrial use in the Vega Alta
Study Area.  Prior to the 1960's and the large-scale development in the Vega Alta area,
the principal discharge location for groundwater was probably the coastal plain
(Gomez-Gomez and Torres Sierra 1988). In 1983, approximately 76 percent of
groundwater discharge was through pumpage from water supply wells.  The remaining
groundwater discharged either to the ocean or to rivers close to the coast. There is no
evidence of cave conduits discharging groundwater in the coastal plain nor in the
submarine outcrop of the aquifer.

Along the shores of the Atlantic Ocean in the coastal plain, the bottom of the.
unconfined freshwater aquifer is delineated by the saltwater interface. In  the study
area, the saltwater interface starts below the seabed and dips to the south where it
terminates at the low-permeability claystones at the top of the Cibao Formation (Torres-
Gonzalez and Diaz 1984).  A confined aquifer occurs below the upper member of the
Cibao Formation. This  upper member is a claystone with very low permeability that
acts as an aquitard (Giusti 1978).

B.     Nature and Extent of Contamination

1.    Initial Source Investigation                                      .

The initial source investigation (Phase I) was conducted at the, Vega Alta  Municipal
Landfill and the PRIDCO Industrial Park, since these areas had been identified as .
potential sources of VOCs detected in the aquifer (NUS Corporation 1986). Methods
initially used to identify potential source areas for VOCs in soil and possible
mechanisms for release of VOCs to soils included a soil-gas eurvey, a geophysical
survey, and underground storage tank (UST) and septic system sampling.

a. Soil Gas Survey

A soil-gas survey was conducted from February through April 1992 at the Industrial
Park and the Vega Alta Municipal Landfill. The presence of VOCs in the soil gas is an
indication that VOCs are present in the general vicinity of the sampling area. Sampling
and laboratory analysis of soil and groundwater in those areas confirmed their
presence and along with the concentrations of these compounds in various media.

-------
Due to the large area covered by the soil-gas survey, the sampling grid in the Industrial
Park was divided into 16 survey areas; these areas are listed in Table 1.  Total
concentrations for target VOCs in the Industrial Park are provided in Table 2 and are
shown at four concentrations ranges [e.g., 0.11 to 1.0 part per million by volume
(ppmv)], oh'Figure A. A statistical summary (detection frequencies and concentrations
ranges) of the data in Table 2 is provided in Table 3.

As shown on Figure 4, the following areas have relatively high (greater than 1.0 ppmv)
VOC soil-gas concentrations: Caribe GE Pilot Plant parking lot and the area south of
the Pilot Plant Building No.1, the area north of the building formerly occupied by The
West Company, the area adjacent to the east side of the Harman Automotive building,
the area between the two West Company buildings, the area north of the GE Controls
Plant, and the narrow area between the GE Controls Plant and the Teledyne Plant.
The soil-gas survey in the municipal landfill consisted of sampling 38 soil-gas points.
The location of each soil-gas collection point is shown on Figure 5 and the
corresponding VOC concentrations are presented  in Table 4, Total target compound
concentrations ranged from 0.04 to 28.63 ppmv. VOCs were detected in 37 percent of
the samples analyzed.

b. Geophysical Survey

Eight distinct areas within the Industrial Park were surveyed with magnetic and
electromagnetic methods.  Only limited areas were selected for the geophysical survey
due to the considerable coverage of the Industrial Park buildings, fences, parking lots,
and other man-made sources of magnetic interference. Figure 6 shows the surveyed
areas and significant magnetic anomalies at the Industrial Park.
                                *

c. LIST and Septic System Results

A comprehensive site reconnaissance for existing or. abandoned underground storage
tanks (USTs) and septic systems was conducted as part of the OU-II Rl.  No active or
inactive USTs were identified within the Industrial Park. Abandoned septic system
components that were identified at the GE Controls, Teledyne, and other properties
located throughout the Industrial Park were either not physically accessible or did not
contain adequate liquids for sampling. Therefore,  no samples were collected from
these septic systems.   Septic tanks at the Teledyne and Motorola facilities were
sampled as part of separate facility investigations. The analytical results of liquid and
sludge samples collected from the septic tanks at the Teledyne facility are presented in
Table 5 and Table 6.

A sample collected from a septic tank at the former Motorola facility detected only one
compound 1,2-DCA, at a concentration of 14 parts per billion (ppb).

-------
2.    Soil Investigation

A soil investigation (Phase II) was conducted in the vicinity of the Industrial Park to
evaluate the presence, nature, and extent of VOCs in soil and to analyze soil samples
for geotecnnical and microbiological parameters. Soil samples were collected from
boreholes and test pits and analyzed.

Approximately 550 spit-barrel samples were collected from 40 boreholes (Figure 7)
Each split-barrel soil or weathered limestone sample taken from the borehole was
analyzed for VOC concentration with the field gas chromatograph (GC). Twenty-four of
these samples were sent to the Contract Laboratory Program (CLP) laboratory for
analysis for Target Compound List (TCL) VOCs.  The laboratory analytical results and
the field GC  results are presented in Tables 7 and 8, respectively.  Figure 5 shows the
highest concentrations of TCE and PCE detected in soil samples from each borehole.

VOCs have been detected in soils beneath each of the facilities investigated at the
Industrial Park by either the soil-gas survey or the borehole investigation, or both. The
highest VOC concentrations were detected in the soils on the eastern section of the
Industrial Park.

The  highest  concentration of VOCs in soil was found in a sample from Borehole BH-
25A at a depth interval of 29.5 feet to 31.5 feet. Concentrations of Trichloroethene
(TCE) and Perchloroethene (PCE) in this sample, as detected by the CLP laboratory,
were 2,200 ppb and 1,400 ppb, respectively. This sample also had the highest
concentration of VOCs, detected by field GC, of more than 500 soil samples. No
individual target VOCs were detected at concentrations above 1 ppm  in any soil
samples collected from shallow depths. All VOCs detected above 1 ppm occurred at
depths greater than 19 feet below land surface (bis).                         .

3.    Groundwater Investigation

Groundwater samples were collected throughout the Vega Alta Study Area from 57
monitoring and water-supply wells as part of Phase I of the OU II Rl. These
groundwater samples were analyzed for VOCs, landfill leachate parameters,, and
metals.  Grab groundwater samples were collected from some of the boreholes drilled
during Phase II  and analyzed for VOCs,  The two shallow monitoring wells and the
three new multiport wells installed during Phase III were also sampled and analyzed for
VOCs.

All groundwater samples collected from the 23 multiport wells (all zones), the six
conventional monitoring wells, and the 28 water-supply wells in Phase I were analyzed
for VOCs. The  validated VOC results for samples collected during  the OU  II
investigation are summarized in Table 9. VOCs were identified in the groundwater

-------
samples collected during the 1992 sampling event. These VOCs, the frequency of their
detection, and their maximum concentrations are presented in Table 10. The maximum
TCE concentration {2,800 ppb) was detected in the multiport well BVAW22. Figure 8
shows the horizontal TCE distribution using the maximum concentration detected in
each multiport well; this figure  provides a comprehensive view of the full horizontal
extent of the TCE plume.  The length and width of the TCE plume, as defined on
Figure 8 by the 5 ppb contour, are 2.2 and 2.4 miles,  respectively.

Three multiport monitoring wells, two conventional monitoring wells, and two large
diameter wells were installed along the eastern side of the Industrial Park as part of
Phase II and Phase III of the OU II Rl. The results of these analyses are provided in
Table 11, and the frequencies of detection and maximum concentrations of VOCs are
provided in Table 12. TCE was detected at a maximum concentration of 4,600 ppb.
Figure 9 shows the horizontal distribution of the highest quantifiable TCE  concentration
in groundwater from monitoring wells in the vicinity of the eastern side of the Industrial
Park.                                                        .

VI.  SUMMARY OF SITE RISKS

Based upon the results of the Oil-!! Rl, a Baseline Risk Assessment was conducted to
estimate the risks associated with current and future  Site conditions. This Risk
Assessment evaluated human health risks associated with both current and future land
uses, assuming no further remedial actions were taken.  Risks were evaluated  based
upon potential human exposure to contaminants currently present in Site groundwater.
The Baseline Risk Assessment assumed that the Site would be developed for
residential use in the  future. This assumption is based on the local zoning and
predicted future land  use in the area.                                   ; •

The data used in the  Baseline Risk Assessment included groundwater samples
collected by Geraghty & Miller and COM Federal during  1992 and 1993, and additional
data collected by the  Unisys Corporation, a PRP, for inorganic analyses (during May
and June 1995).  The assessment also included an evaluation of site-specific soil
screening levels to prevent further degradation of the groundwater  from subsurface
soil contamination at  the site.  Soil screening levels were derived for the specific
chemicals found in groundwater underlying the Site.

Risk to human health is defined as the likelihood that people living, working or  playing
on or near the Site may experience health problems as a result of their exposure to
contaminants from the Site. The ecological risk evaluation appraises actual or potential
effects of the Site on  plants and animals.
                                       8

-------
A.    Human Health Risk Assessment

A four-step process is utilized for assessing site-related human health risks for a
reasonable exposure scenario: "Hazard Identification" identifies the contaminants of
concern at-3 site based on several factors such as toxicity, frequency of occurrence
and concentration. "Exposure Assessment" estimates the magnitude of actual and/or
potential human exposures, and the pathways (e.g., ingestion of contaminated well
water) by which humans are potentially exposed. "Toxicity Assessment" determines the
types of adverse health effects associated with the chemical exposures and the
relationship between the magnitude of exposure (dose) and severity of adverse effects
(response).  "Risk Characterization" summarizes and combines outputs of the exposure
and toxicity assessments to provide a quantitative (e.g., one-in-one million excess
cancer risk) assessment of site-related risks.

The Baseline Risk Assessment began with selecting contaminants of concern in the
groundwater which would be representative of Site risks. Both VOCs and inorganics
were identified as chemicals of potential concern. VOCs included: 1,1-dichloroethene,
1,2-dichloropropane, ethylene dibromide, tetrachloroethene, trichloroethene, and vinyl
chloride.  Inorganics  included: arsenic, beryllium, vanadium and zinc.  Many of these
chemicals are known or potential human carcinogens based on either human evidence
or data from laboratory animal  studies.
The exposure assessment evaluated the health effects which could result from .
exposure to contaminants as a result of the ingestion of the groundwater, contact with
the skin or inhalation of VOCs.  The exposure pathways generally consist of four
elements: a source and mechanism of release; a transport medium; an exposure point
(point of contact); and an exposure route (ingestion, inhalation, or dermal contact) at
the exposure point. Exposure scenarios involving groundwater were quantitatively
assessed.  Current exposures were not assessed since contaminated groundwater at
the Site Is not currently being used as a drinking water source. The potential exists,
for further commercial or residential development of the Site in the future.  Therefore, in
the future,  there is a potential for individuals to obtain their drinking water from wells
installed into the contaminated aquifer beneath the Site. Potentially exposed
individuals are: 1) future Site  residents, 2) future Site workers and  employees;  and 3)
future construction workers.

1.     Evaluation of Risks

For carcinogens, risks are estimated as the  incremental probability of an individual
developing cancer over a lifetime as a result of exposure to the potential carcinogen.
The risks of the individual chemicals are summed for each pathway to develop a total

-------
risk estimate. The acceptable risk range is one in ten thousand to one in a million of an
individual developing cancer over a 70-year lifetime from exposure to the
contaminant(s).

To assess the overall noncarcinogenic effects posed by more than one contaminant,
EPA has developed the Hazard Quotient (HQ)  and Hazard Index (HI). The HQ is the
ratio of the chronic daily intake for a contaminant to the Reference Dose for the
chemical; the reference dose being a measure of the chemical's "threshold" for adverse
effects with many built-in safety factors.  The HQs are summed for all contaminants
within an exposure pathway (e.g., groundwater ingestion) to give the HI. When the HI
exceeds 1.0, there may be concern for potential noncarcinogenic health effects^ if the
contaminants in question are believed to cause a similar toxic effect.

EPA bases its decision to conduct site remediation (cleanup) on the risk to human
health and the environment.  Cleanup actions may be taken when EPA determines that
risk at a site exceeds the cancer risk level of one-in-ten-thousand or if the
noncarcinogenic HI exceeds a level of 1.0. Once either of these thresholds have been
exceeded, remedial  action alternatives are evaluated to reduce the risk levels to within
EPA's acceptable risk range of one-in-ten-thousand to one-in-a-million and an HI of
1.0.

2.    Toxicity Assessment/Risk Characterization

a.    Future Residents

The results of the Baseline Risk Assessment indicated that the highest carcinogenic
risks were attributable to groundwater ingestion exposure for future Site residents and
workers/employees.  Groundwater was found to pose a carcinogenic risk to future
residents' human health for the ingestion and inhalation routes of exposure over a
chronic duration. The ingestion route showed total carcinogenic risks for adults and  •  .
children of 2.6 in 1,000 and 1.2 in 1,000, respectively. The primary chemicals
contributing to this risk include: 1,1-dichloroethene, ethylene dibromide,
trichloroethene, arsenic and beryllium.  The inhalation route through showering showed
a carcinogenic risk for future Site resident adults of 3.7 in 10,000.  The main chemicals
contributing to the risk are 1,1 -dichloroethene and trichloroethene.  Dermal exposure
was associated with a risk of 3.8 in 1,000,000 which is within EPA's acceptable risk
range.

The carcinogenic risks for future Site residents are greater than the upper-bound of
EPA's target risk range.

Non-carcinogenic hazards were also assessed. For non-carcinogenic effects, the HI
for adults and children for ingestion of contaminated groundwater are 9.4 and 22,


                                      10

-------
respectively.  The main chemicals contributing to this risk are trichloroethene and
arsenic. These values exceed EPA's target level of 1.0.

b.    Future Site Workers/Employees
          •T -
Groundwater was found to pose an unacceptable carcinogenic risk to human health
through ingestion for future Site workers and employees. The ingestion route showed
a carcinogenic risk for Site workers/employees of 7.8 in 10,000. This risk exceeds the
upper-bound  of the target risk range. The chemicals contributing to this risk are: 1,1-
dichloroethene, ethylene dibromide, and arsenic. The HI for potential future Site
workers/employees ingestion of groundwater is 3.4, exceeding the target level of 1.0 for
non-carcinogens. The chemicals contributing to the hazard is trichloroethene.

c.    Future Construction Workers

The carcinogenic risk and HI for future construction workers at the Site are 8.1 in one
million and 0.26, respectively. These risks and hazards do not exceed EPA's risk
range for carcinogens and non-carcinogens.

3.    Contribution of Soil Contaminants to Groundwater

To prevent further degradation of the groundwater at the Site from subsurface soil
contamination, soil screening levels (SSLs) were derived for specific chemicals found
in the groundwater.  The chemicals selected for evaluation were those determined to
be of potential public health concern based on the risk assessment discussed in the
previous section. The SSLs developed represent concentrations in soils that would be
protective of groundwater use based on the maximum concentration levels in the
groundwater.

An SSL is defined as "a chemical concentration in soil below which there is no concern
for ingestion,  inhalation, and migration to groundwater exposure pathways, provided
certain conditions are met."  The SSLs were calculated using site-specific data (i.e.,
aquifer thickness, aquifer recharge rate, source area length,  organic carbon content,
etc.).  The analysis was developed using EPA's 1994 Final Soil Screening Level
Guidance ( EPA OSWER Guidance 540-R-96-018),

The available subsurface soil samples for organic chemicals were limited.  A model
was used to calculate SSLs for the following chemicals of concern: 1,1-dichloroethene,
1,2-dichloropropane, ethylene dibromide, tetrachloroethene, trichloroethene, and vinyl
chloride.  Inorganics included arsenic, beryllium, and zinc. Vanadium was not
evaluated based on the lack of appropriate partition coefficients.
                                       11

-------
Based on the results from this model, the predicted SSLs were exceeded by the
maximum concentrations detected in soil.  Comparison of the predicted SSLs based on
the Maximum Contaminant Levels (MCLs) to the maximum concentrations in soil
resulted in exceedances ranging from 3.5 to 95 for tetrachloroethene, trichforoethene
and 1,1-dichloroethene.

4.    Conclusions

The Baseline Risk Assessment results indicate that ingestion of groundwater poses an
unacceptable risk for carcinogens and/or noncarcinogens for future Site residents and
future Site workers/employees.  Actual or threatened releases of hazardous substances
from the Vega Alta Site, if not addressed by the selected remedy or one of the other
active measures considered, may present a current or potential threat to public health,
welfare or the environment. The analysis of the comparison of the SSL based on the
MCL of the contaminant in groundwater to the maximum concentration in soil resulted
in exceedances ranging from 3.5 to 95 times the value.

B.    Ecological Risk Assessment

Subsurface soils and groundwater contamination do not present a risk to ecological
receptors at the Site.  There is no ecological receptor exposure to subsurface soils.
Groundwater is not considered to pose a concern to ecological receptors for the
following reasons:

      Maximum VOC concentrations in groundwater samples collected from 1984 to
1993 indicate that the VOCs for which there are Ambient Water Quality Criteria
(AWQC) are not likely to pose an ecological risk to fresh water aquatic receptors at the
Site. In  the unlikely event that the highest detected concentrations of the groundwater
plume were to reach an aquatic receptor, the maximum concentrations are distinctly
lower than the AWQC values for the VOCs that possess such values.                .

      Groundwater discharge into the marshland north of the Site is expected to be
minimal, if it occurs at all. The watertable surface has declined considerably in the past
20 years due to such factors as increased groundwater pumping, the presence of man-
made marshland drainage channels, and reduced yearly rainfall.          :
VII. REMEDIAL ACTION OBJECTIVES

Remedial action objectives are specific goals to protect human health and the
environment. They specify the contaminant(s) of concern, the exposure route(s),


                                      12

-------
receptor(s), and acceptable contaminant level(s) for each exposure route. These
objectives are based on available information and standards such as applicable or
relevant and appropriate requirements (ARARs) and risk-based levels established in
the risk assessment.

The overall remedial action objective for the Site is to prevent human ingestion and
inhalation through showering of Site-related VOCs in excess of the Maximum
Contaminant Levels (MCLs) in groundwater or the more stringent contaminant levels
specified in the OU-1 Administrative Order. While doing so, it will restore the aquifer to
its previous conditions and will remove the contaminants in the soils known to contain
the highest concentrations as a source control measure to prevent further groundwater
contamination.

The implementation of this proposed action in the subsurface soils will significantly
reduce the concentrations of VOCs in soils, thus reducing their vertical migration to  the
groundwater. This action will also reduce the length of time required to achieve
groundwater cleanup.

The specific objectives of the OU-II remedial action are:

To reduce the concentrations of VOCs in the areas of the Site known to contain the
highest concentrations of VOCs in the soil matrix, to the extent technologically feasible,
and thereby reduce the potential risk to human health through exposure to
groundwater.

To reduce the  leaching of VOCs from the areas of the Site known to contain the highest
VOC concentrations into the groundwater and thereby enhance the existing QU-I
groundwater remedy.                                                  '      :

VIII.    DESCRIPTION OF ALTERNATIVES

CERCLA (commonly referred to as "Superfund") requires that each selected site
remedy be protective of human health and the environment, be cost effective, comply
with other statutory laws, and utilize permanent solutions and  alternative treatment
technologies and resource recovery technologies to the maximum extent practicable.
In addition, the statute includes a preference for the use of treatment as a principal
element for the reduction of toxicity, mobility, or volume of the hazardous substances.

The FS Report evaluated three presumptive soil remediation alternatives for address-
ing the contamination associated with OU-II.  Construction times for each alternative
include the time to construct and implement the remedy but do not include the time
required to design the remedy, negotiate with the PRPs, or procure contracts for design
and construction.
                                       13

-------
Presumptive remedies, as defined by the EPA, are "preferred technologies for common
categories of sites, based on historical patterns of remedy selection and EPA's
scientific and engineering evaluation of performance data on technology
implementation"  (EPA OSWER  Directive 540-F-93-047). Presumptive technologies
are expected to be used at appropriate sites. The benefit of the presumptive remedies
initiative is that it streamlines the remedy selection process by eliminating such steps
as: identifying potential treatment technologies and containment/disposal requirements;
screening those technologies; assembling the remaining technologies into alternatives;
and screening  alternatives as necessary to reduce the number subject to detailed
analysis.

The EPA presumptive remedies for Superfund sites containing VOC-contaminated soil
and meeting certain criteria are sot! vapor extraction (SVE), thermal desorption, and
incineration (EPA OSWER Directive 540-F-93-048). These technologies have been
chosen based  upon EPA's experience at other Superfund sites and are discussed
below.

The time to implement the remedy includes an estimated time frame for the design of
the remedy, construction of the remedy, and period of negotiation with the responsible
parties for implementation of the remedy.

Alternative 1:  No Action

The Superfund program requires that the "No-Action" alternative be considered as a
baseline for comparison with the other alternatives. The "No Action" alternative for
soils would involve no effort to prevent the further leaching of compounds from the soils
to the ground water. This alternative would result in the continued leaching'of chemical
compounds into the aquifer for an unknown period of time, affecting the quality of the
groundwater at the Site.  The costs for the No Action alternative are as follows:
  Capital Cost                                                             $ 0
  Annual O&M                                                             $ 0
  Present Worth Cost                                                .       $ 0
  Construction Time	Not Applicable
Alternative 2: Soil Vapor Extraction

The Soil Vapor Extraction (SVE) alternative removes volatile organic compounds from
the unsaturated zone as vapors, without excavation.  SVE is accomplished in-situ (in
place), by installing vents of various designs consisting of gravel packs extending to
the surface, slotted or unslotted well casings installed with or without gravel pack, or
any other configuration that allows gases to move from the soil. Passive systems
                                      14

-------
consist of vents that are open to the atmosphere and do not require energy for
extraction of gases.  Active systems make use of negative pressure or vacuum pumps
to accelerate the removal of vapors from the soil.

With SVE, the vapors are either discharged to the atmosphere or treated before
discharging, depending on vapor concentrations and regulatory requirements.

The limitations of the SVE are associated with soil characteristics that impede the
movement of vapors to the extraction well, emissions of volatiles, and explosion
hazards. Soils with limited pore space would require the use of more closely spaced
wells and possibly higher capacity pumps. The air emissions may be controlled by
using granular activated carbon (GAG) at the discharge point. Explosion hazards
associated with vapors can be overcome by using intrinsically safe equipment, and by
ensuring that adequate volumes of air are moved through the system to keep vapor
concentrations betow the lower explosion limit (LEL).

From August 16 through September 14,  1995, a soil vapor extraction performance
study was conducted at the General Electric Controls facility.  The study was
conducted to determined if SVE is an appropriate remedial technology to mitigate the
presence of VOCs.  A total of 553 pounds of VOCs were recovered during the study
indicating that SVE will effectively remove the VOC contamination from the on-site
soils.

The SVE system under this alternative will have the following characteristics:

- approximately 30 to 50 extraction wells, each with shallow and deep extraction
focused on soils within the GE  Controls facility.      •                 .

- the effective radius (zone of influence) for extraction wells has been estimated to be
32 to 60 feet, assuming a single well nest.      ^                            .

- connecting piping wilt be installed in order to transmit vapors containing VOCs to a
central  removal point and treatment of the exhaust air, if necessary,

- the SVE unit(s) may contain an air treatment system to ensure that air discharges do
not exceed permissible limits.  Air treatment may consist of thermal/catalytic oxidation
or granular activated carbon. No treatment will be necessary if the untreated.
discharges meet acceptable limits; this will  be determined during the remedial design
(RD) stage.

- the proposed SVE system will be designed and implemented in a staged approach
which will involve the use of at  least one mobile or permanent SVE unit.  The mobile
 SVE unit will be operated at a designated area until no more VOCs can be effectively
                                       15

-------
removed at that location.  The unit will then be moved to another designated area for
treatment. The designated areas of operation, type (mobile and/or permanent) and
number of SVE unit(s) to be used will be determined during the RD phase.
  Capital Cost                                                      $ 2,777,000
  Annual O&M                                    '                    $ 502,900
  Present Worth Cost (10 year operation)                            '  $ 7,473,000
  Present Worth Cost (4 year operation)                               $ 4,270,541
  Construction Time                                                    8 months
Alternative 3: Incineration

Incineration is an ex-situ technology which employs thermal decomposition via
oxidation at temperatures usually greater than 900 °C to destroy the organic fraction of
the waste.  As an ex-situ technology, the soil of concern must be excavated and either
transported to an off-site incineration facility or fed through an on-site mobile
incineration system. The primary benefit of incineration is that this method of treatment
destroys the hazardous material rather than transferring it from one media to another.

Incineration is not considered a feasible remedy for this Site due to its poor
implementability and high cost. Although incineration has relatively high destruction
efficiencies, it would be difficult to implement as a component of the remedy since
extensive soil excavation would be required. At this Site, VOCs in the "hot spots" are
found at depths of up to 90 feet below ground surface. Not only wouid the excavation
of this soil be difficult from an engineering standpoint, but it-would also likely/cause a
significant safety risk while the on-site facilities are operational.

Due to its impracticability, the incineration alternative will not be further evaluated  .
and/or considered.

Alternative 4: Low Temperature Thermal Desorption
                                                               /
Low Temperature Thermal Desorption (LTTD) is an ex-situ technology which uses
direct or indirect heat to vaporize organic compounds from soil, sediment, sludge, or
other solid  and semisolid matrices.  The vapors are then collected for further treatment.
As with incineration, LTTD requires the excavation and transportation .of contaminated
soils to  either an off-site treatment and disposal facility or to an on-site mobile unit.
Unlike incineration, LTTD only transfers the VOCs from the soil matrix to the  vapor
phase.  The VOCs must still be captured or destroyed using another technology such
as granular activated carbon filters  or catalytic oxidation.
                                       16

-------
The logistical difficulties described above for the incineration alternative would also
apply to LTTD.  LTTD would require extensive excavation and transportation of
contaminated soil to either an on-site mobile unit or an off-site facility.

Due to its impracticability, the LTTD alternative will not be further evaluated and/or
considered.

IX.    SUMMARY OF COMPARATIVE ANALYSIS OF ALTERNATIVES,

EPA has developed nine criteria (EPA OSWER Directive # 9355.3-01), codified in the
NCP § 300.430(e) and (f), to evaluate potential alternatives to ensure all important
considerations are factored into remedy selection.  This analysis is comprised of an
individual assessment of the alternatives against each criterion and a comparative
analysis designed to determine the relative performance of the alternatives and identify
major trade-offs, that is, relative advantages and disadvantages, among them.

The nine evaluation criteria against which the alternatives are evaluated are as follows:

Threshold Criteria - The first two criteria must be satisfied in order for an alternative to
be eligible for selection.

1 .    o      Overall Protection of Human Health and the Environment addresses
             whether or not a remedial alternative provides adequate protection and
             describes how risks posed through each exposure pathway (based on a
             reasonable maximum exposure scenario) are eliminated, reduced, or
             controlled through treatment, engineering controls, or institutional
             controls.                                             .

2.    o      Compliance with ARARs addresses whether or not a remedial
             alternative would meet all of the applicable or relevant and appropriate
             requirements (ARARs) of other Federal arid State environmental statutes
             and/or satisfy the criteria for invoking a waiver as set forth in CERCLA §
 Primary Balancing Criteria - The next five "primary balancing criteria" are to be used to
 weigh trade-offs among the different hazardous waste management strategies.

 3.     o     Long-Term Effectiveness and Permanence refers to the ability of a
             remedial alternative to maintain reliable protection of human health and
             the environment over time, once cleanup goals have been met.

 4.     o     Reduction of Toxicity, Mobility, or Volume evaluates the anticipated
             performance of the treatment technologies that a remedial alternative may


                                      17

-------
            employ, or how successfully particulartreatment methods could reduce
            the harmfulness or volume of contaminants, or their potential to move in
            the environment,

5.     o   -i - Short-Term Effectiveness addresses the period of time needed to
            achieve protection and any adverse impacts on human health that may be
            posed during the construction and implementation period until cleanup
            goals are achieved.

6.     o     Implementability evaluates the technical and administrative feasibility of
            a remedial alternative, including the availability of materials and services
            needed to implement a particular option.

7.     o     Cost considers estimated capital and operation and maintenance costs,
            and net present worth cost of the alternatives.
Modifying Criteria - The next two criteria are regarded as "modifying criteria," and are to
be taken into account after the above criteria have been evaluated.  They are generally
to be focused upon after public comments are received.

8.    o     State Acceptance indicates whether, based on its review of the SI Report
            and the Proposed Pjan, the Commonwealth of Puerto Rico concurs with,
            opposes, or has no comment on the preferred alternatives at the present
            time.

9.    o     Community Acceptance refers to the public's genera] response to
            the alternatives described in the Proposed Plan.

The following is a summary of the comparison of each alternative's strengths and .
weaknesses with respect to the nine evaluation criteria.

  1.   Overall Protection of Human Health and the Environment

Alternative 1 (No-Action) does not reduce the indirect human health risk posed by
VOC's present in soils that could migrate into groundwater.  Alternative 2 (SVE)
provides both short and long-term protection of human health and the environment by
reducing the concentration of VOCs in the soil.  The only potential future risk of human
health at this Site is from possible future ingestion of groundwater and inhalation
through showering.  Alternative 2 will be protective of human health and the
environment by enhancing the existing groundwater remedy by reducing the mass of
VOCs in the soils, thus preventing the further migration of the VOCs to the
groundwater.


                                       18                         ;

-------
  2.   Compliance with ARARs

Alternative 1 would not comply with ARARs since no remedial action is contemplated in
the alternative.  ARARs related to air quality are established by the Puerto Rico
Regulation for the Control of Atmospheric Pollution (PRRCAP), Rule 419 (Volatile
Organic Compounds). The PRRCAP rule establishes emission limits of 3 Ib/hr of total
VOCs and 15 Ibs/day. While Alternative 2 would require an examination of air quality
standards to ensure that emission limits are not exceeded, with the appropriate
monitoring and possible treatment controls placed on the SVE system, this alternative
will comply with air quality standards.

It should be noted that while there are no chemical-specific ARARs with respect to the
extent of soil cleanup that is necessary at the Site, Alternative 2 will enhance the goal
of the OU-I groundwater remedy to attain groundwater standards, while Alternative 1
will not.
 3.   Long-Term Effectiveness and Permanence

Alternative 1 does not provide long-term effectiveness because the risk posed by the
VOCs in on-site soils for potential future use of groundwater would not be reduced.
More specifically, the volume, toxicity and mobility of untreated wastes remaining in the
soils will not be reduced. While Alternative 2 would require some operational time to
ensure that VOCs have been effectively reduced, it will provide long-term effectiveness
by reducing VOC concentrations at the source, thereby enhancing the existing OU-!
groundwater remedy and reducing the future risk posed by the VOCs  leaching from the
soils into the groundwater.                         ;                    ; ;

 4.   Reduction in Toxicitv. Mobility, or Volume

Alternative 1 would not cause a reduction in the toxicity; mobility or volume of the   :
hazardous substances. Alternative 2 successfully reduces the volume, toxicity and
mobility of VOCs in the soils as VOCs will be removed from the source and either
treated through the use of vapor phase treatment techniques or released into the
atmosphere at levels complying with air quality standards. If concentrations are such
that air emissions do not require treatment, then the only waste stream which may
require some treatment would be the water collected from the air/water separator. The
mobility of the VOCs will also be reduced by Alternative 2 because the SVE system will
prevent the leaching of VOCs. from the soils into the groundwater.
                                       19

-------
 5.   Short-Term Effectiveness

Alternative 1 does not present any short-term risks to the community or on-site workers,
but the future risk posed by the leaching of VOCs from Site soils into the groundwater
will remain unabated.  In the absence of construction or mitigating activities, there
would be no short-term impacts under Alternative 1. Alternative 2 generally does not
present substantive risks to on-site workers or the community. Considerations must be
made for the prevention of dust emissions during the boring of extraction wells, the
disposal of soil cuttings from the wells, and potential air emission controls if levels are
higher than air quality standards would allow. The installation of an SVE system at the
GE Controls facility could involve the interruption of plant operations. Precautions
would be taken to safeguard the safety of plant personnel during construction of the
system.

 6.   Implementabilitv

Both alternatives evaluated could be implemented. Minor implementability problems
could be presented by Alternative 2 because of the limited space available at the GE
Controls facility for the installation of extraction wells and interconnecting header pipes.
Depending on the designated extraction well locations and the piping route, it is
possible that some of the construction may disrupt plant operations. Technically,
Alternative 2 should be relatively simple to implement. SVE technology has been
widely used at Superfund sites to address the problem of VOCs in soils; both the
necessary equipment and experienced contractors are readily available,

 7.   Cost

The cost estimate associated with Alternative 2 is provided above.  There are no
capital or long-term operation and maintenance costs associated with Alternative 1.
For Alternative 2, the estimated total net present worth for the construction and
operation of a SVE system over a four year period at a discount rate of 5% is
$4,270,541. Typically, successful SVE  systems operate for time periods much snorter
than thirty years.

 8.    State Acceptance

The EQB concurs with the preferred remedy. EQB's concurrence letter is attached
hereto as Appendix C.

 9. Community Acceptance

All comments are addressed in the Responsiveness Summary, which is attached
hereto as Appendix D.
                                       20

-------
X.    DESCRIPTION OF THE SELECTED REMEDY

Based on the results of the Rl and FS Reports, and after careful consideration of all
reasonable alternatives, EPA and the EQB have determined that Alternative 2 (SVE), is
the appropriate remedy for OU-II at the Site.  Specifically, the selected alternative will
consist of the following:

      Operation of a mobile or permanent SVE treatment system(s) to remove VOCs
      from contaminated soils until no more VOCs can be effectively removed. - Soil
      vapors will be treated, if necessary, before being emitted to the atmosphere.

      Implementation of a system monitoring program for soil vapor collection and
    * analyst's before and after air treatment, if necessary treatment is determined to
      be necessary.

      Appropriate environmental monitoring to ensure the effectiveness of the remedy.

EPA and EQB believe that the selected remedy will provide a high level of protection of
human health and the environment by reducing the concentrations of VOCs in the soil.
Toxicity, mobility and volume will be reduced permanently through treatment.
Moreover, this alternative will provide overall protection because it should reduce the
presence of VOCs at the Site through in-situ treatment such that the contaminated soil
no longer acts, as a source of contamination to the groundwater, thus enhancing the
existing OlM groundwater remedy.

The selected remedy will provide the best balance of trade-offs among alternatives with
respect to the evaluation criteria. EPA and EQB believe that the selected remedy will
be protective of human health and the environment, will comply with ARARs, will be
cost effective, and will utilize permanent solutions and alternative treatment technolo-
gies or resource recovery technologies to the maximum extent practicable. The remedy
also will meet the statutory preference for the use of treatment as a principal element.

XI.    STATUTORY DETERMINATIONS

As was previously noted, CERCLA §121(b)(1), 42 U.S.C. §9621(b)(1), mandates that a
remedial action must be protective of human health and the environment, cost-effective,
and utilize permanent solutions and alternative treatment technologies or resource
recovery technologies to the maximum extent practicable. Section 121(b)(1) also
establishes a preference for remedial actions which employ treatment to permanently
and significantly reduce the volume, toxicity, or mobility of the hazardous substances,
                                      21

-------
pollutants, or contaminants at a site. CERCLA §121(d), 42 U.S.C. §9621 (d), further
specifies that a remedial action must attain a degree of cleanup that satisfies ARARs
under federal and state laws, unless a waiver can be justified pursuant to CERCLA
§121(d)(4), 42  U.S.C. §9621(d)(4).

For the reasons discussed below, EPA has determined that the selected remedy meets
the requirements of CERCLA §121, 42 U.S.C. §9621.

1.    Protection of Human Health and the Environment

In order to meet the remedial objectives outlined in the previous section, the risk
associated with exposure to the contaminated groundwater must fall within the  •
acceptable risk range for carcinogens.

Alternative 2 will provide the best overall protection because it will eliminate the
presence of VOCs at the Site through in-situ treatment until no residual impacted soil
remains.

2.    Compliance with Applicable. Relevant and Appropriate Requirements

There are no chemical specific cleanup standards for contaminated soils.  ARARs
related to air quality are established by PRRCAP. The PRRCAP establishes emission
limits of 3 Ib/hr of total VOCs and 15 Ibs/day. At the present time, it is expected that air
emissions from the SVE will not be a problem. Air emissions will be monitored and, if
necessary, emissions controls will be placed on the system.

3.    Cost Effectiveness

The selected remedy provides  for overall effectiveness in proportion to its cost in
mitigating the risk posed by the contaminated soils. Section 300.430(f) (ii) (d) of the
NCP requires EPA to evaluate cost-effectiveness by comparing all the alternatives .
which meet the threshold criterion of protection of human health and the environment,
against the three additional balancing criteria of long-term effectiveness and
permanence; reduction of toxicity, mobility or volume through treatment; and short-term
effectiveness. The selected remedy meets these criteria and provides for overall
effectiveness in proportion to its cost. The selected remedy has a capital cost of
$2,277,000, annual O&M of $1,992,980, and a present worth of $4,270,000.

4.    Utilization of Permanent Solutions and Alternative Treatment Technologies
      to the Maximum Extent Practicable

The selected remedy utilizes permanent solutions and  alternative (innovative) treatment.
technologies to the maximum extent practicable. SVE  will significantly reduce the

                                      22

-------
concentrations of VOCs in soil, thus reducing their vertical migration to the
groundwater.  In turn, this action will reduce the length of time required to achieve
groundwater cleanup by preventing the VOCs from continuing to enter the groundwater.

5.    Preference for Treatment as a  Principal Element

The selected remedy's utilization of SVE to treat source area soils satisfies the statutory
preference for remedies that permanently and significantly reduce the toxicity, mobility,
or volume of hazardous substances.
DOCUMENTATION OF SIGNIFICANT CHANGES

There are no significant changes from the selected remedial alternative presented in
the Proposed Plan.
                                      23

-------
            FIGURES
VEGA ALTA PUBLIC SUPPLY WELLS SITE
     VEGA ALTA, PUERTO RICO

           APPENDIX A

-------
               ATLANTIC  OtfEAN
       **>     PUERTO  RIC
                                                                        GERACIITY
                                                                         MILLER.  INC
         EXPLANATION
*-•••—-  Af>r>Ma»u*Tt txiiui or nic vtc* AH* SIUDY AHCA
PMKO  PUCNTO RICO llDuSIOIM. OC^tlOPUtlll COUP AH T
   SCALE
0        10 000
  MAP OF PUERTO RICO
    AND STUDY AREA
catax ccMCftAi citcimc PROOUCIS. »
-------
                                                                                                   Q OOUn 1CAQ4 4

                                                                                                 Q      Q m»u KMM 6
                                                                                               127          lag
                                                                                               MWAOO KM* 3 .
-25SV


ei HOSW
DM
^
ILLINOIS i i 2
\ e« (
*
QLDS fucira:
6
\ r«EST>L
?4
KAWJO.
ICNZALCJ
ijo CRAMAJ tw:
A e '•«


O«OHLLA;
B*i4 IM


GiiAHAI LINDAS
1 • @H8
                                                                                                               HAGUATO «

-------

N
"* 1/l/tS
K*C I'.XMT

Utt. «C4:
e»f.
WP I.
f™ "» IIMJ
W" Vt/tl
PRtOCO INDUSTRIAL PAI,
VEGA ALTA, PUERTO Id.
UNISYS
f-

-------
RESIDENTIAL AREA
                                TOTM.-
                                 M SOL-OA3 BuCLfO LOCATIONa
                                AT T>e pnoco roumvu. ^A« A«CA

-------
   OUlt BOnCHCXE
   eORIMC CONVERTED TO MONITORING WELL
   TRIO IL OR OE THEME
   TElflACHLDROerHENE
   TCE/PCE CONCENTRATIONS IN PARTS PE» SllLION
   oct/urnr UNIT iwo
   CURRENT DRAINAGE DITCH
   rofiufn oRAiHACC CHTCH
10/PIU ^^-w  1H/IO
                                                                           RESIDENTIAL   AREA
                                                                                      HIGHWAY
                              ; vc rtcunt 4-t «n> Mnc <-« COR otphis IH»T comcirao to ICC/PCI
uuuu TCE wo PCE eocsoiwnaa Hn cct.
        HOJ au i KTB aft 
-------
                             WHO* CHECK
RESIDENTIAL  AREA

       HIGHWAY " 2
                      = GEOPHYSICAL SURVEY AREAS

-------
I\___RESID£NTIAL AREA

-------
                                        7///77J77T/.
                                       ATLANTIC OCEAN
                                               UDOKDltUI^H OMMS vtKt DU'.
                                               Wt» BIT Cl 0*U fTOl mllfHT
                                               «o nat ICKTOIW; VOLJ on w> aa.
GERAGHTY

 MILLER,  INC.

-------
                                                '1000
                      /3000
                PARKING LOT
                PAVE/WENT
                                 GE

                             CONTROL
                               PLANT
                              0
                                        SCALE
                                                        220
                                                        FEET
                              EXPLANATION!
    o
  *""S

  TCE

PRIOCO
             MULTIPORT MONITORING WELL
              4-iNCH DIAMETER WELL

             TRiCHLOROETHENE

             PUERTO  RICO INDUSTRIAL
             DEVELOPMENT COMPANY
• BOO
CONCENTRATIONS OF TCE
IN  PASTS PER 8ILLION

UN£ OF EQUAL TCE CONCENTRATION
(DASHED WHERE LESS CERTAIN)
' GERACHTT
& MILLER, INC.
              HCHEST QUANT1RABLE TC£ CONCS^TTUTO.^ m CROJNOWATER
           EASTERN SDE OF THE PRffiCQ WDUSTolAL PAfX. AUGUST TO SEFTEMBEa 1990
                                                                       fig-
                                                                        9


                                                                        •%••••«

-------
             TABLES
VEGA ALTA PUBLIC SUPPLY WELLS SITE
     VEGA ALTA, PUERTO RICO

           APPENDIX B

-------
                                                                        Page 1 of 4
Table 1     Chronology of Events (June 1983 to March 1993), Vega Alta, Puerto Rico.
Date
Description of Event(s)
June 1983
 September 1983
 March 1984
The U.S. Geological Survey (USGS) discovered volatile organic
compounds (VOCs) in a groundwater sample from the Ponderosa
water-supply well located south of the municipal landfill.


The U.S. Environmental Protection Agency (USEPA) Technical
Assistance Team (TAT) (Roy F/Weston, Inc.) collected and
analyzed samples from the public water distribution system and
supply weils on a monthly basis.
 April 1984 -
 March  1985
 NUS Corporation, under contract to the USEPA, conducted RI
 field work at the Vega Alta Site.
 May 1986

 July 1987
 NUS Corporation issued the RI Report.


 Draft Feasibility Study Report prepared by NUS was submitted to
 the USEPA.                               •  '  •   .
 September 1987
 The USEPA issued a Record of Decision (ROD) selecting a
 remedial alternative for remediation of groundwater and provision
 of drinking water supply for Vega Alta.  The ROD required the
 construction of treatment systems at four public supply wells, the
 pumpage and treatment of groundwater, and the reintroduction of
 treated Water into the public distribution system.
  1988
  The USGS published a report entitled "Hydrology and Effects of
  Development on the Water Table Aquifer in the Vega Alta
  Quadrangle, Puerto Rico."

-------
                                                                       Page 2 of 4
Table 1    Chronology of Events (June 1983 to March 1993), Vega Alta, Puerto Rico.
Date
Description of Event(s)
1988
The USEPA invited several companies, including General Electric
(GE), Harman, Motorola, West Company, and the Puerto Rico
Industrial Development Company (PR1DCO) to implement the
selected ROD remedy.
September 1988
Caribe GE, Inc. retained Bechtel Environmental, Inc. to evaluate
data from the Vega Alta Superfund Site.
March 1989
 In response to concerns expressed by'the above companies and
 with input from the Puerto Rico Environmental Quality Board
 (PREQB) and the Puerto Rico Aqueduct and Sewer Authority
 (PRASA), the ROD was modified to require surface discharge of
 all treated water.  The USEPA issued an Administrative Order
 (Index No. II-CERCLA-90302) which ordered the above
 companies to implement the modified ROD remedy.
 May 1989
 Caribe GE submitted a Groundwater Investigation Work Plan.
 prepared by Bechtel to the USEPA.               - '  '  '
 1989
 Ebnsco prepared and submitted work pians to the USEPA 'for
 Operable Unit Two (OU II) (Source) and Supplemental
 Groundwater Investigations (SGI).
 July 1989 -
 February 1990
 Bechtel conducted field activities (soil-gas survey, geophysical
 survey, surface-water sampling, muldport monitoring well
 installations, and well sampling) associated with the groundwater
                       investigation.
 January 1990
 Six potentially responsible parties (PRPs) received a "Special
 Notice Letter" from the USEPA that extended the opportunity to
 conduct the work proposed in Ebasco's Remedial
 Investigation/Feasibility Study (RI/FS) Work Plan.

-------
                                                                        Page 3 of 4
 Table 1    Chronology of Events (June 1983 to March 1993), Vega Alta, Puerto Rico.
 Date
Description of Event(s)
 .February 1990
Bechtel submitted a Technical Memorandum to the USEPA
summarizing the results of the groundwater investigation.
  September 1990
The USEPA issued an Administrative Order (Index II-CERCLA-
00301) and a final work plan for OU II (source) and supplemental
groundwater investigations at the Vega Alta Site.
-  November 1990
 Caribe GE submitted Bechtel's Groundwater Investigation Report
 (Bechtel 1990) to the USEPA, USGS, and Commonwealth
 agencies in conjunction with a Field Sampling and Analysis Plan
 for OU n.
  November 1991
 Caribe GE submitted Geraghty & Miller's report "Field Sampling
 Plan, Operable Unit Two (Source) and Supplemental Groundwater
 Investigation, Vega Alta, Puerto Rico" (Source) to the USEPA.
   November 1991
 Caribe GE submitted Geraghty & Miller's report "Results of the
 1991 Field Effort, Caribe GE Groundwater Investigation, Vega
 Alta, Puerto Rico"  to the USEPA.
   January -
   April  1992
  Geraghty & Miller implemented Phase I of the OU II RI field
  activities.
   October 1992 -
   March 1993
  Geraghty & Miller implemented Phase R of the OU E RI field
  activities.
   July 1992
  Geraghty & Miller submitted the report "Technical Memorandum,
  Summary of Initial Field Activities for the Operable Unit Two
  Remedial Investigation,- Vega Alta, Puerto Rico" to the USEPA on
  behalf of GE.

-------
                                                                        Page 4 of 4
Table 1    Chronology of Events (June 1983 to March 1993), Vega Alta, Puerto Rico.
Date
Description of Event(s)
 April 1992
Environmental Resources Management, Inc. (ERM) issued a
report entitled "Annual Report of Historical VOC Distribution in
Groundwater  at the Vega Alta Superfund Site".
 March - June 1993     ERM constructed an air stripper and treatment system at the
                      Ponderosa Well in compliance with the OU I.
 March 1993 -
 January 1994
Geraghty & Miller implemented Phase II and Phase III of the
OU II RI and SGI field activities.
PRCOM.OOJ

-------
Tiblc   1.
                                                        ,V«T ., Ae PRIDCO
                                                                                    . Fcbnurv Through April 1991. OU D tUmeduj
S
id Arei * •
2/20/92
2/20/91
2^0/92
2/20/92
2/10/92
2/20/91
2/10/92
2/10/91
2/20/92
2/20/92
2/30/92
1/20/92 '
2/20/92
2^0/92
2/30/92
2/20/92
2/20/92
2/2Q/9J
2/20/92'
2/20/92
2/20/92

WO/92
2/20/92
WO/92
WO/92
Cooriiiuiei
i

E 10360
N9440
E 103 40
N 9480
E 20160
N9520
E 10360
N9600
E 20400
N 9560
E 10400
N 9480
E 20400
N9440
E 10440
N94JO
E IMiO
N9S10
E 20520
N9520
E 20J20
N9520
E 10520
N9J60
E 20440
N9400
E 10540
N 9600
E 20360
N95&0
E 20400
N9SOO
£ 20400
N9510
E 20440
N944Q
£10440
N9J20
E204M
I* -HO
E 20440
N9J60
E 2C4JO
N9560
E 20520
N 9600
E 20430
N9600
E 20560
N 9160
l.l-DCE
(ppmv)

<0.03
*.
wtUUj,
1 	 • — —
0 n
u
0
u 0
0 A
u 0
0 • />
u 0
0 n
0
0 0
0 6
u
0 o
0 n
« 0
i
0 i
" 1
0 n
v u
0 n
w g
0 n
•f U
• 0 - ft
™ w
0 a
4 . *
0 -n
V 1|
0 o
v y
0 •' 0
0 0
w \f
o • o
v y
• 0 o
v \j
0 o
o a
0 0
0 0

-------
     T«ble  2.
XimpJe
•
A-17
A-18
A-19
A-20
A-2I
A-22
A-23
A-24
A-2S
A*2J*
A-26
A-27
A-23
5-12
B-I2-
B-13
8-14
B-I5
B-16
B-17 .
B-18
B-19
A-29
A-30

A-31
A-32

">• D.I.
	 • 	 • 	 _
Ml/92
Ml/92
Ml/92
Ml/92
Ml/92
MI/92
Ml/92
^ n t JM-*
*/iI/92
Ml/92
Ml/92
Ml/92
MI/92
Ml/92
Ml/92
Ml/92
Ml/92
2421/92
Ml/92
Ml/92
Ml/92
WlrtM
**-l/V*
Ml/92
M4/92
M4/92

M4/92

M4/92
Caon£«tu
111
E 20480
N9440
E 20520
N 9440
E 20560
N9520
E 20560
N94CO
E 206 00
N9400
£20600
N9520
E2«00
N 9480
E 20600
N9440
£20100
N9520
E 20100 .
N9520
E 20760
N 9400
E 20840
N9S60
E 20340
N9S20
E 20520
N94SO
E 20520
N94JO
£ 20560
N9430
£ 20560
N9440
E 106 40
N94SO
E 20300
N94M
£20760
N94SO
E 207«
N9440
E 20300
N95«0
£20640
NS400
ElGrfJSI
AV^J^U
N9440
E 206JO
N9400
E 20630
N952Q
1,1-DCE
(ppmv)
—
<0,03
<0.08
<0.08

-------
T*ble  2.
of ] [
                           f AMlyUed Rcfl.lt. for ihc So,l-G..
Sample
«^^^^_B_
A-33
A-33-
A-14
A-35
A-36
A-37
A-31
A-39
A-W
A-4I
A-»2
B-10
•- B-io-
B-U
B-12
B-23
B-24
B-1S
B-26
B-27
B-2S
B-29
B-30
B-30-

B-31
-— ^— — .
See li« pjg.
1-0. Dl(e
• 	 : 	 ' 	 .
2/24/92
2/24/92
2/14/91
1/24/92
2/24/92
1/34/92
2/24/91
2/24/92
1/24/91
2/24/92
2/24/92
1/24/92
2/24/91
2/14/92
2/24/91
2/24/92
1/24/92
2/24/92
2/24/92
2/24/92
2/24/92
2/24/92
2/24/92
1/24/92

2/24/92
	 — 	
: for ibotnotei.
Coordiniiei
.-
E 20760
N9J20
E 20760
N9520
E 20720
N9400
E 10630
N 9560
E Z0640
N9600
E 10800
N9600
E 10110
K9400
E 20600
N9600
E20SOO
N 9440
E 20710
N94SO
E 10710
N9520
E 10640
N 9520
E 20640
N 9510
E206JQ
N9440
E 10610
N94JO
E 20760
N9J60
E 20710
N9-UO
E 10610
NMOO
E 20740
N 9«00
E 20340
N9600
E 10920
N9600
E 20330
N 9560
E 10770
N9450
E 20770

H9«0
E 10710
N 9560
" -^-^^^^—.^
t.l-DCE
(ppmv) -
...
<0.03
<0.03
<0.03
<0.03
<0.03

-------
T.ble  2.        Sumnurr of A«lv.«.I Jfc*lu tor the SotI-C« S««v=y .1 (he PRIDCO lnd««ri.l P.rk. Febrwrv
                 Uvcilif iiion, Vegt AItt, Pwrw fcieo.
                                                                                                       April 1991.
Simple I.D. D«le CoonftntKi
A-O

A-U*

A-W

B-32

B-33
B-34

B-34*

B-J5

Honrf* Creek
A-l

A-2

A-3

4-45

A-46

A-t7

A-«

A-49

A-JO

A-51

A-52

A-53

B-36

B-37

8-33

A-J-t

2/25/92

2/15/92

2/25/92

2/25/91

205/92
2/25/92

2/25/92

2/15/92


2/19/92

2/19/92

2/19/92

2/15/92

2/25/92

2/25/92

2/25/92

2/35/92

2/25/92

2/25/92

2/Z5/92

2/25/92

2/15/92

2/15/92

2/25/92

l/M/92

£20600
N9560
£20600
N 9560
E 20620
N 9540
E 20640
N9560
E 20720
£20600
N954Q
£20600
N 9540
£10550
N 9540

E 20000
N IOSOO
£20040
N 10800
E 19960
N 10800
E J9680
N 1071 1
E 19710
N J0771
E 19760
N 10757
£ 19S40
N 10808
E 19830
N 10S23
E 19760
N 10720
E I9S40
• N 107M
E 19JSO
N 107SO
E 19100
N 10760
E 19430
N 10630
£ 1972Q
N IQ6SO
E [9300
N 107S7
E 19910
N 10U3
1,1-DCE tnn*-l,2-OCE
(ppmv) (ppmv)

-------
Tlblc   1.
Strnplc I.D.
~~'
A-55
A-55*
A-57
A-58
A-J9
A-*0
A-61
A-4Z
A-63
A-6,4
A -65
i jee*
^XIJ
A-66
A-47
A-«3
A -59
A-70

A-71
A^^
-71
A-73'
A-74
A-75
A-75-
A-76
A-77
A-73
A-79
— .
in Utteige for
DILC
1 	 • 	
2/26/$2
2/2S/92
2/26/92
.2/24/92
2/26/92
2/16/92
2/26/91
2/26/92
1/26/92
2/JS/92
1/26/92
2/26/92
2/26/91
2/26/92
2/W/92
2/26/92
1/27/92

2/27/92
2/27/92
2/27/92
2/27/92
2/27/92
2/17/92
2/27/92
2/27/91
1/27/92
2/27/91
" 	 —
foatn/if *•«
Coordtiuiei
	 — 	
E 19920
N I 0100
E 19920
N 10800
E 19960
N 10845
E 20040
N IOS5J
E 20000
N 108JO
E 20080
N IOS45
E 20120
N 10831
E 20160
N 10S20
E 10030
N 10800
E 20120
N 10300
E 20160
N IOSCQ
E 20160
N 10800
E 20200
N 10817
E 10200
N 10800
E 20240
N 10300
E 20240
N 10827
E 20320
N IOS21
E 20320
N 108CO
E 203 40
N IOS41
E 10360
N 10800
E 20400
N 10867
£20440
N 10895
E 20440
N IOS95
E 10520
N 10931
E 20560
N 10920
E 206.10
N 10947
E 20400
N 109:0

1,1-DCE
(ppmv)
— ^^— — ^— ^

-------
Tibl« 1.
Sumnurv nf






Pije t qf j|
• — * — ---i/HsimMMBiiof (Be 5«l-O*f 5UIV4V « the PRmco l.i, i • i B u r- •.
InvcBj^^n. Vcj, AK., *«« j^o. • ° tndl"""' Plflc- **«* ™™th April 1992. OU B fe^,
Simple I.D.
— " i—
A-80
A-H
A-S1
A-S3
A-S4
B-39
B-tO
B-40*
B-tl
B-tl
B-43
B-44
V45
3-46
B-t7
B-48
B-19
B-50
B-50*
8-51
B-52
A-222
C-94
Caribs GE Pirt;nT t
A-85
A-35*
— 	 	 —
Scs bji nice fn, .-„„,
Due
_
2/27/91
1/27/92
2/27/92
.2/27/92
.2/27/92
2/27/92
2/27/92
2/27/92
2/27/91
1/17/92
2/27/S2
2/27/92
2/27/92
2/27/92
1/27/92
2/27/92
1/27/92
2/27/92
2/27/92
2/2S/92
2/2S/9!
3/20/92;
3/20/92
jOt
2^3/92
1CS/91
•

CoonJuutct
"•^ ~^w^KHH^_h
E2C630
N 10945
. E 20610
N 10920
E 20720
N 10950
E 10760
N 10951
E 20800
.N 10920
E 20210
N 1 0800
E 20320
N 10830
E 10320
N 10310
E 20400
N 10140
E 20440
N 10140
E 10410
N 10110
E 20430
N 10910
E 20520
N 10810
E 20600
N 10945
E 20640
N 10920
E 20560
N 10945
E 20720
N 10920
E 20760
N 10920
E 20760
N 10920
E 20100
N 10960
E 10140
N 10920
E 20840
N 10940
E 10340
N 1OT35
E 19710
N 10200
E 19720
N 10200

I.I-DCE
(ppmv)
<0.|4

-------
T.ble 2.
.
Jtmpk I.D.
.
A-86
A-87
A-88
A-89
A-90
A-91
B-J3
B-54
B-J5
B-34
B-57
fl-53
1-59
A-9:
A-93
A-94
A-95
A-95* .
A-94
A-97
AOfl
-?B
A-99
A-LOO
A-IOl
A-102
Sumnury ol
Invettigiuoi
	 —
One
	 -i
2/28/92

2/21/92
i/M/92
2/28/92
2/21/92
2/2J/92
2/28/92
2/2S/92
2/28/92
2/21/92
2/21/92
2/2S/92
2/2S/92
3/2/92
3/2/92
3/2/92
3/2/92
3/2/92
3/2/92
3/2/92
3/2/92 •
3/2/92
3/2792
3/2/92
3/2/92
' Anilviiej] Rea,Iu
i. V«n AJU, Pwcl
Coord 141* 1*1
.
E 19760
N 10140
E 19740
N 10120
E 19J40
N 10200
E 19940
N 10200
E 19920
N 102+0
E 19140
N 10240
E 19680
N 10200
E 19800
tt JOI40
E 19100
N 10200
E 19740
N 10200
E I9J30
N 10200
E 19920
N 10200
E I98SO
N 10240
E 19720
N 10140
E 19800
N 10120
E 19140
N 10160
E 19440
N 10120
E 19440
N 10120
E 19710
N 102*:
E 19740
N 10240
E 19440
N 10010
E [9340
N 100SO
E I9KO
N 10030
E 19920
N 10030
E 19920
N 10120
for th« 5oi[-G»j
a RJca.
1.1-OCE
(ppmv)
— ^ — ^_
rt. F:bra«f
—• -
TCE
(ppmv)
—
<0.04
<0.04
•« 0 0

-------
T*ble  2.
                                                                                                   p>3-- 8 of j]

of Aiulyuctl Retulu for uie Soil-Go Survey it the PRIDCO [nduuriij  Pirk. Fcbnury Through April 1991. OU Q Reni*H'
  . Vtj« AJu, Pu.rto fcico.                     •                                                              '

Simple l.D.
B*50

B-«0«

8-61

B-61

B-63

B-44

B-6J

B-67

A-I03

A- 104

A- 10 J

A-105*

3-49

3-70

B-70*

A-2S4

A-2SS

A-236.

A-2S7

A-237*

C-II7

C-118

C-119

C-120

C-120-

C-121


Dtie
3/2/92

3/3/91

3/2/92

3/2/92

3/2/92

3/2/92

3/1/92

3/2/92

3/3/92

3/3/92

3/3/V2

3/3/92

3/3/92

30/92

3/3/92

3(10/92

3/30/92

3/30/91

3/30/92

3/30/91

3/30/92

3/30/92

3/30/92

3/30/91

3/30/92

3/30/92


Coordiiuiu
£ 19680
N 10160
£ 19680
N 10160
E 19720
N 10120
£ 19680
N 10120
E 19640
N 10160
E 19630
N 10140
E 19800
N 10240
E 19960
N 10030
E 20000
N 10240
E 20000
N 10120
E ZOOCO
N 100SO
E 20000
N 10080
E 20000
N 10200
E 20000
tt 10160
E 20000
N 10160
E 19960
N 10230
E 19920
N 10230
E 19340
N 10230
E 19720
N 10110
• E 19710
N 101SO
E 20000
N 102SO
£ 19S30
N 10230
E 19300
N 10230
E 19760
N 10230
E 19760
N 10230
E 19630
N 10230

1,1-DCE
(ppmv)

-------
PjJtSofJl
Tible 2. Sumnury of AjulyiiciJ RcwlLi for the Sail-Gn Survey  Unknown.
0.43 |

0.06 j

0 1

0.33 1

0.04 o

2.9< o

1.43 o

0 I

0 0 .

OJ4 0

0.11 0

OJO 0

1.09 0

(Ul 0

0 0

Cinb«GE Pilot Bld». No. 1.
A-1W

A- 107

A- [OS

A-109

A-na

fl-71

B-72
V
B-73

B-74

3/3/92

3/3/92

3/3/92

3/3/92

3/3/92

3/3/92

3/3/92

3/3/92

3/3/92

E 19920
N 100-W
E 19340
N 10040
£ 19760
N 10040
E 19730
N 10000
E 19640
N WO
E 20000
N 10040
E 19960
N 10040
E 19SSO
N 10040
E 19SOO
N 10040

-------
Tihle  I.
           Summary of Aiul/tici! ReiuJu for the Soil-Gil Survey n she PRIDCQ tnduiiriil Piri, Fsbruiry Through April 1992. OU D
                       Vegi Aiu, Puerto Rico.
Simple 1.0.
8-75

B-76

B-77

fl-78

B-79

B-tO

B-80*

Mil

A-it:

B-81

MI

6-33

v.|21

A- 111

B-93

8-94

B-95

Ciribe CE Pilot
A-I13

A-H4

. A-115

B-S4

B-85

B-S6

B-S7

Due
•i •
3/3/92

3/3/92

3d/92

3/3/92

3/3/92

3/3/92

3/3/92

3/4/92

3/4/92

3/4/92

3/4/92

3/4V92

3/5/92

3/5/92

3/5/91

3/5/91

3/5/91

eid», No^l
3/31-91

3/3/91

3/3/91

3/4/91

3/4,'92

3/4/91

3/4/92

Coordijuie*
E 19800
N 10000
E 19340
N 10000
E 19720
N 10040
E 19680
N 10040
E 19640
N 10000
E 19640
N9920
E 19640
N99JO
E 19920
N 10000
E 19920
N9960
E 19960
N 10000
E 19680
N 10000
E 19760
K 9830
E 19960
N 9880
. E 10000 .
N 9920
E 199(0
N 9340
E 20000
N 9830
E 20000
N 9960
'
E 19760
N 9140
E 19140
N9SCO
E 19S40
N 9680
E 19*00
N 9S40
E 19840
N9840
E 19300
H9760
E 19720
N 9760
l.l-DCE tn'n*-l,2.DCE
(ppmv) (ppmv)
<0.14


-------
 Tibia   I.
                                                                                                                , ,9,1.
Simple I.D.
S-8J
B-S9
A-116
A-116*
A-117
A-IIS
A-119
A- 120
B-90
B-90-
B-91
B-92
A-I34
A-135
C-J
C-9
C-9-
Rovimk
A- 123
A-114
B-96
B-97
A-125
A-12J-
A-126
Oite
3/4/92
3/4/92
3/5/92
3/5/92
3/5/91
3/5/92
3/5/92
3/S/92
3/5/92
3/5/92
3/5/92
3/5/91
3/9/91
3/9/92
3/9/91
3^/91
3/9/92

3/5/92
3/5/91
3/J/91
3/5/92
3/6/92
3/6/92
3/4/92
CoonJtuici
E [9710
N9630
E 19710
N 94 80
E 19800
N9480
E 19800
N9480
E 198CO
N9720
E 19920
N 9630
E 19960
N9760
E 19960
N9720
E 19880
N 9610
E 19110
N 9610
E 19920
N 9720
E 19960
N 9SOQ
E 19300
N9SOO
E 19760
N9760
E 19760
N 9SOO
E 19720
N9720
E 19730
N9720

E 19630
N 9380
E 19600
N 9900
E 19740
N9840
E 19640
N93SO
E 19400
N 9330
E I96CO
N 9330
E 19560
N 9300
I.I-DCE
(ppmv)
<0.24
• <0.24
0.41
0.42
3.04
<0.10
<0.10

-------
Ttble   2.
                Sumnury of An*l]rtic»| Rcmju for the Soil-Gn Survey 11 (he PRIDCO InJunri.) P»rlc. Febnury Through April 1991, OU D Rsmedi.1
                  va, VCg» AJu. Puerto Rico.

Simple l.D.
A-127

A-m

A-119

A-L3Q

A-I3I

A-132

A-133

C-l

C-2

C-3

C-t

C-5

C-6
Drjfrjp Ditch
A-136

A-136*

A-137 .

A-I3S

A- 139

A-140

A-141

A-142

A- 1 43

C-IO

C-ll

C-ll


Dtte
3/6/92
"*
3/6/92

3/4/92

3/6/92

3/6/92

3/6/92

3W/92

3/4/92

3/6/92

3/4/92

3/6/92

3/6/92

3/9/92

3/9/92

3/9/92

3/9f92

3/9/92

3(9/92

3/9/92

3/9/92

3/9«2

3/9/92

3/9/92

3/9/92

3/9/92


Coordiruui
E 19600
N 9900
E 19520
N9720
E I9J20
N 9610
E 19480
N 9640
E 19520
N 9640
E 19560
N 9600
E 19600
N 9640
E 19600
N9S40
E 19560
N9760
E 19560
N9720
E 19560
N 9640
E 19640
N 9600
E I960)
N 9600
E 20920
N 10130
E 20910
N 10180
E 20910
N 104CO
E 20920
N 104SO
E 20920
N 10560
E 20920
N 10640
E 20920
N 10720
E 20902
N 10300
E 20S75
N iosao
E 20920
N 10360
E 2C910 •
N 10360
E 20920
N 10440

l.t-DCE
(ppmv)
<0.10


-------
Title 2.
Summary a( Antlyiie.1 ftuulu tot ihe SoiI-G« Survey n (he PR1DCO InJuiuiil Pirk
Invetugition, Vigt Afti. Puerto Rico.
1,1-DCE tniu-l,2-DCE eii-l,2-DCE
Simple 1.0.
C-13

C-I4

c-ii

C-1S

c-n

C-H

former Drain»te
A-270
A-271
. A-272
A-273
A-274
-1-27J
A-276
D-20
D-21
D-22
'D-23
D-24
D-li
D-26
A-277
A-177-
A-273
A-279
A-230
Due Coordiiuici
3/9/92

3/9/91

3/9/92

. 3/9/92

3/9/92

3/20/92

Drteh
3/27/92
3/27/92
3/27/92
3/27/92
3/27/92
3/27/92
3/27/92
3/27/92
3/27/92
3/27/92
3/27/92
3/27/92
3/27/92
3/17/92
3/30/92
3/30/92
3/30/92
3/30/92
' - 3/30/92
E 20920
N 10320
E 20920
N 10600
E 20920
N 10630
E 20914
N 10760
E20S92
N 10840
E 20823
N 10920

1"
220
2IJ
214
211
' 110
222
213
219
214.
213
212
209
221
223
223
207
1«
205
fppmv)
^0.11

<0. 1 1

<0.tl

<0.11

<0-ll

<0.16


<0.10
)
<0.04

<0.04

<0,04

<0.04

<0.04

<0.08


<0.06
<0.06

-------
7.
             Sunurury of Aiulvtieil Reailu for the Soil-G«« Survey »t ihe PRIDCO Iiufuiirwl P»rk. February Through April 1992, OU n Remedial
                         , Veji AIu. Puerto Rico.
Sttnfte I.D.
A -IS!
A-232
A-2S3
C-tll
C-112
C-113
C-114
C-IIJ
C-tlS
Formerly West Q
A-144

A-14J

A-146

A-146-

A-147

A-143

A-I49

A-IiO

C-13

C-19

C-19*

C-20

C-21

C-22

c-13

C-24

D*ie Coordiiutci
3/30/92
3/30/92
3/30/92
3/30/92
3/30/92
3/30/92
3/30/92
3/30/92
3/30/92

3/10/92

3/10/92

3/10/92

3/10/92

3/10/92

3/10/92

3/10/92

3/10/92

3/10/92

3/10/92

3/10/92

3/10/92

3/10/92

3/10/92

3/10/92

3/10/92

104
201
22S
224
208
22i
203
202
227

£20040
N 10240
E 20080
N 10240
£ 20120
N 10200
E 20120
N 10200
E 20240
N 10240
E 20240
N 10200
E202JO
N 10200
E 20240
N 10260
£20040
N 10200
E200W
N 10200
E 20010
N 10200
E 20020
N 10240
E 20160
N 10240
£20200
N 10240
E 20160
N 10200
E 20200
N 10:00
l.l-DCE tnu-(,2.DC£
(ppmv) (ppmv)
<0.10
<0.10 '
<0.10


<0.08

<0.16

<0.16

<0.16

^O.ltf

^O.t6

<0,Q3

<0.1S

<0.lfl

TCE
<0.04
<0.04
<0.04
<0.0fi
<0.06.
<0.06

-------
                                    ,, puetto *„.
                                                          ,urvey „ A. PWDCO
                                                                                    d P,,t.
                                                                                                           April 1991. OU a
Simple 1,0.
C-2J
C-26
C-27
C-23
C-29
A-IJ1
A-IJ2
A-1J3
A-154
A-U5
A-156
A-U7
\-U7-
A-1JJ
A- 159
COO
COO-
CO I
C01
C03
CO4
coi
cos
C07

A-160
^ -^— ^
Ditc
	
3/10/91
3/10/92
3/10/92
3/10/92
3/10/92
3/11/92
3/11/92
3/11/92
3/11/92
3/11/92
3/11/92
3/1 1/92
3/11/91
3/11/91
3/11/92
3/11/92
3/11/92
3/11/92
3/11/92
3/1 1/92
-3/11/92
3/1 1/92
3/11/92
3/11/91

3/12/92
•^^^^^—
Coordiiutei
•^— ^^^— ^— •— ™^— ^—
£ 20140
N 10180
E202SO
N 10240
E 10320
" N 10200
E 10310
N 10140
E 10310
N 10160
E 10140
N 10131
E 10160
N 10160
E 20160
N 10110
E 20240
N 10233
E 20360
N 10200
£20360
H 10120
E 20310
N 10120
E 10320
N 10120
E 20320
N 10061
E 20140
N 10063
E 20100
N 10160
E 10200
N 10160
£10200
• N 10240
E 20240
N 10220
E 10340
N 10230
E1034J
N 10160
£ 20340
N 10030
E 20310
N 10030
E 20230
N 10065
E 20200
N 10063
1,1-DCE
(ppmv)
- <0.17
O.SO
<0.17

-------
                                                                                                                               f'tt IS of]

Tible   I,         Suenmiry of Aiulyiicil Reiuiu Cor the Soil-C«l Survey «
-------
T*bk   2.
                Sunurury of An»lylkil RcwlU far Ae Soil-Go Survey 11 (lie PRIDCO InJuuri.1 Put, Februtry Through April 1991, OU Q Remedial
                bvtejjiiioa, Vcgi AJu, Puerto Rico.
Simple I.D.
A-171

A-172

A- 173

A- 174

A- 173

A-176

A-176-

A-177

A-17S

A- 179

A- ISO

A- 133

:-«»

C-t9

c-so

c-5o-

C-31

C-J2

C-53

C-54

A-1S4

A-185

A-1SS

A-13S-

A-1J7

A-ISS

D«i*
3/13/92

3/13/92
•
3/13/92

3/13/92

3/13/92

3/13/92

3/13/92

3/13/92

3/13/92

3/13/92'

3/13/92

3/13/92

3/13/92

3/13/92

3/13/92

3/13/92

3/13/92

3/13/92

3/13/92

3/13/91

3/16/92

3/lfi"fl2

3/16/92

3/16/92

3/14/92

3/la/92

CoopdiiuLCJ
E 20400
N 10240
E 20440
N 10240
E 1Q560
N 10140
£20640
N 10240
E 20680
N 10240
E 20720
N 10240
E 20720
N 10240
£ 10840
N 10240
E20SOO
N 10200
E 20740
N 10240
E 20960
H IOOJO
E 10920
N 10160
E 20520
N 10240
E 20480
N 10240
E 204CO
N 10240
E 20600
N 102*0
£20440
N 10200
E10S10
N 10240
E 20920
N 10240
E 20140
N I02IX)
E2Q92*.
N 10200
E20S40
N 10160
£20*40
N 10120
E 20340
N 10120
E 20960
N 10000
E 20360
N 1C040
I.I-DCE
(ppmv)
<0.16

<0.16


-------
 Tbl*  7
         '
' KXXSSL'K Saiw:" *"*" " *• PRroco """""" Plfk- F""^ n™* *« ««• °u • «-*•
Simple I.D.
C-56
C-57
C-59
C-60 .
C-60*
C-W
A-212
A-213
A-215
A-21S
A-219
C-85
:-M
C-J7
C-S8
C-S9
C-91
C-92
A-220
A-221
A-227
A-22S
A-229
C-97
C-9S
C-99
Due
-r •
3/16/92
3/16/92
3/16/92
3/16/92
3/16/92
3/lJ#2
3/19/91
3/19/92
S/19/92
3/19/92
3/19/92
3/19/92
3/19/92
3/19/92
3/19/92
3/19/92
3/19/92
3/19/92
3/20/92
3/20/92 "
3/23/92
3/23/92
3/23/92
3/23/92
3/23/92
3/23,92
Coordinate*
E 20920
N 10120
E 20980
N 10080
E 20960
N 10040
E 20»0
N 10000
E'20S»0
N 10000
E 20560
N 10000
E 10640
N 10000
E 20560
N IOOEO
E 20720
N 10020
E 20760
NIOOOO
E 20800
N 10000
E 20600
N ICOCO
E 20520
N 1004)
E 20520
N 10030
E 20*80
N 10000
E 20720
N 100CO
E 20720
N 10040
E 20760
N 10040
E 20100
N 10040
E 20100
N 10020
E206SO
N 10040
E 20160
N 10040
E20S2J
N 10000
E 20760
N 10020
E 20440
N 1C040
E2«00
N 10040
U-DCE
(ppmv)
<0.09

-------
                                                                                                                       H of 3 1
T»ble '2.        Summiryof AjulpjeJ R«utu for ilw Soit-G" S"™* *llhe PFUDCO Uluurul Ptrk. Febnury Through April 1992, OU
                [flveaijuion, Vegt All*. Puerto Rica,
Simple t.D.
C-100

C-100-

We* Company Ko. '
A-L8I

A-U1

C-H

A-139

A-190

A- 19 1
•
A- 192

A-193

C-6!

:-62

C-63

C-64

C-6J

A-194

A-19J

A- 196

A-196'

A- 197

A- 193

A- 199

A-100

A-201
•
Diu Coordirtfic*
3/23/92

3/23/92


3/13/92

3/13/92

3/IJ/92

3/16/92

3/16/92

3/16/92

3/16/92

3/16/91

3/16/92

3/16/92

3/16/92

3/16/92

3/16/92

3/17/92

3/17/92

3/17/92

3/17/92

3/17/92

3/17/92

3/17/92

3/17/92

3/17/92

E 20823 .
N 10040
E 20323
N 10040

E 20910
N 9310
EllOOO
N 9920
E 10920
N9840
E 20960
N 9920
E 20880
N9SOO
E 20840
N 9330
E 20840
N 9340
E 20340
N 9760
E 20960
N 9960
E 20310
N 9840
E 20920
N9300
E 20830
N98SO
E 20840
N9SCO
E 20960
N 9300
E 20960
N 9720
E 20920
N 9720
E 10920
N 9730
E 20920
N 9640
E 20330
N 9640
E 20340
N 9630
E 20300
N 9640
E 20720
N 9640
1,1-DCE tnn»-l,2-DCE «it-l,2-DCE
(ppmv) (ppmv) (ppmv)
<0,17

<0.17



-------
Tible  2.
Somnury of Aiuljaicil Rewtu for the Soil-Co Survey n ihe PRIDCO Indujirijl Pirk. Fcbnury Through Apri
Inveaigiliaa, Vegi All*. Puerto Rico.
                                                                                                         April 1992.
Simple LLD.
• ••! 1..—
A-202
A-203
A-204
A-205
C-66
C-47
C-68
C-S9
C-70
C-70*
C-71
C-72
C-73
C-74
C-73
C-76
A-206
A-206-
A-207

A-20S
A-209
A-210
A-211
C-77
C-73
C-79
V** 1--. _ _
Dtte
3/17/92
3/17/92
3/17/92
3/17/92
3/17/92
3/17/92
3/17/92
3/17/92
, 3/17/92
3/17/92
3/17/92
3/17/92
3/17/92
3/17/92
3/17/92
3/17/92
3/1S/92
3/18/92
3/15/92

3/13/92
• 3/18/92
3/18/92
3/18/92
3/1 S/92
3/13/92
3/1 S/92
— •
•
CoordLuLsi
E2M40
N 9680
E 20600
NW40
E 20560
N9680
E 20560
N9720
E 20960
N97SO
E 20920
N9760
£20880
N 9760
E 20960
N 9tiiO
E 20SSO
N9SSO
E 20880
NS680
E 20(40
N9640
E 20100
N9680
E 20680
N 9640
E2C640
N9640
. E 20540 -
N9640
E 20520
N96SO
E 20J20
N 98CO
E 20520
N 9800
' E 20520-.
N9760
E 20529 '
N9620
E 20560
N9SSO
E 20520
N 9920
E 20520
N9960
E 20520
N9840
E 20550
N 9840
E 20550 .
N 9300

1,1-DCE
(ppmv)
• ..—
<0.10
<0.10
<0.10 .
<0.10
<0.14
<0.14

-------
Tibl« 2,

Simple t.D.
C-iO

c-»o*

C-81

C-82

. C-M

A-2I4

A-216

A-217

A-217*

C-90

C-W

A-223

A-224

A-225

C-95

C-96

A-22S

A-225'

Eni.Cerr. .1
A-297

A-297*

A-29S

A-299

A-3CO

A-301

Pj«< 21 ofl|
Summiry of Anilpieil Rtnilu for the Soii-Cii Survey tt tfw PREDCO InduMml Pirk. Ftbruiry Through April 1992. OU n Rum,};,,
lnv
-------
 Tible  1.
                                                                 PWDCo
Simple I.D.
A-3Q2
A-303
C-I30
C-130*
C-I31
C-132
C-I33
C-134
Hinrun Auto
A-230
A-231
A-132
A-233
A-234
A-233
A-236
C-lOi

'C-102

C-103
C-104
C-10S
A-237
A-237-
A-233
A-239
— ^^••^
•~~fc^— •— -~^-™«
Dili
4/1/92
t/1/92
4/1/92
4/1/91
4/1 m
4/1/92
4/1/91
4/1/92

3/13/92
3/23/92
3/23/92
3/23/92
3/23/92
3/23/92
3/23/92
3/23/92

3/23/92

3/23/92
3/23/92
3/13/92
3/24/92
3/24/92
3/24/92
3/24/92
Coord ioiut
E 23940
N9600
E 23980
N 9600
E 23860
N9698
E 23860
N9698
E 23900
N9720
E239SO
N 9709
E 24020
N 9600
E 24020
N9680

£20480
N 9680
620430
N 9760
E 10480
N 9840
E 20480
N9800
E 20440
N 9760
E 20440
N96SQ
E 20400
N9720
E 20480
N 9710
E 20440
N 9340
E 20440
N 9800
E 20440
N 9720
E 20*40
N 9«30
E 20430
N 9920
E 20430
N 9920
E 20440
M9330
E 20430
N9960

l.l-DCE
(ppmv)

-------
Tiblc 2.


Simple I.D,
A-240

A-241

A-242

A-243

A-144

C-106

C-107

C-108

C-109

C-!IO

C-UO-

A-245

A-246

A-247,

A-247*

A-24!

A-249

A-250

A-251

A-252

A-253

D-l

D-:

D-3

D-4

A-254

Summiry of Ami/tie*! Reiulu for At Soil-Gu Survey 
-------
Table 2.
Simple (.0.
A-U5

A-Jtt

A-2i7

A-153

A-2ig«

A-U9

A-160

A-I61

A-162

A-163

A-264

A-265

0-J

CMS

D-7

D-8

D-9

D-9*

D-tO

D-ll

D-12

D-13

D-14

D-1J

A-266

A-167

PiltltoOl
Sumirury of A/u[vtie«] ReB1u, for the Soil-C.t Survey .1 ihe PR1DCO InJuun.l P,rt. FtSru.rv Thresh April I99"> OU ff ft*«~r ,
liweiugiiian, V(g» Alt*. Puerto R«o. ' ""Wai
Dm
3/16/91

3/16/92

3/16/91

3/16/91

3/26/92

3/26/92

3/26/91

3/26/91

3/26/91

3/26/92

3/16/91

3/16/92

3/26/92

3/16/92

3/26/93

3/26/91

3/26/92

3/26/92

3/26/91

3/26/92

'3/Z6/92

3/26/92

3/26/91

3/26/91

3/27/91

3/27/91

Coatdiium
£103 60
N 9646
E 20310
N 9644
E 10140
N 9644
E 10103
N 9646
E 10103
N 9646
E 10040
-N9646
E 10000
N9720
E 20020
N 9760
E 20120
N 9S40
E 20QSO
N 98(0
E 10110
N 9100
E 20200
N9S40
E 10180
N 9646
E 10100
, N 9646
E 10160
N 9646
E 10080
N 9646
E 10000
N 9630
E200CO
• N 96SO
E 10040
H 972ft
E100M
N 9SOO
E200SO
N 9840
E 20040
N 9840
E 20120
N 9S30
E 10160
N 9840
E 20040
N 9910
E 10030
N 10000
I.I-DCE iraiu-l.l-DCE
(ppmv) (ppmv)
<0.12

<0.11

<0,11

<0.ll

<0.ll

<0.12

<0.11

<0,11


-------
T4bl«  I.       Sumnury of Aiulyiitil Remit! for ih= Soil-Cn Survey n ihe PRIDCO InJuariil Pitk. Febnuiy Through April 1992.
                Inveoiguioa, Veji AJu, Puerto Rico.
Simple l.D.
A-J67*

A-26S

A-269

D-14

o-n

D-18

D-19

D-19*

CE Comrol Pltnl
A-304

A-305

A-306

s-307

A-307-

A-3QS

C-I35

A-309

A-310

AOII

A-312

A-313

A-314

A-3I5

A-316

A-317
_
Din
3/27/92

3/27/92

3/27/92

• 3/27/92

3/27/92

3/27/92

3/27/92

3/27/92


4/1/92

4/1/92

4/1/92

4/1/92

4/1/92

4/1/92

4/1/92

4/2/91

4/2/92

4/2/92

4/1/92

4/2/92

4/2/92

4/2/92

4/2/92

4/2/92

CooidiniCct
E 2CQSO
N ICOOO
£20200
N ICOOO
£20240
N ICOOO
E 200*0
N99SO
E 20040
N93SO
E 20110
N 10000
E 20160
N ICOOO
E 10160
N ICOOO

E 24340
N 92SO
E 24330
N 9210
£24410
N 92SO
E 24460
N9210
E 14460
H9230
E 24100
N92JO
E 24300
N92SO
E 24J30
N 9210
E 24f i.-j
N 92*0
E 24530
N 9360
E 243 80
N9400
E 14530
N9440
E 24610
N 9400
E 24620
N 94SO
E 24620
N 94SO
E 24530
N 9640
1,1-DCE I
(ppmv)
<0.10

<0.10


-------
Simple I.D
                D«l«    CoordiiuiM
U-DCE    UW.-I.I.DCE   M-I.2-OCE    TCE     PTC    _  Toul
'—      *•*      ^     ^    s   XT'
A-318
A-314*
A-319
A-320
C-136
C-137
C-I38
C-I39
C-140
c.un«
*— l^v
C-14I
C-142
A-32I
A-322
A-323
A-324
A-3U
A-Hi
A-327
C-143
C-144
C-145
C-1 46
C-147
c-us
C-U9
	 —
3« <>U 313f tnr
4/1/92
4/2/92
4/2/92
4/2/92
4/2/92
4/2/92
4/2/92
4/2/92
4/2/92
4/2/92
4/2/92
4/2/92
4/3/92
4/3/91
4/3/92
4/3/92
4/3/92
4/3/92
4/3/92
4/3/92
4/3/92
4/3/92 .
4/3/92
4/3/92
4/3/93
4/3 ,'92
— — — 	
)•„. 	
E 24530
N9600
E 24580
N9600
E 24540
N9560
E 14500
N9600
E 24540
N9230
E 24340
N9260
E 24620
N 9360
E 24620
N 9440
E2«iO
N9520
E 24620
N9510
E 2+605
N9600
E 245SO
N9360
E 24540
N9640
E 24540
N96SO
E 24460
N 9640
E2M20
N9640
£ 24380
N9600
E 24] SO
N9WO
E 24300
N9600
E^JCfUV
i-*jiW
N9560
E 24540
N 9SOO
E 24500
N9440
E 24460
N96CO
El I ifA
it^;y
N 9600
E 24340
N 9600
E 24340
N 9640
-^ ^^ .
<0.13
<0.13
42JO
2.75
- -.0.17
«U7
<0,I7
<0.17

-------
T.blc  1.
Simple I.D.
A-32S
A-32S'
A-329
A-330
A-331

A-332
A-333
A-334
A-335
A-336
C-1IO
C-IJO-

C-IJt
C-1J2
C-1J3
C-134

C-li5

C-136

C-1J7
A-364
A-36J

A-366
A-367

A-36S
A-36J-
A-369
ii

Dtte
— ^— - — ~^_ .
4/6/91
4/6/91
4/6/91
4/6/91
4/6/91

4/6/91
• 4/6/92
4/6/92
4/6/92
4/6/91
4/6/91
4/6/91

4/6/91
4/6/92
4/6/91
4/6/91

4/6/92

4/6/92

4/6/91
4/9/91
4/9/91

4/9/91
4/9/91

4/9/92
4/9/92
4/9/92

Coordiniifi
E 24160
N9320
E 14160
N9320
E 14260
N 9440
E 14160
N 9480
E .14160
N 9520
E 14160
N9S60
E 14300
N9640
E 24300
N 9720
E 24260
N 9694
E 14260
N9720
E 24260
N 9210
E 14260
N 92JO
. E 24260
N9360
E 24260
N9400
E 14260
N 9600
E 24300
N 9680
E24UO
N 9630
•£14160
. N 9760
E 14230
N9«40
• E 14140
N.9360
E 24240
N 9400
E 24140
N 9440
E 24300
N 9760
E 24440
N9720
E 24460
N 9710
E WOO
N 9S40

1,1-DCE
(ppmv)
O.SQ
0.65
<0.14
<0.14
<0.t4 '

<0.t4
0.41
<0.1^— v^.^
TCE
(ppmv)
0.61
OJ«
<0.06
<0.06
<0.06

^^^^^^^H^
PCE
(ppmv)
0.17
0.15
<0.04
<0.04

-------

Sumnury o
          . Veg, A)u.
                                                                                                '*"   ** *'
Simple f.D.
. —
A-370

A-371
C-IT7
C-178
C-179
c-iao
C-ISO*

C-1SI
C-lil
C-1S3
C-184

A-372
v-373
A-374
A-375
A-376
A-377
A-373
A-373*
A-379
A-330
A-3S1
C1 • *
•135
C-ISfi
C-187

C-IJ3
•- 	
3« Its -itc fa, f~-
Dtu
	 -!•

4/9/91
4/9/92
.4/9/91
4/9/92
4/9/92
4/9/92
4/9/91

4/9/92
4/9/92
4/9/91
4/9/92

4/10/92
4/10/92
4/10/92
4/10/91
4/10/91
4/10/92
4/10/92
10/92
4/10/92
4/10/92
4/10/91
4/10/92
4/10/91
4/1 0/92

4/10/92
— — -^ ^-_
IPnn***
Coordintiei
	

E 24495
N 9895
E 24410
N 9840
E 142*0
N9180
E 24500
N9720
E244SO
N9760
E 24540
N9720
E 24540
N9720
E 24540
N 9760
E 24440
N 9840
E 24420
N9840
E 24440
N9S10
E 24340
N 9720
£24300
N976Q
E 24380
N9740
E 24420
N 9800
E 24420
N-9720
E 24JOO
• N9SOQ
E 14460
N9SCO
E 24440
N9SOO
E I44«
N9S40
E 143 SO
N9IOO
E 24340
N 9S20
£24340
N 9630
E 24340
N9740
E 24420
N9760
E 24330
N 9730

1,1-DCE
(ppmv)
^•— «^— »— i^^^^.

U.WJ
<0.04

.
ci»-l,2-DCE
(ppmv)
•^^•^_u^^^^^^^^

<0.09
<0.09

<0.ll
<0,ll
 Unbx
	 -_
rt
° 0
n
0 0
0.57 0
0 n
U 0
0 n
u 0
0 n
v U
0 n
0 0
0 n
V 0
0 n
v U
Q A
U
0 n
u
0.08 o
OJS o
0 0
V
0 n
v y
• o o
w V
0 0
'0 .Q
0 0
0 0
0 • 0
0 0
3.SS 1
a o

0 0
0 0


-------
Tible  2.
                                AJ11(
ftr*. U«. Su,vcr « *e PRIDC0 M,^ Ps,k, Febmi(y ^ Ap ., ^ QU B ^^
Sample I.D,
^— ^— ^— i— _
C-I39
A-383
A-3I4
C-190
C-190*
Trlcdvng Ptcklffino
r
A-337
A-338
A-33S*
A-339
A-340
A-341
A-342
A-343
A-344
A-345
A-344
A-347
A-34S

A-348*
C-IJS
C-159
C-I60
C-I60*
C-161
1 	 • 	 — 	
Dile
_
4/10/91
4/13/92
4/13/91
4/13/92
4/13/91

4/7/91
4/7/92
4/7/92
4/7/92
4/7/92
4/7/92
4/7/91
4/7/92
4/7/92
4/7/92
4/7/92
4/7/92
4f7/92

4/7/91
4/7/92
4/7/92
4/7/92
4/7/92
4/7/92

Coordinate*
E 24340
N9800
E 24340
N 97JO
E 24340
N9800
E 14320
N 9800
E 24320
. N 9800

E 24060
N9720
£24140
N9720
E 24140
N9720
E 24220
N 9680
E 24130
N 9680
E 24100
N 9630
E 24220
N 9640
E 24180
N9S40
E 24100
N9«40
E 24140
N 9640
E 24120
N 9560
E 24220-
N 9320
E 24230 -
N 9400
E 24210
N 9fiOO
E 24100
N 9720
E 24ISO
N 9720
E 14210
N9720
E 24220
N 9720
E 24140
N 9630

1,1-OCE
(ppmv)
0.4J
1J7
<0.11

-------
        2.
Simple t.O.
C-162
C-163
A-349
A-3JO
A-351
A-332
A-353
A-I54
A-3I5
A-3J6
A-337
A-358
A-3J3'
A-J39
A-360
A-36I
0164

C-165
C-166
C-1S7
C-1S1
C-169
C-169'
C-170
C-17I
C-172
-
D*te
^•.
4/7/92
4/7/92
4/8/92
4/8/92
4/3/92
4/8/92
4/8/92
4/8/91
4/8/92
4/8/91
4/3/92
4/8/92
4/8/92
4/8/92
4/8/92
4/8/92
4/8/92

4/S/92
4/1/92
4/8/91
4/3/92
4/8/92
4/8/92
4/8/92
4/3/92
4/8/92
	
Coordinate!
E 24060
N9610
E 24060
N 9640
E2413J
N 9640
E 24200
N 9«40
£24140
N 9«00 •
E 14100
NMOO
E 24100
N9J20
E 24C60
N 9520
E 24060
N 9-180
EZ4C60
N 9400
E 24100
N9400
E 24140
N 9140
E 14140
K 9240
E 24180
N 9240
E 24110
N 9310
E 24110
N94CO
E 14130
N 9400
£ 24130
N 9540
E 14140
N 9560
E 24100
N9J60
E 24060
N 9560
E24C60
N 9600
E 24060
N 9600
E 14060
N 9440
E 24100
N9340
E 14100
N 931S
1,1-DCE
(ppmv)
• <0.16
<0.16
<0.16
<0,16
<0.16

ei«-l,2-DCE
(ppmv)

-------
Simple I.D.
C-173
C-174

C-I7J
A-362
A>363
C-176
Sim Food
A-3JJ

A-316
C-191

C-19J

;pmv

vocj
DCE
TCE
PCE
PSUDCO
E201(iO. N 10800
Dtie CoardJtuiei
4/g/« E 24100
N 9240
4/8/92 E 24220
N9240
4/8/92 E 24220
N 9360
4/9/91 E 14120
N WSO
4/9/92 E 24120
N 9400
4/9/92 E 24220
N9630

4/13/92 / 129

4/13/92 *131
4/13/91 Jf 223

4/13/92 * 230

Piru per million by volume.
Duplioli ufflfk.
VoUuk organic campoundt.
Dichloroeihcnc»
Tfichlareeihene.
Tclnchloroethsne
I.I-DCE
(ppmv)
<0.!9
4.S3


-------
   ilitc   X  Stituiiury a( Detection FrcqucncUi and Canccnlnlioti ftingci for ilit Soil-Gil Survey il the PRIDCO Imluuri*! Ft it, Fcbruiry Through April 1991, V«jt Alu, Puerto Rico.


No. orStmpling
Pointi AiutyieiJ Ami
76
61
61
25
21
19
17
27
48
61
S9
12
W
90
46
4
Concrete
Put
Ifondi
Creek
C.rihc OE
Pi dine Lol
Cirilx: Olt
Mini 1II.IB. NIL 1
Ciril* QE
Pit-rt Illtlu, Nil. 2
Rovipik
Dnintge
Ditch
Former
Driiiȣe
Piled
Formerly
Weil Co.
Weil Co. No. 1
Wca C
-------
 TiMe   J. Siiminiry of Detection Freqiicncici and Conctnlnlion Ringti for the Soil-Git Survey il Ihe PRIDCO Imluilrii! Pirt, Fru«iy Through April 1992, Vcf * All*. Puerto Rica,
                                                                                                                                                                                 P.M. J of 2
cii-t.2-DCG
No, df Stmplinr; Detection
Poinn Aiuly/ol Are» ' Frequency
76
61
61
25
21
19
17
27

41
61
V)
12
69
90
46
4
CimCfcIC |X
Fill
IlonJi Oil
Creek
C>rihe GE 0* •
Pirtini; Lot
Cirihe Of, Pilot 16*
IIWE. Nn- 1
Cirihe O6 Pilnt 5*
lll.le. NIL 2
Rovipit OX
Drtinife 0%
Ditch
Former OX
Ditch
Formerly 256
Weil Co.
Weil Co. No. 1 IX
Wen C<>. No. 2 OX
Din Ceriniicg 0%
fltrnun Aulo OX
Cirilie fif: 12 X
Control Plinl
TeMync ruckling 21
Sim Food .. 0%
Concentration
Ringc
' tppmv)
< 0.04 -0.53
<0.06- <0.12
<0,07- <0.22
0.32 -55.74
<0.07-0.ll
<0.0g- <0.|4
<0.07- 
0.09 - 1 .23
<0.04 - 0.04
<0.t^ - <0.08
<0.04 - 
-------
T.bU 4. 5^^£W£*tm*U for *. Soil-C.. Sun«, ,t *e Veg, ^ S(unieipil Undfiu
Simple I.D.

Lmdfill
A-337
A-3ZS
A-388*
C-193
C-194
C-19J
C-19fi

A-389
A-390
A-391
A-392
A-393
>-394
A-J94-
A-395
C-I97
C-198
0199
C-100
C-200-
010 1
0202
C-103
A-396
A-397
A-39S

Diu


4/13/91
4/13/92
4/13/92
4/13/91
4/13/92
4/13/92
4/13/92

4/14/92
4/14/92
4/14/92
4/14/92
4/14/91
4/14/91
4/14/92
4/14/92
4/14/92
4/14/92
4/14/91
4/14/91
4/14/92
4/14/91
4/14/91
4/14/92
4/13/92
4/13/92
4/13/92
Coordinate*


NEIOO
NW400
NEIOO
NW100
NEIOO
NW100
NEIOO
NW300
NEIOO
NW200
NEIOO
NWIOO
NEIOO
NWIOO
NESO
NWIOO
NEIOO
NW430
NEIOO
NWJOO
NE1J3
NWSOO
NE200
NWfiOO
NEIOO
NWSOO
NEIOO
NWSOO
NE200
NW700
NE130
NWIOO
NE150
NW400
NEIOO
NW350
NEIOO
NWSOO
NEIOO
NWfitV
NEiOtl
NW700
NE200
NWSOO
NEIOO
NV/900
NE300
NW500
NE300
NW700 .
NE400
NW700

l.I-DCE
/oomvl


<0.ll
<0.11
<0.11
<0.13
<0.13
<0.!3
1.01

<0.11
<0.11
<0.11

-------
   T«falc   4.
Siirrile I.D.
I^~——*^™™^^»^™
A-399
A^OO
C-204
C-20J
C-206
C-207
C-20S
A-401
A-W2

A-403
A-t04
A-10J*
C-109
-•2!0
C-210*
C-211
0212
.
Dttf^
4/1J/92
4/15/92
4/15/92
4/1J/92
4/15/92
4/13/92
4/15/92
4/1S/92
4/16/92

4/U/92
4/16/92
4/16/92
4/16/92
4/IS/92
4/16/92
4/16/92
4/16/92

Coordtmiei
NEI75
NW700
' NE573
NWSOO
NE200 •
NWOO
NE400
NWSOO
NEiOO
NWTOO
NEJ75
NVS50
NEIOO
NW800
NEIOO
NW42J
NE2JO
NW650
NE350
NWS50
NE400
^fWlooo
NE400
mviooo
NEIOO
NW37S
NE23
NW700
NE25
NW700
NE400
NW900
NES75
NW900
1,1-DCE <"n»-I,2.DCE
	 £EEE^ 	 fg^mvi
<0.09 07
^•/l t 1 ...

-------
  Parameter
 Phenol
 1,4-D:cnIorobenzene
 2-Mechylnaphthalene
 Isophorone
 Di-n-buty phtbalate
 Butyl benzyl phthalate
 bis(2-Ethylliesyl)pbthalaie
 Acetone
 Eerarne
 Toluene
 Ethylbenzene
 Xylenes (total)
 4,4-DDE
 Cyanide, Total
 Aluminum
Arsenic
Barium
Beryllium
 Calcium
 Chromium
 Cobalt
 Copper
 Iron
 Lead
 Magnesium
 Manganese
 Mercury
 Nickel
 Potassium
 Silver
 Sodium
 Vindium
 Zinc

Septic Tank 1
(«g/L)
24
26
7
380
2
170
3
59
207
36.3
0.759
109,000
7
130
719
10.1
6,940
13.8
3.52
Duplicate
Septic Tank 1
(«g/L)


J
390
J
170
J
23 J
224
35,5 B
0.786 B
94,700
7.06 B
113
683
8.68
6,780
19.1
4.22
                                                           Septic Tank 2
                             30,900

                               224
15,200 B

30,000

   198
                                                                8.400
                                                                2,300'
                                                                1,400
                                                                3,800
     66
    120
   0.241
      4
 31,700
    114
    562
    1.3
    155
301,000
  2,300
   75.4
  1,540
248,000
 • 2,150
 14,000
  1,030
    3.5
  1,210
 29,400
   30.9
 77,400
   141
 26,300
                                                                           Duplicate
                                                                         Septic Tank 2
                                                                            (ug/L)
                                    180 J
                                  9,000 E
                                   630
                                   440
                                  3,300
                                                                               3,700
+*
"g/L
N

Source:
       JSisr*1"level fct *** •"* **•"' .|~i——*• >—*
       Secondary MCL.
       Proposed MCL.
       Micrognms per liter.
       Estimated value below detection limit.
       Riported value was obtained from a reading that was less than the CQnr^f    - AJ    -   .
       but greater than or equal to the instrument detection liSI           ™ ^^ ^"^ iimt'
       The reported value is estimated because of the presence of interference
       Spike recovery not within control limits.
              Lawson Associates,  Ice. (1991).
                                                                                             MCL
                                                                                            (ug/L)
    5
 1,000
  700
10.000
   *• -m-
  200**
   50 *
   50
2.000
    4 **
    5

  100

1,000*
  300*
  50

  50 *
.  2.0
  100 *

  100*
                                                                                            5,000*

-------
Table   6.  Summary of Septic Tank Sludge Analytical Results, Tdedyne Packaging, Inc.,
           Vega Alta, Puerto Rico.

Parameter

Benzene
Chlorobenzene
Bariu.Ti
Cadmium
Chromium
Mercury
Silver
Reactive sulfide
2,4,5-TP (Silvex)
. ug/L Micrograms
Septic
Tankl
(ug/L)
1,030
1,290 .
840
5.8
23
6.1
20
5,600
2.67
per liter.
TCLP Toxicity Characteristic Leachate
Septic
Tank 2
(ug/L)

108
500

56


630


Procedure.
TCLP
Limit
(ug/L)
500
100,000
100,000
1,000
5,000
200
5,000

1,000


 Source:    Harding Lawson Associates, Inc. (1991).
 pxow.au

-------
       7.     Volatile Organic Compounds Concentrations Detcclcd by CLP Laboratory Analysis of Soil Sampki, PRIDCO Induslrial Park, Oclolicr 1992 to Mirch 1993, 00 II Remedial
             Investigation, Vega Alia, Puerto Rica.
                                                                                                                                                                                 Page I nf
Sample 10:
Aiulyic Due:
lilnrniiicllianc
mmointillmiie
'myl tJilifiiilc

Iciliylcue chloride
. L-KIIIC
nilmn disulfidc
l-DiciiliiriHilhciu
I'llitltliiriiL-liiniit:
> iJiiJiliiioullienc {tii/lfoiis)
liliiriifuriri
2 Dicliloriidlinnc
HllltttMUIC
1 .1- Tiii-liliKimliiiic
niliiin leiracliloriilc
-tifiimlicliliiruinelhtna
2 IJiolilnnifiMipDne
v 1 , J Oithlufopropene
ii;li)iirui;[liL'iK

1 .2-1 rltli!iifui:ih«ne
:n/t;iic
mi- i, J-OlelilOfoprnpcne
lllllOlllfTII
Mi:Lhyl-2-f><:i»tfti|imc
llexnnmic
l.2.2-')'eifni.'l(linneilinnc

jliicitc
il.xol.ciuvnc
tiylbcn/ene
yrcnc
fltiiui (UHtil)
BH-03A
tl-DiC-92
12 U
12 U
12 M
12 U
12 U
12 UJ
12 IJ
I2U
12 U
SJ
12 U
12 U
12 CJ
13 U
!3U
12(1
12 U
12 U
12 U
12 U
12 I)
12 U
12 U
12 U
12 Ij
12 IJ
12 U
I2U
12 IJ
12 U
12 IJ
12 U '
12 U
Dll-05
31 i')~
30 Oci-92
13 U
13 U
13 IJ
13 U
13 U
13 ';l
13 U
13 U
13 U
I3U
13 U
13 U
13 U
13 U
13 U
IIU
IJU
13 U
13 U
13 U
13 U
13 U
13 U
13 U
13 U
13 IJ
13 U
13 IJ
13 U
13 U
13 U
13 U
13U
D 11-09
(9,5'-
II. V)
l6-D»-92
It U
II U
II IJ
It U
IIU
11 (I
II U
II U
II U
II U
1 J
II U
II U
IIU
II U
II U
II U
11 U
II U
II U
II U
II U
II U
II IJ
II U
IIU.
11 U
II U
II U
H U
It U
IIU
M U
DIMS
(77.S--
79.0')
3 Dcc-92
12 U
12 IJ
12 U
12 U
12 U
i J
12 IJ
12 U
12 U
12 U
12 U
12 U
I2U
12 U
12 U
12 U
12 U
12 U
12 U
12 U
12 U
12U
12 U
12 U
12 U
12 UJ
13 U .
1211
121)
12 U
12 U
12 U
12 U
BII-2IA
(9.S--
I7.M»r-93
13 U
1311
13 tJ
13 U
13 U
13 UJ
II J
13 U
13 U
IJU
13 U
I3U
13 U
13 U
13 U
13 U
13 U.
13 U
13 U
I3U
13 U
13 U
13 U
13 IJ
I3U
13 U
13 U
13 U
13 U
13 U
13 t)
13 U
13 U
011-24
<4->.S'-
itl.J')
lO-F*b-93
12 UJ
12 U
12 U
12 U
12U
12 UJ
12 U
12 U
12 U
12 U
12 U
12U
12 UJ
12 U
12 U
12 U
12 U
12 U
12 U
12 U
IJU
12 U
12 U
12U
12 UJ
12 UJ
12(1
1211
12 U
12 U
12 IJ
12 U
I2U
BH-7.SA
(29.V-
JI.S')
27-Jin-93
MU
14 tJ
14 U
H U
14 U
M UJ
14 U
4 J
120
240 P-DJ
7J
MU
HU
M U
HU
HU
HU
MU
2200 D
MU
44
MU
14 U
14 U
HU
14 U .
14 U
MOO DJ
H U
H U
HU
14U
HU
DII-25A
(64 .5'-
27-J»n-93
14 UJ
M UJ
M UJ
14 UJ
M UJ
14 UJ
M UJ
14 J
48 J
79 J
3 J
H UJ
H UJ
HIM
H UJ
H UJ
H UJ
M UJ
JOOOOJ
14 UJ
I7J
HUJ
14 UJ
14 UJ
M UJ
14 UJ
14 UJ
250 DJ
H UJ
14 UJ
14 UJ
H UJ
M UJ
BII-26A
1!#
4-F(b-93
13 UJ
13 UJ
13 UJ
13 UJ
13 UJ
4 J
13 UJ
13 UJ
13 UJ
13 UJ
13 UJ
13 UJ
13 UJ
13 UJ
13 UJ
13 UJ
13 UJ
13 UJ
13 UJ
13 UJ '
13 IJJ
13 UJ
13 UJ
13 UJ
13 UJ
13 UJ
13 UJ
13 UJ
13 UJ
13 UJ
13 UJ
13 UJ
13 UJ
BII-26A
(9.V-
I(.S')
4-Feb-93
13 UJ
13 UJ
13 IJJ
13 UJ
13 UJ
9J .
13 UJ
13 UJ
13 UJ
13 UJ
13 UJ
13 UJ
13 tJJ
• 13 UJ
13 UJ
13 UJ
13 UJ
13 UJ
13 UJ
13 UJ
13 UJ
13 UJ
13 UJ
13 UJ
13 UJ
13 UJ
13 UJ
13 (IJ
13 UJ
13 UJ
13 UJ
13 UJ
13 UJ
HH-2fiA
(64.5'-
68.5')
S-Feb-93
13 U
13 U
13 IJ
13 U
13 U
13 UJ
13 U
13 IJ
13 IJ
13 U
13 U
13 U
13 UJ
13 U
13 U
13 U
13 U
IJU
13 U .
IJU
13 U
13 U
13 U
13 U
13 UJ
13 UJ
13 U
U U
13 U
13 U
13 U
13 U
13 U
BII-31
04.5'-
36.V)
20-Jm-93
14 U
MU
H II
14 U
14 UJ
14 UJ
14 U
7 J
3 J
28
M U
H UJ
M U
14 IJ
MU
MU
H tJ
HU
61
MU
H U
HU
14 U
HU
14 UJ
14 UJ
HU
S J
M tl
HU
M U
14 U
H U
BH -31
(IJ.S'
16. S')
14 U
M U
M tl
H U
S J
33 UJ
14 U
14 It
H U
II J
14 U
. 14 U
14 IJ
H U
HU
H U
14 IJ
H U
16
14 U
14 U
14 II
14 U
M U
M U
14 II
M U
14 tl
14 U
14 It-
14 U
H U
M U
1,11yIc ciincciitraliiins in miciogrami per kilocranl {parts per billion fp|>l>)).
inlysei were performed l>y various analytical sulicunlrnclon, using itaiidaril U.S. Environmental Protection Agency (USCPA) methodology.
    Tin cdinjKiuniJ wax alsn dutoclcd in Ihc nssncblcd inelhoJ lil.irtk.
    C
-------
r:.Mi:  7.     Vrilatilc Organic Comixiuiuh Conccnlrnlions Dctcclcil hy CLP Lfllionilory Analysis of Soil Samples. PRIDCO Induslrial Park, Oclol>cr 1992 in Morcli 1993. OU II Remedial
              liivosliiraiinn. Veua Aha, Puerto Rico.
                                                                                                                                                                                     Page 1 i
Sin>|.L- ID.
Dcpih:
Analyli Due:
„
'i Jl A
Vinyl chloride
tliMliyliMie chlnride
Vclcme
.'urltufl ilttuirille
.(•Okhiiiriwthcne
. 1 Dkltliiincilmne
.2 Nii-liliifoctliciic (cii/lrniii)
'lilcuofiinn
•TlillUMIIIC
. J.I Tin. Jilnrncllmne
udiDii ttiiacldoridc
	 KKlj(:h|ll,,,llleil,MC
, 2 • 1 >it lihiiuprofiMie
iv 1, J r>iclifo(O|>fnpcnc
•i^Ku'i'iudiiiiromvlhane
. 1 ,2-Tikliloriictlmne

K. t 3>nichlik/m>runcnc '
' J
Mclhyl-2-pealannnc
n
^*"".pj)(ic Mofinnlinnc
4 '"'r, ,.•
I
Mi>ri>lu:ti?i:nc
•ll •jlltll/UIIC
v'r -He
yltiiti (lota!)
nn 33
6.V)
2t-J»n9J
12 U
)•> (I
13 UJ
P U
12 U
13 tJJ
12 U
12 U
I2U
12 U
12 U
12 U
12 U
1211
12 U
12 U
12 U
12 U
12 U
12 U
12 U
12 U
12 U
P UJ
12 U
P U
12 U
12 U
I J
12 U
12 U
12 U
12 U
BII-33
(9.J-
11.5')
13 U
13 U
13 UJ
13 U
13 U
17 UJ
IS U
IS U
ISU
13 It .
ISU
13 U
13 U
IS U
13 U
13 U
tsu
13 U
13 U
1JU
ISU
IS U
13 U
13 UJ
13 U
13 U
13 U
13 U
13 U
ISU
13 U
13 U
ISU
DII-33
(I9.31-
2I.S')
ll-Jin-93
13 U

jiu
13 U
ISU
19 UJ
13U
ts u
ISU
IS U
13 U
13 U
13 U
13 U
IS U
13 U
40
ISU
ISU
13 U
13 U
t3 UJ
ISU
13 U
13 U
13 U
13 U
13 U
IS U
13 U
13 U
1111-33
<29.S'-
31. 5')
22-Iin-93
IS IJ
13 U
13 UJ
ISU
ISU
13 UJ
IS U
SJ
ISU
IS U
13 U
IS U
13 U
ISU
ISU
13 U
ISU
13 U
85
ISU
2J
IS U
13 U
13 UJ
13 U
13 II
ISU
13 U
13 U
IS U
13 U
13 U
13 U
nil-33
(39.S1-
12 J
13 U
IS UJ
ISU
ISU
13 UJ
ISU
IJ
IS U
IS U
ISU
IS U
ISU
IS U
ISU
13 (1
ISU
13 U
57
tsu
1 J
ISU
13 U
13 UJ
13 U
13 U
ISU
13 U
IS U
13 U
IS U
13 U
13 U
DII-33
Jl'sV
13 U
13 U
IS UJ
13 U
13 U
13 UJ
13 U
ISU
13 U
13 U
ISU
13 U
1311
IS U
ISU
ISU
13 U
13 U
5J
ISU
13 U
tsu
13 U
13 UJ
13 U
13 U
13 IJ
13 U
13 U
13 U
13 U
13 U
IS U
nil-33
(69. S'-
7i.v>
25-J«n-93
13 U
ISU
13 U
ISU
13 U
13 UJ
ISU
ISU
13 U
ISU
13 U
ISUJ
ISU
13 U
ISU
13 U
ISU .
ISU
13 U
13 U
ISU
13 U
ISU
13 II
ISUJ
IS UJ
13 U
13 U
IS U
13 U
13 U
13 U
13 U
DII-33
(B9.V-
SI.3')
25-Jift-93
14 II
14 U
14 U
14 U
14 U
14 UJ
14 U
14 U
14 U
14 U
14 U
I4U
Mil
14 U
14 U
14 U
14 U
MU
42
14 U
14 U
[4 U
14 U
14 IJ
14 U
14 U
14 U
2 J
14 U
14 U
14 U
14 U
14 U
HI! 34
(49.5 '-
SI.S')
l-F«b-93
ISU
1511
1511
ISU
IS U
ISUJ
ISU
24
2 J
6J
15 U
ISU
IS UJ
IS U
tsu
ISU
ISU
ISU
75
ISU
15 U
ISU
ISU
IS U
1SUJ
ISUJ
ISU
I2J
15 U
ISU
ISU
tsu
ISU
DII-34
(59.S--
61. 5')
l-Fcb-93
16 U
16 U
16 U
16 U
16 U
16 UJ
16 U
16 U
16 U
16 U
16 U
16 U
16 UJ
16 U
16 U
16 U
16 U
16 11
16 U
16 U
16 U
16 U
1611
J6U
16 UJ
16 UJ
16 U
2 J
16 U
16 U
16 U
16 U
16 U
BII-38A
(14.5'- .
16.5')
l7-Dtc-?2
M UJ
II UJ
II UJ
II Hi
II UJ
II 111
11 01
1 1 UJ
II UJ
M tJJ
II UJ
11 UJ
II UJ
II UJ
It UJ
II UJ
II UJ
II UJ
It UJ
11 UJ
1] UJ
11 UJ
It ID
M UJ
11 UJ
II UJ
11 UJ
II UJ
II UJ
II UJ
11 UJ
II US
11 UJ
u.'ilyii: L-nticcnlralioni in micrngrami perkitoenm (parti per litllion (ppl>|).            • •
lutyvcs WLTL- |>crfnrmcd liy vanuut analytical siilicbnlrntfors, using standard U.S. Environmental Prolcclion Agency (USbPA) methodology.

     UIL- enincoiinil wai ,ilin detected in llie associated tnclhod iilank.
     f.'iiinpoiind cortceiilrnliim was dclcnnincd ul a secondary dilution factor.
     lisliiiultil remit.
     1 lit: t in ii |s mud Witt aniily/al for, lull nnl delected it I tic corresponding rqwjling limits.

-------
Tibte
 of SoU S^lc, frem
.  OU H RcmedUl lavcuf
                                       PRJDCO tad..*., Ptrt.
                                      Vtgt Alt*, Puerto RJco.
                                                                                                                 I of U

Simple l.D.
(Depth in A bli)
BH-06 4.5-6.5
BH-06 9J-I1J •
BH-06 14.5-16.5 •
BH-06 19J-21J
BH-06 24J-26J •
BH-06 29J-3IJ •
BH-06 34-5-36-5 •
BH-06 39.5-41.5 •
BH-06 44.5-46 J -
BH-06 49J-5I.5 •
BH-06 54.5-56.3

BH-05 4 .S-oJ
BH-05 9.5-1 1J
BH-05 14.5-16.5
BH-05 19.5-21.5
BH-OJ 24.5-26.5
BH-05 29,5-31.5 *
BH-05 34.5-36.5
BH-05 39.5-J1.5
BH-05 44.5-46.5
BH-05 49.5-5 !J
BH-05 54.5-55.2
BH-05 59.5-59.9
BH-04 4.5-^.5
BH-04 9.5-1 U
BH-04 14.5-16.5
BH-04 19.5-21.5
BH-04 24.5-26.5
BH-CJ 29 .5-3 1 J
BH-04 34,5-36.5
BH4W 39J-41.5
BH-04 44J-M.5
BH-04 49.5-JI.5
BH-(W 54.5-56.5
BH-OJ 59.5-61.5
BH-04 64.5-65.1
BH-04 69.5-70.3


BK-36 4.5-S.5
BK-3S 9.5-11.5
BH-36 14.5-14.5 •
BHOS 19.5-21 J •

BH-36 2-t.5-'6.5 •

Sc: lilt pi£c Tor fooL-un.--.
D*Lc
Stmpicd
jons/92
10^8/92
loasm
1 0/21/92
IOT2S/92
10/2S/91
10/28/92
IQ/2S/92
\mW2
10^8/92
• 10/29/92

10/30/92
10/30/92
10/30/92
10/30/92
10/30/92
1000/92
10/30/92
10/30/92
10/30/92
10/30/92
10/30/92
100 0/92
2/1/93
2/1/93
2/1/93
2/1/93
2/1/93
2/1/93
2/2/93
2/2/93
2/2/93
2/2/93
2/2/93
2/2/93
2/2/93
1*2/93

1-3/93
2/3/93
i'3/93
*in;oi
— - jjyj

2/3/9,3
1

Location
FDD
FDD
FDD
FDD
FDD
FDD
FDD
FDD
FDD
FDD
FDD

FDD
FDD
FDD
FDD
FDD
FDD
FDD
FDD
FDD
FDD
FDD
FDD
FDD
FDD
'FDD
FDD
FDD
FDD
FDD
FDD
FDD
FDD
FDD
FDD
FDD
FDD

FDD
FDD
FDD

FDD

FDD


l.l-DCE

ND
wrj
nu
ND
ND
ND
• ^ &•*
ND
ND
ND
ND
ND
ND

ND
. ND
ND
Nn
nt^
ND
ND
ND
ND
wn
r*u
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND

ND
ND
wn
WLJ
vr*
i™ tj
ND



tnuu-l.2-DCE
(Ug/kf)

ND
ND
20
16
19

11
16
20
ND
un
rn/
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
.ND
ND
ND
VT-l
f*D
ND
ND
42

4




TCE
(uj/kf)

ND
ND
ND
49
120
36
50
11
450
11
10
ND
ND
ND
ND
ND
ND
•ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND-

ND '
ND
ND
ND

ND

ND

PCE
(«{/ke:
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
' ND
ND
ND
ND -
ND
ND
ND
ND
ND
ND
ND
ND
'ND
ND
ND
ND
ND
ND
4
ND
' ND
ND
. ND
• 1
U

ND
ND
ND
ND

ND

ND

-------
T.W.   4.      *»,,,;, Of v.Wh 0,«* C^pou* Concern™^ Dc(MUll br Re|J Cu o^
              of So.! Simple, from BoreKot*,, PRIDCO !rul<««ri*| P,,k. Ocujbcr 1992 to M.tch 1993
               OU n &ctnc4u] LivcKigiiiao, Vej» AIU, Pueno Rica.
2 ofu

Stmplc I.D.
(Depth in A bit)

BH-36 29J-3I.5 •
BH-36 34.S-36.5
BH-36 39J-U.5 *
BH-3S 44.5-46.3 •
BH-34 49J-J1.5 •
BH-36 54J-36.J •
BH-36 J9J-6I.5 •
BH-36 70.0-70.1 •
BH-IO 4.5-6.3
BH-IO 9J-11.3
BH-10 I4J-I6.5
BH-10 I9J-21.J
BH-10 24.5-26.5
BH-10 29.5-31.5
BH-IO 34.3-36.5
BH-IO 39J-UJ
BH-10 44.5-W.i
BH-IO 49,3-51.5
BH-10 34,5-55.4
BH-1! O-6.5
BH-11 9J-I1.3
BH-ll I4J-K5.5
BH-11 19.5-H.5
BH-11 24.5-26.5
BH-11 29.5-29.8
BH-U 34.5-36.3
BH-ll 39.5-11.5
BH-ll 44.S-W.5
BH-ll 49,5-31.5
BH-ll J4.5-54.S
BH-H 59.5-60.0
BH-35 0.5-2.5
BH-35 4.5-6.5
BH- 3 9.5-11.5
BH- 3 14.5-16.3
BK- i 19. 5-: 1.3
BH- 5 29. 5 -31. 5
BH- < 34.5-34.9
BK- i 39.5-*l.5
BH- j 44.5-^.5
BH- i 49.5-;9.9
BH- : 54.5-J6.5
BH- 5 3».i-50.0
Sdi liu f,St ;a, foouiouj.

D«l£
Sampled

mm
mm
mm
2/3/93
2/3/93
mm
20/93
1/3/93
11/2/92
11/2/92
11/2/92
11/2/92
1 1/2/92
11/2/92
11/2/92
11/2/92
11/2/92
11/2/92
11/2/92
1 1/4/92
1 1/4/92
11/4/92
11/4/92
1 1/4/92
11/4/92
' 1 1/4/92
11/4/92
11/4/92
1 1/5/92
11/5/92
1 1/5/9 2
11/3/92
11/3/92 '
11/5/92
11/5/92
1 1/5/92
1 1/5/92
11/5/92
ll/i/92
1 1/6/92
II -'6/92
ll,'6;92
1 1/6/92


Lociiion

FDD
FDD
FDD
FDD
FDD
FDD
FDD
FDD
FWC
FWC
FWC
FWC
FWC
FWC
FWC
FWC
FWC
FWC
FWC
FWC
FWC
FWC
. FWC
FWC
FWC
FWC
FWC
FWC
FWC
FWC
FWC
FWC
F>VC
FWC
F.VC
FiVC
F.VC
- F.VC
FiVC
F*C
F.VC
F.VC
F.VC


l.l-DCE
(ug/lcg)

ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
5
•is
2S
7
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
1

f»ni-:,2-DCE
fuff/Vffl

ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
NO
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND'
. ND
-

TCE
(ugflcj)
" • II 	
ND
ND
ND
ND
40
J3
us
67
ND
ND
ND
ND

ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
' ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
i

PCE
(UJ/kj)
ND
ND
ND
ND
ND
ND
ND
10 -
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
. ND
ND
ND
ND
ND
ND
ND
.ND
ND
ND
ND
: ND .
ND
ND
ND
ND
ND
ND
ND
ND
ND


-------
Tiblt   S.      Ajwlyii, of VoUcile O^.nic Compound Con«mra.i0iu
              of Soil Simple* from Boreholei. PRIDCO Injuuhil Pi,
               OU n Remedial Inve«jf»uon, Vig. AJlt, Puerto Rica,
g:3 ofu
Simple I.D.
(Depth In ft bit)
BH-02 4.5-S.5
BH-02 9J-11J
BH-02 14.5-15,8
BH-02 19.5-2!. 5
BH-02 24.5-25.0
BH-02 29.5-30,6
BK-02 34.5-34.8

BH-01 4.5-«.5 ,
BH-01 9J-11.5
BH-01 14.5-11.5
BH-OL 19-5-21.5
BH-OI 2-U-26.5
BH-01 29.5-31.5
BH-Ot 34.5-36.5
BK-OI 39.5~«1.5
BH4I 49.5-50.8
BH-01 54.5-56.5
BH-01 59.5-6U
BH-01 64.5-66J
BH-fll 69.5-71.4
BH-12 4.5-6.5
BH-12 9.5-11.5
BH-12 14.5-16.5
BH-12 19.5-21.5
BH-12 24.5-26.5
BH-12 29 .5-3 1.5
BH-12 34.5-36.5
BH-12 39.5^1. 5
BH-12 44.5-t$,5
BH-12 49.5-51.5
BH-!2 56.5-JS.5
BH-12 59.5-SI.5
BH-12 64.5-66.5
BH-12 69.5-7L5
BH-12 74.5-77.0

BH-iJ 4.0-6.0
BH-14 9.0-II.O
BH-i- 14.0-16.0
BK-14 19.0-21.0
BH-L4 24.0-26.0
BH-M 29.0-31.0
BH-i- 34,0-34.0
BH-I-J J9.0-41.Q
Ses Ijii pigc tor focuiout.
Due
S.replcd
11/6/92
11/4/92
11/6/92
11/9/92
11/9/92
11/9/92
11/9/92

11/9/92
11/9/92
It/9/92
11/9/92
11/9/92
11/9/92
11/9/92
11/9/92-
11/9/92
11/10/92
11/10/92
11/10/92
11/10/92
1 1/ 11/92
11/11/92
11/11/92
11/11/92
11/11/92
11/11/92
I I/I 1/92
ll/tl/92
H/ll/92
11/11/92
.11/11/92
11/11/92
11/11/92
1 I/I 1/92
11/11/92

1 1/16/92
It/16/92
11/16/92
11/16/92
11/14/92
11/16/92
11/16/92
11/17/92

Loeiiion
R/M
R/M
R/M
R/M
R/M
R/M
R/M

R/M
R/M
R/M
R/M
R/M
R/M
R/M
R/M
R/M
R/M
R/M
R/M
R/M
HA
HA
HA
HA
HA
HA
HA
HA
HA
HA
HA
HA
HA
HA
HA

HA
HA
HA
HA
n ,T
HA
HA
HA
HA

1,1-DCE
(ug/fcg)
tjn
ii i/
Wf-l
PiU
Nn
jiu
wn
1^ U
ND
ND
ND

Nn
»u .
.^D
ND
ND
ND
ND
Nn
i* LJ
Nn
11 l_r
Nn
nu
ND
ND
ND
ND
KITl
nu
ND
ND
jjri
"M
ND
ND
ND
ND
•jr.
PiL/
1 ND
ND
ND
ND
ND
ND

ND
ND
ND
ND
w ni
c*u
ND
sfr\
riiJ
ND

tnn»-1.2-DCE
(uj/fcB) .


ND
ND
ND
ND
ND
ND
ND


ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND

ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND.
ND
tin
f*u
ND
ND
ND
ND
ND
ND
ND
\m
nU
TCE
(Kg/kg)


NO
ND
ND
ND
ND
ND
ND

ND
ND
ND
ND
ND
ND '
ND
ND
ND
ND
ND
ND
ND

ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
PCE
{ug/kg;

ND
ND
ND
ND
ND
ND
ND

ND
Np
ND
ND
ND
ND
ND
NO.
ND
ND
ND
ND
ND

ND
ND
ND
" ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
10
ND
ND
ND
ND
ND
ND
W
ND

-------
Tible   •».      Ajulyiii of Volttik Oif inic Compound Conccmn M.rch 199J
               OU n Kemcditi l/iveujjiiioo. V<|t AJu, Putno Rico.
Page 4 Of
Simple I.D,
(Depth in (I bli)
BH-14 44.0-M.O
BH-14 49.0-51.0
BH-I4 55.0-56.!
BH-14 59.0-59.1
BH-14 M.0-64.1
BH-15 4.5-6.5
BH-15 9.5-1 1.5
BH-15 14.5-S6.5
BH-15 19.5-2 1. 5
BH-15 24.5-26.5
BH-15 29.5-31.5
BH-15 34.5-36.5
BH-ii 39J-II.S
BH-15 44.5-46.5
BH-15 49.5-51.5
BH-15 54.5-56.5
BH-15 59.5-61.5
BH-li 65.5-67.5
BH-15 69.5-70.7
BH-16 0.&4.5
BH-lfi 9.5-11.5
BH-!6 14.5-16.5
BH-16 19.5-21 j
BH-U 24.5-2S.5
BH-16 29.5-31.5
BH-16 34.5-36.5
BH-16 39.5-41.5
BH-16 44.5-46.5
BH-li 49.5-51.5
BH-16 54.5-55.1
BH-16 64.5-66.5
BH-16 70.5-70.7
BH-16 74.5-75.2 •
BH-17 4.5-6.5
BH-17 9.5-11.5
BH-J7 14.5-16.5
BH-17 19.5-21.5
BH-17 24,5-25.5
BH-17 29.5-31.5
BH-17 34.5-36.5
BH-17 39.5-H.5
Bri-iT 44.5-W.5
Sei tat puj. for fooL-icles.

Simpled
11/17/92
11/17/92
11/17/92
11/17/92
11/17/92
ll/IJ/92
ll/lg/92
I1/1K/92
1 1/18/92
11/18/92
11/11/92
I1/1S/92
11/18/92
11/18^2
1 1/13/92
It/11/92
1 1/ IS/92
11/19/92
11/19/92
1 1/20/92
1 1/20/92
1 1/20/92
11/20/92
1 1/20/92
1 1/20/92
11/20/92
11/20/92
11 /20/92
11/20/92
1 1/20/92
11/23/91
11/23/92
11/23/92
11/30/92
11/30/92
1 1/30/93
1 1/30/92
1 1/30/92
H/30,-92
1 1/30/92
11/30/92
1 1/30/92

^ ^—*-
Locition
KA
HA
HA
HA
HA
HA
HA
:A
HA
HA
HA
HA
HA
HA
HA
HA
HA
HA
HA
HA
HA
HA
HA
HA
HA
' HA
HA
HA
HA
K,*
HA
HA
HA
we
we
we
we
we
we
svc
we
we
" • • — ^

l.l-DCE
Cuj/lg)
ND
ND
ND
ND
ND
ND
ND
ND
ND
NO
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
-

««ni-I,2-DCE
(ug/kg)
ND
ND
ND
ND
ND
ND
ND
ND
. ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
. ND
' ND
ND
ND
ND '
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
• I

TCE
(ua/ke)
ND
ND
ND
ND
ND
ND .
ND
ND
ND
ND
ND
ND
ND
ND .
• ND
ND
ND
ND
ND
' ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND'
ND
ND
ND
ND
ND
ND
—— *^^— ^^^^^_
	
PCE
(Ug/tj)
••
ND
ND
ND
ND
'D
ND
ND
ND
ND
ND
ND
ND
ND
'ND
ND
ND
ND
ND
ND
ND
ND
• ND
. ND
ND
ND
ND
ND
ND
ND
ND
ND
' ND
ND
' ND
ND
ND
ND
ND
ND
ND
ND
ND


-------
Ti!iJ<   I.
                                     Compound C0n«n«™on
                                      ,, PWDCO W,,^, p.rt.
              OU U Remedial Wttipuoo. Vtj, AJu. Puerto Rjco.
                                                                    FleU C.

Sttnflt I.D.
(Depth in A bit)
BH-!7 49.5-51.5
BK-17 54.5-56.4
BH-17 64.5-46 J
BH-17 69_5-71.5
BH-U 4.5-6. J
BH-1! 9.5-11.5
BH-1J 14.5-16.5
BH-IS 19J-2U
BH-1 8 24.5-26.5
BH-1B 29.5-31.5
BH-lt 34.5-36.5
BH-lt 39.5-11.5
BH-ll 44.5-46.5
BH-14 49.5-51.5
BH-lt 54.5-56J
BH-IS 59.5-61.5
BH-IS £4.5-66.5
BH-18 69.5-71. 5
BH-1E 77.5-79.0 /
BH-19 4.5-6.5
BH-19 9.5-1J.5 .
BH-19 14.5-16.5
BH-19 19.5-21.5 •
BH-19 24.5-26,5 •
EH-19 19.5-31,5
BH-S9 34.5-38.5
BH-19 39.5-41.5
BH-19 44.5-W.5
BH-19 49,5-51.5
BH-19 54.5-56.5
BH-19 59.5-J9.S
BH-!9 64J-64.5
BH-19 74.5-76.5
BH-i3 4.J-6.J
EH-lj 9.5-11.5
BH-13 14.5-16.5
BH-Jj 19.5-11.5
BK-lj 24.5-25.5
BK-13 29.501.5
BH-I3 34.5-36.5
BH-o 39.5-41.5 •
BK-;i 4J.5-M.5 *


S*s iiti ptgt iot foot- oiis.

Ditr
Simplul
11/30/92
11/30/91
11/30/92
11/1/92
12^92
12H^2
12^92
i//OT2
I.J2/92
11^92
11^92
12^/92
ll/Wl
12/2/92
12/2/92
12^/92
12^92
m/92
12/3/92
12/4/92
12/4/92
11/4V92
J 2/4/92
12/4/92
11/4/92
12/4/92
12/4/91
J 2/4/92
12/4/92
11/4/91
12/7/92
12/7/92
1 in/92
12/S/92
12/3/92
12/3/92
12/S/V2
12/S/93
ll'S/92
tl'3/92
ll'S/92
O '1 r01
\-9ty-



Location
we
we
we
we
we
we
we
we
we
we
we
we
we
we
we
we
we
we
we
we
we
we
we
.we
we
we
we
we
we
we
we
we
we
we
we
we
we
we
we
\vc
we
\vc


l.l-DCE
(ue/tt)
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND



mat- l.l-DCE
(u|*z)
ND
ND
ND
ND
.ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
.ND
ND
ND
ND
4
m
7
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
. ND
ND
ND
ND
ND
ND .
MD
vr>
n y


TCE
(uf/ki)
ND
ND
ND
ND
ND
ND
ND ..
ND
ND
ND
ND
ND
ND
ND '
ND
ND
ND
ND
ND
ND
ND
ND
9
29
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND"
ND
ND
ND
ND
ND

ND

PCE
(wj'tf
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
; • ND
ND
ND
-ND
ND
ND
ND
ND
ND
ND
ND
' ND
ND
ND
ND
ND
ND
ND
ND

ND


-------
Tlble   g.
                    ii of Volitik Ocj.nie Compound Concern™^ D
                    S.B,,., frem fclcWB pR                   ««««- by Fi.
Simple I.D.
(Depih in fl bit)
— 	 • 	
BH-13 49.5-51.5 -
BH-13 54.5-54.8 •
BH-13 59J-60.0
BH-13 64.5-65.8
BH-13 69J-71.5
BH-13 74,5-74.6
BH-13 79.5-79.7
BH-13 84.5-84.9
BH-13 89.5-?. 5
BH-03A 4.5-6.5 •
BH-03A 9.5-1 U •
BH-03A 14.5^16.5 *
BH-03A 19.5-21.5 •*
BH-03A 24J-16J
BH-03A 29.5-30.8
BH-03A 39,5-IU
BH-03A 44.5-45.0
BH-03A 49J-50.3
BH-03A S4.5-56.5
BH-03A 59.5-61.5
BH-03A 64.5-66.1
BH-03A 69.5-71.5
BH-39 3.5-5.5
BH-39 g.5-10.5
BH-39 13.5-14.3
BH-39 1S.5-20.5
BH-39 23.5-25.5
BH-39 25.5-29,5
BH-09 4.5,6.0
BH-09 9.5-11.5 t
BH-09 14.5-16.4
BH-09 19.5-21.5
BH-M 24.5-26.5
BK-» 29.5-30.2
BH-33A 4.5-6.5
BH-3SA 9.5-11.5
BH-3SA 14.5-16.5 f
BH-2SA 19.5-21.5
BH-3SA 24.5-26.3
BH-33A 29.5-31.5
BH-38A 34.5-34.6
Ste !*u A.M.* r__ f. . ""

Utl£
Simp led
1 — -_
f •) <• Mf«
Ii/5/52
12/S/92
I2/S/92
12/8/92
12/9/92
12/9/92
12/9/92
12/9/92
12/9/92
12/11/92
12/11/92
12/11/92
11/11/92
- 12/11/92
12/11/92
12/14/92
12/14/92
12/14/92
12/14/92
11/14/92
12/14/92
12/14/92

12/J5/92
12/15/92
12/16/92
12/16/92
12/16/92
12/16/92

11/16/92
12/16/92
12/16/92
12/16/92
12/16/91
12/16/92

12/17/92
12/17/92
11/17/92
12,' 1 7/9 2
in 7/92
12.' 1 7/92
11/17/92
" 	 	

Locition
^ _

we
we
we
we
we
we
we
we
we
GEPP
CEPP
GEPP
CEPP
GEPP
CEPP
GEPP
CEPP
GEPP
CEPP
GEPP
CEPP
GEPP

GEPP
CEPP
GEPP
CEPP
GEPP
CEPP

CEPP
' GEPP
CEPP
CEPP
CEPP
Cc?P

CEPP
CtPP
GEPP
CEPP
GEPP
CEPP
GE?P

l.l-DCE
(ug/kj)
	 .
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND

ND
ND
ND
ND
ND
ND

ND
ND
ND
ND
ND
ND

ND
ND
ND
ND
ND
ND
ND
-.
«™n»-t.2-DCE
(Ug/lj)
	 	
ND
ND
ND
. ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
wrt
r»u
ND
. ND
ND
ND
ND
•LffK
HO
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND '
ND
-
TCE
<«*/*!>
— 	 ..—
ND
ND
ND
ND
ND
NO
ND
10
ND
ND
27
20
4
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND '.
ND
10
ND
ND.
ND
ND
ND
ND
ND
" ND -
ND
ND
ND
ND
ND
ND
ND
-.
PCE
(ui/kg;
—
ND
Mn
ND
ND
ND
ND
ND
ND
ND
ND
6
!
2
2
ND
ND
ND
ND
ND
ND
ND
ND
' - ND
" ND
ND
4
ND
ND
ND
ND
ND
ND
. ND
' ND
ND
ND
ND
ND
ND
.ND
ND

-------
T.We  8,
               Afl.ly.ii of VoUlile Orjtaie Compound Concsninijon. D«i««d by Reid C« Chrenuu.gf.ph
               of Soil Simplei from Boreholci. PIUDCO Induilriil p»rk, October 1991 Lo Mirch 1993
               017 II Remedial Invettifitioo, Vcfi AJta, Puerto Rico.
                                                                                                                      g:7 ofJ4
Simple t.D.
(Depth in ft bit)
BH-40 4.5-5.4
BH-*0 9.5-ll.J
BH-W 14 .5-15 .3
BH-40 I9J-J1J
BH-W 14.5-25.2
BH-40 29.5-30.4
BH-08 4,0-4.4
^8 9.0-11.0
BH-C8 14,0-14.3
BH-08 19.0-11.0
BH-08 24.0-25.6
BH-0! 29.0-29 J
BH37 4.5-8.5
BH-37 9.5-11.5
BH-37 14.5-16.5
BH-37 19J-21.5
BH-37 24.5-26.5
BH-37 29.5-31.5
BH-37 34.5-35 J •
BH-37 39.5-39.6
BH-37 49.5-50.9
BH-37 54.5-55.9
BH-37 59.5-^0.4
BH-37 64.5-M.5
BH-37 69.J-70.0
BH-07 4.5-6.5
BH-07 9.5-11.5
BH-07 14.5-16.5
BH-07 19.5-21.5
BH-07 24.5-26.5
BH-07 29.5-31.5
BH-07 34.5-36.5
BH-07 39.5-H.5
BH-07 4J.5-16.5
BH-07 49J-5L5
BH-07 54.5-56.5
BK-37 5 9. 5 4 1.5
BK-07 64.5-54.7
BH-07 69.5-71.5
BK-:s J.i-6.5
BH-ZS 9.i-l[.5
BH-:J nj-i6.5
Date
Sampled
12/14/92
12/18/92
12/18/92
11/11/92
12/11/92
11/11/92
12/1 1/92
12/11/92
12/1 S/92
12/ IS/92
. 12/1 S/92
1 IMS/92
- 1/7/93
1/7/93
1/7/93
1/7/93
1/7/93
1/7/93
1/7/93
1/7/93
1/11/93
I/I 1/93
I/I 1/93
1/11/93
. 1/II/W
1/I2/V3
1/12/93
1/12/93
1/12/93
L/12/93
1/12/93
1/12/93 .
1/12/93
1/12/93
1/12/93
1/12/93
1/12/93
1/13/93
1/13/93
1/14/93
1/14/93
1/14/93
Locioon
GEPP
CEPP
CEPP
CEPP
CEPP
CEPP
CEPP
GEPP
GEPP
CEPP
CEPP
CEPP
CEPP
CEPP
CEPP
GEPP
GEPP
GEPP
GEPP
CEPP
CEPP
CEPP
CEPP
CEPP
CEPP
CEPP
CEPP
CEPP
CEPP
GIPP
GEPP
CEPP
CEPP
GEPP
GEPP
GEPP
GEPP
GEPP
GEPP
GECP
GHCP
GECP
1,1-DCE
Cut/kg
ND
ND
ND
ND
Nt
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
inn*. 1,1-DCE
<"E/kg}
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
- NO
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND •
• ND
TCE
(ug/kg)
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
NO
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND'
ND
ND
ND
ND
ND
ND
PCE
(ug/kg)
ND
ND
ND
ND
ND
ND
ND -
ND
ND '
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
H V
un
f*i**
Nfl
t^t*
' • ND
ND
6 .
ND
4*1*
wn
4~4V
un
i^L»
Arn
T*U
Nn
C L/
ND
[* W
wn
r*u
t*n
*^
• ^n
f*4W
»*n
r»Lr
fcjrt
r»u
Kn
r«M
vrt
r*U
ND
VT%
k>LJ
ND
SO
S« list fi«t tor foouiOLci.

-------
Ttbli   1.
               nn
               OU fl RemttJul Inveaijiiion. Vep Aita. Pueoo Rjeo.
                                                                     FrtlJ Ci§ Q
                                                                                                                     of 14
3»mplc l.D.
(Depth in fl bli)

t •
BH-2S 19J-JIJ
BH-28 24.5-26.5
BH-28 29.5-3 IJ •
BH-28 34J-36.5
BH-2S 39.5-4U
BH-2S 44J-46-S
BH-28 54J-58.5
BH-23 59.5-61.5
BH-28 64.5-66.5
BH-28 69.5-70.2
BH-28 74J-75.2
BH-27 4J-«.5
BH-27 9.5-11.5
BH-27 14.5-16J
BH-27 19.5-21.5
BH-27 24.S-26.5
BH-27 29.5-31.5
BH-27 39J-I1.5
BH-27 44.5-«.5
BH-27 49J-I9.6
BH-27 J4J-54.fi
BH-27 59J-59.7
BH-27 64.5-66.5
BH-27 69.5^9.6
BH-27 74.5-75.4
BH-27 79.5-3 M
BH-27 84.5-86.1
BH-27 89.5-89.7 •
BH-27 94.5-96.5
BH-31 4.5-6.5 •
BH-31 9,5-11.5 •
BH-31 14.5-16.5 *
BH-31 19.5-21.5 •
BH-31 24.5-2S.5 •
BH-3! 29.5-31.5 •
BK-31 34.5-36.5 • i
BH-31 39.5-41.5 *
BH-31 44.5-W.5 •
BH-31 49.5-51.5 »
BH-J1 54.5-56.0
BH-31 59.5-60.2 •
BH-31 64.5-64.6 •
BH-31 69.5-65,6 •
5cff lj]l Dtffft fnr fn*L,~~.,-
Due
Singled

1/14/93
1/14/93
1/14/93
1/14/93
1/14/93
1/14/93
1/14/93
1/14/93
1/14/93
1/15/93
1/15/93
1/11/93
l/IS/93
I/ IS/93
1/13/93
l/IS/93
1/19/93
1/19/93
1/19/93
1/19/93
1/19/93
1/19/93
1/19/93
1/19/93
1/19/93
1/19/93 .
1/19/93
1/19/93 '
1/19/93
1/19/93
1/19/93
1/19/93
1/19/93
1/20/93
1/10/93
1/20/93
1/20/93
1/10/93
1/20/93
1/20/93
1/20/93
1/20/93
1/20/93

Lacilioa

CECP
GECP
GECP
CECP
CECP
GECP
CECP
GECP
CECP
CECP
CECP
CECP
CECP
CECP
CECP
CECP
GECP
CECP
CECP
GECP
CECP
CECP
CECP
GECP
GECP
CECP
. CECP
GECP
GECP
GECP
GECP
CECP
GECP
GECP
GECP
GECP
GECP
CECP
GECP
CECP
GECP
CECP
GECP

1,1-DCE
(ue/kir)
v*»'*fcV
ND
ND
ND
ND
ND
Htl
nu
ND
ND
ND •

ND
ND
wn
f*LJ
wn
fi U
c/c
JO
11
J. J
WP)
riu
ND
w r\
fliJ
lan
r*u
NO
*jTk
nu
ND
ND
ND
ND
ND
ND
ND
24
70
127
1 At
Joj
224
615
32S
340
301
ND
203
1/1
1U
95

lnn»-l,2-DCE
(ug/kf)

ND
ND
ND
ND
%rf«
ND
ND
ND
ND
ND
ND
ND
ND
ND
. ND
ND
ND
ND
ND
ND
ND
ND
ND .
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
TCE
(if/kg)

ND
ND
ND
ND
ND
ND .
ND
ND
64
93
21
60
71
37
124
93
93
73
62
ND
ND
I
212
33
42
296
139
111
ND
43
91
132
260
313
501
910
700
761
646
11
392
23
14)
PCE
Cut/kg)

ND
ND
ND
ND
ND
ND
ND
ND
ND
NP
ND
ND
ND
ND
ND.
ND
ND
ND
ND
ND
ND
ND
ND
ND
' ND
ND
ND
ND
ND
ND
ND
7
15
21
- 39
65
35
49
75
ND
91
7
32

-------
Title   1.
                  ii. ofVol.uk Oiiinic Compound Conwnmtio* Dueled bj H.tJ C«. Chrem«oerlph
             of SoiJ Stmplc. fnm Borehole., WUDCO Indjuriil P.rk. October 1992 W Mirch 1993,
              OU H tUmedul Invutlfitioa. Vej» AJu, Puerto Rico.
Page 9 of 14
Stmplt l.D,
(Depth in ft bli)
BH-31 794-79.7
BHOI 844-15.4 •
BH-31 894-89.9 •
BH-31 944-95.2 •
flH-33 44-64 *
BH-33 9.3-1 1. S'f
BH-33 144-164
BH-33 194-214 *
BH-33 244-1S4
BH-33 294-314 /
BH-33 344-364
BH-33 394-414 *
BH-33 44.5-464
BH-33 494-514 *
BH-33 544-56.0
BH-33 594-614
BH-33 644-664
BH-33 694-714 /
BH-33 744-764
BH-33 794-114 '
BH-33 844-864
BH-33 19 4-91 3 1
BH-33 944-964
BH-30 44-64
BH-30 94-114
BH-30 144-164
BK-30 194-214
BH-30 24.5-26.5
BH-30 294-314 *
BH-30 344-364 • .
BH-30 394-414 •
BH-30 444-«4
BK-30 494-514
BH-30 544-564
BH-30 594-614
BH-JO 644-64.6
BH-30 694-S9.7
BH-30 794-80.2
BK-30 144-864
BH-Kl 894-39.7
BH-25A 44-64 •
BK-1SA 94-114 •
BH-15A 144-164 *.
Sc: !i« pjje for footnote).
Dite
Sampled
1/2 1/93
1/2E/93
1/21/93
1/21/93
I/il/93
1/22/93
1/22/93
1/22/93
1/22/93
1/22/93
1/22/93
1/21/93
1/22/93
1/22/93
1/25/93
1/25/93
1/25/93
1/25/93
1/25/93
1/15/93
1/25/93
1/25/93
1/26/93
1/22/93
1/22/93 '
1/22/93
1/22/93
1/22/93
. 1/25/93
1/25/93
1/25/93
1/15/93
1/15/93
1/25/93
1/25/93
1/15/93
1/25/93
1/15/93
1/15/93
1/25/93
1/27/93
1/27/93
1/27/93

Loeilion
CECP
GECP
CECP
CECP
GECP
CECP
CECP
CECP
CECP
GECP
GECP
GECP
GECP
GECP
GECP
CECP
GECP
CECP
CECP
CECP
CECP
GECP
GECP
GECP
CECP
•GECP
GECP •
CECP
CECP
CECP
GECP
CECP
GECP
GECP
GECP
CECP
CECP
CECP
GECP
CECP
GECP
GECP
GECP

—
l.l-DCE
(uj/kj)
ND
301
292
201
ND
ND
ND
13
20
23
17
48
ND
ND
ND
ND
ND
ND
ND
ND
ND
51
150
ND
ND
16
57
121
379
307
167
67
72
11
13
23
47
45
59
ND
14
ND
15
— ™-™^— — ^^-^^KK.

— — — — — — ,^^^__
irau-M-DCE
(ug/kj)
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
•ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND

*^^^^*^^^^^^^^^m
TCE
(ug/kg)
ND
513
418
486
u
12
32
80
119
142
142
201
31
25
ND
ND
ND
ND
ND
ND
ND
290
936
ND ;
ND
ND
'ND
ND
fil
Q_
86
63
34
34
9
to
5
11
155
137
6
100
56
2:7

PCE
(wg/ki)
™ " 	
ND
jt(
03
jr *
01
31
vr*
"u
ND
i'i/
ND
ND
ND
ND
ND
ND
ND
7
/
ND
ND
ND
ND
ND
ND
ND
11
'38
' ' ND
ND
fciri
NO
ND .
ND
ND
ND
ND
ND
ND
-' ND
ND
ND
N0
ND
. ND
15
ND
' 32


-------
T.ble  4.
              A«lru. ofVcUia, 0,.aic Compound COKcmn(ionj 0,,^ fcy nelj ^ Q,,,       fc
            • of Sod Simplei from Borehole i, PRIDCO Iniuiuul pirk, October 1991 to Mirth 1993
             . OU D Rcmcdul Invcttijilioo, Vejt AlU, Puerto Rico.
Page 10 of 14
Simple I.D.
(Dcpih in ft bl>)
BH-15A I9J-11.5 •
BH-25A 14.3-26.5 •
BH-2SA 19.5-31.5 • 1
BH-15A 34. 5-36. < •
BH-15A 39.5-41.5 '
BH-25A 44.3-43.3 •
8H-Z5A 54.5-56.5 •
BH-25A 59.5-61.5 •
BH-15A 64J-66.5 • 1
BH-2JA 69.5-71.5
BH-J5A 74.3-76.5
BH-25A S4J-16J
BH-25A S9.5-89.7
BH-32 4J-6.S •
BH-3I 9.3-11.5 -
BH-31 M.5-16.5 • *
BH-32 19.5-21.5 -
BH-32 24L5-16.S •
BH-31 29.5.31.5 •
BH-31 3-1.5-34.5 •
BH-31 39.5-41.5 •
BH-32 44J-44.6 •
BH-32 49J-51J •
BH-32 54.S-56.5 •
BH-32 59.5-41.5 •
BH-32 64.5-46.5 •
BH-32 69.5-71.5 •
BH-3: 74.5-74.7
BH-32 77.5-79.5
BH-32 84.5-346
BH-3: 89. 5-90.2
BH-32 94.5-94.6 v
BH-3-1 4.5-5.5
BH-34 9.5-11.5
BH-34 14 j. 16.5
BH-34 19.5-21.5 *
BH-jJ 24.5-C6J •
BH-34 29.5-31.5 *
BH-34 34.5-36.5 *
BH-34 39.5-41.5 *
BH-34 4j.S-tf,5
BH-34 49.5-51.5 #
BH-M 54,5-56.5
BH.;j 59.5-61.5 *
set .j>( p*gc lor rooinoui.
Dile
Simple4
1/17/93
1/17/93
1/17/93
1/17/93
J/17/93
1/17/93
1/27/93
1/27/93
1/27/93
1/21/93
1/28/93
l/li/93
l/li/93
1/18/93
1/2S/93
l/li/93
1/15/93
1/78/93
1/1S/93
1/1J/93
1 /IS/93
1/1J/93
1/21/93
1/18/93
1/2S/93
1/1S/93
1/2S/93
1/1S/93
1/19/93
1/19/93
1/29/93
1/29/93
2/1/93
1/1/93
2/1/93
2.' 1/93
2/1/93
2/1/93
1/1/93
1/1/93
Z'l/93
2/ltfJ
2/1/93
2/1/93

Locition
GECP
CECP
CECP
CECP
GECP
CECP
GECP
GECP
. CECP
CECP
CECP
CECP
CECP
GECP
GECP
GECP
CECP
CECP
CECP
CECP
GECP
GECP
• GECP
CECP
CECP
GECP
CECP
CECP
GECP
GECP
CECP
GECP
CECP
CECP
CECP
CECP
CECP
GECP
. GECP
GECP
CECP
CECP
CECP
CECP

1,1-DCE
(ug/kg)
41
66
308
146
25
ND
4
99
25
31
IS
ND
ND
ND
11
21
70
68
39
910
144
18S
141
14
ND
ND
ND
ND
ND
ND
ND
117
18
34 (
ND
23
67
67
70
ii
1.1
21
54
J^
Kn
i* LJ
ND
iniu. 1,1-DCE

-------
 Tiblc
                A«l)rii. of VoUU
ND .

^4
.3
l!7
PCE
(ug/kg)
ND
wn
FUJ

fl
f
£
V
NH
i^w
ND
Nfl
l*LJ
•J
i
WT\
r
-------
Tiblc  -I.
                   . 0{ VoUul, Ors,mc Compound Co«eiUnuOB1
12 of 14
Simple I.D.
(D«pih in ft bl»)
	 • 	 • 	 ,
1 •
BH-24 4J-6J
BH-24 9J-11J
BH-24 14.5.16.5
BH-24 20.9-22.9
BH-24 14.5-26.5
BH-24 29J-31.3
BH-24 34.S-34.5
BH-14 39.M1.3
BH-24 44J.«.5
BH-24 49.5-50.3 f
BH-24 S4J-56.2
BH-24 5PJ-SOJ
BH-14 64J-64.6
BH-24 74.3-76.5
BH-24 aoj-Sl.g
BU^.4 t t t m * f.
BH-24 S4J-S4.9
BH-24 89.5-91.5 •
BH-24 94 ,3-96 .5
Btr.ifi A e_je <
on-iv ^.J^j
BH-20 9.5-1 1J
BH-IO 14.5-16.3
BH-20 19.3-21 J
BH-20 24J-26J
BH-20 29 .5-31.5
tJ LJ 1ft ' 1 i t * f f
BH-20 34.5-36.5
BK-20 39.5-41.5
BH-20 44.5-46.5
BH-20 49.5-51.3
BH-20 54.5-36.5
BH-20 59.5:6 1 J
BH-20 64.5HS6J
BH-20 69.5-71.5
BH-20 74.5-76.5
BH-20 79.5-81.5
BH-20 84.5-S6.5
BH-20 89.5-91.5
BH-:o 99.5-101.5
BH-:0 106.5-108.5
BH-tO 109.5-111.5

BH-^J 4.5-4,5
BH-U 9.5-1 1 .5
BH-ZJ 14.3-16.5
BH-U 19.5-11.5
BH.^I u < -f *
nn--j .;<.;.. a, j
Sc: liii plge for (bouwei.

Dtlc
Sampled

119193
2/9/93
2/5/93
1/9/93
2/9/93
2/9/93
2/9/93
2/9/93
2/9/93
2/10/93
1/10/93
2/10/93
2/1003
2/10/93
2/10/93
2/10/93
1/10/93
2/10/93

1/24/93
2/24/93
2/34/93
2/24/93
2/24/93
2/24/93
2O5/93
2/25/93
205/93
2/24/93
2/36/93
2/26. 3
2/26/93
2/26/93
2/26/93
2/26/93 •
3/1/93
3/1/93
3/1/93
3/2/93
3/2/93


3/4/93
3/4/93
3/4/93
3/4/93
3/4/93
— — •— ^ -^—_

Location

TDYN
TDYN
TDYN
TDYN
TDYN
TDYN
TDYN
TDYN
TDYN
TDYN
TDYN
TDYN
TDYN
TDYN
TDYN
TDYN
TDYN
TDYN

CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
^r
CP
CP
CP
CP
CP
CP
CP
CP
CP


CP
CP
CP
CP
CP
-^ ^^^_^

1,1-DCE
/uw/t*»k

-------
T«bk ' *.     Aflilytii of Volatile Orginic Compound Concenlniion. Ocueud by
            of Soil S«mplet (mm Bontiolu, PR1DCO bulutuul Put. October 1992 10 Mireh 1993.
            OU D RemaTuI Invc«jf*tion. Veg« Aid, Puerto Rico.
                                                                                                 Page 13 of 14
Simple I.D.
(Depth in ft bli)
BH-n 29J-31.5
BH-23 34.5-36.5
BH-13 39.5-»1.5
BH-D 44J-46.5
BH-13 49.5-51.5
BH-13 54.5-56.5
BH-U 59.5-61.5
BH-13 44J^6.5
BH-23 69. 5-69.fi
BH-13 74.5-76.5
BH-23 &4.5-M.7
BH-13 S9.5-90.3
BH-22 4.5-6.5
BH-22 9.5-11.5
BH-22 14.5-16.5
BH-22 19.5-21.5
BH-:: :4.5-2s.s •
BH-22 :9.S-19.6
BH-22 34.5-36.5
BHOl 4.5-6.5
BHOt 9.5-11.5 •
BH-:: 14.5-16 i
BH-2! 19.5-21.5
BH-:i 19.5-31.5 •
BK-:i 34.5-36.5
BK-:i 39.5-<1.5 •
BK-21 49,5-«9.7
BH-2! 54.5-56.5 •
BH-2: 64.5^56.5 •
SH-I1 69.5-59.7
B:-:-:I 74.5-75.0
BH-:: 70,5-ii.s
Due
Sampled
3/4/93
3/4/93
3/4/93
3/5/93
3/5/93
3/5/93
3/5/93
3/5/93
3/5/93
3/5/93
3/5/93
3/5/93
3/10/93
3/10/93
3/10/93
3/10/93
3/10/93
3/10/93
3/JO/93
3/12/93
3/11/93
3/12/93
3/11/93
3/12/93
3/11/93
3/12/93
3/12/93
3/11/93
3/12/93
3/12/93
3/12/93
3/15/93
Location
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
CP
l.t-DCE
(«»/kg)
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
15
ND
ND
ND
ND
ND
ND
15
ND
14
ND
ND
tnu-!,l-DCE
(iif/lB)
. ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND .
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
, ND
SD
ND
ND
TCE
(ug/Vj)
ND
ND
ND
ND
ND
ND
tro
ND
ND
ND
ND
ND
ND
ND
ND
ND
6 ,.
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
PCE
0»«/kg>
ND
ND
ND
ND
ND
ND
ND
ND
ND "
ND
ND
ND
ND '
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
ND
7
ND
ND
ND
GERAGKTY c MILLER. INC.
                                                                                                              »  *

-------
Tibli   S.
Afl.l)-ti. of VoJ.tJIe Orgink Confound Coneentntioni Dieted by Field C.. Oirem»U)Bfiph
of Soil Simple* from fiorcitolci, PRJDCO Indunrul Pick. Ociobcr 1991 to March 1991
 OU n Xemedut lavcufuioo, Y«g« AJu, Puerto Rico.
                                                                                                               Page U of u
Simple l.D.
(Depth in A bli)
BH-II 84J-S64
EH-21 J9J-9M
BH-II 94J-96J
BH-ll S9J-IOU
Dtlc
SimpluJ
3/IJ/93
3/15/53
3/11/93
3/IJ/93

Loctiloa
CP
CP
CP
CP
U-DCE
(U(/kj)
ND
ND
ND
ND
«r»i»- U-DCE
(«*/k()
ND
ND
ND
NO
TCE
(ugflcg)
ND
ND
ND
ND
PCE
(ug/Vj)
ND
ND
ND
ND
All uulyiei were performed oo I Pbouvte IOS50 porublc f» ehramitognph.
I
ft bit
ug/lj
ND
I.I-DCE
l»n>1.2-DCE
TCE
PCE
FDD
FWC '
JUM
HA
CEPP
CECP
TDYN
CP
we
           Unknown delected with i puk lirntlir to cij-l.J-dichJoroethcnc.
           S*mple jplit tor uulyiii by eoninct Libonicry pregrtm (CLP) Uboniorv.
           Ftst below Uad nirftee.
           Mierojnmj per kilagnm.
           Noidcueted.
           1,1'DfcUoroclhen.
           lnni-1,2-DichlonKibene.
           Trie Woroeih inc.
           TetnchJaroclhcoe.
           Former Dniuge Dileh.
           Former W
-------
T«lilc   1)    Concenlralinm of Volatile Or£«nic Compounds in Granndwoler Snmptcl Collecled from Jiniiary to Mttch 1992, OU II Remedial In veali gal ion, Veg« Alia, Puerto Rico.

Simple ID: Alii Arenit Arcnn ,
n*jura 5
Nur«ry tVnccnrfH Pnx««iJ*i (7)

Afulyie
Chtoromclhnttc
lUiMtturMClhutic
Vinyl cMofidci
Cjil<)f<»cllmnc
Mmliykrtc cMmiilc
A trclotfC
CftftiOrt Jijulfide
] f J . DictiJorudhene
I , 1 • i lii'Jil**riicllin'ic
(l«») " (83) <«)m
Due: 20-J>n-92 20-J«n-9J 10-Jin-92
0.5 U O.S 11 0,5 U
0.511 0.511 O.SU
0 5 11 O.S U 0.5 U
O.S U 0.5 U 0.5 U
0.5 U 0.5 U 0.5 U
111 7 U 2 IJ
OSU 0.5 U O.S U
IS O.S II O.S U
t.n osii o.s iJ
l.2-Uiclilitft»cilieMc(cii/iNU») .3.7 O.SU. O.SU
• dilurr<>cifi*nc
(.'ofliiiii iLincUiidile
tlriiiiiiKli>.liliiriiNicili*iie
!,J.Dkhliliroinin;hl(iiunic[li«ne
1 . 1 .2 TiiLhlnriiulhonc
IJcn^cMtf
tii 1 .3-IJicliluriipriipciiG
Itriiiiiiifiirin
•1 Mtlliyl 2 ('emu mute
',!• 1 JcinJKiiM:
1 , 1 ,2,'J- Tmiit lil'.fi.clliMiic
'1 Ctl*l-Mf*JUClJlCllC
'1 itlllCIIC •
f 'Mi»fii|jcji/ciie
filliyllicjtjcnc
£4yr£nc
\"yli:licl (Inlol)
Analyic cnnccnlnlions in
Analyse! were performed
O.S II O.S U O.S U
05 IJ O.S U O.S U
2 U 2 U 2 U
O.SU O.SU O.SU
O.S U 0.5 U O.S U
O.SU 0.5 U .O.SU
O.I9J 0,5 U O.SU
O.S UJ O.S UJ O.S U/
170 D O.SU O.SU
0.5 UJ O.S UJ 0.5 UJ
O.I6J 0.5 IJ O.SU
0.05 J 0.511 0.511
0.5 11 0.5 U 0.5 IJ
0,5 UJ n.S UJ n S 111
2 UJ 2 UJ UJ
2 II 2 U 2 IJ
0.511 0.511 O.S 11
U.'J 0.5 II O.S IJ
0,5 II 0.5 11 O.S U
0.51) 0.511 O.SU
O.S-IJ 0.5 IJ O.SU
O.S U O.S U O.S U
O.S II OS U O.S U

28-Jin-92
n.su
(1.5 11
o.s u
O.SU
O.SU
2 U
0.5 U
O.S U
O.SU
O.I3J
0.15 J
0.5 U
2 U
0.5 U
O.S U
0.26 J
OSU
O.SU
o.a
0.75
OSU .
0.06J
0.5 U
2.2 UJ
2 II
2U
0.5 U
0.72
1.7
O.S IJ
O.IHJ
O.S U
' 1.8 ' -
DVAWOI02 HV AW 01 03 BVAWOlCH
(Ml)

M-Feb-92
0.5 II
O.S U
O.S U
O.S U
O.S U
2 U
I.S
O.SU
O.SU
O.S U
0.5 U
O.SU
2U
O.S U
O.SU
O.S U
O.SU
O.SU
o.s u
O.SU
o.s u
0.5 U
o.s u
o.s u
2U
2U
0.5 IJ
0.5 IJ
0.5 U
O.S U
O.S U
O.S U
O.SU
microgrami per liter (pirti per billion JpphJ). . ' .
by various analytical inlicuniniclori uirng tlandard U.S. Onvironmcnul
|) .rnm|H)iind concentration waj dciennincit tl i secondary tfilulion
] I'^liriialctl result.

factor.

II . Tim tinniKiiinil WHS uimlyscd fur, Itul not detected III llic corresponding reporting
•1 All it|»n1ni|; liniiu Julinl ilnc in in«iri< iittcffcrcnuci.
i All (ciHiiiitig limili
t< n tn. if icjciJijii
IH 1'iclil iciiWulo til |>
i«iic«l due in hi|;h Icvcli of oilier •nnlylci.
[UVilHll IHIIIIllc.




limit!.


(Ml)

!4-F«b-
O.S U
O.S M
O.S U
O.S IJ
O.S U
1 U
O.SU
0.5 U
o.s u
O.S IJ
O.SU
0.5 U
2U
O.SU
O.SU
O.S 1)
O.S U
O.S U
O.SU
o.s u
o.s u
0.5 U
0.5 IJ
O.S U
2U
2 IJ "
0.5 IJ
O.S U
O.SU
O.S tl
0.5 IJ
O.S U
O.SU
Protection





(Ml)

91 U-Ftb-91
O.SU
O.S U
0.5 U
O.SU
0 J U
2U
1 U
O.SU
0.5 I)
O.SU
O.SU
OSU
2U
O.SU
O.SU
OSU
O.SU
O.SU
O.SU
O.SU
o.s u
o.s u
o.s u
o.su
2 IJ
2U
o.s u
o.s u
o.s u
0.5 U
o.s u
0.5 U
o.su
&VAWOIOS
(MIJ

l4-Fcb»
O.S U
O.SU
O.S U
0.5 U
O.SU
2 U
1 U
0.5 U
O.SU
0.5 U
O.SU
O.SU
2 U
O.SU
O.SU
O.S U
O.SU
o.su
o.s u
o.su
O.SU
o.s u
o.s u
o.s u
zu
2U
0.5 U
0,5 U
o.s u
0.1 U
o.s u
o.s u
0.5 U
BVAWOI06
(Ml>

H Fcb-92
0.5 U
0.511
0.5 tl •
O.SU
O.S U
2 U
I.I U
O.SU
0.3 U
O.SU
O.S U
O.SU
2U
O.SU
o.su
o.su
o.su
o.su
o.s u
o.s u
o.su
0.5 U
o.s u
o.su
2U
2 U
o.s u .
o.s u
O.S IJ
o.s u
0.33 J
0.3J J
O.SU
nv AW oi 07
(Ml)

l8-Fcb-92
O.SU
O.SU
O.S U
o.s u
o.s u
2 U
0.7t UJ
O.SU
O.SU
O.SU
o.su
o.s u
2 U
O.SU
O.SU
o.s u
o.s u
o.s u
o.s u
o.s u
O.S II
o.s u
o.s u
o.su
2 U
2 U
0.5 U
0.5 U
0,06 J
O.SU
0. II J
o.s u
o.s u
BVAWOIOJ
(Ml)

lt-Fcb-92
0.5 U
0.5 U
O.S U
O.S U
O.SU
2U
O.SUJ
o.su
O.SU
O.SU
O.S U
O.S U
2 U
O.SU
o.su
o.su
o.su
o.su
o.s u
o.s u
0.5 U
o.s u
0.5 U
o.s u
2 U
1 J
0,5 U
OS U
0.27 J
o.su
0.85
O.J7J
O.I7J
BVAWOI09
(Ml)

ll-Feb-92
O.SU
O.S U
0.5 U
0.5 U
O.SU
2 U
2.4 UJ
O.S IJ
O.SU
O.SU
O.S U
0.5 U
2 U
0.5 U
0.5 U
O.SU
O.SU
O.SU
O.SU
O.S U
O.S U
o.s u
o.su
o.s u
2 U
2 U
0.5 U
O.SU
O.SU
0.5 U
1
0.86
OOSJ
BVA
(Ml)

n-r
o.s
0.5
0.5
o.s
O.i
2 t
o.a
o.s
o.s
o.s
o.s
0.5
2 1
O.S
O.S
O.S i
O.S 1
0.5 1
0 44
O.S I
OS 1
0 S 1
0 5 1
0 S t
2 ir
2 U
0,5 1
0 J2
051
0,5 (i
1.2
0.74
O.S tl
Agency mtlhadology.




































-------
  T*   ,
                               „,«.„,. 0^ c^,,,,, „ <,„„„„„„„ ,.„„,„
                           S.mplelD; BVAWOMI nVAWOlll UVAWOII2  BVAW 0113 BVAW 0201 BVAW 0202  BVAW0103  BVAW 0204  BVAW 0204  BVAW 0205 BVAW 0706 BVAW 0107  BVA\
                                     (Ml)        (MDFR    (Ml)         (Ml)                (M?) FR     (M2>        2    H-Fcb-92     6 Mir-92     fi-Mir-92     9-M.r-!>2    J-Mir-92    9-M.i-M    9-Mif-92    IO-Mir-92    |t>Mir>91
	 	 	 , — —
Cliliironiclhnne
I'runutmcihftiic
Vinyl cMnriilc
Ctili.rrjcllmnc
Mdliykijc clilnridc
Al'CIDHe
(.'iilinn Uijglfidc
1,1-1 Jicliliirncihcnc
1,1 liiclili.ii, illume
1 .? UicUfiHjtllicnc (civ/Muni)
riildfofnrm
1,? l>idilurii<>ilielilt>n>mei|i«nc
1 ,?-Dicliloiuprup*iK
irujii-l.l-Ukliloropruncitc
ffichhiriielhcilc
I titi niiniiL'lilurunictlwnc
1 . 1 .2-Tf klilorocilnne
ttmitcnc
til- i ,3-l.liclilcjriipriipcnc
Ilrnitinriiiin
•1 Mclliyl-2 pciilnniine
2-lfciall'inc
1 , 1 .2,2-Tclr*cliIijri>c1liiinc
t CflbcMllSdClhetlC
1 !•! licit f
'('li\tittthi:tiicnc
I:il>yllicir/ciic
.'iiyicnc
\>lcnci (Inlnl)
0.5 U
O.S ||
0 5 II
0.5 U
0.5 U
2 \l
1A UJ
1.8
1.)
l.<
0.56
O.iU
31J
0.5 U
0.5 U
0.5 U
OH 1
0.5 U
15
O.SU
0.5(1
0.5 U
0.5 U
0.5 tl
2 II
2 II
».S U
"/.'/
0.13 J
0.5 U
n.]7 J
O.OB J
O.I9J
0.5 U
0.5 U
0.5 tJ
0.5 (1
0.5 U
2 U
2.20J
1.9
1.2
I.I
0.51
05 U
2U
0.5 U
0.5 U
O.I J
O.I2J
0.5 U
16
0.5 U
O.SU
0.5 U
0.5 U
0.5 U
2 U
2 U
O.SU
7.8
0.11 J
0.5 U
O.I6J
0.06 J
0.21 J
0.5 U
0.5 U
0.5 11
O.SU
O.SU
iu
0.5 U
0.5 U
O.N J
2.3
O.SU
0.5 U
2 U
0.5 U
O.SU
0.5 U
O.SU
O.SU
O.I J
0.5 U
O.SU
0.5 U
O.SU
0.5 U
2 U
2 U
0.5 (J
0.09 J
0.6) U
0.24 J
2.3
2.1
0.5 U
0.5 U
0.511
O.S U
0.5 U
0.53 U
2 U
0.5 U
0 60
0.48 J
1 2
O.I J
0.5 (I
2 U
O.SU
O.SU
O.SU
O.SU
O.SU.
4.6
0.5 U
O.SU
O.5 U
0.5 U
O.S U
2 U
2 11
O.S U
II
O.S U
O.SU
0.3J J
0.23 J
0.5 U
O.S U
0.511
o.s u
O.SU
0.82 U
2 U
0.5 U
O.SU
0.5 U
0.5 U
0.5 U
O.SU
2 U
0.5 U
O.SU
O.SU
0.5 U
O.SU
O.SU
O.SU
. 0.5 U
0.5 U
O.SU
o.su
21J
2 U
0.5 U
0.5 tl
0.5 U
O.S U
0.5 U
O.S U
0.5 U
O.SU
0.5 U
O.S U
O.SU
O.SU
2U
O.SU
0.5 U
0.5 (1
O.S U
O.SU
O.SU
2U
O.S U •
0.5 U
O.SU
O.SU
O.SU
O.SU
0.5 U
0.5 U
0.5 (J
O.SU
0.5 U
2 U
0.6S )
O.S U
o.s u
O.S U
O.S U
0.001
O.S U
0.5 U
	 	 -
0,5 U
0.5 II
0.5 U
0.5 U
O.S U
2U
O.SU
O.SU
0.5 U
O.SU
O.SU
0.5 U
2 U
0.5 U
O.SU
O.SU
O.SU
O.SU
O.I3J
0.5 U
O.SU
O.SU
0.5 U
0.5 U
2U
. 211
0.5 U
O.S U
0.5 U
O.SU
0.5 U
0,5 U
0.5 U
0.5 U
0.5 U
O.SU
0.5 U
O.SU
2 U
0.5 U
4.7
O.I J
0.12 J
. 0.5 U
0.5 U
2U
O.SU
O.SU
O.SU
O.SU
O.S U
9.6
o.iu
O.SU
0.5 U
O.SU
O.SU
2U
2U
O.SU
0.08 J
O.S IF
0.5 U
O.S U
O.S [J
0.5 U
•u.
O.SU
O.SU
0.5 U
O.SU
O.SU
2U
O.SU
4.8
0.06 J
0.121
0,5 1;
O.S U
2U
0.5 U
O.SU
O.SU
0.5 U
O.SU
9.9
O.SU
0.5 U
O.S U
O.SU
O.SU
2U
1 U
0.5 U
O.OSJ
0.5 U
O.S U
O.S U
O.S U
0.5 U
•• 	 —
O.SU
0.5 (I
0.50
O.SU
O.S U
2U
O.SU
29
0.79
0,82
o.is;
O.I6J
2U
O.SU
O.SU
O.S U
0.47 J
O.SU
56 D
O.SU.
0.22 J
O.S IF
O.S U
O.SU
2 U
2 U
0.5 U
O.S
0.5 U
O.S U
0.21 J
0.5 U
0.26J
• 	 	 	 — —
—^^^™— •
I.2UJJ
I.2U
1.2 U
I.2U
1.2 U
SU
I.IUJ
32
0.82 J
I.I J
1.2 U
1.2 U
SU
1.2 U
1.2 U
1.2 U
1.2 U
I.2U
70
1.2 U
1.2 U
1.2 U
J.2 U
1.2 U
SU
5 U
1.2 U
0.6 J
1.2 U
1.2 U
1.2 tl
1.2 U
1.2 U
	 	
1.1UJJ
I.2U
1.2 U
1.2 U
I.2U
SU
I.2UJ
28
0.7 J
I.I J
1.2 U
1.2 U
SU
1.2 U
I.2U
1.2 U
1.1 U
1.2 U
58
1.2 U
1.2 U
1.2 U
).2 U
1.2 U
SU
5 U
1.2 U
0.45 J
1.2 II
I.2U
1.2 U
1 2 U
I.2U
-^— ' 	 	
1 111!
Ill
1 D
1 II
1 U
4 11
1 IU
27
0.83
1
1 tl
1 (1
4 [1
1 II
1 U
1 U
052J
( U
65
1 U
1 U
j u
1 II
1 11
4 (I
4 II
1 11
0 id j
1 tl
t 11
1 tl
1 If
J tl
Anulylc cnnccnlralinni in mtcri>(jrunij per liler
Analyses were pcrforiilcij liy vanouj ftiiilyiical
                                                       hitlin
                                                                          U.S. Environ™,,. Premier, Agency mc,hodo,o£y,
                                                                     f.clor.
                        >i umily/eil for. hut nnl dtlecieil il I he
• I      All icj-irlin|; fiinin miicil line In inilfii Jiilci fcrcncci.
•       All itiniiiittj: liinin luiitd iliic In liij;li Icvcli ilf nlliLr minlylci.
|(      ItctiiU ititultd.
I'll    (icM icplitnlc uT prcvinni ittnple.

-------
Table  0    Concent rat inni rtf Volatile Organic Compound) in Grounilwater Simples Collected fmm January ID Mircli 1992, OU II Remcdiil Inveiiigilion, Vcgt All*. Puerto Rico.
                                                                                                                                                                Pi,
                            in; TIVAW MCI DVAW 0301 nvAW ojoi RVAVVOJCM RVAWOJOJ  IWAWOSM  BVAW 0107  DVAWOJOI pvAWOint BVAWWOJ BVAWMO)  BVAWOMVI  uw
                               (Ml)      (MJ)      (MJ)       r-92   !7-M«r-«  |7-M»r-92   1 7 Mir 91   I7-f»ftr-92    )7-Mir-92    17 M.r-92   U Mir 91   l8-M«r-91   ll-Mir-92   lt-Mir-92
                                                                                                                                                       Mtr-91   II-K
OiloruinciJikHc 0.5 IJ O.S If 5 U 0.5 U
Hmimrinvlliinc 0.5 U O.S U 5 U 0.5 U
Vinyl cliloriiic 0.5 U O.S U 5 U 0.5 U
Clilnrucilunc 0.5 U 0.5 U 5 U 0.5 U
Mcihylcdcclilnritlc 0.24 J O.S U SU O.SU
ActJr.nc 2U 4.1 30 U 2U
Cirliun ilisulfirup*iie 0.5 U 2 4.SJ 5.3
Ifdiii l.3-Djtlil»ru|irapcne ' O.SU O.SU 5U O.SU
TfKMuiueihcnc O.I8J 50 D 350 D 290 D
tJ.htoniocMofomtiliBne 0.5 U 0.5 U 5 U 0.5 U
I.l.2-Triclilur»clh«i« O.S IJ 0.5 U SU O.SU
litnicnc . 0.5 U O.SU SU 0,5 tJ
cilri.J-DiclilciKinrnncnc O.SU 0.5 U SU O.SU
Iti unto fix m O.SU 0.5U SU O.S U
4 Mulhyl : (icnliui'inc 2 IJ 2 U 20 U 2 U
MlexatK.nc 2.9 2.2 20 tl 1.3 J
1.1,3,2 •TcitnL-liliirncilinne 0.511 0.5 U 5U 0.5 (J
Itlruihl-.nitllitiic 0.5 IJ 2.H 0.8 4.4
•fi.lucrie O.SU O.SU 5U 0.5 U
OilnrulicnZEfic 0,5 U 0.5 U 5 U O.S U
niliylhciKciw . . 1 0.5 U 5 U 0.5 U
Siyrene 1.5 O.SU SU O.SU
Xylciics flolal) 0.07 / 0.3 IJ > 5 (J 0.5 U
Anilyte concenlrtlions in micrngnm* per |i(er (pant per billion fprth|).
Analyse* were jxr/iirmed hy vtnoiri antlylical tuliconl melon using siamlinl U.S.
(J (.'(impound concent nil inn wnj determined m i jeconifiry dilution fudnr.
J t'siimtlcd result.
0.5 If
0.5 If
0,5 U
0.5 U
O.SU
2 U
0.5 U
3
0.93
'2
0.3 J
0.5 U
2 U
0.5 U
O.SU
O.SU
. 4.5
0.5 U
240 D
0.5 U
O.I9J
0,5 U
0.5 U
0.5 IJ
2 U
5
0.5 U
4.2
0.5 U
0.5 U
0.5 tl
0.5 U
O.S U
Hnvtronmenul

O.SU
O.SU
O.S U
O.SU
0.5 U
2U
O.S U
0.89
0.23 J
2.8
0.12 J
O.SU
2U
O.SU
O.S U
O.SU
1.5
O.SU
5ID
O.S U
0.5 U
0.5 U
0.5 U
O.S U
2 U
2 U
0.5 U
1.2
0.5 U
0.07 J
0.5 U
O.S If
O.SU
Proiccltnn

O.SU
0.5 IJ
O.S U
O.S U
O.SU
2U
0.5 U
5,3
0,54
1.8
0.11,1
O.S U
2U
O.SU
O.SU
O.SU
3.9
0.5 U
25
0.5 U
O.S U
O.S U
0.5 U
O.S U
2 U
J.2J
o.su
3.6
0.5 U
O.S U .
0.5 If
0.5 U
0.5 U
O.S U
O.S 1)
O.SU
O.SU
0.5 U
2U
O.JU
1.31
0.28 J
1.2
0.13J
O.SU
2 U
0.5 U
O.SU
O.SU
3.54
O.S U
II
O.SU
0.5 U
O.S U
0.5 U
O.S U
2 U
1 6J
0.5 U
1 **
o.s u
0.5 U
0. 12 J
O.S U
0.67
O.S U
0.5 U
O.SU
0.5 U
O.SU
2 U
O.S U
2J
0.44 J
1.8
OJ9J
O.SU
2 U
O.SU
O.SU
O.SU
4.7 J
O.SU
17
0.5 U
O.S U
0.5 U
0.5 U
0.5 U
2 U
2 U
0.5 If
1.7
0.5 U
O.S U
0.12 J
0,5 U
0.66
1,1
0.5 U
0.5 U
O.SU
0,5 U
1 UJ
0.5 UJ
1.2
0.53
4.4
o.ia;
O.S U
2U
O.SU
0.5 U
O.SU
1.5 J
O.S U
5BD
O.SU
0.5 U
O.SU
O.SU
0.5 U
2 U
2 U
0.5 U
1-8
0.5 U
0.5 U
0.5 11
0.5 U
O.S U
0.5 U
O.SU
o.su
O.SU
0.5 U
2UJ
0.5 UJ
1.2
0.58
4.6
0.18 /
0.5 U
2 U
O.SU
O.SU
O.SU
1.6
O.SU
54 D
O.SU
0.5 II
0.06 J
0.5 U
O.SU
2 tJ
2 U
0.5 If
2
0.5 U
0.5 U
0.5 U
0.5 U
O.SU
0.5 UJ
0.5 U
O.S U
O.SU
O.SU
2U
0.5 UJ
1.8
0.61
5.6
0.5 U
0.5 U
2U
0.05 J
0.5 U
O.SU
1.9
O.SU
55 D
0.5 U
0.5 U
0.06 J
O.SU
O.S U
2 U
2U
0.5 U
3.2
0.5 U
O.S U .
O.SU
0.5 U
O.S U
0.5
O.i
0.5
0,J
0.5
2 1
0.5
04
00
1.!
01
05
2 1
OS
O.S
0.5
091
Q 5
18
0.5 1
0.5 t
0.5 1
0.5 t
os i
2 U
2 II
0.5 t
1.1
0,5 1
0.5 I
O.S 1
0.5 1:
0.5 Ll
Agency methodology.







II "Die coiiifMiiiii't wui srulyyed Tor, liul not ilciectcJ it (he cnrreirmniltnc reporting limits.
.1 Ait ic|Miiliiij; limit* ruiscd itnc (» in»lri« iiilcrfcrtiico.
j All it inn lint' limit* r*i>ci| ilnc In lii|;li Icvcli of dilicr unilylci.
11 ktiiill rciei:lc
-------
TflMc   0    Concentration! of Volililc Organic Compound* in Groitndwaicr Sample* Collected from J»nu«ry to March 1992, OU II IlemedUl Invciljgalion, Veg« Alii, Puerto Rico.
                                                                                                                                                                      !Y
                       Stnwlc ID: 11V AW 0406 BVAW M07 DVAW W08 BVAW04W  DVAW04IO  DVAW04M  BVAW 0501 BVAW OiOl  BVAW 0502  DVAW0503 BVAWOJCM BVAW 0505  BV.
                                (MA)       (M4)                      (MS)        (MS)       (MS)        (MS
 Arulylc
                       Due:
IIM.r-92  II-M*r4)   IJ-Mir-91   11 Mir-92   ll-M.r-91   U-M.r-92
                                                                                                              2-M»r-92   ll-Fcb-92    2-M.r-«   2 Mtr-«    2-M*r-92   711
ChJnrnmellianc
Itr'iiiiciinciliaiic
Vinyl tlilofidc
Clilurneiliane
Mcihy lenc cliKuide •
A -iluiie
Curium diiulfide
1 , 1 •Pkliliirocilicnc
I.I fliulilninclliuic
I.J-DicMnrneiliciic (cii/ln
Olilitfiif' irfn
t ,2 'l^iclil'irocllittlie
2 • Ituluniinc
1 .1 4 l>Trkli1ufocfhii>ti
Cirliun icKicliloriile
[!rmi>oJi<.lilnramtlhiinc
l,2-Dichl(>ri)flff)|innc
i ruif - 1 , j • DiOiluroprupcne
Tricfil'ifiictltcfic
Dil>f 1*1 rioi'li lurainetlunc
1 . 1 ,3-Tr ichlornciti»n«
llcnjcuc
ck- 1 ,3-nichlornpropene
ftrunHifo/iri
•J Mclhyj'2-|lefjlnltillic
3-1 Icxttjtonc
1 . 1 ,2.2-Teifacliliiriiclliftjie
Jcirnclilftructljtnc
'1 idiicnc
nijur'il>cii/enc
Klliyjlicn/tne
!> Cuinrxjuiiil crmccnlrilinn wn determined >l i icconiiury dilution
fuclnr.
If Tlic cnuifMtuiiil wni inply/cd fur, linl nn| iltltcleii nl llie cnrrc»ponilinf> reporting
it All n;|>iii1iii|: limit)
i AM rcixiilini; limili
U Utiiilf rejected.
fined due to iitulru interferences.
ni>al ihie l» liiiji level* of oilier nnnlylet.





timid.



O.SUJ
0.5 U
O.S U
O.SU
o.s u
2tl
O.SUJ
o.su
0.08 J
0.26J
O.SU
O.SU
2U
O.SU
O.SU
O.S U
0.15 J
0.5 U
2.7
O.SU
0.5 U
O.S U
O.S U
0.5 U
2 U
2U
0.5 U
O.ll J
O.S U
O.S U
0.5 M
O.SU
0.5 U
O.SU
O.JU
O.S U
O.S U
O.SU
2 U
O.SUJ
O.S U
0.5 U
O.SU
O.SU
.0.5 U
2 U
0.5 U
O.SU
O.SU
0.5 U
O.SU
O.S U
0.5 U
0.5 U
0.5 U
O.S U
O.SU
2U
2 U
0.5 U
0,5 U
0.5 U
O.S U
0.26J
O.S U
0,83
O.SU
O.S II
O.SU
0.5 U
0.5 U
3U
O.S U
0.5 U
O.S U
O.SU
O.SU
0.5 U
2U
O.SU
O.SU
O.SU
O.S U
0.5 U
O.SU
O.SU
0.5 U
0.5 U
O.SU
O.SU
2U
2 U
O.S U
O.S U
o.s U
0.5 U
0.23 J
0,5 U
0.85
O.SU
0.5 U
0.5 U
0.5 U
0.5 U
2U
0.5 U
O.S U
0.5 U
0.5 U
O.S U
0.5 U
2 U
0.5 U
0.5 U
O.SU
0.5 U
O.SU
O.U
o.s u
0.5 U
0.5 U
O.SU
0.5 UJ
2U
2 U
o.su
O.J 11
O.J U
0.5 U
1.2
1.8
0.05 J
O.S U
O.S U
0.5 U
O.SU
0.5 U
2U '
O.SU
O.SU
O.SU
O.SU
0.5 U
0.5 U
2 U
O.SU
O.SU
O.SU
O.SU
O.SU
0.22J
o.su
O.SU
0.5 U
O.S U
0.5 U
211
2 U
0,5 U
O.J II
O.J U
O.S U
1.9
3.6
0.17 J
O.JU
O.JU
0.5 U
O.J U
O.S U
2U
O.S U
o.su
O.S U
O.SU
0.5 U
o.s u
2 U
0.5 U
O.SU
o.su
0.5 U
O.S U
0.64
O.SU
O.S U
o.s u
o.s u
0.5 U
2 U
2 U
O.S U
0.5 El
0,5 U
O.S U
0.41 J
069
0.06 J
O.SU
o.su
0.5 U
0.5 U
O.SU
2 U
0.5 U
0.67
O.SU
0,8
0.09 J
0.5 U
2U
0.5 U
O.SU
O.SU
0.86
O.SU
IS
O.SU
0.5 U
O.SU
O.S U
O.SU
2 U
2 U
0.5 U
0.08 J
O.S U
0.5 U
O.SU
O.S U
O.S U
0.5
O.J
o!j
0.)
1
0.!
O.J
OS
oo
01
2 1
O.i
O.J
O.J
Ob
O.J
9.7
O.i
O.J
0 J
O.J
05
211
2 11
O.i i
0.5 1
O.J 1
O.J 1
O.J )
O.J I
O.J)
Protection Agency methodology.








































1 t( PicU rejilicilc of prcviniu iimplc.

-------
Tiiilc  9     Concenlmlionj of Volatile Orginic Compound* in Groiimlwaler S*mptei Collected from Janii«ry lo M«reh 1992, OU II Remediil Invcjtigilion, Vtg» Alu. Puerto Rico.
S«.imk ID: HVAWOJ07 HVAWOS08 DVAWOS09 DV AW 05 10  BVAW060I  BVAW0602  BVAW0603  BVAW0604
          (MS)       (Mi)       (MS)       (Mi}        (M4)        klii<)fi>etli«iie O.S II 0,5 IJ
t!2-UitMiircicll>enc (cis/lrons) 0.47 J 0.231
riiliiHifiirjii 0.07 ) 0.07 1
1.2 lJitJ.li)iit-l,3-lJiclilariipriipeiii: O.SU O.SU
Triclilnriwllicnc 9.8 5.4
OilirOmuchlurometliane • 0.5 U 0.5 U
1 1,3 Tfidil.itrtciliune O.S M O.SU
lltiiKcric 0.5 U O.S U
cii-I.S-nichJnronropene O.SU O.SU
rir»ni»fiirin 0.5 t) 0.5 U
4 Mtlliyl 2 junluiKnie • 2 IJ 2U
Mlcjuilnric 2U 2U
1.1.2,2 Ttlf.Llil.irntllinit O.SU 0.5 U
Tirlraelitiiroclliciic 0.5 IJ 0.5 U
liiluenc 0.5 U ' O.S U
rhltinilicflrcnc 0.5 IJ 0.5 U
I'idylhciuciic 0.5 U O.S U
Slyien" 0.5 U O.S U
X'ylcitei (until) 0.5 U O.S U
0.5 U
0.5 U
0.5 U
0.5 U
0.5 U
2 U
O.SU
0.5 U
O.S IJ
O.SU
0.5 U
0.5 U
2 U
O.SU
O.SU
0.5 U
O.SU
0.5 U
0.7
O.SU
o.s u
0.5 II
O.SU
0.5 IJ
2 U
2U
O.SU
0.5 U
O.S U
O.SU
O.S U
O.SU
O.SU
0.5 U
0.5 U
0.5 U
O.SU
0.5 U
2 U
O.SUI
0.5 (1
0.5 IJ
O.SU
O.S U
O.SU
2 U
O.S U
O.SU
O.S U
O.SU
o.s u
o.s u
O.SU
0.5 U .
0.5 (J
0,5 U
0.5 UJ
2 IJ
R .
0.5 IJ
O.S U
0.5 U
O.SU
O.SU
O.SU
0.5 U •
O.SU
0,5 U
0.5 U
0.5 U
O.S U
2 U
0.97 U
0.5 U
O.S U
O.SU
0.5 II
O.S U
2 U
O.S U
O.S U
0.5 U
0.5 U
O.SU
0.5 U
O.SU
0.5 U
0.5 U
0.5 U
0.5 U
21)
2 U
O.S U
0.5 U
1 ">
oTu
S.9
14
1.2
Anilylc concentnlinni in micraenmi per liter (Mrti per billion Jpphl). ..-•_'.
Aiinlytci were perfrinncil hy various •tiilylicul lulwonlnclon using slindtrd U.S. Envtronmenlnl
1) Compound canccnlnlion w*t determined tl * iccond»ry dilution
j f*iiimiilefJ result. '
factor,
1 1 1 he o.m|x>iin
-------
T«Me  9     Concentration* of Volatile Orginic Compound! in GroirntIw*lerS»mplei Collected from Janutry la March 1992. OU II RcmcdUl Investigation. Veg» Alii. Puerto Rico.
Simple ID: BVAW 0609 BVAW 0610 BVAW Q«0| BVAW 0802

• Aiulyle Oil«:
Cliloromciliinc
Itfiiiiiutnclhenc
Vinyl chloride
Qiluriicllinnc
Mclliylenc chloride

l^Mtlnifi disulfiilc
l,|.Dicliln«icllitnc
1 .2-i)icMiifiic(|ieiic (cii/irini)
Chin iiftirm
1 I'Dicliluiocllianc
^*0
1 . 1 . 1 'Tf ithloroethafte
Cirliim Icirieliloridc
(Jroinniliirliluriimclliine
l,2-Dicliti>ri>p/y vinous inifyiicil subcontractor! uiing ilindird U.S. Environmental Prelection
I) Compound concentration w» determined •! i secondary dilution
J ItKiiinkictJ result.
factor.
1 1 The compound w«i inilyied fnr, lint not itcleclcJ tt Hie corrcipontling reporting
.1 ' All (cpHting liniiu miul due In matrix interference!.
i All letmniliK limit I (•iicil due to high level) of ullief int.ylct.
II lletull fcjecfcit. • •
l;l( Tielil rcplic*tc of previnni
tiinplc.


limiii.




3.5
0.67
2.3
O.ISJ
O.SU
2U
0.5 U
0.5 U
05 U
O.SU
O.SU .
91 D
O.SU
O.SU
O.S U
O.SU
O.S U
2 U
2U
O.SU
4.4
0.5 U
0.5 U
O.SU
O.SU
O.SU
(K
-------
Tthle   9    Concentration! of Volatile Organic Compounds in GroundwalerSnmptci Collected from J*nu*ry lo March 1992. OU 11 Remedial Investigation, Vega Alii, Puerto Rico.


                       Simple in: nvAW 00ft] nvAW 0901 BVAW 0902 flVAW 0903  DVAW 0904 DVAW 0905  DVAW 0906  BVAW 0907 DVAW 0908  BVAW 09M  BVAW 0910  BVAW 1001  BV/
                                 (M'J)       2   5-M.r 92    5 M.r 92    5-Miiii.incllmne 0.5 11 0.5 tl j 11 0.5 U
Vtnyl chlorMc 0.5 U O.S II 5 tl 11.511
Clilnmcilianc 0.5 U 0.5 U 5 U 0.5 tl
Meiliylcnc cliliiriile O.SU O.SU SU O.SU
Aftiniic 2 U 2 U jn II 2 U
C«|HJII Jiiulfidc 2.2 I.7U 5 Ul 0.5 Ul
'I 1 l)Kl.|[>r»tkliliir«clhm>e (Jill 0.511 2.4 J 1.8
t,2 •l>kbliii»clliciic(ci»Aiint) O.SU O.SU M 9.1
ClilnmUin 0.5 U 0.5 U 5 U 0.5 U
1,2 -DuMntnethnnc 0.511 O.SU SU O.SU
2 •HiiiKiiujie 2U 2tl 20 U 2U
I,!,l-T(itlilof0£(l,ine 0.511 O.SU 5U O.SU
C.ibun ictricliliiride O.SU O.SU SU O.SU
llrc.iniiJicMornineihinc 0.5 U 0.5 U 5 U 0.5 U
1,2 -Dichlnranninanc 0,5 II O.SU 4.IJ 3
irnni l,3.r)Klilur»|ifnpeite 0.511 O.SU 511 O.SU
InclilKri.cilicj.c 0.141 0.131 250 D 260 D
Ditiraniiichluromcdiane 0.5 U 0.5 U 5 U 0,5 U
1.1,2 Trichlutndliunc O.SU O.SU 511 0.24 J
lien/cue 0.511 O.SU SU 0.5 tl
til 1 ,3 •Dichluriinrnncnc O.SU 0.5 U 5 U O.SU
llrr.iFMif..rm 0.5 U 0.5 U 5 UJ 0.5 Ul
^ Mciliyl 2 (icniiimmc , 211 2 U 20 U 2 U
1
MI.ni.Mi.itc 2 U 2 U R R
1.1.2.2-T^mcliliiriicllidiic 0.511 0.5 U 511 O.SU
Ui(Bi:liWi.cihcjic 0.5 U 0.5 11 7.2 5.9
Toluene O.S tl 0.5 U 5 U OS U
Cliliifiilicnicne 05 U 0.5 U 5 U 0.5 U
1 tliyll.ci./ciie I.2J 0.75J 5U 0.5 U
Siyrcflc 2.5 J I.5J 5U 0.5 U
Xyknei (mini) 0.05 J 0.5 U 5 U 0.5 U
0.5 U
0.5 U
0.5 II
0.5 11
O.SU
2 U
0.5 UJ
5.4
1.5
8.9
O.SU
O.SU
2 U
O.SU
0.5 U
0.5 U
2.6
0.5 U
280 D
O.SU
0.5 11
0.5 U
0.5 U
O.S UJ
2 U

R
0.5 U
6.4
0.5 U
0.5 U
0.5 U
O.SU
0.5 U
An*{yic canccnlrvijont in rnicrogrami per liter (j»rts per billion |ppli]). • '
Arulyici were per/irrrned by vnriniif analytic*! itilicnmnclors using standard U.S. nnvironmcnlal
|) Cdtnfrtliml concentration wax determined at • secondary dilution factor.
i (•siimtlcil result.
II The lUiiniNionil wni uiinlyycil for. (ml not delected *l the cnrrcipondino reporting
,1 All ii:|«iilili); liltlili iHljtd itnc In itiillix itilcifriciitcs.
i All iciKirtiiii' limili luiictl ilnc In lii|;h Icvclj ufolhcr anilylei.
U - |te«iiU rcittlcjl
1 H t:klil rc|iltvnK "' previiini »ui|)lc.

limits.



O.SU
0.5 U
0.5 U
0.5 U
0.5 U
2 U
0.5 Ul
5.8
1.7
9.5
0,38 J
O.SU
2U
O.SU
O.SU
O.SU
2.9
0.5 U
300 D
O.S U
O.SU
0.06 J
O.S U
O.S UJ
2 U

R
O.SU
ti.8
O.S U
O.SU
O.SU
O.SU
O.SU
0.5 U
O.SU
0.5 II
O.S U
0.5 U
2U
O.S UJ
4.2
1.5
a.g
O.SU
O.SU
2U
O.SU
0.5 U
O.SU
2.7
O.SU
220 D
O.SU
0. 19 J
O.S U
O.SU
0.5 UJ
2 U

R
O.S U
5.2
0.5 U
0.5 U
0.06 J •
0.5 U
0.31 J
O.SU
0.511
0.5 U
O.S U
O.SU
211
0.5 UJ
5.3
1.6
8.6
O.SU
O.SU
2U
O.SU
0.5 U
0.5 U
2.7
O.SU
320 D
OJ U
0.511
O.SU
0.5 U
0.5 UJ
2U

R
0.5 U
6.1
0.5 U
O.S U
O.SU
0.5 U
O.SU
O.SU
0.5 tl
O.SU
O.SU
O.SU
211
0.5 UJ
. 6.4
*>
10
0.3J
0.5 U
2 U
O.SU
O.SU
O.SU
3.3
0.5 U
280 D
0.5 U
O.SU
0.5 U
O.S U
0.5 UJ
2 U

3.61
0.5 U
7.8
O.SU
O.SU
O.S U
O.SU
O.S U
o.su
0.5 U
o.su
0.5 U
0.5 U
2 U
0.5 UJ
1.3
O.I8J
4
0.2 J
O.SU
2U
O.SU
O.SU
0.5 U
3.8
0.5 U
93 OJ
O.SU
0.5 U
0.5 U
O.S 11
O.S UJ
2 U

R
O.SU
1.1
0.5 U
0.5 U
0.5 U
0,5 U
0.5 U
0.5 U
0.5 U
0.5 U
O.S U
0.7 U
1.2 J
O.SU
17
0.18 J
0.11 J
O.SU
O.SU
2U
0.5 U
O.S U
O.SU
0.3 J
0.5 tl
t i
o'i'u
0.5 U
0.5 U
0.5 U
0.5 U
2 U

2.4
O.SU
0.071
O.SU
O.SU
0.5 U
0.5 U
0.5 U
O.SU
O.SU
0.5 U
O.SU
0.5 U
2U1
0.5 UJ
0.5 U
025J
0,5 U
O.SU
0.5 U
2 U
0.5 U
0.5 U
O.SU
O.SU
0.5 U
0.74
0.5 U
O.SU
0.511
0.5 U
O.S UJ
2 U

1.9 J
O.S U
0.5 U
0.5 tl
O.SU
0.3 J
0.42J
0.47 J
O.S
O.i
05
05
OS
2 1
OS
1
1.
0.)
O.I
O.S
2 1
OS
OS
05
0.5
05
27
O.J
0.5
0.5
0 5
OS


b.o;
OS
0.2'i
0.)
0.5
O.S
05
05 i
Protection Agency methodology.









































-------
Tulilc  9     Concenlnlioni nf VoUiile OrG*nic Compound] in Groiimlwilcr Stmples CotlecleJ from J«2    ]6M»r92   l6-M«r-9?   l«-Mir-92    l6-M»r-»l    lfi-KUr-92    24-Mtr-92   24-M.r-92   J4 M.r-97   ]4-Mir-«l   24 >.
riilfijmncltionc
llriiiMimLcthnne
Vinyl chl'iriilc
Cltluroeltmne
Mdtiyleric clilnriUe
Acetone
Carhnn iliiulfule
I.l-Okliliirnellicne
l.l-tlithliit'iclliiiic-
1.2 hichtulDcllicric (cis/ltinl)
f hlur^furirt •
1,2 Ilitlilnii'cllione
2-l)utufluf*c
I.I, 1'TfichlflrOeihfcne
C*fhon ictrncMufiJe
nfOrnodicliloromclh*nc
1 42 • OicMoi ttprftpaitc
ittiiif- 1 ,3-l>icliloroprupenc
TrJcMtfMiciliciie
Dilirumoclilurofneiliine
1 . 1 ,2-Ti iclilorocltune
Jtifi/ene
cii-I.J-Dichloropropene
Jfroniofonn
4-Mccnicnc
IHylliciMcnc
Siyrciic
X'ylciici, (tiitnl)
0,45 J
0.5 IJ
O.S U
O.SU
0.79 U
2U
0.5 U
0.83
2
0.72
• 0.2 ;
0.5 U
2 U
0.5 U
0,5 U
O.S U
O.S IJ
0.5 U
21
O.SU
O.SU
O.S U
0.5 U
O.SU
2 U
2 IJ
O.S II
0.25 J
0 S IJ
o.s u
o.s u
o.s u
0.5 U
O.SU O.SU O.SU
0.5 U 0.5 U O.SU
O.SU. 0.5 U 0.5 U
0.5 U 0.5 U 0.5 U
0.64 U O.SU I.2U
2 U 2 UJ 2 U
0.5 U O.S UJ O.S U
0,45 J 0.25 J 0.44J
3.3 1.2 3.6
0.92 0.28 3 0.93
O.I6J 0,11,1 0. 17J
0.5 U O.S U 0.5 U
2 U 2 U 2 U
0.5 U 0.5 U O.S U
0.5 U . 0.5 U 0.5 U
0,5 U 0.5 U 0.5 U
O.SU O.SU 0.5U
O.S U O.S U O.S U
u a.i 9.3
O.S U 0,5 U 0.5 U
O.S U 0.5 U 0.5 U
0.5 U O.S U 0.5 (I
O.S U 0.5 U 0.5 U
o.su o.s u; o.su
1 U 2 tJ 2 U
1 \\ 4.2 2 U
0.5(1 O.S It O.SU
O.I9J O.U O.I5J
O.S U O.J U O.S U
0.5 U O.S U O.S U
o.s u o.s u o.s u
o.su o.s-u o.su
0.5 U 0.5 U 0.5 U
Analylecnnccnlrtliom in micrognmi per filer '(jirif per billion fppM).
Analyses were j>er/V>rmcil liy various analytical inhcanlraclon tiling standard U.S.
t) CumpnumJ concent ration wu determined
J HiliinateJ remit.
1 1 The cmnpoiinil wu analyzed for, but nnl
it All lejmmnc limili nmul
i All mmitiriK limil] micil
It Hcivill rejected.
Pit Red! repliMic »( prtviou;
ilnc In matrix 11
it t secondary dilution (nc|nr.
O.SU
0.5 U
O.S U
0.5 U
1 U
2 U
0.5 U
0.22J
0.83
0.15 J
0.09;
O.SU
2U
O.S U
0.5 U
O.SU
O.SU
o.su
a. 2
o.su
o.s u
o.su
o.s u
o.su
2 U
5.5
o.s u
0.09 J
O.SU
o.s u
o.s u
0.5 U
o.su
environmental

o.s (i
o.s u
o.su
o.su
1 U
2U
O.SU
0.2 J
0.71
O.I5J
0.09 J
O.SU
2 U
0.5 U
O.SU
O.SU
O.S U
O.SU
7.5 J
0.5 U
0.5 U
O.SU
O.S U
O.S U
2 U
7.3 J
O.SU
0.09 J
O.S U
O.SU
O.SU
0.5 U
0.5 U
Protection

O.S U
O.SU
O.S U
O.S U
O.S U
2 U
0.5 U
0.26 J
0.88
Q.I6/
O.SU
O.S U
2 U
O.S U
0.5 U
0.5 U
O.SU
O.S U
9.7 J
O.SU
O.SU
0.5 U
O.S U
0.5 U
2U
1.6 J
0.5 U
0.11 }
0.5 U
O.S U .
O.S U
o.s u
0.5 U
0,5 U
O.S U
O.S U
O.SU
O.SU
2U
O.SUJ
O.SU
0.67
O.I9J
0.09 J
O.SU
2 u
O.S U
O.SU
O.SU
O.SU
O.SU
10
. 0.5 U
O.SU
0.5 U
O.SU
O.S UJ
2 U
1 U
O.SU
0. IS J
o.s u
0.5 U
O.S U
o.s u
o.s u
R
tl
R
R
O.SUJ
O.S UJ
5.7 J
2.7 J
II J
0.32/
R
R
R
R
0.05 J
2,7 J
R
190 DJ
R
R
o.s u;
R
H
K
0.64 J
It
6.-I J
O.SUJ
R
R
R
0,5 UJ
O.S U
O.S t)
0.5 U
0.5 U
O.SU
2U
I.2U
2
1.9
4.7
0.3 J
0.5 U
2 U
0.5 U
O.SU
0.07 J
0.5 U
0.5 U
33 DJ
0.5 U
O.SU
0,5 U
O.S U
O.SU
2 U
2 U
O.j II
6,6
O.S U
O.S U
O.SU
O.S U
O.S U
R
U
R
R
O.SUJ
R
2.9 J
0.97 J
I.6J
4.S 1
O.SUJ
R
R
K
R
R
0.63J
R
31 J
R
R
R
R
R
H
R
k
3.4 J
R
I2J
R
R
R
R
R
. R
0.5 UJ
R
0.5 UJ
4.5 J
I6J
I7J
0.41 J
R
R
R
R
R
I.SJ
R
93 DJ
R
R
R
R
R
R
R
R
IBJ
R
R
R
R
R
0.1
0,5
0.5
O.S
O.S
•> i
0.5
2.4
6 .
U
0.)
0.5
2 1
O.i
0.3
O.S
0.9.
O.S
'571
O.S
O.S
O.J i
0,5 i
O.i i
2 II
2 II
O.i 1
IJ
O.S 1
0.5 t
021
0.5 <
0.86
Agency methodology.







delected tl the corresponding reporting limits.
itertcrcncei.









line In liigli tcvcli of oilier analytei. .

I tamplc.





















-------
Tilile  9     Conccnlnlioni of Volatile Organic Compounds in Grnnmlwtler Snmplet Collected from January lo Mirch 1992, OU II Remedial Investigation. Vega Aln, Puerto Rico.
                       Stmnle ID: OVAW 1105 BVAW 1106 DVAW 1107 DVAW 1108 OVAWII09 BVAW 1101  BVAW 1202 BVAW 1203  BVAW I2M  BVAW 1105 BVAW llOfi BVAW 1207 BVAV
                                (Ml Dm   (Mil)      (Mil)       (MM)      (XIII)      (MI2)       (MID      (Mil)       (Mil)       (Mil)             (Mil)       0-113)
 Arutyte
                       Due:
24-MT-92
                                                      24-Mir-92   2-l-M»r-92   24-Mir-92
                                                                                                   l9-M«f-92    19 M.r-92    |9-Mir-91   l?-Mir-92   )9-Mir-92    l9-M«r-91
Clilnromeilicne o!5 U R 0.5 U 0.5 U
liionmmelliine O.S U II O.S IJ O.S U
Vinyl chloride O.S (J R 0.5 IJ 2.7
CMurocilmne O.I U .'1 0.5 U 0.5 U
Mclliylenc chloride O.SU O.S UJ O.SU 0.5 U
Attiunc 211 It 2 U 2 II
lafhoii Ji>ul/idc O.SU 0.5 UJ O.SU O.SU
I.J-OicliliiftMUhenc 3.5 J 2.5J 2.4 1-3
1 ,1 DKlitnrotilmnc f'.t IJ 3.5 2
1.2 -l>ichli»iwlliciie(cix/i»iiii) |3 MJ 5.6 3.8
Chk>ri.r»rrii 0.38 J 0.3 ) 0.32 J O.SU
1.2 -Oklilnrocilifeiie . O.5 IJ It O.SU 0.5 U
.' ltiiii.ii»nc 2 IJ It 2 IJ 2U
1,1,1- l*i Idilorncihinc O.SU ll 0.5 U O.SU
Co i l.i j ii leiruliiuridc 0.5 U R 0.5 U 0.5 U
llfiinuHlichluroincllune 0.5 U R O.I U O.S U
l.2-l>ichlr>runrun>fie 0.88 0.78 J O.SS I.I
uuiifl 3-D'Lhlnrnnronenc O.S U R O.IU O.SU
Trii-til'iriiL-ihcne 43 1)1 78 DJ 33 2£
DrlirunmvMuruinelhanc 0.5 U R 0.5 U 0.5 U
11.2-Trichloriiethane O.SU R O.SU O.IU
lluiueiie 0.5 U It 0.5 U 0.28 }
Ln-I.MJichlnropropcne O.IU It 0.5 U O.SU
Hn.moiwm OS U II ' O.S U O.S U
4-Mtlliyl-2 peiilannnc . 2 U It 2 U 2 U
MicMni.nc 2U R 2 U 2U
1.1.2.2-TctrielilorcKthanc O.SU K O.SU O.SU
Uii.tldiJri.ciliciic 17 13 J 6.6 1.2
lohicnc O.SU 0.5 UJ O.SU O.SU
lVM<.f«licn»nc 0.5 U . R 0.5 U O.I IJ
f'lhyllicii/ciic O.OSJ. R 0.05 J 0.1 J
Siyrejie O.S IJ It ", S U O.S U
Xylcnct (luul) 0.5 UJ K < -> U O.SU
O.SU
O.S U
0,5 U
0.5 U
0.5 U
2 IJ
O.SU
1.3
1.3
2.2
0.2SJ
O.I U
2 U
O.IU
0.5 U
O.S U
0.37 J
O.S U
13
0.5 U
O.SU
O.SU
O.S U
O.S U
21)
2U
O.S U
1.7
O.I IJ
O.S U
O.S U
O.SU
0.5 U
Analyic concenlnliont in micro grarm per liier tpftt* per "billion Jpnl>](. ' •
Antlytei were performed by vinuua analytical subcontractor* using ilinJtrJ U.S. Environmental
1) rmnpoiind concentration was itetermint") ll a tecondary Jilulinn factor.
J Hkirinftlcd result.
II Tlic compound was analyzed for, hut no; detected at Hie correspond ing reporting
it AM re|Hiilini: IJniili rtiicd idle In innlrin interference).
IAIJ iriHiiiinj: tiinili niicil line In lii|;li icvcli of oilier atmlylcj.
I Itcntll (cjoclcil.
l:l( l:icl<) repliccle of prew'mu iimplc.

limit*.


0.5 U
0.5 U
O.S U
O.S U
O.S U
2U
O.S U
O.IU
O.SU
o.i u
0.5 U
O.S U
2U
0.5 U
O.S U
O.S U
O.S U
0.5 U
0.21 J
0.5 U
0.5 U
0.5 U
0.5 U
O.SU
2 U
IJ
O.S U
O.S U
O.I tJ
0.5 U
1
1.7
0.07 J
O.SU
O.S U
0.5 U
O.S U
O.S U
2 U
O.SU
O.SU
0.5 U
O.S U
O.SU
O.S U
2 U
0,5 U
0.5 U
O.SU
O.SU
0.5 U
0.39 J
O.SU
O.SU
0.05 1
O.SU
O.SU
2U
I.SJ
0.5 IJ
0.5 U
O.SU
. O.S U .
1.4
2.5
O.I J
O.S U
0.5 U
0.5 U
O.S U
0.5 U
2 U
1.4U
0.5 U
O.S U
0.4 J
O.SU
0.5 U
2 U
0.5 U
O.SU
O.S U
O.IU
O.IU
3.1
O.I U
O.SU
O.I2J
O.I U
0.5 U
2 U
4.4
0.1 U
O.I6J
O.I U
0.5 U
2.3
2.4
0.33 J
O.S U
O.SU
O.S U
0.5 U
0.5 U
2 U
0.5 U
7.9
2.6
12
0.28 J
O.SU
2U
0.5 U
0.5 U
0.5 U
I.I
O.S U
190 D
O.SU
O.SU
0.06 J
0.5 U
O.SU
2U
2U
O.SU
9.4
O.SU
O.SU
0.5 U
O.S U
0.5 U
O.S U
0.5 U
O.S U
O.S U
O.S U
2U
0.5 U
3.4
1.3
5.2
0.21 J
O.S U
2U
O.SU
0.5 U
0.5 U
2.3
O.SU
HOD
0.5 U
0.5 U
0.5 U
O.SU
O.SU
2 U
0.44 J
O.S U
4.6
0.5 U
0.5 U
0.5 II
O.SU
0.5 U
O.SU
O.S U
0.5 U
O.SU
O.S U
2 U
O.SU
2.2
I.I
4.1
O.I9J
O.S U
0.77 J
0.5 U
O.SU
O.SU
2.1
0.5 U
9] O
O.SU
O.SU
O.S IJ
O.SU
0.5 U
2U
2.8
O.S U
3.1
O.S U
O.SU
O.I U
0.5 U
O.IU
O.SU
O.SU
O.SU
0.5 U
0.5 U
2U
0.5 U
I.S
0.82
3.3
O.I8J
0.5 U
2 U
0.5 U
O.SU
O.IU
2
OS U
39 D
O.SU
O.SU
0.5 U
O.SU
0.5 U
2U
I.I J
0.5 U
2.3
0.5 U
O.S U
0.5 U
O.SU
O.IU
O.I
O.S
0.1
0.5
0.5
2 tl
0.1 1
0.62
O.S
2 J
O.t J
O.lll
2 II
0.1 IJ
0.1 (1
0.5 1)
I.6J
0.5(1
32
0.5 tl
0.5IJ
0.5 11
O.I II
0.5 tl
2 U
I.I J
0.5 (1
1.2
O.I (1
O.SU
0.511
O.SU
0.5 tJ
Protection Agency methodology.

































-------
       9    Cunceniminnt of Volatile Organic Compounds in GroiinJvvaler Simple* Collected from January lo March 1992, OU 11 Remedial Invcjtigation, Vega Alu, Puerto Rico.



                      Simple ID: nVAW 1708 BVAW 130) DVAW 1301  DVAW 1302  DVAW 1303  DVAW 1304  DVAW 1305  BVAW 1306  DVAW 1307 DVAW 1301  BVAW 1309 DVAW 1310 OVA
                                (Ml2) Fit   (MI3)       (Mn)PK    IMI3)       t»riiineihonc 0.5 U 2.2 ,1.1 U 0.5 UJ
IliiHiioinciliniic 0.5 It 0.5 U 0.5 U 0.5 U
Vinyl Ll.hx«lc 0.5 U 0.5 If 0.5 If 0.5 tl
ttilofocilitnc 0.5 II 0.5 U 0.5 U 0.5 U
McOiylc.ic cdliiriilc O.SU O.SU O.SU O.SU
AVCI.HIC 2 U 2 U 2 U 2 U
Cnhon iliiulfide 2.1 J I.6U 0.92 UJ 0.78 UJ
I.I Difhliirmtlhenc 0.89 O.SU O.SU O.SU
1 1 (JiLli|,.f.,clliinie fl.C/i 0.5 It 0.5 II • 0.5 II
I.MJrilil.inicii.ciic (tii/ii.m) 2.7J 0.5 tJ O.SU O.SU
riiiiinifiimi o.i'fij o.5 if o.su o.s u
1.2 |jklil..fiieiliHiic 0.5(1 0.5 U 0.51) O.SU
2-HuHir.«ne 2 U 2 U 2 U 3 11
1.1,1-Tridilor.iellmne O.SU O.SU O.SU O.SU
r.ihnn n.-i(.ciiJuridc 0.5 U 0.5 U 0.5 U 0.5 U
tlr<>m<.tii..litiiicih*nc 0.5 U 0.5 U 0.5 U 0.5 U .
I.Mtohlurnprnpmte 2J O.SU O.SU O.SU
rram-1.3 IJiLhlocoprupenc O.SU O.SU O.SU O.SU
rncMmiiciliciiE 30 D 0.5 U 0.5 U 0.77
r>4liromi>clili>ruineihiine 0.5 U 0.5 U 0.5 U 0.5 U
1.1.2-TlieMnnielliiinc 0.511 0.5 tf O.SU O.SU
htii/cne 0.5 It 0,5 It O.SU O.SU
cii-I.J.nictilornnnmenc 0.511 O.SU O.SU 0.5 (J
Hf-m.nl.mn 0.5 U 0.5 U O.S LI 0.5 U
•l-MLiliylO-piiiilhiiiuti: 211 2 UJ 211 2 U
2 lltA.itmic 211 2U 2U 211
l.l.2,2-l<:irpL|l|1,(4.ciho..e (1-5 (1 O.SU 0.511 O.SU
lc)t.Lhl..i,,cil,cnc If- 0.5 U O.SU 0.24 J
h.lucne 0.5 It O.I 1.1 O.MJ O.SU
rM..r..l»:n«iic 0.5 If 0.5 U 0.5 U 0.5 U
hiliyll.ciitenc 0.511 1.2 1.4 O.S U -
Siyreiw O.SU 1.9 2.4 0.5 U
X'y kites (Uiul) 0.5 tl 0.07 J 0.07 J . O.SU
O.SU
O.S U
0.5 U
0.5 It
O.S U
2tl
O.SUJ
0.5 tl
0.5 II
O.SU
0.5 U
0.5 U
2 U
O.SU
O.SU
O.S U
0.5 U
O.S U
0.82
O.SU
0.5 U
0.5 It
O.S U
0.5 U
2U
2 U
O.SU
0.32 J
O.SU
0.5 U
0.5 t)
0.5 U
0.5 U
Arulyie conccnimiont in micrograms per liler (parti per billion fppbj).
Analyicj were performed tiy various analytical inliconl radars nimg lUndard U.S. nrivironmenlat
I) Compound cnnecnlmlinri wat dclermincd si « iccondary dilution factor.
J l-iiiinateif remit.
II Tin: i-iiinixiiiiiil w.i inily/cit Inr, (ml no) delected nl Hie corresponding reporting
• 1 All ic{H>niii|; liiriiH rviiul due lit nlnlriji iiilcricrencci.
1 All icMiiiim; limili r«iicil ilnc In liii'li level* of oilier analylei.
l( Kcviill feictlcil. " ' • .
IU l:iclil rcfilieilc of )>ri;vii>ni umptc.

limili.



O.SU
0.5 U
0.5 U
0,5 U
0.5 U
0.5 U
0.5 U
0.5 U
0.5 U
0.5 U
2U Hi
0.75 UJ 0.58 UJ
0.5 U
0.5 U
O.SU
0.5 U
O.SU
2 U
O.SU
O.SU
O.SU
O.S U
O.SU
0.75
O.SU
0.5 U
0.5 U
O.Stl
O.SU
2U
1 U
0.5 U
0.43 J
O.SU
0.5 U
0.5 U
0.5 U
0.5 U
Pralcelion





O.SU
O.IJ
0.68
0.5 U
0.5 U
2 U
0.5 U
0.5 U
0.5 U
0.2 J
O.SU
3.8
O.SU
0.5 U
0.5 U
0.5 U
0.5 U
2 U
2U
O.S U
3.8
0.5 U
O.SU
0.5 U.
O.SU
O.SU
O.S U
0.5 U
O.SU
0.5 U
0.5 U
2 U
I.2UJ
O.SU
0.5 U
0.59
O.SU
0.5 U
2U
0.5 U
O.SU
0.5 U
0.22 J
0.5 U
3.6
O.SU
0.5 U
0.5 U
0.5 U
0.5 U
2 If
IU
0,5 U
3.7
0.5 U
0.5 U
0.5 U
0.5 U
O.SU
0.5 UJ
0.5 U
0.5 U
0.5 U
0.5 U
2U
0.5 UJ
O.SU
0.06 J
0.54
O.SU
0.5 U
2U
0.5 U
0.5 U
0.5 U
0.24 J
0,5 U
3.2
0.5 U
0.5 U
0.5 U
O.SU
0.5 U
2 U
2U
0.5 U
2.S
0.511
0.5 U
O.S U
O.SU
O.SU
Agency methodology.















0.5 U
0.5 t)
0.5 U
0.5 U
0.5 U
2U
I.4UJ
0.08 J
O.I5J
I.I
0.5 U
0.5 U
2 U
0.5 U
O.SU
O.SU
0.2 J
O.SU
5.6
O.SU
0.5 U
0.5 U
0.5 U
0.5 U
2U
I U
0.5 U
4.8
0.5 U
0,5 U
O.SU
0.511
0.5 U






0.5 U
0.5 U
0.5 U
0.5 U
O.SU
2 U
0.67 UJ
0.5 U
0.12J
0.95
O.S U
0.5 U
2U
O.SU
O.SU
0.5 U
0.16 J
0.5 U
4.6
0.5 U
0.5 U
0.5 U
0.5 U
0.5 U
2U
2U
O.SU
4.1
0.08 J
0.5 U
0.5 U
0.5 U
O.SU






0.5 U
0.5 U
0.5 U
0,5 U
O.SU
2U
O.SUJ
O.SU
0,11 J
1
0.5 U
'05U
2 U
0,5 U
0.5 U
0.5 U
O.I9J
O.SU
4.8
0.5 U
0.5 U
0.5 II
0.5 U
0.5 U
2 U
2 U
0.5 U
3.6
O.SU
0.5 U
0.5 U
0.5 U
O.SU






O.S
O.S
0.5'
0.5
0.5
21
0.5
0.5
0.5
O.S
0.5
05
2 tf
O.S
0.5
0.5
0.5
0,5 1
0 5 1
0.5 I
0 5 U
0 5 II
0.5 II
0.5 It
2 II
2 tl
O.S tl
0.5 II
0.5 II
0.511
0 40 1
0 78
O.SU







-------An error occurred while trying to OCR this image.

-------
Tililc   9     CnncenIrationi n( Volatile Organic Compound! in Groundwalcr Simple) Collected from January lo March 1992. OU II Remedial Investigation. Vega Alu, Puerto Rico.
                        Sample ID- BVAW 1504 BVAW 1505 BVAW 1506 OVAW ISO?  DVAW IJOI BVAW 1509  BVAW ISIO BVAW 1510 BVAW 1511 BVAW t«l  BVAW IW2 BVAW I6O1 BVA\S
                                  (MI5)       (MI5)      (MIS)       (MIS)       (Kill)      (MIJ)        (MIS)       {MlJ)FR   (MIS)              (Ml*)      (Mt6)       (MI6)
 Arul>l«
                        Due:
                                  Il-Ftl>92   U'Fcb-91   li-F-92    ll-P«b-92    ll-Fcb-92   )2-Fcb-92     !2-Fcb-92    ll-Ftb-92    10-Feb-92   26-Fcb-92    26-Fcb-91   7i-Fcb-92   24-Ftl.,
rhl..f.inii:lh«ne 0,51) d.S U O.SU 0.5 J
Itru.r 	 ell 	 e O.S II O.SU O.S II 0.5
ViuyUM.iii.lc O.S II OSU O.SU O.SU
CMnmciUnc 0.5 UJ OSU O.SU 0.5 UJ
Mclhyleiicclilr.fidc O.SU O.SU O.SU O.SU
Acctmic 2 II 55 2 If 1.2 J
C.rt,n iiiirachlunile O.S U O.S U O.S U O.S U
llri.mndiclilnrnincilnne O.j U O.S U O.S U 0.5 U
].2-l>icMor»j>r<>panc O.SU O.SU O.SU O.SU
	 (•t<3-()klil.iropr Trkhl.irnttlianc O.j II O.S IJ O.S II O.S U .
iinn/cnc O.S 11 O.j IJ 0.5 U O.S U
civ-U-nkliturunrippcne O.SU O.SU O.SU O.SU
ftnuriWiirm 0.5 U 0.5 U O.S U O.S U
•4 Mciliyl-2.pc«iiiiiiiiic . 211 2U 2 IJ 2 U
•>-Mii»n»iic 2 U 2 II . '/ 2 II
1 1 2 2-Teiruehlornclliinc 0.511 O.JU 0.5 IJ O.SU
ItKnclil.ifKtitituc 0.5 IJ O.JU O.j tl 0.511
•|,t|ue,ic 0.5 fl 0.511 O.SU 0.51)
f:|1l.,r.,liei,(ene O.S U O.S U 0.5 U 0.5 U
1 il.vll.cii/ciic I.6-. 2.2 .0.39J O.A7
liviciic 2 3 3.3 0.64 1
Xrk,,es (tni.1) 0.5 U O.S U O.S U 0.5 U
0.5 U
n.5 U
O.SU
O.S U
0.5 U
2 II
0.9-1 U
O.SU
O.S II
O.S U
0,5 U
O.SU
2 U
O.SU
O.SU
O.SU
O.SU
o.su .
O.JU
o.su
0.5 U
0.5 U
O.S II
O.S U
2 U
2 U
0.5 U
n.s u
0.5 U
o.su
0.48 J
0.76
0.5 U
Analyic cnncenlratiuns in mtcronramj per liter (peftJ per billion fppl>)). ..,__''.
Analyse* were perfamied l»y various analytical subcontractors using ilandtml U.S. Environmental
() C
-------
  Tittle   9    ConccnlrolinM of Volatile Organic Compound) in Groundivaler Samples Collected from Jimitry to Mtrch 1992, OU II Remedial Invcjliealion. Vcg« All*. Puerto Rico.
                          S»mple ID: DVAW 1604 DVAW l«05 BVAW 1606 DVAW 160.7 DVAW 160S BVAW 1*09  DVAW 1701  DVAW 1702 BVAW 1703 BVAW 17« BVAW 170S BVAW 1706 BVAV
                                    (MI6)      (MI6)       (Ml 6)       (Mt6)       (MI6)       (MI6)        (M17)       (MIT)      (M17)       (MIT)       (MIT)       (MIT)       (XII7)
   Aiuljrtc
                                    27-F*h.92   27
                                                          J7-F«b-92   27-rtb.<>2   27-F«h-92    27-Fcb-92     IS-Ftb-92
                                                                                                                                  2J-Fcb-92   IS-Ftb-92
                                                                                                                                                                      U-F«b-91
Oilnromciliine
flroni'ptiicilinric
Vinyl tMori'lc
Clilnfocihonc
Mclltyfene chloride

AtCll*MC
Carbon Jisulfidc
I.l-Dichlorucilicnc
I.I hii.lilipnitilp.ue
1 ..' Diclilcnucilicric (cii/lr*n*)
f*li|i)f iifni in

2 • liuiM none
1 > 1 ,1-TrichlAEoclhane
Curium itiriehlnride
llroinoilicliloruincrliine
1 .2-Diclilpinc
fruits 1 .3 OkJ.loinfi/iifttne
'1 riiltfirrfM.'dicric
f>i(>ruiiiiichli>ruruclli*itc
1 . 1 ,2-Triclilurnciliine
llCJI/CJIC
ci»-l,J'Dicltlor'>propenc
liriini'tftif in
•1 Mtiliyl-2-penlnti'iiic
2- Ifcxinrjnc
.1.1 .2.3* TctfftCljJuroclliiiiH:
1 clffectiffjrucllitijie
1 t»luc'tc
(Vliiur i'ticn /cue*
lilliyll>cli/cJie
Siyrcitc
X'ylencs (mill)
0.5 U
0.5 U
0.5 U
O.SU
O.S U
!* 8 II
0:5 U
O.S U
n.iii
OXWJ
0.14 1
0 5 tl
I U
o.s u
O.SU
o.s u
o.s u
O.S 11
CMC, 1
0.5 II
0.5 U
0.5 U
0.5 U
0.5 UJ
2U
i Y.J
o.s u
0,28 1
O.S U
O.JU
O.JU
O.JU
O.J U
0.5 11
0.5 11
0.5 U
O.SU
2 tl
O.S U
o.ju
0 08 J
0.07 J
0.13 J
O.S 11
2 U
O.S U
O.JU
O.SU
0.5 U
o.s u
0.3S J
o.s u
o.s u
o.s u
0.5 U
0,5 Ul
2 U
2 U
O.S U
O.I9J
0.5 U
0.5 U
0.5 U
O.JU
O.JU
O.JU
O.J U
O.JU
O.SU
2 II
O.JUJ
0.5 U
O.I J
0.0!* J
0.14 1
0.5 U
2 U
O.SU
O.J U
O.JU
O.S U
0.5 U
0.44 J
0.5 U
O.S U
0.5 tl
O.J U
0.5 U
2 U
2 U
O.S U
0.191
O.SU
O.J U
O.J 11
O.JU
O.J.U
0.5(1
O.S II
O.S II
0.5 U
o.s u
2 II
0.5 UJ
O.J U
O.IJJ
O.I3J
0.17 J
0.5 11
2 U
0.5 U
O.JU
0.5 U
0.5 U
O.SU
0.491
0.5 U
O.S U
0.5 U
0.5 U
O.S U
2 U
2 U
O.S U
0.32 1
0.5 U
O.J U
n.su
0.5 U
O.J U
0.511
O.S tl
0.5 u
o.s u
O.JU
2 tl
O.S 111
0.5 U
0.15 1
0.121
O.I9J
0.5 U
2 U
O.SU
O.SU
O.J U
O.S U
O.JU
0.62
O.SU
0.5 U
0.5 U
0.5 U
0.5 U
211
2 U
0.5 U
0.361
O.SU
O.JU
O.J U
O.JU
O.JU
O.JU
O.S U
0.5 U
0.5 U
o.s u
2 U
O.JUJ
O.J U
0.06 J
0.5 U
0 12 J
0.5 U
IU
O.S 11
O.S U
O.S U
0.5 U
0.5 U
0.371
0.5 U
0.5 U
0.5 U
0,5 U
O.J U
2U
1 J
0.5 U
o.ts j
0,5 U
O.SU
0.5 U
O.J U
O.JU
O.JUJ
0.5 U
0.5 U
O.S U
0.5 U
2 II
O.S UJ
2.1
0.5 U
1
0081
O.SU
2 I!
O.SU
O.SU
O.J U
0.61
O.JU
21
O.SU
0.5 U
O.S U
O.JU
OSU
2 U
2U
. 0.5 U
O.It J
O.JU
O.JU
O.J U
O.J U
O.JU
0.5 Ul
0.5 U
0.5 U
0.5 U
O.SU
7. U
0.5 UJ
1.2
0.5 U
0.73
0.06 J
O.J U
2U
O.SU
O.JU
O.JU
0.45 J
O.SU
IS
O.JU
O.JU
O.J U
O.J U
O.J U
20
2 U
O.S U
O.O9J
O.J U
O.JU
' O.JU
O.SU
OJU
O.J U
O.J II
0.5 U
0.5 U
O.JU
2 II
O.S UJ
0,5 U
0.76
0.06 J
O.S U
2U
0.5 U
O.JU
O.SU
0.47 J
O.JU
IS
O.J U
0:5 U
O.J U
0.5 U
O.S U
2 UJ
2 U
O.SU
0.14 J
O.SU
0.5 U
0.5 U
O.SU
O.SU
0.5 U
0.5 U
0.5 U
0,5 U
0.5 U
2U
0.5 UJ
1.7
O.S U
0.66
0.08 J
0,5 U
2U
O.JU
O.JU
O.JU
0.47 J
O.JU
10
O.JU
O.SU
0.5 U
O.JU
O.SU
2UJ
2 U
O.J U
O.I2J
0.5 U
0.5 U
O.SU
O.S U
O.S U
O.S U
O.S 1)
0.5 U
O.J U
O.J U
2U
0.5 UJ
O.I J
0.5 U
O.I6J
O.S U
0.5 U
2U
O.J U
O.J U
O.S U
O.S U
O.J U
3
O.SU
0.5 U
O.J U
0.5 U
O.SU
3UJ
2 U
0.5 U
O.JU
O.JU
O.JU
O.J tl .
O.S U
O.JU
O.JU
O.J U
O.J U
O.J U
O.J U
2U
O.SUJ
0.3 1 J
O.JU
0.2 J
O.S U
O.S U
2U
O.SU
O.JU
O.SU
O.J U
O.JU
4.6
O.JU
O.JU
O.JU
O.SU
O.SU
2UJ
2 U
0.5 U
0.5 U
O.SU
O.JU
0.5 U
O.J U
O.JU
0.5 1
n.JI
0,5 1
0.5 1
051
2 U
O.IS <
0.13
0.5 1
O.t?
0.51
O.J I
2U
0.511
0.5(1
0.511
0.5 II
0.5 II
3.61
O.SU
O.S II
0.5 II
0.5 II
0.5 II
2111
211
O.S II
D.5 II
0.5 U
O.JU
0.5 II
O.J tl
O.J U
Arnlyte ciincenlriilinnt in micrognifin per lilcr (pint perlx'llinn |ppti|).
Atulyici were performed hy vinoui tnilyliol subcontractor* using ilindaru U
                                                                          .S. Environmenul Protection Agency mdhoifolofy.
[J      CuiiipKimtl concentnlion wtt dclcrmincd *l i icconJiry dilution Ticlor.
I      rilimttett rc»nll.                       ...            ..         ....
II      Ttic cimipmind wm «n*lyz.«l fur. hul not delected it I lie cnrrespondmj; reporting hniili.
il      All leixiiliiif: limits fijied due tn nutria interfcrvncei.
j      All (cixiilii.i; limit! rtiled due to llt^ti kvcli of (lllicf innlylci.
       Html/ rejected1.
       Ticlil rt|ilit«le of prcvuiiu itinple.
It
IK

-------
Tiilile   9    Concenlnilioni of Volatile Orginie Cnmpotmd* in Groiinrfwuler Samples'Collected from tinutry to Mtrch 1992. OU II Rcmcdul Invctligtlion, Vefi* All*. Puerto Rico.
                                                                                                                                                                             Pige
                        Simnle ID: DVAW 1707 nVAW 1708 BVAW IIOI  DVAW 1101  DVAW 1103 nVAW IICM  DVAW 1105 BVAW 1106  DVAW 1807 8VAW IS07 6VAW ISOI  BVAW 1901
                                  (MI7JFK    (MI7)       (MID       (MIB)       (MIS)      (MIB)        (MI8)       (Kill)       fMIt)       (MII)FR    (Kill)       (Ml?)       (MI9)
 Aiulyle
                        Dilt:
                                 15-Fcb-M   I«-Feb-92    4-F(b-92
                                                                               4-Feb-92     4-Fcb-92
                                                                                                       S-F«b-91
                                                                                                                   S-Fcb-91    5-Ftt>-92
                                                                                                                                          S-Feb-9J
                                                                                                                                                      S-ftb-91   13-Mir91   TJ.M.r
riiluromclhane
llrmnOIIIClltmiC
Vinyl tlijurpje
Clilnruclliine
Mclliyleiie cliluride
Acciiinc
Cathon JilulTuJe
i !' ! r • I ' ii
1 .2'Uii'lil'iincihcric (civ/lCDpli)

1 ^.'i>'i''ip'l''ri.etl line
V ft , * *
1 , J , 1 -IV icJilOFOclhwic
Cuiliau rdrtcliluriile
Hri>inndiclili>rumeilitnc
1 ,2-Diclili>ruprup«nc
iimj. 1.3 Ditliloroiirnpcnc
fJihfornnchlorinTicilitiie
1 , 1 ,3'Tf ictd»r"'**!*litne
flCJI/cnC
tis- J .3'f)ii'Jilorupr4ipcne

4 Mtlliyl 2 jielilmnplic
"^ • 1 1 CJIttfMJItc
1 . 1 .242rTcir*ctiloj'iic(fiHnc

'I i
(VMipfdticn/ene
lilliylliciiicnc
iiyrciic
X'yleiio (luiil)
0.5 U 0.5 U
0.5 U O.S U
0.5 U 0.5 U
0.5 U 0.5 U
0.5 U O.S U
2U 2U
0.5 UJ O.S UJ
0 07 J 0 5 U
o's If 0 5 tl
0.11 J" O.SU
0 5 U 0 5 U
05 U O.S U
2 U 2 U
0.5 U 0.5 U
0.5 U O.S U
0 5 U 0.5 U
0.5 U 0.5 U
O.SU O.S U
2.2J 0.06
O.S U 0 ', U
0.5 If 0.5 If
0.5 tl 0.5 U
0,5 U 0.5 U
0.5 U 0.5 U
2 UJ 1 UJ
2 IJ 2 U
0.5 U O.S U
O.S U O.S U
0 5 U 0 5 U
o's u o.s u
o.s rr n.s u
O.S U O.S U
•1.5 U 0.5 U
O.SU O.SU O.SU
0.5 U O.S U 0.5 U
O.S U 0.5 U 1.6
O.S UJ 0.5 UJ 0.5 UJ
0.5 U 0.5 U 0.5 U
2U 2U
O.S U 0.5 U
0 5 If O.S U
O.SU O.SU
O.S U O.S U
0 5 U 0 S If
0.5 U 0.5 U
2 U 2 U
0.5 U O.S U
O.S U O.S U
0.5 U 0.5 U
O.S U 0.5 U
OS U O.S U
O.S U 0.5 U
O.SU O.SU
0.5 U 0.5 IJ
0.5 U O.S II
O.S U O.S U
0,5 UJ 0.5 UJ
'2 If 211
2 U 3
0.5 U 0.5 If
0.5 IJ O.S U
O.S II O.S U
O.S U ' O.S U
0.13J O.|6|
0.5 IJ 0.5 U
O.S U O.S IJ
Anilyle cnncentmiioni in micrngwni per liier (parti per billion fppl>l).
Annlyict were performed by vinmii indyticil tubconlnelon uiing ilandinl U.S.
U Cntuftottnd cnncenl rul inn w*>
J psliriitled result.
2U
O.S U
O.SU
O.S U
0.5 U
0.5 IJ
0,5 U
2 U
O.SU
O.S U
0.5 U
O.SU
O.S U
O.SU
O.SU
0.5 tl
O.IB J
O.S It
0.5 UJ
2 It
2 U
O.S U
o.su

p.'s u
12
0.37/
O.S U
Environmenol
O.SU
O.S U
0.5 U
0.5 UJ
O.SU
2U
O.S5U
a.s u
0.5 U
O.S U
o.su
2 U
O.S U
O.SU .
o.su
0.5 U
o.s u
o.su
O.SU
o.su
0.5 U
0.5 U
0.5 UJ
2U
2 U
O.S U '
O.SU
O.S U
O.SU
0.34 )
0.42 J
O.SU
O.S U
O.SU
0.5 U
0.5 UJ
0.5 U
2 U
0.76 U
0.5 U
0.5 U
0.5 U
0.5 U
O.S U
2 U
O.SU
o.su
0.5 U
O.SU
O.S U
0,5 U
O.S U
O.S U
0.5 It
O.SU
0.5 U
2U
2 U
0.5 U
0.5 tJ
O.SU
0:SU .
0.49 1
0.5 U
O.SU
0.5 U
0.5 II
O.SU
O.SU
2 U
1.3 U
O.SU
0.5 U
O.SU
0.5 U
O.S U
2 U
O.S U
O.SU
O.SU
O.SU
0.5 U
O.SU
0.5 U
O.SU
O.S U
O.S U
o.su
2U
2U
O.S U
O.S U
O.SU
O.S U
0.46 1
0.5 U
O.SU
O.S U
o.s u
o.s u
o.su
o.su
&U
0.5 U
O.SU
0.5 U
O.SU
0.5 U
2U
O.SU
O.SU
0.5 U
O.S U
0.5 U
O.S U
0.5 U
OSU
0.5 U
O.S U
O.S U
2 U
3U
O.SU
O.S U
0.5 IJ
O.S U
0,66 J
0.42 J
O.SU
e.su
o.s u
o.su
o.su
o.su
2U
o.su
0.5 U
o.su
o.s u
0.5 U
o.su
2U
o.s u
0.5 U
0.5 U
O.S U
0.5 U
0.5 If
O.SU
O.SU
0.5 If
D.S U
O.S U
2 U
2U
0.5 U
O.SU
0.5 U
0.5 U
1.4}
1.21
O.S U
O.S U
O.S U
o.su
0.5 U
O.S U
2U
O.SU
0.5 U
O.SU
O.SU
0.5 If
o.su
2 U
0.5 U
O.S U
O.SU
0.5 U
0.5 U
0.5 U
0.5 U
O.SU
0.5 U
O.S U
O.SU
2 U
2U
O.S U
0.5 U
O.S U
o.su
0.2J
0.06 J
O.SU
O.SU
0.5 U
O.S U
OSU
O.S U
1U
l.SU
o.su
o.s u
o.su
o.s u
0.5 U
2U
O.SU
0.5 U
O.S U
0.5 U
0.5 U
O.S U
O.SU
0.5 U
0.5 U
O.SU
O.S U
2U
2U
0.511
O.SU
O.S U
O.HJ
1.2
1.2
O.SU
0.5 tl
0.5 II
0.511
O.S II
0.5 U
2 U
2.4 11
O.S II
0.511
0.5 II
0.5 IJ
0.5 It
2U
0.5 II
05 If
O.S IJ
0.5 U
0.5 II
0.5 II
0.5 IJ
0.5 II
0.5 IJ
O.S II
0.5 It
2U
2 U
0.5 U
0.5 II
0.5 II
0.5 U
1.4
0.5 U
Protection Aeency methodology.
determined it * iccondiry dilution hclnr.











tl Tito CDinpniinil vuii' analyzed for. l»il pnl deleclcd at (lie cnrrci|ioniling reporting limili.
>l All fc|Bii\in|: limili taiicil ilnc ID iiuuii uilcrfcrencct.
j All iciioiiiiii; limit) failed ilnc Hi l"t'> level) nf mlicr miatyiei.
l< Hcsiili rcicclcil.
1 t< l:itM rc(iHi;ntc pif ptcviipni simple.

-------
T.hlc   9     Concentration! of Vnlnlilc Orginic Compounds in GrotindwMcr Simple! Cnltccled from Jimiiry lo Mirch 1992, OU II Rcmcdi*! Invealigilion, Vega Alii. Puerto Rico.
                                                                                                                                                                              Plje I'
Simple ID: I1VAW I90J IW AW
          (Ml 9)      (Ml 9}
                                                        riVAW 1905  DVAW 1906 DV AW 1006  BV AW 1907  DVAW 1908  BVAW 1909 BVAW (910 BVAW 2001  BVAW 20OJ  BVAW 1064  BVAW 7
                                                        (MIS)       (MI'J)       (M!9)PH    (MIS)       (Ml 9)       (M|9)       (MI9>       (M10)       (M20)       (KI20>       (MIU)
 Arulylc
                        Dilc:
                                  21-M«r92   ll-Mir-91   ZJ-Mir-92    I3-Mir-92   2J-Mir91   25 Mir-92    2S-Mir-92    2I-M*f-92   15-Mir-91    3-Feb 92    3-Feb-SH    3-F«t>-91     3 Fib V:
rt,|<>t"iiiclh«icl.li>«pc(liiii« 0.511 O.SU O.I2J O.IU
1.2 IJkhluiuciliciic (cii/lr«n<) O.IU 0.5 U 0.42 J 0.27 J
rhWiifotiit 0.511 0,5 U 0.121 O.SU
l.i Divlitr.f.jcHmne O.SU O.SU O.SU 0.5 U
2 liiilaiione 111 2U 1.4 J 2U
l,l.l-Trit:liJ»ri>cll»nc O.SU fl.5 II O.SU O.SU
(VdilMin ictmclilnride O.S U O.S U O.S U 0.5 U
[ir»innJkl>li>iuinclhkne 0.5 11 0.5 U ' ' II 0.5 U
1.2 -Dklilnfnpfupine O.SU 0.5 U i.,i U 0.33 J
train- 1.3 Dichltiropropene O.SU 0.5 U O.SU 05 U
T.kliJmiittlieiie 0,511 O.SU 5.1 4)
rMirumuchlornnieihkne 0.5 U O.S U 0,5 U 0.5 U
1.1.2-Triclilnroeihnne 0.5 U O.SU 0.5 tl O.SU
llcn/eiia 0.07 J O.SU O.IU O.SU
ci» -I.J •Dicliliirnprtipcne 0.5 II 0.511 0.5 U 0.5 IJ
llriiiii..r»riii 0.5 U 0.5 U 0.5 U O.S II
4 -Mclliyl-2 -iMMikniine 2 U 2U 2 U 3U
2 -llexnniinc 3.2 2U 2 U 211
1,1,2,3 lcirBcMnn.cllii.nc . 0.511 O.SU O.SU 0.5 U
luKDClili.iiiclJicKc 0.511 0.5 [J 0.99 0.96
fc.luefic 0.5 IJ O.S U O.SU O.SU
f l,|.,f.>l.eiiscue O.S II 0.12; O.SU 0.5 IJ
Kiliylhenicne 1.5 I.I O.SU O.SU
Stymie 2.6 1.8 O.SU O.SU
Vylcii« 0"i»l) fl-S U fl.5 U 0.5 U O.S U
Afulyle concent rations in micmgrimi per liter (pirU pcrhitlinn |pp)>|>.
An Cnmpnunil concent ml ion wli ilelermineil *( k iccondtry dilution fkctor.
J fliiirn&lcjl rcinH,
2.5 11.1
2.5 IJ
2.5 U
2.5 II
2.1 U
1011
2.5U
2.511
2.5 U
2.5 U
2.5 IJ
2.5 U
10 U
2.3 U
2.5 U
2.5 U
2.5 U
2.5 U
2.2 J
2,5 U
' 2.5 IJ
3.5 tl
2.5 IJ
2.511
10 U
fij
2.5 U
O.S 1
2.SU
2.5U
2.5 U
2.5 U
2.SU
nnvironmcnlkl

O.SU
0,5 U
Oi.U
0.5 U
a.S U
2 U
0,5 U
0.09 J
O.IS J
0.4 J
O.tl J
0.5 U
3U
O.SU
O.SU
0.5 U
0.37 J
O.SU
3.4
O.SU
O.S U
O.S U
n.i u
n.s u
;u
2 U
O.S U
0.83
0.5 U
O.S U
O.IU
0.5 U
o.s u
Protection

0.5 U
0.5 U
O.SU
O.S U
O.SU
2U
O.SU
0.5 U
0.05 1
0.5 U
0.05 J
O.SU
2U
0.5 U
O.SU
O.SU
O.SU
O.SU
0.83
0.5 U
O.S U
a. i u
0.5 If
o.s u
2U
"> U
0~5 U
0.13 J
0.5 U
0.5 U
0.06 J
O.IU
O.SU
O.SU
O.SU
O.SU
O.SU
0.5 U
2U
0.5U
O.SU
O.SU
O.SU
0.5 U
O.SU

o'su
O.SU
O.SU
0.5 U
0.5 U
O.liJ
O.SU
O.S U
0.5 U
O.SU
0.5 UJ
2U
2U
0.5 U
0.5 U
0.6 U
O.S U
0.13 J
0.5 U
O.SU
O.S U
O.S U
O.SU
O.I U
0.5 U
2U
0.5 U
0.5 II
O.SU
O.SU
O.S U
O.S U
2U
O.SU
O.SU
o.s u
O.SU
O.SU
0.07 J
O.SU
0.5 U
0.5 U
• O.I U
0.5 UJ
2 U
2U
0.5 U
0.5 U
0.5 U
0.5 U
O.I U
O.S U
0,5 U
0.5 U
0.5 U
0.5 U
O.S U
0.5 U
2U
1 U
O.SU
O.SU
0,5 U
O.SU
o.s u
2U
O.S U
O.S U
O.S U
O.SU
O.SU
O.S U
O.S U
O.S U
0.5 U
O.SU
0.5 U
2U
2 U
O.SU
0.5 U
0.45 J
0.5 U
1.3
2.T
0.2 J
0.5 1!
O.SU
0.5 U
0.511
0.5 U
2U
O.S U
O.S U
O.S U
O.SU
O.SU
O.S U
2 U
O.S U
0.5 U
0.5 U
0.5 U
O.S U
O.S U
O.SU
0.5 U
0.5 U
0.5 U
O.S U
2 U
2 U
0.5 U
0.5 U
O.S U
O.SU
0.5 U
O.S U
O.S U
O.SU
0.5 U
O.SU
O.IU
0.5 U
2 U
0.5 U
O.S U
0.5 U
O.SU
O.S U
a.s u
2 U
0.5 U
O.SU
O.S U
O.S U
0.5 U
o.su
O.SU
O.I U
O.S U
O.S U
0.5 U
2U
2U
0.5 I)
O.S II
O.S U
0.5 U
O.SU
O.SU
O.IU
O.I II
O.I IJ
O.I U
O.I U
0.5 tl
2 U
0.5 II
O.Stl
0.5 tl
O.SU
0.5 U
0.5 U
2 U
O.SU
05 U
O.S U
O.I II
0.5 tl
0.5 U
O.SU
0.5 II
0.5 tl
O.S U
0.5 U
1 U
2 U
0.5 U
0.5 II
a s u
0.5 U
0.5 U
0 S tl
O.SU
Agency mclhoclology.







II Tlic coimioiiiiil wk) krtkly/cil for, lint mil tlL-lecleJ it tlie corres|W>[iiliiig reporting limits.
\ic«le of previou* txnple. •



















-------
  T*l>tc   9     Concentration* f>( Volatile Organic Compound! in Crounttwiler Simplei Collected from January la Mirch 1992. OU II Remedial Invuligilion, Vega A let, Puerto Rico.
                          Simple ID: BVAW J006 DVAW 1007 BVAW 1(107  IWAW 1010  BVAW 2201  DVAW 1102  BVAW 1201  DVAW 1204  BVAW 1105  BVAW 1206  BVAW 2207 BVAW 1201 BVAW
                                    (M10)       (M10)       ne
1 .t ,2-Ti ichlnmclliine
lien /cue
cii- t.J-Oichlorupropene
rinxiioforin
-1 Mcil.yl 2 pciHnrmnc
MU'unmic
1 , 1 ,2,2-'l cllndjlunjcllianc

'IlilllCIIC
f.'Miinilicnicnc
liihylliciucnc
Slyronc
X'ylciict (mini)
O.S II
O.S U
O.S U
0.5 U
0.5 U
'2 U
0.5 U
O.S U
11.5 II
0.5 U
O.SU
fl.S U
2 II
0.5 U
0.5 U
O.SU
O.SU
0.5 U
0.5 U
O.S U
O.S U
0.5 U
0.5 U
0.5 U
2U
2U
0.5 U
0.5 U
0.2 J
0.5 U
n.su •
o.S u
0.5 U
Analylc concentrations in micmgrnrni per liter
Ajulyici were (wrfuninul hy varitNii inalylical
I) f?uui|»minil concentration wai
i niinntlcil result.
O.SU O.SU O.SU
O.SU O.SU O.Stl
o.s u o.s u o.s u
O.S UJ O.S UJ 0.5 UJ
O.S U 0.5 U O.S U
2IJ 1U 2 U
O.SU O.SU O.SU
O.SU O.SU O.SU
n.s u o.s u o.s u
o.s u o.s u o.s u
o.s u o.s u o.s u
O.S U O.S U 0.5 U
2U 2 U 2U
0.5 U O.S U O.S U
0.5 U O.S U O.S U
O.SU' O.SU O.SU
O.S U 0.5 U 0.5 U
0.5 U 0.5 U 0,5 U
O.S U O.S U 0.5 U
0.5 U O.S U O.S U
o.s u o.s u o.s u .
O.S U 0.5 U 0.5 U
O.S U 0.5 U O.S U
0,5 UJ O.S UJ 0.5 U
.2 U 2U 2 U
2 U 2 U 2 U
0,5 U 0.5 U 0.5 U
O.SU 0.5 U O.S II
O.S U O.S U O.S U
o.s u o.s u o.s u
0.5 U 0.5 U 0.5 U
O.S U 0.5 U O.S U
O.SU O.SU O.SU
O.SU
O.S U
0.5 U
O.SU
OSU
2 UJ
1 U
O.SU
o.s u
o.s u
O.SU
O.SU ,
2U
o.s u
o.s u
O.SU
osu
o.s u
0.31 J
0.5 U
O.S U
0.5 U
0.5 U
O.SUJ
2U
2 U
O.S U
0,5 U
O.S U
0.5 U
0.82
t.6
0.5 U
O.S UJ
o.s u
O.SU
o.s u
o.s u
2U
0.86 UJ
O.SU
0.5 U
O.S U
O.SU
O.S U
2 U
0.5 U
O.SU
0.5 U
O.SU
O.SU
0.29 J
O.S U
O.SU
O.S U
0.5 U
O.SU
2U
2 U •
O.S U
0.5 U
O.S U
0.5 U
0.74
1.2
0.06 J
O.S UJ
0.5 U
0.5 U
O.S U
O.SU
2U
2.7J
O.S U
0.5 U
0.2 J
O.SU
O.S U
2U
O.SU
O.SU
O.S U *
O.SU
O.SU
1.6
O.SU
O.SU
O.S U
O.SU
o.s u
2 U
1U
0.5 U
0.5 U
O.S U
0.5 U
1.4
2.2
O.OS J
o.suj
o.su
O.SU
O.SU
O.SU
2U
O.SUJ
0.55
0,08 J
0.51
O.SU
O.SU
2U
O.SU
0.5 U
O.SU
O.SU
0.5 U
36
0.5 U
0.5 U
O.SU
O.S U
O.SU
2U
2 U
0.5 U
1.3
0.5 U
O.SU
'0.41 J
0.29 J
O.S U
O.S U
O.S 1)
O.S U
O.S U
O.SU
2 UJ
1.3 U
0.31 J
O.S U
0.35 J
O.SU
O.S U
2 U
O.S U
O.SU
O.S U
0.5 U
0.5 U
22
O.SU
0.5 U
0.5 U
O.SU
O.S UJ
2U
2U
O.S U
0.72
O.S U
0.5 U
0.39 J
0.4 J
O.SU
O.SUJ
0.5 U
O.S U
0.5 U
O.SU
2 U
O.SUJ
It
1.5
3.1
O.SU
O.S U
2U
O.SU
O.SU
O.SU
O.S U
0.5 U
370 D
O.SU
0.5 U
O.SU
O.SU
.0.5 U
2 U
2U
O.S U
IS
O.S U
O.SU
O.07 J
0.5 U
0,5 U
O.S UJ
O.S U
O.S U
O.SU
O.SU
211
2.7 J
4
0.7
3.2
o.oa;
o.s u
2 U
o.s u
O.SU
o.s u
0.5 U
O.SU
390 D
O.SU
o.s u
0.5 U
O.SU
0.5 u
2 U
2 U
0.5 U
7.6
0,5 U
O.SU
0.27 J
0.19 J
O.S U
O.SU
O.S U
0.5 U
O.S U
O.S U
2UJ
O.S U
270 DJ
20 J
28 J
t.ftJ
1.5 J
2 U
O.S U
0.08 J
OOS J
O.S U
O.SU
2800 DJ
O.S U"
-, ,
o's'u
0.5 U
0.5 UJ
2U
2 U
0.5 U
120 DJ
O.S U
O.S U
O.S U
O.SU
O.SU
0.5 U
o.su
O.S tl
0.5 II
o.s u
21IJ
0.61 tl
iw m
U 1
181
I.I J
I.2J
2 U
O.S U
O.SU
0.5 U
0.5 U
O.S U
2100 DJ
O.SU
2 1
05(1
OSU
O.S 111
2 II
2 II
O.S U
89 1)1
0 5 U
0.5 U
0.37 J
0 23 J
0.5 U
(pirli per hillion jppl))). ' •
jultcontraclon using ilondard U.S. Environmental protection Agency methodology.
determined at a iccomlary dilution factor.


II • Tlic conipoiniil wui • nnly/cil fur. Inn mil ilelccl&l >1 llic cnrTcsnonilinj; reporting;
• I Atl ii'|>ii\iit|' tiiniii ruiicd iluc li> iiiHlriK interference).

limit!.
















       |
-------
T*l>lc  9     Concenlrtlioni of Volitile Organic Compound* in Groimdwater Samples Collected from Jtnuiry la March 1992, OU II Remodiil Investigation, Vcg* Allt, Puerto Rico.
Simple ID: RVAW 2209 GAM Cish El Mom
(Mil) + Curry (tO)
(67)
Arulyte Dik: !9-Ftb-92 J9-J»n-92 JS-M.T-92
rttlurometlinne 0.5 UJ 0.5 U 0.5 U
(I, 	 niiiciliatii: 0.5 tl 0.5 tl 0.5 U
Vinyl thliKiilt 0.5 U 0.5 U 0,5 U
Cliturucilmiit 0.5 U 0.5 U 0.5 U
Mcthylene tMnriJe O.SU O.MJ O.SU
Acetone 211 2 U 2 U
Curium Jiiulfidc 0.5 UJ 0.5 U 0.66 U
1 , 1 -Dk-lihuiictlirne 160 D O.SU 3.8
1 l-lJithii.fc.cllmnc 5.3 0.07 J 0.24 J
I.J UitlilmutlliCHC (ciu/lioili) 16 O.Oaj 0.51
riilinlif.mil 0.33 J 1 > O.t J
1,5 iJltM.id.ctl.niiG . 1.6 Ci.5 II 0.5 tl
Mtut 	 ic 0.88J 2U 2U
MJ-l'tichloroeiUne O.SU O.SU O.SU
Caflum iclr.cliliif jdc O.SU O.SU O.SU
llrtirnoJiclilnrcimclliine 0.5 II 0.5 U 0.5 U
1.2 DitMmopmpgite O.SU 0.06 J 0.22J
iMiiis.l.J-Diddiirftpriincnc O.SU O.SU O.SU
iiitlili.rocllicnc 570 1) 1.8 5. A
DitirotiiocliKirumcilinnc 0.5 U 0,5 UJ 0.5 U
1.1,2 TiicliliifiiilliMie O.SU O.SU O.SU
flcnjcne 0.23 } O.S U O.S U
cif-],3.Dicli|nronrapcne O.SU O.SU O.SU
Urr»r>n 0.5 U 0.5 UJ 0,5 UJ
•TMtihyl 2-pciiimitnic ' 2 1) 2 UJ 2 U
2 llcitnmie 2IJ 2U 2U
1,1,2.2 .Tcirichtnriwihftfie O.SU O.SU O.SU
ItMottilojiictfium; • 11 0.58 3.6
Ir/luti." 0.6 U O.S U 0.5 U
(Vlil.m.liciwcnc OS U O.S U 0.5 U
liihvlliciucnc 1.3 0.5 U 0.5 U
Siy/cne 0.5 U O.S U 0.5 U
Xyleiies (nil*!) 0.52 0,5 U 0.5 U
El Mom
(BO) PR

25-Mir-92
O.SU
0.5 U
0.5 II
O.S U
0.5 U
2 U
0.5 U
4
0 "*4 J
0^56
0.00 J
o.su
2 U
0.5 U
O.SU
O.S U
0.26J
0.5 U
6.4
O.SU
O.S U
0.5 U
O.SU
o.s UJ
2 U
2 U
0.5 U
3.8
0.5 U
.0,5 U
0.5 U
0.5 U
O.S U - .
Forcinl
(74)

15 Jin 92
O.SU
O.S U
O.S U
0.5 U
0.5 U
2 U
0.5 U
0.5 U
O.S U
O.I7J
O.OB J
OS U
2U
O.SU
O.S U
O.S U
0. 14 J
0.5 U
1.9
O.SUJ
O.S U
' 0.5 U
O.SU
O.SUJ
2 UJ
2U
0.5 U
0.43 J
O.SU
O.SU
O.SU
O.S U
0.5 U
Antlytc concentrations in micrognmi per liter (p«rti per billion |ppb|). • •
Annlyici were nerfuniied by vinoui itiilylicil subcontractor! tiling »Und*rtl U.S. Environment*!
QE-1 (78)


31-J.n-92
O.SU
0.5 II
O.SU
O.SU
0.5 U
21)
0.5 U
0.66
I A
1.3
0.43 J
0.5 U
2 U
O.S U
O.S U
O.SU
O.SU
O.SU
4.4
O.SU
O.S U
0.5 U
O.SU
O.SU
2U
2U
0.5 U
3.5
0. U
0. U
0. U
0. U
0. U
GE-B3
(IOJ)

J 4 Fin 92
0.5 U
a. s ii
0.5 U
O.S U
O.S U
2 tJ
0.5 U
0.21 J
052
1
0.28 J
O.SU
2U
0.05 J
O.S U
0.05 J
O.SU
O.S UJ
4.7
O.SU)
O.SU
0.5 U
O.SU
o.su;
2UJ
2U
O.SU
2,2
0.5 U
O.SU
O.SU
O.S U
O.SU
Gnnui
LtnJit 4
(119)
lS-Jtn-92
O.SU
0.5 tl
O.SU
0.5 tJ
O.S U
2 U
O.SU
O.SU
0.5 U
0.17 J
0.11 J
O.i U
21)
O.SU •
0.5 U
O.SU
O.MJ
O.S UJ
1.5 .
O.SUJ
0.5 U
O.SU
O.SU
O.SUJ
2UJ
2U
0.5 U
0.65
0.5 U
0.5 U
'O.SU
0.5 U
O.SU
tlirnun f
(104)

lO-Jin-92
O.S U
0.5 U
0.5 U
0.5 U
0.5 U
2U
O.SU
0.32 J
0.26 J
0.76
O.SU
O.SU
21)
O.SU
O.S U
O.SU
O.SU
O.SUJ
3.3
O.SUJ
0.5 U
O.SU
O.SU
O.SUJ
2 UJ
2 U
0.5 U
4
O.SU
0.5 U
0.5 U
O.S U
0.5 U
lltmua 2
(105)

20- Jin 92
O.S U
0.5 U
0.5 U
O.S U
0.5 U
2 U
O.SU
0.21 J
0.21 J
I.I
O.SU
0.5 U
2U
O.S U
O.S U
O.OSJ
O.SU
0.5 UJ
2.8
O.SUJ
O.SU
O.S U
O.SU
O.SUJ
2UJ
2 U
O.SU
11
0.5 U
O.S U
0.5 IJ
O.S U
O.S U
rr-3 (159)


is-i,^
o.su
Q.S U
O.SU
O.S U
0.5 U
2 U
O.SU
O.S U
O.S U
0,5 U
0.24 J
O.SU
2U
0.5 U
O.SU
0.5 U
O.SU
o.su
O.S U
0.5 UJ
O.SU
O.S U
0.5 U
o.suj
3UJ
2 U
O.S U
0.5 U
0.5 U
O.S U
0.5 U
0.5 tl
O.S U
U
Ciltndrii
(«w)(324)
19-Jio-n
O.SU
0.5 U
0.5 U
O.S U
0.14 J
2U
O.S U
O.SU
0.5 U
O.S U
0.5 U
O.S U
2U
O.S U
O.SU
0.5 U
O.SU
O.SU
O.SU
0.5 UJ
O.SU
0.5 U
O.SU
0.5 UJ
2UJ
2U
0.5 U
O.OSJ
O.SU
O.SU
O.SU
O.SU
O.SU
u.
Putrtoi
(•0
19 J»n9
O.SU
0.5 tl
0.5 tl
0.5 U
O.I J
2 U
0.5 U
O.S U
. O.S U
Q.J9 J
05 IJ
0.511
•> [f
0*511
0.5 U
O.SU
O.tfiJ
o.s u
2.3
O.SUJ
O.SU
0.5 U
0.5 II
0.5 in
2UI
211
0.5 tl
O.J7 J
0.5 1)
0.5 U
0.5 U
0.5 IJ
O.SU
Protection Agency methodology.
|> Cnitipound concentration w»j determined it • tccondiry dilution Tudor.
J nuiintteil remit.
II Ttie cuinpoiirul WD in*ly7«l for, but nnl ifctcclcij il the '-irejpom
<1 All ic|Ntiliii|; limit) riitcil due lit innlrix inicrfcreiicei.
i All (ciHirtiim litnili ikisal due In ltii>ti level* of flitter tnilylei
V Itcsull rejected. *
1'U I:ie1il rejiltCBtc n'f prcviaiii itmplc.
ling reporting


limits.



























-------
T.l.lc  9-.   Conccnlrilioni of VoUtile Orginic Compounds in Groumlwiler Samplcj Collected from January lo Mirch 1992, OU It Remedial Inveatig.lion, Vega AlU, Puerto Rieo.
                                                                                                                                                                           18
Simple ID; Mitmyo 1 Mifutyo 2 Mifiifyo 3 Miginyo 5
{')!} (07) FR (161) (1 1)


Arutyie Ditc: 2l-J*n-91 2l-J»n-9J lfi-Jin-92 19 J.n-92
Cltlntomcititne O.S U O.S U 0.5 U 0.5 IJ
llrormimcllinnc 0 5 U 0 5 (J 0.5 U 0.5 t)
Vinyl irliluride 0.5 II o!s U O.S U O.S U
Cliliiructliine 0 S U • 0 5 U 0.5 U O.S U
Mctltylcnc chloride O.SU O.SU O.SU OI2J
AtcKine 2 U 2 U 2 U 21)
c.'uFliiin duulfiile 0.61 U O.S U 0.5 U 0.5 U
1 l-l>ichl<>mcihcne 0.5 U 0.5 U 0 < U 0.5 U
• I l-bkhl'iriiciiisiie 0.5 IJ 05U t , J O.SU
l!M>kliliiiiic4hciic{cii/iTiiiii) 0.2 J O.J9J O.j U 0.05 J
riilnrufnfm O.OB J 0.06 J 0.06 J 0.5 U
t,2-l>it.lil>iriH:lliirie O.SU O.SU O.SU O.SU
Ml.ji.ii.tne . 2 U 2U 2U 2U
l.l.l-TricltiWactlianc O.SU O.SU O.SU O.SU
f'n.l.nn icir.clilutiJe 0.5 U 0.5 U 0.5 U 0.5 U
flrumodichloromcilitne 0.5 U O.S U 0.5 U 0,5 U
1,2-Dichluroprunine O.SU O.SU O.SU O.SU
imrii-l.a-UicluWnpropene O.SU O.SU O.SU O.SU
rricrMornctlienc 1.2 1.1 1.6 0.33 J
Oil.ruinoclilurnmethane 0.5 U 0.5 U O.S UJ 0.5 UJ
1 1,2-Tricliloruetliine O.SU O.SU O.SU O.SU
tV.i/ene 0.5 IJ 0.5 U 0.5 U O.S (J
cii-l,J-nk.Mori>priipene O.SU O.SU O.SU O.SU
li,,»m<.f,,im 0.5 U 0.5 U 0.5 UJ 0.5 UJ
•) Mci|). ' : .
Aiulyict were performed liy vanoui analytical iijlicnnl radon imng iiindard U.S. Environmental Protection Agency methodology.
D Cuinpotirul conccnlrilion vv« determined at a leeonUary dilulinn Tudor.
1 liitiinilcd remit.
II '] lie compound wa> ina1y7ctl fur. lint not clctecled al (lie correiponilinc reporting
il All ic|»>rtjii£ liiniii ruiiol due in imirix inlcrfcrcncei
i All iciHiittrii; liniiu niitil due In liirli Icvcli of oilier anilylea.
It Kciidl icicclc'l.
l-'lt Viclil ic|ilic*tc itf prcvinii) «mple.


liiniii.











































-------
Tulile  9     Concentration* of Votdile Organic Compound* in Groundvealcr Simple* Collected from January lo Mirth 1992, OU II Remedial Investigation. Vega Alia, Puerto Rico.
Simple ID: P-5 (45) Pnndtrou Reyei (43)
«9>

A«lrt« Did: 30-Jin.92 3l-Jin-92 19-Jin 91
rj.lnromeihane O.S U 0.5 U 0.3 U
tlr»nicil»ne O.SU O.SU 0.5 U
'Icliithluriicllicric 3.6 J 7 0.76
i.,tiici,e J.AJ o.su o.su
. UilnM.hcn/cnc 0,5 U 0.5 U 0.5 U
IJI.yJl.eiuenc 0. 14J . O.SU O.SU
Siyrcne 0.5 U 0.5 U 0.5 U
Xylcnci (|,,lnl) IJ O.I2J O.SU
uses
Sibina
lloyoi (32)
»•»•-«
O.SU
0.5 t)
0.5 U
0.5 U
0.5 U
2 U
0.5 t;
O.S U
0.511
o.s u
0.5 U
O.SU
2 U
O.S U
0.5 U
O.SU
O.SU
o.su
0.2 J
0.5 U
O.SU
0.08 J
0.5 U
0.5 U
O.B4 J
2 U
O.SU
O.OB J
0.5 U
O.SU
O.SU
O.SU
0.08 J
SlbllU
lloyot 1
C73)
2l-Jan-92
O.SU
O.SU
O.SU
O.SU
O.S U
2 U
0.5 U
0.5 U
0.5 U
0.5 U
O.SU
0.5 U
2U
0.5 U
O.SU
O.SU
O.SU
0.5 U
0.5 U
OSU
O.SU
0,5 U
0.5 U
o.su
2U
2U
O.S U
0.5 U
0.5 U
O.SU
0.5 U
0.5 U
O.S U
Analytc concent ralioni in niicrogrami per liter (pant r-.i billion fppb)). • . •
Anolyiei were performed hy vanntu analytical luhcc.iiracton unnfi ttandarU U.S. Environmental
Sintt An*
(101)

rt.|..-9i
O.SU
0.5 U
0.5 U
0.5 U
0.14 J
2 U
O.SU
0.12J
0.5 U
0.17 J
O.SU
0.5 U
2U
O.SU
O.SU
O.SU
0.5 U
O.SU
2.1
O.SUJ
O.SU
O.SU
O.SU
O.SUJ
2UJ
2U
0.5 U
0.28 J
O.SU
0.5 U
O.SU
O.S U
0.5 U
Sinn Ana
(IQI)FR

)9-ftrt-92
O.SU
O.SU
O.S U
0.5 U
O.SU
2U
O.SU
O.I2J
O.SU
0.19J
O.S U
0.5 U
2U
O.SU
O.SU
O.SU
0.5 U
O.SU
2.1
O.SUJ
0.5 U
0.5 U
O.SU
O.S UJ
2UJ
2U
O.SU
0.29J
0.5 U.
' 0.5 U
O.S U
0.5 U
0.5 U
Stcui ROM
(61)

IS-J.n-93
O.SU
0.5 U
0.5 U
O.SU
O.SU
2U
O.S U
0.72
O.SU
0.36 J
O.I8J
•0.5 U
2 U
O.SU
0.5 U
O.SU
0.22 J
0.5 U
7,8
O.SUJ
O.SU
0.5 U
O.SU
O.SUJ
2UJ
2 U
0.5 U
0.06 J
O.SU
O.SU
0.5 U
0.5 U
O.SU
Suit Rota
11(61)

19M.r-92
O.SU
O.SU
0.5 U
O.SU
O.SU
2U
0.5 U
0.69
O.SU
0.38 J
0.05 J
O.SU
3U
O.SU
O.SU
O.SU
0.24 J
O.SU
7.7
O.SU
O.SU
O.SU
O.SU
0.5 U
2U
2 U
0.5 U
0.05 J
0.5 U
O.SU
0.5 U
0.5 U
O.SU
Trop!
Giriletu
(163)
IS-J»-92
O.SU
O.SU
0.5 U
O.SU
O.SU
2U
O.SU
O.SU
O.S U
0.5 U
O.SU
0.5 U
2U
O.SU
O.SU
O.SU
O.SU
O.SU
O.SU
O.S UJ
0.5 U
O.SU
O.SU
O.SUJ
2 UJ
2 U
0.5 U
0.5 U
0.5 U
0.5 U
O.SU
O.S U
O.SU
Vc» AJu
1 («>

ll-Khr-92
O.SU
O.SU
0.5 U
O.S U
O.SU
2UJ
0.5 UJ
O.SU
O.SU
O.S U
0.34 J
O.SU
2U
O.SU
O.SU
0.05 J
O.SU
O.SU
0.121
O.SU
O.SU
O.S U
0.5 U
O.SU
2U
2U
O.SU
0.09 J
O.SU
o.su
0.5 U
0.5 U
0.5 U
Boole
Blink

19-1.0-97
O.SU
0.5 U
o.su
O.SU
O.SU
1.5 J
0.39 J
0.5 U
0.5 U
O.SU
O.SU
0.5 U
2U
0.5 U
O.SU
O.SU
0.5 U
O.SU
O.SU
O.SU
O.SU
O.SU
0.5 U
O.SU
2U
2U
O.SU
• o.su
O.SU
O.SU
0.5 U
0.5 U
O.SU
FuM
Bltnk

IS-Jin-9]
O.SU
O.SU
0.511
0.5 U
O.SU
2U
0.13 J
O.SU
O.SU
0.5 U
0.5 U
0.5 U
2U
O.S U
0.5 U
O.SU
0.5 U
0.5 IJ
0.5 U
0.5 U
0.5 U
0.5 U
0.5 U
0.5 U
2UI
2U
O.S U
0.5 U
0 12 J
O.S U
0.5 II
0.5 U
O.OB J
Protection Agency methodology.
1) Compound concenlralinn wai determined at a teeondary dilution ficlor.
1 1 Ttic compound wn analyzed for, hut pnl detected at the corresponding reporting
il All icpiiniut; limits railed due In matrix inlcrfcrcncei.
j All HMvmtiiip limit) riiicd due lit liijjh level) nf other analylci.
li Iteiiill rejected.
l-'lt rielil replicate ofprcvinui lample.


limits.



























-------
Ttlitc   9    Cnnccnirtiinni of VoUlile Orginic Compound! in Groundwiler Samples Co Heeled from Jintiary lo March 1992, OU II Remedial Investigation. Vega Alia, Puerto Rico.



Arulyle

r!ht<*f(ifnetliine
htnliHMfietltinc
Vinyl chloride
Chlonxuttunc
Methylcnc chloritle
Ai^cJutic .
Cifhon disujfide
I.I' Die Municilicnc
1 1 • llicjilt'ri'ciliuiic
Simple ID: Field Field Fitld
Dlink Dl*nk Blink -

Due: 22-lin-92 29-Jan-tt Ji!H»a-«
1
0.5 III O.SU O.SU
0.5 (1 05 U O.S II
0.5 U 0.5 'J O.S II
O.S U 0 j U O.S U
0.5 U 0.5 U O.S U
2 UJ 2 U 2 U
0.5 U 0.2 i 0.96
0.5(1 O.SU O.SU
O.Stl O.SU O.S II
l,2-J>ii.]i|iir> O.SU O.SU O.SU
riiliifufufin
1,2-llithlnriiclhnnc
1 llulnniiiic
I.l.l-Trkiitofoelhane
Curlxm letfieliliiriile
UriunoJii. Moroni cdione
t ,2-Dichlufopfupmc
(mm- 1,3-Divhlucorirnpcnc
TrtclilornelTienc
r)ilirni»ai.'hjoromeih*ne
1 . 1 .2-T(iclilnn>clltiiiic
licHicnc
eis- 1 ,3-Dklilornpropene
[trnnioform
•l-M<: '1
o.s u o.s u o.s u
Field
Blink

3l-Iin«

O.SU
O.SU
O.S U
O.S U
O.SU
2U
0.22 J
O.S I)
O.SU
o.su
O.SU
O.S II
2U
o.s u
o.s u
0.5 U
O.SU
O.SU
o.su
o.su
0.5 U
o.s u
o.su
o.su
2U
2U
O.S U
o.s u
0.06 J
o.s u
o.su
o.su
o.s u
Field
nhmk

3-Feb-92

O.SU
O.SU
O.SU
O.SU
O.SU
7U
0.47 J
O.SU
n.su
o.su
o.su
o.s u
2 U
o.su
o.s u
o.s u
0.5 U
o.s u
o.s u
o.s u
o.s u
o.s u
o.s u
o.s u
2U
2U
o.s u
o.su
o.su
o.su
o.s u
o.su
o.su
Field
lll.nk

4-PeH

0.5 U
O.S U
O.SU
Field
Blink

>2 S-Feb-92

O.SU
O.SU
O.S U
O.S UJ O.S U
5
1 U
0.31 J
O.S U
o.s u
o.su
0.0* J
o.su
2U
o.su
o.su
o.su
0.5 U
o.s u
o.su
o.su
0.5 U
o.s u
o.SU
O.SUJ
2 U
2 U
O.S U
o.s u
O.ISJ
o.s u
0.3 U
o.su
O.I6J
micrognmi per liler (partj per billion |ppb|).
by vtrmni analytical mhconlractorj using ilindanl U.S. environmental Prolcclion
I) (TitmpnuiuJ cnncentration wai d.elcrmined nl a tccondary dilution
I l:nnniic
-------
 Table    0    Concentration! of Volilile Orginic Compounds in Groundwiler Simple! Collected from Jtnuiry lo March 1992, OU II Remedial Investigation, Vegt Alii, Puerto Rico.
                                                                                                                                                                                     IHgell


Anilyic
Chtiirdmellionc
liriuiMiuicilinjitf
V(nyl cl l»n.Mrn|>ri>ptiie
TrivMurocihenc
fjilirumudiloroni ethane
1,1.2-TriclilofOetliane
llctt/cuc
tn 1 .3 DiLlilnropfOptne
Itmmoriirin
4 Mmliyl-2-pentiimine
2-llciBnnnE
1,1 .2.2-TcUachlnrnclliane
'1 cirptlilctHicthcnc
Itilue-ne '
f.'hluiblicnicnc
l:iliylhen/etic
?
!>iy[i:nc
X'ylenet (tmil)
Anilyle concenlruliuni i"
Analyses were perfoniiol
Simple ID: Field Field Field
Illiiik Illink Illiuk
Dilc: H-Feb-91 U-Ftb-92 !9-Feb-91
O.S U 0.5 UJ i U
0.5 It O.S U 0.5 tl
0.5 U 0.5 U O.S U
O.S U 0.5 U 0,5 U
2.8 0.15 J O.I9J
2 U 2 U 2 UJ
0.29 1 0.64 J 0.25;
0.5(1 O.SU O.SU
0.5 II 0.5 tl 0.5 U .
iuO M.S (1 O.I U 0.5 U
o.su o.su o.su
0.5 (J 0.5 U O.SU
2 U 21) 2 U
0.09 J O.SU O.SU
0.5 U O.S U 0.5 U
0.5 U O.S U O.S U
0.5 U 0.5 U 0,5 U
O.SU 0.5 U O.SU
0.5 U 0.5 U 0.5 U
0.5 U 0.5 U O.S U
0,5 U O.S U O.S U
0.5 tl 0,5(1 O.SU
0,5 U 0.5 U 0.5 U
0.5 U O.S U 0.5 U|
211 ,2U 2U
2U 2 U 2 U
O.S U O.S U O.S U
(I.SIJ 0.5 U 0.5 U
O.SU O.SU O.OdJ
O.S U 0.5 U 0.5 U
fl.S I) . 0.5 U O.S U
0.5 U 0.5 U 0.5 U
0,5 U 0.5 U 0.5 U
Field
Illink
20-Feh-91
O.SU
0.5 U
0.5 U
0.511
0.2 J
2U
0.3S J
O.SU
0.5 II
0.50
0.5 U
0.5 U
211
0.5 U
O.SU
0.5 U
O.SU
O.SU
o:s u
o.su
0,5 U
o.s u
0.5 U
O.S UJ
2U
2U
O.SU
0.5 tl
O.S U
O.SU
0.5U
O.SU
O.S U
Field
Illink
ll-Feb-92
O.SU
O.SU
0.5(1
O.SU
0.19!
2 II
0.75J
O.SU
0.5 U
O.SU
0.5 U
0.5 U
2 II
O.SU
O.SU
0.5 U
O.SU
O.SU
O.SU
O.SU
0.5 U
O.S U
o.su
O.S U
2U
IU
o.su
n.5 u
0.08 J
0,5 U
O.S U
o.s u
o.su
rmcrogrami per liter (parti per billion [pp!>|> ' .
liy various analytical luliconl melon using standard U.S. Environment*!
1) Compound concentration wuj determined at a secondary ditulion
1 Rktuniletl iciull.
II • Tltc compound waj *nilyre
-------
 T.bk   9     Cnnccn.ra.ion, of Vol.iilc Organic Compound, in Groimdwuer Simple, Collect from J.nu.ry lo M.rch 1992. OU II Remedial Invocation, Vega AH.. Puerto Rico.
                                                                                                                                                                                  P»ge 3
Simple
Aiulylc Rite:
CJiltif ornc Jlmnc
Ilff>ni4*incllianc
Vinyl tlilixjile
Clilufnetlibne
Mtiliylciii: dilnriile
A
Cnfhou ilisulfiJc
1 , J .|)iclih>rncllicjie
1 , 1 'IliL'lllulttCltKllle
1 .2 Uithli'iiKMlicnc (di/lrmii)
Oilnrnfiif m
l.2-I)kliluriiciliiiMC
?• JIuluiMjiii:
1. I,l-Thclili>roi:lli*nc
Cufltoii reiriclilutidc
flrnirmdkfilorrimclhine
1.2- Dichlofuprojmuei
(ruin- 1 , J-DicMurnjiropenc
'Irkliliiruclhciii:
(>iliruriiriclani:
1. 1 .2 Triclhlnfiicilmic
Hniutnc
(.ii l,3-l)iclili)fiiprnpcitc
hriiiniifiirm
-TMLlIiyl-3-perittiiitmc
2-1 (examine
1 ,1 .2,2 Ttllndilniocllmilc
'1 Clf •CltldMICllli^llC
lt>lllClie
CMuruherrscne
1 jliyllicniefic
Slyrcne
X'ylcnci (mill)
ID: FieM
Illint
S-Mtr-92
0.5 U
0.5 U
O.SU
O.S U
O.S U
i u
o.n j
0.5 II
0,5 II .
0.5 U
o.s u
o.s u
2 U
O.SU
O.SU
0.5 U
O.SU
0,5 tJ
O.S IJ
0.5 U
0.5 U
n.s u
O.S tl
OS IJJ
211
R
0.5 U
n.S U
0.07 J
o.s u
O.SU '
O.SU
o.s u
Field
liUnk
6-Mtr-9J
0 5 II
O.SU
0.5 U
O.S U
O.S U
2 U
0.46J
0.5 If
0 5 11
o.su
o.s ii
0.5 U
2 U
0.5 U
o.su
0,5 IJ
O.S U
o.s u
, 0.5 U
O.S U
o.su
0.5 U
o.s u
o.s uj
2 If
2 U
O.SU
0.' (J
r,.s u
o.su
o.s u
0.5 U
o.su
Field
Illicit
9Mir-91
0.5 U
O.S U
O.SU
O.S U
0.2BJ
2 U
0,75
0.5 U
0.5 II
O.S U
0.5 U
0.5 U
2 U
O.SU
O.S U
0.5 U
O.SU
O.S U
O.S U
o.su
0.5 IJ
0.5 tt
O.S U
0,5 U
2 U
2 U -
0.5 U
O.SU
0.5 U
0.5 U
O.S U
0.5 U
O.S U ,
FieU
|il*nk
lO-Mir-92
0.5 UJ
O.SU
0.5 U
O.S U
O.S U
2 U
0.33 J
O.S U
O.S If
0.5 U
O.S U
O.S U
2 U
O.SU
O.S U
O.S U
O.SU
O.S U
O.S U
0.5 U
O.SU
0.5 tl
0.5" IJ
o.su
2 II
2 U
. 0.5 U
O.SU
0.5 U
o.su
O.S U
O.S U
0.5 U
Field
Illink
1). Mir 92
O.S U
O.SU
0.5 U
O.S U
0.5 U
2 UJ
O.It J
O.S U
O.SU
0.5 U
0.5 U
O.SU
2 U
0.5 U
O.S U
O.S U
0.5 U
O.S tl
O.SU
0.5 U
0.5 U
0.5 U
0.5 U
O.S U
2 U
2U
O.SU
O.SU
0.00 1
O.S U
O.S IJ
o.s u
0.13 J
Field
lll.uk
!2-M»r92
R
R.
R
R
0.5 UJ
R
R
R
R
It
0.05 J
R
K
R
R
R
R
R
R
It
R
K
K
K
R
R
R
It
0.05 J
R
R
R
R
Field
llUnk
I3-M.(92
O.SU
O.S U
O.S U
O.SU
0.5 U
2 UJ
0.21 J
O.S U
O.S U
O.SU
O.SU
O.SU
2 U
O.S U
O.S U
0.5 U
0.5 U
O.S U
O.S U
0.5 U
o.s u
o.su
o.su
O.S UJ
2U
J U
-o.s u
o.su
0.1 U
0.5 U
o.su
o.su
0.5 U
Field
ni.nt
16-Mir 92
O.S U
o.su
o.s u
o.s u
o.su
1.3 U
O.SU
O.S U
O.SU
o.su
o.s u
o.s u
2U
O.SU
0.3 U
O.S U
O.S U
o.su
o.su
o.s u.
o.su
o.su
0.5 U
o.s u
2U
2 U
0.5 U
O.SU
O.S U
O.SU
• o.su
0.5 U
O.SU
Field
nitnk
17-M.r92
O.SU
0.5 U
0.5 U
O.S U
O.SU
2 U
0.23 J
O.SU
O.SU
O.SU
O.SU
O.SU
2U
O.SU
O.SU
O.SU
o.su
o.su
0.5 U
O.SU
o.su
O.S I)
o.su
o.s u
2U
2U
O.SU
o.su
0.06 J
o.su
o.s u
o.su
• o.s u
Field
ni.nk
U-M.r-92
0.5 U
O.Stl
O.S U
O.S U
0.26 J
2U
0.25 J
O.S U
O.SU
O.SU
O.SU
O.S U
2U
0.5 U
O.SU
O.SU
O.S U
O.SU
o.s u
o.su
o.s u
o.s u
o.su
0.5 U
2 U
2U
O.S U
O.S IJ
O.SU
0.5 U
O.SU
O.S U
O.S U
Field
Ul.nl
19 t.Iir-91
o.su
O.SU
0.5 U
O.SU
0.26 J
2U
0.54
O.SU
O.SU
O.SU
O.S U
O.S U
2 U
O.S U
O.S U
O.S U
O.S U
0.5 U
O.SU
O.S U
0.5 U
0.5 U
0.5 U
O.S U
2U
2 U
0.5 U
0.5 If
o.su
o.su
o.s u
o.s u
o.s u
Field
DUnk
20-M.r-91
0.5 U
O.SU
O.SU
O.SU
0.29 J
2U
0.44 J
O.SU
O.SU
O.SU
O.SU
O.S U
2U
O.S U
O.SU
O.SU
O.S U
o.su
0.5 U
o.s u
o.su
0.5 U
o.s u
o.su
2 U
2U
O.S U
0.5 U
0.06 J
O.S U
O.SU
0.5 U
O.SU
Field
DUnk
D-M*i-'.
0.5 II
O.S tl
0.5 II
0.5 U
0.5 U
21)
I.I
0.5 II
0.5 II
0511
OS II
O.SU
2U
0.5 If
O.S U
O.SU
0.5 U
0.5 II
O.S U
O.J U
o.su
o.s u
0.5 II
o.su
2tl
2 tl
0.5 U
0 5 If
0.16 J
0.5 II
O.S If
O.SU
0.14 J
Anulytc cunccnlnliont in micrognm* per liter  (nan« per billion (pphll             •  '
Aimlytci were performed liy v.no.u analytical  jiihconlnclon uiirtg tlindnrd U.S. Ermi

1)
                                                                            Environmental Protection Agency methodology.
       Compound conccalriliun wit determined m a secondary dilution factor.

Y      lii'.^'lK!1"1!!,*!" "'•'VI'1 f"r' '"" f"1! Jeiecied at I he cormpon.ting reporting limits.
• I      Alt ic|xjiiini; iniiii, ,«|jc,l dncl« mulrix tnlcr fcrunccj
|       All tcj-nlmi; liiinli i.],c
-------
Tahle   0    Concenlmlioni of Volatile Organic Componmlt in Grounitwaicr Sumplei Collected {mm January lo Mtrch 1992. OU II Remedial Inveitigtlion, Vega Alia. Puerto Rico.
                                                                                                                                                                    Pagel!
Simple ID: Field Field Trip Blink
Illink tllint
Aiulyw Due: 24-Mar-92 2i Mir-91 H-Jan-92
riilorumtihtne R R 0,S U
lllDMI.JCIIClllBJIC It R 0,5 U
Vinyl chloride It R O.S U
CliloriKlhtnc It R 0.5 U
Mtiliyfciicdilnriilc O.SUJ 0.67 UJ O.SU
Atcinoc It 1.3 J 2 U
(..il.nn Uiiulftitc 0.29J 0.3 |J O.I7J
1 |-Oiclilncucllicnc R It O.S U
j 1 Oiwlilttfucllnpic It It 0.5 11
I.I -Divhlufiutlicne (vif/uifls) K ft O.SU
riitiniifoim 0 05 J R O.S U
I.MJKlilnroelliniic If It O.SU
MtuInnOMc It It 2 U
i.l.l-Tfichloroeihane O.OSJ R O.SU
C.rlion icirachloriilc R R 0.5 U
[Jroniodielilorarncihanc R R 0.5 U
l.2-Diclil«rnpiupanc -ft R O.S U
imrii-l.3-Didilnfopropene R R O.SU
Tricliliirocilicna R R O.S U
Diliromoctiluronielhane • K R O.S UJ
1.1.2-TrieMoniclhMic R R O.SU
lament 0 05 J It 0.5 U
tii-I.J-Oichloruprupene ' R K O.SU
rironiiiform (t ft O.S UJ
•1 Mcihyl 2 pciiiht 	 c It R '/ |;J
2-llciDiiime R R 2 U
1,1,2.7 lutiatlili.rncllintic It tt O.SU
Ulrnchlurriclhcnc R It O.S U
I..IIICMC 0.17 J 0.2IJ 0.09 J
C|,t., M.l.i; n/c nc It It 0.5 U
l-iliylliciucnc It R 0.5 U
Siyiene . R R 0.5 U
Xricnci («.i.i) o.u o.i8 J . o.su
Trip Blink
A
IJ-Jln92
0.511
O.SU
0.5 tl
O.S U
0.5 U
2 U
0.87
O.SU
0.5 U
0.5 U
0.51!
0.5 U
2U
0,5 U
0.5 U
O.SU
O.SU
O.S UJ
O.S U
O.SUJ
0.5 U
o.s u
o.s u
0.5 UJ
2UJ
2U
0.5 U
0.5 U
0.14 J
0.5 IJ
O.S U
0.5 U
0.5 U
Trip BUnk
B
1 5 Jin 91
O.SU
O.S II
0.5 U
O.S U
O.SU
2 U
0.47 J
0.5 U
0.5 IJ
0.5 U
0.5 U
O.S U
2 U
O.SU
O.SU
O.SU
O.SU
O.SUJ
O.S U
O.S UJ
o.s u
0.5 U
O.S U
0.5 UJ
2 UJ
211
0.5 U
0.5 U
0.14 J
0,5 U
O.S U
0.5 U
O.SU
Trip Bli

nk Trip Blink

l6-Jin-92 U-J.n-92
O.SU
G.5 U
0.5 U
O.SU
0.5 U
2U
0.4 J
O.SU
n.s u
o.s u
O.SU
o.S u
2U
0.06 J
O.SU
O.SU
O.SU
0.5 UJ
o.S u
O.SUJ
o.s u
O.OSJ
o.s u
0.5 Ul
2 UJ
2U
o.s u
0.5 U
0.14 J
0.5 U
0.5 U
0.5 U
0.06 J
Anilyte concentration) in microgrami per liier (parti per billion lppb|),
Analyse! were performed l>y vtnnus analytical lubconl radon ujmg ilaniUrtt U.S. En'virnnmcntal Protection
O.S U
0.5 U
0.5 U
0.5 U
O.SU
2 U
0.42 J
O.SU
O.S U
O.SU
O.I9J
O.SU
2 U
0.07 J
O.SU
O.SU
0.5 U
O.SU
O.SU
O.SUJ
o.s u
0.5 U
O.SU
0.5 UJ
2 U
2U
O.SU
O.SU
0 34 J
O.SU
O.SU
O.SU
O.SU
Trip Blink

20-). n-92
0.5 U
O.S U
O.SU
O.SU
0.27 J
111'
0.13 J
O.SU
0.5 U
O.S U
0.13J
0.5 U
2U
0.06 J
O.SU
O.SU
O.SU
O.SU
O.S U
O.SUJ
o.s u
0.5 U
0.5 U
0.5 UJ
2 UJ
2U
0.5 IJ
O.S U
O.M J
0.5 U
0.5 U
O.SU
O.SU
Trip Blink
A
20-J*n-92
O.SU
0.511
O.S U
O.SU
0.27 J
IlJ
0.34 J
0.5 U '
0.5 U
O.SU
0.23 J
O.SU
2U
0.06 J
O.SU
O.SU
O.SU
O.S U
O.S U
O.SUJ
O.SU
0.5 U
O.SU
O.SUJ
2UJ
2 U
O.S II
O.S U
O.I J
o.s u
o.su
0.5 U
o.s u
Trip Cfint

2l-Jan-92
o.s u
0.5 U
0.5 U
O.SU
O.SU
2 U
0.54
O.SU
0.5 U
O.S U
O.SU
O.SU
2U
0.09 J
O.SU
O.SU
O.SU
O.SU
O.SU
O.SU
o.s u
o.su
O.SU
o.s u
2U
2 U
O.S U
O.S U
0.14 J
O.SU
0.5 U
0.5 U
O.I j
Trip Blank

22-Jin9I
0.5 U
0.5 U
O.S U
O.S U
O.S U
2 U
0.27 J
O.SU
O.SU
0.5 U
O.SU
O.SU
2 U
0.09 J
O.SU
O.SU
O.SU
O.S U
O.SU
O.SU
0.5 U
0.5 U
O.SU
o.S U
2U
2U
0,5 U
O.S U
0.14 J
O.SU
o.su
0.5 U
o.s u
Trip BUnk

U-Jin-91
O.SUJ
0.5 U
O.SU
O.S U
O.SU
ruj
0.34 J
o.s u
0.5 U
0.5 U
O.SU
O.SU
2U
0.06 1
O.S U
O.SU
O.SU
0.5 U
O.SU
O.SU
O.SU
0.5 U
0.5 U
O.SU
2U
2U
O.SU
O.SU
0.13 J
0.5 U
O.SU
O.SU
O.OSJ
Trip Bin

2t-tin»;
O.S U
0.5 U
0.511
O.SU
O.SU
2111
0.) J
O.SU
0.5 U
O.S U
O.S U
O.S U
2 U
O.OSJ
O.SU
0.5 IJ
O.SU
0.5 U
O.S U
O.SU
O.S U
0.5 I)
0.5 U
O.SUJ
2 U
1 U
0.5 U
O.S It
O.S tJ
o.s u
0.5 tt
o.s u
O.SU
Agency methodology.
n Compound concentration wai determined at a secondary dilution factor,
f f-ilimaled mull.
11 Tde cnrnpmintl wai anilyiol for, hnl nnl delected at Ilie corresponding reporting
i( All lejHitlini; lirnili rijjcil ilnc In matrix inlerfereneci.
i All icjKifline liinili raised due lo higli level) o( other anilylcj.
l< Itciiitt rejected.
l:tt pielJ replicate of previotu sample.



limitj.




































-------
Table   9     Cftncenlrtlinni of Volatile Organic Compound] in Groundwaler Sample] Collected from Jinuiry lo March 1992, OU II Remedial Investigation, Vtga Alia. Puerto Rico.
                    Simple ID: Trip Btink   Trip Blink   Trip Blink   Tiip fllink    Trip Blink   Trip Blink    Trip Blank   Trip Blink    Trip Blank  .Trip Blank   Trip Blink   Trip Blank
                              A          II           A           n            A           B
                                                                                                                                                                                       Trip Blin)
                         Due:       JS-lm-92   39-Jan-9I    lQ-Jan-92    30-Jan-S2    3Mm-91    3Min-92      3-Fcb-92     4-Fcb-9I    S-Ftb-91     6-Feb-92    7-Ftb-92    IO-Ftb-91    tl-F.b-92
Clitnromeiliinc 0.5 U
ItrmiiDincltiajte 0.5 U
Vinyl tlilunJc 0.5 U
Cltlbiociliiine O.S U
Melliylene chloritlc ' O.SU
Aecldiic 2 UJ
.Cftilton dimlfide 0.38 J
I.I nichlurociljcne 0,511

I ,? hiciilurncllieiic (cti/lrnni) 0.5 U
rtilnri>r>»ril 0.5 U
1,2 DkMo'ocdinne O.SU
MliH.n.jne 2 U'
1,1 ,1-TticMoroctlnne O.SU
(.'•rlion tclracldoiiile O.SU
llromnilichloromcliianc O.S U
1,2-Dichlnrupriipanc O.SU
irant 1,3 Diclifotuptopcnc 0,5 U
Tni:Jd»rriJ
2U
O.SI
O.SU
0.5 U
O.SU
O.SU
O.SU
2U
o.oaj
O.SU
O.SU
O.S U
O.S U
O.SU
O.SU
O.S U
O.OB J
o.s u
O.S U
2 U
2U
O.SU
O.S U
O.ll J
O.SU
O.SU
O.SU
0.2 |l
O.SU
0.5 U
0.5 U
O.SU
0.21 J
211
0.1S J
O.SU
O.SU
O.SU
O.SU
O.SU
JU
on;
o.su
O.SU
OSU
O.SU
0.5 U
O.SU
O.SU
0.01 J
0.5 tl
0.5 U
2 U
2 U
O.SU
O.S U
0.07 J
0.5 U
0.5 U
OSU
O.SU
Agency methodology.





















     Atl tc|xii1iii|; liuijli railed title In irnlri* inlcrfcfcncc).
     All it|«>niii|; liinili i»iic
-------
Table   9    Conccnlrtlioni of Volatile Organic Compounds in Groundwnler Samples Collected from January lo March 1992, OU II Remedial Investigation, Vega Alii. Puerto Rico.
Simple ID: Trip Blink Trip Illtnk Trip Blink

Alulae Due: II-Feb-91 ll-Fcb-91 14-F«b-92
Cliliiriiinctlt.nc 0.5 11 0.5 U 0.5 U
Dfoinoinctliaiii 0.5 U 0.5 U 0.5 U
Vinyl elite. ride O.SU O.S'U O.SU
Clil'.roeti.'.ne 0.5 U O.S U O.J U
Mcihylciie dilnriflc 0.3 IJ O.SU 0.83 U
At-cKinc- 2 IJ 2 IJ 2 U
Carbon diiulfiilc 0.3] J 0.1 I J O.I 1 J
1 l-Dicliliiritcilicue O.S It 0.5 IJ O.SU
I'l -|Jicli|i.ii.til.i.>ie O.SU 0.5 U 0.511
l!2-Mici.lofue(l.erie(cii/iran(} O.SU O.SU O.SU
rhldfoform 0.5 IJ 0.5 U 0.5 U
1,2 tliciiloroctli.ne O.SU O.SU O.SU
2 llutenone 2 U 2 U 2 U
I.U-Trtchlnrncihane 0.21 J O.SU 0.4 J
Curl.oi, icfr.chloride 0.5 U 0.5 U O.S U
niamodichloromeihane 0.5 U 0.5 U 0.5 U
1.2 Dichloronroparte O.SU O.SU O.SU
Hunt 1.3 Diclilornprnpene 0.5 U O.J U 0.5 U
rriililufoctlicne O.SU 0..< U 0.06 J
Oiltruinocliloromclhane 0.5 U f,J> U 0.5 U
l.t.2 Tiictilnrcicilionc , 0.5 IJ 0.5(1 0.5 U
ltc,i«ne 0.09 J 0.08 J 0.2 J
tii-l,J-l)kliloropropeftc 0.5 U 0.5 U O.SU
lliiiini>r»rin O.S II 0.5 U O.S U
4 Mtihyl-2 pcnldiK.ne ' 2U 2U 2U
Mlci.iif.iic 211 211 21)
1.1,2,2-Tctr.elilornclhofic 0.511 0.511 O.SU
Uifi.ciiliirueii.tni: O.S 11 0.5 U 0.5 U
l..l»ci.c 0.08 J O.I4J O.ISJ
( •liliiriiliEfi icnc 0.5 U O.S U 0.5 U
Citiylticnicne 0.5 U 0.5 U 0,5 U
Siyrenc 0.5 U O.J IJ 0.5 U
XyUnci (mi*)} ' O.SU 0.17 J O.SU
Trip Dlink

1 g-Ftb-92
0.5 UJ
0.5 U
0.5 IJ
0.5 U
1.9
2 U
O.JJJ
0.5 U
O.S U
O.S U
0.05 J
O.S U '
2 U
0.13 t
0.5 U
O.SU
0.5 U
O.SU
0.5 U
O.JU
0.5 U
O.S U
O.SU
O.S U
2 IJ
2 U
0.5 U
0.5 U
0.5 U
O.J U
0.5 U
O.S U
0.5 U
Trip DUnk

IMtt*
0.5 UJ
0.5 U
0.5 U
0.5 U
0.25 J
2 U
0.48 J
0.5 U
0.5 U
O.J U
O.SU
0.5 U
2U
O.JU
0.5 U
O.SU
O.SU
0:5 u
0.5 U
O.SU
O.JU
0.5 U
O.J 11
0.5 U
2U
20
O.S 11
O.S U
0.07 J
O.SU
0.5 U
0.5 U
O.J U
Analyle concentrations in micragrami per liter (parts per billion fpph)).
Anutyses were performed by vartout inilylical iiibcomraclon using standard U.S. Environmental
Trip BUnk

20-Fcb-92
0.5 U
O.J U
O.J U
0.5 U
0.2 J
2U
0.11 J
0.5 U
n.s u
O.SU
O.SU
0.5 U
2 U
O.SU
05 U
0.5 U
O.J U
0.5 U
O.SU
O.SU
0.5 U
O.J U
O.JU
O.SU
2 U
211
0.5 U
0.5 U
0.05 J
0.5 U
O.JU
O.SU
O.SU
Trip Blink

3l-F«b.92
0.5 U
O.S U
O.S U
0.5 U
0,37 J
2U
O.S UJ
0.5 U
O.S U
0.5 U
O.J U
OSU
2U
0.18 J
0.5 U
O.JU
O.JU
O.JU
0.06 J
O.J U
O.J U
0.1 J
0.5 U
0.5 U
2U
2 U .
fl.S U
O.S U
0.11 J
o.s u
0.5 U
O.SU
O.J U
Trip DUnk

24-Feb-92
O.S U
O.S U
0.5 U
O.S U
0.3 J
1.6 J
O.JUJ
O.J U
0.5 U
0.5 U
O.SU
O.SU
2 U
0,21 J
O.J U
O.JU
O.JU
0.5U
O.OJ J
O.J U
O.JU
0.12J
O.S U
O.S U
2UJ
2 U
o.s u
o.s u
0.11 1
0.5 U
o.s u
0.5 U
0.5 U
Trip Btmk
B
lJ-Ftb-92
O.J UJ
O.JU
0.5 U
0.5 U
O.H;
2U
O.ISJ
O.JU
0.5 U
O.SU
O.SU
0,5 U.
1 U
O.JU
O.SU
O.SU
0.5 U
0.5 U
O.SU
O.SU
o.s u
0.5 U
• 0.5 U
o.s u
2U
2 U
0.5 IJ
O.S U
0.09 J
O.J U
O.S U
O.JU
0.5 U
Trip Blink

2*-F.b-92
0.5 U
0.5 U
0.5 U
O.SU
2.1 U
.4.7
O.JUJ
O.SU
0.5 U
O.JU
O.SU
O.SU .
2 U
O.JU
O.JU
O.SU
0.5 U
O.J U
O.J U
O.SU
O.JU
0.091
O.J U
o.su
2 U
2U
O.J U
O.J U
0.34 J
0.5 U
O.J U
O.JU
0.09 J
Trip Bt»nk

27-Fcb-92
0.5 U
0.5 U
0.5 U
0.5 U
1.7
4.2
0, 12 J
O.SU
O.SU
O.SU
O.S U
O.SU
2U
0.09 J
0.5 U
0.5 U
O.JU
O.J U
O.SU
O.SU
O.SU
0,1 J
0.5 U
0.5 U
3U
2U
0.5 U
O.JU
0.36J
O.JU
O.J U
O.SU
O.H J
Trip Bluk

JI-Ftb-92
O.SU
0.5 U
0.5 U
O.S U
O.UJ
2 U
0.161
O.SU
O.S U
O.J U
O.JU
0.4 U
2U
0.07 J
O.JU
o.s u
0.5 U
O.SU
O.JU
0.5 U
O.J If
O.JU
O.J U
O.J U
2U
JU
O.SU
o.s u
0.09 ;
0.5 U
O.JU
0.5 U
O.SU
Trip BU

2-Mir-'.
0.5 II
0.5 IJ
O.SU
O.JU
0.21 J
2 U
0.45 J
O.SU
0.5 II
O.S U
O.SU
O.J U
2 U
o u j
O.JU
0.5 U
O.JU
O.J U
O.S U
0.5 U
0.5 U
0.07 J
0.5 U
0.5 U
2 U
2 U
O.J IJ
O.J II
O.J J
O.J U
OSU
0.5 U
O.JU
Protection Agency methodology.
H Compound concentration wal determined at » secondary dilution factor.
J niiirnalcO remit.
11 The compound wai analyzed for, bul not delected al Hie corresponding reporting

-------
T.lilc  9  .    Concent ttliorti of VoUlile Organic Compound) in Groundwaler Sample* Collected from January lo March 1992, OU II Remedial fnvcaligition, Vegi Alt*. Puerto Rico.
                        Simple ID: Trip Blink  Trip Blink   Trip Blink  ' Trip Dtink   Trip Blink    Trip Blink    Trip Blink   Trip Blink    Trip Blink --Trip Blink   Trip Blink   Trip BUnk   Trip Btin
 Arulyie
                        Due:
3M.r92   4Mir-92   5-M»r-91    S-M.r-92
                                                                                   Mtr-92    JO-Mir-92    ll-M.r«    !2-M.r-92    13 M.r-92    16 Mir-91    l7-Mir-92    ll-Mir-Pl    I9-M.t~9.
Clilornmcllune O.S U 0.5 U
Iliiimninciliine 0.5 U O.S U
Vinyl chloride O.S U 0.5 U
ClilOfoeilitnc O.S U 0.5 U
Mcihylenc chlnriilc 0.2 1 0.5 U
Acelmic 211 2 U
C.rhun cliiulfide 0. IB J 0.2 J
l,l-()ichlorocitiene O.SU O.SU
l.t-hitjilmiicitiBnc 0.5 U O.S U
l.[7-[JiU>lt>iiclilornclliane O.S U O.S U
Mlui.nimc 2 U 2 U
l.l.l-rhchlotatlhine O.SU O.SU
Cnrlion icKichloride O.S U 0.5 U
Uromndichlofomeilmne O.S U O.S U
1.2-Dichlorapropwtc O.SU O.SU
itnni- 1,3-Oiclilorapropene O.SU O.SU
Tfichloroethene O.S U 0.5 U
hlbiamochluromcihene O.S U O.S U
1.1.2-Tricr.toracitiine O.SU O.SU
Ilcntcne O.S U 0,5 U
cti-l.l-Dichlnraprapene O.SU O.SU
fir omo farm O.S U O.S U
•I.MclliyJ-2-pcnlannnc . 211 2U
Mfeiuianc 2U 2U
I.l,2,2-Tcti*clilornelli»ne O.SU O.SU
TctrtchlOfOdhcnc O.S U O.S U
li.lucnc O.IJ O.I2J
Clilarubenicnc 0.5 U O.S U
Rliyllicnicne O.S U ' O.S U
Siyicne O.SU O.SU
Xylencl (im.1) O.S U O.S U
O.SU
O.S U
O.S U
O.S U
O.SU
2 U
0.36 J
O.SU
O.SU
O.S U
O.OS J
0.5 U
2 U
O.SU
O.SU
I J
O.S U
O.SU
O.SU
O.S U
O.SU
O.S U
O.SU
O.SU
2U
2U
O.S U
O.SU
O.lfiJ
O.S U
o.su
O.SU
O.SU
Analytc concentration* in microgrami per liter (parti per billion [ppbl
Anilyief were performed by vanoui analytical subcontractor* using it
O.S U
0.5 U
O.SU
O.S U
O.S U
2 U
0.76 J
0.5 U
O.S U
O.S U
O.SU
O.SU
2 U
O.S U
O.S U
0.5 U
O.SU
O.SU
0.11 J
0.5 U
0.5 U
0.5 U
0.5 U
O.S UJ
2U
R
O.S U
O.S U
0.08 J
O.SU
O.SU
O.SU
O.SU
indard U.S.
O.SU
O.SU
O.S U
O.SU
0.35 J
2 U
0.08 J
O.SU
O.S U
O.SU
0.5 U
0.5 U
2U
O.S U
O.SU
o.su
O.SU
O.SU
O.SU
o.su
.0.5 U
O.SU
o.s u
O.SU
2U
2U
O.SU
O.SU
0.09 J
O.SU
O.S U
O.SU
O.S U
Environmental
O.SUJ
0.5 U
0.5 U
O.SU
O.SU
211
O.SUJ
O.SU
0.5 U
0.5 U
O.SU
O.SU
2U
0.05 J
O.SU
0.5 U
O.S U
O.SU
O.SU
O.SU
O.SU
0.5 U
0.5 U
O.SU
2U
2U
O.SU
0.5 U
0.5 U
O.SU
O.SU
O.SU
O.SU
O.SU
O.S U
O.SU
05 U
O.SU
2UJ
O.SUJ
O.SU
O.SU
O.SU
O.SU
O.SU
2U
O.S U
O.S U
O.S U
O.S U
O.SU
O.SU
O.SU
O.SU
O.S U
O.SU
O.SUJ
2U
2U
O.SU
O.SU
fl.SU
. O.S U
O.SU
O.SU
O.SU
O.SUJ
O.SU
O.SU
O.SU
O.SU
2U
O.SUJ
O.SU
O.SU
o.su
O.SU
O.SU
2U
O.SU
O.SU
O.SU
O.S U
O.SU
O.SU
O.SU
O.SU
O.SU
O.SU
O.S U
2U
2U
O.SU
O.SU
O.SU
O.SU
O.S U
O.SU
o.su
O.SU
0.5 U
O.S U
o.s u
O.SU
2UJ
0.16J
O.SU
O.SU
O.SU
O.SU
O.SU
2U
0.08 J
O.S U
O.SU
O.SU
O.SU
O.SU
O.SU
o.su
O.S U
O.S U
O.S U
2 U
2U
O.S U
O.SU
0.11 J
O.S U
O.SU
0.5 U
O.S U
0.5 U
O.S U
O.SU
O.S U
O.S U '
2U
0.17J
O.S U
O.SU
O.SU
O.SU
O.S U
2U
O.IJ
O.SU
O.SU
O.S U
O.SU
O.SU
O.SU
O.SU
0.07 J
O.S U
O.SUJ
2U
2U
O.SU
o.s u
0.09 J
O.SU
O.S U
O.SU
O.SU
O.S U
o.s u
O.S U
0.5 U
O.S U
!.§U
O.ISJ
O.S U
O.S U
O.SU
O.SU
O.S U
1 U
0.)4 J
0.5 U
O.SU
O.S U
0.5 U
O.SU
O.SU
O.SU
O.O9J
O.S U
O.SU
2U
2 U
O.SU
O.S U
0.07 J
0.5 U
O.SU
O.S U
O.SU
O.SU
O.S U
.O.SU
O.SU
0.37 J
2U
0.22 J
O.SU
O.SU
O.SU
O.SU
O.SU
2U
0.46 J
O.S U
osu
O.SU
O.SU
0.09 J
O.SU
O.SU
0.27 J
O.S U
O.S U
2U
2U
O.SU
O.SU
O.lt J
O.SU
O.SU
O.SU
O.SU
O.SU
0.5 II
0.5 11
O.S U
0.2S J
211
O.29J
O.S tl
O.SU
0.511
0.5 U
O.S U
2U
O.SU
O.SU
0.5 U
0.5 U
O.SU
O.SU
O.SU
0.5 II
O.S U
0.5 U
O.SU
2U
2 U
O.S U
O.S U
0,05 J
O.SU
O.S U
O.SU
O.SU
Protect ion Agency methodology ,
l> Conipntinit concentration wai determined al a iccomJary dilution factor.
1 • nuimaled rctutt.
1 1 Ttic compound wu analyzed for, bill not delected at

the conxj[

•ending rejxi

rting limit).
















     All re|n>iling liinili niieil due In matrix interferencei.
     All tciHiilinn iiiniu uiicil duo Hi liicli leveli of oilier analytci.
     l(«utf mected.
     l:idd rc|>l)catc of previaut

-------
  •Table   9     Concentration* of Volatile Organic Compound!.in Groimdwaler Samples Collected from January to March 1992, OU II Remediil Inveatigalion. Vega AJla, Puerto Rico.



                           Simple ID: Trip Blink   Trip Blink



   Anil) le                  Dale:
 Cliloromcllunc                       0.5 U       0.5 U
 Hmrnoinclliotit                       05 U       O.S U
 Vinyl cltloiiUe                        O.S II       0.5 U
 Chlorouhani                         0.5 U       0.5 U
 Mtlhylene chloride                   0.35 J       0.5 U

 Accionc                              2 U '         2 U
 Corhan JiiulfiJe                     0.33 J        1.4
  1,1-Dicbloroelhcnc                   0.5 U       0.5 U
  l.l-nk-liliitiiclli.iie                   0.511       0.5 U
  l,2.Oiclil<>ructlicitc(eU/inn>)         0.5 U       0.5 U

 Chloroform                          O.S U       O.S U
  I .MJithliifnclti.nc                   O.SU       0.5 U
 2-Dulin»ne                           2 U         2 U
 I.I.I -Trichlof ocihinc                 0.13 J       0.05 J
 Carbon lelnchloride                  0.5 U       O.S V

 i)romodiclilorcmuh»ne                O.S U        0.5 U
 1,7 Uichloronrop«nc                  0.5 U        0.5 U
 Kont.|,3-Dii:liloropriJpcni:             0,5 U        O.SU
 Tfichlurocthcnc                       O.OB J       O.S U
                                      0.5 U        0.5 U
 I,i.2-Tricli1oiocthine                O.SU        O.SU
 flciKcnc                            O.I I i       O.S U
 cii.l.J-Oicliloro(iiapcnc              0.5 U        O.SU
 Itmnioform            '              0.5 U        0.5 U
 4.Mclliyl-2-pcnlnnniic                 2 II         21)

 2  llcunnnc                           2U         2U
 l,l.2.2-TElrmclil»incllwnc             O.SU        O.SU
 lucKhluiucilieiw                    0.5 II        O.S U
 lulucnc                             O.I 7.1        O.I5J
             e                       0,S U        O.S U
 frliylttenzcne                        O.5 t)       0.5 U
 Sir/cnc                              O.S U       O.S U
 Xyttncs ((atil)                       05 U       O.S U
Analylc concentration* in microgremi per liter (parti per billion [ppt>]).                •
Analyici were performed by vanniu analylicil inbconi radon ujmg standard U.S. Environmental Protection Agency methodology.

0     Compound concentration u/*i determined at i secondary dilution factor.
i       Rstimaled result.
II     The cnmrxninil w») analyTci) for, hut not delected at the corrciponding rcponmg limiti.
'I      All ic|Hnl|O|: lirnili ruiiol line to inalrix interference].
j       All (eiHiiiinv limit! raiieil due In digit ki/tli of other »ntlyicj.
1(      Uciull reiccled.
IK    t:ic|il icplicalc of previous lample.

-------
Tible  10  Summary of Volatile Orpnic Compouod* Sutittical lafarnutioorarihc January to Mircfa 1992 GreuadwiterStapliiifEveat,
          OU II Remedial Investiplkm, Vep AJl*. Puerto Rico.
Compound Nune
1,1,1 -Triehkroethiae
1^2 -TrieWoroeUune
U-Dkhtorocthue
1.1-Dchlcroeiiene
1,2 -Dfchlcrcclhane
1,2 -Dicnlcroetheae (cii/tru*)
1 2 -Dichlcroproptne
2-Butaaooe
2-HciMone
4-Mdbyl-2-penianone
Acetone
Benzene
Bnmodichlaronetbaac
Cirboa diialfide
Carbon ictnchloridc
CUoro benzene
Chloroform
Chlorometnattc
DtbronocaJoromeiajne
Elbylbenzene
Methylene chloride
Siyreoc
Teinchloroetbeiic
Toluene
TrichJoroetheae
Vinyl cbloride
Xyteaa(taul)
Toul
Number of
Dclccu
-------
k-  11    Volatile Organic Compounds Concentration! in GcomitJwalcr Saimilcl Co I Ice ltd fruin Monitoring Wclli al l)ic PHIDCO InJinlrinl Park in Auyiisl and September 1973, OU If
          Remedial Investigation, Vega Aha. Puerto Jlico.
Simple ID: BVAW-22.0IDVAW-22-02DVAW-2I OJ BVAW-22-04
                                                                                         BVAW-22-06 BVAW-22-07 JjVA\V-22-0» BVAW-12-09 CM 01
                                                                                                                                                      CM 01 FR   GM 01
                                                                                                                                                                              GMW.OI-(ll
                     DIK:
           l-Sep-93    l-Sep-93    l-Stp-93     l-Sff-9)     l-S«p-9J
                                                                                                       l-Ktp-93     \.5tp-93     l-Stp-93     3-Scp-93     3-Scp-9J     3 Stp-9J     2 Sip VJ
>rumc(h«ie
noincihine
•1 chloride
< methane
'lylciie cMoriJe
»iie
•*»n Jitulficrc
Dichliiroelhene
'.hchloioellisne
Jlcliluiuellicne (cis/lrani)
rufnrrn
Jiclilacoelhinc
inncinc
l-Trichlofoellmne
mi Iclnchloride
irHliclilorofiielhane
Oichluropropane
.3-Oiebtdiopropene
ilofocihene
rmucliloromclli(ute
-Trkhloroethuie
-rtc
1 ,3- Dichlotapiopcnc
tifiirni
iliyl-2-penUnone

-------
                                 dollwlcd f™'" M<"»«"»'6
                                                                                                           "«
lIHlu.lri.l P.,k in AuE..,i .,,,1
                                                                                                                                                              1993. OU II
                                                                                                                                                                             Pige 2 of 4
                   Simple ID: OMW-01.02 GMW41.Q1 GMW-01.04  CMW-OI-OJ  CMW-01-OS  GMW-OLO?  OMW-OI-OI  GMW4I-OB  CMW-OI-09  GMW-OI-IO GMW-OMI  GMW-OI-Ot
                   Dale:
2-Scp-93    I-Scp-93     2-Scp-93     3-S«p-93     3-S-93
                                                                                                                                                                            3|.Aog9J
ii'mctliine
Kimetlianc
1 ctda'ide
ruclliine
*ylcnc chloride
me
»n ditulHde
tichloroeihcnc
>ichloroethine
1 ivliloroelhene (cii/trans)
ufiirm
ic til or a ethane
ii none
• If ichloroclhuie
in IcUachloride
iidichlororncthine
kliloropropane
•) Uicliloropropcnc
itroctlieiiG
tnucliloromelhane
Tt ichloroethuie
ne
1.3- Dichloropropene
'fmm
iyl-2-pentanone
umne
? Telnchlorocthane
hloroclhcne
*C
Atcnttne
cmenc
c
n (total)
0.5 UJ
0.5 U
0.5 UJ
O.SU
I.I U
2UJ
O.SUJ
O.I7J
O.SU
0.52
O.S U
0.5 U
2 UJ
O.S U
0.5 UJ
0.5 UJ
0.5 U
O.SUJ
14
0.5 UJ
O.J U
2.2
O.SU
0.5 UJ
2UJ
2UJ
O.SUJ
0.088 J
0.5 U
0.5 U
0.5 U
O.S U
O.i U
O.SUJ
O.J U
O.SUJ
0.5 U
3.2 U
2UJ
O.SU
O.SU
O.iU
1.1
O.S U
0.53
2UJ
0.5 U
O.SUJ
0.5 UJ
0.5 U
o.iUJ
19
O.SUJ
0.5 U
0.51
0.5 U
O.SUJ
2UJ
2 UJ
O.SUJ
0.2 J
O.SU
O.SU
0.5 U
0 08J 1
O.SU
O.SUJ
O.SU
O.SUJ
O.S U
3.3 U
*2UJ
0.5 U
0.53
O.SU
1.1
O.SU
O.SU
2UJ ,
0.1 U
O.SUJ
O.SUJ
O.S U
O.S UJ
49 D
O.SUJ
0.5 U
0.095 J
O.SU
O.JUJ
2 UJ
2UJ
O.SUJ
0.94
O.J U
O.SU
O.i U
0.5 U
O.SU
O.SUJ
0.5 U
0.22 J
O.i U
3.6 UJ
2UJ
O.SJ
1.6 •
O.JU
10
O.SU
O.SU
2UJ
0.5 U
O.iUJ
O.SUJ
o.su
O.SUJ
130 O
O.iUJ
O.SU
O.iU
O.SU
O.SUJ
2UJ
2UJ
O.SUJ
0.58
O.S U
O.SU
O.i U
o.ju
O.SU
25 UJ
25 U
25 UJ
25 UJ
25 U
100 UJ
25 UJ
15 J
25 U
26
25 U
25 U
100 UJ
25 U
25 UJ
25 UJ
2S U
2JUJ
1000
25 UJ
25 U
25 U
25 UJ
2SUJ
100 UJ
100 UJ
25 UJ
12 J
25 U
25 U
25 U
25 U
.25 U
• O.SUJ
o.S u
O.SUJ
O.S UJ
O.SU
2 UJ
O.S UJ
O.SU
O.SU
o.su
O.SU
O.SU
2UJ
O.SU
O.S UJ
O.JUJ
O.S U
O.SUJ
3.8
O.SUJ
O.SU
O.SU
O.S UJ
O.S UJ
2UJ
2UJ
O.SUJ
O.SU
O.S U
O.SU
0.5 U
O.S U
o.iU
O.SU
O.iU
O.S UJ
0.5 U
0.93 UJ
2U
O.SUJ
O.SU
O.SUJ
0.5 U
O.iU
O.SU
2 U
O.SU
O.SU
O.SUJ
O.i U
O.JUJ
4.1
O.SUJ
O.SU
0.17J
0.5 U
O.SUJ
2U
2U
O.SU
O.iU
O.SU
O.S U
0.5 U
O.SU
O.SU
O.SU
O.SU
O.SUJ
O.S U
2.2 UJ
2U -
0.5 UJ
O.SU
O.SUJ
O.SU
O.SU
O.SU
zu
O.SU
O.SU
O.SUJ
O.SU
O.SUJ
4.2
o.suJ
O.SU
0.36 J
O.SU
O.SUJ
2U
2U
0.5 U
O.SU
O.SU
O.SU
0.5 U
O.SU
O.SU
O.SU
0.5 U
O.SUJ
0.5 U -
I.I UJ
2U
O.SUJ
O.SU
O.SUJ
0.24 J
O.SU
O.SU
2U
0.5 U
O.SU
O.JUJ
O.SU
O.SUJ
3.6
O.SUJ
O.JU
0,065 J
O.SU
O.SUJ
2U
2U
O.SU
O.SU
O.S U
O.i U
O.SU
0.092 1
O.SU
O.i U '
O.SU
O.SUJ
O.J U
0.88 UJ
2U
2.4UJ
O.SU
O.SUJ
O.S U
O.SU
O.SU
2 U
0.5 U
0.5 U
O.SUJ
0.5 U
o.iUJ
2.9
O.iUJ
O.SU
O.SU
O.iU
O.S UJ
2 U
2 U
O.S U
O.SU
0,5 U
O.S U
O.iU '
0.3 J
O.S U
o.s ii
O.J II
0.5 U
O.SU
I.I U
2U
0.2SJ
0.5 U
O.SU
O.SU
O.I J
0.5 U
2U
O.SU
0.3 U
O.SU
84 D
O.SU
1.2
0.5 U
0.3 U
O.HJ
O.SU
0.5 U
2 U
2U
O.SU
O.I5J
0.5 U
0.064 J
0.5 U
0.26J
0.5 U
0.50 UJ
O.SO U
O.SO UJ
O.SO UJ
66D
I8J
O.SO UJ
O.SOU
O.SOU
0.50 UJ
o.sou
o.sou
2.0 UJ
o.sou
O.SO U
0.50 UJ
o.sou
O.SO UJ
1.7
0.30 UJ
O.SOU
I.2J
O.SOU
0.50 UJ
2.0 U
2.0 UJ
0.50 UJ
O.SOU
O.SO UJ
O.SO UJ
o.so ur
0.50UJ
O.SO UJ
0.50 UJ
0,30 U
0.50 UJ
O.SO UJ '
5.3
2.0 UJ
O.SO U
0.5011
O.JOU
O.SO U
0.30 U
O.SOU
2.0 u;
o.sou
o.sou
0.50 UJ
0 30 U
0.50 UJ
0.62
0.30 UJ
o.sou
0.53 J
o.iou
0.50 UJ
2.0 U .
2.0 UJ
0.3011
- 0.50 U
0.50 UJ
O.SO UJ
o.sou
on j
o.io UJ
c ronccnlralioni in micro^nimi per liter (p»rtf per billion Fp|>b}).
c« were performed by v*noui analytical jubeonlrnetori, mine «l«nddrd U.S. Environmcnlal Protection Agency (USCPA) methodology.

Tlic compound w»j iho delected in the itsocialed method blank.
Compound concentration wii determined it • secondary dilution factor.
Intimated letnlt.
Tlic cnniiwiunil was analyzed fur, hut not detected at the corresponding reporting liinili.
All rcpnmne limits raned due to matrix interfcreneei.
Nut applicable.

-------
 i:  11    Volatile Organic Compounds Concentration; in Groundwalcr Snmplcs CollcclcJ from Monitoring Wells al the PK1DCO Industrial Park 141 Aucuil »inJ Sciitcinbcr 1993. OU II
           Remedial Invejtigalion, Vega Alia, Puerto Rico.
                                                                                                                                                                                    uf-1
                     Sample ID: GMW-02-OJ GMW-02-04 CMW-02-05  GMW-02-06  OMW-02-07 GMW-01-08  GMW-02-09  CMW-OJ-OI  CMW-03-02  CMW-OJ-03  GMW-O3-O4  GMW-OJ 05  GMWOJOfi
 • lyte
                     Due:
3l-Auf-9J   31-Auj «  ]|-Auf-«3   3l-Au|-9J     l-3tp 93    l-Scp-?J      l-S«p-93    30-Au|-93   30-Au(-93    30-Au(-93
30-Aut-9J   30-Aut-93
mitielhuic
Momclhune
1 chloride
•Kictliuie
iylcnc chloride
iclilr>roclhcne
>khlnfoethane
Jichloroethcne (tii/truii)
inform
>ich1urocthMe
inrtonc
.Ttichloroelhane
mi lelrichlortde
todicMorornetrtvic
Jictilotop rapine
. 3 -Die lilor opropcne
ilnroetlierte
Miiochluromcltiuie
-TrichloroelfjMiG
eric
•1,3-Oichloropropcnn
oform
ifiyl-2-penUitone
(rtinine
,J-Tclnchloroelh»ne
chtoroctHenc
:MC
lobcnicne
licnicnc
llfi
MCI (tola!)-
6.9 VI
S.OU
S.OUJ
S.OUJ
140
20 UJ
S.OU
3.8J
S.OU
I.2J
S.OU
S.OU
10 UJ
5.0 U
5.0 U
S.OU
S.OU
S.OU/
170
S.OUJ
S.OU
S.OUJ
3.0 U
S.OUJ
20 U
70 UJ
5.0 U
6,4
S.OUJ
i.OUJ
S.OUJ
S.OUJ
S.OUJ
S.OUJ
S.OU
S.OU
S.O UJ
12
30 UJ
S.OUJ
14
2.3 J
3.4J
S.O U
S.O UJ
20 UJ
S.OU
S.OU
S.OU
S.OU
5.0 UJ
430 D
S.OUJ
S.OU
S.OUJ
S.OU
5.0 UJ
20 UJ
20 U
S.OU
26
S.OUJ
S.OUJ
S.OUJ
S.O UJ
S.OUJ
5.0 UJ
S.OU
S.OU
S.OUJ
24 J
20 UJ
J.OUJ
S.OU
S.OU
12
S.OU
S.OUJ
20 UJ
S.OU
S.OU
S.OU
S.OU
j.o u;
750 D
S.OU
S.OU
S.OUJ
5.0 UJ
S.OUJ
20 UJ
20 U
S.OU
3.8 J
S.O UJ
S.OUJ
S.OUJ
S.OUJ
S.OU
12 UJ
12 U
12 U
12 UJ
95 J
50 UJ
12 UJ
14
12 U
9.1 J
12 U
12 UJ
50 UJ
I2U
12 U
12 U
12 U
12 UJ
920
12 U
12 U
3.7UJ
12 UJ
12 UJ
50 UJ
SOU
12 U
16
12 UJ
12 UJ
12 UJ
12 UJ
\1 U
25 U
25 U
25 U
25 UJ
ecu
100 UJ
25 UJ
220
2B
29
25 U
25 UJ
100 UJ
25 U
25 U
25 U
25 U
25 UJ
3900 D
25 UJ
25 U
25 U
25 UJ
25 UJ
100 U
100 UJ
25 U
240
25 U
25 U
25 U
25 U
25 U
25 U
25 U
25 U
25 UJ
99U
100 UJ
2J UJ
140
20 J
12J
. 25 U
25 UJ
100 UJ
25 U
25 U
25 U
25 U
25 UJ
2000 D
25 UJ
25 U
25 U
25 UJ
25 UJ
100 U
100 UJ
25 U
120
25 U
25 U
25 U
25 U
25U
25 U
25 U
25 U
25 UJ
57 U
100 UJ
25 UJ
230
03
76
25 U
25 UJ
100 UJ .
25 U
25 U
25 U
25 U
25 UJ
2700 D
25 UJ
25 U
21 U
2SUJ
25 UJ
100 U
100 UJ
25 U
86
25 U
25 U
15 U
4.5 J
25 U
0.5 U
0.5 UJ
0.5 UJ
0.5 U
0.5 UJ
31
10 UJ
4.C UJ
O.SU
0.5 U
O.S U
0.511
O.SU
0.5 U
O.SU
0.5 UJ
O.SU
O.SU
0.43 I
0.5 UJ
0.51
0.5 UJ
0.5 UJ
0. U
0. U
0. U
0. U
0. U
O.SU
O.SU
O.SU
O.SU
O.SU
0.5 UJ
0.5IJ
O.SU
0.5 UJ
87 D
20 UJ
O.SUJ
0.5 U
O.SU
O.SU
o.su
0.5 U
O.S UJ
o.su
O.SU
O.S UJ
0.5 U
o.su
0.2 UJ
O.SUJ
0.5 U
2.1
O.SUJ
o.su
o.su
2 UJ
0.5 U
O.SU
O.SU
O.SU
o.su
0.073
O.SU
2UJ
O.SU
O.SU
2UJ
88
24 UJ
2 UJ
0,5 U
0.5 U
0.5 U
0.5 U
0.5 U
8 UJ
0,5 U
0.5 U
2UJ
O.S U
0,5 U
O.SU
2UJ
0.5 U '
7
2UJ
2UJ
O.SU
S UJ
O.S U
O.SU
0.2 UJ
O.S U
O.SU
o.su
0.5 U
0.5 U
O.S UJ
o.su
0.5 UJ
0.5 UJ
260(1
130 UJ
0.5 UJ
0.31 J
0.5 U
0.5 U
1.3
0.5 U
2 UJ
0.5U
0.5 U
O.S U
O.SU
O.SU
2.1
O.SUJ
O.SU
3.6
O.SU
O.SUJ
0.5U
O.SU
0.5 U
0.3 J .
0.06 J
0.3 U
0.5 U
0.5 U
1.2 UJ
0.5 U
O.SU
1.2 u;
70 U
27 UJ
1.2 (IJ
. 0.5 U
O.SU
0.5 U
GU
0.5 U
5UJ
0.5 U
O.SU
I.2UJ
0.5 U
0.5 U
I.9U
1.2 UJ
O.SU
0.67 J
1.2 UJ
I.21U
0.5 U
5 UJ
O.SU
0.26J
0.5 U
0.5 U
O.SU
0.5 U
O.S U
OSUJ
O.SU
0.5 U
0.5 UJ
39 U
16 UJ
O.S UJ
0.5 II
0.5 U
0.5 U
4.8 (1
O.SU
2UJ
0.5 U
O.SU
0.5 UJ
05 U
0.5 U
2 U
NA
O.SU
LI U
0.5 UJ
0.5 UJ
O.S U
2UJ
O.S U
0.47 J
0.5 U
0.5 U
0.5 U
0.5 U
O.S U
vie concern ra I ioni in micrnerami per liter (pnrt« per billion ||>pb|).               .         ._     ,            .. __      ,  ',  ,
ysct were performed by various inalylicol lubconlraaon. using standard U.S. Environmental Protection Agency (USEPA) methodology.

  Tlie compound wai aiio delected in Hie usiociated iticlltod blink.
  Compound concentration w«j determined ii a secondary dilution factor.
  Intimated ictult.                                                              ,
  Tltc compound was innlyrtil For, tint not clclcclcd «t the corresponding rc|torl!(ig limits.
  All fxpomne limits railed due to matrix interferences.
  Nnl »|>plk»Glc.

-------
Me 11    Volatile Organic Compound? Concentrations in GroumJwnler Samples Collected from Monitoring Welli al Hie PRJDCO Industrial Park iii.Aucuil and Sepleinber 1993. OU II
           Remedial Investigation, Veg» Alia, Puerto Rico.

Simple

nilytc Dite:
liiromelhane
unomclhine
i)'l chloride
otocihtne
ihylene chloride
•long
lion disulfiJe
DichloroeJheno
[Jichloroelhane
IJiclilotoelhene (cts/lrans)
irofarm
Dichloroelhane
iinnone
1-Tricliloioclhane
ion iclrichloudc
mndicliloramelhcnc
Dichloiopropane
1 .3-Dichloropronene
* Moroeihcne
omucfiliMomelhane
{•Tricolor oethane
ene
1,3-DkKloropropenc
inform
•iliyl-2-penUnone
UIIOIIC
, 2-Tcir»c hloroct hane
•diloiocllicne
cue
rubenzene
Ebcnicne
'1C
net (total)
ID: Field FielJ
Blink Blink
l-Sep-9] 2-Stp-91
0.50 UJ O.S U
0.50 UJ 0.5 U
0.50 UJ 0.5 U
0.50 UJ 0.5 U .
4.5 B 0.5 U
2.0 U 2 UJ
"I.IJ I.JJ
0.50 U 0.5 U
0.50 U O.S U
0.50 U O.S UJ
0.50 U 0.5 U
0.50 U 0.5 U
2.0 U 2 U
0.50 U O.S U
0.50 U O.S U
0.50 UJ 0.3 UJ
0.50 U O.S U
0.50 UJ O.S UJ
0.50 U 0.5 U
0.50 UJ 0.5 UJ
0.50 U O.S U
0.50 U O.S U
0.50 UJ O.SU
0.50 UJ 0.5 UJ
2.0 U 2 U
2.0 U 2 U
•0.50 UJ O.S U
0.50 U 0.5 U
0.50 U 0.088 J
0.50 U 0.5 U
0 SO U 0.5 U
0.50 U' 0.5 U
0,50 U O.S U
Field
Blink M
JStp-93
O.SUJ
O.SU
0,5 UJ
O.SUJ
0.22 J
2U
II
O.SU
O.SU
0.5 U
O.SU
O.SU
ZUJ
O.SU
0.5 U
O.SUJ
O.SU
0.5 UJ
O.SU
O.SUJ
O.SU
O.SU
O.SU
O.SUJ
ZUJ
2U
O.SU
O.SU
0.07 J
O.SU
O.S U
O.S U
O.SU
Field
Dl.ntS.W.
J-Sep-9J
O.SUJ
.0.5 U
O.SUJ
0.5 UJ
O.S U
2U
0.9I
O.SU
O.SU
O.SU
O.S U
O.SU
2UJ
O.SU
0.5 U
O.SUJ
O.SU
O.SUJ
O.SU
o.SUJ
O.SU
O.SU
O.SU
O.SUJ
ZUJ
2U
O.SU
O.SU
0.061 J
O.SU
O.SU
0.5 U
O.SU
Field
Olink
7.S
-------
Table   12   , Summary of Volatile Organic Compounds Statistical Information for the August through September 1993
               Groundwatcr Sampling. OU II Remedial Investigation, Vega Alti, Puerto Rico.
Total Number of
Number Discrete
Component Name
1,1,1-Trichlorocthane
1,1,2-Trichloroethane
1,1-DichIoroethane
1,1-Dtchloroeihene
1 ,2 -Dichloroe i ha ne
1 .2- Dichloroe thcne (cij/traru)
1 ,2 - Dichlo ropropanc
2-Butanone
2-Hexanone
4-Mcthyl-2-pcmanone
Acetone
Benzene
Bromod ich lorornc thane
Carbondtsulfide
Carbon letrachloride
Chlorobcnzene
Chloroform
Chloromeihane
D ibro moch lorome t ha nc
Ethylbcnzcne
Mcthylcne chloride
Styrcnc
Tcirachloroeihene
Toluene
Trichlorocihcne
Vinyl chloride
Xylcncs (total)
of Detects Dciecu
0
1
13
19
2
22
1
0
0
0
4
18
0
8
0
2
1
2
1
3
13
11
24
8
34
1
0
0
1
12
18
2
21
0
0
0
0
4
16
0
7
0
1
0
2
1
3
12
10
22
8
31
1
0
Number of Number of
Discreie Maximum Detects Observation}
Detection Concentration Qualified Qualified
Frequency (%) (o
0.00
2J2
26.67
40.00
4.44
46.67
0.00
0.00
0.00
0.00
8.89
35.56
0.00
15.56
0.00
2.22
0.00
4.44
2.22
6.67
26.67
22.22
48.89
17.78
68.89
2.22
0.00
iH>
2
O.S1
63
290
U
76
84
100
too
100
280 .
7
100
11
25
0.06
0.1
3,1
2.1
at
140

-------
Table 13  Soil-Gas Survey ATMS and Number of Points Sampled and Analyzed from February through
          April 1992, OL/ II Remedial Investigation, Vega Alta, Puerto Rico.
AREA                                                    SAMPLES ANALYZED
 Concrete Pad                                                        76
 Honda Creek                                                        61
 Caribe GE Parking Lot                                               61
 Caribe GE Pilot Bldg. No. 1                                           25
 Caribe GE Pilot Bldg. No. 2                                           21
 Rovipak (formerly Motorola)                                          19
 Drainage Ditch                                                     17
 Former Drainage Ditch                                               27
 Formerly West Co.                                                  48
 West Co; No.  1                                                     61
 West Co. No.  2                                                     59
 Elba Ceramics                                                       12
 Harmon Auto                                                       , 69
 Caribe GE Control Plant                                          -90
 Teledyne Packaging                                                  46
 •Sam Food                                                          4
 Landfill   '         .                                                38
  TOTAL                                                           734
 l-i."- XI,'SOLCASOC.XLS

-------
  COMMONWEALTH OF PUERTO RICO
     LETTER OF CONCURRENCE

VEGA ALTA PUBLIC SUPPLY WELLS SITE
     VEGA ALTA, PUERTO RICO

           APPENDIX C

-------
              39:5;  FR
                        ENVIRONMENTAL QUALITY BOARD
                 EMERGENCY RESPONSE AND SUPERFUND AREA
CORE&RPMDtoaiora     .                 .                     •
 Superfand Program       .


September 24.1997     .                •


Eng. Adalberto Bosque                                   .
Project Manager                                             .
Vega Alta Public Supply Wefls S8»
US Environmental Protection Agency
Caribbean Environmental Protection Divisioii
Centre Europa Building, Suite 417..          •'"'.-
San Juan, Puerto Rico  00907-4127                              ,



PJL ENVIRONMENTAL QUALITY BOARQ
CONCURRENCE LETTER FOR THE RECORD OF DECISION
VEGA ALTA PUBLIC SUPPLY WELLS SITS
OPERABLE UNIT TWO
VEGA ALTA, PUERTO RICO-


Dear engineer Bosque:                       '                          .


The Puerto Rico Environmental Quality Board (PREQBJ has been consulted about 9ie selection by the U.S.
Environmental protection Agency (USEPA) of a source control remedy for he Vega Alta Public Supply Wefts
Site regarding the Second Operable Unit.  This decision has been made in accordance with the requiremertb
of the Comprehensive EnvironmentaJ Response, Compensation and UaMHy Act of 1980 (CERCLA). as
amended by the Superfund Amendments and Reaufronzation Act of 198&

After reviewing the Record of Decision (ROD) documents provided by USEPA the PREQB concurs with this
ROD for the Second Operable Unit of me Vega Alta Public Supply Wefls Sita

We also request that USEPA keep us informed of aD future activities performed on this site, tf you have any
cuesbons regarding this matter please contact Mr. Jimmy A. Drowne. Remedial Project Manager. Emergency
Response and Superfund Area, at phone numbers (787) 767-8181, extension 2234 and 766-2821
                                           FAX  TRANSM1TTAL
/(d                                      -,.iil_iL2L___	
c:      Genaro Torres Leon, PREQB          ^xs"«*-8--"7-™"	*»*^'
       Miguel A Maldonado Negron. PREQB	~~        ~      ~
                     Gre«n forests and oystalCna waters, dnn air and dear shits.
                            You prefect irfe if you do not contamtrutar
                NaUonat Bank Plan / 401 Ponct da Lewi Av«. / Hata R«y. Puerto Rico 00917
               P.O. Box 11488 / Santtirce. P«nrto Rico 00910 / (BQ9) 767-8181. Ext. ??y>or 3230
                                                                                  P.01

-------
    RESPONSIVENESS SUMMARY
VEGA ALTA PUBLIC SUPPLY WELLS SITE
     VEGA ALTA, PUERTO RICO

           APPENDIX D

-------
                     RESPONSIVENESS SUMMARY
                              FOR THE
                          REMEDIAL ACTION
                               AT THE
          VEGA ALTA PUBLIC SUPPLY WELLS SITE, PUERTO RICO
                            Operable Unit II
                         TABLE OF CONTENTS


SECTION                                                  PAGE

Introduction 	  1


I. Background on Community Involvement and Concerns  	 2
  Comprehensive Summary of Major Questions, Comments, Concerns,
  and Responses   	-	2
  A. Summary of Oral Questions and Responses from the Public Meeting
    Concerning the Vega Alta Site	4
  B. Summary of Written Questions and Responses Received
    During the Public Comment Period  	."	12
ATTACHMENT

  Community Relations Activities at the Vega Alta Site

-------
                        RESPONSIVENESS SUMMARY
                      Vega Alta Public Supply Wells Site
                           Vega Alta, Puerto Rico
INTRODUCTION
This Responsiveness Summary documents the public's comments and concerns and
the U.S. Environmental Protection Agency's (EPA's) responses to those comments
regarding the Proposed Plan (PP) for the Vega Alta Public Supply Well Superfund Site
("Site") in Vega Alta, Puerto Rico. EPA's preferred remedial alternative addresses the
second of two operable units (OU-II). This remedy will address the primary remaining
source of contamination and the potential migration of contaminants from the soil to
groundwater. The contaminated groundwater is the subject of the first operable unit
(OU-1).

EPA held a public comment period from July 30, 1997 through August 29, 1997 to
provide interested parties with the opportunity to comment on the PP for the Site.

On August 20, 1997, EPA presented its preferred alternatives for the Site to the
community.  EPA held a public meeting for the general public at 7:00 p.m. in the
Municipal Assembly Room of Vega Alta Town Hall, Vega Alta, Puerto Rico.
Approximately 36 people attended the meeting.

EPA conducted the briefing and the meeting in Spanish as Spanish is spoken by the
majority of the local residents. EPA made English and Spanish versions of the PP
available to the public for their review prior to the public meeting. The Site information
repositories are located at the Vega Alta Municipal Town Hall, Vega Alta, Puerto Rico;
the Puerto Rico Environmental Quality Board (PREQB) library in San Juan, Puerto
Rico; EPA's Regional Office at 290 Broadway, New York, NY; and EPA's Caribbean
Environmental Protection Division Office at 1492 Ponce de Leon Avenue in San Juan,
Puerto Rico.

Based on the comments received during the public comment period, EPA believes that
the residents and town officials of Vega Alta are in agreement with the PP and support
EPA's preferred alternative. At the public meeting, citizens and officials raised no
objections to the  PP or to EPA's preferred alternative.

-------
This Responsiveness Summary is divided into the following sections:

I. BACKGROUND ON COMMUNITY INVOLVEMENT AND CONCERNS: This section
provides the history of community concerns and describes community involvement in
the process of selecting a remedy for the Site.

II.  COMPREHENSIVE SUMMARY OF MAJOR QUESTIONS, COMMENTS,
CONCERNS, AND RESPONSES: This section summarizes the written comments EPA
received during the public comment period, oral comments received at the public
meeting, and EPA's responses to both.

In addition to Sections I and II, a list of EPA community relations activities conducted at
the Site is included as an attachment to this Responsiveness Summary, A Spanish
transcript of the proceedings of the public meeting is available in the information
repository.
I. BACKGROUND ON COMMUNITY INVOLVEMENT AND CONCERNS

The Vega Alta Public Supply Wells Site is located north of the town of Vega Alta.
Groundwater is the primary source of water for the public water supply system, as well
as other private (industrial, commercial and agricultural) users. The Vega Alta
municipal well fiefd became a concern of EPA in June 1983 after the discovery of
trichloroethene (TCE), a volatile organic compound (VOC), in a groundwater sample
collected by the United States Geological Survey (USGS) from a Puerto Rico Aqueduct
and Sewer Authority (PRASA) public water supply well known  as the Ponderosa Well.
Vega Alta is governed by a Mayor and Municipal Assembly, all of whom are elected by
the community to serve four-year terms.

In August 1986, EPA held a public meeting to inform the public about the results of the
OU-I Remedial Investigation.  Notification of such  meeting was published in a local
newspaper.  In September 1987, EPA issued a Record of Decision (ROD) for OU-I
selecting a groundwater remedy which included the provision of a water supply for
Vega Alta. As part of this remedial process, a Public Meeting was held on August 26,
1987.

In August 1989, EPA awarded a Technical  Assistance Grant (TAG) to a citizen group in
the amount of $49,975.  The group recipient, the.Committee for the Rescue of the
Health and Environment of Vega Alta, was  to receive this grant to assist the community
in evaluating technical activities at the Site.

In March 1989 and August 1994, EPA published notices of significant changes to the
OU-l remedy in newspapers of local circulation. The notices informed the public about

-------
the Explanation of Significant Differences (ESD) which modified the 1987 ROD
remedy.

In July 1997, EPA released the PP and Feasibility Study {FS) Report for OU-II to allow
the public an opportunity for comment. These reports are part of the administrative
record and can be reviewed at any of the information repositories.  EPA made Spanish
translations of the PP available for public review and comment as well.

EPA publicized and held a public meeting at the Vega Alta Municipal Town Hall on
August 20, 1997 to describe the FS Report and PP and to respond to citizen concerns.
A transcript of this meeting is available both English and Spanish in the information
repositories {September 1997).

EPA held a 30-day public comment period on the PP. The public comment period ran
from July. 30,1997 through August 29, 1997.

During the comment period, comments were expressed on the following issues:

 •    Implementation of the SVE System: Residents and local officials have
expressed concern regarding the implementation of the Soil Vapor Extraction (SVE)
System.

•     Aquifer Contamination:  Residents arid local officials have expressed concern
regarding the aquifer contamination and its effect on public health and the environment.
II.    COMPREHENSIVE SUMMARY OF MAJOR QUESTIONS. COMMENTS.
      CONCERNS. AND RESPONSES

Public comments on the PP submitted between July 30, 1997 and August 29, 1997 are
summarized and addressed below. EPA has separated oral comments from written
comments. In addition, EPA has categorized the comments by topic and consolidated
similar comments on a single topic. Individual commentors and their questions are
identified in the meeting transcript on file at the information repository.
A.    SUMMARY OF ORAL QUESTIONS AND RESPONSES FROM THE PUBLIC
      MEETING CONCERNING THE VEGA ALTA PUBLIC SUPPLY WELLS SITE

Part I - Summary and Response to Local Community Concerns

Contamination at Site

-------
Comment: Community members asked if the contamination is a real emergency and if
the contamination has reached the aquifer.

EPA Response: EPA does not consider the contamination problem to be an actual
emergency since the soil contaminants are at depths of 20 to 40 feet below the ground
surface; thus, it is really unlikely that people Will come into contact with them. The
groundwater underlying the Site was found to be contaminated in 1983. The
contaminant leveis in some wells were found to exceed drinking water standards for
potable water.  Based on this, PRASA was directed by the Puerto Rico Department of
Health to close the impacted drinking water supply wells.

Comment: A community member and former General Electric (GE) employee stated
that during his 15 year employment at the facility, GE discharged thousands of gallons
of poisons into a ditch, including cyanide, mercury, and lead.

EPA Response: The Remedial Investigation conducted at the Site identified the soils
at the GE Controls Facility as the primary source of'contamination, thus necessitating
the proposed remedial action.

Comment: A community member asked how the soi! and groundwater became
contaminated, when the industry became aware of the contamination, what the industry
has done about it?

EPA Response: The information currently available does not reveal the specific
incident or cause of the release of volatile organic compounds (VOCs).  In 1983,
groundwater samples  collected from PRASA wells revealed the presence of VOCs.
Soon after, the current operators and owner of the Industrial Park were notified of the
contamination. In 1984,  the Site was included  on the National Priorities List (NPL),
and numerous groundwater and soil investigations have been conducted pursuant to
Orders with the Potentially Responsible Parties (PRPs).

Comment: A community member asked whether the operations that led to the release
of contamination had been changed, what measures the facility has taken to ensure
that it would not happen again, and whether there were any regular inspections at the
facility to make sure that the chemicals are properly handled and disposed of.

EPA Response: There is no information regarding a specific incident or type of
operations that caused the contamination.  However, as an active facility, it is subject to
all EPA regulations, EQB regulations, and local regulations regarding the handling and
disposal of hazardous substances, and is also subject to compliance inspections.

Comment: A community member attempted to relate the cleanup time of a Site to the
severity of its contamination by comparing the Vega Alta Site to that of the Upjohn

-------
Superfund Site.  The member asked that since the cleanup of the Upjohn Site took over
10 years and EPA estimated that the cleanup at the Vega Alta Site could take from 5 to
7 years, could one assume that the contamination at the Upjohn Site was worse than
that at the Vega Alta Site?     '•

EPA Response: Each Superfund site has unique characteristics, such as the amount
and type of contaminants that have been released into the environment, that make it
different from other sites. Thus, one should not make assumptions about the severity
of contamination from the comparison of cleanup rates at two unrelated sites. Also,  the
estimated 5 to 7 year cleanup time cited for the Vega Alta Site is only for OU-II, soil
contamination/source control remediation; the groundwater remedy may take
significantly longer.

Logistics of the Cleanup

Comment: Several  community members asked how long it would take to clean up all
the contamination at the Site.

EPA Response: The OU-II (soil) remedy is estimated to take about 4 to 7 years to
complete.  The OU-I (groundwater) remedy may require up to 30 years to restore the
aquifer.

Comment:  Many community members wanted to know who was going to pay for the
cleanup.

EPA Response: Under the Comprehensive Environmental Response, Compensation
and Liability Act (CERCLA or "Superfund" as it is commonly referred to), four classes of
parties, usually referred to as Potentially Responsible Parties ("PRPs"), are liable  for
the costs of cleanup. PRPs generally include the: 1) present owner(s) of a facility, 2)
past owner(s) or operator(s) of a facility at the time hazardous  wastes were disposed
of, 3) generator(s) of hazardous wastes, and 4) transporter(s) of hazardous wastes.
Several PRPs were identified for this Site and have been undertaking the necessary
investigations. However, if no PRPs were identified at a given Site, EPA could use
funds from the Federal Superfund to pay for site investigation and remediation
activities.

Comment: A community member was concerned about who would pay for the cleanup
if the industry (in this case, GE) filed for bankruptcy. He asked if GE headquarters
would be held responsible for the costs if the local GE division filed for bankruptcy.

EPA Response: EPA has no reason to be concerned as to the ability of the PRPs in
this case to fund the cleanup. Also, there is a provision in CERCLA that establishes a
"Superfund" to pay for the cleanup of sites when the PRPs cannot pay or cannot be

-------
located. However, if EPA has to use Superfund money for the cleanup of a Site, EPA
will attempt to recover these costs from the PRPs at a later time.

Comment: Community members were concerned that, although the PRPs may agree
to pay for the cleanup at the time of the PP, what happens if the cleanup time and costs
exceed those in the Agreement.

EPA Response: Regardless of the costs or length of  time for the cleanup, the PRPs
are still liable, whether or not they agree to pay for the cleanup. EPA has the authority,
and has used such authority at this Site before, to order the PRPs to undertake the
necessary investigations and response actions.

Comment: A community  member asked if the Commonwealth  of Puerto Rico is
considered a PRP, since the Puerto Rico Industrial Development Company (PRIDCO),
owner of the property, is an agency of the Commonwealth.

EPA Response:  Since PRIDCO is the owner of the Industrial Park and leased facilities
in the Industrial Park to GE and other PRPs at the time that hazardous substances
were disposed of at those facilities, PRIDCO is considered a PRP for the Site.

Comment: A community  member stated that it had been 14 years since the Site was
first investigated in 1983.  The member asked how long it would take to implement the
Proposed Plan. Another community member asked why it took 14 years to start the
cleanup, and why the source had not yet been located.

EPA Response: The remediation of this Site has been divided  in two remedial phases
or operable units. Groundwater was designated the first phase or operable unit (OU-1).
Because contaminated groundwater was determined to be the primary source of
exposure, it was addressed first.  While the ROD for OU-1 was released in 1987,
modifications were made to this remedy in 1989 and 1994 in response to changes in
pumping stresses induced by new production wells. The remedial action for QU-I was
initiated in 1994 with the start-up of the Ponderosa Well and Treatment System.

The source of the groundwater contamination has recently been identified as the soils
near the GE Controls Facility in the Industrial Park; this is noted in the PP. Before the
remedy proposed in the PP is constructed, a necessary remedial design phase has to
be completed.  This design phase could take up to a year or two and after that,
construction would proceed.  The estimated construction time for OU-H (soil/source
control) is approximately 8 months, and the cleanup is expected to take 48 to 60
months (4 to 5 years).

-------
Technical Issues Regarding Cleanup

Comment: A community member asked how many wells were closed and what were
their pumping rates.  The member also asked how much water will be pumped from the
vapor extraction wells.

EPA Response: Approximately seven extraction wells, with an estimated pumping rate
of 3,150 gallons per minute (gpm), have been closed due to the presence of VOCs.  A
groundwater supply well is a well that extends below the water table and is used to
extract groundwater for either drinking or industrial use; a SVE well is a dry we!! used to
extract only VOC vapors from the soil.

Comment: A community member wanted to know the approximate amount of treated
groundwater to be discharged from the welts, specifically from the Ponderosa Well.

EPA Response: Treated groundwater from the Ponderosa Well and Treatment System
is currently being discharged to Honda Creek. The system was designed to treat
•approximately 600 gallons per minute (gpm). However, there have been mechanical
failures and loss of electricity in the area, resulting in performance fluctuations.  The
average discharge per month has varied from 24 to 570 gpm.    , .          .

Comment: A community member cited  the cleanup rate for VOCs in soil of 3 Ibs/hr or
15 Ibs/day, and asked why and how this rate was judged sufficient for cleanup when the
industry was polluting at a rate of 24 hrs/day.
                                         t

EPA Response: The numbers refer to emission rates, not soil cleanup rates. The
limits for VOC emissions to the atmosphere are established in the Federal Clean Air
Act.  Air quality emissions were also established by the Puerto Rico Regulation for the
Control of Atmospheric Pollution (PRRCAP), Rule 419. The maximum limit for such
emissions is 3 Ibs/hr or 15 Ibs/day.

Comment: Members of the community  expressed concern regarding the toxic vapors
to be extracted from the soil. They wanted to know where the vapors go once they are
extracted.

EPA Response: EPA explained that SVE is a technology which removes VOCs from
the soil by inducing air flow through the  soil, using a vacuum for extraction. The flowing
air volatilizes the compounds and carries them through extraction wells to a SVE unit,
where they are treated or released to the atmosphere untreated. The SVE system may
include air treatment to ensure that air discharges do not exceed permissible limits. As
long as the emissions stay within the limits of the PRRCAP, there should be no harmful
effect on air quality.
                                      8

-------
Comment: A community member asked if the 15 Ib/day standard took into account the
synergetic effects of the chemicals.

EPA Response: Synergetic effects were not considered. However, EPA does utilize
an additive risk approach for individual chemicals to compensate for a lack of
comprehensive scientific information on chemicals capable of causing synergistic
effects.

Comment: A community member asked how many technologies were included  in
EPA's Presumptive Remedy Guidance to treat VOCs. The member also inquired if
bioremediation had been considered for this Site.

EPA Response:  EPA stated that there are three technologies described in the
Presumptive Remedy Guidance applicable to the Vega Alta Site: 1) soil vapor
extraction, 2} incineration, and 3) low temperature thermal desorbtion.

Bioremediation was not considered feasible in the source area because of the lack of
oxygen and indigenous organisms required for bioremediation to be successful.  In
addition, bioremediation is not effective for treating all of the VOCs present at the Site.

Public Participation Process

Comment: A community member expressed  concern that EPA's presentations were
too technical, and that unless one is educated about technical matters, it  is difficult to
determine the significance of some of the data.  He cited the term "parts  per million" as
an example of something that a lay person would not be able to  understand without
explanation from EPA.

EPA Response: EPA's public participation process includes a public meeting in which
EPA representatives will answer questions from the public as well as present the
Proposed  Plan.  Public meetings are intended to facilitate a better understanding of
EPA's investigations to affected and/or interested citizens.

Comment: Members of the community also expressed concern about educating
students so that they could fully participate in future environmental decisions involving
their welfare. Observations were made about the lack of environmental curriculum in
the area's high schools. Questions were asked  whether EPA could assume
responsibility for educating students or if GE might be required to pay for community
education.

EPA Response: Educational grants are available through EPA to provide financial
support for projects which design, demonstrate or disseminate environmental education
                                      9 .

-------
practices, methods or techniques, [Note: additional information on educational grants
was provided to the commenter after the public meeting].

Comment:  'A community member wanted to know if GE had been informed of the
findings of the study and of the public meeting.

EPA Response:  GE is well aware of the findings and the public meeting.

Comment:  A community member asked if public meetings really have any impact on
the final remedial decision.

EPA Response:  EPA relies on public input to ensure that the concerns of the
community are considered in selecting an effective and appropriate remedy for each
Superfund site. Public comments are evaluated and later addressed in the
Responsiveness Summary of the ROD. If public comments necessitate modifications
to the Proposed Plan, such modifications will be reflected in the ROD.

Regional Contamination

Comment:  A member of the assembly asked if the Maguayo and Ponderosa Wells
drew water from the same aquifer, and how this condition was determined.

EPA Response:  There are two primary aquifers in the area, an unconfined upper
aquifer and a confined aquifer. The Maguayo and Ponderosa Wells both draw water
from the unconfined aquifer.

Comment:  A community member expressed concern that industries from other areas,
such as Vega Baja and Dorado, could contaminate wells in Vega Alta.

EPA Response:  Studies and  investigations conducted at and in the vicinity of the Site
do not indicate any contaminant threat from other industries to the Vega Alta area.

Comment: A community member asked if sediment samples were collected from
Honda Creek, and expressed concern that if the contamination plume crossed the
Creek, it may also reach the Rio-Cibuco River.
                                                                  i
EPA Response:   VOCs were not detected in surface water samples collected from
Honda Creek and, as such, no impact to Rio-Cibuco is expected.

Comment: A community member asked how many contaminated sites there were in
Puerto Rico, and how this number compared with the number of sites in the continental
United States.
                                     10

-------
EPA Response: There are currently ten sites in Puerto Rico that are listed on the NPL
and there are 1,204 sites for the entire United States. There are numerous other
hazardous waste sites that are not listed on the NPL. Sites become listed because
they present, or potentially present, a threat to public health or the environment.

Other Environmental Concerns Not Related to the Site

Comment: Community members, including a member of the Group for Better
Environment, expressed concern regarding the Pampanos quarry. According to one
community member, the original plan to build a  housing development has been
changed in order to create a quarry. She cited a study conducted by Careb
contractors, which determined that the wetlands should not be developed, and if a
housing development was to be built, then a barrier for the wetlands would have to be
constructed. She also said that the headwaters of the Quebrada were disturbed and,
as a result, wetlands were destroyed. Community members wanted to know what EPA
could do about the situation, and also asked if EPA could spend funds to clean up the
contamination {specifically, solvents) at the quarry.

EPA Response: The installation and operation of quarries is regulated by local
agencies such as the Puerto Rico Planning Board, Puerto Rico Department of Natural
Resources & Environment (DNR&E) and the Environmental Quality Board. EPA's
regulations at 40 C.F.R. Part 60 (New Source Performance Standards) apply to
quarries with a capacity greater than 150 tons/day.  The correct name of the facility is
the Vega Alta Quarry.  Any activity involving changes to wetlands such as  landfilling or
regrading is regulated by the U.S Corps of Engineer.
                                                                  •.
Comment: A community member expressed concern regarding  tanks containing toxic
materials that were still  in the neighborhood of Espinosa despite the fact that the
incineration has been completed.

EPA Response: The tanks in question are part of the Safety-Kleen Envirosystem Co.
facility. This facility is permitted by EQB and EPA to store hazardous waste for
subsequent transportation to the continental United  States for treatment

Comment: A community member inquired if EPA's new ozone standards  were going
to be implemented in Puerto Rico.

EPA Response: EPA  stated that the new standards would be implemented in Puerto
Rico.

Comment: A community member expressed concern that young people sometimes
removed the catalytic converters from their automobiles and consequently were
polluting the air.

                                     11

-------
EPA Response: EPA stated that they are aware of this problem and are working with
the EQB to set up an inspection program to ensure that catalytic converters are used
properly.
B.    Summary of Written Questions and Responses Received During the Public
      Comment Period

1. Comments from the Puerto Rico Industrial Development Company (PRIDCO)

Comment:  PRIDCO asked if the remedy insures that workers at the Site will be safe
from VOC exposure.

EPA Response : Maximum concentrations of VOCs were detected at the PRIDCO
Industrial Park soils at a depth of about 30 feet. Current worker exposure was not
assessed since no direct contact with contaminated soil is expected.

The application of the SVE will greatly  reduce the VOCs in soils, thus reducing their
vertical migration to the groundwater.  In turn, this action will reduce the length of time
required to achieve groundwater cleanup goals by preventing VOCs from continuing to
enter the groundwater.

Comment:  How will  the decision to "turn off the  SVE system be made?

EPA Response: The SVE will operate until VOCs can no longer be effectively
removed. Soil samples will be collected after the  implementation of the SVE program
to determine the soil  concentrations that remain.

Comment:  In general, PRIDCO supported the use of SVE for OLMI at the Site.
2. Comments submitted by the proposed Comunidad Monterey and M.R. Vega
Alta, Inc., Santa Cruz, Inc., and Gomera (Dorado), Inc., the owners of the property
near and to the north of the Site.

Comment: Will groundwater cleanup be terminated if SVE is required?

EPA Response: Groundwater cleanup will not be terminated with the implementation
of SVE. Groundwater remedial activities will continue to operate, and be modified, if
necessary, until the Site remediation goals for groundwater are achieved.

Comments: There is a clear relationship between the groundwater remediation (OUI)
and the soil remediation/source control (OU II).

                                     12

-------
EPA Response:  The remedial action selected for OU II will greatly reduce the vertical
migration of VOCs from the soil to the groundwater. As a result, this action should
reduce the amount of time required to achieve groundwater cleanup by preventing
VOCs from continuing to enter the groundwater.  Activities conducted as part of OU-I
are therefore related to OU-II activities.

Comment:  It is important to know whether adoption of SVE will mean that the concept
of pumping  groundwater near the source will be abandoned or otherwise limited.

EPA Response;  Implementation of the SVE will not eliminate the need for pumping
and treatment of contaminated groundwater at a location near the source. EPA
anticipates issuing an ESD containing such a modification to the OU-I remedy in the
near future.

Comment:  The agency should provide information about the relationship between
decisions made on source control and decisions that may be made to revise the
groundwater remedy.

EPA Response:  EPA's OU-I remedy is a separate action from the source control
remedial alternative proposed for OU-II. The only connection is that by implementing
SVE in contaminated Site soils, the vertical migration of VOCs from soils into
groundwater will be reduced or eliminated. This will reduce the time needed to restore
the aquifer.  In this respect, the OU-I remedy and the OU-II remedy are linked.

Comment:  The groundwater remediation currently depends on operation of the
Ponderosa Well treatment system.' Our review of the. logs of that facility, as well as
review of the drawdown record from an adjacent monitoring well, indicate that the
Ponderosa Well treatment system has never operated as intended.  Thus, we are
concerned that there may not be appropriate data from operations at the Ponderosa
Well to justify adjustments to the groundwater treatment  regime.

EPA Response:  Adjustments to the groundwater treatment regime will not be based
solely on the operation and performance of the Ponderosa Well, but will also be based
upon information  regarding the location of the highest VOC concentrations relative to
the areal extent of the plume, pumping stresses induced by production wells within the
affected area, monitoring data to be collected over a period of time, the evaluation of a
groundwater model developed specifically for the Site, and the aquifer's response to
the pumping and  treatment.

Comments: How do the risk levels between soil and groundwater contamination
correlate? The Proposed  Plan addresses the risk levels for contaminants in the soils.
EPA selected SVE in order to reduce those risk levels.  EPA should provide information
about how much SVE will shorten the groundwater cleanup time frame.  It would also
                                      13

-------
help to know if EPA has any information about the quantitative impact SVE will have on
the duration of the contamination in the groundwater.

EPA Response:   Operation of the SVE System will minimize the amount of VOCs that
may migrate from the soil to the groundwater.  Once the source of contamination is
removed and the groundwater remedial measures are in place, we should see a
significant reduction in the VOC concentrations in the groundwater near the source
area.  No information is currently available regarding how much SVE will shorten the
groundwater cleanup time frame or the quantitative impact SVE will have on the
duration of the contamination in the groundwater.

Comment: The paved areas at the Industrial Park do not sufficiently "cap" the
contaminants.

EPA Response:  Part of the source area is currently covered with pavement, concrete,
or buildings which prevent the infiltration of rain water into the soils. This does reduce
the leaching potential of the VOCs from the source soils into the groundwater.
However, EPA agrees that the paved areas are not a sufficient "cap" for the entire
remaining source of contamination; thus, we are selecting a remedy involving the use
of SVE to permanently remove VOCs from the Site.

Comment: Will the plant be closed, in whole or in part, or over some period of time?
Will EPA seek to avoid plant shut downs and will this adversely impact the success of
SVE in cleaning the .soils? To the extent that these decisions are made following the
public comment period, it is important for EPA to keep the public informed of any such
determinations.
                                                                   .*

EPA response: The proposed SVE system will be designed and implemented in a
staged approach which wifl involve the use of at least one mobile SVE unit.  The mobile
unit will be operated at a designed area until no more VOCs can be removed at that
location. The unit will then be moved to another designated area for treatment. The
GE Controls Plant is an active facility and, as such, the SVE system will be operated in
a manner to avoid interfering with plant operations to the greatest extent possible while
not sacrificing the effectiveness of the remedy.

Comment:  How long will the SVE system operate? When will the SVE system be
operational?

EPA Response:  It is unclear at this stage how long the SVE system will be in
operation.  Typically, SVE systems are operated until no more product can be
recovered or until cleanup goals are achieved.  !n the Feasibility Study Report, a ten-
year operation scenario was assumed, however, it is more likely that this phase of the
remediation will be completed in a shorter period of time.  Assuming the PRPs'

                                      14

-------
willingness to undertake SVE, the design phase may take 1 to 2 years to complete.
Actual operation of the SVE system will follow.

Comment: What will EPA do if General Electric refuses to implement SVE?

EPA Response:  EPA can exercise its enforcement authority under CERCLA to compel
the PRPs to implement the required remedial actions at the Site.

Comment: EPA's Proposed Plan leaves the impression that the risks are the same
throughout the region,  but they are  not. The groundwater is contaminated at different
levels in the aquifer, very high near the industrial park and lower elsewhere in the
region. Future residents who are located a distance away from the GE Controls Plant
do not face the same risk as those close to the plant; nor do people located at the GE
Controls Plant face high actual risks.

EPA Response:  In order to protect public health and the environment, EPA's risk
assessment considered risks and hazards to individuals exposed to reasonable
maximum levels under current and future conditions.  The assessment used data from
samples taken in  the aquifer.  Where adequate numbers of samples were available to
support the calculation of the 95% upper confidence level on the mean, this value was
used as representative of the concentration to which  users of the aquifer were exposed.
The sampling concentrated in the areas with the highest concentrations of soil
contamination with less samples taken in areas where the concentration was lower.
Where adequate  numbers of samples to calculate the 95% upper confidence level were
not available, the maximum concentration found in the aquifer for an individual
chemical was used in the assessment, i.e., it was assumed that an individual may be
exposed to the highest concentration found in the aquifer.   In addition, the
concentrations found in all wells were also compared in the assessment to the
Maximum Contaminant Levels (MCLs). MCLs are enforceable limits under the Safe
Drinking Water Act and are designed to ensure the quality of the population's drinking
water supplies.

Comment: The risk discussion does not advise the public of the nature of the
carcinogenic and non-carcinogenic hazard. What kind of cancer risks are presented?
What are the non-carcinogenic hazards?

EPA Response:  EPA developed a risk assessment that evaluated future risks from the
chemicals in the groundwater in the absence of remediation at the  Site. The
calculated risks are based on a number of assumptions and represent a probability of
an individual developing cancer as a result of  specific exposures. The exposure
assumptions are listed below.
                                     15

-------
Ingestion of Water.
Dermal Contact:
Carcinogen Assessment for Adults

       The cancer risk assessment for the adult residents
       assumed an individual consumed 2 liters of water/day
       (8 eight ounce glasses per day) at the current
       contaminant level for 350 days per year for the next
       30 years and weighed 154 Ibs. These are standard
       default assumptions used  in EPA's risk assessments
       at other sites.   The calculated risks were
       approximately  3  additional cases  in one thousand
       people exposed under the assumptions listed above.
       The primary chemicals of concern were 1,1-
       dichloroethene, ethylene dibromide, trichloroethylene,
       arsenic, and beryllium. This calculated risk exceeds
       EPA's acceptable risk range.

       Other risks to the residents are associated  with
       contact with metals while showering.  It was assumed
       that an adult resident would shower 350 days/year for
       30 years and would weigh 154 Ibs. The risk is
       approximately 4 additional cases of cancer in
       1,000,000 people exposed under the assumptions
       listed.  This risk is within EPA's risk range.
Inhalation While Showering:
Ingestion:
       The risks from inhalation of contaminants while
       showering were also modeled assuming an adult
       weighed 154 Ibs and would shower 350 days/year for
       30 years.  The risks were calculated at approximately
       4 additional cases of cancer in ten thousand people
       exposed. The main contaminants of concern were
       1,1-dichioroethene and trichloroethene. This risk is
       near the upper bounds of EPA's acceptable risk
       range.
Childhood - Carcinogen Assessment

       The potential risks to children were assessed
       assuming ingestion of water at the current
       concentration for 350 days/year for 6 years at an
       ingestion rate of 1 liter/day and assuming the child
       weighed 30 Ibs.  The risk was calculated at 1 in one
       thousand; the primary chemicals of concern are 1,1-
       dichlorethene, ethylene dibromide and arsenic.  This
       risk exceeds EPA's acceptable risk range.

               16

-------
                        Carcinogen Assessment - Workers

Other Populations:       Risks to site workers/employees and construction workers
                        were also assessed.  This assessment assumed the site
                        workers/employees would be exposed 250 days/year for 25
                        years and ingest 1  iiter/day of water from the Site.  The
                        construction worker was assumed to be exposed for a
                        shorter period of time, i.e., 65 days in one year.  The risk to
                        the site worker was 8 additional cases in 10,000 which
                        slightly exceeds EPA's acceptable risk range. The primary
                        chemicals of concern were 1,1-dichloroethylene, ethylene
                        dibromide and arsenic. The risk to the construction worker
                        was calculated to be 8 additional cancers in a population of
                        1,000,000, which is within EPA's acceptable risk range.

                        Evaluation of Non-Cancer Hazards

For non-cancer evaluation, EPA uses a Reference Dose as an indicator of potential
non-cancer effects. The Reference Dose is defined "as a daily exposure level (with an
uncertainty spanning perhaps an order of magnitude) that is likely to be without an
appreciable risk of adverse health effects for humans." To evaluate non-cancer effects,
EPA evaluates the exposures using the exposure assumptions identified for cancer
above with the exception that the average time reflects a different averaging time. The
exposure is then compared to the Reference Dose to determine whether, this value is
exceeded for either an individual chemical or pathway. The total hazard is also
evaluated by combining the individual Hazard Quotients for each chemical and
pathway to determine the total Hazard Index.  The results of this analysis for the   .
individual populations potentially exposed are listed below.

                   Evaluation of Non-Cancer Hazards for Adults

Ingestion:                     For ingestion of water, using the exposure
                              assumptions identified in the cancer assessments,
                              the Hazard Index (HI) was 9.4. The HI was 6.5 for
                              trichloroethyfene and  1.9 for arsenic.  The His for the
                              other chemicals were less than 1.0,

                              For dermal contact while showering, and inhalation of
                              volatile organic chemicals, the hazard indices were
                              less than 1.0, respectively.
                                       17

-------
                      Non-Cancer Assessment for Children

Ingestion:                     The HI for children, using the exposure assumptions
                             used in the carcinogen assessment, was 22.  The
                             main chemicals contributing to this hazard were
                             trichioroethene (15) and arsenic (4.3); the remaining
                             chemicals contributed less than 1.0.

    Non-Cancer Assessment - Site Workers/Employees and Construction Workers

Site Workers/Employees
and Construction Workers:      For site workers/employees and construction
                             workers, the assumptions used in the cancer
                             assessment were used.  The HI for construction
                             workers was less than 1.0. The Hi for site
                             workers/employees was 3.4, exceeding the
                             acceptable level of 1.0.  The primary chemical of
                             concern was trichloroethylene with an HI of 2.3.

Comment:  EPA should provide realistic information about how long the aquifer will be
contaminated and when the community can expect to be able to tap the aquifer again.

EPA Response:  It is estimated that the aquifer might take up to 30 years to return to
its original condition as a potable water source.

Comment:  We support EPA's efforts to use SVE to control the sources of
contamination in the soils at the GE Controls Facility. However, we want to emphasize
that SVE is not a substitute for groundwater treatment near the sources or elsewhere in
the contaminated plume.

EPA Response: The adoption of SVE as a source control action does not mean that
near source pumping of groundwater will be abandoned or otherwise limited.
3.    Comments from the Vega Alta Steering Committee.

Comment: The Proposed remedy is not justified based upon potential risks posed by
the Site.  The Proposed remedy is based upon a flawed risk assessment.

EPA Response-^The highest concentrations of VOCs in soil and groundwater were
detected at the GE Controls facility. The SVE Performance Test Result Report
submitted to EPA on February 1996 by the Vega Alta Steering Committee determined

                                     18

-------
that the use of the SVE was effective in remediating the source soils. SVE will
minimize the migration of VOCs from the soil to the groundwater and reduce the length
of time required to achieve the groundwater cleanup goals.  Groundwater at the Site
presents an' unacceptable risk to human health.  Groundwater samples have revealed
VOC concentrations up to 6,000 ppb.  These levels  are significant in relation to the
MCLs.

The risk assessment was re-evaluated based on the comments received from  the Vega
Alta Steering Committee.  Detailed responses to those comments are provided in the
attachment. In summary, the PRPs raised issues concerning the following points:  a)
Inclusion of inorganic compounds in the risk assessment that are inappropriate (e.g.
arsenic, manganese...); b)  Use of inappropriate criteria for the selection of the
chemicals of concern (COCs). c)  Ethylene dibromide was included as a COC
(accounting for more than 42% of the total cancer risk); and d)  COM wrongly assumed
a log normal distribution for each constituent in calculating the 95 % UCLs.  Brief
responses to each of these issues is provided below.

a and b.  Inclusion of arsenic and  other metals as chemicals of concern.

Arsenic was retained as a chemical of concern since it is a known human carcinogen
and contributed significantly to the risk as outlined in the Risk Assessment Guidance
for Superfund.  The risk assessment identifies that this chemical is below the MCL and,
consequently,  is not addressed in the Feasibility Study. The risks and hazards posed
by the other metals did not exceed EPA's  risk values and their inclusion does not
impact the risk assessment. The risks from trichloroethylene and other volatile organic
compounds still exceed EPA's acceptable risk range for both cancer and non-cancer,
supporting the conclusions that further remediation at the Site is warranted.

c.  Ethylene dibromide.

The data sheets were re-evaluated by EPA's contractor and the transcription error was
verified.  However, the risks posed by trichloroethylene and the other volatile organic
compounds still exceed EPA's acceptable risk range and, therefore, require
remediation.

d.  95% Upper Confidence Limit

The analysis of the data distribution presented in Table I of the Vega Alta Steering
Committee Report  indicates that the  Responsible Party was not able to demonstrate
the data distribution. The "Supplemental Guidance to RAGS: Calculating the
Concentration Term" guidance indicates that"... it is valuable to plot the data to better
understand the contaminant distribution at the site".   Following this guidance, COM
evaluated the groundwater data (page 50) and applied the formula for calculating the
                                      19

-------
UCL of the arithmetic mean for a lognormal distribution as recommended in the
guidance.

Comment: -The Proposed Plan failed to consider the influence of the planned OU-I
remedy on the appropriateness of any remedy selected for OU-I I.

EPA Response: The OU-I remedy and/or any modification to it will remediate the
groundwater.  However, soil remediation is needed in order to avoid further migration of
contaminants  into the groundwater.  The concurrent implementation of both remedies
will expedite the cleanup of the Site.

Comment:  The Proposed Plan overestimates the potential contribution of VOCs from
soil to groundwater.

EPA Response: The OU-I I Remedial Investigation showed that the highest
concentration of VOCs in the groundwater was located near the source area. This data
indicates that  the VOCs from soil are leaching into the groundwater.  In recent SVE
performance tests, 553 pounds of VOCs were removed from the extraction wells at the
source area in a 28 day period.  This result clearly demonstrates the effectiveness of
this approach and the fact that implementation of SVE will greatly reduce the migration
of VOCs to the groundwater.

Comment:  The 1994 ESD was technically appropriate due to concerns regarding
saltwater intrusion and not due to plume migration, as stated by EPA in the Proposed
Plan.

EPA Response: As stated in the 1994 ESD: "EPA must change the location of the
extraction wells selected in the 1987 ROD, because recent groundwater investigations
at the Site show that in the six years since EPA issued the  ROD, the plume of
groundwater contamination has migrated downgradient of three of the extraction wells
{GE-1, GE-2,  and Bajura 3} selected in. the 1987 ROD, and that these wells are no
longer capable of effectively remediating the Vega Alta Aquifer."

Comment:  EPA stated that the Site "groundwater contamination exists in ah
unconfined aquifer that is used for public, agricultural, industrial, and private water
supply." The  steering committee believes that this statement is misleading and should
indicate that Site groundwater is not currently used for drinking  water.

EPA Response:  Both public and private wells currently withdraw water from the
unconfined aquifer. Several wells have been closed due to the VOC contamination, but
others have remained operational. While EPA has informed the users of the affected
or contaminated wells that the water should not be utilized for drinking water purposes,
we cannot confirm that the water is not being used for such purposes.

                                     20

-------
Comment:  The implementation of the OU-II remedy will cause a slowdown or possible
shutdown of plant operations.

EPA Response:  While a slowdown or shutdown of plant operations may be necessary
during the implementation of SVE, the implementation will be managed in a way to
minimize any interruption to plant operations.

Comment:  Termination criteria for SVE should be based on the reduction  of soil gas
VOCs as measured relative to baseline sampling performed in the air stream before
initiating SVE and should be incorporated in the ROD.

EPA Response: The SVE system will operate until VOCs can no longer be effectively
removed from the source area. Specific criteria for SVE shutdown will be included in
the Remedial Deign Report, Remedial Action Work Plan,  and in the Operation and
Maintenance Plan to be submitted to and approved by EPA.
                                     21

-------
                              ATTACHMENT 1

                    COMMUNITY RELATIONS ACTIVITIES
                 AT VEGA ALTA PUBLIC SUPPLY WELLS SITE

Community relations activities conducted at the Vega Alta Superfund Site to date have
included, but are not limited to the following:
•     EPA publicized and held a public meeting on August 19,1986 to inform the
      public about the findings of the Remedial Investigation (Rl). (OU-I).

•     EPA publicized and held a public meeting at the Vega Alta Town Hall on August
      26, 1987 to describe EPA's proposed plan for OU-I and to respond to public
      questions and comments. (OU-I).

•     EPA published a Notice of Significant changes to the 1987 ROD-selected
    -  remedy on March 22, 1989 ("1989 ESD"). {OU-I}.

•     EPA published a second Notice of Significant changes to the OU-I remedy on
      August 26, 1994.  This remedy was selected in the 1987 ROD and initially
      modified by the 1989 ESD. (OU-I).

•     EPA established an information repository at the Vega Alta Municipal Town Hall.
      Copies of the documents in the repository were also placed in files in EPA's
      offices in San Juan, and New York, as well as at the Environmental Quality
      Board Office.  Administrative Records for both operable units are continually
      updated and additional documents are supplied to each repository. (OU-I & OU-
      II).

•     EPA released the Proposed Plan (PP) and Feasibility Study (FS) Report to allow
      the public an opportunity for comment. These reports are part of the information
      repository. (July 1997).  EPA made Spanish translations of the PP available for
      public review and comment. The PP is also part of the information repository,
      (July 1997). (OU-II).

•     EPA publicized and held a public meeting at the Vega Alta Town Hall on August
      20, 1997 to discuss the FS Report and PP and to respond to public comments.
      A transcript of this meeting is available in the Site information repository in both
      English and Spanish (September 1997).  (OU-II).

•     EPA held a 30 day public comment period on the PP. The public comment
      period ran from July 30,  1997 through August 29, 1997. (OU-II).

•     EPA prepared a Responsiveness Summary to address public comments
      received in writing and at the public meeting (September 1997).  (OU-II).

-------
   ADMINISTRATIVE RECORD INDEX

VEGA ALTA PUBLIC SUPPLY WELLS SITE
     VEGA ALTA, PUERTO RICO

           APPENDIX E

-------
                      VEGA ALTA SITE
                    OPERABLE UKIT TWO
               ADMINISTRATIVE RECORD INDEX
                    INDEX OF DOCUMENTS
1.0  SITE IDENTIFICATION

l.l  Background -. RCRA and Other Information

P.   100001- % Hazardous Ranking System Package,  reviewer: Mr.
     100020    Wayne Pierre, PRASA, June17, 1983.  (Note: This
               document is CONFIDENTIAL.  It is located at U.S.
               EPA Superfund Records Center, 290 Broadway, 18th
               Floor, N.Y., N.Y. 10007-1866).

P.   100021-   Report: The Application of CERCIA in Puerto Rico:
     100045    An Options Paperr -prepared by the Hazardous Waste
              .Site Branch, Air & Waste Management Division, U.S.
               EPA, Region II, July 7, 1983.

P.   100046-   Memorandum to Mr. Pedro A. Gelabert, Chairman,
     100073    Commonwealth of Puerto Rico, Environmental Quality
               Board, from Mr. Luz V..Garcia, Chemist, Common-
               wealth of Puerto Rico, Environmental Quality
               Board, re: Requested Report from Kevin Lynch
               regarding Ponderosa Well Contamination in Vega
               Alta, August 17, 1983.  Attached: (1) Letter, to
               Mr. Kevin Lynch, On-Scene Coordinator, U.S. EPA,
               Region II, from Mr. Pedro A. Gelabert, Chairman,
               Commonwealth of Puerto Rico, Environmental Quality
               Board, re: the attached enclosed report of the
               information requested on letter, dated June 30,
               1983, to investigate the Ponderosa Well pollution
               sources in Vega Alta, August 16, 1983; (2) Listing
               of Addressees to which Information Request is
               being sent  (includes handwritten comments),
               undated;  (3) Table 2 - Hazardous Substances at the
               Wellhead Compounds in ppb;  (4) Table 3 - Hazardous
               Substances Involved and concentrations Detected
               After Treatment or in the Distribution System,
               undated; and  (5) Hazardous Waste Report, prepared
               by U.S. EPA, March 17, 1982.

-------
1.3  Preliminary Assessment Reports
P.   100074-   Preliminary Assessment Review Form, Reviewer: Mr.
     100098    Juan Davila, U.S. EPA, Region II, November 7,
               1984.  Attached: (1) Potential Hazardous Waste
               Site Identification and Preliminary Assessment,
               prepared by Maria L. Morales, U.S. EPA, .May 14,
               1984; (2) Annexes 1 -3; (3) Request for Analysis;
               and .(4) Attachment C: Potential Hazardous Waste
               Site, Site Inspection Report, April 17, 1984.

1.4  Site Investigation Reports

P.   100099-   Report: Draft Site Inspection Report Vega Alt a
     100119    Solid Waste Disposal - Field Investigation Team
               Activities at Uncontrolled Hazardous Substances
               Facilities - Zone lf prepared by NUS Corporation,
               Superfund Division, prepared for Environmental
               Services Division, September 12, 1988.

1.5  Previous operable Unit information
P.
P.
     100120
     100143

     100144
     100165
P.   100166
     100170
               Data:  "Draft 10-Point Document,  Immediate
               Removal Request",  undated.

               Letter to Mr. Scott A. Baker, Supervisor,
               Hazardous Materials and Environmental Services,
               The West Company, from Mr. Stephen P. Cline,
               Project Manager, Environmental Resources
               Management, Inc., re: The West Company Site, Vega
               Alta, Puerto Rico, February 9, 1988. (Attachments:
               (1) 'Standard Method for Penetration Test 'and
               Split-Barrel Sampling Of .Soils" (2)  'standard
               Method for Thin-Walled Tube Sampling of Soils"
               (3) "Standard Method for Particle-size Analysis of.
               Soils" and, data (4)  Table 1:  'Methodology  Summary
               and References".)                            -

               Letter to Mr. Stephen D. Luftig, Director,
               Emergency and Remedial Response Division,, U.S.
               EPA, Region II, from Mr. Santos Rohena Betancourt,
               Chairman, Commonwealth of Puerto Rico       .
               Environmental Quality Board, re: Vega Alta
               Superfund Site, March 21, 1989. (Attachment:
               Letter to Mr. Douglas Blazey, Regional Counsel,
               Office of Regional Counsel, U.S. EPA, Region II,
               from Mr. Santos Rohena Betancourt, Chairman,
               Commonwealth of Puerto Rico Environmental Quality
               Board, re: Vega Alta Superfund Site, .October 17,
               1968.)

-------
p.
p.
p.
 100171-
 100198
100199-
100377
100378-
100421
Veaa Alt a Suer fund
P.   100422-
     100422
     100423-
     100435
P.   100488-
     100498
Presentation Materials:
Vea Alta . Puerto Rico, prepared for U.S
                   '
                                                         EPA,
prepared by General 'Electric Company, April 13,
1989.

Plan:     Praft Sampling,, Analysis and Monitor j.n.g
Plar) (SAMP) , Veaa Alta fiuperfund Site per
Administrative Order TI-CERCLA*-g0302f prepared by
General Electric Company, May 12, 1989.
Plan:     Final Statement of Work for Remedial
Design for the Vega Alta Well Field Site. Vega
Alta. Puerto Ric9r "prepared for Motorola, Inc.,
Barman Automotive, Inc., The West Company of
Puerto Rico, Inc., prepared by Environmental
Resources Management, Inc., January 8, 1990.

Letter to Ms. Debra Kroblewski, NUS Corporation,
from Mr. Jose C. Font, Project Manager, U.S. EPA,
Region II, re: submittal of Draft Statement of
Work for the Remedial Design for the Vega Alta
site and Unilateral Administrative Order for the
site, June 13, 1990.

Letter to Eduardo Negron-Navas, Esquire,
Fiddler, Gonzalez & Rodriguez, from Ms. Susan T.
Barry, Project Manager, Environmental Resources
Management, Inc., re: attached Analytical results
of purged water from the Vega Alta July 1990
sampling event, September 10, 1990.  (Attachment.)
100436-   Report:   Vega Altaf Puerto Ricor August
•100487
               progress 'Report r • prepared 'for "Vega Alta "Project
               Manager, Site Compliance Branch, Emergency and
               Remedial Response Division, U.S. EPA, Region II,
               prepared by Ms. Susan T. Barry, Project Manager,
               Environmental Resources Management, Inc.,
               September 21, 1990.  (Attachments: Appendices A-
               C.)
Report:
                    Veya^Mtar Puerto Rlcof September 1990
                   Report, prepared for Vega Alta Project
               Manager, Site Compliance Branch, . Emergency and
               Remedial Response Division, U.S. EPA, Region II,
               prepared by Ms. Susan T. Barry, Project Manager,
               Environmental Resources Management, Inc.,
               October 22, 1990.  (Attachments: data.)

-------
100499-   Letter to Eduardo Negron-Navas> Esquire,
100513    Fiddler, Gonzalez.& Rodriguez, from Ms. Susan T.
          Barry, Project Manager, Environmental Resources
          Management, Inc., re: attached analytical results
          of 'the purged water from the Vega Alta October
          1990 sampling event, November 27, 1990.
          (Attachment.)

100514-   .Report:   Veaa Altaf Puerto Rico/ October and
100517    November 1990 Progress "Reports, prepared for Vega
          Alta Project Manager, site Compliance Branch,
          Emergency and Remedial Response Division, U.S.
          .EPA, Region II, prepared by Ms. Susan T. Barry,
          Project Manager, Environmental Resources
          Management, Inc., December 31, 1990.

100518-   Letter to Mr. Jose Font, Project Manager,
100530    Caribbean Field Office, U.S. EPA, Region II, from
          Ms. Susan T. Barry, Environmental Resources
          Management, Inc., re: Final discharge of purged
          water from the Vega Alta Superfund Site to PRASA,
          January 4, 1991.  (Attachment: data.)

100531-   Letter to Mr. George J. Miller, Esquire, Dechart,
100533    Price fi Rhoads, from Ms. Susan T. Barry, Project
          Manager, Environmental Resources Management,
          Inc., re: Complications during the January 1991
          ground water sampling event at the Vega Alta Site,
          February 12, 1991.     '        .    .

100534-   Letter to Ms. Carole Peterson, Chief, New
100543    York/Caribbean Compliance Branch, U.S. EPA, Region
          II, 'from Mr. Ronald-A.- Landon/. P-.G. ,• ERM Principle
          in Charge, and G.L. Kirkpatrick,  P.G., ERM Project
          Manager, Environmental Resources Management, Inc.,
          re: Vega Alta Public Supply Well Site Remedial. .
          Design EPA ROD dated 23 March 1989, March 5, 1991.

100544-   Letter to Maria Luis Gonzalez, Esquire,
100550    Fiddler, Gonzalez & Rodriguez, from Ms. Susan T.
          Barry, Project Manager, Environmental Resources
          Management, Inc., re: attached analytical results
          of the contained purge water from the Vega Alta
          January 1991 sampling event, March 18, 1991.
          (Attachment.)

100551-   Report:   Vega Alta. Puerto RicQr 'January 1991
100606    Progress Report^ prepared for Vega Alta Project
          Manager, Site Compliance Branch,  Emergency and
          Remedial Response Division, U.S.  EPA, Region II,
          prepared by Ms. Susan T. Barry, Project Manager,

-------
100607-
100610
100611-
100615
100616-
100663
100664-
100665
100666-
100709
100710-
100790
100791-
100831
 Environmental Resources Management,  Inc.,  March
 22,  1991.   (Attachment: Attachment A.)

 Letter to  George J.  Miller,  Esquire,  Dechert,
 Price & Rhoads,  from Mr.  Carl E.  Petrus,^ P.E.,
 Environmental. Resources Management, ' Inc.",' re:
 attached list of information needs for Vega Alta
 site remediation, April 5,  1991.  (Attachment.)
 *              «                       i
 Report:   Vega Alta. Puerto Ricor  February and
 March 1991 Progress  Reports,  prepared .for Vega
 Alta Project Managerr Site  Compliance Branch,
 Emergency  and Remedial Response Division,  U.S.
 EPA,  Region II,  prepared by Ms. Susan T.j'Barry,
 Project Manager, Environmental Resources
 Management, Inc., April 8,  1991.

 Report:   Vega Alta. Puerto Rico.  April and
 May  1991 Progress Reports,  prepared "for Vega
 Alta Project Manager,1 Site  Compliance Branch,
 Emergency  and Remedial Response Division,  U.S.
 EPA,  Region II,  prepared by Ms. Susan T. Barry,
 Project Manager; Environmental Resources
 Management, Inc., June 18,  1991.  (Appendices A-
 B.)

 Letter to  Mr. Pedro  Maldonado Ojeda,  Jr.
 Chairman,  Puerto Rico Environmental  Quality Board,
 from Ms, Kathleen Callahan,  Director, Emergency
 and  Remedial Response Division, U.S.-  EPA,  Region
"II,',,re: U.S. EPAs comments  on April  18, 1991
 meeting,'-June-28,--1991.

 Report:   Vega Alta, Puerto Rico.  June '1991
 progress Report,, prepared for-Vega Alta Project
 Manager, Site Compliance Branch/  Emergency and
 Remedial Response-Division,  U.S.  EPA, Region II,
 prepared by Ms.  Susan T.  Barry, Project Manager,
 Environmental Resources Management,  Inc.,  July  29,
 1991.  (Attachments: Appendices A-B.)
 Report:    Estimate of Probable Construction Cost
 for Ground Water Remediation.  Vega Altaf  Puerto
 Rjgpf  prepared by Environmental Resources
 Management, Inc., August 26,  1991.  (Note: This
 document is CONFIDENTIAL.  It is located at the
 U.S. EPA Superfund Records Center, 290 Broadway,
 18th floor, New York, N.Y. 10007.)
 Plan:      Operating and Maintenance Plan for the
 Vega Alta Well Field Site^  prepared for Motorola

-------
p.
100832-
100908
P.
P.
100909-
100976
100977-
101171
P.
101172-
101231A
P.
101232-
101270
P.
101271-
101273
Telcarro de Puerto Rico, Inc., and The West
Company of Puerto Rico, Inc., prepared by
Environmental Resources Management, Inc., August.
26, 1991.

Report:   Design Analysis Report for the Vega
Alta Well Field site. Veaa Alta. Puerto Rico.
prepared for Motorola Telcarro de Puerto Rico,
Inc., Harman Automotive Puerto Rico, Inc., and The
West Company of Puerto Rico, Inc., prepared by
Environmental Resources Management, Inc., August
26, 1991.

Plan:     Construction Plan for Ground Water
Remediation. Vega Altat Puerto Rico, prepared by
Environmental Resources Management, Inc., August
26, 1991.

Report:   Technical Specifications 'for Ground
Water Remediation, Vega Alta. Puerto Rico. Wells
GE—1. GE-2, Ponderosa, Bajura IIIf prepared by
Environmental Resources Management, Inc., August
26, 1991.
Report:   Vega Alta Site.Puerto Ricof Third
Quarter Calendar Year 199lf Progress Report,
prepared for Vega Alta Project Manager, Site
Compliance Branch, Emergency and Remedial Response
Division, U.S. EPA, Region II, prepared by   Ms.
Susan T. Barry, Project Manager, Environmental
Resources Management, Inc., October 3, 1991.

Letter to Vega Alta Project Manager, Site
Compliance Branch, Emergency and Remedial Response
Division, U.S. EPA, Region II, 'from Ms. Susan T.
Barry, Project Manager, Environmental Resources,
Inc., re: REVISED Vega Alta, Puerto Rico, October
1991 Ground Water Sampling Event, October 11,
1991.   (Attachment: Report: Analytical Quality
Assurance Report, Ground Water Sampl-es collected
April and May 1991f Vega Alta Superfund Site, Vega
Altar Puerto Rico, prepared for Motorola, Inc.,
Harman Automotive, Inc., and The West Company of
Puerto Rico, Inc., prepared by Environmental
Resources Management, Inc., July 3, 1991.)

Report:   Vega Altaf Puerto Ricof October and
typvember 1991 Progress Reports, prepared for Vega
Alta Project Manager, Site Compliance Branch,
Emergency and Remedial Response Division, U.S.
EPA, Region II, prepared by Ms. Susan T. Barry,

-------
               Project Manager, Environmental Resources
               Management, Inc., December 9, 1991.

P.   101274-   Letter to John Zakrison, Esquire, Kirkland &
     101293    Ellis, from Ms. Carole Petersen,  Chief, New
               York/Caribbean Superfund Branch,  U.S. EPA, Region
               II,  re: Vega Alta Public Supply Wells Site 90%
               Remedial Design Report, August 1991, EPA Review
               Comments, December 26, 1991.

P.   101294-   Report:   Estimate of Probable Construction Cost
     101377    for Ground Water Remediationr Vega Altar Puerto
              . RJ.CO, prepared by Environmental Resources
               Management, Inc., January 17, 1992.  (Note: This
               document is CONFIDENTIAL.  It is located at the
               U.S. EPA Superfund Records Center, 290 Broadway,
               18th floor, New York, N.Y. 10007.)

P.   101378-   Plan:     Construction Plan for Ground Water
     101445    Remediation. Vega Alta. Puerto Rico, prepared by
               Environmental Resources Management, Inc., January
               17,  1992.

P.   101446-   Report:   Technical Specifications fpr Ground
     101644    Water Remediationf Vega Altaf Puerto Rico. Wells
               GE-lr GE-2. Ponderosa, Bajura IITf prepared by
               Environmental Resources Management, Inc., January
               17,  1992.                      .

P.   101645-   Plan:     Operating & Maintenance Plan for the
     101686    Veoa Alta Well Field Site, prepared for Motorola
            ... Telcarro. de -Puerto -Rico, • Inc., - and The- West
               Company of Puerto Rico, Inc., prepared by
               Environmental Resources Management, Inc., January
               17,  1992.                      '

P.   101687-   Report:   Design Analysis Report for the Vega Alta
     101758    Well Field Site. Vega Alta. Puerto Ri,pOj prepared
               for Motorola Telcarro de Puerto Rico, Inc., Harman
               Auto Puerto Rico, Inc., and The West Company of
               Puerto Rico, Inc., prepared by Environmental
               Resources Management, Inc., January 17, 1992.

P.   101759-   Report:   Vega Alta. Puerto Rico. December 1991
     101830    and January 1992 Progress Reportsf prepared for
               Vega Alta Project Manager, Site Compliance Branch,
               Emergency and Remedial Response Division, U.S.
               EPA, Region II, prepared by Ms. Susan T. Barry/
               Project Manager, Environmental Resources
               Management, Inc., February 27, 1992.

-------
101831-   Letter to John Zakrison,  Esquire,, Kirkland
101837    & Ellis, and George J. Miller,  Esquire, Dechert,
          Price & Rhoads, from Ms.  Carole Petersen, Chief,
          New York/Caribbean Superfund Branch,' U.S. EPA;
          Region II, re: 100% Remedial Design Report
          (January 1992) for the Vega Alta Public Supply
          Wells Site, March 19, 1992.  (Attachment:
          Construction Plan Summary of Work and Construction
          Schedule.)

101838-   Report:   February 1992 Progress Report for the
101840    Vega Alta Well Field Site, Puerto Ricof prepared
          for Vega Alta Project Manager,  Site Compliance
          Branch, Emergency and Remedial  Response Division,
          U.S. EPA, Region II, prepared by Ms. Susan T.
          Barry, Project Manager, Environmental Resources
          Management, Inc., March 26, 1992.

101841-   Report:   Annual Report for Historical VOC
101858    Distribution in the Ground Water at the Vega Alta
          Superfund Site. Vega A^ta^ Puerto Rico, prepared
          for Vega Alta Project Manager,  Site Compliance
          Branch, Emergency and Remedial  Response Division,
          U.S. EPA, Region II, prepared by Ms. Susan T. .
          Barry, Project Manager, and Mr. Ronald A. Landon,
          P.G., Principal, Environmental  Resources -
          Management, Inc., April 17, 1992.

101859-   Report:   March 1992 Progress Report for the
101927    Vega Alta Well Field Site. Puerto Rico, prepared
          for Vega Alta Project Manager,  Site Compliance
          'Branch;" Emergency"and Remedial  "Response"Division,
          U.S. EPA, Region II, prepared by Ms. Susan T.
          Barry, Project Manager, Environmental Resources
          Management, Inc., April 28, 1992.

101928-   Report:  "April 1992 Progress Report for the
101929    Vega Alta Well Field Siter Puerto Rico, prepared
          for Vega Alta Project Manager,  Site Compliance
          Branch, Emergency and Remedial  Response Division,
          U.S. EPA, Region II, prepared by Ms. Susan T.
          Barry, Project Manager, Environmental Resources
          Management, Inc., May 12, 1992.

101930-   Letter to Mr. Jose C. Font, Project Manager,
101937    Caribbean Field Office, U.S. EPA,  Region II, from
         .Mr. Yaron M. Sternberg, Ph.D.,  Principal, Environ
          Corporation, re: Vega Alta Superfund Site, Vega
          Alta, Puerto Rico, May 21, 1992.  (Attachments:
          (1) Table 1 - Historical VOC Data Table, 1983-
          1989, Bajura III Ground Water Sample Results

-------
          (2)Table 2 - Effluent Limitations for the Bajura
          III Well (3) Table 3 - Historical VOC Data Table,
          1990- Present, Bajura III Ground Water Sample
          Results.)'*''•        ' i- ,-. \

101938-   Letter to Ms.  Bernice I. Gorman, Assistant
101941    Regional Counsel, U.S.  EPA, Region II, from Mr.
          Mark E. Grummer, Kirkland & Ellis, re: Vega Alta
          CERCLA Site, Vega Alta,  Puerto Rico, June 19,
          1992.

101942-   Letter to Mr.  Pedro Maldonado Ojeda, Esquire,
101966    Chairman, Puerto Rico Environmental Quality Board,
          from Ms. Kathleen Callahan, Director, Emergency
          and Remedial Response Division, U.S. EPA, Region
          II, re: July 15, 1992 EPA and EQB Board Meeting
          Agenda, July 9, 1992.  (Attachments: (1)
          Attachment A - Letter to Mr.  Pedro Maldonado
          Ojeda, Esquire, Chairman,  Puerto Rico
          Environmental Quality Board,  from Ms. Kathleen
          Callahan, Director, Emergency and Remedial
          Response Division, U.S.  EPA,  Region II, re: July
          15, 1992 EPA and EQB Board Meeting Agenda, July 9,
          1992, with agenda and attendance sheet attached
          (2) Attachment B - Potentially applicable
          permitting requirements and/or authorizations (3)
          Attachment C - Memorandum to Ms. Rita M. Lavelle,'
          Assistant Administrator for Solid Waste and
          Emergency Response, U.S. EPA, from Mr. Robert M.
          Perry, Associate Administrator for General
          Counsel, re: Applicability of Section 102(2)(c) of
          the National Environmental Policy Act of 1969 to
          Response Actions under Section 104 of the  "
          Comprehensive Environmental Response,
          Compensation,  and Liability Act of 1980, September
          1,  1992 (4) Attachment D - List'of efforts by the
          EPA to incorporate public participation in its
          decision-making processes,  undated.)

101967-   Report:   May/June 1992  Progress Report for the
102045    Vega Alta Well Field Site.  Puerto Rico, prepared
          for Vega Alta Project Manager, Site Compliance
          Branch, Emergency and Remedial Response Division,
          U.S. EPA, Region II, prepared by Ms. Susan T.
          Barry, Project Manager,  Environmental Resources
          Management, Inc., July 24,  1992.  (Attachments:
          Appendices A-B.J

102046-   Letter to Bernice I. Coreman, Esquire,
102051    Assistant Regional Counsel, U.S. EPA, Region II,
          from Mr. Mark E. Grummer,  Kirkland & Ellis, re:

-------
               Vega Alta CERCLA Site—Results of July 21 Meeting
               on OU-1 Progress, July 30, 1992.

P.   102052-   Facsimile to Mr. Carlos M. Padin and Ms. Sara
     102053    Cortes, Department of Natural Resources, from Mr.
        '-•'•    Mark E. Grummer, Kirland & Ellis, re: Vega Alta t
               Puerto Rico, Superfund Site, August 14, 1992.

P.   102054-   Facsimile to Mr. Robert Fuhrer, Puerto Rico
     102057    Aqueduct and Sewer Authority, from Mr. Mark E.
               Grummer, Kirkland & Ellis, re: Vega Alta, Puerto
               Rico Superfund Site, August 14, 1992. (Attachment:
               Facsimile to Mr. Carlos M. Padin and Ms. Sara
               Cortes, .Department of Natural Resources, from Mr.
               Mark E. Grummer, Kirland & Ellis, re: Vega Alta,
               Puerto Rico,.Superfund Site, August 14, 1992.)

P.   102058-   Report:   July and August 1992 Progress Report for
     102059    the Vega Alta Well Field Site. Puerto Rico.
               prepared for .Vega Alta Project Manager, Site
               Compliance Branch, Emergency and Remedial Response
               Division, U.S* EPA, Region II, prepared by Ms.
               Susan T. Barry, Project Manager, Environmental
              -.Resources Management, Inc., September 9, 1992.

P.   102060-   Letter to Ms.  Carol Fetersen, Chief, New
     102068    York/Caribbean Superfund Branch, U.S. EPA, Region
               II, from Messrs. Gerald L. Kirkpatrick, P.G.,
               Project Director and Ronald A. Landon, P.G.,
               Principal in Charge, Environmental Resources
               Management, Inc., re: attached revised letter
               regarding Vega Alta Puerto Rico Public Supply Well
              ' Field "Site; 'Operable"Unit-II' Preliminary  .'.
               Investigation Report Comments, September 11,.1992.
               (Attachment.)

P.   102069-   Letter to Ms.  Carol Fetersen, Chief, New
     102078    York/Caribbean Superfund Branch, U.S. EPA, Region
               II, from Mr. Ronald A. Landon, P.G.,.
               Principal in Charge, Environmental Resources
               Management, Inc., re: attached revised letter
               regarding Vega Alta Puerto Rico Public Supply Well
               Field site, Operable Unit II Preliminary
              - Investigation Report Comments, September 15, 1992.
               (Attachment.)                               ,

P.   102079-   Letter to Vega Alta Project Manager, Site
     102115    Compliance Branch, Emergency and Remedial Response
               Division, U.S. EPA, Region II, prepared by Ms.
               Susan T. Barry, Project Manager, Environmental
               Resources Management, Inc., re: Vega Alta October
                                10

-------
          1992"Ground Water Sampling Event,  Puerto Rico,
          Octobers, 1992.  (Attachments: (1)  Letter to Mr.
          Jose Font, Project Manager, Caribbean Field
          Office, UiS..EPA, Region II,  from Ms. Susan T.
          Barry, Project Manager,  Environmental Resources
          Management, Inc., re: Vega Alta Site Sampling
          Analysis and Monitoring Plan (SAMP), May 18, 1990
          (2) Facsimile to Ms. Bernice Coreman, Esquire,
          Assistant Regional Counsel, U.S. EPA, Region II,
          from Ms. Susan T. Barry, Project Manager,
          Environmental Resources Management,  Inc., re:
          submittal of attached, preliminary results of the
          Vega Alta Site, Puerto Rico,  collected the week of
          July 9, 1990.)

102116-   Letter to Mr. Thomas Trebilcok, from Mr. Mark E.
102117    Grummer, Kirkland & Ellis, re:  Monterrey 2 Well,
          October 16, 1992.             .

102118-   Report:   September 1992 progress Report for the
102119  -  Vega Alta Well Field Sitef Puerto Rico, prepared
          for Vega Alta Project Manager,  Site Compliance
          Branch, Emergency and Remedial  Response Division,
          U.S. EPA, Region II, prepared by Ms. Susan T.
          Barry, Project Manager,  Environmental Resources
          Management, Inc., October 26, 1992.

102120-   Letter to Ms. Carole Petersen,  Chief, New
102126   .York/Caribbean Branch, U.S. EPA, Region II, from
          Carmen E. Marquez Parrilla, Secretaria Suplente, .
          Esatado Libre Asociado de Puerto Rico,
          Administracion de Reglamentos y Permisos, '• (in
          Spanish), October 30, 1992.  (Attachment:
          "Resolucion", prepared by Ana Esther Oyoia  Colon,
          Secreteria, October 30,  1992.)

102127-   Report:   October 1992 Progress^jjeppri; for the
102128.   Vega Alta Well Field Site. Puerto Rico, prepared
          for Vega Alta Proj'ect Manager,  Site Compliance
          Branch, Emergency and Remedial  Response Division,
          U.S. EPA, Region II, prepared by Ms. Susan T. '
          Barry, Project Manager,  Environmental Resources
          Management, Inc., November 24,  1992.

102129-   Letter to Mr. Jose C. Font, Project Manager,
102130    Caribbean Field Office,  U.S. EPA, Region II, from
          Mr. Yaron M. Sternberg,  Ph.D.,  Principal, Environ
          Corporation, re: Vega Alta Superfund Site, Vega
          Alta, Puerto Rico, December 4,  1992.
                           11

-------
102131-
102145
Report:    Progress Report Wo. 1
Water
102146-
102152
102153-
102227
Treatment  Facilities,. Vega Alta. Puerto Rico.
prepared for Mr. Carl E. Petrus, Project Manager,
Environmental Resources Management, Inc., prepared
by Mr. F.  Rene Garcia, Project Manager, Jafer
Construction, S.E., January 8, 1993.
(Attachments:  (l)  Letter to CISCO, from Noel
Fernandez, Vice President, Jafer Construction,
S.E., re:  Ground Water Remediation - Vega Alta,
Ponderosa  Well & Sam Cash & carry, October  6, 1992
(2) Letter "to R,Q. Engineering, from Mr. F. Rene
Garcia, Chief Engineer, Jafer Construction, S.E.,
re: Ground Water Remediation - Vega Alta,
Ponderosa  Well & Sam Cash & Carry, October  6, 1992
(3) Letter to Luis Caratini & Son, Inc., from Mr.
F. Rene Garcia-Ramirez, Chief Engineer, Jafer
Construction, S.E., re: Ground Water Remediation -
Vega Alta, Ponderosa Well & Sam Cash & Carry,
November 6, 1992 (4) Letter to J.P. Industrial
Sales Co., Inc., from Mr. F. Rene Garcia-Ramirez,
Chief Engineer, Jafer Construction, S.E., re:
Ground Water Remediation - Vega Alta, Ponderosa
Well & Sam Cash & Carry, November 6, 1992 (5)
Letter to  Mr. F. Rene Garcia- Ramirez, Chief
Engineer,  Jafer Construction, S.E., from Mr. Ivan
Usero Perez, Geotechnical Engineer, GeoPractica,
Inc., re:  Pozos Ponderosa, November 24,1992 (6)
Ponderosa  Well data (7) Letter to Mr. Carl E.  .
Petrus, Project Manager, Environmental Resources
Management, Inc., from Jafer Construction, S.E.,
re: Ground Water Treatment Facilities, Vega Alta,
Puerto Rico, January 11,.1993 (7) Jose A. .Torres
Ramos corporate resume.)               •

Letter of  Transmittal to Mr. F. Rene Garcia,
Project Manager, Jafer Construction S.E., from Mr.
carl E. Petrus, P.E., Project Manager,
Environmental Resources Management, Inc.> re:
attached Initial Progress Schedule -Bar Chart,
Initial Progress Schedule - Classic Report, and •
Schedule of Values (Estimate Breakdown), January
13, 1993.  (Attachments.) (Note: This document is
CONFIDENTIAL.  It is located at the U.S. EPA
Superfund  Records Center, 290 Broadway, 18th
floor, New York, N.Y. 10007.)

Report:    December 1992 Progress Report for the
Vega^ Alta  Well Field Site, Puerto Ricor prepared
for Vega Alta Project Manager, Site Compliance
Branch, Emergency and Remedial Response Division,
U.S. EPA,  Region II, prepared by Ms. Susan T.
                           12

-------
          Barry, Project Manager/ Environmental Resources
          Management, Inc., January 19,  1993.   (Attachments:
          Appendices A-B.)
102228-   Report:   January 1993 Progress Report for
102230    Vega Alta Well Field Site. Puerto Rico^ prepared
          for Vega Alta Project Manager,  Site Compliance
          Branch, Emergency and Remedial  Response Division,
          U.S. EPA, Region II, prepared by Ms. Susan T.
          Barry, Project Manager, Environmental Resources
          Management, Inc., February 17,  1993.

102231-  .Report:   February 1993 Progress Report for the
102232  '•• Vega Alta Well Field Site. Puerto Rico, prepared
          for Vega Alta Project Manager,  Site Compliance
          Branch, Emergency and Remedial  Response Division,
          U.S. EPA, Region II, prepared by Ms. Susan T.
          Barry, Project Manager, Environmental Resources
          Management, Inc., March 29, 1993.

102233-   Facsimile to Mr. Jose Font, Project Manager,
102234    Caribbean Field Office, U.S. EPA, Region II, from
          Mr. Carl E. Petrus, P.E., Project Manager,
          Environmental Resources Management, Inc. ,  re: Vega
          Alta Remediation Construction Schedule, March 31,
          1993.  (Attachment: Letter to Mr. Jose Font,
          Project Manager, Caribbean Field Office, U.S. EPA,
          Region II, from Mr. Carl E. Petrus, P.E.,  Project
          Manager, Environmental Resources Management, Inc;,
          re: Vega Alta Remediation Construction Schedule,
          March 31, 1993.)

102235-   Letter to Mr. F. Rene Garcia, Project Manager,
102235    Jafer Construction S.E., from Yaron M..
          Sternberg, Ph.D., Principal, re: Vega Alta
          Remediation Project, April 20,  1993.

102236-   Letter to Mr. Jose Font, Project Manager,
102238    Caribbean Field Office, U.S. EPA, Region II, from
          Ms. Susan T. Barry, Project Manager, Environmental
          Resources Management, Inc., re: Vega Alta
          Superfund Site-Confirm cancellation of April. 1993
          ground water sampling, April 23, 1993.

102239-   Letter to Lourdes Rodriguez, Esquire,
102241    Assistant to the Governor, Office of the Governor,
          from Mr. George Pavlou, Acting Director, Emergency
          and Remedial Response Division, U.S. EPA,  Region
          II , re:  Vega Alta and Upjohn Superfund Sites, May
          7, 1993.
                           .13

-------
P.   102242-   Letter to Mr. Jose Font,' Project Manager/
     102243    Caribbean Field Office, U.S. EPA, Region II, from
               Mr. Carl E, Petrus, P.E., Project Manager,
               Environmental Resources Management, Inc., re:
               initial mechanical checkout schedule of the
               Ponderosa Remediation System, June 3, 1993.

P.   102244-   Letter to Mr. Jose Font, Project Manager,
     102246    Caribbean Field Office, U.S. EPA, Region II, from
               Mr. Carl E. Petrus, F.E., Project Manager,
               Environmental Resources Management,.Inc., re:
               attached copy of the Procedure Outline, Mechanical
               Checkout, Ponderosa Air Stripper, Vega Alta
               Remediation, June 9,.1993.  (Attachment.)

P.   102247-   Letter to Mr. Jose Font, Project Manager,
     102257    Caribbean Field Office, U.S. EPA, Region II, from
               Mr. Carl E. Petrus, P.E., Project Manager,
               Environmental Resources Management, Inc., re:
               reasons for delays incurred by the Contractor in
               arriving at Substantial Completion of the
               Ponderosa Remediation System, June 18, 1993.
               (Attachments: (1) Letter to Mr. Carl E. Petrus,
               P.E., Project Manager, Environmental Resources
               Management, Inc., from Mr. F. Rene Garcia, .Project
               Manager, Jafer Construction, S.E., re: Ground
               Water Treatment Facilities, Vega Alta, Puerto
               Rico, June 2, 1993 (2) Certificacion de
               Instalacion Electrica, undated (3)-Letter to
               Autoridad de Energia Electrica de PR, Oficiria de
               Inspecion, Area de Bayamon, from Ing. Manuel
               -Expos ito,.CPM,-re:~Subestacion-Electrica.de
               "Ponderosa Well"Ground Water Remediation",  (in
               Spanish),, May 11, -1995 (4) Letter to A.R.P.E.,
               from Enrique Morales Roldan, Superintendent^ de
               Inspecciones, Autoridad de Energia Electrica de
               Puerto Rico, re: E-93-IV-06, AB-199-IV-93, (in
               Spanish), May 24, 1993 (5) Puerto Rico Electric
               Power Authority Electric Service Contract Bond
               prepared for Jafer Construction,  (bilingual:
               Spanish and english),  May 21, 1993.)

P.   102258-   Letter of Transmittal to Mr. Jose Font, Project
     102277    Manager, Caribbean Field Office,  U.S. EPA, Region
               II, from Mr. Carl E. Petrus, P.E., Project
               Manager, Environmental Resources Management, Inc.,
               re: attached Operations Report for Mechanical
               Checkout of Ponderosa Remediation System. Vega  •
               Altaf Puerto Rico, prepared by Environmental
               Resources Management,  Inc., July 7, 1993, July 8,
              . 1993. (Attachment.)
                                14

-------
p.
102278-
102281
     102282-
     102282
     102283-
     102284
P.
102285-
102298
P.
102299-
102301
P.
102302-
102303
P.   102304-
     102305
 Facsimile to Mr.  Jose Font,  Project Manager,
 Caribbean Field Office,  U.S.  EPA,  Region II, from
 Mr.  Carl E.  Petrus,  P.E.,  Project Manager,
 Environmental Resources  Management, Inc.,  re: Vega
.Alta Remediation Final Completion,  July 16,  1993.
 (Attachment: Letter to Mr. Carl E.  Petrus, Project
 Manager, Environmental Resources Management, Inc.,
 from Mr. F.  Rene Garcia,  Project Manager,  Jafer
 Construction, S.E.,  re:  Ground Water Treatment
 Facilities,  July 14,  1994.)

 Letter to Lourdes Rodriguez,  Esquire,
 Assistant to the Governor, Office of the Governor,
 from Mr. George Pavlou,  Acting Director, Emergency
 and  Remedial Response Division,  U.S. EPA,  Region
 II,-  re:  Vega Alta Public Supply Wells Superfund
 Site,  July 16,  199.3.

 Report:    April.  May. June 1993 Progress Report
 for  the Vega Alta Well Field  Site.  Puerto Ricof
 prepared for Vega Alta Project Manager,  Site
 Compliance Branch,  Emergency  and Remedial Response
 Division,  U.S.  EPA,- Region II,  prepared by Ms.
 Susan T. Barry,  Project  Manager, Environmental
 Resources Management, Inc., July 19, 1993.

 Letter to Mr. Jose Font,  Project Manager,
 Caribbean Field Office,  U.S.  EPA,  Region II, from
 Mr.  Carl E.  Petrus,  P.E.,  Project Manager,
 Environmental Resources  Management, Inc.,  re:
 attached Vega Alta Remediation Analytical Results,
 July 27,1993.   (Attachments.)  .-

 Letter to Mr. F.  Rene Garcia,  Project Manager,
 Jafer Construction,  S.E.,  from Mr.  Carl E. Petrus,
 P.E.,  Project Manager, Environmental Resources
 Management,  Inc.,  re: Vega Alta Remediation Final
Completion Inspection, August 2, 1993.

 Report:    July and August 1993 Progress Report
 for  the Vega Alta Well Field  Site.  Puerto Rico.
 prepared for Vega Alta Project Manager,  Site
 Compliance Branch,  Emergency  and Remedial Response
 Division,  U.S.  EPA,  Region II,  prepared by Ms.
 Susan T. Barry,  Project  Manager, Environmental
 Resources Management, Inc., September 2, 1993.

 Letter to Ms. Aida Casanova,  Director, Scientist
 Assessment Office,  Environmental Quality Board,
 from Ms. Laura J.  Livingston,  Assistant Chief,
 Environmental Impacts Branch,  U.S.  EPA,  Region II,
                                15

-------
          re: Environmental assessment  (EA) for the.
          consolidation of manufacturing operations at the
          Vega Alta site, October 8, 1993.

102306-   Letter to Mr. Jose Font, Project Manager/
102330    Caribbean Field Office, U.S. EPA, Region II,.from
          Mr. Carl E. Petrus, F.E., Project Manager,
          Environmental Resources Management, Inc., re:
          attached plan: Initia^ Testing Program. Ponderosa
          Air Stripper Program,. Vega Alta. Puerto Ricof
          prepared for U.S. EPA, Region II, prepared by.
          Environmental Resources Management, Inc., October
          22, 1993. (Attachment.)

102331-   Report:   September 1993 Progress Report
102332    for the Veoa Alta Well Field Si-hef Puerto Ricor
          prepared for Vega Alta Project Manager, Site
          Compliance Branch, Emergency and Remedial Response
          Division, U.S. EPA, Region II, prepared by Ms.
          Susan T. Barry, Project Manager, Environmental
          Resources Management, Inc., November 1, 1993.

102333-   Letter to Mark E. Grummer, Esguire, Kirkland &
102334    Ellis, from Ms. Carol Petersen, New York/Caribbean
          Superfund Branch, U.S. EPA, Region II, re: EPA
          comments on the Revised Initial Testing Program,
          November 15, 1993.                    -

102335-   Report:   October 1993 Progress Report
102336    for the Vecra Alta Well Field Site. Puerto Rico.
          prepared for Vega Alta Project Manager, Site
          Compliance Branch, Emergency and Remedial .Response
         'Division, "U.'S. EPA,'Region II, prepared by Us.
          .Susan T. Barry, Project Manager, Environmental
          Resources Management, Inc., November 19, 1993.

102337-   Letter to Vega Alta Project Manager, Site
102342    Compliance Branch, Emergency and Remedial Response
          Division, U.S. EPA, Region II, from Ms.
          Susan T. Barry, Project Manager, Environmental
          Resources Management, Inc., re: Vega Alta November
          1993 Ground Water Sampling Event, Puerto Rico,
          November 19, 1993. (Attachments: (1) Letter to
          Vega Alta Project Manager, Site Compliance Branch,
          Emergency and Remedial Response Division, U.S.
          EPA, Region II, from Ms. Susan T. Barry, Project
          Manager, Environmental Resources Management, Inc.,
          re: Vega Alta November 1993 Ground Water Sampling
          Event, Puerto Rico,. November 19, 1993 (2) Report:
          October 1993 Progress Report for the Vega Alta
          Well Field Site.  Puerto Rico,  prepared for Vega
                           16

-------
p.
          Alta Project Manager, Site Compliance Branch,
          Emergency and Remedial Response Division, U.S.
          EPA, Region II, prepared by Ms. Susan T. Barry,
          Project Manager, Environmental Resources
          Management, Inc., November 19, 1993.

102343-   Memorandum to Mr. Jose Font, Project Manager, :
102386    Caribbean Field Office, U.S. EPA, Region II, from
          Mr. Carl E. Petrus, P.E., Project Manager,
          Environmental Resources Management, Inc., re:
          Enclosed analytical results, Vega Alta ITP,
          December 8, -1993.  (Attachment.)

102387-   Letter to Mr. Jose Font, Project Manager,
102388    Caribbean Field Office, U.S. EPA, Region II, from
          Mr. Carl E. Petrus, F.E., Project Manager,
          Environmental Resources Management, Inc., re: Vega
          Alta Remediation ITP Report, January 18, 1994.

102389-   Report:   November and December 1993 Progress
102391    Report Veaa Alta Well Field Site. Puerto Rico -
          Public Supply Case, prepared for Vega Alta Project
          Manager, Site Compliance Branch, Emergency and
          Remedial Response Division, U.S..EPA, Region II,
          prepared by Ms. Susan T. Barry, Project Manager,
          Environmental Resources Management, Inc., January
          26, 1994.

102392-   Letter to Margaret N. Strand, Esquire, Eckert,
102397    Seamans, Cherin & Mellot, .from Mr. Alexander
          Schmandt, Assistant Region Counsel, U.S. EPA,
          'Region II, re: Vega ':Alta .Public Supply Wells
          Superfund Site, Vega Alta, Puerto Rico, February
          18, 1994.  (Attachment: Monte Rey Farm Document
          Request, February 1994,}                      .

102398-:   Report:   January 1994 Progress Report Vega Alta
102399    Well Field Site. Puerto Rico - Public Supply Case.
          prepared for Vega Alta Project Manager, Site
          Compliance Branch, Emergency and Remedial Response
          Division, U.S. EPA, Region II, prepared by Ms.
          Susan T. Barry, Project Manager, Environmental
          Resources Management, Inc., February 22, 1994.

102400-   Letter to Mr. Jose Font, Project Manager,
102403    Caribbean Field Office, U.S. EPA, Region II, from
          Ms. Susan T. Barry, Project Manager, Environmental
          Resources Management, Inc., re: Request for
          Modification of Disposal Procedures for the Purge
          Water contained from the Vega Alta Site, Puerto
          Rico, February 23, 1994.  (Attachments:  (l) PRASA
                                17

-------
               Bulk Discharge Permit #GDG 90-708-057, Purge Water
               Analytical Results from December 1993 Sampling
               Event (2) Summary of recommended EPA action
               items.)

P.   102404-   Report:    Draft Initial Testing Program. Air
     102680    Stripper System. Ponderosa Well. Vega Alta
               Super fund _si t.ftj_ prepared for U.S. EPA, Region II,
               prepared by Environmental Resources Management,
               Inc., February 25, 1994.

P.   102681-   Report:    February 1994^ Progress Report Vega Alta
     102761    Well Field Site. Puerto Rico - Public Supply Case.
               prepared for Vega Alta Project Manager, Site
               Compliance Branch, Emergency and Remedial Response
               Division, U.S. EPA, Region II, prepared by Ms.
               Susan T. Barry, Project Manager, Environmental
               Resources Management, Inc., March 10, 1994.
               (Attachments: Appendices A-C.)

P.   102762-   Facsimile to Mr. Juan Fajardo, U.S. EPA, Region
     102762    II, from Mr. Jose Font, Project Manager, Caribbean
               Field Office, U.S. EFA, Region II, re: ^Letter to
               Mr. George Pavlou, Acting Director, Emergency and
               Remedial Response Division, from Mr. Hector Russe
               Martinez, Chairman, Puerto Rico Environmental
               Quality Board, re: "Draft  Explanation of
               Significant Differences (ESD) to the 1987 Record
               of Decision" and "Draft Remedial Design/Remedial
               Action (RD/RA) Statement of Work",  April 8,  1994.

               Letter to Mr. Jose Font, Project Manager,
               Caribbean Field Office, U.S. EPA, Region II, Ms.
               Charyl Fines, P.E., Work Assignment Manager, COM
               Federal  Programs Corporation, re: attached letter
               report "Evaluation of the  Potential Need"to
               Perform an Ecological Assessment, Vega Alta Site,
               Vega Alta, Puerto Rico", April 21,  1994.
               (Attachment.)

     102770-   Letter to Mr. Carl E. Petrus, P.E., Project .
     102772    Manager, Environmental Resources Management, Inc.,
               from Ms. Carole Petersen,  Chief, New
               York/Caribbean Superfund Branch, U.S. EPA, Region
               II, re:  Initial Testing Program Report, Vega Alta
               Public Supply Wells Site,  Vega Alta, Puerto Rico,
               May 18,  1994.

     102773-   Letter to Mr. Jose Font, Project Manager, U.S.
     102775    EPA, Region II, from Mr. Carl E. Petrus, P.E.,
               Project Manager, Environmental Resources
"P.   -102763-
     102769
                                18

-------
     102776
     102777
P.   102778-
     102779
P.   102780-
     102781
P.   102782-
     102782
P.   102783-
     102792
Management, Inc. /'.re: Vega Alta -Remediation, ITP  ,
Report, May 26, 1994. (Attachment: Letter to Vega
Alta Project Manager, Site Compliance Branch, -
Emergency Remedial Response Division, U.S. EPA,
Region II, from Ms. Susan T. Barry, Project
Manager, Environmental Resources Management, Inc.,
re: Vega Alta June 1994 Ground Water Sampling
Event, Puerto. Rico, June 17, 1994.)

Report:   March /Apr 11 /May 1994 Progress Report
Vega Alta Vtell Fi*>1d site. Puerto Rico - Public
Supply Casef prepared for Vega Alta Project
Manager, Site Compliance Branch, Emergency and
Remedial Response Division, U.S. EPA, Region II,
prepared by Ms. Susan T. Barry, Project Manager,
Environmental Resources Management, Inc., June 20,
1994.           :

Letter to Mr. Carl E. Petrus, P.E., Project
Manager, Environmental Resources Management, Inc.,
from Ms. Carole Petersen, Chief, New
York/ Caribbean Super fund Branch, U.S. EPA, Region
II, re: Start-Up Approval for the Ponderosa Well
Groundwater Treatment System, June 28, 1994.
(Attachment: Letter to Mr. Angus Macbeth, Esquire,
Sidley & Austin, from Mr. Paul Simon, Section
Chief, New York/ Caribbean Super fund Branch, U.S.
EPA, Region II, re: Administrative Order Index No.
II-CERCLA-90302; Start-Up Approval : for the
Ponderosa Well Groundwater Treatment System at the
Vega Alta Wellfield Site, July 8, 1994..}  -.

Report: .  June 1994 Progress Report Vega Alta Well
Field Site. Puerto Rico - Public Supply Caser
prepared for Vega Alta Project Manager, . Site   .  •
Compliance Branch, Emergency and Remedial Response
Division, U.S. EPA, Pegion II, prepared by Ms.
Susan T. Barry, Project Manager, Environmental
Resources Management, Inc., July 11, 1994.

Letter to Mr. Jose Font, Project Manager, U.S..
EPA, Region II, from Mr. Mark E. Grummer, Kirkland
& Ellis, re: Vega Alta CERCLA Site, August 5,
1994.
                                    t    -
Transmittal sheet to Mr. Jose Font, Project
Manager, Caribbean Field Office, U.S. EPA, Region
II, from CDM Federal Programs Corporation, .re:
attached TES V documents, July 14, 1994.
(Attachments:  (1) Letter to Mr. Erwin Smieszek, Tes
V Regional Project Officer, U.S. EPA, Region II,
                                19

-------
102793-
102796
102797-
102932
102933-
102933
102934-
102968
from Mr. Scott B. Graber, TES V Regional Manager,
CDM Federal Programs Corporation, re: Further
Review of Geraghty & Millers Modeling Effort,
Particularly their Response to CDMs Initial
Comments, January 19, 1993 (2)Letter to Mr. Jose
Font, Project Manager, Caribbean Field Office,
U.S. EPA, Region II, from Ms. Sally Odland, Work
Assignment Manager, CDM Federal Programs
Corporation, re: Memorandum Concerning CDMs
Further Review of Geraghty & Millers Modeling
Effort, Particularly their Responses to CDMs
Initial Comments, January 19, 1993 (3)Memorandura
to Mr. Jose Font and Ms. Bicky Coreman, U.S. EPA,
Region,II, from Mr. Fob Schreiber and Ms.
Bernadette Kolb, CDM; re: Vega Alta Site, Puerto
Rico, Further Review of Geraghty & Millers
Modeling Effort Particularly their Responses to
CDMs Initial Comments, January 19, 1992.)   (Note:
This document is CONFIDENTIAL.  It is located at
the U.S. EPA Superfund Records.Center, 290
Broadway, 18th floor, New .York, N.Y. 10007.)

Letter(to Mr. Jose Font, Project Manager,
Caribbean Field Office, U.S.  EPA, Region II, from
Mr. Rober J. Bauerle, P.E., Work Assignment
Manager, CDM Federal Programs Corporation,, re:
attached Final Inspection Field Report, September
9, 1994. fAttachment.)          .    .

Report:   July and August 1994 Progress Report
Veaa Alta Well Field Site. Puerto Rico - Public
Supply Case ? prepared • for -Vega -Al ta -Proj ect
Manager, Site Compliance Branch, Emergency and
Remedial Response Division, U.S. EPA, Region II,
prepared by Ms. Susan T. Barry, "Project Manager,
Environmental Resources Management, Inc.,
September 15, 1994.  (Attachments: Appendices A-
E.)

Letter to Vega Alta Project Manager, Site:.
Compliance Branch, Emergency and Remedial Response
Division, U.S. EPA, Region II, from Ms. Susan T.
Barry, Project Manager, Environmental Resources
Management, Inc., re: Vega Alta October 1994
Ground Hater Sampling Event,  Puerto Rico, October
5, 1994.
Report:   September/October 1994 Prpgress "Report
Vega Altia Well Field Site. Puerto Rico - Public
Supply Case, prepared for Vega Alta Project
Manager, Site Compliance Branch, Emergency and
                           20

-------
p.
          Remedial Response Division,  U.S.  EPA,  Region II,
          prepared by Ms. Susan T.  Barry, Project Manager,
          Environmental Resources Management,  Inc., November
          '22, 1994.  (Attachments:  Appendices A-B.)
    T -
102969-  . Report:   Npyember 1994 Progress Report Vega Alta
102970    Well Field Site. Puerto Rico - Public Supply Case,
          prepared for Vega Alta Project Manager, Site
          Compliance Branch, Emergency and Remedial Response
          Division, U.S. EPA, Region II, prepared by Ms.
          Susan T. Barry, Project Manager,  Environmental
          Resources Management, Inc.,  November 30, 1994.

102971-   Letter to Ms. Iris Cuadrado, Commonwealth of
102974    Puerto Rico Planning Board,  from Ms. Carole
          Petersen, Chief, New York/Caribbean Superfund
          Branch, U.S. EPA, Region II, re:  Environmental
          Impact Statement, Cowplejo Residencial, Comercjal,
          Comunidad Monterrey, Bo.  Espinosa, Vega Alta,
          Puerto Rico, December 9,  1994.

102975-   Facsimile transmittal to Mr. Jose Font, Project
102984    Manager, Caribbean Field Office,  U.S.  EPA, Region
          II, from Mr. James -Delaney,  Burns and Roe
          Industrial Services Company, re:  attached Draft
          Comments on RD Work Flan and Sampling Analysis and
          Monitoring Plan, Vega Alta,  Puerto Rico, January
          11, 1995. (Attachments.)

102985-   Letter to Ms. Alison Devine, Project Officer, U.S.
102996    EPA, Region II, from Mr.  Robert T. Goltz, P.E.,
          ARCS II Program Manager,  CDM Federal Programs
         "Corporation, "re: 'Document "Review -of • the -Remedial
          Design Work Plan and Sampling Analysis and
          Monitoring Plan for the Vega Alta Public Supply
         . Wells, February 9, 1995.  (Attachments: Letter to
          .Mr. Jose Font, Project Manager, Caribbean Field
          Office, U.S. EPA, Region II, from Mr.  Robert J.
          Baurerle, P.E., Work Assignment Manager, CDM
          Federal Programs Corporation, re: attached
          Document Review of the Remedial Design Work Plan
          and Sampling Analysis and Monitoring Plan for the
          Vega Alta Public Supply Wells, February 9, 1995.)
                                          /        ' • .
102997-   Report:   Analytical Results/Vega Alt:ar prepared
103106    for Mr. Joe Mohahan, Unisys Corporation, prepared
          by Ms. Karen R. Chirgwin, Laboratory Operations
          Director, Inchcape Testing Services, Aquatec
          Laboratories, March 28, 1995.
                                21

-------
P.   103107-   Report:   March  1995 Progress Report Vega Alta
     103108    Well Field site. Puerto Rico r prepared for Vega
               Alta Project Manager, Site Compliance Branch,
               Emergency and Remedial Response Division, U.S.
               EPA, Region II,  prepared by Messrs. David J.
               Martin, Environmental Project Manager, and Peter
               P. Mele, Program Manager, Unisys Corporation,
               April 10, 1995.      .            .

P.   103109-   Letter to Mr. Jose Font, Project Manger, U.S. EPA,
     103109    Region II, from  Mr. Hector Russe Martinez,
               Chairman, Commonwealth of Puerto Rico
               Environmental Quality Board, re: Sampling Analysis
               and Monitoring Plan & Supplemental Ground Water
               Remedial Design  Work Plan, Vega Alta Superfund
               Site, Vega Alta, Puerto Rico, April 10, 1995.

P.   103110-   Letter to Ms. Alison Devine, Regional Project
     103113    Officer, U.S. Environmental Protection Agency,
               Region II, from  Mr. Robert T. Goltz, P.E., ARCS II
               Program Manager, COM Federal Programs Corporation,
               re: Review of Supplemental Groundwater Remedial
               Design Work Plan and Sampling Analysis and
               Monitoring Plan, April 1995 Comments, May 23, .
               1995. (Attachment: Letter to Mr. Jose Font,
               Project Manager, Caribbean Field Office, U.S. EPA,
               Region II, from  Mr. Robert J. Bauerle, P.E., Work
               Assignment Manager, COM Federal Programs
               Corporation, re: attached Review of . Supplemental
               Groundwater Remedial Design Work Plan and Sampling
               Analysis and Monitoring Plan, April M995 Comments,
               May 23, 1995.)  .        .

               Letter to Messrs. Dave Thompson, General Electric
               Company, and Peter P. Mele, Unisys Corporation,
               from Ms. Carole  Peter sen, Chief, New
               York/ Caribbean Superfund Branch, U.S. EPA, Region
               II, re: Review of Supplemental Groundwater Design
               Work Plan (SGDWP) and Sampling Analysis and
               Monitoring Plan  (SAMP)  - April 1995 Comments, June
               9, 1995.         .                       .-

P.   103117-   Plan:     Supplemental Groundwater Remedial Design
     103168    W.01"k Plan, Vega Alfra Superfund SiteT Vega .Alta
              . Puerto Rico, prepared for U.S. EPA, prepared by
               Unisys Corporation, June 23, 1995.   /

P.   103169-   Report:   Field  Summary Report for September 1995.
     103184   .prepared by Ms. Chary 1 Fines, P.E., Work
               Assignment Manager, CDM Federal . Programs
               Corporation, prepared for Mr. Jose  Font, Project
P.   103114
     103116
                                22

-------
               Manager, Caribbean Field Office, U.S.-EPA, Region
               II, September 22, 1995.

P.   103185-   Report:   August 1995 OU I Progress Report. Vega
     1032
-------
p.
3003.82-
300538
300539
300610
300611
300856
               by Environmental Resources Management/ Inc. ,
               October 11, 1989.

               Plan: Field Sampling Plan Operable Unit Two
               fSource> an& Supplemental Ground-Water
               Investigations. Vega Alta . Puerto Rico, prepared
               for Caribe General Electric Products, Inc.,
               prepared by Geraghty & Miller, Inc., November
               Plan: Quality Assurance Project Plan Operable Unit
               Two  f Source) and Supplemental Ground-Water
               Investigations „_ Vega Alt&j Puerto Rico. .prepared
               for Caribe General Electric Products, Inc. ,
               prepared by Geraghty & Miller, Inc., November
               1991.

               Plan: Sampling Analysis and Monitoring Plan. Vega
               Alta Superfund Site. Vega Alta. Puerto Rico.
               prepared by Unisys, June 21, 1995.
3.2 Sampling and Analysis Data/Chain of Custody Forms

P.   300857- .•  Report: Response Actions Neededr  undated.
     300865

P.   300866-   Water Quality Data, undated.
     301008                          .             ,.

P.   301009-   Report: Analytical Data Report,  prepared for Mr.
     301066    Joe Fromal, Environmental Strategy Corporation,
               prepared by compuchem Laboratories, March 1, 1988.

P.   301067-   Report: The West Company,. Vega Alta. Puerto Rico.
     301565    Additional Soils Investigations.  Confidential,
               prepared for The West Company, prepared by
               Environmental Resources Management, Inc., July 8,
               1988.  (Note: This document is CONFIDENTIAL. It is
               located at U.S. EPA, Superfund Records Center,  290
               Broadway, 18th Floor, New York,  New York, 10007).

P.   301566-   Report: Analytical Quality Assurance Report.
     301580    Ground Water Samples Collected 22 October 1990
               through 24 Octpber 1990. Vega Alta Superfund Site.
               Vega Altaf Puerto Rico, prepared for Motorola,
               Inc., Harman Automotive, Inc. and The West Company
               of Puerto Rico, Inc., prepared by Environmental
               Resource Management, Inc., February 13, 1991,
               revised March 8, 1991.
                                24

-------
301581- ;  Fax to Mr. Jose Font/ from Messrs. Mike Reive and
301583    Brian Smith, re: G. L. Soil Boring Results,
         . December 12, 1992. (Attached: Analytical Results
          for BH-03 and BH-03A.)

301584-   Report: Analytical Quality Assurance Report,
301678    Unisys Corporation, Ground Water Samples Collected
          17 through 20 October 1994, Vega Alta Superfund
        -  Site, Vega Alta. Puerto Rico, prepared by
 .-  • '     Environmental Resources Management, Inc., January
      ".   3, 1995.     .      .

301679-.  Letter to Messrs. David W. Thompson, Manager,
302040    Mid-Atlantic/Southeast Region, General Electric
          Corporate Environmental Programs; and Peter Mele*
          Environmental Program Manager, Unisys Corporate
          Environmental Affairs, from Mr. David Andersen,
          Project Manager, Unisys, re: SAMP Activities,
          First Operable Unit,  Vega Alta Public Supply Wells
          Site, May 5/1995.  (Attached: '(1) Tables 1 - 3;
          (2) Figures 1 - 3; and (3) Attachments A and B.)
                                            +
302041-   Letter to Mr. Jose C. Font, Project Manager, U.S.
302114    EPA, from Messrs. David J. Martin/ Environmental
          Project Manager, Vega Alta Steering Committee and
          Mr. Peter P. Mele, Program Manager/ Unisys
          Corporation, Vega Alta Steering Committee, re:
          Vega Alta Well Field Site, Puerto Rico, Analysis
          of Inorganics in Ground Water, July 25, 1995.
          (Attached: (1) Report:  Data Validation for Veaa
          Alta Site. Vega Alta, Puerto Ricor Inorganic
         • Analysis-Data-. Total-and-Dissolved "Metals* in
          Water. Laboratory SPG No.  51472.' prepared for.
          Unisys Corporation/ prepared by Trillium, Inc.
          July 18, 1995 (Attachments A and B included);  (2)
          Report:  pata Validation for Vega Alta Sitef Vega
          Alta'f Puerto Ricof Inorganic Analysis Data f Total
          and Dissolved Metals in Water. Laboratory SDC No.
          5l4.96f prepared for Unisys Corporation, prepared
          by Trillium, Inc. July 19, 1995 (Attachments A and
          B included); and  (3)  Report:  Da£a Validation for
          Vega Alta Site. VegaMtaf Puerto Rico. Inorganic
          Analysis Data. Total and Dissolved Metals in
          Waterf Laboratory SPG No.  51719. prepared 'for
          Unisys Corporation, prepared by Trillium; Inc.
          July 19, 1995 (Attachments A and B included); and
          (4) Report:  Data Validation for Vega Alta Site.  .
          Vega Altar Puerto Rico, Inorganic Analysis Datat
          Total and Dissolved Antimony and Suspended Solids
          in Water,. .Laboratory SPG No. 52019,. prepared  for
                           25

-------
              . Unisys Corporation, prepared by Trillium, Inc.
               July 21, 1995 (Attachments A and.B included}).

P.   302115-   Report: Soil Vapor Extraction Performance TestJ
     302244    Results, Vega Alta Superfvmd Site, submitted to
               Vega Alta Steering Committee, prepared by
               Groundwater Technology, Inc.,February 1996.
3.3 Work Plans           .

P.   302245-   Report: Health.and Safety Plan, Operable Unit^Two
     302285    (Source) and Supplemental Ground-Mater
               Investigationsf Vega Alta. Puerto Rico, prepared
               for Caribe General Electric Products, Inc.,
               prepared by Geraghty & Miller, Inc., November
               1991.
3.4 Remedial Investigation Reports
     302286-
     302291
     302292-
     302341
     302342-
     302577
     302578-
     302766
          Report:  Hydrology and Effects of Development of
          the Water-Table Aquifer in the Vega Alta Ouad~
          ranglef Puerto RicQf prepared by Mr. Fernando
          Gomez-Gomez and Mr. Heriberto Torres-Sierra,  U.S.
          Geological Survey, Water Resources Investigations
          Report 87-4105, 1988.
          Report: Westbay Multipart Wells at the Veaa Alta
          Sitef Part I - Basis for Selection,, prepared by
          Beak Consultants Limited; prepared for General
          Electric company, March 1990.

          Report:   Final Work Plan, Vega 'Alta Site^
          Operable Unit Two (Source^ and Supplemental
          Groundvater Investiaationej prepared for U.S. EPA,
          Region II, prepared by Ebasco Services
          Incorporated, July 27, 1990

          Report: Vega Alta Project, Caribe GE Groundwater
          Investigation Report. Volume 1 of 5.' Chapters 1 —
          i, prepared for Caribe General Electric Products,
          Inc., prepared by Bechtel Environmental, Inc., in
          consultation with Beak Consultants Limited, and
          Environmental Solutions, Inc.,'November 1990.
302767-   Report:  Vega Alta Project,.
302978
                                                  GE Grndwater
               Investigation Report •,  Volume 2 of 5. Chapters 4 -
               £, prepared for Caribe General Electric Products,
               Inc., prepared by Bechtel Environmental, Inc, in
                                26

-------
     302979-
     303410
     303411-
     303767
     303768-
     304082
P.
304083-
304138
P.
304139-
304163
P.
     304164-
     304219
304220-
304251
               consultation with Beak Consultants Limited, and
               Environmental Solutions,  Inc.,  November 1990.
          Report:   Vega Alta Prcnect,  Appendices in Support
          of Caribe GE Groundwater Investigation Report.
          Volume 3 of 5. Appendices A - Ef  prepared for
          Caribe General Electric Products, Inc., prepared
          by Bechtel Environmental, Inc, in consultation
          with Beak Consultants Limited, and Environmental
          Solutions, Inc., November 1990.

          Report:   Vega Alta Project.  Appendices in Support
          of Caribe GE Groundwater Investigation Report.
          Volume 4 of 5. Appendix Ff prepared for
          Caribe General Electric Products, Inc., prepared
          by Bechtel Environmental, Inc, in consultation
          with Beak Consultants Limited, and Environmental
          Solutions, Inc., November 1990.
Report:  Vega Alta Project. Appendices in Support
of Caribe GE Groundwater Investigation Report.
Volume 5 of 5. Appendices G - Lr prepared for
Caribe General Electric Products, Inc., prepared
by Bechtel Environmental, Inc, in consultation
with Beak Consultants Limited, and Environmental
Solutions, Inc., November 1990.

Report: Caribe GE Groundvater Investigation
Report. Technical Summary, prepared.for Caribe
General Electric Products, Inc., prepared by
.Environmental Solutions,! Inc,./..in consultation
with Bechtel Environmental, Inc., and Beak
Consultants Limited, December 1990.   .

Report: Caribe GE Groundwater Investigation
Report. Executive Summary, prepared for Caribe
General Electric Products, Inc., prepared by
Environmental Solutions, Inc., in consultation
with Bechtel Environmental, Inc., and Beak
Consultants Limited, January 1991.

Report: poil Vapor Extraction Technologyf
Reference Handbook,, prepared by U.S. EPA, :
Superfund, February 1991.

Quick Reference Fact Sheet: Presumptive Remedies:
Policy and Procedures, prepared by U.S. EPA,
Office of Solid Waste Management, Office of
Emergency and Remedial Response Hazardous
Site Control Division 5203G, September
1993. Attached: Quick Reference Fact Sheet:
                                27

-------
               Presumptive Remedies: Site Characterization and  .
               Technology Selection for-CERCLA Sites, with
               Volatile Organic Compounds in Soils, prepared by
               U.S. EPA, Office of Solid Waste Management, Office
               of Emergency and Remedial Response Hazardous
               Site Control Division 5203G, September 1993.

     304252-   Report:   Operable Unit Two Remedial and
     304547    Supplemental Groundwater Investigation of the Vega
               Alta Superfund Site.' Vecra Altar Puerto Rico.
               Volume I of IVf  Chapters 1-8r  Tables, prepared for
               Caribe General Electric Products, Inc. and Unisys
               Corporation, prepared by Geraghty & Miller, Inc.,
               April 1995.                                   .

     304548-   Report:   Operable Unit TWO Remedial and
     304599    Supplemental Groundvafrer Investigation of the Vega
               Alt^ Superfund Site. Vega Altaf Puerto Rico.
               Volume IT of IV. Figures,, prepared for Caribe
               General Electric Products, Inc. and Unisys
               •Corporation, prepared by Geraghty & Miller, Inc.,
               April 1995.

     304600-   Report:   Operable Unit Two Remedial and
     304857    Supplemental Groundwater Investigation of the Vega
               Alta Super fund Site.. Vega Alta. Puerto Rico.  •
               Volume III of IVr  Appendices A-H, prepared for
               Caribe General Electric Products, Inc. and Unisys
               Corporation, prepared by Geraghty & Miller, Inc.,
               April 1995.

     304858-   Report: .  Operable Unit Two Remedial arid
     305332    Supplemental Groundwater Investigation of the-Vega
               Alta Superfund Sitef Vega Altaf Puerto Ricof
               Volume IV of JV, Appendices I-J. prepared for  :.
               Caribe General Electric Products, Inc. and Unisys
               Corporation, prepared by Geraghty & Miller, Inc.,
               April 1995.  ..-"•_..
3.5  Correspondence

P.   305333-   Letter to Mr. Lee M. Thomas, Assistant     -
     305339    Administrator, U.S. EPA, Region II, from  Mr. Gene
               A. Lucero, Director, Office of Waste Programs
               Enforcement, U.S. EPA, Region II, re:
               Authorization to Proceed with Remedial Planing
               Activities at the Vega Alta Site - ACTION
              .MEMORANDUM, September 19, 1983. (Attached: ACTION
               MEMORANDUM, Vega Alta Site, Vega Alta, Puerto
               Rico, undated; (1) Memorandum to Mr. Gene A.
                                28

-------
          Lucero, Director, Office of Waste Programs
          Enforcement,  (WH-527), U.S. EPA, Region II, from
          Mr. Kirk Sniff, Acting Associate Enforcement
          Counsel for Waste (LE-134S),  re: Authorization to
          Proceed with Remedial Investigation and
          Feasibility study at the Vega Alta Site, Vega
          Alta, Puerto Rico—ACTION MEMORANDUM, September
          15, 1983; (2) Memorandum to Mr. Gene A. Lucero,
          Director, Office of Waste Programs Enforcement,
          (WH-527), U.S. EPA, Region II, from Mr. William N.
          Hedeman, Jr., Director, Office of Emergency and
          Remedial Response (WF-527), re:  Authorization to
         ' Proceed with Remedial Investigation and
          Feasibility study at the Vega Alta Site, Vega
          Alta, Puerto Rico—ACTION MEMORANDUM, September
          15, 1983; (3) Letter to Mr. John Frisco, Chief,
          Hazard Assessment Section, U.S. EPA, Region II,
          from Kr. Francisco Gonzalez Quinohes, Deputy
          Executive Director, re: Deep Wells Contaminated
          with Volatile Organics in Vega Alta, June 24,
          1983.)

305340-   Letter to Bernice Gorman, Esquire, Office of
305371   .Regional Counsel, U.S. EPA, Region II, from Ms.
          Jennifer R. Clarke, Dechert,  Price & Rhoads, re:
          Vega. Alta Superfund Site, February 10, 1988.
          (Attachment: Analytical Quality Assurance Review,
          and various analytical and field, sampling methods
          prepared by ERM.)

305372-   Letter to Mr. Robert R. Williams, Chief, Public
•305373 	Water -Supply Section', • U;'S; EPA;' -Region- :1I,~ :from
          Mr. Allen L. Zack, Caribbean District Chief, U.S.
          Department of Interior, re: attached requested
          results for the "Puerto Rico  Islandwide Ground
          Water Volatile Synthetic Organic Chemicals",
          February 7, 1989.  (Attachment.)

305374-   Letter to Mr. Pedro A. Gelabert, Director,
305378    Caribbean Field Office, U.S.  EPA, Region II, from
          Mr. Joseph W. Troester, Hydrologist, Caribbean
          District, U.S. Department of Interior, re: Draft
          Work Plan for Second Operable Unit Remedial
          Investigation/Feasibility Study at the Vega Alta
          Public Supply Wells Site, Vega Alta, -Puerto Rico,
          May 25, 1989.  (Attachment: comments and
          recommendations.)

305379-   Letter to John Zackrison, Esquire, Kirkland &
305382    Ellis, from Ms. Carole Petersen, Chief, Hew
          York/Caribbean Compliance Branch, U.S. EPA, Region
                           29

-------
               II, re: Unilateral RC/RA Order  (Index No.  II-
               CERCLA-90302); Vega Alta Wellfield Superfund Site,
               Vega Alta, Puerto Rico; Motorola, Inc.,  et al.,
               September 26, 1989.

P.   3053^83-   Letter to John Zackrison, Esquire, Kirkland &
     305384    Ellis, form Ms. Carole Petersen, Chief,  New
               York/Caribbean Branch, U.S. EPA, Region
               II, re: comments on the October 10, 1989,  Revised
               Vega Alta Sampling Analysis and Monitoring Plan
               ("SAMP") submitted by Motorola, Inc., Harman
               Automotive, Inc., and West Company, November 27,
               1989.

P.   305385-   Letter to Mr. Jose C. Font, Caribbean Field
     305535    Office, U.S. EPA, Region II, from S. J.  Buckley,
               Project Manager, Bechtel Environmental,  Inc., re:
               enclosed Bechtel Job No. 20034-010, Vega Alta
               Project, TECHNICAL MEMORANDUM, February  26, 1990.
               (Attachment.)

P.   305536-   Letter to Mr. Jose C. Font, Vega Alta Project
     305537    Manager, Caribbean Field Office, U.S. EPA, Region
               II, from Mr. K. Berry-Spark, M.Sc., Contaminant
               Hydrogeologist, Beak Consultants Limited,  re:
               Westbay Multiport Wells at Vega Alta Site, Part I-
               Basis for Selection, April 30, 1990."

P.   305538-   Letter to Mr. Eduardo M. Negron Navas, Fiddler,
     305546    Gonzalez & Rodriguez, Attorney and Consellors at
               Law, from Messrs. Hector Fuentes, Alternate
               Member, Pedro A. Maldonado, Vice Chairman  and
               •Santos Rohena, 'Chairman,-Commonwealth -of -Puerto
               Rico/Office of the Governor, re: authorization to
               discharge purge water into Honda Creek in Vega
               Alta, May 9, 1990.  (Attachments: (1)  Table A-l
               "Effluent  Limitations and  Monitoring
               Requirements",  (2)  Facsimile to Ms. Susan Barry,
               Environmental Resources Management, Inc.,  from Mr.
               Eduardo Negron Navas, Fiddler, Gonzalez  &
               Rodriguez, re: EQBs Authorization, May 9,  1990,
               (3) Letter of Transmittal to Mr. Jose Font,
               Caribbean Field Office, U.S. EPA, Region II, from
               Ms. Susan T. Barry, Environmental Resources
               Management, Inc., re: Monthly Progress Report and
               EQB Permit, June 11, 1990.)

P.   305547-   Letter to Mr. Michael Siegel, U.S. EPA,  Region II,
     305549    from Mr. Eduardo L. Buso,  Assistant Secretary,  GE
               Puerto Rico Operation, re: NPDES Permit  No. PR
                                30

-------
               0000566, Caribe CE Controls, Vega Alta, PR,
               September 28, 1990.
                                      •' i         ,
P.   305550-   Letter to Bernice I. Gorman, Esquire,
     305551    Assistant Regional Counsel, U.S. EPA, Region II,
               and Messrs. Mel Hauptman,  Vega Alta Project
               Manager, U.S. EPA, Region II; Santos Rohena
               Betancourt, Jr., Chairman, Puerto Rico
               Environmental Quality Board? and Jose C. Font,
               Vega Alta Project Manager, Caribbean Field Office,
               U.S. EPA, Region II, from Mr. Kevin W. Holtzclaw,
               Project Coordinator, GE Corporate Environmental.
               Programs, re: Administrative order Index No. II-
               CERCLA-90301; Vega Alta Superfund Site, November
               17, 1990.
P.   305552-   Letter to Mr. Mel Hauptman, Vega Alta Project
     305554    Manager, Chief, New York/Caribbean Compliance
               Branch, U.S. EPA, Region II, from Mr. Kevin W.
               Holtzclaw, re: attached Monthly Progress Report
               for November, 1990, December 10, 1990.

P.   305555-   Letter to Mr. Frank C..Brock, Chief/Underground
     305556    injection Control 'Section, U.S. EPA, Region II, .
               from Mr. Miguel A. Rivera, Vice President for
               Development Branch, Commonwealth- of Puerto Rico,
               Puerto Rico Industrial Development Company, re:
               Closure Plan - Injection Well, Herman Automotive
               of P.R., Inc., Vega Alta, Puerto Rico, Project: S-
               1371-0-85, January 18, 1991.  ....-.--'

               Letter to Mr. "Michael "Siegel, "U.S.' EPA, Hegiori'II,
               from Mr. Nestor Marguez, Manager, Environmental,
               Health and Safety, GE Puerto Rico Operations, re:
               NPDES Permit No. PR0000566, Caribe General        .
               Electric Products, Inc., Vega Alta Controls, Vega
               Alta, Puerto Rico, January 22, 1991.  (Attachments:
               (1) Process Flow Diagram, Water and Wastewater
               Treatment, General Electric, Vega Alta, Puerto
               Rico (2) General Electric, Vega Alta, Puerto Rico,
               Wastewater Management Plan, Project Schedule, July
               17, 1990.)

P.   305562-   Letter to Mr. Frank C. Brock, Underground
     305565    Injection Control Section, U.S. EPA,-Region II,
               from Mr. Miguel A. Rivera Carrasquillo, Vice
               President for Development, Commonwealth of Puerto
               Rico, Puerto Rico Industrial Development Company,
              . re: Closure Plan - Injection Well, Harman
               Automotive of PR, Inc., Vega Alta, Puerto Rico,
P.   305557-
     305561
                                31

-------
p.
p.
          Project No., S-1371-0-85, April 4,' 1991.
          (Attachments:  (1) "Acknowledgement  of Receipt of
          Nonhazardous Waste",  reported by Ms.  Marta
          Hernandez, TSDF Chemist, November 8,- 1990 (2)
          Letter to Mr. Miguel A. Rivera, Vice President,
          Development Branch, Puerto Rico Industrial
          Company, from Mr. Frank C. Brock, Chief,       •• »
          Underground Injection Control Section, re: Soil
          Samples at Well Site, Harman Automotive, Inc.,  .
          Vega Alta, PR/ PRIDCO Project: S-1371-0-85,  March
          11, 1991.)

305566-   Letter to Mr. Mel Hauptman, Vega Alta Project
305568    Manager, Chief.,, New York/Caribbean Compliance
          Branch, U.S. EPA, Region II, from Mr. Kevin W.
          Holtzclaw, Manager, Remedial Projects, Mid-
          Atlantic Region, GE Corporate Environmental
          Programs, re: attached Monthly Progress Report for
          November 1991, December 10, 1991.

305569-   Letter to Ms. Sally Odland, Camp Dresser and
305571    McKee, Federal Programs Corp., from Messrs.  Brian
          Blum, Senior Scientist/Project Manager; Brian
          Smith, Senior Scientist; and Daniel Nachman, Vice
          President/Project Director, Geraghty & Miller,
          Inc., re: Ground-Water Sampling in the OUII
          Investigation Area, Vega Alta, Puerto Rico,
          December 17, 1991. (Attachment: Table 1. Wells
          Scheduled for Sampling at the OUII Investigation
          Area, Vega Alta, Puerto Rico, undated.) .-

         " Letter "to * Ms.'' Sally".Odland, "Camp"Dresser • arid
          McKee, Federal Programs Corp.,..from Messrs.  Brian
          Blum, Senior Hydrogeclogist/Project Manager and
          Daniel A. Nachman, Vice President/Project
          Director, Geraghty & Miller, Inc.,  re: Ground-
          Water Sampling in the OUII Investigation Area,
          Vega Alta, Puerto Rico, December 19,.1991.

305573-   Letter to Mr. Jose C. Font, Vega Alta Project
305574    Manager, Caribbean Field Office, U.S. EPA, Region
          II, from MS. Sally Odland, Work Assignment  •
          Manager, CDM Federal Programs Corporation,, re:
          Revision to Brossman Short Form Dated 11/19/91,
          December 31, 1991.

305575-   Letter to Mr. Mel Hauptman, Vega Alta Project
305577    Manager, Chief, New York/Caribbean Compliance
          Branch, U.S. EPA, Region II, from Mr. Kevin W.
          Holtzclaw, Manager, Remedial Projects, Mid-
          Atlantic Region, GE Corporate Environmental
P. 	305572-
     305572
                                32

-------
               Program^, re: attached Monthly Progress Report for
               December 1991, January 10, 1992.   .

P.   305578-   Letter to Mr. Jose Perez; Teledyne Packaging of
     305578    Puerto Rico, Inc., from Messrs. Brian A. Smith,
               Senior Scientist and Daniel A. Nachroan, Vice
               President/Project Director, Geraghty & Miller,
               Inc., re: Surveys to be conducted at the Teledyne
               Packaging grounds in Vega Alta in accordance with
               the Administrative Order (Index No. II-CERCLA-
               00301), February 13, 1992.

P.   305579-   Letter to Ms. Catherine E. Moyik, TES V Regional
     305595    Project Officer, U.S. EPA, Region II, from Mr.
               Scott B. Graber, TES V Regional Manager, re: Draft
               Summary Technical Review Report Concerning PRP
               Groundwater-Investigation Documents, DCN: TESV-
               C02081-LR-CKBG, March 2, 1992. (Attached: Draft,
               Summary Technical Review Report Concerning PRP
               Groundwater Investigatipn Documentsf Vega Alta
               Water Supply Well Site, Operable Unit IT. Vega
               Alta. Puerto Rlcof prepared for U.S. EPA, Region
               II, Office of Waste Programs Enforcement, prepared
               by CDM FPC, February 28, 1992.) (Note: This
               document is CONFIDENTIAL. It is located at U.S.
               EPA Superfund Records Center, 290 Broadway, 18th
               floor, N.V., N.Y. 10007-1866.)

P.   305596-   Letter to Mr. Mel Hauptman, Vega Alta Project
     305599    Manager, Chief, New York/Caribbean Compliance
               Branch, U.S. EPA, Region II, from Mr. Kevin W.
               Holtzclaw, Manager, Remedial Projects, Mid-
               Atlantic Region, GE Corporate Environmental
               Programs, re: attached Monthly Progress Report for
               February 1992, March 10, 1992.

P.   305600-   Letter to Mr. Jose Fcnt, Vega Alta Project
     305602    Manager, Caribbean Field Office, U.S. EPA, Region
               II, from Mr. Kevin W. Holtzclaw, Manager, Remedial
               Projects, Mid-Atlantic Region, GE Corporate
               Environmental Programs, re: Groundwater Flow and
               Transport Model, Vega Alta Site, Puerto Rico,
               April 10, 1992.  (Attachment: Letter to Mr.- Mel
               Hauptman, Vega Alta Project Manager, New
               York/Caribbean Compliance Branch, U.S. EPA, Region
               II, from Mr. David W. Thompson, Manager, Mid-
               Atlantic/Southeast Region, Environmental
               Remediation Programs, GE Company, re: Vega Alta
               Superfund Site, July 15, 1992.)
                                33

-------
305603-   Letter to Mr. Mel Hauptman,  Vega Alta Project
305619    Manager, Chief, .New York/Caribbean Compliance
          Branch, U.S. EPA, Region II, from Mr. Kevin W.
          Holtzclaw, Manager, Remedial Projects, Mid-
          Atlantic Region, GE Corporate Environmental
          Programs, re: attached Monthly Progress Report for
          March 1992, April 10, 1992.

305620-   Letter to Mr. Jose C. Font,  Vega Alta Project
305621    Manager, Caribbean Field Office, U.S. EPA, Region
          II, from MS. Sally Odland, Work Assignment
          Manager, CDM Federal Programs Corporation, re:
          Status of CLP Data, April 30, 1992.

305622-   Letter to Mr. Mel Hauptman,  Vega Alta Project .
305653    Manager, Chief, New York/Caribbean Compliance
          Branch, U.S. EPA, Region II, from Mr. Kevin W,
          Holtzclaw, .Manager, Remedial Projects, Mid-
          Atlantic Region, GE Corporate Environmental
          Programs, re: attached Monthly Progress Report for
          April 1992, May 10, 1992.

305654-   Letter to Mr. Mel Hauptman,  Vega Alta Project
305660    Manager, Chief, New York/Caribbean Compliance
          Branch, U.S. EPA, Region II, from Mr. Kevin W.
          Holtzclaw, Manager, Remedial Projects, Mid-
          Atlantic Region, GE Corporate Environmental
          Programs, re: Administrative Order Index No. II -
          CERCLA-00301: Approval of Transfer of Project
          Coordinator for Vega Alta Well Field, May 20,
          1992. (Attachments:  (1) Addressee list (2).
          'Corporate resume of David W. Thompson.)

305661-   Letter to Mr. Mel Hauptroan,  Vega Alta Project
305716    Manager, Chief, New York/Caribbean Compliance
          Branch, U.S. EPA, Region II, from Mr. Kevin W.
          Holtzclaw, Manager, Remedial Projects, Mid-
          Atlantic Region, GE Corporate Environmental
          Programs, re: attached Monthly Progress Report for
          May 1992, June 10, 1992.

305717-   Letter to Mr. Jose Fcnt, Vega Alta Project
305717    Manager, Caribbean Field Office, U.S. EPA, ..Region
          II, from Mr. Kevin W. Holtzclaw, Manager, Remedial
          Projects, Mid-Atlantic Region, GE Corporate
          Environmental Programs, re:  Vega Alta Supeffund
          Site, June 29, 1992.                     .

305717A-  Letter to Ms. Catherine E. Moyik, TES V Regional
305717K   Project Officer, U.S. EPA, Region II, from Mr.
          Scott B. Graber, TES V Regional Manager, re:
                           34

-------
          Meeting Notes - Geraghty and Miller Modeling
          Results from PRP Meeting Attended on June 23, DCN:
          TESV-C02081-LR-CMYN, July 1, 1992. (Attached:
          Confidential Memorandum Meeting Notes, Geraghty
          and Miller Groundwater Modeling Results/ June 23,
          1992, Vega Alta Water Supply Well Site, Operable
          Unit II, Vega Alta, Puerto Rico, prepared for U.S.
          EPA, Region II, Office of Waste Programs
          Enforcement, prepared by CDM FPC, July 1, 1992.)
          (Note: This document is CONFIDENTIAL.  It is
          located at U.S. EPA.Superfund Records Center, 290
          Broadway, 18th floor, N.Y., N.Y. 10007-1866.)

305718-   Letter to Mr. Mel Hauptman, Vega Alta Project
305720    Manager, Chief, New York/Caribbean Compliance
          Branch, U.S. EPA,'Region II, from Mr. David W.
          Thompson, Manager,  Remedial Projects, Mid-
          Atlantic/Southeast Region, GE Corporate
          Environmental Programs, re: attached Monthly
          Progress Report for June 1992, July 8, 1992.

305721-   Letter to Mr. Mel Hauptman, Vega Alta Project
305722A   Manager, Chief, New York/Caribbean Compliance
          Branch, U.S. EPA, Region II, from Mr. David W.
          Thompson, Manager,  Remedial Projects, Mid-
          Atlantic/Southeast Region, GE Corporate
          Environmental Programs, re: attached Monthly
          Progress Report for July 1992, August 6, 1992.

305723-   Letter to Mr. Jose Fcnt, Vega Alta Project
30,57.26	Manager.,..Caribbean .Field,.Office, .U.S... EPA", Region
          II, from Mr. David W. Thompson, Manager, Mid-
          Atlantic Southeast Region, Environmental
          Remediation Program, GE Company, re: submittal of .
          report entitled "Groundwater Flow and Transport
          Model of the Vega Alta Area, Vega Alta, Puerto
          Rico",  prepared by. Geraghty & Miller for GE,
          August 20, 1992. (Attachment: Distribution List.)

305727-   Letter to Ms. Catherine E. Moyik, TES V Regional
305733    Project Officer, U.S. EPA, Region II, from Mr.
          Scott B. Graber, TES V Regional Manager, re:
          Review of GEs Technical Memorandum - Summary of
          Field Activities for the Operable Unit Two
          Remedial Investigation, DCN: TESV-C02081-LR-CPHD,
          August 20, 1992. (Attached: Review of Caribe
          General Electric Products Report, Technical
          Memorandum Summary of Initial Field Activities for
          the Operable Unit Two, Remedial Investigation,
          Vega Alta, Puerto Rico, Dated July 1992, prepared
          for  U.S. EPA, Region II, Office of Waste Programs

-------
P.   305734-
     305736
P.   305737-
     305740
     305741-
     305746
     305747-
     305749
P.
305750-
305754
P.
305755-
305760
Enforcement, prepared by COM FPC, August 20,
1992.)

Letterito Mr. Mel Hauptman, Vega Alta Project
Manager, Chief, New York/Caribbean Compliance
Branch, U.S. EPA, Region II, from Mr. David w.
Thompson, Manager, Remedial Projects, Mid-
Atlantic/Southeast Region, GE Corporate
Environmental Programs, re: attached Monthly
Progress Report for August 1992, September 7,
1992.

Letter to Mr. David W. Thompson, Environmental
Remediation Program, General Electric Company,
from Ms. Carole Petersen, Chief,. New York/
Caribbean Superfund Branch II, U.S. EPA, Region
II, re:  Review of Caribe General Electric
Products Report, Technical Memorandum Summary of
Initial Field Activities for the Operable Unit
Two, Remedial Investigation, Vega Alta, Puerto
Rico, Dated July 1992, September 11, 1992.

Letter to Mr. Jose C. Font, U.S. EPA, Region II,
from Ms. Sally Odland, Work Assignment Manager,
CDM Federal Programs Corporation, re Review of.ERM
Comments on Caribe General Electric Products July
1992 Technical Memorandum, September 25, 1992.

Letter to Mr. Mel Hauptman, Vega Alta Project
Manager, Chief, New York/Caribbean Compliance
Branch, U.S. EPA, Region II, from Mr. David W.
Thompson, Manager, Remedial Projects, Mid-?,
Atlantic/Southeast Region, GE Corporate
Environmental Programs, re: attached Monthly
Progress Report for September 1992, October 8,
1992.

Letter to Ms. Carole Petersen, Chief, New
York/Caribbean Superfund Branch, U.S. EPA, Region
II, from Mr. David W. Thompson,  Manager, Remedial
Projects, Mid-Atlantic/Southeast Region, GE
Corporate Environmental Programs, re: attached
Geraghty & Miller letter re: Vega Alta, Puerto
Rico Public Supply Hell Field Site, Response to
ERM, Inc., Comments on OUII Technical Memorandum,
October 14, 1992. (Attachment.)

Letter to Ms. Carole Petersen, Chief, New
York/Caribbean Superfund Branch, U.S. EPA, Region
II, from Mr. David W. Thompson,  Manager, Remedial
Projects, Mid-Atlantic/Southeast Region, GE
                                36

-------
               Corporate Environmental Programs, re: attached
               Geraghty & Miller letter re: Vega Alta, Puerto
               Rico Public Supply Well Field Site, Response to
               U.S. EPA Comments on OUII Technical Memorandum,
               October 15, 1992. (Attachments)

P.   305761-   Letter to Jane W. Gardener, Esquire/ General
     305769    Electric Company, from Ms. Bernice I. Gorman, -
               Assistant Regional Counsel, U.S. EPA, Region II,
               re: Camp, Dresser & McKee Review of Geraghty &
               Miller Saltwater Intrusion Study, October 22,
               1992. (Attachment: Letter to Mr. Jose Font, Vega
               Alta Project Manager, Caribbean Field Office, U.S.
               EPA, Region II, from Ms." Sally Odland, Work
              .Assignment Manager, Camp, Dresser & McKee, Federal
               Programs Corp., re: CDM Comments on General
               Electrics Groundwater Modeling of the Vega Alta
               Area and Presented in their July 1992 Technical
               Memorandum and the September 29, 1992 Meeting at
               EPA, October 22, 1992.)

P.   305770-   Letter to Mr. Jose C. Font, U.S. EPA, Region II,
     305776    Caribbean Field Office, from Ms. Sally Odland,
               Work Assignment Manager, CDM Federal Programs
               Corporation, re:  CDM Comments on-General
               Electrics Groundwater Modeling of the Vega Alta
               Area as Presented in their July 1992 Technical
               Memorandum and September 29, 1992 Meeting at EPA,
               October 22, 1992.

P.   305777-   Letter to Mr. Erwin Stnieszek, TES .V Regional
   ....305785	Project, Officer, .U.S., EPA, ..Region .II, ..from.Mr.
               Scott B. Graber, TES V Regional Manager, CDM
               Federal Programs Corporation, re: attached CDM
               Comments on General Electrics Groundwater  .
               Modeling of the Vega Alta Area as Presented in.
               their1July 1992 Meeting at EPA, October 22, 1992.

P.   305786-   Letter to Mr. Jose Font, Vega Alta Project
     305786    Manager, Caribbean Field Office, U.S. EPA, Region
               II, from Messrs. Brian A. Smith, Senior
               Scientist/Project Manager and Daniel A. Nachman,
               Vice President/Project Director, Geraghty.6
               Miller, Inc., re: Sampling and Analysis for the
               Borehole investigation, Vega Alta Operable Unit
               II, October 30, 1992.

P.   305787-   Letter to Mr. Mel Hauptman, Vega Alta Project
     305789    Manager, Chief, New VorX/Caribbean Compliance
               Branch, U.S. EPA/ Region II, from Mr. David W.
               Thompson, Manager, Remedial Projects, Mid-Atlantic
                                37

-------
               Southeast Region, GE Corporate Environmental
               Programs,. re: attached Monthly Progress Report for
               October 1992, November 10, 1992.

P.   305T90-   Letter to Mr. Adalbert© Bosque, Acting Work
     305793    Assignment Manager,.from Ms. Sally Odland, Work
               Assignment Manager, CDM Federal Programs
               Corporation, re: Change in Location of Boring |36,
               November 10, 1992.         '

P.   305794-   Letter to Mr. Jose Font, Vega Alta Project
     305796    Manager, Caribbean Field Office, U.S. EPA, Region
               II, from Messrs. Brian A. Smith, Senior
               ^Scientist/Project Manager and Daniel A. Nachraan,
               Vice President/Project Director, Geraghty &
               Miller, Inc., re: Vega Alta OUII Borehole Drilling
               Investigation, November 19, 1992. {Attachments:
               data.)                           -  .

P.   305797-   Letter to Mr. Mel Hauptman, Vega Alta Project
     305798    Manager, Chief, New York/Caribbean Compliance
               Branch, U.S. EPA, Region II, from Mr. David W.
               Thompson, Manager, Remedial Projects, Mid-Atlantic
               Southeast Region, GE Corporate Environmental
               Programs, re: attached Monthly Progress Report for
               November 1992, December 10, 1992. .••

P. .  305799-   Letter to Mr. Erwin Smieszek, TES V Regional
     305806    Project Officer, U.S. EPA, Region II, from Mr.
               Scott B. Graber, TES V Regional Manager, re:
               Summary of Meetings in Puerto Rico on December 8,
               199-2 "Concerning -the GUI -.-Remedy; DCN: - TESV-C02 0 81-
               LR-CSRY, December. 22, 1992.  ...     .       .

P.   305807-   Letter to Mr. Mel Hauptman, Vega Alta Project    .  .
     305809    Manager, Chief, New York/Caribbean Compliance  :.•
               Branch, U.S. EPA, Region II, from Mr. David W.
               Thompson, Manager, Remedial Projects, Mid-
               Atlantic/Southeast Region, GE Corporate
               Environmental Programs, re: attached Monthly
               Progress Report for December 1992,  January 10,
               1993.                           .            :      .

P.   305810-   Letter to Mr. Jose Font, Vega Alta Project
     305819    Manager, Caribbean Field Office, u.Sf EPA, Region
               II, from Ms. Sally Odland, Work Assignment
               Manager, COM Federal Programs Corp., re: Change in
               Location of Boring 14, January 12,  1993.
               (Attachments: data.)
                                38

-------
p.
305820-
305831
     305832-
     305857
     305858-
     305870
P.
305871-
305902
     305903-
     305904
     305905-
     305916
Letter t6 Mr. Mel Hauptman, Vega Alta Project
Manager, Chief, New York/Caribbean.Compliance
Branch, U.S. EPA, Region II, .from Mr. David W.
Thompson, Manager, Remedial Projects, Mid-
Atlantic/Southeast Region, GE Corporate
Environmental Programs, re: attached Monthly
Progress Report for January 1993, February 10,
1993.

Letter to Mr. Mel Hauptman, Vega Alta Project
Manager, Chief, New York/Caribbean Compliance
Branch, U.S. EPA, Region II, from Mr. David W.
Thompson, Manager, Remedial Projects, Mid-
Atlantic/Southeast Region,-GE Corporate
Environmental Programs, re: attached Monthly
Progress Report for February 1993, March 9, 1993.

Letter to Mr. Jose Font, Vega Alta Project
Manager, Caribbean Field Office, U.S. EPA, Region
II, from Mr. David W. Thompson, Manager, Remedial
Projects, Mid-Atlantic/Southeast Region, GE
Corporate Environmental Programs, re: Additional
Work Under the Vega Alta OUII Remedial
Investigation, March 11, 1993.  (Attachments:
data.)

Letter to Mr. Ervin Smieszek, TES V Regional
Project Officer, U.S. EPA, Region II, from Mr.
Scott Graber, TES V Regional Manager, re: Summary
of Field Oversight Activities, March 16, 1993,
DCN: TESV-C02081-LR-CVRW, March  16.,: 1993. .. .
(Attached: Summary of Field Oversight Activities
March 1993, Vega Alta Water Supply Well Site,
Operable Unit II, Vega Alta, Puerto Rico, prepared
for U.S. Environmental Protection Agency, Office
of Waste Program Enforcement, prepared by CDM FPC,
March 16, 1993.)     -

Letter to Mr. Jose C. Font, U.S. EPA, Region II,
Caribbean Field Office, from Ms. Sally Odland,
Work Assignment Manager, CDM Federal Programs
Corporation, re: Locations of Proposed Additional
Multiport Wells, March 22, 1993.

Letter to Mr. Mel Hauptman, Vega Alta Project
Manager, Chief, New York/Caribbean Compliance
Branch, U.S. EPA, Region II, from Mr. David W.
Thompson, Manager, Remedial Projects, Mid-
Atlantic/Southeast Region, GE Corporate
Environmental Programs, re: attached Monthly
Progress Report  for March  1993,  April 8,  1993.
                                39

-------
305917-   Letter to Mr. Mel Hauptman, Vega Alta Project
305923    Manager, Chief, New York/Caribbean Compliance
          Branch, U.S. EPA, Region II, from Mr. David W.
          Thompson, Manager, Remedial Projects, Mid-
          Atlantic/Southeast Region, GE Corporate
          Environmental Programs, re: attached Monthly
          Progress Report for April 1993, May 4, 1993.

305924-   Letter to Mr. Jose C. Font, U.S. EPA, Region II,
305926    Caribbean Field Office, from Ms. Sally Odland,
          Work Assignment Manager, COM Federal Programs
          Corporation, re: Response to Questions Regarding
          the Chemical Fate of 1,1-Dichloroethene. and Freon,
          May 24, 1993. (Attached: References Cited.)

305927-   Letter to Mr. Mel Hauptman, Vega Alta Project
305928    Manager, Chief, New York/Caribbean Compliance
          Branch, U.S. EPA, Region II, from Mr. David W.
          Thompson, Manager, Remedial Projects, Mid-
          Atlantic/Southeast Region, GE Corporate
          Environmental Programs, re: attached Monthly
          Progress Report for May 1993, June 8, 1993.

305929-   Letter to Mr. Mel Hauptman, Vega Alta Project
305935    Manager, Chief, New York/Caribbean Compliance
          Branch, U.S. EPA, Region II, from Mr. David W.
          Thompson, Manager, Remedial Projects, Mid-
          Atlantic/Southeast Region, GE Corporate
          Environmental Programs, re: attached Monthly
          Progress Report for June 1993, July ,9, 1993.

-305936-  - Letter to-Ms.- Lourdes -Rodriguez> -Esquire,
305936  .  Assistant to the Governor, Office of the Governor,
          from Mr. George Pavlou, Acting Director, Emergency
          and Remedial Response Division, U.S. EPA, Region
          II, re: Vega Alta Public Supply Wells Superfund
          Site, July 16, 1993.

305937-   Letter to Mr. Mel Hauptman, Vega Alta Project
305939    Manager, Chief, New York/Caribbean Compliance
          Branch, U.S. EPA, Region II, from Mr. David W.
          Thompson, Manager, Remedial Projects, Mid-
          Atlantic/Southeast Region, GE corporate  .
          Environmental Programs, re: attached Monthly
          Progress Report for July 1993, August 9, 1993.

305940-   Letter to Mr. Mel Hauptman, Vega Alta Project
305942    Manager, Chief, New York/Caribbean Compliance
          Branch, U.S. EPA, Region II, from Mr. David W.
          Thompson, Manager, Remedial Projects, Mid-
          Atlantic/Southeast Region, GE Corporate
                           40

-------
          Environmental Programs,  re:  attached Monthly
          Progress Report for August 1993, September 9,
          1993.           ,  .  •

305943-   Letter to Mr. Mark E. Gruiruner,  Esquire, Kirkland &
305946    Ellis, from Ms. Carole Petersen, Chief, New
          York/Caribbean Superfund Branch, U.S. EPA, Region
          II, re: U.S. EPA comments on the Initial Testing
          Program (ITP) submitted by Environmental Resources
          Management, Inc., dated August 3, 1993, for the
          Vega Alta Superfund Site, October 1, 1993.

305947-   Letter to Mr. Mel Hauptman,  Vega Alta Project
305949    Manager, Chief, New York/Caribbean Compliance
          Branch, U.S. EPA, Region II, from Mr. David W.
          Thompson,  Manager, Remedial  Projects, Mid-
          Atlantic/Southeast Region, GE Corporate
          Environmental Programs,  re:  attached Monthly
          Progress Report for September 1993, October 7,
        .  1993.

305950-   Letter to Mr. Mel Hauptman,  Vega Alta Project
3059S7    Manager, Chief, New York/Caribbean Compliance
    :      Branch, U.S. EPA, Region II, from Mr. David W.
          Thompson,  Manager, Remedial  Projects, Mid-
          Atlantic/Southeast Region, GE Corporate
          Environmental Programs,  re:  attached Monthly
          Progress Report for October 1993, November 9,
          1993.                              ...

305988-   Letter to Mr. Mel Hauptman,  Vega Alta Project
305990    Manager, Chief, New .York/Caribbean Compliance
          Branch, U.S. EPA, Region II, from Mr. David W.
          Thompson,  Manager, Remedial  Projects, Mid-
          Atlantic/Southeast Region, GE Corporate
          Environmental Programs,  re:  attached Monthly
          Progress Report for November 1993, December 10,-
          1993.

305991-   Letter to Mr. Mel Hauptman,  Vega Alta Project
305993    Manager, Chief, New York/Caribbean Compliance
          Branch, U.S. EPA, Region II, from Mr. David W.
          Thompson,  Manager, Remedial  Projects, Mid-,
         , Atlantic/Southeast Region, GE Corporate
          Environmental Programs,  re:  attached,Monthly
          Progress Report for December 1993, January 10,
          1994.

305994-   Letter to Mr. Mel Hauptman,  Vega Alta Project
305996    Manager, Chief, New York/Caribbean compliance
          Branch, U.S. EPA, Region II,. from Mr. David W.
                           41

-------
305997-
306004
306004A-
306025
306026-
306028
306029-
306094
306095-
306097
 Thompson,  Manager,  Remedial  Projects,  Mid-
 Atlantic/Southeast  Region, .GE  Corporate
 Environmental  Programs,  re:  attached Monthly
 Progress Report for March  1994,  April  8,  1994.

 Letter to  Mr.  William  J. McCabe,  Deputy Director,
 Caribbean  Programs, U.S. EPA,  Region II,  and to
 Mr. Jose C.  Font, U.S. EPA,  Region  II,  Caribbean
 Field  Office,  from  Ms. Margaret  N.  Strand,  Eckert
 Seamans Cherin & Mellott,  re:  Vega  Alta Superfund
 Site,  Operable Unit II,  Comments on Report
 Submitted  by Caribe General  Electric and Unisys,
 May 23,  1994.

 Letter to  Mr.  David W. Thompson,  Manager,  Remedial
 Projects,  Mid-Atlantic/Southeast Region, .GE
 Corporate  Environmental  Programs, from Ms.  Carole
 Petersen,  Chief, New York/Caribbean Superfund
 Branch,  U.S. EPA, Region II, re:  EPA and the
 Commonwealth of Puerto Rico  Environmental Quality
 Board  comments on General  Electrics Operable Unit
 Two Remedial and Supplemental  Groundwater
 Investigation  Report of  the  Vega Alta  Superfund
 Site,  dated  January 1994,  May  25, 1994.
 (Attachment: references.)

 Letter to  Mr.  Mel Hauptman,  Vega Alta  Project
 Manager, Chief,  New York/Caribbean  Compliance
 Branch,  U.S. EPA, Region II, from Mr.  David w.
 Thompson,  Manager,  Remedial  Projects,  Mid-
 Atlantic/Southeast  Region, GE  Corporate  .
 Environmental  Programs,  re:  attached Monthly
"Progress 'Report for 'May' 19'94,' 'June '6,  1994.

 Letter to  Ms.  Carole Petersen, Chief,  New
 York/Caribbean Superfund Branch,  U.S.  EPA,  Region
 II, from Mr. David  W.  Thompson,  Manager,  Remedial
 Projects,  Mid-Atlantic/Southeast Region,- GE
 Corporate  Environmental  Programs, re:,  attached
 Response to  U.S. EPA Comments  on the Operable Unit
 Two Remedial and Supplemental  Groundwater,
 Investigation  Report,  June 30, 1994.
 (Attachment.)

 Letter to  Mr.  Mel Hauptaan,  Vega Alta  Project
 Manager, Chief,  New York/Caribbean  Compliance
 Branch,  U.S. EPA, Region II, from Mr.  David w.
 Thompson,  Manager,  Remedial  Projects,  Mid-
 Atlantic/Southeast  Region, GE  Corporate
 Environmental  Programs,  re:  attached Monthly
 Progress Report for June 1994, July 8,  1994.
                           42

-------
     306098-
     306100
     306101-
     306102
P.
306103-
306105
P.
306106-
306161
P.   306162-
     306164
P.   306165-
     306166
Letter to Mr.  Mel Hauptman, Vega Alta Project
Manager, Chief,  New York/Caribbean.Compliance
Branch, U.S. EPA, Region II, from Mr. David W.-
Thompson, Manager, Remedial Projects, Mid-
Atlantic/Southeast Region, GE Corporate .
Environmental  Programs, re: attached Monthly
Progress Report  for July 1994, August 9,  1994.

Letter to Mr.  Jose C. Font, U.S. EPA, Region II,
Caribbean Field  Office, from Mr. Hector Russe
Martinez, Chairman, Commonwealth of Puerto Rico,
Office of .the.  Governor, Environmental Quality
Board, Emergency Response and Superfund Area, re:
Response to U.S. EPA Comments, OU-II Remedial and
Supplemental Groundwater Investigation Report,
Vega Alta Superfund site, Vega Alta, Puerto Rico,
August 12, 1994.

Letter to Mr.  Mel Hauptman, Vega Alta Project
Manager, Chief,  New York/Caribbean Compliance
Branch, U.S. EPA, Region II, from Mr. David W.
Thompson, Manager, Remedial Projects, Mid-
Atlantic/Southeast Region, GE Corporate
Environmental  Programs, re: attached Monthly
Progress Report  for August 1994, September 9,
1994.

Letter to Mr.  Jose Font, Vega Alta Project
Manager, Caribbean Field Office, U.S. EPA, Region
II, from Mr. David W. Thompson, Manager,  Remedial
Projects, Mid-Atlantic/Southeast Region,  GE
"Corporate'' Environmental "Programs / re: - proper
discharge of purge water into the Ponderosa
Treatment System, September 27, 1994.  . '.
{Attachments:.various data and correspondence
relating to the  purge water discharge.)

Letter to Mr.  Mel Hauptman, Vega Alta Project
Manager, Chief,  New York/Caribbean Compliance
Branch, U.S. EPA, Region II, from Mr. David W.
Thompson, Manager, Remedial Projects, Mid-
Atlantic/Southeast Region, GE Corporate
Environmental  Programs, re: attached Monthly
Progress Report  for September 1994, October 6,
1994.

Facsimile to Mr." Jose Font, Vega Alta Project
Manager, Caribbean Field Office, U.S. EPA, Region
II, from Mr. David W. Thompson, Manager,  Remedial
Projects, Mid-Atlantic/Southeast Region,  GE
Corporate Environmental Programs, re: attached
                                43

-------
               letter to Mr. Dave Thompson, GE, from James S.
               Smith, Ph.D., President/ Chemist, Trillum Inc.,
               Environmental Consultants, re: Analytical
               Detection Limits, November 7, 1994.

P. -  306167-   Letter to Mr. Mel Hauptman, Vega Alta Project
     306169    Manager, Chief, New York/Caribbean Compliance
               Branch, U.S. EPA, Region II, from Mr. David W.
               Thompson, Manager, Remedial Projects, Mid-  .
               Atlantic/Southeast Region, GE Corporate
               Environmental Programs, re: attached Monthly
               Progress Report for October 1994, November 9,
               1994.

P.   306170-   Letter to Mr. Mel Hauptman, Vega Alta Project
     306172    Manager, Chief, New York/Caribbean Compliance
               Branch, U.S. EPA, Region II, from Mr. - David W.
               Thompson, Manager, Remedial Projects, Mid-
               Atlantic/Southeast Region, GE Corporate
               Environmental Programs,' re: attached Monthly
               Progress Report for November 1994, December 8,
               1994.  .           '   •

P.   306173-   Letter to Mr. Mel Hauptman, Vega Alta Project .
     306175    Manager, Chief, New York/ Caribbean Compliance
               Branch, U.S. EPA, Region II, from Mr. David W.
               Thompson, Manager, Remedial Projects, Mid-
               Atlantic/Southeast Region, GE Corporate
               Environmental Programs, re: attached Monthly
               Progress Report for December 1994, January 9,
              ..1995.               .    -   .       -       : .  -

P.   306176-   Letter to Mr. David W. Thompson, Manager, Remedial
     306212    Projects, Mid-Atlaritic/Southeast Region, GE
               Corporate Environmental Programs, from Ms. Carole
               Petersen, Chief, New York/ Caribbean Super fund
               Branch, U.S. EPA, Region II, re: U.S. EPA and the
               Commonwealth of Puerto Rico Environmental Quality
               Board evaluation of GEs and Unisys "Response to
               EPA Comments on the OU-II Remedial and   ' '
               Supplemental Groundwater Investigation Report,
               Vega Alta Super fund Site, Vega Alta, Puerto Rico",
               January 15, 1995.                         :

P.   306213-   Letter to Vega Alta Project Manager, 'Site .
     306217    Compliance Branch, Emergency and Remedial Response
               Division, U.S. Environmental .Protection Agency,
               from Mr. David J. Martin, Environmental Project
               Manager, Unisys Corporation, and Mr. Peter P.
               Mele, Program Manager, Unisys Corporation, re:
               December 1994 Progress Report, Vega Alta well
                                44

-------
306229-
306231
          Site, Puerto Rico, January 19, 1995. (Attached:
          (1) Letter to Chief, New York/Caribbean Compliance
          Branch, Emergency and Remedial Response Division,
          United States Protection Agency, from David. W.
          Thompson, GE Corporate Environmental Programs, re:
          Monthly Progress Report for December 1994, January
          19, 1995; (2) List of Addresses; (3) Monthly
          Progress Report, January 9, 1995.)

306218-   Letter to Mr. Jose Fcnt, Vega Alta Project
306228    Manager, Caribbean Field Office, U.S. EPA/
          Region II, from Mr. David W. Thompson, Manager,
          Remedial Projects, Mid-Atlantic/Southeast Region,
          GE Corporate Environmental Programs, re: attached
          GE/Unisys Response to USEPA Comment Letter of
          January 5, 1995, February 3, 1995.

          Letter to Mr. Mel Hauptman, Vega Alta Project
          Manager, Chief, New York/Caribbean Compliance
          Branch, U.S. EPA, Region II, from Mr. David W.
          Thompson, Manager, Remedial Projects, Mid-
          Atlantic/Southeast Region, GE Corporate
          Environmental Programs, re: attached Monthly
          Progress Report for January 1995, February 9,
          1995.

306232-   Letter to Vega Alta Project Manager, Site
306233    Compliance Branch, U.S. EPA, Region II, from
          Messrs. David J. Martin, Environmental Project
          Manager and Peter P. Mele, Program Manager, Unisys
          Corporation, re: January 1995 Progress Report,
          •Vega--Alta -Well- Field- Sitef Puerto Rico,- February
          13, 1995.

306234-   Facsimile transmission to Ms. Cheryl Fines, Camp,.
306269    Dresser & McKee, from Mr. Jose Font, Vega Alta
          Project Manager, Caribbean Field Office, U.S. EPA,
          Region II, re.: attached letter to Mr. David W.
          Thompson, Manager, Remedial Projects, Mid-
          Atlantic/Southeast Region, GE Corporate
          Environmental Programs, from Ms. Carole Petersen,
          Chief, New York/Caribbean Superfund Branch, U.S.
          EPA, Region II, re: U.S. EPA and the Commonwealth
          of Puerto Rico Environmental Quality Board'
          evaluation of GEs and Unisys "Response to EPA
          Comments on the OU-II Remedial and Supplemental
          Groundwater Investigation Report, Vega Alta
          Superfund Site, Vega Alta, Puerto Rico",  January
          15,  1995, February 14, 1994.
                           45

-------
p.
p.
306270- .  Letter to Vega Alta Project Manager, Site
306271    Compliance Branch, U.S. EPA, Region II, from
          Messrs. David J. Martin, Environmental Project
          Manager and Peter P. Mele,.Program Manager, Unisys
          Corporation, re: February 1995 Progress Report,
          Vega Alta Well Field Site, Puerto Rico, March
          10, 1995.

306272-   Facsimile to Mr. Jose Font, Vega Alta Project
306272    Manager, Caribbean Field Office, U.S. EPA, Region
          II, from Messrs. David J. Martin, Environmental
          Project Manager and Peter P. Mele, Program
          Manager, Unisys Corporation, re: Vega Alta Well
          Field Site, Puerto Rico, Ground-Water Sampling
          Notification, Second Quarter 1995, March 31, 1995.

306273-   Letter to Ms. Carol Fetersen, Chief, New York/
306290    Caribbean Superfund Branch II, U.S. EPA, Region
          II, from Mr. Peter P. Mele, Program Manager,
          Corporate Environmental Affairs, Unisys, re:Vega
          Alta Supplemental Groundwater Remedial Design .Work
          Plan (SRDWPJ and Supplemental Sampling Analysis
          and Monitoring Plan (SSAMP), April 6, 1995.
          (Attached: Response to U.S. EPA Comments on the
          SRDWP and SAMP Submission, Vega Alta Public
          Superfund Site, Vega Alta, Puerto Rico, April
          1995.)

          Facsimile to Mr. Jose Font, Vega Alta Project
          Manager, Caribbean Field Office, U.S. EPA, Region
          II, from Messrs. David J.. Martin, Environmental
         " Project Manager arid-Peter P. 'Mele, Program
          Manager, Unisys Corporation, re: Vega Alta Well
          Field Site, Puerto Rico, Ground-Water Sampling
          Notification, Second Quarter 1995, April 10, 1995.
          (Attachment: data.)

306293-   Letter to Mr. Jose C. Font, U.S. EPA, Region II,
306295    Caribbean Field Office, from Mr. Emilio
          Concepcion, Plant Manager, Caribe GE, re:  closure
          of unused ground water well, May 10, 1995.

306296-   Letter to Vega Alta Project Manager, Site •
306298    Compliance Branch, U.S. EPA, Region II, from
          Messrs. David J. Martin, Environmental Project
          Manager .and Peter P. Mele, Program Manager, Unisys
          Corporation, re: April 1995 Progress Report,
          Vega Alta Well Field Site, Puerto Rico, May
          15f- 1995.
P.   306291-
     306292
                                46

-------
P.   306299-'  Letter to Mr. Jose C. Font, U.S. EPA, Region II,
     306302    Caribbean Field Office, from Mr. David J. Martin,
               Environmental Project Manager, Unisys Corporation,
               and Mr. Peter P. Mele, Program Manager, Unisys
               Corporation, re: Vega Alta Field Site, Puerto
               Rico, Analysis of Inorganics in Ground Water, June
               14, 1995. (Attached: GE/Unisys Inorganic Sampling
               - May 1995,  Vega Alta, PR. Undated.)

P.   306303-   Facsimile to Mr. Jose Font, Vega Alta Project
     306309    Manager, Caribbean Field Office, U.S. EPA, Region
               II, from Mr. David S. Andersen, Project
               Manager/Geologist, Unisys Corporation, re: Vega
               Alta, Puerto Rico, SVE Perfomance Test, Operable
               Unit II, July 24, 1995. (Attachment: site location
               maps.)

P.   306310-   Letter to Mr. Jose C. Font, U.S. EPA, Region II,
     306311    Caribbean Field Office, from Mr. Joseph D.
               Monahan, Field Operations Manager, Unisys
               Corporation, re: Vega Alta Well Field Site, Puerto
               Rico, Ground Water Sampling Notification, Fourth-
               Quarter 1995, October 31, 1995.
4.0  FEASIBILITY STUDY

4.3  Feasibility Study Reports

P.   400001-   Letter to Mr. Jose Font, Project Manager,
     400066    Carribean Field Office, U.S. EPA, Region IJ, from
               Messrs. Peter P. Mele, Environmental Program
               Manager, Unisys Corporation, and David W.    .
               Thompson, Manager, Mid-Atlantic/Southeast Region,
               General Electric, re: Vega Alta Superfund Site,,
               Puerto Rico, Feasibility Study Report - Operable
               unit Two, Administrative Order II-CERCLA-00301,
               August 10, 1995.  "(Attached: Report: Operable Unit
               Two Feasibility Study_; Vgcra Alta Superfund Siter
               Vega Alta. Puerto Ricof prepared for U.S.. EPA on
               behalf of Caribe General electric and Unisys
               Corporation, prepared by Unisys Corporation,
               August 11, 1995.


4.6  Correspondence

P.   400067-   Letter to Mr. Mel Hauptman, Vega Alta Project
     400069    Manager, Chief, New York/Caribbean Compliance
               Branch, Emergency and Remedial Response Division,
               U.S. EPA, Region II, from Mr. David W. Thompson,


                                47

-------
p..
400073-
400075
               Manager, Mid-Atlantic/Southeast Region,
               Environmental Remediation Program, General
               Electric Corporate Environmental Programs, re:
               Attached Monthly Progress Report for January, 1994
               February 10, 1994.

P.   400070-   Letter to Mr. Mel Hauptman, Chief, New York/  .
     400072    Caribbean Compliance Branch/ Emergency and
               Remedial Response Division, from Mr. David W.
               Thompson, Manager, Mid-Atlantic/ Southeast Region,
               Environmental Remediation Program, General
               Electric .Corporate Environmental Programs, re:
               Attached Monthly Progress Report for February,
               1994, March 10, 1994.

               Letter to Mr. Mel Hauptman, Chief, New York/
               Caribbean Compliance Branch, Emergency and
               Remedial Response Division, from Mr. David W.
               Thompson, Manager, Mid-Atlantic/ Southeast Region,
              'Environmental Remediation Program, General
               Electric Corporate Environmental Programs, re:
               Attached Monthly Progress Report for April,
               1994, May 9, 1994. '

P.   400076-   Letter to Mr. Dave'Thompson, General Electric
     400084    Company, and Mr. Peter P. Mele, Anises
               Corporation/ from Ms. Carole Petersen, Chief, New
               York/Caribbean Superfund Branch II, U.S. EPA, re:
               Review of Draft Feasibility Study Report (FS)
               Operable Unit II, Vega Alta Public Water Supply
               Wells Site, Vega Alta, Puerto Rico, -July 24,
               1995. (Attached: Facsimile Journal, July 27,
               19951)        •'.'".'

P.   400085-   Letter to Mr. Mel Hauptman, Chief, New .York/
     400087    Caribbean Compliance Branch, Emergency and
               Remedial Response Division, from Mr. David W.
               Thompson, Manager> Mid-Atlantic/ Southeast Region,
               Environmental Remediation Program, General
               Electric Corporate Environmental Programs, re:
               Attached Monthly Progress Report for August 1995,
               September 9,1995.
5.0  RECORD OF DECISION

5.1  Record of Decision

P.   500001-   Record of Decision, Vega Alta Public Supply
     500082    Wells, Vega Alta, Puerto Rico, prepared by U.S.
               EPA, Region II, September 29, 1987.

-------
5.4  Correspondence

P.   500083-   Letter to Mr. Hector Russe, Esquire, Chairman,
     500086    Puerto .Rico Environmental Quality Board, from Mr.
               George Pavlou, Acting Director, Emergency and
               Remedial Response Division,,U.S. EPA, Region II,
               re: Implementation of the Operable Unit One ROD
               and Modifications to the Remedy that EPA is
               Contemplating, February 3, 1993.

P.   500087-   Memorandum to Ms. Jeanne M. Fox, Regional
  .   500091    Administrator, U.S. EPA, Region II, from Mr.
               Douglas R. Blazey, Regional Counsel, U.S. EPA,
               Region II, and Ms. Kathleen Callahan,-Director,
               Emergency and Remedial Response Division, U.S.
               EPA, Region II, re: Notice Required by CERCLA
               Section 117 (c) concerning Vega Alta Public Supply
               Wells Site, August 26, 1994.  (Attached: The U.S.
               EPA announces an Explanation of Significant
               Differences, Vega Alta Public Supply Wells Site,
               Vega Alta, Puerto Rico, undated.)
7.0 . ENFORCEMENT

7.1  Enforcement History

P.   700001-   Report: Environmental and PRP Status Review of
     700042    Teledyne Packaging Puerto Rico.  Inc. in Vega Alta.
               Puerto Rico, prepared by Environmental Strategies
               Corporation, January 25, 1988. (Note: This
               document is CONFIDENTIAL.  It is located at U.S.
               EPA, Superfund Records Center, 290 Broadway, 18th
               Floor, N.Y., N.Y. 10007)

P.   700043-   A List: Vega Alta Site Addresses, prepared by
     700046    unknown, prepared for unknown, July 30, 1992.


7.3  Administrative Orders

P.   700047-   Administrative Order, In the Matter of: Caribe
     700066    General Electric Products, Inc., Motorola Telcarro
               de Puerto Rico, Inc., Barman Automotive Puerto
               Rico, Inc., Puerto Rico Industrial Development
               Company, The West Company, Index No.-,II CERCLA-
               80217, September 30, 1988.
                          ' t     ,
P.   700067-   Administrative Order, In the Matter of: Caribe
     700086    General Electric Products, Inc., Motorola Telcarro
               de Puerto Rico, Inc., Harxnan Automotive Puerto


                                49

-------
               Rico,. Inc., Puerto Rico Industrial Development
               Company , The West Company, Index No. II-CERCLA-
               90302, March 22, 1989.

P.   700087-   Administrative Order, In the Matter of: Caribe
     700106    General Electric Products, Inc ., Motorola Telcarro
               ,de Puerto Rico, Inc. , Hannan Automotive Puerto
               Rico, Inc, , Puerto .Rico Industrial Development
               Company, The West Company, Teledyne Packaging,
               P.R., Inc., Index No. II-CERCLA-003 01, September
               27, 1990.

7.7  Notice Letters and Responses

P.   700107-   Notice Letter to Caribe General Electric,
     700108    Petitioner, from Mr. Pedro Maldonado Ojeda,
               President, Commonwealth of Puerto Rico, Office of
               the Governor, Environmental Quality .Board, re:
               Remedial Action, Vega Alta Wells, September 3,
               1992.

P    700109-   Questionnaire with responses by Mr. Philippe Guex
     700111    Tooling and Fastening Systems of America, Inc.,
               undated.

7 . 8  Correspondence
P.   700112
     700114
     700115
     700118
P.
     700119
     700120
               Letter to Mr. Gilberto Rivera, General Electric
               Controls, Vega Alta, Puerto Rico, from Mr. Conrad
               Simon, Director, Air and Waste Management
               Division, re: Notification to Terminate Interim
               Status -EPA I.D. No. :FRD090031410, October "3 / 1984.
               (Attachment: Notice of Interim Status
               Termination.)    -              -

               Letter to Mr. Christopher Daggett, Ph. D. ,
               Regional Administrator, -Environmental Protection
               Agency, Region II, from Mr. Santos Rohena
               Betancourt, Chairman, Estado Libre Asociado De
               Puerto Rico/Of icina De Gobernador, re: .US; -vs.
               Caribe General Electric Products et al Vega Alta
               Superfund Site, Vega Alta, Puerto Rico, June: 16,
               1988. (Attached:  Letter to Mr. Christopher
               Daggett, Ph. D., Regional Administrator,
               Environmental Protection Agency,  Region II, from
               Mr. Santos Rohena, Jr., Chairman, Commonwealth of
               Puerto Rico/Office of the Governor, re: Vega Alta
               Puerto Rico, Superfund Site, February 25, 1988.)

               Letter to Mr. Eric Schaaf , Chief, Superfund
               Enforcement Branch, Office of Regional Counsel,
                                50

-------
               U.S. EPA, Region II, Attn:  Ms. Bernice Gorman,
               Esq., from Mr. Santos Rohena,  Chairman,
               Commonwealth of Puerto Rico,  Office of the
               Governor, re: Vega Alta Wellfield Superfund Site,
               Puerto Rico, July 12, 1988.

P.   700121-   Letter to Mr. Santos Rohena Betancourt, Jr.,
     700121    Chairman, Environmental Quality Board, Santurce,
               Puerto Rico, from Mr. Stephen D. Luftig, Director,
               Emergency and Remedial Response Division, U.S.EPA
               Region II, re: Vega Alta Superfund Site, September
               21, 1988.

P.   700122-   Letter to various PRFs, from Mr. Eric Schaaf,
     700127    Chief, New York/ Caribbean Superfund Branch,
               Office of Regional Counsel, U.S.EPA Region II,
               re: Revised version of pages of Administrative
               Order II CERCLA-80217, October 3, 1988.

P.   700128-   Letter to Mr. Steve D. Ramsey, Sidley & Austin,
     700139    from Mr. Douglas B. MacDonald, Palmer & Dodge, and
               Ms. Encarnita Catalan Machan,  General Counsel,
               Puerto Rico Aqueduct Sewer Authority, re: Vega
               Alta Superfund Site, October 31, 1988.  (Attached:
               Distribution on Letter to Steve Ramsey dated
               October 31, 1988; Alternative Water Supply Fact
               Summary; Improvements to Water Supply System
               Construction of Distribution Tank, Installation of
               Transmission Mains and Connection of Deep Wells
               First Stage, Vega Alta, Puerto Rico - Cost
               Estimate, August 24, 1988.)

P.   700140-   Letter to Mr. Melvin Hauptman, Site Compliance
     700141    Branch, Emergency and Remedial Response Division,
               U.S. EPA, Region II, from Mr.  James J. Dragna,
               Pepper, Hamilton & Scheetz, re: Vega Alta Site,
               Vega Alta, Puerto Rico, Phase II Source Control
               RI/FS, November 2, 1988.

P.   700142-   Letter to Mr. William J. Muszynski, Acting
     700144    Regional Administrator, U.S. EPA, Region II, from
               Mr. Stephen D. Ramsey, Sidley & Austin, New York,
               re: Vega Alta, Puerto Rico Superfund Site,
               November 4, 1988.

P.   700145-   Letter to Mr. William J. Muszynski, Acting
     700255    Regional Administrator, U.S. EPA, Region II, from
               Mr. Stephen D. Ramsey, Sidley & Austin, New York,
               re:  Vega Alta, Puerto Rico Superfund Site,
               November 8, 1988.  (Attached:  (1) Comments of
               General Electric Company, Motorola, Inc., and
                                51

-------
               Harmon Automotive,; Inc., to Administrative Order
               Issued September 3'o, 1988 concerning the Vega Alta
               Superfund Site, prepared by General Electric
               Company, Motorola, Inc., Harmon Automotive, Inc.>
               November 8, 1988.  (2) Comments on the
               Administrative Order, dated September 30, 1988,
               Regarding The Vega Alta Superfund Site for General
              .Electric Company, prepared by Bechtel
               Environmental, Inc., Oak Ridge, Tennessee,
               November 2, 1988.  (3) Comments on Administrative
               Order Index No. II CERCLA-80217, by Edmund A.C.
               Crouch, Ph.D./ Debra A. Kaden, Ph.D., and Laura C.
               Green, Ph.D., Environmental Health and Toxicology
               Group, Meta Systems Inc., November 1, 1988.)

P.   700256-   Letter to Mr. William J. Muszynski, Acting
     700271    Regional Administrator, U.S. EPA, Region II, from
               Mr. George Miller, Dechert Price & Rhoads, re:
               Vega Alta Superfund Site, November 9, 1988.
               (Attached: Administrative Order, Index No. II
               CERCLA-80217, November 9, 1988.)

P.   700271A-  Letter to various PRFs, from. Mr. William J.
     700271A   Muszynski, Acting Regional Administrator, U.S.
               EPA, Region II, re: Suspension of the effective
               date of Administrative Order, November 23, 1988.

P.   700272-   Letter to Mr. William J. Muszynski, Acting
     700274   .Regional Administrator, U.S. EPA, Region II, from
               Mr. John A. 2ackrison, Counsel for Motorola, Inc.,
            •  --rev •• Vega 'Alta,- -Puerto -Rico- Superfund Site,
               November 23, 1988.

P.   700275-   Letter to Mr. William J. Muszynski, Acting
     700276    Regional Administrator, U.S. EPA, Region II, from
               Mr. David B. Parer, Farer Siegal Fersko, re:  Vega
               Alta, Puerto Rico Superfund Site, November
              • 28,1988.

P.   700277-   Letter to Mr. Santos Rohena Betancourt,
     700286    Chairman, Environmental Quality Board, Santurce,
               Puerto Rico, from Mr. Lee M. Thomas, U.S. .EPA,
               Region II, re: Vega Alta Superfund Site, Vega
               Alta, Puerto Rico, December 22, 1988, (Attached:
               Letter to Mr. James J. Florio, Chairman,
               Subcommittee on Commerce, Consumer Protection 'and
               Competitiveness, Committee on Energy and Commerce,
               House of Representatives, from Mr. Lee M. Thomas,
               U.S. EPA, Region .II, re: Agencys Implementation
               of the Superfund Amendments and Reauthorization
               Act of 1986  (SARA), May 20, 1987.)
                                52

-------
p.
p.
700287-
700289
700290-
700305
     700306-
     7003ZO
     700311-
     700311
     700312-
     700314
     700315-
     700350
P.   70-0351-
     700356
Letter to Mr. Douglas R. Blazey, Regional Counsel,
U.S. EPA, Region II, from Mr. Stephen D. Ramsey,
Sidley & Austin, re:  Vega Alta, Puerto Rico
Superfund Site, January 25, 1989.

Letter to various PRFs, from Mr. Stephen D.
Luftig, Director, Emergency and Remedial Response
Division, U.S. EPA, Region II, re: Unilateral
RD/RA Order  (Index No. II- CERCLA-90302), Vega
Alta Superfund Site, - March 23, 1989. ( Attached:
Letter to Mr. Santos Rohena Betancourt, Chairman,
Environmental Quality Board, Santurce, Puerto
Rico, from Mr. Lee M. Thomas, U.S. EPA, .Region II,
re: Vega Alta Superfund Site, Vega Alta, Puerto
Rico,.December 22, 1988).

Letter to Ms. Bernice Corman, Esq., Assistant
Regional Counsel, U.S. EPA, Region II, from Mr.
Stephen D. Ramsey, Sidley & Austin, re:  Vega
Alta, Puerto Rico Superfund Site, April 12, 1989.

Letter to Mr. John ZacJcrison, Esq., Kirkland &
Ellis, from Ms. Bernice Corman, Esq., Assistant
Regional Counsel, New York/Caribbean Superfund
Branch, U.S. EPA, Region II, re: Date of First
Deliverables Pursuant to Unilateral RD/RA Order
(Index.No. II- CERCLA-90302), Vega Alta Superfund
Site, April  19, 1989.

Letter .to Mr. John Malleck, .Chief U.I.C. ..Section
U.S. EPA, Region II, from Mr. Nicolas Suarez,
General Manager, Harrnan Automotive, Puerto Rico,
Inc., re: Harman Automotive - P.R., Inc., April
26, 1989. (Attached: A Partial Detail View of  .
PRIDCO, March 31, 1989.)

Letter to Mr. Eric Schaaf, Esq.,Office of Regional
Counsel, U.S. EPA, Region II, from Mr. Stephen D.
Ramsey, Sidley & Austin, re:  Vega Alta, Puerto
Rico Superfund Site, May 8, 1989.  (Attached:
Presentation to EPA, April 13, 1989, General
Electric Company, Vega Alta Superfund Site/ Vega
Alta, Puerto Rico.)

Letter to Ms. Bernice Corman, Office of  Regional
Counsel, U.S. EPA, Region.II, from Mr. John
Zackrison, Esq., Kirkland & Ellis, re: Vega Alta
Superfund Site, August 8, 1989.  (Attached: Letter
to various addressees, from Stephen P. Cline,
P.G., Project Manager, Environmental Resources
Management,  Inc., July 31, 1989.)
                                53 ,

-------
P.   700357-
     700358
     700359-
     700362
     700363-
     700365
     700366-
     700367
P.
700368-
700374
P.
700375-
700376
P.
700377-
700384
 Letter to  Mr.  Stephen  D. Ramsey, Sidley  & Austin,
 from Mr. George  Pavlou, Associate Director  for
 Enforcement Programs,  re:  Unilateral RD/RA Order
 (Index No.  II- CERCLA-90302), Vega Alta  Wellfield
 Superfund  Site,  Vega Alta, Puerto Rico,  Caribe
 General Electric Company, September 26,  1989.

 Letter to.Mr.  Eduardo  L. Buso, Esq., General
 Electric Company, Ric  Piedras, Puerto Rico,  from
 Mr. George A.  Shanahan, Assistant Regional
 Counsel,   U.S. EPA, Region II, re: EPA Order No.
 CWA-II-89-25,  Caribe GE Product, Vega Alta,  Puerto
 Rico, October  6,  1989.

 Letter to  various PRPs, from Mr. Stephen D.
 Luftig, Director, Emergency  and Remedial Response
 Division,  U.S. EPA Region II,  re: Vega  Alta
 Wellfield  Site,  RD/RA  Special Notice, November 20,
 1989.

 Letter to  Mr.  Stephen  D. Ramsey, Sidley  & Austin,
 from Mr. George  Pavlou, Associate Director  for
 Enforcement Programs,  U.S. EPA, Region II,   re:
 Caribe General Electric Products, Inc.,  Compliance
 with Unilateral  RD/RA  Order  (Index No. II-  CERCLA-
 90302) , Vega Alta Wellfield  Superfund Site,  Vega
 Alta, Puerto Rico, January 16, 1990.

 Letter to  Mr. Jose C.  Font,  U.S. EPA, Region II,
 Caribbean  Field  Office, and  Ms. Bernice  Gorman,
 U.S. EPA Region  II, from Mr. James J. Dragna,
.Pepper,- Hamilton .& .Scheetz,.  re: ...Vega,Alta.
 Wellfield  Superfund Site, Vega Alta, Puerto  Rico,
 March 14,  1990.

 Letter to  Ms. Susan Barry, Environmental Resource
 Management,  Inc.,-from Mr. Jose C. Font, Project
 Manager,   U.S. EPA, Region II, Caribbean Field
 Office, re:  Extension  for implementation of  the
 Vega Alta  Site SAMP pursuant to CERCLA
 Administrative Order 90302,  June 13, 1990.

 Letter to  Ms. Bernice  Gorman, Esq., U.S. EPA,
 Region II,  from Mr. George J. Miller, Dechert
 Price & Rhoads,  re: Vega Alta Superfund  Site, June
 20, 1990.  (Attached: Letter  to Mr. Eduardo M.
 Negron Navaz, Fiddler, Gonzalez & Rodriguez,
 Attorney and Councellors at  Lav, from Mr. Santos
 Rohena, Chairman,  .Commonwealth of Puerto Rico,
 Office of  the Governor, re:  Authorization for
                                54

-------
         .discharge of purge water, May 9, 1990; Table A-l,
          Effluent Limitations and Monitoring Requirements,
          undated.}

700385- .  Letter to Mr. Charles A. Bandoian, Project
700386    Director, Environmental Resource Management, Inc.,
          from Ms. Carole Peterson, Chief, New York/
          Caribbean Compliance Branch, U.S. EPA Region II,
          re: Draft SOW for Remedial Design for the Vega
          Alta Site, August 17, 1990.

700387-   Letter to Ms. Carole Peterson, Chief, New York/
700391    Caribbean Compliance Branch, U.S. EPA, Region II,
          from Mr. George J. Miller, Dechert Price & Rhodas,
          re: Vega Alta Superfund Site, August 31, 1990.
          (Attached: Letter to Ms. Ruth E. Baker, Vega Alta
          Project Manager, Environmental Resource
          Management, Inc., from Mr. Santos Rohena
          Betancourt, Chairman Commonwealth of Puerto Rico,
          Office of the Governor, Environmental Quality
          Board, re: Draft SOW for Remedial Design for the
          Vega Alta Wellfield Site, August 10, 1990.)

700392-   Letter with handwritten marginalia, to Ms. Bernice
700411    Gorman, Office of  Regional Counsel, U.S. EPA,
          Region II, from Mr. George J. Miller, Dechert
          Price & Rhoads, re: Administrative Order, U.S.
          EPA, Region II, Index No. II - CERCLA - 00301,
          dated September 27, 1990, October 24, 1990. (
          Attached: Letter with attachments to Mr. George J.
          Miller, Dechert Price & Rhoads, from Mr. Gerald L.
          •Kirkpatrick, • P; G., EFM «Proj ect • Manager ,• re: - The
          West Company of Puerto Rico, Inc., Vega Alta
          Superfund Site, EPA Index No. II-CERCLA 00301,
          October 23, 1990.)

700412-   Facsimile transmission of letter to Mr. Melvin
700417    Hauptman, Site Compliance Branch, Emergency and
          Remedial Response Division, U.S. EPA, Region II,
          from Mr. David B. Farer, Farer Siegal Fersko,
          Attorneys at Law, re:  Response to Administrative
          Order, October 22, 1990.

700418-   Letter to Mr. Jose c. Font, U.S. EPA, Region II,
700437    Caribbean Field Office, from Mr. Randall J.
          Krause, Pepper, Hamilton & Scheetz, re:  Vega Alta
          Wellfield Superfund Site, Vega Alta, Puerto Rico,
          October 29, 1990.  (Attached: Letter to Ms. Bernice
          Gorman, Esq., U.S. EFA, Region II, from Pepper,
          Hamilton & Scheetz, unsigned, re: Vega Alta,
          Puerto Rico Superfund Site, October 24, 1990.)
                           55

-------
700438-   Letter to Ms.' Bernice Corman, Esq, Office of
700439    Regional Counsel, ,U.S. EPA, Region II,•from Mr.
          David B. Farer, Farer Siegal Fersko, Attorneys at
          Law, re: ERM Report on Need for Treatability
          Study/ PRP Group Request for Extension of Time for
          Submission of Remedial Design/ Request for
          Meeting, March 5, 1991.

700440-   Letter to Mr. David B. Farer, Farer Siegal Fersko,
700442 ,   Attorneys at Law, from Ms. Carole Peterson, Chief,
          New York/ Caribbean Superfund Branch, Emergency
          and Remedial Response Division, re:  Vega Alta
          Superfund Site, First Operable Unit Administrative
          Order ( Index No. II - CERCLA - 90302),  May 09,
          1991.     '.'

700443-  .Letter to Ms. Bernice Gorman, Esq., U.S. EPA,
700444    Region II, from Mr. George J. Miller,. Dechert
          Price & Rhoads, re: Vega Alta Superfund Site, June
          21, 1991.

700445-   Letter to various PRPs from Ms. Carole Petersen,
700456    Chief, New York/ Caribbean Compliance Branch,
          Emergency and Remedial Response Division, U.S.
          EPA, Region II, re:  Unilateral RD/RA Order  (Index
          No. II- CERCLA-90302), Vega Alta Superfund Site,
          August 01, 1991.  (Attached: EPA Review of 30%
          Design Report, undated.)

700457-   Letter to Ms. Bernice Corman, Esquire, U.S. EPA.
700459    Region II, and Mr. Peter K. Kautsky, Esquire,
          "Environmental" Enf or ceme"nt~" Section, 'Environmental
          and Natural Resources Division, U.S. Department of
          Justice, from Mr. George J. Miller, Dechert Price
          & Rhoads, re^ United States v. GE Caribe, et al.,-
          Civil Action No. 90-2287  (cc), August-23, 1991.
          (Attached: Facsimile cover sheet, August 21,
          1991.)

700460-   Letter to Ms. Bernice Corman, Esq., Assistant
700461    Regional Counsel, New York/Caribbean Superfund
          Branch, U.S. EPA, Region II, from Ms. Peggy L. 0
          Brien, Siddley & Austin, re: Vega Alta Public
          Supply Wells Superfund Site, October 1,  1991.
                   '                           •*' ••*
700462-   Letter to Ms. Bernice Corman, Esq., Assistant
700463    Regional Counsel, New York/Caribbean Superfund
          Branch, U.S. EPA, Region II, from, Mr. Angus
          Macbeth,  Siddley & Austin, re: Vega Alta Public
          Supply Wells Superfund Site, November 27, 1991.
                           56

-------
P.   700464
     700468
     700469
     700473
P.
     700474
     700474
P.
     700475
     700487
P.
     700488
     700489
P.
     700490
     700492
 Letter to Ms.  Bernice  Gorman,  Esq.,  U.S.  EPA,
 Region II, from Mr.  George J.  Miller,  Dechert
 Price & Rhoads,  re:  Vega  Alta  Superfund site,
 January 15,  1992.  (Attached:   Letter to Mr.  George
 J.  Miller, Esq.,  Dechert  Price &  Rhoads,  from  Mr.
 Carl  E. Petrus,  P.E.,  Environmental  Resources
 Management,  Inc.,  re:  Vega Alta Site Remediation
 Construction Bidding Schedule, January 13,  1992.)

 Letter to various PRFs from Ms. Carole Petersen,
 Chief,  New York/ Caribbean Superfund Branch II ,
 Emergency and Remedial Response Division, 'U.S.
 EPA,  Region II,  re:  Vega  Alta  Superfund Site,  July
 10, 1992. (Attached: Facsimile cover sheet,
 September 21,  1992.)

 Letter to Ms.  Carole Petersen  Chief, New York/
 Caribbean Superfund  Branch II  , Emergency and
 Remedial Response Division, U.S.  EPA,  Region II,
 from  Ms. Nancy A.  Valley,  Motorola,  Inc., re:
 Attorney substitution, July 30, 1992

.Letter to Mr.  George J. Miller, Dechert Price  &
 Rhoads, from Ms.  Maria Luisa Gonzalez, Fiddler,
 Gonzalez & Rodriguez,  re:   Vega Alta Superfund
 Site, September 22,  1992.  (Attached: (1)
 Resolution (original and  unofficial  translation)
 addressed to various "PRPs, from Mr.  Santos Rohena
 Betancourt,  Department of Natural Resources,
 Puerto Rico, re:   Petition to  Waive  Franchise  to
 Operate de Ponderosa Well during  Remedial Action
 and "Cleaning "of 'Vega' Alta -Aquifer, • September- 23 ,
 1992; (2) Resolution written in Spanish,  re:
 Resolution waiving obtaining water extraction
 franchise, September 4, 1992.)

 Letter to Mr.  Jose C.  Font, U.S.  EPA,  Region II,
 Caribbean Field Office, from Mr.  George. J.  Miller,
 Dechert Price & Rhoads, re: Vega  Alta Superfund
 Site, November 13, 1992.  (Attached:  Notice to
 Jafer Construction,  S. E., from Mr.  George J.
 Miller, 'Attorney, The  West Company of Puerto Rico,
 Inc. , and Motorola Telcarro de Puerto Rico., Inc. ,
.re: Notification about Contract Time,  November 11,
 1992.) -.         .

 Letter to Ms. Lourdes  Rodriguez,  Assistant of  the
 Governor, Office of the Governor, San Juan, Puerto
 Rico, from Ms. Bernice Gorman, Esq., Assistant
                  57

-------
          Regional  Counsel, New York/Caribbean Superfund .
          Branch, U.S.  EPA, Region II, re: Vega Alta
          Superfund Site, April .8, 1993.

7004,93-   Letter/Translation to Mr. Juan F. Woodroffe,
700494    President,  PRIDCO, from Mr. Benjamin Pomales,
          Interim Executive Director, re: Vega Alta
          Superfund Site - U.S. vs. Caribe General Electric
          Products,  Inc., June 4, 1993.

700495-   Letter to Mr. Donald G. Frankel, Esq.,
700525    Environmental Enforcement Section, Environment and
          Natural Resources Division, United States
          Department of .Justice, from Mr. Langley R. Shook,
          Sidley &  Austin, re: United States v. Caribe
          General Electric Products, Inc., (Vega Alta
          Superfund Site), July 6, 1994. (Attached: (1) News
          Release from  The New fork Times, July 3, 1994; and
          (2) Memorandum in Support of Defendant Caribe
          General Electric's Motion to Suspend and Partially
          Vacate EPA's  Order, Craft, July 5, 1994.)

700526-   Letter to various PRFs from Mr. Juan M. Fajardo,
700550    Assistant Regional Counsel, Office of Regional
          Counsel,  U.S. EPA, Region II, re: Amendment to
          Administrative Order Index No. II- CERCLA-90302,
          Vega Alta Public Supply Wells Site, Vega Alta,
          Puerto Rico,  September 1, 1994. (Attached:
          Amendment to  Administrative Order Index No. II-
          CERCLA-90302, August 30, 1994, Appendix I and II
          included.)

700551-   Letter to Mr. Juan Fajardo, Office of .Regional
700552    Counsel, U.S. EPA, Region II, from Ms Margaret N.
          Strand, Bayh, Connaughton & Malone, P.G., re: .Vega
          Alta Superfund Site,  May 3,-1995.

700553-   Letter to Mr. Juan Fajardo, Office of Regional
700555    Counsel, U.S. EPA, Region II, from Ms. Margaret N.
          Strand, Eckert Seamans Cherin & Mellott, re: Vega
          Alta Superfund Site,  November 14, 1994. (Attached:
          Letter to Mr. Langley Shook,  Sidley & Austin, from
          Ms. Margaret N. Strand,  Eckert Seamans Cherin &
          Mellott,  re: Vega Alta Superfund Site, November
          14, 1994.)                      -

700556-   Letter to Mr. Juan Fajardo, Office of Regional
700569    Counsel, U.S. EPA, Region II, from Ms Margaret N.
          Strand, Bayh, Connaughton & Maione, P.G., re: Vega
          Alta Superfund Site:  Well A Plans And Sampling
          Plans, May  11, 1995.  (Attached: Comments on
                           58

-------
               GE/Unisys Plans for Well A and future sampling at
               Vega Alta Superfund Site.)

     700570-   Letter to Mr. Juan Fajardo, Office of Regional
     700577    Counsel, U.S. EPA, Region II,  and to Mr. Jose C.
               Font, U.S. EPA, Region II, Caribbean Field Office,
               from Ms Margaret ,N. Strand, Bayh, connaughton &
               Malone, P.G., re:  Vega Alta Superfund Site, June
               30,  3.995. (Attached: (1) Comments on Behalf of
               Monte Ray Farm and Enpresas Fonalledas on Draft
               Operable Unit II Feasibility Study, Vega Alta
               Superfund Site; (2) letter to Mr. Langley Shook,
               Sidley & Austin, from Ms. Margaret N. Strand,
               Bayh, Connaughton & Halone, P.G., re:  Vega Alta
               Superfund Site, June 30, 1995.)

     700578-   Letter to Mr. Jose C. Font, U.S.  EPA, Region II,
     700579    Caribbean Field Office, from Ms Margaret N.
               Strand, Bayh, Connaughton & Malone, P.G., re:
               Vega Alta Superfund Site, July 13, 1995.
8.0  HEALTH ASSESSMENT

8.1  Health Assessment

P.   800001—   Report: Final Human Health Risk Assessment, Vega
     800123    Alta Site. Vega Alta.  Puerto Rico. Volume I of IT.
               prepared  by COM Federal Programs Corporation,
               prepared -for-U»S.-EPA,  - Office-of Waste.Programs
               Enforcement, Washington, DC, December 7, 1995.

P.   800124-   Report: Final Human Health Risk Assessment. Vega
     800375    Alta Site. Veaa Alta.  Puerto Rico. Volume II of
               II, prepared by COM Federal Programs Corporation,
               prepared for U.S. UFA,   Office of Waste Programs
               Enforcement, Washington, DC, December 7, 1995.  .
10.0 PUBLIC PARTICIPATION
10.3  Public Notices
           i
P.   1000001-  Public Notice: "The United  States  Environmental
     1000002   Protection Agency  ("E?A") announces that it has
               ordered the performance of remedial design and
                                59

-------
               remedial action  (*RD/RA")at the Vega Alta
               Municipal Well Field Superfund site, located in
               Vega Alta, Puerto Rico (the "Site"), undated.
10.6  Fact Sheets and Press Releases

P.   1000003-  Fact Sheet for the Vega Alta .Public Well
     1000007   Field, September 1983. (Attached: (1) Memorandum
               to Ms. Jacqueline E. Schafer, Regional
               Administrator, from Mr. William J. Librizi,
               Director, Office of Emergency and & Remedial
               Response, U.S. EPA, Region II, re: Vega Alta
               Drinking Water Task Force Meeting, December 6,
               1983; (2) Fact Sheet, Vega Alta Public supply
               Wells, 12/06/96; (3) Letter to Mr. Jose M. Cobian,
               President, Industrial Development Co., from Mr.
               Weems L. Clevenger, Director, Caribbean Office,
               U.S. EPA, Region II, re: Request for assistance to
               identify past and present industrial activities..,
               June 28, 1983.)

P.   1000008-  Hoja de Informacion del Superfondo,  Vega Alta,
     1000010   Pozos de Suministro Publico, Vega Alta, Puerto
               Rico, Julio 95.(Note: This document is written in
               Spanish.)

P.   1000011-  Superfund Fact Sheet, Vega Alta Public Supply Well
     1000013   Site, Vega Alta, Puerto Rico, undated.
                                60

-------
                  RECORD OF DECISION FACT SHEET
                          EPA REGION II

Site;

Site name: Vega Alta Public Supply Well Site

Site location: Vega Alta, Puerto Rico

MRS score (date of score):  42.24 (9-1-84)

EPA ID Number:PRD980763775

Record of Decisiont

Date signed: 9/30/97

Operable Unit: OU-2

Selected remedy: Soil Vapor extraction System

Estimated Construction Completion:  Two years

Capital cost:   (in 1997 dollars) $2,777,DOOM

Annual O & M cost: $502,900

Present-worth cost: $7,473,000   (5% discount rate for 10 years)

Lead;

U.S. Environmental Protection Agency Enforcement

Primary Contact: Adalbert© Bosque,   (787) 729-6951 ext. 236

Secondary Contact: Melvin Hauptman,  (212)  637-3952

Main PRPs: Dave Thompson ,  General Electric Co.,  (610)992-7890
           David Martin, Unisys  Corporation,  (610)993-3039

Waste;
Waste type: Volatile Organics

Waste origin: Wastes generated during plant operation

Estimated waste quantity: not known

Contaminated medium: soil

-------