EPA-AA-IMS-30-5-B
      TECHNICAL REPORT
       SEPTEMBER,  1980
 RECOMMENDED SPECIFICATIONS
             FOR
EMISSION INSPECTION ANALYZERS

-------
                                                            EPA-AA-IMS-80-5-B
                              Technical Report
                               September, 1980
                         Recommended Specifications
                                     for
                        Emission Inspection Analyzers

                                     by

                             William B. Clemmens
                                   NOTICE
Technical Reports  do  not necessarily represent final EPA decisions or posi-
tions.  They are intended to present technical analyses of issues using data
which are currently  available.   The purpose  in  the release of such reports
is to  facilitate  the  exchange  of  technical  information and  to  inform the
public  of  technical developments  which  may form the basis  for a final EPA
decision, position, or regulatory action.
                      Inspection and Maintenance Staff
                    Emission Control Technology Division
                Office of Mobile Source Air Pollution Control
                    U.S. Environmental Protection Agency

Note:     This report  (-80-5-B)  is the second section of two sections.  The
          first section  -80-5-A contains  Background, Technical Discussions,
          and Policy Information on Inspection Analyzers.  Both sections (-A
          and -B) are available separately.

-------
                              Table of Contents



                                                                      Page

Acknowledgments                                                         5

                         	 Executive Summary 	                    6
                         	 Technical Report 	
                      Chapters I through V can be found
                                     in
                              EPA-AA-IMS-80-5-A
                     	 Analyzer Specifications 	                 10

VI.  How to Use The Specifications                                     11

     A. Overview                                                       11
     B. Analyzer Technology                                            12
     C. Change Notices                                                 12
     D. Definitions and Abbreviations                                  13

VII. Recommended State Minimum Specifications                          16

     A. Gases                                                          19
     B. Gas Cylinders                                                  21
     C. Durability Criteria                                            22
     D. Design Requirements                                            23
     E. Analyzer Performance                                           31
     F. Sample System Performance                                      34
     G. Operating Environment                                          36
     H. Fail-Safe Features                                             37
     I. System Correlation to Laboratory Analyzers                     38
     J. Manuals                                                        39

-------
                        Table of Contents (continued)
VIII. Additional System Specifications
      Recommended For Decentralized Inspection Programs

     A. Automatic Zero/Span Check                                       41
     B. Automatic Leak-Check                                            43
     C. Automatic Hang-Up Check                                         44
     D. Automatic Read System                                           45
     E. Dual Tailpipes                                                  45
     F. Automatic Test Sequence                                         46
     G. Printer                                                         48
     H. Vehicle Diagnosis                                               48
     I. Anti-Tampering                                                  48
     J. System Diagnosis Testing                                        49

IX.  Optional Features For The Inspection Analyzer                      50

     A. Automatic Data Collection                                       50
     B. [Deleted]                                                       52
     C. Anti-Dilution                                                   53
     D. Loaded Mode Kit                                                 54
     E. Engine Tachometer                                               55

X.   Future Improvements For The Inspection Analyzer                    56

     A. Introduction                                                    56
     B. Improvements in Water Removal                                   56
     C. Improvements in HC Measurement                                  57

XI.  Evaluation Procedures                                              59

     A. Traceability of Analytical Gases                                60
     B. Gas Cylinder Specifications                                     61
     C. Durability Test Procedures                                      62
          1. Vibration and Shock                                        62
          2. Sample Line Crush                                          64
          3. Sample Handling Temperature Effect                         67
          4. Filter Check and Hang-up
     D. Design Requirement Inspection and Test Procedures               70
          1. Useful Life                                                70
          2. Name Plate                                                 70
          3. Sample System                                              70
          4. Sample Pump                                                70
          5. Sample Probe                                               70
          6. Sample Line                                                70
          7. Analyzer Spanning System                                   71
          8. Analyzer Ranges                                            71
          9. System Grounding                                           71
         10. System Vents                                               71

-------
                   Table of Contents  (continued;
E. Analyzer Performance Test Procedures                            72
     1. Calibration Curve                                          72
     2. Resolution                                                 74
     3. Compensation                                               75
          a) Altitude                                              75
          b) Pressure and Temperature                              78
          c) Non-Compensated- Systems                               81
     4. Zero and Span Drift                                        82
     5. Span Drift (see E.4.)                                      85
     6. Noise (see E.8.)                                           85
     7. Sample Cell Temperature                                    86
     8. Gaseous Interference and Noise                             88
     9. Electrical Interference                                    91
    10. Propane to Hexane Conversion Factor                        95
F. Sample System Test Procedure                                    98
     1. Sample Cell Pressure Variation, Low Flow and               98
        Response Time
     2. (See F.I.)                                                 102
     3. (See P.I.)                                                 102
     4. (See F.I.)                                                 102
     5. System Leakage                                             103
     6. (See C.4)                                                  104
G. Operating Environment Test Procedure                            105
H. Fail-Safe Systems                                               107
     1. Warm-up Lock-out                                           107
     2. Low Flow                                                   109
I. System Correlation Test Procedures                              110
     1. NDIR Correlation                                           110
     2. FID Correlation                                            114
J. Micro Processor Systems                                         117
     1. Automatic Zero/Span                                        117
     2. Automatic Leak Check                                       117
     3. Automatic Hang-up                                          117
     4. Automatic Read                                             117
     5. Dual Tailpipes                                             118
     6. Automatic Test Sequence                                    118
     7. Printer                                                    118
     8. Vehicle Diagnosis                                          118
     9. Anti-Tampering                                             118

-------
                              Acknowledgments
The contributions  and  stimulating discussions with Merrill Korth and Gordon
Kennedy of EPA  during  the formative stages  of  the technical specifications
are greatly  appreciated.  The  inputs  and numerous  reviews  provided by the
Equipment and Tool Institute Performance Test Group  have  greatly aided the
preparation of this specification.

-------
EXECUTIVE
 SUMMARY

-------
                              EXECUTIVE SUMMARY
                 EPA Recommended Instrument Specifications

The  instrument  used  to measure  motor  vehicle  exhaust  concentrations  of
hydrocarbon  (HC)  and  carbon  monoxide  (CO)  is  typically  called  a  garage
analyzer.  This commonly used  title has  considerable  significance  to the I/M
program  Administrator  choosing  a  minimum specification  for  exhaust  ana-
lyzers.   The  word  "garage"  indicates the  location where  the instrument  is
used.  "Garage"  also refers  to its intended use; to  assist in the  diagnosis
and  repair  of  engines and emission control systems.  As those familiar  with
diagnoses and  repair using an exhaust analyzer know, the relative  level  of
pollutants, and  the change in emission  levels  in response to an  adjustment
or repair, are most important  in servicing a vehicle.

The  I/M  program places  a new burden  on these  instruments: inspection.   An
inspection of  the  vehicle's  exhaust requires an accurate measurement  of the
pollutant  concentration,  not  just  a  relative  level.   Whether  a  vehicle
requires  repair  depends  on this measurement, and accuracy becomes  an  impor-
tant consideration.  The instrument must  provide a  repeatable measurement  in
order  to assure  equitable  inspection  for  each  motorist.   The  failure  to
achieve  repeatability  inevitably  results  in  challenges  to  the   program's
credibility.                    (

The  current garage type  repair  analyzer  has been used  as an  inspection
analyzer  in currently operating I/M programs.  In  centralized I/M  programs,
its  design  capability has been greatly  complemented  by computer control and
very, frequent  calibration  and maintenance.    It  is continually  under  the
watchful  eye of  an experienced instrument technician, and  its working envi-
ronment is often carefully controlled.

In decentralized  I/M programs, the repair analyzer has also  been  used as  an
inspection  tool,  but  with little  consideration  for its  original  intended
use.  The one  concession to this situation has  been periodic  state  checks  of
the instrument's calibration.

In the  garage  environment, the inability of  the repair analyzer  to provide
accurate  and  repeatable measurements  is well  established.  A recent NHTSA
study  indicated  32  percent of field use exhaust analyzers  were reading  more
than  15  percent too high or  too  low.   The study  had  attempted  to use the
industry  standard  of accuracy of ±3%, but found virtually  no analyzer could
meet this  requirement.   At ±5%, 93 percent  of  analyzers were inaccurate  or
not  repeatable.

In  addition,   the performance specifications of  repair analyzers  often are
inappropriate  for  inspection purposes.   As an  example, most  instruments are
designed  to operate  at  0 to  85% relative  humidity.  As an  inspection  ana-
lyzer, this could  preclude use on high  humidity days.   In  many areas  of the
country,  this  specification effectively  limits  the  use of  the instrument for
a  large  portion  of the  year.   This  is of course an impractical result, yet
the  instrument  manufacturers have  done nothing   to  rectify this  problem.

-------
Several attempts  to  improve the inspection analyzer by establishing minimum
specifications have been made.  In 1974, the California Bureau of Automotive
Repair (BAR) published its  first minimum instrument specification applicable
to garages participating in its Blue Shield inspection program.  In 1980 BAR
upgraded  this  specification.   This  year,  the -Equipment  and Tool Institute
(ETI), an industry organization,  published  its  own  specification,  and has
widely disseminated  it  to states preparing I/M  programs.   EPA has reviewed
each of these  specifications and finds them lacking in two areas:  1)  fail-
ure to consider how the operator affects the measured results, and 2) speci-
ficity of accreditation procedures.

Based on  an  error propagation model, EPA determined that the most important
factor involving  accurate exhaust measurements  was  proper operating proce-
dures.   EPA  determined   that  incorrect  gas  spanning  (calibration)   could
affect emission measurements  by up to  40%,  improper  purging by up to  100%,
leaks by  100%,- and improper meter reading by 20%.  Under the best of condi-
tions, current equipment has a measurement accuracy of 25% to 35%.

The  assessment indicated  that  minor,  but  important design  changes  could
improve optimum  accuracy to  the 10 to 20 percent range.   The improvements
involve  the  detector,  sample  cell,  and  signal  conditioning,  and  can be
incorporated into  existing  designs with relative  ease.  EPA recommends that
all  states  implementing.centralized I/M programs  adopt  the EPA recommended
specification  for  a  manually operated  analyzer.   The specification, includ-
ing  detailed  acceptance  procedures,   can  be  found  in  EPA-AA-IMS-80-5-B,
"Recommended Specification  for Emission Inspection Analyzers".

These improvements do not  address the proper  operation  of the instrument.
Iii centralized programs,  this is dealt with  through  use  of inspection per-
sonnel thoroughly familiar with  the instrument,  through  recordkeeping and
frequent  calibration  and  maintenance,  and often  through  real  time computer
control of the instrument.

In decentralized  programs,   the  station operator  or  mechanic  cannot be ex-
pected to become  an  instrument technician,  the sophistication of  the in-
strument precludes this.  The cost pressures of completing the inspection as
rapidly as possible encourage failure to provide proper calibration and leak
checks.   In  fact,  the calibration  and  maintenance  requirements  of  these
analyzers  exceed   those  of  any  other  garage instrument.   Incompetence and
fraudulent  practices  are  also  considerations   in a  decentralized  program
because of minimal inherent checks on the quality  of the operation.

The advent of  the $15 pocket calculator and the $800 home computer provides
a  practical  solution  to  most  of  the  problems  of proper operation  of the
inspection analyzer  in a decentralized I/M program.  With  the addition to
each instrument of a small microcomputer, the inspection instrument can take
on most of the calibration  and recordkeeping burden.  This computer operated
analyzer  will  restrict  operation until the unit is fully warm, will provide
for  automated  gas span  and  leak  checks,  can  accept  vehicle ID  and  other
information, will  automatically make the pass/fail decision, will provide  a
hard copy output  (which  can  include diagnostic  information),  and can  store
pertinent data on magnetic  tape for future state analysis.

-------
Such  analyzers  are not  a wishful  dream.   One  repair  analyzer produced by
Hamilton  Test  Systems incorporates  some of  these features  and  is commer-
cially available.  The New Jersey inspection program is currently evaluating
a computerized unit  produced by Sun  Electric.   New York State has recently
contracted  for  over  4000  computerized  analyzers  for  its decentralized I/M
program.   Given  these  recent  developments,  EPA's  assessment of  9  to 18
months  before  quantities of  units meeting  its specification are  available
may be overly pessimistic.

EPA  strongly recommends  that  each  state  implementing  a decentralized I/M
program adopt the  EPA specification  for a  computer operated analyzer.  The
complete  specificationx and  detailed  acceptance procedures  can be found in
EPA-AA-IMS-80-5-B   ("Recommended   Specifications  for   Emission  Inspection
Analyzers").  A drawing  of  an existing  prototype follows  this  executive
summary.  EPA Report  EPA-AA-IMS-80-5-A  ("Analysis  of the  Emission Inspection
Analyzer")  provides  considerable  information  on  the  need  and benefits of
adopting the computer operated  analyzer.

Computerized  features will  increase  the  cost   of  the  inspection  analyzer.
The attached report  (EPA-AA-IMS-80-5-A) estimates  that the full cost  of the
analyzer  will  be recovered  for 2  to 3  dollars  per test.  In addition, the
cost  to  the  garage  owner  can be  reduced  through investment credits and
depreciation.  These  considerations are fully  discussed  in the report.  The
estimated  cost  (1980 dollars)  of   the  various   types of  analyzers is  shown
below.

     EPA computerized                         $6195 to 7395
     EPA manual operation                     $4490 to 5690
     BAR 80 certified                         $3750 to 4950
     Current Repair Analyzer  (ETI)            $3000 to 3750

The  computer operator  analyzer will  allow  a  reduced   frequency  of  state
audits  of licensed decentralized  inspection stations.   Because  of the in-
strument's  self-calibration feature,  quarterly audits  will  provide  quality
assurance  equivalent  to  the  otherwise  required monthly audits.    This  pro-
vision  will reduce program administration costs,  and should  be an  incentive
for State adoption of the EPA recommended analyzer.

The  impact  on  implementation schedules  of  the  lead time to  procure  instru-
ments  meeting  this specification  is  discussed  in a separate memorandum to
EPA's  Regional  Administrators  from the  Assistant Administrator  for  Air,
Noise and Radiation.

Finally,  the I/M staff at EPA's Ann Arbor facility is  available  to  provide
additional  assistance and  information  as  necessary.   You  may contact Tom
Cackette, Donald White, or Bill Clemmens at  (313)668-4367.

-------
        10
   ANALYZER
SPECIFICATIONS

-------
                                       11
VI.  How to Use the Specifications

A.   Overview

The recommended specifications  are presented in the next four chapters (VII
through X).   Chapter VII  presents the  basic  specifications for insoection
analyzers.  Those  specifications are designed  to  be  consistent  with manual
operation of  the  analyzer.  Chapter VIII  describes  the additional features
that would be  needed to create  a  computer operated  analyzer from the basic
Chapter VII analyzer.   The performance aspects of the  Chapter VII specifi-
cations are applicable  to  both  the manual  and  computer operated analyzers.

Optional  equipment  such  as automatic  data aquisltion for either  type  of
inspection analyzer  are detailed  in Chapter  IX.   Chapter  X  provides some
suggestions for  future improvements  that  should be made  to the basic ana-
lyzer.

An  important  aspect of  any set of specifications is  the interpretation of
those  specifications.   The  specific  test  procedures  used  to  evaluate the
performance of  a  piece  of equipment  essentially  determines one interpret-
ation of  the  requirements.  Different test procedures  can provide different
results.   The  order  that the  tests  are  performed   can  also  affect the
results.

Chapter XI provides the EPA recommended evaluation  test procedures.   These
procedures are intended to provide a consistent technique to verify analyzer
performance.   The  suggested testing order  is:

     1.  Follow manufacturer's   initial  start-up  and pre-test  procedure  as
     listed in the manufacturer's manual(s).

     2. Durability Tests

          1st - Vibration  and Shock Test

          2nd - Sample Line Crush  Test

          3rd - Temperature Effect

          4th - Filter Check

     3. Inspection Design  Requirements

     4. Analyzer Performance

     5. Sample System Performance

     6. Operating  Environment Test

     7. Fail-Safe  Features

     8. Correlation  Tests

-------
                                     12
If an analyzer passes the evaluation tests, the user can be fairly confident
of the in—use emission test results from that particular analyzer.  In order
to apply  the  evaluation results to the  general  production line units, more
analyzers  must  be  tested.  A  recommended  quality audit  testing  plan  is
provided in the introduction to Chapter VII.

B.   Analyzer Technology

These specifications were  determined  based on current I/M practice of using
non-dispersive  infrared   (NDIR) ' analyzers  for  HC  and  CO  measurements.
Nothing  in these  specifications  should be construed as  prohibiting other
analysis  techniques.   Potential improvements  in technology  should  be con-
sidered  on a  case by  case basis.   To  that  extent,  many of  the concepts
expressed by these specifications can be applied.

C.   Change Notices

At the present EPA has no  formal mechanism  for disseminating  improvements or
interpretations on subjects discussed in  technical reports.   The exception
is  if  the report   is published  as  part of  a formal notice or regulation in
the Federal Register.   In  that case, dissemination of changes occur  through
technical amendments, also'published in the Federal Register.

In  the  case of  this  report, experience gained  through  widespread use will
most  likely lead  to  improvements  in  the  test  procedures.   Further,  new
technology  may  obsolete certain  parameters while  at  the  same time  require
evaluation  of  new or  additional  parameters.  The  point  to  stress to State
Program Managers  is that  any  specification on  I/M analyzers  should allow
some  flexibility   to  deal   with  the  issues just  mentioned.   However,  the
flexibility for change must be predicated on the concept of "meet or  exceed"
the  criteria  listed   in  the  recommendations.   In  practically  all cases
verification  of  the meet  or exceed  criteria  would be  required, and would
include  comparison testing  and  statistical  evaluation  of  the  test data.

-------
                                    13
D.   Definitions and Abbreviations

The  following definitions  are  for  reference.   For many  definitions,  the
specific test procedures used for verification of the specifications provide
the final interpretation.

     1.   Accreditation;   Certification  that  an  analysis  system  has been
     tested  by  the  required  procedures,  and it has  been verified that the
     analysis system complies with those specifications.  Further, accredi-
     tation  implies  that the  analyzer manufacturer follows proper procedures
     to  insure  that  subsequent  production systems'  are also in compliance.

     2.   Accuracy;   The  combination  of  bias  and  precision  errors,  tech-
     nically  defined as Uncertainty,  that quantify  the difference between
     the analyzer reading and the true value (see equivalency).

     3.   Analytical Gases;   Gases  of known concentration  used in the ana-
     lytical process as a reference.  The four basic 'categories are:

                     Gas                                 Use
          a) Zero Gas                        Laboratory, Manufacturer, and
                                                  State Auditor
          b) Calibration Gas                 Laboratory and Manufacturer
          c) Audit Gas                       State Auditor
          d) Span Gas                        Field Emission Inspector

     4.   Analysis System;   A system  that incorporates  an  analyzer(s)  and
     sampling components ,for  the purpose of exhaust gas analysis.

     5.   Analyzer;   A device that  has the  capability to identify unknown
     concentrations  of  particular  constituents  in   automobile   or  truck
     exhaust gases  by comparison to analytical  gases.  Commonly used  inter-
     changeably with "instrument".

     6.   Calibration;  The act of defining or checking the full calibration
     curve  of  the  analyzer.   Generally considered  a laboratory procedure,
     calibration  requires  6  to  12 calibration  gases  per analyzer range or
     scale.

     7.   Calibration  Curve;   A  curve  (usually  a polynomial)  that  describes
     the  relationship  between  meter   movement   (i.e.  chart  deflection or
     voltage)  and concentration level.  For  field  instruments the calibra-
     tion curve is usually fixed at the factory.

     8.   Calibration  Gases;   Analytical  gases  that are  used to  determine
     the accuracy of an analyzer calibration curve.

     9.   CO:  carbon  monoxide

-------
                               14
10.  CO ;  carbon dioxide

11.  Detector;   The  portion of the analyzer that detects  the constitu-
ent of  interest,  and provides the original  signal  proportional to the
concentration of the constituent.

12.  Drift;   The average amount of change  with time of analyzer  read-
ing.  Two components of drift are:

     a) Zero drift - average change in zero reading
     b) Span drift - average change in the difference between zero and
                     span readings

13.   Dry-Basis  Concentration;   The  resultant  concentration  after the
water has  been   removed  from the sample either physically or by  elec-
tronic simulation techniques.

14.   Equivalency;    A  statistical  comparison   of a  candidate  analysis
system performance versus  the  reference analysis system performance on
exhaust  gas  in   order  to determine the  acceptability of  the candidate
system.

15.  FID;  Flame ionization detector.  Most common  laboratory  analyzer
used  for  determination  of  hydrocarbon  (HC) concentrations in exhaust
samples.

16.  fs;  Full scale of  the analyzer.

17.  Hang-up;   Hang-up refers to the  process  of hydrocarbon molecules
being  absorbed,  adsorbed,  condensed,  or  by any other  method removed
from the sample  flow prior to reaching the analyzer detector.  It also
refers  to  any subsequent  desorbtion  of the molecules  into the sample
flow when they are assumed to be absent.

18.  HC;  hydrocarbons

19.  Instrument;  see analyzer

20.   Interference (electronic);   Analyzer  read-out errors  caused  by
instrument response  to electromagnetic sources and  power  supply varia-
tions.  Common forms of  electromagnetic sources are:

     a)  Radio Frequency Interference  (RFI)

     b)  Very High Frequency Interference  (VHF)

21.  Interference (gases);   Analyzer  read-out   errors caused by instru-
ment  response  to non-interest  gases  typically  occurring in  vehicle
exhaust.

22.  L.S.;  Low  scale  or range of the analyzer.

-------
                               15
23.  NDIR;  Non-dispersive Infrared Analyzers

24.  Optical Bench;   The  portion of the  analyzer  that consists of  the
main sample processing  and detecting assembly.  Generally included  are
the  detector,  optical  filters,  sample   tubes,  infra  red  source,  and
chopper systems.

25.   Precision;   Statistical  quantification  of  random  measurement
errors.

26.  ppm;  parts per million by volume

27.  ppm C;  ppm by Carbon atom

28.  ppm C3 or ppmp:  ppm propane (C0 H0)
     1 '        ^  ^                  j  o
29.  ppm C6 or ppmh;  ppm n-hexane

30.  Propane  to Hexane  Conversion Factor;  A  factor  that accounts  for
the difference in analyzer response (relative response) between propane
and  n-hexane.   Sometimes  referred to  as a  "C"  factor, or  a propane
equivalence factor (P.E.F.).

31.  Response;  Analyzer indication to a  gas.

32.  Response  Time;   The  reaction time between a  change in concentra-
tion at  the  inlet to the sample  system and the time  the  analyzer  indi-
cates a given percentage of that  change.

33.  Sample System;  The portion  of the analysis system that is respon-
sible for delivering an unaltered sample  to the analyzer.

34.  Span  or  Spanning;  The act of adjusting  the analyzer's calibration
curve  into the  correct  reference frame.   Gas  spanning uses  a span  gas
for  a  reference  during  the  adjustment  process.   Electrical spanning
attempts to duplicate the span gas voltage level to be used as a surro-
gate reference during the adjustment process.

35.  Span  Gases;   Analytical gases  that  are  used  to adjust or return
the  analyzer  response characteristics to  those determined by the  cali-
bration gases.

36.   Zero Gas;   An  analytical  gas  that  is  used  to  set the analyzer
response at zero.

-------
                                     16
VII.  Recommended State Minimum Specifications

The recommended  State minimum specifications are  intended  to be applied  to
both decentralized  and centralized analysis  systems.   The  particular speci-
fications in  this  chapter are written  with the assumption of manual opera-
tion  of  the  analyzer.   In  order  to  perform  the  proper  interactions,  the
operator  must have  a set  of written  instructions that are equivalent  in
function  to the  sequence  of events  performed  by the computer  analyzer speci-
fied for decentralized systems described  in Chapter VIII.   It is  recommended
that the analyzer manufacturer provide  these  written instructions,  and it is
necessary that  the  centralized programs  implement  these  procedures.in order
to properly utilize the analysis  systems.

These specifications  are  intended  to apply to  a manufacturer's  entire  pro-
duction  of  inspection analyzers.   In  order  to verify  that  the  production
line does meet the specifications,  the  testing  plan in  Table  VII-1  is recom-
mended.   Reciprocity  of  qualification  and QA/QC  testing  results  should  be
accepted.

In  preparing  the analyzer  for qualification or QA/QC testing,  many evalu-
ation  test  procedures  require monitoring  of  internal  analyzer signals  or
parameters.   In  order  to  decrease  evaluation  set-up  time,  the  analyzer
manufacturer  may instrument  the candidate  analyzer(s)  to provide convenient
access  to the necessary signals.  No other  modifications  are  allowed, and in
some  cases  the  manufacturer  may be  required  to  prove his  instrumentation
process does  not affect the analyzer's  performance.

-------
                                      17
                                 Table VII-1

                      Recommended Qualification Program
I.   Pre-Production

The  manufacturer may  receive  a  preliminary  accreditation,  valid  for  six
months, by providing  a publicly released report  which  demonstrates that at
least one pre-production unit has passed all evaluation tests.

II.  Initial Production QA/OC

1.  The manufacturer  shall  also select,  in a  randon manner,  three  of  the
first 20 production units, and all three shall receive all evaluation tests.

2. If two of the three units pass all evaluation  tests, the  instrument  shall
receive full accreditation  valid  for a period  of three years  from the  date
the first unit was produced.

3. If two or more units fail the evaluation tests, corrections  to  the design
and/or production must be made, and three  additional units selected from  a
new or current  production run.  Two of these three must pass  all  evaluation
tests.

4. All  units covered  by a preliminary accreditation and  produced prior to
the production run in which full accreditation is received shall be required
to incorporate the necessary design and/or production fixes.

III. Subsequent Production QA/QC

The  accreditation  may be  renewed  for  a  three year  period at  any time by
passing all  evaluation tests  on two of three units selected randomly from  a
production run of 20.

IV.  QA/QC Testing Criteria

1.  Two(2)  of  the  three(3)  production  units must  pass  with  no  design or
random failures.

2. A design failure is defined as a failure to meet the evaluation procedure
criteria.

3. A random failure  is defined as  the  failure  of  a  standard part in  the
system  (i.e.  pump,  electrical resistor,  etc.)  where  improved procurement
specification,  assembly  technique,  or pre-assembly  QC on  that  part  would
reduce failures in the field.

4. An  infant  mortality is defined as the total failure of a part  (usually  a
computer chip or related components) within a short period of  time after  the
unit  first  receives  any  electrical  power.   Infant  mortality  failures  must
have sufficient documentation  (i.e. published report  available  to  regulatory
bodies) to justify why the failure can be attributed  as infant  mortality  and

-------
                                     18
not minor  design failure.  Infant mortality  failure is not classified as an
analyzer  failure if  the  failure would be  obvious  in the  field.  After  re-
pairs,  those  tests  that  might  be  affected  by  the  repairs  must be  rerun.

5. Random  failures must have  sufficient documentation (i.e. published  report
available  to  regulatory bodies)  to justify,why  the  failure can be attributed
as a  random  failure  and  not minor design  failure.  Random failures  may be
repaired  on  pre-production units only.   A  condition to allow the repair of
the pre-production  analyzer is  the development  of  a plan  (where necessary)
to prevent the specific type  of  failure  in  production units.   After  repairs,
those tests that might be affected by  the repairs should be rerun.

-------
                                                   Spec: A.I.-2.
A.  Gases

     1.  Accuracy

          a) Calibration and Audit gases:  +  2% of True Value,  or
                                           +  1% of NBS Standard Reference
                                           ~  Material  (SRM)

          b) Span gases:  + 3% of True Value, or
                          + 2% of NBS Standard Reference Material

          c) Zero gases:  less than 10 ppm C  hydrocarbon
                          less than 50 ppm CO
                          less than 1000 ppm  CO

     2.  Composition

          a) Span gases should be CO and HC  (propane) with N« as diluent

          b) Calibration and Audit gases should be:
                - --^^-^^—^-^^—^—^^-^-^^—^—^^—            -s

               ±)  HC  (propane) with N« as diluent,  and

               ii) CO with N2 as diluent

          c) C0? with N« or air zero gas as diluent  (span or calibration)

          d) Zero gas may be

               i)   bottled air,

               ii)  chemically purified room  air  such as with an activated
               charcoal trap on the analysis  system, or

               iii) ^catalytically purified room air

          e)   Hexane  to  propane  conversion factor  checking gases  shall
          consist  of  n-hexane in  nitrogen,   gravimetrically  blended  to the
          accuracy of  SRM's.   The  gravimetric analysis  is  only valid  for  1
          year from the date  of analysis unless  historical  data and  corre-
          lation  checks can  verify stability of  the gas concentration. The
          gravimetric analysis is void if the gas cylinder temperature drops
          below  20eC  (68°F)  for any  reason  including shipping  and  storage.
          An alternative to the 20°C minimum  temperature is to  condition the
          gas  cylinders at  least one week after  receipt of the cylinders  in
          a temperature environment  between  27°C (80.6eF) and  48°C  (118°F).
          During  the one week conditioning, the cylinders shall be stored  on
          their sides, and  rolled  at least once  a  day.   Storage thereafter
          should  be  above  20°C  (68°F).   The  required  concentrations  are:

               i)  250 ppmh ( +_ 15 ppmh)

               ii) 1500 ppmh ( +_ 150 ppmh)

-------
                                             Spec: A.3.
3.  Recommended number of gases

     a) for evaluation testing

          i) 7 equally spaced concentration values of calibration gases
          per range

          ii)  bottled zero gas

          iii)  2  concentrations of  hexane/propane  conversion factor
          checking gas

          iv)  1 cylinder of 14% CO

          v)   1 cylinder of 100 ppm NO

     b) for in-use systems

          i)  one  span gas  concentration between  70-95% of  fs on low
          range for each HC and CO analyzer.  For standardization, 1.5%
          CO and 600 ppm C_ are prefered.

          ii) purified room air zero gas

          iii) for systems that use a C0_ analyzer, on span gas concen-
          tration between 8 to 12 percent C0_.  For standardization 10%
          CO _ is prefered.

     c) for  periodic  check (i.e. State audit) of in-use systems (final
     guidelines will  appear  in  follow-on EPA recommendations for State
     audit quality assurance programs)

          i) a minimum of 3 concentrations per range  for each analyzer,
          or

          ii)  one  concentration for each  cutpoint  and 207(b)  standard
          (if applicable)  with  a concentration value within  10 percent
          of the cutpoint (need not exceed 5 concentration levels), and

          iii) bottled zero gas

          iv) one cylinder of 14% CO

-------
                                    21
                                                  Spec: B.I.-2.
B.  Gas Cylinders

     1.  In-use Span gases

          a) Gas  cylinder  should  be of  a "1A"  or  "T" size.  Single blend
          capacity  (HC  in  air  or, CO  in  N )  is  generally around 200 cubic
          feet  at 2000  psi.   Dual  blend  (HC and  CO in  N~)  is generally
          around  160 cubic  feet at 1600 psi.

          b) All  cylinders  shall  meet DOT  specifications for  "1A"  or  "T"
          cylinders.

          c) Gas  cylinders  smaller (or larger) than  the "1A"  or "T" size  may
          be used provided  that:

               i) The analysis  system gas useage for  the  various operations
               (i.e., gas  span,  leak check,  etc.) is  such  that the span  gas
               in  the smaller  (or  larger)  cylinder  will last  at  least  6
               months when  using the recommended  frequencies  of those opera-
               tions.  Span gas useage rate should  be  identified during  the
               evaluation testing.

               ii)  The  analyzer  manufacturer  performs  a source  study  to
               insure  adequate  availability  of  the  smaller  (or  larger)
               cylinders  in sufficient quantity  to  service  analyzers using
               that bottle  size.

               iii)  Regardless  of the  results of the source study,  if  the
               smaller  (or  larger)   cylinders are  not  available  in  some
               areas, or if those  cylinders become  unavailable at a later
               date,  the manufacturer  must make available  a  retrofit  kit
               that will allow  the use of a "1A"  or  "T" cylinder.

          d) Disposable cylinders may not be used.

     2.  Concentration Label

     A semi-permanent  label shall be affixed  or  attached by the Certifying
     Laboratory to each gas cylinder with the  following information.

          a) Name of the Gas Blender

          b) Name of the Laboratory Analyzing  the Gas  Blend

          c) Cylinder I.D. number

          d) Date of Analysis

          e) Traceability to NBS or  to other certified EPA Mobile Source
          Standard

          f) Statement of Impurities  (See accuracy and  composition require-
          ments)

          g) Gas  Concentration

-------
                                    22
                                                  Spec: C.I.-4
C.  Durability Criteria

     1.  Vibration and Shock Test
          (See Test Procedure)
     2.  Sample Line (see Test Procedure)

          a) Line crush
         Sample Handling System Temperature   :
         Effect

          a) Unloaded System - 20 minutes
                               600°F sample
                               inlet
          b) Load System - continuous at 1000°F
                           sample inlet

         Filter Check (see Test Procedure)

          a) 2 hr sample time                 :
          b) Sample until "low flow"
              indication
a) span shift:  2% fs LS
b) All analyzer and system
   performance checks must
   be met.
i) No visible failure or
   deterioration
ii) Meet leak check
    specifications
iii) Meet response time
     specifications

a) No visible failure
   or deterioration.
b) Meet leak check
   specification.
c) Meet response time
   specification.  .
d) Meet HC hang-up
   specification.
i) Low Flow Not Activated
ii) Meet Leak Check
    specifications
iii) Meet Response Time
     Check
iv) Meet HC hang-up check

i) Time until "low flow"
   system activates or 20
   hr of sample.
ii) Until the low flow
    system activates the
    system response time
    must be met.

-------
                                    23            Spec: D.l.-3.d.)
D.  Design Requirements

     1.   The  analysis system  shall be  designed  with a  design  goal of a  5
     year minimum useful life.  Useful life has terminated when  the  analysis
     system can  no  longer  be repaired  to meet  the  specifications in  this
     document at  a  cost  of less  than  60 percent  of the  replacement cost at
     the time of  repair.

     2.  NAME PLATE Permanently Located  and Readable.

          a) Analyzer System Manufacturer

               i) Name
               ii) Address
               iii) Phone number  (customer service)

          b) Analyzer Model Number and Serial Number

          c) Date of Analyzer System Assembly

     3.  Sample System

          a)  Sample  system components  should be  designed  for  intermittent
          sampling  (20 minutes  out of  10 hr.)  of 600°F inlet (to probe)
          exhaust temperature.   Such  systems shall be designated "Unloaded"
          analysis  systems.  Systems  designed  for continuous  duty with  a
          minimum of 1000°F inlet (to probe) exhaust temperature, and proper
          sample handling equipment (i.e. water removal and/or heated lines)
          may be  called "Loaded" analysis  systems.

          b)  The  type of  system (Loaded  or  Unloaded)  shall be permanently
          attached and prominently displayed in large letters.

          c) The materials  used in the sample handing system shall not  alter
          the exhaust  sample.  Some examples  of  non-reactive materials are
          teflon  , ,viton  ,  stainless steel,  silicone  rubber  (red), and in
          some  areas  nylon .    Some  examples  of  reactive  materials   are,
          brass, copper, and tygon".

          d) Water Trap:

               i) A  water  trap  shall be included  in the  sample  system.  The
               trap shall be self draining, visible to the operator, and the
               sample  system  shall  be  designed to  prevent condensable  water
               from  occurring  in the sample  system downstream of the  water
               trap.   The   following  options  may  be  used  but  are  not re-
               quired.

                     1.   Option  1:  A dry-basis measurement  is  permitted if
                    the  absolute  moisture content  entering  the analyzer is
                     less  than the  saturation  moisture content  at   a sample
                    gas temperature  of  7°C (45°F).  Ice  traps or refrigera-
                     tors are permitted.

-------
                             24
                                                  Spec:  D.3.e)-5.a)
               2.   Option  2:  Electronic  correction  to a  "dry-basis"
               reading is  permitted  if  the  temperature and pressure of
               the"  sample  after  the water  trap  is  measured  and  the
               sample  is  assumed  to  be  saturated  at  the  measured
               temperature.   The  water correction  system must  be  de-
               activated for leak checks.

     e)    Particulate Filter

          i)  A  particulate filter(s)  shall  be  included  in  the sample
          system.

          ii)  The major  or pre-filter (if used) shall  be  located in a
          manner  that  allows convenient  filter element  replacement.

          iii)  The  proper  direction  of flow for the filter body(s)  and
          element(s)  (if  applicable)  shall be  indicated in  a manner
          that  is easily discernible.

          iv)  The  filter  body  shall be designed to  provide leak free
          operation with normal filter element  changing  frequency  for
          the  lifetime  of the  analyzer,  or a  parts  list of  specific
          replaceable parts  shall be listed in  the maintenance manual
          as parts that may contribute to sample system leaks.

          v)  If  a  filter(s)  is  on the vacuum side of  the  system,  all
          manuals  and  filter element  replacement  instructions shall
          indicate  that  the  system should be leak checked every time a
          filter  element  is changed.   A  similar message  should  be
          located on or near the filter body(s).

          vi)  The filter element and filter system shall be designed to
          prevent  particulates   larger in  size  than  5  microns  from
          entering  the  sample cell  of the analyzer.   The  location of
          this optical  bench  5  micron filter is up to the manufacturer
          and  may be  on the pressure or vacuum side of the system.   If
          this  filter only  filters   sample  gases  passing through  the
          analyzer, the  manufacturer may  elect  to have  an  additional
          filter prior  to  the system pump(s).   The particulate  size of
          this  optional  filter  is  at  the  discretion  of  the manu-
          facturer.  Verification of filter particulate size removal is
          permitted to  be determined by  the filter manufacturer using
          standardized ASTM or Filter Industry procedures.

4.   Sample Pump

The  sample  pump shall  be designed  for  at least  a 2000 hour life of
continuous duty.

5.   Sample Probe

     a)  The  probe must  sample  at  least  16 inches  from the  end of  the
     tailpipe or dilution  adapter.

-------
                               25            Spec: D.5.b)-6.c)
     b)  The  probe shall  have  a  flexible  portion that  will allow the
     probe to  be ^inserted  in  a  1% inch  O.D. tailpipe.   Assume the
     tailpipe has a  3  inch  radius 90° bend beginning 4 inches from the
     end of the tailpipe.

     c)  The probe shall be designed for easy servicing and/ or replace-
     ment.

     d)  A leak  proof  dilution  adapter  (tailpipe extender)  shall be
     provided.   Multiple adapters may be used.

     e)  The  tailpipe  extender  shall  be  able  to  be attached  to the
     vehicle  within 60 seconds.

     f)  The tailpipe extender shall be designed to allow the attachment
     of  standard  service center  building  exhaust  evacuation systems
     without  affecting  the  vehicle or measurement  process.   The  pres-
     sure  at  the  end of  the  tailpipe or extender should  be within ±2
     inches of water of the  ambient barometric pressure.

     g)  The tailpipe extender shall not alter the sample and the mater-
     ial shall conform to D.3.c.) of this chapter.

     h)  The probe and  tailpipe extender shall have sufficient hardware
     (insulated handles,  etc.)  that will  allow  the user  to insert,
     attach,  or  remove the probe or the  dilution adapter  safely and
     conveniently.

     i)  The  probe or  tailpipe extender shall  be  designed  in  a manner
     that  will  prevent the probe or extender  from  being  removed from
     the vehicle unintentionally.

     j)  All  probes  should  have  a smooth  surface near the  probe tip
     before the flexible portion of the probe to be used for sealing of
     the span gas adaptor necessary for field or on-board leak checking
     (gas   comparison)  or  response  time  checking  equipment.   For
     standardization the  sealing  surface  should  be  Jg inch in outside
     diameter 'and % to 1 inch long.

6.  Sample Line

     a)  The sample  line  shall be sufficiently  flexible at the tempera-
     tures to be encountered during vehicle testing (See Section G)) to
     allow  normal  inspection  operations.   Pliability need  only  be
     demonstrated  at  the lower  operating environmental  temperature.

     b)  The  sample   line  shall not be longer than 25 feet nor shorter
     than  15  feet (excluding  the  probe).   For  standardization 20 feet
     is  preferred.

     c)  The  portion  of  the  sample line  in  contact  with  the exhaust
     gases shall  not alter the exhaust sample,  and  shall minimize HC
     hangup,   due  to absorption,  adsorption,  desorption,  outgassing,
     etc.

-------
                               26            Spec: D.6.c)-7.h)
     d) The  manufacturer must  state the  estimated  useful  life of  the
     sample line in the instruction manual.

7.   Analyzer Spanning System

     a) Minimum Gas Spanning Frequency;  The analyzer shall be  designed
     for routine gas spanning every  180 hours  (once per week).

     b) Recommended Gas Spanning Frequency:  It is recommended  that  the
     analyzer be gas spanned after:

          i) every "power on" and warm-up  sequence, and

          ii) every 4 hours of "power on"  condition when  testing.

     c) Minimum Electrical  Spanning  Frequency; All  analyzers  shall be
     electrically spanned every hour when  testing.

     d) Optional Spanning Frequencies;  Three  equipment  options may be
     substituted  for the  4 hour  recommended  gas  spanning frequency.
     (These options  may  reduce the  use of span gas).  Details  of  these
     options are found in subparagraphs m), n), and o) of this  section.

     e)  The  analyzer shall  be  routinely  spanned  with  flowing zero
     (purified room  air)  and  span gases.  A convenient  port for  peri-
     odic  (i.e.  audit)  spanning  with bottled  zero gas  shall  be pro-
     vided.  A separate  audit  port  for audit  gas shall  be provided to
     alleviate  the  necessity  to  disconnect the  span gas  in  order to
     perform  the  audit test.   The  audit  port should interconnect  the
     span system downstream of the span/zero switching valve.

     f) The  gas spanning  operation  must  allow the operator to easily
     correct  for changes  between the gas  span point  gain and the  elec-
     trical span point gain.  In all cases the electric span point gain
     is the  parameter that  must be  changed  such  that the new  electric
     span point gain setting  will cause  the analyzer to read  the span
     gas  properly.   For manual  operation, the manufacturer shall pro-
     vide a step by step sequence in the operators manual equivalent to
     the automatic system recommended for  decentralized units.

     g) If  the  analyzer  is equipped with  multiple ranges,  there  shall
     be convenient  access  for audit or  service personnel to adjust or
     trim  the scale  factor between  ranges.  When  trimming  the  scale
     factor,  start  on the highest range  and work down.   When  spanning
     the analyzer, start on the  lowest scale and  work up.

     h) When the analyzer  is initially  installed  at a new sight,  the
     analyzer span  gain for a proper gas span shall be  logged in  the
     analyzer's log  book.   A numbered span  adjustment knob may be used
     for  this purpose,  or  the physical  gain adjustment of  the  front
     panel  controls  may  be  limited  to  the values listed.  The  limited
     gain  control  option shall  include  visable reference to the  range

-------
                           7            Spec: D.7.i)-7.1)
of Initial adjustment and to the range approaching mandatory main-
tenance.   Generally  this  mandatory  maintenance  would   include
cleaning  of  the  sample cell.   Criteria:    If  the  adjusted  span
gain  for any  subsequent spanning  operation exceeds  140% of  the
initial  value  logged  in   the  book,  the  operation  manual shall
indicate  that  the  system  is approaching  a  mandatory maintenance
criteria.   The operation manual should  indicate operation of  the
analyzer  with  gain settings exceeding  150%  of the logged  initial
value constitute  improper operation  and  the  analyzer needs  repair.
The user  (State,  contractor, owner/inspector, etc.) is responsible
for proper operation of  the equipment.

i) The  span point  for  all  analyzers shall  be  between 70  and  100
percent  of  full  scale  on   the  lowest range.  For standardization
the preferred values are 1.5% CO and 600 ppm C3.

j) Appropriate valves,  switches,  and electrical  controls  shall be
provided  that will  allow the operator to conveniently  select zero,
span, or  sample gases, and  zero and  span the analyzer.

k) Determination  of Test Value.

     i) The  analyzer  shall  have a selector  switch or  button  (with
     indicator) labeled  "Sample" or  "Test".

     ii)  Activation of  the "sample" switch shall cause  the  ana-
     lyzer  system  to begin  integrating  or averaging  the  analyzer
     response  17  seconds after the  switch is  activated,.  and  con-
     tinue  integrating  the analyzer response  to a flowing sample
     for  the next 15 seconds.  The sample  and hold circuits can be
     either  analog  or digital.  Digital sample  rates shall be  at
     least  10 hertz.  An  optional  start  integration time is  de-
     scribed  in  Chapter VIII paragraph D.2.   The  option may  be
     used if the  criteria are met.

     iii)  The  analyzer  read-out  device  shall  display  the  inte-
     grated value,  and hold the display  until  reset.   An indicator
     light  shall  signal  the operator when the integrated  value is
     displayed.

1) Span cylinders

     i) For  stand alone  centralized  inspection analyzers (a condi-
     tion  determined  by the  State  or  Contractor)  and all decen-
     tralized   analyzers,   the  analysis  system  shall  include  a
     structure  for  safely  securing  two  "1A" or  "T" size cylinders
     (i.e.  160-200  cubic foot bottles) unless  the manufacturer has
     elected  to  use a different   cylinder size as  outlined  in
     Section B. on  gas cylinder specifications.   Appropriate  regu-
     lator^)  and lines  shall be provided for one dual blend  (HC
     and  CO in Ny) cylinder.  If the  system  includes a  C02  ana-
     lyzer,  regulator(s)  and  lines  shall  be   provided   for  one
     cylinder  of  C0? span gas.

-------
                          O Q
                                         Spec: D.7.m)-7.o)


     ii) For centralized systems utilizing multiple  analyzers  in  a
     single  location,  the analyzer  manufacturer need only  supply
     span  gas  and  bottled  zero gas  ports on  the analyzer.   The
     user  (i.e.  State or Contractor)  is responsible for the  span
     gas manifold system including lines and  regulators.

     iii)  Optional Span Cylinder Location;  An  analyzer manufac-
     turer  may  elect  to  not locate  the span bottles on the  ana-
     lyzer  structure  by  providing a  bottle cart  or  rack  to  secure
     the  span  bottle(s).   The bottle cart  must safely secure  two
     "1A"  or "T"  size cylinders  (unless other  bottle  sizes  are
     used).   Non-reactive quick  disconnect  connections  must be
     used  on the span  gas lines between the cart system and  the
     analyzer.

m)  Optional Spanning  System  la:   The  analysis  system may provide
temperature  and  pressure compensation  to the analyzer output  and
spanning  system.   The compensation  shall be  based on sample  cell
gas  pressure and sample  cell inlet  gas- temperature.   If   such  a
system  is used, and verified  by  subsequent checkout,  an  electrical
span check  may be  substituted  for the  "power  on" and 4 hour  gas
span  checks, but  not  for the  weekly  gas   span  checks.   During
analyzer checkout,  only  one   gas span check  is allowed as part of
the  initial analyzer  set-up   prior to the initiation of  the  entire
check  out  procedure.   An  electric  span shall be substituted  for
all  gas  spanning  operations   in  Chapter  XI  (unless   otherwise
noted).  Additional tests  will be required in  order to verify the
accuracy and  linearity of the compensation network  at the various
atmospheric pressures and temperatures  required by the performance
specifications (Chapter VII,  Secion  E).

n)  Optional Spanning  System  Ib;   A pressure  and  temperature moni-
tor  system  would  be considered  to be in compliance  with  the  pro-
vision  of  optional  spanning   system  la,  if the  system monitors the
sample  cell gas pressure  and inlet  gas  temperature  continuously.
If  these parameters  exceed  4  inches  H_0 and/or 10°F  difference
from the most recent  gas span, the analyzer would subsequently and
boldly  alert the operator  of the need  for  a new gas span check
(for manual  systems).  For decentralized systems,  the compensation
system  shall perform  as above as well as prevent  further  operation
of  the analyzer (unless the  computer automatically  gas  spans  the
analyzer without any  operator input).

o)  Optional Spanning  System  2;   The  basic accuracy  and  precision
of  the  analysis system may be significantly better than  the  speci-
fications  put  forth in this  document.   In such a case,  the  analy-
sis  system may be  capable of meeting the specifications of  this
document  without  any  pressure  and/or  temperature compensation of
the analyzer output and spanning  system.   If  such a  claim is made,
and  verified  by  subsequent checkout,  an electrical  span  check may
be  substituted  for  the "power on" and  4 hour gas span checks,  but
not  for the weekly gas span checks.  During analyzer check  out,

-------
                               29            Spec: D.8.-9.
     only one gas  span check is allowed as part of the initial analzer
     set-up prior  to  the initiation of  the  entire checkout procedure.
     An electric span  shall be substituted for all gas spanning opera-
     tions in  Chapter XI  (unless  otherwise noted).   Additional tests
     will be required  in order to verify  the  accuracy of  the analysis
     system  at  the  various  atmospheric  pressures   and   temperatures
     required by  the   performance  specifications  (Chapter VII, Section
     E).

8.  Analyzer Ranges

     a) Low-Range   :                 i) 0-400 ppmh HC
                                     ii) 0-2% CO

     b) High Range  :                 i) 0-2000 ppmh HC
                                     ii) 0-10% CO

     c) An analyzer may use one range for HC or CO corresponding to  the
     high  range  values  provided  that  the  low range portion (0-400,
     0-2%) meets all  of  the analyzer specifications as if  that portion
     were a separate  range.  During check out  of  the system the 0-400
     ppmh and 0-2% portions of the high scale shall be treated as a  low
     range scale.

     d) All  analyzer  read  out  devices  (digital  or  analog)  shall be
     appropriately scaled  and  capable  of reading negative  values up to
     -5 percent  of  full  scale for each range regardless of operational
     mode  (sample,  span,  leak  check,  etc.).   The  sample operational
     mode may  prevent negative readings if  a  diagnostic switch allows
     such readings  (negative ones) to occur for  diagnosis of analyzer
     problems.

     e) All  manufacturer's literature shall provide  an explanation on
     the difference between ppm propane and ppm hexane.  All formal or
     technical reports should clearly identify measured  HC results as
     ppm hexane.

     f) All  multi-range analyzers  shall have  range   indicating lights
     that clearly indicate which meter scale is to be  read.  The lights
     shall  be  of  sufficient  intensity  and color that will  allow an
     operator to identify  the range selection in  sunlight from a dis-
     tance of 15 feet.

     g) Additional  analyzer ranges may be used provided that they meet
     all specifications pertaining to the recommended  ranges.

9.  System Grounding

     a) All systems  shall  have a 3  wire power  cord with a  3 prong
     grounded plug.

     b) The manufacturer's  representative  should check  upon initial
     installation  to   insure  that  the  system  is  properly grounded to
     prevent ground loops  from interfering with the analyzer.

-------
                               30            Spec: D.10.
10.   System Vents

     a) No  restrictions  such as flowmeters may be placed downstream of
     any  analyzer  vent   (a  series  analyzer  flow  path  is  permitted)
     unless  the  system  can  detect potential  changes  in   restriction
     (i.e. sticking flowmeter), and

          i) alert  the operator  of the problem  which would require a
          new  gas  span   and/or repair  of  the  component  causing the
          restriction, or

          ii) use automatic compensation of  the analyzer  readout device
          for the change in restriction.

     b) A change in  restriction  that will  cause a  3 percent of  point
     change  in  the  analyzer response shall  activate the alert system.

-------
                                    31            Spec: E.I.-3
E.  Analyzer Performance Specifications

     1.   Calibration  Curve  Uncertainty   including  Bias  errors,  Precision
     errors, and Historesis (Per test procedure):

          a)   5% of point  (i.e. True value of reading).

          b)   Below 100 ppmh  HC or 0.40% CO the uncertainty specification
          need not apply.

          c)  If  the analyzer  prevents the  operator from  reading  below  10
          percent  of full  scale on  the  high  scale,  then  the uncertainty
          specification  need  not apply  to that  portion  of the high  scale.

          d)  If necessary  to  obtain the desired  accuracy at the low  end  of
          the CO scale, the uncertainty of  the CO calibration curve above  6%
          CO may be expanded to  10% of point.

     2.  Resolution:

          a) analog meters - 2.5% fs on each  range

          b) digital meters (last digit increment by  1)

               i) xxxx ppmh

               ii) x.xx% CO

     3.  Compensation:

          a)  Altitude compensation  (mandatory):   The  analyzer  shall have
          sufficient zero  and  span  adjustment to allow the spanning  of the
          analyzer  at  any  altitude  between  0 and  7000 feet.   The external
          span  adjustment   may  be  limited in  range as  long  as  a clearly
          marked internal adjustment will make up the difference.

          b)  Compensated  Systems (optional):  (For  systems  that  choose  to
          use pressure and  temperature compensation of  analyzer read-out and
          span system)

               i)  The  temperature  compensation  network shall provide  accu-
               rate  results over the ambient temperature range specified  in
               Section G of this chapter as well  as exhaust  gas temperatures
               up  to 49°C  (120.2°F).   (Units with  heated  sample cells are
               excluded from this requirement).

               ii) The pressure compensation network shall  provide accurate
               and  linear  results  (analyzer  read—out)  over  a pressure range
               of +  2  inches HgG  from the  local barometric pressure.  The
               system shall be  capable of  operation between  24 and 32  inches
               HgA.  Test points about which  the  pressure shall be varied  in
               order  to  ascertain  the accuracy and  linearity of the compen-
               sation network are 24.5, 28.5, and 30.0  inches HgA.

-------
                               32            Spec: E.I.-3
     c) Non-compensated Systems (optional):  For  those analysis systems
     that claim pressure and temperature compensation is not necessary,
     the analysis  system  shall be tested  to the  specification outlined
     in  step  b)   for  pressure  and  temperature  compensated  systems.

     d)  For optional  systems b)  and  c), all  testing  (unless noted)
     shall be  conducted  with those systems  (b  or c) active and opera-
     tional.

4.  Zero Drift:

     a) ±2% fs L.S. for 1 hour

     b) ±2% fs L.S. for 30 minutes if equipped with  automatic zeroing
     system (auto zero must be disabled for  zero  drift check).

5.  Span Drift:  ±2% fs L.S. for 1 hour.

6.  Noise (clean environment):  ±0.5% fs L.S. (Total 1% peak to peak)
                                (See Test  Procedure)

7.  Sample Cell Temperture:

     a)  It  is  preferred  that  the sample cell  and  gases  (sample  and
     span)  immediately upstream  of the sample  cell  be  heated.   If  the
     sample cell is heated the minimum  sample temperature shall,be 49°C
     (120.2°F).

     b)  If  the  sample cell  is  not  heated, the  analysis  system must
     compensate  for temperature  affects  on  the gas  (sample  or span)
     measurement process as in Section  3.

8.  Interferences

     a) Gases

                                                      Analyzer
                                             EC                    CO

          i) 14% CO.                     :  1.5%  fs L.S.        1.0% fs L.S.
                                       (RR  =  37500)*           (RR =  1500)

          ii) Saturated Water            :  1.5%  fs L.S.        1.0% fs L.S.
          @ 40°C (101°F)                 (RR  = 20,000)           (RR = 800)

          iii) 100 ppm NO,               :  1.5%  fs L.S.        1.0% fs L.S.
                                           (RR =  50)             (RR = 100)

     b) Electronic

          i) RFI                         :  1.0%  fs L.S.

-------
                                    33            Spec: E.9.


               ii) VHF                       : 1.0% fs L.S.

               ill) Induction                : 1.0% fs L.S.

               iv) Line Interference         ,: 1.0% fs L.S.

               v) Line Voltage and           : 1.0% fs L.S.
                  Frequency Variation
                    (90-130 v A.C.)
                       (59-61 hz)

               The  operation manual  shall  contain  an  easily identifiable
               warning recommending  against the  use  of portable generating
               equipment to  supply  power for the analysis system unless the
               user verifies  that  the  power generating equipment will main-
               tain the voltage and frequency within the above specification
               under  the  load conditions  experienced during  analyzer use.
               vi) Static Electricity        : 1 meter division or 2%% fs L.S.
                  (Analog meters only)         whichever is greater.  (Deter-
                                               mined at the lowest and dryest
                                               temperature used during the
                                               evaluation testing).
* RR = Rejection Ratio
     .,9.  Propane  to Hexane  conversion factor:  The  mean propane to hexane
     conversion  factor for  each analyzer  sold  as  a  pass/fail inspection
     analyzer shall be between 0.48 and 0.56 for
-------
                                                  Spec:  F.I.-5
F. Sample System Performance Specifications

     1.  Maximum Sample cell mean pressure difference
     -between gas spanning and sampling   : 4" H_0
     2.  Maximum sample cell
     Pressure variatiot
     (pump pulsations)
Pressure variation during sampling  : 6" H~0
     3.  Maximum sample cell mean
     pressure difference between normal
     flow and low flow indication        : 4" H_0

     4.  Response Time                   : 14 sec. maximum
     Inlet of probe to 95% fs L.S.   (@ low  flow indication)
     (See Test Procedure)

     5.  System Leakage:

          a)  The analyzer  shall  not be  used if  a leak(s)  exists in  the
          vacuum  side of  the  system that  causes  a measurement  error  of
          greater than 3% of the true sample value.

          b)  The pressure side  of the sample system shall  be leak free  as
          determined  by  a "bubble" leak-check method (not to  be  used  in the
          field).

          c) The vacuum side leak-check method shall  consist of a comparison
          of  the span gas  response'  introduced through  the  span network  to
          the response of the same span gas introduced through the probe and
          sample line.  In the future with demonstrated and historical  data,
          other  leak-check  techniques may be  accepted  or equivalent  to the
          gas comparison leak-check.

          d)  The analyzer manufacturer shall  provide a convenient system to
          introduce  the  span  gas  to  the  probe  in  a manner  such that  the
          pressure  in the sample  line during  leak-checking  is  equal  to  or
          slightly  below the pressure  occurring  in  the  sample  line  during
          testing.   It  is  preferred  that  the  leak checking equipment  be
          mounted on  the analysis  system structure.

          e)  The  analyzer  manufacturer shall   provide,  in  the  operating
          manual,  step by step  leak-checking procedures including  calcula-
          tions.

          f)  Gas comparison  leak-checks  on  the  vacuum side  of   the  system
          shall  be performed  every  180  hours (once a  week).   Abbreviated
          leak-checks  (e.g.  vacuum  decay,  etc.) may  be used  on  a  daily
          basis,  if  desired,  but not  as  a  substitute  for  the  weekly  gas
          comparison  test.

          g)  The  user (i.e. State,  or Contractor,  or  owner/inspector)  is
          responsible  for implementing  policies  and procedures to  insure
          that  the  leak-check  procedures  and frequencies  are  adhered  to.

-------
                              35
                                                       Spec: F.6.
6.   HC Hang-up:

     a) The HC  analyzer  response to room air sampled through the probe
     and sample  line shall be  less  than 20 ppm C6  prior  to testing a
     vehicle or the test is void.

     b) The analyzer manufacturer may provide an internal back flushing
     sequence or chemical  (or catalytic) purification equipment (i.e.,
     oil and  impurity  removal,  etc.) for external  compressed air back
     flushing in order  to  reduce the time  required  for hang-up check-
     ing.

     c) A  receptacle on  the analyzer structure may be provided for the
     HC hang-up check  to  preclude the probe  from  sampling room air in
     close proximity to the floor.

     d)  The  analyzer  manufacturer  shall  provide,  in the operating
     manual, step by step hang-up checking procedures.

     e) The operation  manual  shall caution the operator that an excess
     ively  long time  (5  to 10 minutes)  to  reduce  the hang-up level to
     below the 20 ppm C6 HC level indicates that system maintenance may
     be required.

     f)  The user  (i.e.  State  or Contractor)  is  responsible  for im-
     plementing  policies  and  procedures  to insure  that   the  hang-up
     procedures are conducted prior to every test.

     g) For evaluation  testing  only, the hang-up  level  should  be less
     than  20  ppm C6 within 10  minutes  of  beginning any hang-up check
     (including  2   hour  sample)  specified  in  the  evaluation tests.

-------
                                    36             Spec:  G.I.-2.
G.  Operating Environment

     1.   The  analysis system shall meet  all system specifications  required
     in  Chapter VII  under the  following conditions  (see Test  Procedure):

          a) Ambient Temperature:  Between 35°F  to  110°F

          b) Ambient Relative Humidity:

               ,i) Range of field operation:       0% to  100%  condensing
                                                  (i.e. raining or  dense  fog).

               ii) The user shall prevent direct  impingement  of condensed
               ambient moisture  (rain) on the analyzer  (i.e.  DO NOT LET  IT
               RAIN ON THE ANALYZER).

               iii) Range of Testing:    15%  to 85%

               iv) Maximum Test  Point;  80%  to 85%  RH @  105°F(±5°)
                                        WARNING:  Testing  in  environmental
                                                  chambers at relative humidi-
                                                  ties above  85%  with  tempera-
                                                  tures above 90°F  may be
                                                  HAZARDOUS to human life!  The
                                                  primary  hazard  is due  to heat
                                                  loading  on  the  human body's
                                                  cooling-system  "(i.e. perspi-
                                                  ration effectiveness)  leading
                                                  to heat  induced body dis-
                                                  functions.   Precautions should
                                                  be taken to avoid overexposure.
                                                  A secondary hazard is  a potential
                                                  electric shock  hazard  due to
                                                  the high moisture content of
                                                  the test cell.

     2. .  The  analysis system shall be  able  to be  stored  at  any  temperature
     between  -20°F  to 130°F with no  adverse effects  on subsequent  analysis
     system performance.

-------
                                    37

                                                       Spec: H.I.-2.
H.   Fail-Safe Features
     1.  Warm-Up
          a) The  analyzer must  have a warm-up  lock-out  feature with indi-
          cators.   No specific warm-up time is specified.

          b) The lock-out feature shall prevent operation of the printer  (if
          used) and read-out meter until the system is warmed up.

          c) The lock-out feature shall be activated:

               i)  When  system  power is turned on.   The  lock-out shall stay
               on until the zero drift is stabilized.  The manufacturer must
               condition  the  lock-out on  analyzer parameters,  and  may not
               use clock  time  as a sole criteria  to determine warm-up con-
               dition.  Verification  of  proper zero stabilization is deter-
               mined  by  observing  the  zero  drift  over  a  5  minute period
               after  the  lock-out  feature  deactivates.    The zero  drift
               during  this  5 minute  period may not  exceed  one-half of the
               zero drift specifications  in Section E.  If  digital  sampling
               of the  zero  level is used, the sample rate shall be  at least
               10 hertz.   Analog observation 'of  zero  drift  is permissible.

               ii) If  the sample cell is heated and the cell temperature  is
               less than that specified in section E.
     2. Low-Flow
          i) The analyzer must have a low sample flow indicator.   Inspecting
          a  vehicle when  the low  flow indicator  is  activated constitutes
          improper  operation.   The user  (i.e.  State,  contractor,  or  owner/
          inspector) is responsible to  insure proper operation.

          ii) The low flow indicator shall be activated when  the sample  flow
          rate  is  decreased  to  a point  that  would not  allow the analysis
          system to meet the response time specifications.

          iii)  The  low flow  indicator  shall be  prominently displayed, and
          shall be observable from at least  15 feet away.

-------
                                    38            Spec: I.




I.  System Correlation (on Raw Exhaust) to Laboratory Analyzers

     1.  All analyzers (comparison to NDIR Analyzer per Test Procedure)

          a) Precision .Test:  A P  £5%
          b) Slope Test:      0.95 <_ m <_ 1.05
          c) Ratio of Modal Ave:   0.90 < R  <1.10

-------
                                    39
                                                  Spec: J.I.-4
J.  Manuals
     1.  Each analyzer shall be delivered with one each of the following
     manuals.

          a) Easy Reference Operating Instructions

          b) Operation Instruction Manual

          c) Maintenance Instruction Manual

          d) Initial Start-up Instructions

     2.  The manuals shall be constructed of durable materials, and shall not
     deteriorate as a result of normal use over a five year period.

     3.  The easy reference operating Instructions:

          a) shall include brief step by step instructions for

               i) Gas Spanning

               ii) Electrical Spanning

               iii) Leak Checking

               iv)  Inspection testing with probe insertion, anti-dilution,
               HC hang-up, and reading test value instructions.

          b) may be stenciled or decaled to the analyzer  frame in a location
          convenient  to  the  operator,   may  be  printed   on  plastic flip-up
          cards attached by a ring or chain to the analyzer, or may use some
          other  communication  means  that  allows repetitive  and convenient
          use  of  the instructions  by  the  operator.   All  easy reference
          materials shall be attached to the analyzer.

     4.  The operating instruction manual must contain  :

          a) The analyzer model

          b) A  more detailed  step by step  sequence of  pre-test procedures
          (span, leak check, probe insertion, HC hang-up etc.)

          c) Sampling procedures

          d) The operating manual shall provide to the operator more insight
          into  the  specific procedures  than  the  easy reference  instruction
          are capable of because of their brevity.   It may be appropriate to
          include diagnostic instructions in the operating manual.

-------
                               40            Spec: J.5.-7
5. The maintenance manual must contain:

     a) Name,  address,  and  phone number of the manufacturer's customer
     service  and maintenance  center  at  the  home  office  and nearest
     field office.

     b) Name,  address,  and  phone number of  the nearest service center
     authorized to make warranty adjustments.

     c) A technical description of the system.

     d) A separate section that clearly outlines the required or antic-
     ipated  maintenance schedule.   The  schedule  shall  be  broken down
     into maintenance intervals such as weekly, monthly, etc.

     e) A  separate section  that provides a  step  by step sequence  for
     each maintenance requirement.

     f) A  list of replaceable items such as  filters, probes, etc. with
     part  numbers,  and  the estimated  service life of  each component
     (normal operation).

     g) A  list  of  recommended spare parts  that  the user should main-
     tain.

     h) Functional mechanical and electrical  schematics.

     i) The manufactuer's warranty provisions.

6. Each manual shall be attached  to  the analyzer in  a manner  that will:

     a) allow  convenient storage,

     b) allow  easy use, and

     c) prevent accidental loss or destruction.

7. The manufacturer's service representative  is responsible  for  logging
all repairs  performed  by the manufacturer or  their  representative with
appropriate  description in the log book.

-------
                                   41
VIII.  Additional.System Specifications Recommended for
       Decentralized Inspection Programs  (computer operation)

The  following  fail-safe  features  are specified in order  to prevent  improper
operation of analysis systems used for decentralized systems.  However, they
could be  useful  in centralized systems as  well.   In general  these  features
will • probably  require  an on-board  microprocessor.   When  using  a micro-
processor,  an alpha  numeric  keyboard  and  readout  may  be  substituted  for
various   switches,  buttons,   or   indicators  specified  in   the  following
sections.   Microprocessor  units may  also elect  to  print void test  results
instead  of  interlocking the  printer.  In  that  case, the  word "VOID" .must
prominently and/or  superimposed  over the data.  All valid test results must
clearly indicate  the validity of those results.

A.   Automatic zero/span check

     1.  The analyzer  shall not have  any  adjustments  available to the oper-
     ator  for adjusting  zero  or  span  point for  either the gas  spanning
     operation  or  the  electrical   spanning operation.    These adjustments
     shall be available in the anti-tampering box described in this  chapter.

     2. The analyzer shall have a selector switch or button  (with  indicator)
     labeled  "gas span".   Activation of  the switch shall cause the  analyzer
     to  automatically  perform  the  gas spanning  sequence with flowing zero
     and  span  gas consistent with the requirements  for  the manual  analyzer
     spanning system specified in Section D.7. of Chapter VII.

     3.  If  the analyzer  is equipped  with  multiple  ranges,  there  shall be
     convenient controls or automatic sequence available  to audit  or service
     personnel  to  adjust  or  trim  the  scale factor  between  ranges.    The
     adjustment shall be based on the analyzer's response to calibration  gas
     concentration values.  The concentration values shall be  between 70  and
     100  percent  of each  range.   When trimming  the  scale  factor,  start on
     the  highest  range  and  work down.   When spanning,  start  on  the lowest
     range and work up.

     4.  The analyzer  shall have a selector  switch  or button  with indicator
     light  labeled "electrical span".  Activation of  the switch  will cause
     the  analyzer  to  automatically perform  an electrical   zero  and  span
     operation  consistent  with the  requirements for  the  analyzer manual
     spanning system specified in Section D.7. of Chapter VII.

     5.  The automatic  gas spanning operation shall  be  completed  as  quickly
     as  possible  (preferably less than 90  seconds)  once the  "gas spanning"
     switch is activated.

     6.  The concentration  of span gas shall  be entered via switches  or other
     convenient means to the following resolution:

               HC = XXXX ppm propane
               CO = X.XX%  CO

-------
                              42
The  switches  or  interlock that  allows the entering  of the  span gas
values  shall  be in  an anti-tamper box as described  in this chapter.

7. When the analyzer  is  initially installed  at a  new sight,  the ana-
lyzer  gain for  a proper  gas  span shall  be  automatically  stored for
future  reference.  If  the adjusted span gain for  any  subsequent  span-
ning  operation  exceeds 150  percent  of  the  initial stored  value, the
analyzer readout shall  be electronically driven to 100% of full scale,
(or  an error message  displayed), the printer,  if  used,  shall be pre-
vented  from printing,  and an indication of. analyzer  malfunction  shall
be prominently displayed.  If the adjusted span gain for any subsequent
spanning operation  exceeds 140  percent of the stored value,  an  indi-
cation  to the operator of pending maintenance shall be provided.

8. If  the  adjusted  span voltage changes by more than 20 percent of the
most recent span voltage, the analyzer read-out shall be electronically
driven  to  100% of full  scale,  the printer if used shall" be prevented
from  printing,   and  an  indication of analyzer  malfunction  shall  be
prominently displayed.

9. The  analysis system shall include suitable timers to insure that the
spanning frequencies  are met.   The  timing, systems shall also prevent
use of  the analysis system by driving the readout devices to full  scale
(digital units  may  substitute  an error message for the analyzer  read-
ing) and prevent the printer from printing.  Performing the appropriate
spanning  operation  shall  automatically  reset  the  timer  for  that
specific type  of operation  regardless of the time elapsed since that
operation was  last  performed.   The options listed  in  the next Section
(Section B. Automatic  Leak-Check) may be used  in lieu of  a battery
back-up for "power-off" time keeping.

10.  The microprocessor system  shall  compute the equivalent hexane (HC)
span  set  point  based   on the  input   propane  value,   and  the analyzer
propane/hexane conversion factor.  The auditor shall have access to the
computed value.

11.  All features in  Section D.7.  of Chapter VII  shall apply  to the
automatic span system.

-------
                                      43
B. Automatic Leak-Check

     1. The sampling system shall have an automatic leak checking system for
     the vacuum side of the system.

     2.  The analyzer  shall  have a  timer that  will  allow  the  analyzer to
     operate for 180 calendar hours  (once per week) between  leak checks.  If
     after  180 hours  the system is  not  leak checked, or the system fails a
     leak check,  the  analyzer readout shall be  electronically driven to 100
     percent of  full  scale  (Digital units  may  substitute  an error message
     for  the analyzer reading),  and the  printer shall be prevented from
     printing.   The  following  options  are available  in  any  combination:

          i)  Option 1:  If  a full  leak check  is performed  every  time the
          power ,is  turned  on, and an operating  time  clock  insures that the
          leak check frequency is met in the event that the  power is left on
          continuously,  then  an auxilliary  power supply  (i.e.  battery) for
          the clock during power off  is not  necessary.

          ii) Option 2:  In lieu of  a real  time  clock with  battery back-up,
          the  system  may  count  the  number  of   times the  "power-on" switch
          (not the  stand-by  switch)  is turned on.  The weekly check will be
          assumed  to  have been  met if the  analyzer  system requires a leak
          check  (as specified)   after every 6 times  the  power-on switch is
          turned  on (i.e.  leak check begins with the 7th time of power on).
          An  operating time  clock  is necessary in  the event  the power is
          left on continuously.

     3.  Activation  of  the automatic  leak-check  system  shall cause the ana-
     lyzer  to  automatically perform  (or   check)  a  span  sequence,  auto-
     matically  introduce  span  gas   to  the probe,   compare the difference
     between  the span  and  probe readings,  and  make a pass or fail deter-
     mination.

     4.  A  leak-check  pass or fail indicator shall be prominently displayed.

     5.  All features  in Section F.5. of  Chapter VII apply  to the automatic
     leak—check  system.

-------
                                    44
C. Automatic Hang-Up Check

     1. The  analyzer  shall have a selector switch or button (with indicator
     light) labeled "Hang-up Check" or "Purge."

     2.  Activation of  the  "Hang-up"  switch  shall cause  the  analyzer  to
     automatically sample  room  air through the sample  line  and probe.  The
     "Hang-up Check"  system shall continue to sample  room  air until  the  HC
     response is less than 20 ppm C6.

     3. Any  combination  of sampling room  air  and/or internal  back flushing
     may be  used  to  achieve a  20 ppm C6 HC  level  when  sampling room air.

     4. When  HC level  stabilizes below 20 ppm C6,  a prominently displayed
     indicator shall  notify the operator  that it  is permissable to begin a
     test sequence.  The analyzer shall be precluded from beginning the  test
     sequence until the hang-up check is met.

     5. Activation of the "sample" switch shall  be prevented  unless  a  suc-
     cessful hang-up  check has  been performed since the  last  activation  of
     the test sequence,  and the HC analyzer has not experienced  an HC level
     greater than  20 ppm C6, or

     6. All  requirements  in Section F.6,  of  Chapter VII shall apply  to the
     automatic HC hang-up check.

-------
                                     45
D.   Automatic Read System

     1. The  analyzer  shall have a selector switch or button  (with  indicator
     light) labeled "Sample" or "Test".

     2. Activation of the "sample" switch shall cause the analyzer  system  to
     begin  integrating  or averaging the analyzer  response  17 seconds after
     the switch is activated, and continue integrating  the analyzer response
     to a  flowing  sample  for  the  next 15  seconds.   The sample  and hold
     circuits can be  either analog or  digital.   Digital  sample rates shall
     be at least 10 hertz.  If the manufacturer identifies that the response
     time  to  99  percent of a step change is  less than  17 seconds,  the manu-
     facturer may select any time between the 99 percent time and 17 seconds
     to begin the  integration.   If the manufacturer elects this option, the
     integration  start  time  must  be  boldly  visible  on  the  front of the
     analyzer.   Failure to meet  this  new response  time  during field audit
     checks will constitute a'failure of the  audit.

     3. The analyzer read-out device shall display the  integrated value, and
     hold  the display  until reset.   An  indicator  light shall  signal the
     operator when  the integrated  value is  displayed.  The automatic test
     sequence may interact  with  the  automatic  read  system to  reset  the
     display at appropriate times or within the test sequence.

     4. The  analyzer  shall be prevented from printing  the integrated value
     until  the   "sample"   switch   is  activated  and  the  "sample"  cycle   is
     completed.

E.   Dual Tailpipes

     1. The  system  shall  have the capability to automatically  calculate the
     average reading for dual tailpipes.

     2. The  dual  tailpipe system shall  use  integrated  test values  from the
     automatic read system for averaging.

     3. Activation  of  the dual tailpipe system  shall allow  two activations
     of  the  automatic  read  system  without activating  the  hang-up  check
     interlock.

     4. The dual tailpipe system shall  display the average value on operator
     command, and hold  the value until  reset.

-------
                                    46
F.  Automatic Test Sequence

     1.   The microprocessor  must  be  capable  of  being  programmed  for  the
     standard sequences listed in Table VIII-1.  These test sequences do not
     cover all  of the  possible  combinations  that may  exist.   On the con-
     trary, these sequences were limited in number specifically in an effort
     to standardize procedures and equipment.

     2.   The system  must  store  the  cutpoints for  each mode of  the test
     sequence used.   The  operator may only use  State accepted criteria  for
     selecting cutpoints.   It  is  recommended that the following criteria be
     used.

          a) Vehicle Model Year

          b) Type of Vehicle

               i)   Light-Duty Vehicle

               ii)  Light-Duty Truck

               iii) Heavy-Duty Gas Truck

          c) Spare Channel  (fuel type)

          d) Spare Channel  (Catalyst-non-catalyst, California-non-California)

     3.   Access  to the  test sequence programming,  and  cutpoint values  and
     applications  shall  be  limited  to State Auditor by  means of the  anti-
     tampering provisions in this chpater.

     4.  The system must identify the integrated value for each mode, make  a
     pass  or fail decision on that mode,  and  either immediately print  the
     results or store the results until the completion of the  test sequence.

     5.   If  the  test  sequence includes more than  one mode, the system  shall
     use the pass or fail decision  from all applicable modes to determine an
     overall pass/fail determination.

-------
                                    47
                                Table VIII-1

                         Recommended I/M and  207(b)
                              Test Sequences  *
                                         O O O O O O O O O Orr__4.    VC_J _ O O O O O O O O
                                                  "Test    Mode'
Test Type                               Non  Idle                  Idle

      **
Pre-81                                     -                     Pass/Fail
Post-81    (unloaded)                    2500  RPM,  Pass/Fail       Pass/Fail
Post-81 (loaded)                         30 MPH, Pass/Fail         Pass/Fail
*    Test sequences  may be preceeded by  any  type  of  preconditioning  desired
     if  the sequence  is performed  manually.  The Automatic test sequence
     feature in the  analyzer need  only  follow the  test  modes  described  after
     the test sequence  is initiated by  the  operator.
**   Pre-1981 model  year vehicles.
***  1981 and later  model year vehicles.

-------
                                    48
G.  Printer

     1. The  analysis  system shall have a printer that provides  the consumer
     and the  inspector  (not required with Automatic Data Collection  option)
     a receipt with the following information:

          a)  Date  (the  printer may use manually input values  for the date).

          b)  Inspection Facility Number or  Instrument  Serial Number (value
          may be input manually).

          c)  Inspection  Test  Number, (may  be  sequenced  by  initiation  of
          Automatic Test Sequence).

          d)  Applicable  cutpoints  or standards  for HC  and  CO for each  test
          mode.

          e)  Integrated vehicle  test values  for HC  and  CO  for  each  test
          mode.

          f)  An  overall pass  or fail  indication as well  as for each  test
          mode.

H.  Vehicle Diagnosis

     1. For the purpose  of vehicle  diagnosis and/or repairs,  the analyzer
     shall have a  selector switch or button  (with  indicator  light),- labeled
     "Vehicle Diagnosis" or "Vehicle Repair".

     2. Activation of  the  "Vehicle Diagnosis"  switch  shall allow the  ana-
     lyzer to continuously monitor the vehicle exhaust.

     3. The  printer,  or  any automatic  data collection  system,  shall lbe
     prevented from operating anytime the analysis system  is in a "Vehicle
     Diagnosis" status.

     4.  Auxilliary analog trend meters may  be  used  provided that they are
     deactivated for inspections.

I.  Anti Tampering

     1. The  anti-tampering feature shall be designed to prevent intentional
     tampering with the analysis system.

     2. All  switches  or entry access for  automatic  zero/span check  adjust-
     ments,  anti-dilution  limits,  span  gas concentration values, diagnostic
     switches, etc. shall  be contained in a box or other tamper-proof mech-
     anism with provisions  for an inspector's  seal.  A gummed  label with the
     inspectors  initials  and  date  which  must be torn  to  gain  access,   or  a
     braided  wire  and  crimped lead seal (or similar device) would be suffi-
     cient for sealing.

     3.   The  tamper-proof  system  must  allow convenient  access by  an  in-
     spector.

-------
                                49
System Diagnostic Testing

 1.  Switches or  other devices for rendering  any  fail-safe or automatic
 feature inoperative for the purpose of diagnostic or performance check-
 ing of the analyzer are permitted.

 2.  These  switches  (or devices)  must be  contained  In a tamper proof
 box(es) or  other  tamper-proof  mechanism  with  provisions for  a seal.

 3.  All  analyzer systems  must be shipped  with all  fail-safe and auto-
 matic features operating, and the defeat systems sealed.

-------
                                    50
IX.  Optional Features For The Inspection Analyzer

The optional features listed are intended to provide more capability, flexi-
bility,  or  convenience.    They  include  automatic  data  collection (ADC),
additional printer capability, anti-dilution equipment,  loaded mode  kit, and
an  engine tachometer.   The  first option  (ADC)  would  generally  require a
computer  operated  analyzer.   The remainder of the options are applicable to
both the  computer and manually operated analyzer.

A.  Automatic Data Collection

     1.   The  automatic data  collection  (ADC)  feature may  store  data on a
     magnetic cassette tape, magnetic disc, or other storage medium.

     2. Any external peripheral devices (phone line modems, external storage
     medium,  etc.) should have an RS232 port.

     3. Any  external transmission  of  data should be  coded  in ASCII with a
     maximum of 80 column records.

     4.  Other coding,  formating,   and  blocking  should  follow industry ac-
     cepted standards.

     5. The ADC  storage medium should  store  data on at  least 150 vehicles.

     6. The stored data shall be available only to an appropriate inspector,
     and  shall be protected by a seal  (see anti-tampering).

     7. A keyboard shall  be available  to allow the following types of data
     to be entered.  As indicated,  the  system may automatically  (Auto) enter
     certain data:

          a)  Date (Auto)

          b)  Vehicle license plate number

          c)  VIN

          d)  Vehicle type  (LDV, LDT, HDG, etc.)

          e)  Vehicle make

          f)  Vehicle model

          g)  Vehicle Model Year

          h)  Emission Family Number  (from emission  label)

          i)  Odometer

          j)  Fuel type (gasoline,  gasohol, methanol,  ethanol, propane,
          hydrogen,  spare channel,  etc.)

-------
                               51
     k)  Test Facility I.D. (Auto)

     1) Facility Inspection Test Number (Auto)

     m) Type of test.  (Initial test, first retest, second retest, etc.)

     n) Applicable cutpoints for HC and CO for each applicable test
     mode (Auto).

     o) Anti-dilution decision criteria (ie. air pump, no air pump,.
     etc.)

8. The processor shall enter the following data on the tape.

     1) Integrated vehicle test values for HC and CO for each test mode.

     2) An overall pass or fail indication for HC and CO as well  as  for
     each test mode.

-------
                                    52
B. [Deleted]

-------
                                    53
C.  Anti-Dilution  (Optional for all systems)

The  anti-dilution  feature  can  perform  three  useful  functions:   1)  most
important, it can serve as an indicator of vehicle exhaust  system  leaks that
would cause  the  measured  emission values  to  be lower;  2)  it can  he used  to
identify  dilution of  the  sample due to  either probe placement or tailpipe
extender  leaks;  and  3) it could potentially be  used  to insure decentralized
operators  actually  insert the  sample probe  (or attach  the extender), and
actually measure vehicle exhaust samples.

     1.   The anti-dilution  feature  shall identify  vehicle exhaust system
     leaks and sample dilution.

     2.  The preferred technique for identifying leaks  is monitoring the CCL
     levels  in the  exhaust.   Other techniques  that can demonstrate improved
     sensitivity  to leaks may be used.

     3.   At  least three  lower  limit  C0« values  shall be capable of  being
     used.

          a) no air pump

          b) air pump

          c) spare channel

     4.   The resolution  of the  C0« span  gas  values  entered shall be,  XX.X%
     cor

     5.   The CO, values  shall  be  entered by  switches or  other  convenient
     means.

     6.   The C09 analyzer shall meet  all of  the analyzer  specifications  in
     Chapter VI1 between CO  values of 6% and  14%.  (CO  interference speci-
     fication  does  not  apply).   Specifications  in  Chapter VIII apply  to
     computer analyzers.

     7.   If  the  CO- is less than the lower limit, the  analyzer  output  shall
     be  electronically driven  to  100%  of  full  scale  (digital  units may
     substitute  an  error  message for the analyzer reading), the printer  (if
     used)  shall be prevented  from printing,  and  an indication  of exhaust
     system  dilution shall be prominently displayed.

     8.   The analyzer  operator shall be able  to  select  one  of  the  three
     lower limits.

     9.   The analyzer  shall be prevented  from  reading auto  exhaust until one
     of the  three limits is selected.

     10.  If  a printer is  used,  the C0? limit  for the test  shall be printed.

-------
                                     54
D.   Loaded Mode Kit

The analyzer  specifications  in the previous  chapters  generally apply to an
analyzer used  for  unloaded or idle testing.   The analyzer designed  for the
unloaded test  can usually be transformed into  a loaded mode analyzer with
suitable changes to the sample handling system.   In some  cases  these  changes
could  possibly be retrofitted  in the  field  on  analyzers  originally manu-
factured as unloaded analyzers.  The following items should be  included in a
loaded mode analyzer.

     1. A  refrigeration or ice bath water  trap.  The water  trap must lower
     the sample gas temperature to 7°C  (45°F).   Suitable  measurement  devices
     and indicators must  alert the operator  on  the  status of  the unit.  No
     testing should be performed at sample temperatures above 7°C.  With the
     manual system, the operator is responsible  to insure that  this criteria
     is met.   The  computer analyzer would need  an interlock  with the sample
     gas temperature  measurement  device in order to  become  responsible for
     proper procedures.

     2. All components upstream of the  refrigeration trap must  be capable of
     running  continuously at  1000°F  inlet (to  the  probe)  exhaust tempera-
     ture.  Some  of  the equipment that would possibly require  upgrading for
     the   higher   temperature  would   include   the  tailpipe  extender  and
     connector, the probe, and the sample line.

     3.  The  loaded mode  analyzer may  require additional sample filtration.

-------
                                    55
E.  Engine Tachometer

The two  speed  idle test (see Table VIII-1) tneaures  emissions  at idle and at
an  elevated  engine  speed,'  usually  2500  RPM.,  The  standard  idle  emission
test,   in most  cases,  preconditions  the engine at  2500 RPM.   In  some  in-
stances, it may be beneficial to have engine  speed  measurement  capabilities
included within the emission  analyzer  system.   The tachometer  should  have
the following features.

     1.  The tachometer accuracy should  be  stated  in the maintenance manual.

     2.  For  "propane  gain" diagnostic  work,  tachometer accuracy should be
     ±30 RPM  between  400 RPM and  1200  RPM.  The  precision  or repeatability
     should be  5 RPM or less, and the resolution should  be  1 RPM.

     3.  The  preferred transducer  is a clip-on magnetic induction  pick-up.

     4.  The  computer operated emission analyzer  should monitor the engine
     speed during  the high  speed portion of the  two  speed idle test.  If the
     engine  speed exceeds  selected  limits during  the  test,  the  computer
     shall void  the test.

-------
                                     56
X.   Future Improvements for  the Inspection Analyzer

A. Introduction

During  the  development  of  these  specifications,  several areas  of  emission
analysis  were  identified  that should  be improved.   Improvements in  these
areas have  not been included  In the  specifications  (and  hence  do not  impact
State adoption of the recommended  specifications) because of  either  the cost
or  the  lead  time  required to  develop the  improved  technology.  The  staff
feels,  however,  that  those  involved  with emission  measurements should  be
aware of  the  need  for  these improvements.   The  following discussions  are
directed  mainly  at  the  analyzer  manufacturers  in  hopes of  stimulating  the
necessary developments or  improvements.   The staff  feels  such improvements
can be economically  feasible  by  1987.

B.  Improvements in  Water Removal

There are two forms of  emission measurements.   A  "wet-basis" measurement is
the form  the  exhaust leaves  the tailpipe  fully  laden with moisture  from the
combustion  of the  fuel.   Most NDIR  type emission  analyzers  cannot  accept
this moisture,  and  still operate  properly.   Unless  substantial improvements
or breakthroughs  are made  in  emission  measurement  equipment, it is  expected
that NDIR type analyzers will be  used  in the future.   Therefore, practical
systems must  provide a method for  removing the moisture before  it enters the
analyzer.   If absolutely  all of the water is  removed  from the  sample,  the
measurement becomes  a "dry-basis"  measurement.   The difference  between a wet
and a dry measurement of the same sample can be as  much as  10 percent (dry
is higher).

Practically all current  field analyzers use a momentum  type water trap.  The
moisture  removal  efficiency of this  type  of  trap ranges  from  0 to  100 per-
cent depending on  the ambient  temperature and  the  sample temperature.   Some
state inspection  lanes use a  refrigeration trap which  generally has a mois-
ture  removal   efficiency  between 98 to 100 percent.   In order  to allow for
these variations  in moisture removal  efficiency,  it  was  elected to  base the
1984 Federal  H.D.  truck idle  standard  on  a dry-basis measurement.   For this
same  reason,   it is  expected  that the projected  207(b) standards  would be
dry-basis values.

These  decisions  effectively  consider  all  I/M inspection  measurements  as
dry-basis measurements  even  though many may  not be.   In  order to eliminate
some of this  measurement variation in the  future,  it  is reasonable to  expect
that  all  measurements  be  taken on a truely  dry-basis.  Two techniques  are
suggested for dry  measurements.   The  first  is similar  to portions  of  the
loaded  mode kit.   Adoption of  this  improvement  would  be  to  remove  a  poten-
tial 7  to 10  percent variability  in I/M measurements.

Analyzers manufacturered after January 1987  should  include one  of  the fol-
lowing.

      1. A refrigeration or ice  bath  water trap.  The  water  trap must lower
     the  sample gas  temperature  to 7°C  (45°F).   Suitable measurement devices
     and  indicators must alert  the operation on the status of  the unit.  No

-------
                                    57
     testing should be performed at sample  temperatures  above  7°C.   With the
     manual system, the operator is responsible to  insure  that this  criteria
     is met.   The  computer analyzer would  need an  interlock with  the  sample
     gas  temperature  measurement device in  order  to become responsible  for
     proper procedures.

     2.  Electronic compensation.   Electronic  correction  to  a "dry-basis"
     reading  is permitted  if  the temperature  and pressure  of the  sample
     after the  water  trap is measured and  the sample  is assumed to  be satu-
     rated at the measured temperature.  The water  correction  system must be
     deactivated for  leak checks.

C.  Improvements in HC Measurement

Non-dispersive Infrared (NDIR) HC  analyzers used in I/M  programs are limited
in their ability to measure all of the hydrocarbons in the exhaust.  Current
NDIR analyzers  tend  to measure only straight chain paraffinic hydrocarbons,
although they do have some response to aromatics and aldehydes.  The lack of
response  to  these non-paraffinic  compounds is  the primary  reason  why  the
Federal Test  procedure  changed from NDIR HC measurement to FID (flame ioni-
zation detector) HC measurement 8  years ago (1972).

Even though  catalyst  vehicles tend to  produce  more paraffinic  hydrocarbons
than  non-catalyst  vehicles,   chromatographic  analysis  of gasoline-fueled
engine exhaust indicates  significant quantities of  the non-paraffinic  hydro-
carbons  exists  even  in  catalyst  vehicles.   The   very  same  compounds  that
current NDIR HC analyzers have difficulty in measuring.

Changes  in fuel composition  can  also affect  the  composition of  the  hydro-
carbons in the exhaust.   An increase in aromatics  components  in the fuel as
in unleaded  premium  gasoline will tend  to  increase the  aromatic , content of
the  exhaust  hydrocarbons.   A similar  situation occurs  with  gasohol  which
tends  to  increase the  content of aldehydes in  the exhaust  concentration.
Since  the NDIR  HC  analyzer has  poor  response  to  both aromatics and alde-
hydes,   the current NDIR analyzers will  generally  show  a  decrease  in  hydro-
carbons when the true hydrocarbon  content as measured by an FID would  gener-
ally remain about  the same.

Considering  these  facts,  one may question  the necessity or the wisdom of HC
measurements with  an  NDIR analyzer in an I/M program.   Even though  the NDIR
HC analyzer  does  not measure all of  the  HC  in  the  automobile  exhaust,  a
reduction  in  the paraffinic hydrocarbon levels can in many cases  be indica-
tive  of .a reduction  of  the  other  classes of  hydrocarbons.   Further,  the
criteria  for  determining  State cutpoints is the number  of vehicle failures,
and  the  reduction  of just  the paraffinic hydrocarbons  from the failed vehi-
cles still contributes to a reduction in ambient air hydrocarbons.

One  may  also question why  an  FID  is not specified in  the first place.  The
reason  is that  an FID  is a complex piece  of  laboratory  equipment  that re-
quires  a mixture  of  hydrogen  and  helium for fuel, and purified air  for an
oxidizer.  At  this point, the staff is somewhat skeptical about the compat-
ability of current FIDs in  an  I/M  test environment.

-------
                                     58
In  the  past  there  has been  no incentive  to improve the  field  measurement
techniques  for HC measurements.   Considering  the  possible impacts of  fuel
switching and  the fact  that if  a program  continues  past  1987 the  program may
not  be  as  effective  as predicted  in the SIP,  the staff feels  that  the HC
measurement techniques  should be improved.

The  improvements can be accomplished  through  better response characteristics
of  current NDIR's,  or  new  less  complex  HC measurement   techniques  could
possibly be developed.   In order to  provide  an incentive  for  this  advance-
ment  in  technology, beginning  in January  1987,  it is recommended  that all
I/M  analyzers correlate to  an FID HC  analyzer by the procedures provided.
To  assist  in  the degree of correlation that is  technically feasible, it is
recommended during  the  verification  of current  analyzer  performance that an
additional  test be performed  that  compares  the  I/M HC  analyzer to an  FID.
Review  of  the  NDIR/FID  correlation data  generated by  the  accreditation
procedures  is recommended  prior to the implementation of  the  1987  specifi-
cations.

Analyzers  produced  after January 1,  1987 should correlate  to  an FID  in the
following criteria  (see Test  Procedure):

      1. Precision Test:             A  p    <_ 5%

      2. Slope Test:           0.317 1  m  1  0.350

      3. Ratio of Modal Ave:    1.80 1  R  1  2.20

-------
                                   59
XI.  Evaluation Procedures

The  test  procedures  in  this chapter are  presented  to provide a  consistent
interpretation of  the specifications.  Although  the procedures do  provide  a
step by  step  sequence,  and  it  is expected  that the evaluator follow  that
sequence;  they are not  a  substitute  for  common  sense  or good engineering
judgment.  Some  analysis system designs may  simply  not  be amenable  to  cer-
tain portions  of  certain  test procedures.   Further,  there  may  be ways to
simplify or  combine certain  test  procedures.   In  those cases,  the  evaluator
should review  the procedure  as written, determine the important conceptual
aspects and  parameters of  the procedure,  and then use engineering judgment
in testing the analyzer.

The basic test procedure should be performed  in  a laboratory  that has  exper-
ience  in  automotive  emission testing.   The  general  testing should be  con-
ducted at  an ambient  temperature  between  68°F  and 86°F.   Section G requires
certain  test  procedures  to be  conducted at  other  ambient  temperatures.

If  either  of  the  non-gas  spanning alternatives  are  used (See Chapter  VII,
Section  D.7.),  only   one  gas span  operation  is permitted  for  the  entire
Chapter  XI  procedure, unless  otherwise  noted.   This  single gas spanning
operation  shall   take place  during  the initial  start-up procedure.   Elec-
trical  span  will  be  substituted for  all  other gas  spanning operations.
Analytical gases,  of  course, will be required  for check  out  of the  system.

The  procedures as written  are generally independent  of  tolerance  specifica-
tion values.   Following  each  test  procedure,  a  reference  value corresponding
to  the. values  given  in  Chapter VII  through X will be given  in parenthesis.

-------
                                   60             TP:A.
A.  Traceability of Analytical Gases

The traceability  of  analytical gases may or may not be part of  the analyzer
manufacturer's  responsibility.   The choice belongs  to the state.  However,
it  is  recommended  that the analyzer manufacturers  not be held  responsible.
Further, gas  manufacturers  should meet certain performance standards and be
accredited as acceptable vendors, or the state should  provide a  distribution
service.

The traceability  of all gases  used in the I/M program  is of course impor-
tant.    Traceability  implies  not  only  blending,   but analyzing  the  gases
properly.  Although  operating the  analysis equipment  properly  seems like  a
trivial  task,  some very  prominent laboratories have  sometimes been embar-
rassed  by  subsequent  review  of  their  procedures and  analysis  of  their
blended gases.

In  order  to  provide the automobile manufacturers  with what EPA/OMSAPC con-
siders  proper  traceability  procedures,  the  Emission   Control Technology
Division (ECTD) of EPA is publishing a Recommended  Practice for  Assuring Gas
Traceability to NBS.  This procedure, which is a compilation of  internal EPA
procedures, is applicable to I/M  analytical gases.

The entire traceability procedure  may involve more  equipment  than a  state
may'wish  to  become  initially  involved with.   A  minimum recommendation for
I/M programs is  that  each  gas  blender or  certifying  laboratory  that is
allowed  to supply gases  for pass/fail  I/M systems  should  follow the ECTD
procedure.  The next  step would  be a  continuing quality-audit  of each sup-
plier  by  the state using the correlation portion of the  traceability proce-
dure.

-------
                                   61             TP:B.
B.  Gas Cylinder Specifications




No test procedures required.

-------
                                   62             TPrC.l.
C.  Durability Test Procedures

     1.  Vibration and Shock Test Procedure

     The  vibration and  shock  test procedure  is designed  to evaluate  the
     ability of the analyzer to tolerate moderate  use  in  a  service  facility.
     Although a simple span test is performed,  the real  test  of  the analyzer
     is the ability of the analyzer to meet  the  remaining performance checks
     to follow this test.

          a) Equipment Required

               i) Candidate instrument.

               ii) One  span  gas between 70  and 90 percent of  full scale on
               the low range, and bottled  zero  gas.

               iii) A  special  test floor  6  feet by  10 feet.   The top of the
               floor shall be elevated 2 inches  off  the  test  facility floor.
               The  floor  shall  consist of  an  expanded  metal grating  with
               diamond  shape  openings measuring  1  x  3.7 inches or equiva-
               lent.  The  length of the floor  in the direction of the "short
               way of the diamond" shall be  10  feet.

          b) Test Sequence

               i) Warm up  the analyzer.

               ii) Span  the  analyzer on the low range with the  span gas per
               the  manufacturer's  recommendations   (on  the  test  floor).

               iii) Record the zero response and the span response.

               iv) Roll  the  instrument the  entire length of the test floor
               in  the  direction  of the "short  way of the  diamond", and off
               the end of  the test  floor onto  the facility  floor.

               v) Pull the analyzer back onto  the test floor.

               vi) Repeat  steps iv) and v) a total of  six times.

               vii) Check  the zero  response, and if  necessary adjust the zero.

               viii) Check the gas  span response  (do  not adjust,the analyzer
               span).

               ix) Record  the zero  response  and the  span response.

          c) Calculations

               i)  Subtract the zero response from the  span  response in step
               b)  iii)	(span before).

-------
                          63              TPrC.l.
     ii) Subtract  the  zero  response  from the span response In step
     b) viii)	(span  after).

     ill)  Subtract the  value calculated  In step c)  ii)  from the
     value calculated  in  step  c)  i)	(span shift).

d) Acceptance Criteria

     i)  If the value  calculated  in step  c iii) is  less than or
     equal  to  the vibration  and  shock  span  shift specifications,
     then  the  vibration  and  shock  performance  is  acceptable.

     ii) Reference value:   2%

-------
                              64             TP:C.2.
2. Sample Line Crush Test Procedure

The  sample  line  crush  test is  to  be  repeated  under the  "operating
environment"  testing.    If  space  is  a problem in  the environmental
chamber, after  stabilization,  the sample  line  can  be removed  from  the
chamber  to perform the  crush test.   If the  line  is removed  from  the
chamber, the  crush test must be performed and  the  line  returned  to  the
chamber within 3 minutes.

     a) Equipment Required

           i) Candidate instrument.

           ii) One span gas between 70 and  90 percent  of  full  scale on
           the low range, and bottled  zero  gas.

           iii) One vehicle with at least 4000 pound curb weight.

     b) Test Sequence

           ±) Stabilize the sample line at  the prevailing ambient
           temperature.

           ii) Warm up the analyzer.  Do not turn on the  sample  pump.

           iii) Span the analyzer with the  analytical  gases.

           iv) Leak-check the system.

          v) Stretch out the sample  line across a solid  (concrete etc.)
           floor.

          vi) Drive across the sample line so  that  at least one front
          and one rear vehicle wheel passes over the  sample line.-

          vii) Back over the sample  line so that at least one front  and
           one rear vehicle wheel passes  over the sample  line.

           viii) Repeat steps vi) and vii)  twice.

           ix) Leak-check the system.

           x) Check for "low  flow" indication.

           xi) Check for visible failures,  kinks,  deterioration, etc.

     c) Calculations
           (none)

     d) Acceptance Criteria

           i)  If the system  passes  the  leak  check (step ix),  does  not
           indicate a  "low  flow" condition  (step x),  and shows no sign
           of  permanent  deformity   (step  xi),  then  the   crushability
           performance of the sample  line is acceptable.

-------
                              65             TP:C.3.
3.  Sample Handling Temperature Effect

     a) Equipment Required

          i) Candidate instrument with tailpipe extender.

          ii) Catalyst equipped vehicle.

          iii) Thermocouple read-out device.

          iv) Type "J" or type "T" thermocouple (1/16 inch diameter
          MgO shielded and grounded).

          v) One HC span gas between 70 and 90 percent of full  scale
          on the low range, and bottled zero gas.

          vi) Associated fittings.

     b) Test Sequence

          i) Locate a  point approximately 1 inch upstream from the end
          of  the  probe,  and  weld a thermocouple boss  on the  extender
          (top side when installed on vehicle).

          ii) Install  the  thermocouple into the extender to a  distance
          approximately  half-way  between  the extender  wall  and the
          sample probe.

          iii) Warm up the analyzer.

          iv) Span the analyzer with the analytical gases.

          v) Leak check the system.

          vi) With the  vehicle  running,  locate  a position  away from
          the  vehicle  to  avoid  vehicle  contamination,  and   measure
          the  background  HC  levels  with  the sample  system.   Record
          the background HC levels.

          vii) Install the extender on the vehicle.  .

          viii) Adjust the vehicle to elevate the exhaust gas  tempera-
          ture  (as measured  by  the   thermocouple)  to at  least  300°C
          (572°F)and not more than 360°C  (680°F).

          ix) As  soon  as the exhaust  gas  has  stabilized  between  300°C
          and 360°C, start a timer and begin sampling.

          x)  After  twenty  (20)  minutes  at  the  temperature  in step
          viii), remove the probe or extender, and simultaneously  start
          another  timer.

-------
                         66             TP:C.3.
     xi) Immediately  move  the  probe or  extender to the  location
     previously used to measure .background HC, while  continuing  to
     sample room air and simultaneously start  a  timer.

     xii) Continue  to  sample room air until the  analyzer  response
     is 20 ppmh.  Record the elapsed  time to 20  ppmh.

     xiii)  Introduce  zero  gas  into  the  analyzer through the gas
     spanning system.  Record the response.

     xiv)  Introduce span  gas   into  the  analyzer  through  the gas
     spanning system.  Record the response.

     xv) Leak check the system.

     xvi) Check for "low flow"  indication.

     xvii)  Check  for visible  failure,  melted  or deformed  parts,
     deterioration etc.

     xviii) When the testing is completed, remove the thermocouple
     and cap the boss with a leak proof cap.

c) Calculations

     i)  Compute the difference in  span  response between step  b)
     xv) and b) iv) 	 (span drift).

d) Acceptance Criteria

     i) The value computed  In c) i)  must be  less than the  span
     shift specifications.   (Reference value:  2%).

     ii) The system must pass the leak check.

     iii) A low flow condition  shall  not be  indicated.

     iv) No portion of the  system shall show signs  of heat damage.

     v) The elapsed time recorded in  c)xii)  shall be  less  than  the
     HC hang-up specifications.  (Reference  value:  10 minutes).

     vi) If the above criteria  are met, then the high temperature
     performance of the system  is acceptable.

-------
                               67              TP:C.4.
4«  Filter Check and Hang-up Test Procedure

The filter check procedure consists  of  two phases  -  a  2  hour  check,  and
a  check  to determine  the useful  life of  the filter.  It is  intended
that all  subsequent  system check procedures are to  be conducted  with a
filter  and sample  system  that  have  experienced  at  least  2 hours  of
exhaust  sample as  defined in  this procedure.  Therefore,   the  second
part  of the  filter  test  may  be performed  after the other  tests  are
complete  if  a  log  of sampling  time during  the  other  tests is  main-
tained.  If during subsequent testing,  a  low flow  Indication  occurs  due
to filter loading, the filter may be changed,  the  filter life recorded,
and testing may continue with a new filter.   After 20  hours of  sample
through one filter, the test may be  discontinued.

     a) Equipment Required

          i) Candidate instrument.

          ii)  Test  vehicle that can create  a  hydrocarbon sample  of at
          least  1500  ppmh with a spark  plug  wire  removed or the choke
          partially closed.

          iii)  Clean sample filter.

          iv)  One  span gas between  70  and  90  percent of  full  scale on
          the  low range,  and bottled zero gas.

     b) Test Sequence

          i) Install a clean sample  filter.

          ii) Warm up the analyzer.

          iii)  Span the analyzer with  the analytical gases, and  leak
          check the system.

          iv) With the vehicle running,  locate a position away  from
          the vehicle to  avoid vehicle  contamination,  and  measure
          the background  HC levels  with the sample system.  Record the
          background levels.

          v) Attach the tailpipe extender to the vehicle.

          vi)  Insert the  probe into  the extender and begin sampling.

          vii)  Begin the  vehicle malfunction.

          viii) As soon as  the emissions  exceed 1500 ppmh, begin  a timer.

          ix) Maintain the HC level  above 1500 ppmh, and sample  the
          vehicle for  two (2) hours.

-------
                         68             TP:C.4.
     x) During the two hours monitor the "low flow" indication.

     xi) After two hours, remove the prohe or extender, and  simul-
     taneously start another timer.

     xii) Immediately  move  the probe  or  extender to the  location
     previously used  to measure  background EC.   If  the  analyzer
     has an  HC hang-up  check  cycle,  immediately begin the  check
     cycle.

     xiii)  Continue to sample room air until the  analyzer  response
     is 20 ppmh.  Record the elapsed time to 20 ppmh.

     xiv) Introduce zero  gas  into  the  analyzer  through  the  gas
     spanning., system.  Record the response.

     xv) Introduce span  gas  into  the  analyzer  through  the  gas
     spanning system.  Record the response.

     xvi) Leak check the system.

     xvii)  Alternatives:   1)  at this  point the filter  testing  may
     be  suspended  in  order  to complete  the  other  tests.  A  log
     book of sampling  time must be kept for the other tests,  or 2)
     reinsert  the  probe into  the extender,  and  continue testing
     until  the  "low flow"  system activates or  until  20  hours  of
     sample time is reached (whichever occurs first), or 3)  repeat
     the 2 hour filter check at the end of  the performance testing
     of  the  analyzer,  then continue testing  until the "low  flow"
     system or 20 hour criteria~are met.

     xviii)   Record  the elapsed time to  "low  flow" indication  (if
     appropriate).

c) Calculations

     i)  Compute  the difference  in span  response between step  b)
     xv) and b) iii) 	 (span drift).

d) Acceptance Criteria

     i)  The  value  computed  in c)  i)  must be  less than  the  span
     shift specifications.  (Reference value: 2%).

     ii) A  low flow  condition shall  not  occur  during  the  2 hour
     check.

     iii) The  elapsed  time  recorded  in  c) xiii),  shall  be  less
     than the HC  hang-up  specifications.    (Reference  value:  10
     minutes).

-------
                    69             TP:C.4.
iv)  If  the above  criteria are  met,  then the performance  of
the filter is acceptable.

v) If  the  total elapsed  time  to "low  flow" activation  is not
less than  70  percent of  the analyzer  manufacturer's  estimate
of  sample  life-time of  the  filter,  the manufacturer's  esti-
mate  is acceptable.   If  the  elapsed time is  less  than  70
percent of the  estimate,  the manufacturer's estimate  shall  be
revised downward.

-------
                                   70             TP:D.l.-6.
D.   Design Requirement Inspection and Test Procedures

     1.   Useful Life;  No test procedure.

     2.   Name Plate:  Visual observation.

     3.   Sample System;

          a) Visual observation.

          b) Visual observation.

          c) Visual observation.

          d) See "Analyzer Gaseous Interference and Noise Test Procedure,"
          Chapter XI, Section E.8.

          e)   i) Statement by analyzer manufacturer on partical  size and
               element lifetime.

               ii) See "Filter Check and Hang-Up Test Procedure."  (Chapter
               XI, Section C.4.)

     4.   Sample Pump;  No test procedure.

     5.   Sample Probe;  Test procedures self-explanatory or  features can
          be determined by visual observation.

     6.   Sample Line;

          a)  Flexibility Test  Procedure:   Perform the normal  motions re-
          quired to  use  the  sample line for testing vehicles.  Perform  this
          test  at  the lowest  environmental temperature  used for check out
          under  Chapter  XI procedures.  Make  a determination about whether
          the  sample  line  can be used without  a great deal of difficulty at
          the condition tested.  If it is determined that the sample line is
          not  sufficiently  flexible,  then the  manufacturer may suggest  more
          objective  test procedures  and/or more data to demonstrate compli-
          ance.

          b) Self-explanatory Test Procedure.

          c) Visual observation.

          d) Statement by analyzer manufacturer.

-------
                                             TP:D.7.-10.
7.   Analyzer Spanning System Test Procedure;    The   performance  and
acceptance of  the  spanning system will generally  be  determined by the
system's performance  on  the other test procedures conducted during the
evaluation  procedures,  and  visual  observation  of the  equipment fea-
tures.  In  other  cases  (such as event timers), the test procedures are
self-explanatory,  and are not listed.  The evaluation of the test value
integration  will  take  place as  part  of the  correlation  testing  in
Section I of this chapter.

8.   Analyzer Ranges;  Visual observation.

9.   System  Grounding;   Visual observation  and manufacturer's  instruc-
tions to service representatives.

10.  System Vents; If restrictions  downstream of  the analyzer  exit are
apparent,  a test procedure shall be devised that evaluates the  analyzer
performance under restricted conditions.  Test Procedures E.3.a)  (Alti-
tude Compensation) and  F.I. (Sample Cell Pressure Variation, Low Flow,
and Response Time) shall be used for guidance.

-------
                                    72             TPrE.l.
E.  Analyzer Performance Test Procedures

     1.  Calibration Curve Test Procedure

          a) Equipment Required

               ±) Candidate instrument

               ii) Seven or more calibration  gases  for  each  range  of each
               analyzer roughly equally spaced over each  range.

               iii) Zero gas

               iv) Associated valves and fittings

          b) Test Sequence

               i) If necessary, follow the manufacturer's instructions  for
               initial start-up and basic operating adjustments.

               ii) Warm up the analyzer

               iii) Zero the analyzer with the zero gas

               iv) Span the analyzer with one of  the calibration gases.   The
               span point  should  be approximately  80 to  90 percent  of  full
               scale of the low range

               v) Recheck  the  zero.  If the  zero has  shifted, repeat  steps
               iii), iv), and v) a maximum of one more  time.

               vi) Do  not  adjust the zero or span  controls on  the analyzer
               for the remainder of the test.

               vii)  Introduce  the  calibration  gases  in  ascending  order of
               concentrations  beginning  with  the  zero  gas.   Record  the
               analyzer response to each concentration  value.

               viii) After the highest concentration has  been  introduced and
               recorded,  introduce the  same  calibration  gases  to  the  ana-
               lyzer  in  a descending order.  Include the zero gas.  Record
               the  response  of  the analyzer to  each  gas.  Record negative
               zero  responses   (if  any)  as  they occur as negative  values.

               ix)  Repeat steps  vii),  and   viii)   a total  of  five  times.

          c) Calculations

               i)  For hydrocarbon  analyzers, compute  the hexane  equivalent
               (ppmh)  of  each  calibration  gas  by multiplying  the  concen-
               tration  value  in  ppm  propane (ppmp)  by   the  propane/hexane
               conversion factor listed on the analyzer.

-------
                         73             TPrE.l.
     ii)  Compute  the  standard  deviation(s)  and  mean(x)  of  the
     analyzers  response  for  each  concentration   of  calibration
     gases.   Include  both  upscale  responses and  downscale  re-
     sponses to  the  same calibration gas.   Zero may be a  special
     case and not amenable to the  calculations.

     iii)  For  all concentration values  except the highest value,
     multiply  the standard  deviation(s)  by a factor (K)  of  2.5.

     iv)  Multiply  the  standard  deviation(s)  of  the  analyzers
     response  to  the  highest concentration  by a K factor  of  3.5.

     v) Compute the following for  each concentration

          1) y. = x + Ks

          2) y2 = x - Ks

     vi)  Compute the uncertainty(U)  of  the calibration curve  for
     each concentration by:

            _ concentration  value-y      1__
              concentration  value

    where i =  1, or 2    U ±

d) Acceptance Criteria

     i) Identify  the maximum uncertainty  for each  range.

     ii)  If  the  maximum uncertainty  is  less than  or equal to  the
     uncertainty  specification   (Chapter  IV,  Section E),  (plus  or
     minus),  the calibration curve  is  acceptable.  If the uncer-
     tainty  is greater  than specification, the calibration  curve
     is not  acceptable.   (Reference values: 5% of point above  100
     ppmh  and  0.4% CO,  10%  of point  above  6%  CO is  permissable  if
     necessary)

     iii)  If  the calibration curve  is not  acceptable,  then  the
     instrument manufacturer should undertake  an engineering  study
     to  identify  the  cause of   the  problem   prior  to continued
     testing  or  introduction  of  the analyzer  to the commercial
     market.

     iv)  After  the  cause  of the problem  is identified   and  the
     analyzer  is  repaired   or  adjusted  this  test  should be  re-
     peated .

e)  Repeat steps  b),  c), and  d)  for  each  range  of the analyzer.

-------
                              74
2.  Analyzer Resolution

     a) Analog Meters: The resolution is determined by the interval of
     the smallest graduation of the meter face for each analyzer range.

     h) Digital Meters: The resolution is determined hy the  increment
     of the least significant digit of the meter readout for each
     range.

-------
                              75             TP:E.3.a.
3.  Compensation Test Procedures

     a) Altitude Compensation Test Procedure   (not  required  for  analyzers
     with Spanning Alternative, 1 or 2)

          i) Equipment

               1) Candidate instrument.

               2) One pressure gauge or manometer that  reads in  absolute
               pressure (e.g. 20 to 32 in. HgA) with  1% accuracy.

               3) One differential pressure gauge (0  to 15  inches  of
               water).

               4) One flowmeter (0-20 cubic feet per  hour  (CFH)).

               5) Two needle valves.

               6) One vacuum pump (greater than 20  CFH@ 24  in. HgA).

               7) One span gas 70 to 90 percent of  full scale on the  low
               range.

               8) One Tedlar sample bag.

               9) Associated lines and fittings (non-reactive)".

          ii) Test Sequence

          This  procedure  is  written  around   parallel  HC  and   CO  ana-
          lyzers,  and   should  be  performed  on each  analyzer.   If the
          analyzers  are in a  series  configuration,  then an additional
          pressure  gauge (s)  will  be  required,  but  the   test  can  be
          performed on both analyzers at  the  same time.

          If  the  analyzer manufacturer states  in  writing  that the
          structural  integrity of  the  sample cell will  not withstand
          the pressure differential associated with this test procedure
          at  24  inches  of  HgA,  the altitude  check must  be made  in  an
          altitude chamber.   In  an altitude  chamber  only steps  8), 9),
          10), 14), 15), 16) and 20) need be  performed  at the pressures
          specified in step 13) and 18).

               1)  Identify  the sample line entering  the sample  cell  of
               each analyzer.

               2)  Install  a tee fitting  in the sample  line immediately
               upstream  of the  sample  cell   (as close as  practical).
               Install  the  tee with branch pointing up.

               3)  Immediately  upstream  of  the tee install one of the
               needle valves.

-------
               ..,             TP:E.3.a.)
               / o
4)  Identify the  exhaust  line  from  the sample  cell  and
install  two tees  or  a 4-way  cross  fitting in  the  line
with the branches  pointing  up.

5)  Downstream  of  the  tees  or  cross  fitting install  the
flow meter.

6)  Attach  a  differential   pressure  gauge to  the  tee
upstream of the sample cell and  one  of the  exhaust tees.
Attach  one gauge  across  each  analyzer in  a series  sys-
tem.

7)  Attach  the absolute  pressure  gauge to  the  second
exhaust tee.

8) Warm up  the analyzer.

9) Check for leaks.

10)  Sample  room  air  through  the sample  line  with  the
needle valve wide  open.

11)  Record the sample cell exhaust  flow rate,  the  dif-
ferential  pressure across  each analyzer,  and the abso-
lute pressure.

12) Attach the second needle  valve  after the  flowmeter.

13) Adjust both  the needle valves to  obtain an  absolute
pressure  of 31  inches of  HgA,  the sample differential
pressure  recorded in  step   ii),  and a flow-rate  of  not
less than  2 cfh.

14) Fill the sample bag with the span  gas,  and introduce
the span gas from  the  bag into the sample line.

15) Use the analytical gases to set  the zero and span of
the  analyzer.    Note   if  internal adjustments  were  re-
quired  to  span the analyzer.

16) Return  to  sampling room air.

17) Attach  the vacuum  pump  to  the exhaust line after the
second  needle  valve with an appropriate length  of line,
and open both needle valves.

18)  Turn  the  vacuum  pump   on,  and  adjust both  needle
valves  to  obtain  an  absolute  pressure of 24 inches of
HgA,  the  same differential pressure  recorded  in  step
11), and  a flow  rate  approximately  the same  as  recorded
in  step 11).

-------
                                   TP:E.3.a.)
     19) Refill  the sample  bag  if  necessary, and  introduce
     the span gas into the sample line  from  the bag.

     20) Use the analytical gases to  set  the zero  and  span  of
     the analyzer.   Note  if  internal  adjustments  were  re-
     quired to span the analyzer.
iii) Calculations  (none)

iv) Acceptance Criteria

     1)  If the analyzer can be  spanned  properly  in  steps ii)
     15), and  ii)  20,  and the technique required  to span the
     analyzer  under these  conditions  is  identified in  the
     owner's manual,  then the  altitude  compensation  network
     is acceptable.

-------
                         78             TP:E.3.b.)
b)    Pressure and Temperature Compensated Analyzer Test Procedure

     i) Testing  concepts:   This test procedure is to be performed
     in  order  to  identify the  performance  of  any  pressure  or
     temperature  compensation  systems  under  the various environ-
     mental  conditions  that  may   be  encountered  during  vehicle
     inspection  testing.   In   general,   temperature  compensation
     will  be  evaluated during  the  basic  check-out  (68°F to 86°F)
     and during  the more  hostile  environmental temperature tests
     specified  in  Section  G.   No other  special  testing  would
     normally be necessary.

     In  order to  evaluate  pressure compensation  systems,  addi-
     tional  testing is  necessary.   If the  analyzer manufacturer
     can make a case that  testing the pressure  compensation  system
     in a  manner  similar to the procedure  specified  in Chapter V
     Section E.3.a)  (altitude  compensation) will represent  actual
     analysis system operating  conditions in the field, then  that
     procedure (E.3.a) may  be used  for  check-out.  If a sufficient
     case  cannot  be made,   and  a  suitable alternative test  proce-
     dure  cannot be determined,  then  performance  evaluations  of
     the pressure  compensation system  must be  carried  out in  an
     altitude  chamber.  The pressure compensation  test  shall  be
     conducted at each environmental temperature condition  speci-
     fied  In  Chapter  V.   The tests  shall be  performed  on  each
     range of each analyzer.

     ii)   Test  conditions:  The  test  conditions shall consist  of
     three  basic barometric pressures  about  which  excursions  in
     pressure shall be made.  The values  are:

          Basic Test                Excursion
          Point  (inches HgA)        Points (inches HgA)

               24.5                  24.0, 26.5
               28.5                  26.5, 29.5
               30.0                  28.5, 31

     ill)  Test Sequence

           1)  Identify  the  concentration  value  that  provides  the
          greatest  uncertainty  in  measurement as  determined  by
          Test Procedure E.I).  Obtain a calibration gas at  that
           level  (same bottle if possible).

           2)  Set  up the test equipment for one of the three  test
          points.

           3) Warm up the analyzer.

          4)  Gas span  the analyzer with a different calibration
          gas between  80 and 90 percent  of full scale on the low
          range  and bottled zero  gas.    An  electrical span would
          not  be  substituted   for  the  gas  span  in  this  step.

-------
               79             TP:E.3.b.)
5) Leak check the system.

6)  Alternately  introduce  zero gas  and  the calibration
gas identified in step 1) through the sample probe until
a total of  three  readings are obtained and recorded  for
each test step.

7)  The  test  steps  for the 24.5  in  HgA test point are:

     Test Step           Action

     24.5                gas span
     24.0                3 readings
     24.5                3 readings
     26.5                3 readings
     24.0                3 readings
     26.5                3 readings
     24.5                3 readings
     24.0                3 readings
     24.5                3 readings
     26.5                3 readings

8) Repeat steps 4) through 6)  at  the  28.5  inch HgA test
point.  The  test steps for this test  point are:

     Test Step           Action

     28.5                gas span
     26.5                3 readings
     28.5                3 readings
     29.5                3 readings
     26.5                3 readings
     29.5                3 readings
     28.5                3 readings
     26.5                3 readings
     28.5                3 readings
     29.5                3 readings

9)  Repeat steps 4) through 6)  at  the  30.0  in. HgA test
point.  The  test steps for this test  point are:

     Test Step           Action

     30.0                gas span
     28.5                3 readings
     30.0                3 readings
     31.0                3 readings
     28.5                3 readings
     31.0                3 readings
     30.0 .               3 readings
     28.5                3 readings
     30.0                3 readings
     31.0                3 readings

-------
                    ori
                                   TP:E.3.b.)
iv) Calculations

     1)  For  each  test_ point,   compute  the  standard devia-
     tion (s) and mean (x) for the 9 readings obtained at each
     pressure level.

     2)  Multiply each  standard deviation  by  a K  factor of
     2.6.

     3)  For each pressure, level at  each test point, compute
     the following:

          y  = x + Ks

          y  = x - Ks
     4)  For  each pressure level  at  each test point,  compute
     the  uncertainty  (U)  of  the measurements  based  on  the
     calibration gas used in step iii) 6) from:

          U = concentration value-^
              concentration value

     where i = 1, 2

v) Acceptance Criteria

     1) Identify the maximum uncertainty

     2)  If the  maximum uncertainty is  less  than or ajual  to
     the uncertainty  specification  (Chapter VII, Section  E),
     (plus  or  minus) ,  for  the  basic  analyzer calibration
     curve, the  pressure  compensation is acceptable.   If  the
     uncertainty is  greater  than specification,  the pressure
     compensation  is  not acceptable.   (Reference Values:  57,
     of  point above  100 ppmh and 0.4% CO, 10% of point  above
     6% CO is permissable if necessary).

     3)  If the  pressure compensation is not acceptable, then
     the  instrument  manufacturer  should undertake  an  engi-
     neering study to  identify the cause of the  problem  prior
     to  continued  testing  or introduction of the analyzer to
     the commercial market.

     4)  After the  cause of the problem  is identified  and  the
     analyzer is repaired  or  adjusted  this test  should  be
     repeated.

vi) Repeat steps iii) ,  iv) , and v) for each range of the
analyzer.

-------
                         Q1
                                        TP:E.3.c.)
c) Non-Compensated Systems

     i) If  an analyzer  manufacturer claims  that  the measurement
     uncertainty  specifications  (Chapter VII,  Section  E.)  can be
     met  without pressure  and/or  temperature  compensation,  this
     claim  can  be verified  by the  test  procedure in  Section E.
     3.b) of  this Chapter.   (Reference Values:  5% of point above
     100 ppmh and 0.4% CO, 10% of point above 6% CO is permissable
     if necessary).

-------
                              82
4.  Analyzer Zero and Span Drift Test Procedure
    (See Test Procedure Section H.I.a), Warm-up Lock-out Test Procedure)

     a) Equipment Required

          i) Candidate instrument.

          ii) One  span gas  between 70 to 90 percent  of full scale  on
          the low range.

          iii) One cylinder of zero gas.

          iv) One chart recorder (one megohm impedance or greater) with
          approximately a 10 to 12  inch wide chart.

     b) Test Sequence

          i)  Begin  the test  sequence with an  analyzer  that is  turned
          off, and has stabilized at the prevailing ambient  temperature
          for at least 3 hours.

          ii) Remove the analyzer's protective cover.

          iii)  Locate  the   meter   readout  and  attach  leads  from the
          readout  terminals  to  the   chart  recorder.   Deactivate the
          automatic zero on auto zeroing models.

          iv) Reinstall the protective cover.

          v) Turn on the analyzer.

          vi) Select a voltage range on the chart  recorder  so that full
          scale  of  chart  recorder equals  full  scale  voltage  of the
          analyzer meter on the range under test.

          vii)  The  chart  recorder must  indicate  both  negative and
          positive zero drift.  If necessary, offset the chart recorder
          zero 5 units up scale.

          viii)  As  soon  as  the warm-up  lock-out feature  deactivates,
          zero  and  span  the  analyzer with  the  analytical gases per
          manufacturer's  operating instructions,  and start the  chart
          recorder at  a  minimum chart speed of  0.5  inches  per minute.

          ix) Do not  adjust the analyzer or recorder controls (zero  or
          span) for the remainder of the test.

          x)  Reintroduce  zero  gas  (if not done  already) and start the
          test.

          xi) Mark  the chart  paper indicating  the  zero response, the
          span response, and the start of the test.

-------
                         83             TP:E.4.
     xii)  Flow zero gas  through  the  analyzer for one hour.   (30
     minutes for automatic rezeroing units.)

     xiii) Introduce  the  span gas  to  the analyzer (do not  adjust
     the equipment).

     xiv)  Reintroduce  the zero gas  to  the  analyzer  (do not  adjust
     the equipment) .

     xv) Reintroduce  the  span gas  to  the analyzer (do not  adjust
     the analyzer) .

     xvi)  Flow span gas through  the  analyzer  for  one  hour.

     xvii) Reintroduce zero gas  to  the  analyzer.

c) Calculations

     i)  Compute  the difference  (as  a  percent of- full scale  chart
     deflection) between  the  analyzer  zero response  for  the  first
     span  check  (step  b)viii)) and  the zero  response after  the  1
     hour  span check (step b)  xiv))  	 (zero drift).

     ii) Locate on  the chart  the maximum and  minimum  analyzer zero
     response  during  the  first  1  hour  period   (step  b)  xii)).

     iii)  Compute   the difference  (as  a percentage of full  scale
     chart deflection) between the analyzer  zero-response  for the
     first  span  check (step  b) viii)),  and  the maximum zero re-
     sponse  and  then  the minimum  zero-response  as  identified  in
     step  c) ii) 	 (zero drift).

     iv)  Compute  the  analyzer  span-response at  the  1  hour  span
     check as  the difference  between the chart reading of  the span
     gas  (step b)  xiii)  and the  chart reading  of  the  zero  gas
     (step b) xiv)) 	 (span  response).

     v)  Locate on  the chart  the maximum and  minimum  chart  reading
     during  the one hour  span  period  (step  b) xvi)).

     vi)  Compute  the  difference  (as  a  percentage  of  full  scale
     chart deflection) between the analyzer  zero-response  immedi-
     ately prior  to the   one  hour  span period  (step b) xiv)), and
     the  maximum  and  minimum  span chart  readings  identified  in
     step  c) v) 	 (span response).

     vii)  Compute   the difference  (as  a percentage of full  scale
     chart  deflection)  between  the span  chart deflection  at the
     end  of  the  1  hour   span,  and  the  zero-response after  the  1
     hour  span 	  (span  response).

-------
                         84             TP:E.4.
     viii) Compute  the difference  (as  a  percentage of full  scale
     chart deflection)  between  the  span  chart deflection  immedi-
     ately prior  to  the start of  the  one hour zero  test  (step  b)
     viii)) and the zero-response just  prior to that  span  check  	
     (span response).

     ix)  Compute  the  difference (as a  percent of  full  scale  chart
     deflection) between the zero-response just prior to the  start
     of the 1 hour span  (step b) xiv)), and  the zero-response just
     after  the 1  hour  span   (step  b) xvii))  	  (zero   drift).

     x) Compute difference  (as  a percentage  of  full  scale  chart
     deflection) between  the  following span responses  in  step c):
          (vi max) to  (iv)    span drift
          (vi min) to  (iv)    span drift
          (vii)  to (iv)      span drift
          (viii) to (iv)      span drift
d)  Acceptance Criteria

     i)  If  each value  computed in  steps  i),  iii) max,  iii)  min,
     and  ix)  is less  than or  equal to the specifications  listed
     for zero drift, the zero drift  of  the  analyzer  is  acceptable.
     (Reference value: ±2% fs L.S.)

     ii)  If  each  value computed in  step x) is  less  than or equal
     to  the  specifications for span drift,  the span drift  of  the
     analyzer  is  acceptable.    (Reference  value: ±2%  fs  L.S.).

-------
                              85             TP:E.5.-6.







5.  Analyzer Span Drift Test Procedure




(See Analyzer Zero and Span Drift Test Procedure,  E.4.)




6. Analyzer Noise Test Procedure




(See Analyzer Gaseous Interference and Noise Test  Procedure,  E.8.)

-------
                              86             TP:E.7.
7. Analyzer Sample Cell Temperature Test Procedure
   (See Test Procedure Section H.I.a), Warm-up Lock-out Test Procedure).

     a) Equipment Required

          i) Candidate instrument.

          ii) Thermocouple readout device.

          iii) Type J or type T thermocouple.

     b) Test Considerations

          i)  The sample  cell test  procedure may be  run concurrently
          with the  zero/span  drift test or  any  other  test that begins
          with an analyzer that is not warmed up.

          ii)  It is recommended that the  test  equipment remain hooked
          up  to  the analyzer  for the  duration  of  the  analyzer  check
          out, and  the  temperature of the sample  cell should be  moni-
          tored  from time to time.

     c) Test Sequence

          i) Locate on the  sample cell a point,  based on engineering
          judgement, that would be the coldest point.

          ii) Attach a  thermocouple to the  sample cell at the  location
          identified in step i).

          iii)  Conductive,  convective,  and  radiation losses  must be
          considered  in  the   selection of  the  location,  and  in  the
          manner of thermocouple attachment.

          iv)  Stabilize the  analyzer at the  prevailing ambient  temper-
          ature  for at least 3 hours.

          v) Record the sample cell temperature.

          vi) Turn  on the analyzer.

          vii) As  soon  as the warm-up  lock  out  feature is deactivated,
          record the temperature of the sample cell.

          viii)  Immediately switch to sample  ambient air  (or  analytical
          gas  at  the  ambient  temperature)   through  the  sample  line.

          ix)  Monitor  the  sample cell  temperature  over the  next  5
          minutes.

          x)  Record the  lowest sample  cell temperature  during  the  5
          minute period.

-------
                          87              TP:E.7.
d) Calculations
     (None)
e) Acceptance Criteria

     i) If the temperature  recorded  in  step  c)  v)  is approximately
     the same as the ambient  temperature,  the analyzer is properly
     stabilized.

     ii) If  the  temperatures recorded  in  step c)  vii) and step c)
     x.) are equal to or greater  than the specifications for sample
     cell  temperature,  the sample cell  temperature is acceptable.
     (Reference value: 49°C (120.2°F).)

     iii)  While  monitoring the  sample  cell  temperature during the
     analyzer check-out procedure, if the  temperature is less than
     the  specifications  when  concentration data  (span  or sample)
     is  read,  the  acceptance  in step  ii)  is void.   (Reference
     value: 49°C (120.2°F).)

-------
                              88             TP:E.8.



8.  Analyzer Gaseous Interference and Noise Test Procedure

     a) Equipment Required

          i) Candidate instrument.

          ii) One  high  impedence  (1 megohm  or greater) digital volt-
          meter with at  least 4% digit resolution.  Generally, a 2 volt
          (1.9999 v) and a 20 volt  (19.999  v)  scale will be adequate.
          A  chart  recorder  of  similar  impedence,  resolution,  and
          scaling may be used in place of a voltmeter.

          iii) One  calibration  gas with approximately  14% CO- and the
          balance N_.

          iv) One steam  generator.

          v) One mixing  chamber with probe attachment,  dilution valve,
          and chamber air temperature readout system.

          vi) One calibration gas with approximately 100 ppm NO^.  The
          NO^ value must have been checked within 48 hours of the start
          of  the  testing  sequence  with  a  chemiluminescent  analyzer
          meeting the  specifications of 40 CFR 86  Subpart B,  D, or N.

          vii) One  span  gas between 70 and 90  percent of  full scale on
          the low range, and bottled zero gas.

          viii) Tedlar sample bags.

          ix) Associated lines and fittings  (non-reactive).

     b) Test Sequence

          i) Remove the  analyzer's protective cover.

          ii)  Locate  the  meter  readout  and  attach  the  voltmeter or
          chart recorder leads to the meter terminals.

          iii) Reinstall the analyzer's protective  cover.

          iv) Temporarily bypass the water trap.

          v) Warm up the analyzer.

          vi) Introduce  the span gas to  the  analyzer through the  span
          port.

          vii) Adjust  the span so that the  analyzer reads 100 percent
          of low scale.

-------
                    89
                                   TP:E.8.
viii) Observe the voltmeter  reading at  100 percent  full  scale
of the analyzer and record the voltage  value.  Alternatively,
adjust the chart recorder so  that  full  scale  is  equivalent  to
the analyzer full scale.

ix) Zero  and  span the analyzer  with .the analytical gases  to
the proper values.

x) Fill a sample bag with span gas.

xi)  Introduce  the span  gas from  the sample  bag to the  ana-
lyzer through the probe.

xii) After  the  reading has  stabilized,  observe  the voltmeter
or  chart  recorder.   Record  the  highest value and  the  lowest
value over  a 3  minute time  span.  The scale can  be  changed
for better resolution.

xiii) Fill another sample bag with C0_.

xiv) Introduce the C0_ through the sample probe.

xv)  Record  the average voltmeter  or  chart recorder reading.
The scale can be changed for better resolution.

xvi)  Fill a  sample  bag   (after purging with  N )  with  NO,..

xvii) Introduce the N0_ through  the sample probe.

xviii) Record  the average  voltmeter  or chart recorder  read-
ing.  The scale can be changed for better resolution.

xix) Start the steam generator.

xx)  Attach  the probe  to the  mixing  chamber  and  adjust  the
dilution  valve  to obtain  a  40°C  (101°F)  temperature  in the
dilution box.  To prevent condensation  in the  analysis system
this  test should  be  performed  with  an ambient  temperature
between  30°C  and 40°C.   This test  cannot  be performed  cor-
rectly when  testing at  the lower ambient temperature condi-
tions  specified  in  Section  G  of this  chapter,  and  should
therefore, be omitted when  testing under Section G.

xxi) Sample from the dilution box.

xxii) Record the average voltmeter or chart  recorder reading.
The scale can be changed for better resolution.

xxiii) Reconnect the water  trap.

-------
                         90             TP:E.8.
     xxiv) Repeat  steps xix) through xxii)  with an ambient  temp-
     erature  at  the  same  value as  in  step  xx) and  40°C  in  the
     dilution  box.   When  repeating  this  test  at  the operating
     environmental  conditions  specified  in  Section  G of   this
     chapter, perform  this  test with a 40°C dilution  box tempera-
     ture and the  analysis  system at the prevailing ambient  temp-
     erature.

c) Calculations

     i)  Compute  the difference  between  the  high and  low  reading
     recorded in step b) xii), then divide that  result  by the  full
     scale voltage value recorded  in step  b)  vii).   This value,
     expressed as  a percentage  and  divided  by 2,  is defined as
     noise of the analyzer.

     ii)  Divide  the  value  recorded  in  step  b) xv)  by  the  full
     scale voltage value recorded  in step  b)  vii).   The  result,
     expressed  as   a  percentage,  is  the  CO,  interference  of  the
     analyzer.

     iii) Divide the  value  recorded  in step  b)xviii)  by the  full
     scale voltage value  recorded  in  step  b)vii).   The  result,
     expressed  as   a  percentage,  is  the  NO,  interference  of  the
     analyzer.

     iv)  Divide  the value  recorded   in  step b)xxii)  by  the  full
     scale voltage value  recorded  in  step  b)vii).   The  result,
     expressed as  a percentage, is  the  water interference of  the
     analyzer.

     v)  Divide  the value  recorded   in  step ^b)xxiv.)  by  the  full
     scale voltage value  recorded  in  step  b)vii).   The  result,
     expressed as  a percentage, is  the  water interference of  the
     system.

d) Acceptance Criteria

     i)  If   the  percentages  calculated   in  paragraph  c)  for  the
     analyzer  are   equal  to or  less than  the  specifications  for
     noise and gaseous  interferences  (Chapter V,  Section E.),  then
     the noise and  gaseous interferences  are  acceptable.

     Reference values: noise = ±0.5%
                        CO    = 1.5%  fs L.S.  HC;  1.0%  fs L.S.  CO
                        NO,   = 1.5%  fs L.S.  HC;  1.0%  fs L.S.  CO
                        HO   = 1.5%  fs L.S.  HC;  1.0%  fs L.S.  CO

     ii)  Inspect  the  analysis  system between  the water trap  and
     the  optical bench for  condensed water.  If water vapor  drop-
     lets are found  repeat  the water  checking  test for a  longer
     period  of  time.    If  substantial water  is found, the effec-
     tiveness of the water trap is not acceptable.

-------
                                  91
                                                 TP:E.9.
9.  Analyzer Electrical Interference Test Procedure

     a) Equipment Required

          i) Candidate instrument.

          ii)  One  high  impedence  (Imegohm  or greater)  digital  volt
          meter with at least 4^ digit resolution.  Generally,  a  2  volt
          (1.9999 v)  and  a 20 volt  (19.999  v)  scale will  be  adequate.
          A  chart  recorder  of  similar  impedence,   resolution,   and
          scaling may be used in place of a  voltmeter.

          iii) One  vehicle with high energy ignition system,  and solid
          core ignition and coil wires.

          iv) One  3 amp  or more variable  speed (commutator type)  hand
          drill with a plastic handle.

          v) One 20 foot extension cord with 3  sixteen  gauge wires,  and
          a  2 plug  outlet.  For systems without ground  fault  circuits,
          a  2  wire extention  cord or  a non-grounded  adaptor will  be
          req uired.

          vi) A  CB  transmitter at or near FCC  legal maximum power  with
          a matching antenna.

          vii) One variable voltage transformer (90v  to 130vAC).

          viii) One span gas between 70 and  90  percent  of  full scale on
          the low range.

          ix) One dry flannel cloth.

     b) Test Sequence

          i) Remove the analyzer's protective cover.

          ii)  Locate  the  meter readout,  and  attach  the   voltmeter  or
          chart recorder leads  to  the meter  terminals.

          iii) Reinstall the analyzer's protective  cover.

          iv)  Check  the   outlet box  to be  used for  proper hot  lead/
          neutral lead orientation and for proper ground.

          v)  Plug  the analyzer's  power cord into a 2-outlet  grounded
          electrical outlet box and warm up  the analyzer.

-------
                    92             TP:E.9.
vi) Reserved

vii) Reserved

viii)  Introduce  the  span gas  through  the span  port,  and
adjust the span so that the analyzer  reads  100  percent  of  low
scale.  It is not necessary to substitute the electrical span
in  pressure  and temperature  compensated  models for  this  gas
span.

ix)  Observe  the voltmeter or chart  recorder  reading  at  100
percent  full  scale  of  the analyzer,  and record the voltage
value.

x)  Zero  and span  the analyzer  with  the analytical  gases  to
the  proper  values.   Record the  values.   It is not necessary
to  substitute  the electrical  span in compensated models  for
this gas span.

xi)  Introduce  span gas to the  analyzer.   Record the average
span gas voltage levels over  a 5 minute time span.  The scale
can be changed for better  resolution.

xii) Either move the analyzer or the  vehicle (engine  compart-
ment) to within 2 feet of  each other.

xiii) Introduce the  span gas  to  the analyzer.

xiv) Open the hood and start  the vehicle.

xv)  Record  the  average  span gas voltage   level  during a  5
minute time span.

xvi) Stop the vehicle engine.

xvii)  Plug  the electric  drill  into  the  other outlet  of  the
same receptacle that the analyzer  is  connected  to.

xviii) Move  the drill  at approximately  3  to 4 feet high  to
within  12 inches  of the  analyzer.  At four  locations  around
the  analyzer vary  the drill speed  from minimum to maximum
speed.   Attempt  to  locate  the  positions   that \ provide  the
greatest  interference.

xix) Record  the average span gas  voltage level at  each posi-
tion.

xx) Key the CB radio within 50 feet of the  analyzer.

xxi)  Record  the average   span gas voltage   level when  the  CB
radio  is  transmitting.

xxi) Turn the analyzer off.

-------
                                        TP:E.9.
     xxiii)  Plug  the  extension  cord  into  the  variable voltage
     transformer  and  set  the  transformer  output  to  110 volts.

     xxiv) Turn the analyzer on, and warm  it up.

     xxv)  Check  the  zero and  span.   If  necessary  reset to  the
     exact voltage level recorded in step  b) x).  It  is not neces-
     sary to substitute  the  electrical span in compensated models
     for this gas span.

     xxvi) Repeat step b) xii) through  xxi).

     xxvii) Record the average span gas voltage level as-indicated
     in steps b) xv), xix), and xxi).

     xxviii) Reduce  the transformer  output  voltage  to  90 volts.
     Let analyzer stabilize for 2 minutes.

     xxix)  Repeat  steps  b)  viii) through  xxi),with the  extention
     cord  and  90 volt  set-up.   Non-relevant  set-up  steps may  be
     omitted.

     xxx)  Increase  the transformer output to  130 volts.  Let  the
     analyzer stabilize for 2 minutes.

     xxxi)  Repeat  steps  b)  viii) through  xxi)  with the  extension
     cord  and  130 volt set-up.  Non-relevant  set-up  steps may  be
     omitted.

     xxxii)  If  the unit  has an analog meter,  observe and record
     the meter reading with span gas.

     xxxiii) Rub  the  meter  face   10  times  with  the dry flannel
     cloth  in  the up-scale direction.   Record  the meter  reading.
     (Only  required  at lowest and  dryest  temperature used during
     evaluation testing).

c) Calculations

     i) Compute  the  difference between each set  of voltage levels
     recorded  in  step b)  x)  and b)  xv).   The maximum  difference
     expressed as  a  percentage of  the  voltage  recorded  in step  b)
     ix) is defined as the RF interference (RFI).

     ii) Compute the difference between each set  of voltage levels
     recorded  in  step b)  x)  and b)  xx).   The maximum  difference
     expressed  as a  percentage of  the voltage  recorded in  step
     b)ix)  is defined as the induction  interference.

     iii)  Compute  the  difference  between  each set  of voltage
     levels recorded in step b)x) and b)xxi).   The maximum differ-
     ence  expressed as  a percentage  of  the  voltage recorded  in
     step b)ix) is defined as the VHF interference.

-------
                         94             TP:E.9.
     iv)  Compute the  difference  between the  voltage  levels  re-
     corded in  step  b)  x) and step b) xxvii).  The  largest  result
     expressed  as a  percentage of the voltage  recorded  In step b)
     ix) is defined as the line interference.

     v) Compute  the difference between the voltage  levels recorded
     in step  b) x)  and b) xxix).  Compute  the difference between
     the voltage levels  recorded in step b)  x) and  b) xxxi).   The
     largest value of the results expressed as  a percentage  of  the
     voltage  recorded  in  step b) ix)  is  defined  as the line vol-
     tage interference.

     vi) Compute the difference between the meter reading recorded
     in step  b) xxxii)  and b) xxxiii).   Also compute the differ-
     ence  as  a  percentage  of full  scale.   The difference  is  de-
     fined as the static electricity interference.

d) Acceptance Criterion

     i) If the  percentages calculated  in  paragraph  c) are e^ual  to
     or  less   than  the  electronic   interference   specifications
     (Chapter VII,  Section  E.),  then  the electrical interferences
     are acceptable.

     Reference  values:   RFI            = 1.0%  fs L.S.
                         VHP            = 1.0%  fs L.S.
                         Induction  .    = 1.0%  fs L.S.
                         Line           = 1.0%  fs L.S.
                         Line Voltage   = 1.0%  fs L.S.
                         Static         = 1 meter division or  2^ fs L.S,
                                          whichever is greatest.

-------
                              95             TPrE.10.



10.   Propane to Hexane Conversion Factor Test Procedure

     a) Testing Concepts

          i) The conversion factor shall be evaluated  at  two  hexane
          concentration levels.

               1) 250 ppmh ( _+ 15 ppmh) on the  low  scale,  and

               2) 1500 ppmh ( +_ 150 ppmh) on the high  scale.

          ii)  A  minimum  of  three  samples of  the hexane  gas at' each
          concentration level shall be performed.

          iii) Because of  the  exceptional hang-up characteristics  of
          hexane,   an  auxilliary   sample/spanning   system   that   is
          specially  constructed  to be essentially  hang-up free may  be
          used.  The auxilliary system should be of laboratory quality,
          and  may  bypass  the  candidate  analysis   system   controls.

          iv) The test should always be conducted at an ambient temper-
          ature greater than  20°C (68°F).

          v) A flame ionization detector  (FID) properly optimized and
          calibrated  (see 40  CFR  86  Subpart  D or N) may be used  to
          provide additional  quality  control  on the  conversion factor
          determination procedure.

     b) Test Sequence

          i) Set up  the test  equipment.

          ii) Warm-up the candidate analyzer.

          iii) Leak  check the system used.

          iv)  Span  the analyzer on the  low  range with a  propane  cali-
          bration  gas  near  (  +_  5%)  the  expected  low  concentration
          hexane response,  and  with bottled zero gas.  Use the propane
          to  hexane  conversion  factor  indicated on   the   analyzer.

          v)  Alternately cycle  low  concentration hexane  gas and  the
          calibration  gas through  the analyzer a  total  of  3 or more
          times.

          vi)  Record each response  for each gas.

          vii)  Span  the  analyzer  on  the  high  range with  a propane
          calibration  gas near ( _+ 5%) the expected high  concentration
          response,  and  bottled zero  gas.   Use  the  propane  to hexane
          conversion  factor indicated  on the analyzer.

-------
                                        TP:E.10
     viii) Alternately cycle the high concentration  hexane gas and
     the calibration  gas  through the analyzer a  total  of  three or
     more times.

     ix) Record each  response for each  gas.

c) Calculations

     i) For  the values recorded in  step b)  vi), and b) ^ix),  com-
     pute the  mean  (x)  and standard  deviation(s)   for the hexane
     response and the propane response.

     ii) Use an   of 0.05 and  the student's  "t"  test to  determine
     the  confidence  interval  of the  population mean  at the  90%
     confidence  level based on the  values  computed  in  step c)  i)
     for each range.

     iii) Use the following equation to determine the mean propane
     to hexane conversion factor (CF)  for each  range:

                (.5) + (.5)(x,    - Hex  Cal)
       CF =    	^	
                            Hex Cal

     where:

     x hex = the mean hexane response  determined  in  step  c)  i).

     Hex Cal = concentration of hexane  calibration gas.

     iv) Determine  if sufficient number of  cycles (steps  b)  v) and
     b) viii)) were run on  each range by the  following  equation:

                  (.5)(x.    - x  ) +  (.5) Hex  Cal
       o.oi  -         hex    CI  "	
                            Hex Cal

     where:

     x hex = the mean hexane response  determined  in  step  c)  i).

     x   = the  confidence interval determined in  step c)  ii).
      L» J.
     Hex Cal =  concentration of hexane calibration  gas.

     v)  For each range, multiply   the  mean  propane response  (x)
     determined  in  step c) i)  by the  CF computed in step c)  iii).

     vi) Determine  the difference between  the CFs  for  each range,
     and determine  the mean CF.

-------
                         g?              TPrE.10
d) Acceptance Criteria

     i) If the value computed  in  step  c)  iv)  is  greater than 0.01,
     perform  additional  cycles   (see  steps  b)  v)  and b)  viii))
     until the computed value  is  less  than  0.01.

     ii) If the difference between  the CFs  computed  for each range
     (step c)  vi))  is greater than .030  a  sperate CF must be used
     for each  range.   If the  difference  is less  than .030,  a mean
     CF may be used for both ranges.

     iii)  The  CF value(s)  determined  by step d) iii).must agree
     exactly with the CF posted  on the  analyzer.   ASTM round-off
     shall be used.

     iv)  The mean  propane  value  determined in  step c) v)  must
     agree with  the  propane  calibration gas within  1  percent  of
     the propane  calibration gas  concentration.

     v) The  final CF value must  be between  the  limits identified
     in Chapter VII, Section E, paragraph 9.
           (Reference value: 0.48  £ CF  £ .56)

-------
                                   98             TPrF.l.
F.  Sample System Test Procedures

     1.  Sample Cell Pressure Variation, Low Flow, and Response Time

          a) Test Equipment

               ±) Candidate instrument system.
                                   h
               ±±) One span gas cylinder with a concentration between  70  and
               90 percent of full  scale, and bottled  zero  gas.

               iii) One gauge (0-30 inches of water).

               iv) One pinch clamp.

               v) One Tedlar sample bag  (approximately 3 cubic foot capacity)

               vi) One 3-way ball  valve, minimum orifice size is  .180  inches.

               vii) One stop, watch or timer.

               ix) Associated fittings and lines (non-reactive material).

          b) Testing Sequence

          This test procedure is written around parallel HC  and CO analyzers,
          and should be performed  on each analyzer.   If the  analyzers  are in
          a  series  configuration  then an  additional  pressure gauge will  be
          required, but  the  test  can be performed  on both  analyzers  at  the
          same time.   A  special test set-up  that  attaches  to the probe  and
          provides  gas at approximately the  same,pressure as occurs  during
          sampling  may be substituted  for the Tedlar  bag,  ball valve,  and
          timer.   Using  a solenoid  valve interfaced with a timer or  chart
          recorder will provide more accurate results.

               _i) Identify the sample line entering the sample cell.

               ii)  Install a  tee fitting in  the  sample  line  immediately
               upstream  of  the  sample  cell  (in  as close  as   practical).
               Install the tee with the branch pointing up.

               iii) Connect the gauge to the  tee with the  suitable length of
               flexible tubing.

               iv) Warm up the analyzer.

               v) Zero the analyzer.

               vi)  Introduce  span gas through the  spanning  network.   Record
               the pressure gauge  reading, and the  span response.

               vii) Recheck  the zero.  If the zero has shifted  repeat steps
               v), vi), and vii).

-------
                     99              TP:F.l.
viii) Switch  the analyzer from  span  gas flow  to  sample  flow
(pump on) .

ix) Record  the maximum and  minimum fluctuations in the gauge
reading.

x) Attach the  pinch clamp  to the pressure gauge line.   Slowly
pinch the  line  until  the gauge fluctuations  are minimized.

xi) The gauge  reading  should be  approximately halfway  between
the  readings  recorded in  step  ix) .   Record  the  stabilized
gauge reading  In  step  x) .

xii) Attach  the common port of  the 3-way valve  to the probe
with a leak free  adapter.

xiii) Attach  a short  length of  tube to  one  of the remaining
two ports of the  three-way valve,  and  sample  room air  through
the tube .

xiv) Fill the  sample bag with span gas.

xv) Attach  the sample bag to the remaining  port of the 3-way
valve.

xvi) The 3-way valve should  be sampling  room air.

xvii) switch  the 3-way valve  to the sample  bag,  compare  the
stabilized concentration reading of the  bag  to the reading in
step vi) .   A difference of  more than  1  percent from the  con-
centration  reading  in  step  vi)  could  indicate a  leak  in  the
system.   Repair  any leaks,  and  restart  the  procedure  at  step
xviii)  Recheck  the zero by  switching the 3 way valve back to
room air.

xix) Identify the  concentration value corresponding to 95% of
the span gas In  the bag.   Record the 95% value.

xx) Switch  the  3-way valve  to the sample  bag  and  simultane-
ously start a timer.

xxi) When  the  analyzer response  reaches  the  95%  value stop
the timer.  Record the  elapsed time.

xxii)  Record  the sample  cell  pressure  after the  analyzer
reading  has  stabilized.    Record  the  stabilized  analyzer
concentration reading.

xxiii)  Identify  the concentration value (5%) corresponding to
the  stabilized   reading in  step xxii)  (100%)  minus  the  95%
value identified  in step xix).

-------
                          ioo            TP:F'2'
     xxiv)  switch  the  3-way  value back  to room  air and  simul-
     taneously start the timer.

     xxv) When  the  analyzer reaches the 5%  value,  stop  the  timer.
     Record the elapsed time.

     xxvi)  Connect   the  needle  valve  between  the  probe and  the
     3-way valve.

     xxvii) Adjust  the needle valve until the low  flow  indicator
     is just barely activated.

     xxviii) Repeat steps xvi) through xxv).

     xxix) Use  the  same 95% and  5% values identified  in  step xix)
     and xxiii).

     xxx) Record  the 5% and  95% response times.

     xxxi) Record the stabilized  concentration  reading,  and  sample
     cell pressure  in the same manner used in  step  xxii).

c) Calculations

     i)  Compute the difference  in pressure between  step vi)  and
     step  xi),  and  step  vi) and  step xxii).   The values will  be
     the   pressure   difference  between   spanning   and   sampling.

     ii) Compute  the  difference between maximum  and minimum pres-
     sure readings  In step b)  ix).  The value will  be  the pressure
     variation during sampling.

     iii)  Compute the  difference  in'pressure between  step xi)  and
     step  b)   xxxi).    The   value   is  the  difference  in  pressure
     variation  between  normal   flow  and  low  flow   conditions.

     iv)  Compute  the percentage  change in  analyzer  gas  response
     between step b) xxii) and step b) xxxi).

d) Acceptance Criteria

     i)  If  the calculated value  in steps  c)i,  and  c)iii are less
     than  4 inches  of water,  and  less  then 6  inches  of water fo.r
     step  c)ii,  the  pressure  variations  in  the analyzer  flow
     system under these test conditions are  acceptable.

     ii) If the change in analyzer response computed  in step c)iv
     is  less  than  1.5  percent and the  elapsed  times  recorded  in
     step b) xxx) are less than  14 seconds,  the low flow indicator
     system  is acceptable  as well as the. system  response  time.

     iii) If the  elapsed 'time  in  steps b)  xxi)  and  b)  xxv) is less
     then  14 seconds, the 'system  response  time  is acceptable under
     normal conditions.

-------
                    101
iv) It  is  recommended that  the  sample  cell  pressure  gauge(s)
remain hooked  up  for the duration  of the  analyzer  check  out.
If the  sample  pressure varies by more  then  4  inches  of water
from  the  most  recent  span  pressure,  then  the acceptance in
d)i is void.

-------
                              102            TP:F.2.-4.



2.  Maximum Sample Cell Pressure Variation during Sampling Test Procedure

    (See Test Procedure F.I)

3.  Maximum Sample Cell Pressure Variation Between Normal Flow
    and Low Flow Indication Test Procedure

    (See Test Procedure F.I)

4.  Response Time Test Procedure

    (See Test Procedure F.I)

-------
                                              TP-
                               103             !*•.
5.  System Leakage Test Procedures

     a) Equipment Required

          i) Candidate instrument.

          ii) One tee fitting.

          iii) One needle valve.

          iv) One span gas  70  to  90  percent of full scale on the low
          range, and bottled zero gas.

          v) Associate lines and  fittings (non-reactive).

     b) Test Sequence

     This sequence  is  written to evaluate the ease of operation of the
     leak checking  equipment.   It may  also be used to correlate abbre-
     viated leak checks with the  gas comparison test.

          i) Install  the  tee fitting  between the probe  and  the sample
          line.

          ii) Attach  the  needle  valve  to the remaining port of the tee
          and close the valve.

          iii) Warm up the  analyzer.

          iv) Zero and span the analyzer with the analytical gases.  It
          is not necessary  to  substitute the electrical span in compen-
          sated models for  this gas  span.

          v) Record the span value.

          vi) Place the probe  in  the leak check receptacle.

          vii)  Record  the  analyzer response  to  span  gas  introduced
          through  the  leak  check recepticle,  probe,   and  sample line.

          viii) If  the analyzer  response in step vii) differs from the
          response  in step v)  by  more  than  1  percent of  the value
          recorded  in step v),  check  the  system  for  leaks  or other
          problems.  Restart the  procedure at step iii).

          ix) Compute  the  concentration  value that would result from a
          leak of 3 percent.

          x) Gradually open the needle valve until the computed concen-
          tration valve is  obtained.

          xi) Use the bubble  check  method  to  check   for  leaks In the
          spanning system.

-------
                              104            TP:F.5.-6.
          xii) If  the  unit is equipped with  an abbreviated leak  check
          or  leak  warning light, perform  the manufacturers leak  check
          with the calibrated leak from step  x).

          xiii) Repeat steps  ix) through xi) with leaks of  1%,  2%, and
          4%,  if  the  unit is equipped with  an abbreviated  leak  check.

     c) Calculations

          i)  Plot  the leak rate against  the manufacturers  abbreviated
          leak  check  criteria   (linear   regression  is  acceptable).

     d) Acceptance Criteria

          i)  If  the  spanning system  shows   significant  leaks at  fit-
          tings,  attempt to repair the leaks  by tightening or  replacing
          the  fittings.    If   leaks  .occur  in  other locations  of  the
          spanning system, or appear to be the  result of system  design,
          an  engineering  report must be  submitted  by  the analyzer
          manufacturer describing the  causes  and  preventive remedies
          for  the leak prior final acceptance of  the system.

          ii)  The relation  of  leak  rate  to  the abbreviated checking
          criteria must  be single valued,  and of sufficient  magnitude
          that interpolation  of  the  exact leak  rate  can  be  made  with
          little difficulty.

6.  HC Hang-up Test Procedure
    (See Test  Procedure C.4.)

-------
                                    105             TP!G-1'
G.  Operating Environmental Test Procedure

     1.  Test Procedure

          a) Equipment required

               i) Candidate instrument

               ii) Environmental chamber with  temperature  capability  between
               35°F  and  110°F,  and humidity  capability  between  10  and  99
               percent relative humidity.

          b) Test Conditions

               i)  105°F  (+ 5%°F)  with  a relative  humidity between  80 and  85
               percent (non-condensing).

               ii) 40°F  (+ 5°F) with a relative humidity between  75 and  80
               percent with a  10 mph wind.

               iii)  35°F (+ 5°F)  with  a relative  humidity between  10 and  20
               percent.

          c)  Required Tests of each  test  condition  (Test Procedure  numbers
          are given  in parentheses).

               i) System Warm-up (H.I.a))

               ii) System  Leakage  (F.5.)

               iii)  Sample Line Crush Test  (C.2.)

               iv) Analyzer Calibration Curve  (E.I.)

               v) Pressure and Temperature  Compensation (E.3.  b)  and  c))

               vi) Analyzer Zero and Span Drift  (E.4.)

               vii)  Sample Cell Temperature (as  applicable,  see E.7.  and H.I.)

               viii)  Analyzer  Water Interference (E.8.)

               ix) Sample  Cell Pressure Variation, Low Flow,  and  Response
               Time  (F.I.)

               x) HC  hang-up  (C.4)

               xi) If used, all automatic  systems  (Chapter VIII)

               xii)  If used, anti-dilution  system

-------
                         106            TPrG.l.



     xlli) If used, loaded mode kit

     xiv) If used, automatic data collection system

d) Test Sequence

     i) The  analyzer  shall be turned off and allowed  to  stabilize
     at least 3 hours at the test condition prior  to beginning  the
     performance check.

     ii) The warm-up test  followed by the leak check test shall be
     the first two tests performed at each test condition.

     iii) The  remaining tests may be  performed  in any convenient
     order.

     iv) An  additional  leak check shall  be  performed  at  the  com-
     pletion  of  the  required  tests  for  each   test condition.

     v)  The  first  test  condition  shall be  the  35°F  condition
     followed by the 40°F  and the 105°F conditions.

e) Acceptance Criteria

     i) If  the  analysis system passes  all  of  the individual  test
     requirements as specified by each test in c)  and  d),  then  the
     environmental  operating  characteristics of  the  system  are
     acceptable.

-------
                                    107
H.  Fail-Safe System(s)

     1.  Warm-up Lock-out Test Procedure

          a) Equipment Required

               ±) Candidate analyzer.

               ii)  The  equipment  required  to perform  the Analyzer  Sample
               Cell  Temperature  Test  Procedure (see  Section  E.7.),  if  the
               unit uses a heated  sample  cell  (not  required on  other units).

               iii) The  equipment  required  to  Perform  the  Analyzer Zero Test
               Procedure (see Section  E.4.).

               iv) A timer.

          b) Test Sequence

               i)  Follow  the  basic  measurement preparations  indicated  in
               Test Procedures E.4. and E.7.

               ii)  After the analyzer has  stabilized  at  the ambient  condi-
               tions  as  determined  by   Test  Procedure  E.7.   Turn  on  the
               analyzer  power  and  simultaneously  start a timer.   (A chart
               recorder may be used).

               iii)  The  chart  recorder  must  indicate  both  negative  and
               positive  zero drift.   If necessary,  offset  the chart recorder
               zero 5 units up scale.

               iv)  As  soon  as  the  warm-up   lock-out  feature deactivates,
               record  the  elapsed  time from power  on,  the sample cell temp-
               erature,  and  immediately  zero and  span  the  analyzer  with
               analytical  gases  per  manufacturer's operating  instructions.
               Simultaneously, start  the  chart recorder  (in already started,
               mark  the chart)  at a minimum  chart speed  of 0.5  inches  per
               minute.

               v) Immediately after spanning,  begin sampling ambient air (or
               analytical  zero   gas at the ambient temperature)  through  the
               sample  line.

               vi)  Monitor the  zero  drift and the sample  cell  temperature
               for  5 minutes.

               vii)  Record the  lowest sample  cell  temperature during the  5
               minute period.

-------
                          108
c) Calculations

     i)  Locate  on  the chart  the  maximum and  minimum  analyzer
     zero-response during the.5.minute period.

     ii)  Compute  the  difference  (as  a percentage  of full  scale
     chart  deflection)  between  the  analyzer zero-response  deter-
     mined  by  the  span check in  step b) iv) and  the maximum zero-
     response, and then the minimum  zero-response as identified in
     step c) i).

     iii)  Determine the  largest  difference  in   step  c) ii)  and
     multiply it by 2 	 (zero drift).

d) Acceptance Criteria

     i)  If  the  temperature  observed in  step  ii)  2) is  approxi-
     mately  the  same as the  ambient temperature, the analyzer is
     properly stabilized.

     ii)  If the  temperatures recorded  in  step  ii) 4) and step ii)
     7) are equal to or greater than the specifications  for  sample
     cell  temperature,  the  sample cell  temperature  is acceptable.
     (Reference value:'  498C  (120.2°F)).

     iii) While  monitoring  the sample cell temperature  during the
     analyzer check-out procedure, if the  temperature is  less than
     the  specifications when concentration data  (span or sample)
     is read, the acceptance  in1step ii) is void.
                     -   :      ,    r        '   • "f
     iv)  If the  zero drift,  as calculated  in  step c) iii) is less
     than the  specifications for zero drift (Chapter VII, Section
     E.), then  the zero drift after warm  up is acceptable.   (Ref-
     erence value: ±2%  fs L.S.).

     v) Acceptance of the above criteria constitutes acceptance of
     the Warm-up Lock-but system.

     vi) If the analyzer manufacturer indicates a typical lock-out
     elapsed time to the ultimate user,  then the  manufacturer must
     show  that  the" elapsed  time supplied to the  user  is  truly
     typical if  the time recorded in step b)   iv) is more than 30
     percent longer than the  time indicated to  the user.   The time
     recorded  in  step  b)  iv) must  be  reported  in  the  evaluation
     report for each environmental condition.

-------
                              109            TP:H.2.
2. Analyzer Low Flow Test Procedure

     i) See Test Procedure F.I., Sample Cell Pressure Variation,  Low
     Flow, and Response Time.

     ii) Visual Observation of Features

-------
                                   no            TP!I-1-
I.   System Correlation Test Procedures

The correlation procedure is designed to evaluate the performance of  the  I/M
analyzers when  sampling  auto exhaust.  The NDIR  procedure is slightly dif-
ferent from  the FID HC correlation procedure.  However,  it is expected  the
data  collection  phase  of  each  procedure can  occur  simultaneously.    For
clarity they will be presented as separate procedures.  Note:  the FID proce-
dure is not required for accreditation.

     1.  NDIR Analyzer Correlation Test Procedure

          a) Equipment Required

                i) Candidate instrument.

                ii) A raw exhaust CO analysis system meeting  the requirements
                of 40CFR 86, Subpart D, for gasoline-fueled engines.

                iii) A  laboratory  grade NDIR HC analyzer  substantially  simi-
                lar  in  quality to  the laboratory  CO analyzer, and operated
                according  to  the requirements  for general  NDIR analysis  of
                gasoline-fueled engines  contained  in  40  CFR  86,  Subpart  D.

                iv)  A  tailpipe extension  that meets  the probe location  re-
               quirements in 40CFR 86 Section 312-79  (c)  (v).

                v) Two test vehicles.

                vi)  Calibration gases  for each range  used on both the candi-
                date  analyzers and  the  reference analyzer.   In  this  test
                procedure,  calibration gases  will  be used  instead   of span
                gases to  span both analysis  systems.   The calibration  gases
                should  be between 70  and  90  percent of  full  scale  on each
                range  used.   Calibration  gases  for  the  Subpart  D analysis
                system  shall  meet  or  exceed  the  requirements specified  in
                Subpart D.

                vii) Option:   An adjustable dilution  box and  mixing  chamber
                may  be  used  to obtain different exhaust concentration levels
                from the  vehicle.   The dilution box and mixing chamber  would
                be  installed  between  the  tailpipe and  the  analysis system
                probes.

                viii)  Option:  A  chassis  dynamometer would   be  useful  for
                loading the vehicle  to obtain different emission levels,  but
                is not required.

          b) Test vehicles

                i)  One  1975 or later  non-catalyst light-duty  vehicle (LDV),
                LDT, or HDG is acceptable.

                ii)  One 1978  or  later oxidation  catalyst equipped  vehicle
                with air  injection.

-------
                          111           TPrl.l.
     iii) AH  vehicles must  be In  good  operating condition with
     all  emission control  systems  functional.   A  1975  FTP type
     test  may  be  performed on  the  vehicle  to  verify functional
     operation of the emission controls.

     iv) Fuel  use shall meet the  most  recent EPA MVEL specifica-
     tions for certification test  fuel.

c) Test Procedure Overview

The  correlation  procedure  consists  of  testing the candidate ana-
lyzer at  several points  on each  range.   The range  scale of  the
candidate  analyzer determines  the approximate  test  points.   The
exact test points are then determined by the  concentration  levels
observed by  the  reference  system.  The exact  test points  are then
replicated several  times   (minimum, of  6)  based  on  the reference
system  response  values.  This  replicate data is ,then analyzed  to
determine correlation  between  the candidate  system and the  refer-
ence system.

d) Test Sequence

     i)  Select a test  vehicle, and warm up  that vehicle with  at
     least  30 minutes  of  hard  load.   (freeway, operation, hard
     accelerations, etc.

     ii) Prepare  the  analysis systems  for measurement  (i.e. warm-
     up, spanning etc.)  operate the reference system according  to
     the provisions in Subpart D where  applicable.

     iii)  Insert  the probe of the  candidate instrument  into  the
     tailpipe  approximately 16  inches.

     iv)  Operate  the  vehicle (or  adjust  the   dilution  box)   to
     obtain stable concentration readings at  approximately 20,  50,
     70  and  90 percent  of full  scale  concentration value on  the
     low range of the candidate analyzer.

     v)  Select the lowest  useable  range on  the Subpart  D  system
     for each  test point  in d)iv)  (see  § 86.338).

     vi)  Sample  for  approximately  1  minute  at  each  test  point.

     vii)  Record  the  average emission  value   of  the candidate
     instrument  and  the  average  chart  deflection from the  refer-
     ence  system over  the  last  10  seconds  for  each  test  point.
     The  two readings  recorded at  each  test point should  be  re-
     corded  over  the  same  time  frame,  and are  defined  as  a
     "paired"  data point.

     viii)  Select  the high  range  of  the  candidate  instrument.

-------
                         112            TP:I.l.
     ix)   Operate  the  vehicle  (or  adjust the  dilution  box)  to
     obtain stable  readings at approximately 20,  50,  70, and 90
     percent  of  full  scale on  the  high  range  of  the candidate
     instrument.   If the  higher  emission values  require impracti-
     cal   vehicle operation,  cease  data generation  and  continue
     with the test procedure.  At least one vehicle should be able
     to achieve the higher values.

     x)  For the  attainable test  points  in' the preceding step,
     repeat step  d)vii).

     xi)   The  chart  deflections recorded in steps d)vii) and d)x)
     for   the  Subpart D  system are now  defined  as "reference set
     points" that will be used for  the  remainder of the  correla-
     tion  test.   When  repeating  the test  sequence  with the same
     vehicle  or  a different vehicle, the  vehicle or dilution box
     should be adjusted to obtain, as close as possible, the exact
     "reference"  chart  deflection.   For  the   test  points  not at-
     tainable in  step d)ix), the chart deflection of the reference
     system becomes  the   set point the first  time  a data pair is
     recorded for that test point.

     xii) Repeat  steps d) iv)  through d) x) at  the set  points de-
     scribed  in  step d)xi).  Record  the emission values from the
     candidate system,  and the chart deflections from  the refer-
     ence system.

     xiii) Ground or short two plug  wires on V8  engines (opposite
     sides  of  intake manifold),  or  one plug  wire for 6  cylinder
     and  4 cylinder engines.

     xiv) Perform steps  d)iv)  through d)x) at the set points de-
     scribed in  step d)xi) a minimum of three times.   Record the
     emission  values  from the  candidate   system,  and  the chart
     deflections  from the  reference system.

     xv)   Select   the  2nd test vehicle,  and  repeat  steps d)iv)
     through  d)xiv)  at  the set  points  described  in  step d)xi).
     Record the emission values from  the candidate system, and the
     chart deflections from the reference system.

     xvi) Repeat  the procedure as necessary to obtain a  minimum of
     6 replicate  responses at each test point.

e) Calculations

     i) For the candidate  system compute the mean  (x) and  standard
     deviation(s)  of  the emission  values for  each  test point.

     ii)   For the reference system convert\each chart deflection to
     a concentration value  from  the analyzer calibration curve.

-------
                         113            TP:I.l.
     ill) For  the  reference system compute  the  mean  (x)  and  stan-
     dard deviation(s)  concentration  values for each test point.

     iv)  Compute  the  normalized  precision difference  (/\ P)  for
     each test point by:

        A  P = ((Ks/ x) candidate) -  ((Ks/ x)  reference)

     where:

     Sample  Size          j(         Sample Size         JC

          5               3.5             10             2.5
          6               3.1             11             2.46
          7               2.9           ,  12             2.40
          8               2.7             13             2.36
          9               2.6             14             2.31

     v) For each range of  the candidate analyzer  perform a  linear
     regression  on all of  the paired ,data  that were measured  on
     that range.   Force the  regression  through zero.  The  refer-
     ence  system  is  the  independent   variable.    Identify  the
     slope(m)  of the regression line.

     vi)  For  each range  of  the  candidate  analyzer compute  the
     ratio(R)   of  the  analyzer  mean  concentrations  for  each test
     point corrected  for  the  slope(m) identified  in  the  preceding
     step by:
               _            —    .••""(•"
          R =  (x reference/x candidate)m

f) Acceptance Criteria

     i) Identify  the  largest  A P value.  If the largest  A p  value
     is less  than  or  equal to the specification for   P,  then  the
     in-use  precision  of  the:  candidate  system  is acceptable.
          (Reference value: A  P  £5%).

     ii)  If the  slope (m)  for each range of  the  candidate analyzer
     is within  the limits  for slope,  then  the  slope  test results
     are acceptable.
          (Reference value: 0.95 £ R  £1.10)

     iii) Identify the minimum and  the  maximum ratio(R) of  slope
     corrected  mean  concentration  values.    If  the  minimum  and
     maximum  ratios are  within the range specified,  then the mean
     concentration ratio test results are acceptable.
          (Reference value: 0.90 £ R  £1.10)

-------
                               114           TP:I.2.
2. FID Analyzer Correlation Test Procedure  (Not required  for  accreditation)

     a)' Equipment required

          i) Candidate instrument.

          ii) An HC analysis system meeting the requirements  of  40CFR86,
          Subpart D for gasoline-fueled engines.

          ±±±)  A  tailpipe  extension  that meets  the  probe  location
          requirements .in 40CFR86 Section 312(c)(v).

          iv) Three test vehicles.

          v) Calibration  gases for each range  used  by both  the  candi-
          date  analyzers  and  the  reference analyzer.   In  this  test
          procedure,  calibration gases will  be  used  instead  of  span
          gases  to span  both  analysis  systems.   The  gases  should  be
          between  60  and  90 percent  of  full  scale on each range used.

          vi) Calibration gases for the Subpart D analysis system shall
          meet  or  exceed  the  requirements  specified   in  Subpart  D.

          vii) Option:  A dilution  system  that allows  the auto  exhaust
          to be  diluted  in a  controlled manner with a suitable  mixing
          chamber,  may  be used  to  obtain  different exhaust  concentra-
          tion level's from the vehicle.

          viii)  Option:   A  chassis  dynamometer  may  be  used  with  or
          without the dilution system to obtain different concentration
          levels.

     b) Test Vehicles

          i) The  type of test vehicle  required for  the FID correlation
          test are  the  same as the type required for  the NDIR correla-
          tion.   Generally it  is  preferred that  the same vehicles  be
          used for both correlations.

     c) Test Procedure Overview

     The  correlation  procedure consists of testing the  candidate  ana-
     lyzer  at  several points  on each  range.   The  range scale  of  the
     candidate  analyzer determines  the approximate  test points.   The
     exact  test  points  are then determined by  the concentration levels
     observed by  the  reference system.  The exact test points  are then
     replicated  several  times (minimum of  6)  based  on  the reference
     system  response  values.  This replicate data is then analyzed  to
     determine correlation  between  the candidate system  and  the refer-
     ence system.

-------
                          115             TP:I.2.
d) Test Sequence

The  test  sequence  is  identical  to CO  correlation test  required
with the following exception.

     i) Stabilized concentration  readings  of  approximately 10,  20,
     35, 50, 70, and  90 percent of  full  scale concentration values
     should  be  substituted  for  the  value  in  step  l.d)iv)  and
     l.d)ix).   Record  the  HC  concentration value  from  the candi-
     date  analyzer as ppmh  or  ppmC6.

e) Calculations

     ±) For  the candidate system  compute the  mean (x)  and standard
     deviation(s)  of  the  emission values  for  each  test  point.

     ii) For the reference  system convert  each chart deflection to
     a  concentration value in ppm C3  (propane)  from  the analyzer
     calibration curve.

     iii)  For  the  reference system compute the mean (x) and stan-
     dard  deviation(s)  concentration  values  for each  test point.

     iv)  Compute  the  normalized  precision  difference   ( A p)  for
     each  test point  by:

        A  P  =  ((Ks/ x)  candidate)  - ((Ks/  x)  reference FID)

     where:

     Sample  Size          1C         Sample Size         JC

           5               3.5             10             2.5
           6               3.1             11             2.46
           7               2.9             12             2.40
           8               2.7             13             2.36
           9               2.6             14             2.31

     v)  For  each range of  the candidate analyzer perofrm a linear
     regression  on all  of  the  paired data  that were  measured on
     that  range.   Force  the  regression through  zero.   The refer-
     ence  system  is  the   independent   variable.    Identify  the
     slope(m)  of the  regression  line.

     vi)   For  each range  of  the  candidate  analyzer compute  the
     ratio(R)  of  the analyzer mean  concentrations for each test
     point corrected  for  the  slope(m)  identified in the preceeding
     step  by:

           R  =  (x reference  FID/x candidate)m

f) Acceptance  Criteria

-------
                    116            TP:I.2.
i) For  HC analyzers  the following  FID comparison should be
available:

     1) Precision
     2) Slope Comparison
     3) Ratio of Modal Averages

-------
                                     117            TP:J.l.-4.
J.  Micro Processor Systems

In general,  the evaluation of microprocessor  systems will consist  of  oper-
ating  each  of  the  automatic  features to  insure  that:  a) each  feature  pro-
vides  equivalent results  as  would be  obtained by  a manual system, and  b)
each  feature has  the  necessary controls  to  perform  the required  actions
conveniently and easily.   Further guidance  follows.

     1. Automatic Zero/Span Check Test Procedure

          a)  The gas  spanning  feature must  be used  throughout  the  entire
          evaluation  procedure  unless  noted  otherwise  (e.g.   pressure  and
          temperature  compensation, Section E.3. b)).

          b)  The automatic span system shall  be  used with  calibration  gas
          (instead  of  span  gas) for the  Calibration  Curve Test Procedure
          (E.I.).

          c) Self-explanatory Test Procedures  for  the other requirements.

     2. Automatic Leak-Check

          a) If  the system is equipped with an  automatic  leak-check feature,
          utilize test  procedure F.5. with  the  following  changes.

                i)  In  step b) x)  of F.5.  gradually open the  needle  valve
               until  the  leak check  fail  light  just comes  on.   Record  the
               observed  concentration value.

                ii)  Then compare the  calculated 3% leak  concentration  (step
               b) ix)  of F.5.) to the concentration  value observed in  a)  i)
                of this  section.

          b) Repeat the  test three times.

          c) Compute  the standard deviation and mean  of the observed concen-
          tration (step  a) i)).

          d)  The mean  minus  one standard  deviation should  be  greater  than
          the calculated 3% leak concentration.

          e) Check  the  interlock requirements.

     3. Automatic Hang-up  Check

          a)  Utilize test procedure  F.6.  to  evaluate  the automatic hang-up
          feature.

          b) Check  the interlock requirements.

     4. Automatic Read  Feature

          i)  The automatic read feature  shall  be  deactivated for all evalu-
          ation  testing except:

-------
                              118            TP:J.5.-9.
          1) The  response  time portion of test procedure F.I.  shall be
          rerun with the automatic read feature operational.

          2) All  system  correlation  tests  (Procedures  in  Section I)
          shall be  run- with  the  automatic read  feature operational.

          3) Other tests self explanatory.

5. Dual Tailpipe

     a)  When  evaluating   the  dual  tailpipe  feature,  the  difference
     between the concentrations to be averaged shall be:

          ±) case 1:    HC  >_200 ppmh
                        co  >_iz

          ii) case 2:   10 ppmh  £HC £ 20 ppmh
                        .1%      1C01 .2%

     b) A single tailpipe at the different concentrations may be  used.

6. Automatic Test Sequence

     a)  Evaluate  the automatic test sequence  for proper .function  with
     both single  and dual  tailpipe  vehicles over  both the pre-81 and
     post-81 test procedures.

     b) Utilize both  the,-same and different cutpoints  for the  two  mode
     tests when evaluating the automatic test sequence  feature.

7. Printer Feature

If the analysis system is equipped with a printer,  the  printer  shall be
checked  for  proper  operation.   The  printer  shall provide the  official
system  results  to be  used in the correlation  procedures (Section I).

8. Vehicle Diagnosis Feature

Check for proper operation.  No other test procedures are required.

9. Anti-Tampering Feature

     i) Visual observation

-------